NORTH AYRSHIRE COUNCIL 
24 January 2023 
Cabinet 
Title:    Town Centre Fund Update 
Purpose:  To provide an update on the delivery of the approved Town
Centre Fund projects and seek approval for the reallocation of
the balance of funding. 
Recommendation:  That Cabinet: 
(a) Notes the progress made on the implementation of the
agreed Town Centre Fund projects, and the remaining
balance of £147,092 which requires to be allocated
(b) Approves the proposals for the remaining balance of the
Town Centre Fund as detailed at Appendix One; and
(c) Provides delegated authority to the Executive Director
(Place) to agree any future changes to the funding
allocations in consultation with the Portfolio Lead if required 
1. Executive Summary 
1.1 The Scottish Government’s Town Centre Fund was developed to enable Local
Authorities to support their high streets to be more diverse, sustainable and successful
in the face of changing and evolving retail patterns.  Local Authorities received direct
allocations under the Fund, with North Ayrshire Council receiving a total of £1.925m
over two allocations. 
1.2 Cabinet approved the acceptance of the allocations in May 2019 and December 2020
and the expenditure of the allocations on a range of projects in Dalry, Kilbirnie, Millport
and Stevenston. The approved projects are substantially complete, resulting in a
remaining balance of funding of £147,092 that requires to be reallocated to maximise
the spend under the Fund.  The remaining balance is substantially comprised of
unrequired contingency allocations for the identified projects and a proportion of the
asset acquisition fund.  The latter was not utilised due to the private sale of a site
resulting in purchase not being progressed. This report provides an update on
progress on the projects and seeks approval of the proposed reallocation of the
balance of funding. 
2. Background 
2.1 The Town Centre Fund was launched in 2019/20 as part of the Scottish Government’s
economic recovery stimulation package to support town centres to become more

Page 2

vibrant, enterprising and accessible.  It was developed to enable Local Authorities to
stimulate and support a wide range of investments which would encourage town
centres to diversify and flourish and create an increase in footfall through local
improvements and partnerships.   
2.2 The Fund encouraged a balance of larger scale interventions, together with support
for some smaller projects, recognising that splitting funds equally amongst all centres
would dilute potential impact. It recommended that town centre audits, charrettes and
local knowledge inform the process of identifying appropriate projects. 
2.3 North Ayrshire Council received an initial award of £1.418m and a further award of
£0.507m.  Cabinet approved the expenditure of these allocations in May 2019 and
December 2020 on a range of projects in Dalry, Kilbirnie, Millport and Stevenston. 
The projects identified were informed by: 
- The Fund’s conditions and guidance;
- A qualitative scoping exercise informed by town centre audits, conservation area
management plans, charrettes, SIMD data, locality and community priorities and
an assets review;
- Consultation with Elected Members;
- The deliverability of projects within the Fund timescales;
- Consideration of previous and planned investment in town centres; and
- Alignment with the developing actions in the then emerging Regeneration Delivery
Plan. 
2.4 The projects are now predominantly complete.  A summary of the full list of projects
including an update on progress and the budget position on each is provided at
Appendix One.  This has resulted in a balance of £147,092 in the Fund.  This is
substantially comprised of unrequired contingency allocations for the identified
projects and a proportion of the asset acquisition fund.  The latter allocation was part
utilised for the purchase of a car park in New Street, Stevenston and a long term
vacant property at 2 Main Street, Kilbirnie but not fully utilised due to the private sale
of a proposed further acquisition site in Stevenston which resulted in the purchase by
the Council not being progressed.   
2.5 The balance of funding therefore requires to be utilised or financially committed within
the current financial year. It is proposed that the remaining £147,092 be reallocated as
set out below.  Further details on each of the projects and the purpose of the
reallocations is provided in the Appendix One: 
‒ Dalry Play Links: £30,000 to support the delivery of the Lochshore Play Links
project in the Garnock Valley. This will see the installation of three unique play
features in Beith, Kilbirnie and Dalry which are reflective of the unique heritage
connections between each town and Lochshore. These have been designed
through co-design workshops with residents of each town. They will act as
signposts between each town and Lochshore, encouraging new visitors to
Lochshore to explore the wider area;
‒ Dalry Active Travel Improvements: £91,306 to support the upgrade of the Lover’s
Walk link to Dalry Station to improve active travel and support the B714 Upgrade
project;
‒ Stevenston Shopfronts: Additional £5,786 to support works to the Pop Inn, thereby
expending a total of £286,500 on the 100% funded Shopfront Improvement

Page 3

Scheme in Stevenston town centre. Initial scoping work and consultation identified
strategic areas of focus to address the poor condition of town centre buildings.;
and
‒ Stevenston Beach Hub: Supporting the creation of the new multi-functional
community hub located adjacent to Stevenston shore. The hub, operated by Raise
Your Voice with Ardeer (RYVA), facilitates new indoor and outdoor activities to the
benefit of local communities and promote Stevenston beach as a destination. An
additional £20,000 is being allocated to support accessibility and environmental
improvements at the Hub. 
2.6 This approach aligns with the previous Cabinet approvals and accords with and
contributes to the Regeneration Delivery Plan.  It is also proposed that delegated
authority be provided to the Executive Director (Place) to agree any further changes to
the funding allocations in consultation with the Portfolio Lead if required. 
3. Proposals 
3.1 That Cabinet: 
(a) Notes the progress made on the implementation of the Town Centre Fund
projects;
(b) Approves the proposals for the balance of the Town Centre Fund as detailed at
Appendix One; and
(c) Provides delegated authority to the Executive Director (Place) to agree further
changes to the funding allocations in consultation with the Portfolio Lead if
required. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The balance of the Town Centre Fund requires to be expended or financially
committed by 31 March 2023.  The cost of the identified projects will be met by this
allocation alongside identified match funding. 
Human Resources 
4.2 The identified projects will be delivered through the existing Regeneration Team
resource. 
Legal 
4.3 The legal implications of the projects will be considered through their development
and progress in compliance with the grant conditions. 
Equality/Socio-economic 
4.4 The identified projects will assist in meeting our socio-economic duty as set out in the
Fairer Scotland Duty. The projects and Town Centre Fund seek to reverse economic,
social and physical decline and reduce socio-economic disadvantage. They also aim
to build community wealth and tackle local deprivation through the regeneration of our
communities by maximising the potential of our land and assets.  An initial screening

Page 4

will be undertaken to establish if an Equality and Children’s Rights Impact
Assessment is required for projects on a case by case basis. 
Climate Change and Carbon 
4.5 The identified projects align with the Environmental Sustainability and Climate Change
Strategy workstreams of: Green Economy; Transport and Travel; Natural
Environment; Sustainable Operations; and Carbon Absorption. The climate change
and carbon impacts of the projects will be assessed on a case by case basis to
minimise the potential impacts in line with best practice. 
Key Priorities 
4.6 The identified projects have been informed by the priorities identified within the Local
Outcomes Improvements Plan and Locality Partnership priorities. The implementation
of the projects will contribute to achieving the Council Plan priority outcomes and will
contribute to the ambitions for: an inclusive, growing and enterprising economy; North
Ayrshire to be well-connected with effective infrastructure; and for a sustainable,
vibrant, welcoming and attractive environment. 
Community Wealth Building 
4.7 The identified projects will contribute to delivering on the ambitions on the Community
Wealth Building Strategy Land and Assets pillar. Their delivery will have a positive
impact on the Council’s ambitions, particularly across the pillars of: 
- Land and Assets: by supporting equitable land development and the
development of underutilised assets for community use.
- Procurement: through the inclusion of appropriate community benefit from
supplier clauses within projects; and by considering local supply chain
opportunities and support delivery by smaller scale and local contractors where
appropriate.
- Financial Power: by investing in localities and leveraging external national
investment into North Ayrshire. 
5. Consultation 
5.1 The proposal for the balance of the Town Centre Fund was informed by the
assessment process outlined at Section 2.3 and the Regeneration Delivery Plan. The
Regeneration Delivery Plan was the subject of extensive consultation including
workshops with Council Officers; workshops with Elected Members; reports to and
feedback from North Ayrshire Ventures Trust and the Community Wealth Building
Expert Panel; and public engagement via Consul. It was also informed by the Locality
Partnerships’ priorities and previous public consultation exercises including Charettes.   
Russell McCutcheon
Executive Director (Place)

Page 5

For further information please contact Louise Kirk, Senior Manager Regeneration, on
01294 324766. 
Background Papers
Cabinet Report – Town Centre Fund, May 2019
Cabinet Report – Town Centre Fund, December 2020

Page 6

Appendix One: Town Centre Fund Update
Project Description Current Position Current
Budget
Allocation 
Proposed
Budget
Allocation
Change
Dalry
Dalry Building
Improvement
Grants
Delivery of a 100% funded grant Building
Improvement Scheme in Dalry. Initial scoping work
and consultation identified strategic areas of focus to
address the poor condition of buildings within the
town, several of which are at key entrances and
provided a poor impression of the town centre.
Majority of works are
complete, with weather
dependant decoration to be
undertaken. Proposed
reallocation of unused
contingency.
£177,065 £159,806 -£17,259
Dalry
Streetscape
Improvements
Town centre improvement works to provide an
improved pedestrian environment further to the
opening of the Dalry bypass and a substantial
reduction in traffic numbers. 
Removal of low level railing
and relining works are
outstanding and being
progressed.
£120,883 £120,883 £0
Dalry Park
Improvements
Improvements to Dalry Public Park to enhance the
Town Centre including works to the Pavilion and
drainage improvements. 
Complete, retention
outstanding.
£255,454 £255,454 £0
Dalry Events
& Marketing
Support for town marketing and events. This
included: Christmas Lights; Hilltap Toon Launch and
a Digital Marketing Project.
Complete, no retention
required.
£16,198 £16,198 £0
Dalry Play
Links
The installation of three unique play features in Beith,
Kilbirnie and Dalry which are reflective of the unique
heritage connections between each town and
Lochshore. These have been designed through co-
design workshops with residents of each town. They
will act as signposts between each town and
Lochshore, encouraging new visitors to Lochshore to
explore the wider area. 
New project – Proposed
allocation to support delivery
of Community Play Links
project in Garnock Valley.
This additional funding will
be distributed equally
between the three towns.
N/A £30,000 £30,000
Dalry Active
Travel
Improvements 
Upgrade of the Lover’s Walk link to Dalry Station to
improve active travel and support the B714 Upgrade
project.
New project – Proposed
allocation to support active
travel improvements.
N/A £91,306 £91,306
Dalry Total  £569,600 £673,647 £104,047

Page 7

Stevenston
Stevenston
Shopfront
Improvement
Grants
A 100% funded Shopfront Improvement Scheme in
Stevenston town centre. Initial scoping work and
consultation identified strategic areas of focus to
address the poor condition of town centre buildings.
Proposed additional funding
to support further works to
local business premises Pop
Inn.
£280,714 £286,500 £5,786
Stevenston
Beach Park
Pavilion
Supporting the creation of a new multi-functional
community hub c.70m2 located adjacent to
Stevenston shore. The hub, operated by Raise Your
Voice with Ardeer (RYVA), facilitates new indoor and
outdoor activities to the benefit of local communities
and promote Stevenston beach as a destination.
Proposed additional funding
to support accessibility and
environmental
enhancements at the Hub.
£50,000 £70,000 £20,000
Stevenston
Streetscape
Improvements
Works to provide an improved pedestrian
environment, through increasing pavement widths,
environmental improvements, changes in traffic
management and funding to support purchase of
strategic site for car parking. Comprised of New
Street and Mill Dam Route Improvements.
Works complete, proposed
reallocation of contingency.
£345,276 £303,660 -£41,616
Stevenston Total £675,990 £660,160 -£15,830
Millport
Millport CARS
Project
Funding to the support ongoing CARS initiative due
to additional costs arising as a result of Covid19.
Funding allocation complete. £120,000 £119,699 -£301
Millport Total   £120,000 £119,699 -£301
Kilbirnie
Town Centre
Projects
Kilbirnie 2 Main Street: The purchase of a long-term
vacant building that was in a state of significant
disrepair and blighted Kilbirnie town centre for years
Kilbirnie Garnock St. Carpark Improvements: An
opportunity to improve visitor parking and the public
space surrounding Stoneyholm Mill.
Complete, proposed
reallocation of contingency.
£118,500 £111,022 -£7,478
Kilbirnie Total   £118,500 £111,022 -£7,478

Page 8

West Kilbride
West Kilbride
Shopfront
Improvement
Grants
Phase 1 of a 100% grant funded Shopfront
Improvement Scheme in West Kilbride. Initial scoping
work and consultation identified strategic areas of
focus to address the poor condition of buildings
within the town, several of which are at key
entrances and provide a poor initial impression. 
Phase 1 Complete and
Phase 2 underway funded
by PBIP in 2022/23.
£93,426 £93,426 £0
West Kilbride Total £93,426 £93,426 £0
Beith
Town Centre
Projects
Beith Main Street Public Realm improvements: to
improve the street as the northern gateway to the
Beith conservation area and the setting of existing
listed buildings. 
Beith Christmas Lights: Beith Town Centre Initiative
organise the annual switch on of the Christmas
Lights, the Parade and general festivities for the town
and visitors.  Additional lighting fixtures were
purchased to support the initiative.
Complete, no retention
required.
£83,731 £83,731 £0
Beith Total £83,731 £83,731 £0
Kilwinning
Town Centre
Projects
Kilwinning Bridgend Improvements: Major public
realm improvements were undertaken c.2010 to
deliver an improved streetscape. In the interim period
elements of infrastructure have failed and additional
areas were identified. These works were undertaken
to improve the longevity and impression of the
streetscape. 
Kilwinning McGavin Park Improvements: Given the
proximity to the town centre, the park was identified
as an asset that could be improved both for the local
community and to attract visitors. 
An alternative solution to
replacement setts for
Bridgend improvements is
required and being
progressed by Roads. 
McGavin Park works are
complete.
£52,950 £ 52,950 £0
Kilwinning Total £52,950 £52,950 £0

Page 9

Irvine
Town Centre
Projects
Irvine Christmas Lights: Irvine Special Events Forum
organise the annual switch on of the Christmas
Lights and general festivities for the enjoyment of the
people of the town and visitors.  To support the
activities, additional lighting fixtures were purchased.
36 Bank Street: Funding to support the development
of a feasibility study for a Town Centre living pilot
Complete, no retention
required.
£15,900 £15,900 £0
Irvine Total £15,900 £15,900 £0
Other 
Acquisitions Funding to identify the development potential and
viability of sites identified through ongoing elected
member and public engagement.
Shortlisted site sold
privately, proposed
reallocation of funds.
£135,437 £55,000 -£80,437
Valuations &
Ownership
Searches
Undertaking valuations and ownership searches on
priority sites.
Complete. £8,269 £8,269 £0
Project Officer Employment of Town Centre Officer.  Complete. £51,197 £51,197 £0
Other Total £194,903 £114,466 -£80,437 
Total
No change to overall project
total Town Centre Fund
spend. 
£1,925,000  £1,925,000  £0