10. FOR INFO - NHS Ayrshire & Arran Delivery Plan 2025-26

North Ayrshire Council · 21 August 2025
Back to Integration Joint Board — 21 August 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

NHS AYRSHIRE AND
ARRAN
DELIVERY PLAN
2025-2026

Page 2

Contents
Chief Executive Summary ............................................................................................................... 3
1. Introduction ................................................................................................................................. 3
2. Population Health and Reducing Health Inequalities ....................................................... 4
3. Quality and Safety .................................................................................................................... 10
4. Value Based Health and Care ............................................................................................... 11
5. Women and Children’s Health .............................................................................................. 13
6. Planned Care ............................................................................................................................. 17
6.1  Cancer ................................................................................................................................. 22
6.2 Musculoskeletal Health .................................................................................................. 22
7. Unscheduled Care ................................................................................................................... 24
7.1 Delayed Discharges ......................................................................................................... 29
8. Urgent Care ................................................................................................................................ 30
9. Primary and Community Care .............................................................................................. 31
10. Mental Health ......................................................................................................................... 34
10.1 CAMHS ................................................................................................................................ 35
10.2 Psychological Therapies ................................................................................................ 37
10.3 Community Mental Health Services ............................................................................ 38
10.4 Unscheduled Care ........................................................................................................... 39
10.5 In Patient............................................................................................................................. 40
10.6 Alcohol and Drug Service .............................................................................................. 41
10.7 Learning Disabilities ....................................................................................................... 43
11. Healthcare in Custody ........................................................................................................ 45
12. Pharmacy ............................................................................................................................... 46
13. Infrastructure ......................................................................................................................... 48
14. Community Wealth Building / Anchor ............................................................................ 49
15. Workforce ............................................................................................................................... 51
16. Digital ...................................................................................................................................... 54
17. Climate .................................................................................................................................... 56
18. Finance ................................................................................................................................... 58

Page 3

Chief Executive Summary 
NHS Ayrshire and Arran faces financial challenges in 2025/26 and beyond with a
requirement to create and deliver a sustainable health and care service within the envelope
of funding available. 
The financial context for NHS Ayrshire and Arran is challenging with a forecast budgetary
gap of £33.1M for 2025/26.  The Board will continue to develop a wide range of cash
releasing savings through service improvement and collaborations with our Health and
Social Care and System partnerships.  It is acknowledged by the Board that the route to
achieving financial balance will require service reform that will be delivered over the next 2
– 5 years. 
Our health and social care partners are also experiencing financial challenges, and it is
acknowledged that these financial pressures could impact some of the improvements that
are forecast within our acute service improvement plans. However, as a system we are
committed to working together to mitigate and manage these system pressures as they
emerge. 
The Board continues to have strategic workforce risks in relation to medical, nursing and
AHP supply and capacity. This is particularly challenging with regards to the medical
workforce and is maintained on the Strategic Risk Register as a very high risk, despite
treatment.  These risks will require national support and change as they are not unique to
our Board but are linked to national supply chains for controlled staff groups and as such
constrains our local ability to get traction on some of the prescribed planning priorities for
the Delivery Plan. 
Unscheduled Care and Planned Care demands continue and the Health Board remains
committed to achieving high standards of efficiency and productivity while ensuring robust
performance management and governance structures are in place to monitor safe delivery. 
The core aim to our service improvement programme being to enhance care pathways,
reduce duplication, and eliminate waste without compromising the quality and safety of our
patients and staff. 
1. Introduction   
The Delivery Plan (DP) has been prepared collaboratively with our partners, to provide
Scottish Government with confirmation that we have plans in place to demonstrate how our
health and care system will continue to stabilise and improve from the incredible pressure
which continues to be experienced. 
The Delivery Plan sets out our strategic context and priorities, and those of our partners in
the health and social care sector, which are aligned to the national priorities of the Scottish
Government and NHS Scotland as a whole.

Page 4

We have worked alongside service leads across the health and care system within Ayrshire
and Arran to develop the Delivery Plan which focuses on system redesign and improvement,
to strengthen our services to meet increasing and more complex demand within a backdrop
of significant financial pressures. 
The Delivery Plan continues to be underpinned by our Caring for Ayrshire Vision, which is
driven by the need to rebalance health and care so that it is less acute focussed and there
is a stronger emphasis on delivering care in a variety of alternative and more locally based
settings. Caring for Ayrshire is a longer term vision which will take a number of years to fully
deliver and will require significant service change aligned to investment in infrastructure.  
The Delivery Plan is informed by appropriate quality, financial and workforce planning, as
well as setting the context for more detailed planning for the delivery of specific services and
the effective running of the organisation, such as digital, governance, and other corporate
functions.
Recognising the significant level of reform and redesign required we will maintain robust
stakeholder engagement to foster a bottom-up development and delivery process that
leverages the expertise of staff, patients, partners and communities, in line with the Planning
with People Framework.
Detailed actions for the recovery and stabilisation of our services are included in Delivery
Plan.  The delivery plan will be monitored regularly by the Improvement Programme Steering
Group, with each priority championed by the Recovery Director and managed through the
Operational Delivery Unit (ODU). 
2. Population Health and Reducing Health Inequalities 
In June 2024, the Cabinet Secretary for Health and Social Care outlined our vision: A
Scotland where people live longer, healthier and more fulfilling lives.  The vision is supported
by four key areas of work:  improving population health, a focus on prevention and early
intervention, providing quality services and maximising access.  Building on the positive and
innovative actions already taking place across areas including tobacco and alcohol control
to improve population health and reduce health inequalities, a long term Population Health
Framework is being developed, which the work we are prioritising will align to. 
Ayrshire, with an estimated population of 368,549, presents a diverse demographic
landscape. The majority of its residents, about 70%, live in urban areas, totaling 257,984
people. The remaining 30%, or 119,565 individuals, reside in rural settings. 
The age distribution reveals a varied population structure. Young residents aged 0-14
constitute 15.5% (56,992), while those in the 15-29 age bracket make up 16.1% (59,171).
The 30-44 age group also represents 16.1% (59,392), indicating a stable young adult
population. The largest age group is 45-59, comprising 22% (81,049) of the population,
followed by those aged 60-74 at 20.1% (74,105). Seniors aged 75 and above form 10.3%
(37,840) of the population, highlighting a significant elderly demographic.

Page 5

Health inequalities in Ayrshire and Arran are influenced by various socio-economic factors.
Here are some key areas of concern: 
Life Expectancy and Mortality: Life expectancy in Ayrshire and Arran is generally lower
than the Scottish average, with notable disparities between different areas. For example,
North Ayrshire has some of the lowest life expectancy, whereas South Ayrshire is closer to
or above the Scottish average. 
Chronic Diseases: The region has higher rates of chronic diseases such as chronic heart
disease (CHD), chronic obstructive pulmonary disease (COPD), and asthma. These
conditions are closely linked to socio-economic deprivation. 
Mental Health: Mental health issues are prevalent, with higher rates of hospital admissions
for mental health conditions compared to the national average. This includes conditions such
as depression, anxiety and self-harm. 
Emergency Hospital Admissions: Ayrshire and Arran have higher rates of emergency
admissions, which can be indicative of underlying health inequalities and access to primary
care services. 
Health Behaviors: Behaviors that impact health, such as smoking, alcohol consumption,
drug use and poor diet, are more common in deprived areas. These behaviors contribute to
the higher prevalence of chronic diseases and lower life expectancy. 
Access to Services: There are disparities in access to healthcare services, with rural areas
facing more significant challenges in accessing timely and adequate care. 
Getting it Right for Everyone (GIRFE)
Getting it right for everyone (GIRFE) is a multi-agency approach to health, social work, and
social care support and services from young adulthood to end of life care. As a practice
model it intends to shape the culture, design and delivery of health and social care services,
providing a more personalised way to access help and support when it is needed. The
ambition of GIRFE is to place the person at the centre of all the decision making that affects
them, with a joined-up consistent approach regardless of the support needed at any stage
of life. GIRFE has been co-designed by the Scottish Government, Health and Social Care
Partnerships, and the people of Scotland. 
A national toolkit has been developed with a focus on a ‘Team Around the Person’ approach,
which was developed collaboratively with people with lived experience and those with
professional experience. The ‘Team Around the Person’ toolkit provides a starting point and
a framework which can support the implementation of a GIRFE approach. 
East Ayrshire and South Ayrshire Health and Social Partnerships have been pathfinders in
this process, along with other HSCP’s, to inform the national toolkit.  GIRFE has been and
continues to be an ongoing iterative process and we continue to be involved in monthly
national meetings focussed around embedding GIRFE and sharing learning with other
HSCP’s across Scotland.  Good progress has been made in testing GIRFE within our
delivery models over the last year and this work will continue to embed the GIRFE Team
Around the Person Toolkit to support a person-centred, consistent and individualised

Page 6

approach to health and social care support, based on multi-disciplinary and inter-agency
working, with ongoing learning and feedback within 2025-26. 
Child Poverty
Public Health are progressing a life course approach to mitigating and preventing poverty,
internally through a dedicated action plan for tackling child poverty for the organisation, and
externally through our work supporting development of Local Authority and Community
Planning Partners through the development of Local Child Poverty Action Reports. 
In the initial stages of the year ahead we will continue to work closely with our partners in
terms of developing actions and sharing the evidence base with regards to poverty. We will
look across our internal NHS activity with regards to how our actions can support our
partners plans and identify what expertise, evidence and knowledge we can provide to
support planning and reporting. 
As an organisation the NHS has little control over the drivers of child poverty, however,
through providing assistance to partners and through internal assurance processes we will
endeavour to influence local and partnership activity which can. 
Tobacco
Locally, our NHS Ayrshire and Arran Tobacco Action Plan for our smoking cessation service,
Quit Your Way, have identified two improvement actions to be included within this Delivery
Plan.  The first is to increase smoking cessation referrals from other services such as
secondary/acute and mental health.  The Quit Your Way team can support staff within these
services to raise the issue of smoking and referral pathways through the delivery of training
and awareness raising sessions.  Additionally, the team can support the development and
delivery of specific quality improvement projects which aim to increase the identification and
offer of support to those who smoke. 
The second is to skill Quit Your Way staff to support the wider determinants of smoking
behaviour by identifying wider supports required and by providing information, signpost or
referral in response.
These actions also contribute to the wider Public Health, and Healthcare Public Health,
agenda by supporting developing “Waiting Well” action, which aims to improve the health of
those on our acute services waiting lists and so contribute to more positive outcomes for
both patients and services. 
Cancer Screening
In 2023 National Services Scotland (NSS) published the Scottish Equity in Screening
Strategy 2023-2026 which provides direction on national and local actions to achieve equity
for those eligible for screening. This national plan documents five areas for action and this
applies to all six screening programmes. 
Within Ayrshire and Arran a local screening inequalities plan for 2023-2026 was developed
along the themes of:
- Communications, engagement and learning
- Access to screening
- Data collection and monitoring

Page 7

- Research and evaluation
- Overarching issues 
NHS Ayrshire and Arran have utilised a fund from Scottish Government to tackle screening
inequalities, developing projects which aim to improve the uptake of screening. This fund is
for the three cancer screening programmes only. 
This funding stream provides the Health Board opportunities to implement initiatives which
are out with core programme delivery. Over the last two years access to the funding has
changed and with increasing financial pressures across the whole system it is unclear what
funding will be available in 2025/26 and future years. Any reduction to this funding stream
will pose substantial challenges to develop and implement projects to tackle inequalities
within cancer screening programmes which are out with core programme delivery. 
If there are no additional monies provided through inequalities funding there may be
proposed actions that cannot be met due to workforce. This is due to the fact these projects
are in addition to core programme delivery and form pilots which aim to gather evidence to
support service improvement and change. These projects require staff to work additional
and unsocial hours. 
Vaccination
The delivery of the vaccination programme is based on building and retaining a trained and
skilled workforce, investing in the infrastructure to support the programme and an effective
and trusted partnership with all key stakeholders, both local and national.  
There are imminent introductions of further changes to the programme with the potential
inclusion of a vaccine for chickenpox as part of wider changes to the routine childhood
immunisation schedule which are expected to be delivered in 2025/26. 
There are currently no strategic risks associated with vaccination programmes in NHS
Ayrshire and Arran, however there are a number of operational risks including: 
• The dependence on substantive staff working additional/extra contracted hours,
supported by bank staff, to enable the successful delivery of winter vaccination
programmes (COVID-19 and flu);
• Funding allocation for vaccinations still to be confirmed for 2025/26; and
• Forthcoming changes to the routine childhood immunisation schedule and associated
requirement for additional clinic accommodation, workforce; with additional funding as yet
still to be agreed. 
Sustainable Transport
In order to support and deliver on the strategic goals set out in the NHS Scotland Climate
Emergency and Sustainability Strategy (2022-2026) as well as our own NHS Ayrshire and
Arran Climate Change and Sustainability Strategy (2021-2032) and Anchor/ Community
Wealth Building Strategy (2023-2026) we have formed an Active Travel and Sustainable
Transport sub group of our Climate Emergency and Sustainability Operational Group
(CESOG). With the support of Travelknowhow Scotland, the group has prepared an Action
Plan for NHS Ayrshire and Arran on Sustainable Travel for the three financial years (2024/25
to 2026/27).  The Action Plan sets out how we will implement actions towards the
organisation’s overall strategic goals on sustainable travel, and how we will monitor
progress.

Page 8

The action plan is informed by and interfaces with national, regional and local transport
policy and strategy which includes the Scottish Governments Transport to Health Delivery
Plan. The Action Plan provides a framework for practical measures tailored to the needs of
the organisation, individual sites, employees, patients, and visitors. It will be reviewed and
updated on a regular basis to ensure its relevance and to maintain progress on strategic
goals.  Actions are grouped according to six themes: 
• Governance, monitoring, and reporting
• Reducing the need to travel
• Enabling active travel
• Promoting public, community, and shared transport
• Decarbonising our fleet and business travel
• Reducing single occupancy car use 
There continues to be positive engagement and support in both the development and
implementation of the action plan from across NHS Ayrshire and Arran and with support
from NHS Assure and our partners in Ayrshire Roads Alliance, North Ayrshire Council and
Strathclyde Passenger Transport. Although positive progress has been made to date, there
remain clear challenges and risks which include our capacity to deliver the actions, the
ongoing capacity and engagement of our local transport partners and colleagues and limited
funding to take work forward in the manner and at the pace we would like.
Antiracism Strategy NHS Ayrshire and Arran
The development of an anti-racism strategy is being led by the Organisational and Human
Resource Department and Public Health with support from the NHS Ayrshire and Arran
Inequalities Lead and will report back to Scottish Government on progress early 2025. 
Aims/Objectives 2025-2026 (Year 1) KPI
Reduce the difference in screening uptake between the
most and least deprived quintile for each of the three
cancer screening programmes.
Improve cervical screening uptake in deprived
areas by 20%. 
Improve breast screening recall appointment
uptake by 40%. 
Improve bowel screening uptake in prison by
40%.
Increase HIV prevention, detection and retention in care.  100% of new diagnoses have completed
lookback review. 
Reduce late diagnosis of HIV to zero.   
Increase testing for HIV by 30% compared to
Q4 2024/25.
Work towards viral hepatitis elimination goals, including
through achieving Board-level HCV treatment initiation
targets.
Improve HCV treatment uptake by 100% on
Q4 2024/25
Improved access of Long-Acting Reversible Contraception
(LARC), including post-abortion and postpartum.
Improve overall LARC uptake by 40% on Q4
2024/25
Improve population health, with particular focus on
smoking cessation and weight management priorities.
Smoking Cessation 
Increase referrals by 5% each quarter 
Weight Management

Page 9

Diabetes prevention (including Gestational
Diabetes Mellitus (GDM): Aim to offer
treatment and support to 200 people 
Tier 2 weight management: Aim to offer
treatment and support to 200 people
Tier 3 weight management: Aim to offer
treatment and support to 150 people
Remission programme: Aim to offer treatment
and support to 15 people 
Actions
2025-2026 (Year 1)
By When
Cancer Screening Programmes
- Widen cervical screening outreach clinics to include
more deprived areas with low uptake;
- Implement transport initiative for recall breast screening
appointments to improve uptake for those women
experiencing travel inequalities and low income; and
- Improve staff awareness and uptake of bowel screening
in the local prison population.
March 2026
Blood Borne Virus (BBV)
- BBV service review, including review of BBV testing
policy;
- Management of BBV exposure policy; 
- Implementation of BBV diagnosis lookback; and
- Reducing stigma education campaign.  
March 2026
HCV treatment initiation targets
- Improvements to prison Sexual Health and Blood Borne
Virus (SHBBV) pathway, including dedicated testing
clinics and NearMe consultations;  
- Pilot of community treatment; and 
- Pilot of DBS testing in pharmacies.
March 2026
Smoking Cessation
Increase number of referrals to smoking quits by the
specialist Quit Your Way cessation service from 
- Acute
- Maternity 
- Mental health services and 
- From those living in our 40% most deprived communities 
Develop, deliver and evaluate pilot which utilises QYW
staff to address the wider determinants of health,
including those which may make it more difficult to stop
smoking.
March 2026
Diabetes Prevention and Adult Weight Management
Services 
- Provision of care for women at risk of gestational
diabetes (GDM) post-natally;
- Provision of early intervention and support for those at
high risk of type 2 diabetes;
- Provision of person-centred weight management support
for those with a high BMI; and 
- Provision of a type 2 diabetes remission programme
involving total diet replacement treatment for those
recently diagnosed with type 2 diabetes.
March 2026

Page 10

3. Quality and Safety 
NHS Ayrshire and Arran’s Quality Strategy describes our commitment to deliver quality
improvement and high quality care that will enable and support delivery of our strategic
objectives, and our ambition for health and care service transformation. The Healthcare
Governance Committee proposed that the current Quality Strategy would be extended to
include the period 2023-2025 and this was supported by the Board members. An evaluation
of the impact of the current Quality Strategy will begin in January 2025, with a report detailing
the findings published in July 2025. Consultation and co-design with a range of stakeholders
to guide the direction of NHS Ayrshire and Arran’s future Quality Strategy will begin in
January 2025 with a revised Quality Strategy published in 2026.   
Excellence in Care (EiC) is a national approach which aims to ensure people have
confidence they will receive a consistent standard of high-quality care no matter where they
receive treatment in NHS Scotland.  Commissioned by the Scottish Government in response
to the Vale of Leven Hospital Inquiry recommendations, Excellence in Care seeks to
improve, integrate and coordinate the way quality care services are delivered.  The NHS
Ayrshire and Arran EiC team conduct data surveillance of all reportable measures on a
monthly basis. Additionally, provision of EiC data to senior leadership and healthcare
governance team is included in all directorates’ quality and safety papers. Quality data is
sent from our local data management system to Senior Charge Nurse’s, Clinical Nurse
Manager’s and Senior Management monthly, to give an oversight of compliance with each
of their measures.  This provides the opportunity for these staff to review compliance and
identify any issues/risks and where possible make changes. 
Aims/Objectives 2025-2026 (Year 1) KPI
Deliver quality improvement and high quality care to enable
and support delivery of our strategic objectives, and our
ambition for health and care service transformation. 
Delivery of Strategic Objectives 
Actions
2025-2026 (Year 1)
By When
Evaluate the impact of the current Quality Strategy with
findings published in July 2025. 
July 2025
Develop and publish revised NHS Ayrshire and Arran
Quality Strategy
March 2026
Evaluate, re-design and implement Quality and Safety
Walkrounds 
July 2025
Co-design a Quality Improvement Capacity and
Capability Strategy 
August 2025
Develop and publish Duty of Candour Policy  June 2025
Develop and implement an improvement plan to reduce
overdue Significant Adverse Event Review (SAER)
reports and action plans
June 2025

Page 11

Review of Nursing, Midwifery and Allied Health
Professionals audit templates and operational
definitions to ensure standardisation of reporting
December 2025 
Launch and implementation of reviewed Care
Assurance Boards in in-patient areas
December 2025 
Increase the number of users accessing the Care
Assurance and Improvement Resource (CAIR)
Dashboard by 50% 
October 2025 
Implementation of Healthcare 
Improvement Scotland (HIS) Quality of Care 
Review Process
September 2025
All relevant staff are face fit tested to an FFP3 respirator
to support business as usual patient care and in the event
of responding to an incident such as Mpox Clade1 and
Measles. 
- Sessions have been established on our Acute sites in
rotation for half a day weekly to provide testing to those
staff requiring a test.
- Upscale of addition sessions is being planned should
this be required.
March 2026 
4. Value Based Health and Care 
The Realistic Medicine team continue to support the 13 high level actions from the Chief
Medical Officer’s Value Based Health and Care Plan (October 2023). This seeks to use the
principles of Realistic Medicine as an approach to achieve this. We have set out a delivery
plan that aligns to these objectives.  The main constraints to this are the limited resources
that compose the Realistic Medicine team and of the limited service engagement resulting
from a stretched and under-pressure healthcare system.
There will be ongoing work within the Realistic Medicine Team to take forward the aims of
Value Based Health & Care (VBH&C) whilst we transition to the Realistic Care Improvement
Programme.   This will enable NHS Ayrshire and Arran’s reform to be viewed through the
lens of VBH&C and an opportunity for Realistic Medicine to support embedding VBH&C into
the heart of reform and improvement.
Going forward the aims and objectives of the Realistic Medicine teams will be advanced in
collaboration with the Realistic Care Improvement Programme at a strategic level.   The final
development plan for year 2025/2026 will be integrated into the existing plan. 
Aims/Objectives 2025-2026 (Year 1)
Increase Awareness: Raise public awareness of Realistic Medicine and the need for NHSScotland to
steward its resources well particularly via social media. 
Encourage Shared Decision-Making (SDM): Ensure all health and care professionals engage in shared
decision-making and promote the “It’s OK to Ask” campaign. 
Service Users to Utilise BRAN Questions and encourage them to ask their health and care professionals
the BRAN questions. 
Improve Communication: Enhance health and care professionals' communication skills, focusing on clear,
accessible information and patient preferences, encouraging Shared Decision Making.

Page 12

Sustainability and Unwarranted Variation: Develop tools that enable health and care colleagues to seek
out and eliminate unwarranted variation in access to healthcare, treatment and outcomes.
Focus on Resource Management: Prioritise initiatives to reduce waste and harm, including overprescribing
and unwarranted tests. 
Innovation: Empowering the workforce to be improvers and innovators, bringing services closer to our
community in line with Caring for Ayrshire. 
Actions
2025-2026 (Year 1)
By When
Social Media Promotion of Realistic Medicine externally
in collaboration with the Communications Team, including
via the organisation's X and Facebook accounts.
Use of videos/information available via the national RM
website.
Communication and engagement plan to be
developed by June 2025 
BRAN Publicity materials available from NHS 24.
Promotion of BRAN internally via Viva Engage,
Communication Team and other internal methods of
communication. 
Ensure BRAN questions are included on all outpatient
appointment letters. Trial of appointment letter leaflets at
Rainbow House Child Development Centre. 
BRAN information visible in waiting rooms to enhance
decision-making via posters and note paper.  Show
BRAN/RM videos on screens within waiting areas.
June 2025 
September 2025 
September 2025 
Continue to evaluate the CollaboRATE SDM measuring
tool which is now embedded with Patient Experience
Survey across Acute sites. 
March 2026 
Health and Care professionals will be encouraged to
complete TURAS training via promotion on Viva Engage,
eNews and other methods of internal communication.
March 2026 
Assist the Right Decision System steering groups to
introduce best practice pathways for NHS Ayrshire and
Arran. 
December 2025 
Encourage collaborative work that promotes the interface
between Primary and Secondary care.        
Ongoing
Enable CDFs to carry out QI work relating to variations in
practice and resource management.
December 2025
Establish a Primary Care Teams Channel to collate
successful QI projects that could inform Steering Groups
and enable a learning by doing and economy of scale
approach to developing new pathways.  
June 2025
Engage with QI to determine whether VBH&C can
become an educational element of AAIFS.
September 2025
Explore use of Demand Optimization Dashboard for
Laboratory Diagnostic Tests with in Primary Care. 
December 2025
Support permanent introduction of Neptune Waste
Management System supporting National Green Theatre
programme.
September 2025 
Representation on Pharmacy Effective Prescribing
Groups. 
Ongoing 
Near Me Projects - Continued support/exploration of Near
Me projects within Breast, Preoperative and Cochlear
Implant services. 
Development of trials of Near Me within care home
settings, Tissue Viability Nurse service,
December 2025

Page 13

Neurodevelopmental Empowerment and Strategy (NEST)
Team and Rainbow House Child Development Centre. 
5. Women and Children’s Health 
Women’s Health Plan
NHS Ayrshire and Arran is committed to contributing to the outcomes outlined in the National
Women’s Health Plan for Scotland which underpins actions to improve women’s health
inequalities by raising awareness around women’s health, improving access to health care
and reducing inequalities in health outcomes for girls and women, both for sex-specific
conditions and in women’s general health. Actions to achieve this across Ayrshire and Arran
requires cross departmental and multi-agency support and action. The two leading
directorates for the strategic vision and delivery of this are Women and Children’s Services
and Public Health.
Building on previous activity, the Women’s Health Plan Strategic Oversight Group (WHP
SOG) was established in 2024, to deliver the ambitions of the WHP.  The group is co-chaired
between Women and Children’s Services and Public Health with representation from across
the Board to drive forward actions.
The ultimate aim of the women’s health plan is to improve the general health and wellbeing
of all women and girls, whilst reducing health related inequalities. The underpinning tenants
of Realistic Medicine and Value Based Health and Care will be integral to delivering
meaningful change and improvement for the population of Ayrshire and Arran. A new
iteration of the plan is expected in the coming years and will feed into the work of the WHP
SOG.
Moving into 2025/26 the priorities will be to continue to deliver against the NHS Ayrshire and
Arran Women’s Health action plan with the currently identified priorities of pre-conception
care, endometriosis, and menopause. We will continue to monitor and implement the
national Menopause and Menstrual Health Policy within NHS Ayrshire and Arran and
improve the support provided to our staff.  
It is recognised that there are nationally significant challenges for patients accessing
gynaecological appointments and laparoscopic surgery for the diagnosis and treatment of
endometriosis.  NHS Ayrshire and Arran recognise the challenges in providing access to
endometriosis care and surgery and the associated risks and recognise that endometriosis
is a progressive disease, and the current wait times increase the risk of the disease
becoming more complex, requiring more costly and specialist care.  
Work has been underway in 2024/25 to redevelop a cohesive pathway for Polycystic Ovary
Syndrome (PCOS) patients across both primary and secondary care services. It is expected
that this pathway will be presented to governance groups for approval in the final quarter of
2024/25 with a launch in early 2025/26 with ongoing monitoring of impact.

Page 14

Following on from this the next pathway which will be reviewed and improved is the
endometriosis pathway, including the creation of dedicated assessment clinics and
implementing patient initiated reviews. Waiting times for endometriosis assessment have
remained high and this action will seek to address some of the drivers of these long waiting
times. 
The women’s health academy seeks to create better training and competence within primary
care staff to be able to diagnose and manage women’s health concerns more robustly at
the point of presentation. This will not only improve the service provided to patients, reduce
demand on secondary care services but also promote career development for primary care
staff to be strong advocates for women’s health within their settings. 
During the period of time when families are planning a pregnancy they may not be in routine
contact with healthcare services, however this is a time when optimal health is important to
provide the best possible chance of a successful pregnancy. A board wide Short Life
Working Group will explore what information and support families need during this time and
how best to deliver this. 
Cardiovascular disease is often under-recognised and diagnosed in women. Early
identification and modification of risk factors can improve long term outcomes. Therefore a
test of change based within primary care services will seek to explore how CVD screening
can be delivered through routine appointments to begin the journey of early identification
and management. 
As we continue our journey towards supporting staff experiencing challenges associated
with menstrual health and the menopause a key priority for 2025/26 will be to establish a
network of Women’s Health Champions to provide staff support. The primary remit of this
network will be to provide peer based support to understand the support available within the
organisation, signpost to and provide training to staff and line managers and continue to
create a culture of openness and awareness. 
Health Visiting and Family Nurse Partnership 
The universal child health reviews are core to the Universal Health Visiting Pathway. The
reviews provide an opportunity to work with parents to assess children's wellbeing, provide
age-appropriate health promotion advice, build parenting capacity, identify needs for
support, and facilitate early access to effective interventions. Within 2025-26 all eligible
children will continue to receive child health reviews at 13-15 months, 27-30 months, and 4-
5 years from a qualified Health Visitor or Family Nurse, with ongoing review and assessment
of staffing across children's health services, to ensure assessments continue to be
completed by qualified HV/FNs.  Continue to work with partners to build on understanding
of wider determinants of health with regards to insecurity of income, housing and food across
the life course.   
There is extensive evidence on the benefits of breastfeeding on the short and long term
health of mothers and their babies. The percentage of babies who were exclusively
breastfed in 2023/24 at NHS Ayrshire and Arran level was 25.6% - that is the highest rate
we have achieved since the Pre-School Child Health Surveillance data has been published
since 2002/03. Breastfeeding initiation, exclusive breastfeeding rates at 11-14 days (first
Health Visitor visit) and at 6-8 weeks has increased at Ayrshire and Arran level and for each

Page 15

local authority area, with the exception of rates at 6-8 weeks in East Ayrshire. These positive
statistics demonstrate that the culmination of work we have been doing collectively across
midwifery, health visiting and family nurse services, including our specialist maternity and
community infant feeding teams, over the last few years is starting to build momentum. 
In addition, the significant investment made by the Health and Social Care Partnerships to
enable ongoing work with a third sector partner who provides mother to mother
breastfeeding peer support, is clearly contributing to this change. Over the last year, the
maternity service and neonatal unit at Ayrshire Maternity Unit achieved UNICEF Baby
Friendly reaccreditation and the health visiting and family nurse service achieved
reaccreditation with Gold Baby Friendly status. 
Public protection 
There is a well-established safeguarding team within maternity and neonates. However, it
has been identified that there is not a consistent approach throughout women and children’s
services as a whole.  To ensure a more robust approach a lead for public protection within
Women and Children’s Services has been identified to establish a consistent and robust
nonperson dependant approach within the women and children’s directorate. 
Maternity 
NHS Ayrshire and Arran continue to deliver on recommendations from the Best Start
national Policy to ensure women and their families have a positive experience of maternity
and neonatal care which takes account of their individual needs and preferences. It is
important that all families are aware of the support and choices that are available to them in
order that they can be partners in care and achieve the best outcomes for them.  Of the 76
Best Start recommendations we have seven remaining as still to meet locally and three of
these require Scottish Government input. 
We require support to progress further with key challenges around lack of recurring funding
for midwifery care, lack of community estate to deliver statutory maternity care in community
settings, a rise in morbidity for the care model and continuity of carer in the high-risk
pregnancies. The non-recurring funding for Best Start has now ceased. This will impact on
our ability to continue to implement recommendations, this issue exists for all health boards. 
Nationally there is a review of the impact on maternity in relation to the implementation of
the neonatal Best Start recommendations and locally we have commenced our own data
capture.  Locally community accommodation has been reviewed with no solutions agreed
and this is being further impacted by local distributed working arrangements and further
estate reduction.
Gynaecology 
We continue to develop and implement a Gynaecology Outpatient Procedure Unit for
patients requiring clinical interventions, which may have previously required a theatre
session and subsequent in-patient stay. This has been developed and will be implemented
within current estate in Ayrshire Maternity Unit in 2025. 
Paediatrics

Page 16

We will look at expansion of direct access to Paediatric Assessment Unit (PAU) for GP
referrals, negating any unnecessary time spent in Emergency Department (ED) for triage,
unless clinically required. Developing measurable outcomes will evidence compliance on
ED attendances after GP referral and 4-hour compliance from attendance at PAU to
discharge or admission.
To ensure on-going consistent exacting standards of high dependency critical care delivery
it is essential to support a planned programme of staff attendance in the recognised critical
care education. 
Neonates
Neonatal services, now a recognised local neonatal unit in keeping with Best Start
recommendations has well embedded criteria for admission in Ayrshire and transfer to the
tertiary unit in Queen Elizabeth University Hospital for delivery and then repatriation here as
appropriate. 
The Unit occupancy remains consistently in keeping with the required number of respiratory
care days, high dependency intensive care days and number of exceptionally low birth
weight babies cared for in the current recommendations for a local neonatal unit. 
Support with the on-going succession planning for the Advanced Neonatal Nurse
Practitioner team is acknowledged along with the recent approval of a sixth neonatal
consultant appointment. 
These on-going service developments and appointments will continue to enhance safe and
effective service delivery and sustainability. 
Aims/Objectives 2025-2026 (Year 1) KPI
Maternity Strategy (Best Start) – National review of
continuity of care model and sustainability of service
delivery.
National driver – local benchmarking 
assessment will be used to determine our 
RAG status as we progress.
Development of a Gynaecology (Gyn) Outpatient
Procedure Unit within Ayrshire Maternity Unit for patients
requiring clinical interventions, which may have required a
theatre session and subsequent IP stay.
Completion of planned moves, and uptake of
additional services including new colposcopy
suite.
Expansion of direct access to Paediatric Assessment Unit
(PAU) for GP referrals.
Scoping and service definition to be prepared
prior to implementation plan.
Deliver care in line with expectations for a ‘local’ neonatal
unit and in keeping with BAPMM guidance.
Data available from Badgernet system. 
Evaluation of implemented in-utero transfer 
form.
Staffing and competency for high-dependency (critical
care) beds.
Competency framework completion – 
determination of staff percentages completing
critical care academic training.
Ensure a robust approach to safeguarding that is
consistent across the Women and Children’s directorate.
Placement of Public Protection midwife and
associated delivery plan. 
Actions
2025-2026 (Year 1)
By When
Maternity - Progress national overview of continuity of care
model. 
March 2026
Maternity - Carry out a review to identify accommodation
for community midwives to deliver care.
October 2025

Page 17

Gynaecology - Forecasting of procedures to be transferred
from IP theatre list to Gyn OP procedure unit and impact of
waiting times.
December 2025
Gynaecology - Review of accommodation within Acute
Maternity Unit footprint and estates work required to
develop Gyn OP procedure unit.
August 2025
Paediatrics - Change the service model to negate
unnecessary time spent in Emergency Department for
triage, unless clinically required.
March 2026
Public Protection
Establish a lead for Public Protection within the
directorate.
Expand the approach current in Maternity and Neonates
towards consistency across the directorate. 
June 2025 
March 2026
Women’s Health Plan
- Launch revised PCOS Pathway;
- Review Endometriosis Pathway;
- Launch Women’s Health Academy;
- Establish a preconception SLWG to provide board wide
recommendations;
- Implement a test of change in primary care practice to
explore cardiovascular screening for women at routine
appointments; and 
- Recruit and train Women’s Health Champions to provide
a staff support network.
March 2026
East Ayrshire
- Implement the East Ayrshire’s Cherishing Our Families
Strategy and the Safe and Together model of practice;
- Improve holistic family support for children affected by
drugs and alcohol;
- Implement the Health Visiting Pathway and
Breastfeeding Friendly - Early Learning Scheme;
- Provide every child with the  access dental care and oral
health education/support;
- Support children and young people to access
neurodiversity supports;
- Provide access to training in mental health interventions; 
- Implement Trauma Informed Contact and Care; and
- Pilot Equally Safe at School resource (EA Violence
Against Women's Partnership). 
March 2026
Breastfeeding – Pan Ayrshire
• To implement the Breastfeeding Friendly Scotland
Early Years and Local Authority Schemes across
Ayrshire; and
• To continue to increase breastfeeding rates across
Ayrshire at the first Health Visitor visit and the 6-8
week Health Visitor visit. 
March 2026 
Ongoing 
6. Planned Care   
There is considerable overlap between planned care and cancer services and performance
measurement, and so we progress the planning of these two areas together. This plan
presents both the planned care and the cancer planning in order to avoid duplication. 
The Planned Care and Cancer Delivery Plan incorporate the “core” activity which can be
delivered by the available funding through the previously agreed Board allocation, in addition

Page 18

to the additional activity which has been commissioned through additional Scottish
Government funding in 2025/26. This additional funding totals £7.04M plus a further £1.65M
for mobile MRI scanners. The detailed plan associated with this funding is set out on the
Planned care planning template document. The plan assumes that discussions regarding
the Board’s financial position do not result in any adjustment to the allocation of planned
care funds.  
Planned Care
As we move into 2025/26 we recognise a number of significant challenges to the delivery of
planned care.   
The steady increase in urgent care demands continues to result in planned care capacity
being reduced with increasing workforce resources re-assigned to support urgent care
needs. 
The proportion of referrals into planned care being made on an Urgent Suspicion of Cancer
and Urgent basis has increased significantly. The result is that much less capacity remains
for routine-priority cases which generally represent the longest waiting patients. It also
places significant pressure on the cancer pathways which are required to manage much
larger volumes of referrals with minimal increase in the number of cancers diagnosed. 
The Board continues to face significant recruitment challenges. This includes a number of
clinical specialties with notable numbers of long standing consultant vacancies, particularly
in some of the medical specialties. 
There remain some facility-based constraints which arose as a result of changes made
during the COVID-19 pandemic, which have not since been possible to reverse. In particular
the loss of the UHC day surgery unit, and recovery area for endoscopy are notably reducing
the operating theatre and endoscopy capacity and productivity.
Cancer
NHS Ayrshire and Arran’s key priorities reflect the vision and priorities set out in the Scottish
Government’s Cancer Action Plan 2023 to 2026 to improve cancer survival and provide
excellent, equitably accessible care to all.  The aim is to ensure that people living with
cancer, their families and carers are at the heart of cancer services, and a focus on reducing
inequities in access to cancer care and cancer outcomes, recognising each person’s time
of need. 
However, there are a number of challenges faced in the delivery of cancer services. There
has been a sustained increase in demand, with a significant increase in the number of
Urgent Suspicion of Cancer referrals. This places significant additional demand on the
diagnostic parts of the pathway required to diagnose cancer pathology. The actual number
of cancers diagnosed has risen, but by a smaller amount. 
There is a particular capacity challenge in relation to the prostate cancer pathway, with the
most significant shortfall relating to operating theatre capacity for robot assisted surgery. It
is also anticipated that there will be a significant increase in demand for both the diagnostic
and treatment elements of the prostate cancer pathway during 2025/26 resulting from the
impact of a recent high-profile prostate cancer case.

Page 19

Diagnosis of cancer is becoming an increasingly sub-specialised area. As a result there are
capacity based bottlenecks for certain cancer pathways within Pathology and Radiology in
particular. 
Within radiology, there is a capacity constraint impacting the cancer service in relation to
MRI and ultrasound. The National Plan for imaging is expected to address the ultrasound
aspect, but there will remain a capacity shortfall for MRI. 
Diagnostic capacity in endoscopy related to the reduced recovery facilities at UHC impact
the upper GI and Colorectal pathways.
There are significant challenges with West of Scotland oncology capacity, and also capacity
for PET scanning. 
A number of cancer pathways have identified unfunded shortfalls in consultant capacity.
Against this backdrop the Board will prioritise work which further progresses the five main
areas of focus: 
1) Understanding the changing service demand and capacity
• Through 2024/25 additional DCAQ analysis has provided further insight into particular
areas of pressure. All individual specialties have either completed or are in the
process of updating DCAQ analysis; 
• Consultant job planning, including the use of the Allocate job planning system for the
first time in NHS Ayrshire and Arran, will further support this work but allowing a much
clearer identification of core capacity and will support development of tools to monitor
delivery of clinical activity against the expected levels;
• We have also completed a review of theatre (nursing capacity) in order to better
understand the capacity and workforce shortfalls in this area, and further discussion
will progress consideration of this outcome within the available funding envelope; 
• We will develop an online referral guidelines portal using the Right Decisions
Platform. This tool will be co-produced between primary and secondary care and is
expected to positively impact on ensuring that the right patients reach the right
service, first time; and
• We will review our robot assisted surgery capacity, particularly in relation to capacity
for prostate cancer surgery, and will participate in ongoing regional and national work
to identify opportunities to increase surgical capacity to improve the prostate cancer
pathway. 
2) Productivity and Efficiency Opportunities
• Close monitoring of theatre utilisation continues to be a feature of “business as usual”
within the Board, and this is evidenced through the strong theatre utilisation
performance data. We plan to introduce the national theatre scheduling solution in
2025/26 and will closely monitor the impact that this has on both utilisation and
productivity; 
• Through the newly created “outpatient utilisation group” we will review and progress
initiatives to further increase efficiency and productivity through setting local targets
and action planning to improve DNA rates and reduce Review:New ratios; and

Page 20

• We will ensure that our waiting lists are up to date with an ongoing in-house
programme of outpatient waiting list validation, and through bi-annual validation of
the IP/DC waiting list through the established National Elective Coordination Unit
(NECU) process. 
3) Modernisation
• In 2024/25 we held 2 “summit events” which supported our clinical teams to focus on
opportunities to modernise their planned care services. Following on from that we will
support the teams in the further expansion of Active Clinical Referral Triage (ACRT)
and Patient Initiated Review (PIR) through a programme managed approach; 
• Implementation of the Ophthalmology Open Eyes system is expected to support more
patients being managed within the community setting, and a reduction in demand for
the acute service;
• Implementation of the Digital Dermatology Service is expected to support a reduction
in demand through improved referral information. Subject to continuation of funding,
we anticipate that this development will run in parallel to a NECU-led campaign using
the same technology which will also enable mutual aid support from other NHS
Scotland Boards to NHS Ayrshire and Arran in order to reduce the dermatology
backlog; 
• We will develop an online Referral Pathway guidance portal which we anticipate will
lead to improved appropriateness of referrals, ensuring that patients reach the right
service first time. This may also contribute to reducing the increase in referral demand
both for general referrals and for urgent suspicion of cancer referrals. Within the
cancer pathways in particular, reducing overall demand and so enabling faster review
and diagnosis we anticipate that this will positively impact on cancer stage of
diagnosis;
• We will work towards implementation of optimal cancer pathways in the lung cancer,
head and neck cancer and colorectal cancer pathways subject to the availability of
the necessary resources and funding; 
• We will continue to deliver a Rapid Cancer Diagnostic Service, subject to continuation
of funding; and
• We will use QPI data to drive further improvement in cancer care and outcomes,
coordinated through our new Cancer Management Group. We will focus on specific
priority QPIs, namely Upper GI QPI11 by exploring the opportunity to identify cancers
at pre-symptomatic endoscopies using available technology, Melanoma QPI6 and
QPI7 by reviewing the pathway and improving the process for notification of
melanoma diagnosis. 
4) Investment in Sustainability
• Significant recurring investment of Access funding has already been targeted at
orthopaedics, endoscopy and CT scanning services, and additional investment
during 2024/25 prioritised Anaesthesia, Urology and Diabetes and Endocrinology. 
• Additional areas for recurring investment have been agreed and will be implemented
in 2025/26 including ENT surgical staffing, Neurology medical staffing,
Gastroenterology multidisciplinary team, Breast Radiologist and operating theatre
nursing. Additionally additional Orthopaedic surgeon staffing which had previously

Page 21

been put in place non-recurringly has now been allocated recuring funding by Scottish
Government subject to delivery of agreed additional activity. 
• We will work locally, and with regional colleagues to develop plans for sustainable
delivery of oncology and SACT services. This will include development plans for the
establishment of safe and appropriately sized oncology ward facilities within the
Board, as well as supporting regional development of a Target Operating Model for
Oncology. We will continue to further develop local SACT capacity through workforce
diversification and expansion where funding allows. 
5) Tackling Long Waits
• We will continue to target the longest waiting patients, where capacity allows and
within the context of relevant clinical prioritisation. The longest waiting TTG patients
will be tracked individually with action plans developed for each; 
• Short term additional capacity to address the longest waiting patients will be put in
place in line with agreed Scottish Government funding plans. This includes
recruitment to additional fixed term posts in General Surgery and Orthopaedics.  This
will also include contracting of independent sector capacity and waiting list initiative
type approaches; 
• There has already been considerable investment to reduce waiting times in
orthopaedics. The development of a business case for development of a National
Treatment Centre outlined the requirement for further investment in service and
capacity in order to manage demand, and although this particular project has been
paused, we will continue to engage with Scottish Government colleagues to consider
how this significant capacity shortfall can be addressed, and we will actively
participate in the development of an Orthopaedics National Plan; and
• Recognising that ophthalmology and gynaecology are two other areas of national
priority, and that we have some waiting list challenges in these areas, we will seek to
identify opportunities to establish additional capacity as funding allows but
recognising also that NHS Ayrshire & Arran has a number of other waiting times areas
of particular high priority, most notably within some outpatient specialties.
Prioritisation of resources will reflect the respective level of risk and challenge. 
Aims/Objectives 2025-2026 (Year 1) KPI
Address Long Outpatient waiting times working towards
target of no patients >52 weeks by March 2026.
WL Size = 42436
>52 Wks = 3713
Address Long Inpatient/Daycase waiting times working
towards target of no patients >2yrs by March 2026.
WL Size = 6554
>52 Wks = 631
Reduce waiting times for Medical Imaging Investigations
working towards maximum 6 week wait by March 2026.
WL Size = 2041
>6 Wks = 355
Reduce waiting times for Endoscopy working towards
maximum 6 week wait by March 2026.
WL Size = 1047
>6 Wks = 613 
Actions
2025-2026 (Year 1)
By When

Page 22

Increase planned care productivity in outpatients and
inpatients/daycases through a range of different actions.
March 2026
Optimise opportunities for regional working and mutual aid
through implementing a number of individual initiatives.
March 2026
Implement new digital solutions including Ophthalmology
Open Eyes, Digital Dermatology and Theatre Scheduling
tool.
March 2026
Deliver supplemental activity, in line with funding plan March 2026
Implement the initiatives supported by the National Plan
for Imaging.
March 2026 
6.1  Cancer 
Aims/Objectives 2025-2026 (Year 1) KPI
By Dec 2025 82% of all those urgently referred with a
suspicion of cancer are to begin treatment within 62 days
of receipt of referral.
82%
From March 2025 98% of all patients diagnosed with
cancer are to begin treatment within 31 days of decision to
treat.
98%
Identify and address areas of lower performance or clinical
concern through representation at WoSCAN Regional
Groups and continued engagement with local and regional
clinical leads.
Identified and addressed areas of lower
performance or clinical concern.
Support the development of a Target Operating Model for
oncology, and work across the region and locally to
address shortfalls in oncology capacity.  
Development of a Target Operating Model for
Oncology
Ensure earlier and faster diagnosis at stage I and II in line
with Cancer Strategy.
Earlier and faster diagnosis at stage I and
stage II 
Actions
2025-2026 (Year 1)
By When
Ensure sufficient diagnostic capacity to support cancer
pathways, through implementation of a range of actions.
March 2026
Use QPI data to focus on and address particular shortfalls
in cancer pathways.
March 2026
Support the development of a Target Operating Model for
oncology, and work across the region and locally to
address shortfalls in oncology capacity
March 2026
Ensure focus on achieving faster and earlier diagnosis
through implementation of optimum cancer pathways and
other actions.
March 2026 
6.2 Musculoskeletal Health 
Musculoskeletal (MSK) conditions continue to be one of the leading causes of sickness
absence across Scotland and constitutes 30% of the primary care demand.  With increasing
demand and complexity of presentation there is acknowledgement that the MSK Service
needs to develop new models of care to better support citizens to access the right care in

Page 23

the right place at the right time.  A key priority of the service in delivering this goal is
development of a digital platform to enable patient initiated access and supported self-
management.  This would also bring benefit to primary care and unscheduled care services. 
The development of a digital platform would enhance the existing digital resources already
in place within the service with the Ayrshire and Arran MSK website and social media already
having good engagement.  The community appointment day (CAD) model is another service
development which is seen to be key in better supporting patients in a more timely manner
while improving access to the service.  In delivering new models of care the expectation is
that the performance against the 4 week waiting target improves in line with the national
average.  
Aims/Objectives 
2025-2026 (Year 1)
KPI
Increase compliance with national MSK 4 week waiting
time target
Improve percentage compliance with 4 week
waiting time target to 40% by December 2025
across Physiotherapy, Occupational Therapy
and Podiatry MSK services.
Develop new models of care which support management
of demand into MSK Services 
Increase website engagement by 20% by
December 2025.
Facilitate recruitment and retention of MSK workforce 100% of staff have a job plan relevant to their
job role by June 2025. 
Introduce and recruit to MSK podiatry
development post by December 2025. 
Actions
2025-2026 (Year 1)
By When
4 week waiting time target
• Develop MSK Performance Measurement Plan
• Test texting patient with invite to treatment to enable
patient focussed booking
• Review of MSK conditions where Active Clinical
Referral Triage (ACRT) has been implemented and
expand to other presentations if able 
• Routinely use MSK HQ outcome measure at entry and
exit from service
• Review of MSK referral and vetting guidance
• Test early intervention clinic within South locality and
assess impact on waiting times with a view to
replicating in East and North 
August 2025
August 2025 
December 2025 
March 2026 
June 2025
August 2025
Develop new models of care which support
management of demand to MSK Service
• Test texting patients with self-management advice
while on the waiting list
• Review MSK website content and update where
clinically required, improve health literacy, fix broken
links, inclusion of printable content
• Refine and further testing of Community Appointment
Day model including hosting events in the North and
South
• Robust training and education programme developed
for referrers to service 
• Develop digital patient initiated referral platform for
MSK Service 
December 2025 
October 2025 
August 2025 
March 2026 
March 2026

Page 24

• Utilisation of Community Assets including engagement
with primary care; and increased targeted education
group clinics.
December 2025
Facilitate recruitment and retention of MSK
workforce 
• Review current clinical supervision arrangements
ensuring all staff have access to clinical supervision to
support staff wellbeing
• Embed and further develop development roles within
service to ensure resilience and succession planning
• Review of skill mix within the service including health
care support worker role
• Embed a robust MSK education programme for all
staff with collaborative delivery across all MSK teams
• Collaboratively deliver practice education placements
to reduce duplication and enable peer support for
students  
• Implement job planning for all staff within the service
• Progress a review to understand the factors currently
impacting on recruitment and retention of MSK
Physiotherapy staff 
September 2025 
March 2026 
March 2026 
December 2025 
March 2026 
June 2025
April 2025 
7. Unscheduled Care 
NHS Ayrshire and Arran has taken a ‘People First’ approach to aligning the unscheduled
care priorities and operational guidance through a recovery and reset programme of work
through Quarter 4 of 2024/2025.  This work focussed on immediate, short term and long
term plans to drive improvements on:
• Unscheduled care performance metrics;
• Quality of care;
• Patient safety; 
• Staff safety, morale and engagement; and
• Culture. 
It was acknowledged and recognised throughout the reset programme that we need to
‘break the cycle’ by carrying out a full reset of processes to support empowering staff to
deliver high quality care for all of our patients across our front doors and ward areas.
The Unscheduled Care Delivery Plan and improvement actions have been written from the
perspective of a refreshed approach across the whole patient journey to support the ‘right
care right place’ principles.
The plan outlines that we need to take forward a radical organisational journey of change
which requires high impact changes to support performance and quality of care.  This
programme of work also includes actions to support culture change and improve staff
engagement.  These plans fully align to the focussed piece of data and improvement work
carried out by the Centre for Sustainable Delivery in 2023 and throughout 2024.
The ‘People First’ initiative focused on three areas of change whilst supporting a financial
recovery programme and the ambition to drive best practice.  These are noted below in more
detail.

Page 25

1. Leadership
A senior leadership group was set up, over and above the existing unscheduled care
governance structure, to support the reset and recovery plan for Q4. This has ensured
executive level commitment along with enhanced oversight and governance arrangements
to drive and monitor the unscheduled care remedial actions to support the improvements at
both hospital sites.
The commitment to an open and transparent leadership approach was critical to support the
‘People First’ reset with a focus on improving culture and performance whilst balancing
quality and safety with front door overcrowding and consistent high occupancy on ward
areas.  The launch of the ‘People First’ reset has focused on zero tolerance to corridor care,
improving ambulance offloads and eradicating full capacity utilisation to support the
wellbeing of staff and the dignity of our patients.
2. Function
Flow
The development and governance to oversee the implementation and delivery of operational
strategies focused on reducing the front door overcrowding and performance. In depth
reviews were undertaken of the overcrowding across both sites.  Site wide processes have
been fully reviewed which has enabled an evidence based analysis of flow within areas of
the emergency care footprint, Scottish Ambulance offload delays, corridor care and flow
through the hospitals. 
The review of the site wide processes and gaps in process have been developed into a
detailed action plan across all divisions and areas.  These actions will support continuous
flow improvement which feeds into the reset and recovery plan for performance with the
ambition to improve our patients’ journeys through the acute sites.
A series of system-wide Multi-agency Discharge Event (MADE) took place over two weeks
followed by a two week recovery cycle with ward sponsors to support optimising discharges
and reducing bed occupancy through the Criteria to Reside process.  The learning from
these events has also informed the current detailed action plans.
Frailty Assessment Units
The frailty assessment units were mobilised at both hospital sites in November 2024, with
capacity to support patient flow, admission avoidance with Multi-disciplinary Team (MDT)
led board rounds. 
The initial 4 weeks evidenced 33%+ same day discharge. However, this has been impacted
with 12% same day discharge due to the restricted flow and productivity through the units
due to the site wide high occupancy due to the recent Winter unscheduled care demand.  
Monthly monitoring will continue through the reset and recovery process.
SAFER
Phase 1 of a SAFER ‘test of change’ - Senior review of all patients, supporting Flow and
Early discharge, supported by MDT Review) has been implemented at the University
Hospital Crosshouse site.  The first phase has evidenced a 2.5 day reduction in the LOS for

Page 26

two orthopaedic wards.  Quarter 4 of 2024/25 will continue with the embedding of the SAFER
board rounds. 
Phase 2 will commence in Quarter 1 of the 2025/2026 where the SAFER boards will be
expanded to other wards to support MDT input to reduce Length of Stay (LOS). 
Phase 2 will also include the replication of the SAFER process to commence at the
University Hospital Ayr site which will be initiated with the same training and workshops that
took place at the University Hospital Crosshouse site.
Length of Stay 
Site huddles have had a greater focus on LOS in the Emergency Department and initial
assessment units which has led to a new huddle process being implemented to support the
decompressing of the front doors through continuous flow. 
Weekly, long length of stay reviews on the wards have commenced at the University Hospital
Crosshouse site led by the Associate Medical Director for the site using an MDT approach. 
The challenge shared across the board is workforce challenges to support patient
discharges with higher packages of care and an improvement workstream to focus on
patients with delirium in the discharge process.
The weekly long length of stay review process will be implemented at the University Hospital
Ayr site during Q4 of 2024/25.
Measurement
The digital development needed to support the flow processes for unscheduled care has
been recognised as a priority area to progress to support live/same day data dashboards to
measure continuous flow and daily board rounds. This will be delivered in Q4 of 2024/2025. 
This will be an evolving area with service driven digital developments.  This will further
support the culture change journey to share progress on performance and quality with all
staff evidencing ‘good news stories’ on their hard work.
Best Practice
The engagement with staff through focus groups, wider engagement and workshops has
supported the ‘People First’ process with a refresh of roles, responsibilities and
accountability across the acute sites. 
This includes a review of job planning across the medical workforce and a review of what
resource is required to support 7 days working.
The education and coaching to support best practice processes, SOPs and board rounds to
enable optimal flow across both sites forms part of the enablers needed to deliver the
2025/2026 Delivery Plan to provide a resilient workforce across the acute sites.
The narrative outlined above and the delivery plan outcomes and objectives below and in
the spreadsheet builds upon the reset and recovery which has been mobilised through
2024/2025 through the ‘People First’ process and plans. 
Aims/Objectives 2025-2026 (Year 1) KPI

Page 27

Improve overall ED 4hr compliance (both unscheduled and
scheduled attendances) 
To at least 80% by March 2026
Reduce time in Emergency Department  New metric to be measured:
Time to Initial Assessment within 15
minutes = 70% compliance by March
2026 
Reduce LOS in ED (daily average)  = 17
by March 2026         
Reduce 12 hour breaches = 10 by
March 2026
Improve Ambulance handover times and hours lost  72% within 60 minutes by March 2026
Reduce SAS conveyances using alternative pathways 6% reduction target by March 2026 
Increase >65s discharged from CAU : 
LOS<72 hours  68%
Reduce total delayed discharges for all 3 partnerships <95 by March 2026
Frailty assessment and flow  Same day discharges 50% by March
2026
Reduce bed occupancy and LOS 20% reduction in geriatric LOS and 
20% reduction in acute hospital LOS 
Reducing length of stay over 14 days  No of patients non-delay LOS >14 days 
Reducing length of stay for those aged over <65 and >85  20% reduction in geriatric LOS and 20%
reduction in acute hospital LOS 
Develop automated digital site sitreps for circulation 3 times a
day, 7 days per week 
To be scoped – Quarter 1
Develop live digital dashboard for ED performance from
Symphony and TRAKCARE 
Quarter 2
Allied Health Professionals
Contribute to the delivery of Caring for Ayrshire models of care
in relation to reablement, end of life care and frailty. 
Improve care pathways providing the right care, from the right
person at the right time. 
Funding and targets to be agreed. 
Increased activity through frailty
assessment units at both sites. 
Reduced LOS for palliative patients and
frailty patients  across both sites
supported by 3 IJBs community 
provision and access to community
beds. 
Action
2025-2026 (Year 1)
By When
Identification of further triage space/changes to environmental
structures within the Emergency footprint to support timely
patient assessment.
Quarter 1
Reset of CAU processes and twice daily board rounds  Quarter 1

Page 28

Implement 2 hourly huddles to support list reviews and
escalations.
Quarter 1
Develop redirection model and pathways Quarter 2
Development of Bed management standard operating
procedures with roles and responsibilities redefined.
Quarter 1
Refresh of Escalation/OPEL framework and action trigger
cards for acute sites and community.
Quarter 1
Continuous flow moves to support timely placing of admitted
patients.
Quarter 1
Proactive planning by emergency department and bed
management team to support ambulance activity and expected
demand in community through continuous flow.
Quarter 2
Embedding of ambulance escalation process and joint
responsibility for handovers and Scottish Ambulance Service
responsibility for timely handover
Quarter 1
Increase weekend discharges from CAU and Medicine Quarter 1
Scope alternative pathways to support patient centric care at
home i.e., palliative care pathway, Homefirst pathway.
Quarter 2 - Completion Quarter 4
SAFER implementation on both sites to deliver daily MDT board
rounds, supported by a digital solution to capture outcome data.
Phased through both sites over  2025/26
Completion 2026
MDT Whole system LLOS reviews and CTR meetings. Quarter 1
Medical workforce review to drive 7 day board rounds to
optimise discharges and reduce bed occupancy.
Quarter 1 
Allied Health Professionals
- Develop Multidisciplinary Teams and robust care governance
arrangements to enable issue identification, escalation and
resolution;
- Develop practice development tools and techniques  to
support innovation, change and excellence;
- Ensure effective information sharing across systems, to
support positive outcomes for supported people; 
- Develop targeted  responses  to reduce the need for specialist
level interventions; and
- Develop points of access for support, advice and requests for
assistance, including advice lines, physical, digital drop-ins
and clinical.
Completion of acute AHP review and
proposal for change agreed and
enacted by June 2025. 
Digital solution to support data capture
from referral to completion to be scoped
and implemented by late Summer/
Autumn 2025 including development of
an AHP digital dashboard. (Subject to
approval of the Acute AHP review and
subsequent proposal, and subject to
investment outlined in the Digital
Strategy).
Review and develop a whole system
approach to improve patient care and
flow across the acute and community
interface by Winter 2025.

Page 29

7.1 Delayed Discharges 
Shifting the balance of care is an objective for all of our services and for everyone we
support: from childhood to old age. For older people’s services, a key priority that requires
concerted effort is bringing down delayed discharges. A delayed discharge is defined by
NHS Services Scotland as “a hospital inpatient who is clinically ready for discharge from
inpatient hospital care and who continues to occupy a hospital bed beyond the ready for
discharge date”. Reducing delays in discharge from hospital matters for many reasons, but
most importantly it is almost never an appropriate place for someone to be if they no longer
need hospital care. Time spent in hospital when medically fit is an unnecessary risk to health
and welfare, involving risks such as hospital acquired infection and loss of mobility. 
We will continue our focus on bringing down delayed transfers of care, to get people to the
right place for their care needs in Ayrshire and Arran with constant oversight of local
performance. Improvement actions for 2025/26 include the continuation of Weekly Delayed
Transfers of Care (DTOC) meeting, involving all partners in order to ensure services are
allocated to areas of priority. There are a number of working groups looking at double
handed care packages with a view to increasing capacity in a way that is safe for patients
and staff.  Ongoing recruitment with a communications plan in place for recruitment and
retention of care staff. 
Aims/Objectives 2025-2026 (Year 1) KPI
Delayed Discharges
Reduce the daily average number of occupied bed days
due to a delayed discharge.
By March 2026
East Ayrshire - 27
North Ayrshire - 99
South Ayrshire - 92
Delayed Discharges
Reduce the number of people experiencing a delay of any
length or reason in discharge from hospital at the monthly
census point.
By March 2026
East Ayrshire - 33
North Ayrshire - 99
South Ayrshire - 80 
Actions
2025-2026 (Year 1)
By When
East Ayrshire HSCP
• Ensuring a Home First approach across services and
pathways;
• Service-wide implementation of reablement; and
• Implement recommendations from IJB Report on East
Ayrshire Community Hospital. 
March 2026
North Ayrshire HSCP
• Maximise capacity and ensure efficient utilisation of
care at home capacity to support discharge from
hospital including the enhancement of reablement
supports in the community;
• Ensure robust systems are in place for the
management and oversight of complex social work
assessments; and
• Utilise a Homefirst approach and ensure discharge to
assess principles are embedded across Health and
Social Care Teams to ensure good discharge planning
for people leaving hospital. 
March 2026

Page 30

South Ayrshire HSCP
• Recruit an additional 40 carers despite the financial
challenges;
• Maintain care home numbers despite the financial
challenges;
• Reduce the number of double handling care packages
to maximise the spread of care at home;
• Maximise the use of step up and step down beds in
RRICU; and
• Further streamline referral and discharge planning
processes for both simple and complex discharges
including guardianships. 
March 2026 
8. Urgent Care 
The new pathways introduced through the Redesign of urgent Care (RUC) programme
delivered by the Ayrshire Urgent Care Service (AUCS) has continued to help attract and
retain the clinical workforce to sustain rotas for the 24/7 urgent care service in NHS Ayrshire
and Arran.  The Flow Navigation Centre (FNC) provides rapid early triage and clinical
assessment of patients to identify the most appropriate pathway for their care which is
provided to people closer to home wherever possible and avoid an acute attendance.  This
includes appointing patients directly to their local Minor Injuries Unit or alternative community
based service. 
Various other pathways are also embedded within AUCS supported by the FNC including a
Call before Convey pathway with Scottish Ambulance Service (SAS). This allows SAS crews
to liaise with a senior clinician in the FNC for supported decision making on alternative care
options to help keep patients within their own home where appropriate.  This pathway works
alongside our professional to professional lines for Care Home and Community Pharmacy
staff to be supported in relation to clinical decision making ensuring the best outcomes for
patients. It also enables patients to be treated/managed within care homes and avoids
unnecessary presentations within the healthcare system and by utilising the Pharmacy First
Scotland pathway.  
The Ayrshire Palliative Urgent Care Service was introduced in June 2024 as part of the
AUCS FNC. This service improves access to District Nursing Services 24/7 for all patients
living in Ayrshire and Arran who are approaching the last few weeks of their life and support
for their families.  Since June, 94% of patients have remained in their preferred place of
care. This model will continue to be developed and embedded within the FNC during
2025/26. 
Aims/Objectives 2025-2026 (Year 1) KPI
Ayrshire Urgent Care Service (AUCS) – at least 85% of
patients who contact AUCS will not require attendance at
the front door and will receive alternative pathways of care
in the right place, at the right time.
85%
Create a virtual capacity network by developing a SPOC
through Ayrshire Urgent Care Service (AUCS) Flow
Seamless pathway to all services for patients.

Page 31

Navigation Centre (FNC) to encompass the Hospital at
Home, Community Rapid Respiratory Response (RRR)
programme to ensure a seamless pathway to all services
for patients.
Maintain the FNC community pathways and explore all
opportunities as they arise to enhance the service.
Enhanced FNC Community Pathways
Develop and embed a community nursing based model for
specialist care by supporting palliative patients and families
who are within their last four weeks of life within Ayrshire
and Arran during the Out of Hours period.
A community nursing based model for
specialist care to support palliative patients
and families who are within their last four
weeks of life within Ayrshire and Arran during
the Out of Hours period. 
Actions
2025-2026 (Year 1)
By When
Develop and embed a referral pathway from AUCS FNC to
Hospital at Home Team.
March 2026
Develop a referral pathway from AUCS FNC to RRR
Service.
March 2026
Implement organisational change for RRR and Hospital at
Home operational staff to bring them under the SPOC
model.
March 2026
Scope potential for Ayrshire Community Blood Service
(ACBS) to be encompassed within the SPOC.
March 2026
Maintain and grow AUCS/FNC pathways with Senior
Clinical Decision Maker oversight including appointing to
MIU.
March 2026
Continue to look for reductions in palliative patients being
admitted to hospital who have noted home as their
preferred place of care through ongoing data collection. 
Evaluate responses from patient / family questionnaires to
provide insight into the service and identify any
improvements.
March 2026 
9. Primary and Community Care 
Delivery of safe and effective healthcare provision is a priority for all services to ensure our
citizens can access the right care in the right place at the right time. Relationships with
service providers across the whole of Ayrshire and Arran, including all Primary Care
Independent Contractors, SAS, Mental Health teams and acute services, continues to be
strengthened to ensure provision of priority care. The efficient handling of demand by in-
hours Primary Care services has enabled Urgent Care to be accessible to those with the
most urgent need. 
Delivered by Ayrshire Urgent Care Service (AUCS), delivery of primary urgent care during
the out of hours (OOH) period is a robust well embedded service within NHS Ayrshire and
Arran.  The team continue to utilise and maximise any opportunity to further review and
enhance the service linked to activity and patient outcome data.  AUCS continues to test
new models of delivery using Advanced Nurse Practitioner models and wider MDT services
(e.g. District Nursing, Social Work Services, Emergency Mental Health Crisis Team, and
Advanced Paramedics).

Page 32

A programme for annual review of General Medical Services (GMS) Contracts has been
developed and due to be implemented by the primary care team to review practice operating
models, quality indicators (including chronic disease management) and identify any
improvement work. This will enhance oversight of core service delivery by the Board and
help to early identify any issues or additional support GP Practices may need to sustain
service delivery. 
A project is underway to enable the set-up of the national Community Glaucoma Scheme in
Ayrshire and Arran. This scheme will enable stable Glaucoma patients to be transferred
from acute to community optometry practices for their continued care.  Meetings are taking
place to aid the roll out of the Open Eyes system that will be used to manage the sharing of
patient information from secondary care to primary care providers. The local shared care
scheme for Glaucoma patients will continue to ensure wait times are minimised for stable
glaucoma patients.  We are aiming for a full transition by September 2025.
NHS Pharmacy First Scotland is a national service delivered from community pharmacies
where citizens can access healthcare advice, treatment and/or referral to other healthcare
services without an appointment. The number of consultations by community pharmacy
through Pharmacy First Scotland increases year on year which otherwise would have
occurred in another part of the primary and unscheduled care system.  The addition of
independent prescribers allows pharmacies to offer the Pharmacy First Plus service which
includes assessment and treatment of acute common clinical conditions which is beyond
the scope of the standard Pharmacy First service. 53% of 97 community pharmacies across
Ayrshire and Arran offer this enhanced service which reduces the need for onward referral
of patients to other healthcare providers even further. The pharmacy team are supporting to
train additional pharmacies to become independent prescribers which will facilitate
expansion of the Pharmacy First Plus network supporting more patients access care from
the right professional for their need as close to home as possible.
An Urgent Care Test of Change within Ayrshire Urgent Care Service (AUCS) continues to
be rolled out and evaluated working alongside General Practice. This supports local
practices with home visits between 3.30pm and 5.30pm. This was developed recognising
the impact on access within General Practice when patients present late in the afternoon
with an urgent care need requiring a house visit. Rolled out on a phased basis, this model
now extends to 44 of 53 GP Practices with the aim to extend to all Ayrshire Clusters by April
2025. Feedback from participating practices has been positive reporting that clinicians can
focus on planned appointments without the worry or stress they will be required to attend a
last minute house call.
NHS Ayrshire and Arran were successful in a recent bid to be a Primary Care Phased
Investment Programme (PCPIP) Demonstrator site to work with the Scottish Government
and NHS Health Improvement Scotland (HIS). Having commenced in April 2024,
Demonstrator sites will be supported to work at pace and use improvement methodologies
to fully implement elements of the 2018 GMS Contract, focussing on Pharmacotherapy and
CTAC services locally. It seeks to understand the impacts for people, the workforce and the
healthcare system with the key aims to improve patient outcomes. Data will be collected and
utilised to model full national implementation of priority areas of the GMS 2018 Contract.
Development work will also continue alongside this to further embed MDT teams into

Page 33

practice through the GMS Contract, which would continue in tandem with the focussed work
on Pharmacotherapy and CTAC.
An Oral Health Needs Assessment was undertaken by Public Health alongside scoping on
the vision and strategy for dental services across Ayrshire and Arran. A delivery plan will be
presented to NHS Ayrshire and Arran Corporate Management Team for endorsement which
sets out the short, medium and long term goals to improve access to dentistry.  
Oral Health Improvement is a key priority across Ayrshire and Arran. The Oral Health
Improvement Team continue to strengthen links within the community, delivering local
training programmes, educating the population on good oral health practice, with a priority
on prevention and providing support for local groups and events. The team deliver training
and interventions for priority groups following recognised national oral health improvement
programmes such as Childsmile. The OHI programmes are tailored to individual needs of
the population within each of the priority groups. 
Aims/Objectives 2025-2026 (Year 1) KPI
Ensure GMS Enhanced Services meet the needs
of the patient population.
Review, develop and identify priority
enhanced service specifications.
Enhance digital telephony within General Practice and
move to a single resilient digital telephony platform to
enable telephone queuing systems
and increase the number of lines into practices.
All interested practices surveyed and costed
up with 
90% of these practices transferred over onto
the HB system by the end of year 2025-26. =
40 practices complete.
Deliver the Primary Care Phased Investment Programme
(PCPIP) to demonstrate what a model of full
implementation of the MDT can look like, focussing on
CTAC and Pharmacotherapy Services.
Continue to progress actions towards the key
deliverables.  
Further embed and explore all opportunities to expand the
wider MDT roles aligned to the GMS 2018 Contract which
are not included within the Phased Investment
Demonstrator Site programme.
Expansion of the wider MDT roles aligned to
the GMS 2018 Contract.
Improve access to NHS dentistry to ensure a sustainable
and equitable delivery model which supports the oral health
needs of the local population.
Improved access to NHS Dentistry.
Increased shared care, access to service and patient
experience within community Optometry.
Community Glaucoma Service (CGS) and
Juvenile Idiopathic Arthritis (JIA) service to
community optometry implemented within
NHS Ayrshire and Arran. 
Continue to roll out and embed an urgent care pathway for
General Practice to refer patients for clinical care and
treatment during the out of hours period.
Fully deliver the model and embed within
AUCS as Business as Usual. 
Actions
2025-2026 (Year 1)
By When
Embed a programme of annual reviews for GP Practices to
review:
- Practice operating models;
- Quality Indicators; and
- Identify any improvement work
March 2026
Programme of review of Enhanced Services and work with
wider clinical services to ensure joint up approach within
Caring for Ayrshire agenda.
March 2026

Page 34

Phased transfer of GP Practices onto new Board platform. 
Digital team to link with line providers to progress timeous
transfer of lines from practices.
40 practices complete by the end of year 2025-
26. 
Primary Care Phased Investment Programme (PCPIP) 
- Expansion/development of the CTAC resilience model
and Pharmacy Support Worker team;
- Continuation and further development of the Primary
Care Practice Educator role;
- Audit of demand and activity to capture reliable, ongoing
data around CTAC activity at both GP practice and
HSCP level;
- Undertake a review of the CTAC skill mix and practice
allocation and define roles in both CTAC and
Pharmacotherapy;
- Ensure standardised processes; 
- Expansion of pharmacy hub; 
- Test of concept/impact - Advanced Pharmacist
Practitioner; and
- Evaluate impact of a preceptorship programme.
End date for programme is December 2025.
NHS Dentistry:-
- Improve access to services with the aim to reduce
waiting times with a specific focus on emergency and
unscheduled care, improving access for people in our
most vulnerable groups through; 
- Support patients to manage their oral health for better
health outcomes;
- Implement priorities and objectives identified from the
programme of work to develop the vision and strategy for
dental services;
- Invest in the development of dental workforce to improve
retention and capacity; and
- Review of current care within practices with the aim to
provide a greater range of services within General Dental
Practices.
March 2026
Community Optometry:-
- Implementation of the Community Glaucoma Service
(CGS) within NHS Ayrshire and Arran; and 
- Roll out the Juvenile Idiopathic Arthritis (JIA) service to
community optometry. 
March 2026 
June 2025
Urgent Care Pathway for General Practice:- 
- Extend the urgent care General Practice model to cover
all GP Clusters across Ayrshire; and
- Extend to a model for pre-bookable appointments at an
AUCS primary care treatment centre following a referral
from General Practice. 
September 2025 
December 2025 
10. Mental Health 
The Mental Health and Wellbeing Strategy MHWBS published in September 2023, sets out
a vision of a Scotland, free from stigma and inequality, where everyone fulfils their right to
achieve the best mental health and wellbeing possible.  Locally we will take a life-course
approach to understanding mental health and will endeavour to develop a programme of
work, with partners, over the coming year to identify and align actions in Ayrshire and Arran
to the national delivery plans.  Also published in September 2023, The Core Mental Health
Quality Standards (CMHQS), sets out the expectations for what services will provide and are
structured around the themes that emerged from engagement with people with lived

Page 35

experience of using mental health and psychological services and the workforce.  Along with
the Core Mental Health Quality Standards, 4 service specifications have been published in the
past 24 months and are being implemented across NHS Ayrshire and Arran: 
• National Specification for Psychological Therapies and Interventions;
• National Specification for Eating Disorder Care and treatment in Scotland;
• CAMHS Service Specification; and
• Children and Young People – National Neuro-developmental specification. 
Since the publication of the new strategy and delivery plan in 2023, Mental Health Services
have undertaken a mapping exercise of the existing local priorities and outcomes as set out
in the Ayrshire Mental Health Conversation against the Mental Health and Wellbeing
Strategy Delivery Plan.  We are assured that local priorities and outcomes in place and The
Ayrshire Mental Health Conversation: Priorities and Outcomes (2019 -2027) continue to be
reflective of the three areas of focus and 9 outcomes set out in the Mental Health and
Wellbeing Strategy. 
A Mental Health and Wellbeing Workforce Plan was published in November 2023 in
recognition that delivering on the Mental Health and Wellbeing Strategy can only be
achieved with the right workforce, supported to have the right skills, in the right place at the
right time. As in other service areas, there are significant workforce challenges facing Mental
Health services. The Community Mental Health Team (CMHT) have not seen the same
levels of investment as other Mental Health services in recent years. This has led to a
significant gap in service demand and capacity.  Recognising recruitment challenges for
qualified Mental Health workers (with many posts expected to take up to a year to fill), the
service will consider new advanced/enhanced roles and different ways of working.  In
CAMHS, recruitment challenges are particularly around Psychiatry, Nursing and
Psychology.  The service will continue to look at the skill mix required for the service, based
on these challenges, recruit more Allied Health Professionals (AHP’s) and look at innovative
ways to encourage Psychiatrists to work in Ayrshire. Psychological Services are also
experiencing challenges in recruiting to specific priority posts, including Child and Adult
Mental Health in the Community. Although training places are increasing year on year, there
is currently an insufficient specialist workforce to fill all vacant posts across Scotland so there
is currently a competitive workforce context. 
Within 2025-26 we continue work to ensure the mental health built estate enables the
delivery of high quality, person centred and safe care, with a focus on implementing the
national Mental Health Built Environment Quality and Safety toolkit.  In addition to work on
the building toolkit, we continue to utilise the Scottish Government infrastructure budget to
support digital pilots. The newly refurbished West Road CAMHS/CEDS unit will launch early
in 2025 following circa £600k investment and we plan to refurbish Kilne Walk in Irvine for
our Perinatal Mental Health service. Early stage improvement work is being assessed for
Ward 7a at Woodland View and the Mental Health Assessment Hub opened in 2024 all with
infrastructure investment.   
10.1 CAMHS

Page 36

Within Ayrshire and Arran, CAMHS services are provided by multi-disciplinary teams that
provide assessment and treatment/interventions in the context of emotional, developmental,
environmental and social factors for children and young people experiencing mental health
problems. This is provided through three distinct teams to ensure that children and young
people are on the correct pathway at a much earlier stage: Specialist Community CAMHS
(SCAMHS), CAMHS Urgent Assessment and Intensive Treatment (CUAIT) and
Neurodiverse CAMHS (N-CAMHS). 
Whilst transforming and developing our services we will continue to learn from children,
young people, families and Carers with ‘Lived Experience’ of the service and continue to
work to gain feedback through KIDSCREEN which is a health related quality of life
questionnaire for children, young people and their parents. 
Within 2025/26 CAMHS will continue to work towards the waiting time targets set out in the
CAMHS NHS Scotland National Service Specification. Already CAMHS has met the 4-week
first appointment response time in alignment with the national specification through a
redesign of the service and implementation of the three pathways and by fully implementing
the revised service access criteria of accepting only those referrals where there are
underlying mental health needs in alignment with the national specification. This has
enabled meaningful redirection of referrals to wider whole system supports and services to
more appropriately meet the needs of children and young people who do not have an
underlying mental health condition. Focus is now on providing interventions and treatments,
where required and agreed with children, young people and families/carers, as soon as
possible, and no later than 18 weeks from first referral, with the median experienced wait for
treatment being no longer than 12 weeks.   
Within 2024/25 NHS Ayrshire and Arran worked in partnership with North Ayrshire Council
to create a specialist centre for CAMHS, as well as the all-age Community Eating Disorder
Service (CEDS) in Ayrshire and Arran.  With building works completed in 2025, the centre
at West Road, Irvine will aim to change the way the residents of Ayrshire and Arran access
and receive mental health care.  It will also provide a base for outpatient services for the
CEDS and Neuro-CAMHS team.   
In addition, we will continue to work with our IT systems and through a programme of wider
transformation linked to the Mental Health Digital Transformation Board, will endeavour to
develop effective data collection systems that provide robust data and reports to inform
service improvement, redesign and monitoring of performance. This will also prepare the
service for reporting on delivery of the forthcoming Mental Health Standards.  
Aims/Objectives 2025-2026 (Year 1) KPI
Improve access to mental health service and build
capacity and sustainable delivery to maintain the CAMHS
18 week RTT and work towards the 4 week target within
National Specification.
18 week RTT and 4 week SG Target 
Improve service delivery and resilience with the
recruitment and retention to CAMHS workforce.
% staff retention in key disciplines 
Improving mental health environment and patient safety. Feedback from young people, parents/carers
through QR codes to Microsoft
questionnaires, Care Opinion and verbal
feedback through CAMHS Participation
Officer.

Page 37

CAMHS will continue to learn from children, young
people, families and Carers with ‘Lived Experience’ of the
service.
Feedback from young people, parents/carers
through QR codes to Microsoft
questionnaires, Care Opinion and verbal
feedback through CAMHS Participation
Officer.
N-CAMHS will continue to see young people who are
currently on the N-CAMHS waiting list. 
The N-CAMHS waiting list will be reduced and
young people will be seen more timeously. 
Actions
2025-2026 (Year 1)
By When
Using Trakcare and CAMHS Benson Wintere DCAQ
Model to identify ways to meet the additional contact at 4
weeks.
March 2026
Further develop and expand on the skill mix of the
workforce in particular encouraging Psychiatry and
Psychology posts to CAMHS.
March 2026
CAMHS business case will have been developed for
CAMHS Inpatient beds in Ayrshire on the Woodland View
Site.  Recent communications regarding capital spend
whilst remaining a key objective will result in a delay,
whilst potential funding streams are sourced.
Start discussions for Inpatient facility 2025/26
Access qualitative feedback through Kidscreen as well as
quantitative data.
Ongoing
Commission external providers to assess children and
young people.
March 2026 
10.2 Psychological Therapies 
The latest published data, November 2024, indicates that compliance for Psychological
Therapies (92.8%) remains higher than the Scotland average. Developments over the next
12 months will address the requirements and standards dictated by the Psychological
Therapies Service Specification with a specific program of work, linked to Scottish
Government timescales, for implementation. 
The Self-Assessment tool to consider compliance with the Psychological Therapies Service
Specification will be available from January 2025. Some parts of Psychological Services
have already started with mapping their service delivery against the service specification
and improvement work is underway. This work is led by the Senior Psychology Leadership
team and will involve cross discipline and specialty engagement to ensure adequate
outcomes. Dedicated clinical governance routes have now been established with the start
of the Psychological Therapies and Interventions Clinical Governance Group and the
Psychological Services Clinical Governance Group. Both groups are chaired by the Director
of Psychological services. 
Patient centred areas of focus will continue to address issues of longest waits, matched-
stepped care within services for children and young people, neurodevelopmental service
provision (both Children and Adults) and whole board alignment to the updated Matrix
Treatment Recommendation for Psychological Therapies (2023) and the implementation of
the National Specification for the delivery of Psychological Therapies and Interventions
(Scottish Government, September 2023). This will sit alongside continued work in ensuring
a Trauma informed approach is embedded within all directorates of the organisation.

Page 38

Working with partners in acute/ neurological services to increase workforce capacity of the
psychological therapy provision is a key objective. Specific gaps in Cancer Care and Stroke
need to be considered as a priority. 
Ayrshire and Arran has been successful in obtaining funding to be a pilot site for Early
Intervention in Psychosis. Recruitment is underway and establishment of Early Intervention
in Psychosis service is planned for Quarter 1 2025/26. 
Risks over the coming financial year are the reduction in Scottish Government funding
streams and savings targets. Reduction of these streams of funding risks a significant impact
on core mental health services. The lack of allocation to Primary Care funding also adversely
impacts on demands upon secondary care and our ability to meet waiting times targets. 
Implementation of the National Specifications relating to children and young people with
neurodevelopmental conditions, and the Community Wellbeing Framework for Children and
Young people, are considered important to specialist secondary mental health services
being able to meet waiting times targets. These specifications sit outside specialist mental
health, but any failure will directly affect the pressures upon our service. Recent work within
the areas of Child and Adult Neurodevelopmental Assessment has concluded that
development of sustainable assessment services will necessitate specific, additional funding
requests to meet the increasing demand for neurodevelopmental condition assessment and
treatment. 
Aims/Objectives 2025-2026 (Year 1) KPI
Improve overall 18 week RTT to consistently comply with
standard across all specialisms.
RTT 92% 
Implementation of Psychological Therapies and Interventions
(PT&I) Standards.
Psychological Therapies and Interventions
(PT&I) Standards implementation
Improve service delivery and resilience with the recruitment
and retention of Psychological workforce.
Improved service delivery and resilience 
Actions
2025-2026 (Year 1)
By When
RTT
- Detailed Trajectory work in different specialisms - DCAQ; 
- Further analysis and formulation of data to create better
understanding of reasons behind access in struggling
specialisms; and
- Redesign of service delivery model where needed.
March 2026
- Assessment Tool for PT Spec implementation will be
rolled out. 
- Assessment to commence for all Psychological Therapy
specialties/teams. 
- Engagement with wider services delivering
Psychological therapies needed.
September 2025 
- Through data and trajectory analysis gain more clarity on
workforce gaps and skill mix/safe staffing levels; and
- Develop workforce plan for overall service.
March 2026 
10.3 Community Mental Health Services

Page 39

Adult Community Mental Health Services are devolved in Ayrshire and Arran to their
respective Health and Social Care Partnerships (HSCP).  Although they might work and look
slightly different in each area, the fundamental service delivery is the same.  As such the
following aims/ objectives have been agreed collectively by all three HSCP’s.  
Aims/Objectives 2025-2026 (Year 1) KPI
To implement the Core Mental Health Standards into Adult
Community Mental Health services.
Implementation of the Core Mental Health
Standards
To ensure that individuals have access to mental health
services within primary care in order to ensure we are
supporting prevention and early intervention agenda.
Access to mental health services within
primary care.
Ensure service delivery aligns to and contributes towards
national strategies relating to mental health.
When needed, provide complex or specialist treatment
quickly, effectively and to the highest standard.  
Minimise average (median) wait for initial
assessment (Community Mental Health
Team). 
Maximise % of people subject to Mental
Health Act supported via care programme. 
Actions
2025-2026 (Year 1)
By When
Benchmark current service against Core Mental Health
Standards.  
Identify gaps in attainment, what controls and supports are
required to attain them.  
Seek appropriate help to attain controls and supports
required.  
Re-evaluate impact and efficiency of implementation.  
March 2026
Deliver the integration of the primary care mental health
workforce into wider primary care multi-disciplinary teams
and community and secondary care.
March 2026 
10.4 Unscheduled Care 
The Unscheduled Care Mental Health Service is delivered Pan Ayrshire, managed
operationally by the North Ayrshire HSCP.  The service has seen many developments and
opportunities for growth over the past number of years.  The main aim is to embed service
changes, and this year to ensure local delivery is in attainment or excel of national standards. 
Aims/Objectives 2025-2026 (Year 1) KPI
Reviewing local Psychiatric Emergency Plans to align them
to the national template.
Alignment of local Psychiatric Emergency
Plans to national template. 
Actions
2025-2026 (Year 1)
By When
Psychiatric Emergency Plans
- Identify national template;
- Benchmark local planning against national template;
- Identify gaps and adaptations required of local plan; and
- Update and ensure appropriate engagement with
stakeholders.
March 2026

Page 40

10.5 In Patient 
Within the Mental Health Inpatient Service key priorities for 2025/26 will be to improve patient
flow, reduce the average length of stay and number/duration of delayed discharges. 
To support these improvements and deliver a more coherent system of forensic mental health
services, we will work to: 
• Improve referral pathways and increase expectation of ‘pace’/throughput; 
• Implement more robust bed projection processes; 
• Continue to develop relationships with the West of Scotland Forensic Network, being part
of wider bed capacity solutions; 
• Continue to review impact of recently opened Unscheduled Care Assessment Hub and
opportunities for Adult Mental Health Admission wards;
• Review persons subject to unplanned (UNPACs) placement and repatriate locally as
clinically appropriate; 
• Seek support to develop a Data Dashboard to provide robust data on service performance
against key measures to inform service delivery and improvement; and 
• Utilise the new Band 4 Assistant Practitioners to enhance service delivery, reducing
supplementary staffing spend. 
Aims/Objectives 2025-2026 (Year 1) KPI
Improve patient flow by reducing ALOS from Q1
Baseline. 
By March 2026  
Average Length of Stay 
AMH Acute = tbc days
EMH Acute = tbc days
Improve patient flow by reducing duration of delayed
discharges from Q1 Baseline. 
By March 2026  
Delayed Discharges
AMH Days = 
EMH Acute days = 
Deliver a more effective system of Forensic Inpatient
Services. .
Referral Pathways agreed/implemented. 
Ongoing participation in West of Scotland
Forensic Network meetings. 
Increased scrutiny around UNPACs referrals
to exhaust all local solutions. 
Themed analysis of persons subject to
UNPACs to consider generation of local
options. 
Reduce supplementary staffing spend. Q3 – reduction of 5%
Q4 – further 5% reduction 
Actions
2025-2026 (Year 1)
By When
Reducing LOS March 2026

Page 41

Robust bed management processes including use of
traffic light system to monitor progress against PDD. 
Analyse impact on admission patterns of unscheduled
care assessment hub opening and activity for AMH Acute
beds. 
Reducing Duration of Delayed Discharges
Monitoring/escalation of delayed discharges via Discharge
Liaison Groups. 
Participate in HIS supported workstream to review
Delayed Discharges and identify improvement actions. 
Ongoing 
Initial engagement September 2024. Scoping
programme currently with expectation of
recommendations April 2026.
Forensic Inpatient Services
Generate and implement referral pathways to increase
‘pace’/throughput. 
More robust bed projection processes. 
Continue to develop relationships with WoS Forensic
Network, part of wider bed capacity solutions. 
Look to repatriate persons on UNPACs placement as soon
as possible.
March 2026
Reduction of use of supplementary registered staff from
Q3 2025/26 on Band 4 APs taking up post. 
March 2026 
10.6 Alcohol and Drug Service 
NHS Ayrshire and Arran work with partners to support the National Mission on Drugs to
reduce drug related deaths and improve lives.  Priority areas include the implementation of
Medication Assisted Treatment (MAT) Standards, delivery of the treatment target and
increasing access to residential rehabilitation. 
Services will prioritise the delivery of the MAT standards by implementing their local
improvement plans with the support of the national MAT support team (MIST).  Whilst
reviewing and improving MAT access through established community alcohol and drug
services, the additional focus over the next 3 years will be on implementing actions to
support MAT access through wider settings e.g. primary care, prison and police custody.  
A specific challenge in implementing and embedding MAT within primary care is the
absence of recurring funding.  Discussions continue with colleagues across primary care,
finance, the Health Board, Health and Social Care Partnerships (HSCP’s) and Alcohol and
Drug Partnerships (ADP’s) to highlight the funding challenges and explore ways to continue
to resource this work.
Services will continue to offer an ‘open’ referral process and be flexible in their approach to
meet the ongoing national ‘Access to treatment’ waiting time’s standards.  The promotion of
Alcohol Brief Interventions will continue across core and wider settings.  We will work with
our partners to implement additional measures to reduce both drug and alcohol related
deaths.  Increased support will be available to individuals following a Non-Fatal Overdose,
local ADP drug related death prevention strategies will be implemented, improved pathways

Page 42

of support will be available to better support individuals with co-occurring mental health and
drug and/or alcohol use (with updated guidance being available for staff) and Naloxone
related training and supply will be prioritised.
In March 2022, the Minister for Drug Policy set a new ‘substance use’ treatment target to
increase the numbers of individuals accessing treatment support by April 2024.  Pathways
and processes are in place to offer quick access to treatment including having an ‘open’
referral system and supporting more individuals into treatment via MAT interventions.  In
terms of a future target, post April 2024, services are awaiting new information whilst advice
has been sought from the Minister.
Individuals from across Ayrshire and Arran will continue to be supported, as required, to
access local hospital based detoxification and rehabilitation support via Ward 5, Irvine. 
Families will be prioritised for support via access to the national family support facility
(Harper House) based in North Ayrshire, who provide safe, structured support for the whole
family to address their problematic drug and/or alcohol use, improve their mental health and
quality of life.  Individuals will also be supported to access external residential rehabilitation,
however, due to current demand, the challenge will be securing sufficient funding from local
ADP’s and/or the Scottish Government.   
Aims/Objectives 2025-2026 (Year 1) KPI
Consistently deliver safe, accessible, high quality drug
treatment across Ayrshire and Arran.
Sustain delivery of MAT Standards
Meet national 'access to treatment' Waiting Times
Standards of 90% of individuals to commence treatment
within 3 weeks of referral and 100% within 6 weeks.
Treatment Waiting Times Standard
90% within 3 weeks
North Ayrshire – 90%
South Ayrshire – 90%
East Ayrshire – 90% 
100% within 6 weeks
North Ayrshire – 100%
South Ayrshire – 100%
East Ayrshire – 100%
Ensure naloxone remains a priority and is accessible for
those who most need it.
Minimum kits will be supplied by March
2026
North Ayrshire - 480 kits 
East Ayrshire - 330 kits
South Ayrshire - 350 kits 
Build upon the residential rehabilitation pathways for
individuals from pre rehabilitation, during and post
rehabilitation.
Review and improve on current Residential
Rehabilitation Pathway and Integrate use of
the Scotland Excel rehabilitation provider
framework into the pathway. 
Actions
2025-2026 (Year 1)
By When
North Ayrshire 
Benchmark current provision to support individuals
seeking help for stimulant and benzodiazepine use.
Work with partners to identify gaps and improvements,
implement agreed actions and evaluate.
March 2026
North Ayrshire  March 2026

Page 43

Implement local Naloxone action plan, offering Naloxone
training, raising awareness and promoting use of Naloxone.
Supply a minimum of 480 Naloxone kits (and emergency
life-saving intervention).
North Ayrshire
Continue to implement pathways of support into, during
and after residential rehabilitation through the co-
ordination and support of a Single Point of Contact
(SPoC) and Recovery Development Workers (RDW) -
peer workers.
March 2026
East Ayrshire 
An increase in ANP/ Clinical Nurse Specialist and
Specialist GP in our rural cluster areas to improve access
at a primary care level.
March 2026
East Ayrshire 
Via the Multi agency Residential Rehabilitation Working
Group, develop and implement the Residential
Rehabilitation pathway which is clear, consistent and easy
to navigate from pre rehabilitation to post rehabilitation
stage.
March 2026
East Ayrshire
Rapid Access to Drug and Alcohol Recovery Service will
work with HMP Kilmarnock Healthcare to implement a
process to enable individuals who are East Ayrshire
residents and are prescribed Opiate Replacement
Therapy to be provided with a "Safe Talk" via Near Me.
March 2026
East Ayrshire
Implement the use of Near Me technology for planned
liberations from HMP Kilmarnock for individuals who are
prescribed Opiate Replacement Therapy.
March 2026
East Ayrshire 
Deliver a Recovery Oriented System of Care for drugs and
alcohol via the Alcohol and Drugs Partnership Strategic
Plan.
March 2026 
South Ayrshire 
Test of change (TOC) in South Ayrshire to demonstrate
proof of concept for a model to deliver on MAT 7. 
TOC will be evaluated in 2026, for any further
developments or improvements. 
10.7 Learning Disabilities 
Learning Disability Services are delivered within each of the Health and Social Care
Partnerships, with North Ayrshire HSCP taking the lead in relation to some elements of
shared delivery, specifically the Assessment and Treatment facility delivered in Ward 7A
Woodland View.  The model of delivery within Ward 7A has already undergone review in
recent years, with the result that the number of beds available within the ward have been
scaled back in order to create a better care environment.  Despite these positive changes,
issues within the ward, compounded by the ongoing problem of delayed discharge linked to
limited availability of appropriate community supports, have created an urgent need to again
look closely at its model.  This is being done with a view to informing possible changes, and
the work is being led by North Ayrshire HSCP.  The need for this work is further highlighted
by the publication of reports by the Scottish Human Rights Commission (2025), and by the
Mental Welfare Commission (2025), regarding the situation regarding delayed discharges
across Scotland, and the lack of progress nationally in relation to meaningful delivery of
human rights informed in this regard.

Page 44

This national focus on hospital admissions is complemented by a national focus on more
preventative activity, ideally delivered within Primary Care, namely Annual Health Checks. 
Implementation of the Scottish Government’s new specification regarding Annual Health
Checks for people with learning disabilities has been progressing at pace within Ayrshire. 
This work has benefited to a large degree from the pre-existing work around the
establishment of GP Registers of people with learning disabilities, linked to a previous
Enhanced Service specification.  While a great amount of positive work has been
undertaken regarding delivery of the new Health Checks, there remains an awareness of
the need to learn from their delivery, and that of the Learning Disability Health Checks which
preceded them, with a view to informing future activity.  To a large degree, this reflects
findings of note identified in initial delivery of the new checks in North Ayrshire, including the
large number of individuals for whom the check identified no required actions (over those
already in place).   
In their ideal form, the Annual Health Checks represent an opportunity to support
mainstream and other services in meeting their obligations regarding the care and inclusion
of people with learning disabilities.  While much evidence already exists regarding the needs
of people with learning disabilities, and how services can best respond to these,
understanding this from a local context remains a necessary activity.  With this in mind, the
North Ayrshire Learning Disability Service has commenced a collaboration with the Local
Information Support Team from Public Health Scotland, with a view to understanding the
service use and health needs of the local known learning disability population; how this might
differ the general population; and what this suggests about relevant service responses. 
While this work has started with a focus on North Ayrshire, the hope is that LD Services in
East and South Ayrshire will also become involved.  
Aims/Objectives 2025-2026 (Year 1) KPI
Continue delivery of Annual Health Check under new
specification, and identification of learning and innovation
opportunities linked to this and pre-existing experience of
delivery of enhanced primary care services to people with
learning disabilities across Ayrshire.
Delivery of report on 2025-26 activity and
identification of development plans for
coming years.
Building on work to date, review provision of care and built
environment within Ward 7A, with a view to identifying
necessary development work for enhanced or alternative
provision.
Deliver relevant change in model of inpatient
delivery. 
Further develop collaboration with Public Health Scotland
(Local Information Support Team) as part of a broader
programme of learning and co-design within the service,
with a view to annual delivery of reporting.
Annual delivery of reporting. 
Actions
2025-2026 (Year 1)
By When
Develop an overarching understanding of activity and
associated outcomes linked to delivery of the new Health
Checks in each Ayrshire authority.
April 2026
Benchmark against provision elsewhere in Scotland;
review admissions to date and associated learning e.g.
around admission avoidance; explore workforce
requirements, informed by recruitment to date and use of
Bank Staff; review delayed discharges to date and
implications.
July 2025

Page 45

Continue to link regularly with PHS colleagues and ensure
appropriate use of learning data, as well as ensuring that
the LIST team stay informed about and involved in the
ongoing learning and improvement work.
Ongoing 
11. Healthcare in Custody 
In 2023 the Scottish Government established a Short Life Strategic Leadership group to
drive meaningful improvement to prison health care. This identified three priority areas with
one of these being to develop a Target Operating Model (TOM) for healthcare service
delivery. The National Prison Care Network has been asked to lead on the development of
a TOM. The aim of this work is to provide a framework for nationally consistent model for
healthcare delivery in prisons alongside tangible change ideas to deliver this. A TOM has
been developed with 9 domains identified. Baseline information has been recorded with a
plan for 6 monthly updates of progress made that is shared in a data dashboard. Areas of
work have been identified with the HMP Kilmarnock healthcare leading on national work in
relation to the prison admissions process.
Drug misuse treatment and reducing drugs deaths continue to be a priority for service
improvement. Nationally the MIST team are co-ordinating work on the delivery of MAT
standards in custodial settings with a prison toolkit being finalised. Reporting on progress of
MAT standards in custodial settings will commence in 2025.
Improvement work for prison healthcare is in the context of some particular service
pressures following HMP Kilmarnock moving from SERCO the private provider to the
Scottish Prison Service in March 2024. Principally these are in relation to an 18% increase
in the prison population and changes to the prison regime which have an impact on clinical
service delivery.
Aims/Objectives 2025-2026 (Year 1) KPI
Further progress implementation of Medication Assisted
Treatment (MAT) standards working with the national MIST
(MAT implementation Support Team) to embed practice
improvement in prison setting and develop improvement
areas in Police Custody.
Implementation of Medication Assisted
Treatment (MAT) standards in Prison and
Police Custody.
Progress service improvement in priority areas identified by
the Target Operating Model under the oversight of the
National Prison Care Network (NPrCN). Particular focus on
prison admission process where development is being led by
HMP Kilmarnock healthcare.
Implementation of service improvement in
priority areas identified by the Target
Operating Model. 
Actions
2025-2026 (Year 1)
By When
MAT Implementation
• Benchmark HMP Kilmarnock practice against Prison
Toolkit which is anticipated to be finalised in March 2025;
• Develop recommendations from review of staff training
and support needs in relation to MAT 6 & 10; 
• Recruitment of Psychology post;
March 2026

Page 46

• Complete framework for range of evidenced interventions
to be delivered by mental health MDT and addiction
team; and
• Explore improvement areas that be delivered by existing
on-call FME healthcare model. 
Target Operating Model 
• Six monthly (April / October) reporting into National
Prison Care Network (NPrCN) on progress of
improvement areas;
• Agree revised model focussing on immediate risk and
need on day of admission and follow up appointments for
holistic assessment of healthcare need;
• Build new admission process on Vision; 
• Test revised model; and
• Undertake evaluation of revised model with focus on
evidence of improved outcomes and areas of model that
may require adaptation. 
March 2026 
12. Pharmacy 
The priorities for the pharmacy directorate in 2025/26 are to support our key areas of risk,
cancer services including aseptic dispensing; to deliver the objectives of the Primary Care
Phased Investment Programme (PCPIP); to support acute services to optimise patient flow
and minimise delays to discharge; and to work collaboratively with regional colleagues on
developing and implementing a Regional Medicines Formulary and joint priorities to support
clinical pharmacy services using Hospital Electronic Prescribing and Medicines
Administration system (HEPMA).  Focussing on digital solutions to support clinical pharmacy
service delivery will lead to movement of the workforce away from tasks that can be
automated to more complex roles such as polypharmacy reviews and long term condition
management.
Where additional workforce is required this is dependent on available funding and available
workforce. Limited pipeline of pharmacists via the Foundation Training Year Trainee
Pharmacist programme and lack of pipeline of Pre-registration Pharmacy Technician
Trainees are key risks to recruitment to support the additional workforce required to deliver
safe care to patients in high care areas, cancer services and to deliver pharmacy services
across 7 days.  Uncertainty regarding ongoing funding of workforce recruited to the PCPIP
is also a risk to delivery of the programme and, subsequently, fuller implementation of
pharmacotherapy. 
Aims/Objectives 2025-2026 (Year 1) KPI
Work with colleagues in the West of Scotland to develop a
Regional Formulary process and implement a Regional
Formulary.
The development of a Regional Formulary
process and implementation of a Regional
Formulary.
Deliver the pharmacotherapy elements of the PCPIP
demonstrator site programme.
PCPIP demonstrator site programme
pharmacotherapy elements delivered.
Scope the redesign and delivery of 7 day clinical pharmacy
services to critical & high care areas to improve compliance
with national standards for clinical pharmacy services and
contribute to reducing length of stay. 
Deliver a 7 day clinical pharmacy services
to critical & high care areas.

Page 47

Scope the expansion and delivery of the current 7 day
operational pharmacy service to provide an equitable service
across the full week.
Equitable pharmacy service across the full
week.
Work with colleagues across NHS Scotland THBs to
implement, maintain and develop the Pharmacy Early
Warning (PhEW) score to ensure patients are prioritised
appropriately for clinical pharmacy review.
Implement, maintain and develop the
Pharmacy Early Warning (PhEW) score.
In line with Scottish Cancer Action Plan 2023-26, ensure
available pharmacy infrastructure, capacity and workforce to
ensure that SACT medicines are available to people with
cancer.
SACT medicines are available to people
with cancer. 
Actions
2025-2026 (Year 1)
By When
Regional Formulary process
- Project working group to be convened; 
- Key project personnel to be recruited;
- Governance processes to be developed, agreed by
ADTCs and implemented;             
- Board Formulary processes to be stood down; and
- Regional Formulary Governance structure to be
implemented following approval by Board ADTCs.
March 2026
PCPIP demonstrator site programme
- Expand pharmacy support worker role in delivery of
service;
- Clearly define roles of each member of the team- right
person, right task;
- Expand pharmacy hubs - skill mix and resilience;           
- Develop a supervision/ preceptorship programme to
improve pharmacists confidence in clinical decision
making and risk management; and  
- Test and evaluate Advanced Pharmacist Practitioner role.
March 2026
7 day clinical pharmacy services critical and high care
areas
- Identify clinical areas where 7 day clinical pharmacy
service is required; 
- Design service specification, define roles and scope
workforce required to deliver ensuring right person right
task;
- Secure funding to recruit workforce; 
- Address any contractual changes required; and
- Implement training programme to ensure appropriate
skillmix and resilience for service delivery over 7 days.
March 2026
7 day operational pharmacy service
- Agree the operational areas that require to be covered at
weekends; 
- Scope the workforce required to deliver the service
robustly; and
- Ensure appropriate skills mix and secure funding to recruit
additional workforce to deliver this service.
March 2026
Pharmacy Early Warning (PhEW) score
- Implement PhEW tool to all WoS boards; 
- Identify boards out with WoS wishing to adopt PhEW;
- Provide clinical and digital pharmacy support to adopting
boards to ensure successful implementation;  
- Establish SLA with participating boards; 
- Embed governance process for maintenance and
validation of PhEW score; and 
March 2026

Page 48

- Scope clinical specialties that would benefit from bespoke
PhEW score, develop modified PhEW score for identified
clinical specialties.
Scottish Cancer Action Plan 2023-26
- Review Cancer Forward-Look reports to anticipate growth
in SACT provision;
- Complete capacity planning exercises for aseptic and
dispensary areas to ensure appropriate capacity for
growth;
- Implement SACT Dispensing Hub to ensure capacity,
dedicated workforce and appropriate procedures for safe
dispensing of SACT;
- Complete workforce review to inform recruitment, training
and allocation;
- Regularly evaluate provision of SACT services, workforce
and capacity; and
- Implement training programme to ensure appropriate skill
mix and resilience for service delivery.
March 2026 
13. Infrastructure 
Scottish Government issued a Director’s Letter (DL) to all NHS Boards outlining the
requirements for all NHS Boards to prepare a whole-system infrastructure plan.  Since
receiving this, efforts were renewed on the whole-system Programme Initial Agreement
(PIA) document. 
Work was restarted and has been repositioned to reflect the impact of the pandemic and the
reform narrative will form the whole-system PIA, our plan is to become operationally and
financially sustainable through significant reform. This version builds upon the original PIA
while incorporating the specific details requested in the DL letter.
Scottish Government indicated in the DL that the PIA should be submitted by NHS Boards
in January 2026 however, given the substantial progress made, NHS Ayrshire and Arran
intends to submit this PIA document in draft in January 2025, aligning with the submission
of the Business Continuity Plan. At this stage, we do not anticipate formal feedback on the
PIA but rather seek a discussion with Scottish Government on its content and the proposed
direction of travel.
The whole-system PIA narrative will empower us to focus on engaging our stakeholders,
communities, staff and services in the essential work now needed to take service reform
and redesign to the next level.  To deliver on our Caring for Ayrshire ambition, it is crucial
that we elevate our engagement with stakeholders, to actively listen and learn from their
experiences and perspectives. Our commitment to effectively engage with citizens,
communities, and staff is paramount. We therefore propose a comprehensive approach,
involving widespread stakeholder engagement using co-production methodologies to
redesign care models with a ‘whole system’ perspective.  We will maintain open and
transparent communication and engagement with both internal and external stakeholders,
as well as our citizens, to inform and shape the programme.
A dedicated engagement and communications group will provide advice, support and
guidance on all associated stakeholder engagement activity aligned to the Caring for
Ayrshire ambition. Engagement and communication will be embedded throughout work

Page 49

streams and plans, to provide clarity, guidance and consistency for those leading on the
high impact changes.
The Board’s Business Continuity Plan (BCP) was submitted to Scottish Government in
January 2025 and confirmation of what funding will be provided is expected by end of March
2025. The Board’s submission plans for an additional £12.2m of funding for FY25-26 with
main areas of expenditure targeting:
• Improved accommodation for Critical Care and Oncology at UHC;
• Purchase of and improvement works to several GP Premises;
• Backlog Maintenance Work; and
• Investment in digital and medical equipment.
What will be able to be delivered will be dependent upon the final funding allocation provided
by Scottish Government.
Sustainability and Net Zero investment will be reflected through investment in building
infrastructure.
Aims/Objectives 2025-2026 (Year 1) KPI
Ensure that sustainability and net zero aspirations are
embedded within brief requirements for major
developments and comprehensive refurbishments.
March 2026
Improve utilisation of accommodation to support the
reduction in energy use.
March 2026 
Actions
2025-2026 (Year 1)
By When
Distributed Working and Estates Rationalisation.  TBC
Completion of Lister Street Distributed working Hub.  31 March 2025
Consolidate non clinical offices within Ailsa Main Building
facilitating exit from Eglinton, Greenan and Stair Buildings. 
TBC (Except Eglinton Meeting Room 1)
TBC (Including Eglinton Meeting Room 1)
Exit from Afton House.  
Demolition of Arrol Park Houses 4 to 9. 30 April 2025
Demolition of Lochranza ward, Ailsa. TBC
Demolition of Eglinton Greenan and Stair Building. TBC
Demolition of Afton House, Ailsa. TBC
Commence design and procurement work for wind turbine
UHA.
30 April 2025 (Subject to BCP funding) 
14. Community Wealth Building / Anchor 
NHS Ayrshire and Arran has developed an Anchor/Community Wealth Building (CWB)
Strategy to harness our power as an anchor institution and to positively impact health, social,
economic and environmental outcomes in Ayrshire and Arran. NHS Ayrshire and Arran’s
Anchor / Community Wealth Building (CWB) Strategy 2023-26 sets out the Board’s plans to
deliver on the anchor organisation ambitions alongside our anchor partners in the Ayrshire

Page 50

Community Wealth Building Commission and in support of the Ayrshire Regional Economic
Strategy and the Ayrshire Growth Deal. 
The strategy sets out the Board’s ambition to support creation of a fair local wellbeing
economy which enhances local wealth, reduces poverty and inequality through investing
and spending locally, creating fair and meaningful employment, designing and managing
our buildings, land and assets to maximise local and community benefits and reduce our
environmental impact. 
Tackling Ayrshire’s social and economic inequalities will not be easy. Poverty rates in
Ayrshire and Arran are higher than the Scottish average, Ayrshire’s workforce has fewer
qualifications, and it is forecast to experience less economic growth and greater reductions
in workforce in the short and medium-term. Given these stark economic inequalities, if
Ayrshire’s health inequalities are to be reduced, strategies must tackle the ‘fundamental
causes’ driving inequality. This requires a joined-up approach, bringing together local
partners to tackle inequality and to maintain a long-term vision of developing a local Ayrshire
wellbeing economy.  
Our Anchor/CWB programme is governed by the Community Wealth Building Programme
Board which meets quarterly. Our Anchor/CWB Programme focuses on the six pillars of
Community Wealth Building (Fair Work/ Workforce; Procurement; Land and Assets;
Financial Powers; Service/ Plural Diverse Ownership and Climate Change) with leads
appointed for each pillar.
The Anchor/CWB Year 2 Annual Report was presented to the NHS Board in October 2024.
The report provided assurance that progress has been made to deliver on NHS Ayrshire
and Arran Anchor/Community Wealth Building (CWB) Strategy in line with requirements of
the NHSScotland Annual Delivery Plan 2024. The report shared progress to-date on building
our Anchor/CWB programme demonstrating some of the work carried out during year 2 of
the programme. A Year 3 plan has been drafted and will be presented through governance
in Quarter 4 2024/25 for approval. 
The Community Wealth Building Programme Board will continue to progress workstreams
set out in our Anchor/CWB Strategy 2023-2026 and to deliver the actions set out in the
accompanying Year 3 plans. 
Aims/Objectives 2025-2026 (Year 1) KPI
Continue to lead on capacity building, building the
evidence base, supporting ongoing improvement, and
awareness raising of Anchors workstream and align work
with wider Community Wealth Building agenda, and as a
Board, support the redirection of wealth back into local
communities to help address the wider determinants of
health inequalities, by progressing specific, measurable
objectives that align with their Anchor Strategic Plan.
Delivery of the Anchor Strategic Plan 2023-
26 
Actions
2025-2026 (Year 1)
By When
Complete refresh of Community Wealth Building Strategy. June 2025

Page 51

Meet with pillar leads to develop in year actions (2025-
2026).
June 2025 
Agree sign off at CWB Programme Board of in year
actions.
June 2025 
Complete SG Anchor Metrics Return for FY 23/24. June 2025 
Pillar leads to progress in year actions and report
implementation to CWB Programme Board.
September 2025
Pillar leads to continue to implement in year actions and
report progress to CWB Programme Board.
September 2025
Prepare yearly report to reflect progress on in year
actions.
March 2026 
15. Workforce 
Further detail on our workforce positon will be submitted in accordance with the
requirements of Directors Letter on workforce planning and in addition, some detail is and
will continue to be provided via the NHS Scotland Financial Delivery Unit 15 box grid
quarterly self-assessment returns.
Strategically the Board continues to have strategic workforce risks in relation to clinical
registrant supply and capacity, with a distinct medical staffing supply and capacity risk being
established this year, both being very high risk and ongoing work to treat.  These risks
materially require national intervention as they are not unique to our Board and supply
chains for controlled staff groups are determined by government and as such constrains our
ability to make significant traction on some of the prescribed planning priorities for the
Delivery Plan.   
We anticipate that a consequence of the Agenda for Change Pay reform reduced working
week, and to a lesser extent protected learning time, will materially impact on our clinical
registrant risk stimulating further challenges in relation to supply and capacity which again
will not be unique to our Board.  NHS Ayrshire and Arran is proactively taking steps to assess
the risk and potential staffing resource required as mitigation in implementing the residual
hour that remains of the reduced working week which will have a material impact across all
organisational activity both clinical and non-clinical. 
An implementation plan for eRostering was in place during 2024/25 with the early adopter
areas being Nursing, Midwifery and Allied Health Professions by November 2026, with a full
rollout to the organisation by approximately November 2027.  Following a review, the rollout
was paused in October 2024, due to a number of issues and challenges that had been
identified during the first phase of the roll out.  A recovery plan is being drafted detailing the
challenges and barriers identified and recommendations to progress with implementation. 
The University of the West of Scotland (UWS) work in partnership with NHS Ayrshire and
Arran Nursing and Midwifery Teams to provide Practice Learning Experience for their
students. The overall aim of the UWS pre-registration programmes are to prepare students
for the academic awards and eligibility to apply for Professional Registration with the NMC.
The Executive Nurse Director along with Chief Nurse for Professional Development meet
with Strategic UWS Partners to ensure robust planning is in place.

Page 52

Post registration education is supported through an education fund (previously known as
SLA). This supports Nursing, Midwifery and Allied Health Professionals (NMAHP)
Registrants with continual professional development.
NMAHP clinical teams from NHS Ayrshire and Arran, led by the Chief Nurse for Professional
Development, work with UWS lecturers to ensure appropriate transition from 3rd year
undergraduate student to Newly Graduated Practitioners. This ensures clear
communications on recruitment processes, support in terms of the National Flying Start
Programme.
The Practice education facilitators (PEFs) team support clear collaborative between service
and Higher Education Institutions (HEIs). PEFs are a national network of nursing and
midwifery registrants that support learning in practice by working with staff within the practice
learning environments. They work alongside other partners in practice education such as
Care Home Education Facilitators (CHEFS) and Practice Education Leads. Practice
education involves teaching and learning that happens in practice or work based settings.
PEF’s work in partnership involving NHS Education Scotland (NES), National Health Service
Boards (NHS) and HEIs.
Close partnership working with Ayrshire College and NMAHP Professional Development
Teams, has led to the development and graduation of 19 band 4 Assistant Practitioners
within Acute Services with a further Mental Health Cohort of 11 trainees this academic year.  
A Practice Development Unit has been opened over the last 12 months by the Lead for
Practice Development. This allows an education space that can be utilised for education of
both registrants and Healthcare Support Workers.   This unit supported the education of 30
Internationally Educated nurses to achieve NMC registration. 
AHP Workforce transformation has continued through four distinct work streams:
• Digital and business support;
• AHP Healthcare support workers;
• Recruitment and retention; and
• Advancing practice.
A block recruitment approach for newly qualified AHPs was tested in 2024/25 with
successful outcome in terms of appointment to Band 5 posts across professions. 
International recruitment has also been utilised with success, in particular in filling previously
hard to fill posts in radiography. 
The AHP Leadership team continue to work in partnership with Ayrshire College in delivering
the ‘Access to AHP’ programme and are building strategic links with the Scottish HEIs who
deliver pre-registration AHP programmes.   
Aims/Objectives 2025-2026 (Year 1) KPI
Achieve further reductions in nursing agency staffing use
and continue to optimise bank arrangements. 
• Zero off framework usage
• HCA usage via bank only
• £1.2 m reduction in nurse agency
expenditure related to reduced agency
rate cards

Page 53

• £2.1 m reduction in nurse agency
2025/2026
Achieve reductions in medical locum spend. Lower level of agency spend via substantive
appointments to vacant medical posts
(reduction in consultant vacancies) and where
locum spend is necessary appointment as
NHS locum or adherence of Direct
Engagement compliance.
Encourage attendance - continued focus on our sickness
absence position with aspiration to narrow the gap between
current versus 2019/20 performance.
Cumulatively will contribute to our overall
ambition of a **% reduction for FY 2025/26 i.e. a
rate of **%.   
Please note this trajectory will be set once we
have the final outturn for FY 2024/25, which
has been an atypical performance year with
significantly elevated levels of absence, and
can assess the position and determine a
realistic trajectory of improvement for 2025/26 
Actions
2025-2026 (Year 1)
By When
Within our Acute Services sector work is ongoing in
collaboration with external contractors to review
establishment by all ward areas so as there is clarity as to
vacancy pressures and spend is more appropriately
directed towards substantive staffing solutions.  
Work is underway in tandem regarding rostering practice
to ensure that headroom / unavailability criteria and
parameters are robustly followed and we have ongoing
open adverts for staff joining our bank.
March 2026 
Continue to engage locums directly with the Board
Medical supplemental staffing group in place and grip and
control measures have been introduced. 
Work remains ongoing in looking at workforce planning
across our medical specialties, and implementing our
vision of Best Medical Workforce Strategy 
March 2026 
Make best use of our technology to increase efficiencies
in administrative and support services.
March 2026 
Undertake deep dive to look at how we may better
address the largest reason for absence (approximately
30% of all sickness absence relates to anxiety, stress,
depression and other mental illness).
March 2026 
Consistent and ongoing organisational messaging to
employees advising of support and wellbeing as well as
encouraging all staff to use their annual leave entitlements
fully, and throughout the year, to ensure they have rest
and recuperation.
March 2026 
Develop and launch a programme for undergraduate
nursing students to increase their knowledge of NHS
Ayrshire and Arran to further support their transition into a
Newly Graduated Nurses.
April 2025
Introduce a leadership programme for Band 6 and 7 within
NMAHP in line with the NMAHP Strategy to ensure a
prepared workforce.  
May 2025
To educate the current Practice Assessors and
Supervisors on the new C25 programmes for
undergraduate BSc Adult and Mental Health
Programmes. 
August 2025

Page 54

Increased communication and processes of the 2025
yearly recruitment for Newly Graduated Nurses and
Midwives to both students, HEIs and clinical teams.  
September 2025 
16. Digital 
The NHS Ayrshire and Arran Digital and Data Strategy 2023–2026, titled "Digital Excellence
in Healthcare: A Platform for Change," outlines our vision for creating a unified digital
infrastructure. This will ensure our organisation is equipped to seamlessly connect with
health and social care partners and national networks. The strategy establishes a technical
foundation for integration, enabling the delivery of efficient, patient-centred care when and
where it is needed.
Our digital strategy takes a system-wide approach and embodies a commitment across
Ayrshire and Arran to deliver an integrated care record. Capital investment has been
prioritised to advance this strategy, as it is seen as a cornerstone of reforming how the
Health Board delivers care closer to the patient. By embracing digital transformation, we aim
to introduce new ways of working across clinical and non-clinical settings, reducing
duplication, mitigating clinical risks, and supporting our workforce to deliver health and care
services effectively.
The optimisation of digital and data technologies is central to improving health and care
services. Enhanced patient access, improved safety, and continuity of care are achieved
through integrated single patient records that track the patient journey. This transformation
enables real-time care delivery supported by accurate and insightful data, live bed
management tools, and improved collaboration across the health system. These initiatives
prepare the Board for the future demands of the National Care Service and support reform
programmes, such as the integrated care record and distributed working.
Ongoing investment in TrakCare, our Patient Management System, is pivotal to developing
a fully integrated care record. The first milestone in this journey was migrating to a Software
as a Service (SaaS) solution, which ensures system stability and availability while reducing
hardware costs and aligning with national cloud-first objectives. TrakCare as a Service
supports innovation by enhancing clinical decision-making through real-time data
integration. The system’s scalability accommodates growth without significant investment in
physical infrastructure, underscoring its long-term value.
Maximising M365 capabilities remains a priority. Ayrshire and Arran participate in the
federation project, enabling seamless collaboration with two local authorities via Teams.
Work is underway to bring the third local authority onto the M365 platform. Developers are
also exploring the Power Platform to reduce reliance on third-party digital solutions. One
early success is the creation of a Desk Booking app to support the Distributed Working
Programme. Applications nearing the end of their lifecycle are being evaluated for
replacement with M365-based solutions to ensure cost-effectiveness and return on
investment. Additionally, dedicated resources are developing multidisciplinary teams
(MDTs) within the Teams environment for cancer care, fostering efficiency and cross-
specialty collaboration.

Page 55

Cyber resilience is an ongoing focus. Over the past 12 months, compliance with the
Refreshed Public Sector Cyber Resilience Framework (NIS audited areas) has increased
by 19%, compared to a 2% rise the previous year. Improvements in supplier and risk
management, alongside initiatives such as the Digital Champions Network and digital
training for non-executive directors, have been highlighted as examples of good practice.
Continued engagement with the Cyber Centre of Excellence ensures proactive monitoring,
reporting, and incident response.
Developing digital skills is integral to our strategy.  A Digital Skills Champion role has been
established to lead this work, complemented by a growing Digital Champions Network. A
recent digital skills survey is informing resource planning to ensure staff are equipped to
navigate the digital world as both employees and citizens.
A governance framework for Accelerated National Innovation Adoption (ANIA) projects is in
place to ensure alignment with local and national priorities. This process includes pre-
scoping checklists, business case development, and approval workflows to coordinate
resources, avoid duplication, and support evidence-based decision-making. A Strategic
Digital Delivery Group (SDDG), chaired by the Chief Executive, oversees the
implementation of the digital strategy. This group ensures strategic alignment across NHS
Ayrshire and Arran, including close collaboration with the three Health and Social Care
Partnerships. By adhering to this structured approach, the following benefits are realised:
• Efficient resource utilisation to deliver best value;
• Improved coordination to identify synergies and minimise overlap;
• Informed, strategic decision-making; and
• Elimination of siloed working practices.
The SDDG ensures that NHS Ayrshire and Arran remain at the forefront of digital
transformation, driving innovation and delivering sustainable improvements in healthcare
delivery.
Aims/Objectives 2025-2026 (Year 1) KPI
Adoption and implementation of the national digital
programmes.
- Open Eyes Optometry project initial
implementation complete in first services.
- National Child Health system to go live
within Ayrshire and Arran.
- M365 launch of One Drive and Sharepoint
pilot to expand to other areas following
completion of work in Digital Services.
- eRostering - completion of Nursing
Directorate rotas.
Improving cyber resilience and compliance. Cyber resilience and compliance
Provide Executive support and commitment to optimising
use of digital and data technologies.
Optimisation of use of digital and data
technologies.
Work collaboratively with other organisations to scale and
adopt innovation.
- Options appraisal for Digital Dermatology
project approved
- Scan for Safety project implemented within
Ayrshire and Arran
Set priorities and report progress in line with Board's Digital
Strategy.
New Digital Strategy for the Board.

Page 56

Actions
2025-2026 (Year 1)
By When
Continue to work with Digital Health and Care and NSS
on a number of national projects.
March 2026
Improve on the overall compliance score for NHS Ayrshire
and Arran in the 2024/25 Network and Information
Systems (NIS) Audit.
February 2026
Continue with quarterly meetings of the Strategic Digital
Delivery Group chaired by the Chief Executive.
June 2026
Continue working with regional and national groups
including the Accelerated National Innovation Adoption
group.
March 2026
Align with the national cloud first strategies to provide
resilient access to systems, flexible approaches to our
data and storage requirements and increased security of
systems.
March 2026
Review and update the Board's Digital Strategy during
2025/26.
December 2025 
17. Climate 
To establish a greener, board-wide estate, continuous engagement with stakeholders,
including building occupiers, is essential. These teams play a crucial role in promoting
efficient energy use. Despite the current system pressures, sustainability must remain a
priority alongside patient care. Emphasising the benefits and importance of sustainability is
critical, as it contributes to creating a safe, energy-efficient, and environmentally friendly
estate, which ultimately enhances patient care.
Energy consumption is a key factor in decarbonising the NHS Ayrshire and Arran estate and
requires a flexible approach to reduction.  A significant challenge lies in transitioning the
retained estate’s heat sources to low-carbon alternatives. Implementing innovative
technologies such as solar power and heat pumps is particularly challenging in ageing
buildings, where structural limitations can restrict feasibility.  Additionally, hospitals operating
around the clock require a dependable, uninterrupted energy supply.
There is strong interest in exploring new renewable and green energy sources. The Board
will collaborate with NHSScotland colleagues, other health boards, and external partners to
better understand the processes required to procure such energy solutions.  It is recognised
that achieving this will require robust infrastructure planning, sufficient time, and
coordination, particularly for transitioning high-emission sites within the ageing estate.
The transport fleet transition to fully electric vehicles is progressing, with the pool car fleet
procurement complete and efforts underway to convert the commercial fleet. Over the next
12 months, charging infrastructure will be expanded to ensure all EV pool and commercial
users can charge their vehicles at work.  Additionally, the NHS Ayrshire and Arran
Sustainable Travel Action Plan (2024–2027) will be implemented through the Active Travel
and Transport subgroup of the Climate Emergency and Sustainability Officers Group
(CESOG).

Page 57

We will continue to optimise greenspace to enhance biodiversity for the benefit of patients,
visitors, and staff. This includes advancing the Kyle Chemotherapy Garden project in
2025/26 and exploring creative uses of greenspace for therapeutic purposes, such as green
gyms, mindfulness activities, walking groups, and other outdoor initiatives known to support
physical and mental health. Active travel to our sites will also be encouraged, and we will
collaborate with local authority partners to develop active travel routes.
Our pharmacy sustainability program will continue efforts to reduce the use of harmful
substances and adopt more sustainable delivery methods, including reducing the
prescription of antimicrobials.
Progress on these initiatives will be monitored and reviewed by our Climate Emergency
Sustainability Operational Group (CESOG).
Aims/Objectives 2025-2026 (Year 1) KPI
Greenhouse Gas Emission reduction (Energy) Improve
the overall Building Energy Emissions in line with national
targets and from the previous year generated from the
Boards estate assets.
Complete the delivery of agreed list of in year
energy efficient projects and agreed
programme of works for the next 12 months. 
Report on savings to be achieved based upon
actual datasets.
Sustainable Travel - Improve the overall Transport
Emissions in line with national targets and from the
previous year generated from the Boards estate owned
transport and infrastructure.
Completion of the fleet hand over to the
various services across the organisation. 
Report on progress.
National Waste Targets - Reduce domestic waste by a
minimum of 15%, and greater where possible, compared to
2012/13.
Reduce domestic waste by a minimum of 15%,
and greater where possible, compared to
2012/13.
National Waste Targets - Reduce food waste by 33%
against 2015-16 baseline.
Reduce food waste by 33% against 2015-16
baseline.
National Waste Targets - Ensure 70% of domestic waste
is recycled or composted.
Ensure 70% of domestic waste is recycled or
composted.
National Green Theatre Actions - Improve on the
reduction in medical gas related emissions across the
board wide estate.
Implementation of changes to current
processes and procedures.
Greenspace and Biodiversity Kyle Chemotherapy Garden will be producing
year 1 spring bulbs and patients, visitors and
staff making use of the area.
Green gym and walking programmes fully
embedded at UHA/ Ailsa and woodland view
and walking programme in place for UHC
and other sites 
Actions
2025-2026 (Year 1)
By When
Reduction of Boards carbon and greenhouse gasses
through estates rationalisation and demolition programme
– risk that distributed working is resisted and unable to
vacate buildings earmarked for demolition.
March 2026
Continue to reduce emissions from travel and transport
activities through:
- Electrifying fleet – risk that suitable commercial vehicles
are not available at this time to replace current fleet
vehicles; and 
- Continue to work with public health on the development
and delivery of the sustainable travel Action plan-24-27 
Ongoing until 2035 
Ongoing until 2027

Page 58

and installing infrastructure with funding available in
25/26.
Waste 
- Reducing domestic waste by 15% compared to
2012/13;
- Reduce food waste by 33% against 2015-16 baseline;
and 
- Ensure 70% of domestic waste is recycled or
composted.  
All ongoing throughout year and will all be
tied into the new waste contract commencing
1/4/25 
Work in conjunction with Local Authorities and other
partner organisation to adopt more environmentally
friendly processes for grassland management on
grassland management.
All Ongoing throughout year, with different
phases being implemented in different
seasons. 
Continue to progress the development of Kyle
chemotherapy garden and green gym initiatives with
partner organisations and community wealth building
initiatives.  Opportunity to support community justice teams
in the Kyle garden project.
All Ongoing throughout year, with different
phases being implemented in different
seasons. 
18. Finance 
Situation
The health board set a deficit budget of £56.4 million for 2023/2024 financial year and £53.5
million for 2024/2025.  For 2025/26, the scale of cost pressures requires the Board to
achieve 3% CRES to stand still. 
The funding for New Medicines is less than the cost pressure.  In 2024/25 the NHS Ayrshire
and Arran deficit is about £8.8 million expected gap between funding (£16.7 million) and
expected spend (£25.5 million).  A 10% increase in 25/26 would increase cost to £28 million.
The Board is striving to achieve 3% (£30 million) cash releasing efficiency savings in
2025/2026, however currently not all of these have firm plans.  We expect CRES to rise to
£30 million recurring savings in the next plan due in mid-March 2025.
A significant risk for 2025/2026 will be the pay settlement which is not within the Board’s
control.
Background
Throughout 2022/2023 our acute hospitals had 180 unfunded beds open at a cost of £12.5
million.  Many of these were occupied by Delayed Transfer of Care (DToC) patients.  Our
objective in 2023/2024 was to close all of these unfunded beds and achieve cost avoidance. 
We only partially achieved this in 2023/2024 and still had 150 unfunded beds open with a
cost of around £12.5 million.  During 2024/2025 further progress has been made, however
we still have 90 unfunded acute beds which could all be closed if we achieved the Scottish
average length of stay through the SAFER programme. 
NHS Ayrshire and Arran is unusual in that our integration scheme leaves the risk for primary
care prescribing overspends and the associate cost pressure with the Health Board rather
than Integration Joint Boards.  In 2022/2023 the primary care prescribing volumes increased
by 2% which was budgeted for, however the price per item increased by over 10% which
was not budgeted for and resulted in a 2023/2024 cost pressure of about £12.5 million.  This
contributed to the underlying deficit position.   As part of the updating of the Integration

Page 59

Scheme finance leads requested for Integration Joint Boards to take full financial
responsibility from 2024/2025 for primary care prescribing and in 2024/25 finance leads
agreed to a shadow year.  However, as the year has progressed there is no consensus nor
partnership agreement that enables that transfer of this cost pressure and it remains an area
of discussion as part of the partnership agreement review.   
£11.3 million of the underlying recurring financial deficit has been in place since 2017/2018
and relates to a number of cost pressures in that year where the general allocation funding
uplift was 0.4% and the balance could not be met from efficiency savings.  In 2022/2023 this
deficit increased to £26.4 million as a result of unfunded Covid related costs and inflationary
and demand pressures.  
The core e-health infrastructure for NHS Ayrshire and Arran was very poor and therefore
there is a requirement to upgrade systems, make networks more secure and increase band
width to improve speed of connection.  A strategy of moving toward cloud based hosting (in
line with Scottish Government policy) comes with significant costs and is a revenue cost
pressure as opposed to capital cost for replacing servers etc.  The additional costs of
Microsoft Office 365 were only partially funded in previous years and therefore in 2023/2024
there was a cost pressure of £1.4 million for Microsoft Office 365 and in 2024/2025 a further
£0.5 million.  In addition there was a £3.15 million cost pressure for other system
infrastructure upgrades, additional digital staff and some cloud hosting of key systems in
2023/2024 with a further £0.5 million investment in digital in 2024/2025.
Historical Deficit Contribution £million
New medicines 8.8
Unfunded acute beds 12.5
Primary care prescribing 12.5
Pre pandemic deficit 11.3
Covid and inflationary pressures 15.1
Teams and digital investment 5.6
Total 65.8
In the 2024/2025 revenue plan, planned CRES of £24.1 million (plus sustainability funding
of £5.6 million) exceeded the cost pressures of £18.5 million by £11.2 million which reduced
the underlying deficit of around £54 million, however inflationary pressures on supplies
budgets and delays in CRES delivery have required non-recurring measures to live within
the £53.5 million deficit for 2024/25. The underlying recurring deficit remains similar to the
table above as some of the 24/25 CRES was not achieved recurringly and backfilling
measures are non-recurring.
Assessment
The energy cost increase over 2022/2023 and 2023/2024 amounted to over £5 million which
required a doubling of the recurring budget.  The £1.6 million further cost pressure in
2024/2025 was treated as non-recurring (in the expectation of a price fall) as was the clinical
negligence or risk indemnity scheme (CNORIS) contribution temporary increase of £1.1
million. 
Demand increased for pathology reporting which required extra reporting capacity to be
purchased from the private sector in 2023/2024 and 204/2025 at a cost of £0.5 million. 
Biochemistry test volumes from GPs have increased the cost of the managed service

Page 60

contract.
The integration scheme sets out the position in relation to the set aside budget that the
Integration Joint Boards should contribute financially if they are responsible for increased
use of acute services and an analysis of occupied bed days used by them on relevant
specialties show an increase by 22,000 compared to pre-pandemic.  Risk sharing in these
areas is an area of discussion between NHS Ayrshire and Arran and the Integration Joint
Boards as the Integration Schemes are being reviewed however the financial aspect of
commissioning will not be implemented in 2025/2026. 
Actions Being Implemented
Governance
The Board has re-set and strengthened the governance supporting and enabling CRES
creation and delivery, during 2024-25 with additional Programme Management support
provided by external contractors. 
Best practice documentation and the introduction of an Improvement Programme Steering
Group, which is the improvement delivery group reporting through to an Executive
assurance and delivery group (Financial Improvement Scrutiny Group).
Quality / Patient Care
The Corporate Management Team have approved a CRES approach based on the national
strategy ‘Delivering Value Based Health & Care; A Vision for Scotland’.  The Medical Director
is the Executive lead supported by the Recovery Director.  This will ensure clinical buy-in for
fundamental service change. 
The aim is to build out from the Realistic Medicine approach and implement a three year
programme that is a clinically led value-based efficiency approach to support delivery of the
medium-term efficiency programme.  The efficiency programme will run alongside the cost
reduction approach to reduce costs further. Enhanced performance management
arrangements and reporting will provide additional scrutiny and assurance.  To achieve the
latter an extension of the support from external contractors has been sought.
The average length of stay within the Ayrshire acute hospitals post pandemic has been
around 10 days which is significantly higher than the Scottish average and much higher than
that achieved in England.  Actions being taken to reduce the length of stay include pathway
reviews, training of clinical staff on SAFER methodology and cohorting of patients clinically
fit for discharge with more AHP and less medical input.  The wards where SAFER has been
introduced have seen a reduction in length of stay therefore it is being rolled out more widely.
Workforce
The use of agency staff is largely driven by the acute unfunded beds.  Agency nurse spend
for 2022/2023 was £10.6 million and reduced to £9.7 million in 2023/2024 with further
reduction projected in 2024/2025.  Medical agency has been around £6 million per annum
due to consultant vacancies, however has a target to reduce this by £1 million in 2025/2026. 
Both reducing agency and the closure of the unfunded beds are cost reduction rather than
cash releasing efficiency savings as there is no recurring budget for these.  A reduction in
sickness absence would reduce the need for agency staff.

Page 61

To support the CRES programme, there is a need to continue the Recovery Director in
2025/2026, supported by Programme Management and a Finance Business Partner.  We
are structuring the 2025/2026 plan around Realistic Medicine (Better Value Better Health)
to get strong clinical support and leadership of change. Individual schemes will be approved
through an Improvement Programme Steering Group which has strong operational
membership and each scheme will have a workbook and Quality Impact Assessment.  An
operation Programme Management Office within our Acute Directorate will comprise
Improvement Leads, Project Managers and will be supported by finance, HR, digital etc. 
Operational Grip and Control
Additional grip and control measures have been introduced during 2024-25 across core pay
and non-pay areas.  Each area being Director led. 
The Board is currently refreshing the bed demand model which will be used to inform the
relevant establishment (demand and supply) requirements from 2025-26.  Through this work
the whole system bed requirements will be better understood.
Integration and whole system working will improve from 2025-26 with a focus on population
health, public health and prevention with the aim of adopting an open book policy,
optimisation of the  Ayrshire resource budget, development of integrated pathways, to
support workforce transformation, clear Partnership Agreement underpinned by a clear risk
share and reward framework.
Financial
The financial plan details the CRES plan for 2025/26 which includes IJB CRES as these
count towards the 3% CRES target (although these do not offset any of the Health Board
cost pressures and a net 3% increase in funding for IJBs has been ‘passed through’). 
Tighter grip and control on non-pay spend through procurement controls, reducing waste in
theatre consumables, managing demand for laboratory tests, replacing taxis with community
transport provider for renal patients and reducing energy expenditure will reduce
overspending areas through cost reduction schemes.
To minimise the deficit, three parallel streams of work are needed:- 
• Reform of acute services to reduce length of stay, close speedily all unfunded beds (cost
avoidance) and thereafter close funded acute beds to release cash releasing efficiency
savings.
• Achievable cash releasing efficiency savings targets set for most Directorates (3%)
except Integration Joint Boards.  The savings template does not yet reflect all of these
as firm plans for savings and the pipeline is being validated to get a realistic target.
• Rebalance the financial risk between the Health Board and Integration Joint Boards in
relation to:- 
- primary care prescribing and overspends; and
- payments through set aside for acute beds occupied by delayed discharge patients. 
Risk Assessment / Management
Added unfunded beds have been a constant cost pressure for the Board and securing the
right sized bed-based for care in all care settings, remains a priority for the system.  This
work is being supported with the additional and experienced resources provided by external
contractors and remains an important part of the Boards sustainable recovery plan.

Page 62

For the first time our IJBs, North, South and East Ayrshire have raised concerns for the
sustainability of the services devolved to them.  Our IJBs no longer have financial reserves,
and North Ayrshire has required a year end settlement to break even.  The 3% uplift does
not cover the cost pressures for our IJBs and service reductions will need to be made which
will put further pressures throughout all parts of our system.  We will continue to work in
partnership, revised the partnership commission and secure an Urgent and Unscheduled
Care commission in order that system pressures are as transparent as they need to be.
It is acknowledged that any significant redesigns of service provision would require public
and clinical consultation, and Scottish Government support therefore cannot be
implemented speedily however a major driver for change is delivering a sustainable health
service within the envelope of funding available.  It is difficult to quantify the savings from
the above as the main driver is reduction in the acute bed base. 
Policy Drivers
A significant cost pressure for 2024/2025 is the New Medicines Fund where the cost of
medicines approved by the Scottish Medicines Consortium continually increases in line with
the Government policy to increase access to medicines.  This includes cystic fibrosis
medicines, end of life cancer drugs, orphan drugs and ultra-orphan drugs which have a very
high cost per quality adjusted life year.  A potential new cost pressure of £11 million for
injectable drugs for weight loss has not been included in the financial plan.
Limited investment for social care through our Local Councils.
Finance Projections
A three year financial plan has been developed showing detailed cost pressures for 2025/26
and estimates for future years.  Funding settlements for 2026/27 and 2027/28 are currently
unknown, however the assumption is that cash releasing efficiency savings of at least 3%
will be required each year.  The financial plan is to reduce the deficit to move towards
financial sustainability over a number of years, as major service change requires public
consultation and Scottish Government approval.