Democracy Spraffa

Agenda Document Pack - Cabinet - 30/05/2023

North Ayrshire Council · 30 May 2023
Back to Cabinet — 30 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Cabinet 
A Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
30 May 2023 at 14:30 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minute
The accuracy of the minutes of meeting of the Cabinet held on 2 May
2023 will be confirmed and the Minutes signed in accordance with
Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland) Act
1973 (copy enclosed).  
EDUCATION ITEMS FOR DECISION 
3 School Attainment Results 2022
Submit a report by the Executive Director (Communities and Education)
to update Cabinet on the overall performance of the 2022 North Ayrshire
Council school leavers as highlighted in the INSIGHT benchmarking tool
and Curriculum for Excellence attainment levels in literacy and numeracy
for 2022. (copy enclosed)
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
4 Educational Achievement of Care Experienced Learners in North
Ayrshire in 2022
Submit a report by the Executive Director (Communities and Education)
to update Cabinet on Curriculum for Excellence Broad General Education
(BGE) attainment levels of care experienced learners in 2022, Senior
Phase attainment of care experienced school leavers in 2022 and post-
school participation of care experienced learners. (copy enclosed) 
5 Proposal to amend the primary school catchment boundary between
Saltcoats and Stevenston
Submit a report by the Executive Director (Communities and Education)
to provide feedback to Cabinet on the outcome of the Statutory Public
Consultation and seek approval to amend the primary school catchment
boundary between Mayfield and Glencairn, St Anthony’s and St John’s
Primary Schools. (copy enclosed)  
GENERAL BUSINESS FOR DECISION  
Reports by the Chief Executive 
6 Equality Mainstreaming Report 2020-22 and Outcomes 2021-2025
Mid-Term Report
Submit a report by the Head of Service (Democratic Services) to present
the Equality Mainstreaming Report 2020-22 and Outcomes 2021-2025
Mid-Term Report (encompassing the Education Authority) Mid-Term
Report. (copy enclosed) 
7 Appointment of Older People’s Champion
Submit a report by the Head of Service (Democratic Services) to consider
the appointment of an Older People’s Champion following the resignation
of the previous representative. (copy enclosed) 
8 Revenue Budget 2022/23 : Financial Performance to 31 March 2023
Submit a report by the Head of Service (Finance) to advise Cabinet of the
financial performance for the Council for 2022/23. (copy enclosed) 
9 Capital Programme Performance to 31 March 2023
Submit a report by the Head of Service (Finance) to advise Cabinet of
progress in delivering the Capital Investment Programme for 2022/23.
(copy enclosed)  
Report by the Executive Director (Communities and Education) 
10  Cost of Living Crisis
Submit a report by the Executive Director (Communities and Education)
to provide a second progress report to Cabinet in relation to the North
Ayrshire Council responses to the current cost-of-living crisis and
associated investments and funds. (copy enclosed)
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Reports by the Executive Director (Place) 
11  Regeneration Delivery Plan Action Programme and Funding
Proposals
Submit a report by the Executive Director (Place) to seek approval for the
proposed Regeneration Delivery Plan action programme and funding
proposals. (copy enclosed) 
12  North Ayrshire Community Transport Pathfinder
Submit a report by the Executive Director (Place) to set out initial
proposals for a Community Transport Pathfinder project in North Ayrshire.
(copy enclosed) 
13  Decarbonisation of the Council’s Fleet
Submit a report by the Executive Director (Place) to provide an update on
the journey to date and further proposals to decarbonise the Council’s
vehicle fleet. (copy enclosed) 
14  Ardrossan Harbour Redevelopment Procurement Agreement
Submit a report by the Executive Director (Place) to seek Cabinet’s
agreement to enter a procurement agreement with Ardrossan Harbour
Company Limited to allow the Ardrossan Harbour Redevelopment tender
process to proceed. (copy enclosed) 
15  UK Shared Prosperity Fund – Communities and Place Fund
Submit a report by the Executive Director (Place) to update Cabinet on
the UK Shared Prosperity Fund (SPF) and seek approval of the proposed
approach to the Communities and Place Grant Fund. (copy enclosed)
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
4

Page 5

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Cabinet Sederunt 
Elected Members 
Marie Burns (Chair)
Shaun Macaulay (Vice-Chair)
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen 
Church Representatives 
Mr Andrew Bruce
Ms Elizabeth Turbet
Rev Mark Goodman
Teaching Representative 
Ms Jacqui MacKenzie 
Youth Council Representatives 
Chair: 
Apologies: 
Attending: 
5

Page 6

6

Page 7

Cabinet
2 May 2023 
At a Meeting of the Cabinet of North Ayrshire Council at 2.30 p.m. involving a
combination of participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
Tony Gurney, Marie Burns and Margaret Johnson; and Rev Mark Goodman (Church
Representative) and Jacqui MacKenzie (Teaching Representative) (Agenda Item 3). 
Present (Remote Electronic Participation)
Shaun Macaulay. 
Also Present (Physical Participation)
Cameron Inglis, Chloé Robertson and Davina McTiernan. 
In Attendance (Physical Participation)
C. Hatton, Chief Executive; C. Cameron, Director (Health and Social Care
Partnership); A. Sutton, Executive Director, A. McClelland, Head of Service
(Education) and R. Leith, Head of Service (Connected Communities) (Communities
& Education); M. Boyd, Head of Service and S. Paisley, Senior Manager
(Transformation) (Finance); F. Walker, Head of Service (People and ICT); D.
Hammond, Head of Service (Sustainability, Transport & Corporate Property), L. Kirk,
Interim Head of Service (Economic Development and Regeneration) and E.
McMullen, Senior Manager (Economic Policy) (Place); and A. Craig, Head of
Service, J. Hutcheson, Senior Communications Officer, S. Wilson and C. Stewart,
Committee Services Officers (Democratic Services). 
Apologies
Alan Hill and Christina Larsen and Lay Members Andrew Bruce and Elizabeth
Turbet. 
Chair
Councillor Gurney in the Chair. 
1. Chair’s Remarks 
Prior to commencing with the business of the meeting, Councillor Gurney advised
Cabinet that, notwithstanding the Chair’s presence, he would be standing in for
Councillor Burns as Chair for this meeting, as she was recovering from illness. 
Noted. 
2. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors.
Agenda Item 2
7

Page 8

3. Minutes 
The Minutes of the Meeting of the Cabinet held on 21 March 2023 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the
Local Government (Scotland) Act 1973. 
4. Review of Early Learning and Childcare (ELC) Hourly Rate for Funded
Providers 
Submitted a report by the Executive Director (Communities and Education) seeking
approval to increase the rate of payment to funded providers of early learning and
childcare (ELC) in North Ayrshire contracted by the Council to deliver funded ELC to
eligible 2-5 year-olds. 
Members asked questions and were provided with further information in relation to: 
• the rate proposed and how this compared with that of neighbouring authorities
and the national average; and
• how the Service would engage with providers to encourage participation in the
Scottish Government annual survey as well as a local exercise to continue to
build on working relationships with partners across North Ayrshire. 
The Cabinet agreed (a) to increase the hourly rate paid by the Council to funded
providers for provision of ELC to all entitled children aged 2-5 years from £5.31 to
£5.76 for session 2022-23; (b) that this rate should be paid retrospectively from 1
August 2022, to be in place until 31 March 2024; and (c) to receive a further report
on proposed changes to be implemented from 1 April 2024 following a further review
of the sustainable rate following the national review of the Real Living Wage in
November 2023. 
5. Digital North Ayrshire Strategy 
Submitted a report by the Head of Service (Finance) providing details of the
refreshed Digital Strategy. The Digital Strategy was attached at Appendix 1 to the
report. 
Members asked questions and were provided with further information in relation to: 
• the uptake in registrations since the ‘My Account’ service was introduced and
how further users would be encouraged to sign up for it;
• the internal Digital Innovation Hub and how it was used across the authority;
and
• what supports and information were available for members of the public who
lack confidence in using Information Technology systems. 
The Cabinet agreed to approve the refreshed North Ayrshire Digital Strategy set out
at Appendix 1 to the report. 
8

Page 9

6. Proposals for Community Investment Fund (CIF) Expenditure 
Submitted a report by the Executive Director (Communities and Education) on
applications by Locality Partnerships to allocate CIF funding to proposed projects.
Appendices 1-3, respectively, set out applications by Ardrossan Scouts Group for
£100,000, Ardrossan Community Sports Hub for the early release of £15,000 from a
previously agreed grant and West Kilbride Community Sports Club (WKCSC) and
Friends of Kirktonhall Glen (FOKG) for £6,750. 
The Head of Service (Democratic Services) advised that consideration of the
application from Ardrossan Community Sports Hub for the early release of funds
from a previously approved grant would require suspension of Standing Orders as
the decision to award the grant was taken fewer than six months previously. 
The Cabinet unanimously agreed, in terms of Standing Order 23.1, to suspend
Standing Order 25 to allow consideration of the application for CIF funding from
Ardrossan Community Sports Hub. 
The Cabinet, having reviewed the applications from the North Coast and Cumbraes
and Three Towns Locality Partnerships set out in the appendices to the report in line
with CIF criteria, agreed to approve (a) the award of CIF funding to (i) Ardrossan
Scouts Group in the amount of £100,000 and (ii) the West Kilbride Community
Sports Club and Friends of Kirktonhall Glen in the amount of £6,750; and (b) the
early release of £15,000 of the £100,000 grant to Ardrossan Community Sports Hub
which was approved by Cabinet on 24 January 2023 to facilitate progression of the
project. 
7. Lochshore Hub Lease 
Submitted a report by the Executive Director (Place) seeking approval to provide a
lease of the Lower Ground Floor of the new Lochshore Hub to Garnock Rugby Club.
A plan of the site was attached at Appendix 1 to the report. 
The Cabinet acknowledged and thanked the team for the level of work that was
involved in securing this package of funding, noting that the Lochshore Hub was
welcomed and well-used by the community. 
The Cabinet agreed to approve the lease disposal of the Lower Ground Floor at
Lochshore Hub to Garnock Rugby Club for a period of 25 years at an initial rent of
£5,500 per annum, exclusive of VAT, as detailed in the report and illustrated in the
plan at Appendix 1. 
8. Scottish Government Consultation on Building Community Wealth in
Scotland 
Submitted a report by the Executive Director (Place) on the proposed development
of Community Wealth Building legislation by the Scottish Government and seeking
approval for the proposed submission to the consultation on Building Community
9

Page 10

Wealth in Scotland. The proposed consultation response was set out at Appendix 1
to the report. 
The Cabinet thanked the team for the extensive work carried out in relation to
Community Wealth Building and noted that this was a key component of the
Council’s approach. 
The Cabinet agreed to (a) approve the submission of the proposed consultation
response provided at Appendix 1 to the report; and (b) otherwise note (i) the Scottish
Government’s intention to develop Community Wealth Building legislation in the
current Parliamentary term, (ii) the Council’s participation in the Bill Steering Group
and other Scottish Government events to inform the development of the legislation,
(iii) the extensive cross-service engagement to inform the proposed consultation
response, and (iv) that a separate regional response was being prepared on behalf
of the Community Wealth Building Commission. 
The meeting ended at 3.15 p.m.
10

Page 11

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    School Attainment Results 2022 
Purpose:  To update Cabinet on:
i. The overall performance of the 2022 North Ayrshire
Council school leavers as highlighted in the INSIGHT
benchmarking tool and;
ii. Curriculum for Excellence attainment levels in literacy and
numeracy for 2022 
Recommendation:  That Cabinet:
a) Notes the content of the report, including the progress
being made by learners, specifically in literacy and
numeracy;
b) Notes the achievements of school leavers in SQA
examinations in 2022 and;
c) Approves the measures being taken to make further
improvements to attainment and achievement levels
across all schools. 
1. Executive Summary 
1.1 This report summarises the key performance measures of pupil attainment in the
session 2021-22, based on the benchmarking analysis tool INSIGHT, update released
at the end of February 2023. 
1.2 Highlights include the impact of improvement measures taken in BGE Literacy and
Numeracy to recover from the pandemic. This is demonstrated through significantly
improved “Achievement of a Level” data. 
1.3 North Ayrshire school leavers recorded their highest ever positive destination figure with
nearly 96% achieving an initial positive destination. 
1.4 In the attainment for all measures, performance is continuing to improve following a dip
after the previous change in policy affecting the number of subjects studied in S4. In
2022, leavers from across almost all SIMD deciles in North Ayrshire performed better
than the national average, although there is room for further improvement. 
Agenda Item 3
11

Page 12

2. Background 
2.1 Since 2014, the Scottish Government has produced a customised web interactive
analytical tool to benchmark and inform performance evaluation in schools and
education authorities. INSIGHT is consistent with the Curriculum for Excellence ethos
as it emphasises the best achievement at the point of exit from school1, rather than at
stage-by-stage level, although it still allows users to drill down to cohort, level, subject
or socio-demographic characteristics of pupils. 
2.2 The benchmarking methodology used by INSIGHT is centred on the idea of a "Virtual
Comparator". This virtual school is built around four key characteristics, which
constitutes the make-up of any school. From these four areas, the tool matches ten
leavers from across Scotland to every one of the leavers in each school/authority and
treats this matched group as the virtual school/authority. 
2.3 The main analysis of each year’s attainment and achievement for secondary schools is
released by the Scottish Government in February of the following year of the diet
analysed2. The INSIGHT analysts have also provided the performance of the South
West Education Improvement Collaborative (SWEIC) region as comparison and these
values are represented in the supporting tables and charts3. This Report is structured –
as in previous years - along the four key national benchmarking measures aimed at: 
• Improving attainment in Literacy and Numeracy (% of candidates attaining Literacy and
Numeracy qualifications)
• Improving attainment for all (Average Total Tariff Score distribution)
• Tackling Disadvantage by Improving the Attainment vs. Deprivation Gap (Average Total
Tariff Score by SIMD decile)
• Increasing post-school participation (School Leaver Destinations for 2022). 
2.4 Improving Attainment in Literacy and Numeracy (these highlights are supported by
charts in Appendix 1) 
2.4.1 Performance of North Ayrshire school leavers in attaining Literacy at Level 4 and Level
5 displays a positive 5-year picture. Our schools remain above or in line with the Virtual
Comparator, the SWEIC authorities and the National performance in all 5 years of this
analysis. At level 4, North Ayrshire school leavers increased the gap between their
achievement and the Virtual Comparator and National performance with 95.07%
achieving Level 4. Similarly for Level 5, school leavers also increased the gap between
their achievement and Virtual Comparator and National performance with 83.75% of
learners achieving Level 5. 
2.4.2 The performance of North Ayrshire school leavers in attaining Numeracy at Level 4 and
Level 5 displays a positive 5-year trend with both figures above the Virtual Comparator. 
1 The annual benchmarking "point of exit" indicators published in INSIGHT in February each year are called
"National Benchmarking Measures". The set of similar indicators referring to specific cohorts of pupils on the
school roll (S4, S5, S6) are designated as "Local Benchmarking Measures" in INSIGHT.
2 Therefore, the February 2023 INSIGHT update refers to the performance of the 2022 cohort and – for comparison
- the 4 years before that. The data for previous years’ attainment is annually updated, to account for some
corrections in the national methodology and the inclusion of some school leavers’ records that were not available
at the time.
3 The SWEIC region comprises of North Ayrshire, East Ayrshire, South Ayrshire and Dumfries and Galloway local
authorities.
12

Page 13

For Level 4, 91.18% of leavers achieved this which is the second highest figure in the
5-year trend. Similarly for Level 5, 71.38% of leavers achieved this which is also the
second highest figure in the 5-year trend. 
2.5 Improving attainment for all (These highlights are supported by charts in Appendix 2) 
2.5.1 This measure focuses on the average total tariff score of the candidate’s latest and best
qualifications. Tariff points are assigned to each unit or course achieved by learners –
in all SCQF-graded awards, not only those provided by SQA. This acknowledges to a
greater extent the drive towards wider achievement qualifications and encourages
schools to offer curricular choices tailored to a variety of pupil abilities and aspirations.
The information is presented as the total tariff score per average leaver in one of three
categories of the lowest attaining 20%, the middle attaining 60% and the highest
attaining 20%. 
2.5.2 The average total tariff score for lowest attaining 20% of learners is above the Virtual
Comparator and SWEIC performance and in line with the National Performance.
Although lower than 2021, it is significantly above 2019 and 2020 performance. 
2.5.3 The average total tariff score of the middle attaining 60% of leavers is the second
highest on record in the 5-year trend. Though slightly below the Virtual Comparator, a
positive 5-year trend is evident, particularly in the years since the change of curriculum
structure in S4. The policy on the number of subjects studied in S4 was revised in late
2018, with the first results of this decision being visible in 2020. 
2.5.4 The average total tariff score of the highest attaining 20% of leavers is the highest on
record in the 5-year trend. The figure is above the Virtual Comparator and a consistent
5-year positive trend is evident. 
2.6 Attainment Vs Deprivation (These highlights are supported by charts in Appendix 3) 
2.6.1 The INSIGHT measure aimed at tackling disadvantage presents the Average Total
Tariff Score (ATTS) compared across the SIMD datazone deciles where the school
leavers reside4. 
2.6.2 The Attainment vs. Deprivation chart for 2022 SIMD decile performance shows that
North Ayrshire school leavers in deciles 1 through to 9 have performed above or in-line
with school leavers living in the same SIMD deciles across the rest of the country.
Significantly, this accounts for the vast majority, just over 98%, of our school leavers in
North Ayrshire in 2022. The proportion of school leavers living in SIMD decile 10 in
North Ayrshire is significantly smaller than the national share and the attainment
performance of this group in North Ayrshire remains lower than the national cohort. 
2.7 Increasing Post-School Participation (These highlights are supported by charts in
Appendix 4A and 4B) 
4 The Scottish Index of Multiple Deprivation (SIMD) – 2017 update - ranks the 6976 datazones across Scotland
according to a composite of measures of socio-economic deprivation. The SIMD decile of the area where a pupil
resides using the pupil's postcode is collected as part of the annual School Census. SIMD decile 1 represents the
10% most deprived datazones in Scotland while SIMD decile 10 represents the least SIMD deprived of datazones
in Scotland. INSIGHT has now updated their analysis, which is based on SIMD2020 and the new (redrawn)
datazones based on the 2011 population census.
13

Page 14

2.7.1 At 96%, the proportion of leavers in North Ayrshire moving into an initial positive
destination is the highest on record, above the Virtual Comparator and National
Performance. To maximise the percentage of school leavers entering and sustaining
positive destinations, schools continue to work hard in strong partnership with Skills
Development Scotland. 
2.7.2 The Annual Participation Measure (APM) is a measurement of the proportion of 16-19-
year-olds participating in education, training, or employment over a full year (1st April –
31st March). The indicator provides a measure of the status of the wider aged 16-19
cohort – not just those who have left school. 
2.7.3 The APM has been adopted in the Scottish Government’s National Performance
Framework as the measure of young people’s participation. This has replaced the
school leaver destination follow up as the source of data for the national indicator in the
framework: Percentage of young adults (16-19-year-olds) participation in education,
training or employment. 
2.7.4 The 2022 APM showed that of the 5,785 16-19-year-olds in North Ayrshire, 90.8% were
in education, employment, or training and personal development. This is the second
highest on record since the APM started in 2016. 
2.7.5 As demonstrated in Appendix 4B, the Participation Measure decreases with age. 99.3%
of 16yr olds are engaged in participation which is in line with the national figure. This
figure decreased to 79.7% for 19yr olds which is below the national figure. 
2.8 Attainment in Broad General Education – Attainment of Curriculum for Excellence
Level (ACEL) in P1, P4 and P7 (These highlights are supported by charts in Appendix
5) 
2.8.1 In 2016, the Scottish Government began to collect statistics on the Curriculum for
Excellence level achieved in Literacy (Listening and Talking, Reading, Writing) and
Numeracy by pupils in the Broad General Education stages P1, P4, P7 and S3. This is
based on teacher judgement about each pupil’s achievement of expected level made at
the end of June each session5. This data collection by the Scottish Government was
suspended in 2020 for all schools due to the impact of the pandemic. Data collection 
resumed in 2021 for stages P1, P4 and P7 though not S3. In 2022, data was collected
from all stages (i.e., P1, P4, P7 and S3). 
2.8.2 Appendix 5 presents the summarised attainment levels in Literacy and in Numeracy
overall for the past 5 years, minus 2020 which was not recorded. Achievement figures
for 2022 demonstrate the significant steps taken towards recovery. Combined
Numeracy achievement for P1, P4 and P7 is 76% which represents a 9-percentage
point increase on the previous year and is almost back to the achievement levels before
the pandemic. Similarly, combined Literacy achievement for P1, P4 and P7 is 71%,
which is 8 percentage points higher than the previous year, again almost returning to
pre-pandemic levels. It is evident that the additional interventions in literacy and
numeracy, implemented throughout session 2021-22, have had a significant impact in
continuing recovery from the pandemic. 
5 P1 pupils are expected to attain the Early level in Literacy components and Numeracy by the end of their first
year in school, P4 pupils – First level and P7 Pupils – Second level. S3 pupils are expected to achieve Level 3 or
better in Literacy and Numeracy, with some having also achieved Level 4 by the time they finish their Broad
General Education
14

Page 15

2.9 Proposed Improvement Actions 
2.9.1 The following improvement actions are proposed in respect of the key performance
measures in pupil attainment: 
2.9.2 Improving attainment in Literacy and Numeracy: the service improvement plan includes
specific actions to improve attainment in literacy and numeracy, including: the
implementation of a new learning, teaching and assessment policy; the revision of our
existing literacy and numeracy frameworks; the design and implementation of a 3-year
raising attainment strategy and a further focus on effective moderation across and within
schools. In parallel to this, schools will continue to be supported through school
improvement planning processes, quality assurance processes and the work of the
Professional Learning Academy. 
2.9.3 Improving Attainment for All: There will be a continuation of the focus on the lowest and
highest achieving learners to ensure that our performance continues to reduce the gap
between North Ayrshire and the National performance. Part of our work will include a
further expansion of available courses and units to ensure that the Senior Phase is
meeting the learning needs and aspirations of all learners. The re-designed senior
phase curriculum structures in many schools will also enable further targeted
programmes to be developed for the lowest achieving learners, particularly in S4. 
2.9.4 Attainment versus Deprivation: North Ayrshire’s Attainment Challenge and Pupil Equity
Fund will continue to implement interventions for pupils living in the most deprived areas
to improve their levels of attainment and achievement. Establishments will continue to
focus specifically on the learners living in deciles 3 and 10 to endeavour to bring their
performance into line with national levels. 
2.9.5 Increasing Post-School Participation: To continue and enhance partnerships working
with Skills Development Scotland, Ayrshire College, and the Local Employability
Partnership. 
2.9.6 In addition to the measures outlined above, all secondary schools will make improved
use of the 16+ tab in Seemis Click and Go as a means of identifying target groups more
effectively and consistently across North Ayrshire, thereby enabling interventions to be
more closely tracked across all schools. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Notes the content of the report, including the progress being made by learners,
specifically in literacy and numeracy;
b) Notes the achievements of school leavers in SQA examinations in 2022; and
c) Approves the measures being taken to make further improvements to attainment
and achievement levels across all schools. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None.
15

Page 16

Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 NAC Council Plan 2019-2024: Aspiring Communities: “Children and Young People
Experience the Best Start in Life”. 
This work relates to the following priorities in the Education Service Plan 2022-23:
Priority 1: Improvement in attainment, particularly in literacy and numeracy.
Priority 2: Closing the attainment gap between the most and least disadvantaged
children and young people.
Priority 3: Improvement in skills and sustained, positive school-leaver destinations for
all young people. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 There is a robust Quality Improvement Framework in place to support schools to
evaluate and analyse their performance and plan future improvements. This quality
improvement process features regular evaluative visits to schools by Senior Officers.
These visits feature evidence-based, challenging discussions to explore how school are
using the analysis of their attainment as a mechanism to inform targets for improvement.
Furthermore, as part of our annual review process, we have consulted staff across the
service on the improvement priorities for the coming session, and schools have in turn
engaged with their school communities on their own priorities for improvement. 
Audrey Sutton
Executive Director (Communities and Education) 
For further information please contact Kevin Herron, Senior Manager (Education), on
01294 324450. 
Background Papers
16

Page 17

Appendix 1:   Literacy & Numeracy Charts
Appendix 2:   Attainment for All (2021 –2022)
Appendix 3:   Attainment vs. Deprivation Charts (2021-2022)
Appendix 4A:   Positive Destinations Insight (2021 – April 2022)
Appendix 4B:   Participation Measure Statistics (August 2022)
Appendix 5:   BGE Attainment (2016–2022 Charts)
17

Page 18

90.00
91.00
92.00
93.00
94.00
95.00
96.00
97.00
2018 2019 2020 2021 2022
Percentage of school leavers attaining SCQF level 4
or better in Literacy  
North Ayrshire South West Collaborative
Virtual Comparator National
78.00
79.00
80.00
81.00
82.00
83.00
84.00
85.00
2018 2019 2020 2021 2022
Percentage of school leavers attaining SCQF level 5
or better in Literacy
North Ayrshire South West Collaborative
Virtual Comparator National
87.00
88.00
89.00
90.00
91.00
92.00
93.00
2018 2019 2020 2021 2022
Percentage of school leavers attaining SCQF level 4
or better in Numeracy  
North Ayrshire South West Collaborative
Virtual Comparator National
63.00
64.00
65.00
66.00
67.00
68.00
69.00
70.00
71.00
72.00
73.00
2018 2019 2020 2021 2022
Percentage of school leavers attaining SCQF level 5
or better in Numeracy
North Ayrshire South West Collaborative
Virtual Comparator National
Appendix 1
18

Page 19

2018 2019 2020 2021 2022
North Ayrshire 1785 1665 1797 1862 1914
South West Collaborative 1793 1770 1865 1931 1933
Virtual Comparator 1786 1746 1875 1927 1895
National 1851 1829 1930 1998 1968
1600
1700
1800
1900
2000
Attainment for All - Average total tariff score of the highest
attaining 20%
2018 2019 2020 2021 2022
North Ayrshire 815 697 782 845 819
South West Collaborative 817 770 829 889 842
Virtual Comparator 795 734 830 891 821
National 858 821 888 955 887
650
700
750
800
850
900
950
1000
Attainment for All - Average total tariff score of the middle
attaining 60%
2018 2019 2020 2021 2022
North Ayrshire 170 145 140 161 156
South West Collaborative 169 151 145 165 155
Virtual Comparator 141 119 127 159 141
National 164 151 151 165 156
110
120
130
140
150
160
170
180
Attainment for All - Average total tariff score of the lowest
attaining 20%
Appendix 2
19

Page 20

Page 1 of 2
687
725 755
932
1068
1028
1098
1246 1258
1239
666
703
779
826
916
970
1051
1125
1234
1391
350
550
750
950
1150
1350
1550
0 1 2 3 4 5 6 7 8 9 10 11SIMD Decile
Average Total Tariff Score by SIMD decile ‐ All School leavers 2022
North Ayrshire National Trend line ‐ North Ayrshire Trend line ‐ National
Appendix 3
20

Page 21

Page 2 of 2
657
767 842
959
1070
1156
1099
1222 1192
1306
689
754
816
893
970
1027
1106
1163
1269
1433
350
550
750
950
1150
1350
1550
1750
0 1 2 3 4 5 6 7 8 9 10 11SIMD Decile
Average Total Tariff Score by SIMD decile ‐ All School leavers 2021
North Ayrshire National Trend line ‐ North Ayrshire Trend line ‐ National
Appendix 3
21

Page 22

95.6
94.0
92.5
95.2
96.0
94.2 94.4 94.3
95.8
96.7
93.2
94.0
92.3
95.1 94.9
94.4
95.1
93.4
95.5
95.7
90.0
91.0
92.0
93.0
94.0
95.0
96.0
97.0
98.0
2017/18 2018/19 2019/20 2020/21 2021/22
Comparative Performance on % of School Leavers  Moving into Positive 
Destinations
North Ayrshire South West Collaborative Virtual Comparator National
Appendix 4
22

Page 23

90.8
99.3 95.4 88.5
79.7
92.4 99.3 96.3 89.8 84.2
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
% All 16‐19 year‐olds %16‐year‐olds %17‐year‐olds %18‐year‐olds %19‐year‐olds
Participation Rate_August 2022
North Ayrshire Scotland
Appendix 4B
23

Page 24

77% 80% 79%
67%
76%
69% 72% 74%
59%
67%
76% 78% 79%
75% 78%
69% 71% 72%
67%
71%
2017 2018 2019 2021 2022 2017 2018 2019 2021 2022
NUMERACY LITERACY
Curriculum for Excellence Attainment in Literacy and Numeracy - P1,
P4, P7 - combined
NAC National
Appendix 5
24

Page 25

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Educational Achievement of Care Experienced Learners in
North Ayrshire in 2022 
Purpose:  To update Cabinet on:
i. Curriculum for Excellence Broad General Education (BGE)
attainment levels of care experienced learners in 2022;
ii. Senior Phase attainment of care experienced school leavers
in 2022;
ii. Post-school participation of care experienced learners 
Recommendation:  That Cabinet:
a) Notes the content of the report, including the progress being
made by learners, specifically in literacy and numeracy;
b) Notes the achievements of school leavers in SQA
examinations in 2022. 
1. Executive Summary 
1.1 This report summarises the key performance measures of care experienced1 and
looked after learners2, focusing specifically on the published 2022 attainment data and
trends over time. Overall, educational outcomes for care experienced learners have
improved over the last five years. However, there remains a significant gap between the
educational outcomes achieved by care experienced learners and all learners, both in
North Ayrshire and nationally. 
1.2 Care experienced school leavers are achieving better in literacy and numeracy than
their counterparts nationally and in the South West Educational Improvement
Collaborative (SWEIC) and there has been a positive trend in average total tariff score
over the last 5 years. The proportion of care experienced learners entering a positive
destination has been above the national figure for the last 5 years. 
1 Care Experienced is a term we use in education; it has no statutory basis. Care experienced is an umbrella term which
can mean children / young people who are: Looked after at home through a Compulsory Supervision Order; Looked
after away from home; Previously looked after, where at some point in their lives they have had any of the above
experiences. 
2 Looked after young people include those: Looked after at home through a Compulsory Supervision Order (CSO) or
Looked after away from home in a residential children’s house, in a foster placement or a kinship placement. 
Agenda Item 4
25

Page 26

2. Background 
2.1 Care experienced young people are categorised for the purposes of our management
information system SEEMIS as: Looked After at Home, Looked After Away from Home
and Previously Looked After. The total number of care experienced young people in
North Ayrshire at the annual census date in September each year is shown in the charts
in Appendix 1. In 2022 there were 842 care experienced young people enrolled in North
Ayrshire schools. 
2.2 This report focuses on the following key measures: 
• Attainment in Literacy and Numeracy across the Broad General Education for care
experienced learners for 2022. 
• Attainment in Literacy and Numeracy and overall attainment in all qualifications at
Senior Phase level for care experienced school leavers in 2022. 
• Average Total Tariff Score of school leavers and the impact of the stage at which they
leave school. 
• Post-school participation of care experienced school leavers for 2022. 
2.3 Attainment in Literacy and Numeracy in Broad General Education for Care
Experienced Learners (These highlights are supported by charts in Appendix 2) 
2.3.1 The charts at Appendix 2 indicate that the attainment of care experienced learners at
BGE stages P1, P4 and P7 continues to recover steadily towards pre-pandemic levels.
At all stages, achievement of Literacy and Numeracy levels have increased for care
experienced learners from 2021 figures. This mirrors the recovery journey overall for all
learners in North Ayrshire, with a similar pattern occurring for the full cohort groups.
Nevertheless, there remains a gap between the achievement of care experienced
learners and all learners across North Ayrshire. 
2.4 Attainment in Literacy and Numeracy and overall attainment in all qualifications
at Senior Phase level for Care Experienced school leavers (These highlights are
supported by charts in Appendices 3-5) 
2.4.1 It should be noted that the cohort size for care experienced school leavers varies from
year to year and is generally between 40-50 young people. Therefore, care must be
taken when analysing variations in performance for this group. For example, one care
experienced learner attaining/not attaining a specific qualification may account for more
than 2 percentage points of a difference in the overall attainment measures for care
experienced learners (whereas in the general population, one pupil would make less
than 0.07 percentage points of a difference in the same attainment measure). 
2.4.2 Performance in Literacy and Numeracy at SCQF levels 4 and 5 is consistently lower for
care experienced leavers than for the overall school leaver cohort in North Ayrshire.
However, North Ayrshire care experienced school leavers perform generally better than
their counterparts nationally and in the SWEIC authorities (see Appendix 3). 
2.4.3 For Level 4 Literacy (81.6%) and Numeracy (79.6%), care experienced leavers in North
Ayrshire are above both the National and the SWEIC performances. These figures are
also the highest recorded in the 5-year trend. For Level 5 Literacy (51%) and Numeracy
(32.7.%), leavers are also above both the National and SWEIC performances. 
26

Page 27

2.4.4 Care experienced leavers in North Ayrshire are continuing a positive 5-year trend of
attainment in the number of Level 4 and Level 5 qualifications achieved (see Appendix
4). In 2022, 90.3% of North Ayrshire’s care experienced leavers attained at least one
qualification at SCQF Level 4 or better, the highest performance in 5-year trend. In
2022, 67.7% of care experienced leavers achieved at least one qualification at SCQF
Level 5, which is also the highest performance in the 5-year trend. The percentage of
care experienced learners achieving at least 1 Level 6 award fell in comparison to 2021
with 34.4% achieving this. However, this is in line with all school leavers and at 34.4%,
this is still the second highest performance for NAC care experienced leavers in the last
5 years. 
2.4.5 The average total tariff score for NAC care experienced leavers continues to increase,
with the figure in 2022 rising to 457, the best performance to date. There is still a
significant gap between the attainment of care experienced learners and those who are
not care-experienced, both locally and nationally. In North Ayrshire, the gap is gradually
closing. Over the last three years from 2020-22, the gap between care experienced
average total tariff scores and all North Ayrshire school leavers has been on average
491 points, compared to an average of 526 points for the three years previously from
2017-2019. Whilst this is clear progress, there is still a significant amount of work to be
done to reduce the gap more consistently and at a faster rate. 
2.5 Post-school participation of care experienced school leavers (These highlights are
supported by charts in Appendix 6) 
2.5.1 The overall percentage of North Ayrshire care experienced school leavers entering a
positive destination has remained consistently above the national performance for this
group over the last five years. In 2022, the percentage of NAC care experienced school
leavers in a positive destination is 91.4%, the 2nd highest figure recorded since 2016. 
2.6 Proposed Improvement Actions 
The Education Service continues to focus on improving positive outcomes for care
experienced learners at all stages. It is acknowledged that, whilst educational outcomes
for care experienced learners have improved over time, there is still significant scope
for further improvement. Attainment and achievement for this group of learners is an
area of focus during quality improvement visits in all schools and the annual attainment
review in each secondary school. The Education Service Improvement Plan makes
specific reference to actions impacting positively on care experienced learners. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Notes the content of the report, including the progress being made by learners,
specifically in literacy and numeracy;
b) Notes the achievements of school leavers in SQA examinations in 2022. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
27

Page 28

Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Tackling inequality is a key aspect of this report. The Council is committed to a
continued focussed approach to improve outcomes for care experienced leavers. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 NAC Council Plan 2019-2024: Aspiring Communities: “Children and young people
experience the best start in life”. 
This work relates to the following priorities in the Education Service Plan 2022-23: 
Priority 1: Improvement in attainment, particularly in literacy and numeracy
Priority 2: Closing the attainment gap between the most and least disadvantaged
children and young people
Priority 3: Improvement in skills and sustained, positive school-leaver destinations for
all young people 
Community Wealth Building 
4.7 The Council will continue to consider the pillars of community wealth building in any
future developments in this area. 
5. Consultation 
5.1 None specifically related to this report. 
Audrey Sutton
Executive Director (Communities and Education) 
For further information please contact Kevin Herron, Senior Manager (Education), on
01294 324450. 
Background Papers
Appendix 1: LAC Census Rolld (2014-2022)
Appendix 2: Care Experienced ACEL (2019-2022)
Appendix 3: LAC Leavers Literacy & Numeracy attainment insight (2022)
Appendix 4: Care Experienced and LAC Leavers Highest SCQF Levels
28

Page 29

Appendix 5: Care Experienced and LAC Leavers ATTS
Appendix 6: Insight LAC Leavers entering Positive Destination 2016-2022) 
29

Page 30

218 273 291 211 239 224 217 208 204
337
367 384
351 346 344 370 346 342
186
174 176
277 293 330 322 294 296
0
100
200
300
400
500
600
700
800
900
1000
2014 2015 2016 2017 2018 2019 2020 2021 2022
Care Experienced Pupils ‐ All Schools
At home Away From Home Previously Looked After
Appendix 1
30

Page 31

-23.3
-25.9
-31.1
-28.9
-6.8
-22.7
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Numeracy Literacy
PERCENTAGE OF CHILDREN ACHIEVING CFE LEVEL
North Ayrshire CE attainment gap P1 - Early Level - 2022,
2021, 2019 (percentage points)
Care Experienced Children - 2019 All pupils (not CE) 2019
Care Experienced Children - 2021 All pupils (not CE) - 2021
Care Experienced Children - 2022 All pupils (not CE) - 2022
Appendix 2
-30.7 -30.6
-26.5
-30.7
-27.9
-27.9
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Numeracy Literacy
PERCENTAGE OF CHILDREN ACHIEVING CFE LEVEL North Ayrshire CE attainment gap P4 - First Level -
2022,2021, 2019 (percentage points)
Care Experienced Children - 2019 All pupils (not CE) 2019
Care Experienced Children - 2021 All pupils (not CE) - 2021
Care Experienced Children - 2022 All pupils (not CE) - 2022
-32.1 -26.3-30.0
-31.7
-35.0 -34.2
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Numeracy Literacy
PERCENTAGE OF CHILDREN ACHIEVING CFE LEVEL North Ayrshire CE attainment gap P7 - Second Level - 2022,
2021, 2019 (percentage points)
Care Experienced Children - 2019 All pupils (not CE) 2019
Care Experienced Children - 2021 All pupils (not CE) - 2021
Care Experienced Children - 2022 All pupils (not CE) - 2022
31

Page 32

71.7
55.0
40.0
33.3
71.2
61.5
41.0
27.1
70.3
58.8
37.2
29.1
75.0
71.2
40.2
28.0
76.8
70.7
44.6
30.1
81.6 79.6
51.0
32.7
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
65.0
70.0
75.0
80.0
85.0
90.0
% Level 4 Literacy % Level 4 Numeracy % Level 5 Literacy % Level 5 Numeracy
LAC attainment in Literacy and Numeracy ‐ North Ayrshire vs. National and SWEIC ‐
2020‐2022 (percentage attaining out of annual leavers' cohort)
NAC 2020 NAC 2021 NAC 2022
National 2020 National 2021 National 2022
SWEIC 2020 SWEIC 2021 SWEIC 2022
Appendix 3
32

Page 33

85.1% 84.7%
77.2%
86.1% 90.3%
80.9% 77.4% 76.9% 80.3%
87.8%
98.1% 97.3% 97.1% 97.4% 97.3%
70.9% 69.8% 71.8% 70.9%
N/A
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
2017/18 2018/19 2019/20 2020/21 2021/22
Percentage of School Leavers achieving 1 or more qualification at
SCQF level 4 or better
NAC Care experienced NAC Looked After NAC All Other Leavers (not CE) Looked after leavers - National
50.0% 50.6% 53.2%
62.4% 67.7%
40.4% 37.7%
53.8% 50.8%
67.3%
89.9% 89.4% 88.6% 91.7% 89.9%
36.1% 34.6% 38.1% 37.6%
N/A
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
2017/18 2018/19 2019/20 2020/21 2021/22
Percentage of School Leavers achieving 1 or more qualification
at SCQF level 5 or better
NAC Care experienced NAC Looked After NAC All Other Leavers (not CE) Looked after leavers - National
20.3%
27.1% 29.1%
40.6%
34.4%
10.6% 17.0%
30.8% 32.8%
26.5%
68.0% 67.5% 69.8% 73.0% 70.2%
11.9% 10.6% 14.2% 14.9% N/A
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
2017/18 2018/19 2019/20 2020/21 2021/22
Percentage of School Leavers achieving 1 or more qualification
at SCQF level 6 or better
NAC Care experienced NAC Looked After NAC All Other Leavers (not CE) Looked after leavers - National
Appendix 4
33

Page 34

324
382
295
252
404
348 377
332 383
352 327
393
448
457
919 917 911
811
888
949 935
282 293
291 273 293
341 378
0
100
200
300
400
500
600
700
800
900
1000
2016 2017 2018 2019 2020 2021 2022
Average Total Tariff Score for LAC, Care Experienced and all non‐LAC School 
Leavers NAC vs. National performance for LAC children
North Ayrshire LAC North Ayrshire Care Experienced NAC all Leavers ‐ not Care Experienced* National ‐ LAC Leavers
Appendix5
*not looked after and not previously looked after‐ and unable to determine status for 2016 only
34

Page 35

83.0
87.3
80.9
83.0 84.6
93.4
85.7
73.6
76.4
80.4
82.4 81.4
87.9
86.0
73.1
77.9 80.0
76.5
86.7
91.9
88.6
83.1
88.1
83.8
88.2
84.8
94.1
91.4
95.5
93.7
96.3
94.4
93.0
95.3
96.3
70.0
75.0
80.0
85.0
90.0
95.0
100.0
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
Percentage of Care Experienced and Looked After Leavers entering a 
Positive Destination
North Ayrshire ‐ LAC National ‐ LAC South West Collaborative ‐ LAC
Care Experienced ‐ NAC Leavers not Care Experienced ‐ NAC
Appendix 6
35

Page 36

36

Page 37

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Proposal to amend the primary school catchment
boundary between Saltcoats and Stevenston 
Purpose:  • To provide feedback to Cabinet on the outcome of the
Statutory Public Consultation.
• To seek approval to amend the primary school catchment
boundary between Mayfield and Glencairn, St Anthony’s and
St John’s Primary Schools. 
Recommendation:  That Cabinet agrees to:
• Note the content of the Consultation Report at Appendix 1 of
this document.
• Amend the primary school catchment boundary lines between
Mayfield and Glencairn, St Anthony’s and St John’s Primary
Schools from August 2023. 
1. Executive Summary 
1.1 On 29 November 2022, as a result of a new housing development in Saltcoats, Cabinet
agreed to commence a Statutory Public Consultation on the proposal to amend the
catchment boundary lines between the following primary schools: 
• Mayfield Primary School
• Glencairn Primary School 
• St Anthony’s Primary School
• St John’s Primary School 
1.2 The consultation opened on Monday 9 January and closed on Thursday 2 March 2023.
Thereafter, Education Scotland provided their report and a copy of this is attached as
Appendix 3 to the Council’s Consultation Report (Appendix 1 of this report).  This was
made available to the public from 17 April to 7 May 2023.   
1.3 Twenty-five formal online responses were received, however 2 of these were not valid
as the respondents referred to another building development in Saltcoats and not the
Mayfields site, the development which has highlighted the issue under consideration. 
Two respondents agreed with the proposal and 21 were against. 
Agenda Item 5
37

Page 38

1.4 A further 56 responses were received from P4-7 pupils across the four directly affected
primary schools.  These were equally split, with half of the children supporting the
proposal and others that have some reservations. 
1.5 Various themes emerged across all responses received.  The Council has set these
out, along with its response to each theme, in its report at Appendix 1 of this document. 
Education Scotland is of the view that the proposal to change the catchment areas as
stated by the Council is sufficient in terms of educational benefits.  Although around half
of stakeholders who met with HM Inspectors are opposed to the proposals, HM
Inspectors are satisfied that the Council has systems in place to carefully manage
school admissions. 
1.6 All responses received were carefully considered and the proposal was reviewed taking
these into account.  The report at Appendix 1 aims to respond and reassure the public
that the proposal has been robustly developed.  After reviewing and considering all
responses, feedback from the public meeting and Education Scotland’s report, North
Ayrshire Council’s proposal to amend the primary school catchment boundaries remains
unchanged.  Cabinet is therefore asked to approve the report recommendation from
August 2023. 
2. Background 
2.1 On 29 November 2022, Cabinet agreed to commence a Statutory Public Consultation. 
The Proposal Document was emailed to statutory consultees on 9  January 2023. 
The link to the document was made available to all parents/carers  via email and
copies were also available from: 
• All Saltcoats and Stevenston Primary Schools
• Saltcoats Town Hall and Saltcoats Library
• Stevenston Library
• Cunninghame House, Irvine KA12 8EE, or
• By calling 01294 324442 
2.3 The formal responses received are set out in the table below.  Of the 25 formal online 
responses received, 2 were deemed to be invalid as the respondents referred to 
separate Saltcoats Persimmon site.  Two respondents agreed with the proposal and 
21 were against. 
Response Yes  No Not valid
Number 2 21 2
Breakdown 1 1 12 8 1 1 1
Interest
Parent/
carer Other  Staff
Parent/
carers Other Staff Other 
38

Page 39

2.4 Key themes that emerged can be summarised as follows: 
• Pupil numbers within classes
• Capacity at Mayfield and St Anthony’s Primary Schools
• Occupancy at St John’s and Glencairn Primary Schools
• Transition, particularly from Mayfield PS Early Years Class into P1
• Traffic management 
2.5  Children in P4-7 across the 4 directly affected primary schools were asked to 
complete an online form to share their thoughts and views on the proposal. In 
consultation with the Head Teacher, the following questions were asked: 
(i) New houses are being built beside Tesco and the Council would like these children to
go to St Anthony’s Primary School or Mayfield Primary School.  Do you agree with this? 
(ii) Why have you answered yes or no to the question? 
2.5.1 A total of 56 responses were received from pupils and the table below provides a
breakdown of the answers to question (i): 
School Yes No
Glencairn Primary 6 10
Mayfield Primary 10 2
St Anthony's Primary 11 5
St John's Primary 1 11
Total 28 28 
2.6  Key themes from the primary school pupils can be summarised as follows: 
• Making new friends 
• Going to the closest school
• Are the schools big enough for the extra children?
• Being able to choose their school
• Low pupil numbers at St John’s Primary School 
2.7 The Council welcomes all feedback and is grateful to all who participated in the 
Statutory Public Consultation.  The detail of all issues raised and the Council’s 
response to these is contained within the published report at Appendix 1. 
2.8 The consultation closed on 2 March 2023 and all documents were sent to  Education 
Scotland. The Schools (Consultation) (Scotland) Act 2010 requires  that Education 
Scotland provides an independent and impartial consideration of this proposal.  In 
preparing their report, HM Inspectors undertook the following activities: 
• Attendance at the public meeting held on 18 January 2023 in connection with the
Council’s proposals;
39

Page 40

• Consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others;
• Visits to the sites of Mayfield, Glencairn, St John’s and St Anthony’s primary schools,
including discussion with relevant consultees; and
• Engagement with the Diocesan Representative for North Ayrshire. 
2.9  Education Scotland is of the view that the proposal to change the catchment areas 
as stated by the Council is sufficient in terms of educational benefits. Although 
around half of stakeholders who met with HM Inspectors are opposed to the 
proposals, HM Inspectors are satisfied that the council have systems in place to 
carefully manage school admissions to the schools impacted.   
2.10 After reviewing and considering all responses, feedback from the public meeting 
and Education Scotland’s report, North Ayrshire Council’s proposal to amend the 
primary school catchment boundaries remains unchanged. The Council’s 
Consultation report, attached as Appendix 1 of this report, aims to reassure the public 
that the proposal has been robustly developed. 
2.11 Maintaining the current catchment boundaries would mean that children with a 
Saltcoats address would live in the catchment area for a primary school in 
Stevenston.   The key aim of this proposal is to provide children with a place at the 
primary school nearest to their home, along with their neighbours and to be able to 
walk a short distance to school.  The proposal will, through the creation of new 
catchment boundaries, offer a more equitable split of pupil numbers in the Saltcoats 
area.  Access to reliable local data allows the Council  to strategically forward plan to 
accommodate appropriate education provision for future years and parents/carers 
will still be able to exercise choice of school via the existing placing request process. 
On balance, this proposal best meets the educational and wellbeing needs of all 
children who will live in the area. 
3. Proposals 
3.1 That Cabinet agrees to: 
• Note the content of the Consultation Report at Appendix 1.
• Amend the primary school catchment boundary as proposed from August 2023. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications directly arising from this report. 
Human Resources 
4.2 There are no human resource implications arising from this report. 
Legal 
4.3 The process being followed is in accordance with the Schools (Consultation)
(Scotland) Act 2010.
40

Page 41

Equality/Socio-economic 
4.4 They key aim of this proposal is to provide children with a place at the primary 
school nearest their home, along with their neighbourhood peers. This includes 
continuity in support of their education and social development and plays a 
significant role in the early social cohesion of the new community which this 
significant housing development will deliver. 
Climate Change and Carbon 
4.5 The proposal should support walking to school.  The proposed boundary change
creates a local catchment area, with a walk of less than 0.5 miles from the new
development to Mayfield Primary School.  St Anthony’s Primary School is 0.7 miles from
the new housing development, whilst St John’s Primary School is 1.8 miles away, along
a busy main road with Glencairn PS located 1.3 miles away from the new development.   
Key Priorities 
4.6 Inspiring Place 
Vibrant, welcoming, and attractive places 
An efficient Council that maximises resources and provides value for money 
Community Wealth Building 
4.7 None arising from this report. 
5. Consultation 
5.1 Early engagement took place in the form of meetings with Head Teachers in June
2022, with follow up discussions and a meeting with Parent Council Chairpersons in
August 2022.  Full Consultation then took place with the Head Teachers and Parent
Councils of the 4 directly affected primary schools.  Local Elected Members have also
been consulted. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Lynn Taylor, Senior Manager, on (01294) 324437. 
Background Papers
Appendix 1:  Catchment Boundary Amendment = Consultation Report
41

Page 42

CONSULTATION REPORT 
Proposal to amend the primary school catchment boundary,
directly affecting the following schools: 
Mayfield Primary School
Glencairn Primary School
St Anthony’s Primary School
St John’s Primary School 
REPORT BY EXECUTIVE DIRECTOR
COMMUNITIES AND EDUCATION DIRECTORATE 
This document has been issued by North Ayrshire Council for consultation in terms of the
Schools (Consultation) (Scotland) Act 2010 
This document can also be made available in other formats and community languages. 
Please apply in writing to North Ayrshire Council, Communities and Education Directorate,
Cunninghame House, Friars Croft, Irvine, KA12 8EE; by telephone on 01294 324442; or by
email at educ_consultation@north-ayrshire.gov.uk. 
42

Page 43

Page 2 of 10 
North Ayrshire Council
Communities and Education Directorate 
Primary School Catchment Boundary Amendment 
Table of Contents 
1  The Purpose of the Consultation Report ................................................................. 3 
2  Background  ............................................................................................................ 3-4 
3  The Proposal .............................................................................................................. 4 
4  The Formal Statutory Public Consultation Process ............................................ 4-7 
5  Consultation with Pupils ........................................................................................ 7-8 
6  Education Scotland’s Report and the Council’s Response  ............................. 8-10 
7  Next Steps  ................................................................................................................10 
8  Conclusion ................................................................................................................10 
List of Appendices 
Appendix 1 - Proposal Document
Appendix 2 - Note of Public Meeting
Appendix 3 - Education Scotland Report 
43

Page 44

Page 3 of 10 
NORTH AYRSHIRE COUNCIL 
COMMUNITIES AND EDUCATION DIRECTORATE 
CONSULTATION REPORT 
1. THE PURPOSE OF THE CONSULTATION REPORT 
In line with the Schools (Consultation) (Scotland) Act 2010, North Ayrshire Council is
required to: 
 set out the total number of written representations made to the Council by any
person during the period of the public consultation exercise; 
 set out a summary of those written representations; 
 set out a summary of the oral representations made to the Council at the public
meeting held at Saltcoats Town Hall on 18 January 2023 
 set out a statement of the Council’s response to: 
 those written and oral representations; and
 Education Scotland’s report. 
 provide a copy of Education Scotland’s report; 
 set out a statement explaining how the Council reviewed the above proposal having
had regard (in particular) to: 
 the relevant written representations received by the Council during the public
consultation period:
 oral representations made to it at the public meeting detailed above; and
 Education Scotland’s report. 
 provide details of any alleged omission from, or inaccuracy in, the Proposal
Document and a statement of any action taken where necessary. 
2. BACKGROUND 
2.1 A planning application was approved in November 2019 for up to 370 new homes at
the Mayfields site, behind the current Tesco supermarket, High Road, Saltcoats.  The
site layout provided shows that new homes will be built over the existing primary school
catchment boundary lines.  This required the catchment arrangements to be reviewed. 
2.2 Various options were considered, as set out in the Proposal Document attached at
Appendix 1.  After early engagement with the local school communities, the
recommended option was to rezone all the new homes to Mayfield Primary School, for
non-denominational education, and St Anthony’s Primary School for denominational
education. 
44

Page 45

Page 4 of 10
2.3 This option makes geographical sense and, importantly, will provide children with a
place at the primary school nearest their home, along with their neighbourhood peers.
Current pupil roll projections indicate that the schools can accommodate the anticipated
change to pupil numbers.  As a result of the proposed change, the catchment area for
Mayfield Primary School would be of a comparable size to those at Ardeer and
Blacklands primary schools, both of which operate with a similar number of classes to
Mayfield Primary School. 
3. THE PROPOSAL 
3.1 At its meeting on 29 November 2022, North Ayrshire Council Cabinet agreed to the
commencement of a Statutory Public Consultation (SPC) on the proposal: 
(i) To amend the Mayfield Primary School catchment boundary line to include the
whole of the Mayfields housing development 
(ii) To amend the St Anthony’s Primary School catchment boundary line to include
the whole of the Mayfields housing development 
3.2 Should the proposal be approved, the P1 intake at Mayfield Primary School will be
monitored closely and capped when required, in order to ensure that there are sufficient
places for catchment children in future years. 
4. THE FORMAL STATUTORY PUBLIC CONSULTATION PROCESS 
4.1 A Proposal Document (Appendix 1) was developed and published on the Council’s
Community Planning Partnership website.  A printed copy was made available at: 
 NAC HQ, Cunninghame House, Irvine KA12 8EE
 All Saltcoats and Stevenston Primary Schools
 Saltcoats Town Hall and Saltcoats Library
 Stevenston Library
4.2 The consultation was open from Monday 9 January to Thursday 2 March 2023.  The
Proposal Document was sent by email to all statutory consultees listed in the Proposal
Document.  The link to the document was also made available to all parents/carers at
affected schools via email. 
4.3 A public meeting was held at Saltcoats Town Hall, Countess Street, Saltcoats on 18 
January 2023.  The official note of this meeting can be found at Appendix 2.  The 
meeting was advertised via public notice in the Ardrossan and Saltcoats Herald on the 
following dates: 
 Wednesday 4 January 2023
 Wednesday 11 January 2023
 Wednesday 18 January 2023 
The meeting was also advertised on the community radio station, 3TFM. 
4.4 Views on the proposal were encouraged, using the following methods: 
 Completing an online response form via MS Forms;
45

Page 46

Page 5 of 10
 Submitting a paper copy of the response form;  
 Writing to the Head of Service (Education), Communities Directorate, North Ayrshire
Council, Cunninghame House, Irvine, KA12 8EE; or
 Emailing educ_consultation@north-ayrshire.gov.uk. 
4.5 After considering the information provided within the proposal document and
appendices, stakeholders were asked to respond to the following questions: 
 “Do you agree with the proposal to amend the catchment boundary in order to
rezone the Mayfields Persimmon housing development to Mayfield Primary School
and St Anthony’s Primary School?” 
 “Please give your reasons below.” 
4.6 A total of 25 formal responses were received, all online, via MS Forms.  Two of these
responses are not valid – the respondents referred to another Saltcoats Persimmon
site, not Mayfields.  This information was sent to both respondents.  Of the valid
responses, two were in favour of the proposal and 21 were against.  The table below
sets out the responses, and details the respondents’ connection with the proposal: 
Response Yes  No Not valid
Number 2 21 2
Breakdown 1 1 12 8 1 1 1
Interest
Parent/
carer Other  Staff
Parent/
carers Other Staff Other 
4.7 There were 7 attendees at the public meeting: 
 A parent
 2 NAC Local Members
 3 NAC school management staff members
 Education Scotland representative
4.8 The themes that emerged from the representations at the public meeting and from the
formal responses can be categorised as follows: 
(i) Pupil numbers within classes
(ii) Capacity at Mayfield and St Anthony’s Primary Schools
(iii) Occupancy at St John’s and Glencairn Primary Schools
(iv) Transition, particularly from Mayfield PS Early Years’ Class into P1
(v) Traffic management
4.9 The Council welcomes all feedback and is grateful to those who participated in the 
Statutory Public Consultation.  Responses to the issues raised are set out below: 
4.9.1 Pupil numbers within classes 
Class sizes are legally limited to 33 for P4-7, 30 for P2-3 and 25 for P1 and composite
classes.  Our teachers are well-equipped to deliver education to classes of these sizes
and children are grouped as efficiently as possible for each new school session.  Roll
projections show that the space available within Mayfield and St Anthony’s Primary
Schools can sufficiently accommodate classes of these sizes.   
46

Page 47

Page 6 of 10
Children who live within the new proposed catchment areas will be allocated school
places first, resulting in fewer places expected to be available for allocation to placing
requests from children outwith the catchment area, in the future.  Implementing the
proposal would result in a higher proportion of catchment children attending schools in
the area. 
4.9.2 Capacity at Mayfield and St Anthony’s Primary Schools 
As outlined above at 4.9.1, each year, there are a high number of placing requests into
Mayfield Primary School.  Further concerns were raised regarding the overall capacity
of the school buildings.   
Based on the Mayfields housing development taking place over a ten-year period, the
roll projection shows that Mayfield and St Anthony’s Primary Schools will have capacity
to accommodate the expected increase in pupil numbers.  This situation will be closely
monitored going forward, in order to manage numbers effectively. Staffing levels and
year group arrangements will continue to be planned efficiently across all of the schools. 
Although not directly affected by the proposal, Dykesmains Primary School could see
more of their catchment children enrolling in the future as currently children from this
area make up a significant number of the placing requests into Mayfield Primary School. 
4.9.3 Occupancy at St John’s Primary School 
Some respondents were concerned about low occupancy at St John’s Primary School,
where the roll has fallen in recent years and these concerns are duly noted.  However,
projections show that continuing with the current catchment arrangements is likely to
result in only 1 additional pupil per year at St John’s Primary School and that
maintaining the current catchment boundary would have a minimal effect on the
denominational schools.   
The reducing roll at St John’s Primary School should be considered in the wider context
of a general decline in birth rates and primary school pupil numbers across North
Ayrshire, which is unrelated to this proposal.  On balance, the Council feels that this
proposal best meets the educational and wellbeing needs of all children who will live in
the area.  Parents/carers will still be able to exercise choice of school via the existing
placing request process. 
4.9.4 Transition, particularly from Mayfield PS Early Years’ Class into P1 
One respondent raised a concern regarding the future availability of P1 places for non-
catchment children who may attend Mayfield PS Early Years’ Class.  As there are no  
catchment areas for early years, parents will require to consider the likely availability of  
places at Mayfield Primary School when selecting the appropriate early years provision  
for their child.   
4.9.5 Traffic management 
Traffic around schools can be problematic and requires careful management.  The  
proposed boundary change creates a local catchment area, with a walk of less than 0.5  
miles from the new development to Mayfield Primary School, where the majority of the  
children from the new development will attend.  St Anthony’s Primary School, which will  
accommodate the denominational pupils under this proposal, is 0.7 miles from the new  
housing development.  
47

Page 48

Page 7 of 10
Given the relatively short distances between the development and the proposed
catchment schools, traffic may in fact be reduced as a result as more children may to
walk to school. 
St John’s Primary School is 1.8 miles away with Glencairn PS located 1.3 miles away  
from the new development. 
5. CONSULTATION WITH PUPILS 
5.1 The Council recognises the importance of seeking the views of learners and their school 
communities.   
A guiding principle of ‘Scotland’s Learning Estate Strategy’ states that, ‘good
consultation about learning environments, direct engagement with learners and
communities about their needs and experiences, and an involvement in decision
making processes should lead to better outcomes for all’. 
5.2 Further to consultation with Head Teachers, it was decided to seek the views of 
children in P4-7 at the 4 directly affected primary schools.   
5.3 The children were asked to complete a form, using their online school accounts, to 
share their thoughts and views on the proposal.  The following questions were asked, 
which were developed by the collective group of Head Teachers: 
 New houses are being built beside Tesco and the Council would like these children to
go to St Anthony’s Primary School or Mayfield Primary School. Do you agree with
this? 
 Why have you answered yes or no to the question? 
5.4 A total of 56 responses were received from pupils across the 4 primary schools and the 
table below provides a breakdown of these:  
School Yes No
Glencairn Primary 6 10
Mayfield Primary 10 2
St Anthony's Primary 11 5
St John's Primary 1 11
Total 28 28 
5.5 The following sections outline the thoughts of the pupils from each primary school: 
5.5.1 Glencairn Primary School 
The majority of children asked at Glencairn Primary School were not in favour of the 
proposal.  They thought that people should be able to choose their own school and 
would like a wider group of friends to join their school.  Of those who agreed with the 
proposal, 6 out of 16, felt that children should attend the school closest to their home, 
as this was safer. 
48

Page 49

Page 8 of 10
5.5.2 Mayfield Primary School 
The majority of Mayfield Primary School participating in the online survey were in 
favour of the proposal, mainly because of the potential to make new friends.  Of the 2 
children who did not agree, one was worried about not knowing the new children and 
the second child believed there is not enough space at Mayfield Primary School. 
5.5.3 St Anthony’s Primary School 
The majority of children from St Anthony’s Primary School taking part in the online 
survey agreed with the proposal (11 of 16).  The children thought that attending the 
closest school to home is important and looked forward to making new friends.  Five 
children did not agree and felt that there was not enough space at St Anthony’s 
Primary School for more children and that other schools had a low number of pupils. 
5.5.4 St John’s Primary School 
Only one child at St John’s Primary School agreed with the proposal, with 11 against. 
All 12 children wanted to see the roll at St John’s Primary School increase. 
5.6 The main themes emerging from the children’s responses were as follows: 
 Making new friends 
 Going to the closest school
 Are the schools big enough for the extra children?
 Being able to choose their school
 Low pupil numbers at St John’s Primary School 
5.7 The Council welcomes all feedback, especially from our children and young people and 
have responded below: 
5.7.1 The key aim of this proposal is to provide children with a place at the primary school 
nearest their home, along with their neighbours.  The children would be able to walk a 
short distance to school.  The Council has looked at the likely numbers in detail and 
believes that Mayfield and St Anthony’s Primary Schools are large enough to include 
the children from the new homes.  Parents/carers will be able to choose their catchment 
school or make a placing request to the school of their choice, as can be done at 
present.  The Council notes the concerns from children, parents and staff at St John’s 
Primary School about the pupil numbers.  Leaving the catchment area as it is would 
only result in around 1 extra child per year for St John’s Primary School and would 
mean that children with a Saltcoats address would be catchment for a Stevenston 
primary school 1.8 miles away from where they live.  For this reason, the Council 
believes that the proposal to rezone all of the children to St Anthony’s and Mayfield 
Primary Schools is the right one for all children in the local area. 
6. EDUCATION SCOTLAND’S REPORT AND THE COUNCIL’S RESPONSE 
6.1 Education Scotland has a key role in considering the educational aspects of the 
proposal.  Their officer conducted meetings on 8 and 9 March to consult with parents/ 
carers, staff, young people and the Catholic Church representative on the educational 
aspects of the proposal.   
49

Page 50

Page 9 of 10
6.2 Copies of the Proposal Document, the full note of the public meeting held and all formal
responses to the proposal received were submitted to Education Scotland on 8 March
2023.  A representative from Education Scotland attended the public meeting held on
18 January. 
6.3 In accordance with the requirements of the Schools (Consultation) (Scotland) Act 2010,
a report was provided by Education Scotland in relation to the proposal.  This report
can be found at Appendix 3. 
6.4 Education Scotland Report Summary 
HM Inspectors are of the view that the proposal to change the catchment areas as
stated by the council is sufficient in terms of educational benefits. Although around
half of stakeholders who met with HM Inspectors are opposed to the proposals, HM
Inspectors are satisfied that the council have systems in place to carefully manage
school admissions to the schools impacted. The council do not foresee a situation
where school capacity is exceeded. Should the proposal be agreed the council will
need to work with stakeholders to manage any increase in traffic in affected school
areas.   
6.5  North Ayrshire Council welcomes the report by Education Scotland which highlights
and supports the identified educational benefits of the proposal.  Education Scotland’s
comments are detailed in their report, attached at Appendix 3. The Council has
considered these comments, both during and after the public consultation process and
can offer the following responses. 
6.6  Education Scotland’s comment: 
“The council does concede that there could be a possible negative impact on children
attending some of the schools in future, albeit not for a number of years.”  
6.6.1 The Council’s response: 
As outlined in Education Scotland’s report and at 4.9.2 above, this situation will be
closely monitored going forward, in order to manage numbers effectively.  The Council
do not foresee a situation whereby siblings, applying to schools by placing request,
would not be able to secure a place at Mayfield or St Anthony’s Primary School. 
6.7 Education Scotland’s comments: 
“Parents at St John’s Primary School are strongly against the proposals. Whilst
recognising the benefits to small class numbers currently at the school, they expressed
concern about the longer-term impact should numbers fall further.” 
“staff at St John’s Primary School expressed strong reservations. They believe a falling
school roll will be detrimental for their school community.” 
“children at St John’s Primary School are worried that the proposal might lead to 
reductions in staffing and resources should numbers attending the school fall 
significantly” 
6.7.1 The Council’s response:   
As outlined in Education Scotland’s report and at 4.9.3 above, the Council re-iterate
that this issue should be viewed within the wider context of a general decline in birth
rates and primary school pupil numbers. Whilst the proposed boundary amendment
50

Page 51

Page 10 of 10
may be seen as a loss of potential new pupils for Glencairn and St John’s Primary
Schools, the Council’s predictions estimate that there should be little impact on either
school.  Parents and carers will still be able to exercise their choice of school via the
existing placing request process. 
6.8 Education Scotland’s comments: 
“Parents from St Anthony’s and Mayfield Primary Schools also have reservations about 
the council’s proposals in terms of increasing class sizes.” 
“the lay member representing the Catholic Church in North Ayrshire who is in favour 
of the proposal”… “expressed some reservation regarding overcrowding of local 
schools in future, given that there are other housing developments in the area.” 
6.8.1 The Council’s response:
This issue was raised in the formal responses and at the public meeting.  The Council
operates class structures to the national legal limits, as detailed at 4.9.1, above.  Our
teachers are well-equipped to deliver education to classes of these sizes and children
are grouped as efficiently as possible for each new school session.  Roll projections
show that the space available within Mayfield and St Anthony’s Primary Schools can
sufficiently accommodate classes of these sizes.   
6.9 Education Scotland’s comment: 
St Anthony’s and Mayfield Primary Schools “experience issues with parents and carers 
parking directly outside the school gates, particularly at the end of the school day. 
Parents in both schools worry that traffic would only increase should the proposal go 
ahead.”
6.9.1 The Council’s response: 
Traffic around schools can be problematic and requires careful management.  the 
location of the new development should encourage children to walk to school. 
Mayfield Primary School is less than 0.5 miles and St Anthony’s Primary School is 0.7 
miles away. 
7. NEXT STEPS IN TERMS OF SECTION 15(4) OF THE SCHOOLS
(CONSULTATION)(SCOTLAND) ACT 2010 
7.1  In terms of the Schools (Consultation) (Scotland) Act 2010.  North Ayrshire Council will
take the final decision on whether to approve the proposal or not at its Cabinet meeting
to be held on 30 May 2023.   
8. CONCLUSION 
8.1 After reviewing and considering all responses, feedback from the public meeting and
Education Scotland’s report, North Ayrshire Council’s proposal to amend the primary
school catchment boundaries remains unchanged. 
8.2 If approved, it is proposed that this change would be effective from the next school 
session, 2024/25.
51

Page 52

1
COMMUNITIES AND EDUCATION DIRECTORATE
Proposal to amend the primary school catchment boundary,
directly affecting the following schools:
Mayfield Primary School
Glencairn Primary School
St Anthony’s Primary School
St John’s Primary School
REPORT BY HEAD OF SERVICE (EDUCATION) 
This document has been issued by North Ayrshire Council for consultation in terms of the
Schools (Consultation) (Scotland) Act 2010 
This document can also be made available in other formats and community languages.
Appendix 3
52

Page 53

2
North Ayrshire Council
Communities and Education Directorate
Catchment Boundary Amendment
Saltcoats and Stevenston
Table of Contents
1. Executive Summary
2. Strategic Context
3. Background and Rationale
4. Proposal
5. Educational Benefits Statement
6. Statutory Public Consultation Process
Appendices
1. Current Catchment Boundary Map
2. Proposal Timeline
3. Options Considered
4. Roll Projection
5. Mayfield Primary School P1 Intake Data 2018-2022
6. Proposed Catchment Boundary Map
7. Response Form
53

Page 54

3
1. Executive Summary
1.1 The Council approved a planning application to build up to 370 new homes 
at Mayfields, Saltcoats.  This will result in the construction of new homes across
the following primary school catchment boundaries:
 Mayfield Primary School
 Glencairn Primary School
 St Anthony’s Primary School
 St John’s Primary School
If the existing boundary lines are left unchanged, it would lead to a situation whereby
homes in the new development would fall within the catchment areas of Mayfield and
St Anthony’s primary schools, or Glencairn and St John’s primary schools, which are
further away.  Some of the new homes would be built across the catchment
boundary line.
1.2  Work has been undertaken to assess the impact of the new development on existing
school catchments and to examine any feasible options for change. The map at
Appendix 1 shows this in more detail.  Four options were considered as part of early
engagement with the local school communities:
 Do nothing
 Amend catchment boundary around the new homes
 Rezone 5 existing streets to Dykesmains Primary School
 Rezone all new homes to Mayfield Primary School - preferred
1.3 On Tuesday 29 November 2022, Cabinet (Education) approved a statutory public
consultation on the preferred option to rezone all of the new housing development to
Mayfield Primary School (non-denominational) and St Anthony’s Primary School
(denominational).
1.4 The consultation will commence on 9 January 2023 and close on 2 March 2023.   A
public meeting to discuss the proposal will be held at 6.30pm on Wednesday 18
January at Saltcoats Town Hall, 17-21 Countess Street, Saltcoats KA21 5HP.
1.5 Following the conclusion of this consultation, a report will be prepared for
consideration and approval by Cabinet in Spring 2023 (see timeline at Appendix
2).
2. Strategic Context
2.1 Council Vision
North Ayrshire Council’s Plan, ‘North Ayrshire: A Council that is Fair for All,’ sets out
our key aims and ambitions over the five-year period 2019-2024.  Our mission is
“working together to improve well-being, prosperity and equity in North Ayrshire”. 
54

Page 55

4 
Our Council:
 recognises there is strength in doing things together;
 engages with, listens to and supports communities to be active partners in what
we do;
 believes in fairness, tackles inequality and bases its decisions on these values;
 is ambitious, determined and committed to improving North Ayrshire;
 acts early taking a preventative approach;
 focuses resources towards our priority outcomes;
 innovates and drives positive change, embracing technology, to provide valued
and cost-effective services for our communities; and
 makes sure its voice is heard – locally, regionally, and nationally – to influence
decision making and to attract investment.  
Our priorities are centred on our people and places: 
Aspiring Communities
 active and strong communities
 children and young people experience the best start in life
 inclusive, growing and enterprising local economy
 people enjoy good life-long health and well-being
 people and communities are safe 
Inspiring Places
 effective infrastructure and digital connectivity
 affordable, modern, and well-designed homes that meet residents’ needs
 vibrant, welcoming, and attractive places
 a sustainable environment 
2.2      Education Vision 
North Ayrshire Council’s Communities and Education Directorate shares the Scottish
Government’s ambition of excellence and equity for all, underpinning the approach to
delivering Scottish education.  As stated in ‘Scotland’s Learning Estate Strategy:
Connecting People, Places and Learning’: 
“Improving the education and life chances of children and young people are key
priorities for both local and Scottish Government. Providing our children and young
people with the best possible start in life and ensuring that all learners reach their full
potential is critical.” 
Scottish Government’s 10 learning estate principles are key drivers in how we manage 
North Ayrshire Council’s Learning Estate.  By delivering on these principles, we can be 
confident in providing a sufficient, safe estate that is flexible, functional and future-proof. 
We continue to learn from the COVID-19 pandemic and the change it has affected in how 
we use our learning estate. 
A key priority of the North Ayrshire Council Plan is ensuring children and young 
people have the best start in life and that we have active and strong communities. 
This drives our place-based approach, set out in the Education Service Improvement 
Plan 2022-23, and informs how we provide safe, welcoming, nurturing and inspiring
55

Page 56

5 
environments.  We believe our learning environments promote achievement, 
wellbeing and enhance life chances. 
We want North Ayrshire’s children and young people to understand, feel part of and 
contribute to their community as this supports them to be the best they can be. We help 
this to happen through a locality-based approach to service delivery. 
This means providing the right services in the right areas to address the needs of the 
communities we serve. The learning estate is the Council’s most extensive asset and is 
a key pillar in supporting communities.   
Through Aspiring Communities, we seek to create a society where everyone has the 
same life chances to grow, prosper and have fulfilling and healthy lives.  Excellence and 
equity form the two key main aims in terms of educational outcomes. 
The vision is to continue to develop a motivational learning environment that supports
the delivery of positive educational outcomes for the children of North Ayrshire. 
2.3 Equality 
Promoting equality is one of North Ayrshire Council's core values. The principles of
equality and fairness are central to all council activities.  Equality means everyone is
treated fairly and has the opportunity to fulfil their potential. 
Under equality legislation, the general equality duty requires public authorities, in the
exercise of their functions, to have due regard to the need to: 
 eliminate unlawful discrimination, harassment and victimisation and other conduct
that is prohibited by the Equality Act 2010 
 advance equality of opportunity between people who share a relevant protected
characteristic and those who do not 
 foster good relations between people who share a protected characteristic and
those who do not 
The main method the council uses to ensure it is meeting its requirements under the
legislation is through the Equality Impact Assessment process, which is used to
assess policies, procedures and proposals.  Following the completion of an Equality
and Children’s Rights Impact Assessment (ECRIA), no adverse effects have been
identified as a result of the proposal.  This assessment is a live document, which will
evolve with the consultation and throughout the project, if approved. 
3  Background and Rationale 
3.1  In Autumn 2019, North Ayrshire Council’s Planning Committee approved an 
application from Persimmon Homes to build 275 units at Mayfield Farm (now known 
as ‘Mayfields’), over 3 phases.  An additional 95 units are planned to follow in Phase 
4, completing the site by 2033/34  (subject to a further planning application being 
submitted in the longer term). 
56

Page 57

6 
3.2  Work has now commenced on site with the first 18 units planned to be completed 
and sold by March 2023. 
3.3  Education and Planning Services noted in 2019 that the catchment boundary lines 
for the following primary schools ran through the proposed site: 
 Mayfield Primary School
 Glencairn Primary School 
 St Anthony’s Primary School
 St John’s Primary School 
If left unchanged, this would lead to a situation whereby homes in the new 
development would fall within the catchment areas of Mayfield and St Anthony’s 
Primary Schools, or Glencairn and St John’s Primary Schools, which are further 
away.  Some of the new homes would, in fact, be built across the catchment 
boundary line, leading to confusion for parents as to their catchment primary schools.   
3.4  Further work was undertaken to assess the impact of the new development on 
existing school catchments and to examine any feasible options for change. 
3.5  A map showing the current catchment boundary lines is attached at Appendix 1.  All 
of the new homes will have Saltcoats addresses and postcodes and the site entrance 
sits well within the Saltcoats town boundary.   
3.6  In order to review the impact of the site layout upon the current catchment primary 
school boundary lines, the following options were considered: 
 Do nothing
 Amend catchment boundary around the new homes
 Rezone 5 existing streets to Dykesmains Primary School
 Rezone all new homes to Mayfield Primary School - preferred 
The table at Appendix 3 outlines the advantages and disadvantages of each option. 
These have been presented and discussed with stakeholders as part of the early
engagement stage. 
3.7  The recommended option is to rezone all of the new homes to Mayfield Primary School,
for non-denominational education, and St Anthony’s Primary School for
denominational education. This option makes geographical sense and current pupil roll
projections (see Appendix 4) indicate that the schools can accommodate the
anticipated increase to pupil numbers as a result of the change.  The total number of
catchment homes for Mayfield Primary School, which would absorb the majority of the
additional pupil numbers, would rise in line with comparable sized non-denominational
primary school catchment sizes, such as Ardeer and Blacklands primary schools. 
3.8 This recommended option requires a Statutory Public Consultation under the Schools
Consultation Act 2010 and would affect the following primary schools, as the
catchment boundary for each school would change: 
57

Page 58

7 
 Mayfield Primary School, Saltcoats
 Glencairn Primary School, Stevenston
 St Anthony’s Primary School, Saltcoats
 St John’s Primary School, Stevenston 
3.9 The current roll at Mayfield Primary School is 186 pupils over 8 classes.  Less than
2/3 of these children live within the current Mayfield Primary School catchment, with
the remaining children living outwith the catchment area, attending the school as a
result of a successful placing request application.  The breakdown of the pupil roll
showing numbers of children registered for primary 1 (P1) who reside within the
catchment area and those outwith (placing requests) over the last 5 years is shown
in the table at Appendix 5. 
3.10 At its peak, the Mayfields housing development could contribute up to 12 children 
per year group to Mayfield Primary School, if all houses are zoned to its catchment. 
The average current catchment cohort per year group is 17 from the existing 761 
homes. 
3.11 Due to these maximum expected numbers and the number of placing requests into 
the school, it is recommended that the P1 intake for Mayfield Primary School is 
capped at 33 from August 2023.  This means that approximately 4 places would be 
left for placing requests, on average, each session.  This would limit the school roll to 
8 classes, giving catchment children a P1 place, before consideration of placing 
requests (as per the current school admissions policy). 
3.12 Whilst Mayfield Primary School was originally designed as a single stream (7-class)
school at its opening in 2004, the school has operated comfortably with an 8-class
structure in recent years. School roll projections indicate that Mayfield PS could cope
with the predicted level of additional pupils which the new development may
generate, and for this reason, it is recommended that Mayfield PS should be the non-
denominational catchment school for the Mayfields development. 
3.13 The second part of the proposal is to assign the new homes to St Anthony’s 
Primary School catchment, which would mean a maximum of 30 new pupils.  The 
pupil roll projection shows that the capacity of St Anthony’s Primary School can 
comfortably accommodate these potential new children. 
3.14 As noted at 3.7 above, the other schools directly affected by this proposal are
Glencairn and St John’s primary schools in Stevenston, with the potential reduction
of new pupils through the proposed rezone.  However, any parent/carer who wishes
their children to attend either of these schools can submit a placing request, as is
presently the case. 
3.15 Local early learning and Childcare (ELC) provision will be unaffected by this 
proposal.  Local provisions are as follows: 
58

Page 59

8 
 Glencairn PS Early Years’ Class open from 8am–6pm 48 weeks per year
 Mayfield PS Early Years’ Class open from 8.45am-4.30pm 38 weeks per year
 St John’s PS Early Years’ Class open from 8.45am-4.30pm 38 weeks per year
 Springvale Early Years Centre open from 8am-6pm 48 weeks per year 
Local private providers are: 
 Treetops Too Nursery, Saltcoats
 Bradshaw Early Years Centre, Saltcoats
 Busy Bees Nursery, Ardrossan 
3.16  Whilst statistically unlikely, there is a contingency plan in the event that pupil numbers 
exceed the maximum expected.  If Mayfield Primary  School grows beyond 8 
classes or St Anthony’s Primary School grows beyond 12 classes, the following 
short/medium term  options would be considered to create new classrooms: 
 Reconfiguration of the existing internal school spaces 
 The procurement of modular accommodation 
If the higher school roll was sustained over a number of years, then a longer-term 
solution would be considered.  An increase to the number of classrooms in a school 
would mean an increase in the number of staff required to operate the school. 
3.17 The issue, options and recommended approach were presented to Head Teachers 
and Local Elected Members earlier this year.  No further options were identified as a 
result of these meetings.  An online meeting then took place ahead of the Cabinet 
meeting held on 29 November 2022 to which the Head Teachers and representatives 
of the 4 primary school parent councils were invited.  Staff and parents/carers were 
also notified about the forthcoming proposal. 
4  Proposal 
4.1 In line with the Schools (Consultation) (Scotland) Act 2010, and as a result of 
engagement with relevant interested parties, North Ayrshire Council, 
proposes, from August 2023: 
(i) To amend the Mayfield Primary School catchment boundary line to include
the whole of the Mayfields housing development (see Appendices 1 and 6) 
(ii) To amend the St Anthony’s Primary School catchment boundary line to
include the whole of the Mayfields housing development (see Appendices 1
and 6) 
4.2 Should the proposal be approved, the P1 intake at Mayfield Primary School will be 
capped at 33 from August 2023, in order to ensure that there are sufficient places 
for catchment children in future years. 
59

Page 60

9
5 Educational Benefits Statement
5.1 Currently, the new housing site crosses the catchment for both Mayfield and
Glencairn Primary schools, as well as St Anthony's Primary and St John's Primary. 
The proposed change to the catchment boundary will provide children with a place 
at a school nearest to their home. 
5.2  All schools in the area will continue to maintain a viable and sustainable school roll 
with flexibility to support a variety of learning and teaching approaches, aligned to 
Curriculum for Excellence.  Teacher and staffing levels and year group
arrangements will continue to be effective, and children will be able to learn within
a variety of peer group opportunities, in a local context.
5.3 How will the proposal impact on future children?
Based on the development taking place over a ten-year period, the roll projection
shows that Mayfield and St Anthony’s Primary Schools will have capacity to
accommodate the expected increase in pupil numbers.
However, this means that it is likely there will be fewer spaces for placing requests
into both schools in future years.  For Mayfield Primary School in particular,
this could mean that, where a child attends the school by placing request, there
may not be an available space in later P1 intakes for their sibling(s).  This is
because P1 places will be allocated to catchment children first.  Once the new site
is established and new children register at Mayfield Primary School, (and St
Anthony’s Primary School) there are likely to be only a few spaces remaining for
allocation to placing requests.  In order to ensure that families who may be
affected receive this information, all early learning and childcare providers
will receive a link to this document and will be included as consultees in this
process.  It should be noted that it is likely to take some years for this effect to
be significant for families.  The numbers coming from the new development and
the resulting impact on the local schools will be closely monitored.
5.4 How does the authority intend to minimise or avoid adverse effects that may
arise from the proposal?
The proposed boundary amendment will potentially lead to the loss of new pupils for
Glencairn PS and St John’s PS from the new development, although parents/carers
will still be able to exercise choice via the existing placing request process.  
The proposed boundary amendment will result in an increase in pupil roll at both
Mayfield and St Anthony’s Primary Schools.  Should the proposal be approved, the
P1 intake at Mayfield Primary School will be capped at 33 from August 2023, in order
to ensure that there are sufficient places for catchment children in future years.  This
means that there could be fewer places for placing requests into Mayfield Primary
School in future years.
60

Page 61

10
5.5 Specific Benefits for the Children and Families
Children will experience education in their local setting affording the opportunities to
attend school with their peers from their neighbourhood. This builds continuity in
support of their education and social development. This approach also builds social
cohesion in the community living in the new housing areas. 
5.6 What is the community impact?
It is hoped that the new housing development will enhance the local community,
which currently has a declining birth rate. This will strengthen community and school
capacity to promote health, wellbeing and resilience. 
5.7 Are there any other effects of the proposal?
The main effect of amending the catchment boundary is the increase in catchment
children for Mayfield and St Anthony’s Primary schools and the resulting reduction of
spaces available for placing requests into both of these schools.
6. Statutory Public Consultation Process
6.1 This document has been issued by North Ayrshire Council for consultation in
accordance with the Schools (Consultation) (Scotland) Act 2010.
6.2 What is a Statutory Public Consultation?
In Scotland, local authorities have a statutory duty to ensure the adequate and
efficient provision of education in their area. If a local authority proposes to change
any part of the existing education provision in its area, then it must engage in a formal
consultation process under the Schools (Consultation) (Scotland) Act 2010.  The act
aims to ensure that all major changes which affect schools are subject to clear
consultation with parents, children, young people and communities.  
6.3 When does the Statutory Public Consultation start?
The consultation will start on Monday 9 January 2023 and close on Thursday 2 March
2023, which includes a period of 30 school days. 
6.4 Who will have access to this proposal document?
This proposal document has been made available to all interested parties, including
Parent Councils, Education Scotland, parents and carers of children attending all four
affected primary schools, Staff, Trade Unions and any other users of the
establishment as detailed in the distribution list. 
This proposal document is published on the Council website at -
http://northayrshire.community/category/consultations
61

Page 62

11
Copies are also available from the Communities and Education Directorate,
Cunninghame House, Irvine KA12 8EE (tel: 01294 324442), where this document will
be available from the main reception on the ground floor.
Copies can also be made available in alternative formats or in translated form for
readers whose first language is not English.  
6.5 What if I notice an error in the document?
If any inaccuracy or omission is discovered in this proposal document, either by the
Council or any person, the Council will determine if relevant information has been
omitted or if there has been an inaccuracy.   
The Council may then take appropriate action, which may include the issue of a
correction notice, the reissuing of the proposal document or the revision of the
timescale for the consultation period, if appropriate.  In that event, relevant consultees
and Education Scotland will be advised. 
6.6 How will I get a chance to give my opinion?
You will be able to give your opinion on the proposal:
 By completing an online response form at https://tinyurl.com/mv5m3x65
 By submitting a paper copy of the response form, attached at Appendix 7
 By emailing educ_consultation@north-ayrshire.gov.uk
 In writing to the Head of Service, Communities and Education Directorate, North
Ayrshire Council, Cunninghame House, Irvine, KA12 8EE
All responses must be submitted by no later than close of business on 2 March
2023.
6.7 Will there be any meetings for the public? 
A meeting for the public will be held at Saltcoats Town Hall, 17-21 Countess Street,
Saltcoats KA21 5HP on 18 January 2023 at 6.30pm.
This meeting will provide an opportunity to hear about the proposal from council
officers, ask questions and have their views recorded so that these can be taken into
account as part of the consultation process.  
Advance notice of specific  questions or issues to be raised at the meeting  will be
accepted.  This will allow all issues to be covered and give those who may not be
comfortable speaking publicly their opportunity to be heard.
Everyone wishing to attend will be made very welcome.
A note will be taken of comments, questions and officer responses at the session. 
The notes will be published on the Council website and a copy will be made available
on request. 
62

Page 63

12
The notes will also be forwarded to Education Scotland along with all other
submissions and comments that are received by the Council during the consultation
process. 
6.8 Will any other agencies be involved in the process?
The Schools (Consultation) (Scotland) Act 2010 requires that a report on the proposal
is prepared by Education Scotland, who may be in attendance at the information
session.
Once the statutory public consultation period comes to an end, Education Scotland
have three weeks to consider the educational aspects of the proposal and submit a
report to the council.  
Education Scotland receives copies of relevant papers from the council, including:
 a copy of the proposal paper;
 copies of the written representations or a summary of them (if Education Scotland
agree);
 a note of oral representations made at the public meeting sessions; and
 any other related documentation.
Education Scotland may visit schools and centres as part of their consideration of the
proposal and meet with children, staff and parents/carers who may be affected by the
proposal. 
Upon receipt of the proposal document and other relevant documentation, Education
Scotland will consider the educational aspects of the proposal.   They will ensure that
their report takes account of:  
 the educational benefits statement;
 the representations received by the council; and
 any further written representations made directly to Education Scotland on any
educational aspect of the proposal which is considered relevant.
The consultation report that the Council publishes following the statutory public
consultation must include the report from Education Scotland in full. 
6.9 Will the outcome of the consultation be made public?
The Head of Service will prepare a report on the outcome of the consultation process.
The report will take account of all Education Scotland recommendations. This report
will be published in electronic and printed formats and will be advertised in the
Ardrossan and Saltcoats Herald. It will be available on the Council website and at
Cunninghame House. 
The report will include:
 a record of the total number of written representations made during the
consultation period,
 a summary of the written and oral representations,
63

Page 64

13
 the Council’s response to recommendations made by Education Scotland
A copy of the Education Scotland report will be an appendix to the consultation report
which will be published and available for further consideration for a period of at least
3 weeks ahead of presentation to Elected Members in Spring 2023.  
6.10 When will the Council make a decision on the outcome of the consultation?
The consultation report, together with any other relevant documentation, will be
considered by Cabinet, who will make a decision on the proposal in Spring 2023.
6.11 What happens next?
If the proposal is approved by NAC Cabinet, the primary school catchment boundary
lines will be amended as proposed, from August 2023, with all homes in the new
Mayfields development being zoned to the catchment areas for Mayfield and St
Anthony’s Primary School.
64

Page 65

14
DISTRIBUTION
A copy of this document is available on the Community Planning Partnership pages within
the North Ayrshire Council website: 
http://northayrshire.community/category/consultations
A copy of this document will be made available to all stakeholders associated with the
schools directly affected by the proposal, including: 
 Parents/Carers and Parent Councils, including all local early years’
provisions
 Head Teachers
 Teaching and Non-Teaching Staff, including facilities management
 Local Elected Members
 Member of Parliament
 Member of Scottish Parliament
 Education Scotland
 Chief Executive, North Ayrshire Council
 All NAC Directors and Heads of Service
 Local Community Groups
 Care Inspectorate
 Trade Unions
 Unison
 EIS, Education Institute of Scotland
 NASUWT
 GMB
 UNITE
 Community
A copy of this Proposal Document is available to view at:
 All Saltcoats and Stevenston schools
 Saltcoats Town Hall and Saltcoats Library
 Stevenston Library
A public notice will appear in the Ardrossan and Saltcoats Herald from 4 January 2023.
65

Page 66

Reproduced from the Ordnance Survey map with the permission of the Controller
of Her Majesty's Stationery Office © Crown Copyright. Licence No. 100023393.
St Peter's PS
Catchment
St John's PS
Catchment
St Anthony's PS
Catchment
Non Denominational
Catchments
Mayfield Housing Site
KEY
Glencairn PS
Catchment Area
Mayfield PS
Catchment Area
Dykesmains PS
Catchment Area
Caledonia PS
Catchment Area
APPENDIX 1 - CURRENT CATCHMENTS &
NEW HOUSING DEVELOPMENT
66

Page 67

Appendix 2
Time
Required Dates Method / Action
June to August 2022 Engagement with Head Teachers and Local Elected Members
Tuesday 22 November 2022 Meet Parent Councils with Head Teachers via MS Teams
Tuesday 29 November 2022 Seek Cabinet approval to commence Statutory Public Consultation
Tuesday 6 December 2022 Inform Education Scotland of the proposal
Wednesday 4 January 2022 Public notice appears in Ardrossan and Saltcoats Herald
30 school
days
Monday 9 January to
Thursday 2 March 2023
Start of Consultation Period –
▪ Issue Proposal Document
▪ Public meeting at Saltcoats Town Hall on 18 January 2023 at 6.30pm
End of Consultation Period
3 weeks Wed 8 March to
Wed 29 March 2023
Provide Education Scotland with all responses received and a summary of these
Prepare Consultation Outcome Report
Prepare Cabinet paper
Receive report from Education Scotland
3 weeks Monday 17 April to 
Monday 8 May 2023 Publish Consultation Outcome Report
Week commencing 29 May 2023 Cabinet decision
67

Page 68

Appendix 3 – Options Considered
Options Considered Pros Cons Recommendation
1 Do Nothing  No SPC
 Some new homes and some streets
will be split between Saltcoats and
Stevenston schools.
X
2 Redraw catchment boundary
around new homes
 New children spread across
4 schools (not two)
 SPC required
 Children with Saltcoats addresses
will be zoned for Stevenston schools
X
3 Rezone five existing streets to
Dykesmains Primary School
 Makes Dykesmains/
Mayfield PS boundary line
neater
 SPC required
 Local opposition?
 Issues with siblings
 Secondary school zoning issue
X
4 Rezone all new homes to
Mayfield Primary School
 Makes geographical sense
 Total number of catchment
dwellings acceptable in
comparison with other NAC
single stream schools
 SPC required
 Recommend capping Mayfield PS P1
intake at 33 to limit placing
requests into Mayfield Primary
School
√
68

Page 69

Appendix 4 
Projected Numbers of Catchment Pupils 
Tesco Adjacent Areas
New Homes
Saltcoats North East Area   
46 units – former James Reid School site
370 units – new Mayfields site  761 existing homes      
Year  Projected
Housing
Unit
Completions
each year 
Projected number of primary aged pupils 
(new homes) 
Projected number of primary aged pupils 
(existing homes within 
Mayfield Primary School catchment area)
Denominational Non-denominational Denominational Non-denominational
2023 18 2 4 26 122
2024 36 5 12 30 124
2025 36 8 20 33 126
2026 36 10 29 37 127
2027 36 13 37 40 128
2028 36 15 46 36 126
2029 36 18 54 32 127
2030 36 22 62 37 128
2031 36 24 71 35 129
2032 36 26 80 38 128
2033 28 29 86 40 130 
Assumptions: 
➢ 0.31 pupils per new home 
➢ 75:25 non-denominational: denominational (current trend for Saltcoats)
69

Page 70

Appendix 5 
Mayfield Primary School
P1 Intake Data
2018-2022 
Year 2018/19 2019/20 2020/21 2021/22 2022/23
Number Registered 16 25 20 12 12
Placing Requests Out 3 5 4 1 0
Placing Requests In 14 12 10 10 18
Deferred Entries 1 1 1 3 0
P1 Intake 26 31 25 18 30
70

Page 71

Reproduced from the Ordnance Survey map with the permission of the Controller
of Her Majesty's Stationery Office © Crown Copyright. Licence No. 100023393.
St Peter's PS
Catchment
St John's PS
Catchment
St Anthony's PS
Catchment
Non Denominational
Catchments
Mayfield Housing Site
KEY
Glencairn PS
Catchment Area
Mayfield PS
Catchment Area
Dykesmains PS
Catchment Area
Caledonia PS
Catchment Area
APPENDIX 6 - PROPOSED CATCHMENTS &
NEW HOUSING DEVELOPMENT
71

Page 72

Appendix 7
Response Form 
Proposal to amend primary school catchment
boundary between Saltcoats and Stevenston 
Communities and Education Directorate 
Glencairn Primary School Parent/Carer  Staff  Pupil  Other 
Mayfield Primary School Parent/Carer  Staff  Pupil  Other 
St Anthony’s Primary School Parent/Carer  Staff  Pupil  Other 
St John’s Primary School Parent/Carer  Staff  Pupil  Other 
Other (please state) 
Question 
Yes 
No 
Please provide up to 3 reasons below for your response: 
1. 
2. 
3. 
Do you agree with the proposal to amend the catchment boundary in order to
rezone the Mayfields Persimmon housing development to Mayfield Primary
School and St Anthony’s Primary School? 
72

Page 73

Appendix 7
Please provide your contact details so that we can respond directly to you, if necessary.
Name: ………………………………………………...
Address: ………………………………………………...
…………………………………………….......
Email: …………………………………………………
Telephone: …………………………………………………
Date Completed: …………………………………………….
Responses should be received no later than 5pm on 2 March 2023.
Any responses received after this date cannot be considered.
Please contact 01294 324442 or email educ_consultation@north-ayrshire.gov.uk if you
require further information or assistance in the completion of this form.
North Ayrshire Council, in line with our Data Protection responsibilities will only use the personal
data provided for the sole purpose of evaluating your responses.  The response submitted by you
may form part of the response paper that will be submitted to the Council for consideration in the
near future and will therefore be made available for public inspection.  
Further information on how North Ayrshire Council manages your data can be found within our
privacy policy at the following website: www.north-ayrshire.gov.uk/privacy-policy.aspx
Should you wish any of your personal details (e.g. name, address, phone number, etc.), which you
have included in your response, to be included in our published responses it is necessary for us to
obtain your consent.  Please indicate this by ticking the box below.
Yes, I consent    
This document can also be made available in other formats and community
languages.
73

Page 74

North Ayrshire Council
Communities and Education Directorate
Proposal to amend the primary school catchment boundary,
directly affecting the following schools:
Mayfield Primary School
Glencairn Primary School
St Anthony’s Primary School
St John’s Primary School
Note of Public Meeting
Held at 6.30pm on Wednesday 18 January 2023 at Saltcoats Town Hall
NAC Attendees  Lynn Taylor, Senior Manager, Education
Communities and   Robin Knox, Manager (Infrastructure), Education
Education Directorate  Claire Reid, Project Officer, Education (note taker)
The meeting attendees were as follows:
 A parent
 NAC Councillor John Sweeney
 NAC Councillor Cameron Inglis
 Depute and Head Teacher, Mayfield Primary School
 Depute Head Teacher, St Anthony’s Primary School
 Education Scotland Observer
Lynn Taylor opened the meeting at 1831 hours and delivered a presentation,
highlighting the key information as follows:
1. The Proposal, in line with the Schools (Consultation) (Scotland) Act 2010:
(i) To amend the Mayfield Primary School catchment boundary line to include
the whole of the Mayfields housing development
(ii) To amend the St Anthony’s Primary School catchment boundary line to
include the whole of the Mayfields housing development
2. The Statutory Consultation Process
 Sets out the duty of local authorities to engage in formal consultation on
changes to education provision
 The act aims to ensure that all major changes which affect schools are subject
to clear consultation with parents, children, young people and communities
 Senior Managers, with Head Teachers are arranging consultation with P4-7
pupils at the 4 primary schools.
3. Current and Proposed Catchment Maps
4. Background, including expected pupil numbers from the development
Appendix 2
74

Page 75

5. Options Considered 
 Do Nothing
 Redraw catchment boundary around new homes
 Rezone existing streets to Dykesmains Primary School
 Rezone all new homes to Mayfield and St Anthony’s Primary School –
geographically the best option and school capacities deemed to be able to
accommodate the expected new children 
6. Implications for each of the 4 schools 
 There should be no negative impact on the 4 directly affected schools
 Placing requests will be carefully managed to minimise the impact on those
from outwith the 4 directly affected schools 
7. Context 
 Currently 761 homes within the Mayfield Primary School catchment, increasing
to 1175 by 2033 with this development
 This is comparable with other 6-8 class primary schools across North Ayrshire
(ranging from 964 to 1500 homes within their catchments)
 Saltcoats births have fallen from 148 in 2018 to 120 in 2022 
8. Educational Benefits 
 Provides children with a place at the primary school nearest their home
 Opportunity to attend local school along with neighbourhood peers
 Local social cohesion for the people of new community 
9. Proposal Timeline 
10. How to Share your Views 
 By completing an online response form at https://tinyurl.com/mv5m3x65
 By submitting a paper copy of the response form – copies made available at
the meeting
 By emailing educ_consultation@north-ayrshire.gov.uk
 In writing to the Head of Service, Communities and Education Directorate,
North Ayrshire Council, Cunninghame House, Irvine, KA12 8EE 
The consultation closes on Thursday 2 March 2023 at 5pm.
Throughout the presentation, the following questions were asked and answers given: 
Question 1:  Why are the current school boundary lines set up this way? 
Response: Catchment boundary lines are set out on maps and are historical
in nature.  These maps are used by Education to delineate all
school catchment areas. 
75

Page 76

Question 2:  What about the new homes being built on the James Reid school   
site?
Response:  These currently fall within the Mayfield and St Anthony’s Primary   
School catchment areas and have been included in our 
projections. 
Question 3: What stage of education are the 5 pupils projected from the first
phase of the new homes? 
Response: This is unknown at this stage and is  purely a projection based on 
likely numbers of pupils.We will gather data from Persimmon as
the development proceeds and homes are sold. 
Question 4:  What about placing requests and the impact on Dykesmains and   
Glencairn Primary Schools?  There is a need to consider local   
capacity over the next 10-12 years. 
Response:  Based on the development taking place over a ten-year period,   
the roll projection shows that Mayfield and St Anthony’s Primary   
Schools will have capacity to accommodate the expected 
increase in pupil numbers.  Once the new site is established and   
new children register at both schools, there are likely to be fewer   
spaces remaining for allocation to placing requests at Mayfield   
Primary School.  This situation will be closely monitored going   
forward in order to manage numbers effectively.  Dykesmains   
Primary School could see their roll rise as a result – as fewer   
placing requests are granted, children are likely to attend their   
catchment school.  There should be little to no impact on either   
Glencairn or St John’s Primary School as a result of this proposal. 
Question 5:  What is the current trend in the birth rate for Stevenston? 
Response:  Stevenston births fell from 119 to 109 from 2018-2022.  A further   
decrease to around 90 is expected this year. 
Question 6: The projected number of twelve expected children per year group
is quite high – does this mean that class sizes will increase in
Mayfield PS? 
Response:  Potentially yes, as the number of homes within the catchment   
area is increasing.  It is important to note that not all expected   
children from the new Persimmon homes will be new to the 
catchment area.  Families may move from a home within the   
existing catchment area. Class sizes are legally limited to 33 for   
P4-7, 30 for P2-3 and 25 for P1 and composite classes.  Children   
who are within the catchment area will take up school places first,   
with fewer places expected to be available for allocation to placing   
requests in the future. 
Question 7:  Is St Anthony’s Primary School a larger school than St John’s   
Primary? 
Response: Yes, St Anthony’s PS has 12 classrooms available and St John’s
PS has 7.  St John’s PS was previously a 14-class school,
76

Page 77

however, some of the building is now used for other purposes as
the roll has reduced over time. 
Question 8:  How does the proposal timeline impact on this year’s placing   
request process? 
Response:  Current processes are not affected – the number of spaces 
available for placing requests will be carefully assessed each   
year, taking into account roll projections, which will be closely   
monitored and updated on a regular basis.  
The following questions were asked at the end of the presentation: 
Question 9:  The proposal means that there will be more full capacity classes   
– what will the impact of this be on children’s education? 
Response:  Our teachers are well-equipped to deliver education to class sizes   
as outlined during the presentation and children are grouped as   
efficiently as  possible for each new school session.  The 
proposal means that there will be more catchment children in the   
school and fewer children attending by placing request, as a 
result. 
Question 10:  Will there be more Classroom Assistants to support teachers? 
Response:  The number of hours allocated to each school is calculated by a   
formula and increases in line with the school roll.   
Question 11:  Is there space within the schools for the additional children? 
Response: Primary school classroom capacity is calculated on a basis of
1.7m2 per child within each classroom.  An allocation is then
provided for the number of general purpose spaces.  On this
basis, the schools are appropriately sized for the projected
numbers. More information on this is available at the following
link:  
Determining primary school capacity: guidance for local authorities - gov.scot
(www.gov.scot) 
There were no further questions and the meeting was closed.
77

Page 78

Schools (Consultation) (Scotland) Act 2010
Report by Education Scotland addressing educational aspects of
the proposal by North Ayrshire Council to amend the primary school
catchment boundary for Mayfield, Glencairn, St John’s and St
Anthony’s Primary Schools
March 2023
Appendix 3
78

Page 79

1   | Schools (Consultation) (Scotland) Act 2010 
North Ayrshire Council © Crown Copyright
1. Introduction 
1.1 This report from Education Scotland has been prepared by His Majesty’s Inspectors of
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of North Ayrshire Council’s proposal to amend primary school catchment boundaries
for Mayfield, Glencairn, St John’s and St Anthony’s Primary Schools. Section 2 of the report sets
out brief details of the consultation process. Section 3 of the report sets out HM Inspectors’
consideration of the educational aspects of the proposal, including significant views expressed by
consultees. Section 4 summarises HM Inspectors’ overall view of the proposal. Upon receipt of
this report, the Act requires the council to consider it and then prepare its final consultation report.
The council’s final consultation report should include this report and must contain an explanation
of how, in finalising the proposal, it has reviewed the initial proposal, including a summary of points
raised during the consultation process and the council’s response to them. The council has to
publish its final consultation report three weeks before it takes its final decision 
1.2 HM Inspectors considered:
• the likely effects of the proposal for children and young people of the schools; any other
users; children likely to become pupils within two years of the date of publication of the
proposal paper.
• any other likely effects of the proposal;
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and
• the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs. 
1.3 In preparing this report, HM Inspectors undertook the following activities:
• attendance at the public meeting held on 18 January 2023 in connection with the council’s
proposals;
• consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others;
• visits to the site of Mayfield, Glencairn, St John’s and St Anthony’s Primary Schools,
including discussion with relevant consultees; and
• engagement with the Diocesan Representative for North Ayrshire 
2. Consultation process 
2.1 North Ayrshire Council undertook the consultation on its proposal(s) with reference to the
Schools (Consultation) (Scotland) Act 2010. 
2.2 The consultation ran from 9 January until 2 March 2023. A public meeting took place in
Saltcoats Town Hall on Wednesday 18 January 2023. Two elected members, one parent,
two head teachers, one depute head teacher and representatives from North Ayrshire Council
attended the meeting. Members of the public were encouraged to respond to the consultation
through the online survey, by phone or in writing. Twenty-five written responses were submitted to
the council. Almost all disagree with the council’s proposals although almost half of these were
from staff from St John’s primary who had particular concerns about the impact of the proposal.
79

Page 80

2   | Schools (Consultation) (Scotland) Act 2010 
North Ayrshire Council © Crown Copyright
Early engagement by the council took place in the form of meetings with head teachers in June
2022, with follow up discussions and a meeting with Parent Council chairpersons in August. No
enquiries for clarification or further information were received by the council. 
3. Educational aspects of proposal 
3.1 In relation to the proposed new housing development, the council outlines what it believes
are the educational benefits for children and their families. The council believe that the most
important benefit is to provide children with a place at the primary school nearest their home,
along with their neighbourhood peers. They also state that all schools in the area will be able to
maintain a viable and sustainable school roll with flexibility to support a variety of learning and
teaching approaches. Numbers will be carefully managed each year at primary one admission and
throughout each session. The council does concede that there could be a possible negative
impact on children attending some of the schools in future, albeit not for a number of years.
However, they do not foresee a situation whereby siblings would not be able to secure a place at
Mayfield or St Anthony’s Primary School. 
3.2  Around half of stakeholders who spoke to HM Inspectors are not in favour of the proposal.
Many parents are concerned about increasing class numbers and the potential negative impact
that this may have on their child’s learning although none of the existing schools are at capacity.
Parents at St John’s Primary School are strongly against the proposals. Whilst recognising the
benefits to small class numbers currently at the school, they expressed concern about the
longer-term impact should numbers fall further. Parents from St Anthony’s and Mayfield Primary
Schools also have reservations about the council’s proposals in terms of increasing class sizes.
Both schools experience issues with parents and carers parking directly outside the school gates,
particularly at the end of the school day. Parents in both schools worry that traffic would only
increase should the proposal go ahead. The council accepts that traffic issues are a problem and
requires careful management. However, the location of the new development should encourage
children to walk to school. Mayfield Primary School is less than 0.5 miles and St Anthony’s
Primary School is 0.7 miles away. 
3.3 Children who spoke with HM Inspectors have mixed views about the proposal. A few
welcome being able to make new friends should school rolls increase. Across the four schools,
children recognise the potential benefits for health and the environment if more children walk to
school. However, children at St John’s Primary School are worried that the proposal might lead to
reductions in staffing and resources should numbers attending the school fall significantly. 
3.4 Although most school staff who met with HM Inspectors identified benefits from the
proposal in terms of children attending their nearest school, staff at St John’s Primary School
expressed strong reservations. They believe a falling school roll will be detrimental for their school
community. However, the council contends that the issue needs to be set in the wider context of a
general decline in birth rates and primary school pupil numbers. Whilst the proposed boundary
amendment can be viewed as a loss of potential new pupils for Glencairn and St John’s Primary
Schools, the council’s predictions estimate that there should be little impact on either school.
Parents and carers will still be able to exercise their choice of school via the existing placing
request process. 
3.5 HM Inspectors met with the lay member representing the Catholic Church in North Ayrshire
who is in favour of the proposal. Their reasons include that Catholic children from the new housing
could travel more easily to St Anthony’s Primary School as it was closer than St John’s Primary
School. If the boundary remains as it is, it may cause confusion for families given that all the new
houses would all have a Saltcoats postcode. They expressed some reservation regarding
80

Page 81

3   | Schools (Consultation) (Scotland) Act 2010 
North Ayrshire Council © Crown Copyright
overcrowding of local schools in future, given that there are other housing developments in the
area. 
4. Summary 
HM Inspectors are of the view that the proposal to change the catchment areas as stated by the
council is sufficient in terms of educational benefits. Although around half of stakeholders who met
with HM Inspectors are opposed to the proposals, HM Inspectors are satisfied that the council
have systems in place to carefully manage school admissions to the schools impacted. The
council do not foresee a situation where school capacity is exceeded. Should the proposal be
agreed the council will need to work with stakeholders to manage any increase in traffic in affected
school areas.   
HM Inspectors
March 2023 
81

Page 82

82

Page 83

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Equality Mainstreaming Report 2020-22 and Outcomes
2021-2025 Mid-Term Report 
Purpose:  To present the Equality Mainstreaming Report 2020-22 and
Outcomes 2021-2025 Mid-Term Report (encompassing the
Education Authority) Mid-Term Report. 
Recommendation:  Cabinet is asked to:
a)  Approve the content of Equality Mainstreaming Report
2020-22 and Outcomes 2021-2025 Mid-Term Report; and b)
Approve publishing of the report on the Council’s website
as required under the Equality Act 2010. 
1. Executive Summary 
1.1 Under the Equality Act, from April 2013, public sector organisations are required to
publish equality information once every two years and consult on and develop Equality
Outcomes once every four years. Our last main report was published in 2021 and
included updated Equality Outcomes covering the period 2021 – 2025.  The report
attached at Appendix 1 is our mid-term report (2023).  It includes information covering
the calendar years 2021 and 2022. 
1.2 The report highlights key areas of equality work that have been mainstreamed through
Council processes and also an update on the actions supporting specific equality
outcomes. Our Education Service is also required to produce a report as per the
legislation and this has been embedded within the main report.   
1.3  The Equality Act also requires the Council to produce statistics on the protected
characteristics of our employees.  These have been summarised from page 19 in the
Equality Mainstreaming report with a link to more detail at the end of the report.  
Agenda Item 6
83

Page 84

2. Background 
2.1 The Equality Act 2010 (The Act) sets out a general duty for every public authority, often
referred to as the three needs, which requires organisations to: 
• Eliminate unlawful discrimination, harassment and victimisation.
• Advance equality of opportunity between people who share a relevant protected
characteristic and those who do not.
• Foster good relations between people who share protected characteristics and
those who do not. 
2.2 The public sector duty covers a number of ‘characteristics’, these are known as
protected characteristics and are:  Age; Sex; Gender Reassignment; Pregnancy and
Maternity; Race; Religion or Belief; Sexual Orientation; Marriage and Civil
Partnerships (although this last category only applies to eliminating discrimination). 
2.3 Additional ‘Specific Duties’ were added in 2012 (in Scotland) to help authorities meet
the three needs outlined in the general duty.  These include: 
• Report on mainstreaming equality duty.
• Publish equality outcomes and report progress.
• Assess and review policies and practices.
• Gather and use employee information.
• Publish gender pay gap information. 
2.4 Education bodies are listed as separate authorities within the equality legislation,
however, to support simplicity and to reflect our collaborative working approaches, the
Education Mainstreaming and Outcomes report is contained within the overall report. 
2.5 The Licensing Board is also included in the list of organisations required to publish
equality reports and we have included a link to their report. 
Mainstreaming Equality Key highlights 
2.6 Listed below are some of the key highlights from our mainstreaming and outcomes
report: 
• Introduction of a British Sign Language video landing page on the Council’s external
website
• The creation of a Black and Minority Ethnic (BAME), pan-Ayrshire employee forum.
• New guidance on Menopause in the Workplace. 
• Introduction of an online Equality and Children’s Rights Impact Assessment training
module. 
• Gold re-accreditation of the Social Housing Charter, which includes recognition of our
inclusive approach to engaging with North Ayrshire residents.
• An increase in the number of Gold accreditations from four to 10 schools for the Rights
Respecting Schools awards. 
84

Page 85

• A key partner in the successful implementation of the Pan-Ayrshire Hate Crime
Awareness conference delivered in October 2022.
• Improvements in our data collection for our employee statistics.
• Our overall mean Gender Pay gap has reduced to 0.22% (from 1.19% in 2021).
• Successful implementation and delivery of the Equal Supported Employment
programme, supporting young people with learning disabilities into work experience in
horticultural skills and qualifications.
• Almost 90% of Additional Support Needs and young carers have their voice heard,
helping to realise Article 12 of the United Nations Charter on the Rights of the Child
(UNCRC) – ‘Respect for the views of the child’, in our last report in 2021, this figure was
75%.
• Connected Communities successful achievement of the Silver LGBT Charter Mark. 
• Introduction of the See Me CV into the application process for Modern Apprenticeships. 
• Our Webteam are actively working to ensure our website and all documents contained
within it are accessible.  This includes significant support to services such as training
and the creation of ‘How To’ guides. 
2.7 Though not included in the main report as outside of its timescales, our Council
continues to promote equality.  Since January 2023 key highlights include: 
• Improvement from a Disability Confident Level 2 organisation to a Disability Confident
Leader.
• Progression from a Carer Positive Employer – ‘Established’ to Carer Positive
‘Exemplary level’.
• We have introduced our Gambling Related Harm Workplace Charter. 
Equality Outcomes Overview
2.8   In 2020, as part of the review of the Equality Outcomes, public sector partners across
Ayrshire came together to develop and consult on Equality Outcomes for 2021-2025. 
These partners included the three Ayrshire Councils, the three Health and Social Care
Partnerships, NHS Ayrshire and Arran, Ayrshire College, Ayrshire Valuation Joint Board
and the Community Justice Authority. The partners were able to pool resources to
support engagement around the development of equality outcomes and actions. 
2.9   It was agreed that the four original overarching Equality Outcomes developed in 2016
would be carried forward to the 2021-2025 reporting cycle. In addition, following advice
from the Equality and Human Rights Commission, specific sub-outcomes were included
to sit beneath the overarching outcomes, the four outcomes are: 
• In Ayrshire, people experience safe and inclusive communities.
• In Ayrshire, people have equal opportunity to access and shape our public services.
• In Ayrshire, people have opportunities to fulfil their potential throughout life.
• In Ayrshire, public bodies will be inclusive and diverse employers. 
2.10 The Sub-outcomes and supporting actions can be found in the Equality Outcome section
of the main report.   
85

Page 86

3. Proposals 
3.1 Cabinet is asked to:  a) Approve the content of Equality Mainstreaming Report 2020-22
and Outcomes 2021-2025 Mid-Term Report; and b) Approve publishing of the report on
the Council’s website as required under the Equality Act 2010. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None 
Human Resources 
4.2 None 
Legal 
4.3 The Council has a legal obligation to publish an Equality Mainstreaming and Outcomes
report as part of the Equality Act (2010) and subsequent legislation.   
Equality/Socio-economic 
4.4 The report highlights key areas of work across the Council that support and promote
equality and diversity in support of the Equality Act 2010 (The Act) and subsequent
legislation.   
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 Our aim is to create a North Ayrshire that is ‘fair for all’.  As such, equalities
mainstreaming and outcomes directly contribute to all of our priorities within our Council
Plan. 
Community Wealth Building 
4.7 None 
5. Consultation 
5.1 The Corporate Equality Group were consulted on the content of the report.
5.2 Services and partners were in engaged in supporting input into the content of the report. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Andrew Hale, Health Improvement and Equalities
Officer, on andrewhale@north-ayrshire.gov.uk. 
Background Papers
None
86

Page 87

Equality Mainstreaming Report 2021-22 and
Outcomes 2021 – 2025 Mid Term Report (2023)
87

Page 88

Welcome .................................................................................................................................................................... 1
About North Ayrshire .................................................................................................................................................... 1
Accessibility and Further Information........................................................................................................................... 1
Mainstreaming Equality and Outcomes Key Highlights 2021-22.................................................................................. 2
Key Highlights ............................................................................................................................................................. 2
Context ....................................................................................................................................................................... 3
Key Strategies ............................................................................................................................................................. 3
Employee Statistics Overview .................................................................................................................................... 19
Disability ...................................................................................................................................................................... 19
Ethnicity....................................................................................................................................................................... 19
Age .............................................................................................................................................................................. 20
Sex ............................................................................................................................................................................... 20
Sexual Orientation ....................................................................................................................................................... 21
Religion or Belief (including no belief) ........................................................................................................................ 21
Further Considerations ............................................................................................................................................... 22
Employee Pay Gap Information .................................................................................................................................. 22
Occupational Segregation Information ....................................................................................................................... 23
Equality Outcomes .................................................................................................................................................... 25
Ayrshire Shared Equality Outcomes ............................................................................................................................ 25
Equality Outcome 1 – In Ayrshire people experience safe and inclusive communities ............................................. 26
Equality Outcome 2 – In Ayrshire, people have equal opportunity to access and shape our public services - Ayrshire
Shared Actions ............................................................................................................................................................ 27
Equality Outcome 3 - In Ayrshire, people have opportunities to fulfil their potential throughout life ...................... 27
Equality Outcome 4 – In Ayrshire public bodies will be inclusive and diverse employers ......................................... 34
Contents
88

Page 89

Page 1 of 37
Fairness and tackling inequality sit at the heart of our Council Plan 2019-24.  Our vision is “A
North Ayrshire that is ‘Fair for All’”.  This is supported by our mission “Working together to
improve well-being, prosperity and equity in North Ayrshire”.
This mainstreaming report highlights the key strategies and areas of work that are helping to
embed equality and diversity within our services.  
It shows how we are meeting the requirements of the Equality Act 2010 and subsequent amendments to this
legislation.  Since 2013, all public bodies have been required to produce a report every two years covering a number
of Equality related activities, which are referred to under the Public Sector Equality Duty.  This report is our Mid-Term
report for Mainstreaming and Equality Outcomes for the period 2021-2025 and covers information from January 2021
to December 2022.  This includes:
• Employee statistics relating to protected characteristics.
• The Education Mainstreaming Report.
• Link to the Licensing Board Equality Mainstreaming Report.
• A progress report on the implementation of the Ayrshire Shared Equality Outcomes and actions.
This report is the mid-way point through our four-year Equality Outcome reporting cycle. 
The Public Sector Equality Duty ‘specific duties’ stipulate the requirements of reporting.  The key elements are,
mainstreaming the equality duty, publishing and reporting on equality outcomes and gathering and publishing
employee statistics.
About North Ayrshire
North Ayrshire is on the southwest coast of Scotland and one of 32 Local Authority areas in Scotland.  It covers 885
square kilometres, encompasses the Islands of Arran and the Cumbraes and has a population of just over 134,000
people (ONS June 2021).  Demographically, North Ayrshire continues to be faced with a number of challenges.  33%
of our 186 Scottish Index of Multiple Deprivation (SIMD) zones are in the bottom 15% for income, 30% are in the
bottom 15% for employment, 27% for health and 17% in the education domain.  The percentage of children living in
poverty after housing costs is estimated at 24.7% for 2020/21, however this figure is heavily caveated due to how
information was gathered during the Covid-19 pandemic and may be higher (it was 27.9% in 2019/20).
It is recognised that people with certain protected characteristics as identified within the Equality Act are more likely
to experience inequality.  These can include people with a disability, single parent families - especially where the parent
is female, and certain ethnic groups.
Accessibility and Further Information
We are constantly striving to make our Council and our reports as accessible as possible.  We welcome opportunities
to discuss how this can be achieved.  This report has been access checked using the ‘Assist’ accessibility checker.
Corporate Equalities is part of the Corporate Policy, Performance and Elections Team.  For further information or to
discuss any aspect of the contents of this report please contact: 
The Corporate Policy, Performance and Elections Team
Tel: 01294 310000 
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
Welcome
89

Page 90

Page 2 of 37
Mainstreaming Equality and Outcomes Key Highlights 2021-22
• Introduction of a British Sign Language video landing page on the Council’s external website.
• The creation of a Black and Minority Ethnic (BAME), pan-Ayrshire employee forum.
• New guidance on Menopause in the Workplace.
• Introduction of an online Equality and Children’s Rights Impact assessment training module.
• Gold re-accreditation of the Social Housing Charter, which includes recognition of our inclusive approach to
engaging with North Ayrshire citizens.
• An increase in the number of Gold accreditations from four to 10 schools for the Rights Respecting Schools
awards.
• A key partner in the successful implementation of the Pan-Ayrshire Hate Crime Awareness conference
delivered in October 2022.
• Improvements in our data collection for our employee statistics.
• Our overall mean Gender Pay gap has reduced to 0.22% (from 1.19% in 2021).
• 514 unemployed individuals supported through the Ayrshire Growth Deal ‘Working for Healthier Economy’
programme, including supporting 51 people into employment.
• Successful implementation and delivery of the Equal Supported Employment programme, supporting young
people with learning disabilities with work experience in horticultural skills and qualifications.
• Almost 90% of Additional Support Needs and young carers have their ‘voice’ heard, helping to realise Article
12 of the UNCRC – Respect for the views of the child, an increase from 75% since our 2021 report.
• Connected Communities successful achievement of the Silver LGBT Charter Mark.
• Introduction of the See Me CV into the application process for Modern Apprenticeships.
• Our Webteam are actively working to ensure our website and all documents contained within it are
accessible. This includes significant support to services such as training and the creation of 'How To' guides.
Key Highlights
90

Page 91

Page 3 of 37
The Equality Act  
Under the Equality Act 2010, the Public Sector Equality duty, or ‘general equality duty’, requires public authorities in
the exercise of their functions to have due regard to the need to: 
• Eliminate unlawful discrimination, harassment and victimisation and other conduct that is prohibited by the
Equality Act 2010.  
• Advance equality of opportunity between people who share a relevant protected characteristic and those who
do not.  
• Foster good relations between people who share a protected characteristic and those who do not.   
These elements of the Act are also referred to as the three key needs of the Act.  Additional information in relation
to equalities issues in North Ayrshire is available on our website: This includes Equality Impact Assessments and the
Equality Outcomes for 2021 – 2025. 
Key Strategies
Our Council Plan
Our Council Plan is the main strategic plan for our Council.  It is high level and has tackling
inequality at its core with our vision being “A North Ayrshire that is ‘Fair for All’”.  All of our
plans must align to the Council Plan, meaning tackling the causes of inequality are embedded
throughout our services.
The Community Wealth Building Strategy
The Community Wealth Building Strategy, the first of its kind in Scotland, was launched in June
2020 and is already a key driver within our Council Plan.  It will ensure we use the economic
levers available to us to generate an inclusive greener economy with better jobs for more of
our residents.  Click the image for more details.  
One of the key objectives within the strategy is to build ‘Fair Employment’ by encouraging the
creation of fair and meaningful jobs, with progression opportunities.  One of the main projects
supporting this is the Equal Supported Employment programme (please see our equality outcome section).  For more
information please our Community Wealth Building page.  
Children’s Services Plans
Our Children’s Services Planning includes our Children’s Services Plan and Children’s Rights Report
which cover the next three years.  We also include our annual Local Child Poverty Action Plan and
Report within our suite of plans.  
Our Children’s Services Plan 2020-23, outlines our aims and priorities to safeguard, support and
promote the wellbeing of children and to make North Ayrshire the best place in Scotland to grow
up.
Our Children’s Rights Report 2020-23 emphasises our commitment to
promote and protect children and young people’s rights in line with the
United Nations Convention on the Rights of the Child (UNCRC).  
Our Child Poverty Action Plan 2022-23 recognises the life-long impact growing
up in poverty can have on the life chances of our children and young people. 
The Child Poverty (Scotland) Act 2017 sets out four income-based targets to
Context
91

Page 92

Page 4 of 37
Context
reduce child poverty in Scotland by 2030.  The key drivers of child poverty have been identified as – ‘income from
employment’, ‘income from social security and benefits in kind’ and the ‘cost of living’.  
Ayrshire Growth Deal
The Ayrshire Growth Deal sees approximately £251 million of funding from the Scottish and UK Governments being
invested across North, South and East Ayrshire.  
The Ayrshire Growth Deal programme has a strong focus on inequality and inclusivity and through the award winning
‘Ayrshire Inclusive Growth Diagnostic’ tool has identified a number of key target groups for our employability
programmes.  These groups include, females, young people and those with disabilities and long-term health
conditions.  The implementation of the various projects within the Growth Deal programme should bring lasting and
long-term benefits to people in these equality groups and many others across North, South and East Ayrshire.  We
have embedded actions for the Ayrshire Growth Deal within our Equality Outcomes and although these will take some
time to realise, they help to ensure a continued focus on equality
groups within the Ayrshire Growth Deal programmes.  ‘Working for
a Healthy Economy’ is one of the key programmes within the Ayrshire
Growth deal that has a strong focus on inequality and supporting
people both into and to sustain employment, with support and input
from the SALUS occupational health service.  Further information is
covered within out Equality Outcome section.
Please click on the image to the left to access the AGD site or click
here.
British Sign Language Plan
Our Ayrshire Shared British Sign Language (BSL) plan 2018-2024, along with the mid-term report October 2021 can be
found in our British Sign Language Plan page on the Council’s main website.  Since the plan was introduced, the
partners have been engaging with the local BSL and deaf community to support the implementation of the plan. 
Partners recently attended the Ayrshire Deaf Society in Kilmarnock with plans to provide more regular visits during
2023, inviting a range of Council and NHS services to update the society on their work.  
Since our last mainstreaming report published in 2021, we have continued to provide training in BSL and resources
where appropriate.  Two additional smart phones were provided to the Council’s Sensory Impairment team to enhance
engagement with the local BSL community.  These, along with the two phones provided in 2020, enable the team to
provide effective support services through enhanced communication methods.  
Two six-week introductory programmes in BSL were provided across our Council with one of the courses specifically
focused on staff within educational settings.  These sessions focused on the basics of learning BSL and will be followed
up in 2023 with more in-depth sessions.  
In addition to our BSL landing page, we have also created some short videos in BSL on how to access Council Services,
the videos include – Bin Collection Day, School Term Dates, Pay Your Council Tax, Find a Recycling Centre and Contact
Us.  The videos were produced based on the key searches or ‘hits’ on our Council’s main website and will be used to
further engage with the BSL community on future topics of interest.  The videos can be found here. 
92

Page 93

Page 5 of 37
Mainstreaming the Equality Duty
This section focuses on mainstreaming equality within the Council, highlighting information
on a range of processes, including equality impact assessments, training, Human Resource
policies and procedures as well as our equality groups.  
Equality and Children’s Rights Impact Assessments
The Equality Impact Assessment (EQIA) process continues to be a key tool that helps our services consider equality
and diversity related issues within their service planning and activities.  This process helps to raise awareness of and
eliminate potential discrimination.  It also highlights and advances equality of opportunity by making stronger links
between equality groups and issues.  
We engage with our communities around impact assessments as well as accessing information on the Scottish
Government Equality Evidence Finder.   This tool makes it easier for people to locate and access equalities information
and provides a wealth of data and other evidence with accompanying commentary, background papers and links to
further information.   Summaries of our full Equality and Children’s Rights Impact Assessments are published on our
Equality Policy and Performance page. During 2023 we will be carrying out a full review of the Equality and Children’s
Rights Impact Assessment tool. 
Our impact assessment process contains several areas:
Protected Characteristics
The impact on any of the nine protected characteristics of age, sex, race, disability, sexual orientation,
religion and belief, gender reassignment, pregnancy and maternity and marriage and civil partnership.
Children’s Rights and Human Rights
The Children and Young People (Scotland) Act 2014 (Duties of public authorities in relation to
the UNCRC) requires public authorities (including all local authorities and health boards) to report on
the steps they have taken to secure or further implement the requirements of the United Nations
Convention on the Rights of the Child (UNCRC).  As a result, Children Rights were added as an
integral part of the Equality Impact Assessment process during 2018 and aligned to the eight
indicators from the Getting It Right For Every Child (GIRFEC) programme.  
Fairer Scotland Duty
This Duty, introduced in 2018, places a legal requirement on certain public organisations to consider
the socio-economic impact of their policies, procedures and proposals on inequalities of outcome.  It
is part of the Equality Act.  Equality and socio-economic processes are built into our Committee
reporting procedure.  
Island Proofing
Section 8 of the Islands (Scotland) Act 2018 requires relevant public authorities (which includes local
authorities) to carry out impact assessments on island communities when creating a strategy, policy
or a service.   
93

Page 94

Mainstreaming the Equality Duty
Equality Groups
Corporate Equality Group
Our Corporate Equality Group includes Elected Members from each of the main political parties in the Council as
well as representatives from all our services.  This group meets quarterly to consider a range of equality and
diversity related issues, including Equality Mainstreaming and Equality Outcomes and actions.  Our Council is
also well represented on the Ayrshire Equality Partnership, which consists of a range of our public sector partners
including the NHS, South and East Ayrshire Councils, North, South and East Health and Social Care Partnerships,
Ayrshire College, Police Scotland, Scottish Fire and Rescue Service, Ayrshire Valuation Joint Board and Community
Justice Ayrshire.  
Employee Disability Forum
Established in 2019 to consider employee disability related issues in the organisation, the forum includes employees
who have a particular interest in disability issues, whether direct experience of a disability or whose role relates to
this area.  Representatives attend from Human Resources, Trade Unions, the Supported Employment Team
and the Sensory Impairment Team.  Some of the groups’ key successes include: Providing a safe space for
employees to raise issues relating to disability at work, supporting and providing input into HR related
policies and procedures, including workplace disability guide, the See Me CV initiative (see HR update
below), Disability Confident Employer, raising the profile of ICT related issues and seeking enhancements to
the fire evacuation procedure following the return to the physical workspace post COVID 19 pandemic.
Black and Minority Ethnic Employee Forum
Following recommendations from the Scottish Government’s report on Race Equality, Employment and Skills:
Making Progress Report, our Council adopted some of these recommendations and actions into our Equality
Outcomes.  The three Ayrshire local authorities have created a Pan Ayrshire Black and Minority Ethnic Employee
Forum.  The group first met in June 2022, with 12 participants.  They will explore issues and support mechanisms
for employees from a BAME background.  
Human Resources
Menopause in the Workplace
Our Council has an in-house HR Guide: ‘Menopause in the Workplace’ to support employees and raise awareness
about the menopause.   Menopause sessions for employees were delivered to provide further awareness and an
understanding of menopause, how it may impact their work and explore appropriate coping strategies.  In addition,
further resources from The International Menopause Society were shared during World Menopause Day providing
further information on specific menopause symptoms.
Page 6 of 37
94

Page 95

Page 7 of 37
Mainstreaming the Equality Duty
Carer's Leave Scheme
Our Carer’s Leave Scheme continues to be available to all employees and complements other provisions currently in
place.  As part of the scheme, our Council aims to provide employees with support by giving a range of options,
including a period of Carer’s Leave of up to 12 weeks.  To continuously review our supports and whether these are
effective, every 18 months a Carer’s Leave Survey is issued to all employees to evaluate their experience and help
identify improvements where possible.
Equality       Related Training
Our Council provides a range of Equality and Diversity related training, most of which is delivered via online
platforms.  Our figures show an increase in completions of our generic equality training following the update
and re-release of this module during 2021 (see tables below).  This course forms part of the mandatory suite of
courses as we continue to promote awareness.  As all employees can now access our ilearn learning online
learning suite we will carry out further promotion with our manual employees in 2023.
In the latter part of 2022, we introduced a new online learning module called ‘Equality and Children’s
Rights Impact Assessment’.  This module is aimed at employees who might have to carry out an Equality
Impact Assessment and provides an overview of how to do this, along with a short guide on using the online
assessment tool.  18 employees have completed this course so far.
In addition, we continue to provide a range of training modules, including British Sign Language, Deaf Awareness
and Deafblind Awareness.  
In the early part of 2022, partners from the Ayrshire Equality Partnership, including the Council commissioned the
Coalition for Ethnic Minority Voluntary Organisations (CEMVO) to deliver a Cultural and Race Awareness
training session for the partners.  We will continue to explore training opportunities with a view to increasing
the range of equality related training available to employees.
Table Number of E-learning Completions 2021
Course Number of Participants
Equalities E-Learning 902
Deaf Awareness E-Learning 15
Deafblind Awareness E-Learning 13
British Sign Language 51
95

Page 96

Mainstreaming the Equality Duty
Accessibility Audit
Each year our Property Management and Investment Team undertakes an audit of our publicly accessible buildings to
assess their level of accessibility.  The percentage of buildings that meet the criteria for accessibility can change due
to upgrades in existing buildings and size of
our overall estate.
The figures for 2021 and 2022 remain the
same as 2020.  This is largely due to little or
no change in publicly accessible buildings
during the pandemic years.
• A Grade properties = 3.14%
• B Grade properties =70.45%
• C Grade properties = 26.14%
Engagement with our Communities
Our Connected Communities and Housing Services teams have a pivotal role in engaging and supporting various
Community groups across North Ayrshire.  More information can be found in the Equalities Outcomes section on the
work being done to support the LGBT+ community across Ayrshire and within North Ayrshire as well as supporting for
our refugee community.  
We support and engage with tenants across North Ayrshire including direct support for the Gypsy/Travellers
community and Violence Against Women as part of the Community Safety strategy.  We support the 16 days of
Action campaign each November to encourage men to denounce all forms of violence against women.
We work to the outcomes specified in the Scottish Social Housing Charter.  The Charter sets out the standards and
outcomes that all social landlords should aim to achieve when performing their housing activities.  It has a specific
equalities outcome and highlights that social landlords should perform all aspects of their housing services so that
every tenant and other customers have their individual needs recognised, are treated fairly with respect and receive
fair access to housing/housing services.  This outcome describes what all social landlords, by complying with
equalities legislation, should achieve for all tenants and other customers regardless of age, disability, gender
reassignment, marriage and civil partnership, race, religion or belief, sex, or sexual orientation.  It includes landlords’
responsibility for finding ways of understanding the rights and needs of different customers whilst delivering services
that recognise and meet these needs.  
Putting our residents at the heart of our service delivery resulted in our 2022 ‘Gold Reaccreditation’ for embracing
the Social Housing Charter commitment.  In addition, ‘Gold Reaccreditation’ was awarded for our approach to
resident involvement and scrutiny in early 2022.  External accreditations recognise our commitment to placing our
Page 8 of 37
Building Accessibility Categories
Grade A - Fully compliant properties.
Grade B - Reasonably compliant properties that currently provide
ease of access to all users in terms of the services offered.  
Grade C - Non-compliant with a degree of work required to meet
the standard, with high priority issues noted and actioned as soon
as possible.  
96

Page 97

Page 9 of 37
Mainstreaming the Equality Duty
residents at the heart of our organisation, ensuring they are influencing decisions and scrutinising our service areas.
Part of the process for both reaccreditations acknowledges that we have an inclusive approach to engaging tenants
and overcomes barriers by offering a range of opportunities for everyone to get involved.  
We are working to increase representation from Tenant and Resident Associations from across all communities in
North Ayrshire.  We continue to apply innovative ways to maximise involvement opportunities.  An example of this
work was engagement with the Deaf community through the purchase of additional portable hearing loops,
improved links with British Sign Language (BSL) Interpreters and training for staff teams throughout Housing
Services.  Our Tenants newsletter is also available in formats suitable for visually or hearing-impaired customers.  
The Tenant Participation Strategy 2017-2022, highlighted engagement with a range of underrepresented groups. 
The Tenant Participation team has developed links with our other services and has already engaged with some or all
of these groups.
Since October 2019, all social housing landlords have had a requirement to prepare and deliver an Annual Assurance
Statement in accordance with Scottish Housing Regulator guidance.  The statement provides assurance and evidence
that we are meeting all legal obligations associated with housing/homelessness services, equality and human rights,
tenant and resident safety.  
In addition, the statement safeguards and promotes the interests of tenants and other customers.  The North
Ayrshire Network is our strategic tenant group that considers the content of our statement and approves it prior to
publication.
Procurement
Our Procurement Strategy has ‘Tackling Inequality and Poverty in North Ayrshire’ as one of its key aims and has 10
specific actions to support this including encouraging fair work practices and payment of the real living wage in all
relevant contracts.  Equality is also included in procurement contract terms and ‘Fair Work Practices’ are scored or
included for all procurements, as is the Modern Slavery Code of Conduct.
Equality considerations are embedded into our Conditions of Contract documents:
“The Supplier undertakes that it has and shall comply with all statutory requirements in respect of
ensuring equal opportunity in employment and has not and shall not unlawfully discriminate either
directly or indirectly on such grounds as race, colour, ethnic or national origin, disability, gender, sex
or sexual orientation, religion or belief, or age.”
The ‘Modern Day Slavery Code of Conduct’ covers several key themes including forced or involuntary labour, humane
treatment, workplace equality, contracts of employment and Freedom of movement.  More information can be found
on our website.
97

Page 98

Page 10 of 37
Mainstreaming the Equality Duty
Case Study – Equality in Procurement - Provision of a Supported Living Service
(Supported Accommodation)
North Ayrshire Council’s Health and Social Care Partnership were seeking to procure a Supported Accommodation
Service for adults aged 18 – 65 years with a Learning Disability, Physical or Sensory Disability, or Mental Health
difficulty.  The Supported Accommodation Service provides vulnerable people with access to on-site 24/7 personal
and social care support, community health and housing support services.
At contract strategy stage it was identified that equality was a key area which the service team wished bidders to
cover within their tender submissions.  In order to ensure equality considerations were met, the following scored
technical question was included:
“Outline your organisational approach to equality and delivery of a service which embodies section 149 of
the Equality Act 2010 (the Act).
Provide an example which demonstrates how you will approach this to meet the requirements of the NAC
specification.”
The contract was split into two lots and evidence around equality was provided:
Lot 1
Service provider detailed their organisational approach to diversity, equality and inclusion.  They further confirmed
that service designs and support strategies are individually tailored to reflect an individual’s requirements to ensure
these areas are addressed and managed accordingly.  
In addition, they operate a mandatory training course on Equality and Diversity which supports education and
highlights best practice.
Lot 2
Service provider referenced a number of organisational policies which address the key aspects requested within the
tender:
• Involvement of the people we support policy.
• Connecting People and Communities policy.
• Supporting people with their personal identity and relationships.
Detail was provided on their organisational approach to diversity, equality and inclusion and how this is engrained
into all aspects of staff training.
The inclusion of this question ensured that the tenderer’s proposed service delivery met the three key needs of the
Equality Duty.
98

Page 99

Page 11 of 37
Mainstreaming the Equality Duty
Licensing Board Overview
North Ayrshire Council Licensing Board is responsible for making decisions on applications that allow people to sell
alcohol from premises or allow gambling.  They also deal with complaints regarding licensed premises and those who
hold licences.  The Board is made up of Elected Members and is supported by a Clerk (solicitor) and other employees
of our Council.  
Under the Equality Act, Licensing Boards have the same obligations as other public sector organisations to report on
Equality Mainstreaming and to develop Equality Outcomes.  Please follow the link below to the North Ayrshire
Licensing Board Equality Mainstreaming and Outcomes report.  
99

Page 100

Page 12 of 37
Mainstreaming the Equality Duty
Education Authority Report
The Communities and Education Directorate’s vision is to create a society where everyone has the same life chances
to grow, prosper and have fulfilling and healthy lives.
Education in North Ayrshire recognises and celebrates its role in the delivery of positive outcomes for all children and
young people.  We undertake positive interventions to support equalities education for the benefit of our children and
young people and for our employees across our educational establishments.
Our Education Service is responsible for the education of 18,061 pupils across our authority’s primary, secondary and
additional support needs schools.  A further 2,251 children attend early learning and childcare settings.  
• 45% of our Children and young people live in postcodes in the most deprived areas of Scotland according to
SIMD.
• 24% of our Children and young people are living in relative poverty, according to UK government statistics.
• 6,000 of our Children and young people are registered for school footwear and clothing grants.
Education in North Ayrshire is delivered through:
• 48 primary schools.
• 8 secondary schools.
• 1 through school (Garnock Campus). 
• 1 specialist campus for children and young people with additional support needs. 
• 5 Council-managed early learning and childcare centres.
• 16 centres where early learning and childcare is provided in partnership.
• There are 41 Council-managed early learning and childcare settings. 
Children Attending Early Years Settings 
• In 2021 – 1,567 pupils recorded as attending an Early Year setting.
• In 2022 – 1,545 pupils recorded attending an Early Year setting, of which about 1,106 were in local authority
Early Years settings and 411 in private and voluntary Early Year settings. 
We are focussed on the Council Plan outcome that North Ayrshire’s children and young people have the best start in
life.  Our Directorate’s priorities clearly show how equality and diversity sit at the very heart of our work: embedded
in educational provision; in professional learning; and in the promotion of positive relationships.  
National Improvement Framework priorities for 2021-22 were: 
• Improvement in attainment, particularly in literacy and numeracy.
• Improvement in children and young people's health and wellbeing.
• Closing the attainment gap between the most and least disadvantaged children and young people.
• Improvement in employability skills and sustained, positive school-leaver destinations for all young people. 
The National Improvement Framework priorities are embedded within our Education priorities:
1. We will create the conditions for our children and young people to access the
highest quality learning experiences from ages 3-18 years.
2. We will support our children and young people to become successful learners,
confident individuals, effective contributors and responsible citizens.
3. We will offer opportunities to our young people and their families to play a
more active role in school life and encourage more participation in learning.
4. We will work with all young people to build their resilience, supporting their
mental health and physical wellbeing.
100

Page 101

Page 13 of 37
Mainstreaming the Equality Duty
Our schools use the Curriculum for Excellence framework to create, devise and deliver education suited to the local
context for all learners in their communities.  Effective planning tracking, monitoring and moderation of assessments
are essential to ensure the progress of all learners. 
The framework provides a coherent, flexible and enriched curriculum for all children and young people from 3-18
years.  Children and young people are at the center of learning provision to become: 
Getting it Right for Every Child
Our understanding of Getting It Right for Every Child (GIRFEC) continues to be a focus within all aspects for our
practice and professional learning.  The principles underpin all the processes within our Council in support of children
and young people. 
Through GIRFEC, we can determine proportionate, timely and appropriate help for young people, improving each
child’s situation and reducing risk.  The approach supports the achievement and attainment of best outcomes for all
our young people, demonstrated through the review and impact of personalised targets in Children’s Plans.  All our
young people have the entitlement to support which is appropriately developed through our Staged Intervention
Programme (in line with Additional Supports Needs legislation) and monitored and evaluated using the National
GIRFEC Practice Model.   Information from Quality Improvement visits reveal that almost all our children and young
people with additional support needs plans are making very good progress (over 90%) from their prior levels of
achievement.   
Nurture/Health and wellbeing
Nurture/Health and wellbeing contributes to our vision of being a nurturing authority.  This has been further developed
through our “Nurturing North Ayrshire’s Recovery” approach.  We aim to build emotional resilience in children and
train teachers to foster stronger relationships with children and young people through a nurturing approach,
increasing engagement in the learning process.  Evidence shows that this is reducing instances of non-engagement
with children and young people and is contributing towards raising attainment. 
Nurture
Children and young people who have received nurture support are showing gains in social and emotional progress in
early years, primary and secondary settings during the course of targeted nurture intervention and are continuing to
access mainstream education.
Primary Nurture
North Ayrshire follows a prescribed model for nurture intervention, governed by a Senior Manager and quality
assured by two Nurture Principal Teachers.  Nurture Practitioners attend a three-day initial training course and
weekly professional learning inputs which has been awarded a GTCS excellence award in professional learning. 
Learners attend the morning session then their mainstream class in the afternoon.  The nurture room follows a
wellbeing curriculum.  A nurture day is planned and predictable with check in, snack and a mix of play-based learning
activities.   
Successful
learners
Confident
individuals
Responsible
citizens
Effective
contributors
101

Page 102

Page 14 of 37
Mainstreaming the Equality Duty
The impact of primary nurture interventions is further highlighted through the Strengths and Difficulties
Questionnaires (SDQs) which are completed by class teachers and parents of the children when they enter and exit
the morning nurture group.  Based on 241 responses up to June 2021, Class teacher SDQ’s show that for 61% of
children an improvement is reported in their prosocial skills following nurture provision.  Class teachers have also
reported a reduction of total difficulties for 76% of the children that received nurture provision. 
Reflective Quotes on Primary Nurture: 
“Before nurture David* was not ready to learn.  He was five (years old) but developmentally two
and a half or maybe even two (years old). He is now achieving so much.  He is sent along with his
work to me and I phone his mother when he is there and say, ‘Do you know what David has done,
his work is phenomenal!” (Primary School Head Teacher.) (*Name has been changed.) 
“Every single child that comes through has shown a very easily mapped difference, a very easy to
spot difference in their approach to school in general….. the difference is just remarkable.”
(Primary School Head Teacher.) 
Secondary School Nurture
Across North Ayrshire there were nine secondary school nurture groups that were funded through the Scottish
Attainment Challenge in the 2020-21 academic year.  Between August 2020 and June 2021, 326 young people (57%
male, 43% female) had completed the secondary nurture intervention.  Updated figures will be available from June
2023. 
Within the secondary model S1 have daily contact, S2 have three weekly sessions (minimum) and 1:1 sessions are
provided on an individual basis.  The nurture room follows a wellbeing curriculum.  As with the primary model, a
nurture day is planned and predictable including check in, snack and a mix of developmental and chronologically
appropriate learning activities.   
The impact of secondary nurture provision is evidenced through the completion of the Stirling Children’s Wellbeing
Scale (SCWBS) by young people at their entry and exit points to the intervention.  SCWBS highlighted that almost half
(48%) of young people reported improvement in their own wellbeing.
The thematic analysis of qualitative data from teachers illustrates that achievement is visible in other areas of school
life.  Nurture staff have reported observing the sustainable impact of Nurture in our participating young people.  
102

Page 103

Page 15 of 37
Mainstreaming the Equality Duty
Children’s Rights
All schools promote children’s rights.  The Rights Respecting Schools programme (RRS) has been promoted and
introduced into almost all our schools.  The Rights Respecting Schools Award (RRSA) recognises achievement in putting
the United Nations Convention on the Rights of the Child (UNCRC) at the heart of a school’s planning, policies, practice
and ethos.  Children’s rights underpin the Getting it Right for Every Child approach. 
RRS teaches about children’s rights, but also models rights and
respect in all relationships, whether they are between teachers
or other adults and pupils, between adults or between pupils. 
RRS underpins our Integrated Children’s Service Plan, Promoting
Positive Relationships and anti-bullying policies.  The UNCRC
provides a clear link for pupils from rights-respecting schools, to
understanding their rights and children’s rights being realised
everywhere.  Children and young people in rights-respecting
schools develop a stronger sense of the need to act for global
justice.  Over 90% of our schools are participating in the RRS
status with nineteen schools reaching gold or Ambassador Status
and twenty-five schools achieving Silver.   
Our anti-bullying policy entitled “Bullying - It’s Never
Acceptable” is now established.  Enhanced and more accurate reporting and recording of prejudiced based bullying
has been in place for a year.  Our partnership with “Respect Me” Scotland’s anti-bullying service for schools continues
and this provides a source for professional learning in this area of health and wellbeing. 
Recording of bullying incidents has led to improved responses by professionals and better outcomes for our young
people due to the support we provide.  Requests for assistance indicate that this work requires to continue particularly
regarding online bullying behaviour.  Anti-bullying work remains a focus for our Child Protection Working party.  There
are regular updates to training which provides links to online supports for parents, employees and our young people.   
LGBTI Education
LGBTI education forms part of the learning (primarily and secondary schools) focussing on social and emotional
resilience, including mental health in relationships, sexuality and sexual behaviour.  The use of curriculum benchmarks
ensures that progress of young people is measured throughout this key area of education.  
We have been successful in gaining funding through the Youth Work education fund to deliver targeted sessions
through the mobile youth centre.  This work will include a focus on our hard-to-reach groups including the LGBT
community.  They will be offered support with mental health and wellbeing as well as employability.  The following
resources will be utilised to support this approach:
• SHARE (Sexual Health and Relationships in Education) is evidence informed educational resource for use by
teachers.  The focus is on interactive learning for pupils aged 13 – 16 years.
• The NHS resource FIT, contains steps towards combatting phobic language in schools.  
• ‘See Me’, is Scotland’s programme with the goal to end all stigma and discrimination around mental health.
• LGBT Scotland bespoke programmes of study which include discussions on sexuality and risky sexual
behaviours. 
Rights Respecting Schools
19 Gold award schools fully Rights
Respecting with a Children’s Rights
ambassador status
25 Silver award schools who are
fully rights aware
who are
Children’s Rights committed
103

Page 104

Page 16 of 37
Mainstreaming the Equality Duty
Reducing inequality and delivering improved outcomes for all children and young
people
A key feature of our work is the delivery of a fully inclusive approach which is suited to the needs of all children and
young people and their families.  This work has extended nurturing approaches from primary schools into early years
establishments and into secondary schools.   
Our Quality Assurance processes and visits to schools have captured many examples of the effective use of Pupil Equity
Funding (PEF), used by schools to reduce the effects of poverty on attainment).  HMIE inspections reports have
highlighted the delivery of a range of targeted interventions including nurture is supporting the wellbeing and
development of children.  Increasingly, school teams are alert to barriers to participation.  Financial assistance (through
PEF) is available to enable all families to fully access the opportunities on offer to children e.g.  Breakfast clubs,
reducing the cost of the school day and improving access to residential experiences.   
Through our Children Services Executive Group and Inclusion Group we continue to review our services to support
children and young people with particular vulnerabilities and more specific Additional Support Needs.  Our approach
to Integrated Children’s Service Planning ensures that all services have a GIRFEC approach to meeting the needs of our
children and families. 
Case Study – Nurture pupil voice in Secondary Schools 
A review to establish the effectiveness of nurture group intervention highlighted a need to adopt a more qualitative
research approach focussing on pupil views to gather individuals’ thoughts and feelings about the learning and
experiences of nurture group intervention.  
Pupil View Templates (PVTs) were completed in collaboration with Educational Psychologist Dr Kim Whitehead,
Educational Psychology Assistants and Nurture Principal Teachers as a method of collecting the pupil voice across
North Ayrshire secondary nurture rooms.  Professional learning was delivered to Nurture Practitioners on the PVT
model, designed and adapted to suit the needs of the group so our young people could think about what they have
learnt and what skills they have achieved as well as what they think the benefits are and what they would tell others
about the nurture group.  Learners interpreted features of the nurture room using construction, drawings, or words. 
The resulting template then acted as a stimulus for a mediated conversation using a list of prompt questions
developed from examples provided by Wall and Higgins (2007).  
The data from this pupil voice project will inform and improve outcomes for young people.  Pupil View Templates
can be used for professional learning to give educators an understanding of how pupils think and learn… “I didn’t
know you thought this.  Now that I know this I can…”
This process fulfils the requirements of Article 12 UNCRC “all children have a right to have their voices heard and
taken seriously”.  Analysis will be completed by Educational Psychology assistants and personalised data will be given
to each school.  The collective response will be analysed to develop emerging themes for the nurture service and to
inform strategic planning. 
Strengths in Education 
The central Education team’s drive, vision and capacity for continuous improvement remains a key strength.  This is
supported by highly effective governance structures.  We continue to provide opportunities for innovation within an
appropriate framework of accountability at all levels. 
• There are shared values and common purpose where school teams feel valued and very well supported.  This
was evident from our questionnaire responses in relation to COVID.  These responses were used to build a
recovery programme for teams, pupils and their families in the form of E-learning modules.
104

Page 105

Page 17 of 37
Mainstreaming the Equality Duty
• The very strong leadership team is driving improved outcomes for children and young people.
• Partnership working within the Scottish Attainment Challenge thematic workstreams is leading to improved
outcomes for children, young people and their families living in the areas of highest deprivation.
• Very effective self-evaluation is leading to improved learning, raised attainment and a narrowing of the
poverty-related attainment gap.
• Very strong approaches to staff development are evident across the whole authority led by the work
undertaken by our Professional Leadership Academy.  The development of leadership at all levels is building
leadership capacity across the authority. 
In addition, our Educational Psychology Service continue to make a strong contribution to helping to close the poverty-
related attainment gap in North Ayrshire.  This is particularly evident in relation to the implementation of nurture and
restorative practices. 
Supporting our Young Carers 
Helping to raising awareness of Young Carers and the supports available to them, our area Inclusion workers took part
in a session at the Carers centre.  Each school identified a Young Carers lead and workshops were planned for January
2023 to upskill our employees to support them in completing the Young Carers Statement. 
Mentors in Violence Project (MVP)
Eight of our nine secondary schools are now taking part in this programme in the 2022/23 session.  Over 60
employees have been trained and over 200 young people in North Ayrshire are MVP mentors, delivering learning to
hundreds of young people in our schools.    
Mentors are developing leadership, exploring violence through a gendered lens, using a bystander approach,
exploring the scope of violent behaviour and challenging victim blaming.    
Staff and mentors are working together to increase communication and to support them in becoming active by-
standers.  This means they will gain more knowledge and confidence in challenging negative behaviours and
comments around these issues.    
Leadership accreditation is being sought in several schools using MVP as evidence of these skills in action.  Early
indications from schools show that mentors are confidently delivering lessons to junior classes.  There is a greater
shared understanding of issues related to gender-based violence and bullying.  The programme has been welcomed
in all participating schools.    
Capacity building for staff will continue in 2023 with the National offer and bespoke North Ayrshire training and we
have requested training for Arran this session.    
Training has been arranged at our Lockhart Campus that will be specific to the needs of this school.    
As a local authority we have offered and will offer 30 min training on both MVP and Equally Safe At School (ESAS) to
raise awareness.  MVP mentors took part in the ‘Reclaim the Night Walk’ as part of the Prevention of violence
against women programme.   
105

Page 106

Page 18 of 37
Mainstreaming the Equality Duty
Case Study:  See Me - See Change 
A ‘See Me See Change’ event took place on the 31st of October and 3rd of November 2022 attended by around 200
young people from Ardrossan Academy, Auchenharvie Academy, Garnock Community Campus, Greenwood
Academy, Irvine Royal Academy, Kilwinning Academy, Largs Academy and St Matthews Academy. 
Teams from each school took part in twilight online training prior to the event and are now well placed to support
them in school. Support was provided at the event by our Community Youth work apprentices who also undertook
virtual training. 
The ‘See Me See Change’ training programme offers training for pupils and employees, before bringing the two
groups together for an action planning session to agree how they will work together to tackle mental health stigma
and discrimination within their school.  
It is hoped our next training session for employees will be in May/June 2023 and New S5 Pupils June 2023 that will
allow the programme to grow and become embedded in our schools as part of the Whole School Approach to
Mental Health and Wellbeing Framework. 
106

Page 107

Page 19 of 37
Mainstreaming the Equality Duty
Employee Statistics Overview
The Public Sector Equality Duty requires local authorities to gather and publish employee statistics by protected
characteristic.  This section of the report includes an overview of employee information by age, sex, ethnicity,
disability, sexual orientation, religion and belief.  It also includes the Employee Pay Gap information by sex, ethnicity
and disability.  Full information on our employee statistics can be found in our supporting report – Employee Statistics
2019 - 2022.
It is recommended we publish information in some key areas including: 
• Employee Headcount by protected characteristic.
• Recruitment by protected characteristic.
• Employee Turnover by protected characteristic.
• Employee Training by protected characteristic.
Data prior to 2021 may differ slightly from the statistics produced in our 2019 and 2020 Mainstreaming Report.  This
is due to minor discrepancies in calculations that have since been corrected.
Disability
In 2022, 3.7% (302) of our employees had a declared
disability and 18% (1,487) did not disclose this
information.  The percentage of employees declaring a
disability has increased since our 2020 report and the
percentage of those not disclosing this information has
decreased.  45% of employees with a disability work in
Grades 4 – 10 and 15% are in teaching posts.  
The chart to the right shows turnover was higher in 2022
at 12.11% for people with a disability against 8.71% for
those without a disability.  A slightly higher percentage of
people with no disability received or attended training
compared with those who were disabled.  This figure
fluctuates annually.
Within Education, 3% of employees declared a disability in 2022, which has increased from 1.8% in 2020.
Ethnicity 
The 2011 Census shows North Ayrshire continues to
have a small black or minority ethnic population at
1.1% of our population, it is expected the 2022
Census will show an increase.  The relatively low
percentage of people from a black or minority ethnic
background living in North Ayrshire is reflected in our
employee statistics.  In 2022, 1.1% of employees had
declared an ethnicity other than white (with 16% not
disclosed).  Our 2020 statistics showed 0.83% from
another ethnicity and 18.8% not disclosed.
The percentage of people from ‘other ethnicity’
leaving our Council has remained higher than ‘white’
in recent years.  Although the overall gap narrowed in 2022, this figure was due to fewer temporary employees.  
107

Page 108

Page 20 of 37
Mainstreaming the Equality Duty
Within Education, 42 employees (1%) were from the ‘Other Ethnicity’ category, with 18 teaching staff and one
promoted staff.  Turnover for Education employees is slightly higher for ‘white’ employees at 7.61% compared to
7.14% for ‘Other Ethnicity’.  ‘Not disclosed’ had the highest turnover at 8.75% 
Age
Similar to many other organisations, our Council has an ageing workforce, with just over 40% of employees aged 50
or over, this jumps to 54% for those aged 45 and over.  Employee turnover is highest in the 65-69 age category,
increasing from around 55 years due to employees choosing to retire. 
Education headcount for age is much lower than our Council as a whole, with only 25% of employees over the age of
50 years.  Just over 60% of teaching staff are under the age of 45.  
Sex
In 2022, 25% of our Council employees were male,
75% female.  3.0% (249) of our female employees are
in promoted posts of Grade 11 -17 compared to
1.65% (136) of our male employees.  Although 3% of
our promoted posts are held by females, the
percentage overall in promoted posts as a proportion
of total female employees is 4%, whereas for males
as a proportion of total male staff is 6.6%.  This
indicates relative to the overall workforce, there is a
slightly higher proportion of males in promoted
posts, however in the most senior promoted posts,
11 of our 19 Chief Officers are female.
The majority of employees are Grades 4 – 7, with 36% (2971) female and 11% (916) of male employees working at this
level.  For the first time in a number of years, 1.3% more males received training than females.  There was a higher
percentage of staff turnover for females compared to males at 8.59% compared to 8.14%.
Within Education, 81% of teaching employees are female.  20.4% (280) of female teaching employees are in a
promoted role, compared with 27.9% (90) of males in a promoted post. 
108

Page 109

Page 21 of 37
Mainstreaming the Equality Duty
Sexual Orientation
In 2022, 89 employees identified as Lesbian, Gay or Bisexual (LGB) or 1.1% of the workforce, compared to 0.6% (46)
employees in 2020; 48% of employees identified as Heterosexual and 51% of employees did not disclose their sexual
orientation (57% in 2020).  With very low numbers it is difficult to identify specific issues or trends.  During 2022, 11
employees identifying as LGB left our Council or 12% of all our employees identifying LGB.  For those employees
identifying as Heterosexual, this figure was 8% that year.  There are no specific issues around training or recruitment.  
During 2022, 21 (0.72%) of education employees identified as Lesbian, Gay or Bisexual (an increase from 0.6% in 2020). 
During 2022, a slightly lower percentage of employees identifying as Lesbian or Gay left our Education Service
compared to Heterosexual employees (6.9% vs 7.52%).   
Religion or Belief (including no belief)
As with our employee statistics for Sexual Orientation, the ‘Not disclosed’ percentage is very high at 52.5% of
employees, although this is an improvement from our 2020 report of 58.4% not disclosing.  This makes it challenging
to identifying real trends.  Other than the not disclosed group, the next highest group is employees with no religion or
belief at 25.9% of employees which is an increase of 5.4% from 2020, followed by Church of Scotland (11.8%, a 0.2%
increase), Roman Catholic (6.4%, a 0.2% increase), and Other Christian (2.4%, a 0.1% decrease).  
In relation to employee turnover the highest percentage of leavers was for ‘Not Disclosed’, Humanist, Other Christian
and Other belief/religion.  Other categories of religious groups by number include, Humanist (18), Buddhist (10),
Muslim (7), Hindu (1) and Jewish (1).
Within Education, 51.7% of employees did not disclose their religion or belief (a decrease of 8.2% since 2020), followed
by employees with no religion or belief at 24%, Church of Scotland at 12.8% and Roman Catholic at 7.5%.  
109

Page 110

Page 22 of 37
Mainstreaming the Equality Duty 
Further Considerations
We recognise that there is a high percentage of ‘not disclosed’ with some of our statistics.  Following an exercise to
encourage our employees to update their records, we have seen improvements in the number of employees disclosing
for disability, ethnicity, sexual orientation and religion and belief.  We will periodically continue to encourage our
employees to update their records. 
Employee Pay Gap Information
Under legislation, we are required to publish our pay gap information for Gender, Disability and Ethnicity.
Our Gender Pay Gap for 2022 is 0.22%; which is our lowest figure since pay gap reporting was introduced, the last four
year trend has seen a steady closing of the mean pay gap from 1.48% in 2019 to 0.22% at the end of December 2022. 
Mean Pay Difference (basic hourly rate) 
2019 2020 2021 2022
Female 16.02 16.54 16.54 18.03
Male 16.26 16.76 16.74 18.07
Difference
(%) 1.48 1.31 1.19 0.22 
Our Disability Pay Gap for 2022 is 7.44%, which is an increase from 2021 of 3.32% and has increased from a low of
0.88% in 2019.  There are potentially a number of reasons for this, including the relatively low percentage of employees
declaring a disability, meaning small changes to the workforce may have a significant impact on the percentage figures. 
In part, due to encouraging our employees to update their records, we have seen a slight increase in the percentage
of employees declaring a disability, from 2.2% in 2019 to 3.7% in 2022.   
110

Page 111

Page 23 of 37
Mainstreaming the Equality Duty
Our Council has implemented a number of activities to both support employees with a disability and to support
potential candidates into employment; these include an internal employee disability forum, the Equal Supported
Employment programme and the See Me CV programme for people with a disability applying for a Modern
Apprenticeship.  
Mean Pay Difference (basic hourly rate) 
2019 2020 2021 2022
Disabled 15.77 15.62 15.83 16.66
Not
disabled 15.91 16.49 16.51 18.00
Difference
(%) 0.88 5.28 4.12 7.44 
Our Ethnicity Pay Gap figure in 2022 was 0.89%, this figure has fluctuated over the last four years, with each alternative
year since 2019, having a positive pay gap in favour of ‘other ethnicity’.  Although for 2022 this figure is positive for
employees of a white ethnicity, this is less than 1% of a difference.  In part, the recent encouragement for employees
to update their personal records including their ethnic status saw an increase of employees from ‘other ethnicity’ from
63 in 2020 to 93 in 2022.  
Mean Pay Difference (basic hourly rate) 
2019 2020 2021 2022
Other
Ethnicity 16.15 16.38 16.69 17.81
White 15.89 16.46 16.47 17.97
Difference
(%) -1.64 0.49 -1.34 0.89 
Occupational Segregation
Information
Occupational Segregation is one of the key factors
influencing the gender pay gap.  It concerns
aspects of employment that see men and women
being clustered into different occupations.  There
are several influences on Occupational
Segregation and these include gender norms and
stereotyping.
There are two main types of Occupational
Segregation, which are considered as ‘Horizontal’
and ‘Vertical’.   
Gender (Sex)
The gender split in the Council is 75 – 25% female to male.  The highest percentage of ‘female to male’ employees
work in grades 4 - 7 and in teaching (78%).  The greatest number of females work in grades 4 -7 or 35% of the total
workforce and 47% of the total female workforce.
Horizontal Segregation:  People with certain
protected characteristics being clustered into
certain job types.  For women this could be
occupations that are associated with low pay and
fewer opportunities for progression, such as care
work, cleaning, catering and administration work. 
In comparison men may be more often found in
occupations that pay higher wages, including the
trades, engineering, or technical work.
Vertical Segregation:  Those with particular
protected characteristics may be more likely to be
clustered into certain positions and be more absent
from senior management and executive positions.
111

Page 112

Page 24 of 37
Mainstreaming the Equality Duty
Within the management and senior management grades (11 – 17), as a % of the total female workforce, 4.0% are in
this category, with 6.6% of males as a total of male employees.  The percentage split for our Chief Officers is 58%
female to male.  
The table below provides an average hourly rate by sex for 2022 and 2020 for comparison.  The grades with the biggest
pay gap percentage are 4 – 7 (4.04%), 11 – 17 (3.59%) (management), promoted teacher (3.4%) and Chief Officers
(2.82%).  Grades 4 - 7 are where the highest number of female employees are employed and from a ‘horizontal
segregation’ perspective will be where some ‘traditionally’ female oriented roles such as caring and catering roles are
based.  Grades where the pay gap favours females include Grades 8 – 10 (-0.05%), other (-0.60%) and teaching staff (-
1.31%).
Average Hourly Rate 2022 Variance 
Female
(£)
Male
(£)
% variance
(2022)
% variance
(2020)
Grades 1 - 3 - - - -
Grades 4 - 7 12.83 13.67 6.14 4.04
Grades 8 - 10 20.41 20.47 0.29 -0.05
Grades 11 - 17 27.06 27.89 2.98 3.59
Other 11.00 11.26 2.31 -0.60
Chief Officer 54.84 57.04 3.86 2.82
Teacher 26.44 26.10 -1.30 -1.31
Promoted Teacher 35.47 36.20 2.02 3.40
Total Workforce 18.03 18.07 0.22 1.31 
Ethnicity
For Employees with an ethnicity other than white, it is difficult to discern any trends due to the low numbers of
employees from the other ethnicity category.  The ‘Other Ethnicity’/White split for grades 4–7 is 45% for those of an
“Other ethnicity” and 47% white.  For grades 8-10 the comparison is 14% other ethnicity compared to 16% white and
for Grades 11 – 17, 3% of employees are other ethnicity compared to 5% white.  There are no minority ethnic
employees at Chief Officer level, but the figures don’t indicate any particular trends with the spread of minority ethnic
employees across grades within our Council. 
Disability
Similarly, to our employee information for other ethnicity, in relation to employees with a declared disability we have
302 employees or 3.7% of the total workforce with a known disability and 18% not disclosed.  
Within the gradings, when comparing the number of disabled employees within each of the categories against the
total disabled figure and the non-disabled against total non-disabled, there are no significant differences.  
For Grades 4–7, 45% of those with a disability are employed in this category, compared to 47% non-disabled.   For
Grades 8–10, 16% of employees with a disability, compared to 16% non-disabled and for Grade 11 – 17, 5% of
employees with a disability and 5.4% are non-disabled.   
112

Page 113

Page 25 of 37
All public sector organisations are required to set Equality Outcomes every four years.  This
report covers the mid-point of the four-yearly Equality Outcome 2021 - 2025 reporting period
and contains information and data covering the calendar years of 2021 and 2022.
National guidance on setting equality outcomes states that they should be proportionate and relevant to the functions
and strategic priorities of the organisations setting them, and that they may include both short and long-term benefits
for people with protected characteristics.  Our Equality Outcomes have been developed as short to medium term (one
to four years) and link with both longer term and national outcomes.  In addition, we have adopted sub-outcomes and
actions to support the main overarching outcomes.
A number of these equality outcomes link with already existing policies and strategies.  This is to help embed the
outcomes in our activities and drive a more focused effort on areas for improvement specifically to improve equality
and reduce inequalities.
Ayrshire Shared Equality Outcomes
The public sector partners of the Ayrshire Equality Partnership agreed to consult on and develop shared outcomes and
actions across Ayrshire.  Alongside our Council, partners include East and South Ayrshire Councils, North, East and
South Ayrshire Health and Social Care Partnerships, NHS Ayrshire and Arran, Ayrshire College, Ayrshire Joint Evaluation
Board and the South West Community Justice Authority.
All the organisations involved support the same communities, therefore this coordinated approach to consulting with
our interest groups helps avoid consultation fatigue.  Additionally, through sharing resources and expertise during the
consultation and development process and into the implementation phase, this ultimately improves the experiences
of communities through a more consistent approach across the partner agencies.  
The development of the shared equality outcomes and actions allow partner agencies to maintain their own individual
organisational accountability for reporting on equality mainstreaming and outcomes, while recognising the shared
work of the partner agencies.  
The Ayrshire Shared Overarching Outcomes are as follows.    
The actions supporting each of the four equality outcomes and sub-outcomes are outlined below alongside the pan-
Ayrshire updates.  
Equality Outcomes
Outcome 1
In Ayrshire people
experience safe and
inclusive communities
Outcome 2
In Ayrshire people have the
opportunity to access and
shape our public services
Outcome 3
In Ayrshire people have the
opportunity to fulfil their
potential throughout life
Outcome 4
In Ayrshire public bodies
will be inclusive and
diverse employers
113

Page 114

Page 26 of 37
Equality Outcomes
Equality Outcomes
Equality Outcome 1 – In Ayrshire people experience safe and inclusive
communities 
Sub-Outcome - Through a variety of methods victims, witnesses and partner
agencies feel more confident in reporting hate incidents. 
1.1 Key Actions Supporting this Outcome
• Raise Awareness to better understand hate crime.
• Work with partners to raise awareness of hate crime with community members through a conference.
• Work with partners to increase awareness of third party reporting.
• Develop a Hate Crime awareness course.
Progress
During 2022, members of the Ayrshire Equality Partnership, including our Council came together to organise a Hate
Crime Awareness Conference.  The conference took place at Ayrshire College, Kilmarnock on 5 October 2022 with
the overall aim of Empowering Communities in Ayrshire to end Hate Crime.  
Dave Scott, Campaign Director Nil by Mouth charity hosted the conference with keynote addresses from Dr Christian
Harrison, Reader in Leadership and Khadjia Mohammed, Senior Lecturer both from the University of the West of
Scotland.  The conference also offered workshops for participants to choose from including the ‘I am me’ charity
(Keep Safe initiative); Scottish Refugee Council; Police Scotland and the Procurator Fiscal Service, Community Justice
Authority and LGBT+ experience.  The conference offered opportunities to support learning about hate crime
through the lived experiences of its speakers and the good practice demonstrated across Ayrshire and beyond to
tackle the issues related to hate crime and promote positive solutions.
Over 100 people from various partner agencies, including students from Ayrshire College attended the event, which
evaluated very positively.  Following on from the event information on third party reporting was disseminated to
local community groups across Ayrshire.  Partners are in discussions to create hate crime awareness training.
Third Party Reporting was highlighted as part of the conference approach and disseminated via partners.  As most, if
not all, third party reporting centres were closed during the pandemic, further work will be required during 2023 and
onwards to re-establish centres as third-party reporting venues.  
114

Page 115

Page 27 of 37
Equality Outcomes
Equality Outcome 2 – In Ayrshire, people have equal opportunity to access and
shape our public services - Ayrshire Shared Actions
Sub Outcome - Improve engagement with our services and enhance access to
information for marginalised and under-represented groups 
2.2 Key Actions supporting this Outcome
• Work with the Council’s Web Team and Sensory Impairment Team to create a BSL friendly landing page on
our website.
• Work with our Web Team and our Connected Communities Teams to create a community language landing
page for North Ayrshire residents 
• Explore joint approach for the commissioning of BSL Interpretation. 
Progress
In addition to the British Sign Language (BSL) Plan landing page and videos in BSL on Council services during the
pandemic, an additional page for BSL was added to our Council’s main website during 2022.  This page contains videos
in BSL on various topics such as school holidays, bin collections, contact us, council tax and recycling centres.  Since
going live in late 2022, the site has had 150 views and 125 unique user views.  We aim to add more BSL videos through
further engagement with the BSL community and Council services.
Due to a number of issues the community language landing page did not progress as planned.  However further
discussions have been taken place to find a way forward.  
Progress has been made with the partners on agreeing a joint approach to commissioning BSL interpretation services,
with the aim of keeping costs to partner agencies as low as possible.  It is hoped this can be launched during 2023. 
Equality Outcome 3 - In Ayrshire, people have opportunities to fulfil their
potential throughout life
Sub-Outcome 3A - Our young people, disabled people and women have access to
training and employment. 
3.1 Key actions supporting this Outcome
Through the Ayrshire Growth Deal:
• Provide support for unemployed residents, in particular people with disabilities and women, to overcome
health barriers to economic activity.
• To support residents to retain employment by addressing health barriers.
• Support local businesses to access health related supports to improve retention and productivity of their
workforce.   
115

Page 116

Page 28 of 37
Equality Outcomes
Progress
Working for a Healthy Economy is a large-scale investment, totalling £5million, to deliver occupational health to ensure
that Ayrshire has the requisite workforce to drive economic growth in the future.    This project, implemented in May
2021, will serve to widen the labour pool and provide the basis for the maximisation of benefits arising from Ayrshire
Growth Deal capital investments.  It will support: 
• Unemployed residents overcome health barriers to economic activity.
• Employed residents to retain employment by addressing health barriers.
• Local businesses to access health related supports to improve retention and productivity of their
workforce. 
Since its initiation in in May 2021, the Working for a Healthier Economy programme has engaged with 514 unemployed
individuals.  Evaluations have shown that 34.6% of people reduced their anxiety levels, 43.3% reduced levels of
depression, 26.5% improved their health and wellbeing and 51 people gained employment.  Further work is on-going
to review information being gathered in relation to other protected characteristics, including those with a disability.
Case Study – Working for a Healthy Economy 
Anne* is 54 years old and was recently made redundant after many years in the same job.  This change has had a
detrimental effect on her wellbeing as she has high levels of anxiety and feels low most of the time.  She has
difficulty leaving the house, socialising with friends and placing herself in social environments and three weeks prior
to meeting with someone from Working for a Healthy Economy, had attempted to take her own life.   Anne
participated in anxiety management using Cognitive Behavioural Therapy and started seeing friends again socially. 
She also took up volunteering as a step towards employment. 
(*Name has been changed) 
Sub-Outcome 3A:  Our young people, disabled people and women have access to
training and employment. 
Equal Supported Employment Programme
Our Equal Supported Employment Service provide opportunities for
those with disabilities where their academic achievement has been
prohibitive to their career development.  
It is accepted that to progress within a chosen career, academic study is
required to progress within a high number of fields.  By providing practical experience, it is anticipated that those
with neuro diverse disabilities will have the ability to progress towards fulfilling long term employment.  
To support this process practical training via the Royal Horticultural Society Awards scheme (RHSA) provides
participants with a solid certificate of their achievements and work experience in a horticultural environment.  
3.2 Key Actions Supporting this Outcome
• To offer candidates the opportunity of paid work experience in the Horticulture industry whilst working
alongside several local organisations creating a Community Garden.
• To provide additional practical training via the Royal Horticultural Society awards scheme which should
result in solid knowledge and experience for future permanent employment within the Horticulture industry.
116

Page 117

Page 29 of 37
Equality Outcomes
Progress
During 2021, the Equal Supported Employment team were successful in setting up a horticultural programme at
Eglinton Park in Irvine.  The programme supports small groups of people through paid work experience, to gain the
skills and confidence of working in this type of environment and to build their workplace skills in general.  This
resulted in: 
• 26 residents attending over three courses, with 16 competing the course and 10 still ongoing at the time of
writing.
• Of the 16 people who have completed the work experience, six have moved into full time employment; four
started volunteering; one progressed to university; two progressed to college and two moved to further
providers for additional support.
• In relation to the Royal Horticultural Society award scheme, 10 participants achieved a full pass in the RCHS
modules and an additional seven achieved SQA units in Horticulture.
Key neurodiverse conditions supported include people with Autism, attention-deficit/hyperactivity disorder (ADHD),
learning disability, mental health issues, Cerebral Palsy and partial sightedness.
Positive feedback was received from every person participating in the scheme, with general comments stating that it
was an excellent experience and a positive educational result for everyone involved.  
Moving forward, in-work support will continue for all those that are in employment and volunteering, this will
provide continued support for all clients to ensure further career progression. 
Case Study 1 – Steven’s Story
Steven* joined Equal shortly after leaving school. He quickly progressed as a Trainee Horticulture Assistant at
Eglinton Garden. His dyslexia had caused him problems throughout his learning and we adapted learning styles to
suit. He worked really hard with his advisor to progress through his training and this ensured that he achieved his
Grow and Learn Certification from the Royal Caledonian Horticultural Society. 
During his six months paid work experience Steven became a valuable team member and specialised in using heavier
garden machinery such as a petrol driven strimmer and mower and he began to express an interest in working with
heavy machinery. 
An opportunity arose through Kickstart within Bridgend Garage for a trainee and Steven applied for and successfully
gained the job. He was still concerned that his dyslexia would be an obstacle, however his advisor worked with both
him and Bridgend Training staff to ensure a smooth transition into work. 
Equal advisors continued to support and ensured that his 6 months went smoothly. Management was trained and
staff awareness sessions were held at the employer’s premises. 
After his six-month contract had ended, Steven was taken on full time in a permanent position and has progressed
from being quiet and reserved to become much more confident. Equal continue to work with Steven behind the
scenes and are always on call should the need arise.
(*Name has been changed.) 
117

Page 118

Page 30 of 37
Equality Outcomes
Case Study 2 – Nadine’s Story
Nadine* came to EQUAL straight from school and was appointed an advisor right away. During her appointments
with her Advisor, Nadine advised that she was looking for a Modern Apprenticeship in Business Administration as
she had a keen interest in this and possessed strong Microsoft skills she wanted to develop further.
Nadine was confident in applying for a Modern Apprenticeship position with North Ayrshire Council and achieved an
interview pretty quickly.  She was successful in gaining a post within the Health and Social Care Partnership.  Her
Advisor contacted her new manager to advise of the role that EQUAL could provide.  She also arranged for an Access
to Work assessment to be carried out to support Nadine’s disability.  During COVID and the restricted return to work
period afterwards Nadine’s new department was not fully manned and teams were struggling to support Nadine at
work every day.  Her Advisor attended office three days per week for an initial period of three months to support
with duties and empower Nadine when using systems and scanning of complex files.
Nadine completed her apprenticeship and achieved an SVQ in Office Admin.  She became a confident employee and
gained new skills.  She has since secured an Office Administrator job within another department within North
Ayrshire Council.  Her Advisor continues to support with new office duties including inventory of property and
answering a busy telephone enquiry line and she provides this support one morning per week.  Nadine continues to
gain new skills including customer service in her new role.  One of her new tasks is the responsibility for petty cash,
however as Nadine does not have any experience using money, her Advisor requested additional support from North
Ayrshire Council’s Community Development Tutor to provide numeracy tutoring.  Nadine‘s confidence continues to
grow from strength to strength and her Advisor has formed an excellent relationship with her manager keeping in
touch with both on a regular basis.  Nadine ‘s Advisor also works closely with Nadine’s parents ensuring that they are
kept informed of all the support being provided to Nadine. 
“We were introduced to ' Equal' through Nadine’s school to offer support in her transition
from school to the workplace. This is a big step for any school leaver but particularly for
someone with Autism like Nadine. Not forgetting that this had been a very uncertain time
and home schooling was now happening.
Equal have been an amazing source of support for not only Nadine but also for us as
parents. They built a relationship with Nadine through video chats and were very focused on
her as an individual. This was then followed on to provide support within the workplace
when Nadine first started her apprenticeship. So valuable for both Nadine and her
workplace.  A new environment, learning a brand new job and meeting new people can be
very overwhelming for most and it was a lifeline for Nadine having someone she knew to
offer support.” – Nadine’s Mother.
(*Name has been changed.) 
118

Page 119

Page 31 of 37
Equality Outcomes
Sub-Outcome 3B - To continue to embed UNCRC across schools in North Ayrshire
to eliminate discrimination and promote equality of opportunity in our schools
and the wider community
Rights Respecting Schools
The UNICEF UK Rights Respecting Schools Award (RRSA) supports schools across the UK to embed the United Nations
Convention on the Rights of the Child (UNCRC) into their ethos practice and culture.  The output from taking this
work forward is that all schools across North Ayrshire would be registered as a Rights Respecting School.  This
approach would lead to the embedding of children’s rights across the curriculum and within child protection and
additional support needs practices.  
3.3 Key actions supporting this Outcome
• Support the embedding of children’s rights across the curriculum and within Child Protection and Additional
Support Needs practices.
Progress
Over 90% (92%) of schools have embarked on the RRSA journey within North Ayrshire Council.  This compares
extremely favourably to the national picture of 68% of all Scottish schools involved in the RRS programme.
A very small percentage have not engaged in the program (8%, four schools) but all continue to promote rights
through their vision values and aims and Additional Support Needs work.  Key results include:
• An increase in schools achieving Bronze Status - 25% (13 schools) are at Bronze level. 
• An increase in schools achieving Silver Status - 48% (25 schools) are at Silver Status, an increase of 2 schools
since our 2020 report.*
• An increase in Schools achieving Gold Status  - 19% (10 schools) are at Gold Status; an increase of 6 schools
since our 2020 report.  
*This figure is offset with the increase from four to 10 schools achieving the Gold award.
A high number of schools are approaching reaccreditation, UNICEF charge to submit for reaccreditation, which has
now been made easier due to funding provided by the Scottish Government until 2024.
Children’s Rights and Child Protection and Additional Support Needs
Children and young people’s rights are recognised in line with revised child protection and additional support needs
legislation.  All schools in North Ayrshire would recognise these processes and build in the ‘young person’s voice’ in
child protection and additional support needs planning.  This is reflected in Article 12 of the UNCRC.
3.4 Key Actions Supporting this Outcome
• Implement the Children and Young People’s voice in Child Protection and Additional Support Needs planning
• Respect for the views of the child (Article 12 of the UNCRC:  ‘Children and Young People have the right to
speak up and have their opinions listened to and be taken seriously.’) 
Through this aim of capturing and reflecting the ‘young person’s voice’ employees have been engaging with young
people through additional support needs (ASN), child protection and young carers meetings.  All teams are aware of
the need to reflect the voice of the child or young person in realisation of Article 12 UNCRC.  A variety of voice
gathering tools have been developed through our nurture approach including nurture bricks approach for primary
and a pupil voice template for secondary.  These in addition to those tools found in the national practice model.
119

Page 120

Page 32 of 37
Equality Outcomes
Progress
Almost all, 90% plus of children, have their voice recognised in decisions affecting their lives, this is a key measure
around ensuring children have had the chance to input into decisions affecting their lives.
All additional support for learning child and young people plans sampled contain the views of our children and young
people.  This process is also reflected in child protection planning for children and young people.
Education continues to work closely with the Health and Social Care Partnership (HSCP) to strengthen this still
further and through revised child protection practice as a result of the Inspection of Children’s Services.
The voice of our children and young people is part of educational policy development through a process of realising
Children’s Rights. 
Mentors in Violence Prevention 
Mentors in Violence Prevention (MVP) is a peer mentoring programme that gives young people the chance to
explore and challenge the attitudes, beliefs and cultural norms that underpin gender-based violence, bullying and
other forms of violence.
3.5 Key Actions Supporting this Outcome
• Establish the Mentors in Violence Programme in two secondaries, followed by further secondaries. 
Progress
From an initial target of two schools participating in the Mentors in Violence Programme (MVP) programme, eight
out of nine secondary schools are now taking part in MVP during 22/23. 
Over 60 employees have been trained and over 200 young people in North Ayrshire are MVP mentors delivering
learning to hundreds of young people in our schools.  Mentors are developing leadership, exploring violence through
a gendered lens, using a bystander approach, exploring the scope of violent behaviour and challenging victim
blaming.
Employees and mentors are working together to increase communication and to our young people in becoming
active by-standers.  Leadership accreditation is being sought in several schools using MVP as evidence of these skills
in action.
Early indications from schools show that mentors are confidently delivering lessons to junior classes.  There is a
greater shared understanding of issues related to gender-based violence and bullying.  The programme has been
welcomed in all participating schools. 
Sub-outcome 3C - Our young LGBT people feel supported and have access to
improved digital platforms and sources of support.
3.6 Key actions supporting this Outcome
• Create digital space for our young people who identify as LGBT with support staff to support LGBT and
separate space for trans young people.
• Regular digital support and information sessions with information and guest speakers for both our young
people and parents and carers
120

Page 121

Page 33 of 37
Equality Outcomes
• Connected Communities (Youth) have signed up to achieve the LGBT Silver Charter Mark – which includes
specific LGBT Awareness and Trans Awareness training for all staff.  
• Regular Social Media content that shares support and resources for LGBT+ through all our social media
channels – linking into local and national support. 
Progress
The Connected Communities Team has submitted evidence to LGBT Youth Scotland for the Silver LGBT Chartermark. 
The Chartermark asks organisations to focus on inclusion in relation to LGBT issues and covers aspect of training and
awareness raising and policy and practice within organisations.  Planning and facilitation of employee information
sharing twilight sessions have taken place which aims to improve inclusive practice across our Council’s Connected
Communities Team.  
As part of the work towards submitting evidence, a group of employees volunteered to provide support to the LGBT
Silver Charter Mark Journey.  The group have been meeting quarterly to discuss LGBT support within each of the
North Ayrshire localities and feed this back into an LGBT Action Plan.  The group has representatives from each
locality and from the Modern Apprenticeship Programme.  They have been instrumental in providing evidence and
support for the LGBT Silver Charter Portfolio
North Ayrshire now has four active LGBTQI Youth group provisions that meet weekly in the Garnock Valley,
Kilwinning, North Coast and Irvine.  Members of the group have been proactive in participating in a range of
activities, including, 
• In the North Coast, 10 Young people ran an LGBT bake sale to make LGBT issues more openly discussed in
the secondary school.  Open discussions with campus officers were held to discuss ‘dead naming’ (calling a
transgender person by their birth name after they changed their name due to their gender transition) and
putting pronouns on registration forms.
• In Kilwinning, seven young people worked on an LGBT basic 'introduction to (LGBT) terms' leaflet that will be
displayed in Kilwinning library.
• The Garnock Valley group started in April 2022, with eight regular attendees, and attended the Arran Pride
event in July.  Although numbers have reduced since then, work continues to keep the group active.
Our Council continues to support awareness of LGBT History month.  A full LGBT campaign was created throughout
February that was pushed out though all of our social media channels.  This included national signposting, promotion
of the LGBTQI Youth Group and promotion of Hate Crime Reporting, mental health support and more.  Our Council
also supported the first Arran Pride event that took place in July 2022 and will continue to support this event moving
forward. 
Sub-outcome 3D - Support the integration of our refugee population into life in
North Ayrshire.
3.7 Key actions supporting this Outcome
• Create refugee-led groups at a local level.
• Enable collective identification of issues and engagement with services.
• Build knowledge and skills for organisational development such as governance, employing staff, asset
transfer and registering as a charity.
• Assess and meet the needs of refugee community members.
121

Page 122

Page 34 of 37
Equality Outcomes
• Facilitate the participation of refugees in forums as well as other activities of local authorities and other
public bodies.
Progress
A refugee lead community group called the Spike Wheat Scots, has been set up and hosts a community hub from
Whitehurst Park community centre in Kilwinning.  The group is now a key holder at the premises and the Community
Learning and Development (CLD) new Scots team, other Council services, external organisations and volunteers all
help to support the delivery of the group.  
A Ukrainian guest led community group has been set up and hosts a community hub from Cranberrymoss
community centre in Kilwinning and is supported in a similar manner to the Spike Wheat Scots group.  The group has
engaged with the Department of Work and Pensions to provide a weekly drop in for Ukrainian guests, supporting
them with employability issues.  A programme of activities has been developed, including input from Police Scotland,
information sessions on Halloween and Guy Faulks night and supporting the group with governance.
The CLD team support refugee youth activities including a girls Duke of Edinburgh group, a boys group, girls football,
boys football, SWANS (girls only youth group), and dance group in partnership with Y-Dance and we have one refugee
who was voted in as a member of the Scottish Youth Parliament.  Through the Spike Wheats Scots group an adults
football group is now running as well.  We are in discussions with the Scottish Football Association and Street Soccer
regarding coaching qualifications and games.
The CLD New Scots team currently has one refugee as a core member of staff.  They also have one refugee and three
Ukrainian guests on their sessional employee list.
A language café is hosted monthly that brings together all our New Scots to help them improve their spoken English
and engage with other New Scot learners.  In partnership with East and South Ayrshire as part of the Pan Ayrshire
English for Speakers of Other Languages (ESOL) working group we are piloting a language learning platform and
generating content and really promoting independent learning including the ESOL and other organisations including
the Perth, Yemeni community.  We are also in the final stages of being able to offer a community interpreting
qualification.
Future work includes a joint bid with ‘Think Outside the Box’ that has been submitted to the National Lottery to work
on a woman’s only project specifically targeting Arabic women.   
Equality Outcome 4 – In Ayrshire public bodies will be inclusive and diverse
employers 
Sub-Outcome 4A - Our BAME, disabled and LGBT+ employees have safe and
supportive work environments to thrive, and we are seen as an employer of
choice 
4.1 Key actions supporting this Outcome
• Explore with colleagues the desire to establish a Black and Minority Ethnic (BAME) employee network either
locally or with employees from South and East Ayrshire Council.
• Following the successful introduction of an Employee Disability Forum, explore with the workforce the desire
to establish an employee LGBT+ staff network.
122

Page 123

Page 35 of 37
Equality Outcomes
Progress
During 2022, colleagues from North, South and East Ayrshire Council areas collaborated on an approach to establish
a Black and Minority Ethnic (BAME) employee forum.  The partners felt that due to the relatively low number of
minority ethnic employees across all organisation, (0.83% of total workforce for North Ayrshire in our last report),
creating a combined group across the three Ayrshire Local Authorities would make the group viable.  
The main aim of the group was to establish a safe and supportive environment for employees from a BAME
background that would also act as a consultative forum to help inform Council processes.  The group has had three
meetings between June – December 2022 and is still in its forming stage.  Of the 18 employees involved, three were
Equality Officers from each of the three Council areas, one Human Resource Officer and an EIS Union representative,
both from North Ayrshire.  Of the remaining number, 10 employees were from North Ayrshire, two from South
Ayrshire and one from East Ayrshire.  At the second meeting a chairperson was nominated from within the group
and draft Terms of Reference were considered.  General feedback was that the Terms of Reference required further
work to make them more focused on the needs of the group and a group member agreed to do some further
research which will be progressed during 2023.  
The establishment of an LGBT+ forum has been delayed until 2023/24 to ensure the BAME forum is well established.  
4.2 Key Actions Supporting this Outcome
This action is around recognising the benefits of a more diverse and inclusive organisational culture and determining
how and where we advertise our vacancies to ensure best coverage and access to everyone within our communities.
The key action is: 
• Contact specialist organisations to seek opportunities to advertise our vacancies to a more diverse range of
candidates.
Progress
Vacancies for positions within the Council are advertised through the MyJobScotland website, which is the national
shared recruitment portal for Scotland’s 32 local authorities, the Scottish Fire and Rescue Service and Further and
Higher Education Institutes.  Although this is generally an accessible platform, concerns have been raised nationally
at groups such as the Scottish Council Equality Network that some individuals across Scotland might not be aware of
or necessarily have the required skills to apply for a position using this platform.  
To help expand the promotion of Council vacancies to as wide an audience as possible, our North Ayrshire Council
vacancy portal is now promoted on the Care and Support North Ayrshire (CARENA) site.  The CARENA site provides a
range of information on accessing care services, community groups, employability and self-directed support.  This is
in addition to promotion through social medic platforms such as Linked in and Facebook.  
Our Employability team liaises with specialist partners such as CEIS Ayrshire, who are an organisation that focus on
creating a more inclusive economy and support individuals, communities, businesses and prospective candidates
throughout North Ayrshire and across Scotland.  
Information provided by our Council Resources team show a spread of applicants across various platforms (Table 1
below), however by far the highest number of applications was directly via the MyJobScotland Portal.  This is not
unexpected, as it is the main platform for the public sector.  Further work will be carried out to determine if
information can be gathered by protected characteristic by platform to determine if there are any trends in how
people are seeking a position within our Council.  Although the table below highlights where people are viewing
adverts, these will direct the applicant to the MyJobScotland portal, where they will be required to go through the
form on the portal; for some applicants, completing the form itself may be challenging and wider support
mechanisms on the completion of the form may be a future consideration for public sector organisations.  
123

Page 124

Page 36 of 37
Equality Outcomes
Table 1 Number of Applicants per platform (snapshot Q3 2022)
Source July August Sept Total
CARENA Website 0 1 3 4
Facebook 12 44 21 77
LinkedIn 11 9 8 28
MyJobScotland
(directly/alerts) 834 1913 1623 4370
Newspaper/journal 0 1 1 2
Poster 0 2 1 3
Radio 0 1 0 1
Twitter 4 1 3 8
Word of Mouth 115 276 208 599
Other 56 132 111 299
Total  1032 2380 1979 5391 
Equality Sub-Outcome 4B - Enhanced opportunities for people with
communication difficulties to fully express their skills, personality and ability as
part of the application process for employment and skills development
programmes.
Key Actions Supporting this Outcome
• Pilot the See Me CV initiative with Modern Apprentice roles and review to potentially open across the
Council for all disabled individuals.
• Following successful pilot of the See Me CV Scheme we will consider the longer term roll out of the
programme.
Progress
The See Me CV process was initially set up through the Equal Supported Employment programme in order for clients
with disabilities to show their capabilities, skills and a flavour of their personality behind the CV that would hopefully
see employers invite them to interview.  This online process would support the written CV, especially for people who
are not always confident about expressing themselves on paper.  
The See Me CV Programme was introduced to our Council in 2022 and has become a permanent feature of the
Modern Apprentice Programme.  It also provides recruiting managers a flavour of the applicant’s personality.  There
continues to be steady uptake on the See Me CV where applicants feel this alternative route would be helpful.  
In support of this programme, all Recruiting Managers are fully briefed on the programme and how this should be
implemented in practice.  In addition, guidance is available for all candidates on what is required and where to
access supports if needed.  
124

Page 125

Page 37 of 37
Equality Outcomes
Equality Sub-Outcome 4C - Our understanding of race employment issues is
improved to ensure we maintain robust employment practices
Key Actions Supporting this Outcome
• Review of recruitment procedures to adopt an anonymised statement process prior to interview.
• Review the ‘My Connections’ videos for diversity content.
• Encourage North Ayrshire Council employees to update their personal HR records.
• Carry out an organisational assessment of race and racism.
• Review our Equality training around Race in conjunction with Scottish Government Guidelines.
Progress
Current recruitment procedures through the MyJobScotland portal mean that interview panels do not get to see any
personal demographic information of the applicant and only the information directly on the application form,
including the applicant’s name is visible.  COSLA who own the MyJobScotland portal, are aiming to create a feature
within the process that would allow the application to remain completely anonymous.  
The ‘My connections’ videos are short videos of our employees explaining their views on working for our Council. 
These have been reviewed with some updates to try and reflect more of the diversity of our workforce.  A video of
our Sensory Impairment Manager, who is registered blind, has been loaded onto the Council’s MyJobScotland portal. 
Further work is required to continue to encourage other employees from diverse backgrounds to share their
experience of working for our Council.  This will continue into 2023/24.  
The Human Resources team carried out an exercise to encourage employees who had not updated their personal
records to do so on our systems.  During Autumn/Winter 2021, 900 employees were asked to complete an Equal
Opportunities Survey, encouraging them to update their ethnicity and disability status on the HR records system. 
The communication explained the importance of holding accurate employee data and ensured employees are fully
aware of the requirements as to why the Council holds this data.  The survey was positively received, with 350
employees updating their records.  This increase in employees updating their records led to a fall in the % not
disclosing, in turn this provides more confidence when analysing the data.  It was agreed that this exercise would be
repeated every two years and other protected characteristics would be considered.  
In 2022, the Ayrshire Equality Partnership commissioned the Coalition for Ethnic Minority Voluntary Organisations
(CEMVO) to deliver Cultural Awareness training for the partners.  The training covered national and local statistics
for ethnic minority groups, concepts such as unconscious bias, institutional racism and engaging with ethnic minority
communities.  Following the training the partners are considering an approach to develop in-house awareness
training and also reflect shared knowledge and training following a wider scoping exercise carried out by the Scottish
Council Equality Network.  
125

Page 126

Page 38 of 37
For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000 Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
126

Page 127

Eq ualities Mainstreaming and
Outcomes Report
Appendix 2
Employee Statistics 2021 and 2022
127

Page 128

To view the Equalities Mainstreaming and Outcomes Report Employee Statistics, please click here.
128

Page 129

For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000 Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
129

Page 130

130

Page 131

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Appointment of Older People’s Champion 
Purpose:  To consider the appointment of an Older People’s Champion
following the resignation of the previous representative. 
Recommendation:  To agree a replacement Member as Older People’s Champion. 
1. Executive Summary 
1.1 The Cabinet on 7 June 2022, appointed Elected Members as Champions in a number
of areas, namely Carers, Young People, Veterans, Mental Health and Older People. 
1.2 A vacancy has arisen for the role of Older People’s Champion. This report recommends
that Cabinet considers appointing another Elected Member as Older People’s
Champion following the resignation of the previous representative, Councillor Donald L.
Reid. 
2. Background 
2.1 The rationale for the creation of a Champion position recognises the specific needs
and wishes of communities with special interests across North Ayrshire. These
communities span geographical boundaries and, often, portfolio briefs. It is therefore
important that individuals and communities with special interests have a clear conduit
into the Council along with an identified Elected Member who will act as an
Ambassador and Advocate for them. 
2.2 The role of Older People’s Champion has become vacant following the resignation of
Councillor Donald L Reid. Appointing another Councillor to the role will ensure that
there is an Elected Member in place as the named advocate to support, listen to and
understand the needs of older people across the full range of Council services. The
role of the Champion is to work with groups of citizens to understand their needs and
to advocate on their behalf in relation to how services are delivered. 
3. Proposals 
3.1 It is recommended that Cabinet approves the appointment of another Elected Member
as the Older People’s Champion. 
Agenda Item 7
131

Page 132

4. Implications/Socio-economic Duty 
Financial 
4.1 None arising from this report. 
Human Resources 
4.2 None arising from this report. 
Legal 
4.3 None arising from this report. 
Equality/Socio-economic 
4.4 The appointment of Champions supports the Council’s equalities work. 
Climate Change and Carbon 
4.5 None arising from this report. 
Key Priorities 
4.6 The appointment supports the Council’s strategic priorities which underpins delivery of
the Council Plan. 
Community Wealth Building 
4.7 Not applicable. 
5. Consultation 
5.1 Consultation has taken place with Elected Members. 
Aileen Craig
Head of Democratic Services 
For further information please contact Craig Stewart, Committee Services Officer , on
01294 324130 email: craigstewart@north-ayrshire.gov.uk 
Background Papers
--
132

Page 133

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Revenue Budget 2022/23 : Financial Performance to 31
March 2023 
Purpose:  To advise Cabinet of the financial performance for the Council
for 2022/23. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial outturn position outlined
in the report; 
(b) approve the earmarking of £3.524m identified at 2.5 to
meet future year commitments;
(c) note the transfer of the net in-year underspend of £1.524m
to support the Roads Maintenance budget and the Energy
Smart scheme, as approved by Council;
(d)  note the financial performance of the Health and Social
Care Partnership highlighted at 2.6; 
(e)  note the deficit position of KA Leisure; 
(f)  note the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2022/23 were approved by Council on 2
March 2022. The Housing Revenue Account (HRA) Revenue Budget for 2022/23 was
approved by Council on 16 February 2022. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the final report for 2022/23 and covers the period to the end of March
2023 (Period 12). This is the final financial performance information on which the
annual accounts for the Council will be prepared. 
1.3   At Period 12 the General Fund is reporting a net in-year underspend of (£1.524m),
(0.4%), after transferring resources to/from earmarked reserves. This is an increase of
(£0.601m) from that reported at Period 10 and is primarily related to cost reductions
arising from industrial action by teaching staff during February and March 2023. As
approved by Council on 1 March 2023, £1.000m of this underspend will be utilised to
supplement the Council’s Roads Maintenance Programme for 2023/24 with the
balance utilised to support the Energy Smart scheme.
Agenda Item 8
133

Page 134

1.4  The Housing Revenue Account is reporting a net in-year breakeven position, after
transferring resources to/from earmarked reserves. This is a movement of £0.239m
from the underspend reported at Period 10. The movement is primarily related to
increased Bad Debt Provision, revised Capital Charges and the under recovery of
Recharge income. This has been offset by a draw on HRA Balances. 
1.5  At Period 10 the Health and Social Care Partnership reported a projected underspend
of (£1.181m) and work is ongoing to confirm the final outturn position for the year, the
HSCP awaits final confirmation of the NHS budget outturn. It is anticipated that the
Integration Joint Board (IJB) will carry forward this underspend reserves for use in
future years, resulting in an in-year net breakeven position for the HSCP. 
1.6 KA Leisure has yet to finalise their year-end position. However, a net trading deficit is
anticipated for 2022/23 and funding to support a breakeven position will be drawn
from previously approved earmarked funds. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2022/23. In addition to the budget approved
on 2 March 2022, earmarked funds of £31.875m were carried forward from 2021/22
for service expenditure in 2022/23 and are reflected in the figures within the 2022/23
financial performance reports as they are drawn down. 
2.2 The reported net in-year underspend is (£1.524m), net of transfers to/from reserves.
This represent 0.4% of the Council’s total General Fund revenue budget. As approved
by Council on 1 March 2023, £1.0m of this underspend will be earmarked for the
Roads Maintenance budget in 2023/24 and the balance will be applied to support the
Energy Smart scheme.  
134

Page 135

2.3 The following table details the final position on a service by service basis: 
2.4 The reported Aggregate External Finance within Planned Income includes a number
of adjustments to Scottish Government funding from that reported at Period 10, as
detailed in the following table: 
App.
No
Annual
Budget
Actual
Outturn to 
31 March
2023
Variance
for year
(Fav)/Adv
Projected
Variance
at P10
(Fav)/Adv
Movement Request
for Carry
Forward
Approved
@ P10
New
Requests
for Carry
Forward
Variance
for Year
After Carry
Forward
(Fav)/Adv
Service Expenditure £000's £000's £000's £000's £000's £000's £000's £000's
Chief Executive's 1    26,560     25,702        (858)       (394)       (464)        233         327          (298)
Communities 2  176,746   171,407     (5,339)    (3,222)    (2,117)     2,184      1,419       (1,736)
Place 3    54,485     55,384         899      2,196     (1,297)        286         645        1,830
Other Corporate
Services 4    18,441     15,407     (3,034)    (3,199)        165         959      1,133          (942)
Sub Total  276,232   267,900     (8,332)    (4,619)    (3,713)     3,662      3,524       (1,146)
Health and Social
Care Partnership  120,549   120,549             -             -             -             -             -               -
Balance for Services  396,781   388,449     (8,332)    (4,619)    (3,713)     3,662      3,524       (1,146)
Financing Charges 5    20,077     20,077             -             -             -             -             -               -
Contribution to Loans
Fund Reserve 5     7,125      7,125             -             -             -               -
Total Planned
Expenditure  423,983   415,651     (8,332)    (4,619)    (3,713)     3,662      3,524       (1,146)
Planned Income
Aggregate External
Finance 5 (348,966) (348,950)          16             -           16             -             -            16
Council Tax 5   (61,595)   (61,989)       (394)          34        (428)            -             -          (394)
Contribution to Capital
Fund 5        161         161             -             -             -             -             -               -
Contribution to/from
Earmarked Funds 5   (13,583)   (13,583)            -             -             -             -             -               -
Total Planned Income (423,983) (424,361)       (378)          34        (412)            -             -          (378)
-     (8,710)    (8,710)    (4,585)    (4,125)     3,662      3,524       (1,524)Net Expenditure/ (Income)
Non Domestic
Rates
Specific
Grants TOTAL AEF
£000's £000's £000's
Revised Budget 31 January 2023 (288,560)       (37,512)         (21,259)         (347,331)      
Movements:
Scottish Child Bridging Payments (additional) (28)               (28)              
22/23 Teachers Pay Award (1,751)           (1,751)          
DHP Accrual (373)             (373)            
PEF Carried Forward to 23-24 442              442             
CJSW Funding Adjustment 75                75               
Final Scottish Government Income (290,712)       (37,512)         (20,742)         (348,966)      
General Revenue
Grant
£000's
135

Page 136

2.5 Commentary on Significant Movements from the Approved Budget 
Detailed explanations of the significant variances in service expenditure compared to
the approved budgets, together with information on funding to be carried forward to
support expenditure during 2023/24, are provided in appendices 1 to 5 to this report.
A full list of the proposed carry forward of earmarked funds is included at Appendix 5.   
A brief explanation of the significant movements for each service since Period 10 is
outlined as follows: 
(i) Chief Executive’s – underspend of (£0.858m), an increase of (£0.464m) from
the previously reported underspend. 
The movement since Period 10 is primarily related to: 
• Reduced Sheriff Officers’ commission costs, (£0.180m); 
• Reduced expenditure on LAN and software licenses, (£0.052m); and
• Vacancy management across services, (£0.073m). 
It is requested that £0.327m of the projected underspend is earmarked to support
anticipated additional expenditure in relation to the Scottish Welfare Fund, based
on current levels of demand continuing into 2023/24. 
(ii) Communities – underspend of (£5.339m), an increase of (£2.117m) from the
previously reported underspend. 
The movement since Period 10 is primarily related to: 
• Additional impact of industrial action by Teachers, (£0.486m);
• Net teaching and non-teaching staff turnover, (£0.478m);
• Lower than anticipated expenditure across Connected Communities Supplies &
Services and Third Party Payments, (£0.327m);
• Lower than anticipated expenditure on Early Learning and Childcare funded
providers due to a lower than anticipated uptake of places, (£0.200m);
• Reduced expenditure on residential childcare placements, (£0.170m);
• Increased Facilities Management Income, (£0.125m); and
• Lower than anticipated expenditure on Cost of the School Day, (£0.065m). 
It is requested that a further £1.419m is earmarked to support anticipated additional
expenditure during 2023/24, including: 
• Classroom Assistant workforce review as part of the Supporting Needs national
review process, £0.600m; 
• Additional funding to support Ukrainian Resettlement teaching costs, £0.259m,
and Youth modern Apprentices, £0.038m;
• Essential boiler and pool plant investment at Auchenharvie pool, £0.258m;
• The ongoing implementation of the expansion of ELC to 1140 hrs to help address
future funding reductions, £0.200m; and
• Additional Cost of the School Day funds due to delays in procurement process
for purchase of clothing stock for uniform exchanges in schools, £0.064m; 
136

Page 137

Virements in relation to the realignment of Information and Culture budget lines
have been included within Appendix 7. 
(iii) Place – overspend of £0.899m, a reduction of (£1.297m) from the previously
reported overspend. 
The net movement since Period 10 is primarily related to: 
• Lower expenditure on gas and electricity, (£0.426m);
• Increased income across Planning and Building Control, (£0.352m);
• Lower expenditure on temporary accommodation furniture and fittings and
repairs, (£0.187m);  
• Revised General Fund Housing arrears and bad debt provisions, (£0.157m);
and
• Lower expenditure in relation to the Rapid Rehousing Transition Plan, (£0.107m). 
These have been partly offset by additional recharges in relation to Sheltered
Housing Unit community hubs, £0.233m. 
It is requested that a further £0.645m is earmarked to support anticipated
additional expenditure during 2023/24, including: 
• Provision for outstanding Covid related leave entitlement within Waste Services
to fund backfill arrangements, £0.177m;
• Support for delayed furniture and fittings purchases across Temporary
Accommodation properties £0.117m and £0.173m in relation to the Rapid
Rehousing Transition Plan linked to the 5 year RRTP delivery programme; and
• Funding to support the Local Heat & Energy Efficiency Scheme, £0.075m, and
Trading Standards and Economic Regeneration staffing, £0.080m. 
In addition, a £0.023m underspend in Largs Car Park will be ring fenced to
support Largs Car par activities. 
Virements in relation to the realignment of income budgets within Roads,
Regeneration and PMI have been included within Appendix 7. 
(iv) Other Corporate Items – underspend of (£3.039m), a reduction of £0.165m
from the previously reported underspend. 
The movement since Period 10 is primarily related to the in-year settlement of
outstanding HSCP debt, £0.834m, partly offset by a range of centrally held funds
which have not been fully utilised in year, (£0.661m). 
It is requested that a further £1.133m is earmarked to support anticipated additional
expenditure during 2023/24, including: 
• Provision for contractual electricity and gas prices following recent notification
of pass through costs from energy providers for 2023/24, £0.870m;
• Contribution to Loans Fund Reserves to address ongoing significant cost
pressures in the Capital Programme, £0.512m;
137

Page 138

• Provision for the review of Democratic Services’ structures linked to workload
pressures, £0.250m;
• Business continuity resilience infrastructure to ensure provision across
localities, £0.100m;
• Scottish Government Funding not fully utilised in year, £0.156m
• Previously approved budget allocation to support future service delivery in
relation to the CCTV Review, £0.050m; and
• Essential repairs to Irvine Harbour property, £0.029m. 
(v) Council Tax – overrecovery of (£0.394m), a movement of (£0.428m) from the
previously reported underrecovery. 
The movement since Period 10 is primarily related to an adjustment to the
historical contribution to the Affordable Housing Reserve. 
Health and Social Care Partnership 
2.6 The final HSCP financial performance report for the year will be presented to the
Integration Joint Board on 15 June 2023 and will outline the 2022/23 financial
performance in more detail. At Period 10 the HSCP reported a projected underspend
of (£1.181m) and work is ongoing to confirm the final outturn position for the year, with
the HSCP awaiting final confirmation of the NHS budget outturn. It is anticipated that
the IJB will carry forward this underspend in reserves for use in future years, resulting
in an in-year net breakeven position for the HSCP. The IJB supported in March 2023
as part of the 2023-24 budget approval, the earmarking of the 2022-23 in-year
underspend to be held in a reserve to support service transformation to assist with the
delivery of future efficiencies and cost reduction, including the costs associated with
future Voluntary Early Release (VER) of staff. During 2022/23, £2.320m, set aside by
North Ayrshire Council, has been applied to make full and final repayment of the IJB’s
deficit to the Council. 
Housing Revenue Account 
2.7  The Housing Revenue Account budgeted for a breakeven position in 2022/23. A net
in-year breakeven position, net of transfers to/from reserves, has been reported. This
is a movement of £0.239m from the previously reported underspend position and is
summarised in the following table with further details provided in Appendix 6. 
138

Page 139

2.8 Commentary Significant Movements from the Revised Budget 
Detailed explanations of the significant variances in expenditure compared to the
approved budgets are provided in appendix 6 to this report. 
A brief explanation of the significant movements for each service since Period 10 is
outlined as follows: 
(i) Property Costs – overspend of £1.683m, an increase of £0.122m from the
previously reported overspend 
The movement is primarily related to increased expenditure on:
• Responsive Repairs, £0.129m;
• Void Repairs, £0.233m; and 
• Other Property Costs, £0.215m, which is primarily related to Sheltered Housing
utilities.
These have been partly offset by reduced expenditure on Planned and Cyclical
Maintenance, (£0.427m). 
(ii) Administration Costs – underspend of (£0.341m), an increase of (£0.258m)
from the previously reported underspend 
The movement is primarily related to lower than anticipated expenditure on
Central Support Costs, £0.177m. 
(iii) Third Party Payments – overspend of £0.210m, an increase of £0.061m from
the previously reported overspend 
The movement is primarily related to an increase in Housing Asset and
Investment recharges, £0.086m. 
Annual
Budget
Actual
Outturn to 
31 March
2023
Variance
for year
(Fav)/Adv
Projected
Variance
at P10
(Fav)/Adv
Movement Note
£000's £000's £000's £000's £000's
Employee Costs      5,300       5,290           (10)             -           (10)
Property Costs     18,850      20,533       1,683       1,561          122 (i)
Supplies & Services         451          374           (77)        (120)           43
Transport Costs           34            16           (18)          (10)            (8)
Administration Costs      1,881       1,540         (341)          (84)        (257) (ii)
Third Party Payments      2,550       2,760          210          149            61 (iii)
Transfer Payments         155          136           (19)             -           (19)
Other Expenditure         368          836          468           (36)         504 (iv)
Capital Financing Costs     25,264      23,527      (1,737)     (2,068)         331 (v)
Gross Expenditure     54,853      55,012          159         (608)         767
Income    (54,853)    (54,038)         815          369          446 (vi)
Utilisation of Reserves             -         (974)        (974)             -         (974) (vii)
Income    (54,853)    (55,012)        (159)         369         (528)
Net Expenditure             -              -              -         (239)         239
139

Page 140

(iv) Other Expenditure – overspend of £0.468m, a movement of £0.504m from
the previously reported underspend 
The movement is primarily related to increased provision of Bad Debts, £0.497m. 
(v) Capital Financing Costs – underspend of (£1.737m), a reduction of £0.331m
from the previously reported underspend 
The movement is primarily related to revised loan charges reflecting expenditure
on the HRA Capital Programme. 
(vi) Income – underrecovery of £0.815m, an increase of £0.446m from the
previously reported underrecovery
The movement is primarily related to the under recovery of Recharge Income
£0.397m. 
(vii) Utilisation of Reserves – overrecovery of (£0.974m), an increase of
(£0.974m) from the previously reported position
The movement is related to the drawdown of £0.974m from earmarked reserves
to offset the reported overspend across the HRA. 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a) note the information and financial outturn position outlined in the report; 
(b) approve the earmarking of £3.524m identified at 2.5 to meet future year
commitments;
(c) note the transfer of the net in -year underspend of £1.524m to support the Roads
Maintenance budget and the Energy Smart scheme, as approved by Council;
(d) note the financial performance of the Health and Social Care Partnership
highlighted at 2.6; 
(e) note the deficit position of KA Leisure; 
(f) note the drawdown of HRA reserves identified at 2.7; 
(g) note the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The final outturn position for the year is an underspend of (£1.524m) which will be
applied to support the Roads maintenance budget and the Energy Smart scheme as
approved by Council. 
Housing Revenue Account
The final outturn position for the year is a net breakeven position after the draw down 
of HRA earmarked reserves. 
Human Resources 
4.2 None.
140

Page 141

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2022/23 : Financial Performance to 31 January 2023 - Cabinet 21 March
2023
141

Page 142

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive's Office
Chief Executive's Office 147              156              9                     6%
Total for Chief Executive's Office 147              156              9                     6%
Financial Services
Change Programme 109              109              -                      0%
Audit, Fraud, Safety & Insurance 703              675              (28)                  (4%)
Corporate Procurement 1,080           910              (170)                (16%) 1         
Financial Services 1,533           1,487           (46)                  (3%)
Revenues (289)             (462)             (173)                60% 2         
Transformation 745              753              8                     1%
Total for Financial Services 3,881           3,472           (409)                (11%)
People & ICT
Employee Services 999              981              (18)                  (2%) 3         
HR & Organisational Development 1,207           1,205           (2)                    (0%)
ICT 5,777           5,547           (230)                (4%) 4         
Business Support 1,537           1,537           -                      0%
Customer Services 8,623           8,645           22                   0% 5         
Total for People & ICT 18,143         17,915         (228)                (1%)
Democratic Services
Legal & Licensing 745              705              (40)                  (5%)
Policy, Performance & Elections 489              407              (82)                  (17%) 6         
Communications 493              473              (20)                  (4%)
Civil Contingencies 60                57                (3)                    (5%)
Committee Services 782              755              (27)                  (3%)
Member Services 1,309           1,293           (16)                  (1%)
Ayrshire Area Support team 59                59                -                      0%
Information Governance 452              410              (42)                  (9%)
Total for Democratic Services 4,389           4,159           (230)                (5%)
Totals 26,560         25,702         (858)                (3%)
Less Proposed Carry Forwards 560              560                
Net Total 26,560         26,262         (298)                (1%)
142

Page 143

Appendix 1
Subjective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 17,652         17,324         (328)                (2%)
Property Costs 70                94                24                   0%
Supplies and Services 3,151           2,876           (275)                (9%)
Transport and Plant Costs 32                18                (14)                  (44%)
Administration Costs 1,470           1,190           (280)                (19%)
Other Agencies & Bodies 7,242           7,304           62                   1%
Transfer Payments 889              889              -                      0%
Other Expenditure 72                72                -                      0%
Capital Financing -                   -                   -                      -
Gross Expenditure 30,578         29,767         (811)                (3%)
Income (4,018)          (4,065)          (47)                  1%
Net Expenditure 26,560         25,702         (858)                (3%)
143

Page 144

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Budget
£000 
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement : There have been no significant movements since P10
1,008 (141) -14% Employee Costs - There is an underspend of £0.141m due to vacancy management.
(50) (35) 69% Income - There is an over recovery of £0.035m due to increased rebates.
5 Other minor variances
(170)
Finance - Revenues
Movement - There has been a favourable movement of £0.180m from P10 mainly due to the Sheriff Officer
Commission.
7 (162) -2314% Sheriff Officer Commission - £0.162m underspend due to release of accrual which is no longer required under the new
agreement terms.
(11) Other minor variances
(173)
Note 3 People & ICT - Employee Services
Movement : There have been no significant movements since P10
940 (8) -1% Employee Costs - There is an underspend of £0.008m due to vacancy management.
(10) Other minor variances
(18)
Note 4 People & ICT - ICT
Movement - There has been a favourable movement of £0.052m from P10 primarily due to underspends on LAN and
software licences.
2,307 (206) -9%
Supplies and Services - There is an underspend of £0.206m in software licences due to some contracts not being
renewed and national delays in procuring a collective Security Operations Centre (SOC); a one-off reduction in cost for
the O365 backup solution; and delays in delivery of WAN upgrade, planned bandwidth increases will incur increased
WAN charges in 2023/24.
(16) Income - This variance includes an over-recovery of £0.014m in income from IT hardware.
(8) Other minor variances
(230)
Note 5 People & ICT - Customer Services
Movement : There have been no significant movements since P10
2,540 (17) -1% Employee Costs - There is an underspend of £0.017m due to vacancy management.
298 (29) -10% Supplies and Services - There is an underspend of £0.029m due to lower than budgeted software licence costs.
6,207 71 1%
Third Party Payments - There is an overspend of £0.071m. This is due to an overspend of £0.081m in community care
grants. This overspend has occurred despite £0.147m unspent funding being accrued from 21/22 and a further
£0.088m top up being received from Scottish Government. This is offset by £0.010m excess funding received from
Scottish Government for bridging payments.
(3) Other minor variances
22
Note 6 Democratic Services - Policy, Performance & Elections
Movement : There have been no significant movements since P10
449 (61) -14% Employee Costs - There is an underspend of £0.041m due to vacancy management.
(21) Other minor variances
(82)                 
Note 2
144

Page 145

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Objective Summary
Annual
Budget Actual Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 20,675         19,857            (818)                (4%) 1         
Primary Education 45,541         45,378            (163)                (0%) 2         
Secondary Education 51,079         51,078            (1)                    (0%) 3         
Additional Support Needs 13,686         13,447            (239)                (2%) 4         
Education - Other 8,583           5,867              (2,716)             (32%) 5         
Pupil Equity Fund 4,972           4,972              -                      0%
Facilities Management 18,042         16,967            (1,075)             (6%) 6         
Connected Communities 14,168         13,841            (327)                (2%) 7         
Net Total 176,746       171,407          (5,339)             (3%)
Less Proposed Carry Forwards 3,603              3,603             
Net Total 176,746       175,010          (1,736)             (1%)
Subjective Summary
Annual
Budget Actual Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 95,035         93,139            (1,896)             (2%)
Employee Costs - Non Teachers 59,939         57,869            (2,070)             (3%)
Property Costs 2,107           2,196              89                   4%
Supplies and Services 16,496         15,253            (1,243)             (8%)
Transport and Plant Costs 180              212                 32                   18%
Administration Costs 828              754                 (74)                  (9%)
Other Agencies & Bodies 14,547         14,183            (364)                (3%)
Transfer Payments 580              541                 (39)                  0%
Other Expenditure -                   -                      -                      0%
Capital Financing 78                70                   (8)                    0%
Gross Expenditure 189,790       184,217          (5,573)             (3%)
Income (13,044)        (12,810)           234                 (2%)
Net Expenditure 176,746       171,407          (5,339)             (3%)
145

Page 146

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been a favourable movement of £0.200m compared to P10. This is mainly due to a larger than
expected underspend in payments to Funded Providers.
16,089 (102) -1% Employee costs: £0.102m underspend due to continuing recruitment gaps
545 (274) -50% Supplies & Services: an underspend of £0.227m in milk and healthy snack payments due to reduced uptake. There are
also small underspends across remaining budgets
4,311 (627) -15% Third Party Payments: an underspend of £0.627m mainly in payments to Funded Providers largely due to lower uptake of
places against anticipated projections.
(372) 203 -55% Income: under recovery of milk and healthy snack grant of £0.227m due to reduced uptake.
(18) Other minor movements across various budget lines
It is proposed to earmark £0.200m to address funding pressures in 23/24.
(818)
Note 2 Primary Education
Movement : There has been an unfavourable movement of £0.283m compared to P10.  This is mainly due to an
overspend in some schools against teaching staff (£0.168m) and a reduction in underspend (£0.123m) against non
teaching staff.
44,212 (261) -1%
Employee Costs : £0.430m underspend in non teaching staff costs of which £0.270m is due to a part year saving for
School Dining Supervisors who were appointed at the start of this academic year. The remainder is due to recruitment
gaps. An overspend of £0.168m in teacher staff costs across a number of schools. Further management action will
determine underlying reasons for these teacher overspends.
1,152 84 7% Supplies and Services :  £0.086m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
93 (44) -47% Third Party Payments: an underspend of £0.044m due to reduced recharges following a process review.
(84) 58 -69% Income: under recovery of school let income due to school lets not fully operational
(163)
Note 3 Secondary Education
Movement : There has been an unfavourable movement of £0.185m compared to P10. This is mainly due to an
overspend in some schools against teaching staff (£0.098m) and a reduction in underspend (£0.072m) against non
teaching staff.
44,118 (86) 0%
Employee Costs : a net £0.086m underspend in employee costs - £0.186m underspend in non teaching staff costs due to
recruitment gaps and a £0.098m overspend in teacher staff costs. Further management action will determine underlying
reasons for these teacher overspends.
6,703 64 1% Supplies and Services : £0.064m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
202 (35) -17% Third Party Payments: an underspend of £0.035m due to reduced recharges following a process review.
(83) 56 -67% Income: under recovery of school let income due to school lets not fully operational
(1)
Note 4 ASN
Movement: There has been a favourable movement of £0.294m compared to P10, due to a decrease in placement costs
of £0.170m as there has been a reduction in young persons accessing these services; further employee costs
underspends of £0.057m; and £0.059m underspend in third party payments.
12,261 (432) -4%
Employee costs: £0.164m underspend in teaching costs and a £0.268m underspend in non teaching staff costs across all
ASN school and bases provision from recruitment gaps.
There is an ongoing Supporting Needs review and this is due to be completed later this calendar year.
993 (233) -23% There is an underspend of £0.233m on external day placements as a result of the assessment process currently in place.
This enables the children to remain in mainstream establishments or in-authority ASN establishments.
499 523 105%
There is an overspend of £0.523m on external specialist residential placements.  Currently there are 9 children in
accommodation.  Joint working is ongoing with HSCP to continually assess the care setting for these children in delivering
positive outcomes.
119 (58) -49%
There is an underspend in payments to other bodies due to lower home and hospital charges from other local authorities
of £0.021m; an underspend in payments to private nurseries for ASN assistance £0.018m; and £0.020m underspend in
ASN General payments to other bodies.
(527) (56) 11% Other Local Authorities income - Other Local Authorities that choose to place children in NAC establishments. There is an
over recovery of £0.056m due to an increase in demand.
17 Other minor movements across various budget lines
(239)
146

Page 147

Appendix 2a
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 5 Education Other
Movement :There has been a favourable movement of £1.629m since P10. This is mainly due to underspends in
employee costs as a result of the teachers industrial action and over achieved teacher turnover but is partly offset by an
increased spend in teachers HQ cover costs.
6,799 (2,068) -30%
Employee costs: mainly due to an over recovery of teacher payroll turnover partially offset against an overspend against
Teachers HQ Cover costs giving a net over recovery of £0.789m.
There was £1.279m underspend in relation to the industrial action by teachers during Dec 2022/Feb 2023.
356 (48) -13% Property Costs:  underspends across various budget lines
169 (12) -7% Admin Costs:  small underspends across all budget lines
889 (211) -24% Supplies & Services:  small overspends across various budget lines of £0.018m offset by underspend of £0.215m in
COSD due to procurement tendering process to obtain best value for money.
1,415 (16) -1% Third Party Payments - small overspends across various subscriptions/licences amounting to £0.039m and underspend
of £0.054m
580 (39) -7% Transfer: underspend against EMA payments made
(1,717) (355) 21% Income - PPP insurance rebate £0.075m, PPP deductions of £0.302m in excess of budget due to rigorous contract
compliance arrangements and £0.017m salaries rec'd from capital
33 Other minor movements across various budget lines
It is requested to earmark a further £0.064m of COSD funds due to delays in procurement process for purchase of
clothing stock for uniform exchanges in schools
It is requested to earmark £0.259m of additional funding to be used to continue to meet the additional Teaching costs of
Ukrainian families.
It is requested to earmark £0.600m towards the first year costs of a Classroom Assistant workforce review as part of the
Supporting Needs national review process.
(2,716)
Note 6 Facilities Management
Movement: There has been a favourable movement of £0.125m since period 10 which is primarily due to an over-
recovery of income.
15,031 (585) -4%
Employee Costs: Underspend of £0.050m is due to reduced commercial catering activity.  There is an underspend of
£0.205m due to the reduced uptake of school meals.  In addition, there is an underspend of £0.309m due to recruitment
challenges and reduced overtime and casual costs.
1,079 126 12% Property Costs:  Overspend is primarily in relation to purchasing cleaning materials in response to Covid-19.
4,774 (873) -18%
Supplies and services: There is a saving of £0.062m in food due to reduced commercial catering.  There are further food
savings of £0.269m due to reduced school meal uptake and £0.064m within social services.  In addition, there is an
underspend within Early Years of £0.444m which has arisen due to a lower attendance rate than originally anticipated. 
(2,982) 231 -8%
Income: There is an under-recovery in commercial catering income of £0.472m due to a reduction in commercial events
and cost/ income challenges within commercial venues.  This is offset against an over-recovery of school meal income of
£0.068m and cleaning and janitorial income of £0.140m.
Facilities Management continue to promote the school meal service to maximise uptake.
26 Other minor movements
(1,075)
Note 7 Connected Communities
Movement: There has been a favourable movement of £0.327m since P10. This is a result of reduced spend across
many budgets held within supplies and services £0.218m and Third Party Payments of £0.123m.
7,957 (387) -5% Employee Costs: underspends across all sectors due to vacancy management.
1,473 (19) -1% Supplies and Services: small underspends across all budget lines.
5,980 (124) -2%
Third Party Payments: There are a number of underspends across various budget lines amounting to £0.124m.
The NALL deficit is not included but it is expected that any deficit will be offset by a draw from earmarked funds of
£0.318m set aside for this purpose.
(1,805) 182 -10% Income: £0.200m under recovery across various sectors as income has not returned to pre covid levels, partly offset by
over recovery in Harbour Arts Centre of £0.018m.
21 Other minor movements across various budget lines.
It is requested to earmark funds of £0.038m in relation to funding for youth modern apprentices
It is requested to earmark funds of £0.258m to meet essential boiler repair costs in swimming pools
(327)
147

Page 148

Appendix 3
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support (26)              -                    26                     (100%)
Housing and Public Protection
Building Services (2,547)         (2,547)           -                        0% 1         
Property Governance 43               43                 -                        0%
Planning Services 376             176               (200)                  0% 2         
Protective Services 1,784          1,111            (673)                  100% 3         
Other Housing 2,936          1,855            (1,081)               (37%) 4         
Total for Housing and Public Protection 2,592          638               (1,954)               (75%)
Neighbourhood Services
Roads 6,727          7,109            382                   6% 5         
Streetscene 5,583          5,997            414                   7% 6         
Waste Resources 9,748          9,941            193                   2% 7         
Total for Neighbourhood Services 22,058        23,047          989                   4%
Economic Development, Growth & Investment
Economic Development 6,682          6,540            (142)                  0% 8         
Growth & Investment 283             283               -                        0%
Total for Economic Development, Growth &
Investment 6,965          6,823            (142)                  (2%)
Sustainability, Transport and Corporate Property
Property Management & Investment 2,127          2,174            47                     0% 9         
Housing Assets & Investment (22)              -                    22                     0%
Property Maintenance (120)            40                 160                   0% 10       
Property Running Costs 5,073          5,347            274                   0% 11       
Energy and Sustainability 5,657          6,297            640                   11% 12       
Internal Transport 10,181        11,018          837                   8% 13       
Total for Sustainability, Transport and
Corporate Property 22,896        24,876          1,980                9%
Net Total 54,485        55,384          899                   2%
Transfer to Earmarked Reserves 931               931                  
Net Total 54,485        56,315          1,830                3%
148

Page 149

Appendix 3
Subjective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 48,456        50,635          2,179                4%
Property Costs 21,851        23,951          2,100                10%
Supplies and Services 9,963          9,443            (520)                  (5%)
Transport and Plant Costs 9,880          11,314          1,434                15%
Administration Costs 2,096          2,010            (86)                    (4%)
Other Agencies & Bodies 22,715        22,972          257                   1%
Transfer Payments -                  -                    -                       
Other Expenditure 182             37                 (145)                  (80%)
Capital Financing 60               58                 (2)                     
Gross Expenditure 115,203      120,420        5,217                5%
Income (60,718)       (65,036)         (4,318)               7%
Net Expenditure 54,485        55,384          899                   2%
149

Page 150

Appendix 3a
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since P10 however the service continued to manage significant financial
challenges.
9,164 184 2%
Employee costs: There was an overspend of £0.184m in employees costs due to the increased agreed pay award and
additional overtime payments to assist with labour shortages and changes to work composition.  These increased costs
were partially offset by a number of vacancies experienced throughout the year.
5,624 (1,151) (20%) Supplies & Services: An underspend of £1.151m in supplies and services. This is due to an underspend in materials as
a result of a change in the composition of the works programme.
547 60 11% Transport costs: The overspend of £0.060m in transport costs is due to increasing costs of skip hire.
2,152 1,017 47%
Third Party Payments: An overspend in third party payments of £1.017m. New workstreams for 22/23 have required an
above average subcontractor element. There has also been an increase in works that are wholly subcontracted due to
either labour shortages or specialist activities.
(20,153) (128) 1% Income: Movement across income lines has resulted in an over-recovery of £0.128m.
18 Other minor movements
0
Note 2 Planning Services
Movement: There has been a favourable movement of £0.140m since P10 mainly due to increased planning fee
income of £0.129m.
(608) (129) 21% Income :  Over recovery of £0.129m due to additional planning fee application Income.
104 (62) (60%) Supplies & Services: An underspend of £0.062m due to plans for the LDP reprofiling costs into 23-24.
(9) Other minor movements
(200)
Note 3 Protective Services
Movement: There has been a favourable movement of £0.310m since P10 mostly due to increased building warrant
income of £0.149m and additional employee underspends within CCTV of £0.058m.
2,650 (173) (7%) Employee Costs: An underspend of £0.173m in staffing costs due to vacancies during the year now mostly filled with
the exception of two posts.
(1,231) (482) 39% Income: Over recovery of £0.418m in building warrants and £0.053m additional recharged to HRA.
(18) Other minor movements
It is requested to earmark £0.040m of the vacancy underspend which was funding for the Trading Standards Authorised
Officer due to delays in recruiting.
(673)
150

Page 151

Appendix 3a
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 4 Other Housing
Movement: There has been a favourable movement of £0.435m since period 10 predominantly as a result of reductions
in property costs £0.187m; bad debt provision required and arrears write offs £0.157m; and futher underspends in
RRTP of £0.107m.  These are partially offset by an increase in employee costs of £0.079m.
4,110 (646) (16%)
Employee Costs: Underspend is due to a number of vacancies within the homeless service, this is of a temporary
nature and it is anticipated that all vacancies will be filled next financial year.  In addition to this a number of posts
transferred over to the Housing Options Hub to assist with the Ukraine Humanitarian crisis and funding for these posts
came from Scottish Government for that purpose.
3,015 (113) (4%)
Property Costs: £0.192m underspend in furniture and fittings purchases and property repairs as a result of delaying
replacements until an assessment of all Temporary Accommodation properties was carried out and due to staff being
redeployed to assist the Ukrainian resettlement programme; and £0.031m underspend in window and contract cleaning. 
This has partially been offset a £0.055m overspend in furnished tenancies; £0.022m additional costs in property rents;
£0.020m utility costs overspend due to rising prices; and £0.012m overspend in Council Tax payments. This is for
backdated Council Tax from the previous two years, which is due for temporary furnished properties while they were
unoccupied for a short period of time between tenants.
A significant proportion of furnished tenacies are in very poor condition, work had been postponed as a result of COVID
and staff shortages. The team are in the process of drawing up a schedule of works to be undertaken throughout
2023/24 to bring the accommodation back up to an appropriate standard.
1,589 (118) (7%) Third Party Payments: mainly due to £0.107m underspend on Rapid Rehousing Transition Plan costs, due to delays in
the start of the programme.
104 (134) (129%) Other Expenditure: The bad debt calculation has been reviewed and adjusted to reflect the current debt collection
profile resulting in a £0.096m underspend.  Arrears write offs are £0.038m lower than budgeted.
(6,308) (26) 0% Income: £0.051m over recovery in House and Hostel rents partially offset by under recovery of £0.023m in income from
other departments.
(44) Other minor movements
It is requested to earmark £0.290m of this underspend, £0.117m for furniture and fittings purchases, and £0.173m for
the 5 year Rapid Rehousing Transition Plan.  This is in addition to the £0.121m RRTP funding that has previously been
requested to be earmarked and is linked to the ongoing 5 year delivery programme.  As previously highlighted, funding
for the 5 year RRTP ends on 31 March 2024, there were delays to to implementation in the first two years as a result of
the pandemic, funding is therefore required for the 5 year plan to be implemented beyond the 31 March 2024.
(1,081)
Note 5 Roads
Movement: There has been a favourable movement of £0.031m since period 10. £0.022m of this favourable movement
relates to Roads Lighting and Traffic Signal energy costs.
2,467 229 9%
Supplies and Services: Overspend of £0.085m on street lighting and traffic signal energy costs, which is due to
inflation. Overspend of £0.103m relates to coated roadstone costs, which have been adversely affected by inflation.
Further overspend of £0.021m on Artificial Intelligence software costs and small overspends across the service.
2,588 (203) (8%)
Third Party Payments: £0.125m budget allocated for the introduction of the Car Parking Charges and Decriminalised
Parking Enforcement was not used. Underspends of £0.044m in both Coastal Assets and Flood Risk Management due
to contractor delays.
(3,143) 335 (11%) Income: Under recovery of income relates mainly to the £0.346m saving for Car Parking Charges and Decriminalised
Parking Enforcement, which was not achieved.
21 Other minor movements.
382
Note 6 Streetscene
Movement: There has been a favourable movement of £0.082m since period 10. Employee costs have decreased by
£0.030m and there has been a £0.031m increase in income, mainly from work for other Council departments.
7,316 355 5%
Employee Costs: There is an overspend of £0.355m in employee costs, primarily due to overtime costs, which is
partially offset with increased income from other Council departments. The overspend on overtime is partly due to non
scheduled operational activities such as A78 litter clearance (£0.056m), various events (£0.050m), and safety works for
memorials (£0.041m). Turnover of £0.112m wasn't realised.
133 176 132%
Transport Costs: There is an overspend of £0.176m in transport costs, which can be attributed partly to additional
vehicles required for the Covid response, vehicles required for seasonal workers, and to support the operational needs
within bereavements. In addition to this, there is a £0.062m overspend on skip hire costs.
0
352 49 14% Supplies and Services: Overspend on materials is partly offset with underspends against tools and employee uniforms.
(2,698) (187) 7% Income: There is an over recovery of income of £0.086m relating to internments and £0.256m relating to income from
other departments, offset with a £0.145m under recovery of fees and charges.
21 Other minor movements
Included within the Streetscene outturn there is a £0.023m underspend in Largs Car Park that will be transferred to
earmarked funds.
414
151

Page 152

Appendix 3a
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 7 Waste Services
Movement : There has been no significant movement since P10.
5,155 915 18%
Employee Costs:  Additional temporary labour remains in place within Waste Operations as the service recovers from
the pandemic. Work to review beats taking account of post pandemic waste composition analysis and to balance the
burden of new builds is ongoing with Trade Union colleagues resulting in support arrangements being required. In
addition there is a high volume of annual leave not taken due to COVID, requiring holiday cover.
489 180 37% Supplies & Services: Overspends on Trade effluent £0.147m and Refuse containers £0.131m, offset by underspends in
Materials £0.074m and Leachate £0.043m.
191 (41) (21%) Admin Costs:  Underspend of £0.041m due to reduced spend on external printing and advertising.
6,426 (737) (11%)
Third Party Payments:  Underspend in Payment to contractors of £0.718m largely a result of improved quality of our
recyclate streams following sustained ‘right stuff, right bin’ campaigns alongside more competitive recyclate prices
within our disposal contracts.
202 161 80% Transport Costs: Overspend of £0.183m due to the new way of working requiring 2 additional hire vehicles plus a long
term hire. This is being reviewed in line with the post pandemic review of beats.
(3,015) (264) 9%
Income: Over-recovery of income due to the recyclates market for glass, cans, plastics and paper being favourable to
provide income rather than a cost to the council £0.123m, along with increased income from the disposal of the content
of skips over the year of £0.136m.
(21) Other minor movements
It is requested to earmark £0.177m to support the cover costs for the remaining Covid annual leave.
214
Note 8 Economic Development
Movement : There has been no significant movement since P10.
5,522 (93) (2%) Employee Costs:  Underspend of £0.093m due to vacancies across Economic Development.
5,936 (73) (1%) Third Party Payments: Underspend on consultancy within Economic Policy £0.026m.
24 Other minor movements.
It is requested to earmark £0.040m of the above employee cost underspend for Interim Senior Manager positions with
EDR in 2023/24.
(142)
Note 9 Property Management and Investment
Movement : There has been no significant movement since P10.
2,485 (6) (0%) Employee Costs: An underspend of £0.006m due to vacancy management.
256 16 6% Supplies & Services:  small overspends across various budget lines of £0.016m.
(1,236) 31 (3%) Income: There is an under-recovery in fees general service (revenue) of £0.0.31m due to a concentration on delivery of
capital projects at the current time.
6 Other minor movements
47
Note 10 Property Maintenance Costs
Movement : There has been no significant movement since P10.
3,420 158 5%
Property Costs: increased costs due to external consultancy work associated with supporting the Education Estate
Review of £0.199m, and an increase in statutory compliance of £0.122m due to increasing compliance requirements as
the specification of our property estate increases through investment, offset by £0.135m through active management of
planned maintenance budgets to offset the aforementioned overspend.
(3,362) (22) 1% Income: additional income from Largs Campus grant.
24 Other minor movements
160
Note 11 Property Running Costs
Movement : There has been an unfavourable movement of £0.233m since P10 due to unbudgeted HRA charges for
community hubs within SHUs.
6,529 265 4%
Property Costs: increase in costs primarily due to unbudgeted HRA charges for community hubs within SHUs - service
charges of £0.112m and internal rental charges of £0.115m. There are also additional costs against the repairs-other
landlords budget of £0.038m due to the transfer of the commercial estate budget to Business Support & Development,
but remaining/residual commitments with Estates/ PMI.
9 Other minor movements
274
152

Page 153

Appendix 3a
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 12 Energy and Sustainability
Movement : There has been a favourable movement of £0.426m since P10.  This is due to reduced expected Gas and
Electricity costs.
532 (31) (6%) Employee Costs: An underspend of £0.031m due to vacancy management.
5,494 787 14%
Property Costs: Due to the current energy crisis and after drawing down £0.658m from contingencies there is an
overspend in property costs of £0.787m due to increased utility cost charges.  Most of this is overspend is Gas of
£0.854m, offset by small underspends in Biomass £0.035m and Electricity £0.035m.
The reported overspends are after the inclusion of budgeted inflation contingencies. The remaining overspend will be
offset against the additional inflationary provisions agreed by Council which have been reported within the Other
Corporate Items appendix.                                                                                                                                                        
288 (108) (38%) Third Party Payments: Underspend of £0.108m, the majority being £0.075m in relation to the LHEES delays in
appointing a consultant.
(9) Other minor movements
It is requested to earmark £0.075m in relation to the Local Heat Energy Efficiency Scheme due to delays in appointing a
consultant.
639
Note 13 Internal Transport
Movement - There has been a favourable movement of £0.035m since P10 due to a £0.039m decrease in fuel costs as
a result of lower fuel prices; £0.037m lower than expected repairs and maintenance costs; £0.032m additional over
recovery of income; and a £0.033m movement in other minor movements across various lines.  These are partially
offset by an increase in transport provision costs of £0.061m; and £0.058m of additional external hire costs.
1,802 8 0% Employee Costs:  There is an overspend of £0.008m due to reduced staff turnover.
4,226 578 14% Transport Provision Costs: Projected overspend of £0.578m is largely due to direct fuel cost increases and indirect fuel
and labour cost increases through our school transport contracts.
1,800 208 12% Fuel Costs: The overspend of £0.208m is due to the increase in fuel prices and the legislative changes restricting the
use of rebated gas oil (or 'red diesel' as it is commonly referred to).
567 124 External Hires: Overspend of £0.124m due to additional hire vehicles as a result of increased lead time for replacement
vehicles.
1,114 43 4% Repairs & Maintenance: Overspend of £0.043m in repairs and maintenance due to price increases and maximising the
life of assets due to the increased lead time for replacement vehicles and the shortage of available rental alternatives.
(251) (92) 37% Income: Overrecovery of £0.092m in bus transport income and hire of pool vehicles.
(33) Other minor movements
The reported overspends are after the inclusion of budgeted inflation contingencies. The remaining fuel price related
overspend will be offset against the additional inflationary provisions agreed by Council which have been reported within
the Other Corporate Items appendix.
836
153

Page 154

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,212 2,187 (25)               -1%
SPT Concessionary Fares 286 286 -                   0%
Ayrshire Joint Valuation Board 975 932 (43)               -4%
3,473 3,405 (68)               -2% 1            
Other Corporate Costs
Pension Costs 2,545 2,545 -                   0%
Central Telephones 190 190 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
9,281 6,362 (2,919)          (31%) 2            
Insurance Account 100 100 -                   0%
Housing Benefit 2,852 2,805 (47)               -2%
18,441 15,407 (3,034)          (16%)
Less Proposed Carry Forwards 2,092 2,092
Net Total 18,441 17,499 (942) (5%)
154

Page 155

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
There has been no material movement from Period 10
3,473 (68)                 -2% Annual requisitions confirmed at less than current budget.
(68)                
Note 2 Other Corporate Items
There has been a favourable movement of £0.165m since Period 10 is primarily related to the in year settlement of
outstanding HSCP debt, £0.834m, partly offset by a range of centrally held funds which have not been fully utilised in
year, (£0.661m).
9,281 (2,919)           
The projected underspend is primarily related to the drawdown of £1.666m earmarked funds in relation to additional
contractual and non contractual energy and fuel costs reported across the services, linked to significant unbudgeted
inflationary pressures and the release of £0.711m of bad debt provision linked to the settlement of the outstanding
HSCP debt. In addition, centrally held funds of £1.220m are not expected to be fully utilised in year, including additional
Scottish Government funding in relation to Core Curriculum Charges, changes to DHP distributions and the
administration of grants, £0.744m, and funding for pension autoenrolment and severances, £0.444m. In addition, an
overrecovery of corporate income has been reported in relation to the shared AVC scheme and the purchase of
additional annual leave, £0.116m.
These have been partly offset by the early settlement of outstanding HSCP debt, (£0.834m).
It is proposed to earmark funds of £1.967m as follows:
Provision for contractual electricity and gas price increases for 2023/24 to reflect current market inflationary levels,
£0.870m;
Contribution to Loans Fund Reserve to address ongoing signficant cost pressures in the Capital Programme, £0.512m;
Provision for the review of Democratic Services’ structures linked to workload pressures, £0.250m;
Business continuity resilience infrastructure, £0.100m;
Scottish Government Funding not fully utilised in year, £0.156m;
Previously approved budget allocation to support CCTV Review, £0.050m; and
Essential repairs to Irvine Harbour property, £0.029m.
(2,919)           
155

Page 156

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 20,077 20,077 - -
Contribution to Loans Fund Reserve 7,125 7,125 - -
Scottish Government Funding (348,966) (348,950) 16 (0%)
Council Tax (61,595) (61,989) (394) 1% 1
Contribution to Capital Fund 161 161
Use of / Contribution to Earmarked Funds (13,583) (13,583) - -
Net Total (396,781) (397,159) (378) 0%
Carried Forward Funds to 2023-24 £000 £000
Previously Approved Grants / External Funding
Early Learning and Childcare Expansion 1,622 Ukrainian Resettlement 259
ICT LAN and Telephony 166 Government funding not fully utilised 156
Cost of School Day 150 Local Heat and Energy Efficiency Scheme 75
Facilities Management - Lochshore 139 Trading Standards & Econ Dev staffing 80
Chambers webcasting 125 Youth Modern Apprenticeships 38
Rapid Rehousing Transition Plan 121 608        
Sustainability agenda 80
Easter Study Support 75 Other Commitments
Facilities Management - Moorpark PS 60 Energy Cost Inflation Provision 870        
Educational Psychologist Staffing 58 Classroom Assistants workforce review 600        
Local Development Plan 50 Contribution to Loans Fund Reserve 512        
Marress House Resources 40 Scottish Welfare Fund Demand Pressures 327        
Minor Adaptations 40 Auchenharvie Pool plant 258        
Community Wealth Building 35 Democratic Services Structure Review 250        
Democratic Service pressures 34 Early Learning and Childcare Expansion 200        
23/24 Non recurring savings contributions 33 Waste Services Annual Leave 177        
2,828 Rapid Rehousing Transition Plan 173        
Temporary Accommodation Furniture 117        
Cost of School Day 64          
CCTV installation and maintenance 50          
Essential repairs to Irvine Harbour property 29          
Largs Car Park Fund 23          
3,650     
Investments
Resilience Infrastructure 100
100
7,186     
Note 1 Council Tax
Movement: There has been a favourable movement of £0.428m since period 8. This is primarily related to an adjustment
to the historic contributions to the Affordable Housing Reserve.
156

Page 157

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,300 5,290 (10) (0%)
Property Costs
Responsive Repairs 5,677 6,632 955 17%
Void Repairs 3,147 3,476 329 10%
Planned and Cyclical Maintenance 4,856 4,489 (367) (8%)
Aids and Adaptions 1,617 1,590 (27) (2%)
Other property costs 3,553 4,346 793 22%
Total for Property Costs 18,850 20,533 1,683 1
Supplies & Services 451 374 (77) (17%) 1
Transport Costs 34 16 (18) (53%)
Administration Costs 1,881 1,540 (341) (18%) 3
Third Party Payments 2,550 2,760 210 8% 4
Transfer Payments 155 136 (19) (12%)
Other Expenditure 368 836 468 127% 5
Capital Financing Costs 25,264 23,527 (1,737) (7%) 6
Gross Expenditure 54,853 55,012 159 0%
Income
Council House Rents (53,310) (52,663) 647 (1%)
Other Rents (326) (344) (18) 6%
Recharges (1,071) (812) 259 (24%)
Other Income (146) (219) (73) 50%
Transfer from HRA Reserves - (974) (974) 0%
Total Income (54,853) (55,012) (159) 0% 7
Net Expenditure - - -
157

Page 158

Appendix 6a
HRA
BUDGETARY CONTROL 2022/23
REPORT FOR THE YEAR TO 31 MARCH 2023
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
18,850 1,683 9%
1,683
Note 2
451 (77) -17%
(77)
Note 3
1,881 (341) -18%
(341)
Note 4
2,550 210 8%
210
Note 5
368 468 127%
468
Note 6
25,264 (1,737) -7%
(1,737)
Note 7
(54,853) (159) 0%
(159)
Third Party Payments
Movement - there has been an favourable movement of £0.258m primarily due to an underspend on central
support costs.
An overspend of £0.468m in Other Expenditure mainly due to an increase in bad debt provision of £0.497m
Section
Property Costs
An overspend in property costs of £1.683m. This is due to an overspend of £0.955m in Responsive Repairs,
£0.329m in Void Repairs and £0.766m in other property costs of which £0.138m relates to increased Council Tax
payments and £1.010m in sheltered housing utility costs. This is partially offset by an underspend of £0.366m in
Planned and Cyclical Maintenance and £0.028m in Aids & Adaptations.
Movement - an adverse movement of £0.122m since Period 10. This is due to an increase of £0.129m in
Responsive Repairs, £0.233m in Void Repairs and £0.215m in Other Property costs partially offset by a reduction
of £0.427m in Planned and Cyclical Maintenance and £0.028m in Aids & Adaptations.
An underspend in administration costs of £0.341m. This is primarily due to an underspend of £0.130m in legal fees
and £0.177m in central support costs.
Administration Costs
Supplies and Services
An underspend in supplies and services of £0.077m. This is primarily due to an underspend of £0.072m in
computer equipment.
Movement - an adverse movement of £0.043m since Period 10.
Capital Financing Costs
Movement - an adverse movement of £0.331m since P10 due to revised loan charges linked to revised capital
expenditure requirements.
Other Expenditure
There is an underspend in capital financing costs of £1.737m due to reduced loan charges. This is due to the
reduced levels of expenditure currently being experienced in the HRA Capital budget.
Income
Movement - an adverse income movement of £0.446m since Period 10. This is due to a reduction of £0.046m in
Council House rents, £0.035m in Rents, £0.397m in Recharges partially offset by an increase of £0.032m in other
income. This movement has been offset by a drawdown from Earmarked Reserves of (£0.974m).
An under recovery in income of £0.815m. This is due to an under recovery of £0.647m in Council House Rents and
£0.259m In Recharges. This is partially offset by an over recovery of £0.018m in Rents and £0.073m in Other
Income. This has been offset by a drawdown from Earmarked Reserves of (£0.974m).
Movement - there has been an adverse movement of £0.061m since Period 10. This is primarily due to an increase
of £0.086m in Housing Asset and Investment recharges partially offset bya reduction of £0.019m in the ASB &
Tenancy support charges.
Movement - there has been an adverse movement of £0.504m since P10. This is primarily due to an increase in
bad debt provision of £0.497m
An overspend in third party payments of £0.210m. This is primarily due to an overspend of £0.271m in the Housing
Asset and Investment recharges partially offset by an underspend of £0.057m in the ASB & Tenancy support
charges.
158

Page 159

Appendix 6a
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Balance at
31/03/23
£m £m £m £m £m £m
5.280 - - - (0.571) 4.709
1.500 - - - - 1.500
5.000 - - - - 5.000
1.558 (0.974) - - - 0.584
0.123 - - - - 0.123
0.270 - - - - 0.270
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.781 - - - - 0.781
15.616 (0.974) - - (0.571) 14.071
Major Refurbishment Works
Council House Building Fund
Welfare Reform
Unearmarked
Tenant led budget
HRA reserves and balances
Sustainability Fund
Voids - non programmed works
Software Licences
Electrical Testing
Infrastructure Improvements
159

Page 160

Appendix 7
1) Budget Virements
Place
Roads Third Party Payments T 0.145
Roads Employee Costs T 0.079
Roads Supplies and Services T 0.065
Roads Income T -0.289
Regeneration Grant Income T 0.088
Regeneration Third Party Payments T -0.039
Regeneration Employee Costs T -0.049
PMI Supplies and Services T -0.196
PMI Income T 0.196
0.000
Information and Culture - Third Party Payments T 0.020
Information and Culture - Property Costs T 0.085
Information and Culture - Supplies and Services T -0.071
Information and Culture - Transport Costs T -0.005
Information and Culture - Income T -0.029
0.000
Communities
Budget Management - 31 March 2023
Virement/Budget Adjustments
2022/23
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m
160

Page 161

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Capital Programme Performance to 31 March 2023 
Purpose:  To advise Cabinet of progress in delivering the Capital
Investment Programme for 2022/23. 
Recommendation:  That Cabinet agrees to (a) note the revisions to budgets
outlined in the report; and (b) note the General Services and
HRA expenditure to 31 March 2023. 
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2022/23 to 2030/31 was
approved by Council on 2 March 2022. The Housing Revenue Account (HRA) Capital
Investment Programme 2022/23 sits within the updated HRA Business Plan and was
approved by Council on 16 February 2022. 
1.2  This is the final monitoring report for the year which identifies the current programme
for 2022/23, taking account of adjustments made to the initial budgets and advises of
the actual expenditure to 31 March 2023. 
1.3   The final outturn report for the General Fund reports a net breakeven position against
a revised budget of £36.194m. The final outturn position for the HRA is an
underspend of (£6.399m) against a revised budget of £36.910m. 
1.4  Within the General Fund, adjustments to funding have resulted in net reductions to the
overall capital programme of (£2.385m). Further reviews of individual project plans
have identified a number of adjustments to the current profiles. As a result, (£5.625m)
has been reprofiled for delivery in 2023/24. This has been partly offset by the
acceleration of £1.391m to 2022/23 from future years. 
1.5 Within the HRA, additional government grants of £0.496m have been received in
relation to the Ukrainian Resettlement programme while a review of delivery
timescales has identified a requirement to re-profile (£9.185m) of works for delivery in
2023/24 and beyond. This is offset by the acceleration of £2.158m to 2022/23 from
future years. 
Agenda Item 9
161

Page 162

1.6 Major cost risks have been identified across the Capital Investment Programme as a
result of the uncertainty arising from the ongoing inflationary pressures and supply
chain issues which are impacting on tender returns and the cost of materials, as
reported across a number of General Fund and HRA projects. In addition, upward
movements on the interest rates applicable to public sector borrowing present further
risks to the deliverability of both the General Fund and HRA capital programmes over
the medium term. While some mitigation has been built into the programme to offset
cost pressures, all projects will continue to be monitored to identify and assess any
cost pressures which cannot be met from within the existing flexibility. 
2. Background 
General Fund 
2.1 The following table outlines the movements in the 2022/23 General Services budget: 
2.2 (a) Changes to Funding 
The capital programme has been updated to reflect the following changes to funding: 
2022/23
£m
Budget as at 31 January 2023 42.813     
a) Changes to Funding 0.209        
b) Other Revisions to the Programme (2.594)      
Revised Budget 40.428     
c) Alterations to phasing of projects:-
2022/23 to 2023/24 (5.625)           
2023/24 to 2022/23 1.391        
Budget as at 31 March 2023 36.194     
Funding Body Amount Project
Scottish Government £0.120m Scottish Office New Grant - Boyle St Hostel
Sustrans £0.269m Saltcoats Old Cal Railway Ph1
£0.034m Access Paths
£0.032m Saltcoats Old Cal Railway Ph2
£0.029m AGD Great Harbour
Energy Saving Trust £0.002m Workplace Chargers
SPT (£0.222m) Bus Corridor etc. Grants Downturned
Scottish Forestry (£0.055m) STTS U88 North Sannox Grant Downturned
Total £0.209m
162

Page 163

2.3 (b) Other Revisions to the Programme 
Further additions to the programme of £1.204m have been identified in relation to
drawdowns from reserves and other revenue funding to support a range of projects.
This has been offset by the identification of a number of projects totalling (£3.798m)
which, although managed as part of the Capital Programme, have been transferred
for inclusion in the year end Revenue Monitoring report in line with accounting
requirements. 
2.4 (c) Alterations to the Phasing of Projects 
A review of individual project plans has identified a requirement to re-profile a further
(£5.625m) of works for delivery in 2023/24 and beyond. This includes the reversal of
the in-year corporate phasing adjustment which reflected the level of optimism bias
included in the expenditure forecasts:
Funding Source Amount Project
Transfers to Revenue (£1.605m) Millport Town Hall
(£0.886m) Various CFCR transferred to Revenue
(£0.587m) Place Based Investment Programme
(£0.529m) Improvement Grants
(£0.085m) Stevenston Beach Hub
(£0.069m) Town Centre Regeneration
(£0.037m) VDLF
CFCR £0.703m Glenartney Arran Staff Accommodation
£0.069m Marress House
£0.024m AGD - Irvine Harbourside (The Great Harbour)
£0.012m Brodick Library
£0.012m AGD Marine Tourism - Arran
£0.012m AGD Marine Tourism - Cumbrae
Capital Receipt £0.049m Insurance Recoveries
Use of Reserves £0.085m Park Improvements
£0.076m Shewalton PV
£0.069m Street Furniture
£0.052m Shiskine Early Years
£0.026m Gallowgate Toilets
£0.015m Ardrossan Hostel
Total (£2.594m)
163

Page 164

Service Amount Project
Communities (£0.139m) Lockhart Campus
(£0.055m) Kilwinning Learning Enviroment
(£0.151m) Other Minor Adjustments
(£0.345m)
Chief Executives (£0.050m) ICT Investment Fund
(£0.007m) Telephony
(£0.057m)
HSCP (£0.363m) Residential & Respite Unit
(£0.168m) Carefirst Replacement
(£0.001m) Other Minor Adjustments
(£0.532m)
Place (£0.768m) Upper Garnock FPS
(£0.724m) Millport FPS
(£0.599m) Fleet Decarbonisation
(£0.495m) Place Based Investment
(£0.475m) VDLF Development Work
(£0.435m) Vehicles
(£0.431m) Industrial Portfolio
(£0.398m) Solar PV Nethermains
(£0.369m) Lochshore Garnock HUB
(£0.350m) CCTV Review
(£0.323m) B714 Upgrade
(£0.246m) Gallowgate Toilets
(£0.238m) BUILD
(£0.214m) Saltcoats Old Railway
(£0.200m) AGD - I3 DPMC Phase 1
(£0.157m) Emergency Control Centre
(£0.154m) AGD - Hunterston -  Low Carbon Energy
(£0.151m) AGD - Great Harbour
(£0.143m) AGD - IMSE
(£0.140m) Island Infrastructure Fund
(£0.126m) Renew Playparks
(£0.112m) Lochshore Kilbirnie
(£1.403m) Other Minor Adjustments
(£8.651m)
Other (£0.104m) Flexibility Fund
(£0.104m)
Corporate £4.064m Uncertainty / Sensitivity Adjustment
£4.064m
Total (£5.625m)
164

Page 165

These adjustments have been partly offset by the acceleration of £1.391m of
expenditure to 2022/23 from future years. 
2.5 These adjustments have resulted in a revised 2022/23 budget at 31 March 2023 of
£36.194m. 
2.6 The following graph illustrates the movement in each programme on a service basis
compared to the revised programme: 
Service Amount Project
Chief Executives £0.045m ICT Investment Fund
£0.011m LAN/WiFi
£0.056m
Place £0.149m Cycling/Safer Walking Streets
£0.099m AGD - I3 Flexible Business Space
£0.052m Cemetery Extensions & Walls
£0.153m Other Minor Adjustments
£0.453m
Communities £0.636m Moorpark Primary
£0.209m Montgomerie Park Primary
£0.035m Schools ICT Investment
£0.002m Other Minor Adjustments
£0.882m
Total £1.391m
38.672 32.249 0.492 50.239 2.500 124.152
25.201 8.948 2.002 43.502 (10.019) 69.634
25.196 6.764 1.672 38.451 (8.321) 63.762
9.045 2.555 1.578 40.231 (4.782) 48.627
8.573 2.366 1.262 34.676 (4.064) 42.813
10.207 1.014 0.903 24.070 - 36.194
(30.099) (29.883) 0.770 (15.563) (6.564) (81.339)
Approved Programme
Movement
Programme @ P6
Programme @ P4
Programme @ P10
Programme @ P8
Programme @ P12
165

Page 166

2.7  The impact on budgeted funding, elements of which are related to the profile of
expenditure reported above, is a reduction of (£6.619m) from the revised budget,
including: 
2.8 Capital Expenditure to 31 March 2023 
The actual expenditure by service is summarised in the following table:   
2.9 Significant cost risks have been identified across the Capital Investment Programme.
Although these have not all been formally reflected in the financial performance
reports at this time, areas of cost risk have been identified as a result of cost volatility
arising from the ongoing inflationary pressures, outstanding contractor claims and
supply chain issues which are impacting on tender returns and the cost of materials
across a number of projects, as highlighted in appendix 1. Some mitigation has been
built into the Capital Investment Programme in the form of enhanced flexibility
budgets. However, cost pressures may exceed this provision, requiring additional
revenue investment to offset any additional borrowing requirements. These risks will
be quantified as individual projects are completed and tendering exercises are
finalised, with the impact on the costs of the programme being monitored and reported
to Cabinet as appropriate. 
Category Amount Comments
Borrowing £1.814m Rephased aligned to projected expenditure
CFCR (£0.428m) Additional CFCR Contributions
Capital Grants £4.768m Rephased and additional government grants
Other Grants £0.544m Rephased and revised contributions
Capital Receipts (£0.079m) Realigned capital receipts
Total £6.619m
Revised
Budget
2022/23
Budget
Revisions
Carry
Forwards
and
Adjustments
Revised
Budget
2022/23
Actual
Expenditure
/ Income to
31 March
2023
Variance
Over /
(Under)
£m £m £m £m £m £m
Expenditure
Communities 8.573 1.097 0.537 10.207 10.207 -
Chief Executive 2.366 (1.351) (0.001) 1.014 1.014 -
Health and Social Care Partnership 1.262 0.173 (0.532) 0.903 0.903 -
Place 34.676 (2.408) (8.198) 24.070 24.070 -
Other including Flexibility (4.064) 0.104 3.960 - - -
Total Expenditure 42.813 (2.385) (4.234) 36.194 36.194 -
Income
General Capital Grant (26.341) 0.530 - (25.811) (25.811) -
Specific Capital Grant (9.194) 2.263 1.975 (4.956) (4.956) -
Capital Funded from Current Revenue (0.081) (0.167) (0.261) (0.509) (0.509) -
Capital Receipts (0.212) (0.049) (0.030) (0.291) (0.291) -
Other Grants & Contributions (2.679) (0.089) 0.633 (2.135) (2.135) -
Prudential Borrowing (4.306) (0.103) 1.917 (2.492) (2.492) -
Total Income (42.813) 2.385 4.234 (36.194) (36.194) -
166

Page 167

2.10 Any funding in excess of the current level of financial flexibility, which is required to
deliver the current capital programme, will be a matter for Council to consider within
the context of overall affordability. This affordability assessment was included in the
Capital Budget approved at Council on 1 March 2023 and incorporated all known cost
pressures, funding and borrowing requirements based on current and projected
interest rates, the anticipated re-direction of revenue resources and use of financial
flexibilities to support delivery of the programme and a further flexible allowance to
help manage the ongoing cost risks associated with the programme.   
Housing Revenue Account 
2.11 The following table outlines the movements in the 2022/23 HRA Capital budget: 
2.12  (a) Changes to Funding 
The HRA capital programme has been updated to include additional Scottish
Government grant funding of £0.486m in relation to the Ukrainian Resettlement
programme supporting the redevelopment works at Glebe Place, Saltcoats. 
2.13 (b) Alterations to the Phasing of Projects 
A further review of the timescale for delivery of capital projects has identified a
requirement to re-profile (£9.185m) of works for delivery in 2023/24 and beyond,
including: 
2022/23
£m
Budget as at 31 January 2023 43.451       
a) Changes to Funding 0.486         
b) Alterations to phasing of projects:-
2022/23 to 2023/24 (9.185)             
2023/24 to 2022/23 2.158         
Budget as at 31 March 2023 36.910       
167

Page 168

This has been partly offset by the acceleration of £2.158m of project expenditure for
delivery during 2022/23, including: 
Category Amount Project
New Builds (£0.728m) Harbourside Irvine
(£0.626m) Afton Court
(£0.543m) Corsehillhead
(£0.299m) Largs Police Station
(£0.282m) Caley Court
(£0.241m) Flatt Road Phase 1
(£0.219m) Acquisiton on Open Market
(£0.107m) Other Minor Adjustments
(£3.045m)
Improvements (£1.048m) Insulated Rerendering
(£1.018m) Kitchen Programme Voids
(£0.855m) Bathroom Programme Voids
(£0.063m) Sheltered Housing Units
(£2.984m)
Category Amount Project
Refurbishments (£0.478m) Roofing & Rendering
(£0.295m) Demolition High Flats Irvine
(£0.230m) Friars Lawn
(£0.024m) Other minor adjustments
(£1.027m)
Other (£1.738m) Professional Management Charges
(£0.348m) Solar Panels
(£0.043m) Other minor adjustments
(£2.129m)
Total (£9.185m)
Category Amount Project
New Builds £0.120m James Reid ASN
£0.113m Other minor adjustments
£0.233m
Improvements £0.997m Bathroom Programme
£0.297m Kitchen Programme
£0.132m Central Heating
£0.031m Other minor adjustments
£1.457m
Refurbishments £0.035m Friars Lawn
Other £0.384m Estate Based Regeneration
£0.049m Other minor adjustments
£0.433m
Total £2.158m
168

Page 169

2.14 These adjustments have resulted in a revised 2022/23 budget at 31 March 2023 of
£36.910m. 
2.15 The impact on budgeted funding is a reduction of (£6.297m) in Prudential Borrowing
and (£1.626m) in Use of Reserves aligned to the revised projected expenditure. This
has been partly offset by an increase drawdown of Capital grants of £1.382m. 
2.16  Capital Expenditure to 31 March 2023 
The actual expenditure is summarised in the following table:   
2.17 A variance of (£6.399m) is reported within the HRA capital programme for 2022/23
arising from revisions to a number of projects. This is primarily related to the
overprovision against a number of improvement programmes, which will be reprofiled
to align to the revised Business Plan and net underspends on the final costs across a
number of new build programmes which are now complete. In addition, the reports
highlights additional unbudgeted expenditure in relation to Ukrainian Resettlement
work and discussions with the Scottish Government are ongoing in relation to
potential funding: 
Category Amount Comments
Borrowing £6.297m Rephased aligned to actual expenditure
Use of Reserves £1.626m Rephased aligned to actual expenditure
Capital Grants (£1.382m) New grants and re-aligned to actual expenditure
Total £6.541m
Revised
Budget
2022/23
Carry
Forwards
and
Adjustments
Revised
Budget
2022/23
Actual
Expenditure /
Income to 31
March 2023
Variance
Over /
(Under)
Service £m £m £m £m £m
Expenditure
Housing Revenue Account 43.451 (6.541) 36.910 30.511 (6.399)
Total Expenditure 43.451 (6.541) 36.910 30.511 (6.399)
Income
Sale of Assets - - - (0.005) (0.005)
CFCR (12.209) (12.209) (12.209) -
Capital Grants (1.767) (1.382) (3.149) (3.149) -
Use of Reserves (1.151) 0.580 (0.571) (0.571) -
Affordable Housing Contribution (1.596) 1.046 (0.550) (0.550) -
Prudential Borrowing (26.728) 6.297 (20.431) (14.027) 6.404
Total Income (43.451) 6.541 (36.910) (30.511) 6.399
169

Page 170

2.18 Increased costs arising from tender inflation and supply chain issues have been
identified in relation to some projects, including the Door Replacement Programme
and Sheltered Housing Unit Improvements. Further cost pressures resulting from
inflationary and supply chain issues continue to be monitored and a review of the
potential impact on the Business Plan and Capital Programme will be undertaken to
address any identified issues. Further information on the progress of all projects can
be found in Appendix 2. 
3. Proposals 
3.1 That Cabinet agrees to (a) note the revisions to budgets outlined in the report; (b) note
the General Services and HRA expenditure to 31 March 2023. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Expenditure will continue to be
closely monitored to ensure early action is taken regarding any projected
underspends or overspends. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Project Variance Comments
Glebe Place Refurb £0.052m Unbudgeted Expenditure
New Build St Michaels Wynd £0.097m Complete
New Build St Beya Millport (£0.002m) Complete
New Build Towerlands (£0.009m) Complete
New Build Dalrymple Place (£0.017m) Complete
New Build St Colms (£0.034m) Complete
New Build Springvale Saltcoats (£0.091m) Complete
New Build Brathwic Terrace (£0.125m) Complete
Central Heating (£0.642m) Aligned to revised Business Plan
Electrical Rewiring (£1.494m) Aligned to revised Business Plan
Roofing & Rendering (£1.834m) Aligned to revised Business Plan
Kitchen Programme (£2.300m) Aligned to revised Business Plan
Total (£6.399m)
170

Page 171

Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Capital Programme Performance to 31 March 2023 – Cabinet, 21 March 2023 
171

Page 172

TOTAL PROJECT
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2022/23
Brought / Carry
Forward to 2023/24
Total Revised
Budget 2022/23
Actual Expenditure to
31 March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend
£ £ £ £ £ £ £ £ £ £
EXPENDITURE
Communities
Nursery Education 15,918,237 15,799,375 15,918,237 0 2,316,976 (27,263) 2,289,713 2,289,713 0 0
Primary Schools 41,255,113 8,167,653 41,255,113 0 4,389,528 813,158 5,202,686 5,202,686 0 0
Secondary Schools 83,010,742 3,916,675 83,010,742 0 719,721 (101,085) 618,636 618,636 0 0
Special Education 25,343,637 25,205,042 25,343,637 0 803,662 (138,595) 665,067 665,067 0 0
Schools Other 1,648,363 1,536,800 1,648,363 0 1,395,712 34,980 1,430,692 1,430,692 0 0
Information & Culture 113,479 6,563 113,479 0 40,852 (40,852) 0 0 0 0
Completed Projects 43,419,379 43,415,700 43,419,379 0 3,679 (3,679) 0 0 0 0
SUB TOTAL 210,708,950 98,047,807 210,708,950 0 9,670,130 536,663 10,206,793 10,206,793 0 0
Chief Executive
Council IT Strategy 8,496,682 2,525,457 8,496,682 0 1,014,758 (1,030) 1,013,728 1,013,728 0 0
SUB TOTAL 8,496,682 2,525,457 8,496,682 0 1,014,758 (1,030) 1,013,728 1,013,728 0 0
Health & Social Care
Management & Support 2,753,095 1,493,221 2,753,095 0 919,529 (170,065) 749,464 749,464 0 0
Housing Non HRA 506 0 506 0 506 (506) 0 0 0 0
Adults 4,608,078 4,590,031 4,608,078 0 26,868 1,889 28,757 28,757 0 0
Young People 5,579,718 5,216,541 5,579,718 0 487,982 (363,177) 124,805 124,805 0 0
SUB TOTAL 12,941,398 11,299,792 12,941,398 0 1,434,885 (531,859) 903,026 903,026 0 0
Place
Roads 108,160,167 28,669,977 108,160,167 (2,154,880) 13,926,294 (2,154,880) 11,771,414 11,771,414 0 0
Streetscene 7,891,828 3,680,140 7,891,828 0 2,385,756 (125,146) 2,260,610 2,260,610 0 0
Transport 4,719,306 1,729,406 4,719,306 0 2,740,706 (1,126,900) 1,613,806 1,613,806 0 0
Waste Services 14,539,343 14,539,343 14,539,343 0 0 0 0 0 0 0
Renewable Energy 14,952,181 1,868,609 14,952,181 0 787,008 (516,864) 270,144 270,144 0 0
Office Accommodation 3,356,286 1,476,916 3,356,286 0 1,674,133 (197,217) 1,476,916 1,476,916 0 0
Other Property 5,986,638 467,239 5,986,638 0 962,243 (877,634) 84,609 84,609 0 0
Other Housing 470,000 88,975 470,000 0 470,000 (381,025) 88,975 88,975 0 0
Economic Development & Regeneration 165,624,490 28,313,889 165,624,490 0 9,306,699 (2,818,098) 6,488,601 6,488,601 0 0
Completed Projects 6,355,261 6,314,666 6,355,261 0 15,304 0 15,304 15,304 0 0
SUB TOTAL 332,055,501 87,149,160 332,055,501 (2,154,880) 32,268,143 (8,197,764) 24,070,379 24,070,380 0 0
Other
Other 7,704,146 0 7,600,000 (104,146) 104,146 (104,146) 0 0 0 0
SUB TOTAL 7,704,146 0 7,600,000 (104,146) 104,146 (104,146) 0 0 0 0
Uncertainty / Sensitivity Adjustment* (4,064,230) 4,064,230 0
Total Project Expenditure 571,906,677 199,022,217 571,802,531 (2,259,026) 40,427,832 (4,233,906) 36,193,927 36,193,927 0 0
Total Project Income (40,427,832) 4,233,906 (36,193,927) (36,193,927) (0) 0
Total Net Expenditure 0 0 0 (0) 0 0
* Sensitivity adjustment of 10% or 25% based on source and reliability of expenditure projections
On Target (+0.5% of budget) On Target (up to  5% delay of original timescales)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less) Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less) Significantly off target (+10% or more of original timescales)
The following classifications have been used to highlight financial performance against
budget
CURRENT YEAR 2022/23
North Ayrshire Council Capital Statement 2022/23
Year Ended 31st March 2023
Period 12
The following classifications have been used to highlight delivery performance
against original timescales set
172

Page 173

Revised Budget
22/23 Variance
£ £ £ £ £ £ £ £
CAPITAL BORROWING
Prudential Borrowing 94,515,334 9,882,875 1,655,477 106,053,686 (103,561,460) 2,492,226 2,492,226 0
SUB TOTAL 94,515,334 9,882,875 1,655,477 106,053,686 (103,561,460) 0 2,492,226 2,492,226 0
SCOTTISH GOVERNMENT FUNDING
Specific Capital Grants
Early Learning & Childcare 464,253 517,775 982,028 (89,170) 892,858 892,858 0
Cycling / Walking /Safer Streets 1,111,122 38,831 (300,566) 849,387 (135,172) 714,215 714,215 0
Vacant & Derelict Land Funding 3,710,375 123,927 848,022 4,682,324 (3,109,316) 1,573,008 1,573,008 0
UK Government Grant - AGD 2,040,120 2,040,120 (1,733,379) 306,741 306,741 0
Lochshore - Garnock Community Visitor Hub 0 50,000 50,000 0 50,000 50,000 0
Town Centre Regeneration 0 166,774 250,000 416,774 (274,288) 142,486 142,486 0
Stevenston Beach Hub 0 34,525 50,000 84,525 (84,525) 0 0 0
Annickbank - Vacant & Derelict Land Investment Programme 0 0 0 0
Millport Town Hall Regeneration 0 382,028 1,187,810 1,569,838 (1,569,838) 0 0 0
Millport Town Hall Phase 2 0 0 0 0 0
Ardrossan Promenade 0 0 0 0 0
Islands Pit Stops 0 0 0 0 0
Islands Cost Crisis Emergency Fund 0 0 0 0 0
Place Based Investment Programme 706,000 147,903 346,040 1,199,943 (1,065,579) 134,364 134,364 0
UK Shared Prosperity Fund 0 0 0 0
Island Infrastructure Fund 0 259,000 259,000 (140,373) 118,627 118,626 0
Bridges Infrastructure 567,000 (567,000) 0 0 0 0 0
B714 Improvements 857,907 197,160 1,055,067 (165,808) 889,259 889,259 0
Renewal of Play Parks 0 117,000 117,000 (117,000) 0 0 0
Nature Restoration Fund 0 0 0 0 0 0
2-4 Boyle Street Hostel 0 88,975 88,975 88,975 0
CO2 Monitors in Schools 0 122,000 122,000 (76,651) 45,349 45,349 0
Capital Grants
General Capital Grant 9,805,000 845,000 10,650,000 15,161,506 25,811,506 25,811,506 0
SUB TOTAL 22,039,777 1,780,923 3,035,306 26,856,006 3,911,382 0 30,767,388 30,767,388 0
CFCR 600,000 0 0 600,000 (91,325) 0 508,675 508,675 0
Grants & Contributions 1,925,682 866,594 1,539,395 4,331,671 (2,196,996) 0 2,134,675 2,134,675 0
Capital Receipts 352,500 0 0 352,500 (61,534) 0 290,966 290,966 0
SUB TOTAL 7,597,157 1,050,109 1,628,337 10,275,603 (7,341,287) 0 2,934,313 2,934,313 0
TOTAL CAPITAL PROGRAMME FUNDING 124,152,268 12,713,907 6,319,120 143,185,295 (106,991,365) 0 36,193,927 36,193,927 0
22/23 Budget at
Capital Refresh
Mar 2022
Capital Programme Funding 2022/23
Approved budget
at Period 1 used
as revised starting
point 2022/23
Actual Income to 31
March 2023Funding Description
Carry Forward
from 2021/22
Changes after
Capital Refresh Mar
2022
Total Changes in
Year
Changes at
Capital Refresh
Mar 2023
173

Page 174

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Actual Expenditure to
31 March 2023
Actual Over/ (Under)
Spend for 2022/23   
True Over/(Under)
Spend            
Brought / Carry
Forward to 2023/24 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £
Nursery Education
Early Years Programme
ST BRIDGETS EARLY YEARS 787,477 787,477 787,477 0 10,378 10,378 0 0 Complete Complete Complete On Target On Target
KILMORY EARLY YEARS 55,978 28,187 55,978 0 195 195 0 0 15-Aug-22 31-Aug-23 Pre Tender On Target On Target
ST PETERS EARLY YEARS 1,261,310 1,243,727 1,261,310 0 25,646 24,750 (896) (896) Complete Complete Complete On Target On Target
MAYFIELD PS EARLY YEARS 215,710 215,710 215,710 0 5,680 5,680 (0) (0) Complete Complete Complete On Target On Target
BEITH PS EARLY YEARS 339,764 339,763 339,764 0 4,983 4,983 (0) (0) Complete Complete Complete On Target On Target
SKELMORLIE PS EARLY YEARS 359,069 358,835 359,069 0 4,121 3,887 (234) (234) 30-Apr-23 30-Apr-23 Defects On Target On Target
WEST KILBRIDE EARLY EARLY YEARS 232,807 225,055 232,807 0 11,531 3,779 (7,752) (7,752) Complete Complete Complete On Target On Target
GATESIDE EARLY YEARS 407,764 407,764 407,764 0 2,899 2,899 0 0 Complete Complete Complete On Target On Target
FAIRLIE EARLY YEARS 205,120 205,120 205,120 0 1,470 1,470 0 0 Complete Complete Complete On Target On Target
DREGHORN EARLY YEARS 82,940 82,940 82,940 0 497 497 0 0 Complete Complete Complete On Target On Target
PIRNMILL EARLY YEARS 80,000 71,846 80,000 0 77,510 69,357 (8,154) (8,154) 31-Oct-21 30-Apr-23 Construction On Target On Target
SHISKINE EARLY YEARS 127,013 127,013 127,013 0 70,855 70,855 0 0 31-Oct-21 30-Apr-23 Construction On Target On Target
CORRIE EARLY YEARS 38,606 28,442 38,606 0 36,441 26,883 (9,558) (9,558) 31-Oct-21 01-Aug-23 Defects On Target On Target
LAMLASH EARLY YEARS 15,000 877 15,000 0 195 195 0 0 31-Oct-21 31-Aug-23 Tender On Target On Target
BRODICK EARLY YEARS 354,660 354,659 354,660 0 346,221 346,221 (0) (0) Complete Complete Complete Complete Complete
MARRESS HOUSE 3,560,310 3,560,310 3,560,310 0 1,632,968 1,632,968 (0) (0) 22-Jul-22 31-May-23 Construction On Target Significantly off target result of poor performance by the contractor and continuing issues with the
condition of the existing building
Completed Nursery Education
LAWTHORN EARLY YEARS 201,037 201,037 201,037 0 77 77 (0) (0) Complete Complete Complete Complete Complete
Other Nursery Education
ANNICK PRIMARY EXT - EARLY YRS PROVISION 3,103,415 3,070,354 3,103,415 0 85,309 84,640 (669) (669) Complete Complete Complete On Target On Target
Total Nursery Education 15,918,237 15,799,375 15,918,237 0 2,316,976 2,289,713 (27,263) 0 (27,263)
Primary Schools
MOORPARK PRIMARY 10,849,442 6,536,549 10,849,442 0 3,086,371 3,722,113 635,742 635,742 30-Sep-22 30-Sep-23 Construction Slightly off target  Significantly off target Delays are being experienced by the contractor and wider supply chain.
MONTGOMERIE PARK SCHOOL 23,449,000 1,095,998 23,449,000 0 736,478 945,730 209,252 209,252 30-Apr-24 12-Aug-24 Tender Significantly off target On Target Revised project costs £2.550m above initial budget as reported to Cabinet on
27/4/22
UFSM BRODICK PRIMARY SCHOOL 144,178 121,334 144,178 0 144,178 121,334 (22,844) (22,844) 31-Aug-23 31-Aug-23 Construction On Target On Target
UFSM CORRIE PRIMARY SCHOOL 52,795 52,795 52,795 0 52,795 52,795 0 0 Complete Complete Complete Complete Complete
UFSM LARGS PRIMARY SCHOOL 150,000 148,533 150,000 0 150,000 148,533 (1,467) (1,467) Complete Complete Complete Complete Complete
UFSM SHISKINE PRIMARY SCHOOL 15,000 6,072 15,000 0 3,553 6,072 2,519 2,519 Complete Complete Complete Complete Complete
UFSM WEST KILBRIDE PRIMARY SCHOOL 2,252,504 206,372 2,252,504 0 216,448 206,110 (10,338) (10,338) 31-Mar-24 31-Mar-24 On Site On Target On Target
Total Primary Education 41,255,113 8,167,653 41,255,113 0 4,389,528 5,202,686 813,158 0 813,158 
Secondary Schools
KILWINNING LEARNING ENVIRONMENT 2,805,435 2,427,034 2,805,435 0 127,953 72,632 (55,321) (55,321) 31-Aug-21 31-Mar-24 Construction On Target On Target
ARDROSSAN NEW BUILD 80,205,307 1,489,641 80,205,307 0 591,768 546,004 (45,764) (45,764) 31-Aug-26 31-Aug-26 In Development Slightly off target  Slightly off target  Delayed expenditure linked to anticipated delays and inflationary pressures
linked to the advance works tender process.
Total Secondary Education 83,010,742 3,916,675 83,010,742 0 719,721 618,636 (101,085) 0 (101,085)
Special Education
LOCKHART CAMPUS 25,343,637 25,205,042 25,343,637 0 803,662 665,067 (138,595) (138,595) Complete Complete Snagging On Target On Target
Total Special Education 25,343,637 25,205,042 25,343,637 0 803,662 665,067 (138,595) 0 (138,595)
Schools Other
CO2 MONITORS IN SCHOOLS 298,000 151,457 298,000 0 45,349 45,349 0 0 31-Mar-23 31-Mar-24 Planning On Target On Target
SCHOOLS ICT INVESTMENT * 1,350,363 1,385,343 1,350,363 0 1,350,363 1,385,343 34,980 34,980 31-Mar-23 31-Mar-23 On-going On Target On Target
Total Schools Other 1,648,363 1,536,800 1,648,363 0 1,395,712 1,430,692 34,980 0 34,980
Information & Culture
CASTLES & HISTORIC MONUMENTS 38,303 0 38,303 0 38,303 0 (38,303) (38,303) Holding Code Holding Code Holding Code Holding Code Holding Code
ABBEY TOWER 75,176 6,563 75,176 0 2,549 0 (2,549) (2,549) Autumn 2023 Autumn 2023 Planning On Hold On Hold
Total Information & Cultural 113,479 6,563 113,479 0 40,852 0 (40,852) 0 (40,852)
Completed Projects
GARNOCK CAMPUS 40,307,259 40,304,366 40,307,259 0 2,893 0 (2,893) (2,893) Complete Complete Complete Complete Complete
AUCHENHARVIE SECONDARY ESTATE LEARNING ENVT 3,112,120 3,111,334 3,112,120 0 786 0 (786) (786) Complete Complete Complete Complete Complete
Total Completed Projects 43,419,379 43,415,700 43,419,379 0 3,679 0 (3,679) 0 (3,679)
Total Communities 210,708,950 98,047,807 210,708,950 0 9,670,130 10,206,793 536,663 0 536,663
CAPITAL MONITORING 2022/23
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2022/23 BUDGETS
174

Page 175

CHIEF EXECUTIVE
MILESTONE
Total Project Budget                   
Cumulative
Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Actual
Expenditure to 31
March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/(Under)
Spend          
Brought / Carry
Forward to
2023/24
Original Target Revised Forecast Current Project
Stage
Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £
Council IT Strategy
ICT INVESTMENT FUND 3,732,986 909,733 3,732,986 0 285,000 279,944 (5,057) (5,057) 31-Mar-26 31-Mar-26 On-going On Target On Target
WAN 902,100 402,197 902,100 0 139,297 139,394 97 97 31-Mar-28 31-Mar-28 Implementation On Target On Target
LAN/WiFi 2,673,000 944,162 2,673,000 0 561,816 572,978 11,162 11,162 31-Mar-28 31-Mar-28 Implementation On Target On Target
TELEPHONY 1,146,693 227,643 1,146,693 0 24,988 17,938 (7,050) (7,050) 31-Mar-28 31-Mar-28 Implementation On Target On Target
OUR FUTURE WORKING ENVIRONMENT 41,903 41,722 41,903 0 3,657 3,476 (181) (181) Complete Complete Complete Complete Complete
Total IT Strategy 8,496,682 2,525,457 8,496,682 0 1,014,758 1,013,728 (1,030) 0 (1,030)
Total Chief Executive 8,496,682 2,525,457 8,496,682 0 1,014,758 1,013,728 (1,030) 0 (1,030)   
CAPITAL MONITORING 2022/23
CommentsProject Description
COMPLETION DATESTOTAL PROJECT DELIVERY STATUS2022/23 BUDGETS
175

Page 176

HEALTH & SOCIAL CARE
MILESTONE
Total Project
Budget                   
Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Actual Expenditure to
31 March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/(Under)
Spend          
Brought / Carry
Forward to 2023/24   Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £
Management & Support
HOME CARE SYSTEM 433,917 433,917 433,917 0 42,682 42,682 0 0 Complete Complete Complete Complete Complete
COMMUNITY ALARMS - ANALOGUE TO DIGITAL 996,000 4,190 996,000 0 6,190 4,190 (2,000) (2,000) 31-Dec-23 31-Dec-23 Future Years On Target On Target
CAREFIRST IT SYSTEM 84,620 84,620 84,620 0 0 0 0 0 Complete Complete Complete Complete Complete
CAREFIRST REPLACEMENT 536,058 267,993 536,058 0 168,157 92 (168,065) (168,065) 31-Aug-24 31-Aug-24 In development On Target On Target
ARRAN STAFF ACCOM – GLENARTNEY 702,500 702,500 702,500 0 702,500 702,500 0 0 31-Mar-23 31-Mar-23 Acquisition On Target On Target
Total Management & Support 2,753,095 1,493,221 2,753,095 0 919,529 749,464 (170,065) 0 (170,065)
Housing Non HRA
IMPROVEMENT GRANTS * 506 0 506 0 506 0 (506) (506) 31-Mar-23 31-Mar-23 Ongoing On Target On Target 
Total Housing Non HRA 506 0 506 0 506 0 (506) 0 (506)
Adults
TRINDLEMOSS 4,608,078 4,590,031 4,608,078 0 26,868 28,757 1,889 1,889 Complete Complete Complete Complete Complete
Total Older People 4,608,078 4,590,031 4,608,078 0 26,868 28,757 1,889 0 1,889
Young People
RESIDENTIAL & RESPITE UNIT 5,579,718 5,216,541 5,579,718 0 487,982 124,805 (363,177) (363,177) Complete Complete Snagging On Target On Target
Total Young People 5,579,718 5,216,541 5,579,718 0 487,982 124,805 (363,177) 0 (363,177)
Total Health & Social Care 12,941,398 11,299,792 12,941,398 0 1,434,885 903,026 (531,859) 0 (531,859)
CAPITAL MONITORING 2022/23
2022/23 BUDGETSTOTAL PROJECT COMPLETION DATES
CommentsProject Description
DELIVERY STATUS
176

Page 177

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Actual
Expenditure to 31
March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend         
Brought / Carry
Forward to
2023/4
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £
PHYSICAL ENVIRONMENT
Roads
ROADS IMPROVE/RECONSTRUCTION * 4,814,795 4,767,534 4,814,795 0 4,814,795 4,767,534 (47,261) (47,261) 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
A737 DALRY BYPASS 136,000 129,955 136,000 0 136,000 129,955 (6,045) (6,045) 31-Mar-24 31-Mar-24 In Development On Target On Target
TRAFFIC CALMING 175,000 92,047 175,000 0 100,000 92,047 (7,953) (7,953) 31-Mar-24 31-Mar-24 In Development On Target On Target
VEHICLE RESTRAINT SYSTEM UPGRADE 100,000 100,000 100,000 0 100,000 100,000 0 0 31-Mar-23 31-Mar-23 In Development On Target On Target
LIGHTING * 1,244,770 1,170,485 1,244,770 0 1,244,770 1,170,485 (74,285) (74,285) 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
LED LIGHTING REPLACEMENT 695,000 338,021 695,000 0 329,690 338,021 8,331 8,331 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
A737 DALRY BYPASS LIGHTING 20,685 4,074 20,685 0 6,485 4,074 (2,411) (2,411) 31-Mar-23 31-Mar-23 Preparing Works PackagesOn Target On Target
UPPER GARNOCK FPS 18,503,800 17,435,972 18,503,800 0 3,154,934 2,387,106 (767,828) (767,828) Complete Complete Complete Slightly off target  Slightly off target  The contractor did not achieve the programme before winter. The drainage and
topsoiling/ seeding cannot be completed until next spring
MILLPORT COASTAL FPS 48,599,796 1,840,415 48,599,796 0 1,300,000 575,618 (724,382) (724,382) 31-Aug-24 31-Aug-24 Construction Slightly off target  On Target
MILLBURN FPS 1,757,000 253,471 1,757,000 0 60,000 66,453 6,453 6,453 31-Mar-23 31-Jul-24 Design On Target Significantly off Delays in the design process
MILLPORT PIER 500,000 150,080 500,000 0 0 0 0 0 31-Mar-25 31-Mar-25 In Development On Target On Target
BRIDGES INFRASTRUCTURE PROG * 1,000,000 1,000,570 1,000,000 0 1,000,000 1,000,570 570 570 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
LARGS PROMENADE SEAWALL 3,969,000 333,954 3,969,000 0 191,596 223,326 31,730 31,730 31-Oct-23 31-Oct-23 Tender Slightly off target  On Target Increased tender cost risks identified
B714 UPGRADE 26,063,443 889,259 26,063,443 0 1,212,000 889,259 (322,741) (322,741) 31-Mar-25 31-Mar-25 Outline Design Significantly off target On Target Increased tender cost risks identified
LARGS CAR PARK INFRASTRUCTURE 54,467 54,467 54,467 0 0 0 0 0 Complete Complete Complete Complete Complete
GALLOWGATE TOILETS 275,803 29,650 275,803 0 273,119 26,967 (246,153) (246,153) 31-Mar-23 31-Mar-23 Planning On Target On Target
PARKING CHARGES & DPE 250,610 80,025 250,610 0 2,905 0 (2,905) (2,905) 31-Mar-24 31-Mar-24 In Development On Target On Target
Total Roads 108,160,167 28,669,977 108,160,167 0 13,926,294 11,771,414 (2,154,880) 0 (2,154,880)
Streetscene
CEMETERY EXTNS, WALLS & INFRA * 665,405 0 665,405 0 (52,174) 0 52,174 52,174 Holding Code Holding Code Holding Code Holding Code Holding Code
CMTY, LAMLASH - EXTENSION 715,065 715,065 715,065 0 30,540 30,540 0 0 Complete Complete Complete Complete Complete
CMTY, ARDROSSAN - PLOTS/WALLS 217,922 156,058 217,922 0 55,921 5,355 (50,566) (50,566) Complete Complete Complete Complete Complete
CMTY, KILBIRNIE - WORKS 25,383 25,383 25,383 0 0 0 0 0 Complete Complete Complete Complete Complete
CMTY, KILWINNING - NEW 1,264,528 1,264,528 1,264,528 0 1,176,082 1,176,082 0 0 01-Sep-22 31-May-23 Construction On Target Significantly off Contractor appointed and work commenced
CMTY, KNADGERHILL - EXTENSION 416,471 414,810 416,471 0 22,230 20,569 (1,661) (1,661) Complete Complete Complete Complete Complete
CMTY, WEST KILBRIDE - WORKS 361,142 361,141 361,142 0 322,422 329,928 7,506 7,506 25-Nov-22 28-Feb-24 Construction On Target On Target
CMTY, STEV HIGH ROAD - WORKS 545,429 369,470 545,429 0 365,961 325,642 (40,319) (40,319) 23-Dec-22 30-Apr-23 Construction On Target On Target
ARDROSSAN CEMETERY NEW 900,603 603 900,603 0 0 0 0 0 Future years Future years Future years On Hold On Hold
CMTY, BRODICK - NEW 12,000 7,021 12,000 0 9,521 7,021 (2,500) (2,500) Future years Future years Planning On Hold On Hold
CMTY, KILBIRNIE - WALLS 188,370 15,626 188,370 0 2,043 15,626 13,583 13,583 31-Mar-23 30-Apr-23 Feasibility Works On Target On Target
CMTY, BEITH - WALLS 87,542 14,635 87,542 0 2,533 14,046 11,513 11,513 31-Mar-23 30-Apr-23 Feasibility Works On Target On Target
CMTY, ABBEY TOWER - WALLS 95,550 6,052 95,550 0 3,520 6,052 2,532 2,532 31-Mar-24 31-Mar-24 Feasibility Works On Target On Target
CMTY, STEV HAWKHILL - WALLS 108,732 5,860 108,732 0 1,811 5,860 4,049 4,049 31-Mar-24 31-Mar-24 Feasibility Works On Target On Target
CMTY, WEST KILBRIDE - WALLS 99,528 4,604 99,528 0 2,413 4,604 2,191 2,191 31-Mar-24 31-Mar-24 Feasibility Works On Hold On Hold
CMTY, MILLPORT - WALLS 2,846 2,846 2,846 0 2,846 2,846 0 0 31-Mar-23 31-Mar-23 Feasibility Works On Target On Target
CMTY, ARDROSSAN - WALLS 4,338 4,338 4,338 0 4,338 4,338 0 0 31-Mar-23 31-Mar-23 Feasibility Works On Target On Target
CMTY, IRVINE OP CHURCH - WALLS 2,775 2,775 2,775 0 2,775 2,775 0 0 31-Mar-23 31-Mar-23 Feasibility Works On Target On Target
CMTY, DREGHORN - WALLS 3,260 3,260 3,260 0 3,260 3,260 (1) (1) 31-Mar-23 31-Mar-23 Feasibility Works On Target On Target
CMTY, KILBIRNIE BARONY - WALLS 1,828 1,828 1,828 0 1,828 1,828 (0) (0) 31-Mar-23 31-Mar-23 Feasibility Works On Target On Target
CMTY, LAMLASH - WALLS 3,627 3,627 3,627 0 3,627 3,627 (0) (0) 31-Mar-23 31-Mar-23 Feasibility Works On Target On Target
CMTY, STEV HIGH KIRK - WORKS 22,754 22,754 22,754 0 22,754 22,754 0 0 31-Mar-23 31-Mar-23 Feasibility Works On Target On Target
CMTY, KILBIRNIE - NEW 598,450 11,287 598,450 0 9,223 11,287 2,064 2,064 31-Mar-25 31-Mar-25 Feasibility Works On Target On Target
CMTY, DALRY - WALLS 2,450 2,450 2,450 0 2,450 2,450 0 0 On Target On Target
COASTAL PLAY PARKS 0 0 0 0 0 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
STREET FURNITURE IMPROVEMENT 69,469 69,469 69,469 0 69,469 69,469 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PARK ENABLING WORKS 85,363 85,363 85,363 0 85,363 85,363 (0) (0) 31-Mar-23 31-Mar-23 Planning On Target On Target
RENEWAL OF PLAY PARKS 1,391,000 109,288 1,391,000 0 235,000 109,288 (125,712) (125,712) 31-Mar-23 31-Mar-23 Construction On Target On Target
Total Streetscene 7,891,828 3,680,140 7,891,828 0 2,385,756 2,260,610 (125,146) 0 (125,146)
Transport
VEHICLES * 1,901,045 1,466,418 1,901,045 0 1,901,045 1,466,418 (434,627) (434,627) 31-Mar-23 31-Mar-23 Ongoing On Target On Target
WORKPLACE CHARGERS 318,261 225,403 318,261 0 202,661 109,803 (92,858) (92,858) 31-Mar-23 31-Mar-23 Ongoing On Target On Target
FLEET DECARBONISATION 2,500,000 37,585 2,500,000 0 637,000 37,585 (599,415) (599,415) 31-Mar-23 31-Mar-23 Ongoing On Target On Target
Total Transport 4,719,306 1,729,406 4,719,306 0 2,740,706 1,613,806 (1,126,900) 0 (1,126,900)
Renewable Energy
SOLAR PV RETROFIT EXTENSION 120,000 42,014 120,000 0 78,205 219 (77,986) (77,986) 31-Mar-23 31-Mar-23 Planning On Target On Target
SOLAR PV INVESTMENT - NETHERMAINS 7,289,441 145,681 7,289,441 0 500,000 102,241 (397,759) (397,759) 30-Apr-24 30-Apr-24 Work Ongoing On Target On Target
SOLAR PV INVESTMENT - SHEWALTON 5,540,347 98,110 5,540,347 0 75,640 98,110 22,470 22,470 30-Oct-24 30-Oct-24 Work Ongoing On Target On Target
NON DOMESTIC ENERGY EFFICIENCY PROGRAMME 1,000,000 936,411 1,000,000 0 63,589 0 (63,589) (63,589) 31-Mar-23 31-Mar-23 Work Ongoing On Target On Target
NATURE RESTORATION FUND 356,000 0 356,000 0 0 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
ELECTRIC VEHICLES INFRASTRUCTURE 646,392 646,392 646,392 0 69,574 69,574 0 0 31-Mar-23 31-Mar-23 Various On Target On Target
Total Renewable Energy 14,952,181 1,868,609 14,952,181 0 787,008 270,144 (516,864) 0 (516,864)
CAPITAL MONITORING 2022/23
Project Description
TOTAL PROJECT 2022/23 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
177

Page 178

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Actual
Expenditure to 31
March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend         
Brought / Carry
Forward to
2023/4
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
CAPITAL MONITORING 2022/23
Project Description
TOTAL PROJECT 2022/23 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Office Accommodation
PROPERTY LIFECYCLE INVESTMENT * (6,204) 0 (6,204) 0 (6,204) 0 6,204 0 6,204 31-Mar-23 31-Mar-23 Mulitple projects On Target On Target
PLI CALEY COURT RESOURCE CTR 3,450 3,450 3,450 0 3,450 3,450 (0) 0 (0) Complete Complete Complete Complete Complete
PLI CENTRAL AVE STREETSCENE DEPOT* 64,494 64,494 64,494 0 64,494 64,494 (0) 0 (0) Complete Complete Complete Complete Complete
PLI BEITH CEMETERY 669 669 669 0 669 669 (0) (0) Complete Complete Complete Complete Complete
PLI WHITLEES COMMUNITY CTR 3,916 3,916 3,916 0 3,916 3,916 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE COMMUNITY CENTRE 135,699 135,499 135,699 0 135,699 135,499 (200) 0 (200) Complete Complete Complete Complete Complete
PLI WOODWYND HALL 2,000 1,809 2,000 0 0 1,809 1,809 0 1,809 Complete Complete Complete Complete Complete
PLI PORTLAND PLACE 27,967 0 27,967 0 18,000 0 (18,000) 0 (18,000) 31-Dec-22 30-Jun-23 Planning On Target On Target Planned for w/c 20/03
PLI PADDOCKHOLM DEPOT 10,000 7,754 10,000 0 10,000 7,754 (2,246) 0 (2,246) Complete Complete Complete Complete Complete
PLI WEST BYREHILL DEPOT 160,513 86,979 160,513 0 160,513 86,979 (73,534) 0 (73,534) 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI GOLDCRAIGS DEPOT 136,563 17,968 136,563 0 17,968 17,968 (0) (0) 31-Mar-23 31-Mar-24 Planning On Target On Target
PLI ANNICK PRIMARY SCHOOL 5,959 5,959 5,959 0 5,959 5,959 (0) (0) Complete Complete Complete Complete Complete
PLI ARDEER PRIMARY SCHOOL 2,952 2,952 2,952 0 2,952 2,952 0 0 0 Complete Complete Complete Complete Complete
PLI BEITH PRIMARY SCHOOL 2,300 0 2,300 0 2,300 0 (2,300) 0 (2,300) 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI BLACKLANDS PRIMARY SCHOOL 210,000 178,405 210,000 0 210,000 178,405 (31,595) (31,595) Complete Complete Complete Complete Complete
PLI CALEDONIA PRIMARY SCHOOL 6,646 6,646 6,646 0 6,646 6,646 (0) (0) Complete Complete Complete Complete Complete
PLI DALRY PRIMARY SCHOOL 89,000 20,686 89,000 0 19,907 20,686 779 779 18-Aug-23 18-Aug-23 Planning On Target On Target
PLI DREGHORN PRIMARY SCHOOL 1,500 0 1,500 0 1,500 0 (1,500) (1,500) 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI FAIRLIE PRIMARY SCHOOL 7,374 6,355 7,374 0 7,374 6,355 (1,019) (1,019) Complete Complete Complete Complete Complete
PLI GLENCAIRN PRIMARY SCHOOL 175,759 160,003 175,759 0 175,759 160,003 (15,756) (15,756) Complete Complete Complete Complete Complete
PLI PENNYBURN PRIMARY 415,450 0 415,450 0 3,500 0 (3,500) (3,500) 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI ST BRIDGETS PRIMARY 5,500 4,645 5,500 0 5,500 4,645 (855) (855) 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI SHISKINE PRIMARY 4,266 4,266 4,266 0 4,266 4,266 0 0 Complete Complete Complete Complete Complete
PLI SKELMORLIE PRIMARY SCHOOL 75,000 1,020 75,000 0 0 1,020 1,020 1,020 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI ST JOHN OGILVIE PRIMARY SCHOOL 16,708 16,708 16,708 0 16,708 16,708 0 0 Complete Complete Complete Complete Complete
PLI ST PETER'S PRIMARY 1,971 1,971 1,971 0 1,971 1,971 (0) (0) Complete Complete Complete Complete Complete
PLI WEST KILBRIDE PRIMARY* 325 325 325 0 325 325 0 0 0 Complete Complete Complete Complete Complete
PLI WOODLANDS PRIMARY 5,603 5,603 5,603 0 5,603 5,603 0 0 Complete Complete Complete Complete Complete
PLI AUCHENHARVIE ACADEMY* 821,820 498,739 821,820 0 550,000 498,739 (51,261) (51,261) 31-Mar-23 30-Jun-23 Construction On Target On Target
PLI IRVINE ROYAL ACADEMY* 378,785 11,354 378,785 0 10,171 11,354 1,183 1,183 31-Aug-23 31-Aug-23 Pupil Toilets: Complete AW Pitches: TenderOn Target Significantly off
target
Resource pressures within PMI resulting in this project being delayed
PLI KILWINNING ACADEMY 270,000 81,580 270,000 0 87,677 81,580 (6,098) (6,098) 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI 6A KILWINNING ROAD 7,619 7,619 7,619 0 7,619 7,619 0 0 Complete Complete Complete Complete Complete
PLI LARGS LIBRARY 7,239 7,239 7,239 0 7,239 7,239 (0) (0) Complete Complete Complete Complete Complete
PLI STEVENSTON LIBRARY 5,915 5,915 5,915 0 5,915 5,915 0 0 Complete Complete Complete Complete Complete Works on hold depending on Land and Property review
PLI CUNNINGHAME HOUSE 98,273 3,482 98,273 0 3,482 3,482 0 0 31-Mar-23 31-Aug-23 On Hold On Hold On Hold
PLI H&SCP 47 WEST ROAD 9,555 9,555 9,555 0 9,555 9,555 0 0 Complete Complete Complete Complete Complete
PLI GALT HOUSE 8,593 8,593 8,593 0 8,593 8,593 (0) (0) Complete Complete Complete Complete Complete
PLI ACHNAMARA CHILDREN'S UNIT 29,671 29,671 29,671 0 29,671 29,671 0 0 Complete Complete Complete Complete Complete
PLI THE MEADOWS 5,900 5,482 5,900 0 5,900 5,482 (418) (418) Complete Complete Complete Complete Complete
PLI ANAM CARA 80,000 51,667 80,000 0 50,000 51,667 1,667 1,667 30-Apr-23 31-May-23 Planning On Target On Target
PLI GARNOCK CAMPUS 10,925 10,925 10,925 0 10,925 10,925 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI EGLINTON CASTLE 48,000 0 48,000 0 0 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI THE PORTAL 8,611 7,016 8,611 0 8,611 7,016 (1,595) (1,595) Complete Complete Complete Complete Complete
Total Office Accommodation 3,356,286 1,476,916 3,356,286 0 1,674,133 1,476,916 (197,217) 0 (197,217)
Other Property
INDUSTRIAL PORTFOLIO * 430,713 0 430,713 0 430,713 0 (430,713) (430,713) On Hold On Hold Multiple projects On Target On Target
HOME 4,470,199 288,648 4,470,199 0 100,000 50,533 (49,467) 0 (49,467) On Hold On Hold On Hold On Hold On Hold
BUILD 284,086 46,249 284,086 0 247,284 9,448 (237,837) 0 (237,837) On Hold On Hold On Hold On Hold On Hold
EMERGENCY CONTROL CTR 158,000 1,220 158,000 0 158,000 1,220 (156,780) 0 (156,780) 31-Mar-23 31-Mar-23 In development On Target On Target
GOLDCRAIGS REFURBISHMENT 509,000 25,000 509,000 0 25,000 25,000 0 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
WOODLANDS PRIMARY PLAYINGFIELD DRAINAGE 134,640 106,122 134,640 0 1,246 (1,591) (2,837) (2,837) Complete Complete Complete On Target On Target
Total Property 5,986,638 467,239 5,986,638 0 962,243 84,609 (877,634) 0 (877,634)
Other Housing
CCTV REVIEW 350,000 0 350,000 0 350,000 0 (350,000) (350,000) 31-Mar-23 31-Mar-23 Planning On Target On Target
2-4 BOYLE STREET HOSTEL 120,000 88,975 120,000 0 120,000 88,975 (31,025) (31,025) 12-May-23 12-May-23 Construction On Target On Target
Total Other Housing 470,000 88,975 470,000 0 470,000 88,975 (381,025) 0 (381,025)
178

Page 179

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Actual
Expenditure to 31
March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend         
Brought / Carry
Forward to
2023/4
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
CAPITAL MONITORING 2022/23
Project Description
TOTAL PROJECT 2022/23 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Regeneration
TOWN CENTRE REGENERATION 1,201,660 995,968 1,201,660 0 188,177 122,486 (65,691) (65,691) 30-Sep-22 30-Sep-23 Construction On Target On Target
ISLAND INFRASTRUCTURE FUND 259,000 118,626 259,000 0 259,000 118,626 (140,374) (140,374) 31-Mar-23 31-Mar-23 In development On Target On Target
PBIP 36 BANK STREET 145,000 83,172 145,000 0 100,000 54,573 (45,427) (45,427) 31-Dec-24 31-Dec-25 In development On Target On Target
IRVINE HIGH STREET 2,837,316 2,721,355 2,837,316 0 54,327 49,857 (4,470) (4,470) Complete Complete Complete Complete Complete
MONTGOMERIE PARK MASTERPLAN 3,718,598 1,774,932 3,718,598 0 36,264 32,599 (3,665) (3,665) 31-Mar-30 31-Mar-30 In development On Target On Target
LOCHSHORE, KILBIRNIE 2,011,138 1,641,780 2,011,138 0 1,442,286 1,072,928 (369,358) (369,358) 31-May-25 31-May-25 In development On Target On Target
LOCHSHORE GARNOCK HUB 4,195,999 4,083,770 4,195,999 0 1,377,575 1,265,346 (112,229) (112,229) Complete Complete Complete On Target On Target
VDLF - IRVINE KYLE ROAD SITE PREP* 1,421,110 1,421,110 1,421,110 0 180 180 0 0 Complete Complete Complete Complete Complete
VDLF - KYLE ROAD PHASE 2 267,066 140,840 267,066 0 175,000 119,667 (55,333) (55,333) 31-Mar-24 31-Mar-24 In development On Target On Target
VDLF - ANNICKBANK PH 3* 2,000,220 76,261 2,000,220 0 494,220 19,220 (475,000) (475,000) 31-Mar-24 31-Mar-24 Tender On Target On Target
VDLF - DEVELOPMENT WORK* 347,479 93,467 347,479 0 75,000 44,205 (30,795) (30,795) 30-Sep-23 31-Mar-24 In development On Target On Target
QUARRY ROAD PHASE 2 5,209,497 5,204,719 5,209,497 0 25,301 20,523 (4,778) (4,778) Complete Complete Complete Complete Complete
CYCLING/WALKING/SAFER STREETS * 559,956 793,097 559,956 0 559,956 709,301 149,345 149,345 31-Mar-24 31-Mar-24 Various On Target On Target
ACCESS PATH NETWORK PROGRAMME * 84,833 58,026 84,833 0 84,833 58,026 (26,807) (26,807) 31-Mar-24 31-Mar-24 Various On Target On Target
FAIRLIE COASTAL PATH 49,887 49,887 49,887 0 49,887 49,887 0 0 31-Dec-23 31-Dec-23 In development On Target On Target
PENNYBURN ROUNDABOUT BUS LANE 533 124,201 533 0 533 533 0 0 31-Mar-23 31-Mar-23 Feasibility On Target On Target
IRVINE CYCLE FRIENDLY TOWN 216,198 466,198 216,198 0 216,198 216,198 0 0 31-Mar-23 31-Mar-23 Various On Target On Target
BRODICK TO CORRIE CYCLE PATH 24,987 60,199 24,987 0 24,987 24,987 (0) (0) 31-Mar-23 31-Mar-23 Design On Target On Target
BUS CORRIDOR IMPROVEMENTS 189,042 189,041 189,042 0 114,087 114,087 (0) (0) 31-Mar-23 31-Mar-23 Various On Target On Target
BUS ROUTE CONGESTION MEASURES 710,722 710,722 710,722 0 105,472 105,472 (0) (0) 31-Mar-23 31-Mar-23 Construction On Target On Target
CUMBRAE FERRY & BUS STOP 139,547 139,547 139,547 0 115,857 115,857 (0) (0) 31-Mar-23 31-Mar-23 Design On Target On Target
B714 ACTIVE TRAVEL IMPROVEMENTS 100,000 100,000 100,000 0 100,000 100,000 0 0 31-Mar-23 31-Mar-23 Design On Target On Target
B777 CORRIDOR IMPROVEMENTS 38,400 4,800 38,400 0 4,800 4,800 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SALTCOATS OLD CAL RAILWAY PH1 268,588 55,075 268,588 0 268,588 55,075 (213,513) (213,513) 26-Jun-23 26-Jun-23 Planning On Target On Target
STTS U88 NORTH SANNOX 126,572 126,572 126,572 0 126,572 126,572 0 31-Mar-23 31-Mar-23 Planning On Target On Target
STTS ROSS ROAD ARRAN 221,340 281,245 221,340 0 221,340 221,340 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
Total Regeneration 31,427,633 22,417,236 31,427,633 0 6,932,778 4,822,344 (2,110,434) 0 (2,110,434)
Ayrshire Growth Deal
AYRSHIRE GROWTH DEAL 0 0 0 0 0 0 0 0 31-Mar-26 31-Mar-26 On Target On Target
AGD - I3 DPMC PHASE 1 1,000,000 5,449 1,000,000 0 200,000 0 (200,000) (200,000) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 DPMC PHASE 2 5,000,000 239,415 5,000,000 0 70,000 59,446 (10,554) (10,554) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE 15,000,000 545,423 15,000,000 0 208,000 306,741 98,741 98,741 31-Mar-26 31-Mar-27 Multiple Projects On Target On Target
AGD - HUNTERSTON - CENTRE OF LOW CARBON ENERGY & CIRCULAR
ECONOMY
18,040,001 232,228 18,040,001 0 200,000 46,108 (153,892) (153,892) 31-Mar-26 31-Mar-30 Multiple Projects On Target On Target Project has been reprofiled as part of the overall review of the AGD
programme. Slippage in current year due to work which is underway to clarify
partnership arrangements.
AGD - GREAT HARBOUR 14,164,951 598,089 14,164,951 0 452,909 301,771 (151,138) (151,138) 31-Mar-26 31-Mar-28 Multiple Projects On Target On Target  Masterplan currently under consultation and design works delayed until that
has been concluded.  Programme has been revised across the AGD timeframe
to reflect timing of the three Hubs
AGD - IMSE 10,500,000 133,513 10,500,000 0 174,000 31,253 (142,747) (142,747) 31-Mar-27 31-Mar-30 Design On Target On Target Project has been reprofiled as part of the overall review of the AGD
programme. Work is ongoing with partners to develop the delivery proposal for
this project.
AGD - MARINE TOURISM ARDROSSAN 7,500,000 334,696 7,500,000 0 137,638 123,955 (13,683) (13,683) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - MARINE TOURISM ARRAN 2,025,577 60,484 2,025,577 0 42,255 31,773 (10,482) (10,482) 31-Mar-29 31-Mar-29 Design On Target On Target
AGD - MARINE TOURISM CUMBRAE 2,025,577 68,179 2,025,577 0 44,266 33,618 (10,648) (10,648) 31-Mar-29 31-Mar-29 Design On Target On Target
Total Ayrshire Growth Deal 75,256,105 2,217,477 75,256,105 0 1,529,068 934,665 (594,403) 0 (594,403)
Growth & Investment
ARDROSSAN HARBOUR INTERCHANGE 4,077,112 455,452 4,077,112 0 50,000 65,743 15,743 15,743 31-Dec-24 31-Dec-25 Design Slightly off target  On Target Increased tender cost risks identified
LOW CARBON HUB 1,430,017 112,005 1,430,017 0 123,698 25,204 (98,494) (98,494) 30-Apr-24 30-Sep-24 Multiple Projects On Target On Target Delays in securing landowner permissions for EV works and planning
applications awaited for Path works - both will now carry into 2324 FY
ARDROSSAN NORTH SHORE 41,532,860 2,833,766 41,532,860 0 541,317 536,243 (5,074) (5,074) 30-Apr-24 27-May-24 Tender Slightly off target  Slightly off target  Projected spend increased to include additional site investigations and service
design costs.
VDLF - HARBOUR MASTERS OFFICE 157,711 20,933 157,711 0 211 211 (0) (0) 31-Mar-23 31-Mar-23 Design On Target On Target
VDLF - I3 IRVINE ENTERPRISE 996,981 257,020 996,981 0 129,627 104,192 (25,435) (25,435) 31-Mar-23 31-Mar-24 Design On Target On Target Slippage as Site Investigations for SIC will now take place during 23/24 Financial
Other Growth & Investment 58,940,752 3,679,176 58,940,752 0 844,853 731,592 (113,261) 0 (113,261)
Total Economic Development & Regeneration 165,624,490 28,313,889 165,624,490 0 9,306,699 6,488,601 (2,818,098) 0 (2,818,098)
Completed Projects
ARDROSSAN HOSTEL 15,304 15,304 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 6,355,261 6,314,666 6,355,261 0 15,304 15,304 0 0 0
Total Place 332,055,501 87,149,160 332,055,501 0 32,268,143 24,070,380 (8,197,763) 0 (8,197,764)
179

Page 180

OTHER BUDGETS
AE
Total Project Budget                    Cumulative Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised
Budget 2022/23
Actual Expenditure
to 31 March 2023
Over/ (Under)
Spend for 22/23
£ £ £ £ £ £ £
FLEXIBILITY / IMPROVEMENT FUND 7,704,146 0 7,600,000 (104,146) 104,146 0 (104,146)
CORE INFRASTRUCTURE INVESTMENT 0 0 0 0 0 0 0
Total Other Budgets 7,704,146 0 7,600,000 (104,146) 104,146 0 (104,146)
2022/23 BUDGETS
CommentsProject Description
TOTAL PROJECT
180

Page 181

HRA Capital Statement APPENDIX 2
For the Twelve months to 31 March 2023
Description
Approved
budget 16
February
2022
Current
budget
including
carry
forwards
Approved
Revisions to
programme
Carry forward
(to)/from
future years
Revised
Budget
2022/23
Actual Spend
to
31/03/2023
True Over /
(Under)spend
Delivery Status
Financial
Delivery Status
Physical Comments
£'000 £'000 £'000 £'000 £'001 £'000 £'000
Council House Build Programme
Council House Building General 1,542 1,542 (1,542) (6) (6) (6) - On Target On Target
Acquisition Of Houses On Open Market 720 526 210 (219) 517 517 - On Target On Target
New Build Corsehillhead 1,450 600 - (543) 57 57 - On Target Slightly off target  Expected completion Winter 2024
New Build Brathwic Terrace 18 168 109 3 280 155 (125) On Target Complete Completed - final properties were handed over in June 2022
New Build Flatt Road Phase 1 1,712 1,072 (291) (241) 540 540 - On Target Complete Completed - final properties were handed over in December 2021.
New Build Towerlands 25 160 20 3 183 174 (9) On Target Complete Completed - final properties were handed over in March 2022.
New Build Kinnier Road 3 2 (2) - - - - Complete Complete Completed - properties were handed over in October 2021.
New Build St Colms 1,896 782 367 30 1,179 1,145 (34) Complete Complete Completed - properties were handed over in September 2022
New Build St Michaels Wynd - 592 403 26 1,021 1,118 97 On Target Complete Completed - final properties handed over in August 2022.
New Build Harbourside Irvine 6,460 6,000 (237) (728) 5,035 5,035 - On Target Slightly off target  Completed - final properties were handed over during April 2023.
New Build Afton Court 910 1,080 139 (626) 593 593 - On Target Slightly off target  Expected completion Summer 2023.
New Build Caley Court 1,769 1,843 - (282) 1,561 1,561 - On Target Slightly off target  Completed - properties were handed over January 2023.
New Build Springvale Saltcoats - 133 8 (1) 140 49 (91) On Target Complete Completed - properties were handed over in November 2021.
New Build Dalrymple Place - 101 - 4 105 88 (17) On Target Complete Completed - properties were handed over in October 2021.
New Build St Beya Millport 6 53 - - 53 51 (2) On Target Complete Completed - properties were handed over in July 2021.
Garnock Academy Site 7,950 1,800 (1,700) (25) 75 75 - Slightly off target  Slightly off target  Tender stage. Expected completion Spring 2025. 
Largs police Station 1,908 1,600 105 (299) 1,406 1,406 - On Target Slightly off target  Demolition complete. Expected completion Summer 2023.
Ayrshire Central Site 9,497 1,500 (1,400) 17 117 117 - On Target Slightly off target  Pre-planning stage. Expected completion Spring 2026.
Bourtreehill Village 2,000 25 - (8) 17 17 - On Target Slightly off target  Pre-planning stage. New completion date to be established. 
James McFarlane ASN Site 3,050 2,250 (2,150) 25 125 125 - On Target Slightly off target  Consultation stage. Expected completion Summer 2024.
James Reid ASN school 6,050 1,125 (1,005) 120 240 240 - On Target Slightly off target  Consultation stage. Expected completion Winter 2024.
Stanecastle ASN School 3,300 1,850 (1,750) (7) 93 93 - On Target Slightly off target  Consultation stage. Expected completion Summer 2024.
Fullarton Street 4,090 25 - (2) 23 23 - On Target Slightly off target  Demolition of existing flats expected to complete in Summer 2023. Expected completion 2025.
New Build Montgomerie Park 10,900 1,500 (1,450) (14) 36 36 - On Target Slightly off target  Pre-planning stage. Expected completion Winter 2026.
Glebe Place 10 50 (25) (25) - - - On Target On Target New build project deferred until 2025/26
Regeneration Project 1e 15 5 - (5) - - - On Target On Target Pre-planning stage.
Unallocated Regeneration Block 1 55 - - - - - - On Target On Target Pre-planning stage.
Laburnum Avenue (Regen 1a) 160 5 5 (10) - - - On Target On Target Pre-planning stage.
Newhouse Drive (Regen 1b) 175 5 (5) - - - - On Target On Target Pre-planning stage.
Regeneration Project 1d 360 5 - (2) 3 3 - On Target On Target Pre-planning stage.
Contingency 1,163 8,820 (8,820) - - - -
CONNEL COURT (49) 50 (1) - - - Complete Complete
GARRIER COURT (56) 57 (1) - - - Complete Complete
Harbour Street 5 5 5
Total For Council House Build Programme 67,194 35,114 (18,904) (2,812) 13,398 13,217 (181)
181

Page 182

Description
Approved
budget 16
February
2022
Current
budget
including
carry
forwards
Approved
Revisions to
programme
Carry forward
(to)/from
future years
Revised
Budget
2022/23
Actual Spend
to
31/03/2023
True Over /
(Under)spend
Delivery Status
Financial
Delivery Status
Physical Comments
£'000 £'000 £'000 £'000 £'001 £'000 £'000
Improvement to Existing Homes - Building Services
Window Replacement 325 364 (204) 2 162 162 - On Target On Target
Bathroom Programme 75 75 201 997 1,273 1,273 - On Target On Target
Kitchen Programme 2,610 4,450 (159) 297 4,588 2,288 (2,300) On Target Slightly off target  Additional underspend showing due to previous years underspend not required.  Previous years uncompleted units
were included in the revised business plan last year, therefore already accounted for.
Bathroom Programme Voids - - 991 (855) 136 136 - On Target On Target
Kitchen Programme Voids - - 1,145 (1,018) 127 127 - On Target On Target
Door replacement programme 2,191 2,191 (2,191) - - - - Significantly off
target
Significantly off
target
Door replacement programme - tender has been re-issued following specification review due to unviable costs. 
Balance of budget requires to be earmarked for 2023/24.
Sheltered Housing Units 8,531 8,495 (8,245) (63) 187 187 - Significantly off
target
Significantly off
target
Projection reduced due to Procurement Issues and external contractor issues - remaining budget to be carried
forward to 23/24.  Spend this financial year will only be consultants and staff costs. Construction estimated to
commence late 22/23. Tender for Barnett returned and checking quality.
Saltcoats MSF Investment 4,767 1,881 (698) 13 1,196 1,196 - On Target Significantly off
target
Additional works required.  Expected completion Summer 2023.
Total For Improvements to Existing Homes - Building Services
18,499 17,456 (9,160) (627) 7,669 5,369 (2,300)
Improvement to Existing Homes - External Contractors
Central Heating 2,524 4,442 (1,756) 132 2,818 2,176 (642) Significantly off
target
Significantly off
target
Underspend showing due to previous years underspend not required.  Previous years uncompleted units were
included in the revised business plan last year, therefore already accounted for.
Insulated Re-Rendering 421 865 1,756 (1,048) 1,573 1,573 - Significantly off
target
Significantly off
target
Budget vired from roofing & rerendering to offset additional spend in insulated render. Following contractor surverys
some wall/floor render has been reprofiled as EWI and virement approved.  The discorvery of asbestos delayed works
in to 2023/24.
Electrical Rewiring 698 1,742 - 16 1,758 264 (1,494) Significantly off
target
Significantly off
target
Underspend showing due to previous years underspend not required.  Previous years uncompleted units were
included in the revised business plan last year, therefore already accounted for. Also issues with contractor labour
shortages and no access.
Total For Improvements to Existing Homes - External
Contractors
3,643 7,049 - (900) 6,149 4,013 (2,136)
Refurbishment Schemes
Refurbishment Schemes - - - - - - -
Roofing & Rendering 4,450 5,507 - (478) 5,029 3,195 (1,834) Significantly off
target
Significantly off
target
Uncompleted units from previous years accounted for in future years. Previous years carry forward not required.
Following contractor surverys some wall/floor render has been reprofiled as EWI and virement approved.
Demolition High Flats Irvine 6,780 3,000 (2,033) (295) 672 672 - Slightly off target  Slightly off target  Tender received lower than budget estimate. Demolition contractor appointed and onsite, demolition expected to
complete in Summer/Autumn 2023.  Balance of budget requires to be earmarked for 2023/24.
Kings Arms Project 265 600 (441) (23) 136 136 - On Target Slightly off target  Tender stage.  Works are expected to commence summer/ autumn 2023.
Refurb Maress House - (12) 13 (1) - - - On Target On Target HRA contribution to the project complete.
Refurb Friars Lawn - 254 - (230) 24 24 - On Target Complete Complete - practical completion achieved during April 2023
Glebe Place Refurb (Ukraine) - 521 521 573 52
Total For Refurbishment Schemes 11,495 9,349 (2,461) (506) 6,382 4,600 (1,782)
-
Other Capital Works
Energy Efficiency Standard 5,362 5,488 (5,489) 1 - - - On Target On Target
Other Capital Works 726 712 (711) (1) - - - On Target On Target
Major Improvements 6 6 (6) - - - - On Target On Target
Parkhall & Kirkhall Asbestos - 17 - (17) - - - On Target On Target
Detection Equipment 458 1,463 (1,313) 48 198 198 - Slightly off target  Slightly off target  Contractor continuing to work through addresses, forced entries process in place / limited capacity due to staff issues
(contractors) will span 2 years.  Balance of budget to be earmarked for 2023/24.
Solar Panels 3,862 3,888 (1,813) (348) 1,727 1,727 - On Target On Target
Professional Management Charges 1,326 1,738 - (1,738) - - - On Target On Target
Estate Based Regeneration 1,287 2,190 (1,187) 384 1,387 1,387 - Slightly off target  Slightly off target  Programme currently being revised.  Balance of budget to be earmarked for 2023/24.
Nelson Street Regeneration 442 451 (426) (25) - - - Significantly off
target
Significantly off
target
Final property obtained through CPO. Feasibility exercise being undertaken.  Balance of budget to be earmarked for
2023/24.
Health and Safety Works 207 207 (207) - - - - On Target On Target
Total For Other Capital Works 13,676 16,160 (11,152) (1,696) 3,312 3,312 -
TOTAL EXPENDITURE 114,507 85,128 (41,677) (6,541) 36,910 30,511 (6,399)
182

Page 183

Description
Approved
budget 16
February
2022
Current
budget
including
carry
forwards
Approved
Revisions to
programme
Carry forward
(to)/from
future years
Revised
Budget
2022/23
Actual Spend
to
31/03/2023
True Over /
(Under)spend
Delivery Status
Financial
Delivery Status
Physical Comments
£'000 £'000 £'000 £'000 £'001 £'000 £'000
Sale Of Assets - - - - (5) (5)
CFCR (12,209) (12,209) - - (12,209) (12,209) -
Capital Grants (14,175) (7,138) 5,371 (1,382) (3,149) (3,149) -
Affordable Housing Contribution (1,596) (1,596) 1,046 (550) (550) -
Prudential Borrowing (85,376) (63,034) 36,306 6,297 (20,431) (14,027) 6,404
Council House Build Fund (1,151) (1,151) 580 (571) (571) -
TOTAL INCOME (114,507) (85,128) 41,677 6,541 (36,910) (30,511) 6,399
NET EXPENDITURE - - - - - - -
The following classifications have been used to highlight financial performance against budget
On Target On Target (+0.5% of budget) On Target (up to  5% delay of original timescales)
Slightly off target  Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less) Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target Significantly off target (+2% or more of budget, or £0.500m, whichever is less) Significantly off target (+10% or more of original timescales)
183

Page 184

184

Page 185

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Cost of Living Crisis 
Purpose:  To provide a second progress report to Cabinet in relation to the
North Ayrshire Council responses to the current cost-of-living
crisis and associated investments and funds. 
Recommendation:  It is recommended that Cabinet: 
a) Notes the progress the Council has made in developing
support in relation to the cost-of-living crisis; and 
b) Agrees to accept future progress reports on the investments,
funds and activity associated with the cost-of-living crisis.   
1. Executive Summary 
1.1 North Ayrshire Council is designing and delivering a range of investments and initiatives
to mitigate the impacts of the current cost-of-living crisis for its residents. 
1.2   Further to an initial report to Cabinet on 22nd November 2022, this report provides a
comprehensive overview of the current investments, funds, and activity relevant to the
cost-of-living crisis, progress to date and next steps. This report will continue to form the
basis of future six-monthly reports and progress will continue to be reported to Cabinet
on a regular basis. 
2. Background 
2.1 The current cost-of-living crisis has resulted in a series of challenges for residents,
communities, and businesses in North Ayrshire. The ongoing impact of the pandemic,
the war in Ukraine and economic unpredictability, compounded by the energy crisis,
increased inflation and increased interest rates has resulted in higher household prices
which have created hardship and financial exclusion for citizens, including North
Ayrshire residents. 
2.2 In August 2022, Monetary Policy Report, the Bank of England Monetary Policy
Committee noted that the risks around its projections from both external and domestic
factors were exceptionally large, given the very large increase in wholesale gas prices
since May and the consequent impacts on real incomes for UK households and on
Consumer Price Index (CPI) inflation. 
Agenda Item 10
185

Page 186

2.3 More recent assessments by the Office for Budget Responsibility indicate that
consumer price inflation (CPI) will fall steadily throughout 2023, but with wage growth
expected to stagnate or fall over the next year, many households will continue to
struggle. The Bank of England thinks inflation peaked last year and expects it to keep
falling in 2023 to around 4% by the end of the year. 
2.4    North Ayrshire now has the 7th lowest employment rate, an improvement on the 2nd
lowest  in Scotland (73.6%) compared to a Scottish average of 74.4%.
2.5   The North Ayrshire rate for claimants as a proportion of the working age population
(aged 16-64) is 4.6%. This compares to regional figures of 4.3% for East Ayrshire and
3.7% for South Ayrshire and a Scottish average of 3.3%. This dataset is for March 2023
and shows the rate has remained the same compared to other areas where figures
have increased. 
(Source: Dataset Selection - Query - Nomis - Official Census and Labour Market Statistics
(nomisweb.co.uk))
2.6   North Ayrshire’s vulnerability to the current economic crisis provides the context for the
updates to Cabinet in relation to current national and local interventions.
UK Government Response
2.7  The UK Government has committed to providing over £37 billion additional support   
this year: 
• The Energy Bill Scheme will ensure that 29 million households across the UK will
receive a £400 non repayable discount on energy bills. In addition, 1.1 million families
who are in receipt of tax credits across the country received a cost-of-living payment of
£326, through till March 2023.The Energy Price Guarantee is designed to ensure a
freeze on energy bills and typical households will pay not more than £2,500 annually.
The Energy Price Guarantee has been extended at the same level for an additional 3
months to the end of June 2023.
• All pensioner households received an extra £300 to help them to cover the rising cost
of energy this winter. 
• More than 8 million households on means tested benefits received a payment of £650
including those who receive Universal Credit, Income-based Jobseekers   Allowance,
Income-related Employment Support Allowance, Income Support, Working Tax Credit,
Child Tax Credit and Pension Credit. Most people on DWP benefits received the next
cost of living payment between April 25, 2023 and May 17, 2023.
• People with disabilities received an extra £150 to help with the particular extra costs
they face. 
• The National Insurance contribution threshold has risen to £12,570.
• Households who do not pay for gas or electricity from the mains will receive support.
• Support for businesses targets the most vulnerable industries. 
186

Page 187

Scottish Government Response
2.8 In March 2022 and in response to the cost-of-living crisis, the Scottish Government    
announced additional financial support to low-income households through a cost-of-
living credit of £150 on 2022/23 Council Tax bills.
2.9 The Scottish Government published the Programme for Government 2022 – 2023
with measures to address longer term challenges, provide urgent support and help
tackle the current cost-of-living crisis.
2.10 Support includes the following:
• For anyone in receipt of the Scottish Child Payment, an automatic increase to £25 per
week has been in place from 14 November 2022. Applications for the Scottish Child
Payment are also open to all eligible under 16s from that date, with all payments
backdated to the date of application. 
• Bridging Payments delivered immediate financial support to low-income families with
school age children worth £130 in October and December 2022 were doubled to £260.
• Legislation to ensure the Best Start Grant is paid automatically to eligible families in
receipt of Scottish Child Payment without the need to apply.
• Introduction of the new Winter Heating Payment allowance which guarantees a £50
annual payment to around 400,000 low-income households.
• Doubling of the Fuel Insecurity Fund to £20 million in 2022-23, to help households at
risk of self-disconnection or self-rationing their energy use.
• Widening eligibility for the Tenant Grant Fund, to support those struggling with
increasing costs.
• Giving local authorities more flexibility to take account of energy bills in their
prioritisation of households for Discretionary Housing Payments. Funding for
Discretionary Housing Payments is increased by £5 million.
• Legislation was introduced to reduce hardships particularly for those in rented
accommodation by freezing rents for six months. The Scottish Government has
confirmed that the measures will continue past these dates, with amendments. From 1
April 2023 until 30 September 2023, a new rent cap of 3% in most instances - or up to
6% for prescribed costs - will apply to the private rented sector. The eviction restrictions
will also remain in place.
• In December 2022, North Ayrshire received £63,000 revenue and £17,000 capital
funding from the Scottish Government Island Cost Crisis Emergency Fund. 
North Ayrshire Response 
2.11 Governance 
2.11.1 In June 2022 Cabinet agreed to set up a new Board to tackle child poverty. With the
escalation in cost-of-living concerns this board now also oversees the Council’s
response to the current cost-of-living crisis. The board is chaired by the Council Leader.
The strategic approach to the themes in relation to child poverty and cost-of-living are
agreed by the Board and explored in conjunction with Community Planning, third sector
partners and residents. 
187

Page 188

2.11.2 A consistent approach to identifying actions is ensured by the following approach 
2.11.3 Themes explored to date are: 
• No Wrong Door
• Employability
• Food 
Two place-based mini-enquiries have been concluded on Arran and Cumbrae to align
with the Scottish Government Island Cost Crisis Emergency Fund. 
A mini-enquiry on childcare is planned for 25th May 2023. 
The outputs from this work have informed the three-year Child Poverty strategy and
annual report which will be presented to Cabinet in June 2023 and will contribute to
regular updates to Cabinet on the cost-of-living crisis and related expenditure. 
188

Page 189

2.11.4 The Council has made substantial investments in tackling child poverty and the cost-
of-living crisis. The most recent of these have been agreed in Cabinet reports of June
2022, August 2022 and the budget of March 2023, where the Cost of the School Day
fund was replaced by the Child Poverty and Cost of Living Fund. This provides £400k
per annum for three years to honour existing commitments in relation to digital devices,
fund developments in community transport and provide support for actions directed by
the Child Poverty and Cost of Living Board. 
2.11.5 This Cabinet report brings together an overview of these investments, the funds that
North Ayrshire administers locally on behalf of Scottish Government or Department for
Work and Pensions (DWP) which have an impact on the costs of living, progress in
relation to intended impacts and timetables for future progress against the funded
actions. The funds have been organised thematically and this approach reflects the
support we also offer to residents through the Council’s web presence at: www.north-
ayrshire.gov.uk/cost-of-living. 
2.11.6 Future regular reports to Cabinet will provide further updates on these funds and
related activity as outlined at Appendix 1. 
2.12 Cost-of-living Themes and Investments 
2.12.1 The themes are as follows: 
Energy Advice and Support 
Food, Clothing and Essentials 
Finance and Benefits 
Children and Families 
Health and Wellbeing 
Business and community including transport for work 
Support for Communities 
Workforce wellbeing 
2.12.2 Further detailed information about the funding associated with the above themes is
contained in Appendix 1, as well as progress in relation to expenditure, future plans
and timescales.  
189

Page 190

2.13 Cost-of-living Funding and Activities: Update on current investments 
The following is a summary of the significant additions and changes since the previous
report. Further detail is included at Appendix 1: 
2.13.1 EnergySmart: allocation at the Council budget of 1st March 2023 of underspend in 
excess of £1m – value TBC – at the end of financial year 2022-23. 
2.13.2 Early Intervention Fund – Child Poverty and Cost of Living: one off investment 
over three years (replaces Cost of School Day budget): allocation at the Council 
budget of 1st March 2023: £1.4m. 
2.13.3 Financial Inclusion: £100k additional investment (included within the £1.4m 
outlined at 2.13.2 above). 
2.13.4 Financial Inclusion: Community Investment Fund (CIF) allocation of £45,767 to 
CHAP for community-based outreach advice services: approved by Cabinet on 24th
January 2023. 
2.13.5 Community transport initiative: £100k investment (included within the £1.4m 
outlined at 2.13.2 above). 
2.13.6 P4 – P5 Free School Meals / Holiday Meals: Scottish Government funding: 
£2.272m.
2.13.7 Island Cost Crisis Emergency Fund: Scottish Government funding: £63k revenue 
and £17k capital. 
2.13.8 Parental Employment Support Fund (PESF): Scottish Government funding: 
£282,132. 
2.14 Further detailed information about the funding associated with the above themes is 
contained in Appendix 1, as well as progress in relation to expenditure, future plans
and timescales. This will continue to form the basis of future associated six-monthly
updates to Cabinet. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Notes the progress the Council has made on developing support in relation to the cost-
of-living crisis; and
b) Agrees to accept future progress reports on the investments, funds and activity
associated with the cost-of-living crisis.
190

Page 191

4. Implications/Socio-economic Duty
Financial 
4.1 There are no direct financial implications as a result of this report. 
Human Resources 
4.2 There are no direct HR implications as a result of this report. 
Legal 
4.3 There are no direct legal implications as a result of this report. 
Equality/Socio-economic 
4.4 The purpose of the current report is to provide an overview of the measures which that
Council has taken or delivers to mitigate the impacts of the cost-of-living crisis on our
most vulnerable residents. 
Climate Change and Carbon 
4.5 This report includes information on the Energy Smart scheme which aims to reduce fuel
poverty and increase affordable warmth, whilst reducing carbon emissions and
providing local employment opportunities. 
Key Priorities 
4.6 The proposals impact on the following: 
• Active and strong communities 
• Children and young people experience the best start in life 
• Inclusive, growing, and enterprising local economy 
• People enjoy good life-long health and well-being 
• Effective infrastructure and digital connectivity 
• Affordable, modern, and well-designed homes that meets residents’ needs 
• A sustainable environment 
Community Wealth Building 
4.7 Community Wealth Building is an approach to developing more resilient local
economies.  First initiated in response to a previous economic crisis in USA, it has
gained substantial global momentum as an approach to local economic
development.  North Ayrshire Council has led the way in Scotland with the first
Community Wealth Building Council strategy and the establishment of the Ayrshire
CWB Commission.  CWB is based on the premise that over time the development of
more resilient and sustainable local economy will require fewer reactive interventions in
response to future economic, environmental or social crises.    It is recognised that as
part of the council’s comprehensive approach to CWB, short-term measures taken to
mitigate the effects of the costs of living crisis will contribute to our medium and longer-
term goals of developing a more resilient economy. A recent discussion at NAC CWB
Expert Panel emphasised these points and advised where possible efforts should focus
191

Page 192

on supporting the long-term transition of our local economy, scaling up and joining up
to drive the change that is needed.  There are a wide range of initiatives and actions
across each of the pillars which will mitigate the cost-of-living crisis including:
• Fair Work – supporting the update of the Real Living Wage and improving job security
for employees.
• Procurement – development of local supply chains and strengthening the local
company business base
• Plural ownership – evidence shows that cooperatives and other forms of plural
ownership are more resilient through periods of economic shocks than shareholder-
based businesses, in addition to contributing to addressing social and economic
inequality.
• Financial Power - Work with partners including credit unions to encourage progressive
finance 
The forthcoming CWB legislation and the new Ayrshire regional economic strategy will
further strengthen this approach. 
5. Consultation 
5.1 A wide range of partners and residents have been consulted in the development of the
interventions included in the report and improvements to delivery of services has
resulted. The ongoing mini enquiries, on themes such as the “No Wrong Door”
approach, are contributing to interventions and service design. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Audrey Sutton, Executive Director (Communities
& Education), on (01294) 324308. 
Background Papers
Appendix 1:  Cost of Living Themes & Updates (April 2023) 
192

Page 193

1 
Energy Advice and Support 
Food, Clothing and Essentials
Finance and Benefits
Children and Families 
Health and Wellbeing
Business and Community including transport to work
Support for Communities
Employee Wellbeing
North Ayrshire Council Cabinet
Cost of Living Themes and Updates – April 2023
Appendix 1
193

Page 194

2 
Community based energy support
1. Description of
funding stream,
date and amount
£1.726m Energy Smart Scheme was secured from funds as part of the 2022/23 Council budget setting process. 
The £1.726m investment was supplemented by an additional £0.450m to support the crisis payment element of the scheme by Cabinet
on 23 August 2022. 
At the Council budget of 1/3/23, a further commitment to invest any year end underspend in excess of £1m – value TBC – was agreed.
2. Intended impact The key objective is to support residents of North Ayrshire through the cost-of-living crisis by reducing fuel poverty and increasing
affordable warmth, whilst reducing carbon emissions and providing local employment opportunities as part of the programme.
3. Progress to date
against
milestones,
including
expenditure
There are three elements of the Council’s Energy Smart programme, and an update on each is provided below. 
− The launch of a partnership with the Energy Agency to signpost households to free and impartial advice through the
Home Energy Scotland helpline 
• The partnership was launched on 19 September 2022 and 1,991 North Ayrshire households have received energy advice since
that date to help lower their bills. 
− The creation of a £450,000 fund to offer one-off emergency support payments towards energy bills for low-income
families 
• The Energy Smart Emergency Support scheme launched on 31 October 2022 to provide assistance over the 2022/23 winter period.
Our communication and promotion activities undertaken included a number of press releases highlighting the initiative to local media
which was carried by the five regional newspapers and local radio stations. We also carried repeated promotion on our social media
channels (Twitter, Facebook, LinkedIn) with details on how to apply with links. The scheme featured as part of our Christmas social
media campaign which signposted a number of ways in which households could get extra help in the run-up to the festive season.
In addition, the following steps were taken:   
• Posters and awareness materials were provided to various locations including the 14 food larders, libraries, community centres,
GP surgeries, churches and community shops;
• Information shared with schools via head teachers;
• Information shared with Council employees through message on payslips;
• Display screens in libraries and offices were used to promote the scheme; and 
Energy Advice and Support
194

Page 195

3 
• To date, the Council has supported over 1,300 households facing pressure from rising utility bills through the Emergency Smart
Emergency Support scheme. 
− The creation of a £1.726 million fund to carry out home improvements to improve energy efficiency and reduce
energy bills 
• The initial phase of support launched in January 2023, targeting low-income households who may be eligible for top-up loft insulation.
The second phase of support is in the process of being procured and will offer a wider range of energy efficiency measures and is
anticipated to launch in June 2023. In addition, we have also provided 900 LED bulbs to the 14 food larders to help reduce energy
consumption in homes. 
4. What difference
has the
investment
made? 
The following Key Performance Indicators (KPIs) will monitor the success of the programme:
1) Number of households in fuel poverty helped with energy efficiency advice. 
2) Number of households in receipt of crisis support.  
3) Number of households granted financial assistance for energy efficiency measures.  
4) Estimated annual savings on fuel bills.
5) Carbon emissions saved through installing energy efficiency measures.  
5. Next steps and
timescales
Appoint a contractor to deliver multiple energy efficiency measures in homes in June 2023.
6. Comments The Energy Smart model aims to support residents of North Ayrshire through the cost-of-living crisis by reducing fuel poverty and
increasing affordable warmth, whilst reducing carbon emissions.  Delivery of the sustainability initiative is being implemented across three
stages and incorporating energy efficiency and low carbon behaviour advice, crisis support payment and implementation of physical
energy efficiency measures. 
195

Page 196

4 
Citrus Energy
1. Description of
funding stream,
date and amount
Fuel Poverty - increase capacity in Citrus Energy
Fund - Tackling Financial Insecurity: Scottish Government Funding: £0.060m
Date awarded -    15/06/2021 
2. Intended impact  Increased capacity in Citrus Energy allowed the organisation to deliver the additional support in the Garnock Valley and Irvine and
deliver much needed energy advice to local communities. 
3. Progress to date
against milestones,
including
expenditure 
The additional capacity was for a 12-month period and the allocation was fully spent. 
At its budget of March 2023 Council approved any balance of underspend in 2022/23 beyond £1m to be used to provide funding for
further emergency support payments to citizens to help with their energy bills. This funding will be in addition to the previously secured
£450,000,
4. What difference has
the investment
made? 
Additional information and advice has been provided at a critical time for residents seeking support.
5. Next steps and
timescales 
As 3. above
6. Comments This piece of work was initiated as a result of learning from the pandemic. 
196

Page 197

5 
Fairer Food
1. Description
of funding
stream, date
and amount 
Fairer Food System 
Fund: Recovery and Renewal Investment Fund - £0.150m 
Support to Fairer Food Network 
Fund: Tackling Financial Insecurity SG – 2021/22 Winter - £0.247m 
North Ayrshire Fairer Food Network 
Fund: North Ayrshire COVID Economic Recovery Fund - SG Funding - £0.142m Community Food Network 
Fund: Original Investment Fund - £0.500m
Cost of School Day Food allocation: £150,000 
2. Intended
impact
The prevention of food poverty through the provision of food with dignity. The aim is to reduce the cost of the weekly shop, not to provide a
full shop, so that family budgets go further. This minimises pressure on the foodbank. Funding has been used for food vouchers during
holidays and the provision of warm clothing/footwear/outdoor wear and basic household items, such as toiletries. It also includes support
for self-isolation on islands, mental health, energy, and money advice.
3. Progress to
date against
milestones,
including
expenditure
A network of community food larders has been established with North Ayrshire Fairer Food branding.  The Council provides support in food
safety, health and safety and other regulations.  The NA Fairer Food Network of community food providers meet regularly and have been
co-developing, sharing good practice and piloting bulk-buying, as well as establishing community benefit partnerships. 
Fairer Food System 
Allocation fully spent.  This was the initial funding allocation that started off the establishment of the network.  Expenditure included
shelving, tills, resources for cooking & food preparation areas, initial stock, branding, fridges, freezers, chill cabinets etc. £0.150m 
Support to Fairer Food Network
• NA Food Resilience (Community Hubs and NA Foodbank) Peripatetic Support Officer supports the transportation of supplies such as
emergency parcels, larder top up stock, delivery, and uplifts of stocks/equipment/materials across all sites.  Funding to cover
additional Venue Assistants for food support at Whitlees Centre.  Emergency stock supplies and equipment investment for emergency
situations including BBQs for each larder site.  Additional urns, crockery and twelve months Foodbank Co-ordinator and cook costs:
£0.077.
• Food Larder Development: Top up for winter food supplies, marketing and promotion, equipment and adaptations, training of staff –
The Royal Environmental Health Institute of Scotland (REHIS), Elementary Food Hygiene, Financial Regulations: £0.143m.
• Community Cafes: Costs for food, supplies to host free soup days, coffee mornings or similar targeting financially vulnerable and
isolated. Investment in equipment within Community Cafes:  £0.027m. 
Food, Clothing and Essentials
197

Page 198

6 
North Ayrshire Fairer Food Network 
The North Ayrshire Fairer Food Network is our local alternative to foodbanks and is aimed at addressing food insecurity in a dignified way. 
Further development of the larders and shops will support low income residents by developing and improving the sustainability of the
existing network. 
New initiatives and business models include community fridges, community cafes, social enterprises based on growing produce and better
links across providers. It will also focus on support for the islands communities so that approaches are developed which fit their specific
needs: £0.142m. 
Cost of the School Day (Food element) 2021/22
• Reusable water bottles were purchased for all North Ayrshire school pupils.  Water bottles reduce the need for pupils to purchase
single-use plastic liquids during the school day.  Providing all pupils with a water bottle reduces stigma and promotes healthy
practices.  It is also more environmentally friendly.  
• Those accessing Community Larders with school aged children were provided with supplementary food items linked to the cost of the
school day.   
Cost of the School Day (Food element) 2022/23 
Planning with community larder network and partners is ongoing to address the particular issues created by the cost-of-living crisis. 
Ongoing NAC support to North Ayrshire Fairer Food Network External consultants have recently completed a review of the larder models,
which vary depending on the local aims of the community organisation. The NA Fairer Food Network has agreed a model with should
sustain current demand for 3 years, supported by the allocation of £500,000 from Cabinet. 
The payment model to distribute this funding will provide a quarterly payment for 12 quarters dependant on the larder footfall, which breaks
down as follows: 
Up to 24 weekly appointments, £500 per quarter. 
Between 24 and 49 weekly appointments, £1,000 per quarter.
Between 50 and 99 weekly appointments, £2,000 per quarter. 
Over 100 weekly appointments, £3,000 per quarter 
The first quarterly payment was made in January 2023 and covered a four month period from Dec 22 – March 23 to allow for a standard
reporting period. The first payments totalled: £27,994.33 and supported 14 larders across the authority. This model allows capacity to
expand as the cost-of-living crisis continues and more families and households need to access the provision. We anticipate continued
growth in weekly appointments over the coming months. 
The second payment run will be in April 23 and will be based on the footfall from Jan – Mar 23 and will support 15 larders as Eco Savvy on
Arran now has a subsided food model running in conjunction with their Zero Waste café’s on the island. This will be included in the next
payment run in April. 
198

Page 199

7 
It was also agreed that £100k of the £500k be held in reserve to support any new larder set ups and infrastructure development. 
4. What
difference
has the
investment
made? 
15 Community Larders are operational.
Network support group meets quarterly, and members are part of a communication group for peer support.
Weekly footfall across the Larders – 850 per week (families/members). 
Membership is far greater than the weekly footfall estimated: c2000- 3000. 
“The people coming in are from all demographics, from those working to those on benefits.”
“The groups have become experts in where to buy and how to get the best value for money from supermarkets and other suppliers.
However, what is being offered in the larders is being changed to meet the budgets available and rising cost of foods.” 
5. Next steps
and
timescales
External consultants have recently completed a review of the larder models, which vary depending on the local aims of the community
organisation.  This has been taken to the NA Fairer Food Network for discussion and coproduction of a sustainable model which is now
being implemented. 
Balance of Tackling Financial Insecurity £61,499.
Officers continue to work on support for community groups to assist with warm banks, food, and energy advice for winter 2022-23. 
6. Comments The models have to align with the aspirations of community volunteers and the available budget. There is considerable potential for the
larder volunteers to offer advice and refer to other partners, such as Home Energy Scotland (7 of the 14 larders have already completed
their referral training and can now signpost via Home Energy Scotland’s online portal) 
199

Page 200

8 
Tenant Grant Fund
1. Description of
funding stream,
date and
amount 
The Scottish Government provided an allocation of £10m to Scottish local authorities during financial year 2021/22 to provide direct
financial support to tenants - via landlords in their area - for the specific purpose of paying rent arrears arising from the impact of the
COVID-19 pandemic.  It was aimed at highly vulnerable tenants who would become homeless or did not have alternative sources of
support.  Coronavirus (COVID-19) Tenant Grant Fund: North Ayrshire Council received an allocation of £298k.
2. Intended impact The grant is to help prevent homelessness and sustain tenancies by directly reducing, alleviating, or paying off rent arrears altogether,
where a tenant is in either the social or private sector, and has faced difficulties due to Coronavirus.  The grant covered arrears arising
between 23 March 2020 and 9 August 2021. 
3. Progress to
date against
milestones,
including
expenditure 
The full allocation of funding has been spent; it was closed to new applications on 31 March 2022. 
Total expenditure was £298,259.65, split across 2021/22 and 2022/23.
4. What difference
has the
investment
made? 
555 applications were received, of which 460 were awarded grant.  Of the remaining 95 applications, 75 were closed, 18 were assessed
as not eligible and 2 were refused by the relevant landlord. 
Applications Approved No of applications Amount paid
Private let 29 £18,665.39
RSL 92 £54,978.63
NAC 341 £224,615.63 
5. Next steps and
timescales 
N/A
6. Comments Initial spend within the Fund was low despite a high level of applications being received.  Although applications were being made these
couldn’t be progressed due to a number of factors, including the requirement for proofs and non-engagement from either the tenant or
landlord.  In January 2022 officers reviewed processes and engaged with landlords to expedite applications into decision making and
awards being made.  The process was very labour intensive, and staff had to make several contacts with both tenants and landlords
despite best attempts to ensure the information required was fully captured within the application process. 
The fund is now closed with allocated monies being fully spent.
Finance and Benefits
200

Page 201

9 
Housing Tenant Hardship Fund
1.  Description of
funding
stream, date
and amount 
The Scottish Government provided an allocation of £867,000 to North Ayrshire through the Scottish Government Winter Support Fund –
Tackling Financial Insecurities.  The supporting guidance detailed flexibility of use across a number of areas to target those most in need
e.g., food support, fuel, isolation, welfare fund top ups, housing, homelessness.   
From this fund the Council’s Housing Service was awarded £195K for help with tenancy hardship, focusing on highly vulnerable tenants
affected by fuel poverty.   
2.  Strategic
intent:
intended
impact
The funding assists any North Ayrshire Council tenant who is finding it difficult to manage fuel bills.  The Support Worker provides person-
centred housing related support including income maximisation, welfare benefit advice and assistance, fuel, and utilities advice, helping
them to sustain their tenancy and prevent any potential homelessness issue in the future.
The fund helps support winter warm initiatives and interventions for our most vulnerable tenant who are at the greatest risk of fuel poverty. 
3.  Progress to
date against
milestones,
including
expenditure
Funding was carried over into 2022/23 due to the timing of allocation.  
• 4 temporary posts funded until April 2023, at a cost of £142K: 4 Housing Support Workers posts were created at the end of 2021/22
(2 x Fuel Poverty and 2 x Sheltered Wellbeing).  The funding was carried over into 2022/23 due to the time taken to recruit into the
posts.
• Top up of meters to help resettlement from temporary accommodation into mainstream tenancies.  We have set aside £15K and are
currently setting processes up with the Scottish Welfare Fund.
• Assist to top up gas meters where they require to be uncapped in order to re-start a gas supply and allow for a gas safety check to
be completed.  To date we have only spent £210 as we have managed to gain access to other funds via energy suppliers/agencies,
but expectations is that due to funding from these sources being limited we will achieve full expenditure of £10K by 31 March 2023.
• Winter warmth initiatives/interventions - officers are researching what could impact most effectively on making heating and overall
energy cheaper in relation to the cost-of-living crisis.  We currently anticipate expenditure of £28K by 31 March 2023. 
4.   What
difference
has the
investment
made? 
Update to 31 January 2023 we have supported 197 tenants with an average age of 39 to tackle fuel poverty.  7 of these tenants had
previously been known to Homeless Services.  Our engagement rate YTD is 53%.  
We continue to carry out regular visits to each of the 28 sheltered units and have engaged with 641 residents/tenants to date.
5.  Next steps
and
timescales
Fuel Poverty/Sheltered Wellbeing Housing Support Workers 
Continue to engage with tenants/residents to tackle fuel poverty and maximise income where possible to avert crisis with energy over the
winter months – by 31 March 2023. 
Winter Warmth Initiatives/Interventions 
Provide our most vulnerable tenants with access to a range of goods that reduce energy costs over the winter months – by 31 March 2023. 
201

Page 202

10 
Sustainability Team 
• Linking in on any of the Sustainability team’s projects that could support tenants. 
• Discussions around the new ‘Energy Smart’:  Energy Based Community Support Model - by 31 December 2022. (completed). 
Promote the service when engaging with tenants – 31 March 2023. 
Social Welfare Fund 
Ongoing discussions with Social Welfare Fund (SWF) Manager about how we can assist with payments for meters for new tenancies (NAC
only, as Registered Social Landlords (RSLs) do this as part of new tenancy set up) and people struggling to meet the cost of energy prices
as they start to rise – by 31 October 2022 (completed).  This is being done via Housing Support staff due to complexes around how this
would work in-line with the Scottish Welfare Fund and the impact this could have on staffing resources.  This method of working will remain
in place until 31 March 2023 
Social Media/Referrals 
Continue to engage with residents in North Ayrshire via social media and a referral process that will be managed via the Housing Support
Service Co-ordinator - by 31 March 2023. 
Cost-of-living Crisis  
Working with other Council departments/agencies to address Cost-of-living crisis being faced by people at risk of homelessness and also
tenants.  Signposting to other agencies and collecting data on resources available within communities for support through the winter months
– by 31 March 2023. 
6. Comments As funding was not made available until around February 2022, recruitment timescales meant staff were unable to take these posts up until
May 2022.  Within a short space of time the team have achieved great success in engaging with tenants who are in fuel poverty (53%).  The
team have also successfully engaged with tenants and helped to arrange gas safety checks, with gas restored to 370 properties.  This
intervention potentially avoided 370 forced entries into these properties and avoided a cost of approx. £59k to the Council. 
202

Page 203

11 
Scottish Welfare Fund (SWF)
1. Description of
funding stream,
date and
amount 
Total £1,153,000 recurring funding from Scottish Government.  Additional top up of £88,070 received Feb 23 and underspend of
£157,477 carried over from last year added to the recurring funding to give a total figure of £1,398,547.00.
• £272,357 allocated to Crisis Grants
• £1,126,190 allocated to Community Care Grants
2. Intended impact The aim of the funding is to provide financial help by way of a Crisis Grant to those in immediate crisis or a Community Care Grant to
those in need of essential household items.  The funding is intended to provide a Crisis Grant of a cash award to people who are in
financial crisis because of either a disaster like a fire or flood or are in an emergency situation such as having lost all their money, had
their money stolen, or are in need of food.  It is also used to provide energy vouchers for their home.  The award is made using a text
message or email to their phone with a code which can be redeemed at any Pay Point vendor ensuring they can access the cash or
energy top up for their pre-payment meter quickly.
Community Care grants aim to help people who are leaving any form of care such as hospital or prison or who have been homeless and
require help to set up their own home by providing them with essential household items and furniture.  It can also be used to help
households facing exceptional pressure with on-off items such as a washing machine or cooker. 
3. Progress to
date against
milestones,
including
expenditure 
Crisis Grants - £232,016
Community Care Grants - £1,011,541
Total spend - £ 1,243,557 
4. What difference
has the
investment
made? 
This financial year to date, the Scottish Welfare Fund has helped  3,237 people in financial crisis with a Crisis Grant.  1,445people have
received fuel vouchers, and 781 people have received a Community Care grant to help with essential household items and furniture. 
5. Next steps and
timescales 
Continue to accept and process applications as quickly as possible throughout the year. 
6. Comments The SWF is delivered using a “One Team” approach ensuring that when someone calls to apply for a Crisis Grant that a decision to
award is made whilst the customer is on the phone and the payment can be made quickly to enable them access to much needed cash or
fuel vouchers. 
203

Page 204

12 
Council Tax Reduction Scheme (CTR)
1. Description
of funding
stream, date
and amount 
£12,930,000 recurring funding by North Ayrshire Council. 
2. Intended
impact
To help those on lower incomes by lowering the amount of Council Tax that they are liable to pay.  This is based on age, household
structure and income and is charged on a per dwelling basis rather than to individuals.
To fund CTR awards to all eligible households on a low income across North Ayrshire. 
3. Progress to
date against
milestones,
including
expenditure 
Year to date £12,962,094 has been awarded in total. 
4. What
difference
has the
investment
made? 
CTR has enabled Council Tax bills to be more affordable for lower income families.  Current caseload is 16,328. 
5. Next steps
and
timescales 
Continue to ensure that there is high uptake of CTR and that it is awarded quickly for those eligible.
6. Concluding
comments
Automation of CTR has been introduced to ensure that any notifications received from The Department for Work and Pensions (DWP)
confirming eligibility or changes are automatically applied to the relevant Council Tax account. 
204

Page 205

13 
Housing Benefit (HB)
1. Description of
funding
stream, date
and amount 
£34,400,000 recurring funding from DWP. 
2. Intended
impact
To help people who are on unemployed, on a low income or claiming benefits towards paying their rent costs.
Housing Benefit is aimed at pensioners and people of working age who are unemployed, on a low income or claiming benefits and have
not yet been moved across to Universal Credit to help them towards paying their rent costs. 
3. Progress to
date against
milestones,
including
expenditure 
Year to date £32,297,924 has been awarded in total.
4. What
difference has
the investment
made? 
This has helped people to afford to keep their tenancy and helped prevent them from falling into arrears with their rent. 
Current caseload is 7,553
5. Next steps
and
timescales 
Continue to ensure that Housing Benefit claims and changes of circumstances are processed quickly and accurately.
6. Comments  N/A 
205

Page 206

14 
Discretionary Housing Payment (DHP)
1. Description of
funding
stream, date
and amount 
£2,498,947 recurring funding agreed by North Ayrshire Council. 
2. Intended
impact 
The aim is to provide financial help to people claiming Housing Benefit or who receive housing cost payments through Universal Credit
but their benefit is less than the full amount of their rent.  DHP is used to help cover the shortfall.  
3. Progress to
date against
milestones,
including
expenditure 
Year to date £2,401,108has been awarded in total.
4. What
difference has
the investment
made? 
This has helped people to afford to keep their tenancy and helped prevent them from falling into arrears with their rent. Current caseload
is 4,683 
5. Next steps and
timescales 
Continue to ensure that DHP claims are processed fairly and quickly within the budget.
6. Concluding
comments 
DHP requests are managed annually within the budget. 
206

Page 207

15 
Financial Inclusion
1. Description
of funding
stream, date
and amount 
Recovery and Renewal Investment Fund 
Financial Inclusion: Progressive Finance Access to Finance (1st Alliance): £0.150m  
2. Intended
impact
North Ayrshire Council approved funding for the 1st Alliance Credit Union to deliver a progressive finance scheme, to lend to individuals,
who are considered as a higher credit risk due to history, but who can however afford repayments.    
Small loans would be available to low-income residents who would not normally qualify through typical lending rules i.e., due to the
higher risk factor, the credit union would not be able to lend from members’ funds.  The agreed period for this investment is 1st October
2021 to 1st October 2023 (or whenever the capital investment is exhausted if prior to this date) and the total grant funding will be paid in
three instalments.  North Ayrshire residents who borrow from 1st Alliance must save a minimum of £3/week to access a loan (this saving
and borrowing model is standard for Credit Unions), therefore borrowers will at the same time become savers.  In the longer term this
will provide a safety net for both planned and unplanned expenses and reduce the need to borrow from other sources, including high-
cost lenders, or to fall into debt, including arrears with bills.  The fund is recycled as each loan is cleared off and the member moves
onto a members based loan.  This will therefore provide a legacy fund which will enable 1st Alliance to continue providing low-cost loans
to “high risk” customers in the future. 
3. Progress to
date against
milestones,
including
expenditure
To the end of January 2023, 165 individuals accessed loans through this investment, the total value of loans to date is £123,135 and the
loans agreed range from £250-£2000 with the majority agreed at £500.
63 loans were agreed from August to December 2021. 
36 from January to June 2022.
29 from July to September 2022
32 from October to December 2022
5 in January 2023.
Borrowers are from across North Ayrshire with the majority being from Irvine, Kilwinning or the Three Towns.  Ten were from Garnock
Valley, 3 from the North Coast and 3 from Arran. 
A total of 75 loan requests were declined mostly due to lack of affordability or defaults on credit files. 
19 loans are currently in arrears, a total of £5,492.87, which represents 4.5% of total loans. 
A standard assumption of 5% bad debt provision had been assumed.  This higher rate of bad debt applies to all 1st Alliance loan
portfolios and they believe it to be linked to a number of factors including the increase in cost-of-living. 
£150,000 has been paid to 1st Alliance to support the delivery of the Progressive Finance Initiative.   The full allocation of £0.150m has
now been paid to 1st Alliance Credit Union for the purposes of the Progressive Finance Initiative.
4. What
difference
has the
Borrowing through 1st Alliance costs less on interest rates than most other lenders.  For example:
1st Alliance: £400 loan = 10 per week for 11 months = £72 interest.
Scotcash:   £400 loan = £12.21 per week for 12 months= £234.78 interest & £24 fee.
207

Page 208

16 
investment
made? 
This investment has therefore provided access to low-cost affordable loans for residents who would otherwise either have gone to
higher cost lenders or have fallen into debt due to not being able to access a loan from anywhere.
55 loans were to buy out high-cost debts which have higher interest rates. 
The other loans were for a range of purposes including purchase of household items, clothes, events, holidays and for Christmas, which
accounts largely for the higher number of loans agreed 
158 borrowers are regularly saving.  A total of £23,532 has been saved over the first 12 months, an average of £142 per saver, with
some saving 
76 borrowers have now accessed top-up loans which means that the interest rate is reduced, as they have evidenced that they are
responsible borrowers. 
When setting the 23/24 Budget, Council last week approved a further £100,000 to be invested in Financial inclusion support, mainly
debt advice services.
5.  Next steps and
timescales 
Progress will continue to be monitored. The final payment of £50,000 has been transferred and discussions will take place to ensure this
progressive finance model is embedded within the new Financial Inclusion Strategy and service for North Ayrshire
6. Comments The investment is proving to be beneficial to North Ayrshire residents who may otherwise have been unable to access low-cost
affordable loans, meaning that they have been able to cover additional unexpected and expected costs, purchase essential household
items, and reduce higher costs loan payments.  Many have improved credit ratings and/or moved on to top up loans with a lower
interest rate and most have built up some savings, many of whom may not have managed to save before. 
1st Alliance is now building that ‘legacy fund’ which will benefit residents beyond the scope of this investment period. 
208

Page 209

17 
Financial Inclusion Capacity Building
1. Description of
funding stream,
date and amount 
£258k for Financial Inclusion, agreed at August 2022 Cabinet.
£100k agreed at Council budget on 1/3/23. 
2. Intended impact The funding allocation was made to support the increasing demand for financial inclusion supports which is currently being
experienced through the Money Matters and Welfare Reform Advice Teams. 
Plans to utilise available non-recurring funding:
• Commissioning of an independent debt advice service for North Ayrshire for 2 years to address an identified gap in debt advice
provision. 
• Extension of the Better Off pilot as required to ensure smooth transition and continuity of service – currently agreed until end
June 2023 
• Development of case management system and IT infrastructure  
• Salary plus costs for the Senior Manager post for 24 months 
• Marketing materials associated with a Communications Plan 
This will address the increasing demand for both welfare rights and debt advice across North Ayrshire.  
3. Progress to date
against
milestones,
including
expenditure
The review of financial inclusion services across the Council has now been concluded and it has been agreed that the Money Matters
Team (Health & Social Care Partnership) and Welfare Reform Advice Team (Housing) will come together under a single lead for
Financial Inclusion.  The new team aims to build on the work of the existing services and create additional capacity to support local
citizens through reducing cross-referrals and streamlining referral pathways. 
The additional funding will provide additional staffing capacity to support local people.  As the project to review financial inclusion
services has just concluded, no expenditure has yet taken place, and decisions around the use of the funding will now be made in the
context of the new team.  A particular need for ongoing debt advice has been identified through the project and this will be explored. 
At its budget on 1/3/23 the Council allocated up to a further £0.100m to build on the previous investment of £0.258m to implement the
review of financial inclusion services across the Council and to secure a level of support which is more commensurate with current
need. 
A five-year Financial Inclusion Strategy for North Ayrshire has been finalised and was approved by Cabinet on 21 March 2023.
The merger of the Money Matters (HSCP) and Welfare Reform and Advice (Housing) teams will start on 1 April 2023 when the Team
Managers will start reporting to the new Senior Manager (Financial Inclusion) 
4. What difference
has the
Future report.
209

Page 210

18 
investment
made? 
5. Next steps and
timescales
See 3 above.   
6.  Comments N/A 
Parental Employment Support Fund (PESF)
1. Description of
funding stream,
date and amount 
Parental Employment Support Fund (PESF): support for unemployed and employed parents within the key priority groups:
• Parents who are <25 years of age
• Parents with a child under 1 year old
• Parents with 3 or more children
• Parents who have a disability or disabled children
• Ethnic minority parents
• Single parents 
1st April 2022 – 31st March 2023 £282,132
2. Intended impact The expected outcomes and objectives for PESF are as set out below:
• Person-centred support for parents to address barriers to work including skills development, work experience, health support,
money advice, motivational support 
• Support for parents already in work through the provision of training and employability support to sustain employment and
progress within the workplace by gaining improved employment
• Maximise opportunities to reduce child poverty by enhancing income through employment 
3. Progress to date
against
milestones,
including
expenditure
This funding supports the continuation of We Work for Families, contracted for delivery by The Lennox Partnerships, with keyworkers
delivering tailored employability support to families across North Ayrshire.   
During 2022/23 167 new parents were registered for support and 67 progressed into employment. 
Referrals are received from health visitors and funding through PESF has also supported a pilot programme with a focus parents
accessing 1140 hours of childcare, the pilot has focussed on supporting parents and working with Hayocks Primary, Hayocks Early
Years, Springvale Early Years and Auchenharvie Academy - 4 new Keyworkers have been recruited for the pilot with 12 registrations
completed. 
Other highlights include: Step into Business Admin Pilot – 11 Parents commenced a pre–employment programme for 5 weeks (3 days
per week) at Ayrshire College, completing the PC Passport qualification before progressing to a 26 week paid work experience
210

Page 211

19 
placement with an anchor organisation, where they will work towards achieving an SVQ level II in Business Administration by
demonstrating competence in the workplace.  This builds on the Skills for Life Programme delivered across various council services. 
Hillhouse / WWFF Christmas appeal  - WWFF delivered gifts to 63 families/114 children at a challenging time for families struggling
with the cost  of living.  Quotes have been provided by all in receipt and all highlight the worth of this support. 
Fuel Poverty Blanket Appeal – WWFF sourced £900 funding to purchase 150 blankets to give to children and families experiencing
fuel poverty, 120 blankets were issued to Hayocks Early Years and Primary School and the additional blankets will support parents
and children in the wider community. 
Public Transport Scheme – 99 parents received a travel pass to access 3 months free public transport which supported enhanced
engagement with employability services as well as increased wellbeing and family leisure time. 
4. What difference
has the
investment
made? 
The investment has improved engagement, delivered a pilot to develop new referral pathways which will increase volumes of parents
supported in the future and supported unemployed parents to progress into employment.
5. Next steps and
timescales
Child poverty investment as part of Best Start Bright Futures is anticipated from the Scottish Government to support parental
employment from 1st April 2023 – 31st March 2024, the allocation and Grant Offer Letter with the terms and conditions of this funding is
expected once ministerial approval and Cosla approval can be obtained.
6.  Comments Income from employment is a key driver to take children out of poverty and there is an established model which can be scaled to
deliver the impact required when funding is confirmed. 
211

Page 212

20 
Free School Meals
1. Description of
funding stream,
date and amount.
1) Scottish Government revenue funding for 2022/23 (£712k).
2) Scottish Government revenue funding for 2022/23 (900k).
3) Scottish Government revenue funding for 2023/24 (£2.272m) 
2. Intended impact The funding supports the continued roll out of Universal Free School Meals (UFSMs).  This funding is the revenue funding to cover
costs for Primary 4 & Primary 5 children in the financial year 2022/23.  The Scottish Government also provides funding to enable a
continued provision of food-based support during the school holiday periods to those children with an assessed eligibility for free
school meals. 
3. Progress to date
against
milestones,
including
expenditure 
• The holiday programme ran over the Easter & summer breaks with support from community partners.  Vouchers were also issued
during the summer, autumn, and winter and February breaks.
• Roll out of Universal Free School Meals (UFSMs) to Primary 4 & Primary 5 children is complete.  We continue to monitor and
encourage uptake of meals to ensure we maximise the benefits of this entitlement. 
• The Scottish Government have provided revenue funding of £570,000 in 2023/24 to start the roll out of free school meals to all P6
and P7 pupils whose families are in receipt of the Scottish Child Payment. They also committed to continuing funding to support
free holiday meals during 2023/24. 
4. What difference
has the
investment
made? (Stats and
qualitative
information)
Easter meals provided – 4,622
Summer meals provided – 16,213
Vouchers issued for circa 5,000 children
Uptake of school meals has increased for primary 4 & primary 5 children following the UFSM provision roll out however, overall uptake
for UFSMs is lower than anticipated.  This is the general trend across other authorities. 
Quarter 3 figures 2022/23
P1-P5 UFSMs – 80.4%.  
P6 & 7 assessed need FSM uptake – 57.1%. 
5. Next steps and
timescales
Planning has been undertaken in Facilities Management (FM) to facilitate a further roll out of UFSMs when it is announced by the
Scottish Government as well as the planned expansion of eligibility for free school meals to those in receipt of the Scottish child
payment.
Cabinet approved future provision of free school meals on 21st March 2023.
Children and Families 
212

Page 213

21 
Bridging Payment
Direct payments will be made for future holiday periods which are aligned to the cost of a school meal. Cash payments allow more
flexibility on the use of the funding and a more dignified provision for eligible families.
6. Concluding
comments
Holiday meal provision (food or vouchers) ensures continuity of food for all children assessed as eligible for FSMs.  This supports
access to food and removes a financial burden from families. 
The expansion of UFSMs continues to support all families in this difficult economic climate.  Many families who are not eligible for
assessed-need FSM, are also struggling with the cost-of-living increases therefore free provision of a hot meal will ease the financial
burden of having to pay or provide an alternative lunch option. 
Child Bridging Payment
1. Description of
funding stream,
date and amount. 
The scheduled summer Child Bridging Payment of £130 was increased to £230 (additional £100 payment by North Ayrshire Council)
and eligibility for the £100 payment was extended to low-income families of children of pre-school age.
(Funding source: North Ayrshire COVID Economic Recovery Fund SG Funding): £0.570m June 2022.
The scheduled autumn and winter Child Bridging Payment of £130 was increased to £230 (additional £100 payment) and eligibility for
the £100 payment was extended to low-income families of children of pre-school age.
Funding source: The Council’s uncommitted Investment funds and earmarked funds following approval from the 2022/23 Budget
process: £1.140m August 2022. 
2. Intended impact The Scottish Government provides Child Bridging Payment funding to local authorities for each child in receipt of Free School Meals
on the basis of low income.  These payments are provided for all eligible children and young people of school age.  The payments total
£520 per annum and they are currently paid in spring, summer, autumn, and winter at £130 for each eligible child.  The funding from
Scottish Government has been increased to £260.  The funding was increased to help address the current cost-of-living pressures and
to also recognise the needs of families of children at pre-school age.  It is estimated that the £100 payments directly to families benefit
around 5,700 children (over 3,300 families) with payments made from late June 2022. 
3. Progress to date
against
milestones,
including
expenditure 
Summer, autumn and winter payments have been made.  The expenditure was completed in December 2022.
4. What difference
has the
investment
made? 
Feedback indicates that the timing and value of the payments has made a real difference to families, especially as school holidays and
colder weather impact on household bills.
213

Page 214

22 
Cost of the School Day and Early Intervention Fund – Child Poverty and Cost of Living
1. Description of
funding stream,
date and
amount. 
Cost of the School Day 
Fund – Council budget 04/03/2021 and Cost of the School Day Cabinet Report 23/03/2021 
Date allocated - 2021/22 budget 
Amount - £0.500m pa (recurring) 
At the Council budget of 1/3/23, this fund was replaced by the Early Intervention Fund – Child Poverty and Cost of Living – one off
investment over 3 years. The allocation of this fund will take into account existing commitments and will be directed by the Child
Poverty and Cost of Living Board) and will be the subject of future reports. 
2. Intended impact The aim of the Cost of the School Day (COSD) is to drive forward a whole systems approach to reducing the cost of the school day in
order to deliver a fairer and more equal North Ayrshire.  It delivers the NA Children’s Services Plan 2020-23 vision which is “for all our
children and young people to have the best start in life and for North Ayrshire to be the best place in Scotland to grow up”.
3. Progress to
date against
milestones,
including
expenditure
There are three key elements:
1000 new digital devices each session for those in greatest need
£100k for school uniform, winter clothing, outdoor learning, sports – participatory approach with schools
£150k for food in partnership with community organisations.
Expenditure
2021/22 –£500k
2022/23 - £500k committed. 
4. What difference
has the
investment
made? (Stats
and qualitative
information)
Cost of the school day funding has provided schools with enhanced flexibility to meet the needs of learners and their families
throughout the ongoing cost of living crisis. Schools have utilised this funding in a variety of ways, which have been designed to meet
needs within their local context. While it is challenging to quantify the difference made, qualitative evidence is gathered at school level.
Loudon-Montgomery Primary School, as a school located in one of North Ayrshire’s areas of highest deprivation, provides a good
example of the difference this funding has made. The school has used this funding to put in place a breakfast club and morning snack;
opportunities for families to access free school uniform; and participate in home learning through provision of IT devices and other
learning materials that promote family learning. Another key use of this funding has been enabling all pupils to participate in school
trips and other extra-curricular activities. Loudoun-Montgomery’s Head Teacher believes: “our child centred focus on reducing the cost
of the school day enhances our ability to broaden our learners’ experiences, deliver a wider curriculum and extend learning beyond the
5. Next steps and
timescales
The recent increase in the Scottish Child Payment has been implemented and therefore the purpose of the bridging payment has
ended.
6. Concluding
comments
The payments have bridged the period of the roll out of the Scottish Child Payment and the local additional top-up was welcomed by
families.
214

Page 215

23 
school day.  Our focus on ensuring that pupils look and feel their best and the provision of a healthy breakfast, snack and lunch all play
a significant part in setting up our children to embrace the learning ahead of them each day.”
5. Next steps and
timescales
Due to a small amount of carried forward cost of the school day funding from 2021-22, as well as additional community funding made
available this year, head teachers have been allocated £198k in the 2022-23 school year. Plans are progressing at school level to
spend this funding in the remainder of the school year in areas where this can make the biggest difference to support learners and
their families. This includes bulk purchasing of school uniforms.
6. Comments The funding has been welcomed by schools as an enabler in reducing the poverty-related attainment gap. 
Investment Fund
1. Description of
funding stream,
date and amount. 
Children and Families Investment Fund
Fund: Recovery and Renewal Investment Fund - £0.075m
Digital Access Fund
Fund - Recovery and Renewal Investment Fund - £0.255m
Support for the North Ayrshire Child Poverty Strategy and Action Plan 
Fund: North Ayrshire COVID Economic Recovery Fund - SG Funding - £0.076m
Date Allocated – 15/06/21   
2. Background:
rationale for the
funding
allocation
A Cabinet Report on 15/6/21 set out the rationale, including:
• Prioritise the health and wellbeing of our residents by protecting the most vulnerable in our society against the immediate threat of
coronavirus and the consequences of changes to the way we live.
• Work with our communities in the renewal of services to ensure they meet their needs and priorities. 
• Build community capacity and resilience.
• Ensure our children and young people get the best start in life by creating opportunities for education and employment, including
through Community Wealth Building and Renewal.  Prioritise and help tackle poverty, including child poverty. 
3. Intended impact The aim of the funding was to promote recovery and support the most vulnerable children and families.  Funding also supported the
further reduction in the Cost of the School Day, to contribute towards Scottish Government’s aim of eradicating digital exclusion by
improving digital access and skills, and the ongoing work to reduce Child Poverty and mitigate against its impact. 
4. Progress to date
against
milestones,
including
expenditure
Digital Participation Officer in post 
Review of access to wifi and IT resources in community venues complete (18 centres plus 15 libraries )  and action plan to developed
– currently implementing the actions 
Wifi access map created – available on NAC library app and NAC web page.
Supporting the development of Digital Volunteers and Volunteering opportunities.  
Established North Ayrshire Digital Access Forum with agreed Terms of Reference in place. 
Events and sessions delivered across North Ayrshire with specific focus in school communities. Strong partnerships are being
developed with Family Learning Teams and school staff.
215

Page 216

24 
Supporting Ukranian Hub with essential access to IT resources. 
In partnership with the Digital Officer in TACT, created short films to assist in promoting the support available online and tutorials on
how to access help and complete forms etc.  
Digital Participation Officer sits on the Digital Strategy and Accessing our Council Workstreams   
5. What difference
has the
investment
made? 
Available community-based resources are known and gaps identified. 
Positive feedback from participants attending sessions.
Action plan being implemented: future report. 
6. Next steps and
timescales
The following current actions are:
• Establish and potentially widen the Forum membership.
• Link with Education on supply of the digital devices and deliver support to assist with the use of the resources. 
• Work with feedback from Chit Chats to deliver bespoke help based on community feedback.  
• Integrate with Community Learning and Development Strategic Plan and support where relevant. 
• Support community associations with IT / internet related safeguarding. 
7. Comments  Future reporting will include impact data as the work progresses. 
216

Page 217

25 
School Clothing Grants
1. Description of
funding stream,
date and amount 
£816,500 recurring funding agreed by NAC.  Additional funding is provided from the council to match demand. 
2. Intended impact The aim of the funding is to provide financial help with children’s school clothing and shoes.  An annual payment of £120 is given to
primary school children and £150 to secondary school children before the start of the new school year then to new applicants
throughout the year.  The intended impact is that all school children have adequate school clothes and shoes. 
3. Progress to date
against
milestones,
including
expenditure 
Total children – 6,499 from 4,045 families
Total spend - £861,090
3,792 Primary children – spend £455,040
2,707 Secondary children – spend £406,050
4. What difference
has the
investment
made? 
Provided financial support to 4,045 families and a total of 6,499children to enable them to afford school clothes and shoes. 
5. Next steps and
timescales 
Continue to accept and process applications as quickly as possible throughout the year. 
6. Comments A promotional campaign takes place each year at the start of school summer holiday period to confirm that applications are open. 
Text messages and emails are sent out to previous recipients with a link to the online application form and encouraging people to
apply.  This is also promoted via the Council’s Twitter and Facebook pages. 
217

Page 218

26 
Education Maintenance Allowance (EMA)
1. Description of
funding stream,
date and
amount. 
£580,000 recurring funding agreed by North Ayrshire Council.   
2. Intended impact To provide financial support to young people from low-income families to allow them to be able to afford to stay in post-16 education
either in school or college who might otherwise have left education.  The aim of the funding is to provide financial support of £30 a
week (paid fortnightly in arrears) to 16 to19 year-olds in education who come from low income families subject to attendance and
agreement of a learning plan. 
3. Progress to
date against
milestones,
including
expenditure 
Total expenditure this financial year to date is £482,460.
667 young people have received at least one payment for this school year.
4. What difference
has the
investment
made? 
As payments are made directly into the young person’s bank account, this ensures that they can access the funds easily and use them
for whatever they need to help them maintain attendance in school. 
5. Next steps and
timescales 
Continue to accept and process applications as quickly as possible throughout the year. 
6. Concluding
comments
A promotional campaign takes place each year after the start of the school year in August to confirm that applications are open and
encourage uptake.  This is also promoted via the Council’s Twitter and Facebook pages. 
218

Page 219

27 
Contribution to Mental Health and Wellbeing
1. Description of
funding stream,
date and amount. 
Contribution to Community Mental Health and Wellbeing 
Fund - Tackling Financial Insecurity Winter Funding 2021/22: £0.307m
Date Allocated - 29/11/21
Fund – Children and Young People’s Community MHWB Supports and Services Framework Grant Funding (CYP CMHWB) 2021 -
2022 £370,000, 2022-23 £360,000 (total funding allocations) a portion of which contributes to this theme.
Community Support for Mental Health 
Fund - Recovery and Renewal Investment Fund: £0.075m
Date Allocated – 15/06/21
Fund – Children and Young People’s Community MHWB Supports and Services Framework Grant Funding (CYP CMHWB) 2021 -
2022 £370,000, 2022-23 £360,000 (total funding allocations) a portion of which contributes to this theme. 
Costs for Island Self-Isolation
Fund – Tackling Financial Insecurity Fund  
Date Allocated 29/11/21 
2. Intended impact Empowering local communities to deliver a wide range of events, activities and interventions that support positive mental health and
wellbeing across North Ayrshire. 
Enabling children, young people and families to access MHWB support at the time of need, within their local communities and to
contribute to promoting positive mental health and wellbeing and address emotional distress. The support should be provided by an
appropriately trained workforce. 
3. Progress to date
against
milestones,
including
expenditure
Contribution to Community Mental Health and Wellbeing 
Scottish Government gave Arran Community & Voluntary Service (CVS) responsibility for the distribution of the National Community
Mental Health and Wellbeing Fund.(CVS) developed a robust application and assessment process involving staff from across the
Community Planning Partnership (CPP) and individuals with lived experience. 
The fund was heavily oversubscribed and the £307k was allocated in partnership with Arran CVS to allow more applications to be
funded. 
In financial year 2021-22 the CYP CMHWB contributed an additional £55,000 to the adult CMHWB Fund detailed above to deliver
projects which targeted support for children, young people and families. In financial year 2022-23 a further £30,000 was allocated. 
Of note the employment of a Welfare Rights Officer (£40,000) to work across the 9 secondary schools engaging in outreach support
has resulted in around £350,000 additional income in families’ pockets. The impact of reducing financial insecurity on mental health
and wellbeing is well documented.
Community Support for Mental Health
Health and Wellbeing
219

Page 220

28 
As above.
Costs for Island Self-Isolation
During lockdown periods, protocols were developed for dealing with visitors to the island who tested positive whilst on Arran and were
in need of assistance to self-isolate or travel home. 
4. What difference
has the
investment
made? 
Contribution to Community Mental Health and Wellbeing 
The £307k formed part of a combined budget of £813,346k was allocated to a total of 55 groups over 61 projects.
The investment from CYP CMHWB has allowed 4740 children and young people and 742 family members to access early intervention
programmes in their community for positive mental health and wellbeing or emotional distress.
Community Support for Mental Health
The £75k formed part of a combined budget of £813,346k was allocated to a total of 55 groups over 61 projects.
Costs for Island Self-Isolation
The availability of the fund allowed a robust and practical protocol to be in place if needed. 
5. Next steps and
timescales
Contribution to Community Mental Health and Wellbeing 
As we approach the one-year milestone since allocations were made Arran CVS are carrying out the evaluations of the projects.  The
next round of the Community Mental Health and Wellbeing Fund has just launched and again CPP partners are involved in the
process to maximise impact and share local knowledge and experience. 
Evaluations of the impact of the CYP CMHWB funding are ongoing- with the Scottish Government receiving 6 monthly reports on
impact.
Community Support for Mental Health
Funding fully utilised as above, non-recurring. 
CYP CMHWB receives annual funding. The steering group have, following positive evaluations, agreed to continue to continue to fund
a number of projects across the authority for financial year 2023-24. 
6. Comments Contribution to Community Mental Health and Wellbeing 
Using the established process made the spend quick and effective with money getting to the local groups quickly and via a single
application process.  It allowed the available money to be combined for maximum impact. 
Community Support for Mental Health
As above.
Further planning for the CYP CMHWB Grant funding for next financial year is underway and an analysis of both referral reasons and
onward referrals will allow us to target funding, however we are also keen to continue to deliver messages around positive mental
wellbeing and how to keep well. It is pleasing to note onward referrals to CAMHS remain low and we hope this indicates the positive
impact the CYP CMHWB supports, and services provide. We are however aware that locally CAMHS referrals are in fact increasing
and are hoping to work with CAMHS colleagues to identify themes and localities and help us develop and target interventions. 
Costs for Island Self-Isolation
The fund allowed North Ayrshire Council to proactively contribute to the CPP approach to situation and emergent protocols. 
220

Page 221

29 
Supporting the Resilience of Local Businesses
1. Description of
funding stream,
date and amount 
Although not specifically allocated as part of cost-of-living, funds associated with supporting business have been redirected to focus on
sustainability, capacity building and resilience. 
Key funding that has been redirected: European Regional Development Fund (ERDF) £300k. 
2. Intended impact Agreement with Scottish Government to waive restrictions on European Regional Development Fund from Growth.  This initially was in
response to pandemic however given cost-of-living crisis flexibility remains to support resilience of business base.
Small and Medium-sized Enterprises (SMEs) form the cornerstone of NA economy and given make up recruit locally.  Support to keep
business sustainable and competitive allows for continued employment and helps alleviate potential increases in redundancy/poverty. 
It is also noted that cost-of-living has significantly increased cost impacts for most businesses including utilities, supply chains etc. 
3. Progress to date
against
milestones,
including
expenditure 
Since start of year over 500 businesses have been supported and a further 140 new businesses have received support to start up.
4. What difference
has the
investment
made? 
927 jobs have been safeguarded and a further 39 new jobs have been filled with support from Business Development (BD).
Building capacity and sustainability has focused on new ways of working, cost control, implementation of digital technologies. 
Outputs:
135 businesses have been supported to reduce carbon impact.
140 businesses have been supported to enhance digital capability.
116 instances of specialist consultancy provided to business.
Helped secure over £600,000 from external providers for businesses. 
5. Next steps and
timescales 
Continue with support for business.  ERDF funding will continue to March 23.
6. Comments  N/A 
Business and community including transport to work
221

Page 222

30 
Review and Improve Support for Childminders and Out of School Clubs (OOSC) Providers
1. Description of
funding stream,
date and amount 
Review and improve support for childminders and OOSC providers 
Fund - North Ayrshire COVID Economic Recovery Fund - SG Funding: £0.126m. 
Targeted employability opportunities for key families during Summer 2022 
Fund - North Ayrshire COVID Economic Recovery Fund - SG Funding: £0.050m. 
Date awarded – June 2022 
2. Intended impact Review and improve support for childminders and OOSC providers  
By the end of this parliament Scottish Government has committed to ensure provision of wrap around childcare for families who need
it.  Use of childcare has changed significantly because of COVID-19.  OOSC providers face a particularly unstable business
environment.  Reduced use of OOSC services during lockdown and changed working patterns provide an opportunity to assess future
demand and support the sector to ensure the local availability of services in line with Scottish Government’s expectations.  The specific
needs of the vulnerable children, kinship care and our island communities will also be considered a spart of this work.  
Targeted employability opportunities for key families during Summer 2022 
Parents and carers with school age children will be encouraged to undertake a variety of short courses that upskill or lead to a route
into employment.  Build relationships between the Employability Team and participants, whilst building up confidence in the use of
childcare services. 
3. Progress to date
against
milestones,
including
expenditure
Review and improve support for childminders and OOSC providers  
Initial discussions have been had with relevant officers and a draft Terms of Reference developed for a short life working group to feed
into and guide this work 
Previous work relating to childminding on Arran has been requested via Scottish Childminding Association   
The role profile for the post is with Job Evaluation 
Targeted employability opportunities for key families during Summer 2022 
This work still progressing with a group of 10 parents in the Auchenharvie Cluster. A strong partnership is in place between
Employability, Information and Culture, Ayrshire College and the local childcare providers.  
4. What difference
has the
investment
made? 
Review and improve support for childminders and OOSC providers 
Too early to assess 
Targeted employability opportunities for key families during Summer 2022 
Ongoing – full assessment / evaluation will be carried out with participants and partners at the end of the course   
5. Next steps and
timescales
Review and improve support for childminders and OOSC providers 
Appoint officer into post.
Targeted employability opportunities for key families during Summer 2022 
Finish delivery as planned. 
Carry out full assessment / evaluation with participants and partners.
222

Page 223

31 
6. Concluding
comments
Review and improve support for childminders and OOSC providers 
The fluctuating childcare services across North Ayrshire will benefit from the additional support and the local families will have access
to quality services. 
Targeted employability opportunities for key families during Summer 2022
Partners are keen to support this style of delivery. 
223

Page 224

32 
Public Transport Travel Scheme 
1. Description of
funding stream,
date and amount 
Public Transport Travel Scheme
NAC Economic Covid Recovery Funding
Approved by Cabinet 7 June 2022 and subsequent Audit and Scrutiny Committee on 20 June 2022: £20,000 
2. Intended impact The scheme contributes to the principles of the Recovery Fund and Child Poverty Action Plan.  This scheme provides support low-
income households and individuals returning to work with free access to public transport for a fixed three-month period.   
3. Progress to date
against
milestones,
including
expenditure
The scheme provides three months of free access to bus or rail travel.  Beneficiaries were also supported with a free personalised
travel plan to identify the best travel option for them.  This supports low-income households, access to employment, address transport
poverty and build confidence in public transport post COVID-19.  Due to the nature of the travel cards this also benefitted beneficiaries
for both work and their personal life as they could be used at evenings/weekends.  They could also be used alongside other
concessionary travel schemes including the:
• Young Person’s Free Bus Travel Scheme which allows children and young people under 22 free bus travel;
• Kids for a Quid rail scheme allows children to travel for £1 alongside an adult traveller, for up to four children; and   
• Concessionary travel scheme for disabled people and those over 60 years of age. 
The Active Travel and Transport Team worked with the Council’s Employability team and the Community Enterprise in Scotland
(CEIS) to identify beneficiaries. CEIS is a social enterprise agency who deliver a range of services including employability, employer
engagement, recruitment, and retention services.  This includes workforce development services, community engagement and
capacity building, skills and training services and community regeneration services.
Once beneficiaries were identified, the team prepared a personalised travel plan for each individual to work out the best public
transport ticket solution for them.  Thereafter the individual was provided with the most appropriate ticket for the three- month period.
Pre and post intervention surveys were undertaken with beneficiaries. 
As part of the £1.400m investment to support the work of the Child Poverty and Cost-of-Living Board, it is proposed that £0.100m of
this fund is earmarked for a community transport pilot. The funds will be used to scope and develop a community transport service with
a view to introducing a proof-of-concept pilot during the year. 
4. What difference
has the
investment
made? 
79 individuals will benefit from the £20,000 investment.  This was comprised of 40 Strathclyde Partnership for Transport (SPT)
ZoneCards and 39 Stagecoach bus travel passes.  105 individuals will benefit from the additional SCSP funding.  This was comprised
of 105 Stagecoach bus travel passes.Pre and post intervention surveys were undertaken with beneficiaries to assess the impact of the
scheme.  The information obtained from these is currently being analysed.
5. Next steps and
timescales 
Identification of opportunities to replicate the scheme in 2023/24 are currently being investigated.
224

Page 225

33 
6. Comments The scheme directly benefitted low-income households by reducing the impact of travel costs on household budgets and helping to
address transport poverty.  This improved access to employment opportunities and sustain employment.  It also build confidence in the
public transport network post-pandemic and support sustainable travel for everyday journeys.
The mode of transport was tailored to individual beneficiaries’ needs and both bus and rail travel solutions will be facilitated across
North Ayrshire.  Free travel and transport advice is available to all North Ayrshire residents under the Travel Smart and Trinity Active
Travel Hub activities.  This includes personalised travel plans. 
Community Transport Initiative 
7. Description of
funding stream,
date and amount 
Community transport initiative 
At the Council budget of 1/3/23, the Early Intervention Fund – Child Poverty and Cost of Living, a one off investment of £1.4m over 3
years, included provision of £100k for a exploration of a community transport initiative. 
8. Intended impact The initiative aims to explore the use of Council vehicles to support the needs of communities where access to transport at certain
times of day is a barrier to accessing services and opportunities.
9. Progress to date
against
milestones,
including
expenditure
A report will be brought to Cabinet to explore options
10. What
difference has
the investment
made? 
Future report
11. Next steps
and timescales 
Future report
12. Comments 
225

Page 226

34 
Support for communities
1) Description of
funding stream,
date and amount. 
Additional core hours to support opening of Community centres to accommodate activities associated with isolation and
financial insecurity
Fund: Tackling Financial Insecurities Funding 2021/22: £0.005m.
Date allocated- 29/11/21
Community Books 
Fund: Tackling Financial Insecurity Funding 2021/22: £0.022m.
Date allocated - 29/11/21
Third sector support for programmes to support low-income families and individuals by building on current programmes
Fund: North Ayrshire COVID Economic Recovery Fund – Scottish Government: £0.114m.
Date allocated – 7/6/22 
2) Intended impact Additional core hours to support opening of Community centres to accommodate activities associated with
isolation/financial insecurity
This funding allows local community centres to be open longer in order to accommodate/offer a wider range of activities aimed at
alleviating the effects of social isolation and delivering activities to contribute to positive mental health.
Community Books 
Funding to establish the base/platform on which the local Community Books will be hosted.  This resource will allow staff and
community leaders access to a wide range of information relating to resources available in the local area.  This will in turn assist with
enquiries from citizens seeking help and advice. 
Third sector support for programmes to support low-income families and individuals by building on current programmes
Support for Communities
226

Page 227

35 
Work with the third sector support for programmes to support low-income families and individuals by building on current programmes
such as Out and About, working with families and key groups to improve access to food and environmental opportunities locally,
including through the Fairer Food network and Eglinton Garden Project, to develop skills to grow and cook food and, through family
sessions and activities, build ongoing individual and community capacity.  These sessions will encourage people to engage with the
local environment to support mental health and wellbeing and to develop parenting skills, family bonding, relationships, volunteering,
and employability in a supportive environment. 
3) Progress to date
against
milestones,
including
expenditure
Additional core hours to support opening of Community centres to accommodate activities associated with
isolation/financial insecurity
The funding is fully committed for spend via third sector partners with service level agreements.
Community Books 
Work continues to find the most effective solution however a temporary fix is in place on the CPP web site.
Third sector support for programmes to support low-income families and individuals by building on current programmes
There will be a ‘test and learn’ trial in one locality over a year, which will establish impact and provide data and evidence for future
service design and external funding bids.  The initiative will link to the Love Local voucher scheme which will support local businesses.
A pilot is planned for Ardrossan with the aspiration to widen to the Three Towns in 2023. 
4) What difference
has the
investment
made? 
Additional core hours to support opening of Community centres to accommodate activities associated with
isolation/financial insecurity
Longer opening hours are available in some community centres.
Community Books
6 community books and 6 thematic Cost-of-living Crisis community books are live on the Community Planning Partnership webpages -
http://northayrshire.community/communitysupport/ 
Third sector support for programmes to support low -income families and individuals by building on current programmes
A pilot is being designed. 
5) Next steps and
timescales
Additional core hours to support opening of Community centres to accommodate activities associated with isolation
/financial insecurity
Funding fully allocated – non-recurring. 
Community Books
Staff continue to work with partners and providers to select the most appropriate platform to host the resource.  The aim is to have it in
a pilot form by the end of the calendar year for testing however, a temporary fix is in place on the CPP web site. 
Third sector support for programmes to support low-income families and individuals by building on current programmes
Staff continue to work with partners to develop an inclusive model that fulfils the outcomes.  This will be set for delivery across Three
Towns from Easter 2023 for 12 months with focussed pieces of work during school holidays.   
6) Comments  Support is also provided for communities through the Fairer Food network and community grants, including Community Investment
Fund (CIF). 
227

Page 228

36 
228

Page 229

37 
Islands emergency
1) Description of
funding stream,
date and amount. 
Whilst island communities can access a wide range of existing funding from the Scottish Government, the Island Cost Crisis
Emergency Fund represents an additional £1.4 million investment.
• £1.1 million resource
• £300k capital 
This fund is being directly allocated to Local Authorities, through a 100% population formula as approved by the COSLA Settlement
Distribution Group and COSLA Leaders.  Allocations for are as North Ayrshire Council follows: 
Local Authority  Resource (£000) Capital (£000)
North Ayrshire Council 63 17 
2) Intended impact This has been developed to specifically recognise and tackle the challenges faced by island communities. 
Local Authorities responsible for islands should: 
● Use this funding to target island areas only;
● Use the funding to target immediate need and help those who are struggling due to the cost crisis; and
● Use the funding for existing schemes and/or other new support where they feel the need is greatest. 
3) Progress to date
against
milestones,
including
expenditure
There are already arrangements in place for energy efficiency, energy crisis support and welfare rights advice for residents and it is
proposed to use existing mechanisms to provide targeted support for islands communities. Schools have quickly identified potential
areas of spend which will mitigate cost of living challenges which particularly affect island communities. Mini-enquiries on child poverty
and the cost of living have recently been held on Arran and Cumbrae and key themes and potential mitigations have been identified. It
is proposed that local third and voluntary sector organisations will be funded to address locally identified challenges. Therefore, the
following arrangements are proposed: 
Purpose Funding allocation 
EnergySmart (existing service which supports energy efficiency measures in homes and
crisis grants). In addition, £5,000 will also be contributed from Covid Recovery funding for
this service.       
£10,000
Money Matters (existing service which supports Welfare Rights
assistance/representation to North Ayrshire residents to ensure they receive their legal
£10,000
229

Page 230

38 
entitlement to state benefits). In addition, £5,000 will also be contributed from Covid
Recovery funding for this service. 
Schools (Arran High, Arran primary schools, Largs Academy and Cumbrae Primary
School). Proposed purposes include:
• Remote, online after school study support for islands pupils who are unable to attend
in person due to costs and availability of transport;
• The introduction of laundry and other family support initiatives in schools; and
• The introduction of visiting specialists to broaden the experience of children due the
unavailability or unaffordability of transport for visits to mainland facilities and
experiences. 
£15,000 (total)
Third and voluntary sector groups on Arran and Cumbrae
Two mini-enquiries have been held on Arran and Cumbrae to identify key island
challenges in relation to the cost of living crisis. Key themes have been identified, with
potential mitigations which can be delivered locally, over and above the proposed support
(above) for energy and welfare rights advice. Connected Communities will contribute
£2,000 to the fund to provide a total allocation of £30,000 across the two islands. 
£28,000 
4) What difference
has the
investment
made? 
Future report
5) Next steps and
timescales
Work with Arran CVS and Locality partnership chairs to allocate funding to voluntary and community groups to support local
communities. 
6) Comments 
230

Page 231

39 
LiveWell Healthy Working Lives Programme 
1. Description of
funding stream,
date and amount 
LiveWell Healthy Working Lives Programme: £20k for 2022/23/24 (non-recurring funding)
2. Intended impact £20k of funding supports employee health and wellbeing through a programme of activities/events including a small grant fund.  The
Executive Leadership Team (ELT) allocates the funding which emphasises the importance of employee health and wellbeing within
the workplace.  The LiveWell Programme aims to breakdown some of the barriers that employees face when trying to improve their
health and wellbeing.  The LiveWell Programme aims to increase awareness of support and information, while wellbeing related
activities are made more accessible through reducing or negating the costs associated with participation.  This in turn improves
employee morale, wellbeing, engagement, and performance.  
3. Progress to date
against
milestones,
including
expenditure 
The LiveWell Programme has always taken an organic approach, with a framework of planned activities scheduled alongside ad hoc
opportunities.  This enables LiveWell to adapt quickly to new suggestions and ideas.  The Programme also provides small grants to
teams for health and wellbeing activities via our LiveWell Grant Scheme.  In 2022/23, £811 have been issued to various teams to carry
out wellbeing activities of their choice.
Provision of funding from the ELT has allowed the LiveWell group to explore a wider range of activities than otherwise possible.  
During Quarter 3, £3,865 was spent on Wellbeing activities, with a total of £7,236 since the start of the financial year.
4. What difference
has the
investment
made? 
Information gathered from evaluations highlights the positive difference that the wellbeing activities are having, participant comments
include - 
“it was great to find strategies to unwind and switch off. Additional links to follow up on session were really helpful and I will continue to
use these”. (Everyday Mindfulness Course) 
“It has been a skill that has changed my life. I am so appreciative of the opportunity to attend. Thank You”. (Trauma Release Exercise
programme). 
“More information on the different types of HRT available and what they target. I had no idea there were different types to tackle different
hormones. Having the opportunity to discuss my own situation and worries was invaluable”. (Menopause Awareness session). 
“I feel more confident in my new skill, I really enjoyed being out on the water and enjoyed meeting new people and having fun.  The
exercise, the good company and being out in nature helped me destress a bit too”. (Stand Up Paddleboard session) 
Employee Wellbeing
231

Page 232

40 
Short evaluations are produced on activities by topic and evaluate positively, sample evaluations are highlighted below for activities
delivered in Q3 (participant ratings out of 5 in brackets) - 
• Menopause Awareness Workshop (5 out of 5)
• Everyday Mindfulness Scotland course (4.8 out of 5)
• Trauma Release Exercise (TRE) course (5 out of 5)
• 2 x Stand-Up Paddleboarding sessions (5 out of 5)
• NHS Oral Health Team visit to Council facilities. (no ratings available but 120 employees engaged with the service).
• Bereavement Awareness Session (4.7 out of 5) 
The activities listed are those paid for from the ELT budget; other activities are also promoted that do not have a direct cost.
In addition to activities a wide range of health promotion topics are promoted via the LiveWell SharePoint page, News in Brief and
LiveWell Facebook page.  These have included – Breast Cancer Awareness (66 views*), World Mental Health Day (51 views),
Menopause Awareness (95 views), Mouth Cancer Action Month (63 views), World Cup Survival Guide, including information on sensible
alcohol consumption (123 views). 
*views on the LiveWell Sharepoint page. 
The Energy Savings Advice page of the SaveWell site was updated with additional information provided by the Energy and Sustainability
Team within the Council. 
In addition to the LiveWell Programme of activities, the following support is being provided to employees.
• Living Wage implemented from date of announcement rather than official implementation date.
• Promotion of tax relief opportunities such as income tax marriage allowance, aligned to issue of P60 issue.  Laundry allowance
and professional membership fees.
• Promotion of government childcare support scheme.
• Pay advances for those transitioning into employment with us.
• Promotion of credit unions particularly Scotwest Credit Union and all their promotions through webinars.
• Employee discounts including supermarkets. 
5. Next steps and
timescales
A calendar of wellbeing themes was created to highlight activities to the end of December 2023. Activities being planned in for Quarter
3 include – Mental Health Awareness session, Building Personal Resilience session, Everyday Mindfulness Scotland course, Sleep
Awareness, Unconscious Bias session, Menopause Awareness session; TRE (Trauma release) course, cooking videos.
6. Comments A range of wellbeing activities will continue to be planned and promoted throughout 2023/24, these will be free at point of access for
Council employees (or heavily subsidised). The qualitative comments provided in the evaluation of activities highlight both the
232

Page 233

41 
appreciation of and the benefits obtained from participating in wellbeing activities.  Many employees would not access activities if they
were not promoted through the workplace. 
233

Page 234

234

Page 235

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet 
Title:    Regeneration Delivery Plan Action Programme and
Funding Proposals 
Purpose:  To seek approval for the proposed Regeneration Delivery
Plan action programme and funding proposals 
Recommendation:  That Cabinet: 
(a) Notes the progress made on the implementation of the
Regeneration Delivery Plan; 
(b) Approves the draft Action Programme as detailed at
Appendix One; 
(c) Approves the Regeneration Delivery Plan funding
proposals as detailed at Appendix Two; and
(d) Provides delegated authority to the Executive Director
(Place) to agree changes to the funding allocations in
consultation with the Portfolio Lead as required. 
1. Executive Summary 
1.1 The Regeneration Delivery Plan was agreed by Cabinet in March 2021.  This
sets out our priorities for delivering on the regeneration ambitions of the Council
Plan and Community Wealth Building strategy, working in partnership with
communities.   
1.2 The Plan focusses on the delivery of physical regeneration across North
Ayrshire through an ambitious project based rolling action programme.  It
informs our priorities for securing and delivering against external funding
sources including Scottish and UK Government funds.  This report provides an
update on progress to date and seeks approval for the action programme for
2023/24 and 2024/25. 
2. Background 
2.1 The Council has placed the regeneration of communities at the heart of its
agenda.  This focus is reflected within the priorities of the Council Plan and
Community Wealth Building Strategy.  The Regeneration Delivery Plan sets out
Agenda Item 11
235

Page 236

our priorities for delivering on these ambitions and was approved by Cabinet on
23 March 2021.   
2.2 The Plan focuses on the delivery of physical regeneration in the period 2021 to
2026.  Informed by stakeholder consultation, reviewing existing community
priorities and the output of previous consultations, it aims to address local
priorities, support changes within communities and deliver a well-being
economy. 
2.3 Action in 2021/22 and 2022/23 substantially focussed on maximising the impact
and leverage of investment including securing sources of external funding to
support and accelerate delivery.  The following table outlines the progress and
key successes achieved to date.  This includes the completion and launch of
Lochshore Park Hub, securing an award from the Levelling Up Fund for the
B714 Upgrade and the completion and occupation of a new industrial unit at
Kyle Road, Irvine. 
Strengthening Communities
‒ Approval of the local delivery plans for the £1.32m annual allocation for
21/22 and 22/23 from the Scottish Government’s Vacant and Derelict
Land Fund (VDLF). This includes the review of the Vacant and Derelict
Land Strategy and further delivery on key regeneration sites.
‒ Completion of the new car park, path works and environmental
improvements at the former Gas Works, Dalry funded by the VDLF.
‒ Launch of new Repurposing Property Grant Fund to support landowners
and communities to bring vacant and derelict land and properties into
positive management including two rounds of awards. This is funded by
the Place Based Investment Programme (PBIP), VDLF and North
Ayrshire Ventures Trust.
‒ Securing £0.4m from the Scottish Government’s Vacant and Derelict Land
Investment Programme (VDLIP) 2022/23 to support the construction of an
additional Office pavilion at Annickbank, Irvine
‒ Securing £0.6m from the Scottish Government’s Vacant and Derelict Land
Investment Programme (VDLIP) 2023/24 to support the regeneration of
the King’s Arms, Irvine
‒ Continued development of a town centre living pilot project at 36 Bank
Street, Irvine and Howgate, Kilwinning under the PBIP. 
‒ Conclusion of the sale of Sites A and B at Montgomerie Park, Irvine to
enable the delivery of the Simplified Planning Zone and commencement
of construction.  Commencement of next phases including proposals for
neighbourhood retail site development.
Placemaking
‒ Approval of the delivery plan for the 2021/22 £1.26m allocation from the
PBIP. This included the development of a Communities Project Fund,
development of a Place Framework for Kilwinning and delivery of Phase 2
of the West Kilbride Shopfronts Scheme.
236

Page 237

‒ Approval of the delivery plan for the 2022/23 £1.096 allocation from the
PBIP including implementation of the Place Framework pilots in
Kilwinning, Largs and Saltcoats and Lochshore Park play. 
‒ Approval of the Communities and Place investment priority proposals
under the UK Government’s Shared Prosperity Fund 
‒ Securing £0.199m from the UK Government’s Community Renewal Fund
(CRF) for the development of a Place Framework Pilot in Largs and
Saltcoats informed by extensive community and stakeholder consultation.
‒ Working in partnership with Millport Town Hall Trust on Phases One and
Two of the regeneration of Millport Town Hall including securing funding
from the Scottish Government’s Regeneration Capital Grant Fund (RCGF)
and Islands Programme.
‒ Working in partnership with Ardrossan Community Development Trust to
successfully secure £0.749m from the RCGF for Ardrossan Promenade. 
‒ Completion of the Scottish Government’s Town Centre Fund (TCF) public
realm works at: Garnock Street; Kilbirnie; Main Street, Beith; and Mill Dam
and New Street, Stevenston.
‒ Completion of Phase 1 of the West Kilbride Shopfronts Scheme funded
through the TCF.
‒ Commencement of Phase 2 of the West Kilbride Shopfronts Scheme
funded through the Place Based Investment Programme.
‒ Refurbishment of the Dalry Public Park Pavilion funded through the TCF.
‒ Working in partnership with Raise Your Voice With Ardeer to deliver the
Stevenston Beach Hub project.
‒ Completion of key Phase 1 projects for the Lochshore Park Masterplan
including the Hub building and active travel route. 
‒ Launch of the Lochshore Park Hub including a Family Fun Day
‒ Commenced construction on remaining Phase 1 projects of the 5km loop
and play at the Hub.
‒ Secured £0.1m funding from Forestry and Land Scotland for the delivery
of new woodland at Lochshore Park.
‒ Commenced developing a Supplementary Street Development Guide for
North Ayrshire as a supplement to the National Roads Development
Guide created by SCOTS.
Inclusive and Green Economy
‒ Completion and occupation by a local business of a new industrial unit at
Kyle Road, Irvine funded by the VDLF.
‒ Design development and tender of Phase 3 of Pavilion development at
Annickbank Irvine including securing £0.25m from North Ayrshire
Ventures Trust towards the construction.
‒ Design development for the next phase of industrial unit development at
Kyle Road, Irvine.
‒ Contributed to the development of 10-year Island Plans for Arran and
Cumbrae.
237

Page 238

‒ Securing £0.456m from the UK Government’s Community Renewal Fund
for the Green Islands Programme incorporating the Islands Connectivity
Study.
‒ Securing £0.509m from the Scottish Government Islands Programme for
Phase Two of Millport Town Hall and £0.540m for the Islands Pit Stop
project.
‒ Supporting the development of Stevenston Climate Action Town
programme with Architecture and Design Scotland.
Enabling Infrastructure
‒ Submission of a successful application to the LUF securing £23.7m
towards the B714 Upgrade project between Saltcoats and Dalry.
Progression of the project including: the formation of a Project Board,
development of the Business Case and works to secure the necessary
consents and approvals and undertaking public and stakeholder
consultation to inform the development of the business case and design.
‒ Securing £1.31m in 2021/22 and £1.385m in 2022/23 from Strathclyde
Partnership for Transport’s (SPT) Capital Programme for the delivery of a
range of active travel and transport projects across North Ayrshire.
‒ Securing £0.18m from Transport Scotland’s Bus Partnership Fund for the
extension of the Bus Routes Congestion Measures project to the Three
Towns and to investigate the potential to extend the Stevenston Bus Lane
at Pennyburn Roundabout.
‒ Construction of active travel routes including the Bay Street to Ferry Row
section of the Fairlie Coastal Path, i3 Active Travel link in Irvine,
Kilwinning Short Links and Circuit active travel links in Irvine.
‒ Securing £0.427m from the Scottish Timber Transport Fund for upgrades
to the Ross Road on the Isle of Arran across 21/22 and 22/23 and
£0.199m for the U88 at North Sannox.
‒ Securing £0.248m across 2021/22 and 2022/23 from the Smarter Choices
Smarter Places for the continued delivery of the Trinity Active Travel Hub
and Travel Smart programme.
‒ Development of a delivery programme for the £0.259m allocation under
the Scottish Government’s Islands Infrastructure Fund to upgrade the car
parking and Electric Vehicle infrastructure on Arran and Cumbrae.
‒ Development and delivery of a £1.45m programme of active travel design
and works under the Scottish Government’s Cycling, Walking and Safer
Routes programme across 2021/22 and 2022/23.
‒ Continued delivery of the £1.96m Ardrossan Low Carbon Hub under the
European Regional Development Fund Low Carbon Travel and Transport
Challenge Fund.
‒ Commencement of the review of the Local Transport Strategy
incorporating the Active Travel Strategy informed by extensive community
and stakeholder consultation.
‒ Hosting the Pedal Irvine event as part of Pedal for Scotland in partnership
with Cycling Scotland.
238

Page 239

‒ Processed 12 Road Construction Consents in 2021 and 10 in 2022 to
enable developments to progress. Adopted roads, footways and footpaths
within 8 developments in 2021 to 2022. 
2.4 The Regeneration Delivery Plan is delivered through an ambitious rolling action
focused programme.  This approach seeks to ensure that the list of projects
never exceeds a realistic assessment of capacity, with projects being prioritised
annually. It informs our priorities for securing and delivering against a range of
external funding sources.   
2.5 The draft action programme for 2023/24 and 2024/2025 provided at Appendix
One has been prepared to align priorities with resource.  This has been
informed by an assessment of progress to date, local priorities, project
deliverability and funding.  The implementation of action programme projects
aligned to competitive funding sources will however be dependent on the
success of the funding applications. 
2.6 Significant levels of funding have been secured to support delivery in 2023/24. 
The details of the funds and the proposed approach to their expenditure are
provided at Appendix Two.  These include the: 
‒ Scottish Government’s Place Based Investment Programme
‒ Scottish Government’s Vacant and Derelict Land Fund
‒ Scottish Government’s Cycling Walking and Safer Routes
‒ Strathclyde Partnership for Transport’s Capital Programme
‒ UK Government’s Shared Prosperity Fund 
2.7 Funding applications are also proposed to a range of competitive funding
sources to support the delivery of the Plan.  The details of the funds,
applications submitted to date and proposed submissions are provided at
Appendix Two.  These include: 
‒ Scottish Government’s Regeneration Capital Grant Fund
‒ Scottish Government’s Islands Programme
‒ Scottish Government’s Vacant and Derelict Land Investment Programme
‒ UK Government’s Levelling Up Fund Round Three (if appropriate) 
2.8 Further consultation and engagement will be undertaken with local
communities, stakeholders and Elected Members through the detailed
development of any successful projects. 
3. Proposals 
3.1 That Cabinet: 
(a) Notes the progress made on the implementation of the Regeneration
Delivery Plan;
(b) Approves the draft Action Programme as detailed at Appendix One;
(c) Approves the Regeneration Delivery Plan funding proposals as detailed at
Appendix Two; and
239

Page 240

(d) Provides delegated authority to the Executive Director (Place) to agree
changes to the funding allocations in consultation with the Portfolio Lead as
required. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Regeneration Delivery Plan aims to build on and maximise the impact of
the investment being made through a variety of sources including the Ayrshire
Growth Deal, Council’s Capital Programme and the Strategic Housing
Investment Programme (SHIP). It also seeks to lever private funding and
investment into North Ayrshire. 
It informs our priorities for securing and delivering against external funding
sources.  The implementation of action programme projects aligned to
competitive funding sources will be dependent on the success of the funding
applications. 
Human Resources 
4.2 The Regeneration Delivery Plan projects will be delivered through the existing
Regeneration Team resource. Opportunities to secure funding for additional
staff resource to support delivery will be investigated on a project by project
basis as required. 
Legal 
4.3 The legal implications of all Regeneration Delivery Plan projects will be
considered through their development. Legal agreements will be developed on
a project by project basis as required with support from Legal Services.
Negotiation will be required in relation to land and building acquisitions with
support from the Council’s Legal Services and Property Management and
Investment Service. Mechanisms such as Compulsory Purchase Orders will be
considered on a case by case basis, where considered appropriate. 
Equality/Socio-economic 
4.4 The Regeneration Delivery Plan assists in meeting our socio-economic duty as
set out in the Fairer Scotland Duty. It seeks to reverse economic, social and
physical decline and reduce socio-economic disadvantage. It will tackle long-
term vacant and derelict land and buildings thereby reducing their levels and
impact on communities. It aims to build community wealth and tackle local
deprivation through the regeneration of our communities by maximising the
potential of our land and assets and those of anchor institutions. 
The Plan also contributes to the delivery of the Isle of Cumbrae and Isle of
Arran Local Island Plans, their key themes and priorities. The funding proposals
will directly contribute to several of the actions identified within the annual
action plans. The proposals for the Scottish Government’s Islands Programme
240

Page 241

have been informed by the Islands Plans and identified from the Action
Programmes. 
An initial screening will be undertaken to establish if an Equality and Children’s
Rights Impact Assessment is required for projects on a case by case basis. 
Climate Change and Carbon 
4.5 The Regeneration Delivery Plan aligns with the Environmental Sustainability
and Climate Change Strategy workstreams of: Green Economy; Transport and
Travel; Natural Environment; Sustainable Operations; and Carbon Absorption.
Furthermore, it aligns with the commitment to reduce carbon emissions through
declaration of a Climate Emergency and will contribute to the ambition to
achieve net zero by 2030. 
Key Priorities 
4.6 The Regeneration Delivery Plan has been informed by the priorities identified
within the Local Outcomes Improvements Plan and Locality Partnership
priorities. The implementation of the Plan will contribute to achieving the
Council Plan priority outcomes and will contribute to the ambitions for: an
inclusive, growing and enterprising economy; North Ayrshire to be well-
connected with effective infrastructure; and for a sustainable, vibrant,
welcoming and attractive environment. 
Community Wealth Building 
4.7 The Regeneration Delivery Plan sets out our priorities for delivering on the
ambitions on the Community Wealth Building Strategy. Its delivery will have a
significant positive impact on the Council’s ambitions across the pillars of: 
- Land and Assets: by supporting equitable land development and the
development of underutilised assets for community use.
- Procurement: by contributing to the development of the procurement wave
plan; through the inclusion of appropriate community benefit of local
supplier clauses within projects; and by considering phasing and
programming of projects to create local supply chain opportunities and
support delivery by smaller scale and local contractors where appropriate.
- Fair Employment: by supporting the creation of employment opportunities
particularly within the construction sector. Where North Ayrshire is
procuring services, through our enhanced Community Benefits approach
we will seek to ensure the creation of local training and work experience
opportunities.  Consideration will also be given to delivery through
employability programmes where appropriate.
- Financial Power: by investing in localities and leveraging external national
investment into North Ayrshire. 
241

Page 242

5. Consultation 
5.1 The Regeneration Delivery Plan was the subject of extensive consultation
including workshops with Council Officers; workshops with Elected Members;
reports to and feedback from North Ayrshire Ventures Trust and the Community
Wealth Building Expert Panel; and public engagement via Consul. It was also
informed by the Locality Partnerships’ priorities and previous public consultation
exercises including Charettes. 
5.2 The action programme outlined at Appendix One and the funding proposals
outlined at Appendix Two have been informed by this consultation.  Further
consultation and engagement will be undertaken with local communities,
stakeholders and Elected Members through the detailed development of the
identified projects. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Claire Fitzsimmons, Interim Senior
Manager Regeneration, on 01294 324766. 
Background Papers
Cabinet Report – Regeneration Delivery Plan, 23 March 2021
Cabinet Report – Levelling Up Fund, 15 June 2021
Cabinet Report – Levelling Up Fund – Round 2, 2 November 2021
Cabinet Report – Regeneration Delivery Plan Update, 22 February 2022
Cabinet Report – Regeneration Delivery Plan Funding Proposals. 07 June 2022
242

Page 243

Appendix One: Draft Action Programme
The following summarises the draft action programme for 2023/24 and 2024/25 under each Regeneration Delivery Plan theme: 
Strengthening Communities    
Maximising Land and Assets      
2023-25 Action Updated 2026 Outcome  Lead Service
Review of land and
assets
Public consultation, finalisation and
adoption of Vacant and Derelict Land
Strategy for 2023-28
Confirmation of vacant and derelict land
priorities and actions and implementation of
Years 1 and 2 
Economic
Development, Growth
& Regeneration
(EDG&R) 
Review of land and
assets
Prepare annual local delivery plans for SG
approval under the Vacant and Derelict
Land Fund (VDLF), and projects for
submission to the Vacant and Derelict Land
Investment Programme (VDLIP)
Implementation of vacant and derelict land
priorities on an annual basis under the
Vacant and Derelict Land Fund and Vacant
and Derelict Land Investment Programme
(VDLIP)
EDG&R 
Development
potential of land
and assets
Review the development potential of
Council landholdings to inform the Local
Development Plan 3 (LDP3)
Clarity on the priority sites for intervention
and/or investment
Housing and Public
Protection (H&PP) /
EDG&R 
Investment in land
and assets
Implement the Repurposing Property Grant
Fund (RPGF) including development of
further phases, subject to external funding
Landowners and communities are
supported to bring vacant and derelict land
and properties back into positive use
EDG&R
Investment in land
and assets
Identify opportunities and priorities for
future investment 
A social housing and commercial portfolio
that supports the needs of communities and
the growth of local businesses and
entrepreneurial activity
EDG&R / H&PP
Levelling Up Fund Identify priorities for consideration of
potential submission to Round 3 of the UK
Government's Levelling Up Fund 
Levelling Up funding is secured to support
capital investment in identified priorities
EDG&R
243

Page 244

Housing and Town Centre Living     
Strategic Housing
Investment
Programme (SHIP)
Construct new social housing sites
including Corsehillhead, Kilwinning;
Bourtreehill, Irvine; Ayrshire Central, Irvine;
Fullarton Street, Irvine; and West Byrehill,
Kilwinning
Delivery of 1,900 unit SHIP programme to
2026
H&PP
SHIP Review of SHIP contribution to community
regeneration
Identification of priority sites and process
for selection of opportunities
H&PP / EDG&R
Housing Delivery Preparation of Supplementary Guidance for
Development Frameworks
Approval by Planning Committee;
Implementation of Guidance
H&PP
Housing Delivery Preparation and approval of development
frameworks for strategic sites
Approval by Planning Committee;
Implementation of development
frameworks; Completion of developments
EDG&R
Housing Delivery Analysis of the most suitable delivery
mechanism for housing on strategic sites
Delivery of appropriate development on
NAC owned strategic sites in line with CWB
strategy and LHS
EDG&R / H&PP
Housing Delivery Next phase of Montgomerie Park delivery
including marketing of further phase(s) and
site start(s)
Completion of Sites A-B housing
development; retail site sale and
development; and marketing land, sale and
site start for remaining phases
EDG&R
Town Centre
Living
Review of potential sites for increased town
centre living given decline in retail activity
and complete town centre living pilot project
New residential development in town
centres 
EDG&R / H&PP
Town Centre
Living
Redevelopment of Kings Arms, Irvine to
deliver amenity flats
Completion of development H&PP
Community Investment and Enterprise 
Community Project
Development
Support new community project
development, physical regeneration
projects, funding applications and asset
transfer processes and delivery including
Ardrossan Promenade
Identification and delivery of community
development and community led
regeneration projects
Connected
Communities (CC) /
EDG&R
244

Page 245

Community Project
Development
Develop a grant funding CRM to manage
Council grant processes including the
creation of an expression of interest
process to identify a pipeline of projects for
submission to external funding sources
Identification and delivery of community
development and community led
regeneration projects
EDG&R / CC
Shared Prosperity
Fund
Implement the approved Shared Prosperity
Fund Investment Plan including facilitating
governance arrangements
Implement and administer the North
Ayrshire award under the Shared Prosperity
Fund 
EDG&R / CC
Shared Prosperity
Fund
Implement Council priority projects under
the Communities and Place Investment
Priority informed by Place Frameworks
Delivery of Council led projects under the
Shared Prosperity Fund Communities and
Place Investment Priority
EDG&R / CC
Shared Prosperity
Fund
Develop and implement a Shared
Prosperity Fund Communities and Place
Fund
Identification and delivery of community
development projects under the Shared
Prosperity Fund Communities and Place
Investment Priority
EDG&R / 
CC
Locality
Partnerships
Coordinate the identification and delivery of
community development projects through
the operation of Locality Partnerships
Identification and delivery of community
development projects
CC
Participatory
approaches
Extend and mainstream a participatory
approach to offer communities, including
young people, more opportunities to lead in
local decision-making
Increased community involvement decision-
making
CC
Community Asset
Transfer
Support Community Asset Transfer and
Participation Requests  
Increased community ownership of land
and property and redevelopment of
underutilised assets
CC
Community
Investment Fund
Co-design, co-production and co-delivery of
projects
Identification and delivery of community
development projects
Locality Partnerships
/ CC 
245

Page 246

Delivery Models  
Third Party Assets
Review
Review the identified sites including the
case for the purchase of third-party land to
address a recognised problem or facilitate
positive development – including sites
identified through the RDP
A property portfolio that supports
communities, improved public amenity and
the growth of local businesses and
entrepreneurial activity
EDG&R
Land Development
Model
Develop a model for the development and
sale of vacant land/property and
reinvestment in further programme
Confirmation and implementation of model EDG&R
Commercial Estate Develop proposals for Commercial Estates,
Infrastructure and Town Centre allocation
under the Recovery and Renewal
Investment Fund and external funding
sources
Identification and implementation of priority
projects
EDG&R
Placemaking      
Town and Local Centres 
Updated 2023-25 Action Updated 2026 Outcome  Lead Service
Place Framework
Development
Roll out of programme of Place
Frameworks to direct future investment
through the Investment Fund, Place Based
Investment Programme and external
funding
Use of Place Framework to facilitate
community consultation and to direct and
implement projects contributing to a
wellbeing economy
EDG&R / CC
Place Framework
Development
Implementation phase of pilot place
frameworks for Kilwinning, Saltcoats and
Largs. 
Use of Place Framework to facilitate
community consultation and to direct and
implement projects contributing to a
wellbeing economy
EDG&R / CC
Place Plan
Development
Support local communities to develop Local
Place Plans under the Planning Act
Community development of Local Place
Plans
H&PP / CC / EDG&R
Town Centre
Improvements 
Completion of SG funded Town Centre
Fund projects 
Implementation of projects EDG&R
246

Page 247

Town Centre
Improvements 
Investigate potential to upgrade grass pitch
provision and implementation of any
recommendations
Completion of Quarry Road project EDG&R/ CC / KA
Leisure
Town Centre
Improvements 
Identify and adopt a new approach to town
centre footfall monitoring
Effective monitoring of town centre activity EDG&R
Town Centre
Improvements 
Prepare an investment plan for Years 3 to 5
of the Place Based Investment Programme
allocation working collaboratively with local
communities, business, third and public
sectors
Implementation of projects identified in
Investment Plan
EDG&R
Town Centre
Improvements 
Develop and implement proposals for CWB
- Town Centres and Communities allocation
under the Recovery and Renewal
Investment Fund
Identification and implementation of town
centre priority projects
EDG&R
Conservation
Projects
Completion of Millport Conservation Area
Regeneration Scheme
Completion of project EDG&R
Conservation
Projects
Identification of potential conservation
projects through the development of Place
Frameworks and Local Place Plans
Development and implementation of
conservation projects
EDG&R
Strategic Sites      
Ardrossan North
Shore & Marina
Deliver the next phases of civil
infrastructure to support the Ardrossan
Campus including delivery of a programme
to facilitate the delivery of the Campus
Supporting the completion of the Ardrossan
Campus
EDG&R
Ardrossan North
Shore & Marina
Develop a major Branding exercise to
reflect the national scale regeneration
opportunity including North Shore, Harbour
and town centre
Secure appropriate press coverage and
community understanding of investment in
town, changing perceptions at key points in
the programme’s delivery
Communications
247

Page 248

i3 Enterprise Area Operation of Phase 1 of the Digital
Processing Manufacturing Centre (DPMC)
digital hub. Delivery and occupation of
Phase 1 of the flexible space programme
and development of Phase 2 project
Delivery of AGD investment and leverage of
private investment
EDG&R
Irvine Harbourside,
‘Great Harbour’
Development and implementation of the
Great Harbour Masterplan informed by
community and stakeholder consultation
Delivery of AGD investment and leverage of
private investment
EDG&R
Lochshore Completion of £8m Phase One of the
Lochshore Park Masterplan including: 5km
circular loop; Play at the Hub; woodland
creation and community play links
Completion of Phase One of the Lochshore
Park Masterplan
EDG&R
Lochshore Identify funding opportunities, submit
applications and secure funding for Phase
Two delivery
Completion of Phase Two of the Lochshore
Park Masterplan (subject to funding)
EDG&R
Lochshore Identify opportunities to fund and deliver
Lochshore Masterplan Phase 2 including:
appointing project team, formalising
governance arrangements, and
commencing delivery (subject to funding)
Completion of Phase Two of the Lochshore
Park Masterplan (subject to funding)
EDG&R
Lochshore Delivery of Play at the Hub Completion of Phase One of the Lochshore
Park Masterplan
EDG&R
Hunterston Development of options for site with
partners Peel Ports Group and SE 
Hunterston is recognised as a strategically
significant national asset contributing to
local, regional and national blue and green
economy aspirations. 
EDG&R 
Growth Deal Plans 
248

Page 249

Growth Deal
Delivery
Delivery of North Ayrshire’s share of the
£251m Growth Deal programme including:
manufacturing space and a digital hub at i3
in Irvine, International Marine Science &
Environmental Centre at Ardrossan; Centre
for Research into Low Carbon Energy &
Circular Economy at Hunterston; the
development of island marina projects and
the Great Harbour project in Irvine 
Delivery of Growth Deal investment and
leverage of partnership and private sector
funding
EDG&R
Leverage of AGD
funding
Securing additional leverage including
private sector investment and external
funding 
Additional funding and profile to enhance
the outcomes achieved through the AGD
EDG&R
Destinations / Visitor Hubs 
Commercial/leisure
investment in
Ardrossan 
Review of market potential for commercial
opportunities within Ardrossan
Delivery of new commercial uses alongside
public investment
EDG&R
Inclusive and Green Economy
Inward Investment 
Updated 2023-25 Action Updated 2026 Outcomes Lead Service
Supporting inward
investment
Engage with existing and new businesses
to support inward investment including the
co-ordination and review of enquiries and
assessment of contribution to net zero,
CWB and socio-economic impact 
Inward investment is secured across North
Ayrshire
EDG&R
Supporting inward
investment
Review NAC land and assets’ potential to
deliver on inward investment enquiries  
Inward investment is secured across North
Ayrshire
EDG&R
Development of Commercial Estate
249

Page 250

Commercial estate
improvements
Review of commercial estate to identify
opportunities to improve or redevelop
council assets to encourage local business
growth utilising Investment Fund
Improvement of commercial estate to allow
business growth
EDG&R
Commercial estate
development
Completion of technical design, funding
secured and contractor appointed for
additional office pavilion at Annickbank for
construction in 23/24
Completion and long-term lease of space,
securing local employment
EDG&R
Commercial estate
development
Identify opportunities and apply for funding
to support the delivery of new commercial
estate development
New commercial estate development to
support business growth (subject to
funding)
EDG&R
Commercial estate
development
Implement next phase of commercial estate
development at Kyle Road, Irvine including:
securing funding package and necessary
permissions and consents
Completion and long-term lease of space,
securing local employment
EDG&R
Commercial estate
development
Review of third-party assets for acquisition
to support commercial estate delivery
Improvement of commercial estate to
support business growth
EDG&R
Harbourmasters
House, Irvine
Improvement of derelict Council property
and development of proposals for market
opportunity
Delivery of new commercial uses alongside
public investment at Great Harbour
EDG&R
Partnership Activity 
Islands Recovery
and Renewal Pilot
Implement ten year Island Plans for Arran
and Cumbrae working in partnership with
local island communities and stakeholders,
Highlands and Islands Enterprise and the
Scottish Government
Development of strategic Island Plan
projects and leverage of external funding
EDG&R
Islands Recovery
and Renewal Pilot
Develop and facilitate Island Plan Delivery
Groups
Long term strategic direction and
community and stakeholder engagement in
the implementation of Island Plans
EDG&R
250

Page 251

Partnership
Opportunities
Identify partnership opportunities for
regeneration delivery with private sector
and third sector
Partnership opportunities for delivery and
maximisation of funding and resources
EDG&R 
Ardeer Continue to engage with NPL to identify any
opportunities at Ardeer that complement the
AGD Great Harbour masterplan investment
at Irvine Harbour and Beach Park.
Delivery of AGD investment and leverage of
private investment
EDG&R 
Enabling Infrastructure
Transport Infrastructure  
Updated 2023-25 Action Updated 2026 Outcome Lead Service
Ardrossan Harbour Finalise funding package and partner
agreements; and Publication of tender
package and award of contract for marine
and landside works to enable construction
Completion of harbour regeneration
programme with partners
EDG&R
Transport Policy Public consultation, finalisation and
adoption of Local Transport Strategy for
2023-28
Confirmation of local transport priorities and
actions for implementation
EDG&R
Transport Policy Promotion of North Ayrshire transport
priorities for inclusion within national and
regional transport policy including the
Regional Transport Strategy (RTS) and
Islands Connectivity Plan (ICP)
Funding and delivery of local and regional
transport priorities
EDG&R
Transport Policy Support the completion of the B714
Upgrade Full Business Case and design
processes including submission to UK
Government to facilitate construction
Completion of B714 Upgrade EDG&R and
Neighbourhood
Services (NS)
Active Travel Identify priorities for and implement new
and improved active travel route
infrastructure across North Ayrshire
informed by the revised LTATS
Securing external funding and
implementation of projects
EDG&R
251

Page 252

Active Travel Implement the recommendations of the
Community Renewal Fund Islands
Connectivity Study with partner
organisations
Delivery of a network of infrastructure to
support active and sustainable travel and a
Mobility as a Service pilot project on Arran
and Cumbrae.
EDG&R
Active Travel Complete the Ardrossan Connections
Street Design Project focused on Glasgow
Street, Princes Street and Montgomerie
Street with Sustrans
Implementation of improvements to
encourage active travel, improve residential
environment and link major development
projects
EDG&R 
Public Transport Investment in public transport infrastructure
improvements informed by the revised
LTATS
Improvement of the public transport
network for everyday journeys
EDG&R
External Grant Support
External Funding Work with partners to identify funding
opportunities and submit funding
applications to maximise the potential of
regeneration resources and funding
Submission of successful funding
applications on an annual basis to enable
project implementation
EDG&R
Community
Funding
Support communities to identify funding
opportunities and submit funding
applications to implement community
regeneration priorities
Submission of successful funding
applications on an annual basis to enable
project implementation
CC / EDG&R
Digital Infrastructure
Broadband Support the roll out of R100 Broadband
programme and raise awareness of the
Scottish Broadband Voucher Scheme
(SBVS) and the UK Gigabit Broadband
Voucher Scheme
Improved broadband coverage across area
and increased vouchers uptake
EDG&R
Connectivity Develop the Digital Renewal route map and
approach to support Digital Economic
Transformation, focusing on four pillars:
Connectivity (including infrastructure),
Digital Skills, Innovation, and Digital
Inclusion
Improved digital connectivity growing a
strong and resilient digital economy
delivering digital economic transformation 
EDG&R
252

Page 253

Strategic
Connectivity
Review the digital investment through AGD
to maximise the benefits to gain a
competitive business advantage and
support the development of a Digital
Masterplan for Ayrshire
Delivery of digital investment to secure
competitive advantage for North Ayrshire
and support business growth and
encouraging private sector investment
EDG&R
Low Carbon Economy
Review of land and
assets for low
carbon delivery
Review of potential for land assets to
support low carbon project delivery and
contribute to net zero targets including: new
tree planting; renewable energy; food
growing; and electric vehicle projects
Maximisation of land and assets to deliver
low carbon projects and Contribution to net
zero ambitions
EDG&R / NS /
Sustainability,
Corporate Property &
Transport (SCP&T)
Delivery of low
carbon projects
Identify opportunities for innovative delivery
of low carbon projects including tree
planting; renewable energy; food growing;
and electric vehicle projects
Delivery of low carbon projects and
contribution to net zero ambitions
Physical Environment
/ NS / EDG&R /
Flood Protection
Schemes
Implementation of the Millport Coastal
Flood Protection Scheme and development
of the River Irvine Scheme
Implementation of flood protection schemes NS
Active Travel Hub Deliver the Trinity Active Travel Hub and
Travel Smart programme to support active
and sustainable travel
Modal shift to active and sustainable travel /
contribution to net zero ambitions
EDG&R
Low Carbon Hub Complete the £1.96m ERDF Low Carbon
Travel and Transport funded Ardrossan
Low Carbon Hub including path works, e-
bike and EV infrastructure implementation.
Delivery and implementation of the project EDG&R 
Solar Photovoltaic
Farm development
Detailed development of Solar PV Farm at
Nethermains and Shewalton, Irvine
including: procurement, planning, grid
connections and design.  Investigation of
renewables opportunities at i3
Completion of Solar PV farms by end of
2024; regeneration of the former
Nethermains and Shewalton Landfill Sites;
and contribution towards net zero ambitions
SCP&T 
253

Page 254

Appendix Two – Regeneration Delivery Plan Funding Proposals 
The following provides a summary of each of the funds and the proposed approach for
2023/24. Funding awards are generally received on an annual basis therefore a further
report will be provided for 2024/25 awards.  The proposals have been identified from the
Regeneration Delivery Plan action programme and an assessment of the: 
- Projects’ stage of development;
- Fit with the fund objectives and priorities;
- Potential benefits;
- Budget available;
- Ability to secure match funding; and
- Deliverability of the project(s) within funders’ timescales. 
This approach aims to implement a range of projects that deliver impactful improvements in
line with the Regeneration Delivery Plan and the various funding streams’ ambitions. 
Where there is an underspend within one of the allocations in 2023/24, it is proposed that
the Executive Director (Place) will reallocate any underspend across the other identified
actions following engagement with the Portfolio Lead. 
Place Based Investment Programme 
The Scottish Government established the five year £325m Place Based Investment
Programme (PBIP) in 2021/22. Underpinned by the Place Principle, this aims to support
community-led regeneration, town centres and the 20-minute neighbourhood ambitions.
The main objectives of the Programme are to: 
- Link and align place based initiatives and establish a coherent local framework to
implement the Place Principle;
- Support place policy ambitions such as town centre revitalisation, community led
regeneration, 20 minute neighbourhoods and Community Wealth Building;
- Ensure that all place based investments are shaped by the needs and aspirations 
- of local communities; and
- Accelerate the ambitions for tackling inequality and disadvantage, wellbeing and
inclusive economic development, net zero, community involvement and ownership 
Local Government is a key partner in delivering the Programme and will receive a share of 
the funding over the five years to support and advance local priorities. A £0.761m allocation
has been received for the current financial year. This requires to be fully expended or at a
minimum financially committed by 31 March 2024. Any unused grant will require to be
repaid to the Scottish Government unless otherwise agreed by Scottish Ministers. 
The table below outlines the proposal for the expenditure of the allocation.  The proposals
aim to support the delivery of the Place Frameworks prepared through the previous
allocations and the UK Government’s Community Renewal Fund. Furthermore, they aim to
continue the development of Place Frameworks across North Ayrshire.  
254

Page 255

Project Allocation
Lochshore Park Hub Play
To construct play facilities at the Hub.
£50,000
Kilwinning Abbey Tower Repair
To support repairs to Kilwinning Abbey informed by the Kilwinning Place
Framework.
£100,000
Stevenston Climate Action Town: Projects Fund
To support the delivery of the recommendations of the Climate Action
Town Report.
£35,000
Town Centre Living Pilot: 36 Bank Street, Irvine
To support the completion of the design and tender process.
£25,000
Future Year Project Development
To support the preparation of proposals for implementation in future years
and support funding applications.
£40,000
Repurposing Property Grant Fund
To support the continued provision of the Fund.
£60,000
Kyle Rd Phase 2 
To support the delivery of 1200m² new Class 4/5/6 business space
capable of sub-division.
£400,000
PBIP Regeneration Officer
This will meet the costs associated with the dedicated Regeneration
Officer to support the delivery of the Programme.
£51,000
Total £761,000 
Vacant and Derelict Land Fund 
The Scottish Government's Vacant and Derelict Land Fund (VDLF) aims to tackle the
presence of long-term vacant, for 15 years or longer, and derelict land in Scotland. In doing
so, it aims so stimulate economic growth, job creation, an improved environment and
quality of life. From its inception in 2007, access to the Fund was restricted to 5 local
authorities to focus the available financial resource and prioritise authorities most impacted
by both the extent of vacant and derelict land and levels of deprivation. 
A review in 2015, resulted in North Ayrshire Council benefitting from access to the Fund 
from the financial year 2016/17. The other four authorities which currently benefit are South
Lanarkshire, North Lanarkshire, Fife and Glasgow City Councils. Funding is limited to sites
that have been vacant for at least 15 years and are between 0.1ha and 99ha in size, with a
preference of Council ownership or a landowner agreement in place. It cannot be used on
housing or infrastructure projects such as transport or flooding. 
A Local Delivery Plan requires to be submitted to the Scottish Government to allow
Ministerial approval of the expenditure of the funding in 2023/24. In developing the
proposals for this, several factors have been considered, including the: 
- Scottish Government funding criteria;
- Economic development focus of the funding;
- The priority sites identified of Irvine Enterprise Area, Ardrossan Campus Site, Lochshore
and Irvine Harbourside and their stage of development;
255

Page 256

- Alignment with the North Ayrshire Regeneration Delivery Plan (2021) and Vacant and
Derelict Land Strategy (2014) and the current draft Vacant and Derelict Land Strategy;
- Deliverability of projects within the funding timescales;
- Need to balance feasibility and site preparation work, with interventions that see
physical space and employment created;
- Need to secure a spread of interventions in terms of type and geography; and
- Scottish Government’s aspiration for circa 25% to be spent on greening projects. 
An allocation of £1.507m has been confirmed for 2023/24.  The following projects are
proposed for inclusion in the local delivery plan.  This has been submitted to the Scottish
Government, subject to Cabinet approval: 
Project Allocation
Kyle Rd Phase 2 
To support the delivery of 1200m² new Class 4/5/6 business space capable
of sub-division. 
£1,132,000 
Montgomerie Park Neighbourhood Centre 
To support environmental improvements and ground works adjacent to the
new Montgomerie Park Primary 
£175,000 
Stalled Spaces Fund 
To support the visual improvement or naturalisation of sites, including grant
funding to community groups for temporary repurposing of sites. 
£125,000 
Development Work 
To support surveys and investigations to inform proposals for
implementation in future years. This will include grant funding to support
landowners and community groups to bring back vacant land and
properties to positive use by funding feasibility studies, investigation work
and statutory approvals 
£75,000 
Total  £1,507,000 
Cycling, Walking and Safer Routes 
The Scottish Government’s Cycling Walking and Safer Routes programme provides direct
allocations to Local Authorities.  This can only be used for cycling, walking, safer routes and
active travel related projects.   
It is proposed that the £857,000 award received for 2023/24 be allocated as follows.  This
approach aims to support a range of eligible projects across North Ayrshire and secure
additional funding to maximise and accelerate delivery. 
Project Allocation
Local Transport and Active Travel Strategy
To support Year 1 delivery and implementation of the active travel strategy
action plan, which will be considered by Cabinet after the Recess.
£250,000
Active Travel Route Construction
To provide match funding to support applications to Sustrans Places for
Everyone and other active travel funding programmes.
£200,000
Future Years Feasibility Studies and Design Development
To support the preparation of feasibility and studies for active travel
projects.
£100,000
256

Page 257

Ardrossan Low Carbon Hub
To provide an additional match funding contribution towards the path
creation element of the ERDF Low Carbon Travel and Transport Challenge
Fund Project.
£150,000
Route Monitoring 
To support the network of pedestrian and cycle counters across North
Ayrshire including the installation of new infrastructure.
£35,000
Staff costs and resourcing
To support the existing externally funded posts within the Active Travel and
Transport Team and provide match funding toward the Travel Smart
project funded by Smarter Choices Smarter Places.
£122,000
Total £857,000 
Strathclyde Partnership for Transport Capital Programme 
Strathclyde Partnership for Transport’s (SPT) Capital Plan sets out the funding programme
for projects to be delivered by SPT and partners on an annual basis.  Applications are
invited from Local Authorities in the Autumn of the preceding year.  Priorities for funding are
informed by the National, Regional and Local Transport Strategies.   
The following projects have been allocated funding through the overall £1.03m award from
2023/24 Capital Programme: 
Project  Award 
Ardrossan Harbour Interchange
To support the tender process for the public transport interchange at the
Harbour.
£50,000
B714 Active Travel Links
To tender and construct the first phase of active travel links in Dalry and
Saltcoats designed in 2022/23 to improve local path networks.
£400,000
Brodick to Corrie Cycle Path
To deliver the next phase of the off-road National Cycle Network (NCN)
Route 73 at Brodick Castle and Country Park.
£80,000
Bus Corridor Improvements
To deliver a programme of bus stop infrastructure improvements across
North Ayrshire.
£100,000
Cumbrae Ferry Bus Stop and Queuing Facilities
To deliver the next phase of recommendations of the feasibility study
developed in 2021/22 including detailed designs and construction
£350,000
Irvine Cycle Friendly Town
To deliver the next phase of the Irvine Cycle Friendly Town Study
recommendations including new path construction and signage.
£50,000
Total £1,030,000 
257

Page 258

Shared Prosperity Fund 
The Communities and Place investment priority of the Shared Prosperity Fund aims to
enable places to invest to restore their community spaces and relationships and create the
foundations for economic development at the neighbourhood-level.  Its objectives are to
strengthen the social fabric and foster a sense of local pride and belonging and build
resilient, healthy and safe neighbourhoods. 
The investment priority requires Councils to be mindful of how interventions under this
priority align with the existing funding streams received from the Scottish Government
including the Place Based Investment Programme.  The alignment with Scotland’s National
Strategy for Economic Transformation (NSET) also requires to be considered to ensure that
they contribute to a fairer and more equal society, new market opportunities and productive
businesses and regions. 
Thirteen interventions are identified under the investment priority.  The approved North
Ayrshire Investment Plan supports delivery of projects across the range of interventions. 
The approved Investment Plan outlined that the Communities and Place investment priority
would be comprised of a: Participatory Budgeting programme; Competitive grant scheme
for communities; and Funding allocation for Council projects.  £349,208 capital and
£107,106 revenue funding has been allocated to support smaller scale Council led projects
that meet the aims and objectives of SPF and allow the Council to meet strategic goals.
These projects will be aligned to the Regeneration Delivery Plan. Wherever possible match
funding will be sought to support the delivery of these projects. 
Scottish Government’s Regeneration Capital Grant Fund 
The Scottish Government’s Regeneration Capital Grant Fund (RCGF) is delivered annually
in partnership with COSLA and local government. It supports locally developed place-based
regeneration projects that involve local communities, help to tackle inequalities and deliver
inclusive growth in deprived, disadvantaged and fragile remote communities across
Scotland. 
The Fund is subject to a two-stage assessment process. Applicants are required submit a
summary of their project on the form provided at Stage 1 by 21 June 2023. Successful
projects at this stage will be invited by the panel to then complete a full Stage 2 application
in October 2023. An independent investment panel will agree the recommendations to
Scottish Ministers and COSLA on projects to be offered grant support. 
The Fund is primarily aimed at providing new and/or improved infrastructure to improve the
economic, social, and physical environment of communities. Projects are expected to detail
how they are considering and contributing towards the target of net zero carbon emissions
by 2045. Projects should also: 
- Primarily focus on areas that suffer from high levels of deprivation and disadvantage; 
- Demonstrate clear community involvement;
- Deliver large scale transformational change with strong regeneration outcomes; and 
- Encourage additional investment and address market failure. 
Officers from Connected Communities and Economic Development and Regeneration 
have supported with local groups and organisations to identify potential projects for 
submission to the Fund. This process has been informed by the funding criteria, key 
258

Page 259

considerations and the level of community involvement based on the experience from 
previous successful applications. On this basis is it recommended that applications be 
submitted for the following 4 projects, listed in order of priority: 
i) Geilsland Courtyard Hall, Beith 
ii) Harbour Arts Centre, Irvine  
iii) Great Harbour Phase 1, Irvine 
iv) Eglinton Park Visitor Centre, Kilwinning 
v) Kilwinning Abbey Tower, Kilwinning 
Scottish Government’s Islands Programme 
The Islands Programme represents a £30million capital investment over five years to
support the delivery of the National Islands Plan. It aims to support projects which
encourage population growth and stem population decline and deliver on net zero
ambitions in a way that no-one is left behind. This will support a green economic recovery
from the ongoing impacts of the COVID-19 pandemic.   
The Programme is being delivered on a competitive bid basis across all six local authorities
with islands with a budget of £4m in 2023/24. It is open to applications from the six island
Local Authorities including North Ayrshire Council. The Councils are required to act as the
lead applicant. Project proposals are however expected to have been developed with the
involvement and support of relevant communities, as well as third sector and private sector
partners as appropriate. 
For 2023/24 there will only be a one stage application process.  Project proposals require to
use clear Place based, Community Wealth Building principles to support inclusive island
growth while working to achieve Scottish Government’s net zero ambitions and to support
recovery from the impacts of the pandemic.  They should: 
- Meet the overall objectives of the Islands Programme.
- Link directly to at least one of the National Islands Plan Strategic Objectives.
- Ensure transformational impact against place-based priorities to accelerate local growth
and resilience.
- Align with local critical infrastructure priorities and have the potential to collaborate with
other place-based investment opportunities to maximise benefits.
- Demonstrate project readiness, collaborative and partnership models, project viability
and long-term sustainability.
- Demonstrate clear Community Wealth Building principles and community involvement
and engagement.
- Support Scottish Government Net Zero Ambitions and a Just Transition. 
Officers from Connected Communities and Economic Development and Regeneration 
supported local groups and organisations to identify potential projects for submission to the
Fund. This process was informed by the funding criteria, key considerations and the level of
community involvement. Informed by this assessment two applications were submitted for
the following two projects and have subsequently received awards from the Programme: 
i. Garrison House Regeneration Scheme (Project Value £950,934): £730,998 grant
sought to restore, re-purpose and enhance the Garrison House complex in Millport,
Isle of Cumbrae. This will secure the building fabric for future generations, improve
259

Page 260

accessibility, improve the availability of and access to services, and increase its
energy efficiency and resilience to climate change.
ii. Dyemill Park (Project Value £570,000): £220,625 grant sought to build, manage and
maintain an accessible, inclusive and safe, all-weather environment to grow and
develop the island’s cycling community, inspiring Arran to cycle.   
Priorities for the 2024/25 round of the programme will be identified through engagement
with the Island Plan Delivery Groups.  It is intended that project progress reports will be
provided to the Island Delivery Groups’ meetings to provide an opportunity to engage in
and contribute to the projects’ delivery, where appropriate. 
Scottish Government’s Vacant and Derelict Land Investment Programme 
The Scottish Government announced a 5 year £50M competitive Vacant and Derelict Land
Investment Programme (VDLIP) in 2021/22. This aims to tackle persistent vacant and
derelict land and support place based approaches to delivering regeneration and
sustainable inclusive growth, as part of a ‘just transition’ to net-zero by 2045. The fund
complements the Place Based Investment Programme and is open for all local authorities
in Scotland to apply. 
Potential projects were identified for the 2023/24 round based on the funding criteria, level
of project development and delivery timescales with Council Services.  The following
applications are proposed for submission in order of priority: 
i) Kyle Road Phase 2
ii) 36 Bank Street Town Centre Living Pilot 
UK Government’s Levelling Up Fund 
The Levelling Up Fund (LUF) is a £4.8 billion capital investment fund that will support town
centre and high street regeneration, local transport projects, and cultural and heritage
assets. North Ayrshire has been allocated as a ‘priority one’ category authority given our
socio-economic and connectivity challenges. 
This is a competitive bidding process against other local areas and the Council requires to
put forward high-quality, detailed and compelling business cases which meet the LUF
criteria. There are 4 assessment criteria for the fund: place (priority area categories),
strategic fit, value for money and deliverability. 
Two applications were submitted to Round 2 of the Fund: 
• Lochshore Park – This aimed to accelerate the delivery of Phase 2 of the Lochshore
Park project through the transformation of the former steelworks site, including 64.73ha
of Vacant and Derelict land, into an attractive area of parkland with a focus on outdoor
play and active lifestyles.
• Levelling Up for Ayrshire: Commercial and Low Carbon Infrastructure – This partnership
project with South Ayrshire Council aimed to deliver new commercial estate
development to increase capacity in Irvine and Prestwick.  This focused on three long
term vacant and derelict land sites at Annickbank, Kyle Road and i3 Enterprise area.  It
also included low carbon infrastructure to improve active and sustainable travel links.   
260

Page 261

Both applications were confirmed as being unsuccessful in January 2023.  An explanatory
note was issued on 19 January 2023 regarding the decision making process.  This advised
that Ministers took account of which local authorities had received funding in the first round,
noting that this would help maximise the geographical spread of investment across rounds
one and two.  This information was not previously available to Officers.   
Detailed feedback has now been received on both applications from UK Government.  This
included highly positive feedback on the quality of the Lochshore Park project submission. 
Several of the constituent elements of the partnership bid with South Ayrshire Council have
now been progressed through alternative funding sources.  Informed by this, it is proposed
that further consideration be given to the resubmission of the Lochshore Park project
Round 3.  This would be subject to confirmation that Authorities with previously successful
projects will be considered for funding and a detailed assessment of the Fund’s criteria. 
Priorities for a partnership bid with South Ayrshire Council will be considered when further
information is available on Round 3. 
261

Page 262

262

Page 263

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet
Title: North Ayrshire Community Transport Pathfinder 
Purpose: To set out initial proposals for a Community Transport Pathfinder
project in North Ayrshire. 
Recommendation: That Cabinet approves the next steps for the Community
Transport Pathfinder set out at paragraphs 2.11 to 2.14. 
1. Executive Summary 
1.1 The Community Transport Association defines community transport as “providing
flexible and accessible community-led solutions in response to unmet local transport
needs.” There is no fixed model or vehicle used for community transport, however it
can serve a vital role in addressing loneliness and social isolation, and in providing
access to services, training and employment opportunities. 
2.2 The cost and availability of transport within North Ayrshire has been confirmed as a
concern for local communities through recent engagement activity. An allocation of
£0.100m for a community transport pathfinder project was therefore agreed as part of
the Council’s budget setting approach in March 2023. 
1.3 Officers have undertaken initial discussions with Coalfield Community Transport (CCT),
a registered, Ayrshire based community transport charity. CCT are interested in
exploring a potential partnership with North Ayrshire Council to provide community
transport services in our area. As such, the initial proposals are to test demand for
CCT’s community transport services in North Ayrshire. 
1.4 It is recommended that further survey work be undertaken during summer 2023 to
assess travel needs and identify priorities and locations for the community transport
pilot. This will be informed by consultation with communities and stakeholders and take
account of existing public transport opportunities to identify gaps in provision.  This will
ensure that the pilot project meets identified needs within communities. 
1.5 This survey work will be undertaken in parallel with a proposed soft-launch of CCT’s
Dayhopper service in North Ayrshire over the summer period, which would involve CCT
recruiting and registering members in North Ayrshire and provide a series of scenic
tours and shopping excursions. 
1.6 The feedback from the survey work and Dayhopper launch, along with ongoing
engagement through Locality Partnerships, will then inform a set of recommendations
for the wider community transport pilot for Cabinet consideration later this year. 
Agenda Item 12
263

Page 264

2. Background 
2.1 The Community Transport Association defines community transport as “providing
flexible and accessible community-led solutions in response to unmet local transport
needs.” There is no fixed model or vehicle used for community transport, however it
can serve a vital role in addressing loneliness and social isolation, and in providing
access to vital services, training and employment opportunities. Often those who utilise
community transport opportunities are those who are vulnerable or isolated in some
way and it can help them to maintain or develop independence.  Community transport
schemes are usually supported by volunteers within communities and they may provide
services such as hospital transport, vehicles available for lease by local groups, or
community bus schemes.  
2.2 Following budget engagement activity undertaken earlier this year, coupled with mini-
enquiries which took place around various themes associated with the cost of living and
child poverty, transport was again confirmed as an issue for many North Ayrshire
communities. The cost and availability of both public transport and vehicles for hire
meant that vulnerable and more rural residents in particular were limited in their abilities
to get from place to place, and it was reported that this in turn limited their ability to be
involved in community life, get to vital appointments or take up learning and
employment opportunities. 
2.3 The provision of transport at the right time and right cost can provide benefits to
communities by reducing social isolation, enhancing wellbeing, and providing access to
learning and employment opportunities, as well as reducing carbon emissions. 
2.4 Community Transport is an enabler and has an impact across a number of policy areas
including access to health, preventative measures in relation to health and social care
and social isolation and loneliness. Users of community transport can include older
people, people with mental, physical or learning disabilities, people travelling to and
from health services and people living in rural areas. 
2.5  The community transport sector could play a key role in the provision of transport
services in North Ayrshire. Community transport can be used as an alternative to public
services to reach those most isolated in rural locations, or as a partner alongside it. 
2.6 In terms of demand for community transport, within the Garnock Valley locality, the
Locality Partnership worked with Planning Aid Scotland and the Sustaining Places
project to carry out engagement with communities that helped to develop a body of
evidence that demonstrates the changes they would like to see in their area regarding
walking, wheeling, cycling, and public transport. This took place in the second half of
2022 and the report was published in January 2023. Feedback provided noted gaps in
transport provision including lack of affordable, reliable and frequent bus services, and
timetabling gaps between different transport modes. The wider mini-enquiries
undertaken in other localities noted similar feedback. 
2.7 In response to this feedback from communities, and in recognition of the importance of
transport links in helping achieve the aspirations of communities and the Council, North
Ayrshire Council in their 2023/24 budget agreed to an allocation of £0.100m being
earmarked for a community transport pilot. 
264

Page 265

2.8 The pilot will, as far as possible, operate on a cost-recovery basis, in order to provide
access to transport at reasonable cost, while providing opportunities for scalable and
sustainable models for longer-term delivery to be identified. It is envisaged that the pilot
will run for an initial duration of twelve months. 
2.9 Officers have undertaken exploratory discussions with Coalfield Community Transport
(CCT), a registered Ayrshire based community transport charity, operating since 2002.
CCT provide a range of community transport services from their fleet of vehicles and
drivers, including for shopping and excursions. These discussions have led to a set of
recommended next steps for a community transport pilot in North Ayrshire. 
2.10 One of the most important requirements is to better understand the demand for
community transport services. 
2.11 The next steps therefore include the facilitation of surveys in the locality areas to gauge
potential demand, focusing on current gaps in provision.   An in-depth Travel Needs
Analysis is being commissioned by the working group for the Garnock Valley Locality
Partnership, funded by the Community Investment Fund.  This will provide an evidence
base to currently anecdotal transport challenges experienced throughout the Garnock
Valley. The engagement will identify barriers to accessing local transport, identify
patterns and make recommendations to overcome these barriers including, it is
expected, the potential for community transport provision. 
2.12 In addition, a community engagement exercise will be conducted in parallel with the
above study across North Ayrshire.  This will identify local transport needs alongside
the barriers to and gaps in local provision which could be met through community
transport. This will establish the demand for a community transport service and what
form this could take to meet the needs of local communities. External funding
opportunities will also be considered as part of this process to maximise the reach of
the funding and scope of the pilot project. 
2.13 In light of existing community engagement feedback to date, there is a desire to
undertake an early provision exercise. This would involve Coalfield Community
Transport advertising and recruiting members in North Ayrshire and offering their
‘Dayhopper’ services through a series of excursions over the summer period. This
could include scenic tours or day trips, for example to our tourism destinations including
Largs, Arran and Cumbrae, helping to support our local economy and reflecting a
Community Wealth Building approach. A support model would be agreed with Coalfield
Community Transport to help deliver this expanded offer.   
2.14 The survey work and feedback from the Dayhopper soft launch over the summer will
then inform the scoping of wider potential provision, alongside ongoing engagement
with local people through Local Partnerships. Future pilot provision could include, for
example: 
• Door to door minibus transport for home-to-town trips for people who find public
transport difficult to use and for outings to help people stay socially active and
independent. 
• Group minibus transport for local charities, community groups and clubs. 
265

Page 266

2.15 Any future pilot community transport provision would seek to align with Council
priorities alongside affordability within the wider £0.100m funding envelope allocated.
Opportunities to complement that budget with external funding are also being
investigated. 
3. Proposals 
3.1 That Cabinet approves the recommended next steps for the Community Transport
Pathfinder set out at paragraphs 2.11 to 2.14.   
4. Implications/Socio-economic Duty
Financial
4.1 A total of £0.100m was allocated for the community transport pathfinder project as part
of Council budget setting in March 2023. Officers will seek to augment this through
investigation of other external funding opportunities. 
Human Resources 
4.2 None. 
Legal 
4.3 Legal Services have been consulted on the proposals and will continue to advise as
required. 
Equality/Socio-economic 
4.4 The proposal is designed to provide socio-economic benefits through the provision of
low-cost transport particularly to vulnerable people on low incomes and/or who are
experiencing the effects of social isolation. 
Climate Change and Carbon 
4.5 The provision of community transport can help reduce carbon emissions by reducing
reliance on private transport. 
Key Priorities 
4.6 The proposals contribute to the Council’s key priority that North Ayrshire has ‘active
and strong communities’ and is ‘well connected with effective infrastructure’. 
Community Wealth Building 
4.7  The proposal reflects community wealth building principles, for example through a
potential partnership approach with an existing Ayrshire based community transport
provider, and scope to offer excursions to our own tourism destinations to help support
the local economy. 
266

Page 267

5. Consultation 
5.1 Consultation feedback from budget engagement sessions and cost of living mini-
enquiries held earlier in 2023 was used to inform the proposals within this report. It is
proposed that priorities for the pilot project will be identified through community and
stakeholder consultation through the survey work detailed in the report. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact insert officers name, Insert officer’s designation,
on Insert author’s phone number. 
Background Papers
0
267

Page 268

268

Page 269

NORTH AYRSHIRE COUNCIL  
30 May 2023 
Cabinet
Title: Decarbonisation of the Council’s Fleet 
Purpose: To provide an update on the journey to date and further
proposals to decarbonise the Council’s vehicle fleet. 
Recommendation: That Cabinet: 
i. notes the decarbonisation routemap work summarised
within this report; and
ii. agrees the proposals and recommendations set out at
paragraph 2.31 of the report 
1. Executive Summary 
1.1 North Ayrshire Council has declared a climate emergency, and, through its
Environmental Sustainability & Climate Change Strategy, has set an ambitious target
to become net-zero by 2030. The Strategy details multiple work streams to help
achieve these targets, with a key one being Transport & Travel, given that this
represents a significant proportion of area wide emissions. The Council also published
an Electric Vehicle Strategy in 2021 which aims to increase the number of Electric
Vehicles (EVs) used within North Ayrshire. 
1.2 National commitments for reduction of transport emissions have been made, with the
2019-2020 Programme for Government committing to phase out the need for any new
petrol and diesel light commercial vehicles by 2025 and to create the conditions to
phase out the need for all new petrol and diesel vehicles in Scotland’s public sector
fleet by 2030. 
1.3 The Council therefore needs to take action to ensure our fleet meets both national and
local targets. 
1.4 As part of our ambition to achieve net zero carbon emissions by 2030, progress has
already been made in terms of investment in both EVs and charging infrastructure.
However, to assist in the acceleration of more electric and alternative fuelled vehicles
along with the relevant charging infrastructure, external support was commissioned to
review our assets and prepare a detailed implementation plan or ‘routemap’ for
decarbonisation. 
1.5 A summary of the findings is set out within this report, along with recommended
proposals for next steps for Cabinet approval at paragraph 2.33. 
Agenda Item 13
269

Page 270

2. Background 
2.1 The Council’s fleet currently consists of 566 road registered vehicles and plant. The
vehicles are primarily maintained at our in-house workshops at Kilwinning and Lamlash.
All vehicles and plant are operated in accordance with our Fleet Asset Management
Plan. The current fleet includes a range of vehicles intended to serve varying purposes,
with some more suited to switching from conventional fuels to alternative sources than
others. 
2.2 A total of 397 vehicles have been identified as being immediately suitable to be
replaced by EV alternatives. This excludes 169 vehicles (heavy fleet and plant) which
do not currently have a cost-effective solution however options for this category of
vehicles have still been considered within the study.   
2.3 Progress has already been made in relation to acquisition of electric vehicles and we
currently operate 31 EVs, which equates to almost 10% of the 397 vehicles noted
above. 
2.4 Much of the Council's fleet is stored overnight on Council-owned premises and
therefore any attempts to electrify these vehicles will require appropriate charging
infrastructure. As of May 2023, the Council has installed 29 workplace chargers (65
sockets) to support the decarbonisation of our fleet vehicles. 
2.5 A key part of our decarbonisation journey is to follow a hierarchy approach as follows: 
Avoid the need to travel 
2.6 The Council’s fleet is generally engaged in essential service delivery with a need to
travel. However, there are opportunities to reduce travel demand, including through
digital service delivery options and improved journey planning for essential travel. 
2.7 Our decarbonisation routemap therefore includes a recommendation to consider the
opportunities available from the Council’s Digital Strategy, and also to work with high
mileage services to review telematics data and understand if there is any potential to
further review the journey planning approach to reduce mileage requirements and
associated fuel, maintenance and repair costs. 
2.8 In terms of staff business travel, we continue to promote sustainable travel and
employees are reminded to select the best option to meet their business travel needs.
The sustainable travel hierarchy encourages staff to choose the most appropriate
solution with the lowest CO2 impact. 
3. Switch to Low
Carbon
Alternative
2. Rationalise use of
current fleet (increase
utilisation/re-
allocation/downsize)
1. Avoid the need to travel
270

Page 271

Rationalise the current fleet 
2.9 Fleet rationalisation is the process of reducing the size of the fleet to ensure that each
vehicle is used as efficiently as possible. This involves examining the usage of each
vehicle and removing any vehicles that are excess to requirements, reallocating
vehicles within the fleet, and/or downsizing vehicles. This can provide cost (both
revenue and capital) and carbon savings as vehicles are optimised and less vehicles
overall need to be leased/purchased and maintained.   
2.10 The Council’s staff pool car scheme was successfully re-launched during 2022/23 with
an aim to reduce carbon emissions and expenditure associated with staff business
travel. Over 1,500 members of staff have signed up to the scheme, with access to 11
low emission vehicles and four EVs across seven Council office locations. We will
switch over the 11 low emission vehicles to EVs on a phased basis, following further
analysis of utilisation patterns and investment in charging infrastructure. 
Switch to low carbon alternatives 
2.11 Creating a 100% zero-emission fleet will likely require the replacement of our current
vehicles with a mixture of different technologies. Currently most zero emission vehicles
are battery electric vehicles but there are also hydrogen options available which could
have particular applicability to our heavier fleet. 
2.12 Of our 566 fleet vehicles, 397 vehicles have realistic EV replacements options currently
available (passenger cars, light commercial vehicles (LCVs) and buses). A breakdown
of the fleet (as of May 2023) is as follows: 
Table 1: Fleet Baseline 
*Categories that total the 397 vehicles noted earlier in the report are highlighted in bold. 
2.13 The fleet currently operates 31 leased EVs with a further 25 vehicles purchased and
due for delivery imminently. 
2.14 The majority of the current EV fleet are leased; this was primarily due to these being
funded through the national Switched on Fleet programme. However, where capital
finance is available to support outright purchase, this is the preference, balanced
against the benefits of evolving technology, for the following reasons: 
• Flexibility in respect of use and length of ownership
• Avoidance of end of lease costs, particularly in respect of annual mileage and return
condition
• Avoidance of early termination penalties should service reviews identify the
requirement for a different type of vehicle.
Vehicle Type* Volume % of Fleet
LCV 291 52.8%
Passenger Car 80 14.0%
HGV 74 13.0%
Minibus 18 3.1%
Compact Sweeper 12 2.1%
Bus 8 1.4%
Road Registered Plant 83 14.6%
Total 566 100%
271

Page 272

• Negates premium lease payments to compensate for low residual values associated
with specialist vehicles with limited second-hand opportunities
• Reduces pressure on revenue budgets 
2.15 It is estimated that the total capital funding required to replace all 397 vehicles currently
suitable for low emissions alternatives is £15.85m (which includes both vehicle
replacement and charging infrastructure), based on today’s prices. This investment
figure excludes the 169 vehicles which do not currently have a cost-effective solution;
however, these units will still require to be replaced with traditional units over the next
eight years. They have been included within the replacement table below at a cost
£12.13m however this is only based on their current combustion replacement costs. 
2.16 Our forecast costs for vehicle replacements based on 2030 target date to decarbonise
the 397-vehicle fleet currently suitable for switchover are as follows: 
Year
23/24
£m
24/25
£m
25/26
£m
26/27
£m
27/28
£m
28/29
£m
29/30
£m
30/31
£m
Total
£m
Vehicle
Replacement
Capital
£3.360 £1.020 £2.000 £2.980 £2.000 £2.000 £2.000  £2.000  £17.360
Estimated
Budget
Required
£3.260 £2.840 £3.660 £4.930 £3.620 £3.440 £3.350  £2.880  £27.980 
2.17 The profiling of the above illustration is based on a decarbonisation model undertaken
which considered remaining lifespan of current combustion vehicles, the need for a
managed approach, and the lead-in time for vehicle charging investment (both work
based and home charging). 
2.18 As the table demonstrates, the current capital programme budget to the target date of
2030 is significantly less than the budget available due to the costs of EV vehicles
(often double the cost of combustion counterparts) and the need for charging
infrastructure. 
2.19 It is therefore recognised that the ability of the Council to decarbonise the fleet in the
short to medium term will be very challenging due to affordability constraints and other
delivery challenges. Options to address the current £10.620m gap will need to be
considered as part of the next refresh of the capital programme. However, the
estimated figures may reduce, including in response to ongoing transformation
projects, service reviews and a reduction in the cost of EVs themselves. Research
suggests that electric cars and vans should be cheaper to make than petrol or diesel
vehicles by 2027, with some segments achieving price parity from 2026. 
2.20 It should also be noted that previously allocated additional capital of £2.500m in
support of decarbonising the fleet will aid the introduction of around 65 EVs and
supporting charging infrastructure by end of March 2024.   
Charging Infrastructure 
2.21 In parallel with zero emission vehicles adoption, the Council must plan for, and install,
suitable charging infrastructure to support our expanding electrified fleet. This will require
a mixture of workplace and home-based charging, as some vehicles are stored on
Council premises overnight, and others are taken home. 
2.22 As of May 2023, the Council have installed 29 dedicated workplace chargers (65
sockets) to support the decarbonisation of our fleet vehicles. These have been funded
through the Switched on Fleets programme which is solely used in support of charge
point infrastructure for fleet vehicles. 272

Page 273

2.23 The EV Working Group continues to review the Council’s non-domestic buildings and
fleet mileage data to identify further opportunities to install workplace charge points,
with cognisance taken of site constraints (e.g. parking, grid capacity) and vehicle
requirements (travel patterns, daily mileage, time available to charge). 
Heavy Duty Vehicles 
2.24 The UK Government Decarbonising Transport plan for Heavy Duty Vehicles (HDV) details
that all sales of new medium sized trucks (up to and including 26 tonnes) to be zero
emissions from 2035. with the heaviest (above 26 tonnes) zero emissions by 2040. 
2.25 There is a growing number of viable zero emission alternatives, particularly for Refuse
Collection Vehicles (RCVs), however at present they do have high upfront costs (up to
three times the cost of a diesel equivalent and with limited range) and it is likely that
costs will reduce and more viable zero emission replacements options will emerge. 
2.26 Hydrogen is likely to be a key fuel source in a net zero future. Fuel cell electric vehicles
(FCEVs) use hydrogen to produce electricity, these offer efficient and quiet transport
with no exhaust emissions other than water. If fuelled by hydrogen produced from
renewable sources, they are a true zero emission solution. 
2.27 It is important that, given climate change targets and aspirations, that we investigate
options for our heavier fleet at an early stage to best position ourselves to capitalise on
early adoption of alternative fuels. 
2.28 In support of decarbonising the existing heavy duty vehicle (HDV) fleet, an interim
approach could be the use of hydrotreated vegetable oil (HVO). This can offer a
potential short to medium term option for our HDV fleet where ready electric
replacements are not available or would be cost prohibitive. HVO can deliver up to a
90% reduction in carbon emissions. The following table details the potential impact on
our RCV fleet from introducing HVO fuel: 
Table 2: Impact on RCV Fleet from using HVO 
2.29 However, the latest HVO pricing has shown that the cost per litre is currently around 
40% more expensive than diesel. 
2.30 From 2030 onwards, the Council will need to consider the procurement of zero
emission HDVs. These vehicles typically have the longest life cycles and have the
highest potential for CO2 savings. Were we have HDVs that must be replaced in the
short term but have no zero emission replacement options, we will continue to specify
that these are equipped with the latest Euro 6 diesel engines with the option for HVO
conversion.   
Vehicle
Approx.
Annual fuel
usage 
Approx.
annual CO2
(conversion -
2.60240) 
Potential annual 
CO2 emissions 
using HVO (90%)
Potential
annual CO2
reduction
(90%)
1 x RCV 9,600ltrs 25 tonnes 2.5 tonnes 22.5 tonnes
36 x RCV’s 345,600ltrs 900 tonnes 90 tonnes 810 tonnes
273

Page 274

2.31 In summary, the routemap study undertaken has identified the following
recommendations in support of decarbonising the fleet by 2030: 
(i) The purchase of new passenger and Light Commercial Vehicles (LCVs) will be
zero emission vehicles only, two years ahead of the 2025 target to phase out
acquisition of petrol and diesel versions of such vehicles by public bodies.
(ii) Utilise existing budget provision to acquire c.65 EV passenger and LCV vehicles
by March 2024 (including 25 already on order)
(iii) Progress with preparatory work for implementation of further passenger and
LCV EV vehicles, including a wide communications programme with employees
who use Council vehicles.
(iv) Lobby Scottish Government through existing networks (including COSLA,
SOLACE and the Sustainable Scotland Network) to outline the financial
requirements associated with decarbonisation requirements and additional
financial support required.
(v) Agree to review the capital programme provision for financial year 2024/25
onwards to consider the current £10.620m gap (which excludes heavier fleet
decarbonisation costs) to further support decarbonisation requirements.
(vi) To undertake further research, including with the Hydrogen Accelerator Project,
to identify solutions for the Council’s heavier fleet, incorporating potential
consideration of a hydrogen fuel pilot to understand potential and inform future
deployment strategy for heavier vehicles and plant, consideration of HVO
(hydrotreated vegetable oil) as a potential short to medium term option for
existing heavy fleet combustion vehicles, as well as future electricity generation
proposals at Shewalton and potential links with charging requirements at that
depot location for EV related heavy fleet solutions. Opportunities for external
grant funding will also be investigated.
(vii) Review the potential emerging from our Digital Strategy and work with services
including Waste, Care at Home and Building Services, to understand any
opportunities for fleet reduction and/or route mapping through use of our
telematics data.
(viii) Develop the existing EV working group into a fleet decarbonisation group, which
will report to our already established Climate Change Steering Group.
(ix) Share the findings of our decarbonisation routemap with CPP partners to identify
any potential synergies including in relation to vehicle charging infrastructure.
(x) Review the forthcoming Ayrshire EVCI pathfinder project, which is anticipated to
deliver over 300 new EV charging points across Ayrshire, for any synergies with
the charging requirements of our further electrified fleet.
(xi) Explore the potential for an EV salary sacrifice scheme with the Head of People
and develop a supporting communication strategy for staff to aid the wider
uptake of EVs.
(xii) Continue in the development of the Council’s mechanics by supporting
attendance of training on electric/hybrid vehicle systems repair and replacement,
which is accredited at IMI level 3.
(xiii) Create a programme management role, which is essential to help manage the
ongoing implementation and development of the decarbonisation project. The
activities for this role will include monitoring and implementation of the
decarbonisation plan, co-ordination of activity across the relevant departments
within the Council and reporting on progress. 
(xiv) Reflect the above commitments in the forthcoming update to the Council’s
Environmental Sustainability & Climate Change Strategy. 
274

Page 275

3. Proposals 
3.1 It is proposed that Cabinet (i) notes the decarbonisation routemap work summarised
within this report; and (ii) agrees to the recommendations and proposals set out at
paragraph 2.31 above.   
4. Implications/Socio-economic Duty 
Financial 
4.1 The Council is already investing significantly in its journey to net zero, taking action on
climate change and addressing the Climate Emergency. An initial £2.500 million has
been allocated in support of our current fleet decarbonisation programme. The ability of
the Council to fully decarbonise the fleet in the short to medium term, however, will be
very challenging due to affordability constraints. Options to address the current
£10.620m gap will need to be considered as part of the next refresh of the capital
programme. 
Human Resources 
4.2 The creation of a programme management role is essential to help manage the
ongoing implementation and development of the decarbonisation project. Funding for
this resource (c.£175k total over three years) will be provided from the Council’s
Change and Service Redesign Fund. 
Legal 
4.3 There are no implications arising from the report. 
Equality/Socio-economic 
4.4 There are no implications arising from the report. 
Climate Change and Carbon 
4.5 The proposals within the report aim to: 
• make a positive contribution to national carbon reduction targets
• contribute to the Council’s commitment to be carbon neutral by 2030
• contribute to the delivery of the EV Strategy 2021-2025 and the development of a
network of strategically located EV charge points across North Ayrshire
• contribute to the delivery of the North Ayrshire Environmental Sustainability &
Climate Change Strategy (ESCCS) Transport and Travel workstream. 
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
priorities: 
• A sustainable environment; and 
• People enjoy good life-long health and wellbeing 
275

Page 276

Community Wealth Building 
4.7 Community wealth building benefits will be considered through the procurement of
replacement EVs as part of the decarbonisation programme. 
5. Consultation 
5.1 Consultation and stakeholder engagement with frontline services has taken place
throughout the review, including by engagement with the Council’s EV Working Group
along with service specific surveys and questionnaires. The development of the existing
EV working group into a fleet decarbonisation group will help support the transition to
alternative fuelled vehicles. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact David Hammond, Head of Sustainability, Corporate
Property & Transport, on 01294 324514. 
Background Papers
0
276

Page 277

NORTH AYRSHIRE COUNCIL 
30 May 2023 
Cabinet
Title:
Ardrossan Harbour Redevelopment Procurement
Agreement   
Purpose: To seek Cabinet’s agreement to enter a procurement
agreement with Ardrossan Harbour Company Limited to allow
the Ardrossan Harbour Redevelopment tender process to
proceed.   
Recommendation: That Cabinet agrees to enter into a procurement co-operation
agreement with the Ardrossan Harbour Company Limited
[AHCL] to enable Peel Ports Group to lead a procurement
process to secure contractors to undertake the proposed
redevelopment works at Ardrossan Harbour. 
1. Executive Summary 
1.1 The Council together with the Ardrossan community successfully campaigned to retain
Ardrossan as the mainland port for the Arran and Kintyre ferry services through the
Save our Ferry Campaign in late 2016/early 2017.  Ministers confirmed that the
services would continue to operate from Ardrossan in April 2017. Since this time, and
under the direction of the Ministerial Taskforce established to oversee the project;
partners have worked to develop design proposals for all aspects of the project to their
current state, which allows project partners to proceed with procurement activity for the
project. 
1.2 In terms of advancing the programme of works, partners have agreed in principle that
Ardrossan Harbour Company Limited as a subsidiary of Peel Ports Group, in their role
as Project Managers, will commence the procurement process to obtain tenders for the
project and ultimately enable partners to agree a funding package for the project and
thereafter enter into a contract to execute a design and build contract for marine and
landside works, as a single works package. This report seeks approval to enable the
Council to enter a procurement agreement with AHCL/PPG to provide a framework for
protecting the Council’s interest through the procurement process for the project and
allowing partners to proceed to obtain market cost for the project. 
2. Background 
2.1 The Council meeting of November 2016 agreed to take all necessary steps to retain the
lifeline service at Ardrossan.  This led to the submission of a technical case to justify
the advantages of retaining Ardrossan as the mainland port for the services in
December 2016, and the submission of a financial case setting out proposals for
Agenda Item 14
277

Page 278

investment in the harbour infrastructure by the Council and the ports owners, Peel
Ports Group (PPG) in January 2017 and proposals for a lease agreement between the
Council and AHCL (PPG) over land at Ardrossan Harbour. At that time the package of
works involved only a limited upgrade to the existing marine infrastructure specification.
2.2 Following confirmation by Scottish Government of Ardrossan being the mainland port
for the Brodick and Campbeltown ferry services in April 2017, further modelling and
simulations of the ferry utilising the harbour led to the conclusion that additional works
to the marine infrastructure at the harbour would require to be undertaken to deliver a
more resilient harbour service in the long term and accordingly designs have been co-
developed and agreed by partners for  a new terminal building, marshalling areas,
access / public transport; and active travel / car parking. 
2.3 All parties have agreed current project designs through the Ardrossan Taskforce, as a
basis for proceeding to procurement to obtain tenders for a design and build contractor
to complete technical design for the marine and landside components of the project
and to lead construction activity at an agreed price. A Procurement Co-operation
Agreement has been developed to outline all procurement arrangements for the
appointment of a design and build contractor to allow AHCL (PPG) to act on the
Council’s behalf and lead procurement activity to secure a market price and contractor
for the works. Subject to approval of this paper, the agreement will confirm governance
and general arrangements for the procurement process from invitation to tender, to bid
selection, development of lease terms up to award of contract. This will be set out in a
gateway model, whereby agreement of all parties is required to proceed through each
stage of the process. As such, it should be noted that entering the Procurement Co-
operation Agreement and proceeding with procurement activity does not commit the
Council to proceeding to contract award.  
2.4 The Procurement Co-operation Agreement will reflect the current project plan and
reflects the Ministerial Taskforce objectives of seeking to commence the procurement
process through an Invitation to Tender being issued to market in June 2023, with bids
for the contract being submitted by December 2023 for consideration of partners to
agree the preferred bidder, the funding package for the works and to set contract terms
for appointment. Construction completion is anticipated in late 2025, based on the
current project plan. 
2.5 It is considered that proceeding to procurement is a necessary critical path step in the
project because it will allow the project development process to proceed, thereby
offsetting potentially substantial service delivery and cost risks associated with delay,
by allowing project partners to understand the true project cost, to be able to agree a
funding package for the project, appoint a contractor team and commence technical
design and construction works.
2.6 Given that the marine works will involve significant disruption to the harbour
infrastructure, the closure of the Arran berth for a 24-month period during the
construction phase will be required.  To allow the works to proceed effectively, the
service is to be relocated temporarily to Troon, until the Ardrossan works are complete.
The proposed approach set out in this report seeks to minimise service disruption by
limiting delay to the project development process and thereby minimising the period
during which the ferry service will be temporarily relocated to Troon as well as limit
impact of construction cost inflation.      
278

Page 279

3. Proposals 
3.1  That Cabinet agrees to enter into a procurement co-operation agreement with the
Ardrossan Harbour Company Limited [AHCL] to enable Peel Ports Group to lead a
procurement process to secure contractors to undertake the proposed redevelopment
works at Ardrossan Harbour. 
4. Implications/Socio-economic Duty
Financial
4.1 This report recommends expediting the project development process towards
procurement in order that a fixed cost for the project is understood and that will enable
project partners to agree a financial package to fund the project cost. Delay to this
process will potentially increase the length of time to completion of works and therefore,
that the ferry service operates from Troon and may also increase project cost arising
from future construction cost inflation.
4.2  The investment proposed by the Council to support landside investment components of
the contract will be facilitated by a lease agreement with the owner of the landside
infrastructure, Peel Ports Group.  Detailed lease terms are in development. This
agreement will be mirrored by a lease agreement to CMAL at an annual commercial
rate decided by our Estates team in consultation with and external surveyor. In addition
to this NAC will seek to raise revenue from the operation of the car park facility to be
constructed as part of the landside works.
4.3 In summary, it is important to note that the level of NAC contribution to this project will
only be known when the tender process is complete and when the project partners
agree the financial package. Due to the ongoing impact of construction inflation, there
is a risk that the required NAC contribution will exceed current available resources.
Approval for any additional financial contribution will therefore have to be considered
within the context of affordability within the overall capital programme. 
Human Resources 
4.4 There are no Human Resource implications arising from the report. 
Legal 
4.5 The proposed works to the harbour will be facilitated by the Council entering into a
“pepper corn” lease agreement for the land with the Ardrossan Harbour Company
Limited [AHCL] to enable Peel Ports Group, the owners. A sub lease will also be
entered into between the Council and CMAL (or their successors) for the proposed new
terminal building at a commercial rate to help finance the investment in the build over
the expected lifespan of the building (25 years).  
4.6 Legal advice has been taken on the subsidy control implications of public investment in
the harbour area.  It is considered that subsidy control issues do not arise given that the
Council is investing on commercial terms, meaning that no undertaking benefits from the
measure.  Peel does not benefit from granting the pepper corn lease.  CMAL does not
benefit as it will be paying a market rent. Business users of the terminal and car park will
similarly paying market terms of the use of the those facilities.   
279

Page 280

Equality/Socio-economic 
4.7 The proposals will form part of a major capital investment programme in Ardrossan, with
positive socio-economic impacts for the town, and deliver the benefits articulated in the
case for retaining the service at Ardrossan. 
Climate Change and Carbon 
4.8 The procurement process will ensure that bidders set out the impact of their bids from a
climate change perspective and this will inform bid selection. 
Key Priorities 
4.9 The proposed investment will support the Council Plan themes of: 
• Growing our economy, increasing employment, and regenerating towns  
• Working together to develop stronger communities. 
• Protecting and enhancing the environment for future generations 
Community Wealth Building 
4.10 Local benefits in terms of employment and skills will be sought through the
procurement process for what are major capital works.  In addition, the proposed lease
agreements illustrate how the use of land and commercial income can be used to
secure investment for community benefit. 
5. Consultation 
5.1 The project is being led by the Ardrossan Harbour Taskforce, co-ordinated by
Transport Scotland and with membership including North Ayrshire Council, Peel Ports
Group, Caledonian Maritime Assets Ltd (CMAL), Cal Mac Ferries Ltd  (CalMac), and
the Arran Ferry Committee. 
5.2 Public Consultation has been undertaken during the design process for the landside
infrastructure with the local community in both Arran and Ardrossan.  This consultation
has also involved Caledonian Maritime Assets Ltd, CalMac Ferries Ltd, Peel Ports
Group, Scotrail, local landowners, harbour tenants and other relevant
partners/interested bodies. 
5.3 A consultation is ongoing in relation to the service providers/users given the impact of
the works on service reliability and the temporary use of an alternative port at Troon
and being carried out by partners TS, CMAL and CalMac. Proceeding to tender stage
will inform future planning for the impact of the construction works on the local
community as the full impact of the works will be determined by the design and build
process. 
280

Page 281

5.4 Project updates will be provided through project specific pages on the Council and
Transport Scotland websites. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Bruce McClure, Senior Manager (Growth &
Investment), 01294 324176 or brucemcclure@north-ayrshire.gov.uk and Neale
McIlvanney (Interim Head of Service – Growth, Investment and Employability)
nealemcilvanney@north-ayrshire.gov.uk 
Background Papers
None. 
281

Page 282

282

Page 283

NORTH AYRSHIRE COUNCIL  
30 May 2023 
Cabinet
Title: UK Shared Prosperity Fund – Communities and Place Fund
Purpose: To update Cabinet on the UK Shared Prosperity Fund (SPF) and
seek approval of the proposed approach to the Communities and
Place Grant Fund. 
Recommendation: That Cabinet: 
a) Notes the update on the UK Shared Prosperity Fund; and
b) Approves the proposed approach to the Communities & Place
Grant fund provided at Appendix 1. 
1. Executive Summary 
1.1  The UK Shared Prosperity Fund is part of the UK Government’s Levelling Up
Agenda.  This will provide £2.6bn of funding across the UK between April 2022 and
March 2025.  This replaces European Union funding that has historically supported
employability and skills projects and local business activity in North Ayrshire.  The
overarching objective of the Fund is to build pride in place and increase life chances,
underpinned by four levelling up objectives and three investment priorities. 
1.2 North Ayrshire Council’s Investment Plan for the £6.2m allocation was approved by
Cabinet in August 2022 and subsequently by the UK Government in December 2022. 
This included the development of a competitive grant scheme and participatory
budgeting programme for communities under the Communities and Place investment
priority. 
1.3 The proposed approach to the Communities and Place Fund has been developed in
consultation with relevant stakeholders and community representatives. It seeks to
leverage community capacity to meet local needs in line with the Shared Prosperity
Fund objectives. This report provides an update on activity to date and seeks
approval for the proposed approach to the Communities and Place Fund provided at
Appendix 1. 
2. Background 
2.1 The UK Shared Prosperity Fund (SPF) is part of the UK Government’s Levelling Up
Agenda.  The Fund is delivered centrally by the Department of Levelling Up, Housing
and Communities (DLUHC) with awards made directly to local authorities.  It is a
replacement for the European Social Fund (ESF) and European Regional
Development Fund (ERDF) funding. In North Ayrshire this has funded employability
Agenda Item 15
283

Page 284

and skills and business support services, alongside regeneration project delivery. 
2.2 The overarching objective of the SPF is to build pride in place and increase life
chances.  The fund has three investment priorities in addition to an earmarked
amount set aside to deliver adult numeracy activities entitled Multiply: 
• Communities and Place;
• Supporting Local Business; and
• People and Skills. 
2.3 The SPF allocation for North Ayrshire over the three-year programme is £6,200,649. 
This comprises a £5,129,864 core SPF allocation and a £1,070,795 Multiply Fund
allocation.  The annual allocations are detailed in the table below: 
Allocation 2022/23 (£)  2023/24 (£)  2024/25 (£)  Total (£) 
Core SPF  622,555  1,245,110  3,262,189  5,129,854 
Multiply  323,729  373,533  373,533  1,070,795 
Total Allocation (£) 946,284  1,618,643  3,635,722  6,200,649 
2.4 Cabinet approved the North Ayrshire SPF Investment Plan, setting out how we
intend to utilise and deploy the fund, in August 2022. This was subsequently agreed
by the DLUHC in December 2022.  A minimum amount of approximately 15% of the
allocation must be allocated to capital expenditure and a total of 4% is available
towards the administrative costs of running the programme.   
2.5 The supporting Local Business and People and Skills priorities are being managed
as follow-on programmes to the current EU supported Business Support, including
Business Gateway, and Employability services offered by the Council.  The Multiply
adult numeracy service is being delivered in partnership with Community Housing
Advocacy Project (CHAP) and Ayrshire College to support the development of adult
numeracy across North Ayrshire.   
2.6 The Communities and Place investment priority aims to enable places to invest to
restore their community spaces and relationships and create the foundations for
economic development at the neighbourhood level.  Its objectives are to: 
• Strengthen the social fabric and foster a sense of local pride and belonging,
through investment in activities that enhance physical, cultural and social ties and
access to amenities.
• Build resilient, healthy and safe neighbourhoods, through investment in quality
places that people want to live, work, play and learn in, through targeted
improvements to the built and natural environment and innovative approaches to
crime prevention. 
2.7 This investment priority received a £1.52m allocation, which equates to
approximately 21% of the overall allocation.  The capital and revenue breakdowns for
this are detailed in the table below.  This includes the administration and
management costs for the overall SPF Programme over the three years: 
284

Page 285

Funding
Period
Communities and
Place allocation (£)
Capital (£) Revenue (£) Admin (£)
2022/23 221,995 98,414 96,033 27,548
2023/24 341,026 202,330 31,003 107,693
2024/25 961,794 650,794 200,076 110,924
Total (£) 1,524,815 951,538 327,737 245,540 
2.8 The approach to the Communities and Place investment priority outlined in the
Investment Plan aims to support the delivery of community projects through a
competitive grant fund and participatory budgeting programme.  It also aims to
support smaller scale strategic Council projects that meet the aims and objectives of
SPF through a capital and revenue allocation.  The latter will support Council-led
projects that meet the aims and objectives of SPF and contribute to the delivery of
strategic goals.  It is intended that this approach will be referred to as the
Communities and Place Fund going forward. 
2.9 Due to the delayed start to the overall SPF programme, UK Government has
confirmed that Year 1 funds can be carried over into Year 2.  The Cabinet approval
provided delegated authority to the Executive Director (Place) to agree changes to
the funding allocations in consultation with the Portfolio Lead as required.  This is,
however, subject to the approval of credible plans indicating how carry forward will
be utilised.  Credible plans for carry forward have been submitted as part of the
2022/23 UKSPF End Of Year Report, which was submitted on 2 May 2023. There
will be no further carry forward permitted of Year 1 funding, which must be disbursed
fully and promptly. 
2.10 Appendix 1 outlines the proposed approach to the competitive grant fund,
participatory budgeting and Council led projects programme under the investment
priority.  This includes the approach to redistribute the balance of Year 1 funding
which has informed the credible plan submitted to UK Government.  This has been
informed by consultation with Elected Members, Connected Communities,
community organisations and community stakeholders. 
2.11 The approach aims to provide a flexible and inclusive source of funding for
communities to meet local need and achieve local outcomes across a broad range of
activities. This seeks to complement the range of external funding opportunities
currently available and to support community-led projects.  The proposed approach
to engagement with Locality Partnerships, Elected Members and community
organisations on the Fund is also detailed in Appendix 1. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the update on the UK Shared Prosperity Fund; and
b) Approves the proposed approach to the Communities and Place Fund provided
at Appendix 1. 
285

Page 286

4. Implications/Socio-economic Duty 
Financial
4.1 The cost of delivering the Investment Plan and overall SPF Programme including the
Programme Manager and Monitoring and Compliance roles will be funded by the
SPF allocation.  These are set out at Section 2.3 and 2.7 above. 
Human Resources 
4.2 The SPF Programme will be managed by the Programme Manager, with monitoring
and compliance undertaken by the Claims and Compliance Officer.  Both roles will
be funded by the SPF allocation. 
Legal 
4.3 The approved Investment Plan was informed by advice from Legal Services and
has informed the development of the Communities and Place Fund guidance and
application documentation.  The final documentation will be reviewed by Legal
Services prior to launch to ensure compliance. 
Equality/Socio-economic 
4.4 The approved Investment Plan aims to deliver on social and economic outcomes
and was subject to the following impact assessments: Equality and Children’s
Rights; Islands and Fairer Scotland Duty.  The Communities and Place Grant Fund
aims to provide a flexible and inclusive source of funding for communities to meet
local need and achieve local outcomes across a broad range of activities. The
application and assessment process ensures alignment with the Fairer Scotland
Duty and Council priorities, to address socio-economic inequality and embed a
Community Wealth Building approach. 
Climate Change and Carbon 
4.5 The approved Investment Plan aims to improve the North Ayrshire and Ayrshire
economies in accordance with net zero ambitions.  This links with the ambitions of
the Environmental Sustainability and Climate Change Strategy (ESCCS) and the
ambition for a fairer, greener and more inclusive economy as set out in the Council’s
Economic Recovery and Renewal Approach. A key aspiration of the Communities
and Place theme is to deliver measures to support net zero and energy efficiency
and enhance the natural environment. Several interventions specified by the Fund
can deliver on these aims. 
Key Priorities 
4.6 The implementation of the SPF Investment Plan and Communities and Place Fund
will contribute to achieving the Council Plan priority outcomes and will contribute to
the ambitions for active and strong communities, and a sustainable, vibrant,
welcoming and attractive environment. 
286

Page 287

Community Wealth Building 
4.7 The approved Investment Plan was informed by the Community Wealth Building
strategy with the SPF themes cross referenced with the five pillars and respective
related Regeneration Delivery Plan, Economic Recovery and Renewal Plan and
Island Plans. The Investment Plan approach was considered by the CWB Expert
Panel and advice provided on embedding CWB into the proposals. 
4.8 The approach proposed for the Communities and Place Fund ensures investment is
targeted locally to add value to and enhance existing activities across the funding
landscape. It empowers local communities to deliver on their own priorities and
encourages added capacity through partnership working, creating a resilient and
robust local delivery ecosystem. 
5. Consultation 
5.1 The approved Investment Plan was developed by a cross-service team of officers
through a short life steering group with representation from Economic Policy,
Business Support, Employability, Regeneration, Connected Communities, Health &
Social Care Partnership, Procurement, Finance, Legal Services and HR. 
5.2 The Communities and Place Fund proposal has been developed in consultation with
Elected Members (at the Policy Advisory Panel), Connected Communities,
community organisations and community stakeholder representatives as outlined in
Appendix One. This has been further tested through consultation with The Ayrshire
Community Trust and Arran Council for Voluntary Services. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Shona McAllister, Programme Manager – Shared
Prosperity Fund,
on 07773963545. 
Background Papers 
Cabinet Report, UK Shared Prosperity Fund, 23 August 2022
Policy Advisory Panel, UK Shared Prosperity Fund – Communities and Place, 18 April
2023  
287

Page 288

Appendix One
Communities and Place Fund 
The UKSPF Communities and Place investment priority aims to enable places to invest in
restoring their community spaces and relationships and create the foundations for
economic development at the neighbourhood level.  Its objectives are to: 
• Strengthen the social fabric and foster a sense of local pride and belonging, through
investment in activities that enhance physical, cultural and social ties and access to
amenities.
• Build resilient, healthy and safe neighbourhoods, through investment in quality places
that people want to live, work, play and learn in, through targeted improvements to the
built and natural environment, and innovative approaches to crime prevention. 
The investment priority requires Councils to be mindful of how interventions under this
priority align with the existing funding streams received from the Scottish Government
including the Place Based Investment Programme.  The alignment with Scotland’s National
Strategy for Economic Transformation (NSET) also requires to be considered to ensure that
they contribute to a fairer and more equal society, new market opportunities and productive
businesses and regions. 
Thirteen interventions are identified under the investment priority.  The approved North
Ayrshire Investment Plan supports delivery of projects across the range of interventions.  A
series of outcomes and outputs are identified under each intervention and require to be
reported on annually: 
S1 Place based investments for regeneration and town centre improvements
S2 Support and improvement of community assets and infrastructure projects
S3 Improvements to the natural environment and green and open space 
S4 Design and management of the built and landscaped environment.
S5 Support for sport, arts, cultural, heritage and creative activities, projects and
facilities and institutions.
S6 Funding for active travel enhancements and other small scale strategic transport
projects.
S7 Funding for the development and promotion of wider campaigns which encourage
people to visit and explore the local area.
S8 Funding for impactful volunteering and/or social action projects to develop social
and human capital in local places.
S9 Investment in capacity building, resilience and infrastructure support for local civil
society and community groups.
S10 Community measures to reduce the cost of living, including through measures to
improve energy efficiency, and combat fuel poverty and climate change
S11 Funding to support relevant feasibility studies.
S12 Investment and support for digital infrastructure for local community facilities
S13 Support for linking communities together and with employment opportunities with
a focus on decarbonisation. 
The approved Investment Plan outlined that the Communities and Place investment priority
would be comprised of a: 
• Participatory Budgeting programme;
• Competitive grant scheme for communities; and
288

Page 289

• Funding allocation for Council projects. 
The initial breakdown of the allocation was as follows.  This includes the administration and
management costs for the overall SPF Programme over the three years: 
Activity Year 1 Year 2 Year 3 Total
Participatory Budgeting 0   31,003  31,003  62,006 
Competitive Grants -
revenue 0 0 100,000  100,000 
Competitive Grants - capital 0 102,330  500,000  602,330 
Council Projects - revenue 96,658 0 69,073  165,731 
Council Projects - capital  98,414  100,000  150,794  349,208 
Administration 26,923 107,693 110,924 245,540
Total 1,524,815 
Due to the delayed start to the overall programme, UK Government has confirmed that
Year 1 funds can be carried over into Year 2.  Thereafter there will be no further carry
forward permitted of Year 1 funding, which must be disbursed fully and promptly.  The
Cabinet approval provided delegated authority to the Executive Director (Place) to agree
changes to the funding allocations in consultation with the Portfolio Lead as required.  This
is however subject to UK Government approval of credible plans indicating how carry
forward will be utilised.  The table below outlines the proposed approach to the reallocation
of the funds.  It should be noted that administration costs were slightly higher than
anticipated but remain within the 4% limit. 
Activity Year 1 Year 2 Year 3 Total
Participatory Budgeting 0   31,003  31,003  62,006 
Competitive Grants -
revenue 0 58,000 100,000  158,000 
Competitive Grants - capital 0 102,330  500,000  602,330 
Council projects - revenue
Carry
forward 38,033 69,073  107,106
Council projects - capital 
Carry
forward 198,414 150,794  349,208
Administration 27,548 107,693 110,924 246,165
Total 1,524,815 
The following summarises the proposed approach to each of these allocations under the
Communities and Place Fund. 
Participatory Budgeting 
In line with the Council’s commitment to Participatory Budgeting (PB), 1% of the total SPF
award, amounting to £62,006, has been allocated for PB across years 2 and 3 of the
programme. Projects will require to be aligned to the Communities and Place the thirteen
interventions and contribute to the delivery of the associated outcomes and outputs. 
This element of the fund will be managed by Connected Communities in accordance with
their ongoing community empowerment ambition to provide local ownership of the fund and
give people a say on how the fund is spent in their localities.  This will also be undertaken in
accordance with good practice guidelines outlined in the Participatory Budgeting Toolkit
produced by North, South and East Ayrshire and the Convention of Scottish Local
289

Page 290

Authorities (COSLA) PB Team.   
Competitive Grants 
The approved Investment Plan identified that a significant proportion of the Communities
and Place allocation would be utilised to develop a competitive grant scheme.  This will
offer capital and revenue grants to local community organisations in response to demand
evidenced in part through community consultation during the development stage.  All
applications to this will be subject to the assessment and approval process outlined in this
report. 
The Investment Plan originally proposed that grants of between £10,000 and £100,000 be
made available, with a smaller amount available in Year 2 and a larger pot available in Year
3.  This was due to the increasing allocation of annual funding by UK Government, with
most of the funding being made available in Year 3. 
Given the smaller size of the grant fund available in Year 2, it has been agreed through
engagement with third sector representatives and Connected Communities that this fund
can best service local communities in grants up to a maximum of £25,000. This will be
reviewed in advance of Year 3 when substantially increased funding is available.  £58,000
of the fund for Council revenue projects from Year 1 has been reallocated to the
Communities in year 2. Initial expressions of interest from communities have identified need
for both capital and revenue support, and this will further ensure carry forward amounts
from year 1 will be appropriately and efficiently disbursed. 
Significant ongoing engagement with the third sector and communities will continue to
characterise the management of this fund in the remaining years of the SPF programme. 
This will include identifying eligible activity, reviewing the assessment process, and overall
programme evaluation. This will empower local communities and ensure the Fund delivers
what is needed in the most appropriate way. 
The Shared Prosperity Fund is intended to be flexible, agile, and responsive to local needs.
It is therefore intended applications to the Communities and Place Fund are considered in
the same spirit.  Proposals have been informed by: 
• Existing good practice. 
• Participatory Budgeting principles.
• Initial expressions of interest from the community which shaped the Investment Plan. 
• Engagement with Council Services and community stakeholder representatives
including The Ayrshire Community Trust (TACT) and Arran Community & Voluntary
Service (ACVS).
• Additional engagement with third sector organisations. 
The process seeks to position the Fund appropriately within the wider funding landscape,
avoiding duplication and adding value. It ensures projects are assessed against a range of
factors, including the aims and objectives of SPF and local priorities identified in the Local
Outcomes Improvement Plan, and the Local Island Plans. 
Elected Member and Community engagement 
UKSPF is expected to support appropriate activity across North Ayrshire. When the
Community and Place Grant fund is launched, we will undertake North Ayrshire-wide
290

Page 291

community engagement to ensure information is disseminated and communities are
engaged.  This will utilise existing links via Locality Partnerships alongside an online event
and social media campaign. 
This will include: 
• An Elected Members briefing session in advance of the launch of the Fund to familiarise
Members with the Fund and enable awareness raising within constituencies.
• Briefings to the Locality Partnerships outlining the approach to the Fund, assessment
process and timescales to raise awareness and support applications.
• E-mail information to Elected Members, Locality Partnerships and Community Planning
Partnership members to allow sharing of information through networks to raise
awareness of the Fund and support applications.
• Awareness raising and funding surgery sessions in each locality.  Elected Members will
be engaged as part of this process to raise awareness and encourage participation
within communities.  These will be promoted widely with support from Connected
Communities.
• Updates at key points to Elected Members and Locality Partnerships on the Fund and
the outcome of round(s) of funding.  This would include briefings in advance of future
rounds as detailed above. 
The events in each locality will be open to all and not restricted to communities and
residents within that locality.  This approach will ensure communities are fully informed as
to the scope, aims and requirements of the fund, can ask questions and seek clarifications,
and are equipped to submit complete and detailed applications.  The combination of in-
person and online events will ensure maximum opportunity for engagement with
communities and equity of access to information regardless of location, digital skills or
digital access. 
Overview of application, assessment and approval process 
The application, assessment and approval process aims to ensure equity, transparency
and maximum complementarity in how the Fund is managed. It is also intended to be
proportionate to the level of funding available. 
The following flowchart provides an overview of the proposed process including
engagement sessions:
291

Page 292

292

Page 293

Application, assessment and approval process 
An initial sift of applications will assess on a pass/fail basis to ensure appropriateness of the
projects and organisations. Projects that do not pass the initial sift cannot proceed to full
assessment. For this reason, applications will be sifted on receipt meaning, where possible,
applicants can address any issues and reapply within the funding round. 
All applications proceeding to full assessment will be subject to the same assessment
process. They will be required to demonstrate three areas of competence: 
1. Intended outputs and outcomes in line with those identified for the SPF Communities
and Place interventions. These are as follows: 
Capital Interventions
• S1 Place based investments, regeneration and town centre improvements, which
could include better accessibility for disabled people, including capital spend and
running costs.
• S3 Improvements to the natural environment and green and open space which could
include community gardens, watercourses and embankments, along with
incorporating natural features into wider public spaces.
• S4 Design and management of the built and landscaped environment
• S11 Funding to support relevant feasibility studies.
• S12 Investment and support for digital infrastructure for local community facilities
• S13 Support for linking communities together and with employment opportunities
with a focus on decarbonisation. 
Revenue Interventions
• S1 Place based investments, regeneration and town centre improvements, which
could include better accessibility for disabled people, including capital spend and
running costs. 
• S2 Support and improvement of community assets and infrastructure projects.  This
could include support for decarbonisation of facilities, energy efficiency audits, and
installation of energy efficiency and renewable measures in community buildings
(including capital spend and running costs). 
• S5 Support for sport, arts, cultural, heritage and creative activities, projects and
facilities and institutions 
• S6 Funding for active travel enhancements and other small scale strategic transport
projects.
• S7 Funding for the development and promotion of wider campaigns which
encourage people to visit and explore the local area. 
• S8 Funding for impactful volunteering and/or social action projects to develop social
and human capital in local places. 
• S9 Investment in capacity building, resilience (including climate change resilience)
and infrastructure support for local civil society.
• S10 Community measures to reduce the cost of living, including through measures
to improve energy efficiency, and combat fuel poverty and climate change. 
2. Alignment with North Ayrshire Council and Community Planning Partnership strategy.  It
should be noted that whilst we expect to see alignment with locality priorities in
applications, this does not inform the structure of the overall fund. 
293

Page 294

3. Project deliverability, including organisational capacity and contingency planning. This
will assess considerations such as risk management, community and stakeholder
support, land or asset ownership and further external approvals needed, for example
Planning consent. 
UK Government has not mandated any match funding requirement.  This is, however,
encouraged and appropriate projects which have secured match funding, or state an
intention to do so, for example, by using SPF as leverage, will score more highly.  Similarly,
there is no mandatory requirement for partnership working to deliver, however, this again is
encouraged where appropriate. 
Final award decisions will be taken by an assessment panel. Individual membership is to be
confirmed; however it is the intention that this panel includes representation from: 
• North Ayrshire Council Regeneration and Connected Communities;
• The Ayrshire Community Trust;
• Arran Community and Voluntary Service;
• North Ayrshire Youth Forum; and
• North Ayrshire Community Planning Partnership. 
A draft application and assessment process, scorecard and assessment matrix have been
developed informed by this proposal and will be reviewed by Legal Services.  Applications
will be assessed by each member of the panel individually and an overall score agreed by
consensus at a panel meeting.  Unsuccessful projects will be given feedback on their
application and can choose to reapply to the Fund in a later round. 
Application and award timescale 
Subject to Cabinet approval, the proposed timescales for applications to the Fund in
2023/24 are as follows: 
Week Commencing Activity
TBC June 2023 Elected Member briefing session
5 June 2023 General fund information published
12 June 2023 Detailed fund information and application guidance
published
19 June 2023 Year 1 applications open 
1 June - 6 July 2023 Locality Partnership and Community sessions
21 July 2023 Year 1 applications close
24 - 28 July 2023 Individual Panel scoring
2 August 2023 Assessment panel, decisions and feedback notified 
The application and assessment process will be reviewed when the awards and feedback
have been notified. It will be amended as required to ensure it meets the needs of
communities and achieves the aims of the fund. An iterative approach to improvements will
be taken. It is expected learning from the year 1 application process will inform subsequent
rounds.  
294

Page 295

Council Projects 
£349,208 capital and £107,106 revenue funding has been allocated to support smaller
scale Council led projects that meet the aims and objectives of SPF and allow the Council
to meet strategic goals. These projects will be aligned to the Regeneration Delivery Plan.
Wherever possible match funding will be sought to support the delivery of these projects. 
295

Page 296

296