NORTH AYRSHIRE COUNCIL 
29 November 2022 
Cabinet 
Title:    Treasury Management and Investment Mid-Year Report
2022/23 
Purpose:  To provide Cabinet with a Treasury Management update for the
period 1 April to 30 September 2022. 
Recommendation:  That Cabinet agrees to (a) endorse the contents of the Treasury
Management and Investment Mid-Year Report for 2022/23
(Appendix 1); and (b) note the Prudential and Treasury
Indicators contained therein. 
1. Executive Summary 
1.1 The Treasury Management and Investment Strategy and treasury management
indicators provide a framework for the Council's treasury activities to ensure the
effective control of the risks associated with those activities and the pursuit of
optimum performance consistent with those risks.   
1.2 This mid-year review report: 
• provides an update on performance to 30 September 2022; 
• updates the annual prudential indicators to reflect the latest information available
to the Council; and 
• demonstrates that the treasury management activities carried out during the
period 1 April to 30 September 2022 have been consistent with the Treasury
Management and Investment Strategy 2022/23 and have complied with the
treasury management indicators set out in the Strategy. 
2. Background 
2.1 The Chartered Institute of Public Finance and Accountancy’s (CIPFA) Code of
Practice on Treasury Management (revised 2017) requires that Elected Members are
provided with regular monitoring reports on treasury management activities.  The
Treasury Management Strategy for 2022/23 was approved by Council on 2 March
2022.

Page 2

This report is the Mid-Year Report, providing Cabinet with an update on treasury
management activities for the period 1 April to 30 September 2022.   
An annual report on the treasury management activities for the year will be presented
to Council following the end of the financial year. 
These reports ensure that the Council is meeting best practice in accordance with
CIPFA's Code of Practice. 
2.2 The 2022/23 Mid-Year Report is attached at Appendix 1 and covers: 
• Prudential and treasury indicators; 
• Borrowing and associated rates; and 
• Investments and associated rate of return. 
2.3 This report provides an update on performance to 30 September 2022 and the annual
prudential indicators to reflect the latest information.  It is a statutory duty for the
Council to determine and keep under review its approved borrowing limits and
prudential indicators.  Details within the report demonstrate that, during the period 1
April to 30 September 2022, the Council has operated within the authorised and
operational limits and prudential indicators as set out in the Council's 2022/23 Annual
Treasury Management Strategy Statement (TMSS). 
2.4 The Executive Summary of the Mid-Year Report provides a high level overview of
treasury management and performance, with more detail provided in the body of the
report.  Key points to note are: 
• the re-profiling of capital expenditure into future years and continued use of
internal resources have had an impact on all of the prudential indicators; 
• PWLB interest rates rose by over 2% during the period in both the long and short
term. 
• during the year to date the Council has undertaken no new borrowing . The 
Council has utilised internal short-term cash reserves to temporarily fund any
capital borrowing requirement to 30 September 2022; and 
• investment returns are marginally above the target and this is reflective of the
rising Bank of England base rate which increased from 0.75% to 2.25% during
the period to 30 September. 
3. Proposals 
3.1 It is proposed that Cabinet (a) endorse the contents of the Treasury Management and
Investment Mid-Year Report for 2022/23 (Appendix 1); and (b) note the Prudential and
Treasury Indicators contained therein,

Page 3

4. Implications/Socio-economic Duty 
Financial 
4.1 General Services 
Capital Financing Costs - the Council budgeted £15.654m for financing costs and
expenses on debt for 2022/23.  It is currently estimated that actual costs will total
£12.148m. This underspend will be transferred to the Loans Fund Reserve in line
with the previously agreed policy to support delivery of the capital investment
programme. 
Housing Revenue Account 
Capital Financing Costs - the Council budgeted £12.483m for financing costs and
expenses for debt in 2021/22.  It is currently estimated that actual costs will total
£10.483m.   
In both cases, the main reasons for the underspends are a) the re-profiling of capital
expenditure into future years and b) the current strategy to utilise cash balances,
resulting in savings on external interest costs. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None.

Page 4

5. Consultation 
5.1 The Council's treasury advisors, Arlingclose Ltd, were consulted in the preparation of
this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Treasury Management and Investment Strategy 2022/23 – Council 2 March 2022

Page 5

Treasury Management and
Investment Mid-Year Report 
2022/23

Page 6

2
Contents
1. Purpose 3 
2. Executive summary 4 
3. Prudential and treasury indicators 6
a. The Council’s Capital expenditure and financing 2022/23 6
b. The Council’s overall borrowing need  7
c. Limits to borrowing activity 8
d. Treasury position at 30 September 2022 9
e. Affordability PIs 11 
4. Investment rates in 2022/23 12 
5. Investment position for 2022/23 12

Page 7

3
Treasury Management and Investment Mid-Year
Review 2022/23
1. Purpose
The Council is required by regulations issued under the Local Government in Scotland Act 2003 and
the Chartered Institute of Public Finance and Accountancy’s (CIPFA) Code of Practice on Treasury
Management (revised 2017) to produce a mid-year review of treasury management activities.  The
purpose of this mid-year review is to report the performance of the Council’s treasury operation and
how this measures up against the Council’s Treasury Management and Investment Strategy.  This is
done through the publication of updated prudential and treasury indicators for 2022/23.  
This report meets the requirements of both the CIPFA Code of Practice on Treasury Management (the
Code) and the CIPFA Prudential Code for Capital Finance in Local Authorities (the Prudential Code). 
CIPFA published its revised Treasury Management Code of Practice [the TM Code] and Prudential Code
for Capital Finance in December 2021. The key changes in the two codes are around permitted reasons
to borrow, knowledge and skills, and the management of non-treasury investments. The principles
within the two Codes took immediate effect although local authorities could defer introducing the
revised reporting requirements within the revised Codes until the 2023/24 financial year if they wish
which the council has elected to do. This report has therefore been prepared in compliance with the
2017 codes. 
During 2022/23, to meet the minimum reporting requirement, the following reports should be
submitted to Elected Members: 
• an annual treasury management and investment strategy (submitted to the Council on 2 March
2022)
• the capital strategy (submitted to the Council on 2 March 2022)
• a mid-year treasury update report (this report)
• an annual review following the end of the year describing the activity compared to the strategy
(will be submitted to Council in June 2023) 
Regulations place responsibility on members for the review and scrutiny of treasury management
policy and activities.  This report is, therefore, important in that respect, as it provides details of
treasury activities for the six months to 30 September 2022 and highlights performance against the
Council’s policies previously approved by members.

Page 8

4
2. Executive Summary
During the six month period to 30 September 2022, the Council complied with its legislative and
regulatory requirements.   
The key prudential and treasury indicators for 2022/23 have been updated based on the latest
available information and will be used to assess performance at the end of the year. 
TABLE 1 
A summary of performance is provided below with more detailed information provided in the body of
the report. 
Capital Expenditure for both the General Fund and HRA vary from original estimates due to changes in
the profile of projects. Full details of all movements in the capital expenditure budgets are included in
the capital programme performance reports submitted to Cabinet throughout the year. 
The Capital Financing Requirement (CFR) is the underlying borrowing requirements of the Council. 
The reduction to the requirement during 2022/23 reflects the change in profile of the capital
programme. 
Gross Borrowing reflects the actual borrowing which has been undertaken. This is projected to be
lower than anticipated due to the revised profile of capital projects and the continued use of internal
funds, the latter being a key element of the Treasury Management Strategy to minimise costs. 
The Operational Boundary is the maximum we would anticipate borrowing to fund the current year
capital programme building in flexibility for the timing of the different funding streams and principal
repayments.  The in-year variance is linked to the continued use of internal funds and the re-profiling
of the capital programme. 
The Authorised Limit is set at 10% above the Operational Boundary to give some flexibility to raise
funds for future year capital investment. 
2022/23 2022/23
Prudential and treasury indicators Original Estimate Revised Estimate
£m £m
Capital expenditure (Indicator 1)
·             Non-HRA                   124.152                      63.428
·             HRA                   114.507                      60.963
·             Total                   238.659                    124.391
Capital Financing Requirement (CFR):
·             Non-HRA                   298.935                    222.683
·             HRA                   229.034                    193.092
·             Total                   527.969                    415.775
Gross borrowing (Indicator 4)                   517.969                    321.314
Operational Boundary (Indicator 5)                   547.562                    431.623
Authorised Limit (Indicator 6)                   602.318                    474.785
Investments (Indicator 8)
·             Longer than 1 year -  -
·             Under 1 year                     20.000                      44.304
·             Total                     20.000                      44.304

Page 9

5
The Council has a strategy of taking a combination of temporary and permanent borrowing in
recognition of the Council’s longer term borrowing requirements and the market rates available at
that time. This balances short term financial savings with longer term security of costs. During the
period 1 April to 30 September 2022 the Council undertook no new borrowing. 
Over the April-September period short term PWLB rates rose dramatically, particular in late September
after the Chancellor’s ‘mini-budget’ prompted a fall in sterling and rise in market interest rate
expectations. As a result of the increased borrowing rates, the Council will continue its current strategy of
using internal funds instead of borrowing in order to minimise exposure to external interest rates. Where an
in year borrowing requirement is identified, short term borrowing options will be explored as an interim
measure until market stability is regained. 
Affordability of borrowing is measured by a number of indicators, including the impact of: 
• Percentage of financial costs relative to the net revenue stream of the General fund and
Housing Revenue Account. 
As at 30 September 2022 the above indicator shows estimated ratios of 3.1% and 21.3% for General
Fund and HRA respectively. Capital expenditure impacts on the revenue budget through financing
charges so it is essential the Council ensures the financing costs remain affordable and do not
constitute an excessive proportion of the revenue resources available. From a General Fund
perspective, the latest Scottish Local Authority average was 5.86%, therefore demonstrating a prudent
borrowing policy. For the HRA, the latest Scottish average was 21.62%. The level of loan charges is
deemed prudent and affordable within the framework of the 30 year Housing business plan. 
The average investment rate to 30 September 2022 was 0.8%, compared to a target of 0.50% and
actual in 2021/22 of 0.15%. The return secured this year to date reflects the  Bank of England base rate
which has risen from 0.75% at the beginning of the financial year to 2.25% at 30 September.  A further
rate increase to 3% was announced on the 3 November with further increases anticipated. The
Council’s objective when investing money is to strike an appropriate balance between risk and return,
minimising the risk of incurring losses from defaults and the risk of receiving unsuitably low
investment income.   
Other prudential and treasury indicators and supporting information can be found in the main body of
this report. 
Conclusion 
The Head of Finance confirms that long-term borrowing is only undertaken for a capital purpose and
the statutory borrowing limit (the authorised limit) has not been breached.

Page 10

6
3. Prudential and Treasury Indicators for 2022/23 
The Prudential Code establishes a framework to ensure Councils demonstrate effective control over
levels of, and decisions relating to, capital investment activity including borrowing.  The Treasury
indicators are used to ensure that risk is managed and controlled effectively.  Together the Prudential
and Treasury Indicators consider the affordability and impact of capital expenditure decisions and set
out the Council’s overall capital framework. 
These indicators help the Council to demonstrate public accountability in relation to borrowing and
investments.  As part of this accountability this report will summarise the following: - 
• Capital activity during the year (section a);
• Impact of this activity on the Council’s underlying debt (the Capital Financing Requirement)
(section b);
• The actual prudential and treasury indicators (section a – e);
• Overall treasury position identifying how the Council has borrowed in relation to this debt, and
the impact on investment balances (section e);
• Detailed debt activity (section e); and
• Summary of interest rate movements in the year (section 4);
• Detailed investment activity (section 5). 
(a)  The Council’s Capital Expenditure and Financing 2022/23
(Prudential Indicator 1)
The Council incurs capital expenditure when it invests in its long term assets.  Capital Expenditure can
be funded in two main ways: 
• Financed immediately through the application of capital or revenue resources (capital receipts,
capital grants, revenue contributions etc.), which has no resultant impact on the Council’s
borrowing need; or
• If insufficient financing is available, or a decision is taken not to apply other resources, the
capital expenditure will give rise to borrowing, which is approved as part of the Council’s
investment plans.   
The tables below show the planned capital expenditure for 2022/23 and the latest forecast alongside
the amount estimated to be financed in year and the amount which will give rise to borrowing. 
TABLE 2 
2022/23 2022/23
General Fund Original Estimate Revised Estimate
£m £m
Capital expenditure (Indicator 1)                   124.152                      63.428
Financed in year from external funding and reserves                     29.637                      33.750
Unfinanced capital expenditure                      94.515                      29.678
2022/23 2022/23
HRA Original Estimate Revised Estimate
£m £m
Capital expenditure (Indicator 1)                   114.507                      60.963
Financed in year from external funding and reserves                     29.131                      18.132
Unfinanced capital expenditure                      85.376                      42.831

Page 11

7
(b) The Council’s Overall Borrowing Need (the Capital Financing
Requirement) (Prudential Indicators 2 and 3)
This indicator outlines the Council’s Capital Financing Requirement (CFR).  The CFR is simply the total
historic outstanding capital expenditure which has not been paid from either a capital or revenue
resource and therefore needs to be funded from borrowing.  It is essentially a measure of the Council’s
underlying borrowing need. 
Part of the Council’s treasury activity is to meet the funding requirements for this borrowing need. 
The treasury management section organises the Council’s cash position to ensure that sufficient cash
is available to meet the capital plans and cash flow requirements.  This may be sourced through
borrowing from external bodies (such as the Government through the Public Works Loan Board
[PWLB], or the money markets), by utilising temporary cash resources within the Council or through
temporary borrowing from other local authorities. 
The Council’s underlying borrowing need (CFR) is not allowed to rise indefinitely.  The Council is
required to make an annual revenue charge, called the Loan Fund Principal Repayment.  This is
effectively a repayment of the borrowing need and it is charged to revenue over the life of the asset. 
This charge reduces the CFR each year. This differs from the treasury management arrangements
which ensure that cash is available to meet capital commitments.  External debt can also be borrowed
or repaid at any time, but this does not change the CFR. 
The total CFR can also be reduced by: 
• the application of additional capital financing resources (such as unapplied capital receipts); or 
• increasing the annual revenue charge 
The Council’s CFR for the year is shown in the following table and is a key prudential indicator.  The
opening balance excludes the PPP / NPD schemes because no borrowing is actually required against
these schemes as a borrowing facility is included in the contract. 
Table 3 shows that, based on historic capital expenditure and this year’s capital expenditure, the
Council has a cumulative underlying borrowing need of £415.775 forecast at 31 March 2023.  This is
lower than the original estimate largely as a result of changes in the profile of capital projects. 
TABLE 3 
2022/23 2022/23
CFR Original Estimate Revised Estimate
£m £m
Opening Balance                   357.927                    352.988
Add unfinanced capital expenditure (General Fund and HRA per
Table 2)                   179.891                      72.509
Less Loans Fund Principal Repayments                     (9.849)                     (9.722)
Closing balance (Indicator 2)                   527.969                    415.775
Annual Change (Indicator 3)                   170.042                      62.787

Page 12

8
c) Limits to Borrowing Activity (Prudential Indicators 4 - 6)
Borrowing activity is constrained by the prudential indicators for CFR, gross borrowing and by the
authorised limit to ensure the Council operates its activities within well-defined limits. 
Gross borrowing and the CFR 
There is a need to ensure that gross debt does not, except in the medium term, exceed the total CFR
(i.e. the Council does not borrow more than it needs to fund its capital programme).  In exceptional
circumstances Councils are allowed to borrow to cover the current financial year plus the next two
financial years (i.e. to 2023/24).  This provides some flexibility to borrow in advance where this is
appropriate.   
Table 4 highlights the Council’s forecast gross borrowing position against the CFR and confirms that at
30 September 2021 the Council has complied with this prudential indicator as gross borrowing is
currently within its CFR.  The Council is currently under-borrowed by £166.762m due to the continuing
strategy to delay long-term external borrowing by utilising internal cash balances. 
TABLE 4 
As part of its annual Treasury Management and Investment Strategy the Council sets limits for external
borrowing which it is not normally expected to exceed.  These limits are explained below. 
The Operational Boundary 
The operational boundary is the expected maximum borrowing position of the Council during the year,
taking account of the timing of various funding streams and the recharge of principal repayments from
the revenue account.  Periods where the actual position varies from the boundary is acceptable
subject to the authorised limit not being breached. 
The Authorised Limit 
The authorised limit represents a limit beyond which external debt is prohibited.  Performance against
the approved strategy is monitored throughout the year and reported to Cabinet as appropriate.
However, ultimate responsibility for setting or adjusting this limit lies with full Council.  The current
limit is set at 10% of the Operational Boundary. 
Table 5 demonstrates that between 1 April and 30 September 2022 the Council’s gross borrowing was
within both the operational boundary and its authorised limit, by a significant margin due to the
continuing strategy to delay new external borrowing by utilising internal cash balances and changes in
the capital programme that have resulted in a reduced borrowing requirement.    
2022/23 2022/23 30 September 2022
Original Estimate Revised Estimate Actual
£m £m £m
Gross borrowing position (Indicator 4)                   517.969                    321.314                    249.013
CFR                   527.969                    415.775                    415.775
(Under)/Over Borrowed Position                   (10.000)                   (94.461)                  (166.762)

Page 13

9
TABLE 5   
(d) Treasury Position at 30 September 2022 (Prudential Indicators
7 - 11)
The Council’s debt and investment position is organised by the treasury management service to ensure
adequate liquidity for revenue and capital activities, security for investments and to manage risks within
agreed parameters.  Procedures and controls to achieve these objectives are well established through both
Member reporting and the Council’s Treasury Management Practices. 
Borrowing Strategy for 2022/23 
The Borrowing Strategy for 2022/23 anticipated bank interest rates rising to 1% during 2022/23 and
fixed borrowing rates to remain steady.  Variable, or short-term rates, were expected to be the
cheaper form of borrowing over the period.  Continued economic uncertainty has promoted a
cautious approach, whereby investments continue to be dominated by low counterparty risk
considerations, resulting in relatively low returns compared to borrowing rates. 
Over the April-September period short term PWLB rates rose dramatically, particular in late September
after the Chancellor’s ‘mini-budget’ prompted a fall in sterling and rise in market interest rate
expectations. Interest rates rose by over 2% during the period in both the long and short term. As an
indication the 5-year maturity certainty rate rose from 2.30% on 1st April to 5.09% on 30th September;
over the same period the 20-year maturity certainty rate rose from 2.67% to 4.90%. Although interest
rates across the board have risen, short-term borrowing from other local authorities remains at lower
interest rates than long term borrowing.  The Bank of England Bank Rate has risen from 0.75% to
2.25% during the period to 30 September with a further increase on 3 November to 3%. 
As a result of the increased borrowing rates, the Council’s current strategy is to use internal funds instead of
borrowing. The Council’s treasury advisors are forecasting that borrowing rates will fall over the medium
term and that if borrowing is required in year, then short term borrowing will be explored to bridge the gap
until more normal levels of market volatility are restored. 
The following graph demonstrates that PWLB rates have remained relatively steady during the period April
to September 2022.   
Estimated Revised
£m £m
Average gross borrowing position 1 April to 30 September 2022 253.621
Maximum gross borrowing position 1 April to 30 September 2022 264.741
Operational boundary per Treasury Strategy 2022/23
(Indicator 5) 547.562 431.623
Authorised limit per Treasury Strategy 2022/23
(Indicator 6) 602.318 474.785

Page 14

10 
CIPFA’s 2021 Prudential Code is clear that local authorities must not borrow to invest primarily for financial
return and that it is not prudent for local authorities to make any investment or spending decision that will
increase the capital financing requirement, and so may lead to new borrowing, unless directly and primarily
related to the functions of the Authority. 
Local authorities can borrow from the PWLB provided they can confirm they are not planning to purchase
‘investment assets primarily for yield’ in the current or next two financial years, with confirmation of the
purpose of capital expenditure from the Section 95 Officer.  Authorities that are purchasing or intending to
purchase investment assets primarily for yield will not be able to access the PWLB except to refinance
existing loans or externalise internal borrowing. 
The Council is not planning to purchase any investment assets primarily for yield within the next three years
and so is able fully access the PWLB. 
Borrowing Position for 2022/23 
To date in 2022/23, the Council has undertaken no new borrowing. The Council has used internal
short-term cash reserves to temporarily fund its capital borrowing requirement to 30 September 2022.   
In terms of outlook for the remainder of the year, based on current capital plans and replacement
borrowing requirements, it is estimated that the Council will borrow £64.860m this financial year, with
a forecasted planned under borrowed position of £94.461m at the end of March 2023. 
Rescheduling 
No rescheduling has taken place between 1 April 2022 and 30 September 2022 as the average
differential between PWLB new borrowing rates and premature repayment rates made rescheduling
unviable.   
The Council’s treasury position (excluding borrowing by PPP/NPD and finance leases) at the 31 March 2022
and 30 September 2022 was as follows:

Page 15

11
TABLE 6 
All investments at 30 September 2022 mature within one year in line with the Treasury Management and
Investment Strategy (Indicator 9). 
The maturity structure of the debt portfolio (Indicator 10) at 30 September 2022 is shown below and shows
the period when the Council is required to repay and/or refinance debt. It is important to ensure a
reasonable spread of debt to mitigate against high exposure levels in respect of refinancing.  The current
profile ensures this: 
TABLE 7 
The next indicator is used to manage risk and reduce the impact of adverse movement in interest rates.  This
sets a limit on the Council’s exposure to fixed and variable interest rates (Indicator 11). The Council
approved a limit on variable borrowing of £60.000m in the Treasury Management Strategy 2022/23.   
TABLE 8 
(e)  Affordability Prudential Indicators (Prudential Indicator 12 - 14)
These Prudential Indicators assess the affordability of capital investment plans and provide an indication of
the impact of capital investment plans on the Council’s overall finances. The cost impact of borrowing
decisions are reflected in the Council’s budget as loan charges. 
31 March 2022 30 September
Principal Rate/ Return Principal Rate/ Return
£m % £m %
Fixed rate funding:
-PWLB                   181.055 4.68%                   179.611 4.73%
-Other Local Authorities                     25.000 0.10%                     16.972 0.35%
-Market                       1.522 8.40%                       1.480 8.64%
Variable rate funding:
-Market                     50.950 5.10%                     50.950 5.10%
Total debt (Indicator 7)                   258.527 4.34%                   249.013 4.53%
CFR                   352.988                    415.775
Over / (under) borrowing                   (94.461)                  (166.762)
Investments:
- internally managed                     43.506 0.15%                    (44.304) 0.80%
Total investments (Indicator 8)                     43.506                     (44.304)
31-Mar-22 30 September 2022
Maturity Profile of Borrowing (Indicator 10) Actual Actual
£m £m
Under 12 months                      76.911                      68.873
12 months and within 24 months                       2.950                        3.030
24 months and within 5 years                     10.050                        9.938
5 years and within 10 years                     24.439                      24.439
10 years and within 20 years                     28.665                      31.421
20 years and within 30 years                       6.625                        2.425
30 years and within 40 years                   106.887                    106.887
40 years and within 50 years                       2.000                        2.000
2022/23 30 September 2022
Original Limits Actual
£m £m
Limits on fixed interest rates based on net debt (Indicator 11)                   602.318                    474.785
Limits on variable interest rates based on net debt (Indicator 11)                     60.000                      50.950

Page 16

12 
The actual and estimates of the ratio of financing costs to net revenue stream indicator identifies the trend
in the cost of capital (borrowing and other long-term liabilities net of investment income) against the net
revenue stream. 
TABLE 9 
Capital expenditure impacts on the revenue budget through financing charges so it is essential the
Council ensures the financing costs remain affordable and do not constitute an excessive proportion of
the revenue resources available. 
From a General Fund perspective, the latest Scottish Local Authority average was 5.86%, thereby
demonstrating a prudent borrowing policy. 
For the HRA, the latest Scottish average was 21.62%. The level of loan charges is deemed prudent and
affordable within the framework of the 30 year Housing business plan. 
4. Investment Rates in 2022/23 
The Bank Rate has risen from 0.75% to 2.25% during the period April to September. The Bank Rate was
raised by a further 0.75% on the 3 November to 3%. The Council’s treasury advisers, Arlingclose, currently
project that the bank rate will peak at 4.25% with a further 0.5% increase in December and smaller rises in
2023 .  The ongoing conflict in Ukraine has continued to put pressure on global inflation and the economic
outlook for UK and world growth remains weak. The UK political situation towards the end of the period
following the ‘fiscal event’ increased uncertainty further 
5. Investment Position for 2022/23
Investment Policy 
The Council’s investment policy is governed by Scottish Government investment regulations, which have
been implemented in the annual treasury management and investment strategy, approved by Council on 2
March 2022.  This policy sets out the approach for choosing investment counterparties, based on credit
ratings provided by the three main credit rating agencies and supplemented by additional market data (such
as rating outlooks, credit default swaps, bank share prices etc.).   
All investments during 2022/23 have complied with our investment policy. 
Resources 
The Council’s cash balances comprise revenue and capital resources and cash flow monies.  The Council’s
cash resources at 30 September 2022 were as follows: 
Estimate of ratio of financing costs to net revenue stream 2022/23 2022/23
(Indicator 14) Original Estimate Revised Estimate
£m £m
General Services 3.7% 3.1%
HRA 21.7% 21.3%

Page 17

13
TABLE 10 
Investments held by the Council 
The Council has maintained an average balance of £44.156m of invested funds and utilised cash balances
during the year in support of the under-borrowed position.   
The Council’s treasury management advisors, Arlingclose Limited, have five Scottish unitary authorities in
their client group and provide regular investment benchmarking information to the Council.  In terms of
investment performance, North Ayrshire Council’s average weighted rate of return on investments during
the period 1 April 2021 to 30 September 2022 was 0.80% (0.15% for the period to 30 September 2021).  The
actual rate of return on investments as at 30 September for North Ayrshire Council was 1.58% compared to
the group average rate of 1.85%. 
The target investment rate for 2022/23 was 0.50% and the slightly higher weighted average return in
the first half of the year reflects the rising Bank of England Base Rate. 
We will continue to invest with approved counterparties in accordance with the approved strategy.
Cash Balances 2022/23 Actual
£m
1 April 2022                     43.506
30 September 2022                     44.304
Change within 6 months                       0.798