Democracy Spraffa

Agenda Document Pack - Integration Joint Board - 21/08/2025

North Ayrshire Council · 21 August 2025
Back to Integration Joint Board — 21 August 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Integration Joint Board
Meeting
Thursday, 21 August 2025 at 10:00
Council Chambers, Cunninghame House, Irvine /
Hybrid via Microsoft Teams
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with provision,
by prior notification, for remote attendance by Elected Members in accordance
with the provisions of the Local Government (Scotland) Act 2003.  Where
possible, the meeting will be live-streamed and available to view at
https://north-ayrshire.public-i.tv/core/portal/home. 
1 Apologies
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in respect
of items of business on the Agenda.
3 Minutes
The accuracy of the Minutes of the meeting held on 19 June 2025 will be
confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973 (copy enclosed).
4 Director’s Report
Submit report by Caroline Cameron, Director (NAHSCP), on developments
within the North Ayrshire Health and Social Care Partnership (copy enclosed).
5 2025-26 – Month 3 Financial Performance
Submit report by Eleanor Currie, Chief Finance Officer, providing an overview
of the Integration Joint Board’s financial performance as at month 3 (June)
(copy enclosed).
6 Montrose House Care Home - Arran
Submit report by Kerry Logan, Head of Service (Health & Community Care)
presenting, amongst other things, the outcome of the recent options appraisal
for Montrose House (copy enclosed).
1

Page 2

7 Transformation Plan – Progress Update
Submit report by Scott Hunter, Chief Social Work Officer (NAHSCP), providing
an update on the progress of the HSCP Transformation Plan (copy enclosed).
8 North Ayrshire HSCP Clinical and Care Governance Report 2024-25
Submit report by Darren Fullarton, Lead Nurse/Associate Director (NAHSCP),
providing an update and overview of governance activity for the period August
2024 – July 2025 for consideration by the Integration Joint Board (copy
enclosed).
9 Annual Performance Report 2024-25
Submit report by Caroline Cameron, Director (NAHSCP), on the Annual
Performance 2024-25 (copy enclosed).
10 NHS Ayrshire and Arran Delivery Plan 2025-2026
Submit for information NHS Ayrshire and Arran Delivery Plan 2025-2026 (copy
enclosed).
11 Strategic Planning Group Meeting Minutes
Submit for information the minutes of the Strategic Planning Group Meeting on
12 March 2025 (copy enclosed).
12 Urgent Items
Any other items which the Chair considers to be urgent.
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the Council's
internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the start
of the meeting, the Provost/Chair will confirm if all or part of the meeting is being
filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited to, for
the purpose of keeping historical records and making those records available via
the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you acknowledge
that you may be filmed and that any information pertaining to you contained in
the video and oral recording of the meeting will be used for webcasting or training
purposes and for the purpose of keeping historical records and making those
records available to the public. In making this use of your information the Council
is processing data which is necessary for the performance of a task carried out
in the public interest.
2

Page 3

If you have any queries regarding this and, in particular, if you believe that use
and/or storage of any particular information would cause, or be likely to cause,
substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
3

Page 4

IJB Sederunt
Voting Members
Joyce White (Chair) NHS Ayrshire & Arran
Cllr Margaret Johnson (Vice-
Chair)
North Ayrshire Council
Cllr Tom Marshall North Ayrshire Council
Cllr Anthea Dickson North Ayrshire Council
Cllr Nairn Angus-McDonald North Ayrshire Council
Linda Semple NHS Ayrshire & Arran
Tom Hopkins NHS Ayrshire & Arran
Marc Mazzucco NHS Ayrshire & Arran
Professional Advisors
Caroline Cameron Director
Eleanor Currie Interim Chief Finance Officer
Aileen Craig IJB Monitoring Officer
Iain Jamieson Clinical Director
Scott Hunter Chief Social Work Officer – North
Ayrshire
Thelma Bowers Mental Health Adviser
Darren Fullarton Associate Nurse Director/
Lead Nurse
Vacany Acute Services Representative
Dr Louise Wilson GP Representative
Sharon Hackney Lead Allied Health Professional
Lynne McNiven Public Health Representative
Wendy Van Riet Director of Psychological Services
Stakeholder Representatives
Lorna Sim Staff Rep - NHS Ayrshire and Arran
Lynda MacFarlane Staff Rep
Paul Smith Carers Representative
Clive Shephard Service User Representative
Vacancy Independent Sector Representative
Vicki Yuill Third Sector Representative
4

Page 5

North Ayrshire Health and Social Care Partnership
Minute of Integration Joint Board meeting held on 
Thursday 19 June 2025 at 10.00 a.m. 
involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation) 
Voting Members
Joyce White, NHS Ayrshire and Arran (Chair)
Councillor Margaret Johnson, North Ayrshire Council (Vice-Chair) (Chair) 
Councillor Nairn Angus- McDonald, North Ayrshire Council 
Professional Advisers
Caroline Cameron, Director of Health and Social Care Partnership
Thelma Bowers, Head of Service (Mental Health) (NAHSCP)
Eleanor Currie, Interim Section 95 Officer
Scott Hunter, Chief Social Work Officer 
Stakeholder Representative
Lynda McFarlane, Staff Representative
Lorna Sim, Staff Representative NHS Ayrshire and Arran 
Present (Remote Participation) 
Voting Members
Councillor Anthea Dickson, North Ayrshire Council 
Linda Semple, NHS Ayrshire and Arran
Marc Mazzucco, NHS Ayrshire and Arran 
Professional Advisers
Lynne McNiven, Public Health Representative
Wendy Van Riet, Director of Psychological Services 
Stakeholder Representative
Paul Smith, Carer Representative
Vicky Yuill, Third Sector Representative 
In Attendance (Physical Participation) 
Kerry Logan, Head of Service (Health and Community Care)
Michelle Sutherland, Partnership Facilitator (Health & Community Care)
Loretta Galloway, Unity Enterprise
Alastair Reid, Director of Allied Health Professions, NHS Ayrshire & Arran
Stephanie Gilfedder, AA Mental Health, NHS Ayrshire and Arran
Annie Johnston, Principal Manager (HSCP Business Admin)
Lauren McMath, Policy Officer (Children’s Services)
Agenda Item 3
5

Page 6

Karen Andrews, Team Manager (Governance)
Raymond Lynch, Senior Manager (Legal Services)
Ruth Wilson, Team Leader (Litigation)
Hayley Young, Senior Committee Services Officer
Mark Sugden, Communications Officer 
Apologies 
Councillor Tom Marshall, North Ayrshire Council
Tom Hopkins, NHS Ayrshire and Arran
Sharon Hackney, Lead Allied Health Professional
Darren Fullarton, Associate Nurse Director/ Lead Nurse
Iain Jamieson, Clinical Director
Aileen Craig, IJB Monitoring Officer 
1. Apologies for Absence and Chair Remarks 
Apologies for Absence were noted. 
The Chair welcomed Linda Semple as the new NHS Non-Executive Member of the
Integration Joint Board and thanked Sharon Morrow for her valuable contributions to
the work of the IJB. 
2. Declarations of Interest 
In terms of Standing Order 7.2 and Section 5.14 of the Code of Conduct for Members
of Devolved Public Bodies, Linda Semple declared she was a Non-Executive Director
for NHS Golden Jubilee, and Councillor Angus-McDonald declared he was Non-
Executive Director of Public Health Scotland. 
3. Minutes 
The accuracy of the Minutes of the meeting held on 1 May 2025 were confirmed and
the Minutes signed in accordance with Paragraph 7(10 of Schedule 7 of the Local
Government (Scotland) Act 1973. 
4. Director’s Report 
Submitted report by Caroline Cameron, Director (NAHSCP) on the developments
within the North Ayrshire Health and Social Care Partnership. 
The Director (NAHSCP) also provided an update on the NHS Renewal ambitions
described by the first minister in his speech on 27 January 2025. 
Officers responded to members’ questions on various aspects of the report. 
Noted. 
5. Children’s Services Plan Performance Report 2024-25 
Submitted report by Caroline Cameron, Director (NAHSCP) on the on the Children’s
Services Plan Performance Report 2024-25.  The Children’s Services Action Report
6

Page 7

2024-25 was set out at Appendix 1, Children's Services Performance Indicators
Report 2024-25 set out at Appendix 2 and the Whole Family Wellbeing Fund Annual
Summary Report set out at Appendix 3 to the report. 
Officers responded to members’ questions on various aspects of the report. 
Noted. 
6. Allied Health Professions within Acute Settings 
Submitted report by Alistair Reid, Director of Allied Health Professions, NHS Ayrshire
& Arran on Allied Health Professions within Acute Settings. 
Officers responded to members’ questions on various aspects of the report. 
Noted. 
7. Montrose House Care Home - Arran 
Submitted report by Kerry Logan, Head of Service (Health & Community Care) on the
outcome of the recent options appraisal for Montrose House. 
The Head of Service (Health & Community Care) advised that since the papers were
issued there was contact regarding the proposal, questions regarding the options
appraisal, consultation, engagement and impact assessment including consideration
for Islands impact.  Officers would undertake further work on those aspects and a
proposal brought back to the IJB in August 2025 for consideration and therefore the
Partnership was asked to consider only recommendation 4. 
Officers responded to members’ questions on various aspects of the report. 
The Board agreed to note (a) a further report would be brought to the IJB in August
2025; and (b) note the required pause on new admissions to Montrose House whilst
teams reconfigure service delivery in line with the new model of care. 
8. Older People’s Day Service Review 
Submitted report by Kerry Logan, Head of Service (Health & Community Care) on the
review of the delivery of day services for older people in North Ayrshire and the
proposed options to IJB to identify a service model for day services. The full review
was set out at Appendix 1 to the report. 
Officers responded to members’ questions on various aspects of the report. 
The Board agreed to (a) note the outcome of the older people’s day service review
completed in February 2025; (b) consider the option(s) detailed within this report for
future delivery and provide approval for the preferred option, noting the described
impact on service users and all other relevant stakeholders; (c) note the requirement
for a temporary pause on new day service admissions whilst teams reconfigure
service delivery and where possible accommodate any service users affected by
service change; (d) approve the preferred Option 2 as set out in the report; and (e)
note that the revised service model will undergo a formal evaluation six months after
reopening. The evaluation will assess the effectiveness of service delivery, the impact
on unmet need, and identify any further areas for improvement. 
7

Page 8

9. 2024-25: Year End Financial Performance 
Submitted report by Eleanor Currie, Interim Chief Finance Officer (HSCP) to provide
an overview of the Integration Joint Board’s financial performance for the year ended
2024-25 and the implications for the overall financial position.  Appendix A to the
report provided the financial overview of the partnership position, Appendix B provided
an overview of those service changes that have financial savings attached to them
and the BRAG status around the deliverability of each saving, Appendix C highlighted
the movement in the budget position following the initial approved budget and
Appendix D provided further details on the reserves. 
Officers responded to members’ questions on various aspects of the report. 
The Board agreed to (a) note the overall integrated financial performance for the
financial year 2024-25 and the overall year-end overspend of £1.212m pre
earmarking, adjusted to £3.593m after earmarking, adjusted to on-line after additional
funding contributions; (b) note the progress with delivery of agreed savings; (c)
approve the budget reductions detailed at paragraph 2.10; and (d) approve proposed
earmarking as detailed in the report, leaving a balance of £3.161m in earmarked
funds. 
10. Risk Appetite Statement 
Submitted report by Eleanor Currie, Interim Chief Finance Officer (HSCP) on the IJB
Risk Appetite Statement set out at Appendix 1 to the report. 
Officers responded to members’ questions on various aspects of the report. 
The Board agreed to approve the IJB Risk Appetite Statement set out at Appendix 1 to
the report. 
The Board noted that a further report would be brought to a future meeting. 
11. Risk Management Strategy 
Submitted report by Eleanor Currie, Interim Chief Finance Officer (HSCP) on the IJB
Risk Management Strategy set out at Appendix 1 to the report. 
The Board agreed to approve the IJB Risk Management Strategy set out at Appendix
1 to the report. 
The meeting ended at 12.15 pm. 
The full meeting proceedings can be viewed at 
https://north-ayrshire.public-i.tv/core/portal/home
8

Page 9

Integration Joint Board
21st August 2025
Subject : Director’s Report 
Purpose : This report is for awareness to advise members of North
Ayrshire Integration Joint Board (IJB) of developments within
North Ayrshire Health and Social Care Partnership (NAHSCP) 
Recommendation : IJB members are asked to note progress made to date. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
IJB Integration Joint Board
HSCP Health and Social Care Partnership
ADHD Attention Deficit Hyperactivity Disorder
ASD Autism Spectrum Disorder
MWC Mental Welfare Commission
NES NHS Education in Scotland
IPU Inpatient Unit
SDS Self Directed Support
RAMH Recovery Across Mental Health 
1. EXECUTIVE SUMMARY 
1.1 This report informs members of the Integration Joint Board (IJB) of the work
undertaken within North Ayrshire Health and Social Care Partnership (NAHSCP),
nationally, locally and Ayrshire wide. 
2. BACKGROUND 
2.1 This report provides IJB with up to date information on recent activity across the HSCP
since the last IJB.    The report will also provide COVID related information by
exception. 
Agenda Item 4
9

Page 10

3. CURRENT POSITION 
National Developments 
Consultations/Call for Views 
3.1 Children (Care, Care Experience and Services Planning) (Scotland) Bill -
Organisations, public bodies academic 
On Tuesday 17th June the Children (Care, Care Experience and Services Planning)
(Scotland) Bill was introduced. 
The introduction of this Bill is a significant milestone and will be instrumental in
accelerating progress toward Scotland’s commitment to our care community. The
eight key areas that the Bill addresses are: 
• Extension of eligibility to receive Aftercare support to young people who have
been in care prior to their 16th birthday.
• Introduction of a right to advocacy for children, young people and adults with
care experience.
• Actions to improve the language of care, including a universal definition of ‘care
experienced’ 
• Legislative steps to tackle profit from residential care
• Strengthening the not-for-profit principle in relation to foster care 
• Introduction of a national register for foster carers 
• Redesign of the Children’s Hearing’s System, and
• Extension of the statutory responsibility to Integrated Joint Boards in the
development of Children Services Plan 
The changes included in this Bill are only part of the wider work being undertaken
across Scotland to keep The Promise. Work continues at national and local level.  The
Education, Children and Young People Committee will be the lead Committee as the
Bill passes through Parliamentary scrutiny, and they have now issued their call for
evidence which will be open until the 15 August. This can be found on the Parliament
website.   
A North Ayrshire draft response has been submitted to the Committee.  The
Committee also intend to take oral evidence in Parliament and Scottish Government
have advised of the intention to arrange a series of in-person collaborative sessions
and group discussions to gather feedback and share ideas.   
3.2 Call for Evidence : ADHD and ASD Pathways and Support 
Ahead of its inquiry into ADHD and ASD pathways and support, the Health, Social
Care and Sport Committee has launched a call for evidence to hear the views and
experiences of organisations providing support, advice, and treatment in this area. 
10

Page 11

The inquiry seeks to – 
• understand why waiting times for diagnosis and management of ADHD and
ASD are reportedly long, including the drivers of increasing demand
• understand how these conditions are diagnosed and managed
• understand the impact of delays on individuals
• explore solutions to improve capacity of services, referral pathways and
support. 
The consultation is open until 18 August 2025.  More information on the inquiry can
be found on the Scottish Parliament’s website - ADHD and ASD pathways and support
Scottish Parliament Website. 
3.3 Call for Views : Commissioner for Older People (Scotland) Bill 
The Equalities, Human Rights and Civil Justice Committee has launched an online
call for views on the Commissioner for Older People (Scotland) Bill. 
The purpose of the Bill is to establish a Commissioner for older people in Scotland
whose primary purpose would be to promote and safeguard the rights and interests
of older people (defined as those who are aged 60 and over). This role would be
independent from the Scottish Government. 
The call for views is open until 12 September 2025. 
3.4 Mental Welfare Commission Annual Report 2024-25 
The Mental Welfare Commission’s published their annual report which shows the wide
range of work the organisation completed last year, including visits to 149 wards and
units around the country, meeting individuals, families, and staff. 
In 2024-25, the Commission published a report on the care
and treatment of people with learning disabilities and
complex care needs who had remained in either a learning
disability or mental health hospital for more than 10 years,
and closure reports on compulsory community treatment
orders, mental health in Scotland’s prisons, and an
investigation into the care and treatment of Mr E. 
The report provides an overview of the MWC activities,
achievements, and the progress they have made in
promoting and safeguarding the rights of individuals with
mental health issues across Scotland. 
11

Page 12

3.5 Psychological Therapies and Interventions Workforce Census 
NHS Education for Scotland (NES) and the Scottish Government, along with other
stakeholders, are gathering information to understand the current provision of
psychological therapies and interventions for the Scottish population through a
workforce census.   
Psychological interventions and therapies aim to directly reduce distress and improve
the wellbeing and mental health of the population we serve. The census aims to
understand the current workforce capacity and provision in delivering enhanced and
specialist interventions and therapies. 
3.6 Events to raise awareness of new Pension Age Winter Heating Payment 
Pension Age Winter Heating Payment is replacing Winter Fuel Payment in Scotland
this year, with 860,000 Scottish pensioners with an income of £35,000 or less
expected to receive the payment. 
To support the new benefit launch, Social Security Scotland is hosting online events
to share information on the financial support available for Scottish pensioners. These
free events, which will be held via MS Teams, may be of particular interest to staff
who provide advice and support to older people of state pension age or above in
Scotland, ensuring they have all the relevant information to raise awareness of the
financial assistance available to help pensioners heat their homes this winter. 
Ayrshire Wide Developments 
3.7 Celebrating innovation, integration and impact in Ayrshire 
NHS Ayrshire & Arran held its Quality Improvement Conference on Monday 14 July
2025 at the Alexander Fleming Education Centre, Crosshouse Hospital.  This annual
event offers a chance to celebrate the wide range of improvement initiatives designed
to enhance care, safety, and experience for patients and staff alike. 
A total of 44 poster entries were received this year, including contributions from
medical staff, nursing teams, pharmacists and allied health professionals, with the
submissions reflecting the rich diversity and collaborative spirit of improvement work
happening across NHS Ayrshire & Arran. 
The conference was extremely well attended, with excellent engagement from staff at
all levels and professions. The energy and enthusiasm on the day was a clear
testament to the ongoing commitment to quality, safety and innovation across Ayrshire
and Arran services.  Our NEST team, won an award on the day for their poster
detailing the NEST Empowerment Model. 
12

Page 13

3.8 Ayrshire Hospice – Services return to Ayr site 
Ayrshire Hospice services have now returned to its site at Racecourse Road, Ayr,
following the successful completion of its capital build project. 
The redevelopment enhances the environment for patients, families and professionals
alike, with facilities including a modern new inpatient unit (IPU), a connected hub
building, and restored heritage spaces - all designed to support compassionate,
dignified, and person-centred palliative and end of life care. 
Key information for health and social care professionals:
• In-patient unit and on-site services are operating from Racecourse Road once
again
• Living Well services are also based back at Racecourse Road (and
supplemented by hubs at the Dirrans Centre, Kilwinning; The Carrick Centre,
Maybole, and the FABS Clinic
• Community teams continue to provide support across Ayrshire and Arran as
before (including the Ayrshire Hospice social work team) 
North Ayrshire HSCP congratulate the Hospice on meeting this key milestone and
look forward to continuing to work in partnership. 
3.9 Ayrshire Suicide Prevention Community Champion Awards 
The Ayrshire Suicide Prevention Community Champion Awards is a new initiative
designed to honour the outstanding efforts of local volunteers and third sector
organisations who are making a real difference in mental health and suicide
prevention. 
Categories to choose from are as follows, and you can nominate as many people as
you like.
• Care and Compassion: This award is for individual volunteers or groups who
have demonstrated care and compassion towards other individuals, groups or
peers with exceptional care, compassion, dignity and respect. 
• Shining Stars: Individuals, teams or volunteers who stand out in some way in
terms of their contribution and achievement, and/or going the extra mile, with
examples of how they have done this and the impact they have had.
• Thinking out of the Box: Individuals/teams who have done something new or
different, delivered innovation, reform, a surprising or left field solution, or found
solutions ‘against all the odds’ – with examples of what they have done and the
impact it has had.
• Collaboration and Working Together: Teams who have demonstrated
exceptional team working, collaboration, working across boundaries,
connectedness etc (this does not need to have been a long piece of work), with
examples of what they have done and the impact it has had.
13

Page 14

• Making a Difference with Digital: Examples of thinking and/or doing things
differently using digital - improvements, innovations, new approaches and
ideas etc. It could be something delivered with the support of digital services,
or something locally initiated and delivered. 
Nominations closed on Friday 8 August, and the winners will be announced at an
awards ceremony to be held at WG13 in Kilmarnock on Thursday 11 September. 
3.10 Award of Self-directed Support (SDS) Contract 
The Professional Standards (Self-directed Support) Team are pleased to announce
the award of the new SDS: information and advice service contract aimed at
enhancing the delivery of independent, personalised options for care and support
across the Ayrshire communities.  Following a robust procurement process led by
North Ayrshire, the contract has been awarded to Ayrshire Independent Living
Network who demonstrated their commitment to empowering people to make
informed choices and take control of their own support arrangements.  This pan
Ayrshire contract will support the delivery of high quality, person centred information,
advice and recruitment services that align with the principles of choice, dignity and
independence. 
The new contract commenced on 1st August 2025.  We are confident this partnership
will bring meaningful improvements to those requiring social care support and we look
forward to working with Ayrshire Independent Living Network to deliver positive
information, advice and outcomes for people and their families across Ayrshire. 
3.11 Community Partners Spotlight: Community Brokerage Network 
The Community Brokerage Network provides free
information and advice on Self Directed
Support (SDS) for everyone in Ayrshire, regardless of
their circumstances, age, and level of ability.   
A Community Broker is someone who helps people
find their way through the social care system, with
detailed local knowledge and strong connections that
can help individuals access the services, community
opportunities and resources that fit their unique needs
and preferences. 
The service is fully funded by the Scottish Government and is free of charge to use.
No formal assessment or social care budget is required in order to access the service,
which is open to:
• Those who are unsure if they qualify for social care and don’t know where to
start
• Those who have been told they don't qualify for formal support and need help
to explore other options
14

Page 15

• Those waiting for a needs assessment after contacting social work
• Those who are struggling to get the right support with an allocated care
package
• Those who need help reassessing their support due to changing needs
• Unpaid carers looking for support for themselves or a loved one 
The Community Brokerage Network has recently updated its SDS information booklet,
client charter and data privacy policy. 
3.12 Launch of new Mental Health Services Carers Forum 
A new Mental Health Services Carers Forum launches later this month, which is open
to unpaid carers from across the whole of Ayrshire.  These sessions will be held on
the last Wednesday of the month, offering a chance to hear from a wide range of
support services, share your views, and meet others in similar situations. 
Organised by NAHSCP, in conjunction with Carers Gateway North Ayrshire, Carers
Gateway South Ayrshire, East Ayrshire Carers Centre, VoiceAbility and East Ayrshire
Advocacy Services, the sessions will include guest speakers from a range of
organisations. 
Forum events will take place for the remainder of this year as follows: 
Wednesday 27 August: 12.30pm to 2.30pm at Fullarton ConneXions, Irvine (with
information from North Ayrshire Money Smart and Arran CVS on finances, benefits,
and community mental health and wellbeing supports)
Wednesday 24 September: 5pm to 7pm at the Beehive, Woodland View Hospital,
Irvine (with information from North and East Ayrshire Carers Gateways on carers
rights and entitlements)
Wednesday 29 October: 12.30pm to 2.30pm at the Carers Cottage, Kilmarnock (with
information from AILN and the Community Brokerage Network on self-directed
support)
Wednesday 26 November: 5pm to 7pm at the Beehive, Woodland View Hospital,
Irvine (with information from VoiceAbility and East Ayrshire Advocacy Services on
advocacy support) 
For any additional information, email mentalhealthengagement@north-
ayrshire.gov.uk 
15

Page 16

North Ayrshire Developments 
3.13 Carers Community Fund Applications 
Carers Gateway North Ayrshire has announced the launch of a new Carers
Community Fund, aimed at empowering local organisations to better support unpaid
carers throughout the region. 
The fund offers grants of up to £2,000 for activities, events or projects that aim to
benefit unpaid carers living in North Ayrshire. The funding is open to groups, charities
and communities, and will be distributed by the North Ayrshire Carers Champions
Board. 
Applications closed on Friday 15 August, with funding to be distributed by the end of
September. All funded projects must be completed and money spent by March 31,
2026. Successful applicants will be required to complete an end-of-grant evaluation
and provide evidence of expenditure. 
3.14 Sponsored walk success for staff and service users of Dirrans Centre 
Staff and service users of the
Dirrans Centre took part in a
sponsored walk for the Ayrshire
Hospice on Friday 18 July, raising
over £850 for the charity to date
through their Just Giving page and
cash donations. 
The centre runs twice-weekly Health
Walks for service users undergoing
periods of rehabilitation, with a walk
of 1km to 3km on Tuesdays, and a
longer walk of 4km to 5km on
Fridays. These not only help to improve physical and mental wellbeing, but also offer
an important opportunity for social connection. 
The group members expressed an interest in doing a sponsored walk again this year
for the Ayrshire Hospice, with the charity being close to the hearts of many. A total of
17 service users took part in the event, joined by volunteers and rehab staff. 
3.15 Learning Disability Service Launch of New Exhibition 
Over the first half of this year, our Learning Disability Service has been a collaborator,
along with Scottish Care, in a project led by the Scottish Commission for People with
Learning Disabilities and funded by the Scottish Government. The project was
intended to generate learning and resources which would help to promote digital
inclusion and access to technology for people with learning disabilities. 
16

Page 17

With the support of a diverse range of local stakeholders,
the early stages of the work involved asset mapping of
digital inclusion activity in North Ayrshire, undertaken by
Care Connector Cheryl Stevenson. Later stages of the
work saw a design team - including Ute Shauberger from
Opencast and interns from the Glasgow School of Art -
building on this learning and working with Cheryl and others
to develop practical resources to support conversations
around digital/tech opportunities, as well as guidance for
services around delivering digital inclusion.   
Those involved in the project, including the clients who
participated in co-design sessions, have generated a novel
set of practical and strategic resources, which the team is
excited to share at an exhibition to be held at the Harbour
Arts Centre, Irvine, in August.  The exhibition was launched at the Harbour Arts Centre
Irvine on 8th August.   
3.16 Dementia Support Service Inspection 
Our HSCP Dementia Support Service were inspected in July and feedback received
by the Care Inspectorate saw the grades rise from Good (4) to Very Good (5) across
the undernoted areas :- 
1.3  Relationships – Very Good (5)
2.2  Quality Assurance – Very Good (5)
3.3  Staffing Arrangements – Very Good (5)
5.1  Care Planning – Very Good (5) 
Congratulations to the service for the very positive inspection outcome. 
3.17 Dirrans Centre 
Following on from its Referrer’s Open Day last month, the Dirrans Centre opened their
doors to members of the public who feel they may benefit from a period of
rehabilitation on 11th July 2025. 
The event provided an opportunity to :
• Meet the team
• Learn about the rehabilitation workshops currently available
• Hear directly from service users about their experiences
• Complete a referral form if interested in accessing support 
17

Page 18

The Dirrans Centre offers rehabilitation support to individuals living with:
• Long-term health conditions
• Physical disability
• Brain injury
• Neurological conditions 
To be eligible, individuals should:
• Have a rehabilitation goal
• Be able to participate in an initial 12-week rehabilitation programme (with
further support options explored afterwards)
• Be able to travel to and from the centre independently 
3.18 Celebration of learning at RAMH Wellbeing & Recovery College 
RAMH Wellbeing & Recovery College hosted a vibrant end-of-term celebration of
learning at Saltcoats Town Hall recently. With a theme of ‘Rediscovery’, the event
brought together students, peers, staff and partners to recognise the transformative
impact of learning on mental health recovery. 
The day began with an exhibition of student artwork, followed by reflections from
RAMH CEO Peter Jung and guest speakers. Keynote speaker Suzie Baines spoke
about reconnecting with inner strength as part of healing, and the Scottish Recovery
Network highlighted the value of peer support. 
Students shared deeply moving stories of recovery, including a couple who spoke
about the positive impact their learning journey has had on their family. Others
reflected on courses like Story Trees, drama and creative writing, with performances
and poetry bringing their experiences to life.     
The event closed with a joyful graduation ceremony celebrating each student's
courage, creativity and commitment. 
Recovery College Coordinator
Lainey McKinlay said: “In a world
that often focuses on what people
lack, this celebration was a
powerful reminder of what people
can reclaim and rediscover -
confidence, creativity, connection
and hope.”
To learn more about the RAMH
Wellbeing & Recovery College,
visit the RAMH website or call
01294 447355. 
18

Page 19

4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None 
4.5 Risk
None
4.6 Community Wealth Building
None
4.7 Key Priorities
None
5. CONSULTATION 
No specific consultation was required for this report. User and public involvement is
key for the partnership and all significant proposals will be subject to an appropriate
level of Consultation.   
Caroline Cameron, Director
[Carolinecameron@north-ayrshire.gov.uk/01294 317723] 
Appendices
Nil
19

Page 20

20

Page 21

Integration Joint Board
21st August 2025
Subject: 2025-26 – Month 3 Financial Performance 
Purpose: To provide an overview of the IJB’s financial performance as at
Month 3 (June). 
Recommendation: It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2025-26 and the current overall projected year-
end overspend of £5.187m reducing to £1.175m after planned
recovery actions;
(b) notes the progress with delivery of agreed savings;
(c) approves the actions which are being taken to progress
financial recovery and that an updated recovery plan will be
presented to the next IJB; and
(d) notes the remaining financial risks for 2025-26; 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
MDT Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework
MDT Multi-Disciplinary Team 
Agenda Item 5
21

Page 22

1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of June further work is undertaken following the
month end to finalise projections, therefore the projected outturn position is as current
and up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £5.187m (1.5%) reduced to
£1.175m through already identified financial recovery actions.    There is an
increasing risk to achieving financial balance during 2025-26, the projected outturn
position is summarised below with the residual risk following already identified
financial improvement actions: 
TOTAL Health/  
NHS AA
Social
Care/NAC
Projected Overspend @ mth3 5.187 2.271 2.916
Financial Recovery Plan Projections (4.012) (1.752) (2.260)
Residual Risk 1.175 0.519 0.656 
The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds. 
The projection assumes all mitigations and controls established in 2024-25 continue
throughout 2025-26 as it is recognised that the same uncertainty and risks remain
into 2025-26 and there needs to be tight grip and control over expenditure overall. 
1.3  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical disability care packages, supplementary
staff in wards, staff costs in Montrose House and Unplanned Activities (UnPACs)
within the lead partnership for mental health. 
1.4 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The overspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism.  There is a requirement for the 3 IJBs to be
aware of the position for Lead Partnership services and plans to deliver services from
22

Page 23

within allocated budget, on that basis further information will be brought forward with
further detail on Lead Partnership services. 
1.5 Since the setting of the budget in March 2025 the 2025/26 financial position has been
adversely impacted by the below factors out-with the control of the IJB. 
• National Care Home Contract (NCHC) – the recent increase to the NCHC rate
to reflect the impact of the nursing pay award resulted in an additional
unfunded cost of £0.175m.
• NHS Board allocation for the Employers National Insurance increase
confirmed at 60% of funding – full year impact £0.664m 
• The current allocation for the Agenda for Change costs in relation to the
reduced working week are currently being queried with the NHS finance team
to ensure we receive our ‘fair share’ of the funding.  The current funding
allocated is £0.659m, the cost of covering all reduced hours is £1.497m,
currently calculating actual cover costs and will request NHS AA review
funding allocation.
• Pay settlements for both NHS and Local Government staff have been agreed
for 2025/26, the current assumption is that the shortfall between budget
planning assumptions and actual settlements will be fully funded. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery. 
2.2 FINANCIAL PERFORMANCE – AT MONTH 3 
At month 3 against the full-year budget of £342.146m there is a projected year-end
overspend of £5.187m (1.5%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £2.916m in social care services and a projected
overspend of £2.271m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
Appendix F provides information on the costs of bank and agency staff. 
23

Page 24

2.3 Health and Community Care Services 
Against the full-year budget of £98.721m there is a projected overspend of £4.124m
(4.2%) and the main variances are: 
a) Care home placements – net projected overspend of £0.060m. This includes a
provision for an average of 7 interim beds and reflects the recent increase to the
NCHC to reflect the impact of the nursing pay award resulted in an additional
unfunded cost of £0.175m.   
The budgeted number of permanent placements was 765 and at month 3 there
were 783 placements resulting in a projected overspend of £0.616m. 
The plan to manage down the number of permanent placements to reach the
target is challenging due to the need to minimise delayed discharge from hospital
and to continue to support those in critical and substantial need in the community. 
The overspend is partially offset by income recovered from charging orders which
is projected to be £0.556m over recovered. This income is challenging to predict
as it depends on the length of the legal process and time taken to sell the property
that the charging order is registered to. 
b) Care at home is projected to be £1.641m overspent. The position reflects the cost
of meeting the significant demand and level of provision for care at home support.   
c) Physical Disability Services – projected overspend of £0.923m split as follows:
£1.268m over in residential placements, £0.178m under in direct payments and
£0.167m under in community care packages. 
d) Integrated Island Services is projected to overspend by £0.266m.  The most
significant variance is a projected overspend at Montrose House of £0.189m 
which relates to the net overspend on agency staff (i.e. net of underspend on
employee costs) and overspends across property, continence and medical
supplies, admin and transport.   Arran Patient Transfer contract is projected to
overspend by £0.040m. 
e) Specialist Rehab wards – projected overspend of £0.214m (Redburn ward
£0.253m overspend and Douglas Grant £0.039m underspend).  The overspend
is due to cover costs for vacancies as well as supplementary staffing for patients
who require one to one support. 
f) Wards 1 and 2 – Projected overspend of £0.827m. The overspend is due to
increased use of supplementary staffing.   All rehabilitation wards are operating
at 100% occupancy supporting a high level of patient needs/complexity, which
places pressure on staffing levels and the use of bank and agency staff to support
additional patient observations.   The senior manager has developed an action
24

Page 25

plan which will reduce this overspend and the reduction is reflected in the
recovery plan. 
g) District Nursing – projected to overspend by £0.100m mainly due to an overspend
on continence supplies. 
2.4 Mental Health Services 
Against the full-year budget of £114.884m there is a projected overspend of £0.940m
(0.8%) prior to the re-allocation of the Lead Partnership variance to East and South
HSCP.   
The main variances are:
• Learning Disabilities are projected to underspend by £0.424m mainly due to
community care packages (£0.886m under), direct payments (£0.335m over)
and residential placements (£0.064m over).  This improvement reflects the
positive impact of assertive reviews of care packages and increased
clawbacks from direct payments.
• Community Mental Health services are projected to underspend by £0.095m
across community care packages (£0.527m under), direct payments
(£0.168m over), residential placements (£0.381 over) and Nethermains
(£0.103m under). The main reason for underspend in community packages is
the availability and capacity of adult community providers to deliver new
packages of care.
• There is a projected underspend of £0.353m in relation to the cost of Hospital
Based Complex Continuing Care (HBCCC), this reflects the impact of change
in provision for these services.  There were plans to reinvest this in the service,
but these plans are on hold as the funding is needed to contribute to the
recovery plan.
• The Lead Partnership for Mental Health is projected to be £1.806m overspent
and the main variances are as follows: 
• Adult Inpatients – projected overspend by £0.372m due to overspends
in supplementary staff for enhanced observations (1:1 and 2:1) and use
of bank staff. There is an overspend of £0.159m at month 3 but this is
partially offset by a recharge to another HSCP on a cost basis for an
outwith authority placements which has incurred additional costs in
relation to usage of supplementary staffing due to sustained enhanced
observations. There is a favourable impact from the opening of the
adult mental health assessment hub which has seen the adult inpatient
areas with reduced occupancy. 
• The UNPACS (Unplanned Activities) budget – projected overspend of
£1.369m based on current placements. This reflects two new
placements agreed at the high-cost care package group in July 2025. 
UnPACS placements are for individuals with very specific needs that
25

Page 26

require a higher level of security and/or care from a staff group with a
particular skill set/competence.  There are no local NHS secure
facilities for women, people with a learning disability or people with
neurodevelopmental disorder. This can necessitate an UNPACs
placement with a specialist provider which can be out-of-area.  The
nature of mental health UNPACs spend is that it is almost exclusively
on medium- or long-term complex secure residential placements which
are very expensive so a small change in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions
between units or levels of security can take many months. Applications
to approve a placement are made to the Associate Medical Director for
Mental Health who needs to be satisfied that the placement is
appropriate and unavoidable prior to this being agreed. 
• Learning Disability Services – projected to overspend by £0.101m. 
This relates to the potential delays in achieving the saving from
Trindlemoss moving from a nursing to social care model.  The progress
with this was impacted by the requirement to close Ward 7A.   It is
assumed that Ward 7A will be online as the use of bank staff will
reduce. 
• Elderly Inpatients – projected overspend of £0.264m due to the use of
supplementary staffing.  The elderly mental health wards continue to
operate at full occupancy and at times with waiting lists, with several
patients who are on enhanced observations and bank costs remain
high. 
• Eating Disorders – projected to overspend by £0.129m due to the
staffing level being higher than the funding allocation.  This is being
considered alongside the overall resource allocation. 
• Enhanced Mental Health Outcome Framework – following the 2024/25
review there was £0.275m of unallocated funds. These were to be
reinvested this in the service, but these plans are on hold as the funding
is needed to contribute to the recovery plan. 
• Psychiatry – is projected to overspend by £0.269m mainly due to junior
doctor costs. A mitigation plan is being developed and the rota for junior
doctors is being reviewed. 
• MH Pharmacy – is projected to overspend by £0.396m due to
increased demand and cost of medicines and in particular the cost of
Buvidal.  This overspend is after investing £0.510m on a Pan Ayrshire
basis (£0.170m per HSCP). 
26

Page 27

• Action 15 – is projected to overspend of £0.268m due legacy costs from
the 2024/25 review of funding.  There are £0.487m of reserves held for
this and these will be requested as part of the recovery plan. 
 Innovation Fund – projected underspend of £0.025m assuming that the
posts to be redeployed as part of the EMHOF review are actioned. 
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £0.701m in
2025-26.  Further information is included in the table below: 
Vacancy Savings Target (£1.160m)
Projected to March 2026 £1.861m
Over/(Under) Achievement £0.701m
2.5 Children and Justice Services 
Against the full-year budget of £45.781m there is a projected overspend of £2.530m
(5.5%) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£2.857m. Some of these costs are offset by the contribution from the Home Office
for Unaccompanied Asylum-Seeking Children which is detailed below. The main
areas within this are noted below: 
• The children’s residential placements are projected to overspend by £2.728m
based 32 placements in month 3. This demonstrates an increase of 4 places
since the start of the financial year. There are a number of factors leading to
this challenging position: 
o We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy or over for some
time, leading to increased use of external placements where residential
care is required.
o There remains an acute shortage of foster carers leading to residential
care being necessary in emergency placement situations. 
o The requirement to support Unaccompanied Asylum-Seeking Children
(UASC) under the National Transfer Scheme and to support trafficked
young people who have been identified in North Ayrshire.
o A number of young people in residential care have requested Continuing
Care, whereby a young person can remain in their placement until age
21.
o Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases is
shared 50/50 with Education services. 
27

Page 28

o Contractual inflation has still to be agreed for the majority of placements
and it is likely that this will increase the projected costs of residential
places which is outwith the control of the service.
o Children’s Services are continuing to work with other services including
Education and Housing to address the challenges through the work of the
‘Brighter Pathways’ Programme Board and associated workstreams. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.919m underspent. 
• Children with disabilities – there is a net projected overspend of £0.866m
across residential placements (£1.312m over), direct payments (£0.312m
under) and community packages (£0.134m under). 
• Residential respite – placements are overspent by £0.073m. These short-
term placements are used to prevent an admission to full time care or to avoid
placement breakdown. 
• Employee costs – are projected to overspend by £0.150m, largely due to
staffing levels in the children’s houses and regrading of posts. 
• Care Leavers – projected underspend of £0.071m in rent costs. 
• Section 29 Payments (Throughcare Team) are projected to overspend by
£0.064m. 
b) Head of Service – is projected to underspend by £0.548m. This consists of a
projected overspend of £0.196m to the previous saving in relation to the staff
reconfiguration in the children’s houses which was not achieved in 23-24 or 24-
25 and this is offset by the grant funding in relation to Unaccompanied Asylum-
Seeking Children (UASC), which is projected to amount to £0.792m and which
contributes to costs incurred across a number of C&F service areas.   
c) C&F Health Team – is projected to overspend by £0.121m mainly in relation to
the Band 6 to 7 regrade for Health Visitors and the progression of posts up the
Band 7 scale.  Part of this recurring cost has been incorporated into budget
pressures for 2025/26. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
28

Page 29

2.7 CHIEF SOCIAL WORK OFFICER 
This is projected to underspend by £0.205m.  The carers contract is projected to
underspend by £0.050m and there is an over-recovery of income in Learning and
Development for social work student placements. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.115m and the
main areas of variance are: 
• There is projected slippage on the LD and MH transition funding of £0.246m 
due to delays in children transitioning into adult services. This involves
complex planning by services with service users and families and can change
over time based on assessed need when moving into adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   
• There is also a balance of overachieved savings of £0.061m as a result of the
25/26 budget decision 
• NHS shortfall in savings of £0.406m which is not coded to specific areas and
held centrally until recurring savings can be identified.
• An over-recovery of payroll turnover of £1.200m for social care services and
an over-recovery of £0.403m for health services as outlined in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (£3.400m) (£1.567m)
Projected to be achieved by March
2026
£4.600m £1.970m
Over/(Under) Achievement £1.200m £0.403m 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.  
As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. 
For 2025/26 there will be a further recruitment delay with vacancy scrutiny approved
vacancies being held for four weeks before they are advertised to create more payroll
turnover.  This will be for all vacancies except clinical or registered services
vacancies or those which will incur cover costs. 
29

Page 30

The turnover target for the North Lead Partnership for Mental Health services is
detailed separately within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2025-26 budget included £4.019m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 3
£m
Red - -
Amber 2.984  2.148
Green 1.035 0.998
Blue - 0.873
TOTAL 4.019 4.019 
b) The main area to note is that the shortfall in the day care saving – the
recommendations following the Older People’s Day Service Review were
presented to the IJB in June 2025. The IJB supported a proposed model of
day services which does not deliver the full savings target with a shortfall of
£95k.  The savings target will be re-adjusted for future monitoring.  
c) The Chief Officer presented a proposal to the Joint Staffing and Recruitment
Panel in June 2025 to revise the leadership structure for the IJB finance team
which includes the removal of the Head of Service position.  These supported
changes will deliver a saving of £101k which will be added to the plan and
compensate for the reduction in recurring savings from the day care review. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount (£000)
1 ICT Budget Transfers (0.005)
2 Development of People working in Childrens SW –
Children’s Social Care Uplift for Commissioned Services (0.390)
30

Page 31

3 Prescribing CRES (saving) (0.715)
4 Training Grade Adjustment – April and May (0.071)
5 NAHSCP contribution to pan Ayrshire Vision Support
Service (South Lead) (0.005)
6 NAHSCP contribution to Pan Ayrshire Community Store
(South Lead) (0.155) 
2.11  Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis. 
The outturn in relation to North Lead Partnership services is not fully attributed to the
North IJB as a share is allocated to East and South Partnerships; similarly, the impact
of the outturn on East and South led services is shared with North. At Month 3 the
MH lead partnership is projected to overspend by £1.806m (£0.591m NRAC share
for East and £0.517m for South). 
South HSCP (month 3 info) – projected overspend of £0.134m of which £0.050m
will be allocated to North. The variance is mainly due to an overspend of £0.080m in
the community store.  This includes the costs of replacing mattresses, repairs and
maintenance contract and equipment costs. There is also a projected overspend of
£0.058m in the Family Nurse Partnership as the SG funding was based on the mid-
point of the salary scale and all post are now at the top point of the scale.  This will
be a pressure in 2026/27. 
East HSCP (month 2 info) - projected overspend of £0.106m (of which £0.040m will
be allocated to North). The main variances are: 
• Primary Care (including Dental) projected overspend of £0.673m. This is due
to increased spend on Primary Care Contracting and Support £0.408m,
mainly due to ongoing additional costs in Diabetic Retinopathy, additional
Consultant costs and additional costs at Community Hospitals. In addition,
there are projected increased costs in Primary Medical Services £0.581m due
to additional staffing costs, as well as in Ayrshire Urgent Care Services
£0.047m. These additional costs are partially offset by staffing savings in
Dental services £0.363m. 
• There are projected additional costs in Prison and Police Healthcare £0.093m,
mainly due to prescribing. 
• The projected overspend in Other Lead Services £0.116m, relates to
additional staffing costs in Area Wide Evening Services. Work is being
undertaken to continue to reduce costs in the current year. 
• The additional pressures in Lead Partnership services highlighted above are
partially offset by staffing savings in pan-Ayrshire Allied Health Professions
31

Page 32

Services £0.774m. This is based on current vacancies however this will
potentially reduce over the course of the year as posts are recruited to. 
Overall, East Ayrshire hosted services are projected to overspend by £0.106m at this
early stage of the financial year. Work will be undertaken to reduce costs in areas
overspending within hosted services over the course of 2025/26. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.            
Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how these compare to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive.  
The HSCPs require to agree their final share of the baseline with each other,
however the aggregate will remain unchanged. The table below shows the cost of
the historic baseline at 2024/25 prices. The 2025/26 actual usage information is not
known until later in the year.   
IJB
Baseline at
2024/25
prices      
(£)
East 31.870
North 39.966
South 34.488
Total 106.324  
The annual budget for Acute Services is £485.7 million.  The directorate is
overspent by £7.4 million after 3 months. 
This was caused by overspends on medical and nursing staff, together non pay
overspends on equipment and supplies. These are required due to the level of
operational pressure experienced. Unfunded beds contributed an overspend of £1.7
million after 3 months. 
Within the overall £7.4 million overspend Medicine are over by £3.0 million,
Emergency Care by £2.7 million, Surgery by £0.7 million, Labs and Diagnostics by
£1.2 million and Women and Children by £0.6 million. Underspends on other budgets
of £0.8 million make up the difference. 
32

Page 33

There is a material underlying deficit caused by: 
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and
Arran acute hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
In respect of Lead Partnership Services, the 3 Chief Officers and CFOs have met to
consider improvements in the reporting and visibility of financial and operational
performance for those services which we lead or are led by another HSCP.  Actions
have been agreed to develop more regular shared information to be shared across
all 3 IJBs with an intention to incorporate this further detail into future financial
monitoring reports during 2025/26.   
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position. 
• Current overspend areas, especially in low volume / high-cost services e.g.
Children’s residential placements, UNPACs, and supplementary staffing
across community, mental health and learning disability wards.
• Growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• Both NHS and Local Government pay awards are settled, these are both
higher than the budget assumptions for 2025-26, if the pay awards are not
fully funded then this will present an in-year cost pressure.
• Unearmarked reserves are depleted, there is no scope to absorb in-year
variances, with any overspends requiring additional funding from partners.
• The ongoing review of the Integration Schemes, where there is a focus on
financial arrangements and risk share. 
• The wider system financial challenges and impact across the whole system,
for example the financial position of NHS AA and the decisions taken to
reduce the Board’s deficit may have impacts on other parts of the health and
care system. 
33

Page 34

• Removal of brokerage for NHS Boards, NHS AA have been asked by Scottish
Government to deliver further financial improvement beyond their Board
approved financial plan. 
• The overall sustainability of commissioned care providers, with eNICs
compounding historic challenges re financial sustainability, there is a
heightened risk of provider failure leading to handing back of care and
contracts.
• The ongoing ability to source packages of care for service users.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The use of supplementary staffing for enhanced observations across a
number of service areas and the use of high-cost agency staff to support
frontline service delivery in areas where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. 
• Scot Excel inflationary increases for children’s service are significantly higher
than assumed.
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire. 
These risks will continue to be monitored during 2025-26. 
2.13 RESERVES 
The IJB opening reserves position, subject to completion of the 24/25 audit, is
summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2025 -  2.381 0.780 3.161
Anticipated Drawdown -  (2.381) (0.780) (3.161)
Balance – 31 March 2026 -  - - - 
The £0.780m HSCP earmarked reserve relates to the Service Redesign and Change
Fund which is fully committed in 2025/26. 
Further detail on the reserves is given in Appendix D. 
34

Page 35

2.14 Financial Recovery Plan 
The IJB set a balanced budget for 2025/26 on 20th March 2025. This did not include
any draw on reserves but did include the approval of £4.019m of savings to achieve
financial balance. Services will continue to work towards implementing the recovery
plan to deliver cost reduction targets while carefully managing the level of risk. This
will include the preparation of equality impact assessments. 
The management actions and governance framework outlined below which were
agreed in 2024/25 will continue throughout 2025/26: 
PREVIOUSLY AGREED MANAGEMENT ACTIONS/CONTROLS: 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working.
• Ongoing review of future year savings or transformation programmes to
identify scope for acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund
(ILF) Scotland. 
PREVIOUSLY AGREED GOVERNANCE MEASURES: 
• Establishment a ‘Finance Working Group’, chaired by the IJB Chair or Vice
Chair. The Director and Heads of Service are members of the group. It meets
monthly to facilitate increased oversight and scrutiny of the financial position
and transformation programme as well as detailed budget planning for future
financial years. 
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams, including
line by line reviews of all budget areas.   
PROPOSED ADDITIONAL MANAGEMENT ACTIONS/CONTROLS: 
In addition to these measures further control measures have been agreed for
2025/26 to enhance the scrutiny of the overspend and support the recovery plan. 
35

Page 36

These are:
• Recruitment delay – there will be a recruitment drag with vacancy scrutiny
approved vacancies being held for four weeks before they are advertised to
create more payroll turnover.  This will be for all vacancies except clinical or
registered services vacancies or those which will incur cover costs.
• High-cost care package group – the remit of this group will be expanded to
include care packages for children with a disability and all UNPACs placement
requests.
• Oversight group for looked after and accommodated children in residential
care – this group meets fortnightly to actively review all placements 
PROPOSED RECOVERY ACTIONS AT MONTH 3: 
• The proposed recovery action is outlined in Appendix E.  This includes a mix
of cost reduction targets across various services and a drawdown of all of the
reserves held for Action 15 and the Enhanced Mental Health Outcome
Framework.  The reduces the projected overspend per below: 
TOTAL Health/
NHS AA
Social
Care/NAC
Projected Overspend @ mth3 5.187 2.271 2.916
Financial Recovery Plan Projections (4.012) (1.752) (2.260)
Residual Risk 1.175 0.519 0.656 
• This plan will be reviewed each month and further recovery actions will be
presented to the IJB for approval. 
PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2025-26 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2025-
26. 
4. IMPLICATIONS  
4.1 Financial
36

Page 37

The outturn is an overall year-end overspend of £5.187m (1.5%) prior to recovery
action. The report outlines the main variances for individual services.  The IJB
unearmarked reserve balance is zero. This current position poses a financial risk to
North Ayrshire Council and NHS Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
The ‘financial viability of the HSCP’ risk on our strategic risk register. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2025-26 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout
2025-26. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION 
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
37

Page 38

Caroline Cameron, Director
Author – Eleanor Currie, Chief Finance Officer 
[eleanorcurrie@north-ayrshire.gov.uk] 
38

Page 39

PUBLIC INFORMATION
2025-26 Budget Monitoring Report–Objective Summary as at 30th June 2025                                                                 Appendix A
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 77,621 80,360 2,739 21,100 22,485 1,385 98,721 102,845 4,124
: Locality Services 32,841 33,879 1,038 5,942 6,041 99 38,783 39,920 1,137
: Community Care Service Delivery 40,560 42,184 1,624 0 40,560 42,184 1,624
: Rehabilitation and Reablement 2,118 2,097 (21) 0 2,118 2,097 (21)
: Long Term Conditions 886 928 42 10,625 11,706 1,081 11,511 12,634 1,123
: Community Link Workers 392 387 (5) 0 0 0 392 387 (5)
: Integrated Island Services 824 885 61 4,533 4,738 205 5,357 5,623 266
MENTAL HEALTH SERVICES 35,933 35,419 (514) 78,951 80,405 1,454 114,884 115,824 940
: Learning Disabilities 26,924 26,500 (424) 750 750 0 27,674 27,250 (424)
: Community Mental Health 7,013 6,917 (96) 1,714 1,715 1 8,727 8,632 (95)
: Addictions 1,996 2,002 6 1,941 1,941 0 3,937 3,943 6
: HBCCC 0 0 0 353 0 (353) 353 0 (353)
: Lead Partnership Mental Health NHS Area Wide 0 0 0 74,193 75,999 1,806 74,193 75,999 1,806
CHILDREN & JUSTICE SERVICES 40,026 42,422 2,396 5,755 5,889 134 45,781 48,311 2,530
: Irvine, Kilwinning and Three Towns 3,138 3,188 50 0 0 0 3,138 3,188 50
: Garnock Valley, North Coast and Arran 3,558 3,612 54 0 0 0 3,558 3,612 54
:Intervention Services 1,799 1,808 9 0 0 0 1,799 1,808 9
: Care Experienced Children & Young people 27,094 29,951 2,857 0 0 0 27,094 29,951 2,857
: Head of Service - Children & Families 1,299 751 (548) 0 0 0 1,299 751 (548)
: Justice Services 2,709 2,709 0 0 0 0 2,709 2,709 0
: C&F Health Team 429 403 (26) 4,995 5,116 121 5,424 5,519 95
: Lead Partnership NHS Children's Services 0 0 0 760 773 13 760 773 13
CHIEF SOCIAL WORK OFFICER 1,928 1,723 (205) 0 0 0 1,928 1,723 (205)
PRIMARY CARE 0 0 0 55,147 55,078 (69) 55,147 55,078 (69)
ALLIED HEALTH PROFESSIONALS 0 11,330 11,330 0 11,330 11,330 0
MANAGEMENT AND SUPPORT COSTS 11,059 9,559 (1,500) 3,296 3,681 385 14,355 13,240 (1,115)
OUTTURN ON A MANAGED BASIS 166,567 169,483 2,916 175,579 178,868 3,289 342,146 348,351 6,205
Return Hosted Over/Underspends to East 0 0 0 0 (591) (591) 0 (591) (591)
Return Hosted Over/Underspends to South 0 0 0 0 (517) (517) 0 (517) (517)
Receive Hosted Over/Underspends South 0 0 0 0 50 50 0 50 50
Receive Hosted Over/Underspends East 0 0 0 0 40 40 0 40 40
OUTTURN ON AN IJB BASIS 166,567 169,483 2,916 175,579 177,850 2,271 342,146 347,333 5,187
TOTAL
Partnership Budget - Objective Summary
Council Health
2025/26 Budget
39

Page 40

PUBLIC INFORMATION                               
2025-26 Savings Tracker          Appendix B 
Social Care:   
Ref Description
Deliverability
Status at budget
setting
Deliverability  
June 2025
2025/26
Saving  
Previously Agreed Savings (Full year impact)      
1 Review of Day Care provision Green Green 0.100
2 Service redesign  (CAAST Team and Corporate
Parenting team)
Green Green 0.034  
Adjustments      
3 Payroll Turnover Green Green 0.099  
Mental Health      
4 LD Responder Service Amber Amber 0.150  
Children, Families & Criminal Justice      
5 Brighter Pathways Amber Amber 1.000  
Community Care & Health      
6 Review of Day Care provision Amber Amber 0.107
7 Care at Home Amber Green 0.500  
Cross Service 
8 Care Package Review (all services) Amber Amber 0.200
9 Deletion of vacant posts Green Blue 0.056
10 Increase to charging Green Green 0.186
11 Admin Post Savings Green Blue 0.114
12 Financial Inclusion  Green Blue 0.357 
TOTAL SOCIAL CARE SAVINGS   2.903 
40

Page 41

PUBLIC INFORMATION 
Health:   
Ref Description
Deliverability
Status at
budget
setting
Deliverability  
June 2025 
2025/26
Saving 
Adjustments      
13 Increase recharge to East Ayrshire for beds at
Woodland View
Green Blue 0.010 
14 Payroll Turnover Green Green 0.079 
Other Savings      
15 Admin Savings Amber Blue 0.186 
16 Trindlemoss House - move to social care model Amber Amber 0.250 
17 EICT/Rehab Amber Blue 0.150 
18 Community MH/Wellbeing Review Amber Amber 0.100 
19 Ward 7A - Woodland View Amber Amber 0.341 
TOTAL HEALTH SAVINGS   1.116 
TOTAL NORTH HSCP SAVINGS   4.019 
41

Page 42

PUBLIC INFORMATION
2025-26 Budget Reconciliation               Appendix C 
COUNCIL Period Permanent or
Temporary £'m
Initial Approved Budget 137.739
Adjustments to baseline 0.014
Revised Budget 137.753
Resource Transfer 25/26 1-3 25.462
Additional Funding - 24/25 Adult Social Care RLW 1-3 P 0.073
Additional Funding  RLW 1-3 P 0.126
Additional Funding - Money Smart 1-3 P 0.094
ICT Transfers 1-3 P (0.005)
Additional Funding - Whole Family Wellbeing Funds 1-3 T 0.179
CJSW - S27 1-3 P 3.280
Development of People working in Childrens SW 1-3 P (0.390)
Roundings 3 (0.005)
166.567
HEALTH Period Permanent or
Temporary £'m
Initial Budget exc set aside 161.934
Month 10-12 Adjustments and adjusting for the
full year impact of part years amounts and
temporary funding.
8.532
Revised Budget 170.466
Resource Transfer 24/25 24.640
Resource Transfer 25/26 (25.462)
NORTH NATIONAL INS 25-26 AMBUS 1 0.997
PRESCRIBING 25-26 AMBUSH 1 2.754
PRESCRIBING CRES 25-26 AMBUSH 1 (0.715)
Training Grade Adj - April 1 (0.058)
Training Grade Rates Adj - April 1 0.030
MH: Anticipate PDS Dementia (North) 25/26 1 0.094
MH: Anticipate Delivery of Veteran Specific 25/26 1 0.105
Anticipated RWW from SG 1 0.659
Anticipate 20% Tranche 2 ADP 1 0.174
Training Grade Adj - May 2 (0.013)
Bwp 25-26 East Chest Heart Stroke 2 0.001
Bwp 25-26 East Nest Expansion 2 0.023
Bwp 25-26 East - Sds Advice Service 2 0.013
Bwp 25-26 East Sub Prescribing 2 0.170
25-26 South Budget Paper - North Substitute
Prescribing 2 0.170
25-26 South Budget Paper - Pan Ayrshire Chest
Heart And Stroke 2 0.001
25-26 North Budget Paper - Pan Ayrshire (vision
Support Service 2 (0.005)
25-26 North Budget Paper - Pan Ayrshire
(communitystore) 2 (0.155)
HD52: EARLY INTERVENTION PSYCHOSIS 3 0.100
25-26 Pay Award Increase North 3 1.179
ANTICIPATED BUDGETS INCL HERE (NOT IN LEDGER) 3 0.412
Roundings (0.001)
175.579
TOTAL COMBINED BUDGET 342.146
Social Care Budget Reported at Month 3
Health Budget Reported at Month 3
42

Page 43

PUBLIC INFORMATION
25-26 IJB Reserves Position      Appendix D 
Area of Reserves
Balance
at 31
March
2025
Earmarked Funds £
: Alcohol & Drug Partnership 353           
: Mental Health Action 15 135           
: Primary Care Improvement Fund 46              
: Service Redesign / Challenge Fund 780           
: Family Wellbeing Fund 934           
: Breastfeeding Network 36              
: MH Recovery and Renewal /Enhanced MH
Outcome Framework 365           
: Early Intervention in Psychosis 92              
: LD funding 82              
: Donation (Police Scotland) 1                 
: Primary Care Improvement Fund IP 303           
: GP Premises Improvements - tranches 1 and 2 3                 
: Dental Practice Improvement 29              
: Appropriate Adult 2                 
Total Earmarked 3,161       
43

Page 44

PUBLIC INFORMATION
Financial Recovery Action Plan          Appendix E 
a) Care home placements (60) This will bring the overall budget for
placements and charging order income online. 
b) Physical Disability Services (res,
community and DPs)
(575) Some PD residential packages  £575K  will
move to the older people Care Home
placements budget.  When they transfer, the
older people placements will need to manage 
this transfer within the existing budget.
c) Specialist Rehab wards (75) Based on planned action developed by the
senior manager.
d) Wards 1 and 2 (275) Based on planned action developed by the
senior manager.
e) Care at Home (300) Reflects the potential reduction to costs as an
impact of the SG investment in unscheduled
care
TOTAL (1,285)
a) Learning Disabilities 0
b) Community Mental Health services 0
c) Lead Partnership for Mental Health :
- Adult Inpatients (150) Inpatient Review being undertaken
- Elderly Inpatients (50) Inpatient Review being undertaken 
-  Psychiatry (150) Junior doctor rota still to be revised.
- Action 15 Reserves (486) Draw down of the full pan Ayrshire reserve -
agreed with the CFOs at East and South 
- Enhanced MH Outcome Framework
Reserves
(624) Draw down of the full pan Ayrshire reserve -
agreed with the CFOs at East and South
NORTH AYRSHIRE ELEMENT  38.65% (564)
TOTAL (564)
Health and Community Care Services
Mental Health Services
No cost reduction proposed but the service
need to maintain the current position.  All new
placements need to be offset by discharges or
reductions from care package reviews.
44

Page 45

PUBLIC INFORMATION 
SERVICE AREA
Cost
reduction
target Comment
Children and Justice Services
a) Residential Placements (1,000) Based on some placements moving to
tenancies and other placements moving from
external to in-house provision.
TOTAL (1,000)
ALLIED HEALTH PROFESSIONALS 0.000 No cost reduction proposed but the service
need to maintain the current position.
CHIEF SOCIAL WORK OFFICER 0.000 No cost reduction proposed but the service
need to maintain the current position. 
MANAGEMENT AND SUPPORT
a) Payroll turnover (200) Increase to the current projection based on
dragging vacancies for 4 weeks after vacancy
scrutiny approval.
b) Transition slippage (100) Based on historic slippage.
c) Contractual inflation (25)
TOTAL (325)
OTHER AREAS
b) Agenda for Change - assume fully
funded
(838) Based on 100% cost of the half hour reduction
in working week being funded.
(838)
TOTAL RECOVERY ACTION (4,012)
Remaining projected overspend 1,175
45

Page 46

PUBLIC INFORMATION
Bank and Agency Costs to Month 3      Appendix F 
1) NHS
4863
(Registered)
4864
(Unregistered) TOTAL
AAC074 NORTH CORE SLT ADULT 2,243                 2,243                    
AAC403 WARD 1 WOODLANDS VIEW 9,685             75,132               84,817                  
AAC406 WARD 2 WOODLANDS VIEW 9,022             126,262             135,284                
AAC410 ACH REDBURN REHAB WARD NRS 10,059           46,963               57,022                  
AAC412 ACH DOUGLAS GRANT REHAB WD NRS 5,673             10,014               15,687                  
AAD401 WARD 3 WOODLANDS VIEW NURSING 3,234             137,568             140,802                
AAD402 WARD 4 WOODLANDS VIEW NURSING 682                10,902               11,584                  
AAH047 NEW CLONBEITH NURSING(JURA) 36,558           26,708               63,266                  
AAH415 WVIEW THE GLEN ECT 1,311             627                    1,938                    
AAH417 WVIEW WARD 10 ACUTE MH NRS 1,342             40,645               41,987                  
AAH423 WVIEW WARD 8 ACUTE MH NRS 4,896             256,513             261,409                
AAH460 WARD 5 WOODLANDS VIEW 358                3,075                     3,433                    
AAH466 WVIEW WARD 7B REHAB MH NRS 2,302             2,302                    
AAH492 NEW DUNURE NURSING(CLONBEITH) 11,907           42,643               54,550                  
AAH494 MH BED MANAGEMENT 4,792             4,792                    
AAT001 TRINDLEMOSS 19,288           54,297               73,585                  
AAW047 ARRAN HOSPITAL NURSING 18,134           12,265               30,399                  
ACA412 CAMHS UNSCHEDULED CARE 377                377                       
ACF001 EARLY YRS-C/F TEAM 1 300                300                       
ACN012 PACKAGE OF CARE (P) - AMG 35,869               35,869                  
ACN047 ARRAN DN 11,599           11,599                  
ACP002 NC POC TEAM 2 287                    287                       
ACP003 NC POC TEAM 3 2,389                 2,389                    
ADN033 IRVINE DN 101-                101-                       
ADN042 NORTH WEST COAST DN 10,003           10,003                  
ADN075 GARNOCK VALLEY DN 9,705             9,705                    
ADN080 NORTH DN TEAM LEADERS 22,209           22,209                  
ALA047 LADY MARGARET NURSING 4,839             2,529                 7,368                    
AML146 LD HEALTH CHECKS 12,238           12,238                  
AML392 NORTH CLDT 5,777             164                    5,941                    
AML402 LDS MANAGEMENT 2,286             2,286                    
AML442 North Partnership Management 8,268             8,268                    
AMN412 CMHT NURSING-NORTH AYRSHIRE 1,229                 1,229                    
AMN415 WVIEW WARD 7C FORENSIC REHAB N 358                25,982               26,340                  
AMN419 DAY ACTIVITIES TEAM 10,208              10,208                  
AMN425 INTENSIVE COMMUNITY NURSING TEAM 11,180           11,180                  
AMN431 ADULT MENTAL HEALTH LIASION TEAM 1,798                 1,798                    
AMN446 WVIEW WARD 6 LOW SECURE NRS 12,933              37,194               50,127                  
AMN454 WARRIX AVE 18,214              19,161               37,375                  
ANU632 ICFN - COMMUNITY PHLEBOTOMY 3,303                 3,303                    
AWV438 WVIEW WARD 7A LD A+T NRS 20,658              320,728             341,386                
AXC407 WVIEW WARD 9 ACUTE MH NRS 6,480                 93,989               100,469                
AXC418 WVIEW WARD 11 ACUTE MH NRS 6,589                 43,722               50,311                  
315,161         1,432,403          1,747,564     
2) AGENCY COSTS
Cost Centre Description
Actual
Expenditure
Montrose House Brodick 128,839
Ld Acm 13,864
Mh Acm 13,606
156,309.00
Bank
46

Page 47

Integration Joint Board
21st August 2025
Subject : Montrose House Care Home - Arran 
Purpose : As a follow up to the report presented to the IJB in June 2025,
present the outcome of the recent options appraisal for Montrose
House, share engagement feedback from over the summer
period and to outline the recommended option to IJB to provide a
sustainable model for residential and nursing care that supports
older people living on the island of Arran within the available
financial resource. 
Recommendation : The IJB is asked to approve the following recommendations: - 
(i) Approve the outcome of the Montrose House options
appraisal and the recommended option for future
delivery in Montrose House of 10 permanent beds and
1 respite bed
(ii) Approve the recommended model of day care delivery
for older people on the island of Arran 
(iii) Support the principle of and development of an
admissions Policy for Montrose House to prioritise care
for the residents of Arran and provide a robust
admissions criteria
(iv) Note the further work undertaken over the summer
period to engage and seek feedback on the proposed
changes, the outputs of this engagement are shared
within the report and options appraisal.
(v) Agree to declare the remainder of the Montrose House
building as surplus to North Ayrshire Council and work
with NAC colleagues to identify alternative uses which
complement the care home facility. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
HSCP Health and Social Care Partnership
IJB Integration Joint Board
NHS AA NHS Ayrshire and Arran
SSSC Scottish Social Service Council
Agenda Item 6
47

Page 48

GP General Practitioner
NAC North Ayrshire Council 
1. EXECUTIVE SUMMARY
1.1 The Integration Joint Board were presented with a report in June 2025 containing
recommendations for the future provision of nursing care services within Montrose House
on Arran.  At that meeting the Head of Service advised that since the papers were issued
there was contact regarding the proposal, questions regarding the options appraisal,
consultation, engagement and impact assessment including consideration for Islands
impact.  Officers would undertake further work on those aspects and a proposal brought
back to the IJB in August 2025 for consideration. 
On that basis the IJB agreed to - note (a) a further report would be brought to the IJB in
August 2025; and (b) note the required pause on new admissions to Montrose House whilst
teams reconfigure service delivery in line with the new model of care.
1.2 Montrose House, Arran formally opened in June 2015. The facility is a registered nursing
and residential care home with the building having capacity for up to 30 residents.  It aims
to support people over the age of 65 years, who are unable to live independently at home
due to complex health conditions and age-related frailty.
1.3 Workforce pressures, due to ongoing recruitment challenges on the island over many
years, have resulted in the reduction of bed spaces to ensure safe staffing levels.  In
December 2023 capacity was reduced from 20 to 15 permanent beds.  Montrose House
currently has 12 permanent residents with one additional respite bed.
1.4 In 2024/2025, Montrose House ended the year in an overspend position totalling £0.465m.
This is a deteriorating financial position from previous years as illustrated in the table below. 
The overspend is entirely as a result of staffing costs and in particular agency costs to
ensure safe staffing levels in the care home.  
2022/23 2023/24 2024/25
Total Overspend £0.371m £0.395m £0.465m 
1.5 This report seeks the support of IJB members to adopt and implement a revised service
delivery model, with the full Options Appraisal included as Appendix 1. This would see
permanent bed numbers in Montrose House reduce from 15 to 10, while protecting existing
respite provision (one bed) and re-introducing a flexible day care provision. The model
would operate within the existing contracted staffing establishment, with a focus on
reducing agency dependency and improving service sustainability. This option also aligns
with the broader strategic aim of enhancing community-based care and supporting carers
through increased respite availability and day care opportunities.   The paper also seeks
support to implement an admissions policy to prioritise access for Arran residents with
48

Page 49

close familial and community ties on the isle of Arran.  This policy will be developed taking
cognisance of legal advice from North Ayrshire Council. 
The flexible day care provision would comprise an outreach model for day services on
Arran, removing onsite day care provision with the permanent closure of the Stronach Day
Service building – noting however that the space will continue to be utilised to provide
appropriate opportunities for use to facilitate community activities for both Montrose House
and day service users. 
There are two drivers for the requirement for this change, financial and quality of care.   The
average cost of a placement in Montrose House for 2024/25 was £107,982 per annum in
comparison with the average cost of a placement in a mainland care home at £30,579 per
annum. 
Further, the over-reliance on agency staffing is unsustainable from both a financial and
quality of care perspective.  Not only is this the most expensive approach to securing staff,
but it is also not considered safe nor sustainable to continue to bring up staffing levels in
the care home through ongoing reliance on agency staff.
1.6 These proposed changes do not affect current residents of Montrose House, unless their
needs change significantly and it is no longer safe for them to remain in Montrose House,
or should it be their preference to leave Montrose House.
1.7 Previous ambitions for the Montrose House site, developed as part of the Arran Initial
Agreement for Caring for Ayrshire are now on hold, due to the lack of Scottish Government
capital funding and it is unclear where Arran will sit in relative priority to other projects in
the future when funding becomes available.   It is therefore recommended that together
with North Ayrshire Council that the HSCP develop options to maximise the use of the
remainder of the Montrose House building and that the remainder of the building is
declared as surplus to requirements.
1.8 Given the location and relative isolation of Arran there is a need to sustain an Older
People’s care home on the Island to meet the local population need, however this requires
to be at a lower number of beds to support sustainability from a workforce and a financial
perspective and requires to be protected for access for Arran residents with ongoing Island
connections. 
1.9 Extensive engagement feedback has been undertaken over the summer period and is
included in detail in the options appraisal and engagement report.  There is strong
opposition to the reduction in bed compliment from residents, families and the wider
community with 97% of respondents being unsupportive of the proposed changes with
many citing concerns in relation to emotional distress for families and residents, mainland
relocation and challenges with travel including ferries, the missed opportunity of a large
purpose built facility, distrust of the motivations for change, the demographic and demand
challenges on Arran and the pressures on other health and care services.    
49

Page 50

1.10 Whilst hearing this feedback and being committed to continue to engage with the local
community to sustain and maintain a quality care home provision on Arran, the
recommendation from Officers remains unchanged. 
The quality and continuity of care and maintaining the provision of safe staffing levels for
residents are the key priorities for the ongoing provision of registered residential and
nursing care services at Montrose House.  The HSCP has demonstrated over a period of
time the significant efforts to attempt to secure high quality care and to mitigate and present
solutions to the acute workforce challenges.  Despite these efforts, interventions and
investment there remain significant workforce challenges and a fragile situation in
managing safe staffing levels at Montrose House.   It is not acceptable or tolerable for the
Health and Social Care Partnership to compromise either resident or staff safety and the
proposals recommended mitigate the current risks from the 30% vacancy rate and ongoing
use of agency and bank staff. 
It remains the duty of all public organisations to deliver care safely, meeting Care
Inspectorate requirements, whilst utilising public funds in an efficient manner. The HSCP
recognises that care in Montrose House will continue to be more expensive than the
alternative cost of mainland care home placement, being 3.5 times more per individual in
comparison. However, there continues to be a commitment to delivering a local care home
service from Montrose House and the further development of integrated island services
from the building if safe staffing levels can be secured and maintained.   
The Health and Care (Staffing) (Scotland) Act 2019, places legal duties on care home
providers to ensure sufficient staffing levels and appropriate staff training – those legal
requirements are required to be considered when Local Authorities and Integration
Authorities plan and commission services.  
2. BACKGROUND 
2.1 Montrose House formally opened on 22 June 2015. The purpose build unit cost £5.6m and
has capacity for up to 30 beds, to support adults over the age of 65 years. The development
was in response to recognition to the challenges of 1) Arran residents having to move off
the island for residential care to best meet their needs, and 2) the resulting additional stress
to families and carers still living on the island.
2.2 The building also housed Stronach Day Service, which again opened in June 2015.  This
provided traditional building-based day care opportunities to older people on Arran from
Monday to Friday.  However, the Day Service has been closed since early 2020, as a result
of the COVID pandemic.   
A recent review of day services provision resulted in a pilot outreach model which ran from
May 2023 to March 2024.  The pilot was conducted in two phases and in two localities on
the island. It served a small number of service users and received positive feedback for its
social benefits and respite for carers. However, it relied on existing staff (there are currently
50

Page 51

no staff employed within the day service).  This made it unsustainable due to the current
and ongoing workforce challenges. 
It is therefore recommended to fully adopt an outreach model for day services on Arran,
removing onsite day care. However, the service should only be provided when staffing
allows thus addressing recruitment and resource challenges. A phased implementation
should aim to serve up to six users by the end of 2025, noting however this will be entirely
staffing dependent. It is suggested that a short life working group is established to develop
detailed plans and oversee the phased implementation of this. 
2.3 Montrose House is supported by a workforce comprising of North Ayrshire Council
employed staff including a Unit Manager, Senior Social Care Workers, Social Care
Workers and Care Assistants. All of the care staff require to be registered with the Scottish
Social Services Council (SSSC) and require to have nationally recognised social care
qualifications.  The table below summaries the staffing position: 
Title Numbers in
post (WTE)
Vacancies
(WTE)
Senior Social Care Worker 5 1
Social Care Worker 7.3 4.5
Care Assistant 1 3 
Montrose House is also supported by a wider workforce comprising of business support,
cleaning, catering and gardening staff.  All staff groups have been significantly impacted
by recruitment challenges. Contingencies are in place to support catering during
recruitment challenges arise. (eg. utilising private catering companies, agency staff and
support from the local hospital and high school), to ensure appropriate meal provision at
all times.  This, however, also results in higher costs.  
2.4 The local Community Nursing service and Allied Health professionals, along with GPs from
the local practice, coordinate care and support with the care staff in Montrose House. This
provides a high level of multidisciplinary care to all residents. Team members within Arran
Services have the benefit of working closely together on a daily basis resulting in a highly
responsive and cohesive team.
2.5 Since 2021/22 there have been 28 discharges from Montrose House, with 3 discharges in
2022/23, 11 in 2023/2024, 3 in 2024/2025 and 2 so far, this financial year.  Discharges
include those whose care needs change and can no longer be met in Montrose House. 
The Montrose Care Home team offer care and compassion to residents at the end of their
lives as well as comfort and support to families.
2.6 Since 2020/2021 there have been 29 admissions to Montrose House, however due to a
number of factors including the integrated island support available to people in their own
homes, and the impact of the COVID pandemic, this rate of admission has slowed in recent
years.  
51

Page 52

Year Admissions
2020/21 8
2021/22 12
2022/23 0
2023/24 6
2024/25 2
2025/26 YTD 0 
2.8 The peak in admissions in 2021/2022 reflects the closure of the Cooriedoon Care Home,
Whiting Bay.  Accommodating displaced residents increased bed usage in Montrose
House to 24 beds at that time and resulted in the need secure additional staff.  As a result,
the Partnership employed high levels of agency staff as well as sourcing personnel from
mainland teams and the nurse bank to ensure safe staffing levels. Most of the additional
staff had to travel to the island to work.  The instability of travel to and from the island
however, meant there was a lack of continuity of care, and this was not a sustainable
solution going forward.
2.9 Due to a high number of older people moving to the island to retire, there are also Arran
residents who, at the time of their social work assessment for their suitability for a care
home placement, choose to move off the island to be closer to their family, who do not
reside on the Isle of Arran. This supports families to visit regularly, and familial bonds
remain strong.  It can also be the case that service users' needs can be best supported in
a mainland care home setting due to particular care requirements. 
There are currently 25 residents of Arran who entered into long term settings care across
financial years 2000/2021 to 2025/2026. 
• 16% (4 residents) chose to move into Montrose House, remaining on the island
• 24% (6 residents) opted for mainland care home to be close to family
• 12% (3 residents) required care that could not be provided locally
• 48% (12 residents) required to move to a mainland care setting due to availability
on Arran 
This data highlights the long-term issues with staffing and capacity within Montrose House.
52

Page 53

2.10 Due to increased workforce challenges, there was a further reduction to 15 beds in
December 2023 to ensure safe care provision. The ongoing use of agency staff has not
always allowed for continuity of care and the development of staff/resident familiarity and
close working relationships to flourish.
2.11 The HSCP currently funds 816 care home placements for adults aged over 65, both within
and outwith North Ayrshire. Of these, 74% are accommodated in care homes within North
Ayrshire, while 26% (210 individuals) are placed outwith the local authority area. 
Montrose House currently accounts for 1.6% of the total service users funded for care
home placements. 
3 CURRENT SITUATION
3.1 Montrose House is registered with the Care Inspectorate and subject to planned and
unannounced inspections.  Montrose House was initially registered only to provide
residential level care, however in 2022 following the closure of the only registered nursing
home on Arran, registration for Montrose House was updated to both nursing and
residential level care. 
Montrose House has a close working relationship with the local community nursing team
who provide nursing care to residents and also support the Montrose House team with
governance structures and audit activity. There has been an ongoing improvement
programme in Montrose House since 2023 to ensure that the quality of staffing and care
provision is improved. 
Montrose House,
16%
Mainland (no
capacity), 48%
Mainland (care need
unmet), 12%
Mainland (closer to
family), 24%
Long-term Care Placement for Arran Residents (2020/21 -
2025/2026
53

Page 54

3.2 The latest inspection report for Montrose House Care Home, conducted on 29th October
2024, highlighted a number of positive developments and improvements. The inspection
concluded that the service had made substantial progress since the previous inspection,
positively impacting residents' experiences and outcomes. The service received a "Good"
rating for both supporting residents' wellbeing and for leadership. It was recognised that
effective methods for staffing assessment and planning had been implemented, ensuring
safe and sufficient staffing levels. The introduction of robust quality assurance processes
were recognised as having led to continuous service improvement, with key tasks
delegated to capable staff members.  The inspection also recognised that the employment
of an activity coordinator had significantly enriched residents' daily lives, and that Montrose
House had improved its cleanliness and infection prevention measures.
3.3 Since opening in 2015, due to health and social care staffing challenges on the island, only
20 beds could be safely staffed on an ongoing basis with the exception, as described in
section 2.5, when 24 beds were utilised for a short period of time in mid-2022.  This has
meant that a 10 bedded wing in the care home has never been fully utilised, and any
additional beds brought in to use, required agency staff. 
3.4 Recruitment is an ongoing issue on Arran.  This is likely the symptom of a significantly
ageing population on the island and the lower number of those who are working age. 
The Partnership has dedicated significant time, effort and resources into attempting to
secure the necessary permanent workforce, in a continuing effort to avoid reliance on
agency and bank staff.  Measures include: 
• Glenartney Hotel, Brodick:  This is a 13-bedroomed building, purchased in
February 2023, to encourage individuals who lived off-island to secure posts on
Arran and provide them with accommodation while on the island.  This measure
recognises the difficulties of relying on ferries and sailings, which make it unviable
to commute to Arran on a daily basis. The facility has high occupancy at all times
and is utilised by nursing, medical and social care staff.
• Recruitment & Retention Premium: In October 2022, due to ongoing chronic
recruitment challenges (Band 5 staff), a successful bid to STAC secured a
recruitment and retention premium of 15%. This will remain in place until 30
September 2027.
• Recruitment Videos:  Recruitment videos of staff in teams with chronic vacancies
were prepared and issued with job adverts.  The goal was to not only showcasing
the benefits of an Arran lifestyle, but to also allow potential applicants to glimpse the
work environment team dynamic and improve engage with job adverts - videos often
help capture more attention than text-only listings and reach a broader audience. 
• Appointed a Recruitment Agency:  In December 2023, funding was approved to
appoint the recruitment agency ‘Big Blue Dog’.  Funding was secured for a 20-week
recruitment campaign, launched in January 2024, supported by social media, and
two-weekly catch-up review meetings.  As a result, some posts received multiple
views which converted into applications. 
54

Page 55

• Social Media: A dedicated Facebook page was developed and HSCP vacancies
on Arran are uploaded with links to access job applications.
• Relocation costs: These are provided to staff on lower grades/bands moving to the
island.
• NES Recruitment & Retention Stakeholder Group: The Senior Manager, Arran
Services was selected to be a member of this group due to the innovative
recruitment practice and campaigns that had been delivered on Arran. This
stakeholder group was developed by the National Centre for Remote and Rural
Health and Care in order to work collaborative at a national level to address ongoing
recruitment challenges. 
• Recruitment Events: The Partnership hold regular events on the mainland for all
NAC posts, and these are advertised via leaflets, royal mail, West FM, newsletters,
Facebook and at PPE drop off points.  Staff at these events assist potential
candidates, discussing role profiles. Information sessions for ‘Arran’ vacancies were
held both on the mainland and on Arran.  
• Staff Development: The Partnership have introduced a suite staff training
initiatives, including bespoke courses tailored to individual roles and departmental
needs. We have also supported employees pursue further education and
professional qualifications, ensuring staff are equipped with both practical skills and
strategic thinking capabilities. Our commitment serves not only to enhance
performance but also plays a key role in staff retention, creating a culture where
individuals feel valued and invested in. By fostering continuous learning, we aim to
position ourselves as an attractive employer and build a workforce ready to meet
evolving challenges. 
Despite best efforts, new appointments have been offset by staff leaving the Partnership’s
employment.  The summary below provides an overview of recruitment activity over the
last few years. 
• Montrose House Recruitment - Between January 2023 to August 2025, 65 posts
were advertised for positions in Montrose House, one in five of these had to be
readvertised due to lack of interest.  These 65 posts resulted in 178 applications
received (average of 2.7 per post).  Only around a third of posts advertised (35%)
where successfully filled (23 posts).   
• Care at Home : Since 2023, 37 care at home assistant posts have been advertised. 
This resulted in 22 applications being received and three new staff members being
recruited.   
• Social Work: Between August 2022 and August 2025, 12 adverts for 10 posts were
issued (two posts required readvertisement).  All posts were recruited successfully. 
There is no information on the number of applications received.  
3.5 Staff vacancies in Montrose House currently sit at over 30% and recruitment is further
impacted by the lower numbers of available working population on the island. The
management team on Arran have undertaken a range of activities and initiatives in an
ongoing basis to both promote the roles required on Arran, and to recruit to vacancies with
minimal success.  
55

Page 56

3.6 The continued use of agency staff has created a recurrent total budget overspend, which
is growing year on year as detailed below alongside sustained high levels of high agency
usage: 
Year 2022/23 2023/24 2024/25
Overspend £0.371m £0.395m  £0.465m
Agency Costs £0.411m £0.761m £0.620m 
Residents within Montrose House are subject to the HSCP’s charging policy and this
income remains within the unit budget to partly offset running costs.  The residential care
charges for Montrose House are included in the HSCP Social Care Charging Policy - Social
Care Charging Policy - Non-residential and residential care services.
3.7 Considerable work was undertaken to create an Integrated Island Initial Agreement to
support the whole system health and social care approach and NHS AA vision of Caring
for Ayrshire. This included the redevelopment of the Montrose House to include a new
Health site. These plans are now on hold, due to the lack of Scottish Government capital
funding, and it is unclear where Arran will sit in relative priority to other projects in the future
when funding becomes available.   
Recent discussions have taken place with North Ayrshire Housing and PMI colleagues to
consider any opportunities to utilise the remaining space within Montrose House, with a
view to identifying a proposal which would complement the residential care home.  The
agreement of the final configuration and number of beds in Montrose House will allow for
the HSCP to formally declare the remainder of the building as surplus to requirements and
for the Council to work proactively with the HSCP to identify alternative ways to maximise
the use of the building. 
3.8 Assessments for admissions to Care Home’s in North Ayrshire are considered as part of a
holistic social work assessment and there is a requirement for a comprehensive care needs
assessment to determine eligibility.  The Health and Social Care Partnership will contribute
towards the personal care element of care home fees for those who have been considered
to be eligible, and the Health and Community Care team has a Resource Funding Group
which manages requests and approvals for this process. 
There is currently no specific criteria or policy for accessing Montrose House out with the
agreed admissions eligibility criteria.
3.9 To ensure ongoing safe staffing levels and high-quality care provision which leads to good
outcomes for the residents of Montrose House there has required to be consideration of
the future model of service delivery.  As such an options appraisal has been undertaken
with the outcome presented to the IJB Finance Working Group in June 2025 and
recommendations presented to the IJB in June 2025. 
56

Page 57

4 ASSESSMENT
4.1 The health and social care teams on Arran have worked hard over the last few years as
an integrated team, including the development of a multidisciplinary frailty group to
strengthen community support available to people so they remain at home for as long as
possible. The Multidisciplinary Frailty team on the island meets fortnightly and any
discipline can refer into the group. It is led by the GP and a team comprising community
nursing, physiotherapy, occupational therapy, social work and social care teams and third
sector colleagues. 
4.2 Recent analysis considered as part of the options appraisal has highlighted the following: 
• Residents of Montrose House have an average length of stay of 2.5 years,
compared to the Scottish national average of 1.8 to 2.7 years 
• The average cost of a placement in Montrose House is £107,982 per annum in
comparison with the average cost of a placement in a mainland care home at
£30,579 per annum. 
• Over 200 hours of agency staffing is utilised on a weekly basis by Montrose House
to ensure safe staffing levels. 
• A review of registered care homes for older people on other Scottish islands
highlights similar comparable reduced bed availability.  For example, Islay
(population 3,500) has access to a Local Authority operated 16 bed care home
which is attached to the local community hospital.  There is no registered residential
care home on the island of Mull (3,063). Arran’s closest largest island is Bute, which
has a Local Authority operated care home that currently provides 9 beds for a
population of 6,498. This proposal for Arran, presents a complement of 10 beds and
1 respite bed for a population of 4,629. 
• From a North Ayrshire context, the island of Cumbrae (population 1,376) does not
have a care home for older people.  There is an independent registered care home
on the island of Cumbrae, Millport Care Centre, operated by Sanctuary Care, which
provides care for adults who have a learning disability. 
• The Locality Social Work Team on Arran have a caseload of 260 older people who
are known to the team, with 112 older people currently allocated to Social Work staff
for support. 
• There are 160 older people living on Arran who have access to Community Alarm
and Telecare services. 
• There are currently 55 older people living on Arran who have access to Care at
Home support via the Partnership’s inhouse care at home team with a smaller
57

Page 58

number of people receiving support via self-directed support options 1 and 2.  There
are 13 older people on the waiting list for Care at Home on the island. 
• Information from the SSSC Scottish Social Services Workforce Data Report (on
2023 workforce) details that Scotland’s care workforce has grown to the highest
levels since records began in 2008, with the care workforce making up
approximately 8.1% of all Scottish employment.  The report details that the rise in
workforce was mainly due to increases in staff working in community-based settings
within housing support, care at home and nurse agency. 
• Recruitment and retention challenges for health and care services on Arran have
been experienced over an extended period – vacancy levels across both Montrose
House (over 30%) and wider Partnership teams remain difficult to recruit to. 
• The Partnership has implemented a suite of measures to support recruitment, and
whilst these are necessary to maximise the recruitment potential, they have not led
to a reduced reliance on mainland support. 
Given the location and relative isolation of Arran there is a need to sustain an Older
People’s care home on the Island to meet the local population need, however this requires
to be at a lower number of beds to support sustainability from a workforce and a financial
perspective and requires to be protected for access for Arran residents with ongoing Island
connections. 
5. PROPOSALS
5.1 This paper seeks the support of IJB members to implement a model of care delivery as per
the outcome of the recent options appraisal that Montrose House will reduce, over time, its
bed capacity to 10 permanent beds and 1 respite bed to ensure that the service operates
within the financial resource available and to ensure continued provision of safe care.  IJB
as such is asked to endorse the following recommendations: 
(i) Approve the outcome of the Montrose House options appraisal and the
recommended option for future delivery in Montrose House of 10 permanent
beds and 1 respite bed
(ii) Approve the recommended model of day care delivery for older people on the
island of Arran 
(iii) Support the principle of and development of an admissions Policy for Montrose
House to prioritise care for the residents of Arran and provide a robust
admissions criteria
(iv) Note the further work undertaken over the summer period to engage and seek
feedback on the proposed changes, the outputs of this engagement are shared
within the report and options appraisal.
(v) Agree to declare the remainder of the Montrose House building as surplus to
North Ayrshire Council and work with NAC colleagues to identify alternative
uses which complement the care home facility. 
58

Page 59

5.2 This proposed change does not affect current residents of Montrose House, however, will
have an impact on potential future residents and day services users.
5.3 Anticipated Outcomes 
The HSCP is seeking to ensure individuals who have familial and community ties on the
isle of Arran can have access to residential and nursing care on the island where possible.
This should over time reduce the number of individuals with strong island ties having to
move to care homes off island. 
The HSCP is seeking to ensure that there is a sustainable model of care on Arran and safe
staffing levels to deliver the highest quality of care to residents of Montrose House.
5.4 Measuring Impact 
The following measurables will be put in place:
• Reduction in bed numbers,
• Number of residents in care home places moving back to the island, and
• Financial balance. 
6. IMPLICATIONS 
6.1 Financial 
Since 2022/2023 Montrose House has continued to have a budget overspend as described
at section 1.3.  This proposal will seek to address the overspend with a significant reduction
in agency costs.  Following implementation of the new model, financial modelling will be
undertaken as part of the 2026/27 budget setting process with any recurring savings at that
time being part of the budget moving forward. 
If the IJB were to not support the revised model, there would be a recurring budget pressure
of circa £0.5m per year moving forward given the ongoing and increasing reliance on
agency staff and this would require to be funded through reductions in other services to
mitigate a recurring overspend. 
6.2 Human Resources
There are no direct impacts on the current Montrose House workforce from the proposal. 
There will be a reduction in Agency Staff requirements moving forward, with an overall
reduction in staffing levels required. 
The Health and Care (Staffing) (Scotland) Act 2019, places legal duties on care home
providers to ensure sufficient staffing levels and appropriate staff training – those legal
requirements are required to be considered when Local Authorities and Integration
Authorities plan and commission services.    
59

Page 60

6.3 Legal
Legal advice has been sought on the admissions policy, to ensure no discrimination. 
The Health and Care (Staffing) (Scotland) Act 2019, places legal duties on care home
providers to ensure sufficient staffing levels and appropriate staff training – those legal
requirements are required to be considered when Local Authorities and Integration
Authorities plan and commission services.  
6.4 Equality/Socio-Economic
Both an Equality and Children’s Rights Impact Assessment and an Island Impact
Assessment have been completed. The full assessments will be made available on the
Council’s website and for ease of access are also included as Appendix 2 to the report. 
The findings are summarised below. 
The Equality Impact Assessment concluded that maintaining the quality and continuity of
care, alongside safe staffing levels, remains the central priority for Montrose House. In
response to the current 30% vacancy rate and reliance on agency staff, the Health and
Social Care Partnership (HSCP) proposes a reduction to 10 permanent beds and 1 respite
bed, alongside the implementation of a hybrid day service model. These changes will be
managed sensitively, with no current residents affected unless their care needs can no
longer be met safely. An admissions policy will also be explored to prioritise individuals
with familial ties to the island. 
While the HSCP acknowledges the strong opposition from the island community and staff,
as well as the distress and financial burden associated with off-island placements, it is
imperative that care is delivered safely, in line with regulatory standards and within
sustainable financial parameters. Montrose House remains a valued part of integrated
island services, and the HSCP is committed to its future, contingent on securing safe
staffing levels. 
The Island Impact Assessment concludes that the proposed changes represent a
necessary response to persistent staffing challenges and financial pressures. The
introduction of a hybrid day service model and the reduction in bed capacity aim to enhance
service sustainability, safety, and quality of care. While the prioritisation of residents with
familial ties and ongoing performance monitoring are positive steps, the potential impact of
off-island placements—including emotional distress and increased travel costs—remains
a significant concern. 
Given the absence of viable alternative delivery models and mitigation mechanisms, the
proposals are considered proportionate and appropriate for the island context. Further
review and community engagement are planned to address any unintended
consequences.
6.5 Risk
There is an amber risk to safe staffing levels due to the variability of agency staffing and a
red risk due to financial overspends.
60

Page 61

6.6 Community Wealth Building 
The recommendation provides a commitment to the future provision of a Care Home
service on the Island. 
6.7 Key Priorities 
This approach continues to support people as close to home as possible. This proposed
change does not affect current residents of Montrose House, who will continue to live there.
7. CONSULTATION
7.1 Consultation sought feedback on the preferred option and accompanying revised
admissions policy from residents, their families, the wider community, staff, professionals,
and partners. 
The full report is included as part of the Options Appraisal in Appendix 1. 
The engagement was seen as key to raising local awareness of the operational challenges
we face in delivering a safe, high-quality service.  Particularly around staffing constraints
on the island, the increased reliance on costly agency provision, and the associated impact
on continuity of care. We also sought to highlight the pressures linked to funding and
emphasised the need for a sustainable delivery model that protects island-based care
while aligning with our strategic aims. 
A number of engagement methods were utilised to ensure that our message was received
as widely as possible, and as many stakeholders as possible were able to engagement
and feedback to us.  Methods include: 
• A public consultation ‘drop-in’ event was held on 22 July 2025, for residents, their
families and the wider community, and was attended by c.120-150 delegates, 
• Survey/questionnaire was offered to community and professional stakeholders in
order for their feedback to be registered (458 & 23 responses respectively)
• Email to all community groups (as notified by Third Sector Partners) 
• Professionals' discussions
• The Integrated Island Team engaged in creating a plan which ensures the
sustainability of Montrose House and its workforce.
• North Ayrshire Council Legal Services and HSCP Finance Teams have been
considered the legal and financial sustainability of the model proposed.
• Four written letters were received from Arran Community Council, Arran Council for
Voluntary Services and two individuals from the local community, these are included
in the engagement report. 
61

Page 62

The consultation period ran from 15 July to 1 August 2025, extended from its original
closing date to encourage greater participation. 
To analyse feedback, two staff members independently coded open-ended responses,
grouping them into categories and identifying overarching themes. Feedback is
summarised below and detailed in full in the accompanying report. 
• Drop In Session: The session was organised as a drop-in event to facilitate informal
discussion and feedback. However, prior conversations within the community led to
the majority of attendees arriving at the scheduled start time, resulting in attendance
numbers exceeding the venue’s capacity. This created a challenging environment
for both attendees and staff. Estimated attendance was between 120–150
individuals.
• Community Survey: 458 responses were received, primarily from Arran residents
(94%), with 90% reporting family connections to the island. Over two-thirds (67.4%)
were aged 55 or older. While only 17.2% currently receive support from local health
and social care services, 97% of non-residents of Montrose House indicated they
would consider or may consider using a care home service on the island in future.
• Staff and Professional Survey: 23 responses were received, with most respondents
living or working on Arran and reporting awareness of recruitment challenges. 61%
did not support the proposed bed reduction, and 65% expressed broader concerns
about staffing, service capacity, and the impact on elderly residents.
• Correspondence: Four letters submitted by community organisations and
individuals reinforced concerns about service reductions, staffing, and the long-term
viability of Montrose House. Suggestions included workforce development
initiatives, funding proposals, and further engagement.
Key Themes Identified Across All Respondents 
• Service Provision: Widespread concern about the reduction in permanent bed
capacity. The change was viewed as insufficient to meet the needs of an ageing
population and as contributing to underutilisation of a purpose-built facility. These
concerns were echoed strongly during the drop-in session.
• Admissions Policy: Broad support for prioritising individuals with familial ties to
Arran, though many preferred criteria based on residency length or assessed need.
Requests were made for clearer definitions and transparent implementation.
• Impact on Residents & Families: Challenges associated with relocation to mainland
care were highlighted, including reduced visitation, emotional distress, and
disruption to community ties. Ferry service reliability was frequently cited. These
concerns were particularly emotive during the drop-in session.
• Workforce Challenges: Recruitment difficulties were widely acknowledged. Barriers
included limited affordable housing, inflexible shift patterns, and geographic
62

Page 63

isolation. Suggestions included revising shift structures, improving pay and
conditions, and increasing visibility of local job opportunities.
• Pressure on Other Services: The proposed reduction in bed capacity was seen as
likely to increase pressure on hospital services, home care provision, and informal
carers. Risks identified included delayed discharges, bed blocking, and crisis-driven
care interventions.
• Day Care & Outreach Services: General interest in the proposed outreach day-care
model, though views were mixed on feasibility and effectiveness. Many emphasised
that day-care services should complement, not replace, residential care.
• Transport: Ferry service reliability was a recurring concern, particularly in relation to
off-island care placements and staff commuting.
• Transparency & Consultation Process: Requests for greater clarity around the
proposals, including access to supporting documents. Some expressed scepticism
about the consultation process and called for further engagement before decisions
are finalised.
• Financial Considerations: Some respondents questioned whether the proposed
changes were financially motivated. Suggestions were made for alternative funding
approaches, including local taxation mechanisms and targeted investment
strategies.
• Community & Economic Impact: Concerns about broader implications for the
island’s economy and community cohesion. Some felt that reductions in care
provision could discourage new residents and affect the sustainability of local
services.
There is a commitment to continue to engage with the local community and workforce as
plans are taken forward and to continue to ensure we can maximise all opportunities to
ensure we can provide a safe and sustainable care home service for the residents of Arran
both now and in the future.
Caroline Cameron
Director
for more information, please contact Kerry Logan, Head of Service, HCC on
[01294 317805] or [klogan@north-ayrshire.gov.uk]
Previous reports:
• IJB June 2025 – Montrose House Arran - Document.ashx
Appendices:
Appendix 1- Montrose House Care Home – Options Appraisal August 2025
Appendix 2 – Equality & Children’s Rights Impact Assessment and Island Communities
Impact Assessment
63

Page 64

North Ayrshire Health & Social
Care Partnership: Montrose
House Care Home
OPTIONS APPRAISAL V2.1
August 2025
64

Page 65

Contents
Introduction .................................................. 1
Engagement & Consultation ....................... 2
Drop-in Session Summary ....................... 3
Community Survey ................................. 3
Staff and Professional Survey .................. 3
Correspondence .................................... 3
Key Themes Identified Across All
Respondents .......................................... 4
Background & Context ................................... 5
Landscape Review ..................................... 5
Strategic Drivers ..................................... 6
Arran Demographics .................................. 6
Care Home Data Analysis ........................... 7
There are currently 25 residents of Arran who
entered into long term settings care across
financial years 20/21 to 25/26. .................... 7
Care Homes – North Ayrshire .................... 12
Care Homes – Island Comparison ............. 14
Workforce ................................................ 15
Recruitment ............................................. 18
Options Appraisal ........................................ 22
Option 1: Do Nothing / Status Quo ............ 22
Quality Impact ...................................... 22
Financial Impact ................................... 23
Workforce Impact ................................. 23
Benefits & Risk ..................................... 23
Option 2: Service Closure ......................... 24
Quality Impact ...................................... 24
Financial Impact ................................... 24
Workforce Impact ................................. 24
Benefits & Risk ..................................... 25
Option 3: Reduce to 10 Permanent Care Beds
................................................................ 25
Quality Impact ...................................... 26
Financial Impact ................................... 26
Workforce Impact ................................. 26
Benefits & Risk ...................................... 26
Option 4: Reduce to 10 Permanent Care Beds
+ 1 Respite Bed + flexible Day Care Model . 27
Quality Impact ...................................... 27
Financial Impact ................................... 27
Workforce Impact ................................. 28
Benefits & Risk ...................................... 28
Recommendation & Conclusion ................... 29
Impact Assessments.................................... 31
Appendix 1: SBAR Day Services May 2024 ..... 32
Appendix 2: Engagement .............................. 34
Montrose House Consultation Report ....... 34
Montrose House Consultation - Residents,
Families and Wider Island Community ... 34
Montrose House Consultation – Staff,
Professionals and Wider Partners .......... 54
Montrose House Consultation – Letter
Summaries ........................................... 66
Appendices .......................................... 68
Letter 1 ................................................. 68
Letter 2 ................................................. 68
Letter 3 ................................................. 69
Letter 4 ................................................. 71
Drop In Event Flyer ................................... 74
Community Drop In Event, Stronach Room,
Montrose House (22 July 25) ..................... 75
Break Out Meeting Notes: ..................... 75
Appendix 3: Big Blue Dog Recruitment Report . 2 
65

Page 66

Version Date Author Description of Change
1.0 19 June
2025
Paul
O’Donnel
Intro, demographics and care home review
1.1 19 June
2025
Trudi
Fitzsimmons
Options Appraisal
2.0 30 June
to 12
August
2025
Trudi
Fitzsimmons
Version control box added.  Introduction added by reorganising
some of the background/context info, engagement and
recruitment section added. Big Blue Dog summary report added to
appendix. Impact assessments summarised.  Engagement report
appended.  Strategic drivers (local) added. Accessibility check
completed.
2.0 30 June
to 12
August
2025
Paul
O’Donnell
Landscape review of care home positions across Scotland
completed. Examination of Arran's population and workforce
demographics. Analysis of Arran residents who have entered long-
term care and the reasons behind their placement choices. Review
of annual care home approvals for residents of Arran. Comparison
of admissions and discharges between Mainland and Arran.
Displacement data analysis. Review of Bank Hours versus Agency
usage across Q1 25/26. Assessment of Montrose House vacancy
hours in relation to agency use and links to the Health and Care
(Staffing) (Scotland) Act.
66

Page 67

1 | P a g e
Introduction
This report provides an overview of service delivery in Montrose House, Arran. The facility, owned by the
Council and managed by the Health and Social Care Partnership (HSCP), opened on 22 June 2015.
Montrose House is a registered nursing and residential care home with a capacity for up to 30
residents. Montrose House supports individuals aged 65 and over who are unable to live independently
due to complex health needs and age-related frailty. It is currently the only care home on the island.
Since opening in 2015, staffing challenges in Health and Social Care on the island have resulted in a
reduction in capacity. The current allocation at Montrose House comprises 12 permanent residents
and one additional respite bed. 
Since 2020/2021, there have been 29 admissions to Montrose House; however, due to several factors,
including the integrated island support available to people in their own homes and the impact of the
COVID pandemic, this rate of admission has slowed with zero admissions in 2022/23, 6 in 2023/2024, 2
in 2024/2025 and no admissions so far, this financial year. 
Montrose House is registered with the Care Inspectorate and is subject to planned and unannounced
inspections. Montrose House was initially registered only to provide residential-level care; however, in 2022,
following the closure of the only registered nursing home on Arran, its registration was updated to
encompass both nursing and residential-level care. 
Montrose House has a close working relationship with the local community nursing team, which
provides nursing care to residents and also supports the Montrose House team with governance
structures and audit activities. An ongoing improvement programme has been in place at Montrose
House since 2023 to enhance the quality of staffing and care provision. The history of the Care
Inspectorate grades is below.
67

Page 68

2 | P a g e
The care home building also housed Stronach Day Service, which also formally opened in June 2015,
offering traditional building-based day care opportunities to older people on Arran, Monday to Friday. 
Stronach Day Service has been closed since the pandemic in early 2020. A recent review led to the
development of a pilot outreach model, which was implemented from May 2023 to March 2024 and
conducted in two phases across two localities on the island. The pilot served a small number of users
and received positive feedback for its social benefits and the respite it provided for carers. However, it
relied on existing staff, making it unsustainable due to the current and ongoing workforce challenges on
the island. There are currently no staff employed within the day service at this time. The SBAR for Day
services is attached as Appendix 1
To ensure the continued provision of care on the island and to develop a sustainable and financially
viable service model, a comprehensive review of the service has been undertaken. This includes an
assessment of the local context, consideration of national policy developments, feedback from service
users and their families, and an options appraisal. The findings of this review are presented in this
report.
Engagement & Consultation
Consultation sought feedback on the preferred option and accompanying revised admissions policy
from residents, their families, the wider community, staff, professionals, and partners.
This process was seen as key to raising local awareness of the operational challenges we face in
delivering a safe, high-quality service.  Particularly around staffing constraints on the island, the
increased reliance on costly agency provision, and the associated impact on continuity of care. We
also sought to highlight the pressures linked to funding and emphasised the need for a sustainable
delivery model that protects island-based care while aligning with our strategic aims. 
68

Page 69

3 | P a g e
A number of engagement methods were utilised to ensure that our message was received as widely as
possible, and as many stakeholders as possible were able to engagement and feedback to us. 
Methods include:
• A public consultation ‘drop-in’ event was held on 22 July 2025, for residents, their families and
the wider community, 
• Survey/questionnaire was offered to community and professional stakeholders in order for their
feedback to be registered (458 & 23 responses respectively 
• Email to all community groups (as notified by Third Sector Partners) 
• Professionals' discussions
• The Integrated Island Team engaged  in creating a plan which ensures the sustainability of
Montrose House and its workforce.
• North Ayrshire Council Legal Services and HSCP Finance Teams have been considered the legal
and financial sustainability of the model proposed.
• Four written letters were received from Arran Community Council, Arran Council for Voluntary
Services and two individuals from the local community.
The consultation period ran from 15 July to 1 August 2025, extended from its original closing date to
encourage greater participation.
To analyse feedback, two staff members independently coded open-ended responses, grouping them into
categories and identifying overarching themes. Feedback from the drop-in session is summarised below
and detailed in Appendix 2: Engagement.
Drop-in Session Summary
The session was organised as a drop-in event to facilitate informal discussion and feedback. However,
prior conversations within the community led to the majority of attendees arriving at the scheduled
start time, resulting in attendance numbers exceeding the venue’s capacity. This created a challenging
environment for both attendees and staff. Estimated attendance was between 120–150 individuals.
Community Survey
458 responses were received, primarily from Arran residents (94%), with 90% reporting family connections
to the island. Over two-thirds (67.4%) were aged 55 or older. While only 17.2% currently receive support
from local health and social care services, 97% of non-residents of Montrose House indicated they would
consider or may consider using a care home service on the island in future.
Staff and Professional Survey
23 responses were received, with most respondents living or working on Arran and reporting awareness of
recruitment challenges. 61% did not support the proposed bed reduction, and 65% expressed broader
concerns about staffing, service capacity, and the impact on elderly residents.
Correspondence
Four letters submitted by community organisations and individuals reinforced concerns about service
reductions, staffing, and the long-term viability of Montrose House. Suggestions included workforce
development initiatives, funding proposals, and further engagement.
69

Page 70

4 | P a g e
Key Themes Identified Across All Respondents
• Bed Capacity and Service Provision: Widespread concern about the reduction in permanent bed
capacity. The change was viewed as insufficient to meet the needs of an ageing population and as
contributing to underutilisation of a purpose-built facility. These concerns were echoed strongly
during the drop-in session.
• Admissions Policy Preferences: Broad support for prioritising individuals with familial ties to Arran,
though many preferred criteria based on residency length or assessed need. Requests were made
for clearer definitions and transparent implementation.
• Impact on Residents and Families: Challenges associated with relocation to mainland care were
highlighted, including reduced visitation, emotional distress, and disruption to community ties.
Ferry service reliability was frequently cited. These concerns were particularly emotive during the
drop-in session.
• Recruitment and Workforce Challenges: Recruitment difficulties were widely acknowledged.
Barriers included limited affordable housing, inflexible shift patterns, and geographic isolation.
Suggestions included revising shift structures, improving pay and conditions, and increasing
visibility of local job opportunities.
• Pressure on Other Services: The proposed reduction in bed capacity was seen as likely to increase
pressure on hospital services, home care provision, and informal carers. Risks identified included
delayed discharges, bed blocking, and crisis-driven care interventions.
• Day-Care and Outreach Services: General interest in the proposed outreach day-care model,
though views were mixed on feasibility and effectiveness. Many emphasised that day-care services
should complement, not replace, residential care.
• Transport and Accessibility: Ferry service reliability was a recurring concern, particularly in relation
to off-island care placements and staff commuting. These issues were raised repeatedly during the
drop-in session.
• Transparency and Consultation Process: Requests for greater clarity around the proposals,
including access to supporting documents. Some expressed scepticism about the consultation
process and called for further engagement before decisions are finalised. The drop-in session
revealed visible distress and frustration over perceived lack of transparency.
• Financial Considerations: Some respondents questioned whether the proposed changes were
financially motivated. Suggestions were made for alternative funding approaches, including local
taxation mechanisms and targeted investment strategies.
• Community and Economic Impact: Concerns about broader implications for the island’s economy
and community cohesion. Some felt that reductions in care provision could discourage new
residents and affect the sustainability of local services.  
70

Page 71

5 | P a g e
Background & Context
The Isle of Arran is located in the Firth of Clyde off the coast of Ayrshire. At 432km2, it is the seventh-
largest Island in Scotland. The challenge of delivering health and social care to Arran's population is
exacerbated by its physical separation from the mainland and the geographically dispersed nature of
its population. The majority of the population resides in Lamlash, Brodick and Whiting Bay. In addition
to Brodick, Lamlash, and Whiting Bay, there are nine smaller settlements with populations ranging from
40 to 250, scattered around the 56-mile radius of the island. The rest of the population lives in single or
small groups of houses between these settlements. 
Landscape Review
This landscape review provides an overview of the care home sector for older people in Scotland based
on the available data from 2024.
As of March 2024, Scotland has approximately 1,020 registered care homes for adults, offering around
40,079 places. This represents an 18% decline in the number of homes and a 6% decrease in capacity
compared to ten years earlier. The sector is mainly operated by the private sector (about 65%), with the
remaining managed by voluntary organisations and local authorities. About 34,113 residents live in
these homes, over 91% of whom are aged 65 or older. Of these, roughly 30,170 are long-stay older
adults, many requiring complex care. Notably, approximately 63% of these residents have a diagnosis
of dementia.
The main trends indicate
• Reduction in capacity: The sector has experienced a gradual contraction due to financial
pressures, changing care models, and closures of smaller homes.
• Occupancy rates: These generally remain stable at around 85%, though there are local
variations depending on home size, location, and regulatory factors.
71

Page 72

6 | P a g e
• Residents in older people’s care homes constitute 91% of all care home residents. Within this
group, the private sector is the main provider, supplying 83% (25,853) of all beds. It is estimated
that Local Authority care homes currently offer 10% (3,222) of the capacity.
The social care workforce in Scotland is considerable and gradually expanding, but staffing shortages
remain a significant challenge. As of December 2023, the paid social services workforce was 212,780,
representing about 8.1% of total employment in Scotland. In full-time equivalent terms, the workforce
was around 161,750.
The growth in 2023 was mainly driven by housing support and care-at-home services, along with nurse
agencies providing care. However, some areas, such as residential childcare and day services,
experienced steadier growth. The largest sub-sectors by workforce size include care at home/housing
support, care homes for adults, and day care for children.
Although growth remained modest, staff turnover and vacancies continue to be significant issues. The
workforce stability index was 74.4% in 2023, and 48% of care services reported vacancies. Certain
types of services, particularly care at home, housing support, and care homes, faced the most
challenging recruitment problems, mainly due to a shortage of suitable, experienced, or qualified
applicants.
Strategic Drivers
The review was carried out in line with the strategic vision of the Partnership and is underpinned our
core values, to treat our service-users with Caring, Empathy, and Respect.
"People who live in North Ayrshire are able to have a safe, healthy and active life."
This vision is delivered by a commitment to five interlinked strategic priorities:
• Enable Communities: Recognising communities as key partners, the HSCP aims to strengthen
local capacity, resilience, and health literacy. Ongoing engagement will ensure services reflect
local needs and aspirations.
• Develop and Support Our Workforce: Addressing current and future workforce challenges is
essential. The HSCP is committed to workforce planning, wellbeing, and ensuring suitable
infrastructure to support service delivery.
• Provide Early and Effective Support: Emphasis is placed on prevention and early intervention
across all services. By acting early, the HSCP seeks to reduce crisis interventions and invest in
sustainable, community-based support.
• Improve Mental and Physical Health and Wellbeing: The HSCP continues to prioritise both
mental and physical health, recognising increasing demand and the importance of maintaining
independence and quality of life through integrated support.
• Tackle Inequalities: With over 40% of residents living in areas of high deprivation, the HSCP is
committed to addressing the root causes of inequality through collaborative, targeted action to
improve long-term outcomes.
Arran Demographics
Population figures are based on the 2024 mid-year estimates from the National Register for Scotland.
Arran has an estimated population of approximately 4,629, with 34.4% of residents aged 65 and older
72

Page 73

7 | P a g e
and 26.8% living with a long-term health condition. In comparison, only 662 residents are under 18. The
working-age group (18-64) comprises 2390 residents. 
Across Scotland, the median age of the adult social care workforce is 46, with 32% aged 55-64 and
22.5% aged 45-54. Local NHS Ayrshire and Arran plans indicate that over 63% of support services staff
are aged 50 or older.   
Key strengths for the Arran population include:
• Higher life expectancy
• Low levels of deprivation
• Low unemployment
• High educational attainment
• Low crime rates
However, the island's needs, in contrast to its strengths, include:
• Falling population
• Geographic Access
• Older Age Profile
• High Dependency Ratio – a small, shrinking working-age population 
Care Home Data Analysis 
There are currently 25 residents of Arran who entered into long term settings care across financial years
20/21 to 25/26.
• 16% (4 residents) chose to move into Montrose House, remaining on the island
• 24% (6 residents) opted for mainland care home to be close to family
• 12% (3 residents) required care that could not be provided locally
• 48% (12 residents) required to move to a mainland care setting due to availability on Arran
The data highlights the long-term issues with staffing and capacity within Montrose House.
73

Page 74

8 | P a g e
The total number of Arran residents approved for care home placements over the last five years has
been volatile (range 13-24), averaging 16 per year. After a dip to 13 in 2023/24, volumes rose again to 21
in 2024/25. Year to date for 2025/26 (April to August) stands at five, which extrapolates to roughly 12 if
the current pace continues. Considering the population demographics on Arran, a planning range
would be between 15 and 20 approvals per year.
74

Page 75

9 | P a g e
The graph below illustrates the admission and discharge data for North Ayrshire mainland compared to
Montrose House. Key highlights of the data include
• For care homes on the mainland, admissions peaked at 379 in 22/23 but declined sharply by
33% in 24/25. By 24/25, discharges have exceeded admissions. 
• Montrose House has fewer than 13 admissions annually, and discharges have been equal to or
greater than admissions over the past three financial years, however it must be noted this is
largely influenced by capacity linked to staffing. 
75

Page 76

10 | P a g e
The care homes on the mainland experienced three consecutive years of net growth, adding a total of
141 residents, before suffering a net loss of 26 in the 2024/25 financial year. In comparison, Montrose
House only gained residents in 21/22; since then, the figures have declined, with a net loss of 9
residents over the last three financial years.
76

Page 77

11 | P a g e
As part of the data analysis, a comparison of displacement data for Arran and Mainland Care Homes
was conducted. The data shows:
• For Arran residents, the average displacement distance was 62 miles. This figure includes three
individuals who chose to move to a cross-border Care Home; when excluding these cases, the
average displacement was 28 miles. The maximum recorded displacement was 510 miles, and
the minimum was 4.3 miles. The average distance from listed next of kin was 96 miles.
• For mainland residents, the average displacement was 13 miles, reducing to 10 miles when
excluding four cross-border arrangements. The maximum displacement was 509 miles, and the
minimum was 0.2 miles. The average distance from next of kin was 41 miles.
77

Page 78

12 | P a g e
Care Homes – North Ayrshire
There are 16 Care Homes within North Ayrshire. Montrose House currently has a vacancy rate of 13.3%,
which is significantly higher than the overall average vacancy rate across care homes in North Ayrshire,
which stands at approximately 6.6%
78

Page 79

13 | P a g e
North Ayrshire Health and Social Care Partnership currently funds 816 placements for adults over 65 in
care homes within and outside North Ayrshire. Montrose House accounts for 1.6% of the total service
users currently funded for care home places. Of these, 606 residents (74%) are accommodated in care
homes based in North Ayrshire, while 210 residents (26%) are placed outside the local authority area. 
79

Page 80

14 | P a g e
Care Homes – Island Comparison
Comparisons with other island services are covered below. We used the following classifications from
the Scottish Government. Islands/island groupings with mid to high population levels, have
populations which are higher than at least 60% of the islands covered in this chapter, but lower than
10% of the islands covered by this chapter. The population of these islands varies significantly. The
islands in this category are:
• Bute (population 6,498)
• Uist & connected isles (population 4,846)
• Arran (population 4,629)
• Islay (population 3,228)
• Mull (population 2,800)
• Great Cumbrae (population 1,376)
• Barra & Vatersay (population 1,264)
• Whalsay (population 1,061)
• Yell (population 966)
• Tiree (population 653)
• Unst (population 632)
• Westray (population 588)
• Seil (population 551)
• Sanday (Orkney) (population 494)
80

Page 81

15 | P a g e
• Hoy & Walls (population 419)
• Bressay (population 368)
A comparison of Care Homes within these areas found that the national average number of bed spaces
available is twelve. 
Workforce
In 2019, the Health and Care (Staffing) (Scotland) Act came into force to ensure that Health and Social
Care services across Scotland have the appropriate staffing levels in place to deliver safe, high-quality
care. The Act places a legal duty on NHS Boards and care providers to:
• Ensure staffing levels are adequate to meet the care requirements of patients and service
users.
• Utilise real-time staffing data and evidence-based tools to guide staffing decisions.
• Take measures to minimise the risks to patient safety and staff wellbeing caused by insufficient
staffing.
• Monitor and report on staffing sufficiency and the effects of decisions.
Montrose House is supported by a workforce comprising North Ayrshire Council-employed staff,
including a Unit Manager, Senior Social Care Workers, Social Care Workers, and Care Assistants. All
care staff require registration with the Scottish Social Services Council (SSSC) and must hold nationally
recognised social care qualifications. The table below summaries the staffing position as of June 2025: 
Title Number in post Vacancies
Senior Social Care Worker 5.0 WTE 1.0 WTE
Social Care Worker 7.3 WTE 4.5 WTE
Care Assistant 1.0 WTE 3.0 WTE
81

Page 82

16 | P a g e
Montrose House is also supported by a wider workforce comprising of business support, cleaning,
catering and gardening staff. All these staff groups have been significantly impacted by recruitment
challenges, and there are also staff vacancies in these areas of the workforce. Several contingencies
have been put in place to support staffing when that team are affected by vacancies, this includes
utilising private catering companies, agency staff and support from the local community hospital and
the high school to ensure appropriate meal provision at all times: however, these all result in higher
costs. 
Staff vacancies in Montrose House currently stand at over 30%. 
Key Findings for April 25 to June 25: Montrose House Staffing Data
Agency staff made up the majority of temporary hours over all three months, reaching a peak of 66% in
May and averaging 606.6 hours of temporary staffing.
Bank staff usage remained low in comparison, with a monthly average of 699 hours versus 1079 agency
hours – a 54% higher agency usage on average.
The total hours requiring cover – including vacancies, sickness, annual leave and training increased by
21.6% from May to June, hitting the quarters highest level.
Vacancy and Cover Demand
Month Vacancy Hours Sickness/AL/Training Total Hours
April 2025 1425.50 624.75 2050.25
May 2025 1281 570.00 1851.00
June 2025 1580.50 671.50 2252.00 
Breakdown of Temporary Staffing Usage
Month Bank Staff (hrs) Agency Staff
(hrs
% Agency of
Temp Staff
April 2025 686.00 1199.25 63.6%
May 2025 582.50 1129.25 66%
June 2025 828.75 909.75 52.3% 
82

Page 83

17 | P a g e
Bank Hours vs Agency Hours 
Bank vs Agency Hours (%) 
83

Page 84

18 | P a g e
Vacancy Hours vs Agency Hours 
Hours requiring cover versus agency and bank hours utilised
Year 2022/23 2023/24 2024/25
Overspend £0.371m £0.395m £0.465m
Agency Costs £0.411m £0.761m £0.620m
Montrose House overspent in 24/25 by £465k.
The current staffing data shows a persistent and unsustainable reliance on agency staff, raising issues
about costs, quality, continuity of care, and compliance with the Health and Care (Staffing)(Scotland)
Act requirements. The legislation emphasises the importance of sustainable workforce planning—
including recruitment, retention, and the effective deployment of staff—as a key duty of care providers.
While sometimes necessary to ensure safe minimum cover, over-reliance on agency staff conflicts
with the long-term strategic aims of the Act.
Recruitment
Recruitment is an ongoing issue on Arran.  This is likely the symptom of a significantly ageing population on
the island and the lower number of those who are working age. 
• Montrose House: Between January 23 to August 25, 65 posts were advertised for positions in
Montrose House, one in five of these had to be readvertised due to lack of interest.  These 65
posts resulted in 178 applications received (average of 2.7 per post).  Only around a third of
posts advertised (35%) where successfully filled (23 posts).   
Table 1: Montrose House Recruitment, Jan 23 to Aug 25 by post and outcome (Source: HSCP Business
Support Team) * This is total number of applications received, inclusive of all readvertisements
Type of
Post Post Title Successful in
filling post? No of  Posts No of Apps* Times
Advertised
84

Page 85

19 | P a g e
Care   38 142 45 
Care Assistant  17 93 19  
No 11 67 14  
Yes 6 26 5 
Social Care Worker 20 44 25  
No 14 24 17  
Yes 6 20 8 
Social Care Worker (Snr) 1 5 1  
Yes 1 5 1
Support   27 36 33 
Activities Co-Ordinator 1 1 1  
Yes 1 1 1 
Catering Supervisor 7 8 9  
No 5 5 7  
Yes 2 3 2 
Cook  6 5 7  
No 4 1 5  
Yes 2 4 2 
Driver/Handyperson 3 11 3  
No 2 6 2  
Yes 1 5 1 
Facilities Assistant  9 10 12  
No 6 3 9  
Yes 3 7 3 
Unit Manager  1 1 1  
Yes 1 1 1
Total   65 178 78
• Care at Home: Since 2023, 37 care at home assistant posts have been advertised.  This
resulted in 22 applications being received and three new staff members being recruited.   
• Social Work: Between August 2022 and August 2025, 12 adverts for 10 posts were issued (two
posts required readvertisement).  All posts were recruited successfully.  There is no information
on the number of applications received.  
Understaffed care provision poses significant risks to both the quality of care and the wellbeing of staff and
service users.  Inadequate staffing levels mean that people receiving care could experience delays in having
their needs met, have reduced quality of support, and experience a higher likelihood of neglect or harm.
Staff working in such environments often face excessive workloads, which can result in stress, burnout, and
higher rates of absenteeism, further exacerbating the staffing issue. Additionally, understaffing can
undermine team morale, disrupt communication, and compromise the overall safety and effectiveness of
care delivery.
Such a situation would never be acceptable to the Health and Social Care Partnership, and therefore
bank staff are employed to address staffing shortfalls.  However, this again is not without its
challenges.  The Care Inspectorate notes that the use of bank or non-regular staff introduces personnel
to the unit who may lack familiarity with individual care plans, routines, and the specific procedures of
the service, leading to inconsistent or inappropriate care. The presence of bank staff can disrupt
continuity, making it harder to maintain person-centred relationships and trust. Furthermore,
85

Page 86

20 | P a g e
temporary staff may not always be fully trained or integrated into the team, requiring additional
supervision and support from regular staff, which places further strain on limited resources. These
factors collectively increase the risk of errors, reduce team cohesion, and can negatively impact the
overall quality of care.
The Partnership has dedicated significant time and resources into securing the necessary permanent
workforce, in a continuing effort to avoid reliance on agency and bank staff.  Measures include: 
• Glenartney Hotel, Brodick:  This is a 13-bedroomed building, purchased in February 2023, to
encourage individuals who lived off-island to secure posts on Arran and provide them with
accommodation on the island, whilst carrying out their duties.  This measure recognises the
difficulties of relying on ferries and sailings, which make it unviable to commute to Arran daily.
The hotel always has a high occupancy and is utilised by nursing, medical and social care staff.
• Recruitment & Retention Premium: In October 22, due to ongoing chronic recruitment
challenges (Band 5 staff), a successful bid to STAC secured a recruitment and retention
premium of 15%. This will remain in place until 30 September 2027.
• Recruitment Videos:  Recruitment videos of staff in teams with chronic vacancies were
prepared and issued with job adverts.  The goal was to not only showcasing the benefits of an
Arran lifestyle, but to also allow potential applicants to glimpse the work environment team
dynamic and improve engage with job adverts - videos often help capture more attention than
text-only listings and reach a broader audience. 
• Appoint a Recruitment Agency:  In December 2023, funding was approved to appoint a
recruitment agency ‘Big Blue Dog’.  A 20-week recruitment campaign was launched in January
2024, supported by social media, and two-weekly catch-up review meetings.  As a result, some
posts received multiple views which converted into applications. The results of this exercise are
included in Appendix 3. 
• Facebook: A dedicated page was developed and HSCP vacancies on Arran are uploaded with
links to access job applications.
• Relocation costs: These are provided to staff on lower grades/bands moving to the island.
• NES Recruitment & Retention Stakeholder Group: The Senior Manager, Arran Services was
selected to be a member of this group due to the innovative recruitment practice and
campaigns that had been delivered on Arran. This stakeholder group was developed by the
National Centre for Remote and Rural Health and Care in order to work collaborative at a
national level to address ongoing recruitment challenges.
• Recruitment Events: The Partnership hold regular events on the mainland for all NAC posts,
and these are advertised via leaflets, royal mail, West FM, newsletters, Facebook and at PPE
drop off points.  Staff at these events assist potential candidates, discussing role profiles.
Information sessions for ‘Arran’ vacancies were held both on the mainland and on Arran.  
• Staff Development: We have introduced a suite of staff training initiatives, including bespoke
courses tailored to individual roles and departmental needs. Additionally, we have supported
employees in pursuing further education and professional qualifications, ensuring staff are
equipped with both practical skills and strategic thinking capabilities. Our commitment serves
not only to enhance performance but also plays a key role in staff retention, creating a culture
where individuals feel valued and invested in. By fostering continuous learning, we aim to
position ourselves as an attractive employer and build a workforce ready to meet evolving
challenges.
86

Page 87

21 | P a g e
Despite best efforts, new appointments have been offset by staff leaving the Partnership’s employ.   
87

Page 88

22 | P a g e
Options Appraisal
This section presents a detailed appraisal of four strategic options for the future of Montrose House.
Each option is evaluated based on financial viability, workforce sustainability, service quality, and
community impact. The options under consideration are:
• Option 1: Do Nothing/Status Quo
• Option 2: Service Closure
• Option 3: Reduce Service to 10 Permanent Care Beds
• Option 4: Reduce to 10 Permanent Care Beds + 1 Respite Bed + flexible Day Care Model
Option 1: Do Nothing / Status Quo
Under this option, Montrose House would continue to operate with 15 permanent care beds, one
respite bed, and one step-down bed. No structural or operational changes would be made to address
the ongoing financial, workforce, or service delivery challenges.  The day service would remain closed
under the current arrangements with no access to day care opportunities on the island.
Recruitment is an ongoing challenge on the island (see ‘Recruitment Section, page 18), with any
positive recruitment gains offset by staff leaving employment at Montrose House.  The current staffing
model, which relies heavily on agency staff due to persistent vacancies, would therefore have to
remain in place.
The current rota is to cover the current dependency needs of the 15 residents and the 1 respite bed.
With the level of vacancies and current NAC contracted staff there is no scope to reduce the staffing
pattern without reducing bed numbers and remain within budget. Resident profiles have been gathered
describing information on each resident's care needs, date of admission and family/relative situation.
An extensive recruitment campaign, which spanned the financial years 23/24 and 24/25 assisted in
recruiting 4 care staff and 1 activity coordinator over a 12-month period. However, in that same
timeframe 4 social care staff left employment. There are current adverts out but no significant change
to indicate the remaining vacancies will be filled in the next 12 months.
The Equality Impact Assessment found that the do nothing option allowed the continuation of
permanent care beds for island residents on Arran. There are already on average between 3-4 (currently
2) people at any one time either in hospital at Arran War Memorial or in the community waiting for a
permanent care bed at Montrose House and a number of residents have had to choose an interim bed
on the mainland over the last few years. There would need to be clear information for relatives that
there will need to be some permanent care off the island and this information will need to be
proactively discussed and shared with any prospective residents and their relatives. 
Quality Impact
Maintaining the status quo would allow for the continued provision of on-island permanent care for
residents of Arran, which is a significant benefit in terms of continuity of care and community cohesion.
However, the quality of care is at risk due to the ongoing reliance on agency staff, which affects
continuity, familiarity, and potentially the standard of care delivered. The current staffing model is
fragile, with high turnover and limited success in recruitment, which undermines the ability to provide
consistent, person-centred care.  Social care posts require formal registration with the Care
88

Page 89

23 | P a g e
Inspectorate which has a requirement for a formal social care qualification.  The Partnership also
invests in a high standard of training, learning and development for its social care roles due to the
nature of care provision.  Agency staff are not subject to the same registration and/or training
requirements.
A formal inspection, as described within this report, has highlighted the concerns regarding quality-of-
care provision and staffing within the Care Home.  Whilst this has improved recently, this remains
fragile and is regarded as an ongoing risk.  
Financial Impact
The financial implications of the do-nothing option are significant. Despite high staff vacancy levels
Montrose House has been in an overspend position for the previous 2 financial years, ending 24/25 with
a £465k overspend.   A substantial portion of this overspend is attributed to the use of high-cost agency
staff to cover vacancies. Despite ongoing recruitment efforts, there is little evidence to suggest that the
remaining vacancies will be filled in the next 12 months, with the retention of existing staff, an ongoing
risk for further financial instability.
While there is some consideration of increasing charges to offset costs, this is unlikely to fully mitigate
the financial pressures. The current model is not financially sustainable, and continuing with the status
quo would likely result in continued or worsening overspends.
Workforce Impact
The workforce impact of maintaining the current model is considerable. The service has experienced
persistent recruitment challenges, with a net zero gain in staffing over the past year. The reliance on
agency staff not only increases costs but also places additional strain on permanent staff, who must
manage the operational and clinical risks associated with a transient workforce.
There is no scope to reduce staffing levels without reducing bed numbers, which would further impact
service availability. The current staffing model is not resilient and does not support the development of
a sustainable, skilled, and stable workforce.
Benefits & Risk
Benefits Risks
Maintains current level of on-island permanent
care provision which also supports community
cohesion and reduces the need for off-island
placements.
Financially unsustainable – 24/25 overspend of
£465k
No disruption to residents, families, or staff
routines
High reliance on agency staff (£620k cost in 24/25),
impacting continuity and quality
No capital investment required Persistent workforce instability and high vacancy
rates
Familiarity with existing systems and
environment
Inability to meet increasing demand for care,
particularly as the population ages 
Retains all current beds and services Risk of service failure due to unsustainable staffing
patterns 
Supports continuity of care for current
residents
Does not align with integrated care or modern
service models
Hospital Discharge/Flow  Missed opportunity to modernise care delivery and
align with integrated, person-centred models of care
89

Page 90

24 | P a g e
Benefits Risks 
No day service provision
While the do-nothing option preserves the current level of on-island care provision, it is not a viable
long-term solution. The model is financially unsustainable, operationally fragile, and does not support
the strategic direction of integrated, community-based care. Without significant change and additional
financial investment, the risks to service quality, workforce stability, and financial viability will continue
to escalate.
Option 2: Service Closure
This option proposes the full closure of all permanent care beds at Montrose House. The permanent
care function would be discontinued, and staff would be redeployed into wider community services.
This would represent a fundamental shift in the model of care on Arran, with all long-term care needs
met off-island.
Quality Impact
The closure of permanent care beds on Arran would have a profound impact on the quality of care for
older residents. The absence of on-island permanent care would significantly reduce the ability to
provide person-centred, community-based care for those with high-dependency needs.
The loss of local provision would likely lead to increased isolation for residents placed on the mainland,
particularly given the known challenges with ferry reliability and travel logistics. The emotional and
psychological impact on residents and their families—particularly in terms of reduced contact and the
disruption of established social networks—would be considerable. There is also a risk that such a
move could be perceived as contrary to the principles of equitable access and community
sustainability, particularly in the context of island-specific legislation and the Scottish Government's
Island Communities Impact Assessment framework.
Financial Impact
From a financial perspective, this option offers the potential for significant savings circa £1.2m. The
closure of permanent care beds would eliminate the high costs associated with staffing and
maintaining a 24/7 residential care facility. 
However, these savings must be weighed against potential increases in third-party payments for off-
island placements, transport costs for families, and the broader economic impact of job losses and
reduced public sector presence on the island. Additionally, there would be ongoing costs associated
with maintaining a partially used or vacant building, unless a full repurposing or disposal strategy is
implemented.
Workforce Impact
The workforce implications of this option are significant. While some staff could be redeployed into
wider community services, the overall reduction in service provision would likely result in
redundancies, particularly among night staff and those supporting high-dependency care. This would
represent a loss of skilled care workers from the island, further reducing the resilience of the local
health and social care system.
90

Page 91

25 | P a g e
Moreover, the closure of permanent care beds would remove a key employment opportunity on Arran,
potentially exacerbating existing challenges around recruitment and retention in the wider care sector.
The loss of experienced staff could also impact on the quality and continuity of other services,
including community-based care.
Benefits & Risk
Benefits Risks
Potential for substantial cost savings through
reduced staffing and operational overheads.
Loss of all on-island permanent care provision, with
significant implications for residents and families.
Potential to repurpose Montrose House for
alternative community or health uses, subject
to strategic planning.
Increased isolation and emotional distress for
residents placed off-island
Reduced reliance on agency staff Likely redundancies and loss of skilled workforce
Aligns with financial recovery goals Potential breach of island equality and access
principles, risking reputational damage and
community opposition.
Simplified service model Strong potential for community opposition 
Risk of triggering legal or human rights challenges
related to isolation and access to family life. 
Increased reliance on mainland placements, with
associated travel, cost, and emotional burdens. 
Requirement to maintain an empty building unless it
can be repurposed 
Likely to affect the discharge flow from the local
hospital 
Undermining of the broader integrated care model and
local service sustainability. 
Likely reputation damage to the Council and NHS
While this option may offer financial efficiencies and a simplified service model, it is not aligned with
the strategic objectives of maintaining equitable, community-based care on Arran. The risks to quality,
workforce stability, and community cohesion are substantial. In the context of Arran being a remote
island with no alternative care home provision, the full closure of permanent care beds would
represent a significant service withdrawal and is likely to be unsustainable from both a social and
political perspective.
Option 3: Reduce to 10 Permanent Care Beds
This option proposes a reduction in the number of permanent care beds at Montrose House from 15 to
10. There would be no respite provision, and no day care service introduced. The revised model would
operate within the limits of the current contracted staffing establishment, significantly reducing the
reliance on agency and bank staff. This approach aims to improve financial sustainability and
workforce resilience while maintaining a level of on-island permanent care provision.
The Equality Impact Assessment noted that this will have an adverse impact on relatives/families'
access to visits to loved ones in permanent care. With a reduction in beds there will be at least 3 to 6
people per year accessing a mainland permanent care bed. 
91

Page 92

26 | P a g e
Quality Impact
Reducing the number of permanent care beds would allow the service to operate within a more
sustainable staffing model, thereby improving the consistency and quality of care. By relying less on
agency staff, the service could enhance continuity, familiarity, and trust between residents and
carers—key components of person-centred care.
However, the reduction in bed capacity would inevitably increase waiting times for on-island
placements. This may result in more residents being placed in mainland care homes, which could
negatively affect their wellbeing and family contact. The impact on quality of life for residents placed
off-island—particularly in terms of social isolation and reduced family visits—must be carefully
considered, especially given the known challenges with ferry reliability and travel costs.
Financial Impact
This option offers a more financially sustainable model than the status quo. By aligning bed numbers
with the available permanent workforce, the service can significantly reduce its dependency on costly
agency staff. The projected reduction in agency and bank spend, combined with a more efficient use of
contracted staff, would bring the Unit closer to a balanced budget.
While some income would be lost due to the reduction in bed numbers, this would be offset by the
savings in staffing costs. The financial modelling suggests that this option could eliminate the current
overspend, making it a viable medium-term solution.
Workforce Impact
The workforce implications of this option are largely positive. By reducing the number of beds to match
the available staffing establishment, the service can operate more predictably and sustainably. This
would reduce the pressure on existing staff, improve morale, and potentially enhance recruitment and
retention by offering a more manageable and supportive working environment.
However, the reduction in bed numbers may limit opportunities for staff development and
specialisation, particularly in managing more complex care needs. It may also reduce the overall
number of care roles available on the island, which could have longer-term implications for workforce
planning.
Benefits & Risk
Benefits Risks
Improved financial sustainability through
reduced agency use
Greater likelihood of residents being placed in
mainland care homes, with associated emotional
and logistical challenges for families.
Better alignment between staffing levels and
service delivery
Longer waiting times for permanent care beds
Retains core on-island care provision,
supporting community cohesion.
Potential community concern over reduced
provision
Enhances workforce stability and morale Reduced flexibility to respond to short-term surges
in demand
Avoids redundancies; supports continuity of
care
May limit staff development opportunities
Reduced operational risk and improved service
resilience.
No island-based respite provision
92

Page 93

27 | P a g e
Benefits Risks
Enhanced continuity and quality of care due to
a more stable workforce
Risk of under-provision if demand for on-island care
increases beyond the reduced capacity. 
No island-based day care opportunities
This option represents a pragmatic compromise between maintaining local care provision and
addressing the financial and workforce challenges facing Montrose House. While it does not fully meet
the demand for on-island care, it offers a more sustainable and resilient model that preserves core
services and reduces operational risk. Careful management of admissions, transparent
communication with families, and the development of a prioritised waiting list/admissions policy for
island residents would be essential to mitigate the risks associated with reduced capacity.
Option 4: Reduce to 10 Permanent Care Beds + 1 Respite Bed +
flexible Day Care Model
This option proposes a reconfiguration of Montrose House to reduce the number of permanent care
beds from 15 to 10, while protecting respite provision from (one bed) and re-introducing a flexible day
care provision. The model would operate within the existing contracted staffing establishment, with a
focus on reducing agency dependency and improving service sustainability. This option also aligns with
the broader strategic aim of enhancing community-based care and supporting carers through
increased respite availability and day care opportunities.
The Equality Impact Assessment noted that this will have an adverse impact on relatives/families'
access to visits to loved ones in permanent care. With a reduction in beds there will be at least 3 to 6
people per year accessing a mainland permanent care bed. 
Quality Impact
This option retains a meaningful level of on-island permanent care provision while also protecting the
provision of respite capacity and day care opportunities, which is a critical support for unpaid carers
and families. The reduction in bed numbers is designed to match the available workforce, thereby
improving the consistency and quality of care through reduced reliance on agency staff. This is
expected to enhance continuity, familiarity, and trust between residents and carers.
The retention of a respite bed would increase flexibility in responding to planned and emergency respite
needs, potentially preventing carer breakdown and unnecessary hospital admissions. However, as with
Option 3, the reduction in permanent care beds may lead to increased waiting times and a higher
likelihood of off-island placements, which could negatively impact residents and families.
Financial Impact
This option offers a balanced financial model. By aligning bed numbers with the available permanent
workforce, the service can significantly reduce agency and bank staff costs. The increased respite
provision is expected to be cost-neutral or revenue-generating, depending on occupancy and charging
models.
The financial modelling suggests that this option would bring the service close to a balanced budget,
with reduced overspend and improved cost control. It also avoids the capital costs associated with full
closure or new build options, making it a financially prudent medium-term solution.
93

Page 94

28 | P a g e
Workforce Impact
The workforce implications of this option are largely positive. By operating within the existing staffing
establishment, the service can reduce pressure on staff, improve morale, and enhance recruitment
and retention. The increased respite provision may also offer opportunities for staff to develop skills in
short-term, outcome-focused care.
However, the reduction in permanent care beds may result in a small reduction in overall staffing
hours, and the service will need to manage this carefully to avoid redundancies. The model also
requires continued flexibility and cross-skilling within the team to ensure resilience and
responsiveness.
Benefits & Risk
Benefits Risks
Improved financial sustainability through
reduced agency reliance.
Reduced permanent bed capacity may still lead to
unmet demand
Improved sustainability and reduced
overspend
Risk of under-provision if demand increases beyond
the reduced capacity
Retention of respite provision to support carers
and prevent crisis.
Requires careful workforce planning to avoid job
losses
Retains essential on-island care provision  Some community concern over reduced permanent
care capacity
Reduces agency reliance; improves staff
morale
Increased waiting times for permanent care beds on
Arran / Continued need for prioritisation and waiting
list management
Aligns with integrated care principles and
supports carer resilience
May require operational adjustments to manage
dual service types
Reduced workforce challenges – safer staffing Greater likelihood of residents being placed in
mainland care homes, with associated emotional
and logistical challenges for families.
Enhanced quality and continuity of care due to
a more stable workforce. 
Improved alignment between staffing levels
and service capacity. 
On island day care opportunities 
This option represents a well-balanced approach that addresses financial and workforce challenges
while maintaining essential on-island care provision. The retention of the respite bed strengthens
support for carers and enhances service flexibility. While some risks remain—particularly around
capacity and access—these are mitigated by the retention of a core permanent care function and the
potential for future service development. This option is likely to be the most sustainable and publicly
acceptable compromise in the current context.
94

Page 95

29 | P a g e
Recommendation & Conclusion
Option Quality
Impact
Financial
Impact
Workforce
Impact
Benefits Risks
1: Do
Nothing /
Status Quo
Continuity of
care
maintained,
but quality
undermined by
staffing
instability and
agency
reliance
Projected
overspend
24/25
expected to
continue
£465k 
Persistent
vacancies; high
turnover;
unsustainable
staffing model
Maintains
current
provision; no
capital
investment
required
Financially
unsustainable;
workforce
instability; risk of
service failure
2: Service
Closure
Loss of on-
island
permanent
care;
increased
isolation for
residents
placed off-
island
Significant
savings: all
costs avoided
on island (NB:
the need to
care for
individuals
will require to
be met
elsewhere
however)
Likely
redundancies;
loss of skilled
workforce;
reduced
employment on
island
Cost savings;
opportunity to
repurpose
building;  
Loss of local
care;
reputational risk;
legal and
equality
concerns;
community
opposition
3: Reduce to
10
Permanent
Care Beds
Improved care
quality through
reduced
agency use;
longer waiting
times for beds
Removal of
overspend
(approx.
£465k) NB
requires
further
financial
modelling
Better
alignment with
workforce
capacity;
improved
morale
Retains on-
island care;
improves
sustainability
Increased off-
island
placements;
reduced
flexibility
4: Reduce to
10
Permanent
Care Beds +
1 Respite
Bed +
Outreach
Day Care
Improved
continuity and
carer support;
some risk of
unmet
demand
Removal of
overspend
(approx. 465k)
NB requires
further
financial
modelling 
Sustainable
staffing;
supports carer
resilience
Retains core
care provision;
respite/day
care provision;
improves
resilience
Waiting times;
risk of under-
provision;
workforce
adjustment
needed 
The options appraisal has considered four potential configurations for the future of Montrose House,
each with distinct implications for quality, financial sustainability, workforce resilience, and
community impact.
Option 1, the status quo, is not sustainable. It maintains current service levels but at a high financial
and operational cost, with persistent workforce instability and a growing risk of service failure.
Option 2, full closure of permanent care beds, offers the greatest financial savings but at the cost of
removing all on-island permanent care provision. This would have significant negative consequences
for residents, families, and the wider community, and is likely to face strong opposition.
95

Page 96

30 | P a g e
Option 3, reducing to 10 permanent care beds, represents a more balanced approach. It improves
financial and workforce sustainability while retaining a core level of local provision. However, it does
not address the growing need for respite care and may still result in increased off-island placements.
Option 4, which combines a reduction to 10 permanent care beds with the retention of respite
provision and day care opportunities, offers the most pragmatic and sustainable solution. It aligns
service capacity with available workforce, reduces financial pressures, and enhances support for
carers. While some risks remain—particularly around access and capacity, these are mitigated by the
retention of essential services and the flexibility offered by access to respite.
In conclusion, Option 4 is the recommendation of this option’s appraisal.  It strikes a careful
balance between maintaining essential on-island care, supporting carers, and ensuring the
long-term sustainability of services within the constraints of workforce and budget.  
96

Page 97

31 | P a g e
Impact Assessments
The preferred options was subject to both an Equality and Children’s Rights Impact Assessment and an
Island Impact Assessment. The full assessments will be made available on the Council’s website, and
the findings are summarised below. 
The Equality Impact Assessment concluded that maintaining the quality and continuity of care,
alongside safe staffing levels, remains the central priority for Montrose House. In response to the
current 30% vacancy rate and reliance on agency staff, the Health and Social Care Partnership (HSCP)
proposes a reduction to 10 permanent beds and 1 respite bed, alongside the implementation of a
hybrid day service model. These changes will be managed sensitively, with no current residents
affected unless their care needs can no longer be met safely. An admissions policy will also be
explored to prioritise individuals with familial ties to the island. 
While the HSCP acknowledges the strong opposition from the island community and staff, as well as
the distress and financial burden associated with off-island placements, it is imperative that care is
delivered safely, in line with regulatory standards and within sustainable financial parameters.
Montrose House remains a valued part of integrated island services, and the HSCP is committed to its
future, contingent on securing safe staffing levels. 
The Island Impact Assessment concludes that the proposed changes represent a necessary response
to persistent staffing challenges and financial pressures. The introduction of a hybrid day service model
and the reduction in bed capacity aim to enhance service sustainability, safety, and quality of care.
While the prioritisation of residents with familial ties and ongoing performance monitoring are positive
steps, the potential impact of off-island placements, including emotional distress and increased travel
costs, remains a significant concern. 
Given the absence of viable alternative delivery models and mitigation mechanisms, the proposals are
considered proportionate and appropriate for the island context. Further review and community
engagement are planned to address any unintended consequences. 
97

Page 98

32 | P a g e
Appendix 1: SBAR Day Services May 2024 
Author Ruth Betley, Senior Manager
Topic Arran Services – Day Service Provision
Date May 2024 
Situation  1 The Day service on Arran has not re-started since it closed during the
pandemic. Before re-starting the service, there had been a review of day
service provision on both Arran and the mainland. 
On Arran due to the remote and rural nature of the island an opportunity
to pilot an outreach day service model was taken. The pilot took place
between May 2023 and March 2024. Following the first pilot of an
outreach model and second pilot was carried out utilising the existing
purpose built unit in Montrose House Stronach Day service. 
Now that the both phases of the pilot have concluded a decision on re-
starting day services on Arran needs to be made.
Background 2 The opportunity to review day service provision was taken as a result of
the service closing during the pandemic. The pilot of an outreach model
ran between May 2023-August 2023 and three health and social care
staff delivered the day service to an initial five service users, in and
around one of the more remote villages, Blackwaterfoot at the golf club,
which has a large activity/meeting room. 
The service ran one day per week between 10.30 to 15.30 and a variety of
activities were provided. Transport was arranged and provided by
relatives and friends on the whole. There were some service users who
needed transport and this was provided by adult outreach workers from
the social work team. 
The second phase of the pilot aimed to attract more service users, as
Stronach is located in Brodick and so is closer to the larger villages on
the island. The second phase ran from December 2023 to March 2024.
This had six service users, some were from the original pilot. 
Having the pilot in Stronach meant that a meal during the middle of the
session could be provided and a wider range of activities could be
provided, including access to the Montrose House gardens. 
All those involved including the service users felt there were significant
social benefits for service users and all activities planned were person
centred and planned according to care plans and specific outcomes. 
Service user’s relatives were also contacted and completed feedback
questionnaires.
98

Page 99

33 | P a g e
Comments from families of service users were very positive about both
pilots and in particular the respite that the service offered for them as
carers. 
The staff who provided the service for the pilot were all in substantive
posts already and this impacted on the ability of them to fulfil their
normal roles and could not be sustained in any future model. One of
these roles, health care support worker is now vacant. 
There are currently service users assessed or in the process of being
assessed for day service provision, so this represents unmet need on
Arran. 
Action 3 Now that the pilot phase is completed and feedback has been given a
decision on the next steps regarding day services on Arran is needed. 
At the moment there is a focus on recruiting into long standing
vacancies within the permanent care team for Montrose House. This
focus is planned over the summer months and will be reviewed in
September in terms of success and reduction in agency usage and
permanent staff being recruited. 
With this in mind and the challenges associated with recruitment and
capacity it is felt that any plans to re-start day services on Arran will take
at least 12 months to re-establish with a phased approach to staffing
and service user numbers. Utilising a model of both outreach which also
uses opportunities to utilise the previous day care space in Stronach. 
There is current resource in the budget for 12 service users, it is
proposed that a phase approach is taken with a view to providing for 6
service users by the end of 2025. There are 5 daycare posts within the
Day service establishment, one senior post and 4 part time day service
carers. The service will aim to provide outreach care depending on
numbers of eligible service users and their location on the island. In a
variety of locations including within the Stronach building. 
A short lived working group would need to be set up to develop a plan for
this initial phase, as well as considering staffing and recruitment for the
day service there are other implications for Montrose House in terms of
catering and cleaning staff. The use of existing staff from the social work
team to support the pilot is not a sustainable option going forward.
Recommendations 4 • To support the plan to re-establish day services on Arran utilising
an outreach model which will provide opportunities for support
across a range of locations, including within the former Stronach
Day Service building.
• To consider what transport options might be available and
ensure that users and carers are involved in the next steps for
the service.
• To establish a short life working group to develop detailed plans
from Spring 2025 to begin a phased start for 6 service users 
99

Page 100

34 | P a g e
Appendix 2: Engagement
Montrose House Consultation Report
Background 
North Ayrshire Health and Social Care Partnership sought feedback from residents, families and the wider
island community on a proposal to update services in Montrose House on the Isle of Arran. A planned
modification to the current residential care provision will be implemented. Montrose House will move from
15 permanent beds to 10 permanent care beds, and 1 respite bed. 
The review also includes a proposal to develop a new admissions policy that would prioritise people with
familial and community ties to Arran. 
Introduction
This report summarises the engagement activities undertaken by North Ayrshire Health and Social Care
Partnership (HSCP) to gather views and feedback from residents, families, the wider island community,
staff, professionals and partners.
Methodology 
Two tailored questionnaires were created to engage with different stakeholder groups:
• Residents, Families, and the Wider Island Community
• Staff, Professionals and Wider Partners
The questionnaires were hosted on Microsoft Forms and designed to be anonymous and accessible. The
questionnaires went live on 15 July 2025 and was initially scheduled to close on 29 July 2025 but was
extended to 1 August 2025 to maximise participation.  The consultation was promoted across all HSCP
social media platforms and circulated within the internal staff newsletter. 
To ensure inclusivity and reach, printed copies were made available at the local hospital and GP practices
and completed responses were manually inputted into the digital form to consolidate and streamline all
responses. In addition to this, the HSCP received 4 letters that have been attached as an appendix in this
report. (Appendix 1)  
An in-person consultation drop-in session was also held on Tuesday 22 July 2025 to provide face-to-face
engagement opportunities. (Appendix 2) 
To analyse the responses, two staff members independently reviewed all responses and allocated codes to
all open-ended questions. Each code was then grouped into categories before merging into higher-level
themes. In addition, a sentiment scale was used to indicate whether the response for that particular
question was ‘opposed’, ‘in favour’, or ‘unsure’.
Montrose House Consultation - Residents, Families and Wider Island
Community
There were 458 responses to the Residents, Families and Wider Island Community survey. 
Descriptive Statistics 
100

Page 101

35 | P a g e
Q.1 What is your age range?
The age distribution chart shows that
out of 458 total participants, 457
responded to the age question. The
majority of respondents are older
adults, with 40.3% aged 65 and over
and 27.1% between 55 and 64. In
contrast, younger age groups were
minimally represented, with only 5.7%
under the age of 35. This indicates that
the survey primarily attracted an older
demographic, with over two-thirds
(67.4%) of participants aged 55 or older. 
Q.2 Are you a resident of the Isle of Arran?
The pie chart shows that out of 458 respondents, the
vast majority, 94% (431 individuals) identified as
residents of the Isle of Arran. Only 6% (27 individuals)
indicated that they are not residents. This highlights
that the survey results primarily reflect the views and
experiences of people living on the Isle of Arran.
Q.3 If you are not a resident of the Isle of Arran,
which locality do you reside in?
Out of the 27 individuals who are not a resident of the Isle of Arran, 10 responded to this question asking
which locality they resided in. 4 reside in the Three Towns (40%), 2 in Irvine (20%), 2 in North Coast &
Cumbrae (20%), 1 in Garnock Valley (10%) and 1 in Kilwinning (10%). 
Garnock Valley
(Beith, Dalry,
Glengarnock &
Kilbirnie), 10%
Irvine, 20% Kilwinning, 10%
North Coast &
Cumbrae (West
Kilbride, Fairlie,
Largs & Skelmorlie),
20%
Three Towns (Ardrossan, Saltcoats &
Stevenston), 40%
If you are not a resident of the Isle of Arran, which locality do you reside in?
0.2% 0.7%
4.8%
12.0% 14.9%
27.1%
40.3%
Under 18
(1)
18-24
(3)
25-34
(22)
35-44
(55)
45-54
(68)
55-64
(124)
65+
(184)
What is your age range? (N=457)
No, 27,
6%
Yes, 431,
94%
Are you a resident of the Isle of
Arran? (N=458)
101

Page 102

36 | P a g e
Q.4 Do you have family living locally on
the Isle of Arran?
The majority reported having a spouse
(36%) and/or wider family (35%) living
locally. 18% said they have children on the
island, while 10% (48 respondents)
indicated they have no family living on
Arran. 
This suggests that most participants
have close or extended family ties
within the local community.
Q.5 Do you currently receive support from any of the following health and social care services on the
island? 
The chart indicates that the vast majority of
respondents, 82.8% (403 people) do not
currently receive support from health and
social care services on the Isle of Arran.
Among those who do, the most used
service is the Alert Alarm Service (6.8%),
followed by District Nursing (2.7%), Care at
Home (2.3%), and Montrose House
Residency (0.4%). Additionally, 5.1%
selected other services. This suggests that
while some support services are in use,
most respondents are not currently
accessing them.
For respondents that clicked ‘other’ 
- 1 access Occupational Therapy
- 3 access respite at Montrose House 
- 2 access HSCP Carers Service 
- 1 access mental health 
- 3 access GP 
- 3 access social services 
- 3 access self-directed support 
- 4 have a family member or friend accessing support
- 2 are on waiting list for services
- 2 are previous service users
18%
10%
36% 35%
Children
(84)
No family on
the island
(48)
Spouse
(165)
Wider family
(161)
Do you have family living locally on the
Isle of Arran?
2.3% 6.8% 2.7% 0.4%
82.8%
5.1%
Care at
Home
(11)
Alert
Alarm
Service
(33)
District
Nursing
(13)
Montrose
House
Resident
(2)
No
(403)
Other
(25)
Do you currently receive support
from any of the following health and
social care services on the island?
102

Page 103

37 | P a g e
Q.6 If you are not currently a Montrose House
resident, do you believe you would consider
using a care home service on the island in
future? 
The chart shows that a significant majority of
respondents (80% - 366 people) would
consider using a care home service on the Isle
of Arran in the future. An additional 17% (77
people) said “Maybe”, while only 3% (15
people) said “No.” This suggests strong
potential demand or openness to local care
home services among the community. 
Q.7 Are you aware of the current recruitment challenges across sectors on the Isle of Arran (health and
social care, retail, hospitality, tourism)? 
The chart shows that 97% of respondents
(444 individuals) were aware of the current
recruitment challenges across various
sectors of Isle of Arran, including health and
social care, retail, hospitality, and tourism.
Only 3% (14 individuals) were not aware. This
indicates a widespread recognition of
staffing difficulties across the island’s key
industries. 
Maybe, 77,
17%
No, 15, 3%
Yes, 366,
80%
If you are not currently a Montrose
House resident, do you believe you
would consider using a care home
service on the island in future?
No, 14,
3%
Yes, 444,
97%
Are you aware of the current recruitment
challenges across sectors on the Isle of
Arran (health and social care, retail,
hospitality, tourism)?
103

Page 104

38 | P a g e
Q. 8 How do you feel about the recent change in bed capacity at Montrose House (from 15 permanent
beds to 10 permanent beds and 1 respite bed)?
All individuals answered this question totalling 458 responses. 97.6% (447) of recipients opposed the recent
change in bed capacity at Montrose House. 1.5% (7) were in favour and 0.9% (4) were unsure if it was the
correct move. 
Key themes:
Comments from the responses for this question were categorised into the following themes: 
• Strong Opposition and Emotional Distress
• Primary Concerns About Mainland Relocation 
o Forced Displacement from the island/ Family Separation
o Personal and Family Impact Stories
• Ferry Service Complications 
o Visiting Challenges 
• Staffing and Quality of Care Perspectives 
o Understanding of Staffing Challenges 
o Conditional Support for Quality Care 
• Use of Purpose-Built Facility 
o Underuse of Purpose-Built Facility 
• Distrust of Motivations 
o Suspicion of Cost-Cutting 
• Demographic and Demand Considerations 
o Ageing Population Needs 
• Impact on Other Services
o Pressure on Healthcare System 
Strong Opposition and Emotional Distress
The overwhelming majority of respondents (277) expressed intense negative reactions to the bed capacity
reduction at Montrose House. The emotional response was particularly strong, with participants using
terms such as:
"Absolutely atrocious" and "shocking and shameful"
"Appalling," "disgraceful," "unacceptable," and "terrible"
"Totally unacceptable"
These reactions reflect deep concern about the impact on Arran's elderly population and their families. 
Primary Concerns about Mainland Relocation
Forced Displacement from the Island and Family Separation
A central worry among 105 respondents is that the reduction will force elderly residents to seek care on the
mainland, separating them from their lifelong community.  
Key concerns include:
• Elderly long-time residents being forced to leave Arran for mainland care 
• Isolation from family and friends due to geographic separation 
104

Page 105

39 | P a g e
• Significant emotional distress for residents who must relocate 
• The fundamental objection to forcing elderly people off the island for care
Some examples of this are below: 
“This is a change in the wrong direction. Elderly long-time residents are having to leave the island for the
mainland for care. MORE beds are needed, not less.”
“Forcing elderly people off the island to a mainland care home for want of a local care home place is
entirely unacceptable.”
Personal and Family Impact Stories
44 respondents shared distressing personal experiences of family members being unable to secure beds at
Montrose House 
These accounts include:
• A father who was "extremely distressed" after being moved off the island before his death 
• An 87-year-old aunt who had lived her entire life on Arran but had to move south due to lack of space 
• A wife's mother who was sent to mainland care because there "wasn't enough space for her and her
needs" 
• Previous positive experiences where daily visits were possible when family members were at
Montrose House 
“My dad was moved off the island before he passed away which caused him to be extremely distressed. I do
not want my mum to experience this too”.
“My aunt who had lived ALL of her 87 years on Arran had to move south to live with her daughter as no room
for her at Montrose house where her peers and wider family could visit.” 
Ferry Service Complications
Visiting Challenges
The unreliable ferry service compounds concern about mainland care placement and was raised by 40
respondents.
Specific issues identified include:
• Difficulty maintaining regular visits due to uncertain ferry schedules 
• Early last ferry times (6pm) forcing visits to be cut short 
• Expensive and nearly impossible short-notice visits 
• Complete impossibility of urgent visits outside ferry operating hours 
• Additional stress from ferry unreliability during already difficult situations 
“Visits from husbands and wives, children and grandchildren will be more difficult, not helped by our
uncertain ferry situation.” 
“Visiting is expensive and almost impossible at short notice and should an urgent visit be needed impossible
outside ferry times.”
105

Page 106

40 | P a g e
Staffing and Quality of Care Perspectives
Understanding of Staffing Challenges 
While expressing disappointment, 51 respondents acknowledge the staffing difficulties behind the
reduction. 
Their responses include:
• Recognition of recruitment challenges on the island 
• Understanding of difficulties in staffing residential facilities 
• Appreciation for the council's challenging position 
• Distinction between acceptable staffing-related reductions versus unacceptable cost-cutting
“If this is due to recruitment issues then it is understandable. If it is just a cost cutting exercise then it is
entirely unacceptable.”
“I have a very clear understanding of how difficult it is to recruit staff here in the island and appreciate all the
challenges that this brings to staffing a residential facility!! With this in mind I understand why the council are
now in this position of thinking about reducing the beds available in Montrose house.”
Conditional Support for Quality Care
A small minority of 7 respondents expressed conditional support if the reduction ensures better care
quality.
These respondents noted:
• Support if it helps with staffing and maintains good quality care 
• Agreement that quality of care should take priority over quantity of beds 
• Recognition that maintaining staff employment and care standards may justify the reduction 
• Acknowledgment that this approach "may well be the best way forward”
“If it helps with staffing and providing good quality care, I support the move but it is a blow for Arran as the
island needs a lot more in terms of residential care.”
“Quality of care should take priority over quantity of beds.” 
Facility Utilisation Concerns
Underuse of Purpose-Built Facility
149 Respondents expressed frustration about the underutilisation of Montrose House relative to its design
capacity 
Key points include:
• The facility was purpose-built and expensive but has never operated at its full 30-bed capacity 
• Current reduction to 10 permanent beds plus 1 respite bed represents significant underuse 
• The building was designed for 30 beds, making the reduction seem wasteful 
• Previous operation with at least 20 beds and a day care centre showed the facility's potential
106

Page 107

41 | P a g e
“Montrose, a purpose built (expensive) facility, which has never operated at its full capacity of 30 is now
going to be limited to 10 + 1 respite?”
“It is a waste of a purpose-built modern facility. It does not meet the requirements for island residents.” 
Distrust of Motivations
Suspicion of Cost-Cutting
6 respondents believe the reduction is primarily motivated by financial considerations rather than care
quality. 
Their concerns include:
• Viewing the reduction as "just a cost cutting exercise" that is "entirely unacceptable" 
• Perception that fewer service users means helping fewer people in need 
• Belief that the proposal is "more of a cost cutting exercise than a strategy to benefit the ageing
community" 
• Suspicion that despite "window dressing," the real motive is cost reduction 
“Money saving idea. Just means we go from 15 to 10 service users. We help less people and those in need
are ignored all in the name of cost cutting.”
“This entire proposal appears to be more of a cost cutting exercise than a strategy to benefit the ageing
community on Arran.”
Demographic and Demand Considerations
Ageing Population Needs 
79 Respondents argued that Arran's ageing population requires more, not fewer, care beds 
Their arguments include:
• Recognition of an existing ageing population with current elderly residents 
• Expectation that demands for residential care will only grow in coming years 
• Belief that an ageing population combined with unreliable mainland transport necessitates more
local capacity 
• Assessment that the reduced number is inadequate for an island with an ageing population
“We have an ageing population and already have a number of elderly residents so why reduce capacity at a
time when the island is in great need.”
“Arran has an ageing population, and the demand for residential care is only expected to grow in the coming
years.” 
Impact on Other Services 
Pressure on Healthcare System 
The reduction is expected to create additional strain on other local health and social care services. Specific
concerns from 17 respondents include:
107

Page 108

42 | P a g e
• The hospital being used as an extension of Montrose House when care home beds are unavailable 
• Increased risk of bed blocking at the Community Hospital when patients cannot be discharged to
Montrose House 
• Home carers being pushed to their limits before crisis situations develop 
• People living at home until emergency respite or immediate solutions become necessary
“The hospital in Lamlash is often seen as an extension to Montrose house with wards full of patients unable
to return home (as care at home are unable to provide the care they need) and unable to get a bed in
Montrose house as it's at capacity.”
“There is also the risk of bed blocking at the Community Hospital if there are no available beds in Montrose
House for patients to be discharged to if they are unable to be looked after at home.”
Q. 9 Do you have any views on the proposed admissions policy that would prioritise applicants with
familial ties to Arran for access to Montrose House care home beds?
All individuals answered this question totalling 458 responses. 
Key Themes:
• Sentiment Towards Policy 
o In Favour of an Admissions Policy
o Opposition of an Admissions Policy 
o Unsure of an Admissions Policy
• Preferred Admissions Criteria 
o Residency Based Prioritisation
o Familial Ties and Community Networks
o Length of Residency
o Needs Based Prioritisation
• Concerns About the Policy
o Policy Definition
o Policy Implementation 
o Capacity Limitations
o Impact on Arran Economy and Community 
o Perceived Injustice / Discrimination
• Requests for Transparency and Consultation 
• Calls for increased Service Resource 
Sentiment Towards Policy 
In Favour of an Admissions Policy 
The majority of respondents, 296, expressed strong support for an admissions policy that prioritises Arran
residents and those with familial ties to the island. 
“Yes those with family on the island should be prioritised over those whose family are on the mainland”,
“Absolutely support this”, “brilliant and long overdue proposal”, “This should ALWAYS be a prerequisite for
Montrose House beds!”, “This question is a no brainer”, “It SHOULD prioritise local/familial ties”, “An
excellent idea which should be implemented regardless of the any ongoing consultation.”
164 respondents were surprised this wasn’t already in place and viewed it as common sense and long
overdue.
108

Page 109

43 | P a g e
“I can't for the life of me understand why this wouldn't already be the case. Extremely perplexing.”, “I
thought that should already apply.”, “This is sensible, and should always have been the policy.” “I assume
this is already in place? If not, it absolutely should be”, “I am surprised to hear that this is not already the
case. This should absolutely be the admissions policy.”
Opposition of an Admissions Policy 
However, a smaller but vocal group of 32 respondents opposed the policy, citing concerns about fairness,
exclusion, and emotional distress for those without family on the island. 
“To uproot people against their will when they are at a very vulnerable stage in their lives I feel is cruel.”,
“Why?  All sections of the community need help and support.”, “I think this could be disastrous for people
who have no family left and there only friends are on island.”, “This would not have worked for our elderly
neighbour - she has no family and relies on lifelong friends on Arran.”, “Arguably those with familial ties to
the island should be at the back of the queue because they will have family on the island to fill the gaping
chasm in care provision”, “I think it is unfair to have a policy like this. Every elderly Person deserves to be
considered, regardless of whether or not it they have family on the island.”, “The admissions policy should
not be restricted to residents with family.”
Unsure of an Admissions Policy
18 responses noted they were unsure of the proposed admissions policy and requested more detail before
forming an opinion. 
“Seems like a good idea but not entirely convinced.”, “I'm not sure it should be as black and white as that.”,
“I would need more specific details on this policy before I could comment, as this is a very generalised
statement.”, “It depends how it would work”  
Preferred Admissions Criteria
A total of 306 comments were made around preferred admissions criteria if a policy was in place. 
Residency Based Prioritisation
The most common suggestion, with 164 comments, was to prioritise current or long-term residents,
regardless of family ties. There were many concerns about people who retire to the island or having a
second home on the island taking precedence over those who are island born or have lived there for a
number or years. Despite this being the most cited suggestion, there were concerns around how it would
work in practice, and how ‘resident’ would be defined. 
“People who reside permanently on Arran should have priority.”, “Anyone who lives full time on Arran
deserves to receive care when necessary, on the island.”, “Residents only unless there are special
reasons.”, “Too many people retire to the island with no family ties and take up all the resources.”
Length of Residency
A significant number, 76 respondents, felt that the policy should not just prioritise Arran residents, but the
length of residency on the Island should be a key factor in prioritising admissions. 
“It must be for Arran residents only, with a residence on the island for a minimum of 5 years with no breaks.”
, “I think people who have lived here for longer than 30 years should definitely get priority.”, “If born and bred
on Arran or lived and worked here for considerable years, you should be prioritised.”  
Familial Ties and Community Networks
109

Page 110

44 | P a g e
Many supported prioritising applicants with family on the island, especially to facilitate visits and maintain
emotional wellbeing.
“Yes, those with family on the island should be prioritised.” ,“My father ended up on the mainland in the
winter due to the weather and boats not sailing. I could not visit him as often.”, “It makes sense to keep
Arran residents close to their families.”
However, it was felt strongly by 49 respondents that familial ties should be extended to those with strong
community networks and friendships. 
“In the current social context friends can be as much family as blood relatives.”, “Support networks within
the community are not restricted to family members.” ,“People like this should also be a high priority.”
,“Friends can be as much family as blood relatives.”  
Needs Based Prioritisation
17 respondents advocated for prioritisation based on clinical or social need, rather than residency or family
ties.
“Priority should be given on patient needs, not family connections.”, “Care should be provided for all at the
point required.”, “Each case should be taken on an individual basis.”  
Concerns About the Policy
Policy Definition
Some respondents found the term vague and requested a clearer definition before making comment on the
criteria, or if they agree with the proposal.
“What is the clear definition of familial ties?”, “Define ‘familial ties to Arran’! Meaningless statement as is.”,
“Does a grandmother or aunt count?”,” A potential minefield; a clear policy unambiguous policy is
required.”
Implementation Challenges
29 concerns were raised about fairness, enforceability, and unintended consequences of introducing an
admissions policy.
“It would have to be done in a fair and unbiased way.”, “This will split the community and create
unnecessary conflict.”, “Easy to target people without family to support them or advocate for them.”, “The
public isn’t stupid—it won’t be manageable.”, “I don't see how any one priority system would work well.”
Capacity Limitations
The reduction in bed numbers was a major concern, often seen as the root issue by 31 respondents,
regardless of an admissions policy. 
“We do not need reduction in beds—we need more beds.”, “With only 10 permanent spaces, many people
will find there isn’t a vacancy when they need it.”, “Even with prioritisation for people with familial ties the
lack of beds will be an issue.”, “There is a big need for more beds rather than this” 
Impact on Arran’s Economy and Community
5 respondents felt the policy could deter new residents of working age to move to the Island and harm the
island’s inclusivity. 
110

Page 111

45 | P a g e
“This discourages people from moving to Arran.” “It damages the local economy as incomers will consider
not living here.” “We need new people in the community.”, “this is going to drive people away from the
island”
Requests for Transparency and Consultation
Respondents asked for clearer communication of both current and proposed policies, as well as statistics
of current Arran residents who are placed in care homes on the mainland.
“Let us see both the existing and proposed admissions policies.”, “How many current residents have no
connection to Arran?”, “I would need to see a written policy before being able to comment.”, “Would
welcome more details- a difficult area”, “More clarity on what the proposals fully entail is required.” 
There was a strong desire for ongoing dialogue and community involvement.
“Further consultation is essential.”, “Listen to the community, not the pencil pushers.” 
Calls for Increased Service Resource
6 comments suggested more recruitment initiatives on the island, with change in pay and shift patterns to
address long standing recruitment issues. It was felt that addressing this would mean an admissions policy
would not be required.
“There is the staff out there—people are always desperate for work.” , “Change the working hours from 12-
hour shifts to 8-hour shifts.”, “Encourage and keep staff in the homecare system to enable our older
residents to get home.” , “I know that something drastic needs to be done to encourage and keep staff in the
homecare system”, “Providing accommodation for workers should also be considered.”
Q.10 Do you support the proposed admissions policy approach? 
The pie chart shows that 32% (145
people) support the proposed
admissions policy approach, while
23% (105 people) oppose it. An
additional 27% (125 people) are
unsure, 5% (24 people) would
support it with certain conditions,
and 13% (59 people) selected
"Other."
• 14 of the respondents that
chose ‘Other’ noted the
admissions policy should
prioritise residents. 
• 12 respondents felt there
was a lack of information, and more clarity was needed before commenting. 
• 9 respondents said their support would depend on the definition of familial ties. 
• 8 respondents favoured residency length as the criteria. 
• 4 respondents made clear they support the admissions policy, not the capacity change. 
Q.11 The HSCP is exploring plans to restart day-care service(s) on Arran utilising a flexible day care
model which would see supports delivered via an outreach service. Would you consider using an
outreach day-care service if it were available?
145, 32%
105, 23%
125, 27%
24, 5%
59, 13%
Do you support the proposed admissions
policy approach?
Yes
No
Not Sure
I would support it with
certain conditions
Other
111

Page 112

46 | P a g e
The chart shows that 73.1% of respondents (“Definitely”: 37.3% and “Possibly”: 35.8%) would consider
using an outreach day care service on Arran, while only 3.3% said No and 5.2% said Unlikely, with 18.3%
Unsure. 
Q.12 Is this a service you would be interested in learning more about? 
The below chart shows that 62%
respondents (283) are not interested in
learning more about the service while 38%
(175 people) expressed interest. 
Q.13 If yes, please provide your name and
contact details
Respondents were asked to leave contact
details if the option of ‘yes’ was chosen for
question 12. There were 124 email
addresses given and 15 phone numbers. 
Q.14 Do you have any concerns about the new or proposed changes? 
All individuals answered this question totalling 458 responses.
Key Themes:
• Sentiment Towards Proposed Changes 
o Concerns Expressed 
o No Concerns/ Uncertain 
• Core Issues raised 
o Bed Provision & Capacity of Services 
o Relocation to mainland 
o Personal Concerns and Community Impact 
o Staffing and Recruitment 
o Day Service Model
• Systemic & Structural Concerns 
o Finance, Budget and Investment 
o Transport and Accessibility 
37.3%
3.3%
18.3%
35.8%
5.2%
Definitely
(171)
No
(15)
Not sure
(84)
Possibly
(164)
Unlikely
(24)
The HSCP is exploring plans to restart day-care service(s) on Arran
utilising a flexible day care model which would see supports
delivered via anout reach service. Would you consider using an
out reach day-care service if it were available?
No, 283,
62%
Yes, 175,
38%
Is this a service you would be
interested in learning more about?
112

Page 113

47 | P a g e
o Consultation Process 
• Requests for Transparency, Reconsideration and Further Consultation 
Sentiment Towards Proposed Changes 
Concerns Expressed 
A significant majority — 378 of 458 respondents — expressed concerns about the proposed changes,
particularly regarding the reduction in care home beds and the future of Montrose House. 
“I have grave concern”, “Really very concerned”, “A GREAT many of concerns”, “I am extremely concerned
about this”, “Extremely worried” 
Out of the 378 respondents who noted concerns: 
- 45 gave no specific reasons
- 47 stated they had already addressed their concerns earlier in the consultation process. 
No Concerns/Uncertain 
24 respondents indicated they had no concerns regarding the proposals. 
“No immediate concerns.” “No as understand why they need to happen.”
Core Issues Raised 
There is a lot of intersectionality between the core concerns raised by respondents. 
Bed Provision and Capacity of Services
This was the most dominant theme, cited by 169 respondents. The reduction from 15 to 10 beds was widely
viewed as inadequate and dangerous, especially given Arran’s ageing population. 
- 31 respondents emphasised that Arran’s demographic trends demand more care provision, not
less.
“Arran’s population is increasingly elderly.” “We need to plan ahead for increasing beds, not reducing
them.”
Concerns included:
• Impact on hospital and home care services.
• Insufficient respite care for carers.
• Underutilisation of existing facilities. 
“Any reduction in beds below capacity (30) is unacceptable.” “We need more beds, not fewer.” “Montrose
House was purpose-built for more — why isn’t it being used?”, “too many people having to stay long term in
hospitals as not enough beds available as it is.”, “I have huge concerns about the proposed reduction in
residential care, and don’t believe that in-home care will be able to replace this.”, “Yes, we need more access
to a local care home with more bed availability, not less!!!” 
20 respondents feared this was the first step toward full closure of Montrose House. 
113

Page 114

48 | P a g e
“I feel it could be a route to closing the Montrose house which would be devastating.”, “If this ridiculous proposal goes
through then next year it will be 5 beds and then closed for ever.”, “My concern is this is the slippery slope to closure.”,
“I think if the amount of beds falls below ten that is the criteria for closure.” 
Relocation to Mainland
77 responses expressed deep concern about elderly residents being displaced to the mainland due to
insufficient local care capacity. These concerns were often emotive, describing the impact as traumatic and
isolating.
“You are sentencing our elderly to a traumatic move to the mainland.” “Families will be divided.” “I might die
on the mainland instead of on the island I have always called home.”, “This is totally cruel to the person
going into care”, “The thought of having to send family or one day myself to the mainland for care and not
have family local to pop in and visit and support them is terrifying”, 
Personal Concerns and Community Impact 
84 responses shared deeply personal accounts of how the changes would affect them or their families.
These stories often highlighted the emotional, logistical, and social consequences of reduced care
provision.
“I fear for my future self-growing older on Arran. For myself, assisted suicide will be a better option than
trying to navigate the support for older people and families.”, “Without services in place to support & protect
all residents this island will not have a future.”, “You might as well just shut shop on Arran”, “If my husband
or myself need to go to the mainland for care how will we see each other? We have been married for 71
years.” 
66 responses described the emotional toll of separation and uncertainty. 
“To be uprooted in their final years is appalling.” “This is terrifying — I’ve lived here all my life.” “Families are
left heartbroken.”, “Extremely concerned and appalled at the neglect Arran is treated to.”, “Everything I have
stressed above this made me very unwell anxiety stress etc” 
Staffing & Recruitment 
51 respondents cited staffing shortages as a root issue and called for:
• Incentivised pay for local workers
• Affordable housing for staff
• Recruitment strategies targeting young people  
“You pay a fortune for agency staff to come over rather than paying local staff a premium to cover when
needed.”, “We need more affordable housing for workers.”, “Many carers who would come to the island if
accommodation was provided for them and their families” 
Day Service Model
40 responses addressed the proposed day care model.
• Most welcomed the idea and shared positive personal experiences of services before closure.
• However, many expressed scepticism about feasibility due to staffing challenges.
• Many emphasised that day care cannot replace residential care.
114

Page 115

49 | P a g e
“I feel the return of day service is LONG overdue since it's closure during COVID and that it would help
tremendously.”, “I heartedly agree with expanding the Day-Care service, this could be a lifeline for residents
and families in need of this service.”,  “The day care service is welcomed and good use of resource but the
lack of residential spaces will be a major bottle neck for the care at home service, hospital and social work
colleagues” 
“A day service is not the answer.” “What has changed that makes this feasible now?” “Replacing full-time
care with part-time care will have a detrimental effect.”, “seems like someone has grouped some good
sounding words together. What actually does it mean? What form would this take in reality?”., “I can
confidently say there needs to be a day care centre as well as outreach. Outreach alone is not sufficient” 
Systemic & Structural Concerns 
Finance, Budgets & Investment
24 responses questioned the financial rationale behind the changes and called for better investment in local
services and staff. The proposals were seen to be short sighted and lacking in a wider investment strategy.
There were calls to review the resources available to NAC and invest appropriately. 
“This is a cost-cutting exercise, not a care strategy.” “We need investment, not reductions.”, “Our island
location requires specific and bespoke solutions, not further cuts.”, “Yes, you are slowly closing down all
services on the island yet millions wasted every year.”, 
Transport & Accessibility 
25 respondents cited ferry unreliability and geographic isolation as major barriers to care and visitation.
“The ferry situation makes visiting impossible.” “Transport issues compound the emotional distress.”,
“Going to the mainland is extremely challenging, both for the person concerned and for their family and
friends, not in the least because of the ferry situation which will continue for some foreseeable time.” , “the
boat situation will make it very difficult for us and my mother in law to visit.”, “Arran is a big island.  It takes
time to get from one village to another.  If lack of staff is a key issue, how will an outreach programme work
with all the nonproductive time spent travelling between patients.” 
Consultation Process 
14 responses criticised the consultation process as tokenistic and predetermined. Most of these responses
feel that the decision has already been made, and the HSCP asking the public for views is a tick box
exercise. Few comments note that the process was not advertised correctly, nor was the public given
enough notice to engage. 
“This is a done deal.” “Concerned this is already decided regardless of any consultation exercise!”, “reading
the notification it’s a fait accompli and this is just lip service”, “I know that these consultations generally
mean that the decision has been made and this’s all to shut us up.” 
Requests for Transparency, Reconsideration and Further Consultation 
• 25 respondents asked for clearer communication.
• 30 requested reconsiderations of the proposals.
• Many called for public access to key documents like the EQIA and Island Impact Assessment.
115

Page 116

50 | P a g e
It was felt strongly amongst these comments that there has been a lack of transparency, and the public
have been left without crucial details. Comments asked for documents such as the EQIA and Island Impact
Assessment to go public. 
“Let us see the full proposal.”, “More clarity is needed.”, “Reconsider this — it’s not workable.”, “We need
more information on the challenges, constraints, options and costs and a proper chance to discuss this important
issue which affects so many people on Arran.”
Q.15 Would you like to be involved in
Montrose House activities and future
engagement sessions? 
The pie chart shows that 69% of
respondents (316 people) are not interested
in being involved in Montrose House
activities and future engagement sessions,
while 31% (142 people) would like to be
involved. 
Q.16 If yes, please provide your name and
contact details (email or phone number)
There were 106 email addresses, and 22
phone numbers provided. 
Q.17 How would you like to be kept informed about future updates to Montrose House services? 
Email remains the most preferred method for updates (231 responses, 47.2%), followed by social media
(132 responses, 27.0%) and community meetings (68 responses, 13.9%), indicating a strong overall
preference for digital communication, while traditional or direct methods like phone (7 responses) and
printed newsletters (45 responses) are far less favoured. 
‘Other’ comments included six ‘NA’. 
Q.18 Any further comments?
43% (197) of all respondents chose to add further comments on this open-ended question. 
Key themes:
• Strong resistance to bed reduction 
47.2%
1.4% 9.2%
27.0%
13.9%
1.2%
Email (231) Phone (7) Printed Newsletter
(45)
Social Media (132) Community
Meetings (68)
Other (6)
How would you like to be kept informed about future updates to
Montrose House services?
No, 316,
69%
Yes, 142,
31%
Would you like to be involved in
Montrose House activities and future
engagement sessions?
116

Page 117

51 | P a g e
• Impact on Ageing Population 
o Previous Service Reductions 
o Limiting Care Alternatives 
o Growing Demographic Need 
• Family Separation/Emotional Distress 
o Forced mainland placement/ community disconnection 
o Family separation 
o Mental health implications 
• Ferry Service Complications 
o Transportation Barriers 
• Underutilisation Concerns 
• Service Expansion Opportunities 
• Staffing Solutions & Recruitment 
o Improved Compensation/ hours and recruitment advertising 
o Staff Accommodation 
o Training & Development 
o Affordable Housing Priority 
• Consultation Process Concerns 
o Trust & Transparency Issues 
• Financial & Policy Motivations 
o Cost Saving Priority 
o Questioning Original Investment 
• Long Term Perspective 
o Proper facility utilisation 
Strong Resistance to Bed Reduction
The community has expressed overwhelming opposition to the proposed reduction in bed capacity at
Montrose House. 57 respondents emphasised that Arran needs more beds, not fewer, particularly given the
island's ageing population.
This sentiment is reinforced by concerns that the reduction will compound existing challenges created by
previous care home closures on the island.
“I find these proposals extremely concerning, and everyone I have spoken to today feels the same. Let's
hope we can get some changes to this.”
“What is being suggested here is a disgrace., There not suitable ferry service, old people will not be able to
visit their loved ones. Shame on you..” 
Impact on Ageing Population
Several key concerns emerged regarding the specific impact on elderly residents:
• Previous service reductions (3 comments) - The island has already experienced the closure of two
care homes in Whiting Bay, making this reduction particularly problematic 
“Services for the elderly on the island have been drastically reduced, yet the population is ageing. it is very
difficult to get care at home which increases the need for residence. day care services and the provision of
NHS Carers at home would reduce the need for residence.”
117

Page 118

52 | P a g e
• Limited care alternatives (5 comments) - Difficulty accessing home care services increases the
need for residential care options 
“Arran has already seen the reduction in care beds with the closure of 2 homes in Whiting Bay in recent
years so this reduction in community spaces will only compound things and make life more difficult for
Arran residents.”
• Growing demographic need (25 comments) - The ageing population requires expanded, not
reduced, care capacity
“Arran needs more capacity for residential care for the elderly not less. Montrose House is not currently
used to its full potential, and you should be exploring ways to increase not decrease capacity.” 
Family Separation and Emotional Distress
Respondents frequently highlighted the devastating impact of forcing elderly residents to seek care off-
island:
• Forced mainland placement (19 comments) - Reducing capacity would compel families to place
loved ones in mainland care facilities 
“A week ago we had to put my mother in a care home on the mainland. It’s a nightmare and not being able to
pop in every day is heartbreaking. The state of the ferries doesn’t help of course. We always thought when
the time came, she would be able to stay in Arran.”
• Family separation (19 comments) - This creates significant emotional distress for both residents and
their families. 
“Please reconsider. As I said, we have many island locals living out their final years in strange rest homes on
the mainland away from their home and family. Please don’t take any away, it will only make things worse.”
• Mental health implications (20 comments) - The separation is viewed as unacceptable given current
understanding of its psychological impact. 
“Montrose house is a wonderful place. I have visited with my choir. The local school are involved. [Named
Staff member] and all staff are amazing. Please keep this vital resource available for Arran people with as
many beds as possible. I would be devastated if in the future, my husband and I had to be separated by
water because one of us needed care in our final years. It would be so detrimental to both our health.” 
Ferry Service Complications
Transportation Barriers
The unreliable ferry services create additional challenges for families attempting to maintain connections
with loved ones in mainland care, and 17 respondents left comments. 
“With the fiasco situation of ferries and Ardrossan harbours at the moment wouldn’t like to think of travelling
to see friends or family now or in the future.” 
118

Page 119

53 | P a g e
Facility Underutilisation Concerns 
13 respondents argued that Montrose House is not being used to its full capacity:
• Current underutilisation - The facility is not operating at its potential capacity 
• Historical demand - The previous Montrose facility was consistently full, indicating ongoing need 
• Wasted investment - The new purpose-built facility is seen as underutilised despite significant
public investment
“Why waste the capacity? It’s similar to hospitals with wards shut. It doesn’t make sense when there is a
demand for beds. This is not a solution, nor will it save money in the long run. “ 
Service Expansion Opportunities 
14 Community members suggested several ways to maximise the facility's potential:
• Reopening day care services - Restoring day care programs that have been missed since COVID 
• Respite care services - Providing respite beds for temporary care needs 
• Full bed capacity - Opening all 30 beds rather than reducing to fewer 
“Please save Montrose House. Get more beds open and respite beds and get the daycare open again. Thank
you” 
Staffing Solutions and Recruitment
Respondents identified staffing shortages as the underlying issue but proposed concrete solutions.
• Improved compensation/ Hours and recruitment advertising (25 comments) - better pay and
incentives to attract and retain staff 
“The amount spent on agency staff could have been better spent on enhancing wages for permanent staff,
and as for selling the old Montrose House, which would have made ideal staff accommodation for both
hospital and care home staff, to then buy a hotel was just sheer lunacy.”
• Staff accommodation (15 comments)- Providing housing for workers to address recruitment
challenges 
“If more permanent Staff accommodation could be found maybe the situation could be eased.”
• Training and development (5 comments) - In-house training programmes and support for staff
qualifications 
“Go back in time when the old Montrose House was in use with more beds and staff. need staff training for
career progression.” 
• Affordable housing (28 comments) - Addressing the fundamental housing shortage that limits the
available workforce. 
119

Page 120

54 | P a g e
“hugely improve pay and conditions, more social housing on island so carers can live in the community.
Engagement with schools to come to Montrose House. been proven to be positive for both residents and
children.” 
Consultation Process Concerns
Trust and Transparency Issues  
18 Respondents expressed significant scepticism about the consultation process:
“This so called consultation is wholly inadequate - with lack of information and detail to enable any serious
discussion. You have ensured that local elderly and, in some cases, vulnerable people are now anxious and
distressed and this was evident in the faces of those attending the meeting at Montrose House on 22 July.”
Financial and Policy Motivations
Many respondents viewed the bed reduction as primarily financially motivated:
Cost-saving priority (6 comments) 
“Person centred also means community centred. This proposal is not about the community, or the island
needs but about cost saving.”
The proposal is seen as driven by budget constraints rather than community needs. 
Questioning Original Investment 
3 Respondents questioned why the facility was built initially
“How can I relatively new building, built for purpose now be reduced to 10 beds, when the old Montrose was
open it was full all the time.” 
“Going back years there was a waiting list to get a job in Montrose house, fast forward 20 years and millions
spent on new build, staff cannot be found, maybe some research should be done to find out why.”
Long Term Perspective  
23 Respondents emphasised the need for sustainable, community-focused solutions such as increasing
the capacity needs and making the existing investment work effectively rather than reducing its scope. 
“Why waste the capacity? It’s similar to hospitals with wards shut. It doesn’t make sense when there is a
demand for beds. This is not a solution nor will it save money in the long run”
Montrose House Consultation – Staff, Professionals and Wider Partners 
There were 23 respondents to the Staff, Professionals and Wider Partners survey.
Descriptive Statistics 
120

Page 121

55 | P a g e
Q.1 What is your age range? 
The majority of respondents fall
within the 55–64 age range (10
individuals), followed by the 45–54
group (8 individuals). A smaller
proportion are aged 25–34 (4
individuals), and only 1 respondent is in
the 35-44 range. This suggests the
surveyed group is predominantly
composed of individuals aged 45 and
older. 
Q.2 Are you a resident of the Isle of
Arran? 
An overwhelming majority, 96% (22
out of 23 participants), are residents
of the Isle of Arran while only 4% (1
participant) is not. 
Q.3 If you are not a resident of the
Isle of Arran, which locality do you reside in? Q.4 Do you travel on to the island to provide services? 
For the one resident who does not reside on the Isle of Arran, they have confirmed they reside within the
North Coast & Cumbrae locality and do not travel on to the island to provide a service. 
Q.5 Do you have family on the Island? 
- 8 respondents reported having no family on the island.
- 7 respondents each indicated living with a spouse and having wider family locally.
- 1 respondent stated that their children live on the island.
However, this question did not give the option for multiple answers. 
Q.6 Which of the following health and social care services do you support on the island?
1
8 7 7
Children No family on the island Spouse Wider family
Do you have family living locally on the Isle of Arran?
4
1
8
10
25-34 35-44 45-54 55-64
What is your age range? (N=23)
No, 1, 4%
Yes, 22, 96%
Are you a resident of the Isle of Arran?
121

Page 122

56 | P a g e
The most commonly supported service from recipients completing this questionnaire was Montrose House
(21%) and the GP Practice (19%), followed by District Nursing (17%). Allied Health Professionals and
“Other” services each received 11% support, while Social Work was supported by 9%. The least supported
services were Care at Home and the Alert Alarm Service, each with 6%. 
‘Other’ includes: 
- 1 Carer’s worker  
- 3 Arran War Memorial Hospital workers 
- 1 community nursing worker 
Q.7 Do you believe you would refer a
patient or service user to use a care
home service on the island in future?
A significant majority (65%, or 15
respondents) answered "Yes" when
asked if they believed they would refer a
patient or service user to use a care
home service on the island in the
future.  Meanwhile, 26% (6
respondents) said "No," and 9% (2
respondents) were uncertain. 
6% 6%
17%
21% 19%
11% 9% 11%
Care at
Home
Alert Alarm
Service
District
Nursing
Montrose
House
GP Practice Allied Health
Professional
Social Work Other
Which of the following health and social care services do you
support on the island?
Maybe, 2,
9%
No, 6, 26%
Yes, 15,
65%
Do you believe you would refer a
patient or service user to use a care
home service on the island in future?
122

Page 123

57 | P a g e
Q.8 Are you aware of the current recruitment
challenges across sectors on the Isle of Arran
(health and social care, retail, hospitality,
tourism)?
All participants (100%) answered "Yes" when
asked if they were aware of the current
recruitment challenges. 
Q.9 Do you support the proposed change in bed capacity at Montrose House (from 15 permanent beds
to 10 permanent beds and 1 respite bed)?
The majority of respondents (61%)
did not support the proposed
change. They gave a clear "no" in
response to the questions and did
not qualify their answers.
The remaining respondents either
expressed agreement or provided
unclear responses.
Of those categorised as 'unclear'
(22%), comments included
statements such as "not sure" or
responses that did not directly
address the question.
Four professionals (17%) agreed
with the proposal, with only one
qualifying their feedback by
stating, "If that's all we can staff,
it's all we can staff." 
Q.10 How do you feel about the recent change in bed capacity at Montrose House (from 15 permanent
beds to 10 permanent beds and 1 respite bed)?
Key Themes:
• Negative Stance 
o Bed Capacity & Service Reduction Concerns
o Staffing Challenges & Recruitment Barriers
o Impact on Hospital & Community Care
o Ferry & Geographic Isolation Issues
Yes
100%
Are you aware of the current
recruitment challenges across
sectors on the Isle of Arran
(health and social care, retail,
hospitality, tourism)?
3
14
3
0
3
Yes No Not Sure I would
support it with
certain
conditions
(please
specify below)
Other
Do you support the proposed change in bed
capacity at Montrose House (from 15
permanent beds to 10 permanent beds and
1 respite bed)?
123

Page 124

58 | P a g e
• Accepting Change 
• Unclear Stance 
Professionals were mostly negative in their views on the recent reduction in bed numbers, with 52%
expressing a negative response, 26% accepting the change, and 22% providing unclear feedback.
Negative Stance
Bed Capacity & Service Reduction Concerns
Many respondents strongly objected to the reduction in bed numbers at Montrose House, viewing it as
inadequate for Arran’s ageing population and detrimental to care provision. 
“10 beds is just not enough to cover the need for people who have lived on Arran all their lives.”, “Previously,
the island had access to Cooriedoon and 20 beds in Montrose House… the impact of only having 10
permanent beds is significant and life changing.”, “Short sighted given increasing demand across Arran.”,
“Awful – the unit was 20 beds when I worked there… the future for elderly on this island is looking very sad
and desperate.”, “I do not support any of the reductions in services… I cannot support the further
destruction of a vital service.”
Staffing Challenges & Recruitment Barriers
Respondents acknowledge the difficulty in recruiting and retaining staff and offer insights into why local
uptake is low.
“Frustrating but appreciate the ongoing challenges with recruiting staff… a good service cannot be sustained
with agency staff.”, “We need more permanent staff… it would be more sustainable if the staff was made up
from the Arran community.”, “The job description hasn’t been amended in years… the shifts do not suit
anyone with children.”, “If we had spent half a million pounds on a recruitment drive… it would appear more
appealing to the community.”
Impact on Hospital & Community Care
Several responses highlight how reduced bed capacity affects hospital discharge and step-down care,
creating bottlenecks in the wider health system.
“There is a huge need on the island for more availability including step-down services to free up hospital
beds.”, “Arran War Memorial Hospital frequently keeps patients well beyond the time when hospitalisation
is necessary.”, “Reducing bed availability in Montrose House would mean less chance of freeing acute
hospital beds.”
Ferry & Geographic Isolation Issues
The unreliability of ferry services is a recurring concern, especially in relation to off-island care and staff
commuting.
“The ferry situation leaves families cut off from loved ones.”, “It is not practical to have staff living on the
mainland… especially in the winter.”, “The barriers created by ferry services and onward travel… detrimental
to wellbeing.”
Accepting Change 
124

Page 125

59 | P a g e
Those who accepted the proposal appeared to adopt a pragmatic stance, acknowledging that while the
change is not ideal, it reflects the reality of ongoing recruitment challenges.
““If the reduction ensures safe and consistent service delivery… that can only be a good thing.”, “If there
simply aren’t enough staff then changes must be made for the sake of the staff and the residents.”, “Safe
resident care is required… if there isn’t enough staff, cutting bed numbers is the priority.”
Unclear Stance
Respondents categorised as 'unclear' generally did not provide comments that directly answered the
question, and therefore no assumptions were made regarding their viewpoint. 
Q.11 Do you have any views on the proposed admissions policy that would prioritise applicants with
familial ties to Arran for access to Montrose House care home beds?
Key themes:
• Support for Prioritising Local Residents and Family Ties
• Emphasis on Residency Over Familial Ties
• Requests for Clarity or Policy Details
• Preference for Needs-Based Admissions 
Support for Prioritising Local Residents and Family Ties
Most professionals (61%) agree that individuals with familial ties to Arran should be given priority access.
Many of these respondents clarified that this includes those currently living on the island who have family
connections there. They emphasised the importance of maintaining community connections and enabling
family visits.
“I think that would be a welcome policy.”, “Agree that Arran residents should have priority admissions.”, “I
strongly support that if you have lived on Arran and raised a family here, then you should not have to go to the
mainland.”, “It seems sensible to prioritise people with family or friends on the island.”, “I do agree that this
policy would be great”
Emphasis on Residency Over Familial Ties
6, 26%
12, 52%
5, 22%
How do you feel about the recent change in bed capacity at
Montrose House (from 15 permanent beds to 10 permanent beds
and 1 respite bed)?
Accepting
Negative
Unclear
125

Page 126

60 | P a g e
Several responses suggested that length of residence on Arran should be the primary criterion, rather than
familial ties alone. Some expressed concern that the term “familial ties” is too vague.
“Anybody who doesn't have family living in Arran should not be considered. Anyone who has been living in
Arran for a certain (X) number of years… should be considered.”
“In my opinion, only elderly who have resided on the island should have access to beds. 'Familial ties' is not
very specific.”
Requests for Clarity or Policy Details
A few respondents noted that they could not comment meaningfully without seeing the actual admissions
policy or understanding how it would be implemented.
“Can not comment as have not seen the admissions policy.”, “Many people will have familial and
community ties… this policy would need to be tight.”
Preference for Needs-Based Admissions
Three respondents (13%) disagreed with the proposal. They felt that that clinical or personal need should be
the deciding factor, rather than family or residency status.
"Due to the lack of beds, there is not going to be a good way to decide who gets a bed... the best way would
be deciding based on need and requirement.", "It should be on a case-by-case basis. It's difficult to define
one proposition. My mother lived here for 30 years and recently moved off the island... if she were to need a
space in a care home, I would rather it be here.", “Any person living on Arran should have equal access
dependent on needs assessment.”
Q.12 Do you support the proposed admissions policy approach? 
The pie chart shows that 48% (11 people) support the proposed admissions policy approach, while 0% (0
people) oppose it. An additional 39% (9 people) are unsure, 4% (1 person) would support it with certain
conditions, and 9% (2 people) selected "Other”. Of the “Other”, one respondent did not answer the
question, and another stated they “didn’t know enough about it”.
11, 48%
0
9, 39%
1, 4%
2, 9%
Do you support the proposed admissions policy Approach?
yes No Not Sure I would support it with certain conditions (please specify below) Other
126

Page 127

61 | P a g e
Q.13 The HSCP is exploring plans to restart day-care service(s) on Arran utilising a flexible day care
model which would see supports delivered via an out reach service. Would you consider referring your
service users and patients to an out reach day-care service if it were available? 
The chart shows that 74% of respondents (“Definitely”: 56.5% and “Possibly”: 17.4%) would consider
referring to an outreach day care service on Arran, while 8.7% said No and 4.3% said Unlikely, with 13.0%
Not sure. 
Q.14 Is this a service you would be interested in
learning more about?
The below chart shows that 48% of respondents (11
people) expressed no interest in learning more about
the service, while 52% (12 people) want to learn
more about the service. 
Q.15 If yes, please provide your name and contact details (email or phone number)
Respondents were asked to leave contact details if the option of ‘yes’ was chosen for question 14.  There
were 4 email addresses given and 1 phone number.
Q.16 Do you have any concerns about the new or proposed changes?
Key Themes: 
• Core Issues Raised 
o Staffing and Recruitment 
13, 56.5%
4, 17.4%
3, 13%
1,4.3%
2,8.7%
The HSCP is exploring plans to restart day-care service(s) on Arran utilising a
flexible day care model which would see supports delivered via anout reach
service. Would you consider referring your service users and patients to a out
reach day-care servi
Definitely Possibly Not sure Unlikely No
Yes, 12
52%
No, 11
48%
Is this a service you would be
interested in learning more
about?
Yes No
127

Page 128

62 | P a g e
o Concerns About Bed Reduction & Service Erosion
o Impact on Elderly Residents & Families
o Pressure on Hospitals & Wider Services
o Lack of Clarity & Transparency
o Distrust in Decision Making & Governance
• No Concerns / Unclear Responses 
The majority of staff (65%) expressed concerns about the proposed changes. Those who raised concerns
focused on barriers to recruitment, including a lack of affordable housing, inflexible working patterns, and
unreliable ferry services. Feedback also highlighted worries about the impact on elderly residents—such as
isolation, reduced quality of life, and loss of community ties—as well as potential harm to the wider Arran
community. Some respondents felt that reducing capacity is short-sighted and could lead to financial and
emotional hardship for island residents.
Core Issues Raised
Staffing and Recruitment 
Respondents noted concerns around the following: 
• Difficulty attracting staff to Arran due to its remote location and limited housing options.
• Accommodation shortages are a major barrier to recruiting and retaining healthcare workers.
• Ferry disruptions (e.g., sailings mainly to Troon) make it harder for mainland staff to support island
services.
• Loss of bank staff 
“I am concerned about the staffing situation… especially around accommodation for healthcare workers.”,
“There needs to be a multi-agency input to improve the whole situation.”, “I'm worried about losing my job.”,
“Bank staff used to come from the mainland… ferry situation makes this more difficult.”
Concerns About Bed Reduction & Service Erosion
Respondents expressed strong concern about the reduction in bed numbers and the broader impact on
care provision and the island’s infrastructure.
“I am extremely concerned about the reduction in provision.”, “If we go down to 10 beds… less profit =
unfinancially viable and we will close.”, “I firmly believe that reducing overall capacity at Montrose is
having negative impacts.”, “Short sighted given increasing demand across Arran.”
Impact on Elderly Residents & Families
Several responses highlighted the emotional and practical consequences for elderly residents and their
families, especially regarding off-island care.
“Concerned about elderly being separated from friends and families.”, “If Montrose House were to
close… impact on residents’ health and behaviour would be profound.”, “Concerned for any
remaining elderly family on the island needing care.”, “Couples being separated… detrimental to
those people.”, “The island will suffer hugely without Montrose House.”
Pressure on Hospitals & Wider Services
Respondents noted that reduced care home capacity would increasing pressure on hospitals and other
health services locally.
128

Page 129

63 | P a g e
“Arran War Memorial Hospital will suffer… so will Crosshouse.”, “There are already patients in both
hospitals who are from Arran but can’t go home.”, “Lack of options for day services / care at home /
long-term care puts strain on informal carers and hospital staff.”
Lack of Clarity & Transparency
Some respondents felt the consultation lacked clear information and specifics, making it difficult to
understand the practical implications.
“The description of the plans have given no specifics — ‘woolly’ wording.”, “This consultation will stir a lot of
emotion and possibly a lot of ideas.”
Distrust in Decision Making & Governance
A few responses expressed frustration with mainland decision-makers and scepticism about the
consultation’s impact.
“Perfect example of mainland mismanagement.”, “HSCP is not working and does not work.”, “Not
naive enough to think anything written here will make any difference.”, “Destroying NHS, destroying
social services, destroying local community.”
No Concerns / Unclear Responses 
A small number of respondents,21%, explicitly stated they had no concerns or felt the issue had been long
overdue for review. 
“It’s something that should have been addressed a long time ago.”
While the remaining 13% have been categorised as 'unclear', having not answered the question.
Q.17 Would you like to be involved in Staff Montrose House activities and future engagement
sessions? 
Q.18 If yes, please provide your name and contact details (email or phone number)
Respondents were asked to leave contact details if the option of ‘yes’ was chosen for question 17.  There
were 4 email addresses given and 2 phone numbers.
No, 11, 48%
Yes, 12, 52%
Would you like to be involved in Staff Montrose
House activities and future engagement sessions?
129

Page 130

64 | P a g e
Q.19 How would you like to be kept informed about future updates to Montrose House services?
The most preferred method is Email (11 respondents), followed by Staff Meetings (9 respondents) and social
media (6 respondents). Community Meetings were chosen by 4 individuals, while Printed Newsletters
received only 1 response. Phone and Other were not selected by any participants. 
Q. 20 Any further comments? 
47.8% (11) of all respondents chose to add further comments to this open-ended question.
Key Themes:
• Housing & Accommodation Concerns
• Staffing & Recruitment Challenges
• Shift Patterns & Flexibility
• Community Engagement  
• Service Provision & Capacity
• Survey & Feedback Issues
• Staff Dedication & Morale 
Responses from professionals suggest that staff are committed to delivering quality care, but barriers are
undermining recruitment, retention, and service delivery. Addressing these issues through flexible working,
better housing support, improved visibility of roles, and community engagement could provide a
mechanism with which to achieve the full potential of staff and facilities. 
Housing & Accommodation Concerns
Feedback suggests concerns around housing and accommodation, particularly in relation to recruitment.
Affordable housing options for rented and staff accommodation need to be explored to support workforce
growth. Professionals feel that the cost of living on Arran, compared to wages, is making relocation
challenging for potential staff. Professionals also feel that the availability of care at home services must be
increased to meet the needs of geographically dispersed communities. 
The current premises for the District Nurses team are unsuitable and relocating them to Montrose House
has been suggested as a potential solution. 
“As someone who only moved to Arran in the past 3 years I do understand the challenges around housing on
the island… Affordable housing (including rented properties or staff accommodation) should be further
explored to support people moving to Arran for jobs.”, “Due to the general cost of living versus wages for jobs
11
0 1
6
4
9
0
Email Phone Printed
Newsletter
Social Media Community
Meetings
Staff Meetings Other
How would you like to be kept informed about future updates to
Montrose House services?
130

Page 131

65 | P a g e
such as care, moving is not always an option.”, “There needs to be more visibility locally on recruitment and
vacancies for Montrose House.” 
Staffing & Recruitment Challenges
Professionals recognise that staff shortages are significantly affecting service delivery and capacity. They
see a clear need for more carers to be based on the Island.  They also suggest that staffing issues at
Montrose House may be discouraging local people from seeking employment there.  They wish to see a drive
to recruit volunteers, as well as improved visibility of recruitment efforts and advertised vacancies. 
Cleaning staff shortages are particularly acute, leading to physical and mental strain on the remaining lone
cleaning staff. 
“We need more Arran-based carers and we need to engage with the community to find out the barriers as to
why we don't have more Arran-based staff.”, “I understand the need for staff and its struggles… possibly a
drive for attempting to get more volunteering people in.” 
Shift Patterns & Flexibility
Professionals suggest the current 12-hour shift patterns may not be suitable for the local workforce.
Alternatives such as job sharing, shorter shifts, and school-time shifts have been suggested as shift
schedules are seen as a barrier for those with other responsibilities.  Introducing part-time options
(suggested 9am to 2 or 3 pm) could help attract more staff. 
“I wonder if the staffing rotas could change to allow part-time working… a working shift from 9am–2/3pm and
evening shift where a person with a family could start after the other family member returns from work.”, 
“Flexibility in the working patterns may ease the challenges of getting those living on Arran to consider
working for the council at Montrose.”,
“The rigid shift patterns are off-putting to some who cannot commit due to other responsibilities.”,
“Allowing for job sharing/shorter shifts/school shift times would support more of our local working-age
people into post.” 
Community Engagement  
Engaging with the community is essential to better understand barriers to employment. Community
discussions could help generate new ideas and approaches.  
“Maybe a discussion in the community could lead to new ideas and forward thinking.”
“We need to engage with the community to find out the barriers.” 
Service Provision & Capacity
Additional comments note a desire to avoid reducing services, with a preference for improving housing and
scheduling arrangements instead. It was noted that Montrose House is currently underutilised despite being
a purpose-built facility with ample space capacity. 
Expanding day services is seen as a way to reduce applications for permanent care, and a hybrid model that
links day services to community resources is viewed positively.
“Montrose House has plenty of capacity in a very pleasant purpose-built building.”
“I think the building not being used to its full capacity is a shame.” 
131

Page 132

66 | P a g e
Survey & Feedback Issues
Concerns about the design of the staff survey were noted (e.g. the inability to select multiple dependent
types). The survey was also perceived as ineffective and unable to reflect the efforts and experiences of
staff. 
“This survey only allows you to choose one option: I would have spouse, child and dependents however I
can't pick all these choices so the data collected will be inaccurate.”
“What an utterly dreadful and useless survey. What a pointless exercise this is.” 
Staff Dedication & Morale
Comments noted that despite challenges, staff remain committed to providing high-quality care to
residents, though there is need for appropriate support. 
“The staff at Montrose House are passionate about the care of residents. We would all like to see Montrose
full and have a vibrant community that engages our residents.”
“Arran staff are to be commended for their efforts, not abandoned by the so-called Partnership.”
Montrose House Consultation – Letter Summaries
Four letters were received during the consultation exercise regarding the proposed changes at Montrose
House. These were submitted by the Arran Community Council, Arran Council for Voluntary Services, and
two members of the local community. The content of this correspondence is collectively summarised
below.
Future of the Unit: Montrose House was described as a very important part of island life, and concern was
expressed that its significance has been underestimated. Reference was made to the Unit never having
been used to its full capacity, despite being purpose-built at a cost of over £6 million. There was concern
that reducing bed numbers could lead to closure, and a view was shared that with appropriate planning and
organisation, the Unit could be viable.
Demographic: It was noted that the ageing demographic on the island is widely recognised. One contributor
stated that residential and day care services should be increased rather than reduced. One individual
expressed personal concern about the impact of the proposal on both the community and their own future
care.
Impact on Residents and Families: Concerns were raised about island residents, many of whom have lived
on Arran for most or all of their lives, potentially being placed in care homes on the mainland. It was
suggested that families and friends would face difficulties visiting residents relocated to the mainland due
to unreliable ferry services and the cost of transport. One submission described this situation as resulting in
elderly residents being “sentenced to a very lonely old age.” Another questioned compliance with Article 8
of the European Convention of Human Rights (the right to respect for family and private life) and called for
an assessment to be undertaken. It was further requested that Mental Health Impact Assessments are
undertaken for all family members who are currently affected by geographic separation from their loved
ones.
Staffing Issues: Feedback on staffing highlighted two perspectives: one acknowledged that recruitment and
retention challenges are long-standing, while another questioned the effectiveness of recruitment efforts. It
was suggested that a wider local workforce may become available if shift patterns were adjusted to better
align with island transport options. A proposal was also made to revise 12-hour shifts to shorter, more
flexible arrangements to facilitate employment opportunities for younger and local women. One submission
132

Page 133

67 | P a g e
stated that Council management had shown a lack of understanding of island-specific issues, contributing
to a poor working environment. The phrase “This intransigence caused the loss of many local care staff and
left a toxic atmosphere” was used.
A request was also made for job fairs or similar events to be held in island village centres.
Housing: While one contributor noted that accommodation is available for staff working at the Unit, others
identified the lack of affordable housing as a barrier to recruitment. Concern was expressed that planning
policies are enabling the development of larger, more expensive properties, which may be contributing to
rising house prices and limiting opportunities for younger residents to purchase homes. Support was
expressed for the affordable housing initiative, and a suggestion was made to review the housing points
[Housing Allocation Policy] to reflect current employment contracts, specifically, the understanding that 32-
hour contracts are required to secure maximum allocation points, while current contracts are for 30 hours.
Workforce Development: It was suggested that promoting education and training opportunities, such as
Skills for Work courses leading to SVQ qualifications in Health and Social Care, could support future
staffing. Reference was made to Argyll College, part of the University of the Highlands and Islands, as a
provider, currently located on the island’s high school campus.
Funding: One contributor called for more information on how the costs around Montrose House were
broken down. Several budget funding options were proposed. These included using council tax revenue
from second-home owners to support local care services, introducing signing-on and loyalty bonuses
(similar to London weighting), and establishing a fund, charity, or lottery to address financial challenges. It
was also suggested that the Scottish Government be approached for additional funding, noting that
previous funding arrangements were based on the island having a ferry commute of less than one hour, no
longer the case due to the relocation of services to Troon.
Day and Respite Care: The value of day care, respite care, and home care services was highlighted. These
services were seen as important in enabling families to continue caring for relatives at home. Concern was
expressed that closure of the Unit could negatively affect day care provision. It was stated that wellbeing
cafés should not be relied upon to provide day care, as they are run by volunteers and serve a different client
group.
Community Engagement and Process: A request was made for a further community engagement session
to be held before any decisions are finalised. There was also a request for more data to be shared regarding
the factors influencing the proposal. Reference was made to the Scottish Government’s Island
Communities Impact Assessment guidance, and a specific question was raised: “Does your proposal take
into consideration the current demographic structure of the islands and the challenges faced by
populations that might have a greater percentage of older people than other areas?” Disappointment was
expressed at the lack of input from Council representatives or Councillors.
Immediately advertise care roles more visibly, working in partnership with the Island Plan Group, the Arran
Locality Partnership and Arran Skills Group on Arran-specific campaigns modelled on the success seen in
childcare recruitment.  
133

Page 134

68 | P a g e
Appendices 
Letter 1
Please accept these comments as very strongly held opinions & consider them sincerely.  I hope to be
able to express them at the meeting, but know that it will be very well attended & I many not get the
opportunity. 
And yes! I do know what I am talking about, 45 yrs as an Occupational Therapist, mainly in Care of the
Elderly in both hospitals and the community.  The last 20 yrs in Inverclyde. 
The age demographic on the island is an issue, everyone knows that.  The need for residential care & day
care should be augmented, not reduced.  This can be paid for by: 
1. The use of the “second home owners” council tax, which should remain on the island to pay for this
service – consider a “signing on” bonus and a “loyalty bonus” (similar to London weighting) This might
address some of the issues – money talks! 
2. A fund/charity or lottery augment finance issues many islanders would support this. 
3. Do not underestimate the value of Day & respite care& home care services.  This can enable families to
continue caring for family members in their own homes, as is often their wish. 
4. I fear for the community + my future care if this short sighted proposal comes to pass. The wheel will
have to be re-invented very shortly. 
5. Do not rely on many of the “well being” cafes to provide day care.  Run by volunteers they have no
responsibility for the health & well being of their participants who generally are not the same client group
who would use health & social services day care. 
Letter 2
To whom it may concern, 
I was asked to write this on behalf of a group of local residents who attended a meeting at Montrose house
on Tuesday 22nd July. 
There was utter disappointment when it was realised there was little to no representation from North
Ayrshire Council or indeed the local representative Mr Charles Currie (as speakers).
The main point of concern was the fact that importance of Montrose House was totally underestimated. We
have heard it all before – low staffing levels, wings closed, inability to attract staff and the limited places
available because of the above. 
The reality of this situation is the fact it is the only care home on the island and the shortage of bedspace has
resulted in people bed blocking the hospital for months, sometimes years. 
Resident have sometimes been forces into care homes on the mainland (over 20), namely in North and
South Ayrshire areas. These people have been sentences to a very lonely old age. Many have grown up or
lived for many years on the island and surely it would be beneficial for them to be around people they have
known for most of their lives. Instead they are mostly out of reach for family and friends to visit because as
you well know the boat is at best unreliable and of course transport is prohibitive.
134

Page 135

69 | P a g e
The problem could be solved with a little thought, namely changing 12 hour shifts to a more flexible
schedule would permit younger and local women to work in Montrose House. There is accommodation for
staff to live in while working, therefore workers could come from the mainland. 
The availability of Glenartney Hotel and the old lighthouse home in Lamlash were supposed to be for staff.
There is also the empty wing/s all of which could attract experienced workers from the mainland. What is
done to our elderly is cruel and very neglectful and for those staying in hospital it is worse. For many elderly
they do not have family that can visit on the mainland and rely on friends for companionship (from Arran). I
was told by one lady today she would rather die than go to live among strangers on the mainland (a shared
sentiment with many). 
Montrose House could be viable again, the old Montrose House was a happy, warm place where people
knew each other. It would only take a little bit of thought and decent organisation to turn the situation
around. 
The Government was lyrical about social care etc. They do not produce the required results.. and with some
decent planning, money could be saved in the long term. So much rhetoric… so little action. 
Letter 3
Response to Proposals Reducing Arran Care Home Capacity and Impact on Island Community
In a collective community voice capacity, we have been asked to write on behalf of a number of local
contacts and organisations. They are deeply concerned by the ongoing reduction in care home capacity on
the Isle of Arran and the significant negative impacts these changes are already having on residents,
families, and the wider community. We urge the Partnership to reconsider the direction of these changes
and to recognise the pressing need for sustainable, high-quality, local care provision on the island.
Over recent years, Arran has witnessed a dramatic decline in local residential care capacity: Cooriedoon
was a 27-bed unit, was closed in January 2022 while still housing 16 residents. Reports suggest admissions
may have been scaled back prior to this due to safety concerns. Montrose House our current 30-bed unit,
saw its permanent care bed capacity reduced from 20 to 15 in December 2023. If the proposal is progressed
it means that available residential care capacity on the island has fallen from 57 beds to just 10 permanent
and 1 respite bed in under three years. This raises a serious question:
Community needs obviously supported the case for investment of public funds to provide a 30 bed unit.
Despite obvious demand this has never been fully delivered. Would a 10-bed unit be viewed as a
sustainable long-term solution for an island community with a high proportion of older residents?
Since 2020/2021, 29 admissions have been recorded to Montrose House. However, we now understand
there are 23 Arran residents placed in care homes on the mainland, many of whom would otherwise have
preferred to remain closer to home. Again this raises two immediate concerns:
What is the total number of care home admissions from Arran overall within this period, and how many of
those residents have close family or carers still living on the island?
And; How are human rights implications being accounted for, particularly under Article 8 of the European
Convention on Human Rights, which guarantees the right to respect for private and family life? The ferry
dependency, mobility issues among elderly family members, and frequent transport disruptions present
significant barriers to maintaining familial relationships, effectively severing regular contact for many.
135

Page 136

70 | P a g e
We fully appreciate the pressures and acknowledge the high annual cost of placements at Montrose House.
While this differential is understandably a concern for HSCP resource allocation, residents would be keen to
know the breakdown of this cost?
Is the cost artificially inflated due to high agency staffing levels, and what would the cost be with a full
complement of locally recruited staff?
Again, we appreciate that currently, the over-reliance on agency staf is both financially unsustainable,
widely recognised as detrimental to continuity and quality of care and a major contributing factor to cost
escalation.
Despite repeated statements about the difficulty in recruiting, there appears to be no visible evidence of
proactive recruitment advertising for Montrose House or other care roles on Arran locally:
A search on MyJobScotland for "Arran" or "Isle of Arran" produced returns no relevant results. Job postings
require searching by “Brodick,” a detail unlikely to be known or used by external applicants. From searches
it seems there are currently no positions advertised for Montrose House specifically.
In contrast, the Arran Skills Group’s recent campaign around childminding recruitment, using a localised
and targeted promotional approach, has been notably successful—we would be keen to support and to
maximise these approaches which has to date yielded a 66% increase in child carers. This shows that
community-rooted, visible campaigns can work.
30-hour contracts restrict those applicants who may be seeking social housing as the local letting initiative
offers more points for key workers, however the contract must be a minimum of 32 hours. Including HSCP
managers in the Arran Skills meetings and Housing Task force group would allow for more creative out of the
box thinking to enable the local health and care workforce to thrive.
The declaration of the Stronach Day Centre and additional wing/s as surplus to requirements, only shortly
after Montrose House celebrated its 10-year anniversary as a flagship care facility, sends a disheartening
message to residents and staff.
Additionally in line with the Scottish Government’s Public Sector Reform Strategy, services should be:
• Person-centred and community-rooted
• Co-produced and delivered in partnership with communities
• Preventative, accessible, and equitable  
What Arran is currently witnessing is the opposite: a reduction in proximity and access to public services, a
fragmentation of family and community networks, and a disempowerment of island residents from shaping
care options that are appropriate to their context.
We call upon the HSCP to take the following steps:
Publish a breakdown of Montrose House operating costs, with a strategy to reduce costs via sustainable,
local recruitment instead of agency dependency.
Immediately advertise care roles more visibly, working in partnership with the Island Plan Group, the Arran
Locality Partnership and Arran Skills Group on Arran-specific campaigns modelled on the success seen in
childcare recruitment.
136

Page 137

71 | P a g e
Assess the human rights impact (under Article 8) of of-island placements and prioritise local options
wherever feasible.
Undertake a Mental Health Impact Assessment for family members currently affected by geographic
separation from loved ones.
Reaffirm a long-term strategy for sustainable, high-quality care on Arran—one which values and preserves
community integrity.
Arran is a close-knit island with quite unique challenges—but also with unique opportunities. The
community wants to support its own and assist in the solution to this challenge, the question is whether
public services will support the community in doing so. We urge the Health and Social Care Partnership to
work with local residents, families, and services to build a sustainable care model that respects human
dignity, strengthens family bonds, and ensures that no one has to face the end of life isolated and far from
home.
We are open to meeting with the Partnership to discuss our concerns and offer input into constructive
solutions.
Yours sincerely,
Bill Calderwood
Chair of Arran Community and Voluntary Service
(on behalf of concerned contacts and local stakeholders on Arran)
Letter 4
Dear Directors and management of NAC IJB
We are writing to you to declare our alarm and dismay over the possibility of North Ayrshire Council reducing
the number of rooms available to Arran residents in need of care in Montrose House.
Montrose House has been a very important part of Arran life for decades and innumerable numbers of Arran
residents happily spent the last years of their lives there. To have that taken away and be replaced by
transportation to inaccessible mainland care homes is alarming. We have many people on the island that
have spent their entire lives here and the decision to send these people off island in the final years of their
lives beggars belief. We do not think it is fully appreciated as to how difficult it will be for Arran families and
friends to visit any care home residents that have been moved to mainland care homes, particularly now
that our ferries are using Troon as a home port for the foreseeable future. We question how families on the
mainland would react to travelling to visit family if their relations were deployed on Arran.
The new build at Montrose House must be kept and used to the potential it was built for and ACC will offer
our support in any way possible in order to ensure that that happens. The suggestion that a purpose built,
publicly funded building created at a cost of plus £6 million, is to be slowly downgraded is unacceptable and
would lead to the probable closing of the facility which has never been used to its full capacity in the first
instance. At that time, the demand was clearly identified and public funds invested to satisfy that need.
Closure of Montrose House could also have a knock- on effect to the Daycare provision on Arran which has
been very effective in the past.
We recognise that costs for running care homes have increased whilst funding from central government to
Local Government and Health Boards has decreased since 2010. With regard to the funding of Montrose
House, we understand that the use of mainland based and agency staff have caused running costs to
137

Page 138

72 | P a g e
increase substantially and it is thought that that is one of the areas where savings can be made. The NAIHB
has an obligation to look at those costs regularly but we would suggest that there could be an untapped
local workforce available, as there has been in the past. However, one has to look at why there are not
enough local staff working there anymore and would suggest enquiries are made into that question. One
reason we know of for losing local care staff at Montrose House, since the new build was opened, was NAC
management’s intransigence, and lack of understanding, and that enforcing Arran shift patterns and timings
to align with those on the mainland was problematic, if not impossible for staff given the lack of public
transport on the island. This intransigence caused the loss of many local care staff and left a toxic
atmosphere. Any hope of employing Arran residents as care staff at Montrose House must recognise that
staff shifts must allow for Arran bus times and not be dictated by the convenience of alignment with care
homes elsewhere that have the luxury of excellent public transport systems.
ACC also recognise that lack of affordable housing for local people is a long-realised problem that is now
becoming more apparent. There are many reasons for this which should also be re-appraised. Should NAC
re-assess a planning policy which seems to be allowing and encouraging increasingly bigger and more
expensive properties to be built on the island when it is apparent that by doing so the effect is to increase
property prices on Arran and thus prevent Arran’s young people from owning their own homes.
ACC are supporting the affordable housing initiative and perhaps this needs to be promoted with a review of
the points allocations changed to recognise the current contracts at 30 hours when employees need to work
32 hours to maximise the points.
The future of staffing at Montrose House will, to some extent, rely on local young people educated at Arran
High School. AHS has on its campus Argyll College, a branch of the University of the Highlands & Islands
(UHI). The college has run Skills for Work courses within AHS and some of these courses available for pupils
can lead onto SVQ qualifications in Health & Social Care once pupils are in employment. This is perhaps
something to be considered and encouraged in the long term.
ACC is concerned that that reducing bed numbers in Montrose House will eventually lead to its closure.
ACC think that, if possible, approaches should be made to the Scottish Government for extra funding for
Arran as previous additional island funding for Arran, via NAC etc, was predicated on Arran having its home
port less than one hour away. This is no longer the case due to the unnecessarily large ferries being
deployed to Arran by the Scottish Government, forcing a move to Troon in South Ayrshire, thus increasing
costs for all concerned.
ACC feels that a concerted effort to locate local care staff could create dividends and would request that job
fairs, or similar, in Arran village centres could be a first step in resolving an extremely unpopular and difficult
situation that the island finds itself in, primarily through no fault of its own.
Before a decision can be made for the future of this key facility on Arran we ask if you will support a further
community engagement session and provide that session with more data on factors that are influencing the
decision. We also ask that you consider how your process complies with Scottish Governments guidelines
for community needs assessments (https://www.gov.scot/publications/island-communities-impact-
assessments-guidance-toolkit-2 /documents/ ) particularly the question:-
Does your proposal take into consideration the current demographic structure of the islands and the
challenges faced by populations that might have a greater percentage of older people than other
areas?
138

Page 139

73 | P a g e
Arran Community Council have every confidence in the local management and staff and we are very willing
to assist in any way to ensure that the needs of the community can be provided as effectively as possible
and the future of this facility is secured at required levels.
Regards,
Arran Community Council members.
139

Page 140

74 | P a g e
Drop In Event Flyer 
140

Page 141

75 | P a g e
Community Drop In Event, Stronach Room, Montrose House (22
July 25)
The session was organised as a drop-in event to facilitate informal discussion and feedback. However,
prior conversations within the community led to the majority of attendees arriving at the scheduled
start time, resulting in attendance numbers exceeding the venue’s capacity. This created a challenging
environment for both attendees and staff. Estimated attendance was between 120–150 individuals.
At the beginning of the session, attendees were given a verbal overview of the proposal, including the
background and rationale. The venue layout (the room is a long space) and the absence of a
microphone or hearing loop system as the plan had been for smaller round-table discussions meant
that some attendees had difficulty hearing.  Staff were able to respond to several questions from the
full group, before the session became noisy, with multiple individuals speaking at once in an effort to
express their views and some attendees voicing strong opposition to the proposal
With support from the Community Councillor, the large group was then divided into four smaller
discussion areas, each facilitated by a staff member. This allowed for more focused and constructive
dialogue, although some individuals remained vocal, making it difficult at times to address specific
concerns in detail.
Feedback was collected during the session, and attendees were encouraged to complete the paper
survey to ensure their views were captured more comprehensively.
Break Out Meeting Notes:
Venue and Meeting Arrangements
• Venue space and meeting facilities (e.g. loop facilities, microphones) and setup wholly inadequate
for the meeting. 
o The speakers couldn’t be heard and/or seen
 It was unclear who they were or what their roles were either.
o Many examples of people not attending or leaving the meeting early due to not being able to
hear speakers or contribute.
• Pre-meeting advertising was completely inadequate. 
o Lack of widespread advertising in libraries, public spaces etc.
o No mention in The Banner
o Reliance on a social media post - ineffective when a large number of residents do not use
social media
• No Pre-meeting information (e.g. timescales, the consultation process, facts and figures
underpinning the decision making) provided to enable a meaningful consultation.
• Concern that this was no more than a false consultation. The comment from a NAC representative
speaker about being “surprise at attendance numbers”, the perceived deliberate attempt to poorly
advertise, not provide any meaningful information to enable an informed discussion and the lack of
NAC representation at a senior level, led to concerns around the bed reduction being a ‘done deal’
and that no one from NAC is actually interested in a meaningful consultation, instead treating the
meeting as a tick box exercise.
o The need for a meaningful and wide-reaching and inclusive consultation was deemed
essential
• Many attendees were unclear about what the actual purpose of the meeting was for!
141

Page 142

76 | P a g e
• The vague proposal around hybrid day-care model, with no information provided, was seen as a
measure to purely distract from the issue around reducing the number of beds.
o How will the daycare model be funded and staffed?
• Concern was raised around the use of breakout groups (initiated to mitigate the inappropriate
meeting arrangements) and the potential for filtration management, with reduced impact, where
NAC decision makers were not present to hear the strength of views directly. 
• Concern was raised that the NAC decision makers at the appropriate level were not present and do
not understand the unique challenges Arran faces. 
• “Okay as an early chat but in no way a consultation!”
Consultation Information
o What is actually being proposed? On what basis? What alternatives have been considered? 
o The importance of having access to the facts and figures underpinning the case was deemed
essential for trust in a fair process.
o What is the timescale for implementing the proposed plan?
o Who is managing the list for unmet need for Arran?
o Why were views and ideas not sought earlier to look for solutions before bed reductions were
proposed?
o Where will the money savings go from the reduced number of beds? Will this be used to ‘beef up’
day care and home care services in Arran?
o What are NAC’s (and the NHS’s) statutory obligations regarding care provision for the island? Are
these being met?
o Moving from 3 to 1 care homes was viewed with concern, but the expectation was still that, with the
building of Montrose House, care would still be provided on Arran for Arran residents. Little regard is
being given to the isolation from friends and family due to the location of alternative mainland care
homes, difficulty of travel (involving the challenging ferry service) and the emotional toll this will
have on residents and their families if placed in mainland homes. 
o Infringement of human rights?
o The additional impact of the difficulty associated with ferry travel appeared to have been
ignored with the plans, especially with the use of Troon. 
o Difficulty in defining who would constitute ‘Local’, and the tension this could   cause within the
island community.
o Rather than attracting new staff, reducing beds will reduce the attractiveness of the role, training
opportunities and make recruitment and retention harder, ultimately leading to Montrose House
closing permanently. Concern that this was NAC’s intention in the long term.
o Arran needs a bespoke solution based on its unique situation and challenges, with facts and
figures collected to support this.
o Demonstrate case for additional money from central government
o Appropriate consideration of the impact of the ferry difficulties too.
o Arran having the highest elderly population in Scotland
o Can we learn from other islands?
• Need to look outside the standard boxes, ways of working and ‘siloed’ budgets to come up with a
solution that is right for Arran 
• What happened to ‘The Arran Budget’? – pre covid, could this be a model moving forwards?
• Recognition that on an island everything is interconnected, if day care services are reduced, then
there is a greater requirement for support for home, care home or hospital places, so addressing
issues without the whole picture is counterproductive.
142

Page 143

77 | P a g e
o Arran has an overreliance on the third sector and a solution needs to reduce this reliance
and provide a sustainable solution moving forwards.
• Lack of understanding about the model of health and social care provision and their associated
budgets. 
o How can these be better and more efficiently used moving forwards? 
o How can NAC look to reduce the number of beds when patients are stuck in hospital due to
lack of care places and packages being available. 
• Is NAC’s proposal still going to the next Integrated Board Meeting? - concern that this should be
withdrawn to enable proper consultation
• How will information be captured and provided back following the meeting. 
• A proper consultation is required moving forwards:
o Accurate information available in advance to enable meaningful discussion
 Right people, right time, right place
o Wider, timely advertising 
o Making the information and process for proving views much more accessible
o Use of existing island networks and groups to disseminate information and capture views
Consultation Survey:
o Inadequate
o Limited reach due to restricted social media channels being used to advertise this
o Need: 
o Actual information! – fact sheet outlining proposals, alternatives, decision making process,
timescales, opportunity for engagement. Who to raise concerns too, template letter to
support people raising their concerns/objections
o Survey that is able to gather the depth and breadth of information necessary to properly
consult islanders
o Gather right information from the right people to demonstrate ‘local’ need, and ‘actual cost
(rather than offset to the NHS for bed blocking), to demonstrate need, and to secure
additional funding from e.g. central government
Recruitment and Retention of Staff
• Recognition that ‘agency’ staffing is not a long-term solution to safe staffing at Montrose House and
the need for a more stable and sustainable staffing solutions moving forwards.
• Money: need to invest in staff to attract new staff:
o explore possibility of an Arran allowance to attract mainland workers
o look at pay based on cost of living
• Housing: 
o looking at prioritizing nurses/carers for social housing
o provide ‘Auchrannie-style’ accommodation for nurses/carer living fulltime on Arran
o expand ‘Glenartney- style’ accommodation for mainland workers
• Advertising: Look at where and how vacancies are advertised and overhaul the recruitment
process.
• New ways of working: 
o conduct consultation with current, past and future care workers/nurses to understand their
needs (wages, full time part time, job shares, dynamic working across community and
hospital/Montrose House) and the barriers that have driven them from or prevent them
going into the care profession.
143

Page 144

78 | P a g e
• Island Career Pathways: Establish career pathways for workers
 Opportunity for engagement with Arran High School for ‘wider’ volunteering
opportunities and work experience to promote nursing or care as a career. 
• Potential for Care qualification equivalent to their barista training
qualification as a wider activity.
Other:
• Recognition of the Saturation of the workforce 
• Need to look at the workforce as a whole (NHS and NAC) and how it can be best used to support the
needs of the population on Arran.
• Recognition of the age distribution of the population of Arran. 
o Concern that by not investing in care staff and reducing available care:
  the island may depopulate 
 the age-dynamic of the island will be artificially ‘engineered’ to cut costs, servicing
only a younger population
Word/phrases captured:
Unacceptable
Inhumane
Cruel
Shortsighted
Loneliness
Isolation
Quality of life
Friends
Family 
144

Page 145

2 | P a g e
Appendix 3: Big Blue Dog Recruitment Report 
145

Page 146

Version: 6.0
1
North Ayrshire Council
Equality & Children’s Rights Impact
Assessment 
(Full Form) 
Introduction 
This form will assist in carrying out an Equality Impact Assessment and where
appropriate, Socio-Economic, Children’s Rights, Island Communities and
Consumer Duty Impacts of new, revised and existing policies and practices.
Guidance on how to complete assessments is given in the Council’s Equality and
Children’s Rights Impact Assessment Toolkit. 
The form is mandatory and must be published on the Council website once the
policy or practice has been approved.
Section 1: General Details
1.1 Directorate/Service HSCP: 
Section: Health and Community Care
1.2  Name of Policy, Practice of Proposal being assessed:
Arran Integrated Island Services
Is it New ☐ Existing (being reviewed): ☒ Budget Proposal: ☐
Please insert Budget Reference number (if applicable) Click or tap here to enter
text.
1.3  List of participants in the assessment 
Ailsa Weir, HSCP Senior Manager, Integrated Island Services
Michelle Sutherland, HSCP Senior Manager, Primary care and Communities,
Andrew Hale, NAC Team Manager, Policy & Performance
Ruth Wilson, NAC Team manager (Litigation)
Amy Mullen, NAC Equalities Inclusion Officer
1.4  Manager responsible for the impact assessment 
Name: Kery Logan 
146

Page 147

Version: 6.0
2
Designation: Head of Health & Community Care
1.5  Timetable (should be started during the development phase of the proposal)
Date Assessment Started: March 2025
Interim Review Date: 09 June 2025 HSCP Finance Working Group, 19 June
2025 IJB meeting, 04 July 2025 and 30 July 2025 review with NAC Corporate
leads. 
Final sign off by Head of Service at the end of the form.
Section 2 – Aims and Relevance 
2.1  What is the purpose of the policy practice or proposal?
Montrose House Care home is on the Isle of Arran and is undertaking a review
due to the following: a) Older People Day Service – the traditional day service
provision closed due to infection control requirements during the Covid 19
pandemic and has not re-opened. A service review, alongside stakeholder
engagement, is taking place to identify a day service model which will best
meet the needs of future service users, and their carers. Proposal to explore a 
hybrid day-case model, which will be provided in-house and community-based
working alongside the activity coordinator b) Montrose House continues to face
significant operational challenges related to staffing levels, due to the limited
availability of social care trained staff on the island.  As a result of these staffing
challenges there has been a  reliance on agency workers, to ensure safe
staffing levels within the home. Unfortunately, at times agency staff cover can
be irregular, which affects the continuity and quality of care delivery. As a result
the Montrose House Care Home budget has been overspent over the last 2
financial years.  At the current time there are 12 residents, and the option
appraisal proposal recommends a reduction from 15 permanent beds to 10
permanent care beds and 1 respite bed. This will improve service resilience,
safety and quality, by having a sustainable service with a staffing model which
does not rely on agency staff.  If achieved, this will result in improved safe care
delivery and the overspend being reduced significantly. c) The review is also
proposing the development of an admissions policy to prioritise those with
familial ties on the island to access the Montrose House beds.    
147

Page 148

Version: 6.0
3
Section 3 – Equality and Diversity
3.1  What evidence were you able to access about the relevant needs of protected
groups as outlined in section 3.3 below (Please include your sources – links to
equality providers and evidence can be found in both the toolkit and the
Promoting Equality Page on Connects).
There has been the collection and analysis of a wide range of data sources:
1. Arran Locality Profile 2017 [http://northayrshire.community/wp-
content/uploads/2018/02/Locality-Profile_Arran_Final_Version_Sept2017.pdf]  
2. Arran Integrated Island Service Review - Initial Review 20th July 2020 [2020-
08-17-bm-p24-arran-integrated-island-services-initial-agreement.pdf] 
3. Isle of Arran – Local Island Plan March 2022 [https://www.north-
ayrshire.gov.uk/Document-library/arran-local-island-plan.pdf] 
4. Scottish Census 2022 [https://www.scotlandscensus.gov.uk/] 
5. Health & Social Care Partnership – Integrated Island Services Management
Information on workforce, workforce recruitment, financial, resident needs,
etc. [internal – not for publication]
The data highlights high life expectancy and low levels of younger people on the
isle of Arran. 34.5% of the population on Arran are 65years +, much higher than
the 20% of Scotland population.
Arran’s Island Plan highlights the lack of affordable housing and low numbers of
working age population that affects availability of staff, who would require to have
social care experience and qualifications, to work at Montrose House. There is a
15% salary uplift available to NHS Band 5 roles and an enhanced rate of pay for
council staff employed at Montrose House, reflecting the higher costs of living on
an island.
HSCP demographics  include the island workforce, recruitment campaigns and
lack of response, financial information, option appraisal information, residents’
health & social care needs, admission rates/availability of beds in Montrose
House. 
3.2  Are there any gaps in your evidence or areas of uncertainty? 
There is currently a data gap about whether existing Montrose House residents
have come from a care experienced background. However, this in not felt to be
materially relevant. This issue can be captured as part of the review and
development of c) a new admissions policy.
3.3  From the list of protected characteristic groups identified in section 2.3 please
identify any potential positive and negative impacts on any of these protected
characteristics?
148

Page 149

Version: 6.0
4
Protected Characteristic  Yes  No  Please Explain (Positive or
Negative or Neutral)
Age - Older people, children
and young people – please
identify which categories will
be affected
☒ ☐ The implementation the proposals
for a) older people day services, b)
Montrose house bed reduction, and
c) Montrose House new admission
policy;  could have a negative
impact on older people. 
34.5% of the population on Arran
are 65years +, much higher than the
20% of Scotland population, so the
likelihood of demand for  a) older
people day services, and b)
Montrose house beds;  could
outweighing resources available. 
It is also likely that the older age
population of the island will grow
over the coming years. 
a) older people day services – it is
the ambition of a new flexible day
service model to offer more places
to older people on Arran, than the
previous traditional daily attendance
model, which offered 12 places
Monday to Friday. This will provide
families with additional respite.
b) Montrose house bed reduction -
the reduction in the number of beds
from the current 12 residents to 10
permanent beds and 1 respite bed,
may lead to future service users
having to be placed in mainland
care homes resulting in increased
travelling for island-based carers/
families. It is recognised that some
family members may also be older
and be affected by long-term
conditions and disabilities.  There is
no requirement for existing
residents to leave the care home.
The review and development of c) a
new admissions policy, will be
informed by stakeholder
149

Page 150

Version: 6.0
5
Protected Characteristic  Yes  No  Please Explain (Positive or
Negative or Neutral)
engagement. It is the ambition that
this will create an approach to
prioritise those with familial ties on
the island and if requested, there
will be the opportunity for service
users to be on a prioritised waiting
list for transfer back to the island
when there is bed availability. 
Disability - Physical and
Learning
☒ ☐ The people admitted to Montrose
House experience higher levels of
age-related frailty than those of a
similar age. 50% of the residents
suffer from dementia, with others
affected by Parkinsons, Multiple
Sclerosis and complex diabetes. 
a) older people day services – it is
the ambition of a new flexible day
service model to offer more places
to older people on Arran, than the
previous traditional daily attendance
model. This will provide families with
additional respite.
b) Montrose house bed reduction -
the reduction in the number of beds
may lead to service users having to
be placed in mainland care homes
resulting in increased travelling for
island-based carers/ families. It is
recognised that some family
members may also be older and be
affected by long-term conditions
and disabilities.
The review and development of c) a
new admissions policy, will be
informed by stakeholder
engagement. It is the ambition that
this will create an approach to
prioritise those with familial ties on
the island and if requested, there
will be the opportunity for service
users to be on a prioritised waiting
150

Page 151

Version: 6.0
6
Protected Characteristic  Yes  No  Please Explain (Positive or
Negative or Neutral)
list for transfer back to the island
when there is bed availability.  
Gender reassignment -
Where a person is living as
the opposite gender to their
birth
☐ ☒ Neutral – gender reassignment
does not affect use of or admission
to; a) older people day services or
b) Montrose House beds.
Pregnancy and Maternity ☐ ☒ Neutral - Montrose House is for
people over 65 years only.
Accessible lounges and toilets are
available for women experiencing
pregnancy or early post birth, when
visiting residents.
Race, ethnicity, colour,
nationality or national
origins (including gypsy/
travellers, refugees and
asylum seekers)
☐ ☒ Neutral – 98.34% of the isle of Arran
population are white.  Race,
ethnicity, colour, nationality or
national origins does not affect use
of or admission to; a) older people
day services or b) Montrose House
beds.
Staff working at Montrose House
have access to cultural sensitivity
and racism training, as required.
Religion or belief (includes
religious and philosophical
beliefs, including no belief)
☐ ☒ Neutral – religion or belief does not
affect use of or admission to a) older
people day services or b) Montrose
House beds.
Staff working at Montrose House
support residents to access spiritual
care, which best meets their needs.
Sex - Women and Men ☐ ☒ There is a slightly higher female
population on the island. There are
Males, 2,207 and  Females, 2,438.
151

Page 152

Version: 6.0
7
Protected Characteristic  Yes  No  Please Explain (Positive or
Negative or Neutral)
Females make up 52% of the island
population.
Arran median male life expectancy
at 81 years is the highest in North
Ayrshire. Females in Arran can
expect to live to over 83 years – 2.5
years above the Scottish average.
This 2% difference in population
and 2 years in life expectancy, does
not have a materially impact on
Montrose House as all residents
have their own on-suite bedrooms
and in the public spaces there are a
range of residents’ areas and toilets
available to offer single sex spaces.
Staff working at Montrose House
support residents to access
activities which best meet their
personal preferences.
Sexual Orientation - Lesbian,
gay and bisexual people
☐ ☒ Neutral – sexual orientation does
not affect use of or admission to a)
older people day services or b)
Montrose House beds.
Marriage and Civil
Partnership - marriage
between same sex couples is
included
☒ ☐ The implementation of the
proposals for a) older people day
services – it is the ambition of a new
flexible day service model to offer
more places to older people on
Arran, than the previous traditional
daily attendance model. This will
provide families with additional
respite.
b) Montrose house bed reduction
could have a negative impact on
those who are married or in a civil
partnership in the event that they or
their spouse cannot be
accommodated in Montrose House.
It is recognised that a person’s
152

Page 153

Version: 6.0
8
Protected Characteristic  Yes  No  Please Explain (Positive or
Negative or Neutral)
spouse or partner may not be able
to visit as frequently. It is recognised
that this may cause anxiety and
distress to both the resident and
family member; and although the
island social work teams will work
with family members to reduce their
isolation e.g. referrals for support
from carers groups, this distress
cannot be fully mitigated against.
The review and development of c) a
new admissions policy, will be
informed by stakeholder
engagement. It is the ambition that
this will create an approach to
prioritise those with familial ties on
the island and if requested, there
will be the opportunity for service
users to be on a prioritised waiting
list for transfer back to the island
when there is bed availability. 
Human Rights  ☒ ☐ The implementation of the
proposals for a) The development of
older people day services should
offer more places than a traditional
day service model and this will
provide spouses, partners and
families with additional respite
opportunities.
b) Montrose house bed reduction
could have a negative impact on the
human rights of older people and
their families if they cannot be
accommodated in Montrose House.
It is recognised that a person’s
spouse, partner and other family
members may not be able to visit as
frequently. 
It is recognised that this may cause
anxiety and distress; and although
153

Page 154

Version: 6.0
9
Protected Characteristic  Yes  No  Please Explain (Positive or
Negative or Neutral)
the island social work teams will
work with family members to reduce
their isolation e.g. referrals for
support from carers groups, all of
this distress cannot be mitigated
against.
The review and development of c) a
new admissions policy, will be
informed by stakeholder
engagement. It is the ambition that
this will create an approach to
prioritise those with familial ties on
the island and if requested, there
will be the opportunity for service
users to be on a prioritised waiting
list for transfer back to the island
when there is bed availability.
Care Experienced - This term
refers to anyone who is
currently in care or has been
for any length of time
regardless of their age and
includes Kinship Care (other
family members); Looked
After at Home (with support
from social work); Residential
Care; Foster Care; Secure
Care; Adoption. 
☐ ☒ Neutral – at the current time there is
no assessment that captures
whether someone has experienced
Kinship Care (other family
members); Looked After at Home
(with support from social work);
Residential Care; Foster Care;
Secure Care; Adoption, earlier in
their life.
These issues do not affect use of or
admission to a) older people day
services or b) Montrose House
beds. As such this issue does not
have a material impact.
This issue can be captured as part
of the review and development of c)
a new admissions policy.
154

Page 155

Version: 6.0
10 
Protected Characteristic  Yes  No  Please Explain (Positive or
Negative or Neutral)
Other - Poverty,
homelessness, ex-offenders,
isolated rural communities,
carers, part-time workers, or
people in a marriage/civil
partnership
☒ ☐ Although 87% of Arran has a gross
household income (£31k), which is
above the North Ayrshire median
(£24K) in almost 9 out of 10 Arran
postcodes (875). It is recognised
that due to the rural nature of the
island, there are higher living costs
and longer travel times. It is also
recognised that the majority of
individuals affected at Montrose
House will be over the age of 65
years and living on retirement
pensions.
In the event that a relative requires
to move off island for residential
care, currently the foot passenger
day return cost is £ 10.20 per adults
and £5.10 per child; subject to
concessions.
There may also be bus/train fares
from ferry to home and ferry to care
home.
It also costs £51.20 to take a car on
a return trip.
There may also be car fuel costs
from ferry to home and ferry to care
home.
The HSCP has no mechanisms
available to reduce or mitigate these
costs, noting the responsibility only
extends to providing care and
support for the individual requiring
access to residential care.
3.4  Describe any consultation or engagement undertaken, including details of the
groups involved and the methods used.
Montrose House Engagement 
Goals of Engagement
155

Page 156

Version: 6.0
11 
The engagement will provide background information and awareness of the
proposals a) older people day services b) Montrose house bed reduction and 
c) a new admissions policy. 
The proposals will highlight the positive changes, such as the re-introduction of
hybrid day-case model, which will be provided in-house and community-based
working alongside the activity coordinator. It will be helpful to get feedback on
this approach, from community views of a workable model.
The engagement will include reasons for the proposals, driven by critical
staffing challenges and focussing on the difficulty in providing safe person-
centred care. This will also highlight the financial pressures created due to the
use of agency staff. 
The engagement event will provide an awareness of the admission processes/
waiting list for beds if assessed as suitable for Montrose House.
What we want to achieve from engagement?
Receiving feedback on the proposals; as well as providing reassurance and
alleviate any concerns the community may have. This information will be fed
back to the NAHSCP senior management team and will be included in the
updated ECRIA and IJB report for submission in August.
Montrose House Engagement drop in Event was held within Montrose House
by the Arran Senior Management team on 22nd July 2025 from 1000-1200.
The audience was the public, residents, families, and visitors. 
The drop-in session will include:
• public, residents, families, and visitors provided with a leaflet/flyer in
Montrose House for the Questionnaire/Online Survey. Survey can be
accessed by a QR code but paper copies available for completion at face-
to-face sessions and uploaded later.
• Prepared, clear concise answers to questions that might be raised to ensure
that all staff participating in the event are collectively sharing the same
information.
The details of the drop-in were emailed to 16 community groups; the details of
which were provided by the Arran Community Voluntary Organisation. These
groups included Brodick and Lamlash Sheltered Housing complexes, Older
People Groups, Lunch Clubs, Community Councils, and patient participation
groups.
Posters about the drop-in session were shared at Montrose House and GP
surgeries.           
Service Users and Partner staff.
The Questionnaire/Online Survey using a QR code was available, with paper
copies available too for completion. Members of the public were provided with
support from variety of HSCP staff.
156

Page 157

Version: 6.0
12 
1. Care at Home & Alert service users - completion supported by Care at
home staff. 
2. District Nursing caseload patients-completion supported by District
Nursing staff.
3. patient participation groups- support from primary care
4. Relevant community groups-Vicki Yuill ACVS providing contact details.
5. Support from engagement team required with preparation of
survey/questionnaire, QR code and analysis/overview of results.
A full summary of the responses to engagement is available on the IJB
webpage.
Montrose House Engagement drop in Event was held within Montrose House
by the Arran Senior Management team on 22nd July 2025.
A public online survey was opened on the 15 July 2025 to 1st August 2025 
and paper copies were also made available. Staff supported people to
complete the paper copies.
A staff online survey was opened on the 25th July to the 1st August 2025.
There were 458 responses to the Residents, Families and Wider Island
Community survey.
 The majority reported having a spouse (36%) and/or wider family
(35%) living locally. 18% said they have children on the island, while 10% (48
respondents) indicated they have no family living on Arran.
 The vast majority of respondents, 82.8% (403 people) do not currently
receive support from health and social care services on the Isle of Arran
 97% of respondents (444 individuals) were aware of the current
recruitment challenges across various sectors of Isle of Arran,
 73.1% of respondents (“Definitely”: 37.3% and “Possibly”: 35.8%)
would consider using an outreach day care service on Arran, while only 3.3%
said No and 5.2% said Unlikely, with 18.3% Unsure.
 97.6% (447) of recipients opposed the recent change in bed capacity at
Montrose House. 1.5% (7) were in favour and 0.9% (4) were unsure if it was
the correct move
 32% (145 people) support the proposed admissions policy approach,
while 23% (105 people) oppose it. An additional 27% (125 people) are unsure,
5% (24 people) would support it with certain conditions, and 13% (59 people)
selected "Other.“ 
157

Page 158

Version: 6.0
13 
Key themes from proposed bed changes:
• Strong Opposition and Emotional Distress
• Primary Concerns About Mainland Relocation 
o Forced Displacement from the island/ Family Separation 
o Personal and Family Impact Stories
• Ferry Service Complications 
o Visiting Challenges
Staffing and Quality of Care Perspectives 
o Understanding of Staffing Challenges 
o Conditional Support for Quality Care 
• Use of Purpose-Built Facility 
o Underuse of Purpose-Built Facility 
• Distrust of Motivations 
o Suspicion of Cost-Cutting 
• Demographic and Demand Considerations 
o Ageing Population Needs 
• Impact on Other Services 
o Pressure on Healthcare System 
There were 23 respondents to the Staff, Professionals and Wider Partners
survey.
96% (22 out of 23 participants), are residents of the Isle of Arran while only
4% (1 participant) is not.
The majority of respondents (61%) did not support the proposed change. 
Four professionals (17%) agreed with the proposal, with only one qualifying
their feedback by stating, "If that's all we can staff, it's all we can staff." 
Questions 3.5 – 3.7 refer to the ‘Three Key needs (or aims) of the Equality
Duty’
3.5  Which aspects of the policy eliminate unlawful discrimination, harassment and
victimisation? 
This proposed changes at Montrose House does not create unlawful
discrimination, harassment and victimisation. The continued provision of care
home beds and the re-instatement of day services for older people, support
older people on the island to remain linked to their families and local
community.
3.6  Which aspects of the policy advance equality of opportunity between people
who share a relevant protected characteristic and those who do not?
158

Page 159

Version: 6.0
14 
This proposed changes at Montrose House does not advance equality of
opportunity between people who share a relevant protected characteristic and
those who do not. 
The continued provision of care home beds and the re-instatement of day
services for older people, support older people on the island to remain linked to
their families and local community who may not have protected characteristics. 
It is recognised that the proposal for b) Montrose house bed reduction, could
have a negative impact older people and their families if they cannot be
accommodated in Montrose House. It is recognised that a person’s spouse,
partner and other family members may not be able to visit as frequently.
3.7  Which aspects of the policy foster good relations between people who share a
protected characteristic and those who do not? (Does it tackle prejudice and
promote a better understanding of equality issues). 
This proposed changes at Montrose House foster good relations between
people who share a protected characteristic and those who do not as the
continued provision of care home beds and the re-instatement of day services
for older people, continues to support older people on the island to remain
linked to their families and members of the local community who may not have
protected characteristics. 
It is recognised that the proposal for b) Montrose house bed reduction, could
have a negative impact older people and their families if they cannot be
accommodated in Montrose House. It is recognised that a person’s spouse,
partner and other family members may not be able to visit as frequently.
3.8  If you have identified any negative impacts of your proposal how will you
mitigate these?
The implementation of the proposals for b) Montrose house bed reduction,
could have a negative impact older people and their families if they cannot be
accommodated in Montrose House. It is recognised that a person’s spouse,
partner and other family members may not be able to visit as frequently. It is
recognised that some family members may also be older or have disabilities.
It is recognised that this may cause anxiety and distress to both the resident
and family members; and although the island social work teams will work with
families to reduce their isolation e.g. referrals for support from carers groups, all
of this distress cannot be mitigated against.
The review and development of c) a new admissions policy, will be informed by
stakeholder engagement. It is the ambition that this will create an approach to
prioritise those with familial ties on the island and if requested, there will be the
opportunity for service users to be on a prioritised waiting list for transfer back
to the island when there is bed availability.
159

Page 160

Version: 6.0
15 
In the event that a relative requires to move off island for residential care,
currently the foot passenger day return cost is £ 10.20 per adults and £5.10 per
child; subject to concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home.
The HSCP has no mechanisms available to reduce or mitigate these costs,
noting the responsibility only extends to providing care and support for the
individual requiring access to residential care.
The development of a) older people day services should offer more places than
a traditional day service model and this will provide spouses, partners and
families with additional respite opportunities. 
3.9  Is the policy or practice intended to promote equality by permitting positive
action or lead to positive outcomes for people based on a protected
characteristic?
The proposals for Montrose House promote positive actions through the
delivery of safe care models, with the appropriate levels of staff who are
suitably qualified. a) The older people day services should offer more places
than a traditional day service model and this will provide spouses, partners and
families with additional respite opportunities. b) The Montrose house bed
reduction will ensure safe staffing levels, improved quality of care and better
outcomes for residents at Montrose House.  
160

Page 161

Version: 6.0
16 
Section 4 – The Fairer Scotland Duty 
The Fairer Scotland Duty (‘the Duty’), Part 1 of the Equality Act 2010 places a
legal responsibility on the Council to actively consider (‘pay due regard to’)
how we can reduce inequalities of outcome caused by socio-economic
disadvantage when making decisions. 
4.1  Does the proposal have the potential to have a significant impact on
inequalities of outcome caused by socio-economic disadvantage? (consider low
income; low wealth; material deprivation; area deprivation; communities of
place or interest, socio-economic background).
Yes  ☒
No  ☐ 
If No, please go to Section 5.
If Yes please provide more information under any of the below headings which
are relevant, highlighting any evidence and sources of evidence used to inform
your information. 
4.2  Low Income/Income Poverty: Cannot afford to maintain regular payments such
as bills, food and clothing.
Although 87% of Arran has a gross household income (£31k), which is above the
North Ayrshire median (£24K) in almost 9 out of 10 Arran postcodes (875). It is
recognised that due to the rural nature of the island, there are higher living costs
and longer travel times. It is also recognised that the majority of individuals
affected at Montrose House will be over the age of 65 years and living on
retirement pensions.
In the event that a relative requires to move off island for residential care,
currently the foot passenger day return cost is £ 10.20 per adults and £5.10 per
child; subject to concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home.
The HSCP has no mechanisms available to reduce or mitigate these costs,
noting the responsibility only extends to providing care and support for the
individual requiring access to residential care.
4.3  Low/and or no wealth: Having enough money to meet basic living costs and
pay bills but have no savings to pay for any unexpected spends and no
provision for the future.
161

Page 162

Version: 6.0
17 
Although 87% of Arran has a gross household income (£31k), which is above
the North Ayrshire median (£24K) in almost 9 out of 10 Arran postcodes (875). It
is recognised that due to the rural nature of the island, there are higher living
costs and longer travel times. It is also recognised that the majority of individuals
affected at Montrose House will be over the age of 65 years and living on
retirement pensions.
In the event that a relative requires to move off island for residential care,
currently the foot passenger day return cost is £ 10.20 per adults and £5.10 per
child; subject to concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home.
The HSCP has no mechanisms available to reduce or mitigate these costs. 
4.4  Material Deprivation: Being unable to access basic goods and services, i.e.
financial products like life insurance, repair/replace broken electrical goods,
warm home, leisure/hobbies.
N/A
4.5  Area Deprivation: Where you live (rural areas), where you work (accessibility of
transport.
Although 87% of Arran has a gross household income (£31k), which is above
the North Ayrshire median (£24K) in almost 9 out of 10 Arran postcodes (875).
It is recognised that due to the rural nature of the island, there are higher living
costs and longer travel times. It is also recognised that the majority of
individuals affected at Montrose House will be over the age of 65 years and
living on retirement pensions.
In the event that a relative requires to move off island for residential care,
currently the foot passenger day return cost is £ 10.20 per adults and £5.10 per
child; subject to concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home.
The HSCP has no mechanisms available to reduce or mitigate these costs.
4.6  If impacts have been identified how will these be mitigated or explored in more
detail? (please outline below)
162

Page 163

Version: 6.0
18 
The HSCP has no mechanisms available to reduce or mitigate travel costs for
spouses, partners of families to visit relatives placed in a mainland care home.
Section 5 – Children’s Rights 
When considering the Children’s Right’s Impact process, some of the key
considerations include any evidence, research and consultation (specifically including
any consultation or engagement with young people).
5.1  Are any Children’s Rights impacted by this proposal? (please refer to Appendix
1 of this document, where the Children’s Rights Articles have been matched
against the Getting It Right For Every Child (GIRFEC) wellbeing indicators. This
is solely to make it easier to identify which rights might be impacted on; the
Rights are the key element of this section). 
Yes  ☐
No  ☒
5.2  Please indicate, if possible, how many children and young people (nearest
estimate) are likely to be affected by the policy or measure?
Although children may visit relatives living in Montrose House or those living in
mainland care homes, they are not materially affected by the proposals.
5.3  Are some children and young people more likely to be affected than others?
Yes  ☐
No  ☐
If, Yes what groups? (consider protected characteristics – e.g. disabled young
people, LGBT etc)
Click or tap here to enter text.  
163

Page 164

Version: 6.0
19 
5.4  What Children’s Rights are likely to be affected by the policy/proposal?
Please refer to Table 2 (Appendix 1) ‘Links between Wellbeing Indicators and
Articles of the UNCRC’ and insert the relevant rights and indicators in the table
below. 
Wellbeing indicator (e.g. safe,
healthy etc)
Children’s Right (e.g. 22 – refugee
children)
Click or tap here to enter text. Click or tap here to enter text.
5.5  What likely impact will the policy/proposal have on Children’s Rights and
Wellbeing? Either Positive, Negative or Neutral.
Children Rights - 
Click or tap here to enter text.
Other Protected Characteristics
Click or tap here to enter text.
5.7  What consultation or engagement has taken place with young people?
Click or tap here to enter text.
5.6  If Negative impacts are identified how will these be mitigated, or the effect
reduced?
Click or tap here to enter text. 
164

Page 165

Version: 6.0
20 
Section 6 – Island Communities Impact (or Island Proofing)
Island Proofing is about considering the particular needs and circumstances of island
communities when public sector organisations exercise their functions and make
decisions. This has been added to the process of assessing the Council Plan and
includes a range of issues such as access to services, digital connectivity,
employment and access to education, transport and access to goods and services.
6.1  Do the intended outcomes of the proposal potentially differ or have a different
impact for our Island Communities? 
Yes ☒ 
No ☐
6.2  What are the potential impacts for our Island Communities?
A full Island Impact assessment has been completed and is available online.
Montrose House Care home is on the Isle of Arran and is undertaking a review
with the following proposals: a) Older People Day Service – the traditional day
service provision closed due to infection control requirements during the Covid
19 pandemic and has not re-opened. A service review, alongside stakeholder
engagement, is taking place to identify a day service model which will best
meet the needs of future service users, and their carers. Proposal to explore a 
hybrid day-case model, which will be provided in-house and community-based
working alongside the activity coordinator.
b) Montrose House continues to face significant operational challenges related
to staffing levels, due to the limited availability of social care trained staff on the
island.  As a result of these staffing challenges there has been a reliance on
agency workers, to ensure safe staffing levels within the home. Unfortunately,
at times agency staff cover can be irregular, which affects the continuity and
quality of care delivery. The Montrose House Care Home budget has been
overspent over the last 2 financial years.  There are currently 12 residents, and
the option appraisal proposal recommends a reduction from 15 permanent
beds to 10 permanent care beds and 1 respite bed. This will improve service
resilience, safety and quality, by having a sustainable service with a staffing
model which does not rely on agency staff.  If achieved, this will result in
improved safe care delivery and the overspend being reduced significantly. 
c) The review is also proposing the development of an admissions policy to
prioritise those with familial ties on the island to access the Montrose House
beds.  
The proposed reduction in beds will result in safer staffing levels for Montrose
House residents and higher levels of continuity of care which lead to better
outcomes for people. However bed reductions may, reduce availability to beds
for some individuals which means they will have to be supported off island. 
165

Page 166

Version: 6.0
21 
It is recognised that this may cause anxiety and distress for residents and
family members; and although the island social work teams will work with
families to reduce their isolation e.g. referrals for support from carers groups, all
of this distress cannot be mitigated against.
If requested, there will be the opportunity for service users who require to move
to a bed place off island, to be on a prioritised waiting list for transfer back to
the island when there is bed availability.
It is recognised that due to the rural nature of the island, there are higher living
costs and longer travel times. It is also recognised that the majority of
individuals affected at Montrose House will be over the age of 65 years and
living on pensions.
In the event that a relative requires to move off island for residential care,
currently the foot passenger day return cost is £ 10.20 per adults and £5.10 per
child; subject to concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home.
The HSCP has no mechanisms available to reduce or mitigate these costs.
6.3  Please explain if the impacts are different for communities on different islands?
We have also completed the island impact assessment. 
Montrose House is the only Health and social care partnership managed care
home in North Ayrshire. The options appraisal highlighted the scale of care
homes offered in island communities across Scotland.  As there is no planned
closure of Montrose House, Arran reflects the national island position. 
6.4  What consultation or engagement has taken place with the Island
Communities?
Significant engagement has taken place as described in 3.4 of this report and a
full summary of the engagement is available on the IJB webpage of the North
Ayrshire Council website.
6.5  How will you address any potential barriers or wider impacts for Island
Communities as identified through this assessment? 
The barriers have been identified by the Arran community during the
engagement process and are described in section 3.4 of this report. This
impact assessment clearly described where mitigations to those barriers cannot
be demonstrated. 
166

Page 167

Version: 6.0
22 
Section 7 – The Consumer Duty 
The Consumer Duty is about the impact of Council proposals on consumers in
Scotland. A Consumer is an individual or a small business that purchases, uses or
receives goods or services in Scotland, that are supplied either by a business or a
public body – please see What is the Consumer Duty.
7.1  Will your proposal impact on consumers? 
Yes ☒
No ☐
If no, please complete the ‘Assessment not required’ template by emailing
northayrshireperforms@north-ayrshire.gov.uk 
7.2  What are the impacts, if any, on consumers in general? Is it likely that consumers
will experience harm because of this proposal? 
With the proposed reduction from the current 12 residents to 10 permanent beds
and 1 respite bed; In the event that a relative requires to move off island for
residential care, it is recognised that this may cause anxiety and distress for the
resident and family member; and although the island social work teams will work
with families to reduce their isolation e.g. referrals for support from carers groups,
all of this distress cannot be mitigated against. 
There will also be longer travel times and additional travel expenses. Currently
the foot passenger day return cost is £ 10.20 per adults and £5.10 per child;
subject to concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home.
The HSCP has no mechanisms available to reduce or mitigate these costs.
7.3  What are the impacts if any, on consumers in vulnerable circumstances? Is it
likely that consumers in vulnerable circumstances will experience harm because
of this proposal? (please include any relevant evidence or engagement with
consumers)
*Vulnerable circumstances may be temporary in nature and may or may not arise
as a resulted of a consumer’s protected characteristics. For more information,
please see page 31 of Consumer Scotland’s draft guidance on the consumer
duty.
In the event that a relative requires to move off island for residential care, it is
recognised that this may cause anxiety and distress for the resident and family
member; and although the island social work teams will work with families to
167

Page 168

Version: 6.0
23 
reduce their isolation e.g. referrals for support from carers groups, all of this
distress cannot be mitigated against. 
There will also be longer travel times and additional travel expenses. Currently
the foot passenger day return cost is £ 10.20 per adults and £5.10 per child;
subject to concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home.
The HSCP has no mechanisms available to reduce or mitigate these costs.
.
7.4  What consultation and engagement has taken place with consumers around your
proposal?
Significant engagement has taken place as described in 3.4 of this report and a
full summary of the engagement is available on the IJB webpage of the North
Ayrshire Council website. 
7.5  What alternative proposals are there that could improve outcomes for consumers
and/or reduce harm to consumers? How do these compare to the original
proposal?
An option appraisal alongside stakeholder engagement took place and no
amendments to the proposals were made.  
168

Page 169

Version: 6.0
24 
Section 8 – Crosscutting Impacts 
8.1 Have any cross-cutting impacts been identified from other Council Services or
Partner Agencies (multiple discrimination or accumulated effects of multiple
proposals on a protected characteristic group)?
None identified.
8.2  If Crosscutting issues identified with other Services, what
discussion/interaction has taken place to mitigate any potential negative
impacts of accumulated proposals?
None identified. 
169

Page 170

Version: 6.0
25 
Section 9 – Outcome of the Assessment 
9.1  Please detail the outcome of the assessment:
1.  No major alterations to the policy assessed: the Impact Assessment
demonstrates the policy is robust and there is no possible discrimination or
adverse impact. All opportunities to minimise negative impacts and enhance
positive outcomes have been taken. 
☐ Or 
2.  Adjust the policy: the Impact Assessment identifies potential problems or
missed opportunities. Adjust the policy to address any issues identified or to
better promote equality.
☐ Or 
3.  Continue the policy: the Impact Assessment identifies the potential for adverse
impact or missed opportunities to promote equality. Set out the justifications for
continuing with it in section 9.3. For the most important policies and proposals,
compelling reasons will be needed. 
☒ Or 
4.  Stop and remove the policy/proposal: following assessment a decision has
been taken not to proceed with the proposal for examples due to actual or
potential unlawful discrimination or other harmful impact.
☐
9.2  For Outcome 2. in section 9.1 above - please detail recommendations,
including any action required to address negative impacts identified or to better
promote equality.
Click or tap here to enter text.
9.3  If Outcome 3 is chosen from section 9.1 above, please outline the justifications
for continuing the policy/procedure. 
The quality and continuity of care and maintaining the provision of safe staffing
levels for residents are the key priorities for the ongoing provision of registered
residential and nursing care services at Montrose House.  The IJB faces
significant financial pressures and the additional cost of 15 beds due to
additional bank and agency staffing has been £0.5m, this is also not
sustainable financially. The HSCP has demonstrated over a period of time the
significant efforts to attempt to secure high quality care and to mitigate and
present solutions to the acute workforce challenges.  Despite these efforts,
interventions and investment there remain significant workforce challenges and
a fragile situation in managing safe staffing levels at Montrose House.   As a
result, there has been a requirement to pause new admissions to the care
home and the current proposals to implement a reduction in beds at Montrose
170

Page 171

Version: 6.0
26 
House to 10 permanent and 1 respite bed alongside the implementation of a
hybrid day service model remain the recommended way forward. Any changes
to the current bed numbers will be managed sensitively and no current
residents affected, unless their needs can no longer be met at Montrose House
or they choose to leave the care home.  There will also be exploration of an
admissions policy for future priority of access to Montrose House beds. It is not
acceptable or tolerable for the Health and Social Care Partnership to
compromise either resident or staff safety and the proposals recommended
mitigate the current risks from the 30% vacancy rate and ongoing use of
agency and bank staff. The HSCP recognises the high level of engagement
with 10% of the island putting forward their views, and also the strong level of
opposition from the island community and island staff group about the proposed
bed reduction.  The HSCP also acknowledges the distress caused to families
and service users who have to be placed in care off island and the extra costs
that this will generate for people to visit, noting that there are currently a greater
proportion of residents cared for off-island than in Montrose House. However, it
is the duty of all public organisations to deliver care safely, meeting Care
Inspectorate requirements, whilst utilising public funds in an efficient manner.
The HSCP recognises that care in Montrose House will continue to be more
expensive than the alternative cost of mainland care home placement, being
3.5 times more per individual in comparison. However, there continues to be a
commitment to delivering a local care home service from Montrose House and
the further development of integrated island services from the site if safe
staffing levels can be secured and maintained.  The Health and Care (Staffing)
(Scotland) Act 2019, places legal duties on care home providers to ensure
sufficient staffing levels and appropriate staff training – those legal
requirements are required to be considered when Local Authorities and
Integration Authorities plan and commission services.  
9.4  Please state the key issues, recommendations and future actions arising from
the Integrated Impact Assessment.
In order to ensure the quality of care, continuity of care and safe staffing levels,
the current proposals will proceed to implement a reduction in beds at
Montrose House to 10 permanent and 1 respite bed and begin the
implementation of a hybrid day service model. There will also be
exploration of an admissions policy for Montrose House beds. 
171

Page 172

Version: 6.0
27 
Section 10 – Monitoring 
10.1  Describe how you will monitor the impact of this policy e.g. performance
indicators used, other monitoring arrangements, who will monitor progress,
criteria used to measure if outcomes are achieved, timescales including any
future reviews of the impact of the proposal?
The issue of staffing levels to ensure safe care will be monitored on a daily
basis. 
Plans for admissions and waiting lists are also reviewed daily by the Integrated
Island Team. 
The development of the new day services model will also be monitored on a
monthly basis as the new model develops. 
The plans to develop a new admissions policy will also be subject to further
engagement, at a later stage.
Section 11 – Sign Off
11.1  Head of Service who has approved the impact assessment.
Name: Kerry Logan 
Title: Head of Service
Date: 13082025
Section 12 – Publication
12.1  Following approval by Head of Service, completed Impact Assessments need
to be published on the Council’s External Website. 
Please email: northayrshireperforms@north-ayrshire.gov.uk 
172

Page 173

Version: 6.0
28 
Appendix 1 - GIRFEC Wellbeing Indicators and Children’s Rights 
Table 1 - GIRFEC Wellbeing Indicators 
Safe Protected from abuse, neglect and harm
Healthy Having the best possible standards of physical and mental
health; support to make healthy, safe choices
Achieving  Accomplishing goals and thereby boosting skills,
confidence and self-esteem; ‘being all they can be’.
Nurtured Having a loving and stimulating place to live and grow
Active Having opportunities to take part in a wide range of
activities
Respected Being enabled to understand their world, being given a
voice, being listened to, and being involved in the decisions
that affect their wellbeing.
Responsible Taking an active role within their home, school and
community.
Included Being a full member of the communities in which they live
and learn; receiving help and guidance to overcome
inequalities.  
173

Page 174

Version: 6.0
29 
Articles of the UNCRC matched against the GIRFEC indicators. 
Summary of the UNCRC Articles from 1 – 54 (UNICEF)
Table 2 - Links between Wellbeing Indicators and Articles of the UNCRC 
*Please note in general the use of the term Governments, includes public
sector organisations such as the Council, some articles will have stronger
relevance for the work of the Council than others. 
Wellbeing Indicator – Safe
There are 12 relevant articles of the UNCRC (Rights of the Child) linked to the Safe
indicator.
Article 9 – Separation from parents
Children must not be separated from their parents against their will unless it is in
their best interests (for example, if a parent is hurting or neglecting a child). Children
whose parents have separated have the right to stay in contact with both parents,
unless this could cause them harm.
10 – Family reunification
Governments must respond quickly and sympathetically if a child or their parents
apply to live together in the same country. If a child’s parents live apart in different
countries, the child has the right to visit and keep in contact with both of them.
11 - Abduction and non-return of children 
Governments must do everything they can to stop children being taken out of their
own country illegally by their parents or other relatives or being prevented from
returning home.
19 - Protection from violence, abuse and neglect 
Governments must do all they can to ensure that children are protected from all
forms of violence, abuse, neglect and bad treatment by their parents or anyone else
who looks after them. Children and Young People have the right to be kept safe from
harm. They must be given proper care by those looking after them.
22 - Refugee children 
If a child is seeking refuge or has refugee status, governments must provide them
with appropriate protection and assistance to help them enjoy all the rights in the
Convention. Governments must help refugee children who are separated from their
parents to be reunited with them. Children and Young People have the right to
special help and be allowed to live somewhere that is safe if they are a refugee. 
174

Page 175

Version: 6.0
30 
32 - Child labour 
Governments must protect children from economic exploitation and work that is
dangerous or might harm their health, development or education. Governments must
set a minimum age for children to work and ensure that work conditions are safe and
appropriate.
If they are under 16 there are laws about where, when and for how long they can
work.
33 - Drug abuse
Governments must protect children from the illegal use of drugs and from being
involved in the production or distribution of drugs.
34 - Sexual exploitation 
Governments must protect children from all forms of sexual abuse and exploitation.
Children and Young People have the right to never be pressurised or forced into
doing anything sexual. They have the right to be protected from it. 
35 - Abduction, sale and trafficking 
Governments must protect children from being abducted, sold or moved illegally to a
different place in or outside their country for the purpose of exploitation. People
should never make them do anything against their will, like marry someone for
instance.
36 - Other forms of exploitation 
Governments must protect children from all other forms of exploitation, for example
the exploitation of children for political activities, by the media or for medical
research. Children and Young People have the right to be protected from being
taken advantage of in any way.
37 - Inhumane treatment and detention 
Children and Young People have the right to be treated with respect. If they have
committed a crime children should be arrested, detained or imprisoned only as a last
resort and for the shortest time possible. They must be treated with respect and care
and be able to keep in contact with their family. Children must not be put in prison
with adults. They should not be locked up unless it is absolutely necessary, and they
will get legal help.
38 - War and armed conflicts 
Governments must not allow children under the age of 15 to take part in war or join
the armed forces. Governments must do everything they can to protect and care for
children affected by war and armed conflicts. In Scotland, they have to be 16 to join
the armed forces and are not normally allowed to fight until they are 18.  
175

Page 176

Version: 6.0
31 
Wellbeing Indicator – Healthy 
There are 4 relevant articles of the UNCRC (Rights of the Child) linked to the Healthy
indicator.
3 – Best interests of the child 
The best interests of the child must be a top priority in all decisions and actions that
affect children. Children and Young People have the right to have their interests
considered if a decision is being made by any person about them. What is best for
them is what matters.
6 – Life, survival and development 
Every child has the right to life. Governments must do all they can to ensure that
children survive and develop to their full potential. Children and Young People have
the right to be kept safe from harm, they have the right to be alive, survive and
develop through life.
24 - Health and health services
Every child has the right to the best possible health. Governments must provide
good quality health care, clean water, nutritious food, and a clean environment and
education on health and well-being so that children can stay healthy. Children and
Young People have the right to be given good healthcare (if they are ill) so they can
get well again. They have the right to live in a safe, healthy environment with good
food and clean drinking water.
39 - Recovery and rehabilitation of child victims 
Children who have experienced neglect, abuse, exploitation, torture or who are
victims of war must receive special support to help them recover their health, dignity,
self-respect and social life.  
176

Page 177

Version: 6.0
32 
Wellbeing Indicator – Achieving 
There are 4 relevant articles of the UNCRC (Rights of the Child) linked to the
Achieving indicator.
4 – Implementation of the Convention 
Governments must do all they can to make sure every child can enjoy their rights by
creating systems and passing laws that promote and protect Children’s Rights.
Children and Young People have the right to have their rights protected and an
environment where they can grow up safe. 
18 - Parental responsibilities and state assistance 
Both parents share responsibility for bringing up their child and should always
consider what is best for the child. Governments must support parents by creating
support services for children and giving parents the help they need to raise their
children.
28 - Right to education 
Every child has the right to an education. Primary education must be free and
different forms of secondary education must be available to every child. Discipline in
schools must respect children’s dignity and their rights. Richer countries must help
poorer countries achieve this.
In Scotland education is free and children three years old+ are entitled to a free
nursery place.
29 - Goals of education 
Education must develop every child’s personality, talents and abilities to the full. It
must encourage the child’s respect for human rights, as well as respect for their
parents, their own and other cultures, and the environment. It must help to prepare
them for adult life.  
177

Page 178

Version: 6.0
33 
Wellbeing Indicator – Nurtured 
There are 8 relevant articles of the UNCRC (Rights of the Child) linked to the
Nurtured indicator.
4 – Implementation of the Convention 
Governments must do all they can to make sure every child can enjoy their rights by
creating systems and passing laws that promote and protect children’s rights
Children and Young People have the right to have their rights protected and an
environment where they can grow up safe. 
5 - Parental guidance and a child’s evolving capacities 
Every child has the right to be registered at birth, to have a name and nationality,
and, as far as possible, to know and be cared for by their parents. Children and
Young People have the right to their parents being responsible to guide them
through their childhood and help them learn how to use their rights. 
9 – Separation from parents
Children must not be separated from their parents against their will unless it is in
their best interests (for example, if a parent is hurting or neglecting a child). Children
whose parents have separated have the right to stay in contact with both parents,
unless this could cause them harm.
10 – Family reunification
Governments must respond quickly and sympathetically if a child or their parents
apply to live together in the same country. If a child’s parents live apart in different
countries, the child has the right to visit and keep in contact with both of them.
18 - Parental responsibilities and state assistance
Both parents share responsibility for bringing up their child and should always
consider what is best for the child. Governments must support parents by creating
support services for children and giving parents the help they need to raise their
children.
20 - Children deprived of a family
If a child cannot be looked after by their immediate family, the government must give
them special protection and assistance. This includes making sure the child is
provided with alternative care that is continuous and respects the child’s culture,
language and religion. Children and Young People have the right to special care if
they can’t live with their parents. They may be looked after by other members of their
family or by a different family.
21 - Adoption 
Governments must oversee the process of adoption to make sure it is safe, lawful
and that it prioritises children’s best interests. Children should only be adopted
178

Page 179

Version: 6.0
34 
outside of their country if they cannot be placed with a family in their own country. 25
- Review of treatment in care 
If a child has been placed away from home for the purpose of care or protection (for
example, with a foster family, in hospital, a care home or somewhere else away from
home), they have the right to a regular review of their treatment, the way they are
cared for and their wider circumstances to help make sure they are still getting
what’s best for them.
27 - Adequate standard of living
Every child has the right to a standard of living that is good enough to meet their
physical and social needs and support their development. Governments must help
families who cannot afford to provide this. Children and Young People have the right
to a safe place to live, food, clothing and to take part in things they enjoy. 
179

Page 180

Version: 6.0
35 
Wellbeing Indicator – Active 
There are 8 relevant articles of the UNCRC (Rights of the Child) linked to the
Nurtured indicator.
3 - Best interests of the child 
The best interests of the child must be a top priority in all decisions and actions that
affect children. Children and Young People have the right to have their interests
considered if a decision is being made by any person about them. What is best for
them is what matters.
23 - Children with disabilities
A child with a disability has the right to live a full and decent life with dignity and, as
far as possible, independence and to play an active part in the community.
Governments must do all they can to support disabled children and their families.
Children and Young People have the right to if they have any kind of disability, have
special help to make sure they can join in with things. 
31 - Leisure, play and culture
Children and Young People have the right to rest, play and have the chance to join a
wide range of artistic and cultural activities. It is really important to remember to have
a balance in their life. 
180

Page 181

Version: 6.0
36 
Wellbeing Indicator – Respected
There are 12 relevant articles of the UNCRC (Rights of the Child) linked to the
Nurtured indicator.
2 - Non-discrimination 
Children and Young People have the right to have the convention that applies to
everyone under the age of 18, no matter who they are, whether they are a boy or a
girl, what their religion is, whether they have a disability, or what type of family they
come from.
3 - Best interests of the child 
The best interests of the child must be a top priority in all decisions and actions that
affect children. Children and Young People have the right to have their interests
considered if a decision is being made by any person about them. What is best for
them is what matters.
4 – Implementation of the Convention
Governments must do all they can to make sure every child can enjoy their rights by
creating systems and passing laws that promote and protect children’s rights.
Children and Young People have the right to have their rights protected and an
environment where they can grow up safe. 
5 - Parental guidance and a child’s evolving capacities
Every child has the right to be registered at birth, to have a name and nationality,
and, as far as possible, to know and be cared for by their parents. Children and
Young People have the right to their parents being responsible to guide them
through their childhood and help them learn how to use their rights. 
8 - Protection and preservation of identity
Every child has the right to an identity. Governments must respect and protect that
right, and prevent the child’s name, nationality or family relationships from being
changed unlawfully. Children and Young People have the right to know who they are
– official records should be kept. If they are over 16 years old and adopted, they can
try to find out who their birth parents are.
12 - Respect for the views of the child 
Every child has the right to express their views, feelings and wishes in all matters
affecting them, and to have their views considered and taken seriously. This right
applies at all times, for example during immigration proceedings, housing decisions
or the child’s day-to-day home life. Children and Young People have the right to
speak up and have their opinions listened to and be taken seriously by adults on
things that affect them.  
181

Page 182

Version: 6.0
37 
13 - Freedom of expression 
Every child must be free to express their thoughts and opinions and to access all
kinds of information, as long as it is within the law. Children and Young People have
the right to say whatever they believe as long as it does not harm or offend other
people. They also have the responsibility to respect the rights and freedom of others.
14 - Freedom of thought, belief and religion 
Every child has the right to think and believe what they choose and also to practise
their religion, as long as they are not stopping other people from enjoying their rights.
Governments must respect the rights and responsibilities of parents to guide their
child as they grow up. Children and Young People have the right to choose their own
religion and beliefs. Their parents should help them think about this.
16 - Right to privacy
Every child has the right to privacy. The law should protect the child’s private, family
and home life, including protecting children from unlawful attacks that harm their
reputation, for example, they shouldn’t have their personal letters opened or anyone
listening in to their personal phone calls.
17 - Access to information; mass media
Every child has the right to reliable information from a variety of sources, and
Governments should encourage the media to provide information that children can
understand. Governments must help protect children from materials that could harm
them. Children and Young People have the right to access information which is
important to their wellbeing. Adults should help them find information they are
looking for and make sure it’s not harmful. 
18 - Parental responsibilities and state assistance
Both parents share responsibility for bringing up their child and should always
consider what is best for the child. Governments must support parents by creating
support services for children and giving parents the help they need to raise their
children.
30 - The right to learn and use the language, customs and religion of their
family
Every child has the right to learn and use the language, customs and religion of their
family, whether or not these are shared by the majority of the people in the country
where they live.  
182

Page 183

Version: 6.0
38 
Wellbeing Indicator – Responsible 
There are 5 relevant articles of the UNCRC (Rights of the Child) linked to the
Responsible indicator.
3 - Best interests of the child 
The best interests of the child must be a top priority in all decisions and actions that
affect children. Children and Young People have the right to have their interests
considered if a decision is being made by any person about them. What is best for
them is what matters.
12 - Respect for the views of the child 
Every child has the right to express their views, feelings and wishes in all matters
affecting them, and to have their views considered and taken seriously. This right
applies at all times, for example during immigration proceedings, housing decisions
or the child’s day-to-day home life. Children and Young People have the right to
speak up and have their opinions listened to and be taken seriously by adults on
things that affect them.
14 - freedom of thought, conscience and religion 
Every child has the right to think and believe what they choose and also to practise
their religion, as long as they are not stopping other people from enjoying their rights.
Governments must respect the rights and responsibilities of parents to guide their
child as they grow up. Children and Young People have the right to choose their own
religion and beliefs. Their parents should help them think about this.
15 - Freedom of association 
Every child has the right to meet with other children and to join groups and
organisations, as long as this does not stop other people from enjoying their rights. 
40 - Juvenile justice 
A child accused or guilty of breaking the law must be treated with dignity and
respect. They have the right to legal assistance and a fair trial that takes account of
their age. Governments must set a minimum age for children to be tried in a criminal
court and manage a justice system that enables children who have been in conflict
with the law to reintegrate into society. Children and Young People have the right to
be given legal assistance if they have committed a crime. The Convention also
states that they should only be sent to prison if they have committed a serious crime.  
183

Page 184

Version: 6.0
39 
Wellbeing Indicator – Included 
There are 5 relevant articles of the UNCRC (Rights of the Child) linked to the
Included indicator.
3 - Best interests of the child 
The best interests of the child must be a top priority in all decisions and actions that
affect children. Children and Young People have the right to have their interests
considered if a decision is being made by any person about them. What is best for
them is what matters. 
6 - Life, survival and development 
Every child has the right to life. Governments must do all they can to ensure that
children survive and develop to their full potential. Children and Young People have
the right to be kept safe from harm, they have the right to be alive, survive and
develop through life.
18 - Parental responsibilities and state assistance 
Both parents share responsibility for bringing up their child and should always
consider what is best for the child. Governments must support parents by creating
support services for children and giving parents the help they need to raise their
children.
23 - Children with disabilities
A child with a disability has the right to live a full and decent life with dignity and, as
far as possible, independence and to play an active part in the community.
Governments must do all they can to support disabled children and their families.
Children and Young People have the right to special help to make sure they can join
in with things. 
26 - Social security 
Every child has the right to benefit from social security. Governments must provide
social security, including financial support and other benefits, to families in need of
assistance. 
27 - Adequate standard of living 
Every child has the right to a standard of living that is good enough to meet their
physical and social needs and support their development. Governments must help
families who cannot afford to provide this. Children and Young People have the right
to a safe place to live, food, clothing and to take part in things they enjoy.
184

Page 185

1 
APPENDIX 1 - ISLAND COMMUNITIES IMPACT ASSESSMENT 
ISLE OF ARRAN 
Please ensure this template is completed in conjunction with the Island Communities Impact Assessment (ICIA) Guidance on the
Scot Gov Website 
Name of Policy, Strategy or Service Montrose House - Arran 
STEP ONE – DEVELOP A
CLEAR UNDERSTANDING OF
YOUR OBJECTIVES 
What are the objectives of the
policy, strategy or service?
Montrose House Care home on the Isle of Arran is undertaking a review of the existing
services due to the following: 
a) Older People Day Service – the traditional day service provision closed due to infection
control requirements during the Covid 19 pandemic and has not re-opened. A service review,
alongside stakeholder engagement, is taking place to identify a day service model which will
best meet the needs of future service users, and their carers. Proposal to explore a hybrid
day-case model, that will be provided in-house and community-based working alongside the
activity coordinator 
b) Montrose House continues to face significant operational challenges related to staffing
levels, due to the limited availability of social care trained staff on the island.  As a result of
these staffing challenges there has been a  reliance on agency workers, to ensure safe
staffing levels within the home. Unfortunately, at times agency staff cover can be irregular,
which affects the continuity and quality of care delivery. As a result the Montrose House Care
Home budget has been overspent over the last 2 financial years.  There are currently 12
residents, and the option appraisal proposal recommends a reduction from 15 permanent
beds to 10 permanent care beds and 1 respite bed. This will improve service resilience,
safety and quality, by having a sustainable service with a staffing model which does not rely
185

Page 186

2 
on agency staff.  If achieved, this will result in improved safe care delivery and the overspend
being reduced significantly. 
c) The review is also proposing the development of an admissions policy to prioritise those
with familial ties on the island to access the Montrose House beds.   
186

Page 187

3 
Do you need to consult? The service review requires robust engagement, and this is captured at in section 3 of this
report. The engagement will influence the proposals and identify key barriers for
mitigation, where this is available.
How are islands identified for the
purpose of the policy, strategy or
service?
This policy would only apply to Montrose House Care home on the Isle of Arran
What are the intended impacts /
outcomes and how do these
potentially differ in the islands? –
EMPHASISE HOW IT DIFFERS
FROM MAINLAND
Montrose House on Arran is the only Health and Social Care Partnership managed care
home and as a result this policy does not apply to the mainland or the Isle of Cumbrae,
where care homes are delivered by the private independent sector. 
Is the policy, strategy or service
new?
Yes. Although the service at Montrose House is well established the following new
changes are proposed: 
a) Older People Day Service – the traditional day service provision closed due to infection
control requirements during the Covid 19 pandemic and has not re-opened. A service
review, alongside stakeholder engagement, is taking place to identify a day service model
which will best meet the needs of future service users, and their carers. Proposal to
explore a hybrid day-case model, that will be provided in-house and community-based
working alongside the activity coordinator 
b) Montrose House continues to face significant operational challenges related to staffing
levels, due to the limited availability of social care trained staff on the island.  As a result of
these staffing challenges there has been a  reliance on agency workers, to ensure safe
staffing levels within the home. Unfortunately, at times agency staff cover can be irregular,
which affects the continuity and quality of care delivery. As a result the Montrose House
Care Home budget has been overspent over the last 2 financial years.  There are currently
12 residents, and the option appraisal proposal recommends a reduction from 15
permanent beds to 10 permanent care beds and 1 respite bed. This will improve service
resilience, safety and quality, by having a sustainable service with a staffing model which
does not rely on agency staff.  If achieved, this will result in improved safe care delivery
and the overspend being reduced significantly. 
187

Page 188

4 
c) The review is also proposing the development of an admissions policy to prioritise those
with familial ties on the island to access the Montrose House beds.   
STEP TWO – GATHER YOUR
DATA AND IDENTIFY YOUR
STAKEHOLDERS 
What data is available about the
current situation in the islands?
There has been the collection and analysis of a wide range of data sources:
1. Arran Locality Profile 2017 [http://northayrshire.community/wp-
content/uploads/2018/02/Locality-Profile_Arran_Final_Version_Sept2017.pdf]  
2. Arran Integrated Island Service Review - Initial Review 20th July 2020 [2020-08-17-bm-
p24-arran-integrated-island-services-initial-agreement.pdf] 
3. Isle of Arran – Local Island Plan March 2022 [https://www.north-
ayrshire.gov.uk/Document-library/arran-local-island-plan.pdf] 
4. Scottish Census 2022 [https://www.scotlandscensus.gov.uk/] 
5. Health & Social Care Partnership – Integrated Island Services Management
Information on workforce, workforce recruitment, financial, resident needs, etc. [internal
– not for publication] 
Do you need to consult? Yes. 
Montrose House Engagement - Goals of Engagement 
The engagement will provide background information and awareness of the proposals a)
older people day services b) Montrose house bed reduction and  c) a new admissions
policy. 
The proposals will highlight the positive changes, such as the re-introduction of hybrid day-
case model, that will be provided in-house and community-based working alongside the
188

Page 189

5 
activity coordinator. It will be helpful to get feedback on this approach, from community
views of a workable model. 
The engagement will include reasons for the proposals, driven by critical staffing
challenges and focussing on the difficulty in providing safe person-centred care. This will
also highlight the financial pressures created due to the use of agency staff. 
The engagement event will provide an awareness of the admission processes/ waiting list
for beds if assessed as suitable for Montrose House. 
What we want to achieve from engagement?
Receiving feedback on the proposals; as well as providing reassurance and alleviate any
concerns the community may have. This information will be fed back to the NAHSCP
senior management team and will be included in the updated ECRIA and IJB report for
submission in August 2025. 
Montrose House Engagement drop in Event was held within Montrose House by the Arran
Senior Management team on 22nd July 2025 from 1000-1200. The audience was the
public, residents, families, and visitors. 
The drop-in session will include:
• public, residents, families, and visitors provided with a leaflet/flyer in Montrose
House for the Questionnaire/Online Survey. Survey can be accessed by a QR code
but paper copies available for completion at face-to-face sessions and uploaded
later.
• Prepared, clear concise answers to questions that might be raised to ensure that all
staff participating in the event are collectively sharing the same information. 
The details of the drop-in were emailed to 16 community groups; the details of which were
provided by the Arran Community Voluntary Organisation. These groups included Brodick
and Lamlash Sheltered Housing complexes, Older People Groups, Lunch Clubs,
Community Councils, and patient participation groups.
Posters about the drop-in session were shared at Montrose House and GP surgeries.           
Service Users and Partner staff
189

Page 190

6 
The Questionnaire/Online Survey using a QR code was available, from 15 July 2025 to 1st
August 2025; with paper copies available too for completion. Members of the public were
provided with support from variety of HSCP staff.
1. Care at Home & Alert service users - completion supported by Care at home staff. 
2. District Nursing caseload patients-completion supported by District Nursing staff.
3. patient participation groups- support from primary care
4. Relevant community groups-Vicki Yuill ACVS providing contact details.
5. Support from engagement team required with preparation of survey/questionnaire,
QR code and analysis/overview of results 
There were 458 responses to the Residents, Families and Wider Island Community survey
∗ The majority reported having a spouse (36%) and/or wider family (35%) living
locally. 18% said they have children on the island, while 10% (48 respondents)
indicated they have no family living on Arran
∗ The vast majority of respondents, 82.8% (403 people) do not currently receive
support from health and social care services on the Isle of Arran
∗ 97% of respondents (444 individuals) were aware of the current recruitment
challenges across various sectors of Isle of Arran,
∗ 97.6% (447) of recipients opposed the recent change in bed capacity at Montrose
House. 1.5% (7) were in favour and 0.9% (4) were unsure if it was the correct
move.
∗ 73.1% of respondents (“Definitely”: 37.3% and “Possibly”: 35.8%) would consider
using an outreach day care service on Arran, while only 3.3% said No and 5.2%
said Unlikely, with 18.3% Unsure.
∗ 32% (145 people) support the proposed admissions policy approach, while 23%
(105 people) oppose it. An additional 27% (125 people) are unsure, 5% (24 people)
would support it with certain conditions, and 13% (59 people) selected "Other.“ 
Key themes:
• Strong Opposition and Emotional Distress
• Primary Concerns About Mainland Relocation 
190

Page 191

7 
o Forced Displacement from the island/ Family Separation 
o Personal and Family Impact Stories
• Ferry Service Complications 
o Visiting Challenges 
• Staffing and Quality of Care Perspectives 
o Understanding of Staffing Challenges 
o Conditional Support for Quality Care 
• Use of Purpose-Built Facility 
o Underuse of Purpose-Built Facility 
• Distrust of Motivations 
o Suspicion of Cost-Cutting 
• Demographic and Demand Considerations 
o Ageing Population Needs 
• Impact on Other Services 
o Pressure on Healthcare System 
There were 23 respondents to the Staff, Professionals and Wider Partners survey.
96% (22 out of 23 participants), are residents of the Isle of Arran while only 4% (1
participant) is not.
The majority of respondents (61%) did not support the proposed change. 
Four professionals (17%) agreed with the proposal, with only one qualifying their feedback
by stating, "If that's all we can staff, it's all we can staff." 
How does any existing data differ
between islands?
The options appraisal paper, which has been published as an appendix to the Integration
Joint Board report  (IJB), 21 August 2025 is available on the IJB page of the North
Ayrshire Council website. 
The option appraisal has undertaken a detailed analysis of the island community on Arran
and comparisons with other islands with older people care homes. 
191

Page 192

8 
Care Homes – Island Comparison
Comparisons with other island services are covered below. We used the following
classifications from the Scottish Government. Islands/island groupings with mid to high
population levels, have populations which are higher than at least 60% of the islands
covered in this chapter, but lower than 10% of the islands covered by this chapter 
The population of these islands varies significantly. The islands in this category are:
• Bute (population 6,498)
• Uist & connected isles (population 4,846)
• Arran (population 4,629)
• Islay (population 3,228)
• Mull (population 2,800)
• Great Cumbrae (population 1,376)
• Barra & Vatersay (population 1,264)
• Whalsay (population 1,061)
• Yell (population 966)
• Tiree (population 653)
• Unst (population 632)
• Westray (population 588)
• Seil (population 551)
• Sanday (Orkney) (population 494)
• Hoy & Walls (population 419)
• Bressay (population 368) 
A comparison of Care Homes within these areas found that the national average of bed
spaces available is twelve as described at Chart 1. 
192

Page 193

9 
Chart 1: Care Home Capacity 
There are 16 Care Homes within North Ayrshire. Montrose House on Arran currently has a
vacancy rate of 13.3%, which is significantly higher than the overall average vacancy rate
across care homes in North Ayrshire, which stands at approximately 6.6% [see chart 2]. 
193

Page 194

10 
Chart 2 Vacancy % by Care Home 
194

Page 195

11 
Are there any existing design
features or mitigations in place?
The Health and Social Care partnership has provided accommodation for staff who travel
to Arran to deliver key services on Arran. Nursing and Care staff also receive a financial
enhancement to work on the isle of Arran. However, neither mitigation have resolved the
staffing challenges at Montrose House. 
STEP THREE – CONSULTATION 
Who do you need to consult with? The engagement will be open to all members of the public, community organisations,
residents and families using Montrose House and staff. 
How will you carry out your
consultation and in what
timescales?
Montrose House Engagement drop in Event was held within Montrose House by the Arran
Senior Management team on 22nd July 2025. 
A public online survey was opened on the 15 July 2025 to 1st August 2025  and paper
copies were also made available. Staff supported people to complete the paper copies.
A staff online survey was opened on the 25th July to the 1st August 2025. 
10 % of the island community contributed their views. 
What questions will you ask when
considering how to address island
realities?
A full analysis of the questions asked is available on the IJB page of the North Ayrshire
Council website. 
With reference to the consultation undertaken, due to the nature of some of the feedback
which includes the personal circumstances of some respondents, and in order to avoid
any risk of identification, full details have not been made publicly available, however, full
details of consultation responses have been shared with Integration Joint Board members
on a confidential basis.
What information has already been
gathered through consultations and
what concerns have been raised
previously by island communities?
Previous engagement on the island plan highlighted the following areas of concern: 
- Staff sustainability due to the high cost of housing, reducing the attractiveness of
living on the island.
195

Page 196

12 
- Growth in the aging population of the island and the lack of working age population
to provide support, 
Is your consultation robust and
meaningful and sufficient to comply
with the Section 7 duty?
The Consultation undertaken between 15 July 2025 to 1st August 2025 has been
determined by officers as robust and meaningful and sufficient to comply with the Section
7 duty. 
STEP FOUR - ASSESSMENT 
Does your assessment identify any
unique impacts on island
communities?
As a result of a lack of staffing to offer social care support, which has raised concerns
about safe staffing levels the following new changes are proposed: 
a) Older People Day Service – the traditional day service provision closed due to infection
control requirements during the Covid 19 pandemic and has not re-opened. A service
review, alongside stakeholder engagement, is taking place to identify a day service model
which will best meet the needs of future service users, and their carers. Proposal to
explore a hybrid day-case model, that will be provided in-house and community-based
working alongside the activity coordinator 
b) Montrose House continues to face significant operational challenges related to staffing
levels, due to the limited availability of social care trained staff on the island.  As a result of
these staffing challenges there has been a  reliance on agency workers, to ensure safe
staffing levels within the home. Unfortunately, at times agency staff cover can be irregular,
which affects the continuity and quality of care delivery. As a result the Montrose House
Care Home budget has been overspent over the last 2 financial years.  There are currently
12 residents, and the option appraisal proposal recommends a reduction from 15
permanent beds to 10 permanent care beds and 1 respite bed. This will improve service
resilience, safety and quality, by having a sustainable service with a staffing model which
does not rely on agency staff.  If achieved, this will result in improved safe care delivery
and the overspend being reduced significantly. 
c) The review is also proposing the development of an admissions policy to prioritise those
with familial ties on the island to access the Montrose House beds.   
196

Page 197

13 
The assessment identifies that not all residents of Arran will be able to be supported at
Montrose House in the future and that off island placements may cause distress and
additional expenses to those visiting, as described in the section below.
It should also be noted that North Ayrshire Health and Social Care Partnership currently
funds 816 placements for adults over 65 in care homes within and outside North Ayrshire.
Montrose House accounts for 1.6% of the total service users currently funded for care
home places. Of these, 606 residents (74%) are accommodated in care homes based in
North Ayrshire, while 210 residents (26%) are placed outside the local authority area. 
Does your assessment identify any
potential barriers or wider impacts?
The assessment has identified the following impacts and barriers. In the event that a
relative requires to move off island for residential care, it is recognised that this may cause
anxiety and distress for the resident and family member; and although the island social
work teams will work with families to reduce their isolation e.g. referrals for support from
carers groups, all of this distress cannot be mitigated against. 
There will also be longer travel times and additional travel expenses. Currently the foot
passenger day return cost is £ 10.20 per adults and £5.10 per child; subject to
concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home. 
The HSCP has no mechanisms available to reduce or mitigate these costs, noting the
responsibility only extends to providing care and support for the individual requiring access
to residential care. 
How will you address these? The HSCP has no mechanisms available to reduce or mitigate the issues highlighted
above.
You must now determine whether
in your opinion your policy,
strategy or service is likely to
have an effect on an island
community which is significantly
different from its effect on other 
YES.
197

Page 198

14 
communities (including other
island communities).
STEP FIVE – PREPARING YOUR
ICIA 
Assess the extent to which you
consider that the policy, strategy or
service can be developed or
delivered in such a manner as to
improve or mitigate, for island
communities, the outcomes
resulting from it.
In the event that a relative requires to move off island for residential care, it is recognised
that this may cause anxiety and distress for the resident and family member; and although
the island social work teams will work with families to reduce their isolation e.g. referrals
for support from carers groups, all of this distress cannot be mitigated against. 
There will also be longer travel times and additional travel expenses. Currently the foot
passenger day return cost is £ 10.20 per adults and £5.10 per child; subject to
concessions.
There may also be bus/train fares from ferry to home and ferry to care home.
It also costs £51.20 to take a car on a return trip.
There may also be car fuel costs from ferry to home and ferry to care home. 
The HSCP has no mechanisms available to reduce or mitigate these costs , noting the
responsibility only extends to providing care and support for the individual requiring access
to residential care. 
Consider alternative delivery
mechanisms and whether further
consultation is required.
There are no other delivery models available due to the lack of staffing capacity.  
Describe how these alternative
delivery mechanisms will improve or
mitigate outcomes for island
communities.
Any further required mitigations will continue to be assessed on an ongoing basis.
Identify resources required to
improve or mitigate outcomes for
island communities.
In order to sustain current levels of bed capacity on Arran this would require an additional
£0.50million per annum, to cover agency staff costs. However this will not ensure
continuity of care as staff from agencies are often not regular.
198

Page 199

15 
STEP SIX – MAKING
ADJUSTMENTS TO YOUR WORK 
Should delivery
mechanisms/mitigations vary in
different communities?
Montrose House on Arran is the only Health and Social Care Partnership managed care
home and as a result this policy does not apply to the mainland, where care homes are
delivered by the private independent sector. 
Do you need to consult with island
communities in respect of
mechanisms or mitigations?
Island communities have provided detailed feedback on the proposals. A full analysis of
the questions asked is available on the IJB page of the North Ayrshire Council website. 
In the event of any unintended consequences of this policy being identified in the course of
ongoing monitoring, consideration will be given to appropriate steps which may be
required to mitigate these across different communities as required, including whether
further consultation is required.
Have island circumstances been
factored into the evaluation
process?
The particular circumstances on Arran have factored into the evaluation process as set out
above.
Have any island-specific
indicators/targets been identified
that require monitoring?
A target of 10 permanent beds and 1 respite bed has been identified.
A suite of performance measures will be developed for the hybrid day service model as it
is developed.
How will outcomes be measured on
the islands?
Monitoring the number of residents taking up day services and the number of residents
waiting for a bed at Montrose House and those being placed off island, will provide a
sufficient level of information to assess the ongoing impact of the policy and any
associated outcomes.
A suite of performance measures will be developed for the hybrid day service model as it
is developed.
How has the policy, strategy or
service affected island
communities?
This would be monitored on an ongoing basis.
How will lessons learned in this ICIA
inform future policy making and
service delivery?
This would be assessed on an ongoing basis as the policy was implemented.
199

Page 200

16 
STEP SEVEN – PUBLISHING
YOUR ICIA 
Have you presented your ICIA in an
Easy Read format?
No.
Does it need to be presented in
Gaelic or any other language?
This is not considered proportionate for the Island or wider North Ayrshire community
Where will you publish your ICIA
and will relevant stakeholders be
able to easily access it?
The completed ICIA will be included in a report to North Ayrshire integration Board
scheduled for 21 August 2025, therefore, the information will be publicly available.
Who will sign-off your final ICIA and
why? 
ICIA approved by: ……………KerryKerry Logan……………………………………………………………… 
Position:         ……………Head of Health & Community Care……………………………………………………………… 
Signature:         …………………………………………………………………………… 
Date completed:   ………………12082025…………………………………………………………… 
ICIA approved by: …………………………………………………………………………… 
Position:         …………………………………………………………………………… 
Signature:         …………………………………………………………………………… 
Date completed:   …………………………………………………………………………… 
200

Page 201

Integrated Joint Board
21st August, 2025
Subject : Transformation Plan – Progress Update  
Purpose : This paper updates the IJB on the progress of the HSCP
transformation plan.
Recommendation : The Integration Joint Board are asked to note the progress to
date. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
IJB  Integrated Joint Board 
PID  Project Initiation Document 
SDS Self Directed Support 
1. EXECUTIVE SUMMARY 
1.1 The North Ayrshire HSCP Transformation Plan 2024-27 is an ambitious programme
of change consisting of a range of improvement and reform projects across all service
areas, each aiming to improve the quality of our services and contribute to the long-
term sustainability of health and care in North Ayrshire.  This report highlights key
activity and general updates on progress made in the last six months. 
2. BACKGROUND 
2.1 The 3 year Transformation Plan was approved by IJB in March 2024. There are 77
change projects and programmes on the plan, from across every area of the
partnership.  The Plan is  kept under review and updated through the Transformation
Board. 
2.2 Six-month progress updates were provided to IJB in September 2024, December
2024 and a further update on Q3 at the meeting on 6th February 2025.   It has been
agreed that updates will be every six months.   
2.3  Through 24-25 the financial outlook deteriorated, and the need for transformation and
the redesign of services became more urgent and more important to the long-term
sustainability of the functions for which we are responsible. At the same time our
Agenda Item 7
201

Page 202

capacity for change diminished due to increasing demands on people’s capacity
including the short-term actions required to deliver the financial recovery plan. There
remains a focus and commitment across services to progress the high priority areas
agreed as part of the Plan. 
Key Activity 
2.4 January to March 2025 
January 
• ‘Focus on Adult Health and Community Care’ with a review of 24/25 and five
new projects initiated, as well as the successful closure on the plan of the Blue
Badges project. 
February 
• ‘Focus on Children, Families, and Justice’, with a review of 24/25 and a deep
dive into the progress of the Brighter Pathways programme. 
March 
• The fourth Ayrshire-wide Innovation Event with colleagues from Public Health
Scotland presenting their Innovation Strategy; the Service Design Academy
provided an overview of their approach (which is the Scottish Government
approach) to service design. We also had colleagues from South Ayrshire
sharing their new Integrated Impact Assessment, as well as a useful recap from
the Digital Health and Care Scotland 2025 conference in Edinburgh. 
• The Health and Social Care Transformation conference 2025 was also in
March, and North Ayrshire was well represented, learning about the progress
of the national Digital Front Door programme as well as other policy and
strategy updates, alongside a range world-class industry and health and social
care speakers. AI was a key theme with a number of impactful examples from
the health sector. 
• ‘Focus on Mental Health and Learning Disabilities’ with a review of 24/25, one
new project was initiated, and one new project added to the Plan. 
April to June 2025 
April
• A new Pan-Ayrshire Digital and Data Integration Group met for the first time.
This was an action from the Digital and Data Plan and the first priority for the
group is to address network access issues across our shared estate. The
group also discussed opportunities for collaborating around skills development
and improving data sharing. 
June
• Successful implementation of phase 1 our new Care Management System,
Eclipse.   
• Fifth Innovation Event with colleagues from the SSSC talking about their new
resource 23 Things to support your practice and learning in Technology
Enabled Care; SAMH on their Digital Strategy; NHS Ayrshire & Arran on their
202

Page 203

evaluation of AI clinical documentation tools (Heidi and Corti); Edinburgh
Council on their pilot of Magic Notes, the AI note-taking tool designed for social
work that's being rolled out in areas of Ayrshire later this year; and also South
Ayrshire HSCP talking about their use of data and dashboards in evaluating
the quality of external providers. 
The past six months have also seen teams work closely with internal audit to review
the governance and monitoring arrangements for the transformation programme.
There was a deep dive into Brighter Pathways, as an example of a large programme,
TrakCare, as an example of a pan-Ayrshire project with a strong NHS focus, and Blue
Badges, as an example of a smaller project.   
The findings are reported separately. 
Service Updates 
2.10 Health and Community Care 
• ACH & Ailsa Hospital Inpatient Services Review: A site-wide review is
underway to improve efficiency and align spend with budget. Several quick wins
have been delivered in HCC Community Wards, with most medium-term actions
due to commence between late summer 2025 to March 2026. 
• Aids & Adaptations Policy Review: Progress is delayed pending SLA
agreement with Housing Services (draft paper with Housing for review). An
extension to March 2026 is being sought due to this dependency. 
• Analogue to Digital Telecare Switchover: 4,807 installations have been
completed in service users’ homes, including 3,422 in-situ digital units. The call
centre has transitioned to a digital platform, and user migration is now underway. 
• Arran SPOC: Netcall telephony implementation is progressing, with a test
system in place. Completion is now expected by August 2025 following delays due
to infrastructure challenges on the island. 
• Care Packages (Lower Level): Project is nearing completion, with approval of
final recommendations due by end June and implementation planned during July.
Delays were due to staffing and winter pressures. 
• Community Rehab: Three distinct subgroups have identified the work required
to complete this project in a deliberate and considered manner. Given the amount
of work identified, a project extension to May 2026 will be sought. 
• Complex Care Model (Change Fund): This options appraisal project has
concluded successfully, and a closure report will be submitted to the
203

Page 204

Transformation Board. A new project is being scoped based on the preferred
outcome. 
• Day Service Review: The team are now working to implement the preferred
option, as per IJB report in June 2025 (ie. All day services provided by HSCP with
an alternative role around carer support and outreach delivered by a third party). 
• Delayed Discharge & Winter Preparedness: Project has concluded. A
performance framework has been introduced to monitor trends and is analysed
monthly. An annual action plan will support future winter preparedness and has
been embedded in our ‘business as usual’ processes. 
• Enhanced Intermediate Care Team (eICT): The project has now concluded,
pending submission of a closure report to the Transformation Board. 
Improvements include simplified escalation, refined triage roles, and enhanced
documentation and training. A full review of policy and process has also been
undertaken, where it has been concluded that current working practices are fit for
purpose. 
• HomeFirst Strategy: Work has commenced, aligned with the Strategic
Commissioning Plan. This strategy will utilise the needs assessment data used in
that plan, to ensure consistent and joined-up strategic planning across the
partnership. 
• MDTs in Localities: The project has successfully concluded, delivering key
outcomes including improved person-centred care through integrated working,
enhanced efficiency via shared caseloads, better access to specialist input, and
strengthened communication across disciplines—leading to more effective
decision-making and streamlined care pathways. 
• Moving & Handling: The project concluded ahead of schedule, delivering a
number of key achievements including enhanced training for staff, improved risk
assessment processes, and the introduction of QR-coded instructional videos and
RAG-rated user guidance. These initiatives have strengthened staff support,
optimised equipment use and extended good practice to wider services including
providers and carers. 
• OT Service Provision: Project concluded with a reduction in Service Access OT
waiting lists from 812 (May 2024) to 86 (Feb 2025). 
• Podiatry: Project concluded with a 40% reduction in waiting lists (433 in Oct
2024 to 263 in May 2025) and improved triage and referral processes. Waiting
times for new patients reduced from 58 weeks to 4 weeks. 
204

Page 205

• Speech & Language Therapy: The project has now commenced, and a staff
workshop has established a draft project delivery plan, which is currently in the
process of being finalised. 
• Technology First: Progress continues with plans for a central hub at Castleview,
Ardrossan being finalised. Staff training and public engagement are key
components of this project. 
2.11 Children, Families, and Justice 
• Brighter Pathways: Strategic Report detailing the outputs from each of the
workstreams is in development, weekly meetings with the Director are scheduled
to assist with the development of the report.  Scheduled to report to IJB and
Cabinet in September 2025. 
• Supported Accommodation Service: Business Case was presented to the
PSMT on the 3rd of July to develop step down model of care for young people
moving on from care. 
• Service Access; The 2023 Desktop Review has been updated to reflect the
present situation with regards to service delivery. 
• North Ayrshire Children and Young People’s Neurodevelopmental
Specification Implementation Group: The remit of the Group has not been
without challenge; however, through dedicate multi-agency and multi-disciplinary
working, significant progress has been made in relation to non-clinical aspects of
the neurodevelopmental service specification. North Ayrshire benefits from
positive working relationships between services and this has facilitated
constructive discussions and progress in key areas: 
• We understand what supports are available to children and families in North
Ayrshire in relation to NDD.
• Information on supports, including training and advice, has become more
accessible to parents and carers via platforms such as NEST.
• We have a baseline value for confidence and competence in the children’s
services’ workforce in relation to supporting children with known or suspected
NDD and their families and have a plan in place to improve this over the next
year.
• We have proactively sought the views and experiences of parents and carers
in relation to aspects of the service specification and will continue to do so.  In
addition, we have consistently feedback to parents and carers in line with good
practice standards for engagement.
• We understand the journey of the children “meaningfully redirected” from
CAMHS since August 2023 and what supports, if any, these children continue
to access. 
205

Page 206

• NDD Connect Event: Planning meetings have been scheduled into the diary, set
dates for the event have not been agreed at the time of writing, further updates will
be provided accordingly. 
2.12 Mental Health and Learning Disabilities 
• ACH & Ailsa Hospital Inpatient Services Review: A site-wide review is
underway to improve efficiency and align spend with budget.  The PID has been
agreed and a programme board is meeting regularly to monitor progress and share
ideas across Ward groups 
• MAT Standards: all 10 MAT Standards have been rated green by the national
support team.  This is the highest level before a final RAG rating of blue achieved
only by evidence of two years of sustained delivery.  Evaluation and search for
permanent funding for MAT Standard 7 (MAT in Primary Care) continues. 
• Early Intervention in Psychosis Service: development of care pathways, system
set ups and data benchmarks continues in anticipation of service launching.  Some
delays to recruitment have meant a delay to service launch and now working
towards a date of September 2025. 
• Community Wellbeing Services: a third workshop was held to develop
recommendations for an additional £100,000 of savings from this area.  The
recommendations have been drafted and further consultations are ongoing. 
• Learning Disabilities Intensive Support Team: work continues to identify an
alternative solution for the day assessment hub.  A Project Initiation Document has
been agreed with the Scottish Government and Health Improvement Scotland for
the funded test of change. 
• Complex Care Accommodation Requirements: Work is underway with
Housing, Mental Health, CDIS and Learning Disabilities colleagues to accurately
reflect the demand for future housing needs including for supported type models. 
The service are also exploring options within the Ayrshire Central Housing
Development. 
• Review Acute Assessment model (Ward 7A) based at Woodland View: All
reports complete including benchmarking and previous admission analysis.  Ward
has been closed/paused pending review.  Consultation, engagement and research
underway to develop options appraisal allowing the creation of recommendations
for the way forward. 
206

Page 207

• Implementation of Recommendations to Support people with Learning
Disabilities through the entire life course: workplan was approved by the
Transformation Board and Social Work Governance Board.  Short life Working
Groups are being set up to take six pieces of work forward. 
• West Road: the reconfiguration of West Road was completed and officially opened
on 22 May 2025.  The re-opened and refurbished facility will serve the Community
Eating Disorders and Neuro-CAMHS services. 
• Community Eating Disorders Service (CEDS): The previous PID has been
updated to reflect the current circumstances.  Operational solutions have been
identified and a business case for permanent funding is being developed. 
• Digital Transformation: TrakCare Implementation continues with two more
teams live on the system.  A delivery plan to support the Digital Transformation
work in Mental Health is being looked at, this was part of the digital strategy work
in 2024 and part of the original scope still to be delivered.  The Strata system has
is being piloted in a number of areas.
• Psychological Therapies Specification: a self-assessment tool has been
developed to allow mass collection of information from all teams and a test of the
tool is underway with two teams. 
2.13 Partnership-wide 
Eclipse 
The Eclipse social work case management system went live on the 11th June. This
was culmination of a significant effort over many years by the Performance and
Information System Team in collaboration with operational colleagues. The team, with
service support, undertook a substantial final manual migration process to move all
data to the new system and provide the best starting position for all workers. 
The new system provides the functionality that has been at the core of many reviews,
namely reducing system downtime, reducing the bureaucracy of form-filling, providing
outputs that are person and service specific, and, having a modern system that can
integrate with other systems to meet the future requirements of Partnership services. 
The team will continue to support all users over the coming few months to bed-in the
system processes then ease back into a business-as-usual function moving into a
process review, development, reporting, and training cycle. A formal evaluation of the
implementation is planned. 
Workforce Plan 
The Scottish Government Director of Health Workforce issued a letter on 17
December 2024 which advised that it recognised the workload pressure facing NHS
207

Page 208

Boards and HSCPs and difficulty in planning for the workforce in the current
environment, and contained a requirement to complete a reporting template regarding
information about the current workforce. The Interim return was developed by senior
managers and approved by PSMT, and submitted to the Scottish Government on the
17th March. This may mean the Scottish Government is looking at further guidance
nationally. We are now in year 3 of the workforce plan, and work to carry out an
evaluation of the plan and final year three report will commence over the summer to
be completed in October 2024. Work to carry out a revised workforce plan will
commence following the development of a new Strategic Plan and will therefore take
place in 2026. 
The Carer Partnership has achieved the following highlights: 
• North Ayrshire Short Breaks Services Statement published in February 2025
• Carers Champions Board established in January 2025 (monthly meetings in Feb/
March)
• Continued work on Bridgit (digital self-help portal for carers) with Young Carer
section live in March 2025
• Improved process and pathways for offering/ completion of ACSP and YCS -
CGNA completing from March 2025
• Revised YCS engagement and update of assessment paperwork complete
(SWGB April 25).
• Development of Section 28 – Identifying & Involving Carers in Hospital Discharge.
Post recruited in February 2025.
• CGNA aim, role and offer embedded across schools in January 2025.
• Joint Carer Partnership Action Plan compiled. 
The following work is ongoing and of priority for future reporting: 
• Communication and marketing materials - Carer Pack aligned with the self-help
resource/ work is ongoing
• Revised longer term HSCP Carer Strategy with a draft due in the autumn before
submission to the IJB.
• Introduction of an Engagement role with Carers Gateway North Ayrshire (CGNA).
• Increased variety in breaks from caring and improved process in the distribution of
short break funds to carers. Shared Care Short Breaks Funding received has been
almost doubled for 25/ 26 to CGNA to distribute.
• The second annual carers conference driven by what carers need was held during
Carers Week in June at Oscars in Saltcoats. 
Self-Directed Support 
In the past twelve months the following has been achieved:
• An initial desktop review of all policy relating to SDS.
• Several design sessions with a core HSCP project team to identify areas to
progress.
208

Page 209

• A series of individual interviews with a range of senior staff and practitioners across
the Partnership to better understand the future direction of SDS, barriers and
current organisational cultures.
• Service user interviews to capture the difference choice and control makes to
people’s lives as part of the change story for North Ayrshire to be used as case
studies for staff training purposes.
• Three SDS sessions with Team Managers to share progress to date, refresh on
SDS duties and options and ask what improved choice and control could look like
in their service.
• Creation of an overall design brand kit to help make SDS and the options for choice
and control clearer.
• Graphic design work to support related work in other areas such as unpaid carers
and learning disability.
• The design of a new SDS microsite to help people seeking information and support
navigate SDS and provide staff with a space to host resources to support their
practice in relation to options, choice and control.
• Two cohorts of a value-based leadership programme for North Ayrshire staff
creating the space to consider culture and behaviours required to bring about
system level changes.
• Developed the beginnings of a new overarching ethical framework correlating with
the digital resource, and comprising a public value proposition, 7 anchors of great
practice and visible, local stories to bring choice and control to life.
• Drafting of an SDS Policy to advice of duties, local decision making and promote
consistency and best practice across all HSCP services. 
3. PROPOSALS 
3.1 It is proposed that IJB note the progress to date. 
3.2 Anticipated Outcomes 
Informing IJB and the people of North Ayrshire on the progress of the Transformation
Plan, and also providing assurance of the governance arrangements and that the
Transformation Board has appropriate oversight.   
3.3 Measuring Impact 
Stakeholders are assured of progress.   
4. IMPLICATIONS 
4.1 Financial 
A number of the transformation projects will deliver financial savings once they are
fully operational; some financial targets have been identified as part of the budget
development for 2025/26 (reflected in the Medium-Term Financial Outlook). Identified
209

Page 210

savings and overspend reductions are tracked in the online Tracker (screenshot in
Appendix I and exported version in Appendix III) and our online dashboard
(screenshot in Appendix II). 
4.2 Human Resources
None. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
None. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
None. 
5. CONSULTATION 
5.1  Consultation has taken place with Planning Managers in the Transformation Team,
and with the Transformation Board.   
Scott Hunter, Chief Social Work Officer 
scotthunter@north-ayrshire.gov.uk   
8th August 2025   
Appendix 1 – Online tracker 
Appendix 2 – Online dashboard 
210

Page 211

Appendix 1 – Online Tracker (Screenshot)
211

Page 212

Appendix 2 -  Online Dashboard (Screenshot) 
212

Page 213

Integration Joint Board
21st August 2025
Subject : North Ayrshire HSCP Clinical and Care Governance
Report 2024-25
Purpose : This report is presented to IJB Members for :-
• Awareness 
Recommendation : IJB Members are asked to note the contents of the annual Report
2024-25 
Direction Required to
Council, Health Board or
Both
Direction to :- 
1. No Direction Required √
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms
CAMHS Child & Adolescent Mental Health Services
CCGG Clinical Care Governance Group
HSCP Health and Social Care Partnership
IJB Integration Joint Board
NHS AA NHS Ayrshire and Arran
MWC Mental Welfare Commission
NA North Ayrshire 
1. EXECUTIVE SUMMARY
1.1 North Ayrshire HSCP continues to have robust clinical and care governance
arrangements in place to provide high quality care and support for the people in North
Ayrshire. 
1.2 This paper provides an update and overview of governance activity for the period
August 2024 – July 2025 for consideration by the Integration Joint Board (IJB).  The
Annual Report is attached at Appendix 1. 
2. BACKGROUND 
As part of the integration of health and social care services, a National Clinical and
Care Governance Framework was developed. Clinical and Care Governance is the
system in which the HSCP’s are accountable for continuously improving quality and
safeguarding high standards of care. The Partnership has developed Clinical and
Care Governance arrangements in line with the commitments and requirements
contained in the Integration Scheme.
Agenda Item 8
213

Page 214

2.1 The Clinical and Care Governance Group (CCGG) provide assurance to the IJB that: 
• Quality of care, effectiveness and efficiency drives decision-making about the
planning, provision, organisation and management of services
• The planning and delivery of services take full account of the perspective of
patients and service users
• Unacceptable clinical and care practice will be detected and addressed 
The Terms of Reference for the CCGG are included as Appendix 2 of this report. 
The CCGG has a standing agenda that ensures routine consideration of: 
• Public Protection
• Professional Updates
• Heads of Service updates
• Adverse Events
• Complaints/Enquiries
• Inspection Reports/Action Plans/SPSO
• Workforce
• Consultation and Safety Action Notices
• Infection Control and Infection
• Operational Risk Register 
The CCGG has also had specific updates and assurance reports on: 
• Updates to the Strategic Plan
• Ward 7A, Woodland view
• Primary and Urgent Care
• Front Door Service
• Improving Cancer Journey Programme
• MWC Young People Monitoring Report
• KA Leisure Wellbeing Service
• AHP highlight report 
2.2 The Clinical and Care Governance Annual Report provides information on governance
activity under Safe, Effective and Person centred headings. 
The paper provides details on how the CGG delivers on its function to review and
consider operational risk management and escalation, oversight of reporting and
reviewing adverse events within HSCP services including the outcome of significant
adverse event reports. The paper highlights examples of key pieces of work during
this period including activity on a range engagement activity with local communities. 
The paper provides an update on external inspection of NA HSCP services by the
Mental Welfare Commission 
Information on services user feedback through engagement, complaints and
compliments. 
214

Page 215

3. PROPOSALS
3.1 Anticipated Outcomes 
Further meeting dates for the NA HSCP’S CCGG are planned for 2024/25, and
future update reports will be provided to the Integration Joint Board. 
3.2 Measuring Impact 
It is anticipated that through continuous quality improvement and enhanced reporting
structures, the CCGG will ensure services are safe, effective, person-centred and
responsive to the ongoing needs of the population.
4. IMPLICATIONS
4.1 Financial
No financial implications as a result of this paper 
4.2 Human Resources
None as a result of this paper 
4.3 Legal
None as a result of this paper 
4.4 Equality/Socio-Economic
None as a result of this paper 
4.5 Risk
Operational risks are reported to the PSMT and these risks are then remitted to the
Clinical and Care Governance Group.  The Group consider any High or Very High
risks (as defined by the approved risk management strategy) and if required escalate
these to the Partnership Senior Management Team (PSMT) for consideration for
inclusion on the Strategic Risk Register. 
4.6 Community Wealth Building 
None 
4.7 Key Priorities
Over the coming 12 months the NA HSCP CCG will: 
• Review the HIS Clinical Governance standards against local performance and
identify areas of good practice and areas for improvement
• Continue to develop consistent performance measures for health care services
within the partnership to support governance scrutiny and assurance on quality
of patient care.
• Ensure that the NA HSCP Clinical Governance Group considers quality of care,
safety and management of risk as part of discussion on financial recovery over
the coming 12 months.
215

Page 216

4.4 Equality/Socio-Economic
None
5. CONSULTATION 
None 
Caroline Cameron, Director 
For further information please contact Darren Fullarton, Lead Nurse/Associate Nurse
Director 
Appendix 1 – NAHSCP Clinical and Care Governance Group Annual Report 2024/25
Appendix 2 – Clinical and Care Governance Group Terms of Reference 
216

Page 217

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0 
1.    Introduction 
As part of the integration of Health and Social Care services, a National Clinical and Care
Governance Framework was developed. Clinical and Care Governance is the system in which the
Health and Social Care Partnership are accountable for continuously improving quality and
safeguarding high standards of care. The North Ayrshire Health and Social Care Partnership
(HSCP) has developed Clinical and Care Governance arrangements in line with the commitments
and requirements contained in the Integration Scheme. 
The role and function of the North Ayrshire Clinical and Care Governance Group (CCG) is built
upon strong partnership and collaboration and North Ayrshire HSCP continue to provide robust
arrangements for the clinical and care governance of partnership services and wider relevant
provision to deliver on statutory, policy and professional requirements and the achievement of
partnership quality ambitions. 
The CCG is a standing group of the IJB. It is a requirement to submit an annual report on the
activity of the CCG within the Partnership to the IJB and an annual report to the Healthcare
Governance Committee. 
Key Messages 
• The North Ayrshire HSCP continues to have robust clinical and care governance arrangements
in place to provide scrutiny and assurance on quality care and support for the people in North
Ayrshire.
• The partnership continues to face financial challenges in delivering and improving service
within the available budget. 
• The partnership continues to strengthen its approach to engaging with our local communities
to ensure that the design and delivery of service is done in collaboration with those that use
the service.
• The partnership has received positive feedback and learning from independent visits and
inspection. 
• Healthcare Improvement Scotland (HIS) have published and consulted on Clinical Governance
draft standards. Once approved we will measure our local performance against these
standards.
• The increased use of performance measures will support and promote scrutiny and assurance
through the governance framework. 
217

Page 218

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0 
2.   Health and Care Governance Arrangements 
The North Ayrshire Clinical and Care Governance Group Framework: 
The CCGG has a standing agenda that ensures routine consideration of: 
• Public Protection
• Professional Updates
• Heads of Service updates
• Adverse Events
• Complaints/Enquiries
• Inspection Reports/Action Plans/SPSO
• Workforce
• Consultation and Safety Action Notices
• Infection Control and Infection
• Operational Risk Register 
Over the past 12 months the CCGG has also received specific updates and assurance reports
on: 
• Updates to the Strategic Plan
• Ward 7A, Woodland view
• Primary and Urgent Care
• Front Door Service
• Improving Cancer Journey Programme
• MWC Young People Monitoring Report
• KA Leisure Wellbeing Service
• AHP highlight report 
218

Page 219

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
The North Ayrshire Clinical and Care Governance group has met on 5 occasions since August 2024
and the meeting was adjourned on 4 occasions as the group was not quorate. The next NA CCGG is
scheduled for 29th September 2025. The Terms of Reference is included as Appendix 1. 
3.    Safe
Operational Risk Register 
Operational risks are reported to the PSMT and these risks are then remitted to the Clinical and
Care Governance Group.  The Group consider any High or Very High risks (as defined by the
approved risk management strategy) and if required escalate these to the Partnership Senior
Management Team (PSMT) for consideration for inclusion on the Strategic Risk Register. 
The CCG received Operational Risk Register (ORR) updates at the October 2024 meeting and
no items were escalated. 
At the January 2025 meeting the risk in relation to Ward7A was escalated to PSMT resulting in a
new risk being added to the Strategic Risk Register called ‘Growth and expansion of specialist
complex care developments’.  This was subsequently reported to the IJB in March 2025. 
Safety Action Notices 
Safety Action Notices are issued to alert services of concerns/faults that require review from the
area manager for consideration of attention and action: 
# Received
Returns
Within
Timescale
% Returns
Within
Timescale
Returns
Outwith
Timescale
% Returns
Outwith
Timescale
Q4 (Jan-Mar
'25) 3 2 67% 1 33%
Q1 (Apr-Jun
'25) 10 0 0% 6 60%
Q2 (Jul-Sept
'25) 9 4 44% 1 11%      
Total 22 6 27% 8 36% 
43%
57%
Safety Action Notices
2025
Returns within Timeframe
Returns outwith Timeframe 0 2 4 6 8 10 12
Equipment (Medical)
Equipment (Other)
Health & Safety
SAN Themes
219

Page 220

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
Performance in this area will continue to be monitored to ensure improvements in returning
“Responsible manager response and assurance sign off” within timeframes (within 14 working
days) 
3.1  Adverse Events   
Adverse events are reported and investigated on the NHS Datix system. Each adverse event is
reviewed and approved locally with weekly oversight from HSCP and MH Adverse Event review
groups. 
The following chart shows the total number of adverse events reported by all services in North
Ayrshire: 
The total number of adverse events reported in this period was 2979 with incidents of violence
and aggression slips, trips and falls and self-harm/suicide being the top three categories. 
Category Number
Violence/Abuse/Harassment 1242
Slip, Trip or Fall 448
Self Harm / Suicide 436 
Mental Health Services report the most adverse events following by Helath and Community
Care and then Children’s, Families and Justice. 
The Mental Health Adverse Event Review Group (AERG) meets weekly and the North Ayrshire
AERG meets every two weeks to review all incidents reported on Datix within that review period. 
0
200
400
600
800
1000
1200
1400
North H&SCP
01/07/2024 -30/06/2025
Adverse Event Category
220

Page 221

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
MH and North AERG: 
• ensures that the appropriate level of review are undertaken and that all learning from
reviews is shared across appropriate services. 
• outstanding Adverese Event Datix and LMTR trackers are on the weekly agenda with
encouragement to the Senior Managers to review for their service and to udpate with the
RMT. 
Monthly SAER meeting with AND/AMD/RMT and Senior Managers to:
• nominate review teams – this is now from locality management teams and has resulted in
improved timescales
• review outstanding SAER where review team not confirmed
• reiew and discuss and make decisions on any other challenges within SAER process 
The progress of all SAERs is tracked by the AERG coordinator and the review teams attend the
AERG to present on draft reports prior to submission for final approval. At all stages efforts are
made to ensure families are informed and engaged in the SAER process. 
3.2 SAERs and LMTRs 
Since 2019 the number of Significant Adverse Event Reviews (SAER) commissioned for North
Ayrshire HSCP is 85. 
15 new SAER were commissioned in 2024/25 with 9 commissioned since April 2026. 
Of the SAERs commissioned in 2024/25, four of these have been completed with seven overdue
and four on target to be completed. The AERG chairs, supported by the NHS Risk Management
Team, continue to support review team leads to address challenges and barriers to completing
SAERs. There has been significant progress in reducing the number of overdue SAERs over the
past 12 – 18 months. 
The activity on undertaking Significant Adverse Event reviews has increased steadily over the
past 10 years. This is welcome evidence of an ongoing commitment by the organisation to learn
when things do not go well. 
0
2
4
6
8
10
12
14
16
18
19/20 20/21 21/22 22/23 23/24 24/25 25/26
Number of SAERs (year)
221

Page 222

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
Through the MH AERG it is recognised that the framework around SAERs required to be reviewed
and the support in place for senior leads undertaking SAERS considered. Tests of change have
been undertaken to improve on roles and responsibilities: lead reviewers have timeous support
from subject experts, responsibilities including family and staff contacts are shared equally and
time in diary consciously planned to improve capacity to undertake SAER activity. The learning
from this has been shared and implemented in our approach to supporting lead reviewers. 
The Root Cause Analysis Training offered to staff has been reviewed by the NHS Risk
Management Team with a revised training programme set to be introduced in 2025. 
Since 2019 the number of Local Management Team Reviews (LMTRs) commissioned for North
Ayrshire HSCP is 170. 
19 new LMTRs were commissioned in 2024/25 with 8 commissioned since April 2026 
Of the LMTRs commissioned in 2024/25, eight of these have been completed with 11 overdue to
be completed. The AERG chairs, supported by the NHS Risk Management Team, continue to
support review team leads to address challenges and barriers to completing LMTRs. There has
been significant progress in reducing the number of overdue LMTRs over the past 12 – 18
months and work continues to complete overdue LMTRs from 2020/21 (2), 2021/22 (1), 2022/23
(6) and 2023/24 (4). 
3.3 Learning and Improvement 
A review of emerging themes from recommendation and learning from SAERs was undertaken
in 2024 and this identified the following three top themes: 
• Record Keeping
• Communication between service/professional groups
• Communication with family 
A further thematic analysis undertaken in 2025 identified five main themes from SAERs: 
• Care Pathways
0
5
10
15
20
25
30
35
40
45
19/20 20/21 21/22 22/23 23/24 24/25 25/26
Number of LMTR (year)
222

Page 223

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
• Clarity of roles 
• Communication
• Staff Training
• Care Assurance 
There are currently 16 action plans active within North Ayrshire HSCP (mainly mental health
services) as a result of learning and improvements identified within SAERs. 7 Action plans were
closed in 2024/25 with evidence of actions undertaken and completed approved through the
AERG. This year to strengthen the scrutiny and review of action plans and to ensure that activity
to imbed learning in practice, the terms of reference for the Quality and Safe Observation Group
(a sub group of the MH Clinical Development and Governance Group) was recently expanded to
provide consistent governance oversight of learning and action plans from local reviews and from
independent inspections and visits such as HIS and MWC. 
Learning Summaries are developed for all SAER and LMTR reports where required:  
# Received
Returns
Within
Timescale
% Returns
Within
Timescale
Returns
Outwith
Timescale
% Returns
Outwith
Timescale
Q4 (Jan-Mar
'25) 0 0 0% 0 0%
Q1 (Apr-Jun
'25) 11 3 27% 8 73%
Q2 (Jul-Sept
'25) 2 1 50% 1 50%      
Total 13 4 31% 9 69% 
Performance within this area will continue to be reviewed and monitored to ensure improvement
in compliance with timescales. 
31%
69%
Learning Summaries
2025
Returns Within Timescale
Returns Outwith Timescale 0 1 2 3 4
Patient Safety/ Falls
Pressure Ulcer
Death/ Suicide
Documentation/ Communication Issues
Referral/ Treatment Delay
Medication Issues
Learning Summary Themes
223

Page 224

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
4.   Effective
4.1  Key programmes of work
Service User Engagement 
Over the past six months, we have been reviewing our current mental health service engagement
and participation mechanisms with the aim of improving and developing them further. 
During this time, we have created a comprehensive Mental Health Services Framework document.
This outlines our vision, roles, and responsibilities in ensuring that the voices of people with lived
experience and carers are central to shaping the services we provide. 
Key developments include: 
· A new public-facing engagement and participation leaflet, which explains what we mean by
engagement and highlights the many ways individuals can get involved and share their views. 
· A new web page on the NA HSCP website https://www.nahscp.org/mental-health-addiction 
· The creation of a Mental Health Services Engagement and Participation Network, designed to
maintain regular communication with members of the public who are interested in helping shape
our services. 
· A year-round feedback mechanism, allowing people to share their views at any point in their
care or experience journey. 
We are also in the process of establishing carer and lived experience forums and panels. Our first
Carers forum will launch on 30th July and will meet monthly, offering essential information on
mental health carers’ rights, and available support. 
In addition, a development group is currently exploring the creation of a permanent Lived
Experience Panel, which will serve as an ongoing source of insight and guidance for future service
development and review. 
Broader work is underway with clinical teams to create a consistent approach to the collation of
patient and carer experience. Currently this is captured in a variety of ways with no single point of
oversight. 
We are currently working on the development of revised carer and patient experience surveys and
where possible will encourage the collaborative use of similar tools to ensure a consistent
approach that is aligned with national strategy and mental health standards. 
A key area in providing this consistency is the use of Smart Survey. The recommendation involves
all mental health engagement being located centrally using this tool allowing us to centrally
monitor feedback but also for clinical teams to utilise this to create local reports and action plans
that feed into governance structures. To support this, we propose to develop engagement
oversight groups that will be attended by clinical teams, managers, Planning support and QI to
review engagement data quarterly. This new area of development will take 6 – 12 months to
embed and provide enough time to evaluate the effectiveness of the changes proposed.
224

Page 225

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
In addition to the areas of development above, ongoing engagement has continued relating to
many areas of service change and review. This has included public consultations, focus groups
and 1:1 interviews. Within mental health services engagement we also run regular public 
Connect events throughout the year and run the North Ayrshire mental health Arts Festival with
the Mental Health Foundation every October. 
Psychological Services 
Psychological Services remain close to the LDP 90% RTT standard (88% in June 2025) with the
LDP being over 90% for 9 months over the last year. Pressures in particular parts of the service
(CAMHS Psychology and Adult CMHTs) have impacted upon our ability to meet this threshold in
the remaining 3 months over the last year. Requests for Neurodevelopmental Assessments are
putting extra pressures on these services.  Recruitment to vacancies to psychology posts has
become easier over the last year because availability of workforce. Unfortunately, the reason for
this is a reduction in available funding from SG across Scotland. Vacancies in the service have
been recruited to and have ensured that the LDP 90% RTT has been met the majority of the time
over the last year.. Further improvement will require increased capacity in the struggling
specialties. 
Over the last year we have been able to establish a full complement our new leadership structure,
with a new Heads of Specialty for Adult services. 
Psychological services has a new established clinical governance structure with two new Clinical
governance groups which have started in June 2024. The Psychological Therapies and
Interventions CGG chaired by the Director of Psychological services is supporting the
implementation of the National specification for the Delivery of Psychological Therapies and
Interventions (SG Sept 2023). The implementation of the PT specification has been further
progressed over the last year. 
Significant work has been undertaken to ensure that Psychological Services have the structure
and procedures in place to facilitate the requirements of the Safe Staffing Act across all
Psychological Specialties. 
There remains a substantial focus on improvement of data quality and reporting.  Psychological
Services is working closely with data analysts and digital systems leads in order to ensure that we
have data required for service improvement. 
Brighter Pathways update - Strategic Recommendations & Implementation  
Area to be progressed:  
• Develop a Supported Accommodation resource that will support 6 young people leaving
care – April 2026  
• Increase the number of foster carers in North Ayrshire, via transformation of digital
recruitment strategies – Implemented in November 2024 
• Implement new fostering scheme with increased finances to retain current carers and
attract new carers – New fostering scheme implementation April 2026 
• Develop a revised model to provide intensive support to families and children who are at
risk of being accommodated – January 2026 
• Develop a Standard Operating Procedure between Education and HSCP to ensure
shared understanding and transparency between services, supporting more consistent
and equitable funding decisions. September 2025 
225

Page 226

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
• Placement Assurance Forum - scrutiny of all internal and external residential resources.
September 2026 
• Development of a service that provides psychological interventions, support and direct
work to children on edge of care and care experienced young people -TBC 
Service Improvements already implemented 
• Revised Supported Care Scheme – revised scheme to support young people over
sixteen.  
• Unaccompanied Asylum-Seeking Children Practice Guidance/Welcome Booklets 
• Moving on Forum/Tracker – to review and plan transitions for young people moving on
from care settings.  
• Revised Housing Protocol - To ensure a co-ordinated response to the accommodation
and support needs of care leavers.  
• The implementation of a new referral template for intensive support referrals to
Rosemount for children in family-based care.  
• Pilot with Children’s House for psychological consultation to support children and young
people. 
4.2  Quality Improvement Capacity and Capability 
There is a focus on increasing QI capacity and capability through several learning opportunities.
This includes Quality Improvement NHS Education for Scotland (NES) Modules, Ayrshire and
Arran Improvement Foundation Skills Programme (AAIFS) and the national Scottish Improvement
Leadership Programme (SCIL). 
• Over 30 staff have completed the Ayrshire and Arran Improvement Foundation Skills
(AAIFS) programme since its inception.
• 2 staff within mental health have a lead level qualification (SCIL)
• The number of staff who have completed QI NES modules is difficult to identify as the data
is reported organisationally. 
Staff undertaking quality improvement courses are encouraged to present their improvement
journey and celebrate success and learning at celebration events which take place twice a year. 
The Quality Improvement and Innovation Group (QI and I) has witnessed an increased
attendance, with staff joining to share their improvement ideas, feedback on tests of change and
identify where QI support and education can be offered. 
Collaboration between the QI Partnership team and Senior Nurses has encouraged a streamlined,
consistent and improved approach to the co-ordination and delivery of QI support across Mental
Health Services. The QI and I Group are currently looking at whole service projects that can impact
the patient journey experience. These include such projects as: 
• Introducing access to smart devices in a low secure setting to aid patient recovery
• Taking therapy to the home within Perinatal MH
• Cognitive Stimulation Therapy 
226

Page 227

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
4.3 External Inspections of local service
The Mental Welfare Commission (MWC) for Scotland’s mission and purpose is to be a leading
and independent voice in promoting a society where people with mental illness, learning
disabilities, dementia and related conditions are treated fairly, have their rights respected, and
have appropriate support to live the life of their choice. To achieve this mission and purpose the
Commission have identified four strategic priorities: 
• To challenge and to promote change
• Focus on the most vulnerable
• Increase their impact
• Improve their efficiency and effectiveness
Each year the MWC normally visits individuals in hospital, other care settings, and in their own
homes to find out their views and check on their care and treatment. Where appropriate, they
will also speak with friends and relatives. 
The Commission carries out their statutory duties by focussing on five main areas of work:
• Visiting people
• Monitoring the Acts
• Investigations
• Information and advice
• Influencing and challenging 
NHS Ayrshire & Arran alongside their associated Health and Social Care Partnerships are subject
to such visits. 
Between April 2024 and March 2025 the MWC undertook 5 announced visits to services
across Ayrshire & Arran.   
• 3rd July 2024 – Ward 7A, Woodland View
• 10th July 21024 – Ward 6, Woodland view
• 16th August 2024 – Marchburn Ward, EACH
• 25th September 2024 – Wards 9, 10 and 11, Woodland View
• 6th March 2025 – Ward 8, Woodland View 
It is important to note that the structure of the visits are often based on the Commission’s thematic
review of pertinent issues throughout the year. During the past year, the MWC have paid
particular focus on the circumstances of people with learning disability and complex needs
who have been in hospital for 10 years or more and published their thematic report “Hospital
is not home” in January 2025. 
Following each visit ‘hot’ feedback is provided to the clinical site and senior management team.
This is then followed up by a formal written report which is ratified and used as the basis for
remedial work and improvement, as well as recognising positive practice.
Of the 5 announced visits the MWC made recommendations for 3 of these. 
227

Page 228

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
An assurance report was submitted to the NHS Healthcare Governance Committee on the 4th
August provide further detail on the MWC visits, recommendations and action plans and is
included as appendix 2.
Wider inspection activity within the HSCP including reports and recommendations is available through
the Care Inspectorate Publications and statistics website. 
5.   Person-Centred Care 
5.1  Patient Experience - Concerns, Compliments, Complaints, and Feedback 
Gypsy Traveller – Mental Health Literature Engagement Report – August 2024 
•  participants)
• The purpose of this engagement was to gather views on existing mental health and
wellbeing resources and explore the communities’ opinions on the content, length and
graphics of current mental health resources.
• Participants suggested health information should be displayed simple and clear,
resembling child like guides. More Infographics on health flyers and guides were strongly
suggested to combat illiteracy. Suggestions were also made to include the gypsy traveller
flag, and culturally appropriate photos and pictures that respect their lifestyle/ 
Locality Conversations – September 2024 (206 participants) 
• The purpose of this engagement was to gather views on service information and
accessibility across the HSCP. 
• Participants noted Insufficient GP and dental services; difficulty getting appointments and
long waiting lists. There were frustrations with triage procedures and receptionists seen as
“gatekeepers.”. Many complaints about phone system and automated options, and elderly
noted as being particularly challenged by these digital methods.  Cultural needs (e.g.,
requesting a same-gender doctor) sometimes unmet, causing frustration and
misunderstandings. Difficulty accessing mental health services, and multiple reports of
long waiting lists for CAMHS resulting in insufficient support for young people. Claims of
inadequate support for non-crisis situations and perceived lack of follow-up care within this
service. Lack of continuity in staff across HCC and MH services.   
• Some positive experiences with certain healthcare practices and pharmacies were noted.
NHS AA app beneficial for those who are digitally literate, and described as crucial for
some, but hard to navigate for others. 
• Suggestions to Simplify video triage processes and emails; upgrade phone
systems.  Increase availability and flexibility of GP appointments (more face-to-face and
out-of-hours options).  Language line needs to be available at triage stage of GP, not just
in appointment, or translate options. 
Equalities Engagement – September 2024 (206 participants – combines with above locality
engagement)
• The purpose of this engagement was to collect information from equalities groups across
North Ayrshire to inform HSCP equalities outcome plan. Questions were designed to get
on their views of accessing and receiving health and social care services, to discover any
barriers they may face, and find out their suggested improvements. 
• Participants noted reduction in women’s health screenings. Long waiting lists for hearing
aids were noted multiple times, forcing people to pay for private services. Some noted that
228

Page 229

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
when hearing aids were handed into Crosshouse, they were left without being able to hear
for up to a week whilst they were fixed and returned. patient transport services noted as
being unreliable. It was also noted that there is only 1-2 gender clinics in Scotland with
long wating lists, and general insufficient resource and health support for trans people in
the area. It was felt that Doctors often dismiss health concerns for pregnant women as
pregnancy-related, Fear of being misdiagnosed with depression or post-partum issues.
Inadequate resources for children with disabilities or neurodevelopmental disorders were
noted, particularly difficulty accessing prescriptions and specialised care. Across the
engagement many were fearful of understaffing in hospitals and shared experiences of
delayed care. Difficulties with referrals for those with substance problems, particularly
obtaining a CPN.
• There were positive mentions of health visitors and sexual health clinics as they were
praised for their reassurance, responsiveness, and support and provide valuable
information and referrals.
• Suggestions were made to Provide comprehensive information at diagnosis and E
ensure consistent care, counselling, and support post-diagnosis. Additionally, suggestions
to provide general health checks to the gypsy traveller community and signpost to relevant
health services to support identified needs. There was also suggestions to provide training 
to community groups on suicide risk and low-level support and offer health training
sessions, such as defibrillator use. Elderly groups suggested establishing annual well
man’s clinics for comprehensive health check-ups, Including tests for diabetes, PSA, blood
pressure, and other indicators. 
Locality Conversations – Young person Engagement – May 2025 (219 participants)
• The purpose of this engagement was to gather young people’s views on HSCP services
for our Locality Plans and the Children’s services plans. Questions were designed to get
local priorities, uncover where young people look for support and any barriers they face,
and suggestions of service improvement 
• Young people noted long waiting lists for mental health support and not being signposted
to alternative options. Furthermore, they feel they are often dismissed by adults when
raising concerns about their mental health which furthers stigma around the topic.
Neurodiversity was largely raised, with concerns around lack of support and diagnosis.
Young people noted feeling let down, misunderstood and alone. There were huge
concerns of young people accessing substances, without knowledge of lasting health
impacts. 
• Breathing space was noted as being helpful and young people liked being able to access
support anonymously, as well as information on NHS website.
• Young people suggest school staff need more neurodiversity training to better support their
students, as well as updated training on mental health. further suggestions were made to
have accessible routes for young people to find health information in their local area, with
suggestions of school assembly awareness sessions of pathways as well as youth only
clinics/drop in hubs. Young people called for more counsellors and ‘activity based’ mental
health support as opposed to just support in clinical settings. Suggestions were also made
about having support in localities, with difficulties getting to appointments (CAMHS/ physio)
that are based in Irvine when from other localities. 
229

Page 230

North Ayrshire Health and Social Care Partnership Health and Care Governance
Group Annual Report 2024/25 
20250609 HSCP CG Reporting Template v1.0
5.2 Complaints themes 
Final annual report currently being finalised and will be presented to the IJB. This final report will
provide analysis of complaints performance and analysis. However, the following table provides
high level overview of activity: 
Indicator Data
Complaints received (2025) Stage 1
53 closed
3 ongoing (2 overdue)
Stage 2 
42 closed
7 ongoing (within timescales) 
Stage I performance Percentage closed in time 43 (79%) 
Stage 2 performance Percentage closed in time 31 (74%) 
6.    Priorities for forthcoming year 
• Review the HIS Clinical Governance standards against local performance and identify
areas of good practice and areas for improvement
• Continue to develop consistent performance measures for health care services within the
partnership to support governance scrutiny and assurance on quality of patient care.
• Ensure that the NA HSCP Clinical Governance Group considers quality of care, safety
and management of risk as part of discussion on financial recovery over the coming 12
months. 
230

Page 231

NORTH AYRSHIRE
Health and Social Care Partnership
In partnership with
Clinical and Care Governance Group 
Background 
The main purpose of integration is to improve the wellbeing of people who use our health
and social care services, of families, our communities and, in particular, those whose needs
are complex and involve support from across health and social care at the same time.  The
North Ayrshire Health & Social Care Partnership (NAHSCP) Integration Scheme is intended
to achieve the National Health and Wellbeing Outcomes prescribed by the Scottish Ministers
in Regulations under section 5(1) of the Public Bodies (Joint Working) (Scotland) Act 2014
(hereinafter referred to as “the Act”). 
In Annex C of ‘Clinical and Care Governance of Integrated Health and Social Care Services’
(A Scottish Government publication) it contains the following description of clinical and care
governance. 
1. Clinical and care governance is the process by which accountability for the quality of
health and social care is monitored and assured. It should create a culture where
delivery of the highest quality of care and support is understood to be the responsibility
of everyone working in the organisation - built upon partnership and collaboration within
teams and between health and social care professionals and managers. 
2. It is the way by which structures and processes assure Integration Joint Boards, Health
Boards and Local Authorities that this is happening - whilst at the same time
empowering clinical and care staff to contribute to the improvement of quality - making
sure that there is a strong voice of the people and communities who use services. 
3. Clinical and care governance should have a high profile, to ensure that quality of care is
given the highest priority at every level within integrated services. Effective clinical and
care governance will provide assurance to patients, service users, clinical and care staff
and managers, Directors alike that: 
a. Quality of care, effectiveness and efficiency drives decision-making about the
planning, provision, organisation and management of services; 
b. Unacceptable clinical and care practice will be detected and addressed 
4. Effective clinical and care governance is not the sum of all these activities; rather it is
the means by which these activities are brought together into this structured framework
and linked to the corporate agenda of Integration Authorities, NHS Boards and Local
Authorities. 
5. A key purpose of clinical and care governance is to support staff in continuously
improving the quality and safety of care. However, it will also ensure that wherever
possible poor performance is identified and addressed. All health and social care
professionals will remain accountable for their individual clinical and care decisions. 
6. Many clinical and care governance issues will relate to the organisation and
management of services rather than to individual clinical decisions. All aspects of the
work of Integration Authorities, Health Boards and local authorities should be driven by
and designed to support efforts to deliver the best possible quality of health and social
care. Clinical and care governance, however, is principally concerned with those
activities which directly affect the care, treatment and support people receive. 
231

Page 232

NORTH AYRSHIRE
Health and Social Care Partnership
Page 2 of 4 
Terms of Reference 
1.0 Introduction  
The Clinical and Care Governance Group is identified as a sub group of the North
Ayrshire Health and Social Care Partnership, Integration Joint Board (IJB).  The
approved Terms of Reference and information on the composition and frequency of
the group will be considered as an integral part of the standing orders of the Integrated
Joint Board.   
The Group will be known as the Clinical and Care Governance Group of the
Integration Joint Board and will be a sub group of the Integration Joint Board. 
2.0 Remit  
To provide assurance to the IJB as follows:
• On the quality and safety of health and social care partnership services.
• That staff across the Partnership are supported to provide quality services and
are appropriately skilled and registered to discharge their professional
responsibilities.
• That proposed changes in practice, within one professional group, do not
adversely impact upon another profession, and that there is a whole system
approach to improvement.
• That services are able to learn and develop from service user and carer
experiences and that effective mechanisms are in place to do so.
• That self-evaluation and quality assurance mechanisms are in place to inform
improvement.
• That a systematic and proportionate approach to the review of critical incidents,
significant incidents and near misses is embedded in the Partnership; and pan-
Ayrshire where this relates to mental health services.
• That findings of critical incidents, significant events and near misses, locally and
nationally, are considered and used to review and improve practice.
• That services commissioned through registered, third and independent sector
have appropriate contract monitoring arrangements in place and that those
services are delivered to a high standard.
• That medical devices (and where required - devices to support care), that are
used, are sourced and maintained appropriately.
• That appropriate links to Infection Control structures are in place.
• That a learning culture is encouraged and that good practice and success is
shared widely.
• That current Partnership governance structures report into and through the
Clinical & Care Governance Group.
• That practice improvement plans are delivered, as appropriate.
• That all Health and Care arrangements are developed with service users at the
centre.   
3.0 Group Membership  
The Clinical and Care Governance Group will be chaired by the Lead Nurse, on behalf
of the Chief Officer.  The Group will report to the Chief Officer and through the Chief
Officer to the Integration Joint Board.  
232

Page 233

NORTH AYRSHIRE
Health and Social Care Partnership
Page 3 of 4
The Vice Chair of the Group will be the Clinical Director who will cover the meeting in
the Chair’s absence. 
The group will comprise of the following members: 
• Lead Nurse 
• Clinical Director
• Lead Allied Health Professional 
• Chief Social Work Officer 
• Associate Medical Director, Mental Health Services
• Director of Public Health or representative
• Head of Children, Families & Justice Services
• Head of Health and Community Care
• Head of Mental Health 
• Quality Improvement Lead
• Psychology Professional Lead
• Carer Representative 
• Risk Management Representative 
• Governance Representative (NHS) 
Service Users and Carers, Third and Independent sector representation will be sought
via the IJB.  The Chair and members will be appointed by the IJB. Group membership
will be reviewed annually and the first meeting of the year. 
4.0 Quorum 
Four members including two of the professional leads will constitute a quorum.  The
professional leads are:
• Clinical Director
• Lead Nurse 
• Lead Allied Health Professional 
• Chief Social Work Officer 
• Associate Medical Director, Mental Health Services
• Assistant Director of Public Health 
• Clinical Director for Psychological Services 
Members will be asked to identify deputies to attend in their absence however they will
not be included in quorum numbers. 
5.0 Attendance  
The group may co-opt additional advisors as required.   
6.0 Frequency of Meetings  
The Group will meet every 4 weeks.  The Chair may, at any time, convene additional
meetings of the group. 
7.0 Authority  
The group is authorised to investigate any matters which fall within its terms of
reference and obtain external professional advice.  The group may form sub-groups to
233

Page 234

NORTH AYRSHIRE
Health and Social Care Partnership
Page 4 of 4
support its functions.  The group is authorised to seek and obtain any information it
requires from any employee whilst taking account of policy, legal rights and
responsibilities. 
8.0 Duties  
The Group shall be responsible for the oversight of clinical and care governance within
North Ayrshire Health and Social Care Partnership and specifically it will: 
• Consider matters relating to; professional governance relevant to Strategic Plan
development, service user feedback and complaints, standards, education,
learning, continuous improvement and inspection activity.
• Provide advice to the strategic planning group, audit and performance committee
and locality groups within the Council area.  The strategic planning group, audit
and performance committee and locality groups may seek relevant advice directly
from the Group.
• Provide assurance to IJB on the operation of clinical and care governance within
the Health and Social Care Partnership in compliance with relevant national
standards, highlighting problems and action being taken where appropriate.
• When clinical and care governance issues relating to Lead Partnership Services
are being considered, the Clinical and Care Governance Group for the Lead
Partner will obtain input from the Clinical and Care Governance Groups of the
other Health and Social Care Partnerships.
• When Clinical and Care Governance issues relating to Public Health are being
considered, the Clinical and Care Governance Group will obtain input from the
Public Health Governance Group. 
• The Integration Joint Board may seek advice on clinical and care governance
directly from the Clinical and Care Governance Group.  In addition, the
Integration Joint Board may directly take into consideration the professional views
of the professional leads as outlined previously.
• Receive minutes and annual reports from the sub-groups established by the
Clinical and Care Governance Group in order to provide assurance and
accountability.
• The group will monitor and review risks falling within it’s remit. 
9.0 Conduct of Business  
Meetings of the group will be called by the Chair of the group.  The agenda and
supporting papers will be sent to members five working days prior to the date of the
meeting. 
10.0 Reporting Arrangements  
Minutes will be kept of the proceedings of the group and will be circulated in draft
within five working days to the Chair of the meeting and within three working days
thereafter to group members, prior to consideration at a subsequent meeting of the
committee.  The Chair of the group shall provide assurance on the work of the group
and the approved minutes will be submitted to the IJB for information.  The group will
conduct an annual review of its role, function and achievements.  The group will hold a
repository for annual reports from Stakeholder Groups 
234

Page 235

Integration Joint Board 
21 August 2025 
Subject : Annual Performance Report 2024-25
Purpose : For Discussion
Recommendation : Integration Joint Board (IJB) to note the key achievements during
2024-25 and the publication of the Partnership’s Annual
Performance Report 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
ABI Alcohol Brief Intervention
CE4U Care Experience for You
CPO Community Payback Order
DTTO Drug Treatment and Testing Order
HSCP Health and Social Care Partnership
IJB Integration Joint Board
MAPPA Multi Agency Public Protection Arrangements
MINDS Mentoring Individuals for New Destinations and Support
MIST Medication Assisted Treatment Implementation Support Team
MS Multiple Sclerosis
NHS AA NHS Ayrshire and Arran
NADARS North Ayrshire Drug and Alcohol Service
PAC Performance and Audit Committee
PSMT Partnership Senior Management Team
UNCRC United Nation’s Convention on the Rights of the Child 
1. EXECUTIVE SUMMARY 
1.1 Each year the Partnership is required to publish an Annual Performance Report, both
to comply with legislative requirements and to demonstrate the progress made in
working towards strategic priorities and national outcomes. 
1.2  The draft report was provided to the Performance and Audit Committee and the Senior
Management Team in July 2025 and has been published on the Partnership’s website. 
1.3  This covering report highlights some of the key achievements during 2024-25 which
are contained within the Annual Performance Report. 
Agenda Item 9
235

Page 236

2. BACKGROUND 
2.1 Section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014 requires
Partnerships to publish an annual performance report setting out an assessment of
performance in planning and carrying out the integration functions for which they are
responsible. 
2.2 Guidance for Health and Social Care Integration Partnership Performance Reports
(published by the Scottish Government, March 2016) was followed to ensure the
content of our performance report met the requirements. 
2.3 Following the provision of the report to the Performance and Audit Committee and the
Senior Management Team all provided feedback on the report content has been
reflected in the preparation of the final document. 
Performance Highlights 
2.4 The Annual Performance Report demonstrates the ongoing progress made by the
Partnership in delivering against its vision and strategic priorities, as well as the
Scottish Government national health and wellbeing outcomes, children’s and justice
service outcomes and a range of local measures. 
2.5 The report uses case studies throughout to demonstrate some of the performance
highlights. Key highlights against each of the Strategic Priorities are outlined below: 
Provide Early and Effective Support 
• North Ayrshire Drug and Alcohol Service (NADARS) has continued to
demonstrate high levels of performance by meeting national and local standards
and targets.
• Individuals were seen within 3 weeks: Target met no less than 96% of the
time for Alcohol related intervention, and 99% for Drug related intervention
• Individuals were seen within 6 weeks: Target met 100% of the time
• Dirrans Centre Collaboration: Partnered with Ayrshire Hospice to support
people with life-limiting conditions locally.
• Mental Health Unscheduled Care Service: officially launched their new mental
health assessment hub on Friday 13th September. This assessment hub, based
in Woodland View Hospital provides nurse led assessment for a period of up to
72 hours
• Digital Telecare Transition: Achieved Bronze Digital Telecare Implementation
Award, with over 50% of users transitioned to digital-ready alarms.
• This is the third year of North Ayrshire Primary Care Development Manager
working with 11 North Ayrshire GP practices implementing the ‘Providing Welfare
Rights in GP Practices’. At the end of 2024-25; there were 536 referrals
compared to 646 in the previous year (17% decrease); over £3Million generated
for patients and almost £7Million generated within the 3 years.
236

Page 237

Tackle Inequalities 
• Our Learning Disability service delivered its Creative Scotland funded project,
‘What Comes Next’ including sharing the project film and presenting the film as
part of the Scottish Mental Health Arts Festival.
• The Health and Mind project is a new initiative within Woodland View Hospital
funded for 12 months through the Connecting to Care fund (SCVO). The aim of is
to support digital inclusion and engagement work connecting people to digital
services and supports health care needs
• The New Scots ESOL (English for Speakers of Other Languages) Hub
provides lessons Monday to Friday 9am to 12.30pm and welcomed 4 new students
into the class. The hub provides the opportunity for our young people to be part of
a community and also receive ongoing support with any issues and wellbeing.
• Input is an organisation based at Towerlands Community Centre in Irvine that
provides work preparation for people with additional educational needs. The skills
development programme is based on the refurbishment of digital devices, with
trainees learning about computers and their components gaining valuable
employment skills like communication and teamwork and boosting their
confidence.
• North Ayrshire Council is one of three Scottish local authorities that are
collaborating with health experts on ways to improve health and wellbeing for
residents. The partnership will examine ways to strengthen and accelerate actions
that will reduce health inequities for people living in North Ayrshire, Aberdeen City
and South Lanarkshire.
• The Young Carers Covenant was launched by the Carers Trust and the Young
Carers Alliance, setting out a series of outcomes for organisations to work towards
to ensure the life chances of young carers are improved
• Money Matters has had a dedicated Welfare Rights Officer providing advice in
North Ayrshire secondary schools since 2021. The service has been a huge
success and has put more than £1m into the bank accounts of families during this
time 
Enable Communities 
• The Family Centred Wellbeing Service (FCWS) this summer devised and
facilitated a summer programme that ran twice a week for the full summer for our
families. They utilised accessible community resources in every area (for example,
Fairlie beach, Low Green Irvine, Dalry Park, Eglinton Park, Ardeer Beach) and did
free activities for our families to help build their confidence.
• During 2024 to 2025, 171 compliments were received by the Health and Social
Care Partnership relating to the services with 22 out of 156 complaints being
upheld.
• Refugee Festival Scotland is an annual celebration of the contribution refugee
communities make to life in Scotland. This year service users involved with our
Refugee and Resettlement Team were invited by the Salvation Army in Kilbirnie to
prepare a Syrian buffet for an event to celebrate different cultures.
237

Page 238

• The ILF (Independent Living Fund) Scotland Fund fully reopened in April, with
an initial investment of £9 million from the Scottish Government. North Ayrshire
has an allocation of 32 new applications for the first year of reopening, where up
to an extra £330 per week can be accessed per applicant.
• Anam Cara dementia respite centre in Kilbirnie was officially reopened with a
ribbon-cutting ceremony on Tuesday 4th June.  The specialist dementia respite
centre accommodates up to 9 guests aged 60 years or over, offering critical respite
services within single room, en-suite accommodation.
• Scottish Breastfeeding Week is an annual event, which ran from Monday 10
June to Sunday 16 June, which aims to enable new mums/parents to consider
their breastfeeding journey and how they can be supported
• In a groundbreaking achievement, NHS laboratory specimens were successfully
delivered from the island of Arran by drone across the Firth of Clyde. This
innovation, part of Project CAELUS, reduced delivery times from several hours to
just 30 minutes, significantly speeding up diagnostic processes and treatment
decisions.
• The Scottish Centre for Personal Safety provides empowering personal safety
training to vulnerable individuals, organisations and businesses throughout
Scotland. Run entirely by volunteers, it offers empowerment-focussed, trauma-
informed personal safety training for people in North Ayrshire. 
Develop and Support our Workforce 
• The Children and Families Health Team have supported two members of staff to
undertake the Postgraduate Certificate in Child Protection at the University of
Stirling
• As platinum award winners in Investors in People, the Dirrans team were
looking for a different challenge so went forward for a new award from Investors
in people, the ‘We invest in wellbeing’ framework.
• Trindlemoss Day Opportunities was the focus of a recent very positive Care
Inspectorate visit. Feedback noted the sector-leading quality of what was
happening within the service.
• The Health and Social Care Partnership are delighted to advise the launch of a
formal model of support for workers in the creation of a Staff Vicarious Trauma
Service. The Partnership recognises the secondary trauma, stress and burn out,
which can occur when working in a complex human environment with many
moving parts.
• Our first annual Care at Home Manager Development Day took place this year.
This was introduced as a practical support for new and existing managers to
enhance both confidence and skills
• All employees of NAHSCP and our providers can now enjoy a year’s free access
to Holly Health, a mobile app that can support people to make small, achievable
changes that could help boost health and wellbeing
• The winners of the 2024 Partnership Awards were announced at our
‘Promoting Wellbeing Together’ event at the Redburn Community Centre in
Irvine.
238

Page 239

• The LiveWell group have partnered with KA leisure to bring free health checks
to Council employees. 
Improving Mental and Physical Health and Wellbeing 
• The Three Towns Community Shed offers a safe and welcoming space for
anyone over the age of 18 to drop in. The community initiative was launched
recently after bringing together the existing local Men's Shed and recently formed,
She Shed under one banner.
• A report produced by NHS Ayrshire & Arran’s Prevention and Service Support
Team has highlighted the positive impact of Naloxone distribution and use in North
Ayrshire. 1,640 Naloxone kits were handed out in Ayrshire between April 2024 and
March 2025 (741 of which were in North Ayrshire), with 73 lives reported to have
been saved in that time (18 in North Ayrshire).
• The latest inspection report for Montrose House Care Home highlights a number
of positive developments and improvements such as the service receiving a
"Good" rating for both supporting residents' wellbeing and for leadership.
• NHS Ayrshire & Arran, in partnership with Coloplast Ltd, has launched a
successful pilot service to improve the lives of people with multiple sclerosis
(MS). This innovative service focuses on managing neurogenic bladder and bowel
dysfunction
• North Ayrshire's first ever Dementia Connect event was held, bringing together
those living with dementia and their carers to learn more about dementia care and
the supports available. Around 80 people attended the free event at the volunteer
rooms in Irvine.
• North Ayrshire Health and Social Care Partnership hosted a Mental Health and
Wellbeing ‘Connect’ event on Monday 29 April at the Ardeer Community Centre
in Stevenston. The public were invited to come along and chat to the many visiting
support services, browse the stalls and participate in a variety of workshops
focussing on a range of mental health topics 
Children’s and Justice Outcomes 
• Our transformation programme to improve outcomes and opportunities for care
experienced children and young people in North Ayrshire is now under way. The
Brighter Pathways Programme Board was set up to look at how services can
be delivered differently to ensure care experienced children and young people
have access to the appropriate resources and supports into adulthood.
• The annual Promise Conference was held in December and saw 73 young
people from across our Secondary Schools join for a day of connection.
• In December, the HSCP received notification from the Scottish Government that
the Delivering Equally Safe Fund would provide a further 12 months funding to
allow us to continue to develop our approach to providing crucial support to
survivors of violence against Woman and their children.
• This year the United Nation’s Convention on the Rights of the Child (UNCRC)
was fully incorporated into Scots Law. Using the Improvement Service’s Getting
239

Page 240

Ready for UNCRC Incorporation Framework document, a benchmarking
document was developed to support our work within the HSCP.
• We saw the launch of a brand-new free mobile app called ‘CE4U’ (Care
Experience for You), the mobile app for iPhone and Android has been designed
specifically for care experienced young people
• Multi Agency Public Protection Arrangements (MAPPA) are a set of statutory
arrangements that allow for the assessment and management of the risk posed by
people convicted of certain sexual and violent offences. The creation of an
effective Risk Management Plan is the key factor in the MAPPA process. To
support staff, In June of this year, subject matter experts from the Risk
Management Authority Scotland provided training on the best ways to develop risk
management plans.
• The Drug Treatment and Testing Order (DTTO) Team have been working in
partnership with MINDS of Recovery to deliver a bespoke four-week bite-sized
recovery group to service users on a DTTO community sentence. Mentoring
Individuals for New Destinations and Support (MINDS) recovery group
explores the CHIME (Connectedness, Hope and optimism about future, Identity,
Meaning in life and Empowerment dimensions) model of recovery, recovery
capitals and the language of recovery
• Latest Government statistics on Community Payback Orders (CPOs) (2023 to
2024) show that North Ayrshire had the highest of the Ayrshires with 479 CPOs
however we have continuously over-achieved against targets for CPO level 1 and
level 2. During 2024-25 78 out of 79 (98.7%) level 1 CPO’s completing within
timescales and 108 out of 112 (96.4%) level 2 CPO’s completing within timescales.
The target for CPO Level 1 is 57% and for CPO Level 2 is 67%. 
Mental Health Lead Partnership 
• A new facility at West Road for Neuro CAMHS and Community Eating Disorder
Service (CEDS) will result in an improved environment to carry out physical
examinations and improve the wellbeing for patients and staff in the facility. Final
building works were completed by the end of the year with plans to open during
2025.
• The Medication Assisted Treatment Implementation Support Team (MIST)
has awarded North Ayrshire HSCP all green and provisional green in their
benchmarking report for all partnerships. This is the highest level attainable in the
implementation which supports the Scottish Drug Deaths Taskforce’s aim to have
no barriers to accessing treatment and care that supports an individual’s recovery. 
• NHS Ayrshire & Arran has officially opened a new, nurse-led Mental Health
Unscheduled Care Assessment Hub. Recognised as the first of its kind in
Scotland, the hub aims to deliver a new model of care of a patient-focused,
therapeutic space to support the delivery of compassionate care to those
individuals with acute mental illness.
• The North Ayrshire Wellbeing & Recovery College won the ‘Best Mental Health
Support Service’ at the Mental Health and Wellbeing Scotland Awards 2025. The
240

Page 241

category celebrates organisations that provide exceptional help to individuals
through their daily actions and activities 
2.6 The report concludes with information on the important role played by Locality
Planning Forums as a key conduit between local communities and the Partnership,
the transformation programme and financial performance. 
Publication 
2.7 This annual performance report is part of a suite of partnership public-facing
documents. These documents are available from the NAHSCP web site. 
3. PROPOSALS 
3.1 It is proposed that IJB notes the key achievements during 2024-25 and the publication
of the Annual Performance Report on the Partnership’s website. 
3.2 Anticipated Outcomes 
Informing the people of North Ayrshire and wider stakeholders on the progress of
health and social care integration, specifically relating to: 
• Outcomes for local people. 
• Locality health and social care needs. 
• Service provision (including lead partnership responsibilities and
commissioned services) 
• Transformational Change. 
• Budget and financial information 
3.3 Measuring Impact 
With the publication of the Annual Performance Report 2024-25 the Partnership has
met its obligations under the Public Bodies (Joint Working) (Scotland) Act 2014. 
4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None
4.5 Risk
None
4.6 Community Wealth Building
None
241

Page 242

4.7 Key Priorities 
This would ensure we fulfil our obligations in the Integration Scheme. 
5. CONSULTATION 
Consultation has taken place with staff, partnership stakeholders, the Partnership
Senior Management Team (PSMT) and the IJB Performance and Audit Committee
(PAC). 
Caroline Cameron, Director 
Neil McLaughlin, Manager Performance and Information Systems,
nmclaughlin@north-ayrshire.gov.uk 
Appendices
North Ayrshire Health and Social Care Partnership Annual Performance Report 2024-25
242

Page 243

North Ayrshire Health and Social Care Partnership 
Annual Performance Report
2024 to 2025 
243

Page 244

Reflections from the Director
Welcome to our Annual Performance Report for 2024 to 2025. This report focusses on the
performance of services during another challenging year for our communities and health and social
care services. Our services continued to face pressures over the period, with growing demand and
individuals requiring more support. Despite these challenges there have been many significant
achievements, and these are outlined in this report
The year 2024 to 2025 is the third year of our Strategic Plan 2022-2030, ‘Caring Together’. Through
delivery of this plan, we continue to strive for a North Ayrshire where everyone can live a safe,
healthy, and active life. Working together, we can develop a vibrant and proactive health and social
care service, that is adaptable to the changing needs and demands of North Ayrshire and provide our
communities with the right service at the right time. 
Health and Social Care services across Scotland face increasing pressures in a context of resource
limitations, we face challenges in North Ayrshire in meeting the specific needs of our population who
face acute challenges with poverty and deprivation, poorer healthy life expectancy and with some
living in remote and rural areas.  The IJB will continue to face significant challenges in being able to
resource and finance the services which are required to meet those needs and improve outcomes for
our communities.  Our North Ayrshire partnership being a key partner in the Collaboration for Health
Equity in Scotland pilot for the next two years will ensure partners work together on these challenges
to maximise resources and promote and secure better outcomes for residents.
We remain ambitious in how we want to change and modernise our services and will focus on the
integration of services to deliver real change to the way services are being provided. Our
transformation programme will focus on service redesign to align future service models to strategic
priorities and our reducing resources, maximising on the opportunities that our highly skilled and
experienced workforce and digital opportunities present.
In conclusion, I want to acknowledge the tremendous efforts of staff across the Health and Social
Care Partnership who have been under immense pressure for a sustained period, whilst continuing to
deliver services with professionalism and dedication. I look forward to the next twelve months with
optimism and know that we will continue to work with our partners to meet the needs of our
communities. 
244

Page 245

3 
Contents 
Annual Performance Report 2024 to 2025 ........................................................................................... 1
Reflections from the Director ............................................................................................................. 2
Visions, Values and Priorities ............................................................................................................ 4
Our Local Priorities ........................................................................................................................... 5
Structure of this report ...................................................................................................................... 6
Provide Early and Effective Support ................................................................................................. 7
Tackle Inequalities .......................................................................................................................... 15
Enable Communities ....................................................................................................................... 22
Develop and Support Our Workforce .............................................................................................. 31
Improve Mental and Physical Health and Wellbeing ....................................................................... 38
National Health and Wellbeing Indicators ....................................................................................... 47
Performance in relation to the three Children’s Outcomes and three Justice Service Outcomes ... 50
Children’s Outcomes ................................................................................................................... 51
Justice Outcomes ........................................................................................................................ 54
Reporting on localities ..................................................................................................................... 63
Transformation Programme ............................................................................................................ 69
Reporting on lead partnership responsibility ................................................................................... 79
Mental Health Services ................................................................................................................ 80
Child Health Services .................................................................................................................. 84
Inspection of service ....................................................................................................................... 88
Financial performance and best value ............................................................................................ 93
Appendix ......................................................................................................................................... 99 
245

Page 246

4 
Visions, Values and Priorities
North Ayrshire Health and Social Care Partnership (NAHSCP/the Partnership) is working towards a
vision where:
“All people who live in North Ayrshire are able to have a safe,
healthy and active life.” 
Our Partnership includes health and social care services within Health and Community Care
Services (H&CC), Mental Health and Learning Disability Services and Children, Families and
Justice Services. 
In this annual performance report, we look back on the progress we have made, share some of our
successes and reflect on some areas that have proved challenging.
This report aligns with our “Caring Together” Strategic Commissioning Plan 2022-2030. This is the
first time the Health and Social Care Partnership has set out such a long-term plan for how we intend
to improve services and the health and wellbeing of the local community. The plan set out our
pandemic recovery intentions, as well as offering a longer-term vision for local health and social care
services. 
Over the period of this strategic plan, the Health and Social Care Partnership will seek to: 
We see these priorities as interlinked, and we expect that where we see success against one priority,
it’s effect will positively impact against others.
People who use our services and North Ayrshire residents will experience our Partnership values in
the way our staff and volunteers engage with you and how we behave. We will treat you with: 
246

Page 247

5 
Local Priorities
The themes of the strategic plan are how the HSCP will plan services and seek positive outcomes
across the whole of North Ayrshire, but each community within North Ayrshire will have unique
challenges and different inequalities. As such, the HSCP is required to develop planning in a smaller
geographic area for different localities, which in North Ayrshire are:
• Arran
• Garnock Valley
• Irvine
• Kilwinning
• North Coast and Cumbrae, and
• Three Towns 
The HSCP previously had in place Locality Planning Forums, which brought together officers working
in each locality to discuss local issues, however these were interrupted during the pandemic. In 2024,
the Locality Planning Process was revised to ensure greater community engagement and
participation in the planning process, and a more robust data element, in order to develop Locality
Plans. These plans are being developed over a 2-year process, to analyse local data, engagement,
and service information, and ensure continued community feedback and leadership to develop
robust, informed plans. This process is currently at the halfway point, with two periods of engagement
carried out last year and two further periods planned for this year.  
247

Page 248

6 
Structure of this report
We have measured and evaluated our performance in relation to:
• Partnership Strategic Objectives
• Scottish Government National Health and Well-being Outcomes 
• Children’s and Justice Services Outcomes 
• Local measures 
The North Ayrshire Health and Social Care Partnership continues to have lead
partnership responsibilities across Ayrshire and Arran for Mental Health and Learning
Disability Services as well as Child Health Services (including immunisation and infant
feeding). We have reflected on some of the highlights and challenges of leading these
services across Ayrshire.
We will show that all our services (those provided by our Partnership staff and those
provided by other organisations on our behalf) are providing high quality care and
support to the people of North Ayrshire.
Finally, the partnership continues to face financial challenges in delivering and
improving services from within the available budget, during the year we have made
significant progress towards achieving financial balance and overall service
sustainability. We have detailed our financial position and reflected on how we
continue to provide assurance that we are delivering Best Value in North Ayrshire for
Health and Social Care services.
248

Page 249

7 
Provide Early and Effective Support
National Outcomes 
1 People are able to look after and improve their own health and wellbeing and live in
good health for longer.
2 People, including those with disabilities or long-term conditions, or who are frail, are
able to live, as far as reasonably practicable, independently and at home or in a
homely setting in their community.
3 Health and social care services contribute to reducing health inequalities. 
249

Page 250

8 
1.1 The Partnership’s Executive Team with the NHSAA Chief Executive and NHSAA Board
members visited the staff and teams on Arran to receive an annual face to face update on
progress. They toured the Emergency Department of Arran War Memorial Hospital and met
with some of our new Emergency Department Nurse Practitioners. The Team heard about
plans to develop the Single Point of Contact on Arran
and had a demonstration of the Netcall telephone
system in the GP practice. This telephone system
allows digital triage of patient requests so they are
automatically connected to the right service, at the
right time. The IT Infrastructure work to enable the roll
out of Netcall across the hospital is currently
underway and is anticipated to be completed during
2025. The members also heard about the excellent
national primary care survey results for Arran, which
showed higher levels of patient satisfaction than other
areas of Scotland. 
The Arran team have recently been joined by a new Activity Coordinator, who is based in the
islands Care Home, Montrose House. This role has been developed, in recognition of
feedback from staff, residents and from formal regulatory inspection. A key function of the role
is to develop person centred activities for residents, to enhance daily outcomes and
experiences and to support and maintain both physical and mental wellbeing. The Care
Inspectorate commended the implementation of this role at our most recent inspection and
noted the boost it has given to the quality of social stimulation and range of activities enjoyed
by our residents both inside and outside of the home. 
1.2 To enhance our adult support and protection arrangements after a recent North Ayrshire
Inspection, an Improvement Plan is in place. This plan describes the strategic response to
the Care Inspectorate’s recommendations. The Partnership has prioritised improvements
in Advocacy services, commissioning a new Advocacy Service, launched in April 2024. The
service is subject to ongoing monitoring particularly around the numbers of referrals being
made for adults who have been identified as being at risk of harm.
Although not explicitly listed in the improvement plan, the inspection report highlighted
additional areas for enhancement which we are actioning in Health and Community Care.
These include:
• Refining chronologies
• Advancing the ASP escalation protocol
• Developing ASP training for Team Managers
• Informing adults that they have been referred as an ‘adult at risk of harm’ and supported
to engage as fully as possible in the process
• Documenting reasons when adults do not attend their ASP Case Conference
• Extending invitations to police and health officials to case conferences when beneficial
• Establishing a multi-agency high-risk screening group
250

Page 251

9 
We maintain an ongoing collaboration with the Care Inspectorate and convene quarterly
meetings to ensure the effectiveness of our improvement initiatives and to jointly monitor the
Partnership’s progress.
1.3 The North Ayrshire Drug and Alcohol Service (NADARS) has continued to demonstrate
high levels of performance by meeting national and local standards and targets, such as
access to treatment waiting times, provision of alcohol brief interventions (ABIs), the roll-out of
Naloxone supplies and increasing patient choice regarding Opiate Substitution Therapy (OST)
medications.
Figures for those seen within 3 weeks for Alcohol were no lower than 96% during any quarter,
while those seen within 3 weeks for Drugs were no lower than 99% during any quarter in 2024
to 2025. 100% of referrals for Alcohol and Drugs were seen within 6 weeks. 
The team continues to identify new ways of working to provide a more agile and streamlined
service and further improve performance. This work has been evidenced by the delivery of
early intervention services in the delivery of Alcohol Brief Interventions (ABI) in both priority
(Primary Care, A&E and Antenatal) and wider settings.  
251

Page 252

10 
1.4 The Dirrans Centre has been participating in a collaboration with the Ayrshire Hospice Living
Well Service since June 2024. This collaboration was created to support the development of a
Living Well Service within North Ayrshire. North Ayrshire residents looking to access the
service previously required to travel to one of the three bases within East and South Ayrshire
which presented some difficulties for North Ayrshire residents due to transport difficulties.
The Dirrans Centre offered the use of the lounge and multi-purpose space to the Living Well
Service with a view to working towards a collaborative approach to supporting individuals with
long term, life limiting conditions within North Ayrshire. The Living Well Service in North
Ayrshire runs every Tuesday afternoon and has a focus on promoting healthy living and
enhancing quality of life.
1.5 The Mental Health Unscheduled Care Service officially launched their new mental health
assessment hub on Friday 13th September. This assessment hub, based in Woodland View
Hospital provides nurse led assessment for a period of up to 72 hours, allowing intensive input
to consider longer term mental health and support needs.
1.6 We are delighted to announce that North Ayrshire Health and Social Care Partnership (HSCP)
was awarded the Bronze Digital Telecare Implementation Award in recognition of the
progress made on our analogue to digital telecare transition project.
To achieve Bronze status, a Telecare Service Provider must have successfully deployed
digital-ready alarm devices to at least 50% of all dispersed and group alarm users. This is the
first major milestone in the transition to digital telecare and sets the foundations upon which
the rest of the digital telecare transition will rest.
North Ayrshire HSCP has been preparing for the analogue to digital switchover for a few years
now. In 2022, a project board was set up and the project team recruited in early 2023. There
have been many challenges along the way including equipment shortages, procurement
obstacles and a tender for a call receiving partner to overcome. It is hoped that the remainder
of the equipment rollout will be straightforward, with a new aim to achieve Silver status. The
team are on course to have the project completed during 2025.
Kevin Queenan, TEC Lead, said: “We’re delighted to have achieved our Bronze Award. Our
technicians are very knowledgeable and a pleasure to work with, and our fantastic
Indicator 2022-23 2023-24 2024-25
Target set by Scottish Government – Priority Settings  3,420 3,420 3,420
Total ABI delivery in Priority Settings (Ayrshire & Arran) 4,933 6,398 5,940
Indicator 2022-23 2023-24 2024-25
Target set by Scottish Government in Wider Settings  855 855 855
Total ABI delivery in Wider Settings (Ayrshire & Arran) 1,207 1,216 1,325
252

Page 253

11 
management and project board have supported us throughout – keeping us on the right path
as digital is new to all of us”.
Alan Boyle, Digital Technician, said: “We’re enjoying the role, it’s great to learn new
technologies and rewarding to know that we’re keeping our service users safe”.
Achieving this Award is a significant achievement and once the rollout of equipment is
completed, North Ayrshire HSCP will move towards the first phase of testing with alarms and
peripherals.
1.7 North Ayrshire Alcohol & Drug
Partnership (ADP) welcomed 70 young
people from across our secondary
schools to take part in the first ADP
Young Person’s event. Two alcohol
and drug education days were also
facilitated at Arran High School in June
2024 where 250 young people engaged
in the events.
The aim was to engage young people
and listen to them about their
experience of alcohol and drugs
education and how it can be improved.
The event was facilitated by multi-
agency partners and included speakers with lived experience and active workshops for young
people to develop knowledge and capture their views and voice. 
Workshops included the Lived Experience Workshop, Stigma Workshop, Myth Busting
Workshop and Future Learning Workshop. The ADP tailored separate workshops to Arran as
there are different complexities for the island. This included the addition of sessions in
smoking/vaping, emergency first aid, and KA Leisure Champions for Change workshops. 
Young People got a lot out of these sessions, feedback included:
“Very interesting to see how others assumed people were taking drugs because of their
appearance.”
“It was interesting hearing about a real-life story and how it affects someone.”
“(Voice of lived experience) made it seem more real as it was someone’s life, not just
statistics.”
1.8 In 2022, the Scottish Government created the £500 million Whole Family Wellbeing Fund
(WFWF) for the life of the current parliament (2022 to 2026) to facilitate the delivery of holistic
family support, with the expectation this will reduce inequalities in family wellbeing, lessen
requirements for family crisis intervention and decrease the number of children and young
people living away from their families.
The Fund is now in year three of the four-year implementation period. There are a total of 16
projects and services in North Ayrshire that have benefitted from WFWF including, Family
Centred Wellbeing Service, Dads Worker, Barnardos Stronger Families and Helping Hands.
253

Page 254

12 
Seven projects are Third Sector projects, six are NAC/HSCP projects while 3 are independent
projects.
1.9 Prevent is a strand of the UK Government’s Counter-Terrorist Strategy that aims to reduce the
threat to the UK by stopping people from becoming terrorists or supporting terrorism. It is
about preventative action and is focused on the early stages where a crime has not yet been
committed.
Local authorities, Health and Social Care Partnerships, the NHS, colleges/universities, prisons
and the Police all have a duty to protect vulnerable individuals and work together to stop them
from being exploited and radicalised.
The North Ayrshire Prevent group was created several years ago and continues to meet on a
monthly basis with regular attendance from representatives from a range of partner agencies
including the Health and Social Care Partnership, Housing, Education, Connected
Communities, Legal Services, NHS Ayrshire and Arran, Police Scotland and the Prevent
Delivery Unit. 
The North Prevent group in conjunction with The Safeguarding and Vulnerabilities Team, the
Prevent Delivery Unit and the Ayrshire Counter Terrorism Liaison Officer, continue to share
knowledge and develop best practice to support those vulnerable to being exploited and
radicalised.
In order to support our workforce, develop their understanding and improve practice in this
area, a variety of training was accessed throughout Quarter 3. This included Extreme
Ideologies Training which allowed practitioners to broaden their knowledge and understanding
of Extreme Right-Wing ideologies, Islamist ideologies and concerns categorised under
Emerging Extremist ideologies. This training was delivered by academic experts in these
areas. In addition, a training session was also provided in Trauma, Adversity and Violent
(TAVE) extremism, this training session focused on the overlap between trauma, experiences
of trauma and involvement in violent extremism. 
1.10 Recovery Across Mental Health (RAMH) North Ayrshire Wellbeing & Recovery College
brought the community together in December to enjoy its latest pop-up pantomime. The
performance at South Beach Baptist Church in Saltcoats was the culmination of a five-week
project, with Moxie productions supporting students to explore drama and performance skills. 
Together, they crafted a fresh and
meaningful spin on the classic tale Snow
White, embedding a thoughtful mental
health message with the humour and
energy of a traditional panto. What made
the event even more special was its ‘pop-
up’ nature. Although students participated
in designing the story and characters, they
only received their scripts and began
rehearsing on the morning of the
performance!
254

Page 255

13 
Recovery College Coordinator Lainey McKinlay praised the participants, saying: “The
confidence and bravery to stand on the stage, putting themselves out there, is remarkable.
The growth in these students since they began with the college is a privilege to witness.” 
The pop-up pantomime highlights the transformative work of the Recovery College, which
focusses on supporting students to self-manage their mental health and wellbeing by blending
creativity, self-expression and mental health awareness to provide a powerful platform for
growth, recovery and connection.
1.11 Break the Silence is a local charity providing professional counselling support in East and
North Ayrshire for those affected by childhood sexual trauma, as well as their partners and
family members. Break the Silence has recently secured re-accreditation from the British
Association of Counselling and Psychotherapy. This fantastic achievement demonstrates that
the service continues to offer an accountable, ethical, professional and responsive service to
clients, staff, volunteers and stakeholders. 
The charity has also recently launched a new self-help tool, which offers advice and resources
for service users while they wait to gain access to the counselling service, including an
overview of what they can expect from the service, access to a survivor’s guide, relaxing audio
and video resources. Referrals can be made for North or East Ayrshire residents of all
genders, aged 18 years and over, via the Break the Silence website, where individuals can
also self-refer.
1.12 The North Ayrshire Primary Care Development Manager worked successfully with 11 North
Ayrshire GP practises, selected by the Scottish Government Improvement Service and HSCP
Money Matters team, to implement the ‘Providing Welfare Rights in GP Practices’. The
initiative saw Income Advisors based in these practices, who worked with patients and
residents to carry out complete benefits checks, help them make claims and support them if
they were disputing claims. Year 3 of the pilot resulted in: 
• 536 referrals to the service (compared to 646 in the second year, 17% decrease)
• £3,126,685.18 has been generated for patients and residents of North Ayrshire in the
Third year of the Project with a total £6,979,573.24 since project commenced in 2022 to
2023
1.13 Case Study: Dementia Support Service
The Partnership’s Dementia Support Service have provided information regarding a recent
interaction they had when supporting a lady in North Ayrshire.
Mrs Y had no family, had recently lost her husband and was experiencing cognitive
impairment. She was referred to Dementia Support for social stimulation as she was feeling
isolated.
Mrs Y was initially hesitant to accept that support, believing that she “did not need anyone”
and noting that she “would not be told what to do”. The team took time to explain the service to
her, offering continual reassurance that she would remain in control of her situation. She would
receive a full explanation of why the suggested support would be beneficial and thereafter
would dictate what, and when, support was delivered. She tentatively agreed to a trial. 
255

Page 256

14 
Our skilled support workers developed a bespoke support plan for Mrs Y. The approach was
predicated on engaging Mrs Y in dialogues about her emotions and memories, including the
sorrow of losing her husband and the pangs of separation from her extended family due to
health constraints. Gradually, Mrs Y’s trust in the support system solidified. Now, she actively
and joyfully engages with the support services, often indulging in fond recollections of her
formative years and cherished childhood anecdotes.
National Indicators 
Indicator NAHSCP Scotland
Adults able to look after their health very well or quite well 89% 91%
Adults supported at home who agreed that they are
supported to live as independently as possible 67% 72%
Adults supported at home who agreed that they had a say
in how their help, care or support was provided 51% 60%
Rate of Emergency Hospital Admissions for adults (Per
100,000 population) 15,142 11,559
Rate of emergency bed days for adults 155,896 113,627
Falls rate per 1,000 population aged 65+ 23.0 22.5
256

Page 257

15 
Tackle Inequalities
National Outcomes 
3 People who use health and social care services have positive experiences of those
services, and have their dignity respected.
4 Health and social care services are centred on helping to maintain or improve the
quality of life of people who use those services.
5 Health and social care services contribute to reducing health inequalities.
6 People who provide unpaid care are supported to look after their own health and
wellbeing. Including to reduce any negative impact of their caring role on their own
health and wellbeing. 
257

Page 258

16 
2.1 The Learning Disability service has delivered its Creative Scotland funded project, ‘What
Comes Next’ including sharing the project film and involving clients in a panel discussion
within the Accessible Book and Storytelling Festival in Edinburgh; and presenting the film as
part of the Scottish Mental Health Arts Festival. The service has also been identified as a
delivery partner by Scottish Commission for Learning Disability (SCLD) with regard to a
Scottish Government funded project looking at Digital Inclusion.
2.2 North Ayrshire Council has been awarded by charity ‘The Smallest Things’ with the nationally
recognised ‘Employer with a Heart’ charter mark. The change in the Council’s Maternity
Scheme has been made to support employees affected by premature birth.
Parents – employed by North Ayrshire Council – of babies born at or before 37 weeks will be
entitled to receive an extra week’s Premature Baby Leave and Premature Baby Pay for every
week until their babies original due date. The leave entitlement will be added to the end of the
employee’s agreed Maternity leave period after the Maternity Leave entitlement has elapsed.
Once the employee has ended their maternity leave, they will then move to the premature
baby leave/pay. This leave will be paid at full pay.
Fiona Walker, Head of Service for People and ICT, shares: “I am delighted that the Council
has received the ‘Employer with a Heart’ Charter status. “It is vital as one of North Ayrshire’s
largest employers that we help employees and local families who may be dealing with the
premature birth of their baby.
2.3 This summer, the thought-provoking How We
See Ourselves exhibition ran at the Garrison
House in Millport, featuring the work of a
talented group of customers from Trindlemoss
and members of Neighbourhood Networks.
‘How We See Ourselves’ used poetry, visual
art and animation to move the lives, interests,
talents and challenges of people with learning
disabilities – as well as those who support
them – from being a marginal conversation
within communities to a central focus. The
exhibition provided a multi-media invitation for
us all to pause and ask ‘how we see ourselves’ as individuals and as a collective, as well as
reflecting on inclusion in its broadest sense. 
2.4 The Health and Mind project is a new initiative within Woodland View Hospital funded for 12
months through the Connecting to Care fund (SCVO). The aim of this funding is to support
digital inclusion and engagement work which aims to connect people to digital services and
supports for health care needs.
The Health and Mind project has been a collaborative project involving development and
support from a number of teams across NHS Ayrshire and Arran, North Ayrshire Health &
Social Care Partnership and The Ayrshire Community Trust (TACT).
The Health and Mind project involves trained volunteers coordinated and supervised by the
TACT team and clinical staff to provide digital support sessions to current in patients within
Woodland View on a Tuesday morning and Thursday afternoon.
258

Page 259

17 
As part of the funding, ward areas have been provided with devices to support the learning of
service users in-between sessions using agreed resources built into devices for ease of
access.
Devices can be provided free of charge to service users if identified as needed to engage with
the project.
This project has been supported by the National Digital Health and Care team along with
training being provided to volunteers and staff through the Mhor Collective.
2.5 The Kilbirnie Family Care team hosted a well-attended community ‘Back to School’ event in
August at the Garnock Valley/North Coast locality area centre. As well as enjoying arts and
crafts, biscuit making, hotdogs, drinks and snacks, families were able to choose from a range
of pre-loved school uniforms, schoolbags, lunchboxes and pencil cases. 
Stationery supplies and free haircuts were also on offer, with one parent saying: “I haven’t
been able to get my girls’ hair cut for a long time.”
2.6 The New Scots ESOL (English for Speakers of Other Languages) Hub provides lessons
Monday to Friday 9am to 12.30pm. We have welcomed 4 new students into our class and they
have integrated well bringing the number of
students to 11. The class is currently working
at SQA National 3 ESOL level, which is
equivalent to A2 of the Common European
Framework of Reference. Students are making
excellent progress in all areas of their English
skills, reading, writing, listening, and speaking.
We plan to achieve a National 3 ESOL
qualification for each pupil and support them
on to a positive destination while taking into
account their asylum status and their ongoing
legal proceedings. The New Scots ESOL Hub
is more than just English lessons. It provides
the opportunity for our young people to be part of a community. They also receive ongoing
support with any issues and wellbeing while two sessions of sport are provided per week.
2.7 Teams from across NAHSCP once again helped to spread some festive cheer among
service users in the lead up to the holidays.
The Three Towns Children and Families team once again
had great success in raising funds throughout the year to
provide Christmas dinner packs and children’s gifts for
families in need throughout the Three Towns locality. 
The Garnock Valley Family Care Team ran a successful toy
appeal and hosted a well-attended open day at the Kilbirnie
Area Office, where over fifty of the families they work with
came along and received some toys and food to help out
over Christmas. The team held its annual movie event the
same day, where families enjoyed a screening of The Polar
259

Page 260

18 
Express, hot food and drinks, and a visit from special guests Santa and the conductor from the
Polar Express. Children also took away a book gifted from North Ayrshire Libraries and carrots
and reindeer dust for Rudolph on Christmas Eve. 
And the Care at Home team at Trindlemoss in Irvine - having recognised that there would be a
number of service users spending this festive period without their families - organised a three-
course Christmas lunch event, bringing everyone together. This was made possible thanks to
kind donations from staff, as well as community champions from Tesco and Asda in Irvine and
the Spar in Saltcoats, and this generosity also led to special meals being provided on Boxing
Day and New Year’s Day for residents to enjoy.
2.8 The rain didn’t dampen spirits at Trindlemoss Day Opportunities as service users and their
families, staff, and members of the public came together to enjoy the annual summer fayre.
Despite outdoor activities being cancelled due to wet weather, there was plenty to keep
everyone entertained indoors, with a range of stalls selling everything from crafts and sweet
treats to jewellery, personalised cups, candles and much more.
Guests tried their luck at the raffle and bottle stalls, with free hotdogs, burgers and tempting
international food on offer, as well as a Tiki bar providing non-alcoholic drinks and the
Baristamoss team brewing up teas and coffees.
Entertainment was provided by a DJ,
human fruit machine and a fantastic
magic and balloon art show, with a
limbo dancing contest also proving
popular.
Staff at Trindlemoss would like to
thank everyone who came along on
the day, as well as the stallholders
and those who contributed prizes for
the bottle stall and raffle.
2.9 Input are an organisation based at Towerlands Community Centre in Irvine that provides work
preparation for people with additional educational needs. 
This skills development programme is based on the refurbishment of digital devices, with
trainees learning about computers, their components, where they go and what they do, gaining
valuable employment skills like communication and teamwork and boosting their confidence
along the way.
The refurbished devices are then distributed throughout the community to those who are
digitally isolated, or to local charities. Referral for trainees is usually via a support organisation
such as schools, social work or social care services, however prospective trainees can also
approach Input directly. 
In addition, Input holds drop-in tech sessions on Fridays from 1pm to 3pm at the community
centre, where members of the public can pop along for some tech advice and support from the
trainees.
260

Page 261

19 
2.10 Pupils from St Bridget’s Primary in Kilbirnie brought some Christmas cheer to Anam Cara on
Wednesday, where guests enjoyed a festive sing-along with their ‘Wee Pals’.
The Wee Pals project has been running since 2015, with pupils regularly meeting with guests
at the facility to interact, share meaningful activities, learn from each other and have fun.
Depending on the content, these sessions
are also sometimes held at the school,
community hub or local library.
The aim of this intergenerational work is to
help prevent isolation and reduce
loneliness for people with dementia in a
respite setting. It also helps to create an
environment where children feel
comfortable around people with dementia
and can build in confidence. 
2.11 North Ayrshire Council and Carers Gateway North Ayrshire have signed up to a new UK-wide
commitment aimed at improving the lives of young carers and young adult carers, with NAC
leading the way by being the first local authority in Scotland to sign up for this important
initiative.
The Young Carers Covenant was launched by the Carers Trust and the Young Carers
Alliance, setting out a series of outcomes for organisations to work towards to ensure the life
chances of young carers are improved. 
Caring can have a serious impact on a young
person’s education and long-term future, with
many young carers missing out on important parts
of their childhood. This means it is vitally important
that they receive the right support at the right time
to enable to them to continue in a caring role while
being a child or young person first. 
By signing up to the Young Carers Covenant,
North Ayrshire Council and its partner Carers
Gateway North Ayrshire have made the commitment to work towards ten key outcomes that
will improve life chances for young carers, ensuring they are identified at the earliest
opportunity, receive timely support, are able to thrive in education and employment, have time
for themselves, and are able to maintain good physical health and wellbeing.
This will involve continuing to work with education services, including colleges and universities,
to ensure staff and students know who young carers are, the effects of caring roles and how to
identify and support them  
261

Page 262

20 
2.12 North Ayrshire Council is one of three Scottish local authorities that are collaborating with
health experts on ways to improve health and wellbeing for residents.
The wide-ranging partnership will examine ways to strengthen and accelerate actions that will
reduce health inequities for people living in North Ayrshire, Aberdeen City and South
Lanarkshire.
Health boards in each of the three
areas will also work alongside Public
Health Scotland (PHS) and University
College London’s Institute of Health
Equity (IHE), on the two-year-long
Collaboration for Health Equity in
Scotland. 
The local partnership was officially
launched in February at Saltcoats
Town Hall and Councillor Marie Burns, Leader of North Ayrshire Council, welcomed attendees
including Professor Sir Michael Marmot, Director of the IHE, as keynote speaker.
The partnership approach will see the three councils working with independent experts to
receive practical guidance and support to introduce positive change at local level.
North Ayrshire Council engaged with partners from the Community Planning Partnership
(CPP) and Integration Joint Board (IJB) before submitting an expression of interest to be
involved, which was subsequently accepted.
The Collaboration will offer guidance that is aligned with the Council’s “wellbeing” priority,
which includes helping residents to navigate the continuing Cost-of-Living Crisis and tackling
child poverty.
2.13 Harbourside Men’s Shed was established in 2018 to tackle issues of social isolation and
mental health by providing support and activities for men in Irvine and the surrounding areas.
Aimed at all men over the age of 18, everything that is provided for members is free to use,
ensuring that no one is excluded due to poverty.
Based at 29 Kyle Road, Kyle Industrial Estate, Irvine, the Men’s Shed is open from 10am to
3pm, Tuesdays to Thursdays, with anyone welcome to go along on a drop-in basis, take part
in a range of activities in its well-equipped workshop, and enjoy a cuppa and a chat. 
Tuesdays and Thursdays cater mainly for woodworkers, with Wednesdays mostly attracting
those who are more interested in model making and painting. However, there is nothing to
prevent anyone attending any day the shed is open to work on whatever project they wish. 
The Shed also works closely with other charities, schools and private customers to build and
supply garden furniture, planters, and other handmade wooden items.
A major study by Glasgow Caledonian University and Age Scotland found that Men’s Sheds
are delivering tangible benefits for both physical and mental health in members, with
improvements in fitness through participation in physical work, and a reduction in health visits
262

Page 263

21 
such as GP appointments. Shed visits were also found to give participants a renewed sense of
purpose.
2.14 Money Matters has had a dedicated Welfare Rights Officer providing advice in North Ayrshire
secondary schools since 2021. The service has been a huge success and has put more than
£1 million into the bank accounts of families during this time.
The project has now expanded, with an additional two Welfare Rights Officers joining the
team. This will enable the team to offer advice to all parents / carers with children in any
education establishment, including early years, primary and secondary. 
The three Welfare Rights Officers will be split across the localities and referrals can be made
direct to the officer by phone, email or ‘contact us’ form.
In total, across all areas, the Money Matters team accessed benefits across to the incredible
sum of £21,530,176.11, an increase of almost £1 million pounds from 2023-24. 
National Indicators 
Indicators NAHSCP Scotland
Carers who feel supported to continue in their caring role 31.6% 31.2%
Adults who are supported at home who agreed they felt
safe 67.5% 72.7%
Premature mortality rate (Under 75s age-standardised
death rates for all causes per 100,000 population
507
(2023)
442
(2023) 
263

Page 264

22 
Enable Communities
National Outcomes 
3 People who use health and social care services have positive experiences of those
services, and have their dignity respected.
7 People who use health and social care services are safe from harm.  
264

Page 265

23 
3.1 The Family Centred Wellbeing Service (FCWS) are a team of 14 wellbeing workers who
support families with children between the ages of 5-18. We support over 170 families in North
Ayrshire, with sessions provided within the family’s homes, within our offices, community
buildings, and schools. We seek to build on existing parenting capacity and provide practical
support, advice, and guidance that will enhance family wellbeing and relationships.
The team use the facilities in Meadowcroft to bake/cook with our families, giving them an
opportunity to connect, bond and learn life skills that can have a positive impact on their
wellbeing and finances. We use the garden to develop play-based skills and to encourage
positive mental health and wellbeing.
Over the summer, the team devised and facilitated a summer programme that ran twice a
week for the full summer for our families. They utilised accessible community resources in
every area (for example, Fairlie beach, low green Irvine, Dalry Park, Eglinton Park, Ardeer
Beach) and did free activities for our families to help build their confidence and show parents
and carers how to access outdoor activities that will have a positive impact on their physical
and emotional health. It also encouraged families to access local community resources and
build further contacts within the community, reducing the impact of social isolation.
3.2 During 2024 to 2025, 171 compliments were received by the Health and Social Care
Partnership relating to the services provided and the professionalism demonstrated by
partnership staff. 
Compliments 
"We are obviously in the very early days following my Dad's passing but I would like to take
the opportunity to bring to your attention the absolutely fantastic service and support which we
have received from the 3 Towns Social Services in Saltcoats thus far - particularly [name] who
attended to carry out the initial assessment for my mum on the same day her needs were
brought to her attention, and [name] who has been following up with the arrangements. 
We acknowledge that there is, as ever, acute pressure on resources but they have gone out of
their way to make us feel reassured in relation to my Mum's care needs, particularly while I
remain overseas… 
Theirs are stressful and intensive jobs, and I should be very grateful if you would bring their
sterling performance to the attention of the relevant Council executives.” 
"I wanted to write this email to be passed on to the Crisis Team within North Ayrshire
particularly the two ladies that visited my Aunt on the Friday night and then [name] and [name]
who became involved over the weekend. 
As I reflect today, I just want to say such a sincere thank you to the crisis team who were there
to care for my Aunt at the most fragile time in her life and for supporting us as a family. The
calm approach, values and support of the team are what got us through those early days
before she was then moved on to ward 9 for a longer period of assessment. It is not often
people pass on compliments, usually people are fast to complain. But on behalf of my Aunt,
uncle and two cousins I cannot thank you enough. Thank you from the bottom of our hearts.
You are definitely unsung heroes who we will always remember!”
265

Page 266

24 
"[name] called to advise he was extremely happy with the service he had received from [name]
at the Blue Badge clinic last week. Made him feel at ease and received a fantastic service.”
“My late wife who passed away last month was a client of the NAC Care at Home Team for the
Kilwinning Area. I write to express my deep gratitude for the high quality service provided by
this team over many years and particularly as [name] condition worsened. We would not have
been able to have [name] at home until the end without the skilful care and compassion of
team members at every level.” 
"My mum was receiving palliative care having being diagnosed with late stage pancreatic
cancer. She wanted to be at home at the end of her life which was also my dad’s wish. My
sister and I were supported incredibly by the district nursing team, without whom we absolutely
would not have managed to care for my mum at home as she wished. The care and attention
shown by the team was incredible especially the way they absorbed the time demand required
to support my mum seamlessly in response to her changing needs, in addition to the rest of
their community caseload, never giving any sense of the time pressures we know they must
have been under but always going the extra mile to ensure my mum was comfortable. 
This often meant several visits a day and it was obvious that at times members of the team
were working well beyond the end of their working day to make sure that my mum had what
she needed before they went home. The quality of the nursing care they offered was
outstanding, as was the care and compassion shown to my parents and us throughout. I was
amazed that in spite of services in the community and resources being so stretched, such a
quality of service is still being delivered and that is testament only to the very hard work,
professionalism and values of the local district team who go the extra mile mile to care for
those who depend of their care. What a tremendous asset they are to the local community in
Largs." 
3.3 A total of 156 complaints were received during the year and were across all service areas, with
22 complaints being upheld.
Complaint Topic Number
Service provision/delivery 81
Staff behaviour (including alleged or perceived) 34
Communication 17
Other 8
Continuity of staff 4
Community OT 3
Quality of care 3
Waiting times 3
Justice Services 2
Blue Badge 1 
3.4 Refugee Festival Scotland is an annual celebration of the contribution refugee communities
make to life in Scotland. As part of the Refugee Festival Week in June 2024, service users
266

Page 267

25 
involved with our Refugee and Resettlement Team were invited by the Salvation Army in
Kilbirnie to prepare a Syrian buffet for an event to celebrate different cultures. A Syrian meal
for 35 elderly residents was prepared and included traditional Syrian foods as well as
traditional Scottish cuisine. The feedback was fantastic, and everyone enjoyed sampling
different delicacies. This event created an opportunity for people from different backgrounds to
get to know each other and find out what they have in common thus enabling and building
bridges across our communities.
3.5 In August, agreement was reached which saw the renewal of the HSCP’s contract with The
Notre Dame Centre, Glasgow, to provide intensive, therapeutic counselling support to
children (and their families) who have experienced sexual abuse or other forms of complex
trauma. 
The support comprises of a 6-week assessment process followed by up to three blocks of 10-
week intensive support tailored to the individual needs of the child. Various therapeutic
approaches are available to the children including Talking Therapies, Play Therapy, Art
Therapy and Eye Movement Desensitisation and Reprocessing (EMDR) for example. The
most appropriate approach is identified through the initial assessment period.
The sessions are designed to create opportunities for children and their wider families to
reflect on issues which are impacting on the child’s life and to facilitate change and allow for
recovery.
3.6 Fullarton ConneXions is a community hub
serving the areas of Fullarton and
Harbourside in Irvine and beyond. Operating
as a social enterprise, the organisation hires
out corporate meeting space and provides
hospitality to generate income for community
interest groups, peer support, a volunteering
programme, and a recovery support group. It
also runs a low-cost community cafe four
days per week that everyone is welcome to
use.
Most of the groups that run from the hub’s premises at Fullarton Parish Church are organised
and delivered by third parties, however, its booking system is structured in such a way as to
give discounted rates and priority to activities that meet specific local needs and promote the
building of healthy communities.
3.7 The ILF (Independent Living Fund) Scotland Fund fully reopened in April, with an initial
investment of £9 million from the Scottish Government. This investment will enable up to 1,000
additional people in Scotland with the most complex needs to access the support they require
to live independent lives.
ILF Scotland accepts applications from all Local Authorities across Scotland. North Ayrshire
has an allocation of 32 new applications for the first year of reopening, where up to an extra
£330 per week can be accessed per applicant who meets the following access principles for
the fund:
• They live in Scotland
267

Page 268

26 
• They are aged 16 years or over at the time of application
• They access SDS (Self Directed Support)
• They receive a net weekly budget of at least £800
3.8 The North Ayrshire Dementia Support Service can provide support to those living with
dementia, as well as their carers and families. Each individual’s dementia journey is unique,
and the service will tailor its support to meet their needs, whether that be at home or in the
local community. 
The service can provide guidance, information and rehabilitation services – including personal
care – to help individuals remain in their own home for as long as possible. It can also assist
them to attend hearing, eyesight, dental and GP appointments.
The team’s specially trained support staff will also work with their carer or family, giving
accurate and up to date information on the individual services that can provide the best
support to people affected by dementia and those around them, as well as signposting to
respite services.
Staff can make referrals through the local social work office. The assessment will help to
determine their needs and decide how these can best be met. Individuals and families can
also self-refer by contacting their local NAHSCP office. If they already have a care manager in
place, they can also be referred by them to the service.
3.9 Support for people with dementia in North Ayrshire received a boost after Anam Cara respite
centre in Kilbirnie was officially reopened with a ribbon-cutting ceremony on Tuesday 4th June
following an extensive refurbishment project.
The specialist dementia respite centre accommodates up to 9 guests aged 60 years or over,
offering critical respite services within single room, en-suite accommodation. The support
service, which is run by North Ayrshire Health and Social Care Partnership, had been
temporarily relocated to the vacant Taigh Mor site in Beith to allow the service to continue
while works were carried out.
The refurbishment project included
a complete transformation of the
main garden area, including new
garden furniture, with a ramp
installed from the conservatory to
allow better access for guests to
enjoy the outdoors. An additional,
smaller garden area adjacent to the
dining area has also had some
landscaping improvements made. 
A full revamp of the internal areas
of the building has also been
carried out, with works including
wet wall installation in several of
the bathrooms, replacement light fittings with energy-efficient LED bulbs and a full upgrade to
268

Page 269

27 
the reception area. An archway has been created within the dining area to improve the space,
allow better access to the outdoors and create an improved flow for staff moving around the
area, and a new boiler and generator have been installed.
3.10 Scottish Breastfeeding Week is an annual event, which this year ran from Monday 10 June
to Sunday 16 June, which aims to enable new mums/parents to consider their breastfeeding
journey and how they can be supported to:
• Breastfeed in public
• Breastfeed and return to work
• Access local and national peer support
As part of the celebrations, the Community Infant Feeding Team were at Irvine Library on
Tuesday 11 June, where staff and members of the public came along to chat about all things
feeding related, with an additional focus on this year’s theme of returning to work whilst
breastfeeding and the support available. 
3.11 In a groundbreaking achievement, NHS laboratory specimens were successfully delivered
from the island of Arran by drone across the Firth of Clyde. This innovation, part of Project
CAELUS, reduced delivery times from several hours to just 30 minutes, significantly speeding
up diagnostic processes and treatment decisions. This project demonstrates the commitment
to leveraging technology to enhance healthcare delivery, particularly benefiting remote and
rural communities. The successful trial marks a significant step forward in addressing logistical
challenges faced by remote communities.
3.12 Beith Trust supports community development and regeneration projects in North Ayrshire,
focusing on creating inclusive, sustainable spaces for learning, culture and wellbeing. 
At its core, the organisation is dedicated to
improving the quality of life of Beith
residents, however many of its services and
groups impact those outside of the local
community, including families, young people,
and those seeking personal development,
education or community engagement
opportunities.
Beith Trust’s activities are designed to
strengthen local engagement through
education, events and social enterprises,
with projects including Lend an Ear
Befriending Services, Garnock Valley
Helping Hands and many more. 
A variety of volunteer opportunities are also on offer, including project work, children’s events,
administration and facilities work. In return, volunteers receive funded training, skills
development and networking opportunities to boost their CVs and gain valuable experience.
269

Page 270

28 
3.13 The Scottish Centre for Personal Safety provides empowering personal safety training to
vulnerable individuals, organisations and businesses throughout Scotland.
Run entirely by volunteers, it offers empowerment-focussed, trauma-informed personal safety
training for people in North Ayrshire, including female survivors of violence/abuse, youths
affected by severe bullying, and people with learning
disabilities. These sessions can help to increase self-
confidence, lower anxiety levels, and can often improve self-
esteem. 
The charity’s base at the Barony St John Centre in Ardrossan
is also used as a wellbeing facility, hosting a range of activities
including Tai Chi, sound therapy, Reiki, and gym access. A
Wellbeing Café, sauna and ice plunge tank will also be
available from later this spring, and additional wellbeing
activities take place throughout the year, with therapeutic art
and creative writing classes planned for summer 2025.
The centre is open to any member of the public suffering from low mental health; however, the
focus is on female survivors of violence or abuse, children, people who are vision impaired,
people with learning disabilities, ethnic minority groups (including refugees), and LGBT groups
targeted by hate crime.
3.14 Our Refugee and Resettlement Team recently hosted an afternoon tea to help tackle social
isolation among Afghan ladies living in North Ayrshire.
During home wellbeing visits to newly arrived families from Afghanistan, the team identified
that the ladies often felt socially isolated and would benefit from meeting up with others from
our Afghan community to make some new connections. 
The event, which took place at Towerlands Community Centre in Bourtreehill, offered an
opportunity for them to come together, make new friends, share experiences and provide
support for each other. The invite was extended to all Afghan ladies living within North
Ayrshire, including those who had newly arrived and others who had resettled here over nine
years ago. 
Participants enjoyed having the opportunity to meet up, exchange phone numbers and to
discuss other events they would like to take part in to improve their mental health and
wellbeing. A WhatsApp group was also created for them to keep in contact and continue to
build friendships. 
The feedback from the afternoon tea was very positive, with the ladies expressing that it had
nurtured a sense of belonging and improved their confidence.
3.15 Self-Directed Support (SDS): For the reporting year 2024 to 2025, the following information
indicates how people have arranged and directed their support in North Ayrshire.
Self-Directed Support offers four options. These are:
• Option 1 – a direct payment, which is a payment to you or third party to pay for your
own support
270

Page 271

29 
• Option 2 – you direct the available support
• Option 3 – the local council arranges the support
• Option 4 – a mix of the above 
This continues to demonstrate that traditional support options are offered and accessed most
with 80% of people receiving Option 3, where little choice and control is exercised and support
is chosen, arranged and directed by the Health and Social Care Partnership.
3.16 Peace of Mind is an innovative programme aimed at reducing social exclusion and isolation
as a result of a disability, impairment or long-term health condition, with a particular emphasis
on people who do not receive statutory services but still need support.
Run by social enterprise Peace of Mind Services, the programme has been successfully
operating in Fife for the past three years and is now available in North Ayrshire thanks to
funding from the National Lottery.
Core to the Peace of Mind principle is the ability of individuals to exercise choice and control
over how, where and when they are supported to achieve their social outcomes, recognising
that engaging and taking part in community-based activities is key to health and wellbeing. 
As such, the organisation offers tailored experiences for individuals and groups based on their
interests and aspirations. This can include independent living skills such as managing money,
preparing healthy meals, attending the gym, or a wide range of activities such as going to art
galleries and museums.  
271

Page 272

30 
National Indicators 
Indicators NAHSCP Scotland
Adults receiving any care or support who rated it as
excellent or good  68.4% 70.0%
People with positive experience of the care provided by
their GP practice 60.0% 68.5%
Proportion of care services graded ‘good’ (4) or better in
Care Inspectorate Inspections 86.6% 81.9%  
272

Page 273

31 
Develop and Support Our Workforce
National Outcomes 
6 People who provide unpaid care are supported to look after their own health and
wellbeing. Including to reduce any negative impact of their caring role on their own
health and wellbeing.
8 People who work in health and social care services feel engaged with the work they
do and are supported to continuously improve the information, support, care and
treatment they provide.
9 Resources are used effectively and efficiently in the provision of health and social
services.   
273

Page 274

32 
4.1 The Children and Families Health Team have supported two members of staff to undertake
the Postgraduate Certificate in Child Protection at the University of Stirling. In line with
previous Scottish Government investment criteria, we have also supported one school nurse
to undertake the Specialist Community Public Health Nurse (SCPHN) course at Robert
Gordon University. 
The Children and Families Health Team are also in the process of concluding the roll out of
Trauma Skilled training to all staff within the service following two staff being trained as
trainers earlier in the year.
Within the HSCP, we also have a very strong reputation for providing high quality student
placements to help create a positive learning experience for the social workers of tomorrow.
This aligns with our commitment to grow our own workforce as referenced in our learning and
development strategy “Be the best you can be.” 
Recently, a student who finished their placement within the HSCP offered the following
feedback. 
“I have just finished my first placement, which was based in Justice Services. The knowledge
and skills I have developed during my time here has been invaluable. To see the value base
and work ethic of each and every member of the team and the commitment they have to
achieving the best outcomes with the people who use the Service has been such a positive
experience and one I will take with me throughout my social work career. The demand on the
service is exceptional and I know this can place workers and management under significant
pressure but as I fed back to the management team at the end of placement, I hope that they
do not lose sight of the invaluable work that they do and the difference they make. Going
forward I hope Justice Services continue to take on students as I feel the experience there is
unique and I am beyond grateful to have been lucky enough for this to have been part of my
student journey.”
Placements provide fantastic opportunities for students to develop their knowledge and skills
and get a solid grounding in relation to how social work interventions can support people
through particularly challenging and distressing times in their lives.
4.2 As platinum award winners in Investors in People, the Dirrans team were looking for a
different challenge so went forward for a new award from Investors in people ‘We invest in
wellbeing.’ The We invest in wellbeing framework looks for a strategy and approach to the
health and wellbeing of staff. This should be measurable and understand the impact of this on
staff practice. The team considered and improved practice by evaluating staff wellbeing
through surveys and feedback. They created a wellbeing policy and strategy to guide
wellbeing goals such as reducing sickness absence, improving job satisfaction and job
retention. They also developed subgroups that focussed on physical, psychological, social and
financial factors that can affect staff and shared this as a team to be more informed about what
supports staff can access to help improve wellbeing. 
The team reflected that they already felt that they had a strong presence for looking after staff
however going through this process it highlighted areas for improvement and how the
framework could improve the service. The We invest in Wellbeing framework comprises three
indicators, each with three themes. This defines what it takes to reach each level of
accreditation standard, silver, gold, and platinum.
274

Page 275

33 
It was intended to start at the first
level of ‘standard’ however when
receiving feedback, this had
jumped to silver which is an
amazing achievement, and the
Dirrans Centre were confirmed
winners of the silver award in
August 2024.
We invest in wellbeing silver award
means that you have an
established wellbeing strategy or
plan and that your people feel
positive about your strategy, plans
and activities. Developing and
supporting our workforce ensures
employees are more efficient and
effective in their roles, helps retain
our skilled and qualified staffing resources, and improves morale and job satisfaction.
4.3 The work of staff within Trindlemoss Day Opportunities was the focus of a recent very
positive Care Inspectorate visit. Feedback noted the sector-leading quality of what was
happening within the service. Ward 7A continues to experience significant pressure, with
delayed discharge continuing to be a key issue. The Ward staff and management team are
currently working with Healthcare Improvement Scotland to explore the impact of this, and
related conversations are also taking place with Scottish Government to promote their
understanding of the issue. Regular conversations are taking place with the adult Learning
Disabilities Social Work Team and Children and Families with Disabilities team, in support of
their planned integration. A service manager is now in post to support this work. The Learning
Disabilities Social Work Team is also being supported via the recruitment of a second team
manager. 
4.4 The Health and Social Care Partnership are delighted to advise the launch of a formal model
of support for workers in the creation of a Staff Vicarious Trauma Service. The Partnership
recognises the secondary trauma, stress and burn out, which can occur when working in a
complex human environment with many moving parts. The purpose of the venture is to
support staff who are working within the live space, exposed to complicated human contexts. 
The service will be delivered by Breaking The Silence, who have significant experience and
knowledge in this field and beyond, supporting victims of profound and vicarious trauma. Staff
will be able to access therapeutic support to work through the vicarious trauma they have been
exposed to. This will provide a safe space to process their experiences, gain therapeutic
insights/supports and build on their resilience to move forward. Incorporating coping
strategies, wellbeing plans with the purpose of helping staff to continue work responsibilities
without any detriment to their mental, emotional and physical health and wellbeing, protecting
them from, and reducing the risk of vicarious trauma. 
The contract will also provide two wider workforce training days each year for approximately
80 staff in total. The aim is to raise awareness of vicarious trauma per se - including learning,
development, preventative/promoting self-care responses, sharing experiences and practice-
based learning. Overall, the service aims to support staff’s wellbeing, offer protection from the
275

Page 276

34 
exposure of traumatic human experiences, while building staff resilience and minimising
disruption to the overall service through improved sickness absence and higher staff retention
rates.
4.5 Our first annual Care at Home Manager Development Day has taken place. This was
introduced as a practical support for new and existing managers to enhance both confidence
and skills, focusing on key areas such as:
1) Skill enhancement: Managers should continually develop their skills to keep up with best
practices.
2) Leadership Improvement: Effective leadership is essential for the managers to motivate
and guide their team.
3) Employee Development: Managers play a key role in the growth of their Care at Home
Teams, by improving their mentoring, coaching and feedback skills they can better support
the Carers whom they line manage. 
4) Networking: The development days enable the managers to share experiences and learn
from their peers. 
5) Wellbeing: Investing in the development of managers supports their wellbeing.
The service will continue to support future sessions, engaging in new concepts, continuing to
drive success and growth which also supports career progression. 
4.6 Following agreement at the Children’s Services Strategic Partnership, a second 0.8WTE Dads
Rock worker has been funded by the Whole Family Wellbeing Funding (WFWF) to be
employed by Dads Rock. This increase in staffing capacity will have a positive impact on the
number of requests for assistance being submitted. A second Dads Support worker will be
able to expand support to the Irvine and Kilwinning area.
4.7 Case Study: Community Nursing
Connie, Newly Qualified Nurse (NQN), Garnock Valley and Kilwinning Community Nurse
Team
I was assigned to the Garnock Valley (GV) District Nurse team as a year 3 student on my
management placement. During this placement when the NQN recruitment process
commenced one of the Staff Nurses had indicated she was going to retire. I was keen to work
in community nursing and made this speciality my first choice on my application form.
During my placement I was able to take on a small, delegated caseload and was able to plan
and assess the care for my patients with support from my Practice Supervisor and also from
the other staff in the team. This experience gave me confidence in what I would expect as a
Staff Nurse if successful at interview. 
All students in my cohort were offered interviews and I attended and I was delighted to be
informed I was the preferred candidate for the GV post. In the remainder of my placement, I
ensured I was exposed to as much of the community staff nurse role and responsibilities as
possible. I joined the team in September as a Band 4 Health care Support Worker while my
Nursing and Midwifery Council (NMC) pin was processed which came through early October
276

Page 277

35 
and I transitioned to a Registered Nurse. Working as a NQN is a daunting experience for any
individual, however I have only ever felt fully supported and valued. Ongoing induction and
mentorship to the role from both the wider District Nurse team and participating in the NQN
induction/education sessions has been beneficial to my journey and it also allows me to
discuss the NQN pathway with my peers in other specialities and department. Although I’m a
Staff nurse within the team I have access to every part of the wider Health and Social Care
partnership team in providing high standard of care for our patients and their families.
4.8 All employees of NAHSCP and our providers can now enjoy a year’s free access to Holly
Health, a fantastic mobile app that can support you to make small, achievable changes that
could help boost your health and wellbeing. 
Using a compassionate, personalised approach tailored to your own health goals, interests
and activities, the app can help you to reduce stress and anxiety, rebuild your relationship with
food, increase exercise and movement and improve your sleep.
Holly Health will assist you in making small but consistent changes to your daily behaviours,
helping you build healthier habits, promoting mindfulness and encouraging you to be more
kind to yourself.
In-app coaching is available through a supportive chat bot system, with friendly, motivational
reminders by text or email to keep you on the right track. The app also contains a wealth of
useful articles and videos that you can browse at your leisure.
Funded by NAHSCP, you’ll initially enjoy six months’ free access to the app, before being
invited to a further six-month subscription for free once that expires.
“I feel I have lessened how often I see my GP”
“This is a great idea and honestly feel this could help so many people if this is what doctors
are able to prescribe! A year’s free subscription to a brilliant self-help app, with no restrictions
and no judgement. This has been a godsend during a tough time.“
“The app is a great resource for reliably keeping on track with habits that are healthy and
productive. It is also very generous to allow us to have access to this app for the time being. It
is appreciated.“
4.9 The winners of the 2024 Partnership Awards were announced at our ‘Promoting Wellbeing
Together’ event at the Redburn
Community Centre in Irvine. 
The event was a fantastic celebration
of the staff, teams and individuals who
deliver health and social care services
in North Ayrshire, as well as the
crucial work of those in our
communities who support people with
their wellbeing, including volunteers,
community organisations and
charities.
277

Page 278

36 
4.10 Congratulations to Eileen Welch, manager of Burnlea Care
Home in Largs, who won the Care Leadership of the Year
Award in the 2024 National Care Home Awards. The
awards, hosted by Scottish Care, acknowledge the
individuals, teams and organisations within Scotland’s
independent care home sector.
The winners were announced at a ceremony held at the
Hilton Hotel, Glasgow on Friday 15 November. In addition,
Burnlea, which is run by Pepperwood Care, made it to the
final three in the Care Service of the Year and Meaningful
Activity of the Year categories.
Abbotsford Care Home in Ardrossan - also run by
Pepperwood Care - was also shortlisted in the Care Service
of the Year category. Well done to all involved in these
fantastic achievements. 
4.11 The LiveWell group have partnered with KA leisure to bring free health checks to Council
employees. The KA Leisure health check sessions include lifestyle and weight management
advice along with cholesterol, blood pressure, blood sugar testing and the Boditrax machine –
a clever system that assesses your body and, very quickly, delivers 14 different
measurements, such as your ideal weight, your BMI and your metabolic age.
Our Chief Executive Craig Hatton
booked in to one of the health check
sessions and encouraged others to do
the same. He said: “It’s been brilliant
having the opportunity to have my
recent employee health check, thanks
to the LiveWell group and our partners
at KA Leisure.
I think it’s important that colleagues
understand just how vital it is to take
time for their own health and learn
about what they can do proactively to
improve it. The reason I booked in to a
recent KA Leisure health check was
because I am mindful that I’m not
getting any younger and I knew – for my own peace of mind – that making time to have the
check done was going to be beneficial for me.”  
278

Page 279

37 
National Indicators
Indicators NAHSCP Scotland
Readmissions to hospital within 28 days of discharge
(rate per 1,000 discharges) 106 103
Percentage of adults with intensive needs receiving Care
at Home (all levels of CAH) 77.0% 64.7%
Number of days people aged 75+ spend in hospital when
they are ready to be discharged per 1,000 population 1,266 952
279

Page 280

38 
Improve Mental and Physical Health and Wellbeing
National Outcomes 
1 People are able to look after and improve their own health and wellbeing and live in
good health for longer.
5 Health and social care services contribute to reducing health inequalities.
9 Resources are used effectively and efficiently in the provision of health and social
services.  
280

Page 281

39 
5.1 Irvine Camera Club is an enthusiastic group of people from across Ayrshire who share a
common interest in photography.
The club is open to everyone, with members from all walks of life. Regular activities include
photographic competitions, exhibitions, invited lecturers, studio nights, practical evenings, trips
and social events - including visits to other clubs.
The group has also provided support to the NAC Arts & Culture Team and the Scottish Mental
Health Arts Festival, as well as working with NHS Ayrshire & Arran to provide photography
workshops.
5.2 The Three Towns Community Shed offers a safe and welcoming space for anyone over the
age of 18 to drop in, take part in a wide range of activities, learn some additional skills and
enjoy socialising with new friends. 
This fantastic community initiative was launched recently after bringing together the existing
local Men's Shed and recently formed,
She Shed under one banner, with a base
at 12C Castle Works, Hill Street,
Ardrossan. While the two groups learn,
create and socialise in their own right,
they also enjoy combined experiences
and social events.
Helping to combat social isolation, the
Shed offers local people a chance to go
along and take part in arts and crafts,
woodworking, 3D printing, model building,
bicycle repairs, fixing furniture or small
personal items, and even a music group. 
The Shed has recently been commissioned by both a local care home and primary school to
build them memorial benches and has previously built planters for other community groups.
5.3 A report produced by NHS Ayrshire & Arran’s Prevention and Service Support Team has
highlighted the positive impact of Naloxone distribution and use in North Ayrshire.
This safe and easy-to-administer medication temporarily counteracts the effects of opioids,
such as heroin, methadone, codeine, morphine and buprenorphine, and can save lives by
reversing an overdose for 20 to 40 minutes until emergency help arrives.
1,640 Naloxone kits were handed out in Ayrshire between April 2024 and March 2025 (741 of
which were in North Ayrshire), with 73 lives reported to have been saved in that time (18 in
North Ayrshire). However, the true number of lives saved is thought to be higher, with many
instances of Naloxone use going unreported. 
In addition, a total of 1.225 people received overdose awareness training across Ayrshire in
the same time period, with a further 428 people attending a virtual or face to face Naloxone
awareness course.
5.4 NHS Ayrshire & Arran, in partnership with Coloplast Ltd, has launched a successful pilot
service to improve the lives of people with multiple sclerosis (MS). This innovative service
281

Page 282

40 
focuses on managing neurogenic bladder and bowel dysfunction, a common issue for people
living with multiple sclerosis. Key achievements include the introduction of a dedicated bladder
and bowel clinical nurse specialist, early detection through patient questionnaires, and
significant reductions in urine retention and urinary tract infections. Patients have experienced
improved health outcomes, enabling them to engage more fully in work and social activities.
This pilot sets a new standard for MS care, demonstrating the benefits of early intervention
and integrated care pathways.
5.5 The latest inspection report for Montrose House Care Home, conducted on 29th October
2024, highlights a number of positive developments and improvements. The service has made
substantial progress since the previous inspection, positively impacting residents' experiences
and outcomes. The service received a "Good" rating for both supporting residents' wellbeing
and for leadership. Effective methods for staffing assessment and planning have been
implemented, ensuring safe and sufficient staffing levels. The introduction of robust quality
assurance processes has led to continuous service improvement, with key tasks delegated to
capable staff members. The employment of an activity coordinator has significantly enriched
residents' daily lives, and the home has improved its cleanliness and infection prevention
measures.
5.6 North Ayrshire's first ever Dementia Connect event was held, bringing together those living
with dementia and their carers to learn more about dementia care and the supports available.
Around 80 people attended the free event on 13th November at the volunteer rooms in Irvine.
Guest speakers included Professor Elaine Hunter, National AHP Consultant for Alzheimer's
Scotland, and Susan Holland, NHS Ayrshire and Arran's Nurse Consultant for Dementia. The
event featured conversations based on the outcomes of the national strategy, activities
highlighting the challenges faced by individuals living with dementia, and a marketplace with
representatives from local and national support services. The event was a great success.
5.7 Case Study: Scottish Healthcare Awards 2024
Our Multiple Sclerosis service based at Douglas Grant Rehabilitation Centre in Irvine were
shortlisted as finalists in the ‘Developments in the Management of Multiple Sclerosis’ Award in
the 2024 Scottish Healthcare Awards.
We are delighted to say that they were announced as winners of the category at the awards
ceremony, which was held at the Crowne Plaza in Glasgow in November.
The team was recognised for its work in involving patients in future developments to better
meet their needs, as well as its work in developing a suite of outcome measures to identify
changes in patients’ conditions at an earlier stage, allowing earlier intervention and sustaining
function and independence for as long as possible.
The Scottish Healthcare Awards acknowledge and celebrate those working across NHS
Scotland and its partners to deliver high quality health and social care services to the people of
Scotland.
A huge congratulations go to everyone involved in the care of patients with Multiple Sclerosis
in Ayrshire on this wonderful achievement. 
282

Page 283

41 
5.8 Recognised in Scotland’s National Dementia Strategy, post-diagnostic support is crucial for
people newly diagnosed with dementia. High-quality support over an extended period helps
individuals and their families live well with dementia and prepare for the future. The Scottish
Government guarantees a minimum of one year’s support for every newly diagnosed person.
Our team of Community Psychiatric Nurses provide timely emotional and practical support,
helping individuals understand their illness, manage symptoms, stay connected to their
community, and plan for future care. Additional practical help can be accessed via the local
social work office.
5.9 North Ayrshire Health and Social Care Partnership hosted a Mental Health and Wellbeing
‘Connect’ event on Monday 29 April at the Ardeer Community Centre in Stevenston. The
public were invited to come along and chat to the many visiting support services, browse the
stalls and participate in a variety of workshops focussing on a range of mental health topics.
Services such as VoiceAbility advocacy, North Ayrshire Carers Gateway, the NHS A&A Health
Improvement team, the Primary Care Mental Health team, Community Link Workers, North
Ayrshire Alcohol and Drug Partnership, the NHS A&A Suicide Prevention team and North
Ayrshire Wellbeing and Recovery College were in attendance.
A series of mental health and wellbeing workshops were also held on the day, with attendees
having the opportunity to take part in all of these, as well as some creative or active movement
taster sessions.
The event also offered the chance to share views on mental health services and supports in
your area, meet new people and chat to others with lived experience.
5.10 Following extensive engagement work in 2023 around the topic of transition from child to adult
services across learning disability and mental health services, a further phase of work was
commissioned to support the development of a transition carer peer support group. This has
been made possible through the commitment of some of the parents and carers that initially
engaged with us over last year and shared their lived experience.
The group named its self 'Transition Together - Carer Peer support Group' and launched in
summer 2024. These sessions will be carer led but supported by the partnership engagement
officers focussing on mental health and strategic planning, the CAMHS participation officer,
wider support staff and Unity Carers Gateway team to ensure ongoing engagement is
facilitated around this area of support. The purpose of the group is to:
• Provide peer support to other parents & carers
• Organise visiting expert guidance in order to share advice and resources
• Interactive workshops tailored to address specific concerns relating to transition
• Create an atmosphere of empowerment and resilience by building a stronger support
network for those facing a transition journey from children to adult services
283

Page 284

42 
5.11 The North Ayrshire Mental Health Arts Festival ran
between 1st October – 27th October 2024. We were
delighted to offer a number of events, providing us with
opportunities to engage with our communities about mental
health and wellbeing, whilst challenging stigma. As well as
open events available to the public, we also had a range of
closed projects, meaning we had one of the biggest
programmes in Scotland. 
5.12 Staff and customers of Trindlemoss Day Opportunities in Irvine presented a workshop at the
Accessible Book & Story Festival, which took place at the Scottish Storytelling Centre in
Edinburgh in September.
The festival session allowed a group of
North Ayrshire adults with learning
disabilities to share their experiences
of working with ShowWorks Theatre to
produce an innovative performance
piece around the theme of ‘being and
becoming’, an initiative that was
funded through Creative Scotland’s
Participatory Arts and Mental Health
Fund and The Baring Foundation, in
partnership with the Mental Health
Foundation. 
The ‘What Comes Next’ project, which
also involved members of
Neighbourhood Networks, began with a series of weekly sessions exploring the theme of life
changes - whether that be transition from child to adult services, transition into employment,
transitions into and out of relationships, or the many other changes that can occur throughout
life.
Over the course of six months, the group was actively involved in the entire creative process –
from the initial idea to the music and characters. Those taking part were also supported by
visual artist Lynn McNally to produce scenery, props and other responses to the theme.
The final performance piece included contributions from over 50 participants, with the project
culminating in a vibrant performance at the Harbour Arts Centre in May, allowing those
involved to share their aspirations in an imaginative and joyful way with their friends and
family.
From this performance, and additional footage captured before and after it, an inspiring short
film was produced by local film-maker Jim Gibb, which truly captures the energy and spirit of
those taking part.
The festival workshop in Edinburgh saw customers and staff of Trindlemoss presenting the
film to an audience, as well as taking part in a panel discussion afterwards, gaining extremely
positive feedback from festival organisers ‘My Kind of Book’.
284

Page 285

43 
5.13 Harbour Ayrshire provides a comprehensive support package aimed at reducing the effects
of drug and alcohol addiction across Ayrshire. 
As well as one-to-one support, the charity also runs support groups for men, women and their
families, offering a safe space to share experiences and help in the formation of positive
relationships. These groups also provide support in areas outwith addiction, including mental
health, homelessness, education, skills training and bereavement.
Groups are open on a drop-in basis, with no appointment required. Or to access one-to-one
support, anyone can self-refer by calling 1292 623016.
Harbour Ayrshire also offers a community support vehicle, helping those fleeing violence or
moving from temporary or otherwise unsuitable accommodation. It also operates a minibus
service, assisting those for whom transport is a barrier to accessing support.
5.14 Working for a Healthy Economy is funded by the Ayrshire Growth Deal. It aims to support
the residents and work force of Ayrshire with any health and wellbeing difficulties that are
impacting on ability to attend / make progress towards work.
You qualify for support if you:
• Live or work in Ayrshire
• Are Unemployed and looking to make progress towards work
• Are Self Employed
• Work for a company that employs less than 250 people
You don’t need a diagnosis from a GP/Health Professional. If you think that support would be
beneficial, you can self-refer. All support is free and confidential.
If you are motivated to make change but are experiencing difficulties with issues such as
anxiety, depression, panic, sleep, self-esteem, pain, mobility, alcohol, drugs or other barriers
that are preventing you from reaching your goals, help is available.
5.15 A team from North Ayrshire’s Drum 4UR Life (D4L) community drumming group presented a
‘CHIME to Drum’ workshop at the International Drum Circle Facilitator’s Guild Conference in
Myrtle Beach, South Carolina.
Drum 4UR Life is a community drum circle that supports positive mental health and wellbeing.
It meets weekly in Ardrossan, as well as offering monthly workshops in Irvine and Largs. In
addition, it has facilitated music-making experiences for over 100 community events and
groups over the past year. 
The theme of the conference was ‘journeys’, with the team powerfully sharing the evolution of
Drum 4UR Life using the framework of the CHIME recovery model, as well as their own
experiences around the connections, hope, identity, meaning and empowerment that come
from being involved with the group. The workshop went down a storm, receiving a standing
ovation lasting several minutes.
285

Page 286

44 
Drum 4UR Life grew out of the NAHSCP-funded North Ayrshire Wellbeing & Recovery
College, one of only five such services in Scotland, which focuses on self-management for
mental health and providing a strengths-based approach to learning and recovery.
5.16 Delayed Discharge rates per 1,000 population have continued to increase in North Ayrshire
with the rate for 2024 to 2025 being 20.6 per 1,000 population compared to 13.4 per 1,000
population across Scotland. 
The Health and Community Care Team have now moved into Year 2 of the Delayed
Discharge and Winter Improvement Transformation Plan, a dynamic and evolving programme
designed to help the Partnership meet the growing and complex needs of our communities.
North Ayrshire Health and Community Care representatives continue to work in collaboration
with NHS Ayrshire and Arran colleagues, to support effective hospital discharge and delayed
discharge plans, alongside plans to support winter resilience. The collaboration includes
supporting the newly implemented frailty zones and wards within acute hospitals to promote
early intervention and ensure safe ongoing care and support, in a homely setting from the
earliest possible opportunity.
5.17 The Community Led Action and Support Project (CLASP) is open to anyone aged 50 and
over, with an aim of reducing isolation and loneliness, improving health and wellbeing,
improving digital skills, and providing information and advice on issues affecting older people.
The Stevenston-based charity offers a wide range of
services across multiple venues and localities in North
Ayrshire, including home/telephone befriending, social
activities, health and wellbeing classes, weekly lunch
clubs, and one-to-one/small group digital tuition and
support. 
Through its HOPE in the Community project, CLASP also provides a range of volunteering
opportunities including befriending, digital buddies, activity support volunteers, minibus drivers,
lunch club helpers and admin support. It is also seeking new trustees to join its
Board/Management Committee. Training is provided and out of pocket expenses reimbursed. 
286

Page 287

45 
National Indicators 
Indicators NAHSCP Scotland
Adults supported at home who agree that their services
and support had an impact on improving or maintaining
their quality of life
67.6% 69.8%
Proportion of last 6 months of life spent at home or in
community setting 87.6% 89.2% 
287

Page 288

46 
MSG Indicators 
Indicators Value
Emergency admissions to acute hospitals* 18,692
Emergency admissions to acute hospitals (Rate per 1,000) 139.9
Admissions from emergency department 8,584
Admissions from emergency department (Rate per 1,000) 64.3
Percentage of people at emergency department who go onto ward stay (conversion
rate) 25.5%
Unscheduled ‘hospital bed days’ in acute hospital* 145,927
Unscheduled ‘hospital bed days’ in acute hospital (Rate per 1,000) 1092.5
Unscheduled ‘hospital bed days’ in long stay mental health hospital* 25,676
Unscheduled ‘hospital bed days’ in long stay mental health hospital (Rate per 1,000) 192.2
Unscheduled ‘hospital bed days’ in geriatric long stay* 7,533
Unscheduled ‘hospital bed days’ in geriatric long stay (Rate per 1,000) 68.9
Emergency department attendances  33,606
Emergency department attendances (Rate per 1,000) 251.6
Percentage of people seen within 4hrs at emergency department 65.00% 
MSG Indicators – Delayed Discharges 
Indicators Value
Delayed discharges bed days (all reasons) 27,099
Delayed discharges bed days (all reasons) (rate per 1,000) 247.7
Delayed discharges bed days (code 9)  9,410
Delayed discharges bed days (code 9) (rate per 1,000) 86.0
Delayed discharges H&SC Reasons 17,535
Delayed discharges H&SC Reasons Rates 160.3 
* Calendar year 2024 used as a proxy for financial year 2024/25 due to data completeness,
following advice from Public Health Scotland. 
288

Page 289

47 
National Health and Wellbeing Indicators
The Scottish Government identified 23 (4 remain in development) indicators that were felt evidenced the 9 National Health and Wellbeing
Outcomes. Nine indicators come from the biennial Health and Care Experience Survey (see below) and the additional 14 indicators (also
below), which evidence the operation of NAHSCP, come from the NHS Information Services Division (ISD) survey. This survey represents a
sample of the community and asks about the collective services received whether it be from Social Services, NHS, the collective HSCP,
Private or Voluntary organisations. The survey responses do not separate each organisation’s service provision. 
The information below represents the most up-to-date information with further updates accessible from – Public Health Scotland 
Health and Social Care Experience Indicators 2015-16 2017-19 2019-20 2021-22 2023-24
Scottish
Average
%
Rank
against
Family
Group
Adults able to look after their health very well or quite well 94% 91% 92% 89% 89% 91% 2
Adults supported at home who agreed that they are
supported to live as independently as possible 82% 84% 84% 81% 67% 72% 7
Adults supported at home who agreed that they had a say
in how their help, care, or support was provided 78% 70% 75% 73% 51% 60% 8
Adults supported at home who agreed that their health and
social care services seemed to be well co-ordinated 73% 74% 76% 64% 55% 61% 7
Adults receiving any care or support who rated it as
excellent or good 81% 78% 77% 76% 68% 70% 5
People with positive experience of the care provided by
their GP practice 83% 80% 73% 61% 60% 69% 6
Adults supported at home who agree that their services and
support had an impact on improving or maintaining their
quality of life
83% 82% 79% 78% 68% 70% 6
289

Page 290

48 
Health and Social Care Experience Indicators 2015-16 2017-19 2019-20 2021-22 2023-24
Scottish
Average
%
Rank
against
Family
Group
Carers who feel supported to continue in their caring role 41% 39% 31% 31% 32% 31% 6
Adults supported at home who agreed they felt safe 80% 80% 85% 83% 67% 73% 7
To support service improvement, the Scottish Government has identified local authority / Partnership benchmarking families. These family
groups are made up of eight local authorities that share similar social, demographic and economic characteristics. Comparing our
performance information with our family group should provide a more meaningful comparison with similar areas and allow for greater
opportunities for shared learning and best practice. Rankings are on a scale of 1–8, where 1= best performing, 8=worst performing.
North Ayrshire is partnered in its family group with: East Ayrshire, Dundee, Western Isles, Glasgow, Inverclyde, North Lanarkshire, and West
Dunbartonshire.  
290

Page 291

49 
Indicators based on administrative data 2020-21* 2021-22* 2022-23* 2023-24* 2024-25* Scottish
Average  
Rank
against
Family
Group
Premature mortality rate. (Under 75s age-standardised
death rates for all causes per 100,000 population). 516 568 527 507 Unavailable 442 4
Rate of Emergency Hospital Admissions for adults (per
100,000 population) 13,860 14,269 13,449 14,009 15,142 11,559 8
Rate of emergency bed days for adults. 138,799 155,206 151,553 142,222 155,896 113,627 8
Readmissions to hospital within 28 days of discharge. 122 113 100 101 106 103 5
Proportion of last 6 months of life spent at home or in
community setting. 89% 89% 88% 88% 88% 89% 6
Falls rate per 1,000 population aged 65+ 18 20 20 22 23 23 4
Proportion of care services graded ‘good’ (4) or better in
Care Inspectorate Inspections. 87% 79% 78% 83% 87% 82% 3
Percentage of adults with intensive needs receiving Care at
Home. (All levels of CAH) 73% 77% 77% 78% 77% 65% 1
Number of days people aged 75+ spend in hospital when
they are ready to be discharged per 1000 population) 382 805 1,038 1,087 1,266 952 7  
*Column contents are the most up to date data information received from Scottish Government statisticians.
As well as the National Health and Wellbeing indicators, we regularly report on local measures to help us to evidence performance against the nine
National Health and Wellbeing Outcomes and our Strategic Priorities. The list of local indicators can be found in Appendix 1. The full list of
indicators can be found in Appendix 2.
291

Page 292

50 
Performance in relation to the three Children’s Outcomes and
three Justice Service Outcomes 
292

Page 293

51 
Children’s Outcomes
Outcome 1: Our Children have the best start in life and are ready to succeed.
Outcome 2: Our young people are successful learners, confident individuals, effective
contributors, and responsible citizens.
Outcome 3: We have improved the life chances for children, young people and
families at risk.
1.1 A transformation programme to improve outcomes and opportunities for care experienced
children and young people in North Ayrshire is now under way, with progress being made
since its launch in April 2024.
The Brighter Pathways Programme Board was set up to look at how services can be
delivered differently to ensure care experienced children and young people have access to the
appropriate resources and supports into adulthood.
In line with its Promise commitments, North Ayrshire Health and Social Care Partnership
(NAHSCP) has a firm focus on providing the right support and intervention to allow children
and young people to remain with birth family or wider family wherever possible, preventing
them from coming into local authority care - for example, being placed in foster care or in
residential children’s houses. 
To build on this already established early intervention work, the Board is currently looking at
the supports available for families to identify if there are any gaps in service provision where
additional early help and more intensive
support could help more children to
remain with their families.
An acute challenge in recruiting and
retaining foster carers is having an
impact nationally, which has been further
impacted by the current cost of living
crisis and a reduction in the number of
potential foster carers having spare
bedrooms due to an increase in home
working and their own children staying at
home for longer.
Recruiting foster carers for NAHSCP is further impacted by a number of independent fostering
agencies operating in the area and taking on carers. In a bid to boost recruitment, which is a
priority for the programme board, an investment in a long-term digital marketing campaign has
recently been agreed, working with a provider that has a proven track record in local authority
foster care recruitment.
1.2 The Annual Promise Conference 2024 was held on Monday 9th December and saw 73
young people from across our Secondary Schools join for a day of connection.
The aims of the Conference were to:
293

Page 294

52 
• Introduce young people to The Promise Plan 2024 to 2030
• Offer workshops centred around The Promise’s foundation of voice
• Allow time for building connections with other young people and Corporate Parents
The day was hosted by Donna Anderson, North Ayrshire Council’s Youth Participation and
Democracy Officer, and Adam Johnson, local Care Experienced young person and MSYP for
Cunninghame North. 
Young people were involved in the planning of the Conference at all stages. This year’s
agenda included interactive workshops delivered by local Corporate Parents nominated by
young people.
1.3 In December, the HSCP received notification from the Scottish Government that the
Delivering Equally Safe Fund would provide a further 12 months funding to allow us to
continue to develop our approach to providing crucial support to survivors of violence against
Woman and their children. 
This funding will be used to recruit a lead officer to further progress activities to embed the
Safe and Together Model on a pan Ayrshire basis. The Safe and Together Model is an
internationally recognised suite of tools and interventions designed to help Social Workers and
other key professionals to engage with families experiencing domestic abuse, in a child
centred, strengths-based way.
1.4 This year, the United Nation’s Convention on the Rights of the Child (UNCRC) was fully
incorporated into Scots Law - The Children and Young People's Commissioner Scotland.
The UNCRC articles provide for every aspect of a child’s life from birth up to the age of 18
years. Guidance around UNCRC is clear that incorporation and adherence to UNCRC is the
responsibility of all public sector organisations and services, including those services viewed
as “adult services.”
To support our work within the HSCP, it was seen as critical to establish a baseline of
understanding and preparedness for implementation across all services. As such, in
November 2024, using the Improvement Service’s Getting Ready for UNCRC Incorporation
Framework document, a benchmarking document was developed with an ask that all services
within the HSCP complete to the best of their ability. 
Responses provided related to current practice within each service. Results have been shared
with all services. Moving forward each service will use the benchmarking exercise to identify
compliance and any areas that require special attention to ensure implementation.
1.5 Across our Children and Families services, various Christmas toy appeals were organised to
support our most vulnerable families during what can be one of the most stressful, difficult and
expensive times of year for our families, especially given the levels of child poverty in North
Ayrshire, which sits at 29%. Our Health Visiting Services alongside our Children and Families
Social Work teams worked hard to fundraise and collect donations of toys and clothes that
could be gifted within our local communities. Staff were humbled by the generosity of those
who contributed but also moved by the appreciation shown from those receiving support.
294

Page 295

53 
1.6 February saw the launch of a brand-new mobile app called ‘CE4U’ (Care Experience for
You), the mobile app for iPhone and Android has been designed specifically for care
experienced young people. Launched as part of National Care Day, an annual awareness day
to celebrate care and compassion of children and young people with care experience, the app
has been developed with the help of pupils from local secondary schools over the past 18
months.
Free to download, its aim is to provide a hub of useful information and helpful advice on
everyday topics including housing, travel, mental and physical health, recipes, job
opportunities and entitlements.
Developed by young people for young people, the collaboration was made possible due to
fortnightly Champions Board meetings that take place in our secondary schools. These drop-
ins provide a safe space for care experienced pupils to get advice, plan peer events and
access scaffolding and support to help them succeed.
The launch is part of the Council’s wider Corporate Parenting Strategy to meet its statutory
duties to keep The Promise to Scotland’s care experienced community – in this case those
living and studying in North Ayrshire.
1.7 The Tea & Tots programme - run by the Breastfeeding Network (BfN) - has secured
additional funding from The National Lottery, allowing BfN Ayrshire and Arran to continue
offering these free peer support groups across North Ayrshire for all parents/carers with a
baby or child under nursery age (open to all feeding types).
Tea & Tots infant feeding groups provide a space for emotional and mental wellbeing support,
as well as providing information on feeding, starting solid foods, income maximisation and
much more - including regular Bookbug sessions, sensory activities, and guests from local
organisations like Child Smile and Messy Munchers.
The groups are free to attend and offer refreshments, toys, and books for little ones. Siblings
and older children are also welcome to join in.  
295

Page 296

54 
Justice Outcomes
Outcome 1: Community Safety and Public Protection.
Outcome 2: The Reduction of re-offending.
Outcome 3: Social inclusion to support desistance from offending. 
2.1 The Multi Agency Public Protection Arrangements (MAPPA) are a set of statutory
arrangements that allow for the assessment and management of the risk posed by people
convicted of certain sexual and violent offences. In Scotland, arrangements were established
by Sections 10 and 11 of the Management of offender’s et cetera Scotland act 2005 and
became operational in 2007. MAPPA brings together the Police, Local Authority Social Work
Justice Services, the NHS and Prison Service. In addition, some other agencies are under a
duty to co-operate with the Responsible Authority in respect to the arrangements. These
include, local authority housing, the Reporter to the children’s panel, certain registered social
landlords and electronic monitoring providers.
The creation of an effective Risk Management Plan is the key factor in the MAPPA process.
To support staff in this critical task, on 19th and 20th of June 2024, subject matter experts from
the Risk Management Authority Scotland , provided training on the best ways to approach this
task. The training was attended by over fifty members of staff from both the Police and Justice
Services.
As a result of the training there has been an immediate improvement in the quality of the
important foundation documents produced by Justice social workers with positive feedback
received “Your Risk Management Plan was first class, comprehensively detailing the risk
factors and the plans in place to mitigate risk and throughout the MAPPA meeting, your role in
working with Mr A and the therapeutic relationship you have with him was highlighted by every
other service”.
2.2 Case Study: Employability Mentors
Employment can contribute significantly towards desistance and the development of a pro-
social lifestyle for service users involved in the Justice system. People released from prison
without a job are twice as likely to re-offend as those released with employment opportunities
lined up.
People with convictions may also face stigma and inequality associated with declaring a
criminal record, or an unwillingness by some employers to provide those with criminal
convictions with job opportunities. The Employability Mentors located within our Unpaid Work
team assist service users involved with the Justice system to obtain skills that will enable them
to gain employment and training opportunities to support reintegration into the community.
The impact of the work of our Employability Mentors is reflected in J’s story.
J's Story
296

Page 297

55 
This is the story of J, who overcame significant personal and professional challenges to rebuild
his life. J's journey from a tumultuous background to a promising future is a testament to
resilience, support, and determination. Following a court order that mandated 18 months of
social work supervision and 180 hours of unpaid work, his life took a difficult turn. This period
marked the beginning of numerous challenges, including poor physical and mental health,
which necessitated additional support from various departments, including addiction services.
Employment History
J had a career in His Majesty's Armed Forces but was discharged due to physical and mental
health issues. During this time, he picked up charges before transitioning to roles in security
and as a bus driver. However, J’s health issues impacted on his ability to sustain employment.
J was referred by his Community Payback Officer (CPO) to the Employability Mentor service
to help him reassess and explore his employability options.
The Employability Mentor Service is a dedicated one-to-one service for individuals who are
involved with Justice Service to identify further education, training, volunteering and
employment. By tackling the additional barriers service users face, by being involved with the
Justice Service, the employability mentors are able to realistically provide support to reach
long lasting positive destinations.
The CPO Employability Mentor Service offers people information, advice and guidance on
disclosure related issues. This includes helping people understand their rights when disclosing
an offence, how restrictions can affect their job hunting or how to reskill into a new career.
The Challenge
Due to his offence, J was forced to reskill and seek new employment opportunities. His
physical and mental health further complicated his ability to find and maintain stable
employment. Despite these setbacks, J was determined to improve his situation and with the
support of the Employability Mentor sought a new career path, enrolling in courses through the
Open University and other training programs.
Financial Assistance
Addressing financial barriers was crucial. Assistance with fuel costs, support from Money
Matters and access to food banks provided J with stability and a foundation to start anew.
Health and Wellbeing
Continuous support from health services helped improve J's physical and mental health,
enabling him to focus on his future.
Achievements and Progress
While pursuing his studies and with ongoing intervention from the Employability Mentor J
actively searched for employment and secured a part-time job as a bus driver. This role not
only provided financial stability but also boosted his confidence and well-being. With his health
improving and life stabilizing, J is now on a more promising path. As his situation improves, J
is more motivated and has started studying IT.
Conclusion
297

Page 298

56 
J's story is a powerful example of how targeted support and personal determination can
overcome even the most daunting challenges. J’s s progress in both his job and health
highlights the importance of comprehensive joined up support systems in facilitating
successful rehabilitation and career transitions.
It also evidence that access to employment with a criminal history is still possible. 
2.3 The Drug Treatment and Testing Order (DTTO) Team have been working in partnership
with Minds of Recovery to deliver a bespoke four-week bite-sized recovery group to service
users on a DTTO community sentence. A DTTO is a sentence imposed by the Courts. It
focuses on drug treatment as the primary means of reducing offending behaviour. Orders last
between six months and three years and combine drug treatment and a testing regime with
regular court reviews, in addition to supervision. 
Mentoring Individuals for New Destinations and Support (MINDS) recovery group explores the
CHIME (Connectedness, Hope and optimism about future, Identity, Meaning in life and
Empowerment dimensions) model of recovery, recovery capitals and the language of
recovery. It also looks at the six stages of change and coping mechanisms to help change the
narrative of addiction and recovery. Service users were mandated to attend once a week for
two hours.
The groups are set up as a conversation café, creating a safe space where service users can
discuss issues relating to themselves. Roles are created within the group, from setting up the
room, making tea and coffee, to helping individuals complete worksheet tasks and tidying up
at the end of group sessions. In one of the groups, with the input from one of the DTTO
Recovery Development Workers, one individual stepped up to volunteering, which involved
connecting with the group by providing input and generating conversation on areas of focus.
Feedback received thus far highlights the positive impact that the recovery group has had on
participants. Improvements in mental health, anxiety levels and overall, wellbeing have been
reported by participants who feel that the provision of this early support in their journey of
recovery has been invaluable. 
Feedback from service users indicate the following:
“I have learned that there are different ways to approach recovery, and being around people
has improved my confidence.”
“Being there and enjoying it made a difference to me.”
“Meeting people has made me realise that I can get somewhere in life.”
“It has helped me in overcoming anxiety.”
“I’ve enjoyed being out of the house and learning new coping mechanisms with people with
the same issues as me, and I’m thinking about attending more groups.”  
298

Page 299

57 
2.4 Case Study: Kilwinning Crazy Golf
North Ayrshire Justice Services Unpaid Work Team are responsible for the delivery of unpaid
work across North Ayrshire and operate from their office and workshop facility in Stevenston.
The Unpaid Work Team were approached by Councillor Donald Reid, looking for assistance
with repairing some of the crazy golf structures at McGavin Park in Kilwinning.
The park consists of a large lawn area and mature trees. It is home to an enhanced play area,
outdoor gym, tennis court and crazy golf. The park is also one of the few to have public toilets
which open during school holidays (April to October) and by prior arrangement for group visits.
The park is managed by North Ayrshire Council although Kilwinning Community Events Group
installed and maintain the sports equipment and much of the play equipment in the park. Part
of the group’s work is to develop the community asset for the wider community, and they rely
on volunteers to help maintain bedding plants, litter picking, to open, close and clean the
toilets, as well as with events at the park.
Councillor Reid, Chair of Kilwinning Community Events said, “the group struggled for years to
get the skill base to renovate the crazy golf and it is part of the park’s history so it was
important the original aspects of the crazy golf were maintained with a Rotary and round table
links to the original project”.
The Unpaid Work Team, led by Supervisor Allan Auld put together a plan to undertake the
necessary work, identifying what material would be required, associated costs and timescales.
Allan worked with his team to create new structures for those that could not be repaired.
Kilwinning Community Events Group were able to provide the materials that allowed the
Unpaid Work Teams to begin work on mending some of the existing structures and clearing
the area for new structures. There were multiple setbacks due to the weather conditions,
which meant concrete could not be mixed and set. During the planning stages Unpaid Work
Teams learned how to think creatively with a vision. Following this, teams learned how to lay
kerb stones, mix concrete, then to pour and level it off, as well as how to add extra fittings
such as pipes, holes, or to create curves and hills. Several of the structures also had artificial
grass, so the teams learned how to measure, cut and then secure this to the structure.
Tracy Nimmo, Unpaid Work Team Manager said “The benefits projects like these bring to the
local community is paramount to reparation and reintegration of our service users completing
the works. Service users get a sense of pride completing visible projects in our communities,
especially ones that make a difference to the children and families that benefit from them. This
crazy golf site has been in disrepair for many a year; to see it restored for families to use in the
summer months is at the heart of what we like to see from the Justice Services Unpaid Work
Team. A service everyone benefits from equally.”
Cllr Reid said “The community feedback has been extremely positive following the works over
the last three years to enhance the parks facilities. The crazy golf restoration is now complete,
and we are grateful to Justice Services for the support to re-establish this feature in the park
for the benefit of visitors. This was one of those projects that simply would not have happened
if it were not for the support of the service. The group was keen to see the works as planned
complete for the 140th anniversary of the park’s gifting to the community”. 
299

Page 300

58 
2.5 The latest Government statistics on Community Payback Orders (CPOs) (2023 to 2024)
show that North Ayrshire had the highest of the Ayrshires with 479 CPOs however was the
lowest of the Ayrshires at 52.5 per 10,000 population. In comparison, East Ayrshire had 473
CPOs and sits at 56.7 per 10,000 population and South Ayrshire had 401 CPOs and sits at
53.7 per 10,000 population. The Scottish average is 39.1 per 10,000 population.
There has been a reduction in the number of Criminal Justice Social Work Reports (CJSW)
since 2020 to 2021 largely thought to be due to the result of COVID-19. 2024 to 2025 sees the
highest number of report submissions since this downward turn, albeit not yet at pre-covid
numbers. The latest Government statistics on CJSWs for 2023 to 2024 reveal North Ayrshire
to have submitted the highest number of reports of the Ayrshires however continue to be the
lowest of the Ayrshires at 73.2 per 10,000 population. In comparison, East Ayrshire sits at 79.4
and South Ayrshire sits at 78.8. The Scottish average is 72.1 per 10,000 population.
Our Justice Services continue to have a positive impact on the local community through the
Community Payback Order (CPO) unpaid work scheme. For over a decade, the twelfth year in
fact we have continuously over-achieved against targets for CPO level 1 and level 2. 2024 to
2025 saw 78 out of 79 level 1 CPO’s completing within timescales and 108 out of 112 level 2
CPO’s completing within timescales. The targets set for unpaid work are pan-Ayrshire targets.
300

Page 301

59 
2.6 There was a marked increase in in Drug Treatment and Testing Order (DTTO) Assessment
and Impositions in 2023 to 2024. There has been a slight decrease in 2024 to 2025; however,
the volume of assessments and new Orders this year remains high. The last two years figures
appear to represent a return to ‘the norm’ following a ‘dip’ attributed to covid. 
Of the 63 assessments completed in 2024 to 2025, 45 new DTTO’s were imposed across
Ayrshire. This incorporates Orders from both Kilmarnock and Ayr Sheriff Courts. DTTO is an
intense Order which involves monthly Court reviews, twice weekly contact for the first month
and weekly oral drug screens. There are three distinct roles within the team delivering the
service and interventions. The Supervising Officer oversees the Order, monitors compliance
and compiles the assessment and review reports. The Additions Worker delivers the
therapeutic interventions and is primarily responsible for administering the oral drug screens.
There are then Recovery Development Workers who provide practical supports, assistance
with welfare needs and also build links and connections within the recovery community to help
build the persons own recovery capital.
A Recovery Care Plan is created with each individual. There are ten domains, including
substance use, relationships and offending, which are scored from 1 to 10. These plans are
updated at three monthly intervals and allows areas for support/intervention to be identified
and progress to be monitored.
301

Page 302

60 
2.7 Diversion from Prosecution (Diversion) has been available since 1997, within this past year
we have experienced a further increase across Ayrshire in assessment referrals from the
Procurator Fiscal. Referrals have increased at a significant rate from 2018. Although this
disposal is early intervention and low-level offending, the presenting need of service users is
extremely high, thus resulting in more staff time being allocated and closer partnership working
with other agencies to provide identified services. 
The number of assessment reports submitted are relatively lower than the number requested
due to limited resources, which has resulted in waiting lists within each local authority area. 
In comparison with last year, 2024 to 2025 notes a decrease in the number of Diversion cases
imposed. This is due to delays from the time that the offence was committed until the
individual is referred to and assessed by the Diversion team. In this time many positive
changes could have taken place and individuals are actively seeking and engaging with
services to address any issues which they may have, thus reducing their risk of further
offending. In these instances, no interventions are required due to positive reasons. 
302

Page 303

61 
2.8 The Justice Drug Treatment and Testing Order Team worked in partnership with ‘Minds of
Recovery’ to deliver a four-week wellbeing programme in North Ayrshire. This intervention
focussed upon Models of Recovery, Stages of change and coping strategies. The evaluation
highlighted those who participated felt less anxious following the intervention with
improvements to mental health due to being able to speak freely about their situation and four
of five stated that they would continue to attend Recovery groups throughout North Ayrshire. 
Participants described recovery as: 
Being happier, having improved confidence, managing a balanced life and enjoying improved
relationships.
Participant Testimonials:
• "I’ve enjoyed being out of the house and learning new coping mechanisms with people
with the same issues as me, and I’m thinking about attending more groups."
• "Learned how to manage negative thoughts and situations."
• "Gained interaction, knowledge, and confidence in speaking more."
After attending Mentoring Individuals for New Destinations & Support [MINDS] participants
gained insight into different Recovery Strategies, coping mechanisms, and self-development.
Three participants have now engaged with groups/support networks out with the class with a
further two contemplating attending other support systems.
These insights and testimonials highlight the positive impact of the MINDS Recovery Group,
demonstrating significant improvements in mental health, anxiety levels, and overall well-being
of the participants.
2.9 MAPPA Level 2 and 3 Chairs came together for a well-received MAPPA training session.
The day was packed with valuable takeaways, including a masterclass on how to effectively
chair a MAPPA meeting, led by Professor Hazel Kemshall, a world-renowned expert on the
subject.
The morning session offered a deep dive into
the intricacies of chairing these important
meetings, with Professor Kemshall sharing
her wealth of knowledge and practical tips.
The session gave attendees a fresh
perspective on best practices and provided an
opportunity for everyone to learn from one of
the leading experts in the field.
In the afternoon, the focus shifted to risk
management, with a presentation by Lauren
McClintock and Eddie Kotrys from the Risk
Management Authority. This covered
essential points on what to look for in a solid
risk management plan, arming attendees with
crucial insights to enhance their work. 
303

Page 304

62 
The feedback has been overwhelmingly positive, with attendees expressing how valuable the
sessions were and highlighting the depth of knowledge shared and the opportunity to network
with peers. 
304

Page 305

63 
Reporting on localities 
North Ayrshire is home to approximately 133,570 people, all living in its
many towns, villages, and islands. These places are home to many different
communities, each with their own characteristics and needs. 
We recognise that a one – size all approach to services delivery is not
appropriate. A blanket service may be of 
great benefit to one community and of little 
value to another. 
That is why we are now designing local 
services based on local need, identifying
the health and social care priorities 
in communities and developing 
services that help people access 
the right services at the right time.
305

Page 306

64 
Locality Planning
Locality Planning is the local mechanism for strategic planning in which local priorities are developed
for smaller geographical areas across the local authority. In 2023 it was decided that the framework
for carrying out Locality Planning would be revised in order to involve new methods for community
engagement and ensuring continued leadership through new Locality Chairs. The HSCP is now
halfway through its 2-year process to carry out extensive research in order to develop locality plans
with localised priorities and actions for each area. The research process involves:
• Engagement: Twice per year, Locality Conversations will be held within each locality in order
to collect information from different people within the communities, and feedback what we are
doing with the information
• Local data: Overall locality data to identify the initial priorities and more in-depth data on
specific issues for each area
• Local services: Mapping the existing services across each locality
• Community Planning: consideration of the existing locality priorities the wider community
planning partnership is working towards
Progress 2024 to 2025
The first set of locality conversations took place between the 15th and 22nd of April 2024 and were in
the form of 2-hour workshops with local staff and members of the public invited to intend. This
allowed us to explain a bit about the new process and collect initial community perceptions and
challenges. There were five workshops held with 32 participants.
In September 2024, local community groups that focussed on people with shared characteristics
were contacted and visited by an Engagement Officer to discuss if there were any specific barriers
experienced to accessing health and social care services as a result of their shared or protected
characteristics. The aim of this was to ensure that the experiences of different equalities groups were
captured in the process, and they were visited at their own spaces to ensure attendance, and over
the month of September, twenty-three groups were visited with 206 participants.
Localities – Initial Insight
Garnock Valley
Garnock Valley seems to sit around the middle of the localities in terms of performance indicators but
is generally still poorer performing when compared to the Scottish figures. In terms of indicators of
poverty its levels of deprivation, employment and house prices all indicate the area does not perform
as poorly as Three Towns, Kilwinning and Irvine, making it often on the lower side in terms of
ranking, but in terms of figures it still shows some higher levels of deprivation. For example, 40.3% of
the population lives within the 20% most deprived areas, but this is still lower than the average for the
area due to the much higher levels in Three Towns, Kilwinning and Irvine. Child poverty is also higher
in North Ayrshire estimated at 29%, and in the Kilbirnie and Beith Ward it is 29.5% 
All areas within North Ayrshire have a higher over 65 population than Scotland, with Garnock Valley
at 21.6% compared to Scotland’s 19.6% and North Ayrshire’s 23.3%, and general health indicators
are also around the middle of the other localities, though Garnock Valley does have highest deaths
306

Page 307

65 
per 100,000 for those aged 15-44. Indicators for Garnock Valley are generally consistent across the
majority of outcomes that they perform better than North Ayrshire but worse than Scotland. This is
why it is important to recognise that although there are other localities with higher poverty and
deprivation, a higher older population, more complex health needs et cetera it still experiences higher
issues when compared to other parts of Scotland. 
So far, 23 people from the Garnock Valley have participated in engagement between the general and
targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement have included:
• Poor transport links across the area and the impact of accessing appointments and work
• Access to GPs and possibility of targeted clinics for key issues in community spaces
• Finding information about health and care services 
• Long waiting lists
• Older population and digital accessibility
Irvine
Irvine is the largest locality in North Ayrshire by population, and one of the more accessible in terms
of local services and amenities. According to data it has much higher levels of deprivation compared
to nationally but is not as high as some of the other areas in North Ayrshire, for example 45.7% of the
population lives within an area that is within the 20% most deprived in Scotland, which is only third
highest locally. For many indicators Irvine performs the poorest other than Three Towns, such as for
drug related hospital admissions, alcohol specific deaths, psychiatric patient admissions. General
health is towards the higher end of the localities but is generally not the worst, though is usually
higher than the Scottish rates, however, has the lowest female life expectancy at 78.5. 
Unemployment is not as high as other areas, the third lowest in the area behind Arran and North
Coast and is about average for Scotland, and Health and Social Work is the second highest
employment sector behind wholesale and retail, and the GVA per capita is higher than average for
the area, possibly due to Irvine being the most populous town in the area. 
So far, 98 people from Irvine have participated in engagement between the general and targeted
equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement have included:
• Low-level social interventions and community support groups in promoting mental and
physical wellbeing
• Affordable leisure options and increased funding and support for community-run initiatives
• Increased patient voice in care planning
• Difficulty in accessing reliable information about health and social care services.
• Outdated or incorrect online information makes it hard to navigate resources
307

Page 308

66 
Kilwinning
Kilwinning performs poorly for economic indicators, with the second highest rate of unemployment
and the second highest proportions of people living within the 20% most deprived area in Scotland,
behind Three Towns for both. Child poverty in the Kilwinning ward is slightly higher than the North
Ayrshire rate, which is higher overall that Scotland, but it increased by 8.3 percentage points between
2021 and 2022. For general health, life expectancy is lower than the Scottish figures and North
Ayrshire averages but are again not as low as Three Towns for male and female, and Irvine for
female. The 65 plus population is the lowest in Kilwinning of all the localities and it has the lowest rate
of delayed discharges of those 65 plus of the localities and the Scottish and North Ayrshire rates, and
the lowest unscheduled acute specialty beds. 
For indicators related to substance use, Kilwinning is around the middle of the localities, but still
higher than the Scottish rates, so when comparing the localities to each other it appears as though
it’s not as big an issue, but this is due to the elevated rates across North Ayrshire. The averages are
also affected by far lower than average numbers for Arran and North Coast and far higher numbers in
Three Towns and Irvine. Similarly for prescribed anxiety medication, the rate is the third highest of
the localities but Three Towns, Irvine, Garnock Valley and Kilwinning are all above the Scottish
proportion. 
So far, 37 people from Kilwinning have participated in engagement between the general and targeted
equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement have included:
• Centralised community hubs and improved transport links to enhance service accessibility
• Increased investment in self-care resources, clearer pathways, shorter waiting times, and
trauma-informed crisis support
• Difficulty accessing information about services and accessing appointments
• Other barriers were discussed such as financial, language, and digital
North Coast and Cumbrae
The North Coast and Cumbrae (NC&C) locality is more affluent than other areas of North Ayrshire,
with fewer areas of deprivation, lower unemployment, and a higher average house price than the
other mainland localities. There is a much higher proportion of older people with 32.3% of the
population aged 65 and over, which is 12.7 percentage points more than the Scottish figure of 19.6%.
As a result, some of the health inequalities in NC&C are more likely a result of the population age
than other areas, for example, the population with long-term conditions is highest in Irvine and NC&C,
but for Irvine it is more likely related to the higher rates of deprivation. 
Despite the older population, overall health indicators are better than other areas, with a high life
expectancy and lower rates of cancer registration, low rates of hospital admission and death related
to substance use, and lower rates of anxiety medication and psychiatric admissions. These may also
be related to the area’s affluence when compared to the other localities. 
308

Page 309

67 
The only health indicator in the initial profiles that is higher in NC&C is unscheduled acute specialty
bed days per 100,000 population. Emergency admissions and A&E attendances aren’t particularly
different for the area so this may also relate to the older population. 
So far, 21 people from North Coast have participated in engagement between the general and
targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement have included:
• Importance of low-level and community-based support, particularly more services around
dementia and learning disability 
• Poor transport links and access to patient transport
• HSCP money allocation, and how this is communicated or understood by the public
• Care packages and decisions around them
Three Towns
The Three Towns locality has poorer outcomes in many indicators when compared to the other
localities, as well as the national rate. The performance indicates that the Three Towns locality
experiences higher rates of poverty and socio-economic disadvantage. The locality has the highest
level of people living within the 20% most deprived areas of Scotland at 57%, and also has the
highest rates of child poverty, and the highest unemployment rate of the localities, as well as lower
house value and more lower council band properties than other areas. 
Areas with higher levels tend to have poorer health outcomes, which is evident in the general health
indicators. Three Towns has the lowest life expectancy rates, as well as high rates of emergency
admissions. The Three Towns locality has the highest figures out of all the localities and is much
higher than the Scottish and North Ayrshire averages for indicators related to alcohol and drugs, and
alongside Irvine has the highest rates for indicators related to mental health care. 
So far, 19 people from Three Towns have participated in engagement between the general and
targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement have included:
• Accessibility of primary healthcare services, particularly the challenges in booking
appointments, long waiting times, and the difficulties faced by those with mobility issues
• The impact of social deprivation on mental health was noted, alongside the necessity for
targeted support across various stages of mental health issues, from prevention to post-crisis
care
• Difficulty accessing information about services or knowing where to go
• Discussion of methods to reduce harm from drugs and alcohol, to improve safe drug use and
reduce stigma
309

Page 310

68 
Arran
Arran has an established locality planning arrangement which has been in place for many years due
to the specific and persistent challenges of the Island. These arrangements have a governance that
sits under the Island Plan and the Health and Social Care Partnership will develop health and social
care priorities for Arran under this existing governance structure and using engagement that has
already been carried out with the islanders. This will occur using the same timescales as our
mainland localities.
The Key themes of the Arran Island Plan are:
• Economy
• Community
• Environment
A Health and Social Care Locality Plan for Arran will be consistent with these existing themes and
aim to focus on how health and care needs will be met in Arran.
Planned Activity
Over 2025 to 2026, the HSCP will carry out engagement with children and young people, and further
engagement with services users in September 2025. Collected data will be analysed to inform each
locality’s priorities, and the data and engagement will be analysed to identify the key priorities.
The Strategic Plan is currently under revision and once complete, Locality Plans will be developed
and published for each locality and annual reporting for each will commence.  
310

Page 311

69 
Transformation Programme 
North Ayrshire HSCP’s Transformation Team support 
Partnership teams to identify, develop and deliver
system wide change to local services and
improve outcomes for the people of North
Ayrshire 
311

Page 312

70 
Transformation 2024 to 2025
The North Ayrshire HSCP Transformation Plan 2024 to 2027 is an ambitious programme of change
consisting of a range of improvement and reform projects across all service areas, each aiming to
improve the quality of our services and contribute to the long-term sustainability of health and care in
North Ayrshire. The Transformation Plan was approved by IJB in March 2024. 
Through 2024 to 2025 the financial outlook has deteriorated, and the need for transformation and the
redesign of services has become more urgent and more important to the long-term sustainability of
the functions for which we are responsible. At the same time our capacity for change is diminishing
due to increasing demands on people’s capacity including the short-term actions required to deliver
the financial recovery plan, however, progress has been made. There are 79 change projects and
programmes on the plan, from across every area of the partnership. Included below are some
highlights of key activity and general updates on progress made in 2024 to 2025. This includes £1.7
million overspend reduction. 
Key Activity
In April the Transformation Board agreed governance and approach, including Terms of Reference,
format of meetings, and project management methodology (including template documents). It was
agreed that each meeting would have a ‘Focus On’ a specific area of the Transformation Plan, but
with space on the agenda for raising Risks, Issues, Requests, or Successes from any area of the
plan, particularly where a time-critical decision is required.
May had a ‘Focus On Transformation’ and the board was updated on Workforce Planning and agreed
to the development of a HSCP Digital and Data Plan. Also in May, two members of the
transformation team were successful in achieving a fully funded place on Cohort 23 of NES' Digital
Health and Care Leadership Programme (DLP). This programme supports Scotland's Digital Health
and Care Strategy and Delivery Plan and aims to: maximise the potential of digital solutions to benefit
people; and, to support participants to develop the strategic leadership skills required to influence the
use of digital solutions in health and social care delivery.
In June ‘Focus on Adult Health and Community Care’ had seven new projects being initiated in that
area, and an additional project request approved. June also saw the first Ayrshire-wide Innovation
Network Event with over 80 attendees and presenters from across Scotland sharing examples of
innovation to support transformation of health and social care services across Ayrshire.
During August ‘Focus on Mental Health and Learning Disabilities’ had eight new projects initiated.
In September a new online Tracker was
launched to provide ongoing real time
monitoring of projects. The Tracker is linked
to a dashboard to provide a visual
representation. 
The second Ayrshire-wide Innovation Event
took place on 10th September and had a
range of examples of innovation and
transformation, including an overview of a
new companion robotic device from the
312

Page 313

71 
National Robotarium, as part of an early intervention and prevention model of care.
In October the Transformation Board was updated on the progress of the new Digital and Data Plan
which consists of a Landscape Review and a Phase 1 Delivery Plan. The Landscape Review
includes: an outward look across the sector, including national digital and data strategies; and inward
look incorporating the staff digital experience survey, case studies, and local plans and strategies.
The Delivery Plan, informed by the Landscape Review, aims to address immediate priorities and
establish a solid foundation for longer term transformative improvements. Priorities for this plan
include improving access and supporting the workforce to develop essential digital and data skills. An
overview will be presented to the Strategic Planning Group in March.
Also, in October the Senior Manager (Strategic Planning and Transformation) was successful in
securing a funded place on MSc in Leading Digital Transformation in Health and Social Care in
Scotland delivered by the Usher Institute at University of Edinburgh and aims to “enhance the ability
of current and future leaders to drive, deliver and embed digital transformation across Scotland’s
health and social care services”.
In December the Transformation Board focused on some key partnership-wide programmes including
an update on the Carers Strategy and an update on the Self-Directed Support Learning Review
Implementation, as well as an overview of the initial findings from the Accessing Health and Care
Service Review.
Also in December, the Service Lead for the Tech First Programme in Health and Community Care
was successful in achieving a fully funded place for the Professional Development Award Technology
Enabled Care starting in January 2025. The qualification is designed to “empower individuals to
evaluate and adopt technologies that support health and care delivery while reflecting on how these
could be used to assist people to self-manage and live independently”.
The third Ayrshire-wide Innovation Event took place on the 3rd of December and included: an
overview of the new Digital Capability Framework and supporting resources from the Digitally
Enabled Workforce Team at NHS Education Scotland; a demo of the Seer 2 platform which provides
national technology and infrastructure capabilities for data management and analytics for health and
social care across Scotland; and an overview of how NearMe is used in South Ayrshire.
January had a ‘Focus on Adult Health and Community Care’ with a review of 2024 to 2025 and five
new projects initiated, as well as the successful closure of the Blue Badges project. 
February was a ‘Focus on Children, Families, and Justice’, with a review of 2024 to 2025 and a deep
dive into the progress of the Brighter Pathways programme. 
March saw our fourth Ayrshire-wide Innovation Event with colleagues from Public Health Scotland
presenting their Innovation Strategy; the Service Design Academy provided an overview of their
approach (which is the Scottish Government approach) to service design. We also had colleagues
from South Ayrshire sharing their new Integrated Impact Assessment, as well as a useful recap from
the Digital Health and Care Scotland 2025 conference in Edinburgh. 
The Health and Social Care Transformation conference 2025 was also in March, and North Ayrshire
was well represented, learning about the progress of the national Digital Front Door programme as
well as other policy and strategy updates, alongside a range world-class industry and health and
social care speakers. AI was a key theme with a number of impactful examples from the health
sector. 
313

Page 314

72 
March saw a ‘Focus on Mental Health and Learning Disabilities’ with a review of 2024 to 2025, one
new project was initiated, and one new project added to the Plan. 
Updates by Service
Children, Families and Justice
Housing & Throughcare 
The biggest challenges facing both the Housing & Throughcare Teams is the growing number of
Children & Young People being looked after & accommodated vs the lack of suitable
accommodation/placements across our Residential Housing establishments, private residential care
providers & our Housing Estate across North Ayrshire.
Given the challenges, the workstream acknowledged that action was required to improve
communication, in addition to this, integrated processes were required to ensure young people
leaving care were both supported & allocated suitable and appropriate housing when they were ready
to leave their care setting.
The Services indicated that there had been situations where young people in residential care were
approaching twenty-one years of age and there was no allocation of housing, or a transition plan, for
these young people.
Supported Accommodation 
Workstream members have indicated that they feel there is a need to create more space within our
Residential Estate, there have been initial discussions around the proposal of a supported
accommodation facility, one that would support young people over sixteen to move on to independent
living with twenty-four-hour staffing support. 
This would be with a view of providing a stepping stone for young people moving on from care, and to
equip and prepare them for independent living. 
The workstream members have expressed a desire to explore this in the future. 
Fostering & Kinship Workstream
Our aspiration is that children who require alternative care are best placed in family-based care, and
we require a number of new foster carers to meet the current demand for children of all ages. 
The biggest challenge facing the fostering sector today is the recruitment and retention of high-quality
foster carers who can meet the needs of children in care. A lack of available foster carers, in the right
place at the right time, means children are missing out on vital support. Children in need of care are
at risk of being moved away from their communities, hobbies, siblings, and are having to change
schools and leave behind what is important to them, which has a detrimental impact on their
wellbeing, stability and development. 
The Fostering Service has lost fifty-nine interim carers over the last two years, this is due to
resignations, de-registrations and change of role of carers.
314

Page 315

73 
The service has a target to recruit six new carers per year; however, this has not been achieved in
each of the last five years. Within the foster care workstream, recruitment of foster carers was
identified as a priority area that required immediate focus.
New Fostering Scheme
To assist with the recruitment of foster carers, a new scheme has been developed, however, the
Scottish Government have indicated that they are reviewing this, it will be discussed at future
workstream’s as to whether or not North Ayrshire will pursue a new scheme or await further
instruction from the Scottish Government.
CAN Digital 
The programme board and PSMT have approved the funding for the Council Advertising Network to
support foster care recruitment. This development will also provide a separate webpage for the
fostering service that will improve user experience and journey, alongside targeted digital recruitment
strategies that have proven to be successful, with increased recruitment activity and conversions to
approved quality foster carers. 
The Council Advertising Network have developed a fostering webpage for the service and the search
engine optimization was started on 11th November 2024. 
Best Practice Models & Research 
The focus of this workstream was on residential care and family-based care, data presented
indicated that there was a high number of children in internal residential care and external residential
care, who had previously been in kinship care and internal foster care provision. Furthermore, there
was also a number of children in external residential care who were previously cared for within
internal children’s houses. The workstreams focus was on how best we can support foster carers,
kinship carers and internal residential houses to better support children and young people with
complex needs and behaviours, with an objective to sustain their placement and provide better
outcomes and prevent escalation to external high-cost resource. To date the following areas have
been progressed:
Psychological consultation and clinical support to one of the residential houses as a pilot to support
staff to manage specific children’s behaviours. This will be evaluated and considered for other
houses and children in foster care. 
315

Page 316

74 
Health and Community Care
Care at Home Recruitment: Family Participation
Our care at home team remains dedicated to involving service users and their families in recruitment
events. Family members can drop into these events, meet the team, and discuss the care provided to
their loved ones. During these sessions, the team has received appreciation from families for their
compassionate care and efforts to address any concerns. This feedback highlights the team's
commitment to delivering high-quality, empathetic care as well as to ensuring that families feel
empowered to discuss their concerns openly and fully.
New Managers Training
A 5-week course was recently offered to Care at Home Managers, covering areas such as HR
policies and procedures, budgets, trauma, child protection, adult support and protection, complaint
handling, leadership, supervision, transitions, business administration, and evaluation. Attendees
rated their knowledge increase from 50% to 86%, and all those who attended noted they would
recommend the course to others. This training is crucial for developing and supporting our workforce.
Lady Margaret Hospital 
An executive leadership visit to Lady Margaret Hospital on the Isle of Cumbrae took place on 15th
May 2024. It is recognised that working on an island comes with its challenges; however, the visit
was extremely positive. Feedback from the visiting team recognised the dedicated and collaborative
island-based team who work to ensure that the community is at the heart of everything they do. The
Leadership team commended the service for their commitment to continuous improvement by
recognising and tackling challenges head-on. Staff found the visit supportive and were pleased with
the recognition of the work they do on the island to support the whole community. 
Care at Home 
Our commitment to supporting our staff with the necessary skills and resources is central to our
service delivery. Recently, our ‘Frontline Event’ for Care at Home Assistants focused on skill
enhancement, employee development, networking, and wellbeing. Staff participated in workshops,
feedback sessions, and peer interactions. Invited speakers covered essential topics such as tissue
viability and stoma care. The event was described as powerful, grateful, and inspiring by attendees.
Arran Services: Recruitment
Our Arran team has proactively addressed recruitment challenges by working with a recruitment
agency, resulting in a significant increase in applications and new appointments. From January to
August 2024, we focused on roles such as Advanced Nurse Practitioner, Advanced Pharmacist
Practitioner, Social Care Worker, Care at Home Assistants, and more. The recruitment ads received
approximately 8,500 clicks, 6,000 revisits, and 636,800 views.
Blue Badge Service Review
The Blue Badge project successfully established an efficient, technology-driven delivery service
model that complies with national standards and enhances the end-user experience. By moving to a
fully electronic online application process, the team now processes applications within one working
day, with no backlog or waiting list. Payments are handled electronically, and a limited call-back
service is available for those unable to access online forms. The team's commitment and innovative
316

Page 317

75 
approach have led to timely Blue Badge issuance, reduced FOI and councillor enquiries, and
improved staff motivation. The refreshed approach aligns with strategic priorities, providing earlier
support for those with mobility issues. Performance monitoring ensures any issues are promptly
addressed.
Transformative Care Pilot (Multiple Sclerosis)
NHS Ayrshire & Arran, in partnership with Coloplast Ltd, launched a successful pilot service to
improve the lives of people with multiple sclerosis (MS). This innovative service focuses on managing
neurogenic bladder and bowel dysfunction, a common issue for people living with MS. Key
achievements include the introduction of a dedicated bladder and bowel clinical nurse specialist,
early detection through patient questionnaires, and significant reductions in urine retention and
urinary tract infections. Patients have experienced improved health outcomes, enabling them to
engage more fully in work and social activities. This pilot sets a new standard for MS care,
demonstrating the benefits of early intervention and integrated care pathways.
Ward 2 Palliative Care Pilot
Ward 2 launched an innovative pilot programme to receive direct referrals from North Ayrshire GPs,
in collaboration with District Nursing, for patients requiring palliative and complex care. This initiative
aims to reduce the need for acute admissions, providing a more seamless and compassionate care
pathway for patients. The ward has successfully integrated community referrals and is working to
strengthen links with GP practices and District Nurses. Collaboration with Ayrshire Hospice is
ongoing to develop comprehensive education and training programmes for staff, focusing on key
aspects of palliative care, particularly pain management.
Home from Hospital Support (Red Cross)
The Home from Hospital Support service, provided by the Red Cross, has achieved significant
milestones in offering essential support to individuals during hospital stays and their transition back
home. Key achievements include regular check-in calls to ensure safety and well-being, assistance
with shopping and financial tasks, and providing companionship. This service has been instrumental
in reducing feelings of isolation and ensuring continuous support until no longer needed. The
dedication and kindness of the Red Cross staff and volunteers have been widely appreciated,
highlighting the positive impact of their efforts on the community.
Anam Cara Respite Centre 
The team at Anam Cara continue to offer outstanding care and support to those in their care.
Recently, a social and outgoing service-user, whose primary priority was her family, was resident in
the centre. The feedback from her family underlines the difference this service can make to local
people and their loved ones. The family were delighted that their loved one had remained settled
during the respite period, enabling them to benefit from a break from their caring role (a role which
can be emotionally demanding), and giving them the peace of mind to confidently book another
period of respite. The family gifted the centre a piece of artwork noting their thanks. 
Emergency Ambulance Service 
Our Emergency Ambulance service was also praised by an elderly service user for the prompt
attention given when they intervened to support them after they had overdone their daily exercise
317

Page 318

76 
regime. The team were recognised for their “cheerful competence” which was found to be “truly
impressive.”, with the service user concluding “how fortunate we are to have people like this.” 
Dementia Support
The Dementia Support service has made significant strides in providing essential social stimulation
and support to individuals experiencing cognitive impairment. Through patient and reassuring
communication, the team take time to explain the benefits of the service and ensure service-users
feel in control of their care. They develop bespoke support plans and focus on engaging service-
users in meaningful conversations about their emotions and memories. This approach helps build
trust and leads to active and joyful participation in support services. The success of this initiative
highlights the importance of personalized care and the positive impact of early and effective support
on mental and emotional well-being.
Money Matters
The Money Matters team is engaged in a two-year initiative to implement Welfare Rights services
within eleven GP practices throughout North Ayrshire. Since the project's inception, three Income
Advisers have secured nearly £4 million in benefits for local patients and residents. A notable
achievement involved assisting an individual with unrecognized learning challenges who faced
escalating mental health issues due to the demands of Universal Credit. The team provided
comprehensive support, including overturning a Universal Credit penalty, filing for Adult Disability
Payment, navigating the 'unfit for work' designation process, and facilitating a successful bus pass
application. As a result, the individual now benefits from an extra £158 weekly and has received back
payments exceeding £6,000. This initiative highlights the team's dedication to tackling inequalities
and improving the financial well-being of the community. 
318

Page 319

77 
Mental Health and Learning Disabilities
Woodland View Models of Care
Work on these projects was started within Inpatient teams and the wider partnership. After further
thought and review, a wider programme board has recently been established to bring these projects
along with transformation work at Ayrshire Central Hospital Community Wards under one Ayrshire
Central Hospital Transformation Programme Board. The Project Initiation Document (PID) for this
work has been drafted and presented for sign off from the Transformation Board at the meeting on 18
March 2025. It is anticipated that this new structure will generate an integrated approach across all
wards and develop the best possible outcomes and savings for the entire site.
MAT Standards
Medication Assisted Treatment (MAT) Standards continue to be monitored closely by the national
MAT Implementation Support Team (MIST). A new RAG rating is expected for North Ayrshire on the
Implementation of all MAT Standards. Work continues on how this is implemented in the Justice
setting as well as expansion of the programme to stimulants and benzodiazepines. The model of
MAT 7 delivery in Primary Care continues to be refined with learnings from the roll out however
annual delivery costs of £110,580 remain unfunded as of March 2026. An evaluation of this delivery
model will be completed and presented to relevant groups including the Transformation Board by the
end of 2025.
Child & Adolescent Mental Health (CAMHS) & Community Eating Disorders Service (CEDS) 
CAMHS in A&A are continuing to engage in and influence West of Scotland CAMHS pathways and
service developments such as FCAMHS. 
West Road in Irvine will be the new Specialist CAMHS Assessment & Treatment Centre for Ayrshire
as well as the operational base for the Community Eating Disorders Services by April 2025. Some
administration staff are already based at the building and the rest of the staff will be moving in once
the staff attack alarms are completed and a few other issues are resolved. Open seven days per
week, specialist CAMHS Neuro, ADHD, play Therapy and other Clinical Interventions will be
delivered from this re-fitted facility. Hosting flexible working space for staff with five clinic rooms and
two large meeting rooms, it is envisaged that the facility will become a centre of excellence in the
care and treatment of child and adolescent mental ill-health and eating disorders.
A review of the Community Eating Disorder Service is due to be delivered in 2025 to 2026. This
project is currently paused until the end of March in order to revisit the PID and agree a way forward.
The budget for this service is within the core CAMHS budget and is currently being assessed for
reductions to bring spending into alignment. The delay is not anticipated to impact the completion of
the project.
Digital Transformation
The Mental Health Digital Transformation Group is monitoring the implementation of digital
transformation projects across Mental Health on a pan-Ayrshire basis. A commissioned review of
Mental Health services in alignment with the national strategy has been completed and presented to
the group. 
The implementation of TrakCare Patient Management System continues. This implementation is
scheduled for completion by March 2026. Some benefits of this project around the shutdown of
319

Page 320

78 
access databases are lagging as the development of reports is currently lagging behind the service
implementation. Meetings have been taking place to progress this and close the gap however the
impact of not closing databases down could impact on the ability for Admin teams from all
partnerships being able to free up resources for the Referral Management Service, which is required
to get the last large service, Learning Disabilities on to TrakCare.
The use of the Strata Health system is being assessed for use in Mental Health. Possibilities exist
with Wellbeing services and Community Mental Health Teams. The contract for this system has one
more year before prior to optional roll over and a decision will need to be made whether it should
continue by May 2025.
Alignment to Scottish Government Specifications 
The introduction of new specifications and strategies since 2023 has given Mental Health services a
clearer set of guidelines to work to. Some of the alignment to these standards is being looked at
within other transformation projects detailed above, including the Adult Community Mental Health
Service and Community Eating Disorders Service. Alignment to the Psychological Therapies
Specification is being governed by the Psychological Therapies and Interventions Clinical
Governance Group (PT&ICGG) and a workstream has been established to look at scoping and
benchmarking all teams that provide psychological therapies across Ayrshire & Arran utilising the
newly released self-assessment tool from the Scottish Government.
Community Mental Health & Wellbeing
Within Adult Community Mental Health and Wellbeing there are a couple ongoing pieces of work. The
Adult Community Wellbeing project has developed a conceptual model for the future of wellbeing
services in North Ayrshire. Against this future concept, current commissioned and in house services
were looked at and prioritised in order to develop a path to delivering Wellbeing services for £100,000
less on an annual basis starting in 2025 to 2026. The project team made the recommendation to
PSMT in February to reduce KA Leisure Services by eliminating a separate stream (Mind and Be
Active) for people with Mental Health or Wellbeing concerns. This reduction will deliver approximately
£90,000 savings in 2025 to 2026 and £121,000 annually from 2026 to 2027. In addition, the project
team will be seeking match funding for HARP services with KA Leisure from Acute Services and re-
tendering for a combined Wellbeing and Recovery College, Peer Support and exercise provision with
the anticipation that this combined scope can provide these services at a reduced cost.
A review of the Adult Community Mental Health Service was paused for a short period while work
was progressed with the Wellbeing services. This work is now looking to get picked back up following
financial discussions which may impact the scope of the service or services directly impacting this
one. Engagement with staff and service users has been completed, research around prevalence of
mental health conditions and some data analysis has been completed. The project aspired to create
a data dashboard for the service on the back of this data analysis which could provide a baseline for
any change recommendations coming out of the project and evidence performance against the Core
Standards for Secondary Services from the Scottish Government. This has been delayed and a new
project request to give this project more visibility has been created.
Work has commenced on the creation of a new Early Intervention in Psychosis service. A team
leader has started and working with HIS leads to test their implementation guide. The second team
member is due to start March 2025 with the service on track to launch June 2025. 
320

Page 321

79 
Reporting on lead partnership responsibility 
North Ayrshire Health and Social Care Partnership has lead
responsibility for: Mental health services (including psychology, CAMHS,
learning disability assessment and treatment) Child health services
(including child immunisation and infant feeding) 
East Ayrshire Health and Social Care Partnership has lead responsibility
for primary care and urgent care services. Primary care refers to the four
independent contractors who provide the first point of contact for the
Ayrshire and Arran population. These contractors are General Practitioners
(GPs), Community Pharmacists, Optometrists, and General Dental
Practitioners. 
South Ayrshire Health and Social Care Partnership is the lead
partnership for the Integrated Continence Service, Community Equipment
Store, and the Family Nurse Partnership (FNP). This lead responsibility
relates to the delivery of continence care and education across Ayrshire,
provision of equipment to people living in the community and supporting
first-time mothers aged 19 and under through an intensive preventative
home visiting programme delivered by FNP.  
321

Page 322

80 
Mental Health Services
1.1 Trindlemoss Day Opportunities in Irvine has been praised in a report by the Care
Inspectorate after an unannounced inspection visit in October, with the majority of areas
looked into being rated as ‘very good’ by the national regulatory body.
The service, which opened in 2020, provides tailored support for over 100 people with learning
disabilities from its base in Tarryholme Drive in Irvine.
The inspector identified a number of significant strengths within the service, with customers
found to be ‘supported in stable groups by consistent staff who know them well’. The ‘warm,
respectful and kind interactions between staff and people supported’ were also highlighted in
the report.
Support was found to be tailored to
each individual’s identified
outcomes, with the service
maintaining a flexible approach that
allows customers to access a range
of groups and activities of their
choice. Regular project topics also
provide multiple opportunities for
themed activities and trips to
associated places. 
Health promotion and education is integrated into activities, empowering people to take control
of their health and wellbeing, with the service also making use of local facilities such as the
swimming pool and gym. These trips also provide a chance to enhance travel and life skills.
Trindlemoss Day Opportunities was also praised for its strong links to the local community,
providing support for lunch clubs, play groups and dementia support groups, as well as
assisting with gardening and litter picking.
Additionally, the Baristamoss Café is open to the local community several days a week,
providing employment training and boosting the development of social skills for those
supported.
In terms of staffing, employees were described as enthusiastic and knowledgeable, putting
customers at the centre of all they do. Staff reported that they were able to spend quality time
with individuals and get to know them well, and support was found to be provided in a timely
manner. Good relationships were noted between staff and management, with appropriate
checks and audits in place for the service type.
The Trindlemoss facility was commended for being clean and well maintained, offering a
generous amount of space split into zones allowing multiple activities to take place at the
same time. The gardens were described as ‘well maintained’ and used for a number of
activities - including growing vegetables - and areas such as the training kitchen and laundry
area provide important socialisation and life skill development opportunities.
1.2 The festive season at Trindlemoss was filled with joy and community spirit, thanks to the
dedicated efforts of our Care at Home team. On Christmas Eve, service users enjoyed a cosy
322

Page 323

81 
Christmas-movie afternoon complete with hot chocolate and sweet treats. Christmas Day was
a heartwarming experience as our team spent the morning with service users, helping them
open presents and providing assistance in their homes. A special Christmas lunch was
organised in the Club Room at Trindlemoss Day Opportunities, creating lasting memories for
everyone involved. The festive spirit continued on Boxing Day with a two-course meal
delivered to each service user's home, and on New Year's Day, our teams prepared and
delivered a special steak pie dinner. These efforts ensured that that people felt valued and
included throughout the holiday season.
1.3 Collaboration with the Scottish Commission for People with Learning Disabilities around a
digital inclusion project now also involves Scottish Care as a key delivery partner, building on
their existing implementation of Care Technologist roles in East Ayrshire and elsewhere. The
work will involve understanding and connecting existing digital inclusion activity in North
Ayrshire and how this benefits people with learning disabilities, with a view to developing
frameworks and resources which can be easily sustained locally and replicated elsewhere.
While this work is focused around the digital exclusion of people with learning disabilities, it
has the potential to benefit others, through its inherent focus on accessibility. 
1.4 A new facility at West Road for N-CAMHS (Neuro CAMHS) and CEDS (Community Eating
Disorder Service) will result in an improved environment to carry out physical examinations
and improve the wellbeing for patients and staff in the facility. Previously physical
examinations were being carried out in environments which were must less suitable. The
newly refurbished facility will enable a much safer and hygienic environment which the
workforce have been involved in designing. The majority of building work was completed by
the end of 2024 to 2025 with an official opening hoped to take place during summer 2025. 
1.5 The Medication Assisted Treatment Implementation Support Team (MIST) has awarded
North Ayrshire HSCP all green and provisional green in their benchmarking report for all
partnerships. This is the highest level attainable in the implementation which supports the
Scottish Drug Deaths Taskforce’s aim to have no barriers to accessing treatment and care that
supports an individual’s recovery. The Medication Assisted Treatment (MAT) Standards
project is focused specifically on improving access to these treatments in order to prevent
deaths, reduce harms and promote recovery opportunities.
1.6 This April saw the first of our mental
health and wellbeing Connect events
across North Ayrshire. This was a
great success with fifty individuals
signing up to join us on the day and a
further forty staff and services
supporting the event.
A range of mental health services and
supports such as NHS 24, Penumbra,
Money Matters and Voiceability
provided stall information for people
to explore and workshops were
delivered throughout the day allowing
the community to find out essential
information and new skills around
self-care relating to wellbeing.
323

Page 324

82 
We will run two or three of these Connect events each year around different themes relating to
mental health and wellbeing. 
1.7 NHS Ayrshire & Arran has officially opened a new, nurse-led Mental Health Unscheduled
Care Assessment Hub. Recognised as the first of its kind in Scotland, the hub aims to deliver
a new model of care.
The Mental Health Unscheduled Care Assessment Hub, based at Woodland View in Irvine,
provides a patient-focused, therapeutic space to support the delivery of compassionate care to
those individuals with acute mental illness who would be eligible to access an adult acute
mental health bed for ongoing intensive assessment.
Managed and coordinated by the Mental Health Unscheduled Care
Service, the hub provides 24-hour access to mental health
assessment and interventions. The service is delivered by
experienced Registered Mental Health Nurses within a therapeutic
environment for a period of up to 72 hours and will be able to
accommodate up to five patients. 
North Ayrshire Health & Social Care Director, Caroline Cameron
explained, “We are delighted to be able to officially open this new
service.
“We piloted the hub earlier this year for a small number of patients.
We are now ready to open at full capacity and provide those living
in Ayrshire and who are experiencing acute mental illness with this
new way of working.”
The hub aims to:
• Improve the patient journey through the Mental Health Unscheduled Care Service
• Facilitate closer working and a smoother patient journey between community and
inpatient services
• Reduce the number of unscheduled admissions to acute adult inpatient mental health
beds
• Reduce the waiting time for planned adult acute admissions
• Reduce the number of initial assessments carried out in acute wards releasing resource
for treatment
• Provide training opportunities in assessment of mental illness for clinical staff
1.8 A huge congratulations to North Ayrshire Wellbeing & Recovery College on winning the
‘Best Mental Health Support Service’ at the Mental Health and Wellbeing Scotland Awards
2025. The category celebrates organisations that provide exceptional help to individuals
through their daily actions and activities.
324

Page 325

83 
In addition, Recovery College manager Jeanette Allan picked up the ‘Inspirational Leader’
award at the event for her dedication to improving the mental health and wellbeing of those
who use the service.
The awards were presented at an event
held in February at Edinburgh
International Conference Centre. 
In what has been a busy time for the
Recovery College, the organisation also
officially celebrated the move to its new
base at Ayrshire College. The event was
attended by key figures, including
Ayrshire College management, Recovery
College leadership, service partners, staff
and peers.
The move from Ardrossan to Ayrshire College represents a significant step forward for the
Recovery College, providing students with an enriched learning environment. 
Funded by NAHSCP, the Recovery College is one of only five such services in Scotland,
focusing on self-management for mental health and providing a strengths-based approach to
learning and recovery. 
325

Page 326

84 
Child Health Services
2.1 Following a budget realignment, the Children and Families Health Team have been able to
recruit a third Perinatal Mental Health Nurse to the Perinatal Wellbeing Team on a permanent
basis. This takes the staff to 2.6WTE. They continue to operate as an integrated part of the
health visiting teams providing one to one and group support to expectant and new mums
experiencing low level mental health difficulties. The team continues to be a valuable asset to
the Children and Families Health Team and to North Ayrshire more widely, meeting a need in
the community for mental health support of this nature.
2.2 The Health Visiting service in North Ayrshire continues to fully implement the national
Universal Health Visiting Pathway, with all children under 5 and their families offered a
minimum of 11 visits from the ante-natal period through to the child starting school.
Developmental assessments are undertaken at 13-15 months; 27-30 months and 4-5 years.
Since 2020, the percentage of children with one or more developmental concern at these
assessments has increased as shown in the table below: 
A slight improvement in developmental concerns at the 27–30-month assessment has been
observed in the last twelve months but a significant increase in concerns at the 4-year review
have also been noted, as well as a slight increase in concerns at the 13–15-month review.
This trend is not unique to North Ayrshire and the Scottish Government has set out actions to
attempt to address this nationally within the recently published Enhancing the Delivery of the
Health Visiting Service: Scotland’s Health Visiting Action Plan 2025-2035 (Scottish
Government, 2025). Locally, we have undertaken a review of our Early Years Support Team
and have established closer working relationships with early years education colleagues to
take forward a programme of work that includes improved information sharing about
developmental concerns at an earlier stage; enhanced links between the HV service and early
years establishments; a focus on communication needs in children as a priority within our
Getting it Right for Every Child (GIRFEC) Steering Group; and shared work around supporting
more children to be toilet ready in the early years.
326

Page 327

85 
Our Early Years Support Team works alongside the Health Visiting team to provide support to
families when developmental concerns are identified or when a family requests additional
support in other areas. During 2024 to 2025, 933 children and their families were supported,
an increase of 10.3% from 2023 to 2024, in areas such as communication, sleep, toileting,
home conditions, parental mental health and routines.
During 2024 to 2025 we expanded our partnership with national charity Dads Rock to bring a
second dads’ worker to the area. This has allowed us to offer one to one and group support to
dads in the Irvine and Kilwinning areas, as well as the original Three Towns area. During 2024
to 2025, 53 dads have been supported with 81 children being positively impacted.
2.3 Breastfeeding rates have shown the biggest improvement in 20 years in North Ayrshire. The
published data for 2023 to 2024 has shown the following improvements in breastfeeding
indicators from an NHS Ayrshire and Arran perspective:
Indicator 2022/2023 2023/2024
% breastfeeding at initiation 54.6 57.6
% exclusive breastfeeding at first HV contact
(10-14 days)
27.4 30.5
% exclusive breastfeeding at 6–8-week HV
assessment
22.8 25.6 
Similarly, the published data for 2023 to 2024 has shown the following improvements in
breastfeeding indicators from a North Ayrshire perspective:
Indicator 2022/2023 2023/2024 Variance
% breastfeeding at initiation 53.0 59.6 6.6%
increase
% exclusive breastfeeding at first HV
contact (10-14 days)
23.2 30.5 7.3%
increase
% exclusive breastfeeding at 6–8-
week HV assessment
20.3 25.6 5.3%
increase 
The benefits of breastfeeding on the short and long-term health of mothers and babies have
been well documented. It promotes optimum nutrition, growth and development for babies, as
well as providing comfort and protection from infections. As such, breastfeeding is actively
promoted and supported in a wide range of settings across North Ayrshire and Arran.
North Ayrshire Health and Social Care Partnership’s Children and Families Health Team has
prioritised investment in infant feeding support through local health visiting teams, as well
expanding the Scottish Government’s Breastfeeding Friendly Scotland (BFS) scheme in North
Ayrshire and providing additional specialist support for families with more complex feeding
issues via the Community Infant Feeding Team.
2.4 Child healthy weight is a public health priority. Over the last three decades, obesity levels in
children and, indeed, the wider population have increased, with inequalities observed across
our communities. Maintaining a healthy weight throughout childhood is associated with many
health benefits both in the short-term and the medium term. 
327

Page 328

86 
Child healthy weight is monitored throughout the universal Health Visiting pathway but also
when a child moves into Primary 1. The most recent data for 2023 to 2024 was released in
December 2024. For North Ayrshire:
• 74.8% of P1 children were of a healthy weight
• 12.4% of P1 children were at risk of overweight
• 11.9% of P1 children were at risk of obesity 
2.5 The Human Papillomavirus (HPV) vaccine helps protect
people from HPV-related cancers and 90 per cent of genital
wart infections. Getting the vaccine protects young people
against future risks. An envelope with an information booklet
about the vaccine, ingredients and any side effects, as well
as a vaccine consent form, was given to all North Ayrshire
S1 pupils and any older eligible pupils with incomplete
courses in January 2025. During 2023 to 2024, the most
recent reporting year, 80.6% of eligible North Ayrshire young
people had received the HPV vaccination by S4.
2.6 The School Nursing service in North Ayrshire continues to offer support to school-aged
children and young people on a range of areas from emotional wellbeing and substance use to
sexual health and relationships and transitions. A significant part of their role in supporting
health and wellbeing needs of children on the Child Protection Register or who are looked after
either at home or away from home. School nurses also provide support to Unaccompanied
Asylum-Seeking Children (UASC). During 2024 to 2025, a new school nursing app was
developed to provide evidence-based information to young people on health and wellbeing.
2.7 In November 2024, Health Visiting and Family Nurse Partnership services across Ayrshire
were successfully reaccredited at Gold level for the UNICEF Baby Friendly award. The UK-
wide UNICEF Baby Friendly Initiative enables public services to better support families with
infant feeding and developing close and loving relationships so that all babies get the best
possible start in life.
328

Page 329

87 
This prestigious award has a particular focus on sustainability, providing a framework to
ensure that infant feeding care is evidence-based, consistent, and supports staff to deliver a
service that provides the best possible care for new families, with a formal revalidation process
taking place two years after initial Gold accreditation and every three years thereafter.
This is a significant achievement for health visitors, family nurses and support staff across
Ayrshire.  
329

Page 330

88 
Inspection of service 
The Partnership works closely with independent care providers to ensure
that the care and support provided is being delivered in line with peoples’
outcomes, offers best value, meets regulatory requirements, and keeps
people healthy and well. 
Care services provided by Partnership teams also undergo external
inspections and are subject to rigorous review and inspection. Working
together, we ensure that all required standards of quality and safety are
met. 
330

Page 331

89 
Independent Care Providers who provide care services on our behalf 
Where we commission care and support from independent and 3rd sector Providers services based within the North Ayrshire
area, we monitor these services via the Contract Management Framework. The Framework focusses on ensuring a joint
approach to evaluating the quality of care and where appropriate provides an approach to supporting Providers to progress
improvements. We use a range of methods to monitor performance, including:
• Formal Contract Management meetings on a 6 monthly basis and an Annual Joint Evaluation of Contract to ensure that
services are safe, effective and most of all, that they meet people’s needs.
• Review of compliments, complaints and feedback from staff, carers and people who use services. 
• Information that we collect, before visits, from the provider or from our records. 
• Local and national information, for example, Care Inspectorate reports 
• Visits to providers, including observing care and support and looking at records and documents. 
The information below represents how those services which are registered with Care Inspectorate and are based in North
Ayrshire are currently performing.
Registered Services – Minimum Grades across all themes
Care Service Subtype 2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Adult Placement Service Not applicable 0 1 0 0 0 1
Care Home Service Older People 0 7 3 1 0 11
Care Home Service Children & Young
People 0 2 0 1 0 3
Care Home Service Learning Disabilities 0 1 2 0 0 3
331

Page 332

90 
Care Service Subtype 2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Care Home Service Mental Health
Problems 0 0 1 0 0 1
Child Minding Not applicable 0 4 5 0 0 9
Day Care of Children Not applicable 0 6 7 2 0 15
Housing Support Service Not applicable 0 0 3 3 0 6
School Care
Accommodation Service Not applicable 1 0 0 2 1 4
Support Service Care at Home 1 1 4 2 0 8
Support Service Other than Care at
home 0 0 1 0 0 1
Grand Total Not applicable 2 22 26 11 1 62 
332

Page 333

91 
Inspection of Local Services 
Throughout 2024 to 2025, a total of ten inspections took place by the Care Inspectorate, eight
were unannounced. 
• Health & Community Care - 2 inspections
• Children & Families & Justice Services - 6 inspections
• Adult Services - 2 inspections 
The Care Inspectorate use a six-point scale to grade inspections:
1 Unsatisfactory Major weaknesses – urgent remedial action required
2 Weak Important weaknesses – priority action required
3 Adequate Strengths just outweigh weaknesses
4 Good Important strengths, with some areas for improvement
5 Very Good Major strengths
6 Excellent Outstanding or sector leading 
Gradings for inspections can be found below. Inspection reports can be found on the Care
Inspectorate website - Inspection Reports.
333

Page 334

92 
Inspection Date Service/Unit Wellbeing Leadership Staffing Environment Care &
Support
04 - June – 24 The Meadows 3 0 0 0 0
20 - June – 24 Montrose House 3 3 3 4 3
12- August - 24 Canmore 3 0 0 0 0
22 - October - 24 Trindlemoss Day
Opportunities 5 5 5 5 4
31 - October – 24 Montrose House 4 4 0 0 0
05 - November – 24 Supported Carers
Scheme 5 3 3 0 3
16 - January - 25 Trindlemoss
House 4 4 4 3 5
03 - March - 25 Adoption 5 3 0 0 4
26 - March - 25 Achnamara 3 0 0 0 0
28 - March - 25 Fostering 4 3 0 0 4 
334

Page 335

93 
Financial performance and best value 
Financial information is part of our performance management framework
with regular reporting of financial performance to the IJB. 
This section summarises the main elements of our financial performance for
2024 to 2025.
335

Page 336

94 
Partnership Revenue Expenditure 2024 to 2025
Strong financial planning and management is paramount to ensure our limited resources are targeted
to maximise the contribution to our objectives. Delivery of services in the same way is not financially
sustainable. The updated strategic plan approved for 2022 to 2030 is underpinned by the need to
learn from the pandemic and ensure opportunities are maximised to transform care models and find
new solutions to ensure the future sustainability of high-quality heath and care services. 
The IJB set a balanced budget for 2024 to 2025 on 14th March 2024. This did not require any draw
on reserves but did include the approval of £10.290 million of savings to achieve financial balance.
The ability to plan based on the totality of resources across the health and care system to meet the
needs of local people is one of the hallmarks of integrated care. Medium term financial planning is
key to supporting this process and identifying the transformation and planned shift in resources to
provide sustainable services to the local community over the medium term. 
Financial information is part of the performance management framework with regular reporting of
financial performance to the IJB. This included an integrated approach to financial monitoring,
reporting on progress with savings delivery, financial risks and any variations and changes to the
delegated budget. There were significant financial challenges during the period. The main challenges
during the year were residential placements for children, care at home, supplementary staff in wards
and Unplanned Activities (UnPACs) within the lead partnership for mental health.
From the initial budget monitoring report in month 3 the projected position has been an overspend.
The Integration Scheme requires the preparation of a recovery plan if an overspend position is being
projected to plan to bring overall service delivery back into line with the available resource. 
Following the finalisation of the 2023 to 2024 outturn position, the IJB agreed some initial recovery
actions for 2024 to 2025 and implemented management actions to reduce the 2024 to 2025 spend.
This included:
• Review of expenditure authorisation levels across the Partnership and escalation of specific
decisions to senior officers. In particular, a new governance group has been introduced,
involving the Director and Heads of Service, to oversee the agreement of higher value
packages of care (above £40,000 per annum)
• Staff communication in relation to discretionary/non-essential spend
• Review of temporary posts and robust vacancy management/approval. The vacancy scrutiny
group now has representation from all of the Heads of Service and a recruitment freeze will be
implemented for all but essential frontline posts
• Ongoing review of future year savings or transformation programmes to identify scope for
acceleration
• Maximise opportunities from the recently reopened Independent Living Fund (ILF) Scotland
In order to facilitate greater scrutiny of the financial position and the delivery of the financial recovery
plan during 2024 to 2025, the IJB agreed at the June meeting to establish a ‘Finance Working
Group’, chaired by the IJB Vice Chair. The Director and Heads of Service are members of the group.
This Finance Working Group meets monthly to facilitate increased oversight and scrutiny of the
336

Page 337

95 
financial position and transformation programme as well as detailed budget planning for future
financial years.
Since the initial recovery plan was agreed in June 2024 there was a £4.002 million reduction in costs.
The outturn is an overall year-end overspend of £1.212 million on an IJB basis, which when adjusted
for new earmarked reserves of £2.381 million is increased to £3.593 million (1.1%), which is a
favourable movement of £1.387 million from month 10. 
2023-24
Budget
£000
2023-24
Actual
£000
Variance
(Fav) /
Adv
£000
Service 2024-25
Budget
£000
2024-25
Actual
£000
Variance
(Fav) /
Adv
£000
91,174 95,625 4,451 Health and Community
Care 92,549 98,181 5,632
100,990 98,639 (2,351) Mental Health 108,721 107,823 (898)
40,135 43,431 3,296 Children, Families and
Justice 43,717 44,294 577
52,865 52,863 (2) Primary Care 53,575 53,662 87
10,098 10,098 0 Allied Health
Professionals 10,748 10,749 1
12,740 11,287 (1,453) Management and
Support Costs 13,970 10,186 (3,784)   
Change Programme 1,635 1,725 90
1,852 1,317 (535) Chief Social Work Officer 1,710 1,773 63
1,671 1,630 (41) Financial Inclusion 4 4 0
3 3 0 National Commissioned
Service 92,549 98,181 5,632
311,528 314,893 3,365 TOTAL EXPENDITURE 326,629 328,397 1,768
(311,528) (311,528) 0 TOTAL INCOME (326,629) (326,629) 0
0 3,365 3,365 OUTTURN ON A
MANAGED BASIS - 1,768 1,768
0 1,117 1,117 Lead Partnership
Allocations 0 (556) (556)
0 4,482 4,482 OUTTURN ON AN IJB
BASIS - 1,212 1,212
0 2,982 2,982 New Earmarking 0 2,381 2,381
0 (2,000) (2,000) Draw on Reserves 0 0 0
0 5,464 5,464
OUTTURN POSITION
PRIOR TO ADDITIONAL
FUNDING
CONTRIBUTIONS
0 3,593 3,593
0 0 0 Additional funding
contributions 3,593 0 (3,593)
0 5,464 5,464 FINAL OUTTURN
POSITION 3,593 3,593 - 
The Integration Scheme describes the required approach where there is a projected overspend on
the IJB integrated budget, which includes the requirement to agree a recovery plan to balance the
overspending budget. Only if the recovery plan is unsuccessful will the Health Board and Council
337

Page 338

96 
consider making available interim funds. The Chief Officer wrote formally to North Ayrshire Council
and NHS Ayrshire and Arran to request additional in-year funding and at month 12 the following has
been agreed:
Social Care element – overspend of £2.036 million. North Ayrshire Council considered this at the
Council meeting of 3rd June and agreed to fund this with no requirement to repay the funds in future
years.
Health element – overspend of £1.557 million. NHS Ayrshire and Arran have funded this but clarity
is needed on whether this will be repayable in future years or not .
Following these additional funding contributions the final position is on-line.
The main areas of variance during 2024 to 2025 are noted below:
Health and Community Care – overspend of £5.632 million mainly relates to overspends in care
at home, agency costs within integrated Island Services, supplementary staffing in wards and district
nursing staffing costs and care packages for people with a physical disability.
Mental Health – underspend of £0.898 million which relates to underspends in learning disability
care packages, community mental health, non-employee costs at Trindlemoss and these are offset
by the overspend on the Lead Partnership for mental health (UnPACs, elderly inpatients, psychiatry
and mental health pharmacy). There were also underspends in the Lead Partnership to the level of
vacant posts and these were taken as payroll turnover. There is also an underspend in the Alcohol
and Drugs Partnership which will be earmarked for use in 2025 to 2026. 
Children, Families and Justice – overspend of £0.577 million which is mainly related to
overspends in services for care experienced children (residential care, respite care and employee
costs) and services for children with a disability (residential care, respite care). These were partially
offset by an underspend in payments for looked after and accommodated children (fostering,
adoption and kinship) and the Whole Family Wellbeing Fund which will earmarked for use in 2025 to
2026. 
Management and Support Costs – underspend of £3.721 million mainly relates to underspends
in transition funding, an over-recovery of payroll turnover due to the level of vacant posts being higher
than assumed when setting the budget and the draw down of funding from reserves following a
review of reserves. 
Medium Term Financial Outlook
A Medium-Term Financial Outlook (MTFO) is a critical part of the strategic planning process. The
financial context for public services remains very challenging and so it is vital that the IJB’s strategic
ambitions are set against the financial resources which are anticipated to be available.
The MTFO provides key information on the possible financial position of the IJB over future years. It
identifies the financial challenges which will be faced by the IJB enabling the IJB to see the impact of
current and future decisions on its medium-term financial health.
The MTFO will also be used to identify pressure points and inform decisions which are required to
ensure the Partnership remains financially sustainable.
338

Page 339

97 
There are a range of factors which influence the financial planning of the IJB. These are considered
through the MTFO and include the following:
• Demographic changes
• Local priorities
• Workforce challenges
• The UK and Scottish Economy
• Policy and Legislation
• Cost and demand pressures
• Available funding
As in previous years, a Medium-Term Financial Outlook has been prepared to identify what the
financial position may look like moving into 2026 to 2027 and 2027 to 2028.
This has not been published in full at the present time as the Scottish Government indicated in the
Scottish Budget that its Medium-Term Financial Strategy will be updated and published in May 2025.
Following this, a full update report will be brought to a future IJB covering the period 2026 to 2027 to
2028 to 2029.
Reporting on Localities
The Partnership has arrangements to consult and involve localities via their Locality Forums. The IJB
has established six Locality Planning Forums, reflecting the previously agreed local planning areas.
These provide Board Members with the opportunity to be involved in considering the priorities for
each area and outline the role for each Community Planning Partner in meeting these priorities in
conjunction with the local communities. This spend has been split into localities by initially allocating
spend which could be directly identified to a locality, and the remainder which was not locality specific
was allocated on a population basis. 68.1% (65.4% in 2023 to 24) of spend was allocated based on
population, which means at this stage the spend per locality can only be used as a guide and will not
fully reflect actual locality usage of services. The population information used can be seen in the
following table and was taken from the 2023 mid-year population statistics (sourced from National
Records of Scotland).  
339

Page 340

98 
Allocation Method %
Total allocated on population basis 68.1%
By Locality 31.9%
Total 100% 
This resulted in the following spend per locality - 
Expenditure  Irvine
£000’s
Kilwinning
£000’s
Three
Towns
£000’s
Garnock
Valley
£000’s
North
Coast
£000’s
Arran
£000’s
Total
£000’s
2024-25
Expenditure 100,373 35,085 74,876 46,902 56,041 15,120 328,397
% share of
spend 30.6% 10.7% 22.8% 14.3% 17.1% 4.6% 100%
% of total
population 29.2% 11.8% 23.5% 14.8% 17.3% 3.5% 100% 
Age Group Irvine Kilwinning Three
Towns
Garnock
Valley
North
Coast Arran Total
% of
spend
allocated
Children
aged 0 to
15 
31.4% 13.0% 24.5% 14.5% 13.9% 2.6% 100% 11.8%
Adults
aged 16 to
64
30.0% 12.1% 24.1% 15.3% 15.5% 3.1% 100% 26.6%
Older
People
aged 65+
25.6% 10.1% 21.4% 13.6% 24.3% 5.0% 100% 18.4%
Share of
total
population
29.2% 11.8% 23.5% 14.8% 17.3% 3.5% 100% 8.6%
340

Page 341

99 
Appendix  
341

Page 342

100 
Local Indicators – 2024 to 2025
These local indicators are those related to our strategic plan outcomes for 2022 to 2030 
Performance Indicator 2024/25 Target Status
Number of service users referred to employability
service 121 36 
Employability mentors - No of service users being
supported into employment, training, education. 45 28 
Number of PRI sessions which have taken place 8 8 
Support 4 formerly cared for young people to move
into independent living each year. 15 4 
Support 45 children and young people into kinship
care placements each year. 39 45 
Recruit 6 new foster carers each year. 2 6 
People attending the emergency department will be
seen within 4 hours from arrival at hospital (Arran) 98.8% 95% 
Increase the number of Naloxone Kits distributed per
annum (387 per year – 97 p/q) 741 387 
Deliver 4,275 ABIs each year (pan Ayrshire) 7,265 4,275 
CAMHS – Seen within 18 weeks (RTT) 99.6% 90% 
Psychological Therapies – Seen within 18 weeks
(RTT) 89.8% 90% 
Reduce out of hours admissions for people aged 65
and over (MH) 20 32 
No under 18 should be admitted onto the Adult
Intensive Psychiatric Care Unit (Ward 8) 0 0 
All accepted referrals to the Intensive CPN team
from non-mental health referrers will receive contact
within 4 hours
94.4% 90% 
People subject to level 1 Community Payback Order
(CPO) Unpaid Work completed within three months 98.7% 57% 
Individuals subject to level 2 Community Payback
Order (CPO) Unpaid Work completed within six
months
96.4% 67% 
342

Page 343

101 
MSG Indicators
Performance Indicator 2021-22 2022-23 2023-24 2024-25 Target Status
Emergency admissions to acute hospitals 1,376 1,560 1,643 1,495 1,836 
Emergency admissions to acute hospitals (rate per 1000) 10.28 11.69 12.30 11.19 13.6 
Admissions from emergency department 769 699 820 732 1,173 
Admissions from emergency department (rate per 1000) 5.74 5.24 6.14 5.48 8.7 
% people at emergency department who go onto ward stay
(conversion rate) 27.10% 26.70% 27.60% 24.50% 33 
Unscheduled ‘hospital bed days’ in acute hospital 11,426 11,686 13,195 7,816 12,320 
Unscheduled ‘hospital bed days’ in acute hospital (rate per
1000) 85.36 87.54 98.79 58.52 91 
Unscheduled ‘hospital bed days’ in long stay mental health
hospital 2,658 2,117 2,191 2,167 6,782 
Unscheduled ‘hospital bed days’ in long stay mental health
hospital (rate per 1000) 19.86 15.86 16.40 16.22 50.1 
Unscheduled ‘hospital bed days’ in geriatric long stay 616 715 702 223 1,772 
Unscheduled ‘hospital bed days’ in geriatric long stay (rate per
1000) 5.63 6.55 6.42 2.04 13 
Emergency department attendances 2,840 2,620 2,972 2,988 3,292 
Emergency department attendances (rate per 1000) 21.22 19.63 22.25 22.37 24.4 
% people seen within 4 hrs at emergency department 67.60% 65.50% 59.80% 64.19% 95% 
Delayed Discharges bed days (all reasons) 1,776 1,852 1,785 2,876 1,515 
Delayed Discharges bed days (all reasons) (rate per 1000) 16.22 16.96 16.32 26.29 13.9 
Delayed Discharges bed days (code 9) 764 893 548 864 770 
Delayed Discharges bed days (Code 9) (rate per 1000) 6.98 8.18 5.01 7.90 7 
343

Page 344

102 
Where to find more information
If you would like more information on IJB strategies, plans and policies and
our performance and spending, please refer to the following websites.
• North Ayrshire Health and Social Care Partnership
• NHS Ayrshire & Arran - How we perform
• North Ayrshire Council - Strategies, plans, and policies
• North Ayrshire Council - Performance and spending
Additional financial information for Ayrshire wide services can be found in:
• East Ayrshire HSCP – Strategic Plan 2021-31
• South Ayrshire HSCP – Strategic Plan 2021-31 
344

Page 345

1 
North Ayrshire Health and Social Care Partnership 
Annual Performance Report 
Summary Report 2024 to 2025 
345

Page 346

2 
Contents
Annual Performance Report Summary Report 2024 to 2025 ............................................................... 1
Annual Performance Report 2024 to 2025 – Overview ..................................................................... 3
Tackle Inequalities ............................................................................................................................ 4
Enable Communities ......................................................................................................................... 4
Provide Early and Effective Support ................................................................................................. 5
Developing and Supporting Our Workforce....................................................................................... 6
Improve Mental and Physical Health and Wellbeing ......................................................................... 7
Children’s Outcomes ......................................................................................................................... 8
Justice Outcomes ............................................................................................................................. 9
Transformation ................................................................................................................................ 11
Lead Partnership Responsibility – Mental Health ............................................................................ 12
Lead Partnership Responsibility – Child Health Services ............................................................... 13
More Information ............................................................................................................................. 15 
346

Page 347

3 
Annual Performance Report 2024 to 2025 – Overview
This summary of our annual performance report showcases some of the highlights of the excellent
work carried out by our services within the North Ayrshire Health and Social Partnership. This report
aligns with our “Caring Together” Strategic Commissioning Plan 2022 to 2030. The plan set out our
pandemic recovery intentions, as well as offering a longer-term vision for local health and social care
services. 
Below are the five Strategic Objectives of the North Ayrshire Health and Social Care Partnership.
Over the period of the Strategic Commissioning Plan, the Health and Social Care Partnership will
seek to: 
We see these priorities as interlinked, and we expect that where we see success against one priority,
it’s effect will positively impact against others.
People who use our services and North Ayrshire residents will experience our Partnership values in
the way our staff and volunteers engage with you and how we behave. We will treat you with: 
Whilst this document provides a brief overview of performance, the full Annual Performance Report
for 2024 to 2025 is also available to view. 
347

Page 348

4 
Tackle Inequalities
• North Ayrshire Council has been awarded by charity ‘The Smallest Things’ with the nationally
recognised ‘Employer with a Heart’ charter mark. The change in the Council’s Maternity Scheme
has been made to support employees affected by premature birth.
Parents – employed by North Ayrshire Council – of babies born at or before 37 weeks will be
entitled to receive an extra week’s Premature Baby Leave and Premature Baby Pay for every
week until their babies original due date. The leave entitlement will be added to the end of the
employee’s agreed Maternity leave period after the Maternity Leave entitlement has elapsed.
Once the employee has ended their maternity leave, they will then move to the premature baby
leave/pay. This leave will be paid at full pay.
Fiona Walker, Head of Service for People and ICT, shares: “I am delighted that the Council has
received the ‘Employer with a Heart’ Charter status. “It is vital as one of North Ayrshire’s largest
employers that we help employees and local families who may be dealing with the premature birth
of their baby.
• Our Money Matters Team once again supported the most vulnerable people in our communities,
accessing entitled benefits to the incredible sum of £21,530,176.11, an increase of almost £1
million pounds from 2023 to 2024. This was achieved against a backdrop of ongoing welfare
reform and a complex benefits system. 
Enable Communities
• In a groundbreaking achievement, NHS laboratory specimens were successfully delivered from
the island of Arran by drone across the Firth of Clyde. This innovation, part of Project CAELUS,
reduced delivery times from several hours to just 30 minutes, significantly speeding up diagnostic
processes and treatment decisions. This project demonstrates the commitment to leveraging
technology to enhance healthcare delivery, particularly benefiting remote and rural communities.
The successful trial marks a significant step forward in addressing logistical challenges faced by
remote communities.
• Support for people with dementia in North Ayrshire received a boost after Anam Cara respite
centre in Kilbirnie was officially reopened with a ribbon-cutting ceremony on Tuesday 4 June
following an extensive refurbishment project. 
348

Page 349

5 
The specialist dementia respite centre accommodates up to 9 guests aged 60 years or over,
offering critical respite services within single room, en-suite accommodation. The support service,
which is run by North Ayrshire Health and Social Care Partnership, had been temporarily
relocated to the vacant Taigh Mor site in Beith to allow the service to continue while works were
carried out.
The refurbishment project included a
complete transformation of the main
garden area, including new garden
furniture, with a ramp installed from the
conservatory to allow better access for
guests to enjoy the outdoors. An
additional, smaller garden area adjacent
to the dining area has also had some
landscaping improvements made. 
A full revamp of the internal areas of the
building has also been carried out, with
works including wet wall installation in
several of the bathrooms, replacement
light fittings with energy-efficient LED bulbs and a full upgrade to the reception area. An archway
has been created within the dining area to improve the space, allow better access to the outdoors
and create an improved flow for staff moving around the area, and a new boiler and generator
have been installed. 
Provide Early and Effective Support
• We are delighted to announce that North Ayrshire Health and Social Care Partnership (HSCP)
was awarded the Bronze Digital Telecare Implementation Award in recognition of the progress
made on our analogue to digital telecare transition project.
To achieve Bronze status, a Telecare Service Provider must have successfully deployed digital-
ready alarm devices to at least 50% of all dispersed and group alarm users. This is the first major
milestone in the transition to digital telecare and sets the foundations upon which the rest of the
digital telecare transition will rest.
North Ayrshire HSCP has been preparing for the analogue to digital switchover for a few years
now. In 2022, a project board was set up and the project team recruited in early 2023. There have
been many challenges along the way including equipment shortages, procurement obstacles and
a tender for a call receiving partner to overcome. It is hoped that the remainder of the equipment
rollout will be straightforward, with a new aim to achieve Silver status. The team are on course to
have the project completed during 2025.
Kevin Queenan, TEC Lead, said: “We’re delighted to have achieved our Bronze Award. Our
technicians are very knowledgeable and a pleasure to work with, and our fantastic management
and project board have supported us throughout – keeping us on the right path as digital is new to
all of us”.
Alan Boyle, Digital Technician, said: “We’re enjoying the role, it’s great to learn new technologies
and rewarding to know that we’re keeping our service users safe”.
349

Page 350

6 
Achieving this Award is a significant achievement and once the rollout of equipment is completed,
North Ayrshire HSCP will move towards the first phase of testing with alarms and peripherals.
• The North Ayrshire Primary Care Development Manager worked successfully with 11 North
Ayrshire GP practises, selected by the Scottish Government Improvement Service and HSCP
Money Matters team, to implement the ‘Providing Welfare Rights in GP Practices’. The initiative
saw Income Advisors based in these practices, who worked with patients and residents to carry
out complete benefits checks, help them make claims and support them if they were disputing
claims. Year 3 of the pilot resulted in: 
• 536 referrals to the service (compared to 646 in the second year, 17%
decrease).
• £3,126,685.18 has been generated for patients and residents of North
Ayrshire in the Third year of the Project with a total £6,979,573.24 since project
commenced in 2022 to 2023.
Developing and Supporting Our Workforce
• The LiveWell group have partnered with KA leisure to bring free health checks to Council
employees. The KA Leisure health check sessions include lifestyle and weight management
advice along with cholesterol, blood pressure, blood sugar testing and the Boditrax machine – a
clever system that assesses your body and, very quickly, delivers 14 different measurements,
such as your ideal weight, your BMI and your metabolic age.
Our Chief Executive Craig Hatton booked in to one of
the health check sessions and encouraged others to
do the same. He said: “It’s been brilliant having the
opportunity to have my recent employee health check,
thanks to the LiveWell group and our partners at KA
Leisure.
I think it’s important that colleagues understand just
how vital it is to take time for their own health and
learn about what they can do proactively to improve it.
The reason I booked in to a recent KA Leisure health
check was because I am mindful that I’m not getting
any younger and I knew – for my own peace of mind – that making time to have the check done
was going to be beneficial for me.”
• As platinum award winners in Investors in People, the Dirrans team were looking for a
different challenge so went forward for a new award from Investors in people ‘We invest in
wellbeing.’ The We invest in wellbeing framework looks for a strategy and approach to the health
and wellbeing of staff. This should be measurable and understand the impact of this on staff
practice. The team considered and improved practice by evaluating staff wellbeing through
surveys and feedback. They created a wellbeing policy and strategy to guide wellbeing goals such
as reducing sickness absence, improving job satisfaction and job retention. They also developed
subgroups that focussed on physical, psychological, social and financial factors that can affect
staff and shared this as a team to be more informed about what supports staff can access to help
improve wellbeing. 
350

Page 351

7 
The team reflected that they already felt that they had a strong presence for looking after staff
however going through this process it highlighted areas for improvement and how the framework
could improve the service. The We invest in Wellbeing framework comprises three indicators,
each with three themes. This defines what it takes to reach each level of accreditation standard,
silver, gold, and platinum.
It was intended to start at the first level of
‘standard’ however when receiving feedback, this
had jumped to silver which is an amazing
achievement, and the Dirrans Centre were
confirmed winners of the silver award in August
2024.
We invest in wellbeing silver award means that
you have an established wellbeing strategy or
plan and that your people feel positive about your
strategy, plans and activities. Developing and
supporting our workforce ensures employees are
more efficient and effective in their roles, helps
retain our skilled and qualified staffing resources,
and improves morale and job satisfaction.
Improve Mental and Physical Health and Wellbeing
• A report produced by NHS Ayrshire & Arran’s Prevention and Service Support Team has
highlighted the positive impact of Naloxone distribution and use in North Ayrshire.
This safe and easy-to-administer medication temporarily counteracts the effects of opioids, such
as heroin, methadone, codeine, morphine and buprenorphine, and can save lives by reversing an
overdose for 20 to 40 minutes until emergency help arrives.
1,640 Naloxone kits were handed out in Ayrshire between April 2024 and March 2025 (741 of
which were in North Ayrshire), with 73 lives reported to have been saved in that time (18 in North
Ayrshire). However, the true number of lives saved is thought to be higher, with many instances of
Naloxone use going unreported. 
In addition, a total of 1.225 people received overdose awareness training across Ayrshire in the
same time period, with a further 428 people attending a virtual or face to face Naloxone
awareness course.
• The Three Towns Community Shed offers a safe and welcoming space for anyone over the age
of eighteen to drop in, take part in a wide range of activities, learn some additional skills and enjoy
socialising with new friends. 
This fantastic community initiative was launched recently after bringing together the existing local
Men's Shed and recently formed, She Shed under one banner, with a base at 12C Castle Works,
Hill Street, Ardrossan. While the two groups learn, create and socialise in their own right, they
also enjoy combined experiences and social events.
351

Page 352

8 
Helping to combat social isolation, the Shed
offers local people a chance to go along and
take part in arts and crafts, woodworking, 3D
printing, model building, bicycle repairs, fixing
furniture or small personal items, and even a
music group. 
The Shed has recently been commissioned by
both a local care home and primary school to
build them memorial benches and has
previously built planters for other community
groups.
Children’s Outcomes
• February saw the launch of a brand-new mobile app called ‘CE4U’ (Care Experience for You),
the mobile app for iPhone and Android has been designed specifically for care experienced young
people. Launched as part of National Care Day, an annual awareness day to celebrate care and
compassion of children and young people with care experience, the app has been developed with
the help of pupils from local secondary schools over the past eighteen months.
Free to download, its aim is to provide a hub of useful information and helpful advice on everyday
topics including housing, travel, mental and physical health, recipes, job opportunities and
entitlements. 
Android Play Store Link      Apple App Store Link
Developed by young people for young people, the collaboration was made possible due to
fortnightly Champions Board meetings that take place in our secondary schools. These drop-ins
provide a safe space for care experienced pupils to get advice, plan peer events and access
scaffolding and support to help them succeed.
The launch is part of the Council’s wider Corporate Parenting Strategy to meet its statutory duties
to keep The Promise to Scotland’s care experienced community – in this case those living and
studying in North Ayrshire.
• A transformation programme to improve outcomes and opportunities for care experienced children
and young people in North Ayrshire is now under way, with progress being made since its launch
in April 2024.
352

Page 353

9 
The Brighter Pathways Programme Board was set up to look at how services can be delivered
differently to ensure care experienced children and young people have access to the appropriate
resources and supports into adulthood.
In line with its Promise commitments, North Ayrshire Health and Social Care Partnership
(NAHSCP) has a firm focus on providing the right support and intervention to allow children and
young people to remain with birth family or wider family wherever possible, preventing them from
coming into local authority care - for example, being placed in foster care or in residential
children’s houses. 
To build on this already established early intervention work, the Board is currently looking at the
supports available for families to identify if there are any gaps in service provision where
additional early help and more intensive support could help more children to remain with their
families.
An acute challenge in recruiting and retaining foster carers is having an impact nationally, which
has been further impacted by the current cost of living crisis and a reduction in the number of
potential foster carers having spare
bedrooms due to an increase in home
working and their own children staying at
home for longer.
Recruiting foster carers for NAHSCP is
further impacted by a number of
independent fostering agencies operating in
the area and taking on carers. In a bid to
boost recruitment, which is a priority for the
programme board, an investment in a long-
term digital marketing campaign has recently
been agreed, working with a provider that
has a proven track record in local authority
foster care recruitment.
Justice Outcomes
• Diversion from Prosecution (Diversion) has been available since 1997, within this past year we
have experienced a further increase across Ayrshire in assessment referrals from the Procurator
Fiscal. Referrals have increased at a significant rate from 2018. Although this disposal is early
intervention and low-level offending, the presenting need of service users is extremely high, thus
resulting in more staff time being allocated and closer partnership working with other agencies to
provide identified services. 
The number of assessment reports submitted are relatively lower than the number requested due
to limited resources, which has resulted in waiting lists within each local authority area. 
In comparison with last year, 2024 to 2025 notes a decrease in the number of Diversion cases
imposed. This is due to delays from the time that the offence was committed until the individual is
referred to and assessed by the Diversion team. In this time many positive changes could have
taken place and individuals are actively seeking and engaging with services to address any issues
which they may have, thus reducing their risk of further offending. In these instances, no
interventions are required due to positive reasons. 
353

Page 354

10 
• There was a marked increase in in Drug Treatment and Testing Order (DTTO) Assessment and
Impositions in 2023 to 2024. There has been a slight decrease in 2024 to 2025; however, the
volume of assessments and new Orders this year remains high. The last two years figures appear
to represent a return to ‘the norm’ following a ‘dip’ attributed to covid. 
Of the 63 assessments completed in 2024 to 2025, 45 new DTTO’s were imposed across
Ayrshire. This incorporates Orders from both Kilmarnock and Ayr Sheriff Courts. DTTO is an
intense Order which involves monthly Court reviews, twice weekly contact for the first month and
weekly oral drug screens. There are three distinct roles within the team delivering the service and
interventions. The Supervising Officer oversees the Order, monitors compliance and compiles the
assessment and review reports. The Additions Worker delivers the therapeutic interventions and
is primarily responsible for administering the oral drug screens. There are then Recovery
Development Workers who provide practical supports, assistance with welfare needs and also
build links and connections within the recovery community to help build the persons own recovery
capital.
A Recovery Care Plan is created with each individual. There are ten domains, including
substance use, relationships and offending, which are scored from 1 to 10. These plans are
updated at three monthly intervals and allows areas for support/intervention to be identified and
progress to be monitored. 
354

Page 355

11 
Transformation
• The North Ayrshire HSCP Transformation Plan 2024 to 2027 is an ambitious programme of
change consisting of a range of improvement and reform projects across all service areas, each
aiming to improve the quality of our services and contribute to the long-term sustainability of
health and care in North Ayrshire. The Transformation Plan was approved by IJB in March 2024.
• Our aspiration is that children who require alternative care are best placed in family-based care,
and we require a number of new foster carers to meet the current demand for children of all
ages. 
The biggest challenge facing the fostering sector today is the recruitment and retention of high-
quality foster carers who can meet the needs of children in care. A lack of available foster carers,
in the right place at the right time, means children are missing out on vital support. Children in
need of care are at risk of being moved away from their communities, hobbies, siblings, and are
having to change schools and leave behind what is important to them, which has a detrimental
impact on their wellbeing, stability and development. 
The Fostering Service has lost fifty-nine interim carers over the last two years, this is due to
resignations, de-registrations and change of role of carers.
The service has a target to recruit six new carers per year; however, this has not been achieved in
each of the last five years. Within the foster care workstream, recruitment of foster carers was
identified as a priority area that required immediate focus.
• NHS Ayrshire & Arran, in partnership with Coloplast Ltd, launched a successful pilot service to
improve the lives of people with multiple sclerosis (MS). This innovative service focuses on
managing neurogenic bladder and bowel dysfunction, a common issue for people living with MS.
Key achievements include the introduction of a dedicated bladder and bowel clinical nurse
specialist, early detection through patient questionnaires, and significant reductions in urine
retention and urinary tract infections. Patients have experienced improved health outcomes,
enabling them to engage more fully in work and social activities. This pilot sets a new standard for
MS care, demonstrating the benefits of early intervention and integrated care pathways.
• Child & Adolescent Mental Health (CAMHS) in Ayrshire & Arran are continuing to engage in
and influence West of Scotland CAMHS pathways and service developments such as Forensic
CAMHS. 
West Road in Irvine will be the new Specialist CAMHS Assessment & Treatment Centre for
Ayrshire as well as the operational base for the Community Eating Disorders Services by April
2025. Some administration staff are already based at the building and the rest of the staff will be
moving in once the staff attack alarms are completed and a few other issues are resolved. Open
seven days per week, specialist CAMHS Neuro, ADHD, play Therapy and other Clinical
Interventions will be delivered from this re-fitted facility. Hosting flexible working space for staff
with five clinic rooms and two large meeting rooms, it is envisaged that the facility will become a
centre of excellence in the care and treatment of child and adolescent mental ill-health and eating
disorders.
355

Page 356

12 
Lead Partnership Responsibility – Mental Health
• Trindlemoss Day Opportunities in Irvine has been praised in a report by the Care Inspectorate
after an unannounced inspection visit in October, with the majority of areas looked into being
rated as ‘very good’ by the national regulatory body.
The service, which opened in 2020, provides tailored support for over 100 people with learning
disabilities from its base in Tarryholme Drive in Irvine.
The inspector identified a number of significant strengths within the service, with customers found
to be ‘supported in stable groups by consistent staff who know them well’. The ‘warm, respectful
and kind interactions between staff and people supported’ were also highlighted in the report.
Support was found to be tailored to
each individual’s identified outcomes,
with the service maintaining a flexible
approach that allows customers to
access a range of groups and activities
of their choice. Regular project topics
also provide multiple opportunities for
themed activities and trips to associated
places. 
Health promotion and education is
integrated into activities, empowering
people to take control of their health and wellbeing, with the service also making use of local
facilities such as the swimming pool and gym. These trips also provide a chance to enhance
travel and life skills.
Trindlemoss Day Opportunities was also praised for its strong links to the local community,
providing support for lunch clubs, play groups and dementia support groups, as well as assisting
with gardening and litter picking.
Additionally, the Baristamoss Café is open to the local community several days a week, providing
employment training and boosting the development of social skills for those supported.
In terms of staffing, employees were described as enthusiastic and knowledgeable, putting
customers at the centre of all they do. Staff reported that they were able to spend quality time with
individuals and get to know them well, and support was found to be provided in a timely manner.
Good relationships were noted between staff and management, with appropriate checks and
audits in place for the service type.
The Trindlemoss facility was commended for being clean and well maintained, offering a
generous amount of space split into zones allowing multiple activities to take place at the same
time. The gardens were described as ‘well maintained’ and used for a number of activities -
including growing vegetables - and areas such as the training kitchen and laundry area provide
important socialisation and life skill development opportunities.
• NHS Ayrshire & Arran has officially opened a new, nurse-led Mental Health Unscheduled Care
Assessment Hub. Recognised as the first of its kind in Scotland, the hub aims to deliver a new
model of care.
356

Page 357

13 
The Mental Health Unscheduled Care Assessment Hub, based at Woodland View in Irvine,
provides a patient-focused, therapeutic space to support the delivery of compassionate care to
those individuals with acute mental illness who would be eligible to access an adult acute mental
health bed for ongoing intensive assessment.
Managed and coordinated by the Mental Health Unscheduled
Care Service, the hub provides 24-hour access to mental health
assessment and interventions. The service is delivered by
experienced Registered Mental Health Nurses within a
therapeutic environment for a period of up to 72 hours and will be
able to accommodate up to five patients. 
North Ayrshire Health & Social Care Director, Caroline Cameron
explained, “We are delighted to be able to officially open this new
service.
“We piloted the hub earlier this year for a small number of
patients. We are now ready to open at full capacity and provide
those living in Ayrshire and who are experiencing acute mental
illness with this new way of working.”
The hub aims to:
• improve the patient journey through the Mental Health Unscheduled Care Service.
• facilitate closer working and a smoother patient journey between community and inpatient
services.
• reduce the number of unscheduled admissions to acute adult inpatient mental health beds.
• reduce the waiting time for planned adult acute admissions.
• reduce the number of initial assessments carried out in acute wards releasing resource for
treatment.
• provide training opportunities in assessment of mental illness for clinical staff.
Lead Partnership Responsibility – Child Health Services
• Breastfeeding has been a longstanding priority for staff working in North Ayrshire. The integrated
community infant feeding team which includes midwives, health visitors, Family Nurses, support
staff, Community Infant Feeding Nurse, and Support Nurse, as well as colleagues from the
Breastfeeding Network (BfN) work closely with families to help them make an informed choice
about feeding. Staff have all received regular high-quality training to ensure they are
knowledgeable and skilled in relation to infant feeding.
Breastfeeding rates have shown the biggest improvement in 20 years in North
Ayrshire. The published data for 2023 to 2024 has shown the following
improvements in breastfeeding indicators from a North Ayrshire perspective.
357

Page 358

14 
Indicator 2022 to
2023
2023 to
2024
Variance
% breastfeeding at initiation 53.0 59.6 6.6%
increase
% exclusive breastfeeding at first HV
contact (10 to 14 days)
23.2 30.5 7.3%
increase
% exclusive breastfeeding at 6 to 8-
week HV assessment
20.3 25.6 5.3%
increase 
The benefits of breastfeeding on the short and long-term health of mothers and babies have been
well documented. It promotes optimum nutrition, growth and development for babies, as well as
providing comfort and protection from infections. As such, breastfeeding is actively promoted and
supported in a wide range of settings across North Ayrshire and Arran.
• Child healthy weight is a public health priority. Over the last three decades, obesity levels in
children and, indeed, the wider population have increased, with inequalities observed across our
communities. Maintaining a healthy weight throughout childhood is associated with many health
benefits both in the short-term and the medium term. 
Child healthy weight is monitored throughout the universal Health Visiting pathway but also when
a child moves into Primary 1. The most recent data for 2023 to 2024 was released in December
2024. For North Ayrshire:
• 74.8% of P1 children were of a healthy weight.
• 12.4% of P1 children were at risk of overweight. 
• 11.9% of P1 children were at risk of obesity. 
358

Page 359

15 
More Information
If you would like more information on Integration Joint Board (IJB) strategies, plans and policies and
our performance and spending, please refer to the following websites.
• North Ayrshire Health and Social Care Partnership
• NHS Ayrshire & Arran - How we perform
Additional financial information for Ayrshire wide services can be found in:
• East Ayrshire HSCP – Strategic Plan 2024 to 2027
• South Ayrshire HSCP – Strategic Plan 2021 2031
359

Page 360

360

Page 361

NHS AYRSHIRE AND
ARRAN
DELIVERY PLAN
2025-2026  
Agenda Item 10
361

Page 362

Contents
Chief Executive Summary ............................................................................................................... 3
1. Introduction ................................................................................................................................. 3
2. Population Health and Reducing Health Inequalities ....................................................... 4
3. Quality and Safety .................................................................................................................... 10
4. Value Based Health and Care ............................................................................................... 11
5. Women and Children’s Health .............................................................................................. 13
6. Planned Care ............................................................................................................................. 17
6.1  Cancer ................................................................................................................................. 22
6.2 Musculoskeletal Health .................................................................................................. 22
7. Unscheduled Care ................................................................................................................... 24
7.1 Delayed Discharges ......................................................................................................... 29
8. Urgent Care ................................................................................................................................ 30
9. Primary and Community Care .............................................................................................. 31
10. Mental Health ......................................................................................................................... 34
10.1 CAMHS ................................................................................................................................ 35
10.2 Psychological Therapies ................................................................................................ 37
10.3 Community Mental Health Services ............................................................................ 38
10.4 Unscheduled Care ........................................................................................................... 39
10.5 In Patient............................................................................................................................. 40
10.6 Alcohol and Drug Service .............................................................................................. 41
10.7 Learning Disabilities ....................................................................................................... 43
11. Healthcare in Custody ........................................................................................................ 45
12. Pharmacy ............................................................................................................................... 46
13. Infrastructure ......................................................................................................................... 48
14. Community Wealth Building / Anchor ............................................................................ 49
15. Workforce ............................................................................................................................... 51
16. Digital ...................................................................................................................................... 54
17. Climate .................................................................................................................................... 56
18. Finance ................................................................................................................................... 58 
362

Page 363

Chief Executive Summary 
NHS Ayrshire and Arran faces financial challenges in 2025/26 and beyond with a
requirement to create and deliver a sustainable health and care service within the envelope
of funding available. 
The financial context for NHS Ayrshire and Arran is challenging with a forecast budgetary
gap of £33.1M for 2025/26.  The Board will continue to develop a wide range of cash
releasing savings through service improvement and collaborations with our Health and
Social Care and System partnerships.  It is acknowledged by the Board that the route to
achieving financial balance will require service reform that will be delivered over the next 2
– 5 years. 
Our health and social care partners are also experiencing financial challenges, and it is
acknowledged that these financial pressures could impact some of the improvements that
are forecast within our acute service improvement plans. However, as a system we are
committed to working together to mitigate and manage these system pressures as they
emerge. 
The Board continues to have strategic workforce risks in relation to medical, nursing and
AHP supply and capacity. This is particularly challenging with regards to the medical
workforce and is maintained on the Strategic Risk Register as a very high risk, despite
treatment.  These risks will require national support and change as they are not unique to
our Board but are linked to national supply chains for controlled staff groups and as such
constrains our local ability to get traction on some of the prescribed planning priorities for
the Delivery Plan. 
Unscheduled Care and Planned Care demands continue and the Health Board remains
committed to achieving high standards of efficiency and productivity while ensuring robust
performance management and governance structures are in place to monitor safe delivery. 
The core aim to our service improvement programme being to enhance care pathways,
reduce duplication, and eliminate waste without compromising the quality and safety of our
patients and staff. 
1. Introduction   
The Delivery Plan (DP) has been prepared collaboratively with our partners, to provide
Scottish Government with confirmation that we have plans in place to demonstrate how our
health and care system will continue to stabilise and improve from the incredible pressure
which continues to be experienced. 
The Delivery Plan sets out our strategic context and priorities, and those of our partners in
the health and social care sector, which are aligned to the national priorities of the Scottish
Government and NHS Scotland as a whole.  
363

Page 364

We have worked alongside service leads across the health and care system within Ayrshire
and Arran to develop the Delivery Plan which focuses on system redesign and improvement,
to strengthen our services to meet increasing and more complex demand within a backdrop
of significant financial pressures. 
The Delivery Plan continues to be underpinned by our Caring for Ayrshire Vision, which is
driven by the need to rebalance health and care so that it is less acute focussed and there
is a stronger emphasis on delivering care in a variety of alternative and more locally based
settings. Caring for Ayrshire is a longer term vision which will take a number of years to fully
deliver and will require significant service change aligned to investment in infrastructure.  
The Delivery Plan is informed by appropriate quality, financial and workforce planning, as
well as setting the context for more detailed planning for the delivery of specific services and
the effective running of the organisation, such as digital, governance, and other corporate
functions.
Recognising the significant level of reform and redesign required we will maintain robust
stakeholder engagement to foster a bottom-up development and delivery process that
leverages the expertise of staff, patients, partners and communities, in line with the Planning
with People Framework.
Detailed actions for the recovery and stabilisation of our services are included in Delivery
Plan.  The delivery plan will be monitored regularly by the Improvement Programme Steering
Group, with each priority championed by the Recovery Director and managed through the
Operational Delivery Unit (ODU). 
2. Population Health and Reducing Health Inequalities 
In June 2024, the Cabinet Secretary for Health and Social Care outlined our vision: A
Scotland where people live longer, healthier and more fulfilling lives.  The vision is supported
by four key areas of work:  improving population health, a focus on prevention and early
intervention, providing quality services and maximising access.  Building on the positive and
innovative actions already taking place across areas including tobacco and alcohol control
to improve population health and reduce health inequalities, a long term Population Health
Framework is being developed, which the work we are prioritising will align to. 
Ayrshire, with an estimated population of 368,549, presents a diverse demographic
landscape. The majority of its residents, about 70%, live in urban areas, totaling 257,984
people. The remaining 30%, or 119,565 individuals, reside in rural settings. 
The age distribution reveals a varied population structure. Young residents aged 0-14
constitute 15.5% (56,992), while those in the 15-29 age bracket make up 16.1% (59,171).
The 30-44 age group also represents 16.1% (59,392), indicating a stable young adult
population. The largest age group is 45-59, comprising 22% (81,049) of the population,
followed by those aged 60-74 at 20.1% (74,105). Seniors aged 75 and above form 10.3%
(37,840) of the population, highlighting a significant elderly demographic.
364

Page 365

Health inequalities in Ayrshire and Arran are influenced by various socio-economic factors.
Here are some key areas of concern: 
Life Expectancy and Mortality: Life expectancy in Ayrshire and Arran is generally lower
than the Scottish average, with notable disparities between different areas. For example,
North Ayrshire has some of the lowest life expectancy, whereas South Ayrshire is closer to
or above the Scottish average. 
Chronic Diseases: The region has higher rates of chronic diseases such as chronic heart
disease (CHD), chronic obstructive pulmonary disease (COPD), and asthma. These
conditions are closely linked to socio-economic deprivation. 
Mental Health: Mental health issues are prevalent, with higher rates of hospital admissions
for mental health conditions compared to the national average. This includes conditions such
as depression, anxiety and self-harm. 
Emergency Hospital Admissions: Ayrshire and Arran have higher rates of emergency
admissions, which can be indicative of underlying health inequalities and access to primary
care services. 
Health Behaviors: Behaviors that impact health, such as smoking, alcohol consumption,
drug use and poor diet, are more common in deprived areas. These behaviors contribute to
the higher prevalence of chronic diseases and lower life expectancy. 
Access to Services: There are disparities in access to healthcare services, with rural areas
facing more significant challenges in accessing timely and adequate care. 
Getting it Right for Everyone (GIRFE)
Getting it right for everyone (GIRFE) is a multi-agency approach to health, social work, and
social care support and services from young adulthood to end of life care. As a practice
model it intends to shape the culture, design and delivery of health and social care services,
providing a more personalised way to access help and support when it is needed. The
ambition of GIRFE is to place the person at the centre of all the decision making that affects
them, with a joined-up consistent approach regardless of the support needed at any stage
of life. GIRFE has been co-designed by the Scottish Government, Health and Social Care
Partnerships, and the people of Scotland. 
A national toolkit has been developed with a focus on a ‘Team Around the Person’ approach,
which was developed collaboratively with people with lived experience and those with
professional experience. The ‘Team Around the Person’ toolkit provides a starting point and
a framework which can support the implementation of a GIRFE approach. 
East Ayrshire and South Ayrshire Health and Social Partnerships have been pathfinders in
this process, along with other HSCP’s, to inform the national toolkit.  GIRFE has been and
continues to be an ongoing iterative process and we continue to be involved in monthly
national meetings focussed around embedding GIRFE and sharing learning with other
HSCP’s across Scotland.  Good progress has been made in testing GIRFE within our
delivery models over the last year and this work will continue to embed the GIRFE Team
Around the Person Toolkit to support a person-centred, consistent and individualised
365

Page 366

approach to health and social care support, based on multi-disciplinary and inter-agency
working, with ongoing learning and feedback within 2025-26. 
Child Poverty
Public Health are progressing a life course approach to mitigating and preventing poverty,
internally through a dedicated action plan for tackling child poverty for the organisation, and
externally through our work supporting development of Local Authority and Community
Planning Partners through the development of Local Child Poverty Action Reports. 
In the initial stages of the year ahead we will continue to work closely with our partners in
terms of developing actions and sharing the evidence base with regards to poverty. We will
look across our internal NHS activity with regards to how our actions can support our
partners plans and identify what expertise, evidence and knowledge we can provide to
support planning and reporting. 
As an organisation the NHS has little control over the drivers of child poverty, however,
through providing assistance to partners and through internal assurance processes we will
endeavour to influence local and partnership activity which can. 
Tobacco
Locally, our NHS Ayrshire and Arran Tobacco Action Plan for our smoking cessation service,
Quit Your Way, have identified two improvement actions to be included within this Delivery
Plan.  The first is to increase smoking cessation referrals from other services such as
secondary/acute and mental health.  The Quit Your Way team can support staff within these
services to raise the issue of smoking and referral pathways through the delivery of training
and awareness raising sessions.  Additionally, the team can support the development and
delivery of specific quality improvement projects which aim to increase the identification and
offer of support to those who smoke. 
The second is to skill Quit Your Way staff to support the wider determinants of smoking
behaviour by identifying wider supports required and by providing information, signpost or
referral in response.
These actions also contribute to the wider Public Health, and Healthcare Public Health,
agenda by supporting developing “Waiting Well” action, which aims to improve the health of
those on our acute services waiting lists and so contribute to more positive outcomes for
both patients and services. 
Cancer Screening
In 2023 National Services Scotland (NSS) published the Scottish Equity in Screening
Strategy 2023-2026 which provides direction on national and local actions to achieve equity
for those eligible for screening. This national plan documents five areas for action and this
applies to all six screening programmes. 
Within Ayrshire and Arran a local screening inequalities plan for 2023-2026 was developed
along the themes of:
- Communications, engagement and learning
- Access to screening
- Data collection and monitoring
366

Page 367

- Research and evaluation
- Overarching issues 
NHS Ayrshire and Arran have utilised a fund from Scottish Government to tackle screening
inequalities, developing projects which aim to improve the uptake of screening. This fund is
for the three cancer screening programmes only. 
This funding stream provides the Health Board opportunities to implement initiatives which
are out with core programme delivery. Over the last two years access to the funding has
changed and with increasing financial pressures across the whole system it is unclear what
funding will be available in 2025/26 and future years. Any reduction to this funding stream
will pose substantial challenges to develop and implement projects to tackle inequalities
within cancer screening programmes which are out with core programme delivery. 
If there are no additional monies provided through inequalities funding there may be
proposed actions that cannot be met due to workforce. This is due to the fact these projects
are in addition to core programme delivery and form pilots which aim to gather evidence to
support service improvement and change. These projects require staff to work additional
and unsocial hours. 
Vaccination
The delivery of the vaccination programme is based on building and retaining a trained and
skilled workforce, investing in the infrastructure to support the programme and an effective
and trusted partnership with all key stakeholders, both local and national.  
There are imminent introductions of further changes to the programme with the potential
inclusion of a vaccine for chickenpox as part of wider changes to the routine childhood
immunisation schedule which are expected to be delivered in 2025/26. 
There are currently no strategic risks associated with vaccination programmes in NHS
Ayrshire and Arran, however there are a number of operational risks including: 
• The dependence on substantive staff working additional/extra contracted hours,
supported by bank staff, to enable the successful delivery of winter vaccination
programmes (COVID-19 and flu);
• Funding allocation for vaccinations still to be confirmed for 2025/26; and
• Forthcoming changes to the routine childhood immunisation schedule and associated
requirement for additional clinic accommodation, workforce; with additional funding as yet
still to be agreed. 
Sustainable Transport
In order to support and deliver on the strategic goals set out in the NHS Scotland Climate
Emergency and Sustainability Strategy (2022-2026) as well as our own NHS Ayrshire and
Arran Climate Change and Sustainability Strategy (2021-2032) and Anchor/ Community
Wealth Building Strategy (2023-2026) we have formed an Active Travel and Sustainable
Transport sub group of our Climate Emergency and Sustainability Operational Group
(CESOG). With the support of Travelknowhow Scotland, the group has prepared an Action
Plan for NHS Ayrshire and Arran on Sustainable Travel for the three financial years (2024/25
to 2026/27).  The Action Plan sets out how we will implement actions towards the
organisation’s overall strategic goals on sustainable travel, and how we will monitor
progress. 
367

Page 368

The action plan is informed by and interfaces with national, regional and local transport
policy and strategy which includes the Scottish Governments Transport to Health Delivery
Plan. The Action Plan provides a framework for practical measures tailored to the needs of
the organisation, individual sites, employees, patients, and visitors. It will be reviewed and
updated on a regular basis to ensure its relevance and to maintain progress on strategic
goals.  Actions are grouped according to six themes: 
• Governance, monitoring, and reporting
• Reducing the need to travel
• Enabling active travel
• Promoting public, community, and shared transport
• Decarbonising our fleet and business travel
• Reducing single occupancy car use 
There continues to be positive engagement and support in both the development and
implementation of the action plan from across NHS Ayrshire and Arran and with support
from NHS Assure and our partners in Ayrshire Roads Alliance, North Ayrshire Council and
Strathclyde Passenger Transport. Although positive progress has been made to date, there
remain clear challenges and risks which include our capacity to deliver the actions, the
ongoing capacity and engagement of our local transport partners and colleagues and limited
funding to take work forward in the manner and at the pace we would like.
Antiracism Strategy NHS Ayrshire and Arran
The development of an anti-racism strategy is being led by the Organisational and Human
Resource Department and Public Health with support from the NHS Ayrshire and Arran
Inequalities Lead and will report back to Scottish Government on progress early 2025. 
Aims/Objectives 2025-2026 (Year 1) KPI
Reduce the difference in screening uptake between the
most and least deprived quintile for each of the three
cancer screening programmes.
Improve cervical screening uptake in deprived
areas by 20%. 
Improve breast screening recall appointment
uptake by 40%. 
Improve bowel screening uptake in prison by
40%.
Increase HIV prevention, detection and retention in care.  100% of new diagnoses have completed
lookback review. 
Reduce late diagnosis of HIV to zero.   
Increase testing for HIV by 30% compared to
Q4 2024/25.
Work towards viral hepatitis elimination goals, including
through achieving Board-level HCV treatment initiation
targets.
Improve HCV treatment uptake by 100% on
Q4 2024/25
Improved access of Long-Acting Reversible Contraception
(LARC), including post-abortion and postpartum.
Improve overall LARC uptake by 40% on Q4
2024/25
Improve population health, with particular focus on
smoking cessation and weight management priorities.
Smoking Cessation 
Increase referrals by 5% each quarter 
Weight Management 
368

Page 369

Diabetes prevention (including Gestational
Diabetes Mellitus (GDM): Aim to offer
treatment and support to 200 people 
Tier 2 weight management: Aim to offer
treatment and support to 200 people
Tier 3 weight management: Aim to offer
treatment and support to 150 people
Remission programme: Aim to offer treatment
and support to 15 people 
Actions
2025-2026 (Year 1)
By When
Cancer Screening Programmes
- Widen cervical screening outreach clinics to include
more deprived areas with low uptake;
- Implement transport initiative for recall breast screening
appointments to improve uptake for those women
experiencing travel inequalities and low income; and
- Improve staff awareness and uptake of bowel screening
in the local prison population.
March 2026
Blood Borne Virus (BBV)
- BBV service review, including review of BBV testing
policy;
- Management of BBV exposure policy; 
- Implementation of BBV diagnosis lookback; and
- Reducing stigma education campaign.  
March 2026
HCV treatment initiation targets
- Improvements to prison Sexual Health and Blood Borne
Virus (SHBBV) pathway, including dedicated testing
clinics and NearMe consultations;  
- Pilot of community treatment; and 
- Pilot of DBS testing in pharmacies.
March 2026
Smoking Cessation
Increase number of referrals to smoking quits by the
specialist Quit Your Way cessation service from 
- Acute
- Maternity 
- Mental health services and 
- From those living in our 40% most deprived communities 
Develop, deliver and evaluate pilot which utilises QYW
staff to address the wider determinants of health,
including those which may make it more difficult to stop
smoking.
March 2026
Diabetes Prevention and Adult Weight Management
Services 
- Provision of care for women at risk of gestational
diabetes (GDM) post-natally;
- Provision of early intervention and support for those at
high risk of type 2 diabetes;
- Provision of person-centred weight management support
for those with a high BMI; and 
- Provision of a type 2 diabetes remission programme
involving total diet replacement treatment for those
recently diagnosed with type 2 diabetes.
March 2026 
369

Page 370

3. Quality and Safety 
NHS Ayrshire and Arran’s Quality Strategy describes our commitment to deliver quality
improvement and high quality care that will enable and support delivery of our strategic
objectives, and our ambition for health and care service transformation. The Healthcare
Governance Committee proposed that the current Quality Strategy would be extended to
include the period 2023-2025 and this was supported by the Board members. An evaluation
of the impact of the current Quality Strategy will begin in January 2025, with a report detailing
the findings published in July 2025. Consultation and co-design with a range of stakeholders
to guide the direction of NHS Ayrshire and Arran’s future Quality Strategy will begin in
January 2025 with a revised Quality Strategy published in 2026.   
Excellence in Care (EiC) is a national approach which aims to ensure people have
confidence they will receive a consistent standard of high-quality care no matter where they
receive treatment in NHS Scotland.  Commissioned by the Scottish Government in response
to the Vale of Leven Hospital Inquiry recommendations, Excellence in Care seeks to
improve, integrate and coordinate the way quality care services are delivered.  The NHS
Ayrshire and Arran EiC team conduct data surveillance of all reportable measures on a
monthly basis. Additionally, provision of EiC data to senior leadership and healthcare
governance team is included in all directorates’ quality and safety papers. Quality data is
sent from our local data management system to Senior Charge Nurse’s, Clinical Nurse
Manager’s and Senior Management monthly, to give an oversight of compliance with each
of their measures.  This provides the opportunity for these staff to review compliance and
identify any issues/risks and where possible make changes. 
Aims/Objectives 2025-2026 (Year 1) KPI
Deliver quality improvement and high quality care to enable
and support delivery of our strategic objectives, and our
ambition for health and care service transformation. 
Delivery of Strategic Objectives 
Actions
2025-2026 (Year 1)
By When
Evaluate the impact of the current Quality Strategy with
findings published in July 2025. 
July 2025
Develop and publish revised NHS Ayrshire and Arran
Quality Strategy
March 2026
Evaluate, re-design and implement Quality and Safety
Walkrounds 
July 2025
Co-design a Quality Improvement Capacity and
Capability Strategy 
August 2025
Develop and publish Duty of Candour Policy  June 2025
Develop and implement an improvement plan to reduce
overdue Significant Adverse Event Review (SAER)
reports and action plans
June 2025
370

Page 371

Review of Nursing, Midwifery and Allied Health
Professionals audit templates and operational
definitions to ensure standardisation of reporting
December 2025 
Launch and implementation of reviewed Care
Assurance Boards in in-patient areas
December 2025 
Increase the number of users accessing the Care
Assurance and Improvement Resource (CAIR)
Dashboard by 50% 
October 2025 
Implementation of Healthcare 
Improvement Scotland (HIS) Quality of Care 
Review Process
September 2025
All relevant staff are face fit tested to an FFP3 respirator
to support business as usual patient care and in the event
of responding to an incident such as Mpox Clade1 and
Measles. 
- Sessions have been established on our Acute sites in
rotation for half a day weekly to provide testing to those
staff requiring a test.
- Upscale of addition sessions is being planned should
this be required.
March 2026 
4. Value Based Health and Care 
The Realistic Medicine team continue to support the 13 high level actions from the Chief
Medical Officer’s Value Based Health and Care Plan (October 2023). This seeks to use the
principles of Realistic Medicine as an approach to achieve this. We have set out a delivery
plan that aligns to these objectives.  The main constraints to this are the limited resources
that compose the Realistic Medicine team and of the limited service engagement resulting
from a stretched and under-pressure healthcare system.
There will be ongoing work within the Realistic Medicine Team to take forward the aims of
Value Based Health & Care (VBH&C) whilst we transition to the Realistic Care Improvement
Programme.   This will enable NHS Ayrshire and Arran’s reform to be viewed through the
lens of VBH&C and an opportunity for Realistic Medicine to support embedding VBH&C into
the heart of reform and improvement.
Going forward the aims and objectives of the Realistic Medicine teams will be advanced in
collaboration with the Realistic Care Improvement Programme at a strategic level.   The final
development plan for year 2025/2026 will be integrated into the existing plan. 
Aims/Objectives 2025-2026 (Year 1)
Increase Awareness: Raise public awareness of Realistic Medicine and the need for NHSScotland to
steward its resources well particularly via social media. 
Encourage Shared Decision-Making (SDM): Ensure all health and care professionals engage in shared
decision-making and promote the “It’s OK to Ask” campaign. 
Service Users to Utilise BRAN Questions and encourage them to ask their health and care professionals
the BRAN questions. 
Improve Communication: Enhance health and care professionals' communication skills, focusing on clear,
accessible information and patient preferences, encouraging Shared Decision Making.
371

Page 372

Sustainability and Unwarranted Variation: Develop tools that enable health and care colleagues to seek
out and eliminate unwarranted variation in access to healthcare, treatment and outcomes.
Focus on Resource Management: Prioritise initiatives to reduce waste and harm, including overprescribing
and unwarranted tests. 
Innovation: Empowering the workforce to be improvers and innovators, bringing services closer to our
community in line with Caring for Ayrshire. 
Actions
2025-2026 (Year 1)
By When
Social Media Promotion of Realistic Medicine externally
in collaboration with the Communications Team, including
via the organisation's X and Facebook accounts.
Use of videos/information available via the national RM
website.
Communication and engagement plan to be
developed by June 2025 
BRAN Publicity materials available from NHS 24.
Promotion of BRAN internally via Viva Engage,
Communication Team and other internal methods of
communication. 
Ensure BRAN questions are included on all outpatient
appointment letters. Trial of appointment letter leaflets at
Rainbow House Child Development Centre. 
BRAN information visible in waiting rooms to enhance
decision-making via posters and note paper.  Show
BRAN/RM videos on screens within waiting areas.
June 2025 
September 2025 
September 2025 
Continue to evaluate the CollaboRATE SDM measuring
tool which is now embedded with Patient Experience
Survey across Acute sites. 
March 2026 
Health and Care professionals will be encouraged to
complete TURAS training via promotion on Viva Engage,
eNews and other methods of internal communication.
March 2026 
Assist the Right Decision System steering groups to
introduce best practice pathways for NHS Ayrshire and
Arran. 
December 2025 
Encourage collaborative work that promotes the interface
between Primary and Secondary care.        
Ongoing
Enable CDFs to carry out QI work relating to variations in
practice and resource management.
December 2025
Establish a Primary Care Teams Channel to collate
successful QI projects that could inform Steering Groups
and enable a learning by doing and economy of scale
approach to developing new pathways.  
June 2025
Engage with QI to determine whether VBH&C can
become an educational element of AAIFS.
September 2025
Explore use of Demand Optimization Dashboard for
Laboratory Diagnostic Tests with in Primary Care. 
December 2025
Support permanent introduction of Neptune Waste
Management System supporting National Green Theatre
programme.
September 2025 
Representation on Pharmacy Effective Prescribing
Groups. 
Ongoing 
Near Me Projects - Continued support/exploration of Near
Me projects within Breast, Preoperative and Cochlear
Implant services. 
Development of trials of Near Me within care home
settings, Tissue Viability Nurse service,
December 2025 
372

Page 373

Neurodevelopmental Empowerment and Strategy (NEST)
Team and Rainbow House Child Development Centre. 
5. Women and Children’s Health 
Women’s Health Plan
NHS Ayrshire and Arran is committed to contributing to the outcomes outlined in the National
Women’s Health Plan for Scotland which underpins actions to improve women’s health
inequalities by raising awareness around women’s health, improving access to health care
and reducing inequalities in health outcomes for girls and women, both for sex-specific
conditions and in women’s general health. Actions to achieve this across Ayrshire and Arran
requires cross departmental and multi-agency support and action. The two leading
directorates for the strategic vision and delivery of this are Women and Children’s Services
and Public Health.
Building on previous activity, the Women’s Health Plan Strategic Oversight Group (WHP
SOG) was established in 2024, to deliver the ambitions of the WHP.  The group is co-chaired
between Women and Children’s Services and Public Health with representation from across
the Board to drive forward actions.
The ultimate aim of the women’s health plan is to improve the general health and wellbeing
of all women and girls, whilst reducing health related inequalities. The underpinning tenants
of Realistic Medicine and Value Based Health and Care will be integral to delivering
meaningful change and improvement for the population of Ayrshire and Arran. A new
iteration of the plan is expected in the coming years and will feed into the work of the WHP
SOG.
Moving into 2025/26 the priorities will be to continue to deliver against the NHS Ayrshire and
Arran Women’s Health action plan with the currently identified priorities of pre-conception
care, endometriosis, and menopause. We will continue to monitor and implement the
national Menopause and Menstrual Health Policy within NHS Ayrshire and Arran and
improve the support provided to our staff.  
It is recognised that there are nationally significant challenges for patients accessing
gynaecological appointments and laparoscopic surgery for the diagnosis and treatment of
endometriosis.  NHS Ayrshire and Arran recognise the challenges in providing access to
endometriosis care and surgery and the associated risks and recognise that endometriosis
is a progressive disease, and the current wait times increase the risk of the disease
becoming more complex, requiring more costly and specialist care.  
Work has been underway in 2024/25 to redevelop a cohesive pathway for Polycystic Ovary
Syndrome (PCOS) patients across both primary and secondary care services. It is expected
that this pathway will be presented to governance groups for approval in the final quarter of
2024/25 with a launch in early 2025/26 with ongoing monitoring of impact.  
373

Page 374

Following on from this the next pathway which will be reviewed and improved is the
endometriosis pathway, including the creation of dedicated assessment clinics and
implementing patient initiated reviews. Waiting times for endometriosis assessment have
remained high and this action will seek to address some of the drivers of these long waiting
times. 
The women’s health academy seeks to create better training and competence within primary
care staff to be able to diagnose and manage women’s health concerns more robustly at
the point of presentation. This will not only improve the service provided to patients, reduce
demand on secondary care services but also promote career development for primary care
staff to be strong advocates for women’s health within their settings. 
During the period of time when families are planning a pregnancy they may not be in routine
contact with healthcare services, however this is a time when optimal health is important to
provide the best possible chance of a successful pregnancy. A board wide Short Life
Working Group will explore what information and support families need during this time and
how best to deliver this. 
Cardiovascular disease is often under-recognised and diagnosed in women. Early
identification and modification of risk factors can improve long term outcomes. Therefore a
test of change based within primary care services will seek to explore how CVD screening
can be delivered through routine appointments to begin the journey of early identification
and management. 
As we continue our journey towards supporting staff experiencing challenges associated
with menstrual health and the menopause a key priority for 2025/26 will be to establish a
network of Women’s Health Champions to provide staff support. The primary remit of this
network will be to provide peer based support to understand the support available within the
organisation, signpost to and provide training to staff and line managers and continue to
create a culture of openness and awareness. 
Health Visiting and Family Nurse Partnership 
The universal child health reviews are core to the Universal Health Visiting Pathway. The
reviews provide an opportunity to work with parents to assess children's wellbeing, provide
age-appropriate health promotion advice, build parenting capacity, identify needs for
support, and facilitate early access to effective interventions. Within 2025-26 all eligible
children will continue to receive child health reviews at 13-15 months, 27-30 months, and 4-
5 years from a qualified Health Visitor or Family Nurse, with ongoing review and assessment
of staffing across children's health services, to ensure assessments continue to be
completed by qualified HV/FNs.  Continue to work with partners to build on understanding
of wider determinants of health with regards to insecurity of income, housing and food across
the life course.   
There is extensive evidence on the benefits of breastfeeding on the short and long term
health of mothers and their babies. The percentage of babies who were exclusively
breastfed in 2023/24 at NHS Ayrshire and Arran level was 25.6% - that is the highest rate
we have achieved since the Pre-School Child Health Surveillance data has been published
since 2002/03. Breastfeeding initiation, exclusive breastfeeding rates at 11-14 days (first
Health Visitor visit) and at 6-8 weeks has increased at Ayrshire and Arran level and for each
374

Page 375

local authority area, with the exception of rates at 6-8 weeks in East Ayrshire. These positive
statistics demonstrate that the culmination of work we have been doing collectively across
midwifery, health visiting and family nurse services, including our specialist maternity and
community infant feeding teams, over the last few years is starting to build momentum. 
In addition, the significant investment made by the Health and Social Care Partnerships to
enable ongoing work with a third sector partner who provides mother to mother
breastfeeding peer support, is clearly contributing to this change. Over the last year, the
maternity service and neonatal unit at Ayrshire Maternity Unit achieved UNICEF Baby
Friendly reaccreditation and the health visiting and family nurse service achieved
reaccreditation with Gold Baby Friendly status. 
Public protection 
There is a well-established safeguarding team within maternity and neonates. However, it
has been identified that there is not a consistent approach throughout women and children’s
services as a whole.  To ensure a more robust approach a lead for public protection within
Women and Children’s Services has been identified to establish a consistent and robust
nonperson dependant approach within the women and children’s directorate. 
Maternity 
NHS Ayrshire and Arran continue to deliver on recommendations from the Best Start
national Policy to ensure women and their families have a positive experience of maternity
and neonatal care which takes account of their individual needs and preferences. It is
important that all families are aware of the support and choices that are available to them in
order that they can be partners in care and achieve the best outcomes for them.  Of the 76
Best Start recommendations we have seven remaining as still to meet locally and three of
these require Scottish Government input. 
We require support to progress further with key challenges around lack of recurring funding
for midwifery care, lack of community estate to deliver statutory maternity care in community
settings, a rise in morbidity for the care model and continuity of carer in the high-risk
pregnancies. The non-recurring funding for Best Start has now ceased. This will impact on
our ability to continue to implement recommendations, this issue exists for all health boards. 
Nationally there is a review of the impact on maternity in relation to the implementation of
the neonatal Best Start recommendations and locally we have commenced our own data
capture.  Locally community accommodation has been reviewed with no solutions agreed
and this is being further impacted by local distributed working arrangements and further
estate reduction.
Gynaecology 
We continue to develop and implement a Gynaecology Outpatient Procedure Unit for
patients requiring clinical interventions, which may have previously required a theatre
session and subsequent in-patient stay. This has been developed and will be implemented
within current estate in Ayrshire Maternity Unit in 2025. 
Paediatrics
375

Page 376

We will look at expansion of direct access to Paediatric Assessment Unit (PAU) for GP
referrals, negating any unnecessary time spent in Emergency Department (ED) for triage,
unless clinically required. Developing measurable outcomes will evidence compliance on
ED attendances after GP referral and 4-hour compliance from attendance at PAU to
discharge or admission.
To ensure on-going consistent exacting standards of high dependency critical care delivery
it is essential to support a planned programme of staff attendance in the recognised critical
care education. 
Neonates
Neonatal services, now a recognised local neonatal unit in keeping with Best Start
recommendations has well embedded criteria for admission in Ayrshire and transfer to the
tertiary unit in Queen Elizabeth University Hospital for delivery and then repatriation here as
appropriate. 
The Unit occupancy remains consistently in keeping with the required number of respiratory
care days, high dependency intensive care days and number of exceptionally low birth
weight babies cared for in the current recommendations for a local neonatal unit. 
Support with the on-going succession planning for the Advanced Neonatal Nurse
Practitioner team is acknowledged along with the recent approval of a sixth neonatal
consultant appointment. 
These on-going service developments and appointments will continue to enhance safe and
effective service delivery and sustainability. 
Aims/Objectives 2025-2026 (Year 1) KPI
Maternity Strategy (Best Start) – National review of
continuity of care model and sustainability of service
delivery.
National driver – local benchmarking 
assessment will be used to determine our 
RAG status as we progress.
Development of a Gynaecology (Gyn) Outpatient
Procedure Unit within Ayrshire Maternity Unit for patients
requiring clinical interventions, which may have required a
theatre session and subsequent IP stay.
Completion of planned moves, and uptake of
additional services including new colposcopy
suite.
Expansion of direct access to Paediatric Assessment Unit
(PAU) for GP referrals.
Scoping and service definition to be prepared
prior to implementation plan.
Deliver care in line with expectations for a ‘local’ neonatal
unit and in keeping with BAPMM guidance.
Data available from Badgernet system. 
Evaluation of implemented in-utero transfer 
form.
Staffing and competency for high-dependency (critical
care) beds.
Competency framework completion – 
determination of staff percentages completing
critical care academic training.
Ensure a robust approach to safeguarding that is
consistent across the Women and Children’s directorate.
Placement of Public Protection midwife and
associated delivery plan. 
Actions
2025-2026 (Year 1)
By When
Maternity - Progress national overview of continuity of care
model. 
March 2026
Maternity - Carry out a review to identify accommodation
for community midwives to deliver care.
October 2025
376

Page 377

Gynaecology - Forecasting of procedures to be transferred
from IP theatre list to Gyn OP procedure unit and impact of
waiting times.
December 2025
Gynaecology - Review of accommodation within Acute
Maternity Unit footprint and estates work required to
develop Gyn OP procedure unit.
August 2025
Paediatrics - Change the service model to negate
unnecessary time spent in Emergency Department for
triage, unless clinically required.
March 2026
Public Protection
Establish a lead for Public Protection within the
directorate.
Expand the approach current in Maternity and Neonates
towards consistency across the directorate. 
June 2025 
March 2026
Women’s Health Plan
- Launch revised PCOS Pathway;
- Review Endometriosis Pathway;
- Launch Women’s Health Academy;
- Establish a preconception SLWG to provide board wide
recommendations;
- Implement a test of change in primary care practice to
explore cardiovascular screening for women at routine
appointments; and 
- Recruit and train Women’s Health Champions to provide
a staff support network.
March 2026
East Ayrshire
- Implement the East Ayrshire’s Cherishing Our Families
Strategy and the Safe and Together model of practice;
- Improve holistic family support for children affected by
drugs and alcohol;
- Implement the Health Visiting Pathway and
Breastfeeding Friendly - Early Learning Scheme;
- Provide every child with the  access dental care and oral
health education/support;
- Support children and young people to access
neurodiversity supports;
- Provide access to training in mental health interventions; 
- Implement Trauma Informed Contact and Care; and
- Pilot Equally Safe at School resource (EA Violence
Against Women's Partnership). 
March 2026
Breastfeeding – Pan Ayrshire
• To implement the Breastfeeding Friendly Scotland
Early Years and Local Authority Schemes across
Ayrshire; and
• To continue to increase breastfeeding rates across
Ayrshire at the first Health Visitor visit and the 6-8
week Health Visitor visit. 
March 2026 
Ongoing 
6. Planned Care   
There is considerable overlap between planned care and cancer services and performance
measurement, and so we progress the planning of these two areas together. This plan
presents both the planned care and the cancer planning in order to avoid duplication. 
The Planned Care and Cancer Delivery Plan incorporate the “core” activity which can be
delivered by the available funding through the previously agreed Board allocation, in addition
377

Page 378

to the additional activity which has been commissioned through additional Scottish
Government funding in 2025/26. This additional funding totals £7.04M plus a further £1.65M
for mobile MRI scanners. The detailed plan associated with this funding is set out on the
Planned care planning template document. The plan assumes that discussions regarding
the Board’s financial position do not result in any adjustment to the allocation of planned
care funds.  
Planned Care
As we move into 2025/26 we recognise a number of significant challenges to the delivery of
planned care.   
The steady increase in urgent care demands continues to result in planned care capacity
being reduced with increasing workforce resources re-assigned to support urgent care
needs. 
The proportion of referrals into planned care being made on an Urgent Suspicion of Cancer
and Urgent basis has increased significantly. The result is that much less capacity remains
for routine-priority cases which generally represent the longest waiting patients. It also
places significant pressure on the cancer pathways which are required to manage much
larger volumes of referrals with minimal increase in the number of cancers diagnosed. 
The Board continues to face significant recruitment challenges. This includes a number of
clinical specialties with notable numbers of long standing consultant vacancies, particularly
in some of the medical specialties. 
There remain some facility-based constraints which arose as a result of changes made
during the COVID-19 pandemic, which have not since been possible to reverse. In particular
the loss of the UHC day surgery unit, and recovery area for endoscopy are notably reducing
the operating theatre and endoscopy capacity and productivity.
Cancer
NHS Ayrshire and Arran’s key priorities reflect the vision and priorities set out in the Scottish
Government’s Cancer Action Plan 2023 to 2026 to improve cancer survival and provide
excellent, equitably accessible care to all.  The aim is to ensure that people living with
cancer, their families and carers are at the heart of cancer services, and a focus on reducing
inequities in access to cancer care and cancer outcomes, recognising each person’s time
of need. 
However, there are a number of challenges faced in the delivery of cancer services. There
has been a sustained increase in demand, with a significant increase in the number of
Urgent Suspicion of Cancer referrals. This places significant additional demand on the
diagnostic parts of the pathway required to diagnose cancer pathology. The actual number
of cancers diagnosed has risen, but by a smaller amount. 
There is a particular capacity challenge in relation to the prostate cancer pathway, with the
most significant shortfall relating to operating theatre capacity for robot assisted surgery. It
is also anticipated that there will be a significant increase in demand for both the diagnostic
and treatment elements of the prostate cancer pathway during 2025/26 resulting from the
impact of a recent high-profile prostate cancer case. 
378

Page 379

Diagnosis of cancer is becoming an increasingly sub-specialised area. As a result there are
capacity based bottlenecks for certain cancer pathways within Pathology and Radiology in
particular. 
Within radiology, there is a capacity constraint impacting the cancer service in relation to
MRI and ultrasound. The National Plan for imaging is expected to address the ultrasound
aspect, but there will remain a capacity shortfall for MRI. 
Diagnostic capacity in endoscopy related to the reduced recovery facilities at UHC impact
the upper GI and Colorectal pathways.
There are significant challenges with West of Scotland oncology capacity, and also capacity
for PET scanning. 
A number of cancer pathways have identified unfunded shortfalls in consultant capacity.
Against this backdrop the Board will prioritise work which further progresses the five main
areas of focus: 
1) Understanding the changing service demand and capacity
• Through 2024/25 additional DCAQ analysis has provided further insight into particular
areas of pressure. All individual specialties have either completed or are in the
process of updating DCAQ analysis; 
• Consultant job planning, including the use of the Allocate job planning system for the
first time in NHS Ayrshire and Arran, will further support this work but allowing a much
clearer identification of core capacity and will support development of tools to monitor
delivery of clinical activity against the expected levels;
• We have also completed a review of theatre (nursing capacity) in order to better
understand the capacity and workforce shortfalls in this area, and further discussion
will progress consideration of this outcome within the available funding envelope; 
• We will develop an online referral guidelines portal using the Right Decisions
Platform. This tool will be co-produced between primary and secondary care and is
expected to positively impact on ensuring that the right patients reach the right
service, first time; and
• We will review our robot assisted surgery capacity, particularly in relation to capacity
for prostate cancer surgery, and will participate in ongoing regional and national work
to identify opportunities to increase surgical capacity to improve the prostate cancer
pathway. 
2) Productivity and Efficiency Opportunities
• Close monitoring of theatre utilisation continues to be a feature of “business as usual”
within the Board, and this is evidenced through the strong theatre utilisation
performance data. We plan to introduce the national theatre scheduling solution in
2025/26 and will closely monitor the impact that this has on both utilisation and
productivity; 
• Through the newly created “outpatient utilisation group” we will review and progress
initiatives to further increase efficiency and productivity through setting local targets
and action planning to improve DNA rates and reduce Review:New ratios; and 
379

Page 380

• We will ensure that our waiting lists are up to date with an ongoing in-house
programme of outpatient waiting list validation, and through bi-annual validation of
the IP/DC waiting list through the established National Elective Coordination Unit
(NECU) process. 
3) Modernisation
• In 2024/25 we held 2 “summit events” which supported our clinical teams to focus on
opportunities to modernise their planned care services. Following on from that we will
support the teams in the further expansion of Active Clinical Referral Triage (ACRT)
and Patient Initiated Review (PIR) through a programme managed approach; 
• Implementation of the Ophthalmology Open Eyes system is expected to support more
patients being managed within the community setting, and a reduction in demand for
the acute service;
• Implementation of the Digital Dermatology Service is expected to support a reduction
in demand through improved referral information. Subject to continuation of funding,
we anticipate that this development will run in parallel to a NECU-led campaign using
the same technology which will also enable mutual aid support from other NHS
Scotland Boards to NHS Ayrshire and Arran in order to reduce the dermatology
backlog; 
• We will develop an online Referral Pathway guidance portal which we anticipate will
lead to improved appropriateness of referrals, ensuring that patients reach the right
service first time. This may also contribute to reducing the increase in referral demand
both for general referrals and for urgent suspicion of cancer referrals. Within the
cancer pathways in particular, reducing overall demand and so enabling faster review
and diagnosis we anticipate that this will positively impact on cancer stage of
diagnosis;
• We will work towards implementation of optimal cancer pathways in the lung cancer,
head and neck cancer and colorectal cancer pathways subject to the availability of
the necessary resources and funding; 
• We will continue to deliver a Rapid Cancer Diagnostic Service, subject to continuation
of funding; and
• We will use QPI data to drive further improvement in cancer care and outcomes,
coordinated through our new Cancer Management Group. We will focus on specific
priority QPIs, namely Upper GI QPI11 by exploring the opportunity to identify cancers
at pre-symptomatic endoscopies using available technology, Melanoma QPI6 and
QPI7 by reviewing the pathway and improving the process for notification of
melanoma diagnosis. 
4) Investment in Sustainability
• Significant recurring investment of Access funding has already been targeted at
orthopaedics, endoscopy and CT scanning services, and additional investment
during 2024/25 prioritised Anaesthesia, Urology and Diabetes and Endocrinology. 
• Additional areas for recurring investment have been agreed and will be implemented
in 2025/26 including ENT surgical staffing, Neurology medical staffing,
Gastroenterology multidisciplinary team, Breast Radiologist and operating theatre
nursing. Additionally additional Orthopaedic surgeon staffing which had previously
380

Page 381

been put in place non-recurringly has now been allocated recuring funding by Scottish
Government subject to delivery of agreed additional activity. 
• We will work locally, and with regional colleagues to develop plans for sustainable
delivery of oncology and SACT services. This will include development plans for the
establishment of safe and appropriately sized oncology ward facilities within the
Board, as well as supporting regional development of a Target Operating Model for
Oncology. We will continue to further develop local SACT capacity through workforce
diversification and expansion where funding allows. 
5) Tackling Long Waits
• We will continue to target the longest waiting patients, where capacity allows and
within the context of relevant clinical prioritisation. The longest waiting TTG patients
will be tracked individually with action plans developed for each; 
• Short term additional capacity to address the longest waiting patients will be put in
place in line with agreed Scottish Government funding plans. This includes
recruitment to additional fixed term posts in General Surgery and Orthopaedics.  This
will also include contracting of independent sector capacity and waiting list initiative
type approaches; 
• There has already been considerable investment to reduce waiting times in
orthopaedics. The development of a business case for development of a National
Treatment Centre outlined the requirement for further investment in service and
capacity in order to manage demand, and although this particular project has been
paused, we will continue to engage with Scottish Government colleagues to consider
how this significant capacity shortfall can be addressed, and we will actively
participate in the development of an Orthopaedics National Plan; and
• Recognising that ophthalmology and gynaecology are two other areas of national
priority, and that we have some waiting list challenges in these areas, we will seek to
identify opportunities to establish additional capacity as funding allows but
recognising also that NHS Ayrshire & Arran has a number of other waiting times areas
of particular high priority, most notably within some outpatient specialties.
Prioritisation of resources will reflect the respective level of risk and challenge. 
Aims/Objectives 2025-2026 (Year 1) KPI
Address Long Outpatient waiting times working towards
target of no patients >52 weeks by March 2026.
WL Size = 42436
>52 Wks = 3713
Address Long Inpatient/Daycase waiting times working
towards target of no patients >2yrs by March 2026.
WL Size = 6554
>52 Wks = 631
Reduce waiting times for Medical Imaging Investigations
working towards maximum 6 week wait by March 2026.
WL Size = 2041
>6 Wks = 355
Reduce waiting times for Endoscopy working towards
maximum 6 week wait by March 2026.
WL Size = 1047
>6 Wks = 613 
Actions
2025-2026 (Year 1)
By When
381

Page 382

Increase planned care productivity in outpatients and
inpatients/daycases through a range of different actions.
March 2026
Optimise opportunities for regional working and mutual aid
through implementing a number of individual initiatives.
March 2026
Implement new digital solutions including Ophthalmology
Open Eyes, Digital Dermatology and Theatre Scheduling
tool.
March 2026
Deliver supplemental activity, in line with funding plan March 2026
Implement the initiatives supported by the National Plan
for Imaging.
March 2026 
6.1  Cancer 
Aims/Objectives 2025-2026 (Year 1) KPI
By Dec 2025 82% of all those urgently referred with a
suspicion of cancer are to begin treatment within 62 days
of receipt of referral.
82%
From March 2025 98% of all patients diagnosed with
cancer are to begin treatment within 31 days of decision to
treat.
98%
Identify and address areas of lower performance or clinical
concern through representation at WoSCAN Regional
Groups and continued engagement with local and regional
clinical leads.
Identified and addressed areas of lower
performance or clinical concern.
Support the development of a Target Operating Model for
oncology, and work across the region and locally to
address shortfalls in oncology capacity.  
Development of a Target Operating Model for
Oncology
Ensure earlier and faster diagnosis at stage I and II in line
with Cancer Strategy.
Earlier and faster diagnosis at stage I and
stage II 
Actions
2025-2026 (Year 1)
By When
Ensure sufficient diagnostic capacity to support cancer
pathways, through implementation of a range of actions.
March 2026
Use QPI data to focus on and address particular shortfalls
in cancer pathways.
March 2026
Support the development of a Target Operating Model for
oncology, and work across the region and locally to
address shortfalls in oncology capacity
March 2026
Ensure focus on achieving faster and earlier diagnosis
through implementation of optimum cancer pathways and
other actions.
March 2026 
6.2 Musculoskeletal Health 
Musculoskeletal (MSK) conditions continue to be one of the leading causes of sickness
absence across Scotland and constitutes 30% of the primary care demand.  With increasing
demand and complexity of presentation there is acknowledgement that the MSK Service
needs to develop new models of care to better support citizens to access the right care in
382

Page 383

the right place at the right time.  A key priority of the service in delivering this goal is
development of a digital platform to enable patient initiated access and supported self-
management.  This would also bring benefit to primary care and unscheduled care services. 
The development of a digital platform would enhance the existing digital resources already
in place within the service with the Ayrshire and Arran MSK website and social media already
having good engagement.  The community appointment day (CAD) model is another service
development which is seen to be key in better supporting patients in a more timely manner
while improving access to the service.  In delivering new models of care the expectation is
that the performance against the 4 week waiting target improves in line with the national
average.  
Aims/Objectives 
2025-2026 (Year 1)
KPI
Increase compliance with national MSK 4 week waiting
time target
Improve percentage compliance with 4 week
waiting time target to 40% by December 2025
across Physiotherapy, Occupational Therapy
and Podiatry MSK services.
Develop new models of care which support management
of demand into MSK Services 
Increase website engagement by 20% by
December 2025.
Facilitate recruitment and retention of MSK workforce 100% of staff have a job plan relevant to their
job role by June 2025. 
Introduce and recruit to MSK podiatry
development post by December 2025. 
Actions
2025-2026 (Year 1)
By When
4 week waiting time target
• Develop MSK Performance Measurement Plan
• Test texting patient with invite to treatment to enable
patient focussed booking
• Review of MSK conditions where Active Clinical
Referral Triage (ACRT) has been implemented and
expand to other presentations if able 
• Routinely use MSK HQ outcome measure at entry and
exit from service
• Review of MSK referral and vetting guidance
• Test early intervention clinic within South locality and
assess impact on waiting times with a view to
replicating in East and North 
August 2025
August 2025 
December 2025 
March 2026 
June 2025
August 2025
Develop new models of care which support
management of demand to MSK Service
• Test texting patients with self-management advice
while on the waiting list
• Review MSK website content and update where
clinically required, improve health literacy, fix broken
links, inclusion of printable content
• Refine and further testing of Community Appointment
Day model including hosting events in the North and
South
• Robust training and education programme developed
for referrers to service 
• Develop digital patient initiated referral platform for
MSK Service 
December 2025 
October 2025 
August 2025 
March 2026 
March 2026 
383

Page 384

• Utilisation of Community Assets including engagement
with primary care; and increased targeted education
group clinics.
December 2025
Facilitate recruitment and retention of MSK
workforce 
• Review current clinical supervision arrangements
ensuring all staff have access to clinical supervision to
support staff wellbeing
• Embed and further develop development roles within
service to ensure resilience and succession planning
• Review of skill mix within the service including health
care support worker role
• Embed a robust MSK education programme for all
staff with collaborative delivery across all MSK teams
• Collaboratively deliver practice education placements
to reduce duplication and enable peer support for
students  
• Implement job planning for all staff within the service
• Progress a review to understand the factors currently
impacting on recruitment and retention of MSK
Physiotherapy staff 
September 2025 
March 2026 
March 2026 
December 2025 
March 2026 
June 2025
April 2025 
7. Unscheduled Care 
NHS Ayrshire and Arran has taken a ‘People First’ approach to aligning the unscheduled
care priorities and operational guidance through a recovery and reset programme of work
through Quarter 4 of 2024/2025.  This work focussed on immediate, short term and long
term plans to drive improvements on:
• Unscheduled care performance metrics;
• Quality of care;
• Patient safety; 
• Staff safety, morale and engagement; and
• Culture. 
It was acknowledged and recognised throughout the reset programme that we need to
‘break the cycle’ by carrying out a full reset of processes to support empowering staff to
deliver high quality care for all of our patients across our front doors and ward areas.
The Unscheduled Care Delivery Plan and improvement actions have been written from the
perspective of a refreshed approach across the whole patient journey to support the ‘right
care right place’ principles.
The plan outlines that we need to take forward a radical organisational journey of change
which requires high impact changes to support performance and quality of care.  This
programme of work also includes actions to support culture change and improve staff
engagement.  These plans fully align to the focussed piece of data and improvement work
carried out by the Centre for Sustainable Delivery in 2023 and throughout 2024.
The ‘People First’ initiative focused on three areas of change whilst supporting a financial
recovery programme and the ambition to drive best practice.  These are noted below in more
detail.
384

Page 385

1. Leadership
A senior leadership group was set up, over and above the existing unscheduled care
governance structure, to support the reset and recovery plan for Q4. This has ensured
executive level commitment along with enhanced oversight and governance arrangements
to drive and monitor the unscheduled care remedial actions to support the improvements at
both hospital sites.
The commitment to an open and transparent leadership approach was critical to support the
‘People First’ reset with a focus on improving culture and performance whilst balancing
quality and safety with front door overcrowding and consistent high occupancy on ward
areas.  The launch of the ‘People First’ reset has focused on zero tolerance to corridor care,
improving ambulance offloads and eradicating full capacity utilisation to support the
wellbeing of staff and the dignity of our patients.
2. Function
Flow
The development and governance to oversee the implementation and delivery of operational
strategies focused on reducing the front door overcrowding and performance. In depth
reviews were undertaken of the overcrowding across both sites.  Site wide processes have
been fully reviewed which has enabled an evidence based analysis of flow within areas of
the emergency care footprint, Scottish Ambulance offload delays, corridor care and flow
through the hospitals. 
The review of the site wide processes and gaps in process have been developed into a
detailed action plan across all divisions and areas.  These actions will support continuous
flow improvement which feeds into the reset and recovery plan for performance with the
ambition to improve our patients’ journeys through the acute sites.
A series of system-wide Multi-agency Discharge Event (MADE) took place over two weeks
followed by a two week recovery cycle with ward sponsors to support optimising discharges
and reducing bed occupancy through the Criteria to Reside process.  The learning from
these events has also informed the current detailed action plans.
Frailty Assessment Units
The frailty assessment units were mobilised at both hospital sites in November 2024, with
capacity to support patient flow, admission avoidance with Multi-disciplinary Team (MDT)
led board rounds. 
The initial 4 weeks evidenced 33%+ same day discharge. However, this has been impacted
with 12% same day discharge due to the restricted flow and productivity through the units
due to the site wide high occupancy due to the recent Winter unscheduled care demand.  
Monthly monitoring will continue through the reset and recovery process.
SAFER
Phase 1 of a SAFER ‘test of change’ - Senior review of all patients, supporting Flow and
Early discharge, supported by MDT Review) has been implemented at the University
Hospital Crosshouse site.  The first phase has evidenced a 2.5 day reduction in the LOS for
385

Page 386

two orthopaedic wards.  Quarter 4 of 2024/25 will continue with the embedding of the SAFER
board rounds. 
Phase 2 will commence in Quarter 1 of the 2025/2026 where the SAFER boards will be
expanded to other wards to support MDT input to reduce Length of Stay (LOS). 
Phase 2 will also include the replication of the SAFER process to commence at the
University Hospital Ayr site which will be initiated with the same training and workshops that
took place at the University Hospital Crosshouse site.
Length of Stay 
Site huddles have had a greater focus on LOS in the Emergency Department and initial
assessment units which has led to a new huddle process being implemented to support the
decompressing of the front doors through continuous flow. 
Weekly, long length of stay reviews on the wards have commenced at the University Hospital
Crosshouse site led by the Associate Medical Director for the site using an MDT approach. 
The challenge shared across the board is workforce challenges to support patient
discharges with higher packages of care and an improvement workstream to focus on
patients with delirium in the discharge process.
The weekly long length of stay review process will be implemented at the University Hospital
Ayr site during Q4 of 2024/25.
Measurement
The digital development needed to support the flow processes for unscheduled care has
been recognised as a priority area to progress to support live/same day data dashboards to
measure continuous flow and daily board rounds. This will be delivered in Q4 of 2024/2025. 
This will be an evolving area with service driven digital developments.  This will further
support the culture change journey to share progress on performance and quality with all
staff evidencing ‘good news stories’ on their hard work.
Best Practice
The engagement with staff through focus groups, wider engagement and workshops has
supported the ‘People First’ process with a refresh of roles, responsibilities and
accountability across the acute sites. 
This includes a review of job planning across the medical workforce and a review of what
resource is required to support 7 days working.
The education and coaching to support best practice processes, SOPs and board rounds to
enable optimal flow across both sites forms part of the enablers needed to deliver the
2025/2026 Delivery Plan to provide a resilient workforce across the acute sites.
The narrative outlined above and the delivery plan outcomes and objectives below and in
the spreadsheet builds upon the reset and recovery which has been mobilised through
2024/2025 through the ‘People First’ process and plans. 
Aims/Objectives 2025-2026 (Year 1) KPI
386

Page 387

Improve overall ED 4hr compliance (both unscheduled and
scheduled attendances) 
To at least 80% by March 2026
Reduce time in Emergency Department  New metric to be measured:
Time to Initial Assessment within 15
minutes = 70% compliance by March
2026 
Reduce LOS in ED (daily average)  = 17
by March 2026         
Reduce 12 hour breaches = 10 by
March 2026
Improve Ambulance handover times and hours lost  72% within 60 minutes by March 2026
Reduce SAS conveyances using alternative pathways 6% reduction target by March 2026 
Increase >65s discharged from CAU : 
LOS<72 hours  68%
Reduce total delayed discharges for all 3 partnerships <95 by March 2026
Frailty assessment and flow  Same day discharges 50% by March
2026
Reduce bed occupancy and LOS 20% reduction in geriatric LOS and 
20% reduction in acute hospital LOS 
Reducing length of stay over 14 days  No of patients non-delay LOS >14 days 
Reducing length of stay for those aged over <65 and >85  20% reduction in geriatric LOS and 20%
reduction in acute hospital LOS 
Develop automated digital site sitreps for circulation 3 times a
day, 7 days per week 
To be scoped – Quarter 1
Develop live digital dashboard for ED performance from
Symphony and TRAKCARE 
Quarter 2
Allied Health Professionals
Contribute to the delivery of Caring for Ayrshire models of care
in relation to reablement, end of life care and frailty. 
Improve care pathways providing the right care, from the right
person at the right time. 
Funding and targets to be agreed. 
Increased activity through frailty
assessment units at both sites. 
Reduced LOS for palliative patients and
frailty patients  across both sites
supported by 3 IJBs community 
provision and access to community
beds. 
Action
2025-2026 (Year 1)
By When
Identification of further triage space/changes to environmental
structures within the Emergency footprint to support timely
patient assessment.
Quarter 1
Reset of CAU processes and twice daily board rounds  Quarter 1 
387

Page 388

Implement 2 hourly huddles to support list reviews and
escalations.
Quarter 1
Develop redirection model and pathways Quarter 2
Development of Bed management standard operating
procedures with roles and responsibilities redefined.
Quarter 1
Refresh of Escalation/OPEL framework and action trigger
cards for acute sites and community.
Quarter 1
Continuous flow moves to support timely placing of admitted
patients.
Quarter 1
Proactive planning by emergency department and bed
management team to support ambulance activity and expected
demand in community through continuous flow.
Quarter 2
Embedding of ambulance escalation process and joint
responsibility for handovers and Scottish Ambulance Service
responsibility for timely handover
Quarter 1
Increase weekend discharges from CAU and Medicine Quarter 1
Scope alternative pathways to support patient centric care at
home i.e., palliative care pathway, Homefirst pathway.
Quarter 2 - Completion Quarter 4
SAFER implementation on both sites to deliver daily MDT board
rounds, supported by a digital solution to capture outcome data.
Phased through both sites over  2025/26
Completion 2026
MDT Whole system LLOS reviews and CTR meetings. Quarter 1
Medical workforce review to drive 7 day board rounds to
optimise discharges and reduce bed occupancy.
Quarter 1 
Allied Health Professionals
- Develop Multidisciplinary Teams and robust care governance
arrangements to enable issue identification, escalation and
resolution;
- Develop practice development tools and techniques  to
support innovation, change and excellence;
- Ensure effective information sharing across systems, to
support positive outcomes for supported people; 
- Develop targeted  responses  to reduce the need for specialist
level interventions; and
- Develop points of access for support, advice and requests for
assistance, including advice lines, physical, digital drop-ins
and clinical.
Completion of acute AHP review and
proposal for change agreed and
enacted by June 2025. 
Digital solution to support data capture
from referral to completion to be scoped
and implemented by late Summer/
Autumn 2025 including development of
an AHP digital dashboard. (Subject to
approval of the Acute AHP review and
subsequent proposal, and subject to
investment outlined in the Digital
Strategy).
Review and develop a whole system
approach to improve patient care and
flow across the acute and community
interface by Winter 2025. 
388

Page 389

7.1 Delayed Discharges 
Shifting the balance of care is an objective for all of our services and for everyone we
support: from childhood to old age. For older people’s services, a key priority that requires
concerted effort is bringing down delayed discharges. A delayed discharge is defined by
NHS Services Scotland as “a hospital inpatient who is clinically ready for discharge from
inpatient hospital care and who continues to occupy a hospital bed beyond the ready for
discharge date”. Reducing delays in discharge from hospital matters for many reasons, but
most importantly it is almost never an appropriate place for someone to be if they no longer
need hospital care. Time spent in hospital when medically fit is an unnecessary risk to health
and welfare, involving risks such as hospital acquired infection and loss of mobility. 
We will continue our focus on bringing down delayed transfers of care, to get people to the
right place for their care needs in Ayrshire and Arran with constant oversight of local
performance. Improvement actions for 2025/26 include the continuation of Weekly Delayed
Transfers of Care (DTOC) meeting, involving all partners in order to ensure services are
allocated to areas of priority. There are a number of working groups looking at double
handed care packages with a view to increasing capacity in a way that is safe for patients
and staff.  Ongoing recruitment with a communications plan in place for recruitment and
retention of care staff. 
Aims/Objectives 2025-2026 (Year 1) KPI
Delayed Discharges
Reduce the daily average number of occupied bed days
due to a delayed discharge.
By March 2026
East Ayrshire - 27
North Ayrshire - 99
South Ayrshire - 92
Delayed Discharges
Reduce the number of people experiencing a delay of any
length or reason in discharge from hospital at the monthly
census point.
By March 2026
East Ayrshire - 33
North Ayrshire - 99
South Ayrshire - 80 
Actions
2025-2026 (Year 1)
By When
East Ayrshire HSCP
• Ensuring a Home First approach across services and
pathways;
• Service-wide implementation of reablement; and
• Implement recommendations from IJB Report on East
Ayrshire Community Hospital. 
March 2026
North Ayrshire HSCP
• Maximise capacity and ensure efficient utilisation of
care at home capacity to support discharge from
hospital including the enhancement of reablement
supports in the community;
• Ensure robust systems are in place for the
management and oversight of complex social work
assessments; and
• Utilise a Homefirst approach and ensure discharge to
assess principles are embedded across Health and
Social Care Teams to ensure good discharge planning
for people leaving hospital. 
March 2026
389

Page 390

South Ayrshire HSCP
• Recruit an additional 40 carers despite the financial
challenges;
• Maintain care home numbers despite the financial
challenges;
• Reduce the number of double handling care packages
to maximise the spread of care at home;
• Maximise the use of step up and step down beds in
RRICU; and
• Further streamline referral and discharge planning
processes for both simple and complex discharges
including guardianships. 
March 2026 
8. Urgent Care 
The new pathways introduced through the Redesign of urgent Care (RUC) programme
delivered by the Ayrshire Urgent Care Service (AUCS) has continued to help attract and
retain the clinical workforce to sustain rotas for the 24/7 urgent care service in NHS Ayrshire
and Arran.  The Flow Navigation Centre (FNC) provides rapid early triage and clinical
assessment of patients to identify the most appropriate pathway for their care which is
provided to people closer to home wherever possible and avoid an acute attendance.  This
includes appointing patients directly to their local Minor Injuries Unit or alternative community
based service. 
Various other pathways are also embedded within AUCS supported by the FNC including a
Call before Convey pathway with Scottish Ambulance Service (SAS). This allows SAS crews
to liaise with a senior clinician in the FNC for supported decision making on alternative care
options to help keep patients within their own home where appropriate.  This pathway works
alongside our professional to professional lines for Care Home and Community Pharmacy
staff to be supported in relation to clinical decision making ensuring the best outcomes for
patients. It also enables patients to be treated/managed within care homes and avoids
unnecessary presentations within the healthcare system and by utilising the Pharmacy First
Scotland pathway.  
The Ayrshire Palliative Urgent Care Service was introduced in June 2024 as part of the
AUCS FNC. This service improves access to District Nursing Services 24/7 for all patients
living in Ayrshire and Arran who are approaching the last few weeks of their life and support
for their families.  Since June, 94% of patients have remained in their preferred place of
care. This model will continue to be developed and embedded within the FNC during
2025/26. 
Aims/Objectives 2025-2026 (Year 1) KPI
Ayrshire Urgent Care Service (AUCS) – at least 85% of
patients who contact AUCS will not require attendance at
the front door and will receive alternative pathways of care
in the right place, at the right time.
85%
Create a virtual capacity network by developing a SPOC
through Ayrshire Urgent Care Service (AUCS) Flow
Seamless pathway to all services for patients.
390

Page 391

Navigation Centre (FNC) to encompass the Hospital at
Home, Community Rapid Respiratory Response (RRR)
programme to ensure a seamless pathway to all services
for patients.
Maintain the FNC community pathways and explore all
opportunities as they arise to enhance the service.
Enhanced FNC Community Pathways
Develop and embed a community nursing based model for
specialist care by supporting palliative patients and families
who are within their last four weeks of life within Ayrshire
and Arran during the Out of Hours period.
A community nursing based model for
specialist care to support palliative patients
and families who are within their last four
weeks of life within Ayrshire and Arran during
the Out of Hours period. 
Actions
2025-2026 (Year 1)
By When
Develop and embed a referral pathway from AUCS FNC to
Hospital at Home Team.
March 2026
Develop a referral pathway from AUCS FNC to RRR
Service.
March 2026
Implement organisational change for RRR and Hospital at
Home operational staff to bring them under the SPOC
model.
March 2026
Scope potential for Ayrshire Community Blood Service
(ACBS) to be encompassed within the SPOC.
March 2026
Maintain and grow AUCS/FNC pathways with Senior
Clinical Decision Maker oversight including appointing to
MIU.
March 2026
Continue to look for reductions in palliative patients being
admitted to hospital who have noted home as their
preferred place of care through ongoing data collection. 
Evaluate responses from patient / family questionnaires to
provide insight into the service and identify any
improvements.
March 2026 
9. Primary and Community Care 
Delivery of safe and effective healthcare provision is a priority for all services to ensure our
citizens can access the right care in the right place at the right time. Relationships with
service providers across the whole of Ayrshire and Arran, including all Primary Care
Independent Contractors, SAS, Mental Health teams and acute services, continues to be
strengthened to ensure provision of priority care. The efficient handling of demand by in-
hours Primary Care services has enabled Urgent Care to be accessible to those with the
most urgent need. 
Delivered by Ayrshire Urgent Care Service (AUCS), delivery of primary urgent care during
the out of hours (OOH) period is a robust well embedded service within NHS Ayrshire and
Arran.  The team continue to utilise and maximise any opportunity to further review and
enhance the service linked to activity and patient outcome data.  AUCS continues to test
new models of delivery using Advanced Nurse Practitioner models and wider MDT services
(e.g. District Nursing, Social Work Services, Emergency Mental Health Crisis Team, and
Advanced Paramedics).  
391

Page 392

A programme for annual review of General Medical Services (GMS) Contracts has been
developed and due to be implemented by the primary care team to review practice operating
models, quality indicators (including chronic disease management) and identify any
improvement work. This will enhance oversight of core service delivery by the Board and
help to early identify any issues or additional support GP Practices may need to sustain
service delivery. 
A project is underway to enable the set-up of the national Community Glaucoma Scheme in
Ayrshire and Arran. This scheme will enable stable Glaucoma patients to be transferred
from acute to community optometry practices for their continued care.  Meetings are taking
place to aid the roll out of the Open Eyes system that will be used to manage the sharing of
patient information from secondary care to primary care providers. The local shared care
scheme for Glaucoma patients will continue to ensure wait times are minimised for stable
glaucoma patients.  We are aiming for a full transition by September 2025.
NHS Pharmacy First Scotland is a national service delivered from community pharmacies
where citizens can access healthcare advice, treatment and/or referral to other healthcare
services without an appointment. The number of consultations by community pharmacy
through Pharmacy First Scotland increases year on year which otherwise would have
occurred in another part of the primary and unscheduled care system.  The addition of
independent prescribers allows pharmacies to offer the Pharmacy First Plus service which
includes assessment and treatment of acute common clinical conditions which is beyond
the scope of the standard Pharmacy First service. 53% of 97 community pharmacies across
Ayrshire and Arran offer this enhanced service which reduces the need for onward referral
of patients to other healthcare providers even further. The pharmacy team are supporting to
train additional pharmacies to become independent prescribers which will facilitate
expansion of the Pharmacy First Plus network supporting more patients access care from
the right professional for their need as close to home as possible.
An Urgent Care Test of Change within Ayrshire Urgent Care Service (AUCS) continues to
be rolled out and evaluated working alongside General Practice. This supports local
practices with home visits between 3.30pm and 5.30pm. This was developed recognising
the impact on access within General Practice when patients present late in the afternoon
with an urgent care need requiring a house visit. Rolled out on a phased basis, this model
now extends to 44 of 53 GP Practices with the aim to extend to all Ayrshire Clusters by April
2025. Feedback from participating practices has been positive reporting that clinicians can
focus on planned appointments without the worry or stress they will be required to attend a
last minute house call.
NHS Ayrshire and Arran were successful in a recent bid to be a Primary Care Phased
Investment Programme (PCPIP) Demonstrator site to work with the Scottish Government
and NHS Health Improvement Scotland (HIS). Having commenced in April 2024,
Demonstrator sites will be supported to work at pace and use improvement methodologies
to fully implement elements of the 2018 GMS Contract, focussing on Pharmacotherapy and
CTAC services locally. It seeks to understand the impacts for people, the workforce and the
healthcare system with the key aims to improve patient outcomes. Data will be collected and
utilised to model full national implementation of priority areas of the GMS 2018 Contract.
Development work will also continue alongside this to further embed MDT teams into
392

Page 393

practice through the GMS Contract, which would continue in tandem with the focussed work
on Pharmacotherapy and CTAC.
An Oral Health Needs Assessment was undertaken by Public Health alongside scoping on
the vision and strategy for dental services across Ayrshire and Arran. A delivery plan will be
presented to NHS Ayrshire and Arran Corporate Management Team for endorsement which
sets out the short, medium and long term goals to improve access to dentistry.  
Oral Health Improvement is a key priority across Ayrshire and Arran. The Oral Health
Improvement Team continue to strengthen links within the community, delivering local
training programmes, educating the population on good oral health practice, with a priority
on prevention and providing support for local groups and events. The team deliver training
and interventions for priority groups following recognised national oral health improvement
programmes such as Childsmile. The OHI programmes are tailored to individual needs of
the population within each of the priority groups. 
Aims/Objectives 2025-2026 (Year 1) KPI
Ensure GMS Enhanced Services meet the needs
of the patient population.
Review, develop and identify priority
enhanced service specifications.
Enhance digital telephony within General Practice and
move to a single resilient digital telephony platform to
enable telephone queuing systems
and increase the number of lines into practices.
All interested practices surveyed and costed
up with 
90% of these practices transferred over onto
the HB system by the end of year 2025-26. =
40 practices complete.
Deliver the Primary Care Phased Investment Programme
(PCPIP) to demonstrate what a model of full
implementation of the MDT can look like, focussing on
CTAC and Pharmacotherapy Services.
Continue to progress actions towards the key
deliverables.  
Further embed and explore all opportunities to expand the
wider MDT roles aligned to the GMS 2018 Contract which
are not included within the Phased Investment
Demonstrator Site programme.
Expansion of the wider MDT roles aligned to
the GMS 2018 Contract.
Improve access to NHS dentistry to ensure a sustainable
and equitable delivery model which supports the oral health
needs of the local population.
Improved access to NHS Dentistry.
Increased shared care, access to service and patient
experience within community Optometry.
Community Glaucoma Service (CGS) and
Juvenile Idiopathic Arthritis (JIA) service to
community optometry implemented within
NHS Ayrshire and Arran. 
Continue to roll out and embed an urgent care pathway for
General Practice to refer patients for clinical care and
treatment during the out of hours period.
Fully deliver the model and embed within
AUCS as Business as Usual. 
Actions
2025-2026 (Year 1)
By When
Embed a programme of annual reviews for GP Practices to
review:
- Practice operating models;
- Quality Indicators; and
- Identify any improvement work
March 2026
Programme of review of Enhanced Services and work with
wider clinical services to ensure joint up approach within
Caring for Ayrshire agenda.
March 2026
393

Page 394

Phased transfer of GP Practices onto new Board platform. 
Digital team to link with line providers to progress timeous
transfer of lines from practices.
40 practices complete by the end of year 2025-
26. 
Primary Care Phased Investment Programme (PCPIP) 
- Expansion/development of the CTAC resilience model
and Pharmacy Support Worker team;
- Continuation and further development of the Primary
Care Practice Educator role;
- Audit of demand and activity to capture reliable, ongoing
data around CTAC activity at both GP practice and
HSCP level;
- Undertake a review of the CTAC skill mix and practice
allocation and define roles in both CTAC and
Pharmacotherapy;
- Ensure standardised processes; 
- Expansion of pharmacy hub; 
- Test of concept/impact - Advanced Pharmacist
Practitioner; and
- Evaluate impact of a preceptorship programme.
End date for programme is December 2025.
NHS Dentistry:-
- Improve access to services with the aim to reduce
waiting times with a specific focus on emergency and
unscheduled care, improving access for people in our
most vulnerable groups through; 
- Support patients to manage their oral health for better
health outcomes;
- Implement priorities and objectives identified from the
programme of work to develop the vision and strategy for
dental services;
- Invest in the development of dental workforce to improve
retention and capacity; and
- Review of current care within practices with the aim to
provide a greater range of services within General Dental
Practices.
March 2026
Community Optometry:-
- Implementation of the Community Glaucoma Service
(CGS) within NHS Ayrshire and Arran; and 
- Roll out the Juvenile Idiopathic Arthritis (JIA) service to
community optometry. 
March 2026 
June 2025
Urgent Care Pathway for General Practice:- 
- Extend the urgent care General Practice model to cover
all GP Clusters across Ayrshire; and
- Extend to a model for pre-bookable appointments at an
AUCS primary care treatment centre following a referral
from General Practice. 
September 2025 
December 2025 
10. Mental Health 
The Mental Health and Wellbeing Strategy MHWBS published in September 2023, sets out
a vision of a Scotland, free from stigma and inequality, where everyone fulfils their right to
achieve the best mental health and wellbeing possible.  Locally we will take a life-course
approach to understanding mental health and will endeavour to develop a programme of
work, with partners, over the coming year to identify and align actions in Ayrshire and Arran
to the national delivery plans.  Also published in September 2023, The Core Mental Health
Quality Standards (CMHQS), sets out the expectations for what services will provide and are
structured around the themes that emerged from engagement with people with lived
394

Page 395

experience of using mental health and psychological services and the workforce.  Along with
the Core Mental Health Quality Standards, 4 service specifications have been published in the
past 24 months and are being implemented across NHS Ayrshire and Arran: 
• National Specification for Psychological Therapies and Interventions;
• National Specification for Eating Disorder Care and treatment in Scotland;
• CAMHS Service Specification; and
• Children and Young People – National Neuro-developmental specification. 
Since the publication of the new strategy and delivery plan in 2023, Mental Health Services
have undertaken a mapping exercise of the existing local priorities and outcomes as set out
in the Ayrshire Mental Health Conversation against the Mental Health and Wellbeing
Strategy Delivery Plan.  We are assured that local priorities and outcomes in place and The
Ayrshire Mental Health Conversation: Priorities and Outcomes (2019 -2027) continue to be
reflective of the three areas of focus and 9 outcomes set out in the Mental Health and
Wellbeing Strategy. 
A Mental Health and Wellbeing Workforce Plan was published in November 2023 in
recognition that delivering on the Mental Health and Wellbeing Strategy can only be
achieved with the right workforce, supported to have the right skills, in the right place at the
right time. As in other service areas, there are significant workforce challenges facing Mental
Health services. The Community Mental Health Team (CMHT) have not seen the same
levels of investment as other Mental Health services in recent years. This has led to a
significant gap in service demand and capacity.  Recognising recruitment challenges for
qualified Mental Health workers (with many posts expected to take up to a year to fill), the
service will consider new advanced/enhanced roles and different ways of working.  In
CAMHS, recruitment challenges are particularly around Psychiatry, Nursing and
Psychology.  The service will continue to look at the skill mix required for the service, based
on these challenges, recruit more Allied Health Professionals (AHP’s) and look at innovative
ways to encourage Psychiatrists to work in Ayrshire. Psychological Services are also
experiencing challenges in recruiting to specific priority posts, including Child and Adult
Mental Health in the Community. Although training places are increasing year on year, there
is currently an insufficient specialist workforce to fill all vacant posts across Scotland so there
is currently a competitive workforce context. 
Within 2025-26 we continue work to ensure the mental health built estate enables the
delivery of high quality, person centred and safe care, with a focus on implementing the
national Mental Health Built Environment Quality and Safety toolkit.  In addition to work on
the building toolkit, we continue to utilise the Scottish Government infrastructure budget to
support digital pilots. The newly refurbished West Road CAMHS/CEDS unit will launch early
in 2025 following circa £600k investment and we plan to refurbish Kilne Walk in Irvine for
our Perinatal Mental Health service. Early stage improvement work is being assessed for
Ward 7a at Woodland View and the Mental Health Assessment Hub opened in 2024 all with
infrastructure investment.   
10.1 CAMHS 
395

Page 396

Within Ayrshire and Arran, CAMHS services are provided by multi-disciplinary teams that
provide assessment and treatment/interventions in the context of emotional, developmental,
environmental and social factors for children and young people experiencing mental health
problems. This is provided through three distinct teams to ensure that children and young
people are on the correct pathway at a much earlier stage: Specialist Community CAMHS
(SCAMHS), CAMHS Urgent Assessment and Intensive Treatment (CUAIT) and
Neurodiverse CAMHS (N-CAMHS). 
Whilst transforming and developing our services we will continue to learn from children,
young people, families and Carers with ‘Lived Experience’ of the service and continue to
work to gain feedback through KIDSCREEN which is a health related quality of life
questionnaire for children, young people and their parents. 
Within 2025/26 CAMHS will continue to work towards the waiting time targets set out in the
CAMHS NHS Scotland National Service Specification. Already CAMHS has met the 4-week
first appointment response time in alignment with the national specification through a
redesign of the service and implementation of the three pathways and by fully implementing
the revised service access criteria of accepting only those referrals where there are
underlying mental health needs in alignment with the national specification. This has
enabled meaningful redirection of referrals to wider whole system supports and services to
more appropriately meet the needs of children and young people who do not have an
underlying mental health condition. Focus is now on providing interventions and treatments,
where required and agreed with children, young people and families/carers, as soon as
possible, and no later than 18 weeks from first referral, with the median experienced wait for
treatment being no longer than 12 weeks.   
Within 2024/25 NHS Ayrshire and Arran worked in partnership with North Ayrshire Council
to create a specialist centre for CAMHS, as well as the all-age Community Eating Disorder
Service (CEDS) in Ayrshire and Arran.  With building works completed in 2025, the centre
at West Road, Irvine will aim to change the way the residents of Ayrshire and Arran access
and receive mental health care.  It will also provide a base for outpatient services for the
CEDS and Neuro-CAMHS team.   
In addition, we will continue to work with our IT systems and through a programme of wider
transformation linked to the Mental Health Digital Transformation Board, will endeavour to
develop effective data collection systems that provide robust data and reports to inform
service improvement, redesign and monitoring of performance. This will also prepare the
service for reporting on delivery of the forthcoming Mental Health Standards.  
Aims/Objectives 2025-2026 (Year 1) KPI
Improve access to mental health service and build
capacity and sustainable delivery to maintain the CAMHS
18 week RTT and work towards the 4 week target within
National Specification.
18 week RTT and 4 week SG Target 
Improve service delivery and resilience with the
recruitment and retention to CAMHS workforce.
% staff retention in key disciplines 
Improving mental health environment and patient safety. Feedback from young people, parents/carers
through QR codes to Microsoft
questionnaires, Care Opinion and verbal
feedback through CAMHS Participation
Officer.
396

Page 397

CAMHS will continue to learn from children, young
people, families and Carers with ‘Lived Experience’ of the
service.
Feedback from young people, parents/carers
through QR codes to Microsoft
questionnaires, Care Opinion and verbal
feedback through CAMHS Participation
Officer.
N-CAMHS will continue to see young people who are
currently on the N-CAMHS waiting list. 
The N-CAMHS waiting list will be reduced and
young people will be seen more timeously. 
Actions
2025-2026 (Year 1)
By When
Using Trakcare and CAMHS Benson Wintere DCAQ
Model to identify ways to meet the additional contact at 4
weeks.
March 2026
Further develop and expand on the skill mix of the
workforce in particular encouraging Psychiatry and
Psychology posts to CAMHS.
March 2026
CAMHS business case will have been developed for
CAMHS Inpatient beds in Ayrshire on the Woodland View
Site.  Recent communications regarding capital spend
whilst remaining a key objective will result in a delay,
whilst potential funding streams are sourced.
Start discussions for Inpatient facility 2025/26
Access qualitative feedback through Kidscreen as well as
quantitative data.
Ongoing
Commission external providers to assess children and
young people.
March 2026 
10.2 Psychological Therapies 
The latest published data, November 2024, indicates that compliance for Psychological
Therapies (92.8%) remains higher than the Scotland average. Developments over the next
12 months will address the requirements and standards dictated by the Psychological
Therapies Service Specification with a specific program of work, linked to Scottish
Government timescales, for implementation. 
The Self-Assessment tool to consider compliance with the Psychological Therapies Service
Specification will be available from January 2025. Some parts of Psychological Services
have already started with mapping their service delivery against the service specification
and improvement work is underway. This work is led by the Senior Psychology Leadership
team and will involve cross discipline and specialty engagement to ensure adequate
outcomes. Dedicated clinical governance routes have now been established with the start
of the Psychological Therapies and Interventions Clinical Governance Group and the
Psychological Services Clinical Governance Group. Both groups are chaired by the Director
of Psychological services. 
Patient centred areas of focus will continue to address issues of longest waits, matched-
stepped care within services for children and young people, neurodevelopmental service
provision (both Children and Adults) and whole board alignment to the updated Matrix
Treatment Recommendation for Psychological Therapies (2023) and the implementation of
the National Specification for the delivery of Psychological Therapies and Interventions
(Scottish Government, September 2023). This will sit alongside continued work in ensuring
a Trauma informed approach is embedded within all directorates of the organisation.
397

Page 398

Working with partners in acute/ neurological services to increase workforce capacity of the
psychological therapy provision is a key objective. Specific gaps in Cancer Care and Stroke
need to be considered as a priority. 
Ayrshire and Arran has been successful in obtaining funding to be a pilot site for Early
Intervention in Psychosis. Recruitment is underway and establishment of Early Intervention
in Psychosis service is planned for Quarter 1 2025/26. 
Risks over the coming financial year are the reduction in Scottish Government funding
streams and savings targets. Reduction of these streams of funding risks a significant impact
on core mental health services. The lack of allocation to Primary Care funding also adversely
impacts on demands upon secondary care and our ability to meet waiting times targets. 
Implementation of the National Specifications relating to children and young people with
neurodevelopmental conditions, and the Community Wellbeing Framework for Children and
Young people, are considered important to specialist secondary mental health services
being able to meet waiting times targets. These specifications sit outside specialist mental
health, but any failure will directly affect the pressures upon our service. Recent work within
the areas of Child and Adult Neurodevelopmental Assessment has concluded that
development of sustainable assessment services will necessitate specific, additional funding
requests to meet the increasing demand for neurodevelopmental condition assessment and
treatment. 
Aims/Objectives 2025-2026 (Year 1) KPI
Improve overall 18 week RTT to consistently comply with
standard across all specialisms.
RTT 92% 
Implementation of Psychological Therapies and Interventions
(PT&I) Standards.
Psychological Therapies and Interventions
(PT&I) Standards implementation
Improve service delivery and resilience with the recruitment
and retention of Psychological workforce.
Improved service delivery and resilience 
Actions
2025-2026 (Year 1)
By When
RTT
- Detailed Trajectory work in different specialisms - DCAQ; 
- Further analysis and formulation of data to create better
understanding of reasons behind access in struggling
specialisms; and
- Redesign of service delivery model where needed.
March 2026
- Assessment Tool for PT Spec implementation will be
rolled out. 
- Assessment to commence for all Psychological Therapy
specialties/teams. 
- Engagement with wider services delivering
Psychological therapies needed.
September 2025 
- Through data and trajectory analysis gain more clarity on
workforce gaps and skill mix/safe staffing levels; and
- Develop workforce plan for overall service.
March 2026 
10.3 Community Mental Health Services 
398

Page 399

Adult Community Mental Health Services are devolved in Ayrshire and Arran to their
respective Health and Social Care Partnerships (HSCP).  Although they might work and look
slightly different in each area, the fundamental service delivery is the same.  As such the
following aims/ objectives have been agreed collectively by all three HSCP’s.  
Aims/Objectives 2025-2026 (Year 1) KPI
To implement the Core Mental Health Standards into Adult
Community Mental Health services.
Implementation of the Core Mental Health
Standards
To ensure that individuals have access to mental health
services within primary care in order to ensure we are
supporting prevention and early intervention agenda.
Access to mental health services within
primary care.
Ensure service delivery aligns to and contributes towards
national strategies relating to mental health.
When needed, provide complex or specialist treatment
quickly, effectively and to the highest standard.  
Minimise average (median) wait for initial
assessment (Community Mental Health
Team). 
Maximise % of people subject to Mental
Health Act supported via care programme. 
Actions
2025-2026 (Year 1)
By When
Benchmark current service against Core Mental Health
Standards.  
Identify gaps in attainment, what controls and supports are
required to attain them.  
Seek appropriate help to attain controls and supports
required.  
Re-evaluate impact and efficiency of implementation.  
March 2026
Deliver the integration of the primary care mental health
workforce into wider primary care multi-disciplinary teams
and community and secondary care.
March 2026 
10.4 Unscheduled Care 
The Unscheduled Care Mental Health Service is delivered Pan Ayrshire, managed
operationally by the North Ayrshire HSCP.  The service has seen many developments and
opportunities for growth over the past number of years.  The main aim is to embed service
changes, and this year to ensure local delivery is in attainment or excel of national standards. 
Aims/Objectives 2025-2026 (Year 1) KPI
Reviewing local Psychiatric Emergency Plans to align them
to the national template.
Alignment of local Psychiatric Emergency
Plans to national template. 
Actions
2025-2026 (Year 1)
By When
Psychiatric Emergency Plans
- Identify national template;
- Benchmark local planning against national template;
- Identify gaps and adaptations required of local plan; and
- Update and ensure appropriate engagement with
stakeholders.
March 2026
399

Page 400

10.5 In Patient 
Within the Mental Health Inpatient Service key priorities for 2025/26 will be to improve patient
flow, reduce the average length of stay and number/duration of delayed discharges. 
To support these improvements and deliver a more coherent system of forensic mental health
services, we will work to: 
• Improve referral pathways and increase expectation of ‘pace’/throughput; 
• Implement more robust bed projection processes; 
• Continue to develop relationships with the West of Scotland Forensic Network, being part
of wider bed capacity solutions; 
• Continue to review impact of recently opened Unscheduled Care Assessment Hub and
opportunities for Adult Mental Health Admission wards;
• Review persons subject to unplanned (UNPACs) placement and repatriate locally as
clinically appropriate; 
• Seek support to develop a Data Dashboard to provide robust data on service performance
against key measures to inform service delivery and improvement; and 
• Utilise the new Band 4 Assistant Practitioners to enhance service delivery, reducing
supplementary staffing spend. 
Aims/Objectives 2025-2026 (Year 1) KPI
Improve patient flow by reducing ALOS from Q1
Baseline. 
By March 2026  
Average Length of Stay 
AMH Acute = tbc days
EMH Acute = tbc days
Improve patient flow by reducing duration of delayed
discharges from Q1 Baseline. 
By March 2026  
Delayed Discharges
AMH Days = 
EMH Acute days = 
Deliver a more effective system of Forensic Inpatient
Services. .
Referral Pathways agreed/implemented. 
Ongoing participation in West of Scotland
Forensic Network meetings. 
Increased scrutiny around UNPACs referrals
to exhaust all local solutions. 
Themed analysis of persons subject to
UNPACs to consider generation of local
options. 
Reduce supplementary staffing spend. Q3 – reduction of 5%
Q4 – further 5% reduction 
Actions
2025-2026 (Year 1)
By When
Reducing LOS March 2026
400

Page 401

Robust bed management processes including use of
traffic light system to monitor progress against PDD. 
Analyse impact on admission patterns of unscheduled
care assessment hub opening and activity for AMH Acute
beds. 
Reducing Duration of Delayed Discharges
Monitoring/escalation of delayed discharges via Discharge
Liaison Groups. 
Participate in HIS supported workstream to review
Delayed Discharges and identify improvement actions. 
Ongoing 
Initial engagement September 2024. Scoping
programme currently with expectation of
recommendations April 2026.
Forensic Inpatient Services
Generate and implement referral pathways to increase
‘pace’/throughput. 
More robust bed projection processes. 
Continue to develop relationships with WoS Forensic
Network, part of wider bed capacity solutions. 
Look to repatriate persons on UNPACs placement as soon
as possible.
March 2026
Reduction of use of supplementary registered staff from
Q3 2025/26 on Band 4 APs taking up post. 
March 2026 
10.6 Alcohol and Drug Service 
NHS Ayrshire and Arran work with partners to support the National Mission on Drugs to
reduce drug related deaths and improve lives.  Priority areas include the implementation of
Medication Assisted Treatment (MAT) Standards, delivery of the treatment target and
increasing access to residential rehabilitation. 
Services will prioritise the delivery of the MAT standards by implementing their local
improvement plans with the support of the national MAT support team (MIST).  Whilst
reviewing and improving MAT access through established community alcohol and drug
services, the additional focus over the next 3 years will be on implementing actions to
support MAT access through wider settings e.g. primary care, prison and police custody.  
A specific challenge in implementing and embedding MAT within primary care is the
absence of recurring funding.  Discussions continue with colleagues across primary care,
finance, the Health Board, Health and Social Care Partnerships (HSCP’s) and Alcohol and
Drug Partnerships (ADP’s) to highlight the funding challenges and explore ways to continue
to resource this work.
Services will continue to offer an ‘open’ referral process and be flexible in their approach to
meet the ongoing national ‘Access to treatment’ waiting time’s standards.  The promotion of
Alcohol Brief Interventions will continue across core and wider settings.  We will work with
our partners to implement additional measures to reduce both drug and alcohol related
deaths.  Increased support will be available to individuals following a Non-Fatal Overdose,
local ADP drug related death prevention strategies will be implemented, improved pathways
401

Page 402

of support will be available to better support individuals with co-occurring mental health and
drug and/or alcohol use (with updated guidance being available for staff) and Naloxone
related training and supply will be prioritised.
In March 2022, the Minister for Drug Policy set a new ‘substance use’ treatment target to
increase the numbers of individuals accessing treatment support by April 2024.  Pathways
and processes are in place to offer quick access to treatment including having an ‘open’
referral system and supporting more individuals into treatment via MAT interventions.  In
terms of a future target, post April 2024, services are awaiting new information whilst advice
has been sought from the Minister.
Individuals from across Ayrshire and Arran will continue to be supported, as required, to
access local hospital based detoxification and rehabilitation support via Ward 5, Irvine. 
Families will be prioritised for support via access to the national family support facility
(Harper House) based in North Ayrshire, who provide safe, structured support for the whole
family to address their problematic drug and/or alcohol use, improve their mental health and
quality of life.  Individuals will also be supported to access external residential rehabilitation,
however, due to current demand, the challenge will be securing sufficient funding from local
ADP’s and/or the Scottish Government.   
Aims/Objectives 2025-2026 (Year 1) KPI
Consistently deliver safe, accessible, high quality drug
treatment across Ayrshire and Arran.
Sustain delivery of MAT Standards
Meet national 'access to treatment' Waiting Times
Standards of 90% of individuals to commence treatment
within 3 weeks of referral and 100% within 6 weeks.
Treatment Waiting Times Standard
90% within 3 weeks
North Ayrshire – 90%
South Ayrshire – 90%
East Ayrshire – 90% 
100% within 6 weeks
North Ayrshire – 100%
South Ayrshire – 100%
East Ayrshire – 100%
Ensure naloxone remains a priority and is accessible for
those who most need it.
Minimum kits will be supplied by March
2026
North Ayrshire - 480 kits 
East Ayrshire - 330 kits
South Ayrshire - 350 kits 
Build upon the residential rehabilitation pathways for
individuals from pre rehabilitation, during and post
rehabilitation.
Review and improve on current Residential
Rehabilitation Pathway and Integrate use of
the Scotland Excel rehabilitation provider
framework into the pathway. 
Actions
2025-2026 (Year 1)
By When
North Ayrshire 
Benchmark current provision to support individuals
seeking help for stimulant and benzodiazepine use.
Work with partners to identify gaps and improvements,
implement agreed actions and evaluate.
March 2026
North Ayrshire  March 2026
402

Page 403

Implement local Naloxone action plan, offering Naloxone
training, raising awareness and promoting use of Naloxone.
Supply a minimum of 480 Naloxone kits (and emergency
life-saving intervention).
North Ayrshire
Continue to implement pathways of support into, during
and after residential rehabilitation through the co-
ordination and support of a Single Point of Contact
(SPoC) and Recovery Development Workers (RDW) -
peer workers.
March 2026
East Ayrshire 
An increase in ANP/ Clinical Nurse Specialist and
Specialist GP in our rural cluster areas to improve access
at a primary care level.
March 2026
East Ayrshire 
Via the Multi agency Residential Rehabilitation Working
Group, develop and implement the Residential
Rehabilitation pathway which is clear, consistent and easy
to navigate from pre rehabilitation to post rehabilitation
stage.
March 2026
East Ayrshire
Rapid Access to Drug and Alcohol Recovery Service will
work with HMP Kilmarnock Healthcare to implement a
process to enable individuals who are East Ayrshire
residents and are prescribed Opiate Replacement
Therapy to be provided with a "Safe Talk" via Near Me.
March 2026
East Ayrshire
Implement the use of Near Me technology for planned
liberations from HMP Kilmarnock for individuals who are
prescribed Opiate Replacement Therapy.
March 2026
East Ayrshire 
Deliver a Recovery Oriented System of Care for drugs and
alcohol via the Alcohol and Drugs Partnership Strategic
Plan.
March 2026 
South Ayrshire 
Test of change (TOC) in South Ayrshire to demonstrate
proof of concept for a model to deliver on MAT 7. 
TOC will be evaluated in 2026, for any further
developments or improvements. 
10.7 Learning Disabilities 
Learning Disability Services are delivered within each of the Health and Social Care
Partnerships, with North Ayrshire HSCP taking the lead in relation to some elements of
shared delivery, specifically the Assessment and Treatment facility delivered in Ward 7A
Woodland View.  The model of delivery within Ward 7A has already undergone review in
recent years, with the result that the number of beds available within the ward have been
scaled back in order to create a better care environment.  Despite these positive changes,
issues within the ward, compounded by the ongoing problem of delayed discharge linked to
limited availability of appropriate community supports, have created an urgent need to again
look closely at its model.  This is being done with a view to informing possible changes, and
the work is being led by North Ayrshire HSCP.  The need for this work is further highlighted
by the publication of reports by the Scottish Human Rights Commission (2025), and by the
Mental Welfare Commission (2025), regarding the situation regarding delayed discharges
across Scotland, and the lack of progress nationally in relation to meaningful delivery of
human rights informed in this regard. 
403

Page 404

This national focus on hospital admissions is complemented by a national focus on more
preventative activity, ideally delivered within Primary Care, namely Annual Health Checks. 
Implementation of the Scottish Government’s new specification regarding Annual Health
Checks for people with learning disabilities has been progressing at pace within Ayrshire. 
This work has benefited to a large degree from the pre-existing work around the
establishment of GP Registers of people with learning disabilities, linked to a previous
Enhanced Service specification.  While a great amount of positive work has been
undertaken regarding delivery of the new Health Checks, there remains an awareness of
the need to learn from their delivery, and that of the Learning Disability Health Checks which
preceded them, with a view to informing future activity.  To a large degree, this reflects
findings of note identified in initial delivery of the new checks in North Ayrshire, including the
large number of individuals for whom the check identified no required actions (over those
already in place).   
In their ideal form, the Annual Health Checks represent an opportunity to support
mainstream and other services in meeting their obligations regarding the care and inclusion
of people with learning disabilities.  While much evidence already exists regarding the needs
of people with learning disabilities, and how services can best respond to these,
understanding this from a local context remains a necessary activity.  With this in mind, the
North Ayrshire Learning Disability Service has commenced a collaboration with the Local
Information Support Team from Public Health Scotland, with a view to understanding the
service use and health needs of the local known learning disability population; how this might
differ the general population; and what this suggests about relevant service responses. 
While this work has started with a focus on North Ayrshire, the hope is that LD Services in
East and South Ayrshire will also become involved.  
Aims/Objectives 2025-2026 (Year 1) KPI
Continue delivery of Annual Health Check under new
specification, and identification of learning and innovation
opportunities linked to this and pre-existing experience of
delivery of enhanced primary care services to people with
learning disabilities across Ayrshire.
Delivery of report on 2025-26 activity and
identification of development plans for
coming years.
Building on work to date, review provision of care and built
environment within Ward 7A, with a view to identifying
necessary development work for enhanced or alternative
provision.
Deliver relevant change in model of inpatient
delivery. 
Further develop collaboration with Public Health Scotland
(Local Information Support Team) as part of a broader
programme of learning and co-design within the service,
with a view to annual delivery of reporting.
Annual delivery of reporting. 
Actions
2025-2026 (Year 1)
By When
Develop an overarching understanding of activity and
associated outcomes linked to delivery of the new Health
Checks in each Ayrshire authority.
April 2026
Benchmark against provision elsewhere in Scotland;
review admissions to date and associated learning e.g.
around admission avoidance; explore workforce
requirements, informed by recruitment to date and use of
Bank Staff; review delayed discharges to date and
implications.
July 2025
404

Page 405

Continue to link regularly with PHS colleagues and ensure
appropriate use of learning data, as well as ensuring that
the LIST team stay informed about and involved in the
ongoing learning and improvement work.
Ongoing 
11. Healthcare in Custody 
In 2023 the Scottish Government established a Short Life Strategic Leadership group to
drive meaningful improvement to prison health care. This identified three priority areas with
one of these being to develop a Target Operating Model (TOM) for healthcare service
delivery. The National Prison Care Network has been asked to lead on the development of
a TOM. The aim of this work is to provide a framework for nationally consistent model for
healthcare delivery in prisons alongside tangible change ideas to deliver this. A TOM has
been developed with 9 domains identified. Baseline information has been recorded with a
plan for 6 monthly updates of progress made that is shared in a data dashboard. Areas of
work have been identified with the HMP Kilmarnock healthcare leading on national work in
relation to the prison admissions process.
Drug misuse treatment and reducing drugs deaths continue to be a priority for service
improvement. Nationally the MIST team are co-ordinating work on the delivery of MAT
standards in custodial settings with a prison toolkit being finalised. Reporting on progress of
MAT standards in custodial settings will commence in 2025.
Improvement work for prison healthcare is in the context of some particular service
pressures following HMP Kilmarnock moving from SERCO the private provider to the
Scottish Prison Service in March 2024. Principally these are in relation to an 18% increase
in the prison population and changes to the prison regime which have an impact on clinical
service delivery.
Aims/Objectives 2025-2026 (Year 1) KPI
Further progress implementation of Medication Assisted
Treatment (MAT) standards working with the national MIST
(MAT implementation Support Team) to embed practice
improvement in prison setting and develop improvement
areas in Police Custody.
Implementation of Medication Assisted
Treatment (MAT) standards in Prison and
Police Custody.
Progress service improvement in priority areas identified by
the Target Operating Model under the oversight of the
National Prison Care Network (NPrCN). Particular focus on
prison admission process where development is being led by
HMP Kilmarnock healthcare.
Implementation of service improvement in
priority areas identified by the Target
Operating Model. 
Actions
2025-2026 (Year 1)
By When
MAT Implementation
• Benchmark HMP Kilmarnock practice against Prison
Toolkit which is anticipated to be finalised in March 2025;
• Develop recommendations from review of staff training
and support needs in relation to MAT 6 & 10; 
• Recruitment of Psychology post;
March 2026
405

Page 406

• Complete framework for range of evidenced interventions
to be delivered by mental health MDT and addiction
team; and
• Explore improvement areas that be delivered by existing
on-call FME healthcare model. 
Target Operating Model 
• Six monthly (April / October) reporting into National
Prison Care Network (NPrCN) on progress of
improvement areas;
• Agree revised model focussing on immediate risk and
need on day of admission and follow up appointments for
holistic assessment of healthcare need;
• Build new admission process on Vision; 
• Test revised model; and
• Undertake evaluation of revised model with focus on
evidence of improved outcomes and areas of model that
may require adaptation. 
March 2026 
12. Pharmacy 
The priorities for the pharmacy directorate in 2025/26 are to support our key areas of risk,
cancer services including aseptic dispensing; to deliver the objectives of the Primary Care
Phased Investment Programme (PCPIP); to support acute services to optimise patient flow
and minimise delays to discharge; and to work collaboratively with regional colleagues on
developing and implementing a Regional Medicines Formulary and joint priorities to support
clinical pharmacy services using Hospital Electronic Prescribing and Medicines
Administration system (HEPMA).  Focussing on digital solutions to support clinical pharmacy
service delivery will lead to movement of the workforce away from tasks that can be
automated to more complex roles such as polypharmacy reviews and long term condition
management.
Where additional workforce is required this is dependent on available funding and available
workforce. Limited pipeline of pharmacists via the Foundation Training Year Trainee
Pharmacist programme and lack of pipeline of Pre-registration Pharmacy Technician
Trainees are key risks to recruitment to support the additional workforce required to deliver
safe care to patients in high care areas, cancer services and to deliver pharmacy services
across 7 days.  Uncertainty regarding ongoing funding of workforce recruited to the PCPIP
is also a risk to delivery of the programme and, subsequently, fuller implementation of
pharmacotherapy. 
Aims/Objectives 2025-2026 (Year 1) KPI
Work with colleagues in the West of Scotland to develop a
Regional Formulary process and implement a Regional
Formulary.
The development of a Regional Formulary
process and implementation of a Regional
Formulary.
Deliver the pharmacotherapy elements of the PCPIP
demonstrator site programme.
PCPIP demonstrator site programme
pharmacotherapy elements delivered.
Scope the redesign and delivery of 7 day clinical pharmacy
services to critical & high care areas to improve compliance
with national standards for clinical pharmacy services and
contribute to reducing length of stay. 
Deliver a 7 day clinical pharmacy services
to critical & high care areas.
406

Page 407

Scope the expansion and delivery of the current 7 day
operational pharmacy service to provide an equitable service
across the full week.
Equitable pharmacy service across the full
week.
Work with colleagues across NHS Scotland THBs to
implement, maintain and develop the Pharmacy Early
Warning (PhEW) score to ensure patients are prioritised
appropriately for clinical pharmacy review.
Implement, maintain and develop the
Pharmacy Early Warning (PhEW) score.
In line with Scottish Cancer Action Plan 2023-26, ensure
available pharmacy infrastructure, capacity and workforce to
ensure that SACT medicines are available to people with
cancer.
SACT medicines are available to people
with cancer. 
Actions
2025-2026 (Year 1)
By When
Regional Formulary process
- Project working group to be convened; 
- Key project personnel to be recruited;
- Governance processes to be developed, agreed by
ADTCs and implemented;             
- Board Formulary processes to be stood down; and
- Regional Formulary Governance structure to be
implemented following approval by Board ADTCs.
March 2026
PCPIP demonstrator site programme
- Expand pharmacy support worker role in delivery of
service;
- Clearly define roles of each member of the team- right
person, right task;
- Expand pharmacy hubs - skill mix and resilience;           
- Develop a supervision/ preceptorship programme to
improve pharmacists confidence in clinical decision
making and risk management; and  
- Test and evaluate Advanced Pharmacist Practitioner role.
March 2026
7 day clinical pharmacy services critical and high care
areas
- Identify clinical areas where 7 day clinical pharmacy
service is required; 
- Design service specification, define roles and scope
workforce required to deliver ensuring right person right
task;
- Secure funding to recruit workforce; 
- Address any contractual changes required; and
- Implement training programme to ensure appropriate
skillmix and resilience for service delivery over 7 days.
March 2026
7 day operational pharmacy service
- Agree the operational areas that require to be covered at
weekends; 
- Scope the workforce required to deliver the service
robustly; and
- Ensure appropriate skills mix and secure funding to recruit
additional workforce to deliver this service.
March 2026
Pharmacy Early Warning (PhEW) score
- Implement PhEW tool to all WoS boards; 
- Identify boards out with WoS wishing to adopt PhEW;
- Provide clinical and digital pharmacy support to adopting
boards to ensure successful implementation;  
- Establish SLA with participating boards; 
- Embed governance process for maintenance and
validation of PhEW score; and 
March 2026
407

Page 408

- Scope clinical specialties that would benefit from bespoke
PhEW score, develop modified PhEW score for identified
clinical specialties.
Scottish Cancer Action Plan 2023-26
- Review Cancer Forward-Look reports to anticipate growth
in SACT provision;
- Complete capacity planning exercises for aseptic and
dispensary areas to ensure appropriate capacity for
growth;
- Implement SACT Dispensing Hub to ensure capacity,
dedicated workforce and appropriate procedures for safe
dispensing of SACT;
- Complete workforce review to inform recruitment, training
and allocation;
- Regularly evaluate provision of SACT services, workforce
and capacity; and
- Implement training programme to ensure appropriate skill
mix and resilience for service delivery.
March 2026 
13. Infrastructure 
Scottish Government issued a Director’s Letter (DL) to all NHS Boards outlining the
requirements for all NHS Boards to prepare a whole-system infrastructure plan.  Since
receiving this, efforts were renewed on the whole-system Programme Initial Agreement
(PIA) document. 
Work was restarted and has been repositioned to reflect the impact of the pandemic and the
reform narrative will form the whole-system PIA, our plan is to become operationally and
financially sustainable through significant reform. This version builds upon the original PIA
while incorporating the specific details requested in the DL letter.
Scottish Government indicated in the DL that the PIA should be submitted by NHS Boards
in January 2026 however, given the substantial progress made, NHS Ayrshire and Arran
intends to submit this PIA document in draft in January 2025, aligning with the submission
of the Business Continuity Plan. At this stage, we do not anticipate formal feedback on the
PIA but rather seek a discussion with Scottish Government on its content and the proposed
direction of travel.
The whole-system PIA narrative will empower us to focus on engaging our stakeholders,
communities, staff and services in the essential work now needed to take service reform
and redesign to the next level.  To deliver on our Caring for Ayrshire ambition, it is crucial
that we elevate our engagement with stakeholders, to actively listen and learn from their
experiences and perspectives. Our commitment to effectively engage with citizens,
communities, and staff is paramount. We therefore propose a comprehensive approach,
involving widespread stakeholder engagement using co-production methodologies to
redesign care models with a ‘whole system’ perspective.  We will maintain open and
transparent communication and engagement with both internal and external stakeholders,
as well as our citizens, to inform and shape the programme.
A dedicated engagement and communications group will provide advice, support and
guidance on all associated stakeholder engagement activity aligned to the Caring for
Ayrshire ambition. Engagement and communication will be embedded throughout work
408

Page 409

streams and plans, to provide clarity, guidance and consistency for those leading on the
high impact changes.
The Board’s Business Continuity Plan (BCP) was submitted to Scottish Government in
January 2025 and confirmation of what funding will be provided is expected by end of March
2025. The Board’s submission plans for an additional £12.2m of funding for FY25-26 with
main areas of expenditure targeting:
• Improved accommodation for Critical Care and Oncology at UHC;
• Purchase of and improvement works to several GP Premises;
• Backlog Maintenance Work; and
• Investment in digital and medical equipment.
What will be able to be delivered will be dependent upon the final funding allocation provided
by Scottish Government.
Sustainability and Net Zero investment will be reflected through investment in building
infrastructure.
Aims/Objectives 2025-2026 (Year 1) KPI
Ensure that sustainability and net zero aspirations are
embedded within brief requirements for major
developments and comprehensive refurbishments.
March 2026
Improve utilisation of accommodation to support the
reduction in energy use.
March 2026 
Actions
2025-2026 (Year 1)
By When
Distributed Working and Estates Rationalisation.  TBC
Completion of Lister Street Distributed working Hub.  31 March 2025
Consolidate non clinical offices within Ailsa Main Building
facilitating exit from Eglinton, Greenan and Stair Buildings. 
TBC (Except Eglinton Meeting Room 1)
TBC (Including Eglinton Meeting Room 1)
Exit from Afton House.  
Demolition of Arrol Park Houses 4 to 9. 30 April 2025
Demolition of Lochranza ward, Ailsa. TBC
Demolition of Eglinton Greenan and Stair Building. TBC
Demolition of Afton House, Ailsa. TBC
Commence design and procurement work for wind turbine
UHA.
30 April 2025 (Subject to BCP funding) 
14. Community Wealth Building / Anchor 
NHS Ayrshire and Arran has developed an Anchor/Community Wealth Building (CWB)
Strategy to harness our power as an anchor institution and to positively impact health, social,
economic and environmental outcomes in Ayrshire and Arran. NHS Ayrshire and Arran’s
Anchor / Community Wealth Building (CWB) Strategy 2023-26 sets out the Board’s plans to
deliver on the anchor organisation ambitions alongside our anchor partners in the Ayrshire
409

Page 410

Community Wealth Building Commission and in support of the Ayrshire Regional Economic
Strategy and the Ayrshire Growth Deal. 
The strategy sets out the Board’s ambition to support creation of a fair local wellbeing
economy which enhances local wealth, reduces poverty and inequality through investing
and spending locally, creating fair and meaningful employment, designing and managing
our buildings, land and assets to maximise local and community benefits and reduce our
environmental impact. 
Tackling Ayrshire’s social and economic inequalities will not be easy. Poverty rates in
Ayrshire and Arran are higher than the Scottish average, Ayrshire’s workforce has fewer
qualifications, and it is forecast to experience less economic growth and greater reductions
in workforce in the short and medium-term. Given these stark economic inequalities, if
Ayrshire’s health inequalities are to be reduced, strategies must tackle the ‘fundamental
causes’ driving inequality. This requires a joined-up approach, bringing together local
partners to tackle inequality and to maintain a long-term vision of developing a local Ayrshire
wellbeing economy.  
Our Anchor/CWB programme is governed by the Community Wealth Building Programme
Board which meets quarterly. Our Anchor/CWB Programme focuses on the six pillars of
Community Wealth Building (Fair Work/ Workforce; Procurement; Land and Assets;
Financial Powers; Service/ Plural Diverse Ownership and Climate Change) with leads
appointed for each pillar.
The Anchor/CWB Year 2 Annual Report was presented to the NHS Board in October 2024.
The report provided assurance that progress has been made to deliver on NHS Ayrshire
and Arran Anchor/Community Wealth Building (CWB) Strategy in line with requirements of
the NHSScotland Annual Delivery Plan 2024. The report shared progress to-date on building
our Anchor/CWB programme demonstrating some of the work carried out during year 2 of
the programme. A Year 3 plan has been drafted and will be presented through governance
in Quarter 4 2024/25 for approval. 
The Community Wealth Building Programme Board will continue to progress workstreams
set out in our Anchor/CWB Strategy 2023-2026 and to deliver the actions set out in the
accompanying Year 3 plans. 
Aims/Objectives 2025-2026 (Year 1) KPI
Continue to lead on capacity building, building the
evidence base, supporting ongoing improvement, and
awareness raising of Anchors workstream and align work
with wider Community Wealth Building agenda, and as a
Board, support the redirection of wealth back into local
communities to help address the wider determinants of
health inequalities, by progressing specific, measurable
objectives that align with their Anchor Strategic Plan.
Delivery of the Anchor Strategic Plan 2023-
26 
Actions
2025-2026 (Year 1)
By When
Complete refresh of Community Wealth Building Strategy. June 2025 
410

Page 411

Meet with pillar leads to develop in year actions (2025-
2026).
June 2025 
Agree sign off at CWB Programme Board of in year
actions.
June 2025 
Complete SG Anchor Metrics Return for FY 23/24. June 2025 
Pillar leads to progress in year actions and report
implementation to CWB Programme Board.
September 2025
Pillar leads to continue to implement in year actions and
report progress to CWB Programme Board.
September 2025
Prepare yearly report to reflect progress on in year
actions.
March 2026 
15. Workforce 
Further detail on our workforce positon will be submitted in accordance with the
requirements of Directors Letter on workforce planning and in addition, some detail is and
will continue to be provided via the NHS Scotland Financial Delivery Unit 15 box grid
quarterly self-assessment returns.
Strategically the Board continues to have strategic workforce risks in relation to clinical
registrant supply and capacity, with a distinct medical staffing supply and capacity risk being
established this year, both being very high risk and ongoing work to treat.  These risks
materially require national intervention as they are not unique to our Board and supply
chains for controlled staff groups are determined by government and as such constrains our
ability to make significant traction on some of the prescribed planning priorities for the
Delivery Plan.   
We anticipate that a consequence of the Agenda for Change Pay reform reduced working
week, and to a lesser extent protected learning time, will materially impact on our clinical
registrant risk stimulating further challenges in relation to supply and capacity which again
will not be unique to our Board.  NHS Ayrshire and Arran is proactively taking steps to assess
the risk and potential staffing resource required as mitigation in implementing the residual
hour that remains of the reduced working week which will have a material impact across all
organisational activity both clinical and non-clinical. 
An implementation plan for eRostering was in place during 2024/25 with the early adopter
areas being Nursing, Midwifery and Allied Health Professions by November 2026, with a full
rollout to the organisation by approximately November 2027.  Following a review, the rollout
was paused in October 2024, due to a number of issues and challenges that had been
identified during the first phase of the roll out.  A recovery plan is being drafted detailing the
challenges and barriers identified and recommendations to progress with implementation. 
The University of the West of Scotland (UWS) work in partnership with NHS Ayrshire and
Arran Nursing and Midwifery Teams to provide Practice Learning Experience for their
students. The overall aim of the UWS pre-registration programmes are to prepare students
for the academic awards and eligibility to apply for Professional Registration with the NMC.
The Executive Nurse Director along with Chief Nurse for Professional Development meet
with Strategic UWS Partners to ensure robust planning is in place.
411

Page 412

Post registration education is supported through an education fund (previously known as
SLA). This supports Nursing, Midwifery and Allied Health Professionals (NMAHP)
Registrants with continual professional development.
NMAHP clinical teams from NHS Ayrshire and Arran, led by the Chief Nurse for Professional
Development, work with UWS lecturers to ensure appropriate transition from 3rd year
undergraduate student to Newly Graduated Practitioners. This ensures clear
communications on recruitment processes, support in terms of the National Flying Start
Programme.
The Practice education facilitators (PEFs) team support clear collaborative between service
and Higher Education Institutions (HEIs). PEFs are a national network of nursing and
midwifery registrants that support learning in practice by working with staff within the practice
learning environments. They work alongside other partners in practice education such as
Care Home Education Facilitators (CHEFS) and Practice Education Leads. Practice
education involves teaching and learning that happens in practice or work based settings.
PEF’s work in partnership involving NHS Education Scotland (NES), National Health Service
Boards (NHS) and HEIs.
Close partnership working with Ayrshire College and NMAHP Professional Development
Teams, has led to the development and graduation of 19 band 4 Assistant Practitioners
within Acute Services with a further Mental Health Cohort of 11 trainees this academic year.  
A Practice Development Unit has been opened over the last 12 months by the Lead for
Practice Development. This allows an education space that can be utilised for education of
both registrants and Healthcare Support Workers.   This unit supported the education of 30
Internationally Educated nurses to achieve NMC registration. 
AHP Workforce transformation has continued through four distinct work streams:
• Digital and business support;
• AHP Healthcare support workers;
• Recruitment and retention; and
• Advancing practice.
A block recruitment approach for newly qualified AHPs was tested in 2024/25 with
successful outcome in terms of appointment to Band 5 posts across professions. 
International recruitment has also been utilised with success, in particular in filling previously
hard to fill posts in radiography. 
The AHP Leadership team continue to work in partnership with Ayrshire College in delivering
the ‘Access to AHP’ programme and are building strategic links with the Scottish HEIs who
deliver pre-registration AHP programmes.   
Aims/Objectives 2025-2026 (Year 1) KPI
Achieve further reductions in nursing agency staffing use
and continue to optimise bank arrangements. 
• Zero off framework usage
• HCA usage via bank only
• £1.2 m reduction in nurse agency
expenditure related to reduced agency
rate cards
412

Page 413

• £2.1 m reduction in nurse agency
2025/2026
Achieve reductions in medical locum spend. Lower level of agency spend via substantive
appointments to vacant medical posts
(reduction in consultant vacancies) and where
locum spend is necessary appointment as
NHS locum or adherence of Direct
Engagement compliance.
Encourage attendance - continued focus on our sickness
absence position with aspiration to narrow the gap between
current versus 2019/20 performance.
Cumulatively will contribute to our overall
ambition of a **% reduction for FY 2025/26 i.e. a
rate of **%.   
Please note this trajectory will be set once we
have the final outturn for FY 2024/25, which
has been an atypical performance year with
significantly elevated levels of absence, and
can assess the position and determine a
realistic trajectory of improvement for 2025/26 
Actions
2025-2026 (Year 1)
By When
Within our Acute Services sector work is ongoing in
collaboration with external contractors to review
establishment by all ward areas so as there is clarity as to
vacancy pressures and spend is more appropriately
directed towards substantive staffing solutions.  
Work is underway in tandem regarding rostering practice
to ensure that headroom / unavailability criteria and
parameters are robustly followed and we have ongoing
open adverts for staff joining our bank.
March 2026 
Continue to engage locums directly with the Board
Medical supplemental staffing group in place and grip and
control measures have been introduced. 
Work remains ongoing in looking at workforce planning
across our medical specialties, and implementing our
vision of Best Medical Workforce Strategy 
March 2026 
Make best use of our technology to increase efficiencies
in administrative and support services.
March 2026 
Undertake deep dive to look at how we may better
address the largest reason for absence (approximately
30% of all sickness absence relates to anxiety, stress,
depression and other mental illness).
March 2026 
Consistent and ongoing organisational messaging to
employees advising of support and wellbeing as well as
encouraging all staff to use their annual leave entitlements
fully, and throughout the year, to ensure they have rest
and recuperation.
March 2026 
Develop and launch a programme for undergraduate
nursing students to increase their knowledge of NHS
Ayrshire and Arran to further support their transition into a
Newly Graduated Nurses.
April 2025
Introduce a leadership programme for Band 6 and 7 within
NMAHP in line with the NMAHP Strategy to ensure a
prepared workforce.  
May 2025
To educate the current Practice Assessors and
Supervisors on the new C25 programmes for
undergraduate BSc Adult and Mental Health
Programmes. 
August 2025
413

Page 414

Increased communication and processes of the 2025
yearly recruitment for Newly Graduated Nurses and
Midwives to both students, HEIs and clinical teams.  
September 2025 
16. Digital 
The NHS Ayrshire and Arran Digital and Data Strategy 2023–2026, titled "Digital Excellence
in Healthcare: A Platform for Change," outlines our vision for creating a unified digital
infrastructure. This will ensure our organisation is equipped to seamlessly connect with
health and social care partners and national networks. The strategy establishes a technical
foundation for integration, enabling the delivery of efficient, patient-centred care when and
where it is needed.
Our digital strategy takes a system-wide approach and embodies a commitment across
Ayrshire and Arran to deliver an integrated care record. Capital investment has been
prioritised to advance this strategy, as it is seen as a cornerstone of reforming how the
Health Board delivers care closer to the patient. By embracing digital transformation, we aim
to introduce new ways of working across clinical and non-clinical settings, reducing
duplication, mitigating clinical risks, and supporting our workforce to deliver health and care
services effectively.
The optimisation of digital and data technologies is central to improving health and care
services. Enhanced patient access, improved safety, and continuity of care are achieved
through integrated single patient records that track the patient journey. This transformation
enables real-time care delivery supported by accurate and insightful data, live bed
management tools, and improved collaboration across the health system. These initiatives
prepare the Board for the future demands of the National Care Service and support reform
programmes, such as the integrated care record and distributed working.
Ongoing investment in TrakCare, our Patient Management System, is pivotal to developing
a fully integrated care record. The first milestone in this journey was migrating to a Software
as a Service (SaaS) solution, which ensures system stability and availability while reducing
hardware costs and aligning with national cloud-first objectives. TrakCare as a Service
supports innovation by enhancing clinical decision-making through real-time data
integration. The system’s scalability accommodates growth without significant investment in
physical infrastructure, underscoring its long-term value.
Maximising M365 capabilities remains a priority. Ayrshire and Arran participate in the
federation project, enabling seamless collaboration with two local authorities via Teams.
Work is underway to bring the third local authority onto the M365 platform. Developers are
also exploring the Power Platform to reduce reliance on third-party digital solutions. One
early success is the creation of a Desk Booking app to support the Distributed Working
Programme. Applications nearing the end of their lifecycle are being evaluated for
replacement with M365-based solutions to ensure cost-effectiveness and return on
investment. Additionally, dedicated resources are developing multidisciplinary teams
(MDTs) within the Teams environment for cancer care, fostering efficiency and cross-
specialty collaboration.
414

Page 415

Cyber resilience is an ongoing focus. Over the past 12 months, compliance with the
Refreshed Public Sector Cyber Resilience Framework (NIS audited areas) has increased
by 19%, compared to a 2% rise the previous year. Improvements in supplier and risk
management, alongside initiatives such as the Digital Champions Network and digital
training for non-executive directors, have been highlighted as examples of good practice.
Continued engagement with the Cyber Centre of Excellence ensures proactive monitoring,
reporting, and incident response.
Developing digital skills is integral to our strategy.  A Digital Skills Champion role has been
established to lead this work, complemented by a growing Digital Champions Network. A
recent digital skills survey is informing resource planning to ensure staff are equipped to
navigate the digital world as both employees and citizens.
A governance framework for Accelerated National Innovation Adoption (ANIA) projects is in
place to ensure alignment with local and national priorities. This process includes pre-
scoping checklists, business case development, and approval workflows to coordinate
resources, avoid duplication, and support evidence-based decision-making. A Strategic
Digital Delivery Group (SDDG), chaired by the Chief Executive, oversees the
implementation of the digital strategy. This group ensures strategic alignment across NHS
Ayrshire and Arran, including close collaboration with the three Health and Social Care
Partnerships. By adhering to this structured approach, the following benefits are realised:
• Efficient resource utilisation to deliver best value;
• Improved coordination to identify synergies and minimise overlap;
• Informed, strategic decision-making; and
• Elimination of siloed working practices.
The SDDG ensures that NHS Ayrshire and Arran remain at the forefront of digital
transformation, driving innovation and delivering sustainable improvements in healthcare
delivery.
Aims/Objectives 2025-2026 (Year 1) KPI
Adoption and implementation of the national digital
programmes.
- Open Eyes Optometry project initial
implementation complete in first services.
- National Child Health system to go live
within Ayrshire and Arran.
- M365 launch of One Drive and Sharepoint
pilot to expand to other areas following
completion of work in Digital Services.
- eRostering - completion of Nursing
Directorate rotas.
Improving cyber resilience and compliance. Cyber resilience and compliance
Provide Executive support and commitment to optimising
use of digital and data technologies.
Optimisation of use of digital and data
technologies.
Work collaboratively with other organisations to scale and
adopt innovation.
- Options appraisal for Digital Dermatology
project approved
- Scan for Safety project implemented within
Ayrshire and Arran
Set priorities and report progress in line with Board's Digital
Strategy.
New Digital Strategy for the Board. 
415

Page 416

Actions
2025-2026 (Year 1)
By When
Continue to work with Digital Health and Care and NSS
on a number of national projects.
March 2026
Improve on the overall compliance score for NHS Ayrshire
and Arran in the 2024/25 Network and Information
Systems (NIS) Audit.
February 2026
Continue with quarterly meetings of the Strategic Digital
Delivery Group chaired by the Chief Executive.
June 2026
Continue working with regional and national groups
including the Accelerated National Innovation Adoption
group.
March 2026
Align with the national cloud first strategies to provide
resilient access to systems, flexible approaches to our
data and storage requirements and increased security of
systems.
March 2026
Review and update the Board's Digital Strategy during
2025/26.
December 2025 
17. Climate 
To establish a greener, board-wide estate, continuous engagement with stakeholders,
including building occupiers, is essential. These teams play a crucial role in promoting
efficient energy use. Despite the current system pressures, sustainability must remain a
priority alongside patient care. Emphasising the benefits and importance of sustainability is
critical, as it contributes to creating a safe, energy-efficient, and environmentally friendly
estate, which ultimately enhances patient care.
Energy consumption is a key factor in decarbonising the NHS Ayrshire and Arran estate and
requires a flexible approach to reduction.  A significant challenge lies in transitioning the
retained estate’s heat sources to low-carbon alternatives. Implementing innovative
technologies such as solar power and heat pumps is particularly challenging in ageing
buildings, where structural limitations can restrict feasibility.  Additionally, hospitals operating
around the clock require a dependable, uninterrupted energy supply.
There is strong interest in exploring new renewable and green energy sources. The Board
will collaborate with NHSScotland colleagues, other health boards, and external partners to
better understand the processes required to procure such energy solutions.  It is recognised
that achieving this will require robust infrastructure planning, sufficient time, and
coordination, particularly for transitioning high-emission sites within the ageing estate.
The transport fleet transition to fully electric vehicles is progressing, with the pool car fleet
procurement complete and efforts underway to convert the commercial fleet. Over the next
12 months, charging infrastructure will be expanded to ensure all EV pool and commercial
users can charge their vehicles at work.  Additionally, the NHS Ayrshire and Arran
Sustainable Travel Action Plan (2024–2027) will be implemented through the Active Travel
and Transport subgroup of the Climate Emergency and Sustainability Officers Group
(CESOG).
416

Page 417

We will continue to optimise greenspace to enhance biodiversity for the benefit of patients,
visitors, and staff. This includes advancing the Kyle Chemotherapy Garden project in
2025/26 and exploring creative uses of greenspace for therapeutic purposes, such as green
gyms, mindfulness activities, walking groups, and other outdoor initiatives known to support
physical and mental health. Active travel to our sites will also be encouraged, and we will
collaborate with local authority partners to develop active travel routes.
Our pharmacy sustainability program will continue efforts to reduce the use of harmful
substances and adopt more sustainable delivery methods, including reducing the
prescription of antimicrobials.
Progress on these initiatives will be monitored and reviewed by our Climate Emergency
Sustainability Operational Group (CESOG).
Aims/Objectives 2025-2026 (Year 1) KPI
Greenhouse Gas Emission reduction (Energy) Improve
the overall Building Energy Emissions in line with national
targets and from the previous year generated from the
Boards estate assets.
Complete the delivery of agreed list of in year
energy efficient projects and agreed
programme of works for the next 12 months. 
Report on savings to be achieved based upon
actual datasets.
Sustainable Travel - Improve the overall Transport
Emissions in line with national targets and from the
previous year generated from the Boards estate owned
transport and infrastructure.
Completion of the fleet hand over to the
various services across the organisation. 
Report on progress.
National Waste Targets - Reduce domestic waste by a
minimum of 15%, and greater where possible, compared to
2012/13.
Reduce domestic waste by a minimum of 15%,
and greater where possible, compared to
2012/13.
National Waste Targets - Reduce food waste by 33%
against 2015-16 baseline.
Reduce food waste by 33% against 2015-16
baseline.
National Waste Targets - Ensure 70% of domestic waste
is recycled or composted.
Ensure 70% of domestic waste is recycled or
composted.
National Green Theatre Actions - Improve on the
reduction in medical gas related emissions across the
board wide estate.
Implementation of changes to current
processes and procedures.
Greenspace and Biodiversity Kyle Chemotherapy Garden will be producing
year 1 spring bulbs and patients, visitors and
staff making use of the area.
Green gym and walking programmes fully
embedded at UHA/ Ailsa and woodland view
and walking programme in place for UHC
and other sites 
Actions
2025-2026 (Year 1)
By When
Reduction of Boards carbon and greenhouse gasses
through estates rationalisation and demolition programme
– risk that distributed working is resisted and unable to
vacate buildings earmarked for demolition.
March 2026
Continue to reduce emissions from travel and transport
activities through:
- Electrifying fleet – risk that suitable commercial vehicles
are not available at this time to replace current fleet
vehicles; and 
- Continue to work with public health on the development
and delivery of the sustainable travel Action plan-24-27 
Ongoing until 2035 
Ongoing until 2027
417

Page 418

and installing infrastructure with funding available in
25/26.
Waste 
- Reducing domestic waste by 15% compared to
2012/13;
- Reduce food waste by 33% against 2015-16 baseline;
and 
- Ensure 70% of domestic waste is recycled or
composted.  
All ongoing throughout year and will all be
tied into the new waste contract commencing
1/4/25 
Work in conjunction with Local Authorities and other
partner organisation to adopt more environmentally
friendly processes for grassland management on
grassland management.
All Ongoing throughout year, with different
phases being implemented in different
seasons. 
Continue to progress the development of Kyle
chemotherapy garden and green gym initiatives with
partner organisations and community wealth building
initiatives.  Opportunity to support community justice teams
in the Kyle garden project.
All Ongoing throughout year, with different
phases being implemented in different
seasons. 
18. Finance 
Situation
The health board set a deficit budget of £56.4 million for 2023/2024 financial year and £53.5
million for 2024/2025.  For 2025/26, the scale of cost pressures requires the Board to
achieve 3% CRES to stand still. 
The funding for New Medicines is less than the cost pressure.  In 2024/25 the NHS Ayrshire
and Arran deficit is about £8.8 million expected gap between funding (£16.7 million) and
expected spend (£25.5 million).  A 10% increase in 25/26 would increase cost to £28 million.
The Board is striving to achieve 3% (£30 million) cash releasing efficiency savings in
2025/2026, however currently not all of these have firm plans.  We expect CRES to rise to
£30 million recurring savings in the next plan due in mid-March 2025.
A significant risk for 2025/2026 will be the pay settlement which is not within the Board’s
control.
Background
Throughout 2022/2023 our acute hospitals had 180 unfunded beds open at a cost of £12.5
million.  Many of these were occupied by Delayed Transfer of Care (DToC) patients.  Our
objective in 2023/2024 was to close all of these unfunded beds and achieve cost avoidance. 
We only partially achieved this in 2023/2024 and still had 150 unfunded beds open with a
cost of around £12.5 million.  During 2024/2025 further progress has been made, however
we still have 90 unfunded acute beds which could all be closed if we achieved the Scottish
average length of stay through the SAFER programme. 
NHS Ayrshire and Arran is unusual in that our integration scheme leaves the risk for primary
care prescribing overspends and the associate cost pressure with the Health Board rather
than Integration Joint Boards.  In 2022/2023 the primary care prescribing volumes increased
by 2% which was budgeted for, however the price per item increased by over 10% which
was not budgeted for and resulted in a 2023/2024 cost pressure of about £12.5 million.  This
contributed to the underlying deficit position.   As part of the updating of the Integration
418

Page 419

Scheme finance leads requested for Integration Joint Boards to take full financial
responsibility from 2024/2025 for primary care prescribing and in 2024/25 finance leads
agreed to a shadow year.  However, as the year has progressed there is no consensus nor
partnership agreement that enables that transfer of this cost pressure and it remains an area
of discussion as part of the partnership agreement review.   
£11.3 million of the underlying recurring financial deficit has been in place since 2017/2018
and relates to a number of cost pressures in that year where the general allocation funding
uplift was 0.4% and the balance could not be met from efficiency savings.  In 2022/2023 this
deficit increased to £26.4 million as a result of unfunded Covid related costs and inflationary
and demand pressures.  
The core e-health infrastructure for NHS Ayrshire and Arran was very poor and therefore
there is a requirement to upgrade systems, make networks more secure and increase band
width to improve speed of connection.  A strategy of moving toward cloud based hosting (in
line with Scottish Government policy) comes with significant costs and is a revenue cost
pressure as opposed to capital cost for replacing servers etc.  The additional costs of
Microsoft Office 365 were only partially funded in previous years and therefore in 2023/2024
there was a cost pressure of £1.4 million for Microsoft Office 365 and in 2024/2025 a further
£0.5 million.  In addition there was a £3.15 million cost pressure for other system
infrastructure upgrades, additional digital staff and some cloud hosting of key systems in
2023/2024 with a further £0.5 million investment in digital in 2024/2025.
Historical Deficit Contribution £million
New medicines 8.8
Unfunded acute beds 12.5
Primary care prescribing 12.5
Pre pandemic deficit 11.3
Covid and inflationary pressures 15.1
Teams and digital investment 5.6
Total 65.8
In the 2024/2025 revenue plan, planned CRES of £24.1 million (plus sustainability funding
of £5.6 million) exceeded the cost pressures of £18.5 million by £11.2 million which reduced
the underlying deficit of around £54 million, however inflationary pressures on supplies
budgets and delays in CRES delivery have required non-recurring measures to live within
the £53.5 million deficit for 2024/25. The underlying recurring deficit remains similar to the
table above as some of the 24/25 CRES was not achieved recurringly and backfilling
measures are non-recurring.
Assessment
The energy cost increase over 2022/2023 and 2023/2024 amounted to over £5 million which
required a doubling of the recurring budget.  The £1.6 million further cost pressure in
2024/2025 was treated as non-recurring (in the expectation of a price fall) as was the clinical
negligence or risk indemnity scheme (CNORIS) contribution temporary increase of £1.1
million. 
Demand increased for pathology reporting which required extra reporting capacity to be
purchased from the private sector in 2023/2024 and 204/2025 at a cost of £0.5 million. 
Biochemistry test volumes from GPs have increased the cost of the managed service
419

Page 420

contract.
The integration scheme sets out the position in relation to the set aside budget that the
Integration Joint Boards should contribute financially if they are responsible for increased
use of acute services and an analysis of occupied bed days used by them on relevant
specialties show an increase by 22,000 compared to pre-pandemic.  Risk sharing in these
areas is an area of discussion between NHS Ayrshire and Arran and the Integration Joint
Boards as the Integration Schemes are being reviewed however the financial aspect of
commissioning will not be implemented in 2025/2026. 
Actions Being Implemented
Governance
The Board has re-set and strengthened the governance supporting and enabling CRES
creation and delivery, during 2024-25 with additional Programme Management support
provided by external contractors. 
Best practice documentation and the introduction of an Improvement Programme Steering
Group, which is the improvement delivery group reporting through to an Executive
assurance and delivery group (Financial Improvement Scrutiny Group).
Quality / Patient Care
The Corporate Management Team have approved a CRES approach based on the national
strategy ‘Delivering Value Based Health & Care; A Vision for Scotland’.  The Medical Director
is the Executive lead supported by the Recovery Director.  This will ensure clinical buy-in for
fundamental service change. 
The aim is to build out from the Realistic Medicine approach and implement a three year
programme that is a clinically led value-based efficiency approach to support delivery of the
medium-term efficiency programme.  The efficiency programme will run alongside the cost
reduction approach to reduce costs further. Enhanced performance management
arrangements and reporting will provide additional scrutiny and assurance.  To achieve the
latter an extension of the support from external contractors has been sought.
The average length of stay within the Ayrshire acute hospitals post pandemic has been
around 10 days which is significantly higher than the Scottish average and much higher than
that achieved in England.  Actions being taken to reduce the length of stay include pathway
reviews, training of clinical staff on SAFER methodology and cohorting of patients clinically
fit for discharge with more AHP and less medical input.  The wards where SAFER has been
introduced have seen a reduction in length of stay therefore it is being rolled out more widely.
Workforce
The use of agency staff is largely driven by the acute unfunded beds.  Agency nurse spend
for 2022/2023 was £10.6 million and reduced to £9.7 million in 2023/2024 with further
reduction projected in 2024/2025.  Medical agency has been around £6 million per annum
due to consultant vacancies, however has a target to reduce this by £1 million in 2025/2026. 
Both reducing agency and the closure of the unfunded beds are cost reduction rather than
cash releasing efficiency savings as there is no recurring budget for these.  A reduction in
sickness absence would reduce the need for agency staff. 
420

Page 421

To support the CRES programme, there is a need to continue the Recovery Director in
2025/2026, supported by Programme Management and a Finance Business Partner.  We
are structuring the 2025/2026 plan around Realistic Medicine (Better Value Better Health)
to get strong clinical support and leadership of change. Individual schemes will be approved
through an Improvement Programme Steering Group which has strong operational
membership and each scheme will have a workbook and Quality Impact Assessment.  An
operation Programme Management Office within our Acute Directorate will comprise
Improvement Leads, Project Managers and will be supported by finance, HR, digital etc. 
Operational Grip and Control
Additional grip and control measures have been introduced during 2024-25 across core pay
and non-pay areas.  Each area being Director led. 
The Board is currently refreshing the bed demand model which will be used to inform the
relevant establishment (demand and supply) requirements from 2025-26.  Through this work
the whole system bed requirements will be better understood.
Integration and whole system working will improve from 2025-26 with a focus on population
health, public health and prevention with the aim of adopting an open book policy,
optimisation of the  Ayrshire resource budget, development of integrated pathways, to
support workforce transformation, clear Partnership Agreement underpinned by a clear risk
share and reward framework.
Financial
The financial plan details the CRES plan for 2025/26 which includes IJB CRES as these
count towards the 3% CRES target (although these do not offset any of the Health Board
cost pressures and a net 3% increase in funding for IJBs has been ‘passed through’). 
Tighter grip and control on non-pay spend through procurement controls, reducing waste in
theatre consumables, managing demand for laboratory tests, replacing taxis with community
transport provider for renal patients and reducing energy expenditure will reduce
overspending areas through cost reduction schemes.
To minimise the deficit, three parallel streams of work are needed:- 
• Reform of acute services to reduce length of stay, close speedily all unfunded beds (cost
avoidance) and thereafter close funded acute beds to release cash releasing efficiency
savings.
• Achievable cash releasing efficiency savings targets set for most Directorates (3%)
except Integration Joint Boards.  The savings template does not yet reflect all of these
as firm plans for savings and the pipeline is being validated to get a realistic target.
• Rebalance the financial risk between the Health Board and Integration Joint Boards in
relation to:- 
- primary care prescribing and overspends; and
- payments through set aside for acute beds occupied by delayed discharge patients. 
Risk Assessment / Management
Added unfunded beds have been a constant cost pressure for the Board and securing the
right sized bed-based for care in all care settings, remains a priority for the system.  This
work is being supported with the additional and experienced resources provided by external
contractors and remains an important part of the Boards sustainable recovery plan.
421

Page 422

For the first time our IJBs, North, South and East Ayrshire have raised concerns for the
sustainability of the services devolved to them.  Our IJBs no longer have financial reserves,
and North Ayrshire has required a year end settlement to break even.  The 3% uplift does
not cover the cost pressures for our IJBs and service reductions will need to be made which
will put further pressures throughout all parts of our system.  We will continue to work in
partnership, revised the partnership commission and secure an Urgent and Unscheduled
Care commission in order that system pressures are as transparent as they need to be.
It is acknowledged that any significant redesigns of service provision would require public
and clinical consultation, and Scottish Government support therefore cannot be
implemented speedily however a major driver for change is delivering a sustainable health
service within the envelope of funding available.  It is difficult to quantify the savings from
the above as the main driver is reduction in the acute bed base. 
Policy Drivers
A significant cost pressure for 2024/2025 is the New Medicines Fund where the cost of
medicines approved by the Scottish Medicines Consortium continually increases in line with
the Government policy to increase access to medicines.  This includes cystic fibrosis
medicines, end of life cancer drugs, orphan drugs and ultra-orphan drugs which have a very
high cost per quality adjusted life year.  A potential new cost pressure of £11 million for
injectable drugs for weight loss has not been included in the financial plan.
Limited investment for social care through our Local Councils.
Finance Projections
A three year financial plan has been developed showing detailed cost pressures for 2025/26
and estimates for future years.  Funding settlements for 2026/27 and 2027/28 are currently
unknown, however the assumption is that cash releasing efficiency savings of at least 3%
will be required each year.  The financial plan is to reduce the deficit to move towards
financial sustainability over a number of years, as major service change requires public
consultation and Scottish Government approval.
422

Page 423

Agenda Item 11
423

Page 424

424

Page 425

425

Page 426

426

Page 427

427

Page 428

428

Page 429

429

Page 430

430