NORTH AYRSHIRE COUNCIL  
29 November 2022 
Cabinet
Title: Ayrshire Local Flood Risk Management Plan 
Purpose: To update Cabinet on progress and next steps in relation to the
publication of:
a) the Second Ayrshire Local Flood Risk Management Plan. 
b) the Final Progress Report on the First Ayrshire Local Flood
Risk Management Plan. 
Recommendation: It is proposed that Cabinet:
i. approves the Final Progress Report on the First Ayrshire
Local Flood Risk Management Plan, which will allow its
publication prior to the 31st of December 2022;
ii. approves the Second Ayrshire Local Flood Risk
Management Plan (North Ayrshire aspects) which will allow
its publication prior to the 31st of December 2022; and
iii. notes the potential North Ayrshire future financial
implications of delivering the actions and flood studies
contained within the Second Ayrshire Local Flood Risk
Management Plan.   
1. Executive Summary 
1.1    The Flood Risk Management (Scotland) Act 2009 sets out a framework for a new
approach to flood risk management in Scotland. The country was divided into ‘Local
Plan Districts’ (LPDs), with Ayrshire operating as a single LPD. The Act sets out a
requirement for the regular publication of a Flood Risk Management Plan as well as a
Local Flood Risk Management Plan for each LPD. Both plans can be summarised as
follows:
• The Ayrshire Flood Risk Management Plan is prepared by SEPA (Scottish
Environment Protection Agency) and identifies the flood risk in each LPD and
outlines mitigation actions;
• The Ayrshire Local Flood Risk Management Plan is prepared by the three
Ayrshire local authorities and provides further detail on the mitigation actions
identified in the Ayrshire Flood Risk Management Plan and confirms the resources
and timescales for action delivery. 
1.2 SEPA published the Second Flood Risk Management Plan for the Ayrshire Local Plan
District on the 22nd of December 2021. This plan identifies actions to reduce flood risk

Page 2

within Ayrshire over the 6-year Cycle 2 local plan period (2022-2028). 
1.3 The Second Ayrshire Local Flood Risk Management Plan was due to be published in
June 2022 however the publication deadline for all local plans was extended by
Ministerial Direction and is now the 31st of December 2022. The draft second Local
Flood Risk Management Plan is provided as an appendix to this paper. 
1.4 Details about the delivery and funding for the North Ayrshire Council-led flood studies
that are required to be included in the local plan are provided in Table 5 of Appendix 5
of this paper. There is also a description of the other North Ayrshire Council-led actions
in paragraphs 2.92 to 2.94. 
1.5 Approved Flood Protection Scheme actions currently qualify for Scottish Government
grant funding to cover 80% of eligible scheme costs. Given that the current funding
model is still under review, it has not been confirmed if any of the North Ayrshire
Council-led scheme design actions would qualify for national funding. Further progress
on these actions will not be made until funding becomes available.   
1.6 The final progress report on the First Ayrshire Local Flood Risk Management Plan is
also due to be published prior to the 31st of December 2022. The draft final progress
report is provided as an appendix. 
2. Background 
2.1 SEPA published the Second Ayrshire Flood Risk Management Plan on the 22nd of
December 2021 (the ‘2021 SEPA Plan’). This plan identifies responsible authorities’
committed actions to reduce flood risk within Ayrshire over the 6-year Cycle 2 local
plan period (2022-2028). 
2.2 Following publication of the 2021 SEPA Plan, North Ayrshire Council as lead local
authority is required to publish the Second Ayrshire Local Flood Risk Management
Plan (the ‘Second Ayrshire LFRM Plan’) by the 31st of December 2022. This date was
extended by 6 months from the original publication date by a ministerial direction
issued by the Scottish Government. 
2.3 The Second Ayrshire LFRM Plan provides further detail about the actions of the 2021
SEPA Plan and is required to consist of a ‘supplementary part’ and an ‘implementation
part’. The ‘supplementary part’ is a summary of the objectives, measures and other
information already contained in the published 2021 SEPA Plan. 
2.4 The ‘implementation part’ is required to include a description of how the measures
identified for the second local plan period (between 2022-2028) or the third local plan
period (between 2028-2034) would be delivered. 
2.5 The Second Ayrshire LFRM Plan must not be inconsistent with anything in the
published the 2021 SEPA Plan. 
2.6 The draft Second Ayrshire LFRM Plan is contained in Appendix 2. Subject to ongoing
development, an online interactive digital format of the plan may be available at a later
stage.

Page 3

2.7 Funding 
2.7.1 The 40 nationwide flood protection schemes prioritised in the first local plan period
were to receive 80% capital grant funding from a £42m per year budget over the 6-year
timescale. Due to the difference between the predicted and actual scheme costs, the
available funding was insufficient. Subsequently, the Scottish Government tasked
COSLA to review the suitability of the current funding model and to devise a future
model. This review is ongoing, which means that the funding of all of the schemes that
have been identified in the 2021 SEPA Plan have not been finalised.   
2.7.2 The planned North Ayrshire Council-led scheme design actions that are currently
awaiting funding confirmation are as follows: 
• The Fairlie (Keppenburn) Flood Protection Scheme Design; 
• The Brodick Flood Protection Scheme Design, which includes measures in
Lamlash; and 
• The Lower Irvine Flood Protection Scheme Design. 
2.7.3 Due to ongoing construction price inflation increases and pressures it is possible that
Scottish Government funding will not be available for the design of these schemes and
that further progress will be very limited until funding becomes available. 
2.7.4 Within North Ayrshire, Scottish Government funding that would cover 80% of eligible
costs has been secured for the implementation of the confirmed Millport Coastal and
Mill Burn Schemes as well as for the Upper Garnock Scheme, which is nearing
completion. 
2.7.5   Other than the design and implementation of flood protection schemes, indicative costs
for the different local authority funded actions were included in 2021 SEPA Plan and
are summarised in Table 3 of Appendix 3 of this paper. 
2.8 Actions 
2.8.1 A summary of the type, number and location of all of the actions contained with the
2021 SEPA Plan along with the delivery lead for each action type is provided in Table 4
of Appendix 4 of this paper. Table 4 also notes the different types of action along with
location by both Potentially Vulnerable Area (PVA) and the more focussed Objective
Target Area (OTA). The actions within the Ayrshire Local Plan District are led by either
North Ayrshire Council, East Ayrshire Council, South Ayrshire Council, SEPA or
Scottish Water.   
2.9 North Ayrshire Council-Led Studies 
2.9.1 Table 5 of Appendix 5 of this paper provides an indication of the North Ayrshire
Council-led studies identified in the 2021 SEPA Plan together with an indication of the
costs and programme for these studies. The costs of these studies will be met by
existing Council revenue budgets. Given the uncertainty around future costs, it is not
possible to accurately estimate the projected cost of the post 2028 (Cycle 3) studies at
this time.

Page 4

2.9.2 There are other ongoing actions that will be led by North Ayrshire Council over the 6-
year (Cycle 2) local plan period. Costs for these actions, such as ‘flood defence
maintenance’ or ‘community engagement’ are difficult to estimate but will typically be
met by current revenue budgets.   
2.9.3 There will also be area wide actions led by North Ayrshire Council to manage current
and future flooding in all locations. These actions, such as Local Authority planning
policy and emergency planning, will be funded by the relevant local authority revenue
budgets. 
2.9.4 The draft Second Ayrshire LFRM Plan is contained within Appendix 2. The content of
plan is required to be agreed by all other responsible authorities, including the three
Ayrshire local authorities, Scottish Water, SEPA and any other relevant authority with a
flood risk management function within the Ayrshire Local Plan District prior to
finalisation and publication. Cabinet approval is sought for the North Ayrshire Council-
led actions contained within the draft plan and for the publication of the final plan as
amended by the other authorities. The views of the other responsible authorities may
also require minor modifications to the draft plan.   
2.10 Final Progress Report on the First Ayrshire Local Flood Risk Management Plan 
2.10.1 It is intended to append the final report on the progress of first (Cycle 1) actions to the
finalised 2nd Ayrshire LFRM Plan. The final progress report finds that the delayed North
Ayrshire Council actions are limited to the following: 
• The Upper Garnock Flood Protection Scheme, which is currently under
construction, and is almost substantially complete; 
• The Millport Coastal Flood Protection Scheme, which has been confirmed and
is due to go to construction in 2023; 
• The Mill Burn Flood Protection Scheme, which has been confirmed and is due
to go to construction in financial year 2023/24; 
• The Fairlie (Keppenburn) Flood Protection Scheme, which has been submitted
for national prioritisation for design funding in Cycle 2 as the originally
envisaged funding sources could not be secured during Cycle 1. 
2.10.2 The majority of actions identified in the First Ayrshire Local Flood Risk Management
Plan have been delivered as planned as shown by Table 6 in Appendix 6. 
2.10.3 The draft Final Progress Report on the First Ayrshire Local Flood Risk Management
Plan is contained in Appendix 1. Cabinet approval is sought for the publication of the
finalised plan (particularly the North Ayrshire Council aspects), noting it may be
amended by the other authorities that have led or been involved in the implementation
of their specific actions, prior to publication. 
3. Proposals 
3.1 It is proposed that Cabinet:

Page 5

• approves the Final Progress Report on the First Ayrshire Local Flood Risk
Management Plan, which will allow its publication prior to the 31st of December
2022;
• approves the Second Ayrshire Local Flood Risk Management Plan (North Ayrshire
aspects) which will allow its publication prior to the 31st of December 2022; and 
• notes the potential North Ayrshire future financial implications of delivering the
actions and flood studies contained within the Second Ayrshire Local Flood Risk
Management Plan.
4. Implications/Socio-economic Duty
Financial
4.1 The funding for scheme design actions identified in the Second Local Flood Risk
Management Plan have not been confirmed by the Scottish Government and it is not
known when a decision on funding will be made. Funding for the implementation of
previous committed schemes will remain at the current 80%/20% Scottish
Government/local authority split. 
4.2 Should the funding for scheme design actions become confirmed, all the schemes
would require some degree of consultation, a relatively small amount of initial funding
would be required for scheme development and consultation costs and the bulk of the
expenditure for the construction is unlikely to be required before 2028 for any of the
schemes. 
4.3 Funding for the proposed flood studies, ‘other’ actions and area wide actions can be
met from the revenue budget the Council annually receives from Scottish Government
to deliver its statutory obligations resulting from the Flood Risk Management (Scotland)
Act 2009. 
Human Resources 
4.4 There are no human resource implications at present. Any additional human resource
requirements will be identified if commitment is made to take schemes forward and
costs will be met from within available budgets. 
Legal 
4.5 The approval of the Second Ayrshire Local Flood Risk Management Plan and the
Final Progress Report on the First Ayrshire Local Flood Risk Management Plan will
enable the Council to undertake its statutory obligations as identified in the 2009
Flood Risk Management (Scotland) Act. 
4.6 A Strategic Environmental Assessment (SEA) screening request was submitted to the
Scottish Government gateway on the 5th of October 2021. As the second LFRM Plan
will be fully consistent with the published 2021 SEPA Plan and would not propose any
additional actions, a follow-up SEA will not be undertaken. 
4.7 Similarly, the published 2021 SEPA Plan was subject to an appropriate Habitats
Regulation Assessment (HRA). As the Second LFRM Plan adds further detail to the
actions that have already been subject to an HRA, the plan will not result in any

Page 6

additional significant effects and the mitigation statements prescribed by the earlier
HRA will be included in the plan. Given this, a follow-up HRA is not required. The
acceptability of this approach has been confirmed by Nature Scot. 
Equality/Socio-economic 
4.8 National studies have identified that the impact of flooding is greater within areas of
deprivation. Where appropriate, an Equality Impact Assessment will be carried out
during the implementation Local Flood Risk Management Plan actions. 
Climate Change and Carbon 
4.9 Flood risk management forms part of the Council’s Environmental Sustainability and
Climate Change Strategy by supporting the sustainability of our communities. 
Key Priorities 
4.10 Flood mitigation and protection of our communities addresses the Council Plan key
priorities of 'protecting and enhancing the environment for future generations' and
providing ‘sustainable and effective infrastructure’. 
Community Wealth Building 
4.11 A package of community wealth building measures will be incorporated into the
construction projects if and when they are progressed, and this will be considered
further at the tender preparation stage. 
5. Consultation 
5.1 The Second Ayrshire LFRM Plan is required to address how it has responded to the
consultation responses that were received in connection with the published 2021 SEPA
Plan. SEPA has made a redacted version of the consultation responses available.
Their responses have been reviewed and will be addressed in the published plan. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Commercial Services, on
01294 324570. 
Background Papers 
0

Page 7

Flood Risk Management
(Scotland) Act 2009: 
FINAL PROGRESS REPORT
Local Flood Risk Management Plan
(2016-2022)
Ayrshire Local Plan District
Draft Document
20th October 2022.
DRAFT
Appendix 1

Page 8

Ayrshire Local Flood Risk Management Plan 2016-2022: FINAL REPORT
2
Contents
Foreword ....................................................................................................................................................................... 3
1. Background .............................................................................................................................................................. 4
2. Review of the Ayrshire Local FRM Plan ........................................................................................................ 4
3. Assessment of Progress ...................................................................................................................................... 8
4. Progress with PVA-specific Actions ............................................................................................................. 11
4.1 Noddsdale Water (Potentially Vulnerable Area 12/01) .................................................................... 12
4.2 Great Cumbrae Island (Potentially Vulnerable Area 12/02) ........................................................... 21
4.3 Largs to Stevenston (Potentially Vulnerable Area 12/03) ............................................................... 32
4.4 Upper Garnock Catchment (Potentially Vulnerable Area 12/04) ................................................. 44
4.5 Kilwinning (Potentially Vulnerable Area 12/05) ................................................................................. 53
4.6 River Irvine and Annick Water (Potentially Vulnerable Area 12/06) ......................................... 63
4.6 Irvine to Troon (Potentially Vulnerable Area 12/07) ........................................................................ 80
4.8 Isle of Arran (Potentially Vulnerable Area 12/08) .............................................................................. 93
4.9 Prestwick to Ayr (Potentially Vulnerable Area 12/09) .................................................................. 102
4.10 Pow Burn Catchment (Potentially Vulnerable Area 12/10) ...................................................... 113
4.11 River Ayr (Potentially Vulnerable Area 12/11) .............................................................................. 123
4.12 Ayr East (Potentially Vulnerable Area 12/12) ................................................................................ 132
4.13 Ayr South (Potentially Vulnerable Area 12/13) ............................................................................. 141
4.14 Cumnock and Catrine (Potentially Vulnerable Area 12/14) ...................................................... 149
4.15 Dalrymple and Patna (Potentially Vulnerable Area 12/15) ....................................................... 160
4.16 Straiton (Potentially Vulnerable Area 12/16) ................................................................................. 172
4.17 Dailly (Potentially Vulnerable Area 12/17) ...................................................................................... 180
4.18 Girvan (Potentially Vulnerable Area 12/18) .................................................................................... 187
4.19 Dalmellington (Potentially Vulnerable Area 12/19c) ................................................................... 198
4.20 Other actions ................................................................................................................................................. 207
Appendix1: Roles and Responsibilities ........................................................................................................ 208
Appendix2: Consultation and engagement ................................................................................................. 211
Appendix3: Supporting Information ............................................................................................................. 212
Appendix4: Acknowledgements ...................................................................................................................... 217
Appendix5: Glossary ............................................................................................................................................ 218
DRAFT
Appendix 1

Page 9

3
Foreword 
This Final Report for the Local Flood Risk Management Plan shows the progress made in delivering
the actions to avoid and reduce the risk of flooding, to allow us to prepare and protect ourselves and
our communities across the breadth of the local plan district.  The report also marks the completion
of Cycle 1 as we now transition into Cycle 2. 
“The impacts of flooding experienced by individuals, communities and businesses can be
devastating and long lasting. It is vital that we continue to reduce the risk of any such future events
and improve Scotland’s ability to manage and recover from any events which do occur.”
(Ayrshire Local Flood Risk Management Plan, June 2016) 
The publication of this Final Report shows that the co-ordinated and collaborative efforts of public
bodies can be brought together to deliver sustainable outcomes. 
The Final Report is published by North Ayrshire Council on behalf of a partnership comprising three
local authorities - North Ayrshire Council, East Ayrshire Council and South Ayrshire Council - as well
other authorities including Scottish Water and SEPA. 
Individuals are the first line of defence against flooding and have responsibilities to protect
themselves from flooding.  Through self-help and property level protection, awareness raising and
signing up to Floodline (www.floodlinescotland.org.uk), individuals, businesses and communities
can and have made key contributions to the delivery of the actions in the LFRMP (the ‘Plan’), which
are detailed in this Interim Report. 
Since the publication of the Plan in June 2016, public sector finances in Scotland have continued to
be under considerable pressure.  This placed an even greater responsibility on SEPA, local
authorities, Scottish Water and other responsible authorities to deliver their flood risk management
responsibilities in an effective and sustainable way.  During Cycle 1 we have also had to respond to
the challenges of the COVID-19 pandemic. 
SEPA, local authorities, Scottish Water, and other responsible authorities will continue to work
collaboratively to implement the actions set out in the 2nd planning cycle to June 2028 
DRAFT
Appendix 1

Page 10

4
1. Background 
The Final Report is a legal requirement of the Flood Risk Management (Scotland) Act 2009 (Section
38). The Final Report presents:
• an assessment of the progress made towards implementing the Ayrshire LFRMP (the ‘Plan’);
• a summary of the planned actions that were not implemented, with reasons for their non-
implementation; and
• a description of any other actions implemented since the plan was finalised that the lead authority
considers to have contributed to the achievement of the objectives. 
A copy of the Plan can be found at the follow link.
https://www.north-ayrshire.gov.uk/community-safety/flooding/flood-risk-management-plan.aspx
2. Review of the Ayrshire Local FRM Plan 
This section presents a review of the Plan including progress highlights, a statement on the
planned actions not implemented, the significant challenges faced and the next steps to be taken
forward during the 2nd planning cycle. 
Progress Highlights 
A selection of progress highlights since publication of the interim progress report in March 2019 are
noted below to give a flavor of the work being undertaken across the Ayrshire Local Plan District to
reduce flood risk.  A summary of progress against every action in the Plan is presented in Section 4. 
• The Upper Garnock Flood Protection Scheme has progressed to construction and is almost
complete;
• The River Garnock Flood Warning scheme has been completed;
• The detailed design of the Millport Coastal Flood Protection Scheme has been completed
and the construction of the scheme has been tendered;
• The prospective Upper and Lower Irvine Valley flood protection schemes were submitted
for National Prioritisation; 
• The Mill Burn Scheme has progressed to detailed design stage;
• The Ayrshire Shoreline Management Plan is completed and was adopted by both North
and South Ayrshire Councils; 
• The Girvan Flood Risk Assessment Study and Options Appraisal phase are completed.
The chosen option has been submitted for national prioritisation;
DRAFT
Appendix 1

Page 11

5
• The Troon Coastal Flood Study is ongoing and programmed to be completed in January
2023;
• The scoping phase for the Pow Burn Flood Risk Assessment has been completed and the
study is scheduled to commence in Spring 2023;
• The Meadowhead Integrated Catchment Study Options Appraisal stage was completed in
June 2021. Scottish Water are leading on detailed design for a phased approach to reduce
surface water and sewer flooding in Prestwick. Scottish Water have created a multi-agency
stakeholder group to assist the design and communication process for this project; 
• The Stevenston Point Integrated Catchment Study has been completed; 
• The Strategic Mapping and Modelling dataset for Largs, Cartineholm, Girvan, Underwood
Cumnock and the Meadowhead Catchment completed by Scottish Water;
• The Brodick and Lamlash Flood Risk Assessments and the Option Appraisal has been
completed;
• Surface Water Management Plans have been completed for Saltcoats, Ardrossan,
Stevenston & Kilwinning (SASK); Irvine, Kilmarnock, Ayr, Prestwick and Dundonald; and
• Beach nourishment actions in Ayr and Troon continue to be successful in the propagation
of natural sand dunes. 
Significant Deviations from the Plan 
The status of the planned actions is summarised in Section 3 and detailed in Sections 4 and 5.
No significant deviations from the Plan are considered to have occurred. 
Significant Challenges
Based on a review of the assessment of the progress of actions detailed in this Final Report, the
following key challenges and issues have been identified, some of which have had an impact on
the delivery of actions to manage flood risk.  Where these challenges have had an impact on the
delivery of specific actions, this impact is detailed in Sections 4 and 5.
Significant weather events
Whilst occasional flooding has occurred within the Ayrshire LPD over recent years, the area has
generally not experienced the exceptional flooding witnessed in other parts of Scotland e.g.
Ballater and the Scottish Borders.  Storms over the 2015/16 winter period, including Storm Frank,
brought some flooding to the area.  When flooding does occur, resources are directed away from
strategic planning to respond to the incident. 
DRAFT
Appendix 1

Page 12

6
COVID-19 Pandemic
The COVID pandemic has impacted the delivery of Cycle 1 actions including a requirement to
suspend flood risk management construction works as part of the national effort to minimise the
spread of the virus during the first national lockdown.  The pandemic also disrupted flood risk
management studies and flood modelling due to the transition to home working and the challenges
of effectively consulting and engaging with flood vulnerable communities.  These impacts have
resulted in higher implementation costs and programme delays.
Resources
Whilst the majority of actions have either been progressed in line or have advanced further than
set out in the Plan, the primary reason for actions not progressing as far as intended was a
challenging resource environment.  A range of resources were required to progress the actions set
out in the Plan to reduce flood risk.  These include the authorities responsible for progressing
individual actions being able to allocate sufficient funding for that purpose.
The available human resource, with the necessary skills to manage and develop solutions to
reduce flood risk, has also constrained progress.  Much of this human resource pressure has
arisen from the increased level of investment in flood risk management across Scotland and the
wider UK, leading to challenging recruitment.  This pressure is compounded by flood risk
management demanding particular technical skills.  This human resource pressure has been
observed within the authorities responsible for progressing individual actions and the engineering
consultants that these authorities seek to engage to support the development of solutions.
Technical Complexity
Developing an understanding of how flooding occurs and the most appropriate combination of
solutions to reduce flood risk is technically challenging, including the need to build complex
computer models to understand how storm events, tides, watercourse geometry, topography, land
use and climate change all interact to cause flooding.  This challenge has impacted progress on a
number of actions which has delayed progress on subsequent actions.  More appropriate technical
solutions have also been identified for a number of actions, compared to the way forward
envisaged when the Plan was prepared but these enhanced solutions, particularly in relation to
strategic mapping and modelling, have taken longer to implement.
Cyber-attack on SEPA
On 24 December 2020, SEPA was subject to a serious and complex cyber-attack, which
significantly impacted the organisation, staff, public and private partners, and the communities who
DRAFT
Appendix 1

Page 13

7
rely on SEPA’s services. Since the attack, SEPA has worked with Scottish Government, Police
Scotland, the National Cyber Security Centre (NCSC) and the Scottish Business Resilience Centre
(SBRC), to a clear recovery strategy. The incident has, however, temporarily impacted progress on
a number of actions such as new flood warnings, mapping and modelling projects and some
engagement activities. Many of these projects are still going ahead but the timescales for them
have been adjusted.
The Next Planning Cycle 
This report marks the completion of Cycle 1 and we are now transitioning into Cycle 2.  The Flood
Risk Management Plan for Cycle 2 can be accessed via the following link:
https://www2.sepa.org.uk/frmplans/documents/lpd12-ayrshire-frmp-2021.pdf 
The Cycle 2 Local Flood Risk Management Plan is scheduled to be published during December
2022.
Many of the Cycle 1 actions were to undertake studies that have led to the identification of further
actions to be implemented in Cycle 2 and beyond.  For example, a flood protection study may
recommend that a community flood action group is set up to increase resilience to flooding, or that
flood defences are constructed.
Conclusions
Overall, through partnership working, by delivering the actions set out in the Ayrshire LFRMP we
have reduced flood risk and helped to inform future actions to further reduce flood risk that will be
progressed during Cycle 2 and subsequent cycles.  Whilst the majority of actions have either been
progressed in line or have advanced further than set out in the Plan, a number of actions have not
progressed as far as intended, primarily due to a lack of resources.  Other actions have been
delayed where they have been dependent on the results from earlier studies.  Some actions have
also been superseded by a change in approach that will deliver better outputs but at a later date. 
DRAFT
Appendix 1

Page 14

8
3. Assessment of Progress 
This section sets out an assessment of the progress towards implementing the actions set out in the
Local Flood Risk Management Plan. There are actions that apply across the whole of the Ayrshire
LPD and actions that are specific to each of the 19 Potentially Vulnerable Areas (as defined under
Section 13 of the Act) in the Ayrshire LPD, which are shown below in Figure 1. 
Figure 1: The Ayrshire Local Plan District with Potentially Vulnerable Areas identified [Reproduced
from Ayrshire Local Plan District Flood Risk Management Strategy, SEPA (December 2015)]
DRAFT
Appendix 1

Page 15

9
The actions that apply to an individual PVA across the Ayrshire LPD are shown overleaf in
Figure 2. The summary of the assessment of progress is shown using the traffic light system,
where each item is marked as Red, Amber or Green (RAG) and where:
• GREEN – Action is on programme and within budget;
• AMBER – Action is behind programme and / or over budget but the key dates are
anticipated still to be met.
• RED – Action is behind programme and / or over budget with key dates unlikely to be met
and / or the outputs are unlikely to achieve what was anticipated by the Local FRM Plan.
Clarification was sought on the meaning of these definitions, see below:
• What is meant by ‘programme’?
It was agreed that this is the Local FRM Plan dates.
• What is meant by ‘key dates’?
It was agreed that this is the FRM cycle dates namely prioritisation December 2019 and end
of cycle. For SEPA actions only the end of cycle will apply.
• What is the ‘Budget’?
It was agreed that the delivery to programme was more important for this report and ‘Budget’
means the budget an organisation has set aside for this work not any rough budget proposed
in the Local FRM Plan.
• Will awareness raising actions have RAG?
Status for all generic actions is to be produced. There was a consensus that if awareness
raising was supporting an action that was Amber or Red then the awareness raising itself
would likely be Amber or Red.
Further detail on specific actions can be found in the relevant Potentially Vulnerable Area within
Section 4.
DRAFT
Appendix 1

Page 16

10 
Figure 2: Summary of progress of actions to manage flood risk in the Potentially Vulnerable Areas of the Ayrshire LDP 
Note: N/A is used where there is no formal Flood Protection Scheme of Flood Warning Scheme present; ticked boxes confirm that the action is complete or that it is
envisaged to be complete by the publication date of this final progress report. 
Potentially Vulnerable Areas by
actions
Flood
protections shem
es
/works
Natural flood
m
anagem
ent
works
New
flood
warning
Flood
protection
study
Natural flood
m
anagem
ent
study
Surface water plan
/ study
Strategic m
apping
and
m
odeling
Scottish
W
ater
Maintain
flood
protection
schem
e
Maintain
flood
warning
Flood
forecasting
Property level protection
schem
e
Com
m
unity flood
action
groups
Self help
Avareness raising
Maintanance
Em
ergency plans /
response
Planning
policies
12/01 Noddsdale Water   N/A N/A       
12/02 Great Cumbrae Island         
12/03 Largs to Stevenston           
12/04 Upper Garnock Catchment     N/A N/A      
12/05 Kilwinning     N/A N/A      
12/06 River Irvine and Annick Water              
12/07 Irvine to Troon            
12/08 Isle of Arran         
12/09 Prestwick to Ayr           
12/10 Pow Burn Catchment   N/A N/A      
12/11 River Ayr   N/A N/A      
12/12 Ayr east N/A N/A      
12/13 Ayr south  N/A N/A      
12/14 Cumnock and Catrine  N/A N/A       
12/15 Dalrymple and Patna   N/A      
12/16 Straiton N/A N/A      
12/17 Dailly N/A N/A      
12/18 Girvan          
12/19c  Dalmellington  N/A N/A      
Strategic m
apping
and
m
odeling
SEPA
DRAFT
Appendix 1

Page 17

11
4.Progress with PVA-specific Actions
This section sets out an assessment of the progress towards implementing actions that are specific
to each of the 19 Potentially Vulnerable Areas (PVAs) within the Ayrshire Local Plan District.
DRAFT
Appendix 1

Page 18

Noddsdale Water (Potentially Vulnerable Area 12/01) 12
4.1 Noddsdale Water (Potentially Vulnerable Area 12/01)
Local Plan District Local authority Main catchment
Ayrshire North Ayrshire Council Noddsdale Water
Summary of Progress for Noddsdale Water
There are approximately 30 residential properties at risk of flooding. The Annual Average Damages are
approximately £68,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/01 please
click here.
Progress has been made with the completion of the Flood Study for the Brisbane Glen Culvert, including natural
flood management options and the viability of property level protection. Largs has not been exposed to any
significant recent weather events.© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015).
Overview of actions to manage flooding in Noddsdale Water
DRAFT
Appendix 1

Page 19

Noddsdale Water (Potentially Vulnerable Area 12/01) 13
Summary of progress of actions to manage flood risk in the Noddsdale Water (PVA 12/01) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
study 
G
The Council will assess the flood
mitigation options identified by the
Largs Culvert Realignment
Feasibility Report completed in early
2016 in order to determine the
outline design work for a flood
protection scheme. 
01/01/2016-
31/12/2016
A flood study with option appraisal for
the culvert realignment was completed
in early 2016, which investigated the
feasibility of a flood protection scheme
focussing on realigning culverts in the
Brisbane Glen Road area and property
level protection.  This study also
considered the potential for natural
flood management to reduce runoff to
the small burns in the area and other
actions to select the most sustainable
combination of actions. The Cost
Benefit Ratio is around 0.43
The completed study found that the
prospective options for improving the
culverts at Brisbane Glen Road would
not be economically viable. No further
studies are planned but the culverts
shall continue to be assessed by North
Ayrshire Council for clearance and
repair works to minimise flood risk.  
N/A. 
DRAFT
Appendix 1

Page 20

Noddsdale Water (Potentially Vulnerable Area 12/01) 14
Strategic mapping
and modelling -
Section 16
assessment 
Scottish Water will undertake further
investigation and modelling in the
Largs sewer catchment to improve
knowledge and understanding of
flood risk in this area as required
under Section 16 of the Flood Risk
Management (Scotland) Act 2009.
01/01/2018-
31/12/2020
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed. The assessment
is now completed and has been
shared with the Local Authority.
N/A. 
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit
SEPA’s website.
22/12/2015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
N/A. 
DRAFT
Appendix 1

Page 21

Noddsdale Water (Potentially Vulnerable Area 12/01) 15
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public, to raise
awareness of flood risk and how
those affected can be better
01/06/2016-
22/06/2022
North Ayrshire Council raised
awareness about flood risk via a
separate action noted for this PVA.
Specific awareness raising about flood
risk matters was achieved when the
Council’s flooding team responded to
reported flood incidents, enquiries from
prospective developers & flood risk
consultants and when responding to
planning application consultations.
N/A.
DRAFT
Appendix 1

Page 22

Noddsdale Water (Potentially Vulnerable Area 12/01) 16
prepared. Further detail can be
found in the Council’s and Scottish
Flood Forum websites.
Community flood
action groups 
G
Although not part of a community
flood action group the public take an
active interest in flooding issues
within Largs and inform the
Council about debris in the
watercourse. North Ayrshire Council
will liaise with the group through
Community Council meetings and
directly to the public.
01/06/2016-
22/06/2022
North Ayrshire Council engaged with
responsible authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how those
affected can be better prepared.
N/A.
Awareness raising
G
North Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council's Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management. 
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19.
North Ayrshire Council raised
awareness about flood risk matters by
updating the Council’s website and by
supporting Local Flood Emergency
Groups. 
N/A.
DRAFT
Appendix 1

Page 23

Noddsdale Water (Potentially Vulnerable Area 12/01) 17
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
Project related public consultations
affecting Largs were carried out by
North Ayrshire Council. 
Maintenance
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
01/06/2016-
01/06/2022
North Ayrshire Council inspected trash
screens, watercourses and coastal
flood protection structures in
accordance with the published
inspection programme throughout the
1st Local Flood Risk Management Plan
cycle. 
N/A.
DRAFT
Appendix 1

Page 24

Noddsdale Water (Potentially Vulnerable Area 12/01) 18
including those which help to reduce
flood risk.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations. 
01/06/2016-
01/06/2022
North Ayrshire Council commissioned
emergency plans, aimed at Category 1
and 2 responders, for population
centres within North Ayrshire that have
a notable flood risk. These plans were
completed in September 2020. 
N/A. 
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
N/A.
DRAFT
Appendix 1

Page 25

Noddsdale Water (Potentially Vulnerable Area 12/01) 19
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach.
North Ayrshire Council completed a
Strategic Flood Risk Assessment for
DRAFT
Appendix 1

Page 26

Noddsdale Water (Potentially Vulnerable Area 12/01) 20
LDP2 in May 2018.  In addition, the
Ayrshire Shoreline Management Plan
(SMP), which prompts land use, policy
changes and further studies to allow
physical protective measures to take
place in the future was adopted by
North Ayrshire Council and South
Ayrshire Council in September 2018. 
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making.
DRAFT
Appendix 1

Page 27

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 21
4.2 Great Cumbrae Island (Potentially Vulnerable Area 12/02) 
Local Plan District  Local authority  Main catchment 
Ayrshire  North Ayrshire Council  Great Cumbrae coastal 
Summary of Progress for Great Cumbrae Island
Local studies have shown approximately 800 properties to be at risk. The Annual Average Damages are
approximately £2.2 million. Further information can be found in Ayrshire Local FRMP under PVA 12/02, please
click here. 
Key progress has been made in Millport with the confirmation of the Millport Coastal Flood Protection Scheme
and the Mill Burn Flood Protection Scheme. The Ayrshire Shoreline Management Plan was adopted by both
North and South Ayrshire Councils in September/October 2018.   
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Great Cumbrae Island 
DRAFT
Appendix 1

Page 28

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 22
Summary of progress of actions to manage flood risk in the Great Cumbrae Island (PVA
12/02) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
scheme/works 
A
Future investigations will look to
identify the most sustainable flood
mitigation option to manage coastal
flooding in Millport. The current
option includes the creation of a
breakwater with flood walls. It is
recommended that the options are
further developed, including an
assessment of property level
protection to supplement the primary
actions.
01/06/2016-
01/06/2022
North Ayrshire Council confirmed the
Millport Coastal Flood Protection
Scheme on the 10th of November
2020. The detailed design is complete
and the scheme is planned to be
implemented during the 2nd Local
Flood Risk Management Plan cycle
(2022-2028). 
The scheme is planned to be
implemented during the 2nd Local
Flood Risk Management Plan
cycle (2022-2028). 
A
It is recommended that the council
progress work on the proposed flood
protection work on the Mill Burn in
Millport. The Mill Burn Flood Risk
Assessment has provided
information along with an economic
appraisal which identifies potential
options to mitigate flooding. Initial
remedial work has helped to reduce
01/06/2016-
01/06/2022
North Ayrshire Council confirmed the
Mill Burn Flood Protection Scheme on
the 15th of June 2021. The detailed
design is underway and the scheme is
planned to be implemented during the
2nd Local Flood Risk Management
Plan cycle (2022-2028).
The scheme is planned to be
implemented during the 2nd Local
Flood Risk Management Plan
cycle (2022-2028).
DRAFT
Appendix 1

Page 29

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 23 
Flood protection
scheme/works
the level of risk in the area however
further analysis should be carried
out to establish the remaining level
of risk and the most sustainable
combination of actions to manage
this risk.
Flood protection
study 
G
A shoreline management plan is
recommended, this study is not
limited to Potentially Vulnerable
Areas but should cover the whole of
the Ayrshire coastline and any areas
beyond this which may be
influenced by changes in coastal
processes. The study should
investigate flooding and coastal
erosion, wave overtopping and the
current coastal protection offered.
The study will help to develop an
understanding of coastal issues and
identify where further work may be
required to mitigate against flooding. 
The Ayrshire Shoreline Management
Plan was completed and was adopted
by both North Ayrshire Council and
South Ayrshire Council in
September/October 2018.  
N/A. 
Strategic mapping
and modelling 
A
SEPA will update strategic surface
water mapping in some parts of this
catchment to improve understanding
of flood risk.
01/01/2016-
31/12/2016
SEPA's current Surface water hazard
maps use design rainfall estimates
based on FEH99 methodology, this
has now been superseded by FEH22
methodology. The FEH22 dataset
contains the latest science and
The national surface water
flooding modelling project will be
completed in 2023.  The outputs
from this will be used to update
SEPA maps early in cycle 2 and
will inform SEPA's flood risk
DRAFT
Appendix 1

Page 30

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 24
understanding of rainfall across
Scotland and represents a significant
change in rainfall amounts compared
to FEH99 dataset, as such it is no
longer consider appropriate to deliver
this action as originally intended.  This
action will not be taken forwards as
described. A major national update of
the surface water maps is underway
which will deliver updated surface
water flooding maps for Scotland
representing the latest scientific
understanding.  
assessments for the next flood
risk management cycle.
Maintain flood
protection
scheme* 
G
North Ayrshire Council to continue
to inspect and maintain the existing
Millport Coastal Flood defences,
which will continue to manage
flooding according to the design
standard at the time of construction. 
01/06/2016-
01/02/2022
The Millport coastal flood defence
structures were either inspected on an
annual basis throughout the 1st Local
Flood Risk Management Plan cycle
and were subject to a principal
inspection every three years or  
were inspected in accordance with the
inspection schedule published by
North Ayrshire Council. 
N/A. 
Maintain flood
warning 
Millport Seafront
flood warning area
G
SEPA will continue to maintain the
Millport Seafront flood warning area,
which is part of the Firth of Clyde
coastal flood warning scheme.
When flood events occur in an area
22/12/2015-
22/06/2022
SEPA has continued to operate the
flood warning service.
N/A. 
DRAFT
Appendix 1

Page 31

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 25
with a flood warning service, SEPA
will seek to verify and validate the
warning service. SEPA will use
feedback and post-event data to
ensure that our flood warning
service is timely and accurate.
Flood forecasting 
G
SEPA will continue to maintain the
the Millport Seafront flood warning
area, which is part of the Firth of
Clyde coastal flood warning
scheme. When flood events occur in
an area with a flood warning service,
SEPA will seek to verify and validate
the warning service.
SEPA will use feedback and post-
event data to ensure that our flood
warning service is timely and
accurate.
22/12/2015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
N/A
DRAFT
Appendix 1

Page 32

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 26
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
01/06/2016-
22/06/2022
North Ayrshire Council raised
awareness about flood risk via a
separate action noted for this PVA.
Specific awareness raising about flood
risk matters was achieved when the
Council’s flooding team responded to
reported flood incidents, enquiries from
prospective developers & flood risk
consultants and when responding to
planning application consultations.
N/A. 
DRAFT
Appendix 1

Page 33

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 27
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
North Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council's Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
North Ayrshire Council raised
awareness about flood risk matters by
updating the Council’s website and by
supporting Local Flood Emergency
Groups. 
Project related public consultations
affecting the Great Cumbrae PVA
were carried out by North Ayrshire
Council. 
N/A
DRAFT
Appendix 1

Page 34

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 28
public on large capital projects and
detailed local studies.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
01/06/2016-
01/06/2022
North Ayrshire Council inspected trash
screens, watercourses and coastal
flood protection structures in
accordance with the published
inspection programme throughout the
1st Local Flood Risk Management
Plan cycle.
N/A. 
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
01/06/2016-
01/06/2022
North Ayrshire Council commissioned
emergency plans, aimed at Category 1
and 2 responders, for population
centres within North Ayrshire that have
a notable flood risk. These plans were
completed in September 2020.
N/A.
DRAFT
Appendix 1

Page 35

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 29
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
N/A.
DRAFT
Appendix 1

Page 36

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 30
new development in areas with
medium to high likelihood of flooding
should be avoided.
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
North Ayrshire Council completed a
Strategic Flood Risk Assessment for
LDP2 in May 2018.  In addition, the
Ayrshire Shoreline Management Plan
(SMP), which prompts land use, policy
changes and further studies to allow
physical protective measures to take
place in the future was adopted by
North Ayrshire Council and South
Ayrshire Council in September 2018. 
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
DRAFT
Appendix 1

Page 37

Great Cumbrae Island (Potentially Vulnerable Area 12/02) 31
flooding are applied in local decision
making. 
DRAFT
Appendix 1

Page 38

Largs to Stevenston (Potentially Vulnerable Area 12/03) 32
4.3 Largs to Stevenston (Potentially Vulnerable Area 12/03) 
Local Plan District  Local authority  Main catchment 
Ayrshire  North Ayrshire Council  Saltcoats to Largs coastal 
Summary of Progress for Largs to Stevenston 
There are approximately 960 residential properties at risk of flooding. The Annual Average
Damages are approximately £1.2 million. Further information can be found in the Ayrshire Local FRMP under
PVA 12/03, please click here. 
Key progress has been made with the completion of the Stevenston Point ICS Study and the associated
Saltcoats, Ardrossan, Stevenston & Kilwinning (SASK) Surface Water Management Plan. The Ayrshire
Shoreline Management Plan was completed and adopted by both North and South Ayrshire Councils in
September/October 2018.   
The preferred option for the upgrade of the Keppen Burn culvert has been identified and the design of the Fairlie
Flood Protection Scheme is an action in the published Cycle 2 Flood Risk Management Plan.  
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Largs to Stevenston 
DRAFT
Appendix 1

Page 39

Largs to Stevenston (Potentially Vulnerable Area 12/03) 33
Summary of progress of actions to manage flood risk in the Largs to Stevenston (PVA
12/03) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
scheme/works 
A
North Ayrshire Council, Transport
Scotland and Network Rail are all
working in partnership on the
Keppen Burn Culvert upgrade. All
three organisations have an
approved prioritised worklist for the
next 3-5 years based on the
organisations own objectives and
funding availability. The Keppen
Burn Culvert upgrade will be
assessed by all three organisations
separately and will fit into the
already prioritised worklist.
01/06/2016-
01/06/2022
The preferred option for the Keppen
Burn Culvert upgrade has been
identified and design work is
programmed to be completed during
the 2nd Local Flood Risk Management
Plan cycle (2022-2028), depending on
the scheme qualifying for Scottish
Government capital grant funding.   
The design of the Fairlie Flood
Protection Scheme is
programmed to be completed
during the 2nd Local Flood Risk
Management Plan cycle (2022-
2028), depending on the scheme
qualifying for Scottish
Government capital grant funding.   
Flood protection
scheme/works 
G
Network Rail will carry out civil
engineering work which will reduce
flood risk to identified sections of the
rail network within this PVA,
including work to Saltcoats Coastal
Defence.
01/01/2019-
31/12/2024
Network Rail repaired Saltcoats
Coastal Defence (asset ref. CD
200/433) in 2016. The works included
the filling of voids, wall toe protection
and concrete repairs along 700m
length of wall to prevent water ingress.
N/A.  
Flood protection
study
G
A study is planned to further
investigate the river and coastal
01/06/2016-
01/06/2022
The Gogo Water Flood Risk
Assessment Update was completed in
N/A 
DRAFT
Appendix 1

Page 40

Largs to Stevenston (Potentially Vulnerable Area 12/03) 34
flood risk in Largs and if there is
significant interaction between the
two. The study will look at updating
the existing modelling on the Gogo
Water, and further investigate
enhancing and extending the
existing coastal defences.
2020, the Largs Coastal Flood Risk
Appraisal was completed in 2019 the
Ayrshire Shoreline Management Plan
was completed in 2018. A  Natural
Flood Management Study for the Gogo
Water has been completed.
Flood protection
study 
G
A shoreline management plan is
recommended, this study is not
limited to Potentially Vulnerable
Areas but should cover the whole of
the Ayrshire coastline and any areas
beyond this which may be
influenced by changes in coastal
processes. The study should
investigate flooding and coastal
erosion, wave overtopping and the
current coastal protection offered.
The study will help to develop an
understanding of coastal issues and
identify where further work may be
required to mitigate against flooding.
01/06/2016-
01/06/2022
The Ayrshire Shoreline Management
Plan was completed and was adopted
by both North Ayrshire Council and
South Ayrshire Council in
September/October 2018.  
N/A.  
Surface water
plan/study 
G
An integrated catchment study
covering the Stevenston Point
catchment will be carried out. This
study will help support the surface
water management planning
01/06/2016-
01/06/2022
The Integrated Catchment Study for
Stevenston Point has been completed.
Outputs have been shared with local
authorities to inform Surface Water
Management Plans.
N/A.
DRAFT
Appendix 1

Page 41

Largs to Stevenston (Potentially Vulnerable Area 12/03) 35
process in Kilwinning, Saltcoats,
Ardrossan and Stevenston. The
study will improve knowledge and
understanding of the interactions
between the above ground and
below ground drainage network e.g.
with the sewer network,
watercourses and the sea.
Surface water
plan/study 
North Ayrshire Council will develop
a surface water management plan
or plans to cover Kilwinning,
Saltcoats, Ardrossan and
Stevenston which set objectives for
the management of surface water
flood risk and identify the most
sustainable actions to achieve the
objectives. Scottish Water will
provide local knowledge and
understanding of the sewer network.
This includes Scottish Water
corporate data (as applicable) and
outputs of the Stevenston Point
integrated catchment study and
Section 16 modelling, to assist with
the surface water management
planning process.
01/06/2016-
01/06/2022
The Saltcoats, Ardrossan, Stevenston
& Kilwinning (SASK) Surface Water
Management Plan was completed in
2021. 
N/A. 
DRAFT
Appendix 1

Page 42

Largs to Stevenston (Potentially Vulnerable Area 12/03) 36
Strategic mapping
and modelling 
A
SEPA will seek to develop flood
mapping in the Ayr to Ardrossan
area to improve understanding of
coastal flood risk. The extent and
timing of improvements will depend
on detailed scoping and data
availability. Where this work
coincides with local authority
studies, SEPA will work
collaboratively to ensure consistent
modelling approaches are applied.
The coastal mapping and modelling
process will start in 2016, with early
work focussing on methodology
development and data collection.
Once this stage has been completed
a thorough review will be carried out
to identify the final mapping
improvements that can be made in
the area.
22/12/2015-
22/06/2022
Work completed to date includes the
production of key data sets including
extreme water levels and offshore
wave and wind conditions to support
future coastal modelling work.         
SEPA will complete a review of
coastal flood hazard mapping in
south west Scotland including in
this area. This includes identifying
where taking account of the
impact of waves on flooding from
the sea may be required. SEPA
will collect the required coastal
defence asset and other
information necessary to progress
with improved flood modelling and
mapping in the highest priority
areas taking account of wave
overtopping where required.
SEPA will look for opportunities to
progress future modelling work in
a way that best supports
improvements to SEPA’s Coastal
Flood Warning Schemes.
Expected to progress to the next
stage around the middle of cycle
2 and complete early in the
following cycle, subject to funding.         
Strategic mapping
and modelling -
Section 16
assessment 
Scottish Water will undertake further
investigation and modelling in the
Three Town sewer catchment to
improve knowledge and
01/01/2018-
31/12/2020
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed. 
N/A. 
DRAFT
Appendix 1

Page 43

Largs to Stevenston (Potentially Vulnerable Area 12/03) 37
understanding of flood risk in this
area as required under Section 16 of
the Flood Risk Management
(Scotland) Act 2009.
Maintain flood
protection
scheme* 
G
Largs Flood Protection Scheme was
constructed in 2002 and consists of
a concrete seawall from Old Fish
Quay to Gogo Water. This scheme
built to provide protection to the area
up to a 200-year flood.
The Gogo Street Flood Protection
Scheme was completed in 2013. 
01/06/2016-
01/06/2022
The Largs coastal flood defence
structures were inspected on an
annual basis throughout the 1st Local
Flood Risk Management Plan cycle
and were subject to a principal
inspection every three years.  
Other flood risk management assets
were inspected in accordance with the
inspection schedule published by
North Ayrshire Council.
N/A. 
Maintain flood
protection
scheme* 
Saltcoats Flood Protection Scheme
was constructed in 2006 and
consists of breakwaters, seawalls
and flood banks at Outer Nebbock.
This scheme provides protection to
the area up to a 200-year flood.
01/06/2016-
01/06/2022
The Saltcoats flood defences were
either inspected on an annual basis
throughout the 1st Local Flood Risk
Management Plan cycle and were
subject to a principal inspection every
three years or were inspected in
accordance with the inspection
schedule published by North Ayrshire
Council.
N/A. 
Maintain flood
warning 
Largs Fort Street,
Largs Seafront and
Saltcoats Harbour
G
SEPA will continue to maintain the
Largs Fort Street, Largs Seafront
and Saltcoats Harbour flood warning
areas, which are part of the Firth of
22/12/2015-
22/06/2022
SEPA has continued to operate the
flood warning service.
N/A. 
DRAFT
Appendix 1

Page 44

Largs to Stevenston (Potentially Vulnerable Area 12/03) 38
flood warning
areas
Clyde coastal flood warning
scheme. When flood events occur in
an area with a flood warning service,
SEPA will seek to verify and validate
the warning service. SEPA will use
feedback and post-event data to
ensure that our flood warning
service is timely and accurate.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The
service also provides information
which allows SEPA to issue flood
warnings, giving people a better
chance of reducing the impact of
flooding on their home or business.
For more information please visit
SEPA’s website.
22/12/2015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle. Options for
N/A.
DRAFT
Appendix 1

Page 45

Largs to Stevenston (Potentially Vulnerable Area 12/03) 39
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
01/04/2016-
22/06/2022
North Ayrshire Council raised
awareness about flood risk via a
separate action noted for this PVA.
Specific awareness raising about flood
risk matters was achieved when the
Council’s flooding team responded to
reported flood incidents, enquiries from
prospective developers & flood risk
consultants and when responding to
planning application consultations.
N/A. 
DRAFT
Appendix 1

Page 46

Largs to Stevenston (Potentially Vulnerable Area 12/03) 40
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
Community flood
action groups 
G
Although not part of a community
flood action group the public take an
active interest in flooding issues
within Largs and inform the
Council about debris in the
watercourse. North Ayrshire Council
will liaise with the group through
Community Council meetings and
directly to the public.
01/06/2016-
22/06/2022
North Ayrshire Council engaged with
responsible authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how those
affected can be better prepared.
N/A. 
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
01/06/2016-
01/06/2022
North Ayrshire Council inspected trash
screens, watercourses and coastal
flood protection structures in
accordance with the published
inspection programme throughout the
1st Local Flood Risk Management
Plan cycle.
N/A. 
DRAFT
Appendix 1

Page 47

Largs to Stevenston (Potentially Vulnerable Area 12/03) 41
including those which help to reduce
flood risk.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
01/06/2016-
01/06/2022
North Ayrshire Council commissioned
emergency plans, aimed at Category 1
and 2 responders, for population
centres within North Ayrshire that have
a notable flood risk. These plans were
completed in September 2020.
N/A. 
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management 
DRAFT
Appendix 1

Page 48

Largs to Stevenston (Potentially Vulnerable Area 12/03) 42
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
North Ayrshire Council completed a
Strategic Flood Risk Assessment for
LDP2 in May 2018.  In addition, the
Ayrshire Shoreline Management Plan
(SMP), which prompts land use, policy
DRAFT
Appendix 1

Page 49

Largs to Stevenston (Potentially Vulnerable Area 12/03) 43
changes and further studies to allow
physical protective measures to take
place in the future was adopted by
North Ayrshire Council and South
Ayrshire Council in September 2018. 
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making. 
DRAFT
Appendix 1

Page 50

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 44
4.4 Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 
Local Plan District  Local authority  Main catchment 
Ayrshire  North Ayrshire Council, Renfrewshire Council River Garnock Catchment 
Summary of Progress for Upper Garnock Catchment 
There are approximately 810 residential properties at risk of flooding. The Annual Average Damages are
approximately £790,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/04, please
click here. 
Key progress has been made with the Upper Garnock Flood Protection Scheme, which is under construction
and is projected to be completed by Autumn 2022. The scheme includes the creation of a dam and upstream
reservoir north of Kilbirnie and some limited flood walls throughout Glengarnock and Dalry that will protect over
200 properties and businesses in the Garnock Valley.  © Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Upper Garnock Catchment 
DRAFT
Appendix 1

Page 51

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 45
Summary of progress of actions to manage flood risk in the Upper Garnock Catchment
(PVA 12/04) 
Action Status Description Dates Progress in Delivery, including
key deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
scheme/works 
A
North Ayrshire Council are progressing
work on the proposed flood protection
scheme on the upper River Garnock. The
Outline design of the Upper Garnock
Flood Protection Scheme and notification
period completed in October 2015. A
total of five objections were received
during this period and the Council is
currently trying to resolve these
objections with the individuals before
making a decision to confirm the scheme
either with or without an unresolved
objection.
01/06/2016-
01/06/2022
North Ayrshire Council confirmed
the Upper Garnock Flood
Protection Scheme on the 2nd of
October 2018. The detailed
design was completed and
construction of the scheme began
in August 2020. Construction
work is ongoing and is due to be
completed in 2022. 
The Upper Garnock Flood
Protection Scheme is under
construction, which will be
completed in the early part of 2nd
Local Flood Risk Management Plan
cycle (2022-2028).
New flood warning
River Garnock
G
SEPA will continue with the development
and implementation of a flood warning
scheme on the River Garnock. Detail of
communities that will benefit from the
warnings will be determined during
scheme development.
22/12/2015-
31/12/2016
SEPA has continued to operate
the flood warning service since it
was completed earlier in the FRM
cycle.
N/A.
DRAFT
Appendix 1

Page 52

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 46
Natural Flood
Management
Study
G
Further investigations will be undertaken
which will focus on the potential benefits
of natural flood management, including
runoff control and sediment, to the
tributaries of the River Garnock, and how
these combined actions may reduce
flood risk on the River Garnock.
01/06/2016-
01/06/2022
The Upper Garnock Natural Flood
Management Study was
completed in 2020. 
N/A. 
Strategic mapping
and modelling 
G
Scottish Water will undertake further
investigation and modelling in the
Stevenson Point sewer catchment to
improve knowledge and understanding of
flood risk in this area as required under
Section 16 if the Flood Risk Management
(Scotland) Act 2009.
01/01/16-
31/12/2020
The Scottish Water assessment
of flood risk within the sewer
catchment has been completed.
The assessment is now completed
and has been shared with Local
Authority. 
Flood forecasting 
G
SEPA will continue with the development
and implementation of a flood warning
scheme on the River Garnock. Detail of
communities that will benefit from the
warnings will be determined during
scheme development.
22/12/2015-
22/12/2022
SEPA continues to improve the
Scottish Flood Forecasting
Service with the Met Office, with
daily Flood Guidance Statements
and regional Flood Alerts issued
as required to enable
communities and responders to
reduce the impacts of flooding.
SEPA in partnership with the Met
Office has developed a public
version of the daily Flood
Guidance Statement, the Scottish
Flood Forecast, to provide better
N/A
DRAFT
Appendix 1

Page 53

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 47
and earlier information to the
public. A beta version of this
product was launched in May
2022. It will be refined in the wake
of user feedback. A more
focussed version of the product,
producing guidance at a local
level, is planned for the next flood
risk management cycle.  Options
for developing forecasts of
surface water flooding have been
published in 2022 to help urban
areas and the transport network
improve their resilience to and
preparedness for flooding. The
development and wider roll-out of
this service is being considered
alongside the technical, resource
and communication challenges
associated with providing surface
water flooding guidance.
Self help 
G
Everyone is responsible for protecting
themselves and their property from
flooding. Property and business owners
can take simple steps to reduce damage
and disruption to their homes and
01/04/2016-
22/06/2022
North Ayrshire Council raised
awareness about flood risk via a
separate action noted for this
PVA. Specific awareness raising
about flood risk matters was
achieved when the Council’s
N/A. 
DRAFT
Appendix 1

Page 54

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 48
businesses should flooding happen. This
includes preparing a flood plan and
flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish Water
will continue to engage with responsible
Authorities and all other stakeholders,
including community groups and the
public to raise awareness of flood risk
and how those affected can be better
prepared. Further detail can be found in
the Councils and Scottish Flood Forum
websites.
flooding team responded to
reported flood incidents, enquiries
from prospective developers &
flood risk consultants and when
responding to planning application
consultations.
Awareness raising 
G
North Ayrshire Council, SEPA and
Scottish Water collectively work to raise
awareness of flood risk and how those
affected can be better prepared. Through
the continued development of flood
schemes and studies at higher risk
locations, officers from the Council's
Flood Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create and
share communication and education
resources with other responsible
authorities. These resources will include
22/12/2015-
22/06/2022
SEPA continues to work with
others to raise awareness of flood
risk and its flood warning service.
It has participated in local
activities including school /
education and community
resilience activities when able.
Some planned activities notably in
person joint events have been
limited or delayed due to Covid
19. 
North Ayrshire Council’s general
awareness raising was a
N/A
DRAFT
Appendix 1

Page 55

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 49
awareness campaigns, media and
marketing activity and promotion of
SEPA's flood forecasting and warning
services (Floodline).    Scottish Water will
provide targeted flooding
communications for Scottish Water
specific activities and raise awareness by
producing and supplying targeted
information to the public on large capital
projects and detailed local studies.
continuous activity via updates to
the Council’s website.
Supporting Local Flood
Emergency Groups was an
occasional activity in the Upper
Garnock PVA. 
Project related public
consultations affecting the Upper
Garnock PVA were carried out. 
Maintenance 
G
Local authorities have a duty to assess
watercourses and carry out clearance
and repair works where such works
would substantially reduce flood risk.
They produce schedules of clearance
and repair works and make these
available for public inspection. Scottish
Water undertake risk-based inspection,
maintenance and repair on the public
sewer network. Asset owners and
riparian landowners are responsible for
the maintenance and management of
their own assets including those which
help to reduce flood risk.
01/06/2016-
01/06/2022
North Ayrshire Council inspected
trash screens, watercourses and
coastal flood protection structures
in accordance with the published
inspection programme throughout
the 1st Local Flood Risk
Management Plan cycle.
N/A. 
Emergency
plans/response 
G
Providing an emergency response to
flooding is the responsibility of many
organisations, including local authorities,
01/06/2016-
01/06/2022
North Ayrshire Council
commissioned emergency plans,
aimed at Category 1 and 2
N/A. 
DRAFT
Appendix 1

Page 56

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 50
the emergency services and SEPA.
Effective management of an emergency
response relies on emergency plans that
are prepared under the Civil
Contingencies Act 2004 by Category 1
and 2 Responders. Scottish Water are a
Category 2 responder under the Civil
Contingencies Act 2004 and will support
regional and local resilience partnerships
as required. The emergency response by
these organisations is coordinated
through regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
responders, for population centres
within North Ayrshire that have a
notable flood risk. These plans
were completed in September
2020.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice Notes set
out Scottish Ministers’ priorities for the
operation of the planning system and for
the development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land management
in our rural areas, and to address the
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the
delivery of sustainable flood risk
management and we support the
delivery of FRM Plans and Local
FRM Plans. In line with the
management actions that accord
with national planning policies, we
have and will continue to object to
development at medium to high
N/A
DRAFT
Appendix 1

Page 57

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 51
long-term vulnerability of parts of our
coasts and islands. Under this approach,
new development in areas with medium
to high likelihood of flooding should be
avoided.
risk of flooding when it is contrary
to the risk framework set out in
Scottish Planning Policy. We have
and will continue to engage from
the start of the development plan
process and encourage planning
authorities to undertake a
Strategic Flood Risk Assessment
to inform their spatial strategy. We
remain committed to exercising
our planning functions with a view
to reducing overall flood risk, and
when a new national planning
policy context is finalised later in
2022 via the National Planning
Framework 4, we will take the
same approach. 
North Ayrshire Council completed
a Strategic Flood Risk
Assessment for LDP2 in May
2018. 
National Planning Framework 4 is
expected to be adopted by the
Scottish Parliament later in 2022
and will become part of the
DRAFT
Appendix 1

Page 58

Upper Garnock Catchment (Potentially Vulnerable Area 12/04) 52
Development Plan, ensuring
national planning policies on
flooding are applied in local
decision making. 
DRAFT
Appendix 1

Page 59

Kilwinning (Potentially Vulnerable Area 12/05) 53
4.5 Kilwinning (Potentially Vulnerable Area 12/05) 
Local Plan District  Local authority  Main catchment 
Ayrshire  North Ayrshire Council  River Garnock 
Summary of Progress for Kilwinning 
There are approximately 170 residential properties at risk of flooding. The Annual Average Damages is
approximately £400,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/05, please
click here. 
Key progress has been made with the completion of the Stevenston Point Integrated Catchment Study and the
Saltcoats, Ardrossan, Stevenston & Kilwinning (SASK) Surface Water Management Plan.
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Kilwinning 
DRAFT
Appendix 1

Page 60

Kilwinning (Potentially Vulnerable Area 12/05) 54
Summary of progress of actions to manage flood risk in the Kilwinning (PVA 12/05) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
New flood warning 
G
SEPA will continue with the
development and implementation of
a flood warning scheme on the River
Garnock. Detail of communities that
will benefit from the warnings will be
determined during scheme
development.
Once implemented SEPA will
continue to maintain the flood
warning scheme. When flood events
occur in an area with a flood
warning service, SEPA will seek to
verify and validate the warning
service.
SEPA will use feedback and post-
event data to ensure that our flood
warning service is timely and
accurate.
22/12/2015-
22/06/2022
SEPA has continued to operate the
flood warning service since it was
completed earlier in the FRM cycle.
N/A. 
Surface water
plan/study 
An integrated catchment study
covering the Meadowhead
catchment was carried out in SR10
2010-2015 to support the surface
22/12/2015-
31/12/2021
The Meadowhead ICS has been
completed. No areas within this PVA
were included to be taken forwards for
N/A. 
DRAFT
Appendix 1

Page 61

Kilwinning (Potentially Vulnerable Area 12/05) 55
water management planning
process in Kilmarnock, Greenholme,
Irvine, Prestwick and Ayr. The study
will improve knowledge and
understanding of the interactions
between the above ground and
below ground drainage network e.g.
with the sewer network,
watercourses and the sea.
optioneering as priority areas under
the ICS.
Surface water
plan/study 
G
North Ayrshire Council will develop
a surface water management plan
or plans to cover Irvine and
Kilwinning which set objectives for
the management of surface water
flood risk and identify the most
sustainable actions to achieve the
objectives.
01/06/2016-
01/06/2022
The Irvine surface water management
plan was completed in 2020 and the
Saltcoats, Ardrossan, Stevenston &
Kilwinning (SASK) Surface Water
Management Plan was completed in
2021. 
N/A. 
Surface water
plan/study 
G
An integrated catchment study
covering the Stevenston Point
catchment will be carried out to
support the surface water
management planning process in
Kilwinning, Saltcoats, Ardrossan and
Stevenston. The study will improve
knowledge and understanding of the
interactions between the above
ground and below ground drainage
01/06/2016-
01/06/2022
The Integrated Catchment Study for
Stevenston Point has been completed.
Outputs have been shared with local
authorities to inform Surface Water
Management Plans.
N/A
DRAFT
Appendix 1

Page 62

Kilwinning (Potentially Vulnerable Area 12/05) 56
network e.g. with the sewer network,
watercourses and the sea.
Surface water
plan/study
G
North Ayrshire Council will develop
a surface water management plan
or plans to cover Kilwinning,
Saltcoats, Ardrossan and
Stevenston which set objectives for
the management of surface water
flood risk and identify the most
sustainable actions to achieve the
objectives. Scottish Water will
provide local knowledge and
understanding of the sewer network.
This includes Scottish Water
corporate data (as applicable) and
outputs of the Stevenston Point
integrated catchment study and
Section 16 modelling, to assist with
the surface water management
planning process.
01/06/2016-
01/06/2022
The Saltcoats, Ardrossan, Stevenston
& Kilwinning (SASK) Surface Water
Management Plan was completed in
2021.
N/A. 
Strategic mapping
and modelling -
Section 16 
assessment
G
Scottish Water will undertake further
investigation and modelling in the
Three Town sewer catchment to
improve knowledge and
understanding of flood risk in this
area as required under Section 16 of
01/01/2016-
31/12/2020
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed. 
The assessment is now completed
and has been shared with the Local
Authority. 
DRAFT
Appendix 1

Page 63

Kilwinning (Potentially Vulnerable Area 12/05) 57
the Flood Risk Management
(Scotland) Act 2009.
Flood forecasting 
G
SEPA has continued to operate the
Scottish Flood Forecasting Service
(SFFS) Partnership with the Met
Office with daily, national flood
guidance statements issued to
Category 1 and 2 agencies (such as
emergency responders, local
authorities and other organisations
with flooding management duties).
Each daily statement gives an
assessment of the risk of flooding
for the next five days to help enable
these organisations to put
preparations in place to reduce the
impact of flooding. SEPA’s Flood
Alert service is freely available to
everyone and helps enable
communities to be aware and
prepared to reduce the impacts of
flooding.
22/12/2015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
N/A
DRAFT
Appendix 1

Page 64

Kilwinning (Potentially Vulnerable Area 12/05) 58
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
01/04/2016-
22/06/2022
North Ayrshire Council raised
awareness about flood risk via a
separate action noted for this PVA.
Specific awareness raising about flood
risk matters was achieved when the
Council’s flooding team responded to
reported flood incidents, enquiries from
prospective developers & flood risk
consultants and when responding to
planning application consultations.
N/A. 
Awareness raising 
G
North Ayrshire Council, SEPA and
Scottish Water collectively work to
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
N/A. 
DRAFT
Appendix 1

Page 65

Kilwinning (Potentially Vulnerable Area 12/05) 59
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council's Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
North Ayrshire Council raised
awareness about flood risk matters by
updating the Council’s website and by
supporting Local Flood Emergency
Groups. 
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
01/06/2016-
01/06/2022
North Ayrshire Council inspected trash
screens, watercourses and coastal
N/A.
DRAFT
Appendix 1

Page 66

Kilwinning (Potentially Vulnerable Area 12/05) 60
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
flood protection structures in
accordance with the published
inspection programme throughout the
1st Local Flood Risk Management
Plan cycle.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
01/06/2016-
01/06/2022
North Ayrshire Council commissioned
emergency plans, aimed at Category 1
and 2 responders, for population
centres within North Ayrshire that have
a notable flood risk. These plans were
completed in September 2020.
N/A. 
DRAFT
Appendix 1

Page 67

Kilwinning (Potentially Vulnerable Area 12/05) 61
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
N/A
DRAFT
Appendix 1

Page 68

Kilwinning (Potentially Vulnerable Area 12/05) 62
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
North Ayrshire Council completed a
Strategic Flood Risk Assessment for
LDP2 in May 2018.  
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making. 
DRAFT
Appendix 1

Page 69

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 63
4.6 River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 
Local Plan District  Local authority  Main catchment 
Ayrshire  East Ayrshire Council, East Renfrewshire
Council, North Ayrshire Council, South Ayrshire Council,
River Irvine 
Summary of Progress for River Irvine and Annick Water 
There are approximately 2,900 residential properties at risk of flooding. The Annual Average Damages are
approximately £7.1 million. Further information can be found in the Ayrshire Local FRMP under PVA 12/06,
please click here. 
Key progress has been made with the completion of the Upper and Lower Irvine Valley Flood Protection Studies,
including option appraisal. 
The River Irvine Catchment has been exposed to a number of significant recent weather events during Storm
Edmund and Storm Frank in 2016. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in River Irvine and Annick Water 
DRAFT
Appendix 1

Page 70

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 64
Summary of progress of actions to manage flood risk in the River Irvine and Annick Water
(PVA 12/06) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
New Flood
Warning
Newmilns, Galston,
Kilmarnock, Irvine
and Stewarton
G
The scope of a new flood warning
for the River Irvine is currently being
examined. The area under
consideration for a new flood
warning includes properties in
Newmilns affected by flooding from
the River Irvine. The risk to Galston
will be reviewed using the councils
new flood study for the River Irvine.
This could impact on the potential
for provision of warnings at Galston.
For areas where the risk is from the
Irvine an update to the flood
forecasting system will be required.   
Another area under consideration
includes properties in Kilmarnock
affected by flooding from the
Kilmarnock Water and River Irvine.
An update to the existing flood
forecasting system will be required
to deliver flood warning in this
20/03/2016
-
19/06/2020
The River Irvine flood forecasting
system has been updated in
Kilmarnock to include an operational
warning at Burnside and a new flood
warning area on the Kilmarnock Water
in Kilmarnock and continues to cover
the Queens drive, New Mill Road and
Samson Avenue area. 
A new flood warning service for the
Annick Water has been completed,
with three new flood warning areas
provided for Stewarton, Perceton and
the Annick Water in Irvine. 
New flood warning areas have also
been provided for Shewalton and
Springbank industrial estates, as well
as updating the Low Green (previously
waterside) flood warning area.
N/A. 
DRAFT
Appendix 1

Page 71

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 65
location. Flood warning is also
required for properties mainly in
Irvine and Stewarton affected by
flooding from the Annick Water. Full
scoping, infrastructure and a flood
forecasting system will be required
to develop a new flood warning
scheme in this area.
Flood protection
study 
G
Upper Irvine Valley Flood Study and
option appraisal 
01/06/2016-
01/06/2022
The Upper River Irvine Valley Flood
Study including fluvial modelling is
complete. The option appraisal is
complete and a Scheme was
submitted for prioritisation in
December 2018. 
The submitted scheme offeres a 1:100
year level of protection and was valued
at £27M at time of submission. 
Awaiting outcome of Scottish
Government Prioritisation of Flood
Schemes and Funding Review.   
Surface water
plan/study 
An integrated catchment study
covering the Meadowhead
catchment was carried out in SR10
(2010-2015). This study will help to
support the surface water
management planning process in
01/06/2016-
01/06/2022
Pre Optioneering Catchment Plan and
prioritisation stages completed.
The Optioneering Phase was
completed. The implementation of the
findings will be considered in
N/A. 
DRAFT
Appendix 1

Page 72

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 66
Kilmarnock, Greenholm, Irvine,
Prestwick and Ayr. The study has
improved knowledge and
understanding of flood risk and
interactions between the above
ground and below ground drainage
network e.g. with the sewer network
and watercourses. The Optioneering
phase of this study, to establish the
preferred solution(s) to the flooding
issues, is now being progressed. 
coordination with Scottish Water in the
next cycle of FRM Plan. 
Surface water
plan/study 
G
North and East Ayrshire Council will
develop a surface water
management plan
or plans to cover Irvine and
Kilmarnock which set objectives for
the management of surface water
flood risk and identify the most
sustainable actions to achieve the
objectives.
01/06/2016-
01/06/2022
The Irvine Surface Water Management
Plan was completed in 2020.
The report was issued to Scottish
Water and SEPA. 
Most issues are for either Scottish
Water or East Ayrshire Council and
both authorities will action as
appropriate.
N/A. 
Strategic mapping
and modelling 
River Irvine
mapping
improvements
G
SEPA will work with East Ayrshire
Council to improve the
understanding of flood risk along the
River Irvine. The Council are leading
on the production of the River Irvine
modelling with SEPA providing
01/01/2016- 
31/12/2020
Action complete. Updated river flood
hazard mapping for the River Irvine
was published on the SEPA website in
November 2020.   
N/A
DRAFT
Appendix 1

Page 73

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 67
advice and reviewing information
during the process. SEPA will
update strategic surface water
mapping in some parts of this
catchment to improve understanding
of flood risk. The inclusion of
additional surface water hazard data
resulting from the completion of
local authority surface water
management plans will be
considered as these projects are
completed.
Strategic mapping
and modelling 
Pluvial mapping
update
A
SEPA will update strategic surface
water mapping in some parts of this
catchment to improve understanding
of flood risk. The inclusion of
additional surface water hazard data
resulting from the completion of
local authority surface water
management plans will be
considered as these projects are
completed.
01/01/2016- 
31/12/2020
SEPA's current Surface water hazard
maps use design rainfall estimates
based on FEH99 methodology, this
has now been superseded by FEH22
methodology. The FEH22 dataset
contains the latest science and
understanding of rainfall across
Scotland and represents a significant
change in rainfall amounts compared
to FEH99 dataset, as such it is no
longer consider appropriate to deliver
this action as originally intended.  This
action will not be taken forwards as
described. A major national update of
the surface water maps is underway
The national surface water
flooding modelling project will be
completed in 2023.  The outputs
from this will be used to update
SEPA maps early in cycle 2 and
will inform SEPA's flood risk
assessments for the next flood
risk management cycle.
DRAFT
Appendix 1

Page 74

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 68
which will deliver updated surface
water flooding maps for Scotland
representing the latest scientific
understanding.  
Strategic mapping
and modelling
Section 16
Assessment 
Scottish Water will undertake further
investigation and modelling in the
Meadowhead Point sewer
catchment to improve knowledge
and understanding of flood risk in
this area as required under Section
16 of the Flood Risk Management
(Scotland) Act 2009.
01/01/2016-
31/12/2020
The Meadowhead ICS has been
completed. No areas within this PVA
were included to be taken forwards for
optioneering as priority areas under
the ICS.
N/A 
Maintain flood
protection
scheme*
G
The Kilmarnock Flood Protection
Scheme was designed to mitigate
flooding from the River Irvine in the
Riccarton and Crookedholm areas
of Kilmarnock. The scheme has a
standard of protection of 100 years. 
The schemes currently constructed
form two main types:
Walled structures maintained under
the Annual Flap valve and Penstock
Maintenance Contract; and earth
embankments maintained by Panel
engineers and supported by the
annual grass cutting contract (to
allow inspection).
01/06/2016-
01/06/2022
East Ayrshire Council continues to
carry out its maintenance contracts.
The Council will continue to inspect
and maintain the flood protection
structures within the catchment.
N/A. 
DRAFT
Appendix 1

Page 75

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 69
Maintain flood
protection
scheme* 
G
Defences along the banks of the
Irvine River protect properties in the
Waterside up to a 20 year flood.
North Ayrshire Council will continue
to inspect and maintain the River
Irvine flood defences at Waterside,
which will continue to manage
flooding according to the design
standard at the time of construction.
Given the relatively minor nature of
the structures, the inspection works
will be scheduled as part of the
Council`s duties in accordance with
Sections 18 of the Flood Risk
Management (Scotland) Act 2009.
In 2014 the River embankment
stabilisation was carried out, and
recently the surface water outfall
valves were inspected and proposed
to be lowered/replaced as part of the
surface water flood mitigation effort
for the area. If the defences remain
the same, levels of flood risk are
likely to increase over time as a
consequence of climate change.
01/06/2016-
01/06/2022
The flood defences at Waterside,
Irvine were inspected by North
Ayrshire Council in accordance with
the Council’s published inspection
schedule. 
N/A.  
Maintain flood
warning 
G
SEPA will continue to maintain the
Irvine Waterside/Low Green flood
22/12/2015-
22/06/2022
The River Irvine flood forecasting
system has been updated in
N/A
DRAFT
Appendix 1

Page 76

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 70
Irvine
Waterside/Low
Green flood
warning areas in
Irvine and the
Queen's Drive,
New Mill Road and
Samson Avenue
flood warning
areas in Kilmarnock
warning area in Irvine and the
Queen's Drive, New Mill Road and
Samson Avenue flood warning
areas in Kilmarnock which are part
of the Irvine river flood warning
scheme. When flood events occur in
an area with a flood warning service,
SEPA will seek to verify and validate
the warning service. SEPA will use
feedback and post-event data to
ensure that our flood warning
service is timely and accurate.
Kilmarnock to include an operational
warning at Burnside and a new flood
warning area on the Kilmarnock Water
in Kilmarnock and continues to cover
the Queens Drive, New Mill Road and
Samson Avenue area. 
A new flood warning service for the
Annick Water has been completed,
with three new flood warning areas
provided for Stewarton, Perceton and
the Annick Water in Irvine. 
New flood warning areas have also
been provided for Shewalton and
Springbank industrial estates, as well
as updating the Low Green (previously
waterside) flood warning area.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
22/12/2015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
N/A
DRAFT
Appendix 1

Page 77

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 71
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Community flood
action groups 
G
Although not part of a community
flood action group the public take an
active interest in flooding issues
within Galston and inform the
Council about debris in the
watercourse. East Ayrshire Council
01/06/2016-
22/06/2022
East Ayrshire Council, SEPA and
Scottish Water will continue to engage
with responsible authorities and all
other stakeholders, including
community groups and the public to
raise awareness of flood risk and how
N/A. 
DRAFT
Appendix 1

Page 78

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 72
will liaise with the group through
Community Council meetings and
directly to the public.
those affected can be better prepared.
EAC will continue the ongoing support
for the Community Flood Group. 
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
01/04/2016-
22/06/2022
North Ayrshire Council and East
Ayrshire Council raised awareness
about flood risk via a separate action
noted for this PVA. Specific awareness
raising about flood risk matters was
achieved when the Councils’ flooding
teams responded to reported flood
incidents, enquiries from prospective
developers & flood risk consultants
and when responding to planning
application consultations. 
N/A. 
Awareness raising 
G
North Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
N/A. 
DRAFT
Appendix 1

Page 79

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 73 
Awareness raising 
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council's Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline). Scottish Water
will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies. Further
Information is provided on North
Ayrshire Council, SEPA, Scottish
Water websites.
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
North Ayrshire Council raised
awareness about flood risk matters by
updating the Council’s website and by
supporting Local Flood Emergency
Groups. 
DRAFT
Appendix 1

Page 80

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 74
Awareness raising 
G
East Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared.
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline).
Scottish Water will provide targeted
flooding communications for
Scottish Water specific activities and
raise awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
Further Information is provided on
East Ayrshire Council, SEPA,
Scottish Water and Ayrshire Road
Alliance websites.
01/04/2016-
22/06/2022
East Ayrshire Council and SEPA has
delivered a range of awareness raising
activities through campaigning,
education activities and partnership
delivery. We have run national and
local digital and direct engagement
campaigns to raise awareness of flood
risk and SEPA’s flood warning service,
Floodline. We publish and publicise an
electronic newsletter (Flooding
Gateway) four times a year which is
distributed to a wide audience. SEPA
are working with Education Scotland
and Scottish Government Resilience
team to embed flooding awareness
within the Curriculum for Excellence,
and resilience partners in Safer
Communities programmes. We have
also developed an online tool that
helps everyone share information on
current flooding issues (Report-a-
Flood). We have worked in partnership
with local authorities, emergency
services and community organisations
(e.g. Neighbourhood Watch Scotland,
Citizens Advice Scotland and others)
to share our resources and help to
East Ayrshire Council and SEPA
will continue to raise awareness
of flood risk through campaigning,
developing education and
engagement tools, creating new
partnerships and improving the
flood warning and forecasting
service.  Many of our awareness
raising activities currently
underway will continue.  Our
focus will be on promoting flood
warning and forecasting service,
innovation, education and
engagement with partners,
customers and the public. 
DRAFT
Appendix 1

Page 81

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 75
promote preparedness and
understanding of how we manage
flood risk in Scotland. We have
actively supported the Scottish Flood
Forum and worked closely with UK
agencies to develop joint flooding
information.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
01/06/2016-
01/06/2022
North Ayrshire Council inspected trash
screens, watercourses and coastal
flood protection structures in
accordance with the published
inspection programme throughout the
1st Local Flood Risk Management
Plan cycle. 
N/A. 
Maintenance 
G
East Ayrshire Council in accordance
with Section 18 of the FR Scotland
Act 2009 undertake assessment of
water bodies to determine whether
01/06/2016-
01/06/2022
High risk locations such as those with
screens and smaller culverts are
inspected in a scheduled basis. The
majority of inspections are to be
The Council will continue to
inspect and maintain
watercourses, screens and other
relevant Council assets.
DRAFT
Appendix 1

Page 82

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 76
works of clearance and repair would
substantially reduce risk of flooding.
This information is used to produce
a schedule of works, which is
available for the public to inspect
undertaken in the winter months when
flows are higher and water born debris
can be an issue.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
01/06/2016-
01/06/2022
North Ayrshire Council commissioned
emergency plans, aimed at Category 1
and 2 responders, for population
centres within North Ayrshire that have
a notable flood risk. These plans were
completed in September 2020.
N/A. 
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
N/A. 
DRAFT
Appendix 1

Page 83

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 77
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
DRAFT
Appendix 1

Page 84

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 78
North Ayrshire Council completed a
Strategic Flood Risk Assessment for
LDP2 in May 2018.   
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making. 
East Ayrshire Council are Planning to
update their LDP in 2022 – 23.
East Ayrshire Council has prepared
and consulted on its Proposed Plan
LDP2. As part of the preparation of the
Plan, the Council engaged early with
SEPA on sites it was considering
allocating and took on board
comments from SEPA. In addition, The
Council has worked extensively with
SEPA and the KAG on issues
pertaining to flooding in Kilmarnock
and has undertaken a series of flood
workshops with the Key Agencies. The
new proposed plan contains flood
DRAFT
Appendix 1

Page 85

River Irvine and Annick Water (Potentially Vulnerable Area 12/06) 79
policies reflective of SEPA’s stance
and of NPF4.   
DRAFT
Appendix 1

Page 86

Irvine to Troon (Potentially Vulnerable Area 12/07) 80
4.6 Irvine to Troon (Potentially Vulnerable Area 12/07) 
Local Plan District  Local authority  Main catchment 
Ayrshire  North Ayrshire Council, South Ayrshire Council  Monkton to Irvine coastal 
Summary of Progress for Irvine to Troon 
There are approximately 1,000 residential properties at risk of flooding. The Annual Average Damages are
approximately £1.3 million. Further information can be found in the Ayrshire Local FRMP under PVA 12/07,
please click here. 
The Ayrshire Shoreline Management Plan was completed and adopted by both North and South Ayrshire
Councils in September 2018.The Meadowhead Integrated Catchment Study and the Irvine Surface Water
Management Plan were also completed.   Natural flood risk measures in South Ayrshire in the form of sand
dune propagation have successfully continued throughout the reporting period.  © Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Irvine to Troon 
DRAFT
Appendix 1

Page 87

Irvine to Troon (Potentially Vulnerable Area 12/07) 81
Summary of progress of actions to manage flood risk in the Irvine to Troon (PVA 12/07) 
Action Status Description Dates Progress in Delivery,
including key deliverables and
dates
Revised dates and planned
actions to complete / address
delay
Natural flood
management works 
G
South Ayrshire Council are currently
undertaking sand dune propagation
in Troon, and some of the benefits
of these actions are to help reduce
the risk of coastal erosion and
flooding. It is recommended that this
should continue.
22/12/2015-
22/06/2022
This work continues to be
carried out on an annual basis. 
The Council will continue to
undertake sand dune
propagation.
Flood protection
study 
G
A shoreline management plan is
recommended, this study is not
limited to Potentially Vulnerable
Areas but should cover the whole of
the Ayrshire coastline and any areas
beyond this which may be
influenced by changes in coastal
processes. The study should
investigate flooding and coastal
erosion, wave overtopping and the
current coastal protection offered.
The study will help to develop an
understanding of coastal issues and
identify where further work may be
required to mitigate against flooding.
01/06/2016-
01/06/2022
The Ayrshire Shoreline
Management Plan was
completed and was adopted by
both North Ayrshire Council and
South Ayrshire Council in
September/October 2018.  
N/A.  
DRAFT
Appendix 1

Page 88

Irvine to Troon (Potentially Vulnerable Area 12/07) 82
Surface Water
Management Plan 
G
An integrated catchment study
covering the Meadowhead
catchment was carried out in SR10
(2010-2015). This study will help to
support the surface water
management planning process in
Kilmarnock, Greenholm, Irvine,
Prestwick and Ayr. The study has
improved knowledge and
understanding of flood risk and
interactions between the above
ground and below ground drainage
network e.g. with the sewer network
and watercourses. The Optioneering
phase of this study, to establish the
preferred solution(s) to the flooding
issues, is now being progressed. 
01/06/2016-
01/06/2022
The Meadowhead ICS has been
completed. No areas of this PVA
were included to be taken
forwards for optioneering as
priority areas under the ICS.
N/A. 
Surface water
plan/study
G
North Ayrshire Council will develop
a surface water management plan
or plans to cover Irvine town which
set objectives for the management
of surface water flood risk and
identify the most sustainable actions
to achieve the objectives.
01/06/2016-
01/06/2022
The Irvine Surface Water
Management Plan was
completed in 2020.
N/A. 
A
SEPA will seek to develop flood
mapping in the Ayr to Ardrossan
22/12/2016 –
01/06/2022
Work completed to date includes
the production of key data sets
SEPA will complete a review of
coastal flood hazard mapping in
DRAFT
Appendix 1

Page 89

Irvine to Troon (Potentially Vulnerable Area 12/07) 83 
Strategic mapping
and modelling 
area to improve understanding of
coastal flood risk. The extent and
timing of improvements will depend
on detailed scoping and data
availability. The coastal mapping
and modelling process will start in
2016, with early work focussing on
methodology development and data
collection. Once this stage has been
completed a thorough review will be
carried out to identify the final
mapping improvements that can be
made in the area. Where this work
coincides with local authority
studies, SEPA will work
collaboratively to ensure consistent
modelling approaches are applied.
including extreme water levels
and offshore wave and wind
conditions to support future
coastal modelling work.  
south west Scotland including in
this area. This includes identifying
where taking account of the
impact of waves on flooding from
the sea may be required. SEPA
will collect the required coastal
defence asset and other
information necessary to progress
with improved flood modelling and
mapping in the highest priority
areas taking account of wave
overtopping where required.
SEPA will look for opportunities to
progress future modelling work in
a way that best supports
improvements to SEPA’s Coastal
Flood Warning Schemes.
Expected to progress to the next
stage around the middle of cycle
2 and complete early in the
following cycle, subject to funding.         
Strategic mapping
and modelling-
Section 16
assessment 
Scottish Water will undertake further
investigation and modelling in the
Meadowhead sewer catchment to
improve knowledge and
understanding of flood risk in this
area as required under Section 16 of
01/01/2016-
31/12/2020
The Meadowhead ICS has been
completed. No areas within this
PVA were included to be taken
forwards for optioneering as
priority areas under the ICS.
N/A. 
DRAFT
Appendix 1

Page 90

Irvine to Troon (Potentially Vulnerable Area 12/07) 84
the Flood Risk Management
(Scotland) Act 2009.
Maintain flood
protection
scheme* 
G
In Troon there are sections of
seawalls, rock armour and gabion
mattresses running from the golf
club to the harbour and north of the
harbour to Beach Road. These
defences offer some level of
protection to the properties in this
area. These defences will be
maintained and will continue to
manage flooding according to the
design standard at the time of
construction.
01/06/2016-
01/06/2022
This work continues to be
carried out on an annual basis.
South Ayrshire Council will
continue to inspect and maintain
the flood protection structures
within the catchment.
N/A. 
Maintain flood
warning 
Troon Coastal,
Troon Central and
Prestwick Links
Road flood warning
areas
G
SEPA will continue to maintain the
Troon Coastal, Troon Central and
Prestwick Links Road flood warning
areas which are part of the Firth of
Clyde coastal flood warning
scheme. When flood events occur in
an area with a flood warning service,
SEPA will seek to verify and validate
the warning service. SEPA will use
feedback and post-event data to
ensure that our flood warning
service is timely and accurate.
22/12/2015-
22/06/2022
SEPA has continued to operate
the flood warning service.
N/A
DRAFT
Appendix 1

Page 91

Irvine to Troon (Potentially Vulnerable Area 12/07) 85
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
22/12/2015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting
Service with the Met Office, with
daily Flood Guidance
Statements and regional Flood
Alerts issued as required to
enable communities and
responders to reduce the
impacts of flooding. SEPA in
partnership with the Met Office
has developed a public version
of the daily Flood Guidance
Statement, the Scottish Flood
Forecast, to provide better and
earlier information to the public.
A beta version of this product
was launched in May 2022. It
will be refined in the wake of
user feedback. A more focussed
version of the product,
producing guidance at a local
level, is planned for the next
flood risk management cycle. 
Options for developing forecasts
of surface water flooding have
been published in 2022 to help
urban areas and the transport
N/A
DRAFT
Appendix 1

Page 92

Irvine to Troon (Potentially Vulnerable Area 12/07) 86
network improve their resilience
to and preparedness for
flooding. The development and
wider roll-out of this service is
being considered alongside the
technical, resource and
communication challenges
associated with providing
surface water flooding guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
01/04/2016-
22/06/2022
North Ayrshire Council and
South Ayrshire Council raised
awareness about flood risk via a
separate action noted for this
PVA. Specific awareness raising
about flood risk matters was
achieved when the Councils’
flooding team responded to
reported flood incidents,
enquiries from prospective
developers & flood risk
consultants and when
responding to planning
application consultations.
N/A. 
DRAFT
Appendix 1

Page 93

Irvine to Troon (Potentially Vulnerable Area 12/07) 87
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
North Ayrshire Council, South
Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council's Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management. 
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline).  Scottish Water
will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
22/12/2015-
22/06/2022
SEPA continues to work with
others to raise awareness of
flood risk and its flood warning
service. It has participated in
local activities including school /
education and community
resilience activities when able.
Some planned activities notably
in person joint events have been
limited or delayed due to Covid
19. 
North Ayrshire Council raised
awareness about flood risk
matters by updating the
Council’s website and by
supporting Local Flood
Emergency Groups. 
Awareness raising is a
continuous activity for South
Ayrshire Council which is
actioned by updating the
Council’s website, working with
partners and engagement with
N/A. 
DRAFT
Appendix 1

Page 94

Irvine to Troon (Potentially Vulnerable Area 12/07) 88
supplying targeted information to the
public on large capital projects and
detailed local studies.
relevant stakeholders as
appropriate. 
Maintenance
General
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk-based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
01/06/2016-
01/06/2022
North Ayrshire Council
inspected trash screens,
watercourses and coastal flood
protection structures in
accordance with the published
inspection programme
throughout the 1st Local Flood
Risk Management Plan cycle. 
South Ayrshire Council carry out
monthly inspections and
clearance work where
necessary on 17 debris screens
where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are
known flood risk issues. 25km of
coastal protection structures are
inspected annually. 
N/A. 
Maintain flood
Protection
Schemes
G
In Troon there are sections of
seawalls, rock armour and gabion
mattresses running from the golf
club to the harbour and north of the
01/06/2016-
01/06/2022
This work continues to be
carried out on an annual basis. 
N/A. 
DRAFT
Appendix 1

Page 95

Irvine to Troon (Potentially Vulnerable Area 12/07) 89
harbour to Beach Road. These
defences offer some level of
protection to the properties in this
area. These defences will be
maintained and will continue to
manage flooding according to the
design standard at the time of
construction.
The Council will continue to
inspect and maintain the flood
protection structures within the
catchment.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
01/06/2016-
01/06/2022
North Ayrshire Council
commissioned emergency
plans, aimed at Category 1 and
2 responders, for population
centres within North Ayrshire
that have a notable flood risk.
These plans were completed in
September 2020. 
The Ayrshire Civil Contingency
Team has developed
emergency plans for major
flooding incidents in the South
Ayrshire Council area in
partnership with Category 1 and
2 responders.
N/A. 
DRAFT
Appendix 1

Page 96

Irvine to Troon (Potentially Vulnerable Area 12/07) 90
supported by the work of voluntary
organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the
delivery of sustainable flood risk
management and we support
the delivery of FRM Plans and
Local FRM Plans. In line with
the management actions that
accord with national planning
policies, we have and will
continue to object to
development at medium to high
risk of flooding when it is
contrary to the risk framework
set out in Scottish Planning
Policy. We have and will
continue to engage from the
start of the development plan
process and encourage planning
authorities to undertake a
Strategic Flood Risk
Assessment to inform their
spatial strategy. We remain
committed to exercising our
N/A. 
DRAFT
Appendix 1

Page 97

Irvine to Troon (Potentially Vulnerable Area 12/07) 91
planning functions with a view to
reducing overall flood risk, and
when a new national planning
policy context is finalised later in
2022 via the National Planning
Framework 4, we will take the
same approach. 
North Ayrshire Council
completed a Strategic Flood
Risk Assessment for LDP2 in
May 2018.  In addition, the
Ayrshire Shoreline Management
Plan (SMP), which prompts land
use, policy changes and further
studies to allow physical
protective measures to take
place in the future was adopted
by North Ayrshire Council and
South Ayrshire Council in
September 2018. 
National Planning Framework 4
is expected to be adopted by the
Scottish Parliament later in 2022
and will become part of the
Development Plan, ensuring
DRAFT
Appendix 1

Page 98

Irvine to Troon (Potentially Vulnerable Area 12/07) 92
national planning policies on
flooding are applied in local
decision making. 
The South Ayrshire Council
Local Development Plan
recognises the importance of
sustainable flood risk
management in both urban and
rural developments and is in
alignment with Scottish Planning
Policy. The Local Development
Plan was published in February
2022. 
DRAFT
Appendix 1

Page 99

Isle of Arran (Potentially Vulnerable Area 12/08) 93
4.8 Isle of Arran (Potentially Vulnerable Area 12/08) 
Local Plan District  Local authority  Main catchment 
Ayrshire  North Ayrshire Council  Brodick to Kilmory – Arran coastal 
Summary of Progress for Isle of Arran 
There are approximately 120 residential properties at risk of flooding. The Annual Average Damages are
approximately £390,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/08, please
click here.  
Key progress has been made with the completion of the Ayrshire Shoreline Management Plan and the
completion of the flood study at Brodick and Lamlash. The design of the Brodick Flood Protection Scheme,
which also includes measures in Lamlash is an action in the published Cycle 2 Flood Risk Management Plan . 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Isle of Arran 
DRAFT
Appendix 1

Page 100

Isle of Arran (Potentially Vulnerable Area 12/08) 94
Summary of progress of actions to manage flood risk in the Isle of Arran (PVA 12/08)
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
study 
G
A study will be undertaken to further
investigate river flood risk combined
with coastal flood risk to Brodick and
Lamlash. This study should build on
the work within the shoreline
management plan to provide a
detailed investigation of the current
and future risk.  The study should
examine the most sustainable
combination of actions to manage
flooding.
01/04/2018-
13/03/2020
The study identified a preferred option
for the Brodick Flood Protection
Scheme, which includes measures in
the neighbouring village of Lamlash. 
The design of the Brodick Flood
Protection Scheme is an action
identified in the Flood Risk
Management Plan, published by SEPA
in 2021. 
N/A.   
Flood protection
study
G
A shoreline management plan is
recommended, this study is not
limited to Potentially Vulnerable
Areas but should cover the whole of
the Ayrshire coastline and any areas
beyond this which may be
influenced by changes in coastal
processes. The study should
investigate flooding and coastal
erosion, wave overtopping and the
current coastal protection offered.
The study will help to develop an
01/06/2016-
01/06/2022
The Ayrshire Shoreline Management
Plan was completed and was adopted
by both North Ayrshire Council and
South Ayrshire Council in
September/October 2018.  
N/A. 
DRAFT
Appendix 1

Page 101

Isle of Arran (Potentially Vulnerable Area 12/08) 95
understanding of coastal issues and
identify where further work may be
required to mitigate against flooding.
Maintain flood
protection
scheme* 
G
There are a range of formal and
informal coastal defences in Brodick
and Lamlash. These defences offer
some level of protection to the
properties in this area. North
Ayrshire Council will continue to
inspect and maintain the Brodick
and Lamlash coastal flood defences,
which will continue to manage
flooding according to the design
standard at
the time of construction.
01/06/2016-
01/06/2022
The coastal flood defence structures in
Brodick and Lamlash were either
inspected on an annual basis
throughout the 1st Local Flood Risk
Management Plan cycle and were
subject to a principal inspection every
three years or were inspected in
accordance with the inspection
schedule published by North Ayrshire
Council.
N/A. 
Maintain flood
warning 
Arran Lamlash
Cordon and Arran
Seafront and
Montrose Terrace
flood warning
areas
G
SEPA will continue to maintain the
Arran Lamlash Cordon and the
Arran Seafront and Montrose
Terrace flood warning areas which
are part of the Firth of Clyde coastal
flood warning scheme.
22/12/2015-
22/06/2022
SEPA has continued to operate the
flood warning service.
N/A
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
22/12/2015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
N/A. 
DRAFT
Appendix 1

Page 102

Isle of Arran (Potentially Vulnerable Area 12/08) 96
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
01/04/2016-
22/06/2022
North Ayrshire Council raised
awareness about flood risk via a
separate action noted for this PVA.
N/A. 
DRAFT
Appendix 1

Page 103

Isle of Arran (Potentially Vulnerable Area 12/08) 97
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
Specific awareness raising about flood
risk matters was achieved when the
Council’s flooding team responded to
reported flood incidents, enquiries from
prospective developers & flood risk
consultants and when responding to
planning application consultations.
Awareness raising 
G
North Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council's Flood
Risk Management Team attend
community council events to discuss
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
N/A.  
DRAFT
Appendix 1

Page 104

Isle of Arran (Potentially Vulnerable Area 12/08) 98
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline).  Scottish Water
will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
North Ayrshire Council raised
awareness about flood risk matters by
updating the Council’s website and by
supporting Local Flood Emergency
Groups. 
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk-based inspection,
maintenance and repair on the
01/06/2016-
01/06/2022
North Ayrshire Council inspected trash
screens, watercourses and coastal
flood protection structures in
accordance with the published
inspection programme throughout the
1st Local Flood Risk Management
Plan cycle.
N/A. 
DRAFT
Appendix 1

Page 105

Isle of Arran (Potentially Vulnerable Area 12/08) 99
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
01/06/2016-
01/06/2022
North Ayrshire Council commissioned
emergency plans, aimed at Category 1
and 2 responders, for population
centres within North Ayrshire that have
a notable flood risk. These plans were
completed in September 2020.
N/A. 
DRAFT
Appendix 1

Page 106

Isle of Arran (Potentially Vulnerable Area 12/08) 100
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
N/A. 
DRAFT
Appendix 1

Page 107

Isle of Arran (Potentially Vulnerable Area 12/08) 101
North Ayrshire Council completed a
Strategic Flood Risk Assessment for
LDP2 in May 2018.  In addition, the
Ayrshire Shoreline Management Plan
(SMP), which prompts land use, policy
changes and further studies to allow
physical protective measures to take
place in the future was adopted by
North Ayrshire Council and South
Ayrshire Council in September 2018.  
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making. 
DRAFT
Appendix 1

Page 108

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 102
4.9 Prestwick to Ayr (Potentially Vulnerable Area 12/09) 
Local Plan District  Local authority  Main catchment 
Ayrshire  South Ayrshire Council  Doonfoot to Monkton coastal 
Summary of Progress for Prestwick to Ayr 
There are approximately 300 residential properties at risk of flooding. The Annual Average Damages are
approximately £240,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/09, please
click here. 
The Ayrshire Shoreline Management Plan has been completed and was adopted by both North and South
Ayrshire Councils in September/October 2018. The Meadowhead Integrated Catchment Study and Surface
Water Management Plans for Ayr and Prestwick are complete.  
Natural flood risk measures in South Ayrshire in the form of sand dune propagation have successfully continued
through the reporting period. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Prestwick to Ayr 
DRAFT
Appendix 1

Page 109

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 103 
Summary of progress of actions to manage flood risk in the Prestwick to Ayr (PVA 12/09) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Natural flood
management
works 
G
South Ayrshire Council are currently
undertaking sand dune propagation
at  Prestwick North Beach and Ayr
South Beach. Some of the benefits
of these actions are to help reduce
the risk of coastal erosion and
flooding. It is recommended that this
should continue. 
22/12/2015-
22/06/2022
This work continues to be carried out
on an annual basis. 
The Council will continue to undertake
sand dune propagation.
N/A. 
Flood protection
study 
G
A shoreline management plan is
recommended; this study is not
limited to Potentially Vulnerable
Areas but should cover the whole of
the Ayrshire coastline and any areas
beyond this which may be
influenced by changes in coastal
processes. The study should
investigate flooding and coastal
erosion, wave overtopping and the
current coastal protection offered.
01/06/2016-
01/06/2022
The Ayrshire Shoreline Management
Plan is completed and adopted by both
North and South Ayrshire Councils in
September/October 2018.   
The Ayrshire Shoreline Management
Plan will be reviewed every 6 years.
N/A. 
DRAFT
Appendix 1

Page 110

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 104
The study will help to develop an
understanding of coastal issues and
identify where further work may be
required to mitigate against flooding.
Surface water
plan/study 
G
An integrated catchment study
covering the Meadowhead
catchment was carried out in SR10
(2010-2015). This study will help to
support the surface water
management planning process in
Kilmarnock, Greenholm, Irvine,
Prestwick and Ayr. The study has
improved knowledge and
understanding of flood risk and
interactions between the above
ground and below ground drainage
network e.g. with the sewer network
and watercourses. The Optioneering
phase of this study, to establish the
preferred solution(s) to the flooding
issues, is now being progressed. 
01/06/2016-
01/06/2022
Pre Optioneering Catchment Plan and
prioritisation stages completed. 
The Optioneering Phase was
completed in June 2021. 
The implementation of the findings are
currently being considered in
coordination with Scottish Water and
detailed design has commenced. This
will continue in the next cycle of the
FRM Plan. 
N/A.
Surface water
plan/study 
G
South Ayrshire Council will develop
a surface water management plan
or plans to cover Prestwick and Ayr
which set objectives for the
management of surface water flood
01/06/2016-
01/06/2022
The Surface water management Plan
for South Ayrshire Council catchments
was completed in November 2021.
N/A. 
DRAFT
Appendix 1

Page 111

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 105
risk and identify the most
sustainable actions to achieve the
objectives.
The implementation of the findings will
be considered in the next cycle of FRM
Plan.
Strategic mapping
and modelling
Section 16
Assessment 
Scottish Water will undertake further
investigation and modelling in the
Prestwick and Ayr sewer catchment
to improve knowledge and
understanding of flood risk in this
area as required under Section 16 of
the Flood Risk Management
(Scotland) Act 2009.
01/01/2016-
31/12/2020
The Optioneering phase of the ICS
has been completed. This has
identified potential solutions to reduce
surface water flood risk in priority
areas within Prestwick.
N/A. 
Strategic mapping
and modelling 
A
SEPA will seek to develop flood
mapping in the Ayr to Ardrossan
area to improve understanding of
coastal flood risk. The extent and
timing of improvements will depend
on detailed scoping and data
availability. Where this work
coincides with local authorities. 
01/06/2016-
01/06/2022
Work completed to date includes the
production of key data sets including
extreme water levels and offshore
wave and wind conditions to support
future coastal modelling work.  
SEPA will complete a review of
coastal flood hazard mapping in
south west Scotland including in
this area. This includes identifying
where taking account of the
impact of waves on flooding from
the sea may be required. SEPA
will collect the required coastal
defence asset and other
information necessary to progress
with improved flood modelling and
mapping in the highest priority
areas taking account of wave
overtopping where required.
SEPA will look for opportunities to
progress future modelling work in
DRAFT
Appendix 1

Page 112

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 106
a way that best supports
improvements to SEPA’s Coastal
Flood Warning Schemes.
Expected to progress to the next
stage around the middle of cycle
2 and complete early in the
following cycle, subject to funding.  
Maintain flood
protection
scheme* 
G
The South Pier protects the
entrance of Ayr Harbour from the
action of waves while also reducing
siltation in the channel. An existing
seawall runs from the South Pier to
the mouth of the River Doon, the
purpose of which is to protect
coastal erosion however it also
provides a limited level of flood
protection to the area. There are
similar coastal defences in
Prestwick. These will be maintained,
and will continue to manage flooding
according to the design standard at
the time of construction. An annual
inspection is carried out on all 
01/06/2016-
01/06/2022
The coastal protection structures are
on a scheduled inspection and
maintenance programme. 
The Council will continue to inspect
and maintain the flood protection
structures within the catchment. 
N/A. 
Maintain flood
warning 
Ayr Seafield and
Prestwick Links
G
SEPA will continue to maintain the
Ayr Seafield the Prestwick Links
Road flood warning areas which are 
SEPA has continued to operate the
flood warning service.
N/A
DRAFT
Appendix 1

Page 113

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 107
Road flood warning
areas
part of the Firth of Clyde coastal
flood warning scheme. When flood
events occur in an area with a flood
warning service, SEPA will seek to
verify and validate the warning
service. SEPA will use feedback and
post-event data to ensure that our
flood warning service is timely and
accurate.
22/12/2015
-
22/06/2022 
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
22/12/2015
-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
N/A
DRAFT
Appendix 1

Page 114

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 108
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
01/04/2016-
22/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions.
Ongoing community support, PLP
training, Flood Warden and
resilience group promotion. 
DRAFT
Appendix 1

Page 115

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 109
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council’s Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA’s
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate.
N/A. 
DRAFT
Appendix 1

Page 116

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 110
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are known
flood risk issues. 25km of coastal
protection structures are inspected
annually. 
The Council will continue to inspect
and maintain watercourses, screens
and other relevant Council assets.
N/A. 
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
01/06/2016-
01/06/2022
For South Ayrshire Council, the
Ayrshire Civil Contingencies maintain
and update all emergency response
plans. These are updated every 3
years or as required after an incident.
This is done in conjunction with the
N/A. 
DRAFT
Appendix 1

Page 117

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 111
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations. 
relevant department and external
agency. 
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
response may be supported by the
work of voluntary organisations. 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
N/A.
DRAFT
Appendix 1

Page 118

Prestwick to Ayr (Potentially Vulnerable Area 12/09) 112 
Planning policies 
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022. 
DRAFT
Appendix 1

Page 119

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 113
4.10 Pow Burn Catchment (Potentially Vulnerable Area 12/10) 
Local Plan District  Local authority  Main catchment 
Ayrshire  South Ayrshire Council  Pow Burn 
Summary of Progress for Pow Burn Catchment 
There are approximately 410 residential properties at risk of flooding. The Annual Average
Damages are approximately £940,000. Further information can be found in the Ayrshire Local FRMP under
PVA 12/01, please click here. 
The Meadowhead Integrated Catchment study and Surface Water Management Plans for Ayr and Prestwick
are complete. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Pow Burn Catchment 
DRAFT
Appendix 1

Page 120

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 114
Summary of progress of actions to manage flood risk in the Pow Burn Catchment (PVA
12/10) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
New Flood
Warning
G
The area under consideration
includes properties in Prestwick
affected by flooding from the Pow
Burn. Further feasibility assessment
will be required to assess the
delivery potential of a flood warning
scheme in this location.
01/01/2016-
31/12/2016
Action not progressed (action not
going ahead after initial scoping).
N/A
Surface water
plan/study 
G
An integrated catchment study
covering the Meadowhead
catchment was carried out in SR10
(2010-2015). This study will help to
support the surface water
management planning process in
Kilmarnock, Greenholm, Irvine,
Prestwick and Ayr. The study has
improved knowledge and
understanding of flood risk and
interactions between the above
ground and below ground drainage
network e.g. with the sewer network
and watercourses. The Optioneering
01/06/2016-
01/06/2022
Pre Optioneering Catchment Plan and
prioritisation stages completed. The
Optioneering Phase was completed in
June 2021. 
The implementation of the findings are
currently being considered in
coordination with Scottish Water.
N/A. 
DRAFT
Appendix 1

Page 121

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 115
phase of this study, to establish the
preferred solution(s) to the flooding
issues, is now being progressed. 
Surface water
plan/study 
G
South Ayrshire Council will develop
a surface water management plan
or plans to cover Prestwick and Ayr
which set objectives for the
management of surface water flood
risk and identify the most
sustainable actions to achieve the
objectives.
01/06/2016-
01/06/2022
The Surface water management Plan
for South Ayrshire Council catchments
was completed in November 2021.
The implementation of the findings will
be considered in the next cycle of FRM
Plan
N/A. 
Strategic mapping
and modelling 
A
SEPA will seek to incorporate
additional surface water data into
the flood maps to improve
understanding of flood risk.
Approximately 1,300km² of
improved surface water data is
currently available within this Local
Plan District. 
01/06/2016-
01/06/2022 
SEPA's current Surface water hazard
maps use design rainfall estimates
based on FEH99 methodology, this
has now been superseded by FEH22
methodology. The FEH22 dataset
contains the latest science and
understanding of rainfall across
Scotland and represents a significant
change in rainfall amounts compared
to FEH99 dataset, as such it is no
longer consider appropriate to deliver
this action as originally intended.  This
action will not be taken forwards as
described. A major national update of
the surface water maps is underway
The national surface water
flooding modelling project will be
completed in 2023.  The outputs
from this will be used to update
SEPA maps early in cycle 2 and
will inform SEPA's flood risk
assessments for  the next flood
risk management cycle.
DRAFT
Appendix 1

Page 122

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 116
which will deliver updated surface
water flooding maps for Scotland
representing the latest scientific
understanding.  
Strategic mapping
and modelling
Section 16
Assessment 
Scottish Water will undertake further
investigation and modelling in the
Meadowhead sewer catchment to
improve knowledge and
understanding of flood risk in this
area and as required under Section
16 of the Flood Risk Management
(Scotland) Act 2009.
01/01/2016-
31/12/2020
The Meadowhead ICS has been
completed. No areas within this PVA
were included to be taken forwards for
optioneering as priority areas under
the ICS. 
New flood warning 
Prestwick
G
The potential benefits and feasibility
of a new flood warning scheme for
the Pow Burn in Prestwick will be
assessed in 2016.
01/01/2016
– 2017
Scoping was completed by SEPA in
2017. Actions carried out along the
Pow Burn meant that a new flood
warning scheme was no longer
beneficial. This decision was
discussed and agreed with the local
authority.
No further actions will be carried
out.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
N/A
DRAFT
Appendix 1

Page 123

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 117
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
01/06/2016-
22/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions.
Ongoing community PLP training,
Flood Warden and resilience
group promotion.
DRAFT
Appendix 1

Page 124

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 118
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council’s Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
Awareness raising is a continuous
activity for South Ayrshire Council
N/A. 
DRAFT
Appendix 1

Page 125

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 119
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA’s
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are known
flood risk issues. 25km of coastal
protection structures are inspected
annually. 
N/A. 
DRAFT
Appendix 1

Page 126

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 120
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
The Council will continue to inspect
and maintain watercourses, screens
and other relevant Council assets.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations. 
01/06/2016-
01/06/2022
For South Ayrshire Council, the
Ayrshire Civil Contingencies maintain
and update all emergency response
plans. These are updated every 3
years or as required after an incident.
This is done in conjunction with the
relevant department and external
agency. 
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
response may be supported by the
work of voluntary organisations.
N/A. 
DRAFT
Appendix 1

Page 127

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 121
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
N/A.
DRAFT
Appendix 1

Page 128

Pow Burn Catchment (Potentially Vulnerable Area 12/10) 122
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022 
DRAFT
Appendix 1

Page 129

River Ayr (Potentially Vulnerable Area 12/11)) 123
4.11 River Ayr (Potentially Vulnerable Area 12/11) 
Local Plan District  Local authority  Main catchment 
Ayrshire  South Ayrshire Council  River Ayr 
Summary of Progress for River Ayr 
There are approximately 90 residential properties at risk of flooding. The Annual Average Damages are
approximately £72,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/11, please
click here. 
The Meadowhead Integrated Catchment study and Surface Water Management Plans for Ayr and Prestwick
are complete, which has identified surface water flood risk in the area. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in River Ayr 
DRAFT
Appendix 1

Page 130

River Ayr (Potentially Vulnerable Area 12/11)) 124
Summary of progress of actions to manage flood risk in the River Ayr (PVA 12/11) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
New flood warning
River Ayr 
G
The area under consideration for a
new flood warning includes
properties affected by flooding from
the River Ayr. Full scoping,
infrastructure and a flood forecasting
system will be required before a
flood warning service can be
delivered in this area. Communities
that will benefit from a warning will
be identified during development of
the scheme.
01/06/2016-
30/09/2018
A new flood warning service for the
River Ayr has been delivered, with
three new flood warning areas
provided in Sorn, Catrine and Failford.
SEPA has continued to operate the
flood warning service since it was
completed.
N/A
Surface water
plan/study 
G
An integrated catchment study
covering the Meadowhead
catchment was carried out in SR10
(2010-2015). This study will help to
support the surface water
management planning process in
Kilmarnock, Greenholm, Irvine,
Prestwick and Ayr. The study has
improved knowledge and
understanding of flood risk and
interactions between the above
01/06/2016-
01/06/2022
Pre Optioneering Catchment Plan and
prioritisation stages completed. The
Optioneering Phase was completed in
June 2021. 
The implementation of the findings are
currently being considered in
coordination with Scottish Water.
N/A. 
DRAFT
Appendix 1

Page 131

River Ayr (Potentially Vulnerable Area 12/11)) 125
ground and below ground drainage
network e.g. with the sewer network
and watercourses. The Optioneering
phase of this study, to establish the
preferred solution(s) to the flooding
issues, is now being progressed. 
Surface water
plan/study 
G
South Ayrshire Council will develop
a surface water management plan
or plans to cover Prestwick and Ayr
which set objectives for the
management of surface water flood
risk and identify the most
sustainable actions to achieve the
objectives.
01/06/2016-
01/06/2022
The Surface water management Plan
for South Ayrshire Council catchments
was completed in November 2021.
The implementation of the findings will
be considered in the next cycle of FRM
Plan.
N/A.
Strategic mapping
and modelling 
G
Scottish Water will undertake further
investigation and modelling in the
Meadowhead sewer catchment to
improve knowledge and
understanding of flood risk in this
area and as required under Section
16 of the Flood Risk Management
(Scotland) Act 2009.
01/01/2016-
31/12/2020 
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed.
The assessment is now
completed and has been shared
with Local Authority.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
N/A
DRAFT
Appendix 1

Page 132

River Ayr (Potentially Vulnerable Area 12/11)) 126
guidance statements which are
issued to Category 1 and 2
Responders. The service
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
DRAFT
Appendix 1

Page 133

River Ayr (Potentially Vulnerable Area 12/11)) 127
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
01/04/2016-
22/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions.
Ongoing community PLP training,
Flood Warden and resilience
group promotion.
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
N/A. 
DRAFT
Appendix 1

Page 134

River Ayr (Potentially Vulnerable Area 12/11)) 128
officers from the Council’s Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA’s
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
joint events have been limited or
delayed due to Covid 19. 
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are known
N/A. 
DRAFT
Appendix 1

Page 135

River Ayr (Potentially Vulnerable Area 12/11)) 129
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
flood risk issues. 25km of coastal
protection structures are inspected
annually. 
South Ayrshire Council will continue to
maintain watercourses, screens and
other relevant Council assets. 
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
01/06/2016-
01/06/2022
For South Ayrshire Council, the
Ayrshire Civil Contingencies maintain
and update all emergency response
plans. These are updated every 3
years or as required after an incident.
This is done in conjunction with the
relevant department and external
agency. 
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
N/A.
DRAFT
Appendix 1

Page 136

River Ayr (Potentially Vulnerable Area 12/11)) 130
supported by the work of voluntary
organisations. 
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
response may be supported by the
work of voluntary organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
N/A.
DRAFT
Appendix 1

Page 137

River Ayr (Potentially Vulnerable Area 12/11)) 131
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022.
DRAFT
Appendix 1

Page 138

Ayr East (Potentially Vulnerable Area 12/12) 132
4.12 Ayr East (Potentially Vulnerable Area 12/12) 
Local Plan District  Local authority  Main catchment 
Ayrshire  South Ayrshire Council  River Ayr 
Summary of Progress for Ayr East 
There are approximately 290 residential properties at risk of flooding. The Annual Average Damages are
approximately £720,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/12, please
click here. 
The Meadowhead Integrated Catchment study and Surface Water Management Plans for Ayr and Prestwick
are complete. A new 'Ayr to Troon' flood warning area was added to the existing Firth of Clyde coastal flood
warning scheme. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Ayr East 
DRAFT
Appendix 1

Page 139

Ayr East (Potentially Vulnerable Area 12/12) 133
Summary of progress of actions to manage flood risk in the Ayr East (PVA 12/12) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Strategic mapping
and modelling 
A
SEPA will update strategic coastal
mapping in the Ayr to Ardrossan
area to improve understanding of
flood risk. The extent and timing of
improvements will depend on
detailed scoping and data
availability. Where this work
coincides with local authority
studies, SEPA will work
collaboratively to ensure consistent
modelling approaches are applied.
The coastal mapping and modelling
process will start in 2016, with early
work focussing on methodology
development and data collection.
Once this stage has been completed
a thorough review will be carried out
to identify the final mapping
improvements that can be made in
the area. 
01/01/2016-
31/12/2018 
Work completed to date includes the
production of key data sets including
extreme water levels and offshore
wave and wind conditions to support
future coastal modelling work.
Although this work has not been
completed to the timescale described
in the plan, the work that will be
progressed will deliver a more
comprehensive update of the coastal
flood hazard maps across the whole
area.          
SEPA will complete a review of
coastal flood hazard mapping in
south west Scotland including in
this area. This includes identifying
where taking account of the
impact of waves on flooding from
the sea may be required. SEPA
will collect the required coastal
defence asset and other
information necessary to progress
with improved flood modelling and
mapping in the highest priority
areas taking account of wave
overtopping where required.
SEPA will look for opportunities to
progress future modelling work in
a way that best supports
improvements to SEPA’s Coastal
Flood Warning Schemes.
Expected to progress to the next
stage around the middle of cycle
DRAFT
Appendix 1

Page 140

Ayr East (Potentially Vulnerable Area 12/12) 134
2 and complete early in the
following cycle, subject to funding.   
Strategic mapping
and modelling
Section 16
Assessment 
Scottish Water will undertake further
investigation and modelling in the
Meadowhead sewer catchment to
improve knowledge and
understanding of flood risk in this
area and as required under Section
16 of the Flood Risk Management
(Scotland) Act 2009.
01/01/2016-
31/12/2020
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed.
The assessment is now
completed and has been shared
with Local Authority.
Maintain Flood
Warning
Ayr Seafield flood
warning area
G
SEPA will continue to maintain the
Ayr Seafield flood warning area
which is part of the Firth of Clyde
coastal flood warning scheme.
When flood events occur in an area
with a flood warning service, SEPA
will seek to verify and validate the
warning service. SEPA will use
feedback and post-event data to
ensure that our flood warning
service is timely and accurate.
22/12/2015-
22/06/2022
SEPA has recently reviewed and
recalibrated the Firth of Clyde flood
forecasting model. SEPA has
continued to maintain the Ayr Seafield
flood warning area within a new 'Ayr to
Troon' flood warning area which is part
of the Firth of Clyde coastal flood
warning scheme.
SEPA will continue to operate the
flood warning service.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
N/A
DRAFT
Appendix 1

Page 141

Ayr East (Potentially Vulnerable Area 12/12) 135
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
01/06/2016-
22/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys
and appropriate and relevant
Ongoing community PLP training,
Flood Warden and resilience
group promotion.
DRAFT
Appendix 1

Page 142

Ayr East (Potentially Vulnerable Area 12/12) 136
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
information to enable clients to make
the right decisions.
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council’s Flood
Risk Management Team attend
community council events to discuss
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
N/A. 
DRAFT
Appendix 1

Page 143

Ayr East (Potentially Vulnerable Area 12/12) 137
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA’s
flood forecasting and warning
services (Floodline). Scottish Water
will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are known
flood risk issues. 25km of coastal
protection structures are inspected
annually.
N/A.
DRAFT
Appendix 1

Page 144

Ayr East (Potentially Vulnerable Area 12/12) 138
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
South Ayrshire Council will continue to
inspect and maintain watercourses,
screens and other relevant Council
assets.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
01/06/2016-
01/06/2022
For SAC Ayrshire Civil Contingencies
maintain and update all emergency
response plans. These are updated
every 3 years or as required after an
incident. This is done in conjunction
with the relevant department and
external agency. 
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
N/A. 
DRAFT
Appendix 1

Page 145

Ayr East (Potentially Vulnerable Area 12/12) 139
response may be supported by the
work of voluntary organisations.  
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
N/A.
DRAFT
Appendix 1

Page 146

Ayr East (Potentially Vulnerable Area 12/12) 140
via the National Planning Framework
4, we will take the same approach. 
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022. 
DRAFT
Appendix 1

Page 147

Ayr South (Potentially Vulnerable Area 12/13) 141
4.13 Ayr South (Potentially Vulnerable Area 12/13) 
Local Plan District  Local authority  Main catchment 
Ayrshire  South Ayrshire Council  River Doon 
Summary of Progress for Ayr South 
There are approximately 20 residential properties at risk of flooding. The Annual Average Damages are
approximately £40,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/13, please
click here. 
Throughout the period South Ayrshire Council have carried out inspection and maintenance works at known
high flood risk locations such as debris screens and small culverts. 
The Meadowhead Integrated Catchment study and Surface Water Management Plans for Ayr and Prestwick
are complete.  © Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Ayr South 
DRAFT
Appendix 1

Page 148

Ayr South (Potentially Vulnerable Area 12/13) 142
Summary of progress of actions to manage flood risk in the Ayr South (PVA 12/13) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Strategic mapping
and modelling
Section 16
Assessment
G
Scottish Water will undertake further
investigation and modelling in the
Meadowhead sewer catchment to
improve knowledge and
understanding of flood risk in this
area and as required under Section
16 of the Flood Risk Management
(Scotland) Act 2009.
01/01/2016-
31/12/2020
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed.
The assessment is now completed
and has been shared with Local
Authority.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
N/A
DRAFT
Appendix 1

Page 149

Ayr South (Potentially Vulnerable Area 12/13) 143 
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
01/06/2016-
22/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions.
Ongoing community PLP training,
Flood Warden and resilience group
promotion.
DRAFT
Appendix 1

Page 150

Ayr South (Potentially Vulnerable Area 12/13) 144
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council’s Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate.
N/A.
DRAFT
Appendix 1

Page 151

Ayr South (Potentially Vulnerable Area 12/13) 145
activity and promotion of SEPA’s
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are known
flood risk issues. 
South Ayrshire Council will continue to
inspect and maintain watercourses,
screens and other relevant Council
Assets.
N/A. 
DRAFT
Appendix 1

Page 152

Ayr South (Potentially Vulnerable Area 12/13) 146
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
01/06/2016-
01/06/2022
For South Ayrshire Council, the
Ayrshire Civil Contingencies maintain
and update all emergency response
plans. These are updated every 3
years or as required after an incident.
This is done in conjunction with the
relevant department and external
agency. 
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
response may be supported by the
work of voluntary organisations.
N/A. 
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
N/A.
DRAFT
Appendix 1

Page 153

Ayr South (Potentially Vulnerable Area 12/13) 147
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
DRAFT
Appendix 1

Page 154

Ayr South (Potentially Vulnerable Area 12/13) 148
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022. 
DRAFT
Appendix 1

Page 155

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 149
4.14 Cumnock and Catrine (Potentially Vulnerable Area 12/14) 
Local Plan District  Local authority  Main catchment 
Ayrshire  East Ayrshire Council  River Ayr 
Summary of Progress for Cumnock and Catrine 
There are approximately 330 residential properties and 240 non-residential properties at risk of flooding. The
Annual Average Damages are approximately £970,000. Further information can be found in the Ayrshire Local
FRMP under PVA 12/14, please click here. 
Key progress has been made with the installation of River Monitors on the Lugar and Glaisnock Waters.  These
are being used in conjunction with the SEPA monitor on the River Ayr at Catrine, to gather hydraulic data to
inform the planned combined Flood study (2020 -2023) for these watercourses. The Flood study will inform
Cycle 2 flooding actions for these locations.  © Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Cumnock and Catrine 
DRAFT
Appendix 1

Page 156

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 150
Summary of progress of actions to manage flood risk in the Cumnock and Catrine (PVA
12/14) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
study 
A
A study will investigate the feasibility
of a flood protection scheme along
the River Ayr at Sorn/Catrine and
further investigate any measures
required in Cumnock.
01/06/2016-
22/06/2022
Progress has been made with the
installation of River Monitors on the
Lugar and Glaisnock Waters.  These
are being used in conjunction with the
SEPA monitor on the River Ayr at
Catrine, to gather hydraulic data to
inform the planned combined Flood
study (2020 -2022) for these
watercourses. The Flood study will
inform Cycle 2 flooding actions for
these locations.
Additional resourcing is required
in order procure these works out
to tender. These works are
expected to progress on
schedule. 
Strategic mapping
and modelling 
A
SEPA will seek to incorporate
additional surface water data into
the flood maps to improve
understanding of flood risk.
Approximately
1,300km² of improved surface water
data is currently available within this
Local Plan District.
01/06/2016-
22/06/2022
SEPA's current Surface water hazard
maps use design rainfall estimates
based on FEH99 methodology, this
has now been superseded by FEH22
methodology. The FEH22 dataset
contains the latest science and
understanding of rainfall across
Scotland and represents a significant
change in rainfall amounts compared
to FEH99 dataset, as such it is no
The national surface water
flooding modelling project will be
completed in 2023.  The outputs
from this will be used to update
SEPA maps early in cycle 2 and
will inform SEPA's flood risk
assessments for  the next flood
risk management cycle.
DRAFT
Appendix 1

Page 157

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 151
longer consider appropriate to deliver
this action as originally intended.  This
action will not be taken forwards as
described. A major national update of
the surface water maps is underway
which will deliver updated surface
water flooding maps for Scotland
representing the latest scientific
understanding.  
Strategic mapping
and modelling -
Section 16
assessment
G Scottish Water will undertake further
investigation and modelling in the
Catrineholm and Underwood
Cumnock sewer catchment to
improve knowledge and
understanding of flood risk in this
area as required under Section 16 of
the Flood Risk Management
(Scotland) Act 2009.
01/01/2016-
31/12/2019
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed.
The assessment is now
completed and has been shared
with Local Authority.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
N/A
DRAFT
Appendix 1

Page 158

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 152
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Property level
protection scheme 
G
East Ayrshire Council is currently
procuring suitable flow and level
monitoring installations on
appropriate watercourses identified
for studies, with the intention of
informing those studies in areas
01/06/2016-
22/06/2022
The Flood Study for the River Ayr for
Catrine and Lugar and Glaisnock in
Cumnock informed property level
protection requirements for the area
and the monitors will form the basis for
N/A. 
DRAFT
Appendix 1

Page 159

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 153
known to have little or no
information currently available.
Information gaps and proposed
locations are being identified in co-
operation with SEPA. Once this in
place the Flood Study for the River
Ayr will inform any property level
protection requirements for the area
and the monitors will form the basis
for a Flood Warning scheme to
support the placement.
a Flood Warning scheme to support
the placement.
East Ayrshire Council made PLP
available to all residents in EAC, who
would benefit from there use, and will
continue to do so.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline.
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
01/04/2016-
22/06/2022
Community Engagement included,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions.
Ongoing community PLP training,
Flood Warden and resilience group
promotion will continue to be
supported. 
N/A. 
DRAFT
Appendix 1

Page 160

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 154
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
East Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared.
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA's
flood forecasting and warning
services (Floodline).
Scottish Water will provide targeted
flooding communications for
Scottish Water specific activities and
raise awareness by producing and
supplying targeted information to the
public on large capital projects and
detailed local studies.
Further Information is provided on
East Ayrshire Council, SEPA,
01/04/2016-
22/06/2022
Ayr & Annick Flood Warning Scheme,
which includes the communities of
Catrine and Sorn, launched in 2020. It
was a soft launch due to Covid-19
pandemic but awareness raising to
promote the new service was carried
out in February 2022. 
Ayr & Annick Flood Warning Scheme,
which includes the communities of
Catrine and Sorn, launched in 2020. It
was a soft launch due to Covid-19
pandemic but awareness raising to
promote the new service was carried
out in February 2022. 
East Ayrshire Council and SEPA has
delivered a range of awareness raising
activities through campaigning,
education activities and partnership
delivery. We have run national and
local digital and direct engagement
campaigns to raise awareness of flood
East Ayrshire Council and SEPA
will continue to raise awareness
of flood risk through campaigning,
developing education and
engagement tools, creating new
partnerships and improving the
flood warning and forecasting
service.  Many of our awareness
raising activities currently
underway will continue.  Our
focus will be on promoting flood
warning and forecasting service,
innovation, education and
engagement with partners,
customers and the public.
DRAFT
Appendix 1

Page 161

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 155
Scottish Water and Ayrshire Road
Alliance websites.
risk and SEPA’s flood warning service,
Floodline. We publish and publicise an
electronic newsletter (Flooding
Gateway) four times a year which is
distributed to a wide audience. SEPA
are working with Education Scotland
and Scottish Government Resilience
team to embed flooding awareness
within the Curriculum for Excellence,
and resilience partners in Safer
Communities programmes. We have
also developed an online tool that
helps everyone share information on
current flooding issues (Report-a-
Flood). We have worked in partnership
with local authorities, emergency
services and community organisations
(e.g. Neighbourhood Watch Scotland,
Citizens Advice Scotland and others)
to share our resources and help to
promote preparedness and
understanding of how we manage
flood risk in Scotland. We have
actively supported the Scottish Flood
Forum and worked closely with UK
agencies to develop joint flooding
information.
DRAFT
Appendix 1

Page 162

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 156
Maintenance 
G
East Ayrshire Council in accordance
with Section 18 of the Flood
Risk Management (Scotland) Act
2009 undertake assessment of
water bodies to determine whether
works of clearance and repair
would substantially reduce the risk
of flooding. This information is
used to produce a schedule of
works which is available for the
public
to inspect.
01/04/2016-
22/06/2022
High risk locations such as those with
screens and some smaller culverts
were inspected on a scheduled basis.
The majority of inspections tended to
be undertaken in the winter months
when flows are higher, and leaves and
other waterborne debris can be an
issue.
Works of clearance were carried out
during these inspections which
are not specifically "scheduled". The
main water bodies, and other
water bodies, within urban areas were
subject to an annual visual
inspection and any works were
undertaken where it would be
expedient and in the interests of good
flood risk management to do so.   
East Ayrshire Council will continue to
inspect and maintain watercourses,
screens and other relevant Council
assets.
N/A. 
Emergency
plans/response 
G
The Civil Contingencies Team
ensures that the Council will be able
to respond speedily and effectively
in a major emergency. North,
01/04/2016-
22/06/2022
Emergency Response Planning is
carried out by Ayrshire Civil
Contingencies Team (ACCT) this is an
all Ayrshire shared service. ACCT
N/A. 
DRAFT
Appendix 1

Page 163

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 157
South and East Ayrshire teams are
a shared service team known as the
Ayrshire Civil Contingencies Team.
If disaster strikes, or if emergencies
develop in Ayrshire, communities
will look to the Council for support
and advice. The Ayrshire Civil
Contingencies Team ensures that
the Council will be able to respond
speedily and effectively in a major
emergency in accordance with the
Civil
Contingencies Act 2004
(Contingency Planning) (Scotland)
Regulations 2005. Our
responsibilities include preparing
comprehensive and robust
contingency plans and procedures
irrespective of the nature of the
emergency. The main aim is to
preserve life and property. Every
emergency plan also sets out to:
Mitigate the harmful effects of the
emergency on the environment;
bring about a swift return to normal
life in the communities and
environment affected; and
update and co-ordinate (all Emergency
Responders) the emergency response
plans (ERP) as required (in direct
consultation with ARA, where
appropriate). In addition to the ERP,
EAC has implemented a system of
river monitors in known areas and a
rota of Flood Scouts (FS) is
maintained who are tasked to monitor
and report back on status on receipt of
any alarm.
Providing an emergency response to
flooding is the responsibility of many
organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act 2004
by Category 1 and 2 Responders.
Scottish Water are a Category 2
responder under the Civil
Contingencies Act 2004 and will
support regional and local resilience
partnerships as required. The
emergency response by these
organisations is coordinated through
DRAFT
Appendix 1

Page 164

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 158
encourage all agencies and
organisations to prepare for their
role.
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
22/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
N/A. 
DRAFT
Appendix 1

Page 165

Cumnock and Catrine (Potentially Vulnerable Area 12/14) 159
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
East Ayrshire Council has prepared
and consulted on its Proposed Plan
LDP2. As part of the preparation of the
Plan, the Council engaged early with
SEPA on sites it was considering
allocating and took on board
comments from SEPA. In addition, The
Council has worked extensively with
SEPA and the KAG on issues
pertaining to flooding in Kilmarnock
and has undertaken a series of flood
workshops with the Key Agencies. The
new proposed plan contains flood
policies reflective of SEPA’s stance
and of NPF4.   
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making.
DRAFT
Appendix 1

Page 166

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 160
4.15 Dalrymple and Patna (Potentially Vulnerable Area 12/15) 
Local Plan District  Local authority  Main catchment 
Ayrshire  East Ayrshire Council, South Ayrshire Council River Doon 
Summary of Progress for Dalrymple and Patna 
There are approximately 90 residential properties at risk of flooding. The Annual Average Damages are
approximately £120,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/15, please
click here. 
Key progress has been made with the installation of River Monitors on the Taiglum and Primpton Burns and
on the River Doon at Dalrymple Bridge, to gather hydraulic data to inform the completed combined Flood study
(2020 -2022) for these watercourses. The Flood study has informed Cycle 2 flooding actions for these locations. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Dalrymple and Patna 
DRAFT
Appendix 1

Page 167

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 161
Summary of progress of actions to manage flood risk in the Dalrymple and Patna (PVA
12/15) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay 
Flood protection
study
G
A study will investigate the feasibility
of a flood protection scheme,
including modification of
conveyance through a historic
bridge and Construction of direct
defences. The study will also
examine the current operating
procedure of Loch Doon to increase
the level of storage, this will be
carried out in coordination with
Scottish Power
01/06/2016-
22/06/2022
Progress has been made with the
installation of River Monitors on the
Taiglum and Primpton Burns and the
River Doon, to gather hydraulic data to
inform the completed combined Flood
study (2020 -2022) for these
watercourses. The Flood study will
inform Cycle 2 flooding actions for
these locations.
Additional resourcing was required in
order to procure these works. 
This study has now been completed.
The anticipated rescheduling is not
envisaged to affect the ability to report
as intended in Cycle 2. 
N/A. 
Strategic mapping
and modelling 
Pluvial mapping
updates
A
SEPA will seek to incorporate
additional surface water data into
the
01/01/2016-
31/12/2016
SEPA's current Surface water hazard
maps use design rainfall estimates
based on FEH99 methodology, this
has now been superseded by FEH22
methodology. The FEH22 dataset
The national surface water
flooding modelling project will be
completed in 2023.  The outputs
from this will be used to update
SEPA maps early in cycle 2 and
DRAFT
Appendix 1

Page 168

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 162
flood maps to improve
understanding of flood risk.
Approximately
1,300km² of improved surface water
data is currently available within this
Local Plan District.
contains the latest science and
understanding of rainfall across
Scotland and represents a significant
change in rainfall amounts compared
to FEH99 dataset, as such it is no
longer consider appropriate to deliver
this action as originally intended.  This
action will not be taken forwards as
described. A major national update of
the surface water maps is underway
which will deliver updated surface
water flooding maps for Scotland
representing the latest scientific
understanding.  
will inform SEPA's flood risk
assessments for the next flood
risk management cycle.
Maintain flood
protection
scheme* 
G
An existing overflow channel on the
Primpton Burn reduces the flood risk
from the watercourse. The Council
should investigate the current
benefit which is offered by the
scheme. This channel will be
maintained, and will continue to
manage flooding according to the
design standard at the time of
construction. Levels of flood risk are
likely to increase over time as a
consequence of climate change.
01/06/2016-
22/06/2022
Local authorities have a duty to assess
watercourses and carry out clearance
and repair works where such works
would substantially reduce flood risk.
They produce schedules of clearance
and repair works and make these
available for public inspection. Scottish
Water undertake risk based inspection,
maintenance and repair on the public
sewer network. Asset owners and
riparian landowners are responsible for
the maintenance and management of
N/A. 
DRAFT
Appendix 1

Page 169

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 163
The Primpton Burn is particularily
prone to high water levels in the
River Doon. East Ayrshire
Council/ACCT have held meetings
with Scottish Power to liaison on the
operating protocols of the Doon
Dam. Scottish Power have agreed
to release more water earlier to
mitigate against the need to open
the gates only in an emergency.
This earlier release is intended to
lessen the impact during heavy
rainfall events. This section of the
Doon is an area that has been
I identified for a future study (2016-
2021) to establish any further works
required here.
their own assets including those which
help to reduce flood risk. 
The Council will continue to inspect
and maintain the flood protection
structures within the Catchment.
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
N/A
DRAFT
Appendix 1

Page 170

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 164
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website.
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
01/06/2016-
22/06/2022
Community Engagement included,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions.
Responsible Authorities shall continue
to provide ongoing community PLP
N/A. 
DRAFT
Appendix 1

Page 171

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 165
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
training, Flood Warden and resilience
group promotion.
Awareness raising 
G
East Ayrshire Council, South
Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared.
01/06/2016-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
East Ayrshire Council and SEPA has
delivered a range of awareness raising
activities through campaigning,
education activities and partnership
N/A.
DRAFT
Appendix 1

Page 172

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 166
delivery. We have run national and
local digital and direct engagement
campaigns to raise awareness of flood
risk and SEPA’s flood warning service,
Floodline. We publish and publicise an
electronic newsletter (Flooding
Gateway) four times a year which is
distributed to a wide audience. SEPA
are working with Education Scotland
and Scottish Government Resilience
team to embed flooding awareness
within the Curriculum for Excellence,
and resilience partners in Safer
Communities programmes. We have
also developed an online tool that
helps everyone share information on
current flooding issues (Report-a-
Flood). We have worked in partnership
with local authorities, emergency
services and community organisations
(e.g. Neighbourhood Watch Scotland,
Citizens Advice Scotland and others)
to share our resources and help to
promote preparedness and
understanding of how we manage
flood risk in Scotland. We have
actively supported the Scottish Flood
DRAFT
Appendix 1

Page 173

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 167
Forum and worked closely with UK
agencies to develop joint flooding
information. 
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate.
Maintenance 
G
East Ayrshire Council in accordance
with Section 18 of the Flood Risk
Management (Scotland) Act 2009
undertake assessment of water
bodies to determine whether works
of clearance and repair would
substantially reduce the risk of
flooding. This information is used to
produce a schedule of works which
is available for the public to inspect.
01/06/2016-
22/06/2022
High risk locations such as those with
screens and some smaller culverts
were inspected on a scheduled basis.
The majority of
inspections tended to be undertaken in
the winter months when flows are
higher, and leaves and other
waterborne debris can be an issue.
Works of clearance were carried out
during these inspections which are not
specifically "scheduled". The main
water bodies, and other water bodies,
within urban areas were subject to an
annual visual inspection and any
works were undertaken where it would
be expedient and in the interests of
good flood risk management to do so.  
N/A. 
DRAFT
Appendix 1

Page 174

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 168
East Ayrshire Council will continue to
inspect and maintain watercourses,
screens and other relevant Council
assets.
Emergency
plans/response 
G
The Civil Contingencies Team
ensures that the Council will be able
to respond speedily and effectively
in a major emergency. North,
South and East Ayrshire teams are
a shared service team known as the
Ayrshire Civil Contingencies Team.
If disaster strikes, or if
emergencies develop in Ayrshire,
communities will look to the
Council for support and advice. The
Ayrshire Civil Contingencies Team
ensures that the Council will be able
to respond speedily and
effectively in a major emergency in
accordance with the Civil
Contingencies Act 2004
(Contingency Planning) (Scotland)
Regulations 2005. Our
responsibilities include preparing
comprehensive and robust
contingency plans and procedures
irrespective of the nature of the
01/06/2016-
22/06/2022
Emergency Response Planning is
carried out by Ayrshire Civil
Contingencies Team (ACCT) this is an
all Ayrshire shared service.
ACCT update and co-ordinate (all
Emergency Responders) the
emergency response plans (ERP) as
required (in direct consultation with
ARA, where appropriate). 
In addition to the ERP EAC has
implemented a system of river
monitors in known areas and a rota of
Flood Scouts (FS). Is maintained who
are tasked to monitor and report back
on status on receipt of any alarm. 
Providing an emergency response to
flooding is the responsibility of many
organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
N/A. 
DRAFT
Appendix 1

Page 175

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 169
emergency. The main aim is to
preserve life and property. Every
emergency plan also sets out to:
Mitigate the harmful effects of the
emergency on the environment;
bring about a swift return to normal
life in the communities and
environment affected; and
encourage all agencies and
organisations to prepare for their
role.
emergency plans that are prepared
under the Civil Contingencies Act 2004
by Category 1 and 2 Responders.
Scottish Water are a Category 2
responder under the Civil
Contingencies Act 2004 and will
support regional and local resilience
partnerships as required. The
emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
N/A. 
DRAFT
Appendix 1

Page 176

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 170
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
East Ayrshire Council has prepared
and consulted on its Proposed Plan
LDP2. As part of the preparation of the
Plan, the Council engaged early with
SEPA on sites it was considering
allocating and took on board
comments from SEPA. In addition, The
Council has worked extensively with
SEPA and the KAG on issues
pertaining to flooding in Kilmarnock
and has undertaken a series of flood
workshops with the Key Agencies. The
new proposed plan contains flood
DRAFT
Appendix 1

Page 177

Dalrymple and Patna (Potentially Vulnerable Area 12/15) 171
policies reflective of SEPA’s stance
and of NPF4.   
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making. 
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022. 
DRAFT
Appendix 1

Page 178

Straiton (Potentially Vulnerable Area 12/16) 172
4.16 Straiton (Potentially Vulnerable Area 12/16) 
Local Plan District  Local authority  Main catchment 
Ayrshire  East Ayrshire Council, South Ayrshire Council Water of Girvan 
Summary of Progress for Straiton 
There are approximately 20 residential properties at risk of flooding. The Annual Average Damages are
approximately £45,000. Further information can be found in the Ayrshire Local FRMP under PVA 12/16, please
click here. 
Key progress has been made with the installation of River Monitors on the Muck Water along with others in the
Doon Valley, to gather hydraulic data to inform the planned combined Flood study (2020-2022) for these
watercourses. The Flood study will inform Cycle 2 flooding actions for these locations 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Straiton 
DRAFT
Appendix 1

Page 179

Straiton (Potentially Vulnerable Area 12/16) 173
Summary of progress of actions to manage flood risk in the Straiton (PVA 12/16) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood forecasting 
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website. 
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
N/A
DRAFT
Appendix 1

Page 180

Straiton (Potentially Vulnerable Area 12/16) 174
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
01/06/2016-
22/06/2022
Community Engagement included,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions. 
Responsible Authorities shall continue
to support Ongoing community PLP
training, Flood Warden and resilience
group promotion.
N/A. 
DRAFT
Appendix 1

Page 181

Straiton (Potentially Vulnerable Area 12/16) 175
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council’s Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA’s
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate.
N/A. 
DRAFT
Appendix 1

Page 182

Straiton (Potentially Vulnerable Area 12/16) 176
public on large capital projects and
detailed local studies. 
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are known
flood risk issues. 
South Ayrshire Council will continue to
inspect and maintain the flood
protection structures within the
Catchment.
N/A. 
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
01/06/2016-
01/06/2022
For SAC Ayrshire Civil Contingencies
maintain and update all emergency
response plans. These are updated
every 3 years or as required after an
incident. This is done in conjunction
with the relevant department and
external agency. 
N/A.
DRAFT
Appendix 1

Page 183

Straiton (Potentially Vulnerable Area 12/16) 177
2004 by Category 1 and 2
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
response may be supported by the
work of voluntary organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
N/A. 
DRAFT
Appendix 1

Page 184

Straiton (Potentially Vulnerable Area 12/16) 178
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
East Ayrshire Council has prepared
and consulted on its Proposed Plan
LDP2. As part of the preparation of the
Plan, the Council engaged early with
SEPA on sites it was considering
allocating and took on board
comments from SEPA. In addition, The
Council has worked extensively with
SEPA and the KAG on issues
pertaining to flooding in Kilmarnock
and has undertaken a series of flood
workshops with the Key Agencies. The
new proposed plan contains flood
DRAFT
Appendix 1

Page 185

Straiton (Potentially Vulnerable Area 12/16) 179
policies reflective of SEPA’s stance
and of NPF4.   
National Planning Framework 4 is
expected to be adopted by the Scottish
Parliament later in 2022 and will
become part of the Development Plan,
ensuring national planning policies on
flooding are applied in local decision
making. 
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022. 
DRAFT
Appendix 1

Page 186

Dailly (Potentially Vulnerable Area 12/17) 180
4.17 Dailly (Potentially Vulnerable Area 12/17) 
Local Plan District  Local authority  Main catchment 
Ayrshire  South Ayrshire Council  Water of Girvan 
Summary of Progress for Dailly 
There are fewer than ten residential properties at risk of flooding. The
Annual Average Damages are approximately £38,000. Further information can be found in the Ayrshire Local
FRMP under PVA 12/17, please click here. 
Throughout the reporting period South Ayrshire Council have carried out inspection and maintenance works at
known high flood risk locations such as debris screens and small culverts. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Dailly 
DRAFT
Appendix 1

Page 187

Dailly (Potentially Vulnerable Area 12/17) 181
Summary of progress of actions to manage flood risk in the Dailly (PVA 12/17) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
information please visit SEPA’s
website. 
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
N/A
DRAFT
Appendix 1

Page 188

Dailly (Potentially Vulnerable Area 12/17) 182
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
01/06/2016-
22/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions. 
Ongoing community PLP training,
Flood Warden and resilience group
promotion.
N/A. 
DRAFT
Appendix 1

Page 189

Dailly (Potentially Vulnerable Area 12/17) 183
found in the Councils and Scottish
Flood Forum websites.
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council’s Flood
Risk Management Team attend
community council events to discuss
elements of flood risk management.   
Across Scotland, SEPA will create
and share communication and
education resources with other
responsible authorities. These
resources will include awareness
campaigns, media and marketing
activity and promotion of SEPA’s
flood forecasting and warning
services (Floodline).    Scottish
Water will provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to the
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
partners and engagement with
relevant stakeholders as appropriate. 
N/A. 
DRAFT
Appendix 1

Page 190

Dailly (Potentially Vulnerable Area 12/17) 184
public on large capital projects and
detailed local studies
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available for
public inspection. Scottish Water
undertake risk based inspection,
maintenance and repair on the
public sewer network. Asset owners
and riparian landowners are
responsible for the maintenance and
management of their own assets
including those which help to reduce
flood risk.
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a
regular basis where there are known
flood risk issues. 
South Ayrshire Council will continue to
inspect and maintain watercourses,
screens and other relevant Council
assets.
N/A. 
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency services
and SEPA. Effective management of
an emergency response relies on
emergency plans that are prepared
under the Civil Contingencies Act
2004 by Category 1 and 2
01/06/2016-
01/06/2022
For South Ayrshire Council, the
Ayrshire Civil Contingencies maintain
and update all emergency response
plans. These are updated every 3
years or as required after an incident.
This is done in conjunction with the
relevant department and external
agency. 
DRAFT
Appendix 1

Page 191

Dailly (Potentially Vulnerable Area 12/17) 185
Responders. Scottish Water are a
Category 2 responder under the
Civil Contingencies Act 2004 and
will support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated through
regional and local resilience
partnerships. This response may be
supported by the work of voluntary
organisations.
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
response may be supported by the
work of voluntary organisations.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
N/A. 
DRAFT
Appendix 1

Page 192

Dailly (Potentially Vulnerable Area 12/17) 186
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022. 
DRAFT
Appendix 1

Page 193

Girvan (Potentially Vulnerable Area 12/18) 187
4.18 Girvan (Potentially Vulnerable Area 12/18) 
Local Plan District  Local authority  Main catchment 
Ayrshire  South Ayrshire Council  Girvan to Lendalfoot coastal 
Summary of Progress for Girvan 
There are approximately 110 residential properties at risk of flooding. The Annual
Average Damages are approximately £220,000. Further information can be found in the Ayrshire Local FRMP
under PVA 12/18, please click here. 
The Ayrshire Shoreline Management Plan has been completed and adopted by both North and South Ayrshire
Councils in September/October 2018.
The Mill Burn and Girvan Water Flood Study has been completed. 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Girvan 
DRAFT
Appendix 1

Page 194

Girvan (Potentially Vulnerable Area 12/18) 188
Summary of progress of actions to manage flood risk in the Girvan (PVA 12/18) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
study 
G
A shoreline management plan is
recommended; this study is not
limited to Potentially Vulnerable
Areas but should cover the whole
of the Ayrshire coastline and any
areas beyond this which may be
influenced by changes in coastal
processes. The study should
investigate flooding and coastal
erosion, wave overtopping and the
current coastal protection offered.
The study will help to develop an
understanding of coastal issues
and identify where further work
may be required to mitigate
against flooding.
01/06/2016-
01/06/2022
The Ayrshire Shoreline Management
Plan is completed and adopted by both
North and South Ayrshire Councils in
September/October 2018. 
The Ayrshire Shoreline Management
Plan will be reviewed every 6 years. 
N/A. 
Flood protection
study 
A flood study will be carried out to
further investigate river flood risk
combined with coastal flood risk to
Girvan. This study will build on the
work within the shoreline
management plan to provide a
01/06/2016-
01/06/2022
Mill Burn & Girvan Water Flood Study
including fluvial modelling has been
completed. The options appraisal has
been completed and a flood scheme
was submitted for national prioritisation
in December 2018. The submitted
N/A. 
DRAFT
Appendix 1

Page 195

Girvan (Potentially Vulnerable Area 12/18) 189
detailed investigation of the current
and future flood risk. The study
should examine the most
sustainable combinations of
actions to manage flooding. 
flood scheme would provide a 1 in 200
year level of flood protection and was
valued at £3M at the time of
submission. 
Awaiting the outcome of the Scottish
Government prioritisation process and
scheme funding review.
Strategic mapping
and modelling 
A
SEPA will seek to develop flood
mapping in the Ayr to Ardrossan
area to improve understanding of
coastal flood risk. The extent and
timing of improvements will
depend on detailed scoping and
data availability. Where this work
coincides with local authority
studies, SEPA will work
collaboratively to ensure consistent
modelling approaches are applied.
The coastal mapping and
modelling process will start in
2016, with early work focussing on
methodology development and
data collection. Once this stage
has been completed a thorough
review will be carried out to identify
01/01/2016-
31/12/2018.
Work completed to date includes the
production of key data sets including
extreme water levels and offshore
wave and wind conditions to support
future coastal modelling work.
Although this work has not been
completed to the timescale described
in the plan, the work that will be
progressed will deliver a more
comprehensive update of the coastal
flood hazard maps across the whole
area.          
SEPA will complete a review of
coastal flood hazard mapping in
south west Scotland including in
this area. This includes identifying
where taking account of the
impact of waves on flooding from
the sea may be required. SEPA
will collect the required coastal
defence asset and other
information necessary to progress
with improved flood modelling and
mapping in the highest priority
areas taking account of wave
overtopping where required.
SEPA will look for opportunities to
progress future modelling work in
a way that best supports
improvements to SEPA’s Coastal
Flood Warning Schemes.
DRAFT
Appendix 1

Page 196

Girvan (Potentially Vulnerable Area 12/18) 190
the final mapping improvements
that can be made in the area.
Expected to progress to the next
stage around the middle of cycle
2 and complete early in the
following cycle, subject to funding.
Strategic mapping
and modelling
Section 16
Assessment 
Scottish Water will undertake
further investigation and modelling
in the Girvan sewer catchment to
improve knowledge and
understanding of flood risk in this
area as required under Section 16
of the Flood Risk Management
(Scotland0 Act 2009.
01/01/2018 –
31/12/2020
The Scottish Water assessment of
flood risk within the sewer catchment
has been completed. 
The assessment is now
completed and has been shared
with Local Authority.
Maintain flood
protection
scheme* 
G
There are a number of sections of
coastal defences in Girvan which
provide some protection to the
area. These defences will be
maintained, and will continue to
manage flooding according to the
design standard at the time of
construction. An annual inspection
is carried out on all coastal
protection structures in South
Ayrshire with maintenance works
carried out on a priority basis
within available resources.
Additional inspections are carried
out in response to external defect
01/06/2016-
01/06/2022 
This work continues to be carried out
on an annual basis. 
South Ayrshire Council will continue to
inspect and maintain the flood
protection structures within the
catchment. 
N/A.
DRAFT
Appendix 1

Page 197

Girvan (Potentially Vulnerable Area 12/18) 191
reports or following severe storm
events.   
Maintain flood
warning 
Girvan Esplanade
flood warning area
G
SEPA will continue to maintain the
Girvan Esplanade flood warning
area which is part of the Firth of
Clyde coastal flood warning
scheme. When flood events occur
in an area with a flood warning
service, SEPA will seek to verify
and validate the warning service.
SEPA will use feedback and post-
event data to ensure that our flood
warning service is timely and
accurate.
22/12/2015-
22/06/2022
SEPA has continued to operate the
flood warning service.
N/A. 
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The service also
provides information which allows
SEPA to issue flood warnings,
giving people a better chance of
reducing the impact of flooding on
their home or business. For more
22/12/2015-
01/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
N/A
DRAFT
Appendix 1

Page 198

Girvan (Potentially Vulnerable Area 12/18) 192
information please visit SEPA’s
website. 
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle. Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property
and business owners can take
simple steps to reduce damage
and disruption to their homes and
businesses should flooding
happen. This includes preparing a
flood plan and flood kit, installing
01/06/2016-
01/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys and
appropriate and relevant information to
enable clients to make the right
decisions.
Ongoing community PLP training,
Flood Warden and resilience
group promotion.
DRAFT
Appendix 1

Page 199

Girvan (Potentially Vulnerable Area 12/18) 193
property level protection, signing
up to Floodline. The Councils,
SEPA and Scottish Water will
continue to engage with
responsible Authorities and all
other stakeholders, including
community groups and the public
to raise awareness of flood risk
and how those affected can be
better prepared. Further detail can
be found in the Councils and
Scottish Flood Forum websites. 
Awareness raising 
G
South Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
how those affected can be better
prepared. Through the continued
development of flood schemes and
studies at higher risk locations,
officers from the Council’s Flood
Risk Management Team attend
community council events to
discuss elements of flood risk
management.    Across Scotland,
SEPA will create and share
communication and education
22/12/2015-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
Awareness raising is a continuous
activity for South Ayrshire Council
which is actioned by updating the
Council’s website, working with
N/A.
DRAFT
Appendix 1

Page 200

Girvan (Potentially Vulnerable Area 12/18) 194
resources with other responsible
authorities. These resources will
include awareness campaigns,
media and marketing activity and
promotion of SEPA’s flood
forecasting and warning services
(Floodline).    Scottish Water will
provide targeted flooding
communications for Scottish Water
specific activities and raise
awareness by producing and
supplying targeted information to
the public on large capital projects
and detailed local studies
partners and engagement with relevant
stakeholders as appropriate.
Maintenance 
G
Local authorities have a duty to
assess watercourses and carry out
clearance and repair works where
such works would substantially
reduce flood risk. They produce
schedules of clearance and repair
works and make these available
for public inspection. Scottish
Water undertake risk based
inspection, maintenance and repair
on the public sewer network. Asset
owners and riparian landowners
are responsible for the
01/06/2016-
01/06/2022
South Ayrshire Council carry out
monthly inspections and clearance
work where necessary on 17 debris
screens where there is a known flood
risk from blockage. Watercourse
inspections are carried out on a regular
basis where there are known flood risk
issues. 
South Ayrshire Council will continue to
inspect and maintain watercourses,
screens and other Council assets.
N/A. 
DRAFT
Appendix 1

Page 201

Girvan (Potentially Vulnerable Area 12/18) 195
maintenance and management of
their own assets including those
which help to reduce flood risk.
Emergency
plans/response 
G
Providing an emergency response
to flooding is the responsibility of
many organisations, including local
authorities, the emergency
services and SEPA. Effective
management of an emergency
response relies on emergency
plans that are prepared under the
Civil Contingencies Act 2004 by
Category 1 and 2 Responders.
Scottish Water are a Category 2
responder under the Civil
Contingencies Act 2004 and will
support regional and local
resilience partnerships as required.
The emergency response by these
organisations is coordinated
through regional and local resili-
ence partnerships. This response
may be supported by the work of
voluntary organisations.
01/06/2016-
01/06/2022
For South Ayrshire Council, the
Ayrshire Civil Contingencies maintain
and update all emergency response
plans. These are updated every 3
years or as required after an incident.
This is done in conjunction with the
relevant department and external
agency. 
The Ayrshire Civil Contingencies team
is responsible for producing the Civil
Contingencies Plan, which outlines the
management and operational
arrangements that the Councils will
follow in the event of an emergency as
well as encouraging other agencies to
prepare for their role. The Councils will
contribute to the production and review
of the Civil Contingencies Plan and the
Emergency Plan for Severe Weather
and Flooding, as required. This
response may be supported by the
work of voluntary organisations.
N/A. 
DRAFT
Appendix 1

Page 202

Girvan (Potentially Vulnerable Area 12/18) 196
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management,
the policy supports a catchment-
scale approach to sustainable
flood risk management and aims to
build the resilience of our cities
and towns, encourage sustainable
land management in our rural
areas, and to address the long-
term vulnerability of parts of our
coasts and islands. Under this
approach, new development in
areas with medium to high
likelihood of flooding should be
avoided.
01/06/2016-
01/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
N/A. 
DRAFT
Appendix 1

Page 203

Girvan (Potentially Vulnerable Area 12/18) 197
The South Ayrshire Council Local
Development Plan recognises the
importance of sustainable flood risk
management in both urban and rural
developments and is in alignment with
Scottish Planning Policy. The Local
Development Plan was published in
February 2022. 
DRAFT
Appendix 1

Page 204

Dalmellington (Potentially Vulnerable Area 12/19c) 198
4.19 Dalmellington (Potentially Vulnerable Area 12/19c) 
Local Plan District  Local authority  Main catchment 
Ayrshire  East Ayrshire Council  East Ayrshire Council Muck Water 
Summary of Progress for Dalmellington 
There are approximately 50 residential properties at risk of flooding. The total
Annual Average Damages are approximately £140,000. Further information can be found in the Ayrshire Local
FRMP under PVA 12/019c, please click here. 
Key progress has been made with the installation of River Monitors on the Muck Water along with others in the
Doon Valley to gather hydraulic data to inform the completed combined Flood study (2020 -2022) for these
watercourses. The Flood study will inform Cycle 2 flooding actions for these locations 
© Crown copyright. SEPA licence number
100016991 (2015). All rights reserved. 
Reproduced from Ayrshire Flood Risk Management Strategy,
SEPA (December 2015). 
Overview of actions to manage flooding in Dalmellington 
DRAFT
Appendix 1

Page 205

Dalmellington (Potentially Vulnerable Area 12/19c) 199
Summary of progress of actions to manage flood risk in the Dalmellington (PVA 12/19c) 
Action Status Description Dates Progress in Delivery, including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
study 
G
A study will investigate the feasibility
of a flood protection scheme along
the Muck Water. East Ayrshire
Council is currently procuring
suitable flow and level monitoring
installations on appropriate
watercourses identified for studies,
with the intention of informing those
studies in areas known to have little
or no information currently available.
Information gaps and proposed
locations are being identified in co-
operation with SEPA. Once this
information is available the study will
look to refine understanding of the
current and future flood risk in the
area and investigate the feasibility of
actions to reduce flooding, as
prioritised in the Ayrshire Flood Risk
Management Strategy. 
01/06/2016-
22/06/2022
Progress has been made with the
installation of River Monitors on the
Muck Water along with others in the
Doon Valley, to gather hydraulic data
to inform the planned combined Flood
study (2020 -2022) for these
watercourses. The Flood study will
inform Cycle 2 flooding actions for
these locations.
Additional resourcing was required in
order to procure these works. 
This study has now been completed.
The anticipated rescheduling is not
envisaged to affect the ability to report
as intended in Cycle 2.
N/A. 
DRAFT
Appendix 1

Page 206

Dalmellington (Potentially Vulnerable Area 12/19c) 200
Flood forecasting 
G
The Scottish Flood Forecasting
Service is a joint initiative between
SEPA and the Met Office that
produces daily, national flood
guidance statements which are
issued to Category 1 and 2
Responders. The
service also provides information
which allows SEPA to issue flood
warnings, giving people a better
chance of reducing the impact of
flooding on their home or business.
For more information please visit
SEPA’s website.
20/122015-
22/06/2022
SEPA continues to improve the
Scottish Flood Forecasting Service
with the Met Office, with daily Flood
Guidance Statements and regional
Flood Alerts issued as required to
enable communities and responders to
reduce the impacts of flooding. SEPA
in partnership with the Met Office has
developed a public version of the daily
Flood Guidance Statement, the
Scottish Flood Forecast, to provide
better and earlier information to the
public. A beta version of this product
was launched in May 2022. It will be
refined in the wake of user feedback. A
more focussed version of the product,
producing guidance at a local level, is
planned for the next flood risk
management cycle.  Options for
developing forecasts of surface water
flooding have been published in 2022
to help urban areas and the transport
network improve their resilience to and
preparedness for flooding. The
development and wider roll-out of this
service is being considered alongside
the technical, resource and
N/A
DRAFT
Appendix 1

Page 207

Dalmellington (Potentially Vulnerable Area 12/19c) 201
communication challenges associated
with providing surface water flooding
guidance.
Self help 
G
Everyone is responsible for
protecting themselves and their
property from flooding. Property and
business owners can take simple
steps to reduce damage and
disruption to their homes and
businesses should flooding happen.
This includes preparing a flood plan
and flood kit, installing property level
protection, signing up to Floodline
The Councils, SEPA and Scottish
Water will continue to engage with
responsible Authorities and all other
stakeholders, including community
groups and the public to raise
awareness of flood risk and how
those affected can be better
prepared. Further detail can be
found in the Councils and Scottish
Flood Forum websites.
01/06/2016-
22/06/2022
Community Engagement includes,
PLP exhibitions, selection, surveys
and appropriate and relevant
information to enable clients to make
the right decisions.
Responsible Authorities shall continue
to support ongoing community PLP
training, Flood Warden and resilience
group promotion. 
Awareness
raising 
G
East Ayrshire Council, South
Ayrshire Council, SEPA and
Scottish Water collectively work to
raise awareness of flood risk and
01/06/2016-
22/06/2022
SEPA continues to work with others to
raise awareness of flood risk and its
flood warning service. It has
participated in local activities including
N/A.
DRAFT
Appendix 1

Page 208

Dalmellington (Potentially Vulnerable Area 12/19c) 202
how those affected can be better
prepared.
school / education and community
resilience activities when able. Some
planned activities notably in person
joint events have been limited or
delayed due to Covid 19. 
East Ayrshire Council and SEPA has
delivered a range of awareness raising
activities through campaigning,
education activities and partnership
delivery. We have run national and
local digital and direct engagement
campaigns to raise awareness of flood
risk and SEPA’s flood warning service,
Floodline. We publish and publicise an
electronic newsletter (Flooding
Gateway) four times a year which is
distributed to a wide audience. SEPA
are working with Education Scotland
and Scottish Government Resilience
team to embed flooding awareness
within the Curriculum for Excellence,
and resilience partners in Safer
Communities programmes. We have
also developed an online tool that
helps everyone share information on
current flooding issues (Report-a-
DRAFT
Appendix 1

Page 209

Dalmellington (Potentially Vulnerable Area 12/19c) 203
Flood). We have worked in partnership
with local authorities, emergency
services and community organisations
(e.g. Neighbourhood Watch Scotland,
Citizens Advice Scotland and others)
to share our resources and help to
promote preparedness and
understanding of how we manage
flood risk in Scotland. We have
actively supported the Scottish Flood
Forum and worked closely with UK
agencies to develop joint flooding
information.
Maintenance 
G
East Ayrshire Council in accordance
with Section 18 of the Flood Risk
Management (Scotland) Act 2009
undertake assessment of
water bodies to determine whether
works of clearance and repair would
substantially reduce the risk of
flooding. This information is
used to produce a schedule of
works which is available for the
public to inspect.
01/06/2016-
22/06/2022
High risk locations such as those with
screens and some smaller culverts
were inspected on a scheduled basis.
The majority of inspections tended to
be undertaken in the winter months
when flows are higher, and leaves and
other waterborne debris can be an
issue.
Works of clearance were carried out
during these inspections which
are not specifically "scheduled". The
main water bodies, and other
water bodies, within urban areas were
subject to an annual visual
The Council will continue to
inspect and maintain
watercourses, screens and other
relevant Council assets.
DRAFT
Appendix 1

Page 210

Dalmellington (Potentially Vulnerable Area 12/19c) 204
inspection and any works
Emergency
plans/response 
G
The Civil Contingencies Team
ensures that the Council will be able
to respond speedily and effectively
in a major emergency. North,
South and East Ayrshire teams are
a shared service team known as the
Ayrshire Civil Contingencies Team.
If disaster strikes, or if emergencies
develop in Ayrshire, communities
will look to the Council for support
and advice. The Ayrshire Civil
Contingencies Team ensures that
the Council will be able to respond
speedily and
effectively in a major emergency in
accordance with the Civil
Contingencies Act 2004
(Contingency Planning) (Scotland)
Regulations 2005. Our
responsibilities include preparing
comprehensive and robust
contingency plans and procedures
irrespective of the nature of the
emergency. The main aim is to
preserve life and property. Every
emergency plan also sets out to:
01/06/2016-
22/06/2022
Emergency Response Planning (ERP)
is carried out by Ayrshire Civil
Contingencies Team (ACCT). This is
an all Ayrshire shared service.
ACCT update and co-ordinate (all
Emergency Responders) the
emergency response plans (ERP) as
required (in direct consultation with
ARA, where appropriate). 
In addition to the ERP, East Ayrshire
Council has implemented a system of
river monitors in known areas and a
rota of Flood Scouts is maintained.
The Flood Scouts are tasked to
monitor and report back on status on
receipt of any alarm.
N/A. 
DRAFT
Appendix 1

Page 211

Dalmellington (Potentially Vulnerable Area 12/19c) 205
Mitigate the harmful effects of the
emergency on the environment;
bring about a swift return to normal
life in the communities and
environment affected; and
encourage all agencies and
organisations to prepare for their
role.
Planning policies 
G
Scottish Planning Policy and
accompanying Planning Advice
Notes set out Scottish Ministers’
priorities for the operation of the
planning system and for the
development and use of land. In
terms of flood risk management, the
policy supports a catchment-scale
approach to sustainable flood risk
management and aims to build the
resilience of our cities and towns,
encourage sustainable land
management in our rural areas, and
to address the long-term
vulnerability of parts of our coasts
and islands. Under this approach,
new development in areas with
medium to high likelihood of flooding
should be avoided.
01/06/2016-
22/06/2022
SEPA continues to exercise its
planning functions with a view to
reducing overall flood risk. We
effectively contribute to the delivery of
sustainable flood risk management
and we support the delivery of FRM
Plans and Local FRM Plans. In line
with the management actions that
accord with national planning policies,
we have and will continue to object to
development at medium to high risk of
flooding when it is contrary to the risk
framework set out in Scottish Planning
Policy. We have and will continue to
engage from the start of the
development plan process and
encourage planning authorities to
undertake a Strategic Flood Risk
Assessment to inform their spatial
N/A. 
DRAFT
Appendix 1

Page 212

Dalmellington (Potentially Vulnerable Area 12/19c) 206
strategy. We remain committed to
exercising our planning functions with
a view to reducing overall flood risk,
and when a new national planning
policy context is finalised later in 2022
via the National Planning Framework
4, we will take the same approach. 
East Ayrshire Council has prepared
and consulted on its Proposed Plan
LDP2. As part of the preparation of the
Plan, the Council engaged early with
SEPA on sites it was considering
allocating and took on board
comments from SEPA. In addition, The
Council has worked extensively with
SEPA and the KAG on issues
pertaining to flooding in Kilmarnock
and has undertaken a series of flood
workshops with the Key Agencies. The
new proposed plan contains flood
policies reflective of SEPA’s stance
and of NPF4.   
DRAFT
Appendix 1

Page 213

Other actions 207
4.20 Other actions 
This section sets out details of additional significant actions undertaken in the LPD by local authorities to contribute to the implementation of the current actions in the
plan and the achievement of the objectives in the plan. 
Action Status Description Dates Progress in Delivery,
including key
deliverables and dates
Revised dates and planned
actions to complete / address
delay
Flood protection
study
G
A study needs to be undertaken to further
investigate river flood risk at the Lower Irvine
Valley catchment and re-evaluate the fluvial
flood risk. The study should examine the most
sustainable combination of actions to manage
flooding.
01/06/2016-
01/06/2022
The River Irvine and
Annick Water fluvial
modelling is complete.
The study included a
regional climate change
sensitivity assessment
and was approved by
SEPA in July 2018. The
option appraisal is
complete, and the design
of a flood protection
scheme is an action that
has been identified in the
Flood Risk Management
Plan, published in 2021
by SEPA.  
N/A   
DRAFT
Appendix 1

Page 214

208
Appendix1: Roles and Responsibilities 
Individuals are the first line of defence against flooding. However, public bodies have responsibilities too and
are working together to reduce the impacts of flooding in Scotland. Responsibility for flood risk management
planning falls in the main to SEPA, local authorities and Scottish Water. However, individuals have a personal
responsibility to protect themselves and their property.
Some of the key roles are outlined below and more information is available from the SEPA website. 
Your responsibilities
Organisations and individuals have responsibilities to protect themselves from flooding. Being prepared by
knowing what to do and who to contact if flooding happens can help you reduce the damage and disruption
flooding can have on your life.
The first step to being prepared is to sign up to Floodline - www.floodlinescotland.org.uk - to receive messages
to let you know where and when flooding is likely to happen. Other useful tools and advice on how to be
prepared are available on the Floodline website including a quick guide to who to contact in the event of a
flood. You can also check how your area could be affected by flooding by looking at SEPA’s flood maps -
www.sepa.org.uk/environment/water/flooding/flood-maps 
SEPA
SEPA is Scotland’s national flood forecasting, flood warning and strategic flood risk management authority.
SEPA has a statutory duty to produce Scotland's Flood Risk Management Strategies. SEPA works closely
with other organisations responsible for managing flood risk through a network of partnerships and stakeholder
groups to ensure that a nationally consistent approach to flood risk management is adopted.
SEPA also has a responsibility to identify where in Scotland there is the potential for natural flood management
techniques to be introduced. Natural flood management is the use of the natural features of the land to store
and slow down the flow of water.
In running Floodline, SEPA provides live flooding information and advice on how to prepare for or cope with
the impacts of flooding 24 hours a day, seven days a week. To help forecast for flooding SEPA works closely
with the Met Office.
To raise awareness of flooding at a national level, SEPA runs education initiatives, community engagement
programmes and an annual campaign to promote the useful advice and information available through Floodline.
SEPA works in partnership with local authorities, Neighbourhood Watch Scotland, Ready Scotland and others
to share resources and help to promote preparedness and understanding of how flood risk is managed.
SEPA has a statutory role in relation to the provision of flood risk advice to planning authorities. This role is
expressed in Section 72 of the FRM Act, 2009. SEPA also has a duty to co-operate with planning authorities
in the preparation of development plans. When consulted in relation to planning applications for development
or site allocations in development plans, and where the planning authority considers there may be a risk of
flooding, SEPA will provide advice. The advice provided by SEPA will be with respect to the risk of flooding
and on the basis of the relevant information it holds which is suitable for planning purposes. It will also be in
line with the principles and duties set out in the FRM Act. Further information about how SEPA engage in the
DRAFT
Appendix 1

Page 215

209
planning system, including guidance on flood risk and planning is available on SEPA website
www.sepa.org.uk/environment/land/planning 
Local authorities
Local authorities work together for flood risk management planning purposes through a single lead authority
which has the responsibility to produce a Local Flood Risk Management Plan. Local authorities have been
working collaboratively in the manner described above to develop these. 
It is the responsibility of your local authority to implement its flood protection actions agreed within the Local
Flood Risk Management Plan. You can help your local authority to manage flooding by not dumping material
on the banks of a watercourse and by letting them know if flood defences are tampered with.
During severe flooding, local authorities will work with the emergency services and coordinate shelter for
people evacuated from their homes.
The Lead Local Authority for the Ayrshire Local Plan District is: North Ayrshire Council
Other local authorities who are responsible authorities for the Ayrshire Local Plan District are: East Ayrshire
Council and South Council. 
Scottish Water 
Scottish Water is a responsible authority for flood risk management and is working closely with SEPA, local
authorities and other responsible authorities to coordinate plans to manage flood risk.
Scottish Water has the public drainage duty and is responsible for foul drainage and the drainage of rainwater
run-off from roofs and any paved ground surfaces from the boundary of properties. Additionally, Scottish Water
helps to protect homes from flooding caused by sewers either overflowing or becoming blocked. Scottish Water
is not responsible for private pipework or guttering within the property boundary. 
Forestry Commission Scotland 
Forestry Commission Scotland was designated in 2013 as a responsible authority for flood risk management
planning purposes and has engaged in the development of the Local Flood Risk Management Plan. This
reflects the widely held view that forestry can play a significant role in managing flooding. 
Other organisations 
• The Scottish Government oversees the implementation of the Flood Risk Management (Scotland) Act
2009 which requires the production of Flood Risk Management Strategies and Local Flood Risk
Management Plans. Scottish Ministers are responsible for setting the policy framework for how
organisations collectively manage flooding in Scotland.
• Scottish Natural Heritage has provided general and local advice in the development of this Flood Risk
Management Strategies. Flooding is seen as a natural process that can maintain the features of interest
at many designated sites, so Scottish Natural Heritage helps to ensure that any changes to patterns of
flooding do not adversely affect the environment. Scottish Natural Heritage also provides advice on the
impact of Flood Protection Schemes and other land use development on designated sites and species.
• During the preparation of the first flood risk management plans Network Rail and Transport Scotland
have identified works to address flooding at a number of frequently flooded sites. Further engagement is
DRAFT
Appendix 1

Page 216

210
planned with SEPA and local authorities to identify areas of future work. There is the opportunity for further
works to be undertaken during the first flood risk management planning cycle although locations for these
works are yet to be confirmed.
• Utility companies have undertaken site specific flood risk studies for their primary assets and have
management plans in place to mitigate the effects of flooding to their assets and also minimise the impacts
on customers.
• The Met Office provides a wide range of forecasts and weather warnings. SEPA and the Met Office work
together through the Scottish Flood Forecasting Service.
• The emergency services provide emergency relief when flooding occurs and can coordinate
evacuations. You should call the emergency services on 999 if you are concerned about your safety or
the safety of others and act immediately on any advice provided.
• The Scottish Flood Forum is a Scottish charitable organisation that provides support for those who are
affected by, or are at risk of, flooding. It provides flood advice, information, awareness, education and
training to individuals and communities to help reduce the risk of flooding; in partnership with the local
authority, provides support during the recovery process following a flood incident and aims to support the
development of resilient communities.  
DRAFT
Appendix 1

Page 217

211
Appendix2: Consultation and engagement 
From 22 December 2014 a national consultation on the current state of knowledge of flood risk across Scotland
and what the potential solutions might be, was undertaken with the public on the work carried out to develop
draft Flood Risk Management Strategies and Local Flood Risk Management Plans.
The consultation was run jointly between SEPA and local authorities and involved the publication of draft
information that is contained in the strategies and local plans. The consultation was carried out in 2 phases:
- Phase 1 commenced on 22 December 2014 and initially provided a summary of the main sources and
impacts of flooding.
- Phase 2 commenced on 2 March 2015 when the proposed initial objectives to manage the identified flood
risk were made available alongside a short list of potential measures, as well as information on the draft
local flood risk management plans.
There was an opportunity to comment on the all the information provided between 2 March and 2 June 2015.
The responses helped to form the final Strategies and Plans.
The final Flood Risk Management Strategies for 14 Local Plan Districts were approved by the Scottish
Government and published by SEPA in December 2015. Further information is available on the SEPA website
here - http://apps.sepa.org.uk/FRMStrategies/
Following publication of the Flood Risk Management Strategies by SEPA, the Ayrshire local authorities
undertook a range of engagement activities through February and early March 2016 to raise awareness of the
Ayrshire Flood Risk Management Strategy, flood risk within the local authority area, as identified in the SEPA
Flood Maps available here - http://map.sepa.org.uk/floodmap/map.htm - and inform the development of the
Ayrshire Local Flood Risk Management Plan. The objective of this activity was to ensure a greater awareness
of these key documents, particularly for those communities identified as at risk of flooding. Further details of
the activities being undertaken are available from each Ayrshire Local Authority. There will be ongoing
engagement both with raising public awareness of the Plan and its approaches to managing or reducing flood
risk, and as part of the process of delivering Actions.  
DRAFT
Appendix 1

Page 218

212
Appendix3: Supporting Information 
Sources of flooding described in this Plan
The Local Flood Risk Management Plan addresses the risk of flooding from rivers, the coast and surface water.
The risk of flooding from rivers is usually due to rainfall causing a river to rise above bank level spreading out
and inundating adjacent areas. Coastal flooding is where the risk is from the sea. Sea levels can change in
response to tidal cycles or atmospheric conditions. Over the longer term sea levels and coastal flood risk may
change due to climate change. Surface water flooding happens when rainwater does not drain away through
the normal drainage systems or soak into the ground, but lies on or flows over the ground instead.
There can be interactions between these sources of flooding, and the Actions set out in this Plan take this into
account.
The following aspects of flooding have not been incorporated into this Plan:
• Groundwater is generally a contributing factor to flooding rather than the primary source. It is caused by
water rising up from underlying rocks or flowing from springs.
• Reservoir breaches have been assessed under separate legislation (Reservoirs (Scotland) Act 2011).
Further information and maps can be found on SEPA’s website.
• The Flood Risk Management Act (Scotland) 2009 does not require SEPA or responsible authorities to
assess or manage coastal erosion. However, SEPA has included consideration of erosion in the Flood
Risk Management Strategies by identifying areas that are likely to be susceptible to erosion and where
erosion can exacerbate flood risk. As part of considering where actions might deliver multiple benefits,
SEPA has looked to see where the focus of coastal flood risk management studies coincides with areas
of high susceptibility to coastal erosion. Subsequent detailed studies and scheme design will need to
consider how coastal erosion in these areas.
• Coastal flood modelling. The information on coastal flooding used to set objectives and identify actionsis
based on SEPA modelling using simplified coastal processes and flooding mechanisms at work during a
storm. Wave overtopping cannot be accurately modelled at a national scale due to the importance of local
factors such as prevailing wind conditions, the depth and profile of the near-shore sea bed or the influence
of any existing defences or management structures. As a result, coastal flood risk may be underestimated
in some areas. Conversely, in locations with wide and flat floodplains, the modelling may overestimate
flood risk. To address this, in a number of locations where more detailed local models were available they
have been incorporated into the development of the Flood Risk Management Strategies. Where wave
overtopping has been specifically identified as a concern – but where no further detailed modelling is
available – particular compensation has been made in the selection of appropriate actions to address
coastal flood risk.  
DRAFT
Appendix 1

Page 219

213
Commonly used terms
Below are explanatory notes for commonly used terms in flood risk management. A glossary of terms is also
available. 
• Reference to flood risk. During the development of the Strategy and Plan, flood risk has been assessed
over a range of likelihoods. For consistency in reporting information, unless otherwise stated, all references
to properties or other receptors being ‘at risk of flooding’ refer to a medium likelihood flood (up to a 1 in
200 chance of flooding in any given year). By exception, references will be made to high or low risk flooding,
which should be taken to mean a 1 in 10 chance/likelihood or 1 in 1000 chance/likelihood of flooding in
any given year respectively.
Likelihood of
Flooding Return Period
Annual Exceedance Probability
(chance of event occurring in any one
year)
High  10 year 10%
Medium  200 year 0.5%
Low  1000 year 0.1%
• Annual Average Damages have been used to assess the potential economic impact of flooding within
an area. Depending on its size or severity each flood will cause a different amount of damage to a given
area. Annual Average Damages are the theoretical average economic damages caused by flooding when
considered over a very long period of time. It does not mean that damage will occur every year: in many
years there will be no damages, in some years minor damages and in a few years major damages may
occur. 
High likelihood events, which occur more regularly, contribute proportionally more to Annual Average
Damages than rarer events. Annual Average Damages incorporate economic damages to the following
receptors: residential properties, non-residential properties, vehicles, emergency services, agriculture and
roads. They have been calculated based on the principles set out in the Flood Hazard Research Centre
Multi-Coloured Handbook (2010).
Flood risk management planning process
Flood risk management in Scotland aims to manage flooding in a sustainable way. Sustainable flood risk
management considers where floods are likely to occur in the future and takes action to reduce their impact
without moving the problem elsewhere. It considers all sources of flooding, whether from rivers, the sea
or from surface water. It delivers actions that will meet the needs of present and future generations whilst
also protecting and enhancing the environment.
The sustainable approach to managing flood risk works on a six year planning cycle, progressing through
the key stages outlined below.
• Identifying priority areas at significant flood risk
The first step to delivering a risk based, sustainable and plan-led approach to flood risk management was
SEPA’s National Flood Risk Assessment, which was published in 2011. The assessment considered
the likelihood of flooding from rivers, groundwater and the sea, as well as flooding caused when heavy
DRAFT
Appendix 1

Page 220

214
rainfall is unable to enter drainage systems or the river network. The likelihood of flooding was examined
alongside the estimated impact on people, the economy, cultural heritage and the environment. It
significantly improved our understanding of the causes and consequences of flooding and identified areas
most vulnerable to floods.
• Potentially Vulnerable Areas and Local Plan Districts
Based on the National Flood Risk Assessment, SEPA identified areas where flooding was considered to
be nationally significant. These areas are based on catchment units as it is within the context of the wider
catchment that flooding can be best understood and managed. These nationally significant catchments
are referred to as Potentially Vulnerable Areas. 
In Scotland, 243 Potentially Vulnerable Areas were identified. They are estimated to contain 92% of the
total number of properties at risk. 
A small number of Candidate Potentially Vulnerable Areas were identified after the National Flood Risk
Assessment in light of new information that warranted further assessment and appraisal. They are included
in the flood risk management planning process. The National Flood Risk Assessment will be updated to
inform each subsequent planning cycle.
For flood risk management purposes, Scotland was divided into 14 Local Plan Districts. Each Local Plan
District will have a Flood Risk Management Strategy and a Local Flood Risk Management Plan.
• Improving the understanding of flooding
SEPA developed flood hazard and flood risk maps between 2012 and 2014. These maps improved the
understanding of flooding and helped inform the subsequent selection of actions to manage flood risk in
Potentially Vulnerable Areas. The flood hazard maps show information such as the extent of flooding,
water level, as well as depth and velocity where appropriate. The flood risk maps provide detail on the
impacts on people, the economy, cultural heritage and the environment.
In 2012 SEPA also developed an assessment of the potential for natural flood management. The
assessment produced the first national source of information on where natural flood management actions
would be most effective within Scotland. 
Flood hazard and flood risk maps and the assessment of the potential for natural flood management can
be viewed on the SEPA website www.sepa.org.uk.
• Identifying objectives and selecting actions
The objectives and actions to manage flooding will provide the long-term vision and practical steps for
delivering flood risk management in Scotland.
Working collaboratively with local partnerships, SEPA has agreed the objectives for addressing the main
flooding impacts. Actions that could deliver these agreed objectives have been appraised for their costs
and benefits to ensure the right combinations are identified and prioritised. The actions considered in the
development of this strategy include structural actions (such as building floodwalls, restoring flood plains,
or clearance and repair works to rivers) and non-structural actions (such as flood warning, land use
planning or improving our emergency response). Structural and non-structural actions should be used
together to manage flood risk effectively. 
An assessment of the potential for natural flood management was used to help identify opportunities for
using the land and coast to slow down and store water. Natural flood management actions were
DRAFT
Appendix 1

Page 221

215
recommended in areas where they could contribute to the management of flood risk. In such instances
these actions were put forward as part of flood protection or natural flood management studies.
• Lead local authority
The FRM Act requires a lead local authority to be identified for each Local Plan District. The lead local
authority is crucial to the successful implementation of the FRM Act and, as such, must perform several
important functions over and above the general duties and powers given to local authorities elsewhere in
the FRM Act. 
The lead local authority, having contributed with other local authorities to the production of the Flood Risk
Management Strategy, must prepare a Local Flood Risk Management Plan of co-ordinated actions to
reduce flood risk within the Local Plan District. Although the lead local authority is responsible for the
production of the plan, its content will be drawn from and agreed by all local authorities, other responsible
authorities and SEPA within the Local Plan District. 
• Surface Water Management Plans
A Surface Water Management Plan (SWMP) is a best practice plan which outlines the preferred surface
water management strategy in a given location. In this context surface water flooding describes flooding
from sewers, drains, groundwater, and runoff from land, small water courses and ditches that occurs as a
result of heavy rainfall.
A SWMP study is undertaken in consultation with key local partners who are responsible for surface water
management and drainage in their area. Partners work together to understand the causes and effects of
surface water flooding and agree the most cost effective way of managing surface water flood risk for the
long term. The process of working together as a partnership is designed to encourage the development of
innovative solutions and practices.
A SWMP should establish a long-term action plan to manage surface water in an area and should influence
future capital investment, drainage maintenance, public engagement and understanding, land-use
planning, emergency planning and future developments.
The UK Government SWMP guidance seeks to provide a simplified overarching framework, which allows
different organisations to work together and develop a shared understanding of the most suitable solutions
to surface water flooding problems. The SWMP guidance has been written for local authorities to assist
them as they co-ordinate and lead local flood risk management activities.
• Integrated Catchment Studies
Integrated Catchment Studies (ICS) are led by Scottish Water in partnership with local authorities and
SEPA. These studies will improve knowledge and understanding of the interactions between the above
ground and below ground drainage network e.g. with the sewer network, watercourses and (where
appropriate) the sea. This will improve the understanding of contributions these drainage networks play in
local surface water flood risk. 
Five ICS’s were undertaken in Scotland during SR10 (2010-2015), to Modelling and Flood Risk
Assessment stage, which have provided a fuller understanding of the sources and mechanisms of flooding
across these catchments. These studies are expected to undertake an Optioneering phase between 2015-
2021. This will identify the actions to reduce flood risk across the catchments, with the outputs feeding into
the Local Authority led Surface Water Management Planning process. 
DRAFT
Appendix 1

Page 222

216
Fifteen ICS’s will begin in Scotland during SR15 (2015-2021). These studies will go through the Scoping
and Modelling phases, which culminates in defining the sources and mechanisms of flooding in the
catchment, and an understanding of the impacts of that flooding. It is expected that the ICS partnerships
will remain and it is anticipated that the Optioneering phase for these studies will be initiated directly after
the preceding phases.
Within this Local Plan District, ICS’s are being carried out in the following areas; Meadowhead (including
Irvine, Kilmarnock, Prestwick and Ayr), Stevenston Point (including Ardrossan, Stevenston, Saltcoats and
Kilwinning).
• Natural flood management assessment and mapping of artificial and natural features
The new approach to Flood Risk Management requires SEPA to consider whether techniques that restore,
enhance or alter natural features and characteristics can contribute to managing flood risk. This means
looking at the potential to work with natural hydrological and morphological processes. 
Because the National Flood Risk Assessment provides only a strategic assessment of flood risk, further
refined assessments may be required in Potentially Vulnerable Areas, including the mapping of artificial
and natural features whose removal could increase flood risk. 
The development of catchment characteristics and methodologies, to assess the potential for natural flood
management, commenced in 2012 alongside work to identify natural flood management actions, that could
contribute to the management of flood risk. The information was published in 2013. The assessment of
natural flood management was a consideration in the setting of objectives and actions in the Flood Risk
Management Strategies. In January 2016 SEPA published the Natural Flood Management Handbook to
provide practitioners with information on how best to implement natural flood management measures.
• Flood hazard and flood risk maps
The production of flood hazard and flood risk maps has improved our understanding of flooding and helped
inform the selection of actions required to manage flood risk in Potentially Vulnerable Areas. Work on
production of these maps began in January 2012. These maps show details of flood events for a range of
probabilities and cover flooding from rivers, the sea, sewers, surface water run-off and groundwater. 
A flood hazard map shows information that describes the nature of a flood, such as the extent of flooding,
water level, depth and velocity where appropriate. 
A flood risk map provides detail on the impacts on people, the economy, cultural heritage and the
environment. 
Further information regarding the development of the flood maps and providing a link to the maps, is
available online on the SEPA website here – http://www.sepa.org.uk/environment/water/flooding/flood-
maps/  
DRAFT
Appendix 1

Page 223

217
Appendix4: Acknowledgements 
The information described in this Annex relates to the Figures and Maps that have been generated by SEPA
as part of the Flood Risk Management Strategy and have been reproduced in this Local Flood Risk
Management Plan. The Ayrshire Local Plan District Partners gratefully acknowledge the cooperation and input
that various parties have provided, including inter alia, the following organisations: 
SEPA
Local authorities acknowledge the inclusion of Figures, Maps and text generated by SEPA in preparation of
the Ayrshire Flood Risk Management Strategy. Figures and Maps produced by SEPA for the Ayrshire Flood
Risk Management Strategy have been reproduced in the Ayrshire Local Flood Risk Management Plan with
authorisation from SEPA under SEPA Licence number 100016991 (2015). 
Ordnance Survey
These reproduced maps are based upon Ordnance Survey material with the permission of Ordnance Survey
on behalf of the Controller of Her Majesty’s Stationery Office © Crown Copyright. Any unauthorised
reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. SEPA Licence
number 100016991 (2015).  North Ayrshire Council Licence number 100023373 (2016). 
The Met Office 
Data provided by The Met Office has been used under licence in some areas of flood risk information
production. ©Crown Copyright (2015), the Met Office 
Local authorities 
Lead authorities acknowledge the provision of flood models and other supporting data and information from
local authorities and their collaboration in the production of flood risk management information. 
Scottish Water 
Local authorities acknowledge the inclusion of surface water flooding data generated by Scottish Water in
preparation of flood risk information. 
DRAFT
Appendix 1

Page 224

218
Appendix5: Glossary 
Actions - Actions describe where and how flood risk will be managed. These actions have been set by SEPA
and agreed with flood risk management authorities following consultation. Selection of actions to deliver the
agreed objectives has been based on a detailed assessment and comparison of economic, social and
environmental criteria. The FRM Act uses the term ‘measures’ rather than ‘actions’.
Annual Average Damages (AAD) - Depending on its size or severity, each flood will cause a different amount
of damage to a flood prone area and we can calculate the cost of this damage. Annual Average Damages for
an area are the average costs per year that would occur from flooding over a very long period of time. Scottish
figures have been calculated based on the method set out in the Flood Hazard Research Centre’s Multi-
Coloured Handbook (2010).
Appraisal - Appraisal is the process of defining objectives, examining options and weighing up the costs,
benefits, risks and uncertainties before a decision is made. The FRM Strategy appraisal method is designed
to set objectives and identify the most sustainable combination of actions to tackle flooding from rivers, sea
and surface water.
Awareness Raising - Public awareness, participation and community support are essential components of
sustainable flood risk management. SEPA and the responsible authorities have a duty to raise public
awareness of flood risk. This is undertaken both individually and collaboratively by a range of organisations.
Improved awareness of flood risk and actions that prepare individuals, homes and businesses for flooding can
reduce the overall impact.
Benefit Cost Ratio (BCR) - A benefit cost ratio summarises the overall value for money of an action or project.
It is expressed as the ratio of benefits to costs (both expressed as present value monetary values). A ratio of
greater than 1:1 indicates that the economic benefits associated with an action are greater than the economic
costs of implementation; therefore this is taken as the threshold of economic viability. It should be
acknowledged that it is not always possible to accurately estimate economic values for all elements of benefit,
and BCR is just one of a number of techniques used in appraisal.
Candidate Potentially Vulnerable Area – A small number of Candidate Potentially Vulnerable Areas were
identified after the National Flood Risk Assessment in light of new information that warranted further
assessment and appraisal. They are included in the flood risk management planning process. The National
Flood Risk Assessment will be updated to inform each subsequent planning cycle.
Catchment – The area of land drained by a drainage system – either natural or piped.
Category (CAT) 1 and 2 Responders – As defined by the Civil Contingencies Act 2004. Category 1
responders are ‘core’ responders: local authorities, police, fire and rescue services, ambulance service, NHS
health boards, SEPA and the Maritime and Coastguard Agency. Category 2 responders are key co-operating
responders in support of Category 1 responders. These include gas and electricity companies, rail and air
transport operators, harbour authorities, telecommunications providers, Scottish Water, the Health and Safety
Executive and NHS National Services Scotland.
Coastal Flooding – Flooding that results from sea level rise from a combination of high tides and stormy
conditions. The term coastal flooding is used under the Flood Risk Management (Scotland) Act 2009, but in
some areas it is also referred to as tidal flooding and covers areas such as estuaries and river channels that
are influenced by tidal flows.
DRAFT
Appendix 1

Page 225

219
Combined Sewer - Combined sewers transport foul sewage from homes and industry as well as carrying
surface water runoff from gutters, drains and some highways. Heavy or prolonged rainfall can rapidly increase
the flow in a combined sewer until the amount of water exceeds sewer capacity.
Combined Sewer Overflow - Combined sewer overflows are purposely designed structures to ensure any
excess water from sewerage systems is discharged in a controlled way and at a specific managed location.
Confluence - Where two or more rivers meet.
Conveyance - Conveyance is a measure of the carrying capacity of a watercourse. Increasing conveyance
enables flow to pass more rapidly and reducing conveyance slows flow down. Both actions can be effective in
managing flood risk depending on local conditions.
Culvert - A pipe, channel or tunnel used for the conveyance of a watercourse or surface drainage water under
a road, railway, canal or other obstacle.
Damages - Flood damages are categorised as direct or indirect i.e. as a result of the flood water itself, or
subsequent knock on effects. Damage to buildings and contents caused by flood water are an example of
direct damages, whilst loss of industrial production, travel disruption or stress and anxiety are indirect. Some
damages can be quantified in monetary terms, and others can only be described. The potential damages
avoided by implementation of a flood risk management action are commonly referred to as the benefits of that
action. When comparing the effectiveness of different actions, it is useful to consider estimated damages and
damages avoided across the lifespan of the action. Within the FRM Strategies, a 100 year appraisal period
has been used as standard. This allows costs, damages and benefits across this time frame to be compared
in present value terms. See also ‘Annual Average Damages’.
Economic Impact - An assessment of the economic value of the positive and negative effects of flooding and
/ or the actions taken to manage floods. 
Embankment – A flood embankment is an engineered earthfill structure designed to contain high river levels
or protect against coastal flooding. They are commonly grass-covered, but may need additional protection
against erosion by swiftly flowing water, waves or overtopping.
Emergency Plans / Response - Emergency response plans are applicable for all types of flooding. They set
out the steps to be taken during flooding in order to maximise safety and minimise impacts where possible.
Under the Civil Contingencies Act, Category 1 Responders have a duty to maintain emergency plans.
Emergency plans may also be prepared by individuals, businesses, organisations or communities.
Environmental Impact - A change in the environment as a result of an action or activity. Impacts can be
positive or negative and may vary in significance, scale and duration.
Environmental Impact Assessment (EIA) - A process which identifies the potential environmental impacts,
both negative and positive, of a proposal.
Estuary - A coastal body of water usually found where a river meets the sea; the part of the river that is affected
by tides.
FEH99/13 The Flood Estimation Handbook (FEH) provides industry-standard methods for assessing flood risk
in the UK as well as guidance on rainfall and river flood frequency estimation. The latest update launched in
2013 has incorporated a larger dataset with an increased number of Scottish catchments included. This has
improved the confidence in the usage of this methodology across Scotland.
Flood - In the terms of the FRM Act, ‘flood’ means a temporary covering by water, from any source, of land
not normally covered by water. This does not include a flood solely from a sewerage system, as a result of
DRAFT
Appendix 1

Page 226

220
normal weather or infrastructure drainage. A flood can cause significant adverse impacts on people, property
and the environment.
Flood Bund - A constructed retaining wall, embankment or dyke designed to protect against flooding to a
specified standard of protection. 
Flood defence - Infrastructure, such as flood walls, embankments or flood storage intended to protect an area
against flooding to a specified standard of protection.
Flood Extent - The area that has been affected by flooding, or is at risk of flooding from one or more sources
for a particular likelihood.
Flood Frequency - The probability that a particular size/severity of flood will occur in a given year (see
likelihood).
Flood Hazard - In terms of the FRM Act, hazard refers to the characteristics (extent, depth, velocity) of a flood.
Flood Hazard Map - Flood hazard maps are required by the FRM Act to show information that describes the
nature of a flood in terms of the source, extent, water level or depth and, where appropriate, velocity of water.
Flood hazard and risk maps are referred to collectively as flood maps and are available on the SEPA website.
Flood Prevention / Protection Scheme - A flood protection scheme, as defined by the FRM Act, is a scheme
by a local authority for the management of flood risk within the authority area. This includes defence measures
(flood prevention schemes) formerly promoted under the Flood Prevention (Scotland) Act 1961.
Flood Protection Study - Flood protection studies aim to refine understanding of the hazard and risk
associated with flooding in a particular area, catchment or coastline. They will involve detailed assessment of
flood hazard and / or risk and may develop options for managing flood risk.
Flood Protection Works - Flood protection works can include the same flood defence measures that would
make up a formal Flood Protection Scheme but without the legal process, protections and requirements that
would come by delivering the works as a scheme.
Flood Risk - A measure of the combination of the likelihood of flooding occurring and the associated impacts
on people, the economy and the environment.
Flood Risk Assessment - Flood Risk Assessments are detailed studies of an area where flood risk may be
present. These are often used to inform planning decisions, may help to develop flood schemes and have also
contributed to the National Flood Risk Assessment.
Flood Risk Management Strategy - Sets out a long-term vision for the overall reduction of flood risk. Contains
a summary of flood risk in each Local Plan District, together with information on catchment characteristics and
a summary of objectives and actions for Potentially Vulnerable Areas. Flood Risk Management Plans
Strategies have been re-named Flood Risk Management Plans in 2021. 
Flood Risk Management (Scotland) Act 2009 (FRM Act) - The flood risk management legislation for
Scotland. It transposes the EC Floods Directive into Scots Law and aims to reduce the adverse consequences
of flooding on communities, the environment, cultural heritage and economic activity.
Flood Risk Management Cycle - Under the FRM Act flood risk management planning is undertaken in six
year cycles. The first planning cycle is 2015 – 2021. The first delivery cycle is lagged by approximately 6
months and is from 2016 - 2022.
Flood Warning Scheme - A flood warning scheme is the network of monitoring on a coastal stretch or river,
which provides SEPA with the ability to issue Flood Warnings.
Floodplain - Area of land that borders a watercourse, an estuary or the sea, over which water flows in time of
flood, or would naturally flow but for the presence of flood defences and other structures where they exist.
DRAFT
Appendix 1

Page 227

221
Floodplain Storage - Floodplains naturally store water during high flows. Storage can be increased through
natural or man-made features to increase flood depth or slow flows in order to reduce flooding elsewhere.
Green (Blue-Green) Infrastructure - The European Commission defines green infrastructure as “the use of
ecosystems, green spaces and water in strategic land use planning to deliver environmental and quality of life
benefits. It includes parks, open spaces, playing fields, woodlands, wetlands, road verges, allotments and
private gardens. Green infrastructure can contribute to climate change mitigation and adaptation, natural
disaster risk mitigation, protection against flooding and erosion as well as biodiversity conservation.”
Historic Environment Scotland - The new lead public body for the country’s historic environment. It brings
together Historic Scotland and the Royal Commission on the Ancient and Historic Monuments of Scotland.
Habitats Regulations Appraisal - The Habitats Regulations require competent authorities to assess certain
plans or projects which affect Natura sites. Any development proposal, which requires planning permission or
other consent, is a 'project' which may require consideration under the Habitats Regulations.
Land Use Planning – The process undertaken by public authorities to identify, evaluate and decide on
different options for the use of land, including consideration of long term economic, social and environmental
objectives and the implications for different communities and interest groups.
Lead Local Authority - A local authority responsible for leading the production, consultation, publication and
review of a Local Flood Risk Management Plan.
Local Development Plan – A Local Development Plan (LDP) provides the vision for how communities will
grow and develop in the future. The intention is that they provide certainty for communities and investors alike
about where development should take place and where it should not and the supporting infrastructure required
for growth. A LDP is required for each council area across Scotland.
Local Flood Risk Management Plan - Produced by lead local authorities, these will take forward the
objectives and actions set out in Flood Risk Management Plans. They will provide detail on the funding,
timeline of delivery, arrangements and co-ordination of actions at the local level during each six year FRM
planning cycle.
Local Plan District - Geographical areas for the purposes of flood risk management planning. There are 14
Local Plan Districts in Scotland.
Local Plan District Partnerships - Each Local Plan District has established a local partnership comprised of
local authorities, SEPA, Scottish Water and others as appropriate. These partnerships are distinct from the
FRM Local Advisory Groups and they retain clear responsibility for delivery of the FRM actions set out in the
Local Flood Risk Management Plans. It is the local partnership that makes decisions and supports the delivery
of these plans.
Maintenance - Sections 18 and 59 of the Flood Risk Management (Scotland) Act 2009 put duties of
watercourse inspection, clearance and repair on local authorities. In addition, local authorities may also be
responsible for maintenance of existing flood protection schemes or defences.
National Flood Risk Assessment (NFRA) - A national analysis of flood risk from all sources of flooding which
also considers climate change impacts. Completed in December 2011 this provides the information required
to undertake a strategic approach to flood management that identifies areas at flood risk that require further
appraisal. The NFRA was reviewed and updated in December 2018.
Natural Flood Management - A set of flood management techniques that aim to work with natural processes
(or nature) to manage flood risk.
DRAFT
Appendix 1

Page 228

222
Non-Residential Properties - Properties that are not used for people to live in, such as shops or other public,
commercial or industrial buildings.
Potentially Vulnerable Area - Catchments identified as being at risk of flooding and where the impact of
flooding is sufficient to justify further assessment and appraisal. There were 243 Potentially Vulnerable Areas
identified by SEPA in the National Flood Risk Assessment and these will be the focus of the first FRM planning
cycle.
Property Level Protection - Property level protection includes flood gates, sandbags and other temporary
barriers that can be used to prevent water from entering individual properties during a flood.
Q&S - Quality and Standards (Q&S) is the process, governing costs and outputs, through which the planning
and delivery of improvements by Scottish Water to the public drinking water and sewerage services in Scotland
is carried out.
Receptor - Refers to the entity that may be impacted by flooding (a person, property, infrastructure or
habitat). The vulnerability of a receptor can be reduced by increasing its resilience to flooding.
Residual Risk - The risk that remains after risk management and mitigation. This may include risk due to
very severe (above design standard) storms or risks from unforeseen hazards.
Resilience - The ability of an individual, community or system to recover from flooding.
Responsible Authority - Designated under the FRM (Scotland) Act 2009 and associated legislation as local
authorities, Scottish Water and, from 21 December 2013, the National Park Authorities and Forestry
Commission Scotland. Responsible authorities, along with SEPA and Scottish Ministers, have specific duties
in relation to their flood risk related functions.
Return Period - A measure of the rarity of a flood event. It is the statistical average length of time separating
flood events of a similar size.
River Basin Management Planning (RBMP) - The Water Environment and Water Services (Scotland) Act
2003 transposed the European Water Framework Directive into Scots law. The Act created the River Basin
Management Planning process to achieve environmental improvements to protect and improve our water
environment. It also provided the framework for regulations to control the negative impacts of all activities
likely to have an impact on the water environment.
Runoff Reduction - Actions within a catchment or sub-catchment to reduce the amount of runoff during
rainfall events. This can include intercepting rainfall, storing water, diverting flows or encouraging infiltration.
Scottish Advisory and Implementation Forum for Flooding (SAIFF) - The stakeholder forum on flooding
set up by the Scottish Government to ensure legislative and policy aims are met and to provide a platform for
sharing expertise and developing common aspirations and approaches to reducing the impact of flooding on
Scotland’s communities, environment, cultural heritage and economy.
Scottish Flood Forecasting Service - SEPA operates a network of over 250 rainfall, river and coastal
monitoring stations throughout Scotland that generate data 24 hours a day. The Scottish Flood Forecasting
Service is a joint initiative between SEPA and the Met Office that produces daily, national flood guidance
statements which are issued to Category 1 and 2 Responders. The flood guidance statements provide an
assessment of the risk of flooding for a five day period allowing responders time to put preparations in place
to reduce the impact of flooding.  The service also provides information which allows SEPA to issue flood
warnings, giving people a better chance of reducing the impact of flooding on their home or business. For
more information please visit SEPA’s website.
DRAFT
Appendix 1

Page 229

223
Self Help - Self help actions can be undertaken by any individuals, businesses, organisations or
communities at risk of flooding. They are applicable to all sources, frequency and scales of flooding. They
focus on awareness raising and understanding of flood risk.
Site Protection Plans - Site protection plans are developed to identify whether normal operation of a facility
can be maintained during a flood. This may be due to existing protection or resilience of the facility or the
network.
Site of Special Scientific Interest - Sites protected by law under the Nature Conservation (Scotland) Act
2004 to conserve their plants, animals and habitats, rocks and landforms.
Special Area of Conservation (SAC) - Strictly protected site designated under the European Habitats
Directive. The Directive requires the establishment of a European network of protected areas which are
internationally important for threatened habitats and species.
Strategic Environmental Assessment - A process for the early identification and assessment of the likely
significant environmental effects, positive and negative, of activities. Often considered before actions are
approved or adopted.
Strategic Flood Risk Assessment (SFRA) - A Strategic Flood Risk Assessment is designed for the
purposes of specifically informing the Development Plan Process. A SFRA involves the collection, analysis
and presentation of all existing and readily available flood risk information (from any source) for the area of
interest. It constitutes a strategic overview of flood risk.
Standard of protection (SoP) - All flood protection structures are designed to be effective up to a specified
flood likelihood (Standard of Protection). For events beyond this standard, flooding will occur. The chosen
Standard of Protection will determine the required defence height and / or capacity.
Surface Water Management Plan (SWMP) - A plan that takes an integrated approach to drainage
accounting for all aspects of urban drainage systems and produces long term and sustainable actions. The
aim is to ensure that during a flood the flows created can be managed in a way that will cause minimum
harm to people, buildings, the environment and business.
Surface Water Plan / Study - The management of flooding from surface water sewers, drains, small
watercourses and ditches that occurs, primarily in urban areas, during heavy rainfall. FRM Strategy actions
in this category include: Surface Water Management Plans, Integrated Catchment Studies and assessment
of flood risk from sewerage systems (FRM Act Section 16) by Scottish Water. These have been selected as
appropriate for each Potentially Vulnerable Area.
Sustainable Drainage Systems (SuDS) - A set of techniques designed to slow the flow of water. They can
contribute to reducing flood risk by absorbing some of the initial rainfall and then releasing it gradually,
thereby reducing the flood peak and helping to mitigate downstream problems. SuDS encourage us to take
account of quality, quantity and amenity / biodiversity.
Sustainable Flood Risk Management - The sustainable flood risk management approach aims to meet
human needs, whilst preserving the environment so that these needs can be met not only in the present, but
also for future generations. The delivery of sustainable development is generally recognised to reconcile
three pillars of sustainability – environmental, social and economic.
Surface Water Flooding - Flooding that occurs when rainwater does not drain away through the normal
drainage systems or soak into the ground, but lies on or flows over the ground instead.
DRAFT
Appendix 1

Page 230

224
Vulnerability - A measure of how likely someone or something is to suffer long-term damage as a result of
flooding. It is a combination of the likelihood of suffering harm or damage during a flood and the ability to
recover following a flood (resilience).
DRAFT
Appendix 1

Page 231

Flood Risk Management
(Scotland) Act 2009:
Ayrshire Local Plan District
Draft Local Flood Risk
Management Plan (2022-2028)
Prepared by: North Ayrshire Council
DRAFT
Appendix 2

Page 232

1
Contents
Section 1
1. Flood Risk Management in Ayrshire Local Plan District ..................................................... 2
1.1 What is a Local Flood Risk Management Plan?....................................................... 2
1.2 How to read this plan ............................................................................................... 3
1.3 How we have developed the FRM Plan? .............................................................. 4
1.3.1 Coordination, collaboration and partnership working ........................................ 4
1.3.2 Roles and responsibilities for flood risk management planning ......................... 4
1.3.3 Consultation, engagement and advice .............................................................. 6
1.3.4 Strategic Environmental Assessment and Habitats Regulations Appraisal ....... 7
1.3.5 Identifying objectives and selecting actions ...................................................... 7
1.4 Links with other plans, policies, strategies and legislative requirements ............... 9
1.4.1 River basin management planning ................................................................... 9
1.4.2 Scottish Water Investment Plan ........................................................................ 9
1.4.3 Land Use and Spatial Planning ........................................................................ 9
1.4.4 Emergency Planning Response ..................................................................... 10
1.5 Next steps and monitoring progress ...................................................................... 10
1.5.1 Monitoring & Progress Reporting .................................................................. 10
1.5.2 Funding Review ............................................................................................11
1.6 Acknowledgements ............................................................................................. 11
Section 2
1. Actions across the LPD ................................................................................................. 12
2. Potentially Vulnerable Areas (PVAs)… .......................................................................... 27
3. List of Potentially Vulnerable Areas ............................................................................... 28
Annexes
Annex 1: Costs of Actions
Annex 2: Flood Risk Management Plan Consultation Summary
Annex 3: Acknowledgements
DRAFT
Appendix 2

Page 233

2 
Section 1
1. Flood Risk Management in Ayrshire Local Plan District 
1.1. What is a Local Flood Risk Management Plan? 
This Local Flood Risk Management Plan for the Ayrshire Local Plan District (the ‘Local FRM
Plan’) has been developed to describe how the actions set out in the Ayrshire Flood Risk
Management Plan published by SEPA (the ‘SEPA FRM Plan’) will be delivered. 
The SEPA FRM Plan was published in December 2021 and sets out the long-term ambitions
for flood risk management across the Ayrshire Local Plan District. The SEPA FRM Plan has set
objectives for tackling flooding in high-risk areas and has identified the actions needed to work
towards those objectives. These actions were agreed by the responsible authorities and are
based on the best available evidence on the causes and consequences of flooding. 
The actions contained in both plans are updated every 6 years. This Local FRM Plan describes
how these actions will be implemented between 2022 and 2028. The SEPA FRM Plan replaced
the earlier strategy published by SEPA in 2015 while this Local FRM Plan replaces the earlier
Local FRM Plan published by North Ayrshire Council in 2016. The updated plans continue to
build on the established risk-based, plan-led approach of the earlier plans. 
The Local FRM Plan is published by North Ayrshire Council, lead authority for the Ayrshire Local
Plan District. This Local FRM Plan has been prepared in close collaboration with East Ayrshire
Council, South Ayrshire Council and any other organisations with a responsibility or interest in
managing flooding. This plan is a requirement under the Flood Risk Management (Scotland) Act
2009. 
There are 13 other Local Plan Districts and covering other parts of Scotland. Each will have a
SEPA FRM Plan and Local FRM Plan.
DRAFT
Appendix 2

Page 234

3 
1.2. How to read this plan 
This Local FRM Plan should be read in parallel with the SEPA FRM Plan for the Ayrshire
Local Plan District, which is publicly available on SEPA’s website at:
https://www2.sepa.org.uk/frmplans/documents/lpd12-ayrshire-frmp-2021.pdf.
Extracts or other formats can be made available from SEPA on request. 
The layout of this Local FRM Plan is broadly similar to the SEPA FRM Plan and uses the same
objective and action identification references (IDs). 
This Local Flood Risk Management Plan has two sections: 
Section 1 contains background information on the approach taken in Scotland to manage flood
risk. It explains the duties and aims of relevant organisations, including how they work together
and how flood risk management planning is linked to other government policies and initiatives.
It also describes how flood risk management planning is delivered locally through a Local FRM
Plan. 
Section 2 is the most important section for those individuals and communities seeking to
understand their flood risk and its management. This section contains information on the 21
separate catchments within the Ayrshire Local Plan District that have the most significant flood
risk. These catchments are termed ‘Potentially Vulnerable Areas’. 
Within each Potentially Vulnerable Area (PVA), objectives and actions have been set for defined
areas, termed Target Areas. For each Target Area there is a short description of the causes and
consequences of flooding; the agreed goals or objectives are clearly defined; and actions that
will help to deliver these goals are explained in more detail, focusing on responsibility,
coordination, timing and funding. 
Section 2 also contains details about area wide actions. These actions apply across the entire
Ayrshire Local Plan District, including areas that are not within PVAs or Target Areas. 
Annexes to the plan provide supporting documents and references.
DRAFT
Appendix 2

Page 235

4 
1.3 How we have developed the Local Flood Risk Management Plan? 
1.3.1 Coordination, collaboration and partnership working 
Many organisations and individuals are involved in flood risk management in Scotland. The
causes and effects of flooding are complex, and issues cross the boundaries of neighbouring
authorities as well as the responsibilities of different organisations. To be successful, flood
risk management needs coordination, as set out in the flood risk management plans and the
local flood risk management plans. Collaboration by those responsible for flood management
is essential along with a commitment to work in partnership with the other organisations and
stakeholders who can contribute to the sustainable management of flooding. Partnership
working is at the heart of these plans and will be central to delivery of the objectives and
actions they set out. 
This Local FRM Plan has been developed in partnership, which has provided the evidence
through data sharing and improved understanding of each organisations objectives to allow
informed joint decisions. 
The Local FRM Plan has been developed by: 
North Ayrshire Council (lead authority);
East Ayrshire Council,
South Ayrshire Council,
Scottish Water;
SEPA; and
Any other responsible authority 
1.3.2 Roles and responsibilities for flood risk management planning 
Individuals have a personal responsibility to protect themselves and their property from
flooding. However, public bodies have responsibilities too and are working together to reduce
the impacts of flooding in Scotland. Some of the key roles are outlined below and more
information is available from the organisations listed. 
a) Your responsibilities It is your responsibility to manage your own flood risk and protect
yourself, your family, property or business. There are steps you can take now to be flood
prepared and reduce the damage and disruption flooding can have on your life. 
• View SEPA’s maps to check if your area is affected by flooding
https://map.sepa.org.uk/floodmaps 
• Sign up to Floodline to receive messages when flooding is forecast in your area
https://www.floodlinescotland.org.uk/ 
• Know who to contact if flooding happens
https://www.sepa.org.uk/media/28952/who_to_contact_2014.pdf 
Other useful tools and advice on how to be prepared are available on the Floodline website.
DRAFT
Appendix 2

Page 236

5 
b) Local Authorities are responsible for working together to produce Scotland’s local flood
risk management plans and work in partnership with SEPA, Scottish Water and other
responsible authorities to develop these. It is the responsibility of your local authority to
implement any of the identified actions within the Local FRM Plan that they lead on. 
Local authorities also inspect, clear and repair watercourses to reduce flood risk and routinely
maintain road gullies on public roads and highways. During severe flooding, local authorities
will work with the emergency services and coordinate shelter for people evacuated from their
homes. 
c) SEPA is Scotland’s national flood forecasting, flood warning authority and strategic flood
risk management authority. 
SEPA works in partnership with the Met Office to forecast for flooding and operate Floodline
in Scotland to warn the public and emergency responders when flooding is likely. SEPA
produces Scotland's Flood Risk Management Plans and works closely with other
organisations responsible for managing flood risk to ensure that a nationally consistent
approach to flood risk management is adopted.SEPA provides flood risk advice to land use
planning in Scotland when requested and raises awareness of flooding at a national level
through education initiatives, community engagement and campaigns. 
d) Scottish Water Scottish Water is a responsible authority for flood risk management and
is working closely with SEPA, local authorities and others to coordinate plans to manage
flood risk. Scottish Water has the public drainage duty and is responsible for draining
wastewater from properties and businesses, and rainwater run-off from roofs and paved
areas within the boundary of properties. Pipework and guttering within the boundary, are the
responsibility of the property owner. 
Scottish Water helps to protect homes from flooding caused by sewers either overflowing or
becoming blocked. This is done in a way that is fair and consistent to customers across the
country, with sewer flooding investment prioritised to provide the biggest benefit for
customers and the environment first. Currently investment to reduce the risk of sewer flooding
is prioritised towards properties that have experienced internal sewer flooding and are at the
highest risk of repeat occurrence of sewer flooding during frequent rainfall events. 
e) Other organisations 
The Scottish Government oversees the implementation of the Flood Risk Management
(Scotland) Act 2009, which requires the production of flood risk management plans and local
flood risk management plans. Scottish Ministers are responsible for setting the policy
framework for how organisations collectively manage flooding in Scotland. Scottish Ministers
have also approved the SEPA FRM Plan for Ayrshire. 
NatureScot has provided general and local advice in the development of this Flood Risk
Management Plan. Flooding is seen as natural process that can maintain the features of
DRAFT
Appendix 2

Page 237

6 
interest at many designated sites, so NatureScot helps to ensure that any changes to patterns
of flooding do not adversely affect the environment. NatureScot also provides advice on the
impact of Flood Protection Schemes and other land use development on designated sites
and species. 
Scottish Forestry and Forestry and Land Scotland took over the roles of Forestry
Commission Scotland in 2018 when the Forestry and Land Management (Scotland) Act 2018
came into force. While these executive agencies of Scottish Government are not formally
designated as a responsible authority under the Flood Risk Management (Scotland) Act
2009, they support Scottish Government in delivering its flood risk related duties. This
includes engaging in the development of the SEPA FRM Plans through national and local
advisory groups, Local Plan District partnerships, and collaborative projects. This reflects the
widely held view that forestry can play a significant role in managing flooding. 
There is the opportunity for further works to be undertaken during the second flood risk
management planning cycle by Utility Companies, Network Rail and Transport Scotland
to mitigate the effects of flooding to their assets and also minimise the impacts on customers. 
The Met Office provides a wide range of forecasts and weather warnings. SEPA and the Met
Office work together through the Scottish Flood Forecasting Service. 
The emergency services provide emergency relief when flooding occurs and can coordinate
evacuations. You should call the emergency services on 999 if you are concerned about your
safety or the safety of others and act immediately on any advice provided. 
Historic Environment Scotland considers flooding as part of their regular site assessments.
As such, flooding is considered as one of the many factors which inform the development
and delivery of its management and maintenance programmes. 
1.3.3 Consultation, engagement and advice 
Two public consultations have been held during the development of the SEPA FRM Plan and
this Local FRM Plan. The first by SEPA was on the national flood risk assessment and the
identification of PVAs (2018); the second, held jointly with local authorities, was on the
understanding of flooding in these priority areas and on the objectives and actions to manage
flooding (2021). 
The second, most recent consultation ran from December 2020 to October 2021 in 2 parts.
From December 2020, information on the Local Plan Districts, the PVAs and the communities
identified as target areas was made available. Further information on the objectives and
actions planned for each target area was added in July 2021. The consultation was
advertised widely by both SEPA and the local authorities. 678 responses were received, and
these helped shape the content of the SEPA FRM Plan and this Local FRM Plan.
DRAFT
Appendix 2

Page 238

7 
A summary of the consultation was submitted to Scottish Ministers and a more detailed report
on what contributors said and what SEPA did in response will be available on SEPA’s website
from March 2022. 
The consultation responses were noted and considered by the three local authorities within
the Ayrshire Local Plan District. While it was considered that the responses from members
of the public would not have a material impact on the planned funding, timing or
coordination of the actions, the responses were passed to the relevant local authority for
consideration in the development or implementation of the actions. 
NatureScot responded to the consultation to share the locations where there is potential for
partnership working. In response, an informative was added to the relevant pages of Section
2 of this plan. 
Some of the work carried out by SEPA on the production of the FRM Plan has been complex
and technical in nature for which they sought professional advice. Through membership of
the Scottish Advisory and Implementation Forum for Flooding (SAIFF), SEPA has received
assistance from local authorities, Scottish Water, Scottish Forestry, the National Park
Authorities and other key interested organisations. SEPA has also developed some of its
methods by working with other organisations with similar responsibilities within the UK and
Europe, more specifically with the Environment Agency and English local authorities in the
cross-border areas. 
1.3.4 Strategic Environmental Assessment and Habitats Regulations Appraisal 
North Ayrshire Council submitted a Strategic Environmental Assessment (SEA) Screening
Report to the SEA Gateway. The consultation authority responses agreed that a follow-up
Strategic Environmental Assessment was not required for the Local FRM Plan and that the
FRM Plan could rely on the SEA for the SEPA FRM Plan. The assessment for the Ayrshire
Local Plan District is available on SEPA’s website at:
https://www2.sepa.org.uk/frmplans/documents/environmental-report-appendicies-e-to-r.pdf 
No significant adverse effects have been identified. 
A Habitats Regulations Appraisal (HRA) was undertaken for the SEPA FRM Plan and this
has been used to inform the Local FRM Plan. This approach has been agreed with
NatureScot. Where the HRA identified mitigation measures to protect Natura sites or
interests, these have been incorporated into the Local FRM Plan. 
The Local FRM Plan only includes further detail on the implementation of the actions
identified in the SEPA FRM Plan and does not propose any additional actions. 
Further studies or works in future planning cycles (i.e. after 2028) will be the subject of future
flood risk management plans, which would need to be supported by a full habitats regulations
appraisal.
DRAFT
Appendix 2

Page 239

8 
1.3.5 Identifying objectives and selecting actions 
The objectives in both the SEPA FRM Plan and this Local FRM Plan provide the long-term
vision for delivering flood risk management in Scotland, and the actions give the practical
steps required to achieve those objectives.
A community perspective was used to identify where flood risk management actions should
target their benefits. Those areas are described as target areas.
A whole catchment approach was then used to understand the flood risk and the steps
needed towards managing the risk. Objectives and actions have been set for each target
area within each PVA. National actions have also been identified, which apply across all
Local Plan Districts including to areas that are not within PVAs.
Objectives were set by SEPA in collaboration with other flood risk management authorities
and partners and follow a set of national principles designed to deliver sustainable flood
management. The national principles are:
• Take a long term, risk-based approach to decisions, considering the impacts of climate
change and how we will be able to adapt;
• Deliver coordinated management of flood risk by engaging with communities and
working in partnership with others; and
• Consider whole catchments and coastlines, working with natural processes and the
environment to deliver multiple benefits.
These national principles sit alongside the more specific target area objectives. The target
area objectives fall into the following four categories in the 2021 plans:
• Avoid increasing flood risk; 
• Improve understanding of the flood risk; 
• Prepare for current flood risk and future flooding; and 
• Reduce the risk of flooding. 
Actions are required to achieve the objectives set for each community. To identify the most
sustainable actions, SEPA created a long list of all potential structural and non-structural
actions. A decision framework was used to identify the most appropriate set of actions
taking account of how well flood risk is currently understood in the area, what the scale of
the risk is and whether the options meet the national principles set out above. Indicative
costs for different types of action can be found in Annex 1.
The potential for natural flood management and blue-green infrastructure measures was
explored in developing the most sustainable actions. However, these actions are not
specifically noted as the need to consider such options is built into all actions for detailed
flood studies, and all actions to appraise potential options for managing risk.
DRAFT
Appendix 2

Page 240

9 
The overall long-term aim is to reduce the impact of flooding across Scotland as far as is
reasonable, taking full account of environmental, economic, and social priorities and needs.
1.4 Links with other plans, policies, strategies and legislative requirements 
1.4.1 River basin management planning 
River basin management aims to protect and improve the condition of Scotland’s rivers,
lochs, estuaries, coastal waters and groundwater. Taking action to reduce flood risk in
Scotland provides opportunities to deliver joint objectives for restoration and flood risk
management. Coordination between river basin management and flood risk management
can reduce flood risk, while also improving water quality and biodiversity. SEPA is leading
the delivery of both the river basin management plan and the flood risk management plans
so has worked to ensure that there is integration and coordination between them. This
coordination, particularly in regard to consultation and engagement, is important for
stakeholders who have an interest in the objectives of both plans. 
1.4.2 Scottish Water Investment Plan 
There is a close relationship between flood risk management plans and Scottish Water’s 25
year strategic plan. Sewer flooding is not considered in detail in the flood risk management
plans as it remains a high priority for Scottish Water and its customers. Scottish Water’s
close involvement in flood risk management planning aims to ensure that there is strong
coordination between the management of sewer flooding and wider surface water flood risk,
and the actions to be taken forward by local authorities and others. 
1.4.3 Land Use and Spatial Planning 
Land use planning decisions are one of the most powerful tools available to manage flood
risk, and the alignment of flood risk management and land use planning policy is pivotal to
achieving sustainable flood risk management. Decisions relating to flood risk management
can have significant implications for the location of development and, likewise, decisions
relating to the location of development can impact on flood risk. Flood risk management
plans must take account of local development plans relating to the district, and the need for
development plans to take account of flood risk management plans is included in the Town
and Country Planning (Development Planning) (Scotland) Regulations 2008 (as amended).
SEPA is a key agency in the land use planning process with a duty to cooperate with
planning authorities in the preparation of development plans and a statutory role to provide
flood advice for appropriate development management applications. The advice we give
seeks to promote flood avoidance. In addition, land use planning objectives and actions
have been agreed with responsible authorities, which will ensure flood risk is adequately
considered in local planning decisions.
DRAFT
Appendix 2

Page 241

10 
1.4.4 Emergency Planning Response 
Many organisations across Scotland, including local authorities, the emergency services
and SEPA provide an emergency response to flooding. Emergency plans are prepared and
maintained under the Civil Contingencies Act 2004 by Category 1 and 2 Responders and
are coordinated through regional and local resilience partnerships, often supported by
voluntary organisations. They set out the steps to be taken to maximise safety and
minimise impacts during flooding, ensuring the effective management of response to
emergencies. Emergency plans may also be prepared by individuals, businesses,
organisations or communities. Scottish Water is a Category 2 responder under the Civil
Contingencies Act 2004 and will support regional and local resilience partnerships as
required. 
1.5 Next steps and monitoring progress 
1.5.1 Monitoring and progress reporting 
The Plan runs for six years from 2022-2028. Over this period the Ayrshire Local Plan District
partnership will continue to meet periodically to monitor progress towards implementing the
actions detailed in Section 2 of this Plan. 
Between years 2 and 3 of the FRM cycle (i.e. before December 2025), North Ayrshire Council,
as lead authority will publish a report on the conclusions of a review of the Plan, including
information on the progress that has been made towards implementing the measures
identified in the implementation part of the Plan. 
Between years 5 and 6 of the FRM cycle (i.e. before December 2028), North Ayrshire
Council, as lead authority will publish a report on the Plan containing an assessment of the
progress made towards implementing the current measures, a summary of the current
measures which were not implemented, with reasons for their non-implementation, and a
description of any other measures implemented since the plan was finalised which the lead
authority considers have contributed to the achievement of the objectives summarised in the
Plan. 
The lead authority will make these reports available for public inspection. 
Unless otherwise stated, the actions in Section 2 of this plan will either be delivered on an
ongoing basis throughout the plan period or will be delivered in the middle part of the plan
period or will be delivered in the second part of the plan period. For future monitoring
purposes, the key dates for action deliver will be as follows: 
1. The end of the plan period is the 22nd of June 2028
2. The first half of the cycle will end on the 20th of June 2025
3. The second half of the cycle will run from 21st of June 2025 until the end of the plan period.
DRAFT
Appendix 2

Page 242

11 
1.5.2 Funding review 
SEPA has carried out a national prioritisation exercise based on the best available
understanding of flood risk and the capacity of lead organisations to deliver actions.
Funding for flood risk management actions typically come either directly from the lead
organisations or as happened in 2016, through an allocation of capital grant from the Scottish
Government. However, funding can be procured from other sources.
The distribution of Scottish Government grant funding for flood protection scheme actions in
the plan for the period 2022-2028 is currently being considered by a flood risk management
working group. This group will put forward options and recommendations to Scottish
Ministers and COSLA, through the Settlement and Distribution Group, for consideration.
A decision on future funding has not yet been made. As such, it should be noted that it may
not be possible for all flood protection scheme actions identified in this draft flood risk
management plan to be grant funded. Inclusion of an action in this plan does not formally
commit a Council to implement it, if reasons arise which make any actions undeliverable,
including inability to secure adequate funding.
A decision on grant funding is expected in time for the publication of the final local flood risk
management plan, which is required by Ministerial Direction to be published before the 31st
of December 2022.
A funding statement is expected by the 4th of November to allow this plan to be finalised. 
Given all of the above, there may be changes to the detail of actions, or the ability to deliver
actions in the identified timescales contained within Section 2 of this draft plan.
1.6 Acknowledgements 
A list of acknowledgements can be found in Annex 3 of this Plan.
DRAFT
Appendix 2

Page 243

12 
Section 2
The Ayrshire Local Plan District covers around 3,100km2 and has a population of approximately
370,000 people. The coastline has a length of around 300km from Largs in the North to North
Eastern Edge of Lochryan in the south and includes the Isle of Arran and Great Cumbrae. Urban
areas are mainly concentrated along the coast and include Kilmarnock, Irvine and Ayr.
The area is largely rural with the main land use being agricultural in the lower catchments whilst
upland areas have large sections of woodland and heather grassland. There are many lochs and
reservoirs in the area including Loch Doon, Loch Bradan, Loch Riecawr and Loch Finlas. The
main rivers are the Ayr, the Doon, the Garnock, the Girvan and the Irvine.
There is a river, surface water and coastal flood risk in the Local Plan District. There have been
several large floods, including Storm Desmond and Storm Frank in December 2015 and Storm
Caroline in December 2017. More recently, in August 2019, the Local Plan District was subject to
river and surface water flooding affecting many areas.
Currently it is estimated there are around 39,000 people and 23,000 homes and businesses at risk
from flooding. This may increase to 47,000 people and 28,000 homes and businesses by the
2080s due to climate change. The expected annual cost of flooding is around £18 million. Note
however that flooding from wave overtopping is not fully represented in the assessment of flood
risk and the impact of coastal flooding may be underestimated.
SEPA lead development of the flood risk management plans for Scotland and delivery of flood
warning services. North Ayrshire Council are the Lead Local Authority for the Ayrshire Local Plan
District which comprises of North Ayrshire Council, East Ayrshire Council and
South Ayrshire Council. Other responsible authorities include Scottish Water. They are supported
by Scottish Government agencies including Forestry and Land Scotland, Scottish Forestry and
Transport Scotland. 
Within this Local Plan District, actions are regularly carried out by SEPA and responsible
authorities to help prepare communities for potential flooding and reduce the impact of any
flooding that does occur.
DRAFT
Appendix 2

Page 244

13 
SEPA and responsible authorities carry out actions in all areas of the Local Plan District which
help to manage current and future flooding. These actions help to ensure that key aspects of flood
risk management are taken forward in all locations. They ensure that for example new housing
developments occur in the right places, and that critical flood risk information is developed and
updated for all areas. The following actions are due to take place over the next 6 years, and most
of these are carried out on an ongoing basis. 
Awareness raising
Action SEPA, the responsible authorities and other organisations such as the
Scottish Flood Forum work together through national and local initiatives
to help communities understand the risk of flooding and what actions
individuals can take. Improved awareness of flood risk and actions that
prepare individuals, homes and businesses for flooding can reduce the
overall impact of flooding.
Local authorities undertake additional awareness raising activities when
developing any specific project proposals and will engage with
community resilience groups and local communities.
Scottish Flood Forum support flood risk communities by raising
community awareness, promoting self-help, developing community
groups and establish a recovery support programme after a flood.
Scottish Water will provide targeted flooding communications for Scottish
Water specific activities and raise awareness by producing and supplying
targeted information to the public on large capital projects and detailed
local studies.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Scottish Water is funded by customer charges as set by our economic
regulator. All business activities required under this action by Scottish
Water are accounted for in their capital or operational expenditure.
Coordination Delivery of actions to raise awareness will be coordinated by the
responsible authorities through the Local Plan District Partnership.
Actions across the Local Plan District
DRAFT
Appendix 2

Page 245

14 
Data to support climate resilience
Action As Scotland’s hydrometric authority, SEPA operates a network of stations
to measure river level, flow, rainfall, sea level, loch and groundwater
level. The data goes into a long term data archive and is critical to
underpin all flood risk management activities including flood warning,
flood mapping, design of flood protection and sustainable development
as well as supporting a range of regulatory and recreational uses. 
SEPA will continue to maintain and develop its hydrometric network,
contribute to UK and international data archives, and improve and update
the datasets used for flood frequency analysis. 
SEPA will support research and development of data, methods and
guidance to improve the evidence on which decisions can be made, and
to enable the impact of climate change to be included in all flood risk
management activities.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding SEPA will coordinate with a range of other parties as required to deliver
better and more accessible data, and ongoing improvements to the use
of the data to underpin flood risk management activities and decisions.
Coordination SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
DRAFT
Appendix 2

Page 246

15 
Emergency plans
Action Many organisations, including local authorities, the emergency services
and SEPA provide an emergency response to flooding. Emergency plans
are prepared and maintained under the Civil Contingencies Act 2004 by
Category 1 and 2 Responders and are coordinated through regional and
local resilience partnerships, often supported by voluntary organisations.
They set out the steps to be taken to maximise safety and minimise
impacts during flooding. Emergency plans may also be prepared by
individuals, businesses, organisations or communities. Scottish Water is
a Category 2 responder under the Civil Contingencies Act 2004 and will
support regional and local resilience partnerships as required.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding The Scottish Government provides civil contingencies funding for local
authority emergency planning activities through grant aided expenditure.
SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination Coordination when required will be via local resilience partnerships.
The Ayrshire Civil Contingencies Team ensures that North Ayrshire, East
Ayrshire and South Ayrshire Councils will be able to respond in
accordance with the Civil Contingencies Act 2004 (Contingency
Planning) (Scotland) Regulations 2005.
DRAFT
Appendix 2

Page 247

16 
Flood forecasting
Action The Scottish Flood Forecasting Service is a partnership between SEPA
and the Met Office. The service continues to produce a daily, national
flood guidance statement, issued to emergency responders, local
authorities, and other organisations with flood risk management duties.
In 2022 a new 3-day daily Scottish Flood Forecast was launched for the
public. 
As the flood warning authority for Scotland SEPA continues to provide its
flood warning service issuing flood alerts and warnings when required,
giving people a better chance of reducing the impact of flooding on their
home or business.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA work in partnership with the Met Office and will work closely with
all other authorities involved in emergency response to flooding.
DRAFT
Appendix 2

Page 248

17 
Flood warning development framework
Action SEPA published a new flood warning development framework in 2022,
which details the ambition and strategic actions to maintain and improve
the flood warning service across Scotland.
SEPA will further develop phase 1 of the Scottish Flood Forecast based
on feedback gathered during public beta release before fully launching
the service to the public formally in early 2023. Phase 1 is the national 3-
day flood forecast and the starting point of our journey in providing the
public with earlier and improved flood information.
SEPA will continue to follow the service design approach for phase 2 of
the Scottish Flood Forecast, which will provide the public with more
localised flood forecast information. User research will determine what
information will be displayed on the regional flood forecast webpages. It
is anticipated that the final service will bring together all live information
such as flood warnings, river levels and rainfall data into a central hub
that is easily accessible for the public.
Working in close partnership with the Met Office through the Scottish
Flood Forecasting Service, SEPA will develop its capability in surface
water flooding forecasting, focusing initially on the transport sector to
support climate-ready infrastructure. SEPA will also undertake a
prioritised improvement programme of existing river and coastal flood
warning schemes to provide more accurate forecasting with improved
lead time.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA work in partnership with the Met Office. Appropriate engagement
with the other authorities involved in emergency response will happen as
the flood warning developments are progressed.
DRAFT
Appendix 2

Page 249

18 
Future flood risk management planning
Action The years covered by the lifetime of this plan are crucial. Radical
progress is needed in how we reduce our impact on the climate and
respond to the effects of climate change. How we plan to manage
flooding to our communities is on the front line of the challenges of this
decade. The 2027 flood risk management plans will be more ambitious
than ever before. The plans will look to develop long term plans for more
flood resilient communities prepared for the impacts of climate change. 
The priority areas which will be the focus points of the next flood risk
management plans will be identified in 2024 with the designation of
PVAs. A 3-month public consultation will be held to inform the PVA
designation. 
We will plan for a better future by publishing our flooding services
strategy in 2023 with a clear and measurable delivery plan. We will put
greener, fairer communities at the heart of our ambitions. 
SEPA has set its own target to be a regenerative organisation by 2030
and the next set of plans will further this ambition. 
During this plan cycle, SEPA will work to develop new partnerships with
a wider range of stakeholders, including businesses and commercial
sectors. We will investigate alternative sources of finance to tackle
flooding and drive forward practical options for adaptation.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028).
Flooding services strategy will be delivered in 2023 and the next flood
risk management plans will be published in 2027.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will lead the work, in partnership with the Scottish Government
and other responsible authorities. A wider range of partners and
stakeholders will be developed to support the action. SEPA will carry out
a full consultation on the next draft flood risk management plans in 2026. DRAFT
Appendix 2

Page 250

19 
Guidance development
Action The Scottish Government and SEPA will develop and update guidance
to inform flood risk management projects. This guidance will be
produced in 2022 and will look at how best to adapt to the long-term
impacts of climate change and the most appropriate methods of
assessing the benefits of flood risk management actions.
Technical guidance to support flood risk management partners will be
reviewed and updated by SEPA where required. 
Scottish Forestry, in collaboration with its UK counterparts, will produce
guidance on designing and managing forests to reduce flood risk. 
Guidance will be developed to help local authorities understand the
requirements for mapping relevant bodies of water and sustainable
urban drainage systems in their areas.
Indicative
Delivery
Draft flood studies guidance will be delivered by SEPA in 2023;
Options appraisal & adaptation guidance will be delivered by the Scottish
Government and SEPA in 2023; other guidance & updates will be
delivered between 2023-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination The Scottish Government, SEPA and Scottish Forestry all have lead
roles in delivering the new or updated guidance outlined. A range of
forums will be used to help coordinate and develop the guidance with the
appropriate input from others, including SAIFF (The Scottish Advisory
Implementation Forum for Flooding) and cross-party working groups.
DRAFT
Appendix 2

Page 251

20 
Hazard mapping updates
Action An understanding of flooding is essential to develop a plan led risk-
based approach to flood risk management. SEPA will continue to update
their national hazard mapping, which shows the likelihood of flooding in
Scotland from different flooding sources:
https://www.sepa.org.uk/environment/water/flooding/flood-maps/. SEPA
will continue to develop the hazard mapping viewer to make it easier for
the public, partners and stakeholders to access data on the likelihood of
flooding. SEPA will also review how modelling and mapping updates are
undertaken to develop a more effective method of regional and national
updates for the hazard maps.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with other relevant parties - including authorities who
have ownership of data used in flood mapping - to develop the quality
and accessibility of flood hazard mapping.
DRAFT
Appendix 2

Page 252

21 
Land use planning
Action Local authorities, SEPA and Scottish Water all have a responsibility
under the Flood Risk Management (Scotland) Act 2009 to support
sustainable flood risk management through the land use planning
process. National planning policies set out the Scottish Ministers’
priorities for the development and use of land. Under this approach, new
development in areas with medium to high likelihood of flooding should
generally be avoided. Current national planning policies aim to restrict
development within the floodplain and limit exposure of new receptors to
flood risk, promote flood reduction via natural and structural flood
management measures and restoration of natural features, and avoid
increased surface water flooding through sustainable drainage and the
minimisation of impermeable surfaces. Locally determined planning
policies may place further requirements within their area of operation to
restrict inappropriate development and prevent unacceptable risk.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding North Ayrshire, East Ayrshire and South Ayrshire Councils’ statutory
development planning and development management activities will be
funded through revenue budgets provided by the Scottish Government.
SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA delivery statutory advice on flooding on both planning applications
and Local Development Plans and will continue to work with the other
responsible authorities to support the land use planning process.
DRAFT
Appendix 2

Page 253

22 
Maintenance
Action Local authorities have a duty to assess bodies of water and to carry out
clearance and repair works where such works would substantially reduce
flood risk. Local authorities are also responsible for the drainage of
roads. In addition, local authorities may also be responsible for
maintenance of any existing flood protection schemes or works. 
Scottish Water will continue to undertake risk-based inspection,
maintenance and repair on the public sewer network. 
Asset owners and riparian landowners are responsible for the
maintenance and management of their own assets including those which
help to reduce flood risk.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding North Ayrshire, East Ayrshire and South Ayrshire Councils’ routine
clearance and repair work, routine maintenance of road drainage
systems and the maintenance of other Council owned flood risk
management assets will be funded through revenue budgets provided by
the Scottish Government.
Funding for this action is secured within Scottish Water's business plan.
Coordination North Ayrshire, East Ayrshire and South Ayrshire Councils’ will work in
coordination with all relevant stakeholders identified through the planning
and implementation of routine maintenance works.
Scottish Water will keep responsible authorities informed of large-scale
capital maintenance work to identify opportunities for co-ordination.
DRAFT
Appendix 2

Page 254

23 
Natural flood management mapping
Action SEPA will continue to support activities that improve our understanding
of how to effectively target and deliver natural flood management. As
part of this, SEPA will review and update the opportunities mapping for
natural flood management. This will include linking blue-green
infrastructure with the surrounding natural catchment and coastline.
Natural flood management seeks to store or slow down flood waters
through measures such as the planting of woodlands, wetland creation,
river restoration, or the creation of intertidal habitats.
In addition to flooding benefits, natural flood management measures can
also provide many additional benefits to biodiversity, water quality,
recreation, and carbon storage.
Indicative
Delivery
By the end of 2025.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with key stakeholders to review and update the
opportunities mapping.
NatureScot are very supportive of the principle of Natural Flood
Management (NFM). The agency’s view is that NFM could be widely
promoted throughout the implementation of the action contained in this
plan and would welcome further engagement on this with SEPA and
other key stakeholders in realising the potential of this important nature-
based solution.
DRAFT
Appendix 2

Page 255

24 
National flood risk assessment
Action SEPA will use the most suitable data to review and update the national
flood risk assessment (NFRA) undertaken in 2018. This update will be
used to identify future potentially vulnerable areas and focus flood risk
management planning.
Indicative
Delivery
December 2024
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with others as the NFRA is updated, including to keep
other responsible authorities informed through the Local Plan District
Partnerships. 
National surface water mapping
Action The national flood risk assessment 2018 identified that surface
water flooding has the potential to impact more properties in
Scotland than any other source of flooding. Over the next 6 year
cycle SEPA will look to vastly improve its national understanding of
surface flood risk by undertaking a wholescale update of the
national surface water maps to reflect developments in data and
understanding, including the impact of climate change.
Indicative
Delivery
2024
Funding SEPA’s role in this action is funded by Scottish Government
through SEPA’s grant in aid settlement.
Coordination SEPA is currently working with a contractor to develop the
modelling needed to deliver the flood maps. As the mapping is
developed, local authorities and Scottish Water will continue to be
engaged in opportunities to verify, shape and understand the new
mapping products. DRAFT
Appendix 2

Page 256

25 
Reservoirs
Action SEPA will continue to develop its assessment of flood risk from dam
failure and use these assessments to direct a proportionate regulatory
approach to ensure reservoir safety. Over the next management cycle
we will implement further developments of our flood warning capabilities
in the unlikely event of reservoir failure.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028).
Flood warning developments 2022-2024
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with others as required, to deliver the regulatory duties
and to develop flood warning capabilities. Others will include reservoir
managers and operators, and Civil Contingencies Act responders who
share duties for emergency response. 
Scottish Flood Defence Asset Database
Action The Scottish Flood Defence Asset Database provides information on
existing flood protection schemes. National data on flood protection
infrastructure is needed to understand flood risk and to develop
adaptation planning for Scotland. SEPA will continue to host SFDAD and
look for opportunities to support the development of our understanding of
how and when Scotland’s flood defence assets should be adapted to
continue to maintain protection from flooding in the future.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities to ensure accurate data on
existing and new schemes is made available for the Scottish Flood
Defence Asset Database.
DRAFT
Appendix 2

Page 257

26 
Self help
Action Everyone is responsible for protecting themselves and their property
from flooding. People can take steps to reduce damage and disruption to
their homes and businesses should flooding happen. This includes
preparing a flood plan and flood kit, installing property flood resilience
measures, signing up to Floodline, engaging with their local flood group,
and ensuring that properties and businesses are insured against flood
damage. The following places offer help with taking steps to protect
yourself:
https://www.floodre.co.uk/
https://www.biba.org.uk/current-issues/flood-insurance/
https://floodlinescotland.org.uk/
https://scottishfloodforum.org/
Responsible authorities and SEPA will continue to develop the
understanding of flood risk to communities and promote measures to
help individuals and businesses to reduce their risk.
Indicative
Delivery
Ongoing throughout the plan period (2022-2028)
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
North Ayrshire, East Ayrshire and South Ayrshire’s role in this action will
be funded through revenue budgets provided by the Scottish
Government.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership. 
More specific local actions to manage flood risk in target areas are detailed in the potentially
vulnerable areas (PVAs) sections below.
DRAFT
Appendix 2

Page 258

27 
Potentially vulnerable areas 
Potentially vulnerable areas (PVA) were designated in 2018 based on the potential current or
future risk from all sources of flooding. This designation was informed by the national flood risk
assessment (available to view at: https://www.sepa.org.uk/data-visualisation/nfra2018/). As part of
continued analysis of flood risk, the national flood risk assessment and potentially vulnerable
areas (PVA) will be reviewed every 6 years to take on board any new information. There are 21
potentially vulnerable areas (PVA) in this Local Plan District. Following sections provide more
information on these areas. 
Figure 1. Potentially vulnerable areas in Ayrshire Local Plan District
DRAFT
Appendix 2

Page 259

28 
LPD 12 Ayrshire – List of PVAs 
PVA Ref  PVA Name  Local authority area  Page number
02/12/01 Largs North Ayrshire 30
02/12/02 Largs to Kilwinning North Ayrshire 36
02/12/03 Upper Garnock catchment North Ayrshire 54 
02/12/04 Lower Irvine and Annick Water
catchment
East Ayrshire, North
Ayrshire, South Ayrshire
64
02/12/05 Irvine to Troon North Ayrshire, South
Ayrshire
79
02/12/06 Kilmarnock and Upper Irvine
catchment East Ayrshire 88
02/12/07 Pow Burn catchment South Ayrshire 113
02/12/08 Prestwick and Ayr South Ayrshire 120
02/12/09 River Ayr catchment South Ayrshire 133
02/12/10 Ayr south South Ayrshire 138
02/12/11 Ayr east South Ayrshire 143
02/12/12 Dalrymple to Dalmellington East Ayrshire 149
02/12/13 Drongan East Ayrshire 157
02/12/14 Straiton South Ayrshire 161
02/12/15 Cumnock East Ayrshire 165
02/12/16 Catrine East Ayrshire 172
02/12/17 Girvan South Ayrshire 180
DRAFT
Appendix 2

Page 260

29 
PVA Ref  PVA Name  Local authority area  Page number
02/12/18 Barrhill South Ayrshire 186
02/12/19 Isle of Arran North Ayrshire 190
02/12/20 Great Cumbrae Island North Ayrshire 206
02/12/21 Kirkmichael South Ayrshire 214
DRAFT
Appendix 2

Page 261

30 
02/12/01 (Largs) 
This area is designated as a potentially vulnerable area due to flood risk in Largs. There is
flooding from river, coastal and surface water. Recent floods have been caused by surface
water. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Largs north (target area 148) 
DRAFT
Appendix 2

Page 262

• Consider whole catchments and coastlines and work wi3t1h natural processes and the environment to deliver 
Summary Location map
Flood risk management plan datasheet 
Largs north (target area 148) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Gogo
Water (2013) and Noddsdale Water (2015) flood studies and for coastal flooding by the shoreline management
plan. There is a long record of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Largs North covers the coastal town of Largs which is
located on the banks of Noddsdale Water and Gogo
Water. The area is located within the North Ayrshire
local authority area. The main source of flooding in
Largs North is surface water flooding, however, there
is also risk from coastal flooding which is currently not
well understood and river flooding from the burns.
There are approximately 2,700 people and 1,400
homes and businesses currently at risk from flooding.
This is likely to increase to 3,000 people and 1,700
homes and businesses by the 2080s due to climate
change.
DRAFT
Appendix 2

Page 263

multiple outcomes. 
Objective ref Objective type Objective Description
1481 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Largs Coastal Flood
Protection Scheme 2002 and Gogo Street Flood Protection
Scheme 2013
1482 Avoid flood risk Avoid inappropriate development that increases flood risk
in Largs
1483 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Largs
1484 Reduce flood risk Reduce the risk of flooding in Largs 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities especially when connected to protected areas. 
Actions proposed to start between 2022 and 2028 
Flood study (options appraisal) (14801)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed.
Description Following the outcome of the Largs wave overtopping study, a further study
should be undertaken to investigate options for coastal flood risk mitigation.
The flood modelling should quantify the flood risk from all sources (as per
objectives), identifying all flooding mechanisms. The existing coastal flood
protection scheme should be considered for all flood sources and
scenarios. Flood risk should be quantified for present day and future flood
risk. If coastal and/or surface water flood risk is confirmed in the target area
a scoping study should be carried out to identify the future studies and
works required that will achieve the Prepare, Avoid and Reduce objectives
set.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during the first half of Cycle 2 (2022 - 2025).
Funding This study shall be funded through North Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities. SEPA will work with the local
authority on the potential to coordinate this action with work on coastal
flood mapping and flood warning actions.
Local Detail The completed Largs Wave Overtopping Study will be reviewed to include
other flood sources and mechanisms. This information along with the
established predicted standard of protection of the existing Largs Flood
Protection Scheme will guide future flood studies in this location.
DRAFT
Appendix 2

Page 264

33 
Community engagement (14802)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Awareness raising should be developed based on the findings of the flood
modelling. Update the community resilience plan including accounting for
expected changes in flood risk over the lifespan of the flood protection
scheme. This should consider the need for a community resilience group
and the need for a resilience and self help plan.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding This action shall be funded through North Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership.
Local Detail North Ayrshire Council shall update the relevant community flood resilience
plan to account for expected changes in flood risk over the lifespan of the
Flood Protection Scheme. 
Flood defence maintenance (14803)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description Largs Flood Protection Scheme was constructed in 2002 and consists of a
concrete seawall from Old Fish Quay to Gogo Water. This scheme provides
protection to the area for up to a 200 year flood. The Gogo Street Flood
Protection Scheme was completed in 2013 to mitigate flooding from the
Gogo Water to a standard of protection of a 1 in 75 year flood. These
schemes will continue to be maintained.
Delivery Lead North Ayrshire Council.
Indicative Delivery Flood defence maintenance will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding Maintenance works as required will be funded through North Ayrshire
Council's budget provided by Scottish Government.
Coordination North Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail North Ayrshire Council shall continue to inspect and maintain the Largs
Flood Protection Scheme and the Gogo Street Flood Protection Scheme to
secure the performance of these assets.
DRAFT
Appendix 2

Page 265

34 
Flood warning maintenance (14804)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through SEPA’s
grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service when required.
Local Detail N/A. 
Strategic mapping improvements (14805)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through SEPA’s
grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 266

35 
Data collection (14806)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council and SEPA will work on the potential to coordinate
opportunities for joint data collection activities.
Local Detail To inform any future long term flood study, appropriate gauging equipment
may be installed, as appropriate. Further details of this action will be
informed by developments in flood risk management planning between
2022-2028. 
Shoreline management plan (coastal adaptive plan) (14807)
Action The existing assessment of coastal flood and erosion risk is to be reviewed
and updated as required. The plan should include assessment of climate
change and develop adaptive approaches to allow for the impacts of climate
change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will work with other relevant responsible authorities,
statutory bodies and key stakeholders identified through the scoping stage
of the planned update to the shoreline management plan.
Local Detail Details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document. DRAFT
Appendix 2

Page 267

36 
02/12/02 (Largs to Kilwinning) 
This area is designated as a potentially vulnerable area due to flood risk in Fairlie, Kilwinning
and Dalgarven, Largs, Saltcoats and Stevenston and West Kilbride. There is flooding from
coastal, river and surface water. Recent surface water and river flooding has occurred in this
area. 
There are 5 target areas in this potentially vulnerable area, which have been the focus of
further assessment, these are listed below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Kilwinning and Dalgarven (target area 80)
Saltcoats and Stevenston (target area 121)
West Kilbride (target area 124)
Largs south (target area 149)
Fairlie (target area 155) 
DRAFT
Appendix 2

Page 268

37 
Summary Location map
Flood risk management plan datasheet 
Kilwinning and Dalgarven (target area 80) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment, integrated catchment study and the ongoing surface water management plan.
There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Kilwinning and Dalgarven are located west of
Glasgow. They are located within the North Ayrshire
local authority area. The main sources of flooding in
Kilwinning and Dalgarven are river and surface water
flooding. There are approximately 1,500 people and
810 homes and businesses currently at risk from
flooding. This is estimated to increase to 1,700 people
and 890 homes and businesses by the 2080s due to
climate change.
DRAFT
Appendix 2

Page 269

38 
Objective ref Objective type Objective Description
801 Avoid flood risk Avoid inappropriate development that increases flood risk
in Kilwinning and Dalgarven
802 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Kilwinning and Dalgarven
803 Reduce flood risk Reduce the risk of flooding in Kilwinning and Dalgarven 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Surface water management plan (8001)
Action Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system are
to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Description North Ayrshire Council completed the development of the plan pre-2022.
The next steps in managing water ponding or over-whelmed drainage
systems within the priority areas shall be identified by either North Ayrshire
Council or Scottish Water depending on the predominant flood source /
mechanisms.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during the second half of Cycle 2 (2025 -
2028).
Funding Surface water flood risk options appraisals will be funded through North
Ayrshire Council's budget provided by Scottish Government or funded by
Scottish Water's budget as appropriate.
Coordination North Ayrshire Council will work with Scottish Water to identify which
organisation should lead on managing surface water flood risk in each
identified priority area. There is potential to work with SEPA's River Basin
Management team to improve the physical condition of the water
environment.
Local Detail The Saltcoats, Ardrossan, Stevenston and Kilwinning (SASK) surface
water management plan and the Stevenston Point integrated catchment
study were completed in Cycle 1 (2016 - 2022). Options to reduce surface
water flood risk shall be progressed by either North Ayrshire Council or
Scottish Water depending on the source / mechanism of flood risk.
DRAFT
Appendix 2

Page 270

39 
Sewer flood risk assessment (8002)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Stevenston sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action is
secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2025-2027
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities and
SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Stevenston Point
sewer catchment to improve knowledge and understanding of flood risk in this
area as required under Section 16 of the Flood Risk Management (Scotland)
Act 2009. 
Flood warning maintenance (8003)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the River Garnock flood warning scheme. The scheme
should be investigated for improvement and/or recalibration.
Delivery Lead SEPA.
Indicative Delivery Second half of cycle.
Funding SEPA’s role in this action is funded by Scottish Government through SEPA’s
grant in aid settlement.
Coordination The aciton delivery lead is SEPA. SEPA will maintain the River Garnock flood
warning scheme. SEPA will continue to raise awareness of flood warning, and
engage with communities about the service when required.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document. 
Coordination with the river basin management plan 
This area has been identified as having potential for restoration in Scotland’s river basin management plan.
Actions should be coordinated to deliver any potential joint objectives for restoration and flood risk management.
This should be considered in the earliest stages of any projects.
DRAFT
Appendix 2

Page 271

40 
Summary Location map
Flood risk management plan datasheet 
Saltcoats and Stevenston (target area 121) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment, integrated catchment study and the ongoing surface water management plan.
Understanding of coastal flooding is improved by the shoreline management plan and Saltcoats Coastal
Defence works in 2006 performance review. There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
This area covers the coastal towns of Saltcoats,
Stevenston and Ardrossan. The area is located within
the North Ayrshire local authority area. The main
source of flooding is surface water, however there are
also risks from coastal and river flooding. There are
approximately 4,400 people and 2,500 homes and
businesses currently at risk from flooding. This is likely
to increase to 5,300 people and 3,000 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 272

41 
Objective ref Objective type Objective Description
1211 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Saltcoats flood
protection scheme 2006
1212 Avoid flood risk Avoid inappropriate development that increases flood risk
in this target area
1213 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in this target area
1214 Reduce flood risk Reduce the risk of flooding in this target area 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood study (12101)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description Following the outcomes of the surface water management plan, a flood
study to further investigate the interaction between surface water flooding
and other sources should be carried out. The impacts of climate change on
flood risk should be evaluated. If flood risk is confirmed, scoping of the next
steps should be completed.
Delivery Lead North Ayrshire Council.
Indicative Delivery This study will be delivered during the first half of Cycle 2 (2022 - 2025).
Funding This study will be funded through North Ayrshire Council's budget provided
by Scottish Government.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail Following the completed Saltcoats, Ardrossan, Stevenston and Kilwinning
(SASK) Surface Water Management Plan, this study shall investigate all
sources of flood risk in Saltcoats and Stevenston. 
Where flood risk is confirmed, a second phase of the study shall be
commissioned to scope the next steps towards reducing flood risk.
DRAFT
Appendix 2

Page 273

42 
Sewer flood risk assessment (12102)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Stevenston sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2025-2027
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Stevenston
Point sewer catchment to improve knowledge and understanding of flood
risk in this area as required under Section 16 of the Flood Risk
Management (Scotland) Act 2009. 
Flood defence maintenance (12103)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description Maintenance to the Saltcoats Flood Protection Scheme 2006 and Saltcoats
coastal defence works 2006 should continue and updates to the
maintenance regime be made based on the findings of the flood study.
Delivery Lead North Ayrshire Council.
Indicative Delivery Flood defence maintenance will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding Maintenance works as required will be funded through North Ayrshire
Council's budget provided by Scottish Government.
Coordination North Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail North Ayrshire Council shall continue to inspect and maintain the Saltcoats
Flood Protection Scheme (2006) and the Saltcoats coastal defence works
(2006) to preserve the performance of these assets.
DRAFT
Appendix 2

Page 274

43 
Flood warning maintenance (12104)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will maintain the Firth of Clyde coastal flood warning scheme. SEPA
will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk information is
developed and updated for all areas. A description of these actions is included in the Local Plan District section at
the start of this document
DRAFT
Appendix 2

Page 275

44 
Summary Location map
Flood risk management plan datasheet 
West Kilbride (target area 124) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for coastal flooding by the
shoreline management plan. There are periodic records of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The coastal village of West Kilbride is located within
the North Ayrshire local authority area. The main
source of flooding in West Kilbride is surface water
flooding, however there is also a risk from coastal and
river flooding. There are approximately 270 people
and 150 homes and businesses at risk of flooding.
This is likely to increase to 320 people and 180 homes
and businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 276

45 
Objective ref Objective type Objective Description
1241 Avoid flood risk Avoid inappropriate development that increases flood risk
in West Kilbride
1242 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in West Kilbride
1243 Reduce flood risk Reduce the risk of flooding in West Kilbride 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Sewer flood risk assessment (12401)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Stevenston sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Stevenston
Point sewer catchment to improve knowledge and understanding of flood
risk in this area as required under Section 16 of the Flood Risk
Management (Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 277

46 
Flood study (12402)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This study will be delivered during Cycle 3 (2028 - 2034).
Funding This study will be funded through North Ayrshire Council's budget provided
by Scottish Government.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail Following the proposed review of the Ayrshire Shoreline Management Plan
and the proposed Scottish Water sewer flood risk assessment, this study
shall investigate Flood Risk in West Kilbride. 
Where flood risk is confirmed, a second phase of the study shall be
commissioned to scope the next steps towards reducing flood risk. 
Shoreline management plan (coastal adaptive plan) (12403)
Action The existing assessment of coastal flood and erosion risk is to be reviewed
and updated as required. The plan should include assessment of climate
change and develop adaptive approaches to allow for the impacts of
climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will work with other relevant responsible authorities,
statutory bodies and key stakeholders identified through the scoping stage
of the planned update to the shoreline management plan.
Local Detail Details of this action will be informed by developments in flood risk
management planning between 2022-2028.
DRAFT
Appendix 2

Page 278

47 
Community engagement (12404)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action shall be funded through North Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership.
Local Detail Community engagement will be carried out to inform stakeholders about
the latest understanding of flood risk following the updated Shoreline
Management Plan and the proposed Scottish Water sewer flood risk
assessment. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 279

multiple benefits. 
Summary Location map
Flood risk management plan datasheet 
Largs south (target area 149) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for coastal flooding by the
shoreline management plan and for surface water flooding by the sewer flood risk assessment. There are
periodic records of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work wi4t8h natural processes and the environment to deliver
©Crown copyright. All rights reserved. NAC lic no. 100023393
Largs South includes the southern part of the coastal
town of Largs, which is located near Haylie Reservoir.
The area is located within the North Ayrshire local
authority area. The main source of flooding in Largs
South is from surface water flooding, however there is
also a risk of coastal flooding. There are
approximately 110 people and 70 homes and
businesses currently at risk from flooding. This is likely
to increase to 160 people and 141 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 280

49 
Objective ref Objective type Objective Description
1491 Avoid flood risk Avoid inappropriate development that increases flood risk
in Largs
1492 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Largs
1493 Reduce flood risk Reduce the risk of flooding in Largs 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Flood warning maintenance (14901)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities
Local Detail N/A. 
Strategic mapping improvements (14902)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A.
DRAFT
Appendix 2

Page 281

50 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Shoreline management plan (coastal adaptive plan) (14903)
Action The existing assessment of coastal flood and erosion risk is to be reviewed
and updated as required. The plan should include assessment of climate
change and develop adaptive approaches to allow for the impacts of
climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will work with other relevant responsible authorities,
statutory bodies and key stakeholders identified through the scoping stage
of the planned update to the shoreline management plan.
Local Detail Details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 282

51
multiple benefits. 
Summary Location map
Flood risk management plan datasheet 
Fairlie (target area 155) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Fairlie
Flood Alleviation Project Option Review and Appraisal (2019) and for coastal flooding by the shoreline
management plan. There is a long record of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
©Crown copyright. All rights reserved. NAC lic no. 100023393
The coastal village of Fairlie is located within the North
Ayrshire Council area. The main sources of flooding in
Fairlie are coastal and surface water flooding. There
are approximately 380 people and 200 homes and
businesses at risk from flooding. This is likely to
increase to 480 people and 260 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 283

Objective ref Objective type Objective Description
1551 Avoid flood risk Avoid inappropriate development that increases flood risk
in Fairlie
1552 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Fairlie
1553 Reduce flood risk Reduce the risk of flooding in Fairlie 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (15501)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description North Ayrshire Council to develop detailed design for Fairlie Flood
Protection Scheme based on the preferred option from the flood study and
stakeholder engagement. The preferred option provides a standard of
protection for the 1 in 200 year (0.5% annual exceedance probability) event
plus a 20% allowance for climate change and consists of channel widening,
regrading and culvert enlarging.
The responsible authority proposes this action as the best viable option for
managing flood risk in this community. The delivery of this action is subject
to capital funding being made available.
Delivery Lead North Ayrshire Council.
Indicative Delivery The flood scheme design shall be completed during Cycle 2 (2022 - 2028).
The delivery of this action is subject to Scottish Government capital grant
funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination North Ayrshire Council will deliver this action in coordination with the
Scottish Government and SEPA along with Network Rail and Transport
Scotland as the detailed design would affect their assets.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping.
Local Detail The detailed design of the Fairlie Flood Protection Scheme is to include
joint working with Network Rail and Transport Scotland to provide a
scheme that will reduce fl5o2od risk to the nearby railway line and the trunk
DRAFT
Appendix 2

Page 284

Community engagement (15502)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description North Ayrshire Council to carry out community engagement linked to the
proposed (funding dependant) Fairlie Flood Protection Scheme. A
community engagement plan will be created to cover the time period from
detailed design to implementation of the flood protection solution.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified through the development of the
detailed design and the implementation of the Fairlie Flood Protection
Scheme. 
Strategic mapping improvements (15503)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A des5c3ription of these actions is included in the Local Plan
District section at the start of this document.
road network as well as providing protection to 41 properties in a 1 in 200-
year flood event plus a 20% allowance for climate change.
North Ayrshire Council proposes this action as the best viable option for
managing flood risk in this community.
DRAFT
Appendix 2

Page 285

54 
02/12/03 (Upper Garnock catchment) 
This area is designated as a potentially vulnerable area due to flood risk to Dalry and
Kilbirnie. The main source of flooding is the River Garnock and its tributaries, with some risk
from surface water flooding. There is a history of flooding in this area, with recent flooding
being caused by flooding from the River Garnock. 
There are 2 target areas in this potentially vulnerable area, which have been the focus of
further assessment, these are listed below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Dalry (target area 76)
Kilbirnie and Glengarnock (target area 97) 
DRAFT
Appendix 2

Page 286

55 
Summary Location map
Flood risk management plan datasheet 
Dalry (target area 76) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the studies
supporting the present development of the Upper Garnock Flood Protection Scheme. There is a long record of
flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Dalry is a small town located on the banks of the River
Garnock, Caaf Water and Rye Water. The area is
located within the North Ayrshire local authority area.
The main source of flooding in Dalry is river flooding,
however there is also a risk from surface water. There
are approximately 300 people and 150 homes and
businesses currently at risk from flooding. This is likely
to increase to 380 people and 190 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 287

56 
Objective ref Objective type Objective Description
761 Avoid flood risk Avoid inappropriate development that increases flood risk
in Dalry
762 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Dalry
763 Reduce flood risk Reduce the risk of flooding in Dalry 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities.
Actions proposed to start between 2022 and 2028 
Flood scheme or works implementation (7601)
Action The flood scheme is currently under construction.
Description The flood scheme in Dalry consists of a flood defence wall between the Mill
Park residential estate and Beith Road and a low flood defence
embankment to the south. The estate will be protected by the railway
embankment to the east. This requires the construction of embankment
stabilisation measures. Limited works are also being undertaken to protect
infrastructure within the DSM plant.
Delivery Lead North Ayrshire Council.
Indicative Delivery The Upper Garnock Flood Protection Scheme is under construction,
which will be completed in the early part of Cycle 2.
Funding 80% of eligible scheme costs qualify for Scottish Government capital
grant funding. The remaining 20% of eligible costs and any other
associated costs shall be met by North Ayrshire Council's budget.
Coordination North Ayrshire Council will coordinate with SEPA, Scottish Water, local
residents, landowners and other stakeholders throughout the
implementation of the flood scheme. SEPA will work with the local authority
on the potential to coordinate this action with an update to SFDAD and
flood warning actions.
Local Detail The Flood Protection Scheme measures in this target area shall be fully
implemented by the end of 2022 / first half of 2023.
DRAFT
Appendix 2

Page 288

57 
Community engagement (7602)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description North Ayrshire Council began engagement in the community in Dalry associated
with the Upper Garnock Flood Protection Scheme which began construction in
August 2020.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be an ongoing action throughout Cycle 2 (2022 -
2028).
Funding This action shall be funded through North Ayrshire Council's budget provided by
Scottish Government, subject to any future funding review.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan District
Partnership.
Local Detail North Ayrshire Council shall update the relevant community flood resilience plan
to account for expected changes in flood risk over the lifespan of the Flood
Protection Scheme. 
Sewer flood risk assessment (7603)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Stevenston sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water
Indicative Delivery 2025-2027
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Stevenston
Point sewer catchment to improve knowledge and understanding of flood
risk in this area as required under Section 16 of the Flood Risk
Management (Scotland) Act 2009.
DRAFT
Appendix 2

Page 289

58 
Flood warning maintenance (7604)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the River Garnock flood warning scheme. The
scheme should be investigated for improvement and/or recalibration.
Delivery Lead SEPA.
Indicative Delivery Second half of cycle.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with North Ayrshire Council on the potential coordinate
flood warning improvements with flood scheme and flood studies work.
SEPA will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 290

59 
Summary Location map
Flood risk management plan datasheet 
Kilbirnie and Glengarnock (target area 97) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the studies
supporting the present development of the Upper Garnock Flood Protection Scheme. There is a long record of
flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes
©Crown copyright. All rights reserved. NAC lic no. 100023393
Kilbirnie and Glengarnock are located near Kilbirnie
Loch at the banks of the River Garnock. They are
located within the North Ayrshire local authority area.
The main sources of flooding in this area are river and
surface water flooding. There are approximately 2,100
people and 1,200 homes and businesses currently at
risk of flooding. This is likely to increase to 2,400
people and 1,300 homes and businesses by the
2080s due to climate change.
DRAFT
Appendix 2

Page 291

60 
Objective ref Objective type Objective Description
971 Avoid flood risk Avoid inappropriate development that increases flood risk
in Kilbirnie and Glengarnock
972 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Kilbirnie and Glengarnock
973 Reduce flood risk Reduce the risk of surface water and river flooding in
Kilbirnie and Glengarnock 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities.
Actions proposed to start between 2022 and 2028 
Flood scheme or works implementation (9701)
Action The flood scheme is currently under construction.
Description The flood scheme in north of Kilbirnie involves the construction of the flood
storage dam across the River Garnock at Greenridge and Langlands
Farms just north of Kilbirnie. This will temporarily reduce river flow during
periods of high rainfall, to reduce flood risk to properties downstream.
Works at Paddockholm Industrial Estate Kilbirnie include the reinstatement
of flood defence walls and the construction of a new flood defence
embankment, in order to reduce flood risk to this area. Works at Powgree
Burn, Glengarnock include the construction of a formal flood defence wall
adjacent to the Powgree Burn and the Glendale Arms.
Delivery Lead North Ayrshire Council.
Indicative Delivery The Upper Garnock Flood Protection Scheme is under construction, which
will be completed in the early part of Cycle 2.
Funding 80% of eligible scheme costs qualify for Scottish Government grant
funding. The remaining 20% of eligible costs and any other associated
costs shall be met by North Ayrshire Council's budget.
Coordination North Ayrshire Council will coordinate with SEPA, Scottish Water, local
residents, landowners and other stakeholders throughout the
implementation of the flood scheme. SEPA will work with the local authority
on the potential to coordinate this action with an update to SFDAD and
flood warning actions.
Local Detail The Flood Protection Scheme measures in this target area shall be fully
implemented by the end of 2022 / first half of 2023.
DRAFT
Appendix 2

Page 292

61 
Community engagement (9702)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description The local flood risk management plans published in December 2022 will
establish further detail on the actions.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding This action shall be funded through North Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership.
Local Detail North Ayrshire Council shall update the relevant community flood resilience
plan to account for expected changes in flood risk over the lifespan of the
Flood Protection Scheme. 
Flood study (9703)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description The existing models for the flood protection scheme should be reviewed
and flood warning operations to assess the existence of any residual risks
from river, surface water and sewer sources. The impacts of climate
change on flood risk should be evaluated. If flood risk is confirmed, scoping
of the next steps should be completed.
Delivery Lead North Ayrshire Council.
Indicative Delivery This study will be delivered during the first half of Cycle 2 (2022 - 2025).
Funding This study will be funded through North Ayrshire Council's budget provided
by the Scottish Government.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
SEPA will work with the local authority on the potential to coordinate this
action with flood warning actions.
Local Detail Following the completion of the Upper Garnock Flood Protection Scheme,
this study shall investigate residual flood risk from all sources within
Kilbirnie and Glengarnock.
Where flood risk is confirmed, a second phase of the study shall be
commissioned to scope the next steps towards reducing flood risk. DRAFT
Appendix 2

Page 293

62 
Flood study (options appraisal) (9704)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed.
Description A natural flood management study for the Upper Garnock has already
been completed. 
The objective of the natural flood management study is to investigate the
potential benefit of runoff control and sediment management in the
catchments of the River Garnock tributaries around Kilbirnie and
Glengarnock in order to contribute to the reduction of risk of river and
surface water flooding to residential properties and non-residential
properties in Kilbirnie, Glengarnock and Longbar. 
The completed study has identified opportunities for natural flood
management and has assessed their effectiveness. 
Delivery Lead  North Ayrshire Council
Indicative Delivery This study was completed before the Local Flood Risk Management Plan
publication date.
Funding This completed study was funded through North Ayrshire Council's budget
provided by Scottish Government.
Coordination SEPA will work with the local authority on the potential to coordinate the
findings of the study with flood warning actions.
Local Detail The second phase of the Upper Garnock Natural Flood Management Study
is complete. The findings of the study shall be shared with stakeholders to
help support any prospective funding bid for the design and implementation
of any of the measures contained in the study.
DRAFT
Appendix 2

Page 294

63 
Sewer flood risk assessment (9705)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Stevenston sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water
Indicative Delivery 2025-2027
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Stevenston
Point sewer catchment to improve knowledge and understanding of
flood risk in this area as required under Section 16 of the Flood Risk
Management (Scotland) Act 2009. 
Flood warning maintenance (9706)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the River Garnock flood warning scheme. The
scheme should be investigated for improvement and/or recalibration.
Delivery Lead SEPA.
Indicative Delivery Second half of cycle.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with North Ayrshire Council on the potential coordinate
flood warning improvements with flood scheme and flood studies work.
SEPA will continue to raise awareness of flood warning, and engage with
communities about the service when require
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 295

64 
02/12/04 (Lower Irvine and Annick Water catchment) 
This area is designated as a potentially vulnerable area due to flood risk to Dundonald,
Irvine and Stewarton. The main sources of flooding are from the River Irvine and Annick
water and from surface water. Recent floods have been caused by surface water flooding. 
There are 3 target areas in this potentially vulnerable area, which have been the focus of
further assessment, these are listed below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Irvine (target area 21)
Stewarton (target area 122)
Dundonald (target area 21001) 
DRAFT
Appendix 2

Page 296

65 
Summary Location map
Flood risk management plan datasheet 
Irvine (target area 21) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Lower
Irvine flood study (2019) and for coastal flooding by the shoreline management plan. Understanding has also
improved for surface water as a result of the integrated catchment study which also assessed the interactions
between the different flood sources. There is a long record of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. Consider whole catchments and coastlines and work
with natural processes and the environment to deliver multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Irvine covers the majority of the town of Irvine and
includes the River Irvine, Annick Water and Red Burn.
The area is located within the North Ayrshire local
authority area. The main source of flooding in the area
is river flooding, however there is also risk from
coastal and surface water flooding. There are around
3,700 people and 2,100 homes and businesses at risk
from flooding. This is likely to increase to 4,100 people
and 2,300 homes and businesses by the 2080s due to
climate change.
DRAFT
Appendix 2

Page 297

66 
Objective ref Objective type Objective Description
211 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Irvine Waterside Flood
Embankment Flood Protection Scheme
212 Avoid flood risk Avoid inappropriate development that increases flood risk
in Irvine
213 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Irvine
214 Reduce flood risk Reduce the risk of flooding in Irvine 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
DRAFT
Appendix 2

Page 298

67 
Flood scheme or works design (2101)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed. The performance and condition of the existing
flood defences is to be evaluated, including consideration of the likely
impacts of climate change. This should guide adaptive planning to allow for
the impacts of climate change to be monitored, understood and managed.
Description North Ayrshire Council to develop detailed design of the Lower Irvine
Valley Flood Scheme, based on the preferred option from the flood study
and public engagement. The preferred option consists of a combination of
property level direct defences in the form of flood walls and flood
embankment.
Following the outputs from the Lower River Irvine flood study on the
present performance of the Waterside Flood Protection Scheme, the study
should focus primarily on establishing the predicted standard of protection
for a number of climate change scenarios. This information will underpin
the development of an adaptation plan for the long term protection of the
community.
The responsible authority proposes this action as the best viable option for
managing flood risk in this community. The delivery of this action is subject
to capital funding being made available.
Delivery Lead North Ayrshire Council.
Indicative Delivery The flood scheme design shall be completed during Cycle 2 (2022 - 2028).
The delivery of this action is subject to Scottish Government capital grant
funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination North Ayrshire Council will coordinate with SEPA, Scottish Water, local
residents, landowners and other stakeholders throughout the design
development of the flood scheme.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping.
Local Detail The detailed design for the Lower Irvine Flood Protection Scheme is to
include the predicted standard of protection of the existing Waterside Flood
Protection Scheme for a number of climate change scenarios. This
information will support a climate change adaptive plan for this flood
protection asset. 
North Ayrshire Council proposes this action as the best viable option for
managing flood risk in this community. DRAFT
Appendix 2

Page 299

68 
Community engagement (2102)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description North Ayrshire Council to carry out community engagement linked to the
proposed (funding dependant) Lower River Irvine Flood Scheme. A
community engagement plan will be created to cover the time period from
detailed design to implementation of the flood protection solution. The
delivery of this action is subject to capital funding being made available.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified through the development of the
detailed design and the implementation of the Lower River Irvine Flood
Protection Scheme. 
Sewer flood risk assessment (2103)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009.
DRAFT
Appendix 2

Page 300

69 
Flood defence maintenance (2104)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description North Ayrshire Council is to continue to inspect and maintain the Irvine
Waterside Flood Embankment Flood Protection Scheme.
Delivery Lead North Ayrshire Council.
Indicative Delivery Flood defence maintenance will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding Maintenance works as required will be funded through North Ayrshire
Council's budget provided by Scottish Government.
Coordination North Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail North Ayrshire Council shall continue to inspect and maintain the Irvine
Waterside Flood Embankment Protection Scheme. 
Flood warning maintenance (2105)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Ayr, Annick and Irvine flood warning schemes.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will maintain the Ayr, Annick and Irvine flood warning schemes.
SEPA will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 301

70 
Strategic mapping improvements (2106)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 302

71 
Summary Location map
Flood risk management plan datasheet 
Stewarton (target area 122) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers, and
surface water sources. The national level assessment is improved for river flooding by the flood warning scheme
and for surface water flooding by the sewer flood risk assessment. Together, this information has highlighted the
risk of flooding in this area. Stewarton has therefore been identified as a new target area for the 2021 flood risk
management plans. There are periodic records of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Stewarton is a town in East Ayrshire Council area
located on the banks of Annick Water. The main
sources of flooding in Stewarton are river and surface
water flooding. There are approximately 160 people
and 80 homes and businesses currently at risk from
flooding. This is likely to increase to 230 people and
110 homes and businesses by the 2080s due to
climate change.
DRAFT
Appendix 2

Page 303

72 
Objective ref Objective type Objective Description
1221 Avoid flood risk Avoid inappropriate development that increases flood risk
in Stewarton
1222 Improve data and
understanding
Improve data and understanding of river flooding in
Stewarton
1223 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Stewarton
1224 Reduce flood risk Reduce the risk of surface water flooding in Stewarton 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Data collection (12201)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description Data collection and monitoring will be carried out to inform the basis of
future studies.
Delivery Lead Action delivery lead is East Ayrshire Council and coordination will be
determined once the actions have been finalised.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council.
SEPA will work with the local authority on the potential to coordinate
opportunities for joint data collection activities.
Local Detail East Ayrshire Council shall continue to liaise with SEPA and utilise SEPA
gauge information available for this catchment, as required.
DRAFT
Appendix 2

Page 304

73 
Flood warning maintenance (12202)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Ayr Annick and Irvine flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will maintain the Ayr, Annick and Irvine flood warning schemes.
SEPA will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A. 
Sewer flood risk assessment (12203)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Stewarton sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2024-2026.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 305

74 
Surface water management plan (12204)
Action Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system are
to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead East Ayrshire Council/Scottish Water
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding The surface water flood risk options appraisal will be funded through East
Ayrshire Council's budget provided by Scottish Government or funded by
Scottish Water's budget as appropriate.
Coordination East Ayrshire Council, Scottish Water and SEPA.
Local Detail Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 306

75 
Summary Location map
Flood risk management plan datasheet 
Dundonald (target area 21001) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by
information from the floods that occurred in summer 2019. Before this floods there were periodic records of
flooding in the Dundonald area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The village of Dundonald is located in the west of
Scotland. The area is located within the South
Ayrshire Council area. The main source of flooding in
Dundonald is surface water flooding. There are
approximately 160 people and 80 homes and
businesses currently at risk from flooding. This is likely
to increase to 170 people and 90 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 307

76 
Objective ref Objective type Objective Description
210011 Avoid flood risk Avoid inappropriate development that increases flood risk
in Dundonald
210012 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Dundonald
210013 Reduce flood risk Reduce the risk of surface water flooding in Dundonald 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. The local flood risk management plan published in 2022 provides more information on
the actions, their timing and how they will be funded and coordinated. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Sewer flood risk assessment (2100101)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 308

77 
Flood scheme or works design (2100102)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description South Ayrshire Council to implement the surface water management plan
working with Scottish water as appropriate. Following completion of the
study detailed design to be developed for surface water management in
Dundonald, based on the preferred option from the appraisal process.
Delivery Lead Action delivery lead is South Ayrshire Council in coordination with Scottish
Water.
Indicative Delivery Cycle 2 (2022 - 2028).
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination This action will be lead by South Ayrshire Council in coordination with
Scottish Water.
Local Detail South Ayrshire Council to implement the surface water management plan
working with Scottish water as appropriate. Following completion of the
study detailed design to be developed for surface water management in
Dundonald, based on the preferred option from the appraisal process. 
Community engagement (2100103)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Detailed design for the surface water management measures should be
carried out in conjunction with community engagement where issues,
constraints, aspirations and opportunities are identified. A community
engagement plan should be created to cover the time period from detailed
design to implementation of the preferred flood risk management option.
Delivery Lead South Ayrshire Council
Indicative Delivery Cycle 3 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the flood protection solution.
DRAFT
Appendix 2

Page 309

78 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk information is
developed and updated for all areas. A description of these actions is included in the Local Plan District section at
the start of this document.
DRAFT
Appendix 2

Page 310

79 
02/12/05 (Irvine to Troon) 
This area is designated as a potentially vulnerable area due to flood risk to Irvine and Troon.
The main sources of flooding are from coastal and river. Recent coastal flooding has
occurred in the area. 
There are 2 target areas in this potentially vulnerable area, which have been the focus of
further assessment, these are listed below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Irvine Coastal (target area 22)
Troon (target area 123) 
DRAFT
Appendix 2

Page 311

80 
Summary Location map
Flood risk management plan datasheet 
Irvine Coastal (target area 22) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Lower
Irvine flood study (2019) and for coastal flooding by the shoreline management plan. Understanding has also
improved for surface water as a result of the integrated catchment study which also assessed the interactions
between the different flood sources. There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Irvine coastal covers the coastal area of the town of
Irvine. The area is located within the North Ayrshire
local authority area. The main source of flooding in the
area is river flooding, however there are also risks
from coastal and surface water flooding. There are
approximately 1,100 people and 640 homes and
businesses at risk from flooding, which is a significant
proportion of the community. This is estimated to
increase to 1,200 people and 760 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 312

81 
Objective ref Objective type Objective Description
221 Avoid flood risk Avoid inappropriate development that increases flood risk
in Irvine
222 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Irvine 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood study (2201)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description North Ayrshire Council to carry out a flood study to investigate the
feasibility of natural flood management measures in the catchment to
address flood risk and coastal erosion.
Delivery Lead North Ayrshire Council.
Indicative Delivery This study will be delivered during the second half of Cycle 2 (2025 - 2028).
Funding This study will be funded through North Ayrshire Council's budget provided
by Scottish Government.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping.
Local Detail This study shall investigate the feasibility of Natural Flood Management
(NFM) measures to address flood risk coastal erosion, building on the
findings identified by the completed Ayrshire Shoreline Management
Plan.
DRAFT
Appendix 2

Page 313

82 
Sewer flood risk assessment (2202)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Shoreline management plan (coastal adaptive plan) (2203)
Action The existing assessment of coastal flood and erosion risk is to be reviewed
and updated as required. The plan should include assessment of climate
change and develop adaptive approaches to allow for the impacts of climate
change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will work with other relevant responsible authorities,
statutory bodies and key stakeholders identified through the scoping stage of
the planned update to the shoreline management plan.
Local Detail Details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 314

multiple outcomes. 
Summary Location map
Flood risk management plan datasheet 
Troon (target area 123) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment and integrated catchment study, which also assesses the interactions between the
different flood sources. Understanding is improved for coastal flooding by the shoreline management plan.
There is a long record of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources.
• Consider whole catchments and coastlines and work wi8t3h natural processes and the environment to deliver
©Crown copyright. All rights reserved. NAC lic no. 100023393
Troon is located on the west coast of Scotland within
the North Ayrshire and South Ayrshire Council areas.
The main source of flooding in Troon is from coastal
flooding, however there are also risks from river and
surface water flooding. There are approximately 3,000
people and 1,800 homes and businesses at risk from
flooding. This is likely to increase to 4,000 people and
2,300 properties by the 2080s due to climate change.
DRAFT
Appendix 2

Page 315

84 
Objective ref Objective type Objective Description
1231 Avoid flood risk Avoid an increase in flood risk in Troon by the appropriate
protection, management and maintenance of sand dunes
1232 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Troon coastal defences
1233 Avoid flood risk Avoid inappropriate development that increases flood risk
in Troon
1234 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Troon
1235 Reduce flood risk Reduce the risk of flooding in Troon 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood study (12301)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to address coastal flood risk in Troon.
The shoreline management plan and operation of the existing defences,
sand dunes and flood warning should be reviewed to ascertain the
requirements of the flood study. The impacts of climate change on flood
risk should be evaluated. The interactivity between coastal flooding and
other sources of flooding should be assessed. If flood risk is confirmed,
scoping of the next steps should be completed.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping and flood warning actions.
Local Detail The flood modelling being carried out for Troon Coastal Flood Study will
be reviewed. Where flood risk is confirmed, scoping of the next steps will
be completed. DRAFT
Appendix 2

Page 316

85 
Flood study (existing flood defences) (12302)
Action The performance and condition of the existing flood defences are to be
evaluated, including consideration of the likely impacts of climate change.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Description A study of the existing Troon Coastal Defences to be carried out following
the outcomes of the coastal flood study. The study should establish the
predicted standard of protection for a number of climate change scenarios.
This information will underpin the development of an adaptation plan for the
long term protection of the community.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA.
SEPA will work with the local authority on the potential to coordinate this
action with an update to SFDAD and work on coastal flood mapping.
Local Detail Detailed survey and flood modelling will be carried out for the Troon
Coastal Flood Study. The outcomes of the study will underpin the
development of an adaption plan for the long term protection of the
community. 
Flood defence maintenance (12303)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description South Ayrshire Council is to continue to inspect and maintain the Troon
coastal defences and sand dunes. The maintenance regime should be
made based on the findings of the flood study.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding Maintenance works as required will be funded through South Ayrshire
Council's budget provided by Scottish Government.
Coordination South Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail South Ayrshire Council shall continue to inspect and maintain the Troon
coastal defences. The maintenance regime should be made based on the
findings of the annual inspection programme and proposed coastal flood
study.
DRAFT
Appendix 2

Page 317

86 
Sewer flood risk assessment (12304)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Flood warning maintenance (12305)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 318

87 
Strategic mapping improvements (12306)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 319

88 
02/12/06 (Kilmarnock and Upper Irvine catchment) 
This area is designated as a potentially vulnerable area due to flood risk in Kilmarnock,
Galston and Newmilns. The main sources of flooding are from the River Irvine and
Kilmarnock Water, and surface water in the main towns. Recent flooding has occurred,
which was due to both river and surface water. 
There are 6 target areas in this potentially vulnerable area, which have been the focus of
further assessment, these are listed below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Kilmarnock (target area 20)
Crosshouse (target area 75)
Newmilns (target area 120)
Kilmaurs (target area 147)
Galston (target area 153)
Darvel (target area 154) 
DRAFT
Appendix 2

Page 320

89 
Summary Location map
Flood risk management plan datasheet 
Kilmarnock (target area 20) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Irvine
Valley flood study (2019). Understanding has also improved as a result of the integrated catchment study which
assessed the interactions between the different flood sources. There are frequent records of flooding in this
target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The town of Kilmarnock is located on the banks of the
Kilmarnock Water and the River Irvine. The area is
located within the East Ayrshire Council area. The
main source of flooding in Kilmarnock is river flooding,
however there is also a risk from surface water
flooding. There are approximately 3,800 people and
2,400 homes and businesses at risk from flooding.
This is estimated to increase to 4,900 people and
3,000 homes and businesses by the 2080s due to
climate change.
DRAFT
Appendix 2

Page 321

Objective ref Objective type Objective Description
201 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Kilmarnock flood
protection scheme 2001
202 Avoid flood risk Avoid inappropriate development that increases flood risk
in Kilmarnock
203 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Kilmarnock
204 Reduce flood risk Reduce the risk of flooding in Kilmarnock 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (2001)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed. The performance and condition of the existing
flood defences is to be evaluated, including consideration of the likely
impacts of climate change. This should guide adaptive planning to allow for
the impacts of climate change to be monitored, understood and managed.
Description East Ayrshire Council to develop detail design for the Upper Irvine Flood
Protection Scheme based on the preferred option from the Upper Irvine
flood Study (2018). The detail design is to include the predicted standard of
protection of the Kilmarnock Flood Protection Scheme 2001 for a number
of climate change scenarios. This information will support a climate change
adaptive plan for this flood protection asset.
The responsible authority proposes this action as the best viable option for
managing flood risk in this community. The delivery of this action is subject
to capital funding being made available.
Delivery Lead East Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, North Ayrshire Council and SEPA.
Local Detail The detail design for the Upper Irvine Flood Protection Scheme is to
include the predicted standard of protection of the existing Kilmarnock
Flood Protection Scheme9(02001) for a number of climate change scenarios.
DRAFT
Appendix 2

Page 322

91 
Community engagement (2002)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description The detailed design of the Upper Irvine Flood Protection Scheme (funding
dependant) should be carried out in conjunction with community
engagement where issues, constraints, aspirations and opportunities are
identified. A community engagement plan should be created to cover the
time period from detailed design to implement action of the flood protection
solution.
Delivery Lead East Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the flood protection solution. 
Flood defence maintenance (2003)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description East Ayrshire Council is to continue to inspect and maintain the Kilmarnock
Flood Protection Scheme 2001. The maintenance regime should be
informed by the outcomes of the flood study.
Delivery Lead East Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028).
Funding Maintenance works as required will be funded through East Ayrshire
Council's budget provided by Scottish Government.
Coordination East Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail East Ayrshire Council shall continue to inspect and maintain the
Kilmarnock Flood Protection Scheme (2001). The maintenance regime
should be informed by the outcomes of the flood study.
This information will support a climate adaptive plan for this flood protection
asset. 
East Ayrshire Council proposes this action as the best viable option for
managing flood risk in this community.
DRAFT
Appendix 2

Page 323

92 
Sewer flood risk assessment (2004)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Flood study (options appraisal) (2005)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed.
Description Following the completion of the surface water management plan and
Meadowhead integrated catchment study, surface water flood risk options
appraisal should be developed for this target area.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding The surface water flood risk options appraisal will be funded through East
Ayrshire Council's budget provided by Scottish Government or funded by
Scottish Water's budget as appropriate.
Coordination East Ayrshire Council, Scottish Water and SEPA.
Local Detail The surface water management plan and the Meadowhead integrated
catchment study were completed in Cycle 1 (2016 - 2022). The reduction
of surface water flood risk options shall be progressed.
DRAFT
Appendix 2

Page 324

93 
Flood warning maintenance (2006)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Ayr, Annick and Irvine flood warning schemes.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will maintain the Ayr, Annick and Irvine flood warning schemes.
SEPA will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 325

94 
Summary Location map
Flood risk management plan datasheet 
Crosshouse (target area 75) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the risk of flooding in this area.
Crosshouse has therefore been identified as a new target area for the 2021 flood risk management plans.
There are periodic records of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Crosshouse is a village located approximately 7km
east of Irvine. The area is within the East Ayrshire
Council area. The main source of flooding in
Crosshouse is river flooding, however there is also a
risk from surface water flooding. There are
approximately 160 people and 100 homes and
businesses currently at risk from flooding. This is
estimated to increase to 190 people and 120 homes
and businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 326

95 
Objective ref Objective type Objective Description
751 Avoid flood risk Avoid inappropriate development that increases flood risk
in Crosshouse
752 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Crosshouse
753 Reduce flood risk Reduce the risk of flooding in Crosshouse 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Data collection (7501)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description The local flood risk management plans published in December 2022 will
establish further detail on the actions.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council.
SEPA will work with the local authority on the potential to coordinate
opportunities for joint data collection activities.
Local Detail East Ayrshire Council shall continue to liaise with SEPA and utilise SEPA
gauge information available for this catchment, as required.
DRAFT
Appendix 2

Page 327

96 
Sewer flood risk assessment (7502)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Flood study (7503)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description East Ayrshire Council to carry out a flood study to address risk from river
and surface water at Crosshouse. The flood modelling carried out for the
River Irvine Flood Study should be reviewed to assess any further flood
modelling requirements. The interactivity between surface water and river
flooding should be assessed. The impacts of climate change on flood risk
should be evaluated. If flood risk is confirmed, scoping of the next steps
should be completed.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action will be funded through East Ayrshire Council and South
Ayrshire Councils' budgets provided by Scottish Government, subject to
any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail The flood modelling carried out for the River Irvine Flood Study should be
reviewed to assess any further flood modelling requirements. The
interactivity between surface water and river flooding should be assessed.
The impacts of climate change on flood risk should be evaluated. If flood
risk is confirmed, scoping of the next steps will be completed.
DRAFT
Appendix 2

Page 328

97 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 329

98 
Summary Location map
Flood risk management plan datasheet 
Newmilns (target area 120) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Irvine
Valley flood study (2019) and for surface water flooding by the sewer flood risk assessment. There are frequent
records of flooding in this target area, most notably in July 2007. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Newmilns and Greenholm are small villages within
East Ayrshire Council area. The main source of
flooding in Newmilns is river flooding, however there is
also risk from surface water flooding. There are
approximately 1,500 people and 770 homes and
businesses currently at risk from flooding, which is a
significant proportion of the community. This is likely
to increase to 1,600 people and 840 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 330

99 
Objective ref Objective type Objective Description
1201 Avoid flood risk Avoid inappropriate development that increases flood risk
in Newmilns
1202 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Newmilns
1203 Reduce flood risk Reduce the risk of flooding in Newmilns 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (12001)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description East Ayrshire Council to develop detailed design for Upper Irvine Flood
Protection Scheme based on the preferred option from the flood study.
The responsible authority proposes this action as the best viable option for
managing flood risk in this community. The delivery of this action is subject
to capital funding being made available.
Delivery Lead Action delivery lead is East Ayrshire Council in coordination with SEPA.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, North Ayrshire Council and SEPA.
SEPA will work with the local authority on the potential to coordinate this
action with flood warning actions.
Local Detail Subject to SG funding being available, East Ayrshire Council to develop
detailed design for Upper Irvine Flood Protection Scheme based on the
preferred option from the flood study.
DRAFT
Appendix 2

Page 331

100 
Community engagement (12002)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description The detailed design of the Upper Irvine Flood Protection Scheme (funding
dependant) should be carried out in conjunction with community
engagement where issues, constraints, aspirations and opportunities are
identified. A community engagement plan should be created to cover the
time period from detailed design to implement action of the flood protection
solution.
Delivery Lead East Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the flood protection solution. 
Flood warning scoping (12003)
Action The potential to provide a new flood warning scheme is to be considered
by SEPA. Flood warnings are only effective where it is possible to send a
warning message with sufficient time to allow communities to take
appropriate actions before flooding occurs.
Description Scoping for a river flood warning scheme will be carried out in Newmilns.
Delivery Lead SEPA.
Indicative Delivery Second half of cycle 2.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with East Ayrshire Council on the potential to coordinate
flood warning development with the Upper Irvine flood scheme works.
Local Detail N/A.
DRAFT
Appendix 2

Page 332

101 
Sewer flood risk assessment (12004)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Surface water management plan (12005)
Action Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system are
to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead East Ayrshire Council/Scottish Water
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding The surface water flood risk options appraisal will be funded through East
Ayrshire Council's budget provided by Scottish Government or funded by
Scottish Water's budget as appropriate.
Coordination East Ayrshire Council will work with Scottish Water to identify which
organisation should lead on managing surface water flood risk in each
identified priority area, with information provided by SEPA where required.
Local Detail Further details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 333

102 
Summary Location map
Flood risk management plan datasheet 
Kilmaurs (target area 147) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment. Together, this information has highlighted the risk of flooding in this area.
Kilmaurs has therefore been identified as a new target area for the 2021 flood risk management plans. There
are limited records of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The area covers the village of Kilmaurs which is
located outside of Kilmarnock. It is in the East Ayrshire
Council area. The main sources of flooding in
Kilmaurs are river and surface water flooding. There
are approximately 160 people and 100 homes and
businesses currently at risk from flooding. This is
estimated to increase to 180 people and 110 homes
and businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 334

103 
Objective ref Objective type Objective Description
1471 Avoid flood risk Avoid inappropriate development that increases flood risk
in Kilmaurs
1472 Improve data and
understanding
Improve data and understanding of flooding in Kilmaurs
1473 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Kilmaurs 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Data collection (14701)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description Data collection and monitoring will be carried out to inform the basis of
future studies.
Delivery Lead Action delivery lead is East Ayrshire Council and coordination will be
determined once the actions have been finalised.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council and SEPA will work together on the potential to
coordinate opportunities for joint data collection activities.
Local Detail East Ayrshire Council shall continue to liaise with SEPA and utilise SEPA
gauge information available for this catchment, as required.
DRAFT
Appendix 2

Page 335

104 
Sewer flood risk assessment (14702)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Flood study (14703)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action will be funded through East Ayrshire Council and South
Ayrshire Councils' budgets provided by Scottish Government, subject to
any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail The flood modelling will be carried out for the Carmel Water Flood Study
informed by data gathering in Cycle 2. Where flood risk is confirmed,
scoping of the next steps will be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 336

105 
Summary Location map
Flood risk management plan datasheet 
Galston (target area 153) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Irvine
Valley flood study (2019) and for surface water by the sewer flood risk assessment. There is a long record of
flooding in this target area, most notably in August 2012. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The town of Galston and the village of Burnhouse are
located south of the River Irvine. The area is located
within the East Ayrshire Council area. The main
source of flooding in Galston is river flooding (Burn
Anne), however there is also a risk from surface water
flooding. There are approximately 870 people and 500
homes and businesses at risk from flooding. This is
estimated to increase to 980 people and 550 homes
and businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 337

106 
Objective ref Objective type Objective Description
1531 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Galston flood protection
scheme 2008
1532 Avoid flood risk Avoid inappropriate development that increases flood risk
in Galston
1533 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Galston
1534 Reduce flood risk Reduce the risk of flooding in Galston 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (15301)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed. The performance and condition of the existing
flood defences is to be evaluated, including consideration of the likely
impacts of climate change. This should guide adaptive planning to allow for
the impacts of climate change to be monitored, understood and managed.
Description East Ayrshire Council to develop detail design for the Upper Irvine Flood
Protection Scheme based on the preferred option from the Upper Irvine
flood Study (2018). The detail design is to include the predicted standard of
protection of the Galston Flood Protection Scheme 2008 for a number of
climate change scenarios. This information will support a climate change
adaptive plan for this flood protection asset.
The responsible authority proposes this action as the best viable option for
managing flood risk in this community. The delivery of this action is subject
to capital funding being made available.
Delivery Lead Action delivery lead is East Ayrshire Council in coordination with SEPA.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, North Ayrshire Council and SEPA.
Local Detail Subject to SG funding being available, East Ayrshire Council to develop
detailed design for Upper Irvine Flood Protection Scheme based on the
preferred option from the flood study.
DRAFT
Appendix 2

Page 338

107 
Community engagement (15302)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description The detailed design of the Upper Irvine Flood Protection Scheme (funding
dependant) should be carried out in conjunction with community
engagement where issues, constraints, aspirations and opportunities are
identified. A community engagement plan should be created to cover the
time period from detailed design to implement action of the flood protection
solution.
Delivery Lead East Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the flood protection solution. 
Flood defence maintenance (15303)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description East Ayrshire Council is to continue to inspect and maintain the Galston
Flood Protection Scheme 2008. The maintenance regime should be
informed by the outcomes of the flood study.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail The flood modelling being carried out for the River Irvine Flood Study will
be reviewed. Where flood risk is confirmed, scoping of the next steps will
be completed. DRAFT
Appendix 2

Page 339

108 
Sewer flood risk assessment (15304)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Surface water management plan (15305)
Action Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system are
to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead East Ayrshire Council/Scottish Water
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding The surface water flood risk options appraisal will be funded through East
Ayrshire Council's budget provided by Scottish Government or funded by
Scottish Water's budget as appropriate.
Coordination East Ayrshire Council will work with Scottish Water to identify which
organisation should lead on managing surface water flood risk in each
identified priority area with information provided by SEPA.
Local Detail Further details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 340

109 
Summary Location map
Flood risk management plan datasheet 
Darvel (target area 154) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Irvine
Valley flood study (2019) and for surface water by the sewer flood risk assessment. Together, this information
has highlighted the risk of flooding in this area. Darvel has therefore been identified as a new target area for the
2021 flood risk management plans. There are limited records of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Darvel is a small town on banks of the River Irvine
within East Ayrshire Council area. The main source of
flooding in Darvel is surface water flooding, however
there is also risk of river flooding. There are
approximately 360 people and 190 properties at risk
from flooding. This is likely to increase to 510 people
and 260 properties by the 2080s due to climate
change.
DRAFT
Appendix 2

Page 341

110 
Objective ref Objective type Objective Description
1541 Avoid flood risk Avoid inappropriate development that increases flood risk
in Darvel
1542 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Darvel
1543 Reduce flood risk Reduce the risk of flooding in Darvel 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (15401)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description East Ayrshire Council should develop a detailed design for Upper Irvine
Flood Protection Scheme based on the preferred option from the flood
study. The responsible authority proposes this action as the best viable
option for managing flood risk in this community. The delivery of this action
is subject to capital funding being made available.
Delivery Lead Action delivery lead is East Ayrshire Council in coordination with SEPA.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, North Ayrshire Council and SEPA.
Local Detail Subject to Scottish Government funding being available, East Ayrshire
Council to develop detailed design for Upper Irvine Flood Protection
Scheme based on the preferred option from the flood study.
DRAFT
Appendix 2

Page 342

111 
Community engagement (15402)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description The detailed design of the Upper Irvine Flood Protection Scheme (funding
dependant) should be carried out in conjunction with community
engagement where issues, constraints, aspirations and opportunities are
identified. A community engagement plan should be created to cover the
time period from detailed design to implement action of the flood protection
solution.
Delivery Lead East Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination East Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the flood protection solution. 
Sewer flood risk assessment (15403)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009.
DRAFT
Appendix 2

Page 343

112 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Surface water management plan (15404)
Action Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system are
to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead East Ayrshire Council/Scottish Water
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding The surface water flood risk options appraisal will be funded through East
Ayrshire Council's budget provided by Scottish Government or funded by
Scottish Water's budget as appropriate.
Coordination East Ayrshire Council will work with Scottish Water to identify which
organisation should lead on managing surface water flood risk in each
identified priority area with information provided by SEPA.
Local Detail Further details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 344

113 
02/12/07 (Pow Burn catchment) 
This area is designated as a potentially vulnerable area due to flood risk to Prestwick. The
main source of flooding is from the Pow Burn, with also some risk from surface water
flooding. There is a history of flooding in the area, with recent flooding being caused by both
river and surface water flooding. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Prestwick north (target area 28) 
DRAFT
Appendix 2

Page 345

114 
Summary Location map
Flood risk management plan datasheet 
Prestwick north (target area 28) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
Prestwick Strategic Drainage Project (Flood Heat Mapping Phase 2) (2019) and sewer flood risk assessment.
There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Prestwick North covers the northern area of the town
of Prestwick, which is mostly an inland area. The area
is located within the South Ayrshire Council area. The
main source of flooding in Prestwick North is river
flooding, however there is also a risk from surface
water flooding. There are approximately 1,200 people
and 690 homes and businesses at risk from flooding
and approximately. This is estimated to increase to
1,400 people and 780 homes and businesses by the
2080s due to climate change.
DRAFT
Appendix 2

Page 346

Objective ref Objective type Objective Description
281 Avoid flood risk Avoid inappropriate development that increases flood risk
in Prestwick
282 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of all existing flood
protection structures
283 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Prestwick
284 Reduce flood risk Reduce the risk of surface water and river flooding in
Prestwick 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (2801)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description Following completion of the options appraisal flood study for the Prestwick
Strategic Drainage Project, Scottish Water will develop detailed design for
surface water management in Prestwick, based on the preferred options
from the appraisal process, working closely with South Ayrshire Council.
Delivery Lead Scottish Water in collaboration with South Ayrshire Council.
Indicative Delivery 2022-2035.
This action will cover multiple FRM cycles
(Phase 1 of Prestwick Strategy is targetted to be implemented during
period 2022 ro 2027 but this will be dependent on securing funding and
obtaining any necessary agreements from third parties).
Funding Scottish Water has approved funding to further develop design on the first
phase of actions to reduce sewer and surface water flooding in Prestwick.
This includes upgrading and reconfiguring parts of the sewer network and
delivering blue-green infrastructure at an estimated capital cost for delivery
of circa £12m. Upon completion of detailed design the delivery costs will
be re-assessed and progressed through the next stage of Scottish Water's
Investment Appraisal Process to determine if the project can proceed to
construction.
Coordination Surface water flood risk has shared responsibilities across multiple
agencies. Therefore co-ordination with the local authority, businesses and
residents is essential and action will be required from multiple agencies for
the Prestwick Strategic Drainage Project to be delivered. 
Progress will continue to be communicated with the Prestwick flooding
stakeholder group which 1w15as established in Cycle 1. This includes
DRAFT
Appendix 2

Page 347

116 
representation from MP, MSP, Councillors, Community Councillors and
PRAAF community flood group.
Local Detail The Prestwick Strategic Drainage Project has identified options to reduce
flood risk across the town. The options consist of a variety of measures
ranging from significant sewer infrastructure upgrades, to localised blue-
green infrastructure and property level surface water disconnection. 
Due to the significant cost of the number and scale of options, it is likely to
require improvements to be delivered in a phased manner over a number
of FRM cycles. This approach will enable further funding to be sought for
future phases of work and ensure that actions can be planned to minimise
disruption to the town. 
Flood scheme or works design (2802)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description Following completion of the options appraisal flood study for the Prestwick
Strategic Drainage Project, detailed design to be developed for surface
water management in Prestwick. South Ayrshire Council will explore
options for funding for some of the preferred options identified from the
appraisal process. The delivery of this action is subject to funding being
made available.
Delivery Lead South Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council and Scottish Water.
Local Detail South Ayrshire Council will explore options for funding for some of the
preferred options identified from the appraisal process. The delivery of this
action is subject to funding being made available.
DRAFT
Appendix 2

Page 348

117 
Community engagement (2803)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Detailed design for the surface water management measures should be
carried out in conjunction with community engagement where issues,
constraints, aspirations and opportunities are identified. A community
engagement plan should be created to cover the time period from detailed
design to implementation of the preferred flood risk management option.
Delivery Lead South Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the preferred flood risk management options. 
Flood study (2804)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to improve understanding of river flood
risk from the Pow Burn in Prestwick. The impacts of climate change on
flood risk should be evaluated. If flood risk is confirmed, scoping of the next
steps should be completed.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and Scottish Water.
Local Detail Flood modelling will be carried out for the Pow Burn Flood Study. Where
flood risk is confirmed, scoping of the next steps will be completed.
DRAFT
Appendix 2

Page 349

118 
Sewer flood risk assessment (2805)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA
Local Detail Scottish Water will undertake a modelling
assessment in the Meadowhead sewer catchment to improve knowledge
and
understanding of flood risk in this area as required under Section
16 of the Flood Risk Management (Scotland) Act 2009 
Flood study (existing flood defences) (2806)
Action The performance and condition of the existing flood defences are to be
evaluated, including consideration of the likely impacts of climate change.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Description A study of the existing coastal flood defences (Prestwick Sea Walls) to be
carried out. The study should establish the current and predicted standard
of protection for a number of climate change scenarios. This information
will underpin the development of an adaptation plan for the long term
protection of the community.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA.
SEPA will work with the local authority on the potential to coordinate this
action with an update to SFDAD, work on coastal flood mapping and flood
warning actions.
Local Detail Detailed survey and flood modelling will be carried out for the Prestwick
Coastal Flood Study. The outcomes of the study will underpin the
development of an adaption plan for the long term protection of the
community.
DRAFT
Appendix 2

Page 350

119 
Flood defence maintenance (2807)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description South Ayrshire Council is to continue to inspect and maintain the Prestwick
coastal defences (Prestwick Sea Walls). The maintenance regime should
be made based on the findings of the flood study
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding Maintenance works as required will be funded through South Ayrshire
Council's budget provided by Scottish Government.
Coordination South Ayrshire Council
Local Detail South Ayrshire Council shall continue to inspect and maintain the Prestwick
coastal defences. The maintenance regime should be made based on the
findings of the annual inspection programme and proposed coastal flood
study. 
Flood warning maintenance (2808)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 351

120 
02/12/08 (Prestwick and Ayr) 
This area is designated as a potentially vulnerable area due to flood risk to Ayr and
Prestwick. The main source of flooding is surface water, however there is also risk of
coastal and river flooding. Several floods have been recorded in this area with recent
flooding being caused by coastal flooding. 
There are 2 target areas in this potentially vulnerable area, which have been the focus of
further assessment, these are listed below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Prestwick south (target area 27)
Ayr (target area 71) 
DRAFT
Appendix 2

Page 352

121 
Summary Location map
Flood risk management plan datasheet 
Prestwick south (target area 27) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
Prestwick Strategic Drainage Project (Flood Heat Mapping Phase 2) (2019) and sewer flood risk assessment,
and for coastal flooding by the shoreline management plan. There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The Prestwick South area covers a southern area of
the town of Prestwick, which is mainly coastal. The
area is located within the South Ayrshire Council area.
The main source of flooding in Prestwick South is
surface water flooding, however there is also a risk of
coastal flooding. There are around 840 people at risk
from flooding and approximately 470 homes and
businesses. This is likely to increase to 870 people
and 490 homes and businesses by the 2080s due to
climate change.
DRAFT
Appendix 2

Page 353

122 
Objective ref Objective type Objective Description
271 Avoid flood risk Avoid inappropriate development that increases flood risk
in Prestwick
272 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of all existing flood
protection structures
273 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Prestwick
274 Reduce flood risk Reduce the risk of surface water flooding in Prestwick 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
DRAFT
Appendix 2

Page 354

123 
Flood scheme or works design (2701)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description Following completion of the options appraisal flood study for the Prestwick
Strategic Drainage Project, Scottish Water will develop detailed design for
surface water management in Prestwick, based on the preferred options
from the appraisal process, working closely with South Ayrshire Council.
Delivery Lead Scottish Water in collaboration with South Ayrshire Council.
Indicative Delivery 2022-2035. This action will cover multiple FRM cycles
(Phase 1 of Prestwick Strategy is targetted to be implemented during
period 2022 ro 2027 but this will be dependent on securing funding and
obtaining any necessary agreements from third parties).
Funding Scottish Water has approved funding to further develop design on the first
phase of actions to reduce sewer and surface water flooding in Prestwick.
This includes upgrading and reconfiguring parts of the sewer network and
delivering blue-green infrastructure at an estimated capital cost for delivery
of circa £12m. Upon completion of detailed design the delivery costs will
be re-assessed and progressed through the next stage of Scottish Water's
Investment Appraisal Process to determine if the project can proceed to
construction.
Coordination Surface water flood risk has shared responsibilities across multiple
agencies. Therefore co-ordination with the local authority, businesses and
residents is essential and action will be required from multiple agencies for
the Prestwick Strategic Drainage Project to be delivered.
Progress will continue to be communicated with the Prestwick flooding
stakeholder group which was established in Cycle 1. This includes
representation from MP, MSP, Councillors, Community Councillors and
PRAAF community flood group.
Local Detail The Prestwick Strategic Drainage Project has identified options to reduce
flood risk across the town. The options consist of a variety of measures
ranging from significant sewer infrastructure upgrades, to localised blue-
green infrastructure and property level surface water disconnection.
Due to the significant cost of the number and scale of options, it is likely to
require improvements to be delivered in a phased manner over a number
of FRM cycles. This approach will enable further funding to be sought for
future phases of work and ensure that actions can be planned to minimise
disruption to the town.
DRAFT
Appendix 2

Page 355

124 
Flood scheme or works design (2702)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description Following completion of the options appraisal flood study for the Prestwick
Strategic Drainage Project, detailed design to be developed for surface
water management in Prestwick. South Ayrshire Council will explore
options for funding for some of the preferred options identified from the
appraisal process. The delivery of this action is subject to funding being
made available.
Delivery Lead South Ayrshire Council
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council and Scottish Water.
Local Detail South Ayrshire Council will explore options for funding for some of the
preferred options identified from the appraisal process. The delivery of this
action is subject to funding being made available. 
Community engagement (2703)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Detailed design for the surface water management measures should be
carried out in conjunction with community engagement where issues,
constraints, aspirations and opportunities are identified. A community
engagement plan should be created to cover the time period from detailed
design to implementation of the preferred flood risk management option.
Delivery Lead South Ayrshire Council
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the preferred flood risk management options.
DRAFT
Appendix 2

Page 356

125 
Sewer flood risk assessment (2704)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Flood study (existing flood defences) (2705)
Action The performance and condition of the existing flood defences are to be
evaluated, including consideration of the likely impacts of climate change.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Description A study of the existing coastal flood defences (Prestwick Sea Walls) to be
carried out. The study should establish the current and predicted standard
of protection for a number of climate change scenarios. This information
will underpin the development of an adaptation plan for the long term
protection of the community.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA. SEPA will work with the local authority
on the potential to coordinate this action with an update to SFDAD, work on
coastal flood mapping and flood warning actions.
Local Detail Detailed survey and flood modelling will be carried out for the Prestwick
Coastal Flood Study. The outcomes of the study will underpin the
development of an adaption plan for the long term protection of the
community.
DRAFT
Appendix 2

Page 357

126 
Flood defence maintenance (2706)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description South Ayrshire Council is to continue to inspect and maintain the Prestwick
coastal defences (Prestwick Sea Walls). The maintenance regime should
be made based on the findings of the flood study.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding Maintenance works as required will be funded through South Ayrshire
Council's budget provided by Scottish Government.
Coordination South Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail South Ayrshire Council shall continue to inspect and maintain the Prestwick
coastal defences. The maintenance regime should be made based on the
findings of the annual inspection programme and proposed coastal flood
study. 
Flood warning maintenance (2707)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 358

Summary Location map
Flood risk management plan datasheet 
Ayr (target area 71) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
surface water management plan, sewer flood risk assessment and integrated catchment study, which also
assesses the interactions between the different flood sources. Understanding is improved for coastal flooding by
the shoreline management plan and river flooding by the flood warning scheme. There is a long record of
flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. The following package of objectives have been
established for this area. The objectives must be considered alongside national principles to manage flood risk.
These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources.
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Ayr covers the north-west area of Ayr on the coast at
the mouth of the River Ayr. The area is located within
the South Ayrshire Council area. The main sources of
flooding in north-west area of Ayr are from river and
surface water flooding, however there is also a risk
from coastal flooding. There are approximately 3,000
people and 1,700 homes and businesses at risk from
flooding. This is likely to increase to 4,600 people and
2,600 homes and businesses by the 2080s due to
climate change.
DRAFT
Appendix 2

Page 359

128 
Objective ref Objective type Objective Description
711 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Ayr South coastal
defences
712 Avoid flood risk Avoid inappropriate development that increases flood risk
in Ayr
713 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Ayr
714 Reduce flood risk Reduce the risk of flooding in Ayr 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (7101)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
Delivery Lead South Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council and Scottish Water.
Local Detail South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
DRAFT
Appendix 2

Page 360

129 
Community engagement (7102)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Detailed design for the surface water management measures should be
carried out in conjunction with community engagement where issues,
constraints, aspirations and opportunities are identified. A community
engagement plan should be created to cover the time period from detailed
design to implementation of the preferred flood risk management options.
Delivery Lead South Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the preferred flood risk management options. 
Sewer flood risk assessment (7103)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009.
DRAFT
Appendix 2

Page 361

130 
Flood defence maintenance (7104)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description South Ayrshire Council is to continue to inspect and maintain the Ayr South
coastal defences. The maintenance regime should be made based on the
findings of the flood study.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding Maintenance works as required will be funded through South Ayrshire
Council's budget provided by Scottish Government.
Coordination South Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail South Ayrshire Council shall continue to inspect and maintain the Ayr
South coastal defences (Ayr Sea Walls) The maintenance regime should
be made based on the findings of the annual inspection programme and
proposed coastal flood study. 
Flood warning maintenance (7105)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 362

131 
Strategic mapping improvements (7106)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A.
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Flood study (7107)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to address flood risk in Ayr. The
Shoreline Management Plan, the surface water management plan, the
Meadowhead Integrated Catchment Study, and operation of the existing
defences and flood warning should be reviewed to ascertain the
requirements of the flood study. The impacts of climate change on flood
risk should be evaluated. The interactivity between surface water, river and
coastal flooding should be assessed. If flood risk is confirmed, scoping of
the next steps should be completed.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2028 - 2034).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and Scottish Water.
Local Detail Flood modelling will be carried out for the Ayr Flood Study. Where flood
risk is confirmed, scoping of the next steps will be completed.
DRAFT
Appendix 2

Page 363

132 
Flood study (existing flood defences) (7108)
Action The performance and condition of the existing flood defences are to be
evaluated, including consideration of the likely impacts of climate change.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Description A study of Ayr South existing coastal defences should be carried out
following the outcomes of the flood study. The study should establish the
predicted standard of protection for a number of climate change scenarios.
This information will underpin the development of an adaptation plan for the
long term protection of the community.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA.
Local Detail Detailed survey and flood modelling will be carried out for the Ayr Coastal
Flood Study. The outcomes of the study will underpin the development of
an adaption plan for the long term protection of the community. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk information is
developed and updated for all areas. A description of these actions is included in the Local Plan District section at
the start of this document.
DRAFT
Appendix 2

Page 364

133 
02/12/09 (River Ayr catchment) 
This area is designated as a potentially vulnerable area due to flood risk to Ayr. The main
sources of flooding are from surface water and the River Ayr. Flooding has been recorded
in the area, with recent flooding being caused by river flooding. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Ayr east (target area 72) 
DRAFT
Appendix 2

Page 365

134 
Summary Location map
Flood risk management plan datasheet 
Ayr east (target area 72) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment and integrated catchment study, which also assesses the interactions between the
different flood sources. Understanding is improved for river flooding by the flood warning scheme. There is a
long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Ayr east covers a section of the eastern area of the
town of Ayr, which is located at the banks of the River
Ayr. The area is located within the South Ayrshire
Council area. The main source of flooding in Ayr East
is surface water flooding, there is also a risk of river
flooding. There are approximately 500 people and 250
homes and businesses at risk from flooding. This is
likely to increase to 560 people and 290 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 366

135 
Objective ref Objective type Objective Description
721 Avoid flood risk Avoid inappropriate development that increases flood risk
in Ayr
722 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Ayr
723 Reduce flood risk Reduce the risk of flooding in Ayr 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (7201)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
In accordance with the flood risk management plan, as part of the scheme
or works, the responsible authority should aim to ensure the action will not
have an adverse effect on the integrity of the Airds Moss Special Area of
Conservation and Muirkirk and the North Lowther Uplands Special
Protection Area.
Delivery Lead South Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council and Scottish Water.
Local Detail South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
HRA Mitigation
Statement
To be in accord with the FRM Plan, the responsible authority should seek
to ensure as part of the scheme/works that the action will not have an
adverse effect on the integrity of the Airds Moss Special Area of
Conservation and Muirkirk and North Lowther Uplands Special
Protection Area.
DRAFT
Appendix 2

Page 367

136 
Community engagement (7202)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Detailed design for the surface water management measures should be
carried out in conjunction with community engagement where issues,
constraints, aspirations and opportunities are identified. A community
engagement plan should be created to cover the time period from detailed
design to implementation of the preferred flood risk management option.
Delivery Lead South Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the preferred flood risk management options. 
Sewer flood risk assessment (7203)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 368

137 
Flood study (7204)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to address flood risk in Ayr. The surface
water management plan, the Meadowhead Integrated Catchment Study,
and flood forecasting model should be reviewed to ascertain the
requirements of the flood study. The impacts of climate change on flood
risk should be evaluated. The interactivity between surface water and river
flooding should be assessed. If flood risk is confirmed, scoping of the next
steps should be completed.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2028 - 2034).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and Scottish Water.
Local Detail Flood modelling will be carried out for the Ayr East Flood Study. Where
flood risk is confirmed, scoping of the next steps will be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 369

138 
02/12/10 (Ayr south) 
This area is designated as a potentially vulnerable area due to flood risk to Ayr. The main
sources of flooding are surface water and river flooding from the River Doon. Flooding has
been recorded in the area with recent flooding being caused by surface water flooding. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Ayr Doon (target area 74) 
DRAFT
Appendix 2

Page 370

139 
Summary Location map
Flood risk management plan datasheet 
Ayr Doon (target area 74) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment and integrated catchment study, which also assesses the interactions between the
different flood sources. There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Ayr Doon covers an area in the south-west of the town
of Ayr, which is located at the banks of the River
Doon. The area is located within the South Ayrshire
Council area. The source of flooding in Ayr Doon area
is river and surface water flooding. There are
approximately 200 people and 120 homes and
businesses at risk from flooding. This is estimated to
increase to 210 people and 130 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 371

140 
Objective ref Objective type Objective Description
741 Avoid flood risk Avoid inappropriate development that increases flood risk
in Ayr
742 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Ayr
743 Reduce flood risk Reduce the risk of flooding in Ayr 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (7401)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
In accordance with the flood risk management plan, as part of the scheme
or works, the responsible authority should aim to ensure the action will not
have an adverse effect on the integrity of the Merrick Kells Special Area of
Conservation.
Delivery Lead South Ayrshire Council.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, Scottish Water and SEPA.
Local Detail South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
HRA Mitigation
Statement
To be in accord with the FRM Plan, the responsible authority should seek
to ensure as part of the scheme/works that the action will not have an
adverse effect on the integrity of the Merrick Kells Special Area of
Conservation.
DRAFT
Appendix 2

Page 372

141 
Community engagement (7402)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Detailed design for the surface water management measures should be
carried out in conjunction with community engagement where issues,
constraints, aspirations and opportunities are identified. A community
engagement plan should be created to cover the time period from detailed
design to implementation of the preferred flood risk management option.
Delivery Lead South Ayrshire Council
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the preferred flood risk management options. 
Flood study (options appraisal) (7403)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed.
Description Following the outcomes of the Doon Valley Flood Study, options should be
developed for river flood risk mitigation management. Current and long
term flood risk should be considered and how this area will adapt to
changes in flood risk through an adaptation plan.
Delivery Lead Action delivery lead is South Ayrshire Council. Once the actions have been
finalised, they will be progressed in coordination with East Ayrshire
Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through South Ayrshire Council and East
Ayrshire Councils' budgets provided by Scottish Government, subject to
any future funding review.
Coordination South Ayrshire Council will deliver this flood study with information
provided by other relevant responsible authorities, which may include
Scottish Water and SEPA.
Local Detail The flood modelling being carried out for the River Doon Flood Study will
be reviewed. Where flood risk is confirmed, scoping of the next steps will
be completed.
DRAFT
Appendix 2

Page 373

142 
Sewer flood risk assessment (7404)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 374

143 
02/12/11 (Ayr east) 
This area is designated as a potentially vulnerable area due to flood risk to Ayr. There is
river, coastal and surface water flood risk, with the main source of flooding from the
Annfield Burn and Slaphouse Burn. There have been recent reports of flooding in the area,
with recent flooding being caused by river flooding. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Ayr south east (target area 73) 
DRAFT
Appendix 2

Page 375

multiple outcomes. 
Summary Location map
Flood risk management plan datasheet 
Ayr south east (target area 73) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment and integrated catchment study, which also assesses the interactions between the
different flood sources. Understanding is improved for coastal flooding by the shoreline management plan.
There are periodic records of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources.
• Consider whole catchments and coastlines and work w1it4h4 natural processes and the environment to deliver
©Crown copyright. All rights reserved. NAC lic no. 100023393
Ayr south east covers an area in the south east of the
town of Ayr and is located on the banks of Slaphouse
Burn. The area is located within the South Ayrshire
Council area. The main source of flooding in the Ayr
East area is river flooding, however there are also
risks of coastal and surface water flooding. There are
approximately 820 people and 430 homes and
businesses currently at risk from flooding. This is likely
to increase to 880 people and 460 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 376

145 
Objective ref Objective type Objective Description
731 Avoid flood risk Avoid inappropriate development that increases flood risk
in Ayr
732 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Ayr
733 Reduce flood risk Reduce the risk of flooding in Ayr 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (7301)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
Delivery Lead South Ayrshire Council
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council and Scottish Water.
Local Detail South Ayrshire Council to develop a detailed design for surface water
management, based on the preferred option from the appraisal process.
DRAFT
Appendix 2

Page 377

146 
Community engagement (7302)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Detailed design for the surface water management measures should be
carried out in conjunction with community engagement where issues,
constraints, aspirations and opportunities are identified. A community
engagement plan should be created to cover the time period from detailed
design to implementation of the preferred flood risk management option.
Delivery Lead South Ayrshire Council
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council, SEPA and Scottish Water will continue to engage
with responsible authorities and all other stakeholders, including
community groups and the public.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the preferred flood risk management options. 
Flood study (7303)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to address flood risk from the
Slaphouse Burn. The impacts of climate change on flood risk should be
evaluated. The interactivity between surface water, river and coastal
flooding should be assessed. If flood risk is confirmed, scoping of the next
steps should be completed.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and Scottish Water.
Local Detail Flood modelling will be carried out for the Slaphouse Burn Flood Study.
Where flood risk is confirmed, scoping of the next steps will be completed.
DRAFT
Appendix 2

Page 378

147 
Sewer flood risk assessment (7304)
Action The volume of water that would overwhelm the sewer system and cause
flooding from man-holes or inside our homes is to be assessed, to support
understanding of the performance of the urban drainage network.
Description Scottish Water will carry out an assessment of sewer flood risk within the
highest priority sewer catchments, which includes Meadowhead sewer
catchment in this target area. This will help to improve knowledge and
understanding of potential surface water flood risk. Funding for this action
is secured through Scottish Water's strategic planning commitments.
Delivery Lead Scottish Water.
Indicative Delivery 2023-2025.
Funding Funding for this action is secured within Scottish Water's business plan.
Coordination Ouputs of this modelling assessment will be shared with local authorities
and SEPA.
Local Detail Scottish Water will undertake a modelling assessment in the Meadowhead
sewer catchment to improve knowledge and understanding of flood risk in
this area as required under Section 16 of the Flood Risk Management
(Scotland) Act 2009. 
Flood warning maintenance (7305)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will maintain the Firth of Clyde coastal flood warning scheme. SEPA
will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 379

148 
Strategic mapping improvements (7306)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 380

149 
02/12/12 (Dalrymple to Dalmellington) 
This area is designated as a potentially vulnerable area due to flood risk to Dalrymple,
Dalmellington and Patna. The main source of flooding is from the River Doon and the Muck
Water, with some risk from surface water flooding. Recent flooding has been recorded in
the area. 
There are 3 target areas in this potentially vulnerable area, which have been the focus of
further assessment, these are listed below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Dalrymple (target area 77)
Dalmellington (target area 96)
Patna (target area 164) 
DRAFT
Appendix 2

Page 381

150 
Summary Location map
Flood risk management plan datasheet 
Dalrymple (target area 77) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The village of Dalrymple lies in the Doon Valley, on
the north bank of the River Doon. The area is located
within the East Ayrshire Council area. The main
source of flooding in Dalrymple is river flooding. There
are approximately 410 people and 200 homes and
businesses at risk from flooding. This is estimated to
increase to 460 people and 230 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 382

151 
Objective ref Objective type Objective Description
771 Avoid flood risk Avoid inappropriate development that increases flood risk
in Dalrymple
772 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Primpton Burn flood
protection asset
773 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Dalrymple
774 Reduce flood risk Reduce the risk of flooding in Dalrymple 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood study (options appraisal) (7701)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed. The performance and condition
of the existing flood defences is to be evaluated, including consideration of
the likely impacts of climate change. This should guide adaptive planning to
allow for the impacts of climate change to be monitored, understood and
managed.
Description Following the completion of Doon Valley Flood Study, possible options to
manage flood risk should be developed. This should include a review of the
predicted standard of protection of the Primpton Burn flood protection asset
for a number of climate change scenarios. This information will support a
climate change adaptive plan for this flood protection asset.
Delivery Lead Action delivery lead is East Ayrshire Council. Once the actions have been
finalised, they will be progressed in coordination with South Ayrshire
Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council and South
Ayrshire Councils' budgets provided by Scottish Government, subject to
any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail The flood modelling being carried out for the River Doon Flood Study will
be reviewed. Where flood risk is confirmed, scoping of the next steps will
be completed.
DRAFT
Appendix 2

Page 383

152 
Flood defence maintenance (7702)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description East Ayrshire Council is to continue to inspect and maintain the Primpton
Burn flood protection asset. The maintenance regime should be informed
by the outcomes of the flood study.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail The flood modelling being carried out for the River Doon Flood Study will
be reviewed. Where flood risk is confirmed, scoping of the next steps will
be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 384

153 
Summary Location map
Flood risk management plan datasheet 
Dalmellington (target area 96) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources and this information has highlighted the risk of flooding in this area. There is
a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The market town of Dalmellington is located on the
banks of Muck Water. The area is located within the
East Ayrshire Council area. The main source of
flooding in Dalmellington is river flooding, however
there is also a risk from surface water flooding. There
are approximately 130 people and 100 homes and
businesses currently at risk from flooding. This is likely
to increase to 180 people and 140 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 385

154 
Objective ref Objective type Objective Description
961 Avoid flood risk Avoid inappropriate development that increases flood risk
in Dalmellington
962 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Dalmellington
963 Reduce flood risk Reduce the risk of flooding in Dalmellington 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood study (options appraisal) (9601)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed.
Description Following the completion of Doon Valley Flood Study, possible options to
manage flood risk should be developed. If risk is confirmed, the feasibility
of a range of flood risk management options should be carried out.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail The flood modelling being carried out for the River Doon Flood Study will
be reviewed. Where flood risk is confirmed, scoping of the next steps will
be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document. DRAFT
Appendix 2

Page 386

155 
Summary Location map
Flood risk management plan datasheet 
Patna (target area 164) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources and this information has highlighted the risk of flooding in this area. Patna
has therefore been identified as a new target area for the 2021 flood risk management plans. There are limited
records of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Patna is a village in East Ayrshire Council area
located on the banks of the River Doon. The main
source of flooding in Patna is river flooding, however
there is also risk of surface water flooding. There are
approximately 10 people and 7 homes and businesses
currently at risk from flooding. This is likely to increase
to 60 people and 30 homes and businesses by the
2080s due to climate change.
DRAFT
Appendix 2

Page 387

156 
Objective ref Objective type Objective Description
1641 Avoid flood risk Avoid inappropriate development that increases flood risk
in Patna
1642 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Patna
1643 Reduce flood risk Reduce the risk of flooding in Patna 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Flood study (options appraisal) (16401)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed.
Description Following the completion of Doon Valley Flood Study, possible options to
manage flood risk should be developed. If risk is confirmed, the feasibility
of a range of flood risk management options should be carried out.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail The flood modelling being carried out for the River Doon Flood Study will
be reviewed. Where flood risk is confirmed, scoping of the next steps will
be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 388

157 
02/12/13 (Drongan) 
This area is designated as a potentially vulnerable area due to the potential flood risk to
Drongan. The main source of risk is from the Water of Coyle, with some risk from surface
water flooding. There has been no recorded flooding in this area. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Drongan (target area 18) 
DRAFT
Appendix 2

Page 389

158 
Summary Location map
Flood risk management plan datasheet 
Drongan (target area 18) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the risk of flooding in this area. Drongan
has therefore been identified as a new target area for the 2021 flood risk management plans. There are no
records of flooding in the Drongan area but this does not confirm that there is no flood risk. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The village of Drongan is located approximately 10km
east of Ayr. The area is located within the East
Ayrshire Council area. The main source of flooding in
Drongan is river flooding, however there is also a
small risk from surface water flooding. There are
approximately 150 people and 70 homes and
businesses at risk from flooding. This is estimated to
increase to 210 people and 100 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 390

159 
Objective ref Objective type Objective Description
181 Avoid flood risk Avoid inappropriate development that increases flood risk
in Drongan
182 Improve data and
understanding
Improve data and understanding of climate change related
to flooding in Drongan 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. The local flood risk management plan published in 2022 provides more information on
the actions, their timing and how they will be funded and coordinated. 
Actions proposed to start between 2022 and 2028 
Data collection (1801)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description Data collection and monitoring will continue using the river monitors on the
Taiglum Burn to improve the confidence in flood sources, mechanisms and
risk. A review will be required to assess the need for rain and/or river
gauges. Post flood surveys will be required to collect data on flooding
mechanisms, risk and damage caused.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council.
SEPA will work with the local authority on the potential to coordinate
opportunities for joint data collection activities.
Local Detail A review will be required to assess the need for rain and/or river gauges.
Post flood surveys will be required to collect data on flooding mechanisms,
risk and damage caused.
DRAFT
Appendix 2

Page 391

160 
Flood study (1802)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description Following the completion of River Ayr Flood Study, if future flood risk is
confirmed in this target area, scoping of the next steps should be
completed.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail The flood modelling being carried out for the River Ayr Valley Flood Study
will be reviewed. Where flood risk is confirmed, scoping of the next steps
will be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk information is
developed and updated for all areas. A description of these actions is included in the Local Plan District section at
the start of this document
DRAFT
Appendix 2

Page 392

161 
02/12/14 (Straiton) 
This area is designated as a potentially vulnerable area due to flood risk to Straiton. The
main source of risk is from the Water of Girvan, with some risk from surface water. There is
a history of flooding in the area, with recent flooding being caused by flooding from the
Water of Girvan. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Straiton (target area 162) 
DRAFT
Appendix 2

Page 393

162 
Summary Location map
Flood risk management plan datasheet 
Straiton (target area 162) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the risk of flooding in this area. Straiton
has therefore been identified as a new target area for the 2021 flood risk management plans. There are periodic
records of flooding in the Straiton area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Straiton is located along the banks of the Water of
Girvan. The area is located within the South Ayrshire
Council area. The main source of flooding in Straiton
is from river flooding. There are approximately 60
people and 30 homes and businesses currently at risk
of flooding. These are expected to remain the same in 
the 2080s with regards to climate change.
DRAFT
Appendix 2

Page 394

163 
Objective ref Objective type Objective Description
1621 Avoid flood risk Avoid inappropriate development that increases flood risk
in Straiton
1622 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Straiton
1623 Improve data and
understanding
Improve data and understanding of flooding in Straiton 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Data collection (16201)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description This may include data collection and monitoring to improve the confidence
in flood sources, mechanisms and risk. A review may be required to assess
the need for rain and/or river gauges. Post flood surveys may be required
to collect data on flooding mechanisms, risk and damage caused.
Delivery Lead Action delivery lead is South Ayrshire Council and coordination will be
determined once the actions have been finalised.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA will work together on the potential to
coordinate opportunities for joint data collection activities.
Local Detail Gauges shall be installed in the Kirk Burn & the Water of Girvan to monitor
flow and depth information to inform a future study to commence in Cycle
3. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 395

164 
Flood study (16202)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to improve understanding of river flood
risk in Straiton. The impacts of climate change on flood risk should be
evaluated. If flood risk is confirmed, scoping of the next steps should be
completed.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council will deliver this flood study with information
provided by other relevant responsible authorities, which may include
Scottish Water and SEPA.
Local Detail Flood modelling will be carried out for the Dyrock Burn and Water of
Girvan Flood Study, informed by data gathering in Cycle 2. Where flood
risk is confirmed, scoping of the next steps will be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 396

165 
02/12/15 (Cumnock) 
This area is designated as a potentially vulnerable area due to flood risk to Auchinleck and
Cumnock. The main sources of flooding are from surface water and river flooding from the
Lugar Water. There are regular reports of flooding from the Gaisnock Water in Cumnock.
There is a history of flooding in the area, with recent flooding being caused by surface
water. 
There are 2 target area in this potentially vulnerable area, which has been the focus of
further assessment, this is identified below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Cumnock (target area 19)
Auchinleck (target area 68) 
DRAFT
Appendix 2

Page 397

166 
Summary Location map
Flood risk management plan datasheet 
Cumnock (target area 19) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water. The national level assessment is improved for surface water flooding by the sewer flood risk
assessment and improved for river flooding by the ongoing River Ayr Flood Study. Together, this information
has highlighted the risk of flooding in this area. Cumnock has therefore been identified as a new target area for
the 2021 flood risk management plans. There is a long record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The town of Cumnock and the villages of Netherthird,
Craigens and Logan are located adjacent to the Lugar
and Glaisnock Water. These areas are located within
the East Ayrshire Council area. The main source of
flooding in Cumnock is surface water flooding,
however there is also a risk from river flooding. There
are approximately 550 people and 400 homes and
businesses at risk from flooding. This is estimated to
increase to 720 people and 500 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 398

167 
Objective ref Objective type Objective Description
191 Avoid flood risk Avoid inappropriate development that increases flood risk
in this target area
192 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in this target area
193 Reduce flood risk Reduce the risk of flooding in this target area 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. The local flood risk management plan published in 2022 provides more information on
the actions, their timing and how they will be funded and coordinated.
Actions proposed to start between 2022 and 2028 
Flood study (options appraisal) (1901)
Action In areas where flood risk is confirmed, a range of possible options to
manage flood risk are to be identified, including natural flood management
actions where suitable, and a preferred approach is to be chosen. This
should include adaptive planning to allow for the impacts of climate change
to be monitored, understood and managed.
Description Following the completion of River Ayr Flood Study, possible options to
manage flood risk should be developed. If risk is confirmed, the feasibility
of a range of flood risk management options should be carried out.
Delivery Lead East Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail The flood modelling being carried out for the River Ayr Flood Study will be
reviewed. Where flood risk is confirmed, scoping of the next steps will be
completed. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 399

168 
Property flood resilience scheme (1902)
Action The proposed scheme to provide resilience measures against flooding for
individual buildings is to be taken forward to help prevent water entering
the property and to minimise flood damage.
Description The River Ayr Flood Study should be completed as planned. Following the
completion of the flood modelling, East Ayrshire Council should review the
property resilience program.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action will be funded through East Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council in coordination with identified stakeholders.
Local Detail Following the outcomes of the flood study for the River Ayr, East Ayrshire
Council shall review the benefit of the property resilience program. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 400

169 
Summary Location map
Flood risk management plan datasheet 
Auchinleck (target area 68) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and this information has highlighted the risk of flooding in this area.
Auchinleck has therefore been identified as a new target area for the 2021 flood risk management plans. There
are no records of flooding in this target area but this does not confirm that there is no flood risk. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The village of Auchinleck is located within the East
Ayrshire Council area. The main source of flooding in
Auchinleck is surface water flooding. There are
approximately 50 people and 40 homes and
businesses at risk from flooding. This is likely to
increase to 100 people and 60 homes and businesses
by the 2080s due to climate change.
DRAFT
Appendix 2

Page 401

. 
Objective ref Objective type Objective Description
681 Avoid flood risk Avoid inappropriate development that increases flood risk
in Auchinleck
682 Improve data and
understanding
Improve data and understanding of flooding in Auchinleck
683 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Auchinleck 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. The local flood risk management plan published in 2022 provides more information on
the actions, their timing and how they will be funded and coordinated.
Actions proposed to start between 2022 and 2028 
Flood risk management review (6801)
Action During each 6 year planning cycle, we update our understanding of
flooding to include all new data and information that has become available.
This includes information on any flooding that has happened and the latest
predictions on the impacts of climate change. The updated understanding
is used to set any appropriate objectives and actions for areas at risk of
flooding.
Description No local actions specific to this target area have been identified yet. There
are national actions planned that will cover this area, including an update to
SEPA's surface water flood maps and an update to the national flood risk
assessment. These, along with other actions that are carried out across the
whole local plan district covering this area, will help to manage flood risk in
the long term. The need for actions for this area will be reviewed again in
2026.
Delivery Lead SEPA.
Indicative Delivery 2022-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the other responsible authorities to review flood risk
management for this area, through the Local Plan District Partnerships. A
public consultation on priority areas will be held in 2024 by SEPA, which
will be open for three months. A public consultation on future flood
management actions will be held in December 2026 and will be open for at
least three months.
Local Detail No local actions specific to this target area have been identified yet.
However, there are national actions to be taken forward which will help
identify future needs in this area. SEPA are updating surface water
mapping to enhance the understanding of current and future surface water
flood risks. Scotland’s most vulnerable areas will be reviewed to take
account of any new information, which will be published in 2024. Long term
flood management actions will be reviewed in 2026. SEPA will continue to
collect information on any flooding that occurs in the area, to inform the
review process. 
Actions proposed after June 2028 
DRAFT
Appendix 2

Page 402

171 
Surface water management plan (6802)
Action Areas at risk of heavy or prolonged rainfall causing flooding due to water
ponding on man-made surfaces or overwhelming the drainage system are
to be identified. These priority areas will provide a baseline for the
identification of next steps in managing water ponding or over-whelmed
drainage systems. This should guide adaptive planning to allow for the
impacts of climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead East Ayrshire Council / Scottish Water
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding The surface water flood risk options appraisal will be funded through East
Ayrshire Council's budget provided by Scottish Government or funded by
Scottish Water's budget as appropriate.
Coordination East Ayrshire Council, Scottish Water and SEPA.
Local Detail Further details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 403

172 
02/12/16 (Catrine) 
This area is designated as a potentially vulnerable area due to flood risk to Catrine and
Sorn. The main source of flooding is from the River Ayr, with some risk from surface water.
There is a history of river flooding in the area. 
There are 2 target area in this potentially vulnerable area, which has been the focus of
further assessment, this is identified below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Sorn (target area 16)
Catrine (target area 17) 
DRAFT
Appendix 2

Page 404

173 
Summary Location map
Flood risk management plan datasheet 
Sorn (target area 16) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the new
flood warning scheme. There are no records of flooding in the Sorn area but this does not confirm that there is
no flood risk. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The small village of Sorn is located on the banks of
the River Ayr. The area is located within the East
Ayrshire Council area. The main source of flooding in
Sorn is river flooding, however there is also a risk from
surface water flooding. There are approximately 180
people at risk from flooding and approximately 110
homes and businesses, which is a significant
proportion of the community. These figures are
expected to remain the same by the 2080s,
irrespective of climate change.
DRAFT
Appendix 2

Page 405

174 
Objective ref Objective type Objective Description
161 Avoid flood risk Avoid inappropriate development that increases flood risk
in Sorn
162 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Sorn
163 Reduce flood risk Reduce the risk of flooding in Sorn 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
Actions proposed to start between 2022 and 2028 
Flood study (options appraisal) (1601)
Action In areas where flood risk is confirmed, a range of possible options to manage
flood risk are to be identified, including natural flood management actions
where suitable, and a preferred approach is to be chosen. This should include
adaptive planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description Following the completion of River Ayr Flood Study, possible options to
manage flood risk should be developed. If risk is confirmed, the feasibility of a
range of flood risk management options should be carried out.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council's budget provided by
Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council will deliver this flood study with information provided by
other relevant responsible authorities, which may include Scottish Water and
SEPA.
Local Detail If risk is confirmed, the feasibility of a range of flood risk management options
should be carried out. 
Flood warning maintenance (1602)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Ayr, Annick and Irvine flood warning schemes.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through SEPA’s
grant in aid settlement.
Coordination SEPA will maintain the Ayr, Annick and Irvine flood warning schemes. SEPA
will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 406

175 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 407

176 
Summary Location map
Flood risk management plan datasheet 
Catrine (target area 17) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the new
flood warning scheme and surface water flooding by the sewer flood risk assessment. There are limited records
of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The village of Catrine is located on the banks of the
River Ayr, within the East Ayrshire Council area. The
main source of flooding in Catrine is river flooding,
however there is also a risk from surface water
flooding. There are approximately 530 people and 320
homes and businesses at risk from flooding. This is
estimated to increase to 550 people and 330 homes
and businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 408

177 
Objective ref Objective type Objective Description
171 Avoid flood risk Avoid inappropriate development that increases flood risk
in Catrine
172 Improve data and
understanding
Improve data and understanding of flooding in Catrine
173 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Catrine 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. The local flood risk management plan published in 2022 provides more information on
the actions, their timing and how they will be funded and coordinated. 
Actions proposed to start between 2022 and 2028 
Data collection (1701)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description Data collection and monitoring will continue using the river monitors on the
River Ayr to improve the confidence in flood sources, mechanisms and risk.
A review will be required to assess the need for rain and/or river gauges.
Post flood surveys will be required to collect data on flooding mechanisms,
risk and damage caused.
Delivery Lead East Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council and South
Ayrshire Councils' budgets provided by Scottish Government, subject to
any future funding review.
Coordination East Ayrshire Council and SEPA will work together on the potential to
coordinate opportunities for joint data collection activities.
Local Detail East Ayrshire Council shall continue to liaise with SEPA and utilise SEPA
gauge information available for this catchment, as required.
DRAFT
Appendix 2

Page 409

178 
Flood study (1702)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description The flood modelling being carried out for the River Ayr Flood Study should
be reviewed along with the SEPA model for the flood warning scheme and
the Scottish Water sewer flood risk assessment. If flood risk is confirmed,
scoping of the next steps should be completed.
Delivery Lead Action delivery lead is East Ayrshire Council. Once the actions have been
finalised, they will be progressed in coordination with South Ayrshire
Council.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This action will be funded through East Ayrshire Council budgets provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council and South Ayrshire Council.
Local Detail The flood modelling being carried out for the River Ayr Flood Study will be
reviewed. Where flood risk is confirmed, scoping of the next steps will be
completed. 
Flood warning maintenance (1703)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Ayr, Annick and Irvine flood warning schemes.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will maintain the Ayr, Annick and Irvine flood warning schemes.
SEPA will continue to raise awareness of flood warning, and engage with
communities about the service when required.
Local Detail N/A. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 410

179 
Property flood resilience scheme (1704)
Action The proposed scheme to provide resilience measures against flooding for
individual buildings is to be taken forward to help prevent water entering
the property and to minimise flood damage.
Description Based on the outcomes of the flood study for Catrine, East Ayrshire
Council is to review the benefit of the property resilience program.
Delivery Lead East Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action will be funded through East Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination East Ayrshire Council with other identified stakeholders.
Local Detail The outcomes of the flood study for the River Ayr, East Ayrshire Council
shall review the benefit of the property resilience program. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 411

180 
02/12/17 (Girvan) 
This area is designated as a potentially vulnerable area due to flood risk to Girvan. There is
flooding from river, coastal and surface water. Recent river and surface water flooding has
occurred in this area. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Girvan (target area 78) 
DRAFT
Appendix 2

Page 412

multiple outcomes. 
Summary Location map
Flood risk management plan datasheet 
Girvan (target area 78) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for surface water flooding by the
sewer flood risk assessment and for both river and surface water flooding by the Girvan flood study.
Understanding is improved for coastal flooding by the shoreline management plan. There is a long record of
flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources.
• Consider whole catchments and coastlines and work w1it8h1 natural processes and the environment to deliver
©Crown copyright. All rights reserved. NAC lic no. 100023393
Girvan is a coastal town located at the mouth of the
Water of Girvan. The area is located within the South
Ayrshire Council area. The main source of flooding in
Girvan is river flooding, however there is also risk of
coastal and surface water flooding. There are
approximately 460 people and 270 homes and
businesses at risk from flooding. This is likely to
increase to 580 people and 340 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 413

182 
Objective ref Objective type Objective Description
781 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of Girvan coastal defences
782 Avoid flood risk Avoid inappropriate development that increases flood risk
in Girvan
783 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Girvan
784 Reduce flood risk Reduce the risk of flooding in Girvan 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (7801)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description South Ayrshire Council to develop detailed design of the Girvan Flood
Protection Scheme, based on the preferred option from the flood study and
public engagement.
The responsible authority proposes this action as the best viable option for
managing flood risk in this community. The delivery of this action is subject
to capital funding being made available.
Delivery Lead Action delivery lead is South Ayrshire Council in coordination with SEPA.
Indicative Delivery Cycle 2 (2022 - 2028). The delivery of this action is subject to Scottish
Government capital grant funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination South Ayrshire Council and SEPA will work together on the potential to
coordinate this action with work on coastal flood mapping and flood
warning actions.
Local Detail Subject to Scottish Government funding being available, South Ayrshire
Council to develop detailed design for Girvan Flood Protection Scheme
based on the preferred option from the flood study.
DRAFT
Appendix 2

Page 414

183 
Flood defence maintenance (7802)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description South Ayrshire Council is to continue to inspect and maintain the Girvan
coastal defences. The maintenance regime should be made based on the
findings of the flood study.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding Maintenance works as required will be funded through South Ayrshire
Council's budget provided by Scottish Government.
Coordination South Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail South Ayrshire Council shall continue to inspect and maintain the Girvan
coastal defences. The maintenance regime should be made based on the
findings of the annual inspection programme and proposed coastal flood
study. 
Flood warning maintenance (7803)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 415

184 
Strategic mapping improvements (7804)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Flood study (7805)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk. The performance and
condition of the existing flood defences is to be evaluated, including
consideration of the likely impacts of climate change. This should guide
adaptive planning to allow for the impacts of climate change to be
monitored, understood and managed.
Description A flood study should be carried out to improve understanding of coastal
flood risk in Girvan. The Shoreline Management Plan and operation of the
existing defences should be reviewed to ascertain the requirements of the
flood study. The impacts of climate change on flood risk should be
evaluated. The interactivity between coastal flooding and other sources of
flooding should be assessed. If flood risk is confirmed, scoping of the next
steps should be completed.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail Flood modelling will be carried out for Girvan Coastal Flood Study. Where
flood risk is confirmed, scoping of the next steps will be completed.
DRAFT
Appendix 2

Page 416

185 
Flood study (existing flood defences) (7806)
Action The performance and condition of the existing flood defences are to be
evaluated, including consideration of the likely impacts of climate change.
This should guide adaptive planning to allow for the impacts of climate
change to be monitored, understood and managed.
Description A study of the existing coastal flood defences to be carried out following the
outcomes of the coastal flood study. The study should establish the
predicted standard of protection for a number of climate change scenarios.
This information will underpin the development of an adaptation plan for the
long term protection of the community.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA.
Local Detail Detailed survey and flood modelling will be carried out for the Girvan
Coastal Flood Study. The outcomes of the study will underpin the
development of an adaption plan for the long term protection of the
community. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk information is
developed and updated for all areas. A description of these actions is included in the Local Plan District section at
the start of this document
DRAFT
Appendix 2

Page 417

186 
02/12/18 (Barrhill) 
This area is designated as a potentially vulnerable area due to flood risk to Barrhill. The
main source of flooding is from the Cross Water, and some surface water. There are no
historical records of flooding in the area. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Barrhill (target area 95) 
DRAFT
Appendix 2

Page 418

187 
Summary Location map
Flood risk management plan datasheet 
Barrhill (target area 95) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the risk of flooding in this area. Barrhill
has therefore been identified as a new target area for the 2021 flood risk management plans. There are no
records of flooding in the Barrhill area but this does not confirm that there is no flood risk. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Barrhill is a small village located west of Galloway
Forest Park. The area is located within the South
Ayrshire Council area. The main sources of flooding in
Barrhill are from river and surface water flooding.
There are approximately 70 people and 40 homes and
businesses currently at risk from flooding, which is a
significant proportion of the community. This is likely
to increase to 80 people and 50 homes and
businesses by the 2080s due to climate change.
DRAFT
Appendix 2

Page 419

188 
Objective ref Objective type Objective Description
951 Avoid flood risk Avoid inappropriate development that increases flood risk
in Barrhill
952 Improve data and
understanding
Improve data and understanding of surface water and river
flooding in Barrhill 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Data collection (9501)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description This may include data collection and monitoring to improve the confidence
in flood sources, mechanisms and risk. A review may be required to assess
the need for rain and/or river gauges. Post flood surveys may be required
to collect data on flooding mechanisms, risk and damage caused. Data
collected can be used to inform future studies.
Delivery Lead South Ayrshire Council
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA will work together on the potential to
coordinate opportunities for joint data collection activities.
Local Detail Gauges shall be installed in the Cross Water & the River Duisk to monitor
flow and depth information to inform a future study to commence in Cycle
3. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 420

189 
Flood study (9502)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to improve understanding of river and
surface water flood risk in Barrhill. The interactivity between surface water
and river flooding should be assessed. The impacts of climate change on
flood risk should be evaluated. If flood risk is confirmed, scoping of the next
steps should be completed.
Delivery Lead South Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This action will be funded through South Ayrshire Council's budget
provided by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council will deliver this flood study with information
provided by other relevant responsible authorities, which may include
Scottish Water and SEPA.
Local Detail Flood modelling will be carried out for the Cross Water and River Duisk
Flood Study informed by data gathering in Cycle 2. Where flood risk is
confirmed, scoping of the next steps will be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 421

190 
02/12/19 (Isle of Arran) 
This area is designated as a potentially vulnerable area due to flood risk to Brodick,
Lamlash and Whiting Bay. There is flooding from coastal, river and surface waters. Some
areas of the coastline have been identified as susceptible to coastal erosion. There is the
potential for an increased flood risk due to climate change in some locations. There is a
history of flooding in the area, with recent flooding being caused by coastal flooding. 
There are 3 target area in this potentially vulnerable area, which has been the focus of
further assessment, this is identified below. Further information on the objectives and
actions to manage flood risk within this area is provided below. 
List of target areas 
Brodick (target area 23)
Lamlash (target area 24)
Whiting Bay (target area 25) 
DRAFT
Appendix 2

Page 422

191
multiple outcomes. 
Summary Location map
Flood risk management plan datasheet 
Brodick (target area 23) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river and coastal flooding by
the Brodick flood study (2019) and shoreline management plan (coastal flooding only). There are periodic
records of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
©Crown copyright. All rights reserved. NAC lic no. 100023393
Brodick is located on the Isle of Arran, on the banks of
Strathwhillan Burn and Glen Cloy Burn and at the
mouth of Glenrosa Water. The area is located within
the North Ayrshire local authority area. The main
source of flooding in the area is coastal flooding,
however there are also risks from river and surface
water flooding. There are approximately 50 people
and 60 homes and businesses at risk from flooding.
This is estimated to increase to 220 people and 160
homes and businesses by the 2080s due to climate
change.
DRAFT
Appendix 2

Page 423

Objective ref Objective type Objective Description
231 Avoid flood risk Avoid inappropriate development that increases flood risk
in Brodick
232 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Brodick
233 Prepare for flooding Develop an adaptive approach for coastal erosion to future
flooding resulting from climate change
234 Reduce flood risk Reduce the risk of flooding in Brodick 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (2301)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description North Ayrshire Council to develop detailed design of the Brodick Flood
Protection Scheme, based on the recommended option from the flood
study and carry out public engagement. The recommended option
consists of a combination of property flood resilience measures and direct
defences in the form of a flood embankment (subject to landowner
agreement). The responsible authority proposes this action as the best
viable option for managing flood risk in this community. The delivery of
this action is subject to capital funding being made available.
Delivery Lead North Ayrshire Council.
Indicative Delivery The flood scheme design shall be completed during Cycle 2 (2022 - 2028).
The delivery of this action is subject to Scottish Government capital grant
funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination North Ayrshire Council will coordinate with SEPA, Scottish Water, local
residents, landowners and other stakeholders throughout the design
development of the flood scheme.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping.
Local Detail The detail design for the Brodick Flood Protection Scheme is to include
landowner and property owner engagement on the location of the direct
defences and the propos1e9d2  property flood resilience measures
DRAFT
Appendix 2

Page 424

193 
Community engagement (2302)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description North Ayrshire Council to carry out community engagement linked to the
proposed (funding dependant) Brodick Flood Protection Scheme. A
community engagement plan will be created to cover the time period from
detailed design to implementation of the flood protection solution. The
delivery of this action is subject to capital funding being made available.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be ongoing, linked to the design of the
Brodick Flood Protection Scheme.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified through the development of the
detailed design and the implementation of the Brodick Flood Protection
Scheme.
recommended by the completed flood study. North Ayrshire Council
proposes this action as the best viable option for managing flood risk in this
community.
DRAFT
Appendix 2

Page 425

194 
Flood study (2303)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description North Ayrshire Council to carry out a flood study to investigate the
feasibility of natural flood management measures in the catchment to
address flood risk. This study will include a review of existing models and
flood risk information.
Delivery Lead North Ayrshire Council.
Indicative Delivery This study will be delivered during the second half of Cycle 2 (2025 - 2028).
Funding This study will be funded through North Ayrshire Council's budget provided
by the Scottish Government.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
There are opportunities to work with local landowners/ estate managers
from the upper catchments to jointly develop Natural Flood Management
mitigation measures.
Local Detail Following the already completed Brodick flood study and the proposed
detailed design of the Brodick Flood Protection Scheme, this study shall
investigate the feasibility of Natural Flood Management (NFM) measures to
address residual flood risk in Brodick. 
Strategic mapping improvements (2304)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 426

195 
Shoreline management plan (coastal adaptive plan) (2305)
Action The existing assessment of coastal flood and erosion risk is to be reviewed
and updated as required. The plan should include assessment of climate
change and develop adaptive approaches to allow for the impacts of
climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will work with other relevant responsible authorities,
statutory bodies and key stakeholders identified through the scoping stage
of the planned update to the shoreline management plan.
Local Detail Details of this action will be informed by developments in flood risk
management planning during Cycle 2 (2022-2028). 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 427

multiple outcomes. 
Summary Location map
Flood risk management plan datasheet 
Lamlash (target area 24) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river and coastal flooding by
the Lamlash flood study (2019) and shoreline management plan (coastal flooding only). There is a long record
of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver 196
©Crown copyright. All rights reserved. NAC lic no. 100023393
The coastal village of Lamlash is located on the Isle of
Arran, at the mouth of Benlister Burn at Lamlash Bay.
The area is located within the North Ayrshire local
authority area. The main source of flooding in the area
is coastal flooding, however there are also risks of
river and surface water flooding. There are around
170 people and 100 homes and businesses at risk
from flooding. This is likely to increase to 290 people
and 160 homes and businesses by the 2080s due to
climate change.
DRAFT
Appendix 2

Page 428

197 
Objective ref Objective type Objective Description
241 Avoid flood risk Avoid inappropriate development that increases flood risk
in Lamlash
242 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Lamlash
243 Prepare for flooding Develop an adaptive approach for coastal erosion to future
flooding resulting from climate change
244 Reduce flood risk Reduce the risk of flooding in Lamlash 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
DRAFT
Appendix 2

Page 429

198 
Flood scheme or works design (2401)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description North Ayrshire Council to develop detailed design of the Brodick Flood
Protection Scheme, based on the recommended option from the flood
study and public engagement. The recommended option combines
embankments, flood walls and demountable barriers in order to provide
protection up to the 200 year flood events.
The responsible authority proposes this action as the best viable option for
managing flood risk in this community. The delivery of this action is subject
to capital funding being made available.
Delivery Lead North Ayrshire Council.
Indicative Delivery The flood scheme design shall be completed during Cycle 2 (2022 - 2028).
The delivery of this action is subject to Scottish Government capital grant
funding being made available.
Funding The funding arrangements for Cycle 2 ‘flood scheme or works design’
actions are still to be confirmed by the Scottish Government and COSLA
joint funding group. Until the funding arrangements for these actions and
the community engagement actions related to flood scheme or works
design are confirmed, the draft Local FRM Plan for the Ayrshire Local Plan
District cannot be fully finalised.
Coordination North Ayrshire Council will coordinate with SEPA, Scottish Water, local
residents, landowners and other stakeholders throughout the design
development of the flood scheme.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping and flood warning actions.
Local Detail The detail design for proposed embankments in Lamlash will need to take
account of the recently completed residential development off Glencraig
Place. North Ayrshire Council proposes this action as the best viable option
for managing flood risk in this community.
DRAFT
Appendix 2

Page 430

199 
Community engagement (2402)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description North Ayrshire Council to carry out community engagement linked to the
proposed (funding dependent) Brodick Flood Protection Scheme . A
community engagement plan will be created to cover the time period from
detailed design to implementation of the flood protection solution. The
delivery of this action is subject to capital funding being made available.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be an ongoing, linked to the design of
the Brodick Flood Protection Scheme.
Funding North Ayrshire Council.
Coordination Work by the responsible authorities to develop understanding and help
communities reduce their risk will be coordinated through the Local Plan
District Partnership.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified. The community engagement
plan shall be created to cover the time period from detailed design to
implementation of the flood protection solution. 
Flood study (2403)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description North Ayrshire Council to carry out a flood study to investigate the
feasibility of natural flood management measures in the catchment to
address flood risk. This study will include a review of existing models and
flood risk information.
Delivery Lead North Ayrshire Council.
Indicative Delivery This study will be delivered during the second half of Cycle 2 (2025 - 2028).
Funding This study will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
There are opportunities to work with local landowners/ estate managers
from the upper catchments to jointly develop Natural Flood Management
mitigation measures.
Local Detail This study shall be informed by the completed flood studies and the flood
risk implications of the funding dependant detailed design of the Brodick
Flood Protection Scheme, which includes measures in Lamlash.
DRAFT
Appendix 2

Page 431

200 
Flood defence maintenance (2404)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description North Ayrshire Council is to continue to inspect and maintain the sea
defences. The maintenance regime should be made based on the findings
of the flood study.
Delivery Lead North Ayrshire Council.
Indicative Delivery Flood defence maintenance will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding Maintenance works as required will be funded through North Ayrshire
Council's budget provided by Scottish Government.
Coordination North Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail North Ayrshire Council shall continue to inspect and maintain Council
owned coastal assets in Lamlash and shall cooperate with other asset
owners when they propose or implement maintenance works in the interest
of flood risk management. 
Flood warning maintenance (2405)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 432

201 
Strategic mapping improvements (2406)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community. 
Shoreline management plan (coastal adaptive plan) (2407)
Action The existing assessment of coastal flood and erosion risk is to be reviewed
and updated as required. The plan should include assessment of climate
change and develop adaptive approaches to allow for the impacts of
climate change to be monitored, understood and managed.
Description Further details of this action will be informed by developments in flood risk
management planning between 2022-2028.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034)
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will work with other relevant responsible authorities,
statutory bodies and key stakeholders identified through the scoping stage
of the planned update to the shoreline management plan.
Local Detail Details of this action will be informed by developments in flood risk
management planning between 2022-2028. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 433

multiple outcomes. 202 
Summary Location map
Flood risk management plan datasheet 
Whiting Bay (target area 25) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for coastal flooding by the
shoreline management plan. There are limited records of flooding in this target area. 
The Dynamic Coast project has shown that parts of the shoreline in or adjacent to this target area are subject to
erosion at present or are considered likely to erode in the future. Consideration should be given to how erosion
might impact flood risk. Any actions taken should aim to support building natural resilience to flooding and not
lead to an increase in erosion. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
©Crown copyright. All rights reserved. NAC lic no. 100023393
The village of Whiting Bay is located on the Isle of
Arran, at the mouth of Glenashdale Burn. The area is
located within the North Ayrshire local authority area.
The main source of flooding in Whiting Bay is coastal
flooding, however there are also risks from river and
surface flooding. There are approximately 130 people
and 70 homes and businesses at risk from flooding.
This is estimated to increase to 140 people and 80
homes and businesses by the 2080s due to climate
change.
DRAFT
Appendix 2

Page 434

203 
Objective ref Objective type Objective Description
251 Avoid flood risk Avoid inappropriate development that increases flood risk
in Whiting Bay
252 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Whiting Bay
253 Prepare for flooding Develop an adaptive approach for coastal erosion to future
flooding resulting from climate change
254 Reduce flood risk Reduce the risk of flooding in Whiting Bay
255 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of all existing flood
protection structures 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood study (2501)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out by North Ayrshire Council to improve
understanding of river flood risk, and any interactions with coastal flooding.
The shoreline management plan, the operation of flood warning and
maintenance of flood defences should be reviewed to ascertain if they can
form the basis of any further required flood modelling or be incorporated
into a new flood model if required. The impacts of climate change on flood
risk should be evaluated. If flood risk is confirmed, scoping of the next
steps should be completed.
Delivery Lead North Ayrshire Council.
Indicative Delivery This study will be delivered during the first half of Cycle 2 (2022 - 2025).
Funding This study will be funded through North Ayrshire Council's budget provided
by Scottish Government.
Coordination North Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping and flood warning actions.
Local Detail This study shall investigate river flood risk in Whiting Bay, informed by the
completed Shoreline Management Plan and the performance of existing
flood risk management assets. Where flood risk is confirmed, a second
phase of the study shall be commissioned to scope the next steps towards
reducing flood risk.
DRAFT
Appendix 2

Page 435

204 
Flood defence maintenance (2502)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description North Ayrshire Council is to continue to inspect and maintain flood
protection structures.
Delivery Lead North Ayrshire Council.
Indicative Delivery Flood defence maintenance will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding Maintenance works as required will be funded through North Ayrshire
Council's budget provided by Scottish Government.
Coordination North Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail North Ayrshire Council shall continue to inspect and maintain Council
owned coastal assets in Whiting Bay and shall cooperate with other asset
owners when they propose or implement maintenance works in the
interest of flood risk management. 
Flood warning maintenance (2503)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service when required.
Local Detail N/A.
DRAFT
Appendix 2

Page 436

205 
Strategic mapping improvements (2504)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 437

206 
02/12/20 (Great Cumbrae Island) 
This area is designated as a potentially vulnerable area due to flood risk to Millport. The
main source of flooding is coastal. There is a history of flooding in the area, with recent
flooding being caused by coastal flooding. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Millport (target area 119) 
DRAFT
Appendix 2

Page 438

207 
Summary Location map
Flood risk management plan datasheet 
Millport (target area 119) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources. The national level assessment is improved for river flooding by the Mill Burn
Flood Risk Assessment and for coastal flooding by the Millport Coastal Flood Risk Assessment. There is a long
record of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
Millport is located on Great Cumbrae Island and faces
mainly to the south and onto Millport Bay. The area is
located within the North Ayrshire local authority area.
The main source of flooding in Millport is coastal
flooding, however there is also a risk from river
flooding. There are approximately 638 homes and
businesses at risk from coastal flooding and 124 from
river flooding. This is estimated to increase to 657
homes and businesses for coastal flooding by the
2080s due to climate change.
DRAFT
Appendix 2

Page 439

208 
Objective ref Objective type Objective Description
1191 Avoid flood risk Avoid an increase in flood risk by the appropriate
management and maintenance of all existing flood
protection structures
1192 Avoid flood risk Avoid inappropriate development that increases flood risk
in Millport
1193 Prepare for flooding Prepare for current flood risk and future flooding as a result
of climate change in Millport
1194 Reduce flood risk Reduce the risk of coastal flooding in Millport
1195 Reduce flood risk Reduce the risk of river flooding from the Mill Burn in
Millport 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Flood scheme or works design (11901)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description A non-statutory community consultation was undertaken between 13 July
2020 and 10 August 2020 for Mill Burn Flood Protection Scheme. On the
10 November 2020, North Ayrshire Council cabinet approval was sought
for the preferred option and for submission of a formal scheme notification
to the Scottish Government. Future climate change is considered in the
detailed design, though the scheme is designed to mitigate flooding to a
standard of protection of a 1 in 200 year flood (0.5% annual exceedance
probability) and the agreed preferred option is construction 494 metre long
900mm diameter overflow diversion culvert between Golf Road/Kirkton
Crescent junction and West Bay via Nether Kirkton Farm following the
perimeter of the land. This would provide protection for up to 124
properties on the island in a 1 in 200 years flood event. The Outline
design, Environmental Screening and the Scheme Notification are now
complete and the detailed design is to be completed.
Delivery Lead North Ayrshire Council.
Indicative Delivery The detailed design of the Mill Burn Flood Protection Scheme will be
completed during the first half of Cycle 2. Construction is programmed
to begin in 2023/24 .
Funding 80% of eligible costs shall qualify for Scottish Government grant funding.
The remaining 20% of eligible costs and any other associated costs shall
be met by North Ayrshire Council's budget.
DRAFT
Appendix 2

Page 440

209 
Flood scheme or works implementation (11902)
Action The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Description North Ayrshire Council to progress with procurement and construction of
the Mill Burn Flood Protection Scheme. As built drawings should be made
available to SEPA, for consideration in the Scottish Flood Defence Asset
Database, flood map improvements and flood warning scheme updates.
Delivery Lead North Ayrshire Council.
Indicative Delivery This action shall be delivered during Cycle 2 (2022-2028).
Construction is programmed to begin in 2023/24.
Funding 80% of eligible scheme costs shall qualify for Scottish Government grant
funding. The remaining 20% of eligible costs and any other associated
costs shall be met by North Ayrshire Council's budget.
Coordination North Ayrshire Council will coordinate with SEPA, Scottish Water, local
residents, landowners and other stakeholders throughout the
implementation of the flood scheme.
SEPA will work with the local authority on the potential to coordinate this
action with an update to SFDAD.
Local Detail North Ayrshire Council confirmed the Millburn Flood Protection Scheme on
the 15th June 2021, agreed the indicative project timescale and approved
the commencement of the final design of the scheme.The Mill Burn Flood
Protection Scheme became operative on 16th August 2021.
North Ayrshire Council will coordinate with SEPA, Scottish Water, local
residents, landowners and other stakeholders throughout the design
development of the flood scheme. 
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping.
North Ayrshire Council confirmed the Mill Burn Flood Protection Scheme
on the 15th June 2021, agreed the indicative project timescale and
approved the commencement of the final design of the scheme. The Mill
Burn Flood Protection Scheme became operative on 16th August 2021.
Coordination 
Local Detail
DRAFT
Appendix 2

Page 441

Community engagement (11903)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description Community statutory consultation prior to the Mill Burn Flood Protection
Scheme notification has been completed (2020).
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be ongoing, linked to the design and
implementation of the Mill Burn Flood Protection Scheme.
Funding This action will be funded through North Ayrshire Council's budget provided
by the Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will investigate opportunities for joint community
engagement with other responsible authorities through the Local Plan
District Partnership.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified through the development of the
detailed design and the implementation of the Mill Burn Flood Protection
Scheme. The community engagement plan shall be created to cover the
time period from detailed design to implementation of the flood protection
solution. 
Flood scheme or works design (11904)
Action The selected preferred approach for managing flood risk is to be designed
following the completion of the flood study, including consideration of the
long-term impacts of climate change. These can include small scale works
or works to improve catchment management. This should guide adaptive
planning to allow for the impacts of climate change to be monitored,
understood and managed.
Description On the 10th November 2020 the Cabinet reached the final decision and
confirmed the Millport Coastal Flood Protection Scheme without
modification, agreed the indicative project timescale and approved the
commencement of the final design of the scheme. Future climate change is
considered in the detailed design, though the scheme is designed to
mitigate flooding to a standard of protection of a 1 in 200 year flood (0.5%
annual exceedance probability).
The protection scheme became operational on 13th January 2021 and the
detailed design development started. North Ayrshire Council is developing
the Millport Coastal Flood Protection Scheme with close community
involvement.
Delivery Lead North Ayrshire Council.
Indicative Delivery The flood scheme design was completed prior to the publication of this
Local Flood Risk management Plan.
Funding 80% of eligible costs shall qualify for Scottish Government grant funding.
The remaining 20% of eligible costs and any other associated costs shall
be met by North Ayrshire Council's budget.
Coordination North Ayrshire Council, the Scottish Government, SEPA and Marine
Scotland.
SEPA will work with the local authority on the potential to coordinate this
action with work on coastal flood mapping and flood warning actions.
Local Detail The Outline Design, Environmental Screening, Scheme Notification and
detailed design was completed prior to the publication of this Local Flood
Risk Management Plan.
210
DRAFT
Appendix 2

Page 442

211 
Flood scheme or works implementation (11905)
Action The flood scheme/works is to be built following agreement of the design,
costs and timescales.
Description North Ayrshire Council to progress with procurement and construction of
the Millport Coastal Flood Protection Scheme. As built drawings should be
made available to SEPA, for consideration in the Scottish Flood Defence
Asset Database, flood map improvements and flood warning scheme
updates.
Delivery Lead North Ayrshire Council, Scottish Government and Marine Scotland.
Indicative Delivery The delivery of the Millport Coastal Flood Protection Scheme shall be
completed in Cycle 2 (2022 - 2028).
Construction is programmed to begin in 2022/23.
Funding 80% of eligible scheme costs shall qualify for Scottish Government grant
funding. The remaining 20% of eligible costs and any other associated
costs shall be met by North Ayrshire Council's budget.
Coordination North Ayrshire Council, the Scottish Government, SEPA and Marine
Scotland.
SEPA will work with the local authority on the potential to coordinate this
action with an update to SFDAD and work on coastal flood mapping.
Local Detail The Millport Coastal Flood Protection Scheme became operational on 13
January 2021. The detailed design is complete and construction is due to
begin in 2022/2023. 
Community engagement (11906)
Action Community engagement is to continue to be carried out in the area by the
responsible authorities to raise awareness of flood risk.
Description The community engagement for Millport Coastal Flood Protection
Scheme has been ongoing since 2016.
Delivery Lead North Ayrshire Council.
Indicative Delivery Community engagement will be ongoing throughout Cycle 2 (2022 - 2028)
until the Millport Flood Protection Scheme has been implemented.
Funding This action will be funded through North Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination North Ayrshire Council will investigate opportunities for joint community
engagement with other responsible authorities through the Local Plan
District Partnership.
Local Detail Community engagement will be carried out where issues, constraints,
aspirations and opportunities are identified through the development of the
detailed design and the implementation of the Millport Coastal Flood
Protection Scheme. The community engagement plan shall be created to
cover the time period from detailed design to implementation of the flood
protection solution. DRAFT
Appendix 2

Page 443

212 
Flood defence maintenance (11907)
Action The existing flood defences are to be maintained by the asset owner to
ensure they are in good condition.
Description North Ayrshire Council is to continue to inspect and maintain flood
protection structures.
Delivery Lead North Ayrshire Council.
Indicative Delivery Flood defence maintenance will be an ongoing action throughout Cycle 2
(2022 - 2028).
Funding Maintenance works as required will be funded through North Ayrshire
Council's budget provided by Scottish Government.
Coordination North Ayrshire Council will work in coordination with all relevant
stakeholders identified through the planning and implementation of
maintenance works.
Local Detail North Ayrshire Council shall continue to inspect and maintain Council
owned flood protection assets in Millport and shall cooperate with other
asset owners when they propose or implement maintenance works in the
interest of flood risk management. 
Flood warning maintenance (11908)
Action The Floodline flood warning service is to be kept operational through
maintenance to the existing system and updates being undertaken as
required.
Description SEPA should maintain the Firth of Clyde coastal flood warning scheme.
Delivery Lead SEPA.
Indicative Delivery Ongoing.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authorities on the potential to use information
from the flood schemes and studies along the Firth of Clyde to inform
ongoing flood warning. SEPA will continue to raise awareness of flood
warning, and engage with communities about the service when required.
Local Detail N/A. 
Strategic mapping improvements (11909)
Action SEPA will continue to update flood maps based on new information.
Description SEPA will be undertaking a review of coastal flood modelling in this target
area to identify where it may be appropriate to include the impact of waves
on coastal flooding. We will progress with improved flood modelling and
mapping in the highest priority areas taking account of availability of data to
support the modelling work.
Delivery Lead SEPA.
Indicative Delivery 2025-2028.
Funding SEPA’s role in this action is funded by Scottish Government through
SEPA’s grant in aid settlement.
Coordination SEPA will work with the local authority on the potential to coordinate the
flood map update with any other actions being carried out to understand or
reduce coastal flooding.
Local Detail N/A.
DRAFT
Appendix 2

Page 444

213 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk information is
developed and updated for all areas. A description of these actions is included in the Local Plan District section at
the start of this document
DRAFT
Appendix 2

Page 445

214 
02/12/21 (Kirkmichael) 
This area is designated as a potentially vulnerable area due to flood risk to Kirkmichael.
The main source of flooding is from the Dyroch Burn. There are limited recorded floods in
this area. 
There is 1 target area in this potentially vulnerable area, which has been the focus of further
assessment, this is identified below. Further information on the objectives and actions to
manage flood risk within this area is provided below. 
List of target areas 
Kirkmichael (target area 14) 
DRAFT
Appendix 2

Page 446

215 
Summary Location map
Flood risk management plan datasheet 
Kirkmichael (target area 14) 
What is the current understanding of flood risk? 
This section provides a summary of information, which has helped to develop an understanding of flood risk in
the area. Since 2011 SEPA has developed and updated national level assessments of flooding from rivers,
surface water and coastal sources, and this information has highlighted the risk of flooding in this area. There
are limited records of flooding in this target area. 
What are the objectives for the area? 
In each target area, SEPA and the responsible authorities have set objectives for the management of flood risk.
In some locations, the objectives provide a short-term direction that will be reviewed and updated when more
information is available. In others they provide a long-term direction for the management of flooding within a
community. The objectives along with the current understanding of flood risk help to identify the actions that are
required in the short and long term. It may take several years or multiple 6 year cycles to achieve the identified
objectives, but they set a common goal for multiple agencies. 
The following package of objectives have been established for this area. The objectives must be considered
alongside national principles to manage flood risk. These include: 
• Take a long term, risk-based approach to flood risk management decisions and one that considers the impacts
of and adaptability to climate change. 
• Deliver coordinated and integrated flood risk management by engaging with communities and working in
partnership, sharing data, expertise, services, and resources. 
• Consider whole catchments and coastlines and work with natural processes and the environment to deliver
multiple outcomes.
©Crown copyright. All rights reserved. NAC lic no. 100023393
The village of Kirkmichael is located on the banks of
Dyrock Burn. The area is located within the South
Ayrshire Council area. The main source of flooding in
Kirkmichael is river flooding, however there is also a
small risk of surface water flooding. There are around
140 people and 90 homes and businesses at risk of
flooding. This is likely to increase to 150 people by the
2080s due to climate change and the number of
homes and businesses will remain the same.
DRAFT
Appendix 2

Page 447

216 
Objective ref Objective type Objective Description
141 Avoid flood risk Avoid inappropriate development that increases flood risk
in Kirkmichael
142 Improve data and
understanding
Improve data and understanding of flooding in Kirkmichael 
What actions are proposed for this area? 
As outlined in Section 1 of this plan, at the date of publication the actions below represent the best understanding
of what is needed to work towards the objectives for the area. They have been developed with the other
responsible authorities and take account of progress achieved to date, the understanding of flood risk and the
objectives set for the area. 
NatureScot has identified that they have ‘place priorities’ for this Target Area. During the implementation of the
following actions, the delivery lead should consider engaging with NatureScot to investigate opportunities to deliver
on shared priorities. 
Actions proposed to start between 2022 and 2028 
Data collection (1401)
Action Equipment that measures rainfall, river levels, erosion, ground levels or
wave height may be installed and maintained to improve our understanding
of flood risk. This can be done over short term or to measure longer term
impacts.
Description This may include data collection and monitoring to improve the confidence
in flood sources, mechanisms and risk. A review may be required to assess
the need for rain and/or river gauges. Post flood surveys may be required
to collect data on flooding mechanisms, risk and damage caused. Data
collected can be used to inform future studies.
Delivery Lead Action delivery lead is South Ayrshire Council and coordination will be
determined once the actions have been finalised.
Indicative Delivery This action will be delivered during Cycle 2 (2022 - 2028).
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council and SEPA will work together on the potential to
coordinate opportunities for joint data collection activities.
Local Detail Gauges shall be installed in the Dyrock Burn & The Water of Girvan to
monitor flow and depth information to inform a future study to commence in
Cycle 3. 
Actions proposed after June 2028 
The following actions are proposed to take place after June 2028. These will be reviewed in 2026, considering
added information at that time, to ensure they are still the most appropriate actions for the community.
DRAFT
Appendix 2

Page 448

217 
Flood study (1402)
Action An understanding of flood risk and associated issues in the area is to be
developed, which may include surveys and modelling and should consider
the impacts of climate change on flood risk.
Description A flood study should be carried out to improve understanding of river and
surface water flood risk in Kirkmichael. The interactivity between surface
water and river flooding should be assessed. The impacts of climate
change on flood risk should be evaluated. If flood risk is confirmed, scoping
of the next steps should be completed.
Delivery Lead Action delivery lead is South Ayrshire Council and coordination will be
determined once the actions have been finalised.
Indicative Delivery This action will be delivered during Cycle 3 (2028 - 2034).
Funding This study will be funded through South Ayrshire Council's budget provided
by Scottish Government, subject to any future funding review.
Coordination South Ayrshire Council will deliver this flood study with information provided
by other relevant responsible authorities, which may include Scottish Water
and SEPA.
Local Detail Flood modelling will be carried out for the Dyrock Burn and Water of
Girvan Flood Study, informed by data gathering in Cycle 2. Where flood
risk is confirmed, scoping of the next steps will be completed. 
SEPA and responsible authorities carry out actions in all areas which help to manage current and future flooding.
These actions help to ensure that key aspects of flood risk management are taken forward in all locations. They
ensure that for example new housing developments occur in the right places, and that critical flood risk
information is developed and updated for all areas. A description of these actions is included in the Local Plan
District section at the start of this document.
DRAFT
Appendix 2

Page 449

218 
Annex 1: Costs of Actions
The following information in on costs has been reproduced from the SEPA FRM Plan
for the Ayrshire Local Plan District:
Action Indicative
capital cost (£) Notes
Adaptation plan 30,000 Costs can vary greatly depending on the scale
and complexity of flooding Data collection 20,000 
Flood scheme or works design  300,000
Costs can vary greatly depending on the scale
and complexity of flooding, along with the
ground conditions
Flood study 50,000 
Costs can vary greatly depending on the scale
and complexity of flooding
Flood study (existing flood
defences) 80,000
Flood study (options appraisal) 40,000
Shoreline Management Plan
(Coastal Adaptive Plan) 100,000
Surface water management
plan 30,000
Flood scheme or works
implementation N/A Schemes are very individual and it is not
possible to provide an indicative cost.
The costs involved in the following actions are predominately from staff resource:
Community engagement N/A Resources required are very specific for the
individual action. It is currently not possible
to estimate a resource cost.
Community flood alert N/A
Community resilience group N/A
Emergency plan N/A 
Flood defence maintenance  N/A
Cost of maintenance is specific to the
defence and is impacted by among other
things age and type of the defences. It is not
possible to provide indicative costs.
Flood risk management review N/A 
Resources required are very specific for the
individual action. It is currently not possible
to estimate a resource cost.
Flood warning maintenance N/A
Flood warning scoping N/A
Land Use Planning N/A
Maintain flood protection
scheme N/A
New flood warning area N/A
Property flood resilience
scheme N/A
Sewer flood risk assessment N/A
Site protection plan N/A
Strategic mapping
improvements N/A
DRAFT
Appendix 2

Page 450

219 
Annex 2: Flood Risk Management Plans Consultation
Summary
The following information in Annex 2 is largely reproduced from the SEPA FRM Plan for
Ayrshire:
Asking for and listening to input from stakeholders and the public is a key part of flood
risk management in Scotland. SEPA and the local authorities undertook a joint
consultation, which ran in 2 phases between December 2020 and October 2021.
Phase 1, opened in December 2020 and included a summary of flooding in each Local
Plan District, a description of the potentially vulnerable areas and the identified local
target areas. Phase 2 opened for responses on 30th July 2021 and closed on 31st
October 2021. Phase 2 identified the objectives for each target area and the actions
needed to achieve these objectives. It also included prioritisation of the actions by 6
year cycle. Local authorities provided more detail in the draft local flood risk
management plans, which included an expanded description of the actions, and who
would lead and coordinate delivery. 
The consultation was open to everyone with an interest in flood risk management. 
The communications campaign to publicise the consultation aimed to encourage
anyone with an interest in flooding to have their say on how flood risk is managed
across Scotland. 
Communication activities included: 
• A public notice in the Edinburgh Gazette and The Herald
• A national press release
• Social media posts on Facebook, Twitter, LinkedIn, Instagram
• A national targeted, paid social media campaign on Facebook, Twitter, and
Instagram. 
An animation and graphics were created to promote the consultation. These were
shared with all responsible authorities in advance of the consultation and were
regularly publicised via social media. The consultation was picked up by many local
media outlets including local newspapers. 
SEPA staff also supported several national events aimed at raising awareness of the
consultation.
DRAFT
Appendix 2

Page 451

220 
Demonstration of the consultation platform was provided to ensure that stakeholders
were able to navigate the Citizen Space platform and answer the consultation
questions. 
Local authority flooding teams were provided with briefing packs with access to draft
article templates and social media messages which they could use to promote the
consultation within their own organisation and local area. Many local authorities used
their network of community councils to promote the consultation. 
In total SEPA received 677 responses. These included 654 online responses via the
consultation platform Citizen Space and 23 e-mail responses received via SEPA’s
consultation mailbox. Compared to the first consultation on the flood risk management
strategies in 2014, there has been a welcome three-fold increase in the number of
responses. The majority of the responses (520) were from members of the public. This
reflects increased public awareness of flooding and flood risk management, and the
increasing risk due to climate change. 
SEPA and the local authorities are grateful to individuals and organisations for
considering the proposals and providing feedback. Responses varied from detailed
comments on the actions proposed in individual target areas, to general comments
on flooding and flood risk management. The sections below provide a brief outline of
the responses received and changes made as a result. 
Many of the aspects raised relate to the underlying requirements of the Flood Risk
Management (Scotland) 2009 Act, to activities which are the responsibility of other
organisations, or to the content of the local flood risk management plans. Working
within safe data sharing practices, SEPA will ensure the feedback received is passed
to other responsible authorities to consider and act on. 
This summary is a factual statement of the responses provided. All responses received
have been read and considered, resulting in a number of changes to the both the SEPA
FRM Plan and the Local FRM Plan for the Ayrshire Local Plan District. Further detail on the
analysis of responses will be published by SEPA in Spring 2022. DRAFT
Appendix 2

Page 452

221 
Identifying communities and infrastructure at risk 
In the consultation SEPA asked whether all the main communities and infrastructure
at significant risk of flooding were identified. 45% of respondents agreed that the
main communities and infrastructure were identified and 29% stated they were not
sure. 21% of respondents felt that some communities were missing from the plans. 
Some respondents who had recently flooded were concerned that their communities
were not identified as target areas. Some respondents suggested additional areas for
SEPA to consider where flooding has occurred in the past. Concerns were also
expressed about the method used to identify the main communities at risk. 
Proposed objectives 
34% of respondents supported the proposals for objectives to manage flood risk in
target areas and 30% were not sure. 25% did not agree and 10% did not answer this
question. 
The main concerns of those who did not agree with the proposed objectives were
that timescales were long-term and would not result in immediate action, objectives
did not cover wider issues such as sewerage flooding, objectives were not detailed
enough, and that objectives did not limit new development. There were concerns that
there was no evidence being provided to show that the objectives were being met by
the authorities, and that objectives were not leading to actions on the ground. 
Proposed actions to manage flood risk 
43% of respondents were not sure whether the actions would work towards achieving
the objectives. 25% of respondents did not agree with the proposed actions to
manage flood risk. 20% agreed with the proposed actions and 12% did not answer
this question. 
Those who did not agree expressed concerns that flood studies were not resulting in
actions on the ground, that actions were not detailed enough, some stressed the
need for other actions such as drain clearance being done now and some
emphasised the need for a catchment-based approach and natural flood
management.
DRAFT
Appendix 2

Page 453

222 
Others asked for more watercourse clearing and river management and more
transparency from the local authority in publicising the maintenance plan for flood
defences. Concerns were also expressed that new development is not being
controlled and is contributing to increased surface water flooding and that there were
no actions to address sewerage flooding. Concerns were also raised about funding
for actions. 
NatureScot provided feedback on specific target areas and the impacts on
biodiversity and designated sites. 
Timescales for implementing actions 
In terms of the proposed timescales, 36% of respondents did not agree and 32%
were not sure of the identified timescales. 17% agreed and 15% did not respond to
this question. 
Those who disagreed were concerned that actions were taking too long and that
more urgent action is needed in light of climate change. Respondents also
commented that timescales were too vague and should be more detailed. 
What can individuals, communities and organisations do to help manage flood
risk? 
SEPA also asked whether individuals, communities or organisations were able to
help with flood risk management in Scotland. There was a range of responses to this
question, with 39% of respondents agreeing that there is something they could do to
help manage flood risk and 26% of respondents not sure that there are things they
could do. 
Those who were not sure asked for more guidance from the authorities. However,
many felt that there was something that communities or individuals can do.
Suggestions included less paving of gardens to help attenuate rainwater, authorities
developing information to help the public make more informed decisions, community
organised clearance of watercourses where it is safe to do so, reporting blockages
and flooding to the authorities, planting trees and greening of cities.
DRAFT
Appendix 2

Page 454

223 
Acting on consultation feedback 
Several changes were made to the final flood risk management plans as a result of
the input received during the consultation. A summary of those changes is provided
in the table below, and full details will be provided in the consultation digest to be
published by SEPA in Spring 2022. Changes made to the Local FRM Plan are
summarised in Section 1 of this plan. 
Summary of changes made to the plans following the consultation
1. Further actions were added to manage flood risk in several target areas.
2. Additional Local Plan District actions were added.
3. Some actions were removed from the flood risk management plans at the
request of local authorities responsible for their delivery due to completion in the
time between consultation and publication.
4. Further information was included on how climate change was assessed in the
preparation of the plans.
5. Further information was included on how potentially vulnerable areas were
identified, and when they will be reviewed again.
6. Information was included on the progress made in implementing actions and
working towards objectives in the 2015 strategies.
7. A target area boundary was amended based on new information provided.
8. A description of the importance of community actions, recognising the work that
communities do to manage flooding was included, along with further information
on where support is available to help people reduce their own flood risk.
9. A description of the catchment-based approach SEPA has taken, and the role it
plays in delivering flood risk management actions was provided.
10. The link between flood risk management plans and land use planning was
clarified.
11. Habitats Regulations Appraisal statements were added to each relevant action.
12. Some other changes were made to the way information is presented to try to
make it clearer e.g., on the timing of actions being carried out.
13. Further information was provided on the uncertainty associated with funding of
flood risk management actions.
DRAFT
Appendix 2

Page 455

224 
Annex 3: Acknowledgements 
North Ayrshire Council acknowledges the cooperation and input provided in preparing the
Local FRM Plan for the Ayrshire Local Plan District, including the following:
Ordnance Survey Maps are based upon Ordnance Survey material with the permission of
Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office © Crown
Copyright. Any unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil proceedings. NAC Licence number 100023393 (2021).
The Centre for Ecology and Hydrology Some of the plan development is based upon
digital spatial data licensed from the Centre for Ecology and Hydrology © NERC (CEH) and
third party licensors.
SEPA North Ayrshire Council acknowledges the provision of figures, action tables and
document formatting from the SEPA FRM Plan provided by SEPA, which has formed the
basis of this Local FRM Plan.
Scottish Water North Ayrshire Council acknowledges the inclusion of surface water flooding
data generated by Scottish Water in preparation of flood risk information.
The Flood Hazard Research Centre Multi-coloured Manual and Multi-coloured Handbook
2016.
All contributors to the 2018 NFRA, more information on which can be found at
https://www.sepa.org.uk/data-visualisation/nfra2018/
DRAFT
Appendix 2

Page 456

APPENDIX 3: INDICATIVE COSTS 
Table 3: Indicative costs

Page 457

APPENDIX 4:  OVERVIEW OF ALL AYRSHIRE LOCAL FLOOD RISK MANAGEMENT
PLAN ACTIONS

Page 458

Table 4: Overview of ALFRMP actions

Page 459

APPENDIX 5: NORTH AYRSHIRE FLOOD STUDIES 
Table 5: Detail of North Ayrshire Council Studies
*Carry out a shared NFM Study to save costs
Potentially Vulnerable Objective Target Flood Study Detail Delivery Indicative
Area (PVA) Area (OTA) Cycle Cost Cycle 3
(2028-2034)
02/12/01 (Largs) 148 (Largs north) Largs Coastal Flood Study 2 £80,000 2022-2025
80 (Kilwinning & Dalgarven) SASK Surface Water Management Plan 2 £30,000 2025-2028
121 (Saltcoats and Stevenstion) Saltcoats and Stevenston Surface Water Flood Study 2 £50,000 2022-2025
124 (West Kilbride) West Kilbride Flood Study 3 TBC 2028+
Kilbirnie & Glengarnock Flood Study 2 £50,000 2022-2025
Kilbirnie & Glengarnock Flood Study (Options Appraisal) 2 £40,000
02/12/05 (Irvine to Troon) 22 (Irvine Coastal) Irvine Coastal NFM feasibility Study 2 £50,000 2025-2028
23 (Brodick) Brodick NFM Feasibility Study* 2
24 (Lamlash) Lamlash NFM Feasibility Study* 2
25 (Whiting Bay) Whiting Bay Flood Study 2 £50,000 2022-2025
148 (Largs north)
124 (West Kilbride)
149 (Largs South
22 (Irvine Coastal)
23 (Brodick)
24 (Lamlash)
Indicative Cycle 2 Costs: Cycle 3 Costs: TBC
02/12/02 (Largs to Kilwinning)
97 (Kilbirnie & Glengarnock)
Shoreline Management Plan Various
Indicative Programme
Cycle 2
(2022-2028)
Study Complete
3 TBC 2028+
£50,000
02/12/03 (Upper Garnock catchment)
02/12/19 (Isle of Arran)
2025-2028
£360,000

Page 460

APPENDIX 6: PROGRESS SUMMARY OF FIRST AYRSHIRE LFRMP ACTIONS   
Table 6: Progress summary of Cycle 1 Actions. GREEN denotes an action delivered on programme and within budget; AMBER denotes an
action that was delivered behind programme and / or over budget but that achieved or will achieve what was anticipated by the Local FRM Plan;
RED denotes an action that was delivered behind programme and / or over budget and where the outputs are unlikely to achieve what was
anticipated by the Local FRM Plan. The ticked boxes confirm that the action is now complete or is envisaged to be complete by the publication of
the final progress report.