Democracy Spraffa

Annual Audit Report

North Ayrshire Council · 25 September 2025
Back to Integration Joint Board — 25 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire
Integration Joint
Board
2024/25 Annual Audit Report 
Prepared for North Ayrshire Integration Joint Board and the Controller of Audit 
September 2025

Page 2

0BNorth Ayrshire Integration Joint Board: 2024/25 Annual Audit Report | 2 
Contents 
Key messages 3
Introduction 5
Audit scope and responsibilities 6
Audit of the annual accounts 8
Wider scope and Best Value audit 12
Appendix 1 28
Appendix 2 30
Appendix 3 33 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.

Page 3

Key messages | 3 
Key messages 
Audit of the annual accounts
1 All audit opinions stated that the annual accounts were free from material
misstatement. 
2 There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed by
North Ayrshire Integration Joint Board (NAIJB).
Financial Sustainability 
3 In 2024/25 a budget overspend of £3.593 million was reported, covered by
additional funding contributions from partners.
4 The IJB used £4.730 million of reserves in the year.  At 31 March 2025 the
IJB has £3.161 million of earmarked reserves and no uncommitted reserves.
The IJB Reserves Strategy recommends that the IJB will aspire to hold
between 2 and 4% of its annual budgeted expenditure as an uncommitted
reserve. The lack of any uncommitted reserves therefore represents a
significant financial risk to both the IJB and its partners.
5 The 2025/26 budget included proposed savings of £4.019 million.  The latest
six-month progress update on the IJB’s transformation plan reports a £2.93
million savings and overspend reduction target for 2025/26. 
6 The Medium-Term Financial Outlook has identified required savings of
between £8.1 million and £21.4 million in 2026/27 (best case to worst case
scenarios). The IJB’s cost base is not sustainable; current funding levels and
savings from transformation will not cover the estimated costs.  The IJB
needs to support more radical reform and cost reductions if it is to
demonstrate financial sustainability.
Other Wider scope and Best Value audit 
7 The IJB has a clear strategic vision that is supported by its partners but
financial plans need to align to the vision to show how it can be delivered.

Page 4

Key messages | 4 
8 Performance management arrangements are effective.  Of the 18 national
indicators, 16 (89%) either achieved or were above target for 2024/25. 
However delayed discharges have increased by more than 61% over the
same period.
9 There is evidence of elements of Best Value being demonstrated by the IJB
across a range of areas.  However the mechanism for formally reviewing and
reporting on the arrangements to secure Best Value needs to be formalised
and reported to the board.

Page 5

Introduction | 5 
Introduction 
Purpose of the Annual Audit Report
1.  The purpose of this Annual Audit Report is to report the significant
matters identified from the 2024/25 audit of North Ayrshire Integration
Joint Board annual accounts and the wider scope areas specified in the
Code of Audit Practice (2021).
2.  The Annual Audit Report is addressed to North Ayrshire Integration
Joint Board, hereafter referred to as ‘the IJB’ and the Controller of Audit,
and will be published on Audit Scotland’s website in due course. 
Appointed auditor and independence
3.  Fiona Mitchell Knight, of Audit Scotland, has been appointed as
external auditor of the body for the period from 2022/23 until 2026/27. As
reported in the Annual Audit Plan, Fiona Mitchell Knight as engagement
lead and the audit team are independent of the IJB in accordance with
relevant ethical requirements, including the Financial Reporting Council’s
Ethical Standard. There have been no developments since the issue of the
Annual Audit Plan that impact on the continued independence of the
engagement lead or the rest of the audit team from the IJB, including no
provision of non-audit services. 
Acknowledgements
4.  We would like to thank the Audit and Performance Committee
members, Joint Board members, senior management, and other staff,
particularly those involved in the preparation of the annual accounts, for
their cooperation and assistance during the audit. We look forward to
working together constructively over the remainder of the five-year audit
appointment.

Page 6

Audit scope and responsibilities | 6 
Audit scope and responsibilities 
Scope of the audit 
5.  The audit is performed in accordance with the Code of Audit Practice,
including supplementary guidance, International Standards on Auditing
(ISA) (UK), and relevant legislation. These set out the requirements for the
scope of the audit which includes: 
• An audit of the financial statements and an opinion on whether they
give a true and fair view and are free from material misstatement. 
• An opinion on statutory other information published with the financial
statements in the annual accounts, namely the Management Commentary
and Annual Governance Statement.
• An opinion on the audited part of the Remuneration Report. 
• Conclusions on the IJB’s arrangements in relation to the wider scope
areas: Financial Management; Financial Sustainability; Vision, Leadership
and Governance; and Use of Resources to Improve Outcomes. 
• Reporting on the IJB’s arrangements for securing Best Value.
• Provision of this Annual Audit Report.
Responsibilities and reporting
6.  The Code of Audit Practice sets out the respective responsibilities of the
body and the auditor. A summary of the key responsibilities is outlined
below. 
Auditor’s responsibilities
7.  The responsibilities of auditors in the public sector are established in
the Local Government (Scotland) Act 1973. These include providing an
independent opinion on the financial statements and other information
reported within the annual accounts, and concluding on the IJB’s
arrangements in place for the wider scope areas and Best Value.
8.  The matters reported in the Annual Audit Report are only those that
have been identified by the audit team during normal audit work and may
not be all that exist. Communicating these does not absolve the IJB from
its responsibilities outlined below.

Page 7

Audit scope and responsibilities | 7 
9.  The Annual Audit Report includes an agreed action plan at Appendix 1
setting out specific recommendations to address matters identified and
includes details of the responsible officer and dates for implementation.
The body’s responsibilities
10.  The IJB has primary responsibility for ensuring proper financial
stewardship of public funds, compliance with relevant legislation and
establishing effective arrangements for governance, propriety, and
regularity that enables it to successfully deliver its objectives. The features
of proper financial stewardship include: 
• Establishing arrangements to ensure the proper conduct of its affairs. 
• Preparation of annual accounts, comprising financial statements for the
body that gives a true and fair view and other specified information. 
• Establishing arrangements for the prevention and detection of fraud,
error and irregularities, and bribery and corruption. 
• Implementing arrangements to ensure its financial position is soundly
based. 
• Making arrangements to secure Best Value. 
• Establishing an internal audit function.
Communication of fraud or suspected fraud
11.  In line with ISA (UK) 240 (The Auditor’s Responsibilities Relating
to Fraud in an Audit of Financial Statements), in presenting this report to
the Performance and Audit Committee we seek confirmation from those
charged with governance of any instances of actual, suspected or alleged
fraud that should be brought to our attention. Should members have any
such knowledge or concerns relating to the risk of fraud within the IJB, we
invite them to communicate this to the appointed auditor for consideration
prior to the Annual Accounts being certified.
National performance audit reporting
12.  The Auditor General for Scotland and the Accounts Commission
regularly publish performance audit reports. These cover a range of
matters, many of which may be of interest to the Integration Joint Board.
Details of national and performance audit reports published over the last
year can be seen in Appendix 3.

Page 8

Audit of the annual accounts | 8 
Audit of the annual accounts 
Main judgements
All audit opinions stated that the annual accounts were free from
material misstatement. 
There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed
by the body.
Audit opinions on the annual accounts 
13.  The IJB’s annual accounts were approved at the meeting of the
Integration Joint Board on 27th June 2025 and certified by the appointed
auditor on 25th September 2025. The Independent Auditor’s Report is
included in the body’s annual accounts, and this reports that, in the
appointed auditor’s opinion, these were free from material misstatement. 
Audit timetable 
14.  The unaudited annual accounts and all working papers were
received by 30 June 2025 in accordance with the agreed audit timetable. 
Audit Fee
15.  The audit fee for the 2024/25 audit was reported in the Annual
Audit Plan and was set at £34 thousand. There have been no
developments that impact on planned audit work required, therefore the
audit fee reported in the Annual Audit Plan remains unchanged. 
Materiality
16.  The concept of materiality is applied by auditors in planning and
performing an audit, and in evaluating the effect of any uncorrected
misstatements on the financial statements or other information reported in
the annual accounts.
17.  Broadly, the concept of materiality is to determine whether
misstatements identified during the audit could reasonably be expected to
influence the decisions of users of the annual accounts. Auditors set a
monetary threshold when determining materiality, although some issues
may be considered material by their nature. Therefore, materiality is
ultimately a matter of the auditor’s professional judgement.

Page 9

Audit of the annual accounts | 9 
18.  Materiality levels for the audit of the IJB were determined at the
risk assessment phase of the audit and were reported in the Annual Audit
Plan, which also reported the judgements made in determining materiality
levels. These were reassessed on receipt of the unaudited annual
accounts and updated as can be seen in Exhibit 1.
Exhibit 1
2024/25 Materiality levels for the IJB 
Materiality  IJB
Materiality – set at 2% of gross expenditure  £7.640 million
Performance materiality – set at 70% of materiality.
As outlined in the Annual Audit Plan, this acts as a
trigger point. If the aggregate of misstatements
identified during the audit exceeds performance
materiality, this could indicate further audit procedures
are required. 
£5.350 million
Reporting threshold – set at 5% of materiality.   £0.380 million
Source: Audit Scotland
Significant findings and key audit matters 
19.  ISA (UK) 260 requires auditors to communicate significant findings
from the audit to those charged with governance, which for the body is the
Integration Joint Board.
20.  The Code of Audit Practice also requires public sector auditors to
communicate key audit matters. These are the matters that, in the
auditor’s professional judgement, are of most significance to the audit of
the financial statements and require most attention when performing
the audit. 
21.  In determining key audit matters, auditors consider:
• Areas of higher or significant risk of material misstatement. 
• Areas where significant judgement is required, including accounting
estimates that are subject to a high degree of estimation uncertainty. 
• Significant events or transactions that occurred during the year.
22.  There are no significant findings or key audit matters to report.

Page 10

Audit of the annual accounts | 10 
Qualitative aspects of accounting practices 
23.  ISA (UK) 260 also requires auditors to communicate their view
about qualitative aspects of the body’s accounting practices, including
accounting policies, accounting estimates, and disclosures in the financial
statements.
Accounting policies 
24.  The appropriateness of accounting policies adopted by the body
was assessed as part of the audit. These were considered to be
appropriate to the circumstances of the body, and there were no
significant departures from the accounting policies set out in the Code of
Practice on Local Authority Accounting in the United Kingdom (the Code). 
Accounting estimates 
25.  Accounting estimates are used in number of areas in the body’s
financial statements.  Audit work considered the process management of
the body has in place around making accounting estimates, including the
assumptions and data used in making the estimates, and the use of any
management experts. Audit work concluded:  
• There were no issues with the selection or application of methods,
assumptions, and data used to make the accounting estimates, and these
were considered to be reasonable. 
• There was no evidence of management bias in making the accounting
estimates.
Disclosures in the financial statements
26.  The adequacy of disclosures in the financial statements was
assessed as part of the audit. The quality of disclosures was adequate,
with additional levels of detail provided for disclosures around areas of
greater sensitivity.
Significant matters discussed with management
27.  All significant matters identified during the audit and discussed
with the body’s management have been reported in the Annual Audit
Report.
Audit adjustments
28.  No audit adjustments were required to the financial statements
greater than the reporting threshold of £0.380 million.
Significant risks of material misstatement identified in the
Annual Audit Plan
29.  Audit work has been performed in response to the significant risks
of material misstatement identified in the Annual Audit Plan. The outcome
of audit work performed is summarised in Exhibit 2.

Page 11

Audit of the annual accounts | 11 
Exhibit 2 
Significant risks of material misstatement to the financial statements 
Risk of material
misstatement Planned audit response Outcome of audit work
Fraud caused by
management override of
controls 
Management is in a unique
position to perpetrate fraud
because of management’s
ability to override controls
that otherwise appear to be
operating effectively.
The audit team will:
• Assurances will be
obtained from the auditors
of NHS Ayrshire and Arran
and North Ayrshire Council
over the completeness,
accuracy and allocation of
income and expenditure. 
• Evaluate any significant
unusual transactions
outside the normal course
of business. 
Audit work performed found:
• We obtained assurances
from the auditors of NHS
Ayrshire and Arran and
North Ayrshire Council
over the completeness,
accuracy and allocation of
income and expenditure.
• No significant unusual
transactions outside the
normal course of business.
Conclusion: no evidence of
fraud caused by
management override of
controls. 
Source: Audit Scotland

Page 12

Wider scope and Best Value audit | 12 
Wider scope and Best Value
audit 
Conclusion
The 2024/25 year end budget overspend of £3.593 million was met by
additional funding contributions from partners.  
The IJB utilised £4.730 million of reserves in year.  At 31 March 2025
the IJB has £3.161 million of earmarked reserves and no uncommitted
reserves. This represents a significant financial risk to both the IJB and
its partners.
The 2025/26 budget included proposed savings of £4.019 million. The
latest six-month progress update on the IJB’s transformation plan
reports a £2.93 million savings and overspend reduction target for
2025/26.
The Medium-Term Financial Outlook has identified required savings of
between £8.1 million and £21.4 million in 2026/27 (best to worst case
scenarios). The IJB’s cost base is not sustainable; current funding levels
and savings from transformation will not cover the estimated costs.  The
IJB needs to support more radical reform and cost reductions if it is to
demonstrate financial sustainability.
The IJB has a clear strategic vision that is supported by its partners but
financial plans need to be aligned to the vision to show how it can be
delivered.  
Performance management arrangements are effective.  Of the 18
national indicators, 16 (89%) either achieved or were above target for
2024/25.  However delayed discharges have increased by more than
61% over the same period. 
Whilst there is evidence of elements of Best Value being demonstrated
by the IJB across a range of areas, the mechanism for formally
reviewing and reporting on the arrangements to secure Best Value
needs to be formalised and reported to the board.

Page 13

Wider scope and Best Value audit | 13 
Audit approach to wider scope and Best Value
Wider scope
30.  As reported in the Annual Audit Plan, the wider scope audit areas
are: 
• Financial Management.
• Financial Sustainability.
• Vision, Leadership and Governance.
• Use of Resources to Improve Outcomes. 
31.  Audit work is performed on these four areas and a conclusion on
the effectiveness and appropriateness of arrangements the body has in
place for each of these is reported in this chapter. 
Best Value 
32.  The duty on auditors to consider the arrangements in place to
secure Best Value applies to the body as it falls within section 106 of the
Local Government (Scotland) Act 1973.
33.  Consideration of the arrangements the body has in place to secure
Best Value has been carried out alongside the wider scope audit. 
Significant wider scope and Best Value risks 
34.  Audit work has been performed in response to the significant wider
scope and Best Value risks identified in the Annual Audit Plan. The
outcome of audit work performed is summarised in Exhibit 3.

Page 14

Wider scope and Best Value audit | 14 
Exhibit 3
Significant wider scope and Best Value risks
Significant risk Planned audit response Outcome of audit work
Financial planning and
sustainability 
At month 7 against the full-
year budget of £324.231m
there is a projected year-end
overspend of £6.190m
(1.9%), reduced to £3.613m
through identified financial
recovery actions.  This overall
position consists of a
projected residual overspend
of £2.548m in social care
services and a projected
overspend of £1.065m in
health services. The IJB has
approached NAC and
NHSAA for additional
funding.  
Current budget scenarios for
2025/26 are a £0.6m
underspend (best-case),
£3.7m overspend (medium-
case) and a £11.8m
overspend (worst-
case).  Additional budget
savings will require to be
identified to achieve a
balanced budget position for
approval by the IJB in
March.  
The audit team will: 
• Monitor progress in
achieving the 2024/25
revenue budget,
2024/25 financial
recovery actions and
cost avoidance plans.  
• Review of financial
performance reports
presented to the
Board. 
• Review the medium-
term financial plan and
assessment of plans to
address any
forecasted budget
deficits. 
• Evaluate the IJB’s
progress with the
development of its
Transformation Plan
and assess how this is
contributing to the
achievement of
financial balance.
Audit work identified that:
• The 2024/25 budget was
overspent by £3.593
million which was funded
by contributions from
partners. 
• Medium term financial
forecasts show significant
funding gaps in 2026/27
and 2027/28.
• There are no approved
plans to meet the budget
gaps set out in the Medium
Term Financial Outlook.
This needs to be
addressed as a matter of
urgency.
Conclusion: There is a
risk that the IJB is unable
to deliver the
transformational change or
cost reductions at the pace
required.
Source: Audit Scotland
Prior year recommendations 
35.  The IJB has made some progress towards implementing the
agreed prior year recommendations relating to the wider scope audit.
Progress against these is outlined in Appendix 2 of this report.  Two
remain ongoing and will be followed up again as part of the 2025/26 audit.

Page 15

Wider scope and Best Value audit | 15 
Conclusions on wider scope audit
Financial Management 
A balanced budget was set for 2024/25 this included
£10.290 million of savings proposals with no draw on
reserves 
36.  The IJB set a balanced budget for 2024/25 on 14 March 2024.
This did not require any draw on reserves but did include the approval of
£10.290 million of savings to achieve financial balance.  Required savings
were split £9.255 million social care and £1.035 million health services.
37.  £7.238 million of the social care savings arose from the non-
recurring reduction in employer superannuation contribution rates from 1
April 2024.  A further £0.375 million was a reduction in the number of
funded care home places by 15, leaving budgetary provision for 765
places at average cost.  The largest element of health savings was £0.5
million from a reduction in Hospital Based Complex Continuing Care
provision.
The 2024/25 year end budget overspend of £3.593 million
was met by additional funding contributions from
partners
38.  The year end budget was overspent by £1.212 million, prior to
transfer of unspent funding allocations of £2.381 million to earmarked
reserves.  This resulted in an overall overspend of £3.593 million. The
Integration Scheme provides for funds to be made available (by the
partners) for overspends against the operational budget.  However the
partners also agreed to make funds available for the carry forward of
unspent Scottish Government funding allocations including Whole Family
Wellbeing (£0.9 million), Alcohol and Drug Partnership (£0.4 million),
Mental Health Recovery and Renewal (£0.4 million) and Primary Care
Improvement Fund (£0.3 million).  
39.  North Ayrshire Council considered this at their Cabinet meeting of
3 June 2025 and agreed to a non-recurring funding increase of £2.036
million and no requirement to repay the funds in future years.  Similarly,
NHSAA funded the health services overspend of £1.557 million.
40.  The Chief Officer reported to the IJB meeting of 19 June 2025 that
the required savings of £10.290 million had been achieved in full.
41.  Significant variations from budget included Care at Home which
was £2.712 million overspent reflecting the cost of meeting the increased
demand and level of provision for care at home support.  In addition, Care

Page 16

Wider scope and Best Value audit | 16 
Experienced Children and Young People was overspent by £1.903 million,
mainly due to increased demand for children’s residential placements.
The IJB utilised £4.730 million of reserves in year.  At 31
March 2025 the IJB has £3.161 million of earmarked
reserves and no uncommitted reserves. This represents a
significant financial risk to both the IJB and its partners
42.  One of the key measures of the financial health of a body is the
level of reserves held. The IJB general fund reserve can be earmarked
balances for future commitments or uncommitted balances. The IJB’s
reserve strategy was approved by the Board in March 2024. The strategy
outlines a target contingency level of 2 - 4% of annual budgeted
expenditure.
43.   At 31 March 2025, the IJB had no uncommitted reserve balances
against the target level for the year of £6.715 - £13.430 million.  The
absence of any uncommitted general fund reserves seriously limits the
IJB’s ability to manage and mitigate future financial pressures and
represents a significant financial risk to both the IJB and its partners.
44.  In 2023/24 we recommended that the IJB must urgently map a
clear route to bring uncommitted reserves back up to the minimum
level. The IJB accepts and acknowledges that uncommitted reserves
require to be restored to the minimum recommended level.  However the
Annual Accounts also report that in the short-term, service pressures
mean that this will not be achievable.
45.  Total earmarked reserves of £3.161 million include the unspent
funding allocations of £2.381 million noted at paragraph 38 above together
with the balance of £0.780 million on the Service Redesign/Challenge
Fund.
46.  Whilst concerns are highlighted in relation to the uncommitted
reserves and a requirement to reinstate these as a tool for effective
financial management and sustainability, it is acknowledged that the
balance of reserves will be considered as part of the IJB annual budget
setting process. Whilst the ambition would be to plan to replenish the
contingency reserves for the IJB in future years, in setting the budget for
2025/26 the IJB were advised that the reality is in the current financial
operating environment there is not the ability or scope to plan for this in
the short term.  This is acknowledged as a challenge for all IJBs, with
reports that at the end of 2024/25 over half of IJBs across Scotland hold
no contingency reserve and only one area is expected to have reserves
over 2% moving into 2025/26.

Page 17

Wider scope and Best Value audit | 17 
Financial systems of internal control operated effectively 
47.  The IJB is reliant on the systems of its partner bodies. NHS
Ayrshire and Arran and North Ayrshire Council, for its key financial
systems, including ledger and payroll. All IJB transactions are processed
through respective partners’ systems and all controls over those systems
are within the partner bodies rather than the IJB.
48.  As part of our audit approach, we sought assurances from the
external auditors of NHS Ayrshire and Arran and North Ayrshire Council
(in accordance with ISA 402) and confirmed there were no weaknesses in
the systems of internal control for either the health board or council.
High absence rates were reported in areas which require
cover arrangements, principally care at home.  In 2024/25
this resulted in additional costs of £1.05 million
49.  Overtime costs of £1.05 million were incurred by the HSCP to
provide absence cover requirements.   For Care at Home (£0.85 million)
the HSCP budgets for a full establishment but overtime is funded through
vacant posts or ‘20 hour’ posts. Cover requires to be provided as service
users cannot be left without a life and limb service. The remaining £0.2
million relates to the children’s houses which also require that any
absences are covered, and financial inclusion which relates to overtime
worked as part of the financial reassessment process.
50.  A performance report for Quarter 1 2025/26 submitted to the
Performance and Audit Committee in September 2025 outlined that
wellbeing action plans around sickness absence levels within the Care at
Home workforce were being robustly managed and supporting staff to
maintain attendance/return to work. Despite these efforts the service saw
an increase in front line staff absences by a further 1% from Quarter 4
2024 to 2025 to Quarter 1 2025 to 2026, with sickness absence now over
14%. The service has also experienced significant challenges in sickness
absence and vacancies within non-frontline service delivery roles.
Standards of conduct and arrangements for the
prevention and detection of fraud and error were
appropriate 
51.  The IJB does not maintain its own policies relating to the
prevention and detection of fraud and error but instead depends on those
in place at its partner bodies. We reviewed the arrangements in place at
NHS Ayrshire and Arran and North Ayrshire Council through consideration
of the work by partner body auditors and found them to be adequate.

Page 18

Wider scope and Best Value audit | 18 
52.  Appropriate arrangements are in place for the prevention and
detection of fraud and error. We are not aware of any specific issues we
require to bring to your attention.
Financial Sustainability 
The IJB cannot demonstrate the financial sustainability of
its services
53.  Financial sustainability looks forward to the medium and longer
term to consider whether the body is planning effectively to continue to
deliver its services or the way in which they should be delivered. 
54.  As outlined at Exhibit 3, a significant wider scope risk was
identified around financial sustainability. We have noted below significant
challenges going forward in the IJB’s ability to achieve financial balance. 
55.  The IJB approved its medium term financial plan 2025-2028 in
December 2024.   An update to the original projected funding gap was
presented to the IJB in March 2025 as part of the annual budget for
2025/26.
The 2025/26 budget includes proposed savings of £4.019
million
56.  As set out in Exhibit 4, the 2025/26 budget has a funding gap of
£3.069 million and the IJB approved savings of £4.019 million.  This level
of savings was proposed to create a surplus of £0.950m as a contingency
towards any 2024/25 overspends which would continue into 2025/26.  The
IJB was updated on the projected implications of overspends in 2024/25
moving into the new financial year and additional savings were approved
to support the management of these overspends during 2025/26 rather
than any surplus being planned to for example reinstate reserves.

Page 19

Wider scope and Best Value audit | 19 
Exhibit 4
North Ayrshire IJB 2025/26 Budget Gap and Savings 
Source: North Ayrshire IJB
57.  The £4.019 million savings are rated £2.984 million Amber and
£1.035m Green.  Amber rated savings include: Improve outcomes for care
experienced young people (£1.0 million);  Continued review of Care at
Home service (£0.5 million); and review of Financial Inclusion Service
(£0.36 million).  
58.  There is considerable uncertainty around a significant proportion
of these savings.  For example, improving outcomes for care experienced
young people will require significant understanding of both the costs
associated with the current system and to identify what needs to change,
and further reduction in the care at home service has the potential to
create cost pressures in other parts of the system. Care Experienced
Children and Young People is projected at Month 3 to overspend by
£2.857 million in 2025/26.  Care at Home is projected at Month 3 to be
£1.641 million overspent in 2025/26. In addition and as noted at para 41
above, both of these areas were significantly overspent in 2024/25.  The
Chief Officer has confirmed that issues are being addressed by various
initiatives, monitoring and review.  
The Medium-Term Financial Outlook has identified
required savings of between £13.6 million and £21.4
million in 2026/27
59.  A Medium-Term Financial Outlook (MTFO) has been prepared to
identify what the financial position may look like moving into 2026/27 and
2027/28.  The MTFO notes that for 2025/26, the outturn was between the
projected medium and the worst case scenarios for that year and it would
be prudent to assume a similar position for2026/27 and 2027/28.  As set

Page 20

Wider scope and Best Value audit | 20 
out at Exhibit 5, the modelling which has been carried out has identified
required savings of between £13.6 million and £21.4 million for 2026/27
and between £5.7 million and £14.7 million for 2027/28.
60.  The significant shortfall in 2026/27 is linked to the expected
increase in local government employer pension contributions from 6.5% in
2025/26 to 17.5% in 2026/27.
Exhibit 5 
North Ayrshire MTFO 2026/27 – 2027/28 
Source: North Ayrshire IJB
The MTFO indicates the IJB’s cost base is not
sustainable; current funding levels and savings from
transformation will not cover the estimated costs.  The
IJB needs to support more radical reform and reduce the
cost base if it is to demonstrate financial sustainability
61.  The Accounts Commission’s July 2024 report on Integration Joint
Boards: Finance and Performance 2024 emphasised the need for a more
significant transformation of services to achieve financial sustainability.
This is becoming increasingly important as recurring savings get more
difficult to identify and achieve.   
62.  The overall picture, set out by the Accounts Commission is
concerning. It shows a continued picture of overspending, depletion of
reserves and reliance on one-off rather than recurring savings. There is a
need for transformational changes in the way services are being delivered
and for the identification and delivery of significant recurring savings. IJBs
in Scotland also need to be working collaboratively with each other and
with their NHS and council partners to find ways to transform services on a
longer-term basis so that they are affordable.
63.  In 2023/24 we reported that the IJB has recognised that the
challenging financial environment it is operating in will likely continue for
some years to come and agreed an updated Transformation Plan 2024-27
in March 2024. We also reported that the Service Redesign and Change

Page 21

Wider scope and Best Value audit | 21 
Fund aims to support the Transformation Plan through the redesign of
services and investments in new technologies. The balance on the Fund
at 31 March 2025 was £0.780 million. These funds are allocated on a non-
recurring basis.  
64.  An Internal Audit review of IJB transformation submitted to the
September 2025 Performance and Audit Committee gave an opinion of
substantial assurance in relation to the governance of the Transformation
Plan.  
65.  Not all projects in the Transformation Plan have a direct financial
impact although a number will deliver financial savings.  Of the 75 projects
approved in March 2024, 40 were reported as having a financial impact. 
Some financial targets were identified as part of the budget development
for 2025/26.  Identified savings and overspend reductions are tracked in
the online trackers.
66.    The latest six-month progress update was provided to the IJB in
August 2025.   The report provided updates on specific projects across all
service areas and notes a £2.93 million savings and overspend reduction
target for 2025/26. 
67.  The Transformation Plan is critical to the ongoing sustainability of
service delivery.  In 2023/24 we reported that that the refreshed
Transformation Plan includes timescales and is being overseen by the
IJB’s Transformation Board.  However based on current projections,
savings from transformation fall significantly short of the potential budget
gaps in 2026/27 and 2027/28.  Financial recovery from this position will
require radical reform of services.  Whilst the transformation programme
needs to be sufficiently ambitious to respond to the scale of the financial
challenges, the Chief Officer is clear that future recurring savings also
need to be made through workforce changes, service review and charging
reviews. In the absence of any contingency reserve of its own, the
increased demand for health and social care services alongside rising
costs presents a significant financial risk to both the IJB and its partners.
68.  Recurring pressures are currently being met with a combination of
recurring and non-recurring solutions with an underlying recurring over-
commitment. This needs to be addressed as a matter of urgency. An
effective medium term financial recovery plan needs to be introduced, and
decisions made about the way services are delivered in the short, medium
and longer-term based on information about the cost, impact and quality of
all available options. Detailed scenario planning should also be
undertaken to provide an understanding for the IJB of the effects of
various reform options.
69.  In 2023/24 we reported that in order to facilitate greater scrutiny of
the financial position and the delivery of the financial recovery plan during
2024/25.  The IJB agreed at its June 2024 meeting to establish a ‘Finance
Working Group’, chaired by the IJB Vice Chair. The Director and Heads of

Page 22

Wider scope and Best Value audit | 22 
Service are members of the group. This Group will continue to meet
monthly during 2025/26 to facilitate increased oversight and scrutiny of the
financial position and transformation programme as well as detailed
budget planning for future financial years.
70.  Change and cost base reduction now needs to happen quickly if
the IJB is to address its transformational challenges. More focused and
effective leadership is needed to drive the change and to promote a
culture of challenge. Joint Board members should challenge the progress
being made.
Recommendation 1:  The Chief Officer, Joint Board members and the
Finance Working Group need to produce a financial plan that
demonstrates how efficiencies from service reform, cost base reduction
and transformation will meet the budget gaps outlined in the MTFO. 
Progress should be reviewed and challenged by the board.  
71.  There are an additional number of risks and challenges faced by
the IJB from the anticipated budget pressures.
72.   We have previously reported that IJBs, with the support of council
and NHS board partner bodies, should be clear about how and when they
intend to achieve their priorities and outcomes, in line with their available
resources; and ultimately how they intend to progress to sustainable,
preventative and community-based services. 
73.  The IJB needs to operate within its delegated budgets however
there are a number of risks and challenges faced by the IJB from the
anticipated budget pressures. For example: 
• The IJB is stopping or reducing services to deliver from within
reduced financial allocations. Whilst the IJB is not in a positive
financial position, further reductions of service in the community has
the potential to create cost pressures in other parts of the system 
•  NHS Ayrshire and Arran continue to meet the increased costs of
energy, e-health and all drugs (including primary care prescribing) in
line with the approved integration scheme (see paragraph 74 below). 
The IJB holds the budget for mental health services and addictions
prescribing
• In relation to the set aside budget, the monitoring of large hospital
activity is complex and requires significant work to be undertaken to
monitor budgets and changes in activity levels (see paragraph 75
below)
• The Integration Scheme for North Ayrshire IJB was last updated in
2018.  There is a legal duty on councils and health boards to review
the Integration Schemes at least every 5 years to consider whether

Page 23

Wider scope and Best Value audit | 23 
any changes are necessary or desirable.  The Integration Scheme is
being reviewed on a Pan Ayrshire basis and will be taken to
respective governance boards in 2026.
Work to rebalance the financial risk between the
Integration Joint Boards and the Health Board in some
areas remains ongoing
74.  NHS Ayrshire and Arran currently meet the increased costs of
energy, e-health and all drugs (including primary care prescribing).  The
IJB holds the budget for mental health services and addictions prescribing.
The integration scheme sets out the position in relation to primary care
prescribing, however the scheme also requires that in relation to the set
aside budget, the IJBs should contribute financially if they are responsible
for increased use and risk sharing in these areas.
75.  In 2023/24 we reported that Ayrshire Finance Leads have now
developed and agreed on a new model for costing the set aside
arrangements, based on actual bed usage and average costs which was
expected to be enacted operationally during 2024/25.  However NHS
Ayrshire and Arran has also requested the development of a joint strategic
commissioning plan to enable the setting of directions for Unscheduled
Care, aligned with the Set Aside resources, which has not yet been
approved by the three IJBs. 
76.  We previously reported that during 2023/24, a Task Group relating
to Primary Care Prescribing and led by the Health Board’s Director of
Finance, agreed in principle that whilst IJBs should hold full responsibility
for Primary Care Prescribing, a prudent approach would be to undertake a
period of learning to enable chief officers and funding partners to fully
understand the implications of such a decision.  We are now advised that
the transfer of responsibility of primary care prescribing would require all
parties to the integration schemes to agree to this change (council and
health board) and for due diligence to establish if the service is
appropriately funded.  
Vision, Leadership and Governance 
Governance arrangements are appropriate and operate
effectively 
77.  The audit work performed on the arrangements the IJB has in
place around its Vision, Leadership and Governance found that these
were effective and appropriate. 
78.  There continues to be an increasing focus on demonstrating the
best use of public money. Openness and transparency in how a body

Page 24

Wider scope and Best Value audit | 24 
operates and makes decisions is key to supporting understanding and
scrutiny. Transparency means that the public has access to
understandable, relevant, and timely information about how the body is
taking decisions and using resources. 
79.  For 2024/25 the IJB held its meetings in person. The meeting
papers and minutes are available on the IJB’s website.  All Performance
and Audit Committee meetings continued to be held remotely.    
80.  We consider that governance arrangements are appropriate and
generally support effective scrutiny, challenge and decision-making.   The
IJB has a clear strategic vision that is supported by its partners 
81.  The Public Bodies (Joint Working) (Scotland) Act 2014 requires
the IJB to prepare a strategic plan that sets out the arrangements in place
to carry out the integration functions over the period of the plan. The Act
also requires that the plan set out how those arrangements are intended to
achieve, or contribute to achieving, the national health and wellbeing
outcomes. 
82.  To support the IJB in achieving these responsibilities, it has
established a clear strategic vision as set out in its “Caring Together
“Strategic Plan 2022-2030. The plan contains five strategic
objectives/priorities:  
• Enable communities 
• Develop and support workforce 
• Provide early and effective support 
• Improve mental and physical health and wellbeing 
• Tackle inequalities 
83.  The IJB provides services as set out in its Integration Scheme.
The Strategic Plan objectives aim to give direction to the services provided
and commissioned by the IJB and are based on its engagement with its
partners and other key stakeholders together with consideration of
national outcomes.  The current Strategic Plan has no links to financial
plans.
84.  In 2022/23 we reported that the IJB was to refresh the Strategic
Plan in 2024 to ensure it is relevant and up to date. That review is now
underway and includes the development of a new action plan together
with a refresh of the main document to bring this in line with the current
landscape. It is proposed to present the updated document to the IJB in
December 2025.

Page 25

Wider scope and Best Value audit | 25 
A review of the Integration Scheme is ongoing and is due
to conclude  in 2026 
85.  The Public Bodies (Joint Working) (Scotland) 2014, places a legal
duty on Councils and Health Boards to review the Integration Schemes at
least once every five years to consider whether any changes are
necessary or desirable. 
86.  As set out at para 71 above, the Integration Scheme for the IJB
was last reviewed in 2018. The current review of the Integration Scheme
has been undertaken on a pan-Ayrshire basis by the three Councils and
the Health Board to ensure a consistent and co-ordinated approach. A
project Board was established to oversee the work and various work
groups were established. The review of the Integration Scheme through
the various workgroups concluded in March 2024. Further work has since
been undertaken to consider specific issues and the overall legal
competence of the Scheme.
87.  It is anticipated that the Integration Scheme review will conclude in
2026. Following this, it will require approval by North Ayrshire Council and
NHS Ayrshire and Arran, prior to submission to the Scottish Ministers.
Use of Resources to Improve Outcomes 
Performance management arrangements are effective.  Of
the 18 national indicators, 16 (89%) either achieved or
were above target for 2024/25.  However delayed
discharges have increased by more than 61% over the
same period 
88.  The Performance and Audit Committee has a role in providing
oversight of performance reporting against the strategic plan. Twelve
month rolling performance reports are presented to most meetings of the
committee. This provides assurance to the Performance and Audit
Committee of overall performance.
89.  There are local indicators used for performance reporting by the
IJB, however for comparability when assessing the performance of the
IJB, we have considered several key Ministerial Strategic Group for Health
and Community Care (MSGHCC) measures that are used to track
performance in Integration Authorities. 
90.  Of the 16 local indicators used, 14 out of 16 (87.5%) either
achieved or were above target.  Exhibit 6 sets out the IJB’s results against
a number of the MSG measures for 2024/25 .  Of the 18 indicators, 16
(89%) either achieved or were above target.  However delayed discharges

Page 26

Wider scope and Best Value audit | 26 
bed days  increased from 1,785 during March 2024 to 2,876 during March
2025, an increase of 61.1%.
91.  Delays in accessing Care at Home supports are largely due to
overall capacity to deliver services. As part of the IJB’s financial recovery
plan for 2024/25, which has continued into 2025/26, a recruitment freeze
was implemented to reduce the overspend.  This has resulted in a
reduction in the overall workforce and an overall reduction in service
capacity.  The service has developed a Winter Preparedness and Delayed
Discharge Improvement Plan with a key focus on supporting Care at
Home Capacity.  However with a reduction in service capacity, an
increased focus on early discharge from hospital and a sickness absence
rate of over 14% in the Care at Home workforce, improvement in this area
is unlikely without radical reform.  Current initiatives include
implementation of a call monitoring system, a review of roles, prioritisation
of access including reviews of eligibility criteria.
Exhibit 6
National performance measures (age 18+)  
Measures   24/25 performance   Improving from 23/24 
Emergency admissions to
acute hospitals  9.1% decrease  Yes 
Unscheduled “hospital bed
days” in acute hospital  40.8% decrease  Yes 
Unscheduled “hospital bed
days” in geriatric long stay 68.3% decrease Yes
Emergency department
attendances 0.5% increase No
Delayed transfers of care bed
days (all)  61.1% increase   No  
Source: North Ayrshire IJB - Annual Performance Report 2024-25 
92.  Whilst there is a need for caution when drawing conclusion from
national comparisons, the Accounts Commission’s Integration Joint
Boards: Finance and Performance 2024 report makes it clear that IJB’s
need to make best use of available data. This needs to include effective
data sharing between partners and key stakeholders. To that end, it is
important that members and management of North Ayrshire IJB satisfy
themselves that the performance results of it are fully assessed on a
continual basis and that these results are used to effectively inform how to
improve outcomes for people who use its services.
93.  We conclude that the IJB has established appropriate
arrangements for reporting performance against national outcomes
through the Annual Performance report.

Page 27

Wider scope and Best Value audit | 27 
A formal review should be undertaken to demonstrate
how the IJB is achieving Best Value 
94.      The Code of Audit Practice requires us to consider the
adequacy of the arrangements in place to demonstrate how the IJB meets
its Best Value duty to secure continuous improvement in the performance
of its functions.  We expect bodies to demonstrate that they meet the
expectations in the Scottish Government, Local Government in Scotland
Act 2003 Best Value: Revised Statutory Guidance 2020.  
95.  Our work on the four wider scope audit areas financial
management, financial sustainability, vision, leadership and governance
and the use of resources to improve outcomes provides evidence of how
the IJB performs in some important areas of Best Value.  Whilst there is
evidence of elements of Best Value being demonstrated by the IJB across
a range of areas, the mechanism for formally reviewing and reporting on
the arrangements to secure Best Value is not formalised and reported to
the Board.    
Recommendation 2:  A Best Value assurance framework should be
formalised, to set out how annual assurances from the IJB’s partners
can be used to provide assurance on Best Value arrangements to the
Board.

Page 28

Appendix 1 | 28 
Appendix 1
Action plan 2024/25
2024/25 recommendations
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing   
1. Financial sustainability
There are no approved plans to meet
the budget gaps set out in the MTFO.
This needs to be addressed as a
matter of urgency. 
An effective long term financial
recovery plan needs to be introduced,
and decisions about the way services
are delivered in the short, medium
and longer-term based on information
about the cost, impact and quality of
all available options. Detailed scenario
planning should also be undertaken to
provide an understanding for the IJB
of the effects of various reform
options.
Risk: There is a risk that the IJB is
unable to deliver the transformational
change at the pace that is required.
The Chief Officer,
Joint Board
members and the
Finance Working
Group need to
produce a financial
plan that
demonstrates how
efficiencies from
service reform , cost
base reductions and
transformation will
meet the budget
gaps outlined in the
MTFO.  Progress
should be reviewed
and challenged by
the board. 
(paragraph 70)
Accepted 
Preparation for the 2026/27
budget has commenced. The
Transformation Plan is being
further developed with a
focus on aligning financial
impact to areas of service
change.  A series of meetings
is being held with every
senior manager to review
their services and look at
ways of reducing spend
through either redesign or
cessation of services.  Once
completed the actions
identified will be discussed at
the Finance Working Group
prior to proposals being
presented to the IJB for
approval.  Proposals will be
submitted throughout
2025/26 e.g Brighter
Pathways will be presented in
November 2025.  Final
proposals to bridge any
remaining gap will be
presented in March 2026 as
part of the 2026/27 budget
paper. This work will also
include savings beyond
2026/27.
Chief Officer and Chief
Finance Officer
March 2026

Page 29

Appendix 1 | 29 
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing
2. Arrangements to secure Best
Value
Whilst there is evidence of elements
of Best Value being demonstrated by
the IJB across a range of areas, the
mechanism for formally reviewing and
reporting on the arrangements to
secure Best Value is not formalised
and reported to the Board.
Risk: The is a risk that the IJB is not
meeting its Best Value duty to secure
continuous improvement in the
performance of its functions.
A formal review of
the Best Value
assurance
framework and an
assessment of the
partnership’s Best
Value arrangements
should be completed
and reported to the
Joint Board.
(paragraph 95)
Accepted 
A Best Value framework will
be developed and presented
to the IJB, thereafter this will
be incorporated into the
Annual Performance Report
as the mechanism for regular
reporting to the IJB. 
Chief Officer
February 2026

Page 30

Appendix 2 | 30 
Appendix 2
Follow-up of prior year recommendations in the 2023/24 Annual
Audit Report
Issue/Risk Recommendation
Agreed management
action/timing 
PY1. Financial management   
Financial monitoring report
projections during the year varied
significantly from actual outturn.
Financial projections
should be based on clear
evidence and realistic
assumptions.
Complete
The projection for Care at
Home costs in 2023/24 was
understated due to an error in
the forecasting template. This
was explained to the IJB at
the June meeting and was
rectified for 2024/25.
PY2.  Unidentified savings 
At the end of Month 4 (July
2024), the IJB reported a
projected year-end overspend of
£6.697m. Identified financial
improvement actions amount to
£3.702m, A further £2.995m of
financial recovery improvement
actions still require to be
identified.  
The IJB should ensure
that savings plans are
developed as a matter of
urgency, identifying how
the required £2.995
million of financial
recovery improvement
actions in 2024/25 will be
achieved.
Ongoing 
The IJB set a balanced
budget for 2024/25 on 14
March 2024. This did not
require any draw on reserves
but did include the approval
of £10.290 million of savings
to achieve financial balance.   
The 2005/26 budget has a
funding gap of £3.069 million
and proposed savings of
£4.019 million.

Page 31

Appendix 2 | 31 
Issue/Risk Recommendation
Agreed management
action/timing 
PY 3. Uncommitted reserves   
The IJB Reserves Strategy
recommends that the IJB will
aspire to hold between 2 and 4%
of its annual budgeted
expenditure as an uncommitted
reserve. The uncommitted
reserve balance at 31 March
2024 was £0.357 million
(representing only 0.1% of the
IJB’S 2024/25 budget)  and
therefore does not meet the lower
target.  In addition, uncommitted
reserves are forecast to be
depleted by 31 March 2025. 
The IJB must urgently 
map a clear route to bring
uncommitted reserves
back up to the minimum
level. 
Ongoing. 
At 31 March 2025, the IJB
had zero uncommitted
reserves balance against the
target level for the year of
£6.715 - £13.430 million. 
The absence of any
uncommitted general fund
reserves seriously limits the
IJB’s ability to manage and
mitigate future financial
pressures and represents a
significant financial risk to
both the IJB and its partners. 
The IJB accepts and
acknowledge that
uncommitted reserves require
to be restored to the
minimum recommended
level.  However it also reports
in the Annual Accounts that
in the short-term, service
pressures mean that this will 
not be achievable. This will
require to be considered as
part of the annual budget
setting process alongside the
funding allocations from both
partner bodies.

Page 32

Appendix 2 | 32 
Issue/Risk Recommendation
Agreed management
action/timing 
PY B/F 1.  Transformation Plan
(2022/23 recommendation) 
The IJB needs to be clearer
about how the ongoing
improvement activity makes a
difference to the outcomes the
IJB and its partners want to
achieve. 
The IJB and its partners
need to clearly set out
what achieving its
intended outcomes looks
like in the short, medium
and longer term.
Superseded 
Based on current projections,
projected savings from
transformation are not
enough to close the potential
budget gaps in 2026/27 and
2027/28.  Financial recovery
from this position will require
radical reform of services and
service/cost reductions.  In
the absence of any
contingency reserve of its
own, this presents a
significant financial risk to
both the IJB and its partners. 
An effective long term
financial recovery plan needs
to be introduced, and
decisions about the way
services are delivered in the
short, medium and longer-
term based on information
about the cost, impact and
quality of all available
options. Detailed scenario
planning should also be
undertaken to provide an
understanding for the IJB of
the effects of various reform
options. 
See Recommendation 1 of
our 2024/25 action plan.

Page 33

Appendix 3 | 33 
Appendix 3
Supporting national and performance audit reports 
Report name Date published
Local government budgets 2024/25 15 May 2024
Scotland’s colleges 2024 19 September 2024
Integration Joint Boards: Finance and performance 2024 25 July 2024
The National Fraud Initiative in Scotland 2024 15 August 2024
Transformation in councils  1 October 2024
Alcohol and drug services 31 October 2024
Fiscal sustainability and reform in Scotland  21 November 2024
Public service reform in Scotland: how do we turn rhetoric
into reality?
26 November 2024
NHS in Scotland 2024: Finance and performance 3 December 2024
Auditing climate change 7 January 2025
Local government in Scotland: Financial bulletin 2023/24 28 January 2025
Transparency, transformation and the sustainability of council
services
28 January 2025
Sustainable transport  30 January 2025
A review of Housing Benefit overpayments 2018/19 to 2021/22:
A thematic study
20 February 2025
Additional support for learning 27 February 2025
Integration Joint Boards: Finance bulletin 2023/24 6 March 2025
Integration Joint Boards finances continue to be precarious 6 March 2025
General practise: Progress since the 2018 General Medical
Services contract
27 March 2025
Council Tax rises in Scotland 28 March 2025

Page 34

North Ayrshire Integration Joint
Board
2024/25 Annual Audit Report 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0