Democracy Spraffa

Agenda Document Pack - Cabinet - 01/11/2022

North Ayrshire Council · 1 November 2022
Back to Cabinet — 1 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Cabinet 
A Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
01 November 2022 at 14:30 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 27
September 2022 will be confirmed and the Minutes signed in accordance
with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973 (copy enclosed).  
GENERAL BUSINESS FOR DECISION  
Report by the Executive Director (Communities and Education) 
3 Proposals for Community Investment Fund (CIF) Expenditure
Submit a report by the Executive Director (Communities and Education)
on applications by Locality Partnerships to allocate CIF funding to proposed
projects (copy enclosed).  
Reports by the Executive Director (Place)
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
4 Update on Humanitarian Protection for People from Ukraine
Submit a report by the Executive Director (Place) on the range of
supports being offered by the Council and its community planning
partners to those people seeking sanctuary from the conflict in Ukraine
(copy enclosed). 
5 Strathclyde Partnership for Transport – Regional Transport Strategy
consultation
Submit a report by the Executive Director (Place) on seeking approval for
the proposed North Ayrshire Council submission to the Strathclyde
Partnership for Transport’s consultation on the new Regional Transport
Strategy (copy enclosed). 
6 Millport Coastal Flood Protection Scheme: Update
Submit a report by the Executive Director (Place) on the latest position in
respect of the award of contract for the construction of the Millport Coastal Flood
Protection Scheme (copy enclosed).   
7 Strategic Housing Investment Plan 2023-2028
Submit a report by the Executive Director (Place) seeking approval of the
Strategic Housing Investment Plan 2023-2028 (copy enclosed). 
8 Estates Based Regeneration Programme (EBRP) Update
Submit a report by the Executive Director (Place) on the delivery of the
HRA Estates Based Regeneration Programme (EBRP) and seeking
approval for a refreshed programme for 2022-2029 (copy enclosed). 
9 Rapid Rehousing Transition Plan Progress
Submit a report by the Executive Director (Place) on the implementation
of the North Ayrshire Rapid Rehousing Transition Plan and seeking
approval for the priorities identified for year four of the plan (copy
enclosed). 
10  Roads Winter Service and Weather Emergencies Plan 2022/23 
Submit a report by the Executive Director (Place) on the Roads Winter
Service and Weather Emergencies Plan 2022/23 (copy enclosed).  
Report by the Director (Growth and Investment) 
11  i3 – Sale of Land at Strategic Investment Campus
Submit a report by the Director (Growth & Investment) on the proposal for
the sale of 2 acres of land at the Strategic Investment Campus, i3, Irvine,
subject to appropriate conditions (copy enclosed). 
12  Urgent Items
Any other items which the Chair considers to be urgent.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
13  Exclusion of the Public - Paras 8 & 9
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraphs
8 & 9 of Part 1 of Schedule 7A of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer.  
Report by the Director (Health and Social Care Partnership) 
14  Island Accommodation
Submit a report by the Director (HSCP) on the above (copy enclosed)  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Cabinet Sederunt 
Marie Burns (Chair)
Shaun Macaulay (Vice-Chair)
Scott Davidson
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen 
Chair: 
Apologies: 
Attending: 
4

Page 5

Cabinet
27 September 2022
IRVINE, 27 September 2022 - At a Meeting of the Cabinet of North Ayrshire Council
at 2.30 p.m.
Present
Marie Burns, Scott Davidson, Margaret Johnson, Christina Larsen, Shaun Macaulay,
Andrew Bruce, Elizabeth Turbet, Rev Mark Goodman (Church Representatives) and
Jackie MacKenzie (Teaching Representative) (Agenda Items 1 – 7).
Also Present
Cameron Inglis, Davina McTiernan and Chloé Robertson.
In Attendance
R. McCutcheon, Executive Director (Place); A. Sutton, Executive Director, C. Amos,
Head of Service (Education), Andrew McClelland, (Head of Service (Education) and
R. Arthur, Head of Service (Connected Communities) (Communities & Education); C.
Cameron, Director (Health and Social Care Partnership), S. Hunter, Chief Social
Work Officer and P. McArthur, Senior Manager (Addictions) (Health and Social Care
Partnership); M. Boyd, Head of Service (Finance), F. Walker, Head of Service
(People & ICT), D. Forbes, Senior Manager (Finance Management), L. Miller, Senior
Manager (Audit, Fraud, Safety and Insurance) and J. Walls, Team Manager (Health
& Safety) (Chief Executive’s Service); R. Lynch, Senior Manager and L. Taylor,
Team Manager (Legal Services), M. Sugden, Communications Officer, I. Hardy,
Team Manager (Policy and Performance), H. Clancy and A. Little, Committee
Services Officers (Democratic Services).
Apologies
Tony Gurney and Alan Hill
Chair
Marie Burns in the Chair.
1. Minutes
The Minutes of the Meeting of the Cabinet held on 23 August 2022 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the
Local Government (Scotland) Act 1973.
2. Declarations of Interest
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors.
Agenda Item 2
5

Page 6

3. Education Service Standards and Quality Report 2021/22 
Submitted a report by the Executive Director (Communities and Education) on key
progress towards the Education Service Improvement Priorities and the National
Improvement Framework Priorities for session 2021-22. The Education Service
Standards & Quality Report 2021/22 was attached at Appendix 1 to the report. 
Members asked a question and were provided with further information in relation to
the improvement in attainment and the additional measures put in place to support
this. 
The Cabinet agreed to (a) note the content of the report and (b) approve the
publication of the report. 
4. Education Service Improvement Plan 2022-23 
Submitted a report by the Executive Director (Communities and Education) seeking
approval for the statutory Education Service Improvement Plan for 2022-23, in the
context of the National Improvement Framework. The Education Service
Improvement Plan 2022/23 was set out at Appendix 1 to the report. 
The Cabinet agreed to (a) approve the content of the Educational Service
Improvement for 2022–23 plan set out at Appendix 1 to the report; and (b) approve
the publication of the plan. 
5. South West Educational Improvement Collaborative (SWEIC) Report and
Plan 2022-23 
Submitted a report by the Executive Director (Communities and Education) on
progress made towards the SWEIC Plan in 2021-22 and present an updated SWEIC
Plan for 2022.  The SWEIC Report 2021/22 and SWEIC Plan 2022/23 were set out
at Appendices 1 and 2, respectively, to the report. 
The Cabinet agreed to (a) note the progress outlined in the 2021-22 annual SWEIC
report set out at Appendix 1 to the report; and (b) approve the draft SWEIC Plan for
2022-23 set out at Appendix 2, for submission to Scottish Ministers. 
6. Kilwinning Early Years Centre 
Submitted a report by the Executive Director (Communities and Education) to carry
out a Statutory Public Consultation on the proposal to close Kilwinning Early Years
Centre to allow its incorporation into Pennyburn Primary School as an early years
class. 
The Cabinet agreed to approve the proposal to carry out a Statutory Public
Consultation on the proposal to close Kilwinning Early Years Centre to allow its
incorporation into Pennyburn Primary School as an early years class. 
6

Page 7

7. North Ayrshire Council Strategic Community Learning and Development
Plan 2021-2024 Year 1 Progress Report 
Submitted a report by the Executive Director (Communities and Education) providing
an update on the North Ayrshire Council Strategic Community Learning and
Development Plan 2021-2024 through the Year 1 Progress Report. The North
Ayrshire CLD Strategic Plan 2021/2024 - Year 1 Progress Report and North Ayrshire
CLD Plan (September 2021/24) were set out at Appendices 1 and 2, respectively, to
the report. 
The Cabinet (a) reviewed the North Ayrshire CLD Strategic Plan 2021-2024 Year 1
Progress Report set out at Appendix 1 to the report; and (b) authorise officers to take
forward the second year of the Action Plan, with specific regard to addressing the
identified unmet needs. 
8. Revenue Budget 2022/23: Financial Performance to 31 July 2022 
Submitted a report by the Head of Service (Finance) on the financial performance for
Council at 31 July 2022. Detailed explanations of the significant variances in service
expenditure compared to the approved budgets, together with information on funding
to be carried forward to support expenditure during 2022/23 were provided in
Appendices 1-4 of the report. A full list of the proposed carry forward of earmarked
funds was set out at Appendix 5 to the report. Information in respect of the Housing
Revenue Account (HRA) was set out in Appendices 6 and 6a to the report.
Information on the IJB financial performance was set out in Appendix 7 to the report. 
Members asked questions and were provided with further information in relation to
the impact on rising costs of borrowing and the increase reversal of National
Insurance. 
The Cabinet agreed to (a) note (i) the information and financial projections outlined in
the report and its associated appendices and (ii) the latest financial projection for the
Health and Social Care Partnership highlighted at 2.6 of the report; and (b) approve
(i) the earmarking of £0.486m identified at section 2.5 of the report to meet future
year commitments and (ii) the virements detailed at Appendix 7 to the report. 
9. Capital Programme Performance to 31 March 2023 
Submitted a report by the Head of Service (Finance) on progress in delivering the
Capital Investment Programme for 2022/23. 
The Cabinet agreed to note (i) the revisions to budgets outlined in the report, (ii) the
General Services and HRA revised budgets at 31 July 2022, and (ii) the forecast
expenditure to 31 March 2023. 
10. Health and Safety Annual Report 2021/22 
Submitted a report by the Head of Service (Finance) providing an update on the
Health and Safety performance within Council Services during 2021/22. 
7

Page 8

The Cabinet agreed to note (i) the Annual Health & Safety Performance update for
2021/22 and the comparison against 2019/20 and 2020/21, and (ii) the response to
the COVID Pandemic and the delivery of a COVID safe election. 
11. Determination of the Detailed Emergency Planning Zone (DEPZ) for
Hunterston A and B Nuclear Power Stations 
Submitted a report by the Head of Service (Democratic Services) on the extent of the
Detailed Emergency Planning Zone (DEPZ) for Hunterston A and B Nuclear Power
Stations, under the Radiation (Emergency Preparedness and Public Information)
Regulations 2019 (REPPIR). 
The Cabinet agreed to (a) determine the DEPZ for Hunterston A as 0km,
recommended by the Operator; and (b) determine the boundary of the DEPZ for
Hunterston B to 1.08km and to be extended to utilise the natural roads and
topography, as shown delineated in blue on the plan set out at Appendix 4 to the
report. 
12. Year End Performance Reporting: Council Plan Year End Progress
Report 2021-22, Annual Performance Report 2021-22 and Local
Government Benchmarking Framework Report 2020-21 
Submitted a report by the Head of Service (Democratic Services) on the progress of
the Council Plan priorities. The Council Plan Year End Progress Report and
supporting performance measures were set out at Appendices 1, 2 and 3 of the
report. The Council’s Annual Performance report and the 2020-21 Local Government
Benchmarking Framework report were set out at Appendices 4 and 5 of the report,
respectively. 
Members asked questions and were provided with further information in relation to
the Care at Home workforce and the intensive recruitment programme. 
The Cabinet agreed to (a) approve (i) the Council Plan Year End Progress Report
and supporting performance measures as set out at Appendices 1, 2 and 3 to the
report, (ii) the Council Plan Annual Performance Report as set out in Appendix 4 to
the report; and (b) note (i) the status of the Council’s performance indicators with the
2020-21 Local Government Benchmarking Framework report set out at Appendix 5
to the report, and (ii) refer the report to the Audit and Scrutiny Committee for further
consideration. 
13. North Ayrshire Health and Social Care Partnership and Alcohol and
Drug Partnership Implementing Medication Assisted Treatment
Improvement Plan 
Submitted a report by the Director (HSCP) on the implementation of new Medical
Assisted Treatment Standards and to endorse the North Ayrshire Medical Assisted
Treatment Standards Improvement Plan. 
8

Page 9

Members asked questions and were provided with further information in relation to: 
• people with lived experience; and 
• the pressures within Primary Care and the impact this may have. 
The Cabinet agreed to (a) endorse the Medical Assisted Treatment Standards
Improvement Plan and (b) note the obligations placed on Chief Officers and Chief
Executives in relation to governance and accountability. 
14. Chief Social Work Officer Annual Report 
Submitted a report by the Director (HSCP) on the Chief Social Work Officer Annual
Report, as required by the Scottish Government’s Guidance.  The Annual Report
was set out in the appendix to the report. 
Members asked a question and were provided with further information in relation to
the health and wellbeing of employees. 
The Cabinet agreed to note (i) the contents of the report and its appendix, and in
particular the successes and challenges contained therein and, (ii) the skilled and
compassionate interventions of practitioners and managers. 
15. Community Investment Fund (CIF) Update 
Submitted a report by the Executive Director (Communities and Education) on
progress in relation to the Community Investment Fund. 
The Cabinet agreed to note the achievements to date in terms of the initiatives
supported by the Community Investment Fund. 
16. Blair Road, Kilwinning (site for former Hazeldene Centre) 
Submitted a report by the Executive Director (Place) on the options appraisal carried
out on potential development options for the vacant site at 1 Blair Road, Kilwinning.  
The Site Plan, Options Appraisal, and Site Considerations were set out at
Appendices 1,2 and 3, respectively, to the report. 
The Cabinet agreed to (a) approve a feasibility study be undertaken to establish the
viability of entering into a partnership to develop an Eco Village on the site, (b)
receive a further update report on the findings of the feasibility study at a future
meeting; and (c) note (i) the details of the options appraisal carried out, and (ii) that
the feasibility study would review potential partnership arrangements, specialist
partner interest, most effective financial model, likely timescales and outcomes that
would be achieved. 
The meeting ended at 4.30 p.m.
9

Page 10

10

Page 11

NORTH AYRSHIRE COUNCIL 
1 November 2022 
Cabinet 
Title:    Proposals for Community Investment Fund (CIF)
Expenditure 
Purpose:  To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects. 
Recommendation:  That Cabinet: 
a) Reviews the enclosed applications from the Garnock Valley,
Irvine, and North Coast and Cumbrae Locality Partnerships in
line with CIF criteria; 
b) Approves the CIF application in relation to Beith Playpark
Action Group (BPAG); 
c) Approves the CIF application in relation to Children 1st; and 
d) Approves the CIF application in relation to the Localities
Priority Officer from North Coast and Cumbrae Locality
Partnership. 
1. Executive Summary 
1.1 Within its budget for 2017-18, North Ayrshire Council provided a funding allocation for
the creation of an innovative fund to enable communities to address the priorities they
have identified though Locality Planning Partnerships and within the context of North
Ayrshire Community Planning Partnership’s Fair for All Strategy and the Council’s
Community Wealth Building Strategy. In June 2021, Cabinet approved a further £1m
top-up for the funding, with a further £2m added in November 2021. 
1.2 Locality Partnerships have subsequently continued to work on their local action plans
and are refining proposals for expenditure in line with their locally identified needs. This
is a difficult process, and it is a testament to the dedication of the Locality Partnerships
and their community partners that proposals are now emerging to provide creative
approaches to addressing local challenges. 
1.3 This report brings forward proposals which respond to the specific need of the local
community, and which have been developed based on local circumstances and
opportunities. 
1.4  These proposals have been approved to be submitted to Cabinet through a process of
collaboration and consensus by the respective Locality Partnerships. 
Agenda Item 3
11

Page 12

2. Background 
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they have
identified though Locality Planning Partnerships and within the context of North Ayrshire
Community Planning Partnership’s Fair for All Strategy and the Council’s Community
Wealth Building Strategy. A further £3m was added to the funding in 2021, to be
distributed among Localities as follows: 
2.2 It was agreed that the CIF awards range between £5,000 and £100,000 for the
community organisations, as defined in the CIF guidance, in order to support
proposals and projects that connect with: 
• The North Ayrshire Fair for All Strategy, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and Locality priorities; 
• North Ayrshire Council’s values, priorities and business objectives;
• The Community Wealth Building and Environmental Sustainability and Climate
Change Strategies; and will also:
• Fulfil a compelling need and not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in
their way of addressing community challenges and in their request to Locality
Partnerships and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
Locality Value of CIF
from first
funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from second
funding
allocation
(June 2021)
Value of
CIF from
third
funding
allocation
(Nov 2021)
Total
balance
available
Irvine £754 000 £464, 604 £290 000 £580 000 £1 159 396
Kilwinning £286 000 £286 190 £120 000 £240 000 £359 810
Three
Towns
£598 000 £616 206  £240 000 £480 000 £701 794 
Garnock
Valley
£390 000 £241 805 £150 000 £300 000 £598 195
North
Coast
£468 000 £380 445 £170 000 £340 000 £597 555
Arran £104 000 £45 226 £30 000 £60 000 £148 774
TOTAL £2 600 000 £1 827 631 £1 000 000 £2 000 000 £3 772 369
12

Page 13

• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
2.3 The proposal development and application process has been agreed as follows: 
• Locality Partnerships should continue to engage with their communities and stimulate
interest in the CIF. Each Locality Partnership will then strategically assess the
applications, make links and look at the funding ‘in the round.’
• If the partnership supports a bid then the group will be encouraged to submit a full
application form, which they will decide upon before making a proposal to Cabinet for
final approval. 
• The proposal will go to the next suitable Cabinet for final approval. 
2.4 The enclosed applications have been developed by community partners and North
Ayrshire Council officers and are now recommended for approval by Cabinet. The
proposals are as follows: 
2.4. The Garnock Valley Locality Partnership 
The Garnock Valley Locality Partnership
CIF allocation
£690 000
Men’s Shed – Project Initiation £ 28 000
Travel Needs Analysis £ 25 000
Geilsland Hall Volunteering and Employability £ 45 000
Beith Community Development Trust YOUth
Lead Project
£ 43 500
Garnock Valley 20:20 Vision £ 15 000
Garnock Valley Men’s Shed – Heating System
Replacement
£ 20 000
Café Solace, Garnock Valley £ 49 723
Geilsland Feasibility Study £ 15 582
Balance £598 195 
Proposal: Beith Playpark Action Group (BPAG) – Skate park renovations, zip wire
and outdoor gym: £100 000 (Appendix 1) 
The proposal is to replace the old skate park ramps with a new concrete state of the art
skate park on the existing site and provide a new zip wire and outdoor gym within Orr’s
Trust Park. At the heart of the project is promoting participation in local park
development. 
BPAG’s lease of the park has recently been extended and they are keen to continue to
deliver high quality play facilities for local youngsters, building on their strong track-
record. Orr’s Trust Park in Beith is central to the town and a key focus point for leisure
and recreation in the community with a pitch, running circle and grass space, as well as
the Group’s existing skate ramps, MUGA and play park. The existing facility is not in
line with today’s wheeled sports facilities and recognises the demand for improved
provision in Beith and the whole Garnock Valley. The benefits of physical activity and
13

Page 14

play have direct, positive impacts on physical and mental health, and the local provision
of free outdoor facilities gives families affordable leisure options. BPAG has plans to
offer skateboard and wheeled sports opportunities as part of the development. 
BPAG has responded to the needs of the community, evidenced through their
consultation exercises, which demonstrated clear community support for extended play
facilities including an outdoor gym and a zip wire in the second phase of the project.
The Feasibility Study shows how local people have been involved in the design of the
play areas and in selecting the type of equipment to meet their needs. Residents local
to the park had the opportunity to feedback their views through the feasibility study
which was widely circulated. 
BPAG has already secured £12,500 funding and has a funding plan to secure the
£150,000 match funding required to finance the full park renovations. The CIF funding
will only be released on condition that the complete funding package is achieved. 
2.4.2 The Irvine Locality Partnership 
The Irvine Locality Partnership CIF
allocation to date
£1 624 000
Digital Officer £     84 604
Vineburgh & Fullarton Community Enablers £   100 000
Irvine Newtown Men’s Shed £     10 000
Harbourside Men’s Shed £     10 000
Irvine Youth Hub £    100 000
Input £      60 000
Irvine Tennis Club £    100 000
Balance £ 1 159 396 
Proposal: Children 1st – Support to Families: £97,580 (Appendix 2) 
Children 1st is a registered charity supporting vulnerable children and families, with a
focus on prevention, protection, recovery and resilience. Children 1st Family Wellbeing
is based in Bourtreehill, Irvine, North Ayrshire and has been established since 2018.
The Family Wellbeing Service is based in the heart of the community, where local
families can discuss what concerns them, seek solutions, access specialist support,
such as money advice and intensive family support for whole families from skilled
people. 
Through their current work across Irvine, engagement at the Irvine Locality Network
Meetings and also via discussions at the Bourtreehill and Broomlands Locality Chit
Chats, local people identified their need for a community-based Family Wellbeing
Worker and a Community and Family Engagement worker. These supports will connect
with and support the local community by offering:
• Practical and emotional trauma informed and recovery focused support to children and
families who have experienced trauma and or adversity in their lives.
• Co-design with the community, a covid recovery plan that will offer a range of community
lead activities that focus on wellbeing, relationships, and hope. These may include
indoor and outdoor creative art activities for whole families, meal preparation, supported
14

Page 15

cooking and smart shopping initiatives. Programmes will include existing partnerships
with local services such as Active Schools, North Ayrshire Rangers and Ayrshire Wildlife
Trust, to maximise opportunities for families to connect with outdoor, recreational
experiences and seek to develop new partnerships with other groups, organisations
and agencies in the area.
• Blended Money Advice support to help whole families establish the root cause of money
worries, maximise their income, help budget and avoid and manage debt, again with a
real trauma sensitive and relationship-based approach.
• Continuous consultation and engagement opportunities within the community, in order
to hear voices, capture feedback on the impact of support offered by Children 1st and
responding to their needs in an agile and creative way. 
As well as engaging with the Community Planning Partnership Forum virtually for
working groups and Chit Chats, the team are working with nearly 500 local families.
Partners include the Irvine Locality and CLD teams, Community Link workers, Service
Access teams, Community Hubs, School hubs, Active Schools, CAMHS, Citrus Energy,
Christians Against Poverty, Police Scotland and the North Ayrshire Rangers, NA HSCP,
Police Scotland, Education, and other key external partners that together will offer an
effective landscape of support for children and families living in the community. 
2.4.3 The North Coast and Cumbraes Locality Partnership 
The North Coast and Cumbrae Locality
Partnership CIF allocation
£978 000
Cycling Without Age- Fairlie £ 22 800
Clearer Minds £ 30 200
Millport Town Hall £200 000
Sing Your Sing £ 14 892
Locality Priorities Worker  £ 35 948
West Kilbride Technical and Creative Training
Programme
£ 76 605
Balance £674 160 
Proposal: North Coast and Cumbrae Locality Partnership – Locality Priorities
Worker – extension of support: £41 871 (Appendix 3) 
After a 2020 CIF application from the North Coast and Cumbrae Locality Partnership
was successful a Community Development Worker has been in post for 1.5 years. The
Locality Partnership met and discussed the need for this post to be extended as it is a
benefit to the North Coast and Cumbraes communities. Given the work that is up and
coming to address poverty, covid recovery and the cost of living crisis, there is a clear
need for a Community Development Worker to continue to build on the delivery of the
Locality Partnership priorities across the North Coast and Cumbraes. 
This post will be dedicated to a distinct range of activities supporting financial inclusion,
mental health and the reduction of social isolation and employability. The post holder
will work with local groups to develop Community Investment Fund applications,
external funding applications and stimulate growth and development of support for
these priorities. 
15

Page 16

Work is underway includes supporting a newly established LGBT Youth Forum, linking
with the Largs Wellness model/the new Aberlour project (including schools, Child and
Adolescent Mental Health Services and other health services), Phase 3 digital literacy
programme – a programme that supported elderly residents in Skelmorlie, supporting
the 5 CIF projects, develop an Elderly Forum in West Kilbride and continue working with
Local food provision services looking to link in with money management services. 
For this specific post and engagement took place with the Locality Partnership,
including community representatives, NAC Locality Officer, Community Link Worker
and Elected Members, as well as with the NAC North Coast & Cumbrae Community
Development staff. Support has been given by the local schools, CAMHS and health
services via the Largs Wellness Model. 
3. Proposals 
3.1 That Cabinet: 
a) Reviews the enclosed applications from the Garnock Valley, Irvine, and North Coast
and Cumbrae Locality Partnerships in line with CIF criteria; 
b) Approves the CIF application in relation to Beith Playpark Action Group (BPAG); 
c) Approves the CIF application in relation to Children 1st; and 
d) Approves the CIF application in relation to the Localities Priority Officer from North
Coast and Cumbrae Locality Partnership. 
4. Implications/Socio-economic Duty
Financial 
4.1 CIF funding is allocated within existing resources. 
Human Resources 
4.2 The Children 1st and North Coast and Cumbrae Locality Partnership proposals will
provide employment opportunities. All of the projects offer skills development
opportunities, which are life-enriching and some of which may lead to employment.
There will also be volunteering opportunities. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community
cohesion and advance community empowerment. Each of the CIF proposals is tested
against that purpose before being presented to Cabinet. All these applications provide
opportunities for increased community support for the cost-of-living crisis through skills
development, digital inclusion, support for food provision, increased volunteering,
community cohesion and wellbeing. The North Coast and Cumbraes Locality
Partnership proposal targets work with young people including LGBT community,
digital inequalities and older people. Children 1st supports families experiencing
trauma, adversity poverty and food insecurity. The investment in the skate park and
16

Page 17

outdoor gym facilities at Beith will provide local free access to physical activity and can
lead to a far wider range of outcomes. 
Environmental and Sustainability 
4.5 Environmental and sustainability issues are considered in relation to each CIF
application. The Beith playpark application will improve local facilities and upgrade the
existing park, encouraging families to become more engaged with outdoor activities.
Partnerships between Children 1st and the Council’s Countryside Ranger Service is also
aimed at encouraging increased outdoor activity for improved wellbeing. 
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
priorities: 
• Active and strong communities
• People enjoy good life-long health and wellbeing. 
Community Wealth Building 
4.7 The applications support the following pillars of community wealth building: 
• Creating volunteering and skills development opportunities; and
• Supporting local third sector businesses. 
5. Consultation 
5.1 The proposals contained within this report have been developed and approved by the
Locality Partnership, through consultation with partners in employability and skills and
local people, including young people. 
Audrey Sutton
Executive Director of Communities and Education 
For further information please contact Rhona Arthur, Head of Connected Communities,
on 01294 324415. 
Background Papers
Appendix 1: CIF Application: Beith Playpark Action Group
Appendix 2: CIF Application: Children 1st
Appendix 3: CIF Application: North Coast and Cumbraes Locality Partnership
17

Page 18

Appendix 1 - Community Investment Fund: Proposal to Cabinet 
Organisation
name
Beith Playpark Action Group 
Brief details
of
organisation
Beith Playpark Action Group (BPAG) are a registered charity (SCO31704)
formed in 2001, which has been in existence for 21 years, and their
charitable objectives are “to promote the benefit of young people of Beith
and surrounding area by associating with the local authorities, voluntary
organisations and inhabitants in a common effort to provide play facilities
in the interest of social welfare for recreation and leisure time occupation
with the object of improving the conditions of life of the said young
people”. 
The Group have previously delivered over £250,000 of investment in play
and outdoor leisure provision on Orr’s Park, and in 2005, the were
presented with The Queen’s Award for Voluntary Service, acknowledging
the many hours of voluntary work put in by the members.
Locality  Garnock Valley
Amount
requested
£100 000 towards a £250,000 development
Brief
overview of
proposal
The proposal is to replace the old skate park ramps with a new concrete
state of the art skate park on the existing site and provide a new zip wire
and outdoor gym within Orr’s Trust Park. The Group has recently
extended BPAG’s lease of the park and has a strong track record in
delivering high quality play facilities for local youngsters. 
The project is proposed for Orr’s Trust Park in Beith, but has benefits for
the whole Garnock Valley. This park is central to the town and a key focus
point for leisure and recreation in the community with a pitch, running
circle and grass space, as well as the Group’s existing skate ramps,
MUGA and play park. The current provision of play and skate ramps
provided and maintained by the Group. The current skate provision in the
park is outdated and the materials used for the ramps and features, and
the surface on the park are not in line with today’s wheeled sports
facilities. Improved provision in Beith will meet local and wider demand. 
Once consultation started it became clear that local people in the Garnock
Valley were also keen to help alleviate financial pressures by offering
access free of charge to new innovative play facilities in a local park. The
physical and mental health benefits of participating in outdoor activities
and play are well known.  By increasing and improving the range of skate
boarding and wheeled sports facilities, the Group will continue to expand
18

Page 19

and develop opportunities for more people to become more active and
healthier.  BPAG plan to offer Come and Try skate boarding events where
more established skaters help young ones to learn the basic skills. 
Partners include Streetscene and Beith Trust who have the lease for the
running track and football pitch at the park. There are plans to create a
park users’ group to ensure all with an interest in the park meet and work
together. Other partners are Connected Communities, Beith Community
Association, Beith Primary School, Active Schools, Beith Juniors Football
Club, Beith Orr Park Neighbourhood Watch, Beith and District Community
Council, Beith Guides and Garnock Valley Ranger Guides, Curves Ladies
Gym, Beith Badminton Club and Garnock Valley Disability Forum. 
A survey ran for 6 weeks with a total of 250 responses. This probably
represented more than 1,000 individuals as some were replying on behalf
of whole families, as well as 13 letters of support. 
A Feasibility Study has been completed and a funding plan has been
developed. Alan Jones Associates have been engaged as an experienced
wheeled sports and play project management company. They have
project managed many different sizes of projects from the £10 million
Inverness Aquadome development down to small community-based
projects.  The Group recognise that the development and installation is
likely to comprise of 2 phases, because of the timing and availability of
other matched funding streams. Phase 1 will see the delivery of the new
skate park and phase 2, which is included in the current funding package,
is the zip wire/play equipment and outdoor gym.   
The Group has identified potential funders for the remaining £150 000 and
BPAG has already received a grant of £10,000 from Awards for All in 2021
for the feasibility study. Two grants, each for £1,000 were received from
the NAC Youth Participatory Budget in 2019 and in 2021. BPAG also
received a grant of £1,500 from Valley Voices in 2021. 
Timescales Spring 2023 
Contact
details
Christina Pieraccini, Locality Officer, Connected Communities
cpieraccini@north-ayrshire.gov.uk 
19

Page 20

Appendix 2 - Community Investment Fund: Proposal to Cabinet 
Organisation
name 
Children 1st 
Brief details
of
organisation
Children 1st is a registered charity (SC015092) providing support for
vulnerable children and families across Scotland. 
Their priorities focus on four key components of prevention, protection,
recovery and resilience. All Children 1st’s services focus on the protection
and prevention of harm and abuse. Staff are skilled in recognising early
signs of concern, sometimes from adverse childhood experience of
physical, emotional or sexual abuse, to prevent escalation of need to
crisis. Their services are configured to address family difficulties and
challenges at an earlier stage thus providing better outcomes for families. 
Children 1st work at a pace that is right for them to support meaningful and
sustainable recovery. 
Children 1st Family Wellbeing is based in Bourtreehill, Irvine, North
Ayrshire and has been established since 2018. 
Families in North Ayrshire are working hard to raise and provide for their
children. However, unfortunately, families are still living in increasingly
isolated and disconnected communities with high levels of unemployment
and poor health, both physical and mental. Due to this, families are under
huge pressure, with not enough money to meet basic needs, and
consequently daily life has become about survival. 
The Family Wellbeing Service, based in the heart of the Bourtreehill
community, is staffed by skilled people who know the local area and offers
a ‘one-stop shop’ of support to children and families living in the
community. 
Locality  Irvine  
Amount
requested
£97,580
Brief
overview of
proposal
Through the Locality Chit Chats and in the Bourtreehill and Broomlands
Virtual working group, local people identified their need for a community-
based Family Wellbeing Worker and a Community and Family
Engagement worker who will together connect with and support the
community of Bourtreehill and Broomlands by offering: 
20

Page 21

• Practical and emotional trauma informed and recovery focused
support to children and families who have experienced trauma and or
adversity in their lives.
• Co-design with the community a covid recovery plan that will offer a
range of community lead activities that focus on wellbeing, relationships,
and hope. These may include indoor and outdoor creative art activities for
whole families, meal preparation, supported cooking and smart shopping
initiatives. Programmes will include existing partnerships with local
services such as Active Schools, North Ayrshire Rangers and Ayrshire
Wildlife Trust, to maximise opportunities for families to connect with
outdoor, recreational experiences and seek to develop new partnerships
with other groups, organisations and agencies in the area.
• Blended Money Advice support to help whole families establish the
root cause of money worries, maximise their income, help budget and
avoid and manage debt, again with a real trauma sensitive and
relationship-based approach.
• Continuous consultation and engagement opportunities within the
community, in order to hear voices, capture feedback on the impact of
support offered by Children 1st and responding to their needs in an agile
and creative way. 
Children 1st took the time to engage and connect with local children,
young people and their families in order to capture their thoughts and
views on what they felt they needed from Children 1st. They learned that
early support is needed for whole families and that families are given the
time to engage and connect with support that is based on trust and
confidence – “this means no timescales”. Children and families are often
more likely to engage with third sector partners and need accessible
support, that is local and/or community based.  This helps to promote
access to “early help” and to prevent complex risk for children, young
people, and their families. 
In the last 21 months the Family Wellbeing Hub has received referrals at a
higher rate than ever before, with more local self-referrals being made by
families themselves, at this time they are providing intensive whole family
support to 46 families in the Irvine area including Bourtreehill and
Broomlands. The wider work engages with around 500 families. 
The proposed programme includes:
• Trauma informed and recovery focused whole family support,
inclusive of one-to-one sessions if required for children, young
people or parents/ carers
• Relational and recovery focused blended family support and money
advice.
• Social Media engagement and support – closed groups like
preschool families and kinship care, as well as Children 1st
Community pages.
• Outdoor whole family pop up play and outdoor learning sessions
• Family music sessions: using music and the support of local
musicians.
21

Page 22

• Creative arts sessions: using the support and expertise of local
artists.
• Wellbeing group for new or expectant parents/ parents of preschool
children.
• Youth groups and Peer Conversation Cafés.
• Community Collaborations to explore and connect with key
partners in statutory services. 
As well as engaging with the Community Planning Partnership Forum
virtually for working groups and Chit Chats, the team are working with
nearly 500 local families. Partners include the Irvine Locality and CLD
teams, Community Link workers, Service Access teams, Community
Hubs, School hubs, Active Schools, CAMHS, Citrus Energy, Christians
Against Poverty, Police Scotland and the North Ayrshire Rangers, NA
HSCP, Police Scotland, Education, and other key external partners that
together will offer an effective landscape of support for children and
families living in the community. 
Timescales Spring 2023 
Contact
details
Elaine Baxter, Locality Officer, Connected Communities
ebaxter@north-ayrshire.gov.uk 
22

Page 23

Appendix 3 - Community Investment Fund: Proposal to Cabinet 
Organisation
name 
North Coast and Cumbrae Locality Partnership 
Brief details
of
organisation
The Locality Planning Partnership is part of the statutory Community
Planning Partnership approach responsible for the delivery of the Local
Outcomes Improvement Plan as set out within the Community
Empowerment (Scotland) Act 2015. 
The North Coast and Cumbrae Locality Partnership provides support for
the communities of the North Coast and Cumbrae to help them do what is
needed to tackle the issues that they have identified as priorities for their
local area. These are outlined in the Locality Plan. 
The partnership meets four times each year and identifies any action
required. They then make sure that it is allocated to the most relevant
Partners to tackle the work. 
The Locality Partnership is made up of 5 local elected members, the
Chairs of the 5 local Community Councils and 4 co-opted Community
Representatives, who have knowledge or expertise in specific areas of the
Locality Partnership’s work (this is known as Participation by Experience). 
Locality  North Coast and Cumbraes
Amount
requested
£41 000
Brief
overview of
proposal
North Coast and Cumbrae Project Officer 
After a 2020 CIF application from the North Coast and Cumbrae Locality
Partnership was successful a Community Development Worker has been
in post for 1.5 years. The original request was to provide capacity to
deliver the Locality Partnership’s priorities and to work across the 5 key
towns and villages. The Community Development Worker supported The
Living Room and responded to local needs like digital skills in Skelmorlie,
establishing an LGBT Youth Forum and engaged with young people in
West Kilbride. Reports were made to each of the Locality Partnership. 
Understanding that the 18 months were nearing completion, the Locality
Partnership met and discussed the need for this post to be extended,
given the clear benefits to the North Coast and Cumbraes communities.
The Locality Partnership also has plans for local support to address
23

Page 24

poverty, covid recovery and the cost of living crisis. There is a clear need
for a Community Development Worker to continue to build on the delivery
of the Locality Partnership priorities across the North Coast and
Cumbraes. 
This post will be dedicated to a distinct range of activities supporting
financial inclusion, mental health and the reduction of social isolation and
employability. The post holder will work with local groups to develop
Community Investment Fund applications, external funding applications
and stimulate growth and development of support for these priorities. 
Work is underway includes supporting a newly established LGBT Youth
Forum, linking with the Largs Wellness model/the new Aberlour project
(including schools, Child and Adolescent Mental Health Services and
other health services), Phase 3 digital literacy programme – a programme
that provided elderly residents in Skelmorlie, supporting the 5 CIF
projects, develop an Elderly Forum in West Kilbride and continue working
with local food provision services, with the aim of creating a community
food larder, and  looking to link in with money management services. 
Other plans include:
• Resuming work with local library to establish a drop-in
employability programme for the local area. 
• Supporting groups though community asset transfer process 
• Continuing to support local community groups complete
Community Investment Fund applications for relevant projects
• Continue working with local young people throughout NC providing
a safe space to develop and gain confidence through carrying out
issue-based inputs preparing young people to become active and
productive adults. 
• Working with NAC Park Rangers to carry out nature walk and talk
groups for local residents to promote positive mental health.
• Facilitating community engagement events, ensuring the
Community Development Worker carries out work in line with
residents needs and wants. 
For this specific post and engagement took place with the Locality
Partnership, including community representatives, NAC Locality Officer,
Community Link Worker and Elected Members, as well as with the NAC
North Coast & Cumbrae Community Development staff. Support has been
given by the local schools, CAMHS and health services via the Largs
Wellness Model.   
The funding will support a Grade 9 Community Development Officer 21
hours per week. Please note that this will be a new appointment as the
previous post holder has secured a permanent Grade 9 post within the
North Coast and Cumbraes Locality Team. 
Timescales Autumn 2022 
24

Page 25

Contact
details
Louise Riddex, Locality Officer, Connected Communities
lriddex@north-ayrshire.gov.uk 
25

Page 26

26

Page 27

NORTH AYRSHIRE COUNCIL 
1 November 2022 
Cabinet
Title: Update on Humanitarian Protection for People from Ukraine
Purpose: To provide Cabinet with an update on the range of supports
being offered by the Council and its community planning partners
to those people seeking sanctuary from the conflict in Ukraine
Recommendation: That Cabinet: 
(i) notes the support provided to date to Ukrainian Displaced
People (UDPs) who have settled in North Ayrshire
(ii) notes the plans to reinstate 30 decommissioned one-
bedroom Council properties at Glebe Place, Saltcoats as
temporary accommodation for Ukranian Displaced People,
using funding of £0.486m allocated by Scottish
Government for this purpose
(iii) agrees that officers continue to investigate further options
to accommodate people displaced by the Ukraine conflict 
1. Executive Summary 
1.1 North Ayrshire Council is fully committed to supporting the UK’s humanitarian
programmes. 
1.2 Since 2015 the Council and its CPP partners have supported 173 refugee and
displaced person households (518 people) to settle in North Ayrshire across the
various resettlement schemes, with work ongoing to accommodate further people
across the active programmes. 
1.3 Following the Russian invasion of Ukraine on 24 February 2022, the Council has
worked closely with Scottish Government, COSLA and other local authorities to provide
support and accommodation to Ukrainian people fleeing the conflict, with 100
households (235 people) accommodated in homes across North Ayrshire at 30
September 2022. 
1.4 This report provides an update on the accommodation and supports already in place,
along with plans to provide further accommodation using grant funding of £486k
available from the Scottish Government for this purpose. 
2. Background 
2.1 North Ayrshire Council is fully committed to supporting the UK’s humanitarian
programmes. This is illustrated by our participation in the UK Resettlement Scheme
(UKRS), the Afghan Citizens Resettlement Scheme (ACRS), the Afghanistan
Agenda Item 4
27

Page 28

Relocation and Assistance Policy (ARAP), the National Transfer Scheme (NTS) for
unaccompanied asylum-seeking children (UASC), Homes for Ukraine (HFU) and the
Scottish Super Sponsorship Scheme (SSSS) to accommodate displaced people from
Ukraine. 
2.2 Since 2015 the Council and its CPP partners have supported 173 refugee and
displaced person households (518 people) to settle in North Ayrshire across the
various resettlement schemes (see table 1).   
Table 1 – Refugees and Displaced People Settling in North Ayrshire at 4 October 2022 
Resettlement Schemes Since
2015
No of
Households
No of
Individuals
Syrian/UK Resettlement
Resettlement Scheme
(Council & RSL housing) 43 211
Afghan Resettlement Schemes 8 36
Ukrainian resettlement - Homes for
Ukraine/ Super Sponsor
Scheme/ family visa 100 235
Ukraine - Welcome Hub (interim
hotel accommodation) 22 36
Total refugee and displaced
persons settled within North
Ayrshire since 2015 173 518 
Update on Humanitarian Protection for People from Ukraine 
2.3 On Thursday 24 February 2022 Russian armed forces invaded Ukraine. COSLA wrote
to all Local Authority Chief Executives on 28 February asking them to provide an
indication of their individual Council’s position with regard to capacity. On 8 March
2022, North Ayrshire Council’s Cabinet agreed: 
• to make a pledge to offer accommodation and sanctuary to people displaced by the
conflict in Ukraine
• that officers should work closely with COSLA to develop plans for providing
assistance
• for practical support to be given to third sector organisations operating in North
Ayrshire who are making plans to offer direct assistance to those displaced by the
conflict.
2.4 Since early March 2022 three key visa routes have been developed for people wishing
to come to Scotland:
• Family sponsor scheme
• UK Government Homes for Ukraine (HfU) Scheme – 3-year visa, with applicants
expected to identify their own individual sponsor/ accommodation
• Scottish Government Scottish Super Sponsor Scheme (SSSS) – no need for
applicants to find their own sponsor/ accommodation. People of Scotland have
28

Page 29

been asked to offer expressions of interest (EOI) to act as hosts; Scottish local
authorities have also been asked to identify accommodation. At its launch the
scheme included an immediate commitment to host a minimum of 3,000 Ukrainian
refugees across Scotland. 
2.5 North Ayrshire Council officers have been working closely with Scottish Government
and COSLA since March, with representation on key groups. Officers have also been
working closely with other councils, particularly through COSLA, SOLACE, ALACHO
and within Ayrshire. 
2.6 Officers from across the Refugee Task Force have been proactive in identifying
suitable accommodation and preparing it for arrival. They are also assisting with
providing initial support and linking in with support services such as GPs, schools,
dentists, welfare benefits, etc. 
2.7 Council officers have been active in carrying out property and disclosure checks for
both HfU and EOI properties/ sponsors, where appropriate. 
2.8 SSSS arrivals were originally being accommodated short-term in a small number of
port of entry hotels (welcome hubs), pending being matched to longer-term
accommodation through the COSLA matching service. Councils across Scotland have
identified longer-term accommodation, but a number of factors have made the national
matching service relatively slow in moving people from hub hotels to longer term
accommodation. In recent months the Council has therefore opted to undertake its own
local matching. 
2.9 The uptake of visas has been significantly higher than the 3,000 originally anticipated,
impacting on Scotland’s ability to provide short and longer-term accommodation. This
has resulted in further welcome hubs being established across Scotland at short notice,
including the use of two large cruise ships docked in Leith and Glasgow and, locally,
the use of 23 bedrooms and meeting space at the Riverside Lodge, Irvine. 
2.10 Due to the high volume of applications being received compared to initial expectations
and the low availability of short- and longer-term accommodation, on 13 July Scottish
Government took the difficult decision to pause new visa applications. Open visas are
still being progressed. 
2.11 Paul Johnston – Director-General Communities wrote to local authorities on 8 August
asking councils to consider their ability to provide the following to assist in meeting
short-and longer-term accommodation need for people arriving in Scotland from
Ukraine in the coming months: 
• unused/ surplus residential stock
• unused/ surplus premises, such as schools and care homes
• serviced sites to accommodate modular accommodation 
2.12 To further manage demand, a rapid review of the Scottish Super Sponsor Scheme has
been undertaken by Scottish Government, with workstreams focusing on:
29

Page 30

• Framework of need and use of the private rented sector
• Matching scheme
• Empowerment
• Direct access to housing stock
• International examples of support 
North Ayrshire response to date: medium- longer-term accommodation 
2.13 North Ayrshire Refugee Task Force, which has representation from across the
Community Planning Partnership, has continued to meet regularly since early March to
respond to the Ukraine crisis. 
2.14 In total, 232 Ukrainians have already been supported to settle in medium-longer term
accommodation, comprising: 
• 158 Ukrainian people (93 adults and 65 children) successfully settled in 62 longer-
term furnished tenancies (56 NAC and 6 RSL) 
• 65 Ukrainians being hosted locally by 29 HfU sponsors
• 9 Ukrainians having been successfully matched with 6 EOI hosts 
2.15 A further three families are known to be living in North Ayrshire under the Family
Sponsor Scheme. 
2.16 In addition to the 62 social rented properties outlined at para 2.14 above, a further 18
houses (8 NAC and 10 RSL) have been identified and will be ready for matching to
families from Ukraine in the coming weeks, increasing the total to social rented 80
properties. 
2.17 Based on current and planned accommodation, it is likely that the number of Ukrainian
displaced people living in medium- longer-term accommodation in North Ayrshire will
be approximately 270 by the end of December 2022. 
2.18 Although this is a very significant achievement in the timescale and when comparing
North Ayrshire’s Scottish population share of 2.5% against the Scottish Government’s
initial 3,000 UDP commitment, it should be noted that, due to the exceptional number
of Ukrainian visas applied for, it represents approximately 1.5% of the number of
people who have already arrived in Scotland, before considering the number of people
with live visas who may still decide to travel here. 
Welcome hubs 
2.19 Due to the significant number of people arriving through the initial ports of entry and the
pressure placed on the welcome hubs there, in late June Scottish Government took the
decision to book 15 hotel rooms at the Riverside Lodge, Irvine, with the first 13
Ukrainians arriving there on 7 July 2022. 
2.20 North Ayrshire Council responded immediately, with staff initially based in the hotel
8am-8pm Monday to Sunday and overnight out of hours arrangements put in place.
30

Page 31

Following the development of robust systems and processes, the on-site staff presence
was reduced to 8am-6pm in September. 
2.21 Following discussions between Council officers, Scottish Government and the
Riverside Lodge’s management team and in recognition of the experience gained by
Council and hotel staff over the last three months and the national demand for
accommodation, Scottish Government recently extended the number and duration of
its hotel booking, with 23 rooms now booked until March 2023. 
2.22 The Council has already successfully rehoused 60 people from Riverside Lodge to
longer-term accommodation in North Ayrshire properties, local RSL stock and in other
local authority areas. 
Impact of ongoing crisis in Ukraine and projected arrivals 
2.23 There are significant concerns across local government regarding the national capacity
to respond to both the short- and medium- long-term response to the Ukraine crisis,
with pressures on accommodation and support services close to crisis point. 
2.24 Should the total number of Ukrainian arrivals in Scotland rise to, say, 26,000 and the
Council seeks to accommodate its 2.46% population share of the national scheme, this
would mean supporting a total of 640 Ukrainians in the area in the coming months.
Assuming an average household composition of 2.4 people, North Ayrshire’s total
number of properties required would rise to 266, mainly comprising social rented
properties, (NAC and its RSL partners) but with support through HfU, EOI and use of
the private rented sector. This means an extra c.151 properties would be required in
addition to the current 115 households, and based on the current demographic, 148
Council houses in total compared to the current 64 already identified. North Ayrshire’s
current Ukraine accommodation represents approximately 5.8% of annual housing
allocations. The foregoing analysis indicates this could rise to 13.5% if no other
housing solutions are identified. 
2.25 It is imperative that the Council maintains and protects its statutory homelessness
duties, therefore mainstream allocations would be most affected if a further 84 Council
houses are required as medium- long-term housing for Ukraine. 
2.26 In addition to the local accommodation pressures arising from the Ukraine crisis, a
report to the Council’s Cabinet in December 2022 will provide details of a UK-wide
scheme which will require 9,000 asylum seekers to be accommodated in Scotland, with
an estimated 111 asylum seekers likely to come to North Ayrshire. Although the
intention is that they will mainly be housed in private rented sector accommodation, the
full impact on the housing sector is yet to be understood. 
Way forward 
2.27 Officers are continuing to work closely with the Scottish Government, COSLA and other
Ayrshire councils to identify options to increase the supply of short-, medium- and
longer-term accommodation to host arrivals from Ukraine.
31

Page 32

2.28 The five blocks of six one-bedroom, low demand flats at Glebe Place, Saltcoats were
identified as a Council housing regeneration project in the Estate Based Regeneration
Plan January 2019 The 30 flats were scheduled for demolition following the successful
rehousing of tenants to alternative accommodation, with the vacated site to be
redeveloped through the Strategic Housing Investment Plan in 2024-25. 
2.29 Following an assessment of the properties and discussions with Scottish Government,
these 30 units were proposed to the Scottish Government as an opportunity to
accommodate Ukrainian individuals/ couples for a period of up to three years, subject
to the full cost of reinstating the properties to the appropriate housing standard being
funded by Scottish Government. The demolition/ redevelopment project could then be
reprofiled within the SHIP to 2026/27, therefore maintaining the overall SHIP
commitment of 1,625 new units by 31 March 2027. 
2.30 Following clarifications being submitted on the project works, costs and timescales and
a site visit taking place, Scottish Government formally confirmed their support for the
project on 30 September 2022, with the total estimated reinstatement costs of £0.486m
to be funded as the first project from a new £50m national fund established for this
purpose. 
2.31 The project works will be undertaken by the Council’s Building Services team, with the
works due to commence on site in mid-late October and be completed by the end of
January 2023. 
2.32 Officers are currently pursuing further options for increasing the number of properties
available to accommodate Ukrainian people, without adversely affecting existing North
Ayrshire housing applicants. Options currently being explored include: 
• Temporary reinstatement of surplus hostel and residential accommodation
• Identification of serviced sites to accommodate modular accommodation 
3. Proposals
3.1 That Cabinet: 
i. notes the support provided to date to Ukrainian Displaced People (UDPs) who
have settled in North Ayrshire
ii. notes the plans to reinstate 30 decommissioned one-bedroom Council properties at
Glebe Place, Saltcoats as temporary accommodation for Ukranian Displaced
People, using funding of £0.486m allocated by Scottish Government for this
purpose
iii. agrees that officers continue to investigate further options to accommodate people
displaced by the Ukraine conflict 
4. Implications/Socio-economic Duty
Financial
4.1 Funding is available from both the UK and Scottish Government to assist local
32

Page 33

authorities in providing accommodation and support services to people fleeing Ukraine.
This includes support for housing costs, translation services and support to access
English language classes. COSLA continue to work with the UK and Scottish
Governments to develop clear eligibility criteria for different workstreams within these
funds. The capital costs relating to the reinstatement of Glebe Place, Saltcoats will be
met from a new £50m Scottish Government fund established to increase the supply of
longer-term accommodation. 
Human Resources 
4.2 Support for individuals and families is being provided by the Services who make up
the North Ayrshire Refugee Task Force. Each Service is currently reviewing their
resources and several new posts have been created to respond to the increased scale
and pace across each of the refugee and humanitarian schemes. 
Legal 
4.3 None 
Equality/Socio-economic 
4.4 Many of the refugees and displaced people who have settled within North Ayrshire
have arrived with a variety of skills and attributes which enrich our communities, and,
in a local context, this may help to address some of the demographic challenges
within North Ayrshire. 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 Supporting refugees and displaced people to resettle within North Ayrshire will
contribute to achieving the Council Plan priorities of ‘Active and strong communities’
and People and communities are safe’. 
Community Wealth Building 
4.7 Many of those who settle in North Ayrshire as part of the national resettlement schemes
are well educated, able to speak English, and able to positively contribute to their new
communities. 
5. Consultation 
5.1 The members of the Syrian Refugee Task Force have been consulted regarding the
contents of this report. Members represent a wide number of internal and external
services including Housing and Public Protection, Finance and Corporate Support,
Education and Communities, Health & Social Care Partnership, Economic
Development & Regeneration, Police Scotland, Department for Work & Pensions,
Primary Care NHS Ayrshire & Arran, The Ayrshire Community Trust, Ayrshire College. 
33

Page 34

RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Yvonne Baulk, Head of Service (Housing and
Public Protection) on 01294 324542.
Background Papers
0
34

Page 35

NORTH AYRSHIRE COUNCIL 
1 November 2022 
Cabinet 
Title:    Strathclyde Partnership for Transport – Regional Transport
Strategy consultation 
Purpose:  To seek approval for the proposed North Ayrshire Council
submission to Strathclyde Partnership for Transport’s
consultation on the new Regional Transport Strategy. 
Recommendation:  That Cabinet approves the submission of the proposed
consultation response the new Regional Transport Strategy
provided at Appendix One. 
1. Executive Summary 
1.1 The Regional Transport Partnership, Strathclyde Partnership for Transport (SPT), has
launched a consultation on the new Regional Transport Strategy for the West of
Scotland 2022-2037. They are seeking views until 28 October 2022. This report seeks
approval for the proposed response to the consultation as provided at Appendix One. 
2. Background 
2.1 The Regional Transport Strategy (RTS) is the long-term strategy for transport in the
West of Scotland. It sets the vision and direction for transport in the region and will
inform SPT’s Capital Investment Programme for the next 15 to 20 years. 
2.2 The existing RTS was published in 2018 and a three-year delivery plan was
developed for 2018/19 to 2020/21. The preparation of the new RTS was delayed by
Covid-19. SPT published the updated RTS draft for consultation in August 2022. This
consultation closes on 28 October 2022. Permission has been obtained from SPT to
submit the North Ayrshire Council response following Cabinet approval in November
2022. 
2.3 The vision for the updated RTS is: The west of Scotland will be an attractive, resilient
and well-connected place with active, liveable communities and accessible, vibrant
centres facilitated by high quality, sustainable and low carbon transport shaped by the
needs of all. 
2.4 Three priorities have been established for the RTS. These aim to ensure that it is
aligned to the wider policy environment and will help to achieve improved
environmental, societal and economic outcomes for all. These priorities are: 
Agenda Item 5
35

Page 36

‒ A healthier environment, supported by a transport system that helps our region
become a low carbon place with healthier natural and built environments for the
benefit of all;
‒ Inclusive economic growth, underpinned by a transport system that supports
regional economic development and growth, with better opportunities and fairer
outcomes for all; and
‒ Improved quality of life, supported by a transport system that helps everyone to
have better health and wellbeing and lead active, fulfilling lives. 
2.5 The RTS sets out policies under the following ten themes: 
1) Accessing and using transport 
2) Reducing the need to travel and managing demand for car travel 
3) Enabling walking, wheeling and cycling 
4) Enhancing quality and integration of public transport 
5) Improving road safety 
6) Decarbonising vehicles and improving air quality 
7) Moving goods more sustainably 
8) Increasing resilience and adapting to climate change 
9) Protecting and enhancing natural and built environments 
10) Connecting Places 
2.6 The proposed RTS priorities, targets, objectives are broadly in line with the Council’s
policies and ambitions in relation to transport.  Key points from the proposed response
include outlining the: 
• Findings from the Inclusive Growth Diagnostic in relation to transport as a barrier to
inclusive growth and outlining the Council’s Community Wealth Building Strategy
approach.
• Challenges faced by North Ayrshire communities in relation to public transport
including the: affordability of and access to services; contraction of the bus network
and withdrawal of services; ferry resilience and reliability; reliance to access
services and healthcare; integration between transport modes; and limited service
provision within rural areas.
• Significant impact of the cost of living crisis on public transport affordability and
poverty and that of the pandemic on patronage levels and confidence in using the
public transport network.
• Needs of island communities and rural areas and the differences with to urban
settlements, noting that policy and intervention should be reflective of these.
• Council’s support for measures to ensure that public transport fares are affordable,
services, the availability of public transport is maintained and wherever possible
improved and for safety and security in the network.  Noting that these are
paramount to building confidence and patronage in the network and to ensure the
long term sustainability and viability of services.
• Constraints and challenges posed by the current funding arrangements for active
travel and welcoming more regional or local funding models and corresponding
revenue funding to support additional maintenance requirements
• Need for investment in the bus network including mechanisms to support
alternative models including local authority operated services
• Need for further support to explore other operating models for public transport to
ensure that communities are well connected and not disadvantaged due to a lack
of sufficient public transport and services are more resilient to economic change.
36

Page 37

• Council’s position in relation to road pricing, congestion charging and workplace
parking levies. 
2.7 A Delivery Plan will be developed following approval of the final RTS.  Officers will
continue to engage with SPT on the development of this plan. 
3. Proposals 
3.1 That Cabinet approves the submission of the proposed consultation response on the
new Regional Transport Strategy provided at Appendix One. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The new RTS will inform regional transport capital funding and programmes for the
next 10 to 15 years. The annual SPT Capital Programme funds a substantial number
of North Ayrshire transport and active travel projects each year. Without this funding
stream significant additional investment would be required from North Ayrshire
Council or other external funding sources in order to deliver on our transport
commitments and priorities. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The transport policies being promoted within the RTS aim to provide a fit for purpose
and inclusive transport network for the STP area to reduce socio-economic
disadvantage and transport poverty. 
Climate Change and Carbon 
4.5 The RTS aims to support sustainable and active travel and reduce the impact of
transport on our communities. This also includes aims to reduce the volume of traffic
travelling through our towns and to facilitate public transport to support a shift towards
more sustainable travel behaviour. This aligns with the Council’s agreed
Environmental Sustainability and Climate Change Strategy workstreams of: Green
Economy; Transport and Travel; and Sustainable Operations. Furthermore, it aligns
with the Council’s commitment to reduce carbon emissions through our declaration of
a Climate Emergency and will contribute to the ambition to achieve net zero by 2030.   
Key Priorities 
4.6 The delivery and implementation of the RTS will contribute to achieving the Council
Plan outcomes under the Inspiring Places and Aspiring People themes. It will
contribute to the ambitions for: an inclusive, growing and enterprising economy; North
37

Page 38

Ayrshire to be well-connected with effective infrastructure; and for a sustainable,
vibrant, welcoming and attractive environment. 
Community Wealth Building 
4.7 The Inclusive Growth Diagnostic identified transport as a barrier to inclusive growth at
a local level. The provision of a connected transport network including high-quality
opportunities for active travel and public transport for everyday journeys is vital to
local communities and delivering inclusive growth and Community Wealth Building. 
5. Consultation 
5.1 The development of the RTS by SPT has been informed by extensive stakeholder
engagement and public consultation. This has included input from Council Services,
local organisations and businesses. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Claire Fitzsimmons, Active Travel and Transport
Manager, on 01294 315305. 
Background Papers
SPT A Catalyst for Change 2018 – 2021 
38

Page 39

Draft Regional Transport Strategy - consultation 
SPT is consulting on a new draft Regional Transport Strategy (RTS) for the west of Scotland. SPT has a
statutory duty under the Transport (Scotland) Act 2005 to produce an RTS and to keep it under review. 
We welcome your response on the draft RTS as well as the Strategic Environmental Assessment and
Equality Impacts Assessments. You can submit a response to these documents using this questionnaire.
The questionnaire may be returned to rts@spt.co.uk or returned or posted to 131 St. Vincent St, Glasgow
G2 5JF.  Posted materials should be postmarked by 28 October 2022. 
The draft RTS and accompanying background reports are available at: www.spt.co.uk/vision 
If you require assistance with completing the questionnaire, please let us know by using the following
email address: rts@spt.co.uk 
You must be 16 years or older to complete the questionnaire on your own. 
The consultation is open until midnight Friday 28 October 2022. 
Data protection 
This consultation is being carried out by Stantec on behalf of Strathclyde Partnership for
Transport. This activity is being carried out in line with current data protection legislation and
your data will be aggregated and anonymised so you will not be identified in the reporting of
the consultation findings. We will combine the information you provide with that of other
respondents to understand views on the draft RTS and Impacts Assessments. The information
gathered will be used to inform the development of the finalised RTS and may be shared on an
anonymised basis with SPT’s partners to assist with their work. 
You can find out more about SPT’s Data Protection Policy here:
https://www.spt.co.uk/media/orqmg4n0/data-protection-policy.pdf 
Our consultants Stantec, have their own privacy policy which can be found here:
https://www.stantec.com/en/copyright 
39

Page 40

Instructions
The consultation questions are in grey boxes.  Please provide answers in the box/cell below each question. 
An X can be typed/written within the line before the answer choice to indicate the answer, for example:
___X__ Yes
______ No
______ Not sure 
Please complete section 1.  The other sections may be completed as relevant to you or your organisation. 
1. Your details
1.1. What is the name of the organisation/business you are responding on behalf? If you are responding as an
individual, please leave this blank. 
North Ayrshire Council
1.2 What is your name and position within the organisation/business?  Please provide your name only if you are
responding as an individual. 
Not applicable
1.3 What is your email address?  We will only contact you if we need to clarify your answers. You do not need
to leave a contact email to complete the survey. 
transportation@north-ayrshire.gov.uk
1.4 If you are responding as an individual, please indicate where you currently live.   
Not Applicable
1.5 Have you read the draft Regional Transport Strategy?    
Yes 
2. RTS Strategic Framework
2.1
The RTS Strategic Framework, which includes the RTS Priorities, Targets, Objectives and Policies for the new
strategy, is set out in Chapter 6 of the draft RTS document. 
Does the RTS Strategic Framework provide a strong basis for improving transport in the region? 
Yes
2.2 Please provide additional comments on the RTS Strategic Framework in the box below. 
The RTS Priorities, Targets, Objectives and Policies are broadly in line with North Ayrshire Council’s policies
and ambitions in relation to transport. 
The North Ayrshire Inclusive Growth Diagnostic was a joint piece of work between the Office of the Chief
Economic Adviser at the Scottish Government and North Ayrshire Council (NAC) in 2017. This aimed to
assess what is holding back long-term sustainable inclusivity and growth. This exercise was extended across
Ayrshire during 2018. The diagnostic results provide evidence of the main constraints to Inclusive Growth
and produced a prioritised list of constraints to address. This identified transport as a barrier to inclusive
40

Page 41

growth. In particular, it was identified as a limiting factor to and preventing people from accessing
employment and training opportunities. Several contributing factors were identified including the:
frequency of transport; connections between transport modes; cost; and shift patterns exacerbating
transport constraints. 
41

Page 42

RTS Policies
The RTS policies are set out in Chapter 7 of the draft RTS document, grouped within ten policy themes. The RTS
policies will guide detailed decision making and investment on specific transport plans, projects and programmes.
They provide the public and stakeholders with a clear view on how SPT will make decisions on transport.
In this section of the survey, we will ask you about the importance of each policy theme to you or your organisation.
You will then have an opportunity to respond to questions on the individual policies within each policy theme.
You can skip to the next policy theme if you do not wish to comment on individual policies.
You can also use the links below to skip to relevant policy themes.
• Accessing and Using Transport
• Reducing the need to travel and managing demand for car travel
• Enabling walking, wheeling and cycling
• Enhancing quality and integration of public transport
• Improving road safety
• Decarbonising vehicles and improving air quality
• Moving goods more sustainably
• Increasing resilience and adapting to climate change
• Protecting and enhancing natural and built environments
• Connecting Places
RTS Policy Theme: Accessing and Using Transport
3.1A How important is the policy theme ‘Accessing and Using Transport’ to you or your organisation? 
Very important
3.1B
Do you wish to comment on the individual policies within ‘Accessing and Using Transport’ theme? 
If you select ‘no’, please move to Question 3.6A. 
Yes
3.2A
Policy: P.A1 Accessible transport 
Ensure the transport system is accessible to all. Support delivery of the Scottish Accessible Travel
Framework (SATF) and Annual Delivery Plans within the region. Improve the
convenience, comfort and certainty of experience for people when travelling by active travel or public
transport, particularly people who have a disability including non-visible disability. Ensure accessibility is
considered in the application of the sustainable travel hierarchy and is a core objective in transport
innovations and new forms of transport services and infrastructure including Electric Vehicle charging 
infrastructure. 
Do you support policy P.A1 Accessible transport?   
Yes
42

Page 43

3.2B. Please provide comments on policy P.A1 Accessible transport in the box below. 
North Ayrshire Council is supportive of this policy.  The proposals contribute to our ambitions in relation to
accessible transport and accords with our Local Transport Strategy (LTS) and Electric Vehicle Strategy.  Our
transport vision is to provide an integrated transport network for North Ayrshire that supports long term,
sustainable, economic growth in the area, and reduces inequality through improving the accessibility and
connectivity of communities to employment opportunities and local amenities. We are currently reviewing
our LTS, which will incorporate our Active Travel Strategy.  It is envisaged that the updated LTS will
continue to support accessible transport and where possible improve on this. 
3.3A Policy: P.A2 Affordable transport 
Promote and facilitate public transport to be more affordable particularly for people living in poverty, in
socio disadvantaged communities and in rural and remote areas. Ensure public transport passengers find it
easy to choose and access the best value ticket for their journey. Facilitate public transport ticketing to be
more flexible, affordable and integrated and to better reflect the way people need to travel, particularly
people who have insecure, part time or shift work or unpaid care work. Ensure affordability is a core
objective in developments and enhancements related to smart and integrated ticketing, Mobility as a
Service and other relevant transport innovations. Develop and facilitate the role of active travel as an
affordable transport option. 
Do you support policy P.A2 Affordable transport?    
Yes
3.3B Please provide comments on policy P.A2 Affordable transport in the box below.  
North Ayrshire Council is supportive of this policy and the commitment to improve the affordability of the
transport network.  We have several projects underway and planned for the future which align with this
policy.  These are informed by the North Ayrshire Inclusive Growth Diagnostic referenced in Section 2.2 of
our response, which identified that: 
‒ The need to commute significant distances to higher value/paid jobs can compound challenges of
transport and childcare.
‒ Transport issues arise more in terms of affordability, especially for people that need to commute to
different areas (e.g., to Glasgow) for work and that are employed in low paid/skilled jobs, than in
terms of physical infrastructure.
‒ Increasing services/ transport linkages may have negative environmental effects. While this may have
the potential of improving mobility/accessibility (improved social cohesion – e.g., reduced sense of
isolation for more remote areas). 
The current cost of living crisis will further exacerbate the challenges faced by our communities in relation
to transport affordability and poverty.  Any rise in cost of transport is likely to result in a reduction in
journeys for education, work or leisure purposes.  Public transport operators may experience increased
operational costs at a time of reduced patronage, resulting in lower revenue and reductions in the
commercial viability of services. This will impact on communities, inclusive economic growth and the
commercial viability of public transport services.  We are therefore supportive of measures to ensure that
public transport fares are affordable to ensure that North Ayrshire residents can access services,
employment, training and leisure opportunities. 
43

Page 44

3.4A Policy: P.A3 Availability of Transport 
Ensure a minimum level of active travel and public transport coverage for all areas in the region to key
locations, particularly town centres, employment centres, colleges and universities, hospitals and key
sustainable transport hubs/interchanges, and aim for enhanced transport coverage where possible. Ensure
transport networks reflect the needs of all communities, particularly groups and communities who
are more likely to depend upon active travel or public transport for every day travel including women and
single parent households, disabled people, young people, older people, lower income households, people
who cannot drive and/or do not have access to a private car, and black and minority ethnic people.
Improve the availability and stability of public transport services in rural, remote and island communities
and socio-economically disadvantaged communities. Develop the role of local bus, Community Transport,
taxis and other Demand Responsive Transport services, shared transport and shared mobility to ensure
public transport is available to all communities. 
Do you support policy P.A3 Availability of Transport?    
Yes
3.4B Please provide comments on policy P.A3 Availability of Transport in the box below.  
North Ayrshire Council is supportive of this policy.  We are experiencing substantial bus service reductions
under the current operating model for the provision of bus services.  As these services are run on a
commercial basis by private operators, the Council has limited scope in influencing their delivery. 
Whilst SPT supports socially necessary bus services where there is no provision by commercial bus
operators, we appreciate that funds are limited and the need to carefully consider the number of
passengers who are likely to use a service, the cost per passenger carried and whether there are other
public transport options available before deciding whether they can subsidise a service. 
The Inclusive Growth Diagnostic identified transport as a barrier to inclusive growth at a local level. The
provision of high-quality opportunities for public transport for everyday journeys is therefore vital to our
communities and economy.   
The Council is cognisant of the challenges faced by commercial operators and in delivering subsidised
services.  These include reduced patronage, increased operational costs, driver shortages and recruitment
difficulties.  We are supportive of initiatives to incentive travel by public transport and rebuild confidence
in the network and will seek to work with SPT and local operators to deliver these locally.  This will require
innovative approaches with action being prioritised on those routes which are the least commercially
advantageous. 
Furthermore, the Council is committed to working with operators to help address driver shortages by
investing in Fair Work and widening access to training and employment across the sector.  A reciprocal
commitment from private operators to work in the best interest of local communities that they serve
would be welcomed and is critical to the recovery of the network.   
We are supportive of the commitment to ensure our communities and especially rural communities and
aging population, who are often more reliant on road-based transport with fewer public transport services
and lower accessibility levels, are not disadvantaged. Improving the availability of public transport is
critical across North Ayrshire and particularly to rural and island communities. 
44

Page 45

3.5A Policy: P.A4 Safety and Security of Public Transport 
Increase personal safety and security of people using and accessing public transport services. Ensure
everyone is able to use public transport services free from fear of harassment and discrimination based
upon ethnicity, disability, sex, sexual orientation, gender identity or age. Promote safety by design and
involve equality groups in the design process. Improve perceptions of personal safety and security of public
transport services. 
Do you support policy P.A4 Safety and Security of Public Transport?  
Yes
3.5B Please provide comments on policy P.A4 Safety and Security of Public Transport in the box below.  
A specific policy on safety and security is welcomed by North Ayrshire Council and we are keen to work
with SPT to deliver on this priority locally. Safety and security are paramount for public confidence.  This is
particularly the case for public transport whereby people will need to feel safe waiting for and using public
transport to support patronage to return to pre-pandemic levels. Current patronage levels are
substantially lower and unlikely to return without intervention. This action is  critical to rebuilding
confidence in public transport to support the viability of services and the longer-term sustainability of the
network. 
We have a safety objective within our current Local Transport Strategy to enhance the safety and security
of all transport network users and a corresponding action to work operators to achieve this.   It is
envisaged that the updated LTS will continue to support and where possible improve on this.  
45

Page 46

RTS Policy Theme: Reducing the need to travel and managing demand for car travel
3.6A How important is the policy theme ‘Reducing the need to travel and managing demand for car travel’ to
you or your organisation? 
Very important 
3.6B
Do you wish to comment on the individual policies within ‘Reducing the need to travel and managing
demand for car travel’ theme? 
If you select ‘no’, please move to Question 3.16A. 
Yes
3.7A
Policy: P.R1 Integration of transport and land use 
Seek to minimise physical separation and travel distances between the places where people live and the
places where people need to go to for work and other everyday activities. Embed the sustainable travel
hierarchy and sustainable transport investment hierarchy as key principles in land use policy and
development plans and strategies. Support new development that is located in areas that are accessible
by active travel and public transport, designed to facilitate movement by walking, wheeling, cycling and
public transport, and integrated with existing and planned active travel and public transport networks,
services and hubs. 
Do you support policy P.R1 Integration of transport and land use?   
Yes 
3.7B Please provide comments on policy P.R1 Integration of transport and land use in the box below. 
North Ayrshire Council is supportive of the policy and the integration of transport and land use in general.
It is however noted that more remote and rural locations within North Ayrshire may require or benefit
from development but have limited public transport provision. We believe the policy should support this
and are keen to engage with SPT and operators to investigate how public transport can be improved to
such locations and developments within North Ayrshire. Active travel links are an essential aspect of any
new developments. This will be reflected within the current review of the Street Design Guide being
undertaken by the Council.
.8A Policy P.R2: 20-minute neighbourhoods 
Support and facilitate development of 20-minute neighbourhoods including developing improved active
travel, public transport and sustainable mobility hubs. 
Do you support policy P.R2: 20-minute neighbourhoods?   
Yes 
46

Page 47

3.8B Please provide comments on policy P.R2: 20-minute neighbourhoods in the box below.  
North Ayrshire Council is supportive of 20-minute neighbourhoods. This will be reflected in our review of
the Street Design Guide and Local Transport Strategy.  We are currently developing Place Frameworks
and supporting of Place Plans for some of our communities which are seeking to start this process by
identifying local priorities for the short, medium and long term. Over the past number of years there has
been a desire to centralise services. For 20-minute neighbourhoods to become a reality there will require
to be a commitment from funding partners and the Scottish Government to assist in enabling this to
come to fruition.
3.9A Policy P.R3: Flexible working and remote access to services 
Reduce the need to travel by supporting development of digital & remote access to public services and
flexible working models. 
Do you support policy P.R3: Flexible working and remote access to services?   
Yes 
3.9B Please provide comments on policy P.R3: Flexible working and remote access to services in the box
below.  
We are supportive of the policy to reduce the need to travel however this should not be to the detriment
of those who have limited digital access and/or have no alternative but to access services and
employment in person.  
3.10A Policy P.R4: Road space reallocation 
Encourage and support reallocation of road space to active travel and public transport where possible to
increase and enhance capacity for active travel and public transport and tackle car-centric road systems. 
Do you support policy P.R4: Road space reallocation? 
Yes 
3.10B Please provide comments on policy P.R4: Road space reallocation in the box below.  
North Ayrshire Council is supportive of this policy in order to encourage more travel by active travel and
public transport. We have several projects ongoing where this is being considered, for example the
reallocation of road space to provide bus lanes and cycle lanes.  It should however be noted that,
particularly in rural areas, access by car for many journeys is essential and these measures should be
applied proportionately. 
47

Page 48

3.11A Policy P.R5: Car demand management – parking 
Encourage and support development of local parking policies that encourage more sustainable travel
behaviours, in line with the sustainable travel hierarchy. Investigate and develop pricing strategies for
park and ride provision to encourage sustainable travel to bus, rail or Subway stations/hubs, where
appropriate. 
Do you support policy P.R5: Car demand management – parking?    
Yes 
3.11B Please provide comments on policy P.R5: Car demand management – parking in the box below.  
North Ayrshire Council is supportive of this policy and recognises that management of car parking
demand is essential to improving conditions within the town centre. This accords with our Town Centre
Parking Strategy.  We are currently in the process of introducing measures to better manage parking and
illegal parking in the area. We are awaiting the outcome of our Decriminalised Parking Enforcement
application. We would welcome support from the Regional Transport Authority to assist us in promoting
and extending any scheme introduced.
3.12A Policy P.R6: Car demand management – pricing 
Support the investigation, development and implementation of road and parking pricing policies that
encourage more sustainable travel behaviours and provide opportunities to fund active travel and public
transport, in line with the sustainable travel hierarchy, and contribute to the development of the national
Car Demand Management Framework. Support development of a Workplace Parking Licensing scheme in
Glasgow and other towns in the region as appropriate. 
Do you support policy P.R6: Car demand management – pricing?    
Not Sure 
3.12B Please provide comments on policy P.R6: Car demand management – pricing in the box below.  
North Ayrshire Council would require to consider any proposals for car demand management before the
level of support for this policy can be established. Given our geographic location and rural communities, it
is important to recognise that car travel for some journeys is essential and is required in order to achieve
our economic growth aspirations.   
It should be noted that the Council has previously ruled out the implementation of the Workplace Parking
Levy within North Ayrshire.
3.13A Policy P.R7: Behavioural change 
Facilitate a change in behaviours and attitudes towards travelling by car particularly travelling to school
by car where high quality, active travel and public transport alternatives are available. Support Smarter
Choices and promote more sustainable travel behaviours for all journey types including journeys made for
leisure, recreational and tourism purposes. 
Do you support policy P.R7: Behavioural change?    
Yes 
48

Page 49

3.13B Please provide comments on policy P.R7: Behavioural change in the box below. 
North Ayrshire Council is fully supportive of this policy to change travel behaviour which complements
the work which we are already undertaking through The Trinity Active Travel Hub and our Travel Smart
programme.
3.14A Policy P.R8: Shared transport and shared journeys 
Facilitate and support improved and increased shared transport provision in the region. Support a shift in
car ownership behaviours from private ownership to shared transport. Facilitate and support increased
sharing of journeys in the region, aiming to increase car vehicle occupancies for journeys that need to be
made by car. 
Do you support policy P.R8: Shared transport and shared journeys e?    
Yes 
3.14B Please provide comments on policy P.R8: Shared transport and shared journeys in the box below.  
North Ayrshire Council is supportive of this policy and actively promotes car sharing through our Travel
Smart programme. We would welcome further engagement with SPT regarding shared transport more
generally and how it could be improved and promoted within North Ayrshire and more regionally. 
49

Page 50

RTS Policy Theme: Enabling walking, wheeling and cycling
3.15A How important is the policy theme ‘Enabling walking, wheeling and cycling’ to you or your organisation?  
Very important 
3.15B Do you wish to comment on the individual policies within ‘Enabling walking, wheeling and cycling’
theme? 
If you select ‘no’, please move to question 3.22A  
Yes
3.16A Policy: P.AT1 Regional Active Travel Network 
Facilitate walking, wheeling and cycling to be the natural choice for every day, shorter journeys in line
with the Sustainable Travel Hierarchy. Aim to make travelling actively more attractive than travelling by
car as much as possible. Ensure active travel networks are convenient, safe, accessible, inclusive and
promote good health and wellbeing, aiming for full segregation from motorised traffic as much as
possible. Develop active travel as a mass transit mode on high travel demand corridors and support
development of Active Freeways. Develop active travel networks in built up areas to include both direct
routes and green networks as much as possible to provide choice and maximise opportunities for healthy
and sustainable travel behaviours. Facilitate development and delivery of a regional active travel network
to achieve excellent active travel connectivity in the region and ensure integration with other sustainable
transport modes including bus, rail, ferry, Subway and Clyde Metro. 
Do you support policy P.AT1 Regional Active Travel Network?    
Yes 
3.16B Please provide comments on policy P.AT1 Regional Active Travel Network in the box below.  
North Ayrshire Council is supportive of this policy and the development of a Regional Active Travel
Network. This would not only help further our strategic active travel network within North Ayrshire but
would also help with the delivery of cross-boundary links. We would welcome further discussion with SPT
regarding the delivery of this.
3.17A Policy: P.AT2 Accelerated delivery of walking, wheeling and cycling infrastructure and facilities 
Enable accelerated delivery of new and enhanced walking, wheeling and cycling infrastructure and
facilities to achieve a step change in active travel provision as soon as possible. Facilitate and support
delivery of Scotland’s Active Travel Framework in the region. 
Do you support policy P.AT2 Accelerated delivery of walking, wheeling and cycling infrastructure and
facilities?  
50

Page 51

Yes 
3.17B Please provide comments on policy P.AT2 Accelerated delivery of walking, wheeling and cycling
infrastructure and facilities in the box below.  
North Ayrshire Council is supportive of this policy and is keen to accelerate the delivery of active travel
infrastructure. A commitment to funding to improve infrastructure links for the active travel network,
including active travel links to key transport hubs, is required to create a resilience within the network.
Funding for the ongoing maintenance of such infrastructure is also critical. Clear and consistent standards
are required for active travel infrastructure delivery across Scotland. These standards should also be able
to be applied appropriately and proportionately to local circumstances. 
We have seen substantial increases in capital funding nationally, however a corresponding increase in
multi-year revenue funding is also required to achieve this policy commitment.  This is required both in
terms of future maintenance funding but also staff resources to deliver these projects. Current single year
funding models make it very difficult for local authorities to attract, recruit and retain staff and to deliver
on these priorities. 
In addition to this, we would welcome increased direct funding awards to local authorities and/or
Regional Transport Partnerships. This would provide local authorities with more resource to deliver local
improvements which perhaps would not be strategic enough to succeed in the existing, over-subscribed
and competitive funding model. 
3.18A Policy: P.AT3 Access to bikes 
Increase access to bikes and enable bike ownership including adapted bikes and other non-standard bikes. 
Do you support policy P.AT3 Access to bikes?    
Yes 
3.18B Please provide comments on policy P.AT3 Access to bikes in the box below.  
North Ayrshire supports this policy and would be keen to understand how this policy would be delivered
on a local and regional basis.
3.19A Policy: P.AT4 Integration of walking, wheeling and cycling with other sustainable transport modes 
Increase and enhance integration of walking, wheeling and cycling networks and facilities with other
sustainable transport modes including bus, rail, ferry, Subway and Clyde Metro. 
Do you support policy P.AT4 Integration of walking, wheeling and cycling with other sustainable
transport modes?    
Yes 
3.19B Please provide comments on policy P.AT4 Integration of walking, wheeling and cycling with other
sustainable transport modes in the box below.
51

Page 52

North Ayrshire supports this policy and would be keen to understand how this policy would be delivered
on a local and regional basis.
3.20A Policy: P.AT5 Integration of micromobility and walking, wheeling and cycling 
Support development of emerging micromobility transport, such as e-scooters, and support the safe
integration into active travel networks. 
Do you support policy P.AT5 Integration of micromobility and walking, wheeling and cycling?    
Yes 
3.20B Please provide comments on policy P.AT5 Integration of micromobility and walking, wheeling and
cycling in the box below.  
North Ayrshire Council is supportive of this policy and the development of micromobility transport.
However, the integration of these forms of transport must not come at the detriment of other active
modes especially for the elderly population who may be less mobile to avoid these forms of travel on the
active travel network. Consideration will also be required regarding the speed of micromobility modes,
such as e-scooters, and the potential for conflict on shared use paths. 
52

Page 53

RTS Policy Theme: Enhancing quality and integration of public transport 
3.21A How important is the policy theme ‘Enhancing quality and integration of public transport’ to you or your
organisation?  
Very important 
3.21B Do you wish to comment on the individual policies within ‘Enhancing quality and integration of public
transport’ theme? 
If you select ‘no’, please move to question 3.34A.  
Yes 
3.22A Policy: P.PT1 Integrated public transport system 
Enhance the quality and integration of the public transport system, aiming for a highly integrated, world
class, passenger focused system that attracts users away from less sustainable modes of travel
particularly private car usage. Promote and facilitate integration of public transport systems including
networks, services, ticketing, information, marketing, and passenger facilities, aiming for a more unified
system that is easy and convenient for passengers to navigate. Improve public transport service quality
particularly reliability, punctuality and frequency. Improve passenger satisfaction including value for
money and increase perceptions of the public transport system as attractive, convenient and desirable.
Facilitate and support integration of public transport with other modes. Ensure public transport
governance models facilitate and enable delivery of the regional transport strategy. 
Do you support policy P.PT1 Integrated public transport system?    
Yes 
3.22B Please provide comments on policy P.PT1 Integrated public transport system in the box below.  
North Ayrshire Council is supportive of this policy and has carried out substantial work on integrating
public transport from improving access to bus stops to working together with SPT to improve Brodick and
Ardrossan ferry terminals. The integration of transport is key to providing a seamless transport system in
the area and supporting modal shift to sustainable travel modes.
53

Page 54

3.23A Policy: P.PT2 Ticketing and information 
Develop and facilitate enhanced integration of public transport systems for ticketing, travel information,
booking and payment activities across all public transport modes in the region including inter-regional
connections where appropriate. Aim for a single, integrated system, providing users with a high quality,
simple and accessible experience for planning, booking and paying for travel on public transport. Integrate
and align developments in ticketing and information with wider developments in Mobility as a Service. 
Do you support policy P.PT2 Ticketing and information?    
Yes
3.23B Please provide comments on policy P.PT2 Ticketing and information in the box below.  
North Ayrshire Council is supportive of this policy and would be keen to work with SPT on its delivery.
Integrated ticketing and MaaS could provide demonstrable benefits to improving the attractiveness of
public transport, reducing car travel and helping to achieve our Net Zero ambitions. We have secured
funding through the UK Government’s Community Renewal Fund to develop and Islands Connectivity
study for Arran and Cumbrae.  This is currently being finalised and aims to pilot MaaS in North Ayrshire. 
We are engaging with SPT as to the next steps. 
3.24A Policy: P.PT3 Mobility as a Service 
Develop and facilitate Mobility as a Service (MaaS) in the region, building upon existing opportunities
including ZoneCard where appropriate. Ensure MaaS platforms are inter-operable with cross-regional and
national MaaS solutions where appropriate. 
Do you support policy Policy: P.PT3 Mobility as a Service?    
Yes
3.24B Please provide comments on policy Policy: P.PT3 Mobility as a Service in the box below.  
North Ayrshire Council is supportive of this policy and is currently developing a MaaS related study for
our islands.  It is vital that all users of transport services have equal opportunities to use the services
provided. 
3.25A Policy: P.PT4 Bus quality and integration 
Facilitate and enable development of an enhanced and fully integrated bus system for the region. Ensure
the bus system provides reliable and punctual services, offers good value for money and high levels of
passenger satisfaction. Ensure bus is perceived to be an attractive, convenient and desirable mode of
transport that attracts users away from less sustainable ways of travelling. Facilitate and support
development of an enhanced regional bus network to ensure excellent bus connectivity for the region and
ensure integration with other sustainable transport modes including rail, ferry, Subway and Clyde Metro.
Support development and delivery of bus priority measures including Bus Partnership Fund. Facilitate
development of bus partnerships, bus franchising and municipal bus operations where appropriate. 
Do you support policy P.PT4 Bus quality and integration?  
54

Page 55

Yes
3.25B Please provide comments on P.PT4 Bus quality and integration in the box below.  
North Ayrshire Council is supportive of this policy and is keen to assist where possible with the integration
of public transport and improved bus quality. A large proportion of residents in North Ayrshire rely on
public transport to access services within and outwith the area. Integration is key to providing a seamless
transport system. North Ayrshire Council is supportive of this policy and would be keen to discuss further
with SPT. 
Regarding the new provisions included within the Transport (Scotland) Act 2019, the existing
arrangements for the provision of bus services is not working in many areas, particularly in North
Ayrshire.  Currently these services are run on a commercial basis by private operators and, as such, the
Council has limited scope in influencing their delivery. SPT supports socially necessary bus services where
there is no provision, by commercial bus operators. Funds however are limited and therefore we
appreciate the need to carefully consider the number of passengers who are likely to use a service, the
cost per passenger carried and whether or not there are other public transport options available before
deciding whether they can subsidise a service. 
The Inclusive Growth Diagnostic identified transport as a barrier to inclusive growth at a local level. The
provision of high-quality opportunities for public transport for everyday journeys is vital to local
communities and delivering inclusive growth and Community Wealth Building. 
North Ayrshire is keen to explore other operating models to ensure that our communities are well
connected and not disadvantaged due to a lack of sufficient public transport. We have also declared a
Climate Emergency and do not wish to see a rise in private car ownership and vehicle kilometres due to
the public transport network not meeting the needs of our communities. 
Some initial discussions have taken place between the three Ayrshire authorities and SPT to discuss
options for establishing a Bus Services Improvement Partnership. We are keen for these discussions to
progress and for alternative operating models to be explored as appropriate. 
3.26A Policy: P.PT5 Rail quality and integration 
Facilitate and support development of the regional rail network in the region and ensure the multi-faceted
role of rail in the region is recognised by investment decision makers. Ensure the rail system provides
reliable and punctual services, offers good value for money and high levels of passenger satisfaction.
Increase integration of the rail system with other sustainable transport modes including bus, ferry,
Subway and Clyde Metro. 
Do you support policy P.PT5 Rail quality and integration?    
Yes
3.26B Please provide comments on policy P.PT5 Rail quality and integration in the box below.  
Whilst North Ayrshire Council has limited powers to manage the rail network, a function carried out by
the Scottish Government, North Ayrshire Council is supportive of this policy.  We would be keen to see a
similar commitment from key stakeholders.
55

Page 56

3.27A Policy: P.PT6 Ferry quality and integration 
Facilitate and support development of the ferry network in the region. Ensure the ferry network provides
reliable and resilient services and meets the needs of island residents, businesses and visitors. Ensure ferry
is integrated with the wider public transport system including island transport services to reduce adverse
impacts of visitor car travel on Island communities and help achieve modal shift to sustainable travel
methods. 
Do you support policy P.PT6 Ferry quality and integration?    
Yes
3.27B Please provide comments on policy P.PT6 Ferry quality and integration in the box below.  
North Ayrshire Council is supportive of this policy and would expect a similar commitment from other key
stakeholders.  Our islands need reliable services that provide for everyday journeys for rural
communities, tourism, leisure and business needs. There are no alternative transport modes for journeys
to and from either Arran or Cumbrae therefore vessel and service resilience is critical. Reliable ferry
services are critical to the supply chain between mainland and island businesses and the sustainability of
island businesses going forward. 
Like most island economies, our islands’ economies are highly dependent on their ferries. The levels of
cancellations and their coverage undermines visitor and business confidence in our islands as places to
either visit, work, live or invest. Service needs and levels fluctuate throughout the year due to seasonal
demand. Ferry services should be suitably dynamic to respond to these fluctuations as far as practical.  
Without the commitment and investment from the Scottish Government to improve the ferry services to
the islands - especially the ageing fleet with limited replacement ferries should issues occur - then
reliability and resilience will be difficult to achieve. 
Due to labour shortages many island businesses are reliant on commuters from North Ayrshire and
further afield therefore a reliable year round service is critical to island business operation. Our health
and social care services rely on the service to transport staff. Significant ferry disruption causes
humanitarian and welfare concerns and stress for the people receiving this support and for the staff
providing these services. 
Road Equivalent Tariff (RET) has led to substantial increases in vehicles on the islands and the lack of
integration between the ferry and bus services further exacerbates this.  Despite increases in ferry
passenger numbers there has been no corresponding increase in bus patronage.  All bus services on Arran
and some on Cumbrae continue to be subsidised due to a lack of commercial viability.   
There needs to be greater co-ordination between all transport modes including connecting modes on
islands and on the mainland. On both Arran and Cumbrae, bus services are largely timed to meet the
ferry on arrival. Reliability issues with the ferry can therefore have a significant knock-on impact for the
wider transport network. If the buses wait for late running ferries the timetable is not met which impacts
the buses serving the wider communities on the islands. On Arran these bus services are also critical to
school transport. The impact of unreliable ferry services therefore disrupts residents, school pupils and
tourists. Furthermore, residents and visitors disembarking the ferry at Ardrossan are being
inconvenienced by relying on rail travel which is similarly synchronised with expected ferry arrival times. 
3.28A Policy: P.PT7 Subway quality and integration 
Develop the Subway to be fully integrated with active travel, bus, rail and Clyde Metro. Ensure the Subway
provides reliable and punctual services, offers good value for money and high levels of passenger
satisfaction. 
Do you support policy P.PT7 Subway quality and integration?  
56

Page 57

Yes 
3.28B Please provide comments on policy P.PT7 Subway quality and integration in the box below.  
No comments
3.29A Policy: P.PT8 Clyde Metro 
Facilitate and support development and delivery of Clyde Metro and ensure integration with active travel,
bus, rail and Subway networks. Ensure Clyde Metro provides reliable and punctual services, offers good
value for money and high levels of passenger satisfaction. 
Do you support policy P.PT8 Clyde Metro?    
n/a
3.29B Please provide comments on policy P.PT8 Clyde Metro in the box below.  
n/a
3.30A Policy: P.PT9 Community Transport, Demand Responsive Transport, Taxis and last mile connections 
Increase and enhance the ‘last mile’ and community-level transport network. Develop the role and
enhance integration of Community Transport, Demand Responsive Transport and taxis, active travel and
shared transport with bus, rail, ferry, Subway and the future Clyde Metro. Integrate walking, wheeling and
cycling networks and facilities with public transport. 
Do you support policy P.PT9 Community Transport, Demand Responsive Transport, Taxis and last mile
connections?    
Yes
3.30B Please provide comments on policy P.PT9 Community Transport, Demand Responsive Transport, Taxis
and last mile connections in the box below.  
North Ayrshire Council is supportive of this policy as it is essential to achieving a fully integrated transport
network. In respect of Community Transport, whilst this is something we fully support, it is not the
responsibility of local authorities to deliver. We are however committed to supporting community
organisations and working with SPT as necessary to achieve local delivery of such options.
57

Page 58

3.31A Policy: P.PT10 Park and Ride 
Increase and enhance Park & Ride facilities and Park & Ride systems where local active travel and public
transport connections to stops/hubs/stations are limited. 
Do you support policy P.PT10 Park and Ride?    
Yes
3.31B Please provide comments on policy P.PT10 Park and Ride in the box below.  
North Ayrshire Council is supportive of this policy and is keen to encourage the reduction of whole
journeys being covered by car therefore the introduction, improvement or expansion of the park and ride
availability will encourage more users to travel part of their journey at least only by car. It is recognised
that within North Ayrshire some residents have no alternative but to commute part of and sometimes
make all of their journey by car.
3.32A Policy: P.PT11 Sustainable mobility hubs 
Facilitate and support development and enhancement of public transport interchanges and sustainable
mobility hubs. Support development of national Mobility Hub Delivery Framework and ensure
development of a sustainable mobility hub network is integrated with development of 20-minute
neighbourhoods. Ensure that best use is made of existing facilities and integration with all sustainable
modes including active and shared modes and Community Transport is assured. 
Do you support policy P.PT11 Sustainable mobility hubs?    
Yes 
3.32B Please provide comments on policy P.PT11 Sustainable mobility hubs in the box below.  
North Ayrshire is supportive of this policy. 
58

Page 59

RTS Policy Theme: Improving road safety
3.33A How important is the policy theme ‘Improving road safety’ to you or your organisation?  
Very important
3.33B Do you wish to comment on the individual policies within ‘Improving road safety’ theme? 
If you select ‘no’, please move to question 3.38A  
Yes 
3.34A Policy: P.RS1 Road safety and vulnerable road users 
Support and facilitate delivery of Scotland’s Vision Zero where no is killed or seriously injured on roads by
2045. Support implementation of the Road Safety Framework and local Road Safety Plans and help meet
road casualty reduction targets in the region. Aim for a sharp and consistent reduction in the
number and severity of road traffic collisions in the region with particular focus on vulnerable road users
including people who are walking, wheeling and cycling, children and young people, older people and
disabled people 
Do you support policy P.RS1 Road safety and vulnerable road users?    
Yes 
3.34B Please provide comments on policy P.RS1 Road safety and vulnerable road users in the box below.  
North Ayrshire Council is supportive of this policy and Scotland’s Vision Zero policy.  This accords with our
Road Safety Strategy.
3.35A Policy: P.RS2 Safe speeds 
Support implementation of 20mph speed limits on a majority of roads in built up areas in the region
including towns and villages. Support investigation and implementation of reduced speeds on rural roads
in the region, where appropriate. 
Do you support policy P.RS2 Safe speeds?    
Yes 
59

Page 60

3.35B Please provide comments on policy P.RS2 Safe speeds in the box below.  
North Ayrshire Council is supportive of this policy and is currently undertaking a Road Assessment with
respect to 20 mph speed limits and zones as part of the Scottish Governments National Strategy for 20
mph.
3.36A Policy: P.RS3 Regional Road network safety measures 
Support implementation of road safety measures on the regional road network. 
Do you support policy P.RS3 Regional Road network safety measures?    
Yes 
3.36B Please provide comments on policy P.RS3 Regional Road network safety measures in the box below.  
North Ayrshire Council is supportive of the policy and the integration of appropriate safety measures on
the regional road network 
60

Page 61

RTS Policy Theme: Decarbonising vehicles and improving air quality
3.37A How important is the policy theme ‘Decarbonising vehicles and improving air quality’ to you or your
organisation?  
Very important 
3.37B Do you wish to comment on the individual policies within Decarbonising vehicles and improving air
quality’ theme? 
If you select ‘no’, please move to question 3.47A.  
Yes 
3.38A Policy: P.GF1 Road transport vehicle decarbonisation 
Facilitate and promote an accelerated transition to ultra-low emission road transport vehicles. Support
and facilitate implementation of electric vehicle charging infrastructure. Support the development of
regional / cross boundary charging infrastructure networks including ensuring supply for rural and remote
areas and integration with public transport and sustainable mobility hubs. Support introduction of tariffs
for use of the electric vehicle charging network and support co-ordinated approaches to tariffs. Improve
information and sharing of best practice related to road transport decarbonisation among consumers,
business, freight sector and transport operators. Support and encourage bus operators to take up
opportunities to decarbonise fleets, upgrade depots and develop partnerships with energy providers.
Support and facilitate decarbonisation of the community transport sector in the region. Facilitate
development of public charging infrastructure for bus and community transport particularly at SPT bus
stations and integrate with sustainable mobility hubs as appropriate. Support and encourage innovation
and investment in alternative fuels and fuelling infrastructure including Green Hydrogen particularly to
support decarbonisation of larger vehicles including buses and public sector fleets. Support alignment of
transport decarbonisation and clean energy strategies and promote cross-sector working including
improving data sharing. 
Do you support policy P.GF1 Road transport vehicle decarbonisation?    
Yes 
3.38B Please provide comments on policy P.GF1 Road transport vehicle decarbonisation in the box below.  
North Ayrshire Council is supportive of this policy and has declared a state of Climate Emergency. This
means we have committed to take action now to reduce carbon emissions across North Ayrshire. We
already have a range of measures in place and ultimately our ambition is to become carbon neutral. This
means there is an equilibrium between our carbon emissions and carbon removal. As transport is one of
the largest emitters of carbon, we would be supportive of any policy that would help in reducing these
emissions dependant on the level of funding received to implement these measures.  This accords with
our Environmental Sustainability and Climate Change Strategy (ESCCS). 
3.39A Policy: P.GF2 Rail decarbonisation 
Support and facilitate decarbonisation of rail services in the region. Ensure investment in decarbonisation
of rail services provides opportunities for improved and more resilient rail services and infrastructure in
the region.
61

Page 62

Do you support policy P.GF2 Rail decarbonisation?    
Yes 
3.39B Please provide comments on policy P.GF2 Rail decarbonisation in the box below.  
Rail decarbonisation would be a matter for the Scottish Government however North Ayrshire Council
would welcome this policy to help reduce carbon emissions.
3.40A Policy: P.GF3 Subway decarbonisation 
Develop and implement a net zero carbon strategy for the Subway. 
Do you support policy P.GF3 Subway decarbonisation?    
Yes 
3.40B Please provide comments on policy P.GF3 Subway decarbonisation in the box below.  
Subway decarbonisation would be a matter for the Scottish Government and SPT however North Ayrshire
Council would welcome this policy to help reduce carbon emissions
3.41A  Policy: P.GF4 Ferry decarbonisation 
Support decarbonisation of ferry services in the region and implementation of Island Connectivity Plan.
Ensure ferry decarbonisation provides opportunities for improved and more resilient ferry services and
infrastructure in the region. 
Do you support policy P.GF4 Ferry decarbonisation?     
Yes 
3.41B Please provide comments on policy P.GF4 Ferry decarbonisation in the box below.  
Ferry decarbonisation would be a matter for the Scottish Government however North Ayrshire Council
would welcome this policy to help reduce carbon emissions. 
We would however note that the provision of a reliable and resilient ferry service is critical to our island
communities and their economies. Future procurement should therefore focus on proven technologies to
ensure continuity of service. Whilst we recognise the desire and ambition to look at new technology, this
should not be at the expense of the connectivity of our island communities. Tried and tested technology
and engineering should be used to help ensure that the delivery programme can be achieved.
62

Page 63

3.42A Policy: P.GF5 Aviation decarbonisation 
Support decarbonisation of regional air services particularly lifeline services to Argyll and Bute, Highlands
and Comhairle nan Eilean Siar. Increase low carbon surface transport to Glasgow Airport and Prestwick
Airport. 
Do you support policy P.GF5 Aviation decarbonisation?    
Yes 
3.42B Please provide comments on policy P.GF5 Aviation decarbonisation?  in the box below.  
n/a
3.43A  Policy: P.GF6 Clyde Metro 
Ensure that Clyde Metro is developed on the basis of minimising carbon and other harmful emissions.
Promote lower energy consumption by incorporating renewable energies and zero emission transport
designs as far as possible. 
Do you support policy P.GF6 Clyde Metro?    
Yes 
3.43B Please provide comments on policy P.GF6 Clyde Metro in the box below.  
No comments
3.44A Policy: P.AQ1 Low Emission Zones 
Support implementation and promotion of the Glasgow Low Emission Zone. Support investigation and
implementation of additional Low Emission Zones in the region as appropriate. 
Do you support policy P.AQ1 Low Emission Zones?    
Yes 
63

Page 64

3.44B Please provide comments on policy P.AQ1 Low Emission Zones in the box below.  
North Ayrshire Council does not have any Air Quality Management Areas or plans to implement Low
Emission Zones locally.  We are however fully supportive of policies which seek to improve air quality in
our communities in accordance with our ESCCS.
3.45A Policy: P.AQ2 Air Quality Management Areas 
Support implementation and delivery of transport improvements and measures to improve air quality
within Air Quality Management Areas in the region. Aim to reduce the number of AQMAs in the region. 
Do you support policy P.AQ2 Air Quality Management Areas?    
Yes 
3.45B Please provide comments on policy P.AQ2 Air Quality Management Areas?  in the box below.  
North Ayrshire Council does not have any Air Quality Management Areas however are fully supportive of
policies which seek to improve air quality in our communities. 
64

Page 65

RTS Policy Theme: Moving goods more sustainably
3.46A How important is the policy theme ‘Moving goods more sustainably’ to you or your organisation?  
Very important 
3.46B Do you wish to comment on the individual policies within ‘Moving goods more sustainably’ theme? 
If you select ‘no’, please move to question 3.51A  
Yes 
3.47A Policy: P.MG1 Strategic freight transport 
Facilitate and support strategic freight transport to be more sustainable and energy efficient. Increase
resilience and reliability of strategic road, rail and maritime freight transport. Enable strategic freight
modal shifts, particularly from road to rail and to maritime transport where appropriate. Support and
facilitate best practice and innovation in freight transport in the region. 
Do you support policy P.MG1 Strategic freight transport?    
Yes 
3.47B Please provide comments on policy P.MG1 Strategic freight transport in the box below.  
North Ayrshire Council is fully supportive of this policy.
3.48A Policy: P.MG2 Urban freight and last mile deliveries 
Facilitate and support more sustainable and efficient movement of goods in City/town centres. Reduce
adverse impacts of goods traffic on local roads networks and communities. Facilitate and support
increased freight modal shift and innovation of the 'last mile' delivery to be more sustainable and to
support development of 20-minute neighbourhoods.
Do you support policy P.MG2 Urban freight and last mile deliveries?    
Yes 
65

Page 66

3.48B Please provide comments on policy P.MG2 Urban freight and last mile deliveries in the box below.  
North Ayrshire Council is supportive of this policy and would welcome further engagement with SPT on
how this could be implemented at a local level.
3.49A Policy: P.MG3 Freight hubs and facilities 
Facilitate and support development and enhancement of freight hubs and freight facilities. Support
development of freight consolidation hubs and networks. 
Do you support policy P.MG3 Freight hubs and facilities?    
Yes 
3.49B Please provide comments on policy P.MG3 Freight hubs and facilities in the box below.  
North Ayrshire Council is supportive of this policy. We are not aware of any plans for freight hubs or
facilities within our area but would welcome further discussion with SPT. 
66

Page 67

RTS Policy Theme: Increasing resilience and adapting to climate change
3.50A How important is the policy theme ‘Increasing resilience and adapting to climate change’ to you or your
organisation?  
Very important 
3.50B Do you wish to comment on the individual policies within ‘Increasing resilience and adapting to climate
change’ theme? 
If you select ‘no’, please move to question 3.56A  
Yes 
3.51A Policy: P.RA1 Climate Change Adaptation 
Facilitate and support adaptation of the regional transport system to the impacts and effects of climate
change including regional roads, coastal rail lines, ferry terminals and harbours, Subway, and flooding of
rail, road and path networks. Adapt the transport system to protect the health and wellbeing of transport
system users from climate change impacts including higher temperatures and heat stress. Ensure new
transport investments including Clyde Metro are future proofed for impacts of climate change and a low
carbon future. 
Do you support policy P.RA1 Climate Change Adaptation?    
Yes 
3.51B Please provide comments on policy P.RA1 Climate Change Adaptation in the box below.  
North Ayrshire Council is supportive of policies that aim to reduce the impact of climate change in
accordance with our ESCCS. As a local authority we seek to make effective use of our powers in areas
such as procurement, planning, housing, education and transport to help drive carbon reductions
elsewhere in society in a way which tackles climate change. 
3.52A Policy: P.RA2 Resilience 
Increase resilience of the regional transport system from disruption. Reduce adverse impacts of transport
system disruption on people and business. 
Do you support policy P.RA2 Resilience?    
Yes
67

Page 68

3.52B Please provide comments on policy P.RA2 Resilience in the box below.  
Resilience of the transport infrastructure is crucial in ensuring people have the means of travel to all
services. North Ayrshire is keen to see all transport resilience improved especially in regard to the lifeline
ferry services to our islands and public transport. We agree with this policy and would be supportive of
any measures under this policy.
3.53A Policy: P.RA3 Flood risk management and mitigation 
Support increased integration of transport and flood risk planning. Encourage and develop opportunities
to support flood risk management actions through transport projects and infrastructure, where
appropriate. 
Do you support policy P.RA3 Flood risk management and mitigation?    
Yes 
3.53B Please provide comments on policy P.RA3 Flood risk management and mitigation in the box below.  
North Ayrshire is supportive of this policy however we would suggest the following re-wording to clarify
the policy 
‘Support increased integration of transport policies and/or projects with the objectives and actions
contained within published Flood Risk Management Plans and Local Flood Risk Management Plans.
Encourage and develop opportunities to support flood risk management objectives and actions through
transport projects and infrastructure, where appropriate’. 
68

Page 69

RTS Policy Theme: Protecting and enhancing natural and built environments
3.54A How important is the policy theme ‘Protecting and enhancing natural and built environments’ to you or
your organisation?  
Very important 
3.54B Do you wish to comment on the individual policies within ‘Protecting and enhancing natural and built
environments’ theme? 
If you select ‘no’, please move to question 3.60A  
Yes 
3.55A Policy: P.EV1 Biodiversity and green infrastructure 
Protect and enhance biodiversity where possible. Develop and implement green infrastructure and other
nature-based solutions as part of transport plans and transport projects where appropriate. 
Do you support policy P.EV1 Biodiversity and green infrastructure?    
Yes
3.55B Please provide comments on policy P.EV1 Biodiversity and green infrastructure in the box below.  
North Ayrshire Council is generally supportive of this policy, however there requires to be support from
the Scottish Government to ensure that any infrastructure has the appropriate maintenance funding.
3.56A Policy: P.EV2 Green networks 
Support and facilitate integration of green networks and active travel networks where appropriate
particularly in built up areas. 
Do you support policy P.EV2 Green networks?   
Y
es
69

Page 70

3.56B Please provide comments on policy P.EV2 Green networks in the box below.  
North Ayrshire Council is supportive of this policy however we would note that appropriate capital
funding for delivery and revenue funding would be required to maintain green infrastructure. 
3.57A Policy: P.EV3 Built environment and high-quality places 
Protect and enhance the built environment where possible. Integrate placemaking and public realm plans
and projects with transport plans and projects where appropriate. 
Do you support policy P.EV3 Built environment and high-quality places?    
Yes 
3.57B Please provide comments on policy P.EV3 Built environment and high-quality places in the box below.  
Integration of transport and placemaking is key to all new developments and as such North Ayrshire
Council is supportive of this policy. Place Frameworks are being developed for towns in North Ayrshire
which consider the built environment, public realm and transport integration. 
70

Page 71

RTS Policy Theme: Connecting Places
3.58A How important is the policy theme ‘Connecting Places’ to you or your organisation?  
Very important 
3.58B Do you wish to comment on the individual policies within ‘Connecting Places’ theme? 
If you select ‘no’, please move to question 4.1  
Yes 
3.59A Policy: P.CP1 International connectivity 
Improve, increase and enhance sustainable inter-national connectivity of the region for passenger and
freight transport and ensure the transport system supports a sustainable, inclusive, competitive, resilient
and productive regional economy. The region's international transport gateways and routes to be
maintained, improved or enhanced include: 
• Connections to Glasgow Airport and Prestwick Airport;
• Connections to ports - Ocean Terminal, Hunterston, Ardrossan, Ayr, Troon, King George V Docks,
Inchgreen, and connections to Cairnryan;
• Connections to England – including Glasgow Central station, Motherwell station, West Coast
Mainline, Glasgow and Southwestern line, A76, A71, A72 and M8/M77/M74 and High-Speed Rail
• Connections to road and rail freight facilities – Mossend, Eurocentral, and connections to
Grangemouth. 
Do you support policy P.CP1 International connectivity?    
Yes 
3.59B Please provide comments on policy P.CP1 International connectivity in the box below.  
North Ayrshire Council has identified that the regional road connection between North Ayrshire and the
rest of the country uses a sub-standard strategic route (A737/B714) and as such are keen to improve this
connection. This has been recognised by the UK Government as requiring Levelling Up funding but has
been omitted from both the NTS and the RTS. The policy above mentions several key routes but has
omitted a crucial part of the infrastructure in the region. We would therefore request that the policy
includes the A737/B714 route as a regional priority to better connect North Ayrshire to Glasgow, the
Central Belt and beyond. 
71

Page 72

3.60A Policy: P.CP2 Inter-regional connectivity 
Improve, increase and enhance sustainable inter-regional connectivity of the region for passenger and
freight transport and ensure the transport system enables a sustainable, competitive, resilient and
productive regional economy. The region's inter-regional transport gateways and routes to be
maintained, improved or enhanced include:
• Connectivity to Argyll and Bute, Northwest and Western Isles
• Connectivity to Loch Lomond and Trossachs National Park
• Connectivity to Falkirk, Stirling and the North/Northeast
• Connectivity to Edinburgh, West Lothian and Scottish Borders
• Connectivity to Dumfries and Galloway
• Connectivity of Arran – Argyll and Bute 
Do you support policy P.CP2 Inter-regional connectivity?    
Yes 
3.60B Please provide comments on policy P.CP2 Inter-regional connectivity in the box below.  
There is a need for regional connectivity between regions within the previous Strathclyde area and in
particular the disparity in suitable trunk road connections between the three Ayrshire areas and the
impact this can have on an area’s economy. Both East Ayrshire and South Ayrshire are served by a dualled
trunk road whereas North Ayrshire is served by a sub-standard single carriageway trunk road. Our
understanding is that, with the exception of North Ayrshire Council, all other council areas in the previous
Strathclyde area are served by at least a dualled trunk road. 
The above policy has included several tourist and economic areas but has excluded connectivity to North
Ayrshire itself. This should be included within the policy. The policy also mentions the connectivity to
Argyll and Bute but does not mention within the RTS the need to improve the sub-standard A841 Brodick
to Lochranza route which is of regional importance by connecting two key ferry terminals and also
required to facilitate improvements to bus provision such as low-floor buses.  
3.61A Policy: P.CP3 Intra-regional Connectivity 
Improve, increase and enhance sustainable connectivity of regional strategic economic development and
investment locations and intra-regional travel to work and freight corridors, and ensure the regional
transport system enables sustainable development. Key strategic intra-regional connectivity priorities and
corridors include:
• HMNB Clyde / Faslane, Helensburgh Growth Area and Helensburgh/HMNB Clyde –
Balloch/Dumbarton – Clydebank - Glasgow
• Clyde Mission Clyde Corridor and Glasgow City Region City Deal investment locations
• Ayrshire Growth Deal strategic economic development and investment locations
• Glasgow - all cross-boundary radial corridors to/from Glasgow
• Intra-urban Ayrshire (Kilmarnock/Irvine/Kilwinning/3 towns/Troon/Prestwick/Ayr)
• South Lanarkshire – North Lanarkshire
• East Renfrewshire – Renfrewshire – West Dunbartonshire
• Inverclyde - Renfrewshire
• Ayrshire – Renfrewshire - Glasgow
• North Ayrshire – Inverclyde
• East Dunbartonshire – North Lanarkshire
• East Dunbartonshire – West Dunbartonshire
• Ardrossan – Arran, Largs - Cumbrae and Rosneath
• Peninsula – Greenock 
Do you support policy P.CP3 Intra-regional Connectivity?  
72

Page 73

Yes 
3.61B Please provide comments on policy P.CP3 Intra-regional Connectivity in the box below.  
As per comments in policy 3.60B this policy has excluded the key Brodick to Lochranza lifeline route of
the A841. 
3.62A Policy: P.CP4 Town Centre connectivity and 20-minute neighbourhoods 
Improve, increase and enhance active travel and public transport connectivity of the region's town centres
to support town centre economies and delivery of 20-minute neighbourhoods. 
Do you support policy P.CP4 Town Centre connectivity and 20-minute neighbourhoods?    
Yes 
3.62B Please provide comments on policy P.CP4 Town Centre connectivity and 20-minute neighbourhoods in
the box below.  
North Ayrshire Council is supportive of the policy and 20-minute neighbourhoods. We are currently
developing Place Frameworks for some of our communities which are seeking to start this process by
identifying local priorities for the short, medium and long term. Over the past number of years there has
been a desire to centralise services. For 20-minute neighbourhoods to become a reality, there will require
to be a commitment from funding partners and the Scottish Government to assist in enabling this to
come to fruition. Connectivity between towns is crucial in enabling people to choose sustainable travel
options. 
3.63A Policy: P.CP5 Island, Rural and Remote Area Connectivity 
Improve, increase and enhance transport connectivity for rural, remote and island communities
particularly to nearest town centres and key transport hubs. Improve, increase and enhance transport
connectivity for Arran, Cumbrae and Rosneath peninsula. 
Do you support policy P.CP5 Island, Rural and Remote Area Connectivity?    
Yes 
3.63B Please provide comments on policy P.CP5 Island, Rural and Remote Area Connectivity in the box below.  
Please refer to our response to 3.27B.  North Ayrshire Council are supportive of this policy and would
expect a similar commitment from stakeholders.  Our Island Connectivity study aims to improve
connectivity between transport modes on our islands however its implementation will require funding
and support from partner organisations including SPT.  Connections to ferry terminals also require to be
considered as part of this policy to support sustainable travel to and from our islands and reduce the
impact of RET. 
73

Page 74

It is important to remember that rural connectivity issues are not limited to the islands. We have many
rural areas within North Ayrshire that are suffering from reducing public transport provision and we are
supportive of policies that seek to better connect these communities. 
3.64A Policy: P.CP6 Regional Hospitals and Tertiary Education 
Improve, increase and enhance sustainable connectivity of regional hospitals and tertiary education.
Support development of active travel and public transport connectivity for new Monklands hospital and
other future hospital and tertiary education development. 
Do you support policy P.CP6 Regional Hospitals and Tertiary Education?    
Yes 
3.64B Please provide comments on policy P.CP6 Regional Hospitals and Tertiary Education in the box below.  
The ongoing issues experienced in North Ayrshire in relation to the reliability and resilience of the ferry
network has a considerable effect in relation to our island populations being able to access medical
facilities in particular. 
Our health and social care services also rely on the service to transport staff. The Patient Transfer Service
runs twice daily, specimens are taken to Crosshouse Hospital daily and there also regular deliveries of
vaccines, medications and other equipment. Significant ferry disruption causes humanitarian and welfare
concerns and stress for the people receiving this support and for the staff providing these services. 
The reduction in rural bus services also presents significant issues for people accessing such key services.
We are therefore supportive of this policy but would suggest that wider connectivity is considered to
settlements accessing these services and not just in the immediate vicinity of the facilities. 
3.65A Policy: P.CP7 Housing Development 
Facilitate and support increased and enhanced active travel and public transport connectivity of major
residential development and growth areas in the region. 
Do you support policy P.CP7 Housing Development?    
Yes 
3.65B Please provide comments on policy P.CP7 Housing Development in the box below.  
North Ayrshire is supportive of this policy. We work closely with developers to ensure that new housing
has suitable transport infrastructure. We are also currently updating our Street Development Guide
which will clearly set out our expectations in relation to transport provision for new developments. 
74

Page 75

3. Delivering the strategy: governance
Transport governance relates to issues such as what roles and responsibilities an organisation may have, how it
makes decisions, how it is funded, and how it is held accountable. Respondents to our earlier consultation on the
RTS Case for Change highlighted that they believed a change in transport governance in the west of Scotland was
needed in order to deliver the improvements required. Previous work as part of the National Transport Strategy
Roles and Responsibilities workstream concluded that a workable, regional model was the preferable option for
governance, and further work is continuing as part of Transport Scotland’s Governance and Collaboration review
workstream.
The Transport (Scotland) Act 2019 also contains provisions which, if a case were made and approved, could affect
roles and responsibilities in bus. The Draft RTS commits SPT to having dialogue with, firstly, our council partners and
subsequently other partners to see if an agreed approach to future transport governance in the west of Scotland can
be identified.
4.1 What are your views on transport governance in the west of Scotland? Is the right framework in place to
deliver the vision and objectives of the Draft RTS?  Please provide comments in the box below.  
In general, North Ayrshire is content with the existing governance arrangements for transport with
policies and strategies flowing from national government, Regional Transport Authorities and Local
Authorities. Two key areas of concern are the funding of active travel improvements and the provision of
bus services. 
Regarding active travel funding, we do not feel that the existing competitive funding model managed by
Sustrans provides the best arrangement. Being a largely rural authority with lower population densities
we are at a disadvantage when it comes to securing funding as not all schemes are classed as being
strategic enough. We would welcome further discussion in relation to alternative funding models,
perhaps with consideration being given to allocating more funds either regionally or locally. 
Regarding the new provisions included within the Transport (Scotland) Act 2019, the existing
arrangements for the provision of bus services is not working in many areas, particularly in North
Ayrshire.  Currently these services are run on a commercial basis by private operators and, as such, the
Council has limited scope in influencing their delivery. The Regional Transport Partnership, Strathclyde
Partnership for Transport (SPT), supports socially necessary bus services where there is no provision, by
commercial bus operators. Funds however are limited and therefore we appreciate the need to carefully
consider the number of passengers who are likely to use a service, the cost per passenger carried and
whether there are other public transport options available before deciding whether they can subsidise a
service. 
The Inclusive Growth Diagnostic identified transport as a barrier to inclusive growth at a local level. The
provision of high-quality opportunities for public transport for everyday journeys is vital to local
communities and delivering inclusive growth and Community Wealth Building. 
North Ayrshire is keen to explore other operating models to ensure that our communities are well
connected and not disadvantaged due to a lack of sufficient public transport. North Ayrshire Council
launched Scotland first Community Wealth Building strategy in 2020.  One of the 5 pillars within the
strategy is plural ownership of the economy which advocates for more diverse range of business models
with greater local/community ownership invested in the local economy.  Business models advocated
include cooperative, social enterprise, employee owned and municipalisation.  These models have proved
to be more resilient to economic shocks and consideration of further support to encourage these models
would be welcomed.  We have also declared a Climate Emergency and do not wish to see a rise in private
car ownership and vehicle kilometres due to the public transport network not meeting the needs of our
communities. 
75

Page 76

Some initial discussions have taken place between the three Ayrshire authorities and SPT to discuss
options for establishing a Bus Services Improvement Partnership. We are keen for these discussions to
progress and for alternative operating models to be explored as appropriate. 
4.2 What changes, if any, would you like to see made?  Please provide comments in the box below.  
Please see answer above. 
76

Page 77

4. Delivering the strategy: resources
Resources to deliver what we aspire to achieve, be it capital funding (infrastructure) or revenue funding (operational
services), skills, materials, or staff, is an ongoing and growing challenge for transport in the west of Scotland.
Dialogue undertaken in developing the Draft RTS highlighted concerns from many people and stakeholders that the
current position was unsustainable and needed change.
The Draft RTS commits SPT to further engagement with key partners on the issue of resources and funding in seeking
to address the challenges, including consideration of how we pay for transport in future. 
5.1 What are your views on resources and funding for transport in the west of Scotland? Is the current model
suitable for delivering the aspirations of the Draft RTS?  Please provide comments in the box below.  
Substantial government funding is put into rail, but a similar amount is not provided to help with the
current difficulties in the bus service industry. The government has allowed local authorities to consider
bus services. It is likely the routes that require a local authority service would not be commercially viable
otherwise a commercial service would be operating. The Scottish Government has provided no indication
of how these could be funded. 
The majority of active travel infrastructure improvements is currently funded via Sustrans programmes.
We believe that funding would be better allocated either regionally or locally to ensure that all projects,
regardless of size, have an opportunity to progress. The existing competitive nature of the funding
programme results in many projects being funded through design stages, but then not deemed strategic
enough to secure construction funds. Delays in securing construction funds can often lead to abortive
costs as design works need to be revisited and environmental surveys redone. 
Whilst we are grateful for the increased active travel funding coming from Scottish Government, we
firmly believe that a similar increase in associated revenue funding is also required. Building new active
travel infrastructure is a key priority for us, but it comes with a substantial increased maintenance burden
on the Council. 
Multi-year resource funding is also required for the Council to recruit officers to deliver on these active
travel commitments. The current single year funding model for both CWSR and Smarter Choices Smarter
Places limits our ability to offer more than one year contracts which limits our ability to attract and retain
good staff and to support delivery. 
5.2 What are your views on how we pay for transport in future – from level of fares on public transport,
through to road pricing / congestion charging? What changes, if any, would you like to see made?  Please
provide comments in the box below.  
North Ayrshire Council does not currently intend to consider road price, congestion charging or
workplace parking levys. We are however in the process of introducing car parking charges to enable the
Council to better manage our assets to ensure good turnover of spaces rather than to fund transport
improvements. 
With regard to public transport fares, we would welcome further discussion on this. To create a modal
shift away from the private car, public transport fares need to be set at an affordable level. In a post-
covid world confidence in public transport has been reduced and patronage is low. We therefore need to
ensure that fares are set at a level whereby public transport offers a viable and attractive alternative.
We also have substantial areas of deprivation within North Ayrshire and transport fares should not be a
barrier to people from accessing employment or education opportunities. 
77

Page 78

5. Monitoring and evaluation framework
It is important to monitor and report on progress of the RTS on an on-going and regular basis to understand what is
working well and what areas may need additional focus. A proposed monitoring and evaluation framework is set out
in chapter 9. The framework includes monitoring indicators, which will be reported annually. The framework also
includes a proposal to regularly evaluate progress towards the RTS Targets and RTS Priorities and a commitment to
improve equality data and monitoring.
6.1 Are there any other monitoring indicators that should be included in the Monitoring and Evaluation
Framework?  If No or Not sure, please skip to 6.3.  
No comments
6.2 Please describe these indicators including data sources.  
No comments
6.3 Please provide any other comments on the Monitoring and Evaluation Framework in the box below.  
No comments 
78

Page 79

6. Equality Duties 
7.1 Please provide any comments on the Equalities Duties Report in the box below. 
No comments 
7.2 Please provide any comments on the Public Sector Equality Duty report in the box below.  
No comments
7.3 Please provide any comments on the Island Communities Impact Assessment Report in the box below.  
No comments
7.4 Please provide any comments on the Scotland Duty Assessment Report in the box below.  
No comments
7.5 Please provide any comments on the Child Rights and Wellbeing Duties Assessment Report in the box
below.  
No comments 
7. Strategic Environmental Assessment 
8.1 Please provide any comments on the Strategic Environmental Assessment report in the box below. 
No comments 
79

Page 80

80

Page 81

NORTH AYRSHIRE COUNCIL  
1 November 2022 
Cabinet
Title:
Millport Coastal Flood Protection Scheme: Update 
Purpose: To update Cabinet on the latest position in respect of the award of
contract for the construction of the Millport Coastal Flood
Protection Scheme.
Recommendation: It is proposed that Cabinet:
i. notes the tender position for the Millport Coastal Flood
Protection Scheme. 
ii. notes the importance of the scheme. 
iii. notes the position in respect of the volatility in construction
costs resulting in tender returns significantly exceeding the
budget. 
iv. Approves the use of flexibility funding already included in the
Capital Programme to fund the additional contribution to the
Scheme from North Ayrshire Council of approximately £4m
and Cabinet to note the additional Scottish Government
funding of approximately £17m. 
1. Executive Summary 
1.1 The requirement for a coastal flood protection scheme for Millport was included within
the Ayrshire Local Flood Risk Management Strategy and Plan produced in 2015 and
2016 respectively. Since then, significant work has been undertaken and the design for
the proposed scheme has been completed. 
1.2 Over 600 properties have been identified at risk of flooding and potential flood
damages are estimated to be more than £77m. In extreme events there is also a
danger of risk to life. 
1.3 The preferred design solution is the provision of offshore breakwaters connecting the
small islands in Millport Bay, plus onshore flood walls along the Millport shoreline. The
proposed scheme will not only provide the required flood protection, but it will also
create an area of sheltered water which could allow the future development of a marina
supporting the potential for step ashore facilities under the auspices of the Ayrshire
Growth Deal. 
1.4 An extensive consultation process has been conducted with the local community. On
10 November 2020 Cabinet agreed confirmation of the scheme. 
Agenda Item 6
81

Page 82

1.5 Following confirmation of the scheme the design for the project was finalised and a
tender exercise was conducted in the early part of 2022. Regular ongoing consultation
with the local community has continued throughout the development of the scheme and
has played a significant part in shaping the final design. 
2. Background 
2.1 Funding for agreed flood protection schemes is funded 80% by the Scottish
Government and 20% by North Ayrshire Council. 
2.2 A pre-qualification process for tenders was undertaken in 2021 which resulted in a
tender list of 5 contractors. Tenders were issued in April 2022 to all five tenderers, but
two contractors declined to tender at that point due to other commitments. 
2.3 3 tenders were returned at the end of June 2022 and a tender evaluation process
began and is still being concluded. 
2.4 However, during the tender evaluation process, it became clear that the existing budget
of £27.053m was not adequate to permit a contract for the construction to be awarded
and tender prices significantly exceeded the budget. 
2.5 The Covid crisis created material shortages and uncertainty which caused high inflation
in the construction industry. In addition, the invasion of Ukraine has created further
uncertainty and supply issues which has driven prices even higher. Many projects with
historical cost estimates are now discovering that the allocated budgets are
inadequate. 
2.6 A substantial shortfall has been identified, which is in the region of £21m. However.
that figure may vary slightly due to the allocation of risk between the Client (NAC) and
the contractor. The degree of risk that is assumed by the Client will determine the
contingency that is required to be included in the budget. 
2.7 It is vital that the contingency is determined at this stage because the Scottish
Government settle its contribution to the Scheme at tender award and any Scheme
costs arising after tender award are required to be met in full by North Ayrshire Council. 
2.8 As part of the 2022/23 Budget process, to help address the financial risk to the Council
from the cost volatility in the construction sector, the sum of £10m additional flexibility
was approved in the capital programme. It is therefore recommended that the
additional costs of approximately £4m required from North Ayrshire Council for the
Scheme will be met from this provision. This equates to 20% of the additional funding
required. 
2.9 The Scottish Government have formally indicated their support for the Scheme and
have confirmed they will commit additional funds of approximately £17m, which is 80%
of the extra funding required. 
2.10  It had been planned that work would start in October 2022, but this will no longer be
possible. Based on an award of contract in November 2022, work is expected to begin
on site in February and continue until summer 2024. The offshore breakwaters will be
constructed in Autumn and Winter 2023. 
82

Page 83

2.11 The sheltered water created by the scheme will allow the construction of a marina,
which is an Ayrshire Growth Deal project. The marina proposals are currently being
developed and the intention is that the marina construction will follow on shortly after
the completion of the flood protection scheme. 
2.12 Following a contract award, an update will be provided to the community regarding the
timing of the works. The community will also be given the opportunity to communicate
with the contractor about how the works will be carried out and the impact the works
will have on the community. 
3. Proposals 
3.1  That Cabinet notes the tender position for the Millport Coastal Flood Protection
Scheme. 
3.2  That Cabinet notes the importance of the scheme. 
3.3  That Cabinet notes the position in respect of the volatility in construction costs resulting
in tender returns significantly exceeding the budget. 
3.4  That Cabinet approves the use of flexibility funding already included in the Capital
Programme to fund the additional contribution to the Scheme from North Ayrshire
Council of approximately £4m and Cabinet to note the additional Scottish Government
funding of approximately £17m. 
4. Implications/Socio-economic Duty 
Financial 
4.1 It is anticipated that the total additional costs will be in the region of £21m. The Scottish
Government has formally confirmed that they will continue to support the Scheme and
will provide the additional funding based on their 80% contribution which will be in the
region of £17m. The balance of £4m additional funding (20%) requires to be met from
North Ayrshire Council and this has been identified from existing capital resources set
aside in the form of £10m additional flexibility included in the 22/23 Budget process. 
Human Resources 
4.2 Human resource implications to deliver the scheme have been identified and the cost
will be met from the available budget. 
Legal 
4.3 The Scheme has been developed in accordance with the Flood Risk Management
(Scotland) Act 2009. Scottish Ministers have directed that planning permission for the
development has been deemed to be granted. 
Equality/Socio-economic 
4.4 An Equality Impact Assessment has been carried out during the development of the
Scheme. 
83

Page 84

Climate Change and Carbon 
4.5 Flood risk management forms part of the Council’s Environmental Sustainability and
Climate Change Strategy by supporting the sustainability of our communities. 
Key Priorities 
4.6 Flood mitigation and protection of our communities addresses the Council Plan key
priorities of 'protecting and enhancing the environment for future generations' and
providing ‘sustainable and effective infrastructure’. 
Community Wealth Building 
4.7 A package of community wealth building measures has been incorporated into the
tender and Community Wealth Building measures will be developed and implemented
once a contract has been awarded. 
5. Consultation 
5.1 An extensive consultation process has been carried out and is ongoing. All statutory
consultation requirements have also been met. 
5.2  The Council’s Head of Finance and the Scottish Government have been consulted on,
and have agreed, the allocation of the required additional funding. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Service (Commercial) on
01294 324290. 
Background Papers 0
84

Page 85

NORTH AYRSHIRE COUNCIL 
1 November 2022 
Cabinet
Title: Strategic Housing Investment Plan 2023 – 2028
Purpose: To seek Cabinet approval of the Strategic Housing Investment   
Plan 2023 – 2028 
Recommendation: That Cabinet (i) approves the Strategic Housing Investment Plan
2023-2028 at Appendix 1 for submission to Scottish Government
and (ii) gives delegated authority to the Executive Director
(Place) and the Cabinet Member for Place to liaise directly with
the Scottish Government in agreeing the North Ayrshire
development programme and the rescheduling of projects as
required. 
1. Executive Summary 
1.1 The Strategic Housing Investment Plan (SHIP) 2023 – 2028 sets out the priorities and
locations for affordable housing investment by the Council and Registered Social
Landlords in North Ayrshire over the next five years. The SHIP is based on projected
Scottish Government grant funding provision for the Council and our partner Registered
Social Landlords of £120.855m during the period 2023 – 2028 and represents Council
investment of £84.773m. 
1.2 It is proposed that delegated authority is assigned to the Executive Director (Place), in
consultation with the Cabinet Member for Place, to liaise with the Scottish Government
and agree the rescheduling of projects detailed in the SHIP, as required. Any additional
projects that are not contained within the approved SHIP will require further Cabinet
approval. 
1.3 From a Council perspective, the SHIP reflects the previous commitment to construct
1,625 new build homes, including provision for 275 new homes to replace the Fullarton
tower blocks, which are scheduled for demolition following re-housing of all tenants and
250 new units to support the Council’s Estate Based Regeneration Programme. 
1.4 The Council and its RSL partners have been monitoring the impact of both COVID-19
and ongoing global economic factors impacting supply chains, labour availability and
materials costs affecting the construction industry, on the SHIP. It is clear that both
issues have contributed to time and financial impacts, due to labour and material
shortages and an increase in material costs. The SHIP includes the latest available
estimates of the time and financial impacts of COVID-19 on the development
programme.   
1.5 The SHIP 2023 - 2028 will secure investment in a total of 1,652 properties across the six
North Ayrshire social landlords currently active in housebuilding and will provide
Agenda Item 7
85

Page 86

sustainable, affordable, accessible, and high-quality homes which will contribute to the
wider regeneration aims for the area. This will in turn secure employment and training
opportunities for North Ayrshire businesses and residents and support the Council’s
Community Wealth Building Strategy. Members are invited to approve the SHIP at
Appendix 1 for submission to the Scottish Government, as the Council’s investment plan
for new affordable housing in the area over the next five years. 
2. Background 
2.1 The Strategic Housing Investment Plan (SHIP) 2023 – 2028 sets out the priorities for
affordable housing investment in North Ayrshire over the next five years to support the
outcomes in the Local Housing Strategy. The Plan is prepared in accordance with
Scottish Government guidance and includes details of individual development projects to
be taken forward over its five-year lifespan (see Appendix 1). 
2.2 The plan supports the Council’s historic commitment to develop 1,100 new build Council
homes.  In June 2018, the demolition of the Fullarton tower blocks in Irvine was
approved. The SHIP makes provision for the replacement of all 275 of these homes
within the Irvine locality. 
2.3 In January 2019, the Estate Based Regeneration Programme was approved. To assist
the delivery of this programme, the SHIP includes provision for 200 units as an indicative
replacement for any selective demolition of particularly low demand stock.   
2.4 Programme revisions to date include the addition of a further 50 new units towards the
Estate Based Regeneration Programme, bringing the total to 250. These projects take
the total investment in Council developments to £165.361m during the period 2023 -
2028 and represents Council investment of £84.773m. 
2.5 The Scottish Government has committed to providing North Ayrshire Council with grant
funding for the Council and our RSL partners of £63.005m from April 2022 to March
2026.  The funding levels beyond March 2026 are not currently known and have
therefore been estimated for planning purposes, based on trend assumptions.  The
Scottish Government benchmark grant rates are subject to annual inflation in line with
the Scottish Social Housing Tender Price Index. For new build Council developments
funding levels have been estimated for projects not yet at tender stage at benchmark
rates plus annual inflation which was 8.3% for 2021/22 and has been assumed at 8.6%
for 2022/23 and 3.7% for 2023/24.  The Council will seek grant funding above these
levels in accordance with Scottish Government guidance on a site-by-site basis, as
required. The RSL funding rates have been included as requested by each developing
organisation and will be subject to Scottish Government authorisation.   
2.6 The SHIP is based on total projected Scottish Government grant funding provision of
£120.855m for the Council and our RSL partners during the period 2023 - 2028. In
accordance with Scottish Government guidance, the Council has over committed the
funding within the SHIP by approximately 25% to ensure that the allocation is spent, and
to provide the opportunity for North Ayrshire to absorb slippage from other local authority
areas.  For this reason, a significant portion of the funding is allocated during the second
and third years of the SHIP. 
2.7 The Council and its RSL partners have been monitoring the impact of both COVID-19
and ongoing global economic factors impacting the SHIP. It is clear both have
contributed to time and financial impacts, due to labour and material shortages and an
increase in material costs. The SHIP includes the latest available estimates of the time 86

Page 87

and financial impacts on the development programme. 
2.8 An additional £32.762m is required to support the Council’s developments set out within
the SHIP to offset rising rates of inflation and ensure that the costs associated with the
introduction of new legislation which requires the installation of Zero Direct Emissions
heating systems and Electrical Vehicle Charging Points can be met. The Council is also
enhancing the building fabric for all new homes to reduce the need for heating. This
additional expenditure alongside estimated additional grant of £13.933m, will be
considered within the review of the HRA Business Plan to be presented to Council in
February 2023 as part of the 2023-24 HRA Budget and rent setting. 
2.9  For any projects noted within the SHIP, Cabinet is asked to delegate authority to the
Executive Director (Place), in consultation with the Cabinet Member for Place, to liaise
with the Scottish Government and agree the rescheduling of projects as required.  This is
of particular importance where deliverability is delayed or acceleration is possible due to
emerging challenges or opportunities that require to be addressed. Any additional
projects that are not contained within the SHIP will require Cabinet approval. 
Strategic Priorities 
2.10 The SHIP is based on a series of guiding principles for housing provision, taken from the
Local Housing Strategy. 
2.11  In order to prepare the SHIP, the Council invited site nominations from its partners. No
new sites were nominated for the SHIP 2023 however three RSL partners introduced
buy back programmes. If any project becomes delayed or non-viable, the Council will
work with RSL partners and the Scottish Government to ensure that new homes are
delivered, and the available grant funding spent, by accelerating other projects. 
2.12  In terms of ongoing governance, senior officers monitor the progress of the new build
programme monthly through the SHIP Project Board. 
Demand 
2.13 Demand figures have been obtained from the North Ayrshire Housing Register (NAHR).
House size and type priorities have also been informed by the NAHR. The Housing
Need and Demand Assessment (HNDA) sets the housing estimate for the period 2022-
2027 as 2,330 new units, either in the social rented sector, or, in the case of strong
economic recovery, split across all tenures. Housing supply targets will be set out in the
emerging Local Housing Strategy. 
2.14 Figure 1 plots SHIP completions against net gain from 2022 to 2028. The 'net gain'
columns indicate the additional homes available per locality following completion of the
developments, minus the strategic demolitions set out in the SHIP. 
Figure 1: SHIP Actual & Projected Completions 2022-2028 & Net Gain 2022-2028 
87

Page 88

2.15 The Council allocates funding to each developing organisation from the Scottish
Government Resource Planning Assumption (RPA). Figures 2 and 3 show the proportion
of stock held by each developing organisation, and the share of funding per developing
organisation. 
Figure 2: Proportion of stock held in North Ayrshire per developing organisation (%) 
Figure 3: Proportion of funding per developing organisation (%) 
2.16 An indicative size mix (Table 1) for new developments across North Ayrshire has been
prepared based on North Ayrshire Housing Register (NAHR) intelligence to meet existing
and future housing need. 
NAC, 72%CHA, 13%
Riverside
(IHA), 9%
Cairn (ANCHO), 4% Trust, 2%
Link, 0%Developer
North 
Ayrshire
Stock
NAC 13,135
CHA 2,329
Riverside (IHA) 1,710
Cairn (ANCHO) 657
Trust 287
Link 0
Total 18,118
Developer
Completions 
in SHIP 
2023 - 2028
NAC 988
CHA 485
Riverside (IHA) 122
Cairn (ANCHO) 13
Trust 32
Link 12
Total 1652 NAC, 60%CHA, 29%
Riverside
(IHA), 7%
Cairn
(ANCHO), …
Trust, 2%
Link, 1%
88

Page 89

Table 1: Indicative mix by bedroom size 
No of
Beds
Three
Towns Arran Garnock
Valley
Irvine /
Kilwinning
North
Coast
North
Ayrshire
1 14% 14% 10% 15% 14% 14%
2 60% 54% 56% 56% 63% 57%
3 15% 20% 20% 15% 15% 16%
4+ 11% 12% 14% 14% 8% 13% 
Specialist Accommodation 
2.17 Analysis of the NAHR, and projected future demographic trends signifying an ageing
population, indicate that at least 25% of all new build homes should be designed for
older people (i.e., amenity housing or sheltered housing). 
2.18 Following a review of North Ayrshire’s Housing Allocation Policy in 2019, the age
restriction for the allocation of amenity housing was removed. This allowed allocation of
amenity homes to younger people with an accessible housing requirement, promoting
independent living.  Currently, 79% of applicants for amenity housing are aged over 51. 
The Council will continue to monitor the availability of housing for older people to ensure
that their needs can be addressed through the affordable housing supply programme. 
2.19 In order to promote independent living, the Flatt Road development site in Largs was
used as an exemplar for assistive technology. Features can be included within the
sheltered housing complex and supported accommodation where required to support
tenants’ individual needs. 
2.20 The Council’s Housing Service and Health and Social Care Partnership (HSCP) worked
together over the last five years to consider a model for Extra Care Sheltered Housing. 
The vision was to create safe, affordable homes for tenants who require additional
support with extra services to promote independent living, such as assistance with meals
or welfare checks, to be available for tenants for an additional fee.  Following
development of the outline model, demand analysis was undertaken by the HSCP in
2021 alongside engagement with other areas in Scotland where similar housing models
operate.  At that time, it was determined that there was not sufficient demand to
integrate the model into a new sheltered housing complex and there are challenges in
sustainable funding to operationalise the model.  The Council has, however,
incorporated flexibility into some new build sheltered housing complexes to allow this
model to be reconsidered in future, with minimal investment should the HSCP choose to
develop this further. 
2.21 To ensure need is met now and in the future, the Local Housing Strategy 2018 – 2022
set a target for all tenures, with at least 7% of all new build stock being fully wheelchair
accessible.  This will be reviewed in the next LHS (due for renewal in early 2023) and the
future Local Development Plan following Scottish Government guidance for local
authorities on the setting of targets to support the delivery of more wheelchair accessible
housing. 
2.22 The SHIP will support the Health and Social Care Partnership to meet specialist housing
need through dedicated projects using the jointly developed supported accommodation
model, and as part of a wider site mix on other developments, a further emerging area
being explored is how the SHIP can support those with more complex care needs. The
latest SHIP includes provision for 25 supported accommodation housing units at two
89

Page 90

different locations. 
Child Poverty and Improving Health and Wellbeing 
2.23 North Ayrshire’s Local Child Poverty Action Plan and Report 2020/21 recognises that the
instance of child poverty within North Ayrshire is one of the highest in Scotland and
acknowledges the role that access to good quality and affordable housing has in
combating inequality.  All new build Council family homes have study space and private
gardens. 
2.24 The Council is also considering ways in which young people can access construction
related learning and training opportunities. The North Ayrshire Local Employability
Partnership Delivery Plan 2022 – 2026 sets out the intentions to help people of all ages
to gain skills for employment. It will prepare people for employment, training, education
and/or volunteering, with the aim of increasing qualification levels and job prospects as
well as reducing unemployment. Officers from Housing and PMI will work alongside
Education colleagues to determine how our housebuilding programme can support the
Council’s ambitions to encourage more young people into training and employment. 
Island Development 
2.25 On Arran, the Council’s development of 34 units at Brathwic Terrace, Brodick completed
during June 2022.  In addition, Trust Housing Association is currently in discussions with
a local landowner to develop 26 new homes in Brodick. These developments, alongside
work with communities on the island, are anticipated to support investment to encourage
economic growth. Similarly, 18 new homes have recently been completed on Cumbrae
through the SHIP as part of a second phase of the successful St Beya Gardens site.  It is
hoped that these developments will help to address local housing need, support key
employment and enable people to remain on the islands. Work is ongoing to determine
housing need on Arran at a town / village level, through analysis of the North Ayrshire
Housing Register and further contact with applicants. Consideration is also being given
to commissioning independent research with a particular focus on housing’s role in
supporting the local economy. The outcome of this work will be reported to Cabinet in
due course, alongside any proposed action. 
Buy Backs 
2.26 Bringing empty homes back into use supports regeneration; it is a strategic priority within
the current LHS and will continue to be a priority in the future.  It also supports the
Council’s Regeneration Delivery Plan.  In recognition of this, a target has been set to
purchase at least five second hand or empty properties during each financial year of the
new SHIP, subject to the availability of Scottish Government Grant. 
Sustainability & Safety 
2.27 Council officers are seeking to maximise the incorporation of energy efficiency measures
and renewable technologies within the new build programme. The developments within
the SHIP will benefit from a range of sustainable measures, for example solar
photovoltaic panels, small scale district heating schemes, and passive design measures
to minimise space heating demand. The exact package of measures will be determined
through assessment of opportunities on a site-by-site basis. 
2.28 Following a revision to national Building Standards, all new build social housing
properties with planning applications submitted on or after 1 March 2021 require to be 90

Page 91

fitted with fire suppression systems. In advance of this legislation, and in recognition of
the safety benefits of fire suppression systems, the Council has installed fire suppression
systems in all new build housing proposals which reached technical design stage after
October 2019. 
Regeneration 
2.29 The provision of affordable, modern and well-designed homes that meets residents’
needs is one of nine strategic priorities within the Council Plan 2019 - 2024. 
2.30 The Council, along with its strategic partners, continues to explore the site and area
specific opportunities to secure maximum regeneration benefits, supporting the
ambitions of the Council’s Regeneration Delivery Plan to drive forward development on
strategic regeneration sites, including town centres.  Our town centres continue to be of
strategic importance as the economic and social focus points of North Ayrshire.  The
Council has acquired the former King’s Arms public house in Irvine Town Centre and will
redevelop the site into six amenity flats to address local housing need and encourage
town centre living.  Other town centre projects include: the redevelopment of the former
Largs Police Station and adjacent former St Colm’s Place Sheltered Housing Complex;
the development of the former Springvale depot in Saltcoats; the redevelopment of
former sheltered housing complexes at Afton Court and Caley Court in Stevenston; and
the redevelopment of the Irvine High Flats.  Regeneration Project 1d in Ardrossan and
the unallocated regeneration blocks will also be utilised to further support North Ayrshire
regeneration.   
2.31 The SHIP also includes the provision of funding for 250 units to assist the delivery and
funding of Housing’s Estate Based Regeneration Programme.  Most of this investment
is anticipated to be replacement for any selective demolition of stock.  The regeneration
units included within the SHIP will allow Housing Services to continue the
implementation of the Estate Based Regeneration Programme, as well as support a
review of our assets in relation to our EESSH2 and zero emissions targets to consider
further redevelopment opportunities.   
Community Wealth Building 
2.32 Effective use of community benefit clauses in development contracts, and partnership
work with colleagues in Economic Development to support local construction and supply
chain companies to bid for this work, can secure many of these jobs for our local people
and support the Council’s Community Wealth Building Strategy.  The Council has
undertaken a review of our Dickson Drive, Irvine house building pilot and will utilise this
to inform a second project with Building Services to construct a number of new homes at
Ayrshire Central, Irvine.   
2.33 The Council is also currently developing a pilot model for employability by offering
training and employment opportunities obtained through community benefits from
Housing Services maintenance and investment contracts to our Housing First tenants,
supporting some of our most complex support cases to sustain housing and
employment.  The delivery of the SHIP, alongside investment in land and asset
maintenance, plays a key role in community wealth building. 
Affordability 
2.34 The Council is committed to ensuring rent levels are affordable. Many tenants in social
housing are partly or fully dependent on benefits and are under increasing pressure from 91

Page 92

the impacts of Welfare Reform and rising living costs. The Scottish Housing Regulator
has intimated that social landlords will be expected to keep rent increases to a minimum.
To ensure homes are affordable, the Council and all RSL partners will be expected to set
rent levels on new build homes at or below the Local Housing Allowance.  North Ayrshire
Council has an approved rent structure based on house size and type, with no additional
charge for new build properties. Current rent levels are set below the Local Housing
Allowance. 
Key Achievements from 2021/22 
2.35 During 2021/22, the Council’s largest development to date at Flatt Road, Largs reached
completion providing 123 units including a new sheltered housing complex, supported
accommodation, amenity bungalows, general needs properties and homes suitable for
wheelchair users. The site is serviced by a district heating scheme which provides
heating and hot water to all residents. The redevelopment of Dalrymple Place, Irvine also
completed providing 33 new sheltered and amenity homes. A further 18 units were
completed at the St Beya Gardens, Millport development; 14 new homes were delivered
at Springvale, Saltcoats; 50 units were created at Towerlands, Irvine; and the 34 new
homes at Brathwic Terrace, Arran were all allocated by June 2022. 
2.36 During September 2022 works concluded at the 79-unit St. Michael’s Wynd, Kilwinning
site which delivered supported accommodation, sheltered housing, general needs
properties and accessible housing.  The 29 new homes at the St. Colm’s Place sheltered
housing complex also reached completion during September 2022. The 16 units of
supported accommodation at Caley Court, Steveston are expected to complete during
autumn / winter 2022.  Work continues to develop 71 new homes at Irvine Harbourside
which are expected to complete during early 2023. 
2.37 The contractor has commenced work on site to deliver 12 new amenity flats at the former
Largs Police Station. The completion date for this site has slipped by eight months due
to analysis being undertaken to determine the most cost-effective heating option for
future tenants. At Afton Court, Stevenston works are anticipated to commence on site
during late 2022 to deliver six new amenity bungalows. Now that a contractor has been
appointed, the timeline has been confirmed and this scheme will complete around six
months later than previously anticipated. 
2.38 Cunninghame Housing Association completed 76 units at Sharphill Phase 4 in Saltcoats
and allocated their two new wheelchair accessible homes at Glebe Place.  Work
continues to develop 72 units at West Byrehill, Kilwinning and 24 units at Green Street,
Saltcoats.  Riverside Scotland continue works on site for 77 units at Tarryholme Phase 2,
Irvine which is expected to complete in early 2023. 
2.39 North Ayrshire’s Resource Planning Assumption for the Council and our RSL partners
during 2021/22 was £18.205m.  During the year, a total of £20.641m was claimed,
through obtaining slippage funding of £2.436m from other local authority areas.  North
Ayrshire Council and our RSL partners have been able to claim an additional £19.165m
towards affordable housing in the area from slippage in other local authority areas in the
six years from April 2016 to March 2022.   
2.40 As a result of past success in accelerating projects and claiming additional funding year
upon year to date, and also due to the slippage in some of the projects noted below, it is
unlikely that North Ayrshire will be able to claim our full Resource Planning Assumption
for the 2022/23 financial year. Discussions are ongoing with the Scottish Government to
ensure that grant funding is maximised wherever possible. 92

Page 93

Removal of Projects from the SHIP 2023 - 2028 
2.41 Cunninghame Housing Association’s Confidential sites 9 and 11 have been removed
from the SHIP as they have been assessed as unviable.  A block of 92 units named
‘Unallocated CHA Block’ has been added into the SHIP to provide CHA with capacity for
future development while the association identifies suitable sites. 
2.42 The Council’s ‘Unallocated Regeneration Block 2’ is no longer required as the units have
now been allocated to specific projects within the SHIP where additional capacity was
identified.  
Amendments to the SHIP 
2.43 The following amendments have been made in this update of the SHIP: 
• Following value engineering design work, the James Reid, Saltcoats site can
accommodate 47 units (increased from 44 units), the Stanecastle, Irvine site can
accommodate 31 units (increased from 28 units) and the James McFarlane,
Ardrossan site can accommodate 19 units (increased from 18 units).
• The Ayrshire Central, Irvine site has been increased to 202 units from 171 units. 
• Redevelopment Projects 10, 11b and 14 located in Irvine have now been named as
Montgomerie Park, Irvine and can accommodate 189 units, increased from 168
units.
• The Laburnum Avenue, Beith site can accommodate seven units, increased from
six.
• The Fullarton Street, Irvine site can accommodate 62 units, increased from the 54
units previously anticipated. The estimated project start and completion dates for
this site have been adjusted by a year now that the timeline for the demolition of the
high flats has been established.
• Glebe Place, Saltcoats has been reprofiled from 2024/25 to 2026/27 to enable the
Council in assisting the Scottish Government to meet accommodation needs for
Ukrainian Displaced People.
• Unallocated Regeneration Block 1 has been reduced from 49 units to 30 units; the
other 19 units have been allocated to projects in the SHIP.
• Cairn Housing Association’s Confidential Site 1 has reduced from 20 units to 9
units following site viability assessments.
• Cunninghame Housing Association’s (CHA) Confidential Site 8 has been named as
Garven Road, Stevenston and can accommodate 20 units, increased from 19. 
• CHA’s site at Harbour Road, Irvine has been reduced to 27 units from 29 units.
• Cunninghame Housing Association’s phase 5 site at Sharphill, Saltcoats has been
increased to 100 units from 82 units.  
• Riverside are unable to deliver their development at 111 Bank Street, Irvine.
Cunninghame Housing Association are currently reviewing site viability and this site
has therefore remained within the SHIP.
• Trust Housing Associations Confidential Site 4 can now accommodate 26 units,
increased from 20 units. 
2.44 A number of North Ayrshire Council project timelines have experienced slippage due to
the requirement for redesign and value engineering to offset increasing costs and whilst
studies were undertaken to ensure that the introduction of Zero Direct Emissions heating
and hot water systems provided value for money for tenants. 
93

Page 94

2.45 Some SHIP sites have been anonymised for reasons of commercial sensitivity, or as
they require further work to ensure that they comply with the Council’s Planning or
Roads policies. 
New Council Projects 2023 - 2028 
2.46 The Council has included a three unit refurbishment of a property on Nelson Street in
Largs and a further two unit refurbishment project in Irvine, a viability assessment is
currently underway for this scheme and it has therefore been marked as confidential until
this is complete. 
New RSL Projects 2023 - 2028 
2.47 Cunninghame Housing Association, Riverside Scotland and Trust Housing Association
have included buy back programmes within the new SHIP. 
SHIP Impact on North Ayrshire School Capacity 
2.48 Officers from Housing, Planning and Education will continue to monitor emerging
development to ensure any impact upon school capacity can be addressed or mitigated. 
3. Proposals 
3.1  It is proposed that Cabinet (i) approve the North Ayrshire Strategic Housing Investment
Plan 2023-2028 for submission to the Scottish Government; and (ii) gives delegated
authority to the Executive Director (Place) and the Cabinet Member for Place to liaise
directly with the Scottish Government in agreeing the North Ayrshire development
programme and the rescheduling of projects as required.
94

Page 95

4. Implications/Socio-economic Duty
Financial
4.1 The financial implications arising from the projects included within the SHIP 2023 - 2028
have been assessed by each of the developing organisations, ensuring that the
programme is fully deliverable within the timescales set out.  The current HRA Business
Plan includes a budget of £165.361m to deliver the North Ayrshire Council development
projects set out within the SHIP, inclusive of Scottish Government funding. It is
estimated that an additional £32.762m is required to support the Council’s developments
set out within the SHIP 2023-2028 to offset rising rates of inflation and ensure that the
costs associated with the introduction of new legislation which requires the installation of
Zero Direct Emissions heating systems and Electrical Vehicle Charging Points can be
met. The Council is also enhancing the building fabric for all new homes to reduce the
need for heating. This additional expenditure alongside estimated additional grant of
£13.944m, will be considered within the current review of the HRA Business Plan prior to
it being presented to Council in February 2023 as part of the 2023-24 HRA Budget and
rent setting. 
Human Resources 
4.2 Council projects within the Strategic Housing Investment Plan will be delivered by
North Ayrshire Council staffing and complemented by external expertise, where
required. 
Legal 
4.3 The Town & Country Planning (General Permitted Development) (Scotland) Order
1992, Schedule 1, Part 12, Class 33, as amended, enables local authorities to carry
out works, within their district, for the erection of dwellings so long as the development
conforms with the Local Development Plan. The Council’s House Building Protocol
governs the design and consultation processes for such development to ensure that
appropriate levels of design scrutiny and consultation are maintained.  In 2019, it was
agreed that all future Council housing developments progressed as permitted
development will be required to obtain a ‘Certificate of Lawfulness’ from the Council’s
Planning Service. This will certify that each site within the SHIP has been considered
against the full terms of the adopted Local Development Plan. Housing development
proposals by the Council which do not fall within the scope of permitted development,
including schemes which require an Environmental Impact Assessment (EIA) will
require planning permission. Proposals over 0.5 hectares in area will require to be
screened for the purposes of EIA. 
Equality/Socio-economic 
4.4 The provision of new social housing will have a positive impact on those who require
specialist accommodation, older people, those who are homeless, or at risk of
homelessness, and those for whom purchasing a home is not an affordable option.
The benefits of new build housing in relation to health, wellbeing and educational
attainment, are well documented.  New housing will also support our island
communities and their economies. 
Climate Change and Carbon 
4.5 New homes should have a low environmental impact, with the aim of reducing fuel
use and associated fuel costs. All projects within the SHIP will be delivered in
accordance with Building Standards regulations for energy efficiency. In addition, the
95

Page 96

majority of the new projects incorporated into the plan will meet the Scottish
Government’s ‘Greener Standard’. Innovative approaches to fuel efficient
development will be considered on a site-by-site basis (e.g., Passivhaus design
measures, biomass boilers, solar photovoltaic panels, smart technologies etc). New
Council homes contribute significantly to the Council’s Sustainability agenda.  New
housing is more energy efficient, better ventilated, and has higher levels of thermal
comfort, which supports improved health and well-being. 
Key Priorities 
4.6 The provision of new affordable housing supports the Council Plan priority to provide
affordable, modern and well-designed homes that meet residents’ needs.  It supports
the ambitions of the Council’s Regeneration Delivery Plan to drive forward
development on strategic regeneration sites, including town centres.  There is also
evidence that children and young people can benefit from improved cognitive
development and a reduction in behavioural issues through living in a more attractive,
warmer, and better ventilated environment and the provision of new affordable
housing also supports the Council Plan priority that children and young people
experience the best start in life.  New housing will also support our island communities
and their economies. 
Community Wealth Building 
4.7 The Council’s contractors are required to participate in the Council’s Community
Benefits Programme.  The projects within the SHIP aim to deliver new employment
opportunities for the area, including the provision of dedicated apprentice starts,
graduate positions and the creation of local jobs. The project contractors also engage
with local schools to provide health and safety presentations, undertake STEM
activities, provide mock interviews, and host design competitions. 
5. Consultation 
5.1 The Council has taken a collaborative approach to the preparation of the SHIP, and
the following stakeholders have been involved in the process: 
• ANCHO in partnership with Cairn
• Cunninghame Housing Association
• Riverside (formerly Irvine Housing Association)
• Link Group Ltd
• Trust Housing Association
• The Scottish Government
• North Ayrshire Council Officers (Economic Growth, Education, Finance, Housing,
Planning, Property Management and Investment, Active Travel & Transport, Roads,
and the Health and Social Care Partnership). 
5.2 Regular meetings are held with developing organisations, the Council and the Scottish
Government as part of the SHIP governance process. The meetings will continue to
be convened on a quarterly basis each year, to ensure that partners’ requirements are
identified, and the development programme delivered. 
96

Page 97

RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Fiona Ellis, Senior Manager, Housing Strategy and
Development, on 01294 324031. 
Background Papers
0
97

Page 98

North Ayrshire Council
Strategic Housing
Investment Plan
2023 - 2028 
98

Page 99

Introduction 
Purpose
Environment 
A Strategic Environmental Assessment
(SEA) pre-screening questionnaire
undertaken for the LHS confirmed that
the development proposals within the
SHIP have been scoped within the SEA
for the North Ayrshire Local
Development Plan.
Strategic Policy Context 
Housing to 2040, Scotland’s first 20-year
housing strategy, was announced in
March 2021. The strategy commits to
providing around £16bn of investment to
support the delivery of 100,000 new
homes by 2032, with at least 70% of
these being for social rent.  The Scottish
Government’s Affordable Housing Supply
Programme (AHSP) comprises a range
of funding mechanisms to enable
affordable housing providers to deliver
homes in communities across Scotland
to support local authorities’ Local
Housing Strategies.  The Scottish
Government has allocated Resource
Planning Assumptions (RPAs) for the full
five-year period of the current parliament
to deliver the ambitious affordable homes
target set out in Housing to 2040. 
The SHIP is an extension of, and aligns
to, the Local Housing Strategy 2018-22
(LHS). In preparing the SHIP, the
Council has referred to the outcomes
identified in the LHS, which support
objectives of the Council Plan. 
The SHIP also aligns with the Council’s
Economic Recovery and Renewal
Approach, which sets out how the
Council, in conjunction with our
residents, will recover and renew
services by: building upon the outcomes
of the Council Plan; committing to
Community Wealth Building; and
committing to a Green New Deal. 
Equalities 
In line with our Council Plan, fairness and
equity is core to the Strategic Housing
Investment Plan. We strive for a North
Ayrshire where everyone has the same
life chances to grow, prosper and have
fulfilling and healthy lives.  An Equality
Impact Assessment has been
undertaken for the SHIP.  It found that
there are no negative or discriminatory
effect on any equality groups. 
The provision of new social housing will
have a positive impact on those who
require specialist accommodation, older
people, those who are homeless, or at
risk of homelessness, and those for
whom purchasing a home is not an
affordable option. The benefits of new
build housing in relation to health,
wellbeing and educational attainment,
are well documented.  
The Strategic Housing Investment
Plan (SHIP) 2023-2028 sets out the
priorities for affordable housing
investment in North Ayrshire over
the next five years and outlines
how the Council and its partners
will deliver these priorities. The
focus of the SHIP is to support the
Scottish Government’s Affordable
Housing Supply Programme
(AHSP) which delivers affordable
housing for rent in North Ayrshire.
99

Page 100

Consultation and Collaboration     Key SHIP Stakeholders 
As the strategic housing authority, the Council is
committed to supporting our partners to deliver
affordable housing development within North Ayrshire. 
The Council adopts a collaborative approach in the
preparation of the SHIP. The key stakeholders opposite
have influenced the final programme. 
In preparing the SHIP 2023-2028 the Council invited site
nominations from its Registered Social Landlord (RSL)
partners.  All developments proposed were considered
on their individual merits, with reference to the
development priorities set out within the LHS and any
known constraints. 
Thereafter, the Council issued the draft SHIP to its
partners to review the priorities of each individual site
and assist in agreeing the wider plan. The Council will
continue to monitor the development programme and
any arising opportunities at quarterly meetings held with
developing RSLs and the Scottish Government. 
Council Officers monitor the impact of the new build
programme on education facilities and other services
through the SHIP Project Board. 
If any project becomes delayed or non-viable, the
Council will work with RSL partners and the Scottish
Government to ensure that new homes are delivered by
Local registered social landlord partners,
including ANCHO, Cairn, Cunninghame Housing
Association (CHA), Link Group Ltd, Riverside
Scotland and Trust Housing Association
North Ayrshire Council internal departments,
including Economic Growth, Education, Finance,
Housing, Planning, Property Management and
Investment, Active Travel and Transport, Roads,
and the Health and Social Care Partnership
The Scottish Government
100

Page 101

accelerating other projects within the SHIP.
Investment Priorities 
Consider their role in providing health benefits to tenants and supporting young people to maximise their educational attainment.   
North Ayrshire’s Local Child Poverty Action Plan and Report
2020/21 recognises that the instance of child poverty within
North Ayrshire is one of the highest in Scotland. 
Research undertaken by Shelter suggests children can
benefit from improved cognitive development and a
reduction in behavioural issues through living in a more
attractive, warmer, and better ventilated environment.  All
new build Council family homes have study space and
private gardens. 
Developing the Young Workforce have launched an online
Skills Academy to support school leavers and job seekers.   
The North Ayrshire Local Employability Partnership Delivery Plan 2022 – 2026 sets out the intentions to help people of all ages to gain skills
for employment. It will prepare people for employment, training, education and/or volunteering, with the aim of increasing qualification levels
and job prospects as well as reducing unemployment. 
We are committed to working alongside Education colleagues to determine how our housebuilding programme can support the Council’s
ambitions to encourage more young people into training and employment. 
The LHS indicates the importance of establishing clear investment priorities to meet the housing needs of local people,
allow partners to identify projects, and ensure that the Scottish Government’s goals for new affordable social homes
are supported. To ensure maximum benefit is achieved from social housing investment, all projects must: 
101

Page 102

Be attractive and have aesthetic value, to contribute
to the regeneration of North Ayrshire, including its
town centres.   
The provision of affordable, modern and well-designed
homes that meets residents’ needs is one of nine
strategic priorities within the Council Plan.  Public sector
investment can have a transformational impact within
communities, and there are cumulative benefits through
considering how this can be coordinated with developing
partners and the private sector. 
The Council explores site and area specific opportunities
with partners to secure maximum regeneration benefits. 
This supports the ambitions of the Council’s
Regeneration Delivery Plan to drive forward development
on strategic regeneration sites, including town centres. 
Town centre regeneration is a primary focus of the SHIP,
with several projects completed to date within, or near,
town centres.   
The SHIP supports major housing led regeneration in
North Ayrshire, an example being provision for the
replacement of the 275 homes in the Fullarton tower
blocks in Irvine which are scheduled for demolition. The
SHIP also includes the provision of funding for 250 units
to assist the delivery and funding of Housing’s Estate
Based Regeneration Programme (EBRP).  This
investment aims to provide new homes to replace any
stock which requires to be demolished or reconfigured as
part of the EBRP. 
The Kings Arms located in Irvine Town Centre will be
redeveloped to provide 6 new amenity flats
The Fullarton tower blocks in Irvine is a major regeneration project
102

Page 103

Be sustainable. Project design,
building materials and component
parts will maximise energy efficiency
and reduce running costs. Design will
also contribute to community stability
and promote feelings of safety and
inclusion. 
The Council’s Environmental
Sustainability & Climate Change Strategy
includes actions to achieve net-zero
carbon emissions by 2030.  The delivery
of new housing has a key role to play in
carbon reduction, climate change
mitigation, and alleviation of fuel poverty. 
The Council and its partners will continue
to consider innovative and sustainable
approaches to heat and power, such as
low carbon heat, solar photovoltaic panels
and smart technologies.  The Council
recognises that a ‘fabric first’ approach to
sustainability can provide benefits to
tenants, in terms of reducing heating
costs, and also benefit the environment,
all of our homes are designed to minimise
heat loss. 
The Council completed two ‘sustainable
demonstrator homes’ within Dickson
Drive, Irvine in 2020 to highlight best
practice in design and innovation,
ensuring benefits from sustainable
technologies are maximised. The benefits
are currently being assessed, and the
findings will be shared with partners to
inform future developments. To build
upon this, we are developing a
‘sustainability shopping basket’ to
establish a standard suite of sustainability
measures for each development and
have committed to engaging a
sustainability expert to ensure technology
delivers low fuel costs for tenants whilst
maximising energy efficiency and
reducing carbon emissions.   
All Council developments are planned
using ‘secure by design’ principles.  Also,
in recognition of the safety benefits of
sprinkler systems, the Council installed
sprinklers in all new build housing
proposals which reached technical design
stage after October 2019, prior to the
introduction of Building Standards
legislation in March 2021.
Biomass District Heating Network at Flatt
Road, Largs
Dickson Drive, Irvine
103

Page 104

Recognise local needs and aspirations and become an integral
part of existing estates. Homes should be designed in such a
way that they can be ‘homes for life’ and easily adapted to the
changing needs of their occupants.   
It has become clear from numerous development project consultation
events carried out by the Council and its partners to date, that most
local people express a preference for houses rather than flats. In
some areas it may be appropriate to include flatted development,
which will be assessed on a case-by-case basis. 
In 2019, the updated North Ayrshire Housing Allocation Policy
removed the age restriction for the allocation of amenity housing. 
The allocation of amenity homes to younger people with mobility
requirements promotes independent living and ‘homes for life’. 
The Council and its partners recognise that bringing former social
housing stock into ownership can assist with housing management
and maintenance issues and increase housing available through the
North Ayrshire Housing Register.  Empty homes are detrimental to
the local environment, often the target of antisocial behaviour and are
more likely to fall into disrepair. Bringing empty homes back into use
is a strategic priority within the current LHS and will continue to be a
priority in the future.  The second hand and empty homes buy back
scheme can also assist the Council to deliver our Estate Based
Regeneration Programme by acquiring homes in communal blocks or
in areas identified for improvement through the scheme.
Before and after photographs of an empty home brought back
into use
104

Page 105

Maximise return on investment and value for money by considering build and lifetime maintenance costs.  
As part of the tendering process we prepare a minimum
specification for materials utilised in our new build
developments to ensure that they align to our current
lifecycle replacement and maintenance programmes.  We
have also developed a suite of standard house types to
further assist with maintenance programmes and reduce
project design costs. 
The Council is committed to making efficiency savings
through strategic procurement arrangements in the
delivery of our new build affordable housing programme,
to ensure value for money for our tenants.  We have
procured contractors for several SHIP projects through
the HubSW, as part of a procurement strategy to achieve
cost and time savings through economies of scale.  The
Council has also, with ten local authority partners, worked
with Scotland Excel to develop a New Build Residential
Construction Framework Agreement available for use by
all Scottish local authorities and registered social
landlords.   
The LHS recognises that many tenants in social housing
are on lower incomes and/or dependant on benefits. The
Scottish Housing Regulator expects social landlords to be
able to demonstrate affordability and engage meaningfully
with tenants on rent increases. Therefore, to ensure
homes are affordable, partners are expected to set rent
levels on new build homes at or below the Local Housing
Allowance.
Standard House Type: 3-bedroom ground floor living for wheelchair users
105

Page 106

Involve the local community through
consultation and wider action initiatives.  
The Council and our partners engage with
local communities when developing all new
build development sites through the SHIP. 
For Council projects local residents are
invited to review and comment upon the draft
plan for the site.  Thereafter the final plans
are presented to the community and local
residents are also invited to ‘Meet the
Builder’ when a contractor has been
appointed. 
The Council’s Community Wealth Building
Strategy introduced a new model to develop
resilient, inclusive local economies, with
more local employment and a larger and
more diverse business base, ensuring that
wealth is locally owned and benefits local
people.  Through the SHIP, contractors are
expected to participate in the Council (or
partners’) Community Benefits scheme,
providing apprenticeships to young people,
skilling up the local workforce and supporting
economic growth. Homes for Scotland
suggests there are 4.1 jobs created for every
new home constructed. Effective use of
community benefit clauses in development
contracts, and partnership work with
colleagues in Economic Development to
support our local construction and supply
chain companies to bid for this work, can
secure many of these jobs for our local
people. 
The Council is currently developing a pilot
model for employability by offering training
and employment opportunities obtained
through community benefits from Housing
Services maintenance and investment
contracts to our Housing First tenants,
supporting some of our most complex
support cases to sustain housing and
employment. 
The Council also plans to undertake a review
of our Dickson Drive, Irvine house building
pilot and will utilise this to inform a second
project with Building Services to construct a
number of new homes at Ayrshire Central,
Irvine.   
Seek to continually improve, with lessons
learnt and good practice shared across all
partners.  The Council regularly meets with
the Scottish Government and our partner
RSLs to review the progress of the SHIP and
share good practice and lessons learned. 
The Council also holds ‘lessons learned’
meetings and undertakes tenant satisfaction
surveys for each site.
All projects which meet the criteria
outlined within the SHIP will be
considered to be ‘high priority’. In
the case of developments by
Registered Social Landlords
(RSLs), the housing mix and type
for each individual development
site and the proposed rent levels
for the new homes should be
formally agreed with the Council
prior to the submission of a
planning application. 
Projects from the SHIP 2022-2027
which have not yet completed have
been included in the new 2023-
2028 plan.  Thereafter, the Council
will prioritise all projects which are
considered deliverable and meet
the strategic goals outlined above. 
106

Page 107

Demand 
Demand figures have been obtained from the North Ayrshire Housing Register (NAHR). House size
and type priorities have also been informed by the NAHR. 
The HNDA sets the housing estimate for the period 2022-2027 as 2,330 new units, either in the
social rented sector, or, in the case of strong economic recovery, split across all tenures. 
Housing supply targets will be set out in the new Local Housing Stategy which is currently being
prepared. 
Location 
A Sub Housing Market Areas (SHMA) is the widest area that a person would be willing to move to for new living accommodation for the
purposes of strategic housing planning. North Ayrshire contains five SHMAs, these are: 
The North Ayrshire Community Planning Partnership approach sets out six localities. The localities align to the SHMAs with the exception
of the Irvine and Kilwinning localities which combine to form one single Sub Housing Market Area. 
The total number of homes which will be developed over the lifetime of the SHIP have been plotted by SHMA in figure 1 below. These new
supply figures illustrate the aspiration to plan for a growing population, and to seek continued investment in our housing stock to improve
overall stock condition.   
Arran Garnock Valley Irvine/Kilwinning North Coast
(incl. Cumbrae) Three Towns
Whilst there are 6,994
applicants on the
NAHR, only 49% of
these applicants
(3,460) have a
recognised housing
need (NAHR, August
2022).
107

Page 108

Figure 1: SHIP Actual & Projected Completions 2022-2028 & Net Gain 2022-2028 
The 'net gain' columns indicate the additional homes available per locality following completion of the developments, minus the strategic
demolitions set out in the SHIP. 
To further inform demand for housing on the Isle of Arran, the Council has undertaken research to determine locality preferences for housing
on the island. 
Development is not the only policy intervention being explored by the Council. It would be very difficult for the Council
and its partners to meet housing need only through investment in new homes.   
Work to maintain and improve the condition of our existing social housing stock, provide aids and adaptations and
improve the private rented sector are all intended to address the housing needs of the local population
108

Page 109

Size 
Analysis of the North Ayrshire Housing Register identifies demand trends for properties. House size has been identified by considering the
minimum accommodation size suitable for the household; this is referred to as the 'strategic bedroom requirement’.   
Table 1: % Applicants by Strategic Bedroom Requirement and SHMA 
No of Beds Three Towns Arran Garnock Valley Irvine / Kilwinning North Coast North Ayrshire
1 60% 54% 56% 56% 63% 57%
2 14% 14% 10% 15% 14% 14%
3 15% 20% 20% 15% 15% 16%
4 7% 9% 6% 10% 5% 8%
5+ 4% 3% 8% 4% 3% 5%
(Source: North Ayrshire Housing Register, August 2022) 
The strategic bedroom need is used for planning purposes only. Generally, one-bedroom homes are found to be of lower demand.  Two-
bedroom homes are a more popular option for smaller households and are more flexible in meeting households’ future needs. An additional
bedroom can also provide study space, or space for home working. 
An indicative size mix (Table 2) for developments across North Ayrshire has been prepared by uplifting the two-bedroom provision and
reducing the one-bedroom, thus meeting tenant aspirations and providing flexibility in terms of property sizes as households change
composition over time. 
Table 2: Altered Demand by Bedroom Size (Reflecting Aspiration) and SHMA 
This mix is intended as a guide only; each project will be considered on a site-by-site basis by the developing organisation, before being
approved by the Council. 
No of Beds Three Towns Arran Garnock Valley Irvine / Kilwinning North Coast North Ayrshire
1 14% 14% 10% 15% 14% 14%
2 60% 54% 56% 56% 63% 57%
3 15% 20% 20% 15% 15% 16%
4 7% 9% 6% 10% 5% 8%
5+ 4% 3% 8% 4% 3% 5%
109

Page 110

Dementia Friendly Design
Wet Floor Shower Rooms with
Contrasting Fittings as Standard Visiting Service Rooms
Specialist Housing Needs 
Housing for Older People 
Analysis of the HNDA and the NAHR indicates a rising need
for accommodation for older people. For this reason, the
LHS sets a target of approximately 25% of all new homes to
be suitable for older people (i.e., amenity housing and
sheltered accommodation). It is anticipated that these homes
will primarily comprise one and two bedrooms.  In the 12
months from 1 September 2021, 70% of applicants allocated
amenity housing were aged over 51. The Council will
continue to monitor the availability of housing for older
people to ensure that their needs can be addressed through
the affordable housing supply programme.   
Alongside the new build programme, the Council will
continue to deliver our Sheltered Housing Re-provisioning
Programme, which includes £25m investment in the
refurbishment of sheltered housing units out with the SHIP. 
Glencairn House Sheltered Complex
110

Page 111

Extra Care Housing 
Housing Services and the Health and Social Care Partnership worked together over the last few years to consider a model for Extra Care
Sheltered Housing. The vision was to create safe, affordable homes for tenants who require additional support, with extra services to
promote independent living, such as assistance with meals or welfare checks, to be available to tenants for an additional fee. 
Following development of the outline model, demand analysis was undertaken by the Health and Social Care Partnership in 2021 alongside
engagement with other areas in Scotland where similar housing models operate.  At that time, it was determined that there was not sufficient
demand to integrate the model into a new sheltered housing complex and there are challenges in sustainable funding to operationalise the
model.  The Council has, however, incorporated flexibility into some new build sheltered complexes to allow this model to be reconsidered
in the future should the HSCP chose to develop this further. 
Assistive Technology 
In order to promote independent living, the Flatt Road development in Largs is being used as an exemplar for assistive technology.  Features
that can be installed within the sheltered housing complex and supported accommodation, where required, to support tenants’ individual
needs include: 
An integrated home communications hub with:
video door entry video calls electronic welfare
checks
enhanced assistive
technology
safety monitors
and sensors
electronic
noteboard &
calendar
android apps
Automatic lights and blinds
Smart heating controls
Super-fast broadband
111

Page 112

2 Bedroom Wheelchair User Bungalow
Wheelchair Accessible Accommodation 
‘Housing for Varying Needs’, a national design guide, provides the following definitions which have been adopted by the LHS when
describing the applicable specialist housing: 
All amenity and sheltered housing in North Ayrshire should be built to an ambulant housing standard as a minimum.  To ensure need is met
now and in the future, the LHS sets a target for all partners to ensure at least 7% of all new build stock is fully wheelchair accessible.  To
date, 16% of new build homes delivered by North Ayrshire Council are suitable for wheelchair users.  It should be noted that most demand
for wheelchair user housing comes from those under 60 years old.  In addition, we have a set of standard house types for our developments,
which are of an accessible design to accommodate changing mobility needs.   
In 2019, the Scottish Government issued guidance for local authorities on the setting of LHS targets to support the delivery of more
wheelchair accessible housing, including the requirement for a private sector target.  The Council will consider this during renewal of the
LHS in late 2022, and the next Local Development Plan due to be published in 2023. 
Occasionally it may be necessary to build larger specialist housing to meet the specific needs of individual households. Where this is being
provided by an RSL, the Council will approve the proposals before a planning application is submitted. 
Ambulant Housing
Meets a wide range of specialist housing needs. The majority of demand is
likely to be from the older age group, who have mobility problems, but who
can walk with (or without) an aid. Some people in this group may occasionally
use a wheelchair. Demand is not exclusive to the older age group; mobility
issues can affect people throughout their lives, for various reasons.
Wheelchair User Housing
For people who use a wheelchair all or most of the time. The home will be level
access throughout, have space for a wheelchair to circulate and access all
rooms, a kitchen and bathroom that suits the occupant's particular needs and
fittings and services that are within reach and easy to use. A wheelchair user
may live alone, or with a carer or partner or be part of a family unit.
112

Page 113

Supported Accommodation 
Officers within the Place Directorate and the
Health and Social Care Partnership have
developed a new supported accommodation
housing model for implementation at various
sites across North Ayrshire. 
The focus is on maximising independence for
adults within a homely setting, who require a
higher level of support, and who are living with
learning disabilities, or mental ill-health issues
(all ages), or who are under 65 years and have
physical disabilities.  The new supported
accommodation model can: 
The SHIP will support the Health and Social Care Partnership to meet specialist housing need through dedicated supported accommodation
projects, and as part of a wider site mix on other developments. The SHIP makes provision for delivery of 25 supported accommodation
housing units at two different locations in addition to the 37 homes already delivered.  
prevent
demand for
additional
services
support a
more
independent
lifestlye for
service users
integrate
residents into
community
life
use
technological
advances to
support care
provision
provide care
and support
in a homely
setting
provide a
base for
effective care
provision
realise
financial
savings for
the HSCP
Supported accommodation at Bessie Dunlop Court, Dalry
113

Page 114

Gypsy / Travellers   
The Council has not identified any
additional demand issues in relation to
accommodation for gypsy / travellers.  We
will, however, review the condition of our
permanent site at Redburn, Irvine in
consultation with residents to identify any
future maintenance and investment
works. 
When this review is complete, the Council
will apply to the Scottish Governments
Gypsy / Traveller Accommodation Fund to
seek funding for any necessary
renovation or improvements to our
Redburn site. 
Island Communities   
The Council is committed to supporting
our island communities. 18 new homes
were completed on the Isle of Cumbrae
during summer 2021.  The site provided a
mixture of general needs houses, amenity
bungalows and homes for wheelchair
users.   
The Council also completed 34 new
homes at Brathwic Terrace on the Isle of
Arran during June 2022.   
A ‘Local Lettings Initiative’ was introduced
for Arran prior to the allocation of the new
Council homes. The Local Lettings 
Initiative gives additional priority to island
residents and key workers.   
Trust Housing Association is currently in
discussions with a local landowner to
develop 26 new units on Arran. 
These developments, alongside work with
communities on the island, are anticipated
to stimulate investment in other
infrastructure (transport, marine, digital) to
encourage economic growth. 
The Council will closely monitor demand
for future affordable housing on the island.   
St Beya Gardens, Cumbrae   St Beya Gardens, Cumbrae    Brathwic Terrace, Arran
114

Page 115

Homelessness 
North Ayrshire Council’s Rapid Rehousing Transition Plan 2019 –
2024 was approved in 2019. Our vision is to reduce the time spent
in temporary accommodation by enabling homeless households to
access settled accommodation quickly and with the right support
to sustain their housing outcome.  The North Ayrshire RRTP
outcomes are: 
The provision of new affordable housing through the Strategic
Housing Investment Plan will continue to support the delivery of
the Rapid Rehousing Transition Plan. 
Alternative Models of Affordable Housing Delivery 
Recognising that a suite of affordable housing solutions is required
to meet the needs and aspirations of local people, the Council has
embarked on two pilot projects aimed at the private housing
sector.   
The ‘HOME (Home Ownership Made Easy)’ project is based on a
model devised by Scottish Futures Trust. This shared ownership
housing option will provide households the opportunity to
purchase a stake in a home.  Two options are available, which
have been named for the level of investment required to secure
the HOME: 
• The £5k HOME, aimed at first time buyers.
• The £40k HOME, aimed at owner-occupiers over 60 years who
wish to downsize or secure more accessible housing.   
The Council’s ‘BUILD’ project will offer six fully serviced self-build
plots for sale to individuals interested in this type of project.   
Private Sector Property Condition 
The Council’s revised Scheme of Assistance 2019 introduced a
range of new measures to improve private sector housing
condition, including:
A ‘pre-tenancy support service’ for landlords to aid the
prevention of future property condition issues.
A ‘missing shares scheme’ to remove barriers where a
property owner refuses to meet their common repair
obligations.
Use of the Council’s powers for Compulsory Purchase Orders
(CPOs) where appropriate to acquire empty properties in poor
condition, bringing them back into mainstream housing stock.
115

Page 116

SHIP Funding Streams 
Affordable Housing Supply Programme
The Scottish Government has committed to providing North Ayrshire with
£63.005m funding for the Council and our RSL partners from April 2022 to
March 2026 (see table 3 below).  The SHIP is based on projected grant
funding of £120.855m.  Funding for Council projects not yet at tender stage
has been assumed at benchmark plus annual Scottish Social Housing
Tender Price Index inflation which was 8.3% for 2021/22 and has been
assumed at 8.6% for 2022/23 and 3.7% for 2023/24.  The Council will seek
grant funding above these levels on a site-by-site basis, as required. The
RSL funding rates have been included as requested by each developing
organisation and will be subject to Scottish Government authorisation.     
Reserves & Balances
All developing organisations
will utilise available reserves
and balances to support the
development programme.
Borrowing
The majority of development funding
is secured from borrowing. Private
finance supports RSLs’ development
programme, and prudential borrowing
supports local authority new build
projects.
Affordable Housing Policy Developer Contributions
The Council’s previous Affordable Housing Policy (RES4), which required
contributions to affordable housing provision from specified private
developments within North Ayrshire, was removed within the new Local
Development Plan (LDP2) which was adopted on 28 November 2019. 
Developer contributions, in the form of commuted sums, received through
the application of the Affordable Housing Policy to date under the previous
Local Development Plan, will be utilised to fund projects being delivered
through the SHIP, when required.
Other Funding
Sources
The Council will consider
utilising the Vacant and
Derelict Land Fund to
support the regeneration of
SHIP sites, where
strategically aligned to the
Council’s Regeneration
Delivery Plan.
Council Tax on Empty &
Second Homes
Income received from the reduction in
discount for empty and second homes
in North Ayrshire is held in the
Council’s Affordable Housing Account.
The Council provides grant funding to
support the development of projects
within the SHIP from the Affordable
Housing Account, when required. 
To meet the requirement for ‘slippage’, in accordance with Scottish Government guidance, the Council has over committed the funding
within the SHIP.  The slippage requirement is to ensure that the allocation is fully spent even if delays or constraints emerge on other
development sites, and to provide the opportunity for North Ayrshire to absorb slippage from other local authority areas.
Table 3: North Ayrshire Resource Planning Assumption per Annum 2022/23 to 2025/26  
2022/23 2023/24 2024/25 2025/26 Total
RPA £15.692m £15.648m £15.702m £15.963m £63.005m
116

Page 117

Planning and other
Regulatory Matters 
In 2014, the Council’s Cabinet approved the House Building
Protocol, to be used in all Council housing development projects
that meet the criteria for permitted development. Class 33 of the
Town and Country Planning (General Permitted Development)
(Scotland) Order 1992, as amended, enables local authorities to
carry out works, within their district, for the erection of dwellings
so long as the development conforms with the Local
Development Plan. 
In 2019, it was agreed that all future Council housing
developments progressed as permitted development will be
required to obtain a ‘Certificate of Lawfulness’ from the Council’s
Planning Service. This will certify that each site within the SHIP
has been considered against the full terms of the adopted Local
Development Plan. Housing development proposals by the
Council which do not fall within the scope of permitted
development, including schemes which require an Environmental
Impact Assessment (EIA) will require planning permission.
Proposals over 0.5 hectares in area will require to be screened
for the purposes of EIA. 
Risks to delivering the
SHIP 
Whilst delivery of the SHIP programme has recovered following
the temporary suspension of all projects on site in March 2020,
this has had longer term implications.  COVID-19 continues to
have an impact on the construction industry. 
Through our own experience and engagement with RSLs and
other developers, development constraints or risks to delivery of
the programme have been identified as: 
 Building costs inflation and rising tender prices
 Shortages of materials
 Capacity within the building and development industry
across the country
 Costs of infrastructure and ground remediation
 Delays to getting statutory utility consents in place
 Workforce interruptions related to COVID-19 
The Council and our partners will continue to work closely
to monitor and actively manage these risks through the period of
the SHIP. 
117

Page 118

Amendments or Additions to the SHIP 
The delegated authority to accelerate any project detailed within the North Ayrshire approved SHIP is held by the Executive Director (Place)
and the Cabinet Member for Place. 
SHIP Development Projects 
An overview of projects detailed in the SHIP tables is provided below by locality.   
Irvine & Kilwinning 
Project Timeline Site Information
St. Michael’s Wynd,
Kilwinning (NAC)
79 units
Site Start: September 2020
Completion: 
7 September 2022
The new homes link to the first phase St Michael’s Wynd development.   The site
includes general needs, amenity, wheelchair user housing, sheltered housing and
supported accommodation and benefits from good transport links.
Harbourside, Irvine
(NAC)
71 units
Site Start: October 2020
Expected Completion: 
Early 2023
The site is in a high-demand area and is a short walk from Irvine Beach Park, the town
centre, shopping mall and train station. The site will deliver an intergenerational
development with a particular focus on older people’s housing provision. 
Bourtreehill Village,
Irvine (NAC)
32 units
Site Start: Autumn/winter 2023 
Expected Completion: 
Autumn/winter 2025 
The site will see the regeneration of the Bourtreehill Village area of Irvine. Consultations
are underway with residents of the local area and interested parties to develop the
vision for the site.  
Corsehillhead,
Kilwinning (NAC)
7 units
Site Start: Spring 2023 
Expected Completion: 
Spring 2024
The site will deliver a mix of general needs and amenity accommodation in the Corsehill
area of Kilwinning.
Montgomerie Park,
Irvine (NAC)
189 units
Site Start: Summer 2023
Expected Completion: 
Winter 2026  
This site will provide a mix of general needs, amenity and wheelchair user
accommodation. 
118

Page 119

Ayrshire Central, Irvine
(NAC)
202 units
Site Start: Spring 2023
Expected Completion: 
Spring 2026
Located in a high demand area, this site will deliver a mix of general needs, amenity and
wheelchair properties at the Ayrshire Central, Irvine site.  
Stanecastle, Irvine
(NAC) 
31 units
Site Start: Spring 2023
Expected Completion: 
Autumn 2024
This site will deliver a mix of general needs, amenity and wheelchair user
accommodation on the site of the former Stanecastle School.
Fullarton Street, Irvine
(NAC) 
62 units
Site Start: Early 2024
Expected Completion: 
Summer 2025
This project will deliver a mix of general needs, amenity and wheelchair accommodation
on the site of the Irvine High Flats which are scheduled for demolition.
King’s Arms, Irvine
(NAC)
6 units
Site Start: Spring 2023
Expected Completion: 
Autumn 2024
This project involves the regeneration of a prominent town centre building to deliver six
amenity flats.
Confidential Site 1
(Cairn) 
9 units
Site Start: Winter 2023
Expected Completion: 
Winter 2024
This development will provide general needs, amenity and wheelchair accommodation.
This site is currently confidential due to a requirement for planning consent and for
acquisition of land.
Confidential Site 3
(Cairn) 
4 units
Site Start: Spring 2025
Expected Completion: 
Spring 2026
This site has the capacity for 4 affordable, general needs homes.  This site is currently
confidential due to a requirement for planning consent and for acquisition of land. 
West Byrehill,
Kilwinning (CHA) 
72 units
Site Start: April 2021
Expected Completion: 
February 2023
Located on the edge of Kilwinning, this site will provide a mix of general needs, amenity
and wheelchair user homes. 
Harbour Road, Irvine
(CHA)
27 units
Site Start: Spring 2023
Expected Completion: 
Spring 2024
Located in Irvine Harbourside this site will provide 27 new homes in close proximity to
the town centre and Irvine train station. 
Bank Street, Irvine
(CHA)
16 units
Site Start: Spring 2025
Expected Completion: 
Spring 2026
This town centre regeneration project in Irvine was previously allocated for Riverside.
Riverside are no longer able to progress the scheme and CHA are currently determining
the viability of delivering 16 new homes for affordable rent.
Tarryholme, Irvine,
Phase 2 (Riverside)
77 units
Site Start: June 2021
Expected Completion: 
February 2023
This project is a second phase of the Tarryholme development which will deliver an
additional 77 units. 
119

Page 120

Three Towns 
Project Timeline Site Information
Caley Court,
Stevenston (NAC)
16 units
Site Start: August 2021
Expected Completion: 
Autumn/winter 2022
This development is located on the site of a former sheltered housing complex.  The new
homes will provide supported accommodation with an on-site staff base in close
proximity to Stevenston town centre and train station.
Afton Court,
Stevenston (NAC)
6 units
Site Start: Winter 2022
Expected Completion: 
Summer 2023
This town centre regeneration project will deliver 6 amenity bungalows, recognising the
highly accessible nature of this location. Modular construction will be utilised to reduce
the time on site and the impact of the works on local residents.  
James McFarlane,
Saltcoats (NAC)
19 units
Site Start: Spring 2023
Expected Completion: 
Spring/summer 2024
The site of the former James McFarlane school will provide general needs, amenity and
homes suitable for wheelchair accommodation. 
James Reid, Saltcoats
(NAC)
47 units
Site Start: Spring 2023
Expected Completion: 
Winter 2024
The site of the former James Reid school and the former Focus Centre will provide general
needs, amenity and wheelchair accommodation. 
Glebe Place, Saltcoats
(NAC)
8 units
Site Start: Spring 2026
Expected Completion: 
Spring/summer 2027
This regeneration project which includes the demolition of low demand flats can
accommodate approximately 8 new affordable homes near Saltcoats town centre.  
Regeneration Project
1d, Ardrossan (NAC)
36 units
Site Start: Autumn 2024
Expected Completion: 
Spring 2026
This project provides a regeneration opportunity for 36 affordable homes, comprising
general needs, amenity and wheelchair accommodation. 
Regeneration Project
1e, Ardrossan (NAC)
7 units
Site Start: Spring 2024
Expected Completion: 
Spring/summer 2025
This regeneration opportunity can accommodate approximately 7 new affordable homes. 
Glebe Street, Saltcoats
(CHA)
2 units
Site Start: June 2026
Expected Completion: 
March 2022
This formerly vacant site provided 2 homes suitable for wheelchair users. This site was
also supported by funding from the Council’s Affordable Housing Account. 
Green Street, Saltcoats
(CHA)
24 units
Site Start: April 2022
Expected Completion: 
Spring/summer 2023
Demolition of the former building on the site is now complete and works to construct the
24 new amenity homes commenced in April 2022. 
Sharphill Phase 5,
Saltcoats (CHA)
100 units
Site Start: Spring 2023
Expected Completion: 
Winter 2024
The next phase of the Sharphill site will deliver an additional 100 new homes, providing a
mix of general needs, amenity and wheelchair user homes. 
120

Page 121

Garven Road,
Stevenston (CHA)
20 units
Site Start: Spring 2023
Expected Completion: 
Spring/summer 2024
This site was formerly known as Confidential Site 8 and has capacity to deliver 20 new
homes.
Confidential Site 9,
Stevenston (CHA)
70 units
Site Start: 
Expected Completion: 
This site has been removed from the SHIP as it is not viable.  The 70 units have been
moved to the ‘Unallocated CHA Block’ to provide CHA with capacity for future
development within the SHIP as sites are identified.
Confidential Site 10,
Ardrossan (CHA) 
50 units
Site Start: Spring 2025
Expected Completion: 
Winter 2026
This project has capacity for up to 50 homes and is confidential until site feasibility can
be confirmed. 
Confidential Site 11,
Saltcoats (CHA)
22 units
Site Start: 
Expected Completion:
This site has been removed from the SHIP as it is not viable.  The 22 units have been
moved to the ‘Unallocated CHA Block’ to provide CHA with capacity for future
development within the SHIP as sites are identified.
Parkend Gardens,
Saltcoats (Link)
12 units
Site Start: Early 2023
Expected Completion: 
Early 2024
This development is located in close proximity to Saltcoats town centre and adjacent to
North Ayrshire Council’s new development at Kyleshill Court, Saltcoats. It will deliver a
mix of general needs, amenity and wheelchair accommodation. 
North Coast
Project Timeline Site Information
Former St. Colm’s Place,
Largs (NAC)
29 units
Site Start: June 2021
Expected Completion: 
September 2022
The former sheltered housing complex at St. Colm’s Place was demolished and rebuilt as
part of the sheltered housing re-provisioning programme.  Located in a high demand
central area it has good transport links and access to the town centre. 
Former Largs Police
Station (NAC)
12 units
Site Start: Autumn 2022
Expected Completion: 
Autumn 2023
Located adjacent to the former St. Colm’s Place the former Largs Police Station will deliver
12 amenity flats in the high demand, town centre, location. 
Garnock Valley
Project Timeline Site Information
Former Garnock
Academy, Kilbirnie (NAC)
50 units
Site Start: Spring 2023
Expected Completion: 
Autumn/winter 2024
The site of the former Garnock Academy will see the development of a mixture of general
needs homes, amenity bungalows and homes suitable for wheelchair users. 
121

Page 122

Laburnum Avenue, Beith
(NAC)
7 units
Site Start: Autumn 2023
Expected Completion: 
Autumn 2024
This development will regenerate low demand flatted accommodation to deliver 7 new
affordable homes in Beith.  
Newhouse Drive,
Kilbirnie (NAC)
7 units
Site Start: Autumn 2023
Expected Completion: 
Autumn 2024
This development will regenerate low demand flatted accommodation to deliver 7 new
affordable homes in Kilbirnie.   
Arran
Project Timeline Site Information
Confidential Site 4 
(Trust HA)
26 units
Site Start: Winter 2024
Expected Completion: 
Winter 2026
This site is confidential to allow the acquisition of land and whilst site viability is
confirmed. 
Locality to be Confirmed
Project Timeline Site Information
Unallocated
Regeneration Block (NAC)
30 units
Site Start: Autumn 2024
Expected Completion: 
Autumn 2026
This involves the regeneration of 30 properties to deliver a mix of general needs, amenity
and wheelchair user properties. The locations for these projects have still to be finalised. 
Regeneration Project 3
(Riverside)
30 units
Site Start: Spring 2025
Expected Completion: 
Spring 2027
This project involves the regeneration of 30 properties to deliver a mix of general needs,
amenity and wheelchair user properties. The location has still to be finalised. 
Unallocated CHA Block
(CHA)
92 units
Site Start: Spring 2024
Expected Completion:
Winter 2025 
The 92 units have been allocated within the SHIP to replace Confidential Sites 9 and 11
which were not viable. This will provide CHA with capacity for future development as the
association identifies suitable sites. 
122

Page 123

Official‐Protect#
Appendix 1 SHIP 2023‐2028
Pre 2023/24
2023/24
2024/25
2025/26
2026/27
2027/28
2022/23
2023/24
2024/25
2025/26
2026/27
2027/28
General
Needs
Am
enity
Supported
W
heelchair
GFL
Sheltered
St. Michael's Wynd Kilw X: 229250 Y: 643100 NAC 79 New Build 14 Sep 20 07 Sep 22 2020/21 79 79 - 34 2 10 2 7 24 £4,661,000 £0 £0 £0 £0 £0 £0
Harbourside Irv X: 230880 Y: 638145 NAC 71 New Build 26 Oct 20 31 Jan 23 2020/21 71 71 - 24 11 4 4 28 £4,970,000 £0 £0 £0 £0 £0 £0
St. Colm's Place (Redev 5) Lrgs X: 220370 Y: 659565 NAC 29 New Build 09 Jun 21 15 Sep 22 2019/20 29 29 - 29 £1,711,000 £0 £0 £0 £0 £0 £0
Caley Court Stev X: 226725 Y: 641478 NAC 16 New Build 16 Aug 21 31 Oct 22 2021/22 16 16 £1,123,123 1 15 £1,036,348 £86,775 £0 £0 £0 £0 £0
2nd Hand & Empty Home Buy Backs ! ! NAC 30 Buy Back 01 Mar 22 31 Mar 27 2022/23 5 5 5 5 5 5 5 5 5 5 5 5 £1,200,000 30 £0 £200,000 £200,000 £200,000 £200,000 £200,000 £200,000
Largs Police Station (Redev 13) Lrgs X: 220315 Y: 659560 NAC 12 New Build 29 Aug 22 30 Sep 23 2022/23 12 12 £1,192,712 12 £177,031 £1,015,681 £0 £0 £0 £0 £0
Afton Court (Redev 6a) Stev X: 226665 Y: 641885 NAC 6 New Build 30 Nov 22 01 Jun 23 2022/23 6 6 £664,163 6 £0 £664,163 £0 £0 £0 £0 £0
Nelson Street Lrgs X: 220655 Y: 659595 NAC 3 Refurb 01 Feb 23 01 Feb 25 2022/23 3 3 £171,000 3 £0 £71,000 £100,000 £0 £0 £0 £0
Corsehillhead Kilw X: 231315 Y: 643095 NAC 7 New Build 01 Apr 23 30 Apr 24 2022/23 7 7 £711,516 5 2 £130,500 £0 £581,016 £0 £0 £0 £0
James McFarlane (Redev 8a) Ardr X: 223300 Y: 643345 NAC 19 New Build 01 Apr 23 31 May 24 2022/23 19 19 £1,993,029 10 4 1 4 £233,022 £0 £1,500,000 £260,006 £0 £0 £0
Stanecastle (Redev 11a) Irv X: 234070 Y: 640150 NAC 31 New Build 01 Apr 23 01 Sep 24 2022/23 31 31 £3,204,355 17 7 3 4 £493,411 £0 £1,500,000 £1,210,944 £0 £0 £0
James Reid & FC (Redev 8b) Salt X: 225511 Y: 642690 NAC 47 New Build 01 Apr 23 30 Nov 24 2022/23 47 47 £4,858,216 26 11 4 6 £602,999 £0 £2,161,579 £2,093,637 £0 £0 £0
Garnock Academy (Redev 9) Kilb X: 231290 Y:654800 NAC 50 New Build 01 Apr 23 30 Nov 24 2022/23 50 50 £5,306,966 28 13 2 7 £473,370 £0 £2,500,000 £2,333,596 £0 £0 £0
Ayrshire Central (Redev 12) Irv X: 232105 Y: 640785 NAC 202 New Build 01 Apr 23 31 Mar 26 2022/23 202 202 £20,010,798 65 87 24 26 £2,252,936 £0 £4,000,000 £7,000,000 £6,757,862 £0 £0
King's Arms (Regen 1c) Irv X: 232090 Y: 638935 NAC 6 New Build 01 Apr 23 31 Oct 24 2022/23 6 6 £543,319 6 £0 £0 £543,319 £0 £0 £0 £0
Montgomerie Park, Irvine Irv TBA NAC 189 New Build 01 Aug 23 30 Nov 26 2023/24 189 189 £19,698,882 111 39 19 20 £4,579,235 £0 £3,500,000 £5,000,000 £5,000,000 £1,619,647 £0
Bourtreehill Village (Redev 7) Irv X: 234475 Y: 639220 NAC 32 New Build 01 Sep 23 30 Sep 25 2023/24 32 32 £3,307,722 24 6 1 1 £0 £0 £1,000,000 £2,307,722 £0 £0 £0
Laburnum Avenue (Regen Project 1a) Beith X: 234170 Y: 653640 NAC 7 New Build 01 Oct 23 31 Oct 24 2022/23 7 7 £699,468 4 3 £0 £0 £200,000 £499,468 £0 £0 £0
Newhouse Drive (Regen Project 1b) Kilb X: 230940 Y: 653815 NAC 7 New Build 01 Oct 23 31 Oct 24 2022/23 7 7 £699,468 4 3 £0 £0 £200,000 £499,468 £0 £0 £0
Fullarton Street (HF) Irv X: 232050 Y: 638550 NAC 62 New Build 01 Feb 24 30 Jun 25 2023/24 62 62 £6,355,354 40 15 2 5 £0 £0 £0 £3,200,000 £3,155,354 £0 £0
Refurbishment Project 8 Irv TBA NAC 2 Refurb 01 Nov 23 01 Nov 25 2023/24 2 2 £114,000 2 £0 £0 £14,000 £100,000 £0 £0 £0
Regeneration Project 1e Ardr TBA NAC 7 New Build 01 Apr 24 30 Apr 25 2023/24 7 7 £725,348 4 3 £0 £0 £0 £400,000 £325,348 £0 £0
Regeneration Project 1d Ardr TBA NAC 36 New Build 01 Sep 24 30 Apr 26 2024/25 36 36 £3,983,812 20 5 11 £0 £0 £0 £1,000,000 £2,000,000 £983,812 £0
Unallocated Regeneration Block 1 TBA TBA NAC 30 New Build 01 Sep 24 30 Sep 26 2024/25 30 30 £3,188,953 16 9 2 3 £0 £0 £0 £1,000,000 £1,241,084 £947,870 £0
Glebe Place Salt X: 224700 Y: 641700 NAC 8 New Build 01 Apr 26 30 Apr 27 2024/25 8 8 £836,109 5 3 £0 £0 £0 £0 £0 £422,365 £413,744
Unallocated Regeneration Block 2 TBA TBA NAC 0 New Build - - - - £0 £0 £0 £0 £0 £0 £0
Confidential Site 1 ₴ Irv TBA Cairn 9 New Build 31 Oct 23 31 Oct 24 2023/24 9 9 £910,000 6 3 £0 £0 £600,000 £310,000 £0 £0 £0
Confidential Site 3 Kilw TBA Cairn 4 New Build 01 Apr 25 31 Mar 26 2024/25 4 4 £320,000 4 £0 £0 £0 £0 £320,000 £0 £0
Sharphill (Ph 4) Salt X: 225343 Y: 643182 CHA 76 New Build 20 Jan 20 31 Mar 22 2019/20 76 76 - 65 5 5 1 £6,915,235 £0 £0 £0 £0 £0 £0
Glebe Street (Confidential Site 5) Salt X: 224625 Y: 641747 CHA 2 New Build 07 Jun 21 02 Mar 22 2021/22 2 2 - 2 £144,000 £0 £0 £0 £0 £0 £0
West Byrehill (Phase 1 & 2) Kilw X: 228760 Y: 642710 CHA 72 New Build 12 Apr 21 28 Feb 23 2020/21 72 72 £6,351,729 59 8 3 2 £6,351,729 £0 £0 £0 £0 £0 £0
Green Street (Confidential Site 7) Salt X: 224755 Y: 641300 CHA 24 New Build 18 Apr 22 31 May 23 2021/22 24 24 £2,065,435 22 2 £418,365 £1,647,070 £0 £0 £0 £0 £0
CHA Buy Back Programme ! ! CHA 6 Buy Back 01 Nov 22 31 Mar 28 2022/23 6 1 1 1 1 1 1 £240,000 6 £0 £40,000 £40,000 £40,000 £40,000 £40,000 £40,000
Garven Road (Confidential Site 8) Stev TBA CHA 20 New Build 01 Feb 23 30 Apr 24 2022/23 20 20 £2,050,000 20 £0 £400,000 £1,650,000 £0 £0 £0 £0
Harbour Road Irv X: 231397 Y: 638254 CHA 27 New Build 28 Feb 23 30 Apr 24 2022/23 27 27 £3,224,983 27 £0 £400,000 £1,500,000 £1,324,983 £0 £0 £0
Sharphill (Ph 5) Salt X: 225351 Y: 643409 CHA 100 New Build 01 Mar 23 30 Dec 24 2022/23 100 100 £11,400,000 100 £0 £500,000 £5,246,122 £5,653,878 £0 £0 £0
Confidential Site 11 Salt TBA CHA - New Build - - 2023/24 - £0 £0 £0 £0 £0 £0 £0
Confidential Site 9 ₴ Stev TBA CHA - New Build - - 2023/24 - £0 £0 £0 £0 £0 £0 £0
Unallocated CHA Block TBA TBA CHA 92 New Build 01 Apr 24 01 Dec 25 2023/24 92 92 £10,524,800 64 23 5 £0 £0 £0 £2,500,000 £4,656,800 £3,368,000 £0
Confidential Site 10 Ardr TBA CHA 50 New Build 01 Apr 25 31 Oct 26 2025/26 50 50 £6,951,200 45 3 2 £0 £0 £0 £0 £4,430,000 £2,521,200 £0
Bank Street (111) Irv X: 232720 Y: 639260 CHA 16 New Build 01 Apr 25 30 Apr 26 2024/25 16 16 £2,224,384 16 £0 £0 £0 £0 £1,000,000 £1,224,384 £0
Parkend Gardens Salt X: 225165 Y: 641130 Link 12 New Build 31 Jan 23 31 Jan 24 2022/23 12 12 £1,932,331 8 3 1 £83,625 £0 £297,759 £600,000 £950,947 £0 £0
Tarryholme (Ph 2) Irv X: 233023 Y: 637910 Riverside 77 New Build 07 Jun 21 28 Feb 23 2020/21 77 77 - 30 36 5 6 £6,000,000 £0 £0 £0 £0 £0 £0
Riverside Buy Back Programme ! ! Riverside 15 Buy Back 01 Apr 23 31 Mar 26 2022/23 15 15 £1,170,000 15 £0 £0 £250,000 £600,000 £320,000 £0 £0
Regeneration Project 3 TBA TBA Riverside 30 New Build 01 Apr 25 31 Mar 27 2024/25 30 30 £2,634,000 18 6 2 4 £0 £0 £0 £0 £1,600,000 £1,034,000 £0
Trust Buy Back Programme Arran ! Trust 6 Buy Back 01 Nov 22 31 Mar 28 2022/23 1 1 1 1 1 1 1 1 1 1 1 1 £600,000 6 £0 £100,000 £100,000 £100,000 £100,000 £100,000 £100,000
Confidential Site 4 ₳  Arran TBA Trust 26 New Build 01 Oct 24 30 Sep 26 2024/25 26 26 £4,500,000 26 £0 £0 £0 £1,000,000 £2,000,000 £1,500,000 £0
1652 638 691 197 106 14 6 429 49 352 423 392 7 £137,687,174 988 356 25 91 111 81 £41,233,807 £5,124,689 £27,683,795 £39,233,701 £34,097,395 £13,961,278 £753,744
SHIP 2021 - 2026 £0 £12,700,000 £12,700,000 £12,700,000 £12,700,000
New addition to SHIP £10,160,000 £10,160,000 £10,160,000 £10,160,000
Confidential Sites
Removed from SHIP 2023 - 2028
₳ The access point for this development should be agreed with NAC Roads as the existing road network may not cope with the additional units
₴ This site is located on Open Ground and can only progress subject to a Planning Application for change of use
Dev Units Type Pre 2022/23
Spend
Estimated
Site Start
Estimated
Practical
Completion
SHIP
Approval
Year
Site Starts Site Completions
Scottish
Government
Grant
House Types
Site Town Site Coordinates SHIP Spend
2026/27
SHIP Spend
2027/28
Estimated
SHIP Spend
2022/23 (as at
18/08/2022)
SHIP Spend
2023/24
SHIP Spend
2024/25
SHIP Spend
2025/26
#Official‐Protect
123

Page 124

124

Page 125

NORTH AYRSHIRE COUNCIL
01 November 2022
Cabinet
Title: Estate Based Regeneration Programme (EBRP)
Update
Purpose: To provide a progress update to Cabinet on the delivery
of the HRA Estate Based Regeneration Programme
(EBRP) and to seek approval for a refreshed Programme
for 2022-2029.
Recommendation(s): That Cabinet (i) notes progress on, and revisions to, the
EBRP to March 2022 as noted in Appendix 1; (ii) notes
the revised programme for 2022/23 to recognise slippage
in previous years; (iii) approves the detailed programme
for 2023/24; and (iv) notes that the remainder of the
projects in the Estate Based Regeneration Programme
scheduled for delivery in 2024/25 and beyond, as shown
in Appendix 2, may be subject to revision.
1. Executive Summary
1.1. In January 2019, Cabinet approved a 10-year, £10million Estate Based
Regeneration Programme (EBRP) which aimed to improve Council-owned
housing estates across North Ayrshire.  Implementation of the specific projects
in years one to three of the Programme was agreed, with an annual review to
be presented to Cabinet.
1.2. This report provides an update on projects which were scheduled for 2020/21
and 2021/22, some of which continued to be impacted by the COVID-19
pandemic and other global economic issues affecting the construction industry
and have still to be delivered.  A revised Programme for 2022-2029 is also
included, following a scoping exercise of projects scheduled for 2022/23 and
2023/24.
1.3. Cabinet is asked to note progress on projects undertaken in 2021/22 and
previous years provided at Appendix 1; note the updated Estate Based
Regeneration Programme 2022-2029 as noted in Appendix 2; and approve the
specific projects scheduled for 2023-24.
2. Background
2.1. In January 2019, Cabinet approved a 10-year Estate Based Regeneration
Programme, representing indicative minimum investment in our stock and
estates of some £10m, which is included in the Housing Revenue Account 30-
year Business Plan.
Agenda Item 8
125

Page 126

2.2. The concept of an Estate Based Regeneration Programme was borne through
an aspiration to further invest in our estates to address pockets of low demand
stock; antisocial behaviour; external appearance; parking provision; road and
footpath condition; fencing; landscaping; and general grounds maintenance
issues.
2.3. This approach complements the Council’s ambitious housing development
programme via the Strategic Housing Investment Plan 2022-2027 (SHIP).  The
SHIP sees a commitment to build 1,625 new Council homes by March 2027. 
Several EBRP projects will involve selective demolition of existing stock, which
will attract further investment associated with the replacement new build
provision.  A total allocation of 250 units has been identified in the SHIP for that
purpose.
2.4. The Programme was initially developed though a comprehensive map-based
review of our estates, incorporating condition information, local intelligence,
environmental and visual audits, enquiries and complaints, and ownership
details.  
2.5. The mapping work identified a variety of potential improvements within our
estates, including the need for demolition and redevelopment of low demand
stock, external improvements to existing stock, additional parking provision,
new fencing, new lighting, and bin stores.
2.6. Potential improvements were subsequently assessed using the Scottish
Government’s ‘Place Standard’ tool.  Projects were prioritised based on their
evaluation score, complexity, and programming requirements as well as
anticipated budget availability, and a programme was developed. 
Progress to Date 
2.7. The large-scale improvement project in 2021/22 – Glass Fronted Closes, Irvine
- significantly exceeded the indicative costs provided at programme inception. 
The indicative costs were prepared prior to the full scope of each project being
agreed.  However, due to costs for other projects for the 2020/21 EBRP being
less than estimated, the overall programme remained within budget. 
2.8. Global economic issues which have impacted the construction industry and the
COVID-19 pandemic had - and continue to have - a significant impact on
delivery of the projects scheduled for 2021/22 and 2022/23 in the EBRP. 
Shortages of materials and increasing costs have impacted each project. As a
result, most projects planned for completion during 2021/22 have been re-
programmed or are only partially completed.   
2.9. From 2020/21 onwards the Programme has been funded through a dedicated
capital budget. The total spend for 2021/22 was £0.440m against provision
within the HRA capital budget of £1.530m (this figure includes a carry forward
of £0.530m from previous financial years).  The underspend will be carried
forward to support the reprogrammed projects. 
126

Page 127

2.10. A new Housing team was established during 2021 to support the delivery of the
Estate Based Regeneration Programme. One of the objectives of the team is to
assist in co-ordinating information following scoping works for projects in future
years and engaging with tenants on individual proposals. 
Programme Revisions 
2.11. Following development of the initial EBRP in early 2019, a Project Board was
established.  The group remit of the group includes oversight of the scope,
design, and implementation of projects, in addition to continuous review of the
Programme to address emerging issues and ensure alignment with strategic
objectives. 
2.12. The following revisions have been made to the original schedule in the 2021-
2029 Programme: 
o The proposed regeneration projects at Bourtreehill Village and Fullarton,
Irvine have been removed from this programme as both projects are being
progressed and reported through the Strategic Housing Investment Plan
2023-2028 (SHIP). 
o Identification of redevelopment options for derelict land at Fergushill Road,
Kilwinning and Regeneration Project 13, Stevenston have been removed
from the Programme.  Both are subject to discussions with developing
partners through the SHIP. 
o The budgets for parking and render improvements in the original programme
have been combined to create a budget for ad-hoc minor projects. This will
allow flexibility for minor estate issues to be resolved expeditiously. 
o Allocated budgets in the original programme have been revised based on
the scoping information gathered to date.  Larger projects have also been
split over financial years where required to reflect the estimated time for
acquisitions (where appropriate), procurement and consultation.   
o The noted interventions detailed in appendix 2 regarding the confidential
regeneration projects have been revised to ‘develop regeneration plan’ to
allow a full scope of works and project plan to be developed to better inform
the programme. 
Estate Based Regeneration Programme 2022-2029 
2.13. The updated programme comprises a range of projects across localities and
covers a period of seven years. It is predicated on provision within the Housing
Revenue Account (HRA) capital budget of £1m per annum for each of the
seven years plus funds carried forward from previous financial years; the total
remaining budget is £8.822m. 
2.14. A review of all proposed projects for the current and forthcoming year has been
undertaken, and their indicative costs updated. The budgeted costs for the
127

Page 128

projects within the wider programme are indicative at this stage. Cabinet
approval is sought for the projects scheduled for 2023/24.  For the projects
planned for 2024/25 to 2028/29 timescales shown are indicative and are
subject to further detailed project design and costings.  Areas where there is
mixed ownership will require review to ensure planned investment aligns with
Guidance on the Operation of Local Authority Housing Revenue Accounts
(HRAs) in Scotland. 
2.15. To maximise the impact of regeneration and ensure a holistic approach is taken
to improving our estates, consideration will be given to upcoming capital
investment due in an area such as roofing, rendering, windows, external doors,
kitchens, and bathrooms.  Future reports to Cabinet on the programme will
outline the total investment in an area from the EBRP budget, and report on
spend through other budgets to complement the improvement programme. 
2.16. The Scottish Government published their new Housing to 2040 strategy in
March 2021, which will see a focus on energy efficiency upgrades and installing
low carbon heating systems to decarbonise our housing stock in the coming
years.  The external advisor supporting the Council in developing a Local Heat
and Energy Efficiency Strategy (LHEES) was commissioned to undertake
research and provide a report on the solutions available and financial impact of
achieving the Energy Efficiency Standard for Social Housing (EESSH2) across
our housing stock.   
2.17. The output from this review, alongside property lifecycle data, is informing
future capital investment needs and will identify the properties where the
investment required is not economically viable and other solutions may be
preferable, such as demolition.  It will also inform future reviews of the Estate
Based Regeneration Programme. 
2.18. The investment programme will continue to be updated annually to ensure it
remains up to date and the most effective use of funding is achieved. With each
annual review, Cabinet will be asked to approve the next phase of projects in
the programme. 
2.19. The latest projected cost of the EBRP programme from 2022/23 to 2028/29 is
£9.118m against the remaining budget available of £8.822m, i.e., an overspend
of £0.296m is currently forecast. Furthermore, as noted above all projects from
2024/25 onwards still require a full scoping exercise to be undertaken and
detailed project costs determined, therefore the individual project budgets
currently noted within the programme may be subject to change. 
2.20. Given the current global financial situation and increased construction industry
inflation rates, it is likely that the original £10m budget earmarked in the HRA
Business Plan for the EBRP would be significantly exceeded if all the projects
currently identified went ahead. 
2.21. In addition to the issues noted above, it should be noted that a fundamental
review of the HRA Business Plan is currently underway to inform options for
128

Page 129

rent levels for 2023/24. This review may require a number of capital and
revenue spending plans, including the EBRP, to be revisited and reviewed. 
2.22. Recognising the lead time for fully developing projects and appointing
contractors etc, it is therefore proposed that Cabinet approves the projects
within the EBRP for 2023-24 only at this stage. The EBRP for 2024-25 and
beyond will require to be revisited as part of the fundamental review of the HRA
Business Plan, with the outcome and recommendations presented to the
Council meeting on 15 February 2023. 
Current Phase of the Programme (2022/23 to 2023/24) 
2.23. There are 13 projects included in the current phase of the EBRP, some of
which will conclude in future years.  A fencing programme and other capital
programme work will run alongside these projects and contribute to the overall
regeneration of our housing estates. 
2.24. Three previously anonymised projects in the Garnock Valley locality were
subsequently combined as a single project during 2020/21.  These were
regeneration projects 4, 5 and 6 - Laburnum Avenue in Beith, Newhouse Drive
in Kilbirnie and Baidland Avenue in Dalry.  Works commenced on site in August
2022, with works expecting to complete early 2023. 
2.25. Two projects planned to commence during the current phase, ‘Regeneration
Project 7’ and ‘Regeneration Project 9’ are confidential at this stage.  This is
because they involve major regeneration and will require consultation with
tenants, and potentially owner occupiers, prior to full plans being developed. 
Members will be consulted prior to the project being progressed. 
3. Proposals 
3.1. That Cabinet (i) notes progress on, and revisions to, the EBRP to March 2022
as noted in Appendix 1; (ii) notes the revised programme for 2022/23 to
recognise slippage in previous years; (iii) approves the detailed programme for
2023/24; and (iv) notes that the remainder of the projects in the Estate Based
Regeneration Programme scheduled for delivery in 2024/25 and beyond, as
shown in appendix 2, may be subject to revision. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Budget of £8.822m has been allocated within the Housing Revenue Account
30 Year Business Plan to fund the Estate Based Regeneration Programme
from 2022/23 to 2028/29. Budget for replacement new build provision totalling
129

Page 130

250 units through the Strategic Housing Investment Plan is also included in
the Business Plan. 
Human Resources
4.2 None 
Legal
4.3 All projects in the Estate Based Regeneration Programme will be undertaken
in line with Guidance on the Operation of Local Authority Housing Revenue
Accounts (HRAs) in Scotland.   
Equality/Socio-economic
4.4 Regenerating the estates throughout North Ayrshire will have a positive
impact for our tenants as we address areas of low demand and enhance the
external environment.  The benefits of attractive, good quality green space
and surroundings in relation to health, wellbeing, and educational attainment,
are well documented. 
Climate Change and Carbon
4.5 Investment in neighbourhoods through the Estate Based Regeneration
Programme will be carried out alongside measures developed to improve
energy efficiency and reduce carbon emissions in our housing stock, to
achieve national net zero targets.  This reflects the approach set out in the
Council’s recently approved Environmental Sustainability & Climate Change
Strategy 2021-23, which supports the Council’s sustainability aspirations to
become net-zero carbon by 2030, become a climate resilient local authority
and support enhanced biodiversity across North Ayrshire. 
Key Priorities 
4.6 The Estate Based Regeneration Programme 2022 2029 aligns with the
Council Plan strategic priorities: ‘Active and strong communities’; ‘Affordable,
modern, and well-designed homes that meets residents’ needs’: and ‘Vibrant,
welcoming and attractive places’. 
Community Wealth Building
4.7 North Ayrshire Council has integrated local economic development into all
policy decisions as part of the Community Wealth Building ethos.  As part of the
procurement process to identify contractors for works, there will be a
requirement for them to deliver agreed community benefits.  Building Services
are responsible for carrying out all fencing works identified in the programme,
adopting the Council’s Community Wealth Building ethos as practice.
130

Page 131

5. Consultation
5.1 Consultees at inception of the Estate Based Regeneration Programme included
housing professionals, corporate colleagues from across the Council, Health
and Social Care Partnership and Police Scotland.  Consultation will continue to
be undertaken with the relevant partners, as well as tenants and residents, as
projects develop. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Fiona Ellis, Senior Manager (Housing
Strategy & Development), on 01294 324031. 
Background Papers 
None
131

Page 132

Appendix 1
Estate Based Regeneration Programme 
Progress on previous years projects and those with spend during 2021/22
Project
Indicative
cost reported
to Cabinet Jan
2019
Revised
Project
Budget
following
scoping
Total Spend
Pre 2021/22
2021/22
Spend
Total Spend
to 31 March
2022
Scheme Carried
Forward to
2022/23 Onwards
Programme
(Appendix 2)
Proposed Interventions Progress
Bimson Place,
Irvine £15,000 £50,000 £0 £0 £0 Yes
Rationalise tenant garden layouts
where possible and install sub-
divisional fencing.
Consultation took place during 2021/22 with a positive response.  Budget has been increased in
the revised programme following the project being fully scoped.  Works commenced in July
2022.
Broomlands
area, Irvine £188,000 £273,624 £273,624 £0 £273,624 No
Increase parking and grounds
maintenance to replace poor
condition shrubbery which attracts
litter with turf to give the area a
more open and tidy appearance.  
380 additional parking spaces were created and landscaped around parking areas. 
Burns Street,
Irvine £195,500 £300,000 £0 £0 £0 Yes External painter work and new roofs
Project to be deferred to 2023/24.  Work is ongoing to ascertain internal reconfiguration works
required to adapt these properties to a more lettable standard. A new roof and external wall
insulation has been installed to one of the blocks as part of planned capital investment.
Castlepark
area, Irvine £100,000 £200,000 £245,590 £0 £245,590 No
Increase parking provision (minimum
150 new spaces).  Works planned for
year 2 have been brought forward to
year 1.
Works planned for both 2019/20 and 2020/21 were complete by March 2020 (total budget was
£200,000 over the two years).  125 additional parking spaces were created, and landscaping
undertaken around parking areas.
Glass Fronted
Closes, Irvine £380,000 £640,953 £0 £875 £875 Yes Upgrade close screens at nine Irvine
locations
Locations increased from nine to ten following scoping exercise. Budget has been increased in
the revised programme to reflect additional work identified.  Works were scheduled to
commence during 2021/22, however the supply of steel has caused a significant delay to this
project.  Works are scheduled to commence on site on 20 September 2022 and are expected to
complete during spring 2023.
Corsehill
Parking,
Kilwinning
£27,500 £17,229 £17,229 £0 £17,229 No Redevelop derelict ground for
parking provision Complete.  7 parking spaces were created, and perimeter fencing installed.
Dirrans,
Kilwinning £295,000 £130,000 £0 £0 £0 Yes
Upgrade fencing, provide in-curtilage
parking for tenants where feasible,
streetscape improvements
Due to the shortage of tarmac, works commenced on site in June 2022.  Budget has been
decreased in the revised programme following initial scoping.
Highfield
Street.
Kilwinning
£81,000 £5,779 £5,779 £0 £5,779 No
Remedial works to retaining wall
along the street frontage.
Scope of works was reviewed due to roads and footpaths being out with scope of HRA spend.  
Garnock Valley
Demolitions
(Regeneration
Projects 4,5,6)
£495,000 £495,000 £0 £95,975 £95,975 Yes Demolition of low demand flatted
blocks
Regeneration projects 5 and 6 were accelerated to 2021/22 to combine all three proposals as
one demolition project.  Budget information has been collated in the revised programme to
reflect this. Works commenced on site 1 August 2022.
Woodburn
Road, Beith £4,000 £0 £0 £0 £0 No Fencing improvements Fencing improvements for tenants who wished it were previously completed through the HRA
fencing programme.
Pier Crescent,
Fairlie £30,000 £12,220 £0 £12,220 £12,220 No
Increase car parking provision by
utilising grassed areas in front of
properties
Works completed during 2021/22.
132

Page 133

Appendix 1
Project
Indicative
cost reported
to Cabinet Jan
2019
Revised
Project
Budget
following
scoping
Total Spend
Pre 2021/22
2021/22
Spend
Total Spend
to 31 March
2022
Scheme Carried
Forward to
2022/23 Onwards
Programme
(Appendix 2)
Proposed Interventions Progress
Keppenburn,
Fairlie £55,000 £45,000 £0 £13,686 £13,686 Yes
Review garage occupation and
consider rationalisation of
replacement with parking provision
Works commenced 2021/22.
Moorburn
Road, Largs £77,000 £15,260 £15,260 £0 £15,260 No
Hard landscaping at rear of amenity
properties and fencing
improvements
Complete.  Cost was significantly less than the identified budget.  
Kilmahew
Street,
Ardrossan
£0 £5,977 £5,977 £0 £5,977 No
Landscaping of rear gardens, fencing,
painting closes and tidying of front
entrances
Residual works for the Kilmahew Street Project paid in 2020/21.  
Stanley Road,
Ardrossan £125,500 £27,504 £0 £27,504 £27,504 No Increase parking and upgrade fencing Following a scoping exercise and site visit parking was found to be adequate at this site. 
Fencing works complete during 2021/22.
Burns Terrace
and Chapelhill
Mount,
Ardrossan
£354,000 £124,434 £109,651 £14,783 £124,434 No
Increase parking provision including
use of under-utilised amenity areas,
and upgrade fencing
Two projects were merged from previous programme (Burns Terrace from 2020/21 and
Chapelhill Mount from 2023/24) given the proximity and to provide economies of scale.  Works
are complete, with 63 additional parking spaces provided and c.300m2 resurfacing undertaken. 
Works completed during 2021/22.
Regeneration
Project 9  £165,000 £250,000 £0 £62,400 £62,400 Yes
Buy back owner-occupied units, re-
house tenants, demolish flats and
redevelop through the SHIP
One remaining owner-occupier is unwilling to sell their property.  An options appraisal is being
prepared to consider the next steps to progress this scheme.
McNay
Crescent,
Saltcoats
£40,000 £10,810 £0 £10,810 £10,810 No Extend rear gardens to encompass
surplus land
Following scoping, the project was amended to involve landscaping the surplus land and budget
reduced to reflect this.  Works completed during 2021/22.
Regeneration
Project 13,
Stevenston
£77,000 £0 £0 £0 £0 No
Buy back owner-occupied unit and
redevelop derelict development site
through SHIP
This project focused on two derelict sites in the area, one of which has since been sold and the
other will be discussed with developing partners through the SHIP.  The project has, therefore,
been removed from the programme.
Regeneration
Project 14 £440,000 £440,000 £0 £84,277 £84,277 Yes
Buy back owner-occupied units, re-
house tenants, demolish flats and
redevelop through the SHIP
Three remaining owner-occupiers unwilling to sell their properties.  An options appraisal is
being prepared to consider the next steps to progress this scheme.
Ad hoc
Improvements £35,000* £35,000* £16,226 £6,116 £22,342 Yes Small ad-hoc parking and render
issues Minor ad hoc requests only.
Ad hoc Sub-
divisional
Fencing
£150,000* £150,000* £29,925 £68,605 £98,530 Yes Programme of fencing Minor ad hoc fencing requests only.
Management
charges N/A N/A £12,300 £42,449 £42,449 Yes N/A N/A
Total Cost £2,694,500 £2,549,127 £731,561 £439,700 £1,171,261 
*budget set as an allowance per annum for the lifetime of the EBRP to allow ad-hoc schemes to be addressed as and when required, for example, the Kilmahew Street, Ardrossan project. 
133

Page 134

Estate Based Regeneration Programme 2022-2029
Project Name 
Locality 
Town
Letting Area
Street
SIMD Decile
Issue Interventions
No of Properties
No of Tenants
%
of Tenants
Town/Village Centre
2022/23(£000)
2023/24 (£000)
2024/25 (£000)
2025/26 (£000)
2026/27 (£000)
2027/28 (£000)
2028/29 ONWARDS
(£000)
Irvine Locality                                   
Bimson Place IR
Irvine
HARB
Bimson Place 1 Rear garden sub-division
issues
Rationalise tenant garden
layouts where possible and
install sub-divisional fencing.
12 6 50%   £50,000             
Burns Street IR
Irvine
IRVC Burns St 1 Low demand flatted
blocks 
Consider options for
improving appearance and
addressing low demand stock
14 10 71%  £5,000 £195,000 £100,000        
Glass Fronted Closes, Irvine IR
Irvine
IRVN Glass fronted closes
throughout area 2
Unattractive and rotting
glass fronted close
screens
Upgrade close screens at ten
Irvine locations 36 36 100%   £640,078            
Regeneration Project 1 IR
Irvine - Confidential 1 Low demand stock Develop regeneration plan TBC TBC TBC             TBC  
Regeneration Project 2 IR
Irvine - Confidential 1 Low demand stock Develop regeneration plan TBC TBC TBC              TBC
Kilwinning Locality                                   
Dirrans area KW
Kilwinning
DIRN Dirrans, Bartonholm &
Ninians Terrace, Seymour
Avenue, Smith Crescent
2 Streetscape issues,
quality of fencing
Upgrade fencing, provide in
curtilage parking for tenants
where feasible, streetscape
improvements 
192 91 47%   £130,000            
Fergushill Road Flats KW
Kilwinning
CHIL Fergushill Rd (flats) 1
Low demand flatted
blocks, streetscape
issues, anti-social
behaviour issues
Identify programme of
improvements, including
render, lighting, bin stores and
increased parking, where
possible given ownership
ratio.
28 20 71%   £50,000 £245,000 £200,000        
Hazelgrove KW
Kilwinning
CHIL Hazelgrove 3
Insufficient parking,
roads and footpath
condition issues
Improve parking provision and
road and footpath condition,
where possible given
ownership ratio.
106 26 25%     £50,000          
Town Centre Flats (East),
Kilwinning KW
Kilwinning
KWTC
Church Street  2
Difficult to let flatted
blocks, streetscape
issues, anti-social
behaviour issues
Identify programme of
improvements, including
render, lighting, bin stores and
increased parking where
possible given ownership
ratio.
22 16 73%        £400,000 £464,500    
Town Centre Flats (West),
Kilwinning KW
Kilwinning
KWTC Byres Road and
Claremont Crescent 1
Difficult to let flatted
blocks, streetscape
issues, anti-social
behaviour issues
Identify programme of
improvements, including
render, lighting, bin stores and
increased parking where
possible given ownership
ratio.  
51 34 67%      £400,000 £295,000      
Garnock Valley Locality                                 
Appendix 2 
134

Page 135

Barrmill                                   
Regeneration Project 3 GV
Barmill
BML Confidential 6 Low demand stock  Develop regeneration plan 38 24 63%               TBC
Beith                                   
Garnock Valley
Regeneration (Formerly
Regeneration Projects 4,5 &
6)
GV GV GV Acacia Drive, Baidland
Avenue, Laburnum
Avenue, Newhouse Drive
2
Four streets with low
demand flatted
properties
Re-house tenants, demolish
flats, redevelop through SHIP
where appropriate, provide
additional parking and
landscape where appropriate
48 48 100%  £211,124 £187,901          
North Coast Locality                                   
Fairlie                                   
Keppenburn Avenue NC
Fairlie
FRLI
Keppenburn (garage site) 4 Under-occupied garage
sites, insufficient parking
Maximise parking and
upgrade fencing where
possible given ownership
ratio.
84 24 29%  £31,314            
Largs                                   
Royal Avenue / Holehouse
Court NC
Largs
LARG Royal Avenue/Holehouse
Road 4
Insufficient parking,
fencing issues, mixed
ownership blocks with
poor physical appearance
Identify programme of
improvements, including
render, lighting, bin stores and
increased parking where
possible given ownership
ratio.
78 39 50%    £300,000          
Skelmorlie                                   
Skelmorlie Parking NC
Skelmorlie
SKML
Innes Park Rd 5 Insufficient parking Maximise parking and
upgrade fencing 127 30 24%      £70,000        
West Kilbride                                   
Simson Avenue NC
West Kilbride
WKIL
Simson Ave 2
Under-occupied garage
sites, insufficient parking,
access to refuse area
Maximise parking, upgrade
fencing and consider options
for bin storage
76 52 68%   £65,000            
Three Towns Locality                                 
Ardrossan                                   
Burns Terrace & Chapelhill
Mount 3T
Ardrossan
ADSS
Burns Terrace 2 Insufficient parking and
fencing
Complete outstanding works
from 2020/21 project,
including maximise parking
and upgrade fencing
223 107 48%                
Regeneration Project 7 3T
Ardrossan
- Confidential 2
Low demand flats above
retail units, parking,
fencing
Develop regeneration plan TBC TBC TBC   £5,000 £42,500 £200,000      
Regeneration Project 8 3T
Ardrossan
- Confidential 1
Low demand flats above
retail units, parking,
fencing
Develop regeneration plan TBC TBC TBC      £185,000 £300,000    
Regeneration Project 9 3T
Ardrossan
- Confidential 1 Low demand flats  Develop regeneration plan TBC TBC TBC    £187,600          
135

Page 136

Saltcoats                                   
Regeneration Project 10 3T
Saltcoats
- Confidential 1
Blocks of low demand
flats with anti-social
behaviour issues
Develop regeneration plan TBC TBC TBC           £500,000 £693,500  
Regeneration Project 11 3T
Saltcoats
- Confidential 1
Block of low demand
flats with anti-social
behaviour issues
Develop regeneration plan TBC TBC TBC       £187,000        
Regeneration Project 12 3T
Saltcoats
- Confidential 2
Blocks of low demand
flats, flats with retail
units on ground floor
Develop regeneration plan TBC TBC TBC       £342,500 £400,000      
Stevenston                                   
Regeneration Project 14 3T
Stevenston
- Confidential 1 Low demand flats,
streetscape issues Develop regeneration plan TBC TBC TBC    £200,000 £155,723        
Regeneration Project 15 3T
Stevenston
- Confidential 2
Low demand stock, flats
with retail units on the
ground floor, anti-social
behaviour issues, lack of
amenity space
Develop regeneration plan TBC TBC TBC               TBC
All Areas                                   
Ad hoc projects All All All Various N/A Various small scale
estate based issues
Smaller scale improvement
projects identified outwith the
wider programme.
- - TBC  £35,000 £35,000 £35,000 £35,000 £35,000 £35,000 £35,000
Fencing All All All Various N/A
Estate management
issues and poor visual
appearance through lack
of fencing.
Programme of fencing
improvements to complement
the EBRP.
- - TBC  £150,000 £150,000 £150,000 £150,000 £150,000 £150,000 £150,000
Management charges N/A
N/A
N/A N/A N/A     N/A  £43,722 £45,034 £46,385 £47,777 £49,210 £50,686 £52,206          
Total pa  £1,411,238 £1,600,535 £1,729,108 £1,712,777 £1,498,710 £929,186 £237,206          
Projects
total      
Projects
total £9,118,759                 
Budget
total £8,822,155 
136

Page 137

NORTH AYRSHIRE COUNCIL 
1 November 2022 
Cabinet
Title: Rapid Rehousing Transition Plan Progress
Purpose: To provide a year three update on the implementation of the
North Ayrshire Rapid Rehousing Transition Plan, and to seek
approval for the priorities identified for year four of the plan. 
Recommendation: It is recommended that Cabinet: 
(i) considers the progress made to date in the
implementation of the Rapid Rehousing Transition Plan. 
(ii) agree the priorities set for delivering the Rapid Rehousing
Transition Plan during 2022/2023. 
1. Executive Summary 
1.1 The North Ayrshire Rapid Rehousing Transition Plan (RRTP) 2019-2024 was approved
by Cabinet in March 2019, subject to Scottish Government funding. 
1.2 Implementation of the RRTP is undertaken by a multi-agency task force chaired by the
Head of Service for Housing and Public Protection. 
1.3 There has been significant progress made in implementing the RRTP, which has
resulted in the development and implementation of a range of inter-agency initiatives. 
2. Background 
2.1 The North Ayrshire Rapid Rehousing Transition Plan was approved by Cabinet in March
2019 and following review was awarded £1.196m of Scottish Government funding to
deliver the five year plan. 
2.2 The North Ayrshire multi-agency Homelessness Task Force, chaired by the Head of
Service for Housing and Public Protection, is responsible for overseeing the
implementation of the RRTP and monitoring of the budget. 
2.3 The table below summarises the first three years’ progress in implementing the plan. 
Agenda Item 9
137

Page 138

RRTP Outcome Progress – Year 3   
We will proactively
prevent
homelessness
wherever it is
possible to do so
▪ We have increased funding to the Community Housing
Advocacy Project to support people who are at risk of
homelessness as a result of the cost-of-living crisis 
▪ We are working with private sector landlords to prevent
the incidence of homelessness on receipt of a Section
11 notification (which advises the Council of their
intention to evict a household) 
▪ We are working with Health Improvement Scotland to
understand where prevention activities could intervene
within Health systems to reduce the risk of crisis, and
subsequently homelessness
▪ We are undertaking a young persons’ housing
sustainability pilot within the Garnock Valley.  New
Council tenants under the age of 25 will be offered a
package of support to improve their independent living
skills, whilst ensuring that they understand the rights
and responsibilities of having a tenancy. The pilot was
temporarily paused as a result of COVID 19 and will
resume again by March 2023.
▪ The Violence Against Women Partnership have
undertaken a range of activities within secondary
schools to promote gender equality and to highlight the
impact of gender-based violence 
▪ We developed a robust prison discharge protocol
aligned to the national SHORE standards;
implementation was delayed as a result of the
pandemic, and has been rescheduled for delivery
during 2022/2023 
We will reduce time
spent in temporary
accommodation 
From January to March 2020, we undertook a pilot of increased
lets to homeless households within the following categories: 
• Households with children
• Households in employment
• Women experiencing violence 
During the pandemic we extended the increased lets to all
homeless households. Reducing our duration of homelessness
from 26 weeks to 23 weeks. 
We have significantly reduced the time households spent in
temporary accommodation as demonstrated below. 
Dispersed                  Hostel                                   
Accommodation        Accommodation 
Year   2019/20            109.5 days                20.7 days
Year   2020/21            102.3 days                16.6 days
Year   2021/22             93.2 days                  6.7 days   
138

Page 139

The time spent in dispersed accommodation has reduced by
15% and our time spent in hostel accommodation has reduced
by 68% since the implementation of the RRTP. 
We will reduce the
number of hostel
spaces and
prioritise the use of
dispersed
accommodation
▪ We have reduced Hostel Accommodation in North
Ayrshire by 53 bed spaces by closing both Green Street
Hostel and Victoria House
▪ We worked in partnership with Women’s Aid to reduce
shared refuge accommodation in both Irvine and
Kilbirnie, replacing them with dispersed accommodation 
▪ We increased our level of dispersed temporary
accommodation to accommodate the closure of both
hostels, and in response to increased demand as a
result of COVID-19.  There is a lower rate of turnover in
dispersed furnished accommodation than within hostel
provision. It is therefore necessary to create a higher
level of dispersed accommodation to facilitate hostel
rooms being closed   
We have committed to reducing our dispersed temporary
accommodation to 115 units by year 5 of the RRTP. We
currently have 240 units of dispersed accommodation and due
to the level of demand, have not been able to reduce
accommodation levels. We are focusing our resources on
prevention and early intervention initiatives in an effort to
reduce homelessness. Success of these initiatives will enable
us to further reduce levels of temporary accommodation
provision. 
We will implement
Housing First for our
most complex
disadvantaged
service users. 
Target by the end of
year 3: 
60 Housing First
Tenancies
Working across the Community Planning Partnership, we aim
to break the cycle of homelessness for people with the
multiple and complex needs of addictions, mental health
issues and offending behaviour by increasing the number of
Housing First tenancies available. 
▪ An interagency team has been developed to deliver a
coordinated response to support the above client
group to sustain their mainstream accommodation and
improve their life outcomes, including the objectives as
detailed within our RRTP  
▪ We had committed within the RRTP to set up 20
Housing First tenancies in Year 3, taking us to a total
of 60. We have exceeded this target and reached 62
by the end of 2021/2022
▪ During Year 3, we identified 22 Housing First clients
utilising the criteria detailed within the RRTP and
furnished all 22 tenancies at a cost of £77,000, using
the funding made available from Scottish Government
for this purpose. 
Resources aligned to Housing First:
139

Page 140

▪ During 2021/2022 we created an additional Support
Worker post as a resource to meet the demands of the
increased caseload 
▪ We have an agreement in place to consolidate the five
years’ funding provided by Scottish Government for the
RRTP to maximise our opportunity to deliver on the full
commitments as detailed within our RRTP 
▪ We have completed recruitment of the specialist
Mental Health and Addiction posts within the specialist
Housing First Team 
▪ We have procured a specialist 3rd sector advocacy
and peer support service for our Housing First clients
which focusses on both addictions and mental health. 
This contract commenced on 13th December 2021
▪ We have a dedicated resource within the Housing First
Team providing advice and support to people who are
at risk of homelessness from within Scottish prisons,
identifying people who meet the criteria for Housing
First on discharge and liaising with the integrated
Housing First Support team to manage the transition
between prison and Housing First Tenancy
▪ We continue to support Riverside Homes, who were
awarded Scottish Government funding to enable them
to provide Housing First support for families.  The
project which commenced in June 2021 currently
provides direct support to 20 families with children,
who are struggling to maintain their tenancy, or who
have previously been through the homeless system 
▪ We continue to focus on prison discharge as the main
route into Housing First to try and break the link
between homelessness and criminal activity
(incarceration). As a result, 64% of the people being
supported by the Housing First model come from a
prison setting 
Impact
We have resettled and supported 48 males (average age 36)
and 14 females (average age of 36) into Housing First
tenancies.  All 62 households had previously been known to
Homeless Services. 
Our Housing First tenancy sustainment success rate is as
follows: 
• Year 1 (2019/2020) 67% 
• Year 2 (2020/2021) 91% 
• Year 3 (2021/2022) 92% 
140

Page 141

We recognise that the ongoing improvement is as a direct
result of the integrated approach adopted as we have brought
on more specialist provision. 
In addition, we undertook a review after year one to identify
learning. This resulted in a range of work being undertaken
with partner agencies to ensure we had a community
planning understanding of and response to Housing First.
This included: 
▪ Work undertaken with the Safer North Ayrshire
Partnership, who now have Housing First included
within the Safer North Ayrshire Strategy
▪ Training with local housing teams to expand their
knowledge and understanding of both the Housing
First programme and the support services available
where issues arise
▪ We worked in partnership with Police Scotland (locality
teams) to develop a shared understanding of the
outcomes to be achieved; this informed our joint
approach as issues arise on an individual basis
▪ We undertook training with the antisocial behaviour
team to ensure that we responded jointly when
negative behaviour became apparent, with a focus on
resolving arising issues as opposed to enforcement
action
▪ By involving the Health and Social Care Partnership
and NHS Ayrshire and Arran in the Housing First
Team, we have successfully communicated the needs
of this client group across our health partners.
▪ Work was undertaken with Scottish Fire and Rescue
which resulted in the undertaking of Fire Safety
assessments within every Housing First tenancy
▪ We work alongside voluntary organisations ensuring
they are cognisant with the programme; this has
resulted in their support in providing both services and
goods as required
▪ The North Ayrshire food bank provides vouchers for
our Housing First tenants
▪ The latest service recruited into the Housing First
programme is Turning Point Scotland who offer a Peer
Support service for our Housing First tenants.  The
service works in tandem with the existing Prevention
Early Intervention and Recovery (PEAR) delivered by
Addiction services 
141

Page 142

We will shift funding
towards flexible
floating Housing
Support services
▪ We have successfully integrated the Housing Support
Service previously provided by Barnardo’s with the
North Ayrshire Housing Support Service, ensuring a
focused and consistent approach to the delivery of
services in line with both the RRTP and the Local
Housing Strategy 
▪ The Health and Social Care Partnership have provided
funding in kind by way of specialist training for the
Housing First Support Workers 
2.4 The table below details the emerging priorities for year four of the RRTP.   
RRTP outcome Priorities – Year 4   
We will proactively
prevent
homelessness
wherever it is
possible to do so
▪ We will implement the prison discharge protocol to
reduce the risk of homelessness on discharge
▪ We will work with partners to review and update the
hospital discharge protocols to ensure people are not
homeless on discharge
▪ We will finalise the review of the throughcare protocol to
ensure young people leaving care have pathways into
housing and therefore do not become homeless
▪ We will consider emerging best practice and review how
we deliver services to reduce the risk of homelessness
through prevention and early intervention
▪ We will maximise tenancy sustainment by ensuring that
new and existing tenants have access to the support
they require
▪ We will continue to work with partners to reduce the
incidence of domestic violence 
We will reduce time
spent in temporary
accommodation
▪ We will continue to monitor the time spent in temporary
accommodation and will review the factors which impact
on the duration 
We will reduce the
level of dispersed
accommodation
▪ We will reduce temporary dispersed accommodation by
10 units by the end of year 5 of the plan
We will implement
Housing First for our
most complex
disadvantaged
service users
▪ We will increase the number of Housing First
Tenancies created to 80
▪ We will increase the support provision by recruiting
one additional Housing First Support Officer post
(funded by the Scottish Government RRTP funding via
the Ending Homelessness Together Fund)
We will shift funding
towards flexible
floating Housing
Support services
▪ This objective has been met as detailed within the table
above at 2.3 
142

Page 143

3. Proposals 
3.1 It is proposed that Cabinet: 
(i) considers the significant progress made to date in implementing the North Ayrshire
RRTP, as detailed at para 2.3; and
(ii) approves the year 4 priorities as detailed at para 2.4 of this paper. 
4. Implications/Socio-economic Duty
Financial
4.1 The RRTP is funded by the Scottish Government on an annual basis via the Ending
Homelessness together fund.
Any reduction in the number of dispersed furnished flats will result in a reduction in
rental income which will require to be offset by reduced expenditure across the service. 
Human Resources 
4.2 The majority of Housing First resources to date have been provided within existing
housing budgets, as we have realigned staffing resources to focus on this work.
Support provision will be increased with the appointment of an additional Housing First
Support Officer post (funded via the Scottish Government Ending Homelessness
Together Fund). 
Legal 
4.3 The Council has a statutory responsibility to prevent and alleviate homelessness. The
implementation of the Rapid Rehousing Transition Plan assists with the delivery of this
duty. 
Equality/Socio-economic 
4.4 The expansion of homeless prevention activities reduces the risk of crisis for
households in the most socially deprived demographic. The Housing First programme
works to support people with complex needs back into training and employment,
reducing the dependence on welfare benefits and improving life outcomes. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The Housing First element of the RRTP supports the Council priority ‘North Ayrshire
residents and communities are safe’ by breaking the cycle of homelessness and
criminal behaviour, working to support households with complex issues to engage with
support and wider service provision. It also supports the Council priority ‘North
Ayrshire has an inclusive, growing and enterprising economy’ as it works to engage
vulnerable people with training, education and employment opportunities.
143

Page 144

The RRTP supports the Council priority ‘North Ayrshire’s residents and communities
enjoy good life-long health and well-being’ as it works to tackle inequality, ensuring
vulnerable people have access to services, employment opportunities and housing. It
also supports the Council priority ‘North Ayrshire has homes that meet our residents’
needs as it works to deliver sustainable housing outcomes which meet people’s needs
and aspirations. 
Community Wealth Building 
4.7  None. 
5. Consultation 
5.1 A range of consultation has been undertaken with service users, staff and partners via
Homeless Network Scotland and Health Improvement Scotland and directly with the
Scottish Government to inform the RRTP priorities. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Janeine Barrett, Senior Manager (Homelessness
and Community Safety) on 01294 314600 
Background Papers 
1  - North Ayrshire Rapid Rehousing Transition Plan 2019 -2024
144

Page 145

NORTH AYRSHIRE COUNCIL 
1 November 2022 
Cabinet
Title:  Roads Winter Service and Weather Emergencies Plan
2022/23
Purpose: To seek approval from Cabinet for the Roads Winter Service
and Weather Emergencies Plan 2022/23.
Recommendation: That Cabinet (a) approves the Roads Winter Service and
Weather Emergencies Plan 2022/23 and (b) notes the
preparations and developments contained in the Winter
Preparation Action Plan. 
1. Executive Summary 
1.1 North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over public roads which
by definition includes carriageways, footways, footpaths, pedestrian precincts, etc. 
1.2 The Council is also responsible for the management and operation of the coastal flood
protection controls at Largs and Saltcoats. The Council will close the flood gates on the
promenades and erect the flood barriers at Largs Pier in advance of predicted severe
weather with minimum disruption to promenade users and the Largs to Cumbrae ferry.
Coastal flooding can occur at any time and, accordingly, the Council provides this
service throughout the year. 
1.3 A review of the Council's Winter & Weather Emergencies Service was undertaken over
the summer months. The 2022/23 Winter Preparation Action Plan has been developed
to ensure adequate preparations and effective arrangements are in place for 2022/23.
The Winter Preparation Action Plan is included at Appendix 1. 
1.4  The Roads Winter Service and Weather Emergencies Plan 2022/23 is contained at
Appendix 2. 
2. Background 
2.1 In its statutory role as the local Roads Authority, the aim of North Ayrshire Council in
respect of its winter service and weather emergencies is to: 
•  provide a standard of service on public roads which will permit safe movement of
vehicular and pedestrian traffic appropriate to the prevailing weather conditions.
•  establish a pattern of working which will keep delays, diversions, or road closures
to a minimum during adverse weather conditions.
•  conduct operations having regard to the requirements of the Health & Safety at
Work Act 1974 and any other relevant enactments. 
2.2  Separately, the Trunk Road Network is the responsibility of Transport Scotland and
their management contractor, Amey. The Trunk Road network includes the A78, the
Agenda Item 10
145

Page 146

A737 from Kilwinning to the Renfrewshire Boundary and A738 from the Pennyburn
Roundabout to the A737 Dalry Road, Kilwinning. 
2.3  All winter gritting and snow clearing operations on the Trunk Road Network are the
responsibility of Amey. The Council’s Roads Team do however liaise on a regular basis
with the trunk road operator during periods of adverse weather in order to provide the
best possible seamless service to the travelling public. 
2.4  The Council’s current updated Winter Preparation Action Plan 2022/23 highlights a
number of key areas where preparation arrangements are being reviewed and
refreshed: 
•  Salt supply resilience, storage and capacity
• Resilience arrangements
•  Grit bins/community resilience 
2.5 Whilst the Council's primary focus is on our Priority Network, our communities have an
expectation of wider assistance during extreme weather, for example in and around
schools, in residential streets, car parking areas etc. There are approximately 500 grit
bins provided on the road network. Salt is also available from a number of supply points
throughout the Council area. Details of planned winter treatments are posted on the
Council’s website. In addition, details of disruption to the road network caused by
adverse weather are also posted on the website. In periods of severe weather Elected
Members are also provided with regular service updates. 
2.6 The Council’s gritting routes have been developed from thermal mapping of the road
network. Thermal mapping is a process by which the variation of minimum night-time
road surface temperature is measured, and this provides the temperature relationship
across the whole network, identifying those sections of the road which are likely to
freeze first. Thermal Mapping identifies colder roads and enables selective targeting of
those areas in need of treatment. While our gritting routes are unchanged for this winter
the de-trunked section of the now de-trunked section of the A737 through Dalry has
been added to the Council’s gritting routes. Details of each Priority route are provided
on the Council’s web pages at: http://www.north-ayrshire.gov.uk/roads-and-
travel/winter-gritting.aspx   
2.7  A total of 65% of the road network will receive planned treatments. The remaining 35%
of the road network, comprising of minor rural and residential roads, is covered by
Priority 3 routes. All routes will continue to be monitored and reviewed over the winter
period and amended where necessary. 
2.8  Priority 1 routes will be treated on receipt of an adverse weather forecast as detailed in
the decision-making matrix contained in Appendix C of the Winter Service and Weather
Emergencies Plan 2022/23. 
2.9  Priority 2 routes will be treated in addition to Priority 1 routes when sub-zero
temperatures are forecast to extend beyond midday and will be treated following
completion of Priority 1 routes. Generally, the treatment of Priority 2 routes will
commence at 8.00am however appropriate treatment may be instructed at any time
depending on conditions. 
2.10  Priority 3 routes will generally only be treated following severe weather or when sub-
zero conditions are forecast to continue over an extended period. They will be treated
as resources permit only after all Priority 1 and Priority 2 routes are clear unless
identified as an emergency. 
146

Page 147

2.11 Operational resources from Commercial Services (Roads) and Streetscene will be
provided for the Winter and Weather Emergencies Service. The stand-by period for
carriageway treatments will be 20 October 2022 until 13 April 2023. This period may be
extended beyond the given dates if required. These arrangements include home stand-
by which is activated by the designated Winter Supervisor when instructed by the
Winter Controller or as the result of hazardous road conditions being reported.
Arrangements have also been made with Streetscene to assist with the treatment of
priority footways over the winter season and stand-by arrangements are also in place
with Streetscene to treat footways when necessary, at weekends from 19 November
2022 through to 5 February 2023 and over the festive holiday period. Generally, the
treatment of footways will commence at 8.00am. 
2.12  Last winter season, which was generally a mild winter the Service used approximately
5,014 tonnes of salt treating the road network, compared to approximately 8,153 tonnes
of salt during the winter of 2020/21. A total of 7,000 tonnes of salt will be stored at our
Goldcraigs Depot and 2400 tonnes at our Market Road depot on Arran, complying with
the salt stock levels agreed with the West of Scotland Regional Resilience Partnership
(WoSRRP). In addition, salt will be distributed to Streetscene Depots to assist with the
treatment of footways. Salt usage will be monitored weekly and stocks will be
augmented if necessary. 
2.13  The role of communities to provide their own resilience is recognised and grit bins will
be replenished to allow communities to self-help during periods of adverse weather
within available resources over the winter period. 
2.14  Similar to last winter, winter treatment decisions and any road closures due to adverse
weather will be provided on the Council’s website. 
2.15  A pre-winter planning meeting was held on 30 September 2022 with Managers from
across Council Services. This meeting was held to ensure Services are taking the
necessary steps to prepare for the severities of winter weather. 
2.16  A planning exercise known as the ‘dry run’ was carried out on 7 October 2022 to check
our readiness for the forthcoming winter season. 
2.17  The weather stations on the A760 at Catburn, between Largs and Kilbirnie, and on the
B880 String Road, Arran have been serviced and calibrated and will assist Winter
Controllers and Supervisors in monitoring weather conditions. Cameras are fitted on
the weather stations and images from the these are available to members of the public
through the Council’s website. 
2.18 Each year, a Winter Preparation Action Plan is created to ensure adequate and
appropriate arrangements are being put in place for the forthcoming winter. The
2022/23 Action Plan detailed at Appendix 1 confirms all planned actions are either
complete or are on target. 
2.19 A minimum resilience network has been developed should we face resourcing
challenges similar to those experienced due to the pandemic. 
3. Proposals 
3.1  Cabinet is asked to approve the Roads Winter Service and Weather Emergencies Plan
2022/23 and note the preparations undertaken as detailed in the attached 2022/23
Winter Preparation Action Plan.  
147

Page 148

4. Implications/Socio-economic Duty
Financial
4.1 A budget of £0.510m has been allocated for the delivery of the Roads Winter Service
and Weather Emergencies Plan 2022/23. 
Human Resources 
4.2 The Winter Service and Weather Emergencies Plan will be delivered within existing
resources. 
Legal 
4.3 The Council has a statutory obligation under Section 34 of the Roads (Scotland) Act
1984 "to take such steps as they consider reasonable to prevent snow and ice
endangering the safe passage of pedestrians and vehicles over public roads". 
Equality/Socio-economic 
4.4 The delivery of the Winter Service maintains accessibility to our towns and
communities and supports social and economic activity. 
Climate Change and Carbon 
4.5 This report provides details of operational arrangements in place for responding to
Climate and related weather emergency incidents. There are no carbon issues arising
directly as a result of this report. 
Key Priorities 
4.6 Delivery of the winter service supports the Council Plan priority of keeping North
Ayrshire residents safe. 
Community Wealth Building 
4.7 Delivery of the Winter and Weather Emergencies Service supports Community
Wealth Building by maintaining a resilient road network enabling access to
employment and movement of goods and services. 
5 Consultation 
5.1 Consultation regarding preparations for the forthcoming winter season and the
development of the Winter Action Plan was undertaken with The Ayrshire Civil
Contingencies Team, Transport, Streetscene, Waste Services, Communications,
Customer Services, North Ayrshire Health and Social Care Partnership, Education,
Housing, Criminal Justice, suppliers, and external organisations 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Commercial Services
on 01294 324570.
148

Page 149

Background Papers
Appendix 1 – Winter Preparation Action Plan 2022-23
Appendix 2 – Winter Service 2022-23
149

Page 150

1
Appendix 1 
CCOOMMMMEERRCCIIAALL  SSEERRVVIICCEESS  --  22002222//2233  WWIINNTTEERR  PPRREEPPAARRAATTIIOONN  AACCTTIIOONN  PPLLAANN   
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
1.0 Policies, Procedures
& Guidance    
1.1 Review Existing Policy
and Procedures
document
Winter and Weather Emergencies
Procedures and Resources Document
reviewed on annual basis. 
Review annually after each
Winter Period.
September 
2022
Complete      
2.0 Review of Existing
Winter Maintenance
Operations    
2.1 Existing Priority Gritting
Routes
Priority 1 routes cover 44% of the
network, Priority 2 routes cover 21%
of the network.   
No changes proposed, review
annually.
September
2022  Complete
2.2  Non-Priority Routes Priority 3 routes are treated following
an extended cold spell or following
severe weather. 
No changes.  September
2022 
Complete 
2.3 Footway Gritting Formal arrangement with Streetscene
for assisting with reactive delivery of
the winter service. 
Review annually. No changes
proposed. 
September
2022
Complete
2.4  Assistance from outside
parties
Formal arrangement in place with
local contractors and farmers to assist
in the event of extreme weather
conditions. 
Review annually.  Arrangements
made for a contractor to provide
Gritting on Cumbrae for this
winter.
September
2022
Complete
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
2.5 Gritting of other Council
locations
Education and Housing have
arrangements in place with
Streetscene and Community Justice
for assistance with snow clearing and
gritting. 
Review arrangements annually.
No changes proposed. 
September
2022 
Complete 
150

Page 151

2
2.6 Network Resilience Resilience network developed should
drivers be depleted in extreme
situations (eg. The Pandemic)  
Mutual aid arrangements established
with neighbouring authorities. 
Review annually  October
2022
Complete      
3.0 Winter Gritting Fleet    
3.1 Winter Gritting Fleet The gritting fleet comprise 13 No. 18
tonne Econ Uni-Bodies and 1 No 7.5
Tonne Econ Uni-Bodies and 1 Trailer
Gritter. 
Vehicles to be serviced and gritter
units to be calibrated. 
September
2022
Complete      
4.0 Operational Controls    
4.1 Weather forecast
provision
The Council’s weather forecast
service is currently procured by
means of a collaborative contract with
12 other Local Authorities in the South
West of Scotland. 
Contract was awarded to DTN, for
4 years + 2 year extension option,
commencing September 2017. 
Contract extended to September
2023.
September
2022
Complete
4.2 Ice Prediction methods North Ayrshire Council has two
weather stations installed on the road
network and has access to a further
two weather stations in the Council
area, provided by Transport Scotland,
on the trunk road network. We also
have access to a number of additional
weather stations on our neighbouring
authorities’ road network. 
Stations to be serviced and
calibrated for start of winter
season. 
September
2022  Complete
151

Page 152

3
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
4.3 Winter Gritting Records Records of winter instructions and
operations recorded on Vaisala
Manager - Winter Roads Management
System. Record footway treatments
undertaken.
Continue to record roads winter
actions on Vaisala Manager -
Winter Roads Management
System. 
September
2022  Complete
4.4 Business Continuity The provision of Winter and Weather
Emergencies Procedures and
Resources document is included
within the Business Continuity Plan. 
Review Business Continuity Plan. Review
Annually  Complete     
5.0 Salt    
5.1 Salt Storage Ensure salt stock complies with
Scottish Government resilience levels
prior to the onset of the winter season. 
7000 Tonnes of salt to be stored
at Goldcraigs Depot and 2400
tonnes to be stored on Arran for
start of winter season. 
Review
Annually  Complete
5.2 Salt Distribution Procedure implemented for salt
distribution throughout Council
Services in place at Depot.
Review and ensure all staff are
aware of procedures annually.
Review
Annually  Complete      
6.0 Communication    
6.1 Information available to
Members, Council
Services, general public
and other stakeholders
Weather forecasts and winter
decisions distributed across Services. 
Roads winter gritting decision posted
on Council Website. 
Details of any road closures due to
adverse weather posted on Website. 
Issue information to Locality
Planning Partnerships. 
Continue to provide information
on the Council website. 
Monitor effectiveness of
information provided on the
Council website. 
Promote Roads Winter Service
during Customer Services Week
and Are You Ready for Winter
campaign.
Oct/Nov
2022 
Review
Annually 
Review
Annually 
Oct/Nov
2022
On target 
Complete 
On target 
On target 
152

Page 153

4     
7.0 Measuring
Performance    
7.1 Monitor performance of
winter actions
Performance is currently measured
using APSE Performance indicators
which measure efficiency in relation to
documented procedures. 
Review annually. October
2022
On target
7.2 Monitor performance on
individual routes
Gritting routes optimised following
thermal mapping exercise undertaken
during winter season 2018/19.
No changes proposed, review
annually.
September
2022
Complete
7.3 Improve efficiency of
gritting operations
Winter decisions are made based on
thermal mapping exercise carried out
during winter 2018/19. 
No changes proposed, review
annually.
September
2022
Complete      
8.0 Training    
8.1 Winter Service Training Staff trained in delivery of winter
service. 
Identify training needs of
personnel involved with the
provision of the winter
maintenance service.  Arrange
appropriate training. 
Review
Annually 
Complete 
8.2 Severe Weather
Exercise
Ayrshire Local Resilience Partnership
arranged a Severe Weather tabletop
exercise in September 2018.
Appropriate attendance at ALRP
exercises as arranged.
September
2022
Complete      
9.0 Health & Safety    
9.1 Toolbox Talks Toolbox talks are delivered to all
personnel engaged in the delivery of
the winter maintenance service.
Review annually and provide
toolbox talk at the start of each
winter.
Annually Complete 
153

Page 154

APPENDIX 2 
Commercial Services 
Roads Winter Service
and
Weather Emergencies Plan 
2022 – 2023 
Cunninghame House
IRVINE
Ayrshire KA12 8EE
Tel:      01294-310000
154

Page 155

1 | P a g e
CONTENTS  
Page No 
1. Introduction 2       
2. Priorities for Winter Treatment 3
3. Organisation 5
4. North Ayrshire Council Resources (Roads) 6      
5. Other Resources 7
6. Weather Forecasting 8
7. Decision Making 8
8. Ice Prediction 9
9. Road Condition Reports 9
10. Communications 9
11. Road Closures 10
12. Liaison with the Police 10
13 ALRP Disruptive Weather Response Arrangements 11
14. Cross Boundary Arrangements 11
15. Vehicle Routes 11
16. Precautionary Salting 12
17. Grit Bins 12
18. Largs and Saltcoats Flood Prevention Schemes 12
19. Sandbag Procedures 12 
Appendix A - Priority1 Carriageway Gritting Routes
Appendix B - Level of Service
Appendix C - Decision Making        
Appendix D  - Summary of Available Labour & Plant       
Appendix E - Community Grit Bins        
Appendix F - Summary of Available Materials
Appendix G - Salt Resilience
Appendix H  - Contacts Arrangements 
Appendix I - Distribution List
Appendix J - Bridges with weight or height restrictions
Appendix K  - Arrangements with other Authorities
Appendix L - Grit Bin Policy and Procedure 
Appendix M - Resilience Network           
155

Page 156

2 | P a g e
1. INTRODUCTION 
North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow
and ice endangering the safe passage of pedestrians and vehicles over public
roads which by definition includes carriageways, footways, footpaths, pedestrian
precincts, etc.   
In its statutory role as the local Roads Authority, the aim of North Ayrshire Council
in respect of its winter service and weather emergencies is to:- 
(i) provide a standard of service on public roads which will permit safe
movement of vehicular and pedestrian traffic appropriate to the prevailing
weather conditions. 
(ii) establish a pattern of working which will keep delays, diversions, or road
closures to a minimum during adverse weather conditions. 
(iii) conduct operations having regard to the requirements of the Health & Safety
at Work Act 1974 and any other relevant enactments. 
This Plan only relates to the Council’s duties as Roads Authority and does not cover
the wider response of the Council during winter and other weather emergencies. 
North Ayrshire Council has no responsibility for the treatment of trunk roads.  From
1st April 2001, the contract for management and maintenance of the trunk roads in
Scotland has been awarded by the Scottish Government to the private sector.  The
successful contractor for the South West of Scotland is Amey and the roads
involved in North Ayrshire are as follows:- 
A78 full length from Meadowhead roundabout, Dundonald to Inverclyde boundary
at Skelmorlie. 
A737 Dalry Road, Kilwinning to Renfrewshire boundary. 
A738 Pennyburn roundabout to A737 Dalry Road, Kilwinning 
All winter gritting and snow clearing operations on these roads will be the
responsibility of Amey. North Ayrshire Council’s Commercial Services (Roads) and
Amey liaise on a regular basis during periods of adverse weather in order to provide
the best possible service to the travelling public. 
North Ayrshire Council is also responsible for the management and operation of the
coastal flood protection controls at Largs and Saltcoats. The Council will close the
flood gates on the promenade and erect the flood barriers at Largs Pier in advance
of predicted severe weather with minimum disruption to promenade users and the
Largs to Cumbrae ferry.  Coastal flooding can occur at any time and, accordingly,
the Council will provide this service throughout the year. 
In the event of extreme weather similar to that which was experienced on Arran late
March 2013 where major disruption affects large parts of the community, a
coordinated response is adopted by the Council to ensure public safety.  In dealing
156

Page 157

3 | P a g e
with such emergencies, the Police initially lead the emergency or response stage of
the emergency. Thereafter, the Council leads the recovery stage. Generally, there
are 3 levels of Civil Contingencies response. There is a strategic group at National
or Strathclyde wide level, a tactical group at North Ayrshire level and an operational
group at local level. 
The Ayrshire Civil Contingencies Team (ACCT) act as lead for the Council and
implement the Civil Contingencies Plan liaising with all relevant Stakeholders
identified within the Plan. 
2. PRIORITIES FOR WINTER TREATMENT 
North Ayrshire Council has defined the priorities for carriageway and 
footway/footpath treatment as follows: 
2.1.1 Carriageway Priorities 
Where slush is formed, this shall be removed as soon as practicable to avoid the
risk of rutting should there be a further significant fall in road temperatures which
might result in freezing conditions. 
2.1.2 Carriageway Routes for Proactive Treatment 
Priority 1 – Strategic, Main Distributor and Distributor routes, bus routes and
certain pre-determined Secondary Distributor routes identified from the Local
Transport Strategy (LTS) will be treated when it is forecast that snow or ice is likely
to be present on road surfaces. 
Due to the various climatic domains within North Ayrshire the Priority 1 routes may
be adjusted to cover either the four pre-determined Inland Routes or two pre-
determined High Routes which all currently form part of our existing Priority
Network. 
Priority 1 gritting routes are available on the Council website (See Appendix A). 
2.1.3 Carriageway Routes for Reactive Treatment 
a) Priority 2 – Remaining Secondary Distributor, local access and residential
distributor roads. 
Given the presence of ice and snow Priority 2 routes may be treated during normal
working hours as resources permit when sub-zero temperatures are forecast to
continue beyond midday following completion of Priority 1 routes. 
b) Priority 3 – The remaining road network including minor rural unclassified routes
and remaining residential areas not already covered 
Priority 3 routes will be treated as resources permit when sub-zero conditions are
forecast to continue over an extended period only after all Priority 1 and Priority 2
routes are clear unless it is identified as an emergency.
157

Page 158

4 | P a g e
2.1.4 Carriageway Routes for Snow Clearance 
On receipt of a weather warning predicting medium (25 - 100 mm deep) or heavy
(over 100 mm deep) snowfalls, the Senior Manager (Network) where appropriate,
will recall to depots such vehicles capable of being equipped with snowploughs. 
While snow is still falling the Strategic and Main Distributor Network will be
prioritised for ploughing and treatment in order to target resources and to keep
these routes open for traffic. 
After snow has stopped falling but is lying, the remaining Priority 1 precautionary
routes will be ploughed and treated before commencing ploughing and treatment on
Priority 2 and Priority 3 routes as resources and conditions permit. 
2.1.5 Cumbrae 
There are no Roads Operatives based on the Isle of Cumbrae, however contract
arrangements have been made to carry out gritting operations on the Island.   
2.2 Footway/Footpath Priorities 
With limited resources available footways and footpaths will only be treated when
considered necessary (e.g. heavy snowfall or extensive icing).    They will normally
only be treated during normal working hours (commencing from 8:00am), but
arrangements are in place to undertake emergency work out of normal working
hours, weekends and public holidays in extreme circumstances. 
Generally, treatment of footways and footpaths will be reactionary and not pre-
planned, and where possible work will be undertaken during normal working hours. 
When treatment is instructed the following priorities will apply:- 
Priority 1 Routes will be considered for treatment if it is forecast that ice or snow is 
likely to be present or where surfaces are wet with temperatures forecast to 
remain below zero until 10:00am the next working day. 
Priority 1 Routes - Urban shopping areas and precincts, footway access to 
schools, emergency facilities including fire and rescue, 
police and ambulance services, hospitals, sheltered    
housing, doctors surgeries and health centres etc; 
Priority 2 routes will be treated if it is forecast that ice or snow is likely to be present
with temperatures forecast to remain below zero for a prolonged period only after
priority 1 routes are clear. 
Priority 2 Routes -  Steep hills on main distributor and residential distributor routes,  
routes to bus stops etc, only after all Priority 1 have been 
cleared; 
158

Page 159

5 | P a g e
Priority 3 routes will be treated if it is forecast that ice or snow is likely to be present
with temperatures forecast to remain below zero for a prolonged period only after
priority 1 and 2 routes are clear. 
Priority 3 Routes - Other areas of high pedestrian concentration. 
Streetscene staff will assist with the treatment of footways. 
In order to maximise coverage on footways, generally only one side of a road will be
initially treated. 
It is not possible for the Council to treat all footways and footpaths within North
Ayrshire.  As such the Council encourages the community to participate in self help,
through the use of grit bins which can be requested through the grit bin application
process.  Grit bins will only be allocated where it has been assessed and deemed
as an appropriate location by the Council. 
2.3 Cycle Routes 
With limited manpower resources no treatment will be carried out on off road 
cycle routes. 
2.4 Response and Treatment Times 
Routine precautionary salting of priority 1 carriageway routes should be completed 
within 3 hours of the planned start time. For emergency or unplanned salting the 
start time from leaving the depot shall be no more than 1 hour.   
3. ORGANISATION 
The Head of Commercial Services is responsible for specifying the level of winter
service required based on approval from the Council.  The Senior Manager
(Network) is responsible for implementing this service. 
A duty Winter Controller and Winter Supervisor will be appointed by the Senior
Manager (Network) for the whole of the winter period covered by these procedures
(mid-October to early April)
159

Page 160

6 | P a g e
4. NORTH AYRSHIRE COUNCIL RESOURCES (ROADS) 
4.1 General 
Following approval from the Council, it is the responsibility of the Head of
Commercial Services to define the level of service to be provided within their sphere
of operations and to issue appropriate instructions to the Senior Manager (Network)
to provide the necessary labour and plant for winter operations.  This level of
service will be based on the national Code of Practice for Well Manahed Highway
Infrastructure (see Appendix B). 
The level of winter treatment is established utilizing the weather forecasts provided
by DTN in accordance with the winter treatment matrix (Appendix C). 
The Senior Manager (Network) shall thereafter be responsible for advising the Head
of Service of any matters which may affect his ability to deal with adverse weather
conditions e.g. labour disputes, extensive plant breakdowns etc. 
Labour resources from Commercial Services (Roads) will be provided for the Winter
and Weather Emergencies Service. The stand-by period will be 20th October 2022
until 13th April 2023. This period may be extended beyond the given dates if
conditions warrant such action. These arrangements include home stand-by which
is activated by the designated Winter Supervisor when instructed by the Winter
Controller or as the result of hazardous road conditions being reported.  
4.2 Labour 
A proportion of the roads labour force will be on stand-by for winter service
operations out of normal working hours, with the remainder on call out as
necessary. This allows evening and early morning precautionary salting to be
carried out on our priority carriageway network to treat dangerous roads before the
morning rush hour.   
In determining the labour resources required for the winter service, cognisance is
taken of the key objective to treat all priority routes before the commencement of
the morning peak period. 
4.3 Vehicle Plant and Equipment 
Prior to commencement of winter service operations, the Senior Manager (Network)
will ensure that all equipment for salting roads and snow clearing is in working order
and, where appropriate, that ancillary items can be fitted to vehicles without
difficulty, e.g. ploughs set up on blocks to facilitate assembly.  The above procedure
should also be applied to vehicles and plant available under contract for the winter
service. 
The Senior Manager (Network) will ensure that all vehicles engaged in the winter
service are equipped with radios or other appropriate communication devices to
allow contact to be maintained between the depot and operators. Superintendents
have mobile telephones. There is also vehicle tracking system fitted and operational
in all vehicles to reduce the risk associated with gritting operations. 
160

Page 161

7 | P a g e
A summary of labour, vehicles, plant, and equipment available for the winter service
work is detailed in Appendix D. 
Once per year the Senior Manager (Network), will organise a trial closure of the
flood gates and erection of the de-mountable barriers at the Largs and Saltcoats
flood protection controls.  This is to ensure that the gates and barriers remain in full
working order and that all staff are familiar with the process. 
4.4 Salt 
Salt is purchased through a Scotland Excel annual purchase contract. Mainland salt
deliveries are stored in the salt barn within the Goldcraigs Depot. Salt on Arran is
stored in the open at the Roads Depot in Market Road, Brodick.  
During the season, the Senior Manager (Network) will arrange for a weekly check to
be made on the amount of salt used and for stocks to be augmented as necessary. 
There is a procedure in place at the depot to strictly control salt distribution. All
vehicles are tagged and must cross the weighbridge to accurately record salt
usage. This includes salt distributed to Streetscene and contractors assisting with
winter service delivery. 
Small quantities of salt are available for issue free of charge to the public, subject to
residents supplying a suitable container. Details of locations of community grit bins
where small quantities of salt are available are given in Appendix E 
The planned salt stock level at commencement of winter is given in Appendix F. 
In the event of prolonged severe weather, the Council has a salt resilience plan
(Appendix G), which will be implemented if conditions require. 
5. OTHER RESOURCES 
During adverse weather conditions, the Senior Manager (Network), (after
consultation with the Head of Commercial Services), shall, if necessary, augment
his resources by the use of personnel from Streetscene and external contractors at
rates agreed prior to engagement through a framework contract.  The Head of
Commercial Services should be advised, as soon as practicable, of external
resources engaged as a result of decisions made outwith normal working hours. 
The Senior Manager (Network) will provide a supply of salt to Streetscene and
external contractors where appropriate to permit the treatment of agreed
footways/footpaths.  This will be managed through a salt management system
based at Goldcraigs Roads Depot. 
161

Page 162

8 | P a g e
6. WEATHER FORECASTING 
North Ayrshire Council, through a collaborative contract led by South Lanarkshire
Council, has appointed DTN, as their weather forecast provider.  During the winter
service period DTN will provide a weather forecasting service and monitor road and
weather conditions.  
The forecasters receive, monitor and interpret, climatic, ice prediction and weather
radar information on a continuous basis and provide detailed weather forecasts on
a daily basis during the whole winter period. 
SEPA operate a coastal flood warning system for the Firth of Clyde.  If storm surges
and coastal flooding are predicted, SEPA provide advance warning to the Council
by e-mail and also through their Floodline service which is available on their website
or by phone.  This service is available all year round. 
7. DECISION MAKING 
The Senior Manager (Network) will appoint suitably trained and experienced
personnel as Winter Controllers. 
During the winter season the Winter Controller will receive the weather forecast
around 12.00 hours and decide on the treatment to be carried out. The Winter
Controller will check the treatment decision of neighbouring authorities for
consistency and reconsider if necessary. The weather forecast provider will provide
an evening forecast around 18.00 hours and if this update indicates any change in
the forecast the Winter Controller will amend the decision accordingly and advise
the Winter Supervisor. 
For out of office hours, Saturdays, Sundays and public holidays the Senior Manager
(Network) shall provide the weather forecast provider with contact telephone
numbers of the on duty Winter Controller. If the forecast conditions change from
good to adverse at any time, then the weather forecast provider will phone the
Winter Controller either at work or at home as appropriate. Thereafter, it is the
responsibility of the Winter Controller to take action including the calling out of
stand-by squads to undertake salting/snow clearing. 
Winter Controllers have the facility at any time to contact the weather forecast
provider for advice or clarification of forecasts. These arrangements will be in place
from 6 October 2022 until 13 April 2023 and these dates can be extended if
required. 
The decision making process is illustrated in Appendices B & C. 
The Head of Commercial Services will appoint suitably trained staff and
experienced personnel to manage the coastal flood prevention schemes at Largs
and Saltcoats.  During the winter season, this will be the Winter Controller. 
162

Page 163

9 | P a g e
8. ICE PREDICTION 
In addition to the weather forecast information, the Council has available further
information from sensors which have been installed at the locations listed below:- 
• A78 Ardrossan
• A737 Highfield
• A760 Catburn
• A735 Near Dunlop
• B880 Arran, summit of The String 
The sensors provide current details of road and air temperatures and indicate the
presence of moisture, thereby identifying locations that icing has occurred or where
there is a risk that icing will occur. 
By utilising the data from these sensors the weather forecast provider is able to
supplement their forecast by producing site specific forecasts. The above
information is available to the Winter Controller via computer link 24 hours a day
throughout the winter period. 
9. ROAD CONDITION REPORTS 
During periods of adverse weather, the Senior Manager (Network) shall receive
reports on road conditions from the Winter Supervisor by 09.45 hours. These
reports should be updated as necessary depending on changing circumstances. 
10. COMMUNICATIONS 
The Head of Commercial Services or nominated senior manager will deal with
statements to the Press, Radio and Television regarding road conditions throughout
the area.  The Council’s Communication team will assist, and may take the lead role
depending on the nature of any significant event. 
General advice and information, along with timeous service updates, will be placed
on the Council’s website. 
The Head of Commercial Services (or nominated senior officer) will ensure that all
staff involved in communication with members of the public are fully briefed with
consistent and accurate information. 
A protocol has been agreed by the West of Scotland Regional Resilience
Partnership (WoS RRP) and Ayrshire Civil Contingencies Team (ACCT) for the
transfer of information in relation to Winter and Weather Emergencies. 
The Council’s daily winter decisions are available for the public and can be
accessed via the Council’s website.  Any winter and weather emergencies can be
reported to North Ayrshire Council and the Trunk Road Operators using the contact
information contained within Appendix H. 
The distribution list for winter weather emergencies can be found under Appendix I. 
163

Page 164

10 | P a g e
11. ROAD CLOSURES 
Where it is considered that a road is rendered unsafe due to adverse winter
conditions then the Police or persons acting on behalf of the Chief Constable will
arrange to have the road closed and advise the on-duty Winter Supervisor as soon
as possible of their actions. The Winter Supervisor will advise the Winter
Controller/Senior Manager (Network) of any road closures. Appropriate measures
will also be taken to re-direct traffic and to ensure that the necessary signs are put
in place.  When the road affected is a through route the adjoining Councils will be
kept informed.  Police will advise the other emergency services (Ambulance & Fire)
of the closures. 
Prior to signing diversionary routes, the capacity of the roads and the headroom
and weight restrictions of structures should be checked with the Winter Controller to
ensure that they are adequate (see Appendix J). 
12. LIAISON WITH THE POLICE 
Commercial Services (Roads) will ensure close liaison with the Police, particularly
during periods of severe weather. 
Where practicable, the Police will be informed in advance of North Ayrshire
Council’s proposed operations. Similarly, arrangements have been made for
exchanging information on proposed actions with neighbouring authorities and the
trunk road operating company. 
Where necessary the service will request appropriate assistance from the Police
when moving equipment, arranging road closures, and dealing with abandoned
vehicles. 
Reports from the Police regarding dangerous road conditions should be acted upon
by the Winter Supervisor as soon as practicable, having regard to priorities in this
document and the conditions pertaining throughout the area. 
164

Page 165

11 | P a g e
13. AYRSHIRE LOCAL RESILIENCE PARTNERSHIP (ALRP) DISRUPTIVE
WEATHER RESPONSE ARRANGEMENTS 
There have been a number of occasions when severe weather including high
winds, heavy rain and snow has caused disruption to communities and services in
Ayrshire. Arrangements are in place where partner organisations can trigger the
ALRP Disruptive Weather Response Arrangements. The purpose of these
arrangements are:- 
• To protect human life, property, and the environment
• To implement a professional and co-ordinated multi-agency response to the
incident in conjunction with our communities
• To maintain wider public confidence in the multi-agency response and
minimise general community and infrastructure impact
• To ensuring that all possible measures are in place to protect vulnerable or
displaced members of the community
• To supporting effective public communication in regard to the incident along
the principles of warning and informing
• To ensure awareness of the potential impact of events out with Ayrshire on
the local multi-agency response
• To ensuring that organisational and partnership learning points are captured
to ensure a continuing focus on safeguarding the public 
14. CROSS BOUNDARY ARRANGEMENTS 
Because the Council boundaries do not always coincide with convenient turning
points at the end of gritting routes, arrangements have been drawn up with all
adjacent authorities for the gritting routes to be continued short distances to
appropriate turning points. See (Appendix K). 
15. VEHICLE ROUTES 
A thermal mapping exercise was undertaken on North Ayrshire’s road network over
winter season 2018/19 and routes have been developed by the Roads Service on
the basis of the priorities listed in Section 2.  However, in order to minimise
unproductive mileage, some roads in a lower category may be treated out of
sequence.  This may also occur when conditions vary throughout the area. 
A complete set of route cards will be kept in the Commercial Services (Roads)
offices, with a duplicate set being held in Goldcraigs Depot. 
Treatment of precautionary carriageway salting routes should be completed within
three hours of planned start time under routine conditions. When the Winter
Controller instructs immediate winter service operations, the response time to start
treatment should be within one hour. 
It should be noted that gritting routes are either at or close to capacity and it is
unlikely that any additions to routes could be considered without additional finance
and human resources. 
165

Page 166

12 | P a g e
16. PRECAUTIONARY SALTING 
On receipt, within normal working hours, of a forecast from the weather forecast
provider warning of frost, freezing or snow conditions, the Winter Controller in
consultation with the Senior Manager (Network), shall give consideration to
precautionary salting of main roads. 
Where such a warning is received out with normal working hours, the Winter
Controller has delegated authority to activate call-out procedures as indicated in
Section 7. 
Extensive and accurate records of weather forecasts, winter treatment decisions
and actions taken will be kept to demonstrate our compliance to our Winter and
Weather Emergencies Plan. 
17. GRIT BINS 
There are approximately 500 grit bins distributed across North Ayrshire. These are
located at areas of particular difficulty e.g. dangerous bends, steep gradients etc.
The policy and procedures for siting of grit bins, and requests for additional bins is
shown in Appendix L. 
Grit bins will be refilled prior to the start of winter and as considered necessary
during the winter season and following periods of severe weather when resources
are available.   
The locations of Community Grit Bins are listed in Appendix E. 
18. LARGS AND SALTCOATS FLOOD PROTECTION SCHEMES 
On receipt of a severe weather warning predicting a combination of strong winds,
high tides or tidal surges the Winter Controller will, when necessary, instruct the
closure of the flood gates on the promenade at Largs and/or the erection of the
flood barriers at the Largs Pier and/or Saltcoats promenade. 
19. SANDBAG PROCEDURES 
The deployment of sandbags to prevent or contain floodwaters can be an effective
way of mitigating the effect of a flood, however the lead time for filling and
deployment can be lengthy, as a large number of bags cannot be filled in advance
due to storage problems. Therefore, an early decision must be taken to sandbag, to
avoid a subsequent waste of time and effort. The deployment of sandbags will be
decided with regard to the following priorities: 
1. To prevent loss of life or serious injury 
2. Maintenance of access for the emergency services 
3. Protection of vital facilities within the community 
4. Protection of transportation routes 
5. Protection of NAC property 
6. Protection of private dwelling houses 
166

Page 167

13 | P a g e
The decision to deploy sandbags will be made by the Winter Controller / Supervisor
or appropriate officers in Building Services, Cleansing or the Island Officer on Arran
in accordance with the Services' callout/emergency procedures. 
Notes: 
1. Sandbags will not normally be deployed to protect commercial property;
2. Appropriate stocks of empty and filled sandbags will be held by the Services
mentioned above, based on previous usage and experience. 
The above procedure mainly relates to tidal, fluvial and watercourse flooding. 
Where flooding occurs as a result of a blocked, damaged or ineffective Council
owned drainage systems, sandbags will be deployed as required to mitigate the
effects of flooding (and reduce the likelihood of claims against the Council) including
the protection of commercial property. 
20. Resilience Arrangements 
In critical situations should our operational resources be reduced, a minimum
resilience network for winter gritting has been prepared. Should we have to reduce
our level of service due to an extreme situation our priority gritting routes will reduce
from 6 to 3. On Arran we may require reducing from 2 to I gritting vehicle covering
the island routes and the treatment time for gritting operations will increase
accordingly. 
The Head of Service will decide if the level of service has to be reduced due to
extreme situations. 
Details of our resilience network are attached as Appendix M. 
167

Page 168

14 | P a g e
Appendix A 
Priority 1 Carriageway Gritting Routes 
Policy & Procedure 
Priority 1 Gritting Routes can be viewed on the Councils website using the following
address:- 
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx 
168

Page 169

15 | P a g e
Appendix B 
LEVEL OF SERVICE 
Road Surface
Temperature
Precipitation Predicted Road Conditions  
Wet Wet Patches Dry 
Temperature
Forecast 
between
+1.5oC
And +0.5oC 
No Rain
No Hoar Frost
No Fog 
High Route Patrols  No action likely 
Temperature
Forecast 
below +0.5oC 
No Rain
No Hoar Frost
No Fog 
(Priority  1 Routes) 
Salt before frost  Expected
Hoar Frost
Expected Fog 
Expected rain
BEFORE
freezing 
(Priority  1 Routes) 
Salt after rain stops 
Expected rain
DURING
freezing
(Priority  1 Routes) 
Salt before frost, as required during rain and after
rain stops 
Possible rain
Possible hoar
frost
Possible fog
(Priority  1 Routes) 
Salt before frost 
Monitor
weather
conditions 
Expected Snow Fall
(Priority  1 Routes and footways) 
Salt before snow fall 
The decision to undertake precautionary treatments should be adjusted, where
appropriate, to take account of residual salt. 
All decisions should be evidence based, recorded and continuously monitored and
reviewed. 
169

Page 170

16 | P a g e
Appendix C 
DECISION MAKING 
Rate of spread for precautionary treatments may be adjusted to take account of local
variations along the routes such as residual salt, temperature variations, surface moisture
(air or road surface) road alignment and traffic density. 
All decisions should be evidence based, recorded and require continuous monitoring and
review. 
Ice refers to all ice on the road surface, including black ice. 
The level of service generally complies with the recommendations laid down in “NWSRG 
best practice guide for Winter Salt” as recommended in the Well Managed Highway 
Infrastructure Code of Practice and takes account of recommendations by the SCOTS
Winter Group following a review of the Code of Practice and consultation with the National
Winter Service research Group (NWSRG). 
WINTER TREATMENT SPREAD RATE MATRIX 
Recommended Spread Rates – Dry Salting (g/m2) 
Road Surface Temperature
(RST) when frost/ice is
predicted and road wetness.
Poor Cover
(salt stored 
uncovered) 
Medium Traffic 
Normal Loss
Good Cover
(salt stored 
under cover) 
Medium
Traffic 
Normal Loss 
Comments
RST at or above -2 deg and dry
or damp road conditions  10  10 
RST at or above -2 deg and 
wet road conditions  15  10 
RST below -2 deg and above - 5
deg and dry or damp road
conditions 
(15 or 20)  (10 or 15)
Spread rate dependent on 
residual salt on road surface
RST below -2 deg and above - 5
deg and wet road conditions
(1 x 20 & monitor
& treat as
required) 
20 
RST at or below -5 deg and 
above -10 deg and dry or 
damp road conditions
(1 x 20 & monitor
& treat as
required) 
20
Spread rate dependent on 
residual salt on road surface
RST at or below -5 deg and 
above -10 deg and wet road 
conditions
(1 x 20 & monitor
& treat as
required)
(1 x 20 &
monitor & treat
as required) 
170

Page 171

17 | P a g e
Salt Type
Precautionary
Treatments Before
Snow or Freezing
rain  
Light or Medium
Traffic Heavy Traffic    
Dry Salt
Light Snow Forecast
20g/m2 20g/m2
Pre-wet
Salt 20g/m2 20g/m2
Treated
Salt 15g/m2 15g/m2
Dry Salt
Moderate/Heavy
Snow Forecast
20g/m2 40g/m2
Pre-wet
Salt 20g/m2 40g/m2
Treated
Salt 15g/m2 30g/m2
Dry Salt
Freezing rain
Forecast
1 x20g/m2 then monitor
Pre-wet
Salt 1 x20g/m2 then monitor
Treated
Salt 1 x15g/m2 then monitor   
171

Page 172

18 | P a g e
Appendix D 
SUMMARY OF AVAILABLE LABOUR & PLANT 
TYPE OF PLANT  GOLDCRAIGS  ARRAN  OTHER
NAC 
TOTAL
Gritters 
18 Tonne Uni-body 10 3  13
7.5 Tonne Uni-body 1 0  1
Trailer Gritter 0 0 1 1
Footway Gritter  1 1 7 9
Lorries 
18 Tonne Uni-body
26 Tonne Multilift
10
1
3
0
13
1
7.5 Tonne Uni-body 1 0  1
Loading Shovel 1 0  1
JCB 2CX 0 1  1
Telehandler  0 1  2 
Ploughs 
Fixed V 3 2  5     
Large Blade 15 3  18 
LABOUR    
Drivers 
Operatives 
22
11
6
3
7
36
35
50
Other Equipment    
Muck Truck + plough
(For footways)  
2 2     
Note   
When necessary labour, vehicles, plant and equipment from other 
Council Departments, farmers, plant hirers and contractors will be used 
to supplement above resources. 
This also applies for non-winter related emergency responses.
172

Page 173

19 | P a g e
Appendix E 
COMMUNITY GRIT BINS 
Small quantities of salt are available for issue free of charge to members of the public,
subject to their supplying a suitable container from the Community Grit Bins sited at the
following locations. 
Town Location
Ardrossan Carpark, North Crescent Road.
Beith Community Centre, Kings Road.
Brodick Household Waste Recycling Centre
Dalry Car Park, Kirk Close.
Fairlie Car Park, Pier Road. 
Irvine Bartonholm Civic Amenity Site.
Kilbirnie Cleansing Depot, Paddockholm Road.
Kilwinning Byrehill Place (off Pennyburn Road)
Lamlash Council Office
Largs Cleansing Depot, Alexander Avenue.
Millport Kepple Pier
Saltcoats Cleansing Depot, Mid Dykes Road.
Skelmorlie Toward View (opposite Fire Station).
Stevenston Car Park, Garnock Road.
West Kilbride Community Centre, Corse Street. 
173

Page 174

20 | P a g e
Appendix F 
SUMMARY OF AVAILABLE MATERIALS 
The following salt, grit and sand stocks will be in place at commencement of winter:- 
DEPOT TONNAGE
SALT
TONNAGE SAND 
(for Sandbags) 
Goldcraigs  (salt barn) 7000  100 
Arran  2400 300 
Cumbrae   20 (500 filled sandbags) 
Approximately 4000 sandbags are located at Goldcraigs, and 500 on Arran.
174

Page 175

21 | P a g e
Appendix G 
Salt Resilience Plan (Mainland) 
Level  1 (Green) Service – Stock Levels 2500 Tonnes and above 
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 470T – resilience 5 days                                                      
or
• Typical daily salt usage (frost & ice only) 235T – resilience 10 days 
Level  2 (Amber 1) Service – Stock Levels 1800 Tonnes – 2500Tonnes 
• Only Priority 1 carriageway routes treated with pure salt, remaining priority carriageway
routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 330T – resilience 2 days.                                                    
or
• Typical daily salt usage (frost & ice only) 165T – resilience 4 days 
Level  3 (Amber 2) Service – Stock Levels 1000 Tonnes – 1800 Tonnes 
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix at 50/50
• Typical daily salt usage (snow conditions) 150T – resilience 5 days.
or
• Typical daily salt usage (frost & ice only) 75T – resilience 10 days 
Level 4 (Red) Service – Stock Levels less than 1000Tonnes 
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at 50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 100T – resilience 10 days
or
• Typical daily salt usage (frost & ice only) 50T – resilience 20 days 
Assuming 7000 tonnes in stock at start of winter our total resilience would be either 
• Total Resilience during periods of heavy snow - 27 days
or
Total Resilience during periods of frost & ice conditions - 54 days 
175

Page 176

22 | P a g e
Salt Resilience Plan (Arran) 
Level  1 (Green) Service – Stock Levels 1000 Tonnes and above 
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 52T – resilience 10 days                                                      
or
• Typical daily salt usage (frost & ice only) 26T – resilience 20 days 
Level  2 (Amber 1) Service – Stock Levels 550 Tonnes – 1000Tonnes 
• Only Priority 1 carriageway routes treated with pure salt, remaining priority carriageway
routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 44T – resilience 10 days.                                                      
or
• Typical daily salt usage (frost & ice only) 22T – resilience 20 days 
Level  3 (Amber 2) Service – Stock Levels 250 Tonnes – 550 Tonnes 
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50
• Typical daily salt usage (snow conditions) 30T – resilience 10 days.
or
• Typical daily salt usage (frost & ice only) 15T – resilience 20 days 
Level  4  (Red) Service – Stock Levels less than 250 Tonnes 
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at 50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 20T – resilience 12 days
or
• Typical daily salt usage (frost & ice only) 10T – resilience 25 days 
Assuming 1,900 tonnes in stock at start of winter our total resilience would be either 
• Total Resilience during periods of heavy snow  - 49 days
or
Total Resilience during periods of frost & ice conditions - 98 days 
176

Page 177

23 | P a g e
Appendix H 
NORTH AYRSHIRE COUNCIL 
CONTACT ADDRESS & TELEPHONE NUMBERS 
During Normal Working Hours  Outwith Normal Working Hours 
MAINLAND 
Commercial Services
(Roads) 
Cunninghame House
IRVINE
KA12 8EE 
Tel:  01294-310000 
NORTH AYRSHIRE COUNCIL
CALL CENTRE 
Road & Lighting Faults 
24 hours, 7 days per week 
Tel:   01294 310000 
ARRAN 
Arran Local Office
Lamlash
Isle of Arran
KA27 8JY 
Tel:  01770-600338
Fax: 01770-600028 
TRUNK ROADS
A78, A737 & A738 
Amey
Network Control Centre
150 Polmadie Road
Glasgow
G5 OHD 
Control Room
0800 042 0188
OCCR-southwest@amey.co.uk 
177

Page 178

24 | P a g e
Appendix I 
DISTRIBUTION LIST 
Copies 
North Ayrshire Council
Chief Executive
Executive Director: Place 1
Executive Director: Communities 1 
Head of Commercial Services 1
Head of Physical Environment
Head of Democratic Services 1
ACCT 1
All Elected Members of North Ayrshire Council    33 
Police Scotland
Divisional Commander, Kilmarnock    1
Traffic Management, Ayr    1 
Strathclyde Partnership for Transport    1 
Scottish Fire & Rescue Service – Divisional Commander     1 
Scottish Ambulance Service    1 
DTN    1 
Amey    1 
Ayrshire Roads Alliance     1   
Renfrewshire Council - Head of Roads    1 
East Renfrewshire Council – Head of Roads & Planning    1 
Inverclyde Council – Head of Transportation & Roads Service    1 
Contact Centre, Building Services, Stevenston    1 
Contact Centre, Bridgegate House, Irvine    1 
178

Page 179

25 | P a g e
Appendix J 
BRIDGES WITH WEIGHT OR HEIGHT RESTRICTIONS 
HEIGHT RESTRICTIONS 
Bridge Location Grid Reference Signed Height  
Metric Imperial
B714/50 : Dalry, Railway Bridge 229960  649702 3.8 12’ – 6”
B706/40 : Barrmill 236834  651392 4.0 13’ – 0”
B7047/10 : Meadowfoot Road, West Kilbride 220791  647032 4.6 15’ – 0”
C6/10 : West Balgray 235333  642491 3.9 12’ – 9”
C26/10 : South Kilruskin 220541  650473 4.4 14’ – 6”
C26/20 : North Kilruskin 220423  650868 5.0 16’ – 6”
U67/10 : Dubbs 228508  642006 3.0 9’ – 9”
U67(A78 280) : Todhill (Dubbs Road, under
A78, Kilwinning Bypass)
229175  642250 4.0 13’ – 0”
U67/30 : Nethermains 230059  642199 3.7 12’ – 0”
C56/30 : Moor Road 220639  652980 4.7 15’ – 6”
C67/20 : Tandelhill 238174  651683 4.4 14’ – 3”
C99/20 : Cockenzie 230694  646241 3.0 10’ – 0”
Unc.TG/230 : Garnock View, Glengarnock 231875  653191 3.8 12’ – 6”
Unc.TI/70 : Old Church Street, Irvine 213571  638800 4.0 13’ – 3” 
WEIGHT RESTRICTIONS 
Bridge Location Grid Reference Signed Weight 
B781/30 : West Kilbride, Dalry Road 221015  649062 7.5T
C129/20 : Floors, north of Kilmaurs 240866  641921 17T
C99/30 : Dusk Bridge, near Dalry 230599  646882 7.5T
Unc.TL/30 : Largs, May Street 220711  658602 7.5T
U16/10 : Dalgarven Mill Bridge, north of
Kilwinning, (formerly Unc.NC/30)
229571  645847 26T
U23 : Fairliecrevoch Bridge, Perceton, Irvine 236065  642011 3T
Unc.NT/10 : Barrmill 236472  650997 3T
U54/30 : Sevenacres Mill Bridge, Kilwinning 233123  643810 18T 
179

Page 180

26 | P a g e
Appendix K 
ARRANGEMENTS WITH OTHER AUTHORITIES 
ROADS TO BE TREATED BY
ADJACENT AUTHORITIES 
ROADS TO BE TREATED BY
NORTH AYRSHIRE COUNCIL 
Ayrshire Roads Alliance (East
Ayrshire) 
A71 – from boundary westwards to
Corsehill roundabout. 
A735 – that section within North
Ayrshire boundary. 
B769 – from boundary south
westwards to Chapeltoun junction. 
C129 – that section within North
Ayrshire boundary. 
C20 – that section within North
Ayrshire boundary. 
B706 - from boundary to A736 
C117 From Chapeltoun Bridge to
Wheatrig Bridge 
South Ayrshire 
U107 from the South Ayrshire Council
boundary at the railway bridge to A759
Auchengate Interchange. 
East Ayrshire 
A736 – from Caldwell Bridge southwards to
Lugton. 
A736 – from B778 junction south
eastwards to Torranyard. 
C24 - from Greenhill Terrace, Knockentiber
to boundary at Plann Bridge. 
C126 From Montgreenan Bridge to North
Lodge. 
Knockentiber Road from boundary near
Springside to junction with C24 
Roads to be Treated by Ayrshire
Roads Alliance (South Ayrshire) 
B730 from the North Ayrshire Council
boundary at the railway bridge south of
Drybridge to junction Shewalton Road,
Drybridge. 
Renfrewshire Council 
A760 – from boundary to Kerse Road
junction, 
Kerse Road – from boundary to A760
junction 
Note:  There are no cross boundary arrangements with East Renfrewshire Council.
180

Page 181

27 | P a g e
Appendix L 
GRIT BIN POLICY & PROCEDURE 
1. North Ayrshire Council shall provide grit bins for self-help by members of the public.
These shall be sited locally in accordance with this policy. 
2. Grit bins shall only be located where the following criteria are met: - 
• The location is not on a precautionary carriageway route;
• The gradient is greater than 1 in 10, or at a junction with a known history of
accidents;
• The location shall not obstruct the passage of pedestrians, a minimum of 1.5m
clearance on the footway is required;
• The location shall not obstruct sight lines;
• The location is not within 200m of another grit bin location;
• The location is within an urban area;
• The location is within the boundary of the public road. Infrastructure and Design will
not provide grit bins in private areas or car parks for internal use by either the
Council or any other public or private property such as schools, parks, hospitals, old
people’s homes, etc. unless a service level agreement is in place. 
3. Grit bins will only be located where they can be filled from a lorry. The grit bins shall be
replenished at the start of the winter period and on a monthly cycle during the winter
period, as resources permit. 
4. Grit bins will generally be left in place during the summer months unless there is a
history of vandalism at a particular location. 
5. The location of grit bins will be recorded in an electronic database, which will be made
available on the North Ayrshire Council website. 
6. Only written requests on the Council’s Grit Bin Application Form will be considered,
these are available from the Head of Commercial Services, Cunninghame House,
Irvine, KA12 8EE, and on the Council’s website. 
7. A request will not be accepted unless a location to site the grit bin has been agreed.
Therefore, even if the criterion for locating a grit bin is met, a grit bin will not be
provided if the adjacent residents cannot agree a position. The signed agreement of
adjacent residents must be must be included on the submitted application form,
otherwise the application will not be considered. 
8. Grit Bin Application forms are available on the Council’s website at 
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx 
181

Page 182

28 | P a g e
Appendix M 
COVID Resilience Network 
182

Page 183

NORTH AYRSHIRE COUNCIL 
1 November 2022 
Cabinet 
Title:    I3 – Sale of Land at Strategic Investment Campus 
Purpose:  To approve the proposal for the sale of 2 acres of land at the
Strategic Investment Campus, i3, Irvine, subject to appropriate
conditions . 
Recommendation:  
That Cabinet:
a) approves the proposal for the sale of 2 acres of land to
System Five Off Site Ltd at the Strategic Investment Campus
at I3 Irvine; and,
b) notes that appropriate related conditions to the sale and deed
of conditions would be prepared and that the final sale price
would be negotiated in conjunction with the Council’s Estates
and Legal Teams. 
1. Executive Summary 
1.1 This report considers the request by a local company to purchase 2 acres of land at
the Strategic Investment Campus (SIC) at i3 in Irvine. 
1.2 System Five Off Site Limited is a company established by local company RDK
Construction Ltd who require land for the development of a new factory unit for the
construction of modular accommodation.  The sale of land would proceed at a market
value outlined in paragraph 2.11 below, and the company has estimated that 11 jobs
would be created initially. 
2. Background 
2.1 NAC purchased the SIC from Scottish Enterprise in 2015. The site has an overall area
of 205 acres (83 ha) with a 600m long spine road dissecting the site into northern and
southern areas.  The site has previously benefited from c.£7M investment in access,
site services and platforming by the former Irvine Bay Regeneration Company.  The
SIC has the potential to accommodate major inward investment enquiries.   
2.2 The wider ambitions and strategy for the site are currently being developed through
the preparation of a site masterplan, which is at an advanced stage of development,
and a strategic framework, which will accompany the masterplan, setting out strategic
aspirations for the site (including those related to the i3 Ayrshire Growth Deal projects,
such as the Digital Process Manufacturing Centre (DPMC), advanced manufacturing
Agenda Item 11
183

Page 184

flexible units and the digital infrastructure programme). In addition, a feasibility study
will be completed for a solar farm and wind proposal on the southern part of the site.  
The masterplan will be considered by Planning Committee, however the use proposed
in this paper aligns with the content of the masterplan to date and is a use that is
supported in the adopted Local Development Plan (LDP2). 
Site Proposals 
2.3 Land owned by NAC and Scottish Enterprise at i3, has been marketed for
development or sale previously, with signs erected by Irvine Bay remaining in place. 
Specific marketing signage related to the AGD proposals and the SIC site will be
installed and begin to be promoted during 2022/23.  Interest has been expressed in
the purchase and development of 2 acres of land by System Five Off Site Limited, a
company established by local company RDK Construction Ltd.  Appendix 1`shows the
proposed location of the site area in red. 
2.4 System Five’s proposals would see the creation of an off-site manufacturing facility for
the production of modular buildings and panelised timber components that will supply
residential, commercial and leisure projects, comprising of two purpose-built buildings.
One building of 450m2 in size will accommodate machining and manufacturing
processes and the second building will accommodate associated administration,
management, design and a research and development team and will be 140m2 in
size.  The company estimates that 11 new jobs will be created initially with
approximately 22 by year three, as well as protecting existing jobs and offering new
training opportunities. The facility would focus on creating near zero energy buildings
and would supply RDK Construction Ltd who currently have pipeline projects in North
Ayrshire. 
2.5 RDK Construction’s business activity was previously housed at Sharphill Industrial
Estate, Saltcoats. The majority of the land was sold to Cunninghame Housing
Association who recently submitted a PAN for the site in April 2022. Part of the area
has been retained by Robert Ryan Homes Ltd (the same owners of RDK
Construction) and has planning consent for commercial development. However, RDK
Construction has advised that they now consider that the site is not suitable for their
proposal, in relation to its levels and costs involved to address this, or suitable for their
growth ambitions. They are currently running a small operation from Ardeer, but are
keen to have a bespoke, purpose-built manufacturing facility, hence the interest in i3. 
Whilst the business is new, they have advised that they have sustained five new jobs
over the past 18 months or so and have just finished their first order involving 5
modular holiday accommodation units to be located in Millport. 
2.6 The proposals have been successful in securing grant funding support from Scottish
Enterprise to the total sum of £135,000 and this requires to be committed by 31 March
2023 and is based on a capital spend of £457,000 and 11 new jobs The company has
explored sites in North Ayrshire to expand their activities and are seeking to secure
the proposed site at i3. 
Context 
2.7 In terms of the principle of development and purchase of the land, the land is allocated
for employment use.  A draft masterplan was prepared to set out the likely location of
the AGD investment across i3 which indicated development proposals north of the
184

Page 185

spine road. In terms of its location to the west of the SIC site and south of the main
development area and as it’s a relatively small area, the subject land would not impact
on any future proposals for AGD flexible space, the solar farm proposal, or major
investment enquiries. In the case of the solar farm, this has been confirmed with the
Sustainability Team. The site would occupy a small area of land immediately west of
an existing sub-station and close to the entrance to the SIC and there are no
proposals to build in this area as part of the i3 draft masterplan. 
2.8 The development of the land would help to start opening up the SIC alongside future
phases of commercial space, increasing its attractiveness to other interested parties.
The design and appearance of the facility and its operations would be subject to the
planning process and any related conditions. 
Land Value 
2.9 In considering an agreement to the sale of land, external advice has been received on
the gross value of the land, and site investigations undertaken to inform a net land
value.  The valuation indicates a gross value of c.£60,000 per acre, producing a value
of £120,000.  However, site investigations have indicated that the site contains a
significant volume of fill material that cannot accommodate development foundations
and the material requires to be excavated and replaced with appropriate fill material. 
2.10 Quotes have been provided by the proposed purchaser for the excavation and
removal of soil from the site, the importing of clean stone and compact / roll in 300mm
layers and the provision of a geotextile membrane over the clean stone area.  These
quotes averaged at a cost of £230,000 which significantly impacts on the net
achievable value and has led to a negative land value.  The rates for this work have
been checked by the PMI team who have advised that generally they are comparable
but excavation and disposal rates seem slightly higher and there may be scope to
reduce. However, any reduction is still likely to result in a negative land value.  The
company has indicated that they are likely to have other site development costs in
relation to services. 
2.11 A residual appraisal was also undertaken which produces an amount that may be paid
by a hypothetical developer of the scheme for the undeveloped land. This
recommended a market value of £20,000, based on a net value of £10,000 per acre.
In this respect the Council would seek to negotiate with the company regarding a net
value of £20,000. 
3. Proposals 
3.1 It is proposed that Cabinet: 
That Cabinet:
a) approves the proposal for the sale of 2 acres of land to System Five Off Site Ltd
at the Strategic Investment Campus at I3 Irvine; and,
b) notes that appropriate related conditions to the sale and deed of conditions would
be prepared and that the final sale price would be negotiated in conjunction with
the Council’s Estates and Legal Teams 
185

Page 186

4. Implications/Socio-economic Duty 
Financial 
4.1 The Council’s Estates Team has advised that a sale at the market value of £20,000 is
appropriate. 
Human Resources 
4.2 None. 
Legal 
4.3 The sale of the land would be subject to appropriate legal conditions (including
Standard Security Clawback provisions) and the purchaser would be responsible for
securing statutory consents and service connections. Prior to the sale of this first area
of land, the rights and obligations of any owners within the completed development of
the larger site needs to be determined.  This should include provisions relating to
matters such as – access, connections to services, maintenance of shared areas such
as roads and lighting (prior to adoption), grass verges and trees. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 The sale would support the expansion of a local business that is seeking to
manufacture sustainable construction products.   
Key Priorities 
4.6 The proposal will contribute to the early development of the Strategic Investment
Campus and is unlikely to impact detrimentally on the attractiveness of the site for
future development and investment proposals. 
Community Wealth Building 
4.7 The proposal supports community wealth building through use of land and property
and supporting local business and employment. 
5. Consultation 
5.1 Consultation has taken place with the Council’s Estates, Legal, Sustainability, Planning
and Business Development Teams. 
Karen Yeomans, Russell McCutcheon
Director of Growth & Investment, Executive Director of Place 
186

Page 187

For further information please contact Marnie Ritchie, Regeneration Manager, Growth &
Investment, on 07342 713 349. 
Background Papers
0
187

Page 188

APPENDIX 1: Proposed site location 
188

Page 189

APPENDIX 2: Proposed Site Layout Plan 
189

Page 190

190