___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  13 February 2025
___________________________________________________________________
Report by: Report by the Director of Finance and Resources and the Director of
Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Contract Authorisation Report for the Inspection, Testing, Maintenance
and Repairs of Passenger Lifts, Stairlifts and Winches – Council Wide
(RC-CPU-24-145)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Services
Contract for the Inspection, Testing, Maintenance and Repairs of
Passenger Lifts, Stairlifts and Winches – Council Wide (RC-CPU-24-
145) to Jackson Lift Services Limited. 
1.2 The recommendation to award the Services Contract follows a
procurement exercise conducted in accordance with the Public
Contracts (Scotland) Regulations 2015 and the Council’s Standing
Orders Relating to Contracts for an above Threshold Services Contract
using the Open Procedure. 
1.3 A Contract Strategy was approved by the Head of Facilities and
Property Services and the Corporate Procurement Manager in October
2024. 
_________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board:

Page 2

2.1 Authorises the Head of Corporate Governance to award a Services
Contract in the form of a SBCC Measured Term Contract for use in
Scotland, MTC/Scot (2011 Edition) as supplemented and amended by
the Employers Amendments, for the Inspection, Testing, Maintenance
and Repairs of Passenger Lifts, Stairlifts and Winches – Council Wide
(reference RC-CPU-24-145) to Jackson Lift Services Limited. 
2.2 Authorises the approved contract value of up to £750,000 excluding
VAT for the Contract Period, including use of any extension periods. 
2.3 Notes that the Services Contract will be for an initial Contract Period of
3 years with the Council having, at its sole discretion, the option to
extend the contract for additional periods of 12 months on two
occasions only, for a maximum Contract Period of 5 years. It is
anticipated that the Contract will commence on 21 March 2025; if the
Contract does not commence on this date, the Contract will commence
on the date stated within the Council’s Letter of Acceptance. 
2.4 Note that the award of this Contract is subject to Jackson Lift Services
Limited providing the level of Public Indemnity insurance as indicated
within the tender documentation. Jackson Lift Services Limited has
indicated that where successful and prior to an award, they will
increase their insurance cover to the level required.
_________________________________________________________
3. Background
3.1 Within the Council’s property portfolio, there are various types of lifting
equipment installed which are used by members of the public, housing
tenants and Council staff members. Lifting equipment, within the
context of this contract, would be defined as passenger carrying lifts,
stair lifts and chandelier winches. It should be noted that stair lifts within
individual residential properties are not within the scope of this Services
Contract. 
3.2  To ensure reliability of this equipment, minimise breakdowns and
extend the life of the equipment, the Council employs a specialist lift
maintenance contractor to carry out a programme of regular planned
maintenance. The contractor also carries out reactive repairs and
provides a 24 hours per day, 7 days per week, 365 days per year
response to emergency call-outs for entrapments and breakdowns.

Page 3

3.3 To initiate this procurement process, a Contract Notice was published
on the Find-a-Tender Service via the Public Contracts Scotland
advertising portal on 15 November 2024 with the tender documentation
available for downloading from the Public Contracts Scotland - Tender
portal from this date.
3.4                During the live tender period, ten organisations expressed an interest in
the tender. By the closing date set for the return of electronic tender
submissions, 12 noon on 17 December 2024, three organisations
submitted responses, one declined to respond, and six organisations
did not respond. 
3.5                In accordance with Regulation 60 of the Public Contracts (Scotland)
Regulations 2015, Tenderers were required to complete a Single
Procurement Document (SPD) to be submitted with their tender
submission. All three tender submissions were evaluated against a pre-
determined set of Criteria in the form of the SPD by representatives
from the following Council services: Facilities Management, the
Corporate Procurement Unit, Corporate Risk and Corporate Health &
Safety.
3.6                All three tender submissions received complied with the minimum
selection criteria of the SPD. The three tender submissions were each
evaluated against the Award Criteria of 30% Quality and 70% Price.
3.7                The scores relative to the Award Criteria for each of the three tender
submissions are noted below: 
Tenderer Price
(70%)
Quality
(30%)
Total
(100%)
Jackson Lift Services Limited 70.00% 24.75% 94.75%
ADL Lift Services Limited 50.29% 17.25% 67.54%
RJ Lifts Group Limited  33.72% 18.80% 52.52%  
3.8                The evaluation of tender submissions received identified that the tender
submission by Jackson Lift Services Limited was the most
economically advantageous tender.
3.9                The form of Contract is SBCC Measured Term Contract for use in
Scotland, MTC/Scot (2011 Edition) as supplemented and amended by
the Employers Amendments.

Page 4

3.10 The costs for the Inspection, Testing, Maintenance and Repairs of
Passenger Lifts, Stairlifts and Winches – Council Wide will be met
through Environment, Housing and Infrastructure Services Public
Building Repairs Budget.
3.11              Community Benefits were requested as part of the procurement
process and Jackson Lift Services Limited confirmed that the following
Community Benefit would be made available to the Council for this
Services Contract. 
Community Benefit Outcome Description  No of People /
Activities
Work Experience Placement for an
individual aged 14+ years of age 2
S/NVQ (or equivalent) 2
Industry Skill Transfer to Schools 1
Business advice/support to an SME /Social
Enterprise/ Voluntary organisation 1
___________________________________________________________________
Implications of the Report
1. Financial - The budget for this Services Contract will be £750,000
excluding VAT for the full 5-year contract period, inclusive of two
optional 12-month extension periods if utilised by the Council.  This will
be funded from the Environment, Housing and Infrastructure Public
Building Repairs Budget (Revenue). 
2. HR & Organisational Development - None directly arising from this
report. 
3. Community/Council Planning –  
Place 
Working with partners to ensure our neighbourhoods are safe, vibrant
and attractive places to live.
Economy 
Supporting our citizens, particularly those furthest from the jobs market,
into fair work - well paid, fulfilling employment through Community
Benefits
Green 
Ensuring our journey to net zero is a just transition with climate justice
and fairness at the heart, finding opportunities to challenge
inequalities in new green ways as we tackle the climate crisis.

Page 5

Living our values
Ensuring Renfrewshire Council delivers Best Value for our citizens
and customers, that we are a well governed, effective organisation.
Caring for the health and wellbeing of all our workforce, supporting us
to work well and deliver great services. 
4. Legal - The procurement of this Services Contract has been conducted
as an above Threshold Open Procedure in accordance with the Public
Contracts (Scotland) Regulations 2015 and Renfrewshire Council’s
Standing Orders Relating to Contracts. 
5. Property/Assets - This Services Contract will assist the Council in its
legal obligation to ensure that properties within its control are safe to
use and compliant with building legislation. 
6. Information Technology - None directly arising from this report.
7. Equality & Human Rights - None directly arising from this report.
8. Health & Safety - Jackson Lift Services Limited’s health and safety
credentials were evaluated by Corporate Health and Safety and met
the Council’s minimum requirements regarding health and safety.
9. Procurement – The procurement procedure outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency, and modern Government.
10. Risk - Jackson Lift Services Limited’s insurances have been assessed
and evaluated to confirm that they meet the minimum requirement
regarding insurance risk, excluding Professional Indemnity insurance to
the level required under the tender, for which the Jackson Lift Services
has confirmed they will obtain prior to the award of this Contract.
11. Privacy Impact - None directly arising from this report.   
12. Climate Risk – The level of impact associated with provision of these
works has been assessed using the Scottish Government Sustainability
Test and is considered low risk.
• Carbon Energy Consumption – The contractor will be required
to consider energy saving measures where possible. 
• Carbon – Vehicle Emissions – Vehicles will be routinely used
for the delivery of supplies and resources to the sites.

Page 6

The Contractor will consider the pollution from their vehicles
when working on site and to switch off the engine when not
using to prevent unnecessary emissions. 
13. Children’s Rights – This report does not cover a new policy, function
or strategy nor a substantive change to an existing policy, function or
strategy which will have an impact on children’s rights.
14.  Cosla Policy Position – None directly arising from this report. 
_________________________________________________________
List of Background Papers - None
___________________________________________________________________ 
Author:           KerriAnne Ben Ammar, Senior Procurement Specialist