NORTH AYRSHIRE COUNCIL 
21 March 2023 
Cabinet 
Title:    Community Asset Transfer of the Toilet Block and adjacent
land at Ardrossan South Beach. 
Purpose:  To provide an update to Cabinet on progress relating to the
Community Asset Transfer of the toilet block and adjacent land
at Ardrossan South Beach; and 
Seek approval for the revised rent for the asset being transferred
to Ardrossan Community Development Trust. 
Recommendation:  That Cabinet: 
a) Notes the ongoing progress of the Community Asset
Transfer assessment process.
b) Agrees a revised rent of £600 per annum (10% of the
current valuation of £6,000 pa). 
1. Executive Summary 
1.1 At a meeting on 24 January 2023, Cabinet agreed in principle to a lease, under the
Community Asset Transfer (CAT) process, of the existing toilet block and adjacent land
at Ardrossan South Beach, South Crescent Road, Ardrossan between Ardrossan
Community Development Trust and North Ayrshire Council. 
1.2 The lease to Ardrossan Community Development Trust (ACDT) would allow the area to
be developed in order to enhance local facilities including the delivery of the Ardrossan
Promenade project funded under the Scottish Government’s Regeneration Capital
Grant Fund (RCGF). 
1.3 There was a requirement to confirm Cabinet’s agreement in principle for the asset
transfer in the January 2023 Cabinet in order to access Lottery funding which has been
previously allocated for Ardrossan. 
1.4 Officers were authorised to progress the CAT assessment process with any outstanding
issues brought back to Cabinet for decision.

Page 2

2. Background 
2.1 Since approval in principle by Cabinet, the CAT process has progressed, with the
following further information being provided: 
• Submission of outstanding paperwork from ACDT
• Satisfactory Locality Officers assessment of the full application where the application
received a Medium score.
• Satisfactory assessment by Legal in relation to ACDT governance documents
• Satisfactory assessment by Finance and Business Team where it received a Medium
score.
• Agreement developed with Streetscene in relation to the ongoing care and
maintenance of the site has been included in the lease.
• Completion of the full statutory public consultation where no comments were
submitted. 
2.2 Since January, there has been substantial negotiation between North Ayrshire Council
and lawyers representing ACDT regarding the lease. Mutually agreeable proposed
amendments have been made through ongoing discussions between all parties. 
2.3  A Business Plan pertaining to the applicant and the asset requested is required as part
of the CAT process and should be submitted with the initial application.  Information
from the business plan is used to ascertain an appropriate level of discount to the
valuation of the asset. 
2.4   In the case of ACDT, the Business Plan was submitted on 2 March 2023. As this was
not available prior to the Cabinet meeting of 24 January 2023, no discount could be
advised at that time. Based on the information now available, it is recommended that a
rent of £600 per annum be applied to this CAT – 10% of the current valuation. This
takes account of the condition of the existing facility, investment to date and the potential
social return on investment. 
The community asset transfer process will not transfer from the Council. Leasing 
under the community asset transfer process permits the Council to exercise its rights
under the Community Empowerment (Scotland) Act 2015 to evaluate its Best Value
duty in terms of social value, rather than monetary best value. Granting a lease in this
way means that the community organisation is not charged commercial rates, as the
Council recognises that the greater opportunity is for the community to benefit from local
community operational management. This CAT will facilitate the development of range
of events and activities within the enhanced area, encouraging a wider range of people
to get involved, giving opportunities for local volunteering and stimulating involvement
in shaping and regenerating community life, building self-esteem and confidence. In
addition, the creation of the beach huts will support local business enterprise, with
profits being used to sustain ACDT’s projects.   
2.5   The Business Plan sets out the opportunities for ACDT to generate income, where
external funding has been secured and where potential funding may be leveraged from.
This includes the income from the travelling fairground, a key feature in the local events
calendar.

Page 3

2.6 The Ardrossan Promenade project is the first phase of works to regenerate Ardrossan
Promenade at South Beach.  This aims to create a vibrant seafront destination to
encourage increased visitors, visitor dwell time and spend in the town. through the
creation of: 
• A community hub including café by repurposing the toilet block; 
• Accessible toilet facilities including a Changing Places standard facility;
• A dynamic and inclusive destination play area for community and visitor use;
• Bike parking, bike maintenance and e-bike charging facilities; and
• Beach huts for use for community and commercial activities. 
2.7 Cabinet approved the submission of an application to the Scottish Government’s
Regeneration Capital Grant Fund (RCGF) for the project in June 2021.  A funding
package of £1.008m has now been secured including £249,584 from the Big Lottery
Fund and £748,000 from RCGF.  This is matched with £10,416 from the Council
towards active travel infrastructure. The award under RCGF requires the funding to be
financially committed by 31 March 2023.  The conclusion of the CAT process will allow
the tenders to be awarded for the project and the required financial commitment. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the ongoing progress of the Community Asset Transfer assessment
process.
b) Agrees a revised rent of £600 per annum (10% of the current valuation of £6,000
pa). 
4. Implications/Socio-economic Duty 
Financial 
4.1 Through the transfer of the assets, the Council will achieve an income of £600 per
annum. There is loss of income to NAC in relation to the transfer of these assets due to
the loss of the income from the fair ground operator and other ad hoc events. The exact
amount involved is commercially sensitive data. In the longer term, there will be cost-
avoidance in other Council budgets. 
In addition, in partnership with NAC, ACDT have already attracted RCGF funding
totalling £748,000 to fund the hub. Big Lottery funding totalling £249,584 towards the
play area has also been secured. Both funds require to be financially committed in the
current financial year.  Community Investment Funding totalling £ £53,100 has been
agreed and North Ayrshire Council has allocated funds of £10,416 towards active travel
infrastructure. North Ayrshire Council has also committed additional funding totalling
£42,036 to assist in meeting a funding shortfall due to rising costs in the volatile
construction sector. 
Human Resources 
4.2 None.

Page 4

Legal 
4.3 The approval is subject to satisfactory negotiation by Legal Services. 
Equality/Socio-economic 
4.4 There will be considerable socio-economic benefits from the transfers and the sum
proposed reflects the community benefits. These include a variety of positive impacts,
for the community of Ardrossan and the surrounding area. 
Climate Change and Carbon 
4.5 The transfer seeks to provide sustainable community facilities. 
Key Priorities 
4.6 The proposals contained within the original report support the following North Ayrshire
Council Plan priorities: 
• Active and strong communities 
• Inclusive, growing and enterprising local economy 
• People enjoy good life-long health and wellbeing. 
• Vibrant, welcoming and attractive places 
Community Wealth Building 
4.7 This proposal supports the following pillars of community wealth building: 
• Advancing community enterprises; 
• Advancing local ownership of underused land and buildings; and  
• Supporting local business activities and increasing the variety of ownership models. 
5. Consultation 
5.1 Consultation has taken place with Ardrossan Community Development Trust, local
organisations, Economic Development and Regeneration, Streetscene, Finance,
Estates, Facilities Management, Property Maintenance and Investment, and Legal
Services. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on (01294) 324415. 
Background Papers
Appendix 1 – Business Plan

Page 5

1 
BUSINESS PLAN MARCH 2023 
Company No:  SC634107
Charity No:    SC052209

Page 6

2 
Contents 
1. Executive Summary 
2. Background to Ardrossan Community Development Trust
• 2.1 Formation, Legal Structure and Membership
• 2.2 Track Record and Key Projects 
3. Vision, Mission and Values
• 3.1 Vison
• 3.2 Mission
• 3.3 Values 
4. Ardrossan - Our Community
• 4.1 History and Heritage
• 4.2 Socio Economic Background and Challenges
• 4.3 Community Assets 
5. Community Consultation 
• 5.1 Our Place Initiative
• 5.2 Three Towns Charrette
• 5.3 ACDT Community Workshops: WAVE particle 
• 5.4 Community Survey and Market Research 
6. Current and Future Projects and Opportunities
• 6.1 Current Projects
• 6.2 Future Opportunities 
7. SWOT analysis 
8. ACDT Strategic Objectives and Impacts 
• 8.1 Community
• 8.2 Physical/Environmental
• 8.3 Economic 
9. Key Stakeholders and Partners 
10. Forward Plan 2023/2024 
11. Management and Governance 
• 11.1 Trustees Profile
• 11.2 Staffing Roles and Responsibilities
• 11.3 Future Proposals 
12. Premises and Resources
• 12.1 Frank Sweeney Centre For Enterprise 
• 12.2 South Beach Promenade 
13. Risk Analysis

Page 7

3 
14. Financial Projections 
• 14.1 Capital Project Funding and Finance
• 14.2 Operating Income and Expenditure Summary and Commentary 
Appendices 
• Appendix 1 Trustee Summary Profiles

Page 8

4 
1. EXECUTIVE SUMMARY 
Ardrossan Community Development Trust (ACDT) was formed in 2019  to engage in activities
that benefit and support the community of Ardrossan - increasing opportunities, improving the
physical environment of the town, attracting more visitors and reviving the sense of pride in
the town. Currently we have more than 320 members and operate as a Charitable Company
Limited by Guarantee. ACDT is managed by a board of 10 local people with a range of skillsets
and significant experience within work and community settings.  We have secured office space
within the Frank Sweeney Centre For Enterprise from a key partner, Cunninghame Housing
Association, and funding from North Ayrshire Council to support our Development Officer for
an initial 18-month period. 
Local deprivation levels and the protracted difficulties arising from the decline of our former
shipbuilding and oil industries and tourism decline provide much of the backdrop and
motivation for our work – but so too does the continuing development of the ferry port and
marina, the visitor development potential of the South Beach promenade and the opportunities
offered to redevelop the former oil refinery site at North Shore moving forward. ACDT aims to
play a lead role in developing new projects while supporting our community partners to thrive
and develop as well. 
To guide our work over the foreseeable future we have adopted the following Vision
Statement.    
“Our Vision is to develop projects that contribute to the development of our Town. making the
most of its natural assets and creating an environment which encourages employment  &
volunteer opportunity; supports engagement, involvement, inclusion and general wellbeing;
and continues to improve commercial, community, recreational and visitor facilities which meet
the aspirations of Ardrossan residents.” 
We have identified a number of important changes we would like to help bring about in our
community. These ambitious outcomes will motivate and challenge us, help give focus to our
work and to prioritise the projects and initiatives which we develop. These are set out within
this Plan under Community, Physical / Environmental and Economic themes. 
These have been informed by several community engagement events and surveys over the
past 7 years, identifying which have been prioritised to regenerate the town. These include: 
• Development of the seafront and promenade; 
• Securing better sporting, leisure and play facilities particularly for young people; 
• Creating a town that tourists and visitors want to visit; 
• Enhancing the natural and historical assets of the town; and 
• Levering in funding & investment bringing employment opportunities 
The initial projects which ACDT have prioritised at South Beach are the first phase of works
to regenerate Ardrossan and help to create a vibrant accessible and inclusive destination for
local communities and visitors. This Plan sets out our  proposals for a fully accessible
children’s playpark, cafe and Beach Huts on the Ardrossan South Beach area of the town –
with in excess of £1.3m of capital funding from the National Lottery’s Our Place Programme
and the Scottish Governments Regeneration Capital Grant Fund to put these in place in 2023. 
Further project proposals are set out which ACDT will develop in the years ahead. These
include operation of a Community Benefit Fund for Sorbie Wind Farm; further phases of
Regeneration at South Beach; the Sustrans Ardrossan Connections project; plans to identify

Page 9

5 
and redevelop vacant and derelict properties into community assets; and an Advocacy project
in partnership with other local agencies. 
Finally the Plan sets out 5-year financial projections based on key assumptions on staffing,
premises and overhead cost projections and the anticipated trading, contract and grant
funding income necessary to sustain the organisation over this period. Overall our main
income source over the Plan period will be grant income, which is consistent with ACDT’s aim
and purpose as a charity. Income generation from beach hut, crazy golf, cafe rental and events
income will come on stream following the completion of the installation of all of the facilities at
South Beach. 
Staffing costs will, by some distance, be our largest cost category over the plan period – with
discussions already underway to secure grant funding support for both core and temporary
staff. We aim to continue to create opportunities for unemployed local residents in delivering
both our core services and in managing the facilities we will soon have on site at South Beach.
We have made provision for a lease payment to North Ayrshire Council  for the site at South
Beach, the terms of which are still under negotiation. and have ensured a growing annual
provision for utility bills in the face of the current fuel crisis. Provision has also been made for
repair and maintenance of South Beach premises and equipment following the end of defects
liability and manufacturer warranty periods. 
Based on these assumptions, we are budgeting for small annual surpluses across the Plan
period to provide us with the ability to accumulate appropriate levels of reserves for
contingency and organisational development purposes.

Page 10

6 
2. BACKGROUND TO ARDROSSAN COMMUNITY DEVELOPMENT TRUST 
2.1 Formation, Legal Structure and Membership 
Ardrossan Community Development Trust (ACDT) was formed in 2019 following significant
community consultation within the Town via the Lottery funded Our Place Programme and the
Three Towns Charrette - both of which identified a range of locally agreed development
priorities. The Trust was formed to engage in activities that benefit and support the community
of Ardrossan, increasing opportunities, improving the physical environment of the town,
attracting more visitors and reviving the sense of pride in the town. 
ACDT’s objectives, as stated in the Articles of Association are: 
• The advancement of community development, including the advancement of urban/ rural
regeneration
• The maintenance, regeneration, and improvement of the communities physical, economic,
social and cultural infrastructure.
• The advancement of education, training, arts, culture, heritage, sports, recreation,
environmental improvement, social and economic wellbeing. 
Membership of Ardrossan Community Development Trust is open to: 
• Full members who are aged 16 and over and reside in the KA22 postcode area.
• Junior members who are aged between 12 and 16, with no voting rights.
• Associate members aged 16 years and over who do not reside in a KA22 postcode area,
and to organisations with no voting rights. 
Currently we have 320 adult members and 3 junior members and includes members from
other community organisations within the Town, including Ardrossan Community Association,
Ardrossan Castle Heritage Society, Three Towns Growers, Whitlees Community Centre & 
Ardrossan Community Sports Hub. 
ACDT is managed by a board of 10 people with key links to other community groups and skills
to progress projects for the town. 
Ardrossan Community Development Trust are currently a Charitable Company Limited by
Guarantee (Company No SC634107; Charity No SC052209). 
2.2 Track Record and Key Projects 
Since 2019 Ardrossan Community Development Trust has undertaken a range of activity:  
• Following on from the Lottery funded Our Place Programme and Three Towns Charrette,
ACDT commissioned further community workshop activity through Mike Hyatt Associates
and Wave Particle. Survey work was also completed by IBP Strategy and Research to
identify preferred sites and activities for proposed playpark and other regeneration activity
at the South Beach promenade. 
• ACDT secured £53,100 from the North Ayrshire Council Community Investment Fund
(CIF) to fund recruitment of a Development Officer for an initial 18-month period. The
Development Officer came in to post in June 2022. 
• We have a lease in place with Cunninghame Housing Association for the use of office
space within the Frank Sweeney Centre For Enterprise. This location gives ACDT good
visibility on the main street of the town, enabling the local public and trust members to drop

Page 11

7 
into the office during our opening hours from 9am to 5pm Monday to Friday, to engage
with ACDT Development staff. The Centre also provides ACDT with access to much
needed meeting and training space for our own use and for other community groups at no
charge. 
• We have developed detailed proposals for a fully accessible children’s playpark, cafe and
Beach Huts on the Ardrossan South Beach area of the town and have also generated a
list of other attractions we intend on creating to help bring visitors to the area including the
reinstatement of Crazy Golf to the Promenade. 
• Following development of these proposals we secured £274,542 of capital funding from
the National Lottery’s Our Place Programme and a further £748,000 worth of funding from
the Scottish Governments Regeneration Capital Grant Fund (RCGF) to enable ACDT to
bring our South Beach regeneration projects to fruition. Works are scheduled to
commence  in March 2023. 
• ACDT are key partners alongside North Ayrshire Council and Sustrans in the development
and delivery of the Ardrossan Connections project which looks to improve the National
Cycle Network through the Town, improve active travel  and address key issues in relation
to traffic movement and road landscapes. 
• Over a period of time we have developed a good following on Facebook with 1165 
followers engaging frequently with the page. We also have an informative website with
newsletter sign up and monthly emails sent to keep Trust members and the local
community up to date with our ongoing projects, future proposals and range of activities. 
This Business Plan has been produced to set out the mission and objectives for ACDT going
forward, establishing key issues and priorities identified by the local community, setting out
details of the projects we are bringing forward and highlighting future opportunities. The Plan
highlights the intended community, environmental and economic impacts we will be working
towards and the range of agencies and stakeholders we will be working in partnership. Finally
the plan provides information on our Board and proposed staffing arrangements, identifies
projected capital costs and associated funding for our key current projects at South Beach and
sets out 5 year income and expenditure projections, with detailed assumptions presented as
an Appendix.

Page 12

8 
3. VISION, MISSION AND VALUES  
3.1 Vision  
Ardrossan Community Development Trust have adopted the following Vision Statement.    
“Our Vision is to develop projects that contribute to the development of our Town. making the
most of its natural assets and creating an environment which encourages employment  &
volunteer opportunity; supports engagement, involvement, inclusion and general wellbeing;
and continues to improve commercial, community, recreational and visitor facilities which meet
the aspirations of Ardrossan residents.” 
3.2 Mission 
“Ardrossan Community Development Trust’s mission is to engage and work with local
residents, local businesses, third sector and community organisations and partners to rebuild
and regenerate the town. We will do this by establishing, sustaining and growing projects,
groups, and premises for the benefit of  residents and visitors alike, making Ardrossan a better
place to live, work, volunteer and visit.”  
3.3 Our Values
Our core values are the platform from which we work, outlining what is important to ACDT and
guiding how we operate. These values will be reflected in the priorities, behaviours and
decisions made by our Trustees, staff, and volunteers.
The key values for Ardrossan Community Development Trust are:
• To be open, honest and accountable 
• To be led by our community 
• To create opportunity 
• To be collaborative and to work well in partnership
• To be entrepreneurial
• To be supportive, inclusive, creative and innovative in our approach
• To put emphasis on long term investment and legacy benefits
• To be sustainable
• To work in alignments with local and national policies and strategies including NAC
Community Wealth Building strategy and the Scottish Government’s Community
Empowerment Act.
• To supporting other groups and partners in achieving their goals
• To be accredited as a Real Living Wage employer

Page 13

9 
4. ARDROSSAN – OUR COMMUNITY 
This section provides some background and insight into the development of  the town of
Ardrossan and some of the key socio economic challenges currently being faced by the
community. 
4.1 History and Heritage  
Ardrossan is a coastal town in North Ayrshire, known locally as one the ‘Three Towns’ along
with Saltcoats and Stevenston. It lies on the north side of Irvine Bay between Irvine and Largs.
Its advantageous coastal location gave the town a strategic position as an industrial, transport
and tourism centre since the 19th Century. 
The town grew significantly as a result of the increase in the shipbuilding, fishing and chemical
industries and new transportation connections developed to support the expanding harbour.
A strong community spirit grew as a result and remains to this day. However shipbuilding
declined in the 1950s and the harbour is now home to a busy ferry port with regular services
to the Isle of Arran and Campbeltown and a marina with significant traffic and tourists passing
through. 
Ardrossan also housed foundries and an oil refinery. The Shell Mex oil refinery was operational
from the early 20th Century before its closure in 1986. The last of the buildings located on the
site were demolished in 2003 leaving a significant area of derelict land on the fringe of the
town centre available to be remediated and brought back into use. A number of the shop units
in the town centre now stand empty now, with the Asda superstore which opened in 2007 the
principal retail offering in Ardrossan. 
Finally, Ardrossan was also a popular holiday destination for Scots in the early 20th Century
before the advent of cheap air travel and foreign holidays hastened its decline like other
seaside resorts. The long beaches on either side of the Harbour remain important sources of
leisure and recreation for locals and a draw for visitors to the area. 
4.2 Socio Economic Background and Challenges 
North Ayrshire is the fifth most deprived Council area in Scotland based on the Scottish Index
of Multiple Deprivation (SIMD 2020). Of the 186 data zones in the 2020 index for North
Ayrshire, 52 are in the 15% most deprived in Scotland, a slight increase of 1 since the index
was previously published in 2016. 
Within North Ayrshire the Three Towns locality, which contains Ardrossan and has a
population of around 32500, has a relatively stable population and good examples of
community cohesion and regeneration. Nonetheless the Three Towns are significantly
affected by poverty and inequality: 
• The Three Towns locality’s claimant count (estimate of people claiming unemployment
related benefits) for September 2021 was 8.1%, up from its pre-Covid-19 (February 2020)
rate of 7.3%. 
• Median gross household income in the Three Towns (£21,749) is the lowest in North
Ayrshire (£24,090) and only 73% of the median Scottish figure (£29,786). 
• 39% of the Three Towns’ population live in areas falling in the top 15% most deprived in
Scotland compared to 27.6% across North Ayrshire

Page 14

10 
Ardrossan has a population of 10,536 according to Scottish Index of Multiple Deprivation 2020
statistics – accounting for around a third of the wider Three Towns population. 
When we drill down into demographic data at the localised Ardrossan level, the prevalence
and intractability of a number of key challenges become very apparent. Out of 13 data zones
in Ardrossan 4 rank within the worst 10% areas of deprivation in Scotland and 7 of the 13 rank
within worst 20% areas. As a result around 55% of the Ardrossan Population live in areas
officially recognised as experiencing multiple deprivation. 
This deprivation comes in many forms: 
• 5 of Ardrossan’s 13 data zones are in the worst 10% in Scotland in terms of income
deprivation – containing 38% of the local population. 
• Ardrossan remains an unemployment blackspot. The neighbourhood of Ardrossan Central
ranks the highest for both adult (9%) and youth (11%) unemployment in North Ayrshire. 7
of Ardrossan’s 13 data zones are in the worst 20% for employment deprivation in Scotland.
• 5 of 13 data zones are in the worst 10% for health deprivation in Scotland – with Ardrossan
Central having the lowest male life expectancy in North Ayrshire (68.2 years versus 75.3
years average) and the third lowest female life expectancy (75.2 years versus 80.1 years
average)
• These health inequalities are reflected in well above average numbers of hospital stays
due to alcohol and drug misuse per head of population, with 4 data zones exhibiting figures
which are at least double the national average.
• 70% of the population of Ardrossan live in data zones where the number of people with no
qualifications is above the national average 
The social and economic challenges faced by Ardrossan and the wider Three Towns have
been further exacerbated by the recent impact of Covid-19, particularly on health, income and
employment.  For example, travel restrictions and reduced ferry travel to Arran and
Campbeltown resulted in reduced visits to the town - impacting on the financial viability of a
range of local businesses reliant on ferry traffic and therefore local incomes and employment
opportunities.   
These are the key challenges which provide the backdrop and motivation for the work of
Ardrossan Community Development Trust and its partners in promoting the regeneration of
the area. The regeneration work being undertaken already by ACDT at South Beach aims to
contribute to the town’s recovery and addressing these challenges by building on the close
working relationships between ACDT, local organisations and NAC Services to tackle the
challenges faced.  In particular the South Beach project will assist in addressing a number of
important local challenges by: 
• Supporting local people into work through the delivery of employability programmes,
training and volunteering opportunities;
• Creating opportunities for local business and employment through the café and beach huts
element of the project; 
• Improving opportunities for social enterprise through the delivery of the project;
• Increasing visitor numbers and spend 
• Improving health and well-being by promoting opportunities for physical activity and active
travel via the improved infrastructure and facilities at the Promenade; and
• Increasing civic and community pride by creating opportunities to volunteer, engage with
and inform the project and fostering a sense of ownership of the coastal environment

Page 15

11 
4.3 Key Community Assets 
In recent years a lot of development work has taken place within Ardrossan by a number of
organisations. As a result, there are now a range of community assets providing a platform to
build on for the regeneration of the town. These assets are reflected in the map and table
below. (There is a community group page on the ACDT website listing more organisations
which exist in our town https://www.ardrossantrust.org/community-group-map/ ). 
The table below directly corresponds to the numbered locations featured on the map above,
giving the name and a description of each local community asset.

Page 16

12 
Community Asset Description
1. Cunninghame
Housing
Association
One of Ayrshires leading social landlords with nearly 3,300
properties in North and East Ayrshire and Dumfries and Galloway.
The Association is headquartered in the town in modern premises
at Ardrossan marina. In addition to housing management and
development, CHA is very active in a range of community
regeneration activities including the development and operation of
three enterprise centres in the town and is committed to providing
support to ACDT and other local community-based organisations. 
2. Ardrossan
Library
A local authority run library providing computers, public meetings,
reading materials and hire. Resources for public learning.
3. Michael Lynch
Centre
The Michael Lynch Centre for Enterprise is an 8600 sq. ft facility
located in Princes Street, Ardrossan developed by CHA to provide
local business space for SME’s and social enterprises. The Centre
contains 18 offices and 2 training rooms over 2 floors and hosts a
number of important local social enterprises including: 
• Community Housung Advocacy Project.
• Ayrshire Independent Living Network .
• Royal Association for Mental Health.
• Triple Act Theatre and Arts 
4. Frank Sweeney
Centre for
Enterprise
The Frank Sweeney Centre for Enterprise is a 10,800 sq. ft. facility
located in Glasgow Street, Ardrossan. Managed by CHA, the
Centre contains 23 quality offices and training rooms, over 2 floors
providing office, training and meeting space for a number of
important local social enterprises and training agencies including:  
• North Ayrshire Council Employability Hub.
• Lennox Partnership.
• Citrus Energy.
• Penumbra.
• Skills Development Scotland.
• 3TFM.
• Ardrossan Community Development Trust (ACDT) 
ACDT currently have office space here where our Development
Officer and staff operate from and engage with the community. 
5. Ardrossan Castle Ardrossan Castle is a distinctive feature of the town and a local
visitor attraction based upon a hill overlooking the heart of the
town. Built around 1140, the land is now maintained by the local
authority. The Ardrossan Castle Heritage Society are developing
proposals to improve and preserve the site to maximise visitors.
They are also researching and sharing knowledge about the castle
with locals and visitors. 
6. Ardrossan Civic
Centre
This facility operated by North Ayrshire Council. provides various
hall spaces from 20 - 200 people capacity and host gym classes,
public meetings, events, parties and other community activities on
a regular basis.

Page 17

13 
7. Ardrossan
Winton Rovers
FC
Ardrossan Winton Rovers Football Club established in 1900, play
out of Winton Park located within the heart of the town. Ardrossan
Winton Rovers are a Community Interest Company with Season
Ticket holders as Members. The club also has a thriving and
successful Youth Academy with 300+ local youths currently
playing within 17 teams. 
Proposals are being developed to assemble capital funding to
install a 3G Astroturf pitch at Winton Park, enabling much more
intensive community use and promoting public participation in
sport. 
8. Ardrossan
Bowling Club
Instituted in 1842, Ardrossan Bowling Club is located a few
hundred yards from Ardrossan's South Beach. With 2 well
maintained greens, the main objective of the club is to provide
facilities for the local community to participate in the sport of bowls. 
Out with bowling, the club has a large main hall which provides a
warm, comfortable and safe environment for members and the
local community to socialise. Guests and non-members are
welcome to hire the hall for private functions. 
9. Ardrossan South
Beach 
Ardrossan South Beach is an important local site for leisure and
recreation used by local residents and visitors alike. South Beach
promenade is an area which ACDT are in the process of
developing after numerous public consultations. This will include a
coffee shop, events, disabled wheelers, playpark, beach huts for
public rental and deck chair hire. 
10. Ardrossan
Academical
Rugby Club 
Ardrossan Rugby Club have pitches and a clubhouse on their site
at Sorbie Road. The Club have a full time Development Officer
employed to develop the sport and opportunities within the town.
The club have men’s teams and youth teams competing in local
and regional leagues. The clubhouse is available for hire to locals
for events and meetings.  
11. James Moffat
Centre
The James Moffat Centre for Enterprise provides 5600 sqft of
childcare facilities in Glasgow Street, Ardrossan. Owned by CHA,
the facility currently houses Busy Bees Nursery who provide
childcare services for children aged 6 weeks to 5 years old. Over
3 floors the building offers good quality space within a convenient
location and with good access to public transport and on street
parking. 
12. Three Towns
Growers 
Three Towns Growers is an allotment and community garden site
situated in Elm Park, Ardrossan. There are 50 plots, 32 outdoor
raised beds and 18 raised beds in the community polytunnel on
site, as well as a pond and bat boxes. 
TTG are dedicated to providing growing space and educational
opportunities to all members of the community. TTG pride
themselves in helping members to live healthier, more sustainable
lifestyles through gardening and social interaction.

Page 18

14 
13. Whitlees
Community
Centre
Ardrossan Whitlees Community Centre is a thriving establishment
in the middle of Ardrossan and welcomes everyone to use the
facilities available. The Centre has a large hall, 2 small rooms,
lunge area and ca café open from 9.00 to 13.00 Mon to Sat. The
Centre organises and hosts a range of social events, fundraisers,
clubs and classes for the people of the community to participate in. 
14. Ardrossan Youth
Club
The Ardrossan Youth Centre is a purpose-built centre in Stanley
Road Ardrossan managed by the Ardrossan Youth Association
(AYA). 
15.  Ardrossan
Community
Sports Hub 
Ardrossan Community Sports Hub are a company limited by
guarantee with charitable status. They have premises on Glasgow
Street and operate a 7000 sqft Community Gym with over 300 local
members in Eglinton Road. ACSH use physical activity and sport
as a means of improving individual health, both physical and
mental, and creating a sense of wellbeing and resilience in the
community – working in partnership with many local organisations. 
16. Ardrossan
Indoor Bowling
Club
Ardrossan Indoor Bowling Club sits at the heart of the town in
Glasgow Street and is co-located on the Civic Centre site. It has
many members with a thriving social club element  which can hold
comfortably 150 people. 
17. Ardrossan Scout
Group
ASG are a grass roots, volunteer led, organisation who have
resided at their premises at Kilmeny Terrace in Ardrossan since
1967. ASG has played an important role in the growth and
development of young people from in and around Ardrossan. Their
Beaver, Cub and Scout sections are at work each week giving
young people opportunities through activity and adventure.
18. North Ayrshire
Foodbank
North Ayrshire Foodbank is a project of the Ardrossan Church of
the Nazarene based at the Nazarene church in Glasgow Street.
The foodbank is part of the Trussell Trust network of 428
foodbanks, working to tackle food poverty and hunger across the
UK. North Ayrshire Foodbank provide three days’ nutritionally
balanced emergency food and support to local people who referred
to them in crisis. 
Summary 
Many years after the decline of its former shipbuilding and oil industries and the movement
towards foreign holiday travel, Ardrossan continues to face a number of challenges outlined
by many of the socio economic indicators referenced above . However the continuing
development of the ferry port and marina, the visitor development potential of the South Beach
promenade and the opportunities offered to redevelop the former oil refinery site at North
Shore provide grounds forward optimism moving forward. 
So too do the raft of community organisations and facilities which have emerged in recent
years, reflecting our communities commitment and capability to create places and services
which support and provide opportunities for local residents. ACDT aim to continue to play a
lead role in developing new projects while supporting our community partners to thrive and
develop as well.

Page 19

15 
5. COMMUNITY CONSULTATION
ACDT was formed back in 2019 following a series of community consultations which, taken
together, played a key role in identifying a range of important local issues and priorities which
ACDT are now working with partners to address. These consultations and the issues which
emerged from each of them are set out in turn below. 
5.1 Our Place Initiative 
Back in 2013 the Big Lottery identified 7 deprived communities within Scotland with a lack of
community capacity and a limited track record in securing Lottery and other funding for
community-led activities. Ardrossan North East and Central was one of these areas. The initial
Our Place work involved a series of community engagement activities, including listening
surveys conducted by Community Renewal, the Our Place development agency appointed by
the Lottery.  A number of development ideas were generated during these events: 
•  Better play facilities in the town 
•  Events around arts, music, culture, and history 
•  Upgrade the main streets and tidy up local area 
•  More shops and amenities 
•  Activities and social space for young people 
•  Develop seafront and waste ground 
•  Opportunities for older generations 
•  Ardrossan to be a town that tourists come to visit 
•  More funding & investment bringing employment opportunities 
•  Sport and leisure facilities 
These ideas provided the focus for Lottery funding for themed activities over a 5-year period
from 2014 to 2019 which supported the community having more influence on decisions taken
locally, having more sustainable services and facilities that reflected local priorities, and people
feeling that their community was a better place to live. 
A number of important local projects and facilities developed from the Our Place programme
including, for example,:
• The Three Towns’ Growers who secured funding to create their community allotment
facility 
• The Ardrossan Community Association who received funding to refurbish the Whitlees
Community Centre 
• Ardrossan Castle Heritage Society who received funding to help stage a Castle carnival
recreating medieval scenes on the castle grounds, bringing the community together to
celebrate its heritage,
5.2 Three Towns Charrette 
A Charette was undertaken across the Three Towns in June 2017. Funded by North Ayrshire
Council and the Scottish Government, the exercise involved the use of the Place Standard to
help inform the emerging Three Towns Locality Plan. 
The decision by the Scottish Government to retain Ardrossan as the ferry terminal for the Arran
service, prior to the charrette, helped stimulate thinking around how to capture the economic
benefit of the flow of through-traffic and place-based improvements (e.g. creation of civic
space) to facilitate this, whilst the development of the Ayrshire Growth Deal bid included

Page 20

16 
proposals for the development of the Ardrossan North Shore site for both residential units and
a community campus incorporating a replacement for Ardrossan Academy 
The key points which emerged included the need to: 
• To protect the natural assets of each town. 
• To take advantage of local history as a tourism asset. 
• To join up provision of facilities along the seafront, such as public toilets, play space,
refreshments, changing space, beach huts. 
• Encourage local enterprise along the seafront to attract visitors. 
• Make use of the sea for sporting activities; and 
• Give visitors a reason to visit the towns and motivate local people to use their town centres. 
It identified a range of projects which subsequently helped inform ACDT’s proposal for
Ardrossan South Beach including: 
Centres and Hubs 
•  Pop up spaces for social enterprises and start-ups 
•  Spaces for artists and creatives 
Shoreline 
•  New Facilities 
•  Active Shoreline 
•  Accessibility 
•  Shelters 
•  Cycle facilities 
Greenspace 
• Better maintenance of open space 
Promotion 
•  Developing year-round events and activity programmes 
•  Signage and promotion of site-specific features 
5.3 ACDT Community Workshops: WAVE particle 
Following on from Our Place and the Three Towns Charrette, ACDT engaged in further
consultations with the local community in February 2020 to help develop detailed proposals
for an inclusive play park in the town – to be funded by Our Place Lottery funding. 
ACDT commissioned WAVE particle to hold two workshops in early 2020 which considered 4
green spaces within the town as potential sites for the development of a playpark. South Beach
was the preferred location for the with local people identifying a number of key issues
including:  
• Importance of creating a facility for both locals and visitors. 
• Desire to create a destination Ardrossan residents would use for a day out. 
• Desire to create an inclusive and accessible facility with an open space approach. 
• Significant attraction of seaside and island views and local heritage. 
• Desire for a safe, social outdoor space particularly for isolated groups in the community. 
• Desire for specific facilities, including toilets and cafes. 
• Recognition of the potential for the former toilets to be regenerated. 
• Importance of lighting and signage;

Page 21

17 
• Aspiration for the facility to be unique to Ardrossan and grounded in the town’s heritage. 
5.4 Community Survey and Market Research 
By summer 2021 ACDT had secured Our Place Lottery funding to develop the inclusive play
park and had developed more detailed proposals for other regeneration activities on South
Beach promenade. The notion of the beach and its Promenade as a significant asset for the
town, both for the local community and in attracting people into the town, has consistently
emerged across all community engagement activity.   
To help inform the community about the South Beach proposals, obtain feedback to refine
them and to help support a submission to the Scottish Government for Regeneration Capital
Grant funding, ACDT commissioned IBP Strategy and Research to undertake a large face to
face survey - generating almost 450 responses from local residents, visitors and businesses.  
This survey and consultation work concluded: 
• Over half of survey respondents overall indicated that they visit South Beach promenade
but the great majority of visitors from out with the KA postcodes (89%) said they visit only
occasionally or less often. At present, use of the Promenade was most commonly for the
“informal” activities of general relaxation, walking and dog walking . 
• The average estimated time spent on a visit to the Promenade is 1.49 hours though this
is higher (2.23 hours) amongst visitors from outside the KA postcode areas. Average
spend in the shops and eating / drinking places of Ardrossan on a typical visit to the
Promenade is estimated at £14.05 - relatively low for a typical “day out”. 
• Respondents were asked whether various strands of the proposals developed by ACDT
would be good for Ardrossan with responses summarised in the table below. A significant
majority considered that each of these elements would be “good for Ardrossan”, ranging
from 73% for a new and extended play park to 97% for a community-run café and,
especially, 98% for fully accessible toilets. Families with children were particularly positive
about the new and extended play park and about the “crazy golf” type facility, and younger
groups were more enthusiastic than others about the retailer beach huts.

Page 22

18 
• 60% of visitors to the Promenade indicated that a development such as this would make
them visit more often – with 60% indicating it would encourage them to stay longer at the
Promenade when they do visit. 
• Respondents were asked about the potential impacts which the South Beach development
would have on the local community and Ardrossan generally. The results are set out in the
table below. A high proportion believe the project would have a positive effect on the local
economy generally (92%), encourage others to invest in the town (92%) and increase the
number of people that visit Ardrossan for leisure purposes (91%). 
Conclusion 
As outlined above, over the past 7 years, Ardrossan residents have actively participated in a
range of community engagement events and surveys to establish the issues which they feel
should be prioritised to regenerate the town.

Page 23

19 
A number of consistent themes emerged which have provided real focus for the work of ACDT
and other partners to date in developing new project proposals to date and in the years ahead.
These include: 
• Development of the seafront and promenade; 
• Securing better sporting, leisure and play facilities particularly for young people; 
• Creating a town that tourists and visitors want to visit; 
• Enhancing the natural and historical assets of the town; and 
• Levering in funding & investment bringing employment opportunities

Page 24

20 
6. CURRENT AND FUTURE PROJECTS AND OPPORTUNITIES 
Since inception ACDT has been active consulting with the community to develop important
new projects for the town. Fortunately, we have had a great response from funders and we
are now on the verge of completing projects which will create important new facilities for the
Town. Further details on these are provided below. 
Moving forward we have proposals in mind for further phases of our work at South Beach,
whilst the work we have been doing with Sustran’s on an active travel network and the
proposals for us to manage the distribution of Community Benefit Funds on behalf of a local
Wind Farm, will come to fruition in the near future. Details of these are also provided below
together with an insight into other potential opportunities on the horizon. 
6.1 Current Projects 
The 2 projects which ACDT have been working to bring to fruition at South Beach are part of
a wider programme of regeneration across Ardrossan being delivered by ACDT and NAC.
These projects are the first phase of works to regenerate Ardrossan Promenade at South
Beach to create a vibrant accessible and inclusive destination for local communities, wider
North Ayrshire population and visitors. 
We aim to make South Beach a place for all the community to meet and to relax. The
development will be unique to Ardrossan and aims to celebrate the people and history of the
town. We will create an attraction for the large volume of visitors passing through the ferry port
every day, so that they stop and add more to the local economy. The uniqueness will come
from design input from the community and an art/landscape-based approach. 
South Beach Promenade (Phase 1) - Inclusive Playpark Facilities 
Using Our Place funding secured from the National Lottery,  ACDT plan to install a new play
park which will be connected to the existing playpark. Work on the new facility is scheduled to
commence in Spring 2023 and to be completed within 3 months. The new playpark will have
accessible basket swings; a swing for wheelchair users; inclusive wheelchair roundabout;
inclusive trampoline; a boat swing; and safety surfacing – all together providing the people of
Ardrossan with a dynamic and inclusive play facility. The swing park will be surrounded with
additional landscaping which will include new trees and hedging.
A traditional hedged maze will also be installed, connected via a footpath to the main park with
some play park equipment at its core.
We will also bring back to life the redundant crazy golf course. The bespoke 18-hole course
will be brightly coloured with each hole having its own flagpole at a 2.4 metre height making
the course easily visible from the surrounding area. The crazy golf will provide opportunities
for competitive fun between all generations and be a great asset in attracting locals and visitors
alike to the prom to enjoy simple easy activity and interaction. 
The aims of this project, agreed with the National Lottery, are: 
• To reduce inactive or sedentary lifestyles in children by increasing participation in play
and healthy leisure activities - by providing free access to new play facilities and also
involving Ardrossan Community Sports Hub to deliver free fitness activities within this
area.

Page 25

21 
• To improve social development in children by creating new opportunities in a fully
inclusive space for all ages & abilities; to enjoy and learn through play and meet and
engage with other children and the wider community 
• To redevelop and revitalise a tired beachfront, creating a new outdoor space to
increase community engagement with their Town and its facilities and encouraging
visitors to stop and spend within the local community 
South Beach Promenade (Phase 1) – Regeneration Project 
ACDT have already been able to install new facilities on South Beach. 
Deckchair Project – A successful Coastal Waters funding application allowed ACDT to
commission 100 deckchairs for promenade users which are free to hire. Each deckchair is
bespoke with the canvas specially created with colour, pattern, image, and/or text that is
specifically relevant to Ardrossan. 
The deckchair project was used as an engagement tool, whereby the schools and the local
community were invited to participate in a series of workshops to generate the words, phrases,
images and overall colour for the chairs. These workshops focused on learning more about
our waters and coasts and how to look after them. 
Wheelers & Hippocamp project – ACDT provide free use of disability chairs called Wheelers
and Hippocamp chairs to enable disabled residents and visitors to have access to the sand
and water at South Beach. This is a very exciting inclusive project which means that everyone
can have access to the beach along the promenade 
The project will be serviced from the rear of the planned Community Hub and is planned to be
open all year round. We see this is the start of an inclusion for all project that will see more
families access Ardrossan South Beach for a day out or a stroll along the beach. 
ACDT have also secured funding from the Scottish Government RCGF programme to enable
the development of a number of elements of our proposed programme of works at South
Beach to commence in March 2023. This includes: 
• Creation of a new Community Hub including café by repurposing the site of what is
currently a semi derelict toilet block. This will be operated as a community venture via
a lease to another local community organisation. 
• This will build upon the existing beach wheelers and deckchair project which ACDT
already have in place on the promenade and provide accessible toilet facilities
including a Changing Places standard facility for café, community and visitor use. 
• Beach huts for hire for commercial activities by local businesses, traders or community
organisations. These will provide accessible facilities on the Promenade to encourage
longer visitor dwell time and generate trading income from ACDT. 
• Bike parking, bike maintenance and e-bike charging facilities to support active travel
to and from the Promenade, through the towns and along the National Cycle Network
routes. 
The creation of the playpark, Community Hub, beach huts and the other facilities identified
above will necessitate ACDT entering into a long lease (25 years) with North Ayrshire Council

Page 26

22 
for the relevant area of South Beach required to locate the development. This is currently
under negotiation and is expected to be concluded in early 2023. 
The facilities will encourage the local community to connect with the promenade and support
the regeneration of Ardrossan by: 
• Creating a vibrant, welcoming, inclusive sustainable and attractive seafront destination
attracting tourism investment and visitors all year round.
• Bringing the existing vacant toilet block back into sustainable positive use.
• Creating a sustainable community café model which facilitates community interaction,
reduces social isolation, and supports social enterprise.
• Improving local quality of life through increased opportunities for physical activity,
volunteering, and employment.
• Addressing the deficit in facilities at South Beach towards achieving Blue Flag status. 
• Supporting physical activity and sustainable travel on the Promenade and between the
towns; and 
• Creating opportunities for volunteering, social enterprise, business and employment
including pop up shops via beach hut facilities. 
Ardrossan Connections 
Ardrossan Connections is being delivered by Sustran’s Scotland (a charity whose aim is to
make it easier for people to walk, cycle and wheel) in partnership with North Ayrshire Council,
The National Transport Agency for Scotland and Ardrossan Community Development Trust.
The project partners take part in a Delivery Group with ACDT’s involvement being important
in ensuring the long term direction of the project represents the communities’ priorities and
aspirations. 
The aims of the project are to 
• Provide safe, accessible and attractive walking, wheeling and cycling route for residents
and visitors and improve the attractiveness of the National Cycle Network Route 73 and
753 between the Three Towns.
• Create a sense of place in the centre of Ardrossan that celebrates local heritage and
encourages more inbound visits to the town centre.
• Improve awareness of National Cycle Network and benefits of active and sustainable
travel.
• Reduce transport poverty and allow more people to experience the health and wellbeing
benefits of travelling actively and sustainably.
• Empower the local community to influence decisions affecting their daily lives and their
local environment 
6.2 Future Opportunities 
Whilst the procurement and physical work on the construction of the new facilities at South
Beach and their subsequent operation will be a key focus in late 2022 and all of 2023, ACDT
Board and staff members continue to work on several other projects will we hope to bring to
fruition in the next few years. 
Sorbie Windfarm Community Benefit 
ACDT have also entered into a Memorandum of Understanding in relation to managing a
Community Benefit Fund on behalf of Energy farm UK Sorbie LLP UK in relation to the Sorbie

Page 27

23 
Wind Farm which is proposed to be sited approximately 2km north of Ardrossan.  Current
proposals are for a 3 Turbine Wind Farm which would generate c12 Mega Watts of wind
power. 
The developer proposes offering a Community Benefit Fund to the community based upon
and annual payment of £5000 per MW of generation capacity installed on the Sorbie Wind
Farm. This sum will be guaranteed for the lifetime of the development, which is intended to be
twenty five years from the date of commissioning, and the payment would be distributed evenly
between the Three Towns communities. 
ACDT therefore anticipates receiving an annual payment for distribution based on £1,666.67
per MW of generation capacity installed on the Sorbie Wind Farm – potentially around £20,000
per annum. (Although the annual fund total will be dependent on the final installed capacity of
the Sorbie Wind Farm). 
The Trust will agree a funding criteria, a panel for decision making and ensure accurate
records are retained in relation to the same allowing access to small local grant funds for
individuals and organisations within the Town.   
South Beach Promenade – Future Phases 
ACDT have secured planning permission from North Ayrshire Council to develop further
phases of our South Beach proposal - although funding for this work has still to be secured.
Our plans include: 
• Mini Castles on Mounds  - mini castles cast from sandcastles made by the local
community located on grass mounds 
• Washed Up on the Beach – play installations involving boulder stepping stones and
seats, shipwreck timber, sand diggers/waterspouts, balancing logs and willow dens 
• Climbing Boulders - Artificial boulders designed for climbing of all ages/rock works arch
boulder and rock works mini boulder supplied by sutcliffe play. 
• Wavefield – low linear  mounds for informal play rolling and climbing 
• Ship Wind Vanes - Wind vanes designed by the local community representing the ship
building history of Ardrossan/ along the path edge an informal palm tree avenue. 
• Theatre Stage – A stage to allow concerts, theatre, a place to show movies and
emerging talent in all areas of art. 
• E-bikes / Charging – We will provide charging points for vehicles and bikes and provide
Sheffield stands for bikes. 
Safer Shores Project 
Connecting with other community groups, ACDT have joined forces with Voice of Ardeer
(Stevenston) & S.A.L.T. (Saltcoats) to create a 3-pronged approach to promote community
safety along the 3 towns shoreline.

Page 28

24 
The project involves the placing of CCTV cameras along the South Beach Promenade,
Saltcoats Promenade and the Ardeer shoreline to aid public safety and to protect the
community assets currently in place and those planned. The 3 groups are working collectively
to fund the CCTV co-produced project Safer Shores. 
Derelict Land and Buildings 
We are aware that every town centre faces the challenges of an evolving retail pattern, and
we will work to make sure that our town centre becomes as vibrant and thriving as much as
possible. We want to have a town centre that is diverse and sustainable and where our
community and visitors can live, work, and enjoy. We can only do this through sustainable
regeneration, achieved with  collaboration and investment. 
The Trust plan on looking at derelict properties and land within Ardrossan,  and, where
possible, bring into community ownership and develop plans to regenerate them into new
community spaces,  and valuable community assets. 
Advocacy Project 
ACDT are in the process of setting up a partnership project with Ardrossan Community Sports
Hub (ACSH) and the Community Housing Advocacy Project (CHAP) to provide the local
community with an advocacy worker who will give advice on housing, benefits, money, and
welfare matters. This will be vital support to the community during the cost-of-living crisis,
particularly as we live in an area of multiple deprivation. The project partnership have been
successful in seeking CIF funding and are advertising at present for an Advocacy Officer.

Page 29

25 
7. SWOT ANALYSIS 
In order to summarise the key factors influencing the environment which ACDT currently will
operate within, and pulling together all of the information set out in the Plan to date, a SWOT
analysis has been created. This is set out below 
Strengths Weaknesses
• Good premises secured in the town
centre
• Support from North Ayrshire Council
• Experienced, committed & pro - active
trustees
• Strong Membership base - over 320 local
residents
• Extensive Community Consultation to
inform ACDT priorities
• Excellent relationship with CHA
• Good website and social media exposure
• Significant turn outs at events and high
level of community interest in projects run
by ACDT
• Successfully secured Lottery and Scottish
Government Capital Grant Funding for
South Beach Project
• Recruitment of Development Officer 
• Good use of employability Programmes to
support core staff
• Very good relationships with local
community-based organisations
• Providing a unique opportunity for
wheelchair users to get on the beach 
• Lack of local infrastructure to support
community leisure and recreation
facilities
• High levels of deprivation locally in
Ardrossan presents key challenge to be
addressed
• Time limited funding for current staff
• Ongoing training and investment
required to ensure staff development
• Requirement for ongoing grant funding
support over the next 5 years to sustain
current business model 
Opportunities  Threats
• Chance to enhance local sense of civic
pride and identity 
• Develop infrastructure to stimulate growth
in local economy
• Improve local mental health and social
isolation
• South Beach Promenade is a visible
location helping to raise profile of ACDT
• Creation of jobs for local people 
• Opportunity for coffee shop to be
outsourced to local operators
• Ability to put on exciting events for locals 
• Increase income generation to increase
ACDT sustainability and core staff costs 
• Beach Huts would provide hire income
potential 
• Charitable status will provide benefits in
terms of  accessing more funding streams 
• Very competitive capital and revenue
funding climate 
• Expertise required to operate as a SCIO
that can obtain funding successfully 
• Need to continue and develop the
strength of the ACDT board of Trustees
• Need to complete negotiations with NAC
on South Beach Lease
• Reliant on agreement with NAC for
maintenance of facilities on South
Beach in current austerity climate
• Need to ensure availability of town
centre premises beyond current lease
with CHA

Page 30

26 
8. ACDT STRATEGIC OBJECTIVES AND IMPACTS 
Based on the Vision and Mission we set out earlier in this Plan, we have identified a number
of important changes we would like to help bring about in our community. These describe
positive differences and impacts we want to work towards with the community and our key
partners and will provide a focus for our activities over the duration of this Plan. 
These ambitious outcomes will motivate and challenge us, help give focus to our work and to
prioritise the projects and initiatives which we develop. 
These are set out below under Community, Physical / Environmental and Economic themes. 
8.1 Community 
Help empower the Ardrossan community to have a positive identity and strong voice in local
decisions to maximise community well-being and resilience: 
• Continue to develop as a key community anchor organisation offering effective support
to community based groups to secure funding and resources to sustain important
services 
• Provide effective means for the Ardrossan community to be involved in designing and
delivering the services that affect them and which meet their needs and aspirations 
• Work collaboratively with partner organisations across the community to ensure strong
and effective community networks are in place 
• Help promote and celebrate community achievements and events to promote
confidence and a sense of civic pride 
• Work to support the aims of community wealth building and asset development to
ensure the community can play a lead role in community regeneration 
• Ensure opportunities for involvement in ACDT’s activities from the widest spectrum of
local people to ensure diversity and inclusion are at the heart of ACDT’s approach 
• Work with partner organisations to promote initiatives to tackle poverty and inequality
and developing community resilience and well being 
• Help improve local residents and visitors awareness and understanding of climate
change, sustainability, and the natural environment through ACDT programmes and
projects 
8.2 Physical / Environmental 
Promote physical and environmental regeneration projects which promote transformational
change for Ardrossan: 
• Improve the appearance and attractiveness of the community, promoting Ardrossan
as a place where people want to live, work, volunteer, socialise and invest 
• Help create new spaces for community, enterprise, learning and retail activities within
the town, easily accessible by public transport and on foot.

Page 31

27 
• Bring redundant/ derelict land, buildings or facilities back into productive community
use where this is feasible and viable. 
• Assist in the development of new community assets and facilities which can act as a
focal point for services which benefit the community and its residents. 
• Capitalise on Ardrossan’s location, natural environment, coastline and heritage as a
basis for developing new spaces, events and initiatives which help develop local
identity and civic pride. 
• Ensure physical regeneration projects are developed in line with best practice
guidelines promoting efforts to move towards Net Zero in terms of carbon emissions. 
8.3 Economic 
Contribute to the regeneration of the town and deliver economic benefit for all sections of the
community: 
• Source and lever in capital and revenue funding to create and sustain projects and
services which provide benefits to the community from this investment. 
• Develop initiatives and facilities which attract visitors, residents, businesses and
enterprising activity to Ardrossan, increasing footfall and spend in the town. 
• Work in partnership with local business and other key stakeholders to help diversify
the local economy and extend the range of employment, retail and leisure and 
recreation opportunities available to local people 
• Help create and sustain jobs and training opportunities for local residents through
ACDT and partner activities and projects 
• Support the creation of a range of volunteering and learning opportunities for local
residents, increasing local employment potential. 
• Further develop ACDT’s role as a social enterprise and provide advice, guidance and
developmental support where required to other local organisations 
• Support the development of transport and digital connectivity for local residents,
improving access to employment, education and cultural opportunities.

Page 32

28 
9. KEY STAKEHOLDERS AND PARTNERS  
Since our formation in 2019 we have been able to develop a range of productive partnerships
with key stakeholders and partners. The support and assistance secured, and some of the
potential opportunities for future partnership working, are set out in the table below.  
Partner Current / Future Partnership Activity  
North Ayrshire
Council
• Ongoing support from NAC Connected Communities Staff to
support ACDT to develop and grow as an organisation and to
develop key projects
• Funding support for market research and social return on
investment survey work to support RCGF funding bids for
South Beach Promenade project
• Strategic partner and match funder (£10,000) for South Beach
Promenade Regeneration Project
• Assistance to secure funding from Kickstart programme to
support ACDT temporary employees 
• Contribution of £53100 funding towards salary costs of
ACDT’s Community Development Officer
• NAC will enter into  a 25 year lease with ACDT for South Beach
site on which playpark, café, beach huts and other facilities will
be located.
• NAC gardeners will continue to maintain the natural
environment at South Beach as part of the lease agreement
arrangements.  ACDT will work in partnership with Streetscene
to employ a modern apprentice to assist  on-site day to day.
Further negotiating will take place with NAC in relation to future
phases of development as funding is secured. 
• ACDT as a community anchor association will also seek to be
involved in the planning and design stage of the new North
Shore Campus providing input from local people on issues
such as transport, leisure facilities management, library
service etc  
Cunninghame
Housing
Association
• £5000 Match funding contribution to Stage 1 Our Place/Lottery
Funding
• Provision of Office, meeting and training space for ACDT
within Frank Sweeney Enterprise Centre at peppercorn rent
• Service level agreement for ACDT to provide managed
reception service at the Frank Sweeney Centre.
• Ongoing development support to ACDT Board from CHA’s
Head of Social And Economic Development 
• Annual funding to ACDT overheads and operational costs from
23/24  
Whitlees
Community
Centre
• Development opportunity for Whitlees to operate new
community café at South Beach project  
Three Towns
Growers
• Opportunities to identify linkages and volunteering
opportunities between the community café and the allotments
and associated projects

Page 33

29 
Sustrans • Ardrossan Connections project team have identified
opportunities to design and implement high-quality public
space and upgrades to the National Cycle Network (the
Network) and the area it serves. Improving the Network in
Ardrossan will build on recent and ongoing transport and
planning developments in the area, enabling the route
to act as a high-quality connection to the centre of Ardrossan,
ferry terminal and also as a strategic route between the
Three Towns in North Ayrshire.  
Ardrossan
Community Sports
Hub
• Delivery by ACSH staff of fitness activities and partnership
events on the South Beach Promenade site and elsewhere
within the town  
Ardrossan Castle
Heritage
• Anticipate partnership working to establish a partnership with
Ardrossan Castle Heritage Society to improve the local tourist
infrastructure by highlighting links between the South Beach
Promenade and the nearby Ardrossan castle   
National Lottery  • The National Lottery Our Place Programme provided Funding
of £274,542 towards the construction of an Inclusive Playpark
on the South Beach Promenade in Ardrossan.  
Energyfarm UK
Sorbie LLP
• ACDT will work with this windfarm developer to manage a
Community Benefit Fund for Ardrossan, overseeing and
administering the distribution of funds to community groups.  
South Beach Care
Home 
• Providing opportunities for local Care Home Residents to be
able to get onto the beach on Disabled Wheelers

Page 34

30 
10. FORWARD PLAN – 2023/2024 
Annual Action Plans will be developed by the Community Development Officer and presented
to the ACDT Board of Trustees for approval. This section summarises some of the key tasks
which ACDT require to undertake in the 2023/2024 period in response to the issues set out in
the SWOT above. 
Community Forum 
Create a community forum that will bring together community members and groups to promote
working together to improve the local community, addressing many of the issues and concerns
that we have. This will help underpin the relationship not only with community groups but with
our key partner Cunninghame Housing Association. 
The Community forum can be used to: 
• Provide an opportunity to share all the great things which are happening in the local area,
as well as to discuss and collectively address local issues and concerns.
• Support individuals and groups to be actively involved in the community through
connecting with other people and groups, enabling the sharing of ideas, and providing
access to support and funding.
• Engage with each other about local priorities and provide opportunities to influence plans
and services which will impact on our local area.
• Focus on wider community issues rather than individual complaints or individual case work
issues. 
Continued Promenade development 
Continue the regeneration of the South Beach Promenade, promoting use and public
participation in community wealth building. 
• Continue to seek uplift in funding to finance Phase 1 of the plans detailed previously
• Construct the new Playpark, Maze, Crazy Golf and Community Hub & Beach Huts within
the agreed timelines. This will see construction start February and be completed by the
end of July.
• Seek funding to complete phase 2-4 of the promenade regeneration in.
• Plan for phase 2-4 of the South Beach regeneration to take place.
• Hire a modern apprentice in partnership with Streescene to care for the landscaping of the
area covered in phase 1. 
Employability & Staff Development - 
As it continues to develop ACDT will seek to find funds and use employability programmes
to sustain the employment of existing staff and provide paid opportunities for unemployed
local residents within the planned projects at South Beach, its main base at the Frank
Sweeney Centre and its satellite office at 6 Glasgow St, Ardrossan. This will include: 
• Securing further funding to maintain the Community Development Officer Position which
is fundamental to the day to day management of the organisation.
• Manage/staff to ensure full time provision on the Crazy golf and Wheeler/
Hippocamp/Deckchair project full time during peak season, 7 days per week 11 am – 6
pm.

Page 35

31 
• Provide reception cover at its main base, The Frank Sweeney Centre 82-84 Glasgow St,
Ardrossan, 9am – 5pm weekdays.
• Develop staff, providing worthwhile qualifications/training that allow personal growth. 
Advocacy Project - 
ACDT are in the process of setting up a partnership project with Ardrossan Community Sports
Hub (ACSH) and Community Housing Advocacy Project (CHAP) to provide the local
community with an advocacy worker who will give advice on housing, benefits, money, and
welfare matters. Based at the 6 Glasgow Street satellite office, this will be a vital support to
the community during the cost-of-living crisis, particularly as we live in an area of multiple
deprivation. 
Event Organisation 
Lead the community in an event calendar promoting all that takes place within the community,
incorporating new events and promote community well-being initiatives in general. These
events could be based on the following range of activities: 
• Debt, money advice and benefits support
• Short term financial help in a crisis
• Housing advice
• Access to low-cost food
• Practical support to improve mental health
• Finding employment/Advice on employment issues
• Keeping active and healthy
• Achieving a healthy weight for the whole family
• Improving your cooking skills on a budget
• Managing type 2 Diabetes
• Stopping smoking
• Practically and emotionally support to help you build confidence, independence and
connecting you to your local community

Page 36

32 
11. MANAGEMENT AND GOVERNANCE 
11.1 Board of Trustees  
Ardrossan Community Development Trust’s Board meet on a monthly basis on 2nd Monday of
the month. We currently have 10 Board members, with a range of skillsets and significant
experience within work and community settings – ranging from senior management within a
local housing association, university lecturing, training management, engineering and the
social care sector to retailing, managing community based organisations, tenant and resident
associations and neighbourhood watch schemes. 
Summary profiles for each Board member are contained in Appendix 1. 
11.2 Staffing Roles and Responsibilities 
ACDT is keen to ensure paid employment opportunities are created for local residents and to
this end have the following staffing structure in place. 
Community Development Officer 
During early 2022 ACDT secured £53,100 funding from North Ayrshire Council’s Community
Investment Fund to support the initial 18 months of salary and expenditure for a Community
Development Officer to ensure existing projects move forward to completion and respond to
emerging needs for further development opportunities. Recruitment to the Community
Development Officer post was completed in June 2022, with a local Ardrossan resident
appointed to the role.  
The main duties of the Community Development Officer post, which reports directly to the
Board, include:  
• Initiate and develop projects and services to meet  identified community needs
• Carry out feasibility work, identify potential funding sources, and manage resources as
required. 
• Implement project planning, including defining deliverables, setting goals and
objectives, producing schedules and timescales, identify and manage risks.
• Supported by the ACDT Board, facilitate and motivate teams formed for individual
projects (which may involve Directors / Volunteers / Contractors / Staff / Funders),
ensuring clear communication of key information and supporting good governance.
• Work with the Company Treasurer to ensure project budgets are defined, managed
and adhered to in line with funding requirements. 
• Carry out monitoring and control activities to track the progress of projects and record
outcomes, reporting progress regularly to the ACDT board
• Attend meetings to deliver updates to the ACDT and the Community.       
In addition we have recently appointed a full time Receptionist based at the Frank Sweeney
Centre for Enterprise. ACDT have entered into a service level agreement with Cunninghame
Housing Association to provide a managed reception service for the Sweeney Centre. 
Consequently our Receptionist undertakes a range of duties including: 
• receiving visitors; 
• managing room bookings for training and conference facilities; 
• liaising with CHA regarding report of repairs;

Page 37

33 
• and provision of administrative and clerical support to ACDT’s Community
Development Officer. 
Temporary Employees – Employability Programme 
We have also managed to create posts for 2 temporary Customer Contact roles at our South
Beach, funded via local and national employability programmes, and who carry out the
following range of duties on the basis of 25 hours per week: 
• opening and securing at the beginning and end of the day of ACDT’s storage facility
housing the disabled wheelers and deckchairs; 
• issuing disabled wheelers to wheelchair users to access the beach, completing
associated paperwork; 
• issuing deckchairs to customers, completing records and ensuring chairs are returned; 
• taking payment for the issue of golf balls and putters to be used on crazy golf site and
cashing up at the end of the day; 
• cleaning/sanitizing items on return to the facility 
• any other general duties required by the Community Development Officer 
These posts are for fixed time periods of 6 months in the first instance, with the possibility of
extensions subject to progress and the availability of additional funding. 
ACDT are a Real Living Wage employer and will formally pursue this accreditation going
forward. 
Our current staffing structure is summarised in the chart below 
ACDT Board -
Chair
Community
Development
Officer
Receptionist
Customer
Contact
Asssitant
Customer
Contact
Asssitant

Page 38

34 
11.3 Future Staffing Proposals 
Going forward ACDT aim to: 
• Secure funding to extend the contract for our Community Development Officer beyond the
initial 18-month period and are currently pursuing grant funding opportunities in this regard
including the Scottish Government’s Strengthening Communities Fund
• Secure funding to extend the contract for our Receptionist at the Frank Sweeney Centre
for Enterprise, with grant funding being pursued to supplement the fee income secured
from CHA for the provision of the managed reception service.
• Work with North Ayrshire Council’s Employability service to provide temporary
employment opportunities for 2 staff, both on a 25 hour per week basis, at Ardrossan South
Beach in order to oversee the operation and administration of the new playpark and beach
hut facilities scheduled for completion in mid-2023, in addition to the existing deckchairs
and disabled wheelers facility. 
In preparing the Plan we consulted with North Ayrshire Council Employability Services as
they will be the key agency who will manage access to employability funding. 
During 22/23 a long term unemployed paid placement programme was created within North
Ayrshire which ACDT were able to use to support our existing temporary staff posts. It is
possible that a similar programme will continue next year but, at the time of writing, funding
allocations for next year are still to be confirmed as are potential programmes. 
North Ayrshire, like all other local authorities, have been given an allocation of UK Share
Prosperity Funding and have submitted a prospectus with outline proposals on how this will
be funded. It is anticipated that over the 22/23 to 224/25 period c£2.9m of People and Skills
funding will be available through this source, in addition to funding from the Scottish
Government No One Left Behind programme. Funding is likely to continue to be targeted
towards young people, parents and generally those furthest from the labour market – with
significant emphasis being place on community engagement and working with community
based organisations to create opportunities. 
On this basis within the income assumptions underpinning this plan we believe it is realistic
to: 
• Provide for wages costs for 4 trainee posts per annum – with wages set at National Living
Wage levels as would be required through these grant programmes
• Provide for employability income which covers c 90% of these wages costs – experience
to date indicates that it is realistic not to expect full cost recovery and consequently the
Business Plan assumes net costs (after employability income) to support these 4 posts
per annum of c£7000 per annum

Page 39

35 
12. PREMISES AND RESOURCES 
ACDT currently lease office premises within the heart of Ardrossan which provide access to
excellent resources and are also expanding our operations by taking further occupancy of the
South Beach promenade within Ardrossan in the near future. 
12.1 Frank Sweeney Centre For Enterprise 
This is where we currently base our Development Officer and other core staff. This building 
measures in total at 7,675 sq. ft over two floors. The centre is based in an ideal town centre
location on Glasgow Street for ACDT to operate out of and consult with the local population
and our members. 
The office space that ACDT occupy within this building measures is over 600sq ft. These
Office premises have been secured by ACDT on a three-year lease starting April 1st 2022 –
with the Trust having negotiated a peppercorn rent of £1.00 per annum with local landlord
Cunninghame Housing Association for the duration of the lease. These premises allow ACDT
to gain access to modest office space, state of the art meeting room facilities, common areas
and off street car parking facilities from 7am to 10pm on weekdays. In addition ACDT’s lease
is fully inclusive of rates, heat and light charges, office cleaning, buildings insurance and
commercial refuse collection charges – reflecting the significant developmental support
provided by CHA to the Trust. 
The office space is used as an organisational base from 9am – 5pm during its weekly opening
hours. Furthermore ACDT currently utilise the 2 large meeting/training rooms which can be
used flexibly for a range of purposes from board meetings, training sessions, seminars,
conferences and workshops. When opened together into one space the rooms can host up to
100 people theatre style for community events. 
The Centre has a large reception space with 3 adjacent communally available interview rooms
for tenants to use as and when required. The facility is also fully accessible and DDA compliant
with lifts installed to maximise free movement around the building. ACDT have access to a
large, shared kitchen area providing canteen facilities for staff and catering facilities for
meetings, training, and events. 
12.2 South Beach Promenade 
ACDT are currently in negotiations with North Ayrshire Council on a 25-year lease on an area
of land at the South Beach Promenade in Ardrossan. This lease will enable ACDT to act on
previously developed community consultation information that highlights the need to further
develop the local infrastructure in the Ardrossan area to benefit the lives and leisure facilities
for Ardrossan’s local residents and ACDT trust members. The Trust have already secured a
substantial amount of capital grant funding and aim to secure a lease on the area before
developing new facilities on the site including a coffee shop, a new crazy golf course, playpark
and beach huts. 
These will complement the existing resources which ACDT currently operate on this site –
namely a 2x6 metre container that is split into 2 sections with 1 section being a small office
space and the other being storage space for our disability Wheelers, Hippocamps and
Deckchairs which can be rented by the public. The container has external advertising
promoting the project to passers-by and the general public. This facilities operating 
times/periods are May – September between 11 am and 6pm and available for groups at all
times via e mail application.

Page 40

36 
13. RISK ANALYSIS 
Following a range of important development work during 2021 and 2022 ACDT has now
established significant momentum and has begun to assemble and manage significant capital
and revenue funding; employ full time and temporary staff; take on leases with CHA and North
Ayrshire Council; will shortly undertake a procurement exercise prior to entering into contracts
with main constructor contractors; and will be responsible for the subsequent operational
management of important new facilities at South Beach. 
As part of its approach to governance the ACDT Board have identified a number of key risk
set out in the table below – together with actions planned to mitigate these. 
Using these as an initial platform, an organisational risk register will be developed and
maintained going forward by the Community Development Officer with regular updates
provided to enable the ACDT Board meetings to review risks and the measures in place at
Board meetings. 
Risk Description Mitigating Actions
Reputational Risk: Cost
inflation may increase scale
of capital funding which
ACDT need to secure to
deliver on community
aspirations re playpark and
other facilities at South
Beach 
● Lottery, RCGF and NAC funding already in place
● Maintaining effective working relationships with key
funders and partners including Lottery, Scot Govt and
NAC – keeping them up to date
● In principle agreements in place with Lottery and RCGF
regarding potential for ACDT to approach them for top
up capital funding once tender exercises have
established final costs.
● Potential for cost savings exercises to be undertaken in
consultation with Design Team and funders if required 
Financial Risk : Potential for
contractual delays and
potential cost overruns 
● Detailed cost plans produced by Design Teams include
provision for contingencies and price increase 
● Regular progress meetings will take place between
project team including ACDT representatives, Design
Team and contractors to identify issues early and agree
and implement solutions 
● Design Team will produce frequent valuations/cost
reporting and variations checking – with resultant
feedback to identify and agree cost control measures
and early remedial actions 
Financial Risk: Failure to
meet income and funding
targets required to sustain
ACDT business model 
● 5 year income and expenditure projections based on
clear assumptions and realistic targets to be adopted by
ACDT Board in late 2022 – to be updated annually based
on actual income and expenditure from previous year.
● Business Plan to ensure dedicated Community
Development Officer post built into expenditure
projections and grant funding sought for this post to
ensure ACDT has staff capacity to deliver Business Plan
● Ensure effective marketing and promotion of ACDT and
its services and facilities using range of mediums
including social media and community networks
● Ensure continued development of a strong identity and
brand for ACDT, recognition within local community and

Page 41

37 
maintain effective relationships with potential funders
and stakeholders such as NAC and CHA
● Ensure effective financial monitoring in place by staff and
Board of progress in relation to income and expenditure
targets within Business Plan 
Reputational and Financial
Risk: Failure to deliver
activities and outcomes
within funding bids and
Business Plan as agreed
with funders. Management
of disparate funding sources
requires compliance with
associated conditions of
grant
● Ensure clear and shared understanding amongst Board
and staff of terms and conditions of funding and funder
expectations
● Put in place effective project monitoring framework to
track progress against targets and ensure variations are
reported to the Board timeously
● Maintain effective reporting procedures and
management relationships with funders to enable
effective discussion and resolution of potential issues
Business Risk: Increasingly
competitive funding
environment for future
revenue monies to extend
key staff contracts, leading
to loss of core staff 
● Effective relationships developed with key funding
intermediaries e.g. CEiS to secure funding to sustain and
develop ACDT organisational capacity over next 3 years
● Consistent scanning of funding environment to be
undertaken by Community Development Officer to
identify new potential funding streams as they arise
● ACDT Board will ensure projects and funding bids
designed and developed in close alignment with
strategies of key local agencies and that outputs would
make direct contribution to funder targets 
Business Risk: Continual
need to sustain active and
healthy Board of Trustees,
with diverse range of
skillsets and experience to
effectively lead the
organisation
● Carry out organisational health check and Board skills
and training needs analysis to identify development
needs and potential gaps.
● Ensure resources available to support Board learning
and development programme and ensure ACDT make
most of resources available from sector membership
bodies such as DTAS and Social Enterprise Scotland
● As and when necessary activity advertise and recruit for
Board members to address identified skills gaps and/or
maintain effective Boar representation 
Reputational Risk : Adverse
media publicity impacts on
ACDT standing and profile
within community
● ACTD Board and staff to continue to hold communication
and consultation events with ACDT members and
Ardrossan residents to provide feedback on progress,
new ideas and establish ongoing priorities
● Continued effective use of social media and website to
manage ACDT’s profile within community, promote
positive messaging, celebrate successes and highlight
partnership working

Page 42

38 
14. FINANCIAL PROJECTIONS 
ACDT have worked to secure major capital funding to deliver the play park facility, the
redevelopment of the toilet block at South Beach into a café and the installation of a range of
other facilities including beach huts, disabled wheelers, deckchairs and crazy golf.  This final
section of the Plan outlines the indicative capital costs associated with the project and the
proposed funding package. 
ACDT is now moving to a new stage in its development: 
• Town centre premises have been secured;
• A staffing structure is now in place; 
• A lease on the site at South Beach promenade is being finalised with North Ayrshire
Council to enable works on a major capital project to begin which will create new
facilities and income and expenditure streams for ACDT 
This section, therefore, also sets out 5-year financial projections based on key assumptions
on staffing, premises and overhead cost projections and the anticipated trading, contract and
grant funding income necessary to sustain the organisation over this period. 
14.1 Capital Project Funding and Finance 
Based on the most recent cost plans produced by Mike Hyatt Associates (playpark facility)
and TCS Construction Consultants (toilet block conversion and beach huts), the table below
summarises the projected capital costs for these developments. 
Expenditure Item Cost as per
Cost Plans
Play Park Construction  £285,100.00
Play Park Consultancy Fees £ 30,641.63
Toilet Block Rebuild including  Consultancy Fees  £759,216.37
TOTAL COST £1,074,958.00 
The associated capital funding package is also set out in the table below. 
Funder Funding Sought Status
National Lottery Our Place Programme     £274,542.00 Secured
Scottish Government Regeneration
Capital Grant Fund        
£748,000.00  Secured
North Ayrshire Council     £52,416.00 Secured
Total £1,074,958.00 
At the time of writing, in February 2023, ACDT have received tender responses in relation to
the playpark and await tender responses in relation to the toilet block rebuild. Discussions are
also underway with key funders – the National Lottery, Scottish Government Regeneration
Capital Grant Fund and North Ayrshire Council – regarding the potential to access additional
capita funding.  Following receipt of tender responses for the Playpark, the National Lottery
agreed an additional 10% over the initial funding agreed due to material price increases
caused by the pandemic and the war in Ukraine. Tender responses in relation to the toilet
block rebuild may also require to be reviewed with  ACDT working with funders to secure
additional funding where possible and with the Design Teams to value engineer if required to
ensure project delivery. This process could therefore lead to further revisions in the anticipated
costs and associated funding package shown above.

Page 43

39 
14.2 Operating Income and Expenditure Summary and Commentary 
5 year operational income and expenditure projections from April 23 are summarised below –
with a full set of assumptions and an operational cash flow set out in a separate reference
document to this Plan. The projections identify income and expenditure associated with the
Core Team and the operation of the Playpark and South Beach projects. (Please note: these
projections do not include capital expenditure or income associated with the Playpark
installation or South Beach Works which are funded from a mixture of National Lottery, Scottish
Government Regeneration Capital Grant Fund and North Ayrshire Council monies. The capital
expenditure and income associated with this are however shown in our 23/24 Cash Flow.) 
Overall our main income source over the Plan period will be grant income, which is consistent
with ACDT’s aim and purpose and anticipated charitable status. Grant income – including
employability grants to support temporary employees - is expected to contribute c86% of
overall income in Year 1 dropping to 72% in Year 5 as income generation from the South
Beach project grows. 
Grant income has already been secured towards the Development Officer post until late 2023
whilst the Service Level Agreement contract income secured from CHA to manage the
Sweeney Centre contributes significantly towards our Receptionist costs. Additional but as yet
unidentified grant income with be required of £15,000 in Year 1. Positive approaches have
already been made to CEiS, who manage the Scottish Government’s Strengthening
Communities Fund to secure grant funding of c£35,000 pa to support extensions of the posts
from Year 2 to 4, before further grant funding of c£30,000 will be required in Year 5. 
ACDT has worked successfully to date with North Ayrshire Council Employability Service to
secure grant funding to support paid employability opportunities and this is expected to
continue over the duration of the plan – whether this be from local or national employability
programmes, with income assumptions based on current contribution levels with annual uplifts
to reflect associated wage cost increases and based on the New National Living Wage from
April 23. 
We have also had excellent development support from Cunninghame Housing Association for
a number of years, reflected not only in rent free premises within the Frank Sweeney Centre
but also in terms of recent discussions for an annual financial contribution of £10,000 shown
in the projections from Year 1 onwards. 
In terms of income generation, this will come on stream following the completion of the
installation of all of the facilities at South Beach. In Year 1 beach hut, crazy golf, cafe rental
and events income is estimated to contribute just under £20,000 before growing to almost
£49,000 by year 5 as the site becomes established and visitor numbers and usage increases.
We believe realistic hire rates have been assumed for our beach huts, with the hire season
running for no more than 30 weeks. 
Our intention is to lease the café within the hub building on the beach front to a local community
organisation with experience in this area to operate – generating a steady rental income of
c£8-9000 per annum from Year 2. South Beach is an attractive open space which has and will
continue to offer the potential to host a series of events including a fairground and music
events. We have made prudent assumptions about the level of income – ranging from £6000
in Year 1 to £8000 in Year 5 – which can be generated from the hire of the space/site to event
organisers but believe this can be exceeded. Finally as part of the negotiations with North
Ayrshire Council to conclude the lease for the South Beach site, ACDT have agreed to keep
the toilet block at South Beach open to the public for the period April to July 2023 until
demolition works commence to enable construction of the new facility. NAC have agreed to

Page 44

40 
make a funding contribution over this period equivalent to the costs incurred by ACDT to
subcontract this to an appropriate maintenance company. 
Staffing costs will, by some distance, be our largest cost category over the plan period –
accounting for 88% of costs in Year 1 before dropping slightly to 85% by Year 5. ACDT
overhead costs are reduced significantly due to the provision by Cunninghame Housing
Association of office, meeting and training space at a nominal charge. Based on consultation
with the local authority we have made provision for a lease payment for the site at South
Beach, based on a value estimated as a percentage of the rateable value of the site. Given
recent fuel cost hikes we have also made a growing annual provision for utility bills at South
Beach with sizeable stepped increased in Years 2 and 3 before lower increases kick in in
Years 4 and 5. As the South Beach project comes on stream in 2023 we have provided for
additional insurance provision, telephone and IT costs and a budget amounting to £13500
over 3 years (Yrs 3 to 5) for repair and maintenance of South Beach premises and equipment
following the end of defects liability and manufacturer warranty periods 
As part of our core activities we expect to continue to carry out a range of community
engagement and survey work with local residents and groups as we identify priorities, seek
feedback and develop projects. Often we will be able to secure grant funding to support this
activity but to be prudent we have also provided for £6000 of expenditure within our planned
budget in Years 2 and 4 to help support this activity. 
Based on these assumptions, we are budgeting for small annual surpluses across the Plan
period to provide us with the ability to accumulate appropriate levels of reserves for
contingency and organisational development purposes.

Page 45

41 
Ardrossan Community Development Trust Income and Expenditure Projections
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
INCOME 23/24 24/25 25/26 26/27 27/28
Core Team Income
CIF Grant Funding -Development Officer £27,725 £0 £0 £0 £0
Strengthening Communities - Staff Costs £0 £35,000 £35,000 £35,000 £0
CHA Grant Funding £10,000 £10,000 £10,000 £10,000 £10,000
Other Grant Funding £15,000 £0 £0 £0 £30,000
SLA income £17,000 £17,510 £18,035 £18,576 £19,134
Employability Grant £56,000 £58,800 £61,740 £63,592 £65,500
£125,725 £121,310 £124,775 £127,169 £124,634
South Beach Project Income
Beach Hut Hire £5,940 £15,750 £16,650 £18,000 £18,150
Crazy Golf Hire £5,720 £9,724 £10,696 £11,766 £12,943
Café Lease £2,100 £8,400 £9,600 £9,600 £9,600
Events Income £6,000 £6,000 £7,000 £8,000 £8,000
NAC Funding - Toilet Block Servicing £6,000 £0 £0 £0 £0
£25,760 £39,874 £43,946 £47,366 £48,693
TOTAL INCOME £151,485 £161,184 £168,722 £174,535 £173,326
EXPENDITURE
Core Team Expenditure
Staffing Costs
Development Officer £37,170 £39,029 £40,590 £41,807 £43,062
Receptionist £24,780 £25,771 £26,544 £27,341 £28,161
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
Volunteers Expenses £500 £500 £500 £500 £500
£93,877 £98,298 £101,952 £104,996 £108,130
Premises and Overhead Costs
Rent and Rates £300 £306 £312 £318 £325
Insurance £1,700 £1,751 £1,804 £1,858 £1,913
Heat and Light £0 £0 £0 £0 £0
Refuse and Waste Collection £0 £0 £0 £0 £0
Telephone / IT £0 £0 £0 £0 £0
Hardware and Software £1,500 £500 £1,250 £500 £1,250
Printing, Stationery & Office Supplies £750 £773 £796 £820 £844
Premises & Equipment Repair and Maintenance £0 £0 £0 £0 £0
Cleaning and Cleaning Supplies £0 £0 £0 £0 £0
Advertising & Marketing £1,000 £500 £500 £500 £500
Accountancy and Audit £1,500 £1,545 £1,591 £1,639 £1,688
Bank Charges £250 £258 £265 £273 £281
Professional Fees including Legal Costs £2,500 £2,575 £2,652 £2,732 £2,814
Subscriptions £750 £773 £796 £820 £844
Training and Development £600 £800 £800 £800 £800
Health and Safety £500 £515 £530 £546 £563
Event Costs £1,000 £1,000 £1,500 £1,500 £1,500
Community Consultation/Survey Costs £0 £3,000 £0 £3,000 £0
Sundry Costs £500 £515 £530 £546 £563
£12,850 £14,810 £13,327 £15,852 £13,885
South Beach Project Expenditure
Staffing Costs
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
£31,427 £32,998 £34,318 £35,348 £36,408
Premises and Overhead Costs
Rent and Rates £900 £909 £918 £928 £938
Insurance £890 £917 £944 £973 £1,002
Heat and Light £2,000 £3,000 £3,750 £4,125 £4,538
Telephone / IT £720 £720 £742 £742 £742
Premises & Equipment Repair and Maintenance £0 £0 £4,500 £4,500 £4,500
South Beach Toilet Servicing £6,000 £0 £0 £0 £0
£10,510 £5,546 £10,854 £11,267 £11,718
TOTAL EXPENDITURE £148,663 £151,651 £160,451 £167,462 £170,142
ANNUAL SURPLUS / DEFICIT £2,822 £9,533 £8,271 £7,073 £3,184
CUMULATIVE POSITION £2,822 £12,355 £20,626 £27,698 £30,882

Page 46

42 
Appendix 1 ACDT Board of Trustees – Summary Profiles 
Scott Mould – Chairperson ACDT 
Scott moved from Glasgow to Ardrossan in the early noughties and immediately made it his
home. Family commitments seen Scott move back to Glasgow late 2021 however he still
works & volunteers in the Town and is planning a return in the coming years.  With a lifetimes
experience in retail management, as an entrepreneur and experience in marketing Scott set
up two local businesses. Scott is now Head of Social and Economic Development with a local
Housing Association as well as acting as Operations Manager for the Association’s furniture
re-use social enterprise. Scott  was also a Director of Ardrossan Community Sports Hub SCIO,
and played an integral role in creating a new community asset by developing a new community
gym within Ardrossan. In his current role as Gym Lead Scott takes  a key role in helping the
organisation sustain and develop this asset and in securing its future.   
Christine Powell – Company Secretary / Vice Chair 
Christine has lived most of her life in Ardrossan, aside from a short period in Saltcoats and
worked in Saltcoats Jobcentre for 35 years from the age of 17 and left after a period of critical
illness. Christine is now a training manager working to train people in ASN childcare and has
helped create several local companies to assist the local economy. Christine and her husband
set up home back in Ardrossan and created the Neighbourhood Watch Scheme for the area
and then progressed into a Resident and Tenants Association. 
Hugh Delahunt – Secretary 
Hugh joined the Board at our AGM in 2022 and is a 59 year old Senior Project Manager and
former Senior Site Engineer employed in large Rail Engineering projects and has worked
around the UK in this field for some 23 years. Prior to that he obtained degrees in both Civil
Engineering and Construction Management from Glasgow Caledonian University after
returning to academic studies in his late thirties after various jobs in transport and construction.
He resides in Ardrossan on South Beach and has a keen interest in the potential for upgrades
to the community areas around the town. 
Steven Higgins – Treasurer 
Steven lives in Ardrossan with his family and is the Co-Founder of award winning PowerTek
Utilities and E&S Utilities. Under his leadership they have grown rapidly and employ over 100
people. Steve is committed to helping to deliver a net-zero carbon future. 
For years Steven has been involved in the construction of renewable projects from single wind
turbines to large scale wind farms as well as hydro and solar farms. Steven is also an early
pioneer in the build out of electrical vehicle (EV) charging infrastructure across the UK. Steven
brings a depth of business management to the Trust that will serve it well in the years to come. 
Viki Powell - Director 
Viki was nominated to the Trust Board in June 2021. She moved from Saltcoats to Ardrossan
at the age of two with her parents who set up a local Neighbourhood Watch scheme in
Ardrossan; and later the Residents and Tenants Association. Viki grew up with a strong sense

Page 47

43 
of local community and empowerment and as an adult has become more and more involved
in community activities and projects and now wants to have a more direct impact in
Ardrossan’s growth and future. She is passionate about her Town, its shorefront and stunning
views to Arran and Ailsa Craig. 
June Strang -  Director 
June joined the Board of the Trust on 30th June 2021.June was born in Glasgow, and as most
Glaswegians do came to the coast during the Glasgow fair before moving to Saltcoats and
then Ardrossan at the age of 14 age  which has been her home ever since. Aspiring to be
active in making Ardrossan a better place to live, June followed the Ardrossan Town Centre
Initiative (ATCI) and then became a member of Ardrossan Community Development Trust
(ACDT) to get involved in a totally new experience making Ardrossan a better place for
residents and visitors alike. June looks forward to continuing the work already started by the
Trust and get actively involved to further develop and progress the communities’ ideas. 
Elizabeth Hardie - Director 
Elizabeth joined the Board of the Trust on 30th June 2021. A local resident all her life, Elizabeth
left school and, amongst other things, worked at Abbotsford Nursing Home in the Town for 10
years as a cook. Elizabeth has also been heavily involved in the operation of the Whitlees
Centre for many years and was also the café cook for 3 years before retiring. She is inspired
in her retirement to continue to assist at the Whitlees Centre and helps out wherever she can.
After learning of the Community Development Trust, their engagement with the community
and plans to raise funds and develop Ardrossan for its residents and visitors she had to get
involved. 
Julia Gray – Director 
Julia joined the Board of the Trust on 30th June 2021. Julia was born and brought up in
Ardrossan and was educated at Stanley Primary School and Ardrossan Academy. After
leaving school she spent 22 years working in McLaren Nursery followed by a few years in
retail before going into the care sector. Julia has been involved in the Whitlees Community
Centre since 2014 initiating huge improvements in what the Centre delivered for Ardrossan
and its local community and she is still heavily involved in the activities of the centre to this
day. Aside from this Julia is also a mother of 3 and is involved in other local community groups.
Julia is passionate about her Town and it’s future, helping its residents wherever she can
ensuring that local residents are at the heart of change and have their voice. 
Marisa Stevenson - Director 
Marisa joined the Board of the Trust on 30th June 2021.Marisa’s family has always been born
and bred in Ardrossan and apart from her living for 5 years as a ‘Doonhamer’ in Dumfries in
the late eighties she has always lived here. She is a Nurse Lecturer at the University of The
West of Scotland responsible for teaching Post graduate Specialist Community Health Nurses
from all over the United Kingdom. Marisa also has a strong sense of Community and is
passionate about the Town, in particular the Shore front and the Cannon Hill.

Page 48

44 
Michael McCulloch – Director 
Having lived in Ardrossan all of his life, Michael has spent the last 2 years in Saltcoats. Michael
spent all his childhood and early adulthood in Princes St, right in the heart of the Town, with
South Beach, down the “inches” and Ardrossan harbour as his playgrounds and remembers
Ardrossan as a busy place “full of life” and a great place to live. Having served his
apprenticeship in engineering with ICI in Stevenston, Michael went on to work in many
engineering projects at home and away before expanding his career into Social Services.
Michael has always been involved in local groups and issues of importance and was involved
in the successful campaign to keep the Arran Ferry sailing from Ardrossan. Having a great
interest in local history he is a trustee of the Castle Heritage Society.

Page 49

1 
Ardrossan Community Development Trust
Business Plan 
Appendix 
5 Year Financial Projections

Page 50

2 
Ardrossan Community Development Trust Income and Expenditure Projections
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
INCOME 23/24 24/25 25/26 26/27 27/28
Core Team Income
CIF Grant Funding -Development Officer £27,725 £0 £0 £0 £0
Strengthening Communities - Staff Costs £0 £35,000 £35,000 £35,000 £0
CHA Grant Funding £10,000 £10,000 £10,000 £10,000 £10,000
Other Grant Funding £15,000 £0 £0 £0 £30,000
SLA income £17,000 £17,510 £18,035 £18,576 £19,134
Employability Grant £56,000 £58,800 £61,740 £63,592 £65,500
£125,725 £121,310 £124,775 £127,169 £124,634
South Beach Project Income
Beach Hut Hire £5,940 £15,750 £16,650 £18,000 £18,150
Crazy Golf Hire £5,720 £9,724 £10,696 £11,766 £12,943
Café Lease £2,100 £8,400 £9,600 £9,600 £9,600
Events Income £6,000 £6,000 £7,000 £8,000 £8,000
NAC Funding - Toilet Block Servicing £6,000 £0 £0 £0 £0
£25,760 £39,874 £43,946 £47,366 £48,693
TOTAL INCOME £151,485 £161,184 £168,722 £174,535 £173,326
EXPENDITURE
Core Team Expenditure
Staffing Costs
Development Officer £37,170 £39,029 £40,590 £41,807 £43,062
Receptionist £24,780 £25,771 £26,544 £27,341 £28,161
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
Volunteers Expenses £500 £500 £500 £500 £500
£93,877 £98,298 £101,952 £104,996 £108,130
Premises and Overhead Costs
Rent and Rates £300 £306 £312 £318 £325
Insurance £1,700 £1,751 £1,804 £1,858 £1,913
Heat and Light £0 £0 £0 £0 £0
Refuse and Waste Collection £0 £0 £0 £0 £0
Telephone / IT £0 £0 £0 £0 £0
Hardware and Software £1,500 £500 £1,250 £500 £1,250
Printing, Stationery & Office Supplies £750 £773 £796 £820 £844
Premises & Equipment Repair and Maintenance £0 £0 £0 £0 £0
Cleaning and Cleaning Supplies £0 £0 £0 £0 £0
Advertising & Marketing £1,000 £500 £500 £500 £500
Accountancy and Audit £1,500 £1,545 £1,591 £1,639 £1,688
Bank Charges £250 £258 £265 £273 £281
Professional Fees including Legal Costs £2,500 £2,575 £2,652 £2,732 £2,814
Subscriptions £750 £773 £796 £820 £844
Training and Development £600 £800 £800 £800 £800
Health and Safety £500 £515 £530 £546 £563
Event Costs £1,000 £1,000 £1,500 £1,500 £1,500
Community Consultation/Survey Costs £0 £3,000 £0 £3,000 £0
Sundry Costs £500 £515 £530 £546 £563
£12,850 £14,810 £13,327 £15,852 £13,885
South Beach Project Expenditure
Staffing Costs
Trainee Allowances £31,427 £32,998 £34,318 £35,348 £36,408
£31,427 £32,998 £34,318 £35,348 £36,408
Premises and Overhead Costs
Rent and Rates £900 £909 £918 £928 £938
Insurance £890 £917 £944 £973 £1,002
Heat and Light £2,000 £3,000 £3,750 £4,125 £4,538
Telephone / IT £720 £720 £742 £742 £742
Premises & Equipment Repair and Maintenance £0 £0 £4,500 £4,500 £4,500
South Beach Toilet Servicing £6,000 £0 £0 £0 £0
£10,510 £5,546 £10,854 £11,267 £11,718
TOTAL EXPENDITURE £148,663 £151,651 £160,451 £167,462 £170,142
ANNUAL SURPLUS / DEFICIT £2,822 £9,533 £8,271 £7,073 £3,184
CUMULATIVE POSITION £2,822 £12,355 £20,626 £27,698 £30,882

Page 51

3 
Ardrossan Community Development Trust Operational Income Projections
Core Team Income
Grant Funding - Staff
Staff Funding
Employability Funding  - Trainees
Grant Income Summary for Core Staff Costs YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
CIF Grant Funding - Development Officer £27,725 £0 £0 £0 £0
Strengthening Communities Grant  Staff Costs £0 £35,000 £35,000 £35,000
Service Level Agreement Income £17,000 £17,510 £18,035 £18,576 £19,134
CHA Grant Funding £10,000 £10,000 £10,000 £10,000 £10,000
Other Grant Funding £15,000 £0 £0 £0 £30,000
£56,000 £58,800 £61,740 £63,592 £65,500
Wage Recovery Rate  Increase Per Annum 5% 4% 3% 3%
South Beach Project Income
Beach Hut Hire
Employability Grant
These assumptions set out anticipated revenue income sources for the core operation of Ardrossan Community Development Trust 
and its premises at the Frank Sweeney Centre, Glasgow Street, Ardrossan and the operation of the South Beach promenade facilities.
Capital and income expenditure assumptions for the South Beach Project are not included as these will be funded separately via
Lottery Funds, Scottish Government RCGF amd North Ayrshire Council with the intention being that these are delivered at zero net
cost to ACDT. The capital income and expenditure for these will be shown in the Yr 1 cash flow.
ACDT secured NAC Community Investment Fund monies of £53100 for 100% of salary costs of a Development Manager for 18
months beginning in June 2022. Based on expected 22/23 salary commitments we anticipate that £27725 will be available to
support the posts in 2023/2024. ACDT have been approached by CEIS to bid for Strenghtneing Communities Funding from Aprul 24
onwards with up to £40k pa available for 3 years.  This is is expected to be successful to support Staffing Costs from Yrs 2 to 4 - we
have assumed a £35k pa contribution   An amount of as yet unidentified grant funding has been provided for in Year 1 and 5 of £15k
and £30k respectively - we believe this to be realistic given ACDT's track record in securing funding and given expected charitable
status with applications to programmes such as Investing in Communities, the Lottery, Trust Funders and other local and national
sources to be submitted for ongoing grant support for Staff Costs as necessary.
CHA pay service level agreement income to ACDT to manage the Frank Sweeney Centre of £17000 per annum - assume this increases
at 3% per annum over 5 year period. ACDT also expect to secure an annual Grant contribution of £10,000 from CHA.
ACDT  plan to host 4 paid trainee posts annually paid for by Employability Funding available through local/national programmes.
Each placements will be for 26 weeks. The wage recovery rate (employability grant) shown below for NAC Long Term Unemployed
Grant programme for 22/23 was £10000 per post over 26 weeks. However it is uncertain whether this will be replicated. For the
purpose of this Plan we have assumed a figures of £14000 across 52 weeks per post for Year 1 . Thereafter Employability income per
placement is assumed to rise in parallel with the associated wage increases for these posts assumed within the expenditure
projections
The South Beach Promenade will provide beach huts for hire by local traders. The table below shows projections for the no of huts,
no of weeks hire per annum and weekly hire cost.
One of the 6 huts will be used to support electric bike charging and cycle parking to provide a maintenance/repair hut and will not
therefore generate any income.

Page 52

4  
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
No of Huts 5 5 5 5 5
No of weeks hire per annum 12 30 30 30 30
Weekly Hire Cost £99 £105 £111 £120 £121
Total Income from Beach Hut Hire £5,940 £15,750 £16,650 £18,000 £18,150
Year 1 12 weeks 10% increase
Rental from 1st August to 28th October 23
£16.50 daily rate x 6 days weekly
Year 2 30 weeks
Rental from 1st April to 28th October 24
£17.50 daily rate x 6 days weekly
Year 3 30 weeks
Rental from 31st March to 27th October 25
£18.50 daily rate x 6 days weekly
Year 4 30 weeks
Rental from 30th March to 26th October 26
£20.00 daily rate x 6 days weekly
Year 5 30 weeks
Rental from 30th March to 26th October 26
£20.00 daily rate x 6 days weekly
Free access 2 weeks pre-Xmas
Crazy Golf Hire
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
April - June Hire Number of Days 6 6 6 6
Number of Rounds 22 24 27 29
Cost Per Round 2£                  2£                2£                    2£                    
Number of Weeks 13 13 13 13
Total Income £3,432 £3,775 £4,153 £4,568
July - Sept Hire Number of Days 6 6 6 6 6
Number of Rounds 30 33 36 40 44
Cost Per Round 2£                     2£                  2£                2£                    2£                    
Number of Weeks 13 13 13 13 13
Total Income £4,680 £5,148 £5,663 £6,229 £6,852
Oct - Mar Hire Number of Days 2 2 2 2 2
Number of Rounds 10 11 12 13 15
Cost Per Round 2£                     2£                  2£                2£                    2£                    
Number of Weeks 26 26 26 26 26
Total Income £1,040 £1,144 £1,258 £1,384 £1,523
Total Income £5,720 £9,724 £10,696 £11,766 £12,943
Crazy golf will be provided with hire of clubs and access to course at £2 per round.  It is anticipated this will be busier during better
weather. Estimates are based on 12 months income with July to September being the peak period followed by April to June and
limited income over the winter. Assumed Crazy Golf hire will not proceed until July 23 due to installation works on South Beach

Page 53

5 
Café Lease
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Amount Per Month £700 £700 £800 £800 £800
Number of Months 3 12 12 12 12
Café rental income £2,100 £8,400 £9,600 £9,600 £9,600
Events Income
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Events Income £6,000 £6,000 £7,000 £8,000 £8,000
NAC Funding - Toilet Block Servicing
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
NAC Funding - Toilet Block Servicing £6,000 £0 £0 £0 £0
NAC will provide funding support to enable ACDT to assume responsibility for keeping the South Beach toilet block open over the
period April to May 23 until demolition works commence.
ACDT intend to lease the café on site at South Beach to a community partner / SME to operate. It is assumed this will generate
annual rental income as shown in the table below based on  Yrs 1 and 2 lease income of  £700/month rising to £800/month in Yrs
3,4 and 5 . In Year 1 it is assumed the cafe will be operational for only 3 months to allow for an initial rent free period.
ACDT will lease the South Beach promenade from North Ayrshire Council and will be able to generate net income (ie after costs)
hiring the site for a series of local events .  It is believed that c£4k per income is generated per annum from the annual fairground
which comes to the site during the summer. The plan also assumes additional events related income from Music events, Gala Days
events - with the table below outlining  anticipated income streams.

Page 54

6 
Ardrossan Community Development Trust Operational Expenditure Projections
Core Team Expenditure
Staff Costs
No. Staff No. Hrs No Wks
Wage
Rate Per
Hr
Sub Total
Per Annum
NI and
Pension@
18%
Total
Development Officer 1 35 52 £30,000 £5,400 £35,400
Receptionist 1 35 52 £20,000 £3,600 £23,600
Trainees Funded by Employability Grants 2 25 52 £10.42 £27,092 £4,335 £31,427
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Wage Increase Per Annum 5% 4% 3% 3%
Development Officer £37,170 £39,029 £40,590 £41,807 £43,062
Receptionist £24,780 £25,771 £26,544 £27,341 £28,161
Trainees Funded by Employability Grants £31,427 £32,998 £34,318 £35,348 £36,408
Volunteer Expenses
A nominal annual provision has been made   of £500
This is to cover out of pocket travel and subsistence expenses
Premises and Overhead Costs
Rent and Rates
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Rent and Rates £300 £306 £312 £318 £325
These assumptions set out anticipated revenue income sources for the core operation of Ardrossan Community Development Trust  and its
premises at the Frank Sweeney Centre, Glasgow Street, Ardrossan and the operation of the South Beach promenade facilities.
Capital and income expenditure assumptions for the South Beach Project are not included as these will be funded separately via Lottery Funds,
Scottish Government RCGF amd North Ayrshire Council with the intention being that these are delivered at zero net cost to ACDT. The capital
income and expenditure for these will be shown in the Yr 1 cash flow.
ACDT have a Development Officer in post to take forward the work of the organisation within the local community. The current annual salary for
the post is set out below together with assumed uplift per annum.
Training Opportunities
ACDT had an exisitng Trainee in 22/23 who will convert to Full Time Receptionist in April 2023. ACDT also aims to create paid employment and
training opportunities for local unemployed residents through local and natonal employability programmes, with 1 paid trainee posts assumed
each year of the Plan period. Assume 2 New trainees go through the post each year (ie Each Trainee gets 26 weeks). The wage rate for these post
is equivalent to the National Living Wage which for April 23 is £10.42. Grant income associated with these posts is set out within the Income
Assumptions Section.
ACDT lease office space from CHA in the Frank Sweeney Centre for Enterprise in Ardrossan. The annual cost of the combined rent and service
charge is £3404. However CHA provides this office space free of charge - as a result no expenditure provision for rent is required.
An  annual provision of £300 for water rates has also been assumed.  An annual uplift of 2% has been assumed.
ACDT is seeking charitable status and on this basis the Plan assumes 100% business rates relief.
CORE OPERATION STAFF COSTS

Page 55

7 
Insurance
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Insurance £1,700 £1,751 £1,804 £1,858 £1,913
Heat and Light
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Heat and Light £0 £0 £0 £0 £0
Refuse and Waste Collection
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Refuse and Waste Collection £0 £0 £0 £0 £0
Telephone / IT
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Telephone / IT £0 £0 £0 £0 £0
Hardware and Software
An initial sum in Yr 1 for PC's/laptop and  software for staff/ Committee has been assumed of £1,000
Further hardware provision has been assumed in Yr 3 and 5 of £750
Plus annual licence/mgt costs have been assumed of £500
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Laptop and Hardware £1,000 £750 £750
Annual Licence/Mgt Cost £500 £500 £500 £500 £500
Total £1,500 £500 £1,250 £500 £1,250
ACDT insurance provision for the core operation covers Management Liability & a combined Commercial Package. Previous costs for 2021/2022
were £896+714.03 = £1610.03. On this basis the estimated cost in Year 1 is £1700. Assume 3% uplift pa Yrs 2 to 5.
Utility Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service charge which forms the annual
rent costs. Therefore no annual provison is required.
Refuse and Waste Collection Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service charge
which forms the annual rent costs. Annual provision has been made within these projections of £0.
Telephone and IT Connectivity Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service charge
which forms the annual rent costs. Annual provision has been made within these projections of £0.

Page 56

8 
Printing, Stationery & Office Supplies
A nominal annual provision has been made  for these costs of £750
Assumption of 3% uplift provision per annum
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Printing & Stationery Etc £750 £773 £796 £820 £844
Premises & Equipment Repair and Maintenance
Building maintenance at the Frank Sweeney Centre is CHA's responsibility and part of the service charge.
ACDT only have a single office within the facility and limited equipment Annual Provison of £0
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Repair & Maintenance £0 £0 £0 £0 £0
Cleaning and Cleaning Supplies
Cleaning Costs for ACDT's core operation at the Frank Sweeney Centre for Enterprise are included within the service
charge which forms the annual rent costs. Therefore no annual provision has been made within these projections
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Cleaning and  Supplies £0 £0 £0 £0 £0
Advertising & Marketing
In order to market and promote ACDT throughout the local community a sum has been provided for of £1,000
within these projections for Year 1. Further annual provision has been made of £500
These costs are assumed to include Website and other mediums and also provison for South Beach Project.
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Advertising & Marketing £1,000 £500 £500 £500 £500
Accountancy and Audit Fees
Annual provision for accountancy and audit costs - based on previously incurred levels for similar Third Sector Organisations
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Accountancy and Audit £1,500 £1,545 £1,591 £1,639 £1,688

Page 57

9 
Bank Charges
A nominal annual provision has been made  for these costs of £250
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Bank Charges £250 £258 £265 £273 £281
Professional Fees including Legal Costs
ACDT are likely to incur professional legal fees as the organisation is established and evolves
An annual provision of £2,500 has been assumed for this purpose
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Professional Fees £2,500 £2,575 £2,652 £2,732 £2,814
Subscriptions
ACDT will have membership fees and subscriptions for sector bodies in order to access information, good practice,
training and networking benefits. An annual provision of has been assumed for this purpose of £750
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Subscriptions £750 £773 £796 £820 £844
Training and Development
ACDT will want to provide access to training and development for all staff and Board Members.
An annual staff development allocation of £100 per staff member has been assumed
In additon an annual provision has been made for Committee development of £300
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
No. of  staff 3 5 5 5 5
Staff Development Provision £300 £500 £500 £500 £500
Committee Development Provision £300 £300 £300 £300 £300
Total Training and Development Provision £600 £800 £800 £800 £800

Page 58

10 
Health and Safety
A small annual provision for Health and Safety has been made of £500
This includes provision for the Frank Sweeney Centre and the South Beach promenade
Assume uplift of 3% per annum
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Health and Safety £500 £515 £530 £546 £563
Event Costs
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Event Costs £1,000 £1,000 £1,500 £1,500 £1,500
Community Consultation/Survey Costs
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Consultation £0 £3,000 £0 £3,000 £0
Sundry Costs
A nominal annual provision has been made  for these costs of £500
Assume Annual 3% uplift provision
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Sundry Costs £500 £515 £530 £546 £563
South Beach Project Expenditure
No. Staff No. Hrs No Wks
Wage
Rate Per
Hr
Sub Total
Per Annum
NI
Pension@
18%
Total
2 Trainees Funded by Employability Grants 2 25 52 £10.42 £27,092 £4,335 £31,427
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Wage Increase Per Annum Yrs 2 to 5 5% 5% 4% 3% 3%
Trainees Funded by Employability Grants £31,427 £32,998 £34,318 £35,348 £36,408
As part of its core operation ACDT will run numerous local events ranging from community workshops and training to public meetings, AGMs,
project development sessions, local celebrations etc. Whilst specific funding may be able to be accessed for particular events, it is also felt to be
prudent to make a provision within the Plan for a general Events budget to draw on when specific funds are not available. The following
provisions have been made across Years 1 to 5.
ACDT will incur costs in running events at the South Beach Promenade. Within this Business Plan we have chosen to account for these by
providing a net income figure for Events Income for South Beach (ie Income = the profit after costs have been incurred).
ACDT anticipates ongoing consultation and communication with local residents and groups as part of its core work, supplemented by occasional
survey work to help establish, quantify  and evidence local needs, priorities and preferences. On that basis the following provisions have been
made to provide resources to support this activity - as set out below.
South Beach Staff Costs

Page 59

11 
Rent and Rates
ACDT will lease the promenade at South Beach from North Ayrshire Council. Indicative estimates suggest that the annual lease cost
for the site could b c10% of the rateable value of the land (c£6000). So annaul provision has been made of -  £600
It is assumed water rates will also required to be paid towards the toilet block/cafe on South Beach with the bill split with
the café operator. Assume ACDT share is £300 per annum
An annual uplift on water rates of 3% has been assumed
ACDT is seeking charitable status and on this basis the Plan assumes 100% business rates relief.
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Assumed Cost of Lease £600 £600 £600 £600 £600
Water Rates £300 £309 £318 £328 £338
Total £900 £909 £918 £928 £938
Insurance
Further public liability insurance will be required for the facilities on South Beach
The estimated cost for this in Year 1 is £890
Assume 3% uplift pa Yrs 2 to 5
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Insurance £890 £917 £944 £973 £1,002
Heat and Light
Annual provision has been assumed for Utilities costs associated with the South Beach and Playpark project of £2,000
This excludes the utilities associated with the operation of the café as these costs will be the responsibility of the operator.
Given the current fuel crisis assume 50% uplift Pa in Yr2, 25% in Yr 3 to 3 and reducing to 10% per annum in years 4 and 5
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Heat and Light £2,000 £3,000 £3,750 £4,125 £4,538
Telephone and IT
£720
This is equivalent to £60 per month. Assumption of 3% uplift in Yr 3
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Telephone and IT £720 £720 £742 £742 £742
An annual sum has been provided for to cover Mobile telephone lease/hire for the facilities at South Beach of

Page 60

12 
Premises & Equipment Repair and Maintenance
Playpark maintenance.  Assumed provision from Year 3 onwards  as warranty covers 1st 2 years.  £3,000
Annual Beach Huts, Deckchairs and Disabled Wheelers maintenance assumed to be £1,500
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
Playpark Maintenance £3,000 £3,000 £3,000
Beach Hut Maintenance £1,500 £1,500 £1,500
Total £0 £0 £4,500 £4,500 £4,500
Cafe will be leased on basis of a fully insuring and repairing lease agreement - no expenditure
South Beach Toilet Servicing
ACDT will assume responsibility for keeping the South Beach toilet block open over the period April to
May 223 - until the works at South Beach commence and the toilets are demolished to makle way for
the new facility. A provision of £1500 month has been made for ACDT to sub contract servicing to a
maintenance/cleaning company
YEAR YEAR YEAR YEAR YEAR
1 2 3 4 5
23/24 24/25 25/26 26/27 27/28
South Beach Toilet Servicing £6,000 £0 £0 £0 £0

Page 61

13

Page 62

14