Finance & Resources Service Improvement Plan 2025-26 Mid-Year Monitoring Report

Renfrewshire Council · 20 November 2025
Back to Finance, Resources and Customer Services Policy Board — 20 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
OFFICIAL 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board 
On:  20 November 2025
___________________________________________________________________ 
Report by: Director of Finance & Resources
___________________________________________________________________ 
Heading: Finance & Resources Service Improvement Plan 2025/26 Mid-Year
Monitoring Report
___________________________________________________________________ 
1. Summary 
1.1 The Finance & Resources Service Improvement Plan 2025-28 was approved by the
Finance, Resources & Customer Services Policy Board in June 2025.  The plan
sets out the priorities for the development of the service over a three-year period. 
The Service Improvement Plan sets out the actions which will ensure continuous
improvement across the service and the performance indicators which ensure the
impact can be measured.  These priorities are aligned to those set out in the
refreshed 2022-27 Council Plan, which was approved by Leadership Board in June
2024.   
1.2 This report contains details of Finance & Resources performance and achievements
over the period 1 April 2025 to 30 September 2025.  The main purpose of the report
is to provide: 
• details of the key achievements of the service over the period;
• a progress update on implementing the action plan linked to the 2025-28
Service Improvement Plan;
• an assessment of performance in relation to the service scorecard of core
performance indicators; and
• an overview of priorities for the service over the next six months.

Page 2

2 
OFFICIAL
1.3 Over the past six months, the service has made good progress in delivering positive
outcomes for Renfrewshire and its residents.  This is within an operating context
that remains complex and fast-moving, with local government as a sector continuing
to face significant financial challenges. 
1.4 More detail of achievements is given in Section 5 but the list below notes some
highlights: 
• Leading on the Council’s Financial Sustainability programme;
• Delivery of the annual accounts;
• Introducing revised Equality, Diversity and Inclusion and Respect at Work
policies as part of our ongoing review of all HR policies;
• Preparing for the implementation of new parliamentary boundaries in 2026 and
beginning preparations for the delivery of a Scottish Parliamentary election in
May 2026;
• Supporting the delivery of the Council’s infrastructure investment programme
through provision of a range of operational and strategic services; 
• Continuing our work with economic development colleagues to support and
encourage local businesses to bid for public sector contracts, with our latest
Meet the Buyer event taking place in October 2025;
• Ongoing work to support residents with the cost-of-living through the
administration of grant support, signposting to benefits and related entitlements,
and through the work of Advice Works;
• Continuing to provide a range of strategic and operational support to other
Council services to support the delivery of financial sustainability programmes,
the Plan for Net Zero, large scale infrastructure projects and strong universal
services;
• Delivering the new Purchase to Pay programme, which is scheduled to go live
at the end of November 2025;
• Implementing our Digital Strategy, including the delivery of workstreams to
explore the potential AI to support both back-office functions and service
delivery. 
2. Recommendations 
2.1 It is recommended that the Finance, Resources & Customer Services Policy Board
notes: 
a) the contents of this report;
b) the progress to date on delivering the actions contained within the Finance &
Resources Service Improvement Plan;

Page 3

3 
OFFICIAL
c) the current performance of the service as measured by the scorecard indicators;
d) that an outturn report on the full year performance for 2025/26 will be brought to
this Board in June 2026. 
3.  Background 
3.1 Our Service Improvement Plans are a clear statement of the outcomes each service
wants to achieve, the actions it will take to achieve this, and the performance
measures it will use to monitor progress and measure success.  Updates on the
actions and performance measures are included as an appendix to this report. 
3.2 Service Improvement Plans fit within the wider framework provided by the Council
Plan and the Community Plan.  They allow elected members to have oversight of
developments within the service and to consider and develop policy options which
reflect customer need and resource availability. 
3.3 Section 4 of this report gives details of service activity and achievements over the
period April-September 2025. Section 5 discusses actions delayed or cancelled and
any new actions added to reflect additional priorities identified since the plan was
approved.  Section 6 provides a narrative on performance and Section 7
summarises the service priorities for the period until March 2026. 
3.4 An outturn report detailing full-year performance will be brought before this board in
June 2026. 
4. Service Achievements April-September 2025 
Place 
4.1 The Finance and Resources service continues to provide support to programmes
across the range of council activity, as well as lead on the work to ensure we
continue to be financially sustainable in a challenging economic environment.  The
service also delivers universal services on behalf of the council, and specific
activities are outlined throughout the report. 
4.2 Our Legal and Democratic Services team have been preparing for the
implementation of new electoral boundaries for the Scottish Parliament, which will
take effect for the elections in May 2026.  Implementation should be complete by
the end of 2025.

Page 4

4 
OFFICIAL
Economy 
4.3 Procurement continue to work closely with Economic Development on supporting
local businesses to bid for public sector contracts.  The team took part in a
Renfrewshire Chamber of Commerce networking event in June, attended a national
Meet the Buyer event  also in June, and, with partners, hosted another Renfrewshire
Meet the Buyer event in October.  The teams have also collaborating on providing
sector-specific webinars aligning with contract framework renewals.  
Fair 
4.4 Progress has been made by the Digital team to streamline the process of the Digi
Zone roll out.  An onboarding pathway and on board toolkit is being finalised to
ensure a smooth process when organisations join the programme. This includes
creation of FAQ template for future Digi Zone organisations, an online application
pathway, application evaluation process and hosting of Digi Zone assets. 
4.5 In response to feedback from the Employee Engagement Survey and actions
identified through the Cultural Assurance Model, the Council has developed a new
Employee Suggestion Scheme to encourage innovation, engagement, and
continuous improvement. The survey also highlighted opportunities to strengthen
awareness of the Council Plan and decision-making processes, and to further
enhance wellbeing support. This includes Safer Gambling awareness delivered in
partnership with RCA Trust, with additional training for Mental Health First Aiders
via an iLearn module to ensure informed support.  A Council- wide action plan and
service-specific plans have been developed, supported by employee engagement
forums, with actions progressing in line with agreed timelines. Members will
receive the first annual progress report on these actions in February 2026. 
Green 
4.6 The service does not currently have specific actions aligned to the Green theme but
continues to support delivery of this Council priority through strategic and
operational support for Net Zero, including ensuring climate considerations are a
key element in our procurement processes. 
Living Our Values 
4.7 The People and OD team are continuing their review of HR policies. Most recently,
they have presented a revised Equality, Diversity and Inclusion policy and a revised
Respect at Work for approval; these were both approved by the Finance, Resources
and Customer Service Policy Board in September 2025.

Page 5

5 
OFFICIAL
Employee wellbeing continues to be a priority and the team are supporting the
delivery of RenTalks as well as providing forums on particular topics such as our
Monthly Menopause Forum and our newly-established Care-Experienced Staff
Network. 
4.8 The service is committed to the work of The Promise and more staff are training as
Promise Keepers.  Our People and OD team are strengthening our recruitment
practice in regard to care-experienced people, and the Council will now guarantee
interviews to care-experienced applicants who meet the essential criteria for a role. 
4.9 The new Purchase to Pay programme is designed to streamline payments and
deliver a more efficient process and significant reduction in the level of manual
processing required. Phase 1 is due to go live on 24 November 2025 as User
Acceptance testing for Requisition and Approver tasks was completed 15 August
2025 and Invoicing UAT concluded 26 September 2025. Preparation for Go Live and
the launch of the new system is underway. This includes the launch of training for
Approvers and Requisitioners across the council as well as data preparation and
loading. Regular communications are being provided to senior management,
requisitioners, suppliers and the wider staff group. 
4.10 We are continuing to implement our Customer Strategy and deliver improvements
which make it easier for customers to contact the Council.  Additional services are
being made available online and new services continue to be developed using the
Scottish approach to service design, and work is underway to create training to
enhance the customer service skills of our staff.  Our Digital Customer Adviser Millie
is typically able to provide a response to around one-third on enquiries without the
customer having to be passed to a service team. 
4.11 The Digital Strategy was approved in April 2025 and is a prioritised programme of
work following six key delivery themes. This is being monitored by the Digital Board
where issues, risks and barriers will be managed and resolved to ensure timeous
delivery of key initiatives such as development of artificial intelligence (AI). 
4.12 Data management, development and skills continues to be a key focus for our
services. The Data Advisory Group has identified the need for training across a
variety of different services. General technical and data input skills in ICT are being
reviewed whilst in People and OD a skills audit has been cascaded to staff to identify
specific skill gaps. In Finance services the understanding of Power BI is being
reviewed and some further investigation is taking place in Business services and
Legal and Democratic Services. Following this process appropriate training has been
identified to bridge any knowledge gaps and upskill staff. As part of this programme
a specific Data Analysis and Management training has been developed to be
available to services through the Data Advisory Group.

Page 6

6 
OFFICIAL 
4.13 Following a review of the leadership development programmes delivered in
partnership with SOLACE and our in-house CMI-accredited pathways, feedback
from participants has informed the next stage of our leadership development
journey. A new programme is now being designed to support leaders at every level,
from frontline supervisors to the Chief Executive. This refreshed approach will be
needs-based, practical, and flexible, supported by a suite of resources and self-
directed learning tools that allow participants to learn at their own pace while
focusing on strategic priorities. The proposed model will be presented to the
Corporate Management Team in the coming weeks, with a view to piloting and
rolling out the programme in early 2026. 
4.14 We have continued to achieve success through recent accreditations, awards and
nominations. Members will recall we were awarded the highest accreditation by
Carer Positive as an ‘exemplary employer’ recognising enhanced paid leave
provisions and offering bespoke support provision, using the ‘Carer Passport’ tool
and the Carers Connected Forum.  We achieved recognition as finalists for the
Carers UK awards held on 16th October 2025 in the Transformational Employer
category. This award recognises a Transformational Employer who is an
ambassador for carers internally and embeds the lived experience of carers in
everything that they do. We are proud to be an accredited Breastfeeding Friendly
Scotland Employer. To create an inclusive and supportive environment, we
launched a dedicated Breastfeeding Friendly Scotland course on our iLearn
platform. In collaboration with our NHS Scotland partners, we developed new
training and guidance to help managers and colleagues provide the best possible
support for women who are breastfeeding.  To provide ongoing peer support, we
established the Supporting Menopause Forum, similar to the network available for
working carers.  Our forum, ‘Let’s Pause’, launched in April 2025, offers monthly
virtual sessions where colleagues can connect and share experiences in a
supportive, relaxed, and friendly setting. 
4.15 The Council also achieved national recognition at the APSE Service Awards in
September 2025, winning the prestigious ‘Council of the Year in Service Delivery’
award; while the Council’s procurement team secured the Procurement
Transformation Initiative Award at the GO Awards Scotland for their work on the
housing sensors project.   
5 Areas where actions have been delayed or cancelled 
5.1 Due dates have been amended for four actions under Living our Values; these all
relate to data.  The work done to date on these actions has identified further issues
to be explored and due dates have been flexed to accommodate the additional work,
as follows:

Page 7

7 
OFFICIAL 
• Align service data activities with Digital Strategy objective: Data is a critical asset
and ensure visibility of data activities at Directorate SMT – due date has changed
from 31 August 2025 to 30 November 2025;
• Identify data skills gaps , e.g. data input, data analysis and address in alignment
with the People Strategy – due date changed from 31 October 2025 to 30 November
2025
• Ensure data owners are aware of responsibilities, and align with Data Catalogue –
due date changed from 31 October 2025 to 31 December 2025
• Further define data analysis requirements to improve decision-making and build
capabilities locally within services where required – due date changed from 31
August 2025 to 30 November 2025. 
6. Progress against performance measures 
6.1 Finance & Resources have 29 performance indicators in its current scorecard.  Of
these, 19 are reported quarterly and 10 are reported annually. The attached
scorecard contains data for either the last three years or the last four quarters (up
to Quarter 2 of 2025/26) as appropriate. Commentary on recent performance is also
provided. 
6.2 Of the 29 indicators, 2 are data only and have no target, 13 are meeting or
exceeding their target, 5 are narrowly missing target, and 6 are more than 10% off
target. 
6.3 Performance continues to be strong in relation to the processing of housing benefit
applications and change of circumstance applications, both of which are exceeding
their target.  New applications currently take just over 17 days to complete, against
a target of 28 days, and change of circumstances take an average of 4 days to
complete, against a target of 10 days. 
6.4 Performance also remains good in relation to processing Crisis Grants and
Community Care Grants, both of which provide vital support to residents in need. 
Crisis Grant applications are consistently processed within two days, with the
majority dealt with in one day.  Our target for processing Community Care Grants
is 15 days but the team are currently averaging only 8 days per application. 
6.5 The service is meeting its targets for responding to complaints and Freedom of
Information requests.  In the first half of the year, the service received just over 400
frontline complaints, just over 100 investigation complaints, and over 200 FOI
requests.

Page 8

8 
OFFICIAL
6.6 The percentage of non-domestic rates income collected in the year to date is slightly
higher than the target set whilst the percentage of council tax income collected is
slightly lower.  The service continues to work hard to maximise income recovery
using all available approaches. 
6.7 Absence rates for the service are higher than the target for Q2 – 2.51 days lost per
FTE against a target of 1.9.  There was a particular increase in Musculo-skeletal
related absence in Q2. 
6.8 This year all services started reporting on completion rates for the corporate
induction, mandatory training, and Personal Development Plans, and the Finance
and Resources Service Improvement Plan also includes indicators tracking these
at the council-wide level.  The completion of Personal Development Plans is an
annual indicator and so data will not be reported until the outturn report in June
2026.  There is considerable variation across services.  The figure for corporate
induction does not currently capture face-to-face inductions, only the mandatory
elements from iLearn rather than other activity such as Toolbox Talks.  Work is
underway to ensure this can be captured on Business World and this should
improve completions within the 30 day target.  In Finance and Resources 95% of
staff have completed all mandatory iLearn courses and managers receive
automated notifications of expired or incomplete courses within their team. The
overall Council completion rate is impacted by lower rates in larger services, and
work is ongoing within services to address the issue. 
7. Priorities over the next six months 
7.1 The Council’s programme of financial sustainability work and transformation will
continue to be a priority for all services in the next six months and beyond.  The
preparation of the 2026/27 budget will be informed by the Scottish Government’s
draft budget scheduled for 13 January 2026.  This involves professional advice and
support from FAR service teams including Finance, the Programme Management
Unit and People and Organisational Development. 
7.2  The roll-out of P2P will be a priority for the remainder of the year, with go-live
scheduled for the end of November. 
7.3 The full implementation of the boundary review will be a priority for Q3 and
thereafter the service will be working on the delivery of Scottish Parliamentary
elections in 2026.

Page 9

9 
OFFICIAL 
7.4 Cyber-security remains a major concern for all local authorities, and the risk of a
successful attack remains high.  The Council will continue to strengthen its
approach to cyber security, having recently undertaken recruitment to provide
additional expertise in this area.   
Implications of the Report 
1. Financial – This report notes the financial challenges facing the local authority and the
work that will be undertaken by the service to manage this. 
2. HR & Organisational Development – The action plan details several new and
updated pieces of work being progressed by the People & OD team. 
3. Community/Council Planning – Service Improvement Plans reflect the contribution
of each service to the Council and Community Plans. 
4. Legal – As detailed in the report. 
5. Property/Assets – None 
6. Information Technology – Digital resources are now key to the delivery of services
and strategies are in place to manage this. 
7. Equality & Human Rights – This report has not been assessed because it is for noting
.  Any actions arising from the report will be assessed and the impact assessments
made available. 
8. Health & Safety – The report provides an update on some of the work of the People
and OD team to support employee health and wellbeing. 
9. Procurement – The report details some of the priority actions being progressed by the
procurement team. 
10. Risk – Risks related to the delivery and management of services are regularly
monitored and included in Renfrewshire Council’s Corporate and Strategic Risk
Registers. 
11. Privacy Impact – None 
12. COSLA Policy Position – None

Page 10

10 
OFFICIAL 
13. Children’s Rights – this report is for noting and has no direct implications on
children’s rights.   
14. Climate Change – The service will contribute to the Council’s Plan for Net Zero through
initiatives such as the Green Print Strategy and sustainable procurement practices as
well as through the provision of strategic and business support for other council
services.
___________________________________________________________________ 
List of Background Papers: None
___________________________________________________________________

Page 11

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Finance and Resources
Service Improvement Plan 2025 -26
Six-monthly progress update
November 2025

Page 12

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Welcome to our six-monthly update
• This update reflects on the first six months of our Service Improvement Plan, highlighting areas
where we are already making progress and some areas we want to focus on more, perhaps because
performance isn’t moving in the direction we anticipated or because of other pressures or factors
that makes this even more of a priority for us.
• The following pages shine a spotlight on some great projects or practice, andhighlight areas where
we’d like to improve or develop further.  At a service level, there is a stronger focus on some of the
Council Plan Strategic Outcomes than other. Towards the end of this document, you’ll find a full
update against all the actions and performance indicators we use to measure progress.
• We report on 29 performance indicators, 10 which are reported annually and 19 which are reported
quarterly.

Page 13

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place and Economy
Procurement continue to work closely with
colleagues in Economic Development to
support local businesses who are interested
in bidding for Council contracts.  They have
delivered a number of events and webinars
for potential suppliers including another of
our Meet the Buyer sessions in October
2025.  Since 2023, our Contract Standing
Orders have included guidance that,
wherever possible, 75% of suppliers invited
for Quick Quotes should be Renfrewshire-
based.
Officers are preparing for the
implementation of new electoral
boundaries following the Scottish
Parliamentary boundary review. 
Preparations are also underway for
the delivery of Scottish Parliamentary
elections next May.

Page 14

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair and Green
New housing benefit applications
processed in average 17.2 days
and changes in 4.03 days
Community Care Grants
processed in 8 days against
target of 15 days
We have 22 Digizones operating across
Renfrewshire, including a mobile service from the
Skoobmobile.  Our Digizones offer up to four
kinds of support:  digital skills support, internet
access, digital devices, and signposting to where
you can get online.
To help us build on the success of this approach,
which has been recognised as national good
practice, we are creating toolkits to help more
organisations apply and get set up.

Page 15

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our values
90% of frontline complaints
received answered within
five days
Average of 4.44 days to pay
invoices to small and medium
size businesses
Average of 2.06 days
lost per employee due
to sickness absence
The Council’s Purchase to Pay (P2P) programme
aims to modernise the way we purchase goods
and services and create greater efficiency by
automating many manual processes.  The P2P
team are currently supporting officers across the
Council with training and testing ahead of the
system going live in November 2025.
As part of our commitment to The Promise, we
will now guarantee an interview for care-
experienced job applicants who meet the
essential criteria for our posts.  We’ve also
established our Care-Experienced Staff
Network and are working to grow membership
of the group.

Page 16

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Actions and indicators
Full list
November 2025

Page 17

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Place
What we will do Due Date Status Progress update
Support delivery of the Council’s
infrastructure investment programme 31 March 2026 Paisley Town Hall, Paisley Learning & Cultural Hub and Paisley Arts Centre are all complete and operational. Paisley Museum is expected
to move from Practical Completion of the building during 2025 to an intense exhibition fit out and operational readiness process.
Support delivery of the Council’s financial
sustainability work 31 March  2027 The aim of this target is that the Council is able to maintain a balanced budget by 31 March 2027 within the context of a challenging
financial environment. This has so far been achieved for 2025/26, the first of the five financial years in scope.
Delivering strong universal services to all
Renfrewshire citizens 31 March  2027
The Service continues to deliver services in relation to the Scottish Welfare Fund (SWF). Processing of SWF remains within target. It also
continues the process of awarding Discretionary Housing Payments to customers to mitigate the bedroom tax as well processing DHPs for
Financial Hardship and customers affected by the Benefit Cap.
Implementing the Scottish Parliamentary
boundary review 31 March 2026
Boundaries Scotland submitted their report with their final recommendations to the Scottish Parliament Ministers on 30 April. The
Scottish Parliament have approved the revised boundaries set out in that report. The final step in the process is approval by the Privy
Council which is due in October 2025. It is anticipated that Electoral Registration colleagues across Scotland (including the ERO at the
Renfrewshire Valuation Joint Board) will publish revised electoral registers on the new boundaries on 1 December 2025. A report was
approved at full Council on 25 September 2025 agreeing a revised Polling Plan based on the revised boundaries. Once the December
register is published officers will import the details to the Council’s election management system which will complete the implementation
process.”

Page 18

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Economy
What we will do Due Date Status Progress update
Actively engage with Renfrewshire
suppliers to increase the percentage of
procurement spend
31 March 2026
The next Renfrewshire Anchor Meet the Buyer event will take place on 30th October 2025. This event is in collaboration with NHS Greater
Glasgow and Clyde and the University of the West of Scotland. Engagement with previous attendees and local Renfrewshire businesses
took place during this quarter to shape the event ensuring it meets the needs and interests of local companies. These events aim to
support local businesses in accessing public sector contract opportunities and to strengthen the local supply chain.
The Procurement Team, supported by the Supplier Development Programme (SDP), hosted two ‘Talking Tender’ webinars to support the
renewal of the Early Learning & Childcare Flexible Framework. The first session was held on the afternoon of 17 September 2025, with 32
SMEs registered to attend, the second event took place that evening with 14 SMEs registered to attend. These efforts are part of ongoing
work to engage local suppliers during the early stages of new framework and contract development. Supplier engagement was also
undertaken with the newly appointed AMIDS South contractor to discuss their commitment to creating opportunities within the local
business supply chain.
During this quarter, the Corporate Procurement Team issued 9 PINs for upcoming procurements. This initiative aims to boost the number
of local suppliers bidding for Council contracts. In line with Contract Standing Orders (CSOs), a minimum of 75% of suppliers invited to CPU
Quick Quotes must be based in Renfrewshire, where possible. Similarly, new guidance for purchases under £25,000 recommends that at
least 75% of invited suppliers (to the three quote process) be local to Renfrewshire.

Page 19

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Fair
What we will do Due Date Status Progress update
Use learning from early implementer phase
of DigiZones to expand coverage across
Renfrewshire supporting our citizens and
communities to get online.
31 March 2026
Onboarding pathway / toolkit being finalised, which includes creation of FAQ template for future DigiZone orgs, online application
pathway, application evaluation process and hosting DigiZone assets.
Particular focus over coming months on gathering Qualitative insights to support quantitative data.
Digital Lifelines funding application not being progressed at this time however there may be potential of future funding becoming
available and opportunity to re-apply.
Criteria for future DigiZones being considered.

Page 20

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
What we will do Due Date Status Progress update
Deliver a refreshed approach to workforce
planning and workforce innovation. 30 June 2026
The Workforce Planning Group continues to advance the priorities set out in the People Strategy, implementing recommendations from
the Best Value audit. The group is working closely with the Head of People & OD to shape strategic approaches to workforce planning and
organisational development, identifying new priority areas for the next five years.
A biannual People Metrics report was presented to the FARS Board on 13 February 2025 for noting and monitoring. A subsequent report
on 12 June 2025 introduced a broader and more comprehensive set of People Metrics for the same purpose. The next biannual report will
be submitted to the Board on 20 November 2025.
Work is underway to develop the new People Strategy for (2027–2032), which will be shaped around four strategic outcomes that support
long-term financial sustainability:
• Healthy and Performing
• Enabled and Engaged
• Empowered and Sustainable
• Adaptable and Resilient
Engagement with Directors, Heads of Service, and service leaders will begin in early 2026 to review the draft strategy, agree key priorities,
and provide feedback on implementation themes. This work will be fully aligned with the vision and strategic priorities of the new Council
Plan, scheduled for implementation in 2027.
A progress update on the current People Strategy will be presented to Members of the FARS Board on 20 November 2025.
Deliver the Purchase to Pay programme
which will streamline payments and deliver
a more efficient process
31 December
2025
Launch of P2P Phase 1 and the Business World ERP. The go-live of P2P Phase 1 has been confirmed as 24 November 2025. User
Acceptance Testing (UAT) for Requisition and Approver tasks was completed 15 Aug and Invoicing UAT concluded 26 Sept.
Deliver the Internal Audit Plan for 2025/26. 31 March 2026 Progress for Qtr 2 was reported as 38.2% against a target of 41%; this is due to temporary reduced capacity in the team.

Page 21

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
What we will do Due Date Status Progress update
Implement the new Customer Strategy.
31 March 2029 Improvements are ongoing to how customers contact the council, with the new Website in place, additional services available online and
Millie continuing to provide telephone support for calls to the contact centre. New services continue to be developed using the Scottish
approach to service design and work is under way to create training that will increase the customer service skills of our staff. Ongoing work
continues to support our communities to develop their digital skills.
Implement the new Digital Strategy. 30 April 2030 A programme of work has now been created and is monitored by the Digital Board which meets on a regular basis. There are opportunities
for new initiatives (e.g. AI) to add to this programme of work.
Align service data activities with Digital
Strategy objective: Data is a critical asset
and ensure visibility of data activities at
Directorate SMT.
30 November
2025 Further discussion with FARS SMT and FARS DAG reps has concluded to investigate potential dashboards for:
• Debt recovery
• Customer Services: Performance
• Absence Stats
Some further potential opportunities still being investigated – due date has been amended to November 2025.
Next steps will be separate action to develop solutions.
Identify data skills gaps , e.g. data input,
data analysis and address in alignment with
the People Strategy.
30 November
2025 Various gaps noted by DAG reps across FARS:
• Technical and data input skills in ICT - being addressed.
• People/OD - skills audit being cascaded to staff, and other skills gaps identified and addressed through restructure.
• Finance - Power BI skills gaps to address standard processes being reviewed, file naming conventions, annual gen ledger
consistency.
Some further investigation required on skills gaps in Business Services and Legal & Dem Services.
Appropriate training being identified and due date has been amended to November 2025.

Page 22

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
What we will do Due Date Status Progress update
Ensure data owners are aware of
responsibilities and align with Data
Catalogue.
31 December
2025 Data Catalogue updates still being addressed to ensure it is up to date.  The due date has been amended to December 2025.
Review data quality in key line of business
systems and develop improvement plan in
alignment with organisational priorities.
31 December
2025 Some system review has been discussed, e.g. ERP data quality issues - further solutions being investigated (e.g. position data updates by
managers).
Further define data analysis requirements
to improve decision-making and build
capabilities locally within services where
required.
31 December
2025 Data Analysis & Management training being developed and available to services through the DAG. This will be offered at next DAG.
Further follow up specifically in Finance on previous Power BI training and adoption, therefore due date has been amended to December
2025.
Adopt standard dashboards in our ERP as
business-as-usual.
31 December
2025
The ERP Team continue to add these and update the relevant teams where they believe there is a benefit to the service having an overview
of the data or workflow process. Please note that many of these are created by the ERP Team, using their own knowledge and expertise to
support Core Teams and others. Rarely do the ERP teams receive specifications, requests, or amendments for workspaces/dashboards,
and this is an area that is being worked on with the likes of the DAG group. This data is, and should be, important to the organisation,
services and partners that have data or processes within the ERP.
• Cyber Security Workspace (now including Information Classification ilearn mandatory course)
• Workforce planning Workspace
• Scotland Excel (partner org) HR Workspace
• School Management Workspace including flexible working and vacant position detail.
• Finance Structure Manager Workspace
• Finance Structure Accountants Workspace
CPU Workspace - Approver and Requisitioner Mandatory Course Attendance, Requisition/PO workflow monitoring, etc.
Support the next phase of the long-term
Transformation and Change Programme,
‘Reshaping Renfrewshire’, including
development of the Transformation Board
31 March 2027
The aim of this action is that the Council is able to maintain a balanced budget over the medium term within the context of a challenging
financial environment. This has so far been achieved for 2025/26, the first of the five financial years in scope. The Transformation Board
has met 7 times and considered updates and progress on a wide range of projects and programmes, providing advice and guidance as
required.

Page 23

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Children and Young People
What we will do Due Date Status Progress update
Contribute to the Council’s commitment to
The Promise for all care experienced people 31 March 2026
Earlier this year, the People & OD Team completed training on the role of Promise Keepers and committed to embedding
#KeepingThePromise within updated HR and OD policies and processes. This reinforces our pledge to ensure care-experienced
employees are fully supported and that this commitment is consistently applied.
On 29 July 2025, the Promise Ambassador secured approval from CMT to guarantee interviews for care-experienced candidates who meet
the essential criteria. This initiative is designed to remove barriers and promote fairness. Work is now underway with the Recruitment
Team to update MyJobScotland and Talentlink, and a new field will be added to Businessworld ERP to track and monitor the impact of
this approach.

Page 24

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25
Explanation of performance
Value Target Value Target Value Target
FINSUS1 Total useable reserves as
a % of council annual budgeted
revenue
49.2% Data only 43.2% Data only * Data only
The Council planned the use of earmarked reserves to
fund the budgeted deficit in 2023/24. A similar % is likely
to continue into 24/25.
*This is an LGBF indicator and data for 2024/25 is not yet
available.
FINSUS2 Uncommitted General
Fund Balance as a % of council
annual budgeted net revenue
2.2% Data only 2.06% Data only * Data only
Minor reduction due to use of the Uncommitted Balance
to fund emergency charity donations.
*This is an LGBF indicator and data for 2024/25 is not yet
available.
FINSUS3 Ratio of Financing Costs
to Net Revenue Stream - General
Fund
3% 3.47% 3.13% 3.47% * 3.47%
Marginal increase due to the impact of interest rates over
the year; expected to continue over the next 12 months.
*This is an LGBF indicator and data for 2024/25 is not yet
available.
FINSUS4 Ratio of Financing Costs
to Net Revenue Stream - Housing
Revenue Account
32.5% 28.59% 27.7% 28.59% * 28.59%
Principal loan repayments from the HRA loans fund was
also lower in 2023-24 due to older debt being fully paid
off in 2022-23.
* This is an LGBF indicator and data for 2024/25 is not yet
available.

Page 25

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Place
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25
Explanation of performance
Value Target Value Target Value Target
FINSUS5 Actual outturn
as a percentage of
budgeted expenditure
101.7% 100% 100.5% 100% * 100%
Indicator over 100 here shows an overspend against budget. In 23/24 this was due
to a number of inflationary factors, including pay and fuel, and increased cost of
children’s residential care. The council is expected to overspend again in 24/25
owing to HSCP pressures.
Final data for 2024/25 is not yet available.

Page 26

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Economy
Indicator Current
Status
Short
term
trend
Long
term
trend
2022/23 2023/24 2024/25
Explanation of performance
Value Target Value Targe
t Value Targe
t
% of procurement
spend spent on
local enterprises 19.3% 23% 20.2% 23% * 21%
In the period 2023-2024 Renfrewshire Council recorded direct spend of £56.4 million with businesses
based Locally. This accounted for 19.58% of the Council’s total spend. A further 59.38% of our spend
was with businesses located in bordering local authorities (Glasgow, Inverclyde, North Ayrshire, East
Renfrewshire and West Dunbartonshire).
The update to our Standing Orders Relating to Contracts in June 2023 included increasing the
threshold for the use of Quick Quote for Works contracts up to £500,000 with a requirement that where
possible, a minimum of 75% local businesses should be invited to quote.
Increasing direct spend with local businesses is a key element of Community Wealth Building and the
use of public procurement to facilitate or support such generation, circulation and retention of wealth
locally is a measure set out in the new Community Wealth Building Bill (as introduced on 25th March
2025).
In addition, the Corporate Procurement team and Economic Development are working closely to
encourage more local businesses to participate in market engagement for the development of future
council frameworks and to bid for work on frameworks due for renewal. Work is ongoing to identify
ways to support services to identity and invite quotes from local businesses for Quick Quotes and
updates to the new Purchase to Pay system will create opportunity for better recording of local
suppliers and help to identify potential opportunities to increase local engagement with certain areas
of spend where appropriate.

Page 27

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Time taken for processing
new housing benefit
applications up until the
posting of notification of
outcome of the application
(cumulative)
18.99 24 17.93 24 16.24 24 17.2 24 Processing speed for New Claims was well within
target for Qtr 2 of 2025/26.
Time taken for processing
change of circumstance
housing benefit applications
up until the posting of
notification of outcome of the
application (cumulative)
8.1 10 4.3 10 4.4 10 4.03 10
Change of Circumstances processing was well
within target for Qtr 2 of 2025/26 and has
improved on previous quarter.
Average speed of processing a
Crisis Grant (Scottish Welfare
Fund) in days
2 2 2 2 2 2 2 2 The service continues to meet the target for
processing Crisis Grants.

Page 28

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Fair
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Average speed of processing
a Community Care Grant
(Scottish Welfare Fund) in
days 10 15 10 15 9 15 8 15
The service continues to process Community Care
Grants within the target; 8 days with a target of 15.

Page 29

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Green
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Print volume – number of
pages printed by council
services New indicator for 2025/26 New indicator * * * * *Baseline information is being established.

Page 30

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Cost of collecting council
tax per chargeable dwelling £8.00 £11.50 £7.77 £11.50 Not measured for quarters
This indicator reports on the cost of collecting
Council Tax per chargeable dwelling.
For 2024/25, the total cost of collecting Council
Tax for Renfrewshire Council is £714,305
The number of eligible dwellings in 2024/25 is
91937.
Cost per dwelling is therefore £7.77.
This is a decrease on the prior year, owing to
vacancies and efficiencies in the teams involved in
Council Tax Collection. This has been partially
offset with an increase in Postage Costs and
Commission based Debt Recovery. The number of
dwellings has increased by 0.46% compared to last
year.
Percentage of Council Tax
due in the year, collected by
the end of the year
(cumulative position to date)
94.28% 96% 94.49% 96% 32.73% 32.76% 59.26% 60.27%
At the end of Q2 Council Tax collection was up 0.07%
on the 2024/25 position. The service continues to
maximise collection through timeous recovery
activity using all tools at its disposal, including
working with our recovery agents.

Page 31

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Percentage of income due from
Council Tax for prior years
(cumulative position to date)
97.19% 97.27% 97.12% 97.27% 96.28% 97.27% 97.01% 97.27%
Collection at the end of Q2 is down slightly on Q2 of
2024/25 (0.06%).
Follow up continues to be run each month and prior
year collection is monitored.
Percentage of Non Domestic
Rates due in the year, collected
by the end of the year
(cumulative to date)
96.95% 98% 97.22% 98% 22.28% 20.17% 54.53% 51.4%
Collection at the end of Q2 was down by 1.93% on
the equivalent position for Q2 2024/25. Analysis is
ongoing to establish if this shortfall has been caused
by a timing issue with some larger payments.
F&R Front Line complaints
(Cumulative) 86.6% 85% 91.9% 85% 93.9% 85% 90% 85%
The service dealt with 183 frontline complaints in Q1
and 124 in Q2.  Performance is based on issuing a
response within 5 days and target was exceeded in
both quarters.
Total % of investigation (Stage
2) complaints responded to
within targets by Finance &
Resources  (cumulative to date)
94% 85% 97% 85% 98% 85% 91% 85%
The service dealt with 50 investigation complaints in
Q1 and 56 in Q2.  Performance is based on issuing a
response within 20 days and has exceeded the target
in both quarters.

Page 32

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Number of invoices paid within
30 days of receipt, as a
percentage of all invoices paid
council wide (cumulative)
96.82% 96% 97.83% 96% 95.2% 96% * 96%
At the end of Qtr 1 a total of 65,448 invoices were
received of which 62,308 were processed within 30
days (95.20%). Performance is marginally behind
target this period, but it is expected to improve over
the reporting year.
*Q2 data not yet available
Average days Small and
Medium sized businesses
invoices paid 7.5 28 5.27 28 4.44 28 * 28
At the end of Qtr 1 (01/04/25 - 30/06/25) 29,530 SME
invoices were received of which 28,855 were
processed within 28 days (97.71%) with the average
days to process an invoice reported at 4.44
days. Target has been achieved for this reporting
quarter.
*Q2 data not yet available
Average number of work days
lost through sickness absence
per employee (F&R) (FTE)
8.9 8.5 8.96 8.5 2.06 2 2.51 1.9
Absence has increased this quarter, with a larger
number of Musculo-skeletal cases this quarter.
Performance is behind target.
% of Finance and Resources FOI
requests completed within
timescale 95% 100% 96% 100% 96% 90% 92% 90%
During Qtr 2 2025/26, Finance & Resources dealt with
106 single service FOIs of which 97 were completed
within timescale.
During the summer, availability of colleagues who
can provide input into requests tends to be impacted
and this may have a knock-on effect to our ability to
progress requests within the statutory timescale.

Page 33

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Percentage of Audit Plan
completed (cumulative 92% 95% 93.6% 90% 17.6% 18% 38.2% 41%
Progress for Qtr 2 was reported as 38.2%, just slightly
below 41% target.  This is due to a vacancy within the
team impacting on capacity.
Percentage of new FAR staff
completing corporate induction
within 30 days of start date
New for 2025/26 67% 100% 36% 100%
This is a new indicator and currently reflects only
staff who completed all nine iLearn modules within
30 days of starting. Completions beyond the 30-day
period are not included. Face-to-face induction is
also excluded at present, but work is underway to
capture and record this on BW ERP, which will
increase the reported completion rate.
In Q1, there were 12 new starts, and in Q2, 22 new
starts. Managers and employees have been reminded
to complete induction training as soon as possible.
Local service inductions are carried out from the first
day of employment.
Percentage of FAR staff who
have completed all mandatory
training
New for 2025/26 94% 100% 95% 100%
Performance targets for mandatory training are
reviewed monthly by the Services SMT. Business
World alerts are in place to prompt managers and
employees, reinforcing the importance of completing
training on time.
Percentage of FAR staff who
have participated in a Personal
Development 1 to 1 discussion 
within the last year
New for 2025/26 New for 2025/26 Not measured for quarters This is an annual indicator and data will be available
at the end of 2025/26.

Page 34

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
Short
term
trend
Long
term
trend
2023/24 2024/25 Q1 2025/26 Q2 2025/26
Explanation of performance
Value Target Value Target Value Target Value Target
Percentage of new Council staff
completing corporate induction
within 30 days of start date
New for 2025/26 12% 100% 14% 100%
This is a new indicator and currently reflects only
staff who completed all nine iLearn modules within
30 days of starting. Completions beyond the 30-day
period are not included. Face-to-face induction is
also excluded at present; however, work is underway
to capture and record this on BW ERP, which will
result in a higher reported completion rate. There
were 191 new starts in Q1 and 311 in Q2. Managers
and employees have been reminded to complete
induction training as soon as possible. Local service
inductions are delivered from the first day of
employment. There has been some improvement
between Q1 and Q2.
Percentage of Council staff who
have completed all mandatory
training
New for 2025/26 59% 100% 71% 100%
The percentage of employees completing mandatory
training has shown consistent month-on-month
growth, driven by regular oversight from the
Council’s CMT and individual Services SMTs. Efforts
will continue to improve completion rates, supported
by Business World alerts that remind managers and
employees of the importance of timely training. Q2
has saw a modest improvement from Q1.
Percentage of Council staff who
have participated in a Personal
Development 1 to 1 discussion 
within the last year
New for 2025/26 New for 2025/26 Not measured for quarters This is an annual indicator and data will be available
at the end of 2025/26.
Percentage of Data Advisory
Group meetings with
attendance from FAR staff
New for 2025/26 80% 100% 100% 100%
All FARS services have been represented at the DAG
in Q2.

Page 35

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Finance and Resources
Service Improvement Plan 2025 - 28
Six-monthly progress update
November 2025