Integration Joint Board
30 April 2026
Subject : Ayrshire Transformation Board 
Purpose : The purpose of this report is to seek North Ayrshire Integration
Joint Board (IJB) endorsement of participation in the Ayrshire
Transformation Board (ATB), established to strengthen integrated
working across North, East and South Ayrshire Councils, the three
Integration Joint Boards and NHS Ayrshire and Arran. 
Recommendation : The Integration Joint Board is asked to:
• Endorse the establishment of the Ayrshire Transformation
boar (ATB) as the formal senior officer structure for
strengthening integrated working across East, North and
South Ayrshire Councils, the three Integration Joint Boards
and NHS Ayrshire and Arran.
• Notes the agreed governance arrangements, including the
ATB’s remit, membership, reporting structures, and its
alignment with existing local and national oversight
frameworks;
• Approves the initial programme areas identified for system
wide redesign;
• Approves the Terms of Reference as set out in Appendix 1,
and,
• Note the content of the report. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
ATB Ayrshire Transformation Board 
1. EXECUTIVE SUMMARY 
1.1 The Ayrshire Transformation Board has been established by senior partners across
Ayrshire to respond collectively to increasing financial, operational and performance
pressures across health and social care.

Page 2

1.2  The ATB provides a senior officer forum to oversee whole-system transformation,
support improved flow, reduce variation and duplication, and progress shared
priorities under a “Once-for-Ayrshire” approach. 
1.3  The ATB does not replace existing statutory or local governance arrangements.
Accountability for delivery, performance and financial control remains with each
partner organisation, including North Ayrshire IJB. 
1.4 Each Council, Integration Joint board (IJB) and the NHS Board will confirm its own
internal governance and reporting structure to ensure appropriate grip, control and
delivery against agreed priorities.   
2. BACKGROUND 
2.1 In February 2026, senior representatives from the three Ayrshire Councils, the three
Integration Joint Boards and NHS Ayrshire and Arran met and agreed that further
collective action was required to respond to escalating financial, operational and
performance pressures across the system. 
2.2 In order to deliver this, it is proposed to establish an Ayrshire Transformation Board to
support the identification, investigation and recommendations for optimised
performance, financial efficiencies and integration opportunities across the whole
system in line with the ‘Once for Ayrshire’ ideology. 
2.3 Integrated working and associated structures have been in place for over twelve
years, beginning with the 2014 shadow year of IJBs and moving to full integration from
1 April 2015. These arrangements have served us well, including throughout the
significant pressures of the COVID-19 pandemic.  However, the scale and complexity
of current challenges – including increasing demand, delayed discharge, Adults with
Incapacity (AWI) delays and significant financial constraints – require enhanced
system-level coordination.   
2.4 Resources across health and social care are increasingly focused on critical need,
limiting capacity for prevention and early intervention and placing further pressure on
acute and community services.   Over the past few years evidence demonstrates it is
becoming increasingly difficult to manage financial and performance governance
effectively across our current structures. All three Councils, Integration Joint Boards
and NHS Ayrshire & Arran are operating within extremely challenging financial
circumstances, and both community and acute services are experiencing growing
waiting lists for assessment and treatment. 
2.5 In communities, health and social care resources are increasingly being focused on
critical need to provide essential personal care. Whilst this care is appropriate the
increased utilisation of resources leaves a gap to fund preventative supports and early
intervention that can improve the health and social circumstances of individuals and
communities, and in so doing reduce demand on more acute services.

Page 3

2.6 Given these pressures, we believe it is essential for Ayrshire to take greater collective
control and to work more closely and consistently than we have before. To support
this, we are proposing the following revised arrangements to strengthen integrated
working and improve our shared oversight and decision-making. 
The Ayrshire Transformation Board has been established to provide a structured
mechanism to address these challenges collaboratively, without altering statutory
responsibilities of the different organisations. 
ATB Structure and Programme Priorities 
2.7 The diagram below shows the multi-layered governance and operational structure
designed to oversee whole system transformation across health, social care and local
authority partners within Ayrshire through the ATB. 
2.8 The arrangement demonstrates clear hierarchy, flowing from the Ayrshire Executive
Group through the ATB, and into the operational leadership provided by four Chief
Executives, four Chief Officers, medical, nursing and social work leadership, and
financial/digital professionals.   This structure is intended to support whole system
decision making, improve accountability, and co-ordinate transformation efforts
across organisational boundaries.

Page 4

2.9 At the core of the initial model are five major programmes: Shared Services/Lead
Agency work, Right Care Right Place, Adults with Incapacity (AWI), Digital
Transformation, and Communications. Together, these programmes reflect the major
areas of system pressure and opportunity identified across the region. 
Shared Services and Lead Agency Approaches 
The shared-services programme explores opportunities for joint working across local
authorities, IJB and health services. The emphasis is on what can already be achieved
within existing terms and conditions, acknowledging that workforce policies may
constrain progress but should not inhibit innovative proposals such as single
management or single health and social care models. This strand reflects national
trends in integration and aims to improve efficiency and reduce duplication. 
Right care, right place
The programme focuses on ensuring hospitals operate at optimal occupancy levels by
improving flow, reducing delays, and shifting activity from acute settings into
community-based care. The programme highlights the need for coordinated planning
around bed numbers, delayed transfers of care, patient flow, commissioning, and the
business case implications of releasing resources from acute to community settings.
This aligns with ongoing national priorities around unscheduled care performance and
demand management. 
Adults with Incapacity (AWI) 
Ayrshire is shown as a persistent outlier in the number and duration of transfers from
hospital for people with complex care needs including AWI-related delays. The
programme aims to address both the time required to progress each step of the AWI
process and the underlying legislative constraints. The diagram signals options for
further scrutiny of the experience of individuals and families and the potential to
enhance clinical and multidisciplinary decision-making to improve patient journeys.
The issue remains a significant contributor to delayed discharge pressure, and thus a
priority for system transformation. 
Digital Transformation 
Digital remains a key enabler, with the diagram identifying data systems, shared
platforms, and single patient or care records as areas where significant progress is
still required. While national developments will support transformation, the regional
opportunity lies in accelerating local integration, improving analytics capability, and
modernising infrastructure to support both operational efficiency and clinical quality.

Page 5

Communications 
The final programme addresses the need for clearer and more coordinated
communication across all partner organisations. Financial pressures, complex
decision-making, and high levels of public and political scrutiny require improved
messaging that enables shared understanding. This will be particularly critical as
consultation exercises and community engagement around transformation
programmes become more extensive. 
2.10 The Terms of Reference (TOR) for the ATB are attached at Appendix 1.   These
provide clarity on purpose, scope, membership and reporting arrangements.   
Governance Structures 
2.11 The governance structure outlines how assurance, performance, and transformation
activity is overseen across NHS Ayrshire & Arran and its partners. The Scottish
Government Assurance Board links directly with the NHS Ayrshire & Arran Board,
which holds responsibility for organisational performance and oversight. The Board is
supported by the Performance Governance Committee, ensuring scrutiny of delivery
and risk. 
2.12 The Ayrshire Transformation Board connects the NHS structures with wider system
partners including North Ayrshire Council and strengthens shared accountability
between the Integration Joint Boards, Local Authorities, and the Health Board,
emphasising the collaborative governance required for integrated service delivery
across Ayrshire. 
2.13 The Board will: 
• Enhance productivity and value for money through greater collaboration and
integration 
• Ensure resources are directed as effectively and efficiently as possible towards
improving resident’s care, safety and health outcomes 
• Identify redesign and transformation opportunities that will further improve
services for the communities we serve 
• To consider the implications of national decisions through the new regional
sub-planning arrangements for the East & West of Scotland for health services
and the 3 Integration Joint Boards and NHS Ayrshire and Arran and any
subsequent implications for Council services outwith delegated functions to
IJBs. 
The Board provides a leadership forum to identify and support the development and
review of system-wide efficiency opportunities that focus on collaborative working and
transformation/redesign to improve how services are delivered that reduce cost and
improve outcomes for the whole Ayrshire Health and Care system.

Page 6

Each involved organisation will retain responsibility for their own strategic objectives
and programmes of work aligned to their local delivery plans. 
3. PROPOSALS 
3.1 North Ayrshire IJB is asked to: 
• Endorse participation in the Ayrshire Transformation Board as a system-level
transformation and coordination mechanism.
• Note the agreed governance arrangements, Terms of Reference and reporting
routes.
• Support the initial identified programme areas, which are : 
• Shared services and lead agency approaches
• Right Care, Right Place (flow and unscheduled care)
• Adults with Incapacity (AWI) pathways
• Digital transformation
• Communications and engagement 
The ATB will make recommendations to partner organisations; any decisions requiring
formal approval will continue to be progressed through existing North Ayrshire IJB
governance routes. 
3.2 Anticipated Outcomes 
Anticipated benefits of participation include:
• Improved system-wide planning and decision-making.
• Reduced variation in service delivery across Ayrshire.
• Improved flow through acute and community settings.
• More timely and consistent AWI processes.
• Enhanced use of shared digital infrastructure and data.
• Clearer and more consistent communication with staff, partners and communities. 
3.3 Measuring Impact 
Impact will be monitored through: 
• Programme-specific delivery plans and milestones.
• Existing IJB performance and assurance frameworks.
• Regular reporting through agreed ATB governance routes.
• Use of quantitative and qualitative measures, including flow metrics, delayed
discharge data and financial performance. 
North Ayrshire IJB will retain responsibility for evidencing impact and performance
within its statutory and local governance arrangements.

Page 7

4. IMPLICATIONS 
4.1 Financial
Participation in system-level transformation activity may require targeted investment,
particularly in digital infrastructure and service redesign.  There is an expectation that
the programme will support improved productivity, reduced duplication and better
value for money over time. Any financial commitments arising will be subject to North
Ayrshire IJB approval processes and existing schemes of delegation. 
4.2 Human Resources
Transformation programmes may impact workforce roles, models of working and
capacity.  Potential benefits include improved workflows, reduced duplication and
better use of skills. Risks include workforce pressure during transition and change
fatigue. These will be managed through existing HR policies, workforce planning and
staff engagement arrangements. 
4.3 Legal
The Ayrshire Transformation Board operates within existing statutory frameworks,
including the Public Bodies (Joint Working) (Scotland) Act 2014.   The Board has no
delegated authority to make statutory decisions on behalf of North Ayrshire IJB.   Legal
accountability remains with individual partner organisations. 
4.4 Equality/Socio-Economic
Initial Quality Impact Assessments have been undertaken at programme level. Full
Equality Impact Assessments will be completed where proposals are sufficiently
developed and where potential impacts on protected characteristics or
socio-economic disadvantage are identified. 
This approach supports the Public Sector Equality Duty and the Fairer Scotland Duty. 
4.5 Risk
Key risks include:
• Inconsistent implementation across partner organisations.
• Service disruption during transformation.
• Workforce capacity and wellbeing impacts.
• Financial sustainability risks. 
Risks will be managed through programme-level risk registers, established assurance
routes, and appropriate escalation arrangements. 
4.6 Community Wealth Building 
There are no direct Community Wealth Building (CWB) implications arising from this
report. However, governance arrangements should ensure that the CWB principles of
local procurement, workforce wellbeing, and community empowerment are
considered as part of transformation activity.

Page 8

4.7 Key Priorities
None. 
5. CONSULTATION 
Senior officers from North Ayrshire Council, North Ayrshire IJB and NHS Ayrshire and
Arran have been involved in the development of the proposals.  Ongoing engagement
with staff, partners, communities and service users will be progressed through the
Communications programme and formal consultation will be undertaken where
required. 
Caroline Cameron, Director 
Appendices
• Appendix 1 – Terms of Reference Ayrshire Transformation Board

Page 9

Ayrshire Transformation Board 
Terms of Reference v 01.0 
Date Commentary Owner
13/02/26 First Draft of new Terms of Reference v0.1 GJ
20/02/26 Second Draft comments v 0.02 GJ
24/02/2026 Third Draft comments v 0.03 GJ
16/03/2026 Final version Terms of Reference v 01.0 EF

Page 10

1.0 Constitution and Purpose
1.1 The Ayrshire Transformation Board is being developed in full collaboration with its
system partners of East Ayrshire Council, North Ayrshire Council, South Ayrshire
Council, NHS Ayrshire and Arran, North Ayrshire Integration Joint Board, East Ayrshire
Integration Joint Board and South Ayrshire Integration Join Board. 
1.2 The purpose of the Ayrshire Transformation Board is to support the identification,
investigation and recommendations for financial efficiencies and integration
opportunities across the whole-system in line with the ‘Once-for-Ayrshire’ ideology. 
1.3 The Board has been established to:
• Enhance productivity and value for money through greater collaboration and
integration
• Ensure resources are directed as effectively and efficiently as possible towards
improving resident’s care, safety and health outcomes
• Identify redesign and transformation opportunities that will further improve services
for the communities we serve
• To consider the implications of national decisions through the new regional sub-
planning arrangements for the East & West of Scotland for health services and the 3
Integration Joint Boards and NHS Ayrshire and Arran and any subsequent
implications for Council services outwith delegated functions to IJBs. 
1.4 The Terms of Reference will be reviewed and endorsed by each partner organisations
reflecting a shared approach to collective responsibility, collaborative decision-making
and a commitment to joint-success and risk-sharing approaches. 
1.5 Each involved organisation will retain responsibility for their own strategic objectives and
programmes of work aligned to their local delivery plans. 
2.0 Authority
2.1 The Ayrshire Transformation Board is authorised by the Boards/Councils of its
member organisations to:
• Investigate any activity within the remit of the terms of reference. 
• Develop the strategic objectives and define the programme of collaborative work to
be undertaken to deliver success  
• Create task-and-finish sub-groups to take forward specific programmes of work as
agreed by the Board’s members; and to determine the membership and approve
the terms of reference for those sub-groups. 
• Make recommendations to or escalate issues to member Boards/Councils where
they fall outside the remit of this Board. 
• While not anticipated, and for the avoidance of doubt, any financial investment to
support work will be subject to each organisations scheme of delegation and
standing financial instructions. 
3.0 Roles and Remit
3.1 Provide a leadership forum to identify and support the development and review of
system-wide efficiency opportunities that focus on collaborative working and
transformation/redesign to improve how services are delivered that reduce cost and
improve outcomes for the whole Ayrshire Health and Care system.

Page 11

3.2 Agree a programme of work, ratified by each organisation, that the Board will be
responsible for monitoring, evaluating and evidencing for the benefit of residents, staff
and the future financial sustainability of the whole health system. 
3.3 To collaboratively review financial strategies, transformation / redesign and
improvement activities and plans to deliver quantifiable operational and financial
benefits and value for money. 
3.4 Connect with and ensure alignment of at-scale programmes being progressed with one
member organisation are considered for wider collaboration across multiple members,
where appropriate. 
3.5 Produce and manage the programme of collaborative work across the Board, monitoring
actions, challenges and risks and provide assurance to each respective Board on
progress. 
3.6 Receive updates on progress from sub-groups established by this Board at a frequency
to be determined. 
3.7 Evaluate the impact of each programme of work on each partner organisation and be
assured the intended outcomes sufficiently aligns with the strategic objectives  and that
any untoward or unintended consequences have been appropriately considered and
mitigated. 
3.8 Identification of the cultural enablers for collaboration within the Board and across
system partners and seek assurance that enablers are in place, and where gaps exist
that action is taken. 
3.9 Utilise improvement and transformation approaches across programmes of work that
foster an environment that engages and involves staff in shaping the direction of the
workstream. 
3.10 Support and champion a culture of improvement across the Ayrshire system that
fosters a willingness to actively pursue benefits for our residents and employers and
partners. 
3.11 Ensure compliance with information governance and data security regulation, where
data-sharing is needed. 
3.12 Manage strategic communications and engagement across the Board and externally
in relation to key programmes of work; where appropriate. 
3.13 Confirm that all programmes of work are underpinned and informed by
communications and engagement with key stakeholders, including the local population
where required. 
3.14 Ensure there is a consistent focus on and prioritisation of reducing cost whilst reducing
health inequalities and improving clinical outcomes. 
3.15 The structure and initial areas of focus are noted in appendix 1.

Page 12

4.0 Membership
4.1 The Ayrshire Transformation Board shall be comprised of:
Name Title Organisation
Eddie Fraser Chief Executive Officer (Chair)  East Ayrshire Council
Craig Hatton Chief Executive Officer  North Ayrshire Council
Stephen Penman Chief Executive Officer South Ayrshire Council
Gordon James Chief Executive Officer  NHS Ayrshire and Arran
Crawford McGuffie Medical Director NHS Ayrshire and Arran
Jenny Wilson  Director of Nursing NHS Ayrshire and Arran
Vicki Campbell Director of Acute NHS Ayrshire and Arran
David Stonehouse Interim Director Finance  NHS Ayrshire and Arran
Craig McArthur Chief Officer East Ayrshire IJB
Joseph McLachlan Director of Finance and Digital East Ayrshire Council
Marion MacAulay Chief Social Work Officer East Ayrshire
Council/East Ayrshire IJB
Mark Boyd Head of Finance North Ayrshire Council
Caroline Cameron Chief Officer North Ayrshire IJB
Scott Hunter Chief Social Work Officer North Ayrshire Council/
North Ayrshire IJB
Mark Inglis Chief Officer South Ayrshire IJB
Tim Baulk Chief Financial Officer South Ayrshire Council
Jackie Hamilton Chief Social Work Officer South Ayrshire Council/
South Ayrshire IJB 
4.2 Non-members will be invited to attend to present or speak to specific agenda items. The
Chair will be notified of these individuals in advance so they can be properly introduced. 
4.3 The Meetings will be chaired by the Chief Executive Officer of East Ayrshire who is also
a core member of the Board. 
4.4 The Chair will be responsible for agreeing the agenda and ensuring matters discussed
meet the objectives as set out in these Terms of Reference. 
4.5 Members should make every effort to attend each meeting given its significance to long-
term financial sustainability. 
5.0 Meeting Frequency, Quorum and Administration
5.1 The Board will meet bi-monthly at a day and time each month that is convenient to all
members. Scheduled dates for the next twelve months will be set out in Appendix 1. 
5.2  Whilst the anticipated norm will be in-person meetings, the meetings will also be offered
as hybrid. 
5.3 Quoracy will be reached when the following conditions are met:
• The Chair is present
• A minimum of one representative from four member organisations, including one
from NHS and one from each Council 
5.4 If a meeting is not quorate then the meeting may proceed if those in attendance agree,
with any decisions taken subject to offline or next meet approval by members not in
attendance.

Page 13

5.5 The Board shall be supported by an administrator provided by NHS Ayrshire and Arran.
This will include ensuring:
• The agenda and papers are prepared and then distributed, following agreement
with the Ayrshire Executive Group, no later than five working days prior to the
meeting.
• Good quality minutes are taken, agreed by the Chair, and that a record of
minutes, attendance and actions are circulated to members no later than five
working days after the meeting.
• Assurance Report will be produced following each meeting and shared with
members for them to use to update their respective organisations on progress. 
• Specific actions or matters arising are taken forward between meetings.
• All papers will be stored and archived so they are available to members at future
dates. 
6.0 Review 
6.1 These Terms of Reference will be reviewed for effectiveness twelve months from their
adoption. 
6.2 Amendments to the Terms of Reference may occur more frequently if required and will
be by agreement of a majority of members.

Page 14

Appendix 1: Structure and Initial Programme Focus Areas 
Appendix 2: Schedule of bi-monthly meetings 
Meeting Date Meeting Time Meeting Format
29 February 2026 14:00-17:00 In person/ MS Teams
21 April 2026 14:00-17:00 In person/ MS Teams
24  June 2026 14:00-17:00 In person/ MS Teams
25 August 2026 14:00-17:00 In person/ MS Teams
20 October 2026 14:00-17:00 In person/ MS Teams
15 December 2026 14:00-17:00 In person/ MS Teams
16 February 2027 14:00-17:00 In person/ MS Teams