Democracy Spraffa

Agenda Document Pack - Integration Joint Board - 25/09/2025

North Ayrshire Council · 25 September 2025
Back to Integration Joint Board — 25 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Integration Joint Board
Meeting
Thursday, 25 September 2025 at 10:00
Council Chambers, Cunninghame House, Irvine /
Hybrid via Microsoft Teams
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with provision,
by prior notification, for remote attendance by Elected Members in accordance
with the provisions of the Local Government (Scotland) Act 2003.  Where
possible, the meeting will be live-streamed and available to view at
https://north-ayrshire.public-i.tv/core/portal/home. 
1 Apologies
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in respect
of items of business on the Agenda.
3 Minutes
The accuracy of the Minutes of the meeting held on 21 August 2025 will be
confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973 (copy enclosed).
4 Director’s Report
Submit report by Caroline Cameron, Director (NAHSCP), on developments
within the North Ayrshire Health and Social Care Partnership (copy enclosed).
5 Primary Care Update
Submit report by Debbie McGill, Head of Primary and Urgent Care Services, on
the provision of Primary Care Services across Ayrshire and Arran (copy
enclosed).
6 Primary Urgent Care Update
Submit report by Debbie McGill, Head of Primary and Urgent Care
Services, provision of primary urgent care services delivered through the
Ayrshire Urgent Care Service (AUCS) (copy enclosed).
1

Page 2

7 North Ayrshire HSCP & ADP Annual Performance Management Report –
2024/25 Alcohol and Drugs
Submit report by Peter McArthur, Alcohol and Drug Services on the annual
performance information in relation to the partnership’s Alcohol and Drug
services (copy enclosed).
8 North Ayrshire HSCP & ADP Medication Assisted Treatment - Annual
Report
Submit report by Peter McArthur, Alcohol and Drug Services on the North
Ayrshire HSCP & ADP Medication Assisted Treatment - Annual Report (copy
enclosed).
9 2024/25 Audited Annual Accounts
Submit report by Eleanor Currie, Chief Finance Officer, on the audited annual
accounts for 2024-25 and the report from External Audit (copy enclosed).
10 External Audit Report 2024/2025
Submit report by Audit Scotland on the External Audit Report 2024/2025 (copy
enclosed).
11 2025-26 – Month 4 Financial Performance
Submit report by Eleanor Currie, Chief Finance Officer, providing an overview of
the Integration Joint Board’s financial performance as at month 4 (July) (copy
enclosed).
12 IJB - Reserves Policy
Submit report by Eleanor Currie, Chief Finance Officer, on the IJB Reserves
Policy following review (copy enclosed).
13 Financial Inclusion Strategy 2025-30
Submit report by Annie Johnson, Principal Manager, on the Financial Inclusion
Strategy 2023-28 (copy enclosed).
14 Chief Social Work Officer Annual Report 24/25
Submit report by Scott Hunter, Chief Social Work Officer (NAHSCP) on the
annual Chief Social Work Officer (copy enclosed).
15 Urgent Items
Any other items which the Chair considers to be urgent.
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the Council's
internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the start
of the meeting, the Provost/Chair will confirm if all or part of the meeting is being
filmed/recorded/live-streamed.
2

Page 3

You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited to, for
the purpose of keeping historical records and making those records available via
the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you acknowledge
that you may be filmed and that any information pertaining to you contained in
the video and oral recording of the meeting will be used for webcasting or training
purposes and for the purpose of keeping historical records and making those
records available to the public. In making this use of your information the Council
is processing data which is necessary for the performance of a task carried out
in the public interest.
If you have any queries regarding this and, in particular, if you believe that use
and/or storage of any particular information would cause, or be likely to cause,
substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
3

Page 4

IJB Sederunt
Voting Members
Joyce White (Chair) NHS Ayrshire & Arran
Cllr Chloe Robertson (Vice-
Chair)
North Ayrshire Council
Cllr Tom Marshall North Ayrshire Council
Cllr Anthea Dickson North Ayrshire Council
Cllr Nairn Angus-McDonald North Ayrshire Council
Linda Semple NHS Ayrshire & Arran
Tom Hopkins NHS Ayrshire & Arran
Marc Mazzucco NHS Ayrshire & Arran
Professional Advisors
Caroline Cameron Director
Eleanor Currie Interim Chief Finance Officer
Aileen Craig IJB Monitoring Officer
Iain Jamieson Clinical Director
Scott Hunter Chief Social Work Officer – North
Ayrshire
Thelma Bowers Mental Health Adviser
Darren Fullarton Associate Nurse Director/
Lead Nurse
Vacany Acute Services Representative
Dr Louise Wilson GP Representative
Sharon Hackney Lead Allied Health Professional
Lisa Davidson Public Health Representative
Wendy Van Riet Director of Psychological Services
Stakeholder Representatives
Lorna Sim Staff Rep - NHS Ayrshire and Arran
Lynda MacFarlane Staff Rep
Paul Smith Carers Representative
Clive Shephard Service User Representative
Vacancy Independent Sector Representative
Vicki Yuill Third Sector Representative
4

Page 5

North Ayrshire Health and Social Care Partnership
Minute of Integration Joint Board meeting held on 
Thursday 21 August 2025 at 10.00 a.m. 
involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation) 
Voting Members
Joyce White, NHS Ayrshire and Arran (Chair)
Councillor Chloe Robertson, North Ayrshire Council (Vice-Chair) (Chair) 
Councillor Nairn Angus- McDonald, North Ayrshire Council
Councillor Anthea Dickson, North Ayrshire Council 
Councillor Tom Marshall, North Ayrshire Council 
Professional Advisers
Caroline Cameron, Director of Health and Social Care Partnership
Thelma Bowers, Head of Service (Mental Health) (NAHSCP)
Eleanor Currie, Interim Section 95 Officer
Darren Fullarton, Associate Nurse Director/ Lead Nurse 
Present (Remote Participation) 
Voting Members
Marc Mazzucco, NHS Ayrshire and Arran 
Professional Advisers
Sharon Hackney, Lead Allied Health Professional
Iain Jamieson, Clinical Director 
Stakeholder Representative
Paul Smith, Carer Representative
Vicky Yuill, Third Sector Representative 
In Attendance (Physical Participation) 
Elizabeth Stewart, Head of Service (Children, Families & Criminal Justice)
Kerry Logan, Head of Service (Health and Community Care)
Loretta Galloway, Unity Enterprise
Alisa Weir, Senior Manager (Montrose House)
Karen Andrews, Team Manager (Governance)
Annie Johnston, Principal Manager (Business Support)
Raymond Lynch, Senior Manager (Legal Services)
Ruth Wilson, Team Leader (Litigation)
Hayley Young, Senior Committee Services Officer
Claudia Cheung, Digital, Media and Marketing Analyst 
Agenda Item 3
5

Page 6

Apologies 
Linda Semple, NHS Ayrshire and Arran
Lynne McNiven, Public Health Representative
Lorna Sim, Staff Representative NHS Ayrshire and Arran 
Tom Hopkins, NHS Ayrshire and Arran
Scott Hunter, Chief Social Work Officer 
Aileen Craig, IJB Monitoring Officer 
1. Apologies for Absence and Chair Remarks 
Apologies for Absence were noted. 
The Chair welcomed Councillor Chloe Robertson as the new Vice-Chair of the
Integration Joint Board and thanked Councillor Margaret Johnson for her valuable
contributions to the work of the IJB. 
2. Declarations of Interest 
There were no declarations of interest in terms of Standing Order 7.2 and Section 5.14
of the Code of Conduct for Members of Devolved Public Bodies. 
3. Minutes 
The accuracy of the Minutes of the meeting held on 1 May 2025 were confirmed and
the Minutes signed in accordance with Paragraph 7(10 of Schedule 7 of the Local
Government (Scotland) Act 1973. 
4. Director’s Report 
Submitted report by Caroline Cameron, Director (NAHSCP) on the developments
within the North Ayrshire Health and Social Care Partnership. 
Officers responded to members’ questions on various aspects of the report. 
Noted. 
5. 2025-26 – Month 3 Financial Performance 
Submitted report by Eleanor Currie, Interim Chief Financial Officer (HSCP) on the
Integration Joint Board’s financial performance as at Month 3 (June).  Appendix A to
the report detailed the financial overview of the Partnership position, while Appendix B
provided an overview of those service changed which did not have financial savings
attached and the BRAG status around the deliverability of each saving.  Appendix C
highlighted the movement in the budget position following the initial approved budget,
with further detail on the reserves set out at Appendix D.  The proposed recovery
action was outlined in Appendix E, while Appendix F highlighted information on the
costs of bank and agency staff. 
Officers responded to members’ questions on various aspects of the report. 
The Board agreed to (a) note the overall integrated financial performance report for
the financial year 2025-26 and the current overall projected yearend overspend of
£5.187m reducing to £1.175m after planned recovery actions; (b) note the progress
with delivery of agreed savings; (c) approve the actions which are being taken to
6

Page 7

progress financial recovery and that an updated recovery plan will be presented to the
next IJB; and (d) note the remaining financial risks for 2025-26;   
6. Montrose House Care Home - Arran 
Submitted report by Kerry Logan, Head of Service (Health & Community Care) on the
outcome of the recent options appraisal for Montrose House, as a follow up to the
report presented to the IJB in June 2025.  The report details the outcome of the recent
options appraisal for Montrose House, engagement feedback from over the summer
period and the recommended option to IJB to provide a sustainable model for
residential and nursing care that supports older people living on the island of Arran
within the available financial resource. 
The report asked support of the IJB to adopt and implement a revised service delivery
model, with the full Options Appraisal set out at Appendix 1 to the report. This would
see permanent bed numbers in Montrose House reduce from 15 to 10, while protecting
existing respite provision and re-introducing flexible day care opportunities. The model
would operate within the existing contracted staffing establishment, with a focus on
reducing agency dependency and improving service sustainability. This option also
aligns with the broader strategic aim of enhancing community-based care and
supporting carers through increased respite availability and day care opportunities.  And
to support the implementation of an admissions policy to prioritise access for Arran
residents with close familial and community ties on the isle of Arran, that would be
developed taking cognisance of legal advice from North Ayrshire Council. 
Officers responded to members’ questions on various aspects of the report. 
Members also queried the comparator costs of a care home bed in Montrose House of
£107,982 vs average cost other care home placements of £30,579.  Clarification was
provided that the values reflect the net cost to the HSCP of each type of placement: 
• £107,982 Montrose House – cost in 24/25 for 15 beds per bed based on actual
costs net of resident charges
• £30,579 other care homes  - all other care home placements are through
independent or third sector care home providers - for local authority placements
in older peoples care homes we pay a set national care home contract rate 
It was highlighted that every resident a local authority places into a residential or
nursing care home contributes towards the financial cost of their placement, this was
means tested and follows national guidance.  For individuals with higher levels of
income and savings the HSCP only fund the free personal care element of care.  The
costs above for both placements are an average of the net for all placements, ie. for
Montrose House an average based on 15 residents and for mainland placements the
average of over 700 individual placements.  The comparator was included as the
average cost of an alternative mainland placement as an alternative to Montrose
House is currently £30,579. 
Joyce White, seconded by Councillor Robertson, moved the approval of the 
recommendations set out in the officer’s report. 
As an amendment Councillor Angus-McDonald, seconded by Vicki Yuill, proposed the
following: 
The IJB notes:
7

Page 8

• The overwhelming rejection of the Montrose House proposals by the people
most affected: 97% of Arran residents and 61% of staff opposed the plans in
consultation.
Our statutory duties under:
• The Islands (Scotland) Act 2018, including the requirement to conduct an Island
Communities Impact Assessment (ICIA) before decisions that may significantly
affect an island community. It is clear that this proposal, if implemented, would
negatively impact island residents by reducing local access to care, increasing
travel and time to care, and undermining resilience during winter disruption. 
• The European Convention on Human Rights (particularly Article 8, right to
respect for private and family life, and Article 14, non-discrimination). 
• The Equality Act 2010 (Public Sector Equality Duty) and the Fairer Scotland
Duty, which require us to consider impacts on protected groups and those
experiencing socio-economic disadvantage. Early analysis indicates that older
people, disabled residents, and lower-income families would be
disproportionately and negatively affected by the proposal. 
• The Public Bodies (Joint Working) (Scotland) Act 2014, which requires the IJB to
plan services in partnership with communities and deliver services in a way that
improves outcomes.
The IJB therefore resolves: 
That no implementation of the Montrose House proposals will proceed until:
• A full paper is brought to North Ayrshire Council, requesting that they fund the
identified shortfall in recognition of the unique statutory duties and additional
costs arising from Arran’s Island status; and 
• A focus group of Arran residents and stakeholders is formally established, as
previously promised, to examine and co-design alternative models of care
provision that meet the island’s specific needs. 
On a point of order, Councillor Dickson asked and received clarification on whether the
Partnership could request that Council fund the identified shortfall, when not at the end
of the financial year. 
The Chair agreed that the meeting be adjourned at 11.45 a.m. for a short comfort
break to consider the amendment, reconvening at 11.55 a.m. with the same Members
and officers present and in attendance with the exception of Sharon Hackney. 
There followed debate and summing up. 
On a division and roll call vote, there voted for the amendment, Councillors Angus-
McDonald and Marshall (2) and for the motion, Councillors Robertson, Dickson, Joyce
White and Marc Mazzucco (4) and the motion was declared carried. 
Accordingly, the Board agreed as follows: 
To (a) approve the outcome of the Montrose House options appraisal and the
recommended option for future delivery in Montrose House of 10 permanent beds and
8

Page 9

1 respite bed; (b) approve the recommended model of day care delivery for older
people on the island of Arran; (c) support the principle of and development of an
admissions Policy for Montrose House to prioritise care for the residents of Arran and
provide a robust admissions criteria; (d) note the further work undertaken over the
summer period to engage and seek feedback on the proposed changes, the outputs of
this engagement are shared within the report and options appraisal; and (e) agree to
declare the remainder of the Montrose House building as surplus to North Ayrshire
Council and work with NAC colleagues to identify alternative uses which complement
the care home facility. 
Councillor Marshall and Marc Mazzucco left the meeting at this point. 
7. Transformation Plan – Progress Update 
Submitted report by Caroline Cameron, Director (NAHSCP) on the progress of the
HSCP transformation plan.  Six-month progress updates were provided to IJB in
September 2024, December 2024 and a further update on Q3 at the meeting on 6th
February 2025, with updated now every six months. 
Officers responded to members’ questions on various aspects of the report. 
Noted. 
8. North Ayrshire HSCP Clinical and Care Governance Report 2024-25 
Submitted report by Darren Fullarton, Associate Nurse Director/ Lead Nurse, NHS
Ayrshire and Arran on the HSCP Clinical and Care Governance Report 2024-25.  The
report provided an update and overview of governance activity for the period August
2024 – July 2025 and was set out at Appendix 1 to the report. 
Officers responded to members’ questions on various aspects of the report. 
Noted. 
9. Annual Performance Report 2024-25 
Submitted report by Caroline Cameron, Director (NAHSCP) on the key achievements
during 2024-25 and the publication of the Partnership’s Annual Performance Report,
set out at Appendix 1 to the report.   
Officers responded to members’ questions on various aspects of the report. 
Noted. 
10. NHS Ayrshire and Arran Delivery Plan 2025-2026 
Submitted,  for information NHS Ayrshire and Arran Delivery Plan 2025-2026. 
Noted. 
11. Strategic Planning Group Meeting Minutes 
Submitted, for information the minutes in relation to the Strategic Planning Group
Meeting on 12 March 2025. 
9

Page 10

Noted. 
The meeting ended at 12.40 pm. 
The full meeting proceedings can be viewed at 
https://north-ayrshire.public-i.tv/core/portal/home
10

Page 11

Integration Joint Board
25th September 2025
Subject : Director’s Report 
Purpose : This report is for awareness to advise members of North
Ayrshire Integration Joint Board (IJB) of developments within
North Ayrshire Health and Social Care Partnership (NAHSCP) 
Recommendation : IJB members are asked to note progress made to date. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
IJB Integration Joint Board
HSCP Health and Social Care Partnership
LS/CMI Comprehensive general offending assessment and case
management planning method.
CMI 
HMIPS HM Inspectorate of Prisons for Scotland 
1. EXECUTIVE SUMMARY 
1.1 This report informs members of the Integration Joint Board (IJB) of the work
undertaken within North Ayrshire Health and Social Care Partnership (NAHSCP),
nationally, locally and Ayrshire wide. 
2. BACKGROUND 
2.1 This report provides IJB with up to date information on recent activity across the HSCP
since the last IJB.    The report will also provide COVID related information by
exception. 
Agenda Item 4
11

Page 12

3. CURRENT POSITION 
National Developments 
3.1 Palliative Care Matters for All : Palliative Care Strategy (2025-30) 
Scottish Government’s palliative care strategy has been recently published, this
highlights the changes needed to improve experiences of people of all ages with life
shortening conditions and their families and carers. 
Palliative Care Strategy 2025 – 2030
Palliative Care Delivery Plan 2025 – 2028 - Scottish Government 
The delivery plan includes 23 actions grouped into six action groups:
1: Enabling Communities 
2: Delivering Palliative Care 
3: Future Care Planning in Palliative Care 
4. Education and Learning in Palliative Care
5. Palliative Care Data and Experiences
6: Governance and Reporting for Palliative Care 
Integration Authorities and Health Boards are noted as delivery partners under all
actions. A more detailed breakdown of action points relevant to IJBs is also included. 
The HSCP will undertake a self-assessment against the actions to ensure our services
are aligned with the priorities in the strategy and delivery plan. 
3.2 Prison Based Social Work Review : Phase 2 
Care Inspectorate and HMCIP have notified of their intention to undertake Phase 2 of
the review of prison-based social work services in Scotland. This review is being
carried out under Sections 53 and 115 of the Public Service Reform (Scotland) Act
2010. The work will commence in August 2025 and concludes in April 2026. 
A Thematic Review of Prison-Based Social Work (2024) was undertaken in
partnership by the Care Inspectorate and HM Inspectorate of Prisons for Scotland
(HMIPS). Phase 2 will therefore also be undertaken in collaboration with HMIPS. 
Within the Thematic Review of Prison-Based Social Work a further phase of work with
a specific focus on the efficiency and effectiveness of prison-based social work
practice was agreed.   The focus of Phase 2 will therefore be on the execution and
results of prison-based social work practice and linked SPS processes in relation to
the use of LS/CMI.   
The LS/CMI is a comprehensive general offending assessment and case
management planning method. It is used by all community and prison-based justice
social work services in Scotland to aid decisions on the level and focus of intervention
with people (aged 16+) who have been involved in offending.
12

Page 13

3.3 Online Tool to Support Young People with Additional Support Needs through
Transitions 
Compass is free online tool offering support to young people with additional support
needs – and the adults in their lives – throughout the transition to adulthood. 
With separate versions for young people, parents/carers and professionals, this
interactive digital platform contains up-to-date information and advice, all in one place,
and is accessible at any time.   
Compass is tailored to the individual, so it’s always relevant and specific, saving time
and reducing stress. It helps young people explore what matters to them and allows
them to share their thoughts, as well as giving parents and carers an individual
transitions timeline and highlighting key actions at each stage. 
Additionally, it can guide professionals through the statutory duties that apply to
transitions and supports a joined-up approach. 
Compass was developed by ARC Scotland, working with young people and their
families. To find out more, or to sign up, visit the Compass website.   
If you require any additional information, please contact
Dominic.Jarrett@aapct.scot.nhs.uk or fionadalziel@north-ayrshire.gov.uk. 
Ayrshire Wide Developments 
3.4 Innovation in Health and Social Care Eent 
The next Ayrshire Innovation in Health and Social Care event, sharing support and
experiences of innovation from health and social care across Ayrshire and nationally
is taking place on 30th September 2025.
Registrations for the next event on Tuesday 30 September are now open and based
on previous feedback, will be a slightly smaller agenda to allow more time for
questions. Speakers include :
• David McColl, Deputy Director of Technology Services, NHS Education for
Scotland, giving an update on the National Digital Front Door Project.
• Julia McMurdie and Muhammad Shakir from the Ayrshire 5G Innovation
Region, speaking about exciting plans for the health and social care sector.
• Paula Baird from NHS Education for Scotland, speaking about their Digital and
Data Capability Framework and self-assessment tool.
• Thomas Griffin from South Ayrshire HSCP, who will present on their
Technology Enabled Care Plan.
• Kristin Carpenter from North Ayrshire HSCP, who will speak about the results
of the network survey and plans for the future. 
13

Page 14

3.5 NHS Ayrshire & Arran Quality Strategy 
On Tuesday 7 October, NHS Ayrshire & Arran is hosting a collaborative event at
CentreStage, Kilmarnock, bringing together staff, students, volunteers and people
with lived experience to help shape the next NHS Ayrshire & Arran Quality Strategy.
It’s a chance to contribute, listen and collaborate in a meaningful way, to ensure that
the next NHS Ayrshire & Arran Quality Strategy reflects the experiences, values and
priorities of our patients and communities. 
• Get involved in the discussion
• Share your ideas
• Identify opportunities for change
• Tell us what matters to you 
For more information on the event, or to register online, visit the NHS A&A website. 
North Ayrshire Developments 
3.6 Shout for Support with Mental Health & Wellbeing 
North Ayrshire Council and NAHSCP have launched free, in the moment mental
health support via text message thanks to a new partnership with Shout.  This text-
based service offers tailored support to people of all ages in North Ayrshire whenever
they need it. 
To access the service, residents can text SUPPORTNA to 85258 to be connected
there and then to a trained Shout volunteer.  The service can provide confidential
support with: 
• Anxiety and stress
• Depression and sadness
• Suicidal thoughts and self-harm
• Panic attacks
• Loneliness and isolation
• Bullying and abuse 
Shout volunteers are on hand to help 24 hours a day, seven days a week, when things
get tough or if you are feeling overwhelmed or need support. 
14

Page 15

3.7 Learning Disability Awareness Week / Launch of LD Service Learning Plan 
The Learning Disability Awareness Week in September saw a host of events taking
place nationally to celebrate this annual awareness raising campaign. 
Trindlemoss Day Opportunities in Irvine joined in the celebrations, with activities which
include the popular TM Fest, as well as drop-in sessions with local visual artist Lynn
McNally and Poet Simon Lamb. 
The theme for Learning Disability Week
this year was ‘I Am Here’ - a theme
chosen by people with learning
disabilities themselves, demonstrating
their continuing experience of often
feeling excluded from jobs, healthcare,
social events and culture.
Much of the work undertaken by our
North Ayrshire Learning Disability
Service reflects this continuing
experience of exclusion within
communities, but it is evident that
progress remains to be made. With this in mind, the LD Service has launched its new
learning plan, which sets out the need for new thinking and practice to address long
standing issues of exclusion, and the need for service users, carers, and other
stakeholders to be meaningfully and consistently involved in generating those new
ideas. 
The plan is made up of two documents – What Makes a Good Life and Living and
Learning Together – which you can find on the NAHSCP website. 
A range of activities will take place in the months ahead as part of this ambition. If you
would like to be involved in this, or would like to learn more about the LD Service's
hopes for this process, please contact Dominic Jarrett (Learning Disabilities
Development Manager) by emailing dominic.jarrett@aapct.scot.nhs.uk
3.8 Moving and Handling Information Sessions for Carers and Families 
Safety is paramount when caring for someone who requires the use of moving and
handling equipment, so we’re offering families and carers the opportunity to attend a
free Moving and Handling information session at Castleview Hub in Ardrossan on one
of the following dates, with separate sessions running in the morning (9.30am to
12.30pm) and afternoon (1.30pm to 4.30pm).
• Monday 29 September
• Wednesday 22 October
• Monday 17 November
• Tuesday 9 December
15

Page 16

These sessions will cover the use of profiling beds, hoists and slings, slide sheets,
commode chairs and more. Staff within the facility are trained in line with the Scottish
Manual Handling Passport.
Carers can book a place on one of these sessions by calling 07385 399 746 and
leaving a message with their name, preferred date, and whether they want to attend
the morning or afternoon session.
Please note that there are 10 places available for each session, which will be allocated
on a first come, first served basis. 
3.9 Care at Home – Inspection 
Our Three Towns, North Coast and Arran Care at Home Service has received a very
positive report from the Care Inspectorate after an unannounced inspection in August.
The service, which supports almost 800 residents to live independently in their own
homes, was rated ‘very good’ in terms of how well it supports people’s wellbeing, its
leadership and staff team, with a number of significant strengths identified. It also
received a rating of ‘good’ for its care and support planning.
Inspectors spoke to 39 service users and 129 staff members, observed practice, and
reviewed documents including care plans as part of the evaluation.
The very positive inspection outcome reflects the continued high quality of care
delivered by our skilled care at home staff and managers, congratulations to the whole
team. 
If you’d like to read more, the inspection report can be downloaded from the Care
Inspectorate website.
3.1- Overdose Awareness Day 
MINDS of Recovery and Cafe Solace hosted a deeply moving event to mark
International Overdose Awareness Day on 29th August 2025.  Recovery
organisations, community members, and those affected by substance use came
together to reflect, remember, and honour the lives lost. 
The day was filled with compassion
and connection, with support from
organisations including Children
1st, KA Leisure, Turning Point
Scotland PEAR service, Police
Scotland, Broken Chains, Cocaine
Anonymous and Harbour Ayrshire.
Guests were warmly welcomed
with catering and refreshments
provided by Cafe Solace in Irvine.
16

Page 17

The event also included a flower float ceremony at the Low Green in Irvine, offering a
peaceful and symbolic moment of remembrance for those no longer with us.
3.11 First Digital Community Alarm Connection 
The Community Alarm team has completed
its very first digital connection. 
Mrs Wilson from Irvine was delighted to be
the first in North Ayrshire to have her alarm
successfully upgraded to use digital
communication, which connects directly to
our monitoring centre. 
Moving to digital connectivity means even
greater reliability and reassurance, helping us
keep our service users safe at all times.
Our community alarm team is already well under way with the reprogramming of
alarms across our localities ahead of the switching off of analogue telephone lines in
the UK in early 2027.
3.12 North Ayrshire Premiere of The Low Road 
Staff and partners attended t the North Ayrshire premiere screening of The Low Road
on 9th September 2025 in the Harbour Arts Centre, Irvine.   
This film was developed by authentic voices of lived experience and is filled with hope
and inspiration. As well as challenging stigma and raising awareness, the film can also
be used as a tool in suicide prevention activities across communities.
The screening event was followed with a Q & A with the film makers and coordinating
staff within mental health services to explore how we might utilise this resource in our
suicide prevention work across North Ayrshire services in the future. 
3.13 Gambling Awareness / Gambling Harms in Children and Young People Workshop 
Arran Community and Voluntary Service, working in partnership with Ygam hosted a
‘gambling awareness and gambling harms in children and young people’ workshop on
Tuesday 2nd September in Saltcoats Town Hall.
This was attended by third sector and statutory services working with people under 25
and families in North Ayrshire.  Participants will receive a City & Guilds Certificate and
digital accreditation, and will also gain access to digital resources to support them
within their role.  
17

Page 18

Topics covered on the day included :
• Why children and young people may game and/or gamble
• Risk and associated harms
• The influence of advertising, products, social media, in game purchases and
digital convergence
• The young brain: decision making, addiction and motivation
• Barriers to seeking support
• How to spot the signs of harm
• How you can support the children and families you work with
• Conversations, screening, planning, follow-ups and signposting 
3.14 Call for Evidence – Health, Social Care & Sport Committee 
The HSCP have been invited to give evidence to the Health, Social Care and Sport
Committee’s Attention Deficit and Hyperactivity Disorder (ADHD) and Autism
Spectrum Disorder (ASD) Pathways and Support Inquiry. 
The inquiry seeks to: 
• understand why waiting times for diagnosis and management of ADHD and
ASD are reportedly long, including the drivers of increasing demand 
• understand how these conditions are diagnosed and managed 
• understand the impact of delays on individuals 
• explore solutions to improve capacity of services, referral pathways and
support 
The inquiry will consider the following in relation to neurodevelopmental pathways
for ADHD and ASD: 
• referral pathways 
• assessment, criteria and treatment thresholds 
• waiting times 
• "waiting well" and support pre-diagnosis 
• transitions between services 
• funding 
• workforce 
• the impact on individuals of receiving a diagnosis or waiting for a diagnosis 
Thelma Bowers, Head of Mental Health & Learning Disability will attend to provide
evidence to the Committee on 7th October 2025. 
18

Page 19

4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None 
4.5 Risk
None
4.6 Community Wealth Building
None
4.7 Key Priorities
None
5. CONSULTATION 
No specific consultation was required for this report. User and public involvement is
key for the partnership and all significant proposals will be subject to an appropriate
level of Consultation. 
Caroline Cameron, Director
[Carolinecameron@north-ayrshire.gov.uk/01294 317723] 
Appendices
Nil
19

Page 20

20

Page 21

Integration Joint Board
25 September 2025
Subject : Primary Care Update
Purpose : This report is presented as the annual update to the Integration
Joint Board (IJB) on the provision of Primary Care Services across
Ayrshire and Arran. 
Recommendation : IJB members are asked to: 
a) Note the current position of Primary Care Services including
within General Practice through the General Medical
Services (GMS), Community Optometry, Community
Pharmacy, General Dental Services and Public Dental
Services.
b) Note the areas of development work being undertaken
across all Independent Contractor groups and progress of
implementation of the  Primary Care Phased Investment
Programme Demonstrator Site in line with the  2018 GMS
contract 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
AUCS Ayrshire Urgent Care Service
BMA British Medical Association
CPAA Community Pharmacy Ayrshire and Arran
CTAC Community Treatment and Care
EDS Emergency Dental Service
EMG Expert Medical Generalist
GDS General Dental Service
GMS General Medical Services
GOS General Ophthalmic Services
GP General Practice / Practitioner
HCSW Healthcare Support Worker
HIS Healthcare Improvement Scotland
HSCP Health and Social Care Partnership
IJB Integration Joint Board
MDT Multi-disciplinary team
MHP Mental Health Practitioner
MoU Memorandum of Understanding
Agenda Item 5
21

Page 22

MSK Musculoskeletal
OOH Out of Hours
PDS Public Dental Service
PLT Protected Learning Time
PCIF Primary Care Improvement Fund
PCIP Primary Care Improvement Plan
PCPIP Primary Care Phased Investment Programme
TOC Test of Change
WTE Whole Time Equivalent   
1. EXECUTIVE SUMMARY 
1.1 General Practices continue to face challenges with increased patient demand and
financial pressures.  Previous analysis indicates that patients are continuing to present
to General Practice with more advanced health concerns than they would have pre-
pandemic. This in part can be attributed to this cohort of patients having more complex
conditions and being managed longer by their GP whilst awaiting appointments in
other parts of the system.  Many of these patients require an extended (sometimes
double) appointment time and clinicians may need to do a greater degree of follow up
with the patient which again increases workload and reduces appointment capacity. 
1.2  Many GP Practices are facing increasing challenges to accommodate the additional
staff aligned to them through the Primary Care Improvement Plan (PCIP).  Many
buildings across the GP Practice estate are also needing significant investment or
alternative accommodation identified for longer term viability. 
1.3  Progress continues to be made implementing the 2018 GMS contract which provides
the basis for an integrated health and care model with a number of additional services
and multi-disciplinary teams (MDTs) including nurses, pharmacists, mental health
practitioners, Musculoskeletal (MSK) physiotherapists, and community link workers.
This includes signposting, where appropriate, to other primary professionals within the
community. 
1.4 Community Pharmacies continue to provide a fully comprehensive service as a first
point of contact for the public, as an alternative to attending a GP, through the NHS
Pharmacy First Scotland scheme which has been enhanced locally in some areas to
deliver the Pharmacy First Plus Scheme due to an increase in the number of
Pharmacies having Independent Prescribing Pharmacists.   
1.5 Various areas of development work has been undertaken within Community
Optometry to increase access to specialist care and treatment in the community,
reducing the need for patients to attend secondary care services for some conditions. 
22

Page 23

1.6 A programme of work to reset the vision for dental services across Ayrshire continues.
Work is being undertaken to understand the population need, current status of all
services within dental and determine what a future delivery model for dental services,
could look like. 
1.7 This report has been presented to:
i. East Ayrshire IJB – 27 August 2025
ii. South Ayrshire IJB – 8 October 2025 
This report will also be presented to:
iii. NHS Ayrshire & Arran Board – 8 December 2025 
2. BACKGROUND 
2.1 The Public Bodies (Joint Working) Scotland Act 2014 provides a legislative framework
for the delivery of Primary Care Services in Scotland. East Ayrshire HSCP, through
Lead HSCP arrangements, are responsible for the delivery of Primary Care Services
across Ayrshire and Arran.  In addition NHS Ayrshire & Arran directly commission East
Ayrshire HSCP to conduct Primary Care Contracting on behalf of the Board, this being
a function that cannot be delegated to IJBs at this time.   
2.2 The 2018 GMS contract was introduced to facilitate a refocusing of the GP role as
Expert Medical Generalist (EMG).  The contract is a joint agreement between the
Scottish Government and the British Medical Association (BMA) which sets out to: 
• Provide a new direction for general practice in Scotland which aims to
improve access for patients, address health inequalities and improve
population health including mental health 
• Provide financial stability for GPs, and reduce GP workload through the
expansion of the primary care multidisciplinary team
• Redefine the role of the GP as an expert medical generalist focusing on
complex care, reduce the risks associated with becoming a GP partner and
encourage new entrants to the profession as well as help retain existing
GPs
• Provide new arrangements for GP premises, GP information technology
and information sharing. The effect of these arrangements will be a
substantial reduction in risk for GP partners in Scotland, and a substantial
increase in practice sustainability. Which is critical to ensure service
delivery. 
2.3 The first Primary Care Improvement Plan (PCIP) (2018-2021) set out to implement
the new contract across NHS Ayrshire & Arran by 2021.  The PCIP 2 (2020-22) was
approved at each of the IJBs, NHS Board and Local Medical Committee in December
2019.  In 2022 Scottish Government advised that there would be greater focus on the
delivery of Pharmacotherapy, CTAC and Vaccinations following agreement with the
BMA that these would be the contractual elements of the 2018 contract.  This then
became the priority across Ayrshire and Arran.
23

Page 24

2.4 Since April 2024, the Ayrshire and Arran Primary Care Team, on behalf of the three
Health and Social Care Partnerships (HSCPs) have been leading on the Phased
Investment Programme Demonstrator site work with NHS Health Improvement
Scotland (HIS). This is to demonstrate what fuller implementation of the 2018 GMS
Contract would look like in General Practice, focussing on the contractual elements of
Community Treatment and Care (CTAC) and Pharmacotherapy. This is a nationally
funded 18 month programme delivered by the Primary Care Transformation team and
service leads with local governance arrangements in place. 
Throughout the programme, qualitative and quantitative data is being collected to
evaluate whether fuller implementation is achievable. 
2.5 NHS General Dental Services (GDS) is typically the first point of contact for NHS
dental treatment for patients within the community.  People register with a dentist in
order to receive the full range of NHS treatment available under GDS. 
2.6 The Public Dental Service (PDS) acts as both a specialised and safety-net service
providing care for individuals who are unable to obtain care through the GDS such as
those with special care needs or patients living in areas where there were few NHS
dentists providing GDS.   
2.7 Secondary care is a referral based service which supports referrals from medical and
dental practitioners.  For example, maxillofacial surgery which specialises in the
diagnosis and treatment of diseases affecting the mouth, jaws, face and neck.  Those
patients who are unable or not suited to be treated locally are referred to the General
Dental Hospital who not only specialise on oral health care but deliver education and
research in West and Central Scotland. 
3. OVERVIEW 
3.1 General Practice (GMS) 
Primary Care Services are more often than not a patient’s first point of contact with
NHS Ayrshire & Arran and it is estimated that around 90% of NHS contacts take place
within general practice. 
There are 53 GP practices across Ayrshire and Arran who all operate as separate
independent businesses in their own right, and are not directly employed by NHS
Ayrshire & Arran. Within Ayrshire and Arran there are currently no Health Board
managed practices (which would operate under a 2C contract). 
The core elements of a general medical services contract includes: 
• An agreed geographical or population area the practice will cover 
• A requirement that the practice maintain a list of patients for the area and
sets out who this list covers and under what circumstances a patient might
be removed from the list and the process to follow in the event.
24

Page 25

• The establishment of essential medical services a general practice must
provide to its patients 
• Key policies including indemnity, complaints, liability, insurance, clinical
governance and termination of the contract. 
Whilst every GP Practice delivers general medical services through their contract with
NHS Ayrshire & Arran, they have flexibility to deliver that in a manner that best suits
their patient population as well as business model. One size does not fit all and all
practices operate very differently in terms of clinics that operate on a daily basis, their
clinical workforce model, and also how appointments are triaged and allocated. All GP
Practices have to complete an annual contract review survey which is followed up with
visits to all by the NHS A&A Primary Care team to discuss the feedback around
contractual matters and improvement work. 
Review of Enhanced Services – Additional services for specific health care
needs beyond core GMS 
The programme of review for enhanced services (to determine whether they remain
fit for purpose) recommenced in May 2025, with cognisance that some are being
considered within the wider Caring for Ayrshire work. All enhanced services
appropriate for review have now been categorised as High / Medium / Low priority
level. The Local Medical Committee is supporting this work by commencing a group
to review the pathways and funding attributed to each enhanced service and will feed
their findings / recommendations into the Enhanced Services Review Programme
Board for consideration. The review will be completed by March 2026.  Any
amendments to the enhanced services pathway will be ratified by GP sub and
approved at Primary and Urgent Care Clinical Governance Group. 
GP Sustainability Payments 
NHS Ayrshire & Arran currently supports 11 GP Practices operating under 17C (GP-
run / locally negotiated contracted) arrangements. These practices receive
sustainability payments, low payment agreement contributions and specific and
standard enhanced services.  The nature and purpose of each type of payment is
dependent on the specific arrangement with the GP Practice but typically, relate to
delivery of services in remote locations or areas with specific demographic needs
meaning that GP practices require financial assistance to operate. 
Following an external audit in late 2024 of 17C Contractual arrangements and
subsequent recommendations, a review is being undertaken for all GP Practices with
a 17C Contract. This will include reviewing the governance, the amount of
sustainability payments these practices receive and also the practice specific
enhanced services provision which is provided over and above the levels provided
under GMS. 
25

Page 26

There is the potential for additional funding support being required if it is determined,
following review that the current level of payments does not meet the financial
sustainability of the practice and therefore puts the practice at risk of resigning from
their GMS Contract as the practice no longer becomes financially sustainable to
continue in its current form. 
GP Sustainability Loans (GPSL) 
Scottish Government confirmed that the process to complete Band 1 & 2 GPSL
transactions by end of financial year 2024/25 was successful and that all available
funds were disbursed before the deadline. Scottish Government have confirmed that
funds are available for each of financial years 2025/26 and 2026/27, in both instances
the available funds are capped. Scottish Government have asked that Boards proceed
with the negotiation of existing applications falling within all bands but must obtain
funding confirmation for each transaction before signing the relevant documentation.
This is necessary to allow Scottish Government to manage the cash flow within the
project each year. NHSAA have six GP Practices to be concluded within Tranche 1 at
a total value of £925,400 which are now guaranteed to be funded. Scottish
Government is not able to authorise any further tranche 1 applications at this stage.
Tranche 2 of the GP sustainability loans currently remains frozen. 
NHS Board Hosted Digital Telephony Platform 
Progress with this project had been slow due to delays from IT Security in approving
the cloud-based system, Fuse 2, to have access to Health Board telephony systems. 
Due to this, there has only been three GP practices who have transferred over onto
the Board current telephony platform to date. 
The Fuse2 3CX Cloud hosted solution was recently signed off by Cyber Security and
Information Governance which will now allow the digital telephony team to progress
at pace with implementing the roll out to the 15 practices who have agreed to transfer
over onto the health board telephony platform. Two of these Practices to be made a
priority for ordering and installation due to sustainability issues and concerns. 
The timeframe from order to installation is approximately two to four weeks which will
allow the programme to build momentum and the work to be completed for the
remaining practices during September 2025 to March 2026.   
Some of the remaining 38/53 Practices already use digital platforms and /or are tied
into lengthy contracts with their current telephony provider. Further engagement will
be undertaken with these 38 practices, to establish those on an analogue system for
prioritisation and explore all options which would allow transfer to the Board platform
for those wishing to do so.   
Due to the significant delays with this project, some practices may opt out of the Board
telephony platform and make their own arrangements with an alternative supplier. 
26

Page 27

This would have financial implications for the current model and potentially unmet
costs not being covered through the proposed income from practices. 
GP IT Re-provisioning 
Following the collapse of the parent company, In Practice Systems Limited (InPS),
involved in the IT Reprovisioning, a preferred new supplier has been identified and
work is progressing at a national level.  The hosted platform will remain as Vision and
the only change is to the supplier.  Locally, GP practices have been asked to submit
details about the quality and safety searches and templates that they use. The
information provided will then be used to create a suite of searches and templates that
can be used in Vision and are available to all practices in Ayrshire and Arran. 
GP Recruitment and Retention 
There are issues being faced nationally around the retention and the declining
availability of WTE GP workforce which is affecting all GP Practices across the
country.  These issues include workload pressures, recruitment and retention of
practice teams and financial viability as many GPs are expressing burnout and
uncertainty on whether to remain working in General Practice. GP vacancies within
NHS A&A have reduced significantly than in previous years. In 2024/25 we had 22
vacancies, in comparison to 2025/26 there are currently only three vacancies. 
Many GP Practices will be considering or have put succession plans in place. It is
therefore crucial that GP Practices are encouraged to become licenced sponsors
and/or participate in the GPwER (GP with Extended Role) scheme and at the same
time retain locally trained doctors, specifically the IMG (International Medical
Graduate) cohort. 
Previous GPwER recruitment efforts have proven that offering something unique sets
NHS Ayrshire & Arran apart from other Health Board areas and supports the future
sustainability of General Practices. 
Urgent Care Home Visit Test of Change 
In December 2023 a Home Visit Test of Change (ToC) within Ayrshire Urgent Care
Service (AUCS) was developed, in conjunction with the local GP Sub-Committee, to
support local GP practices with unscheduled afternoon requests for home visits
between the hours of 3pm and 6pm.  This was in recognition of the increased demand
in general practice (including increasing mental health presentations, increase in
patients with core morbidities and managing more patients for longer with complex
conditions whilst waiting on secondary care appointments).  This also causes an
impact on capacity and pressure on the workforce when faced with many conflicting
priority patients including those presenting late in the afternoon with an urgent care
need requiring a home visit. 
27

Page 28

To ensure safe delivery and the ability to cope with demand, the ToC has been rolled
out on a phased basis, through GP Clusters whilst closely monitoring and evaluating
delivery.  
At the end of June 2025, 51 practices across all three Ayrshire Health and Social Care
Partnerships were involved with the ToC with 43 of them using the service at least
once.  During 2024/25, 1020 patients have been seen by the GP to AUCS for Home
Visit Service with just 17% (173) of patients requiring admission. 
This model aligns to the urgent care principles set out within the 2018 contract as well
as the vision of creating a 24/7 seamless urgent care pathway with general practice
and AUCS working together. 
3.2 UPDATE ON 2018 GMS CONTRACT - PRIMARY CARE IMPROVEMENT PLAN 
Progress continues to be made implementing the 2018 GMS contract which provides
the basis for an integrated health and care model with a number of additional
professionals and services multi-disciplinary teams (MDTs) including nursing staff,
pharmacists, mental health practitioners, MSK physiotherapists, and community link
workers as well as signposting a number of patients, where appropriate, to other
primary healthcare professionals within the community. This is aligned to the NHS
Ayrshire & Arran Caring for Ayrshire vision to create a whole system health and care
model focussing on individuals, families and communities with general practice and
primary care providing accessible, continuing and co-ordinated care. 
NHS Ayrshire & Arran were one of four Scottish NHS Boards who were successful in
a bid during 2023 to be a Primary Care Phased Investment Programme (PCPIP)
demonstrator site to work with Scottish Government and NHS Healthcare
Improvement Scotland (HIS). The aim is to demonstrate what a model of full
implementation of the MDT (focussing on Community Treatment and Care (CTAC)
and Pharmacotherapy teams) can look like in General Practice and to build evidence
to understand the national context for full implementation and long-term Scottish
Government investment. 
Demonstrator sites have been supported to work at pace using improvement
methodologies to fully implement elements of the 2018 GMS Contract focussing on
the contractual elements of Pharmacotherapy and CTAC locally. It seeks to
understand the impact for people, the workforce and the healthcare system, with
reduction in GP and practice workload with the key aim being to improve patient
outcomes. 
The programme has been ongoing since April 2024 and is due to complete by the end
of December 2025.  NHS Ayrshire & Arran had a mature model of both the CTAC and
Pharmacotherapy service implementation prior to the programme, and is undertaking
the widest scope, scale and complexity of the four demonstrator sites. 
28

Page 29

There has been strong collaborative working throughout the programme between
Scottish Government, HIS and NHSAA, and internally within different services and
teams.  GP Practices have had multiple opportunities to be involved, for example, as
standing members of governance groups, or to participate in evaluations; also, to have
an understanding of the programme through regular PCPIP news bulletins.
The Key elements of the programme for NHS Ayrshire & Arran Pharmacotherapy are
to: 
• Expand the Pharmacy support worker role in delivery of the service
• Clearly define role of each member of the team – right person right task
• Expand Pharmacy hubs – skill mix and resilience
• Develop a supervision/ preceptorship programme to improve Pharmacists
confidence in clinical decision making and risk management
• Test & evaluate Advanced Pharmacist Practitioner role 
The Key elements of the programme for NHS Ayrshire & Arran CTAC are to: 
• Expand and further development the CTAC resilience model ensuring
sustainability of the CTAC service and ongoing support for General practice
during times of long-term absence or maternity leave. 
• Test an adapted skill mix for resilience to inform future workforce planning and
service delivery models
• Continue and further develop the Primary Care Practice Educator role across
the three HSCPs.
• Work in partnership with General Practice colleagues to undertake a further
audit of demand and activity
• Develop systems to capture reliable, ongoing data around CTAC activity at both
GP practice and HSCP level
• Engage with key stakeholders including local population to evaluate current
service and inform areas for improvement 
Pharmacotherapy and CTAC teams have been working hard over the past year to
implement the key elements of the programme locally which is supported by a robust
governance framework and programme management. Local Quality Improvement
colleagues have been supporting Pharmacotherapy and CTAC teams in the collection
of data for improvement for the key elements of the programme.   
Whilst the focus will be on these two services, all MoU Services will be considered in
the monitoring and evaluation of the demonstrator sites as part of a whole systems
approach to quality improvement. 
In 2024 NHSAA refreshed the detailed delivery framework to implement the 2018
GMS Contract.  There has been significant progress across each of the contract areas
with vaccinations already transferred and the majority of practices accessing the
additional roles described within the contract. 
29

Page 30

For each area of the programme there is delegated involvement, responsibility and
accountability from representatives across the three HSCPs, NHS Board, and GP Sub
Committee within Ayrshire and Arran. There are co-leadership arrangements with
MoU workstream Leads and local GP Sub Executive Members to oversee decision
making and progress through the current implementation structure. 
This is further strengthened with involvement from the Clinical Director and GP
Stakeholder from each of the HSCP areas who are well engaged with practice teams
and wider community teams on the ground. 
This group come together regularly as the GMS Contract Oversight Group with the
additional responsibility to oversee the Demonstrator Site work. 
General practice and wider community teams have been fully engaged in developing
service specifications aligned to the MoU.  We are confident with additional support
and focus we could demonstrate what full delivery could look like for a Board wide
area. 
Pharmacotherapy 
The pharmacotherapy service is provided to all GP practices across Ayrshire and
Arran and while full implementation of the Contract has not been achieved
developments to improve efficiencies in systems and processes will be reviewed to
ensure pharmacotherapy teams deliver the best possible service and add maximum
benefit to patients. The delivery model has continuously been refined adjusting the
ratio of pharmacists, pharmacy technicians, and the introduction of pharmacy support
workers. 
The skill mix has developed over time as the service continues to promote advanced
practice roles and ensuring that professionals are working to the top of their licence. 
New roles have recently been introduced to the team as part of the PCPIP programme
including Pharmacy Support Worker team leaders and Advanced Pharmacist
Practitioners. These new roles will be evaluated as part of the programme. 
Central hubs have expanded and are now covering all three Ayrshire HSCPs providing
some (but not all) resilience cover for the pharmacy technician workload. 
Polypharmacy reviews are an area of national and local focus and this along with
prescribing improvement activities are and will remain important aspects of service
delivery by pharmacy colleagues working in our general practice network. 
Learnings from the current PCPIP programme will inform the development of the
service. This as well as additional Quality Improvement support from HIS and local
quality improvement teams will support closer review of processes at scale. 
Variation across the service both in terms of skills and confidence of pharmacy teams
along with practice and processes in general practice continues to challenge.
30

Page 31

Standardisation of processes and development of staff will continue to be a priority for
the leadership team within Pharmacotherapy. 
Community Treatment and Care (CTAC) Nursing 
In line with the 2018 GMS contract, a CTAC model was developed and implemented
between 2020 and 2022.  Following extensive consultation there was an agreement
that the model would be practice based and seamless for patients accessing the
service. The workforce consisted of 90 WTE staff; 58 WTE Nurses and 32 WTE
HCSWs.  In addition, there are 3 WTE CTAC Team Leaders; one per HSCP to
manage the staff.  A total of 52 GP Practices have full access to CTAC services.  There
is also a hub model tried and tested in South Ayrshire HSCP which has supported
practices where accommodation within GP Practices has been challenging. 
In 2023, the model was further enhanced with the introduction of a staff resilience
model to provide cover for maternity and long-term absence to prevent workload
falling back to General Practice over a longer period of time.   In addition, a Practice
Educator role was tested to provide a robust education and supervision model whilst
implementing the service specification.   
The CTAC element of the PCPIP bid focussed on the continuation and expansion of
the resilience model with a focus on testing an adapted skill mix for resilience with a
2:1 ratio of HCSW to Nurses.  It is anticipated that this will inform future skill mix
requirements for the CTAC model which is based on a 2:1 ratio of Nurses to HCSW. 
The Practice Educators and resilience staff are currently in post until September 2025
in line with the PCPIP funding.  In addition, a further 12 HCSWs were recruited to
provide enhanced resilience cover.  The additional posts were recruited in December
and it is anticipated the full impact of the additional staff will be tested between April
and September 2025. 
A further week of care audit was undertaken in September 2024 which demonstrated
that CTAC staff were undertaking 85% of CTAC activities.  National week of care
audits were undertaken in each of the demonstrator sites in April and June 2025 with
a further planned for September 2025 which will inform next steps. 
Feedback was captured from stakeholders including a patient and carer survey which
was undertaken in six GP practices in April 2025.  Feedback was very positive, and
an infographic has been produced to share results with staff and stakeholders. Staff
survey results have been collated, and an infographic has been produced.  A ‘You
Said, We Did’ session is being facilitated by Quality Improvement colleagues in August
2025 to note areas for celebration and for improvement. Information will be shared
with staff at a future PLT session.  A survey to capture feedback on the impact of the
Practice Educator role was also sent to CTAC staff, Practice Managers and Practice
Nurses. The results have been collated and a themed infographic is under
development which will inform areas for improvement.  A summary of the above
feedback will be shared in the September 2025 PCPIP newsletter. 
31

Page 32

Extended Multi-Disciplinary Team (MDT) Professional Roles 
Since its implementation, significant progress has been made to roll out the 2018 GMS
Contract. 
• All Practices have access to Pharmacotherapy staff
• All Practices have access to all immunisations through the Vaccine
Transformation Programme (except pregnancy and non-routine adult
vaccinations)
• All Practices have access to a Community Link Worker
• All Practices except one in South Ayrshire have access to a CTAC Nurse /
HCSW. 
Due to the funding constraints there is a high risk of not being able to provide these
services across all practices in Ayrshire and Arran creating an inequality of access. In
addition it will widen the gap and increase health inequalities and access to services
for patients resulting in a post code lottery.   Unfortunately the financial envelope within
the new GMS contract does not allow additional funding to be allocated to services at
this stage.  A breakdown of the MSK and MHP roles is noted in the table below. 
HSCP MSK MHP
North 4.5WTE provide cover for 15 of 16
practices
10.2WTE provide cover for 16 of 16
practices
South 4.85WTE provide cover for 15 of 19
practices
4.8WTE provide cover for 8 of 19
practices
East 4.3WTE provide cover for 16 of
18 practices
8.1WTE provide cover for 18 of
18 practices 
The overall additional MDT resource in total is split as follows; 30% in the East, 35%
in the North and 30% in the South. This was based on practice population at 2019-20
and was largely in keeping with the partnership patient list size. The figure below
details practice population in 2025: 
• East Ayrshire – 136,663 patients (35%) across 16 Practices
• North Ayrshire – 144,433 patients (37%) across 19 Practices
• South Ayrshire – 108,890 patients (28%) across 18 Practices 
It should be noted that the analysis of the extended MDT workforce aligned to the new
GP contract has been captured at a moment in time and can vary across the year. 
3.3 PRIMARY CARE IMPROVEMENT FUND 
The implementation of the 2018 General Medical Services contract for Scotland
intended to see an additional investment of £250m per annum in support of General
Practice by 2021.  
32

Page 33

This was part of an overall commitment of £500 million per annum investment in
Primary and Community health services that was previously committed by Scottish
Government.   
Since 2021/22 and 2022/23 Primary Care Improvement Fund (PCIF) was allocated as
tranche 1 and tranche 2 based on projections and spend against each of the IJBs
National Resource Allocation Committee (NRAC) share. 
Although the focus changed in 2022 to pharmacotherapy and CTAC, the HSCPs
continued to invest in the additional wider roles set out as above.  Each area has been
at different stages throughout, and prioritised different services based on their
population need. 
It should be noted that as the PCIF is ‘flat cash’ all pay awards/uplifts are consumed
within the budget itself.  This has impacted significantly on the funds available for
additional investment. 
PCIF budget for 2025/26 has been confirmed as £13.4m plus £1m reserves carried
forward from previous years.  Discussions are still required to take place with all three
HSCP’s in relation to a pan-Ayrshire approach to the Primary Care Improvement Plan
budget for 2025/26. There are challenges with this budget not being managed pan-
Ayrshire which has continued to delay recruitment in some areas.   
• East Ayrshire - £409,154.16
• North Ayrshire - £46,142.68
• South  Ayrshire – £636,134.24 
3.4 GP Practice Premises 
Many GP practices are facing increasing challenges to accommodate the number of
additional staff aligned to them through the PCIP. The lack of availability of
assessment rooms means some practices are unable to access their full allocation of
MDT resource therefore capacity to appoint patients to these practitioners is reduced. 
Many of the buildings within the GP practice estate are also needing significant
investment or alternative accommodation identified for longer term viability. 
Work has been undertaken throughout 2024 to examine patient populations and
premises across each of the three HSCP areas and consider the best use of the
estate, virtual appointment delivery and scoping potential for some MDT services to
be provided from local community hubs and where these could be located. 
The Primary Care and Property Teams are taking forward a review of the Buchan
Associates report, the work undertaken in 2024 regarding populations and premises
with a view to developing a premises strategy with each HSCP. 
33

Page 34

3.5 COMMUNITY OPTOMETRY 
Community Optometrists provide a first point of treatment for eye problems. If people
require medicine for a basic eye problem this is provided free of charge from the
community pharmacy through Pharmacy First Scotland.  An increasing number of
Optometrists are now Independent Prescribers.  There are currently 50 Independent
Prescribers based within 28 Community Optometry Practices who can now also
manage complex eye issues by prescribing medicines such as topical steroids and
oral antibiotics.  This reduces the number of referrals to secondary care.   
Community Optometry provides a range of services in addition to routine eye
examinations and dispensing glasses etc.  Optometry practices can carry out post-
operative cataract reviews, some are accredited to undertake Diabetic Eye Screening
and some provide the Low Vision Aid service.   
Community Optometrists also have access to digital clinical systems such as Clinical
Portal, which allows better patient management.  Work is also underway to further
develop new pathways and determine further areas of ophthalmic care which can
transition into a community setting.   
The national General Ophthalmic Services (GOS) Specialist Supplementary Service
will roll out from August 2025. This involves Independent Prescribing Optometrist
treating 10 more challenging conditions, including Anterior Uveitis. This scheme
enables the inter-referral from an Optometrist to an Independent Prescribing
Optometrist. This allows more people to be treated closer to home, in the community. 
Clinical Portal Access 
This is now in place within a number of Optometry practices with Optometrists actively
using the system when reviewing patients.  Having access to the clinical portal has
proved to be invaluable and provide a more informed consultation as it allows the
clinician to access the patients clinical history and medications. 
Uveitis / Juvenile Idiopathic Arthritis Service (JIA) 
The local service for Anterior Uveitis and JIA screening are now in operation, with a
total of 26 practices providing the Anterior Uveitis side of the service and three
practices for the JIA service. A total of 46 patients were seen in Community Optometry
for Anterior Uveitis in the first six months of the service being available and anticipated
this will show a gradual increase. The local Anterior Uveitis service will soon end as
Scottish Government plan to roll out a national service under GOS. This will allow
Optometrists who are Independent Prescribers to claim a new fee (Specialist
Supplementary fee) for managing complex acute anterior eye conditions.  It is
anticipated that this new GOS Specialist Supplementary service will be implemented
around autumn time this year. 
34

Page 35

Community Glaucoma Service (CGS) - The management of stable glaucoma
patients in the community 
There are currently four accredited Optometrists qualified to provide the CGS within
practices in Kilmarnock, Irvine, Largs and Prestwick.  A new NESGAT candidate
(based in Kilmarnock) commenced in January 2025, with an expected date for
qualification around September 2025. 
Progress on the roll out of OpenEyes in secondary care to facilitate the implementation
of the CGS has been slow due to delays from Digital Services in completing various
actions including submitting the Data Protection Impact Assessment, (signed off now
– June 2025) and progressing Trak integration. Timescales for the completion of these
actions will have an impact on which version of Open Eyes will be used, as an updated
version is due in the coming months. This may impact on the start date of the CGS to
avoid a clash with the wider OpenEyes upgrade. 
Whilst there are concerns around the OpenEyes pathways for outpatients, the CGS
pathway is a national pathway and Optometry colleagues are content with the
structure of this, although it will require training across both primary and secondary
care. Work continues to be underway for CGS in terms of identifying CGS candidates
and establishing the capacity of qualified Optometrists for the next 12 months and
identifying required user groups. We are committed to ensuring the local elements of
the CGS roll-out are in place by March 2026, with appropriate risks identified and
mitigated as necessary. 
Complex Contact Lens Fitting 
The review of the Complex Contact Lens Fitting service is underway and remains a
priority. Capacity, financial and resilience implications continue to be highlighted as
high risks and analysis has shown that only five local optometry practices are currently
providing 98% of this service activity. Recent discussions with the Optical Contractors
Committee have highlighted the need to encourage new optometrists to provide this
service and to do so will require robust training and accreditation, although it is
understood there is no recognised single training source available.  Engagement will
continue with the Contractors Committee and Ophthalmology colleagues to reduce
and ultimately remove the risk around this service.  A new claim form has been
devised and information on claims for 2024/25 is awaited from Practitioner Services
Division.  The Primary Care Team have also been looking at various claim elements
of the scheme and plan to revise these also. 
Provision of the service remains a risk due to the number of skilled providers in the
community.  There remains a concern around future provision of this service. This is
on the Primary Care risk register and alternative models for complex contact lens
provision across Ayrshire and Arran is currently being scoped out.   
35

Page 36

3.6 COMMUNITY PHARMACY 
The number of community pharmacies reduced in 2024/5 from 99 to 97 however has
now stabilised at 98, following the opening of a new pharmacy in Monkton in May
2025. Unplanned Pharmacy closures during the first quarter of 2025 were as follows: 
• April 2025 – 9 closures weekday and Saturdays  across the month for a total
of 21 hours which affected all three HSCP areas
• May 2025 - 3 closures weekdays across the month for a total of 3 hrs 15 mins
which affect only South and East HSCP area
• June 2025 - 6 closures weekdays and Saturdays across the month for a total
of 9 hrs 55 mins which affected all three HSCP areas 
These closures were mainly as a result of locums arriving late or cancelling plus power
cuts and staffing issues and were predominantly closures for short periods, with no
significant impact to patients.   
A review of Community Pharmacy opening arrangements is currently underway
following a proposal from Community Pharmacy Ayrshire and Arran (CPAA) to close
or reduce some pharmacy opening hours on a Saturday. Around a third (36) of
Community Pharmacies have intimated their wish to close on a Saturday or vary their
opening hours. The Board’s current hours of service scheme for community pharmacy
allows pharmacies to close half day on a Saturday however some choose to open all
day. Access to services is the priority concern therefore analysis is underway to
determine the impact on patient access, increasing workload on neighbouring
pharmacies and if a test of change could be undertaken to monitor and evaluate
further.   
Pharmacy First Scotland 
The NHS Pharmacy First Scotland service was introduced on 29 July 2020 in
community pharmacies which contributes to urgent care delivery being the first contact
for patients for a range of common clinical conditions. Patients who may have
previously needed to see a GP or attend out of hours services can access appropriate
care through this service which is available to all patients resident in Scotland or
registered with a Scottish GP.  Currently, all 97 pharmacies in Ayrshire and Arran
deliver this service providing advice and treatment (if appropriate) which includes
urinary tract infections for women aged over 16, impetigo, shingles, skin infections
and a hay fever service where treatments that were previously only available via
prescription can be provided from community pharmacy. 
In addition, 48 of the 97 Community Pharmacies in Ayrshire and Arran now have
Pharmacist Independent Prescribers which allows them to offer the Pharmacy First
Plus service. This enhances the Pharmacy First service to include assessment and
treatment of acute common clinical conditions thus reducing the need for onward
referral of patients to other healthcare providers even further. 
36

Page 37

The number of Community Pharmacies able to offer this enhanced provision
continues to grow as more pharmacists undergo the training and gain the independent
prescribing qualification. 
In addition to the national services available, locally negotiated services are also
available which have been specifically developed with the needs of the local
population in mind. Not only are community pharmacy able to treat common ailments,
they are also a great source for patients to get information and guidance to help
prevent illness, keeping the population of Ayrshire and Arran as healthy as possible. 
Protected Learning Time (PLT) 
Working with the local NHSAA Community Pharmacy Committee, Ayrshire and Arran
successfully launched the first of a rolling programme of Protected Learning Time
(PLT) for community pharmacy in 2024. This allows community pharmacies the
opportunity to close a half day every three months to deliver staff training in much the
same way as our GP colleagues do. This has been well received and will be continuing
throughout 2025/26, sharing ideas for learning across the local pharmacy network
following each session. 
3.7 DENTAL SERVICES 
Recognising the workforce and access challenges, as well as the opportunity to
enhance what we can deliver in Ayrshire and Arran collectively across all dental
services, a programme of work was started in 2023/24 and continues to be developed
to reset the vision and strategy for dental services.  There was acknowledgement that
the current challenges being faced with workforce retention and access also provided
opportunity to ensure our services are in the right place to deliver care wrapped
around individuals. This will allow greater understanding of the population need, the
current status of all services within dental and determine what a future delivery model
for dental services could look like. 
Following this in-depth review, the delivery plan is in progress through the appropriate
governance arrangements.   The Senior Dental Management Team are working
towards the aims of the plan. Once formally approved, the plan will be the focus of
work for the Dental Team throughout 2025/26. 
General Dental Services (GDS) 
Access to dental services has remained stable with no significant changes. The
number of General Dental Practices (GDPs) accepting new NHS patients fluctuates
monthly but is overall consistent. Access in some specific areas remains a challenge
however this is kept under close review.  South Ayrshire has remained an area of
concern due to the low numbers of practices accepting NHS patients however the
situation has now improved due to two new practices opening in Troon and Ayr who
are currently registering NHS patients.  
37

Page 38

As at 5 September 2025, 22 Dental Practices across Ayrshire were accepting new
NHS patient registrations: 
• East Ayrshire – 5
• North Ayrshire – 11
• South Ayrshire - 6 
The Dental Team continue to keep in regular contact with GDPs to understand in detail
the status of their service delivery to be aware of any issues early to be able to resolve
and support where possible.  The service also continues to prioritise prevention and
oral health improvement to reduce the possible burden of dental disease and mitigate
the impact of reduced dental access. 
Public Dental Service (PDS) 
The PDS core function operates Monday to Friday with emergency appointment slots
available as a safety net for practices who are unable to offer emergency
appointments. 
The Emergency Dental Service (EDS) service operates Out of Hours (OOH) Saturday
and Sunday 9 am – 3 pm with 44 appointment slots available. Some weekends the
service will get near to capacity but has not exceeded capacity.  Following an initial
trial period, the EDS has been further enhanced with a weekday service along with
the weekend provision. Following a recent analysis of activity, the EDS now offers two
full day and three half day sessions Monday to Friday. 
The EDS service has contingency arrangements in place for a stand by team should
the reach capacity. The OOH service is accessed via NHS 24 and on review of the
national reporting, demand has not increased to NHS 24 from Ayrshire and Arran. 
In 2024 8% more patients attended the PDS for emergency care appointments
compared to 2023.  Although the rate of increase in patients accessing emergency
care is slowing, the cumulative effect of previous years mean that the service demand
has increased by 28% since 2022. 
PDS Referrals 
The overall number of referrals to the PDS remains above pre-pandemic rates,
although adult referrals are slowly returning to normal. During 2024, paediatric
referrals were still 28% higher than in 2019. 
Both Adult and Paediatric waiting times are currently over 20 weeks for assessment
appointments and due to capacity issues, treatment plans are taking over a year to
complete. 
38

Page 39

Dental provision within the Prison Service 
Due to HMP Kilmarnock implementing changes to their service model, the number of
prisoners on the dental waiting list has increased significantly resulting in compliance
with the 18 week referral time dropping from 90% in August 2024 to 38% in May 2025. 
The Primary Care Dental Management Team are working with the Scottish Prison
Service to improve this and increase the numbers of patients being seen. Current
waiting time for assessment is around one year.  Dental Sessions are provided three
times per week but are underutilised by the prison and not running to full capacity.  An
increase of population numbers would further impact on treatment waiting times.   
Childsmile Programme 
The Childsmile Toothbrushing Programme is a supervised programme aimed at
helping children develop an important life skill at an early age, supporting positive
development in their immediate social and physical environment.  Across Ayrshire the
programme is delivered in:- 
• 134 Early Years/nursery schools
• 14 Additional Support Needs (ASN) schools 
• 98 Primary 1 & 2 classes in all priority primary schools. 
The Childsmile team also have a dedicated team of Dental Health Support Workers
who support family’s additional support and oral health advice. In total 7,642 children
have received one fluoride varnish application between August 2024 and June 2025. 
A breakdown of the number of schools visited is noted below: 
• 34 in East Ayrshire 
• 40 in North Ayrshire 
• 26 in South Ayrshire 
A total of 213 children receiving fluoride varnish were then offered additional support
from the Childsmile team.   
Oral Health Improvement 
Oral Health prevention is a key priority across Ayrshire and Arran.  The Oral Health
Improvement Team continue to strengthen links within the community, delivering local
training programmes, educating the population on good oral health practices with a
priority on prevention and providing support for local groups and events. 
The team deliver training and interventions for priority groups following recognised
national training programmes. The training programmes are tailored to individual
needs of the population within each of the priority groups. 
39

Page 40

At a population level this includes: 
• Providing training materials for nursery, primary and secondary schools
(these can be borrowed free of charge)
• Promoting how the benefits of good oral health can improve general
health via training and social media
• Actively participate in National Oral Health Improvement initiatives such
as National Smile Month and Mouth Cancer Action Month. 
In addition, directed support targeting priority groups in greatest need through: 
• Deliver the Caring for Smiles programme to every care home in Ayrshire 
• Provide Caring for Smiles training for care home staff
• Provide Mouth Matters training and interventions for prisoners and prison
staff
• Provide Open Wide training and interventions for adults with additional
needs
• Provide Smile4Life training and interventions for homeless/addictions 
• Facilitate a referral service (Dental Access Programme) for
homeless/addictions to the Public Dental Service 
• Deliver bespoke training and interventions for children with additional
needs  
3.8 KEY PRIORITIES / DELIVERABLES 2025/26
A number of priorities have been agreed for 2025/26 across the Primary Care
Leadership Team: 
• General Practice Clusters will continue to be supported to undertake quality
improvement initiatives identified through local data analysis. 
• Review the GMS Contracts of Independent Contractors to help identify any
improvement work and understand key themes.
• Continue to review the local and national Enhanced Service specifications
being delivered across General Practice to ensure they are fit for purpose.
• Continue to work with Digital Services to enhance digital telephony within
General Practice and move to a single resilient digital telephony platform.
• Deliver the Primary Care Phased Improvement Programme to demonstrate
what a model of full implementation of the MDT (focussing on CTAC and
Pharmacotherapy) can look like in General Practice. 
• Continue to develop Openeyes for roll out in primary and secondary care
so the Community Glaucoma Service can be implemented.
• Investigate the feasibility of establishing a low visual aid service for
children. 
• Transition from the Community Uveitis Service to the National Specialist
Supplementary Service covering 10 eye conditions from August 2025.
40

Page 41

• Review the provision of hospital contact lenses in the community looking at
skill levels, accessibility and training. 
• Work to improve dental access for patient care within dental practices with
the aim to reduce waiting times and provide a greater range of services.
• Develop a virtual capacity network by developing a Single Point of contact
through AUCS Flow Navigation Centre to encompass Hospital at Home
and Community Rapid Respiratory Response programme to ensure a
seamless pathway to services for patients.
• Evaluate the Test of Change of the urgent care pathway for GPs to refer
patients for a home visit during OOH and consider extending the model for
pre-bookable appointments at an AUCS Primary Care Treatment Centre. 
3.9 QUALITY/ PATIENT CARE 
Quality improvement within General Practice Clusters has continued to develop and
strengthen.  A range of improvement work has been carried out by the Clusters with
some pieces of work done in collaboration with NHS HIS. Online Continual
Professional Development events are hosted fortnightly with an open invite to staff in
the whole MDT working in General Practice. Clinical Directors also meet regularly with
Stakeholder GPs to understand any barriers for improvement within clusters and
ensure they are supported to undertake quality improvement initiatives identified
through local data analysis. 
All GP Practices, and now extended to Community Pharmacy teams, across Ayrshire
and Arran are offered regular afternoon sessions throughout the year for Protected
Learning Time (PLT).  This allows the teams to come together to focus on reviewing
service delivery models, staff development, discuss any opportunities for learning or
improvements and opportunities for future ways of working.  Calls into the GP
practices participating in PLT on these afternoons are re-directed to AUCS to support
patients during this time. 
3.10 Anticipated Outcomes 
The purpose of the work underway is to help people access the right person, in the
right place, at the right time in line with the Scottish Government Primary Care Vision
and Outcomes, including: 
• Maintaining and improving access
• Introducing a wider range of health and social care professionals to support
the Expert Medical Generalist 
• Enabling more time with the GP for patients when it’s really needed
• Proving more information and support for patients. 
41

Page 42

3.11 Measuring Impact 
As we have worked to build our devolved Health and Social Care System in Ayrshire
and Arran, the critical role of primary care has been emphasised throughout
implementation to date, and is viewed as a core component of an integrated
community based care system. 
This provides a solid foundation for developing a whole system health and care model
which focuses on individuals, families and communities with general practice and
primary care providing accessible, continuing and co-ordinated care. 
The aim is to empower people to take control of their own health and care as far as
possible, enabling self-management, promotion of wellbeing and prevention of ill-
health, use of telecare and telehealth and maximising care provided in and around
communities.
Continued implementation of the PCIP has created opportunities seen in the context
of the aim of the Caring for Ayrshire agenda to design a fully integrated system wide
approach to ensure people are able to access the right care at the right time in the
right place.   Primary care clinicians have more interactions with patients than other
parts of the NHS therefore the whole system transformational change relies on
sustainable and accessible primary care services.  
4. IMPLICATIONS 
4.1 Financial 
Primary Care Improvement Fund – the allocated fund available for the PCIP is not
sufficient to ensure full roll out of the wider MDT roles.  The projected additionality for
CTAC and Pharmacotherapy is captured within the Demonstrator Site bid and
funding.  This will create an inequity across practices and different populations.  There
has been a request to NHS HIS to capture the impact of this as part of the evaluation
process.  Discussions have taken place nationally to baseline the PCIF into core
budgets, but there is no agreement on this to date.  Until the budget is baselined, the
cost pressure associated with agreed pay awards will continue to impact on the
number of roles that can be recruited to. 
Phased Investment Programme Demonstrator Site – the funding associated with
this programme of work will continue up until end of March 2026.  There is no
commitment beyond this time period but discussions with Scottish Government are
ongoing for future sustainability of the programme.  The detailed work being taken
forward as a demo site will inform future investment within Primary Care, however,
there is no guarantee of recurring funding.  Discussions are taking place as the
programme continues to determine staff turnover projections and the risk appetite at
an IJB level to determine permanent vs fixed term job roles.   
42

Page 43

GP Practice Sustainability payments – there has been an increase in the number
of practices who have indicated to the primary care team that they have sustainability
concerns either relating to practice income or relating to their premises.  Historic
payments have been agreed with practices operating under a 17C contract which will
be reviewed 2025/26 and the primary care team will also be working closely with all
practices to understand sustainability concerns in more detail, providing guidance and
support with the Local Medical Committee also.  There is no dedicated sustainability
funding allocation available for practices.  The national GP Sustainability Loan
Scheme for premises has been in place since 2018 which is open to all GP Practices
who own their building to apply for an interest free sustainability loan up to the value
of 20% of their property.   
In 2024/25 Scottish Government paused applications for new GP sustainability loans,
however, the loan scheme for tranche 1 applications restarted in April 2026 and this
is only available to practices who had already submitted an application. Specifically
for 17C practices there is a risk that the current level of payments does not meet the
financial sustainability of the practice and therefore puts the practice at risk of
resigning from their GMS Contract as the practice no longer becomes financially
sustainable to continue in its current form.  
4.2 Human Resources 
GP workforce remains a risk with a number of GPs retiring or choosing to leave the
profession.  There is ongoing work with current GPs and also trainees to make GP
roles as attractive as possible in Ayrshire and Arran to improve workforce retention.    
4.3 Legal 
None. 
4.4 Equality/Socio-Economic 
The aim through the reformed primary care service is not just to extend life, but aim
to reduce the time spent in poor health.  Continued development to implement the
priorities of the 2018 GMS Contract and developments within community optometry
to integrate additional treatments from secondary care into a community setting is an
opportunity to mitigate health inequalities where possible. 
There is a risk that those who already experience socio-economic deprivation will be
disproportionately affected by dental access issues as they will be unable to pay for
private dental care. The financial and social impacts of additional travel to access
dental care should not be underestimated. 
4.5 Risk 
Sustainability of GP practices is at risk while the new GMS contract is being
implemented.  
43

Page 44

For those practices who have highlighted risks to service delivery or workforce
availability, the Primary Care Managers carry out bi-monthly meetings with the
Practice Manager and GP Practice Quality Lead to understand the practice issues
and risks. 
There is a risk of not being able to implement all aspects of the 2018 GMS contract
due to financial constraints and the ability to recruit to additional professional roles to
either expand the MDT teams, ensuring sufficient resilience for leave or vacancies
within each of the services.  
4.6 Community Wealth Building 
The wellbeing of people and communities is core to the aims and successes of
Community Planning.  The PCIP, delivered as an integral part of the Wellbeing
Delivery Plan, Integration Authorities Strategic Commissioning Plan of both the NHS
and Council, will contribute to support this wellbeing agenda. 
4.7 Key Priorities 
The strategy and programme outlined in this report will assist the IJB to deliver the
following Strategic Objectives from its Strategic Plan to: 
• Provide early and effective support
• Improve mental and physical health and wellbeing
• Develop and support our workforce 
5. CONSULTATION  
Consultation regularly takes place through all Primary Care structures involving all
stakeholders across each HSCPs and Professional Committees. 
Ongoing communication with all stakeholders and the population will be critical as
implementation and reform progresses. 
Debbie McGill
Head of Primary and Urgent Care Services
Debbie.McGill@aapct.scot.nhs.uk 
Implementation Officer and Person to Contact:
Claire McCamon
Senior Manager Primary Care Services
Claire.McCamon@aapct.scot.nhs.uk 
11 September 2025 
44

Page 45

Integration Joint Board
25 September 2025
Subject : Primary Urgent Care Update 
Purpose : This report is for awareness to provide an update to the
Integration Joint Board (IJB) on the provision of primary urgent
care services delivered through the Ayrshire Urgent Care Service
(AUCS).  This report also updates on innovative pathways
developed and tested throughout 2024. 
Recommendation :  IJB Members are asked to: 
a) Note the progress of the Urgent Care agenda across Ayrshire
and Arran
b) Note the increased activity within AUCS as a result of the new
pathways introduced to ensure patient care is delivered as
close to home as possible 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
ANP Advanced Nurse Practitioner
AUCS Ayrshire Urgent Care Service
COPD Chronic Obstructive Pulmonary Disease
ED Emergency Department
ESMHP Emergency Services Mental Health Pathway
FNC Flow Navigation Centre
HSCP Health and Social Care Partnership
IJB Integration Joint Board
MIU Minor Injuries Unit
NHSAA NHS Ayrshire & Arran
OOH Out of Hours
PCTC Primary Care Treatment Centre
PEOL Palliative End of Life
PLT Protected Learning Time
RRR Rapid Respiratory Response
RUC Redesign of Urgent Care
Agenda Item 6
45

Page 46

SARCS Sexual Assault Response Co-ordination Service
SAS Scottish Ambulance Service
SPOC Single Point of Contact
ToC Test of Change 
1. EXECUTIVE SUMMARY 
1.1 AUCS operates 7 days per week, 24 hours per day and incorporates a pan Ayrshire
GP led Flow Navigation Centre (FNC). During the out of hours period this includes the
provision of general medical care incorporating remote assessment and treatment. 
Further information on this unique joint approach and the development and growth of
pathways is outlined in this report. 
1.2  This paper provides an overview of the activity of the service, including new innovative
pathways in operation to support an improved patient journey, with continued focus on
community based services.  The data presented demonstrates the impact of the
service avoiding hospital attendances or avoidable admission to hospital which has
better outcomes for patients. 
1.3  The success of the new pathways is a result of good working relationships across
Ayrshire and Arran and wider system partners including NHS 24, Scottish Ambulance
Service (SAS), Police Scotland, as well as strengthened connections with GP practices
and Community Pharmacy.  All new service developments are created in partnership
across clinical and managerial leadership teams from relevant stakeholders.   
This report has been presented to:
i. East Ayrshire IJB – 27 August 2025
ii. South Ayrshire IJB – 8 October 2025   
This report will also be presented to: 
iii. NHS Ayrshire & Arran Board – 12 December 2025 
2. BACKGROUND 
2.1 The Public Bodies (Joint Working) Scotland Act 2014 provides a legislative framework
for the delivery of Primary Care Services in Scotland with powers and duties delegated
variously to both the NHS Board and the IJBs. Through these arrangements the three
Ayrshire IJBs commission, through Directions, NHS Ayrshire & Arran (NHSAA) to
provide Primary Care Services. This includes provision of Out of Hours (OOH) Primary
Care Services through AUCS.  This is delivered through the Director of East Ayrshire
Health and Social Care Partnership (HSCP) in a lead partnership arrangement. 
In addition, NHSAA directly commission East Ayrshire HSCP to conduct Primary Care
Contracting on behalf of the Board, this being a function that cannot be delegated to
IJBs at this time.  
46

Page 47

AUCS fulfils the vision of developing a multi-disciplinary integrated approach to OOH
services in Ayrshire.  AUCS continues to build on the unique 24/7 model which
incorporates OOH and FNC through continuous review of all pathways to evaluate
efficiency and effectiveness to create and sustain fully person centred pathways for all
patients, getting the right care in the right place at the right time.   
3. PROPOSALS 
3.1 There are various services and pathways included within AUCS which are available
24/7 and others during the OOH period (Monday to Friday 6 pm – 8 am and
Saturday/Sunday).  The OOH District Nursing and OOH Social Work teams are
managed through East Ayrshire HSCP and the OOH Mental Health Crisis Team who
are managed through North Ayrshire HSCP.  All other pathways and services are
supported within the current AUCS management structure. 
The 24/7 pathways and call handling services are: 
• SAS Call before Convey 
• Emergency Services Mental Health Pathway (ESMHP) 
• Palliative End of Life (PEOL) Support line
• 111 Emergency Department (ED) /Minor Injuries Unit
• National Hub - Sexual Assault Response Coordination Service (SARCS)
self-referral service 
AUCS and FNC Activity - In the first six months of 2025 there have been 54,325
contacts to the AUCS FNC with just 12% requiring onward transfer to hospital.  In the
same time frame in 2024, there were 58,520 contacts with 11% requiring onward
transfer to hospital. 
Call Handling Service - The call handing service has the highest volume of activity
within the OOH service, when acting as the single point of contact (SPOC) for various
services across East, North and South Ayrshire HSCPs. It includes direct calls from
families and patients to Care at Home, Out of Hours Social Services and District
Nursing Services. Throughout January to June 2024, call handling for these pathways
reflected an average of 4864 contacts.  However, with the additional PEOL Support
Line and Palliative Services, we see this average rise to 6426 contacts per month for
the first six months of 2025. 
GP Out of Hours Service – The OOH service is accessed via calls to NHS24 111
which are then passed to AUCS with a priority based on clinical need of one, two or
four hours.  
Throughout January to June 2025 the monthly average of contacts was 7458. 
Proportionately 42% of workload comes through the NHS 24 pathway: the remaining
58% from the other pathways supported through AUCS. In the first six months of 2024
the average monthly figure was 7910, a slight decrease in the number of contacts. 
47

Page 48

All patients that are referred to AUCS OOH from NHS 24 go through a full clinical
assessment within the triage time set by NHS 24 with an outcome of either: 
• Self-Care;
• A prescription issued for collection at a local pharmacy;
• An appointment at a local Primary Care Treatment Centre (PCTC). There
are three PCTCs covering Ayrshire; based at University Hospital Ayr,
University Hospital Crosshouse and Ayrshire Central Hospital;
• A home visit undertaken by GPs / Advanced Nurse Practitioners (ANPs) in
dedicated cars with driver support colleagues. 
The first six months of 2025 reported an average 94% of patients being clinically
assessed within the set timeframe from NHS 24.  This figure has improved slightly
compared to the same period of 2024 when it was 90%. This reflects sustained
improvements to pathways and clinical resources with a consistent number of
clinicians actively undertaking sessional shifts with the service.  Factors impacting this
performance includes periods of high demand where clinicians will prioritise the most
vulnerable patients, including calls received with one and two hour response times,
and patients who are non-contactable for several hours following receipt of the case
from NHS24.   
A non-urgent patient transport service is available to take patients to OOH PCTCs, in
Ayr, Kilmarnock or Irvine if they have no other means of transport. All clinicians are
aware of the criteria outlined below of this resource which is fully funded by the service:  
• Those who are deemed to need further clinical assessment at hospital on a
non-urgent basis and are not suffering from conditions that are life
threatening or deemed as an emergency
• Patients who have been assessed face to face, virtually or via telephone by
a clinical member of GP practice or AUCS clinical staff
• Patients who have no alternative means of transport to the requested
destination 
Ayrshire and Arran covers an expansive caseload due to patients living in rural areas
with infrequent / limited access to public transport, who particularly benefit from this
element of patient transport.  Throughout January to June 2025, there were 822
journeys recorded: a marginal increase from 812 for the same timeframe in 2024.  It
should be noted that this service also supports GP Practices and both hospital front
doors where an ambulance is not required and the patient has no means of transport.  
The use of patient transport has also reduced the number of home visits required to
be undertaken by a mobile clinician.  This has allowed the service to adjust and flex
the workforce to other areas of demand.   
48

Page 49

The ‘clinical triage first model’, for all OOH calls from NHS 24, remains in place. This
results on an average of 58% of calls closed off remotely throughout the first six months
of 2025; a slight decrease from same reporting period in 2024 when the figure was
59%. The majority of remote consultations will relate to pharmaceutical enquiries, a
change in symptoms or clinical advice.   
The remote first model reduces the number of urgent care home visits and centre
appointments across the three sites, prioritising face to face assessment time for those
most in clinical need.  It should be noted that a full clinical remote assessment can still
take 15 minutes therefore robust clinical capacity is still required.   
Through the use of extended data analysis, the AUCS management team altered the
service delivery model in 2023 to meet projected clinical demand through the
implementation of two seasonal model types, Spring/Summer (1 April to 31 October)
and Autumn/Winter (1 November to 31 March).  This was closely monitored throughout
the year with the assurance of adequate flex and preparedness within the workforce
to be able to swiftly respond to any emerging challenges, e.g. alerts from Public Health.   
The current model relies heavily on GP engagement for service delivery.  Throughout
2024, a total of 68 clinicians were approved to undertake sessions from within Ayrshire
and Arran, as well as other NHS Board areas, with a further 18 clinicians approved
between January to June 2025.   
111 Emergency Department/Minor Injuries – patients who think they require to
attend the ED are directed to contact NHS 24 (111) for their urgent care needs as a
first point of contact.  NHS 24 assess the patient’s needs and then route patients who
require further assessment to the FNC operational within AUCS over the 24/7 period. 
The Senior Clinician, usually a GP, will clinically assess the patient remotely and
determine the best outcome through the most appropriate care pathway which could
include: 
• Closed as assessment and care provided by a clinician over the phone with
self-care advice
• Directed to their GP practice (during in-hours)
• Scheduled for a home visit by an AUCS clinician (during out of hours)
• Appointed to a PCTC (during out of hours)
• Onward refer to a community service and
• Appointment at the Minor Injury Unit (MIU) 
OOH District Nursing Team - to provide planned and urgent community based care
to patients including palliative care where necessary.  Patient referrals in the first six
months of 2025 have remained static at on average 1898 per month which is very
slightly reduced by seven contacts from the average number of contacts in the same
timeframe in 2024. 
49

Page 50

Pan Ayrshire OOH Social Work team - a range of Senior Practitioners and sessional
social work staff ensure the delivery of a professional OOH response to the immediate
needs of individuals and families across all social work services, including those
considered as vulnerable or at risk.  Established links with Police Scotland, health and
education services remain a constant with the team.   
The OOH Social Work team received an average of 781 referrals per month in the first
half of 2024.  This compares with 822 in the same period of 2025.  Our OOH Social
Work colleagues report that the complexity and needs of referrals continues to
increase. 
Mental Health Crisis Team - continues to operate as part of AUCS in the OOH period
providing urgent access to relevant community mental health services.   The Mental
Health Crisis Team support a range of services out with AUCS in the OOH period with
a consistent average of 140 calls via NHS 24 / AUCS on a monthly basis throughout
the first half of 2025. This has decreased from an average of 152 for the same
timeframe in 2024. 
COVID-19 Therapeutic Service - the service has been delivered through AUCS since
December 2021 within the Community Clinical Treatment Centre. This supports a
specific cohort of patients deemed as very high risk of progression to severe disease
and/or death if they develop COVID symptoms and test positive for the virus and
therefore require intervention in the form of COVID therapeutics. 
With the decrease of frequency of COVID outbreaks throughout the past 12 months,
resulting in fewer people being referred for treatment, the decision was reached to
stand down the regular Multi-Disciplinary Meetings designed to consider eligibility for
treatment and agree treatment plans.  There remains a facility for patients to self-refer
or via their GP if they think they are eligible for treatment with adequate service
provision to meet the current level of need. 
The COVID Therapeutic Service was funded in 2023/2 and 2023/24 on a non-recurring
basis utilising bank and vaccination staff.   Activity is continuing to be monitored to
consider all options of care for these patients. 
The following table shows a breakdown of referrals throughout 2022, 2023 and 2024.
The first six months of 2025 has seen a total of 19 referrals with nine receiving antiviral
treatment and none admitted to hospital. 
Year Referrals
Receiving
Antiviral
Treatment
Later Admitted to
acute hospital for
further Covid-19
related illness
2022 1784 901 10
2023 625 423 6
2024 237 231 0
50

Page 51

National Hub - Sexual Assault Response Coordination Service (SARCS) self-
referral service – AUCS continues to act as the National Hub for all SARCS self-
referrals Scotland wide, working in collaboration with NHS 24 and ensuring that all
referrals, regardless of where the person is in Scotland, are managed within agreed
timescales.   
The Hub operates 24/7 and ensures that all referrals from NHS 24 are triaged and
directed to the appropriate Board pathway.  The Hub delivers a back office function
without the need to speak to the person self-referring into the service. 
Between January to June 2025, a total of 231 referrals were processed by the National
Hub (190 x acute; 36 historic; 5 x 13-15yr old).  Of the 231, 18 were duplicate referrals
bringing the total number of patients supported through the pathway to 213 - an
increase of 13 for the same period in 2024.  There is no clearly identifiable trend to
enable forecasting the volume of self-referrals being received on particular days /
times. 
Strong relationships have been maintained with NHS 24 and national SARCS Policy
Unit colleagues within Scottish Government through regular engagement to share
learning, identify emerging issues with solution focussed discussions. 
It was recognised as part of the bid to host this national service that Ayrshire and Arran
had a robust infrastructure in place 24/7.  The only additionality required were two
Agenda for Change Band 2 call handlers to bolster that cohort of staff.  Non-recurring
national funding has been agreed to fund this. 
Care and Nursing Home Pathway – as reported previously, this pathway provides
direct access to the FNC within AUCS during the OOH period as an alternative to the
NHS 24 process, reducing delays by using the NHS 24 route and replicating in hours
service by a care home’s own GP practice.  Direct calls to the FNC for clinical
advice/assessment reached 2525 in the first six months of 2025; an increase of just
70 from the previous year, showing that this pathway is working well and care and
nursing homes are using it consistently. 
This local model has seen 4% of calls through this pathway attending hospital with
only 2% going on to be admitted. This compares to attendance/admittance rates via
SAS 999 of 26% and NHS 24 17%.  The data for the first six months of 2025 is
comparable to the 2024 data. 
Referral process in place for GP Practices - to schedule Minor Injury Appointments
via the FNC where patient transport can also be arranged.  This has reduced the
number of ambulances being requested and the majority of patients are seen within
the MIU around their appointment time therefore reducing the crowding in EDs. There
were 377 GP Practice referrals to the FNC through the first six months of 2024, which
also includes any referrals from GP Practices to request a revisit or patient follow up
from a clinician in the OOH period.  
51

Page 52

In the first six months of 2025 there have been 276 referrals; this pathway has probably
been impacted by the GP to AUCS for Home Visit Test of Change (as described later
in this report). 
Emergency Services Mental Health Pathway (ESMHP) - was fully launched on 30
May 2022 following a successful pilot in early 2022.  SAS and Police Scotland refer
mental health related calls which do not require emergency medical intervention to the
FNC.  This 24/7 service is a whole life pathway with no upper or lower age limits. 
This process involves the FNC facilitating the call to the Emergency Mental Health
Team for initial assessment which includes conversations with the referrer and the
patient, after which a joint decision is made about whether an in-person mental health
assessment is needed, either at the patient’s own home or a specific location within
the community.  This is a more individualised and person-centred approach, providing
the right care in the right place at the right time, and reduces pressure and capacity on
Police Scotland, SAS and the ED teams as well as the opportunity for ongoing follow
up within the community. 
There have been 997 contacts for ESMHP in the first six months of 2025 in comparison
to 1053 in the same period of 2024. Calls are routed via the FNC to the Emergency
Mental Health Team from Police Scotland or SAS.  These patients would otherwise
have formerly been conveyed to the EDs by Police Scotland or SAS which was not
always the most appropriate place for the specific care needed by these vulnerable
individuals.   
Ayrshire’s Mental Health Unscheduled Care Assessment Hub was launched on Friday
13 September 2024.  Based at Woodland View Hospital in Irvine, the Hub is operated
and managed by the Unscheduled Care Mental Health Service and is the first of its
kind in Scotland.   
The Service provides 24-hour access to a patient-focused, therapeutic space to
support the delivery of compassionate care to those individuals with acute mental
illness who would be eligible to access an adult acute mental health bed for ongoing
intensive assessment.  It can accommodate five patients for a period of up to 72-hours
and is delivered by experienced Registered Mental Health Nurses. 
Scottish Ambulance Service (SAS) Call before Convey Pathway – the pathway for
SAS crews attending calls or reviewing calls on their dispatch screens to consider what
input and support the FNC could provide has been fully embedded with positive
feedback from crews. 
AUCS clinicians have continued to attend to confirm life extinct for non-suspicious
deaths for SAS and Police Scotland which helps our emergency services to prioritise
patients with life threatening conditions.   
52

Page 53

Between January to June 2024 there were 1876 referrals to AUCS from SAS, of which
only 9% went on to be referred to hospital as final outcome. Approximately 91% of
referrals didn’t require a SAS crew to convey to the hospital front door.   
In the first six months of 2025 there have been 1544 referrals from SAS with 7%
requiring onward transfer from the crew to hospital.  It is noted that 30% of the Call
before Convey contacts with AUCS are between 8am and 6pm at weekends. 
AUCS clinicians are able to access hospital clinical systems, emergency care
summary, and previous encounters with AUCS. This provides greater insight to the
landscape of a patient’s needs and allows more robust assessment of individual risk. 
SAS contact with patients is not reported back to general practice whereas all referrals
logged via the FNC are recorded via the FNC clinical system (Adastra) and reported
back to general practice.  This allows visibility for the GP Practice to follow up where
appropriate. 
Rapid Respiratory Response Service (RRR) - Ayrshire and Arran has the second
highest Chronic Obstructive Pulmonary Disease (COPD) rate in Scotland with
emergency COPD admissions in 2022/23 34% longer than other emergency
admissions.  The vision for this service, which used a targeted and data driven
approach to service delivery, is to enable patients to remain at home whenever
possible.   
The aim of this service is to:
• Provide specialist respiratory support during exacerbations 
• Improve patient’s ability and confidence to self-manage symptoms
• Support earlier discharge from hospital 
Over the past two years, the service has continued to support patients to enable them
to remain at home wherever possible and now covers 76% of all COPD registered
patients in Ayrshire through collaboration with 31 practices.  There were 5676 patient
contacts from January to June 2025, and the service now has over 1200 registered
patients.  This is an increase from the first six months of 2024 when there had been
4107 patient contacts with 770 patients registered with the service.  The service has
introduced alerts via Trakcare to facilitate early supported discharge for this patient
cohort; so far this has benefited nearly 200 patients. 
Palliative End of Life Support Line - PEOL went live early October 2023 and was
created to facilitate a SPOC for palliative patients for end of life care through the FNC
using existing call handling services.  The service is designed to enable timely
management of unscheduled care episodes for palliative patients in the community
and to address care needs effectively in their normal place of home and prevent
hospital admissions which may not be of benefit to them.   
Between January to June 2024, a total of 93 patients with 290 contacts were referred
to the service.  In the first six months of 2025 there have been 185 contacts for 66
patients. 
53

Page 54

AUCS Palliative Support Service - In early 2024, a review was undertaken of the
community nursing model and the model of care delivery for palliative and end of life
patients. This looked at the future support needs of everyone who may need to receive
end of life care, and how this links with our wider whole system approach. 
The outcome of the review, to ensure best value and sustain continuing care for this
cohort of patients, was to move delivery “in-house” seamlessly migrating it into AUCS
at the end of May 2024. From June 2024 to the end of June 2025, a total of 181 patients
have benefited from the service with a total of 618 contacts with these patients. 76%
of patients requested a seven night per week cover with 72% of patients requiring this
cover for one week or less.  To date, 97% of patients have also been kept in their
preferred place of care. 
GP to AUCS for HV Test of Change (ToC): Support to GP Practice Home Visits
4pm to 10pm weekday evenings – it was highlighted that GP practices required
additional support for patients who contacted them after 3pm and had been clinically
assessed as requiring a home visit and were safe to wait a maximum of four hours to
speak to a clinician. AUCS facilitated a ToC for eligible patients initially with only four
GP practices.  The scope gradually expanded and now includes a total of 51 of the 53
Ayrshire GP practices (all mainland practices).  During the first six months of 2024, a
total of 243 patients were seen by an AUCS clinician as part of the ToC with only 17%
of these referrals requiring onward admission to hospital. In the same timeframe in
2025 there have been a total of 745 referrals with 19% of patients requiring an
admission to hospital. 
Protected Learning Time (PLT) – throughout 2024 AUCS provided clinical and
operational support for 12 x five hour sessions of PLT.  Each block of three sessions
enabled an average of 50 Ayrshire and Arran GP Practices to deliver PLT for primary
care staff, safe in the knowledge that urgent contacts were managed by AUCS.  This
has proved to be a valuable service to primary care colleagues and arrangements have
continued throughout 2025. 
3.2  Additional Improvement Projects 
Virtual Capacity - Develop a virtual capacity network by developing a SPOC within
the AUCS FNC to encompass the Hospital at Home, Community RRR programme to
ensure a seamless pathway to all services for patients.  This will require the AUCS
management team to develop and embed a referral pathway from AUCS FNC to
Hospital at Home Team; develop a referral pathway from AUCS FNC to RRR Service
and implement organisational change for RRR and Hospital at Home operational staff
to bring them under the SPOC model.   
Plans are in progress to scope the potential for Ayrshire Community Blood Service to
be encompassed within the SPOC. 
54

Page 55

3.3 Quality 
The further development of reporting mechanisms to provide assurance on the delivery
of safe, effective, person centred care in line with the dimensions of the quality strategy
has supported processes to fully investigate complaints and adverse incidents. This
ensures lessons learned are identified and necessary changes and improvements
implemented to mitigate any recurring issues across the service. 
The FNC supports a number of pathways to wrap the professional services around the
patient with an average 1133 calls per month over and above OOH activity.  It is noted
that only 21% (242) of the calls received via FNC attend hospital within 48 hours.  The
remaining 891 are assessed and treated via services within AUCS or navigated back
to community services.  This has also been linked to the sustained reduced level of
ED attendances post pandemic.   
The FNC operates with one clinician and call operator 8am to midnight, seven days
per week.  The model fully integrates with the wider OOH team during the OOH period. 
Moving to a 24/7 service with multiple pathways there was also a requirement to
increase the number of shift team managers to ensure sufficient management
oversight as well as increased clinical support to ensure the pathways operate
efficiently and safely.   
3.4  Next Steps 
The teams will continue to build on the core OOH service and create innovative
solutions to challenges through engagement with the workforce and stakeholders. 
Commitment to adopting continued learning, improvement and development to ensure
the most efficient and effective service delivery model and services in light of the data
informed knowledge that demand, overall activity and patient need for urgent care
continues to evolve. 
3.5 Anticipated Outcomes 
The main aim for AUCS is to provide a prompt and seamless experience for citizens
across Ayrshire and Arran as well as an opportunity to schedule an appointment or
home visit when necessary.  Clinicians and administration staff within the service
feedback on a daily basis that patients are happy with their outcome either when they
receive a scheduled appointment or are directed to the right service first time, and
often at home. 
3.6 Measuring Impact 
Continuous review of current and new pathways must be undertaken to evaluate
impact and effectiveness to ensure improved patient journeys.   
Creative and innovative response to emerging challenges within our region should
continue to play a part in the service ethos. 
55

Page 56

Collaborative work with a wide range of individuals and agencies, including acute and
community professionals, stakeholders including patients, their families and carers,
will continue in order to achieve the vision of providing the right care in the right place
at the right time. 
4. IMPLICATIONS 
4.1 Financial 
The AUCS budget was originally set in 2016/17 based on activity at that time.  Despite
the gradual increase of activity, which has been consistently 20% in 2022 and 2023,
the service has continued to manage to work efficiently re-designing where possible
using data and trends to match the required workforce to demand. 
A review of the COVID-19 Therapeutics Service is currently ongoing nationally to
understand future resource requirements. 
4.2 Human Resources 
A range of staff engagement sessions sharing data and themes in relation to the AUCS
service delivery model and resources successfully informed changes which were
tested during 2024/25 to ensure best practice and best value.    
A programme of opportunities to continue staff engagement is ongoing. 
Throughout the first six months of 2024, AUCS consistently improved on the projected
shift cover reported to the Scottish Government on a weekly basis. The average shift
cover has not dipped below 95% throughout this period with the average for 2025
seeing an increase to 98% for the same period. This reflects significant and consistent
improvement in take-up of shifts with commitment from the spectrum of clinicians
working within AUCS.  In previous years this was as low as 43% at times. 
The strengthened senior management workforce along with a wider multi-disciplinary
team approach to deliver core urgent care services to patients is now fully embedded
within the service.   
4.3 Legal 
None. 
4.4 Equality/Socio-Economic 
Changes to how urgent care services are accessed may positively impact patients who
have reduced mobility or multi co-morbidities where travel can be difficult as there will
not be a need to travel, and the infection risk will be reduced.   Current and future users
of urgent care will continue to access all services through NHS 24 / 111 route.  This
will ensure patients are seen in the right place with the right team at the right time.
56

Page 57

Access will remain unchanged for all emergency care needs and access to GPs will
remain unchanged.    
The suite of current and new pathways in response to emerging challenges and issues
allow for more seamless care by healthcare professionals for patients who try to
access urgent care rather than patients trying to navigate various systems or having
various ‘touch points’ across the system. 
4.5 Risk 
Like most other NHS Boards, the ability to fill sessional GP shifts remains a consistent
risk to service delivery. By utilising a multi-disciplinary clinical team providing OOH
services along with the recruitment of GPs with Extended Roles who work between
primary and urgent care, this core workforce mitigates the risk of solely using sessional
GPs. 
There is a risk to the future of the FNC model and impact on the hospital front doors if
sustained funding can’t be identified.   
The AUCS OOH component of the service has seen an increase of 20% in activity and
there has been no update to core funding since 2016.  Demand and funding associated
to match clinical capacity will require close monitoring on an ongoing basis. 
4.6 Community Wealth Building 
The wellbeing of people and communities continues to be core to the aims and
successes of Community Planning.  Ensuring we deliver the right care in the right place
at the right time, is an integral part of the Wellbeing Delivery Plan, Integration
Authorities Strategic Commissioning Plan of both the NHS and Council, will contribute
to support this wellbeing agenda. 
4.7 Key Priorities 
The strategy and programme outlined in this report will assist the IJB to deliver the
following Strategic Objectives from the North Ayrshire HSCP Strategic Plan to: 
• Provide early and effective support
• Improve mental and physical health and wellbeing
• Develop and support our workforce 
The learning to date offers important opportunities seen in the context of the aim of the
Caring for Ayrshire programme which is to design a fully integrated system wide
approach to ensure people are able to access the right care at the right time in the
right place.   
57

Page 58

5. CONSULTATION 
5.1 NHS Ayrshire & Arran has an ongoing commitment to engage with the public through
television, radio and social media as well as in a range of community venues.  AUCS
will continue to participate in appropriate platforms and events to publicise how to
access pathways available within AUCS and ensure that people are supported to
access the right care at the right time at the right place. 
AUCS will continue to actively engage with and seek the assistance of the wider
services with pathway design and expand the use of the FNC as a central hub. The
management team is fully engaged with the National Urgent and Unscheduled Care
Collaborative and work continues to respond to emerging barriers and challenges to
the citizens of Ayrshire and Arran. 
Debbie McGill
Head of Primary and Urgent Care Services
Debbie.McGill@aapct.scot.nhs.uk 
11 September 2025 
58

Page 59

Integration Joint Board
25 September 2025
Subject : North Ayrshire HSCP & ADP
Annual Performance Management Report – 2024/25
Alcohol and Drugs 
Purpose : To present the annual performance information in relation to the
partnership’s Alcohol and Drug services.  This report is for :-
• Awareness 
Recommendation : IJB are asked to note the content of the report. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required √
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
HSCP Health and Social Care Partnership
ADP Alcohol and Drug Partnership 
1. EXECUTIVE SUMMARY 
1.1 To present the annual performance report for North Ayrshire Health and Social Care
Partnership (HSCP) for the period April 2024 to March 2025. 
2. BACKGROUND 
2.1 The annual report (please refer to Appendix 1) provides detailed information related
to alcohol & drug related performance management targets, standards and outcomes. 
3. PROPOSALS 
3.1 IJB are asked to note performance in relation to :-
• Access to Treatment Waiting Times;
• Alcohol Brief Interventions;
• Substance Use Target;
• Naloxone supply;
• Drug Related Deaths;
• Prevention & Service Support delivery;
Agenda Item 7
59

Page 60

• Information Management and Technology information;
• Medication Assisted Treatment improvements;
• Residential Rehabilitation;
• Experiential feedback;
• Human Rights Based approach;
• The Alcohol and Drug Partnership (ADP) annual report and engagement with
Healthcare Improvement Scotland regarding a new Residential Rehabilitation
Improvement Action Plan 
• Finance. 
3.2 Anticipated Outcomes 
Assurance regarding all key performance management information. 
3.3 Measuring Impact 
All targets, standards and outcomes are monitored and evaluated with any learning
implemented via quality improvement methodology. 
4. IMPLICATIONS 
4.1 Financial
None 
4.2 Human Resources
The ADP works across agencies with a wide range of staff 
4.3 Legal
None 
4.4 Equality/Socio-Economic
Equality Impact Assessments are carried out where required.   
Services have used a human rights based approach to service development and
improvement utilising the following: 
PANEL principles (a framework for applying a human rights-based approach in
practice, emphasizing Participation, Accountability, Non-Discrimination,
Empowerment, and Legality) 
FAIR model (a practical framework which focuses on understanding the facts,
analysing rights at stake, identifying responsibilities, and reviewing actions) 
AAA approach (a framework focusing on the Accessibility, Availability, and
Appropriateness of services and resources, particularly in the context of public
health and well-being).  
60

Page 61

4.5 Risk
Risk assessments are completed as and when required – Low risk grading with regard
to the information contained within this report. 
4.6 Community Wealth Building
Improvements will increase community confidence in partnership approaches and
raise awareness of the impact of alcohol and drugs and the work of the ADP to reduce
and drug related harms. 
4.7 Key Priorities
Actions and improvements link directly with Ministerial Priorities to support the delivery
of local strategic and operational plans across statutory and partner services and
support wider actions to prevent drug related deaths in line with the National Mission. 
5. CONSULTATION 
Service users, families and staff from across a variety of services have contributed to
the achievement of targets, standards and outcomes 
Caroline Cameron, Director 
Peter McArthur, Senior Manager, Alcohol & Drug Services.   
01294 317840, peter.mcarthur@aapct.scot.nhs.uk 
Appendices
• Appendix 1  
North Ayrshire HSCP & ADP, Performance Management Report Alcohol and Drug
information (1st April 2024 to 31st March 2025)
61

Page 62

1 
NORTH AYRSHIRE HEALTH & SOCIAL
CARE PARTNERSHIP and the ALOCHOL
& DRUG PARTNERSHIP 
Performance Management Report 
Alcohol and Drug information 
April 2024 – March 2025
Prepared by Denise Brown
Prevention and Service Support Team 
62

Page 63

2 
NORTH AYRSHIRE ADP WAITING TIMES 
April 2024 – March 2025 
Alcohol
• 90% of clients will wait no longer than 3 weeks from referral to appropriate alcohol
treatment that supports their recovery   
• 100% of clients will wait no longer than 6 weeks from referral to appropriate alcohol
treatment that supports their recovery 
Drug
• 90% of clients will wait no longer than 3 weeks from referral to appropriate drug
treatment that supports their recovery   
• 100% of clients will wait no longer than 6 weeks from referral to appropriate drug
treatment that supports their recovery   
Target achieved 
Q1 Q2 Q3 Q4
97% 100% 96% 98%
Q1 Q2 Q3 Q4
100% 100% 100% 100%
Target achieved 
Q1 Q2 Q3 Q4
100% 99% 100% 100%
Target achieved 
Q1 Q2 Q3 Q4
100% 100% 100% 100%
Target achieved 
63

Page 64

3 
ALCOHOL BRIEF INTERVENTIONS (ABI)
Ayrshire and Arran wide information 
Annual report:  April 2024 – March 2025 
Annual target set by Scottish Government in priority settings (2024/25) – 3420 
Total ABI delivery in priority settings (as at 31/03/2025) – 5940 
Annual target set by Scottish Government in wider settings – 855 
Total ABI delivery in wider settings (as at 31/03/2025) – 1325 
Note – national reporting on ABI is currently paused.  Awaiting further national guidance. 
SUBSTANCE USE TREATMENT TARGET 
In 2022, the Scottish Government have created a new ‘Substance Use Treatment Target’ to
increase the number of individuals being supported in treatment.   
North Ayrshire had been set a target to increase numbers in treatment from 882 individuals in April
2020 to 959 individuals by March 2024.  This was exceeded.
In 2025, no new specific target has been set.  As we await further national guidance, the
expectation is for services to continue to support as many people into treatment as possible.
Baseline from Scottish Government   2022-2025 quarterly reporting 
East North  South 
01/04/2020 –
31/03/2021
946 882 561 
Target by 2024 by Scottish Government 
East North  South 
1029 959 610 
Interventions are in place across our community
alcohol and drug recovery services to support the
achievement of this target. Please note the monthly
information supplied is unpublished and has been
collected from local prescribing systems to monitor
progress.
Quarterly period  Target  Actual
Apr-Jun 22 891 898
Jul-Sep 22 900 940
Oct-Dec 22 910 974
Jan-Mar 23 920 1011
Apr-Jun 23 930 1051
Jul-Sep 23 940 1080
Oct-Dec 23 950 1103
Jan-Mar 24 959 1129
Apr – Jun 24 NA 1152
Jul – Sep 24 NA 1178
Oct – Dec 24 NA 1192
Jan – Mar 25  NA 1220
Total 3 Year Increase
Figure for IA
77 338
Target achieved 
Target achieved 
64

Page 65

4 
This report outlines Naloxone kits supplied in the community and reported through
the Shared Addictions Management System (SAMS) 
Locality  Q1 Q2 Q3 Q4 Total 
North  210 162 136 233 741
East  68 95 89 121 373
South  72 90 109 168 439
HMP
Kilmarnock
29 18 19 21 87 
**North Ayrshire have set a target of 480 kits, as a minimum, to be supplied during
2024/25** 
Ayrshire and Arran 
Quarterly Naloxone Report 
1st April 2024 – 31st March 2025
Total Naloxone kits
1640
426 Prenoxad 
+
1214 Nyxoid kits 
65

Page 66

5 
Demographics
70% 30%
Gender*
*Where this
data was
recorded
Who supplied the kits?
Age* 
Scottish Families supply kits to
Ayrshire and Arran residents via
their ‘Click and Deliver’ service. 
207 kits were delivered within
this reporting period.
2%
22%
40%
26%
10%
25 and under 26 - 35
36 - 45 46 - 55
56+
Who received the kits?
*Where this
data was
recorded
139
394
256
27
266
8
24
31
34
87
139
13
6
121
15
47
33
EA RADAR service
NADARS
START
Ward 5
PSST
Homeless Nurses
We Are With You South Ayrshire
We Are With You East Ayrshire
Turning Point Scotland (P.E.A.R)
HMP Kilmarnock
South Ayrshire ADP
EA Single Point of Access
Alcohol and Drug Liaison Team
North Ayrshire ADP
NA H&SCP (Kirsty Gibson)
East Ayrshire Recovery Matters
Harbourside (Pan Ayrshire)
66

Page 67

6 
There was a minimum of 73 lives saved
through community Naloxone use in
Ayrshire within this reporting period.  Many
saves go unreported. 
Save story - “Residents had alerted staff that the individual was unresponsive in his
wheelchair outside. Staff moved him to the reception area onto the floor and administrated naloxone.
An ambulance was called, and staff were informed that he had used Heroin, Valium & Alcohol. He
was transported to hospital” 
Saves
Number of reports of Naloxone uses in the
community to reverse overdose 
Education 
70 individuals
completed the Naloxone
Learnpro module
1225 individuals
received overdose
awareness training
428 individuals attended a
PSST virtual or face to
face Naloxone awareness
course
9 Training for trainers’
sessions were delivered 
Lives saved
67

Page 68

7 
AYRSHIRE AND ARRAN DRUG RELATED DEATHS INFORMATION 
2024 annual summary report 
National Records for Scotland - Drug Related Deaths 
In September 2025, the National Records of Scotland published its annual report titled ‘Drug
Related Deaths in Scotland 2024’.  1,017 people across Scotland died from a Drug Misuse
Death (DMD) in 2024, a decrease of 13% (155 deaths) compared with 2023.  Ayrshire and
Arran Health Board saw a decrease of DMDs last year, from 83 deaths in 2023 to 64 deaths
in 2024.  North Ayrshire saw a decrease from 36 deaths in 2023 to 23 deaths in 2024. 
Published confirmed deaths: 
East North South Total
2019 41 41 26 108
2020 36 39 31 106
2021 38 39 23 100
2022 30 37 15 82
2023 31 36 16 83
2024 21 23 20 64 
Locally services monitor and report all suspected DMDs, with the number being confirmed
nationally through verification of the cause of death, hence there is a delay in confirmation of
the verified number of DMDs each year. 
Sadly in the first 6 months of 2025, the locally reported number of suspected (but unverified)
DMDs, exceeds the total number of verified DMDs for 2024.  Public Health have issued
communications in partnership with the ADPs that this may be linked to the presence of
Nitazines, a synthetic form of heroin, in the illicit drug supply in Ayrshire.  The ADP are
working alongside Public Health and addictions services to help reduce risk and harm, with a
focus to refreshing our actions to reduce the number of deaths in North Ayrshire. 
These include but are not limited to:
• Continued delivery of the Medication Assisted Treatment (MAT) Standards
• Ensure quick access to MAT support (during 2024, the time from point of referral to
receiving prescribed medication was 1 day) 
• Continue to prioritise Blood Borne Virus (BBV) testing, Harm Reduction interventions
and mental and physical health assessment and support
• Ensure access to staff with lived experience to provide person centred recovery
support. 
• Promote family involvement and offer housing, welfare and advocacy support
• Continue to meet and exceed all local and national ‘access to treatment’ waiting
times’ targets and standards.
• Increase the number of individuals being supported to access Ward 5, Woodland
View and external residential rehabilitation support
• Continue to offer increased choice across the various Opiate Substitution Therapy
medications 
Please follow this link to access the report: : Drug-related deaths in Scotland, 2024 - National Records
of Scotland (NRS) 
68

Page 69

8 
PREVENTION AND SERVICE SUPPORT TEAM 
Annual summary report:  1st April 2024 – 31st March 2025 
Alcohol & Drug 
training and education sessions 
Calendar courses with
815 participants
Additional Training
Requests (ATR) with
3137 participants 
135 
102 
Training Delivery 
The team continue to provide a wide range of
education and training initiatives which focus on
improving awareness, competence and knowledge of
those affected by alcohol and drug use, and those
working in the field.  Due to the COVID-19 pandemic
the team introduced virtual training; this continues to be
offered as well as face to face training.  PSST currently
issue upcoming training courses on a quarterly basis.   
What did our participants say? 
"Loved the whole training, being provided with real life
examples is also beneficial"
“Enjoyed all of it. It was very well put together; confident
presenter made it interesting and maintained people
interest”
"I have gained knowledge on females and why they
take drugs/don't stop some of the barriers to sustaining
treatment. This will help me going forward with
volunteering with the end goal of getting employment
and working closely with females” 
“I enjoyed everything about the session, I felt the trainer
was very informed on the subject matter and this in turn
made it an enjoyable training session” 
“Both trainers were very knowledgeable and delivered
the content well. It was clear and concise, and the
interactive elements kept you engaged" 
52 sessions delivered
within Ward 5 
Attended 11
stalls/events 
Additional training requests and health
information events by locality area 
Alcohol Brief Interventions  
Annual target set by Scottish Government in priority settings (2023/24) – 3420
Total ABI delivery in priority settings (as at 31/03/2024) – 5940 
Annual target set by Scottish Government in wider settings – 855
Total ABI delivery in priority settings (as at 31/03/2024) – 1325 
Follow our social media pages to keep up to date with
our activities in the Prevention and Service Support
Team
Prevention and Service
Support Team – NHS
Ayrshire and Arran 
@PSST_NHSaaa
29%
37%
11%
23%
East North South Pan-Ayrshire
69

Page 70

9 
Ayrshire College 
Alcohol and Drug Liaison Officer 
146 workshops were
delivered to 1746 students 
46 1-1 supports with
students
5 staff supports  
7 health events with an
estimated 590 contacts 
Naloxone  
70 staff completed the
Naloxone Learnpro module
Minimum of 73* lives saved in
the community
*lives saved across Ayrshire and Arran as reported on
the Shared Addiction Management System (SAMS). 
Many saves go unsupported. 
9 Train the trainer sessions
delivered 
35 Naloxone awareness
sessions delivered  
Service Support  
Service Support facilitate service
development activity which supports the
implementation and delivery of the quality
improvement agenda for Alcohol and Drug
Services which meets national, local and
strategic objectives. 
15 Audit and evaluation activity
9 Guidelines reviewed and updated 
Get our NHS Ayrshire and Arran 
Alcohol and Drug App
Download the NHS Ayrshire & 
Arran app from your Apple or 
Android app store. Then search for 
Alcohol and Drugs.
28 Drug and Alcohol groups 
supported  
Support to
implementation of
MAT standards
and reporting
Support to development
of local pathways and
operational procedures
Gathering, collating
and presenting
client satisfaction
and client stories
ABI Heat Standard
recording and
reporting 
Support to START
and RADAR service  Support to local
Adverse Incident
review processes
and reporting 
70

Page 71

10 
INFORMATION MANAGEMENT AND TECHNOLOGY (IM&T)
Annual summary report:  1st April 2024 – 31st March 2025 
The Information Management and Technology Team are responsible for the
development, training and monitoring of the Shared Addiction Management System
(SAMS) and the training and monitoring of Drug and Alcohol Information system (DAISy). 
These systems are used to record drug and alcohol information, which enables the team
to provide national and local reports.
SAMS updates 
Admin section on SAMS being updated
Substitute Prescribing Change Sheet
added to SAMS
Physical Health section on SAMS was
updated.
Ongoing updates to Substitute
Prescribing Application.
DAISy support 
• Attendance at various DAISy workshops
and training
• DAISy Quality Checks, Reports and
Updates
• Working with PEAR to ensure accuracy on
DAISy.
Training 
• 50 individuals received SAMS training 
• 54 individuals received DAISy training
Support 
Approximately 50 SAMS/ DAISy
support calls per month 
IM&T are also responsible for the
collation and reporting of Drug Related
Deaths and the completion of the
National Drug Death database. 
Drug related death reporting  
Reporting  
• Quarterly reports including ASPIRE report, (29 individual performance reports),
Naloxone quarterly reports, Scottish Governance reports, ADP reports and local
performance and planning reports 
• Development of reports and audits for MAT standards and submission of MAT 1 –
10 numerical data 
• Monthly reports including 10 current OST reports, MAT Target Report, SAMS Data
Quality Reports and Psychological Therapy Waiting Times
• Weekly DAISy quality data checks for Waiting Times, Assessments and Reviews
for all Alcohol and Drug services 
• Monthly substitute prescribing audit 
• Drug related death report 
• Various pan-ayrshire residential rehab reports 
• Approximately 10 – 15 ad hoc report requests per month
71

Page 72

11 
IMPLEMENTATION OF MAT STANDARDS WITHIN NORTH
AYRSHIRE                    Annual summary report 2024 - 25
In April 2021, the Scottish Government introduced 10 new Medication Assisted Treatment (MAT)
Standards for implementation by Alcohol and Drug Services.   There is evidence that rapid access to
MAT meets the needs of highly vulnerable groups and reduces mortality1, therefore new approaches
were required within North Ayrshire to support rapid access to MAT:
• A local test of change was carried out to evaluate the new model of care to establish effectiveness 
prior to roll out  
• An Improvement Implementation Plan, was implemented, evaluated & updated with regular progress
reports submitted to the Scottish Government.
• Quarterly Updates on MAT developments were submitted to the national MAT support Team – MIST.
•  An explicit delivery plan was put in place for delivering trauma informed practice.
• Guidelines and clinical & care pathways of support were put in place to ensure consistency and     
support the staff to deliver the interventions. 
Results/outcomes (2024/25)
• Improvement in the waiting time from referral to commencement of appropriate Opiate Substitution 
Therapy medication - 75% of individuals were offered a first MAT assessment on the same day as 
engagement with the service (improvement from previous year)
• 100% of individuals were supported to make an informed choice on MAT medication and the 
appropriate dose
• 75% of notified high risk events to the multi-agency assessment team for assertive outreach were 
contacted on the same day (improvement from previous year)
• 86.49% of individuals were retained in service for more than 6 months (improvement from previous 
year)
• 186 individuals have shared care with Primary Care (improvement from previous year)
• 100% of individuals received a mental health assessment 
• 100% of individuals were offered BBV testing, Harm Reduction interventions and a physical health 
assessment 
• Improvement in satisfaction and experience of clients (improvement from previous year) 
A RAGB self-assessment was completed, and evidence (numerical, experiential and process
information) was submitted to the MIST team for analysis and benchmarking. The table below highlights
a very positive final RAGB score for the implementation of MAT standards 1 - 10 across North Ayrshire 
Plan during 2025/26
• Sustain a green RAG rating for standards 6 to 10
• Move to a RAG rating of blue during the next year for MAT Standards 1 to 5 (as the definition of a final blue RAG rating
is to be able to evidence 2 years of sustained implementation of a green RAG rating and evidence of benefit to people
plus ongoing monitoring of the standard across all MAT services)
72

Page 73

12 
RESIDENTIAL REHABILITATION EXPANSION 
• Ward 5 - Access to residential support across Ayrshire and Arran 
Ward 5 has 10 beds for residential care: 
Seamless pathways of support are in place with the local community team supporting individuals
before, during and after their placement (extra support in place for NA residents e.g. in addition
to ongoing NADARS support, everyone is also provided with daily follow up support from the
P.E.A.R service for the first week following discharge).
During 2024/25 
• Access to additional local residential rehabilitation Harper House
The NA H&SCP was instrumental in supporting Phoenix Futures, Scotland, to open ‘Harper
House’ in November 2022. It is located in Saltcoats and is a Care Inspectorate registered
service, funded by the Scottish Government – it offers specialist support for the ‘whole family to
recover from the harms of problematic drug and alcohol use’. Their family-focused programme of
interventions is ‘designed to benefit each member of the family and the family unit as a whole’.
Referrals are accepted from across Scotland, with enhanced local access available for residents
of North Ayrshire. These pathways continue to be improved with a local oversight group meeting
regularly to support the identification and suitability of families. In 2024/25 NADARS supported 3
applications into Harper House with all 3 starting the programme. Additionally NADARS
supported 4 families who relocated to North Ayrshire from other areas in Scotland following
completing the Harper House residential programme 
• Access to External Residential Rehabilitation (ERR) 
Individuals wishing to access external residential rehabilitation support can do so via NADARS
who will support the development of a care plan, identify a residential rehabilitation provider,
seek funding and then support individuals into, through and after their external residential
rehabilitation placement. In 2024/25, 57 referrals were received for ERR. Following assessment,
16 individuals were suitable for ERR and funding was approved, 41 individuals were not suitable
or declined further ERR intervention at this time and were offered alternative community
supports. 10 individuals commenced ERR with 9 completing the agreed programme. 
5  5 
Detoxification Rehabilitation 
135 individuals 
(NA = 72)
87 individuals 
(NA =51)
Detoxification support Rehabilitation support
73

Page 74

13 
Utilising client and family/carer feedback for
continuous service improvement within North
Ayrshire Drug and Alcohol Recovery Service
(NADARS)
A robust process is in place within NADARS to gather client and family/carer feedback within
the service.  Feedback is collected via various methods, such as: 
• Structured questionnaires for clients/family/carers
• Attendance at focus groups
• Formal comment cards – client and family/carer
• Remote feedback tools such as the NHS Ayrshire and Arran Alcohol and Drug App
• External platforms such as Patient Opinion 
• Unsolicited feedback such as thank you cards and letters
Feedback is collected throughout the financial year and collected by:
• Staff members gathering feedback from active clients within their caseload who they
have provided any treatment or support to within the reporting period
• Service Support staff attending various recovery groups within the community to
gather individual views on the service and ways in which it could be
improved 
• Service Support staff attending inpatient areas, such as Ward 5,
Woodland View to facilitate focus groups with individuals who are
currently receiving this service 
• Targeted approach feedback for specific interventions such as MAT Standards, Non-
Fatal Overdose pathways 
Prior to any intervention, individuals should be made aware how they can give feedback,
what the feedback will be used for and that the feedback provided will be anonymous when
written into feedback reports. 
Results provided via feedback are collated, analysed and shared via appropriate platforms
within the “you said, we did” format.  Any improvements identified for the service are
populated within a local improvement plan, evidenced appropriately and updated through the
continuous improvement cycle. 
ADP experiential feedback 
The MAT programme requires ADPs to gather experiential feedback to ensure that services
are responsive to the needs and experiences of individuals who are accessing them.  To
compliment existing data collection methods, semi-strucutred interviews are
carried out with individuals accessing services and lived and living experience
panels. Patient stories and short conversations are captured within clinical
settings to ensure real-time experiencies fit into service improvement.  A thematic analysis is
carried out on all data collected to identify areas of good practice, identify areas for
improvement and inform improvement plans for continuous service delivery 
74

Page 75

14 
Charter of Rights for People Affected by Substance Use 
The Charter of Rights has been created by individuals who are affected by substance use,
including family members and carers, service providers and national organisations. 
The charter aims to help people know their rights and to know what support they can expect
to receive. The Charter sets out some of the most important rights for people affected by
substance use. 
Right to life – everyone’s right to
life is protected by law. 
Right to the highest
attainable standard of
physical and mental
health – everyone has the right to get
health and care services that are
available, accessible, acceptable and
are of sufficient quality.  Everyone
should be treated fairly and equally,
without stigma and discrimination. 
Right to an adequate standard
of living - the right to adequate
food, clothing and housing with
the goal to keep people out of
poverty, ensure that their basic needs
are met and that they are able to take
part in the life of their community.
Right to private and family life -
Everyone has the right to
respect for their private and
family life. This protects people’s
dignity and right to make
decisions about their own life.
Right to a healthy environment - This
right means that you should
have access to clean, safe
air, water, land and soil free
from pollution. It also means
the place you live should make you feel
safe.
Freedom from torture
and other cruel,
inhuman & degrading
treatment or punishment - This right
protects people from treatment that
causes them a lot of pain, physical or
mental suffering or which makes them
feel worthless or hopeless. 
Freedom from arbitrary
arrest or detention -
People should not be
detained solely based on
their substance use.
Diversion from prosecution should be
prioritised for minor substance related
offences.
Advocacy 
Advocacy services
provide information,
support and
representation. Advocacy can support
you to get your voice, views and wishes
heard and explain more about your
rights.  
If you need support in North Ayrshire,
contact Voiceability on 0300 303 1660 or
visit www.voiceability.org/in-
scotland/northayrshire 
The full version of the
charter can be found by
scanning the QR code. 
75

Page 76

15 
Applying the FAIR model approach to MAT implementation in North
Ayrshire 
In order to provide continuous quality improvement and to align the implementation
of the MAT programme with the Charter of Rights for People affected by Substance
use. The FAIR model, AAAQ framework and Panel Principles were used to appraise
the experiential component of the standards. 
A more systematic analysis of the effectiveness of implementation was undertaken
using the AAAQ framework to ensure that services are provided in a way that
respects human rights and promotes equality.  AAAQ sets out the 4 essential
elements of the right to health: 
• Availability
• Accessibility 
• Acceptability 
• Quality
The PANEL priniciples framework was used to ensure that individuals rights were
central to policies and practices, the five key human rights principles underpinned by
the framework are:
Participation:  People should take part in decision making and have a voice. 
Policies and practice should support widespread participation.
Accountability: Organisations and people are accountable for realising human
rights
Non-Discrimination and Equality:  Everyone has the same rights (regardless of
their ethnicity, gender, income, religion etc)
Empowerment:  People, communities and groups should have power.  They need
to know and claim their righs in order to make a difference.
Legality:  Rights must be legally enforceable.  All decisions should comply with
human rights legal standard. 
In North Ayrshire the FAIR model approach has been carried against 6 of the 10
MAT standards with improvement actions identified. 
What is the experience of
individuals involved and
what are the important
facts to understand? 
FACTS 
ANALYSIS 
Analyse rights:  Develop an
analysis of the human rights
at stake.  Identify
responsibilities.   IDENTIFICATION
FAIR
REVIEW 
Identify what needs to be
done and who is
responsible for doing it  
Make recommendations for
action and later recall and
evaluate what has
happened as a result   
76

Page 77

16 
ADP Annual Reporting Survey to the Scottish Government
The ADP Support Team received, collated and submitted the annual reporting to
survey to the Scottish Government on the 13th June 2025. The report covered a
range of topics in relation to treatments services, residential rehab, support to
children and families, justice, and developing recovery communities. If anyone would
like more information on the reporting survey, please get in contact with the ADP
Support Team on: adp@north-ayrshire.gov.uk  
South West of Scotland Residential Rehabillitation Hub
North Ayrshire (NA) ADP have engaged with other local ADPs to be part of a South
West of Scotland collaborative with a focus on residential rehabilitation.  The NA
ADP, with support from Health Improvement Scotland (HIS) have completed a self-
assessment and have then developed an action plan to further improve our external
residential rehabilitation pathways and support.  The action plan aims to address four
high level themes:  
1. Certain demographics are disproportionately affected by substance use
2. Vulnerable communities have higher rates of unmet need in relation to
substance use
3. Lack of integration within the wider health and social care system means that
individuals do not receive the rights care at the right time to support their
recovery from substance use.
4. Detrimental effects on families/carers and friends in relation to (their loved
ones) alcohol and/or drug use.  
A working group has been formed to support the implementation of the action plan
over the next 2 years. The ADP, SMT and IJB will receive a progress report at the
end of year 1. 
77

Page 78

17 
FINANCIAL INFORMATION 
ADP 24-25 Forecast Spend   
78

Page 79

18 
Additional funding streams 
Agreed Projects 
24/25
MAT Standards    £489,252.99 
Other Projects    £5,871.94 
Residential Rehab    £140,335.78 
Whole family Approach
framework    £109,763.46 
Grand Total    £745,224.17 
The ADP has accumulated a reserve balance due to underspend in previous
financial years. There are plans in place to utilise the reserves and they are
committed in future years.
79

Page 80

80

Page 81

Integration Joint Board
25 September 2025
Subject : North Ayrshire HSCP & ADP
Medication Assisted Treatment - Annual Report   
Purpose : To present the annual report in relation to the continued
implementation of the Medication Assisted Treatment Standards.
This report is for :-
• Awareness 
Recommendation : IJB are asked to note the content of the report. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required √
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
MAT  Medication Assisted Treatment
HSCP Health and Social Care Partnership
ADP Alcohol and Drug Partnership
RAG ‘Red, Amber & Green’ – scoring system 
1. EXECUTIVE SUMMARY 
1.1 To present the 2024 to 2025 annual report regarding the continued implementation of
the Medication Assisted Treatment (MAT) Standards. 
2. BACKGROUND 
2.1 The annual report (please refer to Appendix 1) provides detailed information relating
to implementation of the MAT Standards, achievements, outcomes and priorities for
the year ahead. 
3. PROPOSALS 
3.1 IJB are asked to note information in relation to :-
• Effects of change during the past year;
• Statistical data;
• Developments and future priorities;
Agenda Item 8
81

Page 82

• Experiential feedback;
• Benchmarking scoring tracker and RAG ratings;
• Plan for the year ahead. 
3.2 Anticipated Outcomes 
Assurance regarding positive progress in the delivery across all 10 MAT Standards. 
3.3 Measuring Impact 
All targets, standards and outcomes are monitored and evaluated with any learning
implemented via quality improvement methodology.  More detailed outcomes and
positive impact measures are evidenced via regular reporting to the Scottish
Government. 
4. IMPLICATIONS 
4.1 Financial
There is a risk of being unable to sustain implementation of MAT Standard 7 (Primary
Care) unless on-going funding can be identified (currently the ADP has provided non-
recurring funding to implement a new model of care which will be evaluated by March
2026). 
4.2 Human Resources
The implementation of the MAT Standards involves a wide range of staff across a
variety of partner organisations 
4.3 Legal
None 
4.4 Equality/Socio-Economic
Equality Impact Assessments are carried out where required.   
Services have used a human rights based approach to service development and
improvement utilising the following: 
PANEL principles (a framework for applying a human rights-based approach in
practice, emphasizing Participation, Accountability, Non-Discrimination,
Empowerment, and Legality) 
FAIR model (a practical framework which focuses on understanding the facts,
analysing rights at stake, identifying responsibilities, and reviewing actions) 
AAA approach (a framework focusing on the Accessibility, Availability, and
Appropriateness of services and resources, particularly in the context of public
health and well-being).  
82

Page 83

4.5 Risk
Risk assessments are completed.  
There is a Low risk grading with regard to full implementation of 9 of the 10 Standards.
There is a Medium risk grading with regard to the full implementation of MAT Standard
7 (Primary Care) due to the absence of recurring funding. 
4.6 Community Wealth Building
Improvements will increase community confidence in partnership approaches and
raise awareness of the impact of alcohol and drugs and the work of the ADP & HSCP
to reduce drug related deaths. 
4.7 Key Priorities
Actions and improvements link directly with Ministerial Priorities to support the delivery
of local strategic and operational plans across statutory and partner services and
support wider actions to prevent drug related deaths in line with the National Mission. 
5. CONSULTATION 
Service users, families and staff from across a variety of services have contributed to
the achievement of MAT delivery. 
Caroline Cameron, Director 
Peter McArthur, Senior Manager, Alcohol & Drug Services.   
01294 317840, peter.mcarthur@aapct.scot.nhs.uk 
Appendices
• Appendix 1  
Medication Assisted Treatment – Annual Report
83

Page 84

IMPLEMENTING MEDICATION ASSISTED TREATMENT (MAT) 
NORTH AYRSHIRE DRUG AND ALCOHOL RECOVERY SERVICE (NADARS) 
Reporting period: 1st April 2024 - 31st March 2025
Quality issue: In 2023, there were 1,172 drug related deaths registered in Scotland - 121 deaths higher than 2022.  Whilst
drug deaths in Scotland have been increasing over the last two decades, this is the second lowest number in the last six
years.  Ayrshire and Arran continues to have higher rates of drug deaths than the Scotland average. Evidence suggests quick
access to treatment is crucial and being in treatment can be a protective factor for majority of individuals. The Scottish Drug
Deaths Taskforce (SDDTF) has prioritised the introduction of the MAT standards to help reduce the number of drug related
deaths. There is evidence that rapid access to MAT meets the needs of highly vulnerable groups and reduces mortality.
Aim: To have no barriers to accessing treatment and care
that supports an individual’s recovery. This project
focussed specifically on improving access to appropriate
Medication Assisted Treatment (MAT) within the North
Ayrshire Drug & Alcohol Recovery Service (NADARS) in
order to prevent deaths, reduce harms and promote
recovery opportunities.
Effects of change during 2024/25:
• Improvement in the waiting time from point of referral to
commencement of appropriate Opiate Substitution Therapy
(OST) medication - average time from assessment to
prescribed medication - 1 day. 
• Increased choice in OST medications 
• Improvement in satisfaction and experience of clients. 
• All individuals received a mental health assessment and
support as required. 
• All individuals were offered Blood Borne Virus (BBV)
testing, Harm Reduction interventions, physical health
assessment and referred on for further support where
required. 
• All individuals had the opportunity to access Recovery
Development Worker's with lived experience to provide
person centred recovery support. 
• All individuals had the opportunity of family involvement. 
• All individuals were offered housing, advocacy support and
were referred for social care support where appropriate. 
Tests of change:
Cycle 1: Implement and test the MAT clinic pathway on a
Monday and a Thursday in one locality (Three Towns). 
Cycle 2: Secure funding to recruit staff to support the
implementation of the full model. 
Cycle 3: Refine project charter to facilitate full model 
Cycle 4: Expand service to 5 days per week across 6
localities of North Ayrshire (NA).
(Test of change is complete and now working towards
sustaining full model during 2025/26)
0
2
4
6
8
10
Average number of days from assessment to
prescription
Median = 1 day
0
5
10 Average number of days from referral to
prescription
Median = 1 day
84

Page 85

IMPLEMENTING MEDICATION ASSISTED TREATMENT 
IMPLEMENTING MEDICATION
ASSISTED TREATMENT
361 REFERRALS BY GENDER 
FEMALES               MALES 
127                    234         
(35%)                   (65%)                 
REFERRALS BY GENDER & AGE GROUP
0 20 40 60 80 100
0 - 24
25 - 34
35 - 44
45 - 54
55+
COMMENCED SAME DAY/NEXT DAY 
(where clinically safe and appropriate) 
93%                       
of clients commenced MAT                       
on same day or next day from                 
assessment 
INTERVENTIONS OFFERED AT POINT OF MAT
DELIVERY 
100%                            
of clients were offered Mental Health                     
Support and Harm Reduction                                                        
interventions BBV testing, 
IEP and Sexual Health 
331 individuals chose this pathway of MAT
related support.  The reasons given for not
commencing the pathway were:
• clients went to prison 
• not ready to commence MAT but
continued to receive support from the
wider service 
NALOXONE AND OVERDOSE
AWARENESS   
100%  65%* 
of clients were       of clients were supplied
offered Naloxone    with Naloxone or already                                            
had a kit                             
*The remaining 35% declined* 
CLIENT SATISFACTION 
Of clients rated their initial waiting time either
“excellent” or “very good” 92%
100%
Of clients rated the communication from
NADARS either “excellent” or “very good”
Of clients who were able to commence
medication at their initial appointment stated
that there were no delays in getting their
prescription
100%
100%
Of clients felt that they were given sufficient
information to make an informed choice on
their treatment options
100%
Of clients felt that the NADARS worker
explained all the care and treatment options in
a way that they understood 
92% Of clients rated the overall service either
“excellent” or “very good” 
OPIOID SUBSTITUTION THERAPY (OST)
MEDICATIONS PRESCRIBED
FOLLOWING ASSESSMENT 
48%     44%     8%    
Methadone      Espranor/          Buvidal                            
Suboxone 
This evidences increased patient choice of OST
85

Page 86

IMPLEMENTING MEDICATION ASSISTED TREATMENT 
Developments during 2024/25:
• Quarterly reports have been submitted to the Scottish Government evidencing progression across each
of the 10 standards from the previous year.  
• An explicit delivery plan was put in place for delivering trauma informed practice
• LOPs, SOPs, guidelines and clinical & care pathways of support were reviewed & updated 
• MAT availability was increased at Caley court and expanded to 5 days per week.  MAT is now available
across all 6 localities with immediate support available to all from Caley Court alongside remote (low
threshold) access in more rural areas including the islands.
• 186 individuals currently have ‘shared care’ support with Primary Care colleagues (increase of 95 from
the previous year). 
• 126 referrals were made to advocacy for support from North Ayrshire substance use services (highest
referring ADP across Scotland)
• A workforce training plan is in place to ensure all staff offering MAT & OST can provide the core harm
reduction services at the same time and place as MAT delivery
• A robust wide reaching experiential process was implemented by the NA ADP, to capture, analyse and
utilise feedback from clients, families and staff to inform service improvement
• Appropriate recording information systems were updated to collect and analyse data
• In the absence of additional national funding being able to be accessed, the NA ADP committed non-
recurring funding to implement initial MAT 7 (Primary Care) developments at pace. 
• A new staff guidance document was approved for implementation to provide an ‘interface protocol’ as to
how secondary care mental health services & alcohol & drug services can better support individuals with
co-occurring mental health and alcohol and/or drug use.
• A human rights based approach has been carried against 6 of the 10 MAT standards with improvement
actions identified. 
Priorities for 2025/26
• Sustain a ‘solid green’ RAG rating for standards 6 to 10
• Move to a RAG rating of ‘blue’ during the next year for MAT Standards 1 to 5 (as the definition of a final
‘blue’ RAG rating is to be able to evidence 2 years of sustained implementation of a green RAG rating
and evidence of benefit to people plus ongoing monitoring of the standard across all MAT services)
• Conduct a local analysis of our experiential data to identify themes for further improvement.  
• Based on national feedback/approval we will update the NA MAT 7 model & explore options to secure
ongoing funding.
• Work underway, with all ADP partners, to scope out requirements and system change to support MAT
delivery for individuals using Stimulants and Benzodiazepines;
• Engage with service users, families and staff to evaluate and learn from the recently implemented MAT 9
related multi-agency ‘operational interface protocol’ to better support individuals presenting with co-
occurring mental health and alcohol and/or drug use 
INFORMATION AND FEEDBACK   
361 
referrals were received
between 1st April 2024 and
31st March 2025
331
clients commenced MAT support
(the others declined service,
required preparatory support or
disengaged from service)
93% 
of clients commenced MAT on the
same day or next day from
assessment (where clinically
appropriate and safe)
126 
individuals were referred for
and received Advocacy
support
Reasons for timescales over 7 days
include initial non- attendance with
follow up in place, required
additional preparatory support 
Detailed numerical data on referrals,
timescales, interventions etc was
submitted to MIST in April 2025,
which is now being analysed to
identify good practice and learning. 
86

Page 87

IMPLEMENTING MEDICATION ASSISTED TREATMENT 
EXPERIENTIAL FEEDBACK 
• To gather feedback and data in a consistent and impartial way, the ADP adopted a
multidisciplinary approach by identifying a mixture of service staff and individuals with Lived &
Living Experience (LLE) to gather experiential feedback from service users, families/carers of
people on MAT, and staff delivering the service. 
• Individuals identified to carry out the interviews attended a 3-session training course delivered
by MIST (national MAT Implementation Support Team).
• A mixed methods approach was applied to gather data e.g. 1-1 interviews, smaller engagement
events.
• The ADP Support Team collated, analysed, and themed the data for submission to MIST (with
full involvement of the Experiential Engagement Team and people with LLE). 
The feedback received was mainly positive and demonstrates the ease of access, increased choice of
medications and no barriers to the overall support received. 
“They made me aware of the different choices...The prescriber fully explained each option to me and
the pros/cons of each medication” 
“We spoke about all the available options to me, and I felt well informed”
MIST BENCHMARKING 2025 – SCORING TRACKER 
Plan during 2025/26
• Sustain a ‘solid green’ RAG rating for standards 6 to 10
• Move to a RAG rating of ‘blue’ during the next year for MAT Standards 1 to 5 (as the definition of a final
blue RAG rating is to be able to evidence 2 years of sustained implementation of a green RAG rating
and evidence of benefit to people plus ongoing monitoring of the standard across all MAT services) 
IMPLEMENTING MEDICATION ASSISTED TREATMENT
87

Page 88

88

Page 89

Integration Joint Board
25th September 2025
Subject : 2024/25 Audited Annual Accounts
Purpose : The Board is required to approve the audited annual accounts for
2024-25 for issue and to consider the report from External Audit. 
Recommendation : That the Board:
(a) Note that Audit Scotland have completed their audit of the
annual accounts for 2024-25 and have issued an unqualified
independent report auditor’s report; and
(b) Approve the Audited Annual Accounts to be signed for
issue. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership 
1. EXECUTIVE SUMMARY 
1.1 The Integration Joint Board (IJB) was required to produce a set of annual accounts
for 2024-254. These accounts were produced within the statutory timescale and have
been subject to independent audit by the Integration Joint Board’s external auditors,
Audit Scotland. 
1.2  The external auditor is required to report on certain matters arising to those charged
with governance in sufficient time to enable appropriate action to be taken before the
financial statements are approved and certified. The audit process has been
completed and Audit Scotland have issued an unqualified independent auditor’s
report. 
1.3  As part of the independent audit there were some minor presentational changes
required and these have been updated in the final accounts. There are no changes to
the overall financial position reported to the Performance and Audit Committee in
June.    
Agenda Item 9
89

Page 90

2. BACKGROUND 
2.1 The Integration Joint Board is subject to the audit and accounts provisions of a body
under section 106 of the Local Authority Government (Scotland) Act 1973. This
requires annual accounts to be prepared with the reporting requirements specified in
the relevant legislation and regulations. The requirements are proportionate to the
number of transactions of the Integration Joint Board whilst complying with the
requirement for transparency and true and fair reporting in the public sector. 
2.2 The audited annual accounts have been prepared in accordance with the Code of
Practice on Accounting for Local Authorities in the United Kingdom 2024-25.
Additional guidance was issued by the Scottish Government Integrated Resources
Advisory Group (IRAG) and CIPFA LASAAC and this guidance has been followed to
produce the unaudited accounts. 
2.3 The Audited Annual Accounts for 2024-25 are included as Appendix 1, these
incorporate the independent auditors report. Audit Scotland are able to conclude that
the Integration Joint Board’s accounts present a true and fair view of the IJB’s financial
position. 
2.4 Appendix 2 includes a letter of representation signed by the Head of Service (Finance
and Transformation) as responsible officer. Audit Scotland’s External Audit Annual
Audit Report to members, which summarises the findings of the audit, is a separate
item on the agenda. 
2.5 Audit Scotland have given an unqualified opinion that the 2024-25 financial statements
give a true and fair view of the financial position and expenditure and income of the
IJB for the year, concluding that the accounts have been properly prepared in
accordance with relevant legislation, applicable accounting standards and other
reporting requirements. The overall financial position remains as reported to the
Performance and Audit Committee in June 2025. 
2.6 The Integration Joint Board are required to formally approve the Audited Annual
Accounts and thereafter they will be published on the partnership website. 
3. PROPOSALS 
3.1 The Board is invited to: 
(a) note that Audit Scotland have completed their audit of the annual accounts for 
2024-25 and have issued an unqualified independent auditor’s report; and
(b) approve the Audited Annual Accounts to be signed for issue. 
90

Page 91

3.2 Anticipated Outcomes 
The annual accounts are a key statutory reporting requirement and can be a useful
way to join up financial and service delivery performance information in a readily
available public document. 
3.3 Measuring Impact 
Progress against the recommendations will be reviewed by the Performance and Audit
Committee during 2025-26. 
4. IMPLICATIONS 
4.1 Financial
The IJB are required to consider and approved the Audited Annual Accounts for 2024-
25.
4.2 Human Resources
None.
4.3 Legal
None.
4.4 Equality/Socio-Economic
None.
4.5 Risk
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
4.6 Community Wealth Building
None.
4.7 Key Priorities
None.
5. CONSULTATION 
5.1 The unaudited annual accounts were advertised and made publicly available for
inspection. There were no objections noted from the public inspection. 
The Chief Officer, Chief Finance Officer and other officers of the IJB have been
consulted during the audit process as required.
Caroline Cameron
Director, Health and Social Care Partnership 
For more information please contact Eleanor Currie (Principal Manager, Finance/ Chief
Finance Officer) (eleanorcurrie@north-ayrshire.gov.uk) 
91

Page 92

Appendices
• Appendix 1, Audited Annual Accounts 2024-25
• Appendix 2, Letter of representation 
92

Page 93

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              1 
North Ayrshire Integration Joint Board
Annual Accounts for the period ended
31 March 2025  
93

Page 94

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              2 
Table of Contents
Management Commentary 3
A snapshot of achievements during 2024-2025 7
Organisational Performance 12
Annual Accounts 16
Statement of responsibilities 33
Responsibilities of the Chief Finance Officer 34
Annual Governance Statement 35
Remuneration report 44
Financial statements 46
Notes to the financial statements 49
Glossary of Terms 59
Independent auditor's report 59 
94

Page 95

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              3 
Management Commentary
This publication contains the Annual Accounts of North Ayrshire Integration Joint Board (IJB) for
the period ended 31 March 2025.
The Management Commentary outlines the key messages in relation to the IJB’s financial
planning and performance for the period 2024-2025 and how this has supported delivery of the
IJB’s strategic priorities.
This commentary also looks forward, outlining the future financial plans for the IJB and the
challenges and risks that we will face as we strive to deliver services that continue to meet the
needs of the people of North Ayrshire.
North Ayrshire IJB
North Ayrshire Council, alongside East and South Ayrshire Councils and NHS Ayrshire and Arran
established the 3 Ayrshire Integration Joint Boards on 1 April 2015. The purpose of an IJB is to
improve the health and wellbeing of local people, create support within our communities and
deliver joined-up care pathways for people who use health and social care services, particularly
those who have complex care needs.
North Ayrshire Council and NHS Ayrshire and Arran delegate responsibility for the planning of
community health and care services to the IJB. The IJB commissions services and staff from the
Council and NHS and is responsible for the operational oversight of integrated services. The Chief
Officer of the Health and Social Care Partnership is responsible for the operational management
of integrated services.
North Ayrshire Health and Social Care Partnership (NAHSCP/the Partnership) is the service
delivery organisation for functions delegated to the IJB, which is comprised of staff from both
North Ayrshire Council and NHS Ayrshire and Arran, though sits as its own organisation for
carrying out these delegated functions together.
The Chief Officer is supported by heads of service for each service area, including the statutory
roles of the Chief Finance Officer and Chief Social Work Officer, and the wider partnership
management team. 
NAHSCP senior management structure 
95

Page 96

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              4 
Strategic Commissioning Plan
Each Health and Social Care Partnership produces a strategic plan for carrying out integration
functions over the plan period. In April 2022 the Partnership published ‘Caring Together 2022-
2030’, which is the first long-term strategic commissioning plan published by the Partnership. 
It was developed using a local health and care needs assessment and a period of public
engagement, which took place online due to Covid-19 restrictions at the time. The Strategic
Planning Group and other key stakeholders were actively involved in the development of the plan,
reinforcing the partnership nature of local health and care services.
The Partnership undertook a review of its vision, values and strategic priorities, and agreed:
‘People who live in North Ayrshire are able to have a safe, healthy and active life’.
The values that people accessing Health and Social Care Services across North Ayrshire can
expect to experience: Care, Empathy and Respect.
In order to embody these values and achieve this vision, the plan sets out five strategic priorities: 
These priorities are interlinked, and by achieving them together, the partnership aims to achieve
its vision for and with the people of North Ayrshire.
Delivery of the Plan has included the development of enabling plans, including the Medium-Term
Financial Outlook, a Transformation Plan agreed in March 2024, a new Digital and Data plan
developed in 2024.
Refreshing the Plan
The current plan was developed to be a longer-term strategy in place until 2030. However, the
Partnership recognises the very different situation it is in since the plan was developed in 2021,
particularly in relation to finances, demographics, and the move from immediate covid recovery to
longer-term organisational recovery.
The Partnership is currently undergoing a programme of research to understand the current and
future needs of residents and service users, including a Strategic Needs Assessment, Review of
national and Local Policy, analysis of local engagement, and mapping of existing service.
Following the drafting of a new Strategic Plan, the Partnership plans to revise its Performance
Management Framework to ensure that the plan is being monitored effectively, and to revise its
Participation and Engagement Strategy to ensure that service reviews are informed by service-
users.
The refreshed plan will also reflect further work being carried out at a locality level to reflect the
differing needs of different communities across North Ayrshire.
96

Page 97

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              5 
Implementation of the strategic plan is key for the Partnership to achieve the nine National Health
and Wellbeing Outcomes as set by the Scottish Government, and refreshing the plan will ensure
our services are targeting our community needs.
More information about the current Strategic Plan 2022-2030 can be found at: NAHSCP Strategic
Commissioning Plan
North Ayrshire Today
North Ayrshire is home to a, estimated total population of 133,570 (NRS, 2023). The local area
covers approximately 885 square kilometres and has a population density of c.151 persons per
square kilometre.
The National Records of Scotland (NRS) provides a population projection estimate using 2018 as
a baseline year. Between 2013 and 2023 the population is estimated to have fallen from 137,100
to 133, 570, or 2.6% over the 10-year period. It also estimated that by 2043 it will fall to 122,334, a
further decrease of 8.4%, or an almost 11% decrease over the 30-year period. Not only is the
overall population projected to change, but the demographic spread is also projected to change
over time with a steady reduction in the working age population.
Current population estimates show that 60% of the population is aged 16-64 which is projected to
decrease to 54.1% in 2043. Conversely, the 65+ population is currently 24.2% and is expected to
rise to 30.7% in 2043 (NRS). This demographic change has significant implications for local
funding and spending as the number of working aged people paying taxes is decreasing, while the
number of dependents, and therefore pressure on our health and care services is increasing.
Currently, 29.1% of local people are known to have some form of long-term condition. It is
recognised that the prevalence of people with a long-term condition increases by age. For
example, 1.7 people in every 10 under the age of 65 has a long-term condition, whereas 8.7
people in every 10 over the age of 85 has a condition.
In contrast to the growth in the older population, the life expectancy figures for North Ayrshire
have dropped in recent years. To measure life expectancy, averages are taken over a 3-year
period, and for 2021-2023, female life expectancy was 79.3 years, compared to its highest point
over the previous 10 years of 80.99 in 2012-2014. Current male life expectancy is 74.9 compared
to its high of 76.47, also in 2012-14. For both females and males, life expectancy is lower when
compared to the Scottish Average.
In the latest time-period available (2019-2021), the average healthy life expectancy in North
Ayrshire was 56.51 years for men and 52.07 years for women. Healthy life expectancy data is only
available from 2015, and the highest for females was 57.13 in 2015-17, and for males was 58.52
in 2017-2019. For women, healthy life expectancy has been steadily falling, but for men it was
rising to that high point when it began to fall in recent years. 
When compared against life expectancy this suggests that, while women in general will live longer
than men, they will spend a greater proportion of their life in ill health. Additionally, in North
Ayrshire and nationally, over the last 20 years life expectancy for males has increased more than
for females, so the gap between life expectancy is gradually reducing over time. 
97

Page 98

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              6 
Socio-Economic Profile
The Scottish Index of Multiple Deprivation (SIMD) 2020 (the last available year), reports that 74 of
North Ayrshire’s 186 data-zone areas are ranked in the 20% most deprived, or 39.8% of data
zones in the area. An estimated 55,069 people live within these data zones which is around 41%
of North Ayrshire residents.
The last reported employment figures for North Ayrshire cover the period of October 2023 to
September 2024, which shows that 67.6% of the population is economically active which
represents a steady drop over the last few years and the lowest it has been in available records
which date back to 2004. This compares to 76.6% of Scotland’s population which has retained a
consistent rate. The unemployment rate in North Ayrshire is currently 4.1%, which although is
higher than the previous year, is still relatively low for the area and over time and compares to
3.3% in Scotland. This implies there is increasing economic inactivity in the area, which may be
indicative of the older population across North Ayrshire. During that time period, 15.7% of the
economically inactive population was retired compared to 14.4% in Scotland, and 41.6% were
long-term sick compared to 33.5% of Scotland.
The dependency ratio indicates the number of working aged people compared to dependents, or
those under 16 and over working age. Historically 16-64 has been used as the working aged
population despite recent changes to pension age and, although many people over 65 work, the
ratio is worked out based on the population alone which is a ratio recognised internationally to
allow for comparisons. Currently, the dependency ratio in North Ayrshire is 66.6. which means that
for every 100 working aged people, there are almost 67 dependents, compared to Scotland’s ratio
of 57.8. In 2011, the dependency ration in North Ayrshire was 57.6 and it is projected to increase
to 80 by 2033, whereas in Scotland the change is projected to change from 52 in 2011 to 60.6 in
2033 – which is still lower than the current North Ayrshire figure. More rural areas tend to have a
higher ratio than other areas, due to the smaller working age population which is an important
factor for planning and funding health and social care services that meet the needs of this
population.  
98

Page 99

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              7 
A snapshot of achievements during 2024-2025
Enable Communities
• North Ayrshire Alcohol and Drug Partnership - invited applications for grants of up to
£15k for projects that can reduce alcohol and drug-related harms in North Ayrshire. The
grants have a particular focus on: recovery-based activities in the evenings and at
weekends, developing opportunities for people to take part in activities that could help to
develop their skills, proposals that focus on engaging with young people about alcohol and
drugs, and challenging stigma in an innovative way and the provision of community-based
activities for children who may be impacted by substance use.
• Unpaid Carers Roadshow - North Ayrshire Carers Gateway and the NAHSCP Carers
Team held a series of roadshows to share information on benefits, fuel poverty, cost of
living, training and education, health and wellbeing, community organisations and support
groups.
• NAHSCP Locality Planning - the first cycle of the HSCP locality planning process has
now been completed, after an initial period of engagement with the public in April 2024.
The Locality Conversation events enabled us to hear from our communities on three key
areas of health and social care: Places and Spaces, Healthy Living and Services. The
themes that came out of these sessions will be used to identify issues within our localities
and feed into other planning processes, such as our next Strategic Plan. The Strategic
Planning and Equalities Team is also looking to do some targeted engagement with groups
with shared characteristics (for example, LGBTQ+, disability, carer, gender, age, religion,
ethnic minority) for both a revised Equalities Outcomes Plan and the NAHSCP locality
planning process.
• North Ayrshire Community Mental Health and Wellbeing Fund - For the 4th year
running, the North Ayrshire Third Sector Interface (comprising Arran CVS and The Ayrshire
Community Trust) delivered the Community Mental Health and Wellbeing Fund. The fund is
provided by Scottish Government to TSIs across Scotland, to support the development of
grassroots activity within communities. A variety of partners from NAHSCP services
supported this work, including being involved in the scoring of applications. In total,
£402,148 was distributed by the fund across 41 successful applicants.
• Trindlemoss Community Christmas 2024 - the festive season at Trindlemoss was filled
with joy and community spirit, thanks to the dedicated efforts of our Care at Home team. A
special Christmas lunch was organised in the Club Room at Trindlemoss Day 
• Care at Home Recruitment: Family Participation - our care at home team remains
dedicated to involving service users and their families in recruitment events. Family
members can drop into these events, meet the team, and discuss the care provided to their
loved ones. During these sessions, the team has received appreciation from families for
their compassionate care and efforts to address any concerns. This feedback highlights the
team's commitment to delivering high-quality, empathetic care as well as to ensuring that
families feel empowered to discuss their concerns openly and fully.  
99

Page 100

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              8 
Develop and Support our Workforce
• Mentoring Newly Qualified Social Workers Training - North and South Ayrshire Health
and Social Care Partnerships have teamed up with the Scottish Mentoring network to
deliver mentoring training to align with mentors supporting Newly Qualified Social Workers
during their supported year.
• Partnership Awards - the winners of the 2024 Partnership Awards were announced at our
‘Promoting Wellbeing Together’ event on 25th October 2024 at the Redburn Community
Centre in Irvine. The event was a fantastic celebration of the staff, teams and individuals
who deliver health and social care services in North Ayrshire, as well as the crucial work of
those in our communities who support people with their wellbeing, including volunteers,
community organisations and charities.
• New Managers Training - a 5-week course was recently offered to Care at Home
Managers, covering areas such as HR policies and procedures, budgets, trauma, child
protection, adult support and protection, complaint handling, leadership, supervision,
transitions, business administration, and evaluation. Attendees rated their knowledge
increase from 50% to 86%, and all those who attended noted they would recommend the
course to others. This training is crucial for developing and supporting our workforce.
• Lady Margaret Hospital - an executive leadership visit to Lady Margaret Hospital on the
Isle of Cumbrae took place on a sunny 15th May 2024. It is recognised that working on an
island comes with its challenges; however, the visit was extremely positive. Feedback from
the visiting team recognised the dedicated and collaborative island-based team who work
to ensure that the community is at the heart of everything they do. The Leadership team
commended the service for their commitment to continuous improvement by recognising
and tackling challenges head-on. Staff found the visit supportive and were pleased with the
recognition of the work they do on the island to support the whole community.
• Care at Home - our commitment to supporting our staff with the necessary skills and
resources is central to our service delivery. Recently, our ‘Frontline Event’ for Care at
Home Assistants focused on skill enhancement, employee development, networking, and
wellbeing. Staff participated in workshops, feedback sessions, and peer interactions.
Invited speakers covered essential topics such as tissue viability and stoma care. The
event was described as powerful, grateful, and inspiring by attendees.
• Arran Services: Recruitment - our Arran team has proactively addressed recruitment
challenges by working with a recruitment agency, resulting in a significant increase in
applications and new appointments. From January to August 2024, we focused on roles
such as Advanced Nurse Practitioner, Advanced Pharmacist Practitioner, Social Care
Worker, Care at Home Assistants, and more. The recruitment ads received approximately
8,500 clicks, 6,000 revisits, and 636,800 views.
• Arran Services: Activity Coordinator - the Arran team welcomed a new Activity
Coordinator at Montrose House, our nursing/residential care home. This role focuses on
developing person-centred activities for residents. The Care Inspection commended this
role for enhancing the quality of social stimulation and activities for residents.  
100

Page 101

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              9 
• Arran Services: Emergency Department Nurse Practitioners - the Partnership’s Executive
Team, along with NHSAA Chief Executive and Board members, visited Arran to receive an
update on progress. They toured the Emergency Department of Arran War Memorial
Hospital and met with new Emergency Department Nurse Practitioners. The team
discussed plans to develop the Single Point of Contact on Arran and demonstrated the
Netcall telephone system, which allows digital triage of patient requests. The IT
infrastructure work for Netcall is expected to be completed by the end of August. The team
also noted excellent national primary care survey results for Arran, indicating higher patient
satisfaction compared to other areas of Scotland.
Provide Early and Effective Support
• Relaunch of the North Ayrshire Perinatal Wellbeing Team - Following increased
demands upon the service, the former North Ayrshire Perinatal Mental Health Nursing team
within Universal Early Years, has rebranded to the Perinatal Wellbeing Team. The service
continues to provide mental health support to expectant and new mums with low level
mental health and wellbeing concerns and at any one time, can be supporting between 50
and 60 women. The expansion of the team means that all of North Ayrshire now has
support from the team. The team also works closely with the Ayrshire and Arran Perinatal
Mental Health service which supports mums with more severe mental health concerns
• Partnership with National Charity Dads Rock - The Universal Early Years service has
partnered with national charity Dads Rock through the Whole Family Wellbeing Fund to
bring a dedicated Dads Worker into the existing integrated early years’ service. This is the
first role of its kind in Scotland. Later in the year support for dads has received a boost after
it secured funding from the Scottish Government’s Whole Family Wellbeing Fund to expand
the service. The service works with dads from a wide range of backgrounds who have been
referred by their health visitor, family nurse, midwife or perinatal wellbeing team, providing
one-to-one support that impacts on the whole family and improves outcomes for children,
whether that be parenting advice, confidence building or support with general wellbeing.
• Transition Support group - A new North Ayrshire support group led by parents or carers
who support a child or young person aged 13 to 26 through a transition was held on 29th
May 2024 at the William Love Memorial Hall, Kilwinning. The group is supported by
NAHSCP, NHS Ayrshire and Arran and Unity Carers Gateway.
• Blue Badge Service Review - the Blue Badge project successfully established an efficient,
technology-driven delivery service model that complies with national standards and
enhances the end-user experience. By moving to a fully electronic online application
process, the team now processes applications within one working day, with no backlog or
waiting list. Payments are handled electronically, and a limited call-back service is available
for those unable to access online forms. The team's commitment and innovative approach
have led to timely Blue Badge issuance, reduced FOI and councillor enquiries, and
improved staff motivation. The refreshed approach aligns with strategic priorities, providing
earlier support for those with mobility issues. Performance monitoring ensures any issues
are promptly addressed.  
101

Page 102

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              10 
• Transformative Care Pilot (Multiple Sclerosis) - NHS Ayrshire & Arran, in partnership
with Coloplast Ltd, launched a successful pilot service to improve the lives of people with
multiple sclerosis (MS). This innovative service focuses on managing neurogenic bladder
and bowel dysfunction, a common issue for people living with MS. Key achievements
include the introduction of a dedicated bladder and bowel clinical nurse specialist, early
detection through patient questionnaires, and significant reductions in urine retention and
urinary tract infections. Patients have experienced improved health outcomes, enabling
them to engage more fully in work and social activities. This pilot sets a new standard for
MS care, demonstrating the benefits of early intervention and integrated care pathways.
• Drone Delivery of Lab Specimens - In a groundbreaking achievement, NHS laboratory
specimens were successfully delivered by drone across the Firth of Clyde. This innovation,
part of Project CAELUS, reduced delivery times from several hours to just 30 minutes,
significantly speeding up diagnostic processes and treatment decisions. This project
demonstrates our commitment to leveraging technology to enhance healthcare delivery,
particularly benefiting remote and rural communities. The successful trial marks a
significant step forward in addressing logistical challenges faced by remote communities.
• Ward 2 Palliative Care Pilot - Ward 2 launched an innovative pilot programme to receive
direct referrals from North Ayrshire GPs, in collaboration with District Nursing, for patients
requiring palliative and complex care. This initiative aims to reduce the need for acute
admissions, providing a more seamless and compassionate care pathway for patients. The
ward has successfully integrated community referrals and is working to strengthen links
with GP practices and District Nurses. Collaboration with Ayrshire Hospice is ongoing to
develop comprehensive education and training programmes for staff, focusing on key
aspects of palliative care, particularly pain management.
• Post Diagnostic Support (Dementia) - Recognised in Scotland’s National Dementia
Strategy, post-diagnostic support is crucial for people newly diagnosed with dementia.
High-quality support over an extended period helps individuals and their families live well
with dementia and prepare for the future. The Scottish Government guarantees a minimum
of one year’s support for every newly diagnosed person. Our designated CPNs provide
timely emotional and practical support, helping individuals understand their illness, manage
symptoms, stay connected to their community, and plan for future care. Since April 2024,
169 people have been offered post-diagnostic support, with 118 appointments arranged to
review medications and address stress and distress.
• Home from Hospital Support (Red Cross) - the Home from Hospital Support service,
provided by the Red Cross, has achieved significant milestones in offering essential
support to individuals during hospital stays and their transition back home. Key
achievements include regular check-in calls to ensure safety and well-being, assistance
with shopping and financial tasks, and providing companionship. This service has been
instrumental in reducing feelings of isolation and ensuring continuous support until no
longer needed. The dedication and kindness of the Red Cross staff and volunteers have
been widely appreciated, highlighting the positive impact of their efforts on the community.
• Anam Cara Respite Centre - the team at Anam Cara continue to offer outstanding care
and support to those in their care. Recently, a social and outgoing service-users, whose
primary priority was her family, was resident in the centre. The feedback from her family
102

Page 103

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              11 
underlines the difference this service can make to local people and their loved ones. The
family were delighted that their loved one had remained settled during the respite period,
enabling them to benefit from a break from their caring role (a role which can be
emotionally demanding), and giving them the peace of mind to confidently book another
period of respite. The family gifted the centre a piece of artwork noting their thanks.
Improving Mental and Physical Health and Wellbeing 
• Digital Community Alarms - North Ayrshire Health and Social Care Partnership has been
awarded the Bronze Digital Telecare Implementation Award in recognition of the progress
they have made on their analogue to digital telecare transition project. 17 Bronze status is
achieved when a Telecare Service provider has successfully deployed digital-ready alarm
devices to at least 50% of all dispersed and group alarm users. This is the first major
milestone in the transition to digital telecare and sets the foundations for the remainder of
the digital telecare transition.
• Learning Disability Health Check Plans - ongoing successful delivery of Annual Health
Checks for people with learning disabilities. The Scottish Government issued a new
specification for the delivery of Annual Health checks for adults with learning disabilities in
2022. The checks were initially rolled out in North HSCP in November, and in Late Spring
they were rolled out to East Ayrshire with a roll out to South Ayrshire in the summer of
2024. Up to 5th March 2025 Pan-Ayrshire a total of 1247 (61%) health checks have been
offered to the identified population and 826 (41%) health checks have been completed. In
North Ayrshire to date, 85% (572) of the identified population have bene offered a health
check and 68% (444) health checks have been completed. NHS Ayrshire's progress in
relation to delivery of the new checks represents a significant proportion of the progress
made so far nationally. This represents an immense amount of work on the part of the
Nurses and senior staff who have led the work, and highlights Ayrshire's long-
standing good practice with regard to the delivery of a pre-existing enhanced service for
people with learning disabilities in Primary Care.
• Mental Health Unscheduled Care Assessment Hub – Official Opening the Mental Health
Unscheduled Care Assessment Hub was officially launched on Friday 13th September
2024 with full operational opening from 5pm that day. The Mental Health Unscheduled
Care Assessment Hub, based at Woodland View in Irvine, provides a patient-focused,
therapeutic space to support the delivery of compassionate care to those individuals with
acute mental illness who would be eligible to access an adult acute mental health bed for
ongoing intensive assessment.
• NDD Support NAHSCP- ran a series of events that provided an opportunity for parents
and carers of a child or young person with a diagnosed or suspected neurodevelopmental
difference (NDD). These sessions offered a chance to hear more about the work being
undertaken across North Ayrshire and provide further feedback.
• Dementia Support - the Dementia Support service has made significant strides in
providing essential social stimulation and support to individuals experiencing cognitive
impairment. Through patient and reassuring communication, the team take time to explain
the benefits of the service and ensure service-users feel in control of their care. They
develop bespoke support plans and focus on engaging service-users in meaningful
103

Page 104

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              12 
conversations about their emotions and memories. This approach helps build trust and
leads to active and joyful participation in support services. The success of this initiative
highlights the importance of personalized care and the positive impact of early and effective
support on mental and emotional well-being.
• Improved Care Inspectorate Grades at Montrose House Care Home - the latest
inspection report for Montrose House Care Home, conducted on 29th October 2024,
highlights a number of positive developments and improvements. The service has made
substantial progress since the previous inspection, positively impacting residents'
experiences and outcomes. The service received a "Good" rating for both supporting
residents' wellbeing and leadership. Effective methods for staffing assessment and
planning have been implemented, ensuring safe and sufficient staffing levels. The
introduction of robust quality assurance processes has led to continuous service
improvement, with key tasks delegated to capable staff members. The employment of an
activity coordinator has significantly enriched residents' daily lives, and the home has
improved its cleanliness and infection prevention measures.
• Holly Health App - the Holly Health app, available to all GP Practice patients and HSCP
staff across North Ayrshire for 12 months, has shown promising results in improving health
outcomes. Over an 8-week study period, users with low-to-medium baseline scores
reported a reduction in GP appointments, with frequent attendees seeing a significant
decrease.
Tackle Inequalities
• School Welfare Rights Officers - welfare rights advice in schools is expanding Money
Matters has had a dedicated Welfare Rights Officer providing advice in North Ayrshire
secondary schools since 2021. The service has been a huge success and has put more
than £1m into the bank accounts of families during this time. The project is now expanding,
with an additional two Welfare Rights Officers joining the team. This will enable the team to
offer advice to all parents / carers with children in any education establishment, including
early years, primary and secondary.
• Collaborating to Reduce Health Inequalities (CHES) North Ayrshire is embarking on a
new and innovative collaboration to improve health equity in partnership with Public Health
Scotland and the Institute for Health Equity, led by Professor Sir Michael Marmot, at
University College London. North Ayrshire has some of the lowest healthy life expectancies
across Scotland, with significant health inequalities across our communities. North Ayrshire
Council are partnering with the Integration Joint Board to be one of the 3 local authority
areas in Scotland to take this work forward. The Collaboration for Heath Equity in Scotland
(CHES) programme focuses on using the eight ‘Marmot principles’ to deliver better health
outcomes through improving the conditions in which people are born, grow, live, work and
age. The North Ayrshire CHES programme will officially launch on 25th February and the
IJB will be included and kept informed of progress.
• Dementia Connect Event - earlier this year, North Ayrshire's first ever Dementia Connect
event brought together those living with dementia and their carers to learn more about
dementia care and the supports available. Around 80 people attended the free event to
hear guest speakers including Professor Elaine Hunter, National AHP Consultant for
104

Page 105

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              13 
Alzheimer's Scotland, and Susan Holland, NHS Ayrshire and Arran's Nurse Consultant for
Dementia. The event featured conversations based on the outcomes of the national
strategy, activities highlighting the challenges faced by individuals living with dementia, and
a marketplace with representatives from local and national support services. The event was
a great success. 
• Money Matters - the Money Matters team is engaged in a two-year initiative to implement
Welfare Rights services within eleven GP practices throughout North Ayrshire. Since the
project's inception, three Income Advisers have secured nearly £4 million in benefits for
local patients and residents. A notable achievement involved assisting an individual with
unrecognized learning challenges who faced escalating mental health issues due to the
demands of Universal Credit. The team provided comprehensive support, including
overturning a Universal Credit penalty, filing for Adult Disability Payment, navigating the
'unfit for work' designation process, and facilitating a successful bus pass application. As a
result, the individual now benefits from an extra £158 weekly and has received back
payments exceeding £6,000. This initiative highlights the team's dedication to tackling
inequalities and improving the financial well-being of the community. 
105

Page 106

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              14 
Organisational Performance 
Our 2022-2030 strategic plan set of performance measures reflect the transformation of services
to meet continual service improvement and demand. Where an indicator presents as being off
track, commentary with proposed resolution and future mitigation is provided on how to improve
future performance.
Performance reporting comprises of a series of key performance indicators and key actions, which
link directly to our strategic plan. Performance is reported at a number of levels within the
organisation including the Integration Joint Board Performance and Audit Committee, the
Integration Joint Board (IJB), the Joint Review with North Ayrshire Council and NHS Ayrshire and
Arran Chief Executives, and service performance reviews within each service area.
For 2024-2025 the set of performance measures were agreed and presented to the Performance
and Audit Committee highlighting service defined changes. These included:
• Target resetting
• Removal of measures that are no longer reflective of the service improvement
• The inclusion of new measures to meet service improvement and current operational demand
For the year ending 31st March 2025, the Partnership ended the period reporting 26 performance
measures across all service areas. At the time of writing, 25 out of 26 measures have been
collated comprising 96% of all measures reported to the end of 2024-2025. Due to the time for
collation and verification of the outstanding Quarter 4 measure update, we have included the RAG
status as ‘On Target’ based on the annual performance to date which has been Green for all
quarters. The latest Performance and Audit Committee Report shows progress against the key
measures, and this is represented in the chart below. 
106

Page 107

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              15 
As part of our commitment to continuous improvement, we recognise areas where we could do
more and by monitoring indicators which present as significantly adrift enables us to identify and
target plans to address performance issues. The key areas off target for 2024-2025 were:
• Support more children and young people into kinship care placements each year
• Increasing foster carer support.
• Reducing the number of people on the waiting list for a Care at Home service in the
Community and Hospital. 
• Reducing the number of people waiting for assessment.
• Absence levels remain an area of review.
The continual review of Foster Carer availability within our Children and Families Service has
revealed that our foster carers are becoming older and unfortunately have succumbed to health
issues, and as such we have lost a high number of foster carers. We have seen more interest
within our Short Break Schemes, which operate over evenings and weekends, as this enables
people to continue to work and also allows them to take on the fostering role ‘part time’. Our
Fostering and Adoption Teams continue to actively recruit and given that most people today make
use of social media, we have investigated options in relation to this and have chosen the
organisation ‘Can Digital’ to assist us raise our digital profile. Through this medium we have noted
a rise in enquiries, which hopefully will translate into applications and ultimately new foster carers,
Throughout the year our Health and Community Care services continue to experience ongoing
and sustained challenges in delivering frontline Care at Home Services although Quarter 4 saw
the greatest improvement in performance during 2024-2025. There remain ongoing workforce
challenges related to sickness absence rates and vacancies. 
As part of the financial recovery plan submitted to IJB in September 2024 there was a requirement
for a reduction in last year’s spend with further savings required for 2025-2026. As a result, a
recruitment freeze was implemented and continues, with a review of existing vacancies ongoing.
This has resulted in an increase in vacancies and overall reduction in service capacity. 
Wellbeing action plans around sickness absence levels within the Care at Home workforce to
ensure the impact of high absence levels is being robustly managed and supporting staff to
maintain attendance/return to work. 
A reablement focussed review of low-level care packages is underway to ensure signposting and
use of technology and community resources where applicable. An additional review of double
handling cases is being completed in conjunction with our Moving and Handling team colleagues.
It is anticipated these reviews may create additional capacity for new referrals to meet the ever-
increasing demand for services from our acute sites and communities. 
These works are being undertaken under the umbrella of a further increase in community referrals
for Care at Home support together with a rise in both hospital and emergency service requests.  
107

Page 108

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              16 
Annual Accounts 
The Annual Accounts set out the financial statements of the IJB for the period ended 31 March
2025. The main purpose is to demonstrate the stewardship of the public funds that have been
entrusted to the IJB for the delivery of its vision and strategic priorities as outlined in the Strategic
Plan. The requirements governing the format and content of the Annual Accounts are contained in
The Code of Practice on Local Authority Accounting in the United Kingdom (the Code). The
Annual Accounts for 2024-2025 have been prepared in accordance with this Code.
The Financial Plan
Strong financial planning and management is paramount to ensure our limited resources are
targeted to maximise the contribution to our objectives. Delivery of services in the same way is not
financially sustainable. The updated strategic plan approved for 2022-2030 is underpinned by the
need to learn from the pandemic and ensure opportunities are maximised to transform care
models and find new solutions to ensure the future sustainability of high-quality heath and care
services. 
The ability to plan based on the totality of resources across the health and care system to meet
the needs of local people is one of the hallmarks of integrated care. Medium term financial
planning is key to supporting this process and identifying the transformation and planned shift in
resources to provide sustainable services to the local community over the medium term. 
Financial Performance
The IJB set a balanced budget for 2024-2025 on 14th March 2024. This did not require any draw on
reserves but did include the approval of £10.290m of savings to achieve financial balance.
Financial information is part of the performance management framework with regular reporting of
financial performance to the IJB. This included an integrated approach to financial monitoring,
reporting on progress with savings delivery, financial risks and any variations and changes to the
delegated budget. There were significant financial challenges during the period. The main
challenges during the year were residential placements for children, care at home, supplementary
staff in wards and Unplanned Activities (UnPACs) within the lead partnership for mental health.
From the initial budget monitoring report in month 3 the projected position has been an
overspend. The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with the available
resource. 
Following the finalisation of the 2023-2024 outturn position, the IJB agreed some initial recovery
actions at the meeting in June and a more detailed financial recovery plan was developed and
approved by the August 2024 IJB.  
108

Page 109

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              17 
Other management actions which have been implemented include:
• Review of expenditure authorisation levels across the Partnership and escalation of
specific decisions to senior officers. In particular, a new governance group has been
introduced, involving the Director and Heads of Service, to oversee the agreement of
higher value packages of care (above £40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval. The vacancy
scrutiny group now has representation from all of the Heads of Service and a recruitment
freeze will be implemented for all but essential frontline posts.
• Ongoing review of future year savings or transformation programmes to identify scope for
acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund (ILF)
Scotland.
In order to facilitate greater scrutiny of the financial position and the delivery of the financial
recovery plan during 2024-2025, the IJB agreed at the June meeting to establish a ‘Finance
Working Group’, chaired by the IJB Vice Chair. The Director and Heads of Service are members
of the group. This FWG meets monthly to facilitate increased oversight and scrutiny of the
financial position and transformation programme as well as detailed budget planning for future
financial years. To date the Finance Working Group has covered:
• Care at home
• Care homes
• Charging income
• Financial inclusion
• An overview of the 2024-2025 budget
• Brighter Pathways project
• Addictions Prescribing
• Medium-Term Financial Outlook
• 2025-2026 Budget Outlook
• Delayed discharge performance and improvement actions
• Community OT – Aids and Adaptations
Since the initial recovery plan was agreed in June 2024 there was a £4.002m reduction in costs.
The outturn is an overall year-end overspend of £1.212m on an IJB basis, which when adjusted
for new earmarked reserves of £2.381m is increased to £3.593m (1.1%), which is a favourable
movement of £1.387m from month 10. 
The Integration Scheme describes the required approach where there is a projected overspend on
the IJB integrated budget, which includes the requirement to agree a recovery plan to balance the
overspending budget. Only if the recovery plan is unsuccessful will the Health Board and Council
consider making available interim funds. The Chief Officer wrote formally to North Ayrshire
Council and NHS Ayrshire and Arran to request additional in-year funding and at month 12 the
following has been agreed:
109

Page 110

North Ayrshire Integration Joint Board Audited Annual Accounts to 31st March 2025                                              18 
Social Care element – overspend of £2.036m. North Ayrshire Council considered this at the
Council meeting of 3rd June and agreed to fund this with no requirement to repay the funds in
future years.
Health element – overspend of £1.557m. NHS Ayrshire and Arran have funded this, previous
discussions with NHS AA colleagues in relation to repayment indicated the Health Board would
wait to consider this following North Ayrshire Council’s consideration. The outcome of the decision
by North Ayrshire Council has been communicated to NHA AA Director of Finance for
consideration.
Following these additional funding contributions the final position is on-line.
The table below reconciles the deficit on the provision of services of £2.349m as noted in the
Comprehensive Income and Expenditure Statement to the financial outturn position of on-line.
Reconciliation Table 2023-2024 2024-2025
(Surplus) / Deficit on provision of services 11.218 2.349
Earmarked reserves released to services during the
year (8.736) (4,730)
Sub Total  2.482 (2.381)
NEW Earmarked Reserve Balances 2.982 2.381
Financial Outturn (underspend) 5.464 0
The table below summarises the financial performance for 2024-20256 and 2023-2024. This
notes the budget outturn on a managed basis (including the full allocation for North HSCP lead
partnership services) and adjusts this for the net impact of lead partnership allocations across
North, South and East Ayrshire and also for new earmarked balances. 
The table includes the financial performance for services managed by the IJB during the period,
therefore it excludes the large hospital Set Aside Budget of £39.966m which was allocated at the
end of the period to the IJB. The set aside budget is included within the financial statements. 
2023-
2024
Budget
£000
2023-
2024
Actual
£000
Variance
(Fav) /
Adv
£000
Service 2024-
2025
Budget
£000
2024-
2025
Actual
£000
Variance
(Fav) /
Adv
£000
91,174 95,625 4,451 Health and Community
Care 92,549 98,181 5,632
100,990 98,639 (2,351) Mental Health 108,721 107,823 (898)
40,135 43,431 3,296 Children, Families and
Justice 43,717 44,294 577
52,865 52,863 (2) Primary Care 53,575 53,662 87
10,098 10,098 0 Allied Health
Professionals 10,748 10,749 1
110

Page 111

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        19
2023-
2024
Budget
£000
2023-
2024
Actual
£000
Variance
(Fav) /
Adv
£000
Service 2024-
2025
Budget
£000
2024-
2025
Actual
£000
Variance
(Fav) /
Adv
£000
12,740 11,287 (1,453) Management and Support
Costs 13,970 10,186 (3,784)
1,852 1,317 (535) Chief Social Work Officer 1,635 1,725 90
1,671 1,630 (41) Financial Inclusion 1,710 1,773 63
3 3 0 National Commissioned
Service 4 4 0
311,528 314,893 3,365 Total expenditure 326,629 328,397 1,768
(311,528) (311,528) 0 Total income (326,629) (326,629) 0
0 3,365 3,365 Outturn on a managed
basis 0 1,768 1,768
0 1,117 1,117 Lead Partnership
Allocations 0 (556) (556)
0 4,482 4,482 Outturn on an IJB basis 0 1,212 1,212
0 2,982 2,982 New Earmarking 0 2,381 2,381
0 (2,000) (2,000) Draw on Reserves 0 0 0
0 5,464 5,464
Outturn position prior to
additional funding
contributions
0 3,593 3,593
0 0 0 Additional funding
contributions 3,593 0 (3,593)
0 5,464 5,464 Final outturn position 3,593 3,593 0
The main areas of variance during 2024-2025 are noted below:
Health and Community Care – overspend of £5.632m mainly relates to overspends in care at
home, agency costs within integrated Island Services, supplementary staffing in wards and district
nursing staffing costs and care packages for people with a physical disability.
Mental Health – underspend of £0.898m which relates to underspends in learning disability care
packages, community mental health, non-employee costs at Trindlemoss and these are offset by
the overspend on the Lead Partnership for mental health (UnPACs, elderly inpatients, psychiatry
and mental health pharmacy). There were also underspends in the Lead Partnership to the level
of vacant posts and these were taken as payroll turnover. There is also an underspend in the
Alcohol and Drugs Partnership which will be earmarked for use in 2025-2026. 
Children, Families and Justice – overspend of £0.577m which is mainly related to overspends
in services for care experienced children (residential care, respite care and employee costs) and
services for children with a disability (residential care, respite care). These were partially offset by
an underspend in payments for looked after and accommodated children (fostering, adoption and
kinship) and the Whole Family Wellbeing Fund which will earmarked for use in 2025-2026.     
111

Page 112

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        20
Management and Support Costs – underspend of £3.721m mainly relates to underspends in
transition funding, an over-recovery of payroll turnover due to the level of vacant posts being
higher than assumed when setting the budget and the draw down of funding from reserves. 
Movement in Projected Outturn Position:
The overall movement in the projected outturn during the period is illustrated below: 
Lead Partnership Services 
The final outturn is adjusted to reflect the impact of Lead Partnership services. In the absence of
detailed service activity information and alternative risk sharing arrangements, it was agreed that
the outturn for all Lead Partnership services would be shared across the 3 partnerships on an
NRAC (NHS Resource Allocation Committee) basis.  
The outturn of the lead partnership services for each IJB is provided below, the adjustment to the
North IJB outturn reflects the impact of reallocating a share of the North lead partnership services
underspend to the other two areas and receiving an NRAC share of the outturn for the South and
East partnerships. In addition, any allocations of ring-fenced funding are returned to each IJB in
line with allocations and expenditure to allow each IJB to carry forward for future use.
IJB £000 Over/Under Explanation of Outturn 
North 658 Overspend Mental health services, mainly due to overspends on UnPACs,
elderly inpatients, psychiatry and mental health pharmacy offset
by vacancy savings. 
South  598 Overspend Pressures from the community equipment store and continence
service offset by underspends in the Family Nurse Partnership
East (2,119) Underspend Underspends in the Primary Care Improvement Fund, Dental
Services and AHP services.  
112

Page 113

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        21
Set Aside Budget 
The Integration Scheme establishes that pressures in respect of large hospital set aside budgets
will be managed in-year by NHS Ayrshire and Arran. Work has been undertaken with
partnerships to progress and develop set aside arrangements to fully implement the legislative
requirement. This includes arrangements in relation to the use of Directions, Joint
Commissioning Plans and overall progression towards fair share allocations of resources. 
Further work has been undertaken through the Ayrshire Finance Leads group to establish
baseline resources for each partnership and how this compares to the NRAC “fair share” of
resources. Ayrshire Finance Leads have now agreed a baseline methodology for set aside
budgets which involves using the average of the four full years prior to the pandemic, 2016-2017
to 2019-2020 inclusive.
The 2024-2025 actual usage information is not known until after the IJB date, so the info used is
the baseline at 2024-2025 prices.
IJB
Set Aside
2024-2025
£m
Baseline Bed
Days
%
Baseline Budget
Share 2024-2025
£m
Over / (Under)
Baseline Share
£m
East Ayrshire 31.87 28.90% 28.183 3.687
North Ayrshire 39.966 38.60% 37.807 2.159
South Ayrshire 34.488 32.50% 31.247 3.241
Total 106.324 100.00% 97.237 9.087 
Climate Change
The Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland) Order 2015
came into force in November 2015, as secondary legislation made under the Climate Change
(Scotland) Act 2009. The Order requires bodies to prepare reports on compliance with climate
change duties. This includes Integration Joint Boards established by order under section 9(2) of
the Public Bodies (Joint Working) (Scotland) Act 2014.
Scottish Government guidance was issued to IJBs in May 2017, setting out detail of the new duty to
produce an annual climate change report. The report requires to be approved by the IJB, with
returns to be submitted on the Sustainable Scotland Network (SSN) online portal by 30 November
each year. The report was submitted on 12th November 2024, but the IJB haven’t been asked to
approve as the IJB don’t have staff, fleet vehicles or property so the return refers to the North
Ayrshire Council and NHS Ayrshire & Arran climate change reports. 
Both North Ayrshire Council and NHS Ayrshire & Arran submit separate reports to the SSN and
these are published online. As the parent bodies of the IJB, both North Ayrshire Council and NHS
Ayrshire & Arran retain responsibility for employees who are managed within the Health and
Social Care Partnership. The employees, therefore, contribute to support the implementation of both
bodies’ Climate Change Plans. North Ayrshire IJB has no direct responsibility for employees,
buildings or vehicles, which are contained within the parent bodies’ reports, however full
consideration of climate change implications will form part of future IJB service redesign, as part of
the transformational change programme. 
113

Page 114

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        22
Overall position
It is essential that the IJB operates within the delegated budget and commissions services from
the Council and Health Board on that basis. The 2024-2025 outturn has depleted the general
reserves and additional funding was made available from North Ayrshire Council and NHS
Ayrshire & Arran. Some areas of current overspend have been invested in as part of the 2025 to
2026 approved budget but many of the underlying overspend areas will continue into 2025 to
2026. Services require to address these or there will continue to be a reliance on other budgets
underspending and a risk of having to seek additional funding from North Ayrshire Council and
NHS Ayrshire and Arran.
The current Transformation Plan 2024 to 2027 will be refreshed, and the Partnership is currently
undergoing a programme of research to understand the current and future needs of residents and
service users, including a Strategic Needs Assessment, Review of national and Local Policy,
analysis of local engagement, and mapping of existing service to inform this. 
114

Page 115

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        23
Financial outlook, risks and plans for the future 2025-2026 and beyond
The Scottish Government published an updated Medium-Term Financial Strategy (MTFS) in May
2023 which covers the period to 2027 to 2028. It compares the funding and spending scenarios
to assess the scale of the challenge. The role of the MTFS is to set out Scotland's fiscal outlook
over the coming years, including financial opportunities and risks that may impact on the fiscal
position. In line with the recommendations of the Budget Process Review Group, the document
does not set out new spending plans or explain how prioritisation decisions will be made to meet
policy objectives. These decisions are made in the Scottish Government budget.
The Scottish Government’s funding is comprised of five high level categories:
1. The Block Grant – this is the single largest source of funding for the Scottish Government.
The Barnett Formula determines the Block Grant and annual growth is dependent on the
UK Government’s overall fiscal plans and its spending priorities.
2. Devolved taxes – the Scottish Government receives the revenue from these taxes, the
largest of which is Scottish Income Tax. The Scottish Budget is then reduced based on
how quickly revenues of the corresponding tax have grown in the rest of the UK (rUK) on
a per head basis.
3. Non-domestic rates (NDR) – this revenue is raised by Local Authorities on non-domestic
properties. All revenue raised is ultimately returned to Local Government via the Local
Government Settlement.
4. Social Security Block Grant Adjustments – this is funding provided by the UK Government
for devolved social security payments, based on the growth in expenditure on the
corresponding payment in UK on a per head basis.
5. Other income and expenses – other revenue and costs including resource borrowing and
associated costs as well as revenues from the Scottish Crown Estate
The Scottish Government MTFS models three scenarios (a central resource funding outlook and
an upside and downside scenario, indicating plausible alternative funding paths) and outlines the
immediate and longer-term pressures on public spending which need to be considered when
developing spending plans to ensure that they meet the needs of a changing population and
build resilience for the future.
The Scottish Government intended to publish an updated Medium-Term Financial Strategy
during 2024, alongside a refreshed Medium-Term Financial Framework for Health and Social
Care. These documents were scheduled for publication in June 2024 but were delayed due to the
General Election in July 2024. These will form the basis of the funding assumptions in the next
update of our Medium-Term Financial Outlook which will cover the period 2025-2028.
Since the unaudited accounts were submitted in June 2025 the Scottish Government have
published their seventh Medium-Term Financial Strategy. It provides the economic and fiscal
context for the Scottish Budget and sets the medium-term strategy for sustainable public
finances.
The three pillars of the 2025 Medium-Term Financial Strategy are:
Pillar 1: Ensuring public money is focused on delivering government objectives, underpinned by
reform and prioritisation to maximise impact.
Pillar 2: Supporting sustainable, inclusive, economic policies with the greatest potential to grow
Scotland's economy, expand and broaden the tax base to fund public services.
115

Page 116

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        24
Pillar 3: Ensuring a strategic approach to tax revenues, which considers the longer-term impact of
our tax choices and competitiveness.
This Strategy will be considered in the next update of the Medium-Term Financial Outlook in
2025-26. 
Medium Term Financial Outlook
A Medium-Term Financial Outlook (MTFO) is a critical part of the strategic planning process. The
financial context for public services remains very challenging and so it is vital that the IJB’s
strategic ambitions are set against the financial resources which are anticipated to be available.
The MTFO provides key information on the possible financial position of the IJB over future years.
It identifies the financial challenges which will be faced by the IJB enabling the IJB to see the
impact of current and future decisions on its medium-term financial health.
The MTFO will also be used to identify pressure points and inform decisions which are required to
ensure the Partnership remains financially sustainable.
There are a range of factors which influence the financial planning of the IJB. These are
considered through the MTFO and include the following:
• Demographic changes.
• Local priorities.
• Workforce challenges.
• The UK and Scottish Economy.
• Policy and Legislation.
• Cost and demand pressures.
• Available funding.
As in previous years, a Medium-Term Financial Outlook has been prepared to identify what the
financial position may look like moving into 2025-2028. This was presented to the December 2024
IJB.
2025-2026 Budget
As part of the Scottish Government budget and finance settlement funding letters were issued to
NHS Boards and Councils, these detailed the requirements in relation to the level of funding to be
delegated to IJBs in 2025-2026.
The specific requirements and funding provision is as follows:
NHS Ayrshire and Arran
• NHS Ayrshire and Arran are required to passport the 3% through to IJBs (£4.040m to North
Ayrshire) – “In 2025-2026, NHS payments to Integration Authorities (IA) for delegated
health functions must pass on an uplift of 3% over 2024-2025 agreed recurring budgets.” 
• Additionally, there is funding of £150m nationally for Agenda for Change Pay Reform. A
share of this funding will be allocated to the IJB to meet the associated costs for NHS staff.
This is being followed to ensure the correct roll-forward into 2025-2026 and it is anticipated
at this stage that the costs of the pay reform will be fully funded. 
• Moving into 2025-2026, brokerage will no longer be available to NHS Boards and all
Boards must work towards break-even. Should financial balance not be achieved this
116

Page 117

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        25
would be shown as an overspend in financial statements, leading to potential qualification
of accounts and Section 22 report, as well as consideration of escalation status.
• The NHS budget includes a commitment of additional funding to reduce waiting lists and to
help support reduction of delayed discharge; as well as a commitment to renew primary
care enhancements, including new core funding to GMS to deliver enhanced frailty,
cardiovascular disease and other essential services in General Practice, a critical dental
workforce and training package and a community eye care programme to transfer patients
from waiting lists. Further details of the allocation of funding is to follow but a submission
from NHS AA incorporates the request for funding from North Ayrshire IJB and this was
submitted to the Scottish Government early March 2025.
• Similarly to Local Government NHS Boards have also been advised to plan on the
assumption of 60% funding for the Employers National Insurance Increase.
North Ayrshire Council 
• Based on the 2025-2026 Finance Settlement the Health and Social Care Portfolio will
transfer additional funding of £140 million to Local Government to support social care and
integration for 2025-2026.
• The funding allocated to Integration Authorities should be additional and not substitutional
to each Council’s 2024-2025 recurring budgets for services delegated to IAs and therefore,
Local Authority social care budgets for allocation to IAs must be at least £140 million
greater than 2024-2025 recurring budgets.
• The increase in Employers National Insurance from April 2025 has not been fully funded for
the public sector in Scotland and has created a significant financial pressure. For Local
Government funding of around 60% of the cost will be provided by Scottish Government for
directly employed staff. There is zero funding being provided for any commissioned
services.
• Specific funding for the IJB was received for the following areas:
• Real Living Wage   
• Free Personal and Nursing Care
• Additionally, North Ayrshire Council have passed through a share of the Local Government
Grant uplift of £2.114m and have fully funded the increase in Employers’ NI costs of
£1.898m for NAC contracted staff. This has resulted in a net increased contribution to the
Partnership of £13.280m through the NAC budget setting process. Some elements of this
relate to previous years and were already assumed in the Partnership base budget and this
is shown in the tables below. 
Area £m
Adult Social Care RLW 3.388
Children’s SW Services RLW 0.490
FPNC 0.213
117

Page 118

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        26
Area £m
MH Recovery & Renewal (MHO funding
element) (0.091)
2023-2024 Pay Award Adjustment (0.178)
Employers NI Increase 1.898
Additional Funds – share of grant uplift 2.114
Per the HSCP budget plans 7.834
Reconciling Items to the Council Budget Paper
Amounts already included in HSCP base budget:
Area £m
Adult Social Care RLW 2024-2025 6.477
Scottish Disability Assistance 2024-2025 0.134
Children’s SW Services RLW 2024-2025 0.569
Additional 2024-2025 Pay Award 1.057
Justice Services Grant - not yet in settlement (2.657)
Scottish Disability Assistance – not yet in
settlement (0.134)
Per Council Budget paper 13.280
Moving into 2025-2026 the Partnership is proactively working to provide safe and effective
services for the residents of North Ayrshire within the financial envelope, this is supported by
approving a balanced budget and a focus on the delivery and alignment of financial plans through
the transformation plan. 
The IJB approved a one-year balanced budget for 2025-2026 on 20 March 2025. More
information about the 2025-2026 Budget
This budget included new budget pressures for health and social care services totalling
£14.943m. These were developed in partnership, with Finance supporting front line services to
identify current and emerging financial pressures considering historic demand and costs and
potential future variations. The provision of funding for pressures has the impact of increasing the
budget gap to be addressed through savings, therefore the pressures are only included in budget
plans where these are absolutely unavoidable.
The new cost and demand pressures resulted in a requirement to identify and approve additional
savings of £4.019m, as noted in the summary below, this includes an over-delivery of in-year
118

Page 119

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        27
savings to address recurring areas of overspend from 2024-2025 and to seek to accelerate
savings plans to support future year’s budget gaps:
Description
Social Care
(NAC)
£m
Health
(NHS A&A)
£m
Total
£m
Funding Increase (7.834) (4.040) (11.874)
Resource Transfer (0.670) 0.670 0
Service Pressures 10.680 4.263 14.943
In-year Budget Gap 2.176 0.893 3.069
Approved Savings (2.903) (1.116) (4.019)
The Integration Joint Board, in common with most Public Sector bodies, is facing a period of
significant financial challenge with cost and demand pressures. The most significant financial
pressures continue to be pay awards for staff, inflationary cost increases for contracted services
and demographic changes driving increased demand for services - funding these unavoidable
pressures year-on-year drives our savings requirement.
2025-2026 Opening Position
Part of the 2024-2025 overspend will impact on the 2025-2026 opening position. The adjusted
opening projection for 2025-2026 is a £1.539m overspend.
This reflects the full year impact of part year cost reductions achieved in 2024-2025, including -
care at home, Brighter Pathways, care packages, vacancy management and supplementary
staffing – targeted improvement in other areas. It assumes all mitigations and controls established
in 2024-2025 continue throughout 2025-2026 as it is recognised that the same uncertainty and
risks remain into 2025-2026 and there needs to be tight grip and control over expenditure overall.
The improvement from the 2024-2025 position to the opening projected overspend for 2025-2026
is predicated on maintaining Financial Recovery Plan Controls, and:
• Removing the care home overspend and manging the number of placements in line with
the budgeted level
• Reduce agency costs at Montrose House on Arran
• Significant reduction or removal of overspends on supplementary staffing across wards
through focussed improvement work supported by the General Manager, Lead Nurse and
responsible Senior Managers
• Adult Community Care Packages (Learning Disabilities and Mental Health) breakeven
across client groups – net reduction
• Eating Disorders and Psychiatry managing within budget
• Maintaining payroll turnover over-recovery and therefore same vacancy management
controls
There are a number of ongoing financial risk areas that may impact on the 2025-2026 budget
during the year, these include:
• Current overspend areas, especially in low volume / high-cost services e.g. Children’s
residential placements, UNPACs, and supplementary staffing across community, mental
health and learning disability wards.
• Growing demand for services.
119

Page 120

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        28
• Staff recruitment and retention challenges across a number of service areas.
• The impact of the increase in Employers National Insurance Contributions, the impact of
funding of this increase and also the compounding impact on social care commissioned
care providers.
• The expectation that performance will continue to be maintained or improved despite the
significant resource challenges.
• Ongoing delivery costs of Scottish Government policy directives, particularly where these
are not fully funded or inflation proofed.
• The Local Government and NHS pay awards are not settled for 2025-2026; as outlined in
the report, a 3% increase has been assumed for the social care workforce and for NHS it
is anticipated that additional funding will be allocated once the pay award has been settled.
If the pay awards are not fully funded, then this will present an in-year cost pressure.
• Unearmarked reserves are depleted, there is no scope to absorb in-year variances, with
any overspends requiring additional funding from partners.
• The ongoing review of the Integration Schemes, where there is a focus on financial
arrangements and risk share.
• The wider system financial challenges and impact across the whole system, for example
the financial position of NHS AA and the decisions taken to reduce the Board’s deficit may
have impacts on other parts of the health and care system.
• The ability to re-pay funding partners in-year for previous year overspends given continued
financial challenges.
• Removal of brokerage for NHS Boards.
• The overall sustainability of commissioned care providers, with eNICs compounding
historic challenges re financial sustainability, there is a heightened risk of provider failure
leading to handing back of care and contracts.
The National Position
Overall, the financial outlook for Health and Social Care Partnership is challenging with significant
budget gaps across the country to maintain the current service provision (national budget gap of
£497.5m for 2025-2026). Budget gaps for IJBs across Scotland range from 1.3% to 12.6% with
significant level of variation. Many IJBs also have depleted reserves (national total at April 2025
£55m) and of those with reserves only one meets the best practice contingency reserve level of 2-
4% of revenue budget.
Whilst there are variations in the scale of the gap, the areas contributing to the pressures across
the system are similar and include: 
• Increases in demand, complexity and demographics
• Prescribing
• Recurring deficits/ baseline pressures/ inflation
• Pay pressures
• Contract inflation for commissioned services 
These critical financial pressures facing IJBs have been shared by Health and Social Care
Scotland with Scottish Government to seek additional financial support for community based
health and social care services. 
Set Aside 
The Partnership has a responsibility, with our local hospital services at University Hospital
Crosshouse and University Hospital Ayr, for planning services that are mostly used in an
unscheduled way. The aim is to ensure that we work across the health and care system to
120

Page 121

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        29
deliver the best, most effective care and support. Service areas most commonly associated with
unplanned use are included in the Set Aside budget. Set Aside budgets relate to the strategic
planning role of the Partnership. Key areas within this budget are:
• Accident and emergency.
• Inpatient services for general medicine.
• Geriatric medicine.
• Rehabilitation.
• Respiratory.
• Learning disability, psychiatry and palliative care services provided in hospital.
The annual budget for Acute Services is £462.6million. The directorate overspent by £36.9 million
in the 12 months to 31 March 2025. This was caused by overspends on agency medical and
nursing staff, together with medicines expenditure, equipment and supplies. 
November saw a successful reduction in unfunded beds. Operational challenges in December
carried on into the final quarter. Ayr had 24 additional beds open between Station 8 and Station
12 every day and an average of 13 on Station 11. Crosshouse continued with 78 unfunded beds
open in March, and in addition 24 full capacity beds were open each day on average. The SAFER
programme in Crosshouse is progressing well and early indications show a reduction in Length of
Stay (LoS) across two wards by 2.5 days each. The co-horting of patients in the active wards is
also demonstrating a reduction in LoS in other areas.
There is a material underlying deficit caused by:
• Unachieved efficiency savings
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and Arran acute
hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence and
vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
The IJBs and the Health Board work closely in partnership to maintain service and improve
performance. Initial work has commenced to develop a joint strategic commissioning plan for the
provision of unscheduled care services, which will outline these services will be delivered over the
medium-term using the set aside resources available. The ambition being to support a shift in the
balance of care into the community and support a reduction in the number of acute beds.
The ability to plan with the overall resource for defined populations and user groups and to use
budgets flexibly is one of the hallmarks of integrated care.
Each Health Board, in partnership with the Local Authority and IJB, must fully implement the
delegated hospital budget and set aside budget requirements of the legislation, in line with the
statutory guidance published.
The full implementation of the set aside arrangements is key to delivering a commitment to
planning across the whole unplanned care pathway and partnerships must ensure that set aside
arrangements are fit for purpose and enable this approach.
Ayrshire Finance Leads have developed and agreed on a new model for costing the set aside
arrangements, based on actual bed usage and average costs. A baseline level of usage has been
agreed based on the average actual use across years 2016-2017 to 2019-2020, the last four
years prior to the pandemic. A pan-Ayrshire Joint Commissioning Plan is currently under
121

Page 122

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        30
development; this will outline the level of acute unscheduled care provision that each of the IJBs
want to commission from the Health Board. 
The NHS AA Chief Executive has requested the development of a joint strategic commissioning
plan to enable the setting of directions to provide to NHS Ayrshire and Arran for Unscheduled
Care, aligned with the Set Aside resources. Furthermore, seeking the support from the 3 IJBs in
the review, and onward approving and monitoring of the delivery of a Strategic Commissioning
Plan in line with the provisions laid out in the Integration Schemes, as outlined below:
• The NHS Board will consult with the Ayrshire Integration Joint Boards to ensure that any
overarching Strategic Plan for Acute Services and any plan setting out the capacity and
resource levels required for the Set Aside budget for such Acute Services is appropriately
coordinated with the delivery of Services across the Ayrshire and Arran area. The parties
shall ensure that a group including the Director for Acute Services and Chief Officers of the
three Ayrshire Integration Joint Boards will meet regularly to discuss such issues.
• The initial Set Aside base budget for each Integration Joint Board will be based on their
historic use of Acute Services. The actual unit cost which would apply as part of any
change to activity or service redesign is dependent on the scale of change planned and
requires agreement in advance by all Parties. Any redesign of service requires to be
agreed across the three Integration Joint Boards and be reflected in the Strategic Plans.
• In year pressures in respect of Set Aside budgets will be managed in year by the Health
Board, with any recurring over or underspend being considered as part of the annual
budget setting process.
In this joint strategic commissioning plan each IJB will consider and outline a clear framework for
commissioning, at a strategic level, the urgent and unscheduled care service funded from the ‘set
aside’ budget.
There is an ambition that the commissioning plan will indicate an expectation of service delivery
that will see sustained and affordable improvement in relation to performance outcomes for the
citizens of Ayrshire and assure best value to support the financial balance of urgent and
unscheduled care provision through a review and system wide redesign of the preferred models of
care.
Following consideration l by the 3 IJBs, the Plan will be enacted operationally through the
mechanism of Directions by the Local Authorities and NHS Ayrshire and Arran. This work remains
ongoing and there is an opportunity to refresh this alongside the national focus on NHS Renewal
for Unscheduled Care.
Directions
The Scottish Government issued Statutory Guidance in January 2020 outlining the requirements
for the use of Directions from Integration Authorities to Health Boards and Local Authorities. The
guidance sets out how to improve practice in the issuing (by IJBs) and implementation (by Health
Boards and Local Authorities) of directions issued under the Public Bodies (Joint Working)
(Scotland) Act 2014. It supersedes the Good Practice Note on Directions issued in March 2016.
The Scottish Government worked closely with IJB Chief Officers to better understand the
diversity of practice across Scotland surrounding directions and to identify good practice. They
also discussed the use of directions with a range of local systems at regular partnership
engagement meetings, including with Health Board and Local Authority Chief Executives.
122

Page 123

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        31
The three Ayrshire HSCPs worked together to develop a template for the issuing of Directions as
a formal mechanism to communicate IJB decisions to the Councils and Health Board, and this
was implemented across the system from April 2023.
Risks
The strategic risks faced by the IJB over the medium to longer term were presented to the March
2025 IJB. There are 12 risks noted on the Strategic Risk Register, with a number of these graded
as very high or high risk. While there are a number of controls and mitigations in place there may
be further actions required to reduce the risks further in line with the level of risk tolerance. The
current Strategic Risk Register is available to view.
The risks are summarised below: 
Ref Title Gross Risk
(score
pending
further
controls)                                      
Residual Risk     
(score after
further
controls)   
SRR01 Financial Sustainability  25
Very 
High
16
High
SRR02 Infrastructure (ICT Integration) 12
High 
9
Moderate
SRR05 Transformational Change Programme 12
High 
6
Moderate
SRR06 Governance 9
Moderate
3
Low
SRR07 Demography and Inequality Pressures 16
High 
12
High
SRR08 Workforce 12 
High
9
Moderate
SRR09 Local Impact of Scottish Government Policies 16 
High
12
High
SRR12  Clinical and Care Governance 9
Moderate
9 
Moderate
SRR13 Provider Failure (commissioned services) 16
High
12
High
SRR14  Asylum Arrivals 12
High
12
High
SRR15 Risk of Harm  16 
High
16
High
SRR16 Growth and expansion of specialist complex
care developments  25
Very High
15
High 
123

Page 124

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        32
These risks emphasise the importance of effective planning and management of resources. It is
therefore crucial that we focus on early intervention, prevention and recovery if we are to work
within the total delegated partnership budget.
Going forward, we will continue to ensure local people are supported to get the right care in the
right place, developing clear health and care pathways for the people of North Ayrshire. To
achieve its vision, the Partnership recognises it cannot work in isolation. The Partnership will
continue to strengthen relationships with colleagues within the Community Planning Partnership
to ensure a joint approach to improving the lives of local people.
Most importantly, the Partnership must work closer with local people and maximise the use of
existing assets within communities to improve the overall health and wellbeing of people in North
Ayrshire. 2025-2026 will see the progression of the implementation of the longer-term Strategic
Plan and Transformation Plan. We will also continue the development of self-directed support,
instilling an enablement ethos promoted by our professionals, collaborating with the third and
independent sector to design and commission appropriate models of service.
Conclusion
2024-2025 has been an extremely challenging year for the partnership financially, driven by the
cost of delivering services to meet demand across the system. There has been a requirement to
draw on the remaining unearmarked reserves and also seek additional funding from North
Ayrshire Council and NHS Ayrshire & Arran. This is not a sustainable approach. 
The IJB has a strong track record in delivering approved savings. The IJB will continue to pursue
transformational change in how it supports individuals, families and communities to live
independently from statutory services for as long as they can safely do so. This is not just about
changing the ways in which services are structured but will require a change in how they are
planned and delivered, and will inevitably, unless further national investment is forthcoming,
reduce the level of service provision available in North Ayrshire for our residents. 
Our health and social care services should reflect and respond to the needs of local people. To
support this, we will help to build greater capacity in our communities and provide more ways for
service users and local people to share their views with us to help shape services. We are fully
committed to planning and designing services together with local people, our staff and our key
partners including acute health services, housing, community planning and the third and
independent sectors.
The IJB, through the Strategic Plan, outlines the belief that together we can transform health and
social care services to achieve the joint vision for the future “all people who live in North Ayrshire
are able to have a safe, healthy and active life.” A new Transformation Plan 2024-2027 was
agreed by the IJB in March to support the redesign of services and to assist with meeting the
financial challenges ahead.
Moving into 2025-2026, we are working proactively to address the financial challenges, while at
the same time, providing high-quality and sustainable health and social care services for the
communities in North Ayrshire.
Where to find more information
If you would like more information on IJB strategies, plans and policies and our performance and
spending, please refer to the North Ayrshire Health and Social Care Partnership website  
124

Page 125

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        33
Statement of responsibilities
Responsibilities of the IJB
The IJB is required to:
• Make arrangements for the proper administration of its financial affairs and to secure that
the proper officer of the board has responsibility for the administration of those affairs
(Section 95 of the Local Government (Scotland) Act 1973). In this authority, that officer is
the Chief Finance Officer
• Manage its affairs to secure economic, efficient and effective use of resources and
safeguard its assets
• Ensure the annual financial statements are prepared in accordance with legislation (The
Local Authority Accounts (Scotland) Regulations 2014), and so far, as is compatible with
that legislation, in accordance with proper accounting practices (section 12 of the Local
Government in Scotland act 2003)
• Approve the Annual Accounts for signature.
Joyce White
IJB Chair  
125

Page 126

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        34
Responsibilities of the Chief Finance Officer 
The Chief Finance Officer is responsible for the preparation of the IJB’s Annual Accounts in
accordance with proper practices as required by legislation and as set out in the CIPFA/LASAAC
Code of Practice on Local Authority Accounting in the United Kingdom (the Accounting Code).
In preparing the annual accounts, the Chief Finance Officer has:
• Selected suitable accounting policies and then applied them consistently.
• Made judgements and estimates that were reasonable and prudent.
• Complied with legislation.
• Complied with the local authority Code (in so far as it is compatible with legislation).
The Chief Finance Officer is also required to:
• Keep proper accounting records which are up to date.
• Take reasonable steps to ensure the propriety and regularity of the finances of the
Integration Joint Board.
I certify that the financial statements give a true and fair view of the financial position of the North
Ayrshire Integration Joint Board as at 31 March 2025, and its income and expenditure for the
period then ended. 
Eleanor Currie CPFA
Chief Finance Officer  
126

Page 127

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        35
Annual Governance Statement
The Annual Governance Statement explains how North Ayrshire IJB
complies with the Code of Corporate Governance and meets the
requirements of the CIPFA / SOLACE Framework ‘Delivering Good
Governance in Local Government 2016’ and the ‘Code of Practice
for Local Authority Accounting in the UK: A Statement of
Recommended Practice’, in relation to the Statement on the System
of Internal Financial Control.
Scope of responsibility
North Ayrshire IJB is responsible for ensuring that its business is conducted in accordance with
the law and proper standards, and that public money is safeguarded and properly accounted for
and used economically, efficiently and effectively.
The IJB is also responsible for putting in place proper arrangements for the governance of its
affairs and facilitating the effective exercise of its functions, which includes arrangements for the
management of risk.
In discharging this responsibility, the Chief Officer has put in place arrangements for governance
which includes the system of internal control. Reliance is placed on these controls which are
designed to manage risk to a reasonable level but cannot eliminate the risk of failure to achieve
policies, aims and objectives. It can therefore only provide reasonable but not absolute assurance
of effectiveness.
Purpose of the governance framework
The governance framework comprises the systems and processes, and culture and values by
which the IJB is directed and controlled and the activities through which it accounts to and
engages with the community. It enables the IJB to monitor the achievement of its strategic
priorities and to consider whether those priorities have led to the delivery of appropriate, cost-
effective services.
The system of internal control is a significant part of that framework and is designed to manage
risk to a reasonable level. The system of internal control is based on an ongoing process designed
to identify and prioritise the risks to the achievement of North Ayrshire IJB’s policies, aims and
objectives, to evaluate the likelihood of those risks being realised and the impact should they be
realised, and to manage them efficiently, effectively and economically.  
127

Page 128

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        36
Governance framework
The main features of the governance framework that was in place during 2024-2025 are
summarised below:
• The IJB, comprising all IJB Board members, was the key decision-making body. The
Performance and Audit Committee considered all matters in relation to Internal and
External Audit, Risk Management and Performance and fulfilled the requirements of the
CIPFA document ‘Audit Committees: Practical Guidance for Local Authorities and Police.’
• Strategic decision-making is governed by the IJB’s key constitutional documents including
the Integration Scheme, standing orders, scheme of administration, scheme of delegation
to officers and financial regulations.
• The Integration Scheme sets out the process to determine financial contributions by
partners to Integration Joint Boards. This has been supplemented by directives from the
Scottish Government in relation to the level of resources for delegation by the Council and
NHS Board for Health and Social Care Integration.
• The IJB’s purpose and vision are outlined in the IJB Strategic Commissioning Plan 2022-
2030 which links closely to the vision of the North Ayrshire Community Planning Partnership
and the Local Outcome Improvement Plan (LOIP) 2022-30 and is underpinned by an
annual action plan and performance indicators. Quarterly performance reports are provided
to the Performance and Audit Committee on the delivery of the values and strategic
priorities set out in the strategic plan, with a formal Annual Performance Report published
each year.
• The performance management framework focuses firmly on embedding a performance
management culture throughout the IJB. Regular reporting to Board Members takes place.
• A risk management strategy, strategic risk register and risk appetite statement is in place
for the IJB. The second version of the risk appetite statement was approved by the IJB in
November 2023. Future reviews of the risk appetite statement will routinely be conducted
alongside the triennial review of the risk management strategy, with the next one due in
June 2025. It may be reviewed in the interim in the event of an urgent need. The strategic
risk register is updated annually, with the operational risk registers updated in line with the
IJB’s risk strategy.
• The Health and Care Governance Framework covers governance arrangements in relation
to complaints and customer feedback, risk management, health and safety, Internal Audit,
workforce planning and public protection. Regular updates are provided to the IJB by the
Clinical and Care Governance Group.
• The IJB has adopted a ‘Code of Conduct’ for all its Board Members and employees, a
register of interests is in place for all Board members and senior officers.
• The IJB has in place an informal development programme for all Board Members, the
Partnership Senior Management Team and senior managers across the Partnership.
• There have been several changes in membership of the IJB over the course of 2024-2025
so refresher training on Code of Conduct is planned as well as an updated induction pack
for new IJB members.
• In order to facilitate greater scrutiny of the financial position, the IJB agreed to establish a
‘Finance Working Group’, chaired by the IJB Vice Chair. This group will facilitate increased
oversight and scrutiny of the financial position and transformation programme as well as
128

Page 129

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        37
detailed budget planning for future financial years and will become part of our regular
governance arrangements.
• Performance and Personal Development schemes are in place for all staff, the aim of which
is to focus all staff on their performance and development that contributes towards
achieving service objectives.
• The Strategic Planning Group has oversight of developing and monitoring the Strategic
Plan, and the Locality Planning process, as well as enabling strategies to maintain a
consistent strategic approach. SPG is chaired by the Vice Chair of the IJB and the IJB
receives copies of the minute to keep Board members informed of its activity.
• The IJB has established five locality planning review groups, reflecting the previously
agreed local planning areas, and has an integrated approach with the Community Planning
Partnership for Locality Planning in Arran. These provide Board Members, health and social
care staff and local community representatives with the opportunity to be involved in
considering and influencing priorities for each area.
• A Transformation Board is in place, which recognises the significant change programme
which is required to support delivery of the priorities within the new 2022-30 strategic plan.
Terms of Reference are in place which detail the Board’s membership, duties, authority,
reporting and governance. The Board meets monthly.
The governance framework was in place during the period ended 31 March 2025.
Review of effectiveness
North Ayrshire IJB has responsibility for conducting, at least annually, a review of the effectiveness
of its governance framework including the system of internal control. The review of the
effectiveness of the framework is informed by the work of the Partnership Senior Management
Team who have responsibility for development and maintenance of the governance environment,
the annual report by the Chief Internal Auditor and reports from Audit Scotland and other review
agencies.
The Chief Internal Auditor reports directly to the IJB Performance and Audit Committee on all audit
matters, with the right of access to the Chief Officer, Chief Finance Officer and Chair of the
Performance and Audit Committee on any matter. In accordance with the principles of the code of
corporate governance, regular reports were made to the IJB’s Performance and Audit Committee
during 2024-2025.
The Internal Audit function has independent responsibility for examining, evaluating and reporting
on the adequacy of internal control. During 2024-2025, the Internal Audit team operated in
accordance with the Public Sector Internal Audit Standards.
The Chief Internal Auditor is responsible for forming an annual opinion on the adequacy and
effectiveness of the systems of internal control.
The approved IJB internal audit plan for 2024-2025 focussed on a review of the IJB’s
arrangements in relation to Transformation, with the assignment concluding with reasonable
assurance.
It is the opinion of the Chief Internal Auditor that the systems of internal control relied upon by the
IJB continue to provide reasonable assurance against loss.  
129

Page 130

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        38
System of internal financial control
The governance framework described operates on the foundation of internal controls. The system
of internal financial control is based on a framework of regular management information, financial
regulations, administrative procedures (including segregation of duties), management supervision,
and a system of delegation and accountability.
Development and maintenance of these systems is supported by NHS Ayrshire and Arran and
North Ayrshire Council in relation to the operational delivery of health and social care services.
These systems include:
• Financial regulations and codes of financial practice
• Comprehensive budgeting systems
• Regular reviews of periodic and annual financial reports that indicate financial performance
against the forecasts
• Setting targets to measure financial and other performance
• Formal project management disciplines
• A Transformation Board to provide further scrutiny of service re-design and financial
delivery
• An effective Internal Audit function
The IJB’s financial management arrangements conform to the governance requirements of the
CIPFA statement: ‘The Role of the Chief Finance Officer in Local Government (2016)’.
The IJB complies with the CIPFA Financial Management Code.
Through the counter fraud arrangements that are in place within NHS Ayrshire and Arran and
North Ayrshire Council, the IJB conforms with the CIPFA ‘Code of Practice on Managing the Risks
of Fraud and Corruption.’
During 2024-2025, the Head of Service (Finance and Transformation) led on improvement work to
review and tighten controls across a number of areas in the HSCP.
Developments during 2024-2025
The elements noted below incorporate progress with the further actions or developments identified
in the 2024-2025 Annual Accounts.
Medium-Term Financial Outlook (MTFO)
A medium-term financial outlook was prepared covering the period 2025-2026 to 2026-2027 and
presented to the IJB in March 2024. An MTFO update was provided to the IJB on 12 December
2024 and was included in the 2025-2026 budget paper which was approved by the Council on 26
February 2025. A full update report will therefore be presented to the IJB by September 2025,
covering the period 2026-2027 to 2027-2028.
Review of IJB key governance documents
The IJB continues to review its key governance documents on a rolling basis.  
130

Page 131

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        39
Clinical and Care Governance Group (CCGG)
Clinical and Care Governance is the system in which the HSCP is accountable for continuously
improving quality and safeguarding high standards of care. The Partnership has developed
Clinical and Care Governance arrangements in line with the commitments and requirements
contained in the Integration Scheme.
The CCGG meets on a monthly to discuss and review a number of topics and an annual report
was provided to the IJB in September 2024.
Care Home and Care at Home Oversight Arrangements
The HSCP stepped up oversight arrangements for Care Homes and Care at Home Services in
North Ayrshire as part of the accountability and assurances sought by Scottish Government during
the Covid pandemic; these forums have been invaluable to oversee the quality and sustainability
of provision in North Ayrshire and as such both groups now remain part of the core governance
structure.
These multi-disciplinary groups are made up of key clinical and care professionals who have a
lead role in the oversight of care and support services based in the North Ayrshire area.
Carer’s Strategy 2023-2025
One of the responsibilities of the Carer’s (Scotland) Act 2016 is a duty for a local carer strategy
and the establishment and maintenance of an information and advice service for carers resident or
caring for someone in the local authority area.
The Carer’s Strategy 2023-2025 “Building Caring Communities” was approved by the IJB in
August 2023, with the priorities being taken forward with the new strategic partner, Unity
Enterprise. Updates on the progress of the strategy were reported to the IJB in May and
December 2024.
Children’s Services Plan 2023-2026
The Children’s Services Plan 2023-2026 was approved by the IJB in June 2023, and builds on the
progress made since the previous Children’s Services Plan 2020-2023.
The Children’s Services Plan is aligned to the Children’s Poverty Strategy and Action Plan and
Children’s Rights Report, together forming the suite of children’s services planning documents.
The plan identifies five priorities in order to achieve the vision “For all our children and young
people to have the best start in life and for North Ayrshire to be the best place in Scotland to grow
up”. These priorities are:
• The rights of children and young people are promoted and protected
• Acting early to improve what happens next
• Making Things Fairer
• Promoting good mental health and wellbeing
• Inspiring children and young people to be active.  
131

Page 132

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        40
A range of actions aligned to the Children’s Services Plan priorities are in place, with progress
reporting against these actions provided in line with agreed timescales. The 2024-2025
performance report will be submitted to the IJB in June 2025. The Scottish Government recently
undertook a review of the Plan against the statutory guidance and an individual feedback report
received which provides assurance of the alignment of the plan with national statutory guidance,
noting areas of strength and improvement.
Equality Outcomes Plan 2022-2025 / Equality Mainstreaming and Outcomes
Reporting
Following the approval of the Equality Outcomes Plan 2022-25 by the IJB in March 2023, there is
a specific duty within the Equality Act that the HSCP must publish a mainstreaming and outcomes
report detailing how the HSCP has progressed against its Equality Outcomes.
Reporting of Equality Mainstreaming and Outcomes commenced in May 2023 with the purpose of
demonstrating how, as a public sector organisation, the HSCP will mainstream equality work into
day-to-day practice. This reporting demonstrates positive progress towards the mainstreaming of
the Public Sector Equality Duty (PSED) and the identified Equality Outcomes. A further Equality
Mainstreaming and Outcomes report was presented to the IJB in May 2024.
Transformation Plan 2024-2027
The HSCP Transformation Plan for 2024-2027 was approved by the IJB in March 2024. This is an
ambitious programme of change which consists of a range of improvement and reform projects
across all service areas, each aiming to improve the quality of service and contribute to the long-
term sustainability of health and care in North Ayrshire. The Transformation Plan links closely to
the high-level aspirations which are set out in the Strategic Plan and is mapped to one or more key
drivers (savings/overspend reduction, investment, improving quality and safety, and national or
local policy).
The Transformation Plan will be overseen by the HSCP Transformation Board who will provide
assurance on progress and effectiveness to the IJB. Updates on the Transformation Plan were
reported to the IJB in September 2024 and February 2025.
NAHSCP Learning & Development Strategy (Social Work & Social Care) 2023-
2028 “Be the Best You Can Be”
The Learning & Development Strategy, which was approved by the IJB in October 2023,
consolidates the HSCP Offer of development opportunities and the need to ensure the workforce
feels valued and supported in meaningful ways. The strategy takes cognisance of current and
ongoing workstreams and agendas in the HSCP. It also considers the professional and technical
learning & development needs of the social work/care workforce operating within the HSCP.  
132

Page 133

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        41
The Key elements for consideration in implementing this strategy are:
• Continuous Professional Learning (CPL) requirements of social work practitioners aligned
to SSSC re -registration criteria
• Known requirements related to care inspectorate inspections of services
• Policy and procedural requirements/development and drivers relevant to social work
practice both locally and nationally
• Operational Service Plans
• Service redesign, improvement, quality assurance and cultural activity.
Membership of IJB
There has been stability in the roles of Chair and Vice Chair throughout 2024-2025 and these
positions will rotate in May 2025 per the IJB Standing Orders. The Chair and Vice Chair of the
Performance and Audit Committee will also rotate in 2025.
During 2024-2025, the following new members have been appointed to the IJB.
• Councillor Tom Marshall replaced Councillor Timothy Billings following his resignation from
the IJB.
• Sharon Morrow has replaced Jean Ford as a new non-Executive NHS Ayrshire and Arran
member of IJB and has also agreed to join the Performance and Audit Committee
• Paul Smith has been appointed to the IJB as the Carer Representative and Barbara
McNeice appointed as his deputy. 
Chief Officers
Paul Doak left in January 2025 and Eleanor Currie was appointed Interim Chief Finance Officer
pending the post being recruited to a permanent basis. Eleanor Currie was appointed to this post
on a permanent basis on 23 June 2025.
Annual Performance Report
The IJB endorsed the Annual Performance Report for 2023-2024 at the meeting in August 2024.
This report outlined the performance of the Health and Social Care Partnership and how it
delivered against the strategic priorities and the national outcomes.
Quarterly performance reports are published on the Partnership’s website once they have been
reviewed by the Performance and Audit Committee. This supports a commitment to make more
performance information accessible and available for public scrutiny.
Workforce Planning and Engagement
The HSCP published its current Workforce Plan (2022-25) in October 2022, in line with Scottish
Government timescales.  
133

Page 134

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        42
The Workforce Plan focusses on the five pillars of workforce planning identified by the Scottish
Government. From these, the HSCP identified our own local workforce priorities that map directly
to the five pillars. They are:
• Understanding our workforce (PLAN).
• Promoting our organisation (ATTRACT).
• Investing in our people (TRAIN).
• Building our Workforce (EMPLOY).
• Growing our people (NURTURE).
The two-year progress report was presented to Performance and Audit Committee in January
2025, where positive progress against the 31 actions within the plan were noted.
The annual iMatter Staff Experience survey took place in June 2024, providing all staff the
opportunity to provide feedback on their experiences of working in the Health and Social Care
Partnership. Overall iMatter seeks to measure how engaged staff are in the workplace. The
response rate for the 2024 survey was 58% which is the lowest rate in the last 5 years, and a drop
from the 65% response rate from the previous year. However, the HSCP reported an engagement
index of 81, the same as the previous year when it was the highest ever score.
Pan Ayrshire Integration Work
The Head of Service (Finance and Transformation) of the North Ayrshire IJB chaired a working
group which was re-established with a view to addressing some of the more significant work
required by the proposals made in the Scottish Government Ministerial Steering Group (MSG)
review of progress with integration.
The working group includes representatives from NHS Ayrshire and Arran and the three Ayrshire
IJBs:
• Directions – directions have been implemented since the beginning of 2023-2024 for
decisions made by the IJB which impact on the service delivery of the Health Board and/or
the Council.
• Joint commissioning plan and set aside budgets – work is being taken forward around the
development of a joint commissioning plan by colleagues from NHS Ayrshire and Arran and
the three Ayrshire HSCPs. Alongside this, Finance Leads have developed a set aside
model to determine the cost of large hospital services which are being used by each of the
HSCPs.
In addition, work has commenced locally to review the Integration Scheme, in close liaison with
the other Ayrshire HSCPs in order to remain consistent and support the Health Board in working
with all IJBs. A number of workstreams have been established, overseen by a programme board
which is co-chaired by the chief executives of NHS Ayrshire and Arran and East Ayrshire Council.  
134

Page 135

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        43
Further actions for 2025-2026
The IJB has identified the following actions for 2025-2026 that will assist with the further
strengthening of corporate governance arrangements:
• Develop commissioning plans and associated directions in relation to the acute set-aside
resources.
• Support the Local Authorities and NHS Board with the requirement for a Pan Ayrshire
Review of the Integration Scheme(s).
• Develop a Strategic Needs Assessment to inform the refresh of the Strategic Plan and
ensure the HSCP has a renewed approach to addressing long-term challenges
• Develop locality plans for each locality planning area to ensure a local community approach
to identifying and addressing priorities.
• Refresh the Partnership’s Participation and Engagement Strategy, identifying a programme
of work that will ensure local people are able to participate in the planning and improvement
of health and social care services.
• Following the development of the MTFP for 2026-2027 onwards and the financial
challenges anticipated, develop a robust approach to developing service plans and the
transformation plan to ensure future financial and service sustainability.
• Given the scale of the financial challenges and volatility of capacity and demand across
services, further refine financial monitoring arrangements and ensure robust governance,
reporting and development of financial recovery plans where required.
• Embed health and care governance arrangements, ensuring robust arrangements in place
across all areas of service with appropriate escalations through formal governance forums,
ensuring these reflect the new Health and Care Staffing Act requirements.
Assurance
Subject to the above, and on the basis of the assurances provided, we consider the governance
and internal control environment operating during 2024-2025 to provide reasonable and objective
assurance that any significant risks impacting on the achievement of our actions will be identified
and actions taken to avoid or mitigate their impact.
Systems are in place to continually review and improve the governance and internal control
environment and action plans are in place to address identified areas for improvement.
The Annual Governance Statement explains how North Ayrshire IJB complies with the Code of
Corporate Governance and meets the requirements of the CIPFA / SOLACE Framework
‘Delivering Good Governance in Local Government 2016’ and the ‘Code of Practice for Local
Authority Accounting in the UK: A Statement of Recommended Practice’, in relation to the
Statement on the System of Internal Financial Control. The Annual Governance Statement was
approved by the IJB Performance and Audit Committee on 27 June 2025.
Caroline Cameron, Chief Officer
Joyce White, IJB Chair  
135

Page 136

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        44
Remuneration report
This remuneration report is provided in accordance with the Local Authority Accounts (Scotland)
Regulations 2014. It discloses information relating to the remuneration and pension benefits of
specified IJB members and staff.
The information in the tables below is subject to external audit. The explanatory text in the
Remuneration Report is reviewed by the external auditor to ensure it is consistent with the
financial statements.
Remuneration: IJB Chair and Vice Chair
The IJB comprises eight voting members appointed through nomination in equal numbers by NHS
Ayrshire and Arran and North Ayrshire Council. A Chair and Vice Chair are appointed in
accordance with the Integration Scheme and the Public Bodies (Joint Working) (Integration Joint
Boards) (Scotland) Order 2014. As required in Article 4 of the Order the nomination of the IJB
Chair and Vice Chair post holders alternates between a Council and Health Board representative,
with the Vice Chair appointment by the constituent authority which did not appoint the Chair. 
The IJB does not provide any additional remuneration to the Chair, Vice Chair or any other board
members relating to their role on the IJB. The IJB does not reimburse the relevant partner
organisations for any voting board member costs borne by the partner. There were no taxable
expenses paid by the IJB. Therefore, no remuneration disclosures are provided for the Chair or
Vice Chair.
The IJB does not have responsibilities, either in the current year or in future years, for funding any
pension entitlements of voting IJB members. Therefore, no pension rights disclosures are provided
for the Chair or Vice Chair.
Remuneration: Senior Officers of the IJB
The IJB does not directly employ any staff in its own right, however specific post-holding officers
are non-voting members of the Integration Joint Board.
Chief Officer and Chief Finance Officer
The appointment of an Integration Joint Board Chief Officer is required by section 10 of the Public
Bodies (Joint Working) (Scotland) Act 2014 which includes the statement “an Integration Joint
Board is to appoint, as a member of staff, a chief officer”.
The Chief Officer for the IJB has to be appointed and the employing partner has to formally
second the officer to the IJB. The employment contract for the Chief Officer adheres to the
legislative and regulatory framework of the employing partner organisation. The remuneration
terms of the Chief Officer’s employment are approved by the IJB.
As the IJB is constituted as a Local Government body as set out by Section 106 of the Local
Government (Scotland) Act 1973, it also requires to appoint an officer responsible for the proper
administration of its financial affairs, the Chief Finance Officer (Section 95 Officer).  
136

Page 137

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        45
Other Officers
No other staff are appointed by the IJB under a similar legal regime. Non-voting board members
who meet the criteria for disclosure are included in the tables below.
2023-2024
Total
Remuneration
£
Name and Post Title
2024-2025
Salary, fees
and
allowances
£
2024-2025
Taxable
Expenses
£
2024-2025
Total
Remuneration
£
129,076 Caroline Cameron,
Chief Officer
1 April 2024 to 31 March 2025
Employing organisation: North
Ayrshire Council
133,720 0 133,720
99,067 Paul Doak
Chief Finance Officer
1 April 2024 to 19 January 2025
Employing organisation: North
Ayrshire Council 
81,807 0 81,807
0 Eleanor Currie
Interim Chief Finance Officer
6 January 2025 to 31 March 2025
Employing organisation: North
Ayrshire Council
21,814 0 21,814
*The full year equivalent salaries are given in the table below.
Name and post title
2024-2025
Full Year Salary 
£
Paul Doak, Chief Finance Officer, 1 April 2024 to 19 January 2025 102,630
Eleanor Currie, Interim Chief Finance Officer, 6 January to 31 March 2025
(salary and responsibility allowance)
80,827
In respect of officers’ pension benefits the statutory liability for any future contributions to be made
rests with the relevant employing partner organisation. On this basis there is no pensions liability
reflected on the IJB balance sheet for the Chief Officer or any other officers.
The IJB however has responsibility for funding the employer contributions for the current period in
respect of the officer time spent on fulfilling the responsibilities of their role on the IJB. The
following table shows the IJB’s funding during the period to support officers’ pension benefits. The
table also shows the total value of accrued pension benefits which may include benefits earned in
other employment positions and from each officer’s own contributions.  
137

Page 138

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        46
In Period pension contributions 
Officer 2023-2024
(£)
2024-2025
(£)
Caroline Cameron, Chief Officer 24,493 7,777
Paul Doak, Chief Finance Officer 19,120 5,317
Eleanor Currie, Interim Chief Finance Officer 0 1,314
Accrued pension benefits
Officer  Type of benefit 2023-2024
(£)
2024-2025
(£)
Caroline Cameron, Chief Officer  Pension  13,727 17,065
Caroline Cameron, Chief Officer  Lump Sum 0 0
Paul Doak, Chief Finance Officer Pension  47,661 46,079
Paul Doak, Chief Finance Officer Lump Sum 69,717 71,734
Eleanor Currie, Interim Chief Finance Officer Pension  0 40,319
Eleanor Currie, Interim Chief Finance Officer Lump Sum 0 45,392
Disclosure by pay bands
As required by the regulations, the following table shows the number of persons whose
remuneration for the period was £50,000 or above, in bands of £5,000.
Number of employees in band
2023-2024
Remuneration band Number of employees in band 
2024-2025
0 £130,000 to £134,999 1
1 £125,000 to £129,999 0
1 £95,000 to £99,999 0
0 £90,000 to £94,999 0
0 £80,000 to £84,999 1
Exit packages
There were no exit packages during 2023-2024 or 2024-2025. 
Caroline Cameron, Chief Officer
Joyce White, IJB Chair  
138

Page 139

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        47
Financial statements
The Comprehensive Income and Expenditure Statement shows the cost of providing services
for the period according to accepted accounting practices.
2023-2024
Gross Exp
£000
2023-2024
Gross
Income
£000
2023-2024
Net Exp
£000
Area of Service 2024-2025 
Gross Exp
£000
2024-
2025
Gross
Income
£000
2024-
2025
Net Exp    
£000
97,275 0 97,275 Community Care
and Health
98,181 0 98,181
35,764 0 35,764 Mental Health 38,208 0 38,208
44,318 0 44,318 Children’s
Services and
Criminal Justice
45,634 0 45,634
52,863 0 52,863 Primary Care 53,662 0 53,662
12,849 0 12,849 Management and
Support Costs
13,365 0 13,365
1,236 0 1,236 Change
Programme 
0 
10,098 0 10,098 Allied Health
Professionals
10,749 0 10,749
108,607 0 108,607 Lead Partnership
and Set Aside
120,555 0 120,555
1,317 0 1,317 Chief Social Work
Officer
1,725 0 1,725
364,327 0 364,327 Cost of Services 382,079 0 382,079
0 (124,933) (124,933) North Ayrshire
Council Funding
0 (135,243) (135,243)
0 (228,176) (228,176) NHS Ayrshire and
Arran Funding
0 (244,487) (244,487)
0 (353,109) (353,109) Total Taxation
And Non-
Specific Grant
Income (note 5)
0 (379,730) (379,730)
364,327 (353,109) 11,218 (Surplus) or
Deficit on
Provision of
Services 
382,079 (379,730) 2,349
There are no statutory or presentation adjustments which affect the IJB’s application of the funding
received from partners. The movement in the General Fund balance is therefore solely due to the
transactions shown in the Comprehensive Income and Expenditure Statement. Consequently, an
Expenditure and Funding Analysis is not provided in these annual financial statements.  
139

Page 140

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                        48
The Movement in Reserves Statement shows the movement in the period on the reserves held
by the IJB. The movements which arise due to statutory adjustments which affect the General
Fund balance are separately identified from the movements due to accounting practices. In 2024-
2025 there were no statutory adjustments. Note 8 to the accounts provides more detail on the
movement in reserves.
Total Reserves
2023-2024
Movement in reserves  General
Fund –
Debt to
NAC
2024-2025
General
Fund
2024-
2025
Earmarked
Reserves
2024-2025
Total
Reserves
2024-2025
16,728 Opening balance as at 1
April 0 357 5,153 5,510
(11,218) Total Comprehensive
Income and Expenditure  0 (357) (1,992) (2,349)
0
Adjustments between
accounting basis and
funding basis under
regulations
0 0 0 0
(11,218) Increase\ (Decrease) in
period 0 (357) (1,992) (2,349)
5,510 Closing Balance as at
31 March  0 0 3,161 3,161
The Balance Sheet shows the value of the IJB’s assets and liabilities as at the balance sheet
date. The net assets of the IJB (assets less liabilities) are matched by the reserves held by the
IJB.
31 March 2024
£000
Balance Sheet Description Notes 31 March 2025
£000
5,510 Short Term Debtors 6 3,161
0 Long Term Creditors 7 0
5,510 Net Assets Not
applicable
3,161
5,510 Usable Reserve: General Fund 8 3,161
5,510 Total Reserves Not
applicable
3,161
The Statement of Accounts present a true and fair view of the financial position of the Integration
Joint Board as at 31 March 2025 and its income and expenditure for the period then ended.
The unaudited financial statements were authorised for issue on 27 June 2025.
Eleanor Currie CPFA, Chief Finance Officer
140

Page 141

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       49
Notes to the financial statements
Note 1 – Significant Accounting Policies
General principles
The Financial Statements summarise the authority’s transactions for the 2024-2025 financial
period and its position at the period-end as at 31 March 2025.
The North Ayrshire IJB was established under the requirements of the Public Bodies (Joint
Working) (Scotland) Act 2014 and is a Section 106 body as defined in the Local Government
(Scotland) Act 1973.
The Financial Statements are therefore prepared in compliance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2024-2025, supported by International Financial
Reporting Standards (IFRS), unless legislation or statutory guidance requires different treatment.
The accounts are prepared on the going concern basis, which provides that the entity will continue
in operational existence for a minimum of 12 months from the date of these accounts. In
accordance with the Code, the going concern concept will apply as there is the assumed
continuation of service provision into the future.
The historical cost convention has been adopted.
Accruals of expenditure and income
Activity is accounted for in the period that it takes place, not simply when cash payments are made
or received. In particular:
• Expenditure is recognised when goods or services are received, and their benefits are used
by the IJB.
• Income is recognised when the IJB has a right to the income, for instance by meeting any
terms and conditions required to earn the income, and receipt of the income is probable.
• Where income and expenditure have been recognised but settlement in cash has not taken
place, a debtor or creditor is recorded in the Balance Sheet.
• Where debts may not be received, the balance of debtors is written down.
For the Integration Joint Board financial statements, a debtor and/or creditor will be recorded
where the partner contributions differ from the actual net expenditure in period, this allows any
surplus or deficit on the provision of services to be transferred to the reserves held by the
Integration Joint Board.
Funding
The IJB is primarily funded through contributions from the statutory funding partners, North
Ayrshire Council and NHS Ayrshire and Arran. Expenditure is incurred as the IJB commissions
specified health and social care services from the funding partners for the benefit of service
recipients in North Ayrshire.  
141

Page 142

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       50
Cash and cash equivalents
The IJB does not operate a bank account or hold cash. Transactions are settled on behalf of the
IJB by the funding partners. Consequently, the IJB does not present a ‘Cash and Cash Equivalent’
figure on the balance sheet. The funding balance due to or from each funding partner as at 31
March is represented as a debtor or creditor on the IJB’s Balance Sheet.
Employee benefits
The IJB does not directly employ staff. Staff are employed by the funding partners who retain the
liability for pension benefits payable in the future. The IJB therefore does not present a Pensions
Liability on its Balance Sheet.
The IJB has a legal responsibility to appoint a Chief Officer and a Chief Finance Officer. More
details on the arrangements are provided in the Remuneration Report. The charges from the
employing partner are treated as employee costs. Where material the Chief Officer’s and Chief
Finance Officer’s absence entitlement at 31 March is accrued, for example in relation to annual
leave earned but not yet taken.
Provisions, Contingent Liabilities and Contingent Assets
Provisions are liabilities of uncertain timing or amount. A provision is recognised as a liability on
the balance sheet when there is an obligation as at 31 March due to a past event; settlement of
the obligation is probable; and a reliable estimate of the amount can be made. Recognition of a
provision will result in expenditure being charged to the Comprehensive Income and Expenditure
Statement and will normally be a charge to the General Fund.
A contingent liability is a possible liability arising from events on or before 31 March, whose
existence will only be confirmed by later events. A provision that cannot be reasonably estimated,
or where settlement is not probable, is treated as a contingent liability. A contingent liability is not
recognised in the IJB’s Balance Sheet but is disclosed in a note where it is material.
A contingent asset is a possible asset arising from events on or before 31 March, whose existence
will only be confirmed by later events. A contingent asset is not recognised in the IJB’s Balance
Sheet but is disclosed in a note only if it is probable to arise and can be reliably measured.
Reserves
The Integration Joint Board’s reserves are classified as either Usable or Unusable Reserves. The
IJB’s only Usable Reserve is the General Fund. The balance of the General Fund as at 31 March
shows the extent of resources which the IJB can use in later years to support service provision.
Indemnity insurance
The IJB has indemnity insurance for costs relating primarily to potential claim liabilities regarding
Board member and officer responsibilities. NHS Ayrshire and Arran and North Ayrshire Council
have responsibility for claims in respect of the services that they are statutorily responsible for and
that they provide.
Unlike NHS Ayrshire and Arran, the IJB does not have any ‘shared risk’ exposure from
participation in CNORIS (Clinical Negligence and Other Risks Indemnity Scheme). The IJB
participation in the CNORIS scheme is therefore equivalent to normal insurance arrangements.
142

Page 143

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       51
Known claims are assessed as to the value and probability of settlement. Where it is material the
overall expected value of known claims taking probability of settlement into consideration, is
provided for in the IJB’s Balance Sheet.
The likelihood of receipt of an insurance settlement to cover any claims is separately assessed
and, where material, presented as either a debtor or disclosed as a contingent asset.
VAT Status
The IJB is a non-taxable body and does not charge or recover VAT on its functions.
Note 2 – Critical Judgements and Estimation Uncertainty
The critical judgements include:
• On behalf of all IJBs within the NHS Ayrshire and Arran area, the IJB acts as the lead partner
for Mental Health Services. It commissions services on behalf of the three Ayrshire IJBs and
reclaims the costs involved. This arrangement is treated as an agency arrangement. In the
absence of an alternative agreement or approach being outlined in the Integration Scheme,
the recharges across the partnerships for lead services are based on an NRAC share of
costs, this may not reflect the actual cost of delivering services to the population in the three
areas.
• In applying the accounting policies, the IJB has had to make a critical judgement relating to
the values included for Set Aside services. The Set Aside figure included in the IJB accounts
is the baseline of 2023-2024 bed days at 2024-2025 prices as the 2024-2025 actual usage is
not known until after the date of accounts signing. As such, the Set Aside sum included in the
accounts will not reflect the true cost of actual hospital usage in 2024-2025.
There are no material estimation uncertainties included within the Financial Statements.
Note 3 – Events after the Reporting Period
The audited annual financial statements will be authorised for issue by the Chief Finance Officer
on 25 September 2025. Events taking place after this date are not reflected in the financial
statements or notes.
Events after the Balance Sheet date are those events, both favourable and unfavourable, that
occur between the end of the reporting period and the date when the Annual Accounts are
authorised for issue. Two types of events can be identified:
• Those that provide evidence of conditions that existed at the end of the reporting period - the
financial statements are adjusted to reflect such events.
• Those that are indicative of conditions that arose after the reporting period – the financial
statements are not adjusted to reflect for such events, but where a category of events would
have a material impact disclosure is made in the notes of the nature of the events and their
estimated financial effect.
There are no such events to report for 2024-2025.  
143

Page 144

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       52
Note 4 – Expenditure and Income Analysis by Nature
2023-2024
£000s
Description 2024-2025
£000s
158,982 Services commissioned from North Ayrshire Council 163,908
205,312 Services commissioned from NHS Ayrshire and Arran 218,137
33 Auditor Fee: External Audit Work 34
(353,109) Partners Funding Contributions and Non-Specific Grant Income (379,730)
11,218 (Surplus) / deficit on the Provision of Services 2,349
Note 5 - Taxation and Non-Specific Grant Income
2023-2024
£000’s
Description 2024-2025
£000’s
(124,933) Funding Contribution from North Ayrshire Council (135,243)
(228,176) Funding Contribution from NHS Ayrshire and Arran (244,487)
(353,109) Taxation and Non-specific Grant Income (379,730)
The funding contributions from the partners shown above exclude any funding which is ring-fenced
for the provision of specific services. Such ring-fenced funding is presented as income in the Cost
of Services in the Comprehensive Income and Expenditure Statement. There was no ring-fenced
funding in 2023-2024 or 2024-2025.
The funding contribution from NHS Ayrshire and Arran shown above includes £39.966m (2023-
2024 £35.008m) in respect of ‘set aside’ resources relating to acute hospital and other resources.
These are provided by the NHS which retains responsibility for managing the costs of providing
the services. The IJB however has responsibility for the consumption of, and level of demand
placed on, these resources.
Note 6 – Debtors
31 March 2024
£000’s
Description  31 March 2025 
£000’s
5,363 North Ayrshire Council 3,161
147 NHS Ayrshire and Arran 0
5,510 Total Debtors 3,161
Amounts due from to the funding partners are stated on a net basis. Debtor and Creditor balances
recognised by the funding partners but not yet settled in cash terms are offset against the funds
they are holding on behalf of the Integration Joint Board.  
144

Page 145

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       53
Note 7 – Creditors
31 March 2024
£000’s
Description 31 March 2025 
£000’s
0 North Ayrshire Council 0
0 NHS Ayrshire and Arran 0
0 Total Creditors 0
Amounts owed to the funding partners are stated on a net basis. Debtor and Creditor balances
recognised by the funding partners but not yet settled in cash terms are offset against the funds
they are holding on behalf of the Integration Joint Board.
This position is summarised below:
Funding Partner (Surplus) or Deficit
on provision of
services
£000’s 
Movement in
Reserves
£000’s
Uncommitted
Surplus 
(funds which are not
earmarked for
specific purposes)
£000’s
North Ayrshire Council 2,465 (2,465) 0
NHS Ayrshire and Arran (116) 116 0
Total 2,349 (2,349) 0
Note 8 – Usable Reserve: General Fund
The IJB holds a balance on the General Fund which will normally comprise one of three elements:
• As a working balance to help cushion the impact of uneven cash flows.
• As a contingency to manage the impact of unexpected events or emergencies.
• As a means of building up funds, often referred to as earmarked reserve, to meet known or
predicted liabilities.
The table below shows the movements on the General Fund balance, analysed between those
elements earmarked for specific planned expenditure and the amount held in unallocated
reserves.
The ‘free’ general fund balance is £0.000m which is below the target level of a contingency
reserve of between 2% and 4%. 
145

Page 146

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       54
It is acknowledged that uncommitted reserves require to be restored to the minimum
recommended level. However, in the short-term, service pressures mean that this would not be
achievable without implementing further reductions in service delivery that would impact on the
levels of care provided and increase the levels of risk for service users.
Transfers
Out
2023-
2024
Transfers
In
2023-
2024
Balance
at 31
March
2024
Area of Reserves Transfers
Out
2024-
2025
Transfers
In
2024-
2025
Balance
at 31
March
2025
0 0 0 Earmarked Funds 0 0 0 
(715) 641 641 Alcohol & Drug Partnership (641) 353 353
(125) 57 57 Mental Health Action 15 (57) 135 135
157 0 0 Primary Care Improvement
Fund
0 46 46
(445) 0 1,774 Service Redesign / Challenge
Fund
(994) 0 780
(136) 0 377 Community Living Change
Fund
(377) 0 0
(76) 0 0 Covid19 Funding 0 0 0
(71) 0 0 NAC Recovery and Renewal
– Mental Health Element
0 0 0
(300) 0 0 West Road 0 0 0
(1,065) 0 0 Care at Home Capacity 0 0 0
(584) 0 0 Interim Care 0 0 0
(50) 0 0 Trauma Training 0 0 0
(804) 1,313 1,313 Family Wellbeing Fund (1,313) 934 934
(34) 0 0 Perinatal MH Nurse 0 0 0
0 50 50 Wellbeing Fund (50) 0 0
(644) 0 0 Multi-Disciplinary Teams 0 0 0
0 26 26 Breast Feeding Network (26) 36 36
(1,170) 546 546 MH Recovery and Renewal  (546) 365 365
(168) 23 23 Buvidal (23) 0 0
0 0 0 LD – Coming Home 0 82 82
0 0 0 Early Intervention in
Psychosis
0 92 92
0 5 5 Brooksby (5) 0 0
0 0 0 Donation – Police Scotland  0 1 1
(18) 4 4 Cossette Funding (4) 0 0
(55) 55 55 Expansion of Primary Care
Estates
(55) 0 0
(71) 63 63 GP Premises Improvements -
tranches 1 and 2
(63) 3 3
(80) 81 81 Mental Health Wellbeing in
Primary Care
(81) 0 0
0 0 0 Primary Care Improvement
Fund
0 303 303
(101) 29 29 Dental Practice Improvement (29) 29 29
(13) 0 0 Childsmile 0 0 0
0 2 2 Appropriate Adult Scheme (2) 2 2
146

Page 147

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       55
Transfers
Out
2023-
2024
Transfers
In
2023-
2024
Balance
at 31
March
2024
Area of Reserves Transfers
Out
2024-
2025
Transfers
In
2024-
2025
Balance
at 31
March
2025
0 19 19 Adult Tier 3 Weight
Management Service
(19) 0 0
0 22 22 Phlebotomy (22) 0 0
(42) 0 0 Dental Winter Preparedness 0 0 0
(126) 46 66 LD Health Checks (66) 0 0
(2,000) 0 0 2023-2024 Budget Support 0 0 0
(8,736) 2,982 5,153 Total Earmarked (4,373) 2,381 3,161
0 0 0 Outstanding Debt 0 0 0
(5,464) - 357 Unallocated General Fund  (357) 0 0
(14,200) 2,982 5,510 General Fund (4,730) 2,381 3,161
Note 9 – Agency Income and Expenditure 
On behalf of all IJBs within the NHS Ayrshire and Arran area, the IJB acts as the lead manager for
Mental Health Services. It commissions services on behalf of the other IJBs and reclaims the costs
involved. The payments that are made on behalf of the other IJBs, and the consequential
reimbursement, are not included in the Comprehensive Income and Expenditure Statement (CIES)
since the IJB is not acting as principal in these transactions.
The amount of expenditure and income relating to the agency arrangement is shown below.
2023-2024
£000
Description 2024-2025
£000
39,490 Expenditure on Agency Service – Lead Partnership 43,932
0 Expenditure on PPE and Test Kits from National
Services Scotland
0
39,490 Total agency expenditure 43,932
(39,490) Reimbursement for Agency Service – Lead
Partnership
43,932
0 Reimbursement for PPE from National Services
Scotland
0
(39,490) Total agency income 43,932
0 Net Agency Expenditure Excluded from the CIES 0  
147

Page 148

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       56
Note 10 – Related Party Transactions
The IJB has related party relationships with NHS Ayrshire and Arran and North Ayrshire Council.
In particular the nature of the partnership means that the IJB may influence, and be influenced by,
its partners. The following transactions and balances included in the IJB’s financial statements are
presented to provide additional information on the relationships.
Transactions with NHS Ayrshire and Arran
2023-2024
£000
Transactions with NHS Ayrshire and Arran 2024-2025
£000
(228,176) Funding Contributions received from NHS Board (244,487)
0 Service Income received from NHS Board 0
205,264 Expenditure on Services Provided by NHS Board 218,087
65 Key Management Personnel: Non-Voting Board
Members 67
0 Support Services 0
(22,847) Net Transactions with NHS Board (26,333)
Balances with NHS Ayrshire and Arran
31 March
2024 £000
Balances with NHS Ayrshire and Arran 31 March 2025
£000
147 Debtor Balances: Amounts due from NHS Board 0
0 Creditor Balances: Amounts due to NHS Board 0
147 Net Balances with NHS Board 0  
148

Page 149

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       57
Transactions with North Ayrshire Council
2023-2024
£000
Transactions with North Ayrshire Council 2024-2025
£000
(124,933) Funding Contributions received from the Council (135,243)
0 Service Income received from the Council 0
158,934 Expenditure on Services Provided by the Council 163,858
64 Key Management Personnel: Non-Voting Board
Members 67
0 Support Services 0
34,065 Net Transactions with the Council 28,682
Balances with North Ayrshire Council
31 March
2024
£000
Balances with North Ayrshire Council 31 March 2025
£000
5,363 Debtor Balances: Amounts due from the Council 3,161
0 Creditor Balances: Amounts due to the Council 0
5,363 Net Balances with the Council 3,161
There are key management personnel employed by NHS Ayrshire and Arran and North Ayrshire
Council; these costs are included in the expenditure on services provided. The non-voting Board
members employed by the Council and Health Board include the Chief Officer, Chief Finance
Officer, Chief Social Work Officer, representatives of primary care, nursing and non-primary care
services, and a staff representative. Details of the remuneration for some specific post-holders is
provided in the Remuneration Report.
Support services were not delegated to the Integration Joint Board through the Integration
Scheme and are instead provided by NHS Ayrshire and Arran and North Ayrshire Council free of
charge as ‘services in kind.’ These include services such as financial management, human
resources, legal services, committee services, ICT, payroll, internal audit and accommodation.  
149

Page 150

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       58
Note 11 – VAT 
VAT payable is included as an expense only to the extent that it is not recoverable from Her
Majesty’s Revenue and Customs. VAT receivable is excluded from income.
The VAT treatment of expenditure in the IJB’s financial statements depends on which of the
partner agencies is providing the service as these agencies are treated differently for VAT
purposes.
Where the Council is the provider, income and expenditure excludes any amounts related to VAT,
as all VAT collected is payable to H.M. Revenue and Customs and all VAT paid is recoverable
from it. The Council is not entitled to fully recover VAT paid on a very limited number of items of
expenditure and for these items the cost of VAT paid is included within service expenditure to the
extent that it is irrecoverable from H.M. Revenue and Customs.
Where the NHS is the provider, expenditure incurred will include irrecoverable VAT as generally
the NHS cannot recover VAT paid as input tax and will seek to recover its full cost as income from
the Commissioning IJB.
Note 12 – Accounting Standards Issued Not Yet Adopted
The Code requires the disclosure of information about accounting changes that will be required
by new accounting standards that have been issued, but not yet adopted. At the date of
authorisation of these financial statements, the IJB has not applied the following new and
revised IFRS Standards that have been issued, but are not yet effective:
• IAS 21 The Effects of Changes in Foreign Exchange Rate (Lack of Exchangeability)
issued in August 2023. The amendments clarify how an entity should assess whether a
currency is exchangeable and how it should determine a spot exchange rate when
exchangeability is lacking, as well as require the disclosure of information that enables
users of financial statements to understand the impact of a currency not being
exchangeable.
• IFRS 17 Insurance Contracts issued in May 2017. This replaces IFRS4 and sets out
principles for recognition, measurement, presentation and disclosure of insurance
contracts.
• The Changes to the Measurement of Non-Investment Assets include adaptations and
interpretations of IAS 16 Property, Plant and Equipment and IAS 38 Intangible Assets.
These include setting out three revaluation processes for operational property, plant and
equipment, requiring indexation for tangible non-investment assets and a requirement to
value intangible assets using the historical cost approach
Adoption of the Standards listed above will not impact on the 2024-2025 Annual Accounts and it
is not anticipated that the adoption of the applicable Standards will have a material impact on the
financial statements in future periods. 
150

Page 151

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       59
Glossary of Terms
While the terminology used in this report is intended to be self-explanatory, it may be useful to
provide additional definition and interpretation of the terms used.
Accounting Period
The period of time covered by the Accounts normally a period of twelve months commencing on 1
April each year. The end of the accounting period is the Balance Sheet date.
Accruals
The concept that income and expenditure are recognised as they are earned or incurred not as
money is received or paid.
Balance Sheet
A statement of the recorded assets, liabilities and other balances at the end of the accounting
period.
CIPFA
The Chartered Institute of Public Finance and Accountancy.
Consistency
The concept that the accounting treatment of like terms within an accounting period and from one
period to the next is the same.
CNORIS
The Clinical Negligence and Other Risks Indemnity Scheme
COSLA
Convention of Scottish Local Authorities
Creditor
Amounts owed by the IJB for work done, goods received or services rendered within the
accounting period, but for which payment has not been made by the end of that accounting period.
Debtor
Amount owed to the IJB for works done, goods received, or services rendered within the
accounting period, but for which payment has not been received by the end of that accounting
period.  
151

Page 152

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       60
Entity
A body corporate, partnership, trust, unincorporated association or statutory body that is delivering
a service or carrying on a trade or business with or without a view to profit. It should have a
separate legal personality and is legally required to prepare its own single entity accounts.
IFRS
International Financial Reporting Standards.
ISA
International Standard on Auditing
ISD
Information Services Division Scotland
LASAAC
Local Authority (Scotland) Accounts Advisory Committee
Liability
A liability is where the IJB owes payment to an individual or another organisation. A current liability
is an amount which will become payable or could be called in within the next accounting period
e.g. creditors or cash overdrawn. A non-current liability is an amount which by arrangement is
payable beyond the next year at some point in the future or will be paid off by an annual sum over
a period of time.
NRAC
NHS Scotland Resource Allocation Committee (Scottish NHS resource allocation formula) 
Post Balance Sheet Events
Post Balance Sheet events are those events, favourable or unfavourable, that occur between the
Balance Sheet date and the date when the Annual Accounts are authorised for issue.
Provisions
An amount put aside in the accounts for future liabilities or losses which are certain or very likely to
occur but the amounts or dates of when they will arise are uncertain.
Related Parties
Bodies or individuals that have the potential to control or influence the IJB or to be controlled or
influenced by the IJB. For the IJB’s purposes, related parties are deemed to include voting
members, the Chief Officer and their close family and household members.  
152

Page 153

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       61
Remuneration
All sums paid to or receivable by an employee and sums due by way of expenses allowances (as
far as these sums are chargeable to UK income tax) and the monetary value of any other benefits
received other than in cash.
Reserves
The accumulation of surpluses, deficits and appropriation over past years. Reserves of a revenue
nature are available and can be spent or earmarked at the discretion of the IJB.
Revenue Expenditure
The day-to-day expenses of providing services.
Significant Interest
The reporting authority is actively involved and is influential in the direction of an entity through its
participation in policy decisions.  
153

Page 154

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       62
Independent Auditor’s Report
Independent auditor’s report to the members of North Ayrshire
Integration Joint Board and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of North Ayrshire
Integration Joint Board for the year ended 31 March 2025 under Part VII of the Local Government
(Scotland) Act 1973. The financial statements comprise the Comprehensive Income and
Expenditure Statement, Movement in Reserves Statement, Balance Sheet, and notes to the
financial statements, including material accounting policy information. The financial reporting
framework that has been applied in their preparation is applicable law and UK adopted
international accounting standards, as interpreted and adapted by the Code of Practice on Local
Authority Accounting in the United Kingdom 2024/25 (the 2024/25 Code).
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the body as at 31 March
2025 and of its income and expenditure for the year then ended;
• have been properly prepared in accordance with UK adopted international
accounting standards, as interpreted and adapted by the 2024/25 Code;
and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts (Scotland)
Regulations 2014, and the Local Government in Scotland Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing
(UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts
Commission for Scotland. My responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed by the Accounts Commission on 3 April 2023. My period of appointment is five years,
covering 2022/23 to 2026/27. I am independent of the body in accordance with the ethical
requirements that are relevant to my audit of the financial statements in the UK including the
Financial Reporting Council’s Ethical Standard, and I have fulfilled my other ethical responsibilities
in accordance with these requirements. Non-audit services prohibited by the Ethical Standard
were not provided to the body. I believe that the audit evidence I have obtained is sufficient and
appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the
financial statements is appropriate.
Based on the work I have performed, I have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the body’s
ability to continue to adopt the going concern basis of accounting for a period of at least twelve
months from when the financial statements are authorised for issue.
154

Page 155

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       63
These conclusions are not intended to, nor do they, provide assurance on the body’s current or
future financial sustainability. However, I report on the body’s arrangements for financial
sustainability in a separate Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement
that I identified and my judgements thereon.
Responsibilities of the Chief Financial Officer and North Ayrshire Integration Joint Board for
the financial statements
As explained more fully in the Statement of Responsibilities, the Chief Financial Officer is
responsible for the preparation of financial statements that give a true and fair view in accordance
with the financial reporting framework, and for such internal control as the Chief Financial Officer
determines is necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
In preparing the financial statements, the Chief Financial Officer is responsible for assessing the
body’s ability to continue as a going concern, disclosing, as applicable, matters related to going
concern and using the going concern basis of accounting unless there is an intention to
discontinue the body’s operations.
The North Ayrshire Integration Joint Board is responsible for overseeing the financial reporting
process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a
whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s
report that includes my opinion. Reasonable assurance is a high level of assurance, but is not a
guarantee that an audit conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and are considered
material if, individually or in the aggregate, they could reasonably be expected to influence the
decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I design
procedures in line with my responsibilities outlined above to detect material misstatements in
respect of irregularities, including fraud. Procedures include:
• using my understanding of the local government sector to identify that the
Local Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland Act
2003 are significant in the context of the body;
• inquiring of the Chief Financial Officer as to other laws or regulations that
may be expected to have a fundamental effect on the operations of the
body;
• inquiring of the Chief Financial Officer concerning the body’s policies and
procedures regarding compliance with the applicable legal and regulatory
framework;
• discussions among my audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur; and
155

Page 156

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       64
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance with
laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the body’s controls,
and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or the
override of internal control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts manipulated,
and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities. This
description forms part of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the Remuneration
Report
I have audited the parts of the Remuneration Report described as audited. In my opinion, the
audited parts of the Remuneration Report have been properly prepared in accordance with The
Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Chief Financial Officer is responsible for the other information in the annual accounts. The
other information comprises the Management Commentary, Annual Governance Statement,
Statement of Responsibilities and the unaudited part of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether the other
information is materially inconsistent with the financial statements or my knowledge obtained in the
course of the audit or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to determine whether this gives
rise to a material misstatement in the financial statements themselves. If, based on the work I
have performed, I conclude that there is a material misstatement of this other information, I am
required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do not express
any form of assurance conclusion thereon except on the Management Commentary and Annual
Governance Statement to the extent explicitly stated in the following opinions prescribed by the
Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and
Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with the
financial statements and that report has been prepared in accordance with
156

Page 157

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       65
statutory guidance issued under the Local Government in Scotland Act
2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is consistent
with the financial statements and that report has been prepared in
accordance with the Delivering Good Governance in Local Government:
Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report
are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit. 
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best Value,
are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the
Local Government (Scotland) Act 1973 and for no other purpose. In accordance with paragraph
108 of the Code of Audit Practice, I do not undertake to have responsibilities to members or
officers, in their individual capacities, or to third parties. 
Fiona Mitchell-Knight FCA
Audit Director
Audit Scotland
4th Floor, The Athenaeum Building
8 Nelson Mandela Place
Glasgow, G2 1BT  
157

Page 158

North Ayrshire Integrated Joint Board Unaudited Annual Accounts to 31st March 2025                       66
This document is available in other formats such as audio tape, CDF, braille and
in large print. It can also be made available in other languages on request.
All of our publications are available in different languages, larger print, braille
(English only), audio tape or another format of your choice.
Comments or questions about this document, including request for support
information or documentation, should be made by email to
annualaccountsNAHSCP@north-ayrshire.co.uk
Follow us on Twitter @NAHSCP
For more information, visit the North Ayrshire Health and Social Care
Partnership website.
158

Page 159

8 Nelson Mandela Place
Glasgow 
G2 1BT 
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
25 September 2025
North Ayrshire Integration Joint Board
Audit of 2024/25 Annual Accounts
Independent auditor's report
1.  Our audit work on the 2024/25 Annual Accounts is now substantially complete. Subject to
receipt of a revised set of Annual Accounts for final review, we anticipate being able to issue
unqualified and unmodified audit opinions in the independent auditor's report following approval
of the annual accounts by the IJB on xx September 2025 (the proposed report is attached at
appendix A).
Annual audit report
2.  We also present for your consideration our proposed Annual Audit Report on the 2024/25
audit. International Standard on Auditing (ISA) 260 (Communication with those charged with
governance) requires auditors to report specific matters arising from the audit of the Annual
Accounts to those charged with governance, in sufficient time to enable appropriate action. 
3.  The Annual Audit Report will be issued in its final form after the Annual Accounts have been
approved for issue and the independent auditor’s report has been signed.
4.  The Annual Audit Report also sets out conclusions from our consideration of the four audit
dimensions that frame the wider scope of public audit as set out in the Code of Audit Practice.
Unadjusted misstatements
5.  There are no unadjusted misstatements.
Fraud, subsequent events and compliance with laws and regulations
6.  In presenting this report to the IJB we seek confirmation from those charged with governance
of any instances of any actual, suspected, or alleged fraud; any subsequent events that have
occurred since the date of the financial statements; or material non-compliance with laws and
regulations affecting the entity that should be brought to our attention.
Representations from management
7.  As part of the completion of our audit, we are seeking written representations from the Chief
Financial Officer, as the “proper officer” appointed by virtue of section 95 of the Local
Government Scotland Act 1973, on aspects of the Annual Accounts, including the judgements
and estimates made.
8.  A draft letter of representation is attached at appendix B. This should be reviewed for
accuracy and any proposed amendments discussed with us. Once satisfied, the letter should be
signed and returned by the Chief Financial Officer with the signed Annual Accounts.
159

Page 160

Concluding remarks
9.  I take this opportunity to record my thanks for the patient and courteous assistance extended
to the audit team. The Chief Financial Officer provided good support to the audit team which
helped to ensure that the audit process ran smoothly. 
Fiona Mitchell-Knight FCA 
Audit Director
Audit Scotland 
4th Floor, The Athenaeum Building 
8 Nelson Mandela Place 
Glasgow, G2 1BT  
160

Page 161

Appendix A:  Proposed Independent Auditor’s Report
Independent auditor’s report to the members of North Ayrshire
Integration Joint Board and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of North Ayrshire
Integration Joint Board for the year ended 31 March 2025 under Part VII of the Local
Government (Scotland) Act 1973. The financial statements comprise the Comprehensive
Income and Expenditure Statement, Movement in Reserves Statement, Balance Sheet, and
notes to the financial statements, including material accounting policy information. The financial
reporting framework that has been applied in their preparation is applicable law and UK adopted
international accounting standards, as interpreted and adapted by the Code of Practice on Local
Authority Accounting in the United Kingdom 2024/25 (the 2024/25 Code).
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the body as at 31
March 2025 and of its income and expenditure for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2024/25 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing
(UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts
Commission for Scotland. My responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed by the Accounts Commission on 3 April 2023. My period of appointment is five years,
covering 2022/23 to 2026/27. I am independent of the body in accordance with the ethical
requirements that are relevant to my audit of the financial statements in the UK including the
Financial Reporting Council’s Ethical Standard, and I have fulfilled my other ethical
responsibilities in accordance with these requirements. Non-audit services prohibited by the
Ethical Standard were not provided to the body. I believe that the audit evidence I have
obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the
financial statements is appropriate.
Based on the work I have performed, I have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the body’s
ability to continue to adopt the going concern basis of accounting for a period of at least twelve
months from when the financial statements are authorised for issue.
161

Page 162

These conclusions are not intended to, nor do they, provide assurance on the body’s current or
future financial sustainability. However, I report on the body’s arrangements for financial
sustainability in a separate Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement
that I identified and my judgements thereon.
Responsibilities of the Chief Financial Officer and North Ayrshire Integration Joint
Board for the financial statements
As explained more fully in the Statement of Responsibilities, the Chief Financial Officer is
responsible for the preparation of financial statements that give a true and fair view in
accordance with the financial reporting framework, and for such internal control as the Chief
Financial Officer determines is necessary to enable the preparation of financial statements that
are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, the Chief Financial Officer is responsible for assessing the
body’s ability to continue as a going concern, disclosing, as applicable, matters related to going
concern and using the going concern basis of accounting unless there is an intention to
discontinue the body’s operations.
The North Ayrshire Integration Joint Board is responsible for overseeing the financial reporting
process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a
whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be expected to
influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• using my understanding of the local government sector to identify that
the Local Government (Scotland) Act 1973, The Local Authority
Accounts (Scotland) Regulations 2014, and the Local Government in
Scotland Act 2003 are significant in the context of the body;
• inquiring of the Chief Financial Officer as to other laws or regulations
that may be expected to have a fundamental effect on the operations of
the body;
• inquiring of the Chief Financial Officer concerning the body’s policies
and procedures regarding compliance with the applicable legal and
regulatory framework;
• discussions among my audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur;
and
162

Page 163

• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the body’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the
Remuneration Report
I have audited the parts of the Remuneration Report described as audited. In my opinion, the
audited parts of the Remuneration Report have been properly prepared in accordance with The
Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Chief Financial Officer is responsible for the other information in the annual accounts. The
other information comprises the Management Commentary, Annual Governance Statement,
Statement of Responsibilities and the unaudited part of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether the other
information is materially inconsistent with the financial statements or my knowledge obtained in
the course of the audit or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If, based on the
work I have performed, I conclude that there is a material misstatement of this other information,
I am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do not
express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
163

Page 164

• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration
Report are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit. 
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best Value,
are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of
the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties. 
Fiona Mitchell-Knight FCA
Audit Director
Audit Scotland
4th Floor, The Athenaeum Building
8 Nelson Mandela Place
Glasgow, G2 1BT 
164

Page 165

Appendix B: Letter of Representation (ISA 580) 
Fiona Mitchell-Knight
Audit Director
Audit Scotland 
4th Floor, North Suite 
The Athenaeum Building 
8 Nelson Mandela Place 
Glasgow 
G2 1BT
Dear Fiona, 
North Ayrshire Integration Joint Board
Annual Accounts 2024/25
1.  This representation letter is provided in connection with your audit of the Annual Accounts of
North Ayrshire Integration Joint Board for the year ended 31 March 2025 for the purpose of
expressing an opinion as to whether the financial statements give a true and fair view in
accordance with the financial reporting framework, and for expressing other opinions on the
Remuneration Report, Management Commentary and Annual Governance Statement.
2.  I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the North Ayrshire Integration Joint Board, North Ayrshire Council and NHS Ayrshire and Arran,
the following representations given to you in connection with your audit of North Ayrshire
Integration Joint Board’s Annual Accounts for the year ended 31 March 2025.
3.  I acknowledge my responsibility and that of North Ayrshire Integration Joint Board for the
Annual Accounts. All the accounting records, documentation and other matters which I am
aware are relevant to the preparation of the annual accounts have been made available to you
for the purposes of your audit, including minutes of all management and other meetings. All
transactions undertaken by North Ayrshire Integration Joint Board have been recorded in the
accounting records and are properly reflected in the financial statements.
Financial reporting framework
4.  The Annual Accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2024/25 (2024/25 accounting code) the
requirements of the Local Government (Scotland) Act 1973, the Local Government in Scotland
Act 2003 and The Local Authority Accounts (Scotland) Regulations 2014.
5.  Disclosure has been made in the financial statements of all matters necessary for them to
show a true and fair view of the transactions and of the North Ayrshire Integration Joint Board
for the year ended 31 March 2025.
Legality of financial transactions
6.  The financial transactions of North Ayrshire Integration Joint Board are in accordance with
the relevant legislation and regulations governing its activities. I am unaware of any actual or
non-compliance with laws and regulations.
Accounting policies and estimates
7.  All material accounting policies adopted are as shown in the Statement of Accounting
Policies included in the financial statements. The appropriateness of these policies has been
reviewed and takes account of the requirements set out in the 2024/25 accounting code.
165

Page 166

8.  The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. There are no changes in estimation techniques
which should be disclosed due to their having a material impact on the accounting disclosures.
Going concern
9.  I have assessed North Ayrshire Integration Joint Board's ability to carry on as a going
concern and concluded that it is appropriate to prepare the financial statements on a going
concern basis.
Carrying value of assets and liabilities
10.  All liabilities and contingent liabilities at 31 March 2025 of which I am aware have been
recognised in the annual accounts. The assets and liabilities have been recognised, measured,
presented, and disclosed in accordance with the 2024/25 accounting code. There are no plans
or intentions that are likely to affect the carrying value or classification of the assets in the
financial statements.
Litigation and Claims
11.  We have made you aware that there are no known actual or possible legal claims 
Fraud
12.  I have provided you with all information in relation to 
• my assessment of the risk that the financial statements may be materially misstated as
a result of fraud 
• any allegations of fraud or suspected fraud affecting the financial statements
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Laws and Regulations
13.  I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements.
Remuneration Report 
14.  The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Amendment Regulations 2014, and all required information of which I am
aware has been provided to you.
Management commentary
15.  I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
16.  I confirm that North Ayrshire Integration Joint Board has undertaken a review of the system
of internal control during 2024/25 to establish the extent to which it complies with proper
practices set out in the Delivering Good Governance in Local Government: Framework 2016. I
have disclosed to you all deficiencies in internal control identified from this review or of which I
am otherwise aware.
166

Page 167

17.  I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
governance arrangements or issues identified, since 31 March 2025, which require to be
reflected. 
Related Party Transactions
18.  All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2024/25 accounting code. I have
made available to you the identity of all the North Ayrshire Integration Joint Board’s related
parties and all the related party relationships and transactions of which I am aware.
Events Subsequent to the Date of the Balance Sheet
19.  I am not aware of there being any events subsequent to 31 March 2025 for which the
2024/25 accounting code requires adjustment or disclosure in the Annual Accounts. 
Yours sincerely 
Eleanor Currie
Chief Finance Officer 
167

Page 168

168

Page 169

North Ayrshire
Integration Joint
Board
2024/25 Annual Audit Report 
Prepared for North Ayrshire Integration Joint Board and the Controller of Audit 
September 2025
Agenda Item 10
169

Page 170

0BNorth Ayrshire Integration Joint Board: 2024/25 Annual Audit Report | 2 
Contents 
Key messages 3
Introduction 5
Audit scope and responsibilities 6
Audit of the annual accounts 8
Wider scope and Best Value audit 12
Appendix 1 28
Appendix 2 30
Appendix 3 33 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.
170

Page 171

Key messages | 3 
Key messages 
Audit of the annual accounts
1 All audit opinions stated that the annual accounts were free from material
misstatement. 
2 There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed by
North Ayrshire Integration Joint Board (NAIJB).
Financial Sustainability 
3 In 2024/25 a budget overspend of £3.593 million was reported, covered by
additional funding contributions from partners.
4 The IJB used £4.730 million of reserves in the year.  At 31 March 2025 the
IJB has £3.161 million of earmarked reserves and no uncommitted reserves.
The IJB Reserves Strategy recommends that the IJB will aspire to hold
between 2 and 4% of its annual budgeted expenditure as an uncommitted
reserve. The lack of any uncommitted reserves therefore represents a
significant financial risk to both the IJB and its partners.
5 The 2025/26 budget included proposed savings of £4.019 million.  The latest
six-month progress update on the IJB’s transformation plan reports a £2.93
million savings and overspend reduction target for 2025/26. 
6 The Medium-Term Financial Outlook has identified required savings of
between £8.1 million and £21.4 million in 2026/27 (best case to worst case
scenarios). The IJB’s cost base is not sustainable; current funding levels and
savings from transformation will not cover the estimated costs.  The IJB
needs to support more radical reform and cost reductions if it is to
demonstrate financial sustainability.
Other Wider scope and Best Value audit 
7 The IJB has a clear strategic vision that is supported by its partners but
financial plans need to align to the vision to show how it can be delivered.  
171

Page 172

Key messages | 4 
8 Performance management arrangements are effective.  Of the 18 national
indicators, 16 (89%) either achieved or were above target for 2024/25. 
However delayed discharges have increased by more than 61% over the
same period.
9 There is evidence of elements of Best Value being demonstrated by the IJB
across a range of areas.  However the mechanism for formally reviewing and
reporting on the arrangements to secure Best Value needs to be formalised
and reported to the board. 
172

Page 173

Introduction | 5 
Introduction 
Purpose of the Annual Audit Report
1.  The purpose of this Annual Audit Report is to report the significant
matters identified from the 2024/25 audit of North Ayrshire Integration
Joint Board annual accounts and the wider scope areas specified in the
Code of Audit Practice (2021).
2.  The Annual Audit Report is addressed to North Ayrshire Integration
Joint Board, hereafter referred to as ‘the IJB’ and the Controller of Audit,
and will be published on Audit Scotland’s website in due course. 
Appointed auditor and independence
3.  Fiona Mitchell Knight, of Audit Scotland, has been appointed as
external auditor of the body for the period from 2022/23 until 2026/27. As
reported in the Annual Audit Plan, Fiona Mitchell Knight as engagement
lead and the audit team are independent of the IJB in accordance with
relevant ethical requirements, including the Financial Reporting Council’s
Ethical Standard. There have been no developments since the issue of the
Annual Audit Plan that impact on the continued independence of the
engagement lead or the rest of the audit team from the IJB, including no
provision of non-audit services. 
Acknowledgements
4.  We would like to thank the Audit and Performance Committee
members, Joint Board members, senior management, and other staff,
particularly those involved in the preparation of the annual accounts, for
their cooperation and assistance during the audit. We look forward to
working together constructively over the remainder of the five-year audit
appointment.
173

Page 174

Audit scope and responsibilities | 6 
Audit scope and responsibilities 
Scope of the audit 
5.  The audit is performed in accordance with the Code of Audit Practice,
including supplementary guidance, International Standards on Auditing
(ISA) (UK), and relevant legislation. These set out the requirements for the
scope of the audit which includes: 
• An audit of the financial statements and an opinion on whether they
give a true and fair view and are free from material misstatement. 
• An opinion on statutory other information published with the financial
statements in the annual accounts, namely the Management Commentary
and Annual Governance Statement.
• An opinion on the audited part of the Remuneration Report. 
• Conclusions on the IJB’s arrangements in relation to the wider scope
areas: Financial Management; Financial Sustainability; Vision, Leadership
and Governance; and Use of Resources to Improve Outcomes. 
• Reporting on the IJB’s arrangements for securing Best Value.
• Provision of this Annual Audit Report.
Responsibilities and reporting
6.  The Code of Audit Practice sets out the respective responsibilities of the
body and the auditor. A summary of the key responsibilities is outlined
below. 
Auditor’s responsibilities
7.  The responsibilities of auditors in the public sector are established in
the Local Government (Scotland) Act 1973. These include providing an
independent opinion on the financial statements and other information
reported within the annual accounts, and concluding on the IJB’s
arrangements in place for the wider scope areas and Best Value.
8.  The matters reported in the Annual Audit Report are only those that
have been identified by the audit team during normal audit work and may
not be all that exist. Communicating these does not absolve the IJB from
its responsibilities outlined below. 
174

Page 175

Audit scope and responsibilities | 7 
9.  The Annual Audit Report includes an agreed action plan at Appendix 1
setting out specific recommendations to address matters identified and
includes details of the responsible officer and dates for implementation.
The body’s responsibilities
10.  The IJB has primary responsibility for ensuring proper financial
stewardship of public funds, compliance with relevant legislation and
establishing effective arrangements for governance, propriety, and
regularity that enables it to successfully deliver its objectives. The features
of proper financial stewardship include: 
• Establishing arrangements to ensure the proper conduct of its affairs. 
• Preparation of annual accounts, comprising financial statements for the
body that gives a true and fair view and other specified information. 
• Establishing arrangements for the prevention and detection of fraud,
error and irregularities, and bribery and corruption. 
• Implementing arrangements to ensure its financial position is soundly
based. 
• Making arrangements to secure Best Value. 
• Establishing an internal audit function.
Communication of fraud or suspected fraud
11.  In line with ISA (UK) 240 (The Auditor’s Responsibilities Relating
to Fraud in an Audit of Financial Statements), in presenting this report to
the Performance and Audit Committee we seek confirmation from those
charged with governance of any instances of actual, suspected or alleged
fraud that should be brought to our attention. Should members have any
such knowledge or concerns relating to the risk of fraud within the IJB, we
invite them to communicate this to the appointed auditor for consideration
prior to the Annual Accounts being certified.
National performance audit reporting
12.  The Auditor General for Scotland and the Accounts Commission
regularly publish performance audit reports. These cover a range of
matters, many of which may be of interest to the Integration Joint Board.
Details of national and performance audit reports published over the last
year can be seen in Appendix 3.
175

Page 176

Audit of the annual accounts | 8 
Audit of the annual accounts 
Main judgements
All audit opinions stated that the annual accounts were free from
material misstatement. 
There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed
by the body.
Audit opinions on the annual accounts 
13.  The IJB’s annual accounts were approved at the meeting of the
Integration Joint Board on 27th June 2025 and certified by the appointed
auditor on 25th September 2025. The Independent Auditor’s Report is
included in the body’s annual accounts, and this reports that, in the
appointed auditor’s opinion, these were free from material misstatement. 
Audit timetable 
14.  The unaudited annual accounts and all working papers were
received by 30 June 2025 in accordance with the agreed audit timetable. 
Audit Fee
15.  The audit fee for the 2024/25 audit was reported in the Annual
Audit Plan and was set at £34 thousand. There have been no
developments that impact on planned audit work required, therefore the
audit fee reported in the Annual Audit Plan remains unchanged. 
Materiality
16.  The concept of materiality is applied by auditors in planning and
performing an audit, and in evaluating the effect of any uncorrected
misstatements on the financial statements or other information reported in
the annual accounts.
17.  Broadly, the concept of materiality is to determine whether
misstatements identified during the audit could reasonably be expected to
influence the decisions of users of the annual accounts. Auditors set a
monetary threshold when determining materiality, although some issues
may be considered material by their nature. Therefore, materiality is
ultimately a matter of the auditor’s professional judgement.
176

Page 177

Audit of the annual accounts | 9 
18.  Materiality levels for the audit of the IJB were determined at the
risk assessment phase of the audit and were reported in the Annual Audit
Plan, which also reported the judgements made in determining materiality
levels. These were reassessed on receipt of the unaudited annual
accounts and updated as can be seen in Exhibit 1.
Exhibit 1
2024/25 Materiality levels for the IJB 
Materiality  IJB
Materiality – set at 2% of gross expenditure  £7.640 million
Performance materiality – set at 70% of materiality.
As outlined in the Annual Audit Plan, this acts as a
trigger point. If the aggregate of misstatements
identified during the audit exceeds performance
materiality, this could indicate further audit procedures
are required. 
£5.350 million
Reporting threshold – set at 5% of materiality.   £0.380 million
Source: Audit Scotland
Significant findings and key audit matters 
19.  ISA (UK) 260 requires auditors to communicate significant findings
from the audit to those charged with governance, which for the body is the
Integration Joint Board.
20.  The Code of Audit Practice also requires public sector auditors to
communicate key audit matters. These are the matters that, in the
auditor’s professional judgement, are of most significance to the audit of
the financial statements and require most attention when performing
the audit. 
21.  In determining key audit matters, auditors consider:
• Areas of higher or significant risk of material misstatement. 
• Areas where significant judgement is required, including accounting
estimates that are subject to a high degree of estimation uncertainty. 
• Significant events or transactions that occurred during the year.
22.  There are no significant findings or key audit matters to report.
177

Page 178

Audit of the annual accounts | 10 
Qualitative aspects of accounting practices 
23.  ISA (UK) 260 also requires auditors to communicate their view
about qualitative aspects of the body’s accounting practices, including
accounting policies, accounting estimates, and disclosures in the financial
statements.
Accounting policies 
24.  The appropriateness of accounting policies adopted by the body
was assessed as part of the audit. These were considered to be
appropriate to the circumstances of the body, and there were no
significant departures from the accounting policies set out in the Code of
Practice on Local Authority Accounting in the United Kingdom (the Code). 
Accounting estimates 
25.  Accounting estimates are used in number of areas in the body’s
financial statements.  Audit work considered the process management of
the body has in place around making accounting estimates, including the
assumptions and data used in making the estimates, and the use of any
management experts. Audit work concluded:  
• There were no issues with the selection or application of methods,
assumptions, and data used to make the accounting estimates, and these
were considered to be reasonable. 
• There was no evidence of management bias in making the accounting
estimates.
Disclosures in the financial statements
26.  The adequacy of disclosures in the financial statements was
assessed as part of the audit. The quality of disclosures was adequate,
with additional levels of detail provided for disclosures around areas of
greater sensitivity.
Significant matters discussed with management
27.  All significant matters identified during the audit and discussed
with the body’s management have been reported in the Annual Audit
Report.
Audit adjustments
28.  No audit adjustments were required to the financial statements
greater than the reporting threshold of £0.380 million.
Significant risks of material misstatement identified in the
Annual Audit Plan
29.  Audit work has been performed in response to the significant risks
of material misstatement identified in the Annual Audit Plan. The outcome
of audit work performed is summarised in Exhibit 2.
178

Page 179

Audit of the annual accounts | 11 
Exhibit 2 
Significant risks of material misstatement to the financial statements 
Risk of material
misstatement Planned audit response Outcome of audit work
Fraud caused by
management override of
controls 
Management is in a unique
position to perpetrate fraud
because of management’s
ability to override controls
that otherwise appear to be
operating effectively.
The audit team will:
• Assurances will be
obtained from the auditors
of NHS Ayrshire and Arran
and North Ayrshire Council
over the completeness,
accuracy and allocation of
income and expenditure. 
• Evaluate any significant
unusual transactions
outside the normal course
of business. 
Audit work performed found:
• We obtained assurances
from the auditors of NHS
Ayrshire and Arran and
North Ayrshire Council
over the completeness,
accuracy and allocation of
income and expenditure.
• No significant unusual
transactions outside the
normal course of business.
Conclusion: no evidence of
fraud caused by
management override of
controls. 
Source: Audit Scotland 
179

Page 180

Wider scope and Best Value audit | 12 
Wider scope and Best Value
audit 
Conclusion
The 2024/25 year end budget overspend of £3.593 million was met by
additional funding contributions from partners.  
The IJB utilised £4.730 million of reserves in year.  At 31 March 2025
the IJB has £3.161 million of earmarked reserves and no uncommitted
reserves. This represents a significant financial risk to both the IJB and
its partners.
The 2025/26 budget included proposed savings of £4.019 million. The
latest six-month progress update on the IJB’s transformation plan
reports a £2.93 million savings and overspend reduction target for
2025/26.
The Medium-Term Financial Outlook has identified required savings of
between £8.1 million and £21.4 million in 2026/27 (best to worst case
scenarios). The IJB’s cost base is not sustainable; current funding levels
and savings from transformation will not cover the estimated costs.  The
IJB needs to support more radical reform and cost reductions if it is to
demonstrate financial sustainability.
The IJB has a clear strategic vision that is supported by its partners but
financial plans need to be aligned to the vision to show how it can be
delivered.  
Performance management arrangements are effective.  Of the 18
national indicators, 16 (89%) either achieved or were above target for
2024/25.  However delayed discharges have increased by more than
61% over the same period. 
Whilst there is evidence of elements of Best Value being demonstrated
by the IJB across a range of areas, the mechanism for formally
reviewing and reporting on the arrangements to secure Best Value
needs to be formalised and reported to the board. 
180

Page 181

Wider scope and Best Value audit | 13 
Audit approach to wider scope and Best Value
Wider scope
30.  As reported in the Annual Audit Plan, the wider scope audit areas
are: 
• Financial Management.
• Financial Sustainability.
• Vision, Leadership and Governance.
• Use of Resources to Improve Outcomes. 
31.  Audit work is performed on these four areas and a conclusion on
the effectiveness and appropriateness of arrangements the body has in
place for each of these is reported in this chapter. 
Best Value 
32.  The duty on auditors to consider the arrangements in place to
secure Best Value applies to the body as it falls within section 106 of the
Local Government (Scotland) Act 1973.
33.  Consideration of the arrangements the body has in place to secure
Best Value has been carried out alongside the wider scope audit. 
Significant wider scope and Best Value risks 
34.  Audit work has been performed in response to the significant wider
scope and Best Value risks identified in the Annual Audit Plan. The
outcome of audit work performed is summarised in Exhibit 3.
181

Page 182

Wider scope and Best Value audit | 14 
Exhibit 3
Significant wider scope and Best Value risks
Significant risk Planned audit response Outcome of audit work
Financial planning and
sustainability 
At month 7 against the full-
year budget of £324.231m
there is a projected year-end
overspend of £6.190m
(1.9%), reduced to £3.613m
through identified financial
recovery actions.  This overall
position consists of a
projected residual overspend
of £2.548m in social care
services and a projected
overspend of £1.065m in
health services. The IJB has
approached NAC and
NHSAA for additional
funding.  
Current budget scenarios for
2025/26 are a £0.6m
underspend (best-case),
£3.7m overspend (medium-
case) and a £11.8m
overspend (worst-
case).  Additional budget
savings will require to be
identified to achieve a
balanced budget position for
approval by the IJB in
March.  
The audit team will: 
• Monitor progress in
achieving the 2024/25
revenue budget,
2024/25 financial
recovery actions and
cost avoidance plans.  
• Review of financial
performance reports
presented to the
Board. 
• Review the medium-
term financial plan and
assessment of plans to
address any
forecasted budget
deficits. 
• Evaluate the IJB’s
progress with the
development of its
Transformation Plan
and assess how this is
contributing to the
achievement of
financial balance.
Audit work identified that:
• The 2024/25 budget was
overspent by £3.593
million which was funded
by contributions from
partners. 
• Medium term financial
forecasts show significant
funding gaps in 2026/27
and 2027/28.
• There are no approved
plans to meet the budget
gaps set out in the Medium
Term Financial Outlook.
This needs to be
addressed as a matter of
urgency.
Conclusion: There is a
risk that the IJB is unable
to deliver the
transformational change or
cost reductions at the pace
required.
Source: Audit Scotland
Prior year recommendations 
35.  The IJB has made some progress towards implementing the
agreed prior year recommendations relating to the wider scope audit.
Progress against these is outlined in Appendix 2 of this report.  Two
remain ongoing and will be followed up again as part of the 2025/26 audit.
182

Page 183

Wider scope and Best Value audit | 15 
Conclusions on wider scope audit
Financial Management 
A balanced budget was set for 2024/25 this included
£10.290 million of savings proposals with no draw on
reserves 
36.  The IJB set a balanced budget for 2024/25 on 14 March 2024.
This did not require any draw on reserves but did include the approval of
£10.290 million of savings to achieve financial balance.  Required savings
were split £9.255 million social care and £1.035 million health services.
37.  £7.238 million of the social care savings arose from the non-
recurring reduction in employer superannuation contribution rates from 1
April 2024.  A further £0.375 million was a reduction in the number of
funded care home places by 15, leaving budgetary provision for 765
places at average cost.  The largest element of health savings was £0.5
million from a reduction in Hospital Based Complex Continuing Care
provision.
The 2024/25 year end budget overspend of £3.593 million
was met by additional funding contributions from
partners
38.  The year end budget was overspent by £1.212 million, prior to
transfer of unspent funding allocations of £2.381 million to earmarked
reserves.  This resulted in an overall overspend of £3.593 million. The
Integration Scheme provides for funds to be made available (by the
partners) for overspends against the operational budget.  However the
partners also agreed to make funds available for the carry forward of
unspent Scottish Government funding allocations including Whole Family
Wellbeing (£0.9 million), Alcohol and Drug Partnership (£0.4 million),
Mental Health Recovery and Renewal (£0.4 million) and Primary Care
Improvement Fund (£0.3 million).  
39.  North Ayrshire Council considered this at their Cabinet meeting of
3 June 2025 and agreed to a non-recurring funding increase of £2.036
million and no requirement to repay the funds in future years.  Similarly,
NHSAA funded the health services overspend of £1.557 million.
40.  The Chief Officer reported to the IJB meeting of 19 June 2025 that
the required savings of £10.290 million had been achieved in full.
41.  Significant variations from budget included Care at Home which
was £2.712 million overspent reflecting the cost of meeting the increased
demand and level of provision for care at home support.  In addition, Care
183

Page 184

Wider scope and Best Value audit | 16 
Experienced Children and Young People was overspent by £1.903 million,
mainly due to increased demand for children’s residential placements.
The IJB utilised £4.730 million of reserves in year.  At 31
March 2025 the IJB has £3.161 million of earmarked
reserves and no uncommitted reserves. This represents a
significant financial risk to both the IJB and its partners
42.  One of the key measures of the financial health of a body is the
level of reserves held. The IJB general fund reserve can be earmarked
balances for future commitments or uncommitted balances. The IJB’s
reserve strategy was approved by the Board in March 2024. The strategy
outlines a target contingency level of 2 - 4% of annual budgeted
expenditure.
43.   At 31 March 2025, the IJB had no uncommitted reserve balances
against the target level for the year of £6.715 - £13.430 million.  The
absence of any uncommitted general fund reserves seriously limits the
IJB’s ability to manage and mitigate future financial pressures and
represents a significant financial risk to both the IJB and its partners.
44.  In 2023/24 we recommended that the IJB must urgently map a
clear route to bring uncommitted reserves back up to the minimum
level. The IJB accepts and acknowledges that uncommitted reserves
require to be restored to the minimum recommended level.  However the
Annual Accounts also report that in the short-term, service pressures
mean that this will not be achievable.
45.  Total earmarked reserves of £3.161 million include the unspent
funding allocations of £2.381 million noted at paragraph 38 above together
with the balance of £0.780 million on the Service Redesign/Challenge
Fund.
46.  Whilst concerns are highlighted in relation to the uncommitted
reserves and a requirement to reinstate these as a tool for effective
financial management and sustainability, it is acknowledged that the
balance of reserves will be considered as part of the IJB annual budget
setting process. Whilst the ambition would be to plan to replenish the
contingency reserves for the IJB in future years, in setting the budget for
2025/26 the IJB were advised that the reality is in the current financial
operating environment there is not the ability or scope to plan for this in
the short term.  This is acknowledged as a challenge for all IJBs, with
reports that at the end of 2024/25 over half of IJBs across Scotland hold
no contingency reserve and only one area is expected to have reserves
over 2% moving into 2025/26. 
184

Page 185

Wider scope and Best Value audit | 17 
Financial systems of internal control operated effectively 
47.  The IJB is reliant on the systems of its partner bodies. NHS
Ayrshire and Arran and North Ayrshire Council, for its key financial
systems, including ledger and payroll. All IJB transactions are processed
through respective partners’ systems and all controls over those systems
are within the partner bodies rather than the IJB.
48.  As part of our audit approach, we sought assurances from the
external auditors of NHS Ayrshire and Arran and North Ayrshire Council
(in accordance with ISA 402) and confirmed there were no weaknesses in
the systems of internal control for either the health board or council.
High absence rates were reported in areas which require
cover arrangements, principally care at home.  In 2024/25
this resulted in additional costs of £1.05 million
49.  Overtime costs of £1.05 million were incurred by the HSCP to
provide absence cover requirements.   For Care at Home (£0.85 million)
the HSCP budgets for a full establishment but overtime is funded through
vacant posts or ‘20 hour’ posts. Cover requires to be provided as service
users cannot be left without a life and limb service. The remaining £0.2
million relates to the children’s houses which also require that any
absences are covered, and financial inclusion which relates to overtime
worked as part of the financial reassessment process.
50.  A performance report for Quarter 1 2025/26 submitted to the
Performance and Audit Committee in September 2025 outlined that
wellbeing action plans around sickness absence levels within the Care at
Home workforce were being robustly managed and supporting staff to
maintain attendance/return to work. Despite these efforts the service saw
an increase in front line staff absences by a further 1% from Quarter 4
2024 to 2025 to Quarter 1 2025 to 2026, with sickness absence now over
14%. The service has also experienced significant challenges in sickness
absence and vacancies within non-frontline service delivery roles.
Standards of conduct and arrangements for the
prevention and detection of fraud and error were
appropriate 
51.  The IJB does not maintain its own policies relating to the
prevention and detection of fraud and error but instead depends on those
in place at its partner bodies. We reviewed the arrangements in place at
NHS Ayrshire and Arran and North Ayrshire Council through consideration
of the work by partner body auditors and found them to be adequate. 
185

Page 186

Wider scope and Best Value audit | 18 
52.  Appropriate arrangements are in place for the prevention and
detection of fraud and error. We are not aware of any specific issues we
require to bring to your attention.
Financial Sustainability 
The IJB cannot demonstrate the financial sustainability of
its services
53.  Financial sustainability looks forward to the medium and longer
term to consider whether the body is planning effectively to continue to
deliver its services or the way in which they should be delivered. 
54.  As outlined at Exhibit 3, a significant wider scope risk was
identified around financial sustainability. We have noted below significant
challenges going forward in the IJB’s ability to achieve financial balance. 
55.  The IJB approved its medium term financial plan 2025-2028 in
December 2024.   An update to the original projected funding gap was
presented to the IJB in March 2025 as part of the annual budget for
2025/26.
The 2025/26 budget includes proposed savings of £4.019
million
56.  As set out in Exhibit 4, the 2025/26 budget has a funding gap of
£3.069 million and the IJB approved savings of £4.019 million.  This level
of savings was proposed to create a surplus of £0.950m as a contingency
towards any 2024/25 overspends which would continue into 2025/26.  The
IJB was updated on the projected implications of overspends in 2024/25
moving into the new financial year and additional savings were approved
to support the management of these overspends during 2025/26 rather
than any surplus being planned to for example reinstate reserves.
186

Page 187

Wider scope and Best Value audit | 19 
Exhibit 4
North Ayrshire IJB 2025/26 Budget Gap and Savings 
Source: North Ayrshire IJB
57.  The £4.019 million savings are rated £2.984 million Amber and
£1.035m Green.  Amber rated savings include: Improve outcomes for care
experienced young people (£1.0 million);  Continued review of Care at
Home service (£0.5 million); and review of Financial Inclusion Service
(£0.36 million).  
58.  There is considerable uncertainty around a significant proportion
of these savings.  For example, improving outcomes for care experienced
young people will require significant understanding of both the costs
associated with the current system and to identify what needs to change,
and further reduction in the care at home service has the potential to
create cost pressures in other parts of the system. Care Experienced
Children and Young People is projected at Month 3 to overspend by
£2.857 million in 2025/26.  Care at Home is projected at Month 3 to be
£1.641 million overspent in 2025/26. In addition and as noted at para 41
above, both of these areas were significantly overspent in 2024/25.  The
Chief Officer has confirmed that issues are being addressed by various
initiatives, monitoring and review.  
The Medium-Term Financial Outlook has identified
required savings of between £13.6 million and £21.4
million in 2026/27
59.  A Medium-Term Financial Outlook (MTFO) has been prepared to
identify what the financial position may look like moving into 2026/27 and
2027/28.  The MTFO notes that for 2025/26, the outturn was between the
projected medium and the worst case scenarios for that year and it would
be prudent to assume a similar position for2026/27 and 2027/28.  As set
187

Page 188

Wider scope and Best Value audit | 20 
out at Exhibit 5, the modelling which has been carried out has identified
required savings of between £13.6 million and £21.4 million for 2026/27
and between £5.7 million and £14.7 million for 2027/28.
60.  The significant shortfall in 2026/27 is linked to the expected
increase in local government employer pension contributions from 6.5% in
2025/26 to 17.5% in 2026/27.
Exhibit 5 
North Ayrshire MTFO 2026/27 – 2027/28 
Source: North Ayrshire IJB
The MTFO indicates the IJB’s cost base is not
sustainable; current funding levels and savings from
transformation will not cover the estimated costs.  The
IJB needs to support more radical reform and reduce the
cost base if it is to demonstrate financial sustainability
61.  The Accounts Commission’s July 2024 report on Integration Joint
Boards: Finance and Performance 2024 emphasised the need for a more
significant transformation of services to achieve financial sustainability.
This is becoming increasingly important as recurring savings get more
difficult to identify and achieve.   
62.  The overall picture, set out by the Accounts Commission is
concerning. It shows a continued picture of overspending, depletion of
reserves and reliance on one-off rather than recurring savings. There is a
need for transformational changes in the way services are being delivered
and for the identification and delivery of significant recurring savings. IJBs
in Scotland also need to be working collaboratively with each other and
with their NHS and council partners to find ways to transform services on a
longer-term basis so that they are affordable.
63.  In 2023/24 we reported that the IJB has recognised that the
challenging financial environment it is operating in will likely continue for
some years to come and agreed an updated Transformation Plan 2024-27
in March 2024. We also reported that the Service Redesign and Change
188

Page 189

Wider scope and Best Value audit | 21 
Fund aims to support the Transformation Plan through the redesign of
services and investments in new technologies. The balance on the Fund
at 31 March 2025 was £0.780 million. These funds are allocated on a non-
recurring basis.  
64.  An Internal Audit review of IJB transformation submitted to the
September 2025 Performance and Audit Committee gave an opinion of
substantial assurance in relation to the governance of the Transformation
Plan.  
65.  Not all projects in the Transformation Plan have a direct financial
impact although a number will deliver financial savings.  Of the 75 projects
approved in March 2024, 40 were reported as having a financial impact. 
Some financial targets were identified as part of the budget development
for 2025/26.  Identified savings and overspend reductions are tracked in
the online trackers.
66.    The latest six-month progress update was provided to the IJB in
August 2025.   The report provided updates on specific projects across all
service areas and notes a £2.93 million savings and overspend reduction
target for 2025/26. 
67.  The Transformation Plan is critical to the ongoing sustainability of
service delivery.  In 2023/24 we reported that that the refreshed
Transformation Plan includes timescales and is being overseen by the
IJB’s Transformation Board.  However based on current projections,
savings from transformation fall significantly short of the potential budget
gaps in 2026/27 and 2027/28.  Financial recovery from this position will
require radical reform of services.  Whilst the transformation programme
needs to be sufficiently ambitious to respond to the scale of the financial
challenges, the Chief Officer is clear that future recurring savings also
need to be made through workforce changes, service review and charging
reviews. In the absence of any contingency reserve of its own, the
increased demand for health and social care services alongside rising
costs presents a significant financial risk to both the IJB and its partners.
68.  Recurring pressures are currently being met with a combination of
recurring and non-recurring solutions with an underlying recurring over-
commitment. This needs to be addressed as a matter of urgency. An
effective medium term financial recovery plan needs to be introduced, and
decisions made about the way services are delivered in the short, medium
and longer-term based on information about the cost, impact and quality of
all available options. Detailed scenario planning should also be
undertaken to provide an understanding for the IJB of the effects of
various reform options.
69.  In 2023/24 we reported that in order to facilitate greater scrutiny of
the financial position and the delivery of the financial recovery plan during
2024/25.  The IJB agreed at its June 2024 meeting to establish a ‘Finance
Working Group’, chaired by the IJB Vice Chair. The Director and Heads of
189

Page 190

Wider scope and Best Value audit | 22 
Service are members of the group. This Group will continue to meet
monthly during 2025/26 to facilitate increased oversight and scrutiny of the
financial position and transformation programme as well as detailed
budget planning for future financial years.
70.  Change and cost base reduction now needs to happen quickly if
the IJB is to address its transformational challenges. More focused and
effective leadership is needed to drive the change and to promote a
culture of challenge. Joint Board members should challenge the progress
being made.
Recommendation 1:  The Chief Officer, Joint Board members and the
Finance Working Group need to produce a financial plan that
demonstrates how efficiencies from service reform, cost base reduction
and transformation will meet the budget gaps outlined in the MTFO. 
Progress should be reviewed and challenged by the board.  
71.  There are an additional number of risks and challenges faced by
the IJB from the anticipated budget pressures.
72.   We have previously reported that IJBs, with the support of council
and NHS board partner bodies, should be clear about how and when they
intend to achieve their priorities and outcomes, in line with their available
resources; and ultimately how they intend to progress to sustainable,
preventative and community-based services. 
73.  The IJB needs to operate within its delegated budgets however
there are a number of risks and challenges faced by the IJB from the
anticipated budget pressures. For example: 
• The IJB is stopping or reducing services to deliver from within
reduced financial allocations. Whilst the IJB is not in a positive
financial position, further reductions of service in the community has
the potential to create cost pressures in other parts of the system 
•  NHS Ayrshire and Arran continue to meet the increased costs of
energy, e-health and all drugs (including primary care prescribing) in
line with the approved integration scheme (see paragraph 74 below). 
The IJB holds the budget for mental health services and addictions
prescribing
• In relation to the set aside budget, the monitoring of large hospital
activity is complex and requires significant work to be undertaken to
monitor budgets and changes in activity levels (see paragraph 75
below)
• The Integration Scheme for North Ayrshire IJB was last updated in
2018.  There is a legal duty on councils and health boards to review
the Integration Schemes at least every 5 years to consider whether
190

Page 191

Wider scope and Best Value audit | 23 
any changes are necessary or desirable.  The Integration Scheme is
being reviewed on a Pan Ayrshire basis and will be taken to
respective governance boards in 2026.
Work to rebalance the financial risk between the
Integration Joint Boards and the Health Board in some
areas remains ongoing
74.  NHS Ayrshire and Arran currently meet the increased costs of
energy, e-health and all drugs (including primary care prescribing).  The
IJB holds the budget for mental health services and addictions prescribing.
The integration scheme sets out the position in relation to primary care
prescribing, however the scheme also requires that in relation to the set
aside budget, the IJBs should contribute financially if they are responsible
for increased use and risk sharing in these areas.
75.  In 2023/24 we reported that Ayrshire Finance Leads have now
developed and agreed on a new model for costing the set aside
arrangements, based on actual bed usage and average costs which was
expected to be enacted operationally during 2024/25.  However NHS
Ayrshire and Arran has also requested the development of a joint strategic
commissioning plan to enable the setting of directions for Unscheduled
Care, aligned with the Set Aside resources, which has not yet been
approved by the three IJBs. 
76.  We previously reported that during 2023/24, a Task Group relating
to Primary Care Prescribing and led by the Health Board’s Director of
Finance, agreed in principle that whilst IJBs should hold full responsibility
for Primary Care Prescribing, a prudent approach would be to undertake a
period of learning to enable chief officers and funding partners to fully
understand the implications of such a decision.  We are now advised that
the transfer of responsibility of primary care prescribing would require all
parties to the integration schemes to agree to this change (council and
health board) and for due diligence to establish if the service is
appropriately funded.  
Vision, Leadership and Governance 
Governance arrangements are appropriate and operate
effectively 
77.  The audit work performed on the arrangements the IJB has in
place around its Vision, Leadership and Governance found that these
were effective and appropriate. 
78.  There continues to be an increasing focus on demonstrating the
best use of public money. Openness and transparency in how a body
191

Page 192

Wider scope and Best Value audit | 24 
operates and makes decisions is key to supporting understanding and
scrutiny. Transparency means that the public has access to
understandable, relevant, and timely information about how the body is
taking decisions and using resources. 
79.  For 2024/25 the IJB held its meetings in person. The meeting
papers and minutes are available on the IJB’s website.  All Performance
and Audit Committee meetings continued to be held remotely.    
80.  We consider that governance arrangements are appropriate and
generally support effective scrutiny, challenge and decision-making.   The
IJB has a clear strategic vision that is supported by its partners 
81.  The Public Bodies (Joint Working) (Scotland) Act 2014 requires
the IJB to prepare a strategic plan that sets out the arrangements in place
to carry out the integration functions over the period of the plan. The Act
also requires that the plan set out how those arrangements are intended to
achieve, or contribute to achieving, the national health and wellbeing
outcomes. 
82.  To support the IJB in achieving these responsibilities, it has
established a clear strategic vision as set out in its “Caring Together
“Strategic Plan 2022-2030. The plan contains five strategic
objectives/priorities:  
• Enable communities 
• Develop and support workforce 
• Provide early and effective support 
• Improve mental and physical health and wellbeing 
• Tackle inequalities 
83.  The IJB provides services as set out in its Integration Scheme.
The Strategic Plan objectives aim to give direction to the services provided
and commissioned by the IJB and are based on its engagement with its
partners and other key stakeholders together with consideration of
national outcomes.  The current Strategic Plan has no links to financial
plans.
84.  In 2022/23 we reported that the IJB was to refresh the Strategic
Plan in 2024 to ensure it is relevant and up to date. That review is now
underway and includes the development of a new action plan together
with a refresh of the main document to bring this in line with the current
landscape. It is proposed to present the updated document to the IJB in
December 2025. 
192

Page 193

Wider scope and Best Value audit | 25 
A review of the Integration Scheme is ongoing and is due
to conclude  in 2026 
85.  The Public Bodies (Joint Working) (Scotland) 2014, places a legal
duty on Councils and Health Boards to review the Integration Schemes at
least once every five years to consider whether any changes are
necessary or desirable. 
86.  As set out at para 71 above, the Integration Scheme for the IJB
was last reviewed in 2018. The current review of the Integration Scheme
has been undertaken on a pan-Ayrshire basis by the three Councils and
the Health Board to ensure a consistent and co-ordinated approach. A
project Board was established to oversee the work and various work
groups were established. The review of the Integration Scheme through
the various workgroups concluded in March 2024. Further work has since
been undertaken to consider specific issues and the overall legal
competence of the Scheme.
87.  It is anticipated that the Integration Scheme review will conclude in
2026. Following this, it will require approval by North Ayrshire Council and
NHS Ayrshire and Arran, prior to submission to the Scottish Ministers.
Use of Resources to Improve Outcomes 
Performance management arrangements are effective.  Of
the 18 national indicators, 16 (89%) either achieved or
were above target for 2024/25.  However delayed
discharges have increased by more than 61% over the
same period 
88.  The Performance and Audit Committee has a role in providing
oversight of performance reporting against the strategic plan. Twelve
month rolling performance reports are presented to most meetings of the
committee. This provides assurance to the Performance and Audit
Committee of overall performance.
89.  There are local indicators used for performance reporting by the
IJB, however for comparability when assessing the performance of the
IJB, we have considered several key Ministerial Strategic Group for Health
and Community Care (MSGHCC) measures that are used to track
performance in Integration Authorities. 
90.  Of the 16 local indicators used, 14 out of 16 (87.5%) either
achieved or were above target.  Exhibit 6 sets out the IJB’s results against
a number of the MSG measures for 2024/25 .  Of the 18 indicators, 16
(89%) either achieved or were above target.  However delayed discharges
193

Page 194

Wider scope and Best Value audit | 26 
bed days  increased from 1,785 during March 2024 to 2,876 during March
2025, an increase of 61.1%.
91.  Delays in accessing Care at Home supports are largely due to
overall capacity to deliver services. As part of the IJB’s financial recovery
plan for 2024/25, which has continued into 2025/26, a recruitment freeze
was implemented to reduce the overspend.  This has resulted in a
reduction in the overall workforce and an overall reduction in service
capacity.  The service has developed a Winter Preparedness and Delayed
Discharge Improvement Plan with a key focus on supporting Care at
Home Capacity.  However with a reduction in service capacity, an
increased focus on early discharge from hospital and a sickness absence
rate of over 14% in the Care at Home workforce, improvement in this area
is unlikely without radical reform.  Current initiatives include
implementation of a call monitoring system, a review of roles, prioritisation
of access including reviews of eligibility criteria.
Exhibit 6
National performance measures (age 18+)  
Measures   24/25 performance   Improving from 23/24 
Emergency admissions to
acute hospitals  9.1% decrease  Yes 
Unscheduled “hospital bed
days” in acute hospital  40.8% decrease  Yes 
Unscheduled “hospital bed
days” in geriatric long stay 68.3% decrease Yes
Emergency department
attendances 0.5% increase No
Delayed transfers of care bed
days (all)  61.1% increase   No  
Source: North Ayrshire IJB - Annual Performance Report 2024-25 
92.  Whilst there is a need for caution when drawing conclusion from
national comparisons, the Accounts Commission’s Integration Joint
Boards: Finance and Performance 2024 report makes it clear that IJB’s
need to make best use of available data. This needs to include effective
data sharing between partners and key stakeholders. To that end, it is
important that members and management of North Ayrshire IJB satisfy
themselves that the performance results of it are fully assessed on a
continual basis and that these results are used to effectively inform how to
improve outcomes for people who use its services.
93.  We conclude that the IJB has established appropriate
arrangements for reporting performance against national outcomes
through the Annual Performance report. 
194

Page 195

Wider scope and Best Value audit | 27 
A formal review should be undertaken to demonstrate
how the IJB is achieving Best Value 
94.      The Code of Audit Practice requires us to consider the
adequacy of the arrangements in place to demonstrate how the IJB meets
its Best Value duty to secure continuous improvement in the performance
of its functions.  We expect bodies to demonstrate that they meet the
expectations in the Scottish Government, Local Government in Scotland
Act 2003 Best Value: Revised Statutory Guidance 2020.  
95.  Our work on the four wider scope audit areas financial
management, financial sustainability, vision, leadership and governance
and the use of resources to improve outcomes provides evidence of how
the IJB performs in some important areas of Best Value.  Whilst there is
evidence of elements of Best Value being demonstrated by the IJB across
a range of areas, the mechanism for formally reviewing and reporting on
the arrangements to secure Best Value is not formalised and reported to
the Board.    
Recommendation 2:  A Best Value assurance framework should be
formalised, to set out how annual assurances from the IJB’s partners
can be used to provide assurance on Best Value arrangements to the
Board.
195

Page 196

Appendix 1 | 28 
Appendix 1
Action plan 2024/25
2024/25 recommendations
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing   
1. Financial sustainability
There are no approved plans to meet
the budget gaps set out in the MTFO.
This needs to be addressed as a
matter of urgency. 
An effective long term financial
recovery plan needs to be introduced,
and decisions about the way services
are delivered in the short, medium
and longer-term based on information
about the cost, impact and quality of
all available options. Detailed scenario
planning should also be undertaken to
provide an understanding for the IJB
of the effects of various reform
options.
Risk: There is a risk that the IJB is
unable to deliver the transformational
change at the pace that is required.
The Chief Officer,
Joint Board
members and the
Finance Working
Group need to
produce a financial
plan that
demonstrates how
efficiencies from
service reform , cost
base reductions and
transformation will
meet the budget
gaps outlined in the
MTFO.  Progress
should be reviewed
and challenged by
the board. 
(paragraph 70)
Accepted 
Preparation for the 2026/27
budget has commenced. The
Transformation Plan is being
further developed with a
focus on aligning financial
impact to areas of service
change.  A series of meetings
is being held with every
senior manager to review
their services and look at
ways of reducing spend
through either redesign or
cessation of services.  Once
completed the actions
identified will be discussed at
the Finance Working Group
prior to proposals being
presented to the IJB for
approval.  Proposals will be
submitted throughout
2025/26 e.g Brighter
Pathways will be presented in
November 2025.  Final
proposals to bridge any
remaining gap will be
presented in March 2026 as
part of the 2026/27 budget
paper. This work will also
include savings beyond
2026/27.
Chief Officer and Chief
Finance Officer
March 2026
196

Page 197

Appendix 1 | 29 
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing
2. Arrangements to secure Best
Value
Whilst there is evidence of elements
of Best Value being demonstrated by
the IJB across a range of areas, the
mechanism for formally reviewing and
reporting on the arrangements to
secure Best Value is not formalised
and reported to the Board.
Risk: The is a risk that the IJB is not
meeting its Best Value duty to secure
continuous improvement in the
performance of its functions.
A formal review of
the Best Value
assurance
framework and an
assessment of the
partnership’s Best
Value arrangements
should be completed
and reported to the
Joint Board.
(paragraph 95)
Accepted 
A Best Value framework will
be developed and presented
to the IJB, thereafter this will
be incorporated into the
Annual Performance Report
as the mechanism for regular
reporting to the IJB. 
Chief Officer
February 2026 
197

Page 198

Appendix 2 | 30 
Appendix 2
Follow-up of prior year recommendations in the 2023/24 Annual
Audit Report
Issue/Risk Recommendation
Agreed management
action/timing 
PY1. Financial management   
Financial monitoring report
projections during the year varied
significantly from actual outturn.
Financial projections
should be based on clear
evidence and realistic
assumptions.
Complete
The projection for Care at
Home costs in 2023/24 was
understated due to an error in
the forecasting template. This
was explained to the IJB at
the June meeting and was
rectified for 2024/25.
PY2.  Unidentified savings 
At the end of Month 4 (July
2024), the IJB reported a
projected year-end overspend of
£6.697m. Identified financial
improvement actions amount to
£3.702m, A further £2.995m of
financial recovery improvement
actions still require to be
identified.  
The IJB should ensure
that savings plans are
developed as a matter of
urgency, identifying how
the required £2.995
million of financial
recovery improvement
actions in 2024/25 will be
achieved.
Ongoing 
The IJB set a balanced
budget for 2024/25 on 14
March 2024. This did not
require any draw on reserves
but did include the approval
of £10.290 million of savings
to achieve financial balance.   
The 2005/26 budget has a
funding gap of £3.069 million
and proposed savings of
£4.019 million.  
198

Page 199

Appendix 2 | 31 
Issue/Risk Recommendation
Agreed management
action/timing 
PY 3. Uncommitted reserves   
The IJB Reserves Strategy
recommends that the IJB will
aspire to hold between 2 and 4%
of its annual budgeted
expenditure as an uncommitted
reserve. The uncommitted
reserve balance at 31 March
2024 was £0.357 million
(representing only 0.1% of the
IJB’S 2024/25 budget)  and
therefore does not meet the lower
target.  In addition, uncommitted
reserves are forecast to be
depleted by 31 March 2025. 
The IJB must urgently 
map a clear route to bring
uncommitted reserves
back up to the minimum
level. 
Ongoing. 
At 31 March 2025, the IJB
had zero uncommitted
reserves balance against the
target level for the year of
£6.715 - £13.430 million. 
The absence of any
uncommitted general fund
reserves seriously limits the
IJB’s ability to manage and
mitigate future financial
pressures and represents a
significant financial risk to
both the IJB and its partners. 
The IJB accepts and
acknowledge that
uncommitted reserves require
to be restored to the
minimum recommended
level.  However it also reports
in the Annual Accounts that
in the short-term, service
pressures mean that this will 
not be achievable. This will
require to be considered as
part of the annual budget
setting process alongside the
funding allocations from both
partner bodies.   
199

Page 200

Appendix 2 | 32 
Issue/Risk Recommendation
Agreed management
action/timing 
PY B/F 1.  Transformation Plan
(2022/23 recommendation) 
The IJB needs to be clearer
about how the ongoing
improvement activity makes a
difference to the outcomes the
IJB and its partners want to
achieve. 
The IJB and its partners
need to clearly set out
what achieving its
intended outcomes looks
like in the short, medium
and longer term.
Superseded 
Based on current projections,
projected savings from
transformation are not
enough to close the potential
budget gaps in 2026/27 and
2027/28.  Financial recovery
from this position will require
radical reform of services and
service/cost reductions.  In
the absence of any
contingency reserve of its
own, this presents a
significant financial risk to
both the IJB and its partners. 
An effective long term
financial recovery plan needs
to be introduced, and
decisions about the way
services are delivered in the
short, medium and longer-
term based on information
about the cost, impact and
quality of all available
options. Detailed scenario
planning should also be
undertaken to provide an
understanding for the IJB of
the effects of various reform
options. 
See Recommendation 1 of
our 2024/25 action plan. 
200

Page 201

Appendix 3 | 33 
Appendix 3
Supporting national and performance audit reports 
Report name Date published
Local government budgets 2024/25 15 May 2024
Scotland’s colleges 2024 19 September 2024
Integration Joint Boards: Finance and performance 2024 25 July 2024
The National Fraud Initiative in Scotland 2024 15 August 2024
Transformation in councils  1 October 2024
Alcohol and drug services 31 October 2024
Fiscal sustainability and reform in Scotland  21 November 2024
Public service reform in Scotland: how do we turn rhetoric
into reality?
26 November 2024
NHS in Scotland 2024: Finance and performance 3 December 2024
Auditing climate change 7 January 2025
Local government in Scotland: Financial bulletin 2023/24 28 January 2025
Transparency, transformation and the sustainability of council
services
28 January 2025
Sustainable transport  30 January 2025
A review of Housing Benefit overpayments 2018/19 to 2021/22:
A thematic study
20 February 2025
Additional support for learning 27 February 2025
Integration Joint Boards: Finance bulletin 2023/24 6 March 2025
Integration Joint Boards finances continue to be precarious 6 March 2025
General practise: Progress since the 2018 General Medical
Services contract
27 March 2025
Council Tax rises in Scotland 28 March 2025
201

Page 202

North Ayrshire Integration Joint
Board
2024/25 Annual Audit Report 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
202

Page 203

Integration Joint Board
25th September 2025
Subject: 2025-26 – Month 4 Financial Performance 
Purpose: To provide an overview of the IJB’s financial performance as at
Month 4 (July). 
Recommendation: It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for the
financial year 2025-26 and the current overall projected year-end
overspend of £5.259m reducing to £1.733m after planned recovery
actions;
(b) notes the progress with delivery of agreed savings;
(c) approves the actions which are being taken to progress financial
recovery and that an updated recovery plan will be presented to the
next IJB; 
(d) note the projected overspend position of £0.134m for services
managed under Lead Partnership arrangements by South Ayrshire
HSCP and request that a financial recovery plan is proposed to bring
the budget back online for 2025/26;
(e) note that services managed in East Ayrshire under Lead
Partnership arrangements are projected to overspend by £0.430m and
that a financial recovery plan will be presented to the IJB on 29 October
2025 for formal approval; and
(f) notes the remaining financial risks for 2025-26; 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
MDT Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework
MDT Multi-Disciplinary Team
Agenda Item 11
203

Page 204

1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of July further work is undertaken following the month
end to finalise projections, therefore the projected outturn position is as current and
up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £5.259m (1.5%) reduced to
£1.733m through already identified financial recovery actions. There is an increasing
risk to achieving financial balance during 2025-26, the projected outturn position is
summarised below with the residual risk following already identified financial
improvement actions: 
TOTAL Health/  
NHS AA
Social
Care/NAC
Projected Overspend @ mth4 5.259 2.051 3.208
Financial Recovery Plan Projections (3.526) (1.275) (2.251)
Residual Risk 1.733 0.776 0.957 
The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds. 
The projection assumes all mitigations and controls established in 2024-25 continue
throughout 2025-26 as it is recognised that the same uncertainty and risks remain
into 2025-26 and there needs to be tight grip and control over expenditure overall. 
1.3  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical disability care packages, supplementary
staff in wards, staff costs in Montrose House and Unplanned Activities (UnPACs)
within the lead partnership for mental health. 
1.4 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The overspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism.  There is a requirement for the 3 IJBs to be
aware of the position for Lead Partnership services and plans to deliver services from
within allocated budget, on that basis further information will be brought forward with
further detail on Lead Partnership services. 
204

Page 205

1.5 Since the setting of the budget in March 2025 the 2025/26 financial position has been
adversely impacted by the below factors out-with the control of the IJB. 
• National Care Home Contract (NCHC) – the recent increase to the NCHC rate
to reflect the impact of the nursing pay award resulted in an additional
unfunded cost of £0.175m.
• NHS Board allocation for the Employers National Insurance increase
confirmed at 60% of funding – full year impact £0.664m 
• The current allocation for the Agenda for Change costs in relation to the
reduced working week are currently being queried with the NHS finance team
to ensure we receive our ‘fair share’ of the funding.  The current funding
allocated is £0.659m, the cost of covering all reduced hours is £1.497m,
currently calculating actual cover costs and will request NHS AA review
funding allocation.  This request will be informed by information collated from
services on the actual impact and cost.
• Pay settlements for both NHS and Local Government staff have been agreed
for 2025/26.  The NHS element has been funded, and the current assumption
is that the shortfall between budget planning assumptions and actual
settlements will be fully funded for Local Government staff. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery. 
2.2 FINANCIAL PERFORMANCE – AT MONTH 4 
At month 4 against the full-year budget of £341.975m there is a projected year-end
overspend of £5.259m (1.5%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £3.208m in social care services and a projected
overspend of £2.051m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and the capacity of providers to take on work. 
Appendix F provides information on the costs of bank and agency staff. 
205

Page 206

2.3 Health and Community Care Services 
Against the full-year budget of £98.615m there is a projected overspend of £4.330m
(4.4%) which is an adverse movement of £0.206m and the main variances are: 
a) Care home placements – net projected overspend of £0.575m. This includes an
overspend on placements of £1.275m which includes a provision for an average
of 7 interim beds and reflects the recent increase to the NCHC to reflect the impact
of the nursing pay award resulted in an additional unfunded cost of £0.175m.   The
adverse movement is mainly due to £0.508m of PD care home placements
transferring to this budget which was approved as part of the recovery plan. 
The budgeted number of permanent placements was 765 and at month 4 there
were 792 placements for older people and 14 PD placements resulting in a
projected overspend of £1.275m. 
The plan to manage down the number of permanent placements to reach the
target is challenging due to the need to respond to referrals from hospital and to
continue to support those in critical and substantial need in the community. 
The overspend is partially offset by income recovered from charging orders which
is projected to be £0.700m over recovered. This income is challenging to predict
as it depends on the length of the legal process and time taken to sell the property
that the charging order is registered to. 
b) Care at home is projected to be £1.672m overspent (£0.031m adverse). The
position reflects the cost of meeting the significant demand and level of provision
for care at home support.   
c) Physical Disability Services – projected overspend of £0.429m (£0.494m
favourable) split as follows: £0.845m over in residential placements, £0.240m
under in direct payments and £0.176m under in community care packages.  The
favourable movement is due to the transfer of £0.508m of PD cases to the older
people care home placement budget. 
d) Integrated Island Services is projected to overspend by £0.311m (£0.045m
adverse).  The most significant variance is a projected overspend at Montrose
House of £0.133m (£0.056m favourable) which relates to the net overspend on
agency staff (i.e. net of underspend on employee costs) and overspends across
property, continence and medical supplies, admin and transport.   The Arran
Patient Transfer contract is projected to overspend by £0.040m. 
e) Specialist Rehab wards – projected overspend of £0.190m (£0.024m favourable)
(Redburn ward £0.234m overspend and Douglas Grant £0.044m underspend). 
The overspend is due to cover costs for vacancies as well as supplementary
staffing for patients who require one to one support. 
206

Page 207

f) Wards 1 and 2 – Projected overspend of £0.783m (£0.044m favourable). The
overspend is due to increased use of supplementary staffing.   All rehabilitation
wards are operating at 100% occupancy supporting a high level of patient
needs/complexity, which places pressure on staffing levels and the use of bank
and agency staff to support additional patient observations.   The senior manager
has developed an action plan which will reduce this overspend and the reduction
is reflected in the recovery plan. 
g) District Nursing – projected to overspend by £0.093m (£0.007m favourable)
mainly due to an overspend on continence supplies. 
2.4 Mental Health Services 
Against the full-year budget of £120.719m there is a projected overspend of £0.605m
(0.5%) which is a favourable movement of £0.335m prior to the re-allocation of the
Lead Partnership variance to East and South HSCP.   
The main variances are:
• Learning Disabilities are projected to overspend by £0.620m (£1.044m
adverse).  It should be noted that most of the adverse movement is due to the
all-age disability budgets being transferred from children’s services to
Learning Disabilities and this resulted in an adverse movement of £1.094m.
This £1.094m is across residential placements (£1.481m over), direct
payments (£0.317m under) and community packages (£0.178m under).   The
main historic LD budget is projected to underspend by £0.385m across
community care packages (£0.699m under), direct payments (£0.231m over)
and residential placements (£0.034m over).  This improvement from 2024-25
reflects the positive impact of assertive reviews of care packages and
increased clawbacks from direct payments. 
• Community Mental Health services are projected to underspend by £0.154m
(£0.059m favourable movement) across community care packages (£0.538m
under), direct payments (£0.167m over), residential placements (£0.347m
over) and Nethermains (£0.103m under). The main reason for underspend in
community packages is the availability and capacity of adult community
providers to deliver new packages of care. 
• There is a projected underspend of £0.353m in relation to the cost of Hospital
Based Complex Continuing Care (HBCCC), this reflects the impact of change
in provision for these services.  There were plans to reinvest this in the service,
but these plans are on hold as holding the funding was agreed as part of the
recovery plan at month 3.
207

Page 208

• The Lead Partnership for Mental Health is projected to be £0.486m overspent
(£1.321m favourable) and the main variances are as follows: 
• Adult Inpatients – projected overspend by £0.639m (£0.267m adverse)
due to very high levels of continuous intervention which require
additional supplementary staff and enhanced observations (1:1 and
2:1) and use of bank staff. There is an overspend of £0.288m at month
4 but this is partially offset by a recharge to another HSCP on a cost
basis for an outwith authority placements which has incurred additional
costs in relation to usage of supplementary staffing due to sustained
enhanced observations. 
• The UNPACS (Unplanned Activities) budget – projected overspend of
£1.353m (£0.016m favourable) based on current placements. UnPACS
placements are for individuals with very specific needs that require a
higher level of security and/or care from a staff group with a particular
skill set/competence.  There are no local NHS secure facilities for
women, people with a learning disability or people with
neurodevelopmental disorder. This can necessitate an UNPACs
placement with a specialist provider which can be out-of-area.  The
nature of mental health UNPACs spend is that it is almost exclusively
on medium- or long-term complex secure residential placements which
are very expensive so a small change in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions
between units or levels of security can take many months. Applications
to approve a placement are made to the Associate Medical Director for
Mental Health who needs to be satisfied that the placement is
appropriate and unavoidable prior to this being agreed. Part of the
additional control measures agreed in month 3 was to expand the high-
cost care package review group to include all UNPACS placement
requests. 
• Learning Disability Services – projected to overspend by £0.056m
(£0.045m favourable).  This relates to the potential delays in achieving
the saving from Trindlemoss moving from a nursing to social care
model.  The progress with this was impacted by the requirement to
close Ward 7A in July 2025.   It is assumed that Ward 7A budget will
be online as the use of bank staff will reduce. 
• Elderly Inpatients – projected overspend of £0.133m (£0.131m
favourable) due to the use of supplementary staffing.  The elderly
mental health wards continue to operate at full occupancy and at times
with waiting lists, with several patients who are on enhanced
observations and bank costs remain high. 
208

Page 209

• Eating Disorders – projected to overspend by £0.127m (£0.002m
favourable movement) due to the staffing level being higher than the
funding allocation.  This is being considered alongside the overall
resource allocation. 
• Enhanced Mental Health Outcome Framework (EMHOF) – projected
underspend of £0.624m.  There was £0.624m of reserves held for
EMHOF and the recovery plan approved the draw down of these
reserves which is the reason for the favourable movement.   
• Psychiatry – is projected to overspend by £0.292m (£0.023m adverse)
mainly due to junior doctor costs. A mitigation plan is being developed
and the rota for junior doctors is being reviewed. 
• MH Pharmacy – is projected to overspend by £0.036m (£0.360m
favourable),  This favourable movement is mainly due to a prior year
rebate.  Prior to this rebate there was an overspend due to increased
demand and cost of medicines, and particularly the cost of Buvidal. 
This position is after investing £0.510m on a Pan Ayrshire basis
(£0.170m per HSCP). 
• Action 15 – is projected to underspend of £0.229m (£0.497m
favourable). There was £0.487m of reserves held for Action 15 and the
recovery plan approved the draw down of these reserves which is the
reason for the favourable movement.  The projected underspend is
after considering the legacy costs from the 2024/25 review of funding.   
 Innovation Fund – projected underspend of £0.025m (no movement)
assuming that the posts to be redeployed as part of the EMHOF review
are actioned. 
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £0.701m
(adverse movement of £0.173m) in 2025-26.  Further information is
included in the table below: 
Vacancy Savings Target (£1.160m)
Projected to March 2026 £1.688m
Over/(Under) Achievement £0.528m
2.5 Children and Justice Services 
Against the full-year budget of £41.619m there is a projected overspend of £1.606m
(3.9%) which is a favourable movement of £0.924m and the main variances are:
209

Page 210

a) Care Experienced Children and Young People is projected to overspend by
£1.915m (£0.942m favourable).  This favourable movement is primarily due to the
children with disabilities budget moving to Learning Disabilities. Some of these
costs are offset by the contribution from the Home Office for Unaccompanied
Asylum-Seeking Children which is detailed below. 
The main areas within this are noted below: 
• The children’s residential placements are projected to overspend by £2.691m
(£0.037m favourable) based 34 placements in month 4. This demonstrates an
increase of 5 places since the start of the financial year. There are several
factors leading to this challenging position: 
o We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy or over for some
time, leading to increased use of external placements where residential
care is required.
o There remains an acute shortage of foster carers leading to residential
care being necessary in emergency placement situations. 
o The requirement to support Unaccompanied Asylum-Seeking Children
(UASC) under the National Transfer Scheme and to support trafficked
young people who have been identified in North Ayrshire.
o A number of young people in residential care have requested Continuing
Care, whereby a young person can remain in their placement until age
21.
o Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases is
shared 50/50 with Education services. 
o Contractual inflation has still to be agreed for most placements and it is
likely that this will increase the projected costs of residential places which
is outwith the control of the service.
o Children’s Services are continuing to work with other services including
Education and Housing to address the challenges through the work of the
‘Brighter Pathways’ Programme Board and associated workstreams. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.905m (£0.014m adverse) underspent. 
• Residential respite – placements are overspent by £0.073m (no movement).
These short-term placements are used to prevent an admission to full time
care or to avoid placement breakdown. 
• Employee costs – are projected to overspend by £0.071m (£0.079m
favourable movement), largely due to staffing levels in the children’s houses
and regrading of posts. 
210

Page 211

• Care Leavers – projected underspend of £0.071m (no movement) in rent
costs. 
• Section 29 Payments (Throughcare Team) are projected to overspend by
£0.064m (no movement). 
b) Head of Service – is projected to underspend by £0.568m (£0.020m favourable).
This consists of a projected overspend of £0.166m  (£0.030m favourable) to the
previous saving in relation to the staff reconfiguration in the children’s houses
which was not achieved in 23-24 or 24-25 and this is offset by the grant funding
in relation to Unaccompanied Asylum-Seeking Children (UASC), which is
projected to amount to £0.764m (£0.028m adverse) and which contributes to
costs incurred across a number of C&F service areas.   
c) C&F Health Team – is projected to overspend by £0.144m (£0.023m adverse)
mainly in relation to the Band 6 to 7 regrade for Health Visitors and the
progression of posts up the Band 7 scale.  Part of this recurring cost was
incorporated into budget pressures for 2025/26. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
This is projected to underspend by £0.204m (£0.001m favourable). One contract has
ceased at the end of June and there are savings against other areas.  There is also
an over-recovery of income in Learning and Development for social work student
placements. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.026m
(£0.089m adverse) and the main areas of variance are: 
• There is projected slippage on the LD and MH transition funding of £0.263m
(£0.017m favourable) due to delays in children transitioning into adult
services. This involves complex planning by services with service users and
families and can change over time based on assessed need when moving into
adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   
211

Page 212

• There is also a balance of overachieved savings of £0.061m (no movement)
as a result of the 25/26 budget decision. 
• NHS shortfall in savings of £0.406m which is not coded to specific areas and
held centrally until recurring savings can be identified.
• An over-recovery of payroll turnover of £1.100m (£0.100m adverse) for social
care services and an over-recovery of £0.302m (£0.101m adverse) for health
services as outlined in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (£3.400m) (£1.567m)
Projected to be achieved by March
2026
£4.500m £1.869m
Over/(Under) Achievement £1.100m £0.302m  
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.  
As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. 
For 2025/26 there will be a further recruitment delay with vacancy scrutiny approved
vacancies being held for four weeks before they are advertised to create more payroll
turnover.  This will be for all vacancies except clinical or registered services
vacancies or those which will incur cover costs. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed separately within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2025-26 budget included £4.019m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 4
£m
Red - 1.000
Amber 2.984  1.041
Green 1.035 0.686
Blue - 1.292
TOTAL 4.019 4.019 
212

Page 213

b) The main area to note is that the red savings have increased since month 3
as the saving in relation to the Brighter Pathways is not as certain.   
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount (£000)
1 Virement to Medical Directorate from Mental Health
Admin (0.028)
2 Primary Care Prescribing Tariff Reduction  (0.556) 
2.11  Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis. 
The outturn in relation to North Lead Partnership services is not fully attributed to the
North IJB as a share is allocated to East and South Partnerships; similarly, the impact
of the outturn on East and South led services is shared with North. At Month 4 the
MH lead partnership is projected to overspend by £0.485m (£0.159m NRAC share
for East and £0.139m for South). 
South HSCP (month 3 info) – projected overspend of £0.134m of which £0.050m
(no change) will be allocated to North. The variance is mainly due to an overspend
of £0.080m in the community store.  This includes the costs of replacing mattresses,
repairs and maintenance contract and equipment costs. There is also a projected
overspend of £0.058m in the Family Nurse Partnership as the SG funding was based
on the mid-point of the salary scale and all post are now at the top point of the scale. 
This will be a pressure in 2026/27. 
East HSCP (month 4 info) - projected overspend of £0.430m (of which £0.159m will
be allocated to North - £0.119m adverse movement). The main variances are: 
213

Page 214

• The Primary Care and Out of Hours Services budget £134.522m budget is
projected to overspend by £0.622m. 
There are projected additional costs within Primary Care Contracting and
Support £0.493m, due to a number of variances, including new Office 365
licence costs, additional spend related to the GP’s Sub-Committee and
staffing costs. Primary Medical Services are projected to overspend by
£0.688m, due to additional staffing costs, including increased pension and
sickness cover costs. These projected additional costs are being partially
offset by a projected underspend £0.170m against Ayrshire Urgent Care
Services based on Summer/Winter module. Funding has been allocated to
fully offset Urgent Care Pathway costs £0.823m, as well as Covid-19
Therapeutics of £0.274m, with costs projected at £0.233m. 
There is a £0.304m underspend in Dental services that reflects that staffing
numbers are running at less than establishment. 
• Prison and Police Healthcare (Lead Partnership)
The £0.106m projected overspend at month 4 is largely due to increase
prescribing costs and is partially offset by reduced staffing costs. Prison
prescribing was highlighted as a budget pressure as part of the 2025/26
budget. Both East and South Ayrshire IJBs have approved additional funding
to offset this pressure however North Ayrshire IJB did not provide for this in
their approved budget. The additional funding has not been allocated against
the prescribing budget at this stage, with further pan-Ayrshire discussions to
be undertaken to determine how to account for this in the current financial year
and going forward. It is anticipated that the Prison and Police Healthcare
projected overspend highlighted in this report will reduce as a consequence
of this work. 
• Allied Health Professions (Lead Partnership)
There is a projected underspend of £0.445m on AHPs services hosted by East
Ayrshire for the current year, which mainly relates to staffing savings. 
• Other Services (Lead Partnership)
The £0.146m projected overspend is due to increased Area Wide Evening
Services costs, mainly due to additional staffing costs including high use of
bank staff, which will require to be addressed going forward. 
• An initial financial recovery plan for East Hosted Services will be developed
and progressed and will be brought to the IJB on 29 October 2025 for formal
approval. This financial recovery plan will also require to be approved by North
and South Ayrshire IJBs. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
214

Page 215

arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.            
Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how these compare to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive.  
The HSCPs require to agree their final share of the baseline with each other,
however the aggregate will remain unchanged. The table below shows the cost of
the historic baseline at 2024/25 prices. The 2025/26 actual usage information is not
known until later in the year.   
IJB
Baseline at
2024/25
prices     
(£)
East 31.870
North 39.966
South 34.488
Total 106.324  
The annual budget for Acute Services is £488.0million.  The directorate is overspent
by £10.5 million after 4 months including legacy CRES.  
This was caused by overspends on medical and nursing staff, together non pay
overspends on equipment and supplies. These are required due to the level of
operational pressure experienced. Unfunded beds contributed an overspend
of £2.2m after 4 months. 
Within the overall £10.5m overspend Medicine are over by £4.5m, Emergency Care
by £3.6m, Surgery by £1.0m, Labs and Diagnostics by £1.2m and Women and
Children by £0.9m. Legacy CRES and underspends on other budgets make up the
difference.   
There is a material underlying deficit caused by:  
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and
Arran acute hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
215

Page 216

The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
In respect of Lead Partnership Services, the 3 Chief Officers and CFOs have met to
consider improvements in the reporting and visibility of financial and operational
performance for those services which we lead or are led by another HSCP.  Actions
have been agreed to develop more regular shared information to be shared across
all 3 IJBs with an intention to incorporate this further detail into future financial
monitoring reports during 2025/26.   
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position. 
• Current overspend areas, especially in low volume / high-cost services e.g.
Children’s residential placements, UNPACs, and supplementary staffing
across community, mental health and learning disability wards.
• Growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• Pay settlements for both NHS and Local Government staff have been agreed
for 2025/26.  The NHS element has been funded, and the current assumption
is that the shortfall between budget planning assumptions and actual
settlements will be fully funded for Local Government staff.
• Unearmarked reserves are depleted, there is no scope to absorb in-year
variances, with any overspends requiring additional funding from partners.
• The ongoing review of the Integration Schemes, where there is a focus on
financial arrangements and risk share. 
• The wider system financial challenges and impact across the whole system,
for example the financial position of NHS AA and the decisions taken to
reduce the Board’s deficit may have impacts on other parts of the health and
care system. 
• Removal of brokerage for NHS Boards, NHS AA have been asked by Scottish
Government to deliver further financial improvement beyond their Board
approved financial plan. 
• The overall sustainability of commissioned care providers, with eNICs
compounding historic challenges re financial sustainability, there is a
heightened risk of provider failure leading to handing back of care and
contracts.
• The ongoing ability to source packages of care for service users.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
216

Page 217

• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The use of supplementary staffing for enhanced observations across a
number of service areas and the use of high-cost agency staff to support
frontline service delivery in areas where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. 
• Scot Excel inflationary increases for children’s services have been
significantly higher than assumed.
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire. 
These risks will continue to be monitored during 2025/26. 
2.13 RESERVES 
The IJB opening reserves position, subject to completion of the 24/25 audit, is
summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2025 -  2.381 0.780 3.161
Anticipated Drawdown -  (2.381) (0.780) (3.161)
Balance – 31 March 2026 -  - - - 
The £0.780m HSCP earmarked reserve relates to the Service Redesign and Change
Fund which is fully committed in 2025/26. 
Further detail on the reserves is given in Appendix D. 
2.14 Financial Recovery Plan 
The IJB set a balanced budget for 2025/26 on 20th March 2025. This did not include
any draw on reserves but did include the approval of £4.019m of savings to achieve
financial balance. Services will continue to work towards implementing the recovery
plan to deliver cost reduction targets while carefully managing the level of risk. This
will include the preparation of equality impact assessments. 
The management actions and governance framework outlined below which were
agreed in 2024/25 will continue throughout 2025/26: 
MANAGEMENT ACTIONS/CONTROLS AGREED IN 2024/25 
217

Page 218

• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working.
• Ongoing review of future year savings or transformation programmes to
identify scope for acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund
(ILF) Scotland. 
GOVERNANCE MEASURES AGREED IN 2024/25 
• Establishment a ‘Finance Working Group’, chaired by the IJB Chair or Vice
Chair. The Director and Heads of Service are members of the group. It meets
monthly to facilitate increased oversight and scrutiny of the financial position
and transformation programme as well as detailed budget planning for future
financial years. 
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams, including
line by line reviews of all budget areas.   
MANAGEMENT ACTIONS/CONTROLS AGREED IN 2025/26 (AUGUST 2025) 
• Recruitment delay – there will be a recruitment drag with vacancy scrutiny
approved vacancies being held for four weeks before they are advertised to
create more payroll turnover.  This will be for all vacancies except clinical or
registered services vacancies or those which will incur cover costs.
• High-cost care package group – the remit of this group will be expanded to
include care packages for children with a disability and all UNPACs placement
requests.
• Oversight group for looked after and accommodated children in residential
care – this group meets fortnightly to actively review all placements. 
NEW ACTIONS: 
• The senior managers for the main areas of overspend have been tasked with
preparing an SBAR reports to be considered at the PSMT.  This will cover
current action being taken to reduce the overspend and future planned action. 
This will inform the update to the month 6 recovery plan.  These actions will
218

Page 219

be tracked each reporting period and if progress is not being made an update
will be made to the finance working group and IJB.
• The Director and Chief Finance Officer have started a rolling programme of
one-to-one meetings with individual budget holders across the HSCP to
consider opportunities for cost reduction, service change and any spend to
save propositions – to support the development of the 2026/27 budget but
also to identify further cost reductions for the current financial year. 
RECOVERY ACTIONS – MONTH 4 UPDATE 
• The updated recovery action is outlined in Appendix E.  This includes the
proposals agreed at month 3 and updated progress at month 4 and any
changes to target reductions.  The actions are a mix of cost reduction targets
across various services and a drawdown of reserves. At month 3 the position
was: 
TOTAL Health/
NHS AA
Social
Care/NAC
Projected Overspend @ mth3 5.187 2.271 2.916
Financial Recovery Plan Projections (4.012) (1.752) (2.260)
Residual Risk 1.175 0.519 0.656 
• At month 4 this has deteriorated to: 
TOTAL Health/  
NHS AA
Social
Care/NAC
Projected Overspend @ mth4 5.259 2.051 3.208
Financial Recovery Plan Projections (3.526) (1.275) (2.251)
Residual Risk 1.733 0.776 0.957 
• This plan will be reviewed each month and further recovery actions will be
presented to the IJB for approval. 
PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2025-26 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
219

Page 220

3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2025-
26. 
4. IMPLICATIONS  
4.1 Financial
The outturn is an overall year-end overspend of £5.259m (1.5%) prior to recovery
action. The report outlines the main variances for individual services.  The IJB
unearmarked reserve balance is zero. This current position poses a financial risk to
North Ayrshire Council and NHS Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP.
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
The ‘financial viability of the HSCP’ risk on our strategic risk register. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2025-26 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout
2025-26. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION 
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team.
220

Page 221

5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director
Author – Eleanor Currie, Chief Finance Officer 
[eleanorcurrie@north-ayrshire.gov.uk] 
221

Page 222

PUBLIC INFORMATION
2025-26 Budget Monitoring Report–Objective Summary as at 31st July 2025                                                                 Appendix A   
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 77,507 80,514 3,007 21,108 22,431 1,323 98,615 102,945 4,330 4,124 206
: Locality Services 32,828 33,942 1,114 5,914 6,006 92 38,742 39,948 1,206 1,137 69
: Community Care Service Delivery 40,500 42,245 1,745 0 40,500 42,245 1,745 1,624 121
: Rehabilitation and Reablement 2,108 2,118 10 0 2,108 2,118 10 (21) 31
: Long Term Conditions 868 915 47 10,661 11,677 1,016 11,529 12,592 1,063 1,123 (60)
: Community Link Workers 384 379 (5) 0 0 0 384 379 (5) (5) 0
: Integrated Island Services 819 915 96 4,533 4,748 215 5,352 5,663 311 266 45
MENTAL HEALTH SERVICES 40,722 41,195 473 79,392 79,524 132 120,114 120,719 605 940 (335)
: Learning Disabilities 31,712 32,332 620 747 747 0 32,459 33,079 620 (424) 1,044
: Community Mental Health 7,015 6,861 (154) 1,831 1,831 0 8,846 8,692 (154) (95) (59)
: Addictions 1,995 2,002 7 1,899 1,899 0 3,894 3,901 7 6 1
: HBCCC 0 0 0 353 0 (353) 353 0 (353) (353) 0
: Lead Partnership Mental Health NHS Area Wide 0 0 0 74,562 75,047 485 74,562 75,047 485 1,806 (1,321)
CHILDREN & JUSTICE SERVICES 35,862 37,307 1,445 5,757 5,918 161 41,619 43,225 1,606 2,530 (924)
: Irvine, Kilwinning and Three Towns 3,122 3,184 62 0 0 0 3,122 3,184 62 50 12
: Garnock Valley, North Coast and Arran 3,538 3,595 57 0 0 0 3,538 3,595 57 54 3
:Intervention Services 1,788 1,793 5 0 0 0 1,788 1,793 5 9 (4)
: Care Experienced Children & Young people 22,550 24,465 1,915 0 0 0 22,550 24,465 1,915 2,857 (942)
: Head of Service - Children & Families 1,336 769 (567) 0 0 0 1,336 769 (567) (548) (19)
: Justice Services 3,099 3,099 0 0 0 0 3,099 3,099 0 0 0
: C&F Health Team 429 402 (27) 4,995 5,140 145 5,424 5,542 118 95 23
: Lead Partnership NHS Children's Services 0 0 0 762 778 16 762 778 16 13 3
CHIEF SOCIAL WORK OFFICER 1,954 1,750 (204) 0 0 0 1,954 1,750 (204) (205) 1
PRIMARY CARE 0 0 0 54,591 54,627 36 54,591 54,627 36 (69) 105
ALLIED HEALTH PROFESSIONALS 0 11,349 11,350 1 11,349 11,350 1 0 1
MANAGEMENT AND SUPPORT COSTS 10,510 8,997 (1,513) 3,223 3,710 487 13,733 12,707 (1,026) (1,115) 89
OUTTURN ON A MANAGED BASIS 166,555 169,763 3,208 175,420 177,560 2,140 341,975 347,323 5,348 6,205 (857)
Return Hosted Over/Underspends to East 0 0 0 0 (159) (159) 0 (159) (159) (591) 432
Return Hosted Over/Underspends to South 0 0 0 0 (139) (139) 0 (139) (139) (517) 378
Receive Hosted Over/Underspends South 0 0 0 0 50 50 0 50 50 50 0
Receive Hosted Over/Underspends East 0 0 0 0 159 159 0 159 159 40 119
OUTTURN ON AN IJB BASIS 166,555 169,763 3,208 175,420 177,471 2,051 341,975 347,234 5,259 5,187 72
Over/
(Under)
Spend
Variance at
Period 3
Movement in  
variance
from Period
3
TOTAL
Partnership Budget - Objective Summary
Council Health
2025/26 Budget
222

Page 223

2025-26 Savings Tracker          Appendix B 
Social Care:   
Ref Description
Deliverability
Status at
budget
setting
Deliverability             
Month 4
2025/26
Saving  
Previously Agreed Savings (Full year impact)      
1 Review of Day Care provision Green Blue 0.100
2 Service redesign  (CAAST Team and Corporate Parenting team) Green Blue 0.034  
Adjustments      
3 Payroll Turnover Green Blue 0.099  
Mental Health      
4 LD Responder Service Amber Amber 0.150  
Children, Families & Criminal Justice      
5 Brighter Pathways Amber Red 1.000  
Community Care & Health      
6 Review of Day Care provision Amber Blue 0.107
7 Care at Home Amber Green 0.500  
Cross Service 
8 Care Package Review (all services) Amber Amber 0.200
9 Deletion of vacant posts Green Blue 0.056
10 Increase to charging Green Green 0.186
11 Admin Post Savings Green Blue 0.114
12 Financial Inclusion  Green Blue 0.357 
TOTAL SOCIAL CARE SAVINGS   2.903 
223

Page 224

Health:   
Ref Description
Deliverability
Status at
budget
setting
Deliverability             
Month 4 
2025/26
Saving 
Adjustments      
13 Increase recharge to East Ayrshire for beds at Woodland View Green Blue 0.010
14 Payroll Turnover Green Blue 0.079 
Other Savings      
15 Admin Savings Amber Blue 0.186 
16 Trindlemoss House - move to social care model Amber Amber 0.250 
17 EICT/Rehab Amber Blue 0.150 
18 Community MH/Wellbeing Review Amber Amber 0.100 
19 Ward 7A - Woodland View Amber Amber 0.341 
TOTAL HEALTH SAVINGS   1.116 
TOTAL NORTH HSCP SAVINGS   4.019 
224

Page 225

2025-26 Budget Reconciliation               Appendix C 
COUNCIL  Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     137.739
Adjustments to baseline     0.014
Revised Budget     137.753
Resource Transfer 25/26 1-3   25.447
Additional Funding - 24/25 Adult Social Care
RLW 1-3 P 0.073
Additional Funding RLW 1-3 P 0.126
Additional Funding - Money Smart 1-3 P 0.094
ICT Transfers 1-3 P (0.005)
Additional Funding - Whole Family Wellbeing
Funds 1-3 T 0.179
CJSW - S27 1-3 P 3.280
Development of People working in Childrens
SW 1-3 P (0.390)
Roundings 3   (0.002)
Social Care Budget Reported at Month 4 166.555 
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Budget exc set aside     161.934
Month 10-12 Adjustments and adjusting
for the full year impact of part years
amounts and temporary funding.    
8.532
Revised Budget     170.466
Resource Transfer 24/25     24.640
Resource Transfer 25/26     (25.447)
NORTH NATIONAL INS 25-26 AMBUS 1   0.997
PRESCRIBING 25-26 AMBUSH 1   2.754
PRESCRIBING CRES 25-26 AMBUSH 1   (0.715)
Training Grade Adj - April 1   (0.058)
Training Grade Rates Adj - April 1   0.030
MH: Anticipate PDS Dementia (North) 25/26 1   0.094
MH: Anticipate Delivery of Veteran Specific
25/26 1   0.105
Anticipated RWW from SG 1   0.659
Anticipate 20% Tranche 2 ADP 1   0.174 
225

Page 226

HEALTH Period 
Permanent
or
Temporary
£'m
Training Grade Adj - May 2   (0.013)
Bwp 25-26 East Chest Heart Stroke 2   0.001
Bwp 25-26 East Nest Expansion 2   0.023
Bwp 25-26 East - Sds Advice Service 2   0.013
Bwp 25-26 East Sub Prescribing 2   0.170
25-26 South Budget Paper - North Substitute
Prescribing 2   0.170
25-26 South Budget Paper - Pan Ayrshire
Chest Heart And Stroke 2   0.001
25-26 North Budget Paper - Pan Ayrshire
(vision Support Service 2   (0.005)
25-26 North Budget Paper - Pan Ayrshire
(community store) 2   (0.155)
HD52: EARLY INTERVENTION PSYCHOSIS 3   0.100
25-26 Pay Award Increase North 3   1.179
Training Grade Adjustment (Dean Funding) 4   0.011
Medical Pay Award - Senior Medical -
Additional 1% 4   0.086
Medical Pay Award - Specialty Doctors -
Additional 1% 4   0.006
Virement to Medical Directorate from Mental
Health Admin 4   (0.028)
Transfer MAT Standards Psychiatrist 0.2
WTE 4   0.029
Primary Care Prescribing Tariff Reduction 4   (0.556)
BBV transfer from Public Health 4   0.269
ANTICIPATED BUDGETS INCL HERE (NOT IN
LEDGER) 4   0.419
Roundings     0.001
Health Budget Reported at Month 4 175.420
TOTAL COMBINED BUDGET      341.975 
226

Page 227

25-26 IJB Reserves Position      Appendix D 
Area of Reserves
Balance
at 31
March
2025
Earmarked Funds £
: Alcohol & Drug Partnership 353           
: Mental Health Action 15 135           
: Primary Care Improvement Fund 46              
: Service Redesign / Challenge Fund 780           
: Family Wellbeing Fund 934           
: Breastfeeding Network 36              
: MH Recovery and Renewal /Enhanced MH
Outcome Framework 365           
: Early Intervention in Psychosis 92              
: LD funding 82              
: Donation (Police Scotland) 1                 
: Primary Care Improvement Fund IP 303           
: GP Premises Improvements - tranches 1 and 2 3                 
: Dental Practice Improvement 29              
: Appropriate Adult 2                 
Total Earmarked 3,161       
227

Page 228

Financial Recovery Action Plan          Appendix E 
FINANCIAL RECOVERY PLAN
£m £m
Projected Overspend at Month 4 5,259 5,259
SERVICE AREA
Orginal
Cost
reduction
target
Revised
Target at
Month 4
Achieved
at Month
4
Still to be
achieved
Target set                 
(IJB Date) Comment
a) Care home placements (60) (568) 0 (568) August 2025 -
month 3 report
This will bring the overall budget for
placements and charging order income online. 
b) Physical Disability Services (res,
community and DPs)
(575) 0 0 0 August 2025 -
month 3 report
Some PD residential packages £508K (prev
£575K) have moved to the older people Care
Home placements budget.  The older people
placements will need to manage  this transfer
within the existing budget.
c) Specialist Rehab wards (75) (75) (24) (51) August 2025 -
month 3 report
Based on planned action developed by the
senior manager.
d) Wards 1 and 2 (275) (275) (44) (231) August 2025 -
month 3 report
Based on planned action developed by the
senior manager.
e) Care at Home (300) (300) 0 (300) August 2025 -
month 3 report
Reflects the potential reduction to costs as an
impact of the SG investment in unscheduled
care
TOTAL (1,285) (1,218) (68) (1,150)
a) Learning Disabilities 0 0 0 0 August 2025 -
month 3 report
b) Community Mental Health services 0 0 0 0 August 2025 -
month 3 report
c) Lead Partnership for Mental Health :
- Adult Inpatients (150) (150) 0 (150) August 2025 -
month 3 report
Inpatient Review being undertaken
- Elderly Inpatients (50) (150) (50) (100) August 2025 -
month 3 report
Inpatient Review being undertaken 
-  Psychiatry (150) (150) (150) August 2025 -
month 3 report
Junior doctor rota still to be revised.
- Action 15 Reserves (486) (486) (486) 0 August 2025 -
month 3 report
Draw down of the full pan Ayrshire reserve -
agreed with the CFOs at East and South 
- Enhanced MH Outcome Framework
Reserves
(624) (624) (624) 0 August 2025 -
month 3 report
Draw down of the full pan Ayrshire reserve -
agreed with the CFOs at East and South
NORTH AYRSHIRE ELEMENT  38.65% (564) (603) (448) (155) August 2025 -
month 3 report
TOTAL (564) (603) (448) (155)
Health and Community Care Services
Mental Health Services
No cost reduction proposed but the service
need to maintain the current position.  All new
placements need to be offset by discharges or
reductions from care package reviews.
228

Page 229

FINANCIAL RECOVERY PLAN
SERVICE AREA
Orginal
Cost
reduction
target
Revised
Target at
Month 4
Achieved
at Month
4
Still to be
achieved
Target set                 
(IJB Date) Comment
Children and Justice Services
a) Residential Placements (1,000) (1,000) 0 (1,000) August 2025 -
month 3 report
Based on some placements moving to
tenancies and other placements moving from
external to in-house provision.
TOTAL (1,000) (1,000) 0 (1,000)
ALLIED HEALTH PROFESSIONALS 0 0 0 0 August 2025 -
month 3 report
No cost reduction proposed but the service
need to maintain the current position.
CHIEF SOCIAL WORK OFFICER 0 0 0 0 August 2025 -
month 3 report
No cost reduction proposed but the service
need to maintain the current position. 
MANAGEMENT AND SUPPORT
a) Payroll turnover (200) (200) 0 (200) August 2025 -
month 3 report
Increase to the current projection based on
dragging vacancies for 4 weeks after vacancy
scrutiny approval.
b) Transition slippage (100) (100) (17) (83) August 2025 -
month 3 report
Based on historic slippage.
c) Contractual inflation (25) (100) 0 (100) August 2025 -
month 3 report
TOTAL (325) (400) (17) (383)
OTHER AREAS
b) Agenda for Change - assume fully
funded
(838) (838) 0 (838) August 2025 -
month 3 report
Based on 100% cost of the half hour reduction
in working week being funded.
(838) (838) 0 (838)
TOTAL RECOVERY ACTION (4,012) (4,059) (533) (3,526)
Remaining projected overspend 1,733
229

Page 230

Bank and Agency Costs to Month 4      Appendix F 
Bank and Agency Costs M1-4 2025-26
1) NHS
4863
(Registered)
4864                      
(Unregistered)
4853
(Registered)
4854
(Unregistered) TOTAL
Average per
month
NORTH CORE SLT ADULT 2,243            2,243                561               
WARD 1 WOODLANDS VIEW 13,014          105,966        118,980            29,745          
WARD 2 WOODLANDS VIEW 10,433          163,458        173,891            43,473          
ACH REDBURN REHAB WARD NRS 13,388          67,121          80,509              20,127          
ACH DOUGLAS GRANT REHAB WD NRS 10,033          15,926          25,959              6,490            
WARD 3 WOODLANDS VIEW NURSING 4,009            163,350        167,359            41,840          
WARD 4 WOODLANDS VIEW NURSING 682               14,566          15,248              3,812            
NEW CLONBEITH NURSING(JURA) 42,815          35,539          78,354              19,589          
WVIEW THE GLEN ECT 1,854            1,095            2,949                737               
WVIEW WARD 10 ACUTE MH NRS 1,342            65,584          66,926              16,732          
WVIEW WARD 8 ACUTE MH NRS 7,224            348,128        355,352            88,838          
WARD 5 WOODLANDS VIEW 358               7,738            8,096                2,024            
WVIEW WARD 7B REHAB MH NRS 2,302            2,302                576               
NEW DUNURE NURSING(CLONBEITH) 15,397          57,881             73,278              18,320          
MH BED MANAGEMENT 5,180            5,180                1,295            
TRINDLEMOSS 25,494          80,544             106,038            26,510          
ARRAN HOSPITAL NURSING 24,985          16,973          41,958              10,490          
CAMHS UNSCHEDULED CARE 589               589                   147               
EARLY YRS-C/F TEAM 1 599               599                   150               
PACKAGE OF CARE (P) - AMG 47,860          47,860              11,965          
PACKAGE OF CARE (P) - LMO 312               312                   78                 
ARRAN DN 12,413          12,413              3,103            
NC POC TEAM 2 990               990                   248               
NC POC TEAM 3 2,701            2,701                675               
THREE TOWNS DN 101-               101-                   25-                 
IRVINE DN 11,776          11,776              2,944            
NORTH WEST COAST DN 15,024          15,024              3,756            
GARNOCK VALLEY DN 30,150          30,150              7,538            
NORTH AHP MANAGEMENT TEAM 3,515            3,515                879               
LADY MARGARET NURSING 5,274            2,873            8,147                2,037            
PREVENTION + SERVICES SPT TEAM 2,397            2,397                599               
LD HEALTH CHECKS 12,238          12,238              3,060            
NORTH CLDT 5,777            164               5,941                1,485            
LDS MANAGEMENT 2,286            2,286                572               
MHANPS MH UNSCHEDULED CARE 1,720            1,720                430               
MHS INPATIENT MGT 15,722          210               15,932              3,983            
CMHT NURSING-NORTH AYRSHIRE 1,697            1,697                424               
WVIEW WARD 7C FORENSIC REHAB N 2,207            39,395          41,602              10,401          
INTENSIVE COMMUNITY NURSING TEAM 13,430          335               13,765              3,441            
ADULT MENTAL HEALTH LIASION TEAM 13,881          13,881              3,470            
PCMHT NORTH 1,798            1,798                450               
WVIEW WARD 6 LOW SECURE NRS 14,683             54,904          69,587              17,397          
WARRIX AVE 30,178          29,983             60,161              15,040          
ICFN - COMMUNITY PHLEBOTOMY 4,709            4,709                1,177            
WVIEW WARD 7A LD A+T NRS 25,422             25,422              6,356            
WVIEW WARD 9 ACUTE MH NRS 11,528             11,528              2,882            
WVIEW WARD 11 ACUTE MH NRS 11,631             11,631              2,908            
WVIEW WARD 7A LD A+T NRS 402,876        1,804           14,532          419,212            104,803        
WVIEW WARD 9 ACUTE MH NRS 107,700        107,700            26,925          
WVIEW WARD 11 ACUTE MH NRS 48,625          48,625              12,156          
419,132        1,894,961     1,804           14,532          2,330,429 
2) SOCIAL CARE Month 4
Agency Cost
Montrose House 128,839
Mh Acm 13,606
Ld Acm 13,864
TOTAL 156,309
Bank Agency
230

Page 231

Integration Joint Board
25th September 2025
Subject : IJB - Reserves Policy
Purpose : To consider the IJB Reserves Policy following review.   
Recommendation : The IJB is asked to approve the Reserves policy. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
IJB Integrated Joint Board 
1. EXECUTIVE SUMMARY 
1.1 The IJB’s Reserves Policy outlines the statutory and regulatory framework for
reserves and the operation of reserves. 
2. BACKGROUND 
2.1 The current reserves policy was approved in 2022 and is due for review.   
2.2 The purpose of a reserves policy is to: 
• outline the legislative and regulatory framework underpinning the creation, use or
assessment of the adequacy of reserves;
• identify the principles to be employed by the IJB in assessing the adequacy of the
IJB’s reserves;
• indicate how frequently the adequacy of the IJB’s balances and reserves will be
reviewed; and
• set out arrangements relating to the creation, amendment and use of reserves and
balances.
• 
3. PROPOSALS 
3.1 The IJB Reserves Policy has been reviewed and there are no planned changes to the
policy.  
Agenda Item 12
231

Page 232

The role, function and purpose for holding reserves has not changed, with CIPFA
guidance outlining the framework for reserves, the purpose of reserves and some key
issues to be considered when determining the appropriate level of reserves. 
There is no guidance on the minimum level of reserves that should be held. In
determining the prudential target, the Chief Finance Officer/Section 95 Officer must
take account of the strategic, operational and financial risks facing the IJB over the
medium term and the IJB’s overall approach to risk management.  Whilst it is generally
accepted that it is prudent to hold between 2-4% of contingency or free general fund
reserves there is no inclusion of this within the Reserves Policy on the basis of
consideration of this as part of the budget setting process. 
3.2 Anticipated Outcomes 
Improved governance and clarity around the operation of reserves. 
3.3 Measuring Impact 
The level of reserves will be considered as part of the budget setting process each
year and be formally approved by the IJB. 
4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None   
4.5 Risk
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties. 
4.6 Community Wealth Building
None
4.7 Key Priorities
None
5. CONSULTATION 
There was no consultation required or undertaken. 
Eleanor Currie, Chief Finance Officer – Finance at eleanorcurrie@north-ayrshire.gov.uk  
Appendices
• Appendix 1, Reserves Policy
232

Page 233

North Ayrshire Integration Joint Board 
Reserves Policy 
Date Effective: September 2025
Review Date: September 2028 
233

Page 234

1.  Background 
1.1  To assist local authorities (and similar bodies) in developing a framework for
reserves, CIPFA have issued guidance in the form of the Local Authority
Accounting Panel (LAAP) Bulletin 55 – Guidance Note on Local Authority
Reserves and Balances. This guidance outlines the framework for reserves, the
purpose of reserves and some key issues to be considered when determining
the appropriate level of reserves. As the North Ayrshire IJB has the same legal
status as a local authority, i.e. a section 106 body under the Local Government
(Scotland) Act 1973 Act, and is classified as a local government body for
accounts purposes by the Office of National Statistics (ONS), it is able to hold
reserves which should be accounted for in the financial accounts and records
of the IJB. 
1.2  The purpose of a reserve policy is to: 
• outline the legislative and regulatory framework underpinning the creation,
use or assessment of the adequacy of reserves;
• identify the principles to be employed by the IJB in assessing the adequacy
of the IJB’s reserves;
• indicate how frequently the adequacy of the IJB’s balances and reserves
will be reviewed; and
• set out arrangements relating to the creation, amendment and use of
reserves and balances. 
1.3  In common with local authorities, the IJB can have reserves within a usable
category. 
2.  Statutory/Regulatory Framework for Reserves 
Usable Reserves 
2.1  Local Government bodies - which includes the IJB for these purposes - may
only hold usable reserves for which there is a statutory or regulatory power to
do so. In Scotland, the legislative framework includes: 
Usable Reserve   Powers 
General Fund  Local Government Scotland Act 1973 
2.2  For each reserve there should be a clear protocol setting out:  
• the reason / purpose of the reserve;
• how and when the reserve can be used;
• procedures for the reserves management and control; and
• the review timescale to ensure continuing relevance and adequacy. 
234

Page 235

3.  Operation of Reserves 
3.1  Reserves are generally held to do three things: 
• create a working balance to help cushion the impact of uneven cash flows
– this forms part of general reserves;
• create a contingency to cushion the impact of unexpected events or
emergencies – this also forms part of general reserves; and
• as a means of building up funds, often referred to as earmarked reserves,
to meet known or predicted liabilities. 
3.2  The balance of the reserves normally comprises of three elements: 
• funds that are earmarked or set aside for specific purposes. In Scotland,
under Local Government rules, the IJB cannot have a separate Earmarked
Reserve within the Balance Sheet, but can highlight elements of the General
Reserve balance required for specific purposes. The identification of such
funds can be highlighted from a number of sources: 
o future use of funds for a specific purpose, as agreed by the IJB; or
o commitments made under delegated authority by Chief Officer, which
cannot be accrued at specific times (e.g. year end) due to not being
in receipt of the service or goods; 
• funds which are not earmarked for specific purposes, but are set aside to
deal with unexpected events or emergencies; and
• funds held in excess of the target level of reserves and the identified
earmarked sums. Reserves of this nature can be spent or earmarked at the
discretion of the IJB. 
3.3 The Integration Scheme outlines that where there is an underspend in the
operational budget that this can either fund additional capacity in-year or be
carried forward to fund capacity in future years.  Any final underspend in the
operational budget in-year will be credited to IJB General Fund reserve.   
4.  Role of the Chief Finance Officer 
4.1 The Chief Finance Officer is responsible for advising on the targeted optimum
levels of reserves the IJB would aim to hold (the prudential target). The IJB,
based on this advice, should then approve the appropriate reserves strategy as
part of the budget process. 
5.  Adequacy of Reserves 
5.1  There is no guidance on the minimum level of reserves that should be held. In
determining the prudential target, the Chief Finance Officer must take account
of the strategic, operational and financial risks facing the IJB over the medium
term and the IJB’s overall approach to risk management.
235

Page 236

5.2  In determining the prudential target, the Chief Finance Officer should consider
the IJB’s Strategic Plan, the medium term financial outlook and the overall
financial environment. Guidance also recommends that the Chief Finance
Officer reviews any earmarked reserves as part of the annual budget process
and development of the Strategic Plan. 
5.3 In light of the size and scale of the IJB’s responsibilities, over the medium term
it is proposed to hold a prudent level of general reserves. This value of reserves
must be reviewed annually as part of the IJB Budget and Strategic Plan; and in
light of the financial environment at that time. Where it is assessed that the
financial environment at the time of setting the budget does not support a
prudent level of reserves to be held this should be reported to the IJB together
with an aspirational reserves position.  The level of other earmarked funds will
be established as part of the annual financial accounting process. 
5.4 The Integration Scheme states that where there is an overspend in the
operational budget the Parties will consider making interim funds available to
the IJB.  Where funds are not provided and the IJB has insufficient General
Fund reserves the IJB may report a negative reserves position on the Balance
Sheet.  This position must be addressed with a plan agreed between the IJB
and the Parties in relation to future plans to address the negative reserves
position. 
6.  Reporting Framework 
6.1  The Chief Finance Officer has a fiduciary duty to ensure proper stewardship of
public funds. 
6.2  The level and utilisation of reserves will be formally approved by the IJB based
on the advice of the Chief Finance Officer. To enable the IJB to reach a
decision, the Chief Finance Officer should clearly state the factors that
influenced this advice. 
6.3 As part of the budget report the Chief Finance Officer should state: 
• the current value of general reserves, the movement proposed during the
year and the estimated year-end balance and the extent that balances are
being used to fund recurrent expenditure;
• the adequacy of general reserves in light of the IJB’s Strategic Plan, the
medium term financial outlook and the overall financial environment;
• an assessment of earmarked reserves and advice on appropriate levels and
movements during the year and over the medium term; and
• if the reserves held are under the prudential target, that the IJB should be
considering actions to meet the target through their budget process. 
236

Page 237

7. Accounting and Disclosure 
7.1  Expenditure should not be charged directly to any reserve. Any movement
within Revenue Reserves is accounted for as an appropriation and is
transparent. Entries within a reserve are specifically restricted to ‘contributions
to and from the revenue account’ with expenditure charged to the service
revenue account. 
237

Page 238

238

Page 239

Integration Joint Board
25th September 2025
Subject : Financial Inclusion Strategy 2025-30
Purpose : To provide an update on progress relating to the Financial
Inclusion Strategy 2023-28 and present an updated Strategy for
2025-30.
Recommendation : That the IJB notes the positive progress and approves the
Financial Inclusion Strategy for 2025-30 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required 
2. North Ayrshire Council X
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
FIO Financial Inclusion Officer 
1. EXECUTIVE SUMMARY 
1.1 Following a review of Financial Inclusion services in 2022, Money Matters and the
Welfare Reform Advice team came together to form a new Financial Inclusion service
within the HSCP. A new temporary Senior Manager (Financial Inclusion) post was
created to develop a Financial Inclusion Strategy for 2023-28 (approved by Cabinet in
March 23) and to lead on integrating the teams. The Senior Manager worked with the
Transformation Team and Project Board on systems development, review of practice
and processes and improving delivery models and established a Financial Inclusion
Partnership. A non-recurring budget to cover the costs of the temporary Senior
Manager post, contracting out debt advice services for two years and other costs
associated service developments was agreed by Cabinet in March 2023. 
1.2  Over the last two years our ambitions have been achieved. In December 2024, a
report was submitted to the Integration Joint Board detailing recommendations for
implementation by 1 May 2025 which were approved and have now been
implemented. These include the rebranding of the Financial Inclusion service as
Money Smart, the move of Money Matters from a universal service to one targeting
priority groups, a restructure of the team and the creation of an in-house debt advice
service for non-council tenants.  
Agenda Item 13
239

Page 240

AdvicePro, is now in use across the Money Smart team and a new Performance
Management and Quality Assurance Framework has been integrated with AdvicePro.
The Advice Line delivery model has been reviewed and a new, more client-centred
model introduced in May 25. 
The Financial Inclusion Partnership was established in May 2023 and is much valued
by the 21 member agencies for information sharing, learning and networking. 
1.4 A Financial Inclusion Strategy for 2025-30 has now been produced and is attached
with this report for the approval of the IJB. 
1.5 The Money Smart team continue to achieve significant financial gains for residents in
North Ayrshire with a total of £27.2m of financial gains reported for 2024-25. 
2. BACKGROUND 
2.1 As part of the Council’s Transformation Programme and in response to the Cost-of-
Living crisis, a review of Financial Inclusion services across the Council was
progressed during 2022. The outcomes included recommendations that a temporary
Senior Manager post be created and that Money Matters and the Welfare Reform
Advice Team (formerly in Housing Services) should form a new Financial Inclusion
team within the Health and Social Care Partnership. 
2.2 In January 2023, the new Senior Manager took up post. An interim Financial Inclusion
Strategy for 2023-28 was approved by Cabinet in March 2023, detailing key intentions
for 2023-24, and the new Financial Inclusion team was formed on 1 April 2023.
The Project had Chief Officer Sponsorship within the HSCP, recognising the
importance of ensuring the development of financial inclusion services, this was
progressed at pace 
2.3 The Senior Manager led on integrating the teams and worked with the Transformation
Team and Project Board to review and implement a new case management system
(CMS), whilst reviewing and implementing new, more efficient, processes and delivery
models and developing a Performance Management and Quality Assurance
Framework to be integrated in the new CMS. The Financial Inclusion strategy was
reviewed and updated following a public and stakeholder consultation process. 
3.  PROGRESS OF THE IMPLEMENTATION OF THE FINANCIAL INCLUSION
STRATEGY 2023-28 
3.1 The new North Ayrshire Financial Inclusion Partnership was established in May 2023
and now has representation from 21 different services or agencies. 
A working group was established to develop and deliver a community and stakeholder
consultation to inform a review and refresh of the Strategy. This was carried out in
October/November 2023 and the findings incorporated into the Strategy for 2025-30. 
240

Page 241

A Fuel Poverty sub-group was established in 2024 followed by a Communications
sub-group at the start of 2025 to take a joint approach to promotion of services and
the key issues impacting on our residents. The Partnership brought new opportunities
to improve partnership working and referral pathways and a review conducted at the
end of 2024 found that it is valued by members for information sharing, learning and
networking. 
A Partnership Action Plan has been developed and is incorporated into the Strategic
Ambitions for 2025-30. 
3.3 In 2024, as part of the ‘Accessing our Council’ initiative, Welfare Rights and Money
Advice was incorporated into the online Corporate Referral Pathway developed and
implemented by the Transformation Team, with pathways effectively established. 
From 1st May 2025 Money Smart calls were routed through the main council number
with both the Money Matters adviceline and Welfare Reform Team numbers being
phased out. A single point of contact has been developed for Money Smart calls,
emails and referral form. 
3.4 Following a technical appraisal carried out by the Transformation Team, AdvicePro, a
system designed by and for the advice sector and already in use by the Welfare
Reform Advice Team, was expanded to include Money Matters and went live on 30
September 2024. 
3.5 AdvicePro incorporates the new Performance Management and Quality Assurance
framework which supports a standardised approach to data capture and reporting, a
systematic approach to service development and to encourage a culture of continuous
improvement. 
3.6 A total of £753,000 was approved by Cabinet in March 2023 aligned to progressing
the strategy and the commissioning of debt advice services. The detail of the funding
sources is detailed below: 
Funding agreed Source
£258,000 Cost of Living budget
£380,000 Employability earmarked reserves (originally the
Better Off demonstrator budget)
£15,000 NAC ‘Islands Budget’ 
£100,000 Funding allocated as part of NAC budget 2023-24 (up
to £100k)
£753,000 TOTAL 
241

Page 242

Actual expenditure to 30 June 2025 is £633k with any remaining cost commitments
being within the £753k allocated by North Ayrshire Council with the remaining balance
being held in Council earmarked reserves.   
3.7 In December 2024, a report was submitted to the Integration Joint Board detailing
recommendations for implementation by 1 May 2025 which were approved and have
now been implemented. This includes: 
 A re-branding and re-launch of the Financial Inclusion team under the new name
of Money Smart
 The CHAP two-year contract to provide debt advice to non-council tenants came
to an end on 30 June 2025
 Debt Advice for non-council tenants has been added to the debt advice service
available to council tenants. This allows us to make debt advice available to non-
council housing tenants who approach the service for Welfare Rights advice but
also need help with debts
 The Money Matters delivery model has moved from a universal service to one
targeting priority groups. This includes referrals from HSCP/NHS/NAC and third
sector, and self-referrals from people who have disabilities or dependent children,
are pregnant or carers, or are from minority ethnic groups. These groups
represented around 82% of clients in 2024-25. 
 A restructure of the Financial Inclusion team, including management. The
restructure incorporated the removal of a number of posts through a VER process
and staff movement. 
3.8 Despite the move from a universal to a targeted service, referrals numbers have not
reduced, indicating that some non-priority groups are open to services. 
Referrals to date to the service are detailed below: 
Money Smart Referrals 25/26     
Total HSCP HRA
Apr 520 365 155
May 530 361 169
June 498 359 139
July 528 342 186 
Money Smart have received only 11 ineligible self-referrals since May 2025, of these,
individuals have either been referred on to other alternative providers and supports or
have been provided with advice only.   
Referrals continue to be managed by the recently integrated teams with the 
introduction of AdvicePro, implementation of our new delivery model, and adjustments
to the way that work is distributed having been designed to ensure continuity and
efficiency. While the workforce has been reduced, the new structure has been
242

Page 243

designed to streamline processes, eliminate duplication, and use digital technology to
assist with routine tasks. 
4. The Financial Inclusion Strategy and Ambitions for 2025-30 
4.1 The development of the strategy was informed by community and stakeholder
consultation as well as engagement with staff and key service leads including Child
Poverty, Community Wealth Building and Housing services. 
4.2 Economic Context – Recent data for 2023-24 confirms that child poverty in Scotland
has fallen from 26% to 22%, this is largely attributed to Scottish Government policy
interventions and contrasts with a wider upward trend across the rest of the UK.
However, ongoing welfare reforms continue to pose a significant risk of income loss
and the households most likely to experience high poverty rates often are those reliant
on benefits. North Ayrshire recorded the second highest rate of child poverty in
Scotland with 29.2% of children living in poverty (after housing costs). Across
Scotland, data for 2021-24 indicates that around 75% of children living in poverty were
in families where at least one parent was working.  There is evidence of a decline in
workers earning below the living wage in North Ayrshire between 2018-22,
demonstrating that employment does not necessarily guarantee a pathway out of
poverty for many families.  Poverty continues to be a significant challenge across
Scotland and particularly in North Ayrshire. 
4.3 Tackling Poverty – the role of Financial Inclusion services 
Unclaimed benefits across Britain were estimated to be around £23 billion in 2024,
this excludes unclaimed disability benefits and discretionary support which have not
yet been assessed (Poverty in Practice 2024). Benefits go unclaimed for many
reasons including a lack of awareness, an assumption of ineligibility, the complexity
of the welfare rights system, digital exclusion and stigma. Welfare Rights advice
services break down those barriers. 
Debt repayments are not deducted from income for the purposes of determining
whether a household is in income poverty. They do however reduce the level of
household disposable income and increase the risk of material deprivation. Debt
Advice services offer options for managing debt more effectively and in some cases,
debt can be reduced or written off. 
4.4 Demand for services 
1. The Money Smart welfare rights and debt advice service dedicated to council
tenants (formerly known as the Welfare Reform Advice Team) is funded through
the Housing Revenue Account through a Service Level Agreement for 2025-30
with Housing Services.  This service saw a significant increase in demand between
2023-24 and 2024-25, continuing the pattern of year on year increases for the last
five years. Demand included:
• A 28% increase in referrals to the Welfare Rights and Debt Advice service.
1889 referrals were received (self-referrals from tenants doubled) and 72% of
243

Page 244

these resulted in cases being allocated. Complex (multiple) debt cases also
increased.
• Referrals to the Financial Inclusion Officers (FIOs) through the DWP Landlord’s
Portal (managed by the service) for support with Universal Credit (UC) claims
increased from 2,140 to 2,334. FIOs also receive referrals from Housing
Services for ‘pre-tenancy checks’ for new tenants.  Officers can explain
changes to benefits arising from taking on a tenancy, provide support with
Universal Credit claims, provide advice on managing household budgets and
help tenants access grants/furnishings for their new home. Those referrals
halved in number during 2024-25 due largely to the increase in vacated council
properties being allocated to those who are homeless and who receive this
support from the Housing support team. However, this was a temporary
measure and referrals to the FIOs are anticipated to increase again during
2025-26.   
Financial Gains of £5.7m were secured in 2024-25 for council tenants, an increase of
50% on 2023-24. 
2. The Money Smart welfare rights service (formerly known as Money Matters and
which was open to all North Ayrshire residents in 2024-25) has maintained a high
level of referrals for the last five years with a total of 5,433 referrals across the
year. 44% were from HSCP/NHS and 45% were self-referrals (or from a family
member/friend). Around 70% engaged with the service and received advice and
support. 
811 of the referrals from HSCP were for financial assessments – 653 for non-
residential charging and 158 for kinship carers. Full breakdown of HSCP referrals
opposite. £21.5m in Financial Gains were achieved for 2024-25.   
244

Page 245

4.5 Funded projects 
• GP practices – Through this Scottish Government initiative launched in 2022,
funding has been granted to support the development and embedding of
welfare rights advisers in nine priority mainland GP practices, which was
extended in 2023 to include the island practices on Arran and Cumbrae. The
delivery model has proven effective and efficient with high levels of
engagement. Over £3m in financial gains was achieved last year (this is
included in the £21.5m above) for the 536 patients referred by Practice staff
(additional to the 5,433 referrals from other sources). 
• Schools – Through funding from Education services which started in October
2021, a named Adviser with a direct referral pathway was dedicated to
engaging parents through secondary schools and through increased funding,
last year three named advisers now incorporate primary schools and early
years centres. Last year a total of 259 parents with school age children
benefitted from this investment, through direct referrals from parents or schools
or from HSCP social work teams who referred direct to the project. £560,509
in financial gains was achieved for those parents, an increase of 46% on 2023-
24. (included in the £21.5m above)
• Foodbanks and Larders - Since April 2021, the Trussell Trust has been funding
advisers to support those who access foodbanks and larders. Initially this was
one adviser, but funding was expanded to add a second, and they now provide
services in 14 foodbanks and larders across North Ayrshire.  128
foodbank/larder users received welfare rights advice through this project in
2024-25 and an additional 76 referrals were received direct from the foodbanks. 
4.6 Feedback from a recent Money Smart beneficiary: 
“Thank you to everyone who supported me. They went over and
above to be extremely helpful, compassionate and understanding.  I
feel like [my case worker] has literally saved my life and given me
hope. She explained everything in such a calm and reassuring way
and has calmed me down so much. The process of dealing with DWP
has been very stressful and frightening as I have worked most of my
245

Page 246

life. She has given me a reason to live and that I am not hopeless by
treating me so kindly like a normal person. 
The huge problems that seemed impossible to face as I kept asking
for help and getting nowhere until [the team] changed my life for the
better are now being looked at. 
[My case worker] kept in contact and consistently been available and
kindly given her time and advice and also a lot of other helpful
information. Thanks to her I have been focussing on health,  eating
and sleeping properly and hopefully will be able to get a job in the
future. 
Thank you.  I cannot thank you and your staff enough”. 
4.7 Priorities and Ambitions to 2030 
• Early and Effective Support:
o Advisers within GP practices will be mainstreamed in the lead up to the
external funding ending.
o We will build on established referral pathways through named workers
within primary and secondary schools and early learning centres. 
o We will take referrals from Housing for tenants in, or at risk of being in rent
arrears
o We will continue co-location within key HSCP services 
o We will continue the Advice Line delivery model established in May 25,
through which ‘duty’ advisers answer calls at the point of contact. 
o We will continue to challenge stigma and fear as barriers to engagement
and raise awareness of all available advice and wider financial inclusion
services across North Ayrshire through the continuation of our Financial
Inclusion Partnership 
• Wellbeing – Enabling Communities:
o We will empower service users by pro-actively measuring customer
satisfaction and seeking customer feedback.  This will help us to identify
potential service improvements and inform the content of campaigns and
decision making
o We will build financial resilience through the provision of welfare rights and
debt advice services
o We will support new tenants to maximise their income and sustain their
tenancies
o We will continue to build on the holistic approach to identifying and actioning
wider and underlying issues to improve health and wellbeing
•  Tackling Inequalities through Community Wealth Building
o We will reach out to marginalised individuals within our communities to
improve accessibility and support engagement, in particular those in our
246

Page 247

island communities, minority ethnic groups and gypsy/traveller
communities. 
o We will gather evidence of the number of clients who, as a result of the
advice and support received, are more confident managing their household
budget and feel better prepared for unplanned and planned expenditures. 
• Develop and Support our Workforce
o Through the Performance Management and Quality Assurance framework
we will encourage and support a culture of continuous improvement and
enable the production of public performance reports which evidence the
totality of our work and outcomes achieved for our customers.
o We will Achieve accreditation to the Scottish National Standards for
Information and Advice Providers to evidence to funders and to the public,
of the high-quality services delivered by our team
o We will seek opportunities to use technology where appropriate, to deliver
more efficient and effective services and to maximise the use of resources 
Through the Financial Inclusion Partnership, we will continue to share information,
knowledge and learning to enhance all services. 
4.8 Anticipated Outcomes 
Through our strategic ambitions, Money Smart will contribute to the North Ayrshire
council ‘No Wrong Door’ approach to improving access to services and ultimately to
the aim of a sustained decrease in the number of people, and children in our
communities living in poverty. 
4.9 Measuring Impact 
Through our Performance Management and Quality Assurance Framework we will
produce public performance reports which evidence the totality of our work and the
outcomes achieved for people in our communities 
Through pro-actively measuring customer satisfaction we will evidence the value of
our work from the customer perspective. 
Through our new ‘exit forms’ sent through AdvicePro when cases are closed, we will
gather evidence of the extent to which the advice and support received by our teams
has resulted in clients being more confident in managing their household budgets and
feel better prepared for unplanned and planned expenditures.  This will provide an
indication of sustainable positive outcomes and impacts on child poverty. 
5. IMPLICATIONS 
5.1 Financial 
No direct financial impact for services, the report updates that the savings and
changes to the Money Smart team previously approved by the IJB have been
delivered in full.  The report also highlights that in 2024-25 financial gains of £27.2m
have been achieved for North Ayrshire residents by the Money Smart team. 
247

Page 248

5.2 Human Resources
“None”.
5.3 Legal 
“None”.
5.4 Equality/Socio-Economic
‘Financial inclusion’ refers to the ability of individuals to access appropriate financial
services or products to manage their money effectively, sustain their homes, build
savings for unplanned expenditures, be financially resilient, and more confident in
making informed life choices. 
Financial exclusion is closely linked with poverty and social exclusion and is a
significant contributor to child poverty. Poor financial wellbeing impacts on all aspects
of life and can leave lasting damage on future life chances. 
Financial inclusion services enable and empower people to access the information,
advice and support they need to maximise and effectively manage their disposable
income, to be less likely to fall behind with bills, more able to deal with unexpected
expenses, have improved mental and physical health and to become more active in
their communities. Ultimately, they enable people to have the knowledge, skills and
confidence to feel more secure and in control of their personal finances, both day to
day and when future planning. 
Our Financial Inclusion strategy sets out how in North Ayrshire we continue to seek to
improve our approach in partnership with wider partners through the Financial
Inclusion Partnership to better support and meet these needs for our residents. 
5.5 Risk
No risk factors
5.6 Community Wealth Building
The Financial Inclusion team supports the wellbeing economy by taking a people
centred approach to service delivery and developments to ensure that the service is
inclusive and people-centred. This includes the addition of the internal debt advice
resource to provide a seamless pathway to debt advice for people who seek welfare
rights but also require help with debts. The new delivery model and single point of
access for Money Smart will ensure that the service is inclusive, particularly for the
most vulnerable people in North Ayrshire communities. 
5.7 Key Priorities 
Aligns with our IJB Strategic Plan priorities including providing early and effective
support and addressing inequalities for our residents. 
6. CONSULTATION 
The Financial Inclusion Partnership developed and delivered a Community
Consultation late in 2023 to hear from our residents what they want from advice and
wider financial inclusion services and to help inform the development of this strategy.
A total of 177 responses were received from North Ayrshire residents, 57 of whom
248

Page 249

had accessed at least one advice service (44 had been to Money Matters, 7 to WRAT
and 7 to CHAP) 
Services were highly rated for accessibility, response times and communications. 80%
said they got more help than expected. 
15 stakeholder agencies/services were also consulted, and the responses reinforced
the positive views of advice services expressed by most of those who responded to
the community consultation. There were high levels of trust in the quality of services
and effective and efficient referral pathways and response times were valued. 
“You Said: We will”: 
Where both debt and welfare rights advice
was needed, accessing both through one
service is preferred
A Welfare Rights and Debt Adviser for non-council
tenants has been added to the service to ensure that all
those who access our services can receive both welfare
rights and debt advice without the need to refer to an
external provider. 
Engaging with the same person is
preferred when receiving advice and
support
The ‘named worker’ model has been expanded over the
last two years. 
Some respondents said they did not know
where to go for the help they needed or did
not think there are services for
homeowners.Stakeholders said that more
effective promotion is needed as people
they refer often do not know such services
exist. 
A Communications sub-group of the Financial Inclusion
Partnership has now been formed to take a cross-sector
approach to promoting services more effectively. 
The launch of Money Smart, with single points of contact
for all services will improve both accessibility and
awareness. 
Poor physical or mental health is a barrier
to accessing services
We will more effectively promote the range of options for
accessing services 
We need welfare rights advice on Arran.  We have developed more services for island communities
and will continue to seek options to improve accessibility
You want more help with form-filling for
claiming benefits
This has been reviewed and more support with form-filling
is now provided internally. 
Links with gypsy/traveller communities
need to be improved
We are now promoting our services through the Tenancy
Chat for Gypsy Travellers and seeking options to improve
engagement with those living in encampments. 
Stigma and fear of your situation getting
worse are barriers to engagement
This will be addressed through a Communications Plan
for 2025-26 
Caroline Cameron, Director
Author: Annie Johson, Principal Manager Business Support Services 
Appendices
Financial Inclusion Strategy 2025-30
249

Page 250

1 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
North Ayrshire 
Financial Inclusion
Strategy 
2025-30 
250

Page 251

2 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Contents
1. Introduction............................................................................................... 3
2. Alignment with HSCP Strategic Ambitions ............................................... 4
2.1 Enable Communities..................................................................... 4
2.2 Develop and support our Workforce ............................................. 4
2.3 Provide Early and Effective support .............................................. 4
2.4 Improve Health and Wellbeing ...................................................... 4
2.5 Tackle inequalities ........................................................................ 4
3. Our Interim Plan 2023-25 ......................................................................... 5
4. Economic context ..................................................................................... 7
5. Tackling Poverty – The Role of Financial Inclusion.................................. 8
5.1 Income from Social Security - the ‘take-up’ of social security
entitlements ........................................................................................ 9
5.2 Costs of living – Fuel Poverty ..................................................... 10
5.3 Costs of Living - Unmanageable debt ......................................... 11
5.4 Costs of Living - Access to affordable credit and savings .......... 11
5.5 The Poverty Premium in North Ayrshire ..................................... 11
6. Advice Services in North Ayrshire .......................................................... 12
6.1 HSCP Financial Inclusion ........................................................... 12
6.1.1 The Welfare Reform Advice Team ................................. 12
6.1.3 Money Smart .................................................................. 16
6.2   CHAP ........................................................................................ 17
6.3 1st Alliance Community Bank – Progressive Finance ................ 17
6.4 Lemon Aid .................................................................................. 18
7. Developing the Plan for 2025-30 ............................................... 19
8. Vision, Mission and Core Values ............................................... 20
9. Money Smart Priorities and Ambitions to 2030 .......................... 22
Contact Information for Advice and Financial Inclusion Services ..... 25
Links ................................................................................................. 26
References ....................................................................................... 26 
251

Page 252

3 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
1. Introduction
‘Financial inclusion’ refers to the ability of individuals to access appropriate financial
services or products to manage their money effectively, sustain their homes, build
savings for unplanned expenditures, be financially resilient, and more confident in
making informed life choices. 
Financial exclusion is closely linked with poverty and social exclusion and is a significant
contributor to child poverty. Poor financial wellbeing impacts on all aspects of life and can
leave lasting damage on future life chances. 
Low-income households are most at risk from the cost-of-living crisis, and people with
disabilities, lone-parent households, carers and people from minority ethnic backgrounds
are the most financially vulnerable. They are less likely to have savings that would cover
their outgoings for more than a month should they lose their job and are most likely to
have unmanageable debt. 
There is also a gendered dimension to the cost-of-living crisis. Women are more likely to
live in lone-parent households (92%), as well as in households with an unpaid carer and
larger households and can be more exposed to cost of living pressures. 
Financial inclusion services enable and empower people to access the information,
advice and support they need to maximise and effectively manage their disposable
income, to be less likely to fall behind with bills, more able to deal with unexpected
expenses, have improved mental and physical health and to become more active in their
communities. Ultimately, they enable people to have the knowledge, skills and
confidence to feel more secure and in control of their personal finances, both day to day
and when future planning. 
A financially healthy North Ayrshire is not only beneficial for individuals, but also for their
families, communities, businesses and the economy. 
North Ayrshire Council and the Health and Social Care Partnership take pride in a
co-production approach to strategic planning, through having meaningful conversations
with people in our communities. Engagement with the public, service users, staff and key
stakeholders was progressed in the second half of 2023, responses from which have
informed the development of this Plan. 
The Financial Inclusion Strategy is closely aligned with North Ayrshire Council’s
strategic aim to  
“Transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people” 
A wellbeing economy is one that delivers fair distribution of wealth and opportunities
within a healthy environment. 
The vision of North Ayrshire Council is for a North Ayrshire that is ‘Fair for All’ with
a Mission of  
“Working Together to improve the lives of our people in North Ayrshire” 
252

Page 253

4 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
2. Alignment with HSCP Strategic Ambitions 
The NAHSCP Vision is 
“People who live in North Ayrshire are able to have a safe, healthy and active life” 
Overview of Financial Inclusion alignment to HSCP strategic ambitions: 
2.1 Enable Communities
Financial Inclusion services build knowledge
and confidence to enable people in our
communities to navigate the welfare rights
system and manage household budgets
effectively forming the foundations for
sustainable outcomes that will reduce the
likelihood of clients facing financial crises in
the future. 
2.2 Develop and support our Workforce
Financial Inclusion services continue to face
significant challenges in responding to ever-
increasing demand, the changing
demographic of people seeking advice and
support, particularly for debt advice, and the
increasing complexity of the welfare rights
system with ongoing welfare reforms.   
We recognise the strain that this puts on our
staff but ensure that time is set aside for
regular training and learning activities that
are essential to maintain a high level of
expertise, that effective and regular support
and supervision is routinely carried out and
that wellbeing supports are widely promoted
and taken up when appropriate. 
We recognise that many North Ayrshire
residents are members of our own
workforce and that they can also require
advice and support from our services. 
2.3 Provide Early and Effective support
Financial inclusion services will continue to
work with the most vulnerable people in our
communities, providing early interventions to
reduce likelihood of a financial crisis
situation developing.
We aim to ensure that those most at risk of
financial crisis, or living in poverty have ease
- and equity - of access to advice and
related services so they can receive the
right support at the right time, in the best
way for them. 
2.4 Improve Health and Wellbeing
We recognise that in this ongoing cost-of-
living crisis, many people are experiencing
worry, anxiety, or depression relating to their
financial situation. 
The main focus of financial Inclusion
services is to maximise income and help
with managing debt, but it is also well-
evidenced that by removing money worries,
physical health and mental wellbeing
improve 
The free advice sector has an important role
to play in ensuring vulnerable people have
access to advisers with the expertise and
skills to effectively support and advise on
welfare rights and debt, whilst having
established referral pathways to health and
wellbeing services 
2.5 Tackle inequalities 
The ongoing cost-of-living crisis has further
highlighted the negative impact of
deprivation and poverty on our communities,
and we will continue to work collaboratively
with other service providers to deliver
shared solutions. 
We recognise those most vulnerable to the
253

Page 254

5 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
increasing costs-of-living  are people living
on low incomes, in particular lone-parent
households,  people with disabilities and
those from minority ethic groups. 
We will build on our holistic approach to
providing advice including co-location with
other services to proactively support those
who are hardest to reach in our
communities. 
3. Our Interim Plan 2023-25 
Out interim Strategy was published in April 2023 and a summary of achievements against
our priorities is set out below. 
Review, develop and improve North Ayrshire Advice Services to ensure they are
responsive to the needs of all local residents, and particularly those most vulnerable: 
• In April 2023, Money Matters and the Welfare Reform Advice Team, previously part of
Housing Services, came together to form the new Financial Inclusion Service within the
North Ayrshire Health and Social Care Partnership 
• Processes, procedures and systems have been standardised and streamlined to improve
efficiency and to ensure the most effective use of resources. 
• A new Performance Management and Quality Assurance Framework has been
integrated with our case management system to ensure a systematic approach to
service development and improvement, service user participation and to encourage a
culture of continuous improvement
• From 1 May 2025, Money Matters services moved from a universal service to a service
targeting those most vulnerable, and most likely to be living in, or at risk of poverty.
People referred by HSCP, NHS or other services, along with people who have disabilities
or dependent children, are carers, pregnant or from black or minority ethnic groups, will
continue to have access to our services (circa 82% of clients in 2024-25). 
Provision of universal debt advice services 
A new universal debt advice services was contracted through CHAP and commenced on 1
July 2023. This contract will end on 30 June 2025. However, a debt advice service will be
added to the team, to ensure debt advice is available in-house for non-council tenants who
seek welfare rights advice but also need help with debts.   
Improved referral pathways
The review of Financial Inclusion services was a key workstream within the North Ayrshire
Council Transformation Programme to improve access to services. Referral pathways to
welfare rights and debt advice services have been incorporated into the new online corporate
referral pathway, and calls are now routed through the main Council contact centre telephone
line.   
On 1 May 2025, the financial inclusion service was
rebranded and relaunched as Money Smart, with a single
Money Smart email address for referrals to both Money
Matters and the Welfare Reform Advice team. 
254

Page 255

6 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Establish a North Ayrshire Financial Inclusion Partnership
The Partnership was established in May 2023 and currently has representation from  21
different services or agencies. Fuel Poverty and Communications sub-groups have now been
established to support a joint approach to promotion of services across North Ayrshire. The
Partnership has brought new opportunities to improve partnership working, referral pathways
and joint working as detailed later in this strategy. A review conducted in 2024 found that
members valued the Partnership for information sharing, learning and networking. 
A Partnership action plan has been developed and has been incorporated into the Strategic
Ambitions for 2025-30 in Section 10
255

Page 256

7 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
4. Economic context  
Poverty continues to be a significant challenge across Scotland, with over a million people
experiencing its effects. Households most likely to experience high poverty rates are often
those reliant on benefits, which constitute a larger proportion of their income. 
Scottish Government data from 2021-24 also shows that child poverty is highest in families
with three or more children, in minority ethnic households, lone parent families, households
with a child under one year or where there is a disabled family member.  
In the wider population, the Joseph Rowntree Foundation reported in 2024 that 26% of
informal carers and 34% of people in families where someone is in receipt of carers’
allowance are also living in poverty in Scotland. Across the UK, in 2022-23, 30% of people
with disabilities were living in poverty. 
However recent data for 2023-24 has confirmed that child poverty in Scotland is falling, with
the relative child poverty rate (before housing costs) decreasing from 26% to 22%. This
positive trend is largely attributed to Scottish Government policy interventions, particularly
the Scottish Child Payment, and contrasts with a wider upward trend in child poverty across
the rest of the UK. However, wider UK government welfare reforms, as highlighted by
organisations like the Resolution Foundation and CPAG, and the cost of living, continue to
pose a significant risk of income loss for households. 
North Ayrshire faces distinct economic challenges and has a higher proportion of its
population experiencing deprivation compared to the Scottish average. The Scottish Index of
Multiple Deprivation (SIMD) 2020 identified North Ayrshire as having the third highest
proportion of data zones within the 20% most deprived areas in Scotland, with 40.9% of its
data zones falling into this category (up from 33 in 2004). Of the 186 SIMD data-zones in
North Ayrshire, 52 (28%) are in the 15% most deprived areas in Scotland.   
A notable shift within the area is that the Irvine locality now has the highest proportion of
data zones in the 15% most deprived in Scotland, having overtaken the Three Towns locality
(Ardrossan, Stevenston, and Saltcoats), which previously held this position until 2012. 
As a result of the Covid-19 epidemic, the 2024 SIMD update has been delayed until 2026.
The strategy will be updated to reflect any significant changes in the data thereafter. 
Child Poverty in North Ayrshire 
In 2022/23, North Ayrshire recorded the second highest rate of child poverty in Scotland,
with 29.2% of children living in poverty (after housing costs). This means that over 7,000
children and young people in our area may be struggling to access everyday essentials such
as food, clothing, and transport. This figure compared at the time to a national average of
23% in Scotland, highlighting the persistent local challenge and its direct implications for
child health and wellbeing. Note: most recent after housing costs data is expected from
Loughborough University in June, 2025 
Across Scotland, the latest data for 2021-24 indicates that approximately three-quarters
(75%) of children living in poverty were in families where at least one adult was
working.  Nationally in 2024, 11.4% of employee jobs in Scotland were paid below the Living
Wage. Whilst data specifically for North Ayrshire post-2022 is less readily available, we have
been able to evidence a decline in workers earning below living wage in the region between
2018-2022. This information demonstrates to us that employment does not necessarily
guarantee a pathway out of poverty for many families. 
256

Page 257

8 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Our People’s Panel Survey indicated a concerning trend in 2018: that the percentage of
adults in North Ayrshire managing well financially was reducing, and the number of adults
with no savings was increasing, in slight contrast to Scotland as a whole. More recent local
survey insights from 2022/23 highlighted that 26% of North Ayrshire respondents rarely or
never have money left to save, and 18% have unsecured debt exceeding one month's
income. Furthermore, 6% reported not managing very well or experiencing financial
difficulties. 
5. Tackling Poverty – The Role of Financial Inclusion   
The need for specialist financial inclusion support services has never been
greater. 
Universal Credit is complex, and UC claims can impact on other benefits. The
ongoing migration to UC from DWP legacy benefits and the additional, or
devolved benefits now provided by Social Security Scotland make it challenging
for many people to navigate the welfare rights system without the support of a
specialist welfare rights adviser. The requirement to apply and maintain UC claims
online is an additional barrier for many. DWP research suggests that 45% of
benefit claimants lack the digital skills to make and maintain their claims. 
Money Advice Scotland reported in March 2024 that there has been a ‘surge’ in
unsecured personal debt, with an increase in energy debt and council tax debt.
Bankruptcies are up by 3%. 
Stepchange reported in April 2023, that levels of debt on household bills
increased in Scotland by 68% between 2021 and 2022 and sat at an average of
£2,929. The Money and Pensions Service reported that 700,000 people in
Scotland are at risk of, or in problem debt, only 54% save regularly and 15%
borrow to pay for food or bills. 
Money and Pensions Service research reported in November 2023 that there has
been a deepening vulnerability and complexity, more intensive cases, and ‘never
been in debt before’ middle income homeowners accessing debt advice services.  
257

Page 258

9 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Direct drivers of poverty (Scottish Government) 
The direct drivers of poverty fall into three main categories – income from
employment, costs of living and income from social security. Financial Inclusion
services have a role in addressing costs of living and income from social security. 
5.1 Income from Social Security - the ‘take-up’ of social security
entitlements 
Unclaimed benefits across Britain were estimated to be around £23 billion in 2024,
excluding unclaimed disability benefits and discretionary support which have not yet
been assessed. It is estimated that the total unclaimed support is likely to be over
£30bn when those elements are included (Poverty in Practice 2024). 
258

Page 259

10 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
The reasons for benefits going unclaimed include lack of awareness of the existence
of some benefits, or assumptions that they would not be eligible, the complexity of
the system, digital exclusion and stigma. 
Welfare rights advice services break down those barriers. They enable people to
better understand and claim their entitlements to maximise their income. Increasing
benefits take-up and ensuring citizens are in receipt of their legal entitlements has a
positive impact for North Ayrshire residents and also for the local economy. 
5.2 Costs of living – Fuel Poverty 
The Scottish Government reported in 2023 that that an estimated 31% of Scottish
households were living in fuel poverty (spending more than 10% of their income, after
housing costs, on energy) and around 19% were in extreme fuel poverty (more than
20%). People are more likely to be in, or to fall into fuel poverty if they have an
ongoing heath condition which requires higher than average fuel consumption, have
a low income, live in the social rental sector, in a home off the gas grid, in a rural
area, or where electricity is their primary heating fuel. 
There are significant differences across the six North Ayrshire localities with the
North Coast/Cumbrae and Arran generally having less people living in poverty,
claiming benefits and lower health inequalities. The one exception is fuel poverty
where the average for mainland localities is 27% but 41% on the island of Arran,
where import costs and lack of access to the grid mean fuel is more expensive for
Arran residents. 
Lemon Aid are a specialist social enterprise and member of the North Ayrshire
Financial Inclusion Partnership with established referral pathways from advice
services for help with energy costs, problems with meters, arrears on energy bills and
259

Page 260

11 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
disputes with suppliers. 
5.3 Costs of Living - Unmanageable debt 
Debt repayments are not deducted from income for the purposes of determining
whether a
household is in income poverty. They do, however, reduce the amount of
disposable income that households have to spend on goods and services, and
therefore increase their risk of material deprivation, ie unable to afford goods and
activities that are the norm in today’s society. 
Debt advice services offered by Money Smart and CHAP options for managing debt
more effectively and support to put in place debt solutions. In some cases,
depending on the circumstances, debt can be reduced or written off.   
5.4 Costs of Living - Access to affordable credit and savings 
As a result of low income, income only from benefits,  or poor credit rating many
people are unable to borrow money from the same sources as other members of
the population.
Many, as a result, turn to high-cost alternatives such as doorstep or payday lenders.
Credit can therefore be the most expensive for those who can least afford it.
Access to affordable credit and savings can protect against problem debt and
material deprivation as they safeguard against unplanned costs and changes in
income.
Credit Unions/Community Banks are key providers of financial inclusion services.
The 1st Alliance Community Bank, based in Kilwinning, is another key member of
the North Ayrshire Financial Inclusion Partnership. 
5.5 The Poverty Premium in North Ayrshire 
The poverty premium is the extra cost people on low incomes and in poverty pay for
essential products and services:
• Payments – Some payment methods create a poverty If they do not have a bank
account they have no access to direct debts, often a cheaper way to pay bills.
Paying things like insurance monthly rather than all in one go annually can cost
more. 
• Energy – Paying bills as they arise costs an extra £106 (Jan-Mar 2024)
compared to using direct debit. 
• Credit – people in poverty pay more to borrow money because they are more
likely to have a low credit score and be ore of a risk to lend to. 
• Insurances provide protection from financial loss and give peace of mind. Low-
income households often cannot afford insurance but when they do, often face
additional costs. Car insurance for those in less affluent areas can cost £314 pa
more than in more affluent areas. 
260

Page 261

12 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
The total cost of the poverty
premium in North Ayrshire is
£4,888,380 with 23.3% of
households experiencing any
premium. The average cost
to N Ayrshire households
is £468. 
(Fair by Design 2024) 
6. Advice Services in North Ayrshire 
In comparison with many other local authorities, North Ayrshire has relatively
few local providers of advice and wider financial inclusion services, but they are
well-established and much valued in our communities. The North Ayrshire
Financial Inclusion Partnership, established in May 2023, with representation
from both advice services and key stakeholders, work together to share best
practice and learning and to improve awareness of services and understanding
of the needs of vulnerable people in our communities. 
6.1 HSCP Financial Inclusion 
In April 2023, Money Matters and the Welfare Reform Advice team (formerly in
Housing services) came together to form a new Financial Inclusion service
within the North Ayrshire Health and Social Care Partnership. 
6.1.1 The Welfare Reform Advice Team,
Funded through the Housing Revenue account, provides services for council
tenants through a close working partnership with North Ayrshire Council
Housing services. They are based within Saltcoats Housing Office. The team
includes Welfare Rights and Debt Advisers and Financial Inclusion Officers. 
In 2024-25 the team received a total of 4740 referrals.1899 referrals were for
Welfare Rights and Debt Advice (WRDA), an increase of 28% on 2023-24 with
self-referrals being double the previous year.  72% of those referrals resulted in
welfare rights and/or debt cases being allocated. Of the remaining 28%, most
received initial advice and/or information. 
£422,522
£755,811
£1,658,213
£974,153
£455,956
£561,598 Prepayment meter
premium
Non-standard billing
premium
Non-switching premium
Area-based insurance
premium
Single item insurance
premiums
261

Page 262

13 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
‘Internal’ referrals to the Welfare Rights and Debt Advisers were from Money
Matters (mostly for debt advice) or from the Financial Inclusion Officers for the
more complex welfare rights cases.  
2334 referrals were to the Financial Inclusion Officers (FIOs), through the DWP’s
Landlords portal, for support with UC claims or from Housing services for pre-
tenancy checks, through which FIOs explain changes to benefits arising from
taking on a tenancy, provide support with UC claims, managing household budgets
and to access grants/ furnishings for their new home. The number of pre-tenancy
checks has halved in number from 2023-24, due largely to the increase in vacated
council properties being allocated to those who are homeless, who receive this
support from Housing’s tenancy support team. 
The Welfare Reform Advice Team secured a total of £5.7m in financial gains for
tenants through income maximisation (£5.6m) and debt reduction (£96k). An
increase of 50% on 23-24.
98.5% rated services as ‘very satisfied’ in 2024-25. Feedback from one Welfare
Reform Advice team client below: 
“I found [my case worker[ was very helpful. She explained things in a way could
understand and she helped by relieving my anxiety and worries over my
problems. She was very empathetic and understanding, an absolute asset to
your Team” 
6.1.2 Money Matters core funding is from the Health and Social Care Partnership
and until 30 April 2025, they provided a universal welfare rights advice for all North
Ayrshire residents. They have been embedded within the Health and Social Care
Partnership services for a number of years, including named workers who co-locate
within Community Justice, Children & Families, and Addictions services. 
815
524 448
112
697
247
380
165
0
200
400
600
800
1000
Housing
services
Self
referrals
Internal Other
Referrals for Welfare Rights
and Debt Advice
24-25 23-24
2334
507
2140
1090
0
500
1000
1500
2000
2500
DWP Portal - UC
support
Housing Services -
Pre-tenancy
checks
Referrals to Financial
Inclusion
2024-25 2023-24
262

Page 263

14 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
In 2024-25, Money Matters
received 5433  referrals,
maintaining a similar level
over the last five years. 44% 
were from HSCP/NHS and
45% were self-referrals or
from a family member/friend. 
Around 70% engaged with
the service and received
advice and support 
Of the
HSCP/NHS
referrals, 811
were for
financial
assessments,
653 for non-
residential
social care
charging
services and
158 for kinship
carers. 
A total of £21.5m in Financial Gains was achieved for their clients, through maximising
income.   
Note: Due to changing to a new case management system in October 2024, these
figures may be lower than actual totals. 
Money Matters Funded Projects 
GP practices – through the Welfare Advice and Health Partnerships Scottish
Government initiative launched in 2022, Money Matters has received funding to
support the development and embedding of welfare rights advice in nine priority
mainland GP practices, extended at the end of 2023 to include the islands of Arran
and Cumbrae. Three Welfare Rights Officers work from the GP practices, where
welfare rights appointments are input to the GP patient information system by
practice staff and where advisers can access medical information to inform and
HSCP/NHS,
44%, 44%Self or
family/friend,
45%, 45%
Other, 11%,
Referral sources
0 100 200 300 400 500 600 700
Macmillan
Service access
Addictions
Children & Families
Justice Services
Mental Health
NHS
Non-residential Charging
Kinship Care
HSCP/NHS referrals
263

Page 264

15 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
support casework.  The delivery model is very efficient, engagement is high and over
£3m in financial gains (included in the total financial gains of £21.5m above) was
secured for the  536 patients referred in 2024-25. 
“I honestly can thank you enough for all your help and support with sorting [all
my my claims] out for my family, it’s put me in a far better financial position
now, all thanks to you. I really appreciate everything you have done, thanks
again” (GP practice client feedback) 
North Ayrshire Schools – through funding from Education services which started
in October 2021, Welfare Rights Officers have been attached to North Ayrshire
secondary schools, initially one adviser covering secondary schools and since
2024-25, three advisers to incorporate primary schools and early years centres.
Referral pathways direct to those named workers are promoted through school
activities/communication channels and the number of referrals from parents with
school-age children has increased through this initiative. In 2024-25, a total of 259
parents with school age children benefitted from this initiative – through direct
referrals from parents, referrals from schools or HSCP social work teams who
referred direct to the project. This represents a 144% increase on the number of
referrals in 2023-24. A total of £560,509 in financial gains was achieved for those
parents in 2024-25 (an increase of 46%) – included in the £21.5m total above. 
“Thanks so much for all your help, time and patience, I really appreciate it. You
have improved mine and my kids lives so much, I will be forever grateful”
(Parent feedback, Schools project) 
North Ayrshire Foodbanks and Larders – since April 2021, the Trussell Trust has
been funding advisers to support those who access foodbanks and larders. Initially
this was one adviser but funding was expanded to add a second, and they now
provide services in 14 foodbanks and larders across North Ayrshire. In 2025 they
aim to expand this to include Largs, Millport and Springside.  128 foodbank/larder
users received welfare rights advice through this project in 2024-25 and an
additional 76 referrals were received direct from the foodbanks. 
Summary of referrals to Money Matters and the Welfare Reform Advice Team
2024-25 (excluding the projects above). 
0 1000 2000 3000 4000 5000 6000 7000
Money Matters - WR
WRAT - WR & Debt
WRAT - FIOs Pre-Tenancy Checks
WRAT - FIOs UC Claims
2024-25 2023-24
264

Page 265

16 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Child Poverty Outcomes 
The Financial Gains for North Ayrshire residents who engage with our services are
substantial and have been increasing year on year for some time. Our beneficiaries
have had their income maximised and many have had their debt reduced and
affordable repayment plans put in place. North Ayrshire Council tenants are also
supported to manage their household budget and furnish their homes.
Most clients will have improved financial circumstances, and being unburdened of
money worries, their mental health and wellbeing improved. 
In 2025, we will start pro-actively seeking client feedback on wider outcomes,
through asking them to complete a brief survey when their case is closed which
includes the following two questions which provide an indication of impact of our
services on child poverty: 
Do you, as a result of advice and support received, feel more confident
managing your household budget and in your ability to pay your bills? 
Do you, as a result of advice and support received, feel financially more
prepared for an unplanned expenditure or unexpected event? 
The first report from this activity will be for 2025-26 and responses will further
evidence the impact of advice services in relation to the related child poverty
indicators. 
6.1.3 Money Smart   
On 1 May 2025, the integration of the two
internal teams into one cohesive Financial
Inclusion Service was reinforced through the
rebranding and relaunch of the service as
Money Smart. Going forward the Money Matters and Welfare Reform Advice Team
names will be dropped and the service referred to as Money Smart.   
This change alongside the now fully integrated service will maximise the use of all
resources with staff across the service working with one case management system
which will support more effective joint working to meet the needs of people in our
communities. It will also improve accessibility with: 
• A Single point of contact for all services – one email address, one telephone
number and one online ‘contact us’ form. 
• Phone lines staffed by advisers from across the Money Smart service, taking
calls at point of need
• Welfare Rights and Debt Advice both available for all council tenants, and for
other vulnerable residents who are referred by services, are disabled, parents,
pregnant, carers of from minority ethnic groups. 
265

Page 266

17 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
6.2   CHAP
Based in Ardrossan, CHAP is a well-established charitable organisation that
provides welfare rights, money/debt and independent housing advice for people
across North Ayrshire.  CHAP has been contracted by North Ayrshire Health and
Social Care Partnership since July 2023 to provide debt advice services for North
Ayrshire residents. This contract was for two years to meet a gap in debt advice
when the Better Off programme ended. In the first year of this contract, CHAP
received 440 referrals for debt advice. 225 engaged with the service and by the end
of year one, 121 had debt strategies in place, exceeding the agreed performance
targets. 
Customer satisfaction ratings were excellent and feedback from one client is below. 
"Everything was spot on, the help you gave me was phenomenal. They were so
nice. Can’t thank you enough. I got awarded my ADP which I didn't even know
if I would get it, I didn't know I was entitled to it, grateful for them doing that for
me. My repairs and all that are being done now and I set up a payment plan". 
Following a review, it was decided in November 2024 that as a significant number of
referrals to CHAP were from Money Matters (28%), the contract with CHAP would
not be extended beyond June 2025, but a debt advice service for non-council
tenants would be added to the Money Smart team to provide in-house debt advice
for those who access welfare rights advice but also need help with debts and thus
eliminate the need to refer to an external agency for this service. It is recognised
that many people make a conscious choice to seek advice from CHAP and they are
actively seeking alternative sources of funding to enable them to continue to provide
this service. 
CHAP also provide advice and support for homeowners facing threat of
repossession through a partnership with Govan Law Centre, and through funding
from Housing services, provide advocacy and representation services for council
tenants facing eviction. 
6.3 1st Alliance Community Bank – Progressive Finance
In November 2021, North Ayrshire Council Cabinet approved a £150k investment in
1st Alliance Community Bank to enable lending of small loans to those who are of
higher credit risk and who would not normally quality through typical lending rules,
but who can afford repayments. A priority was to assist people to move away from
high-cost lenders e.g. doorstep lenders, buy now pay later’ and high-cost
catalogues and improve access to affordable, and ethical lending.   As per the
Credit Union saving/borrowing model, residents who access small loans through
this investment would also become savers (a minimum of £3/week) – a requirement
to access loans. As each loan is paid off, the borrower could then move onto a
members’-based loan which has a lower interest rate.  In November 2022, a £25
one-off incentive for new savers was incorporated into the SLA (from the original
£150k investment) to encourage residents to become more financially resilient
through developing a ‘saving habit’ and build a new savings pot which provides
266

Page 267

18 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
some security for both unplanned and planned expenditures such as Christmas. By
becoming regular savers, they would also then become eligible to access affordable
credit through 1st Alliance members-based loans when required. In September 2024
it was further agreed that the £150k investment could be used to fund staff time to
support the ‘unbanked’ to open mainstream bank accounts. The longer-term
intention was that as loans were repaid, the £150k investment would be recycled to
create a legacy fund for other high-risk borrowers. 
By March 2025, when the SLA ended, the £150k investment had enabled 338
residents who were higher-risk borrowers to access loans totaling £286,429
(including first and subsequent ‘members’-based loans).  £231,033 had been
repaid, thus creating the anticipated legacy fund which will enable continued access
to credit for higher-risk borrowers. 
This initiative has evidenced that higher-risk borrowers can also be ‘responsible’
borrowers through a) an arrears rate of 5% which was lower than anticipated and b)
that 56% applied and were approved for ‘member’s based’ loans after paying off
their initial loan. 
Residents who accessed loans through this investment have built a total of £84,615
in new savings, illustrating that people on low incomes can develop a savings habit
(32% were unemployed or on disability benefits and 11% were part-time workers) 
In addition, the £25 one-off incentive to open a savings account has generated 252
new savers and 78 have been supported to open mainstream bank accounts. 
6.4 Lemon Aid 
Lemon Aid is a social enterprise helping domestic energy consumers to save on
their energy costs. They are currently funded to provide support to North Ayrshire
Health and Social Care services through Energy Action Scotland. 
In 2024-25 they provided advice and support to 4528 North Ayrshire residents
including 763 people who were ‘reconnected’ to their power supply after having
‘self-disconnected’ – more than double the number in the previous year. Self-
disconnection arising from: 
“Debt amassed due to in-ability to pay is moved to the ‘back screen’ of the meter by
the supplier which results in a debt recovery rate being applied. This rate can be
high and forces consumers to go without power or heating as they can’t afford to top
up the meter, meantime their standing charge keeps increasing the debt level.”
(Lemon Aid)
Lemon Aid services include advice and support with debts to utility providers
including support to access discretionary grants to write off energy debts, or to set
up repayment plans. They also provide advice and support in resolving disputes
with suppliers and with the replacement of prepayment meters with credit meters. 
In 2024-25 they achieved over £257,245 in financial gains through energy debt
reduction. 
Referral pathways are in place from advice services to Citrus Energy for this
specialist service and last year 141 clients were referred from our Money Smart
267

Page 268

19 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
teams to Citrus for help with energy costs and debt to energy suppliers. 
7. Developing the Plan for 2025-30 
The Financial Inclusion Partnership developed and delivered a Community
Consultation late in 2023 to hear from our residents what they want from advice and
wider financial inclusion services and to help inform the development of this
strategy. A total of 177 responses were received from North Ayrshire residents, 57
of whom had accessed at least one advice service (44 had been to Money Matters,
7 to WRAT and 7 to CHAP) 
Services were highly rated for accessibility, response times and communications.
80% said they got more help than expected. 
“Money Matters came to my house, was able to complete my benefits applications
in privacy and at my pace, I can become overwhelmed when presented with a list of
questions. She explained everything and also advised of other financial help and
support available to me while waiting. Nothing was too much trouble”. 
15 stakeholder agencies/services were also consulted and the responses reinforced
the positive views of advice services expressed by most of those who responded to
the community consultation. There were high levels of trust in the quality of services
and effective and efficient referral pathways and response times were valued. 
“Very knowledgeable and extremely helpful – great partnership working. Gold
standard” 
You Said: We will: 
Where both debt and welfare rights
advice was needed, accessing
both through one service is
preferred
A Welfare Rights and Debt Adviser for
non-council tenants has been added to
the service to ensure that all those who
access our services can receive both
welfare rights and debt advice without
the need to refer to an external
provider. 
Engaging with the same person is
preferred when receiving advice
and support
The ‘named worker’ model has been
expanded over the last two years. 
Some respondents said they did
not know where to go for the help
they needed or did not think there
are services for homeowners.
Stakeholders said that more
effective promotion is needed as
people they refer often do not know
such services exist. 
A Communications sub-group of the
Financial Inclusion Partnership has now
been formed to take a cross-sector
approach to promoting services more
effectively. 
The launch of HSCP services as Money
Smart, with single points of contact for
both Money Matters and the Welfare
Reform Advice Team will improve both
accessibility and awareness. 
Poor physical or mental health is a We will more effectively promote the
268

Page 269

20 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
barrier to accessing services range of options for accessing services 
We need welfare rights advice on
Arran. 
We have developed more services for
island communities and will continue to
seek options to improve accessibility
You want more help with form-
filling for claiming benefits
This has been reviewed and more
support with form-filling is now provided
internally. 
Links with gypsy/traveller
communities need to be improved
We are now promoting our services
through the Tenancy Chat for Gypsy
Travellers and seeking options to
improve engagement with those living
in encampments. 
You also told us that stigma, and fear of your situation getting worse are barriers to
engagement. This will be addressed through a Communications Plan for 2025-26. 
8. Vision, Mission and Core Values 
Our shared vision is for 
A financially healthy North Ayrshire where people have the knowledge,
skills, resources and confidence to manage their money effectively and
live fulfilling and healthy lives. 
Our shared mission is to:
“Provide accessible, professional advice services that work together
and in partnership with related services, to ensure that all the needs of
our customers are met” 
269

Page 270

21 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Our Core Values:
As part of our engagement in developing this plan, we asked local people, and our
staff teams, to tell us what values they would expect from, and what they value in
our services. They told us they expect us to embody: 
CARE – EMPATHY – RESPECT 
Care
People are at the heart of everything we do, and we are passionate
about making a real difference in their lives. We provide a quality service
from advisers who are knowledgeable and highly skilled in their field. 
Empathy
By actively listening and establishing trusting relationships, we gain an
understanding of individual needs and respond to our clients at their own
pace and as appropriate to their circumstances. 
Respect
We see people who access our service as unique individuals and active
participants improving their financial circumstances and quality of life.
We respond quickly to enquiries and keep you informed throughout your
journey with us. You will always be treated with dignity and respect from
a service which is inclusive and designed around the needs of our
clients. 
Feedback from a beneficiary of Money Smart services 
“Thank you to everyone who supported me. They went over and above to be extremely
helpful, compassionate and understanding. 
I feel like [my case worker] has literally saved my life and given me hope. She  explained
everything in such a calm and reassuring way and has calmed me down so much. The
process of dealing with DWP has been very stressful and frightening as I have worked most
of my life. She has given me a reason to live and that I am not hopeless by treating me so
kindly like a normal person. 
The huge problems that seemed impossible to face as I kept asking for help and getting
nowhere until [the team] changed my life for the better are now being looked at.
[My case worker] kept in contact and consistently been available and kindly given her time
and advice and also a lot of other helpful information. Thanks to her I have been focussing on
health,  eating and sleeping properly and hopefully will be able to get a job in the future. 
Thank you.  I cannot thank you and your staff enough”.   
A Case Study
A tenant was referred by a local housing office due to her rent arrears.  On visiting
her, it became apparent that she had multiple debts, including priority debts, and she
was not managing to meet her payments. Her income was increased, including
through support to claim disability benefits, but she was reluctant to engage in debt
270

Page 271

22 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
advice as she felt she could then deal with her debts herself. 
A couple of months later she was again referred for her rent arrears. At this point her
case was being taken to court and the housing office were requesting eviction from
the property.  She had withdrawn from speaking with her housing officer and all other
agencies involved with her. She continued to be reluctant to engage in debt advice,
but when an eviction date was given, she did, and potential debt solutions were
discussed.  Her options were limited, and she chose to apply for bankruptcy but
then, after being advised on what was required to make the application she again
withdrew. Meantime, the eviction had been postponed on the grounds that she would
engage and work the adviser.  After several attempts to re-engage with her to
discuss  the severity of the situation, we were able to apply and she was granted
bankruptcy, including her rent arrears and all other debts. Both her mental and
physical health had deteriorated due to the situation she was in, but when concluded
she said that this was:
“Like a weight lifted off my shoulders….I have not been sleeping or eating due to
worry and anxiety and feel as if I can now look forward and start afresh…..I do not
know what I would’ve have done without the service or where I would have ended
up”.
The outcome of the referral – income maximised to include disability benefits, £17k
debt written off and the tenant and her child were able to remain in their home. 
9. Money Smart Priorities and Ambitions to 2030
The following strategic priorities will build on the strategic ambitions for 2023-25,
including service developments and the work of the Financial Inclusion Partnership
over the last two years. 
Provision of Early and Effective Support – to meet this ambition we will
ensure services are accessible at point of need through: 
1. Co-location of welfare rights advisers within GP surgeries mainstreamed as
Scottish Government Funding ends. 
2. Engagement with parents through established referral pathways with
schools, from early learning to secondary level. 
3. Early engagement with council tenants in, or at risk of being in rent arrears,
to provide support with managing payments, to put debt strategies in place
and sustain tenancies, through established partnership with Housing
services. 
4. Established referral routes and co-location with key Health and Social Care
and NHS services 
5. The Advice Line delivery model implemented in 2025 which aims to ensure
that those who choose to access the service by phone have their call
answered, as far as possible, by a ‘duty’ adviser who can provide initial
advice and support at point of contact.
6. The Financial Inclusion Partnership, through which we will:
o Challenge stigma and fear as barriers to engagement, to encourage
and motivate residents to access support at an early stage. 
o Build a more collaborative approach to communications to raise
271

Page 272

23 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
awareness of all advice and wider financial inclusion services and
access points across North Ayrshire 
Wellbeing – Enabling Communities – to meet this ambition we will:
1. Pro-actively measure customer satisfaction and seek feedback and
empower service users to identify potential service improvements and
developments, to inform the content of campaigns and decision-making.  
2. Build financial resilience through improving knowledge of and skills and
confidence in the welfare rights system and managing personal finances to
improve health and wellbeing
3. Raise awareness of welfare rights entitlements and systems through
routine casework and promotion of ongoing welfare reforms and take-up
campaigns. 
4. Provide specialist debt advice to put debt strategies in place, maximise
disposable income and effectively manage household budgets
5. Early engagement with residents signing up to council tenancies and existing
tenants approaching state pension age, to support with maximising
income/tenancy sustainment through established partnership with Housing
Services
6. Build on the holistic approach to pro-actively identifying wider and
underlying issues and support engagement with other service providers to
achieve sustainable positive outcomes. 
Tackling Inequalities through Community Wealth Building – we will:
1. Reach out to marginalised people in our communities to promote our
services, improve accessibility and support engagement, in particular those
in our island communities, from minority ethnic groups, the more socially
isolated, those experiencing in-work poverty and residents in gypsy
traveller encampments
2. Evidencing the number of Money Smart clients who, as a result of advice
and support received, are ‘more confident managing their household
budget’ and who feel ‘better prepared for unplanned, and planned
expenditures’, which provide an indication of sustainable positive outcomes
and impact on child poverty
3. Through the Financial Inclusion Partnership, identify gaps in service
provision and seek further opportunities for collaboration to ensure the
needs of all people in our communities are met 
Develop and support our Workforce – to meet this ambition we will:
1. Ensure that in the current economic climate and with the increasing
complexity of the welfare rights system, our people continue to be able to
provide the expert, high quality welfare rights and debt/money advice which
is much valued by people in our communities through the Performance
Management and Quality assurance Framework. 
2. Through the AdvicePro case management system and Performance
Management and Quality Assurance Framework:
o Encourage and support a culture of continuous improvement 
o Produce public performance reports for Money Smart which
evidence the totality of our work and the outcomes achieved for
272

Page 273

24 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
people in our communities  
3. Achieve accreditation to the Scottish National Standards for Information and
Advice Providers for Welfare Rights and Money Advice, to evidence to
funders and to the public, the high-quality services delivered by our team. 
4. Ensure that the increasing demands and strain on our people does not
impact on the essential time needed for ongoing training to maintain expert
knowledge of ongoing welfare reforms and to ensure quality assurance
measures are sustained. 
5. Seek opportunities to use technology where appropriate, to deliver more
efficient and effective services and maximise use of resources
6. Through the Financial Inclusion Partnership, share information, knowledge
and expertise to enhance all services. 
North Ayrshire Council’s No Wrong Door policy builds on existing efforts to
ensure that residents can access the funding of support they need, whether this
be in relation to paying energy bills, accessing education grants for footwear
and school meals or finding out more about state benefits.  Through this
strategy, our Money Smart team, via our priorities and ambitions and in
collaboration with the Financial Inclusion Partnership aims to support a more
financially healthy North Ayrshire for the benefit of individuals, their families,
communities, businesses and the economy. 
273

Page 274

25 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Contact Information for Advice and Financial Inclusion Services 
Money Smart -  call 01294 310000 or email moneysmart@north-ayrshire.gov.uk 
CHAP – Call 030 0002 0002 or email enquiries@chap.org.uk 
Lemon Aid – Lemon Aid Self Referral Form - Cunninghame Housing Association 
1st Alliance Community Bank Call 01294 557123 or email
info@allianceayrshire.co.uk 
Cunninghame Housing Association   Call 01294 607553 
Cairn/ANCHO Housing Association   Call 0800 990 3405 
Riverside/Irvine Housing Association  Call 0345 112 6600 
Citizens Advice Scotland    Call 0800 028 1456
Stepchange Debt Charity    Call 0800 138 1111 
274

Page 275

26 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Links 
NAHSCP Strategic Commissioning Plan
Council Plan
CWB Strategy 
References
• What are the drivers of child poverty? - Tackling child poverty delivery plan
2018-2022: annex 2 - gov.scot
• End Child Poverty Coalition. (Various years). Local Child Poverty
Estimates. (Data modelled by Centre for Research in Social Policy,
Loughborough University). North Ayrshire 2022/23 child poverty after
housing costs figure. 
• Joseph Rowntree Foundation (JRF). (2025). UK Poverty 2025: The
essential guide to understanding poverty in the UK. Joseph Rowntree
Foundation.  ‘very deep poverty’ statistics. 
• North Ayrshire Community Planning Partnership. (2018). People's
Panel Survey 2018 Report. North Ayrshire Council. 2018 adult financial
wellbeing data. 
• North Ayrshire Community Planning Partnership. (2022). People's
Panel Survey 2022 Report. North Ayrshire Council. 2022/23 adult financial
wellbeing data (e.g., % with no savings, % with unsecured debt, % not
managing well. 
• SIMD. (2020v2). Scottish Index of Multiple Deprivation 2020.  
• Scottish Government. (2025). Poverty and Income Inequality in Scotland:
2021-24. Scottish Government. (Published March 2025). National Scottish
child poverty rates (relative AHC and BHC) for 2023/24, and the proportion
of children in poverty in working households for 2021-24. 
• Scottish Government. (2025) Labour market insight Living Wage data 
Local child poverty dashboard - gov.scot
Poverty in Scotland 2024 | Joseph Rowntree Foundation
Poverty: facts and figures | CPAG
275

Page 276

27 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
https://www.gov.scot/publications/scottish-house-condition-survey-2022-key-
findings/pages/3-fuel-poverty/
Debt advice in the post-pandemic landscape | Money and Pensions Service
(maps.org.uk)
Missing out 2024: £23 billion of support is unclaimed each year | Policy in
Practice
https://www.gov.scot/publications/scottish-house-condition-survey-2023-key-
findings/
What is the Poverty Premium - Fair By Design
276

Page 277

Integration Joint Board
25th September 2025
Subject:  Chief Social Work Officer Annual Report 24/25
Purpose:  To provide board members with awareness of the annual Chief
Social Work Officer report which is required by the Scottish
Government.
Recommendation:  The IJB are asked to note: 
1. Notes the contents of this report, in particular the successes and
challenges.
2. Acknowledges the three key issues brought to the attention of
IJB.
3. Note that the CSWO will submit the annual report to Chief Social
Work Advisor in Scottish Government. 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
CSWO  Chief Social Work Officer 
MHO Mental Health Officer
ASP Adult Support and Protection
CP Child Protection
LAG Local Authority Guardianship
PWG Private Welfare Guardianship
SOLACE Society of Local Authority Chief Executives
HSCP Health and Social Care Partnership 
1. EXECUTIVE SUMMARY 
1.1 There is a requirement for every Local Authority to appoint a professionally qualified
Chief Social Work Officer (CSWO) and this is contained within Section 3 of the Social
Work (Scotland) Act 1968 as amended by Section 45 of the Local Government etc.
(Scotland) Act 1994. 
1.2  In line with the legislation and guidance, the CSWO is required to prepare an annual
report for the Council, on all statutory, governance and leadership functions of the
CSWO role. 
1.3  This report will also be presented to the North Ayrshire Council Cabinet for
consideration on the 30th September 2025. 
Agenda Item 14
277

Page 278

2. BACKGROUND 
2.1 In 2014, the Office of the Chief Social Work Adviser, following consultation with
CSWOs across Scotland, SOLACE and others, identified a more standardised
approach to prepare the annual reports. 
2.2 The report provides an overview by the CSWO of the partnership structures,
governance arrangements and the performance of social services in the context of the
demographic landscape of North Ayrshire. It looks more closely at the statutory
functions of the service and the quality and workforce development within
services. 
2.3 The report highlights the range of Social Work activity throughout the year and
places that in the context of the socioeconomic challenges faced locally.  Within the
report there are three key issues I would like to bring to the Board’s attention: 
Practice
Practice remains strong. We have seen our workforce vacancy rate sit in to 10
– 12 percent range cross Social Work services.  Our internal pipeline of
graduates and dedication from our practice educators and team managers is
allowing us to maintain staffing levels and to safely integrate newly qualified
Social Workers.  Case reviews across the year provide assurance on the
leadership, value base and ethical nature of Social Work practice and decision
making. 
Public Protection
The year past has seen a new independent chair for APC and CPC, Derek
Frew, who has offered fresh eyes and perspectives that have been supportive
of our strategic aims in public protection.  I would also wish to formally
acknowledge John Pattersons many years of service to North Ayrshire
following his retirement. 
Our level of children subject to statutory measures remains high at 258
however the number of orders terminating is down 30% from the previous year. 
Child Protection Orders are also at their highest levels since pre covid times.
This data begins to evidence the complexities and increasing risk profile which
directly impacts on our frontline Social Work capacity in children and families
social work. 
Our justice services continue to see high levels of activity in relation to unpaid
work, and bail assessments which would reflect the courts seeking community
disposals given the pressures present within the prison estate.  I would also
commend the practice of our services in managing the early release scheme in
the year past. 
Mental health and addiction services have maintained high levels of
performance in terms of accessibility to services.  The opening of the new
Mental Health Unscheduled Care Hub is an important development from a
social work perspective as last year’s concerns about the mental health and
wellbeing of our residents has shown no sign of diminishing.  In the year past
we saw emergency and short-term detentions pass last year’s record numbers
by 20% (emergency) and 14% (short term).  Alongside this, the number of
individuals for whom the CSWO is their legal guardian also increased to by
25% to 151.
278

Page 279

Our adult support and protection activity has also continued to see increased
activity with AP1’s and AP2’s at their highest level.  Underpinning this is a
continued steady number of adult concern reports which evidences a good
understanding from partners of risk and an understanding of the role of social
work services in assessing and managing risk. 
Considerable efforts have been made to strengthen our position in relation to
our understanding of how responses to the most significant incidents of
domestic violence safeguard women and children.  This is a complex area of
practice for agencies working together within a pan Ayrshire context.  With this
in mind, North Ayrshire has been working to understand and address the issue
of multiple referrals to the Multi Agency Risk Assessment Conference
(MARAC).  Alongside this, North Ayrshire Council have invested in a new lead
officer post which is currently being recruited to in order to maximise the
coordination and impact of our interventions in this critical area. 
Learning review requests continued to be received over the year with 2 reviews
commissioned.  Common themes reflect the increasing risk profile and levels
of distress being experienced. 
The impact of the financial context
Our risk exposure continues to grow with every passing month.  Last year’s
overspend of £3.593m of which £2.036 was in social care services placed
financial strain on parent bodies and reflects the level of need and demand
present in our communities and the increasing cost of delivering care.  Work
underway in development of the 2026-27 budget are worthy of early notification
in terms of its impact on sustainable service delivery options. 
In the social work and social care sector the ability to manage services is
critically driven by demand and capacity variables.  Professional advice offered
has been clear in relation to the risks of being able to meet all social work
duties.  A clear position has been taken in relation to the non-negotiable nature
of leaving children or adults in situations where they are likely to experience
significant harm.  I am confident in the judgement being exercised by the
professional social work leads across service areas in this regard. 
With the continued pressure on public finances in the immediate and longer
term, the backdrop of local population need described in the annual report
requires us to ensure the focus remains on managing risk and ensuring that
every resource is utilised to its maximum and reaches our most vulnerable
residents first.  That invariably means that in some cases residents will
experience an absence of service that will be difficult for them and their families. 
3. PROPOSALS 
It is proposed that the Integration Joint Board notes the key themes and challenges
detailed in the report and that it endorses the report as set out in Appendix 1 and note
that the CSWO will this to Scottish Government. 
3.1 Anticipated Outcomes 
That North Ayrshire Council, the Integration Joint Board, and the Scottish Government
are made aware of the positive impact of Social Work Services in North Ayrshire as
well as the significant challenges that are being faced. 
279

Page 280

3.2 Measuring Impact 
Impact will be measured in terms of the direction and support to continue to transform
the delivery of Social Work Services and manage the increased risk profile. 
4. IMPLICATIONS 
Financial:  None
Human Resources:  None
Legal:  The delivery of Social Work services remains a statutory duty of
North Ayrshire Council whilst delegated to be delivered by the
Health and Social Care Partnership.
Equality:  None
Children and Young
People
None
Environmental &
Sustainability:
None
Key Priorities: This report covers matters which contribute to the key priorities
within the Council and IJB Strategic Plans. 
Risk Implications: The delivery of Social Work Services is a statutory duty placed on
North Ayrshire Council and delegated to the Integration Joint
Board. 
Community
Benefits:
N/A
United Nations
Rights of the Child
(UNCRC) 
This report highlights issues that have a direct and indirect impact
on the rights of children and young people particularly in relation
to article 3.  Article 3 states that (1) in all actions concerning
children the best interests of the child shall be a primary
consideration. (2) States Parties undertake to ensure the child
such protection and care as is necessary for his or her well-being,
taking into account the rights and duties of his or her parents,
legal guardians, or other individuals legally responsible for him or
her, and, to this end, shall take all appropriate legislative and
administrative measures. (3) States Parties shall ensure that the
institutions, services and facilities responsible for the care or
protection of children shall conform with the standards
established by competent authorities, particularly in the areas of
safety, health, in the number and suitability of their staff, as well
as competent supervision.   
This report outlines child protection practices, a commitment to
keeping families together wherever possible and on the quality of
residential and fostering services which indicates how North
Ayrshire works to uphold article 3. 
Direction to :- 
1. No Direction Required X
280

Page 281

Direction Required to
Council, Health Board or
Both 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
5. CONSULTATION 
5.1 The Partnership Senior Management Team and operational services have contributed
to the contents of this report. 
For further information, please contact Scott Hunter, Chief Social Work Officer on
scotthunter@north-ayrshire.gov.uk Click here to enter text. 
281

Page 282

Chief Social Work Officer
Report
2024 – 2025
282

Page 283

Contents
Introduction .............................................................................................................. 1
Demographics .......................................................................................................... 2
Locality Planning...................................................................................................... 3
Progress 2024 to 2025 .......................................................................................... 3
Localities – Initial Insight ..................................................................................... 3
Garnock Valley ................................................................................................... 3
Irvine ................................................................................................................... 4
Kilwinning ........................................................................................................... 5
North Coast and Cumbrae................................................................................. 5
Three Towns ....................................................................................................... 6
Arran ................................................................................................................... 7
Planned Activity .................................................................................................... 7
1. Governance, Accountability and Statutory Functions ................................... 8
1.1 Overview of the North Ayrshire Health and Social Care Partnership ......... 11
Visions, Values and Priorities............................................................................. 11
2. Service Quality and Performance................................................................... 12
2.1 Children, Families and Justice Services..................................................... 12
Brighter Pathways Programme Board ................................................................ 12
Whole Family Wellbeing Fund ........................................................................... 12
Promise Conference .......................................................................................... 13
Family Centred Wellbeing Service ..................................................................... 13
Child Protection Registrations ............................................................................ 14
Breastfeeding ..................................................................................................... 14
United Nation’s Convention on the Rights of the Child ...................................... 15
Child Healthy Weight ......................................................................................... 16
Health Visiting .................................................................................................... 16
Key Performance Indicators ............................................................................... 19
2.2 Adults ......................................................................................................... 22
North Ayrshire Drug and Alcohol Service ........................................................... 22
North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation (eICT)
........................................................................................................................... 23
Anam Cara Refurbishment ................................................................................ 24
Mental Health Facility ......................................................................................... 26
283

Page 284

Trindlemoss Day Opportunities .......................................................................... 27
Out of Hours Social Work Service...................................................................... 28
Self-Directed Support ......................................................................................... 28
Care at Home..................................................................................................... 29
Carers ................................................................................................................ 30
2.3 Criminal Justice .......................................................................................... 31
Multi Agency Public Protection Arrangements (MAPPA) ................................... 31
Community Payback Orders .............................................................................. 31
Drug Treatment and Testing Order .................................................................... 32
Diversion from Prosecution ................................................................................ 33
Case Study: Employability Mentors ................................................................... 34
Key Performance Indicators ............................................................................... 36
3. Resources ........................................................................................................ 39
3.1 Financial Pressures ................................................................................... 39
3.1 2025-26 Budget ........................................................................................ 39
3.4 Medium Term Financial Outlook .................................................................. 42
4. Workforce ......................................................................................................... 44
4.1 Workforce Planning .................................................................................... 44
4.2 Workforce Support and Development ........................................................ 46 
284

Page 285

1 
Introduction
Welcome.
It is a pleasure to introduce this year’s Chief Social Work Officer report for North
Ayrshire which covers the period 1st April 2024 through 31st March 2025. 
It is now very evident within the local context that because of sustained societal,
economic and wider macro political factors we are seeing a worsening picture in
terms of our ability to support everyone in our community who needs our support.
This is counter intuitive to the Social Work task. We see increasing demands for
services, rising complexity and comorbidity, escalating care costs, workforce
challenges, policy and legislative developments. 
The solution to the challenges we face lies in our commitment to partnership
working. From our interface with our NHS colleagues, Police Scotland and the wider
North Ayrshire Council, Social Work services model an approach that respects and
values difference and seeks the common ground to challenge inequality in our
society. This report evidences that despite these challenges Social Work and Social
Care services continue to deliver consistent services through the dedication of our
practitioners and their commitment to support and protect the citizens of North
Ayrshire. 
I am also pleased to report that our leadership and governance arrangements have
remained strong in the year past. Engagement and questioning by the Integration
Joint Board and NAC Executive Leadership Team on Social Work matters has been
productive and supportive. Alongside this our Social Work Governance Board has
offered direction on a range of key areas across all spheres of Social Work and
remains a lively forum for professional discussion with representation from all levels
of Social Work in North Ayrshire.
Finally, I would like to place on record my appreciation for the compassion and
commitment displayed day in, day out by our practitioners, managers, business
support staff and partners to ensure that Social Work and Social Care services are
delivered to the very best of our abilities. 
Scott Hunter
Chief Social Work Officer
North Ayrshire Health and Social Care Partnership 
285

Page 286

2 
Demographics
North Ayrshire is home to approximately 133,570 people, (National Records for
Scotland, Mid-2023 Population Estimates Scotland) all living in its many towns,
villages, and islands, with slightly more females (52.1%) than males (47.9%). 15.8%
of the population are aged 0 to 15 years, 9.3% are aged 16 to 24 years, 21.7% are
aged 25 to 44, 29.1% are aged 45 to 64 years of age, 13.2% ages between 65 to 74
years of age, with 11.0% of our population aged 75 years and above. 
The latest update of the Scottish Index of Multiple Deprivation has reconfirmed the
deep structural challenges faced by many communities in North Ayrshire, despite
steady progress by North Ayrshire Council in its ongoing commitment to eradicate
poverty. North Ayrshire is ranked as the fifth most deprived council area in Scotland. 
Some of the area’s most heavily affected by deprivation are concentrated in the
Three Towns and Irvine areas but areas in Kilwinning and the Garnock Valley also
have above average deprivation. 
286

Page 287

3 
Locality Planning
Locality Planning is the local mechanism for strategic planning in which local
priorities are developed for smaller geographical areas across the local authority. In
2023 it was decided that the framework for carrying out Locality Planning would be
revised in order to involve new methods for community engagement and ensuring
continued leadership through new Locality Chairs. The HSCP is now halfway
through its 2-year process to carry out extensive research in order to develop locality
plans with localised priorities and actions for each area. The research process
involves:
• Engagement: Twice per year, Locality Conversations will be held within each
locality in order to collect information from different people within the
communities, and feedback what we are doing with the information
• Local data: Overall locality data to identify the initial priorities and more in-
depth data on specific issues for each area.
• Local services: Mapping the existing services across each locality.
• Community Planning: consideration of the existing locality priorities the wider
community planning partnership is working towards.
Progress 2024 to 2025
The first set of locality conversations took place between the 15th and 22nd of April
2024 and were in the form of 2-hour workshops with local staff and members of the
public invited to intend. This allowed us to explain a bit about the new process and
collect initial community perceptions and challenges. There were 5 workshops held
with 32 participants.
In September 2024, local community groups that focussed on people with shared
characteristics were contacted and visited by an Engagement Officer to discuss if
there were any specific barriers experienced to accessing health and social care
services as a result of their shared or protected characteristics. The aim of this was
to ensure that the experiences of different equalities groups were captured in the
process, and they were visited at their own spaces to ensure attendance, and over
the month of September, 23 groups were visited with 206 participants.
Localities – Initial Insight
Garnock Valley
Garnock Valley seems to sit around the middle of the localities in terms of
performance indicators, but our residents still experience poorer outcomes when
compared to the Scottish figures. For example, 40.3% of the population lives within
the 20% most deprived areas and the child poverty rate in the Kilbirnie and Beith
Ward at 29.5% is above the general North Ayrshire rate of 29%.
All areas within North Ayrshire have a higher over 65 population than Scotland, with
Garnock Valley at 21.6% compared to Scotland’s 19.6% and North Ayrshire’s 23.3%,
287

Page 288

4 
and general health indicators are also around the middle of the other localities,
though Garnock Valley does have highest deaths per 100,000 for those aged 15-44.
Indicators for Garnock Valley are generally consistent across the majority of
outcomes that they perform better than North Ayrshire but worse than Scotland. This
is why it is important to recognise that although there are other localities with higher
poverty and deprivation, a higher older population, more complex health needs etc. it
still experiences issues when compared to other parts of Scotland. 
So far, 23 people from the Garnock Valley have participated in engagement between
the general and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Poor transport links across the area and the impact of accessing
appointments and work.
• Access to GPs and possibility of targeted clinics for key issues in community
spaces.
• Finding information about health and care services. 
• Long waiting lists.
• Older population and digital accessibility.
Irvine
Irvine is the largest locality in North Ayrshire by population, and one of the more
accessible in terms of local services and amenities. According to data it has much
higher levels of deprivation than the national levels but is not as high as some of the
other areas in North Ayrshire, for example 45.7% of the population lives within an
area that is within the 20% most deprived in Scotland, which is only third highest
locally. For many indicators Irvine performs the poorest other than Three Towns,
such as for drug related hospital admissions, alcohol specific deaths, psychiatric
patient admissions. 
Unemployment is not as high as other areas, the third lowest in the area behind
Arran and North Coast and is about average for Scotland, and Health and Social
Work is the second highest employment sector behind wholesale and retail, and the
GVA per capita is higher than average for the area, possibly due to Irvine being the
most populous town in the area. 
So far, 98 people from Irvine have participated in engagement between the general
and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Low-level social interventions and community support groups in promoting
mental and physical wellbeing.
288

Page 289

5 
• Affordable leisure options and increased funding and support for community-
run initiatives.
• Increased patient voice in care planning.
• Difficulty in accessing reliable information about health and social care
services. 
• Outdated or incorrect online information makes it hard to navigate resources. 
Kilwinning
Kilwinning performs poorly for economic indicators, with the second highest rate of
unemployment and the second highest proportions of people living within the 20%
most deprived area in Scotland, behind Three Towns for both. Child poverty in the
Kilwinning ward is slightly higher than the North Ayrshire rate, which is higher overall
that Scotland, but it has increased by 8.3 percentage points between 2021 and 2022.
For general health, life expectancy is lower than the Scottish figures and North
Ayrshire averages but are again not as low as Three Towns for male and female,
and Irvine for female. The 65 plus population is the lowest in Kilwinning of all the
localities and it has the lowest rate of delated discharges of those 65 plus of the
localities and the Scottish and North Ayrshire rates, and the lowest unscheduled
acute specialty beds. 
For indicators related to substance use, Kilwinning is around the middle of the
localities, but still higher than the Scottish rates.  The averages are also affected by
far lower than average numbers for Arran and North Coast and far higher numbers in
Three Towns and Irvine. Similarly for prescribed anxiety medication, the rate is the
third highest of the localities but Three Towns, Irvine, Garnock Valley and Kilwinning
are all above the Scottish proportion. 
So far, 37 people from Kilwinning have participated in engagement between the
general and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Centralised community hubs and improved transport links to enhance service
accessibility.
• Increased investment in self-care resources, clearer pathways, shorter waiting
times, and trauma-informed crisis support.
• Difficulty accessing information about services and accessing appointments.
• Other barriers were discussed such as financial, language, and digital.
North Coast and Cumbrae
The North Coast and Cumbrae (NC&C) locality is more affluent than other areas of
North Ayrshire, with fewer areas of deprivation, lower unemployment, and a higher
289

Page 290

6 
average house price than the other mainland localities. There is a much higher
proportion of older people with 32.3% of the population aged 65 and over, which is
12.7 percentage points more than the Scottish figure of 19.6%. 
Despite the older population, overall health indicators are better than other areas,
with a high life expectancy and lower rates of cancer registration, low rates of
hospital admission and death related to substance use, and lower rates of anxiety
medication and psychiatric admissions. These may also be related to the area’s
affluence when compared to the other localities. 
The only health indicator in the initial profiles that is higher in NC&C is unscheduled
acute specialty bed days per 100,000 population. Emergency admissions and A&E
attendances aren’t particularly different for the area so this may also relate to the
older population. 
So far, 21 people from North Coast have participated in engagement between the
general and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Importance of low-level and community-based support, particularly more
services around dementia and learning disability. 
• Poor transport links and access to patient transport.
• HSCP money allocation, and how this is communicated or understood by the
public.
• Care packages and decisions around them.
Three Towns
The Three Towns locality has poorer outcomes in many indicators when compared
to the other localities, as well as the national rate. The performance indicates that the
Three Towns locality experiences higher rates of poverty and socio-economic
disadvantage. The locality has the highest level of people living within the 20% most
deprived areas of Scotland at 57%, and also has the highest rates of child poverty,
and the highest unemployment rate of the localities, as well as lower house value
and more lower council band properties than other areas. 
Areas with higher levels tend to have poorer health outcomes, which is evident in the
general health indicators. Three Towns has the lowest life expectancy rates, as well
as high rates of emergency admissions. The Three Towns locality has the highest
figures out of all the localities and is much higher than the Scottish and North
Ayrshire averages for indicators related to alcohol and drugs, and alongside Irvine
has the highest rates for indicators related to mental health care. 
So far, 19 people from Three Towns have participated in engagement between the
general and targeted equality engagement.
290

Page 291

7 
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Accessibility of primary healthcare services, particularly the challenges in
booking appointments, long waiting times, and the difficulties faced by those
with mobility issues.
• The impact of social deprivation on mental health was noted, alongside the
necessity for targeted support across various stages of mental health issues,
from prevention to post-crisis care.
• Difficulty accessing information about services or knowing where to go.
• Discussion of methods to reduce harm from drugs and alcohol, to improve
safe drug use and reduce stigma.
Arran
Arran has an established locality planning arrangement which has been in place for
many years due to the specific and persistent challenges of the Island. These
arrangements have a governance that sits under the Island Plan and the Health and
Social Care Partnership will develop health and social care priorities for Arran under
this existing governance structure and using engagement that has already been
carried out with the islanders. This will occur using the same timescales as our
mainland localities.
The Key themes of the Arran Island Plan are:
• Economy
• Community
• Environment
A Health and Social Care Locality Plan for Arran will be consistent with these
existing themes and aim to focus on how health and care needs will be met in Arran.
Planned Activity
Over 2025 to 2026, the HSCP will carry out engagement with children and young
people, and further engagement with services users in September 2025. Collected
data will be analysed to inform each locality’s priorities, and the data and
engagement will be analysed to identify the key priorities.
The Strategic Plan is currently under revision and once complete, Locality Plans will
be developed and published for each locality and annual reporting for each will
commence. 
291

Page 292

8 
1. Governance, Accountability and Statutory Functions
The Chief Social Work Officer is a statutory appointment by virtue of Section 3 of the
Social Work (Scotland) Act 1968. The Chief Social Work Officer is appointed for the
purposes of the Council's functions under the 1968 Act and under those other
enactments listed in Section 5(1B) of that Act. In broad terms, those functions cover
all social work and social care services whether provided directly by the council, in
partnership with other agencies, or procured by the council and provided by others
on its behalf. Those functions are referred to as “social work services”. 
The qualifications required for the post are set out in the Qualifications of Chief
Social Work Officers (Scotland) Regulations 1996. The Chief Social Work Officer is
required by section 5(1) of the 1968 Act to carry out the duties of the post under the
general guidance of the Scottish Ministers. The Scottish Ministers issued revised and
finalised guidance in January 2010. 
The overall powers of the Chief Social Work Officer post are:- 
(a) To oversee the discharge of the council's statutory social work duties; 
(b) To ensure the provision of effective professional and objective advice to elected
members and officers of the Council in the Council's provision of social work
services; 
(c) To secure the effective provision of social work services. 
The powers of the Chief Social Work Officer fall into two broad categories; service
provision and corporate responsibility:
Service provision
• To establish and develop social work services focussed on the needs of
service users, to promote the continuous improvement of those services, and
to monitor and raise standards of their delivery; 
• To ensure the effective governance of the balance of need, risk and civil
liberties in the provision of social work services in accordance with
professional practice; 
• To provide advice on all aspects of workforce planning including safe
recruitment practice, supervision, monitoring and assessment of social work
students, securing of professional qualifications and continuous learning and
development for staff, and supporting and advising managers in all aspects of
staff supervision; 
• To ensure the existence of systems to both promote good practice and
identify and address poor practice in the provision of social work services; 
• To ensure that significant case reviews are undertaken of all critical incidents
either resulting in, or which may have resulted in, serious harm or death; and 
292

Page 293

9 
Corporate Responsibilities
Corporate responsibility
The Chief Social Work Officer has the following corporate powers which require
direct access to the Council's Chief Executive’, Elected Members of the Council and
the Chief Officer, and the provision of forthright and independent advice to them:- 
• To ensure compliance with the Council’s statutory duties to prepare, publish
and review plans for the provision of social work services. 
• To promote, communicate, support and review values and standards of
professional practice, and to ensure that they are adhered to. 
• To establish, in conjunction with the Council's Corporate Management Team,
appropriate experience and qualified cover for the post of Chief Social Work
Officer during the post-holder's absence or incapacity. 
• To report to the Chief Executive and Chief Officer any failure in the Council's
corporate policy or governance arrangements designed to reflect the proper
balance amongst need, risk and civil liberties in the provision and
management of social work services. 
• To report to the Chief Executive and Chief Officer any weaknesses and
failures in the systems in place to promote good practice and identify and
address poor practice in the provision of social work services. 
• To report and provide independent comment where necessary to the Chief
Executive, Elected Members of the Council and the Chief Officer on the
findings of significant case reviews and relevant performance reports and on
any other social work related issues. 
• To provide an annual report to the Council on all of the statutory, governance
and leadership functions of the role of the Chief Social Work Officer
North Ayrshire continues to invest in its oversight of Social Work activity through the
provision of a standalone Chief Social Work Officer, further supported by a formal
Depute CSWO. The CSWO reports directly to the Director of the NAHSCP and has a
direct line to the Chief Executive of the Council. The CSWO represents Social Work
within a range of strategic groups including:
IJB, IJB Performance and Audit Committee, IJB Strategic Planning Group, NAHSCP
Health Care Governance Committee, HSCP Partnership Senior Management Team,
Alcohol and Drugs Partnership, Child Protection Committee, Adult Protection
Committee, Chief Officers Group, Carers Advisory Group, Children’s Services
Strategic Planning Partnership; Corporate Parenting Board, Transitions Strategic
Group amongst others.
The CSWO also provides professional oversight as a member of the Care Home
Oversight Group and the Care at Home Oversight Group. These groups continue to
fulfil key governance activity in relation to the Social Care sector. 
293

Page 294

10 
The CSWO has regular contact with the Independent Chair of CPC and APC to
ensure public protection oversight. The year past has seen North Ayrshire
commission one learning review. 
Social Work and Social Care matters are regularly reported to the IJB and Clinical
and Care Governance Committee. There is a particular focus on the impact of policy
and external scrutiny activity. The CSWO maintains regular calls with our Care
Inspectorate strategic link to share developments and hear of national developments
that support activity in North Ayrshire. The CSWO also contributes to quarterly calls
with the inspectorate and the broader PSMT.
The primary governance of practice matters remains the Social Work Governance
Board. The board terms of reference and membership have been refreshed in the
current year with the support of the professional leadership group. The board has
had a full agenda of issues over the year and has provided support and governance
in relation to a range of matters including:
• Practice Guidance for Social Workers Assessing Capacity and Practice
Enhancement Notice: In Person Assessments for Complex Cases 
• Re-modelling of acute in-patient service for adults with learning disabilities
• Chronology Training and Practice Improvement
• Community Justice Outcome Implementation Plan (CJOIP)
• HSCP Refugee and Resettlement Team Transition
• National Social Work Agency Workforce Improvement
• AWI Delayed Discharge - best practice
• Test of Change – All Age Disability Service 
294

Page 295

11 
1.1 Overview of the North Ayrshire Health and Social Care Partnership 
Visions, Values and Priorities
Our Partnership includes health and social care services within Health and
Community Care Services (H&CC), Mental Health and Learning Disability
Services and Children, Families and Justice Services. 
In this report, we look back on the progress we have made, share some of our
successes and reflect on some areas that have proved challenging. 
This report aligns with our “Caring Together” Strategic Commissioning Plan 2022-
2030. This is the first time the Health and Social Care Partnership has set out such a
long-term plan for how we intend to improve services and the health and wellbeing of
the local community. The plan set out our pandemic recovery intentions, as well as
offering a longer-term vision for local health and social care services. Over the period
of this strategic plan, the Health and Social Care Partnership will seek to: 
We see these priorities as interlinked, and we expect that where we see success
against one priority, it’s effect will positively impact against others.
People who use our services and North Ayrshire residents will experience our
Partnership values in the way our staff and volunteers engage with you and how we
behave. We will treat you with: 
295

Page 296

12 
2. Service Quality and Performance 
2.1 Children, Families and Justice Services
Brighter Pathways Programme Board
A transformation programme to improve outcomes and opportunities for care
experienced children and young people in North Ayrshire is now under way, with
progress being made since its launch in April 2024.
The Brighter Pathways Programme Board was set up to look at how services can
be delivered differently to ensure care experienced children and young people have
access to the appropriate resources and supports into adulthood.
In line with its Promise commitments, North Ayrshire Health and Social Care
Partnership (NAHSCP) has a firm focus on providing the right support and
intervention to allow children and young people to remain with birth family or wider
family wherever possible, preventing them from coming into local authority care - for
example, being placed in foster care or in residential children’s houses. 
To build on this already established early intervention work, the Board is currently
looking at the supports available for families to identify if there are any gaps in
service provision where additional early help and more intensive support could help
more children to remain with their
families.
An acute challenge in recruiting and
retaining foster carers is having an
impact nationally, which has been
further impacted by the current cost
of living crisis and a reduction in the
number of potential foster carers
having spare bedrooms due to an
increase in home working and their
own children staying at home for
longer.
Recruiting foster carers for NAHSCP is further impacted by a number of independent
fostering agencies operating in the area and taking on carers. In a bid to boost
recruitment, which is a priority for the programme board, an investment in a long-
term digital marketing campaign has recently been agreed, working with a provider
that has a proven track record in local authority foster care recruitment.
Whole Family Wellbeing Fund
In 2022, the Scottish Government created the £500 million Whole Family Wellbeing
Fund (WFWF) for the life of the current parliament (2022 to 2026) to facilitate the
delivery of holistic family support, with the expectation this will reduce inequalities in
family wellbeing, lessen requirements for family crisis intervention and decrease the
number of children and young people living away from their families.
296

Page 297

13 
The Fund is now in year three of the four-year implementation period. There are a
total of 16 projects and services in North Ayrshire that have benefitted from WFWF
including, Family Centred Wellbeing Service, Dads Worker, Barnardos Stronger
Families and Helping Hands. Seven projects are Third Sector projects, six are
NAC/HSCP projects while 3 are independent projects.
Promise Conference
The Annual Promise Conference 2024 was held on Monday 9th December and
saw 73 young people from across our Secondary Schools join for a day of
connection.
The aims of the Conference were to:
• Introduce young people to The Promise Plan 2024-2030.
• Offer workshops centred around The Promise’s foundation of voice.
• Allow time for building connections with other young people and Corporate
Parents.
The day was hosted by Donna Anderson, North Ayrshire Council’s Youth
Participation and Democracy Officer, and Adam Johnson, local Care Experienced
young person and MSYP for Cunninghame North. 
Young people were involved in the planning of the Conference at all stages. This
year’s agenda included interactive workshops delivered by local Corporate Parents
nominated by young people.
Family Centred Wellbeing Service
The Family Centred Wellbeing Service (FCWS) are a team of 14 wellbeing workers
who support families with children between the ages of 5-18. We support over 170
families in North Ayrshire, with sessions provided within the family’s homes, within
our offices, community buildings, and schools. We seek to build on existing parenting
capacity and provide practical support, advice, and guidance that will enhance family
wellbeing and relationships.  This approach allows us to ensure that 85% of families
receiving support require no further interventions following this support.
The team use the facilities in Meadowcroft to bake/cook with our families, giving
them an opportunity to connect, bond and learn life skills that can have a positive
impact on their wellbeing and finances. We use the garden to develop play-based
skills and to encourage positive mental health and wellbeing.
Over the summer, the team devised and facilitated a summer programme that ran
twice a week for the full summer for our families. They utilised accessible community
resources in every area (for example, Fairlie beach, low green Irvine, Dalry Park,
Eglinton Park, Ardeer Beach) and did free activities for our families to help build their
confidence and show parents and carers how to access outdoor activities that will
have a positive impact on their physical and emotional health. It also encouraged
297

Page 298

14 
families to access local community resources and build further contacts within the
community, reducing the impact of social isolation.
Child Protection Registrations
In 2024 to 2025 there were 156 Child Protection registrations and 178 De-
registrations. The greatest number of registrations were found in September, when
there were 22 registrations within the month. The lowest number of registrations
occurred in November, when there were 5 registrations within the month. The
median number of registrations per month across the year was 12.5. 
Breastfeeding
Breastfeeding rates - the published data for 2023 to 2024 has shown the following
improvements in breastfeeding indicators from an NHS Ayrshire and Arran
perspective:
Indicator 2022/2023 2023/2024
% breastfeeding at initiation 54.6 57.6
% exclusive breastfeeding at first HV contact
(10-14 days)
27.4 30.5
% exclusive breastfeeding at 6–8-week HV
assessment
22.8 25.6 
Similarly, the published data for 2023 to 2024 has shown the following improvements
in breastfeeding indicators from a North Ayrshire perspective: 
298

Page 299

15 
Indicator 2022/2023 2023/2024 Variance
% breastfeeding at initiation 53.0 59.6 6.6%
increase
% exclusive breastfeeding at first HV
contact (10-14 days)
23.2 30.5 7.3%
increase
% exclusive breastfeeding at 6–8-
week HV assessment
20.3 25.6 5.3%
increase
The benefits of breastfeeding on the short and long-term health of mothers and
babies have been well documented. It promotes optimum nutrition, growth and
development for babies, as well as providing comfort and protection from infections.
As such, breastfeeding is actively promoted and supported in a wide range of
settings across North Ayrshire and Arran.
North Ayrshire Health and Social Care Partnership’s Children and Families Health
Team has prioritised investment in infant feeding support through local health visiting
teams, as well expanding the Scottish Government’s Breastfeeding Friendly
Scotland (BFS) scheme in North Ayrshire and providing additional specialist support
for families with more complex feeding issues via the Community Infant Feeding
Team.
United Nation’s Convention on the Rights of the Child
This year, the United Nation’s Convention on the Rights of the Child (UNCRC)
was fully incorporated into Scots Law - The Children and Young People's
Commissioner Scotland.
The UNCRC articles provide for every aspect of a child’s life from birth up to the age
of 18 years. Guidance around UNCRC is clear that incorporation and adherence to
UNCRC is the responsibility of all public sector organisations and services, including
those services viewed as “adult services.”
To support our work within the HSCP, it was seen as critical to establish a baseline
of understanding and preparedness for implementation across all services. As such,
in November 2024, using the Improvement Service’s Getting Ready for UNCRC
Incorporation Framework document, a benchmarking document was developed with
an ask that all services within the HSCP complete to the best of their ability. 
Responses provided related to current practice within each service. Results have
been shared with all services. Moving forward each service will use the
benchmarking exercise to identify compliance and any areas that require special
attention to ensure implementation. 
299

Page 300

16 
Child Healthy Weight 
Child healthy weight is a public health priority. Over the last three decades, obesity
levels in children and, indeed, the wider population have increased, with inequalities
observed across our communities. Maintaining a healthy weight throughout
childhood is associated with many health benefits both in the short-term and the
medium term. 
Child healthy weight is monitored throughout the universal Health Visiting pathway
but also when a child moves into Primary 1. The most recent data for 2023 to 2024
was released in December 2024. For North Ayrshire:
• 74.8% of P1 children were of a healthy weight.
• 12.4% of P1 children were at risk of overweight.
• 11.9% of P1 children were at risk of obesity. 
Health Visiting
The Health Visiting service in North Ayrshire continues to fully implement the
national Universal Health Visiting Pathway, with all children under 5 and their
families offered a minimum of 11 visits from the ante-natal period through to the child
starting school. Developmental assessments are undertaken at 13-15 months; 27-30
months and 4-5 years. Since 2020, the percentage of children with one or more
developmental concern at these assessments has increased as shown in the table
below:
A slight improvement in developmental concerns at the 27–30 month assessment
has been observed in the last twelve months but a significant increase in concerns at
the 4-year review have also been noted, as well as a slight increase in concerns at
the 13–15-month review.
300

Page 301

17 
This trend is not unique to North Ayrshire and the Scottish Government has set out
actions to attempt to address this nationally within the recently published Enhancing
the Delivery of the Health Visiting Service: Scotland’s Health Visiting Action Plan
2025-2035 (Scottish Government, 2025). Locally, we have undertaken a review of
our Early Years Support Team and have established closer working relationships
with early years education colleagues to take forward a programme of work that
includes improved information sharing about developmental concerns at an earlier
stage; enhanced links between the HV service and early years establishments; a
focus on communication needs in children as a priority within our Getting it Right for
Every Child (GIRFEC) Steering Group; and shared work around supporting more
children to be toilet ready in the early years. 
Our Early Years Support Team works alongside the Health Visiting team to provide
support to families when developmental concerns are identified or when a family
requests additional support in other areas. During 2024 to 2025, 933 children and
their families were supported, an increase of 10.3% from 2023 to 2024, in areas
such as communication, sleep, toileting, home conditions, parental mental health
and routines.
During 2024 to 2025 we expanded our partnership with national charity Dads Rock
to bring a second dads’ worker to the area. This has allowed us to offer 1-1 and
group support to dads in the Irvine and Kilwinning areas, as well as the original
Three Towns area. During 2024 to 2025, 53 dads have been supported with 81
children being positively impacted.
Child to Adult Disability Transitions
Prior to commencing an active role with the children with a disability team, a baseline
of current functioning was obtained. The qualitative data for baseline was obtained
through staff caseload reviews this included reviewing assessments and care plans,
in addition to case notes held within CareFirst. This evidenced that current supports
available to children, young people and their families is not sufficient in providing
301

Page 302

18 
adequate support. The supports available are mainly social supports and residential
respite. Although these supports offer families a short break from their caring
responsibility, it is not fully addressing issues in relation to daily management of
personal care and behaviours that challenge, leading to carer burnout and young
people reaching crisis.
Further findings of the service review found that current transition planning has
become a process driven activity. Factors impacting transition planning include late
referrals to Transition Planning Group (TPG) and an inability to screen/allocate staff
in adult social work teams to screen referrals and/or allocate workers for
assessments, leading to a tick-box exercise when completed. This approach
ultimately has a negative impact on a young person's transition, with often late
and/or rushed assessment and resource allocation. Current processes are not
undertaken in a person-centred manner.
In order for young people to thrive as they transition to adulthood, the following was
identified:
• Assessment and case note training for staff.
• Outcome and Goal Setting training for staff.
• Review eligibility criteria for children and adult social work.
• Collaborative work with our partner agencies to promote skill generalisation
between school, community supports and respite for better outcomes for
young people.
• Personal Care needs to be addressed to support families in the day-to-day
care of children and young people with disabilities, through a Care at Home
type service. This is multifaceted in relation to relieving carer burnout and also
developing and promoting independent life skills in young people, which will
support their transition to adulthood.
• Proactive use of legislative measures to ensure children and young people
are protected.
• Review TPG and its Terms of Reference to return to a person-centred
decision-making forum. 
• Referral screening processes to be developed.
• Increased joint working from the age of 14-years from adult social work to
provide advice and guidance.
• Review age restrictions in children and adult social work to allow transitions to
happen at the right time, between ages 16-years and 21-years.
• Review of resource allocation processes for a more standardised approach.
302

Page 303

19 
Key Performance Indicators
Child Protection 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Child Protection Concerns 849 885 756 570 361 444
Child Protection Investigations
(CP1s) 447 443 432 375 197 421
Child Protection Initial
Conferences 123 121 119 76 83 170
Pre – Birth Conferences  41 29 34 17 22 14
CP Initial/Pre-Birth Conferences  4 7 4 9 1 10 
Looked after Children 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Children newly accommodated in North Ayrshire 84 63 49 61 46 52 
** Where the number of children accommodated = the number of children either admitted into any placement type except “At Home
with Parents”/”With Friends/Relatives” OR moved from “At Home with Parents”/”With Friends/Relatives” to any other placement
type  
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Foster Carers  98 103 99 96 105 107 
303

Page 304

20 
Permanency Planning 2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Number of permanency plans approved 30 10 21 19 15 6
Adoption – approved and placed  3 8 5 7 4 2
Adoptions granted 8 4 5 5 7 5
Permanence orders approved  11 3 7 7 7 6
Permanence orders granted 8 0 1 2 9 2 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Children Subject to Compulsory Supervision Orders 393 351 342 298 271 258 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Children with Compulsory Supervision Orders Terminated 140 102 101 102 117 69 
Emergency Placements  
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Child Protection
Orders  32 39 11 18 14 22 
Secure Placements  
2019–20 2020–21  2021–22  2022-23 2023-24 2024-25
Number of secure
placements 4 1 2 0 2 3
304

Page 305

21 
Justice Services  
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Number of reports submitted to the courts
(CJSW reports, Section 203, Short Notice
CJSW & Supplementary CJSW)
763 430 606 606  668 707
Number of home leave and background reports
submitted 
151 (66
leave
reports, 85
background
reports)
114 (39
leave
reports, 75
background
reports)
93 (30 leave
reports, 63
background
reports)
91 (28 leave
reports, 63
background
reports)
112 (41
leave
reports, 71
background
reports)
112 (42
leave
reports, 32
background
reports 38
TARL)
Unpaid Work Requirements 360 94 172 313  310 329 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Level 1 Mappa  163 152 172 190 174 188
Level 2 Mappa  7 10 14 27 11 13
Level 3 Mappa  5 3 7 2 2 1
305

Page 306

22 
2.2  Adults
North Ayrshire Drug and Alcohol Service 
The North Ayrshire Drug and Alcohol Service (NADARS) has continued to
demonstrate high levels of performance by meeting national and local standards and
targets, such as access to treatment waiting times, provision of alcohol brief interventions
(ABIs), the roll-out of Naloxone supplies and increasing patient choice regarding Opiate
Substitution Therapy (OST) medications.
Figures for those seen within 3 weeks for Alcohol were no lower than 96% during any
quarter, while those seen within 3 weeks for Drugs were no lower than 99% during any
quarter in 2024 to 2025. 100% of referrals for Alcohol and Drugs were seen within 6
weeks. 
The team continues to identify new ways of working to provide a more agile and
streamlined service and further improve performance. This work has been evidenced by
306

Page 307

23 
the delivery of early intervention services in the delivery of Alcohol Brief Interventions
(ABI) in both priority (Primary Care, A&E and Antenatal) and wider settings.   
North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation (eICT)
The North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation
(eICT) utilises multidisciplinary holistic interventions to focus on providing high-quality
care and support, through proactive early intervention and preventative action. They aim
to assist patients presenting with falls, frailty, low grade infections and general functional
decline to avoid hospital admission where possible and facilitating early discharge home
from hospitals. 
2022-23 2023-24 2024-25
Target set by Scottish Government – Priority Settings  3,420 3,420 3,420
Total ABI delivery in Priority Settings (Ayrshire & Arran) 4,933 6,398 5,940
Indicator 2022-23 2023-24 2024-25
Target set by Scottish Government in Wider Settings  855 855 855
Total ABI delivery in Wider Settings (Ayrshire & Arran) 1,207 1,216 1,325
307

Page 308

24 
The North Ayrshire Enhanced Intermediate Care Team brings together the expertise of
dedicated Physiotherapists, Occupational Therapists, Technical Instructors, Dieticians,
Community Psychiatric Nurses, Pharmacists, Admin workers, Rehabilitation Nurses,
Advanced Nurse Practitioners, and Intermediate Care GP with special interest into one
single multidisciplinary and interdisciplinary team; focused on problem-solving for
patients in their own homes across all of mainland North Ayrshire. The seven-day
rehabilitation service facilitates early discharge from hospital and provides a rapid
alternative to acute hospital admissions. The Enhanced part of the team addresses
medical and clinical issues that limit a patient’s ability to engage in rehabilitation via a
shared care model with the patients registered GP. 
Anam Cara Refurbishment
Support for people with dementia in North Ayrshire received a boost after Anam Cara
respite centre in Kilbirnie was officially reopened with a ribbon-cutting ceremony on
Tuesday 4th June following an extensive refurbishment project.
The specialist dementia respite centre accommodates up to 9 guests aged 60 years or
over, offering critical respite services
within single room, en-suite
accommodation. The support service,
which is run by North Ayrshire Health
and Social Care Partnership, had been
temporarily relocated to the vacant
Taigh Mor site in Beith to allow the
service to continue while works were
carried out.
The refurbishment project included a
complete transformation of the main
garden area, including new garden
furniture, with a ramp installed from the
308

Page 309

25 
conservatory to allow better access for guests to enjoy the outdoors. An additional,
smaller garden area adjacent to the dining area has also had some landscaping
improvements made. 
A full revamp of the internal areas of the building has also been carried out, with works
including wet wall installation in several of the bathrooms, replacement light fittings with
energy-efficient LED bulbs and a full upgrade to the reception area. An archway has
been created within the dining area to improve the space, allow better access to the
outdoors and create an improved flow for staff moving around the area, and a new boiler
and generator have been installed.
309

Page 310

26 
Mental Health Facility
NHS Ayrshire & Arran has officially opened a new, nurse-led Mental Health Unscheduled
Care Assessment Hub. Recognised as the first of its kind in Scotland, the hub aims to
deliver a new model of care.
The Mental Health Unscheduled Care Assessment Hub, based at Woodland View in
Irvine, provides a patient-focused, therapeutic space to support the delivery of
compassionate care to those individuals with acute mental illness who would be eligible
to access an adult acute mental health bed for ongoing intensive assessment.
Managed and coordinated by the Mental Health
Unscheduled Care Service, the hub provides 24-hour
access to mental health assessment and interventions. The
service is delivered by experienced Registered Mental
Health Nurses within a therapeutic environment for a period
of up to 72 hours and will be able to accommodate up to five
patients. 
North Ayrshire Health & Social Care Director, Caroline
Cameron explained, “We are delighted to be able to officially
open this new service.
“We piloted the hub earlier this year for a small number of
patients. We are now ready to open at full capacity and provide those living in Ayrshire
and who are experiencing acute mental illness with this new way of working.”
The hub aims to:
• improve the patient journey through the Mental Health Unscheduled Care Service.
• facilitate closer working and a smoother patient journey between community and
inpatient services.
• reduce the number of unscheduled admissions to acute adult inpatient mental
health beds.
• reduce the waiting time for planned adult acute admissions.
• reduce the number of initial assessments carried out in acute wards releasing
resource for treatment.
• provide training opportunities in assessment of mental illness for clinical staff. 
310

Page 311

27 
Trindlemoss Day Opportunities
Trindlemoss Day Opportunities in Irvine has been praised in a report by the Care
Inspectorate after an unannounced inspection visit in October, with the majority of areas
looked into being rated as ‘very good’ by the national regulatory body.
The service, which opened in 2020, provides tailored support for over 100 people with
learning disabilities from its base in Tarryholme Drive in Irvine.
The inspector identified a number of significant strengths within the service, with
customers found to be ‘supported in stable groups by consistent staff who know them
well’. The ‘warm, respectful and kind interactions between staff and people supported’
were also highlighted in the report. 
Support was found to be tailored to each individual’s identified outcomes, with the service
maintaining a flexible approach that allows customers to access a range of groups and
activities of their choice. Regular project topics also provide multiple opportunities for
themed activities and trips to associated places. 
Health promotion and education is
integrated into activities,
empowering people to take
control of their health and
wellbeing, with the service also
making use of local facilities such
as the swimming pool and gym.
These trips also provide a chance
to enhance travel and life skills.
Trindlemoss Day Opportunities
was also praised for its strong
links to the local community, providing support for lunch clubs, play groups and dementia
support groups, as well as assisting with gardening and litter picking.
Additionally, the Baristamoss Café is open to the local community several days a week,
providing employment training and boosting the development of social skills for those
supported.
In terms of staffing, employees were described as enthusiastic and knowledgeable,
putting customers at the centre of all they do. Staff reported that they were able to spend
quality time with individuals and get to know them well, and support was found to be
provided in a timely manner. Good relationships were noted between staff and
management, with appropriate checks and audits in place for the service type.
The Trindlemoss facility was commended for being clean and well maintained, offering a
generous amount of space split into zones allowing multiple activities to take place at the
same time. The gardens were described as ‘well maintained’ and used for a number of
activities - including growing vegetables - and areas such as the training kitchen and
laundry area provide important socialisation and life skill development opportunities.
311

Page 312

28 
Out of Hours Social Work Service 
Date Period North Ayrshire  South Ayrshire East Ayrshire Total 
2020-2021 4165 2337 2800 9302
2021-2022 4000 2202 2613 8815
2022-2023 3185 1783 2366 7334
2023-2024 3832 2103 3159 9094
2024-2025 3935 2167 3353 9455 
These figures do not include the calls taken which did not result in a referral being made
to day services. 
Self-Directed Support 
Self-Directed Support (SDS): For the reporting year 2024 to 2025, the following
information indicates how people have arranged and directed their support in North
Ayrshire.
Self-Directed Support offers four options. These are:
• Option 1 – a direct payment, which is a payment to you or third party to pay
for your own support
• Option 2 – you direct the available support
• Option 3 – the local council arranges the support
• Option 4 – a mix of the above
0
50
100
150
200
250
300
350
400
Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25
AOOH Referrals
NAC SAC EAC
312

Page 313

29 
This continues to demonstrate that traditional support options are offered and accessed
most with 80% of people receiving Option 3, where little choice and control is exercised
and support is chosen, arranged and directed by the Health and Social Care Partnership.
Care at Home
Our first annual Care at Home Manager Development Day has taken place. This was
introduced as a practical support for new and existing managers to enhance both
confidence and skills, focusing on key areas such as:
1. Skill enhancement: Managers should continually develop their skills to keep up with
best practices.
2. Leadership Improvement: Effective leadership is essential for the managers to
motivate and guide their team.
3. Employee Development: Managers play a key role in the growth of their Care at
Home Teams, by improving their mentoring, coaching and feedback skills they can
better support the Carers whom they line manage. 
4. Networking: The development days enable the managers to share experiences and
learn from their peers. 
5. Wellbeing: Investing in the development of managers supports their wellbeing.
The service will continue to support future sessions, engaging in new concepts,
continuing to drive success and growth which also supports career progression. 
Care at Home Recruitment: Family Participation
Our care at home team remains dedicated to involving service users and their families in
recruitment events. Family members can drop into these events, meet the team, and
discuss the care provided to their loved ones. During these sessions, the team has
received appreciation from families for their compassionate care and efforts to address
any concerns. This feedback highlights the team's commitment to delivering high-quality,
empathetic care as well as to ensuring that families feel empowered to discuss their
concerns openly and fully. 
313

Page 314

30 
Carers
North Ayrshire Council and Carers Gateway North Ayrshire have signed up to a new UK-
wide commitment aimed at improving the lives of young carers and young adult carers,
with NAC leading the way by being the first local authority in Scotland to sign up for this
important initiative.
The Young Carers Covenant was launched by the Carers Trust and the Young Carers
Alliance, setting out a series of outcomes for
organisations to work towards to ensure the
life chances of young carers are improved. 
Caring can have a serious impact on a young
person’s education and long-term future, with
many young carers missing out on important
parts of their childhood. This means it is
vitally important that they receive the right
support at the right time to enable to them to
continue in a caring role while being a child
or young person first. 
By signing up to the Young Carers Covenant, North Ayrshire Council and its partner
Carers Gateway North Ayrshire have made the commitment to work towards ten key
outcomes that will improve life chances for young carers, ensuring they are identified at
the earliest opportunity, receive timely support, are able to thrive in education and
employment, have time for themselves, and are able to maintain good physical health
and wellbeing.
This will involve continuing to work with education services, including colleges and
universities, to ensure staff and students know who young carers are, the effects of
caring roles and how to identify and support them.  
314

Page 315

31 
2.3 Criminal Justice 
Multi Agency Public Protection Arrangements (MAPPA) 
The Multi Agency Public Protection Arrangements (MAPPA) are a set of statutory
arrangements that allow for the assessment and management of the risk posed by
people convicted of certain sexual and violent offences. In Scotland, arrangements were
established by Sections 10 and 11 of the Management of offender’s etc. Scotland act
2005 and became operational in 2007. MAPPA brings together the Police, Local
Authority Social Work Justice Services, the NHS and Prison Service. In addition, some
other agencies are under a duty to co-operate with the Responsible Authority in respect
to the arrangements. These include, local authority housing, the Reporter to the
children’s panel, certain registered social landlords and electronic monitoring providers.
The creation of an effective Risk Management Plan is the key factor in the MAPPA
process. To support staff in this critical task, on 19th and 20th of June 2024, subject
matter experts from the Risk Management Authority Scotland , provided training on the
best ways to approach this task. The training was attended by over fifty members of staff
from both the Police and Justice Services.
As a result of the training there has been an immediate improvement in the quality of the
important foundation documents produced by Justice social workers with positive
feedback received “Your Risk Management Plan was first class, comprehensively
detailing the risk factors and the plans in place to mitigate risk and throughout the
MAPPA meeting, your role in working with Mr A and the therapeutic relationship you
have with him was highlighted by every other service”.
Community Payback Orders
The latest Government statistics on Community Payback Orders (CPOs) (2023 to
2024) show that North Ayrshire had the highest of the Ayrshires with 479 CPOs which
equates to 52.5 per 10,000 population.The Scottish average is 39.1 per 10,000
population.
There has been a reduction in the number of Criminal Justice Social Work Reports
(CJSW) since 2020 to 2021 largely thought to be due to the result of COVID-19. 2024 to
2025 sees the highest number of report submissions since this downward turn, albeit not
yet at pre-covid numbers. The latest Government statistics on CJSWs for 2023 to 2024
reveal North Ayrshire to have submitted the highest number of reports of the Ayrshires.
Our Justice Services continue to have a positive impact on the local community through
the Community Payback Order (CPO) unpaid work scheme. For the twelfth year we
continue to over-achieved against targets for CPO level 1 and level 2. 2024 to 2025 saw
78 out of 79 level 1 CPO’s completing within timescales and 108 out of 112 level 2
CPO’s completing within timescales. The targets set for unpaid work are pan-Ayrshire
targets.
315

Page 316

32 
Drug Treatment and Testing Order 
There was a marked increase in in Drug Treatment and Testing Order (DTTO)
Assessment and Impositions in 2023 to 2024. There has been a slight decrease in 2024
to 2025; however, the volume of assessments and new Orders this year remains high.
The last two years figures appear to represent a return to ‘the norm’ following a ‘dip’
attributed to covid. 
Of the 63 assessments completed in 2024 to 2025, 45 new DTTO’s were imposed
across Ayrshire. This incorporates Orders from both Kilmarnock and Ayr Sheriff Courts.
DTTO is an intense Order which involves monthly Court reviews, twice weekly contact for
the first month and weekly oral drug screens. There are three distinct roles within the
team delivering the service and interventions. The Supervising Officer oversees the
Order, monitors compliance and compiles the assessment and review reports. The
Additions Worker delivers the therapeutic interventions and is primarily responsible for
administering the oral drug screens. There are then Recovery Development Workers
who provide practical supports, assistance with welfare needs and also build links and
connections within the recovery community to help build the persons own recovery
capital.
A Recovery Care Plan is created with each individual. There are ten domains, including
substance use, relationships and offending, which are scored from 1 to 10. These plans
are updated at three monthly intervals and allows areas for support/intervention to be
identified and progress to be monitored.
316

Page 317

33 
Diversion from Prosecution
Diversion from Prosecution (Diversion) has been available since 1997, within this
past year we have experienced a further increase across Ayrshire in assessment
referrals from the Procurator Fiscal. Referrals have increased at a significant rate from
2018. Although this disposal is early intervention and low-level offending, the presenting
need of service users is extremely high, thus resulting in more staff time being allocated
and closer partnership working with other agencies to provide identified services. 
The number of assessment reports submitted are relatively lower than the number
requested due to limited resources, which has resulted in waiting lists within each local
authority area. 
In comparison with last year, 2023 to 2024 notes a decrease in the number of Diversion
cases imposed. This is due to delays from the time that the offence was committed until
the individual is referred to and assessed by the Diversion team. In this time many
positive changes could have taken place and individuals are actively seeking and
engaging with services to address any issues which they may have, thus reducing their
risk of further offending. In these instances, no interventions are required due to positive
reasons. 
317

Page 318

34 
Case Study: Employability Mentors
Employment can contribute significantly towards desistance and the development
of a pro-social lifestyle for service users involved in the Justice system. People
released from prison without a job are twice as likely to re-offend as those
released with employment opportunities lined up.
People with convictions may also face stigma and inequality associated with
declaring a criminal record, or an unwillingness by some employers to provide
those with criminal convictions with job opportunities. The Employability Mentors
located within our Unpaid Work team assist service users involved with the Justice
system to obtain skills that will enable them to gain employment and training
opportunities to support reintegration into the community.
The impact of the work of our Employability Mentors is reflected in J’s story.
J's Story
This is the story of J, who overcame significant personal and professional
challenges to rebuild his life. J's journey from a tumultuous background to a
promising future is a testament to resilience, support, and determination.
Following a court order that mandated 18 months of social work supervision and
180 hours of unpaid work, his life took a difficult turn. This period marked the
beginning of numerous challenges, including poor physical and mental health,
which necessitated additional support from various departments, including
addiction services.
Employment History
J had a career in His Majesty's Armed Forces but was discharged due to physical
and mental health issues. During this time, he picked up charges before
transitioning to roles in security and as a bus driver. However, J’s health issues
impacted on his ability to sustain employment. J was referred by his Community
Payback Officer (CPO) to the Employability Mentor service to help him reassess
and explore his employability options.
The Employability Mentor Service is a dedicated one-to-one service for individuals
who are involved with Justice Service to identify further education, training,
volunteering and employment. By tackling the additional barriers service users
face, by being involved with the Justice Service, the employability mentors are
able to realistically provide support to reach long lasting positive destinations.
The CPO Employability Mentor Service offers people information, advice and
guidance on disclosure related issues. This includes helping people understand
their rights when disclosing an offence, how restrictions can affect their job hunting
or how to reskill into a new career.
The Challenge
Due to his offence, J was forced to reskill and seek new employment
opportunities. His physical and mental health further complicated his ability to find
318

Page 319

35 
and maintain stable employment. Despite these setbacks, J was determined to
improve his situation and with the support of the Employability Mentor sought a
new career path, enrolling in courses through the Open University and other
training programs.
Financial Assistance
Addressing financial barriers was crucial. Assistance with fuel costs, support from
Money Matters and access to food banks provided J with stability and a
foundation to start anew.
Health and Wellbeing
Continuous support from health services helped improve J's physical and mental
health, enabling him to focus on his future.
Achievements and Progress
While pursuing his studies and with ongoing intervention from the Employability
Mentor J actively searched for employment and secured a part-time job as a bus
driver. This role not only provided financial stability but also boosted his
confidence and well-being. With his health improving and life stabilizing, J is now
on a more promising path. As his situation improves, J is more motivated and has
started studying IT.
Conclusion
J's story is a powerful example of how targeted support and personal
determination can overcome even the most daunting challenges. J’s s progress in
both his job and health highlights the importance of comprehensive joined up
support systems in facilitating successful rehabilitation and career transitions.
It also evidence that access to employment with a criminal history is still possible. 
319

Page 320

36 
Key Performance Indicators
MHO Service
Mental Health (Care and
Treatments) 2003 2018–19 2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
Emergency Detentions 54 54 81 96 92 99 121 
Short Term Detentions 74 67 134
There has
been a total
of 171
requests (of
which
consent
was given
to 134, with
the other
37 being
assessed
but consent
not given)
There has
been a total
of 127
requests (of
which
consent
was given
to 108, with
the other
19 being
assessed
but consent
not given) 
There has
been a total
of 182
requests (of
which
consent
was given
to 151, with
the other
31 being
assessed
and
consent not
given)  
There has
been a total
of 202
requests (of
which
consent
was given
to 170, with
the other
32 being
assessed
and
consent not
given)
320

Page 321

37 
Compulsory Treatment 38 51 59
There has
been a total
of 70 new
CTOs
granted (of
which 27
had been
Interim
CTOs, with
14 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal)
There has
been a total
of 60 new
CTOs
granted (of
which 17
had been
Interim
CTOs, with
12 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal)
There has
been a total
of 47 new
CTOs
granted (of
which 10
had been
Interim
CTOs, with
4 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal) 
There has
been a total
of 60 new
CTOs
granted (of
which 24
had been
Interim
CTOs, with
18 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal) 
Warrants Undertaken 1 6 6 4 4 3 2 
Criminal Justice Act Scotland 1995 2018–19 2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
Compulsion Order and Restriction Order 4 3 3 2 0 0 0
Compulsion Orders 2 6 6 3 3 3  6 
Hospital Directions 1 1 1 0 0 0 0
Assessment Orders 2 2 2 6 5 6  4 
Treatment Orders 4 2 2 6 2 3  4 
Transfer for Treatment  2 1 3 1 1 1  1 
321

Page 322

38 
Adults with Incapacity Act (Scotland) 2000 2018–19 2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
Private Welfare Guardianships 411 (58
new)
272 (67
new)
314 (57
new)
402 (102
new)
371 (99
new) 
422 (125
new)
450 (63
new) 
CSWO Guardianships  40 (16
new) 64 (24) 71 (24) 91 (26) 85 (27
new)
121 (54
new)
151 (40
new) 
Financial Intervention Order (LAG) 26 31 n/a  n/a  n/a  n/a n/a 
MHO Report PWG Application  38 104 75 156 139 141  101 
Adult Protection  
2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
ASP Referrals (AP1) 568 558 643 722 915 1092
ASP Investigations (AP2) 108 132 102 72 112 100
ASP Case Conferences  66 64 40 41 57 43
Protection Orders 0 3 1 0 1 0
Adult Concern Reports  2335 2215 2070 2370 2103 2538
322

Page 323

39 
3. Resources 
3.1 Financial Pressures 
The IJB set a balanced budget for 2024/25 on 14th March 2024. This did not require any
draw on reserves but did include the approval of £10.290m of savings to achieve financial
balance.
Financial information is part of the performance management framework with regular
reporting of financial performance to the IJB. This included an integrated approach to
financial monitoring, reporting on progress with savings delivery, financial risks and any
variations and changes to the delegated budget. 
Financial balance was not been achieved in 2024-25 and the 2025-26 budget highlights
several areas of significant risk. Financial modelling also anticipates a very challenging
position in subsequent years. 
From the initial budget monitoring report in month 3 the projected position was an
overspend. The Integration Scheme requires the preparation of a recovery plan if an
overspend position is being projected to plan to bring overall service delivery back into
line with the available resource. The IJB agreed some initial recovery actions at the
meeting in June 2024 and a more detailed financial recovery plan was developed and
approved by the August 2024 IJB.
Since the initial recovery plan was agreed in June 2024 there was a £4.002m reduction in
costs.
Despite this, against the full-year budget of £326.629m there is a reported overspend of
£1.212m pre-earmarking. After earmarking the overspend of £3.593m consists of an
overspend of £2.036m in social care services and an overspend of £1.557m in health
services. Following additional funding contributions this position was brought on-line.
There were significant financial challenges during the period. The main challenges during
the year were residential placements for children, care at home, supplementary staff in
wards and Unplanned Activities (UnPACs) within the lead partnership for mental health.
3.1  2025-26 Budget
As part of the Scottish Government budget and finance settlement funding letters were
issued to NHS Boards and Councils, these detailed the requirements in relation to the
level of funding to be delegated to IJBs in 2025-26.
The specific requirements and funding provision is as follows:
NHS Ayrshire and Arran
• NHS Ayrshire and Arran are required to passport the 3% through to IJBs
(£4.040m to North Ayrshire) – “In 2025-26, NHS payments to Integration
Authorities (IA) for delegated health functions must pass on an uplift of 3% over
2024-25 agreed recurring budgets.” 
323

Page 324

40 
• Additionally, there is funding of £150m nationally for Agenda for Change Pay
Reform. A share of this funding will be allocated to the IJB to meet the associated
costs for NHS staff. This is being followed to ensure the correct roll-forward into
2025-26 and it is anticipated at this stage that the costs of the pay reform will be
fully funded. 
• Moving into 2025-26, brokerage will no longer be available to NHS Boards and all
Boards must work towards break-even. Should financial balance not be achieved
this would be shown as an overspend in financial statements, leading to potential
qualification of accounts and Section 22 report, as well as consideration of
escalation status.
• The NHS budget includes a commitment of additional funding to reduce waiting
lists and to help support reduction of delayed discharge; as well as a commitment
to renew primary care enhancements, including new core funding to GMS to
deliver enhanced frailty, cardiovascular disease and other essential services in
General Practice, a critical dental workforce and training package and a
community eye care programme to transfer patients from waiting lists. Further
details of the allocation of funding is to follow but a submission from NHS AA
incorporates the request for funding from North Ayrshire IJB and this was
submitted to the Scottish Government early March 2025.
• Similarly to Local Government NHS Boards have also been advised to plan on the
assumption of 60% funding for the Employers National Insurance Increase.
North Ayrshire Council 
• Based on the 2025-26 Finance Settlement the Health and Social Care Portfolio
will transfer additional funding of £140 million to Local Government to support
social care and integration for 2025-26.
• The funding allocated to Integration Authorities should be additional and not
substitutional to each Council’s 2024-25 recurring budgets for services delegated
to IAs and therefore, Local Authority social care budgets for allocation to IAs must
be at least £140 million greater than 2024-25 recurring budgets.
• The increase in Employers National Insurance from April 2025 has not been fully
funded for the public sector in Scotland and has created a significant financial
pressure. For Local Government funding of around 60% of the cost will be
provided by Scottish Government for directly employed staff. There is zero funding
being provided for any commissioned services.
• Specific funding for the IJB was received for the following areas:
• Real Living Wage   
• Free Personal and Nursing Care 
324

Page 325

41 
• Additionally, North Ayrshire Council have passed through a share of the Local
Government Grant uplift of £2.114m and have fully funded the increase in
Employers’ NI costs of £1.898m for NAC contracted staff. previous years and were
already assumed in the Partnership base budget and this is shown in the table
below.
Moving into 2025-26 the Partnership is proactively working to provide safe and effective
services for the residents of North Ayrshire within the financial envelope, this is
supported by approving a balanced budget. The IJB approved a one-year balanced
budget for 2025-26 on 20 March 2025. More information about the budget can be found
here - 25-26 Budget
This budget included new budget pressures for health and social care services totalling
£14.943m. These were developed in partnership, with Finance supporting front line
services to identify current and emerging financial pressures considering historic demand
and costs and potential future variations. The provision of funding for pressures has the
impact of increasing the budget gap to be addressed through savings, therefore the
pressures are only included in budget plans where these are absolutely unavoidable.
The new cost and demand pressures resulted in a requirement to identify and approve
additional savings of £4.019m
3.3 Financial Planning
Strong financial planning and management is paramount to ensure our limited resources
are targeted to maximise the contribution to our objectives. Delivery of services in the
same way is not financially sustainable. The updated strategic plan approved for 2022-30
is underpinned by the need to learn from the pandemic and ensure opportunities are
maximised to transform care models and find new solutions to ensure the future
sustainability of high-quality heath and care services. 
The ability to plan based on the totality of resources across the health and care system to
meet the needs of local people is one of the hallmarks of integrated care. Medium term
financial planning is key to supporting this process and identifying the transformation and
planned shift in resources to provide sustainable services to the local community over the
medium term. 
The IJB has a strong reputation in delivering savings. The IJB will continue to pursue
transformational change in how it supports individuals, families and communities to live
independently from statutory services for as long as they can safely do so. This is not just
about changing the ways in which services are structured but will require a change in
how they are planned and delivered.
Our health and social care services should reflect and respond to the needs of local
people. To support this, we will help to build greater capacity in our communities and
provide more ways for service users and local people to share their views with us to help
shape services. We are fully committed to planning and designing services together with
local people, our staff and our key partners including acute health services, housing,
community planning and the third and independent sectors.
325

Page 326

42 
The IJB, through the Strategic Plan, outlines the belief that together we can transform
health and social care services to achieve the joint vision for the future “all people who
live in North Ayrshire are able to have a safe, healthy and active life.” Moving into 2025-
26, we are working proactively to address the financial challenges, while at the same
time, providing high-quality and sustainable health and social care services for the
communities in North Ayrshire.
3.4 Medium Term Financial Outlook 
A Medium-Term Financial Outlook (MTFO) is a critical part of the strategic planning
process. The financial context for public services remains very challenging and so it is
vital that the IJB’s strategic ambitions are set against the financial resources which are
anticipated to be available.
The MTFO provides key information on the possible financial position of the IJB over
future years. It identifies the financial challenges which will be faced by the IJB enabling
the IJB to see the impact of current and future decisions on its medium-term financial
health.
The MTFO will also be used to identify pressure points and inform decisions which are
required to ensure the Partnership remains financially sustainable.
There are a range of factors which influence the financial planning of the IJB. These are
considered through the MTFO and include the following:
• Demographic changes.
• Local priorities.
• Workforce challenges.
• The UK and Scottish Economy.
• Policy and Legislation.
• Cost and demand pressures.
• Available funding. 
As in previous years, a Medium-Term Financial Outlook has been prepared to identify
what the financial position may look like moving into 2026-27 and 2027-28.
The Integration Joint Board, in common with most Public Sector bodies, is facing a period
of significant financial challenge with cost and demand pressures. The most significant
financial pressures continue to be pay awards for staff, inflationary cost increases for
contracted services and demographic changes driving increased demand for services -
funding these unavoidable pressures year-on-year drives our savings requirement.
There are a number of highlighted financial risk areas that may impact on the 2025-26
budget during the year, these include:
326

Page 327

43 
These risks will be monitored during 2025-26 and the financial impact reported to the IJB.
The next three years will be the greatest financial challenge that the IJB has been asked
to manage since its inception. North Ayrshire IJB is clear about the challenges which are
ahead and its aspirations for its services, however we will also need to be realistic about
what can be delivered within the funding envelope available. Transformation alone will
not address the financial gap, and this will require the IJB to prioritise decisions for
investment and disinvestment in order to support delivery of the Strategic Plan. This will
result in some services being reduced or stopped altogether but this action is required to
ensure the available resource reaches those most at risk and in need of care and
support.  
Legacy Overspends Growing demand for
services
Provider market –cost
pressures and potential
market failure
Performance
expectations –Maintain
and Improve
SG Policy Commitments
not fully funded&
funding reducing or
ceasing
Wider system financial
challenges –NAC and
NHS
Meeting needs of
population –with rising
costs of care
NHS Reform priorities Zero Unearmarked
reserves
327

Page 328

44 
4. Workforce 
4.1 Workforce Planning
Following the implementation of the HSCP “Be the Best You Can Be” Learning &
Development Strategy (Social Work and Social Care) in September 2023 there has been
a clear indicator of the HSCP organisational offer and expectations in relation to
professional development for the social work and social care workforce. While the
strategy enters its third year it continues to outline our approach to articulating to our
practitioners how much we are investing in their development and aims to embed the
development of leadership and management capabilities. 
The issues in relation to professional staff sufficiency remain across all areas of social
work both locally and nationally.  The recent SSSC Annual Workforce Data Report shows
there was an increase of 23% in the social work workforce in NAHSCP. This is testament
to the implementation of the “Be the Best You can Be” Learning and development
Strategy 2023/28 which outlines the qualification pathways and annual development
offers to staff.
We can continue to offer annual sponsorship opportunities for the Undergraduate Social
Work Degree and “fast track” routes including the Post Graduate Diploma in Social work.
As a direct result of the “Growing Our Own” programme we have 9 employees
undertaking a social Work qualification and a further 4 employees who have completed a
social work qualification and will graduate in the autumn. This programme has seen 12
employees qualify as social workers.
To further support the “Growing Our Own” programme we have embarked on the journey
to create a NAHSCP Practice Education qualification through SQA and SSSC approval
processes this will ensure a sustainable, local and self-sufficient delivery method of the
qualification which will secure the pathway for development and social work students in
NAHSCP.
As part of the strategy and the Growing Our Own programme there is a visual pathway
which demonstrates from school leavers to senior levels what is on offer including the
opportunity to undertake an HNC in Social Services & Healthcare and 12 employees
were successful in the completion of this qualification earlier in the year and a further
offer has been disseminated to staff.
We are continuing to develop robust relationships and ways of working with Universities
in the West and the local Ayrshire College. Through these more direct ways of working
and collaboration we continue to explore the variety of degree level, post graduate and
post qualifications on offer and practice learning opportunities is one of our optimum
responsibilities.
Through such collaborations we have developed in partnership with Ayrshire Hospice an
enhanced approach to the quality of palliative care through comprehensive training
opportunities. This will support the increased number of citizens who choose to remain at
home in the final stages of life rather than in a clinical setting and equip social work and
social care staff with the knowledge and skills to provide compassionate care.
328

Page 329

45 
Our commitment to the provision of Mental Health Officers within the organisation is
another key component of the Learning & Development Strategy. Following the “pilot”
delivery of the mental health qualification from a different HEI where the aim was to offer
a more bespoke and flexible qualification with a local context we have 2 employees
nearing successful completion of this qualification and a further 2 sponsored on this
course for the next cohort.
The strategy seeks to strengthen the newly qualified first year for Social Workers in
cognisance of the directive from the implementation of SSSC Newly Qualified Workers
Supported Year. This is critical as the first year greatly influences professional autonomy
and authority which are key to good social work practice. With the introduction of
mentoring training and support for teams who will have NQSW’s and an offer to extend
our support to NQSW’s from 12 months to 18 months with a monthly planned programme
delivered by the social work practice team this will nourish new social workers. This
approach continues to be embedded after the initial implementation year and feedback
from a “deep dive” quality assurance exercise carried out by the SSSC highlighted
instances of “exceptional” examples of practice from our NQSW’s.
Leadership & Role Modelling has been seen as one of the key areas where managers
and supervisors can influence professional standards and practice and promote a
leadership culture. With Aspiring Leaders Programmes for aspiring/new managers and
Systems Management Programmes for senior managers these programmes offer
reflective space and coaching to allow practitioners to explore complex systems and
leadership at all levels within an organisation. Both courses have been delivered and
continue to demonstrate extremely successful outcomes in the development of a cross
section of practitioners. 
In relation to the key area of Good reflective Supervision outlined in the document
“Supervision Standards” have been developed following the ongoing work in relation to
supervision practice being undertaken by external consultant Bridget Rothwell. The
standards are contained in the “Be The Best You Can Be” Learning and Development
Strategy. The Supervision Standards outline expectations in relation to good reflective
supervision, values and conduct which can be used to develop bespoke service specific
supervision guidance and there is clear guidance around expectations and usefulness of
face to supervision provision. The strategy includes an overarching focus on the
wellbeing of the workforce and is included as a key component of the supervision
standards. Further input from Bridget will commence in the summer and will focus on
bespoke development support for frontline managers.
In relation to ongoing in house training we have been able to increase the number of
courses on offer by more than 100%. The variation of courses on offer has increased
following consultation with the workforce and driven by other national agendas including
Trauma Informed Practice. This has resulted in 417 practitioners attend the various offers
of Trauma Training since it was launched 9 months ago and a further 11 completing the
Professional Development Award which is an accredited qualification.
Our offer to the workforce for accredited qualifications has increased significantly with a
variety of Professional Development Awards including, Mental Health, Leadership and
Management and Supervision available. These offers enhance the knowledge and skill of
the workforce in both social work and social care and contributes the mandatory
requirements outlined by our regulatory bodies.
329

Page 330

46 
As the strategy continues to be embedded the “appetite” for development from the
workforce is evident with the participation at events and information sessions.
4.2 Workforce Support and Development 
As platinum award winners in Investors in People, the Dirrans team were looking for
a different challenge so went forward for a new award from Investors in people ‘We
invest in wellbeing.’ The We invest in wellbeing framework looks for a strategy and
approach to the health and wellbeing of staff. This should be measurable and understand
the impact of this on staff practice. The team considered and improved practice by
evaluating staff wellbeing through surveys and feedback. They created a wellbeing policy
and strategy to guide wellbeing goals such as reducing sickness absence, improving job
satisfaction and job retention. They also developed subgroups that focussed on physical,
psychological, social and financial factors that can affect staff and shared this as a team
to be more informed about what supports staff can access to help improve wellbeing. 
The team reflected that they already felt that they had a strong presence for looking after
staff however going through this process it highlighted areas for improvement and how
the framework could improve the
service. The We invest in Wellbeing
framework comprises three indicators,
each with three themes. This defines
what it takes to reach each level of
accreditation standard, silver, gold,
and platinum.
It was intended to start at the first level
of ‘standard’ however when receiving
feedback, this had jumped to silver
which is an amazing achievement, and
the Dirrans Centre were confirmed
winners of the silver award in August
2024.
We invest in wellbeing silver award
means that you have an established
wellbeing strategy or plan and that
your people feel positive about your strategy, plans and activities. Developing and
supporting our workforce ensures employees are more efficient and effective in their
roles, helps retain our skilled and qualified staffing resources, and improves morale and
job satisfaction.
The Health and Social Care Partnership are delighted to advise the launch of a formal
model of support for workers in the creation of a Staff Vicarious Trauma Service. The
Partnership recognises the secondary trauma, stress and burn out, which can occur
when working in a complex human environment with many moving parts. The purpose of
the venture is to support staff who are working within the live space, exposed to
complicated human contexts. 
The service will be delivered by Breaking The Silence, who have significant experience
and knowledge in this field and beyond, supporting victims of profound and vicarious
330

Page 331

47 
trauma. Staff will be able to access therapeutic support to work through the vicarious
trauma they have been exposed to. This will provide a safe space to process their
experiences, gain therapeutic insights/supports and build on their resilience to move
forward. Incorporating coping strategies, wellbeing plans with the purpose of helping staff
to continue work responsibilities without any detriment to their mental, emotional and
physical health and wellbeing, protecting them from, and reducing the risk of vicarious
trauma. 
The contract will also provide two wider workforce training days each year for
approximately 80 staff in total. The aim is to raise awareness of vicarious trauma per se -
including learning, development, preventative/promoting self-care responses, sharing
experiences and practice-based learning. Overall, the service aims to support staff’s
wellbeing, offer protection from the exposure of traumatic human experiences, while
building staff resilience and minimising disruption to the overall service through improved
sickness absence and higher staff retention rates. 
Case Study: Community Nursing
Connie, Newly Qualified Nurse (NQN), Garnock Valley and Kilwinning Community Nurse
Team
I was assigned to the Garnock Valley (GV) District Nurse team as a year 3 student on my
management placement. During this placement when the NQN recruitment process
commenced one of the Staff Nurses had indicated she was going to retire. I was keen to
work in community nursing and made this speciality my first choice on my application
form.
During my placement I was able to take on a small, delegated caseload and was able to
plan and assess the care for my patients with support from my Practice Supervisor and
also from the other staff in the team. This experience gave me confidence in what I would
expect as a Staff Nurse if successful at interview. 
All students in my cohort were offered interviews and I attended and I was delighted to
be informed I was the preferred candidate for the GV post. In the remainder of my
placement, I ensured I was exposed to as much of the community staff nurse role and
responsibilities as possible. I joined the team in September as a Band 4 Health care
Support Worker while my Nursing and Midwifery Council (NMC) pin was processed
which came through early October and I transitioned to a Registered Nurse. Working as
a NQN is a daunting experience for any individual, however I have only ever felt fully
supported and valued. Ongoing induction and mentorship to the role from both the wider
District Nurse team and participating in the NQN induction/education sessions has been
beneficial to my journey and it also allows me to discuss the NQN pathway with my peers
in other specialities and department. Although I’m a Staff nurse within the team I have
access to every part of the wider Health and Social Care partnership team in providing
high standard of care for our patients and their families.
331

Page 332

48 
The winners of the 2024 Partnership
Awards were announced at our
‘Promoting Wellbeing Together’ event at
the Redburn Community Centre in Irvine. 
The event was a fantastic celebration of
the staff, teams and individuals who
deliver health and social care services in
North Ayrshire, as well as the crucial work
of those in our communities who support
people with their wellbeing, including
volunteers, community organisations and
charities.
All employees of NAHSCP and our providers can now enjoy a year’s free access to
Holly Health, a fantastic mobile app that can support you to make small, achievable
changes that could help boost your health and wellbeing. 
Using a compassionate, personalised approach tailored to your own health goals,
interests and activities, the app can help you to reduce stress and anxiety, rebuild your
relationship with food, increase exercise and movement and improve your sleep.
Holly Health will assist you in making small but consistent changes to your daily
behaviours, helping you build healthier habits, promoting mindfulness and encouraging
you to be more kind to yourself.
In-app coaching is available through a supportive chat bot system, with friendly,
motivational reminders by text or email to keep you on the right track. The app also
contains a wealth of useful articles and videos that you can browse at your leisure.
Funded by NAHSCP, you’ll initially enjoy six months’ free access to the app, before being
invited to a further six-month subscription for free once that expires.
“I feel I have lessened how often I see my GP”
“This is a great idea and honestly feel this could help so many people if this is what
doctors are able to prescribe! A year’s free subscription to a brilliant self-help app, with
no restrictions and no judgement. This has been a godsend during a tough time.“
“The app is a great resource for reliably keeping on track with habits that are healthy and
productive. It is also very generous to allow us to have access to this app for the time
being. It is appreciated.“
The LiveWell group have partnered with KA leisure to bring free health checks to
Council employees. The KA Leisure health check sessions include lifestyle and weight
management advice along with cholesterol, blood pressure, blood sugar testing and the
Boditrax machine – a clever system that assesses your body and, very quickly, delivers
14 different measurements, such as your ideal weight, your BMI and your metabolic age.
332

Page 333

49 
Our Chief Executive Craig Hatton booked in to one of the health check sessions and
encouraged others to do the same. He said: “It’s been brilliant having the opportunity to
have my recent employee health
check, thanks to the LiveWell group
and our partners at KA Leisure.
I think it’s important that colleagues
understand just how vital it is to take
time for their own health and learn
about what they can do proactively to
improve it. The reason I booked in to a
recent KA Leisure health check was
because I am mindful that I’m not
getting any younger and I knew – for
my own peace of mind – that making
time to have the check done was going
to be beneficial for me.” 
333

Page 334

50 
Independent Care Providers who provide care services on our behalf 
Where we commission care and support from independent and 3rd sector Providers services based within the North Ayrshire area,
we monitor these services via the Contract Management Framework. The Framework focusses on ensuring a joint approach to
evaluating the quality of care and where appropriate provides an approach to supporting Providers to progress improvements. We
use a range of methods to monitor performance, including: 
• Formal Contract Management meetings on a 6 monthly basis and an Annual Joint Evaluation of Contract to ensure that services
are safe, effective and most of all, that they meet people’s needs
• Review of compliments, complaints and feedback from staff, carers and people who use services
• Information that we collect, before visits, from the provider or from our records
• Local and national information, for example, Care Inspectorate reports
• Visits to providers, including observing care and support and looking at records and documents 
The information below represents how those service which are registered with Care Inspectorate and are based in North Ayrshire
are currently performing.
Registered Services – Minimum Grades across all themes
Care Service Subtype
2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Adult Placement Service Not applicable 0 1 0 0 0 1
Care Home Service Older People 0 7 3 1 0 11
Care Home Service Children & Young
People 0 2 0 1 0 3
Care Home Service Learning Disabilities 0 1 2 0 0 3
334

Page 335

51 
Care Service Subtype
2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Care Home Service Mental Health
Problems 0 0 1 0 0 1
Child Minding Not applicable 0 4 5 0 0 9
Day Care of Children Not applicable 0 6 7 2 0 15
Housing Support Service Not applicable 0 0 3 3 0 6
School Care
Accommodation Service Not applicable 1 0 0 2 1 4
Support Service Care at Home 1 1 4 2 0 8
Support Service Other than Care at
home 0 0 1 0 0 1
Grand Total Not applicable 2 22 26 11 1 62 
335

Page 336

52 
Inspection of Local Services   
Throughout 2024 to 2025, a total of ten inspections took place by the Care
Inspectorate, eight were unannounced. 
• Health & Community Care - 2 inspections.
• Children & Families & Justice Services - 6 inspections.
• Adult Services - 2 inspections. 
The Care Inspectorate use a six-point scale to grade inspections:
1 Unsatisfactory Major weaknesses – urgent remedial action required
2 Weak   Important weaknesses – priority action required
3 Adequate  Strengths just outweigh weaknesses
4 Good   Important strengths, with some areas for improvement
5 Very Good  Major strengths
6 Excellent  Outstanding or sector leading 
Gradings for inspections can be found below. Inspection reports can be found on the
Care Inspectorate website - Inspection Reports. 
336

Page 337

53 
Inspection Date Service/Unit Wellbeing Leadership Staffing Environment Care &
Support
04 - June – 24 The Meadows 3 0 0 0 0
20 - June – 24 Montrose House 3 3 3 4 3
12- August - 24 Canmore 3 0 0 0 0
22 - October - 24 Trindlemoss Day
Opportunities 5 5 5 5 4
31 - October – 24 Montrose House 4 4 0 0 0
05 - November – 24 Supported Carers
Scheme 5 3 3 0 3
16 - January - 25 Trindlemoss
House 4 4 4 3 5
03 - March - 25 Adoption 5 3 0 0 4
26 - March - 25 Achnamara 3 0 0 0 0
28 - March - 25 Fostering 4 3 0 0 4 
337

Page 338

338