Facilities and Property Service Update Report

Renfrewshire Council · 20 November 2025
Back to Finance, Resources and Customer Services Policy Board — 20 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC 
To: Finance, Resources and Customer Services Policy Board
On: 20 November 2025 
Report by: Director of Environment, Housing & Infrastructure 
Heading: Facilities and Property Services - Service Update Report 
1 Summary 
1.1 Environment, Housing & Infrastructure brings together a range of Council
services and activities, with both strategic and operational responsibilities. This
report provides an operational performance update on Facilities Management
(Hard and Soft Services), Building Services and Property Services delivered by
Environment, Housing & Infrastructure since the last Policy Board in September
2025. 
2 Recommendations
It is recommended that members of the Finance, Resources and Customer
Services Policy Board: 
2.1 Note the content of this report. 
3 Operational Update 
Hard Facilities Management (Hard FM) 
3.1 Public Buildings – Capital Projects 
3.1.1 As part of on-going improvements for sports/activities across the learning estate,
Officers are currently exploring the provision for additional MUGAs and upgrades
to red blaes pitches, within a number of primary schools. These works will be
discussed with Children’s Services and undertaken on a priority basis as the
budget allows.   
3.1.2 A Net Zero Collaboration Group has been set up to with our colleagues in the
Sustainability team, Hub West Scotland and other local authorities to share
knowledge and best practice. Officers will play a key role and contribute to
buildings and the Council’s route towards net zero.

Page 2

PUBLIC 
3.1.3 Waterproofing/ramp works continue at Renfrewshire House, with expected
completion revised to late November 2025. 
3.2 Public Buildings - Lifecycle Replacement works 
3.2.1 The Summer recess was a busy period for Facilities and Property Services to
undertake work whilst the schools are closed. In addition, improvement works,
including the accessible toilets have been completed at St Fillan’s PS and
Houston PS. 
The table below highlights some work that has recently been completed. 
2025/26 (New Works) 
Site Work Required
St Margaret’s PS Pot-holes/tarmac
Auchenlodment PS Pot-holes/tarmac
Lochwinnoch PS Tarmac/painting/water proofing and
pedestrian barrier
Renfrewshire House Painting/CCTV
Renfrew HS Tarmac
Castlehead HS Flooring upgrade
Mile End Centre Front Fence repaired and rear fencing
replaced
Brediland PS (Annex) Tarmac
Houston PS Lining works
Bishopton PS Lining works
St John Ogilvie PS Accessible Painting works
Lochfield PS Accessible grab rails
Bargarran PS Life floor replacement
Bushes PS Tarmac
Records Store Fire rating works and alarm panel
Gallowhill PS Tarmac
Williamsburgh PS Sunken gulley
Heriot PS Painting
Kilbarchan PS Cracked sky light repair
Paisley Library Lift works
Kirklandneuk PS Scaffolding and unit replacement
Paisley Town Hall Water leak/damage 
PPP Lifecycle works 
• The Council still await the full 25/26 Lifecycle Report from Renfrewshire Schools
Partnership (RSP) to ascertain any under/overspend within the Lifecycle Fund.

Page 3

PUBLIC 
• Works that were carried out over the October break:
o Gleniffer HS: flooring replacements 
o Linwood HS: flooring replacement & decoration
o St Benedict’s HS: Clear and re-tank lift shaft 
3.3 Public Buildings – Reactive/General Improvement works: 
3.3.1 The Hard FM team are currently working on the following commissions:
• Condition surveys for various community buildings (19 buildings in
total). Surveys have concluded and reports are being reviewed.
• HQ Building Management System upgrade - options appraisal includes
the installation of new routers and is currently being finalised with ICT.  
• HQ lining of car park, general clean up and drainage works. Proposals
include creating new walkways and other measures to maximise
available spaces (possibly some additional parking), 
• Heriot Primary School – roofing and heating works. Phase 1 temporary
heating works now complete.
• Charleston Clock Tower – refurbishment of clock structure and
surrounds. 
• Underwood Road Depot – improvements to depot safety and security on
going. Progress to date includes interlinking of all fire alarms systems.
Further works required to intruder systems, barriers and access control. 
3.3.2 Officers continue to be involved in Paisley Grammar School and Community
Campus, Park Mains High School extension and Thistle Primary School to
future proof works in relation to compliance, maintenance and repairs. 
3.3.3 Renfrew Bridge Control room has now been added to CAMIS with Planned
Preventative Maintenance (PPM) commencing with reporting process to be
agreed with colleagues using the building. 
3.4 Public Buildings compliance – Key Performance Indicators (KPIs) 
3.4.1 Compliance stats for this quarter remain on target with Building Services
returning 86% compliance and Sub-contractors 86%. Officers will continue to
monitor to ensure high levels are maintained. 
3.4.2 Overall performance for this period continues at 100% within the PPP Schools
estate. 
3.5 Public Buildings - Repairs data 
3.5.1 The repairs profile remains as expected, as detailed below: 
2025/26
Repairs
Education Core Prestige OneRen Total
4444 1118 561 152 6275 
The pressure on the repairs budget remains a challenge and Officers will likely
defer non-critical works from November 2025 onwards.

Page 4

PUBLIC 
3.5.2 The new Multi-Trade Framework is progressing at the anticipated pace, with an
update as below: 
• 13 Lots forming the Framework agreement with a maximum of 5
suppliers per Lot.
• There is a ranking arrangement within each Lot.
• 20 individual suppliers who have been recommended for various Lots on
this Framework.
• Stand still period concluded 31 October 2025 and award letters issued in
November 2025.
• Mobilisation pack has been developed by Corporate Procurement Unit
and pre-start meetings have been arranged. 
Moving forward, Officers will need to build new relations and closely monitor any
new suppliers, to ensure contractual obligations are met. 
3.6 Fire Safety 
3.6.1 All 9 Fire Risk Assessments for PPP schools have been received recently.
Actions for both the school and AMEY are currently being worked through with
some already completed. 
3.6.2 Officers are currently exploring training on sprinklers systems for Soft FM staff
across the learning estate. 
3.7 Responsive Repairs 
3.7.1 The numbers shown below are only the repairs carried out by Building Services
on behalf of Housing Services from April 2025 to September 2025. 
Annual repair data from 2023, 2024 and 2025 is now available to allow a

Page 5

PUBLIC
comparison and analysis of the trends. It can be seen that the years follow each
other across the months with the summer months having the least number of
repairs and the winter months having the most. It can also be seen that there are
larger increases when there is a severe weather event – freezing weather in
Christmas 2022/23 and storms in January 2025. 
3.7.2 Repairs to Public Buildings 
Building Services carry out responsive repairs across public buildings and OneRen
properties across Renfrewshire. Officers are working with our colleagues within Hard FM
to ensure the categorisation of the urgent repairs is correct. In August there was a drop
from 49% to 42% of all repairs being reported in the emergency or urgent categories and
are now appropriately categorised as routine. Building Services have also seen a rise in
the percentage of urgent and routine repairs being completed within target and are
committed to continue improving these percentages. 
% OF REPAIRS COMPLETED
WITHIN TARGET 
New     
Target  Apr-25 May-25 Jun-25 Jul-25 Aug-25
Emergency Completed (E) 24
hours  99% 77% 97% 96% 97% 99%
Urgent Completed (U5) 5
days  95% 62% 47% 55% 59% 62%
Routine Completed (A) 15
days  90% 85% 84% 77% 83% 90%
Programmed Completed 90
days   100% 100% 100% 100% 100% 100%
Planned 247 days  100% 100% 100% 100% 100% 100% 
3.7.3 Compliance - Public Buildings
Building Services carry out compliance works across a number of areas including the
categories below. Officers continue to track and monitor data to maximise and increase
the compliance of the Renfrewshire Council estate. The drop in electrical compliance
percentage is due to the certificates requiring to be validated by the Qualified Supervisor
and not due to the works not being carried out. 
Element of compliance    targets Apr-
25
May-
25 Jun-25 Jul-25 Aug-
25 Sep-25
Electrical (including MUGA's)   90% 88% 92% 91% 90% 96% 84%
Emergency lighting   90% 72% 86% 87% 87% 93% 84%
Water
Management (including
showers and swimming
pools) 
90% 75% 100% 99% 100% 80% 99%
Gas    90% 100% 100% 92% 100% 100% 100%
HVAC 90% 99% 89% 86% 94% 100% 97%
Canopies   90% 98% 100% 93% 100% 95% 98% 
3.8 Voids 
3.8.1 From July 2025 through September 2025, Building Services void team have
received 393 job orders, with full void packs making up 152 of these works, this

Page 6

PUBLIC
is a slight reduction in work from Q1 year where Building Services received 163
full void packs. However, the volume of work in individual void properties has
continued to increase. 
3.8.2 The increased remedial workload in void properties makes keeping within KPI
targets challenging, although Building Services continue to use every available
resource to make these achievable, with reports showing the average void
days for Building Services in Q2 was 14.88 days. This highlights a consistent
reduction since the start of the Single Void team was introduced and sits at the
lowest value since its introduction. 
3.8.3 Operatives continue to attend and change locks to terminations, absconds and
evictions which have seen a reduction to 18 in Quarter 2 from the annual
average of 22 per week. 
3.8.4 Building Services have continued the implementation of the 360° Viewing
Technology with a mix of 252 post and pre-tenancy tours carried out over Q2,
this brings the total number of tours carried out since the technology was
introduced last year to 1,394. 
3.9 Electrical Testing programme 
3.9.1 There is currently a programme for carrying out the Electrical Installation
Condition Report (EICR) testing across both Housing properties and Public
Buildings. Building Services are working hard to ensure that the electrical
compliance across both domestic and public buildings is maintained. 
3.9.2 For every electrical job carried out across Renfrewshire, even minor works,
there requires to be an electrical certificate issued by the electrician and then
fully checked by the Electrical QS (Qualified Supervisor) before it is issued. The
chart below demonstrates the volume of electrical work and certificates that are
being managed by Building Services. Due to the volume and level of
certification required Building Services are currently seeking an additional
Electrical QS to be able to help manage the increasing volume of legally
required certification, the number of certificates has increased by 449 from
Quarter 1.

Page 7

PUBLIC 
3.10 Gas servicing 
3.10.1 From July 2025 to the end of September 2025, the domestic gas servicing
and repairs team carried out 3,249 gas services. This is broadly in line with
the gas services carried in the previous 2 years. 
3.11 Kitchen and Boiler Replacement Programme 
3.11.1  Building Services have commenced work to put a programme in place to replace a
substantial number of kitchens and gas boilers throughout the estate. Surveys and pre-
measures have commenced, and boiler installations began on the 23 July 2025 and
Kitchen installations started in August 2025. 
3.11.2  Boilers

Page 8

PUBLIC
Building Services are now continuously fitting 16 Boilers per week. There were 46
completed within the month of September 2025. 100% inspection checks from Building
Services have been undertaken and agreed inspections by Housing Services Quality
Officers. All categories are achieving positive feedback, initial costs are coming in under
the agreed tender price (constantly kept under review). These prices are also inclusive of
Client (Housing Services) agreed variations to the works. 
3.11.3 Kitchens 
Building Services are now commencing with the agreed Key Performance Indicator (KPI)
of 8 kitchens per week. There have been 18 kitchens completed to date. 100% inspection
from Building Services with inspections by Housing Services Quality Officers and all
achieving positive feedback. 
Initial costings are currently under the tender agreed price with additional client agreed
variations, these are recorded and agreed by the client team and range from a new
kitchen pass door, additional floor screeding, rewiring various electrical elements to
ensure compliance and any additional decoration required. 
3.12 Capital / Planned Works 
3.12.1 School Toilet Refurbishments 
Works are currently ongoing to refurbish school toilets. This has been an
ongoing program working through the education estate to improve the toilets
within schools. Works include Wetwall, vinyl flooring, ceilings, new sanitary
ware and plumbing, all electrics including hand dryers, new radiators, new
cubicles vanity units and decoration. 
Building Services have recently completed Rashielea Primary school with work
commenced in Barsail Primary on the 25 August 2025, St Charles Primary School is
programmed to commence on the 17 November 2025 and the work is scheduled to
complete in late December 2025. 
3.13 Apprentices/Training 
3.13.1  The 5 new youth apprentices and 2 new adult trade apprentices have now
started and participated in a 2-day induction process. They commenced their
college training in August and September depending on which trade they are
training in. 
4     Soft Facilities Management (Soft FM) 
4.1 School Meals 
4.1.1 The Pilot for the rollout of the pre-order app commenced on 20 January 2025 in Park
Mains High School and August 2025 in Castlehead High School. So far, Park Mains
High School has 424, and Castlehead High School 247 pupils registered for the use
of the app with Children’s Services supporting the implementation by promoting
information to parents and pupils. There has been a positive reaction by pupils due to
the reduction in queuing time and the ability to ensure they access their preferred
choice for lunch. The remaining secondary schools are prepared to go live as soon as
possible.

Page 9

PUBLIC
4.1.2 The pre-order app was implemented in the PPP school estate to senior pupils at St
Benedicts High School on their return from the Easter break. 304 Pupils have
registered and actively using the app to pre-order food. A school communication is
being arranged to target pupils who have yet to sign up for the app. 
4.1.3 A new primary menu was implemented on 16 June 2025, and the new Secondary
Menu was implemented in the first week of September 2025. Amey implemented a
menu change in the PPP primary school estate at the start of the new term in August
2025. Amey implemented a new Secondary menu after the October break. 
4.1.4 Refurbishment of 4 school kitchens commenced in the summer holiday period. Heriot
Primary, Our Lady of Peace Primary, Kilbarchan Primary and St Margaret’s Primary
will all return to full cooking operation by 21 November 2025. 
4.1.5 Partial cooking kitchens are in place in 5 sites, West Primary, Williamsburgh Primary,
St Fergus Primary, Lochwinnoch Primary & Lochfield Primary. Staff have been
recruited; equipment installed, and training completed. These kitchens were fully
operational by early October 2025, improving the quality of meals within these sites. 
4.1.6  Professional Cookery Course - Level 6 implemented in partnership with West College
Scotland over the summer break. 14 Senior Facilities Officers (SFO) – Production
Cooks attended the 4-week course to further develop employee skills. A further 4
Term-Time employees are due to attend an 18-week, day-release course for the same
qualification. 
4.1.7 HMIE Health & Nutrition inspection undertaken at Glencoats Primary School on 7
October 2025 with positive feedback obtained for the school kitchen.   
4.2 Scottish Child Payment 
4.2.1 Work continues to increase the number of pupils attending universal free school meals
(P1-P5), free school meals and paid meals across both primary and secondary
schools. 
4.2.2 A process was implemented on 4 April 2025 where Parents/Carers of pupils in P6/7
that are eligible for Scottish Child Payment can apply for Free School Meals. A low
number of applications have been received to date; information has been shared to
families as part of the general contact relating to School meals, Clothing grants and
changes to eligibility criteria. 
The overall average uptake figures for School meals (Periods 1-3)
• 56.5% overall for FSM & UFSM 
• 70.5% UFSM (P 1-5)
• 28.7% FSM (P 6-7) 
Discussions are being undertaken as to how this can be improved, which will ensure
“real time” attendance figures can be utilised to reflect accurate uptake figures. 
4.2.3 The Scottish Government has provided Local Authorities with data on all eligible pupils
in P6/7. So far, 79 pupils eligible for FSM under the new criteria have applied and are
now receiving FSM. A further 741 are eligible and currently being contacted.  Soft FM
remains confident it can facilitate the additional numbers due to the work undertaken
previously, the re-instatement of additional cooking establishments and the capital

Page 10

PUBLIC
work undertaken throughout summer 2025. 
4.3 Cobotics 
4.3.1 8 Cobotic cleaners were purchased in July 2025. The contractor provided site-specific
mapping and programming; this was completed in time for the schools reopening after
the summer break. Training of all Senior Facilities Operatives (SFOs) was carried out
18-22 August 2025 and all 8 machines are now fully operational.  
4.3.2 This investment in collaborative robotic cleaning technology highlights Renfrewshire
Council’s commitment to innovative, efficient solutions in building cleaning. 
5     Technical Services 
5.1 Current Commissions 
5.1.1 Officers within Technical Services continue to work across the Renfrewshire
Council’s property portfolio and given the workload, major projects are reported
to the respective Board e.g. Education and Children’s Services Board. 
5.2 School Kitchen Expansion 
5.2.1 As detailed in the Soft FM update, works commenced on site on 9 June 2025
on all four sites and will be completed by the end of November 2025. 
5.3 Infrastructure Programme 
5.3.1 The Latest developments within the Cultural Infrastructure Programme are
listed below:
• St James Playing Fields: Defect rectification is ongoing and Making Good
Defects (MGD) is still programmed for December 2025. Issue with Scottish
Water (wastewater) connection, now closed. Small path being installed
around playing field, going out to tender shortly. 
• ON-X Running Track: Defect rectification ongoing and MGD programmed
for September 2025. Officers to follow up and issue MGD, no reported
issues.
• ON-X Hockey Pitch: Defect rectification ongoing and MGD programmed for
October 2025. Officers to follow up and issue MGD, no reported issues.
• Renfrewshire House Archive Store Waterproofing/Ramp Upgrade
o The commencement date was 12 July 2025, the existing condition
of the ramp was in much worse condition that anticipated from the
trial pits that were dug as per the site investigation works. Works
currently delayed by 7 weeks with a completion date of end
November anticipated. Concessions were made by the contractor to
allow for the Halloween event to take place where the contractor’s
site area currently sits. The site area was temporarily moved to allow
space for the venders to be sited.
• Heriot PS Boiler House Heating Pipe Replacement
o Tender documents have been revised and updated to capture some
of the issues identified as part of the initial tender process. The
works are programmed for site commencement in summer 2026.
Major repairs have been completed to allow the building to operate
as normal.

Page 11

PUBLIC 
5.4 Life Cycle Maintenance: Schools Retrofit Programme 
5.4.1 External consultants are currently being engaged to carry out feasibility studies
on potential energy efficiency upgrades across five initial school and ELCC
sites. A procurement exercise/approach has been agreed and will be taken
forward. Hard FM has directed Technical Services to initiate a pilot project at
Douglas Street ELCC. 
5.5 Life Cycle Maintenance: General Programme 
5.5.1 Technical Services, in collaboration with Hard FM, is currently reviewing the
short-term component renewal programme. The aim is to identify priority works
over the next 1–3 years, focusing on boilers, MUGAs, and other key
components. Proposed projects are being cross-referenced with upcoming
Children’s Services estate plans to avoid duplication and reduce costs. 
Implications of the Report 
1. Financial – Any financial elements referenced in this report will be progressed
through the Council’s financial & budget planning process. 
2. HR & Organisational Development – Apprentice recruitment detailed in the
report will be undertaken as per standard Renfrewshire Council recruitment
processes. 
3. Community/Council Planning – the report details a range of activities which
reflect local community and council planning themes. 
4. Legal – As detailed within the report. 
5. Property/Assets – As detailed within the report in relation to work on the
Council property portfolio. 
6. Information Technology - None 
7. Equality & Human Rights – The recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. If required following implementation,
the actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website. 
8. Health & Safety – Advice and guidance is being given to protect the health and
safety of employees and service users when carrying out priority services for
the
Council in line with government and health guidance.

Page 12

PUBLIC
9. Procurement – As noted within the report. 
10. Risk – None 
11. Privacy Impact – The Scottish Government have introduced legislation to
allow the data sharing with local authorities in relation to parents/carers who
receive the Scottish Child Payment. 
12. COSLA Policy Position – None 
13. Children’s Rights – Facilities and Property Services are essential in trying to
assist and deliver in support of Children’s Rights. In particular, the report
demonstrates compliance by ensuring buildings are suitable provides good
educational establishments (Article 28 - Access to Education) and by delivering
schools meals and nutritious food (Article 27 – Food, Clothing, and a safe
home). 
14. Climate Change – Parts of the work undertaken in this report will reduce
carbon emissions and assist in trying the reach Net Zero targets by improving
efficiency of current buildings and new buildings across the portfolio. 
List of Background Papers 
None 
Author: Gordon McNeil, Director of Environment, Housing & Infrastructure