NORTH AYRSHIRE COUNCIL 
24 January 2023 
Cabinet 
Title:    Revenue Budget 2022/23 : Financial Performance to 30
November 2022 
Purpose:  To advise Cabinet of the financial performance for the Council
at 30 November 2022. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) approve the earmarking of £0.023m identified at 2.5 to
meet future year commitments;
(c)  note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; 
(d)  note the current projected deficit position of KA Leisure;
and 
(e)  approve the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2022/23 were approved by Council on 2
March 2022.  The Housing Revenue Account (HRA) Revenue Budget for 2022/23 was
approved by Council on 16 February 2022. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis.  This is the third report for 2022/23 and covers the period to the end of
November 2022 (Period 8). Projections have been made to the year-end. 
1.3   At Period 8 the General Fund is forecasting a net in-year underspend of (£0.048m)
after transferring resources to/from earmarked reserves. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£0.817m),
(1.5%).

Page 2

1.5  At the end of October 2022, the Health and Social Care Partnership is projecting a
year-end underspend of (£0.077m), (0.0%), for 2022/23, an increase of £0.026m from
the previously reported position.  The Council services element is reporting a
projected overspend of £0.129m, which is a movement of £0.421m from the
previously reported underspend.  This has been offset by a projected underspend in
relation to the Health services element of (£0.206m), which is an improvement of
(£0.447m) over the same period. 
1.6 KA Leisure has indicated a projected trading deficit of £0.280m for 2022/23.  It is
anticipated that the additional financial support to KA Leisure will be drawn from
previously approved earmarked funds. 
1.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to energy costs and essential commodities, including food and
vehicle fuel, and the ongoing negotiations in relation to 2022/23 pay settlement for
teachers.  These pressures are likely to be offset in the short term by reductions
arising from the current industrial action by teacher unions. However, the full impact of
this will continue to be assessed and quantified.  The net impact of these in terms of
the utilisation of Council reserves and knock on effect on future budget gaps will
continue to be monitored and reported to Cabinet as appropriate. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2022/23.  In addition to the budget approved
on 2 March 2022, earmarked funds of £31.875m were carried forward from 2021/22
for service expenditure in 2022/23 and are reflected in the figures within the 2022/23
financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year underspend of (£0.048m), net
of transfers to/from reserves, is anticipated for the year to 31 March 2023.

Page 3

2.3 Details of the current financial projections are summarised in the following table: 
2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that included in the approved budget, as detailed in the
following table: 
Appendix
No
Annual
Budget
Projection
to  31
March 2023
Projected
Variance
for year
(Fav)/Adv
Projected
Variance @
Period 6 
(Fav)/Adv Movement Note
Service Expenditure £000's £000's £000's £000's £000's
Chief Executives 1 19,423     19,379      (44)          (49)             5            
Communities 2 172,547   170,425     (2,122)      (1,915)        (207)        (i)
Place 3 51,799     54,645      2,846       2,653         193         (ii)
Other Corporate Services 4 34,319     31,245      (3,074)      (3,030)        (44)          (iii)
Sub Total 278,088   275,694     (2,394)      (2,341)        (53)         
Health and Social Care
Partnership 8 118,871   118,871     -              -                -              2.6
Balance for Services 396,959   394,565     (2,394)      (2,341)        (53)         
Financing Charges 5 12,272     12,272      -              -                -             
Contribution to Loans Fund
Reserve 5 3,661       3,661        -              -                -             
Total Planned Expenditure 412,892   410,498     (2,394)      (2,341)        (53)         
Planned Income
Aggregate External Finance 5 (346,101)  (346,101)    -              -                -             
Council Tax 5 (62,005)    (61,960)     45           63              (18)         
Use of Earmarked Funds 5 (4,786)      (4,786)       -              -                -             
Total Planned Income (412,892)  (412,847)    45           63              (18)         
Net Expenditure/ (Income) -              (2,349)       (2,349)      (2,278)        (71)         
Carried Forward Funds -              2,301        2,301       2,278         23          
Revised Net Expenditure/(Income) -              (48)            (48)          -                (48)         
Non Domestic
Rates
Specific
Grants TOTAL AEF
Planned Income £000's £000's £000's
Approved Budget 30 September 2022 (282,462)       (37,575)         (21,259)         (341,296)      
Movements:
22/23 Pay Award (3,744)           (3,744)          
Cost of Living Award Funding (910)             (910)            
Green Growth Accelerator (26)               (26)              
Music Tuition Charging (27)               (27)              
Scottish Disability Assistance support (98)               (98)              
Revised Planned Income (287,267)       (37,575)         (21,259)         (346,101)      
General Revenue
Grant
£000's

Page 4

2.5 Commentary on Significant Movements from the Approved Budget 
The Council's overall financial forecast against the revised budget is a net breakeven
position.  Although this is consistent with the previously reported position, it includes a
number of movements at a service level.  A brief explanation of the significant
movements from the previous forecasts are outlined as follows: 
(i) Communities – underspend of (£2.122m), an increase of (£0.207m) from the
previously reported underspend. 
The movement since Period 6 is primarily related to: 
• Impact of industrial action by Teachers, (£0.278m);
• Vacancy management across services, (£0.152m); and
• Increased net income linked to school meals uptake within Facilities
Management, (£0.125m). 
These have been partly offset by: 
• Increased residential childcare and external day placements, £0.250m; and 
• Increased teacher cover projections, £0.141m. 
It is requested that the amount previously approved earmarking in relation to the
expansion of ELC provision is reduced by (£0.070m) to reflect updated cost
projections. 
Current employee cost projections will be updated for the implications of the
ongoing national teacher pay settlement negotiations and the impact of any
further industrial action as these elements are quantified. 
(ii) Place – overspend of £2.864m, an increase of £0.193m from the previously
reported overspend. 
The net movement since Period 6 is primarily related to: 
• Additional survey costs incurred in supporting the Education estate review and
additional costs for statutory compliance, £0.199m;
• Additional Streetscene costs due to the extension of seasonal worker contracts,
£0.196m;
• Revised energy inflation costs arising from street lighting and traffic signals,
£0.131m; and 
• Increased transport costs related to additional fuel consumption and SPT
contract charges, £0.093m. 
These have been partly offset by: 
• Additional income across services, (£0.154m);  
• Vacancy management across services, (£0.104m);
• Improved recyclates prices within waste disposal contracts, (£0.079m); and
• Rephased costs associated with Local Development Plan, (£0.060m).

Page 5

It is requested that a further £0.093m is earmarked to support anticipated additional
expenditure during 2023/24, including: 
• £0.050m for Local Development Plan; and
• £0.043m in relation to the Rapid Rehousing Transition Plan. 
Virements in relation to the realignment of income from other services budgets
within Roads, reflecting revised projections, have been included within Appendix 7. 
(iii) Other Corporate Items – underspend of (£3.074m), an increase of (£0.044m)
from the previously reported underspend. 
The movement since Period 6 is primarily related to additional income in relation
to the administration of grants, (£0.166m), which has been partly offset by: 
• The utilisation of corporate contingencies, £0.071m; and 
• Revised projections for Housing Benefit Overpayment Recoveries, £0.059m. 
The revised net underspend has been applied to offset the net overspend
reported within Place. 
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of November 2022 is
attached at Appendix 8.  The report highlights the key challenges and variances for
the Partnership. 
The key points for Cabinet to note are summarised below: 
• The projected outturn is a year-end underspend of (£0.077m) for 2022/23. 
• The projected underspend on the Health Services element is (£0.206m) over the
same period. This is partly offset by a projected overspend on the Council
Services element of £0.129m; 
• The main areas of risk identified include: 
 High risk areas of low volume / high-cost services areas e.g. Learning
Disability care packages, children’s residential placements and complex care
packages;
 Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this;
 Ongoing implementation costs of the Scottish Government policy directives;
 Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs;
 The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas;
 The Covid recovery process and re-mobilisation of services, including the
ability to change and improve services following learning from the Covid
response;
 The impact and implementation of the National Care Service;

Page 6

 The NHS pay award is not settled for 2022-23 and negotiations are ongoing;
 NHS pay award for 2022/23;
 The current extremely high levels of inflation;
 The review of the Care at Home service which commenced in Spring 2022;
 Supported Accommodation - funding has been included in the budget for the
new developments but the adequacy of the funding will only be known when
the final occupants are agreed;
 Fire dampener compensation – the final level of compensation has still to be
agreed and may vary from the £0.306m assumed in the current projection. 
The projected position highlights the progress towards financial balance essential to
minimise further financial risk to the Council within the context of the current debt of
£2.320m.  Proposals for the accelerated repayment of this debt during 2022/23 have
been included in the Council’s Medium Term Financial Plan.  This includes the
planned earmarking of an additional £0.834m in 2022/23 presented to Cabinet on 29
November 2022 to support this.  Further information will be presented to Cabinet
during the course of the year. 
Risks 
2.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to energy costs and essential commodities, including food and
vehicle fuel.  A total of £1.666m has been drawn down from earmarked reserves to
offset the additional inflationary pressures identified across services to 30 September
2022.  In June 2022, Cabinet agreed to earmark £1.888m from the 2021/22
underspend to address unbudgeted inflationary pressures arising from the current
cost of living crisis.  Any further increases beyond current budget provision may
impact on future service provision. 
Negotiations in relation to the 2022/23 Teachers’ pay settlement are still ongoing and
any award in excess of that agreed by local government workers may require the
utilisation of Council reserves, with a knock on effect on future budget gaps.  These
pressures are likely to be offset in the short term by reductions arising from the current
industrial action by teacher unions.  However, the full impact of further industrial action
cannot be quantified at this time.  The net risks arising from these negotiations will
continue to be monitored and reported to Cabinet as appropriate.

Page 7

Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2022/23 and an
in-year underspend of (£0.817m), (1.5%), is currently anticipated for the year to 31
March 2023.  This is summarised in the following table with further details provided in
Appendix 6. 
2.9 Commentary Significant Movements from the Revised Budget 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Employee Costs – overspend of £0.107m, a reduction of (£0.095m) from the
previously reported overspend 
The movement is primarily related to vacancy management across the service. 
(ii) Property Costs – overspend of £1.141m, an increase of £0.420m from the
previously reported overspend 
The movement is primarily related to increased expenditure on Repairs, £0.127m,
and Other Property Costs, £0.309m, which is primarily related to additional
Council Tax liabilities. 
(iii) Capital Financing Costs – underspend of (£2.068m), an increase of
(£0.065m) from the previously reported underspend 
The underspend is primarily related to reduced loan charges, reflecting rephasing
within the HRA capital programme. 
(iv) Income – underrecovery of £0.049m, a reduction of (£0.112m) from the
previously reported underrecovery
The movement is primarily related to increased recharges to other services. 
Annual
Budget
Projection to 
31 March
2023
Projected
Variance for
year
(Fav)/Adv
Previous
Variance @
Period 6       
(Fav)/Adv Movement Note
£000's £000's £000's £000's £000's
Employee Costs 5,300        5,407          107              202            (95)            (i)
Property Costs 18,857      19,998        1,141           721            420           (ii)
Supplies and Services 451          325             (126)             (135)           9             
Transport and Plant Costs 34            25              (9)                (9)               -              
Administration Costs 1,874        1,765          (109)             (111)           2             
Third Party Payments 2,550        2,748          198              230            (32)           
Transfer Payments 155          155             -                  -                 -              
Other Expenditure 368          368             -                  -                 -              
Capital Financing 24,692      22,624        (2,068)          (2,003)         (65)            (iii)
Gross Expenditure 54,281      53,415        (866)             (1,105)         239          
Income (54,281)     (54,232)       49               161            (112)          (iv)
Net Expenditure -               (817)            (817)             (944)           127

Page 8

3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(c) note the information and financial projections outlined in the report; 
(d) approve the earmarking of £0.023m identified at 2.5 to meet future year
commitments;
(c)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; 
(d) note the current projected deficit position of KA Leisure; and 
(e)  approve the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 30 November 2022 is a net underspend of
(£0.048m). 
Housing Revenue Account
The net projection for the year as at 30 November 2022 is a net underspend of
(£0.817m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None.

Page 9

5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2022/23 : Financial Performance to 30 September 2022 - Cabinet 29
November 2022

Page 10

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 193              198              5                     3%
Total for Chief Executive 193              198              5                     3%
Financial Services
Change Programme 62                62                -                      0%
Audit, Fraud, Safety & Insurance 647              656              9                     1%
Corporate Procurement 971              832              (139)                (14%) 1         
Financial Services 1,306           1,306           -                      0%
Revenues (539)             (506)             33                   (6%)
Transformation 712              722              10                   1%
Total for Financial Services 3,159           3,072           (87)                  (3%)
People & ICT
Employee Services 894              894              -                      0%
HR & Organisational Development 1,103           1,103           -                      0%
ICT 5,288           5,286           (2)                    (0%)
Business Support 1,259           1,259           -                      0%
Customer Services 3,731           3,731           -                      0%
Total for People & ICT 12,275         12,273         (2)                    (0%)
Democratic Services
Legal & Licensing 461              534              73                   16% 2         
Policy, Performance & Elections 473              459              (14)                  (3%)
Communications 463              460              (3)                    (1%)
Civil Contingencies 60                60                -                      0%
Committee Services 554              554              -                      0%
Member Services 1,327           1,339           12                   1%
Ayrshire Support Service 54                54                -                      0%
Information Governance 404              376              (28)                  (7%)
Total for Democratic Services 3,796           3,836           40                   1%
Net Total 19,423         19,379         (44)                  (0%)

Page 11

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 16,363         16,218         (145)                (1%)
Property Costs 67                68                1                     1%
Supplies and Services 3,071           3,072           1                     0%
Transport and Plant Costs 26                26                -                      0%
Administration Costs 1,335           1,349           14                   1%
Other Agencies & Bodies 1,945           1,945           -                      0%
Transfer Payments 817              817              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 23,624         23,495         (129)                (1%)
Income (4,201)          (4,116)          85                   (2%)
Net Expenditure 19,423         19,379         (44)                  (0%)

Page 12

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement : There has been a favourable movement of £0.039m since P6 primarily due to additonal vacancy
management and increased rebate income
957 (131) -14% Employee Costs - An underspend of £0.113m due to vacancy management.
- (8) Other minor variances
(139)               
Democratic Services - Legal and Licensing
Movement : There has been an adverse movement of £0.021m since P6 mainly due to reduced Licensing income.
(717) 76 -11% Income : Projected under-recovery of £0.076m due to under-recovery in Licensing income based on current and prior
year trends.
- (3) Other minor variances
73                  
Note 2

Page 13

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 19,761         19,698            (63)                  (0%) 1         
Primary Education 44,548         44,172            (376)                (1%) 2         
Secondary Education 56,130         55,963            (167)                (0%) 3         
Additional Support Needs 12,593         12,449            (144)                (1%) 4         
Education - Other 4,994           4,413              (581)                (12%) 5         
Pupil Equity Fund 5,414           5,414              -                      0%
Facilities Management 16,630         15,839            (791)                (5%) 6         
Connected Communities 12,477         12,477            -                      0% 7         
Net Total 172,547       170,425          (2,122)             (1%)
Less Proposed Carry Forwards -                   1,196              1,196             
Net Total 172,547       171,621          (926)                (1%)
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 144,797       142,590          (2,207)             (2%)
Property Costs 1,678           1,804              126                 8%
Supplies and Services 23,319         22,905            (414)                (2%)
Transport and Plant Costs 176              212                 36                   20%
Administration Costs 615              588                 (27)                  (4%)
Other Agencies & Bodies 13,302         13,410            108                 1%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 78                78                   -                      0%
Gross Expenditure 184,545       182,167          (2,378)             (1%)
Income (11,998)        (11,742)           256                 (2%)
Net Expenditure 172,547       170,425          (2,122)             (1%)

Page 14

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been a favourable movement of £0.038m compared to P6. This is mainly due to employee
vacancy management
15,186 (63) 0% Employee costs: £0.063m due to continuing recruitment gaps and vacancy management across the sector,
(63)
Note 2 Primary Education
Movement : There has been an unfavourable movement of £0.062m compared to P6. This is mainly due to revised
projections in increased PPP costs.
42,311 (482) -1%
Employee Costs : £0.482m underspend in non teaching staff costs of which £0.270m is due to a part year saving for
Dining Hall Supervisors who were appointed at the start of this academic year. The remainder is due to recruitment gaps
and vacancy management across all other categories of non teaching staff.
2,090 89 4% Supplies and Services :  £0.089m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
80 (28) -35% Third Party Payments: an underspend of £0.028m as less overtime required due to streamlined processes
(73) 45 -62% Income: under recovery of school let income due to school lets not fully operational
These figures do not include any implications from further industrial action as part of the national dispute over teachers’
salaries, nor resultant commitments emerging from any subsequent pay settlement. This information will be reflected in
future reports at the appropriate time.
(376)
Note 3 Secondary Education
Movement : There has been a favourable movement of £0.142m compared to P6. This is mainly due to continuing
recruitment gaps and vacancy management and revised projections in PPP costs.
42,711 (265) -1% Employee Costs : £0.265m underspends in non teaching staff costs due to recruitment gaps and vacancy management
across all types of staff.
13,210 83 1% Supplies and Services : £0.083m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
139 (30) -22% Third Party Payments: an underspend of £0.030m as less overtime required due to streamlined processes
(79) 45 -57% Income: under recovery of school let income due to school lets not fully operational
These figures do not include any implications from further industrial action as part of the national dispute over teachers’
salaries, nor resultant commitments emerging from any subsequent pay settlement. This information will be reflected in
future reports at the appropriate time.
(167)
Note 4 ASN
Movement: There has been an unfavourable movement of £0.173m compared to P6, mainly due to increases in both
residential (£0.164m) and day placement (£0.086m) costs as additional young persons are accessing these services. 
This is partially offset by further employee costs underspends of £0.087m due to vacancy management.
10,859 (308) -3%
Employee costs: £0.077m underspend in teaching costs and a £0.231m underspend in non teaching staff costs across all
ASN school and bases provision from recruitment gaps and vacancy management across all categories of non teaching
staff.
There is an ongoing Supporting Needs review and this is due to be completed later this calendar year.
1,010 (242) -24%
There is a projected underspend of £0.242m on external day placements as a result of the assessment process currently
in place. This enables the children to remain in mainstream establishments or in-authority ASN establishments.
499 377 76%
There is a projected overspend of £0.377m on external specialist residential placements due to the wider impact of the
pandemic on the ongoing number of children in residential education.  Currently there are 10 children in accommodation. 
Joint working is ongoing with HSCP to continually assess the care setting for these children in delivering positive
outcomes.
- 29 Other minor movements across various budget lines
(144)

Page 15

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Education Other
Movement :There has been a favourable movement of £0.137m since P6. This is mainly due to underspends in employee
costs as a result of the teachers industrial action to date, partly offset by a projected increased spend in teachers HQ
cover costs.
3,893 (334) -9% Employee costs: £0.074m underspends across central HQ staff and £0.278m underspend in relation to the 2 days
industrial action by teachers during 2022.
1,410 21 1% Third Party Payments - small overspends across various subscriptions/licences
1,677 (290) -17% Income - PPP insurance rebate £0.075m, deductions of £0.200m in excess of budget and £0.015m salaries rec'd from
capital
22 Other minor movements across various budget lines
(581)
Note 6 Facilities Management
Movement: There has been a favourable movement of £0.125m since period 6 which is primarily in relation to increased
school meal uptake.
13,873 (498) -4%
Employee Costs: Underspend of £0.042m is due to reduced commercial catering activity.  There is an underspend of
£0.205m due to the reduced uptake of school meals.  In addition, there is an underspend of £0.231m due to recruitment
issues and reduced overtime and casual costs.
1,079 103 10% Property Costs:  Overspend is primarily in relation to purchasing cleaning materials in response to Covid-19.
4,645 (772) -17%
Supplies and services: There is a saving of £0.124m in food due to reduced commercial catering.  There are further food
savings of £0.208m due to reduced school meal uptake.  In addition, there is an underspend within Early Years of
£0.397m which has arisen due to a lower attendance rate than originally anticipated.  There is also a saving of £0.062m
within tools and implements due to delayed opening of Moorpark Primary and reduced commercial catering activity. 
(3,038) 361 -12%
Income: There is an under-recovery in commercial catering income of £0.589m due to the closure of buildings and Covid-
19 restrictions.  This is offset against an over-recovery of school meal income of £0.179m and cleaning and janitorial
income of £0.049m.
A marketing campaign is being rolled out to encourage the uptake of school meals across the school estate.
15 Other minor movements
The Early years expansion is linked to specific grant funding provided by the Scottish Government.  It is proposed to
reduce the £0.467m previously earmarked by £0.070m to £0.397m.  This is to match the current projected underspend to
the earmark request. 
(791)
Note 7 Connected Communities
Movement: There has been no change since P6.
7,319 (258) -4% Employee Costs: underspends across all sectors due to vacancy management.
1,285 156 12% Supplies and Services: anticipated inflationary increase in costs.
4,875 (6) 0%
Third Party Payments: additional support of £0.280m will be required for NALL from the Council. This will come from the
use of previously earmarked funds totalling £0.365m which will be used to support the trading deficit position and the
renewal programme within NALL.
(1,460) 99 -7% Income: projected £0.165m under recovery across various sectors as income has not returned to pre covid levels, offset
by projected over recovery in Arran Outdoor of £0.030m and Harbour Arts Centre of £0.036m.
- 9 Other minor movements across various budget lines.
-

Page 16

Appendix 3
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 186              186               -                     0%
Housing and Public Protection
Building Services (2,541)          (2,541)           -                     0% 1         
Property Governance (9)                 (9)                  -                     0%
Planning Services 290              230               (60)                 (21%) 2         
Protective Services 1,460           1,360            (100)               (7%) 3         
Other Housing 3,032           2,668            (364)               (12%) 4         
Total for Housing and Public Protection 2,232           1,708            (524)               (23%)
Commercial Services
Roads 6,364           6,874            510                 8% 5         
Streetscene 4,701           4,960            259                 6% 6         
Waste Resources 9,224           9,491            267                 3% 7         
Total for Commercial Services 20,289         21,325          1,036              5%
Economic Growth and Regeneration
Economic Development 4,383           4,358            (25)                 (1%)
Growth & Investment 211              211               -                     0%
Total for Economic Growth and Regeneration 4,594           4,569            (25)                 (1%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,442           1,529            87                   6% 8         
Housing Assets & Investment (4)                 (4)                  -                     0%
Property Maintenance 3,372           3,571            199                 6% 9         
Property Running Costs 4,725           4,743            18                   0%
Energy and Sustainability 5,347           6,512            1,165              22% 10       
Internal Transport 9,616           10,506          890                 9% 11       
Total for Sustainability, Transport and Corporate
Property 24,498         26,857          2,359              10%
Net Total 51,799         54,645          2,846              5%
Transfer to Earmarked Reserves 146               146                
Net Total 51,799         54,791          2,992

Page 17

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 45,247         45,690          443                 1%
Property Costs 21,430         22,853          1,423              7%
Supplies and Services 9,804           10,152          348                 4%
Transport and Plant Costs 9,379           10,610          1,231              13%
Administration Costs 798              798               -                     0%
Other Agencies & Bodies 19,735         19,058          (677)               (3%)
Transfer Payments -                   -                    -                     0%
Other Expenditure 182              192               10                   5%
Gross Expenditure 106,575       109,353        2,778              3%
Income (54,776)        (54,708)         68                   (0%)
Net Expenditure 51,799         54,645          2,846              5%

Page 18

Appendix 3a
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since P6 however the service are currently managing significant financial
challenges.
9,164 (347) (4%) Employee costs: An underspend of £0.347m in employee costs due to vacancy management.
5,624 (918) (16%)
Supplies & Services: An underspend of £0.918m in supplies and services. This is due to an underspend in materials as
a result of a change in the composition of the works programme. This underspend is partially offset against the
reduction in income shown below.
547 69 13% Transport costs: An overspend of £0.069m in transport costs due to increased fuel and other transport costs.
2,152 792 37% Third Party Payments: An overspend in third party payments of £0.792m. This is due to an overspend of £0.750m in
payment to contractors and an overspend of £0.042m in Agency costs.
(20,153) 358 (2%) Income: There is an under recovery of income of £0.358m. This is primarily due to the delay in the door renewal,
detection equipment and kitchen programmes.
46 Other minor movements
-
Note 2 Planning Services
Movement : There has been a favourable movement of £0.060m since the last reporting period due to delays in the
Local Development Plan moving costs into 23-24.
102 (60) (59%) Supplies & Services: An underspend of £0.060m due to plans for the LDP moving costs into 23-24.
It is requested to earmark £0.050m of the Supplies & Services underspend that relates to the Local Development Plan. 
This is to cover the phasing of the LDP over the next few years.
(60)
Note 3 Protective Services
Movement : There has been a favourable movement of £0.031m since the last reporting period due to vacancies being
filled later within the service.
1,749 (100) (6%) Employee Costs: An underspend of £0.100m in staffing costs due to vacancies during the year now filled with the
exception of one position and resignations pending.
(100)
Note 4 Other Housing
Movement: There has been a favourable movement of £0.073m since period 6. This is mainly due to a decrease in
employee costs across the service, partly offset by a small decrease in income and an increase in property costs,
relating mainly to Council Tax payments.
4,466 (443) (10%) Employee Costs: Underspend due to vacancy management.
2,590 53 2%
Property Costs: £0.034m of the overspend relates to Council Tax payments. This is for backdated Council Tax from the
previous two years, which is due for temporary furnished properties while they were unoccupied for a short period of
time between tenants. Further overspend in Temporary Accommodation property rents as additional units have been in
use, which is offset by the additional income for these properties.
26 Other minor movements
It is requested to earmark £0.043m of the vacancy underspend that relates to the Rapid Rehousing Transition Plan,
which is linked to grant funding provided by the Scottish Government. This is in addition to the £0.053m RRTP funding
that was requested to be earmarked at period 6.
(364)

Page 19

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Roads
Movement: An additional £0.131m energy budget that was included in period 6 has been removed from Roads to show
the inflationary impact of the rising energy costs for operating street lighting and traffic signals. The additional budget
will be drawn down from contingency at year end.
2,458 236 10%
Supplies and Services: Overspend of £0.132m on street lighting and traffic signal electricity costs, which is due to
inflation. Further overspend of £0.104m relates mainly to coated roadstone costs, which have been adversely affected
by inflation.
2,526 (45) (2%)
Third Party Payments: Due to Covid-19 related delays in implementing the Car Parking Charges and Decriminalised
Parking Enforcement saving, the £0.125m budget allocated for the introduction will not be used. The roads
maintenance budget has been adversely affected by inflationary pressures which is reflected in the overall overspend.
There is also a small overspend of £0.050m in unavoidable contractor costs. In addition to this, there is an overspend
of £0.025m on Artificial Intelligence software costs related to Asset Management.
(3,092) 273 (9%)
Income: £0.346m under recovery of income relating to the saving for Car Parking Charges and Decriminalised Parking
Enforcement, which will not be achieved this year due to delays in the transfer of these powers. This is partly offset with
an over recovery in fees and charges in Network.
46 Other minor movements.
A budget virement for £0.788m has been included in Appendix 7. This is mainly to increase the income and related
expenditure budgets for work carried out for other Council Services.
510
Note 6 Streetscene
Movement : There has been an adverse movement of £0.037m since P6 comprised of increased payroll costs of
£0.196m offset by increased income of £0.104m and a reduction in materials of £0.047m
6,690 237 4% Employee Costs: There is an overspend of £0.237m in employee costs primarily due to extension of seasonal workers
to January 2023 £0.182m and turnover not achieved of £0.055m
129 152 118% Transport Costs: There is an overspend of £0.152m in transport costs primarily due to addtional vehicles required for
the Covid response and seasonal workers. 
(2,888) (148) 5% Income: There is an over-recovery of income due to increased internments of £0.104m and £0.036m of income from
other departments.
18 Other minor movements
259
Note 7 Waste Services
Movement : There has been a favourable movement of £0.092m since P6 due to; additional Income from Sale of
Vouchers £0.050m and reduced costs on Bulky waste £0.052m and Organic £0.027m, offset by higher costs in Trade
Effluent of £0.042m. 
4,763 826 17%
Employee Costs:  Additional temporary labour remains in place within Waste Operations as the service recovers from
the pandemic. Work to review beats taking account of post pandemic waste composition analysis and to balance the
burden of new builds is ongoing with Trade Union colleagues resulting in support arrangements being required. In
addition there is a high volume of annual leave not taken due to COVID, requiring holiday cover.
413 130 31% Supplies & Services: Overspend on Trade effluent £0.112m and Refuse containers £0.070m, offset by underspends in
Materials £0.051m
6,369 (725) (11%)
Third Party Payments:  Underspend in Payment to contractors of £0.708m largely a result of improved quality of our
recyclate streams following sustained ‘right stuff, right bin’ campaigns alongside more competitive recyclate prices
within our disposal contracts. 
201 201 100% Transport Costs: Overspend of £0.201m due to the new way of working requiring 2 additional hire vehicles plus a long
term hire. This is being reviewed in line with the post pandemic review of beats.
(2,930) (134) 5% Income: Over-recovery of income  due to the recyclates market for glass, cans, plastics and paper being favourable to
provide income rather than a cost to the council £0.121m. 
- (31) Other minor movements.
267
Note 8 Property Management and Investment
Movement : There has been no significant movement since P6
2,350 (90) (4%) Employee Costs: An underspend of £0.052m due to vacancy management.
(8,653) 119 (1%) Income: There is an under-recovery of £0.119m in fee income.
- 58 Other minor movements including payment to contractors £0.036m and supplies and services £0.020m
87

Page 20

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 9 Property Maintenance
Movement : There has been an unfavourable movement of £0.199m since P6 due to additional survey costs incurred in
supporting the Education estate review and additional costs for statutory compliance.
6,733 199 3%
Property Costs : There is an overspend of £0.144m due to external surveying works associated with supporting the
Education Estate Review.
Statutory Compliance is also reporting an overspend of £0.067m.
199
Note 10 Energy and Sustainability
Movement : There has been no movement since P6
5,374 1,160 22%
Property Costs: Due to the current energy crisis and after drawing down £0.658m from contingencies there is an
overspend in property costs of £1.160m due to increased utility cost charges.  Electricity is forecast to be £0.070m
overspent, gas £0.981m over and biomass £0.109m over.
The reported overspends are after the inclusion of budgeted inflation contingencies. The remaining overspend will be
offset against the additional inflationary provisions agreed by Council which have been reported within the Other
Corporate Items appendix.
A review is underway to confirm options available to reduce consumption across our estate further to help mitigate the
inflationary pressure. This will be considered in the context of a need for sufficient ventilation in buildings and will also
be contingent on temperatures experienced during the winter season                                                                                                                                                                
- 5 Other minor movements
1,165
Note 10 Internal Transport
Movement - There has been an unfavourable movement of £0.093m due to a £0.049m increase in fuel costs as a result
of higher usage than previously forecasted and £0.043m increase in transport provision costs as SPT contract prices
are projected to be higher than initially anticipated.
1,682 43 3% Employee Costs:  There is an overspend of £0.043m due to reduced staff turnover.
4,201 499 12% Transport Provision Costs: Projected overspend of £0.499m is largely due to direct fuel cost increases and indirect fuel
and labour cost increases through our school transport contracts.
1,823 274 15% Fuel Costs: This projected overspend of £0.274m is due to the increase in fuel prices and the legislative changes
restricting the use of rebated gas oil (or 'red diesel' as it is commonly referred to).
467 53 11% External Hires: Projected overspend of £0.053m due to additional hire vehicles as a result of increased lead time for
replacement vehicles.
1,123 50 4%
Repairs & Maintenance: Projected overspend of £0.050m in repairs and maintenance due to price increases and
maximising the life of assets due to the increased lead time for replacement vehicles and the shortage of available
rental alternatives.
- (29) Other minor movements
The reported overspends are after the inclusion of budgeted inflation contingencies. The remaining fuel price related
overspend will be offset against the additional inflationary provisions agreed by Council which have been reported within
the Other Corporate Items appendix.
890

Page 21

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,212 2,188 (24)               (1%)
SPT Concessionary Fares 286 286 -                   0%
Ayrshire Joint Valuation Board 975 932 (43)               (4%)
3,473 3,406 (67)               (2%) 1           
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 310 310 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
26,219 23,291 (2,928)          (11%) 2           
Housing Benefits 2,422           2,343           (79)               -3% 3           
34,319 31,245 (3,074)          (9%)
Less Proposed Carry Forwards 959
Net Total 34,319 31,245 (2,115) (6%)

Page 22

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
There has been movement of £0.021m from Period 6 due to a requisition refund from SPT
3,473 (67)                 -2% There is a projected underspend of £0.067m as annual requisitions confirmed at less than current budget.
(67)
Note 2 Other Corporate Items
There has been a favourable movement of £0.082m since Period 6 due to additional administration grants received
from the Scottish Government,  partly offset by the utilisation of previously approved CTR budgets to offset increased
claims.
26,219 (3,158)            -12%
The projected underspend is primarily related to the drawdown of £1.666m earmarked funds in relation to additional
contractual and non contractual energy and fuel costs reported across the services, linked to significant unbudgeted
inflationary pressures and the release of £0.552m of earmarked funds in relation to the 2022/23 pay settlement. In
addition, centrally held funds of £0.607m are not expected to be fully utilised in year, including additional Scottish
Government funding in relation to Core Curriculum Charges, changes to DHP distributions and the administration of
grants. Additional corporate income of £0.103m is anticipated in relation to the shared AVC scheme and the purchase
of additional annual leave.
These funds have been applied to offset the overspend reported within Place at Appendix 3.
(3,158)
Note 3 Housing Benefit
There has been movement of £0.059m from Period 6 due to the revised Housing Benefit overpayment recoveries.
2,422 (79)                 -3% Projected underspend of £0.079m due to the provision of Housing Benefits and overpayment recovery.
(79)

Page 23

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 12,272 12,272 - -
Contribution to Loans Fund Reserve 3,661 3,661 - -
Scottish Government Funding (346,101) (346,101) - -
Council Tax (62,005) (61,960) 45 (0%) 1
Use of Earmarked Funds (4,786) (4,786) - -
Net Total (396,959) (396,914) 45 (0%)
In year Council Tax collection performance has continued to return towards pre pandemic levels. However, net collections
for prior years is lower than anticipated at this point in the financial year.
Note 1 Council Tax
Movement: There has been a favourable movement of £0.018m since period 6. This is mainly due to increases in the
Council Tax base.

Page 24

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,300 5,407 107 2% 1
Property Costs
Responsive Repairs 5,677 6,613 936 16%
Void Repairs 3,021 3,112 91 3%
Planned and Cyclical Maintenance 4,957 4,854 (103) (2%)
Aids and Adaptions 1,648 1,648 - 0%
Other property costs 3,554 3,771 217 6%
Total for Property Costs 18,857 19,998 1,141 2
Supplies & Services 451 325 (126) (28%) 3
Transport Costs 34 25 (9) (26%)
Administration Costs 1,874 1,765 (109) (6%) 4
Third Party Payments 2,550 2,748 198 8% 5
Transfer Payments 155 155 - 0%
Other Expenditure 368 368 - 0%
Capital Financing Costs 24,692 22,624 (2,068) (8%) 6
Gross Expenditure 54,281 53,415 (866) (2%)
Income
Council House Rents (53,310) (52,967) 343 (1%)
Other Rents (326) (388) (62) 19%
Recharges (499) (679) (180) 36%
Other Income (146) (198) (52) 36%
Transfer from HRA Reserves - - - 0%
Total Income (54,281) (54,232) 49 (0%) 7
Net Expenditure - (817) (817)

Page 25

Appendix 6a
HRA
BUDGETARY CONTROL 2022/23
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2022
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
5,300 107 2%
107
Note 2
18,857 1,141 6%
1,141
Note 3
451 (126) -28%
(126)
Note 4
1,874 (109) -6%
(109)
Note 5
2,550 198 8%
198
Note 6
24,692 (2,068) -8%
(2,068)
Note 7
(54,281) 49 0%
49
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/23
£m £m £m £m £m £m
5.280 - - - (1.151) 4.129
1.500 - - - - 1.500
5.000 - - - - 5.000
1.558 - - - - 1.558
0.123 - - - - 0.123
0.781 - - 0.817 - 1.598
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.270 - - - - 0.270
15.616 - - 0.817 (1.151) 15.282
HRA reserves and balances
Supplies & Services
An underspend in supplies and services of £0.126m. This is primarily due to underspends of £0.080m in computer
equipment and £0.054m in software licences.
Administration Costs
Movement - there has been an adverse movement of £0.002m since Period 6.
Movement - an adverse movement of £0.009m since Period 6.
An underspend in administration costs of £0.109m. This is primarily due to an underspend of £0.105m in legal fees.
Property Costs
Movement - an adverse movement of £0.420m since Period 6. This is due to an increase of £0.027m in
Responsive Repairs, £0.100m in Void Repairs and £0.309m in Other Property Costs primarily due to £0.206m in
Council Tax payments and £0.041m in void rent loss, offset by a reduction of £0.016m in Planned and Cyclical
Maintenance .
An overspend in property costs of £1.141m. This is due to an overspend of £0.935m in Responsive Repairs,
partially related to construction inflation, £0.092m in Voids Repairs, and £0.217m in other property costs of which
£0.206m relates to increased Council Tax payments and £0.017m in void rent loss, offset by an underspend of
£0.103m in Planned and Cyclical Maintenance.
Third Party Payments
Movement - there has been a favourable movement of £0.032m since Period 6. This is due to a reduction of
£0.020m in Housing Asset and Investment recharges and £0.012m in ASB Tenance & Support charges.
An overspend in third party payments of £0.198m. This is due to an overspend of £0.236m in the Housing Asset
and Investment recharges partially offset by an underspend of £0.038m in the ASB & Tenancy support charges.
Capital Financing Costs
Movement - a favourable movement of £0.065m since P6 due to further rephasing of the capital programme.
There is an underspend in capital financing costs of £2.068m due to reduced loan charges. This is due to the
reduced levels of expenditure currently being experienced in the HRA Capital budget
Section
Employee costs
An overspend in employee costs of £0.107m. This is due to an increased projection in the salary uplift.
Movement - There has been a favourable movement of £0.095m since Period 6 due to vacancy management.
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works
Income
Movement - a favourable movement of £0.112m since Period 6. This is due to an an increase of £0.136m in
recharges offset by a reduction of £0.024m in other income.
An under recovery in income of £0.049m. This is due to an under recovery of £0.342m in Council House Rents
partially offset by an over recovery of £0.061m in Other Rents, £0.180m in Recharges and £0.052m in Other
Income.

Page 26

Appendix 7
1) Budget Virements
Place
Roads Network - Third Party Payments T 0.758
Roads Network - Supplies and Services T 0.030
Roads Network - Income T -0.788
0.000
Budget Management - 30 November 2022
Virement/Budget Adjustment Requests
2022/23
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m

Page 27

Official-Protect
Official-Protect 
Integration Joint Board
15th December 2022
Subject:  2022-23 – Month 7 Financial Performance
Purpose:  To provide an overview of the IJB’s financial performance as at
Month 7 (October) including an update on the estimated financial
impact of the Covid-19 response.  
Recommendation:  It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for the
financial year 2022-23 and the current overall projected year-end
underspend of £0.077m;
(b) notes the progress with delivery of agreed savings;
(c) notes the remaining financial risks for 2022-23, including the
impact of remaining Covid-19 estimates and costs; and
(d) approves the budget reduction which is detailed at paragraph
2.11. 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected expenditure
and income commitments; these have been prepared in conjunction with relevant
budget holders and services.   It should be noted that, although this report refers to
the position at the end of October, further work is undertaken following the month end
to finalise projections, therefore the projected outturn position is as current and up to
date as can practicably be reported. 
1.2 The projected outturn is a year-end underspend of £0.077m (0%) for 2022-23.  This
includes the financial impact of the recently agreed local authority pay award but
Appendix 8

Page 28

Official-Protect
Official-Protect
excludes the NHS pay award which has still to be agreed so this is still an unquantified
risk. 
1.3 From the core projections, overall, the main areas of pressure are learning disability
care packages, residential placements for children, supplementary staff in wards and
Unplanned Activities (UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
The report also includes detail of the estimated costs and potential financial impact of
the Covid-19 response. 
FINANCIAL PERFORMANCE – AT MONTH 7 
2.2 At Month 7 against the full-year budget of £282.672m there is a projected year-end
underspend of £0.077m (0%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £0.129m in social care services and a projected
underspend of £0.206m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £80.666m there is a projected overspend of £0.422m
(0.5%) which is an adverse swing of £0.092m and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£1.003m which is a favourable movement of £0.080m. 
The budgeted number of permanent placements is 778 and at month 7 there are
787 placements.  The projection assumes that the current number of placements
will continue to increase to 799 placements by the end of the year. Within the
projection there is an assumption that recent placements which do not have a
completed financial assessment (often due to the pressure to discharge from
hospital) are costed with 50% of the cases at the current average cost of a
placement and 50% at the gross or interim funded rate.  It is likely that there will
still be some cases being gross or interim funded at the year end. Their actual cost
will not be known until the FA1 financial assessment is completed and this can
impact on the final position.

Page 29

Official-Protect
Official-Protect
The level of income recovered from charging orders was under recovered in 2021-
22 but an online position is assumed at month 7 as the income received to date is
in line with the target.   
b) Care at home (in house and purchased) is projected to be £0.004m overspent
which is a favourable movement of £0.096m.  The position is made up of an
underspend in purchased care at home as providers are not always able to accept
referrals due to staffing / recruitment issues and an overspend in the in-house
service.  As there are vacant posts some of the current capacity is being met by
existing staff working additional hours and casual staff.  Bank staff are being
offered contracts and additional staff are being recruited which will replace the
need for existing staff to work additional hours.   
c) Community alarms are projected to be £0.096m underspent which is a favourable
movement of £0.010m. 
d) Reablement services are projected to be £0.182m underspent which is an adverse
movement of £0.005m due to vacancies which are being actively recruited to. 
e) Care at Home Charging Income is projected to under recover by £0.084m (no
movement) due to an ongoing shift towards personal care which is non chargeable.
This is after applying £0.076m of Covid funding. 
f) Physical Disability Care Packages (including residential and direct payments) -
projected overspend of £0.128m in community care packages, £0.170m in direct
payments and £0.262m for residential placements. This is an overall adverse
movement of £0.025m. 
g) Adaptations are projected to be online based on spend to date. 
h) Anam Cara is projected to overspend by £0.174m which is an adverse movement
of £0.019m due to an overspend on employee costs relating to covering vacancies
and sickness.   
i) Integrated Island Services is projected to be £0.126m overspent which is a
£0.009m adverse movement.  The overspend is mainly due to additional
accommodation costs for mainland staff working at Montrose House due to local
recruitment challenges and adaptation costs to Montrose following the increase to
the capacity. 
j) District Nursing is projected to overspend by £0.029m due to an overspend on
supplies. 
k) Rehab wards are projected to overspend by £0.212m (Redburn ward £0.310m
overspent and Douglas Grant £0.098m underspent), no movement from month 6. 
The overspend at Redburn is due to cover costs for vacancies as well as
supplementary staffing for patients who require one to one support. 
l) Ward 2 is projected to break even which is an adverse movement of £0.040m due
to increased drug costs.

Page 30

Official-Protect
Official-Protect
2.4 Mental Health Services     
Against the full-year budget of £87.950m there is a projected overspend of £0.740m
(0.8%) which is a favourable movement of £0.261m. This excludes any potential
variance on the Mental Health Recovery and Renewal Funding where any underspend
will be earmarked at the year-end for use in 2023-24. The main variances are: 
a) Learning Disabilities are projected to overspend by £1.330m and the main
variances are: 
• Care Packages (including residential and direct payments) - projected
overspend of £0.324m in community care packages, £0.231m in direct
payments and £0.512m for residential placements. This is an overall
favourable movement of £0.088m.  Community Learning Disability Care
packages are proving to be one of the most challenging areas to address
overspends.  The data from CM2000 will be reported back to the service to
allow them to see where care has deviated from the planned level and focus
reviews to those areas.   
• Residential Respite is projected to overspend by £0.148m  (no movement). 
The overspend reflects funding the new facility (Roslin House) to full
capacity (£0.091m) and increased energy costs (£0.057m). 
• Agency staffing is projected to overspend by £0.088m due to the use of
agency staff during the period of recruiting to full establishment. 
b) Community Mental Health services are projected to underspend by £0.601m which
is mainly due to an underspend of £0.560m in community packages (including
direct payments).   
c) The Lead Partnership for Mental Health is projecting to be £0.039m overspent
which is a favourable movement of £0.213m and the main variances are as follows: 
• A projected underspend in Adult Inpatients of £0.066m which is a favourable
movement of £0.030m.  This is mainly due to overspends in supplementary
staff, staff in redeployment and reduced bed sale income which are offset by
£0.306m of income in relation to the firestop works.
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.200m (no movement) based on current number of placements remaining
until the year end. These placements are for individuals with very specific
needs that require a higher level of security and/or care from a staff group with
a particular skill set/competence.  There are no local NHS secure facilities for
women, people with a learning disability or people with neurodevelopmental
disorder. This can necessitate an UNPACs placement with a specialist provider
which can be out-of-area.  The nature of mental health UNPACS spend is that
it is almost exclusively on medium or long term complex secure residential
placements which are very expensive so a small increase in placements can
have a high budgetary impact. Due to the complexity and risk involved,
transitions between units or levels of security can take many months.
Applications to approve a placement are made to the Associate Medical
Director for Mental Health who needs to be satisfied that the placement is
appropriate and unavoidable prior to this being agreed.

Page 31

Official-Protect
Official-Protect
• A projected overspend in MH Pharmacy of £0.100m (no movement) due to an
increase in substitute prescribing costs. 
• Learning Disability Services are projected to overspend by £0.275m which is
an adverse movement of £0.025m. This is mainly due to high usage of
supplementary staffing, cross-charging for a LD patient whose discharge has
been delayed and redeployment staffing costs. Supplementary staffing costs
relate to backfill for sickness, increase and sustained enhanced observations
and vacancies.  The enhanced observations are reviewed on a daily basis
however, due to the individuals being acutely unwell at present, this level of
enhanced observations has been maintained for a lengthy period of time.   The
projection assumes that we begin cross charging another HSCP for the
ongoing costs of the person detailed above where, despite having extensive
time to identify an alternative placement there has, as yet been no solution
identified.
• Elderly Inpatients are projected to overspend by £0.134m which is a favourable
movement of £0.030m mainly due to the reduced use of supplementary
staffing.  
• The reduction in National Insurance contributions has resulted in a part year
saving to the Lead Partnership of £0.148m which is included in the projection.
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.187m in 2022-23, further
information is included in the table below: 
The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• Adult Community Health services £0.192m
• CAMHS £0.546m
• Mental Health Admin £0.300m
• Psychiatry £0.100m
• Psychology £0.540m
• Associate Nurse Director £0.040m 
Vacancy Savings Target (£0.481m)
Projected to March 2023 £1.718m
Over/(Under) Achievement £1.237m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £36.325m there is a projected overspend of £2.501m
(6.9%) which is an adverse movement of £0.551m. The main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£2.451m which is an adverse movement of £0.459m. The main areas within this
are noted below:

Page 32

Official-Protect
Official-Protect
• Children’s residential placements are projected to overspend by £2.911m prior
to Covid funding and projected to overspend by £2.015m after £0.896m of
Covid funding.  This is an adverse movement of £0.180m.  We started 22/23
with 23 placements and there are currently 24 placements.  Of these
placements two were assumed to be discharged October and two in December
but will continue until March 2023, additionally one new place has commenced;
we are assuming all current placements are continuing until the end of the year.
• Fostering placements are projected to underspend by £0.176m (no
movement). This is based on the budget for 115 places and 110 actual
placements (of which 6 are Covid related and are funded through the Covid-19
funding) since the start of the year. Recruitment of foster carers is an active
priority for the team, both to limit the requirement for external foster placements
and reduce pressures elsewhere on the service. This is promoted through
regular targeted recruitment campaigns, community awareness raising and
daily presence on various social media platforms. Our active recruitment
strategy is gaining some interest and we are actively pursuing a number of
enquiries as a result.
• Fostering Xtra placements are projected to be on-line after applying £0.086m
of Covid funding. The projection is based on the budget for 30 placements and
29 current placements since the start of the year.
• Private Fostering placements are projected to be £0.047m underspent (no
movement) based on the budget for 17 placements and 16 current placements.
• Kinship placements are projected to underspend by £0.180m which is a
favourable movement of £0.030m and this is based on the budget for 376
places and 356 current placements.  
• Adoption placements are projected to overspend by £0.072m (no movement). 
This is based on the budget for 56 places and 67 actual placements. 
b) Children with disabilities – residential placements are projected to underspend
by £0.173m which is an adverse movement of £0.100m.  This is based on an
increased number of placements (11) which are expected to continue until the
end of the year. 
c) Residential respite – placements are projected to overspend by £0.405m which
is an adverse movement of £0.070m.  These short-term placements are used
to prevent an admission to full residential care.  There is one placement
continuing at month 7 but it is expected to cease at the end of November. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
AHP services are projected to underspend by £0.122m due to underspends in non-
employee costs. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.992rm due to a projected underspend in the
Carers Strategy funding. There is no movement since month 6. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £2.855m which is
a favourable movement of £0.522m.  The main areas of underspend are:

Page 33

Official-Protect
Official-Protect
• An over-recovery of payroll turnover of £2.072m for social care services and an
over-recovery of payroll turnover of £0.537m for health services as outlined in
the table below.
• The reduction in National Insurance contributions has resulted in a part year
saving to the Non-Lead Partnership of £0.148m and £0.150m for social care
which is included in the projection for Management and Support.
• The additional saving in LD day care employee costs of £0.130m has
transferred to the HSCP strategy code to be held as a saving for future years.
• The 2022-23 budget included a budgeted surplus on the social care side offset
by a budgeted deficit on the health side of the budget.   The net impact is neutral
but Appendix A will show this position for each element. 
The turnover targets and projected achievement for the financial year for Health and
Social Care services out with the Lead Partnership is noted below: 
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £2.759m (137% of annual target) has been
achieved to date.  The turnover achieved to date is higher than usual as the 22/23
budget included investment in various areas of staffing and these posts are not fully
recruited to yet.  The underspend in day care for older people has also been included
as payroll turnover in 2022/23 which is a change from 2021/22 when the underspend
was held to offset additional care at home costs.   
The health vacancy projection to the year-end is based on the month 7 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas. 
The main areas at month 7 are: 
• Learning Disability £0.430m
• Management and Support   £0.359m
• Community Care Service Delivery £0.427m
• Rehab and Reablement £0.298m
• Locality Services £0.266m
• Integrated Island Services £0.256m
• Community Mental Health £0.220m 
There have been no intentional plans to pause or delay recruitment and services have
actively continued to recruit; in some service areas it has proven difficult to fill posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
Social Care Health
Services
Vacancy Savings Target (2.014m) (1.183m)
Projected to March 2023 4.086m 1.720m
Over/(Under) Achievement 2.072m 0.537m

Page 34

Official-Protect
Official-Protect
2.9 LOCAL AUTHORITY PAY AWARD SHORTFALL 
The recently agreed local government pay award was not fully funded.  The total cost
of the pay award was £4.384m against the budgeted increase of £2.077m. The
additional cost of £2.307m will be partially met by additional recurring Scottish
Government funding of £1.866m and the gap of £0.441m will be an in-year overspend
with the recurring cost being factored into the 23/24 budget. 
There is also an additional cost in relation to the additional day of leave as some
frontline posts will require to be covered during this leave.  The estimated cost of this
is £0.120m. 
2.10 Savings Progress 
a) The approved 2022-23 budget included £0.683m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 7
£m
Red - 0.060
Amber 0.060 -
Green 0.623 -
Blue - 0.623
TOTAL 0.683 0.683 
b) The main area to note is that red savings of £0.060m relating to adoption
allowances will not be achieved but this is accounted for in the projected
outturn.  The review of allowances is complete, but the benefit will not be
realised until future years as the changes will apply to future cases.   
Appendix B shows the full Transformation Plan for 2022/23 which has been agreed
by the Transformation Board; the Board is in place to provide oversight and
governance to the programme of service change.   A focus of the Board is to ensure
plans are in place to deliver savings and service change, with a solution focussed
approach to bringing programmes back on track. 
Not all the service changes on the Transformation Plan have savings attached to them
but there is an expectation that they will lead to service improvements. The Plan is
critical to the ongoing sustainability and safety of service delivery and to supporting
the delivery of financial balance in future. 
Appendix C provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving.   
2.11 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis…. without
the express consent of the Integration Joint Board.”

Page 35

Official-Protect
Official-Protect
Appendix D highlights the movement in the overall budget position for the Partnership
following the initial approved budget. 
Reduction Requiring Approval:
1) Drug Tariff Reduction 2022-23  £0.320m 
2.12 NHS – Set Aside and Pan Ayrshire Services 
Lead Partnerships:
The IJB outturn position is adjusted to reflect the impact of Lead Partnership services.
The outturn for all Lead Partnership services is shared across the 3 Partnerships on
an NRAC basis; this position is currently the default pending further work to develop
a framework to report the financial position and risk sharing across the 3 Partnerships
in relation to hosted or lead service arrangements, which has been delayed by the
requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
require to be shared with North. At Month 7 the MH lead partnership is projected to
overspend by £0.039m (£0.013m NRAC share for East and £0.012m for South). The
information reported for South is the month 6 info as they do not report at month 7. 
East HSCP –the month 6 position is a projected £0.974m underspend of which
£0.360m (37%) is attributable to North.  The main variances are: 
• Primary Care and Out of Hours Services (Lead Partnership) 
There is a projected underspend of £0.824m on the Primary Care Lead Partnership
budget and is due largely to projected underspends in Primary Care, Primary
Medical Services and Dental services where staffing numbers are running at less
than establishment. The projected underspend within Dental services is largely
due to reduced staffing costs in Childsmile and within the Dental management
team, with both service areas running with vacancies. In addition, there are
reduced costs within Primary Care contracting and support, largely due to staffing
turnover, as well as projected savings in diabetic retinopathy services and East
Ayrshire Community Hospital medical and general pharmaceutical services. 
These reduced costs are partially offset by additional costs in the GP element of
Out of Hours services, as well as additional costs in the overnight nursing service.
These elements of additional cost result in a projected overspend of £0.217m, with
work ongoing to address, as far as possible, over the course of the 2022/23
financial year. Ayrshire Urgent Care Services costs related to the Covid-19
pandemic are recharged against the Local Mobilisation Plan (Community Clinical
Hub). As highlighted previously in this report, projected costs for 2022/23 require
to be reduced as far as possible, with a recovery plan, to ensure costs can be
contained within budget going forward. 
• Prison and Police Healthcare (Lead Partnership)
The £0.150m projected underspend at month 7 is largely due to net staffing
savings. Medical contracts at both Prison and Police have reduced and is
contributing to the projected underspend. These contracts have been renegotiated
with 2021/22 being the first year of the new contract for Prison and Police

Page 36

Official-Protect
Official-Protect
Custody.  A review of the prison service is being undertaken and it is anticipated
that surplus funds will go towards improving staffing levels within the prison. 
• Other Lead Services
The £0.100m projected outturn is online with budget and relates to anticipated
charges for services from Marie Curie. All three Ayrshire IJBs approved additional
funding of £0.004m on a non-recurring basis as part of their 2022/23 budgets to
increase the overall budget from the £0.088m baseline. This additional funding is
required to offset identified cost pressures and to meet service demands from 1
April this year. The non-recurring nature of the approved uplift reflects that a
service review is to be undertaken in 2022/23. 
South HSCP – projected overspend of £0.143m of which £0.053m will be allocated
to North. The overspend is mainly due to an overspend in the community store and
continence service offset by vacancies in the Family Nurse Partnership. 
Set Aside: - an approach has yet to be decided on for 22/23, which may be used as
a “shadow year” for using current year activity. This will depend on how representative
the activity is felt to be. By default, inflation will be applied to the 2021/22 budget. The
annual budget for Acute Services is £379.3m.  The directorate is overspent by £8.2m,
caused by increasing overspends on agency medical and nursing staff, together with
increasing drug expenditure. These have been required due to the level of operational
pressure being experienced, in common with many other areas in Scotland. 
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure
• High numbers of delayed discharges and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
2.13  FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2022-23
budget during the year, these include: 
• High risk areas of low volume / high-cost services areas e.g. Learning Disability
care packages, children’s residential placements and complex care packages.
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas
• The Covid recovery process and re-mobilisation of services, including the
ability to change and improve services following learning from the Covid
response
• The impact and implementation of the National Care Service.
• The NHS pay award is not settled for 2022-23 and negotiations are ongoing.

Page 37

Official-Protect
Official-Protect
• The current extremely high levels of inflation
• The review of the Care at Home service which commenced in Spring 2022
• Supported Accommodation - funding has been included in the budget for the
new developments but the adequacy of the funding will only be known when
the final occupants are agreed.
• Fire dampener compensation – the final level of compensation has still to be
agreed and may vary from the £0.306m assumed in the current projection. 
These risks will be monitored during 2022-23 and the financial impact reported
through the budget monitoring report. 
2.14 COVID-19 – FINANCE MOBILISATION PLAN IMPACT 
Summary of position 
From the outset of the pandemic the HSCP acted very swiftly to respond and
developed a mobilisation plan detailing the additional activities to support our
response, alongside the estimated financial impact.  Financial returns were submitted
to the Scottish Government on a regular basis during 2020-21 and 2021-22, on the
premise that any additional costs aligned to mobilisation plans would be fully funded. 
This process will continue during 2022-23 with returns moving from quarterly to
monthly.  Covid funding of £13.321m was carried forward from 2021-22 for use in
services delegated to the Partnership during 2022-23 and the costs outlined below will
be met from this funding. Any unused funding, based on the projected spend in the
month 6 return, will be reclaimed by the Scottish Government and redistributed to
Health Boards for Covid-related costs in non-delegated services. 
2.15 Mobilisation Plan and Funding Position 
The initial month 3 mobilisation plan cost submission was submitted in July and
estimated the costs to be £4.067m to March 2023.   The changes since month 3 are
summarised in the table below with the main area being payments to providers to
reflect the payments made to date and the extension of part of the scheme to 31st
March 2023.  The costs remain estimates as the situation continually evolves there
will be a further update submitted each month.   
The local finance mobilisation plan submission is included as Appendix E.  The main
areas of cost are summarised below: 
Service Area Initial Month 3 
Return  
£m
Month 4 
Return 
£m
Month 5
Return          
£m
Months 6
and 7
Return         
£m
Payments to Providers  1.100  1.100 1.953 2.143
PPE 0.418 0.418 0.419 0.326
Additional Staff  1.317  1.317 1.315 1.318
Loss of Income  0.246  0.246 0.246 0.210
Children & Families 0.957  0.957  0.957 1.107
Other Areas 0.029 0.029 0.015 0.015
TOTAL  4.067   4.067  4.905 5.119

Page 38

Official-Protect
Official-Protect
Based on the projected spend, it is anticipated that £8.202m will be reclaimed by
Scottish Government. IJBs have been advised by Government that a year-end
reconciliation and balancing adjustment will be carried out in the event that too much
or too little funding has been retained by IJBs. 
2.16 Provider Sustainability Payments and Care Home Occupancy Payments 
COSLA Leaders and Scottish Government have agreed an approach to supporting
the social care sector to ensure that reasonable additional costs will be met.   We have
been making payments to commissioned social care providers in line with the agreed
national principles for sustainability and remobilisation payments to social care
providers during COVID 19.  
Care Home Occupancy Payments - The Scottish Government ceased these
payments at the end of October 2021 but exceptions were made following the Omicron
outbreak and limited payments were made to eligible care homes.  Meetings are being
held with each care home to discuss ongoing sustainability and to provide support.   
Sustainability payments – the most recent guidance issued on 22nd June reduces
the scope of what providers can claim for.  The main costs that can be claimed relate
to testing and vaccination and this is extended to 31st March 2023.  The Social Care
Staff Support Fund was also extended to 31st March 2023 (previously to 30th
September 2022). 
The sustainability payments are estimated to be a significant cost in our mobilisation
plan and the timely submission and assessment of claims is key to ensuring we can
accurately estimate the financial cost and ensure the costs are reclaimed from the
Scottish Government. The breakdown of payments made in 2022-23 up to 31st
October 2022 are shown in the tables below: 
PROVIDER SUMMARY
NCHC
Care
Homes Other Total
Total Number of Providers 17 49 66
Number contacting NAC 16 11 27
Providers Supported to date 16 11 27    
OUTSTANDING CLAIMS
NCHC
Care
Homes Other Total
Total Number of Claims                         -    4 4
Value of Claims                         -    156,720  156,720 
SUPPORT PROVIDED
NCHC
Care
Homes
Other
Services TOTAL   
£ £ £
Occupancy Payments  81,650 0 81,650
Staffing 631,342 191,215 822,556

Page 39

Official-Protect
Official-Protect
PPE, Infection Control 181,778 47,994 229,772
Other 74,075 7,894 81,969
TOTAL 968,845 247,102 1,215,947 
2.17 RESERVES 
The IJB reserves position is summarised in the table below with full detail given in
Appendix F. 
The ‘free’ general fund balance of £7.248m is held as a contingency balance, this
equates to around 2.5% of the IJB budget for 2021-22 which is above the lower target
level of 2% and does demonstrate significant progress towards establishing a
contingency reserve of between 2% and 4%. 
£1.486m is held by the Council to support a further repayment of debt at the end of
2022-23 and this is not reflected in the financial projection. The Council and
Partnership are currently exploring options to clear the full debt by the end of the
current financial year. 
General Fund
Reserves 
Earmarked Reserves
Total  Debt to
NAC
Free
GF
SG
Funding
Non-SG
Funding                     
£m
HSCP 
£m £m £m £m £m £m
Opening Balance
- 1 April 2022 (2.321) 7.248 23.106 0.699 0.500 29.232 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2022-23 from
within the available resource, thereby limiting the financial risk to the funding partners. 
The estimated costs and funding in relation to the Covid-19 response also require to
be closely monitored to ensure that the IJB can plan for the impact of this and to
ensure that the IJB is in the position to re-claim funding to compensate for the
additional costs. 
3.2 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2022-
23.

Page 40

Official-Protect
Official-Protect
4. IMPLICATIONS 
Financial:  The financial implications are as outlined in the report.  
Against the full-year budget of £282.672m there is a
projected underspend of £0.077m. The report outlines the
main variances for individual services.      
Human Resources: The report highlights vacancy or turnover savings achieved
to date. Services will review any staffing establishment plans
and recruitment in line with normal practice when
implementing service change and reviews as per agreement
with the IJB, there is no intention to sustain this level of
staffing capacity reduction on a recurring or planned basis. 
Legal: None
Equality: None
Children and Young People None
Environmental &
Sustainability:
None 
Key Priorities: None
Risk Implications: Para 2.13 highlights the financial risks. 
The report falls in line with the agreed risk appetite
statement which is a low-risk appetite in respect to
adherence to standing financial instructions, financial
controls and financial statutory duties and a high-risk
appetite in relation to finance and value for money.
Community Benefits: None 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran √ 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
The IJB financial monitoring report is shared with the NHS Ayrshire and Arran Director
of Finance and North Ayrshire Council’s Head of Finance after the report has been
finalised for the IJB. 
6. CONCLUSION 
6.1 It is recommended that the IJB: 
(a)  notes the overall integrated financial performance report for the financial year
2022-23, the overall projected year-end underspend of £0.077m;
(b) notes the progress with delivery of agreed savings;
(c) notes the remaining financial risks for 2022-23;

Page 41

Official-Protect
Official-Protect
(d) approves the budget reduction which is detailed at para 2.11. 
For more information please contact: 
Paul Doak, Head of Finance and Transformation at pdoak@north-ayrshire.gov.uk or
Eleanor Currie, Principal Manager – Finance at eleanorcurrie@north-ayrshire.gov.uk

Page 42

Official-Protect
Official-Protect
2022-23 Budget Monitoring Report–Objective Summary as at 31st October 2022       Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 64,242 64,174 (68) 16,424 16,914 490 80,666 81,088 422 330 92
: Locality Services 27,764 27,473 (291) 5,250 5,350 100 33,014 32,823 (191) (203) 12
: Community Care Service Delivery 31,489 31,399 (90) 0 0 0 31,489 31,399 (90) (97) 7
: Rehabilitation and Reablement 1,849 1,846 (3) 0 0 0 1,849 1,846 (3) (7) 4
: Long Term Conditions 925 1,118 193 9,083 9,473 390 10,008 10,591 583 522 61
: Community Link Workers 184 181 (3) 0 0 0 184 181 (3) (2) (1)
: Integrated Island Services 2,031 2,157 126 2,091 2,091 0 4,122 4,248 126 117 9
MENTAL HEALTH SERVICES 30,968 31,759 791 56,982 56,931 (51) 87,950 88,690 740 1,001 (261)
: Learning Disabilities 21,482 22,812 1,330 482 482 0 21,964 23,294 1,330 1,325 5
: Community Mental Health 5,780 5,239 (541) 1,649 1,589 (60) 7,429 6,828 (601) (518) (83)
: Addictions 3,706 3,708 2 1,658 1,628 (30) 5,364 5,336 (28) (58) 30
: Lead Partnership Mental Health NHS Area Wide 0 0 0 53,193 53,232 39 53,193 53,232 39 252 (213)
CHILDREN & JUSTICE SERVICES 32,355 34,856 2,501 3,970 3,970 0 36,325 38,826 2,501 1,950 551
: Irvine, Kilwinning and Three Towns 3,082 3,124 42 0 0 0 3,082 3,124 42 7 35
: Garnock Valley, North Coast and Arran 2,106 2,077 (29) 0 0 0 2,106 2,077 (29) (33) 4
:Intervention Services 1,753 1,768 15 340 340 0 2,093 2,108 15 (19) 34
: Care Experienced Children & Young people 21,674 24,125 2,451 0 0 0 21,674 24,125 2,451 1,992 459
: Head of Service - Children & Families 1,191 1,215 24 0 0 0 1,191 1,215 24 9 15
: Justice Services 2,385 2,385 0 0 0 0 2,385 2,385 0 (3) 3
: Universal Early Years 164 162 (2) 3,195 3,195 0 3,359 3,357 (2) (3) 1
: Lead Partnership NHS Children's Services 0 0 0 435 435 0 435 435 0 0 0
CHIEF SOCIAL WORK OFFICER 2,552 1,560 (992) 0 0 0 2,552 1,560 (992) (986) (6)
PRIMARY CARE 0 0 0 49,330 49,330 0 49,330 49,330 0 0 0
ALLIED HEALTH PROFESSIONALS 0 8,801 8,679 (122) 8,801 8,679 (122) (124) 2
COVID NHS 0 0 0 806 806 0 806 806 0 0 0
MANAGEMENT AND SUPPORT COSTS 13,924 11,260 (2,664) 2,318 2,127 (191) 16,242 13,387 (2,855) (2,333) (522)
LOCAL AUTHORITY PAY AWARD SHORTFALL 0 561 561 0 0 0 0 561 561 441 120
OUTTURN ON A MANAGED BASIS 144,041 144,170 129 138,631 138,757 126 282,672 282,927 255 279 (24)
Return Hosted Over/Underspends East 0 0 0 0 (13) (13) 0 (13) (13) (82) 69
Return Hosted Over/Underspends South 0 0 0 0 (12) (12) 0 (12) (12) (78) 66
Receive Hosted Over/Underspends South 0 0 0 0 53 53 0 53 53 53 0
Receive Hosted Over/Underspends East 0 0 0 0 (360) (360) 0 (360) (360) (223) (137)
OUTTURN ON AN IJB BASIS 144,041 144,170 129 138,631 138,425 (206) 282,672 282,595 (77) (51) (26)
Over/
(Under)
Spend
Variance at
Period 6
Movement in
projected 
variance
from Period
6
TOTAL
Partnership Budget - Objective Summary
Council Health
2022/23 Budget

Page 43

Official-Protect
2022-23 Transformation Plan               Appendix B 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 7
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Children, Families and Justice
Services
SP/HSCP/20/1 Children and Young People - External
Residential Placements
Monitor and review all placements with a view to
reducing the overspend.
Amber Saving -                    -              
SP/HSCP/20/4 Adoption Allowances Montior Adoption Allowances. With a view to reduce
the overspend
Red Saving 59,535         -                    -               59,535        
SP/HSCP/20/19 Fostering - reduce external
placements.
Monitor Fostering Placements with a view to reduce
the overspend
Red Saving -                    -              
Transport review Review of costs relating to taxi utilisation and
implemenation of new electronic form.  Aim to reduce
transport budget in council.  Links in with David
Hammonds Tranformation Project.
Red Saving
Grow internal fostering capacity Review capacity of existing foster carers with a view
of increasing existing capacity
Amber Cost neutral
NACSTA4030 Fostering Short Breaks Develop an inhouse short break service to replace
the commisioned service provided by Cornerstone.
Amber Saving -                    -               -              
Mental Health and LD
Transformation of CAMHS - CAMHS
Specification
CAMHS have reviewed and updated referral
guidance to align with the CAMHS National
Specification. Some risks identified in order to
facilitate the continued changes are accommodation,
and recruitment of clinical staff.
Amber Investment     1,091,463
Transformation of CAMHS - CAMHS
Age 25
CAMHS are developing specific pathways to provide
care and support up to the age of 25 where
appropriate e.g. Eating Disorders, Neuro, Personality
Disorders, Early Psychosis.
Amber Investment       623,402
Transformation of CAMHS - CAMHS
Waiting List
Two external providers have been procured to
support Neuro waiting for assessment (Purple House
Amber Investment       311,701

Page 44

Official-Protect
Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 7
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Transformation of CAMHS - CAMHS
Psyc Waiting List
Clinical Director & Senior Manager agreed plan in
order to reduce access to Psychiatry.  In addition to
this, 3 non-medical prescribers have been trained
and are prescribing for ADHD clinics.
Amber Investment       366,707
Transformation of CAMHS - Out of
Hours Unscheduled Care
Recruitment and implementation of a new service to
provide support to children and young people on an
unscheduled basis.  CAMHS are being
commissioned by Paediatrics to deliver this service
via Scottish Government funds.
Amber Investment         86,294
Transformation of CAMHS - CAMHS
Intensive Home Treatment
Recruitment is ongoing.  Accommodation required to
house team together. Ongoing development of
policies and procedures for team in alignment with
partners agencies
Amber Investment         14,752
Transformation of CAMHS - CAMHS
Liaison
Amber Investment       129,073
Primary Care Mental Health investment Creation of a business case to deliver Mental Health
to Primary Care over the next 4 years.  Allocation of
funds will be incrementally incraesed over the
duration of the next four years.  North leading for
Ayrshire.
Green Investment       261,159
Continued review of models of care at
Woodland View
A particular focus on rehabilation models of care for
MH building on learning from Warrix Avenue. 
Development of a business case for ARBD is also
underway.  A test of change for ward 7B will be
reported through this workstream.
Amber
Implementation of MAT standards Programme of work to set up the systems required to
report on Medical Assisted Treatment standards for
Addictions.  The programme will be run on a  pan
ayrshire basis led by North.  The national direction
was for this to be led by Public Health but they have
not started any recruitment so North will take forward
in the meantime.
Green Investment
Complex Care Model - Independent
living change fund
Recruit the Intensive Support Team agreed through
this fund and monitor progress of assessments of
out of area placements.  A dynamic register should
be developed and maintained which will feed into
national data.
Amber Investment       513,000
ACORN business model Mental Health Rehabilitation service needing help to
transition to a social enterprise.  Now incoporated
within Caring for Ayrshire.
Red Saving -              -                    -                  -              
Implementation of Trakcare Patient
Management System in Community
Services
Implementation of new information recording system
for NHS to report on 18 weeks RTT.  This will include
development of new processes and transfer of data
from current system to the new one.  This will allow
for better recording of clinical activity and inform
future DCAQ work.  Adult community mental health
will go live first followed by other community teams
currently utilisating Access databases.  A Pan
Ayrshire referral management service will be set up
Green Cost neutral
Implementation of Unscheduled Care Part of the national redesign of urgent care work.
The aim of the mental health project is to deliver an
integrated system to support mental health and
wellbeing by utilising existing mental health services
and enhancing their pathways for unscheduled
mental health presentations.
Green Investment

Page 45

Official-Protect
Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 7
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Health and Community Care
TEC Solutions To appoint a temporarory 'Project Manager' post,
who will oversee the procurement and installation of
digital telecare equipment
Green Investment         50,000 -               -              
Analogue to Digital Funding received for a Project Manager to manage
the process of moving all services users from
analogue to digital technology.
Amber Investment       996,000
SP/HSCP/20/17 Care at Home - Service Review This project will incorporate the review of the care at
home job role and any implications for service as a
Amber Investment -               -              
Hospital Team Model Green
Arran Integrated Services model Continue to work towards an Integrated Hub on
Arran building on the frailty work and developing a
single point of contact for all health and social care
services. It is anticipated there will be a substantial
amount of investment required and a business case
will be developed.
Green
Primary Care Investment Fund Remodel how we deliver primary care locally,
ensuring that multi-disciplinary teams are available in
each medical practice across North Ayrshire. This
will help ensure that when needed local people will
get the right care and support they need
Green Investment
HSCP MDT - Community Health &
Care
Implement HSCP MDTs across each of the localities
to support GP practices and HSCP service
coordinate care for those with the most complex
needs. This approach will replace Older People
Local Operational Teams.’
Develop Care at Home - Minimum data
set
Scope all current recording processes for data and
look to consolidate a dataset that can be used for all
reporting needs.
Cost neutral
AHP Whole System redesign
Build on the learning from the recent AHP workforce
exercise; to better understand the distribution and
contribution of AHPs in health and care in North Ayrshire,
to support future workforce planning that maximises this
contribution for the benefit of the people of North
Amber
Interim Beds To utilise a one-off lump sum, provided by the
Scottish Government, to provide interim beds, for a
maximum of 6 weeks, for clients who will have an
onward move to permanent care.
Green

Page 46

Official-Protect
Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 7
£
Projected 
Saving 
Projected
Shortfall
22/23
£
Partnership Wide
Supported acc models - NAC housing/
Sleepover/ outreach model
Continue working with third sector providers to
implement supported accommodation models in the
Green Saving -                  -              
SDS Review Engage with all stakeholders to look at how we
encourage a more innovative and person centred
approach to SDS.  Implement an SDS Review
Learning Board to help progress. Carers Review Develop a resource release model for allocation of
funds for carers as well as implement a short break
service.
Amber Saving -                    -                  -              
Adult Complex Care Model - Call
Monitoring
Review of call monitoring system for provision of
adult community supports.  This will include
evaluation of current provision and development of  a
specification for future tender as the current contract
is due to expire.
Implementation of Eclipse information
system
Implementation of new information recording system
for social care to replace Care First.  This will include
dedvelopment of new protocols and transfer of data
from current system to the new one.
Money matters and GP Practice
Welfare Rights service
Facilitate the introduction of a money advise service
available within GP practices.
Investment         78,000
Payroll Turnover Inflation Monitor  slippage through staff turnover with a  view
to meeting the savings target.
Saving 301,201       301,201            -                                     -
Business Support Review (linked to
Care at home review)
Scope and review the remit of the business support
unit and how it could be adapted to the benefit of all
HSCP teams.
North Elderly Mental Health inpatients
(lead partnership)
Agree the spend going forward for the recurring
savings achieved through bed retraction from Ailsa.
Saving 321,000       321,000            -                                     -
HSCP  Challenge Fund - invest to save Monitoring of all projects approved through the
Challenge Fund with a focus on invest to save ideas.
Transitions Improve transition pathways from Childrens to Adult
services as well as into older adults in order to
improve outcomes for service users.
Caring for Ayrshire The focus for Caring for Ayrshire is to bring a greater
proportion of health provision into local communities.
The Caring for Ayrshire work will ensure local GP
practices are fit for purpose and have the capacity to
host multi-disciplinary teams and meet local health
and care needs.
Investment
Advocacy Strategy Refresh of Advocacy strategy with a view to
incorporating both adult and childrens services.
Cost neutral

Page 47

Official-Protect
Official-Protect 
2022-23 Savings Tracker            Appendix C 
Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 7
Saving
Delivered @
Month 7                   
£m
Projected to
Deliver during
Year                        
£m
Projected
Shortfall                
£m
Comment
1 Adoption Allowances Amber 0.060 Red                    -                  0.060                     -   Currently projecting an overspend. 
TOTAL SOCIAL CARE SAVINGS 0.060 0.000 0.060 0.000
Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 7
Saving
Delivered @
Month 7                   
£m
Projected to
Deliver during
Year                        
£m
Projected
Shortfall                
£m
Comment
2 Payroll Turnover Inflation Green 0.302 Blue 0.302                    -   Achieved
3 Elderly Mental Health inpatients (lead partnership) Green 0.321 Blue 0.321                    -                       -   Achieved
TOTAL HEALTH SAVINGS 0.623 0.623 0.000 0.000
TOTAL NORTH HSCP SAVINGS 0.683 0.623 0.060 0.000
North Ayrshire Health and Social Care Partnership
2022/23 Savings

Page 48

Official-Protect
2022-23 Budget Reconciliation               Appendix D 
COUNCIL Period  Permanent or
Temporary £'m
Initial Approved Budget     116.017
Base budget adjustments 1   (0.046)
Uploaded Budget     115.971
Resource Transfer 1 P 26.228
Software Licences transfer to IT 3 P (0.002)
Montrose Cleaning Post to Facilities
Management 3 P (0.014)
Software Licences transfer to IT 4 P (0.003)
Summer of Play Funding from Education 5 T 0.056
Insurance – transfer to corporate 6 P (0.075)
Software Licences transfer to IT 6 P (0.006)
MARAC funding 6 T 0.009
Pay Award Funding 7 P 1.866
Commercial Waste - Corporate adjustment 7 P 0.013
Roundings (0.002) 
Budget Reported at Month 7 144.041    
HEALTH Period  Permanent or
Temporary £'m
Initial Approved Budget     163.988
Resource Transfer     (26.228)
Month 10-12 Adjustments     22.401
Adjust for Non-recurring funding     (22.408)
Full Year effect of Part Year Reductions     0.128
REVISED 22-23 BUDGET     137.881
Training Grade Adj – April 1 P (0.064)
Vire No 2 - East to North CAMHS Admin 1 P 0.099
Band 2-4 SG Funding reduction 1 P (0.007)
AHP Clinical Admin Budget Transfer 2 P 0.048
Dean Funding to Partnerships 2 P 0.085
Prescribing Uplift 2 P 1.631
Prescribing Cres 2 P (0.715)
Prescribing out non schedule 5 2 P (0.429)
Scottish Huntington’s Post 3 P 0.014
Daldorch Income Shortfall 3 P 0.045
Community Store Contributions 3 P (0.006)
Iona/Lewis Patient to South 3 T (0.046)
Marie Curie contract uplift 3 P (0.004)
Trakcare/Huntington’s/ Daldorch 3 P 0.086
Staff Wellbeing Posts from OH&RD 4 P 0.193
Top Slicing Posts- Prescribing 4 P (0.071)

Page 49

Official-Protect
Official-Protect
Admin Post transferred to Medical Records 4 T (0.034)
Naloxone for Police Scotland 4 T 0.026
Dean Funding  5 P 0.095
Rx Top Slicing to Pharmacy 5 P (0.008)
Uplift DOAC (Direct Oral Anticoagulant)
Rebate 5 P 0.06
Uplift CRES to Primary Care Rebate
Scheme 5 P 0.068
Dysphagia Post  5 P (0.021)
ADP PSST Support 5 T 0.008
CAMHS Liaison Funding 5 T (0.350)
Specialist Pharmacist in Substance Misuse 6 T 0.012
BBV (Blood Borne Virus) Funding 6 T 0.242
Maternal and Infant Nutrition Allocation 6 T 0.020
Dean Funding Pay Award 6 P 0.061
GP Office 365 Upgrade 6 T (0.137)
HD200 Drug Tariff Reduction 2022-23 7 P (0.320)
Medical Pay Award 2.5% Top Up 7 T 0.170
Roundings 7   (0.001)
Budget Reported at Month 7 138.631    
COMBINED BUDGET MONTH 7 282.672

Page 50

Official-Protect
Appendix E
Mobilisation Submission – Month 7 
Covid-19 Costs - HSCP - All
Workstream Mapping £000s April May June July August September October November December January February March 2022-23 Revenue
Total
1. Public Health Scale up of Public Health Measures 0 0 0 0 0 0 0 0 0 0 0 0 0
2. Vaccinations Flu Vaccination & Covid-19 Vaccination (FVCV) 0 0 0 0 0 0 0 0 0 0 0 0 0
3. Workforce and Capacity Additional Community Hospital Bed Capacity 0 0 0 0 0 0 0 0 0 0 0 0 0
3. Workforce and Capacity Additional Staff Costs (Contracted staff) (17) 0 0 0 0 0 0 0 0 0 0 0 (17)
3. Workforce and Capacity Additional Staff Costs (Non-contracted staff) 92 93 93 109 109 109 109 109 109 109 109 109 1,260
4. PPE, Equipment and IPC Additional Equipment and Maintenance 0 0 0 0 0 0 0 0 0 0 0 0 0
4. PPE, Equipment and IPC Additional Infection Prevention and Control Costs 45 45 45 32 32 20 18 18 18 18 18 18 326
4. PPE, Equipment and IPC Additional PPE 0 0 0 0 0 0 0 0 0 0 0 0 0
4. PPE, Equipment and IPC PPE Hub Running Costs 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Additional Capacity in Community 21 9 10 (13) 0 (27) 0 0 0 0 0 0 0
5. Social Care and Community Capacity Additional Care Home Placements 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Adult Social Care 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Children and Family Services 188 79 79 68 68 139 81 81 81 81 81 81 1,107
5. Social Care and Community Capacity Homelessness and Criminal Justice Services 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Reducing Delayed Discharge 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Covid-19 Financial Support for Adult Social Care Providers 291 291 291 243 243 459 55 55 54 54 54 54 2,143
5. Social Care and Community Capacity Social Care Support Fund Claims 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Chief Social Work Officer 0 0 0 0 0 0 0 0 0 0 0 0 0
6. Primary Care Additional FHS Contractor Costs 13 13 13 12 12 12 0 0 0 0 0 0 75
6. Primary Care Primary Care 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Digital & IT costs 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Loss of Income 47 41 41 41 41 43 (29) 0 0 0 0 0 225
7. Miscellaneous Other 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Payments to Third Parties 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Staff Wellbeing 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Patient Transport 0 0 0 0 0 0 0 0 0 0 0 0 0
680 571 572 492 504 755 234 263 262 262 262 262 5,119Total Covid Costs - HSCP - All

Page 51

Official-Protect
Appendix F 
Reserves Position in Detail 
Earmarked Funds  
: Alcohol & Drug Partnership 890
: Mental Health Action 15 511
: Primary Care Improvement Fund 1,856
: 21-22 Budget Gap 0
: Challenge Fund 500
: Community Living Change Fund 513
: Covid19 Funding 13,321
: Neighbourhood Networks 145
: Mental Health Officer Development Grant 41
: NAC Recovery and Renewal – Mental Health
Element
71
: Joint Equipment 5
: Nethermains Adaptations 40
: Supported Accommodation 50
: Care at Home Capacity 1,192
: Interim Care 1,046
: Trauma Training 50
: Trauma Trainer 48
: Family Wellbeing Fund 106
: Perinatal MH Nurse 65
: Unaccompanied Asylum-Seeking Children 11
: Multi-Disciplinary Teams 644
: Health Care Support Workers 144
: MH Recovery and Renewal  2,057
: Medical photography 4
: Data Sims 28
: School Nursing  56
: Buvidal 109
: AHP Winter Funding 51
: Perinatal and Infant Mental Health 86
: Cossette Funding 18
: Replacement Mattress Programme 78
: Expansion of Primary Care Estates 55
: GP Premises Improvements - tranches 1 and 2 81
: Mental Health Wellbeing in Primary Care 40
: Dental Practice Improvement 265
: Dental Winter Preparedness 128
Total Earmarked 24,305
Outstanding Debt (2,321)
Unallocated General Fund  7,248
General Fund 29,232