Democracy Spraffa

Agenda Document Pack - Cabinet - 21/03/2023

North Ayrshire Council · 21 March 2023
Back to Cabinet — 21 March 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Cabinet 
A Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
21 March 2023 at 14:30 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 21
February 2023 will be confirmed and the Minutes signed in accordance
with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973 (copy enclosed).  
EDUCATION ITEMS FOR DECISION 
3 Proposal to close Kilwinning Early Years Centre and incorporate the
provision as a new early years’ class at Pennyburn Primary School
Submit a report by the Executive Director (Communities and Education)
providing feedback on the outcome of the statutory public consultation
and seeking approval to close Kilwinning Early Years Centre and
incorporating the provision as a new early years class at Pennyburn
Primary School (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
4 Future Holiday Meals Provision
Submit a report by the Executive Director (Communities and Education)
on the future provision of the school holiday meals provision and the use
of the Scottish Government funding (copy enclosed).  
GENERAL BUSINESS FOR DECISION  
Reports by the Chief Executive 
5 Access to Information rights in Scotland: a consultation
Submit a report by the Head of Service (Democratic Services) seeking
approval for the proposed North Ayrshire Council submission to the
Scottish Government’s Consultation on access to information rights in
Scotland (copy enclosed). 
6 Revenue Budget 2022/23: Financial Performance to 31 January 2023
Submit a report by the Head of Service (Finance) on the financial
performance for the Council at 31 January 2023 (copy enclosed). 
7 Capital Programme Performance to 31 March 2023
Submit a report by the Head of Service (Finance) on progress in
delivering the Capital Investment Programme for 2022/23 (copy
enclosed). 
8 Strategic Risk Register 2023/24
Submit a report by the Head of Service (Finance) seeking approval of the
Strategic Risk Register for 2023/24 (copy enclosed).  
Report by the Director (Health and Social Care Partnership) 
9 Financial Inclusion Strategy 2023-28
Submit a report by the Director (Health & Social Care Partnership)
providing an update on progress with the Financial Inclusion Project and
the development of a Strategy for North Ayrshire (copy enclosed).  
Reports by the Executive Director (Communities and Education) 
10  Islands Emergency Cost Crisis Fund
Submit a report by the Executive Director (Communities and Education)
seeking approval for the allocation of the Scottish Government Islands
Emergency Cost Crisis Fund (copy enclosed). 
11  Community Asset Transfer of the Toilet Block and adjacent land at
Ardrossan South Beach
Submit a report by the Executive Director (Communities and Education)
providing an update on progress relating to the Community Asset
Transfer of the toilet block and adjacent land at Ardrossan South Beach
and seeking approval for the revised rent for the asset being transferred
to Ardrossan Community Development Trust (copy enclosed).
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Reports by the Executive Director (Place) 
12  Home Office Asylum Dispersal
Submit a report by the Executive Director (Place) on the Home Office’s
plans for asylum dispersal across the United Kingdom and highlighting
the potential impact for North Ayrshire, taking into consideration the
humanitarian resettlement schemes already being supported (copy
enclosed). 
13  Roads Structures & Street Lighting Maintenance Programme 2023/24
Submit a report by the Executive Director (Place) seeking approval of the
proposed Roads, Structures and Street Lighting Maintenance
Programme for 2023/24 (copy enclosed). 
14  Consultation on Scottish Government draft Energy Strategy and Just
Transition Plan
Submit a report by the Executive Director (Place) seeking approval for
the proposed response to the consultation on the Scottish Government’s
draft Energy Strategy and Just Transition Plan (copy enclosed). 
15  Advertising and Sponsorship Framework
Submit a report by the Executive Director (Place) seeking approval of the
proposed Advertising and Sponsorship Framework for council assets
(copy enclosed). 
16  Urgent Items
Any other items which the Chair considers to be urgent. 
17  Exclusion of the Public - Para 9
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
9 of Part 1 of Schedule 7A  of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
18  Montgomerie Park – Proposed Sale of Phase One Rental Site
Submit a report by the Executive Director (Place) advising of the Heads
of Terms which have been negotiated for the sale of the Phase 1 Retail
Site prior to entering missives for the sale of the site (copy enclosed).
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
4

Page 5

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Cabinet Sederunt 
Elected Members 
Marie Burns (Chair)
Shaun Macaulay (Vice-Chair)
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen 
Church Representatives 
Mr Andrew Bruce
Ms Elizabeth Turbet
Rev Mark Goodman
Teaching Representative 
Ms Jacqui MacKenzie 
Youth Council Representatives 
Chair: 
Apologies: 
Attending: 
5

Page 6

6

Page 7

Cabinet
21 February 2023 
IRVINE, 21 February 2023 - At a Meeting of the Cabinet of North Ayrshire Council at
2.30 p.m. 
Present
Marie Burns, Tony Gurney, Alan Hill, Margaret Johnson, Christina Larsen and Shaun
Macaulay; Elizabeth Turbet, Rev Mark Goodman (Church Representatives); and
Jackie MacKenzie (Teaching Representative) (Agenda Item 3). 
Also Present
Cameron Inglis, Matthew McLean, Chloé Robertson and Davina McTiernan. 
In Attendance 
C. Hatton, Chief Executive and M. Boyd, Head of Service (Finance) (Chief
Executive’s Service); R. McCutcheon, Executive Director, D. Hammond, Head of
Service (Sustainability, Corporate Property and Transport), N. McIlvanney, Interim
Head of Service (Growth, Investment and Employability) and L. Neill, Senior
Manager (Employability) and (Place); A. Sutton, Executive Director and R. Leith,
Head of Service (Connected Communities) (Communities and  Education); C.
Cameron, Director (Health and Social Care Partnership); R. Lynch, Senior Manager
and C. Cochrane, Solicitor (Legal Services), J. Hutcheson, Senior Communications
Officer, and C. Stewart, D. McCaw and S. Wilson, Committee Services Officers
(Democratic Services). 
Also In Attendance
M. McPhail, L. Barrie and C. Glencorse (North Ayrshire Leisure Limited). 
Chair
Marie Burns in the Chair. 
1. Minutes 
The Minutes of the Meeting of the Cabinet held on 24 January 2023 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the
Local Government (Scotland) Act 1973. 
2. Declarations of Interest 
In terms of Standing Order 11 and Section 5 of the Code of Conduct for Councillors,
Councillor Gurney, as an employee of UWS, made a declaration during
consideration of Agenda Item 6 (Apprenticeship Proposal). Having applied the
objective test, the nature of the interest was such that Councillor Gurney did not
require to leave the meeting for this item of business. 
Agenda Item 2
7

Page 8

3. Educational Trust Funds 
Submitted a report by the Executive Director (Communities and Education) on the
anticipated annual income and expenditure of the Charitable Trusts administered by
the Education Service and seeking approval for the level of funding to be made
available for disbursement during 2022/23 academic session. 
The Cabinet agreed to (a) approve the 2022/23 revenue estimates for the Charitable
Trusts detailed in section 2.3 of the report; (b) approve the amounts available for
disbursement noted at section 2.3 of the report; and (c) the capital spend from the
dormant and low value Trusts. 
4. Consultation on a Proposed Freedom of Information Reform (Scotland)
Bill 
Submitted a report by the Head of Service (Democratic Services) seeking approval
for the proposed formal consultation response to the Katy Clark MSP’s Consultation
on the proposal for a bill to reform Freedom of Information legislation in Scotland. 
The Consultation paper and proposed response were set out at Appendices 1 and 2,
respectively, to the report. 
The Cabinet agreed to approve the submission of the proposed consultation
response as set out at Appendix 2 to the report. 
5. North Ayrshire Leisure Limited (NALL) Performance and Impact Report
incorporating the 2023-24 Budget 
Submitted a report by the Executive Director (Communities and Education) seeking
approval for the North Ayrshire Leisure Limited (NALL) Performance and Impact
Report incorporating the 2023-24 Budget. The NALL Performance and Impact Report
incorporating the 2023/24 Budget was attached at Appendix 1 to the report. 
The Cabinet also received a presentation from KA Leisure detailing the performance
and impact work undertaken by the organisation to date to take the organisation
forward and bring about recovery and improvements. 
Members asked questions and were provided with further information in relation to: 
• the significant work and effort that had been put in with regard to achieving a
balanced budget position given the scale of challenge in terms of post-Covid
recovery, together with collaborative working in order to achieve this;
• the measures that had been taken, or were proposed to be taken, in relation
to energy management and efficiency, to reduce cost thresholds as much as
possible; and
• the impact of various initiatives, such as the health and wellbeing service,
were making in terms of bringing forward improvements and positive
differences in promoting health and wellbeing, etc. to the community of North
Ayrshire. 
8

Page 9

The Cabinet agreed to (a) note (i) the North Ayrshire Leisure Limited (NALL)
Performance and Impact Report incorporating the 2023-24 budget as set out at
Appendix 1 to the report and (ii) the projected balanced budget position in 2022-23;
and (b) authorise officers to continue to progress the recovery of the business,
including the Recovery and Renewal Plan. 
6. North Ayrshire Council’s Apprenticeship Proposals 
Submitted a report by the Executive Director (Place) providing an update on the
North Ayrshire Council’s Modern Apprenticeship Programme and seeking approval
to develop the Council’s apprenticeship offer and deliver an enhanced programme
from April 2023 to include new entrants and support for existing employees.
Feedback received from current and previous apprentices was sought to assist in the
review, together with a refresh of the current apprenticeship offering, and this was
set out in Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: 
• the range of apprenticeships on offer including partnerships with Ayrshire
College and the University of the West of Scotland (UWS); and
• partnership working to deliver on community wealth building opportunities in
terms of good practice as well as being part of the Fair Work offer for
employees. 
The Cabinet agreed (a) to note the contents of the report and (b) the Council’s
apprenticeship programme on the basis set out in the report. 
7. Lease Acquisition – Seabed at the Ardrossan Strategic Regeneration
Site 
Submitted a report by the Executive Director (Place) seeking approval to lease
1,478m² of seabed from Crown Estate Scotland to enable the development of the
proposed revetment works at the Ardrossan Strategic Regeneration Site. The Site
Plan was attached at Appendix 1 to the report. 
On behalf of Members, Councillor Burns, Chair, thanked officers for bringing this
report forward and noted that it was encouraging to see the pace of progress with
the new campus development in accordance with the updated programme. 
The Cabinet agreed to approve the lease acquisition of the seabed from Crown
Estate Scotland for a period of 99 years at a grassum rent of £38,850, exclusive of
VAT. 
8. Electric Vehicle Charging Infrastructure Investment in Ayrshire 
Submitted a report by the Executive Director (Place) on the findings from the
Ayrshire Public Electric Vehicle Charging Business Case and the proposed next
steps. Potential locations for North Ayrshire proposed EVCI and a Commercial
Model Assessment were set out at Appendices 1 and 2, respectively, to the report. 
9

Page 10

Members asked questions and were provided with further information in relation to: 
• the anticipated tariff for the use of Electric Vehicle (EV) charge points,
including confirmation that there would be a universal tariff across Ayrshire to
assure consistency; and
• any influence which could be pursued by the Council in terms of the
proposals, notwithstanding the preferred delivery mechanism for expansion of
the public vehicle charging network. 
The Cabinet agreed to (a) note the findings from the Ayrshire Public Electric Vehicle
Charging Business Case including the identification of a new concession contract as
the preferred delivery mechanism for expansion of the public vehicle charging
network; (b) provide delegated authority to the Executive Director (Place) to develop
and enter into an Inter Authority Agreement with East and South Ayrshire
(represented by the Ayrshire Roads Alliance) to govern the specification,
procurement, implementation and operation of the proposed concession contract;
and (c) receive a further update report on completion of (b) above, prior to the
procurement of the proposed concession contract. 
The meeting ended at 3.40 p.m.
10

Page 11

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Proposal to close Kilwinning Early Years Centre and
incorporate the provision as a new early years’ class at
Pennyburn Primary School 
Purpose:  • To provide feedback to Cabinet on the outcome of the
statutory public consultation.
• To seek approval to close Kilwinning Early Years Centre and
incorporate the provision as a new early years class at
Pennyburn Primary School. 
Recommendation:  That Cabinet agrees to:
• Note the content of the Consultation Report at Appendix 1.
• Close Kilwinning Early Years Centre and incorporate the
provision as a new early years class at Pennyburn Primary
School from August 2023. 
1. Executive Summary 
1.1 On 27 September 2022, Cabinet agreed to commence a Statutory Public Consultation
on the proposal to close Kilwinning Early Years Centre and incorporate the provision as
a new early years class at Pennyburn Primary School. 
1.2 The consultation opened on Tuesday 25 October (due to the additional in-service day
on Monday 24 October) and closed on Friday 16 December 2022. Thereafter, Education
Scotland provided their report, which is included as Appendix 3 of the Council’s
Consultation Report. The Council’s Consultation Report was made available to the
public from 6 to 27 February 2023. 
1.3 Only 2 formal online responses were received, with a further 84 from Pennyburn Primary
School pupils. Taking into account all responses received, 93% agreed with the
proposal. 
1.4 Cabinet is asked to approve the report recommendation. If the proposal is approved,
the Council is required, in terms of the Schools (Consultation) (Scotland) Act 2010, to
notify Scottish Ministers within 6 days of making this decision. The Council is also
required to place a notice on its website of the decision and of the opportunity and
method for making representations to Scottish Ministers. Scottish Ministers then have
a period of 8 weeks following an authority’s decision in which to decide to call-in the
decision or not. Until the Council has been notified of the outcome, the proposal cannot
be implemented.
Agenda Item 3
11

Page 12

1.5 Taking into account the process outlined above, if approved by NAC Cabinet and
Scottish Minsters, the change will come into effect from the start of the new session,
August 2023. 
2. Background 
2.1 On 27 September 2022, Cabinet agreed to commence a Statutory Public Consultation
on the proposal to close Kilwinning Early Years Centre and incorporate the provision as
a new early years class at Pennyburn Primary School. 
2.2 The Proposal Document was emailed to all statutory consultees by 25 October 2022.
The link to the document was also made available to all parents/carers of Kilwinning
Early Years Centre and Pennyburn Primary School via email and a hard copy as
made available at Cunninghame House. 
2.3 A total of 2 formal online responses were received, both agreeing with the proposal,
with one providing their reason: 
“Easier transitions for kids going from the nursery to the school. Also easier for
families who have kids in both the nursery and the school when communicating for
absences.”. 
2.4 Children in P4-7 at Pennyburn Primary School were asked to complete an online form
to share their thoughts and views on the proposal. In consultation with the Head
Teacher, the following questions were asked: 
• Do you think it is a good idea that Kilwinning Early Years Centre should be part of our
school?
• Why? 
A total of 84 responses were received from pupils and the table below provides a
breakdown of the answers to question (i): 
Yes 78
No 6 
2.5 Key themes from the primary school pupils who agreed with the proposal can be
summarised as follows: 
• Working together on joint activities, assemblies and shows;
• Closer contact will help with the move from early years to primary school;
• Sharing a Head Teacher means not too much change for P1;
• Contact with siblings, e.g., for photographs together; and
• One school/early years drop off will make it easier for parents, especially those who
work. 
2.6   The reasons given by the children who did not agree are noted below: 
• Consideration of how younger children will feel about being part of a larger provision;
and
• Perception that staff may lose their jobs. 
12

Page 13

2.7 The detail on all issues raised and the Council’s response to these is contained within
the published report at Appendix 1. 
2.8 The consultation closed on 16 December 2022 and all documents were sent to
Education Scotland. The Schools (Consultation) (Scotland) Act 2010 requires that
Education Scotland provides an independent and impartial consideration of this
proposal. 
2.9 In preparing that report, HM Inspectors undertook the following activities: 
• Consideration of all relevant documentation provided by the Council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents/carers and others; and
• Visits to the Kilwinning Early Years Centre and Pennyburn Primary School, including
discussion with relevant consultees. 
2.10  Education Scotland agrees with the potential educational benefits of this proposal. Clear
opportunities to enhance the provision through improved transitions and joint working
were identified. The physical layout of the building was seen to lend itself to this
approach and good existing staff relationships were recognised. Implementation of the
proposal would provide an opportunity to improve both the relationships with parents
and communication across all stages to better support children and families. Education
Scotland asked the Council to ensure that stakeholders are kept informed as decisions
are made. 
2.11 Taking all responses into account, 93% were in favour of the proposal to close Kilwinning
Early Years Centre and incorporate the provision as a new early years class at
Pennyburn Primary School. 
2.12 If the proposal is approved, the Council is required, in terms of the Schools
(Consultation) (Scotland) Act 2010, to notify Scottish Ministers within 6 days of making
the decision. The Council is also required to place a notice on its website of the decision
and of the opportunity to make representation to Scottish Ministers. 
2.13 Scottish Ministers then have a period of 8 weeks following an authority’s decision in
which to decide to call-in the decision or not. The first 3 weeks of this period is to allow
stakeholders to make representations either against or in support of the decision. These
can be made by emailing schoolclosure@gov.scot, or in writing to: 
Scottish Government St Andrew’s House Regent Road Edinburgh EH1 3DG 
2.14 Scottish Minsters then have a further 5 weeks to consider all documents and
representations. Until the Council has been notified of the outcome, the proposal
document cannot be implemented. 
3. Proposals 
3.1 That Cabinet agrees to: 
• Note the content of the Consultation Report at Appendix 1; and
• Close Kilwinning Early Years Centre and incorporate the provision as a new early years
class at Pennyburn Primary School from August 2023. 
13

Page 14

4. Implications/Socio-economic Duty 
Financial 
4.1 If approved following the Statutory Public Consultation, there will be recurring financial
savings of £63,286 arising from the deletion of the Head of Centre post. A provisional
job sizing review of the leadership team at Pennyburn Primary School has been
undertaken to understand the impact of this proposal on the salary levels of this team.
If this proposal is approved, it is anticipated there will be additional salary costs in the
region of £2,300 leading to an estimated net cost saving of £60,000. 
Human Resources 
4.2 A new Early Years Manager post would be created within existing budgets.  Relevant
Trade Unions will be engaged in this process. 
Legal 
4.3 Under the terms of the Schools (Consultation) (Scotland) Act 2010 (as amended),
statutory public consultation is required where there is a proposal to permanently
discontinue a ‘school’. The consultation was carried out in accordance with the Schools
(Consultation) (Scotland) Act 2010. 
Equality/Socio-economic 
4.4 There will be no negative impacts on the staff or children and families who attend KEYC
through this proposal. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This proposal contributes to North Ayrshire Council’s Key Priority to ensure children and
young people have the best start in life. 
Community Wealth Building 
4.7 None as a direct result of this report. 
5. Consultation 
5.1 In line with the Schools (Consultation) (Scotland) Act 2010, all interested parties have
been given the opportunity to express their views on the proposal. 
Audrey Sutton
Executive Director (Communities & Education) 
14

Page 15

For further information please contact Andrew McClelland, Head of Service (Education),
on 01294 324413. 
Background Papers
Appendix 1 – Consultation Report
15

Page 16

16

Page 17

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Future Holiday Meals Provision 
Purpose:  To provide proposals for the future provision of the school holiday
meals provision and the use of the Scottish Government funding. 
Recommendation:  It is recommended that Cabinet:
a) Approves the approach to the future use of the Scottish
Government holiday meals funding as proposed in this
report;
b) Approves a summer programme of activities and food in
localities to be designed with community partners; and
c) Approves the replacement of shopping vouchers with a cash
first approach for families with an assessed entitlement to
free school meals. 
1. Executive Summary 
1.1 Funding has been made available by Scottish Government to enable the delivery of 
alternative free school meal provision to all children and young people, eligible for free
school meals based on low income, during the school holidays.   
1.2 2022 saw the return of face-to-face activities through co-producing a holiday meals
programme with our community partners. This paper sets out proposals including a
continuation of this partnership to deliver a programme of summer activities in the heart
of our communities which is sustainable and impactful. 
1.3  Shopping vouchers have been in use since July 2020 as part of the emergency Covid
response and subsequently to deliver support during school holiday periods.  This report
sets out a proposal to align the holiday meals support with other council payments and
supports via a cash first approach. This approach is not only supported by child poverty
groups as it supports a more dignified approach, but it would also provide a more
efficient and accessible support for the eligible families. 
1.4    The holiday meals provision is one aspect of the support available to families, who have
also benefited from the recent increase in the Scottish Child Payment and other
benefits. 
Agenda Item 4
17

Page 18

2. Background 
2.1 North Ayrshire Council (NAC) has been running programmes of school holiday activities
for primary age children, including meals, during school holidays since 2013. Over the
years the NAC programme has developed, with partners joining the group of staff
delivering activities. During the more challenging lockdown periods of the Covid-19
pandemic, the Council adapted the delivery to a voucher scheme to ensure that low-
income households and individuals could still access food. 
2.2 April 2022 saw the return of activities and meals being provided in localities and this
was supported by our community partners.  From April 2022, the holiday programme
was also expanded to include young people attending secondary school.  To increase
uptake and remove any stigma and reluctance to visit schools during holidays,
community halls, centres and libraries were used instead of schools. This ensured that
support was offered in the heart of our communities. 
2.3 The activity and meal programme ran for the Easter break and most of the summer
break in 2022.  The number of meals provided for Easter and Summer was 4,622 and
16,213 respectively.  A voucher was also issued to all families with an assessed
entitlement for free school meals. This ensured that those who did not attend a local
holiday programme still had provision to purchase food during the holiday period. 
Funding
2.4 In 2021/22, the Scottish Government provided £0.712m funding to the Council to enable
the provision of alternative free school meal provision to all children and young people,
eligible for free school meals based on low income, in primary and secondary age
groups, during the school holidays.  This provision covered the 2022 summer holidays;
the Christmas and Easter holidays during the 2022-23 school year; and the mid-term
holidays in October and February. The same level of funding has been confirmed for
2023/24. Holiday meals provision is one aspect of the support available to families, who
have also benefited from the recent increase in the Scottish Child Payment and other
benefits. The guidance indicates that this provision can again be delivered through a
flexible approach, for example through direct cash payments to eligible families;
supermarket vouchers; or the delivery of food packages. 
2.5 In North Ayrshire, vouchers have been provided to eligible families since July 2020 and
introduced as part of the emergency response to the pandemic and this has continued
as the method of support to families. 
2.6 Vouchers are procured from a supplier and do have some limitations both in terms of
administration and use for the families.  The vouchers are not available for redemption
at all retailers thus restricting to some extent where families can use them. Voucher
codes are issued via email to parents/carers who then must download the actual
voucher to their device for use in the shop.  Those without email are sent a hardcopy of
the voucher, which involves a more protracted process, officer time and an additional
cost for postage. 
18

Page 19

2.7  The process for vouchers for families on Arran has been modified to take account of
local circumstances.  Currently Facilities Management staff will purchase the required
number of vouchers from a mainland Co-op and then put each voucher in an envelope
and post them to the eligible families.  The Co-op is the only mainstream shopping outlet
on the island that will accommodate a voucher scheme. Families on Cumbrae currently
receive the electronic or paper voucher like families on the mainland, due to the close
proximity and ease of access to the mainland to redeem their vouchers. 
2.8 The voucher process has an administration fee on top of the value of the vouchers
purchased.  For financial year 2022/23 the administrative fee was circa £2,500. In
addition, vouchers can only be issued in denominations of £5 with a minimum of £5
being purchased. This means that the value of the payment is slightly lower than the
equivalent of the school meal credit allocation.  The school meal allocation is £2.05 per
day however for a full week we allocate a £10 voucher as we cannot issue an exact
value of £10.25. 
2.8 The contract for the voucher supplier is due to end in March 2023 therefore
consideration of options available for payment has been undertaken.   
2.9 The recommendation from child poverty organisations continues to be a cash first
approach for any financial support to those in need/eligible.  Direct payments are
described by the Poverty and Inequality Commission as “the most compassionate and
dignified support, giving freedom of choice over what they eat, and should be the
preferred method of support.” Most local authorities are providing support via cash
payments. 
2.10 The Council’s Customer Service team already process cash payments for all other
supports e.g. school clothing grants and child bridging payments.  Changing the school
holiday payment to cash rather than vouchers would provide a consistent approach for
parents/carers and easy access to the funds they are eligible for. This would also
provide a streamlined and efficient approach and where none of the funding is used for
administrative fees or postage. Changing to cash payments ensures that all of the
funding is available for distribution to eligible families, and families will be receiving
exactly what they are entitled to rather than a rounded sum. The allocation under the
new proposal would be £2.05 per day. 
2.11 Direct cash payments would allow the families on Arran and Cumbrae the flexibility to
use their allocation in their local shops and businesses rather than travel in some cases,
a significant distance to redeem them in the Co-op or mainland supermarkets. Island
families will continue to receive a higher payment to reflect the higher costs of living on
the islands. 
Activity Programme
2.12 The activity programme is led by Connected Communities Community Empowerment
and Youth Services Teams with support from Facilities Management, Active Schools,
Information and Culture, KA Leisure and community partners. The programme of food
and activities was co-created with our community partners to ensure there were no
barriers to access.  This new model allowed us to work closely with community partners
and develop the 2022 summer programme based on the experience of the development
of delivery during Easter 2022.   
19

Page 20

2.13 A joint review with partners of the initial year of delivery, and associated capacity,
resulted in an ongoing commitment by community partners to deliver activity and food
programmes as a priority during extended summer holiday holidays. As such, it has
been proposed that activity programmes during the summer holiday periods be
resourced and prioritised and that during Easter, October, Christmas and February
holidays direct payments will be made. 
2.14 Specific arrangements will be developed for the islands and rural communities utilising
the local libraries as bases.  Connected Communities staff will work with colleagues and
local community partners to develop a programme of events and activities on both
islands and rural communities in order to maximise local resources and broaden the
scope of activities. 
2.15 Following feedback from the Easter and Summer 2022 sessions, we plan to continue
providing hot soup and packed lunches as this offers the flexibility for outdoor eating
and activities or for local trips to be undertaken. 
2.16 Community partners continue to be supported by Locality Officers to build their
resilience for their delivery of community activities. Last year's pre summer training
sessions for staff and community partners were well received and will be delivered again
this year as further support to the integrated teams. In addition, sports and arts
resources will be supplied. The partners and venues for the four-week summer 2023
programme will be finalised and communicated to elected members and residents early
in June 2023 in order to ensure that promotion and uptake is maximised. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Approves the approach to the future use of the Scottish Government holiday meals
funding as proposed in this report;
b) Approves a summer programme of activities and food in localities to be designed
with community partners; and
c) Approves the replacement of shopping vouchers with a cash first approach for families
with an assessed entitlement to free school meals. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Funding of £0.712m has been provided for school holidays meals during 2023/24. It is
expected that this funding allocation will be expended via cash payments and the
summer food and activity programme in July. 
Human Resources 
4.2 Connected Communities, Community Empowerment team will work with partners to
ensure resources are available and the summer programme can run as proposed. 
Legal 
4.3 None
20

Page 21

Equality/Socio-economic 
4.4 Scottish Government funding is targeted to address inequalities. The guidance on use
of the funding is for all children and young people, eligible for free school meals on the
basis of low income, in primary and secondary schools. 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 The proposal contained within the report supports the North Ayrshire Council Plan
priorities: 
• Active and strong communities;
• Children have the best start in life;
• Inclusive, growing and enterprising local economy; and
• People enjoy good life-long health and wellbeing. 
Community Wealth Building 
4.7 The summer programmes support the following pillars of community wealth building: 
• Creating volunteering and skills development opportunities;
• Advancing community enterprises; and
• Supporting local businesses. 
5. Consultation 
5.1 Discussions have taken place with key partners and other council services. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Carolyn Hope, Senior Manager Facilities
Management on carolynhope@north-ayrshire.gov.uk. 
Background Papers
0
21

Page 22

22

Page 23

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Access to information rights in Scotland: a consultation 
Purpose:  To seek approval for the proposed North Ayrshire Council
submission to the Scottish Government’s Consultation on
access to information rights in Scotland. 
Recommendation:  That Cabinet approves the submission of the proposed
consultation response provided at Appendix 2. 
1. Executive Summary 
1.1 The Scottish Government has launched a Consultation seeking views on access to
information rights in Scotland. The Consultation paper is provided at Appendix 1.
Views are sought by 14 March 2023, however the Scottish Government has confirmed
that they will accept a later response to allow time for the proposed response to be
considered by Cabinet. This report summarises the key features of the consultation
and seeks approval for the proposed response to the Consultation as provided at
Appendix 2. 
2. Background 
2.1 At the Cabinet meeting on 21 February 2023, members approved a draft response to
Katy Clark MSP’s Consultation on the proposal for a Bill to reform Freedom of
Information legislation in Scotland. The Scottish Government is conducting a separate
consultation on possible reforms to access to information rights in Scotland as
contained in the Freedom of Information (Scotland) Act 2002 (FOISA) and the
Environmental Information (Scotland) Regulations 2004 (EIR). 
2.2 The Scottish Government’s Consultation was precipitated by a report published by the
Public Audit and Post Legislative Scrutiny Committee (the “Committee”) in May 2020,
which recommended that there was a need for further public consultation in various
areas. 
2.3 The Scottish Government is of the view that the access to information rights
framework in Scotland is fundamentally sound, but they wish to gain a better
understanding of how it is operating in practice. The Scottish Government has
indicated that where possible it wishes to identify opportunities to improve the
operation of the regime within the existing legislative framework, for example by
strengthening and clarifying guidance and codes of practice. It also seeks evidence
and views in respect of any changes needed to the legislation in future. 
Agenda Item 5
23

Page 24

2.4 There are four key areas upon which the Scottish Government is consulting: 
2.4.1 The first is the agility of the regime in terms of maintaining and strengthening access
to information rights in the context of varied models of service delivery. The Scottish
Government notes that the Committee raised concerns about the dilution of
information rights by outsourcing public services and ancillary services (i.e. internal
services within an authority, such as cleaning of its offices) to private bodies that are
not subject to freedom of information laws. The Scottish Government notes that there
are existing safeguards to prevent outsourcing leading to a loss of information rights,
specifically: 
• Under section 5 of FOISA Scottish Ministers can extend the freedom of information
regime to cover persons or bodies that exercise functions of a public nature or that
provide, under a contract with a Scottish public authority, a service whose provision
is a function of that authority. This power has already been used, for example, to
extend the Act to cover Housing Associations and organisations delivering culture
and leisure services on behalf of local authorities (such as KA Leisure). 
• Under section 4 of FOISA Scottish Ministers can add further entities to the list of
public authorities captured by the Act, provided they meet the definition of a Scottish
public authority under the Scotland Act 1998. 
• The Code of Practice for Scottish public authorities includes advice to ensure that
when outsourcing services there is no resulting reduction in the public’s right to
access information, for example by ensuring that the contract stipulates what
information may need to be disclosed. 
• The principle of transparency is embedded in procurement legislation, which ensures
that a large volume of information about public contracts is available publicly. 
2.4.1.1 The Committee made various recommendations to address these issues,
including the introduction of a “Gateway Clause” to the legislation. The purpose of
such a clause would be to bring bodies carrying out public functions or in receipt of
significant public funds within the scope of FOISA in relation to those elements of the
organisation concerned with the provision of those services or spending of such
funds. This would bring certain bodies automatically within the scope of FOISA
depending on their functions and/or funding. There are also proposals to provide a
clearer legislative steer about when information held by contractors about the delivery
of public services and/or ancillary services is to be considered “held” by the
contracting authority for the purposes of FOISA and EIR. The Committee also
recommended that FOISA be amended to prevent reliance on confidentiality clauses
between public authorities and contractors providing public services. The Scottish
Government notes the importance of ensuring that there are measures within the
legislation to allow for the protection of commercial interests, subject to the public
interest test, and is of the view that it is rare that confidentiality clauses are used in a
way that affects the discharge of a public authority’s functions under FOISA. 
2.4.2 The second is developments in Information Technology, in particular ensuring access
to information rights in the face of changing modes of information use. Here, the
Scottish Government notes concerns raised by the Committee that the use of
unofficial platforms such as WhatsApp and private email addresses could lead to
information being overlooked when responding to a freedom of information request.
The Scottish Government notes that, legally, it is already clear that relevant
24

Page 25

information stored on such platforms falls within the scope of the existing legislation,
but that stronger guidance may help to raise awareness of this. 
2.4.3 The third is improving proactive publication and promoting openness as “business as
usual” in a digital age. Currently, FOISA requires each authority to adopt and maintain
a publication scheme setting out information to be published by that authority.
Authorities have a duty to publish the information set out in their publication scheme.
The Commissioner has developed a model publication scheme which sets out broad
categories of information to be published. The model scheme has been adopted by
most if not all public authorities, including North Ayrshire Council. The Committee
recommended that the Scottish Government consult on a proposal that the current
statutory duty to maintain a publication scheme be replaced with a statutory duty to
publish information, supported by a new legally enforceable Code of Practice on
Publication. The Scottish Government is open in principle to this idea and are of the
view that it would likely be appropriate for any new Code to be prepared by the
Commissioner. The Scottish Government has however expressed doubts that such a
Code could be legally enforceable as it would not have the status of legislation. 
2.4.4 The fourth is technical and other issues, all with a view to ensuring that the Act
remains fit for purpose. The Consultation document sets out several proposals made
by the Committee in this regard, for example that: 
• Fees charged under FOISA be calculated by estimating the staff time involved in
responding to a request, rather than the current method of estimating the cost of
compliance. 
• Where an authority does not hold the information requested in a freedom of
information (“FOI”) request but believes that another authority may do so, they
should have powers to transfer the request to that other authority, in the same
manner as is allowed under the EIR. 
• Where an authority requests more information from a requester to enable it to
respond to a FOI request, the 20 working day “clock” should be paused and
restarted when the information is provided. Currently the legislation allows for the
20 working day clock to reset when the requested information is provided.
• FOISA be amended to provide that exemptions should be interpreted in a
restrictive way and there should be a presumption in favour of disclosure.
• Where the Commissioner has issued a Decision Notice and a public authority fails
to comply with its terms within the specified time limit, the matter can be referred to
the Court of Session. Currently, only an outright failure to comply with a Decision
Notice can be referred to the Court of Session, and no further action can be taken
if an authority has complied with a Decision Notice late.
• The definition of “information” in FOISA be amended to exclude environmental
information, which is instead disclosable under the EIR. 
3. Proposals 
3.1 That Cabinet approves the submission of the proposed consultation response
provided at Appendix 2. 
4. Implications/Socio-economic Duty 
Financial 
25

Page 26

4.1 Some proposals under consideration may lead to financial implications depending on
whether and how they are taken forward. For example, if a legally enforceable Code of
Practice was introduced there may be financial penalties for non-compliance. 
Human Resources 
4.2 None at this stage. 
Legal 
4.3 The Consultation may lead to amendments to the existing legislation and/or the
supporting Guidance and Code of Practice. Should any amendments be made then
changes may be required to the Council’s policies and procedures to ensure our
continued compliance. 
Equality/Socio-economic 
4.4 None at this stage. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Robust FOI processes support the Council’s priority of being accessible and putting
residents and communities at the heart of what we do. 
Community Wealth Building 
4.7 Not applicable. 
5. Consultation 
5.1 Once the responses to the Consultation have been received and analysed, the Scottish
Government will provide a formal response to the consultation setting out the next steps
and in particular whether it intends to introduce a Bill to make any amendments to
FOISA. Any such Bill would be subject to further full public consultation. The Scottish
Government will also continue to engage widely on the development of access to
information rights within the existing statutory framework. 
Aileen Craig
Head of Democratic Services 
For further information please contact Raymond Lynch, Senior Manager (Legal
Services), by email to raymondlynch@north-ayrshire.gov.uk or by telephone, on
07799199641. 
Background Papers
None.
26

Page 27

Proposed Response to Consultation on Access to Information Rights in Scotland 
North Ayrshire Council is committed to the principles of openness and transparency
and welcomes proposals to modernise FOI legislation in Scotland to better reflect
these principles. The Council welcomes the opportunity to comment on the
proposals at this early stage and looks forward to providing further feedback on any
more concrete proposals which may be developed in future.
The Council has experience of receiving requests for information relating to
“outsourced” services. In these cases, the requested information has been provided
by the Council insofar as this is required under FOISA / EIR. In the Council’s
experience the correct application of the rules under the current regime does enable
members of the public to access information about outsourced public and ancillary
services via the designated authority. The Council’s view is that the current
legislation is sufficient clear in terms of what information is subject to a duty to
disclose, and that any ambiguity is likely to be better addressed by stronger
guidance than by legislative reform.
The Council is regularly asked to provide information held by contractors and is
comfortable assessing when such information is to be treated as being held on the
Council’s behalf for the purposes of FOISA and the EIRs. However, stronger
guidance in this area would be welcomed, both in relation to public and ancillary
services. 
In principle the Council would welcome further use of the Scottish Government’s
section 5 powers to extend coverage of the Act where appropriate. In cases where
both the local authority and another body designated under section 5 have access to
the same information, the Council would welcome clear guidance on the best
approach to responding to duplicate FOI/EIR requests in order to avoid
disproportionate expense to the public purse.  
The Council does not have a strong view on whether a hard distinction should be
drawn between “public” and “ancillary” services delivered under contract in any
future guidance but welcomes the Scottish Government’s stated approach of being
mindful of proportionality.
If a Gateway clause were introduced to the legislation, the Council would welcome a
proportionate approach to ensure that small and medium-sized enterprises and third-
sector organisations are not deterred from contracting with public authorities. The
Council is not best placed to comment on the specific implications of such
organisations being caught by any Gateway clause but would be keen that the views
of the relevant sectors are taken into account when considering this proposal further. 
In relation to confidentiality clauses, the Council is of the view that section 36 of
FOISA strikes an appropriate balance between the duty to disclose information and
the competing rights to confidentiality which may arise for a variety of reasons. It is
noted that the exemption at section 36(1) is subject to the public interest test, and
the exemption in section 36(2) only applies to information obtained by a Scottish
public authority from another person, the disclosure of which would constitute an
actionable breach of confidence (for example because it would result in losses being
27

Page 28

sustained by a third party). A confidentiality clause alone is not sufficient to restrict
the disclosure of information: in each case, a public authority is required to carry out
an independent assessment of the circumstances before deciding whether the
exemption applies. If there are concerns that confidentiality clauses are being used
to refuse to release information inappropriately this issue might be more
appropriately dealt with by raising awareness of the current legislation, rather than
amending it. It is appropriate that some commercially sensitive information should
remain confidential and the Council would therefore oppose any amendment of the
legislation to impose an outright ban on confidentiality clauses. The current system
which allows for discretion to be applied to individual circumstances is preferable. 
The Council is not aware of any specific instances where access to information has
been frustrated due to the information being held by a company wholly owned by a
combination of authorities. We would have no objection in principle to the wording of
section 6 of FOISA being amended to ensure that all companies wholly-owned by
any combination of schedule 1 authorities fall within the definition of a “publicly-
owned company”. 
North Ayrshire Council is aware that the current legislative framework requires
disclosure of information held on unofficial platforms in certain circumstances. It
would have no objection to the Code of Practice being updated to provide explicit
guidance on mitigating the risks associated with any use of unofficial platforms. It is
not considered necessary to amend the definition of “information” within the
legislation to achieve this outcome. 
The proposals to introduce a “legally enforceable” Code of Practice on publication
are noted. North Ayrshire Council is committed to accountability and transparency
and seeks to proactively publish more information than is strictly required in terms of
the model publication scheme. In principle the Council welcomes any measures to
increase accountability and transparency. We would however invite the Scottish
Government to give careful consideration to ensuring that any penalties for failure to
comply with such a Code would not put undue pressure on the public purse. The
Council’s preference would be to retain the current arrangements, subject to any
modifications of the model publication scheme that may be made from time to time. 
In general, North Ayrshire Council welcomes measures to simplify the process of
requesting information. The proposals to amend FOISA and the fees regulations to
permit authorities to estimate cost of compliance in terms of staff time rather than
financial cost are welcome insofar as they may make the process easier to
understand for those requesting information. In practice, the Council very rarely
elects to charge for information. 
In practice, North Ayrshire Council has been cautious to utilise the power to transfer
requests under the EIRs regime due to concerns about data protection, and
generally favours signposting requesters to the authorities most likely to hold the
requested information. In this regard the Council has no strong views on introducing
a similar provision into FOISA to allow the transfer of requests between authorities.
28

Page 29

North Ayrshire Council would have no objection to amending FOISA to ensure that
the “clock” is only paused, not reset, from the date clarification is requested. It has in
fact been North Ayrshire Council’s practice to treat the clock as being paused in
these circumstances anyway. Similarly, the Council endeavours to adopt a restrictive
interpretation of exemptions and a presumption in favour of disclosure whenever
dealing with a FOI request, and would have no objection to this requirement being
made explicit in the legislation. 
In principle, the Council would have no objection to harmonising the approach taken
to late compliance with Decision Notices, Information Notices and Enforcement
Notices by allowing the Commissioner to refer late compliance with a Decision
Notice to the Court of Session. 
The Council would have no objection to an amendment to the definition of
“information” to specifically exclude environmental information. While it is not
anticipated that such a change would materially affect the manner in which requests
for environmental information under FOISA are dealt with, it is acknowledged that
this amendment may improve clarity for those requesting information. 
29

Page 30

30

Page 31

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Revenue Budget 2022/23 : Financial Performance to 31
January 2023 
Purpose:  To advise Cabinet of the financial performance for the Council
at 31 January 2023. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) approve the earmarking of £1.361m identified at 2.5 to
meet future year commitments;
(c)  note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; 
(d)  note the current projected deficit position of KA Leisure;
and 
(e)  approve the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2022/23 were approved by Council on 2
March 2022. The Housing Revenue Account (HRA) Revenue Budget for 2022/23 was
approved by Council on 16 February 2022. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the fourth report for 2022/23 and covers the period to the end of January
2023 (Period 10). Projections have been made to the year-end. 
1.3   At Period 10 the General Fund is forecasting a net in-year underspend of (£0.923m),
(0.2%), after transferring resources to/from earmarked reserves. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£0.239m),
(0.4%). 
Agenda Item 6
31

Page 32

1.5  At the end of January 2023, the Health and Social Care Partnership is projecting a
year-end underspend of (£1.181m) for 2022/23, an increase of (£1.104m) from the
previously reported position. The Council services element is reporting a projected
underspend of (£1.541m), which is a movement of (£1.670m) from the previously
reported overspend. This has been partly offset by a projected overspend in relation
to the Health services element of £0.360m, which is a movement of £0.566m over the
same period. 
1.6 KA Leisure has indicated a projected trading deficit of £0.191m for 2022/23. It is
anticipated that the additional financial support to KA Leisure will be drawn from
previously approved earmarked funds. 
1.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to energy costs and essential commodities, including food and
vehicle fuel, and the full impact of the 2022/23 teachers’ pay settlement. These
pressures are likely to be offset in the short term by reductions arising from the
industrial action by teacher unions. The financial impact of the industrial action up to
the end of January 2023 has been included within the current projections. However,
the industrial action during February and March will impact on this position further and
this will continue to be assessed and quantified. The net impact of these in terms of
the utilisation of Council reserves and knock on effect on future budget gaps will
continue to be monitored and reported to Cabinet as appropriate. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2022/23. In addition to the budget approved
on 2 March 2022, earmarked funds of £31.875m were carried forward from 2021/22
for service expenditure in 2022/23 and are reflected in the figures within the 2022/23
financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year underspend of (£0.923m),
(0.2%), net of transfers to/from reserves, is anticipated for the year to 31 March 2023.
This is an increase of (£0.875m) over the previously reported position.  
32

Page 33

2.3 Details of the current financial projections are summarised in the following table: 
2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that included in the approved budget, as detailed in the
following table: 
Appendix
No
Annual
Budget
Projection
to  31
March 2023
Projected
Variance
for year
(Fav)/Adv
Projected
Variance @
Period 8 
(Fav)/Adv Movement Note
Service Expenditure £000's £000's £000's £000's £000's
Chief Executives 1 20,614     20,220      (394)        (44)             (350)        (i)
Communities 2 176,681   173,459     (3,222)      (2,122)        (1,100)      (ii)
Place 3 52,843     55,039      2,196       2,846         (650)        (iii)
Other Corporate Services 4 31,487     28,288      (3,199)      (3,074)        (125)        (iv)
Sub Total 281,625   277,006     (4,619)      (2,394)        (2,225)     
Health and Social Care
Partnership 8 118,859   118,859     -              -                -              2.6
Balance for Services 400,484   395,865     (4,619)      (2,394)        (2,225)     
Financing Charges 5 12,366     12,366      -              -                -             
Contribution to Loans Fund
Reserve 5 3,631       3,631        -              -                -             
Total Planned Expenditure 416,481   411,862     (4,619)      (2,394)        (2,225)     
Planned Income
Aggregate External Finance 5 (347,331)  (347,331)    -              -                -             
Council Tax 5 (62,100)    (62,066)     34           45              (11)         
Use of Earmarked Funds 5 (7,050)      (7,050)       -              -                -             
Total Planned Income (416,481)  (416,447)    34           45              (11)         
Net Expenditure/ (Income) -              (4,585)       (4,585)      (2,349)        (2,236)     
Carried Forward Funds -              3,662        3,662       2,301         1,361      
Revised Net Expenditure/(Income) -              (923)          (923)        (48)             (875)       
Non Domestic
Rates
Specific
Grants TOTAL AEF
Planned Income £000's £000's £000's
Approved Budget 30 November 2022 (287,267)       (37,575)         (21,259)         (346,101)      
Movements:
Music Tuition Charging Revision 27                27               
Scottish Child Bridging Payments (1,005)           (1,005)          
DHP - Benefit Cap and Admin (76)               (76)              
Educational Psychologists (23)               (23)              
Additional Teacher Induction Funding (207)             (207)            
CTR Data Extraction Funding (9)                 (9)                
NDR - ALEO Adjustment 63                63               
-                  
Revised Planned Income (288,560)       (37,512)         (21,259)         (347,331)      
General Revenue
Grant
£000's
33

Page 34

2.5 Commentary on Significant Movements from the Approved Budget 
The Council's overall financial forecast against the revised budget is a net breakeven
position. Although this is consistent with the previously reported position, it includes a
number of movements at a service level. A brief explanation of the significant
movements from the previous forecasts are outlined as follows: 
(i) Chief Executive’s – underspend of (£0.394m), an increase of (£0.350m) from
the previously reported underspend. 
The movement since Period 8 is primarily related to: 
• Reduced expenditure on software licenses, (£0.163m);
• Increased net income linked to Licensing and ICT hardware disposals,
(£0.067m); and
• Vacancy management across services, (£0.036m). 
It is requested that £0.233m of the projected underspend is earmarked to support
anticipated additional expenditure during 2023/24, including: 
• ICT LAN and Telephony projects and reinvestment, £0.166m;
• Democratic Services pressures, £0.034m; and
• Contributions to non-recurring 2023/24 savings proposals across ICT and
Democratic Services, £0.033m. 
(ii) Communities – underspend of (£3.222m), an increase of (£1.100m) from the
previously reported underspend. 
The movement since Period 8 is primarily related to: 
• Impact of industrial action by Teachers, (£0.515m);
• Lower than anticipated expenditure on Early Learning and Childcare funded
providers due to a lower than anticipated uptake of places, (0.500m);
• Vacancy management across services, (£0.272m); and
• Lower than anticipated expenditure on food costs and Early Learning and
Childcare provision within Facilities Management, (£0.105m). 
These have been partly offset by: 
• Increased residential childcare and external day placements, £0.273m. 
It is requested that a further £0.988m is earmarked to support anticipated additional
expenditure during 2023/24, including: 
• The ongoing implementation of the expansion of ELC to 1140 hrs, £0.625m; 
• £0.150m from the Cost of the School Day budget due to procurement delays;
• £0.075m to support the Easter Study Support programme;
• £0.058m to support a newly qualified Educational Psychologist;
• £0.040m in relation to the purchase of resources for Marress House; and 
• Minor adaptations within Cunninghame House and St Peters Primary, £0.040m. 
34

Page 35

The current employee cost projections include the impact from industrial action in
support of the national teacher pay settlement with total underspends of £0.793m
arising from the 5 days of industrial action between 24 November 2022 and 17
January 2023. These projections will be further updated for the industrial action on
28 February and 1 March 2023, once the cost impacts have been quantified. 
Virements in relation to the additional Community Mental Health grant income
have been included within Appendix 7. 
(iii) Place – overspend of £2.196m, a reduction of £0.650m from the previously
reported overspend. 
The net movement since Period 8 is primarily related to: 
• Vacancy management across services, (£0.488m);
• Additional Building Warrant income , (£0.279m);  
• Increase fees & charges income within Roads, (£0.072m); and
• Increased net income within Waste Services, (£0.059m). 
These have been partly offset by additional costs within Streetscene in relation to: 
• Additional overtime and the extension of seasonal worker contracts, £0.148m;
• Increased materials and costs for the erection of Christmas lights, £0.047m;
and 
• Increased contractor costs for essential cemetery work, £0.046m. 
It is requested that a further £0.140m is earmarked to support anticipated additional
expenditure during 2023/24, including: 
• £0.080m to support the Sustainability agenda, including the Solar PV projects;
• £0.035m to support Community Wealth Building activities during 2023/24; and
• £0.025m in relation to the Rapid Rehousing Transition Plan. This is in addition to
the previously earmarked £0.096m and is linked to the 5 year RRTP delivery
programme. 
Virements in relation to the realignment of income from other services budgets
within Roads, reflecting revised projections, have been included within Appendix 7. 
(iv) Other Corporate Items – underspend of (£3.199m), an increase of (£0.125m)
from the previously reported underspend. 
The movement since Period 8 is primarily related to a revised drawdown from
centrally held funds in relation to CTR claims, (£0.095m). 
The revised net underspend has been applied to offset the net overspend
reported within Place. 
35

Page 36

Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of January 2023 is
attached at Appendix 8. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised below: 
• The projected outturn is a year-end underspend of (£1.181m) for 2022/23.
• The projected underspend on the Council Services element is (£1.541m) over the
same period. This is partly offset by a projected overspend on the Health Services
element of £0.360m;
• The main areas of risk identified include:
 High risk areas of low volume / high-cost services areas e.g. Learning
Disability care packages, children’s residential placements and complex care
packages;
 Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this;
 Ongoing implementation costs of the Scottish Government policy directives;
 Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs;
 The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas;
 The impact and implementation of the National Care Service;
 The NHS pay award has been settled for 2022-23 but confirmation of
additional Scottish Government funding is awaited;
 The current extremely high levels of inflation;
 The review of the Care at Home service which commenced in Spring 2022;
 Supported Accommodation - funding has been included in the budget for the
new developments but the adequacy of the funding will only be known when
the final occupants are agreed;
 Fire dampener compensation (Woodland View) – the final level of
compensation has still to be agreed and the £0.306m previously assumed in
the projection has been removed due to the uncertainty surrounding this. 
Arrangements have been made for the full repayment of the £2.320m outstanding
debt to North Ayrshire Council during the current year. 
Risks 
2.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to energy costs and essential commodities, including food and
vehicle fuel. A total of £1.666m has been drawn down from earmarked reserves to
offset the additional inflationary pressures identified across services to 31 January
2023. In June 2022, Cabinet agreed to earmark £1.888m from the 2021/22
underspend to address unbudgeted inflationary pressures arising from the current
cost of living crisis. Any further increases beyond current budget provision may impact
on future service provision. 
36

Page 37

It is anticipated that agreement on the 2022/23 Teachers’ pay settlement will be
confirmed soon. However, the final impact of any award in excess of that agreed by
local government workers may require the utilisation of Council reserves, with a knock
on effect on future budget gaps. These pressures are likely to be offset in the short
term by reductions arising from the industrial action by teacher unions. However, the
full impact of further industrial action during February and March cannot be quantified
at this time. The net risks arising from the settlement will continue to be monitored and
reported to Cabinet as appropriate. 
Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2022/23 and an
in-year underspend of (£0.239m), (0.4%), is currently anticipated for the year to 31
March 2023. This is a reduction of £0.578m from the previously reported position. The
projected position is summarised in the following table with further details provided in
Appendix 6. 
2.9 Commentary Significant Movements from the Revised Budget 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Employee Costs – breakeven position, a reduction of (£0.107m) from the
previously reported overspend 
The movement is primarily related to vacancy management across the service. 
(ii) Property Costs – overspend of £1.561m, an increase of £0.420m from the
previously reported overspend 
The movement is primarily related to increased expenditure on Planned and
Cyclical Maintenance, £0.164m, and Other Property Costs, £0.361m, which is
primarily related to Sheltered Housing utilities, partly offset by reduced
Responsive Repairs, (£0.109m).
Annual
Budget
Projection to 
31 March
2023
Projected
Variance for
year
(Fav)/Adv
Previous
Variance @
Period 8       
(Fav)/Adv Movement Note
£000's £000's £000's £000's £000's
Employee Costs 5,279        5,279          -                  107            (107)          (i)
Property Costs 18,878      20,439        1,561           1,141          420           (ii)
Supplies and Services 451          331             (120)             (126)           6             
Transport and Plant Costs 34            24              (10)              (9)               (1)            
Administration Costs 1,874        1,790          (84)              (109)           25            
Third Party Payments 2,550        2,699          149              198            (49)           
Transfer Payments 155          155             -                  -                 -              
Other Expenditure 368          332             (36)              -                 (36)           
Capital Financing 24,692      22,624        (2,068)          (2,068)         -              
Gross Expenditure 54,281      53,673        (608)             (866)           258          
Income (54,281)     (53,912)       369              49              320           (iii)
Net Expenditure -               (239)            (239)             (817)           578          
37

Page 38

(iii) Income – underrecovery of £0.369m, an increase of £0.320m from the
previously reported underrecovery
The movement is primarily related to updated income forecasts highlighting
reduced rent recovery of £0.267m and reduced income from recharges and other
income of £0.053m. 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(c) note the information and financial projections outlined in the report; 
(d) approve the earmarking of £1.361m identified at 2.5 to meet future year
commitments;
(c)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; 
(d) note the current projected deficit position of KA Leisure; and 
(e)  approve the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 31 January 2023 is a net underspend of
(£0.923m). 
Housing Revenue Account
The net projection for the year as at 31 January 2023 is a net underspend of
(£0.239m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
38

Page 39

Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2022/23 : Financial Performance to 30 November 2022 - Cabinet 24
January 2023
39

Page 40

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 193              198              5                     3%
Total for Chief Executive 193              198              5                     3%
Financial Services
Change Programme 79                79                -                      0%
Audit, Fraud, Safety & Insurance 655              663              8                     1%
Corporate Procurement 971              822              (149)                (15%) 1         
Financial Services 1,387           1,370           (17)                  (1%)
Revenues (531)             (524)             7                     (1%)
Transformation 712              721              9                     1%
Total for Financial Services 3,273           3,131           (142)                (4%)
People & ICT
Employee Services 894              884              (10)                  (1%)
HR & Organisational Development 1,138           1,123           (15)                  (1%)
ICT 5,318           5,141           (177)                (3%) 2         
Business Support 1,259           1,259           -                      0%
Customer Services 4,736           4,739           3                     0%
Total for People & ICT 13,345         13,146         (199)                (1%)
Democratic Services
Legal & Licensing 461              481              20                   4% 3         
Policy, Performance & Elections 473              432              (41)                  (9%) 4         
Communications 463              453              (10)                  (2%)
Civil Contingencies 60                60                -                      0%
Committee Services 554              554              -                      0%
Member Services 1,334           1,338           4                     0%
Ayrshire Support Service 54                54                -                      0%
Information Governance 404              373              (31)                  (8%)
Total for Democratic Services 3,803           3,745           (58)                  (2%)
Totals 20,614         20,220         (394)                (2%)
Less Proposed Carry Forwards 233              233                
Net Total 20,614         20,453         (161)                (1%)
40

Page 41

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 16,490         16,236         (254)                (2%)
Property Costs 68                68                -                      0%
Supplies and Services 3,099           2,947           (152)                (5%)
Transport and Plant Costs 31                30                (1)                    (3%)
Administration Costs 1,367           1,355           (12)                  (1%)
Other Agencies & Bodies 2,948           2,948           -                      0%
Transfer Payments 817              817              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 24,820         24,401         (419)                (2%)
Income (4,206)          (4,181)          25                   (1%)
Net Expenditure 20,614         20,220         (394)                (2%)
41

Page 42

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement : There has been a favourable movement of £0.009m since P8 primarily due to additonal vacancy
management and increased rebate income.
957 (133) -14% Employee Costs - There is an underspend of £0.113m due to vacancy management.
(108) (24) 22% Income - There is an over recovery of £0.024m due to increased rebates.
- 8 Other minor variances
(149)
Note 2 People & ICT - ICT
Movement - There has been a favourable movement of £0.175m from P8 due to £0.163m software licence
underspends and £0.014m over-recovery of income.
2,280 (163) -7%
Supplies and Services - There is an underspend of £0.163m in software licences due to some contracts not being
renewed and national delays in procuring a collective Security Operations Centre (SOC); a one-off reduction in cost for
the O365 backup solution; and delays in delivery of WAN upgrade, planned bandwidth increases will incur increased
WAN charges in 2023/24.
- (14) Income - There is an over-recovery of £0.014m in income from IT hardware, the proceeds of which are being requested
for earmarking for reinvestment.
It is proposed to earmark funds of £0.014m for reinvestment, and £0.152m for ICT LAN and Telephony Project
Resource requirements linked to the delivery of digital telephony in line with the 2025 national digital switch off.
In addition an earmarking request of £0.010m is required for People & ICT's contribution to the 2023/24 savings
targets.
(177)
Note 3 Democratic Services - Legal & Licensing
Movement : There has been a favourable movement of £0.053m since P8 which relates mainly to an increase in
Licensing income forecasts and specifically Landlord Registration, Civic Government Taxis and Civic Government
Others. These are based on current and prior year trends and have now therefore been updated with actual Licensing
income information for 22/23 up to P10.
(717) 25 -3% Income : Projected under-recovery of £0.025m due to under-recovery in Licensing income based on current and prior
year trends.
(5) Other minor variances
20
Democratic Services - Policy, Performance & Elections
Movement - There has been a favourable movement of £0.027m from P8 due to additional vacancy management.
427 (41) -10% Employee Costs - There is an underspend of £0.041m due to vacancy management.
It is proposed to earmark funds of £0.034m to cover anticipated staff pressures due to increasing work levels to be
addressed.
In addition an earmarking request of £0.023m is required for Democratic Services' contribution to the 2023/24 savings
targets.
(41)                 
Note 4
42

Page 43

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 20,579         19,971            (608)                (3%) 1         
Primary Education 45,092         44,646            (446)                (1%) 2         
Secondary Education 56,427         56,241            (186)                (0%) 3         
Additional Support Needs 12,957         13,012            55                   0% 4         
Education - Other 5,125           4,038              (1,087)             (21%) 5         
Pupil Equity Fund 5,414           5,414              -                      0%
Facilities Management 17,775         16,825            (950)                (5%) 6         
Connected Communities 13,312         13,312            -                      0% 7         
Net Total 176,681       173,459          (3,222)             (2%)
Less Proposed Carry Forwards 2,184              2,184             
Net Total 176,681       175,643          (1,038)             (1%)
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 89,557         88,848            (709)                (1%)
Employee Costs - Non Teachers 58,794         56,674            (2,120)             (4%)
Property Costs 1,681           1,838              157                 9%
Supplies and Services 23,529         22,883            (646)                (3%)
Transport and Plant Costs 193              234                 41                   21%
Administration Costs 622              601                 (21)                  (3%)
Other Agencies & Bodies 13,651         13,499            (152)                (1%)
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 78                78                   -                      0%
Gross Expenditure 188,685       185,235          (3,450)             (2%)
Income (12,004)        (11,776)           228                 (2%)
Net Expenditure 176,681       173,459          (3,222)             (2%)
43

Page 44

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been a favourable movement of £0.545m compared to P8. This is mainly due to a projected
underspend in payments to Funded Providers.
16,005 (68) 0% Employee costs: £0.068m due to continuing recruitment gaps and vacancy management across the sector
549 (40) -7% Supplies & Services: underspends across budgets
4,311 (500) -12% Third Party Payments: a projected underspend of £0.500m in payments to Funded Providers mainly due to lower uptake
of places against anticipated projections.
It is requested to earmark £0.040m of the supplies & services underspends to purchase resources for the new Marress
House and the remaining £0.568m underspend for resources linked to the expansion of ELC 1140 hours carried forward
to 23/24 to help address the impact of the significant funding reduction in 23/24
(608)
Note 2 Primary Education
Movement : There has been an favourable movement of £0.071m compared to P8.  This is mainly due to continuing
recruitment gaps and vacancy management.
42,311 (552) -1%
Employee Costs : £0.552m underspend in non teaching staff costs of which £0.270m is due to a part year saving for
School Dining Supervisors who were appointed at the start of this academic year. The remainder is due to recruitment
gaps and vacancy management across all other categories of non teaching staff.
2,090 89 4% Supplies and Services :  £0.089m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
80 (28) -35% Third Party Payments: an underspend of £0.028m as less overtime required due to streamlined processes
(73) 45 -62% Income: under recovery of school let income due to school lets not fully operational
These figures do not include any implications from further industrial action as part of the national dispute over teachers’
salaries, nor resultant commitments emerging from any subsequent pay settlement. This information will be reflected in
future reports at the appropriate time.
(446)
Note 3 Secondary Education
Movement : There has been a favourable movement of £0.019m compared to P8. This is mainly due to continuing
recruitment gaps and vacancy management.
42,711 (284) -1% Employee Costs : £0.284m underspends in non teaching staff costs due to recruitment gaps and vacancy management
across all types of staff.
13,210 83 1% Supplies and Services : £0.083m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
139 (30) -22% Third Party Payments: an underspend of £0.030m as less overtime required due to streamlined processes
(79) 45 -57% Income: under recovery of school let income due to school lets not fully operational
These figures do not include any implications from further industrial action as part of the national dispute over teachers’
salaries, nor resultant commitments emerging from any subsequent pay settlement. This information will be reflected in
future reports at the appropriate time.
(186)
Note 4 ASN
Movement: There has been an unfavourable movement of £0.199m compared to P8, mainly due to increases in both
residential (£0.249m) and day placement (£0.024m) costs as additional young persons are accessing these services. 
This is partially offset by further employee costs underspends of £0.066m due to vacancy management.
10,859 (374) -3%
Employee costs: £0.108m underspend in teaching costs and a £0.266m underspend in non teaching staff costs across all
ASN school and bases provision from recruitment gaps and vacancy management across all categories of non teaching
staff.
There is an ongoing Supporting Needs review and this is due to be completed later this calendar year.
1,010 (218) -22%
There is a projected underspend of £0.218m on external day placements as a result of the assessment process currently
in place. This enables the children to remain in mainstream establishments or in-authority ASN establishments.
499 626 125%
There is a projected overspend of £0.626m on external specialist residential placements.  Currently there are 10 children
in accommodation.  Joint working is ongoing with HSCP to continually assess the care setting for these children in
delivering positive outcomes.
- 21 Other minor movements across various budget lines
It is requested to earmark £0.058m of the above employee cost underspend to be used to fund a newly qualified
Education Psychologist for a year.
55
44

Page 45

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Education Other
Movement :There has been a favourable movement of £0.507m since P8. This is mainly due to underspends in employee
costs as a result of the teachers industrial action to date, partly offset by a projected increased spend in teachers HQ
cover costs.
3,773 (649) -17% Employee costs: under recovery of teacher payroll turnover of £0.150m offset by £0.793m underspend in relation to the 5
days industrial action by teachers during Dec 2022/Jan 2023.
708 (121) -17% Supplies & Services:  small overspends of £0.029m and projected underspend of £0.150m in COSD due to procurement
tendering process to obtain best value for money.
1,410 (11) -1% Third Party Payments - small overspends across various subscriptions/licences amounting to £0.023m and underspend
of £0.110m
1,677 (312) -19% Income - PPP insurance rebate £0.075m, deductions of £0.220m in excess of budget and £0.017m salaries rec'd from
capital
6 Other minor movements across various budget lines
Request to earmark £0.150m of COSD funds due to delays in procurement process for purchase of clothing for pupils in
schools; £0.035m for Education 5th floor adaptations; £0.005m for St Peter's PS minor adaptations and £0.075m for
Easter Study Support for pupils preparing for SQA examinations
(1,087)
Note 6 Facilities Management
Movement: There has been a favourable movement of £0.159m since period 8 which is primarily due to savings of
£0.071m in employee costs, £0.048m in lower than anticipated food costs and £0.057m in Early Years.  
15,017 (569) -4%
Employee Costs: Underspend of £0.072m is due to reduced commercial catering activity.  There is an underspend of
£0.205m due to the reduced uptake of school meals.  In addition, there is an underspend of £0.272m due to recruitment
issues and reduced overtime and casual costs.
1,079 113 10% Property Costs:  Overspend is primarily in relation to purchasing cleaning materials in response to Covid-19.
4,526 (878) -19%
Supplies and services: There is a saving of £0.104m in food due to reduced commercial catering.  There are further food
savings of £0.221m due to reduced school meal uptake and £0.055m within social services.  In addition, there is an
underspend within Early Years of £0.454m which has arisen due to a lower attendance rate than originally anticipated. 
There is also a saving of £0.063m within tools and implements due to delayed opening of Moorpark Primary and reduced
commercial catering activity. 
(2,918) 359 -12%
Income: There is an under-recovery in commercial catering income of £0.543m due to a reduction in commercial events
and cost/ income challenges within commercial venues.  This is offset against an over-recovery of school meal income of
£0.081m and cleaning and janitorial income of £0.103m.
Facilities Management continue to promote the school meal service to maximise uptake.
25 Other minor movements
The Early years expansion is linked to specific grant funding provided by the Scottish Government.  It is proposed to
increase the £0.397m previously earmarked by £0.057m to £0.454m.  This is to match the current projected underspend
to the earmark request. 
(950)
Note 7 Connected Communities
Movement: There has been no change since P8.
7,834 (332) -4% Employee Costs: underspends across all sectors due to vacancy management.
1,382 199 14% Supplies and Services: anticipated increase in expenditure to part utilise the employee costs underspends  and increase
in Harbour Arts Centre events costs, which is offset with the increased income in the HAC.
5,223 (1) 0%
Third Party Payments: additional support of £0.191m will be required for NALL from the Council. This will come from the
use of previously earmarked funds totalling £0.365m which will be used to support the trading deficit position and the
renewal programme within NALL.
(1,579) 95 -6% Income: projected £0.147m under recovery across various sectors as income has not returned to pre covid levels, offset
by projected over recovery in Harbour Arts Centre of £0.052m.
- 39 Other minor movements across various budget lines.
-
45

Page 46

Appendix 3
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 186              186               -                     0%
Housing and Public Protection
Building Services (2,541)          (2,541)           -                     0% 1         
Property Governance (9)                 (9)                  -                     0%
Planning Services 290              230               (60)                 (21%) 2         
Protective Services 1,699           1,336            (363)               (21%) 3         
Other Housing 2,653           2,007            (646)               (24%) 4         
Total for Housing and Public Protection 2,092           1,023            (1,069)            (51%)
Commercial Services
Roads 6,596           7,009            413                 6% 5         
Streetscene 5,268           5,764            496                 9% 6         
Waste Resources 9,238           9,446            208                 2% 7         
Total for Commercial Services 21,102         22,219          1,117              5%
Economic Growth and Regeneration
Economic Development 4,444           4,338            (106)               (2%)
Growth & Investment 211              211               -                     0%
Total for Economic Growth and Regeneration 4,655           4,549            (106)               (2%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,463           1,541            78                   5% 8         
Housing Assets & Investment (4)                 (4)                  -                     0%
Property Maintenance 3,522           3,721            199                 6% 9         
Property Running Costs 4,725           4,766            41                   1%
Energy and Sustainability 5,486           6,551            1,065              19% 10       
Internal Transport 9,616           10,487          871                 9% 11       
Total for Sustainability, Transport and Corporate
Property 24,808         27,062          2,254              9%
Net Total 52,843         55,039          2,196              4%
Transfer to Earmarked Reserves 286               286                
Net Total 52,843         55,325          2,482             
46

Page 47

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 45,917         46,039          122                 0%
Property Costs 21,644         23,106          1,462              7%
Supplies and Services 9,839           10,273          434                 4%
Transport and Plant Costs 9,420           10,655          1,235              13%
Administration Costs 798              758               (40)                 (5%)
Other Agencies & Bodies 19,767         19,085          (682)               (3%)
Transfer Payments -                   -                    -                     0%
Other Expenditure 182              193               11                   6%
Gross Expenditure 107,567       110,109        2,542              2%
Income (54,724)        (55,070)         (346)               1%
Net Expenditure 52,843         55,039          2,196              4%
47

Page 48

Appendix 3a
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since P8 however the service are currently managing significant financial
challenges.
5,624 (1,080) (19%) Supplies & Services: An underspend of £1.080m in supplies and services. This is due to an underspend in materials as
a result of a change in the composition of the works programme.
547 48 9% Transport costs: The overspend of £0.048m in transport costs is due to increasing costs of skip hire.
2,152 924 43%
Third Party Payments: An overspend in third party payments of £0.924m. New workstreams for 22/23 have required an
above average subcontractor element. There has also been an increase in works that are wholly subcontracted due to
either labour shortages or specialist activities.
(20,153) 86 (0%)
Income: an under-recovery of income of £0.086m is anticipated due to labour and supplier issues causing delays in
completing parts of the capital programme.  This has been offset with additional income across various  revenue
income lines.
22 Other minor movements
-
Note 2 Planning Services
Movement: There has been no movement since P8.
102 (60) (59%) Supplies & Services: An underspend of £0.060m due to plans for the LDP reprofiling costs into 23-24.
(60)
Note 3 Protective Services
Movement: There has been a favourable movement of £0.263m since the last reporting period mostly due to increased
building warrant income of £0.279m.
1,749 (94) (5%) Employee Costs: An underspend of £0.094m in staffing costs due to vacancies during the year now filled with the
exception of one position and one resignation.
(710) (269) 38% Income: Over recovery of £0.279m in building warrants offset by a reduction in pest control income of £0.010m.
(94)
Note 4 Other Housing
Movement: There has been a favourable movement of £0.282m since period 8. This is mainly due to a decrease in
employee costs across the service as vacancies are now not presumed to be filled prior to year end.
4,232 (725) (17%)
Employee Costs: Underspend is due to a number of vacancies within the homeless service, this is of a temporary
nature and it is anticipated that all vacancies will be filled next financial year.  In addition to this a number of posts
transferred over to the Housing Options Hub to assist with the Ukraine Humanitarian crisis and funding for these posts
came from Scottish Government for that purpose.
2,696 74 3%
Property Costs: £0.034m of the overspend relates to Council Tax payments. This is for backdated Council Tax from the
previous two years, which is due for temporary furnished properties while they were unoccupied for a short period of
time between tenants. £0.017m overspend in Temporary Accommodation property rents as additional units have been
in use, which is offset by the additional income for these properties; £0.012m utility costs overspend due to rising
prices; and £0.011m forecasted overspend in contract cleaning.
5 Other minor movements
It is requested to earmark £0.025m of the vacancy underspend that relates to the Rapid Rehousing Transition Plan.
This is in addition to the £0.096m RRTP funding that has previously been requested to be earmarked and is linked to
the ongoing 5 year delivery programme. 
(646)
48

Page 49

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Roads
Movement: There has been a favourable movement of £0.097m since period 8, with £0.072m of the favourable
movement relating to income. In addition to this, the estimated Lighting energy cost has decreased by £0.025m based
on invoices received this year.
2,458 229 9%
Supplies and Services: Overspend of £0.107m on street lighting and traffic signal electricity costs, which is due to
inflation. Further overspend of £0.122m relates mainly to coated roadstone costs, which have been adversely affected
by inflation.
2,369 (67) (3%)
Third Party Payments: £0.125m budget allocated for the intorduction of the Car Parking Charges and Decriminalised
Parking Enforcement saving will not be incurred. The roads maintenance budget has been adversely affected by
inflationary pressures and the service is managing the programme taking account of this. However, there remains a
small overspend of £0.033m in unavoidable contractor costs. In addition to this, there is an overspend of £0.025m on
Artificial Intelligence software costs related to Asset Management.
(2,941) 201 (7%)
Income: £0.346m under recovery of income relating to the saving for Car Parking Charges and Decriminalised Parking
Enforcement, not achieved. This is partly offset with an over recovery in fees and charges and salaries recovered from
capital in Network.
50 Other minor movements.
A budget virement has been included in Appendix 7. This is to revise the income and related expenditure budgets for
work carried out for other Council Services and external parties.
413
Note 6 Streetscene
Movement: There has been an adverse movement of £0.237m since period 8. Employee costs have increased by
£0.148m due to increased overtime costs and the extension of seasonal posts to the end of March. Supplies and
Services costs have increased by £0.047m, primarily for materials and costs to erect Christmas Lights and contractor
costs have increased by £0.046m for essential cemetery work.
7,246 385 5%
Employee Costs: There is an overspend of £0.385m in employee costs, primarily due to overtime costs, which is
partially offset with increased income from other Council departments. The 2022/23 pay award didn't cover all non
scheduled over time which has impacted the budget by approximately £0.050m.  The reason overtime has increased is
due to non schedueld operational activites such as A78 litter clearance (£0.056m), various events (£0.050m), and
safety works for memorials (£0.041m). Turnover of £0.103m wasn't realised.
129 152 118% Transport Costs: There is an overspend of £0.152m in transport costs, initially due to additional vehicles required for
the Covid response, vehicles required for seasonal workers, and to support the operational needs within bereavements. 
325 64 20% Supplies and Services: £0.044m overspend against materials and £0.022m overspend for costs to erect Christmas
Lights.
72 49 68% Third Party Payments: Overspend is mainly for essential cemetery works, such as clearing grave spoil.
(2,698) (156) 6%
Income: There is an over recovery of income of £0.114m relating to internments and £0.204m relating to income from
other departments, offset with a £0.145m under recovery of fees and charges and £0.019m under recovery for Largs
Common Good charges.
2 Other minor movements
496
Note 7 Waste Services
Movement : There has been a favourable movement of £0.059m since P8 due to increased income from disposal of the
content of skips by £0.027m and reduced promotional costs of £0.025m.
4,763 826 17%
Employee Costs:  Additional temporary labour remains in place within Waste Operations as the service recovers from
the pandemic. Work to review beats taking account of post pandemic waste composition analysis and to balance the
burden of new builds is ongoing with Trade Union colleagues resulting in support arrangements being required. In
addition there is a high volume of annual leave not taken due to COVID, requiring holiday cover.
413 173 42% Supplies & Services: Overspend on Trade effluent £0.117m and Refuse containers £0.087m, offset by underspends in
Materials £0.031m.
62 (42) (68%) Admin Costs:  Underspend of £0.042m due to reduced spend on external printing and advertising.
6,382 (731) (11%)
Third Party Payments:  Underspend in Payment to contractors of £0.716m largely a result of improved quality of our
recyclate streams following sustained ‘right stuff, right bin’ campaigns alongside more competitive recyclate prices
within our disposal contracts.
201 164 82% Transport Costs: Overspend of £0.164m due to the new way of working requiring 2 additional hire vehicles plus a long
term hire. This is being reviewed in line with the post pandemic review of beats.
(2,930) (166) 6%
Income: Over-recovery of income due to the recyclates market for glass, cans, plastics and paper being favourable to
provide income rather than a cost to the council £0.119m, along with increased income from the disposal of the content
of skips over the year of £0.077m, offset by reduction in waste gas extraction of £0.052m.
(16) Other minor movements
208
49

Page 50

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 8 Economic Development
Movement:  There has been a favourable movement of £0.106m since P8 due to vacancy management.
377 (106) (28%) Employee Cost:  Underspends of £0.106m due to various vacancies across some of the services.
It is requested to earmark £0.035m of the above employee cost underspend for Community Wealth Building costs
activities in 2023/24.
(106)
Note 9 Property Management and Investment
Movement : There has been a favourable movement of £0.009m since P8.
2,351 (90) (4%) Employee Costs: An underspend of £0.090m due to vacancy management.
(8,653) 119 (1%) Income: There is an under-recovery of £0.119m in fee income.
49 Other minor movements including payment to contractors £0.025m and supplies and services £0.023m.
78
Note10 Property Maintenance
Movement : There has been no movement since P8
6,733 199 3%
Property Costs : There is an overspend of £0.144m due to external surveying works associated with supporting the
Education Estate Review.
Statutory Compliance is also showing an overspend of £0.067m.
199
Note 11 Energy and Sustainability
Movement : There has been a favourable movement of £0.100m since P8.  This is due to vacancy management.
532 (100) (19%) Employee Costs: An underspend of £0.100m due to vacancy management.
5,374 1,165 22%
Property Costs: Due to the current energy crisis and after drawing down £0.658m from contingencies there is an
overspend in property costs of £1.165m due to increased utility cost charges.  Electricity is forecast to be £0.070m
overspent, gas £0.981m over, biomass £0.109m over and water £0.005m over.
The reported overspends are after the inclusion of budgeted inflation contingencies. The remaining overspend will be
offset against the additional inflationary provisions agreed by Council which have been reported within the Other
Corporate Items appendix.                                                                                                                                                        
It is requested to earmark £0.080m to continue the sustainability agenda, supporting the proposed Solar PV projects.
1,065
Note 12 Internal Transport
Movement - There has been a favourable movement of £0.019m due to £0.028m additional over recovery of income;
£0.027m decrease in fuel costs as a result of lower fuel prices and a £0.026m reduction in employee costs due to
vacancies.  These are partially offset by an increase in forecasted repairs & maintenance cost of £0.030m; £0.018m
increase in transport provision costs; and £0.013m of projected additional external hire costs.
1,682 17 1% Employee Costs:  There is an overspend of £0.017m due to reduced staff turnover.
4,201 517 12% Transport Provision Costs: Projected overspend of £0.517m is largely due to direct fuel cost increases and indirect fuel
and labour cost increases through our school transport contracts.
1,814 247 14% Fuel Costs: This projected overspend of £0.247m is due to the increase in fuel prices and the legislative changes
restricting the use of rebated gas oil (or 'red diesel' as it is commonly referred to).
467 66 14% External Hires: Projected overspend of £0.066m due to additional hire vehicles as a result of increased lead time for
replacement vehicles.
1,123 80 7%
Repairs & Maintenance: Projected overspend of £0.080m in repairs and maintenance due to price increases and
maximising the life of assets due to the increased lead time for replacement vehicles and the shortage of available
rental alternatives.
(251) (60) 24% Income: Projected overrecovery of £0.060m in bus transport income and hire of pool vehicles.
4 Other minor movements
The reported overspends are after the inclusion of budgeted inflation contingencies. The remaining fuel price related
overspend will be offset against the additional inflationary provisions agreed by Council which have been reported within
the Other Corporate Items appendix.
871
50

Page 51

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,212 2,188 (24)               (1%)
SPT Concessionary Fares 286 286 -                   0%
Ayrshire Joint Valuation Board 975 932 (43)               (4%)
3,473 3,406 (67)               (2%) 1           
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
23,347 20,301 (3,046)          (13%) 2           
Housing Benefits 2,422           2,336           (86)               -4% 3           
31,487 28,288 (3,199)          (10%)
Less Proposed Carry Forwards 959
Net Total 31,487 28,288 (2,240) (7%)
51

Page 52

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
There has been no movement from Period 8
3,473 (67)                 -2% There is a projected underspend of £0.067m as annual requisitions confirmed at less than current budget.
(67)
Note 2 Other Corporate Items
There has been a favourable movement of £0.118m since Period 8 primarily due to a revised drawdown of previously
approved CTR budgets and additional Scottish Government funding in relation to the administration of grants.
23,347 (3,046)            -13%
The projected underspend is primarily related to the drawdown of £1.666m earmarked funds in relation to additional
contractual and non contractual energy and fuel costs reported across the services, linked to significant unbudgeted
inflationary pressures and the release of £0.552m of earmarked funds in relation to the 2022/23 pay settlement. In
addition, centrally held funds of £0.722m are not expected to be fully utilised in year, including additional Scottish
Government funding in relation to Core Curriculum Charges, changes to DHP distributions and the administration of
grants. Additional corporate income of £0.106m is anticipated in relation to the shared AVC scheme and the purchase
of additional annual leave.
These funds have been applied to offset the overspend reported within Place at Appendix 3.
(3,046)
Note 3 Housing Benefit
There has been movement of £0.007m from Period 8 due to the revised Housing Benefit overpayment recoveries.
2,422 (86)                 -4% Projected underspend of £0.086m due to the provision of Housing Benefits and overpayment recovery.
(86)
52

Page 53

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 12,366 12,366 - -
Contribution to Loans Fund Reserve 3,631 3,631 - -
Scottish Government Funding (347,331) (347,331) - -
Council Tax (62,100) (62,066) 34 (0%)
Use of Earmarked Funds (7,050) (7,050) - -
Net Total (400,484) (400,450) 34 (0%)
53

Page 54

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,279 5,279 - 0% 1
Property Costs
Responsive Repairs 5,677 6,503 826 15%
Void Repairs 3,147 3,242 95 3%
Planned and Cyclical Maintenance 4,862 4,923 61 1%
Aids and Adaptions 1,617 1,617 - 0%
Other property costs 3,575 4,154 579 16%
Total for Property Costs 18,878 20,439 1,561 2
Supplies & Services 451 331 (120) (27%) 3
Transport Costs 34 24 (10) (29%)
Administration Costs 1,874 1,790 (84) (4%) 4
Third Party Payments 2,550 2,699 149 6% 5
Transfer Payments 155 155 - 0%
Other Expenditure 368 332 (36) (10%)
Capital Financing Costs 24,692 22,624 (2,068) (8%) 6
Gross Expenditure 54,281 53,673 (608) (1%)
Income
Council House Rents (53,310) (52,708) 602 (1%)
Other Rents (326) (380) (54) 17%
Recharges (499) (637) (138) 28%
Other Income (146) (187) (41) 28%
Transfer from HRA Reserves - - - 0%
Total Income (54,281) (53,912) 369 (1%) 7
Net Expenditure - (239) (239)
54

Page 55

Appendix 6a
HRA
BUDGETARY CONTROL 2022/23
REPORT FOR THE 10 MONTHS TO 31 JANUARY 2023
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
5,279 0 0%
0
Note 2
18,878 1,561 8%
1,561
Note 3
451 (120) -27%
(120)
Note 4
1,874 (83) -4%
(83)
Note 5
2,550 149 6%
149
Note 6
24,692 (2,068) -8%
(2,068)
Note 7
(54,281) 369 -1%
369
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/23
£m £m £m £m £m £m
5.280 - - - (1.151) 4.129
1.500 - - - - 1.500
5.000 - - - - 5.000
1.558 - - - - 1.558
0.123 - - - - 0.123
0.781 - - 0.239 - 1.020
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.270 - - - - 0.270
15.616 - - 0.239 (1.151) 14.704
Income
Movement - There has been an adverse movement of £0.320m since Period 8. This is due to a reduction of
£0.259m in Council House rents, £0.008m in Rents, £0.042m in Recharges and £0.011m in other income.
An under recovery in income of £0.369m. This is due to an under recovery of £0.601m in Council House Rents
partially offset by an over recovery of £0.053m in Other Rents, £0.138m in Recharges and £0.041m in Other
Income.
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works
Section
Employee costs
There is no expected variance in employee costs.
Movement - There has been a favourable movement of £0.107m since Period 8 due to vacancy management.
Third Party Payments
Movement - there has been a favourable movement of £0.049m since Period 8. This is primarily due to a reduction
of £0.050m in Housing Asset and Investment recharges.
An overspend in third party payments of £0.149m. This is primarily due to an overspend of £0.185m in the Housing
Asset and Investment recharges partially offset by an underspend of £0.038m in the ASB & Tenancy support
charges.
Capital Financing Costs
Movement - there has been no movement since P8.
There is an underspend in capital financing costs of £2.068m due to reduced loan charges. This is due to the
reduced levels of expenditure currently being experienced in the HRA Capital budget
Property Costs
Movement - an adverse movement of £0.420m since Period 8. This is mainly due to an increase of £0.164m in
Planned and Cyclical Maintenance and £0.361m in Other Property Costs of which primarily relates to sheltered
housing utility costs, offset by a reduction of £0.109m in Responsive Repairs.
An overspend in property costs of £1.561m. This is due to an overspend of £0.826m in Responsive Repairs,
£0.096m in Void Repairs, £0.061m in Planned and Cyclical Maintenance partially related to construction inflation,
and £0.578m in other property costs of which £0.206m relates to increased Council Tax payments and £0.395 in
sheltered housing utility costs.
HRA reserves and balances
Supplies & Services
An underspend in supplies and services of £0.120m. This is primarily due to underspends of £0.080m in computer
equipment and £0.054m in software licences.
Administration Costs
Movement - there has been an adverse movement of £0.026m since Period 8.
Movement - an adverse movement of £0.006m since Period 8.
An underspend in administration costs of £0.083m. This is primarily due to an underspend of £0.105m in legal fees.
55

Page 56

Appendix 7
1) Budget Virements
Place
Roads Income T 0.158
Roads Third Party Payments T -0.158
0.000
Community Mental Health Employee Costs T 0.229
Community Mental Health Supplies & Services T 0.001
Community Mental Health Administration Costs T 0.009
Community Mental Health Third Party Payments T 0.286
Community Mental Health Grant Income T -0.525
0.000
Communities
Budget Management - 31 January 2023
Virement/Budget Adjustment Requests
2022/23
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m
56

Page 57

Official-Protect
Appendix 8 
Integration Joint Board
16th March 2023
Subject:  2022-23 – Month 10 Financial Performance
Purpose:  To provide an overview of the IJB’s financial performance as at
month 10 (January) including an update on the estimated financial
impact of the Covid-19 response.  
Recommendation:  It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for the
financial year 2022-23 and the current overall projected year-end
underspend of £1.181m;
(b) notes the progress with delivery of agreed savings;
(c) notes the remaining financial risks for 2022-23, including the
impact of remaining Covid-19 estimates and costs; and
(d) approves the budget reductions which are detailed at paragraph
2.11. 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected expenditure
and income commitments; these have been prepared in conjunction with relevant
budget holders and services.   It should be noted that, although this report refers to
the position at the end of January, further work is undertaken following the month end
to finalise projections, therefore the projected outturn position is as current and up to
date as can practicably be reported. 
1.2 The projected outturn is a year-end underspend of £1.181m (0.4%) for 2022-23.  This
includes the financial impact of the local authority pay award but excludes the NHS
57

Page 58

Official-Protect
pay award; this has been agreed but confirmation of the amount of additional Scottish
Government funding is still awaited. 
1.3 From the core projections, overall, the main areas of pressure are learning disability
care packages, residential placements for children, supplementary staff in wards and
Unplanned Activities (UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
The report also includes detail of the estimated costs and potential financial impact of
the Covid-19 response. 
FINANCIAL PERFORMANCE – AT MONTH 10 
2.2 At Month 10 against the full-year budget of £276.985m there is a projected year-end
underspend of £1.181m (0.4%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected underspend of £1.541m in social care services and a projected
overspend of £0.360m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £83.220m there is a projected underspend of £0.105m
(0.1%) which is a favourable swing of £0.527m and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£1.034m which is a favourable movement of £0.031m. 
The budgeted number of permanent placements is 778 and at month 10 there are
762 placements.  The projection assumes that the current number of placements
will continue to increase to 770 placements by the end of the year. Within the
projection there is an assumption that recent placements which do not have a
completed financial assessment (often due to the pressure to discharge from
hospital) are costed with 50% of the cases at the current average cost of a
placement and 50% at the gross or interim funded rate.  It is likely that there will
still be some cases being gross or interim funded at the year end. Their actual cost
will not be known until the FA1 financial assessment is completed and this can
impact on the final position.
58

Page 59

Official-Protect
The level of income recovered from charging orders was under recovered in 2021-
22 but an online position is assumed at month 10 as the income received to date
is in line with the target.   
b) Care at home (in house and purchased) is projected to be £0.108m underspent
which is a favourable movement of £0.112m.  The position is made up of an
underspend in purchased care at home as providers are not always able to accept
referrals due to staffing / recruitment issues and an overspend in the in-house
service.  As there are vacant posts some of the current capacity is being met by
existing staff working additional hours and casual staff.  Bank staff are being
offered contracts and additional staff are being recruited which will replace the
need for existing staff to work additional hours.   
c) Community alarms are projected to be £0.093m underspent which is an adverse
movement of £0.003m. 
d) Reablement services are projected to be £0.219m underspent which is a
favourable movement of £0.061m due to vacancies. 
e) Care at Home Charging Income is projected to under recover by £0.084m (no
movement) due to an ongoing shift towards personal care which is non chargeable.
This is after applying £0.076m of Covid funding. 
f) Physical Disability Care Packages (including residential and direct payments) -
projected overspend of £0.062m in community care packages, £0.165m in direct
payments and £0.243m for residential placements. This is an overall favourable
movement of £0.090m. 
g) Purchased day care is projected to underspend by £0.071m (no movement) due
to a revised contract. 
h) Anam Cara is projected to overspend by £0.090m which is a favourable movement
of £0.084m.   The overspend is due to covering vacancies and sickness absence.   
i) Integrated Island Services is projected to be £0.280m overspent which is a
£0.154m adverse movement.  The overspend is mainly due to additional
accommodation costs for mainland staff working at Montrose House due to local
recruitment challenges and additional agency costs to ensure the required staffing
levels. 
j) District Nursing is projected to overspend by £0.130m due to an overspend on
supplies and reduced national uplift funding. 
k) Rehab wards are projected to overspend by £0.270m (Redburn ward £0.310m
overspent and Douglas Grant £0.040m underspent), £0.058m adverse movement
from month 7.  The overspend at Redburn is due to cover costs for vacancies as
well as supplementary staffing for patients who require one to one support. 
l) Wards 1 and 2 are projected to overspend by £0.140m (ward 1 £0.060m
overspend and ward 2 £0.080m overspend) which is an adverse movement of
£0.100m due to increased use of supplementary staffing. 
59

Page 60

Official-Protect
m) Cumbrae Lodge Continuing Care beds are projected to underspend by £0.185m
which is a favourable movement of £0.185m.  This is due to a reduced charge to
reflect the reduction in beds used during the transition to the new service. 
2.4 Mental Health Services     
Against the full-year budget of £88.169m there is a projected overspend of £1.237m
(1.4%) which is an adverse movement of £0.497m. This excludes any potential
variance on the Mental Health Recovery and Renewal Funding where any underspend
will be earmarked at the year-end for use in 2023-24. The main variances are: 
a) Learning Disabilities are projected to overspend by £1.205m and the main
variances are: 
• Care Packages (including residential and direct payments) - projected
overspend of £0.451m in community care packages, £0.282m in direct
payments and £0.147m for residential placements. This is an overall
favourable movement of £0.187m.  Community Learning Disability Care
packages are proving to be one of the most challenging areas to address
overspends.  The data from CM2000 will be reported back to the service to
allow them to see where care has deviated from the planned level and focus
reviews to those areas.   
• Residential Respite is projected to overspend by £0.126m  (£0.022m
favourable movement).  The overspend reflects funding the new facility
(Roslin House) to full capacity (£0.069m) and increased energy costs
(£0.057m). 
• Trindlemoss non-employee costs are projected to underspend by £0.199m
which is a favourable movement of £0.110m.  This partly relates to budgets
set aside for the running costs of the pool. 
b) Community Mental Health services are projected to underspend by £0.532m
(adverse movement of £0.069m) which is mainly due to an underspend of £0.450m
in community packages (including direct payments) and an underspend in
residential placements of £0.135m.   
c) The Lead Partnership for Mental Health is projecting to be £0.594m overspent
which is an adverse movement of £0.555m and the main variances are as follows: 
• A projected overspend in Adult Inpatients of £0.200m which is an adverse
movement of £0.306m.  This overspend is mainly due to overspends in
supplementary staff (which reduced from month 7), staff in redeployment and
reduced bed sale income.
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.320m (£0.120m adverse movement due to increased enhanced
observations) based on current number of placements remaining until the year
end. These placements are for individuals with very specific needs that require
a higher level of security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women, people
60

Page 61

Official-Protect
with a learning disability or people with neurodevelopmental disorder. This can
necessitate an UNPACs placement with a specialist provider which can be out-
of-area.  The nature of mental health UNPACS spend is that it is almost
exclusively on medium or long term complex secure residential placements
which are very expensive so a small increase in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions between
units or levels of security can take many months. Applications to approve a
placement are made to the Associate Medical Director for Mental Health who
needs to be satisfied that the placement is appropriate and unavoidable prior
to this being agreed. 
• A projected overspend in MH Pharmacy of £0.100m (no movement) due to an
increase in substitute prescribing costs. 
• Learning Disability Services are projected to overspend by £0.275m (no
movement). This is mainly due to high usage of supplementary staffing, cross-
charging for a LD patient whose discharge has been delayed and redeployment
staffing costs. Supplementary staffing costs relate to backfill for sickness,
increase and sustained enhanced observations and vacancies.  The enhanced
observations are reviewed on a daily basis however, due to the individuals
being acutely unwell at present, this level of enhanced observations has been
maintained for a lengthy period of time.   The projection assumes that we begin
cross charging another HSCP for the ongoing costs of the person detailed
above where, despite having extensive time to identify an alternative placement
there has been no solution identified.
• Elderly Inpatients are projected to overspend by £0.134m (no movement)
mainly due to the reduced use of supplementary staffing.  
• The reduction in National Insurance contributions has resulted in a part year
saving to the Lead Partnership of £0.148m which is included in the projection.
• The Innovation Fund is projected to underspend by £0.145m which is
favourable movement of £0.145m.  This is due to slippage within some of the
projects and not all of the funding was allocated.
• Band 2 to 3 regrading – there is a projected overspend of £0.350m relating to
back dated cost for the Band 2 – 3 regrade.   This is an estimate and it is
assumed that the total cost of £0.700m is split 50/50 between lead and non-
lead services.
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.701m in 2022-23, further
information is included in the table below: 
The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• Adult Community Health services £0.192m
• Adult Inpatients £0.200m
• CAMHS £0.600m
Vacancy Savings Target (£0.481m)
Projected to March 2023 £2.182m
Over/(Under) Achievement £1.701m
61

Page 62

Official-Protect
• Mental Health Admin £0.370m
• Psychiatry £0.100m
• Psychology £0.680m
• Associate Nurse Director £0.040m 
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £38.023m there is a projected overspend of £2.978m
(7.8%) which is an adverse movement of £0.477m. The main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£2.985m which is an adverse movement of £0.534m. The main areas within this
are noted below: 
• Children’s residential placements are projected to overspend by £3.196m prior
to Covid funding and projected to overspend by £2.300m after £0.896m of
Covid funding.  This is an adverse movement of £0.285m.  We started 22/23
with 23 placements and there are currently 29 placements.  It is assumed that
all current placements are continuing until the end of the year.
• Fostering placements are projected to underspend by £0.236m (£0.060m
favourable movement). This is based on the budget for 115 places and 115
actual placements (of which 6 are Covid related and are funded through the
Covid-19 funding) since the start of the year. Although we are at the number of
budgeted placements this was not the case throughout the year when we were
under the budgeted level.  Recruitment of foster carers is an active priority for
the team, both to limit the requirement for external foster placements and
reduce pressures elsewhere on the service. This is promoted through regular
targeted recruitment campaigns, community awareness raising and daily
presence on various social media platforms. Our active recruitment strategy is
gaining some interest and we are actively pursuing a number of enquiries as a
result.
• Fostering Xtra placements are projected to be on-line (no movement) after
applying £0.086m of Covid funding. The projection is based on the budget for
30 placements and 33 current placements. 
• Private Fostering placements are projected to be £0.047m underspent (no
movement) based on the budget for 17 placements and 13 current placements.
• Kinship placements are projected to underspend by £0.137m which is an
adverse movement of £0.043m and this is based on the budget for 376 places
and 351 current placements.  
• Adoption placements are projected to overspend by £0.087m (£0.015m
adverse movement).  This is based on the budget for 56 places and 62 actual
placements. 
b) Children with disabilities – residential placements are projected to overspend
by £0.414m which is an adverse movement of £0.241m.  This is based on an
increased number of placements (12) which are expected to continue until the
end of the year and an increase in the rates paid for some of the placements. 
c) Residential respite – placements are projected to overspend by £0.444m which
is an adverse movement of £0.035m.  These short-term placements are used
62

Page 63

Official-Protect
to prevent an admission to full residential care.  There is one placement
continuing at month 10 but it is expected to cease 13 March 2023. 
d) Children’s Houses Employee Costs – are projected to overspend by £0.310m
due to the additional overtime costs. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
AHP services are projected to underspend by £0.132m due to underspends in non-
employee costs. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £1.704m due to a projected underspend in the
Carers Strategy funding. This is a favourable movement of £0.712m. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £3.260m which is
a favourable movement of £0.405m.  The main areas of underspend are:
• An over-recovery of payroll turnover of £2.400m for social care services and an
over-recovery of payroll turnover of £0.606m for health services as outlined in
the table below.
• The reduction in National Insurance contributions has resulted in a part year
saving to the Non-Lead Partnership of £0.148m and £0.150m for social care
which is included in the projection for Management and Support.
• The additional saving in LD day care employee costs has transferred to the
HSCP strategy code and will be proposed as a saving for 2023/24.
• Band 2 to 3 regrading for non-lead services– there is a projected overspend of
£0.350m relating to back dated cost for the Band 2 – 3 regrade.   This is an
estimate and it is assumed that the total cost of £0.700m is split 50/50 between
lead and non-lead services.  
• The 2022-23 budget included a budgeted surplus on the social care side offset
by a budgeted deficit on the health side of the budget.   The net impact is neutral
but Appendix A will show this position for each element. 
The turnover targets and projected achievement for the financial year for Health and
Social Care services out with the Lead Partnership is noted below: 
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £3.769m (187% of annual target) has been
achieved to date.  The turnover achieved to date is higher than usual as the 22/23
budget included investment in various areas of staffing and these posts are not fully
recruited to yet. 
Social Care Health
Services
Vacancy Savings Target (2.014m) (1.183m)
Projected to March 2023 4.414m 1.789m
Over/(Under) Achievement 2.400m 0.606m
63

Page 64

Official-Protect
The health vacancy projection to the year-end is based on the month 10 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas. 
The main areas at month 10 are: 
• Learning Disability £0.523m
• Management and Support   £0.561m
• Community Care Service Delivery £0.574m
• Rehab and Reablement £0.454m
• Locality Services £0.340m
• Integrated Island Services £0.360m
• Community Mental Health £0.242m 
There have been no intentional plans to pause or delay recruitment and services have
actively continued to recruit; in some service areas it has proven difficult to fill posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 LOCAL AUTHORITY PAY AWARD SHORTFALL 
The recently agreed local government pay award was not fully funded.  The total cost
of the pay award was £4.384m against the budgeted increase of £2.077m. The
additional cost of £2.307m will be partially met by additional recurring Scottish
Government funding of £1.866m and the gap of £0.441m will be an in-year overspend
with the recurring cost being factored into the 23/24 budget. 
There is also an additional cost in relation to the additional day of leave as some
frontline posts will require to be covered during this leave.  The annual estimated cost
of this is £0.120m and it is assumed that £0.050m has still to be incurred before the
year end and this is included in the 22/23 projected outturn. 
2.10 Savings Progress 
a) The approved 2022-23 budget included £0.683m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 10
£m
Red - 0.060
Amber 0.060 -
Green 0.623 -
Blue - 0.623
TOTAL 0.683 0.683 
b) The main area to note is that red savings of £0.060m relating to adoption
allowances will not be achieved but this is accounted for in the projected
64

Page 65

Official-Protect
outturn.  The review of allowances is complete, but the benefit will not be
realised until future years as the changes will apply to future cases.   
Appendix B shows the full Transformation Plan for 2022/23 which has been agreed
by the Transformation Board; the Board is in place to provide oversight and
governance to the programme of service change.   A focus of the Board is to ensure
plans are in place to deliver savings and service change, with a solution focussed
approach to bringing programmes back on track. 
Not all the service changes on the Transformation Plan have savings attached to them
but there is an expectation that they will lead to service improvements. The Plan is
critical to the ongoing sustainability and safety of service delivery and to supporting
the delivery of financial balance in future. 
Appendix C provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving.   
2.11 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis…. without
the express consent of the Integration Joint Board.” 
Appendix D highlights the movement in the overall budget position for the Partnership
following the initial approved budget. 
Reduction Requiring Approval:
1) Training Grades Reduction  £0.029m
2) Franking Transfer to Acute  £0.001m
3) AHP Clinical Admin to South HSCP £0.021m
4) ADP Reduction £0.324m
5) A&E Liaison Funding to South and East HSCP £0.139m
6) Foxgrove Revenue Costs £0.014m
7) Transfer to Capital – Bladder Scanner £0.008m
8) Buvidal Funding Pharmacist to Acute £0.014m
9) MDT Reduction £0.006m 
10) TEC Contribution   £0.053m
11) Covid Funding returned to the Scottish Govt  £8.263m
12) Carer Support to Education £0.020m 
2.12 NHS – Set Aside and Pan Ayrshire Services 
Lead Partnerships:
The IJB outturn position is adjusted to reflect the impact of Lead Partnership services.
The outturn for all Lead Partnership services is shared across the 3 Partnerships on
an NRAC basis; this position is currently the default pending further work to develop
a framework to report the financial position and risk sharing across the 3 Partnerships
in relation to hosted or lead service arrangements, which has been delayed by the
requirement to focus efforts on the Covid response. 
65

Page 66

Official-Protect
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
require to be shared with North. At Month 10 the MH lead partnership is projected to
overspend by £0.594m (£0.192m NRAC share for East and £0.183m for South). The
information reported for South and East is the month 9 info as they do not report at
month 10. 
East HSCP –the month 9 position is a projected £0.969m underspend of which
£0.359m (37%) is attributable to North.  The main variances are: 
Primary Care and Out of Hours Services (Lead Partnership) 
There is a projected underspend of £0.793m on the Primary Care Lead
Partnership budget and is due largely to projected underspends in Primary
Care, Primary Medical Services and Dental services where staffing numbers
are running at less than establishment. The projected underspend within Dental
services is largely due to reduced staffing costs in Childsmile and within the
Dental management team, with both service areas running with vacancies. In
addition, there are reduced costs within Primary Care contracting and support,
largely due to staffing turnover, as well as projected savings in diabetic
retinopathy services and East Ayrshire Community Hospital medical and
general pharmaceutical services. 
These reduced costs are partially offset by additional costs in the GP element
of Out of Hours services, as well as additional costs in the overnight nursing
service, with work ongoing to address as far as possible over the course of the
2022/23 financial year. Ayrshire Urgent Care Services costs related to the
Covid-19 pandemic are recharged against the Local Mobilisation Plan
(Community Clinical Hub). As highlighted previously in this report, projected
costs for 2022/23 require to be reduced as far as possible, with a recovery plan,
to ensure costs can be contained within budget going forward. 
Prison and Police Healthcare (Lead Partnership) 
The £0.176m projected underspend at month 9 is largely due to net staffing
savings. Medical contracts at both Prison and Police have reduced and is
contributing to the projected underspend. These contracts have been
renegotiated with 2021/22 being the first year of the new contract for Prison
and Police Custody.  A review of the prison service is being undertaken and it
is anticipated that surplus funds will go towards improving staffing levels within
the prison. 
Other Lead Services 
The £0.100m projected outturn is online with budget and relates to anticipated
charges for services from Marie Curie. All three Ayrshire IJBs approved
additional funding of £0.004m on a non-recurring basis as part of their 2022/23
budgets to increase the overall budget from the £0.088m baseline. This
additional funding is required to offset identified cost pressures and to meet
service demands from 1 April this year. The non-recurring nature of the
approved uplift reflects that a service review is to be undertaken in 2022/23. 
66

Page 67

Official-Protect
South HSCP – projected overspend of £0.130m of which £0.048m will be allocated
to North. The overspend is mainly due to an overspend in the community store and
continence service offset by vacancies in the Family Nurse Partnership. 
Set Aside: - an approach has yet to be decided on for 22/23, which may be used as
a “shadow year” for using current year activity. This will depend on how representative
the activity is felt to be. By default, inflation will be applied to the 2021/22 budget. The
annual budget for Acute Services is £400.4m.  The directorate is overspent by
£11.7m, caused by increasing overspends on agency medical and nursing staff,
together with increasing drug expenditure. These have been required due to the level
of operational pressure being experienced, in common with many other areas in
Scotland. 
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• High numbers of delayed discharges and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
2.13  FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2022-23
budget during the year, these include: 
• High risk areas of low volume / high-cost services areas e.g. Learning Disability
care packages, children’s residential placements and complex care packages.
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this.
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The impact and implementation of the National Care Service.
• The NHS pay award has been settled for 2022-23 but confirmation of
additional Scottish Government funding is awaited.
• The current extremely high levels of inflation
• Supported Accommodation - funding has been included in the budget for the
new developments but the adequacy of the funding will only be known when
the final occupants are agreed.
• Fire dampener compensation (Woodland View) – the final level of
compensation has still to be agreed and the £0.306m previously assumed in
the projection has been removed due to the uncertainty surrounding this. 
These risks have been monitored throughout 2022-23 and the financial impact
reported through the budget monitoring report. 
67

Page 68

Official-Protect
2.14 COVID-19 – FINANCE MOBILISATION PLAN IMPACT 
Summary of position 
From the outset of the pandemic the HSCP acted very swiftly to respond and
developed a mobilisation plan detailing the additional activities to support our
response, alongside the estimated financial impact.  Financial returns were submitted
to the Scottish Government on a regular basis during 2020-21 and 2021-22, on the
premise that any additional costs aligned to mobilisation plans would be fully funded. 
This process will continue during 2022-23 with returns moving from quarterly to
monthly.  Covid funding of £13.321m was carried forward from 2021-22 for use in
services delegated to the Partnership during 2022-23 and the costs outlined below will
be met from this funding. Any unused funding will be reclaimed by the Scottish
Government and redistributed to Health Boards for Covid-related costs in non-
delegated services. 
2.15 Mobilisation Plan and Funding Position 
The initial month 3 mobilisation plan cost submission was submitted in July and
estimated the costs to be £4.067m to March 2023.   The changes since month 3 are
summarised in the table below with the main area being payments to providers to
reflect the payments made to date and the extension of part of the scheme to 31st
March 2023.  The costs remain estimates as the situation continually evolves there
will be a further update submitted each month.   
The main areas of cost are summarised below: 
Service Area Initial
Month 3 
Return  
£m
Month 4 
Return 
£m
Month 5
Return          
£m
Months
6,7,8,9      
Return         
£m
Month 10
Return
£m
Payments to Providers  1.100  1.100 1.953 2.143 2.143
PPE 0.418 0.418 0.419 0.326 0.265
Additional Staff  1.317  1.317 1.315 1.318 1.318
Loss of Income  0.246  0.246 0.246 0.210 0.210
Children & Families 0.957  0.957  0.957 1.107 1.107
Other Areas 0.029 0.029 0.015 0.015 0.015
TOTAL  4.067   4.067  4.905 5.119 5.058 
Based on the projected spend, £8.263m of funding has now been reclaimed by
Scottish Government. IJBs have been advised by Government that a year-end
reconciliation and balancing adjustment will be conducted in the event that too much
or too little funding has been retained. 
2.16 Provider Sustainability Payments and Care Home Occupancy Payments 
COSLA Leaders and Scottish Government have agreed an approach to supporting
the social care sector to ensure that reasonable additional costs will be met.   We have
been making payments to commissioned social care providers in line with the agreed
68

Page 69

Official-Protect
national principles for sustainability and remobilisation payments to social care
providers during COVID 19.  
Care Home Occupancy Payments - The Scottish Government ceased these
payments at the end of October 2021 but exceptions were made following the Omicron
outbreak and limited payments were made to eligible care homes.  Meetings are being
held with each care home to discuss ongoing sustainability and to provide support.   
Sustainability payments – the most recent guidance issued in September 2022
continued the reduced the scope of what providers can claim for and also outlined
deadlines for claims to be submitted.  The main costs that can be claimed relate to
testing and vaccination and this is extended to 31st March 2023.  The Social Care Staff
Support Fund was also extended to 31st March 2023 (previously to 30th September
2022). 
The sustainability payments are a significant cost in our mobilisation plan and the
timely submission by providers and assessment of claims is key to ensuring we can
accurately estimate the financial cost and ensure the costs are reclaimed from the
Scottish Government. Quarter 3 claims must be submitted by 28th February 2023 and
quarter 4 claims must be submitted by 30th April 2023 and providers have been
informed about this.  The breakdown of payments made in 2022-23 up to 31st January
2023 are shown in the tables below: 
PROVIDER SUMMARY
NCHC
Care
Homes Other Total
Total Number of Providers 17 49 66
Number contacting NAC 17 14 31
Providers Supported to date 17 14 31    
OUTSTANDING CLAIMS
NCHC
Care
Homes Other Total
Total Number of Claims                         -    1 1
Value of Claims                         -    897  897 
SUPPORT PROVIDED
NCHC
Care
Homes
Other
Services TOTAL   
£ £ £
Occupancy Payments  81,650 0 81,650
Staffing 681,442 251,586 933,029
PPE, Infection Control 181,354 47,703 229,057
Other 170,969 7,894 178,863
TOTAL 1,115,415 307,183 1,422,599 
69

Page 70

Official-Protect
2.17 RESERVES 
The IJB reserves position is summarised in the table below with full detail given in
Appendix E. 
The opening ‘free’ general fund balance of £7.248m is held as a contingency balance,
this equates to around 2.5% of the IJB budget for 2021-22 which is above the lower
target level of 2%. 
The full outstanding debt to North Ayrshire Council of £2.321m has now been repaid;
the increased payment was funded by a transfer of budget from the Council so there
was no detriment to the IJB financial position. 
General Fund
Reserves 
Earmarked Reserves
Total  Debt to
NAC
Free
GF
SG
Funding
Non-SG
Funding                     
£m
HSCP 
£m £m £m £m £m £m
Opening Balance
- 1 April 2022 (2.321) 7.248 23.106 0.699 0.500 29.232
In year
movements at
month 10 2.321 (0.800) (8.263) - - (6.742)
Revised Balance - 6.448 14.843 0.699 0.500 22.490 
These balances will be adjusted after the year-end to reflect the actual use of reserves
during 2022-23 and the updated carry forward position. 
A review of earmarked reserves has taken place and has identified £1.252m of
balances which can be released. IJB will be asked to approve the use of these in
supporting a balanced budget position for 2023-24. 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2022-23 from
within the available resource, thereby limiting the financial risk to the funding partners. 
The estimated costs and funding in relation to the Covid-19 response also require to
be closely monitored to ensure that the IJB can plan for the impact of this and to
ensure that the IJB is in the position to re-claim funding to compensate for the
additional costs.
3.2 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2022-
23. 
70

Page 71

Official-Protect
4. IMPLICATIONS 
Financial:  The financial implications are as outlined in the report.  
Against the full-year budget of £276.985m there is a
projected underspend of £1.181m. The report outlines the
main variances for individual services.      
Human Resources: The report highlights vacancy or turnover savings achieved
to date. Services will review any staffing establishment plans
and recruitment in line with normal practice when
implementing service change and reviews as per agreement
with the IJB, there is no intention to sustain this level of
staffing capacity reduction on a recurring or planned basis. 
Legal: None
Equality: None
Children and Young People None
Environmental &
Sustainability:
None 
Key Priorities: None
Risk Implications: Para 2.13 highlights the financial risks. 
The report falls in line with the agreed risk appetite
statement which is a low-risk appetite in respect to
adherence to standing financial instructions, financial
controls and financial statutory duties and a high-risk
appetite in relation to finance and value for money.
Community Benefits: None 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran √ 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
The IJB financial monitoring report is shared with the NHS Ayrshire and Arran Director
of Finance and North Ayrshire Council’s Head of Finance after the report has been
finalised for the IJB. 
6. CONCLUSION 
6.1 It is recommended that the IJB: 
(a)  notes the overall integrated financial performance report for the financial year
2022-23, the overall projected year-end underspend of £1.181m;
(b) notes the progress with delivery of agreed savings;
(c) notes the remaining financial risks for 2022-23;
71

Page 72

Official-Protect
(d) approves the budget reductions which are detailed at para 2.11. 
For more information please contact: 
Paul Doak, Head of Finance and Transformation at pdoak@north-ayrshire.gov.uk or
Eleanor Currie, Principal Manager – Finance at eleanorcurrie@north-ayrshire.gov.uk   
72

Page 73

Official-Protect
2022-23 Budget Monitoring Report–Objective Summary as at 31st January 2023       Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 66,479 65,944 (535) 16,741 17,171 430 83,220 83,115 (105) 422 (527)
: Locality Services 27,908 27,269 (639) 5,388 5,538 150 33,296 32,807 (489) (191) (298)
: Community Care Service Delivery 33,436 33,186 (250) 0 0 0 33,436 33,186 (250) (90) (160)
: Rehabilitation and Reablement 1,797 1,779 (18) 0 0 0 1,797 1,779 (18) (3) (15)
: Long Term Conditions 999 1,102 103 9,079 9,359 280 10,078 10,461 383 583 (200)
: Community Link Workers 195 184 (11) 0 0 0 195 184 (11) (3) (8)
: Integrated Island Services 2,144 2,424 280 2,274 2,274 0 4,418 4,698 280 126 154
MENTAL HEALTH SERVICES 31,078 31,811 733 57,091 57,595 504 88,169 89,406 1,237 740 497
: Learning Disabilities 21,498 22,703 1,205 453 453 0 21,951 23,156 1,205 1,330 (125)
: Community Mental Health 5,845 5,373 (472) 1,522 1,462 (60) 7,367 6,835 (532) (601) 69
: Addictions 3,735 3,735 0 1,618 1,588 (30) 5,353 5,323 (30) (28) (2)
: Lead Partnership Mental Health NHS Area Wide 0 0 0 53,498 54,092 594 53,498 54,092 594 39 555
CHILDREN & JUSTICE SERVICES 34,053 37,031 2,978 3,970 3,970 0 38,023 41,001 2,978 2,501 477
: Irvine, Kilwinning and Three Towns 3,145 3,114 (31) 0 0 0 3,145 3,114 (31) 42 (73)
: Garnock Valley, North Coast and Arran 3,160 3,160 0 0 0 0 3,160 3,160 0 (29) 29
:Intervention Services 1,856 1,873 17 339 339 0 2,195 2,212 17 15 2
: Care Experienced Children & Young people 22,061 25,047 2,986 0 0 0 22,061 25,047 2,986 2,451 535
: Head of Service - Children & Families 1,279 1,284 5 0 0 0 1,279 1,284 5 24 (19)
: Justice Services 2,385 2,385 0 0 0 0 2,385 2,385 0 0 0
: Universal Early Years 167 168 1 3,185 3,185 0 3,352 3,353 1 (2) 3
: Lead Partnership NHS Children's Services 0 0 0 446 446 0 446 446 0 0 0
CHIEF SOCIAL WORK OFFICER 2,560 856 (1,704) 0 0 0 2,560 856 (1,704) (992) (712)
PRIMARY CARE 0 0 0 51,117 51,117 0 51,117 51,117 0 0 0
ALLIED HEALTH PROFESSIONALS 0 8,701 8,569 (132) 8,701 8,569 (132) (122) (10)
COVID NHS 0 0 0 (8,263) (8,263) 0 (8,263) (8,263) 0 0 0
MANAGEMENT AND SUPPORT COSTS 10,917 7,413 (3,504) 2,541 2,785 244 13,458 10,198 (3,260) (2,855) (405)
LOCAL AUTHORITY PAY AWARD SHORTFALL 0 491 491 0 0 0 0 491 491 561 (70)
OUTTURN ON A MANAGED BASIS 145,087 143,546 (1,541) 131,898 132,944 1,046 276,985 276,490 (495) 255 (750)
Return Hosted Over/Underspends East 0 0 0 0 (192) (192) 0 (192) (192) (13) (179)
Return Hosted Over/Underspends South 0 0 0 0 (183) (183) 0 (183) (183) (12) (171)
Receive Hosted Over/Underspends South 0 0 0 0 48 48 0 48 48 53 (5)
Receive Hosted Over/Underspends East 0 0 0 0 (359) (359) 0 (359) (359) (360) 1
OUTTURN ON AN IJB BASIS 145,087 143,546 (1,541) 131,898 132,258 360 276,985 275,804 (1,181) (77) (1,104)
Over/
(Under)
Spend
Variance at
Period 7
Movement in
projected 
variance
from Period
7
TOTAL
Partnership Budget - Objective Summary
Council Health
2022/23 Budget
73

Page 74

Official-Protect
2022-23 Transformation Plan               Appendix B 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 10
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Children, Families and Justice
Services
SP/HSCP/20/1 Children and Young People - External
Residential Placements
Monitor and review all placements with a view to
reducing the overspend.
Amber Saving -                    -              
SP/HSCP/20/4 Adoption Allowances Montior Adoption Allowances. With a view to reduce
the overspend
Red Saving 59,535         -                    -               59,535        
SP/HSCP/20/19 Fostering - reduce external
placements.
Monitor Fostering Placements with a view to reduce
the overspend
Red Saving -                    -              
Transport review Review of costs relating to taxi utilisation and
implemenation of new electronic form.  Aim to reduce
transport budget in council.  Links in with David
Hammonds Tranformation Project.
Red Saving
Grow internal fostering capacity Review capacity of existing foster carers with a view
of increasing existing capacity
Amber Cost neutral
NACSTA4030 Fostering Short Breaks Develop an inhouse short break service to replace
the commisioned service provided by Cornerstone.
Amber Saving -                    -               -              
Mental Health and LD
Transformation of CAMHS - CAMHS
Specification
CAMHS have reviewed and updated referral
guidance to align with the CAMHS National
Specification. Some risks identified in order to
facilitate the continued changes are accommodation,
and recruitment of clinical staff.
Amber Investment     1,091,463
Transformation of CAMHS - CAMHS
Age 25
CAMHS are developing specific pathways to provide
care and support up to the age of 25 where
appropriate e.g. Eating Disorders, Neuro, Personality
Disorders, Early Psychosis.
Amber Investment       623,402
Transformation of CAMHS - CAMHS
Waiting List
Two external providers have been procured to
support Neuro waiting for assessment (Purple House
Amber Investment       311,701
74

Page 75

Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 10
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Transformation of CAMHS - CAMHS
Psyc Waiting List
Clinical Director & Senior Manager agreed plan in order to
reduce access to Psychiatry.  In addition to this, 3 non-
medical prescribers have been trained and are prescribing
for ADHD clinics.
Amber Investment       366,707
Transformation of CAMHS - Out of
Hours Unscheduled Care
Recruitment and implementation of a new service to provide
support to children and young people on an unscheduled
basis.  CAMHS are being commissioned by Paediatrics to
deliver this service via Scottish Government funds.
Amber Investment         86,294
Transformation of CAMHS - CAMHS
Intensive Home Treatment Recruitment is ongoing.  Accommodation required to house
team together. Ongoing development of policies and
procedures for team in alignment with partners agencies
Amber Investment         14,752
Transformation of CAMHS - CAMHS
Liaison
Amber Investment       129,073
Primary Care Mental Health investment Creation of a business case to deliver Mental Health to
Primary Care over the next 4 years.  Allocation of funds will
be incrementally incraesed over the duration of the next four
years.  North leading for Ayrshire.
Green Investment       261,159
Continued review of models of care at
Woodland View
A particular focus on rehabilation models of care for MH
building on learning from Warrix Avenue.  Development of a
business case for ARBD is also underway.  A test of change
for ward 7B will be reported through this workstream.
Amber
Implementation of MAT standards Programme of work to set up the systems required to report
on Medical Assisted Treatment standards for Addictions.  The
programme will be run on a  pan ayrshire basis led by North. 
The national direction was for this to be led by Public Health
but they have not started any recruitment so North will take
forward in the meantime.
Green Investment
Complex Care Model - Independent
living change fund
Recruit the Intensive Support Team agreed through this fund
and monitor progress of assessments of out of area
placements.  A dynamic register should be developed and
maintained which will feed into national data.
Amber Investment       513,000
ACORN business model Mental Health Rehabilitation service needing help to
transition to a social enterprise.  Now incoporated within
Caring for Ayrshire.
Red Saving -              -                    -                  -              
Implementation of Trakcare Patient
Management System in Community
Services
Implementation of new information recording system for NHS
to report on 18 weeks RTT.  This will include development of
new processes and transfer of data from current system to
the new one.  This will allow for better recording of clinical
activity and inform future DCAQ work.  Adult community
mental health will go live first followed by other community
teams currently utilisating Access databases.  A Pan Ayrshire
referral management service will be set up to embed the
systems and monitor data recording to ensure accurate
Green Cost neutral
Implementation of Unscheduled Care Part of the national redesign of urgent care work. The aim of
the mental health project is to deliver an integrated system to
support mental health and wellbeing by utilising existing
mental health services and enhancing their pathways for
unscheduled mental health presentations.
Green Investment
75

Page 76

Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 10
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Health and Community Care
TEC Solutions To appoint a temporarory 'Project Manager' post, who will
oversee the procurement and installation of digital telecare
equipment
Green Investment         50,000 -               -              
Analogue to Digital Funding received for a Project Manager to manage the
process of moving all services users from analogue to digital
technology.
Amber Investment       996,000
SP/HSCP/20/17 Care at Home - Service Review This project will incorporate the review of the care at home
job role and any implications for service as a result as well as
Amber Investment -               -              
Hospital Team Model Green
Arran Integrated Services model Continue to work towards an Integrated Hub on Arran
building on the frailty work and developing a single point of
contact for all health and social care services. It is anticipated
there will be a substantial amount of investment required and
a business case will be developed.
Green
Primary Care Investment Fund Remodel how we deliver primary care locally, ensuring that
multi-disciplinary teams are available in each medical
practice across North Ayrshire. This will help ensure that
when needed local people will get the right care and support
they need
Green Investment
HSCP MDT - Community Health &
Care
Implement HSCP MDTs across each of the localities to
support GP practices and HSCP service coordinate care for
those with the most complex needs. This approach will
replace Older People Local Operational Teams.’
Develop Care at Home - Minimum data
set
Scope all current recording processes for data and look to
consolidate a dataset that can be used for all reporting
needs.
Cost neutral
AHP Whole System redesign Build on the learning from the recent AHP workforce exercise; to
better understand the distribution and contribution of AHPs in
health and care in North Ayrshire, to support future workforce
planning that maximises this contribution for the benefit of the
people of North Ayrshire.
Amber
Interim Beds To utilise a one-off lump sum, provided by the Scottish
Government, to provide interim beds, for a maximum of 6
weeks, for clients who will have an onward move to
permanent care.
Green
76

Page 77

Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 10
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Partnership Wide
Supported acc models - NAC housing/
Sleepover/ outreach model
Continue working with third sector providers to implement
supported accommodation models in the community
Green Saving -                  -              
SDS Review Engage with all stakeholders to look at how we encourage a
more innovative and person centred approach to SDS. 
Implement an SDS Review Learning Board to help progress.
Carers Review Develop a resource release model for allocation of funds for
carers as well as implement a short break service.
Amber Saving -                    -                  -              
Adult Complex Care Model - Call
Monitoring
Review of call monitoring system for provision of adult
community supports.  This will include evaluation of current
provision and development of  a specification for future
tender as the current contract is due to expire.
Implementation of Eclipse information
system
Implementation of new information recording system for
social care to replace Care First.  This will include
dedvelopment of new protocols and transfer of data from
current system to the new one.
Money matters and GP Practice
Welfare Rights service
Facilitate the introduction of a money advise service available
within GP practices.
Investment         78,000
Payroll Turnover Inflation Monitor  slippage through staff turnover with a  view to
meeting the savings target.
Saving 301,201       301,201            -                                     -
Business Support Review (linked to
Care at home review)
Scope and review the remit of the business support unit and
how it could be adapted to the benefit of all HSCP teams.
North Elderly Mental Health inpatients
(lead partnership)
Agree the spend going forward for the recurring savings
achieved through bed retraction from Ailsa.
Saving 321,000       321,000            -                                     -
HSCP  Challenge Fund - invest to save Monitoring of all projects approved through the Challenge
Fund with a focus on invest to save ideas.
Transitions Improve transition pathways from Childrens to Adult services
as well as into older adults in order to improve outcomes for
service users.
Caring for Ayrshire The focus for Caring for Ayrshire is to bring a greater
proportion of health provision into local communities. The
Caring for Ayrshire work will ensure local GP practices are fit
for purpose and have the capacity to host multi-disciplinary
teams and meet local health and care needs.
Investment
Advocacy Strategy Refresh of Advocacy strategy with a view to incorporating
both adult and childrens services.
Cost neutral
77

Page 78

Official-Protect
2022-23 Savings Tracker            Appendix C 
Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 10
Saving
Delivered @
Month 10                  
£m
Projected to
Deliver during
Year                        
£m
Projected
Shortfall                
£m
Comment
1 Adoption Allowances Amber 0.060 Red                    -                  0.060                     -   Currently projecting an overspend. 
TOTAL SOCIAL CARE SAVINGS 0.060 0.000 0.060 0.000
Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 10
Saving
Delivered @
Month 10                  
£m
Projected to
Deliver during
Year                        
£m
Projected
Shortfall                
£m
Comment
2 Payroll Turnover Inflation Green 0.302 Blue 0.302                    -   Achieved
3 Elderly Mental Health inpatients (lead partnership) Green 0.321 Blue 0.321                    -                       -   Achieved
TOTAL HEALTH SAVINGS 0.623 0.623 0.000 0.000
TOTAL NORTH HSCP SAVINGS 0.683 0.623 0.060 0.000
North Ayrshire Health and Social Care Partnership
2022/23 Savings
78

Page 79

Official-Protect
2022-23 Budget Reconciliation               Appendix D 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     116.017
Base budget adjustments 1   (0.046)
Uploaded Budget     115.971
Resource Transfer 1 P 26.228
Software Licences transfer to IT 3 P (0.002)
Montrose Cleaning Post to Facilities Management 3 P (0.014)
Software Licences transfer to IT 4 P (0.003)
Summer of Play Funding from Education 5 T 0.056
Insurance – transfer to corporate 6 P (0.075)
Software Licences transfer to IT 6 P (0.006)
MARAC funding 6 T 0.009
Pay Award Funding 7 P 1.866
Commercial Waste - Corporate adjustment 7 P 0.013
Family Wellbeing Fund 7 T 0.959
Software Licences transfer to IT 7 P 0.001
DWP income re CHIS 9 P 0.008
Carer Support to Education 10 T (0.020)
ADP Funding to Money Matters 10 T 0.098
Roundings (0.002) 
Budget Reported at Month 10 145.087    
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     163.988
Resource Transfer     (26.228)
Month 10-12 Adjustments     22.401
Adjust for Non-recurring funding     (22.408)
Full Year effect of Part Year Reductions     0.128
REVISED 22-23 BUDGET     137.881
Training Grade Adj – April 1 P (0.064)
Vire No 2 - East to North CAMHS Admin 1 P 0.099
Band 2-4 SG Funding reduction 1 P (0.007)
AHP Clinical Admin Budget Transfer 2 P 0.048
Dean Funding to Partnerships 2 P 0.085
Prescribing Uplift 2 P 1.631
Prescribing Cres 2 P (0.715)
Prescribing out non schedule 5 2 P (0.429)
Scottish Huntington’s Post 3 P 0.014
Daldorch Income Shortfall 3 P 0.045
Community Store Contributions 3 P (0.006)
Iona/Lewis Patient to South 3 T (0.046)
79

Page 80

Official-Protect
Marie Curie contract uplift 3 P (0.004)
Trakcare/Huntington’s/ Daldorch 3 P 0.086
Staff Wellbeing Posts from OH&RD 4 P 0.193
Top Slicing Posts- Prescribing 4 P (0.071)
Admin Post transferred to Medical Records 4 T (0.034)
Naloxone for Police Scotland 4 T 0.026
Dean Funding  5 P 0.095
Rx Top Slicing to Pharmacy 5 P (0.008)
Uplift DOAC (Direct Oral Anticoagulant) Rebate 5 P 0.06
Uplift CRES to Primary Care Rebate Scheme 5 P 0.068
Dysphagia Post  5 P (0.021)
ADP PSST Support 5 T 0.008
CAMHS Liaison Funding 5 T (0.350)
Specialist Pharmacist in Substance Misuse 6 T 0.012
BBV (Blood Borne Virus) Funding 6 T 0.242
Maternal and Infant Nutrition Allocation 6 T 0.020
Dean Funding Pay Award 6 P 0.061
GP Office 365 Upgrade 6 T (0.137)
HD200 Drug Tariff Reduction 2022-23 7 P (0.320)
Medical Pay Award 2.5% Top Up 7 T 0.170
Training Grades Reduction 8 P (0.029)
Pulmonary Rehab Physio Monies 8 P 0.023
Franking transfer to Acute 8 P (0.001)
AHP Clinical Admin to South HSCP 9 P (0.021)
ADP Reduction 9 T (0.324)
District Nursing Funding 9 T 0.037
A&E Liaison funding rtn'd to South/East ADP's 9 P (0.139)
Prescribing Uplift 9 T 1.787
NSAIS - Revenue Costs 9 T (0.014)
Revenue to Capital - North Bladder Scanners 9 T (0.008)
HD342 VETERAN MENTAL HEALTH SUPPORT 9 T 0.105
HD336 LD HEALTH CHECKS 9 T 0.039
BUVIDAL FUNDING 8A PHARMACIST TO ACUTE 9 T (0.014)
MDT Reduction 9 P (0.006)
TEC Contribution 10 T (0.053)
COVID Funding returned to the Scottish Govt 10 T (8.263)
Mental Health After Covid 10 T 0.102
Diabetes Prevention  10 T 0.042
Roundings 10  T 0.003
Budget Reported at Month 10 131.898    
COMBINED BUDGET MONTH 10 276.985
80

Page 81

Official-Protect
Appendix E 
Opening Reserves Position in Detail 
Earmarked Funds  
: Alcohol & Drug Partnership 890
: Mental Health Action 15 511
: Primary Care Improvement Fund 1,856
: 21-22 Budget Gap 0
: Challenge Fund 500
: Community Living Change Fund 513
: Covid19 Funding 13,321
: Neighbourhood Networks 145
: Mental Health Officer Development Grant 41
: NAC Recovery and Renewal – Mental Health
Element
71
: Joint Equipment 5
: Nethermains Adaptations 40
: Supported Accommodation 50
: Care at Home Capacity 1,192
: Interim Care 1,046
: Trauma Training 50
: Trauma Trainer 48
: Family Wellbeing Fund 106
: Perinatal MH Nurse 65
: Unaccompanied Asylum-Seeking Children 11
: Multi-Disciplinary Teams 644
: Health Care Support Workers 144
: MH Recovery and Renewal  2,057
: Medical photography 4
: Data Sims 28
: School Nursing  56
: Buvidal 109
: AHP Winter Funding 51
: Perinatal and Infant Mental Health 86
: Cossette Funding 18
: Replacement Mattress Programme 78
: Expansion of Primary Care Estates 55
: GP Premises Improvements - tranches 1 and 2 81
: Mental Health Wellbeing in Primary Care 40
: Dental Practice Improvement 265
: Dental Winter Preparedness 128
Total Earmarked 24,305
Outstanding Debt (2,321)
Unallocated General Fund  7,248
General Fund 29,232 
81

Page 82

82

Page 83

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Capital Programme Performance to 31 March 2023 
Purpose:  To advise Cabinet of progress in delivering the Capital
Investment Programme for 2022/23. 
Recommendation:  That Cabinet agrees to (a) note the revisions to budgets
outlined in the report; (b) note (i) the General Services and HRA
revised budgets at 31 January 2023; and (ii) the forecast
expenditure to 31 March 2023; and (c) approve the proposed
revision to the General Services Capital Programme in respect
of the additional borrowing requirement to support the
Shewalton and Nethermains Solar PV projects. 
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2022/23 to 2030/31 was
approved by Council on 2 March 2022. The Housing Revenue Account (HRA) Capital
Investment Programme 2022/23 sits within the updated HRA Business Plan and was
approved by Council on 16 February 2022. 
1.2  This report identifies the current programme for 2022/23, taking account of
adjustments made to the initial budgets. The report presents the revised budgets at 31
January 2023 (Period 10) and forecast expenditure to 31 March 2023. 
1.3   At Period 10 the General Fund is forecasting a projected underspend of (£0.104m)
against a revised budget of £42.813m. The HRA is forecasting a projected
underspend of (£9.102m) against a revised budget of £43.451m. 
1.4  Within the General Fund, adjustments to funding have resulted in net additions to the
overall capital programme of £1.145m, including Scottish Government funding in
relation to the Place Based Investment Programme. Further reviews of individual
project plans have identified a number of adjustments to the current profiles. As a
result, (£7.379m) has been reprofiled for delivery in 2023/24. This has been partly
offset by the acceleration of £0.420m to 2022/23 from future years. 
1.5 Within the HRA, a review of delivery timescales has identified a requirement to re-
profile (£15.302m) of works for delivery in 2023/24 and beyond. This is offset by the
acceleration of £0.985m to 2022/23 from future years. 
Agenda Item 7
83

Page 84

1.6 The major risk to the forecast position is the uncertainty arising from the ongoing
inflationary pressures and supply chain issues which are impacting on tender returns
and the cost of materials, as reported across a number of General Fund and HRA
projects. While some mitigation has been built into the programme to offset cost
pressures, any further significant increase in costs will result in increased borrowing
requirements and may have a negative impact on the deliverability of both the
General Fund and HRA capital programmes for 2022/23 and beyond. Projects will
continue to be monitored closely with cost increases met initially from the additional
flexibility built into the programme. However, any requirement for further borrowing not
met from a funding source will be a matter for Council to consider. 
1.7  Following completion of the tender exercise in relation to the Shewalton and
Nethermains Solar PV projects, it has been identified that an additional investment of
£0.781m is required. Cabinet is requested to approve the additional borrowing
requirement to support this investment with the associated costs to be met from the
anticipated income associated with the projects. 
2. Background 
General Fund 
2.1 The following table outlines the movements in the 2022/23 General Services budget: 
2.2 (a) Changes to Funding 
The capital programme has been updated to reflect the following changes to funding: 
2022/23
£m
Budget as at 30 November 2022 48.627     
a) Changes to Funding 1.082        
b) Other Revisions to the Programme 0.063        
Revised Budget 49.772     
c) Alterations to phasing of projects:-
2022/23 to 2023/24 (7.379)           
2023/24 to 2022/23 0.420        
Budget as at 31 January 2023 42.813     
84

Page 85

2.3 (b) Other Revisions to the Programme 
An adjustment of £0.063m has been reported due to an additional CFCR contributions
in relation to the Brodick Library and the vehicle fleet. 
2.4 (c) Alterations to the Phasing of Projects 
The ongoing review of individual project plans, taking cognisance of the current levels
of volatility within the construction sector, has identified a requirement to re-profile a
further (£7.379m) of works for delivery in 2023/24 and beyond. This includes a
corporate phasing adjustment reflecting the degree of uncertainty in the total
expenditure projections: 
Funding Body Amount Project
Specific Capital Grant £1.093m Place Based Investment Programme
Specific Capital Grant £0.098m UK Shared Prosperity Fund
Specific Capital Grant £0.017m Island Crisis Emergency Fund
Energy Savings Trust £0.102m Workplace Chargers
Scottish Forestry £0.090m Lochshore
Sustrans (£0.133m) Lochshore
SPT (£0.185m) Cumbrae Ferry & Bus Stop
Total £1.082m
Service Amount Project
Communities (£0.160m) UFSM Expansion
(£0.148m) Montgomerie Park Primary
(£0.147m) CO2 Monitors
(£0.032m) Annick Primary Early Years
(£0.070m) Other minor adjustments
(£0.557m)
Chief Executives (£0.130m) LAN/WIFI
(£0.100m) ICT Investment Fund
(£0.012m) Other minor adjustments
(£0.242m)
HSCP (£0.156m) Improvement Grants
(£0.020m) Other minor adjustments
(£0.176m)
85

Page 86

Service Amount Project
Place (£1.700m) Millport Coastal FPS
(£0.641m) PBIP Bank Street
(£0.520m) Island Pit Stops
(£0.356m) Nature Restoration Fund
(£0.343m) Lighting
(£0.330m) AGD i3 DPMC
(£0.300m) Upper Garnock FPS
(£0.252m) Millport Town Hall Regeneration
(£0.239m) Repurposing Property Grant Fund
(£0.237m) Place Based Investment
(£0.168m) Parking Charges & DPE
(£0.163m) LED Lighting Replacement
(£0.159m) Millport Town Hall Phase 2
(£0.148m) Access Path Network
(£0.140m) Town Centre Reneration
(£0.132m) PLI Kilwinning Academy
(£0.113m) Fleet Decarbonisation
(£0.111m) Irvine High Street
(£0.102m) Stevenston Cemetery
(£0.100m) Montgomerie Park Masterplan
(£0.098m) UK Shared Prosperity Fund
(£0.095m) PLI Cunninghame House
(£0.088m) Kilbirnie Cemetery Wall
(£0.077m) VDLF Development Work
(£0.074m) A737 Dalry Bypass
(£0.071m) VDLF Kyle Road
(£0.216m) Other minor adjustments
(£6.973m)
Other (£2.521m) Flexibility Fund
(£2.521m)
Corporate £3.090m Uncertainty / Sensitivity Adjustment
£3.090m
Total (£7.379m)
86

Page 87

These adjustments have been partly offset by the acceleration of £0.420m of
expenditure to 2022/23 from future years. 
2.5 These adjustments have resulted in a revised 2022/23 budget at 31 January 2023 of
£42.709m. 
2.6 The following graph illustrates the movement in each programme on a service basis
compared to the revised programme: 
Service Amount Project
Chief Executives £0.053m Schools ICT Investment
Place £0.078m PLI Auchenharvie Academy
£0.198m Kilwinning Cemetery
£0.075m Other minor adjustments
£0.351m
Communities £0.016m Other minor adjustments
£0.016m
Total £0.420m
38.672 32.249 0.492 50.239 2.500 124.152
25.201 8.948 2.002 43.502 (10.019) 69.634
25.196 6.764 1.672 38.451 (8.321) 63.762
9.045 2.555 1.578 40.231 (4.782) 48.627
8.573 2.366 1.262 34.676 (4.064) 42.813
(30.099) (29.883) 0.770 (15.563) (6.564) (81.339)
Approved Programme
Movement
Programme @ P6
Programme @ P4
Programme @ P10
Programme @ P8
87

Page 88

2.7  The impact on budgeted funding, elements of which are related to the profile of
expenditure reported above, is a reduction of £5.814m from the revised budget,
including: 
2.8 Projected Capital Expenditure to 31 March 2023 
The projections are summarised by service in the following table:   
2.9 Minor underspends totalling £0.104m have been reported in relation to completed
projects, including Annick Primary ELC Extension, £0.098m; Our Future Working
Environment, £0.001m; and Largs Car Park Infrastructure, £0.005m. These funds will
be transferred to the Flexibility budget to offset anticipated budget pressures
elsewhere in the programme. Information on the progress of all projects can be found
in Appendix 1. 
Category Amount Comments
Borrowing £2.268m Rephased aligned to projected expenditure
CFCR (£0.063m) Additional CFCR Contribution
Capital Grants £2.995m Rephased and additional government grants
Other Grants £0.360m Rephased and revised contributions
Capital Receipts £0.254m Realigned capital receipts
Total £5.814m
Revised
Budget
2022/23
Budget
Revisions
Carry
Forwards
and
Adjustments
Revised
Budget
2022/23
Projected
Expenditure
/ Income to
31 March
2023
Projected
Variance
Over /
(Under)
£m £m £m £m £m £m
Expenditure
Communities 9.045 0.069 (0.541) 8.573 8.475 (0.098)
Chief Executive 2.555 - (0.189) 2.366 2.365 (0.001)
Health and Social Care Partnership 1.578 (0.140) (0.176) 1.262 1.262 -
Place 40.231 1.067 (6.622) 34.676 34.671 (0.005)
Other including Flexibility (4.782) 0.149 0.569 (4.064) (4.064) -
Total Expenditure 48.627 1.145 (6.959) 42.813 42.709 (0.104)
Income
General Capital Grant (26.341) - - (26.341) (26.341) -
Specific Capital Grant (12.189) (1.208) 4.203 (9.194) (9.194) -
Capital Funded from Current Revenue (0.018) (0.063) - (0.081) (0.081) -
Capital Receipts (0.466) - 0.254 (0.212) (0.212) -
Other Grants & Contributions (3.039) 0.126 0.234 (2.679) (2.679) -
Prudential Borrowing (6.574) - 2.268 (4.306) (4.202) 0.104
Total Income (48.627) (1.145) 6.959 (42.813) (42.709) 0.104
88

Page 89

2.10 Although not formally reflected in the financial performance reports at this time due to
ongoing uncertainty, areas of cost risk have been identified as a result of cost volatility
arising from the ongoing inflationary pressures, outstanding contractor claims and
supply chain issues which are impacting on tender returns and the cost of materials
across a number of projects, as highlighted in appendix 1. Some mitigation has been
built into the Capital Investment Programme in the form of enhanced flexibility
budgets. However, cost pressures may exceed this provision, requiring additional
revenue investment to offset any additional borrowing requirements. These risks will
be quantified as individual projects are completed and tendering exercises are
finalised, with the impact on the costs of the programme being monitored and reported
to Cabinet as appropriate. Any funding in excess of the current level of financial
flexibility, which is required to deliver the current capital programme, will be a matter
for Council to consider within the context of overall affordability. This affordability
assessment was included in the Capital Budget approved at Council on 1 March 2023
and incorporated all known cost pressures, funding and borrowing requirements
based on current and projected interest rates, the anticipated re-direction of revenue
resources and use of financial flexibilities to support delivery of the programme and a
further flexible allowance to help manage the ongoing cost risks associated with the
programme.   
2.11 Following the completion of the P10 projections detailed in this report, the tender
exercise in relation to the Solar PV developments at Shewalton and Nethermains has
been completed as noted below: 
It is currently estimated that the additional borrowing costs associated with the
£0.781m additional investment would result in additional revenue costs of £0.060m
per annum. It is anticipated that these additional borrowing costs can be met from the
net annual income projected from the generation of electricity and it is requested that
Cabinet approve the updating of the Capital Investment Programme on this basis. 
Nethermains Shewalton Total
£m £m £m
Approved Funding
Prudential Borrowing £2.268m - £2.268m
Investment Fund £4.500m £1.400m £5.900m
Recovery & Renewal Fund - £3.880m £3.880m
Total £6.768m £5.280m £12.048m
Tender Values £7.289m £5.540m £12.829m
Additional Costs £0.521m £0.260m £0.781m
89

Page 90

Housing Revenue Account 
2.12 The following table outlines the movements in the 2022/23 HRA Capital budget: 
2.13  (a) Alterations to the Phasing of Projects 
A further review of the timescale for delivery of capital projects has identified a
requirement to re-profile (£15.302m) of works for delivery in 2023/24 and beyond,
including: 
2022/23
£m
Budget as at 30 November 2022 57.768       
a) Alterations to phasing of projects:-
2022/23 to 2023/24 (15.302)           
2023/24 to 2022/23 0.985         
Budget as at 31 January 2023 43.451       
Category Amount Project
New Builds (£2.150m) James McFarlane ASN
(£1.750m) Stanecastle ASN
(£1.700m) Garnock Academy
(£1.542m) Council House Building General
(£1.450m) New Build Montgomerie Park
(£1.400m) Ayrshire Central
(£1.005m) James Reid ASN
(£0.005m) Other Minor Adjustments
(£11.002m)
Improvements (£0.152m) Kitchen Programme Voids
(£0.068m) Other minor adjustments
(£0.220m)
Refurbishments (£0.731m) Demolition High Flats Irvine
(£0.215m) Window Replacement
(£0.159m) Kitchen Programme
(£0.001m) Other minor adjustments
(£1.106m)
Other (£1.820m) Solar Panels
(£0.711m) Other Capital Works
(£0.207m) Health & Safety Works
(£0.180m) Energy Efficiency Standard
(£0.056m) Other minor adjustments
(£2.974m)
Total (£15.302m)
90

Page 91

This has been partly offset by the acceleration of £0.985m of project expenditure for
delivery during 2022/23, including: 
2.14 These adjustments have resulted in a revised 2022/23 budget at 31 January 2023 of
£43.451m. 
2.15 The impact on budgeted funding is a reduction of £14.317m in Prudential Borrowing
aligned to the revised projected expenditure. 
2.16  Projected Capital Expenditure to 31 March 2023 
The projections are summarised in the following table:   
Category Amount Project
New Builds £0.357m New Build Flatt Road Phase 1
£0.193m New Build St Michaels Wynd
£0.115m New Build Afton Court
£0.109m New Build Brathwic Terrace
£0.159m Other minor adjustments
£0.933m
Improvements £0.018m Bathroom Programme
Refurbishments £0.034m Friars Lawn
Total £0.985m
Revised
Budget
2022/23
Carry
Forwards
and
Adjustments
Revised
Budget
2022/23
Projected
Expenditure /
Income to 31
March 2023
Projected
Variance
Over /
(Under)
Service £m £m £m £m £m
Expenditure
Housing Revenue Account 57.768 (14.317) 43.451 34.349 (9.102)
Total Expenditure 57.768 (14.317) 43.451 34.349 (9.102)
Income
CFCR (12.209) (12.209) (12.209) -
Capital Grants (1.767) (1.767) (1.767) -
Use of Reserves (1.151) (1.151) (1.151) -
Affordable Housing Contribution (1.596) (1.596) (1.596) -
Prudential Borrowing (41.045) 14.317 (26.728) (17.626) 9.102
Total Income (57.768) 14.317 (43.451) (34.349) 9.102
91

Page 92

2.17 A variance of (£9.102m) is projected within the HRA capital programme for 2022/23
arising from revisions to a number of projects, including: 
2.18 Increased costs arising from tender inflation and supply chain issues have been
identified in relation to some projects, including the Door Replacement Programme
and Sheltered Housing Unit Improvements. Further cost pressures resulting from
inflationary and supply chain issues continue to be monitored and a review of the
potential impact on the Business Plan and Capital Programme will be undertaken to
address any identified issues. Further information on the progress of all projects can
be found in Appendix 2. 
3. Proposals 
3.1 That Cabinet agrees to (a) note the revisions to budgets outlined in the report; (b) note
(i) the General Services and HRA revised budgets at 31 January 2023; and (ii) the
forecast expenditure to 31 March 2023; and (c) approve the proposed revision to the
General Services Capital Programme in respect of the additional borrowing
requirement to support the Shewalton and Nethermains Solar PV projects. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Expenditure will continue to be
closely monitored to ensure early action is taken regarding any projected
underspends or overspends. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Project Variance Comments
Kitchen Programme (£2.997m) Aligned to revised Business Plan and labour
shortages
Roofing & Rendering (£2.145m) Aligned to revised Business Plan
Electrical Rewiring (£1.532m) Aligned to revised Business Plan and labour
shortages
Insulated Re-rendering (£1.480m) Aligned to revised Business Plan and labour
shortages
Central Heating (£0.948m) Aligned to revised Business Plan
Total (£9.102m)
92

Page 93

Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Capital Programme Performance to 31 March 2023 – Cabinet, 24 January 2023 
93

Page 94

Appendix 1
TOTAL PROJECT
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2022/23
Brought / Carry
Forward to 2023/24
Total Revised
Budget 2022/23
Year to Date Budget
2022/23
Actual Expenditure to
31 January 2023
Year to date
Variance 2022/23
Projected Expenditure
to 31st March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend
£ £ £ £ £ £ £ £ £ £ £ £ £
EXPENDITURE
Communities
Nursery Education 15,860,427 15,422,071 15,762,427 (98,000) 2,350,765 (91,599) 2,259,166 0 1,912,409 1,912,409 2,161,166 (98,000) (98,000)
Primary Schools 35,676,441 5,831,314 35,676,441 0 4,692,399 (302,871) 4,389,528 0 2,866,347 2,866,347 4,389,528 0 0
Secondary Schools 74,575,465 3,839,126 74,575,465 0 919,053 0 919,053 0 541,087 541,087 919,053 0 0
Special Education 25,443,178 25,295,310 25,443,178 0 903,203 0 903,203 0 755,336 755,336 903,203 0 0
Schools Other 298,000 151,457 298,000 0 191,892 (146,543) 45,349 0 45,349 45,349 45,349 0 0
Information & Culture 125,916 16,470 125,916 0 53,289 0 53,289 0 9,907 9,907 53,289 0 0
Completed Projects 43,419,379 43,395,373 43,419,379 0 3,679 0 3,679 0 (20,327) (20,327) 3,679 0 0
SUB TOTAL 195,398,806 93,951,121 195,300,806 (98,000) 9,114,280 (541,013) 8,573,267 0 6,110,106 6,110,106 8,475,267 (98,000) (98,000)
Chief Executive
Council IT Strategy 9,840,210 3,809,256 9,839,597 (613) 2,555,286 (189,552) 2,365,734 0 2,297,528 2,297,528 2,365,121 (613) (613)
SUB TOTAL 9,840,210 3,809,256 9,839,597 (613) 2,555,286 (189,552) 2,365,734 0 2,297,528 2,297,528 2,365,121 (613) (613)
Health & Social Care
Management & Support 2,050,595 790,721 2,050,595 0 217,029 0 217,029 0 46,964 46,964 217,029 0 0
Housing Non HRA 686,065 441,464 686,065 0 686,065 (156,065) 530,000 0 441,464 441,464 530,000 0 0
Adults 4,608,078 4,588,276 4,608,078 0 46,804 (19,936) 26,868 0 27,002 27,002 26,868 0 0
Young People 5,579,718 5,216,166 5,579,718 0 487,982 0 487,982 0 124,430 124,430 487,982 0 0
SUB TOTAL 12,924,457 11,036,627 12,924,457 0 1,437,880 (176,001) 1,261,879 0 639,861 639,861 1,261,879 0 0
Place
Roads 107,634,049 26,604,339 107,628,516 (2,736,214) 16,643,800 (2,730,681) 13,913,119 0 9,280,655 9,280,655 13,907,586 (5,533) (5,533)
Streetscene 6,580,996 2,900,769 6,580,996 0 2,268,848 (37,924) 2,230,924 0 1,481,239 1,481,239 2,230,924 0 0
Transport 4,668,111 1,036,281 4,668,111 0 2,802,511 (113,000) 2,689,511 0 920,681 920,681 2,689,511 0 0
Waste Services 14,844,503 14,844,503 14,844,503 0 305,160 0 305,160 0 305,160 305,160 305,160 0 0
Renewable Energy 8,890,393 1,726,700 8,890,393 0 1,067,368 (356,000) 711,368 0 128,236 128,236 711,368 0 0
Office Accommodation 3,331,321 745,943 3,331,321 0 1,918,188 (221,020) 1,697,168 0 745,943 745,943 1,697,168 0 0
Other Property 5,986,638 440,307 5,986,638 0 987,925 (25,682) 962,243 0 57,677 57,677 962,243 0 0
Other Housing 350,000 0 350,000 0 350,000 0 350,000 0 0 0 350,000 0 0
Economic Development & Regeneration 152,281,929 28,312,101 152,281,929 0 14,913,347 (3,096,834) 11,816,513 0 6,389,025 6,389,025 11,816,513 0 0
Completed Projects 6,390,674 6,311,034 6,390,674 0 40,595 (40,595) 0 0 (28,842) (28,842) 0 0 0
SUB TOTAL 310,958,614 82,921,978 310,953,081 (2,736,214) 41,297,742 (6,621,736) 34,676,006 0 19,279,774 19,279,774 34,670,473 (5,533) (5,533)
Other
Other 9,474,863 0 7,562,125 (1,912,738) 2,520,738 (2,520,738) 0 0 0 0 0 0 0
SUB TOTAL 9,474,863 0 7,562,125 (1,912,738) 2,520,738 (2,520,738) 0 0 0 0 0 0 0
Uncertainty / Sensitivity Adjustment* (4,064,230) (4,064,230) (4,064,230)
Total Project Expenditure 538,596,951 191,718,982 536,580,067 (4,747,565) 56,925,926 (14,113,270) 42,812,656 0 28,327,269 28,327,269 42,708,510 (104,146) (104,146)
Total Project Income (56,925,926) 14,113,270 (42,812,656) (37,269,953) (37,269,953) 0 (42,708,510) 104,146 104,146
Total Net Expenditure 0 0 0 (37,269,953) (8,942,684) 28,327,269 0 0 0
* Sensitivity adjustment of 10% or 25% based on source and reliability of expenditure projections
On Target (+0.5% of budget) On Target (up to  5% delay of original timescales)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less) Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less) Significantly off target (+10% or more of original timescales)
The following classifications have been used to highlight financial performance against
budget
CURRENT YEAR 2022/23
North Ayrshire Council Capital Statement 2022/23
Year Ended 31st March 2023
Period 10
The following classifications have been used to highlight delivery performance
against original timescales set
94

Page 95

Revised Budget
22/23 Variance
£ £ £ £ £ £ £ £ £
CAPITAL BORROWING
Prudential Borrowing 94,515,334 9,882,875 1,655,477 106,053,686 (90,238,701) 15,814,985 8,265,765 (7,549,220)
SUB TOTAL 94,515,334 9,882,875 1,655,477 106,053,686 (90,238,701) 0 15,814,985 0 8,265,765 (7,549,220)
SCOTTISH GOVERNMENT FUNDING
Specific Capital Grants
Early Learning & Childcare 464,253 517,775 982,028 0 982,028 978,659 922,822 (59,206)
Cycling / Walking /Safer Streets 1,111,122 38,831 (300,566) 849,387 (252,322) 597,065 261,387 597,065 0
Vacant & Derelict Land Funding 3,710,375 123,927 848,022 4,682,324 (2,476,215) 2,206,109 4,252,324 2,013,629 (192,480)
UK Government Grant - AGD 2,040,120 2,040,120 (1,832,120) 208,000 0 208,000 0
Lochshore - Garnock Community Visitor Hub 0 50,000 50,000 0 50,000 50,000 50,000 0
Town Centre Regeneration 0 166,774 250,000 416,774 0 416,774 416,773 276,774 (140,000)
Stevenston Beach Hub 0 34,525 50,000 84,525 0 84,525 84,525 84,525 0
Annickbank - Vacant & Derelict Land Investment Programme 400,000 400,000 0 400,000 0
Millport Town Hall Regeneration 0 382,028 1,187,810 1,569,838 0 1,569,838 1,569,838 1,317,309 (252,529)
Millport Town Hall Phase 2 509,450 509,450 0 349,952 (159,498)
Islands Pit Stops 540,000 540,000 0 20,000 (520,000)
Islands Cost Crisis Emergency Fund 17,000 17,000 0 17,000 0
Place Based Investment Programme 706,000 147,903 346,040 1,199,943 1,093,000 2,292,943 2,292,944 1,344,107 (948,836)
UK Shared Prosperity Fund 98,414 98,414 98,414 0 (98,414)
Island Infrastructure Fund 0 259,000 259,000 0 259,000 259,000 259,000 0
Bridges Infrastructure 567,000 (567,000) 0 0 0 0 0 0
B714 Improvements 857,907 197,160 1,055,067 156,933 1,212,000 1,212,000 1,212,000 0
Renewal of Play Parks 0 117,000 117,000 (117,000) 0 0 0 0
Nature Restoration Fund 0 0 0 0 0 0 0
CO2 Monitors in Schools 0 122,000 122,000 0 122,000 122,000 122,000 0
Capital Grants
Flooding 2,778,000 2,778,000 8,676,000 11,454,000 0 11,454,000 0
General Capital Grant 9,805,000 845,000 10,650,000 4,237,000 14,887,000 24,103,000 14,887,000
SUB TOTAL 22,039,777 1,780,923 3,035,306 26,856,006 11,050,140 0 37,906,146 35,700,863 35,535,183 (2,370,963)
OTHER INCOME TO PROGRAMME
Use of Funds :-
Capital Fund 4,718,975 140,833 88,942 4,948,750 (4,948,750) 0 0 0 0 0
Change & Service Redesign Fund 0 42,682 0 42,682 (42,682) 0 0 0 0 0
CFCR 600,000 0 0 600,000 (518,835) 0 81,165 0 81,165 0
Grants & Contributions 1,925,682 866,594 1,539,395 4,331,671 (1,418,689) 0 2,912,982 1,360,092 2,678,629 (234,353)
Capital Receipts 352,500 0 0 352,500 (141,852) 0 210,648 208,998 211,998 1,350
TOTAL CAPITAL PROGRAMME FUNDING 124,152,268 12,713,907 6,319,120 143,185,295 (86,259,369) 0 56,925,926 37,269,953 46,772,740 (10,153,186)
22/23 Budget at
Capital Refresh
Mar 2022
Capital Programme Funding 2022/23
Projected Income
to 31st March
2023
Approved budget
at Period 1 used
as revised starting
point 2022/23
Actual Income to 31
January 2023Funding Description
Carry Forward
from 2021/22
Changes after
Capital Refresh Mar
2022
Total Changes in
Year
Changes at Capital
Refresh Mar 2023
95

Page 96

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Year to Date Budget
2022/23
Actual Expenditure to
31 January 2023
Year to date Variance
2022/23
Projected
Expenditure to 31
March 2023
Actual Over/ (Under)
Spend for 2022/23   
True Over/(Under)
Spend            
Brought / Carry
Forward to 2023/24 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £ £ £ £
Nursery Education
Early Years Programme
ST BRIDGETS EARLY YEARS 785,068 770,580 785,068 0 7,969 0 (6,519) (6,519) 7,969 0 0 Complete Complete Complete On Target On Target
KILMORY EARLY YEARS 55,978 28,117 55,978 0 27,986 0 125 125 195 (27,791) (27,791) 15-Aug-22 31-Aug-23 Pre Tender On Target On Target
ST PETERS EARLY YEARS 1,261,310 1,226,705 1,261,310 0 42,333 0 7,728 7,728 25,646 (16,687) (16,687) Complete Complete Complete On Target On Target
ST JOHN OGILVIE EARLY YEARS 177,415 177,415 177,415 0 0 0 0 0 0 0 0 Complete Complete Complete On Target On Target
MAYFIELD PS EARLY YEARS 215,850 215,542 215,850 0 5,820 0 5,512 5,512 5,820 0 0 Complete Complete Complete On Target On Target
BEITH PS EARLY YEARS 341,321 339,763 341,321 0 6,540 0 4,983 4,983 6,540 0 0 Complete Complete Complete On Target On Target
SKELMORLIE PS EARLY YEARS 366,440 346,635 366,440 0 11,492 0 (8,313) (8,313) 11,492 0 0 Complete Complete Complete On Target On Target
WEST KILBRIDE EARLY EARLY YEARS 232,807 220,254 232,807 0 11,531 0 (1,022) (1,022) 11,531 0 0 Complete Complete Complete On Target On Target
GATESIDE EARLY YEARS 407,478 407,478 407,478 0 2,613 0 2,612 2,612 2,613 0 0 Complete Complete Complete On Target On Target
GARNOCK CAMPUS EARLY YEARS 58,755 58,755 58,755 0 0 0 0 0 0 0 0 Complete Complete Complete On Target On Target
FAIRLIE EARLY YEARS 204,528 204,528 204,528 0 878 0 878 878 878 0 0 Complete Complete Complete On Target On Target
ELDERBANK EARLY YEARS 22,983 22,983 22,983 0 0 0 0 0 0 0 0 Complete Complete Complete On Target On Target
DREGHORN EARLY YEARS 84,784 82,843 84,784 0 2,341 0 400 400 2,341 0 0 Complete Complete Complete On Target On Target
CUMBRAE EARLY YEARS 40,184 40,184 40,184 0 0 0 0 0 0 0 0 Complete Complete Complete On Target On Target
LARGS CAMPUS EARLY YEARS 45,836 45,836 45,836 0 0 0 0 0 0 0 0 Complete Complete Complete On Target On Target
MOORPARK EARLY YEARS 1,000 182 1,000 0 818 0 0 0 818 0 0 14-Aug-20 15-Aug-22 Development On Target On Target
PIRNMILL EARLY YEARS 80,000 51,433 80,000 0 77,510 0 48,944 48,944 77,510 0 0 31-Oct-21 30-Apr-23 Construction On Target On Target
SHISKINE EARLY YEARS 74,808 120,031 74,808 0 18,650 0 63,872 63,872 18,650 0 0 31-Oct-21 30-Apr-23 Construction On Target On Target
CORRIE EARLY YEARS 38,606 24,708 38,606 0 37,046 0 23,149 23,149 36,441 (605) (605) 31-Oct-21 01-Aug-23 Defects On Target On Target
LAMLASH EARLY YEARS 15,000 807 15,000 0 14,318 0 125 125 195 (14,123) (14,123) 31-Oct-21 31-Aug-23 Tender On Target On Target
BRODICK EARLY YEARS 342,590 322,508 342,590 0 334,151 0 314,070 314,070 334,151 0 0 Complete Complete Complete Complete Complete
MARRESS HOUSE 3,460,332 3,338,890 3,460,332 0 1,532,990 0 1,411,548 1,411,548 1,532,990 0 0 22-Jul-22 31-May-23 Construction On Target Significantly off target result of poor performance by the contractor and continuing issues
with the condition of the existing building
Completed Nursery Education
LAWTHORN EARLY YEARS 201,037 201,037 201,037 0 77 0 77 77 77 0 0 Complete Complete Complete Complete Complete
Other Nursery Education
ANNICK PRIMARY EXT - EARLY YRS PROVISION 3,201,415 3,029,954 3,103,415 (98,000) 215,702 0 44,241 44,241 85,309 (130,393) (98,000) (32,393) Complete Complete Complete On Target On Target
Total Nursery Education 15,860,427 15,422,071 15,762,427 (98,000) 2,350,765 0 1,912,409 1,912,409 2,161,166 (189,599) (98,000) (91,599)
Primary Schools
MOORPARK PRIMARY 10,849,442 4,831,726 10,849,442 0 3,086,371 0 2,017,289 2,017,289 3,086,371 0 0 30-Sep-22 30-Sep-23 Construction Slightly off target  Significantly off target Delays are being experienced by the contractor and wider supply
chain.
MONTGOMERIE PARK SCHOOL 14,470,000 649,380 14,470,000 0 884,778 0 499,111 499,111 736,478 (148,300) (148,300) 30-Apr-24 12-Aug-24 Tender Significantly off target On Target Revised project costs £2.550m above initial budget as reported to
Cabinet on 27/4/22
UNIVERSAL FREE SCHOOL MEALS EXPANSION 2,626,572 0 2,626,572 0 159,572 0 0 0 0 (159,572) (159,572) 31-Mar-24 31-Mar-24 Tender On Target On Target
UFSM BRODICK PRIMARY SCHOOL 177,928 106,159 177,928 0 144,178 0 106,159 106,159 144,178 0 0 Complete Complete Complete Complete Complete
UFSM CORRIE PRIMARY SCHOOL 52,500 44,306 52,500 0 52,500 0 44,306 44,306 52,500 0 0 Complete Complete Complete Complete Complete
UFSM LARGS PRIMARY SCHOOL 195,000 19,271 195,000 0 150,000 0 19,271 19,271 150,000 0 0 Complete Complete Complete Complete Complete
UFSM SHISKINE PRIMARY SCHOOL 15,000 24,678 15,000 0 15,000 0 24,678 24,678 3,553 (11,447) (11,447) Complete Complete Complete Complete Complete
UFSM WEST KILBRIDE PRIMARY SCHOOL 2,500,000 155,794 2,500,000 0 200,000 0 155,532 155,532 216,448 16,448 16,448 31-Aug-24 31-Jan-23 Tender On Target On Target
Total Primary Education 35,676,441 5,831,314 35,676,441 0 4,692,399 0 2,866,347 2,866,347 4,389,528 (302,871) 0 (302,871)
Secondary Schools
KILWINNING LEARNING ENVIRONMENT 2,805,435 2,426,731 2,805,435 0 127,953 0 72,329 72,329 127,953 0 0 31-Aug-21 31-Mar-24 Construction On Target On Target
AYRSHIRE COLLEGE PARTNERSHIP DEVELOPMENT 200,000 0 200,000 0 200,000 0 0 0 200,000 0 0 31-Mar-22 31-Jan-23 Future Years On Target On Target
ARDROSSAN NEW BUILD 71,570,030 1,412,395 71,570,030 0 591,100 0 468,758 468,758 591,100 0 0 31-Aug-26 31-Aug-26 In Development Slightly off target  Slightly off target  Delayed expenditure linked to anticipated delays and inflationary
pressures linked to the advance works tender process.
Total Secondary Education 74,575,465 3,839,126 74,575,465 0 919,053 0 541,087 541,087 919,053 0 0 0
Special Education
LOCKHART CAMPUS 25,443,178 25,295,310 25,443,178 0 903,203 0 755,336 755,336 903,203 0 0 Complete Complete Snagging On Target On Target
Total Special Education 25,443,178 25,295,310 25,443,178 0 903,203 0 755,336 755,336 903,203 0 0 0
Schools Other
CO2 MONITORS IN SCHOOLS 298,000 151,457 298,000 0 191,892 0 45,349 45,349 45,349 (146,543) (146,543) 31-Mar-23 31-Mar-24 Planning On Target On Target
Total Schools Other 298,000 151,457 298,000 0 191,892 0 45,349 45,349 45,349 (146,543) 0 (146,543)
Information & Culture
CASTLES & HISTORIC MONUMENTS 50,740 9,907 50,740 0 50,740 0 9,907 9,907 50,740 0 0 Holding Code Holding Code Holding Code Holding Code Holding Code
ABBEY TOWER 75,176 6,563 75,176 0 2,549 0 0 0 2,549 0 0 Autumn 2023 Autumn 2023 Planning On Hold On Hold
Total Information & Cultural 125,916 16,470 125,916 0 53,289 0 9,907 9,907 53,289 0 0 0
Completed Projects
GARNOCK CAMPUS 40,307,259 40,284,039 40,307,259 0 2,893 0 (20,327) (20,327) 2,893 0 0 Complete Complete Complete Complete Complete
AUCHENHARVIE SECONDARY ESTATE LEARNING ENVT 3,112,120 3,111,334 3,112,120 0 786 0 0 0 786 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 43,419,379 43,395,373 43,419,379 0 3,679 0 (20,327) (20,327) 3,679 0 0 0
Total Communities 195,398,806 93,951,121 195,300,806 (98,000) 9,114,280 0 6,110,106 6,110,106 8,475,267 (639,013) (98,000) (541,013)
CAPITAL MONITORING 2022/23
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2022/23 BUDGETS
96

Page 97

CHIEF EXECUTIVE
MILESTONE
Total Project Budget                   
Cumulative
Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Year to Date
Budget 2022/23
Actual
Expenditure to 31
January 2023
Year to Date
Variance 2022/23
Projected Expenditure
to 31 March 2023 
Actual Over/
(Under) Spend for
2022/23
True Over/(Under)
Spend          
Brought / Carry
Forward to
2023/24
Original Target Revised Forecast Current Project
Stage
Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £ £ £ £
Council IT Strategy
SCHOOLS ICT INVESTMENT * 1,297,915 1,350,363 1,297,915 0 1,297,915 0 1,350,363 1,350,363 1,350,363 52,448 52,448 31-Mar-23 31-Mar-23 On-going On Target On Target
ICT INVESTMENT FUND 3,822,986 936,131 3,822,986 0 430,000 0 306,341 306,341 330,000 (100,000) (100,000) 31-Mar-26 31-Mar-26 On-going On Target On Target
WAN 857,100 352,453 857,100 0 94,297 0 89,649 89,649 94,297 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
LAN/WiFi 2,673,000 930,505 2,673,000 0 691,816 0 559,321 559,321 561,816 (130,000) (130,000) 31-Mar-28 31-Mar-28 Implementation On Target On Target
TELEPHONY 1,146,693 197,902 1,146,693 0 36,988 0 (11,803) (11,803) 24,988 (12,000) (12,000) 31-Mar-28 31-Mar-28 Implementation On Target On Target
OUR FUTURE WORKING ENVIRONMENT 42,516 41,903 41,903 (613) 4,270 0 3,657 3,657 3,657 (613) (613) 0 Complete Complete Complete Complete Complete
Total IT Strategy 9,840,210 3,809,256 9,839,597 (613) 2,555,286 0 2,297,528 2,297,528 2,365,121 (190,165) (613) (189,552)
Total Chief Executive 9,840,210 3,809,256 9,839,597 (613) 2,555,286 0 2,297,528 2,297,528 2,365,121 (190,165) (613) (189,552)   
CAPITAL MONITORING 2022/23
CommentsProject Description
COMPLETION DATESTOTAL PROJECT DELIVERY STATUS2022/23 BUDGETS
97

Page 98

HEALTH & SOCIAL CARE
MILESTONE
Total Project
Budget                   
Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Year to Date Budget
2022/23
Actual Expenditure to
31 January 2023
Year to Date Variance
2022/23
Projected Expenditure
to 31 March 2023
Actual Over/
(Under) Spend for
2022/23
True Over/(Under)
Spend          
Brought / Carry
Forward to 2023/24   Original Target Revised Forecast Current Project
Stage
Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £ £ £ £
Management & Support
HOME CARE SYSTEM 433,917 433,917 433,917 0 42,682 0 42,682 42,682 42,682 0 0 Complete Complete Complete Complete Complete
COMMUNITY ALARMS - ANALOGUE TO DIGITAL 996,000 4,190 996,000 0 6,190 0 4,190 4,190 6,190 0 0 31-Dec-23 31-Dec-23 Future Years On Target On Target
CAREFIRST REPLACEMENT 536,058 267,993 536,058 0 168,157 0 92 92 168,157 0 0 31-Aug-24 31-Aug-24 In development On Target On Target
Total Management & Support 2,050,595 790,721 2,050,595 0 217,029 0 46,964 46,964 217,029 0 0 0
Housing Non HRA
IMPROVEMENT GRANTS * 686,065 441,464 686,065 0 686,065 0 441,464 441,464 530,000 (156,065) (156,065) 31-Mar-23 31-Mar-23 Ongoing On Target On Target 
Total Housing Non HRA 686,065 441,464 686,065 0 686,065 0 441,464 441,464 530,000 (156,065) 0 (156,065)
Adults
TRINDLEMOSS 4,608,078 4,588,276 4,608,078 0 46,804 0 27,002 27,002 26,868 (19,936) (19,936) Complete Complete Complete Complete Complete
Total Older People 4,608,078 4,588,276 4,608,078 0 46,804 0 27,002 27,002 26,868 (19,936) 0 (19,936)
Young People
RESIDENTIAL & RESPITE UNIT 5,579,718 5,216,166 5,579,718 0 487,982 0 124,430 124,430 487,982 0 0 Complete Complete Snagging On Target On Target
Total Young People 5,579,718 5,216,166 5,579,718 0 487,982 0 124,430 124,430 487,982 0 0 0
Total Health & Social Care 12,924,457 11,036,627 12,924,457 0 1,437,880 0 639,861 639,861 1,261,879 (176,001) 0 (176,001)
CAPITAL MONITORING 2022/23
2022/23 BUDGETSTOTAL PROJECT COMPLETION DATES
CommentsProject Description
DELIVERY STATUS
98

Page 99

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Year to Date
Budget 2022/23
Actual
Expenditure to 31
January 2023
Year to Date
Variance 2022/23
Projected
Expenditure to 31
March 2023    
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend         
Brought / Carry
Forward to
2023/4
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £ £ £ £
PHYSICAL ENVIRONMENT
Roads
ROADS IMPROVE/RECONSTRUCTION * 4,814,795 4,814,795 4,814,795 0 4,814,795 0 4,439,975 4,439,975 4,814,795 0 0 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
A737 DALRY BYPASS 210,000 136,000 210,000 0 210,000 0 85,699 85,699 136,000 (74,000) (74,000) 31-Mar-24 31-Mar-24 In Development On Target On Target
TRAFFIC CALMING 175,000 9,980 175,000 0 100,000 0 9,980 9,980 100,000 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
VEHICLE RESTRAINT SYSTEM UPGRADE 100,000 0 100,000 0 100,000 0 0 0 100,000 0 0 31-Mar-23 31-Mar-23 In Development On Target On Target
LIGHTING * 1,587,827 908,556 1,587,827 0 1,587,827 0 908,556 908,556 1,244,770 (343,057) (343,057) 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
LED LIGHTING REPLACEMENT 695,000 200,700 695,000 0 492,190 0 200,700 200,700 329,690 (162,500) (162,500) 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
A737 DALRY BYPASS LIGHTING 20,685 0 20,685 0 20,685 0 0 0 6,485 (14,200) (14,200) 31-Mar-23 31-Mar-23 Preparing Works PackagesOn Target On Target
UPPER GARNOCK FPS 18,503,800 17,351,773 18,503,800 0 3,454,934 0 2,302,907 2,302,907 3,154,934 (300,000) (300,000) Complete Complete Complete Slightly off target  Slightly off target  The contractor did not achieve the programme before winter. The
drainage and topsoiling/ seeding cannot be completed until next
spring
MILLPORT COASTAL FPS 48,599,796 1,306,302 48,599,796 0 3,000,000 0 41,506 41,506 1,300,000 (1,700,000) (1,700,000) 31-Aug-24 31-Aug-24 Construction On Target On Target
MILLBURN FPS 1,757,000 194,541 1,757,000 0 60,000 0 7,523 7,523 60,000 0 0 31-Mar-23 31-Jul-24 Design On Target Significantly off Delays in the design process
BRIDGES INFRASTRUCTURE PROG * 1,000,000 621,165 1,000,000 0 1,000,000 0 621,165 621,165 1,000,000 0 0 31-Mar-23 31-Mar-23 Multiple Projects On Target On Target
LARGS PROMENADE SEAWALL 3,039,000 302,224 3,039,000 0 160,840 0 191,596 191,596 191,596 30,756 30,756 31-Oct-23 31-Oct-23 Tender Slightly off target  On Target Increased tender cost risks identified
B714 UPGRADE 26,063,443 462,662 26,063,443 0 1,212,000 0 462,662 462,662 1,212,000 0 0 31-Mar-25 31-Mar-25 Outline Design Significantly off target On Target Increased tender cost risks identified
LARGS CAR PARK INFRASTRUCTURE 60,000 54,467 54,467 (5,533) 5,533 0 0 0 0 (5,533) (5,533) 0 Complete Complete Complete Complete Complete
GALLOWGATE TOILETS 250,000 3,977 250,000 0 247,316 0 1,294 1,294 247,316 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PARKING CHARGES & DPE 257,705 87,119 257,705 0 177,680 0 7,095 7,095 10,000 (167,680) (167,680) 31-Mar-24 31-Mar-24 In Development On Target On Target
Total Roads 107,634,049 26,604,339 107,628,516 (5,533) 16,643,800 0 9,280,655 9,280,655 13,907,586 (2,736,214) (5,533) (2,730,681)
Streetscene
LAMLASH CEMETERY EXTENSION 715,065 715,065 715,065 0 30,540 0 30,540 30,540 30,540 0 0 Complete Complete Complete Complete Complete
HIGH KIRK CEMETERY 0 767 0 0 0 0 767 767 0 0 0 On Target On Target
DREGHORN CEMETERY 0 1,110 0 0 0 0 1,110 1,110 0 0 0 On Target On Target
ARDROSSAN CEMETERY PLOTS AND WALLS 217,922 151,142 217,922 0 67,219 0 439 439 55,921 (11,298) (11,298) Complete Complete Complete Complete Complete
KILBIRNIE CEMETERY 623,833 34,605 623,833 0 9,223 0 9,223 9,223 9,223 0 0 31-Mar-25 31-Mar-25 Feasibility Works On Hold On Hold
KILWINNING CEMETERY NEW 1,240,642 926,124 1,240,642 0 953,868 0 837,678 837,678 1,152,196 198,328 198,328 01-Sep-22 31-May-23 Construction On Target Significantly off Contractor appointed and work commenced
KNADGERHILL CEMETERY EXTENSION 443,581 390,453 443,581 0 49,340 0 (3,787) (3,787) 49,340 0 0 01-Oct-22 31-Mar-23 Construction On Target On Target
WEST KILBRIDE CEMETERY 349,622 218,694 349,622 0 310,902 0 187,481 187,481 310,902 0 0 25-Nov-22 28-Feb-24 Construction On Target On Target
STEVENSTON CEMETERY 545,429 206,281 545,429 0 467,991 0 162,453 162,453 365,961 (102,030) (102,030) 23-Dec-22 30-Apr-23 Construction On Target On Target
ARDROSSAN CEMETERY NEW 900,603 603 900,603 0 0 0 0 0 0 0 0 Future years Future years Future years On Hold On Hold
BRODICK CEMETERY 12,000 7,021 12,000 0 7,021 0 7,021 7,021 9,521 2,500 2,500 Future years Future years Planning On Hold On Hold
KILBIRNIE CEMETERY WALL 188,370 2,043 188,370 0 90,000 0 2,043 2,043 2,043 (87,957) (87,957) 31-Mar-23 30-Apr-23 Feasibility Works On Target On Target
BEITH CEMETERY-WALL REPAIRS 87,542 3,122 87,542 0 40,000 0 2,533 2,533 2,533 (37,467) (37,467) 31-Mar-23 30-Apr-23 Feasibility Works On Target On Target
ABBEY TOWER CEMETERY WALL 95,550 2,314 95,550 0 3,520 0 2,314 2,314 3,520 0 0 31-Mar-24 31-Mar-24 Feasibility Works On Target On Target
HAWKHILL CEMETERY-WALL REPAIRS 108,732 1,811 108,732 0 1,811 0 1,811 1,811 1,811 0 0 31-Mar-24 31-Mar-24 Feasibility Works On Target On Target
WEST KILBRIDE CEMETERY WALL 99,528 771 99,528 0 2,413 0 771 771 2,413 0 0 31-Mar-24 31-Mar-24 Feasibility Works On Hold On Hold
STREET FURNITURE IMPROVEMENT 0 48,941 0 0 0 0 48,941 48,941 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PARK ENABLING WORKS 0 71,394 0 0 0 0 71,394 71,394 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
RENEWAL OF PLAY PARKS 235,000 109,288 235,000 0 235,000 0 109,288 109,288 235,000 0 0 31-Mar-23 31-Mar-23 Construction On Target On Target
Total Streetscene 6,580,996 2,900,769 6,580,996 0 2,268,848 0 1,481,239 1,481,239 2,230,924 (37,924) 0 (37,924)
Transport
VEHICLES * 1,851,898 787,138 1,851,898 0 1,851,898 0 787,138 787,138 1,851,898 0 0 31-Mar-23 31-Mar-23 Ongoing On Target On Target
WORKPLACE CHARGERS 316,213 225,283 316,213 0 200,613 0 109,683 109,683 200,613 0 0 31-Mar-23 31-Mar-23 Ongoing On Target On Target
FLEET DECARBONISATION 2,500,000 23,860 2,500,000 0 750,000 0 23,860 23,860 637,000 (113,000) (113,000) 31-Mar-23 31-Mar-23 Ongoing On Target On Target
Total Transport 4,668,111 1,036,281 4,668,111 0 2,802,511 0 920,681 920,681 2,689,511 (113,000) 0 (113,000)
Waste Services
SHEWALTON LANDFILL 13,577,702 13,577,702 13,577,702 0 305,160 0 305,160 305,160 305,160 0 0 Complete Complete Complete Complete Complete
Total Waste Services 14,844,503 14,844,503 14,844,503 0 305,160 0 305,160 305,160 305,160 0 0 0
Renewable Energy
SOLAR PV RETROFIT EXTENSION 120,000 41,795 120,000 0 78,205 0 0 0 78,205 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
SOLAR PV INVESTMENT - NETHERMAINS 6,768,000 139,534 6,768,000 0 500,000 0 96,094 96,094 500,000 0 0 30-Apr-24 30-Apr-24 Work Ongoing On Target On Target
SOLAR PV INVESTMENT - SHEWALTON 0 640 0 0 0 0 640 640 0 0 0 30-Oct-24 30-Oct-24 Work Ongoing On Target On Target
NON DOMESTIC ENERGY EFFICIENCY PROGRAMME 1,000,000 890,890 1,000,000 0 63,589 0 (45,521) (45,521) 63,589 0 0 31-Mar-23 31-Mar-23 Work Ongoing On Target On Target
NATURE RESTORATION FUND 356,000 0 356,000 0 356,000 0 0 0 0 (356,000) (356,000) 31-Mar-23 31-Mar-23 Planning On Target On Target
ELECTRIC VEHICLES INFRASTRUCTURE 646,392 653,841 646,392 0 69,574 0 77,023 77,023 69,574 0 0 31-Mar-23 31-Mar-23 Various On Target On Target
Total Renewable Energy 8,890,393 1,726,700 8,890,393 0 1,067,368 0 128,236 128,236 711,368 (356,000) 0 (356,000)
CAPITAL MONITORING 2022/23
Project Description
TOTAL PROJECT 2022/23 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
99

Page 100

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Year to Date
Budget 2022/23
Actual
Expenditure to 31
January 2023
Year to Date
Variance 2022/23
Projected
Expenditure to 31
March 2023    
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend         
Brought / Carry
Forward to
2023/4
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
CAPITAL MONITORING 2022/23
Project Description
TOTAL PROJECT 2022/23 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Office Accommodation
PROPERTY LIFECYCLE INVESTMENT * 33,105 0 33,105 0 33,105 0 0 0 33,105 0 0 0 31-Mar-23 31-Mar-23 Mulitple projects On Target On Target
PLI CALEY COURT RESOURCE CTR 3,000 0 3,000 0 3,000 0 0 0 3,000 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI CENTRAL AVE STREETSCENE DEPOT* 64,344 64,344 64,344 0 64,344 0 64,344 64,344 64,344 0 0 0 Complete Complete Complete Complete Complete
PLI BEITH CEMETERY 429 429 429 0 429 0 429 429 429 0 0 Complete Complete Complete Complete Complete
PLI WHITLEES COMMUNITY CTR 3,600 0 3,600 0 3,600 0 0 0 3,600 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI WEST KILBRIDE COMMUNITY CENTRE 135,499 98,575 135,499 0 135,499 0 98,575 98,575 135,499 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI WOODWYND HALL 2,000 0 2,000 0 2,000 0 0 0 0 (2,000) 0 (2,000) 21-Oct-22 31-May-23 Planning On Target On Target
PLI PORTLAND PLACE 27,967 0 27,967 0 27,967 0 0 0 18,000 (9,967) 0 (9,967) 31-Dec-22 30-Jun-23 Planning On Target On Target
PLI PADDOCKHOLM DEPOT 10,000 0 10,000 0 10,000 0 0 0 10,000 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI WEST BYREHILL DEPOT 160,513 28,385 160,513 0 160,513 0 28,385 28,385 160,513 0 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI GOLDCRAIGS DEPOT 134,000 15,405 134,000 0 14,024 0 15,405 15,405 15,405 1,381 1,381 31-Mar-23 31-Mar-24 Planning On Target On Target
PLI ANNICK PRIMARY SCHOOL 5,825 5,825 5,825 0 5,825 0 5,825 5,825 5,825 0 0 Complete Complete Complete Complete Complete
PLI ARDEER PRIMARY SCHOOL 2,952 2,952 2,952 0 2,952 0 2,952 2,952 2,952 0 0 0 Complete Complete Complete Complete Complete
PLI BLACKLANDS PRIMARY SCHOOL 210,000 191,777 210,000 0 210,000 0 191,777 191,777 210,000 0 0 Complete Complete Complete Complete Complete
PLI CALEDONIA PRIMARY SCHOOL 11,968 6,646 11,968 0 11,968 0 6,646 6,646 11,968 0 0 Complete Complete Complete Complete Complete
PLI DALRY PRIMARY SCHOOL 89,000 6,704 89,000 0 19,907 0 6,704 6,704 19,907 0 0 18-Aug-23 18-Aug-23 Planning On Target On Target
PLI FAIRLIE PRIMARY SCHOOL 7,374 0 7,374 0 7,374 0 0 0 7,374 0 0 Complete Complete Complete Complete Complete
PLI GLENCAIRN PRIMARY SCHOOL 175,759 155,088 175,759 0 175,759 0 155,088 155,088 175,759 0 0 Complete Complete Complete Complete Complete
PLI PENNYBURN PRIMARY 415,450 0 415,450 0 35,000 0 0 0 3,500 (31,500) (31,500) 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI ST BRIDGETS PRIMARY 5,500 0 5,500 0 5,500 0 0 0 5,500 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI SHISKINE PRIMARY 3,927 28 3,927 0 3,927 0 28 28 3,927 0 0 Complete Complete Complete Complete Complete
PLI ST JOHN OGILVIE PRIMARY SCHOOL 13,323 13,323 13,323 0 13,323 0 13,323 13,323 13,323 0 0 Complete Complete Complete Complete Complete
PLI ST PETER'S PRIMARY 1,971 1,971 1,971 0 1,971 0 1,971 1,971 1,971 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE PRIMARY* 325 325 325 0 325 0 325 325 325 0 0 0 Complete Complete Complete Complete Complete
PLI WOODLANDS PRIMARY 5,553 5,553 5,553 0 5,553 0 5,553 5,553 5,553 0 0 Complete Complete Complete Complete Complete
PLI AUCHENHARVIE ACADEMY* 821,820 100,109 821,820 0 471,820 0 100,109 100,109 550,000 78,180 78,180 31-Mar-23 30-Jun-23 Construction On Target On Target
PLI IRVINE ROYAL ACADEMY* 378,785 10,171 378,785 0 10,171 0 10,171 10,171 10,171 0 0 31-Aug-23 31-Aug-23 Pupil Toilets: Complete AW Pitches: TenderOn Target Significantly off Resource pressures within PMI resulting in this project being
PLI KILWINNING ACADEMY 270,000 17,677 270,000 0 220,000 0 17,677 17,677 87,677 (132,323) (132,323) 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI 6A KILWINNING ROAD 7,619 7,619 7,619 0 7,619 0 7,619 7,619 7,619 0 0 Complete Complete Complete Complete Complete
PLI LARGS LIBRARY 5,000 0 5,000 0 5,000 0 0 0 5,000 0 0 Complete Complete Complete Complete Complete
PLI CUNNINGHAME HOUSE 98,273 3,482 98,273 0 98,273 0 3,482 3,482 3,482 (94,791) (94,791) 31-Mar-23 31-Aug-23 On Hold On Target Slightly off target  Works on hold depending on Land and Property review
PLI H&SCP 47 WEST ROAD 10,000 9,555 10,000 0 10,000 0 9,555 9,555 10,000 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI GALT HOUSE 12,486 0 12,486 0 12,486 0 0 0 12,486 0 0 Complete Complete Complete Complete Complete
PLI ACHNAMARA CHILDREN'S UNIT 25,000 0 25,000 0 25,000 0 0 0 25,000 0 0 Complete Complete Complete Complete Complete
PLI THE MEADOWS 5,900 0 5,900 0 5,900 0 0 0 5,900 0 0 Complete Complete Complete Complete Complete
PLI ANAM CARA 80,000 0 80,000 0 80,000 0 0 0 50,000 (30,000) (30,000) 30-Apr-23 31-May-23 Planning On Target On Target
PLI GARNOCK CAMPUS 11,443 0 11,443 0 11,443 0 0 0 11,443 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
PLI THE PORTAL 6,611 0 6,611 0 6,611 0 0 0 6,611 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
Total Office Accommodation 3,331,321 745,943 3,331,321 0 1,918,188 0 745,943 745,943 1,697,168 (221,020) 0 (221,020)
Other Property
INDUSTRIAL PORTFOLIO * 430,713 0 430,713 0 430,713 0 0 0 430,713 0 0 On Hold On Hold Multiple projects On Target On Target
HOME 4,470,199 288,648 4,470,199 0 100,000 0 50,533 50,533 100,000 0 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
BUILD 284,086 46,249 284,086 0 247,284 0 9,448 9,448 247,284 0 0 0 31-Mar-23 31-Mar-23 In development On Target On Target
EMERGENCY CONTROL CTR 158,000 1,220 158,000 0 158,000 0 1,220 1,220 158,000 0 0 0 31-Mar-23 31-Mar-23 In development On Target On Target
GOLDCRAIGS REFURBISHMENT 509,000 0 509,000 0 25,000 0 0 0 25,000 0 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
WOODLANDS PRIMARY PLAYINGFIELD DRAINAGE 134,640 104,190 134,640 0 26,928 0 (3,523) (3,523) 1,246 (25,682) (25,682) Complete Complete Complete On Target On Target
Total Property 5,986,638 440,307 5,986,638 0 987,925 0 57,677 57,677 962,243 (25,682) 0 (25,682)
Other Housing
CCTV REVIEW 350,000 0 350,000 0 350,000 0 0 0 350,000 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
Total Other Housing 350,000 0 350,000 0 350,000 0 0 0 350,000 0 0 0
100

Page 101

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2022/23
Year to Date
Budget 2022/23
Actual
Expenditure to 31
January 2023
Year to Date
Variance 2022/23
Projected
Expenditure to 31
March 2023    
Actual Over/
(Under) Spend for
2022/23
True Over/
(Under) Spend         
Brought / Carry
Forward to
2023/4
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
CAPITAL MONITORING 2022/23
Project Description
TOTAL PROJECT 2022/23 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Regeneration
TOWN CENTRE REGENERATION 1,290,257 1,055,769 1,290,257 0 416,774 0 182,287 182,287 276,774 (140,000) (140,000) 30-Sep-22 30-Sep-23 Construction On Target On Target
REPURPOSING PROPERTY GRANT FUND 330,000 30,177 330,000 0 329,320 0 29,497 29,497 90,000 (239,320) (239,320) 30-May-25 30-May-25 In development On Target On Target
STEVENSTON BEACH HUB 180,000 180,000 180,000 0 84,525 0 84,525 84,525 84,525 0 0 Complete Complete Complete Complete Complete
MILLPORT TOWN HALL REGENERATION 2,103,330 1,757,966 2,103,330 0 1,569,838 0 1,224,474 1,224,474 1,317,309 (252,529) (252,529) 31-Dec-22 31-May-23 Construction On Target Slightly off target  Contractor is delayed, revised completion May 2023
MILLPORT TOWN HALL PHASE 2 509,450 77,634 509,450 0 509,450 0 77,634 77,634 349,952 (159,498) (159,498) 31-Mar-23 31-May-23 Construction On Target Slightly off target  Contractor is delayed, revised completion May 2023
ISLANDS PIT STOPS 540,000 0 540,000 0 540,000 0 0 0 20,000 (520,000) (520,000) 31-Mar-24 31-Mar-24 In development On Target On Target
ISLAND INFRASTRUCTURE FUND 259,000 137,112 259,000 0 259,000 0 137,112 137,112 259,000 0 0 31-Mar-23 31-Mar-23 In development On Target On Target
ISLANDS COST CRISIS FUND 17,000 0 17,000 0 17,000 0 0 0 17,000 0 0 31-Mar-23 31-Mar-23 In development On Target On Target
PLACE BASED INVESTMENT PROGRAMME (PBIP) 1,343,000 421,478 1,343,000 0 1,312,223 0 390,701 390,701 1,075,000 (237,223) (237,223) 31-Mar-26 31-Mar-26 In development On Target On Target
UK SHARED PROSPERITY FUND (SPF) 98,414 0 98,414 0 98,414 0 0 0 0 (98,414) (98,414) 31-Mar-25 31-Mar-25 In development On Target On Target
PBIP 36 BANK STREET 770,000 72,103 770,000 0 741,400 0 43,504 43,504 100,000 (641,400) (641,400) 31-Dec-24 31-Dec-25 In development On Target On Target
IRVINE HIGH STREET 2,837,316 2,706,355 2,837,316 0 165,818 0 34,857 34,857 54,327 (111,491) (111,491) Complete Complete Complete Complete Complete
MILLPORT CARS 255,611 231,239 255,611 0 255,611 0 231,239 231,239 255,611 0 0 31-Mar-23 31-Mar-23 Construction On Target On Target
MONTGOMERIE PARK MASTERPLAN 3,718,598 1,761,020 3,718,598 0 136,264 0 18,686 18,686 36,264 (100,000) (100,000) 31-Mar-30 31-Mar-30 In development On Target On Target
LOCHSHORE, KILBIRNIE 2,010,638 1,323,779 2,010,638 0 1,441,786 0 754,927 754,927 1,441,786 0 0 31-May-25 31-May-25 In development On Target On Target
LOCHSHORE GARNOCK HUB 4,195,999 3,984,927 4,195,999 0 1,377,575 0 1,166,503 1,166,503 1,377,575 0 0 Complete Complete Complete On Target On Target
VDLF - IRVINE KYLE ROAD SITE PREP* 1,421,110 1,421,110 1,421,110 0 180 0 180 180 180 0 0 Complete Complete Complete Complete Complete
VDLF - KYLE ROAD PHASE 2 267,066 165,790 267,066 0 245,893 0 144,617 144,617 175,000 (70,893) (70,893) 31-Mar-24 31-Mar-24 In development On Target On Target
VDLF - ANNICKBANK PH 3* 1,481,000 116,261 1,481,000 0 475,000 0 59,220 59,220 475,000 0 0 31-Mar-24 31-Mar-24 Tender On Target On Target
VDLF - DEVELOPMENT WORK* 347,479 86,437 347,479 0 152,479 0 37,175 37,175 75,000 (77,479) (77,479) 30-Sep-23 31-Mar-24 In development On Target On Target
VDLF - STRATEGY 50,000 21,445 50,000 0 50,000 0 21,445 21,445 40,000 (10,000) (10,000) 31-Mar-23 30-Sep-23 In development On Target On Target
VDLF - TREE PLANTING 50,000 2,400 50,000 0 7,600 0 0 0 7,600 0 0 31-Dec-23 31-Dec-23 In development On Target On Target
QUARRY ROAD PHASE 2 5,209,497 5,204,719 5,209,497 0 25,301 0 20,523 20,523 25,301 0 0 Complete Complete Complete Complete Complete
VDLF - GAS WORKS (DALRY)* 173,896 166,061 173,896 0 0 0 (7,835) (7,835) 0 0 0 Complete Complete Complete Complete Complete
CYCLING/WALKING/SAFER STREETS * 559,956 583,433 559,956 0 559,956 0 499,637 499,637 559,956 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
ACCESS PATH NETWORK PROGRAMME * 199,257 51,000 199,257 0 199,257 0 (8,878) (8,878) 51,000 (148,257) (148,257) 31-Mar-24 31-Mar-24 Various On Target On Target
FAIRLIE COASTAL PATH 50,000 50,000 50,000 0 50,000 0 12,089 12,089 50,000 0 0 31-Dec-23 31-Dec-23 In development On Target On Target
PENNYBURN ROUNDABOUT BUS LANE 15,420 123,668 15,420 0 15,420 0 0 0 15,420 0 0 31-Mar-23 31-Mar-23 Feasibility On Target On Target
IRVINE CYCLE FRIENDLY TOWN 250,000 251,050 250,000 0 250,000 0 1,050 1,050 250,000 0 0 31-Mar-23 31-Mar-23 Various On Target On Target
BRODICK TO CORRIE CYCLE PATH 50,000 35,212 50,000 0 50,000 0 0 0 50,000 0 0 31-Mar-23 31-Mar-23 Design On Target On Target
BUS CORRIDOR IMPROVEMENTS 204,955 74,955 204,955 0 130,000 0 0 0 130,000 0 0 31-Mar-23 31-Mar-23 Various On Target On Target
BUS ROUTE CONGESTION MEASURES 757,821 606,570 757,821 0 152,571 0 1,320 1,320 152,571 0 0 31-Mar-23 31-Mar-23 Construction On Target On Target
CUMBRAE FERRY & BUS STOP 223,690 53,405 223,690 0 200,000 0 29,715 29,715 200,000 0 0 31-Mar-23 31-Mar-23 Design On Target On Target
B714 ACTIVE TRAVEL IMPROVEMENTS 100,000 29,435 100,000 0 100,000 0 29,435 29,435 100,000 0 0 31-Mar-23 31-Mar-23 Design On Target On Target
B777 CORRIDOR IMPROVEMENTS 38,400 0 38,400 0 4,800 0 0 0 4,800 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
STTS U88 NORTH SANNOX 181,580 115,555 181,580 0 181,580 0 115,555 115,555 181,580 0 31-Mar-23 31-Mar-23 Planning On Target On Target
STTS ROSS ROAD ARRAN 221,340 281,245 221,340 0 221,340 0 221,340 221,340 221,340 0 0 31-Mar-23 31-Mar-23 Planning On Target On Target
Total Regeneration 32,476,983 23,245,215 32,476,983 0 12,326,375 0 5,552,534 5,552,534 9,519,871 (2,806,504) 0 (2,806,504)
Ayrshire Growth Deal
AYRSHIRE GROWTH DEAL 0 286,806 0 0 0 0 286,806 286,806 0 0 0 31-Mar-26 31-Mar-26 On Target On Target
AGD - I3 DPMC PHASE 1 1,000,000 5,449 1,000,000 0 500,000 0 0 0 200,000 (300,000) (300,000) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 DPMC PHASE 2 5,000,000 179,970 5,000,000 0 100,000 0 0 0 70,000 (30,000) (30,000) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE 15,000,000 247,568 15,000,000 0 208,000 0 8,886 8,886 208,000 0 0 31-Mar-26 31-Mar-27 Multiple Projects On Target On Target
AGD - HUNTERSTON - CENTRE OF LOW CARBON ENERGY & CIRCULAR 18,040,001 198,695 18,040,001 0 200,000 0 12,575 12,575 200,000 0 0 31-Mar-26 31-Mar-26 Multiple Projects On Target On Target
AGD - GREAT HARBOUR 14,017,799 411,016 14,017,799 0 400,000 0 114,698 114,698 400,000 0 0 31-Mar-26 31-Mar-26 Multiple Projects On Target On Target
AGD - IMSE 10,500,000 102,260 10,500,000 0 174,000 0 0 0 174,000 0 0 31-Mar-27 31-Mar-27 Design On Target On Target
AGD - MARINE TOURISM ARDROSSAN 11,428,354 292,225 11,428,354 0 137,638 0 81,484 81,484 137,638 0 0 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - MARINE TOURISM ARRAN 58,887 30,122 58,887 0 30,176 0 1,411 1,411 30,176 0 0 31-Mar-29 31-Mar-29 Design On Target On Target
AGD - MARINE TOURISM CUMBRAE 66,747 35,972 66,747 0 32,186 0 1,411 1,411 32,186 0 0 31-Mar-29 31-Mar-29 Design On Target On Target
Total Ayrshire Growth Deal 75,111,787 1,790,082 75,111,787 0 1,782,000 0 507,270 507,270 1,452,000 (330,000) 0 (330,000)
Growth & Investment
ARDROSSAN HARBOUR INTERCHANGE 4,077,112 389,956 4,077,112 0 50,000 0 247 247 50,000 0 0 31-Dec-24 31-Dec-24 Design Slightly off target  On Target Increased tender cost risks identified
LOW CARBON HUB 1,430,017 112,005 1,430,017 0 123,698 0 25,204 25,204 123,698 0 0 30-Apr-24 30-Apr-24 Multiple Projects On Target On Target
ARDROSSAN NORTH SHORE 27,285,478 2,592,962 27,285,478 0 501,647 0 295,438 295,438 541,317 39,670 39,670 30-Apr-24 30-Apr-24 In development Slightly off target  Slightly off target  Projected spend increased to include additional site investigations
VDLF - HARBOUR MASTERS OFFICE 157,500 20,722 157,500 0 0 0 0 0 0 0 0 31-Mar-23 31-Mar-23 Design On Target On Target
VDLF - I3 IRVINE ENTERPRISE 996,981 161,160 996,981 0 129,627 0 8,332 8,332 129,627 0 0 31-Mar-23 31-Mar-23 Design On Target On Target
Other Growth & Investment 44,693,159 3,276,804 44,693,159 0 804,972 0 329,221 329,221 844,642 39,670 0 39,670
Total Economic Development & Regeneration 152,281,929 28,312,101 152,281,929 0 14,913,347 0 6,389,025 6,389,025 11,816,513 (3,096,834) 0 (3,096,834)
Completed Projects
BIOMASS RETROFIT PROGRAMME 3,378,163 3,377,162 3,378,163 0 0 0 (1,002) (1,002) 0 0 0 Complete Complete Complete Complete Complete
QUARRY ROAD PHASE 1 2,977,098 2,898,460 2,977,098 0 40,595 0 (38,043) (38,043) 0 (40,595) (40,595) Complete Complete Defects Period Complete Complete
ARDROSSAN HOSTEL 0 0 10,203 10,203 0 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 6,390,674 6,311,034 6,390,674 0 40,595 0 (28,842) (28,842) 0 (40,595) 0 (40,595)
Total Place 310,958,614 82,921,978 310,953,081 (5,533) 41,297,742 0 19,279,774 19,279,774 34,670,473 (6,627,269) (5,533) (6,621,736)
101

Page 102

OTHER BUDGETS
AE
Total Project Budget                    Cumulative Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised
Budget 2022/23
Year to Date Budget
2022/23
Actual Expenditure
to 31 January 2023
Year to Date
Variance 2022/23
Projected
Expenditure to 31
March 2023
Over/ (Under)
Spend for 22/23
£ £ £ £ £ £ £ £ £ £
FLEXIBILITY / IMPROVEMENT FUND 9,474,863 0 7,562,125 (1,912,738) 1,912,738 0 0 0 0 (1,912,738)
CORE INFRASTRUCTURE INVESTMENT 608,000 0 0 (608,000) 608,000 0 0 0 0 (608,000)
Total Other Budgets 9,474,863 0 7,562,125 (1,912,738) 2,520,738 0 0 0 0 (2,520,738)
2022/23 BUDGETS
CommentsProject Description
TOTAL PROJECT
102

Page 103

Appendix 2
HRA Capital Statement APPENDIX 2
For the Ten months to 31 January
2023
Description
Approved
budget 16
February
2022
Current
budget
including
carry forwards
Approved
Revisions to
programme
Carry forward
(to)/from
future years
Revised Budget
2022/23
Actual Spend to
31/12/2022 P10 Projection True Over /
(Under)spend
Delivery Status
Financial
Delivery Status
Physical Comments
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House Build Programme
Council House Building General 1,542 1,542 - (1,542) - (6) - - On Target On Target
Acquisition Of Houses On Open Market 720 526 210 - 736 367 736 - On Target On Target
New Build Corsehillhead 1,450 600 - - 600 34 600 - On Target Slightly off target  Expected completion Autumn/Winter 2023.
New Build Brathwic Terrace 18 168 - 109 277 54 277 - On Target Complete Completed - final properties were handed over in June 2022
New Build Flatt Road Phase 1 1,712 1,072 (648) 357 781 102 781 - Slightly off target  Complete Completed - final properties were handed over in December 2021.  Remaining budget to be transferred to projects in Lots
E and F for 2023/24.
New Build Towerlands 25 160 20 - 180 18 180 - On Target Complete Completed - final properties were handed over in March 2022.
New Build Kinnier Road 3 2 (2) - - - - - Complete Complete Completed - properties were handed over in October 2021.
New Build St Colms 1,896 782 302 65 1,149 1,088 1,149 - Complete Complete
New Build St Michaels Wynd - 592 210 193 995 903 995 - On Target Complete Completed - final properties handed over in August 2002.
New Build Harbourside Irvine 6,460 6,000 (237) - 5,763 3,474 5,763 - On Target Slightly off target  Expected completion March 2023.
New Build Afton Court 910 1,080 24 115 1,219 24 1,219 - On Target Slightly off target  Expected completion Summer 2023.
New Build Caley Court 1,769 1,843 (35) 35 1,843 1,496 1,843 - On Target Slightly off target  Completed January 2023.
New Build Springvale Saltcoats - 133 7 1 141 8 141 - On Target Complete Completed - properties were handed over in November 2021.
New Build Dalrymple Place - 101 - - 101 3 101 - On Target Complete Completed - properties were handed over in October 2021.
New Build St Beya Millport 6 53 - - 53 51 53 - On Target Complete Completed - properties were handed over in July 2021.
Garnock Academy Site 7,950 1,800 - (1,700) 100 - 100 - Slightly off target  Slightly off target  Tender stage. Expected completion Spring 2025. 
Largs police Station 1,908 1,600 105 - 1,705 360 1,705 - On Target Slightly off target  Demolition complete. Expected completion Summer 2023.
Ayrshire Central Site 9,497 1,500 - (1,400) 100 13 100 - On Target Slightly off target  Pre-planning stage. Expected completion Spring 2026.
Bourtreehill Village 2,000 25 - - 25 17 25 - On Target Slightly off target  Pre-planning stage. New completion date to be established. 
James McFarlane ASN Site 3,050 2,250 - (2,150) 100 48 100 - On Target Slightly off target  Consultation stage. Expected completion Summer 2024.
James Reid ASN school 6,050 1,125 - (1,005) 120 103 120 - On Target Slightly off target  Consultation stage. Expected completion Winter 2024.
Stanecastle ASN School 3,300 1,850 - (1,750) 100 76 100 - On Target Slightly off target  Consultation stage. Expected completion Summer 2024.
Fullarton Street 4,090 25 - - 25 10 25 - On Target Slightly off target  Delays to delivery due to rehousing of tenants, which has now been completed. Demolition contractor appointed and
onsite, demolition expected to complete in Summer 2023. Expected completion 2025.
New Build Montgomerie Park 10,900 1,500 - (1,450) 50 6 50 - On Target Slightly off target  Pre-planning stage. Expected completion Winter 2026.
Glebe Place 10 50 (50) 25 25 - 25 - On Target On Target New build project deferred until 2025/26
Regeneration Project 1e 15 5 - - 5 - 5 - On Target On Target Pre-planning stage.
Unallocated Regeneration Block 1 55 - - - - - - - On Target On Target Pre-planning stage.
Laburnum Avenue (Regen 1a) 160 5 5 - 10 - 10 - On Target On Target Pre-planning stage.
103

Page 104

Appendix 2
Description
Approved
budget 16
February
2022
Current
budget
including
carry forwards
Approved
Revisions to
programme
Carry forward
(to)/from
future years
Revised Budget
2022/23
Actual Spend to
31/12/2022 P10 Projection True Over /
(Under)spend
Delivery Status
Financial
Delivery Status
Physical Comments
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Newhouse Drive (Regen 1b) 175 5 - (5) - - - - On Target On Target Pre-planning stage.
Regeneration Project 1d 360 5 - - 5 3 5 - On Target On Target Pre-planning stage.
Contingency 1,163 8,820 (8,820) - - - - -
CONNEL COURT (49) 49 1 1 (30) 1 - Complete Complete
GARRIER COURT (56) 25 32 1 (33) 1 - Complete Complete
Total For Council House Build Programme 67,194 35,114 (8,835) (10,069) 16,210 8,189 16,210 -
Improvement to Existing Homes - Building
Services
Window Replacement 325 364 11 (215) 160 8 160 - On Target On Target
Bathroom Programme 75 75 183 18 276 571 276 - On Target On Target
Kitchen Programme 2,610 4,450 - (159) 4,291 496 1,294 (2,997) On Target Slightly off target  324 units will now not be programmed due to labour shortage. Additional underspend showing due to previous years
underspend not required.  Previous years uncompleted units were included in the revised business plan last year,
therefore already accounted for.
Bathroom Programme Voids - - 1,024 (33) 991 - 991 - On Target On Target
Kitchen Programme Voids - - 1,297 (152) 1,145 - 1,145 - On Target On Target
Door replacement programme 2,191 2,191 (2,191) - - - - - Significantly off
target
Significantly off
target
Door replacement programme - tender has been re-issued following specification review due to unviable costs.  Balance
of budget requires to be earmarked for 2023/24.
Sheltered Housing Units 8,531 8,495 (8,245) - 250 114 250 - Significantly off
target
Significantly off
target
Projection reduced due to Procurement Issues and external contractor issues - remaining budget to be carried forward to
23/24.  Spend this financial year will only be consultants and staff costs. Construction estimated to commence late 22/23.
Tender for Barnett returned and checking quality.
Saltcoats MSF Investment 4,767 1,881 (663) (35) 1,183 611 1,183 - On Target Slightly off target  Additional works required.  Expected completion Winter 2022.
Total For Improvements to Existing Homes -
Building Services
18,499 17,456 (8,584) (576) 8,296 1,800 5,299 (2,997)
Improvement to Existing Homes - External
Contractors
Central Heating 2,524 4,442 (1,756) - 2,686 1,026 1,738 (948) On Target On Target Underspend showing due to previous years underspend not required.  Previous years uncompleted units were included in
the revised business plan last year, therefore already accounted for.
Insulated Re-Rendering 421 865 1,756 - 2,621 - 1,811 (1,480) On Target On Target Budget vired from roofing & rerendering offset additional spend in insulated rerendering. Following contractor surverys
some wall/floor render has been reprofiled as EWI and virement approved.
Electrical Rewiring 698 1,742 - - 1,742 101 210 (1,532) On Target On Target Underspend showing due to previous years underspend not required.  Previous years uncompleted units were included in
the revised business plan last year, therefore already accounted for. Also issues with contractor labour shortages and no
access.
0
Total For Improvements to Existing Homes -
External Contractors
3,643 7,049 - - 7,049 1,127 3,759 (3,960)
Refurbishment Schemes
Roofing & Rendering 4,450 5,507 - - 5,507 2,102 2,689 (2,145) Slightly off target  On Target Uncompleted units from previous years accounted for in future years. Previous years carry forward not required.
Following contractor surverys some wall/floor render has been reprofiled as EWI and virement approved.
Demolition High Flats Irvine 6,780 3,000 (1,302) (731) 967 145 967 - Slightly off target  Slightly off target  Tender received lower than budget estimate. Demolition contractor appointed and onsite, demolition expected to
complete in Summer/Autumn 2023.  Balance of budget requires to be earmarked for 2023/24.
Kings Arms Project 265 600 (440) (1) 159 110 159 - On Target Slightly off target  Consultation stage, construction is due to commence Winter 2022
Refurb Maress House - (12) 13 - 1 - 1 - On Target On Target HRA contribution to the project complete.
Refurb Friars Lawn - 254 (34) 34 254 23 254 - On Target Complete Final completion expected August 2022.
Total For Refurbishment Schemes 11,495 9,349 (1,763) (698) 6,888 2,380 4,073 (2,145)
-
104

Page 105

Appendix 2
Description
Approved
budget 16
February
2022
Current
budget
including
carry forwards
Approved
Revisions to
programme
Carry forward
(to)/from
future years
Revised Budget
2022/23
Actual Spend to
31/12/2022 P10 Projection True Over /
(Under)spend
Delivery Status
Financial
Delivery Status
Physical Comments
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Other Capital Works
Energy Efficiency Standard 5,362 5,488 (5,309) (180) (1) 180 (1) - On Target On Target
Other Capital Works 726 712 - (711) 1 - 1 - On Target On Target
Major Improvements 6 6 - (6) - - - - On Target On Target
Parkhall & Kirkhall Asbestos - 17 - - 17 - 17 - On Target On Target
Detection Equipment 458 1,463 (1,263) (50) 150 103 150 - Slightly off target  Slightly off target  Contractor continuing to work through addresses, forced entries process in place / limited capacity due to staff issues
(contractors) will span 2 years.  Balance of budget to be earmarked for 2023/24.
Solar Panels 3,862 3,888 7 (1,820) 2,075 512 2,075 - On Target On Target
Professional Management Charges 1,326 1,738 - - 1,738 523 1,738 - On Target On Target
Estate Based Regeneration 1,287 2,190 (1,187) - 1,003 282 1,003 - Slightly off target  Slightly off target  Programme currently being revised. Proposals to Cabinet in Autumn/Winter 2022. Balance of budget to be earmarked for
2023/24.
Nelson Street Regeneration 442 451 (426) - 25 - 25 - Significantly off
target
Significantly off
target
Final property obtained through CPO. Feasibility exercise being undertaken.  Balance of budget to be earmarked for
2023/24.
Health and Safety Works 207 207 - (207) - - - - On Target On Target
Total For Other Capital Works 13,676 16,160 (8,178) (2,974) 5,008 1,600 5,008 -
TOTAL EXPENDITURE 114,507 85,128 (27,360) (14,317) 43,451 15,096 34,349 (9,102)
CFCR (12,209) (12,209) - - (12,209) (1) (12,209)
Capital Grants (14,175) (7,138) 5,371 - (1,767) (87) (1,767) - Slippage in house building resulting in reduction in grant claims.
Affordable Housing Contribution (1,596) (1,596) - (1,596) - (1,596)
Prudential Borrowing (85,376) (63,034) 21,989 14,317 (26,728) - (18,000) 9,102
Council House Build Fund (1,151) (1,151) - (1,151) - (777)
TOTAL INCOME (114,507) (85,128) 27,360 14,317 (43,451) (88) (34,349) 9,102
NET EXPENDITURE - - - - - 15,008 - -
The following classifications have been used to highlight financial performance against budget
On Target On Target (+0.5% of budget) On Target (up to  5% delay of original timescales)
Slightly off target  Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less) Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target Significantly off target (+2% or more of budget, or £0.500m, whichever is less) Significantly off target (+10% or more of original timescales)
105

Page 106

106

Page 107

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Strategic Risk Register 2023/24 
Purpose:  To seek Cabinet approval of the Strategic Risk Register for
2023/24. 
Recommendation:  That Cabinet approves the Council’s Strategic Risk Register for
2023/24. 
1. Executive Summary 
1.1 The Strategic Risk Register has been reviewed and updated for 2023/24. 
1.2 It is recommended that 7 of the 8 previous risks remain on the Strategic Risk Register
at their existing risk scores and titles – Financial Environment, Inequalities, Cyber
Security, Transformation, Climate Change, Financial Sustainability of the Health and
Social Care Partnership, and Community Capacity Building & Empowerment. 
1.3 A previous risk relating to the Operating Environment of the Council post-COVID has
been removed from the register. This risk had previously been included to take
account of the challenges of recovery and the uncertain operating environment. These
risks are captured fully within other specific risks within the register which will lead to
improved management of those risk mitigation actions. 
1.4 A new strategic risk has been added relating to the implementation of the National
Care Service, and the potential impact on the Council’s resources. 
2. Background 
2.1 North Ayrshire Council is committed to ensuring that it is proactive in identifying and
managing the risks impacting on the authority. The Council recognises that a certain
amount of risk is inevitable if the organisation is to achieve its objectives. 
2.2 The aim of risk management is to reduce the likelihood and/or impact of risk by
identifying and controlling risks to the Council.  If risk is to be managed appropriately,
and Services are aware of these risks, risk management can contribute positively
towards the organisation's decision-making processes, making the Council more
innovative and effective in its approach to service delivery. 
Agenda Item 8
107

Page 108

2.3 The most significant risks are identified through the Council's Strategic Risk Register,
recognising the challenges facing the Council and demonstrating the arrangements in
place to manage these risks. 
2.4 The Strategic Risk Register has been reviewed and updated for 2023/24 and is
attached at Appendix 1 to this report.  For each of the risks detailed within the register
a number of components are identified: 
• Risk proximity factors.
• Risk score.
• Potential effect on the Council's priorities.
• Internal controls currently in place.
• Assessment of controls, and
• Additional actions identified. 
2.5 To assist in the assessment of each risk, the Council’s agreed risk matrix was used to
ensure consistency. This is used to assess the likelihood of occurrence (on a scale
from 1 to 5) and the significance of the impact of the risk should it occur (on a scale
from 1 to 5). The risk score is the product of likelihood multiplied by impact. Only those
risks rated as high or very high (10 or above) will feature on the SRR to ensure a
focus on managing the most significant risks. 
2.6 Seven risks remain on the Strategic Risk Register at their existing risk scores –
Financial Environment, Inequalities, Cyber Security, Financial Sustainability of the
Health and Social Care Partnership, Transformation, Climate Change and Community
Capacity Building and Empowerment. 
2.7 An additional risk has been captured within the Strategic Risk Register around the
implementation of the National Care Service.  The risk reflects that this is one of the
most significant reorganisations for local government since 1996, and there is
uncertainty over the scope of the National Care Service which could result in tight
timescales and significant resource pressures for implementation. 
2.8 The risk included in the 2022/23 strategic risk register around the Operating
Environment as the Council recovered from COVID-19 has now been removed.  This
reflected a number of challenging emerging risks at the time including recovery, living
with COVID, inflationary impacts, cost of living, and supply chain/construction inflation. 
Risks which remain relevant for 2023/24 are still included within the register but
captured within the specific risks relevant to these challenges, primarily Financial
Environment. 
2.9 Very High Risks  
• Financial Environment – this risk reflects the ongoing financial challenge faced
by the Council (risk score 20).
• Inequalities – this highlights the socio-economic inequalities faced in North
Ayrshire (risk score 20).
• National Care Service – this risk reflects the challenges and uncertainty the
Council faces with a major reorganisation of one of its most significant and
important functions (risk score 20). 
108

Page 109

High Risks 
• Cyber Security – this reflects the ongoing risk from external cyber-attack which
is being faced by all organisations (risk score 16).
• Transformation – this reflects the wider risks associated with delivering the
current Transformation Programme and developing a pipeline of future initiatives
(risk score 16).
• Climate Change – this risk has been on the Strategic Risk Register following the
declaration by the Council of a Climate Change Emergency during 2019 (risk
score 16).
• Financial Sustainability of the Health and Social Care Partnership – this
reflects the ongoing financial challenges faced by the Partnership and the risk
these present to the Council (risk score 12).
• Community Capacity Building and Empowerment – this highlights the
challenges associated with community empowerment (risk score 12). 
2.10 Council services have identified high level strategic actions within their planning for
2023/24 to help the Council mitigate against its strategic risks. These actions are
detailed in summary format in the Risk Management Action Plans following each Risk
within Appendix 1.  These actions will assist with performance monitoring and
reporting on the strategic risks. 
2.11 The Council’s Internal Audit Plan 2023/24 is scheduled to be approved at the Audit
and Scrutiny Committee on 28 March 2023 and is risk-based with clear links in place
between the audit plan and key risks the Council faces. 
3. Proposals 
3.1 Cabinet is requested to approve the Strategic Risk Register 2023/24. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Council continues to have a robust long- and medium-term financial planning
framework. Key strands include development of key transformation themes and the
establishment of an Investment Fund that will generate future savings alongside
delivery of a number of key Council priorities. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
109

Page 110

Equality/Socio-economic 
4.4 The risk to the Council is that North Ayrshire residents, and in particular certain
groups, will experience increasing levels of poverty and its effects. Current control
measures fall into two categories - measures to address the root causes of socio-
economic inequalities - income through employment or benefits – and mitigation
measures to minimise the impacts of poverty. 
Climate Change and Carbon 
4.5 The Council has declared a climate change emergency and has in place an
Environmental Sustainability and Climate Change Strategy. Significant work to help
mitigate the risk of flooding is included within the Capital Plan. The Council is
undertaking an ambitious renewable energy programme. 
Key Priorities 
4.6 A successful risk management framework helps to underpin the delivery of the
Council’s strategic priorities in the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The Strategic Risk Register has been reviewed in consultation with the Executive
Leadership Team and the Corporate Risk Management Group. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294-324524. 
Background Papers
None.
110

Page 111

Appendix 1 - Strategic Risk Report 2023/24
Risk Code SRR2324_R01 Risk Title Financial Environment Latest Note Date 25-Jan-2023
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The risk is that the level of funding from Scottish
Government to local government will require the Council
to take increasingly difficult and challenging decisions,
potentially operating with increased levels of risk to
ensure service delivery and investment in assets align
with available resources. The 2023/24 local government
settlement represents an increase of 0.33% in core
grant funding, this has to continue to be looked at within
the context of financial pressures facing the council
including pay, significant inflationary, contractual and
demographic pressures over the short, medium and
long term.
Additional challenges are being faced where Scottish
Government is ringfencing increasing areas of the
budget settlement, and this is further exacerbated by the
inclusion of some elements of the 2023/24 budget being
conditional on certain criteria being met.
The Budget gap for 2023/24 sits at £10.3m. The gap for
24/25 is estimated at £17m. The continuation of single
year settlements makes effective medium and long term
financial planning challenging. It is recommended that
following the settlement and within the wider financial
pressure context, the risk score remains unchanged at
this time. Any consideration to change this will only
occur following a sustained period of annual growth in
core revenue funding, however, this will also have to be
considered within the context of inflation and the
resultant cost pressures.
The Council is exposed to financial risk as a result of
underlying cost pressures within the IJB; more detail on
this is set out at risk SRR03.  
Funding not keeping pace with
demand and inflationary cost
pressures means that there will
be a reduction in some service
areas potentially resulting in
higher risks for service users.
The future delivery of balanced
budgets will become
increasingly challenging.   
Robust monitoring of the Council’s revenue and capital budgets is in
place as well as regular reporting of financial performance of the IJB
to Cabinet and Audit and Scrutiny. 
To assist financial planning The Long Term Financial Outlook (LTFO)
to 2030/31 was approved at Council on 16 December 2020 - this is
the cornerstone of the Council's financial planning in the medium to
long term. 
The Council approved a balanced budget for 2022/23 on 2 March
2022. A range of additional finance pressures have been identified
including additional national insurance contributions, energy cost
inflation, contractual commitments as well as significant construction
inflation coming through the capital programme. To help mitigate the
impact of cost pressures in 2022/23 the Cabinet report dated 7 June
2022 included the earmarking of funds:-
• Contribution to the Loans Fund to support the 10 year Capital
Investment Programme and address rising cost pressures, £2.569m; 
• Provision for contractual electricity and gas price increases for
2022/23 to reflect current market inflationary levels, £1.066m; 
• Provision for additional non-contractual inflationary pressures (e.g.
food costs, fuel, etc.), £0.822m
Further, due to the creation of IJB unearmarked reserves, an
acceleration of early repayment of IJB debt owed to the Council will
be actioned during 2022/23, therefore releasing resources to help
address the £10.3m Budget gap for 2023/24. Finally, the Budget for
2023/24 was approved at Council on 1st March 2023. The budget
included savings of £5m, a 5% increase in council tax and use of
reserves totalling £3.5m. The indicative gap for 24/25 is over £17m
with use of reserves planned at £5m. This will continue to present
significant challenges to the Council.
4 5
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 20
111

Page 112

Strategic Risk Action Plan Date Updated 25-Jan-2023
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Regular financial monitoring of Revenue and
Capital Budgets  
25 January 2023: 
Bi-monthly monitoring  
31-Mar-2024 Mark Boyd 
Deliver balanced Budget for 2023/24 and
outline Medium Term Financial Plan
1 March 2023:
23/24 Budget approved 1 March 2023
01-Mar-2023 Mark Boyd 
Maintain Financial Governance
Arrangements for IJB  
25 January 2023:
Bi-monthly monitoring.  
31-Mar-2024 Mark Boyd 
Progress dialogue via COSLA with Scottish
Government on a range of areas including
fair funding, multi-year settlements,
reduction in levels of ring-fenced resources,
true costs of SG policy areas, financial
flexibilities and a New Deal partnership with
SG and local Govt
25 January 2023:
Regular engagement through Directors of finance group
31-Mar-2024 Mark Boyd 
112

Page 113

Risk Code SRR2324_R02 Risk Title Inequalities Latest Note Date 25-Jan-2023
Risk Owner Audrey Sutton/Caroline Cameron
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
North Ayrshire residents, and in
particular certain excluded groups, will
experience increasing levels of poverty
and its effects, as a result both of the
economic situation and Covid-19. 
Health inequality is closely linked to
poverty, employment and people's
earliest experiences as children, and will
increase. 
The population of North Ayrshire is
projected to fall over the next 10 years
but there will also be a larger proportion
of the population considered dependent
(not economically active).  
The impact on specific risk groups is
greatest for our children, young people
and families, unemployed people and
those in in-work poverty and people
exposed to the risks of drug and alcohol
addiction. 
Demand for HSCP and Council Services
will increase. 
As reductions in resources increase,
early intervention and prevention
activities are at risk, thus increasing the
potential for an increase in costly crisis
interventions. 
The local economy will be impacted by
reduced spending power by
economically inactive residents.  
The HSCP re-affirmed its commitment to Tackling Inequalities by
continuing to consider it a key priority with the Partnership’s Strategic
Plan.
Through the HSCP strategic plan, the Partnership sets out actions to
tackle inequality through its Partnership Pledge and across its strategic
priorities. Tackling inequalities is addressed across HSCP service
areas. An example of actions to help address local inequalities include:
Establishing the Money Matters service in 9 GP practices and 7 local
schools in the more deprived areas of North Ayrshire. This will improve
accessibility of the service to those who would benefit most.
Increase the number of employability mentors in Justice Services, to
support those with experience of the justice service into meaningful
employment or training opportunities and to help divert away from
criminal behaviours.
Working closely with Housing colleagues to ensure formerly looked
after young people can access a positive and stable housing
destination.
In our Drug and Alcohol Services, we are implementing actions to
reduce the number of local drug and alcohol related harms and deaths.
This includes implementing the national MAT (Medicated Assisted
Treatment) standards and increasing the number of ABIs (Alcohol Brief
Interventions) delivered across North Ayrshire.
Through the Caring for Ayrshire programme, we have set out a phased
approach to improve local primary care premises (GP Practices and
Health Centres). This will improve overall professional capacity within
GP practices for Multi-Disciplinary Teams, ensuring the right support is
available for local people with health concerns.
5 4
Status Risk Score
Heat Map 
Change in Score Approach
No Change Treat
Stable 20 
113

Page 114

Strategic Risk Action Plan Date Updated 25-Jan-2023 
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG
The Communities and Education Directorate considers reducing inequalities to be at the heart of its work. 
The Directorate leads the Community Planning Partnership for the Council and the CPP has recently developed a
new Local Outcomes Improvement Plan, the purpose of which is reducing inequalities. The themes are Wellbeing,
Work and World. Locality Planning priorities and CIF funded initiatives are also focused on a range of inequalities,
including poverty, age-related inequalities and digital inequalities.
The Directorate also leads the work of the Child Poverty and Cost of Living Board, chaired by the Council Leader.
The four strategic themes of the Board to date have been:
• No Wrong Door – access to services
• Employability
• Food
• Islands 
Progress has been made with partners through a series on mini-enquiries, ensuring that lived experience
influences developments and actions. 
The commitment to reducing inequalities is also reflected in the Communities and Education Directorate plans: 
• the Educational Service Improvement Plan
• Connected Communities strategic plans and
• Facilities Management plans.
Examples of actions to reduce inequalities:
• Deployment of Scottish Attainment Challenge funding to reduce the poverty related attainment gap in
schools
• Use of the Pupil Equity Fund to ensure equity of pupil experience in schools, at the discretion of head
teachers
• Cost of the School Day actions to reduce, for example, the cost of school uniforms and clothing, food and
outings
• Support for care experienced young people, both in schools and through youth services
• The Fairer Food Network, with 14 community larders which support the needs of individual communities
• A network of warm spaces and events to mitigate energy use and social isolation
• Work to support “New Scots,” in schools, with families and in community settings through language support
and capacity building, including women’s groups
• LGBT support groups for young people and those over 18
• Mentoring support for young people in secondary schools through a partnership with MCR Pathways
• Participation strategies for children young people and adults to ensure our strategies and investment are
informed by as wide a range of view as possible.
25 January 2023:
Each of these strategies, taken
together, and further developed
and implemented, should make
a significant contribution to
inequalities. 
Actions are being progressed
and remain within the Target
date for completion.
31-Mar-2024 Audrey Sutton;
Caroline Cameron 
114

Page 115

Risk Code SRR2324_R03 Risk Title Financial Sustainability of the Health and Social Care Partnership Latest Note Date 23-Jan-2023 
Risk Owner Caroline Cameron
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Uncertainty of future funding against growing
demand and demographic pressures.
Resources have not kept pace with the demand for
and cost of social care services. The budget
settlement for 23-24 is extremely challenging with a
gap of around £7.5m across the IJB.
There remains uncertainty around Covid-related
costs with no additional funding for these beyond
the end of 22-23.
In earlier years, the HSCP did not manage to
contain spend within the delegated budget, but
surpluses were achieved in 20-21 and 21-22.
Current projections are that the Partnership will also
achieve a small surplus in 22-23.
Outstanding debt to the Council is currently
£2.321m but it is planned to clear the debt by the
end of the 22-23 financial year.
Current Scottish Government proposals to introduce
a National Care Service (NCS) by 2026 will
significantly impact on the IJB.
Significant inflationary pressures across employee
pay and contractual costs will increase the financial
challenges for the Partnership.
Low-volume high-cost care packages continue to
present a financial challenge to the Partnership.
Funding levels could result in savings being
made that are not in alignment with the
strategic plan. This could impact on the future
demand levels e.g. reduction in early
intervention and prevention means that future
demand is increased. 
Funding levels increase the requirement to
transform services at scale and pace.
The impact of the National Care Service will
become clearer as legislation is progressed.
The IJB actively monitors the financial position with
regular detailed reporting. Directors of Finance of the
Council and Health Board have oversight and regular
updates are provided to the Council's Cabinet.
There is an integrated approach to managing the
totality of NHS and Council resources delegated to
the IJB. The Medium Term Financial Outlook will be
refreshed for 2023-26 and presented to the IJB in
March 2023. Previous financial settlements have
seen both partners meet the Scottish Government
settlement conditions with any additional resources
passed to the IJB.
The IJB had uncommitted financial reserves of
£7.248m at the beginning of April 2022, which
equated to around 2.6% of the budget. This is
towards the lower end of the good practice target of
2%-4%.
Significant funding has been provided to IJBs for the
Covid-19 response, supported by regular financial
returns to the Scottish Government. Costs were fully
funded in 20/21, 21/22 and 22/23. 
The Partnership has a Transformation Board
overseeing the programme of service re-design.
3 4
Status Risk Score
Heat Map 
Change in Score Approach
Remain at 12 Tolerate
Stable 12 
115

Page 116

Strategic Risk Action Plan Date Updated 23-Jan-2023 
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Budget Monitoring - Regular budget
monitoring reports to IJB are effective.  
23 January 2023:
No additional actions planned at this time but will keep under review
31-Mar-2024
Caroline Cameron;
Paul Doak 
Corrective Action – Transformation Board is
effective  
23 January 2023:
No additional actions planned at this time but will keep under review.
31-Mar-2024
Caroline Cameron;
Paul Doak 
116

Page 117

Risk Code SRR2324_R04 Risk Title Cyber Security Latest Note Date 19-Jan-2023 
Risk Owner Fiona Walker
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The potential compromise of business
operations or a data breach orchestrated via
either digital channels or the IT
infrastructure. This can include targeting of
the user base. Risk derives from both
Council operations and those of its supply
chain. 
The increasing importance of delivering
services through digital channels and
maximising efficiency through effective and
secure use of technology. This includes a
growing adoption of cloud-based computing
resources which extend processing
capabilities, and associated risks, beyond
the Council’s network. 
The response to the Covid-19 pandemic
resulted in the remote and mobile working
by staff as effectively being the normal
working practice. This is likely to continue as
a hybrid approach becomes the new normal. 
Such a distributed work force increases the
complexity of protecting against cyber and
data protection risks.  
Failure by Services to adopt and comply
with strategies, policies and procedures
may result in a failure to adequately ensure
the desired levels of cyber-security required
to maintain and protect council systems and
data. 
There may be a significant impact on the
authority through the release of personal
and/or sensitive information resulting in a
loss of public confidence and significant
financial loss incurred through fines and
service disruption. 
A successful cyber-attack (malicious
external or internal action) on the Council’s
IT environments could also result in
significant service disruption, loss of income
streams and possible data loss/exposure. 
Impacts of a cyber-attack could include
economic (i.e. inability to collect online
payments), societal disruption (i.e. loss of
diaries and client appointments), and
reputational damage (i.e. loss of public
confidence in digital services).  
It is recognised that it is not possible for any
organisation to expect to be completely protected
against continually evolving cyber threats. A threat
actor with sufficient motivation, resource and capability
will be able to compromise the most secure system. 
The Council takes a sociotechnical approach to
reducing risk by continually developing protective
measures through technical, organisational and
people-focused controls. 
Technical controls are implemented in areas such as
network defences, secure configuration of systems,
user authentication, malware protection, and
vulnerability management. These are based on best
practice and independently tested on an annual basis
to confirm their effectiveness in accordance with
compliance schemes. 
The Council maintains a comprehensive set of
policies, standards, guidelines, metrics and reporting
mechanisms as part of its information security
governance structure. A comprehensive training and
awareness programme is delivered to nurture a cyber-
aware workforce and culture.
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16 
117

Page 118

Strategic Risk Action Plan Date Updated 19-Jan-2023
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Incident Detection and Response – Recent
cyber-attacks on public sector organisations
highlight the need for robust incident
detection and response procedures and
technologies. The current response
procedures been shown to be effective
based on incidents experienced so far,
however detection capabilities will need to
be reviewed and improved.  
19 January 2023:
In progress – A joint procurement of a Managed Security Operation
Centre (SOC) service with other local authorities is being taken
forward by the Digital Office.  The procurement was expected to be
completed December 2022 however the Digital Office recruitment of a
new chief information security officer (CISO) has delayed this.
31-Mar-2024 Fiona Walker 
19 January 2023:
In progress – Work is ongoing to implement a security information
and event management (SIEM) solution to allow log collection and
detection by a SOC. A proof of concept (POC) is planned with a
potential SOC provider to advance the SIEM implementation.
Procurement of a SOC will also help to complete this action.
31-Mar-2024 Fiona Walker 
19 January 2023:
In progress – The investigation of potential options and quotes is still
underway with Aon.  The risk assessment is complete and will now be
used in discussions to establish whether it is possible to broker for
quotes.  
31-Mar-2024 Fiona Walker 
Training and Awareness – The pandemic
has impacted on the cyber training
programme with the long-term cancellation
of all classroom-based training. However, a
new online course was launched to
compensate for this.  
19 January 2023:
In progress – Face to face training has resumed with sessions being
organised to tackle the backlog caused by the pandemic. Phishing
simulations have also been restarted and will continue to be ran to
test the effectiveness of training and raise awareness.
Ongoing Fiona Walker 
118

Page 119

Risk Code SRR2324_R05 Risk Title Transformation Latest Note Date 25-Jan-2023
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
There is an overarching risk that
transformation and change management
activities, which are core to the future
delivery models and long-term financial
sustainability of both the Council and Health
and Social Care Partnership, fail to deliver.  
Failure to deliver transformational change
will impact on the Council’s financial
sustainability, effectiveness of service
delivery and delivery of the outcomes set
out in the Council Plan 2019-24 and the
Local Outcome Improvement Plan (LOIP). 
Failure to deliver the HSCP Transformation
programmes across the Partnership,
involving North Ayrshire Council (NAC) and
NHS Ayrshire & Arran (NHSAA) services
may lead to the identified outcomes not
being delivered; resulting in financial
instability, reduced performance,
deteriorating patient outcomes, and
reputational damage within North Ayrshire
Health and Social Care Partnership
(NAHSCP). 
Failure to embed cultural transformation
activities may lead to difficulties in building
future workforce capacity and in ensuring
we have an engaged, skilled and
knowledgeable workforce to meet service
demand.  
The transformation programme aligns to the Council Plan and is
monitored via the Transformation Board.
Workstreams have been developed across Transport and Travel,
Accessing our Council, Land and Property and Sustainability. 
HSCP have an established Transformation Board to closely monitor
progress with plans, regular updates on programme to the IJB and
regular meetings with the Chief Executive and S95 Officer to review
progress and mitigation plans. IJB approved budget and Strategic
Plan for 2022-23 which align with financial plans with transformational
strategic change ambitions.
Cultural transformation activities continue to evolve to support the
Council’s transformation and improve effectiveness and capability.
This includes sharing learning and skills, engagement, design
experiments and a whole systems approach to transformation and
change. 
Our workforce planning approach utilises a variety of tools and
techniques, such as career development, succession planning,
vacancy management, redeployment and early release schemes to
ensure our workforce requirements for the future, in terms of skills and
capabilities, are planned. Each Head of Service has a workforce plan,
and these are monitored six-monthly with continued HR support and
guidance to ensure service review and redesign of the workforce is on
track. 
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16 
119

Page 120

Strategic Risk Action Plan Date Updated 25-Jan-2023
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Existing project level governance and
controls remain effective and are constantly
reviewed. 
25 January 2023:
Progress on Transformation projects continues to be governed and
monitored via the Transformation Board which is chaired by the
Chief Executive. Meeting at the end of March will consider the next
phase of projects required for delivery to address the significant
financial challenges in 2024/25
Quarterly Mark Boyd / Chief Executive
and Executive Directors 
120

Page 121

Risk Code SRR2324_R06 Risk Title Climate Change Latest Note Date 24-Jan-2023
Risk Owner David Hammond
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Climate change is expected to continue and
worsen in the future if no action is taken,
with increases to mean global temperatures,
sea level rises and the increasing frequency
and severity of weather events such as
floods, heatwaves, droughts and storms. 
More frequent and intense heavy rainfall
events increase the risk of soil erosion and
flooding. 
Rises in mean sea level increases risks of
coastal erosion, flooding, saltwater intrusion
and soil salinisation (risk to agricultural land
and freshwater habitats). 
Severe weather is already affecting public
services across Scotland, with operational,
reputational, financial and legal
consequences. 
There is also an ongoing impact of severe
winter weather including snowfall and
freezing temperatures which impact service
delivery and the integrity of our roads open
space and buildings infrastructure. This shift
in weather patterns caused by climate
change is also affecting biodiversity across
Scotland.  
Increased frequency of severe weather
conditions and flooding events may lead to
more instances of damage to Council
infrastructure and property, interruptions to
service delivery and increased demands on
services, often with little notice. 
Risk to life, transport disruption and
pollution to the local environment, as well as
impact adversely on the local economy if
businesses are unable to operate. 
Council requirement to provide immediate
response and manage the adverse effects
of more frequent and severe weather
emergency situations, including support to
local communities and businesses. 
The Council is required to comply with the
‘Public Bodies Climate Change Duties’
under the Climate Change (Scotland) Act
2009. These duties require the Council to
assess the risks, threats and opportunities
associated with climate change and identify
actions to increase resilience to climate
change.  
North Ayrshire Council declared a Climate Emergency in June 2019,
committing to act on climate change and reduce carbon emissions.
In January 2020 the Council approved the target to become net-zero
carbon by 2030, for both Council estate emissions and area-wide
emissions.
The third iteration of the Environmental Sustainability & Climate
Change Strategy was approved by Cabinet in May 2021, providing a
road map to achieve the net zero carbon emissions by 2030 target. 
Climate Change Adaptation has been included as a workstream
within the new strategy, utilising Adaptation Scotland’s Capability
Framework to ensure North Ayrshire takes a strong, proactive
approach to adapting to climate change.  Officers are participating in
the Sustainable Scotland Network’s ‘Adaptation Scotland
Benchmarking Group’ to learn and share best practice with other
local authorities.
The Flood Risk Management Strategy has been developed into a 6-
year plan which began in 2016. A second plan, which will follow on,
is in development. 
In addition, actions to mitigate Climate Change risk are held within
strategies such as the Core Paths Plan, Outdoor Access Strategy,
Local Biodiversity Action Plan, and Weather and Winter
Emergencies Plan. Asset management plans are in place which are
regularly reviewed for our Roads, Fleet, Housing, Property and Open
Spaces. 
Furthermore, through the Ayrshire Civil Contingencies Team there
are emergency planning arrangements in place in the event of
severe weather and flooding conditions causing major disruption and
damage to the area or to individual communities within it. 
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16 
121

Page 122

Strategic Risk Action Plan Date Updated 24-Jan-2023
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG
Reducing Carbon Emissions:
North Ayrshire Council declared a Climate Emergency in June 2019, committing to
act on climate change and reduce carbon emissions. In January 2020 the Council
approved the target to become net-zero carbon by 2030, for both Council estate
emissions and area-wide emissions.
The Council has taken action against climate change since our first Carbon
Management Plan in 2006/07, by working to reduce emissions associated with
Council services, and using the baseline year of 2005/06 from which to measure
progress.
Since the baseline year of 2005/06, Council estate emissions have reduced by
67.8%, from 67,719 tonnes of carbon dioxide equivalent (tCO2e) to 21,794 tCO2e (a
reduction of 1,052 tCO2e from the previous year). Area-wide emissions are published
by BEIS two years in arrears. Total emissions have reduced across North Ayrshire by
49%, from 1,437 kilotonnes of carbon dioxide (ktCO2) in 2005 to 730 ktCO2 in 2020.
To ensure North Ayrshire Council can develop a leading, cross-sector and community
led approach we established a Climate Change Steering Group (CCSG) in 2021. The
CCSG is chaired by the Cabinet Member for Economy and Climate Change and
brings together young people, local businesses and community organisations from
across North Ayrshire.
Existing controls remain effective and are under review as our response to climate
change develops and we progress towards achieving net zero by the 2030 target.
24 January 2023:
Continuing the Implementation of the 3rd Environmental Sustainability
& Climate Change Strategy, which Includes a Roadmap with actions
towards achieving the target. The ESCCS 3 contains workstreams: 
• Affordable Warmth 
• Green Economy 
• Transport and Travel 
• Natural Environment 
• Sustainable Operations 
• Carbon Absorption 
• Climate Change Adaptation, which follows Adaptation Scotland’s
Capability Framework, to build a climate resilient North Ayrshire. 
Across seven thematic workstreams (Affordable Warmth, A Green
Economy, Transport & Travel, Natural Environment, Sustainable
Operations, Carbon Absorption and Climate Change Adaptation), 65
actions have been identified and progressed over the course of the
ESCCS 3 period. Updates on progress are provided through the
Council’s performance reporting system, Pentana, on a quarterly
basis. These actions are designed to be directly and indirectly
responsible for carbon reduction and deliver other socio-economic
benefits.
Officers started preparation of 4th Environmental Sustainability &
Climate Change Strategy.
31-Mar-2023 David
Hammond 
Flood Risk Management Plan:
Cycle 2 of the Ayrshire Local Flood Risk Management Plan has been developed and
published on 31st December 2022.
Studies and modelling will be undertaken to identify and prioritise vulnerable areas
where financial damage and risk to life are most likely.
There is an ongoing programme of monthly inspections of debris screens which have
been installed to prevent vulnerable culverts from blocking and causing flooding.
CCTV inspections of culverts are also undertaken to identify blockages and
deterioration of assets that might cause flooding. This has been effective in reducing
flooding, although there are capacity issues which this process cannot address.
The Upper Garnock Valley FPS has been substantially completed and is currently
providing flood protection.
24 January 2023:
We will undertake the actions outlined in cycle 2 of the Ayrshire Local
Flood Risk Management Plan. We will continue to look for
opportunities to implement Natural Flood Management and we will
develop a range of further flood protection measures which can be
put forward as schemes for inclusion in cycle 3 of the ALFRMP.
We will complete the Millport Coastal FPS and the Mill Burn FPS.
Inspections and CCTV surveys of culverts and screens will continue,
including prioritised maintenance. Efforts will be made to continue to
identify unknown culverts and add them to the ongoing inspection and
maintenance process.
30-06-2028 Thomas
Reaney 
122

Page 123

Risk Code SRR2324_R07 Risk Title Community Capacity Building and Empowerment Latest Note Date 20-Jan-2023
Risk Owner Rhonda Leith
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Unrealistic timescales for implementation of
aspects of legislation of the Community
Empowerment Act (Scotland) 2015, such as
Community Asset Transfer. 
Pressure to support community capacity
building and the variation of needs within a
reducing workforce. 
Duplication of effort across HSCP and
Locality Partnerships to foster community
participation and deliver engagement
activities.
Complying with the complex consultation
legislation in service redesign.  
Rising energy and utility costs relating to
property management.
Budget savings and pressure on property
maintenance budgets.
Where the risk is not managed effectively
the potential benefits of community capacity
building and empowerment may be lost. 
Widening inequality gap between those
communities where levels of capacity and
engagement with the empowerment agenda
are high and those with less social capital
where interest remains low, which
constrains the ability to influence the
planning and delivery service. 
Any disconnect between the Council’s
aspirations, community appetite for
increasing ownership of assets and what
communities themselves feel able and
prepared to commit to can result in
community assets reverting back to Council. 
Accelerating asset transfer risks losing
services and facilities. 
Over-engagement carries disengagement
and engagement fatigue.  
Increased property costs can be a deterrent
for organisations engaging and completing
the CAT process.
Lack of budget to undertake proactive
maintenance may result in NAC buildings
falling into disrepair detracting organisations
from progressing to lease and or ownership
of NAC assets.
Ongoing commitment to community empowerment
and locality partnerships from CPP. 
Six locality partnerships and alignment with HSCP
locality arrangements. 
Leadership of the CPP Senior Officers’ Group. 
Enabling approach with community partners and
support with third sector interface to build capacity and
identify opportunities for growth and sustainability. 
Reviewed guidance and processes relating to asset
transfer, allotment and Community Councils. 
Participatory budgeting approach local grants,
commitment to PB with partners and leading practice
in mainstreaming participatory approaches 
External funding bid help for groups through regular
meetings with third sector, funders and funding
officers. 
Membership of The Consultation Institute.  
Additional investment of £1m for a Community Asset
Transfer Start Up Fund, prioritising additional staffing
capacity to support CAT in Connected Communities
and TACT.  
A collaboration and shared resource approach across
Connected Communities Teams will be taken to
ensure the Service deliver on this priority.
3 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Tolerate
Stable 12 
123

Page 124

Strategic Risk Action Plan Date Updated 23-Jan-2023
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Implementation of CEA: 
Existing controls remain effective and are
kept under review.
23 January 2023:
Strategic CLD Plan 2021-2024 identifies priorities for capacity
building and the programme of community support is addressing
needs. Community larders and Community Cafes are being
supported by the NA Food System and Connected Communities staff
to ensure the network can be sustained and develop further. All other
actions are being progressed and remain within the target date for
completions.
31-Mar-2024 Rhonda Leith 
Implementation of CEA:
Existing controls remain effective and are
kept under review to monitor impact and
performance.  
23 January 2023:
A New Local Outcomes Improvement Plan for 22-30 was approved
by the CPP Board in March 2022. Work is now being undertaken to
develop and implement the LOIP action plan to continue to work to
improve outcomes for our communities across North Ayrshire.
31-Mar-2024 Rhonda Leith 
Staff capacity: 
Existing controls remain effective and are
kept under review, Recruitment remains a
challenge. 
23 January 2023:
Ongoing review and monitoring on progress of CAT applications. 
31-Mar-2024 Rhonda Leith 
Alignment of engagement:
Existing controls remain effective.
23 January 2023:
Actions are being progressed and remain within the target date for
completion. Ongoing focus to ensure the right balance of time and
resource to community / stakeholder engagement aligning to the
Consultation Institute frameworks.
31-Mar-2024 Rhonda Leith 
Consultation: 
Existing controls remain effective and hybrid
engagement models have been
implemented post covid to encourage and
provide greater access to participation.
23 January 2023:
Actions are being progressed and remain within the target date for
completion. Ongoing focus to consultation and engagement.
31-Mar-2024 Rhonda Leith 
124

Page 125

Risk Code SRR2324_R08 Risk Title National Care Service Latest Note Date 25-Jan-2023
Risk Owner Craig Hatton
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The proposals for a National Care Service
represent one of the largest reorganisations in
local government since the creation of local
authorities in 1995/96.
Uncertainty around future delivery models and the
scope of the National Care Service, leading to
uncertainty around the level of local authority
resources which will be transferred to the National
Care Service and also the level of funding to cover
the remaining local authority services, with the
Social Care Budget accounting for almost one third
of local government expenditure.
Complexity in the transferring of one of local
government’s most significant and important
services, therefore resulting in considerable staff
resourcing to undertake this task, as well as
considerable financial cost.
The arrangements for Children’s Services are still
to be determined, but if these are removed from
the local authority there are risks arising from the
arm’s length proximity to Education.
Tight timescales for implementation by the end of
the current Parliamentary term in 2026, when
boundaries and service scope are uncertain.
Impact on local government revenue and capital
funding.
Potential impact on all corporate support
services.
Delays in the implementation of existing
priorities and commitments as a result of
diverted resource.
Potential loss of ‘whole service’ approach within
local government that benefitted from shared
leadership and links across essential services.
Uncertainty created for the council’s workforce
which may result in a loss of existing talent and
experience as well as difficulties with
recruitment.
Risk to the ongoing work and service delivery by
the Council into Children’s Services if these are
removed from the local authority.
Challenges around agreeing the funding of all
historic borrowing attached to Social Care
assets. 
Reducing the capacity of local authorities
exposes civil emergency arrangements to new
risks.
Engagement within the Health & Social Care Partnership
with lead professionals, input by Senior Managers within
the HSCP and consideration by the Partnership Senior
Management Team on the Scottish Government’s
proposals for the National Care Service.
The North Ayrshire Integration Joint Board approved
their response to the consultation at their meeting of 21
October 2021.
Cabinet approved their response to the consultation at
their meeting of 2 November 2021.
Participation in the annual National Care Service Forum,
with the first meeting held on 3 October 2022.
5 4
Status Risk Score
Heat Map 
Change in Score Approach
New risk Treat
Increasing 20 
125

Page 126

Strategic Risk Action Plan Date Updated 27-Jan-2023 
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG
Further actions will be identified and undertaken once details are known around the scope of the National Care Service
and timescales for implementation.
A detailed response plan will be prepared which will detail the preparations required in order to mitigate any risk.
27 January 2023:
Actions will be identified and
progressed in due course.
31-Mar-2026
Caroline
Cameron/Mark
Boyd/Craig Hatton 
126

Page 127

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Cost of Living: Financial Inclusion Strategy 2023-28 
Purpose:  To provide an update to Cabinet on progress with the
Financial Inclusion Project and the development of a
Strategy for North Ayrshire 
Recommendation:  It is recommended that Cabinet notes the positive progress
through the review of Financial Inclusion Advice Services
and approves the  Financial Inclusion Strategy for 2023-28. 
1. Executive Summary 
1.1 This report provides an update to Cabinet following the report presented in
November 2022, providing an overview of the current position with the review of
Financial Inclusion services and presents the North Ayrshire Financial Inclusion
Strategy for 2023-28. 
1.2 As part of the Council’s Transformation Programme and in response to the
incidence of poverty in North Ayrshire and the Cost-of-Living crisis, a review of
Financial Inclusion services across the Council is being progressed at pace.  The
previous update to Cabinet outlined the intention to join up Money Matters and
the Welfare Reform and Advice Team, and further to incorporate the key
principles of the holistic approach of Better Off.   
1.3  The review has now moved into the implementation phase. The new Senior
Manager  (Financial Inclusion) commenced in January and is now working with
the Council’s Transformation Team to develop and implement new systems and
processes for the integrated team, which ultimately will support advisers to
achieve better outcomes for beneficiaries of the service.         
1.4  The Senior Manager has also collaborated with wider stakeholders, including
through the Project Board, to develop a Financial Inclusion Strategy for North
Ayrshire 2023-28. The Strategy is included as Appendix 1. The Strategy provides
in some detail the  intentions for 2023-24 and will be refreshed for 2024-28
following full consultation with key stakeholders, the public and with staff teams. 
Agenda Item 9
127

Page 128

2. Background 
2.1 As part of the Council’s Transformation Programme and in response to the Cost-
of-Living crisis, a review of Financial Inclusion services across the Council was
progressed during 2022. The high-level outcomes were reported to Cabinet on
29 November 2022. 
2.2    A new Senior Manager post was created, and  the successful candidate took up
post on 9 January 2023.  The Senior Manager will lead the joined-up financial
inclusion services across North Ayrshire, with responsibility for integrating the
teams and developing the Council’s financial inclusion strategy.  The Financial
Inclusion Project has Chief Officer Sponsorship within the HSCP, recognising the
importance to ensure the delivery phase of integrating and developing financial
inclusion services, is progressed at pace. 
2.3 Project Board and Project Team membership has now been reviewed to support
the delivery plan. The Project Board is chaired by the HSCP Director and the
Project Team by the Senior Manager (Financial Inclusion).  Membership of the
Project Board will continue to be senior managers of advice services and key
referring agencies, as well as of the Transformation Team.  Advice service and
Transformation Team managers will form the membership of the Project Team.
Partnership Engagement (HSCP) and Communication Officers have been added
to support consultations during 2023-24 and to develop and implement a
communications plan.   
2.4   In addition to the £258k funding approved by Cabinet in August 2022, the following
additional funds have been aligned to to progress the Financial Inclusion
Strategy, including the commissioning of debt advice services: 
Funding agreed Source
£258,000 Cost of Living budget
£380,000 Employability earmarked reserves (originally the
Better Off demonstrator budget)
£15,000 NAC ‘Islands Budget’ 
£100,000 Funding allocated as part of NAC budget 2023-24
(up to £100k)
£753,000 TOTAL 
The above funds will be used to cover costs including: 
• Commissioning of an independent debt advice service for North Ayrshire for
2 years
• Extension of the Better Off pilot as required to ensure smooth transition and
continuity of service  – currently agreed until end June 2023
• Development of case management system and IT infrastructure 
• Salary plus costs for the Senior Manager post for 24 months
• Marketing materials associated with a Communications Plan 
2.5   A Financial Inclusion Strategy has been developed detailing intentions for 2023-
128

Page 129

24. They include an intention to undertake a strategy refresh for 2024-28, which
will follow a series of consultations with key stakeholders and the public. Staff
teams will be active participants in that process. 
The Financial Inclusion Strategy and intentions for 2023-24 
2.6 The current cost-of-living crisis has necessitated an emergency response and
the Financial Inclusion Strategy reflects on the impact of the current economic
situation on our services and details our immediate response to meeting the
needs of people in our communities in 2023-24. It also incorporates and builds
on the work of the Transformation team in relation to the whole systems approach
and streamlining customer journeys. 
2.7 The cost-of-living crisis is having the greatest impact on low-income households,
particularly people with disabilities or long-term health conditions, lone parent
families and people in rural and island communities, who have higher costs for
some goods and services including off-gas grid fuel costs and transport.   
2.8 However, there is also increasing demand for debt advice from people who sit
just above the benefits entitlement threshold and from people who were
traditionally less likely to access advice services e.g. homeowners and
professional people. Debt repayments are not deducted from income for the
purposes of determining whether a household is living in poverty, but they do
reduce the amount of disposable income available for essential goods and
services and there is an increased risk of material deprivation. 
2.9 Financial exclusion is closely linked with poverty and social exclusion and is a
significant contributor to child poverty. Financial inclusion services enable and
empower people to access the information, advice and support they need to
maximise and effectively manage their disposable income, to be less likely to fall
behind with bills, more able to deal with unexpected expenses, have improved
mental and physical health and to become more active in their communities.
Ultimately, they enable people to have the knowledge, skills and confidence to
feel more secure and in control of their personal finances. 
2.10 In North Ayrshire, the number of people reporting that they are managing well
financially saw a significant drop between 2018 and 2019, having gone down
from 62% to 49%, whilst across Scotland numbers remained relatively static. In
addition, since 2017 there has been an increasing number of adults with no
savings, against a slight reduction nationally. (Local Child Poverty Dashboard).  
In North Ayrshire, demand for both welfare rights and debt advice is continuing
to increase. 
2.11 Financial Inclusion services encompass a range of providers across the sectors.
The primary focus in the Strategy for 2023-24 is on the main public sector funded
welfare rights and debt advice services available to people in North Ayrshire.
Over the next year, a full consultation process will be undertaken with the public
and key stakeholders along with a detailed mapping and analysis of local
financial inclusion services provision. Through this process the strategy will be
reviewed and refreshed for 2024-28 and a longer-term cross-sector delivery plan
129

Page 130

put in place encompassing wider financial inclusion services.   
2.12 A key outcome will be the creation of a Financial Inclusion Partnership in North
Ayrshire.  The Partnership will be inclusive with representation from a range of
key stakeholders including for example advice services, 1st Alliance Community
Bank, fuel poverty advice services, employability, education and housing
services, housing associations, community link workers, the Food Bank and
Alcohol and Drugs Partnership.   The creation of a Partnership will foster
collaboration and enable a joint approach, making the best use of all available
resources, to mitigating the impact of the cost-of-living crisis on individuals,
families and communities in relation to entitlements, managing money, debt,
financial literacy, digital inclusion, affordable lending, fuel poverty, health and
more.   
2.14 Timeline for key deliverables in 2023-24 
Key Strategic Milestones Completion
Money Matters and Welfare Reform and Advice Team managers
aligned to Senior Manager (Financial Inclusion)
Q1
Advice service organisational restructure as required for merged in-
house service
Q1
Communications Plan developed and implemented  Q1
Financial Inclusion cross-sector Partnership established Q1
Online Referral pathway live (Accessing our Council whole system
approach)
Q1
Welfare Rights advice services embedded within Employability
services
Q2
Universal Debt Advice service for North Ayrshire commissioned and
taking referrals
Q2
Performance Management Framework developed for  case
management system
Q2
Development of interactive online map for location of advice and
related services eg public wi-fi
Q2
Review and development of holistic approach including  ‘referrals
out’ pathways, access points 
Q3
Implementation of integrated case management system which
incorporates the quality assurance and performance management
frameworks.
Q4
Strategy refreshed and agreed Q4 
3. Proposals 
3.1  It is proposed that Cabinet notes the progress of the Financial Inclusion Project
Board to date. It is further proposed that Cabinet approve the Financial Inclusion
strategy which has now been developed to take forward the delivery phase of the
transformation of Financial Inclusion services, together with the commissioning
of debt advice services and more detailed analysis and consultations to refresh
130

Page 131

the strategy for 2024-28. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The report outlines the plans to utilise the £753k available through the project to
improve financial inclusion services in North Ayrshire.  These services provide
significant levels of additional income for local people, through supporting them
to access benefits to which they are entitled. They also support people to reduce
outgoings thus increasing their disposable income, to better manage their money
and to put manageable debt strategies in place where this is required.  Therefore
the financial gain to our local area and communities will be in excess of the
investment. 
Human Resources 
4.2 Creation of a joined-up financial inclusion team will result in the closer alignment
of teams which are currently in separate structures in the HSCP and Housing.
Appropriate engagement will be undertaken with teams and trade unions as part
of the change process. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Financial inclusion services provide local people with a range of support services
and access to financial benefits. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Financial inclusion services support the Council priority -” Aspiring Communities”. 
Community Wealth Building 
4.7 Maximising disposable income combined with improved financial literacy and
budgeting skills for local people will support spend in the local economy. 
5. Consultation 
5.1 Consultation has taken place with the leads for financial inclusion services
throughout the service review and in the gathering of information for this report.
Caroline Cameron
Director, Health and Social Care Partnership
131

Page 132

For further information please contact Sheena Campbell, Senior Manager
(Financial Inclusion), North Ayrshire HSCP, on sheenacampbell@north-
ayrshire.gov.uk. 
Background Papers 
Financial Inclusion Strategy for North Ayrshire 2023-28 
132

Page 133

North Ayrshire Financial Inclusion Strategy 2023-2028 1
North Ayrshire Financial 
Inclusion Strategy 2023-28
133

Page 134

North Ayrshire Financial Inclusion Strategy 2023-2028 2
Contents
North Ayrshire Financial Inclusion Strategy: Introduction 3
Financial inclusion alignment with strategic ambitions to 2030 4
Our guiding principles 2023-24 5
What success will look like... 6
What is financial inclusion 7
Economic context - national 8
Economic context – local 9
The role of financial inclusion services in tackling poverty 11
North Ayrshire financial inclusion services - current position 13
North Ayrshire financial inclusion services - moving forward 18
Appendices
Appendix 1: Advice service access points in North Ayrshire 20
Appendix 2: Strategic links and references 23
Appendix 3: North Ayrshire financial inclusion services 24
Appendix 4: Drivers of poverty flowchart (alternative text) 25
134

Page 135

North Ayrshire Financial Inclusion Strategy 2023-2028 3
‘Financial inclusion’ refers to the ability of 
individuals to access appropriate financial 
services or products to manage their money
effectively.  
Financial inclusion services are intended to 
provide access to the best financial advice and 
products to support people to build their 
financial resilience and confidence to manage
their money and deal with financial difficulties.
Poor financial wellbeing impacts on all aspects
of life and can leave lasting damage on future
life chances. Advice and support services are
delivered by a range of service providers across
the sectors. 
North Ayrshire Council and the Health and 
Social Care Partnership take pride in a 
co-production approach to strategic planning,
through having meaningful engagement with
our communities. However, the current 
cost of living crisis has necessitated an 
emergency response, and this Financial 
Inclusion Strategy reflects on the impact of 
the current economic situation on our services
and details our immediate response to meeting
the needs of people in our communities during
2023-24. Our most vulnerable citizens need a
service that is accessible and meets their 
immediate needs, as well as improving their
long-term economic outcomes. 
Whilst financial inclusion services are delivered
by a range of service providers across the 
sectors, this interim plan for 2023-24 will focus
on the main local authority and HSCP-funded
welfare rights and debt advice services 
North Ayrshire Financial Inclusion Strategy: Introduction
available to people in North Ayrshire. 
Over the next year, a full consultation process
will be undertaken with the public and key 
stakeholders, along with a detailed mapping
and analysis of local financial inclusion services
provision. 
Through this process, the strategy will be
reviewed and refreshed for 2024-28, and a
longer-term, cross-sector delivery plan put in
place encompassing wider financial inclusion
services. Our staff teams will be active 
participants in this process.
The Financial Inclusion Strategy is closely
aligned with North Ayrshire Council’s strategic
priority of ‘Aspiring Communities’, within which
North Ayrshire has:
Active and strong 
communities
Children and young people 
experience the best start in life
Inclusive, growing and enterprising 
local economy
People enjoy good life-long health 
and wellbeing
People and communities 
are safe
The vision of North Ayrshire Council is for a North Ayrshire that is ‘Fair for All’, with a 
mission of “working together to improve wellbeing, prosperity and equity in North Ayrshire.”
North Ayrshire Health and Social Care Partnership’s vision is that “people who live in 
North Ayrshire are able to have a safe, healthy and active life.”
Irvine
135

Page 136

North Ayrshire Financial Inclusion Strategy 2023-2028 4
Financial inclusion alignment with strategic ambitions to 2030
Tackle inequalities
The cost of living crisis has further highlighted
the negative impact of deprivation and poverty
on our communities, and we will continue to
work collaboratively with other service providers
to deliver shared solutions. 
We recognise those most vulnerable to the 
cost of living crisis are people living on low 
incomes, in particular lone-parent households
and people with disabilities and long-term
health conditions.   
We will build on our holistic approach to 
providing advice where income advisors and
frontline services are co-located to proactively
support those hardest to reach in our 
communities.
Improve health and wellbeing
We will continue to work with local 
communities to improve both physical health
and mental wellbeing. 
We recognise that in this cost of living crisis,
many people are experiencing anxiety, 
depression, or worrying about their finances. 
The free advice sector has an important role to
play in ensuring people have access to services
that will enable the maximising of disposable
income, offer options for managing debt and
support with managing money, whilst having
established referral pathways to health and
wellbeing services.
Provide early and effective support
Financial inclusion services will continue to
work with the most vulnerable in our 
communities, working to reduce the need for
financial crisis interventions. 
This requires a review of how financial inclusion
services are delivered across North Ayrshire 
to ensure everyone has ease - and equity - of 
access to advice and related services so they
can receive the right support at the right time
within their community.
Enable communities
understanding terminology, banking and 
broader money-related life skills, is an 
important element of financial inclusion 
services, forming the foundations for 
sustainable outcomes that will reduce the 
likelihood of clients facing financial crises in the
future.
Develop and support the workforce
North Ayrshire advice services have faced 
significant challenges over the last few years,
not least in responding to the Covid-19 
pandemic and ensuring continuity of 
service provision. 
They rose to that challenge and found new,
innovative ways to deliver services remotely
when that was the only option. Going forward,
we face new challenges with the cost of living
crisis and the changing and expanding 
demographic of people who are accessing
advice services. We recognise that many of our
citizens are also our own workforce or from our
delivery partners. 
We must ensure that advice services have 
the capacity and capability to meet demand 
and to effectively respond to the multiple 
needs of many clients. We must therefore 
ensure that we can effectively plan and build 
a cross-sector, collaborative advice service 
that meets the needs of North Ayrshire 
residents.  
Our shared vision:
“A financially healthy North Ayrshire where
people have the knowledge, skills, 
resources and confidence to manage their
money effectively and live fulfilling and
healthy lives.”
Our shared mission:
“The provision of easy to access, joined up,
quality advice services that work 
together and in partnership with related
services, to ensure that all the needs of 
our customers are met.”
Financial literacy support, which includes
136

Page 137

North Ayrshire Financial Inclusion Strategy 2023-2028 5
Our guiding principles 2023-24
We know we are already reaching many people across North Ayrshire, and that most - if not all -
have benefitted from our services to some extent, indeed many have expressed their gratitude, but
there remains scope to do even better.
• Deliver a professional, in-house advice service and work towards accreditation to the Scottish
National Standards for Information and Advice Providers, which will demonstrate high 
quality to both the public and funders. 
• Commission independent debt advice services, in recognition of 
the rights of people in our communities to be able to choose 
to access independent and impartial debt advice. 
• Reach out to people who are not using our services, 
particularly the most socially isolated, people living 
on the islands of Arran and Cumbrae, vulnerable 
families and those experiencing in-work poverty. 
• Work collaboratively across third and public sector 
advice agencies.
• Adopt a ‘named/key worker’ approach across advice 
agencies.  
• Be adaptable to meet clients’ priority issues and be flexible 
in delivery of person-centred advice.
• Pro-actively identify root causes and wider needs of clients, take action to support engagement
with other agencies as appropriate, and evidence outcomes from those actions.
• Improve referral pathways to advice services and build on our holistic approach to support for
those who need to access multiple services. 
• Develop systems and processes to standardise data recording and reporting and enable 
services to fully evidence outcomes for clients and achievements of services.
To achieve our intentions for 2023-24, we will:
Cumbrae
137

Page 138

North Ayrshire Financial Inclusion Strategy 2023-2028 6
What success will look like...
• Increase in local access points to advice services in our communities through building on our
outreach model, ensuring any identified gaps are prioritised and aligned to need.  
• Increased levels of engagement with advice services, in particular from:
• Reduced levels of repeat presentations to advice 
services, indicating that we are succeeding in breaking
cycles of debt and dependency.  
• Establish new and streamlined referral pathways to 
support the holistic approach together with partner 
organisations and agencies.   
• Performance management framework established, 
which will enable effective measurement of the 
difference our services are making for the people in 
North Ayrshire, including a single, person-centred record
for supports and an integrated dataset to support robust
performance reporting. 
• Increased number of people, particularly those considered ‘higher lending risk’, accessing
affordable loans and becoming regular savers through partnership with 1st Alliance Community
Bank.
• Establishment of a North Ayrshire cross-sector Financial Inclusion Partnership, with a refreshed
Financial Inclusion Strategy for 2024-28 agreed and published.  
• Reduced levels of poverty, and in particular child poverty, for the most vulnerable people and
families in our communities, to which financial inclusion services will have made a valued 
contribution. 
- Lone parents and other child poverty priority groups
- People with disabilities and long-term health conditions
- Residents in remote and rural locations, including the islands of Arran and Cumbrae
- People experiencing in-work poverty
- People from minority communities including gypsy/travellers
138

Page 139

North Ayrshire Financial Inclusion Strategy 2023-2028 7
1. What is financial inclusion
Financial inclusion can be described as the ability of individuals to access appropriate financial
services or products to manage their money effectively. 
This includes the ability to:
• Access welfare rights and money/debt advice from
free and professional services
• Manage their money effectively
• Build savings for unplanned expenditures
• Access affordable credit when required
• Sustain their home
• Buy insurances to safeguard their home and family
• Open a bank account
• Make informed life choices
• Be financially resilient
Financial exclusion is closely linked with poverty and
social exclusion and is a significant contributor to
child poverty.
Low-income households are most at risk from the cost of living crisis, and people with disabilities 
or long-term health conditions and lone-parent households are the most financially vulnerable. 
They are less likely to have savings that would cover their outgoings for more than a month should
they lose their job and are most likely to have unmanageable debt. 
Other particularly vulnerable groups include minority ethnic people (more likely to live in larger
households), gypsy/travellers (more likely to be in seasonal work) and refugees who face 
particular hardships. 
There is also a gendered dimension to the cost of living crisis. Women are more likely to
live in lone-parent households (92%), households with an unpaid carer and larger households, and 
can be more exposed to cost of living pressures. 
Financial inclusion services enable and empower people to access the information, advice and
support they need to maximise and effectively manage their disposable income, to be less likely
to fall behind with bills, more able to deal with unexpected expenses, have improved mental and
physical health and to become more active in their communities. Ultimately, they enable people
to have the knowledge, skills and confidence to feel more secure and in control of their personal
finances.
A financially healthy North Ayrshire is not only beneficial for individuals, but also for their families,
communities, businesses and the economy.
“Poverty means not being able to heat your home, pay your rent, or buy the essentials for
your children. It means waking up every day facing insecurity, uncertainty, and impossible
decisions about money. It means facing marginalisation – and even discrimination – 
because of your financial circumstances. The constant stress it causes can lead to problems
that deprive people of the chance to play a full part in society.”
(Joseph Rowntree Foundation)
139

Page 140

North Ayrshire Financial Inclusion Strategy 2023-2028 8
2. Economic context - national
The need for financial inclusion services has never been greater than in the current cost of living
crisis. 
The Joseph Rowntree Foundation report ‘UK Poverty 2023’ found that: “We are in the midst of a
profound cost of living crisis with huge implications for society. Many of us are having to make 
difficult choices on what spending we prioritise, but some of us face increasingly bleak choices.”
They found that in October/November 2022:
• Around six in ten low-income families are not able to afford an unexpected expense
• Over half are in arrears
• Around a quarter use credit to pay essential bills
• Over seven in ten families are going without essentials
• Around four in ten families with children are spending less on food for their children
The Joseph Rowntree Foundation also forecast that whilst inflation is expected to fall during 2023,
prices are expected to continue to rise along with rents and mortgage payments, and wages are
not expected to keep up. 
Scottish Government figures from 2019-20 showed that more than one in four of Scotland’s 
children are living in poverty. The Resolution Foundation forecasts that the rate of child poverty in
Scotland will be 29% by 2023-24 and Scottish Government projections indicate that, without 
significant change in national policy, the figure could reach 38% by 2030-31.
The Scottish Government’s 2022 publication ‘The Cost of Living Crisis
in Scotland: An Analytical Report’ found that low income households
with little or no savings are most impacted and also made reference to
the higher costs of living for people in rural and island 
households for some goods and services, including 
off-gas-grid fuel and transport.
While the most vulnerable members of our 
communities are continuing to access advice 
services in the largest numbers, there is 
evidence nationally, echoed by local advice
services, that there are more people seeking 
help now who were traditionally less likely to 
access advice services, eg homeowners and 
professional people. These groups represented 
higher proportions during the Covid-19 pandemic 
and have remained higher than pre-pandemic 
levels. 
Many people who sit just above the benefits 
entitlement threshold are facing financial 
difficulties. Increasing numbers of people who 
are in a debt solution (payment plan/debt 
arrangement scheme etc) are finding that they 
can no longer afford their contributions and more 
clients are presenting with complex debt.
The 2021-22 Common Advice Performance Management 
140

Page 141

North Ayrshire Financial Inclusion Strategy 2023-2028 9
Reporting Framework (CAPMRF) report for welfare rights and debt advice services funded by local
authorities across Scotland showed that there was a 24% increase in the number of debt clients
supported by services between 2020-21 and 2021-22.
3. Economic context – local
North Ayrshire is one of the most deprived areas in Scotland, with deprivation levels significantly
higher than the national average, and has the second highest level of child poverty - after housing
costs - of any area in Scotland. 
Child poverty statistics for 2019-20, released by Loughborough University, based on DWP and
HMRC data, shows that an estimated 6200 children aged 0-16 years were living in poverty in
North Ayrshire. 
North Ayrshire has the lowest employment rate in Scotland (64.9%), the second highest 
unemployment rate, and the economic inactivity rate (29.7%) is the highest in Scotland and the
13th highest in Great Britain.
The Scottish Government Local
Child Poverty Dashboard showed,
between 2018 and 2019, a 
significant drop in the number 
of people in North Ayrshire who
felt they were managing well 
financially, having gone down 
from 62% to 49%, whilst across
Scotland numbers remained 
fairly static.
In addition, since 2017, the 
statistics show an increasing
number of adults with no savings,
against a slight reduction across
Scotland.
Dalry
141

Page 142

North Ayrshire Financial Inclusion Strategy 2023-2028 10
The 2020 Scottish Index of Multiple Deprivation (SIMD) shows that of the 186 SIMD data-zones
in North Ayrshire, 74 fall within the most deprived areas in Scotland (quintile 1). This represents
39.8% of all datazones in North Ayrshire, with 41.2% of the population living in those areas.
The Three Towns has the highest proportion of datazones in quintile 1 (56.8%), as illustrated in the
chart below.
North Ayrshire Council’s ambition is for a North Ayrshire ‘where everyone has the same life 
chances to grow, prosper and have fulfilling and healthy lives’. 
Financial inclusion services have an important role in ensuring that North Ayrshire Council
achieves that ambition.
Ardrossan
142

Page 143

North Ayrshire Financial Inclusion Strategy 2023-2028 11
4. The role of financial inclusion services in tackling poverty
Direct drivers of poverty
The direct drivers of poverty fall into three main categories – income from employment, costs of
living and income from social security.   
Therefore, advice services and the wider financial inclusion sector have a key role in tackling 
poverty.
• Income from employment
North Ayrshire has the lowest employment rate in Scotland 
(64.9%) and the second highest unemployment rate (5%). 
Economic inactivity is the highest in Scotland. 
Embedding advice services within employability services 
enables their service users and clients to have direct access 
to advice services, which will address financial barriers to
employment and enable progression in employment through 
increasing hours of work/hourly pay and thereby increase 
household income.
• The ‘take-up’ of social security entitlements
Unclaimed benefits across Britain were estimated to be around £20 billion in 2016-17. Only one in
five were estimated to have claimed means-tested benefits and less than one third claims Working
Tax Credit for households with no children. 
Welfare rights advice enables people to better understand and claim their entitlements to 
maximise their income. Increasing benefits take-up and ensuring citizens are in receipt 
of income that they are due has a positive impact for North Ayrshire residents and the 
local economy.
143

Page 144

North Ayrshire Financial Inclusion Strategy 2023-2028 12
As a result of low incomes, and/or lack of credit 
history, many people are unable to borrow 
money from the same sources as other 
members of the population.
Many, as a result, turn to high-cost 
alternatives such as doorstep or 
payday lenders. Credit can therefore 
be the most expensive for those 
who can least afford it. 
Access to affordable credit and 
savings can protect against 
problem debt and material 
deprivation as they safeguard 
against unplanned costs and
changes in income. 
Credit Unions/Community Banks 
are key providers of financial inclusion 
services and will also be represented 
on the Financial Inclusion Partnership 
to be established in 2023.
• Costs of living
It is estimated that around 62% of Scottish households are now living in fuel poverty (paying more
than 10% of their income on energy). This figure rises to 80% for low-income households. Another
significant change is that almost half of all ‘non-income’ poor are now also likely to be fuel poor, up
from 9.5% in 2019-20.
Referral pathways are in place from advice services to specialist fuel poverty/energy advice 
services to ensure that people get help with, for example, debts to utility providers. Interventions
include support to access discretionary grants to write off energy debts, or to set up repayment
plans. They also provide advice and support in resolving disputes with suppliers and with the 
replacement of prepayment meters with credit meters. 
Local providers will be represented on the Financial Inclusion Partnership to be established in
2023.
• Unmanageable debt
Debt repayments are not deducted from income for the purposes of determining whether a 
household is in income poverty. 
They do, however, reduce the amount of disposable income that households have to spend on
goods and services, and therefore increase their risk of material deprivation, ie unable to afford
goods and activities that are the norm in today’s society. 
Debt advice services offer options for managing debt more effectively, and part of the strategy for
2023-24 is to provide a universal debt advice service that will provide independent, impartial and
accessible advice to all citizens in North Ayrshire.
• Access to affordable credit and savings
144

Page 145

North Ayrshire Financial Inclusion Strategy 2023-2028 13
The Common Advice Performance Management Reporting Framework (CAPMRF) 2021-22 report
(produced by the Improvement Service on behalf of Scottish Government) shows a national trend
of declining welfare rights activity over the last two years, with fewer claims, mandatory 
reconsiderations and appeals supported in comparison with previous years. 
However, they also report that one contributory factor may be the increasing number of complex
welfare rights cases, which will impact on capacity. The complex nature of cases is reflected in the
average time spent with a client/resolving their issue, which went up from 3.25 hours in 2020-21 to
5.35 hours in 2021-22. 
Conversely, national trends relating to debt advice show that the number of people supported
increased by 24% between 2020-21 and 2021-22, which may be due in part to the removal of
Covid-19 support measures. “Those who were struggling during the pandemic may have reached
crisis point once creditors resumed collections.” 
The Common Advice Performance Management Reporting Framework also found that the most
common type of debts presented, both nationally and locally, are “Council Tax arrears, rent arrears
and utility arrears, suggesting clients are more frequently struggling with essentials. It is possible
this trend will continue as the effects of the cost of living crisis unfold”. 
In North Ayrshire, overall, demand for debt advice services is increasing, but unlike the national
picture, demand for welfare rights advice is also increasing.
The report concluded that:
“The findings of this report demonstrate the significant impact that local authority 
[funded] money and welfare rights advice services continue to make. These services have
played a vital role through the instability experienced in the early 2020s and have 
supported increasing numbers of vulnerable households in the past year. Services are
likely to experience continued pressure in the following years. Demand from debt advice
clients has already increased in the most recent year and rising costs mean there is likely to
be increased demand from those struggling to make ends meet.”
5. North Ayrshire financial inclusion services - current 
position
In comparison with many other local authorities, North Ayrshire has relatively few local providers
of advice and wider financial inclusion services, but they are well-established in local 
communities. See Appendix 1 for locality maps illustrating access points across North Ayrshire.
The main advice agencies/services are:
Money Matters
With a North Ayrshire Health and Social Care Partnership investment of £1.4m, Money Matters
provides a universal welfare rights advice service across North Ayrshire, supporting residents to
ensure they receive their legal entitlement to benefits. 
The team also undertakes financial assessments for non-residential social care services where
charges apply and support social care service users to maximise benefits, for example supporting
Kinship Carers to claim all benefits they are entitled to. It also provides free training to colleagues
across public and voluntary sectors working in front-facing roles.
145

Page 146

North Ayrshire Financial Inclusion Strategy 2023-2028 14
In 2021-22, the service received 4,958 initial contacts (including 526 financial assessments for
non-residential charging). Of those, 1,672, or 34% of initial contacts, were from vulnerable families
and 55% had a disability or long-term health condition. The Money Matters team secured over
£17.5m in verified financial gains for their clients, more than double the financial gains achieved in
2017-18. 
28%
12%
14%
34%
10% 2%
MONEY MATTERS REFERRALS
Three Towns Kilwinning Garnock Valley
Irvine area North Coast Arran
Money Matters can be accessed across North Ayrshire through its dedicated advice line, face to
face in social services local offices and is co-located with frontline services including criminal 
justice, addictions, mental health, children’s throughcare services and the learning disabilities
team. The team also has an adviser based within the foodbanks, and since June 2022 has 
provided welfare rights advice in nine GP practices - with plans to expand this to Arran and Millport
during 2023 - and in seven schools since Autumn 2021.
Client feedback:
“Thank you for helping us both claim Attendance Allowance… now we can pay for many
tasks to be done for us which we no longer can do. Well done!”
Housing Services Welfare Reform and Advice Team
Funded by the Housing Revenue Account (£0.6m investment), the Housing Services Welfare 
Reform and Advice Team provides welfare rights and debt advice services for Council tenants. 
In 2021-22, 1,528 individuals were referred, or self-referred, with 68% of referrals from housing
0
2
4
6
8
10
12
14
16
18
20
2017/18 2018/19 2019/20 2020/21 2021/22
£ Millions
Money Ma�ers Verified Financial Gains
146

Page 147

North Ayrshire Financial Inclusion Strategy 2023-2028 15
services and 25% self-referrals. Over the last three years, the team has received a significant 
increase in referrals for debt advice and this trend has continued into 2022-23. In 2020-21 the
team achieved £2.2m in financial gains for Council tenants. 
Advisers from the Welfare Reform and Advice team are based in housing offices across North 
Ayrshire. A breakdown of referrals received from the housing offices (below) shows that the 
service is reaching tenants across North Ayrshire.
Client feedback:
“Thank you so much for 
helping me today and every 
other time in connection with
this. For the first time in a long
time, I might be able to sleep
properly without nightmares
and fear keeping me awake.
Once again, thank you.”
CHAP
Based in Ardrossan, CHAP is a well-established charitable organisation that provides welfare
rights, money/debt and independent housing advice for people across North Ayrshire. In 2023, it
will also be delivering a new financial literacy programme, funded through the Council’s Shared
Prosperity Fund ‘Multiply’ programme. 
Over the last five years, CHAP has been the key delivery partner for the Better Off North Ayrshire
advice service projects, and as with public sector advice services the organisation is seeing 
increasing referrals for both debt and welfare rights advice. In addition, between 2021 and 2022,
33% more clients were identified as having debts to energy companies (referred on for specialist
advice).
Note: AHAP (Ayrshire Homelessness & Prevention) is a partnership between CHAP and the Govan Law Centre through which 
homeowners can access advice and support when facing threat of repossession.
24%
18%
37%
11%
10%
Local Housing Office referrals
3 Towns Garnock  Valley Irvine Kilwinning Largs
30%
21%
28%
11%
10%
CHAP Referrals by locality
Irvine Kilwinning Three Towns (incl Arran) Garnock Valley North Coast
0
50
100
150
200
250
300
350
400
Welfare Fights Housing Debt AHAP
CHAP Referrals (excluding Be�er Off)
2021 2022
Client feedback:
“Staff always phone to check up. Members of staff really nice. Can’t complain about 
anything, service was outstanding. I know I can call whenever I need any assistance in 
the future.”
147

Page 148

North Ayrshire Financial Inclusion Strategy 2023-2028 16
1st Alliance Community Bank
1st Alliance Community Bank covers the West of Scotland and is based in Kilwinning. It is a 
not-for-profit cooperative that offers tailored financial solutions for its members.   
In August 2021, North Ayrshire Council put in place a Service Level Agreement through which it 
invested £150k for the express purpose of enabling 1st Alliance to lend to those who are ‘higher
risk’ due to past history, but who can afford repayments. This fund is being ‘recycled’ as each loan
is cleared off, thereby providing a legacy funding which will enable 1st Alliance to continue 
providing low-cost loans to ‘high risk’ customers over a number of years. 
In December 2022, it was agreed that the Service Level Agreement would be amended to enable
the fund to also be utilised to encourage individuals/families to become more financial resilient by
providing an incentive to start saving in the form of a one-off £25 payment, which is allocated to a
new savings account. To date, ‘higher risk’ loans have been awarded to 165 people, 45% of whom
were unemployed.
Client feedback:
“1st Alliance have been amazing. I really didn’t know where to turn to after I had a flood in
my house. I had no insurance and my credit isn’t the best. A friend told me about 1st Alliance
and the whole loan process was so straightforward.”
Better Off North Ayrshire
Over the last five years, North Ayrshire Council has contracted out universal debt advice services
to the third sector, initially through external funding. In October 2020, through learning from earlier
programmes, North Ayrshire Council funded a pilot advice service (incorporating welfare rights,
debt and housing advice) to be delivered through a Public Social Partnership, with annual funding
of £0.2m. 
The pilot was delivered within the Three Towns locality of Ardrossan, Saltcoats and Stevenston. It
commenced in March 2021 and will come to an end in June 2023. A key worker/whole 
person approach was incorporated into a collaborative delivery model with online referral pathways
established to/from third and public sector advice agencies, as well as Community Link Workers
(attached to GP surgeries) and employability services.
In 2022, 306 Three Towns residents
were referred, or self-referred, to the
Better Off pilot advice service. There
were a further 67 ‘drop-ins’ who
accessed immediate welfare rights
help and support. 75% of those
referred had a disability or long-term
health condition, and 23% were from
child poverty priority groups. 
A total of 449 services were 
accessed by those referred, 
including 48 individuals who were
referred on for health and wellbeing
needs and 15 to employability 
services.
0
50
100
150
200
250
Welfare
Rights
Debt Advice Housing
Advice
Fuel Poverty Health and
Wellbeing
Employability
Be�er Off 3 Towns -no of clients who accessed
each service
148

Page 149

North Ayrshire Financial Inclusion Strategy 2023-2028 17
The project has worked closely with Money Matters and the Welfare Reform and Advice Team, as
well as external partners. The pilot was designed to focus on those with complex and significant
challenges.
The outcomes-focused approach of evaluating Better Off was evidenced in a Year One Social
Impact Report produced by the Social Value Lab. Of those interviewed through the consultation, it
was found that 74% had an improved financial situation and 82% had reduced stress and anxiety.
In addition, of the clients interviewed:
66%
Improved rela�onships & social
networks
94%
Increased skills &
knowledge
94%
Increased skills &
knowledge
These outcomes are an indication that the improved financial circumstances experienced are more
likely to be sustained and that the beneficiaries of the services are less likely to have a financial
crisis situation in the future.
The external evaluation of year one of the Better Off pilot highlights the financial and social 
benefits that services provided in a joined-up way can bring to people’s lives. The single point of
contact to access multiple services, benefits, budgeting, debt, employability, energy, digital, health
and wellbeing and housing, supported by a keyworker, provides a holistic approach, and the 
principles of the Better Off pilot will be encompassed in the new approach moving forward.
Client feedback:
“This has made a huge difference to my life. If [Better Off] hadn’t helped me I would have
just went under.”
Conclusion
It is clear that North Ayrshire has a number of financial inclusion services that are 
well-established in local communities and are accessed by residents across North Ayrshire, 
delivering significant financial gains and supporting the cost of living and poverty crisis in North
Ayrshire. However, many of these teams and services are not delivered in a joined-up way 
considering the needs of our citizens first. Many of the teams deliver the same services and it is
considered that by bringing them closer together, there is scope to streamline referral pathways
into the services, to make services more accessible for our citizens and to reduce the number of
cross-referrals between teams.   
This should create a more integrated system and support people in a more holistic way.  
Caseloads for all teams and services are increasing and North Ayrshire Council and the HSCP
need to maximise all resource and capacity available to support our communities.
97%
Improved confidence &
resilience
149

Page 150

North Ayrshire Financial Inclusion Strategy 2023-2028 18
6. North Ayrshire financial inclusion services - moving forward
Our immediate intentions for 2023-24
To support North Ayrshire Council and the HSCP’s strategic priorities, our immediate plans for
2023-24 are to:
Review, develop and improve North Ayrshire advice services to ensure they are 
person-centred, responsive and meet the needs of all North Ayrshire residents, and 
particularly the more vulnerable groups of people. To achieve this we will:
• Create a single advice service team by merging Housing 
Services Welfare Reform and Advice Team and Money 
Matters.
• Start to work towards achieving the Scottish 
National Standards for Information and Advice 
Providers (SNSIAP) for welfare rights advice to
Type 111.
• Develop a new, integrated framework for 
measuring customer satisfaction and to obtain 
feedback and suggestions from customers.
• Review and develop the in-house delivery model 
to build on the holistic approach to pro-actively 
identifying underlying and associated issues and 
support engagement with other service providers 
as appropriate to individual needs.
• Ensure accessibility of support, building on the outreach 
and co-location model of delivering supports.
• Review and develop the Performance Management framework to 
support a standardised approach to data capture and reporting of outcomes, 
a systematic approach to service development, and to encourage a culture of continuous 
improvement.
• Identify and implement a new case management system that incorporates the quality 
assurance and performance management frameworks.
Establish effective partnership working practices that will enable a more joined-up approach to
service delivery and development, which also maximise resources and available funding. To 
support this, we will:
• Establish seamless referral pathways to and between advice and key referral agencies, 
including community banking, financial literacy, housing, health, employability and 
social services.
• Develop and establish a closer working partnership with 1st Alliance Community Bank.
Provide an independent debt advice service to all residents in North Ayrshire. To support this,
we will:
• Provide a service that will be available to owner occupiers, private rental sector tenants, 
Housing Association and North Ayrshire Council tenants.
• Develop a service specification that incorporates the key elements of the Better Off model,
including the holistic approach, with a performance management framework to measure the
impact of support.
• Commission through the Third Sector a universal debt advice service to provide independent,
impartial and accessible debt advice services for a two-year period initially.
150

Page 151

North Ayrshire Financial Inclusion Strategy 2023-2028 19
Improve access to, and awareness of, advice services across North Ayrshire. To achieve this we
will:
• Develop and implement a communications plan targeting the more vulnerable groups of 
people, to promote advice and wider financial inclusion services and maximise awareness of
access points.
• Develop an interactive online mapping tool that will enable ease of access to information about
what advice services are available where, and when, in local communities.
• Investigate options to develop an App or a platform that provides information about local advice
services, access to appropriate self-help tools and the option to submit a request for a follow-up
call from advice services. 
• Embed welfare rights provision within employability services.
Review and refresh the Financial Inclusion Strategy for 2024-28
To achieve this we will:
• Encourage and support participation of staff teams in reviewing the vision and mission 
statements, agreeing our core values and the development of our ambitions for the next four
years.
• Consult with key stakeholders and North Ayrshire residents.
• Put in place a robust performance management framework across services to ensure we can
quantify and measure the totality of difference our services are making to the people of North
Ayrshire.
• Undertake a mapping of all financial inclusion services and access points across North 
Ayrshire.
• Officially launch our North Ayrshire Financial Inclusion Partnership.
• Agree and publish a refreshed Financial Inclusion Strategy for 2024-28.
Develop and establish a cross-sector North Ayrshire Financial Inclusion Partnership, with 
representation from financial inclusion service providers and key stakeholders, which will:
• Include representation from, for example, advice services, 1st Alliance Community Bank, fuel
poverty advice services, employability, education and housing services, housing associations,
community link workers, the food bank and the Alcohol and Drugs Partnership. 
• Support the development, monitoring and evaluation of service developments, including 
referral pathways, and allow our citizens to more easily access information on the wide array of
supports available. 
• Enable a joint approach, making the best use of all available resources, to mitigating the impact
of the cost of living crisis on individuals, families and communities in relation to entitlements,
managing money, debt, financial literacy, digital inclusion, affordable lending, fuel poverty,
health and more. 
• Foster collaborations and the development of shared proposals to address identified gaps, as
well as the development of funding proposals and opportunities. 
• Enable the sharing of information, knowledge and expertise to support activities including:
-  Understanding and awareness, across the partnership, of the services offered by all providers
and of the key needs of, and challenges faced by, their client groups.
-  Future developments, including the mapping of advice and wider financial inclusion services
across North Ayrshire and identification of gaps in service provision.
• Provide access to a wider group of frontline workers and service users, which will help inform
and support developments including the communications plan and consultations that will inform
the strategy refresh. 
• Support the monitoring and evaluation of service developments.
• Support the development of key themes and strategic objectives for the refresh of the strategy
for 2024-28.
151

Page 152

North Ayrshire Financial Inclusion Strategy 2023-2028 20
Appendix 1: Advice service access points in North Ayrshire
North Coast
1. Housing Services 
Welfare Reform and
Advice Team: 
Largs Area Office
31 Brisbane Road
Largs
KA30 8LH
2. Money Matters:  
Largs Academy
Alexander Avenue
Largs
KA30 9DR
Largs
152

Page 153

North Ayrshire Financial Inclusion Strategy 2023-2028 21
Garnock Valley
3. Housing Services Welfare
Reform and Advice Team:
Kilbirnie Area Office
Craigton Road
Kilbirnie
KA25 6LJ
Kilwinning
4. Money Matters: 
Garnock Community Campus
Beith Road
Glengarnock
KA14 3BJ
5. Housing Services Welfare
Reform and Advice Team: 
Dalry/Beith Area Office
Sharon Street
Dalry
KA24 5DR
6. Money Matters: 
Dalry Medical Practice
50 Vennel Street
Dalry
KA24 4AF
7. Money Matters:
Kilwinning Academy
Dalry Road
Kilwinning
KA13 7HD
8. Housing Services
Welfare Reform and
Advice Team: 
Kilwinning Area Office
35 Main Street
KA13 6AN
9. Money Matters
Kilwinning Medical
Practice
15 Almswall Road
Kilwinning
KA13 6BL
10. Other Advice
Services
Kilwinning Sports Club
Pennyburn Road
Kilwinning
KA13 6LF
23. 1st Alliance 
Community Bank
147 Main Street
Kilwinning
KA13 6EQ
153

Page 154

North Ayrshire Financial Inclusion Strategy 2023-2028 22
Three Towns
10. Money Matters: 
South Beach Medical Practice
8 Harbour Street
Ardrossan
KA22 8BS
11. Money Matters: 
St Matthew’s Academy
Jack’s Road
Saltcoats
KA21 5NT
12. Money Matters: 
Saltcoats Medical Practice
17-19 Raise Street
Saltcoats
KA21 5LX
13. Housing Services 
Welfare Reform and 
Advice Team: 
Saltcoats Town Hall
Countess Street
KA21 5HP
14. Money Matters: 
Lockhart Campus
120 Boglemart Street
Stevenston
KA20 3JL
15. Money Matters: 
Ayrshire Medical Group
20 Main Street
Stevenston
KA20 3AB
22. CHAP
71 Princes Street
Ardrossan
KA22 8DG
Irvine
16. Money Matters: 
Eglinton Medical Practice
Ayrshire Central Hospital
Kilwinning Road
KA12 8SS
17. Money Matters: 
Irvine Royal Academy
Kilwinning Road
Irvine
KA12 8SJ
18. Money Matters: 
Frew Terrace Surgery
9 Frew Terrace
Irvine
KA12 9DY
19. Housing Services 
Welfare Reform and 
Advice Team:
Irvine Area Office
Bridgegate House
KA12 8BD
20. Money Matters: 
Townhead Medical Practice
6-8 High Street
Irvine
KA12 0AY
21. Money Matters
KA Campus Greenwood Academy
Corsehill Mount Road
Dreghorn
KA11 4HL
154

Page 155

North Ayrshire Financial Inclusion Strategy 2023-2028 23
Appendix 2: Strategic links and references
Caring Together: NAHSCP Strategic Commissioning Plan 2022-2030
Child Poverty Report 2021-22 and Action Plan 2022-23 (north-ayrshire.gov.uk)
North Ayrshire Council Plan 2019 (north-ayrshire.gov.uk)
Strategic links
References
How is the cost crisis affecting equality and fairness in Scotland? - Emergency Budget Review:
equality and fairness - evidence summary - gov.scot (www.gov.scot)
What is poverty? | JRF
Wrong direction: can Scotland hit its child poverty targets? • Resolution Foundation Chapter 1.
Introduction - Tackling child poverty delivery plan: forecasting child poverty in Scotland - gov.scot
(www.gov.scot)
UK Poverty 2023: The essential guide to understanding poverty in the UK | JRF
The Cost of Living Crisis in Scotland: analytical report - gov.scot (www.gov.scot)
Cost of Living Report - December 2022 | Money Advice Scotland
Child Poverty Report 2021-22 and Action Plan 2022-23 (north-ayrshire.gov.uk)
Local child poverty dashboard - gov.scot (www.gov.scot)
Drivers of child poverty - Tackling child poverty - fourth year progress report 2021 to 2022: annex
A - measurement framework - gov.scot (www.gov.scot)
SCoRSS benefits take-up final.pdf (cpag.org.uk)
Fuel poverty: estimates for the UK | CPAG
2021-22 Report | Improvement Service
Eglinton Park
155

Page 156

North Ayrshire Financial Inclusion Strategy 2023-2028 24
Appendix 3: North Ayrshire financial inclusion services
CHAP
71 Princes Street
Ardrossan
KA22 8DG
To access advice and support:
Call: 0300 002 0002
Email: enquiries@chap.org.uk
Or use the online contact form at: CHAP | 
Ayrshire Charity supporting housing, welfare and
debt issues
Money Matters
Bridgegate House
Irvine 
KA12 8BD
To access advice and support:
Call: 01294 310456
Email: moneymatters@north-ayrshire.gov.uk
Or use the online contact form at: Money 
Matters - North Ayrshire Health & Social Care
Partnership (nahscp.org)
Housing Services 
Welfare Reform 
and Advice Team
To access advice and support:
Call: 0300 999 4606
Email: welfarereformteam@north-ayrshire.gov.uk
Web: Welfare advice for council tenants 
(north-ayrshire.gov.uk)
1st Alliance 
Community Bank
147 Main Street
Kilwinning
KA13 6EQ
Call: 01284 557123
Email: info@allianceayrshire.co.uk
Or use the online contact form at: 1st Alliance
Community Bank (allianceayrshire.co.uk)
156

Page 157

North Ayrshire Financial Inclusion Strategy 2023-2028 25
Appendix 4: Drivers of poverty flowchart (alternative text)
Driver – Income from employment
Driver – Costs of living
Driver – Income from social security and benefits in kind
The Scottish Government has identified three key drivers of poverty in Scotland and the key 
indicators relating to them. They are:
Indicators:
• Hourly pay
• Hours worked
• Skills and qualifications
• Labour market
• Availability of affordable and accessible transport and childcare
Indicators:
• Housing costs
• Other costs of living
• Debts
• Enablers including access to affordable credit, internet access, savings and assets
Indicators:
• Generosity of benefits
• Reach of benefits
• Eligibility criteria
• Take-up
Irvine
157

Page 158

North Ayrshire Financial Inclusion Strategy 2023-2028 26
Any questions about this document, 
including requests for supporting documentation 
or information, should be directed to:
If you have any comments that you would like to share 
with us, please get in touch by emailing 
whatmatterstoyou@north-ayrshire.gov.uk
North Ayrshire Health and Social Care Partnership
Cunninghame House
Friars Croft
Irvine 
KA12 8EE
158

Page 159

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Islands Emergency Cost Crisis Fund 
Purpose:  To seek Cabinet approval for the allocation of the Scottish
Government Islands Emergency Cost Crisis Fund. 
Recommendation:  That Cabinet approves the proposed distribution of the Islands
Emergency Cost Crisis Fund. 
1. Executive Summary 
1.1 The Island Cost Crisis Emergency Fund provided, from December 2022, an additional
£1.4 million investment (£1.1 million resource and £300k capital) throughout the
remaining 2022-23 financial year to specifically recognise and tackle the challenges
faced by island communities. 
1.2 This fund is being directly allocated to Local Authorities, through a 100% population
formula as approved by the COSLA Settlement Distribution Group and COSLA Leaders. 
1.3 The fund was allocated to local authorities for use in financial year 2022-23 in December
2022. This report outlines the criteria for the fund and the proposed arrangements for
the North Ayrshire allocation. 
2. Background 
2.1 The Islands (Scotland) Act 2018 (“the 2018 Act”) introduced measures to underpin the
Scottish Government’s objective to meet the needs of island communities.  Section 3
of the 2018 Act places a duty on Scottish Ministers to prepare a National Islands Plan
(NIP). 
2.2 The National Islands Plan (NIP) is a Scottish Government plan and sets out sets out
how the quality of life will be improved for island communities, across Scotland’s 93
inhabited islands, through a collective responsibility to deliver its 13 Strategic Objectives
and associated commitments. 
2.3 Throughout 2022 high rates of inflation have contributed to a cost crisis, which follows
on from the Covid-19 pandemic, Brexit and a period of prolonged austerity. Islands
already experience higher costs of living. High fuel costs, a colder climate and the lack
of consumer choice is further intensifying the impact of the cost crisis. 
Agenda Item 10
159

Page 160

The Island Cost Crisis Emergency Fund 
2.3 Whilst island communities can access a wide range of existing funding from the Scottish
Government, the Island Cost Crisis Emergency Fund represents an additional £1.4
million investment (£1.1 million resource and £300k capital) throughout the remaining
2022-23 financial year. This has been developed to specifically recognise and tackle
the challenges faced by island communities. 
2.4 This fund is being directly allocated to Local Authorities, through a 100% population
formula as approved by the COSLA Settlement Distribution Group and COSLA
Leaders.  Allocations for are as North Ayrshire Council follows: 
Local Authority  Resource (£000) Capital (£000)
North Ayrshire Council 63 17 
2.5 Local Authority decisions on where funding will be directed should be based on their
local knowledge and understanding of the impacts of the cost crisis in their area. Local
authorities have discretion to identify and support those most vulnerable and in need. 
2.6 The targets/milestones against which progress in achieving objectives/expected
outcomes shall be monitored are completion of the monitoring template by 31 March
2023. 
2.7 Local Authorities responsible for islands should: 
● Use this funding to target island areas only; and 
● Use the funding to target immediate need and help those who are struggling due to
the cost crisis; and
● Use the funding for existing schemes and/or other new support where they feel the
need is greatest. 
2.8 Given the flexibility around this funding, Scottish Government expects the
administrative cost to local authorities to be minimal. 
Proposed Allocation in North Ayrshire 
2.9 The proposed allocation in North Ayrshire is based on the criteria at 2.7 above. There
are already arrangements in place for energy efficiency, energy crisis support and
welfare rights advice for residents and it is proposed to use existing mechanisms to
provide targeted support for islands communities. Schools have quickly identified
potential areas of spend which will mitigate cost of living challenges which particularly
affect island communities. Mini-enquiries on child poverty and the cost of living have
recently been held on Arran and Cumbrae and key themes and potential mitigations
have been identified. It is proposed that local third and voluntary sector organisations
will be funded to address locally identified challenges. Therefore, the following
arrangements are proposed: 
160

Page 161

Table 1
Purpose Funding allocation 
EnergySmart (existing service which supports energy efficiency
measures in homes and crisis grants). In addition, £5,000 will
also be contributed from Covid Recovery funding for this service.       
£10,000
Money Matters (existing service which supports Welfare Rights
assistance/representation to North Ayrshire residents to ensure
they receive their legal entitlement to state benefits). In addition,
£5,000 will also be contributed from Covid Recovery funding for
this service.
£10,000
Schools (Arran High, Arran primary schools, Largs Academy
and Cumbrae Primary School) 
Proposed purposes include:
• Remote, online after school study support for islands pupils
who are unable to attend in person due to costs and
availability of transport;
• The introduction of laundry and other family support
initiatives in schools; and
• The introduction of visiting specialists to broaden the
experience of children due the unavailability or
unaffordability of transport for visits to mainland facilities
and experiences. 
£15,000 (total)
Third and voluntary sector groups on Arran and Cumbrae 
Two mini-enquiries have been held on Arran and Cumbrae to
identify key island challenges in relation to the cost of living
crisis. Key themes have been identified, with potential
mitigations which can be delivered locally, over and above the
proposed support (above) for energy and welfare rights advice.
Due to the timing of the award of the funding to councils, it is
proposed that Arran CVS (in its role as a partner organisation in
the Third Sector Interface) supports the identification of relevant
delivery groups in the third and voluntary sector and supports
the Council to award the funding in conjunction with the chairs
of the North Coast and Cumbraes and Arran Locality
Partnerships and Council officers, with the awards being
reported to the Locality Partnerships and Scottish Government.
Connected Communities will contribute £2,000 to the fund to
provide a total allocation of £30,000 across the two islands.
£28,000 
2.10 £17,000 capital has been allocated to North Ayrshire. The disbursement is being
discussed with Scottish Government due to the short timescale for spend. It is
anticipated that this will facilitate the purchase of items of equipment for community
organisations. The outcome will be reported to the Locality Partnerships.   
2.11 Discussion has taken place with Scottish Government and these proposals have been
approved in principle.
161

Page 162

3. Proposals 
3.1 It is proposed that Cabinet approves the proposed distribution of the Islands Emergency
Cost Crisis Fund. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The proposed funding allocations are fully funded by the Scottish Government Islands
Emergency Cost Crisis Fund. 
Human Resources 
4.2 None. 
Legal 
4.3 The National Islands Plan (NIP) is a Scottish Government plan and sets out sets out
how the quality of life will be improved for island communities, across Scotland’s 93
inhabited islands, through a collective responsibility to deliver its 13 Strategic Objectives
and associated commitments. 
Equality/Socio-economic 
4.4 The Scottish Government Islands Emergency Cost Crisis Fund has been introduced to
specifically recognise and tackle the challenges faced by island communities. 
Climate Change and Carbon 
4.5 The proposals include an allocation to the EnergySmart scheme which focuses on
energy efficiency. 
Key Priorities 
4.6 The following Council key priorities will be progressed by these proposals: 
• North Ayrshire’s children and young people have the best start in life
• North Ayrshire’s residents and communities are safe
• North Ayrshire’s residents and communities enjoy good life-long health and well-being
• North Ayrshire is a sustainable environment. 
Community Wealth Building 
4.7 Funding awarded through the Scottish Government Islands Emergency Cost Crisis
Fund will be allocated to local organisations, giving them financial power to support their
own communities. 
162

Page 163

5. Consultation 
5.1 Consultation has taken place with chairs of the North Coast and Cumbraes and the
Arran Locality Partnership, the communities of Arran and Cumbrae through the Cost of
Living mini-enquiries, the Third Sector Interface partners and Scottish Government.
Progress will be reported to the relevant Locality Partnerships. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Audrey Sutton, Executive Director (Communities &
Education), on (01294) 324414. 
Background Papers
0
163

Page 164

164

Page 165

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Community Asset Transfer of the Toilet Block and adjacent
land at Ardrossan South Beach. 
Purpose:  To provide an update to Cabinet on progress relating to the
Community Asset Transfer of the toilet block and adjacent land
at Ardrossan South Beach; and 
Seek approval for the revised rent for the asset being transferred
to Ardrossan Community Development Trust. 
Recommendation:  That Cabinet: 
a) Notes the ongoing progress of the Community Asset
Transfer assessment process.
b) Agrees a revised rent of £600 per annum (10% of the
current valuation of £6,000 pa). 
1. Executive Summary 
1.1 At a meeting on 24 January 2023, Cabinet agreed in principle to a lease, under the
Community Asset Transfer (CAT) process, of the existing toilet block and adjacent land
at Ardrossan South Beach, South Crescent Road, Ardrossan between Ardrossan
Community Development Trust and North Ayrshire Council. 
1.2 The lease to Ardrossan Community Development Trust (ACDT) would allow the area to
be developed in order to enhance local facilities including the delivery of the Ardrossan
Promenade project funded under the Scottish Government’s Regeneration Capital
Grant Fund (RCGF). 
1.3 There was a requirement to confirm Cabinet’s agreement in principle for the asset
transfer in the January 2023 Cabinet in order to access Lottery funding which has been
previously allocated for Ardrossan. 
1.4 Officers were authorised to progress the CAT assessment process with any outstanding
issues brought back to Cabinet for decision. 
Agenda Item 11
165

Page 166

2. Background 
2.1 Since approval in principle by Cabinet, the CAT process has progressed, with the
following further information being provided: 
• Submission of outstanding paperwork from ACDT
• Satisfactory Locality Officers assessment of the full application where the application
received a Medium score.
• Satisfactory assessment by Legal in relation to ACDT governance documents
• Satisfactory assessment by Finance and Business Team where it received a Medium
score.
• Agreement developed with Streetscene in relation to the ongoing care and
maintenance of the site has been included in the lease.
• Completion of the full statutory public consultation where no comments were
submitted. 
2.2 Since January, there has been substantial negotiation between North Ayrshire Council
and lawyers representing ACDT regarding the lease. Mutually agreeable proposed
amendments have been made through ongoing discussions between all parties. 
2.3  A Business Plan pertaining to the applicant and the asset requested is required as part
of the CAT process and should be submitted with the initial application.  Information
from the business plan is used to ascertain an appropriate level of discount to the
valuation of the asset. 
2.4   In the case of ACDT, the Business Plan was submitted on 2 March 2023. As this was
not available prior to the Cabinet meeting of 24 January 2023, no discount could be
advised at that time. Based on the information now available, it is recommended that a
rent of £600 per annum be applied to this CAT – 10% of the current valuation. This
takes account of the condition of the existing facility, investment to date and the potential
social return on investment. 
The community asset transfer process will not transfer from the Council. Leasing 
under the community asset transfer process permits the Council to exercise its rights
under the Community Empowerment (Scotland) Act 2015 to evaluate its Best Value
duty in terms of social value, rather than monetary best value. Granting a lease in this
way means that the community organisation is not charged commercial rates, as the
Council recognises that the greater opportunity is for the community to benefit from local
community operational management. This CAT will facilitate the development of range
of events and activities within the enhanced area, encouraging a wider range of people
to get involved, giving opportunities for local volunteering and stimulating involvement
in shaping and regenerating community life, building self-esteem and confidence. In
addition, the creation of the beach huts will support local business enterprise, with
profits being used to sustain ACDT’s projects.   
2.5   The Business Plan sets out the opportunities for ACDT to generate income, where
external funding has been secured and where potential funding may be leveraged from.
This includes the income from the travelling fairground, a key feature in the local events
calendar. 
166

Page 167

2.6 The Ardrossan Promenade project is the first phase of works to regenerate Ardrossan
Promenade at South Beach.  This aims to create a vibrant seafront destination to
encourage increased visitors, visitor dwell time and spend in the town. through the
creation of: 
• A community hub including café by repurposing the toilet block; 
• Accessible toilet facilities including a Changing Places standard facility;
• A dynamic and inclusive destination play area for community and visitor use;
• Bike parking, bike maintenance and e-bike charging facilities; and
• Beach huts for use for community and commercial activities. 
2.7 Cabinet approved the submission of an application to the Scottish Government’s
Regeneration Capital Grant Fund (RCGF) for the project in June 2021.  A funding
package of £1.008m has now been secured including £249,584 from the Big Lottery
Fund and £748,000 from RCGF.  This is matched with £10,416 from the Council
towards active travel infrastructure. The award under RCGF requires the funding to be
financially committed by 31 March 2023.  The conclusion of the CAT process will allow
the tenders to be awarded for the project and the required financial commitment. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the ongoing progress of the Community Asset Transfer assessment
process.
b) Agrees a revised rent of £600 per annum (10% of the current valuation of £6,000
pa). 
4. Implications/Socio-economic Duty 
Financial 
4.1 Through the transfer of the assets, the Council will achieve an income of £600 per
annum. There is loss of income to NAC in relation to the transfer of these assets due to
the loss of the income from the fair ground operator and other ad hoc events. The exact
amount involved is commercially sensitive data. In the longer term, there will be cost-
avoidance in other Council budgets. 
In addition, in partnership with NAC, ACDT have already attracted RCGF funding
totalling £748,000 to fund the hub. Big Lottery funding totalling £249,584 towards the
play area has also been secured. Both funds require to be financially committed in the
current financial year.  Community Investment Funding totalling £ £53,100 has been
agreed and North Ayrshire Council has allocated funds of £10,416 towards active travel
infrastructure. North Ayrshire Council has also committed additional funding totalling
£42,036 to assist in meeting a funding shortfall due to rising costs in the volatile
construction sector. 
Human Resources 
4.2 None. 
167

Page 168

Legal 
4.3 The approval is subject to satisfactory negotiation by Legal Services. 
Equality/Socio-economic 
4.4 There will be considerable socio-economic benefits from the transfers and the sum
proposed reflects the community benefits. These include a variety of positive impacts,
for the community of Ardrossan and the surrounding area. 
Climate Change and Carbon 
4.5 The transfer seeks to provide sustainable community facilities. 
Key Priorities 
4.6 The proposals contained within the original report support the following North Ayrshire
Council Plan priorities: 
• Active and strong communities 
• Inclusive, growing and enterprising local economy 
• People enjoy good life-long health and wellbeing. 
• Vibrant, welcoming and attractive places 
Community Wealth Building 
4.7 This proposal supports the following pillars of community wealth building: 
• Advancing community enterprises; 
• Advancing local ownership of underused land and buildings; and  
• Supporting local business activities and increasing the variety of ownership models. 
5. Consultation 
5.1 Consultation has taken place with Ardrossan Community Development Trust, local
organisations, Economic Development and Regeneration, Streetscene, Finance,
Estates, Facilities Management, Property Maintenance and Investment, and Legal
Services. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on (01294) 324415. 
Background Papers
Appendix 1 – Business Plan 
168

Page 169

1 
BUSINESS PLAN MARCH 2023 
Company No:  SC634107
Charity No:    SC052209 
169

Page 170

2 
Contents 
1. Executive Summary 
2. Background to Ardrossan Community Development Trust
• 2.1 Formation, Legal Structure and Membership
• 2.2 Track Record and Key Projects 
3. Vision, Mission and Values
• 3.1 Vison
• 3.2 Mission
• 3.3 Values 
4. Ardrossan - Our Community
• 4.1 History and Heritage
• 4.2 Socio Economic Background and Challenges
• 4.3 Community Assets 
5. Community Consultation 
• 5.1 Our Place Initiative
• 5.2 Three Towns Charrette
• 5.3 ACDT Community Workshops: WAVE particle 
• 5.4 Community Survey and Market Research 
6. Current and Future Projects and Opportunities
• 6.1 Current Projects
• 6.2 Future Opportunities 
7. SWOT analysis 
8. ACDT Strategic Objectives and Impacts 
• 8.1 Community
• 8.2 Physical/Environmental
• 8.3 Economic 
9. Key Stakeholders and Partners 
10. Forward Plan 2023/2024 
11. Management and Governance 
• 11.1 Trustees Profile
• 11.2 Staffing Roles and Responsibilities
• 11.3 Future Proposals 
12. Premises and Resources
• 12.1 Frank Sweeney Centre For Enterprise 
• 12.2 South Beach Promenade 
13. Risk Analysis 
170

Page 171

3 
14. Financial Projections 
• 14.1 Capital Project Funding and Finance
• 14.2 Operating Income and Expenditure Summary and Commentary 
Appendices 
• Appendix 1 Trustee Summary Profiles 
171

Page 172

4 
1. EXECUTIVE SUMMARY 
Ardrossan Community Development Trust (ACDT) was formed in 2019  to engage in activities
that benefit and support the community of Ardrossan - increasing opportunities, improving the
physical environment of the town, attracting more visitors and reviving the sense of pride in
the town. Currently we have more than 320 members and operate as a Charitable Company
Limited by Guarantee. ACDT is managed by a board of 10 local people with a range of skillsets
and significant experience within work and community settings.  We have secured office space
within the Frank Sweeney Centre For Enterprise from a key partner, Cunninghame Housing
Association, and funding from North Ayrshire Council to support our Development Officer for
an initial 18-month period. 
Local deprivation levels and the protracted difficulties arising from the decline of our former
shipbuilding and oil industries and tourism decline provide much of the backdrop and
motivation for our work – but so too does the continuing development of the ferry port and
marina, the visitor development potential of the South Beach promenade and the opportunities
offered to redevelop the former oil refinery site at North Shore moving forward. ACDT aims to
play a lead role in developing new projects while supporting our community partners to thrive
and develop as well. 
To guide our work over the foreseeable future we have adopted the following Vision
Statement.    
“Our Vision is to develop projects that contribute to the development of our Town. making the
most of its natural assets and creating an environment which encourages employment  &
volunteer opportunity; supports engagement, involvement, inclusion and general wellbeing;
and continues to improve commercial, community, recreational and visitor facilities which meet
the aspirations of Ardrossan residents.” 
We have identified a number of important changes we would like to help bring about in our
community. These ambitious outcomes will motivate and challenge us, help give focus to our
work and to prioritise the projects and initiatives which we develop. These are set out within
this Plan under Community, Physical / Environmental and Economic themes. 
These have been informed by several community engagement events and surveys over the
past 7 years, identifying which have been prioritised to regenerate the town. These include: 
• Development of the seafront and promenade; 
• Securing better sporting, leisure and play facilities particularly for young people; 
• Creating a town that tourists and visitors want to visit; 
• Enhancing the natural and historical assets of the town; and 
• Levering in funding & investment bringing employment opportunities 
The initial projects which ACDT have prioritised at South Beach are the first phase of works
to regenerate Ardrossan and help to create a vibrant accessible and inclusive destination for
local communities and visitors. This Plan sets out our  proposals for a fully accessible
children’s playpark, cafe and Beach Huts on the Ardrossan South Beach area of the town –
with in excess of £1.3m of capital funding from the National Lottery’s Our Place Programme
and the Scottish Governments Regeneration Capital Grant Fund to put these in place in 2023. 
Further project proposals are set out which ACDT will develop in the years ahead. These
include operation of a Community Benefit Fund for Sorbie Wind Farm; further phases of
Regeneration at South Beach; the Sustrans Ardrossan Connections project; plans to identify
172

Page 173

5 
and redevelop vacant and derelict properties into community assets; and an Advocacy project
in partnership with other local agencies. 
Finally the Plan sets out 5-year financial projections based on key assumptions on staffing,
premises and overhead cost projections and the anticipated trading, contract and grant
funding income necessary to sustain the organisation over this period. Overall our main
income source over the Plan period will be grant income, which is consistent with ACDT’s aim
and purpose as a charity. Income generation from beach hut, crazy golf, cafe rental and events
income will come on stream following the completion of the installation of all of the facilities at
South Beach. 
Staffing costs will, by some distance, be our largest cost category over the plan period – with
discussions already underway to secure grant funding support for both core and temporary
staff. We aim to continue to create opportunities for unemployed local residents in delivering
both our core services and in managing the facilities we will soon have on site at South Beach.
We have made provision for a lease payment to North Ayrshire Council  for the site at South
Beach, the terms of which are still under negotiation. and have ensured a growing annual
provision for utility bills in the face of the current fuel crisis. Provision has also been made for
repair and maintenance of South Beach premises and equipment following the end of defects
liability and manufacturer warranty periods. 
Based on these assumptions, we are budgeting for small annual surpluses across the Plan
period to provide us with the ability to accumulate appropriate levels of reserves for
contingency and organisational development purposes. 
173

Page 174

6 
2. BACKGROUND TO ARDROSSAN COMMUNITY DEVELOPMENT TRUST 
2.1 Formation, Legal Structure and Membership 
Ardrossan Community Development Trust (ACDT) was formed in 2019 following significant
community consultation within the Town via the Lottery funded Our Place Programme and the
Three Towns Charrette - both of which identified a range of locally agreed development
priorities. The Trust was formed to engage in activities that benefit and support the community
of Ardrossan, increasing opportunities, improving the physical environment of the town,
attracting more visitors and reviving the sense of pride in the town. 
ACDT’s objectives, as stated in the Articles of Association are: 
• The advancement of community development, including the advancement of urban/ rural
regeneration
• The maintenance, regeneration, and improvement of the communities physical, economic,
social and cultural infrastructure.
• The advancement of education, training, arts, culture, heritage, sports, recreation,
environmental improvement, social and economic wellbeing. 
Membership of Ardrossan Community Development Trust is open to: 
• Full members who are aged 16 and over and reside in the KA22 postcode area.
• Junior members who are aged between 12 and 16, with no voting rights.
• Associate members aged 16 years and over who do not reside in a KA22 postcode area,
and to organisations with no voting rights. 
Currently we have 320 adult members and 3 junior members and includes members from
other community organisations within the Town, including Ardrossan Community Association,
Ardrossan Castle Heritage Society, Three Towns Growers, Whitlees Community Centre & 
Ardrossan Community Sports Hub. 
ACDT is managed by a board of 10 people with key links to other community groups and skills
to progress projects for the town. 
Ardrossan Community Development Trust are currently a Charitable Company Limited by
Guarantee (Company No SC634107; Charity No SC052209). 
2.2 Track Record and Key Projects 
Since 2019 Ardrossan Community Development Trust has undertaken a range of activity:  
• Following on from the Lottery funded Our Place Programme and Three Towns Charrette,
ACDT commissioned further community workshop activity through Mike Hyatt Associates
and Wave Particle. Survey work was also completed by IBP Strategy and Research to
identify preferred sites and activities for proposed playpark and other regeneration activity
at the South Beach promenade. 
• ACDT secured £53,100 from the North Ayrshire Council Community Investment Fund
(CIF) to fund recruitment of a Development Officer for an initial 18-month period. The
Development Officer came in to post in June 2022. 
• We have a lease in place with Cunninghame Housing Association for the use of office
space within the Frank Sweeney Centre For Enterprise. This location gives ACDT good
visibility on the main street of the town, enabling the local public and trust members to drop
174

Page 175

7 
into the office during our opening hours from 9am to 5pm Monday to Friday, to engage
with ACDT Development staff. The Centre also provides ACDT with access to much
needed meeting and training space for our own use and for other community groups at no
charge. 
• We have developed detailed proposals for a fully accessible children’s playpark, cafe and
Beach Huts on the Ardrossan South Beach area of the town and have also generated a
list of other attractions we intend on creating to help bring visitors to the area including the
reinstatement of Crazy Golf to the Promenade. 
• Following development of these proposals we secured £274,542 of capital funding from
the National Lottery’s Our Place Programme and a further £748,000 worth of funding from
the Scottish Governments Regeneration Capital Grant Fund (RCGF) to enable ACDT to
bring our South Beach regeneration projects to fruition. Works are scheduled to
commence  in March 2023. 
• ACDT are key partners alongside North Ayrshire Council and Sustrans in the development
and delivery of the Ardrossan Connections project which looks to improve the National
Cycle Network through the Town, improve active travel  and address key issues in relation
to traffic movement and road landscapes. 
• Over a period of time we have developed a good following on Facebook with 1165 
followers engaging frequently with the page. We also have an informative website with
newsletter sign up and monthly emails sent to keep Trust members and the local
community up to date with our ongoing projects, future proposals and range of activities. 
This Business Plan has been produced to set out the mission and objectives for ACDT going
forward, establishing key issues and priorities identified by the local community, setting out
details of the projects we are bringing forward and highlighting future opportunities. The Plan
highlights the intended community, environmental and economic impacts we will be working
towards and the range of agencies and stakeholders we will be working in partnership. Finally
the plan provides information on our Board and proposed staffing arrangements, identifies
projected capital costs and associated funding for our key current projects at South Beach and
sets out 5 year income and expenditure projections, with detailed assumptions presented as
an Appendix. 
175

Page 176

8 
3. VISION, MISSION AND VALUES  
3.1 Vision  
Ardrossan Community Development Trust have adopted the following Vision Statement.    
“Our Vision is to develop projects that contribute to the development of our Town. making the
most of its natural assets and creating an environment which encourages employment  &
volunteer opportunity; supports engagement, involvement, inclusion and general wellbeing;
and continues to improve commercial, community, recreational and visitor facilities which meet
the aspirations of Ardrossan residents.” 
3.2 Mission 
“Ardrossan Community Development Trust’s mission is to engage and work with local
residents, local businesses, third sector and community organisations and partners to rebuild
and regenerate the town. We will do this by establishing, sustaining and growing projects,
groups, and premises for the benefit of  residents and visitors alike, making Ardrossan a better
place to live, work, volunteer and visit.”  
3.3 Our Values
Our core values are the platform from which we work, outlining what is important to ACDT and
guiding how we operate. These values will be reflected in the priorities, behaviours and
decisions made by our Trustees, staff, and volunteers.
The key values for Ardrossan Community Development Trust are:
• To be open, honest and accountable 
• To be led by our community 
• To create opportunity 
• To be collaborative and to work well in partnership
• To be entrepreneurial
• To be supportive, inclusive, creative and innovative in our approach
• To put emphasis on long term investment and legacy benefits
• To be sustainable
• To work in alignments with local and national policies and strategies including NAC
Community Wealth Building strategy and the Scottish Government’s Community
Empowerment Act.
• To supporting other groups and partners in achieving their goals
• To be accredited as a Real Living Wage employer 
176

Page 177

9 
4. ARDROSSAN – OUR COMMUNITY 
This section provides some background and insight into the development of  the town of
Ardrossan and some of the key socio economic challenges currently being faced by the
community. 
4.1 History and Heritage  
Ardrossan is a coastal town in North Ayrshire, known locally as one the ‘Three Towns’ along
with Saltcoats and Stevenston. It lies on the north side of Irvine Bay between Irvine and Largs.
Its advantageous coastal location gave the town a strategic position as an industrial, transport
and tourism centre since the 19th Century. 
The town grew significantly as a result of the increase in the shipbuilding, fishing and chemical
industries and new transportation connections developed to support the expanding harbour.
A strong community spirit grew as a result and remains to this day. However shipbuilding
declined in the 1950s and the harbour is now home to a busy ferry port with regular services
to the Isle of Arran and Campbeltown and a marina with significant traffic and tourists passing
through. 
Ardrossan also housed foundries and an oil refinery. The Shell Mex oil refinery was operational
from the early 20th Century before its closure in 1986. The last of the buildings located on the
site were demolished in 2003 leaving a significant area of derelict land on the fringe of the
town centre available to be remediated and brought back into use. A number of the shop units
in the town centre now stand empty now, with the Asda superstore which opened in 2007 the
principal retail offering in Ardrossan. 
Finally, Ardrossan was also a popular holiday destination for Scots in the early 20th Century
before the advent of cheap air travel and foreign holidays hastened its decline like other
seaside resorts. The long beaches on either side of the Harbour remain important sources of
leisure and recreation for locals and a draw for visitors to the area. 
4.2 Socio Economic Background and Challenges 
North Ayrshire is the fifth most deprived Council area in Scotland based on the Scottish Index
of Multiple Deprivation (SIMD 2020). Of the 186 data zones in the 2020 index for North
Ayrshire, 52 are in the 15% most deprived in Scotland, a slight increase of 1 since the index
was previously published in 2016. 
Within North Ayrshire the Three Towns locality, which contains Ardrossan and has a
population of around 32500, has a relatively stable population and good examples of
community cohesion and regeneration. Nonetheless the Three Towns are significantly
affected by poverty and inequality: 
• The Three Towns locality’s claimant count (estimate of people claiming unemployment
related benefits) for September 2021 was 8.1%, up from its pre-Covid-19 (February 2020)
rate of 7.3%. 
• Median gross household income in the Three Towns (£21,749) is the lowest in North
Ayrshire (£24,090) and only 73% of the median Scottish figure (£29,786). 
• 39% of the Three Towns’ population live in areas falling in the top 15% most deprived in
Scotland compared to 27.6% across North Ayrshire 
177

Page 178

10 
Ardrossan has a population of 10,536 according to Scottish Index of Multiple Deprivation 2020
statistics – accounting for around a third of the wider Three Towns population. 
When we drill down into demographic data at the localised Ardrossan level, the prevalence
and intractability of a number of key challenges become very apparent. Out of 13 data zones
in Ardrossan 4 rank within the worst 10% areas of deprivation in Scotland and 7 of the 13 rank
within worst 20% areas. As a result around 55% of the Ardrossan Population live in areas
officially recognised as experiencing multiple deprivation. 
This deprivation comes in many forms: 
• 5 of Ardrossan’s 13 data zones are in the worst 10% in Scotland in terms of income
deprivation – containing 38% of the local population. 
• Ardrossan remains an unemployment blackspot. The neighbourhood of Ardrossan Central
ranks the highest for both adult (9%) and youth (11%) unemployment in North Ayrshire. 7
of Ardrossan’s 13 data zones are in the worst 20% for employment deprivation in Scotland.
• 5 of 13 data zones are in the worst 10% for health deprivation in Scotland – with Ardrossan
Central having the lowest male life expectancy in North Ayrshire (68.2 years versus 75.3
years average) and the third lowest female life expectancy (75.2 years versus 80.1 years
average)
• These health inequalities are reflected in well above average numbers of hospital stays
due to alcohol and drug misuse per head of population, with 4 data zones exhibiting figures
which are at least double the national average.
• 70% of the population of Ardrossan live in data zones where the number of people with no
qualifications is above the national average 
The social and economic challenges faced by Ardrossan and the wider Three Towns have
been further exacerbated by the recent impact of Covid-19, particularly on health, income and
employment.  For example, travel restrictions and reduced ferry travel to Arran and
Campbeltown resulted in reduced visits to the town - impacting on the financial viability of a
range of local businesses reliant on ferry traffic and therefore local incomes and employment
opportunities.   
These are the key challenges which provide the backdrop and motivation for the work of
Ardrossan Community Development Trust and its partners in promoting the regeneration of
the area. The regeneration work being undertaken already by ACDT at South Beach aims to
contribute to the town’s recovery and addressing these challenges by building on the close
working relationships between ACDT, local organisations and NAC Services to tackle the
challenges faced.  In particular the South Beach project will assist in addressing a number of
important local challenges by: 
• Supporting local people into work through the delivery of employability programmes,
training and volunteering opportunities;
• Creating opportunities for local business and employment through the café and beach huts
element of the project; 
• Improving opportunities for social enterprise through the delivery of the project;
• Increasing visitor numbers and spend 
• Improving health and well-being by promoting opportunities for physical activity and active
travel via the improved infrastructure and facilities at the Promenade; and
• Increasing civic and community pride by creating opportunities to volunteer, engage with
and inform the project and fostering a sense of ownership of the coastal environment
178

Page 179

11 
4.3 Key Community Assets 
In recent years a lot of development work has taken place within Ardrossan by a number of
organisations. As a result, there are now a range of community assets providing a platform to
build on for the regeneration of the town. These assets are reflected in the map and table
below. (There is a community group page on the ACDT website listing more organisations
which exist in our town https://www.ardrossantrust.org/community-group-map/ ). 
The table below directly corresponds to the numbered locations featured on the map above,
giving the name and a description of each local community asset. 
179

Page 180

12 
Community Asset Description
1. Cunninghame
Housing
Association
One of Ayrshires leading social landlords with nearly 3,300
properties in North and East Ayrshire and Dumfries and Galloway.
The Association is headquartered in the town in modern premises
at Ardrossan marina. In addition to housing management and
development, CHA is very active in a range of community
regeneration activities including the development and operation of
three enterprise centres in the town and is committed to providing
support to ACDT and other local community-based organisations. 
2. Ardrossan
Library
A local authority run library providing computers, public meetings,
reading materials and hire. Resources for public learning.
3. Michael Lynch
Centre
The Michael Lynch Centre for Enterprise is an 8600 sq. ft facility
located in Princes Street, Ardrossan developed by CHA to provide
local business space for SME’s and social enterprises. The Centre
contains 18 offices and 2 training rooms over 2 floors and hosts a
number of important local social enterprises including: 
• Community Housung Advocacy Project.
• Ayrshire Independent Living Network .
• Royal Association for Mental Health.
• Triple Act Theatre and Arts 
4. Frank Sweeney
Centre for
Enterprise
The Frank Sweeney Centre for Enterprise is a 10,800 sq. ft. facility
located in Glasgow Street, Ardrossan. Managed by CHA, the
Centre contains 23 quality offices and training rooms, over 2 floors
providing office, training and meeting space for a number of
important local social enterprises and training agencies including:  
• North Ayrshire Council Employability Hub.
• Lennox Partnership.
• Citrus Energy.
• Penumbra.
• Skills Development Scotland.
• 3TFM.
• Ardrossan Community Development Trust (ACDT) 
ACDT currently have office space here where our Development
Officer and staff operate from and engage with the community. 
5. Ardrossan Castle Ardrossan Castle is a distinctive feature of the town and a local
visitor attraction based upon a hill overlooking the heart of the
town. Built around 1140, the land is now maintained by the local
authority. The Ardrossan Castle Heritage Society are developing
proposals to improve and preserve the site to maximise visitors.
They are also researching and sharing knowledge about the castle
with locals and visitors. 
6. Ardrossan Civic
Centre
This facility operated by North Ayrshire Council. provides various
hall spaces from 20 - 200 people capacity and host gym classes,
public meetings, events, parties and other community activities on
a regular basis. 
180

Page 181

13 
7. Ardrossan
Winton Rovers
FC
Ardrossan Winton Rovers Football Club established in 1900, play
out of Winton Park located within the heart of the town. Ardrossan
Winton Rovers are a Community Interest Company with Season
Ticket holders as Members. The club also has a thriving and
successful Youth Academy with 300+ local youths currently
playing within 17 teams. 
Proposals are being developed to assemble capital funding to
install a 3G Astroturf pitch at Winton Park, enabling much more
intensive community use and promoting public participation in
sport. 
8. Ardrossan
Bowling Club
Instituted in 1842, Ardrossan Bowling Club is located a few
hundred yards from Ardrossan's South Beach. With 2 well
maintained greens, the main objective of the club is to provide
facilities for the local community to participate in the sport of bowls. 
Out with bowling, the club has a large main hall which provides a
warm, comfortable and safe environment for members and the
local community to socialise. Guests and non-members are
welcome to hire the hall for private functions. 
9. Ardrossan South
Beach 
Ardrossan South Beach is an important local site for leisure and
recreation used by local residents and visitors alike. South Beach
promenade is an area which ACDT are in the process of
developing after numerous public consultations. This will include a
coffee shop, events, disabled wheelers, playpark, beach huts for
public rental and deck chair hire. 
10. Ardrossan
Academical
Rugby Club 
Ardrossan Rugby Club have pitches and a clubhouse on their site
at Sorbie Road. The Club have a full time Development Officer
employed to develop the sport and opportunities within the town.
The club have men’s teams and youth teams competing in local
and regional leagues. The clubhouse is available for hire to locals
for events and meetings.  
11. James Moffat
Centre
The James Moffat Centre for Enterprise provides 5600 sqft of
childcare facilities in Glasgow Street, Ardrossan. Owned by CHA,
the facility currently houses Busy Bees Nursery who provide
childcare services for children aged 6 weeks to 5 years old. Over
3 floors the building offers good quality space within a convenient
location and with good access to public transport and on street
parking. 
12. Three Towns
Growers 
Three Towns Growers is an allotment and community garden site
situated in Elm Park, Ardrossan. There are 50 plots, 32 outdoor
raised beds and 18 raised beds in the community polytunnel on
site, as well as a pond and bat boxes. 
TTG are dedicated to providing growing space and educational
opportunities to all members of the community. TTG pride
themselves in helping members to live healthier, more sustainable
lifestyles through gardening and social interaction. 
181

Page 182

14 
13. Whitlees
Community
Centre
Ardrossan Whitlees Community Centre is a thriving establishment
in the middle of Ardrossan and welcomes everyone to use the
facilities available. The Centre has a large hall, 2 small rooms,
lunge area and ca café open from 9.00 to 13.00 Mon to Sat. The
Centre organises and hosts a range of social events, fundraisers,
clubs and classes for the people of the community to participate in. 
14. Ardrossan Youth
Club
The Ardrossan Youth Centre is a purpose-built centre in Stanley
Road Ardrossan managed by the Ardrossan Youth Association
(AYA). 
15.  Ardrossan
Community
Sports Hub 
Ardrossan Community Sports Hub are a company limited by
guarantee with charitable status. They have premises on Glasgow
Street and operate a 7000 sqft Community Gym with over 300 local
members in Eglinton Road. ACSH use physical activity and sport
as a means of improving individual health, both physical and
mental, and creating a sense of wellbeing and resilience in the
community – working in partnership with many local organisations. 
16. Ardrossan
Indoor Bowling
Club
Ardrossan Indoor Bowling Club sits at the heart of the town in
Glasgow Street and is co-located on the Civic Centre site. It has
many members with a thriving social club element  which can hold
comfortably 150 people. 
17. Ardrossan Scout
Group
ASG are a grass roots, volunteer led, organisation who have
resided at their premises at Kilmeny Terrace in Ardrossan since
1967. ASG has played an important role in the growth and
development of young people from in and around Ardrossan. Their
Beaver, Cub and Scout sections are at work each week giving
young people opportunities through activity and adventure.
18. North Ayrshire
Foodbank
North Ayrshire Foodbank is a project of the Ardrossan Church of
the Nazarene based at the Nazarene church in Glasgow Street.
The foodbank is part of the Trussell Trust network of 428
foodbanks, working to tackle food poverty and hunger across the
UK. North Ayrshire Foodbank provide three days’ nutritionally
balanced emergency food and support to local people who referred
to them in crisis. 
Summary 
Many years after the decline of its former shipbuilding and oil industries and the movement
towards foreign holiday travel, Ardrossan continues to face a number of challenges outlined
by many of the socio economic indicators referenced above . However the continuing
development of the ferry port and marina, the visitor development potential of the South Beach
promenade and the opportunities offered to redevelop the former oil refinery site at North
Shore provide grounds forward optimism moving forward. 
So too do the raft of community organisations and facilities which have emerged in recent
years, reflecting our communities commitment and capability to create places and services
which support and provide opportunities for local residents. ACDT aim to continue to play a
lead role in developing new projects while supporting our community partners to thrive and
develop as well.
182

Page 183

15 
5. COMMUNITY CONSULTATION
ACDT was formed back in 2019 following a series of community consultations which, taken
together, played a key role in identifying a range of important local issues and priorities which
ACDT are now working with partners to address. These consultations and the issues which
emerged from each of them are set out in turn below. 
5.1 Our Place Initiative 
Back in 2013 the Big Lottery identified 7 deprived communities within Scotland with a lack of
community capacity and a limited track record in securing Lottery and other funding for
community-led activities. Ardrossan North East and Central was one of these areas. The initial
Our Place work involved a series of community engagement activities, including listening
surveys conducted by Community Renewal, the Our Place development agency appointed by
the Lottery.  A number of development ideas were generated during these events: 
•  Better play facilities in the town 
•  Events around arts, music, culture, and history 
•  Upgrade the main streets and tidy up local area 
•  More shops and amenities 
•  Activities and social space for young people 
•  Develop seafront and waste ground 
•  Opportunities for older generations 
•  Ardrossan to be a town that tourists come to visit 
•  More funding & investment bringing employment opportunities 
•  Sport and leisure facilities 
These ideas provided the focus for Lottery funding for themed activities over a 5-year period
from 2014 to 2019 which supported the community having more influence on decisions taken
locally, having more sustainable services and facilities that reflected local priorities, and people
feeling that their community was a better place to live. 
A number of important local projects and facilities developed from the Our Place programme
including, for example,:
• The Three Towns’ Growers who secured funding to create their community allotment
facility 
• The Ardrossan Community Association who received funding to refurbish the Whitlees
Community Centre 
• Ardrossan Castle Heritage Society who received funding to help stage a Castle carnival
recreating medieval scenes on the castle grounds, bringing the community together to
celebrate its heritage,
5.2 Three Towns Charrette 
A Charette was undertaken across the Three Towns in June 2017. Funded by North Ayrshire
Council and the Scottish Government, the exercise involved the use of the Place Standard to
help inform the emerging Three Towns Locality Plan. 
The decision by the Scottish Government to retain Ardrossan as the ferry terminal for the Arran
service, prior to the charrette, helped stimulate thinking around how to capture the economic
benefit of the flow of through-traffic and place-based improvements (e.g. creation of civic
space) to facilitate this, whilst the development of the Ayrshire Growth Deal bid included
183

Page 184

16 
proposals for the development of the Ardrossan North Shore site for both residential units and
a community campus incorporating a replacement for Ardrossan Academy 
The key points which emerged included the need to: 
• To protect the natural assets of each town. 
• To take advantage of local history as a tourism asset. 
• To join up provision of facilities along the seafront, such as public toilets, play space,
refreshments, changing space, beach huts. 
• Encourage local enterprise along the seafront to attract visitors. 
• Make use of the sea for sporting activities; and 
• Give visitors a reason to visit the towns and motivate local people to use their town centres. 
It identified a range of projects which subsequently helped inform ACDT’s proposal for
Ardrossan South Beach including: 
Centres and Hubs 
•  Pop up spaces for social enterprises and start-ups 
•  Spaces for artists and creatives 
Shoreline 
•  New Facilities 
•  Active Shoreline 
•  Accessibility 
•  Shelters 
•  Cycle facilities 
Greenspace 
• Better maintenance of open space 
Promotion 
•  Developing year-round events and activity programmes 
•  Signage and promotion of site-specific features 
5.3 ACDT Community Workshops: WAVE particle 
Following on from Our Place and the Three Towns Charrette, ACDT engaged in further
consultations with the local community in February 2020 to help develop detailed proposals
for an inclusive play park in the town – to be funded by Our Place Lottery funding. 
ACDT commissioned WAVE particle to hold two workshops in early 2020 which considered 4
green spaces within the town as potential sites for the development of a playpark. South Beach
was the preferred location for the with local people identifying a number of key issues
including:  
• Importance of creating a facility for both locals and visitors. 
• Desire to create a destination Ardrossan residents would use for a day out. 
• Desire to create an inclusive and accessible facility with an open space approach. 
• Significant attraction of seaside and island views and local heritage. 
• Desire for a safe, social outdoor space particularly for isolated groups in the community. 
• Desire for specific facilities, including toilets and cafes. 
• Recognition of the potential for the former toilets to be regenerated. 
• Importance of lighting and signage;
184

Page 185

17 
• Aspiration for the facility to be unique to Ardrossan and grounded in the town’s heritage. 
5.4 Community Survey and Market Research 
By summer 2021 ACDT had secured Our Place Lottery funding to develop the inclusive play
park and had developed more detailed proposals for other regeneration activities on South
Beach promenade. The notion of the beach and its Promenade as a significant asset for the
town, both for the local community and in attracting people into the town, has consistently
emerged across all community engagement activity.   
To help inform the community about the South Beach proposals, obtain feedback to refine
them and to help support a submission to the Scottish Government for Regeneration Capital
Grant funding, ACDT commissioned IBP Strategy and Research to undertake a large face to
face survey - generating almost 450 responses from local residents, visitors and businesses.  
This survey and consultation work concluded: 
• Over half of survey respondents overall indicated that they visit South Beach promenade
but the great majority of visitors from out with the KA postcodes (89%) said they visit only
occasionally or less often. At present, use of the Promenade was most commonly for the
“informal” activities of general relaxation, walking and dog walking . 
• The average estimated time spent on a visit to the Promenade is 1.49 hours though this
is higher (2.23 hours) amongst visitors from outside the KA postcode areas. Average
spend in the shops and eating / drinking places of Ardrossan on a typical visit to the
Promenade is estimated at £14.05 - relatively low for a typical “day out”. 
• Respondents were asked whether various strands of the proposals developed by ACDT
would be good for Ardrossan with responses summarised in the table below. A significant
majority considered that each of these elements would be “good for Ardrossan”, ranging
from 73% for a new and extended play park to 97% for a community-run café and,
especially, 98% for fully accessible toilets. Families with children were particularly positive
about the new and extended play park and about the “crazy golf” type facility, and younger
groups were more enthusiastic than others about the retailer beach huts. 
185

Page 186

18 
• 60% of visitors to the Promenade indicated that a development such as this would make
them visit more often – with 60% indicating it would encourage them to stay longer at the
Promenade when they do visit. 
• Respondents were asked about the potential impacts which the South Beach development
would have on the local community and Ardrossan generally. The results are set out in the
table below. A high proportion believe the project would have a positive effect on the local
economy generally (92%), encourage others to invest in the town (92%) and increase the
number of people that visit Ardrossan for leisure purposes (91%). 
Conclusion 
As outlined above, over the past 7 years, Ardrossan residents have actively participated in a
range of community engagement events and surveys to establish the issues which they feel
should be prioritised to regenerate the town. 
186

Page 187

19 
A number of consistent themes emerged which have provided real focus for the work of ACDT
and other partners to date in developing new project proposals to date and in the years ahead.
These include: 
• Development of the seafront and promenade; 
• Securing better sporting, leisure and play facilities particularly for young people; 
• Creating a town that tourists and visitors want to visit; 
• Enhancing the natural and historical assets of the town; and 
• Levering in funding & investment bringing employment opportunities 
187

Page 188

20 
6. CURRENT AND FUTURE PROJECTS AND OPPORTUNITIES 
Since inception ACDT has been active consulting with the community to develop important
new projects for the town. Fortunately, we have had a great response from funders and we
are now on the verge of completing projects which will create important new facilities for the
Town. Further details on these are provided below. 
Moving forward we have proposals in mind for further phases of our work at South Beach,
whilst the work we have been doing with Sustran’s on an active travel network and the
proposals for us to manage the distribution of Community Benefit Funds on behalf of a local
Wind Farm, will come to fruition in the near future. Details of these are also provided below
together with an insight into other potential opportunities on the horizon. 
6.1 Current Projects 
The 2 projects which ACDT have been working to bring to fruition at South Beach are part of
a wider programme of regeneration across Ardrossan being delivered by ACDT and NAC.
These projects are the first phase of works to regenerate Ardrossan Promenade at South
Beach to create a vibrant accessible and inclusive destination for local communities, wider
North Ayrshire population and visitors. 
We aim to make South Beach a place for all the community to meet and to relax. The
development will be unique to Ardrossan and aims to celebrate the people and history of the
town. We will create an attraction for the large volume of visitors passing through the ferry port
every day, so that they stop and add more to the local economy. The uniqueness will come
from design input from the community and an art/landscape-based approach. 
South Beach Promenade (Phase 1) - Inclusive Playpark Facilities 
Using Our Place funding secured from the National Lottery,  ACDT plan to install a new play
park which will be connected to the existing playpark. Work on the new facility is scheduled to
commence in Spring 2023 and to be completed within 3 months. The new playpark will have
accessible basket swings; a swing for wheelchair users; inclusive wheelchair roundabout;
inclusive trampoline; a boat swing; and safety surfacing – all together providing the people of
Ardrossan with a dynamic and inclusive play facility. The swing park will be surrounded with
additional landscaping which will include new trees and hedging.
A traditional hedged maze will also be installed, connected via a footpath to the main park with
some play park equipment at its core.
We will also bring back to life the redundant crazy golf course. The bespoke 18-hole course
will be brightly coloured with each hole having its own flagpole at a 2.4 metre height making
the course easily visible from the surrounding area. The crazy golf will provide opportunities
for competitive fun between all generations and be a great asset in attracting locals and visitors
alike to the prom to enjoy simple easy activity and interaction. 
The aims of this project, agreed with the National Lottery, are: 
• To reduce inactive or sedentary lifestyles in children by increasing participation in play
and healthy leisure activities - by providing free access to new play facilities and also
involving Ardrossan Community Sports Hub to deliver free fitness activities within this
area. 
188

Page 189

21 
• To improve social development in children by creating new opportunities in a fully
inclusive space for all ages & abilities; to enjoy and learn through play and meet and
engage with other children and the wider community 
• To redevelop and revitalise a tired beachfront, creating a new outdoor space to
increase community engagement with their Town and its facilities and encouraging
visitors to stop and spend within the local community 
South Beach Promenade (Phase 1) – Regeneration Project 
ACDT have already been able to install new facilities on South Beach. 
Deckchair Project – A successful Coastal Waters funding application allowed ACDT to
commission 100 deckchairs for promenade users which are free to hire. Each deckchair is
bespoke with the canvas specially created with colour, pattern, image, and/or text that is
specifically relevant to Ardrossan. 
The deckchair project was used as an engagement tool, whereby the schools and the local
community were invited to participate in a series of workshops to generate the words, phrases,
images and overall colour for the chairs. These workshops focused on learning more about
our waters and coasts and how to look after them. 
Wheelers & Hippocamp project – ACDT provide free use of disability chairs called Wheelers
and Hippocamp chairs to enable disabled residents and visitors to have access to the sand
and water at South Beach. This is a very exciting inclusive project which means that everyone
can have access to the beach along the promenade 
The project will be serviced from the rear of the planned Community Hub and is planned to be
open all year round. We see this is the start of an inclusion for all project that will see more
families access Ardrossan South Beach for a day out or a stroll along the beach. 
ACDT have also secured funding from the Scottish Government RCGF programme to enable
the development of a number of elements of our proposed programme of works at South
Beach to commence in March 2023. This includes: 
• Creation of a new Community Hub including café by repurposing the site of what is
currently a semi derelict toilet block. This will be operated as a community venture via
a lease to another local community organisation. 
• This will build upon the existing beach wheelers and deckchair project which ACDT
already have in place on the promenade and provide accessible toilet facilities
including a Changing Places standard facility for café, community and visitor use. 
• Beach huts for hire for commercial activities by local businesses, traders or community
organisations. These will provide accessible facilities on the Promenade to encourage
longer visitor dwell time and generate trading income from ACDT. 
• Bike parking, bike maintenance and e-bike charging facilities to support active travel
to and from the Promenade, through the towns and along the National Cycle Network
routes. 
The creation of the playpark, Community Hub, beach huts and the other facilities identified
above will necessitate ACDT entering into a long lease (25 years) with North Ayrshire Council
189

Page 190

22 
for the relevant area of South Beach required to locate the development. This is currently
under negotiation and is expected to be concluded in early 2023. 
The facilities will encourage the local community to connect with the promenade and support
the regeneration of Ardrossan by: 
• Creating a vibrant, welcoming, inclusive sustainable and attractive seafront destination
attracting tourism investment and visitors all year round.
• Bringing the existing vacant toilet block back into sustainable positive use.
• Creating a sustainable community café model which facilitates community interaction,
reduces social isolation, and supports social enterprise.
• Improving local quality of life through increased opportunities for physical activity,
volunteering, and employment.
• Addressing the deficit in facilities at South Beach towards achieving Blue Flag status. 
• Supporting physical activity and sustainable travel on the Promenade and between the
towns; and 
• Creating opportunities for volunteering, social enterprise, business and employment
including pop up shops via beach hut facilities. 
Ardrossan Connections 
Ardrossan Connections is being delivered by Sustran’s Scotland (a charity whose aim is to
make it easier for people to walk, cycle and wheel) in partnership with North Ayrshire Council,
The National Transport Agency for Scotland and Ardrossan Community Development Trust.
The project partners take part in a Delivery Group with ACDT’s involvement being important
in ensuring the long term direction of the project represents the communities’ priorities and
aspirations. 
The aims of the project are to 
• Provide safe, accessible and attractive walking, wheeling and cycling route for residents
and visitors and improve the attractiveness of the National Cycle Network Route 73 and
753 between the Three Towns.
• Create a sense of place in the centre of Ardrossan that celebrates local heritage and
encourages more inbound visits to the town centre.
• Improve awareness of National Cycle Network and benefits of active and sustainable
travel.
• Reduce transport poverty and allow more people to experience the health and wellbeing
benefits of travelling actively and sustainably.
• Empower the local community to influence decisions affecting their daily lives and their
local environment 
6.2 Future Opportunities 
Whilst the procurement and physical work on the construction of the new facilities at South
Beach and their subsequent operation will be a key focus in late 2022 and all of 2023, ACDT
Board and staff members continue to work on several other projects will we hope to bring to
fruition in the next few years. 
Sorbie Windfarm Community Benefit 
ACDT have also entered into a Memorandum of Understanding in relation to managing a
Community Benefit Fund on behalf of Energy farm UK Sorbie LLP UK in relation to the Sorbie
190

Page 191

23 
Wind Farm which is proposed to be sited approximately 2km north of Ardrossan.  Current
proposals are for a 3 Turbine Wind Farm which would generate c12 Mega Watts of wind
power. 
The developer proposes offering a Community Benefit Fund to the community based upon
and annual payment of £5000 per MW of generation capacity installed on the Sorbie Wind
Farm. This sum will be guaranteed for the lifetime of the development, which is intended to be
twenty five years from the date of commissioning, and the payment would be distributed evenly
between the Three Towns communities. 
ACDT therefore anticipates receiving an annual payment for distribution based on £1,666.67
per MW of generation capacity installed on the Sorbie Wind Farm – potentially around £20,000
per annum. (Although the annual fund total will be dependent on the final installed capacity of
the Sorbie Wind Farm). 
The Trust will agree a funding criteria, a panel for decision making and ensure accurate
records are retained in relation to the same allowing access to small local grant funds for
individuals and organisations within the Town.   
South Beach Promenade – Future Phases 
ACDT have secured planning permission from North Ayrshire Council to develop further
phases of our South Beach proposal - although funding for this work has still to be secured.
Our plans include: 
• Mini Castles on Mounds  - mini castles cast from sandcastles made by the local
community located on grass mounds 
• Washed Up on the Beach – play installations involving boulder stepping stones and
seats, shipwreck timber, sand diggers/waterspouts, balancing logs and willow dens 
• Climbing Boulders - Artificial boulders designed for climbing of all ages/rock works arch
boulder and rock works mini boulder supplied by sutcliffe play. 
• Wavefield – low linear  mounds for informal play rolling and climbing 
• Ship Wind Vanes - Wind vanes designed by the local community representing the ship
building history of Ardrossan/ along the path edge an informal palm tree avenue. 
• Theatre Stage – A stage to allow concerts, theatre, a place to show movies and
emerging talent in all areas of art. 
• E-bikes / Charging – We will provide charging points for vehicles and bikes and provide
Sheffield stands for bikes. 
Safer Shores Project 
Connecting with other community groups, ACDT have joined forces with Voice of Ardeer
(Stevenston) & S.A.L.T. (Saltcoats) to create a 3-pronged approach to promote community
safety along the 3 towns shoreline. 
191

Page 192

24 
The project involves the placing of CCTV cameras along the South Beach Promenade,
Saltcoats Promenade and the Ardeer shoreline to aid public safety and to protect the
community assets currently in place and those planned. The 3 groups are working collectively
to fund the CCTV co-produced project Safer Shores. 
Derelict Land and Buildings 
We are aware that every town centre faces the challenges of an evolving retail pattern, and
we will work to make sure that our town centre becomes as vibrant and thriving as much as
possible. We want to have a town centre that is diverse and sustainable and where our
community and visitors can live, work, and enjoy. We can only do this through sustainable
regeneration, achieved with  collaboration and investment. 
The Trust plan on looking at derelict properties and land within Ardrossan,  and, where
possible, bring into community ownership and develop plans to regenerate them into new
community spaces,  and valuable community assets. 
Advocacy Project 
ACDT are in the process of setting up a partnership project with Ardrossan Community Sports
Hub (ACSH) and the Community Housing Advocacy Project (CHAP) to provide the local
community with an advocacy worker who will give advice on housing, benefits, money, and
welfare matters. This will be vital support to the community during the cost-of-living crisis,
particularly as we live in an area of multiple deprivation. The project partnership have been
successful in seeking CIF funding and are advertising at present for an Advocacy Officer. 
192

Page 193

25 
7. SWOT ANALYSIS 
In order to summarise the key factors influencing the environment which ACDT currently will
operate within, and pulling together all of the information set out in the Plan to date, a SWOT
analysis has been created. This is set out below 
Strengths Weaknesses
• Good premises secured in the town
centre
• Support from North Ayrshire Council
• Experienced, committed & pro - active
trustees
• Strong Membership base - over 320 local
residents
• Extensive Community Consultation to
inform ACDT priorities
• Excellent relationship with CHA
• Good website and social media exposure
• Significant turn outs at events and high
level of community interest in projects run
by ACDT
• Successfully secured Lottery and Scottish
Government Capital Grant Funding for
South Beach Project
• Recruitment of Development Officer 
• Good use of employability Programmes to
support core staff
• Very good relationships with local
community-based organisations
• Providing a unique opportunity for
wheelchair users to get on the beach 
• Lack of local infrastructure to support
community leisure and recreation
facilities
• High levels of deprivation locally in
Ardrossan presents key challenge to be
addressed
• Time limited funding for current staff
• Ongoing training and investment
required to ensure staff development
• Requirement for ongoing grant funding
support over the next 5 years to sustain
current business model 
Opportunities  Threats
• Chance to enhance local sense of civic
pride and identity 
• Develop infrastructure to stimulate growth
in local economy
• Improve local mental health and social
isolation
• South Beach Promenade is a visible
location helping to raise profile of ACDT
• Creation of jobs for local people 
• Opportunity for coffee shop to be
outsourced to local operators
• Ability to put on exciting events for locals 
• Increase income generation to increase
ACDT sustainability and core staff costs 
• Beach Huts would provide hire income
potential 
• Charitable status will provide benefits in
terms of  accessing more funding streams 
• Very competitive capital and revenue
funding climate 
• Expertise required to operate as a SCIO
that can obtain funding successfully 
• Need to continue and develop the
strength of the ACDT board of Trustees
• Need to complete negotiations with NAC
on South Beach Lease
• Reliant on agreement with NAC for
maintenance of facilities on South
Beach in current austerity climate
• Need to ensure availability of town
centre premises beyond current lease
with CHA 
193

Page 194

26 
8. ACDT STRATEGIC OBJECTIVES AND IMPACTS 
Based on the Vision and Mission we set out earlier in this Plan, we have identified a number
of important changes we would like to help bring about in our community. These describe
positive differences and impacts we want to work towards with the community and our key
partners and will provide a focus for our activities over the duration of this Plan. 
These ambitious outcomes will motivate and challenge us, help give focus to our work and to
prioritise the projects and initiatives which we develop. 
These are set out below under Community, Physical / Environmental and Economic themes. 
8.1 Community 
Help empower the Ardrossan community to have a positive identity and strong voice in local
decisions to maximise community well-being and resilience: 
• Continue to develop as a key community anchor organisation offering effective support
to community based groups to secure funding and resources to sustain important
services 
• Provide effective means for the Ardrossan community to be involved in designing and
delivering the services that affect them and which meet their needs and aspirations 
• Work collaboratively with partner organisations across the community to ensure strong
and effective community networks are in place 
• Help promote and celebrate community achievements and events to promote
confidence and a sense of civic pride 
• Work to support the aims of community wealth building and asset development to
ensure the community can play a lead role in community regeneration 
• Ensure opportunities for involvement in ACDT’s activities from the widest spectrum of
local people to ensure diversity and inclusion are at the heart of ACDT’s approach 
• Work with partner organisations to promote initiatives to tackle poverty and inequality
and developing community resilience and well being 
• Help improve local residents and visitors awareness and understanding of climate
change, sustainability, and the natural environment through ACDT programmes and
projects 
8.2 Physical / Environmental 
Promote physical and environmental regeneration projects which promote transformational
change for Ardrossan: 
• Improve the appearance and attractiveness of the community, promoting Ardrossan
as a place where people want to live, work, volunteer, socialise and invest 
• Help create new spaces for community, enterprise, learning and retail activities within
the town, easily accessible by public transport and on foot.
194

Page 195

27 
• Bring redundant/ derelict land, buildings or facilities back into productive community
use where this is feasible and viable. 
• Assist in the development of new community assets and facilities which can act as a
focal point for services which benefit the community and its residents. 
• Capitalise on Ardrossan’s location, natural environment, coastline and heritage as a
basis for developing new spaces, events and initiatives which help develop local
identity and civic pride. 
• Ensure physical regeneration projects are developed in line with best practice
guidelines promoting efforts to move towards Net Zero in terms of carbon emissions. 
8.3 Economic 
Contribute to the regeneration of the town and deliver economic benefit for all sections of the
community: 
• Source and lever in capital and revenue funding to create and sustain projects and
services which provide benefits to the community from this investment. 
• Develop initiatives and facilities which attract visitors, residents, businesses and
enterprising activity to Ardrossan, increasing footfall and spend in the town. 
• Work in partnership with local business and other key stakeholders to help diversify
the local economy and extend the range of employment, retail and leisure and 
recreation opportunities available to local people 
• Help create and sustain jobs and training opportunities for local residents through
ACDT and partner activities and projects 
• Support the creation of a range of volunteering and learning opportunities for local
residents, increasing local employment potential. 
• Further develop ACDT’s role as a social enterprise and provide advice, guidance and
developmental support where required to other local organisations 
• Support the development of transport and digital connectivity for local residents,
improving access to employment, education and cultural opportunities. 
195

Page 196

28 
9. KEY STAKEHOLDERS AND PARTNERS  
Since our formation in 2019 we have been able to develop a range of productive partnerships
with key stakeholders and partners. The support and assistance secured, and some of the
potential opportunities for future partnership working, are set out in the table below.  
Partner Current / Future Partnership Activity  
North Ayrshire
Council
• Ongoing support from NAC Connected Communities Staff to
support ACDT to develop and grow as an organisation and to
develop key projects
• Funding support for market research and social return on
investment survey work to support RCGF funding bids for
South Beach Promenade project
• Strategic partner and match funder (£10,000) for South Beach
Promenade Regeneration Project
• Assistance to secure funding from Kickstart programme to
support ACDT temporary employees 
• Contribution of £53100 funding towards salary costs of
ACDT’s Community Development Officer
• NAC will enter into  a 25 year lease with ACDT for South Beach
site on which playpark, café, beach huts and other facilities will
be located.
• NAC gardeners will continue to maintain the natural
environment at South Beach as part of the lease agreement
arrangements.  ACDT will work in partnership with Streetscene
to employ a modern apprentice to assist  on-site day to day.
Further negotiating will take place with NAC in relation to future
phases of development as funding is secured. 
• ACDT as a community anchor association will also seek to be
involved in the planning and design stage of the new North
Shore Campus providing input from local people on issues
such as transport, leisure facilities management, library
service etc  
Cunninghame
Housing
Association
• £5000 Match funding contribution to Stage 1 Our Place/Lottery
Funding
• Provision of Office, meeting and training space for ACDT
within Frank Sweeney Enterprise Centre at peppercorn rent
• Service level agreement for ACDT to provide managed
reception service at the Frank Sweeney Centre.
• Ongoing development support to ACDT Board from CHA’s
Head of Social And Economic Development 
• Annual funding to ACDT overheads and operational costs from
23/24  
Whitlees
Community
Centre
• Development opportunity for Whitlees to operate new
community café at South Beach project  
Three Towns
Growers
• Opportunities to identify linkages and volunteering
opportunities between the community café and the allotments
and associated projects  
196

Page 197

29 
Sustrans • Ardrossan Connections project team have identified
opportunities to design and implement high-quality public
space and upgrades to the National Cycle Network (the
Network) and the area it serves. Improving the Network in
Ardrossan will build on recent and ongoing transport and
planning developments in the area, enabling the route
to act as a high-quality connection to the centre of Ardrossan,
ferry terminal and also as a strategic route between the
Three Towns in North Ayrshire.  
Ardrossan
Community Sports
Hub
• Delivery by ACSH staff of fitness activities and partnership
events on the South Beach Promenade site and elsewhere
within the town  
Ardrossan Castle
Heritage
• Anticipate partnership working to establish a partnership with
Ardrossan Castle Heritage Society to improve the local tourist
infrastructure by highlighting links between the South Beach
Promenade and the nearby Ardrossan castle   
National Lottery  • The National Lottery Our Place Programme provided Funding
of £274,542 towards the construction of an Inclusive Playpark
on the South Beach Promenade in Ardrossan.  
Energyfarm UK
Sorbie LLP
• ACDT will work with this windfarm developer to manage a
Community Benefit Fund for Ardrossan, overseeing and
administering the distribution of funds to community groups.  
South Beach Care
Home 
• Providing opportunities for local Care Home Residents to be
able to get onto the beach on Disabled Wheelers   
197

Page 198

30 
10. FORWARD PLAN – 2023/2024 
Annual Action Plans will be developed by the Community Development Officer and presented
to the ACDT Board of Trustees for approval. This section summarises some of the key tasks
which ACDT require to undertake in the 2023/2024 period in response to the issues set out in
the SWOT above. 
Community Forum 
Create a community forum that will bring together community members and groups to promote
working together to improve the local community, addressing many of the issues and concerns
that we have. This will help underpin the relationship not only with community groups but with
our key partner Cunninghame Housing Association. 
The Community forum can be used to: 
• Provide an opportunity to share all the great things which are happening in the local area,
as well as to discuss and collectively address local issues and concerns.
• Support individuals and groups to be actively involved in the community through
connecting with other people and groups, enabling the sharing of ideas, and providing
access to support and funding.
• Engage with each other about local priorities and provide opportunities to influence plans
and services which will impact on our local area.
• Focus on wider community issues rather than individual complaints or individual case work
issues. 
Continued Promenade development 
Continue the regeneration of the South Beach Promenade, promoting use and public
participation in community wealth building. 
• Continue to seek uplift in funding to finance Phase 1 of the plans detailed previously
• Construct the new Playpark, Maze, Crazy Golf and Community Hub & Beach Huts within
the agreed timelines. This will see construction start February and be completed by the
end of July.
• Seek funding to complete phase 2-4 of the promenade regeneration in.
• Plan for phase 2-4 of the South Beach regeneration to take place.
• Hire a modern apprentice in partnership with Streescene to care for the landscaping of the
area covered in phase 1. 
Employability & Staff Development - 
As it continues to develop ACDT will seek to find funds and use employability programmes
to sustain the employment of existing staff and provide paid opportunities for unemployed
local residents within the planned projects at South Beach, its main base at the Frank
Sweeney Centre and its satellite office at 6 Glasgow St, Ardrossan. This will include: 
• Securing further funding to maintain the Community Development Officer Position which
is fundamental to the day to day management of the organisation.
• Manage/staff to ensure full time provision on the Crazy golf and Wheeler/
Hippocamp/Deckchair project full time during peak season, 7 days per week 11 am – 6
pm.
198

Page 199

31 
• Provide reception cover at its main base, The Frank Sweeney Centre 82-84 Glasgow St,
Ardrossan, 9am – 5pm weekdays.
• Develop staff, providing worthwhile qualifications/training that allow personal growth. 
Advocacy Project - 
ACDT are in the process of setting up a partnership project with Ardrossan Community Sports
Hub (ACSH) and Community Housing Advocacy Project (CHAP) to provide the local
community with an advocacy worker who will give advice on housing, benefits, money, and
welfare matters. Based at the 6 Glasgow Street satellite office, this will be a vital support to
the community during the cost-of-living crisis, particularly as we live in an area of multiple
deprivation. 
Event Organisation 
Lead the community in an event calendar promoting all that takes place within the community,
incorporating new events and promote community well-being initiatives in general. These
events could be based on the following range of activities: 
• Debt, money advice and benefits support
• Short term financial help in a crisis
• Housing advice
• Access to low-cost food
• Practical support to improve mental health
• Finding employment/Advice on employment issues
• Keeping active and healthy
• Achieving a healthy weight for the whole family
• Improving your cooking skills on a budget
• Managing type 2 Diabetes
• Stopping smoking
• Practically and emotionally support to help you build confidence, independence and
connecting you to your local community 
199

Page 200

32 
11. MANAGEMENT AND GOVERNANCE 
11.1 Board of Trustees  
Ardrossan Community Development Trust’s Board meet on a monthly basis on 2nd Monday of
the month. We currently have 10 Board members, with a range of skillsets and significant
experience within work and community settings – ranging from senior management within a
local housing association, university lecturing, training management, engineering and the
social care sector to retailing, managing community based organisations, tenant and resident
associations and neighbourhood watch schemes. 
Summary profiles for each Board member are contained in Appendix 1. 
11.2 Staffing Roles and Responsibilities 
ACDT is keen to ensure paid employment opportunities are created for local residents and to
this end have the following staffing structure in place. 
Community Development Officer 
During early 2022 ACDT secured £53,100 funding from North Ayrshire Council’s Community
Investment Fund to support the initial 18 months of salary and expenditure for a Community
Development Officer to ensure existing projects move forward to completion and respond to
emerging needs for further development opportunities. Recruitment to the Community
Development Officer post was completed in June 2022, with a local Ardrossan resident
appointed to the role.  
The main duties of the Community Development Officer post, which reports directly to the
Board, include:  
• Initiate and develop projects and services to meet  identified community needs
• Carry out feasibility work, identify potential funding sources, and manage resources as
required. 
• Implement project planning, including defining deliverables, setting goals and
objectives, producing schedules and timescales, identify and manage risks.
• Supported by the ACDT Board, facilitate and motivate teams formed for individual
projects (which may involve Directors / Volunteers / Contractors / Staff / Funders),
ensuring clear communication of key information and supporting good governance.
• Work with the Company Treasurer to ensure project budgets are defined, managed
and adhered to in line with funding requirements. 
• Carry out monitoring and control activities to track the progress of projects and record
outcomes, reporting progress regularly to the ACDT board
• Attend meetings to deliver updates to the ACDT and the Community.       
In addition we have recently appointed a full time Receptionist based at the Frank Sweeney
Centre for Enterprise. ACDT have entered into a service level agreement with Cunninghame
Housing Association to provide a managed reception service for the Sweeney Centre. 
Consequently our Receptionist undertakes a range of duties including: 
• receiving visitors; 
• managing room bookings for training and conference facilities; 
• liaising with CHA regarding report of repairs; 
200

Page 201

33 
• and provision of administrative and clerical support to ACDT’s Community
Development Officer. 
Temporary Employees – Employability Programme 
We have also managed to create posts for 2 temporary Customer Contact roles at our South
Beach, funded via local and national employability programmes, and who carry out the
following range of duties on the basis of 25 hours per week: 
• opening and securing at the beginning and end of the day of ACDT’s storage facility
housing the disabled wheelers and deckchairs; 
• issuing disabled wheelers to wheelchair users to access the beach, completing
associated paperwork; 
• issuing deckchairs to customers, completing records and ensuring chairs are returned; 
• taking payment for the issue of golf balls and putters to be used on crazy golf site and
cashing up at the end of the day; 
• cleaning/sanitizing items on return to the facility 
• any other general duties required by the Community Development Officer 
These posts are for fixed time periods of 6 months in the first instance, with the possibility of
extensions subject to progress and the availability of additional funding. 
ACDT are a Real Living Wage employer and will formally pursue this accreditation going
forward. 
Our current staffing structure is summarised in the chart below 
ACDT Board -
Chair
Community
Development
Officer
Receptionist
Customer
Contact
Asssitant
Customer
Contact
Asssitant
201

Page 202

34 
11.3 Future Staffing Proposals 
Going forward ACDT aim to: 
• Secure funding to extend the contract for our Community Development Officer beyond the
initial 18-month period and are currently pursuing grant funding opportunities in this regard
including the Scottish Government’s Strengthening Communities Fund
• Secure funding to extend the contract for our Receptionist at the Frank Sweeney Centre
for Enterprise, with grant funding being pursued to supplement the fee income secured
from CHA for the provision of the managed reception service.
• Work with North Ayrshire Council’s Employability service to provide temporary
employment opportunities for 2 staff, both on a 25 hour per week basis, at Ardrossan South
Beach in order to oversee the operation and administration of the new playpark and beach
hut facilities scheduled for completion in mid-2023, in addition to the existing deckchairs
and disabled wheelers facility. 
In preparing the Plan we consulted with North Ayrshire Council Employability Services as
they will be the key agency who will manage access to employability funding. 
During 22/23 a long term unemployed paid placement programme was created within North
Ayrshire which ACDT were able to use to support our existing temporary staff posts. It is
possible that a similar programme will continue next year but, at the time of writing, funding
allocations for next year are still to be confirmed as are potential programmes. 
North Ayrshire, like all other local authorities, have been given an allocation of UK Share
Prosperity Funding and have submitted a prospectus with outline proposals on how this will
be funded. It is anticipated that over the 22/23 to 224/25 period c£2.9m of People and Skills
funding will be available through this source, in addition to funding from the Scottish
Government No One Left Behind programme. Funding is likely to continue to be targeted
towards young people, parents and generally those furthest from the labour market – with
significant emphasis being place on community engagement and working with community
based organisations to create opportunities. 
On this basis within the income assumptions underpinning this plan we believe it is realistic
to: 
• Provide for wages costs for 4 trainee posts per annum – with wages set at National Living
Wage levels as would be required through these grant programmes
• Provide for employability income which covers c 90% of these wages costs – experience
to date indicates that it is realistic not to expect full cost recovery and consequently the
Business Plan assumes net costs (after employability income) to support these 4 posts
per annum of c£7000 per annum 
202

Page 203

35 
12. PREMISES AND RESOURCES 
ACDT currently lease office premises within the heart of Ardrossan which provide access to
excellent resources and are also expanding our operations by taking further occupancy of the
South Beach promenade within Ardrossan in the near future. 
12.1 Frank Sweeney Centre For Enterprise 
This is where we currently base our Development Officer and other core staff. This building 
measures in total at 7,675 sq. ft over two floors. The centre is based in an ideal town centre
location on Glasgow Street for ACDT to operate out of and consult with the local population
and our members. 
The office space that ACDT occupy within this building measures is over 600sq ft. These
Office premises have been secured by ACDT on a three-year lease starting April 1st 2022 –
with the Trust having negotiated a peppercorn rent of £1.00 per annum with local landlord
Cunninghame Housing Association for the duration of the lease. These premises allow ACDT
to gain access to modest office space, state of the art meeting room facilities, common areas
and off street car parking facilities from 7am to 10pm on weekdays. In addition ACDT’s lease
is fully inclusive of rates, heat and light charges, office cleaning, buildings insurance and
commercial refuse collection charges – reflecting the significant developmental support
provided by CHA to the Trust. 
The office space is used as an organisational base from 9am – 5pm during its weekly opening
hours. Furthermore ACDT currently utilise the 2 large meeting/training rooms which can be
used flexibly for a range of purposes from board meetings, training sessions, seminars,
conferences and workshops. When opened together into one space the rooms can host up to
100 people theatre style for community events. 
The Centre has a large reception space with 3 adjacent communally available interview rooms
for tenants to use as and when required. The facility is also fully accessible and DDA compliant
with lifts installed to maximise free movement around the building. ACDT have access to a
large, shared kitchen area providing canteen facilities for staff and catering facilities for
meetings, training, and events. 
12.2 South Beach Promenade 
ACDT are currently in negotiations with North Ayrshire Council on a 25-year lease on an area
of land at the South Beach Promenade in Ardrossan. This lease will enable ACDT to act on
previously developed community consultation information that highlights the need to further
develop the local infrastructure in the Ardrossan area to benefit the lives and leisure facilities
for Ardrossan’s local residents and ACDT trust members. The Trust have already secured a
substantial amount of capital grant funding and aim to secure a lease on the area before
developing new facilities on the site including a coffee shop, a new crazy golf course, playpark
and beach huts. 
These will complement the existing resources which ACDT currently operate on this site –
namely a 2x6 metre container that is split into 2 sections with 1 section being a small office
space and the other being storage space for our disability Wheelers, Hippocamps and
Deckchairs which can be rented by the public. The container has external advertising
promoting the project to passers-by and the general public. This facilities operating 
times/periods are May – September between 11 am and 6pm and available for groups at all
times via e mail application.
203

Page 204

36 
13. RISK ANALYSIS 
Following a range of important development work during 2021 and 2022 ACDT has now
established significant momentum and has begun to assemble and manage significant capital
and revenue funding; employ full time and temporary staff; take on leases with CHA and North
Ayrshire Council; will shortly undertake a procurement exercise prior to entering into contracts
with main constructor contractors; and will be responsible for the subsequent operational
management of important new facilities at South Beach. 
As part of its approach to governance the ACDT Board have identified a number of key risk
set out in the table below – together with actions planned to mitigate these. 
Using these as an initial platform, an organisational risk register will be developed and
maintained going forward by the Community Development Officer with regular updates
provided to enable the ACDT Board meetings to review risks and the measures in place at
Board meetings. 
Risk Description Mitigating Actions
Reputational Risk: Cost
inflation may increase scale
of capital funding which
ACDT need to secure to
deliver on community
aspirations re playpark and
other facilities at South
Beach 
● Lottery, RCGF and NAC funding already in place
● Maintaining effective working relationships with key
funders and partners including Lottery, Scot Govt and
NAC – keeping them up to date
● In principle agreements in place with Lottery and RCGF
regarding potential for ACDT to approach them for top
up capital funding once tender exercises have
established final costs.
● Potential for cost savings exercises to be undertaken in
consultation with Design Team and funders if required 
Financial Risk : Potential for
contractual delays and
potential cost overruns 
● Detailed cost plans produced by Design Teams include
provision for contingencies and price increase 
● Regular progress meetings will take place between
project team including ACDT representatives, Design
Team and contractors to identify issues early and agree
and implement solutions 
● Design Team will produce frequent valuations/cost
reporting and variations checking – with resultant
feedback to identify and agree cost control measures
and early remedial actions 
Financial Risk: Failure to
meet income and funding
targets required to sustain
ACDT business model 
● 5 year income and expenditure projections based on
clear assumptions and realistic targets to be adopted by
ACDT Board in late 2022 – to be updated annually based
on actual income and expenditure from previous year.
● Business Plan to ensure dedicated Community
Development Officer post built into expenditure
projections and grant funding sought for this post to
ensure ACDT has staff capacity to deliver Business Plan
● Ensure effective marketing and promotion of ACDT and
its services and facilities using range of mediums
including social media and community networks
● Ensure continued development of a strong identity and
brand for ACDT, recognition within local community and
204

Page 205

37 
maintain effective relationships with potential funders
and stakeholders such as NAC and CHA
● Ensure effective financial monitoring in place by staff and
Board of progress in relation to income and expenditure
targets within Business Plan 
Reputational and Financial
Risk: Failure to deliver
activities and outcomes
within funding bids and
Business Plan as agreed
with funders. Management
of disparate funding sources
requires compliance with
associated conditions of
grant
● Ensure clear and shared understanding amongst Board
and staff of terms and conditions of funding and funder
expectations
● Put in place effective project monitoring framework to
track progress against targets and ensure variations are
reported to the Board timeously
● Maintain effective reporting procedures and
management relationships with funders to enable
effective discussion and resolution of potential issues
Business Risk: Increasingly
competitive funding
environment for future
revenue monies to extend
key staff contracts, leading
to loss of core staff 
● Effective relationships developed with key funding
intermediaries e.g. CEiS to secure funding to sustain and
develop ACDT organisational capacity over next 3 years
● Consistent scanning of funding environment to be
undertaken by Community Development Officer to
identify new potential funding streams as they arise
● ACDT Board will ensure projects and funding bids
designed and developed in close alignment with
strategies of key local agencies and that outputs would
make direct contribution to funder targets 
Business Risk: Continual
need to sustain active and
healthy Board of Trustees,
with diverse range of
skillsets and experience to
effectively lead the
organisation
● Carry out organisational health check and Board skills
and training needs analysis to identify development
needs and potential gaps.
● Ensure resources available to support Board learning
and development programme and ensure ACDT make
most of resources available from sector membership
bodies such as DTAS and Social Enterprise Scotland
● As and when necessary activity advertise and recruit for
Board members to address identified skills gaps and/or
maintain effective Boar representation 
Reputational Risk : Adverse
media publicity impacts on
ACDT standing and profile
within community
● ACTD Board and staff to continue to hold communication
and consultation events with ACDT members and
Ardrossan residents to provide feedback on progress,
new ideas and establish ongoing priorities
● Continued effective use of social media and website to
manage ACDT’s profile within community, promote
positive messaging, celebrate successes and highlight
partnership working 
205

Page 206

38 
14. FINANCIAL PROJECTIONS 
ACDT have worked to secure major capital funding to deliver the play park facility, the
redevelopment of the toilet block at South Beach into a café and the installation of a range of
other facilities including beach huts, disabled wheelers, deckchairs and crazy golf.  This final
section of the Plan outlines the indicative capital costs associated with the project and the
proposed funding package. 
ACDT is now moving to a new stage in its development: 
• Town centre premises have been secured;
• A staffing structure is now in place; 
• A lease on the site at South Beach promenade is being finalised with North Ayrshire
Council to enable works on a major capital project to begin which will create new
facilities and income and expenditure streams for ACDT 
This section, therefore, also sets out 5-year financial projections based on key assumptions
on staffing, premises and overhead cost projections and the anticipated trading, contract and
grant funding income necessary to sustain the organisation over this period. 
14.1 Capital Project Funding and Finance 
Based on the most recent cost plans produced by Mike Hyatt Associates (playpark facility)
and TCS Construction Consultants (toilet block conversion and beach huts), the table below
summarises the projected capital costs for these developments. 
Expenditure Item Cost as per
Cost Plans
Play Park Construction  £285,100.00
Play Park Consultancy Fees £ 30,641.63
Toilet Block Rebuild including  Consultancy Fees  £759,216.37
TOTAL COST £1,074,958.00 
The associated capital funding package is also set out in the table below. 
Funder Funding Sought Status
National Lottery Our Place Programme     £274,542.00 Secured
Scottish Government Regeneration
Capital Grant Fund        
£748,000.00  Secured
North Ayrshire Council     £52,416.00 Secured
Total £1,074,958.00 
At the time of writing, in February 2023, ACDT have received tender responses in relation to
the playpark and await tender responses in relation to the toilet block rebuild. Discussions are
also underway with key funders – the National Lottery, Scottish Government Regeneration
Capital Grant Fund and North Ayrshire Council – regarding the potential to access additional
capita funding.  Following receipt of tender responses for the Playpark, the National Lottery
agreed an additional 10% over the initial funding agreed due to material price increases
caused by the pandemic and the war in Ukraine. Tender responses in relation to the toilet
block rebuild may also require to be reviewed with  ACDT working with funders to secure
additional funding where possible and with the Design Teams to value engineer if required to
ensure project delivery. This process could therefore lead to further revisions in the anticipated
costs and associated funding package shown above. 
206

Page 207

39 
14.2 Operating Income and Expenditure Summary and Commentary 
5 year operational income and expenditure projections from April 23 are summarised below –
with a full set of assumptions and an operational cash flow set out in a separate reference
document to this Plan. The projections identify income and expenditure associated with the
Core Team and the operation of the Playpark and South Beach projects. (Please note: these
projections do not include capital expenditure or income associated with the Playpark
installation or South Beach Works which are funded from a mixture of National Lottery, Scottish
Government Regeneration Capital Grant Fund and North Ayrshire Council monies. The capital
expenditure and income associated with this are however shown in our 23/24 Cash Flow.) 
Overall our main income source over the Plan period will be grant income, which is consistent
with ACDT’s aim and purpose and anticipated charitable status. Grant income – including
employability grants to support temporary employees - is expected to contribute c86% of
overall income in Year 1 dropping to 72% in Year 5 as income generation from the South
Beach project grows. 
Grant income has already been secured towards the Development Officer post until late 2023
whilst the Service Level Agreement contract income secured from CHA to manage the
Sweeney Centre contributes significantly towards our Receptionist costs. Additional but as yet
unidentified grant income with be required of £15,000 in Year 1. Positive approaches have
already been made to CEiS, who manage the Scottish Government’s Strengthening
Communities Fund to secure grant funding of c£35,000 pa to support extensions of the posts
from Year 2 to 4, before further grant funding of c£30,000 will be required in Year 5. 
ACDT has worked successfully to date with North Ayrshire Council Employability Service to
secure grant funding to support paid employability opportunities and this is expected to
continue over the duration of the plan – whether this be from local or national employability
programmes, with income assumptions based on current contribution levels with annual uplifts
to reflect associated wage cost increases and based on the New National Living Wage from
April 23. 
We have also had excellent development support from Cunninghame Housing Association for
a number of years, reflected not only in rent free premises within the Frank Sweeney Centre
but also in terms of recent discussions for an annual financial contribution of £10,000 shown
in the projections from Year 1 onwards. 
In terms of income generation, this will come on stream following the completion of the
installation of all of the facilities at South Beach. In Year 1 beach hut, crazy golf, cafe rental
and events income is estimated to contribute just under £20,000 before growing to almost
£49,000 by year 5 as the site becomes established and visitor numbers and usage increases.
We believe realistic hire rates have been assumed for our beach huts, with the hire season
running for no more than 30 weeks. 
Our intention is to lease the café within the hub building on the beach front to a local community
organisation with experience in this area to operate – generating a steady rental income of
c£8-9000 per annum from Year 2. South Beach is an attractive open space which has and will
continue to offer the potential to host a series of events including a fairground and music
events. We have made prudent assumptions about the level of income – ranging from £6000
in Year 1 to £8000 in Year 5 – which can be generated from the hire of the space/site to event
organisers but believe this can be exceeded. Finally as part of the negotiations with North
Ayrshire Council to conclude the lease for the South Beach site, ACDT have agreed to keep
the toilet block at South Beach open to the public for the period April to July 2023 until
demolition works commence to enable construction of the new facility. NAC have agreed to
207

Page 208

40 
make a funding contribution over this period equivalent to the costs incurred by ACDT to
subcontract this to an appropriate maintenance company. 
Staffing costs will, by some distance, be our largest cost category over the plan period –
accounting for 88% of costs in Year 1 before dropping slightly to 85% by Year 5. ACDT
overhead costs are reduced significantly due to the provision by Cunninghame Housing
Association of office, meeting and training space at a nominal charge. Based on consultation
with the local authority we have made provision for a lease payment for the site at South
Beach, based on a value estimated as a percentage of the rateable value of the site. Given
recent fuel cost hikes we have also made a growing annual provision for utility bills at South
Beach with sizeable stepped increased in Years 2 and 3 before lower increases kick in in
Years 4 and 5. As the South Beach project comes on stream in 2023 we have provided for
additional insurance provision, telephone and IT costs and a budget amounting to £13500
over 3 years (Yrs 3 to 5) for repair and maintenance of South Beach premises and equipment
following the end of defects liability and manufacturer warranty periods 
As part of our core activities we expect to continue to carry out a range of community
engagement and survey work with local residents and groups as we identify priorities, seek
feedback and develop projects. Often we will be able to secure grant funding to support this
activity but to be prudent we have also provided for £6000 of expenditure within our planned
budget in Years 2 and 4 to help support this activity. 
Based on these assumptions, we are budgeting for small annual surpluses across the Plan
period to provide us with the ability to accumulate appropriate levels of reserves for
contingency and organisational development purposes. 
208

Page 209

41 
Ardrossan Community Development Trust Income and Expenditure Projections
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
INCOME 23/24 24/25 25/26 26/27 27/28
Core Team Income
CIF Grant Funding -Development Officer £27,725 £0 £0 £0 £0
Strengthening Communities - Staff Costs £0 £35,000 £35,000 £35,000 £0
CHA Grant Funding £10,000 £10,000 £10,000 £10,000 £10,000
Other Grant Funding £15,000 £0 £0 £0 £30,000
SLA income £17,000 £17,510 £18,035 £18,576 £19,134
Employability Grant £56,000 £58,800 £61,740 £63,592 £65,500
£125,725 £121,310 £124,775 £127,169 £124,634
South Beach Project Income
Beach Hut Hire £5,940 £15,750 £16,650 £18,000 £18,150
Crazy Golf Hire £5,720 £9,724 £10,696 £11,766 £12,943
Café Lease £2,100 £8,400 £9,600 £9,600 £9,600
Events Income £6,000 £6,000 £7,000 £8,000 £8,000
NAC Funding - Toilet Block Servicing £6,000 £0 £0 £0 £0
£25,760 £39,874 £43,946 £47,366 £48,693
TOTAL INCOME £151,485 £161,184 £168,722 £174,535 £173,326
EXPENDITURE
Core Team Expenditure
Staffing Costs
Development Officer £37,170 £39,029 £40,590 £41,807 £43,062
Receptionist £24,780 £25,771 £26,544 £27,341 £28,161
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
Volunteers Expenses £500 £500 £500 £500 £500
£93,877 £98,298 £101,952 £104,996 £108,130
Premises and Overhead Costs
Rent and Rates £300 £306 £312 £318 £325
Insurance £1,700 £1,751 £1,804 £1,858 £1,913
Heat and Light £0 £0 £0 £0 £0
Refuse and Waste Collection £0 £0 £0 £0 £0
Telephone / IT £0 £0 £0 £0 £0
Hardware and Software £1,500 £500 £1,250 £500 £1,250
Printing, Stationery & Office Supplies £750 £773 £796 £820 £844
Premises & Equipment Repair and Maintenance £0 £0 £0 £0 £0
Cleaning and Cleaning Supplies £0 £0 £0 £0 £0
Advertising & Marketing £1,000 £500 £500 £500 £500
Accountancy and Audit £1,500 £1,545 £1,591 £1,639 £1,688
Bank Charges £250 £258 £265 £273 £281
Professional Fees including Legal Costs £2,500 £2,575 £2,652 £2,732 £2,814
Subscriptions £750 £773 £796 £820 £844
Training and Development £600 £800 £800 £800 £800
Health and Safety £500 £515 £530 £546 £563
Event Costs £1,000 £1,000 £1,500 £1,500 £1,500
Community Consultation/Survey Costs £0 £3,000 £0 £3,000 £0
Sundry Costs £500 £515 £530 £546 £563
£12,850 £14,810 £13,327 £15,852 £13,885
South Beach Project Expenditure
Staffing Costs
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
£31,427 £32,998 £34,318 £35,348 £36,408
Premises and Overhead Costs
Rent and Rates £900 £909 £918 £928 £938
Insurance £890 £917 £944 £973 £1,002
Heat and Light £2,000 £3,000 £3,750 £4,125 £4,538
Telephone / IT £720 £720 £742 £742 £742
Premises & Equipment Repair and Maintenance £0 £0 £4,500 £4,500 £4,500
South Beach Toilet Servicing £6,000 £0 £0 £0 £0
£10,510 £5,546 £10,854 £11,267 £11,718
TOTAL EXPENDITURE £148,663 £151,651 £160,451 £167,462 £170,142
ANNUAL SURPLUS / DEFICIT £2,822 £9,533 £8,271 £7,073 £3,184
CUMULATIVE POSITION £2,822 £12,355 £20,626 £27,698 £30,882
209

Page 210

42 
Appendix 1 ACDT Board of Trustees – Summary Profiles 
Scott Mould – Chairperson ACDT 
Scott moved from Glasgow to Ardrossan in the early noughties and immediately made it his
home. Family commitments seen Scott move back to Glasgow late 2021 however he still
works & volunteers in the Town and is planning a return in the coming years.  With a lifetimes
experience in retail management, as an entrepreneur and experience in marketing Scott set
up two local businesses. Scott is now Head of Social and Economic Development with a local
Housing Association as well as acting as Operations Manager for the Association’s furniture
re-use social enterprise. Scott  was also a Director of Ardrossan Community Sports Hub SCIO,
and played an integral role in creating a new community asset by developing a new community
gym within Ardrossan. In his current role as Gym Lead Scott takes  a key role in helping the
organisation sustain and develop this asset and in securing its future.   
Christine Powell – Company Secretary / Vice Chair 
Christine has lived most of her life in Ardrossan, aside from a short period in Saltcoats and
worked in Saltcoats Jobcentre for 35 years from the age of 17 and left after a period of critical
illness. Christine is now a training manager working to train people in ASN childcare and has
helped create several local companies to assist the local economy. Christine and her husband
set up home back in Ardrossan and created the Neighbourhood Watch Scheme for the area
and then progressed into a Resident and Tenants Association. 
Hugh Delahunt – Secretary 
Hugh joined the Board at our AGM in 2022 and is a 59 year old Senior Project Manager and
former Senior Site Engineer employed in large Rail Engineering projects and has worked
around the UK in this field for some 23 years. Prior to that he obtained degrees in both Civil
Engineering and Construction Management from Glasgow Caledonian University after
returning to academic studies in his late thirties after various jobs in transport and construction.
He resides in Ardrossan on South Beach and has a keen interest in the potential for upgrades
to the community areas around the town. 
Steven Higgins – Treasurer 
Steven lives in Ardrossan with his family and is the Co-Founder of award winning PowerTek
Utilities and E&S Utilities. Under his leadership they have grown rapidly and employ over 100
people. Steve is committed to helping to deliver a net-zero carbon future. 
For years Steven has been involved in the construction of renewable projects from single wind
turbines to large scale wind farms as well as hydro and solar farms. Steven is also an early
pioneer in the build out of electrical vehicle (EV) charging infrastructure across the UK. Steven
brings a depth of business management to the Trust that will serve it well in the years to come. 
Viki Powell - Director 
Viki was nominated to the Trust Board in June 2021. She moved from Saltcoats to Ardrossan
at the age of two with her parents who set up a local Neighbourhood Watch scheme in
Ardrossan; and later the Residents and Tenants Association. Viki grew up with a strong sense
210

Page 211

43 
of local community and empowerment and as an adult has become more and more involved
in community activities and projects and now wants to have a more direct impact in
Ardrossan’s growth and future. She is passionate about her Town, its shorefront and stunning
views to Arran and Ailsa Craig. 
June Strang -  Director 
June joined the Board of the Trust on 30th June 2021.June was born in Glasgow, and as most
Glaswegians do came to the coast during the Glasgow fair before moving to Saltcoats and
then Ardrossan at the age of 14 age  which has been her home ever since. Aspiring to be
active in making Ardrossan a better place to live, June followed the Ardrossan Town Centre
Initiative (ATCI) and then became a member of Ardrossan Community Development Trust
(ACDT) to get involved in a totally new experience making Ardrossan a better place for
residents and visitors alike. June looks forward to continuing the work already started by the
Trust and get actively involved to further develop and progress the communities’ ideas. 
Elizabeth Hardie - Director 
Elizabeth joined the Board of the Trust on 30th June 2021. A local resident all her life, Elizabeth
left school and, amongst other things, worked at Abbotsford Nursing Home in the Town for 10
years as a cook. Elizabeth has also been heavily involved in the operation of the Whitlees
Centre for many years and was also the café cook for 3 years before retiring. She is inspired
in her retirement to continue to assist at the Whitlees Centre and helps out wherever she can.
After learning of the Community Development Trust, their engagement with the community
and plans to raise funds and develop Ardrossan for its residents and visitors she had to get
involved. 
Julia Gray – Director 
Julia joined the Board of the Trust on 30th June 2021. Julia was born and brought up in
Ardrossan and was educated at Stanley Primary School and Ardrossan Academy. After
leaving school she spent 22 years working in McLaren Nursery followed by a few years in
retail before going into the care sector. Julia has been involved in the Whitlees Community
Centre since 2014 initiating huge improvements in what the Centre delivered for Ardrossan
and its local community and she is still heavily involved in the activities of the centre to this
day. Aside from this Julia is also a mother of 3 and is involved in other local community groups.
Julia is passionate about her Town and it’s future, helping its residents wherever she can
ensuring that local residents are at the heart of change and have their voice. 
Marisa Stevenson - Director 
Marisa joined the Board of the Trust on 30th June 2021.Marisa’s family has always been born
and bred in Ardrossan and apart from her living for 5 years as a ‘Doonhamer’ in Dumfries in
the late eighties she has always lived here. She is a Nurse Lecturer at the University of The
West of Scotland responsible for teaching Post graduate Specialist Community Health Nurses
from all over the United Kingdom. Marisa also has a strong sense of Community and is
passionate about the Town, in particular the Shore front and the Cannon Hill. 
211

Page 212

44 
Michael McCulloch – Director 
Having lived in Ardrossan all of his life, Michael has spent the last 2 years in Saltcoats. Michael
spent all his childhood and early adulthood in Princes St, right in the heart of the Town, with
South Beach, down the “inches” and Ardrossan harbour as his playgrounds and remembers
Ardrossan as a busy place “full of life” and a great place to live. Having served his
apprenticeship in engineering with ICI in Stevenston, Michael went on to work in many
engineering projects at home and away before expanding his career into Social Services.
Michael has always been involved in local groups and issues of importance and was involved
in the successful campaign to keep the Arran Ferry sailing from Ardrossan. Having a great
interest in local history he is a trustee of the Castle Heritage Society.
212

Page 213

1 
Ardrossan Community Development Trust
Business Plan 
Appendix 
5 Year Financial Projections 
213

Page 214

2 
Ardrossan Community Development Trust Income and Expenditure Projections
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
INCOME 23/24 24/25 25/26 26/27 27/28
Core Team Income
CIF Grant Funding -Development Officer £27,725 £0 £0 £0 £0
Strengthening Communities - Staff Costs £0 £35,000 £35,000 £35,000 £0
CHA Grant Funding £10,000 £10,000 £10,000 £10,000 £10,000
Other Grant Funding £15,000 £0 £0 £0 £30,000
SLA income £17,000 £17,510 £18,035 £18,576 £19,134
Employability Grant £56,000 £58,800 £61,740 £63,592 £65,500
£125,725 £121,310 £124,775 £127,169 £124,634
South Beach Project Income
Beach Hut Hire £5,940 £15,750 £16,650 £18,000 £18,150
Crazy Golf Hire £5,720 £9,724 £10,696 £11,766 £12,943
Café Lease £2,100 £8,400 £9,600 £9,600 £9,600
Events Income £6,000 £6,000 £7,000 £8,000 £8,000
NAC Funding - Toilet Block Servicing £6,000 £0 £0 £0 £0
£25,760 £39,874 £43,946 £47,366 £48,693
TOTAL INCOME £151,485 £161,184 £168,722 £174,535 £173,326
EXPENDITURE
Core Team Expenditure
Staffing Costs
Development Officer £37,170 £39,029 £40,590 £41,807 £43,062
Receptionist £24,780 £25,771 £26,544 £27,341 £28,161
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
Volunteers Expenses £500 £500 £500 £500 £500
£93,877 £98,298 £101,952 £104,996 £108,130
Premises and Overhead Costs
Rent and Rates £300 £306 £312 £318 £325
Insurance £1,700 £1,751 £1,804 £1,858 £1,913
Heat and Light £0 £0 £0 £0 £0
Refuse and Waste Collection £0 £0 £0 £0 £0
Telephone / IT £0 £0 £0 £0 £0
Hardware and Software £1,500 £500 £1,250 £500 £1,250
Printing, Stationery & Office Supplies £750 £773 £796 £820 £844
Premises & Equipment Repair and Maintenance £0 £0 £0 £0 £0
Cleaning and Cleaning Supplies £0 £0 £0 £0 £0
Advertising & Marketing £1,000 £500 £500 £500 £500
Accountancy and Audit £1,500 £1,545 £1,591 £1,639 £1,688
Bank Charges £250 £258 £265 £273 £281
Professional Fees including Legal Costs £2,500 £2,575 £2,652 £2,732 £2,814
Subscriptions £750 £773 £796 £820 £844
Training and Development £600 £800 £800 £800 £800
Health and Safety £500 £515 £530 £546 £563
Event Costs £1,000 £1,000 £1,500 £1,500 £1,500
Community Consultation/Survey Costs £0 £3,000 £0 £3,000 £0
Sundry Costs £500 £515 £530 £546 £563
£12,850 £14,810 £13,327 £15,852 £13,885
South Beach Project Expenditure
Staffing Costs
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
£31,427 £32,998 £34,318 £35,348 £36,408
Premises and Overhead Costs
Rent and Rates £900 £909 £918 £928 £938
Insurance £890 £917 £944 £973 £1,002
Heat and Light £2,000 £3,000 £3,750 £4,125 £4,538
Telephone / IT £720 £720 £742 £742 £742
Premises & Equipment Repair and Maintenance £0 £0 £4,500 £4,500 £4,500
South Beach Toilet Servicing £6,000 £0 £0 £0 £0
£10,510 £5,546 £10,854 £11,267 £11,718
TOTAL EXPENDITURE £148,663 £151,651 £160,451 £167,462 £170,142
ANNUAL SURPLUS / DEFICIT £2,822 £9,533 £8,271 £7,073 £3,184
CUMULATIVE POSITION £2,822 £12,355 £20,626 £27,698 £30,882
214

Page 215

3 
Ardrossan Community Development Trust Operational Income Projections
Core Team Income
Grant Funding - Staff
Staff Funding
Employability Funding  - Trainees
Grant Income Summary for Core Staff Costs YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
CIF Grant Funding - Development Officer £27,725 £0 £0 £0 £0
Strengthening Communities Grant  Staff Costs £0 £35,000 £35,000 £35,000
Service Level Agreement Income £17,000 £17,510 £18,035 £18,576 £19,134
CHA Grant Funding £10,000 £10,000 £10,000 £10,000 £10,000
Other Grant Funding £15,000 £0 £0 £0 £30,000
£56,000 £58,800 £61,740 £63,592 £65,500
Wage Recovery Rate  Increase Per Annum 5% 4% 3% 3%
South Beach Project Income
Beach Hut Hire
Employability Grant
These assumptions set out anticipated revenue income sources for the core operation of Ardrossan Community Development Trust 
and its premises at the Frank Sweeney Centre, Glasgow Street, Ardrossan and the operation of the South Beach promenade facilities.
Capital and income expenditure assumptions for the South Beach Project are not included as these will be funded separately via
Lottery Funds, Scottish Government RCGF amd North Ayrshire Council with the intention being that these are delivered at zero net
cost to ACDT. The capital income and expenditure for these will be shown in the Yr 1 cash flow.
ACDT secured NAC Community Investment Fund monies of £53100 for 100% of salary costs of a Development Manager for 18
months beginning in June 2022. Based on expected 22/23 salary commitments we anticipate that £27725 will be available to
support the posts in 2023/2024. ACDT have been approached by CEIS to bid for Strenghtneing Communities Funding from Aprul 24
onwards with up to £40k pa available for 3 years.  This is is expected to be successful to support Staffing Costs from Yrs 2 to 4 - we
have assumed a £35k pa contribution   An amount of as yet unidentified grant funding has been provided for in Year 1 and 5 of £15k
and £30k respectively - we believe this to be realistic given ACDT's track record in securing funding and given expected charitable
status with applications to programmes such as Investing in Communities, the Lottery, Trust Funders and other local and national
sources to be submitted for ongoing grant support for Staff Costs as necessary.
CHA pay service level agreement income to ACDT to manage the Frank Sweeney Centre of £17000 per annum - assume this increases
at 3% per annum over 5 year period. ACDT also expect to secure an annual Grant contribution of £10,000 from CHA.
ACDT  plan to host 4 paid trainee posts annually paid for by Employability Funding available through local/national programmes.
Each placements will be for 26 weeks. The wage recovery rate (employability grant) shown below for NAC Long Term Unemployed
Grant programme for 22/23 was £10000 per post over 26 weeks. However it is uncertain whether this will be replicated. For the
purpose of this Plan we have assumed a figures of £14000 across 52 weeks per post for Year 1 . Thereafter Employability income per
placement is assumed to rise in parallel with the associated wage increases for these posts assumed within the expenditure
projections
The South Beach Promenade will provide beach huts for hire by local traders. The table below shows projections for the no of huts,
no of weeks hire per annum and weekly hire cost.
One of the 6 huts will be used to support electric bike charging and cycle parking to provide a maintenance/repair hut and will not
therefore generate any income.
215

Page 216

4  
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
No of Huts 5 5 5 5 5
No of weeks hire per annum 12 30 30 30 30
Weekly Hire Cost £99 £105 £111 £120 £121
Total Income from Beach Hut Hire £5,940 £15,750 £16,650 £18,000 £18,150
Year 1 12 weeks 10% increase
Rental from 1st August to 28th October 23
£16.50 daily rate x 6 days weekly
Year 2 30 weeks
Rental from 1st April to 28th October 24
£17.50 daily rate x 6 days weekly
Year 3 30 weeks
Rental from 31st March to 27th October 25
£18.50 daily rate x 6 days weekly
Year 4 30 weeks
Rental from 30th March to 26th October 26
£20.00 daily rate x 6 days weekly
Year 5 30 weeks
Rental from 30th March to 26th October 26
£20.00 daily rate x 6 days weekly
Free access 2 weeks pre-Xmas
Crazy Golf Hire
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
April - June Hire Number of Days 6 6 6 6
Number of Rounds 22 24 27 29
Cost Per Round 2£                  2£                2£                    2£                    
Number of Weeks 13 13 13 13
Total Income £3,432 £3,775 £4,153 £4,568
July - Sept Hire Number of Days 6 6 6 6 6
Number of Rounds 30 33 36 40 44
Cost Per Round 2£                     2£                  2£                2£                    2£                    
Number of Weeks 13 13 13 13 13
Total Income £4,680 £5,148 £5,663 £6,229 £6,852
Oct - Mar Hire Number of Days 2 2 2 2 2
Number of Rounds 10 11 12 13 15
Cost Per Round 2£                     2£                  2£                2£                    2£                    
Number of Weeks 26 26 26 26 26
Total Income £1,040 £1,144 £1,258 £1,384 £1,523
Total Income £5,720 £9,724 £10,696 £11,766 £12,943
Crazy golf will be provided with hire of clubs and access to course at £2 per round.  It is anticipated this will be busier during better
weather. Estimates are based on 12 months income with July to September being the peak period followed by April to June and
limited income over the winter. Assumed Crazy Golf hire will not proceed until July 23 due to installation works on South Beach
216

Page 217

5 
Café Lease
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Amount Per Month £700 £700 £800 £800 £800
Number of Months 3 12 12 12 12
Café rental income £2,100 £8,400 £9,600 £9,600 £9,600
Events Income
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Events Income £6,000 £6,000 £7,000 £8,000 £8,000
NAC Funding - Toilet Block Servicing
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
NAC Funding - Toilet Block Servicing £6,000 £0 £0 £0 £0
NAC will provide funding support to enable ACDT to assume responsibility for keeping the South Beach toilet block open over the
period April to May 23 until demolition works commence.
ACDT intend to lease the café on site at South Beach to a community partner / SME to operate. It is assumed this will generate
annual rental income as shown in the table below based on  Yrs 1 and 2 lease income of  £700/month rising to £800/month in Yrs
3,4 and 5 . In Year 1 it is assumed the cafe will be operational for only 3 months to allow for an initial rent free period.
ACDT will lease the South Beach promenade from North Ayrshire Council and will be able to generate net income (ie after costs)
hiring the site for a series of local events .  It is believed that c£4k per income is generated per annum from the annual fairground
which comes to the site during the summer. The plan also assumes additional events related income from Music events, Gala Days
events - with the table below outlining  anticipated income streams.
217

Page 218

6 
Ardrossan Community Development Trust Operational Expenditure Projections
Core Team Expenditure
Staff Costs
No. Staff No. Hrs No Wks
Wage
Rate Per
Hr
Sub Total
Per Annum
NI and
Pension@
18%
Total
Development Officer 1 35 52 £30,000 £5,400 £35,400
Receptionist 1 35 52 £20,000 £3,600 £23,600
Trainees Funded by Employability Grants 2 25 52 £10.42 £27,092 £4,335 £31,427
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Wage Increase Per Annum 5% 4% 3% 3%
Development Officer £37,170 £39,029 £40,590 £41,807 £43,062
Receptionist £24,780 £25,771 £26,544 £27,341 £28,161
Trainees Funded by Employability Grants £31,427 £32,998 £34,318 £35,348 £36,408
Volunteer Expenses
A nominal annual provision has been made   of £500
This is to cover out of pocket travel and subsistence expenses
Premises and Overhead Costs
Rent and Rates
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Rent and Rates £300 £306 £312 £318 £325
These assumptions set out anticipated revenue income sources for the core operation of Ardrossan Community Development Trust  and its
premises at the Frank Sweeney Centre, Glasgow Street, Ardrossan and the operation of the South Beach promenade facilities.
Capital and income expenditure assumptions for the South Beach Project are not included as these will be funded separately via Lottery Funds,
Scottish Government RCGF amd North Ayrshire Council with the intention being that these are delivered at zero net cost to ACDT. The capital
income and expenditure for these will be shown in the Yr 1 cash flow.
ACDT have a Development Officer in post to take forward the work of the organisation within the local community. The current annual salary for
the post is set out below together with assumed uplift per annum.
Training Opportunities
ACDT had an exisitng Trainee in 22/23 who will convert to Full Time Receptionist in April 2023. ACDT also aims to create paid employment and
training opportunities for local unemployed residents through local and natonal employability programmes, with 1 paid trainee posts assumed
each year of the Plan period. Assume 2 New trainees go through the post each year (ie Each Trainee gets 26 weeks). The wage rate for these post
is equivalent to the National Living Wage which for April 23 is £10.42. Grant income associated with these posts is set out within the Income
Assumptions Section.
ACDT lease office space from CHA in the Frank Sweeney Centre for Enterprise in Ardrossan. The annual cost of the combined rent and service
charge is £3404. However CHA provides this office space free of charge - as a result no expenditure provision for rent is required.
An  annual provision of £300 for water rates has also been assumed.  An annual uplift of 2% has been assumed.
ACDT is seeking charitable status and on this basis the Plan assumes 100% business rates relief.
CORE OPERATION STAFF COSTS
218

Page 219

7 
Insurance
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Insurance £1,700 £1,751 £1,804 £1,858 £1,913
Heat and Light
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Heat and Light £0 £0 £0 £0 £0
Refuse and Waste Collection
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Refuse and Waste Collection £0 £0 £0 £0 £0
Telephone / IT
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Telephone / IT £0 £0 £0 £0 £0
Hardware and Software
An initial sum in Yr 1 for PC's/laptop and  software for staff/ Committee has been assumed of £1,000
Further hardware provision has been assumed in Yr 3 and 5 of £750
Plus annual licence/mgt costs have been assumed of £500
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Laptop and Hardware £1,000 £750 £750
Annual Licence/Mgt Cost £500 £500 £500 £500 £500
Total £1,500 £500 £1,250 £500 £1,250
ACDT insurance provision for the core operation covers Management Liability & a combined Commercial Package. Previous costs for 2021/2022
were £896+714.03 = £1610.03. On this basis the estimated cost in Year 1 is £1700. Assume 3% uplift pa Yrs 2 to 5.
Utility Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service charge which forms the annual
rent costs. Therefore no annual provison is required.
Refuse and Waste Collection Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service charge
which forms the annual rent costs. Annual provision has been made within these projections of £0.
Telephone and IT Connectivity Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service charge
which forms the annual rent costs. Annual provision has been made within these projections of £0.
219

Page 220

8 
Printing, Stationery & Office Supplies
A nominal annual provision has been made  for these costs of £750
Assumption of 3% uplift provision per annum
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Printing & Stationery Etc £750 £773 £796 £820 £844
Premises & Equipment Repair and Maintenance
Building maintenance at the Frank Sweeney Centre is CHA's responsibility and part of the service charge.
ACDT only have a single office within the facility and limited equipment Annual Provison of £0
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Repair & Maintenance £0 £0 £0 £0 £0
Cleaning and Cleaning Supplies
Cleaning Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service
charge which forms the annual rent costs. Therefore no annual provision has been made within these projections
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Cleaning and  Supplies £0 £0 £0 £0 £0
Advertising & Marketing
In order to market and promote ACDT throughout the local community a sum has been provided for of £1,000
within these projections for Year 1. Further annual provision has been made of £500
These costs are assumed to include Website and other mediums and also provison for South Beach Project.
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Advertising & Marketing £1,000 £500 £500 £500 £500
Accountancy and Audit Fees
Annual provision for accountancy and audit costs - based on previously incurred levels for similar Third Sector Organisations
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Accountancy and Audit £1,500 £1,545 £1,591 £1,639 £1,688
220

Page 221

9 
Bank Charges
A nominal annual provision has been made  for these costs of £250
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Bank Charges £250 £258 £265 £273 £281
Professional Fees including Legal Costs
ACDT are likely to incur professional legal fees as the organisation is established and evolves
An annual provision of £2,500 has been assumed for this purpose
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Professional Fees £2,500 £2,575 £2,652 £2,732 £2,814
Subscriptions
ACDT will have membership fees and subscriptions for sector bodies in order to access information, good practice,
training and networking benefits. An annual provision of has been assumed for this purpose of £750
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Subscriptions £750 £773 £796 £820 £844
Training and Development
ACDT will want to provide access to training and development for all staff and Board Members.
An annual staff development allocation of £100 per staff member has been assumed
In additon an annual provision has been made for Committee development of £300
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
No. of  staff 3 5 5 5 5
Staff Development Provision £300 £500 £500 £500 £500
Committee Development Provision £300 £300 £300 £300 £300
Total Training and Development Provision £600 £800 £800 £800 £800
221

Page 222

10 
Health and Safety
A small annual provision for Health and Safety has been made of £500
This includes provision for the Frank Sweeney Centre and the South Beach promenade
Assume uplift of 3% per annum
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Health and Safety £500 £515 £530 £546 £563
Event Costs
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Event Costs £1,000 £1,000 £1,500 £1,500 £1,500
Community Consultation/Survey Costs
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Consultation £0 £3,000 £0 £3,000 £0
Sundry Costs
A nominal annual provision has been made  for these costs of £500
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Sundry Costs £500 £515 £530 £546 £563
South Beach Project Expenditure
No. Staff No. Hrs No Wks
Wage
Rate Per
Hr
Sub Total
Per Annum
NI
Pension@
18%
Total
2 Trainees Funded by Employability Grants 2 25 52 £10.42 £27,092 £4,335 £31,427
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Wage Increase Per Annum Yrs 2 to 5 5% 5% 4% 3% 3%
Trainees Funded by Employability Grants £31,427 £32,998 £34,318 £35,348 £36,408
As part of its core operation ACDT will run numerous local events ranging from community workshops and training to public meetings, AGMs,
project development sessions, local celebrations etc. Whilst specific funding may be able to be accessed for particular events, it is also felt to be
prudent to make a provision within the Plan for a general Events budget to draw on when specific funds are not available. The following
provisions have been made across Years 1 to 5.
ACDT will incur costs in running events at the South Beach Promenade. Within this Business Plan we have chosen to account for these by
providing a net income figure for Events Income for South Beach (ie Income = the profit after costs have been incurred).
ACDT anticipates ongoing consultation and communication with local residents and groups as part of its core work, supplemented by occasional
survey work to help establish, quantify  and evidence local needs, priorities and preferences. On that basis the following provisions have been
made to provide resources to support this activity - as set out below.
South Beach Staff Costs
222

Page 223

11 
Rent and Rates
ACDT will lease the promenade at South Beach from North Ayrshire Council. Indicative estimates suggest that the annual lease cost
for the site could b c10% of the rateable value of the land (c£6000). So annaul provision has been made of -  £600
It is assumed water rates will also required to be paid towards the toilet block/cafe on South Beach with the bill split with
the café operator. Assume ACDT share is £300 per annum
An annual uplift on water rates of 3% has been assumed
ACDT is seeking charitable status and on this basis the Plan assumes 100% business rates relief.
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Assumed Cost of Lease £600 £600 £600 £600 £600
Water Rates £300 £309 £318 £328 £338
Total £900 £909 £918 £928 £938
Insurance
Further public liability insurance will be required for the facilities on South Beach
The estimated cost for this in Year 1 is £890
Assume 3% uplift pa Yrs 2 to 5
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Insurance £890 £917 £944 £973 £1,002
Heat and Light
Annual provision has been assumed for Utilities costs associated with the South Beach and Playpark project of £2,000
This excludes the utilities associated with the operation of the café as these costs will be the responsibility of the operator.
Given the current fuel crisis assume 50% uplift Pa in Yr2, 25% in Yr 3 to 3 and reducing to 10% per annum in years 4 and 5
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Heat and Light £2,000 £3,000 £3,750 £4,125 £4,538
Telephone and IT
£720
This is equivalent to £60 per month. Assumption of 3% uplift in Yr 3
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Telephone and IT £720 £720 £742 £742 £742
An annual sum has been provided for to cover Mobile telephone lease/hire for the facilities at South Beach of
223

Page 224

12 
Premises & Equipment Repair and Maintenance
Playpark maintenance.  Assumed provision from Year 3 onwards  as warranty covers 1st 2 years.  £3,000
Annual Beach Huts, Deckchairs and Disabled Wheelers maintenance assumed to be £1,500
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Playpark Maintenance £3,000 £3,000 £3,000
Beach Hut Maintenance £1,500 £1,500 £1,500
Total £0 £0 £4,500 £4,500 £4,500
Cafe will be leased on basis of a fully insuring and repairing lease agreement - no expenditure
South Beach Toilet Servicing
ACDT will assume responsibility for keeping the South Beach toilet block open over the period April to
May 223 - until the works at South Beach commence and the toilets are demolished to makle way for
the new facility. A provision of £1500 month has been made for ACDT to sub contract servicing to a
maintenance/cleaning company
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
South Beach Toilet Servicing £6,000 £0 £0 £0 £0
224

Page 225

13 
225

Page 226

14 
226

Page 227

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet
Title: Home Office Asylum Dispersal
Purpose: To advise Cabinet of the Home Office’s plans for asylum
dispersal across the United Kingdom and highlight the potential
impact for North Ayrshire, taking into consideration the
humanitarian resettlement schemes already being supported. 
Recommendation: That Cabinet: 
i. notes the support being provided within North Ayrshire
across the various humanitarian resettlement schemes.
ii. notes the current pressure on Housing and wider services.
iii. notes the Home Office rollout of a ‘full dispersal’ model for
asylum seekers across the UK and the implications this
has for North Ayrshire.
iv. agrees that the Council is not in a position to offer social
rented housing as part of the wider dispersal programme.
v. approves the approach taken by Council officers to support
Mears with the asylum dispersal programme by working in
partnership through the North Ayrshire Refugee Task
Force. 
1. Executive Summary 
1.1.   North Ayrshire is currently supporting several humanitarian / resettlement programmes
in relation to the evacuation from Afghanistan, various Ukrainian visa routes,
Unaccompanied Asylum-Seeking Young People and the UK Resettlement Scheme
(Legacy of the Syrian Resettlement Scheme). 
1.2  Given the extreme pressure on asylum accommodation in the south of England
resulting from the significant and sustained increase in asylum arrivals, the Home
Office has redesigned its long-term approach for the asylum dispersal programme. The
‘full dispersal’ model includes regional/ national asylum seeker allocations, aligned to
their UK population share. 
1.3 Based on assumed UK arrivals of 100,000 by December 2023, the population share for
Scotland amounts to 9,000 asylum seekers, with the allocation for North Ayrshire being
111 arrivals to be accommodated over a two-year period. However, it should be noted
that the number of asylum seekers arriving in the UK on an annual basis is continuing
to grow, which means the North Ayrshire share is subject to change. 
1.4 The dispersal of asylum seekers across North Ayrshire will have significant implications
Agenda Item 12
227

Page 228

in relation to housing, health, education and other support services, alongside staffing
and financial resources. 
2. Background 
2.1 A letter from the Minister for Safe and Legal Migration, Kevin Foster MP, was sent to all
local authorities in April 2022 informing councils of changes being made to the asylum
system in order to move away from the use of temporary contingency accommodation
for asylum applicants.  This change is intended to ensure a fairer distribution model is
utilised across the country; this new approach is being described as ‘full dispersal’. 
2.2 All local authority areas in England, Scotland and Wales will participate in the new
system of full dispersal to allow the move from hotels to more suitable dispersed
accommodation. 
2.3 The Mears Group have been contracted by the Home Office to implement and support
the UK dispersal programme in Scotland. The proposed approach will require them to
work in partnership with councils, under the auspices of the national Asylum
Partnership Board, to identify suitable accommodation and deliver on the full dispersal
plans. 
2.4 For over twenty years Glasgow City Council has - both directly and indirectly -
supported asylum dispersal in the city. It remains, by a considerable margin, the largest
host authority for asylum applicants in the UK, with well over 5,000 people currently
being accommodated in the city. The Home Office and Mears commenced an initial
phase of widening dispersal to councils neighbouring Glasgow during Summer 2022. 
2.5 In November 2022 COSLA Leaders agreed that any widening of dispersal would need
to take place across all 32 local authorities on a proportional and equitable basis. 
2.6 This approach will allocate a proportionate share of the additional c. 4,000 bed spaces
that the Home Office has allocated for Scotland across 31 councils. This is on the basis
that Glasgow already has a disproportionate share of asylum applicants, reflecting its
position as the largest dispersal authority in the UK. 
2.7 The North Ayrshire share based on the proportion of the population, discounting
Glasgow, is 2.78%; this amounts to 111 asylum seekers arriving over a two-year
period. 
2.8 The roll out pertains to asylum seekers who have been assessed as having grounds to
make an asylum application, with temporary provision being made for up to 18 months
whilst the asylum process is undertaken. Should an asylum seeker’s application be
approved, they will be awarded the status of refugee, giving them the right to remain in
the country and to access housing and welfare benefits. 
The impact of asylum dispersal on local authorities 
2.9 Mears, as the Home Office contractor, is responsible for procuring accommodation. 
They are required to work in partnership with local authorities to ensure that they
understand the local area including regeneration regions, particular characteristics of a
neighbourhood, service provision across the local authority, areas of challenge, suitable
properties for procurement and possible opportunities within registered social landlord
228

Page 229

and local authority housing stock that are underutilised. 
2.10 Mears mainly procure private rental accommodation; however they are interested in
any other options available in a local area including hotels, care homes and buildings
which can be reprovisioned. 
2.11 As Mears identifies properties for procurement, they will liaise with both the local
authority and Police Scotland, as part of the procurement protocol which needs to be
followed for each property. 
2.12 Mears has already commenced procurement activity in some council areas, as well as
operating ‘contingency accommodation’ (hotels) in Perth and Kinross, Falkirk,
Edinburgh, Renfrewshire, Glasgow, Inverclyde and South Lanarkshire. 
2.13 Mears has confirmed that there are currently 6,000 asylum seekers within the Scottish
system and they have already secured 79 bedspaces of their 2,500 Scottish target for
the calendar year 2023. They have a further 250 units in the development pipeline, 9 of
which are within North Ayrshire. 
2.14 An Asylum Partnership Board chaired by Glasgow City Council has been set up for
local authorities to understand the legal processes and to share emerging best practice
and discuss arising issues. 
2.15 Until March 2023, any bedspaces Mears procures will attract funding for the local
authority of £3,500. This is a one-off payment per bedspace and can be used by the
local authority as required. The aim of the funding is to provide support to services that
are impacted by the widening of dispersal. COSLA are continuing to work with the
Home Office to ensure there is sustainable funding beyond March 2023 which reflects
the true cost of asylum to a local authority. 
Rights of asylum seekers 
2.16 Asylum seekers have no recourse to public funds; therefore they are not entitled to
mainstream benefits and housing except in exceptional circumstances. In addition, they
do not have a right to work and are provided with £40.85 per week for food, clothing,
and toiletries. 
2.17 Local authorities have a statutory duty, as they would with anyone moving into the area,
to provide any social care and social work support to asylum seekers if needed and
provide accessible education for children within asylum seeking families. 
2.18 Local health partners (NHS and HSCPs) have a statutory duty to provide appropriate
health care to asylum seekers; this includes registration with a GP. 
2.19 Mears is considering how they can link in with partners to support integration and
support. This will include guidance on accessing ESOL, community support and
orientation and access to religious activities. Mears is keen to work with Police
Scotland, local authorities and third sector partners to ensure that any issues of
community cohesion are addressed quickly. 
229

Page 230

2.20 Asylum seekers will stay in accommodation until the outcome of their application has
been finalised (including the appeal process). If their application is refused, they must
return to their country of origin; support and accommodation will be discontinued after
21 days. If their application is approved, they have the same rights as all other refugees
including access to benefits and housing; asylum support ends after 28 days, with the
duty being passed to local authorities and wider partners. 
What does the asylum dispersal programme mean for North Ayrshire? 
2.21 Since 2015 the Council and community planning partners have supported a total of 211
households, comprising of 596 individuals, to resettle in North Ayrshire across the
various humanitarian programmes, broken down as follows:
• 2015 - Afghan Locally Engaged Staff Ex Gratia Scheme – 6 households (26
individuals)
• 2015 to 2021 - Syrian Resettlement Programme (SRP) – 41 households (201
individuals)
• 2021 to date - UK Resettlement Scheme (UKRS) – 2 households (10 individuals)
• 2021 to date - Afghan Relocation & Assistance Programme (ARAP) – 2
households (10 individuals)
• 2022 to date - Ukrainian resettlement schemes 160 households (349) individuals 
2.22 The resettlement to date equates to 161 social rented tenancies being utilised to
accommodate households across all schemes, 110 of which have been utilised since
May 2022 to accommodate families fleeing the war in Ukraine. 
2.23 The Scottish Government has a deadline of 31 March 2023 to rehouse the remaining
983 Ukrainian individuals currently residing on the MS Ambition cruise ship docked in
the Clyde. Attention will then focus on assisting with the relocation programme from the
Ms Victoria docked at Leith. 
2.24 North Ayrshire Council currently support a Ukraine welcome hub at the Riverside
Lodge, Irvine and officers are in discussions with the Scottish Government to develop
further temporary accommodation at Boyle Street, Irvine to help accommodate
Ukrainian displaced people leaving both ships. 
2.25 In addition, the Council has an outstanding commitment to accommodate a further
three ARAP (Afghan) and four UKRS families. 
2.26 It is imperative that the Council maintains and protects its statutory homelessness
duties. There is significant pressure on temporary accommodation for homeless
people, with an average six month wait for an offer of permanent housing in the last
nine months. The Homeless Service experienced extreme pressure in the provision of
temporary accommodation at the beginning of February 2023, which almost resulted in
a failure to meet our statutory responsibilities. 
2.27 Mears aim to utilise private sector accommodation within North Ayrshire and are
230

Page 231

working with both private landlords and investors to build up their accommodation
portfolio. They have approached the Council to ascertain whether there is an
opportunity to utilise Council and RSL social rented housing, however given the current
pressures being managed by the Homeless service as detailed above, officers are not
able to recommend this to Cabinet. 
2.28 Asylum seekers subject to relocation via the full dispersal model will already have had
their asylum application lodged and will therefore have a right to remain in the country
pending full approval. Initial screening and health checks will have been undertaken
prior to their arrival in North Ayrshire. 
2.29 60% of all asylum applications are from single male households, therefore this is likely
to be the profile of the majority of cases arriving in North Ayrshire. Mears have offered
reassurance that they will provide Council officers with the profile information of asylum
seekers arriving in North Ayrshire. 
2.30 Should asylum seekers be awarded refugee status, they will have the right to make a
homeless presentation locally and therefore be entitled to both temporary and
permanent accommodation. This will increase the pressure on housing detailed above.   
2.31 There are significant resource pressures across North Ayrshire for key services, with
GP demand outstripping clinical capacity in some areas and capacity pressures in
some schools. 
2.32 Council officers have provided Mears with an overview of the pressures across North
Ayrshire. Mears have agreed that they will not pursue procuring accommodation on the
island communities and that they will work with officers on a property-by-property basis
on the mainland to ascertain suitability for use for the asylum dispersal programme. 
2.33 Mears are currently screening three two-bedroom properties in North Ayrshire with a
view to procuring them; two are in Irvine and the third is in Kilwinning. It is likely that
each flat would accommodate three asylum seekers, amounting to the resettlement of 9
people against the year one target of 57.  
2.34 Mears have confirmed that they are working to disperse asylum seekers across North
Ayrshire, as opposed to having clusters of households in one area. They have also
offered assurance that if an asylum placement breaks down for any reason, they can
remove the asylum seeker with immediate effect, minimising the impact on the
community. 
2.35 Council officers are keen to engage with Mears in a positive and supportive manner
and have invited them to have a space on the agenda at each North Ayrshire Refugee
Task Force meeting. This will ensure that there is a strategic overview of emerging
issues, with the ability to work in partnership to secure the best outcomes for asylum
seekers.  
231

Page 232

3. Proposals 
3.1 That Cabinet: 
i. notes the support being provided within North Ayrshire across the various
humanitarian resettlement schemes.
ii. notes the current pressure on Housing and wider services.
iii. notes the Home Office rollout of a ‘full dispersal’ model for asylum seekers
across the UK and the implications this has for North Ayrshire
iv. agrees that the Council is not in a position to offer social rented housing as part
of the wider dispersal programme.
v. approves the approach taken by Council officers to support Mears with the
asylum dispersal programme by working in partnership to support the integration
process through the Refugee Task Force. 
4. Implications/Socio-economic Duty
Financial
4.1 Until March 2023, any asylum seeker placed into North Ayrshire will attract Home
Office funding of £3500. The purpose of the funding is to provide support to services
that are impacted by the widening of dispersal. COSLA are continuing to work with the
Home Office to ensure that there is sustainable funding in place beyond March 2023
which reflects the true cost to the local authority. 
Human Resources 
4.2 Officers will monitor the impact of the asylum dispersal programme on existing staffing
resources. Should additional resources be required, the costs will be met from the UK
Government funding allocated for this purpose. 
Legal 
4.3 The UK is a signatory to the 1951 UN Convention relating to the status of refugees
and is obliged to consider properly any application for asylum made in the UK by a
person who claims to be fleeing persecution. 
4.4 Asylum is a matter reserved to the UK Government and handled by the Home Office.
Scottish Government and local authorities are responsible for devolved matters,
including access to essential services like healthcare and education, that enable the
integration of refugees and asylum seekers in Scottish communities. 
Equality/Socio-economic 
4.5 Should the asylum seekers be granted full refugee status, they will be entitled to
secure employment. Many of the refugees and displaced people who have settled
within North Ayrshire to date have arrived with a variety of skills and attributes which
enrich our communities, and, in a local context, this may help to address some of the
demographic challenges within North Ayrshire. 
232

Page 233

Climate Change and Carbon 
4.6 None 
Key Priorities 
4.7 All asylum seekers arriving in North Ayrshire will be supported to resettle here in the
short and - subject to award of refugee status – long term.  This will support delivery of
the Council Plan priorities of ‘Active and strong communities’ and People and
communities are safe’ 
Community Wealth Building 
4.8 None 
5. Consultation 
5.1 Discussions have taken place at the North Ayrshire Refugee Task Force to ensure all
partners are aware of the likely implications of the asylum dispersal programme. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Janeine Barrett, Senior Manager (Homelessness
and Community Safety), on janeinebarrett@north-ayrshire.gov.uk 
Background Papers
0
233

Page 234

234

Page 235

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Roads, Structures and Street Lighting Maintenance
Programme 2023/24 
Purpose:  To seek Cabinet approval of the proposed Roads, Structures
and Street Lighting Maintenance Programme for 2023/24. 
Recommendation:  That the Cabinet (a) notes the approach taken to determining
the asset maintenance programme for roads, structures and
street lighting; (b) approves the maintenance programme for
2023/24, as shown at Appendix 1a and 1b; (c) approves the
additional works up to the value of £1m, identified for 2023/24 at
Appendix 1c should the Council realise an underspend of £1m
or more for 2022/23 and (d) notes that the programme will be
issued to the Locality Planning Partnerships for information. 
1. Executive Summary 
1.1 North Ayrshire Council has a statutory obligation under the Roads (Scotland) Act 1984
to manage and maintain its public road network. The adopted road network within
North Ayrshire has a total length of 1044km.  The core roads assets are currently
estimated at a value of approximately £1.7billion. 
1.2 The Council’s Roads Service has adopted an asset management approach to road
maintenance to allocate available road maintenance funds to locations that will offer
the most beneficial return on the investment. 
1.3 The Roads Asset Management Plan (RAMP) and the roads assets maintenance
strategy follows the recommendations contained within the ‘Well Maintained
Highway’s Code of Practice, ensuring that the Council’s statutory obligations as
delegated Roads Authority are met. 
1.4 In complying with the Code of Practice, an effective regime of inspection, assessment
and condition recording is well established which assists in not only providing a road
network for the future but one that promotes social inclusion and contributes to
economic growth within the area. This approach also ensures the Council is providing
value for money on any investment attributed to road maintenance. 
1.5 The proposed Roads, Structures and Street Lighting Maintenance Programme
2023/24 is attached in Appendix 1a and 1b. The Programme is based on approved
Revenue and Capital budgets, including an additional £0.5m which will be funded from
approved capital infrastructure investment. At the Council’s budget setting me on 1
Agenda Item 13
235

Page 236

March 2023 an extra (up to) £1m was agreed for roads infrastructure subject to the
Council realising an underspend for Financial Year 2022/23. Details of proposed
additional works are attached at Appendix 1c. 
2. Background 
2.1 North Ayrshire Council is responsible for the maintenance of the adopted local road
network including lighting and structures assets as well as its other non-adopted road
assets. However, the Council has no responsibility for the maintenance of the Trunk
Road Network which falls to Transport Scotland and their management contractor,
Amey. The Trunk Road network includes the A78, the A737 from Kilwinning to the
Renfrewshire Boundary and A738 from the Pennyburn Roundabout to the A737 Dalry
Road Kilwinning. 
2.2  North Ayrshire Council’s roads are the Council’s largest community asset and play a
vital role in supporting the local and wider economy by facilitating the movement of
people, goods and services and connecting people with economic and social
opportunities. 
2.3  The proposed Roads, Structures and Street Lighting Maintenance Programme for
2023/24 has been developed in accordance with the strategy contained within the
Roads Asset Management Plan (RAMP) to deliver the maximum return on investment
and ensures the provision of an effective road network throughout North Ayrshire. 
2.4  Road Condition is measured nationally through the Scottish Road Maintenance
Condition Survey (SRMCS). The measure in place, the Road Condition Index (RCI),
records the percentage of the Council’s roads which should be considered for
maintenance. North Ayrshire’s RCI has been improving in recent years and is
currently 33.9%. 
2.5 The estimated carriageway maintenance backlog figure for North Ayrshire is currently
£34.8m. The ‘steady state’ figure for maintaining our roads at present condition is
£4.3m per year. The capital budget supported by revenue funding is £4.45m for
2023/24. This includes £100,000 carried forward from 2022/23 for planned works. An
additional £0.5m has been identified from the ‘core infrastructure, property and
vehicles renewal investment’ capital budget allocation, taking the total investment in
the road network to £4.95m for 2023/24. Additionally, at the Council’s budget setting
meeting on 1 March 2023 an extra (up to) £1m was allocated to roads revenue
investment for 2023/24 should the year end outturn for 2022/23 deliver an underspend
of £1m or more.  This level of investment outpaces the ‘steady state’ figure and should
therefore contribute to an improvement in the road network condition over time.  
2.6 Road lighting condition is measured through programmes of structural and electrical
assessment and testing and is complemented through the ongoing review of age
profile and material type life expectancy. The results are categorised and recorded in
the lighting asset management database to inform a prioritised list of replacement
schemes. Lighting is allocated an annual Capital budget of £1m to address a ‘steady
state’ position of maintaining our lighting at present annualised depreciation rate. 
2.7 Bridge and retaining wall condition is also evaluated through a robust inspection
programme. General inspections are undertaken every 2 years, while an in-depth
236

Page 237

‘principal inspection’ is carried out every 6 years and the results of the inspections are
used to inform work programmes. The results of the inspections are input into a
Structures database which is then used to calculate an average Bridge Structure
Condition Index (BSCIav) based on the total number of assets. The BSCIav is
currently 85.79 (2021/22 figure) which is within the ‘good’ classification of 85 to 94.
This figure is a slight fall on the previous year. The allocated capital budget of
£935,000 is supported by a small amount of revenue funding giving a total of £1.07m. 
2.8  Details of how condition assessments are carried out and how roads, structures and
lighting locations are prioritised for inclusion in our maintenance programme are
provided in Appendix 2. The assessment matrix used for scoring and ranking
structures for inclusion in the Structures Maintenance Programme is attached in
Appendix 3. 
2.9 The road maintenance programme in 2022/23 mitigated high inflationary cost
increases through two factors - by forecasting higher projected costs and building this
into the programme early in the financial year and, secondly, the Ayrshire Minor Works
Framework contract price being held for the 6 months to September 2022.  Works
completed by the operational team and any works tendered since then were subject to
inflationary rises in material and plant costs as well as contractor price increases.  The
2023/24 road maintenance programme has been prepared based on a 20%
contingency increase in 2022/23 costs to allow for further inflationary rises in
operational costs and to ensure that programmed works can be completed. 
3. Proposals 
3.1 That Cabinet notes the approach taken to determining the asset maintenance
programme for roads, structures and street lighting. 
3.2  That Cabinet approves the maintenance programme for 2023/24, as shown at
Appendix 1a and 1b. 
3.3 That Cabinet approves Appendix 1c which will deliver an additional up to £1m of road
infrastructure works for 2023/24 should the year end outturn for 2022/23 realise an
underspend of £1m. 
3.4  That Cabinet notes that the programme will be issued to Locality Planning
Partnerships for information. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Roads, Structures and Street Lighting Maintenance Programme will be delivered
from allocated Capital and Revenue budgets. Estimated costs are detailed within the
appendices. 
Human Resources 
4.2 Delivery of the programme will be met from existing staff resources. 
237

Page 238

Legal 
4.3 North Ayrshire Council has a statutory obligation to manage and maintain its public
road network under the terms of the Roads (Scotland) Act 1984. 
Equality/Socio-economic 
4.4 There are no equality implications. The maintenance programme contributes to the
Council’s socio-economic duty, as well-maintained roads are essential for the social
and economic prosperity of North Ayrshire. 
Environmental and Sustainability 
4.5 Effective programming and management of these assets will assist in reduced carbon
associated with mobilisation of unplanned reactive maintenance resources and
extends the use of assets in a cost effective and sustainable manner. 
Key Priorities 
4.6 Effective management of these assets contributes to a number of Council plan
objectives ensuring that North Ayrshire is well-connected with effective infrastructure
and that we maximise resources and provide value for money. 
Community Wealth Building 
4.7 The maintenance programme contributes to Community Wealth Building through
community benefits clauses associated with maintenance contracts. It is also the case
that a proportion of the maintenance programme is also delivered in-house by the
Roads Operations Team and Building Services. 
5. Consultation 
5.1 The maintenance programme will be shared with each Locality Partnership. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Neighbourhood
Services, on Tel: 01294 324570. 
Background Papers
0
238

Page 239

Mainland Roads Programme 2023/24
Appendix 1a
Carriageway Resurfacing
Street Town Location Estimate
Cost
Stanley Road /
Galloway Place
Saltcoats Carried forward from 22/23 £100,000
B706 Dunlop Road Barrmill Roundabout and exit towards A736 include
circle at McHardy Crescent
£120,000
The Strand /
Townhead
Beith Eglinton Street to Kirk Road  £65,000
B780 Kilbirnie Loadingbank towards Roundabout £140,000
Stuart Street Millport Cardiff Street to Clifton Street £180,000
Parkhouse Road Ardrossan McDowall Avenue to Garage £110,000
Sorbie Road Saltcoats Approach to Traffic Lights £55,000
Shore Road Stevenston near the level crossing £55,000
Ardeer Road Stevenston From Railway Bridge to Roundabout £140,000
Old High Road Stevenston Mayville Street to A738 £105,000
Mayville Street /
Glebe Street
Stevenston High Road to Boglemart Street £80,000
Middleton Road Irvine Part Length £150,000
East Road / High
Street
Irvine mini roundabout to Kirk Vennel  £60,000
Braehead   Dalry Braehead to speed limit signs £160,000
Netherlee Crescent Dalry Including Ryeside and Templand Road £80,000
Caledonia Road /
Argyle Road
Saltcoats Sorbie Road to Jacks Road £210,000
Main Street West Kilbride West Kilbride Parish church to Headrigg
Gardens
£75,000
Merlewood Road West Kilbride Full Length £15,000
Castlepark Gardens Fairlie Full Length £60,000
Alexander Avenue Largs Holehouse Road to Burnside Road £95,000
Brisbane Road Largs Boyd Street to Seamore Street £25,000
Waterside Street Largs Including junctions at Silverdale £80,000
Stakehill Largs Part Length £65,000
Anderson Terrace Ardrossan Part Length £60,000
Chapelhill Mount Ardrossan Part Length £100,000
Carson Drive Irvine Ayr Road to just passed Gray Crescent £60,000
Castlepark circle Irvine Leven Place to existing joint £130,000
Harbour Road Irvine Victoria Roundabout to Portland
Roundabout
£140,000
Station Road Springside Part Length £95,000
Barra Crescent /
Place / Lane
Irvine 3 cul de sacs and part of main entrance
road
£70,000
Gigha Crescent Irvine From Roundabout to end £50,000
Greenside/Mid-
rig/Chapelgill
Irvine Part Length £40,000
B778 Kilwinning South of Mossculloch to Goldcraigs Depot  £150,000
Beechwood Kilwinning Part Length £50,000
Corsehill Road Kilwinning Part Length £110,000
239

Page 240

Mainland Roads Programme 2023/24
Appendix 1a
Kennedy Road Saltcoats Full Length, Including West Doura Junction £114,000
Station Road Skelmorlie Part Length £30,000
Seton Terrace Skelmorlie Skelmorlie Castle Road for approx 50m £20,000
Hillview Skelmorlie Part Length £25,000
Martin Square Saltcoats Part Length £60,000
Sannox Drive Saltcoats Even side £60,000
Greenhead Avenue Stevenston Full Length £75,000
Ardchoille Drive Stevenston Full Length £20,000   
£3,684,000 
Carriageway Surface Dressing
Street Town Location Estimate Cost
B781 West Kilbride Blackshaw Farm to Gill Farm £16,000   
£16,000  
240

Page 241

Mainland Roads Programme 2023/24
Appendix 1a
Carriageway Screeding
Street Town Location Estimate Cost
Glebe Street Saltcoats Springvale Street to Glebe Place £14,000
Lawson Drive /
Ashgrove Street
Ardrossan Lawson Drive past shops to Ashgrove £24,000
Whitlees court Ardrossan Part Length £18,000
Pollock Crescent Kilwinning Part Length £22,000
C68 Beith Junction with U42 to A736 £45,000
U42 Lugtonridge
Road
Beith South Nettlehirst and Lugtonridge £28,000
Dipple Road Kilbirnie Part Length £67,000
C99 Dalry Stoopshill to the joint before the B707 £106,000
C20 Kilwinning South Lodge cottage to Torranyard £71,000
U8 Boag Road Beith Part Length £46,000
Brownmuir farm to
boundary
Beith Full Length £17,000
Woodside Beith Woodside to boundary £22,000
Bogside Beith Part Length £50,000
Kilruskin Road West Kilbride Part Length £20,000   
£550,000 
241

Page 242

Mainland Roads Programme 2023/24
Appendix 1a  
Footway Resurfacing
Street Town Location Estimate Cost
Thorntree Avenue  Beith Part Length  (Full Length Odd Nos, 38-56
Even Nos)
£26,000
St Margarets Avenue Dalry Kittyshaw to Houston Crescent (incl 2 cul-
de-sacs)
£50,000
North Street /
Braehead
Dalry Regal Court to Braehead Place £43,000
St Andrews Road Ardrossan Number 1 to Number 35 £28,000
Kilruskin Drive  West Kilbride Full Length £29,000
Provosts Loan Cumbrae Full Length £17,000
Braeside Ave and
Meadowbank Rd
Largs Part Lengths £36,000
Main Street Dreghorn One side only from No.108 to change in
surface
£10,000
Stronsay court Irvine Full Length £5,000
Clements Place Stevenston Full Length £9,000
Oakland Drive Stevenston Full Length £5,500
West Doura Way /
Court
Kilwinning Whitehirst Park PS to shop, including car
park and shop footpaths and the slabbed
area outside shop
£17,500
Murray Avenue Saltcoats Mid Dykes Road to road end (Both Sides) £15,000
Longfield Avenue Saltcoats Part Length £14,000
Wellpark Road Saltcoats Number 23 to Number 31 (One side only) £4,000
Kenilworth Drive Saltcoats Footpath from Kenilworth Drive to Munro
Place
£6,000
Miller Road Saltcoats Full Length £15,000   
£330,000
242

Page 243

Mainland Roads Programme 2023/24
Appendix 1a
Lighting Deteriorated Infrastructure Replacements
Area Town Estimate Cost
Longhill
Seton Terrace
Sandy Brae Road
Skelmorlie £90,000
Corsehill Drive West Kilbride £55,000
Lindsay Crescent
Auchenmaid Drive
Linn Avenue
The Roundel
Castlehill Drive
Largs £80,000
Tarryholme Drive
Warrix Avenue
Kirk Vennel
Parterre
Benbain Place
Golf Place
Ravenscroft
Braeside
Whyte Avenue
Irvine £205,000
Schoolwell Street
Grange Road
Kerelaw Road
Sinclair Street
Loccard Road
Limekiln Road
Stevenston £127,000
St Inans Drive 
Rowan Avenue
Bigholm Road
Backburn
Beith £70,000
Milton Road
Ladyland Drive Kilbirnie £87,000
Findlay Avenue
West End
Sharon Street
Dalry £59,000  
£773,000 
Lighting Deteriorated Column Replacements
Area Town Location Estimate Cost
Various Unplanned Locations   £169,000 
Lighting Deteriorated Column Inspections
Area Town Location Estimate Cost
Various Locations   £58,000
243

Page 244

Mainland Roads Programme 2023/24
Appendix 1a 
Carriageway Resurfacing:   £3,684,000
Carriageway Surface Dressing:   £16,000
Carriageway Screeding:    £550,000
Footway Resurfacing:    £330,000 
Lighting Infrastructure Replacements:  £773,000
Deteriorated Column Replacements:  £169,000
Deteriorated Column Inspections:  £58,000 
Structures Projects:    £755,000 
Overall Mainland Total:    £6,335,000 
Structures Projects
Structure Road Project Estimate Cost
Kersland Culvert B714 UV liner culvert repairs £80,000
Seven Acres Mill
Bridge 
U54 Bridge Replacement £450,000
Roughwood Bridge U12 General Repairs £30,000
Threadmill Bridge  C99 Replacement / Strengthening  £160,000
Carsehead Bridge  B714 General Repairs   £35,000   
£755,000
244

Page 245

Arran Roads Programme 2023/24
Appendix 1b 
Carriageway Resurfacing
Street Town Location Estimate Cost
Benlister Road Lamlash 8 Park Terrace to road end £40,000
Golf Course Road Blackwaterfoot Queenscliff to Car Park £30,000
B880 String Road Brodick Patching Various Locations £200,000
A841  3 sections between Brodick & Sannox £160,000
A841 Lochranza Patching Works - Ballarie Bridge
towards Sannox
£70,000   
£500,000 
Carriageway Surface Dressing
Street Town Location Estimate Cost
A841 Brodick
Junction B880 to slipway past Shore
Lodge £60,000
A841 Lamlash
Strathwillan Road Junction Brodick to
Glenisle Hotel £140,000   
£200,000 
Carriageway Resurfacing: £500,000
Carriageway Surface Dressing: £200,000
Structures Projects:  £180,000
Overall Arran Total:  £880,000
Structures Projects
Structure Road Project Estimate Cost
Culvert West of
Ballymeanoch  
C147 Retaining wall strengthening                  £70,000
Dougarie
Bridge             
C147 Temporary Strengthening/ Scour
repairs    
£50,000
Catacol
Bridge                
C147 Temporary Strengthening/ Scour
repairs    
£60,000   
£180,000
245

Page 246

Mainland Roads Programme 2023/24
Appendix 1c 
Additional Budget £1m
CARRIAGEWAYS
Street Town Location Estimate Cost
Dickson Drive  Irvine From Redburn CC to jct Dick Terrace £50,000
B7081 Annick Road Irvine Riverside Lodge to Newmoor  £57,000
Stobbs Crescent Kilwinning Part Length £40,000
Pennyburn Road Kilwinning A738 jct to Cranberry Road jct £66,000
B7049 Eglinton Road Beith From ped crossing at Main St to speed
table
£97,000
A760 Kilbirnie From Connelston to Auchencloigh Farm
Rd
£225,000
C18 Ardrossan High
Road
West Kilbride Part Lengths £36,000
Mackerston Place Largs Full Length incl Stanlane jct £67,000
Brisbane Glen Road Largs From Douglas Street to cemetery £114,000
B896 Cumbrae Patching and Screeding £80,000
Various  PATCHING CONTRACT £80,000
FOOTWAYS   
Street Town Location Estimate Cost
Sillars Meadow Irvine Full Length £64,000
Townhead Street Stevenston No.103 to Post Office £20,000
Lochlie Place Stevenston Full Length £4,000   
£1,000,000
246

Page 247

Appendix 2 
Condition Assessment and Prioritisation Process 
1.1 The Audit Scotland Follow-up report, Maintaining Scotlands Roads published in
August 2016 stated that Councils should use their RAMPs to establish long term
investment plans for maintaining the road network taking into acount whole-life
costing and treatment options. 
1.2 As part of the Roads Asset Management process, annual condition assessments
are carried out on the public road network as part of the inspection regime. All
locations are assessed using a risk based approach. 
1.3 Condition assessments are carried out simultaneously with the Safety 
Inspections in accordance with the pre-determined timescales contained within
our Safety Inspection Manual. All faults noted during these inspections are
logged within our electronic Routine Maintenance System (RMS). 
1.4 For carriageways, to take account of whole-life and different treatment options
the carriageway maintenance programme is developed using road asset
management principles. Lifecycle planning is at the core of this approach and
takes into account, hierarchies, condition and local community priorities.
Preventative treatments are used to prolong the life of carriageway surfaces
before their condition deteriorates and requires extensive resurfacing.   
1.5 The main factors considered are:- 
• Road Condition – based on detailed visual inspection and the Scottish Road
Maintenance Conditions Survey (SRMCS). 
• Road Hierarchy – this takes account of the strategic importance of the road
and is determined from our Local Transport Plan. 
• Assistance to Council and Community Priorities – this takes account of other
priorities such as economic development,  access to shops, amenity housing
or schools. 
1.6 Carriageways and footways are both condition assessed and scored in
accordance with the assessment table below. These condition scores, RCI data,
road hierarchy information and priorities information as above are utilised
through our electronic WDM Scheme Manager to target locations for
improvement works in order to optimise investment.   
247

Page 248

Appendix 2 
Assessment Table   
CONDITION
Extent 1
(Acceptable)
2
(Safe but poor
appreance)
3
(Minor
deterioration)
4
(Major
deterioration)
1 - Up to 25%  5 9 13
2 – 25% to
50% 
6 10 14
3 – 50% to
75% 
7 11 15
4 – 75% to
100% 
4 8 12 16 
Each location is also reviewed at least once a year depending on its location
within the Roads Hierarchy as part of the routine inspection process. 
1.7 There are various types of surfacing materials and processes available
depending on the particular road type, location and level of existing deterioration.
Options available for treatment include preventative measures such as surface
dressing and resurfacing options such as screeding, resurfacing (inlay and
overlay), depending on the severity of deterioration full reconstruction may be
the most effective option. 
1.8 The level of investment associated with the varying treatment types identified in
the table below was established using the Society of Chief Officers of
Transportation in Scotland’s cost projection model,  developed as part of the
Roads Asset Management Planning project. The model assists with identifying
the effect of various treatments on the  on-going condition of the carriageway.
This enables a more accurate design life for the treatments currently available to
be developed and ensuring value for money on their use.   Costs for works can
vary from the figures below depending on restricted working arrangements, traffic
management required and the extent of preparatory works necessary to enable
resurfacing.  There is also an additional uplift for island working of up to 50% for
works on Arran and Cumbrae. 
248

Page 249

Appendix 2 
Treatment Option Table 
Treatment Option Cost per Sqm
2021/22
Cost per Sqm
2022/23
%
Change
Extension to life
Surface Dressing £3.30 £3.60 +9% Up to 10 years
Screeding £9.00 £11.50 +28% 5 – 10 years
Inlay HRA £18.00 £22.00 +22% Up to 20 years
Overlay <100mm £20.70 £26.50 +28% Up to 20 years
Inlay 100mm £27.26 £32.30 +18% Up to 20 years
Reconstruction 
300mm
£112.40 £140.00 +25% Up to 20 years 
1.9 Street Lighting column replacement is prioritised through non-destructive
strength testing to determine the level of deterioration associated with the
columns. Following testing, columns are categorised within the Asset
Management database for road lighting. 
1.10 Testing is carried out in accordance with the Institute of Lighting Engineer's
Technical Report No.22 Managing a Vital Asset: Lighting Supports as well as UK
Lighting Board Code of Practice: Well-lit Highways. 
1.11 Once results are input, the database then compares these results against the
more general age profile to determine a final list of priority repairs. This produces
recommendations in order of priority for both individual units and whole streets
or areas. 
1.12 Recommendations are generally categorised as Category A through K as
follows: 
A:  Immediate replacement 
B:  Replace urgently or reinspect within 6 months 
C1: Column Material failure, replace as soon as possible or reinspect within
1 year 
C2: Bracket failure, sleeve where possible or replace unit within 1 year 
D:  Foundation failure, realign, reinstate and reinspect within 6 months 
E: Material approaching failure, replace as part of planned maintenance
programme or reinspect within 2 years 
F:  Material approaching failure, replace as part of planned maintenance
programme or reinspect within 5 years 
249

Page 250

Appendix 2 
G:  Condition reasonable, but age expired and certified insured  for 2 year
periods until replaced 
H:  Condition reasonable, but age expired and certified insured  for 5 year
periods until replaced 
I:  Acceptable condition but age expired and insured for 5 years  periods
until replaced. 
J:  Sound condition but age expired & visually poor (evidence of concrete
cracking etc.) 
K:  Sound condition and not age expired – no current requirement for strength
structural inspection, visual only at planned maintenance cycle. 
1.13 Where non-urgent replacement recommendations (Category F through to J) are
on an individual column basis, the data is further analysed to determine a
percentage value for recommended replacement numbers against the balance
of units in a street. If this figure exceeds 30% then the entire street will be
considered for higher prioritisation which will address the design class standard
of the street beyond individual replacement for safety reasons only. 
1.14 The structures programme is identified based on the structures prioritisation
matrix which ranks assets based on a number of factors including its condition,
safety, and usage. 
250

Page 251

Structure Name: Enter score based on the description in the following coloured cells
Date when the scoring is carried out:
Priority Ranking for structure capital programme Structure Net score % of
Maximum Score total Score
No. Factors Score Input
1
Type of Bridge 1 Score 1 if road bridge and 0
if foot bridge
Culverts, Subways which carry road shall be
considered as road bridge as per this scoring system.
Structures which carry only pedestrians, cyclists and
equestrians shall be considered as footbridge.
NA
2 Route Factor 40 Score based on NAC route hierachy Route hierachy 0 0%
Cat 2 - SPT/ NAC strategic routes - 40
Cat 3a - Main distributor routes - 30
Cat 3b - secondary distributor routes - 20
Any other category - 10
Routes serving fewer than 5 properties - 5
3 HGV Restriction 60 Score based on weight capacity Weight restriction 0 0%
factor 3 tonnes - 60
7.5 to 13 tonnes tonnes - 50
18 tonnes - 40                 
26 tonnes - 30
No weight restriction - 0
4 Condition factor 10 Score based on the condition of the
bridge
Sliding score based on 0 for very good condition to
10 for poor condition. (10 - (BCI crit/ 10)) 0 0%
5
Deterioration
factor
10 Score based on the rate of
deterioration of the structure
Sliding score based on 0 for very slow deterioration
to 10 for rapid deterioration 0 0%
6
Pedestrian
factor
20 Score based on pedestrian usage.
Bridges with footways of heavy
pedestrian usage shall score a
maximum of 30.
Structures with footways in heavily used urban areas
score 20. Score 20 if route is access to a school or
railway station. Apply a sliding scale going down to 0
for rural structures without footways.
0 0%
7
Flooding factor 40 Score based on the potential for the
existing structure to contrubute to
flooding
A structure that makes no contribution to flooding
risk will score 0. Structures that are know to increase
the risk of flooding due to restrictions in width or
soffit height will score 30.
0 0%
8
Scour factor 60 Score based on risk of collapse due
to expose to scour in heavy flow
conditions
Risk of collapse of structure due to scouring.
Structures which have been deterioted severely
because of inadequate scour protection and on verge
of collapse score maximum. Scour risk based on a
sliding scale.
0 0%
9
Parapet Condition
Factor
15 Score based on the condition of the
parapets
Structures with substandard Parapets with poor
conditon will score 15 . Structures with substandard
parapets with a 'monitor only' recommendation will
score 10. Structures which have parapets to current
standards will score 0.
0 0%
10
Parapet Risk
Factor
10 Score based on risk  in the event of a
parapet collapse leading to high risk
injuries and human casualties.
What is the likelihood of severe injury or even death
while the parapet is open to use considering the
condition of the structure. Risk based on a sliding
scale.
-5 100%
Structure Name:
Additional commentry
251

Page 252

11
Delay factor 10 Score based on whether existing
restrictions such as limited width
cause delays at the structure
Structures where delays are caused by width, weight,
height or other restrictions such as traffic lights will
be given a score higher than zero. Delays less then 2
minutes at peak times will score 5 and longer than 2
minutes will score 10. Score maximum if fire station,
railway station or hospital affected by delay.
0 0%
12
Structure Risk
factor
10 Score based on risk  in the event of a
Structure collapse leading to high
risk injuries and human casualties.
What is the likelihood of someone getting a high risk
injury or even death while the structure is open to
use considering the condition of the structure. Risk
based on a sliding scale.
0 0%
13
Maintenance
factor
20 Score based on maintenance
required to keep the existing
structure open.
Score based on known maintenance history and
requirement. No maintenance requirement will score
0. Listed structures score 15.
0 0%
14
Diversion factor 10 Score based on the length of the
diversion route if the structure is
closed in an unplanned manner with
no finite time limit.
Score based on diversion length. Any diversion equal
to or more than 20 miles scores 20. Score 1 for each
2 miles of diversion up to 20. Score 10 if a road
closure adversly affects a fire or railway station or
hospital. Score 10 if there is no alternative diversion.
0 0%
-5
Note maximum score that can be achieved for road bridge= 500
Priority level Chart Structure Name:
Date of Scoring: 00-Jan-00
Priority Level Indicator Overall works (500) Structure works (100) Parapet works (70) Scour Protection (60)
Level Score Level Score Level Score Level Score
No Action Rquired       
Low Priority       
Medium Priority       
High Priority       
Immediate action required       
Note : Works are divided above into three sub categories as each work can be independent and
each has its own significance in terms of attention required.
252

Page 253

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title: 
Consultation on Scottish Government’s draft Energy
Strategy and Just Transition Plan    
Purpose: To seek Cabinet approval for the proposed response to the
consultation on the Scottish Government’s draft Energy
Strategy and Just Transition Plan.  
Recommendation:
That Cabinet approves the response attached as Appendix
1 as the North Ayrshire Council response to the Scottish
Government consultation in relation to the draft Energy
Strategy and Just Transition Plan.   
1. Executive Summary 
1.1 The Scottish Government has launched a consultation on the Scottish
Government’s draft Energy Strategy and Just Transition Plan. This report sets out
the Council's proposed consultation response.
1.2 The proposed response at Appendix 1 sets out broad support for the vision, wider
policy statements and detailed actions underpinning them. The response also
highlights a number of particular barriers for renewable energy projects that have
been experienced recently, including issues of grid capacity, grid connection costs
and timescales, and options for sale of energy.
2. Background
2.1 In January 2023, the Scottish Government published its draft ‘Energy Strategy and
Just Transition Plan’. The deadline for responses was recently extended and is 9
May 2023.
2.2 The Plan sets out policy positions and a route map of actions with a focus to 2030
to realise climate change ambitions. It recognises that there is a need to transform
the way Scotland generates, transports, and uses energy in order to deliver a
vision where by 2045 Scotland has a flourishing, climate friendly energy system
that delivers affordable, resilient and clean energy supplies for Scotland’s
households, communities and business. 
2.3 The document sets out a sector-by-sector approach to renewables, addressing fuel
insecurity and other energy related matters, articulating ambitions to scale up
generation across a range of technologies, along with reducing demand. The
Agenda Item 14
253

Page 254

strategy notes that there are matters not devolved and/or where co-ordination with
UK Government will be required, such as electricity market reform and carbon
capture and storage that will be critical components of the transition to net-zero. 
2.4 The draft Plan has three overall aims for Scotland:
1. To scale up renewable energy production, helping to secure a just transition
to net zero and reducing energy demand;
2. To support continued investment in green energy that delivers economic
opportunities, including more jobs, new manufacturing capabilities and
increased access to global markets and technologies for Scottish businesses
and supply chains;
3. To deliver reliable, a more secure and affordable net zero energy system to
protect from future energy price volatility.
2.5  To achieve these aims, the draft strategy route map includes the following key
proposals:
 More than 20 GW of additional renewable electricity from on-and-offshore
sources by 2030
 People have access to clean, affordable energy to reduce fuel poverty
 An ambition for hydrogen production to provide 5 GW or the equivalent of
15% of Scotland’s current energy needs by 2030, increasing to 25 GW
capacity by 2045
 Accelerated decarbonisation of domestic industry, transport and heat
including one million homes decarbonised by 2030; and the establishment of
a national public energy agency – Heat and Energy Efficiency Scotland
 The phasing out the need for new petrol and diesel cars and vans by 2032
and reduction in car kilometres travelled by 20% by 2030
2.6 The proposed response at Appendix 1 sets out broad support for the vision, wider
policy statements and detailed actions underpinning them. The proposed response
highlights a number of particular barriers for renewable energy projects that North
Ayrshire Council has direct experience of, including grid capacity, grid connection
costs and timescales, and options for sale of energy. The response also reinforces
the evidence given previously through various channels such as the Convention of
Scottish Local Authorities (COSLA), the Society of Local Authority Chief
Executives (SOLACE) and the Sustainable Scotland Network (SSN) as part of the
Net Zero Parliamentary enquiry, which has been reflected strongly in the recently
published findings in relation to the need for:
o Increased funding for local authorities as a key delivery vehicle for net-
zero
o Streamlining of the funding landscape
o Investment in grid capacity and simplifying of the process to unlock
municipal energy opportunities
254

Page 255

o Skills development and capacity
2.7 Subject to Cabinet approval, the response will be submitted to Scottish
Government in advance of the deadline for responses of 9 May 2023. 
3. Proposals 
3.1 That Cabinet approves the response at Appendix 1 as the North Ayrshire Council
response to the Scottish Government consultation in relation to the draft Energy
Strategy and Just Transition Plan. 
4. Implications/Socio-economic Duty 
Financial
4.1 There is no direct financial impact arising from the content of this report.   
Human Resources
4.2 There is no direct impact arising from the content of this report. 
Legal
4.3 None 
Equality/Socio-economic
4.4 There is no direct equality/socio-economic impact arising from the content of this
report. However, if implemented the proposals in the consultation document could
assist in meeting the Council’s socio-economic duty as set out in the Fairer
Scotland Duty and will help to create a fairer and more inclusive local economy.
Climate Change and Carbon
4.5 The proposals in the consultation document would make a positive contribution to:
• national carbon reduction targets, and
• to the North Ayrshire Council Climate Emergency declaration commitment to
be carbon neutral by 2030
Key Priorities 
4.6 The proposals in the consultation document may support the North Ayrshire
Council Plan priorities: 
• Active and strong communities
• Inclusive, growing and enterprising local economy 
• A sustainable environment; and
• People enjoy good life-long health and wellbeing 
Community Wealth Building 
255

Page 256

4.7 The proposals in the consultation document would support Community Wealth
Building aims of creating a fairer local economy central to our aims of tackling
climate change, poverty and inequality. 
5. Consultation 
5.1 A number of Council services were consulted and assisted in the preparation of
the draft response. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact David Hammond, Head of Sustainability,
Corporate Property & Transport, on 01294 324514. 
Background Papers 
1. Scottish Government’s draft Energy Strategy and Just Transition Plan  Draft
Energy Strategy and Just Transition Plan (www.gov.scot) 
256

Page 257

1 
North Ayrshire Council response to the Scottish Government’s draft Energy Strategy and Just Transition Plan – Consultation Appendix 2
Question Answer
Chapter 1 – Introduction and Vision
1. What are your views on the vision set out for 2030 and 2045? Are
there any changes you think should be made?
The Council welcomes and supports the Scottish Government’s vision to 2030, to reduce overall emissions by 75% (compared to 2019
levels), and by 90% by 2040.   
We also acknowledge the requirement to build Scotland’s renewable capacity and focus on decarbonising energy for heat, transport and
industry, on reforming energy markets to ensure energy security and affordability, and on maximising benefits for the transition to net zero
for economy and communities. 
We note the following ambitions to 2030/2045:
• An energy system that provides maximum community and economic benefits on route to delivering net zero
• 5GW hydrogen production
• Oil and gas production reduced to 35% of 2019 levels (by 2035)
• Increased level of renewables by a further 20GW
• Reduced greenhouse gas emissions to 20MtCO2e
• 2GW of community and locally owned energy
• Phase out need for new petrol and diesel cars and vans
• Equivalent of 50% of energy for heat, transport and electricity comes from renewable sources. 
By 2045:
• A net zero future – climate-friendly energy system provides affordable, clean energy to homes, businesses and communities.
As noted above, we broadly support the vision and Just Transition outcomes set out in the consultation paper, however, to ensure
Scotland can achieve this vision it is crucial to address the structural and economic barriers to a just transition. We would like particularly
to highlight the need for: 
• Increased funding for local authorities as a key delivery vehicle for net-zero
• Streamlining of the external grant funding landscape
• Investment in grid capacity, reduction of grid connection timescales and simplifying of the grid application process to unlock municipal
energy opportunities
• Skills development and capacity
North Ayrshire Council has set a carbon reduction target of achieving net zero area wide carbon emissions by 2030, and has set out a
route map to achieve this in our third Environmental Sustainability & Climate Change Strategy (ESCCS).  The strategy follows seven
thematic workstreams (Affordable Warmth, A Green Economy, Transport & Travel, Natural Environment, Sustainable Operations, Carbon
Absorption and Climate Change Adaptation) which align with the principles of the Draft Energy Strategy and Just Transition Plan. 
The fourth iteration of the ESCCS is in development, therefore we welcome the timing of this consultation to ensure local action supports
nation ambition. 
Chapter 2 – Preparing for a Just Energy Transition
257

Page 258

2 
2. What more can be done to deliver benefits from the transition to
net zero for households and businesses across Scotland?
The Council welcomes the proposed benefits outlined in the plan, specifically to:
• Maximise the economic benefits, including a pipeline of skills for net zero jobs
• Ensure fair distribution of opportunities, benefits and risks including community benefits, adapting to impacts of climate change
• Ensure and inclusive and fair process via co-design with stakeholders, trade unions and public 
We welcome the commitment to community benefits and consider that additional resource is required to support communities in utilising
the funds and delivering support projects from feasibility to completion. 
3. How can we ensure our approach to supporting community energy
is inclusive and that the benefits flow to communities across
Scotland?
In North Ayrshire, Locality Planning Partnerships are key to disseminating funds received through community benefits.  Engagement with
community groups to increase capacity and spread awareness of communities’ roles in tackling climate change, and to identify where
funding and resource to support implementation of projects, is needed.  It would be helpful to identify best practice and share this
amongst local authorities.
4. What barriers, if any, do you/your organisation experience in
accessing finance to deliver net zero compatible investments?
We would like to highlight the role of public sector led renewable energy generation projects which have significant potential to make a
major contribution in the journey to net-zero. Local authorities have access to land and buildings and the ability to raise capital on an
invest to save basis and to be creative in power off-take opportunities, for example entering into a sleeving agreement to use the power
supplied for their own estate, and/or supplying generated power to existing buildings or stimulating new development. 
A key barrier to unlocking this potential within local authorities and creating viable financial cases for investment is the lack of flexibility
within nationally procured energy supply contracts to use the power generated in the most efficient way. See further information in the
response to question six below. 
We are also of the view that timescales for external grant funding applications can be prohibitive, and the funding landscape could be
streamlined to reduce complexity and widen the scope of eligible projects. 
5. What barriers, if any, can you foresee that would prevent you/your
business/organisation from making the changes set out in this
Strategy?
We would welcome addition resource to implement action, not only within the Council but to support local businesses and communities. 
Some of the key challenges faced by local authorities are: 
• Electricity grid capacity and timescales – at present there is limited spare capacity in some areas, the infrastructure is outdated
and requires to be upgraded.  The transition to Electric Vehicles and the decarbonisation of heat will significantly add to the
electrical demand on the network and this will need to be addressed. The timescales for the application process to the grid is also
prohibitive and puts pressure on the viability of business cases for renewable energy generation projects. 
• Workforce knowledge and expertise – the ability to fund, recruit and retain the skills necessary, with the latter being in short supply
in the labour market. There is a need to significantly upskill workforce and increase their levels of expert resource to plan,
develop, lead and drive change at the scale and pace required to reach the net zero targets. Emerging technologies such as
hydrogen require expert knowledge. In addition, the latest global market volatility highlights the importance of energy market
intelligence and analysis.
• At present, the analysis of costs from current non-domestic projects is indicating that achieving enhanced levels of energy
performance and sustainability, such as BREEAM Outstanding, Passivhaus and SFT – Net Zero Public Sector Buildings (NZPSB)
standard, in order to meet net zero targets, are proving to be cost prohibitive. It is acknowledged the buildings we deliver need be
more efficient, higher performing, net zero buildings if net zero is to be achieved however the costs associated with delivering this
is a challenge. There are supply chain barriers too (cost, availability and understanding of technology) which need national
solutions/incentives to overcome in order to mainstream Local, bespoke solutions will not work for all emission sources. 
6. Where do you see the greatest market and supply chain
opportunities from the energy transition, both domestically and on
an international scale, and how can the Scottish Government best
support these?
Urgent action is needed to support local authorities in the uptake of emerging and existing large-scale renewable projects. Action is
required to improve the national Supply of Electricity Framework as it does not allow for sleeving of electricity, even though utility
companies do offer such an agreement outwith the framework.  Requests to include the provision for sleeving have been repeatedly
made to Scottish Procurement, prior to the forthcoming framework in 2024.  This represents a barrier to local authorities pursuing large
258

Page 259

3 
scale renewable projects, as it limits flexibility within business cases for off-take of the power. Furthermore, action is required to improve
the electricity network to allow uptake of new solar farms and resource provided to DNOs to reduce the lead in time for grid connections. 
The National Grid and DNO element of our own solar farm developments is currently considered another barrier. In order to support
increased capacity, the market needs to see what the demand map looks like, which is currently uncertain given all the challenges noted
above re ambition, grid capacity, grid constraints etc.
Consideration must also be given to biodiversity and embodied carbon when engaging with the market and supply chains.
7. What more can be done to support the development of sustainable,
high quality and local jobs opportunities across the breadth of
Scotland as part of the energy transition?
We welcome the aspiration for Scottish Government to work collaboratively with existing oil and gas businesses, low carbon and
renewable energy businesses, across further and higher education and with local authorities to maximise the potential of the energy
industry and areas such as the North East and Shetland, however we would offer that the energy sector is encouraged to work with
further and higher education to set out the skills required and courses available across Scotland.
8. What further advice or support is required to help individuals of all
ages and, in particular, individuals who are currently under-
represented in the industry enter into or progress in green energy
jobs?
The energy sector could be encouraged to support the promotion of education and training opportunities, in partnership with Scottish
Government. Engagement at secondary school level would be welcomed to motivate and inspire young people to pursue higher education
and careers in renewable energy sector.  This investment in the renewable energy sector would also support one of the ‘Sustainable
Development Goals’.
Chapter 3 – Energy supply
Scaling up renewable energy
9. Should the Scottish Government set an increased ambition for
offshore wind deployment in Scotland by 2030? If so, what level
should the ambition be set at? Please explain your views.
Current ambition to achieve 8-11GW of offshore wind by 2030, however there is capacity (operational, pipeline and potential pipeline) up
to 43.66GW. The impact to marine biodiversity must be addressed when considering a revised target and when considering applications
for potential offshore marine turbines.
10. Should the Scottish Government set an ambition for offshore wind
deployment in Scotland by 2045? If so, what level should the
ambition be set at? Please explain your views.
Yes, however robust consideration to marine biodiversity must be at the forefront of any planning decision. 
11. Should the Scottish Government set an ambition for marine energy
and, if so, what would be an appropriate ambition? Please explain
your views.
Yes, no one technology will provide Scotland’s clean, affordable energy demand.  Therefore, a mix of renewable sources is required.
Wave and Tidal energy will require additional resource to support greater uptake.   Furthermore, marine energy is highly predictable
which will help balance the generation from more intermittence resources.
Figure 17 in the consultation suggests the current operational wave and tidal systems have a capacity of 20MW, with 130MW awaiting
construction, and a further 220MW in planning stage.  However, the draft marine energy vision for Scotland indicates industry
recommend a target of 40MW from tidal by 2027 and testing 4 wave convertors or 250kW each by 2027, which is a target supported by
the Council and led by industry experts.  We would welcome clarification on the proposed target.
12. What should be the priority actions for the Scottish Government
and its agencies to build on the achievements to date of Scotland’s
wave and tidal energy sector?
Yes, to continue the Scottish Marine Energy Industry Working Group to help realise the proposed GVA opportunities for the UK (between
£4.9bilion and £8.9 billion by 2050), continue support for industry and academia, and maximise Scotland’s position in the emerging global
marine market, whilst protecting marine biodiversity.   
259

Page 260

4 
13. Do you agree the Scottish Government should set an ambition for
solar deployment in Scotland? If so, what form should the ambition
take, and what level should it be set at? Please explain your views.
Yes, as no one technology should be relied on to support Scotland’s clean, affordable energy demand.  411MW of solar are reported as
being operational with an additional approx.770MW in the pipeline. However, urgent action is needed to support local authorities in the
uptake of large-scale renewable projects such as solar farms.  Action is required to improve the national Supply of Electricity Framework
as it does not allow for sleeving of electricity, albeit utility companies do offer such an agreement, out with the framework.  Requests to
include the provision for sleeving have been repeatedly made to Scottish Procurement, prior to the forthcoming framework in 2024.  This
represents a barrier to local authorities pursuing large scale renewable projects, as maximum returns cannot be achieved to support
business cases and nor will they be for the next 3-5years under the new framework.  Furthermore, action is required to improve the
electricity network to allow uptake of new solar farms and resource provided to DNO’s to reduce the lead in time for grid connections. 
The National Grid and DNO element of solar farm development is currently considered another barrier.  Consideration must also be given
to the land use when considering large scale solar farm projects.  North Ayrshire Council are currently developing two solar PV farm
projects on former landfill sites and have first hand experience of the complexities relating to power purchase agreements and grid
connections.
14. In line with the growth ambitions set out in this Strategy, how can
all the renewable energy sectors above maximise the economic
and social benefits flowing to local communities?
We would welcome greater clarity on the non-domestic rates exemption linked to community benefit.  Having engaged with the Scottish
Assessors regarding this element, there remains uncertainty over eligibility.  This would support the inclusion of a community fund
provision for large scale renewable developments, which could be used to support fuel poverty and low carbon projects in communities
and schools.  Clear guidance on eligibility would be welcomed.
15. Our ambition for at least 5 GW of hydrogen production by 2030 and
25 GW by 2045 in Scotland demonstrates the potential for this
market. Given the rapid evolution of this sector, what steps should
be taken to maximise delivery of this ambition?
Delivery of the Scottish Hydrogen Action Plan to achieve this target of 5GW of hydrogen (15% of Scotland’s energy demand). The action
plan sets out actions that will be taken over the next five years to support the development of a hydrogen economy while ensuring a just
transition. The commitment is to:
• Invest in early projects, encouraging public and private sector to work together to demonstrate these technologies as much of the
learning takes place before a single molecule of hydrogen is even produced
• Build relationships, gaining valuable knowledge of how to work with others to assess, approve, consent and regulate these projects,
as well as to address deployment constraints and challenges, including high production costs
• Mobilise investment, continuing to support projects on the journey to decarbonisation. 
The plan states that £100 million of funding has been made available for renewable hydrogen projects, and we welcome the
acknowledgement of the hierarchy for hydrogen use in order to help to decarbonise sectors which are difficult to electrify and playing a
key role in energy-intensive industry. We acknowledge the level of existing natural gas infrastructure which has significant potential for re-
purposing.
We further support the Scottish Government’s statement regarding no new hydrogen production will be supported where CO2 is
unabated, however would welcome further clarity on the implication for private sector projects which are not supported by Scottish
Government funding.  Investment needs to be focussed on green hydrogen, therefore we support the opposition to continued use of
unabated fossil fuels to generate electricity.  The Local Development Plan may have a role to play in supporting this ambition at a local
level.
16. What further government action is needed to drive the pace of
renewable hydrogen development in Scotland?
Continued engagement with academia and industry. As a local authority with high net zero ambition, we would welcome the opportunity
to maximise uptake of affordable green hydrogen and supporting infrastructure.  We have engaged with Strathclyde University on this,
however there is perhaps a role for Sustainable Scotland Network to support learning across local authorities, particularly for those more
rural.  Consideration is needed for Council housing stock and the long-term plans for heat decarbonisation, and further guidance would
be welcomed on a just transition from gas to hydrogen.
17. Do you think there are any actions required from Scottish
Government to support or steer the appropriate development of
bioenergy?
Yes, and we welcome the review to scale up domestic biomass supply chains, with the support of a Bioenergy Policy Working Group. 
In addition, we welcome the announcement that a strategic framework for the most appropriate use of bio-resources will be published in
the Bioenergy Action Plan.
260

Page 261

5 
18. What are the key areas for consideration that the Scottish
Government should take into account in the development of a
Bioenergy Action Plan?
The key consideration here is our biodiversity and protecting our natural environment. We welcome the aim of using bioenergy only
where it can be most effective in reducing emissions and where there is greatest need for alternatives to fossil fuels. We also support the
longer-term vision of the use of bioenergy with carbon capture technology where possible. 
19. How can we identify and sustainably secure the materials required
to build the necessary infrastructure to deliver the energy strategy?
Sustainable procurement, life cycle analysis and embodied carbon should all be considered.  Equally as important is bringing local
authorities on the journey, utilising the Sustainable Scotland Network and Scottish Energy Officers Network to engage with, support and
encourage local authority officers to deliver ambitions at local levels.
North Sea Oil and Gas
20. Should a rigorous Climate Compatibility Checkpoint (CCC) test be
used as part of the process to determine whether or not to allow
new oil and gas production?
N/A
21. If you do think a CCC test should be applied to new production,
should that test be applied both to exploration and to fields already
consented but not yet in production, as proposed in the strategy?
N/A
22. If you do not think a CCC test should be applied to new production,
is this because your view is that: N/A
• Further production should be allowed without any restrictions
from a CCC test;
N/A  • No further production should be allowed [please set out why]; 
• Other reasons [please provide views].
23. If there is to be a rigorous CCC test, what criteria would you use
within such a test? In particular [but please also write in any further
proposed criteria or wider considerations ]
N/A
• In the context of understanding the impact of oil and gas
production in the Scottish North Sea specifically on the global
goals of the Paris Agreement, should a CCC test reflect –
N/A
A) the emissions impact from the production side of oil and gas
activity only; N/A
B) the emissions impact associated with both the production and
consumption aspects of oil and gas activity (i.e. also cover the
global emissions associated with the use of oil and gas, even if
the fossil fuel is produced in the Scottish North Sea but
exported so that use occurs in another country) – as proposed
in the Strategy;
N/A
C) some other position [please describe]. N/A
• Should a CCC test take account of energy security of the rest of
the UK or European partners as well as Scotland? If so, what
factor would you include in the assessment, for example should
this include the cost of alternative energy supplies?
N/A
261

Page 262

6 
• Should a CCC test assess the proposed project’s innovation
and decarbonisation plans to encourage a reduction in
emissions from the extraction and production of oil and gas?
N/A
• In carrying out a CCC test , should oil be assessed separately to
gas? N/A
24. As part of decisions on any new production, do you think that an
assessment should be made on whether a project demonstrates
clear economic and social benefit to Scotland? If so, how should
economic and social benefit be determined?
N/A
25. Should there be a presumption against new exploration for oil and
gas? N/A
26. If you do think there should be a presumption against new
exploration, are there any exceptional circumstances under which
you consider that exploration could be permitted?
N/A
Chapter 4 Energy demand
Heat in Buildings
27. What further government action is needed to drive energy
efficiency and zero emissions heat deployment across Scotland?
The Council welcomes the ambition that by 2030 Scotland’s main energy using sectors will use energy more efficiently, and that what is
used will be decarbonised. We also support the ambitious targets set across buildings, transport, industry, and agriculture.
We recognise the need for carbon capture, utilisation and storage (CCUS) to be developed and welcome the continued support provided
to industry.
It is noted that Scottish Government do not consider that hydrogen will play a central role in decarbonising heat.  This is an important
declaration and provides clarity for local authorities on decarbonising heat in housing stock. However, challenges remain in terms of the
capital costs of alternative low carbon technology, alongside maintenance and operation costs, as well as fabric investments required to
ensure the efficiency of such technology can be achieved. Local authorities have significant domestic and non-domestic estates and
financial support will be required to fund the transition to net-zero/ZDE emissions in buildings. 
The Council has undertaken two LHEES pilot projects and is currently developing the 1st mandatory LHEES and Delivery Plan.  This has
been made possible by the resource funding provided by Scottish Government, not only to help produce the report but to allow for job
creation in the form of a temporary LHEES officer post, to achieve the agreed outcomes from the LHEES.  This level of financial support
is gratefully received, allowing limited resource to be well positioned to fulfil other zero carbon objectives simultaneously.
In addition, sharing best practice, guidance and practical support through existing networks such as the Sustainable Scotland Network, or
Scottish Energy Officer Network, would be helpful.
Energy for transport
28. What changes to the energy system, if any, will be required to
decarbonise transport?
The two key alternative fuels currently in the marketplace for road transport vehicles are electricity or hydrogen, the production and
distribution of both fuel types must be readily available within the appropriate geographical logistical areas to make the transition a
success, alongside provision of financial support for local authorities to meet the increased capital cost associated with alternative fuel
vehicles.
29. If further investment in the energy system is required to make the
changes needed to support decarbonising the transport system in
Scotland, how should this be paid for?
We recognise that there is a role for the private sector to leverage in investment, where this is viable. Where it is not viable, public
intervention will be required. An example is the Electric Vehicle Infrastructure Fund, that North Ayrshire is actively developing an
application for, and which is designed to stimulate private sector investment in net-zero. We consider that for heavier vehicle fleet,
hydrogen is likely to be a more viable solution, and significant investment in vehicles, hydrogen generation, distribution and fuelling
262

Page 263

7 
infrastructure will be required and initially this is only likely to come from public funding in the early stages (as has been the case for
electric vehicle charging infrastructure). 
30. What can the Scottish Government do to increase the sustainable
domestic production and use of low carbon fuels across all modes
of transport?
As above.
31. What changes, if any, do you think should be made to the current
regulations and processes to help make it easier for organisations
to install charging Infrastructure and hydrogen/low carbon fuel
refuelling infrastructure?
North Ayrshire Council are participating in one of Transport Scotland’s six EV Infrastructure Pathfinder projects, supported by the Scottish
Futures Trust, to determine alternative models to support the growth of EV infrastructure.  The results of the pathfinder project should be
used to support changes in processes to make it easier for local authorities to provide charging infrastructure for EV users across
Scotland.
32. What action can the Scottish Government take to ensure that the
transition to a net zero transport system supports those least able
to pay?
There is a need to provide additional financial support for the procurement of alternative fuelled vehicles due to their current higher cost
or introduce new policy levers to bring the cost of alternative fuelled vehicles to make them comparative to fossil fuel counterparts. 
33. What role, if any, is there for communities and community energy
in contributing to the delivery of the transport transition to net zero
and, what action can the Scottish Government take to support this
activity?
Community (renewable) energy can help to decarbonise the UK’s energy system by generating low carbon electricity that feeds into the
electricity grid. Community renewable energy generation can help meet increasing electricity demand caused by the electrification of
transport. 
The electrification of transport will increase electricity demand significantly. Climate Change Committee estimates by 2050 EVs are
expected to introduce an additional 65-100TWh of annual electricity demand to the system, or an increase of 20-30% over today’s levels
(‘Enabling the transition to electric vehicles: the regulator’s priorities for a green fair future’, OFGEM, 2021)
Community energy projects can also increase resilience and reliability of electricity supply.
34. Electric vehicle batteries typically still have around 80% of their
capacity when they need replacing and can be used for other
applications, for example they can be used as a clean alternative to
diesel generators. What, if anything, could be done to increase the
reuse of these batteries in the energy system?
Provide further promotion and case studies on future application. 
Energy for agriculture
35. What are the key actions you would like to see the Scottish
Government take in the next 5 years to support the agricultural
sector to decarbonise energy use?
N/A
Energy for Industry
36. What are the key actions you would like to see the Scottish
Government take in the next 5 years to support the development of
CCUS in Scotland?  
It is important to note achieving net zero emissions requires a combination of reduction of emissions generated and the removal of
residual emissions and therefore a clear plan to remove these residual emissions is required. 
We strongly agree that carbon capture, utilisation and storage will be essential for capturing residual emissions in our energy system and
that CCUS will play a role in reducing emissions in hard to decarbonise industrial sectors that cannot electrify their industrial processes.
Therefore, we believe further work should focus on advancing CCUS technologies. So CCUS could be deployed at a large scale,
however, it needs to become investable in the short term. 
263

Page 264

8 
37. How can the Scottish Government and industry best work together
to remove emissions from industry in Scotland? As stated above.
38. What are the opportunities and challenges to CCUS deployment in
Scotland? As stated above.
39. Given Scotland’s key CCUS resources, Scotland has the potential
to work towards being at the centre of a European hub for the
importation and storage of CO2 from Europe. What are your views
on this?
As stated above.
Chapter 5: Creating the conditions for a net zero energy system
40. What additional action could the Scottish Government or UK
Government take to support security of supply in a net zero energy
system?
Improvements to the electricity grid and support for local authority ambition through nationally procured frameworks.
41. What other actions should the Scottish Government (or others)
undertake to ensure our energy system is resilient to the impacts
of climate change?
Having begun our journey through Adaptation Scotland’s Capability Framework in 2022/23, we would recommend undertaking this
process to improve resilience at a local level.  Moreover, having an energy system consisting of various renewable technologies rather
than relying on a single source, will support sustained energy provision.
Chapter 6: Route map to 2045
42. Are there any changes you would make to the approach set out in
this route map? No changes, the route map is a robust visual representation, and sets out a clear path to 2045. 
43. What, if any, additional action could be taken to deliver the vision
and ensure Scotland captures maximum social, economic and
environmental benefits from the transition?
N/A
Impact assessment questions
44. Could any of the proposals set out in this strategy unfairly
discriminate against any person in Scotland who shares a
protected characteristic? These include age, disability, sex, gender
reassignment, pregnancy and maternity, race, sexual orientation,
religion or belief.
We welcome the development of a series of impact assessments. 
We acknowledge that there will be a finalised policy position based on conclusion of this process.
264

Page 265

9 
45. Could any of the proposals set out in this strategy have an adverse
impact on children’s rights and wellbeing? As stated above.
46. Is there any further action that we, or other organisations (please
specify), can take to protect those on lower incomes or at risk of
fuel poverty from any negative cost impact as a result of the net
zero transition?
Potential impact of increased operational costs from changing from gas heating to renewables.
47. Is there further action we can take to ensure the strategy best
supports the development of more opportunities for young people? Ensuring continued engagement with young people.
Just Transition energy outcomes
48. What are your views on the approach we have set out to monitor
and evaluate the Strategy and Plan? This approach seems robust.
49. What are your views on the draft Just Transition outcomes for the
Energy Strategy and Just Transition Plan?
We broadly support the vision, wide policy statements and Just Transition outcomes set out in the consultation paper. 
However, to ensure Scotland can achieve this vision it is crucial to address the structural and economic barriers to a just transition. We
would like particularly to highlight the need for: 
• Increased funding for local authorities as a key delivery vehicle for net-zero.
• Streamlining of the funding landscape.
• Investment in grid capacity and simplifying of the process to unlock municipal energy opportunities.
• Skills development and capacity.
50. Do you have any views on appropriate indicators and relevant data
sources to measure progress towards, and success of, these
outcomes?
We would welcome a combination of social, economic, and environmental indicators to track progress towards achieving a just transition
in Scotland, such as: 
• Overall carbon emissions (tonnes) per capita 
• Renewable electricity: Installed Capacity 
• Total final energy consumption 
• Percentage of households in fuel poverty 
• Percentage of working age population in employment (Employment Rate) 
• Workforce jobs by industry 
265

Page 266

266

Page 267

NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet
Title: Advertising and Sponsorship Framework
Purpose: To seek Cabinet approval of the proposed Advertising and
Sponsorship Framework for council assets. 
Recommendation: That Cabinet: 
i. approves the proposed Advertising and Sponsorship
Framework attached at Appendix 1; and
ii. notes advertising opportunities will be progressed on Council
assets in line with the principles of the Framework, including
the expansion of the existing roundabout advertising scheme
and the progression of advertising on the Council’s refuse
collection vehicles and wider vehicle fleet; and
iii. agrees that officers will investigate and introduce further
advertising opportunities as appropriate and in line with the
principles of the proposed Framework; and
iv. agrees that delegated authority be provided to the Executive
Director (Place) to exercise any necessary functions in
relation to implementation of the Advertising and
Sponsorship Framework. 
1. Executive Summary 
1.1 Cabinet approved a Roundabout Advertising pilot in 2019 to test the viability of offering
advertising space to help the promotion and recognition of businesses. The
roundabout initiative has proved to be extremely successful with all but one available
location being taken by local businesses within a week of becoming available. 
1.2 The opportunity to expand the scheme to include additional roundabouts together with
other Council assets, such as our vehicle fleet, has been investigated. It has been
identified that such opportunities could be progressed which would provide cost
effective local advertising facilities for businesses which would assist in increasing their
business profile, help their recovery strategies from the pandemic and support the
Community Wealth Building approach, particularly the ‘Land and Assets’ pillar. There
are also opportunities for businesses to contribute to making the area more attractive
and colourful and improving their local environment, through the sponsorship of
planting schemes at floral beds. 
1.3 A key consideration in offering advertising opportunities on Council assets is ensuring
any arrangements are ethical, consistent and aligned to the Council’s principles and
Agenda Item 15
267

Page 268

priorities. A draft Advertising and Sponsorship Framework has been developed and
attached as Appendix 1. This Framework would govern future advertising initiatives. 
2. Background 
2.1 As businesses emerge from the pandemic, opportunities for cost-effective approaches
to advertising have become a key element of recovery strategies. The demand for local
advertising and sponsorship opportunities has been high and clearly demonstrated
through the rapid take up of advertising on roundabouts and the early interest in other
opportunities. With the additional impacts of the current global and local economic
position, the provision of opportunities at reasonable cost for businesses to promote
their brand, services and products has become ever more critical. 
2.2 The proposed Advertising and Sponsorship Framework at Appendix 1 is designed to: 
• provide a reference point for decision making on new sponsorship and advertising
opportunities;
• set out sound principles in terms of the approach to sponsorship and advertising on
Council assets;
• provide robust safeguards to uphold the Council’s reputation and corporate
identity, and protect the Council;
• outline and agree the areas for exploration and appraisal of new sponsorship and
advertising opportunities. 
2.3 Through the Roundabout Advertising pilot, agreed by Cabinet in 2019, officers have been
working with a private sector partner to help businesses promote themselves through
advertising on roundabouts. This provides an opportunity for businesses to gather more
support, custom and brand awareness, through advertising to the tens of thousands of
people passing through the North Ayrshire roundabouts each year, appealing to residents,
tourists, and businesses alike. The success of this pilot has exceeded expectation. 
2.4 In the initial phase, 29 locations were approved by Cabinet for potential use. This list
was refined after the procurement of an advertising partner, who identified from their
experience that some of the proposed locations were unlikely to be economically
viable. Of the original 29 locations, 24 were subsequently granted Planning permission,
with 23 advertising locations being sold within one working week of becoming
available. This is an indication that the demand for the opportunity is high and is seen
as contributing to local economic recovery in a direct way. Local businesses that have
committed to the initiative include restaurants, taxi firms, social care providers, retail,
professional services and other service outlets. The high level of demand and business
involvement has demonstrated the potential for an immediate extension of provision
across suitable locations in the rest of North Ayrshire. As advertising agreements are
renegotiated and extended, evidence of business benefits will be collected. 
2.5 Given the success of this pilot, it is proposed that officers identify further suitable
roundabout locations across North Ayrshire for implementation. 
2.6 A further opportunity building on our approach to date has been identified around
utilising refuse collection vehicles, for advertising. Intelligence from other local
authorities has identified an opportunity to offer advertising space to businesses on
268

Page 269

these vehicles. Working with a private sector partner, at no cost, this would be a 100%
performance related contract with an agreed share of revenue. It is proposed that the
28 refuse collection vehicles in the waste fleet would be included. These vehicles are
highly visible throughout the area and visit every house on a weekly basis. With the
ongoing home working practices continuing as a result of the pandemic, visibility is
ever increasing as more people are at home during the day. 
2.7 The introduction of advertising on refuse collection vehicles will be carefully managed
to ensure the ongoing ‘Right Stuff Right Bin’ and other recycling information would not
be compromised. 
2.8 The roll out across the full North Ayrshire Council wider vehicle fleet will also be
progressed and modelled on different levels of commercial interest and viability, but
the principles established through the proposed advertising on refuse collection
vehicles will provide valuable learning. A full review of market potential and vehicle
suitability will be carried out to inform further expansion opportunities. 
2.9 Benefits of advertising on refuse collection vehicles include:
-Opportunities for businesses to raise their profile and reputation with local people and
communities;
-Supporting local businesses, people and contributing to the local economy;
-Pursuing opportunities for securing best value and reinvestment in local sustainable
waste services and the development of future services and opportunities;
-Supporting the Council’s ‘Keep it Local’ campaign by promoting local businesses’ 
-Continuing to facilitate local waste campaigns such as ‘Right Stuff, Right Bin’ and
other recycling initiatives. 
2.10 It is anticipated that advertising on refuse collection vehicles will go live in summer
2023 with advertising on the wider Council fleet to follow. A North Ayrshire Council web
page and targeted social media campaign will be developed to position and promote
advertising opportunities at a reasonable cost for businesses. The Council’s Business
Advisors will also be briefed and provided with promotional materials to further facilitate
local business involvement. The principles set out within the Advertising and
Sponsorship Framework at Appendix 1 will be applied. 
2.11 It is proposed that future and implementation of projects within the Advertising and
Sponsorship Framework will be agreed by the Executive Director (Place), or the Head
of Service (Neighbourhood Services), by Delegated Authority where the value and
associated risk is assessed as low by a robust business case. 
3 Proposals 
3.1 It is proposed that Cabinet: 
• approves the proposed Advertising and Sponsorship Framework attached at
Appendix 1; and
• notes advertising opportunities will be progressed on Council assets in line with
the principles of the Framework, including the expansion of the existing
roundabout advertising scheme and the progression of advertising on the
269

Page 270

Council’s refuse collection vehicles and wider vehicle fleet; and
• agrees that officers will investigate and introduce further advertising
opportunities as appropriate and in line with the principles of the proposed
Framework; and
• agrees that delegated authority be provided to the Executive Director (Place) to
exercise any necessary functions in relation to implementation of the Advertising
and Sponsorship Framework 
4 Implications/Socio-Economic Duty 
Financial 
4.1 Advertising on Refuse Collection Vehicles and the full North Ayrshire Council fleet will
generate anticipated income of £100,000 as agreed at the Council meeting on 15
February 2023. 
Human Resources 
4.2 Delivery models will be identified through a robust business case and will be either
in partnership with a private sector provider or in house through existing resources. 
Legal 
4.3 Regulatory considerations and the adherence to the Local Government (Scotland)
Act 2003 will be adhered to in furthering and implementing the proposals under the
Framework. 
Equality/Socio-economic 
4.4 This proposal will provide promotional opportunities for local businesses, and
other businesses, which in turn will help sustain local employment and contribute
to the Council’s socio-economic duty. 
Climate Change and Carbon 
4.5 This proposal will indirectly increase the visibility of waste services and
environmental messaging thereby supporting our environmental and sustainability
aspirations. 
Key Priorities 
4.6 The proposals support the Council Plan strategic priority to create a growing, inclusive and
enterprising economy by providing new opportunities for businesses to promote their
organisation. The use of Council assets in this way supports the priority to be an efficient
Council that maximises resources and provides value for money. 
Community Wealth Building 
4.7 This proposal supports Community Wealth Building by providing opportunities to
270

Page 271

support businesses through additional promotional opportunities and, aligned to the
‘Land and Assets’ pillar, will identify and implement new, sustainable approaches to
the utilisation of Council assets. 
5 Consultation 
5.1 Consultation with officers attending the Cross-Council Municipalisation Group from
Democratic Services (Legal), Finance (Procurement, Insurance), Economic
Development & Regeneration (Business Support), Commercial Services (Transport)
has taken place. In addition, the Policy Advisory Panel (PAP) was consulted in the
preparation of this report. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Neighbourhood
Services, on 01294 324890. 
Background Papers 
Appendix 1 Advertising and Sponsorship Framework
271

Page 272

Appendix 1 
North Ayrshire Council
Advertising & Sponsorship Framework
Introduction 
This Framework outlines guiding principles that will be followed in providing
advertising and sponsorship opportunities on council assets. 
In developing the approach to offering advertising and sponsorship opportunities, 
Cabinet approved a Roundabout Advertising pilot in 2019 as a first step to provide
promotion and recognition opportunities for local businesses and to deliver best
value for the Council. 
As part of ongoing efforts to drive forward this approach, further advertising and
sponsorship opportunities have emerged that can provide businesses cost-effective
and local opportunities to increase their business profile and contribute to their
recovery strategies. For North Ayrshire Council there is the potential to establish
innovative and sustainable business models that can support businesses and
provide best value through maximisation of our assets and resources. 
The Advertising and Sponsorship Framework is designed to provide a framework
for an approach to new advertising and sponsorship opportunities that is ethical,
consistent and aligned to the Council’s principles and priorities. 
Operation & Governance 
When potential opportunities are identified the Business Development Manager
(Place) will work with appropriate council services and develop a robust Business
Case.
Once this Business Case is complete, if viable and associated risk is determined as
low, approval will be sought for implementation within the Advertising and
Sponsorship Framework from the Executive Director (Place), or the Head of
Neighbourhood Services, by Delegated Authority. 
Principles 
Advertising is defined in this commercial context as an agreement between North
Ayrshire Council (or its partner) and an advertiser, whereby the Council receives
direct or indirect payment from an advertiser (being a business or organisation) for
an advertisement on Council assets including outdoor, public realm, broadcast,
publications or electronic media to promote a product (or service) to potential and
current customers.
272

Page 273

Appendix 1 
Sponsorship differs from advertising and can be defined in this context as an
agreement between the Council and the sponsor, where the Council receives
payment for association and support of a local asset where the sponsor benefits
from potential recognition and publicity.
In implementing advertising and sponsorship, North Ayrshire Council will:
Be consistent:
1. Establish a consistent approach and set of standards
2. Provide a framework of controls
3. Ensure compliance with legislation, advertising industry codes and
other Council policies and guidelines 
Protect reputations:
4. Safeguard the corporate identity, image and reputation of the Council
5. Ensure compliance with all legal and other obligations
6. Align with strategic vision and priorities to contribute to key outcomes 
Boost opportunities:
7. Secure best value and maximise opportunities
8. Support development of positive commercial relationships with private
sector partners 
Safeguards 
Clear safeguards will be applied to policy and practices to assure control,
compliance, protection and to minimise potential risk in the implementation and
management of all North Ayrshire Council’s commercial advertising and sponsorship
initiatives. This Framework is fully aligned to the duty to promote Best Value
contained in the Local Government in Scotland Act 2003. 
All North Ayrshire Council advertising and sponsorship initiatives will have controls
and disclaimers in place to uphold the Council’s reputation and corporate identity,
avoid implied endorsement and protect the Council. 
All advertising and sponsorship agreements and publicity will include a statement
that North Ayrshire Council’s functions will continue to be conducted fully and
impartially, notwithstanding the existence of an advertisement or sponsorship
arrangement. Acceptance of advertising or sponsorship does not imply any
endorsement of the advertiser’s or sponsor’s products or services by the Council. 
The principles of fairness and impartiality will be upheld through an approach that
ensures that businesses that comply with legislation, advertising industry codes and
all appropriate Council policies and guidelines can pursue an opportunity.
273

Page 274

Appendix 1 
Clarity of promotion, messaging, branding and advertising will be important. This will
ensure there is no confusion between Council branding and business
advertisements. Professionalism and skills will be paramount with responsibilities
under the guidelines laid down by the Advertising Standards Authority reinforced. 
In addition, North Ayrshire Council retains the right to refuse advertising or
sponsorship on the grounds that, in the Council’s sole opinion, it is inappropriate, it
conflicts with services already provided by the organisation or it is incompatible with
the Council’s values and strategic priorities. The Council reserves the right to
terminate arrangements including the removal of non-compliant advertising at any
time. 
Approval 
North Ayrshire Council have adopted a Control of Advertisement Policy. This
document provides control and advice on advertisements requiring a planning
application and express consent. Full details on submitting a planning application for
outdoor advertising is available online via the North Ayrshire Council website at
https://www.north-ayrshire.gov.uk/planning-and-building-standards/advertisement-
consent.aspx. 
North Ayrshire Council will not permit advertising or sponsorship that represents a
conflict of interest or is likely to cause offence. There should be no real or apparent
conflict between the objectives and community goals of the Council and those of the
advertiser or sponsor. Care will be taken to ensure any advertising or sponsorship
opportunities are cognisant of protected characteristics including age, disability,
gender reassignment, marriage and civil partnership, pregnancy and maternity, race,
religion or belief, sex, and sexual orientation. Political campaign materials will not be
permitted in any commercial advertising and sponsorship, in line with Council policy.
Content that is not permitted for advertising includes, but is not limited to, content
that contains, infers or suggests any of the following: 
1. Advocacy of, or opposition to, any politically, environmentally or socially
controversial subjects or issues
2. Political advocacy, opposition and publicity (being material which in whole or
in part, appears to be designed to effect political support of a political party)
or campaigning materials
3. Disparagement or promotion of any person or class of persons
4. Promotion or incitement of illegal, violent or socially undesirable acts
5. Promotion or availability of tobacco, alcohol products, weapons, gambling or
illegal drugs
6. Advertising of financial organisations and loan advancers which meet the
Financial Standards Authority’s definition of High Cost Short Term (HCST)
7. Promotion or availability of services, products, activities or materials with an
adult or sexually explicit content advertising that infringes any trademark,
copyright, patent rights or consumer protection laws 
The Council will not permit advertising or sponsorship arrangements in the following
situations: 
274

Page 275

Appendix 1 
1. When companies are in live contract negotiations with the Council
2. When companies have a current planning application or planning
matter before the Council that may cause a conflict of interest or be
subject to or likely to be subject to a dispute with the Council’s
regulation or planning services or who owe the Council a debt
3. In all scenarios where it is legally permissible, North Ayrshire Council
will refuse applications from companies who are in dispute with the
Council or where there is pending or active legal action 
Example Approved Projects 
Advertising on Roundabouts 
North Ayrshire Council is working with a private sector partner to promote
businesses through advertising on roundabouts. This provides an opportunity for
businesses to gather more support, custom, and brand awareness, through
advertising to the tens of thousands of people passing the North Ayrshire
roundabouts each year, whilst appealing to residents, tourists, and businesses alike. 
In the initial phase 24 locations were granted planning permission and within a week
23 advertising locations were sold. All but one is local companies benefitting from the
initiative, including restaurants, taxi firms, social care, retail and service outlets. This
high level of demand and business involvement has demonstrated the potential for
an immediate expansion of the pilot across North Ayrshire. 
This partnership model involving a private sector market leader provides a no cost
and minimal risk contract to North Ayrshire Council. 
Sponsorship of Floral Beds 
North Ayrshire Council has created an opportunity to businesses to contribute to
making the area more attractive and colourful and improving their local environment,
by approving the sponsorship of planting schemes at floral beds. 
With a small number of floral beds available in the Irvine area, businesses can
choose the best and most relevant location for their business. As the sole sponsor of
a floral bed, their commitment will be recognised by appropriate signage that will
reach a wide and varied audience for a full year.
275

Page 276

Appendix 1 
For businesses, sponsoring floral beds in Irvine is a positive way to promote a
company and demonstrate a commitment to the local area.
This will also be expanded across North Ayrshire. 
Next Steps 
As businesses emerge from the pandemic, opportunities for cost-effective
approaches to advertising and sponsorship have become a key element of recovery
strategies. The demand for local advertising and sponsorship opportunities has been
clearly demonstrated through the rapid uptake of advertising and sponsorship
opportunities across North Ayrshire. 
Council advertising and sponsorship initiatives can make an important contribution to
promote, support and revitalise the North Ayrshire high streets and local economy in
the wake of the pandemic and the challenges posed by the recession by providing
low-cost marketing and promotional opportunities for local businesses. 
This Framework will contribute to North Ayrshire Council’s commitment to the ‘Keep
it Local’ campaign and support businesses, primarily local businesses, through this
challenging time. Consequently, where advertising and sponsorship approaches
have been identified and appraised appropriately, it is essential that the Council can
act quickly to implement to ensure that these opportunities are available to local
businesses. 
There are three basic models for the implementation of advertising and sponsorship
approaches that can be considered. A partnership approach with an experienced
partner, an internal model delivered by Council staff or a mix of both can all be viable
options. Emerging opportunities should be considered on a case by case basis with
the partnership approach reducing risk but internal model increasing reward. The
latter approach may require the utilisation of existing internal resources such as
Business Advisors in direct contact with local organisations and Corporate
Communications to target publicity. 
Potential Opportunities 
At a time when businesses are seeking to recover from recent challenges to the
market and economy, there are a range of opportunities emerging that could provide
new and low-cost opportunities for businesses to promote their products and
services to generate impact whilst maximising best value. Potential advertising and
sponsorship opportunities could include: 
Large Format Outdoor – Advertisements installed to the land or property assets 
Small Format Outdoor – Advertisements freestanding or attached to street furniture
or properties 
Public Realm – Parts of the area that are available for everyone to see and use
without charge 24 hours a day, including parks, roads, roundabouts, street furniture
and other assets. 276

Page 277

Appendix 1 
Vehicles – Advertising on the sides and rears of fleet vehicles and other assets 
Event – Sponsoring small and large events to maximise participant and media
exposure. 
Broadcast, publications and electronic platforms – Offer a large and/or targeted
audience. 
All new advertising and sponsorship opportunities considered will be assessed for
legality, deliverability, viability and sustainability through stringent assessment and
appraisal via robust business cases.