Integration Joint Board
19 June 2025
Subject: Older People’s Day Service Review
Purpose: To present to IJB the outcome of the review of the delivery of day
services for older people in North Ayrshire and to outline proposed
options to IJB to identify a service model for day services that
supports older people across North Ayrshire whilst meeting identified
savings target.
Recommendation: IJB to approve the recommendations: -
(i) note the outcome of the older people’s day service review
completed in February 2025
(ii) consider the option(s) detailed within this report for future
delivery and provide approval for the preferred option, noting the
described impact on service users and all other relevant
stakeholders.
(iii) note the requirement for a temporary pause on new day service
admissions whilst teams reconfigure service delivery and where
possible accommodate any service users affected by service
change.
(iv) consider and approve the preferred option between Option 1
and Option 2 as set out in the report.
(v) Note that the revised service model will undergo a formal
evaluation six months after reopening. This evaluation will assess
the effectiveness of service delivery, the impact on unmet need,
and identify any further areas for improvement. 
Direction Required to
Council, Health Board or
Both
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
IJB Integration Joint Board
PSMT Partnership Senior Management Team 
1. EXECUTIVE SUMMARY
1.1 The current model of delivery of older people’s day services has been identified within
the Health and Social Care Partnership’s transformation plan for review and has been
allocated a target to achieve a recurring annual financial saving – this was initially
identified as £200k however was increased to £307k as agreed by IJB in March 2025.
This has been implemented so far in a phased basis, with £100k saving in year one

Page 2

and a further £207k saving now required in year two, over the period 2024/25 –
2025/26. The full review paper attached was completed prior to the final savings
target being determined, and as such there are some variations in detail.
1.2 Year one savings were achieved by pausing the Partnership’s day services outreach
development and by not recruiting to vacant outreach posts; as the future of the
outreach service required to be considered as part of the full review. A recurring
saving of £307k is required to be identified and achieved from year two onwards to
deliver the full savings target. There are risks to achieving this full saving from year 2
due to timescales in implementing any service change.
1.3 Budget savings within older people’s day services totalling £126k have previously
been implemented between 2019 and 2022 – these savings saw an overall reduction
in day care provision at the time. It was always the intention to undertake a further
phase of review particularly as the new service provision leaves an inequity of
provision with two building-based services in the Three Towns locality.
1.4 A comprehensive consultation on day services was completed in 2021 to facilitate the
remobilisation of day services (post covid). The most recent review of day services
(2024/25) focussed on effective engagement with staff, service users, families and
carers. In December 2024, service users were surveyed to gain an understanding of
the quality of the day service intervention. Day service aims, outcomes and criteria for
access were reviewed. Service demand, attendance figures and financial costs were
all taken into consideration at this review.
1.5 Following the outcome of the review earlier this year, three options for Day service
delivery were presented to the Partnership Strategic Management Team on 27
February 2025 for consideration. The full review document is included as Appendix 1,
a summary of the options presented at that time is detailed below: 
Closure of Thistle Day Service (HSCP operated day service)
• Thistle Day Service in Stevenston was viewed as an option for closure due
to its proximity to the Alzheimer Scotland service in Ardrossan.
• The closure of Thistle Day Service would result in the loss of 70-day service
placements per week, reducing local support in the Three Towns locality,
particularly for frail elderly residents who do not have a memory impairment.
• This option would provide an annual saving of circa £145k. 
Discontinuation of Alzheimer Scotland Daycare Contract
• This option proposed discontinuing the Alzheimer Scotland daycare contract
at its expiry date (currently extended until August 2025), the service
operates from a NAC owned property. This would generate current contract
savings of approximately £276k per year and approximately £54K in income
from service-user charges - this income is currently retained by Alzheimer
Scotland.
• This option would most likely result in the closure of the Alzheimer Scotland
service in Ardrossan and would result in the loss of 63 commissioned day
care places on a weekly basis. 
Redesign of both the Partnership and Alzheimer Scotland’s older people’s day service
delivery functions 
This option proposed a significant shift and change in the delivery of both day services
and dementia services in North Ayrshire.

Page 3

These changes would include:
• Alzheimer Scotland would move away from a traditional day service model
and instead focus on a model of delivery prioritising befriending services,
dementia daycare outreach at home, and provision of increased support for
carers of loved ones with dementia.
• Outreach day services previously planned for Partnership delivery would
now be provided by Alzheimer Scotland under this revised model only for
adults with a memory impairment – there would be no outreach provision for
frail older people.
• All older people's (building based) day services would be delivered by the
Partnership.
• Saving of approximately £212k would be generated by not recruiting to
Partnership vacancies identified for Outreach provision and a reduction in
Alzheimer Scotland funding from £276K to £140K per annum.
• Funding would be allocated to increase staffing levels within existing HSCP
day services to mitigate some of the impact of the loss of 63 commissioned
day care placements. 
The PSMT favoured the option to redesign the Partnership and Alzheimer Scotland’s
day service delivery functions as it was considered that whilst there would be an
overall reduction in day service provision and net reduction in weekly day care places
available, this option served to both satisfy the requirement associated with savings
and also maintain maximum service delivery within the financial resource available,
whilst retaining the service and partnership with Alzheimer Scotland. 
After discussions at PSMT in February 2025, an additional £107k savings target was
approved as part of the IJB budget in March 2025 from the Day Service budget and
as such this report will provides alternative options to deliver the savings in full.
1.6 Taking the feedback from consultation and the full day service review into
consideration, it is deemed critical that in-building day services remain available to
older people that are locality based and in their own communities.
1.7 The HSCP has commenced initial discussions with Alzheimer Scotland on a proposed
new model based on the feedback from the Partnership’s Senior Management Team
and the alignment of this with Partnership operated day services. Further meetings
are expected to take place with representatives from Alzheimer Scotland in the coming
weeks to discuss options. The current contract with Alzheimer Scotland expires at the
end of August 2025.
1.8 The IJB are asked to consider two Options presented in this paper and following the
review: 
Option 1:  Discontinuation of Alzheimer Scotland Day Care Contract in full from the
end of August. Removal of plans to introduce any outreach day care opportunities in
North Ayrshire, with some reinvestment of funding directed to enhance staffing within
building-based day care resource. Financial Impact – delivers full year saving of £340k,
above the £307k target. 
Option 2:  Redesign of both the Partnership and Alzheimer Scotland’s older people’s
day service delivery functions. Commissioned provider would transition from traditional
day service model and instead focus on a model of delivery prioritising befriending
services, dementia daycare outreach at home, and provision of increased support for
carers of loved ones with dementia. All older people's (building based) day
services would be delivered by the Partnership. Financial Impact - delivers full year
saving of £212k, a shortfall of £95k and would require the recurring savings target to

Page 4

be formally reduced by the IJB with savings identified from other areas, this should be
considered in the context of the wider financial challenges facing the IJB. 
IJB are asked to consider the two options presented and agree the preferred way
forward, noting the financial and service implications of both.
2. BACKGROUND
2.1 Day services in North Ayrshire provide activities and support for adults assessed as
requiring support who may feel isolated and lonely, have mobility issues and would
benefit from regular social contact with others with transport provided from the
person’s home to the day centre if appropriate. 
The aim of day services is:
• to provide a safe, flexible, therapeutic and homely environment for service
users, their families and significant others, according to their assessed care
needs; and
• to provide the highest possible quality social care and act in the best interest
of people, by maximising their independence and helping them participate fully
in their family and community. 
The Partnership’s in-house day service provision is delivered within identified day
service premises which are open 9am to 4.30pm, Monday to Friday, staffed by
specially trained professionals. These day services are delivered by social care staff
from sites in Largs, Irvine, Garnock Valley and the Three Towns. Previously, a service
was delivered in Cumbrae, but this service is no longer operational. 
Stronach Day Service on Arran, located within Montrose House Care home, has been
closed since the pandemic. A recent review led to a pilot outreach model which ran
from May 2023 to March 2024 and was conducted in two phases in two localities on
the island. The pilot served a small number of users and received positive feedback
for its social benefits and respite for carers. However, it relied on existing staff, making
it unsustainable due to the current and ongoing workforce challenges on the island. 
It is therefore recommended to fully adopt an outreach model for day services on
Arran, removing onsite day care. However, the service should only be provided when
staffing allows thus addressing recruitment and resource challenges. A phased
implementation should aim to serve up to six users by the end of 2025, noting
however this will be entirely staffing dependent. It is suggested that a short life
working group is established to develop detailed plans and oversee the phased
implementation of this.
2.2 The 4 mainland Partnership day services provide supports from Monday to Friday
and offer a total of 350 spaces each week. On average these units run at over 95%
capacity and provide services to both frail older adults as well as older adults with
dementia. 
The current capacity of the mainland in-house day service provision is detailed
below: 
Day Service Locality Capacity
per day
Total
weekly
places

Page 5

Burns Irvine 22 110 
Gowanlea Kilbirnie 20 100 
Thistle Stevenston 14 70 
Stevenston Day Care and Resource
Centre
Largs 14 70 
2.3 In addition to the Partnership operated day services, there is one externally provided
day service located in North Ayrshire which is operated by Alzheimer Scotland. This
service is in the Harbour Centre, Ardrossan. This service is delivered 7 days per week
and provides services to older adults with dementia. 
Day Service Locality Capacity
per day
Capacity
per week 
The Harbour Centre Ardrossan 9 63     
2.4 The Partnership currently funds the provision of this day service alongside funding
provided by Alzheimer Scotland. The building is owned and maintained by North
Ayrshire Council. Whilst no revenue is received by North Ayrshire Council for this
property it should be recognised that Alzheimer Scotland have invested in this building
which includes the installation of a new kitchen in 2024 and garden improvements.
3. CURRENT SITUATION
3.1 The Partnership is committed to promoting independence across all areas of service
provision and seeks to ensure as many people live as independently as possible within
their own communities. In line with the aspirations of the Partnership’s Strategic Plan,
the Partnership is developing modern, flexible, financially sustainable approaches that
will support people and their carers to remain independent and enabled to lead
fulfilling lives. 
The demographic projections of the rise in older people, health outcomes for people
living in North Ayrshire, the pressure on financial resource and changing expectations,
means that services must be redesigned to meet demand and minimise unmet need
within our older population whilst operating within the resources available. Services
also need to ensure that capacity is aligned to meet the needs of the individuals who
require to access services. 
Building based day services, while beneficial for some, may not be suitable for
everyone due to barriers such as accessibility, transportation challenges, sensory
sensitivities, or social anxiety. These settings can unintentionally exclude individuals
who find structured environments overwhelming or who live in remote areas. Outreach
day services offer a more flexible and person-centred approach by bringing support
directly into the community or home. This mixed model allows for tailored engagement
that respects individual preferences, cultural backgrounds, and unique needs,
fostering greater inclusion. A mixed model of day service provision can ensure that
support is accessible and inclusive for all.
3.2 Workforce 
There are 36 posts associated with the Partnership’s inhouse older people’s day
services within North Ayrshire including transport staff who provide transport for the
majority of service users to and from the day centres. 
The current Day services staffing compliment consists of: 
• Day Care Co-ordinator
• Senior Day Care Officers

Page 6

• Day Care Officers
• Drivers
• Day Care Escorts
3.3 There are 9 posts associated with the delivery of the Alzheimer Scotland Day service.
The impact of the proposal on these posts is not known currently as these staff are
employed by Alzheimer Scotland.
3.4 Waiting List 
There are currently 103 people on the waiting list for the older people’s day services
as outlined below however this can change on a weekly basis: 
4 ASSESSMENT
4.1 This report, based on the findings contained within, would summarise that older
people day services within North Ayrshire are a vital service and support in achieving
the Partnership’s strategic aims of “all people who live in North Ayrshire are able to
have a safe, healthy and active life”.
4.2 By ensuring building-based day service provision continues in all localities, across all
groups for adults over the age of 65, travel time and associated barriers are
significantly reduced, enabling easier and more consistent access for frail older adults
and those living with dementia, whose needs could best be met by a building-based
day service delivery model. These services foster stronger community connections,
reduce isolation, and promote a sense of belonging and continuity for service users. 
In-house day services offer the most cost-effective model, delivering best value
through efficient use of resources and robust waiting list management. 
Location Unit Provider Weekly
Capacity
Daily
Capacity
Spaces
Allocated (May
2025) 
Ardrossan
Harbour
Centre
Alzheimer
Scotland  63  9  46 (73.0%) 
Irvine
Burns Day
Service
In-House
(NAHSCP)  110  22  104 (94.5%) 
Kilbirnie
Gowanlea
Day Service
In-House
(NAHSCP)  100  20  92 (92%)

Page 7

Largs
Stevenson
Day Service
In-House
(NAHSCP)  70  14  67 (95%) 
Stevenston
Thistle Day
Service
In-House
(NAHSCP)  70  14  66 (94%) 
Partnership day service staff play a critical role not only in direct care delivery but also
in supporting wider service continuity plans, stepping in during periods of staff
shortages or emergencies to maintain consistent care across the system. This
integrated, community-based approach ensures resilience, responsiveness, and a
high standard of care for North Ayrshire’s older population.
4.3 Alzheimer Scotland are Scotland’s national dementia charity and its work both nationally
and throughout North Ayrshire is recognised and valued. Alzheimer Scotland have
provided supports and services to older people in North Ayrshire for several years and
are a key component in supporting people living with dementia in the North Ayrshire
community.
4.4 In consideration of the recent review, and views gathered through the Partnership’s
Senior Management Team, the below final recommendations are presented to the IJB
for final consideration.
4.5 Option 1 
Discontinuation of Alzheimer Scotland Day Care Contract in full - this option would see
the end of the Alzheimer Scotland daycare contract at its renewal date at the end of
August 2025 and would result in the closure of the Alzheimer Scotland day care
provision within The Harbour Centre in Ardrossan. This option would require
permanent removal of plans to introduce any outreach day care opportunities in North
Ayrshire, with some of the funding for previously allocated outreach supports in the
Partnership directed to enhance staffing within building-based day care resource. 
Pro’s
• Potential to over-achieve full year savings target from 26/27 (dependent on
additional income).
• Will ensure retention of building-based day services (provided by HSCP) in
each of the mainland locality areas to adults over 65 with both memory
impairment and physical disability.
• Streamline resources and ensure flexible, resilient in-house day service
provision.
• Opportunities to mitigate some of the risk of increased waiting lists and service
closure by enhancing capacity in Partnership day services. 
Con’s
• Negative impact on current provider, Alzheimer Scotland.
• Impact on current users of the Alzheimer Scotland service and families/carers.
• Loss of weekend provision.
• No outreach supports.
• Loss of specialist service and Alzheimer Scotland provision in North Ayrshire.
• Loss of 63 weekly day care placements.
• Increase in waiting lists and unmet need for access to day care provision. 
Mitigation
• Funding will be directed to the Partnership’s inhouse day care centres to
enhance capacity and offer building-based day care opportunities for adults

Page 8

affected by the Alzheimer Scotland closure – the has the potential to limit the
impact of an overall reduction in day care places for older people to around 30
places on a weekly basis.
• A review of day care support for any affected service users will be undertaken
prior to any service change -which would include consideration of reinvestment
in day services or our Dementia Support Service.
• Alzheimer Scotland currently provides day services over a 7-day period whilst
the Partnership’s day services are delivered Monday to Friday; however, uptake
for weekend services has been consistently low, with poor attendance observed
during these times. Given this trend, it is anticipated that the impact of
discontinuing building-based provision over the weekend would be minimal.
• Currently, in-house day services have a greater capacity and make more
efficient use of available spaces daily – operating at 95% capacity compared to
Alzheimer Scotland who have been operating at 73% capacity. Shifting to a
fully in-house daycare service model will offer opportunities for enhanced
flexibility in service delivery and staffing. 
Financial Implications
• This would generate current contract savings of approximately £276k per year
with potential for approximately £54k additional income from service-user
charges if existing Partnership Day services can be expanded to provide
additional day care placements - this income is currently retained by Alzheimer
Scotland.
• It is anticipated that 3 x additional part-time Day Care Officers would be
required to supplement additional attendees within NAHSCP day services.
Total cost for this provision per annum would be £87,000 and has been
accounted for in savings projection.
• Full in year savings are unlikely to be achieved for 2025/26 due to the part
year impact of the service with a shortfall of around £90k.
4.6 Option 2 
Redesign of both the Partnership and Alzheimer Scotland’s older people’s day service
delivery functions - this option proposes a significant shift and change in the delivery
of both day services and dementia services in North Ayrshire. Under these changes
Alzheimer Scotland would move away from a traditional day service model and instead
focus on a model of delivery prioritising befriending services, dementia daycare
outreach at home, and provision of increased support for carers of loved ones with
dementia. Outreach day services previously planned for Partnership delivery would be
provided by Alzheimer Scotland under this revised model only for adults with a
memory impairment – there would be no outreach provision for frail older people. All
older people's (building based) day services would be delivered by the Partnership. 
Pro’s
• Will ensure retention of building-based day services (provided by HSCP) in
each of the mainland locality areas to adults over 65 with both memory
impairment and physical disability.
• Streamline resources and ensure flexible, resilient in-house day service
provision.
• Continues specialist dementia service.
• Facilitates outreach and befriender service.
• Support for family and carers.
• Opportunities to mitigate some of the risk of increased waiting lists and service
closure by enhancing capacity in Partnership day services.
• Alzheimer Scotland would continue to retain use of the Harbour Centre as a

Page 9

base for which to deliver their services.
• Savings would be made by Alzheimer Scotland in terms of transport and meal
provision costs if the service were to move to an outreach model.
• There are benefits of a blended approach to day service delivery through
supporting more individuals via remote support and outreach visits which
would reduce levels of unmet need. 
Con’s
• Negative impact on current provider, Alzheimer Scotland who may not choose
to enter a contract to deliver an alternative model.
• Impact on current users of the Alzheimer Scotland service and families/carers
• Loss of weekend provision.
• Loss of 63 weekly day care placements.
• Increase in waiting lists and unmet need for access to day care provision.
• Would not achieve full savings target. 
Mitigation
• Funding will be directed to the Partnership’s inhouse day care centres to
enhance capacity and offer building-based day care opportunities for adults
affected by the change in Alzheimer Scotland service – the has the potential to
limit the impact of an overall reduction in day care places for older people to
around 30 places on a weekly basis.
• A review of day care support for any affected service users will be undertaken
prior to any service change.
• Alzheimer Scotland currently provides day services over a 7-day period whilst
the Partnership’s day services are delivered Monday to Friday; however, uptake
for weekend services has been consistently low, with poor attendance observed
during these times. Given this trend, it is anticipated that the impact of
discontinuing building-based provision over the weekend would be minimal.
• Currently, in-house day services have a greater capacity and make more efficient
use of available spaces on a daily basis – operating at 95% capacity compared
to Alzheimer Scotland who have been operating at 73% capacity. Shifting to a
fully in-house daycare service model will offer opportunities for enhanced
flexibility in service delivery and staffing.
• Savings would be made by Alzheimer Scotland in terms of transport and meal
provision costs if the service were to move to an Outreach model.
• If current provider does not choose to enter into an alternative model and
funding arrangement through a revised contract from September 2025,
alternatives will be considered including an open procurement process or
through an in-house delivery model through day services and dementia
support. 
Financial Implications
• This option would generate savings of approximately £212k per year, £95k less
than the identified saving of £307k – this saving would be generated by not
recruiting to Partnership vacancies identified for Outreach provision and a
reduction in Alzheimer Scotland funding from £276K to £140K per annum.
• It is anticipated that 3 x additional part-time Day Care Officers would be
required to supplement additional attendees within NAHSCP day services.
Total cost for this provision per annum would be £87k and has been accounted
for in savings projection.
• Full in year savings are unlikely to be achieved for 2025/26 due to the part
year impact of the service with a shortfall of around £107k.

Page 10

4.7 Discussions with Alzheimer Scotland have already commenced and in consultation
with the Partnership, Alzheimer Scotland have agreed to provide an outline proposal
for a potential future service delivery model within North Ayrshire in line with Option 2.
4.8 Considerations for future commissioning are ongoing and it has yet to be confirmed
whether a full tender for the future provision of any agreed commissioned service
would be required. This may have an impact on who the future provider of Option 2
is, should this be the outcome.
4.9 In order to ensure capacity within the Partnership’s day services for any service users
affected by the service change it will be required to pause any new admissions to from
end June 2025, with all non-critical referrals being added to a day services waiting list.
4.10 Anticipated Outcomes 
It is anticipated that this proposal will ensure a more financially sustainable model of
day service provision within North Ayrshire, whilst protecting the delivery of crucial day
service supports for residents of North Ayrshire and their carers. By continuing to work
in partnership with all stakeholders, the described approaches will promote the
ongoing sharing of knowledge and expertise and a more equitable approach to access
to services across North Ayrshire.
4.11 Measuring Impact 
The service will continue with an ongoing programme of stakeholder engagement –
including engagement with day service staff, service users, carers and care providers,
to gather feedback on any changes made to the day service model.
5. RECOMMENDATIONS 
This report, in consideration of current needs across Health and Community Care
Services, would recommend that the IJB: 
• note the outcome of the older people’s day service review completed in
February 2025.
• (consider the option(s) detailed within this report for future delivery and provide
approval for the preferred option, noting the described impact on service users
and all other relevant stakeholders.
• note the requirement for a temporary pause on new day service admissions
whilst teams reconfigure service delivery and where possible accommodate
any service users affected by service change.
• consider and approve the preferred option between Option 1 and Option 2 as
set out in the report.
• Note that the revised service model will undergo a formal evaluation six months
after reopening. This evaluation will assess the effectiveness of service
delivery, the impact on unmet need, and identify any further areas for
improvement.
6. IMPLICATIONS
6.1 Financial
Option 1 would deliver the full approved savings target for the day services review.
Option 2 would not meet the approved savings target of £307k and would leave a
recurring budget gap of £95k which would require to be added to the IJB overall gap
with savings identified from other services.

Page 11

6.2 Human Resources
There may require to be recruitment to address gaps in staffing in Partnership Day
services. 
The effect on staffing within Alzheimer Scotland day service provision is not known at
this time and would be managed as part of any exit from or change to contract.
6.3 Legal
Potential impact in relation to Alzheimer Scotland workforce.
6.4 Equality
An Equalities Impact Assessment has been completed in relation to these proposals.
6.5 Children and Young People
None.
6.6 Environmental & Sustainability
None.
6.7 Key Priorities
This report, based on the findings contained within, would summarise that older
people day services within North Ayrshire are a vital service and support in achieving
the Partnership’s strategic aims of “all people who live in North Ayrshire are able to
have a safe, healthy and active life”.
6.8 Risk Implications
The risk implications are detailed within the report.
6.9 Community Benefits
Revised model(s) of services will allow for continued opportunities to build strategic
links between the Partnership including other Community Care Services, Housing and
Connected Communities. 
7 CONSULTATION 
7.1 The options were considered and future provision discussed with stakeholders as part
of the recent review of day services for older people in North Ayrshire.
7.2 The PSMT has been consulted on the options described within this report. 
8. CONCLUSION 
8.1 IJB are asked to consider the outcome of the day services review, and considering the
two Options presented for consideration within the report advise on which Option is
preferred to allow for an effective implementation period. 
For more information, please contact Kerry Logan, Head of Service, HCC on [01294
317805] or [klogan@north-ayrshire.gov.uk]

Page 12

February 2025 
North Ayrshire Health and
Social Care Partnership Older
Peoples Day Service Review
AN OPTIONS APPRAISAL

Page 13

1
Contents
Introduction .................................................... 2
Engagement ............................................... 4
Landscape Review ........................................ 5
Service Overview .......................................... 6
Aims ............................................................ 7
Access Criteria .......................................... 8
Service User Experience.......................... 9
Feedback ................................................ 9
Transport .............................................. 14
Catering ................................................ 14
Referrals ................................................... 15
Staffing ...................................................... 15
Demand ........................................................ 16
Attendance ............................................... 16
Options Appraisal ........................................ 20
Status Quo / Do Nothing ........................ 20
Relocate Day Services to Community
Hubs .......................................................... 20
Cease Outreach Daycare Provision ..... 20
Increase Charge for Service .................. 21
Three Towns Colocation ........................ 22
Permanently Close Thistle Day Service
................................................................... 23
Discontinue Alzheimer Scotland Daycare
Provision ................................................... 24
Redesign Partnership & Alzheimer
Scotland Service-Delivery Roles ........... 26
Appendices .................................................. 28
Charter of Rights ..................................... 28
Day Service Space Requirements ........ 29
References ................................................... 32

Page 14

2
Introduction
1. The current model of delivery of older people’s day service has been identified
within the HSCP transformation plan for review and has been given a target to
achieve a recurring financial saving of £200,000. This has been implemented in
a phased basis, with £100,000 saving in year one and a further £100,000 saving
in year two, over the period 2024/25 – 2025/26. Year one savings were achieved
by pausing the day services outreach development and by not filling outreach
posts; however, the future of the outreach service requires to be considered as
part of this review.  A recurring saving of £200,000 must be identified from year
two onwards.
2. This paper will consider the day services model across North Ayrshire and
describe the options appraisal exercise (see Chapter ‘Options Appraisal’) that
evaluated several options to identify a sustainable service model for introduction
in the short to medium term, one which would realise the necessary savings and
ensure the ongoing provision of valued day service supports to older people in
North Ayrshire. 
3. The recommended option as an outcome of this review is to Remove Outreach
& Change Alzheimer Scotland’s Role.   This approach would achieve the
necessary budget savings while continuing to offer a wider range of services and
supports to the families of older people across North Ayrshire and specifically for
those with dementia. Careful management on this proposal and resultant service
change would be required to mitigate the negative impacts on service users,
including familiarising them with alternative units and managing the transition
smoothly. Further engagement with stakeholders is essential to ensure a
successful implementation and to address any concerns that may arise. This
option balances the need for cost savings with the goal of maintaining service
quality and accessibility for users.  
TABLE 1: SUMMARY OF OPTION'S APPRAISAL RECOMMENDATIONS
Option Summary Recommended
Status Quo / Do
Nothing 
Continue with current model of delivery inclusive of
Daycare provision across all mainland localities and
contracted Alzheimer Scotland provision with the
full roll out of the Outreach service. This would not
generate any financial savings.
No
Relocate to
Community Hubs
Move physical location of day service provision into
the community hubs (within sheltered housing
units).  This may realise some building-based
savings however this would be minimal, and a
review has taken place confirming the physical
layout of the community hubs do not meet the
requirements for daycare provision.
No

Page 15

3
Option Summary Recommended
Cease Outreach
Day care
provision
Continue with current model of delivery inclusive of
Daycare provision across all mainland localities and
contracted Alzheimer Scotland provision with the
permanent removal of the planned Outreach
service.  This would not achieve the full financial
saving and loss of this service will increase demand
on other, more costly, services.  
No 
Permanently
close Thistle Day
Service  
Permanently close Thistle Day Service which
currently operates in the Three Towns locality
providing approx 70 day service places on a weekly
basis.  The cons significantly outweigh the benefits
in this option and introduce the risk of negative
publicity, increased demand on other more
expensive services, increased social isolation for
service-users and inequality in access to services
for those living in the Three Towns locality.     
SMT
Consideration
Discontinue
Alzheimer
Scotland
Daycare
provision 
Alzheimer Scotland currently provide daycare
services to adults with Dementia in the Three Towns
locality. Whilst the cons of this option significantly
outweigh the benefits, many could be managed and
mitigated. This option would achieve the necessary
savings however there would be significant impact
on overall service provision moving forward.  PSMT
have agreed to a contract extension of six months,
which will reduce Year 2 savings by approximately
£121k.  Conversely, discontinuing Alzheimer
Scotland could send the message to local people
that the HSCP do not feel it is necessary or
appropriate to employ nationally recognised
specialist Dementia care in the area.  
SMT
Consideration
Three Towns
Colocation
Co-locate Three Towns Daycare provision by
merging day services provided by the Partnership
and Alzheimer Scotland in the Thistle Day Service
building in Stevenston.  This may realise a level of
savings due to economies of scale for example
transport, meals and staffing however having
scoped this it is unlikely to be viable.  This is due to
the layout of the unit meaning it would not be
possible to operate two separate services using
common facilities simultaneously whilst employing
different policies and procedures.  
No

Page 16

4
Option Summary Recommended
Redesign
Partnership and
Alzheimer
Scotland delivery
roles.
This is the only option where the ‘pros’ outweigh the
‘cons’.  Moving forward, this option would achieve
the necessary savings and, if managed effectively,
limit the impact on the displaced service users who
would be introduced to alternative day services or
receive alternative services from Alzheimer
Scotland.  This option allows the Partnership to offer
a wider range of services to the families of people
with Dementia, mitigating the loss of Outreach
Support whilst offering a solution to those people
who cannot access traditional Day Services.  This
option would also allow HSCP the opportunity to
review current dementia service provision,
minimising duplication of provision and offer a wider
range of services to the residents of North Ayrshire. 
SMT
Consideration
*LIMITED INTRODUCTION OF THESE OPTIONS COULD BE USED IN THE SHORT-TERM TO ‘SHORE UP’ PREFERRED
SOLUTIONS WHICH MAY FALL SLIGHTLY SHORT OF THE YEAR 2 SAVING TARGET
4. The paper also considers known challenges to service delivery, and where action
is required to address these a ‘To Do’ icon is placed in the margin. 
5. While this is a standalone project, its outcomes will link to, and flow into,
forthcoming ‘Dementia Support and Respite Models of Care’ work.  
6. This project supports HSCP strategic delivery stated in the Strategic
Commissioning Plan, that “Our Transformation Plan sets out our key areas of
focus for redesigning and improving our services and business processes…
across all service areas with the aim of ensuring the Partnership continues to
deliver effective and cost-efficient services.”
Engagement
7. It is recommended that consideration is given to the preferred option and if
deemed suitable, further engagement is undertaken with key stakeholders in
2025:  
 Alzheimer Scotland,
 Carers Development Officer,
 Carers Service, 
 Day Services Staff,
 Dementia Support Staff,
 Mental Health Team,
 SDS Policy Review Manager,
 Service Users and their families,
 Social Work.
TO DO

Page 17

5
Landscape Review
8. A 2018 paper [1] found that “for older people with long-term conditions, regular
structured activities within a community setting meeting others are thought to
improve well-being and quality of life.” However, it also noted that “there is little
known about outcomes of day care provision.” The study examined the
outcomes of day care provision, focusing on three areas:
 Physical functioning: Findings from limited studies indicated a “trend for
positive impact… when activities are incorporated into a day care
programme.”
 Intergenerational provision:  a “small number of studies suggest positive
benefits.”
 Measurement of outcomes:  One study suggested that “attendance at day
care could reduce hospital attendance and admissions.”
9. Another 2018 study [2], found that “day centres are life-enriching gateways,” with
benefits felt by attenders, their family carers, and centre volunteers. The paper
notes that day centres “offer added value beyond the purposes for which they
are commissioned or funded, beyond what may be assumed to be covered by
an aim of improving quality of life or supporting people to remain at home,
beyond what attenders may have expected, given their reasons for attending.”
The study found that “day centres are not stigmatised or perceived as outdated.”
10. A 2020 [3] study states that day centres “were found to play a variety of roles for
individuals and in care systems,” with most evidence pointing to “social and
preventive outcomes.” The study found that “attendance and participation in
interventions…impacted positively on older people's mental health, social
contacts, physical function, and quality of life.” However, the report also noted
that the research was based on evidence sourced outside the UK, and that the
impact of day centres on “older people without dementia” is under-researched.
11. Given the limited evidence to support day services through research, it is
imperative that consideration is given to service-user feedback for HSCP-
provided day services (see page 9).

Page 18

6
Service Overview
FIGURE 1: MAP OF NORTH AYRSHIRE WITH DAY SERVICE UNITS INDICATED 
12. North Ayrshire Health & Social Care Day Services are currently provided at five
locations across the area (Figure 1). The daily charge for service-users is £16.49,
it is anticipated charge will rise to £19.79 from April 2025 with further increases
anticipated throughout 2026/27.
13. Previously, a service was delivered in Cumbrae, but it has been confirmed that
this is no longer operational.
14. The day service on Arran has been closed since the pandemic. A review led to
a pilot outreach model from May 2023 to March 2024, conducted in two phases:
Blackwaterfoot and Stronach Day Service in Montrose House, Brodick. The pilot
served a small number of users and received positive feedback for its social
benefits and respite for carers. However, it relied on existing staff, making it
unsustainable.
Burns Day
Services,
Irvine
Stevenson
Day Services,
Largs Gowanlea Day
Services,
Kilbirnie
Thistle Day
Services,
Stevenston
Harbour Centre
(Alzheimer’s.
Scotland),
Ardrossan

Page 19

7
15. It is therefore recommended to adopt a fully outreach model for day services on
Arran, eliminating onsite day care. However, service should only be provided
when staffing allows thus addressing recruitment and resource challenges. A
phased implementation should aim to serve six users by the end of 2025. It is
suggested that a short-lived working group is established to develop detailed
plans and oversee the phased implementation.
FIGURE 2: PROFILE OF MAINLAND SERVICES (SOURCE: HSCP DAY SERVICES TEAM)
Location Ardrossan Irvine Kilbirnie Largs Stevenston
Unit Harbour
Centre
Burns
Day
Service
Gowanlea
Day
Service
Stevenson
Day
Service
Thistle Day
Service
Provider Alzheimer
Scotland
In-House
(NAC)
In-House
(NAC)
In-House
(NAC)
In-House
(NAC)
Hours 09:00 –
16:30
09:00 –
16:30
09:00 –
16:30
09:00 –
16:30
09:00 –
16:30
Days
7 day (less
2 weeks at
Christmas)
Mon-Fri
(less 8
public
hols per
annum)
Mon-Fri
(less 8
public
hols per
annum)
Mon-Fri
(less 8
public hols
per
annum)
Mon-Fri
(less 8
public hols
per annum)
No of Staff (FTE)* n/a 8 7 5.5 5.5
Capacity (weekly) 63 110 100 70 70
Capacity (daily)** 9 22 20 14 14
Current Waiting List
(and those waiting on
2nd day) on 26 Feb
2025
6
(1)
54
(36)
15
(14)
9
(5)
14
(6)
Total Places Allocated
(February 2025)
50
(80%
capacity)
110
(100%
capacity)
100
(100%
capacity)
70
(100%
capacity)
70
(100%
capacity)
Income Generated
(current rate £16.49
per day) 
n/a £94,322 £85,748 £60,024 £60,024
Income Generated
(new rate £19.79) n/a £113,198 £102,908 £72,036 £72,036
Expenditure  £242,153 £338,640 £265,841 £208,207 £286,582
*ALL UNITS ALSO HAVE AN ADDITIONAL 2 BUS DRIVERS ALLOCATED TO THEM
** CAPACITY FOR BURNS & GOWANLEA IS UNDER REVIEW BUT IS LIMITED BY THE TRANSPORT AVAILABLE FOR
SERVICE USERS WHO REQUIRED TO BE COLLECTED AND DROPPED OFF.  STEVENSTON RESOURCE CENTRE,
LARGS IS ALSO CURRENTLY UNDER REVIEW DUE TO STAFFING LEVELS AND BUILDING SPACE. THISTLE DAY
SERVICES, STEVENSON IS CURRENTLY AT FULL CAPACITY.  
BUDGET CODES FOR DAY CARE INCOME ARE 10 218043/044/045 & 046 ACCOUNT CODE 60145. INCOME RECEIVED
TO THESE CODES IN FY 2324 WAS £118,421 BUT ALSO INCLUDES COSTS FOR NON-PC - ANALYSIS AVAILABLE VIA
BUSINESS UNIT [4]
Aims 
16. The aim of the Day Service is described in both the most current Policies and
Procedures [5] and in the leaflets issued to service-users about the service.  The
leaflets offer the most current definition.    
TO DO

Page 20

8
TABLE 2: DEFINED AIMS OF DAY SERVICE & SOURCE OF INFORMATION
Day Service Policy &
Procedure
Service-User Information Leaflet
Maintain older people at
home in their local
community by
promoting/maintaining
their independence
through therapeutic
interventions which meet
their physical, social, and
psychological needs.
Service provision should
be of a high standard,
flexible in its approach with
an emphasis on value for
money and delivered in a
safe environment.
Provides day services for adults aged 65 and over, offering a
homely and therapeutic environment. We aim to support
people to remain in their own homes and to be part of their
wider community. Our objectives are: 
 To assist people to remain in their own home 
 To promote social stimulation and prevent
isolation. 
 To provide a source for social care and health 
 To promote the maintenance of daily living skills 
 To contribute to rehabilitation 
 To provide specialist care for people with
cognitive impairment 
 To provide support and information to carers 
17. Service delivery is centred on an established ‘charter of rights’ [5] for service-
users. These rights are predicated on the belief that each person is an individual
and that society should respect that individual and his or her fundamental rights
as a citizen (see Appendices, page 28).
18. It should be noted that the Policy & Procedures governing Day Services should
be refreshed, as the most current version dates to 2005.  There is a need to
ensure they continue to comply with current legislation, guidance, and corporate
policies.
Access Criteria
19. Clients referred to day services will be accepted if they [5]::
 Are aged 65 years or over at the time of referral. However, younger
clients may be considered if their needs can be met through day services
activities on a short-term basis. 
 Require reintegration into the community (eg. post-hospital discharge)
 Are in bereavement.
 Are recovering from a debilitating illness.
 Require rehabilitation in activities of daily living.
 Are socially isolated from their peer group.
 Are physically disabled, sensory impaired, or have poor mobility.
 Need promotion of mental health status (e.g., depression, low self-
esteem)
 Are suffering from mild to moderate dementia.
 Have mild to moderate learning disabilities and suffer from one or more
of the above conditions.
TO DO

Page 21

9
Service User Experience
20. In December 2024, service users in each unit were surveyed to gain an
understanding of the quality of the Day Service intervention.  Service users were
asked a series of questions by staff from their own unit and required to give those
staff members their response in order that an e-form could be completed.  
21. This approach could introduce some anomalies if service users were reluctant
to criticise staff or the service they provide directly. This is potentially apparent
in the analysis of the responses received, where only very occasional negative
comments have been provided. However, care must also be taken not to assume
that this is the case; it may well be that service users are wholly happy with the
day service being offered.
22. It must also be noted that staff’s interpretation of people’s answers could also
skew results. For example, service users were asked if they would be willing to
transfer to a day service in another location. Most respondents answered yes or
no, or gave a reason for their answer (e.g., lack of transport, wanting to stay in
the town, etc.). However, 27 out of the 36 respondents at Gowanlea Day Service
all referenced Gowanlea in their answers (e.g., "I’m happy at Gowanlea," "Not at
the expense of Gowanlea," "I don't see the point in travelling a distance when I
can get the best care here at Gowanlea"). There was a uniformity to these
answers as well, with many people answering this question using the same
phrases.  The Gowanlea responses to some ‘free text’ questions are so different
from those of other units that they stand out.
Feedback
23. The feedback from the service-user survey carried out in December 2024 noted
that when asked to rate the service, over 99% of all service users rated it as a
four- or five-star service (Figure 3).

Page 22

10
FIGURE 3: SERVICE USER RATINGS FOR DAY SERVICES FROM 1 START TO 5 STARS (BEST) (SOURCE: DAY SERVICE
SURVEY, DECEMBER 2024) 
24. When asked to rate the service, the response from service-users was almost
universally positive with only 1 person noting they disagreed with a single
statement (Figure 3).
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Burns
Gowanlea
Stevenston
Thistle
All
5* 4* 3* 2* 1*

Page 23

11
FIGURE 4: SERVICE USER FEEDBACK ON A SERIES OF QUALITY QUESTIONS WHERE RESPONSES WERE MEASURES
ON A 5-POINT SCALE FROM STRONGLY AGREE TO STRONGLY DISAGREE (SOURCE: DAY SERVICE SURVEY, DEC
2024) 
25. When asked if they agreed with a series of questions with a YES/NO/Maybe
answer, service users again responded in an overwhelmingly positive manner
(166 respondents).
FIGURE 5: SERVICE USER FEEDBACK ON A SERIES OF QUALITY QUESTIONS WHERE RESPONSES WERE MEASURED
AGAINST YES/NO ANSWERS (SOURCE: DAY SERVICE SURVEY, DEC 2024) 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90%100%
I am encouraged to move around whilst at the
Day Service
I am treated fairly
I am treated kindly
I am treated with respect
I feel the staff protect me by wearing their PPE
when suitable
I make my own choices with my diet and fluid
If I am unwell, staff can recognise this and help
me get the right help
The staff are aware of the PPE they require to
wear
Strongly Agree Agree Disagree
0% 10% 20% 30% 40% 50% 60% 70% 80% 90%100%
Do you feel the staff support you to meet your
goals and outcomes whilst attending the service?
Is your care provided by staff who understand
and are sensitive to your needs and wishes
When attending the day service do you feel safe
and secure in these surroundings?
Yes Maybe No

Page 24

12
26. Most service users (88%) indicated they did not wish to move to another locality
for Day Service provision, with 1 in 10 willing to attend an alternative location.
The remaining respondents gave vague answers, making it unclear if they would
relocate or not (Figure 6).  However, it's important to interpret these figures
carefully - many responses seemed to show loyalty to the unit they were
attending.  It could be that since respondents had to give their answers directly
to staff in their units, they might have been reluctant to offend or hurt the feelings
of people who provided care to them on a weekly basis.  Furthermore, in the
days following this survey, the service received several phone calls from service
users who were clearly worried that their local service might close.
FIGURE 6: RESPONSES TO THE QUESTION "WOULD YOU BE INTERESTED IN ATTENDING ANOTHER DAY SERVICE
OUTWITH YOUR LOCAL AREA?" (SOURCE: DAY SERVICE SURVEY, DEC 2024) 
27. Most respondents (90%) relied on supplied transport, though this varies slightly
across each location.
No
Unclear
Yes

Page 25

13
FIGURE 7: RESPONSES TO THE QUESTION "DO YOU USE THE DAY SERVICE TRANSPORT?" (SOURCE: DAY SERVICE
SURVEY DEC 2024) 
28. When asked if there was anything they would like to change or improve about
the service, again service-users responded overwhelmingly in the positive, with
only a few suggestions for improvements.
Enhance Meal Variety
29. Several respondents indicated a need for more variety in meals provide, though
none felt there was an issue with food quality.
 Burns Day Service: 5 respondents.  
 Gowanlea Day Service: 3 respondents  
 Stevenson Day Care & Resource Centre: 2 respondents  
 Thistle Day Service: 4 respondents  
30. It is recommended that more varied meal options are introduced to cater to
different dietary preferences. This recommendation applies to all units, with
Burns Day Service and Thistle Day Service having the highest number of
comments.
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Burns DS Gowanlea DS Stevenson DS Thistle DS All
No Yes
TO DO

Page 26

14
Diversify Activities
31. A small number of respondents commented about the activities.  This isn’t a
significant issue for any unit, but it is recommended that an ongoing programme
of new activities are introduced to keep the day service engaging and stimulating
for attendees.  
32. During a self-evaluation away day on 30 April 2024, Senior Day Care Officers
reviewed the main challenges faced by each unit. While they noted that the
programmes of activities were good and the service model was adaptable to the
needs of service users, they also identified several areas of concern including
concerns about the poor quality of referrals being received and staffing
challenges.
Transport
33. Within the current model, each HSCP Day Service unit has two allocated bus
drivers and two buses. However, any issues which arise with buses, and
vacancies, directly impact the transport capacity within each unit. There is also
a general lack of commercial buses available for hire, meaning if the corporate
buses allocated to the Day Service units are being repaired, there is no scope
for alternative transport. Additionally, the allocated buses have a large step into
the bus, which service users can find difficult to manage.  There is also limited
space available, for example, the most recently procured electric bus can only
accommodate two people if two wheelchairs are also required. The seats on the
bus are covered in fabric, which introduces potential continence issues.
34. To scope options to address these issues, the team approached another Local
Authority to ascertain if there was any good practice that could be adopted.  A
review of Day Care transport will be required going forward.
Catering
35. Providing a nutritious meal to service users during their time in day service is
essential for meeting their overall nutritional needs. A review of the catering
within each unit was conducted, focusing on the 3-week rotating meal plan
provided by HSCP Facilities Management.
36. The review found that, during a single 3-week cycle, the majority of meals were
good. Thistle Day Service in Stevenston reported no issues with the food.
However, the remaining units experienced several problems and there is
ongoing engagement with relevant teams to improve catering provision. 
TO DO
TO DO

Page 27

15
Referrals
37. During the April 2024 away-day Senior Day Care Officers also identified poor
quality of referrals.  A review of the forms during the Eclipse process has
addressed this issue.  
Staffing
38. A number of staffing issues were identified; however, the management team
have worked to address these and are monitoring the situation.  
TO DO

Page 28

16
Demand
Attendance
39. Attendance figures (Jan 24 to Feb 25) indicate that in the main, the number of
day care places being offered at each unit is fairly stable, after an increase in
number during the first quarter of 2024 (Figure 8).
FIGURE 8: NUMBER OF DAY CARE PLACES OFFERED JAN 2024 TO FEB 2025 (SOURCE: STATS DAY CARE 29/05/2023
DOCUMENT, EXTRACTED 19 FEB 2025) 
40. Staff who manage the Day Services have indicated that referrals into the service
are becoming increasingly complex, putting pressure on service delivery.  The
risk status of current service users shows that most have been assessed as at
least a ‘substantial’ risk. It is important to note that at time of referral assessment
of risk may be low however this often increases as service users’ conditions
deteriorate.  
0
50
100
150
200
250
300
350
400
01-Jan
08-Jan
15-Jan
29-Jan
12-Feb
26-Feb
11-Mar
25-Mar
08-Apr
22-Apr
06-May
20-May
03-Jun
17-Jun
01-Jul
15-Jul
29-Jul
05-Aug
19-Aug
02-Sep
16-Sep
30-Sep
14-Oct
28-Oct
11-Nov
25-Nov
09-Dec
23-Dec
06-Jan
20-Jan
03-Feb
2024 2025
Alz Scotland Burns DS Gowanlea Stevenson Thistle

Page 29

17
FIGURE 9: CURRENT SERVICE-USERS BY ASSESSED RISK ON 19 FEBRUARY 2025 (SOURCE: DAY SERVICES LIST,
SHAREPOINT) 
41. A high proportion of those attending day-services experience symptoms of
dementia. In 2024, almost 2 in 3 referred to day services experience symptoms
of dementia (Figure 11)
42. Figure 10).  Though, this figure varies by unit with all of those attending Alzheimer
Scotland’s Day Service experiencing symptoms of dementia, compared to
around half of the service users attending Burns Day Service and a third of those
attending Thistle Day Service (Figure 11)
Alz Scot Burns Gowanlea Stevenson Thistle Total#
(blank) 4 57 11 7 11 90
Low 1 1 10 7 2 21
Moderate 3 5 15 28 10 61
Substantial 71 230 132 135 129 697
Critical 14 26 9 4 26 79
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%

Page 30

18
FIGURE 10: SERVICE-USERS WHO EXPERIENCE SYMPTOMS OF DEMENTIA BY REFERRAL DATE (SOURCE: DAY
SERVICES LIST, SHAREPOINT, EXTRACTED 19 FEB 2025) 
FIGURE 11 CURRENT  SERVICE-USERS WHO EXPERIENCE SYMPTOMS OF DEMENTIA BY UNIT (SOURCE: DAY
SERVICES LIST, SHAREPOINT, EXTRACTED 19 FEB 2025) 
43. On 19 February 2025, there were 101 people on the waiting list for a place in
one of the day services units, and a further 53 people are waiting on a second
day of day services (Figure 12). Demand is highest for Burns Day Services.
2023 2024 2025
(blank) 24 12
Yes 238 188 12
No 109 135 12
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
No Yes (blank)
Alz Scot Burns Gowanlea Stevenson Thistle
Yes 29 48 38 36 41
No 44 32 22 19
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%

Page 31

19
FIGURE 12: NUMBER OF PEOPLE CURRENTLY WAITING FOR DAY SERVICES ON 19 FEB 2025 (SOURCE: DAY
SERVICES LIST, SHAREPOINT) 
0
10
20
30
40
50
60
70
80
90
100
Alz Scot Burns Gowanlea Stevenson Thistle

Page 32

20
Options Appraisal
All options were firstly considered against the primary
goal of this project, to achieve the necessary savings. Any
which did not meet this objective were deemed unviable
and not explored further.
Status Quo / Do Nothing
44. The ‘status quo’ option is included as a baseline comparison for other options;
to help understand the relative benefits and risks associated with a proposed
change against the current level of service provision.  
45. NOT RECOMMENDED: Doing nothing is not a viable approach as it will not
achieve the necessary savings. 
Relocate Day Services to Community Hubs 
46. A number of sheltered housing units have community hub spaces included.  In
the past, work has been undertaken to ascertain if relocating day services to
these locations would be viable.  However, there are a significant number of
requirements set out by the Care Inspectorate, which must be met, before such
a move could be made. It has been confirmed that the likelihood of achieving the
required criteria has been discussed with PMI colleagues in the past, and it was
established that none of the hubs met the required specification [6]. 
47. NOT RECOMMENDED: Relocation to community hubs is not a viable option
and has not been considered in any further detail.
Cease Outreach Daycare Provision
48. This option considers placing a permanent pause on recruitment – effectively
opting not to establish an outreach service.  In 2024/25, the Outreach budget
was £165k [4]. Therefore, opting not to introduce an Outreach Service would
realise most, but not all, of the necessary savings from year 2 onwards, therefore,
it this option were chosen, another option would also need to be partly adopted.
Pros Cons
Contribute towards the £200k
saving requirement
Would not achieve 100% of the required saving
requirement. 
A number of people who would meet outreach
criteria would have no service to access, and
therefore demand pressure on other, more costly, 
services would increase.

Page 33

21 
The work already done to develop the Outreach
service for implementation would be abortive. 
People who are unable to attend mainstream Day
Service would be negatively impacted, losing out
on this potential care and support offer.
49. NOT RECOMMENDED: On its own, permanently pausing outreach is not
recommended as it will not achieve all the necessary savings whilst also
increasing demand on other more costly services and negatively impacting
those who cannot attend mainstream day service, introducing an equality
concern.  
Increase Charge for Service
50. At the moment service users currently pay £16.49 for day services, amounting
to £300,118 per annum assuming 100% occupancy.  The income generated by
this recharge is not paid into the day service budget, instead being logged to the
Charges to Users Community Care Service Delivery budget lines.   
51. To achieve the necessary savings using this options alone, the charge would
increase from £16.49 to £27.80 per session, This figure assumes 100%
occupancy and charging may need to be varied to reflect a reduction in
occupancy and account for anyone who is exempt from charging.  It must be
noted that an increase to charges is also being proposed as a separate 2025/26
proposal.  
Pros Cons
Contribute towards the £200k saving
requirement via income generation
To achieve the necessary saving, the cost of
a session would have to increase by at least
c.70% - more when reduced occupancy and
exemptions are factored in. 
It would introduce a potential equalities
issue by presenting a barrier to those who
cannot afford to attend   
The risk of negative publicity when
increasing charges to vulnerable people
during a cost of living crisis. 
If higher recharges resulted in lower
attendance at Day Service, this would mean
increased reliance amongst service-users
for Care at Home and other interventions. 
Many service-users have multiple services
involved in their care and support.  They will
already be impacted by planned increased
via the charging policy.
52. NOT RECOMMENDED: Increasing the charge to c.£28 per session is likely
to introduce a barrier to those on low incomes, and in turn would increase
crisis situations, carer exhaustion and demand on other more costly
services.  [7]

Page 34

22
Three Towns Colocation
53. This option considers co-locating Thistle Day Services and Alzheimer Scotland
in the same location – the Thistle Day Services unit. The unit could accommodate
such a move.
54. It should be noted, however, that if Alzheimer Scotland is expected to provide
the same service, with any contract savings arising from their lack of
accommodation costs – this is unlikely to be achieved.  This is because NAC own
the Alzheimer Scotland building and covers the repair expenses. The rent is
believed to be minimal, if not entirely waived [7]. If Alzheimer Scotland vacate the
building, it will revert back to NAC.
55. Alzheimer Scotland have a staffing compliment as noted, they also have a few
seasonal bank staff [7]: 
 1 x Practice Team Leader 
 2 Day Care Organisers (21hrs) 
 3 Day Care Support Workers (28hrs) 
 1 Day Care Support Worker (21hrs) 
Pros Cons
Potential saving to contract but unknown
how much benefit would be achieved.
Unlikely to achieve the necessary level of
savings required
Service users would still have access to
services in the same vicinity as
previously.
It is unlikely to be viable due to the layout of
the unit that two separate services could be
co-located and continue to operate
independently.  There is only one dining
room, lounge etc, meaning both services
would be seeking to use these at the same
time.  Furthermore, Alzheimer Scotland
have their own policy and procedures and
employment conditions that would differ
from those used by HSCP.   
No job losses  Alzheimer Scotland may not want to
relocate 
Alzheimer Scotland employ different policies
and procedures to HSCP and this may
hinder service delivery 
The change of environment for service-
users with a memory impairment could have
a negative impact on their well-being. 
A number of people who would meet
outreach criteria would have no service to
access, and therefore demand pressure on
other, more costly,  services would increase
(most significantly Day Services ) 
The work already done to develop the
Outreach service for implementation would
be abortive. 
People who are unable to attend
mainstream Day Service would be

Page 35

23
negatively impacted, losing out on this
potential care and support offer.
56. NOT RECOMMENDED: This option is unlikely to be viable.  The layout of the
unit means it would not be possible to run two separate services in this
location, both functioning at the same time (ie. both sharing the same
lounge, dining room etc), using different policies and procedures.
Permanently Close Thistle Day Service
57. This option would see the current service, located in Stevenston, close.  The
rationale being the proximity of Alzheimer Scotland who are also based in the
Three Towns locality (Ardrossan).  NB: Alzheimer Scotland only service people
with memory impairment and only have 9 spaces per day available. They could
not compensate for the resulting shortfall of spaces in the Three Towns, with
further detriment incurred by people living in the Three Towns who do not have
a memory impairment as there would be no delivery of this provision within the
Three Towns locality.
58. Whilst Thistle Day service has capacity for 24 spaces per day (120 spaces per
week) these spaces are currently not filled due to current staffing levels
implemented following previous budget savings. Instead, it would result in a loss
of 70 day service sessions a week. 
59. There is currently a £235K budget allocated for Thistle Day Service, however,
the loss of income secured via recharging (at 100% occupancy) would reduce
the saving by £60k based on 2024/25 charging rates.  Therefore, at 100%
occupancy, closing Thistle Day Service would achieve a saving of around £175k.  
Pros Cons
Contribute towards the £200k saving
requirement
Closing Thistle Day Service would not
achieve 100% of the savings requirement
and other options would also need to be
partly adopted.   
There would be no place for frail elderly
service users in the Three Towns
introducing an equality issue (based on
postcode). 
Job losses for staff could be politically
sensitive and result in negative publicity 
Negative publicity resulting from the closure
of a second day service in the Three Towns.
(previously closed Castleview). 
The current case load of service-users
attending day services includes people who
have attended for many years and realise
significant benefit.  The impact of removing
the service from them is likely to also be
significant (eg social interactions, nutrition,
monitoring of situation etc).

Page 36

24 
Service-users in the Three Towns are
unlikely to want to travel to a unit in another
locality. 
Loss of this service would increase crisis
situations, carer exhaustion and possibility of
more demand on more costly services.  
60. FOR SMT CONSIDERATION: The cons significantly outweigh the benefits in
this option and introduce risk of negative publicity, increased demand on
other more expensive services, increased social isolation for service-users
and inequality in access services for those living in the Three Towns.
Discontinue Alzheimer Scotland Daycare Provision
61. This option looks at discontinuing the Alzheimer Scotland daycare provision
contract at the point of renewal and transferring those service users into
alternative HSCP’s Day Service units.  Service users moving from Alzheimer
Scotland would pay their Day Service charge to HSCP, resulting in an additional
c.£54k via income from recharges .
62. Alzheimer Scotland provide services to people with a memory impairment. Our
contract with the organisation provides 9 spaces each day of the week (63
spaces overall).  The intention is that the contract ensures service provision for
individuals across North Ayrshire, however restrictions in this regard are
imposed by the organisation.  
63. The current contract with Alzheimer Scotland runs to end 28 February 2025 with
an annual value for 2024/25 of £241,471. There is a further 6-month extension
option that would extend the contract to 31 August 2025; the value of which
would require to be confirmed through the fee uplift process in 2025, but for
planning purposes can be assumed to be around 50% of the 2024/25 cost (ie.
C.£121k). PSMT have agreed to this contract extension.
64. It should also be noted that Alzheimer Scotland often decline to accept people
who live within North Ayrshire, but beyond the area they deem viable in terms of
transport (most recently in January 2025 a service user living in Springside).  
65. There would be an impact on all Day Service units, as Alzheimer Scotland has a
client group from across North Ayrshire, and these individuals would be eligible
for continued service delivery in one of the HSCP units.  Thistle Day Service is
currently under capacity due to staffing, if they absorbed the displaced service-
users, there would be a cost to HSCP that should be factored in. The cost of one
Day Care Officer is £31,514, based on 2024/25 costs [4].   Additional transport
costs should also be considered to support this option.
Pros Cons
Would fully achieve the £200k saving
requirement from year 3
If this contract ceases, consideration must
be given to increasing Thistle Day Services

Page 37

25
capacity to mitigate the shortfall in care
provision that would result.  This would
mean additional staffing allocated to Thistle
Day Services, increasing the cost of that
service. 
There is capacity in Thistle Day Services
to absorb the service gap that would
result.
The change of environment for service-
users with a memory impairment could have
a negative impact on their well-being.
More income would be generated for
HSCP from the recharge to service-users
who would transfer into the HSCP Day
Service  (c.£54k per annum at current
rates and 100% occupancy)
There is a risk of negative social media  fall
out  (reputational, political etc). 
Loss of a nationally recognised specialist
service operating in North Ayrshire – for
people with dementia 
Potential for job losses (could this be
mitigated by offering employment in HSCP
Day Services) 
The loss of weekend provision 
There is no guarantee that the displaced
service-users would be able to secure an
alternative place in their own locality
(current lack of capacity)  so additional
transport costs may be incurred 
Service users, who currently enjoy
Alzheimer Scotland service during a
Saturday or Sunday would be required to
change their attendance day to between
Mon-Friday 
Does not achieve all necessary savings in
year 2 due to the contract extension
66. FOR SMT CONSIDERATION: Moving forward, this option would achieve the
necessary savings with minimal impact on overall service provision. Whilst
the cons significantly outweigh the benefits of this option, many could be
managed by increasing HSCP spaces to offset the loss of Alzheimer
Scotland and seeking to employ staff faced with redundancy in HSCP
services. The team could also consider ways of familiarising displaced
service users with the HSCP unit they would move to. Nonetheless,
adopting this option could send a message to the people of North Ayrshire,
that employing the services of a nationally recognised Dementia provider
is not necessary.  Regardless, as PSMT have agreed to a contract extension
of six months, it is further recommended that should this option be
considered most suitable, that in Year 2 it is supplemented by another cost-
saving measure.[7]

Page 38

26
Redesign Partnership & Alzheimer Scotland Service-
Delivery Roles
67. A final option could be to review and change the specification of services being
delivered by Alzheimer Scotland in North Ayrshire. The Partnership would no
longer procure external Day Services or introduce an Outreach service. 
Instead all Older People Day Care services will be provided by in-house
services with the remit of Alzheimer Scotland changing to a model which would
include Befriending, Dementia Daycare Outreach at Home services and
increased provision of services to support carers of loved ones living with
dementia.  This service specification change would enable a reduction in
current spend to Alzheimer Scotland, as the service will see reduced
expenditure in building costs, transport, and meal provision.  This budget
saving would be used to increase staffing levels within NAHSCP day services
ensuring capacity for transferring Alzheimer Scotland service users and further
potential increase in capacity from waiting lists.
68. The loss of Outreach would achieve over £100k per annum in savings, and
when it is time to renew the Alzheimer Scotland contract, HSCP would offer a
fixed price contract (set at a level within budget parameters) to seek a provider
that could offer a more mobile service to both service users and their
families/carers – effectively widening the scope of support that is available in
the area to everyone affected by Dementia, and offsetting the impact of losing
Outreach Support. 
69. However, if this is deemed a viable and desirable option, a move should be
taken immediately to ensure the accommodation of displaced service users
resulting from changing the Alzheimer Scotland model.  Work would also have
to commence to familiarise those service users who would be displaced with
the alternative units in their locality (ie. the HSCP run unit).  This would also
require a more significant adjustment for the service users who currently
access Alzheimer Scotland at the weekend, as not only would the location but
also the day of the week change for them.
Pros Cons
Would ensure the necessary budget
savings are achieved.
Alzheimer Scotland may not want to bid for
a detailed and specific model of service
delivery or deem it undeliverable within the
budget parameters set.
Service users would still have access to
specialist service and day services
There would be a loss of service delivery for
up to 63 service users per week – who
already enjoy day services with Alzheimer
Scotland, including the loss of weekend
provision.  (It should be noted that a number
of these service users already also attend an
in-house Day service.

Page 39

27
No job losses  The change of environment for service-
users with a memory impairment could have
a negative impact on their well-being.
HSCP would avoid negative publicity
around budget cuts 
The waiting list for  HSCP run Day Services
would continue to increase  until 63 new
spaces were available within the existing
HSCP run units.  This will be minimised by
the increase in staffing within specific units.
More support for those close to people
with Dementia (eg. family, carers) in the
area. 
A new service model which would include
Befriending and Dementia Outreach Day
services delivered via Alzheimer Scotland
could offset the impact of losing a
Partnership Outreach Service whilst also
ensuring the specialist knowledge and
skills held by Alzheimer Scotland are
being optimally used. 
70. FOR SMT CONSIDERATION: This is the only options where the ‘pros’
outweigh the ‘cons’.  Moving forward, this option would achieve the
necessary savings and, if managed effectively limit the impact on the
displaced service users.  It also allows the HSCP to offer a wider service to
the families of people with Dementia, mitigating the loss of Outreach
Support.  It would offer a solution to those people who cannot access Day
Services and who would have otherwise been suitable for Outreach.

Page 40

28
Appendices
Charter of Rights 
SOURCE: NORTH AYRSHIRE COUNCIL: SOCIAL SERVICES POLICIES AND PROCEDURES, DAY SERVICES, JUNE 2005.
 The right to be treated with dignity at all times and to be treated as an individual,
whatever disabilities and frailties one may have.
 The right to pursue independence, responsibilities, and choice where they do
not infringe the rights of others.
 The right to privacy in relation to one’s own space, one’s own belongings, one’s
own financial and personal affairs.
 The right to have one’s cultural and religious needs accepted and respected. 
 The right to have one’s physical, sexual, and emotional needs accepted and
respected.
 The right to care for oneself as far as possible and have appropriate assistance
if required.
 The right to be informed of new procedures and have these made explicit, the
right to comment and have one’s expressed opinions heard and listened to.
 The right to mix with other people in the community, either by going out or by
inviting others into the residential home.
 The right to have assistance where necessary and practicable to access facilities
available within the wider community, medical, social, educational, leisure and
other services.
 The right to establish a service user’s group and freely nominate a representative
to serve on such a group.
 The right to have free and clear access to the complaint’s procedure.
 The right to confidentiality in relation to medical and personal information, access
to information on file and to know on what basis information is shared with others.
 The right to have a personal advocate (representative) to safeguard one’s
interests if required.
 The right to take appropriate risks in relation to the exercising of one’s rights.

Page 41

29
Day Service Space Requirements
SOURCE: KERRY RENNIE, TEAM MANAGER OLDER PEOPLE SERVICES/CARE AT HOME)
Q1. The building and grounds are designed to comply with all relevant legislation and guidance
documents. Certificates and commissioning documents with regard to engineering services and
plant, approval letters and letters certifying completion of works and arrangements from other
agencies and authorities confirm this. 
Q2. There are suitable car parking arrangements for service users, visitors, and staff. 
Q3. There is clear access to and egress from the setting for emergency and other vehicles, and
there are suitably sized turning spaces for service vehicles using the site. 
Q4. There are areas for service users to get on and off transport safely that are illuminated and
offer some protection against the elements. 
Q5. Where the day care setting’s programme includes outdoor therapeutic and leisure
opportunities, the space is accessible to all service users. In settings registered to provide services
to people with dementia, there is a secure perimeter. 
Q6. Front entrance doors are semi-automatic as a minimum and in facilities where people need
assistance with walking or use wheelchairs, consideration should be given to having doors in
activity areas fitted with hold open devices or that are free to swing and linked to the fire alarm. 
Q7. The doorways in activity areas used by service users have a clear opening width of at least
800mm, but in settings where service users need assistance when walking or use wheelchairs,
wider doorways are recommended. Corridor doors have vision panels and in day care settings
where service users need assistance when walking or using wheelchairs, there are level access
thresholds at all doors. 
Q8. The minimum corridor width is 1.2m unobstructed between handrails, but in day care settings
where service users need assistance when walking or use wheelchairs a minimum width of
between 1.5m and 1.8m is recommended. 
Q9. All activity areas are accessible to service users through the provision, where necessary, of
ramps, lifts (large enough to accommodate a stretcher), other facilities and signage. 
Q10. According to the service user groups offered services in the day care setting, there are
suitably positioned hand and grab rails, hoists, communication aids and other equipment,
including assistive technology, which meet the general needs of the service user group and
promote independence in all the areas accessed or used by service users. 
Q11. According to the service user groups offered services in the setting, service user/staff call
points, accessible to service users are provided in areas where service users are likely to be alone,
toilets and washrooms. These are linked to a system that alerts staff a call is being made or
assistance is required. 
Q12. There is both natural and good quality artificial lighting in all areas suitable for the needs of
service users and any activities organised in each room. The artificial lighting in areas used by
service users is sufficiently bright and positioned to facilitate activities. The recommended lighting
level in toilets is between 100 – 200 lux. 
Q13. All activity areas used by service users are naturally ventilated, have opening windows with
safety glazing and guarding where necessary. Window openings are controlled to a safe point of
opening of no more than 100mm and cannot be overridden by 
service users. Frosted or obscured glass is fitted as required to ensure privacy.  
Q14. The heating system can be controlled within safe limits for the service users’ comfort in
areas accessed and used by them and is able to provide a range of temperatures throughout the
setting. 
Q15. Furniture and fittings are suitably designed for the activities that take place in the room and
incorporate ergonomic design principles that promote user independence and safe handling.

Page 42

30
They, and any equipment or mobility aids, are positioned to take into account the mobility and
overall needs of the service users, including those with sensory impairments. 
Q16. Floor coverings and wall finishes are suitable for the purpose of each room and meet health
and safety and infection control requirements. Finishes that produce glare, dazzle and optical
illusions are avoided, and where service users use wheelchairs  floor coverings have non-
directional pull. According to the service user groups offered services in the day care setting, for
example those with a visual impairment, changes in the texture of floor coverings or other
indicators should be considered to identify key areas in the setting, for example doorways or the
top or bottom of stairs. Space for activities 
Q17. The minimum space per service user (excluding corridors and circulation areas) is 4.5m² in
general activity areas, except for computer suites where 3.0m² is adequate. Where service users
have high dependency needs, a minimum space of 7.5 m² is recommended. 
Q18. Having a range of size of rooms provides flexibility for organising activities and where the
varied needs of service users can be met. According to the service user groups offered services in
day care setting, this can include: 
• A room where meetings can take place. 
• A facility for service users to make or get drinks and snacks. 
• A quiet room with something suitable to rest on; and 
• A room where telephone calls can be made or received in private. 
Q19. The design of the dining space takes into consideration the number of service users who can
eat comfortably together at one time. The space required for dining is at least 1.5 m² per person,
but where service users have high dependency needs the space will be greater. Toilet and
washing facilities.
Q20. There are separate toilets for ambulant males and females, at least one wheelchair
accessible unisex toilet that complies with the Building Regulations and a toilet facility identified
for visitors. 
Q21. Each toilet facility: 
• is clearly marked and conveniently located to rooms used by service users. 
• is fully and separately enclosed. 
• has suitable hand washing and drying facilities to meet infection control guidelines; and 
• has a door that opens outwards. 
Toilets for ambulant, semi and assisted ambulant people are a minimum of 3m². 
Toilets for people who use a wheelchair independently or require the assistance of one person
are a minimum of 4.5m² and at least 2m long. 
Toilets for people who use a wheelchair and require the assistance of two people are a minimum
of 5.5m² and at least 2m long. 
Q22. Where the day care setting provides personal care there is an adequate number of bath and
shower facilities. Bathrooms for ambulant people, people who require assistance and people who
use a wheelchair independently are a minimum of 8.5m². 
Bathrooms for people who require the use of a hoist are a minimum of 16m². Shower rooms are
7m² (non-linear layout) or 7.5m² (linear layout) and are level access. 
Q23. Locks and handles on toilets, bathroom and shower room doors are easy to operate and
allow staff immediate access in an emergency.
Medicines
Q24. There is an identified area where medicines can be stored, in accordance with the
manufacturers’ instructions. This has:

Page 43

31
• cupboards conforming to British Standards for the storage of medicines. 
• space to safely store, access, and administer medicines and medicinal products. 
• sufficient work surfaces for the tasks required; and 
• hand washing facilities in close proximity that meet infection prevention and control guidelines.

Page 44

32
References 
[1]  D. C. L.-W. M. Lunt C, “The role of day care in supporting older people living with long-
term conditions,” December 2018. [Online]. Available:
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6221434/. [Accessed June 2024].
[2]  The Dunhill Medical Trust, Social Care Workforce Research Unit, Institute of Gerontoloty,
King's College London, “Evidence briefing for commissioners: day centres for older
people,” February 2018. [Online]. Available: https://www.ageuk.org.uk/bp-
assets/globalassets/gwyneddamon/keep-well-keep-warm/day_centres_for_op--
evidence_briefing__for_commissioners.pdf. [Accessed June 2024].
[3]  M. J. T. A. Orellana K, “Day centres for older people: a systematically conducted scoping
review of literature about their benefits, purposes and how they are perceived.,” April
2020. [Online]. Available: https://www.cambridge.org/core/journals/ageing-and-
society/article/day-centres-for-older-people-a-systematically-conducted-scoping-review-of-
literature-about-their-benefits-purposes-and-how-they-are-
perceived/8469C5AB75F8540BE4617E6B11E753C1. [Accessed June 2024].
[4]  A. Braton, Interviewee, Snr Accountant. [Interview]. Nov 2024.
[5]  North Ayrshire Council, “Social Services Policies and Procedures, Day Services,” North
Ayrshire Council, Irvine, 2005.
[6]  J. Davies, Interviewee, Principal Manager, Business Support. [Interview]. 30 July 2024.
[7]  K. Rennie, Interviewee, Team Manager. [Interview]. Nov 2024.
[8]  R. Bently, Interviewee, Snr Maanger, Arran Services. [Interview]. 2024.