___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 13 June 2024
___________________________________________________________________
Report by: The Director of Finance and Resources and the Chief Executive
Services
___________________________________________________________________
Heading: Contract Award: Tandlemuir Farm Peatland Restoration (RC-CPU-23-
247)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek approval of the Finance,
Resources and Customer Services Policy Board to award a Works
Contract for Tandlemuir Farm Peatland Restoration (RC-CPU-23-247)
to McGowan Environmental Engineering Ltd. 
1.2 The recommendation to award the Contract follows a procurement
exercise conducted in accordance with the Council’s Standing Orders
Relating to Contracts for a below Regulated (Works) contract using the
Open Procedure. 
1.3 A Contract Strategy was approved by the Strategic Commercial
Category Manager and the Head of Economy and Development
Services on 28 March 2024.
___________________________________________________________________ 
2. Recommendations
2.1  It is recommended that the Finance, Resources and Customer
Services Policy Board:

Page 2

(a) Authorises the Head of Corporate Governance to award a Works
Contract in the form of NEC3 Engineering and Construction Short
Contract with Z clauses, for Tandlemuir Farm Peatland Restoration
(RC-CPU-23-247) to McGowan Environmental Engineering Ltd, subject
to confirmation of funding from NatureScot. 
(b) Authorises the award of the Contract for the Total of the Prices
(Approved Contract Value) of £297,498.22 excluding VAT, subject to
confirmation of funding from NatureScot. 
(c) Notes that the anticipated starting date is 2 September 2024, and the
completion date is 16 weeks from the starting date. The actual dates
will be confirmed in the Council’s Letter of Acceptance to McGowan
Environmental Engineering Ltd. 
_________________________________________________________
3. Background
3.1  The Planning and Climate Change Board on 7 November 2023 noted
the development of the Glasgow City Region ‘Clyde Peatlands’ project
and delegated authority to the Head of Economy and Development to
progress implementation of peatland restoration works at West
Tandlemuir Farm, Lochwinnoch. As Renfrewshire Council is aiming to
be net zero by 2030, this project will have a positive impact by reducing
the risk of flooding and the impact of climate change. The project will
support the Council’s response to climate change and the delivery of
Renfrewshire’s Plan for Net Zero through the storage of carbon
emissions and works which support, enhance and connect existing
habitats. This is one of the most effective ways of locking in carbon,
offering a clear nature-based solution to the climate crisis. 
3.2 The works comprise of Peatland Restoration within an area of 250
hectares at Tandlemuir farm Clyde Muirshiel Regional Park,
Lochwinnoch.  
3.3 The award of this contract at Tandlemuir Farm Peatland Restoration is
dependent upon Peatland Action funding from NatureScot. The Council
expects to know the outcome of this funding application in June 2024.  
3.4 To initiate this procurement process, a Contract Notice was published
on the Public Contracts Scotland advertising portal on 8 April 2024 with
the tender documentation available for downloading from the Public
Contracts Scotland- Tender portal from this date.

Page 3

3.5  During the live tender period, twenty organisations expressed interest
in the tender. By the closing date set for the return of electronic tender
submissions, 12 noon on Thursday 2 May 2024, five organisations
submitted responses and fifteen organisations did not respond. 
3.6                In accordance with the Council’s Standing Order relating to Contracts
standing order 11.5, Tenderers were required to complete a Single
Procurement Document (SPD) to be submitted along with their tender
submission. One of the tenderers failed SPD question 4C.1 as none of
the examples provided demonstrated relevant experience to deliver the
work as stated within the Contract Notice and Works Information,
therefore they were removed from the procurement process. The
remaining four tender submissions were evaluated against a pre-
determined set of criteria in the SPD by representatives from the
following Council services: Regeneration, NatureScot, the Corporate
Procurement Unit, Corporate Risk and Corporate Health & Safety.
3.7                The remaining four tender submissions received each complied with
the minimum selection criteria of the SPD. Each tender submission was
then evaluated against the Award Criteria of 60% Quality and 40%
Price.
3.8                The scores relative to the Award Criteria for each of the four tender
submissions are noted below:                     
Tenderer Price
(40%)
Quality
(60%)
Total
(100%)
McGowan Environmental
Engineering Ltd 27.47% 57.25% 84.72%
Net Zero (North) Limited 40.00% 34.25% 74.25%
Robertson Fencing Ltd 20.44% 38.75% 59.19%
DC Restoration Contracts Ltd 29.48% 12.50% 41.98% 
3.9                The evaluation of tender submissions received identified that the tender
submission by McGowan Environmental Engineering Ltd was the most
economically advantageous tender.
3.10              The form of Contract is NEC3 Engineering and Construction Short
Contract with Z Clauses.
3.11 The costs for the Tandlemuir Farm Peatland Restoration are dependent
on Peatland Action grant funding from NatureScot.

Page 4

3.12              Community Benefits were requested as part of the procurement
process and McGowan Environmental Engineering Ltd confirmed that
the following Community Benefit would be made available to the
Council for this Contract. 
Community Benefit Outcome
Description 
No of People /
Activity
Financial support for a Social Enterprise 1 
___________________________________________________________________
Implications of the Report
1. Financial- The cost of £297,498.22 excluding VAT will be fully funded
by a Peatland Action grant from NatureScot. If the full amount of
funding is not received this contract will not be awarded.  The
anticipated starting date is 02 September for a period of 16 weeks. 
2. HR & Organisational Development - None directly arising from this
report. 
3. Community/Council Planning –  
Creating a Sustainable Renfrewshire for all to enjoy - Clyde
Peatlands will support the Council’s response to climate change and
delivery of Renfrewshire’s Plan for Net Zero and Renfrewshire
Biodiversity Strategy 2018-2022 through the storage of carbon
emissions and works which support, enhance and connect existing
habitats.
 Place- Adopting a 'place shaping' approach to developing our
communities - working together to maximise our collective impact
and influence across economic, social, physical, cultural and
environmental policies and practices.
 Economy- Improving lives and securing wellbeing through a
stronger, inclusive and sustainable economy, being creative,
imaginative and linking opportunities to enhance the benefits for
Renfrewshire. McGowan Environmental Engineering Ltd has
committed to deliver Community Benefits as set out within 3.12 of
this report. 
 Green- Protecting and enhancing nature in Renfrewshire and
encouraging equal access to opportunities to enjoy nature across
all people and communities.

Page 5

4. Legal- The Procurement of this Contract was conducted as a below
Regulated (Works) Open Procedure in accordance with the Council’s
Standing Orders Relating to Contracts.  
 
5. Property/Assets- The contract will facilitate Peatland Restoration
works at west of Tandlemuir farm, Clyde Muirshiel Regional Park,
Lochwinnoch. 
6. Information Technology - None directly arising from this report. 
7. Equality & Human Rights- The recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If required
following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website. 
8. Health & Safety – McGowan Environmental Engineering Ltd health
and safety credentials were evaluated by Corporate Health and Safety
and met the Council’s minimum requirements regarding health and
safety.
9. Procurement - The procurement procedure outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency, and modern Government. The
contract will only be awarded on confirmation of the Peatland Action
grant funding from NatureScot.
10. Risk – McGowan Environmental Engineering Ltd insurances have
been assessed and evaluated to confirm that they meet the minimum
requirement regarding insurance risk.
11. Privacy Impact - None directly arising from this report.  
12. Cosla Policy Position – None directly arising from this report.

Page 6

13. Climate Risk – The level of impact associated with provision of these
works has been assessed using the Scottish Government Sustainability
Test and it is considered a Low Risk. Energy will be consumed while
carrying out this work through the use of vehicles and machines on site.
Until they are restored, peatland can be a significant emitter of carbon
and once restored, are one of the most effective ways of locking in
carbon, offering a clear nature-based solution to the climate crisis.
 Carbon Energy Consumption – The contractor is required to
consider energy saving measures where possible, as part of the
peatland restoration works.
 Waste Production – None directly arising from this report.  
_________________________________________________________
List of Background Papers 
(a)  Clyde Peatlands – Update, Planning and Climate Change Board, 7
November 2023 
___________________________________________________________________ 
Author:            Abimbola Olutola, Procurement Advisor, Corporate Procurement Unit,
Abimbola.olutola@renfrewshire.gov.uk