NORTH AYRSHIRE COUNCIL  
30 May 2023 
Cabinet
Title: UK Shared Prosperity Fund – Communities and Place Fund
Purpose: To update Cabinet on the UK Shared Prosperity Fund (SPF) and
seek approval of the proposed approach to the Communities and
Place Grant Fund. 
Recommendation: That Cabinet: 
a) Notes the update on the UK Shared Prosperity Fund; and
b) Approves the proposed approach to the Communities & Place
Grant fund provided at Appendix 1. 
1. Executive Summary 
1.1  The UK Shared Prosperity Fund is part of the UK Government’s Levelling Up
Agenda.  This will provide £2.6bn of funding across the UK between April 2022 and
March 2025.  This replaces European Union funding that has historically supported
employability and skills projects and local business activity in North Ayrshire.  The
overarching objective of the Fund is to build pride in place and increase life chances,
underpinned by four levelling up objectives and three investment priorities. 
1.2 North Ayrshire Council’s Investment Plan for the £6.2m allocation was approved by
Cabinet in August 2022 and subsequently by the UK Government in December 2022. 
This included the development of a competitive grant scheme and participatory
budgeting programme for communities under the Communities and Place investment
priority. 
1.3 The proposed approach to the Communities and Place Fund has been developed in
consultation with relevant stakeholders and community representatives. It seeks to
leverage community capacity to meet local needs in line with the Shared Prosperity
Fund objectives. This report provides an update on activity to date and seeks
approval for the proposed approach to the Communities and Place Fund provided at
Appendix 1. 
2. Background 
2.1 The UK Shared Prosperity Fund (SPF) is part of the UK Government’s Levelling Up
Agenda.  The Fund is delivered centrally by the Department of Levelling Up, Housing
and Communities (DLUHC) with awards made directly to local authorities.  It is a
replacement for the European Social Fund (ESF) and European Regional
Development Fund (ERDF) funding. In North Ayrshire this has funded employability

Page 2

and skills and business support services, alongside regeneration project delivery. 
2.2 The overarching objective of the SPF is to build pride in place and increase life
chances.  The fund has three investment priorities in addition to an earmarked
amount set aside to deliver adult numeracy activities entitled Multiply: 
• Communities and Place;
• Supporting Local Business; and
• People and Skills. 
2.3 The SPF allocation for North Ayrshire over the three-year programme is £6,200,649. 
This comprises a £5,129,864 core SPF allocation and a £1,070,795 Multiply Fund
allocation.  The annual allocations are detailed in the table below: 
Allocation 2022/23 (£)  2023/24 (£)  2024/25 (£)  Total (£) 
Core SPF  622,555  1,245,110  3,262,189  5,129,854 
Multiply  323,729  373,533  373,533  1,070,795 
Total Allocation (£) 946,284  1,618,643  3,635,722  6,200,649 
2.4 Cabinet approved the North Ayrshire SPF Investment Plan, setting out how we
intend to utilise and deploy the fund, in August 2022. This was subsequently agreed
by the DLUHC in December 2022.  A minimum amount of approximately 15% of the
allocation must be allocated to capital expenditure and a total of 4% is available
towards the administrative costs of running the programme.   
2.5 The supporting Local Business and People and Skills priorities are being managed
as follow-on programmes to the current EU supported Business Support, including
Business Gateway, and Employability services offered by the Council.  The Multiply
adult numeracy service is being delivered in partnership with Community Housing
Advocacy Project (CHAP) and Ayrshire College to support the development of adult
numeracy across North Ayrshire.   
2.6 The Communities and Place investment priority aims to enable places to invest to
restore their community spaces and relationships and create the foundations for
economic development at the neighbourhood level.  Its objectives are to: 
• Strengthen the social fabric and foster a sense of local pride and belonging,
through investment in activities that enhance physical, cultural and social ties and
access to amenities.
• Build resilient, healthy and safe neighbourhoods, through investment in quality
places that people want to live, work, play and learn in, through targeted
improvements to the built and natural environment and innovative approaches to
crime prevention. 
2.7 This investment priority received a £1.52m allocation, which equates to
approximately 21% of the overall allocation.  The capital and revenue breakdowns for
this are detailed in the table below.  This includes the administration and
management costs for the overall SPF Programme over the three years:

Page 3

Funding
Period
Communities and
Place allocation (£)
Capital (£) Revenue (£) Admin (£)
2022/23 221,995 98,414 96,033 27,548
2023/24 341,026 202,330 31,003 107,693
2024/25 961,794 650,794 200,076 110,924
Total (£) 1,524,815 951,538 327,737 245,540 
2.8 The approach to the Communities and Place investment priority outlined in the
Investment Plan aims to support the delivery of community projects through a
competitive grant fund and participatory budgeting programme.  It also aims to
support smaller scale strategic Council projects that meet the aims and objectives of
SPF through a capital and revenue allocation.  The latter will support Council-led
projects that meet the aims and objectives of SPF and contribute to the delivery of
strategic goals.  It is intended that this approach will be referred to as the
Communities and Place Fund going forward. 
2.9 Due to the delayed start to the overall SPF programme, UK Government has
confirmed that Year 1 funds can be carried over into Year 2.  The Cabinet approval
provided delegated authority to the Executive Director (Place) to agree changes to
the funding allocations in consultation with the Portfolio Lead as required.  This is,
however, subject to the approval of credible plans indicating how carry forward will
be utilised.  Credible plans for carry forward have been submitted as part of the
2022/23 UKSPF End Of Year Report, which was submitted on 2 May 2023. There
will be no further carry forward permitted of Year 1 funding, which must be disbursed
fully and promptly. 
2.10 Appendix 1 outlines the proposed approach to the competitive grant fund,
participatory budgeting and Council led projects programme under the investment
priority.  This includes the approach to redistribute the balance of Year 1 funding
which has informed the credible plan submitted to UK Government.  This has been
informed by consultation with Elected Members, Connected Communities,
community organisations and community stakeholders. 
2.11 The approach aims to provide a flexible and inclusive source of funding for
communities to meet local need and achieve local outcomes across a broad range of
activities. This seeks to complement the range of external funding opportunities
currently available and to support community-led projects.  The proposed approach
to engagement with Locality Partnerships, Elected Members and community
organisations on the Fund is also detailed in Appendix 1. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the update on the UK Shared Prosperity Fund; and
b) Approves the proposed approach to the Communities and Place Fund provided
at Appendix 1.

Page 4

4. Implications/Socio-economic Duty 
Financial
4.1 The cost of delivering the Investment Plan and overall SPF Programme including the
Programme Manager and Monitoring and Compliance roles will be funded by the
SPF allocation.  These are set out at Section 2.3 and 2.7 above. 
Human Resources 
4.2 The SPF Programme will be managed by the Programme Manager, with monitoring
and compliance undertaken by the Claims and Compliance Officer.  Both roles will
be funded by the SPF allocation. 
Legal 
4.3 The approved Investment Plan was informed by advice from Legal Services and
has informed the development of the Communities and Place Fund guidance and
application documentation.  The final documentation will be reviewed by Legal
Services prior to launch to ensure compliance. 
Equality/Socio-economic 
4.4 The approved Investment Plan aims to deliver on social and economic outcomes
and was subject to the following impact assessments: Equality and Children’s
Rights; Islands and Fairer Scotland Duty.  The Communities and Place Grant Fund
aims to provide a flexible and inclusive source of funding for communities to meet
local need and achieve local outcomes across a broad range of activities. The
application and assessment process ensures alignment with the Fairer Scotland
Duty and Council priorities, to address socio-economic inequality and embed a
Community Wealth Building approach. 
Climate Change and Carbon 
4.5 The approved Investment Plan aims to improve the North Ayrshire and Ayrshire
economies in accordance with net zero ambitions.  This links with the ambitions of
the Environmental Sustainability and Climate Change Strategy (ESCCS) and the
ambition for a fairer, greener and more inclusive economy as set out in the Council’s
Economic Recovery and Renewal Approach. A key aspiration of the Communities
and Place theme is to deliver measures to support net zero and energy efficiency
and enhance the natural environment. Several interventions specified by the Fund
can deliver on these aims. 
Key Priorities 
4.6 The implementation of the SPF Investment Plan and Communities and Place Fund
will contribute to achieving the Council Plan priority outcomes and will contribute to
the ambitions for active and strong communities, and a sustainable, vibrant,
welcoming and attractive environment.

Page 5

Community Wealth Building 
4.7 The approved Investment Plan was informed by the Community Wealth Building
strategy with the SPF themes cross referenced with the five pillars and respective
related Regeneration Delivery Plan, Economic Recovery and Renewal Plan and
Island Plans. The Investment Plan approach was considered by the CWB Expert
Panel and advice provided on embedding CWB into the proposals. 
4.8 The approach proposed for the Communities and Place Fund ensures investment is
targeted locally to add value to and enhance existing activities across the funding
landscape. It empowers local communities to deliver on their own priorities and
encourages added capacity through partnership working, creating a resilient and
robust local delivery ecosystem. 
5. Consultation 
5.1 The approved Investment Plan was developed by a cross-service team of officers
through a short life steering group with representation from Economic Policy,
Business Support, Employability, Regeneration, Connected Communities, Health &
Social Care Partnership, Procurement, Finance, Legal Services and HR. 
5.2 The Communities and Place Fund proposal has been developed in consultation with
Elected Members (at the Policy Advisory Panel), Connected Communities,
community organisations and community stakeholder representatives as outlined in
Appendix One. This has been further tested through consultation with The Ayrshire
Community Trust and Arran Council for Voluntary Services. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Shona McAllister, Programme Manager – Shared
Prosperity Fund,
on 07773963545. 
Background Papers 
Cabinet Report, UK Shared Prosperity Fund, 23 August 2022
Policy Advisory Panel, UK Shared Prosperity Fund – Communities and Place, 18 April
2023

Page 6

Appendix One
Communities and Place Fund 
The UKSPF Communities and Place investment priority aims to enable places to invest in
restoring their community spaces and relationships and create the foundations for
economic development at the neighbourhood level.  Its objectives are to: 
• Strengthen the social fabric and foster a sense of local pride and belonging, through
investment in activities that enhance physical, cultural and social ties and access to
amenities.
• Build resilient, healthy and safe neighbourhoods, through investment in quality places
that people want to live, work, play and learn in, through targeted improvements to the
built and natural environment, and innovative approaches to crime prevention. 
The investment priority requires Councils to be mindful of how interventions under this
priority align with the existing funding streams received from the Scottish Government
including the Place Based Investment Programme.  The alignment with Scotland’s National
Strategy for Economic Transformation (NSET) also requires to be considered to ensure that
they contribute to a fairer and more equal society, new market opportunities and productive
businesses and regions. 
Thirteen interventions are identified under the investment priority.  The approved North
Ayrshire Investment Plan supports delivery of projects across the range of interventions.  A
series of outcomes and outputs are identified under each intervention and require to be
reported on annually: 
S1 Place based investments for regeneration and town centre improvements
S2 Support and improvement of community assets and infrastructure projects
S3 Improvements to the natural environment and green and open space 
S4 Design and management of the built and landscaped environment.
S5 Support for sport, arts, cultural, heritage and creative activities, projects and
facilities and institutions.
S6 Funding for active travel enhancements and other small scale strategic transport
projects.
S7 Funding for the development and promotion of wider campaigns which encourage
people to visit and explore the local area.
S8 Funding for impactful volunteering and/or social action projects to develop social
and human capital in local places.
S9 Investment in capacity building, resilience and infrastructure support for local civil
society and community groups.
S10 Community measures to reduce the cost of living, including through measures to
improve energy efficiency, and combat fuel poverty and climate change
S11 Funding to support relevant feasibility studies.
S12 Investment and support for digital infrastructure for local community facilities
S13 Support for linking communities together and with employment opportunities with
a focus on decarbonisation. 
The approved Investment Plan outlined that the Communities and Place investment priority
would be comprised of a: 
• Participatory Budgeting programme;
• Competitive grant scheme for communities; and

Page 7

• Funding allocation for Council projects. 
The initial breakdown of the allocation was as follows.  This includes the administration and
management costs for the overall SPF Programme over the three years: 
Activity Year 1 Year 2 Year 3 Total
Participatory Budgeting 0   31,003  31,003  62,006 
Competitive Grants -
revenue 0 0 100,000  100,000 
Competitive Grants - capital 0 102,330  500,000  602,330 
Council Projects - revenue 96,658 0 69,073  165,731 
Council Projects - capital  98,414  100,000  150,794  349,208 
Administration 26,923 107,693 110,924 245,540
Total 1,524,815 
Due to the delayed start to the overall programme, UK Government has confirmed that
Year 1 funds can be carried over into Year 2.  Thereafter there will be no further carry
forward permitted of Year 1 funding, which must be disbursed fully and promptly.  The
Cabinet approval provided delegated authority to the Executive Director (Place) to agree
changes to the funding allocations in consultation with the Portfolio Lead as required.  This
is however subject to UK Government approval of credible plans indicating how carry
forward will be utilised.  The table below outlines the proposed approach to the reallocation
of the funds.  It should be noted that administration costs were slightly higher than
anticipated but remain within the 4% limit. 
Activity Year 1 Year 2 Year 3 Total
Participatory Budgeting 0   31,003  31,003  62,006 
Competitive Grants -
revenue 0 58,000 100,000  158,000 
Competitive Grants - capital 0 102,330  500,000  602,330 
Council projects - revenue
Carry
forward 38,033 69,073  107,106
Council projects - capital 
Carry
forward 198,414 150,794  349,208
Administration 27,548 107,693 110,924 246,165
Total 1,524,815 
The following summarises the proposed approach to each of these allocations under the
Communities and Place Fund. 
Participatory Budgeting 
In line with the Council’s commitment to Participatory Budgeting (PB), 1% of the total SPF
award, amounting to £62,006, has been allocated for PB across years 2 and 3 of the
programme. Projects will require to be aligned to the Communities and Place the thirteen
interventions and contribute to the delivery of the associated outcomes and outputs. 
This element of the fund will be managed by Connected Communities in accordance with
their ongoing community empowerment ambition to provide local ownership of the fund and
give people a say on how the fund is spent in their localities.  This will also be undertaken in
accordance with good practice guidelines outlined in the Participatory Budgeting Toolkit
produced by North, South and East Ayrshire and the Convention of Scottish Local

Page 8

Authorities (COSLA) PB Team.   
Competitive Grants 
The approved Investment Plan identified that a significant proportion of the Communities
and Place allocation would be utilised to develop a competitive grant scheme.  This will
offer capital and revenue grants to local community organisations in response to demand
evidenced in part through community consultation during the development stage.  All
applications to this will be subject to the assessment and approval process outlined in this
report. 
The Investment Plan originally proposed that grants of between £10,000 and £100,000 be
made available, with a smaller amount available in Year 2 and a larger pot available in Year
3.  This was due to the increasing allocation of annual funding by UK Government, with
most of the funding being made available in Year 3. 
Given the smaller size of the grant fund available in Year 2, it has been agreed through
engagement with third sector representatives and Connected Communities that this fund
can best service local communities in grants up to a maximum of £25,000. This will be
reviewed in advance of Year 3 when substantially increased funding is available.  £58,000
of the fund for Council revenue projects from Year 1 has been reallocated to the
Communities in year 2. Initial expressions of interest from communities have identified need
for both capital and revenue support, and this will further ensure carry forward amounts
from year 1 will be appropriately and efficiently disbursed. 
Significant ongoing engagement with the third sector and communities will continue to
characterise the management of this fund in the remaining years of the SPF programme. 
This will include identifying eligible activity, reviewing the assessment process, and overall
programme evaluation. This will empower local communities and ensure the Fund delivers
what is needed in the most appropriate way. 
The Shared Prosperity Fund is intended to be flexible, agile, and responsive to local needs.
It is therefore intended applications to the Communities and Place Fund are considered in
the same spirit.  Proposals have been informed by: 
• Existing good practice. 
• Participatory Budgeting principles.
• Initial expressions of interest from the community which shaped the Investment Plan. 
• Engagement with Council Services and community stakeholder representatives
including The Ayrshire Community Trust (TACT) and Arran Community & Voluntary
Service (ACVS).
• Additional engagement with third sector organisations. 
The process seeks to position the Fund appropriately within the wider funding landscape,
avoiding duplication and adding value. It ensures projects are assessed against a range of
factors, including the aims and objectives of SPF and local priorities identified in the Local
Outcomes Improvement Plan, and the Local Island Plans. 
Elected Member and Community engagement 
UKSPF is expected to support appropriate activity across North Ayrshire. When the
Community and Place Grant fund is launched, we will undertake North Ayrshire-wide

Page 9

community engagement to ensure information is disseminated and communities are
engaged.  This will utilise existing links via Locality Partnerships alongside an online event
and social media campaign. 
This will include: 
• An Elected Members briefing session in advance of the launch of the Fund to familiarise
Members with the Fund and enable awareness raising within constituencies.
• Briefings to the Locality Partnerships outlining the approach to the Fund, assessment
process and timescales to raise awareness and support applications.
• E-mail information to Elected Members, Locality Partnerships and Community Planning
Partnership members to allow sharing of information through networks to raise
awareness of the Fund and support applications.
• Awareness raising and funding surgery sessions in each locality.  Elected Members will
be engaged as part of this process to raise awareness and encourage participation
within communities.  These will be promoted widely with support from Connected
Communities.
• Updates at key points to Elected Members and Locality Partnerships on the Fund and
the outcome of round(s) of funding.  This would include briefings in advance of future
rounds as detailed above. 
The events in each locality will be open to all and not restricted to communities and
residents within that locality.  This approach will ensure communities are fully informed as
to the scope, aims and requirements of the fund, can ask questions and seek clarifications,
and are equipped to submit complete and detailed applications.  The combination of in-
person and online events will ensure maximum opportunity for engagement with
communities and equity of access to information regardless of location, digital skills or
digital access. 
Overview of application, assessment and approval process 
The application, assessment and approval process aims to ensure equity, transparency
and maximum complementarity in how the Fund is managed. It is also intended to be
proportionate to the level of funding available. 
The following flowchart provides an overview of the proposed process including
engagement sessions:

Page 10

No embedded text on this page.

Page 11

Application, assessment and approval process 
An initial sift of applications will assess on a pass/fail basis to ensure appropriateness of the
projects and organisations. Projects that do not pass the initial sift cannot proceed to full
assessment. For this reason, applications will be sifted on receipt meaning, where possible,
applicants can address any issues and reapply within the funding round. 
All applications proceeding to full assessment will be subject to the same assessment
process. They will be required to demonstrate three areas of competence: 
1. Intended outputs and outcomes in line with those identified for the SPF Communities
and Place interventions. These are as follows: 
Capital Interventions
• S1 Place based investments, regeneration and town centre improvements, which
could include better accessibility for disabled people, including capital spend and
running costs.
• S3 Improvements to the natural environment and green and open space which could
include community gardens, watercourses and embankments, along with
incorporating natural features into wider public spaces.
• S4 Design and management of the built and landscaped environment
• S11 Funding to support relevant feasibility studies.
• S12 Investment and support for digital infrastructure for local community facilities
• S13 Support for linking communities together and with employment opportunities
with a focus on decarbonisation. 
Revenue Interventions
• S1 Place based investments, regeneration and town centre improvements, which
could include better accessibility for disabled people, including capital spend and
running costs. 
• S2 Support and improvement of community assets and infrastructure projects.  This
could include support for decarbonisation of facilities, energy efficiency audits, and
installation of energy efficiency and renewable measures in community buildings
(including capital spend and running costs). 
• S5 Support for sport, arts, cultural, heritage and creative activities, projects and
facilities and institutions 
• S6 Funding for active travel enhancements and other small scale strategic transport
projects.
• S7 Funding for the development and promotion of wider campaigns which
encourage people to visit and explore the local area. 
• S8 Funding for impactful volunteering and/or social action projects to develop social
and human capital in local places. 
• S9 Investment in capacity building, resilience (including climate change resilience)
and infrastructure support for local civil society.
• S10 Community measures to reduce the cost of living, including through measures
to improve energy efficiency, and combat fuel poverty and climate change. 
2. Alignment with North Ayrshire Council and Community Planning Partnership strategy.  It
should be noted that whilst we expect to see alignment with locality priorities in
applications, this does not inform the structure of the overall fund.

Page 12

3. Project deliverability, including organisational capacity and contingency planning. This
will assess considerations such as risk management, community and stakeholder
support, land or asset ownership and further external approvals needed, for example
Planning consent. 
UK Government has not mandated any match funding requirement.  This is, however,
encouraged and appropriate projects which have secured match funding, or state an
intention to do so, for example, by using SPF as leverage, will score more highly.  Similarly,
there is no mandatory requirement for partnership working to deliver, however, this again is
encouraged where appropriate. 
Final award decisions will be taken by an assessment panel. Individual membership is to be
confirmed; however it is the intention that this panel includes representation from: 
• North Ayrshire Council Regeneration and Connected Communities;
• The Ayrshire Community Trust;
• Arran Community and Voluntary Service;
• North Ayrshire Youth Forum; and
• North Ayrshire Community Planning Partnership. 
A draft application and assessment process, scorecard and assessment matrix have been
developed informed by this proposal and will be reviewed by Legal Services.  Applications
will be assessed by each member of the panel individually and an overall score agreed by
consensus at a panel meeting.  Unsuccessful projects will be given feedback on their
application and can choose to reapply to the Fund in a later round. 
Application and award timescale 
Subject to Cabinet approval, the proposed timescales for applications to the Fund in
2023/24 are as follows: 
Week Commencing Activity
TBC June 2023 Elected Member briefing session
5 June 2023 General fund information published
12 June 2023 Detailed fund information and application guidance
published
19 June 2023 Year 1 applications open 
1 June - 6 July 2023 Locality Partnership and Community sessions
21 July 2023 Year 1 applications close
24 - 28 July 2023 Individual Panel scoring
2 August 2023 Assessment panel, decisions and feedback notified 
The application and assessment process will be reviewed when the awards and feedback
have been notified. It will be amended as required to ensure it meets the needs of
communities and achieves the aims of the fund. An iterative approach to improvements will
be taken. It is expected learning from the year 1 application process will inform subsequent
rounds.

Page 13

Council Projects 
£349,208 capital and £107,106 revenue funding has been allocated to support smaller
scale Council led projects that meet the aims and objectives of SPF and allow the Council
to meet strategic goals. These projects will be aligned to the Regeneration Delivery Plan.
Wherever possible match funding will be sought to support the delivery of these projects.