Renfrewshire Council · 20 November 2025
Back to Finance, Resources and Customer Services Policy Board — 20 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

2 
OFFICIAL 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board 
On:  20 November 2025
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Chief Executive’s Service Improvement Plan 2025/26 Mid-Year
Monitoring Report
___________________________________________________________________
1. Summary 
1.1 The Chief Executive’s Service Improvement Plan 2025-28 was approved by the
Finance, Resources & Customer Services Policy Board in June 2025. The plan
sets out the priorities for the development of the service over a three-year
period.  These priorities are aligned to those set out in the refreshed 2022-27
Council Plan, which was approved by the Leadership Board in June 2024. The
Service Improvement Plan sets out the actions which will ensure continuous
improvement across the service and the performance indicators which ensure
the impact can be measured.   
1.2 This report contains details of the Chief Executive’s Service performance and
achievements over the period 1 April 2025 to 30 September 2025. The main
purpose of the report is to provide: 
• details of the key achievements of the service over the period;
• a progress update on implementing the action plan linked to the 2025-28
Service Improvement Plan;
• an assessment of performance in relation to the service scorecard of core
performance indicators; 
• an overview of priorities for the service over the next six months. 
1.3 Over the past six months, the service has made good progress in delivering
positive outcomes for Renfrewshire and its residents. This is within an operating

Page 2

3 
OFFICIAL
context that remains complex and fast-moving, with local government as a
sector continuing to face significant financial challenges. 
1.4 Key achievements in the last six months: 
• Consulting on the draft Participation Statement for Renfrewshire’s new
Local Development Plan.
• Continuing to deliver the AMIDS South Active Travel Links plan, with a
construction contract being awarded, and works now commenced on site.
• Renfrewshire Local Employability Partnership hosting 46 different events for
Employability Month in Renfrewshire in September, attracting thousands of
people.
• The annual Renfrewshire Employability Partnership Conference, with 180
people attending, and sessions focusing on the response to the Scottish
Government’s No One Left Behind (NOLB) strategy, support to New Scots
and Migrant groups, as well as the skills agenda and Renfrewshire’s future
labour market.
• The Local Employability Partnership approving funding for a net zero
“retrofit” programme to support unemployed people being trained in green
skills development for future job roles.
• Launching another round of the Retail Improvement Scheme, awarding
grants to support shop owners to upgrade their shopfronts.
• Launching a second round of the Historic Buildings in Villages grant scheme
after it was heavily oversubscribed in its first round.
• Work on regenerating town centres progressing in Johnstone, Erskine,
Linwood, Renfrew and Paisley.
• Ongoing delivery of the Fairer Renfrewshire programme including the
launch of the next Winter Connections Programme, winter school clothing
grants, schools and family advice and pension credit campaigns amongst a
range of activities undertaken.
• Delivering the Summer of Fun holiday programme for children, young
people and families in Renfrewshire, with almost 1,973 attendances at the
summer holiday camps alone, and an estimated 2,233 children benefiting
from activities delivered by local community and third sector organisations.
• Completion of the Alcohol and Drugs Change Programme, with the final
report presented to September Leadership Board.
• Launching the first phase of the new council website, Renfrewshire.gov.uk,
in July, with rewrites of content for the most used sections, including bins
and recycling, council tax, housing, benefits and money.
• Completing research fieldwork for a residents’ survey to gather insight on
current public perceptions of local services and council priorities to inform
future decision making.

Page 3

4 
OFFICIAL
• Delivering events including Sma’ Shot Day, Renfrew Pipe Band
Competition, and Gala Days in Renfrew and Barshaw Park. 
2. Recommendations 
2.1 It is recommended that the Finance, Resources & Customer Services Policy
Board notes: 
a) the contents of this report;
b) the progress to date on delivering the actions contained within the Chief
Executive’s Service Improvement Plan;
c) the current performance of the service as measured by the scorecard
indicators;
d) that an outturn report on the full year performance for 2025/26 will be
brought to this Board in June 2026. 
3. Background 
3.1 Service Improvement Plans are a clear statement of the outcomes each service
wants to achieve, the actions it will take to achieve this, and the performance
measures it will use to monitor progress and measure success.  Updates on the
actions and performance measures are included as an appendix to this report. 
3.2 Service Improvement Plans fit within the wider framework provided by the
Council Plan and the Community Plan. They ensure elected members have
oversight of developments within the service and consider and develop policy
options which reflect customer need and resource availability. 
3.3 Section 4 of this report gives details of service activity and achievements over
the period April-September 2025. Section 5 discusses actions amended,
delayed or cancelled, and any new actions added to reflect additional priorities
identified since the plan was approved. Section 6 provides a narrative on
performance, and Section 7 summarises the service priorities for the period until
March 2026. 
3.4 An outturn report detailing full-year performance will be submitted to Board in
June 2026. 
4. Service Achievements April to September 2025 
4.1 The Chief Executive’s Service has a broad remit, from large-scale
infrastructural projects and events to one-to-one support for individuals. This

Page 4

5 
OFFICIAL
diverse remit is reflected in the many achievements of the service over the last
six months, outlined below by theme. 
4.2 Place 
• Phase 1 of the Connected Communities Programme is almost complete,
with an operational service structure and final stages of recruitment
underway. Phase 2 workstreams, focusing on Early Help, Place Based
Approaches and Making Every Contact Count, are now being progressed
by workstream leads, with initial scoping and data gathering in progress to
inform the development of proposals.
• A new round of the Retail Improvement Scheme, awarding grants to support
shop owners in upgrading their shopfronts. This initiative has already seen
hundreds of thousands of pounds invested in commercial properties across
Renfrewshire and, in some cases, has served as a catalyst for new business
investment.
• The popular Historic Buildings in Villages grant scheme launched a second
round, following being heavily oversubscribed in its first round. This scheme
allows owners of privately owned historic buildings (built before 1945) in
Renfrewshire’s villages to apply for funding to plan and carry out repairs,
helping enhance the appearance and vibrancy of these communities.
• The regeneration of town centres is progressing, with a new Vision for
Johnstone developed, a study to identify potential proposals for improving
public spaces and greenspaces complete in Erskine, an initial landscape
framework for enhancements in the Linwood Lade area prepared, in
Renfrew a consultant has been engaged to produce detailed designs for
transforming the former Brown Institute site into a new community space,
and in Paisley the town’s transformation is progressing rapidly following the
implementation of the Action Plan. 
• The Council events programme for 2025 is underway with events delivered
throughout spring and summer delivering meaningful participation and
performance opportunities across a range of artforms, providing
volunteering opportunities and producing a positive economic impact for
Renfrewshire.
• The Council established a £100,000 Local Place Plan Fund to support
communities to shape their local area. Nine organisations have received
funds and are progressing local place plans. 
4.3 Economy 
• Renfrewshire’s Local Employability Partnership hosting 46 different events
for Employability Month in Renfrewshire in September, attracting thousands
of people.
• The annual Renfrewshire Employability Partnership Conference, with 180
people attending, and sessions focusing on the response to the Scottish
Government’s No One Left Behind (NOLB) strategy, support to New Scots

Page 5

6 
OFFICIAL
and Migrant groups, as well as the skills agenda and Renfrewshire’s future
labour market.
• In relation to AMIDS, the joint venture continues to work well, and work on
the Tech Terrace development is progressing, with planning permission
likely to be sought in early 2026. 
4.4 Fair 
• The Fair Food Renfrewshire steering group continues to meet quarterly, with
the September meeting considering a new plan for approval, as well as an
update on the Food Support Forum and the Good Food Nation work.
• The Fairer Renfrewshire programme has recently launched its fourth Winter
Connections programme, with funding supporting local groups to provide
social activities and hot food and drinks for anyone in our community who
would like to come along. The programme helps tackle food poverty and
isolation, and encourages creativity and social cohesion.
• Priorities have been identified and progress is being made with regard to
actions identified through the Community Needs Assessment in Gallowhill,
through engagement with Council Services. Work with health colleagues
and discussions with Scottish Government are informing the approach here
and in other areas, identified through use of data.
• Completion of the Alcohol and Drugs Change Programme, with the final
report presented to September Leadership Board, highlighting the impact
and learning from the Programme for individuals supported, as well as
staff, and as a partnership. The legacy of the Programme will continue
through the work as an Alcohol and Drug partnership, as well as through
the projects and actioned mainstreamed, or adapted within current service
delivery.
• The Chief Executive’s Service continues to lead the Trauma Informed and
Responsive Renfrewshire programme. Over the past six months, the focus
has been on embedding trauma-informed principles into key policies,
including Respect at Work and Equality, Diversity & Inclusion, both were
approved by the September Finance, Resources and Customer Services
Policy Board. A trauma-informed e-learning module has been launched on
iLearn, and two staff members have completed training to deliver trauma-
skilled sessions, with in-person delivery planned for later in 2025.
• The Equalities Outcomes Consultation took place from 1 September to 31
October. The consultation is designed to provide those who work, live and
study in Renfrewshire with an opportunity to feed back on the Council’s draft
equality outcomes and associated actions. Outreach activity has taken place
to promote and enhance the response to the consultation. Third sector
organisations, community groups, and Council services which engage with
individuals who are likely to have an interest in the Equality Outcomes
Consultation have been contacted and offered an individual bespoke
session. Analysis of the responses will take place in November 2025.

Page 6

7 
OFFICIAL
• The new commissioned service to support people in Renfrewshire affected
by head injury underwent a soft launch over the summer of 2025, with a
formal launch in October 2025.   
4.5 Green 
• Continuing to review opportunities within the Council’s infrastructure
pipeline projects to align with the skills transition and green skills
development for local people, including the Local Employability Partnership
approving funding for a net zero “retrofit” programme to support unemployed
people being trained in this area for future job roles.
• Continuing to deliver the AMIDS South Active Travel Links plan, with a
construction contract being awarded, and works now commenced on site.
• Continuing the Climate Change Champions Programme, empowering
young people in Renfrewshire aged 11–18 to take meaningful action on Net
Zero, including Erskine’s established group hosting a climate networking
event in June. 
4.6 Living Our Values 
• The first phase of Renfrewshire.gov.uk was successfully launched in July
2025, with rewrites of content for the most used sections, including bins and
recycling, council tax, housing, benefits and money. Work is now
progressing on the design and procurement of a new intranet, and
developing a content governance model.
• Research fieldwork for a residents’ survey to gather insight on current public
perceptions of local services and council priorities to inform future decision
making has completed, with 1,016 interview-led surveys (telephone and
face to face), 1,029 online survey interviews, and six focus groups. The
survey results will be published and reported to Leadership Board in
December.
• Following the publication of the Controller of Audit’s Best Value Report, the
‘areas of focus’ identified by the Accounts Commission have been added to
the Corporate Improvement Plan. These were detailed in a report to Council
on 26 June 2025. A progress report was taken to the Leadership Board in
September and work continues across all elements of the improvement
agenda, continuing to represent a key focus for Chief Executive’s Service in
the coming year.
• Two service reviews are continuing within Chief Executive’s Service; the first
is the review of data analytics which is aligned to the work of the internal
Data Advisory Group; and the second is the development of a new
Connected Communities function within the Chief Executive’s Service which
brings together staff from the existing Community Learning and
Development and Partnership and Inequalities teams.
• A new Performance group to enhance senior officer scrutiny of council-wide
performance has been implemented, meeting every four weeks, with three

Page 7

8 
OFFICIAL
initial deep dives taken to the group – planning and building standards;
absence; and complaints and enquiries.
• Opportunities for cross-service networking and collaboration continue to be
developed, such as the Performance and Consultation and Engagement
group, as well as thematic groups being established as part of the
Connected Communities model which will further enhance cross-service
networking and collaboration. Marketing and Policy teams have
collaborated on the Resident Research project and will continue to work
together for the next phase of publishing the results and developing long-
term actions, in line with the Engagement and Consultation policy.  
• Work to implement the new Consultation and Engagement Strategy
continues, with a new Senior Policy Officer appointed. A toolkit and checklist
are being developed to support this policy, as well as governance
arrangements for this workstream. An update on consultation and
engagement will be reported to Leadership Board in December as part of
the Council Plan six monthly update. 
4.7   Improving Outcomes for Children and Families 
• A number of colleagues across the Chief Executive’s Service have
completed Promise Keeper training, with officers from Policy and
Partnerships supporting the Promise Keepers Conference in December,
and are members of the ‘Supporting the Workforce Working Group’.
• Funding received from the CORRA Foundation allowed Youth Services to
develop a full summer programme for care experienced young people,
young carers, and their peers, aged 12-17. This year’s programme involved
a range of youth work opportunities including youth clubs, trips, and new
experiences. The programme was co-designed with the Promise Champs
who shaped the schedule, selected the venue for the residential and
identified new experiences available over the six weeks the programme ran. 
The young people also designed the temporary look of their central youth
space transforming it into a vibrant, welcoming environment and safe space
for young people.
• Youthyfest took place on 6 August and was attended by 189 children, young
people, carers, and their friends and family. The youth-led festival was
inspired by Youth Beatz, held yearly in Dumfries, and focused on inclusion,
accessibility, and youth empowerment. The Promise Champs created an
event that was safe, vibrant, and aligned with the core values of The
Promise—ensuring that all young people felt Loved, Safe, and Respected.
The Promise Champs led every stage of the festival’s development from
branding to logistics, to developing skills in project management,
communication, and collaboration.  Young people felt listened to, valued,
and empowered, boosting their self-esteem and sense of purpose. The
festival removed common barriers to participation including cost, travel, and
no one able to support them in attending other events. Feedback on the
event was very positive.

Page 8

9 
OFFICIAL
5. Changes to Actions 
5.1 The action “Launch a new Council website – Renfrewshire.gov.uk – as part of
the digital experience strategy, transforming how citizens interact with the
Council across digital platforms” has been revised to incorporate the work to
design and procure a new intranet. It is now “Deliver the digital experience
strategy to make it very easy for our local communities and employees to find
and use the information they are looking for on Renfrewshire.gov.uk and the
intranet and to help them successfully access online services.” 
5.2 The timescales for the delivery of a number of actions relating to data have
been revised, including: 
• “Developing a corporate data and analytics team model which supports the
aspirations of the Council to be a data driven organisation” – revised
timescale to 31 August 2026 – to allow a newly established technical sub-
group of the Data Advisory Group to progress this activity;
• “Align service data activities with the Digital Strategy objective “Data is a
critical asset” and ensure visibility of data activities at Directorate SMT” –
revised timescale 31 August 2026 – to align with the change of timescale
of the data review noted above;
• “Ensure data owners are aware of responsibilities” - revised timescale to
31 August 2026 - to ensure this is covered in a full cycle of Personal
Development Plans. 
6. Progress against performance measures 
6.1 The Chief Executive’s Service reports on 39 performance indicators of which
10 are reported annually, and 29 are reported quarterly. Appendix 1 contains
full details of these. 
6.2 Of the 29 indicators that are measured on a quarterly basis, using Quarter 2
data, 16 are on track or above target, one is close to hitting the target and nine
have missed the target. Two indicators are data only and have no targets, and
one indicator is currently establishing a new baseline (Number of people
engaging with the Council’s digital channels (not including website). 
6.3 Areas of good performance include: 
• “Percentage of building warrants issued within 10 days of all information
being received”, which is 90.7% against a target of 90%;
• “Number of people being supported to achieve qualifications by Invest
Renfrewshire”, with more than 800 people earning a qualification in the first
half of this year;

Page 9

10 
OFFICIAL
• “Number of people supported into paid employment by Invest Renfrewshire”,
with almost 400 people moving into a new role in the first half of this year;
• “Number of trainee posts in Renfrewshire Council for unemployed people”,
with 50 people joining the Council so far this year;
• “The number of visits by the Environmental Taskforce to flytipping hotspots”;
• Responding to complaints within 5 days (frontline), and 20 days
(investigation), and responding to FOI requests within 20 days”. 
6.4 Two indicators relating to events have not met target for Quarter 2, including
those around numbers of people attending, and economic impact and local
spend of attendees to the visitor events programme. These indicators were
affected by lower than anticipated attendances, in part due to the particularly
wet weather during the Renfrew Pipe Band Competition in July. However, the
Events Programme overall for the year is showing strong performance, with
cumulative figures showing we continue to have excellent engagement with
these activities. 
6.5 Two indicators relating to building standards missed targets, with one showing
a trend of improvement. This service area has experienced recruitment and
retention issues which are common across councils for those fields of expertise,
along with significant capacity and staff absence challenges, and this has
impacted service delivery. Recent recruitment is already contributing to
improvement in timescales. The time to issue a building warrant was 142 days
in Quarter 1, and improved to 113 days by the end of Quarter 2. However, over
the same timeframe, the percentage of first reports issued within 10 days
decreased from 87.1% to 82.4%. Short-term and medium-term measures to
address these challenges are currently in progress, including amending the
structure of the Planning and Building Standards teams, to create additional
posts which, once recruited, will improve timescales. Changes to the structure
will be considered at 4 November 2025 Planning and Climate Change Policy
Board. 
6.6 The time taken to process planning applications has been steadily improving,
although is still below the target of 8 weeks. The average time has decreased
from 10 weeks in Quarter 1, to 9 weeks in Quarter 2. The team are processing
a number of ‘legacy’ applications which have been in the system for a long time,
and this continues to affect the average time this year. It is anticipated that the
continued reduction in legacy cases will result in an increase in performance in
the coming reporting periods. 
6.7 The number of local businesses securing growth support, training, or grants
from Renfrewshire Council Business Team increased significantly from 65 in
Quarter 1, to 153 in Quarter 2. The number of trainee type posts created for

Page 10

11 
OFFICIAL
unemployed people at Renfrewshire Council also increased, from 21 in Quarter
1, to 29 in Quarter 2. 
7. Priorities over the next 6 months 
7.1 In common with all Council Services, the Chief Executive’s Service continues
to contribute to the Council’s overall financial sustainability programme: 
• Providing strategic communications and marketing, data and policy
support to other services, contributing to broad corporate support
alongside colleagues from Finance and Resources.
• Exploring innovative ways of delivering our services, such as
commissioning cultural services and our Connected Communities review.
• Supporting national workstreams, such as work on migration and asylum,
and on trauma-informed approaches. 
7.2 The delivery of the Connected Communities review will be a priority for the
next six months. This programme will bring together work within the Council to
support communities and build on our strong partnerships with the third sector
and communities.   
7.3 Work continues with piloting a new approach to public engagement, including
the delivery of a resident survey to generate insight on current public
perceptions of local services and council priorities to inform future decision
making. It is anticipated that the survey results will be published and reported
to Leadership Board in December. This will be supported by an engagement
and handling plan to ensure the findings of the recent resident survey are
shared in a transparent and accessible way, demonstrating that residents’
voices have been heard and are valued.
7.4 The work to update our town centre strategies continues, including funding
being secured to demolish a former supermarket in Johnstone which will open
up a key site within the town centre. Works are anticipated to commence
winter 2025/26. In Erskine, a study has been completed to identify potential
proposals for improving public spaces and greenspaces, and consultants
were appointed to develop detailed designs for a new civic square in the town
centre. Funding for these designs have now been secured, and officers are
currently in the process of hiring a contractor to deliver the works, also
anticipated to take place over winter 2025/26.  
7.5 Work to boost the local economy will be supported through ongoing
community wealth building activity, further work on making Renfrewshire
attractive to investors, and the continued development of AMIDS.

Page 11

12 
OFFICIAL
7.6 The delivery of Winter Connections will also be a key focus for the Fairer
Renfrewshire programme, as will our cross-service and multi-agency
approach to addressing actions identified through the Community Needs
Assessment in Gallowhill.
7.7 Following the publication of the Controller of Audit’s Best Value Report, the
‘areas of focus’ identified by the Accounts Commission have been added to
the Corporate Improvement Plan. These were detailed in a report to Council
on 26 June 2025. A progress report was taken to the Leadership Board in
September, and work continues across all elements of the improvement
agenda, continuing to represent a key focus for the Chief Executive’s Service
in the coming year, and a progress report will be presented to Leadership
Board in February 2026. 
7.8 Work on an engagement strategy continues, including a toolkit to accompany
the new policy, and governance arrangements to support this workstream. An
update on consultation and engagement will be reported to Leadership Board
in December as part of the Council Plan six monthly update.
7.9 Following the successful launch of the new Renfrewshire.gov.uk., the next
phase involves working on the design and procurement of a new intranet and
developing a content governance model. 
Implications of the Report 
1. Financial – This report notes the financial challenges facing the local authority and
the work that will be undertaken by the service to support the financial sustainability
strategy. 
2. HR & Organisational Development – None 
3. Community/Council Planning – Service Improvement Plans reflect the
contribution of each service to the Council and Community Plans. 
4. Legal – None 
5. Property/Assets – The report notes progress on work relating to council property
and sustainability. 
6. Information Technology – Digital resources are now key to the delivery of
services and strategies are in place to manage this. This report shows how digital
channels are being used to convey information to staff and the public, including
campaigns to advertise events and attract people to the area.

Page 12

13 
OFFICIAL 
7. Equality & Human Rights - The Recommendations contained within this report
have not been assessed in relation to their impact on equalities and human rights
because it is a progress report for noting. Any project reported within this report
should be assessed individually. 
8. Health & Safety – None 
9. Procurement – None 
10. Risk – Risks related to the delivery and management of services are regularly
monitored and included in Renfrewshire Council’s Corporate and Strategic Risk
Registers. 
11. Privacy Impact – None 
12. COSLA Policy Position – None 
13. Climate Change – The report notes progress and future priorities for the Council’s
Plan for Net Zero through its management of council property. 
14.  Children’s Rights – The report notes specific actions targeted at improving
outcomes for children and young people.
___________________________________________________________________ 
List of Background Papers: None
___________________________________________________________________ 
Author Jacqui Jacobsen, Senior Policy Officer,
jacqui.jacobsen@renfrewshire.gov.uk 
Appendix Chief Executive’s Service Improvement Plan 2025 – 28 Mid-Year
Report November 2025

Page 13

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Chief Executive’s Service
Service Improvement Plan 2025 -28
Mid-Year Report
November 2025

Page 14

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Welcome to our six-monthly update
• This update reflects on the first six months of our Service Improvement Plan, highlighting areas where we are
already making progress and some areas we want to focus on more, perhaps because performance isn’t
moving in the direction we anticipated or because of other pressures or factors that makes this even more of a
priority for us.
• Different services will contribute more towards some Council Plan Strategic Outcomes than others, so this
report focuses on areas to which the Chief Executive’s Service contributes more significantly. However, a full
update against all the actions and performance indicators we use to measure progress is included within this
report.
• The Chief Executive’s Service reports on 39 performance indicators of which 10 which are reported annually,
and the remainder reported quarterly. This report contains the data for Quarters 1 and 2, covering 1 April 2025
to 30 September 2025. It also contains some previous trend information for those indicators only collected
annually.

Page 15

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
Local Development Plan
Work has begun on Renfrewshire’s new Local Development
Plan (LDP3), following the statutory process. The Evidence
Report was approved by Council in September 2025 and
will be submitted to Scottish Ministers for Gate Check in
October
Resident Survey
Fieldwork is complete using a hybrid methodology:
• 1,016 interview-led surveys (telephone/face-to-face) –
representative sample across Renfrewshire
• 1,029 online surveys – self-selecting sample
• 6 focus groups – explored perceptions and priorities in
depth
Results will be reported to the Leadership Board in
December, supported by an engagement plan to ensure
findings are shared transparently and demonstrate that
residents’ voices have been heard and valued
Events Programme
The Council’s events programme for 2025 is
underway with events delivered throughout
spring and summer, including
• Sma’ Shot Day
• Renfrew Pipe Band Competition
• Gala Days in Renfrew and Barshaw Park
Upcoming Events include Paisley Halloween
Festival and Christmas Lights Switch Ons in
the five towns

Page 16

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place
Village Heritage Grants and Town Centre Regeneration
• The Historic Buildings in Villages grant scheme has
launched a second round after high demand. It supports
repairs to pre-1945 buildings in Renfrewshire villages,
boosting community appeal
• Town centre regeneration continues with a new Vision for
Johnstone, public space studies completed in Erskine, a
landscape framework for Linwood Lade, design plans
underway for Renfrew’s former Brown Institute site, and
rapid progress in Paisley following its Action Plan
82.4% of first reports are issued
within 20 days (Building Standards)
The average time for processing
planning applications has decreased
from 10 weeks to 9 weeks
Local Place Plan Fund
The Council established a £100,000 Local
Place Plan Fund to support local communities
prepare local places plans for submission to
the Council by 31 March 2026. Nine
organisations have received funds and are
progressing local place plans
Planning and Building Standards

Page 17

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Economy
Empowering People Through Employability
DuringEmployability Month in September Renfrewshire’s Local
Employability Partnership hosted 46 events, attracting thousands
of attendees
180 attendees took part in sessions on Renfrewshire’s response to
No One Left Behind, support for New Scots and migrants, and future
skills needs, particularly in engineering and STEM growth sectors at
the Annual Employability Partnership Conference
Strengthening Renfrewshire’s Investment Proposition
Work on Renfrewshire’s Investment Proposition continues,
with a new webpage created to highlight Renfrewshire’s key
investment location
Additional information on investing in Renfrewshire and
development opportunities has also been added to the Invest
in Renfrewshire website, and a dedicated website has been
launched to promote investment opportunities at AMIDS

Page 18

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Green
31 local businesses in 2024/25
have been working with the Council
to progress the Net Zero agenda
Climate Change Champions Programme
Empowering young people in Renfrewshire aged 11–18 to
take meaningful action on Net Zero
• In Glenburn, P7 volunteers were recruited for the third
year through outreach in local primaries. An S1 group is
working with The Promise to create a mural, due for
completion in October
• Erskine’s established group hosted a climate
networking event in June, and is now focused on
completing Gold Duke of Edinburgh Awards by
December
• New activities launching in October include a
Wednesday climate group (running through March) in
partnership with Active Travel and Global Citizenship
organisations, and a Saturday Eco Volunteers
programme
Net Zero Business Engagement

Page 19

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Winter Connections Round Four Launched
The Fairer Renfrewshire programme launched its
fourth Winter Connections round
Funding supports free social activities and
refreshments to tackle isolation, food poverty, and
boost creativity
Empowering Young Voices:
Summer Support and Youthyfest
Youth Services delivered a CORRA-funded summer
programme for care experienced young people, co-
designed with Promise Champs
Activities included trips, clubs, and a residential.
Youthyfest, attended by 189 people, was youth-led
and focused on inclusion and empowerment
Summer of Fun
1,973 attendances at our CLD summer camps
2,233 children benefited from a wide range of
activities delivered by local community organisations
Alcohol and Drugs Change Programme
The Programme’s final report was presented to the
September Leadership Board, highlighting the
Programme’s impact, supporting over 5,000
people across Renfrewshire, and key learnings for
individuals, staff, and the wider partnership
Its legacy will continue through the ongoing work of
the Alcohol and Drug Partnership, and through
projects that have been mainstreamed or adapted
into current service delivery

Page 20

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair
Ward Census Insights Shared
As part of Members Development Week 2025,
Elected Members received presentations on Ward
Census Profiles, supported by a newly developed
and shared data dashboard
Celebrating Renfrewshire
In 2025, 54 applications were submitted by 48
organisations, offering 120 funding options across
the seven Local Partnership areas
A total of 1,450 young people participated in the
vote, with 1,355 valid votes cast and 3,765
individual choices made.42 groups were
successfully awarded funding
An evaluation of the fund is currently underway,
with a focus group planned for late October/early
November
Equalities Outcomes Consultation Underway
Running from 1 September to 31 October, the
consultation invites those who live, work, or study in
Renfrewshire to share feedback on the Council’s draft
equality outcomes and actions
Targeted outreach has included bespoke sessions
with third sector organisations, community groups,
and Council services to encourage participation.
Responses will be analysed in November 2025 to
inform future planning
Developing ESoL Provision
Work is underway to expand the Council’s English for
Speakers of Other Languages (ESoL) offer — a key
priority in Renfrewshire’s CLD Partnership Plan
Local learner surveys are helping shape a more
flexible and responsive approach in collaboration
with partners

Page 21

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
78,924 people engaging with the Council’s
digital channels (not including website)
Driving Performance and Improvement
The recent Best Value report recognised areas of strong
performance across the Council, highlighting our “robust”
performance management arrangements and ongoing
work to strengthen performance improvement
In response, the Accounts Commission’s focus areas were
incorporated into the Corporate Improvement Plan.
Progress was reported to the Leadership Board in
September, and work continues across the improvement
agenda
87% of frontline complaints and 100%
of investigation complaints dealt with in
the required timescale
Youth Services Recognised for Tackling Gender-
Based Violence
Renfrewshire Council’s Youth Services was shortlisted for
Community Group of the Year at the Scottish Women’s
Awards 2025, in recognition of its impactful work
addressing gender-based violence
Renfrewshire Council Wins UK Council of the Year
Renfrewshire Council was named Overall Council of the
Year for Service Delivery at the UK-wide APSE Awards 2025,
held in September
The Council, alongside partners including OneRen, was
shortlisted in seven out of sixteen categories — the
highest number of nominations for any UK local authority —
reflecting the strength and breadth of service delivery
across Renfrewshire

Page 22

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Actions and indicators
Full list
November 2025

Page 23

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Place
Action Due Status Progress update
Deliver Renfrewshire’s Cultural
Infrastructure Investment Programme 31 Dec 25 Museum work is ongoing (Council managing construction phase and operational readiness and fitout being delivered by OneRen). Other
CI projects now all complete.
Develop and launch Visit Renfrewshire
brand and delivery model to support the
delivery of the Tourism Action Plan
31 Mar 26 The consultation on the brand model is ongoing with colleagues and the Renfrewshire Tourism Network and stakeholders. Work is
continuing with Economy and Regeneration colleagues to secure funding and to develop an implementation plan for the brand.
Design a new Connected Communities
service model for the Council –
implementing a new service structure
and developing the corporate approach
for the whole organisation
31 Dec 26
Phase 1 of the programme, focussed on the Connected Communities service review is now near complete, with an operational service
structure and final stages of recruitment underway. Phase 2 workstreams focussing on Early Help, Place Based Approaches and Making
Every Contact Count are now being progressed by workstream leads, with initial scoping and data gathering in progress to inform the
development of proposals.
Pilot a public engagement approach
including the delivery of a resident survey
to generate insight on current public
perceptions of local services and council
priorities to inform future decision
making
31 Mar 26
The research fieldwork has been completed. The hybrid research methodology included the following:
• 1,016 interview led surveys (telephone and face-to-face). This was a representative sample spread across Renfrewshire
• This was augmented by an online survey 1,029 interviews online. This was a self-selecting sample
• 6 focus groups were also carried out with respondents to explore their perception and satisfaction in more depth and provide further
insight into resident priorities.
The survey results will be published and reported to Leadership Board in December. This will be supported by an engagement and
handling plan to ensure the findings of the recent resident survey are shared in a transparent and accessible way, demonstrating that
residents’ voices have been heard and are valued.
Implement the cultural funding
programmes (COF and CHEF) for
Renfrewshire’s cultural sector
31 Mar 28
The new cultural funding streams of Cultural Organisation Fund and Culture Heritage and Events Fund have been awarded providing
support to organisations over the next three years.  COF is a new multi-year fund to support delivery of cultural activities and also
designed to contribute to organisations revenue costs, making it easier for them to plan and deliver sustained programmes of cultural
activity.

Page 24

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Place
Action Due Status Progress update
Proactively work with property owners to
bring some of the area’s most valued
assets back into use
31 Mar 27
The Council has been proactive in engaging with property owners of prominent buildings across our town centres to explore regeneration
opportunities. This includes the potential redevelopment of the Paisley Centre into a vibrant mixed-use development.
Investment in a number of listed buildings—such as St Matthew’s Church, County Place, 5 George Place, and the Liberal Club—has been
facilitated through detailed discussions with property owners. The goal is to bring these buildings back into productive use.
We have also been engaging with landlords to promote the new Town Centre Premises Grant scheme, launched in 2024, which aims to
reduce the number of commercial vacancies in Renfrewshire’s town centres. E.g. grant funding was approved to help a greengrocer
relocate to a new unit in Paisley town centre.
The Regeneration Team is currently running another round of the successful Retail Improvement Scheme, which supports shop owners in
upgrading their shopfronts. This initiative has already seen hundreds of thousands of pounds invested in commercial properties across
Renfrewshire and, in some cases, has served as a catalyst for new business investment.
In addition, the team have also launched another run of the popular Historic Buildings in Villages grant scheme. This allows owners of
privately owned historic buildings (built before 1945) in Renfrewshire’s villages to apply for funding to plan and carry out repairs, helping
enhance the appearance and vibrancy of these communities. The scheme was heavily oversubscribed in its first round and is currently
accepting applications for funding in a second round.
Officers have also secured £0.5 million in Council motion funding to address a key barrier to progress: challenging market conditions that
inhibit the redevelopment of significant town centre buildings or sites. This funding will support work with property owners to bring
vacant buildings back into use.

Page 25

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Place
Action Due Status Progress update
Progress the actions outlined in our town
centre strategies/visions by collaborating
with partners to transform our key
centres.
31 Mar 28
The Regeneration Team is currently updating our town centre strategies to reflect the changes that have occurred in a post-pandemic
environment. These strategies will align with the guidance and principles outlined in National Planning Framework 4 (NPF4).
A new vision has been developed for Johnstone, focusing on improving the town centre, enhancing public spaces, and supporting local
businesses to foster a more vibrant and sustainable community. Further feasibility work has been commissioned in Johnstone, with a
particular focus on the two civic squares, the reimagining of the Town Hall, and the development of a heritage trail.  An architect has been
commissioned to complete more detailed designs (RIBA stage 4) for the Houston Court and Houstoun Square.  Funding has also been
secured to demolish a former supermarket which will open up a key site within the town centre. Works are hoped to commence winter
25/26.
In Erskine, a study has been completed to identify potential proposals for improving public spaces and greenspaces as part of a wider
review of the town’s Centre Strategy. Short-, medium-, and long-term actions have been identified, and consultants were appointed to
develop detailed designs for a new civic square in the town centre. Funding for these designs have now been secured, and officers are
currently in the process of hiring a contractor to deliver the works.  It is expected that the works will take place over winter 25/26. 
Consultants have prepared an initial landscape framework for enhancements in the Linwood Lade area, located immediately south of the
town centre.  Officers will now be looking to consult local residents further on these initial proposals. 
In Renfrew, a consultant has been engaged to produce detailed designs for transforming the former Brown Institute site into a new
community space. It is hoped that this project will be delivered in 2026.
In Paisley, the town’s transformation is progressing rapidly following the implementation of the Action Plan. Notable achievements
include establishing Paisley as an international culture and heritage destination and stimulating property investment, development, and
reuse. Completed regeneration projects include the refurbishment of the Town Hall and Arts Centre, and the creation of a new Culture
and Learning Hub on the High Street. The restoration of Paisley Museum—another major project—is due for completion next year. A new
wayfinding strategy for Paisley has also been developed to improve the visitor experience in the town centre.
The publication of the Paisley Vision document provides further inspiration for future development in and around the town centre. The
Liberal Club, identified as a key building in the Vision, has recently been renovated, securing its long-term future. Discussions continue
with the owner of the Paisley Centre regarding its potential mixed-use regeneration.
Overall, the Regeneration Team remains committed to advancing regeneration proposals across all of Renfrewshire’s town centres.

Page 26

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Place
Action Due Status Progress update
Deliver the 2025 events programme to
include high quality programming
developing meaningful participation and
performance opportunities for local
groups and artists.
31 Mar 26
The council events programme for 2025 is underway with events delivered throughout spring and summer delivering meaningful
participation and performance opportunities across a range of artforms, providing volunteering opportunities and producing a
positive economic impact for Renfrewshire.
Contribute to the preparation,
monitoring and delivery of
Renfrewshire’s Local Housing Strategy
2023-2028
31 Mar 28
The 2023-2028 Local Housing Strategy was approved in October 2023. The first annual review and progress update was reported to
the Communities and Housing Policy Board on 29th October 2024, advising on progress across the 5 strategic priorities and 42
actions. The second annual review was reported to the October 2025 Communities and Housing Policy Board.
Deliver the Local Development Plan, the
10 year spatial strategy for Renfrewshire 31 Mar 27
Work has commenced on the preparation of a new Local Development Plan for Renfrewshire (LDP3). Preparation of the plan
follows a statutory process. The preparation of the Evidence Report is the first stage of the statutory process, and the Council’s
Evidence Report was approved for submission to the Scottish Ministers at the September 2025 Council meeting and will be
submitted to the Scottish Ministers for Gate Check in October 2025.
The annual update of the Development Plan Scheme and Participation Statement was presented at the 4 November 2025 Planning
and Climate Change Policy Board. This set out a revised timetable for preparation of the Local Development Plan, with adoption
now scheduled for May 2028.

Page 27

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Place
Action Due Status Progress update
Support the delivery of Renfrewshire’s
Strategic Housing Investment
Programme in partnership with other
housing providers in Renfrewshire
31 Mar 28
104 social rented homes were delivered on Strategic Housing Investment Plan sites that were completed in 2024/25 (note: this may
differ from the actual number of affordable housing completions in 2024/25).
The Strategic Housing Investment Plan (SHIP) is updated annually to take account of progress and completions in relation to
delivering the affordable housing programme in Renfrewshire. The Renfrewshire Strategic Housing Investment Plan 2025-2030 was
submitted to the Scottish Government in October 2024. The draft 2026-2031 SHIP was approved for consultation purposes at the
August 2025 Communities and Housing Policy Board and consulted on in August/September 2025. The final 2026-2031 SHIP will be
submitted to the October Communities and Housing Policy Board, and if approved will then be submitted to the Scottish
Government.

Page 28

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Average Time for
processing Planning
Applications
(Householder)
11 8 10 8 9 8
Performance continues to be affected by a backlog of legacy
applications. The average time has decreased from 10 weeks to 9
weeks as efforts continue to reduce the number of legacy cases which
now total 23. It is anticipated that the continued reduction in legacy
cases will result in an increase in performance in the coming
reporting periods.
Affordable housing
completions 104 159 Not measured for quarters
Affordable housing completions figures vary from year to year.  Lower
than target completions in recent years may be  as a result of
increased construction costs that have made the viability of some
schemes more challenging to deliver.  The SHIP identifies a pipeline
of affordable housing developments and opportunity sites for future
years.
Private housing
completions 430 357 Not measured for quarters
Following the publication of Scottish Government Guidance, the
Planning Service is revising the way it records completions on
housing sites in Renfrewshire to better align with Building Standards
completion certificates. The indicative private housing completion
figure for 2024/25 is 430, with this figure still to be subject to final
verification.
Time to issue a building
warrant or amendment to
warrant from receipt of
application (days)
108.0 60.0 142.0 60.0 113.0 60.0
Average time has reduced in Quarter 2; however it should be noted
that team capacity is significantly reduced due to a number of
vacancies and sickness absence. The team is also dealing with a
number of complex and major developments. Short-term and
medium-term measures to address these challenges are currently in
progress, including amending the structure of the Planning and
Building Standards teams, to create additional posts. Changes to
the structure will be considered at 4 November 2025 Planning and
Climate Change Policy Board.

Page 29

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Time to issue a first report
(percentage issued within 20
days)
78.2 95.0 87.1 95.0 82.4 95.0
Average time has reduced slightly in Q2, compared with Q1, albeit
both Q1 and Q2 are higher than Q4 last year.  This increase over
time is reflected in the staffing levels of the team at present.  The
team is currently operating with a number of staff vacancies,
absence due to sickness and the number of complex and major
developments.  It is likely that future reporting will see an
increase in the average time.
Percentage of building warrants
or amendments issued within
10 days of receipt of all
satisfactory information.
87.4 90.0 93.7 90.0 90.7 90.0
Performance is meeting the target although it has reduced
slightly since Q1.  This is due to reduced capacity in the team at
present.
Amount of land brought forward
for re-use and development
contributing to economic
activity and enhancing the built
and natural environment
4.83 20 Not measured for quarters
The 2025 vacant and derelict land survey indicates that 4.83
hectares of land has been brought forward for reuse and
redevelopment in the year April 2024 to March 2025.  The figure
varies considerably from year to year.  Not all of this land is in
council ownership so we have limited levers to influence
development.

Page 30

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Economy
Action Due Status Progress update
Develop an Investment Proposition for
Renfrewshire that is clear on our
economic ambitions for place
31 Mar 26
A new webpage has been created to highlight Renfrewshire’s key investment locations:
(https://www.renfrewshire.gov.uk/article/13818/Renfrewshire-investment-prospectus) 
Additional information on investing in Renfrewshire and development opportunities has also been added to the Invest in Renfrewshire
website: (https://investinrenfrewshire.com/locate-in-renfrewshire/)
In addition, a dedicated website has been launched to promote investment opportunities at AMIDS: https://amids.co.uk/

Page 31

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Economy
Action Due Status Progress update
Maximise funding for regeneration of
Renfrewshire’s places through grant
submissions to external sources including
UK and Scottish Governments
31 Mar 26
The Regeneration and Place Team has successfully secured funding from various external sources. Between 2021/22 and 2025/26, the
team has been allocated £3.9 million from the Place Based Investment Fund for capital regeneration projects. In addition, between
2022/23 and 2023/24, £1.5 million was received from the Shared Prosperity Fund to support both capital and revenue regeneration
activity. A further £0.4 million has been allocated for capital expenditure in 2025/26.
Last year, an application was made to the Scottish Government’s Vacant and Derelict Land Investment Programme (VDLIP), though this
and other applications were paused while a national review of regeneration funding took place.
Following a review, the VDLIP was reopened, and further information was submitted in support of our bid. The Council has since secured
£650,000 from the programme to support regeneration efforts in the Belltrees area of Ferguslie. Contractors are now being secured to
deliver this project during winter 25/26.
The Council has consistently been successful in securing Regeneration Capital Grant Fund (RCGF) support, most recently obtaining
£800,000 for the PACE Theatre project. One application was submitted to the 25/26 scheme, to support town centre regeneration in
Johnstone Town Centre.  This scheme has now been invited to submit a further Stage application in November 2025. 
In Lochwinnoch, applications will be submitted to Historic Environment Scotland’s Heritage and Place Programme and the National
Lottery Heritage Fund’s £250,000–£10 million Heritage Grants programme to support a heritage-led regeneration scheme. The total cost
of the project is estimated at £2.5 million.
Additionally, £297,000 was secured from NatureScot for a peatland restoration project in Clyde Muirshiel Regional Park. Work
commenced in January 2025 and was completed by the end of March 2025.
A further £100,000 has been secured from SEPA to fund RIBA Stage 2 concept design work for the restoration of the Candren Burn in
Ferguslie.
The Council has also applied for funding from VisitScotland’s Rural Tourism Infrastructure Fund to support regeneration projects at
Castle Semple.  This application was successful, with the Council securing £240k from the fund.  Some of this funding will be used to
deliver a new visitor hub facility at Castle Semple, with works commencing in October 2025. 
The Regeneration Team will continue to pursue external funding opportunities to support delivery of our place-shaping agenda.

Page 32

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Economy
Action Due Status Progress update
Complete the Tech Terrace development
and attract the first large occupier. 31 Mar 26 This is a AMIDS JV obligation and again Council is fully participating. Planning is due to be submitted early 2026
Continue to support local employment
through the delivery of targeted support
through the Council’s employability
programme.
31 Mar 27
September is Employability Month in Renfrewshire and the Renfrewshire Employability Partnership hosted 46 different events for people
across the area and attracting thousands of people.
One of the events was the annual Renfrewshire Employability Partnership Conference with 180 people attending. This year's event had
two distinct parts:
• The morning sessions focused on the area’s response to the Scottish Governments No One Left Behind (NOLB) strategy and the work of
the Local Employability Partnership to identify, and respond to, those most in need. This included looking at the support to New Scots
and Migrant groups (a key issue at last year’s event) and the specific needs they have, especially those with no recourse to public funds or
with restricted right to work.
• The afternoon sessions focused on the skills agenda and Renfrewshire’s future labour market with an emphasis on the growth sectors of
engineering and STEM. 
The conference was aimed at current employability and skills practitioners operating within Renfrewshire and  able to contribute to
discussions around current service delivery and improving services and outcomes.
Continue to progress core actions to
support local and regional economic
growth.
31 March
27
The Council continues to focus on securing investment at AMIDS to unlock its full potential for job creation and economic growth. External
funding from Scottish Enterprise and the City Deal has been identified to support the development of Tech Terrace—a speculative project
that will deliver industrial floorspace for advanced manufacturing SMEs and start-ups. Construction is expected to begin next year.
The Council is also working with Glasgow City Region and the Government to secure Investment Zone funding for a new tax zone (£25m),
which would incentivise businesses to locate at AMIDS/Airport. It is hoped that this will serve as a catalyst for significant investment in the
years ahead.  Gateways 3 and 4 for the IZ were recently submitted to Government.  It is expected that the IZ and tax site will go live in
25/26. 
Develop a Community Wealth Building
Plan for Renfrewshire 30 Jun 26
A “Community Wealth Building In Renfrewshire” paper has been produced and approved at board to set out the way forward. The
CWB(Scotland) Bill was published in March 2025 which sets out the way ahead for the public sector. Plans are progressing at pace; local
events have been organised and board is being kept up to date.

Page 33

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Number of unemployed / low
waged people securing
qualifications through
Renfrewshire Council
Employability Programme
(INVEST)
662 400 137 100 138 100 In the last 6 months 275 unemployed/low waged people have achieved an
accredited qualification(s).
Number of new business start
ups in Renfrewshire with
Business Gateway support
265 320 80 80 78 80
The team supported 78 new startups this quarter. Work is ongoing to
encourage those interested in starting their own business to take the final
step.
Measure of civic pride relating
to events 88.8 90 Not measured for quarters
Across the events delivered in 2024 88.8% of Renfrewshire residents agreed
that the events programme made them feel proud of their hometown, the
highest response was 97% and this came from attendees at Sma’ Shot Day.
Number of unemployed/ low
waged people moving into
paid employment through
Renfrewshire Council
Employability Programme
491 350 139 125 150 125 In the last 6 months 289 unemployed/low waged people being supported
through employability services have secured new paid employment.

Page 34

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Number of unemployed/ low
waged people being
supported through
Renfrewshire Council
Employability Programme
(INVEST)
1,420 1,100 361 275 481 275
In the last 6 months 769 participant registered with the service. In
addition, more than 400 continued to receive support into 25/26 and so
around 1,169 people have received support so far this year.
Number of Social Enterprises
supported to grow / develop /
income generate with Council
support
58 80 21 15 11 15 In the last 6 months 32 social enterprises have been supported to grow,
develop or generate income.
Number of local businesses
securing growth support,
training or grants from
Renfrewshire Council Business
Team
382 300 65 75 153 75
Businesses are generally less optimistic than they were this time last year
and are more reluctant to make big investments at this time. However,
uptake this quarter has seen an improvement and figures are on target.
Number of trainee type posts
created for unemployed
people at Renfrewshire
Council
45 60 21 15 29 15 In the last 6 months 50 unemployed people have started in paid positions
within the council.

Page 35

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Number of volunteering
hours supporting the
development and delivery of
the events programme
327 45 126.5 160 31 30
Sma’ Shot day and Renfrew Pipe Band Competition were delivered in
Q2 providing 7 volunteers with opportunities to gain hands-on live
event experience.
In addition to direct volunteering opportunities with the council, there
were multiple indirect volunteering opportunities created as a result of
events.  These include venue assistants throughout many of the 53
participating venues of Doors Open Days, through Renfrew Football
Club at Renfrew Pipe Band Competition and Erskine Arts at Sma’ Shot
Day.
Number of people
participating in the events
programme
3,549 1,314 1,957 700 617 400
Sma’ Shot day and Renfrew Pipe Band competition provided
participation opportunities across a range of activities including music,
choreography, sport, visual art and costume making.
As part of the wider outreach programme of Sma’ Shot Day the team
supported workshops during Castlehead High School of creativity
week these included spoken word, poetry and traditional music.
Number of people
performing in the events
programme
819 300 228 275 266 225
Performance opportunities were available at both Sma’ Shot Day and
Renfrew Pipe Band Competition.  The pipe band offered opportunities
for 120 local performers from bands including Renfrewshire Schools,
Kilbarchan, Paisley and District and Johnstone Pipe Band. Other
opportunities included live stage at Sma’ Shot with musical and
theatrical performances and spoken word through the poetry slam.
Number of people attending
the events programme 108,665 95,000 39,302 40,000 8,707 12,500
Attendance at events in Q2 events were lower than anticipated this is
in part due to particularly wet weather during Renfrew Pipe Band
Competition.

Page 36

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Economic impact and local
spend of attendees to the
visitor events programme
New
indicator 3,978,746 Previously
data only 1,571,682 1,400,000 444,975 600,000
Both Sma Shot day and Renfrew Pipe Band competition returned a
positive economic impact for Renfrewshire with Sma’ Shot achieving
£146,196 and Renfrew Pipe Bands £298,779. Q2 performance for this
indicator was affected in part due to particularly wet weather during
Renfrew Pipe Band Competition.
Number of people
supported, sustained in
work at 6 Months through
Renfrewshire Council
Employability Programme
(INVEST)
288 180 Not measured for quarters
The number of people who were still in employment 6 months after
moving into work and that we have been able to collect data on is 288
people.

Page 37

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Fair
Action Due Status Progress update
Deliver the Fairer Renfrewshire
programme, working with partners to
support Renfrewshire residents through
the cost-of-living crisis
31 Mar 27
A planning session has been held to support development of a Fairer Renfrewshire Plan. The session included members of the Fairer
Renfrewshire Lived Experience Panel.
Advice has continued to be provided through Advice Works and Renfrewshire Citizens Advice Bureau, including specific services for
families. Work has also commenced on the contract for RCAB, as this runs out on 30 June 26.
Winter Connections has opened to community organisations for applications, with 46 received in the first fortnight. Funding will provide
a range of free activities across Renfrewshire.
Planning is in place for the Winter Clothing Payment of £50 per eligible child to be made in October.
Grants funding was approved for Pachedu to pilot a device recycling project, where donated devices will be refurbished and redistributed
to those who need them. This will officially launch as part of DigiKnowvember.
The Fairer Renfrewshire Panel has continued to input to policy and practice withing Council services, most recently taking part in
Employability month and Events planning for Halloween.
Progressing a new workstream that will
focus on advancing equality of
opportunity and ensuring we have a
robust and authentic organisational
approach to implementing our duties
(including UNCRC).
31 Mar 26
The Equalities Outcomes Consultation runs from 1 September to 31 October. The consultation is designed to provide those who work,
live and study in Renfrewshire with an opportunity to feedback on the Council’s draft equality outcomes and associated actions.
Outreach activity has taken place to promote and enhance the response to the consultation. 3rd sector organisations, community groups
and Council services which engage with individuals who are likely to have an interest in the equality outcomes consultation have been
contacted and offered an individual bespoke session. Analysis of the responses will take place in November 2025.

Page 38

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Fair
Action Due Status Progress update
Developing new and potentially radical
approaches to tackling child poverty in
Renfrewshire
31 Mar 27
Priorities have been identified and progress is being made with regard to actions identified through the Community Needs Assessment in
Gallowhill, through engagement with Council Services. 
Work with health colleagues and discussions with Scottish Government are informing the approach here and in other areas identified
through use of data.
Leading on the Council’s migration and
population change response – developing
detailed understanding of the diversity of
Renfrewshire’s communities
31 Mar 25
The census releases over the latter half of 2024 provided a significantly updated picture of Renfrewshire’s communities – significant work
was undertaken to analyse this data.
As part of Members Development Week 2025, a series of Ward Census Profile presentations were delivered to Elected Members and a data
dashboard developed and shared.
A Senior Policy Officer post with a focus on Migration and Population was successfully recruited and is developing strategic needs
assessment in partnership with the Strategic Migration Group, with a workshop taking place in October.
Work with commissioned service to
ensure effective support is provided to
people in Renfrewshire who have been
affected by a head injury
31 Mar 28
A contract for the provision of support for people in Renfrewshire affected by head injury was awarded to Quarriers in February 2025 and
took effect from 1 April 2025. The new service - Brain Injury Community Support - underwent a soft launch over the summer of 2025 and
had a formal launch in October 2025.  Regular discussions have taken place between council officers and Quarriers, and, contract
monitoring arrangements are now in place.  Officers will maintain close links with Quarriers and provide any support required as the
service develops. This action is now complete

Page 39

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Community Asset Transfer -
number of months from
receipt of an application to a
determination being issued
from the Council
3 6 Not measured for quarters
The number of asset transfer requests determined in the period 24/25
was 5 of which 4 were approved and 1 refused. The assets concerned: •
•Calderglen Playing Fields, Lochwinnoch – approved; sale of land to
Calderglen Community SCIO •Public Realm, Kilpatrick Drive, Erskine –
approved; lease of land to Erskine Arts •Site, 49 Beardmore Cottages,
Inchinnan - approved; sale of land to Inchinnan Development Trust
•Renfrew Cricket Field, KGV Renfrew; - refused on the basis that that
that there are obligations imposed on the authority, that prevent,
restrict or otherwise affect its ability to agree to the request •Falcon
Day Centre, Paisley – approved; sale of asset to Pachedu Multi-cultural
Hub
Number of people engaged
with Adult and Family
learning team (snapshot)
1,564 Data
only 616 Data only 579 Data only
AFL have not led on as many partnership events this quarter as we
have been focussing on everyday learning outcomes and family
learning over the summer
Number of people engaged
with Youth Services
(snapshot)
6,054 Data
only 3346 Data only 1,199 Data only
Evolve New Scots – summer programme to combat social isolation
and poverty through cooking, health and art activities. 
Renfrewshire Youth Voice band night in the bungalow, planning for
the Positive About Youth awards, and social days in Edinburgh Fringe.
Renfrewshire Council hosted the Scottish Youth Parliament Sitting
5th -7th September in Paisley Town Hall.
Trinity HS Pupil Council training to undertake the Participatory
Democracy certificate. They are planning to go to the council
chambers to undertake a debate in 2026.
Duke of Edinburgh- Young people, with the support of their DofE
leaders and qualified instructors, navigated appropriate routes for
their Bronze and Silver levels.
Children and young people attended free Summer Holiday camps run
by Street Stuff, taking part in games, sports arts and had input from
the Scottish Fire & Rescue Service and Police Scotland.

Page 40

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Number of children in 
receipt of school clothing 
grants
5316 Not measured for quarters
The number of FSM/CG applications in 2024/25 during the period June to
March fell by approximately 7% compared to the same period in in
2023/24, with the number of children being awarded a Clothing Grant in
2024/25 (June to March) falling by 9% compared to the same period
during 2023/24. Whilst it cannot be definitively determined why there has
been a reduction in the number of children being awarded a Clothing
Grant, it appears that the primary reason for declinature is due to parental
income exceeding the Clothing Grant eligibility thresholds for earned
income within tax credits or Universal Credit. We would suggest that the
reduced amount in applications and awards could be a combination of
four reasons: natural and managed migration from tax credits/legacy
benefits to Universal Credit where earned income thresholds are less
generous, 40% of tax credits only recipients in Renfrewshire choosing not
to move initially onto Universal Credit as part of managed migration
between July 2023 and December 2024 and therefore potentially losing
eligibility to FSM/CGs, higher pay settlements as a consequence of
inflationary pressures increasing wages, and/or parents taking on
additional working hours to help alleviate cost of living pressures.
There is a communications campaign currently being planned to launch
in conjunction with the 2025/26 FSM/CG applications opening early June
2025, highlighting the amount of money that could be saved and
encouraging an increase in take-up.

Page 41

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Number of school visits
undertaken to raise
awareness of environmental
action and the impact of
anti-social behaviours.
155 100 14 15 15 15
Targets vary per quarter. A mix of secondary and primary schools have
been visited, including 11 high school talks and two Primary school
talks. There were two respect days at two high schools

Page 42

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Green
Action Due Status Progress update
Review opportunities within the Council’s
infrastructure pipeline projects to align
with the skills transition and green skills
development for local people
31 Mar 26
Renfrewshire LEP have approved funding for a net zero “retrofit” programme to support unemployed people being trained in this area for
future job roles.
The Economic Development Team work with local contractors to maximise community benefit opportunities in all contracts and are able
to identify where local people can benefit.
Deliver the AMIDS South Active Travel
Links plan. 31 Mar 27 Farrans have been awarded the construction contract and works have now commenced on site.

Page 43

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Green
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Number of local businesses
working with the Council to
progress the Net Zero
agenda
233 40 21 10 10 10
Staffing challenges have impacted capacity; however cover is now in
place. Planned actions to increase engagement and progress the
agenda include:
• Introduction of new Case Studies
• Development of a new messaging campaign - “Know it, Cut it, Win
with it” and “Sustainability Powered Growth”.
• Themed Workshops.
Business networking events to connect businesses interested in
embarking on a sustainability journey with those who are someway
along to connect, share and learn.
Number of local businesses
securing Net Zero growth
grants from Renfrewshire
Council Business Grants
3 8 2 2 0 2
We continue to offer Carbon Baseline Assessments for SMEs. These
assessments provide advice, data and technical information required
for the grant application. Staffing challenges temporarily impacted
capacity. However, cover is now in place to support the role, and we
anticipate a steady improvement from enquiries into formal net zero
grant applications.

Page 44

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Green
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
Number of visits by
Environmental Taskforce to
flytipping hotspots
1,483 1,500 186 375 467 375
Patrols are undertaken to visit hotspot sites to monitor activity and
where possible, secure evidence from on-site camera.   
Although flytipping occurs throughout the year, intelligence gathered
reveals increased activity in the summer months, specifically in
relation to heavier loads of driveway and commercial landscaping type
waste.
Cameras deployed in rural hotspot locations require frequent patrols
to monitor activity and enable a quick response. 
Number of members of the
Team Up to Clean Up
Facebook Community
7,500 5,000 7,900 7,750 8,300 8,000
This years Spotless September saw 322 litterpicks take place,
facilitated by 1,219 volunteers, many of these young volunteers, from
schools and local Scout/Guide groups.
In the last 60 days, the Facebook platform has continued to attract new
members and remain active with 2,215 posts and comments.  The
Friends of Hawkhead group September clean-up reached over 27.5k
people on social media.

Page 45

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Living Our Values
Action Due Status Progress update
Deliver the digital experience strategy to
make it very easy for our local
communities and employees to find and
use the information they are looking for
on Renfrewshire.gov.uk and the intranet
and to help them successfully access
online services.
31 Mar 27
The first phase of Renfrewshire.gov.uk was successfully launched in July 2025 with rewrites of content for the most used sections
including bins and recycling, council tax, housing, benefits and money.
We're now working on the design and procurement of a new intranet and developing a content governance model. This model will help
us keep information structured, accurate and useful across all channels—including Renfrewshire.gov.uk, intranet, MyAccount, Millie and
CSU scripts—for both people and any future AI tools.
Continue to lead Best Value activity, 
including the delivery of the Corporate
Improvement Plan.
31 Mar 27
Following the publication of the Controller of Audit’s Best Value Report, the ‘areas of focus’ identified by the Accounts Commission have
been added to the Corporate Improvement Plan. These were detailed in a report to Council on 26 June 2025.
A progress report was taken to the Leadership Board in September and work continues across all elements of the improvement agenda,
continuing to represent a key focus for the CE’s service in the coming year.
Developing a corporate data and
analytics team model which supports the
aspirations of the Council to be a data
driven organisation
31 Aug
26
Work on the review continues alongside increasing demands for business-as-usual data support for the organisation.
Following the renewal of our contract with our GIS, work is currently ongoing to map out and support a ‘GIS modernisation’ phase of the
review, moving to more cloud-based services, with consultancy support within the contract being allocated to key tasks and
development/skills transfer.
Colleagues in the PMU are supporting the development of a service catalogue. A stakeholder engagement plan has been developed.
A proposal to establish a technical sub-group of the Data Advisory Group has will be taken to the next DAG meeting in November. This
technical subgroup will be a key stakeholder group for this activity.
The timescale for this action has been changed to summer 2026.

Page 46

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Living Our Values
Action Due Status Progress update
Implement a new Performance group to
enhance senior officer scrutiny of council-
wide performance
31 Mar 26
The Performance group is now meeting every four weeks, with three initial deep dives taken to the group – planning and building
standards; absence; and complaints and enquiries.
A range of workstreams now being progressed as a result of these deep dives and are reporting back to the group regularly.
Continuing to develop our service models
which deliver the Council’s priorities and
support its financial sustainability and
transformation
31 Mar 27
The service continues to support the Council’s financial sustainability programme and has delivered required efficiency savings as
reported to Council.
Officers within the service are also leading or supporting significant programmes of transformation including the Connected
Communities programme and the review of services commissioned from One Ren.
Develop opportunities for cross-service
networking and collaboration 31 Mar 26
The work to establish cross-service strategic groups, such as the Performance and Consultation and Engagement groups is directly
supporting this action. Alongside this, thematic groups are being established as part of the Connected Communities model which will
further enhance cross-service networking and collaboration.
Marketing and Policy have collaborated on Resident Research project and will continue to work together for the next phase of publishing
the results and developing long-term actions in line with the Engagement and Consultation policy. 
Deliver service-specific activity to support
employee mental health and wellbeing
and reflect the findings from the Cultural
Assurance Model and employee
engagement survey
31 Mar 26
Within the Policy team, all colleagues have recently completed PDPs which has included a specific discussion about raising any concerns,
in line with the Cultural Assurance Model actions.
Discussions have also taken place at CE SMTs to explore opportunities to support colleague wellbeing and a short-term working group is
being established to progress this.

Page 47

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Living Our Values
Action Due Status Progress update
Implement the new Consultation and
Engagement Strategy 31 Mar 27
The new Senior Policy Officer to lead work on the consultation and engagement strategy has now started with the Council, has been
developing a toolkit to accompany the new policy and checklist and governance to support this workstream is being developed. An
update on consultation and engagement will be reported to Leadership Board in December as part of the Council Plan 6 monthly update.
Colleagues in Marketing and Comms and Policy and Insight have continued to collaborate on the resident survey and subsequent focus
groups, again a report on this will be presented to Leadership Board in December.
Deliver the Internal Communications and
Engagement Strategy 2023-27 to support
enhanced employee communication to
deliver our organisational priorities
31 Mar 27
Work continues on developing a new Managers channel which will launch in the autumn. Our RenTalks MS Teams channel this quarter
attracted a total of 1013 attendees to popular sessions on Strathclyde Pension Fund and Local Government Employee Terms and
Conditions, again with excellent feedback. Regular staff news and recognition stories were published linking to corporate and service
priorities - such as purchase to pay, information classification, sustainability and our new renfrewshire.gov.uk website; survey feedback,
insights and actions; leadership blogs; industry awards; financial wellbeing; learning and development opportunities; and carer and
menopause support.
Deliver the Marketing and
Communications Strategy (2024-27) to
inform all council stakeholders of our
services and our work to make
Renfrewshire a better place to live, work,
learn
31 Mar 27
The focus of the marketing and communications strategy has been the following:
-Promotion of the Food & Drink Festival and start of the summer events programme with integrated marketing and communications
support. A total of 8.5m opportunities to see and hear were delivered through the paid-for marketing events in Q2.
-Promotion and delivery of the fieldwork for the Resident survey
-Brand development workshops delivered with tourism industry and key stakeholders for Visit Renfrewshire
-Promotion of our parks and opens spaces.
-Forward planning for Autumn Winter 2025 campaigns including back to school information for parents around school meal provision
and road safety, Ready for Winter, Dog Fouling, Autumn Winter events programme.

Page 48

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Living Our Values
Action Due Status Progress update
Align service data activities with the
Digital Strategy objective “Data is a
critical asset” and ensure visibility of data
activities at Directorate SMT.
31 Aug 26
This is a key element of the data review and is currently being explored. GIS data is covered in the service’s Business Continuity Planning
in recognition of it being a critical asset for the organisation.
The timescale for this action has been changed to summer 2026 to align with the data review change of timescale.
Identify data skills gaps, e.g. data input,
data analysis and address in alignment
with the People Strategy and aligned to
the CE service’s data review.
31 Mar 26
Work continues as part of the data review to ensure job outlines and person specs are updated to best reflect the key skills required to
deliver an effective data service. The initial focus is on currently vacant posts and the first post is progressing through a job evaluation
process.
To upskill current officers, a data masterclass was delivered as part of this year’s Policy Masterclass Programme in the Policy and
Partnerships division.
Data skills and utilising the suite of existing training was also a key feature of PDPs across Policy and Partnerships.
Ensure data owners are aware of
responsibilities. 31 Mar 26
All colleagues are encouraged to complete the data iLearn course as part of the PDP process. 
As noted above, a data masterclass was delivered as part of this year’s Policy Masterclass Programme in the Policy and Partnerships
division.
The timescale for this action has been changed to 31 March 2026 to ensure this is covered in a full cycle of PDPs.
Review data quality in key line of
business systems and develop
improvement plan in alignment with
organisational priorities.
31 Mar 26 For GIS, as part of our migration to more cloud-based services and reducing our on-premise servers, a significant data cleansing exercise
is being undertaken to ensure only accurate, relevant and necessary data is migrated.

Page 49

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Living Our Values
Action Due Status Progress update
Further define data analysis
requirements to improve decision-
making and support capabilities locally
within services where required, aligned
with the service’s data review.
31 Mar 26 This is also a key element of the data review and currently being explored, including opportunities around existing AI capabilities e.g.
Copilot and within our GIS system and as part of the recent ICS.AI workshops.

Page 50

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target
% of investigation
complaints responded to
within timescales agreed
with customer (Chief
Executive’s)
100% 85% 100% 85% 100% 85% In Q2, the Chief Executive's Service received 1 investigation complaint
which was completed within timescale.
% of frontline resolution
complaints responded to
within timescales agreed
with customer (Chief
Executive’s)
66.3% 85% 91.6% 85% 87% 85%
In Q2, Chief Execs Service received 15 Frontline complaints of which 13
were completed within timescale. Target has been achieved for this
quarter.
Average number of work
days lost through sickness
absence per employee (Chief
Executive's) (FTE)
6.5 6.5 1.06 1.3 2.17 1.2 An increase in this reporting period, impacted by an increase in
psychological, stomach and bowel disorders, and respiratory cases.
% of FOI requests in a
quarter completed within
timescale in the Chief
Executive's Department
95% 100% 100% 100% 93% 85%
During Quarter 2, CEx received 57 single service FOIs of which 53 were
completed within the statutory timescale. 
During the summer, availability of colleagues who can provide input
into requests tends to be impacted and this may have a knock-on
effect to our ability to progress requests within the statutory timescale.

Page 51

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Living Our Values
Indicator Current
Status
Short
term
trend
Long
term
trend
2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Targ
et Value Target Value Target
Number of people engaging
with the Council’s digital
channels (not including
website).
Establishing
new
baseline 76,107 65,000 77,851
Establishing
new
baseline
78,924
Establishing
new
baseline
Followers on all our channels continue to rise consistently. Our council
WhatsApp channel launched in May now has more than 5,000
followers.
Opportunities to see or hear
something (OTSH) positive
about Renfrewshire Council
and Place activity in local,
regional and national media
NEW FOR
2025/26 NEW FOR 2025/26 64,810,224 62,500,000 53,194,695 62,500,000
54% of coverage in Q2 was positive. Highlights include coverage of the
summer events programme, positive inspection results for schools and
nurseries, exam results and city deal investments.
Percentage of new CE staff
completing corporate
induction within 30 days of
start date
NEW FOR 2025/26 NEW FOR 2025/26 Not measured for quarters This is a new annual indicator and data will be available at year end
2025/26.
Percentage of CE staff who
have completed all
mandatory training
NEW FOR 2025/26 NEW FOR 2025/26 Not measured for quarters This is a new annual indicator and data will be available at year end
2025/26.
Percentage of CE staff who
have completed a Personal
Development Plan within the
last year
NEW FOR 2025/26 NEW FOR 2025/26 Not measured for quarters This is a new annual indicator and data will be available at year end
2025/26.

Page 52

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Plan – Improving Outcomes for Children and Families
Action Due Status Progress update
Contribute to the Council’s commitment
to The Promise for all care experienced
people
31 Mar 27
Officers from Policy and Partnerships are supporting the Promise Keepers Conference in December and are members of the ‘Supporting
the Workforce Working Group’.
Funding received from the CORRA Foundation allowed Youth Services to develop a full summer programme for care experienced young
people, young carers and their peers aged 12-17.  This year’s programme involved a range of youth work opportunities including youth
clubs, trips and new experiences.
The programme was co-designed with the Promise Champs who shaped the schedule, selected the venue for the residential and
identified new experiences available over the 6 weeks the programme ran.  The young people also designed the temporary look of their
central youth space transforming it into a vibrant, welcoming environment and safe space for young people. 
Youthyfest took place on the 6th August and was attended by 189 children, young people, carers and their friends and family. The youth
led festival was inspired by Youth Beatz held yearly in Dumfries and focused on inclusion, accessibility and youth empowerment. The
Promise Champs created an event that was safe, vibrant, and aligned with the core values of The Promise—ensuring that all young people
felt Loved, Safe, and Respected. 
The Promise Champs led every stage of the festival’s development from branding to logistics to developing skills in project management,
communication, and collaboration.  Young people felt listened to, valued, and empowered, boosting their self-esteem and sense of
purpose.  The festival removed common barriers to participation including cost, travel and no one able to support them in attending
other events. Feedback on the event was very positive.

Page 53

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Chief Executive’s Service
Service Improvement Plan 2025 - 28
Mid-Year Report
November 2025