Page 1

NORTH AYRSHIRE COUNCIL 
27 September 2022 
Cabinet 
Title:    Revenue Budget 2022/23 : Financial Performance to 31 July
2022 
Purpose:  To advise Cabinet of the financial performance for the Council
at 31 July 2022. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) approve the earmarking of £0.486m identified at 2.5 to
meet future year commitments;
(c)  note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; 
(d)  approve the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2022/23 were approved by Council on 2
March 2022. The Housing Revenue Account (HRA) Revenue Budget for 2022/23 was
approved by Council on 16 February 2022. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the first report for 2022/23 and covers the period to the end of July 2022
(Period 4). Projections have been made to the year-end. 
1.3   At Period 4 the General Fund is forecasting a net breakeven position after transferring
resources from earmarked reserves. In particular, the sum of £1.644m in respect of
anticipated increases in contractual and non-contractual energy and fuel costs,
earmarked as part of the 2021-22 closure of accounts, has been transferred to
address the additional costs. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£1.219m),
(2.2%). 
1.5  The Health and Social Care Partnership is projecting a year-end underspend of
(£0.389m), (0.1%), for 2022/23. The Council services element is reporting a projected
underspend is (£0.661m), which is partly offset by a projected overspend in relation to
the Health services element of £0.272m) over the same period.

Page 2

1.6 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to energy costs and essential commodities, including food and
vehicle fuel, and the ongoing negotiations around the 2022-23 local government pay
award. The impact of these in terms of the utilisation of Council reserves and knock
on effect on future budget gaps will continue to be monitored and reported to Cabinet
as appropriate. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2022/23. In addition to the budget approved
on 2 March 2022, earmarked funds of £31.875m were carried forward from 2021/22
for service expenditure in 2022/23 and are reflected in the figures within the 2022/23
financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net breakeven position, net of transfers
to/from reserves, is anticipated for the year to 31 March 2023. 
2.3 Details of the current financial projections are summarised in the following table: 
Appendix
No
Annual
Budget
Projection
to  31
March 2023
Projected
Variance
for year
(Fav)/Adv Note
Service Expenditure £000's £000's £000's
Chief Executives 1 19,576     19,571      (5)           
Communities 2 152,083   152,083     -              (i)
Place 3 67,537     69,346      1,809       (ii)
Other Corporate Services 4 34,915     32,664      (2,251)      (iii)
Sub Total 274,111   273,664     (447)       
Health and Social Care
Partnership 8 115,952   115,952     -              2.6
Balance for Services 390,063   389,616     (447)       
Financing Charges 5 12,396     12,396      -             
Contribution to Loans Fund
Reserve 5 3,301       3,301        -             
Total Planned Expenditure 405,760   405,313     (447)       
Planned Income
Aggregate External Finance 5 (340,331)  (340,331)    -             
Council Tax 5 (62,260)    (62,299)     (39)         
Use of Earmarked Funds 5 (3,169)      (3,169)       -             
Total Planned Income (405,760)  (405,799)    (39)         
Net Expenditure/ (Income) -              (486)          (486)       
Carried Forward Funds -              486           486        
Revised Net Expenditure/(Income) -              -               -

Page 3

2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that included in the approved budget, as detailed in the
following table: 
2.5 Commentary on Significant Movements from the Approved Budget 
The Council's overall financial forecast against the revised budget is a net breakeven
position. A brief explanation of the significant movements from the approved budget
are outlined as follows: 
(i) Communities – breakeven 
The breakeven position reported to 31 July 2022 reflects a range of overspends
and offsetting underspends across the services. These are primarily related to: 
• A net underspend in relation to Employee Costs, (£0.341m) primarily related to
vacancy management within the Connected Communities service;
• Lower than anticipated expenditure on external day placements, (£0.316m),
resulting from the assessment process within ASN; and
• Increased income, (£0.175m), related to PPP insurance and contractor penalty
charges. 
These have been partly offset by:
• Increased expenditure on Supplies and Services, £0.312m, related to inflationary
pressures within PPP Schools and Connected Communities;
• Increased expenditure on external residential placements, £0.275m;
• A net under-recovery of income across Connected Communities, £0.188m,
which has not yet returned to pre Covid levels; and
• An under-recovery of school lets income, again impacted by the pandemic,
£0.099m.
Non Domestic
Rates
Specific
Grants TOTAL AEF
Planned Income £000's £000's £000's
Approved Budget 2 March 2022 (260,648)       (37,575)         (20,057)         (318,280)      
Movements:
Music Tuition (195)             (195)            
Curriculum Charges (186)             (186)            
Adult Social Care (606)             (606)            
Easter Study Support (137)             (137)            
P4/P5 Universal Free School Meals (990)             (990)            
Holiday Free School Meals (712)             (712)            
HSCP Funding (5,607)           (5,607)          
DHP (2,550)           (2,550)          
Scottish Child Payment Bridging (1,541)           (1,541)          
Self Isolation Admin Grant (23)               (23)              
Cost of Living Awards (7,019)           (7,019)          
Summer Holiday Provision (324)             (324)            
Whole Family Wellbeing Fund (959)             (959)            
Pupil Equity Fund Brought Forward (1,202)           (1,202)          
-                  
Revised Planned Income (281,497)       (37,575)         (21,259)         (340,331)      
General Revenue
Grant
£000's

Page 4

Virements in relation to the recognition of additional grant income within
Information and Culture and Community Mental Health have been included within
Appendix 7. In addition, a virement has been proposed to remove the current
“books not returned” income budget within Connected Communities to support the
elimination of any potential barriers to service users accessing facilities during the
ongoing cost of living crisis. 
(ii) Place – overspend of £1.809m 
The net overspend is primarily related to :
• Increased utility cost charges reflecting higher than budgeted price inflation,
£1.264m, to be offset by the utilisation of earmarked reserves;
• Increased transport costs across Streetscene and Waste Services due to
legacy issues linked to the Covid pandemic, £1.057m;
• An under-recovery of income within Facilities Management arising from reduced
commercial catering, school meal and cleaning and janitorial income, £0.929m;
• Additional school transport contract costs, impacted by inflationary rises,
£0.432m;
• Lower than anticipated net income arising from delays in the implementation of
car parking charges and decriminalised parking enforcement, £0.221m; and
• Increased vehicle fuel costs reflecting higher than budgeted price inflation,
£0.163m, to be offset by the utilisation of earmarked reserves. 
These have been partly offset by:
• Lower than anticipated expenditure across Facilities Management linked to
reduced levels of commercial catering and school meal activity, (£0.910m);
• Reduced third party payments and increased income within Waste Services
linked to improved recyclates streams, (£0.900m);
• Lower than anticipated expenditure on the provision of catering and cleaning in
relation to the expansion of Early Learning and Childcare to 1140 hours,
(£0.486m); and
• Vacancy management within Other Housing, (£0.254m). 
The underspend in relation to the expansion of Early Learning and Childcare is
linked to specific grant funding. As such it is requested that £0.486m is earmarked
in relation to ELC expansion. 
Virements in relation to the recognition of additional income within Facilities
Management, Roads, Housing and Regeneration have been included within
Appendix 7. 
(iii) Other Corporate Items – underspend of (£2.251m) 
The projected underspend is primarily related to the drawdown of (£1.644m) from
earmarked funds in relation to additional contractual and non contractual energy
and fuel costs reported across the services, linked to significant unbudgeted
inflationary pressures. In addition, centrally held funds of (£0.578m) are not
expected to be fully utilised in year. 
These funds have been applied to offset the net overspend reported within Place.

Page 5

A virement to realign the Housing Benefit income and expenditure budgets to
current activity levels has been detailed in Appendix 7 
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of July 2022 is
attached at Appendix 8. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised below: 
• The projected outturn is a year-end underspend of (£0.389m) for 2022/23. 
• The projected underspend on the Council Services element is (£0.661m) over the
same period. This is partly offset by a projected overspend on the Health Services
element of £0.272m; 
• The main areas of risk identified include: 
 Learning disability care packages;
 Residential placements for children;
 Implementation of Scottish Government policies;
 Covid recovery and re-mobilisation of services;
 Implementation of the National Care Service;
 Local Government and NHS pay awards for 2022/23; and
 Inflationary pressures. 
The projected outturn position of the HSCP assumes a 3% pay award at this time.
With pay negotiations currently ongoing, this position will require to be reviewed
following any pay settlement during 2022-23. 
The projected position highlights the progress towards financial balance essential to
minimise further financial risk to the Council within the context of the current debt of
£2.320m. Based on current projections the debt is due to be cleared during 2023/24.
In view of the likely significant budget gap in 2023/24, options to accelerate the
repayment of debt in 2022/23 are currently being considered. Further information will
be presented to Cabinet during the course of the year. 
Risks 
2.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to energy costs and essential commodities, including food and
vehicle fuel, and the ongoing negotiations around the 2022-23 local government pay
award.

Page 6

As noted at 2.5, £1.644m has been drawn down from earmarked reserves to offset
the additional inflationary pressures identified across services to 31 July 2022. In June
2022, Cabinet agreed to earmark £1.888m from the 2021/22 underspend to address
unbudgeted inflationary pressures arising from the current cost of living crisis. Any
further increases beyond current budget provision may impact on future service
provision. 
The ongoing negotiations in relation to the 2022/23 local government pay award have
resulted in an increased offer equivalent to an average of 6.34% across the workforce
(including the HSCP), compared to budgeted provision of 3%. The Scottish
Government has announced additional funding to support the increased offer.
However, it is currently forecast this this would result in additional costs of £1.6m
(including the HSCP) in 2022/23, which will require to be funded and which will
increase the forecast budget gap in 2023/24 and beyond. The outcome of the current
negotiations will be monitored, with the final impact on budgets reported to Cabinet
when confirmed. 
Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2022/23 and an
in-year underspend of (£1.219m), (2.2%), is currently anticipated for the year to 31
March 2023. This is summarised in the following table with further details provided in
Appendix 6. 
Annual
Budget
Projection to 
31 March
2023
Projected
Variance for
year
(Fav)/Adv Note
£000's £000's £000's
Employee Costs 5,300        5,502          202              (i)
Property Costs 18,851      18,919        68               (ii)
Supplies and Services 451          440             (11)             
Transport and Plant Costs 34            34              -                 
Administration Costs 1,881        1,870          (11)             
Third Party Payments 2,550        2,679          129              (iii)
Transfer Payments 155          155             -                 
Other Expenditure 368          368             -                 
Capital Financing 24,692      22,862        (1,830)          (iv)
Gross Expenditure 54,282      52,829        (1,453)         
Income (54,282)     (54,048)       234              (v)
Net Expenditure -               (1,219)         (1,219)

Page 7

2.9 Commentary Significant Movements from the Approved Budget 
A brief explanation of the significant movements from the approved budget forecasts
is outlined as follows: 
(i) Employee Costs – overspend of £0.202m
The overspend reflects a projected pay award in excess of the budgeted
provision. 
(ii) Property Costs – overspend of £0.068m 
The movement is primarily related to increased expenditure on Responsive
Repairs, £0.463m, partially related to construction inflation. This has been partly
offset by reduced expenditure on Void Repairs, (£0.109m), Planned and Cyclical
Maintenance, (£0.118m) and Other Property Costs, (£0.167m). 
(iii) Third Party Payments – overspend of £0.129m 
The overspend reflects higher than anticipated recharges from Housing Asset and
Investment. 
(iv) Capital Financing – underspend of (£1.830m) 
The underspend is primarily related to reduced loan charges, reflecting the
reduced level of HRA Capital expenditure. 
(v) Income – under-recovery of £0.234m 
The under-recovery is primarily related to lower than anticipated income from
Council House Rents, £0.342m, and other recharges, £0.131m, partly offset by an
over-recovery of Other Rents (£0.209m). 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(c) note the information and financial projections outlined in the report; 
(d) approve the earmarking of £0.486m identified at 2.5 to meet future year
commitments;
(c)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; 
(d)  approve the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 31 July 2022 is a net breakeven position. 
Housing Revenue Account
The net projection for the year as at 31 July 2022 is a net underspend of (£1.219m).

Page 8

Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
General Services Revenue Estimates 2022/23 to 2024/25 - Council 2 March 2022
Housing Revenue Account (HRA) Capital Investment Programme, Revenue Budget and
Rent Levels for 2022/23 – Council 16 February 2022

Page 9

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 193              198              5                     3%
Total for Chief Executive 193              198              5                     3%
Financial Services
Change Programme 1                  1                  -                      0%
Audit, Fraud, Safety & Insurance 645              651              6                     1%
Corporate Procurement 967              889              (78)                  (8%) 1         
Financial Services 1,300           1,300           -                      0%
Revenues (538)             (538)             -                      0%
Transformation 696              708              12                   2%
Total for Financial & Customer Services 3,071           3,011           (60)                  (2%)
People & ICT
Employee Services 898              898              -                      0%
HR & Organisational Development 1,096           1,096           -                      0%
ICT 5,279           5,326           47                   1%
Business Support 1,259           1,259           -                      0%
Customer Services 3,767           3,767           -                      0%
Total for People & ICT 12,299         12,346         47                   0%
Democratic Services
Legal & Licensing 463              487              24                   5%
Policy, Performance & Elections 473              459              (14)                  (3%)
Communications 464              464              -                      0%
Civil Contingencies 60                60                -                      0%
Committee Services 554              554              -                      0%
Member Services 1,329           1,334           5                     0%
Ayrshire Support Service 54                54                -                      0%
Information Governance 404              392              (12)                  (3%)
Total for Democratic Services 3,801           3,804           3                     0%
Growth & Investment
Growth & Investment 212              212              -                      0%
Total for Growth & Investment 212              212              -                      -             
Net Total 19,576         19,571         (5)                    (0%)

Page 10

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 16,386         16,303         (83)                  (1%)
Property Costs 68                68                -                      0%
Supplies and Services 3,042           3,068           26                   1%
Transport and Plant Costs 27                27                -                      0%
Administration Costs 1,371           1,375           4                     0%
Other Agencies & Bodies 2,026           2,026           -                      0%
Transfer Payments 817              817              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 23,737         23,684         (53)                  (0%)
Income (4,161)          (4,113)          48                   (1%)
Net Expenditure 19,576         19,571         (5)                    (0%)

Page 11

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
957 (108) -11% Employee Costs - An underspend of £0.108m due to vacancy management.
- 30 Other minor variances
(78)

Page 12

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 20,059         20,027            (32)                  -0.2%
Primary Education 43,970         43,945            (25)                  -0.1% 1         
Secondary Education 55,800         55,822            22                   0.0% 2         
Additional Support Needs 11,783         11,738            (45)                  -0.4% 3         
Education - Other 3,141           3,221              80                   2.5% 4         
Pupil Equity Fund 5,414           5,414              -                      0.0%
Connected Communities 11,917         11,917            -                      0.0% 5         
Net Total 152,084       152,084          -                      0.0%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 125,239       124,896          (343)                0%
Property Costs 535              524                 (11)                  (2%)
Supplies and Services 15,725         16,055            330                 2%
Transport and Plant Costs 141              137                 (4)                    (3%)
Administration Costs 650              648                 (2)                    (0%)
Other Agencies & Bodies 13,153         13,084            (69)                  -1%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 78                78                   -                      0%
Gross Expenditure 156,101       156,002          (99)                  0%
Income (4,017)          (3,918)             99                   -2%
Net Expenditure 152,084       152,084          -                      0%

Page 13

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Primary Education
41,811 (63) 0%
Employee Costs : £0.380m underspend in non teaching staff costs across all primaries offset against a £0.316m
overspend in teacher staff costs. The teaching projections are based on 21/22 academic year staffing levels and the
projections are pending confirmation of teaching staffing levels for the new academic year.
1,970 22 1% Supplies and Services :  £0.022m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
143 (28) -20% Third Party Payments: an underspend of £0.028m as less overtime required due to streamlined processes
(71) 44 -62% Income: under recovery of school let income due to school lets not fully operational
(25)
Note 2 Secondary Education
42,410 (171) 0% Employee Costs : £0.171m underspend in non teaching staff costs.
13,146 178 1% Supplies and Services : £0.178m overspend in PPP costs due to pass through utility costs subject to same inflationary
pressures as other schools.
202 (30) -15% Third Party Payments: an underspend of £0.030m as less overtime required due to streamlined processes
(73) 45 -62% Income: under recovery of school let income due to school lets not fully operational
22
Note 3 ASN
9,966 (14) 0%
Employee costs: £0.161m overspend in teaching costs offset by £0.177m underspend in non teaching staff costs across
all ASN school and bases provision.  The teaching projections are based on 21/22 academic year staffing levels and the
projections are pending confirmation of teaching staffing levels for the new academic year.
This projection takes no account of the outcome of the ongoing Supporting Needs review.
1,010 (316) -31%
There is a projected underspend of £0.316m on external day placements as a result of the assessment process currently
in place. This enables the children to remain in mainstream establishments or in-authority ASN establishments.
499 275 55%
There is a projected overspend of £0.275m on external specialist residential placements due to the wider impact of the
pandemic on the ongoing number of children in residential education.  Currently there are 7 children in accommodation. 
Joint working is ongoing with HSCP to continually assess the care setting for these children in delivering positive
outcomes.
10 Other minor movements across various budget lines
(45)
Note 4 Education Other
4,678 216 5%
Employee costs: £0.059m underspends across central HQ staff, projected overspends in Teacher HQ cover of £0.404m
and £0.314m teacher turnover.
This is offset by a projected underspend of £0.443m of the new £3.5m Scottish Government grant for Teaching and non
Teaching staff due to part year costs (August start).
1,415 21 1% Third Party Payments - small overspends across various subscriptions/licences
(1,637) (175) 11% Income - PPP insurance rebate £0.075m and deductions of £0.100m in excess of budget.
18 Other minor movements across various budget lines
80
Note 5 Connected Communities
7,242 (277) -4% Employee Costs: underspends across all sectors due to vacancy management
734 112 15% Supplies and Services: anticipated inflationary increase in costs
3,713 - 0%
Third Party Payments: Additional support to NALL from the Council will be from the use of previously earmarked funds
totalling £0.365m which will be used to support the trading deficit position and the renewal programme within NALL.
(1,452) 188 -13% Income: projected £218K under recovery across various sectors as income has not returned to pre covid levels offset by
projected over recovery in Arran Outdoor of £30K
(23) Other minor movements across various budget lines
Libraries - virement request of £6K to remove books not returned income target utilising overall Book budget due to
ongoing cost of living issues
-

Page 14

Appendix 3
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 187              187               -                     0%
Housing and Public Protection
Building Services (2,542)          (2,542)           -                     0% 1         
Property Governance (7)                 (7)                  -                     0%
Protective Services 1,315           1,315            -                     0%
Facilities Management 15,417         14,903          (514)               (3%) 2         
Other Housing 2,982           2,727            (255)               (9%) 3         
Total for Housing and Public Protection 17,165         16,396          (769)               (4%)
Commercial Services
Roads 6,721           7,067            346                 5% 4         
Streetscene 4,788           5,017            229                 5% 5         
Waste Resources 9,408           9,514            106                 1% 6         
Total for Commercial Services 20,917         21,598          681                 3%
Economic Growth and Regeneration
Planning Services 290              290               -                     0%
Economic Development 4,277           4,277            -                     0%
Total for Economic Growth and Regeneration 4,567           4,567            -                     0%
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,449           1,421            (28)                 (2%) 7         
Housing Assets & Investment (2)                 (2)                  -                     0%
Property Maintenance 3,372           3,372            -                     0%
Property Running Costs 4,909           4,909            -                     0%
Energy and Sustainability 5,136           6,411            1,275              25% 8         
Internal Transport 9,837           10,487          650                 7% 9         
Total for Sustainability, Transport and Corporate
Property 24,701         26,598          1,897              8%
Net Total 67,537         69,346          1,809              3%
Transfer to Earmarked Reserves 486               486                
Net Total 67,537         69,832          2,295

Page 15

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 56,437         56,581          144                 0%
Property Costs 22,409         23,811          1,402              6%
Supplies and Services 14,844         13,811          (1,033)            (7%)
Transport and Plant Costs 7,244           8,124            880                 12%
Administration Costs 996              1,005            9                     1%
Other Agencies & Bodies 17,191         16,539          (652)               (4%)
Transfer Payments -                   -                    -                     0%
Other Expenditure 182              161               (21)                 (12%)
Gross Expenditure 119,303       120,032        729                 1%
Income (51,766)        (50,686)         1,080              (2%)
Net Expenditure 67,537         69,346          1,809              3%

Page 16

Appendix 3a
PLACE
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
5,624 (1,576) (28%)
Supplies & Services: An underspend of £1.576m in supplies and services. This is due to an underspend in materials as
a result of a change in the composition of the works programme. This underspend is offset against the reduction in
income shown below.
2,152 388 18% Third Party Payments: An overspend in third party payments of £0.388m. This is due to an overspend of £0.416m in
payment to contractors partially offset by an underspend of £0.028m in Agency costs.
(20,153) 1,149 (6%) Income: There is an under recovery of income of £1.149m. This is primarily due to the delay in the door renewal,
detection equipment and kitchen programmes.
39 Other minor movements
-
Note 2 Facilities Management
12,654 (433) (3%)
Employee Costs: Underspend of £0.120m is due to reduced commercial catering activity. There is an underspend of
£0.162m due to the reduced uptake of school meals. Both these underspends relate to the under recovery of income
highlighted below.  In addition, there is an underspend of £0.151m due to recruitment issues and reduced overtime and
casual costs.
962 104 11% Property Costs:  Overspend is primarily in relation to purchasing cleaning materials in response to Covid-19.
4,985 (1,143) (23%)
Supplies and services: There is a saving of £0.165m in food due to reduced commercial catering.  There are further
food savings of £0.463m due to reduced school meal uptake.  In addition, there is an underspend within Early Years of
£0.486m which has arisen due to a lower attendance rate than originally anticipated.  There is also a saving of £0.029m
within tools and implements. 
(3,442) 929 (27%)
Income: There is an under-recovery in commercial catering income of £0.725m due to the closure of buildings from
Covid-19 restrictions.  There is also an under-recovery of school meal income of £0.138m and cleaning and janitorial
income of £0.066m.
A marketing campaign is being rolled out to encourage the uptake of school meals across the school estate.
29 Other minor movements
The £0.486m underspend noted in relation to the early years expansion is linked to specific grant funding provided by
the Scottish Government, as such it is proposed that this underspend is earmarked.
(329)
Note 3 Other Housing
4,460 (254) (6%) Employee Costs: Underspend due to vacancy management.
(1) Other minor movements.
A proposed budget virement has been included in Appendix 7 to realign budgets to outturn expected at the start of the
year.
(255)
Note 4 Roads
1,942 (65) (3%)
Third Party Payments: Due to Covid-19 related delays in implementing the Car Parking Charges and Decriminalised
Parking Enforcement saving, the £0.125m budget allocated as part of the saving will not be used. The roads
maintenance budget has been adversely affected by inflationery pressures and the service is managing the programme
taking account of this. However there remains a small overspend in unavoidable contractor costs.
(2,399) 370 (15%)
Income: £0.346m of the variance relates to the saving for Car Parking Charges and Decriminalised Parking
Enforcement, which will not be achieved this year due to delays in the transfer of these powers. The remaining variance
mainly relates to an under recovery in salaries recovered from capital, partly offset with an over recovery in fees and
charges.
41 Other minor movements.
A proposed budget virement for £0.784m has been included in Appendix 7. This is to increase the income and related
expenditure budgets for work carried out for other Council Services.
346

Page 17

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Streetscene
6,678 57 1% Employee costs: There is an overspend of £0.057m due to additional overtime costs for Cemeteries for essential safety
work on headstones and additional bank holiday working.
129 145 112%
Transport Costs: Extra vehicles are on hire due to Seasonal work ( two of which go off hire soon), HAVS operator and a
loan of vehicles to Waste to deal with bin deliveries due to legacy issues from Covid.  There is also an overspend in
skip hire of £0.045m, which is historical, and levels of waste have stayed at comparable levels from 2021/22 to 2022/23
due the continuation of staycations.  
327 61 19% Supplies and Services: Overspend is due to essential material inflationary pressures.
(34) Other minor movements
229
Note 6 Waste Services
4,762 806 17%
Employee Costs:  Additional temporary labour remains in place within Waste Operations as the service recovers from
the pandemic. Work to review beats taking account of post pandemic waste composition analysis and to balance the
burden of new builds is ongoing with Trade Union colleagues resulting in support arrangements being required. In
addition there is a high volume of annual leave not taken due to COVID, requiring holiday cover.
6,441 (699) (11%)
Third Party Payments:  Underspend in Payment to contractors of £0.749m largely a result of improved quality of our
recyclate streams following sustained ‘right stuff, right bin’ campaigns alongside more competitive recyclate prices
within our disposal contracts.  This is offset by an overspend in Clyde Valley waste of £0.065m which will be be funded
from reserves.
160 131 82% Transport Costs: Overspend of £0.151m due to the new way of working requiring 2 additional hire vehicles plus a long
term hire. This is being reviewed in line with the post pandemic review of beats.
(2,780) (130) 5%
Income: Over-recovery of income  due to the recyclates market for glass, cans, plastics and paper being favourable to
provide income rather than a cost to the council £0.151m.  This is offset by an under recovery of gas extraction income
£0.061m.
(2) Other minor movements.
106
Note 7 Property Management and Investment
2,350 (65) (3%) Employee Costs: An underspend of £0.065m due to vacancy management.
37 Other minor movements
(28)
Note 8 Energy and Sustainability
4,725 1,264 27%
Property Costs: Due to the current energy crisis there is an overspend in property costs of £1.819m due to increased
utility cost charges.  Electricity is forecast to be £0.441m overspent, gas £1.224m over and biomass £0.214m over. 
These costs are offset partially by an underspend in water charges of £0.096m and a drawdown of expected price
inflation funds of £0.554m. The remaining overspend is the inflationary pressure on the energy budgets that is greater
than the budgeted levels                                                                                                                                                                                       
A review is underway to confirm options available to reduce consumption across our estate further to help mitigate the
inflationary pressure. This will be considered in the context of a need for sufficient ventilation in buildings and will also
be contingent on temperatures experienced during the winter season                                                                                                                                                                
11 Other minor movements
1,275
Note 9 Internal Transport
4,201 432 10% Transport Provision Costs: A projected overspend of £0.432m is largely due to direct fuel cost increases and indirect
fuel and labour cost increases through our school transport contracts.
1,643 163 10% Fuel Costs: This projected overspend of £0.163m is due to the increase in fuel prices and the legislative changes
restricting the use of rebated gas oil (or 'red diesel as it is commonly referred to).
467 55 12% External Hires: Projected overspend of £0.054m due to additional hire vehicles as a result of increased lead time for
replacement vehicles.
650

Page 18

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,212 2,212 -                   0%
SPT Concessionary Fares 286 286 -                   0%
Ayrshire Joint Valuation Board 954 932 (22)               (2%)
3,452 3,430 (22)               (1%)
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 310 310 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
26,836 24,614 (2,222)          (8%) 1           
Housing Benefits 2,422           2,415           (7)                 0%
34,915 32,664 (2,251)          (6%)

Page 19

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Other Corporate Items
26,836 (2,222)            -8%
The projected underspend is primarily related to the drawdown of £1.644m earmarked funds in relation to additional
contractual and non contractual energy and fuel costs reported across the services, linked to significant unbudgeted
inflationary pressures. In addition, centrally held funds of £0.578m are not expected to be fully utilised in year,
including lower than anticipated costs in relation to the Council Tax Reduction regulatory changes and additional
Scottish Government funding in relation to Core Curriculum Charges and changes to DHP distributions.
These funds have been applied to offset the overspend reported within Place at Appendix 3.
(2,222)

Page 20

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 12,396 12,396 - -
Contribution to Loans Fund Reserve 3,301 3,301 - -
Scottish Government Funding (340,331) (340,331) - -
Council Tax (62,260) (62,299) (39) 0% 1
Use of Earmarked Funds (3,104) (3,104) - -
Net Total (389,998) (390,037) (39) 0%
Although the income from Council Tax is projected to be in line with the revised budget. In year collection rates remain
below that of pre-pandemic years resulting in an increase in Bad Debt Provision to 4% compared to the previous 3.5%
Note 1 Council Tax

Page 21

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,300 5,502 202 4% 1
Property Costs
Responsive Repairs 5,678 6,141 463 8%
Void Repairs 3,147 3,038 (109) (3%)
Planned and Cyclical Maintenance 4,862 4,744 (118) (2%)
Aids and Adaptions 1,617 1,617 - 0%
Other property costs 3,547 3,379 (168) (5%)
Total for Property Costs 18,851 18,919 68 2
Supplies & Services 451 440 (11) (2%)
Transport Costs 34 34 - 0%
Administration Costs 1,881 1,870 (11) (1%)
Third Party Payments 2,550 2,679 129 5% 3
Transfer Payments 155 155 - 0%
Other Expenditure 368 368 - 0%
Capital Financing Costs 24,692 22,862 (1,830) (7%) 4
Gross Expenditure 54,282 52,829 (1,453) (3%)
Income
Council House Rents (53,310) (52,967) 343 (1%)
Other Rents (326) (536) (210) 64%
Recharges (500) (368) 132 (26%)
Other Income (146) (177) (31) 21%
Transfer from HRA Reserves - - - 0%
Total Income (54,282) (54,048) 234 (0%) 5
Net Expenditure - (1,219) (1,219)

Page 22

Appendix 6a
HRA
BUDGETARY CONTROL 2022/23
REPORT FOR THE 4 MONTHS TO 31 JULY 2022
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
5,300 202 4%
202
Note 2
18,850 68 0%
68
Note 3
2,550 129 5%
129
Note 4
24,692 (1,830) -7%
(1,830)
Note 5
(54,282) 234 0%
234
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/23
£m £m £m £m £m £m
5.280 - - - (1.151) 4.129
1.500 - - - - 1.500
5.000 - - - - 5.000
1.558 - - - - 1.558
0.123 - - - - 0.123
0.781 - - 1.219 - 2.000
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.270 - - - - 0.270
15.616 - - 1.219 (1.151) 15.684
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works
Section
Employee costs
An overspend in employee costs of £0.202m. This is primarily due to an increased projection in the salary uplift.
Income
An under recovery in income of £0.234m. This is due to an under recovery of £0.342m in Council House Rents and
£0.131m in recharges offset by an over recovery in income of £0.209m in Other Rents and £0.030m in other
income.
Property Costs
An overspend in property costs of £0.068m. This is due to an overspend of £0.463m in Responsive Repairs,
partially related to construction inflation, offset by underspends of £0.109m in Voids Repairs, £0.118m in Planned
and Cyclical Maintenance, and £0.167m in other property costs.
HRA reserves and balances
Third Party Payments
An overspend in third party payments of £0.129m. This is due to an overspend of £0.188m in relation to the
Housing Asset and Investment recharges partially offset by an underspend of £0.059m in ASB and Tenant Support
charge.
Capital Financing Costs
There is an underspend in capital financing costs of £1.830m due to reduced loan charges. This is due to the
reduced levels of expenditure currently being experienced in the HRA Capital budget

Page 23

Appendix 7
1) Budget Virements
Place
Facilities Management - Employee Costs T -0.086
Facilities Management - Supplies and Services T -0.131
Facilites Management - Income T 0.217
Roads Network - Third Party Payments T 0.498
Roads Network - Supplies and Services T 0.286
Roads Network - Income T -0.784
Housing - Property Costs P 0.222
Housing - Other Expenditure P -0.096
Housing - Income P -0.126
Regeneration - Third Party Payments T 0.260
Regeneration - Employee Costs T 0.210
T -0.470
0.000
Information and Culture - Grant Income T -0.188
Information and Culture - Supplies and Services T 0.124
Information and Culture - Employee Costs T 0.064
Information and Culture - remove Books not returned income target P 0.006
P -0.006
Community Mental Health - Grant Income T -0.267
Community Mental Health - Supplies and Services T 0.002
Community Mental Health - Employee Costs T 0.158
Community Mental Health - Third Party Payments T 0.106
Community Mental Health - Administration Costs T 0.001
0.000
OCI
Cost of Housing Benefits - Rent Rebates T -3.500
Cost of Housing Benefits - Rent Allowances T -8.600
Cost of Housing Benefits - Income from DWP T 12.100
0.000
Information and Culture - reduce book budget to offset above income target
Regeneration - Grant Income
Communities
Budget Management - 31 July 2022
Virement/Budget Adjustment Requests
2022/23
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m

Page 24

Official-Protect
Official-Protect 
Integration Joint Board
22nd September 2022
Subject:  2022-23 – Month 4 Financial Performance
Purpose:  To provide an overview of the IJB’s financial performance as at
Month 4 (July) including an update on the estimated financial
impact of the Covid-19 response.  
Recommendation:  It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for the
financial year 2022-23 and the current overall projected year-end
underspend of £0.389m;
(b) notes the progress with delivery of agreed savings;
(c) notes the remaining financial risks for 2022-23, including the
impact of remaining Covid-19 estimates and costs; and
(d) approves the budget reductions which are detailed at paragraph
2.11. 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected expenditure
and income commitments; these have been prepared in conjunction with relevant
budget holders and services.   It should be noted that, although this report refers to
the position at the end of July, further work is undertaken following the month end to
finalise projections, therefore the projected outturn position is as current and up to
date as can practicably be reported. 
1.2 The projected outturn is a year-end underspend of £0.389m (0.1%) for 2022-23.

Page 25

Official-Protect
Official-Protect
1.3 From the core projections, overall, the main areas of pressure are learning disability
care packages, residential placements for children, supplementary staff in wards and
Unplanned Activities (UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
The report also includes detail of the estimated costs and potential financial impact of
the Covid-19 response. 
FINANCIAL PERFORMANCE – AT MONTH 4 
2.2 At Month 4 against the full-year budget of £280.909m there is a projected year-end
underspend of £0.389m (0%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected underspend of £0.661m in social care services and a projected
overspend of £0.272m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £81.169m there is a projected underspend of £0.757m
(0.9%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£1.070m. 
The budgeted number of permanent placements is 778 and at month 4 there are
755 placements.  The projection assumes that there will be a gradual increase in
placements to reach the budgeted figure by the end of the financial year. Within
the projection there is an assumption that recent placements which do not have a
completed financial assessment (often due to the pressure to discharge from
hospital) are costed with 50% of the cases at the current average cost of a
placement and 50% at the gross or interim funded rate.  It is likely that there will
still be some cases being gross or interim funded at the year end. Their actual
cost will not be known until the FA1 financial assessment is completed. 
The level of income recovered from charging orders was under recovered in
2021-22 but an online position is assumed at month 4.

Page 26

Official-Protect
Official-Protect
b) Care at home (in house) is projected to be £0.637m underspent. As there are
vacant posts some of the current capacity is being met by existing staff working
additional hours and casual staff.  Bank staff are being offered contracts and
additional staff are being recruited which will replace the need for existing staff to
work additional hours.  The majority of the underspend is in purchased care at
home as providers are not always able to accept referrals due to staffing /
recruitment issues. 
c) Community alarms are projected to be £0.205m underspent due to vacancies
which are being actively recruited to. 
d) Reablement services are projected to be £0.153m underspent due to vacancies
which are being actively recruited to. 
e) Care at Home Charging Income is projected to under recover by £0.087m due to
an ongoing shift towards personal care which is non chargeable. This is after
applying £0.076m of covid funding. 
f) Physical Disability Care Packages (including residential and direct payments) -
projected overspend of £0.144m in community care packages, £0.099m in direct
payments and £0.313m for residential placements. 
g) Adaptations are projected to be online based on spend to date. 
h) Anam Cara is projected to overspend by £0.127m due to an overspend on
employee costs relating to covering vacancies and sickness.   
i) Integrated Island Services is projected to be £0.164m overspent mainly due to
additional accommodation costs for mainland staff working at Montrose House
following the recent increase in the number of residents. 
j) District Nursing is projected to overspend by £0.029m due to an overspend on
supplies. 
k) Rehab wards are projected to overspend by £0.188m (Redburn ward £0.286m
overspent and Douglas Grant £0.098m underspent).  The overspend at Redburn
is due to cover costs for vacancies as well as supplementary staffing for patients
who require one to one support. 
2.4 Mental Health Services     
Against the full-year budget of £87.744m there is a projected overspend of £0.726m
(0.8%). This excludes any potential variance on the Mental Health Recovery and
Renewal Funding where any underspend will be earmarked at the year-end for use in
2023-24. The main variances are: 
a) Learning Disabilities are projected to overspend by £1.117m and the main
variances are: 
• Care Packages (including residential and direct payments) - projected
overspend of £0.494m in community care packages, £0.200m in direct
payments and £0.468m for residential placements.

Page 27

Official-Protect
Official-Protect
Community Learning Disability Care packages are proving to be one of the
most challenging areas to address overspends.  The data from CM2000 will
be reported back to the service to allow them to see where care has
deviated from the planned level and focus reviews to those areas.   
• In house day care is projected to underspend by £0.144m as a result of
reduced service provision due to Covid restrictions and vacancies following
the service redesign and staffing model changes. 
• Residential Respite is projected to overspend by £0.091m which reflects
funding the new facility (Roslyn House) to full capacity.   
b) Community Mental Health services are projected to underspend by £0.451m and
included within this are underspends of £0.650m in community packages (including
direct payments) and an overspend of £0.188m for residential placements.   
c) The Lead Partnership for Mental Health is projecting to be £0.090m overspent and
the main variances are as follows: 
• A projected underspent in Adult Inpatients of £0.226m.  This is mainly due to
overspends in the of supplementary staff, staff in redeployment and reduced
bed sale income which are offset by £0.306m of income in relation to the
firestop works. 
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.200m based on current number of placements remaining until the year end.
These placements are for individuals with very specific needs that require a
higher level of security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women, people
with a learning disability or people with neurodevelopmental disorder. This can
necessitate an UNPACs placement with a specialist provider which can be out-
of-area.  The nature of mental health UNPACS spend is that it is almost
exclusively on medium or long term complex secure residential placements
which are very expensive so a small increase in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions between
units or levels of security can take many months. Applications to approve a
placement are made to the Associate Medical Director for Mental Health who
needs to be satisfied that the placement is appropriate and unavoidable prior
to this being agreed. 
• A projected overspend in MH Pharmacy of £0.100m due to an increase in
substitute prescribing costs. 
• Learning Disability Services are projected to overspend by £0.206m. This is
mainly due to high usage of supplementary staffing, cross-charging for a LD
patient whose discharge has been delayed and redeployment staffing costs.
Supplementary staffing costs relate to backfill for sickness, increase and
sustained enhanced observations and vacancies.  The enhanced observations
are reviewed on a daily basis however, due to the individuals being acutely
unwell at present, this level of enhanced observations has been maintained for
a lengthy period of time.   The projection assumes that we begin cross charging
another HSCP for the ongoing costs of the person detailed above where,
despite having extensive time to identify an alternative placement there has, as
yet been no solution identified.

Page 28

Official-Protect
Official-Protect
• Elderly Inpatients are projected to overspend by £0.144m mainly due to the use
of supplementary staffing.  
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.120m in 2022-23, further
information is included in the table below: 
The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• Adult Community Health services £0.192m
• CAMHS £0.546m
• Mental Health Admin £0.240m
• Psychiatry £0.100m
• Psychology £0.503m
• Associate Nurse Director £0.020m 
Vacancy Savings Target (£0.481m)
Projected to March 2023 £1.601m
Over/(Under) Achievement £1.120m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £36.491m there is a projected overspend of £1.903m
(5.2%). The main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£1.914m. The main areas within this are noted below: 
• Children’s residential placements are projected to overspend by £2.450m prior
to Covid funding and projected to overspend by £1.704m after £0.746m of
Covid funding.  We started 22/23 with 23 placements and of these placements
one is assumed to be discharged in August, one in September, one in October 
and two in December taking the placement numbers to 18 by the end of the
year. 
• Fostering placements are projected to underspend by £0.153m based on the
budget for 115 places and 115 actual placements (of which 6 are Covid related
and are funded through the Covid-19 funding) since the start of the year.
Recruitment of foster carers is an active priority for the team, both to limit the
requirement for external foster placements and reduce pressures elsewhere
on the service. This is promoted through regular targeted recruitment
campaigns, community awareness raising and daily presence on various social
media platforms. Our active recruitment strategy is gaining some interest and
we are actively pursuing a number of enquiries as a result.
• Fostering Xtra placements are projected to be on-line after applying £0.086m
of covid funding. The projection is based on the budget for 30 placements and
29 actual placements since the start of the year.

Page 29

Official-Protect
Official-Protect
• Private Fostering placements are projected to be £0.056m underspent based
on the budget for 17 placements and 14 actual placements since the start of
the year.
• Kinship placements are projected to underspend by £0.162m based on the
budget for 376 places and 360 actual placements since the start of the year.  
• Adoption placements are projected to overspend by £0.098m based on the
budget for 53 places and 67 actual placements since the start of the year. 
b) Children with disabilities – residential placements are projected to underspend
by £0.094m based on 8 placements which are expected to continue until the
end of the year. 
c) Residential respite – placements are projected to overspend by £0.394m. 
These short-term placements are used to prevent an admission to full
residential care.  There are currently 4 placements which three expected to be
discharged in August and two in September. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
AHP services are projected to underspend by £0.124m due to underspends in non-
employee costs. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.700m due to a projected underspend in the
Carers Strategy funding. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.219m. The
main areas of underspend are:
• An over-recovery of payroll turnover of £0.972m for social care services as
outlined in para 2.9 below.
• An over-recovery of payroll turnover of £0.262m for health services as outlined
in para 2.9 below.
• The 2022-23 budget included a budgeted surplus on the social care side offset
by a budgeted deficit on the health side of the budget.   The net impact is neutral
but Appendix A will show this position for each element. 
2.9  Turnover/Vacancy Savings 
The turnover targets and projected achievement for the financial year for Health and
Social Care services out with the Lead Partnership is noted below: 
Social Care Health
Services
Vacancy Savings Target (2.014m) (1.183m)
Projected to March 2023 2.986m 1.445m
Over/(Under) Achievement 0.972m 0.262m

Page 30

Official-Protect
Official-Protect
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £1.493m (74% of annual target) has been
achieved to date.  The turnover achieved to date is higher than usual as the 22/23
budget included investment in various areas of staffing and these posts are not fully
recruited to yet.  The underspend in day care for older people has also been included
as payroll turnover in 2022/23 which is a change from 2021/22 when the underspend
was held to offset additional care at home costs.   
The health vacancy projection to the year-end is based on the month 4 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas. 
The main areas are month 4 are: 
• Management and Support   £0.241m
• Community Care Service Delivery  £0.215m
• Locality Services £0.160m
• Rehab and Reablement  £0.160m
• Community Mental Health £0.140m
• Learning Disability Services £0.140m
• Integrated Island Services £0.136m 
There have been no intentional plans to pause or delay recruitment and services have
actively continued to recruit; in some service areas it has proven difficult to fill posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.10 Savings Progress 
a) The approved 2022-23 budget included £0.683m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 4
£m
Red - -
Amber 0.060 0.060
Green 0.623 -
Blue - 0.623
TOTAL 0.683 0.683 
b) The main area to note is that amber savings of £0.060m relating to adoption
allowances are assumed to be achieved in the projected outturn but final plans
to deliver this have still to be agreed.   
Appendix B shows the full Transformation Plan for 2022/23 which has been agreed
by the Transformation Board; the Board is in place to provide oversight and
governance to the programme of service change.   A focus of the Board is to ensure

Page 31

Official-Protect
Official-Protect
plans are in place to deliver savings and service change, with a solution focussed
approach to bringing programmes back on track. 
Not all the service changes on the Transformation Plan have savings attached to them
but there is an expectation that they will lead to service improvements. The Plan is
critical to the ongoing sustainability and safety of service delivery and to supporting
the delivery of financial balance in future. 
Appendix C provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving.   
2.11 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis…. without
the express consent of the Integration Joint Board.” 
Appendix D highlights the movement in the overall budget position for the Partnership
following the initial approved budget. 
Reductions Requiring Approval:
1) Software license transfer to IT  £0.003m
2) Prescribing £0.071m
3) Admin Post to Medical Records £0.034m 
2.12 NHS – Further Developments/Pan Ayrshire Services 
Lead Partnerships: 
The IJB outturn position is adjusted to reflect the impact of Lead Partnership services.
The outturn for all Lead Partnership services is shared across the 3 Partnerships on
an NRAC basis; this position is currently the default pending further work to develop
a framework to report the financial position and risk sharing across the 3 Partnerships
in relation to hosted or lead service arrangements, which has been delayed by the
requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
require to be shared with North. At Month 4 the MH lead partnership is projected to
overspend by £0.090m (£0.029m NRAC share for East and £0.028m for South). 
East HSCP – are projecting a £0.604m underspend of which £0.223m (37%) is
attributable to North.  The main variances are: 
Primary Care - there are reduced costs within Dental Services, where there
is a projected underspend of £0.277m. This is largely due to Childsmile and
the Dental Management Team both running with a number of vacancies. In
addition, there are reduced costs within Primary Care Contracting and
Support £0.297m, largely due to vacant posts, as well as projected savings in

Page 32

Official-Protect
Official-Protect
Diabetic Retinopathy and within East Ayrshire Community Hospital Medical
and General Pharmaceutical. These reduced costs are partially offset by
additional salary costs of the of the GP element of Out of Hours Services, as
well as additional costs of the overnight nursing service. Projected overspend
of £0.374m, with work ongoing to address and bring into line as far as
possible over the course of 2022/23. 
Prison and Police Healthcare - there is a projected underspend of £0.303m
due to reduced new contracts. however there is a review of the prison service
currently being undertaken/ It is expected that these funds will go towards
improving the staff levels within the prison however an underspend of
£0.303m is projected at this early stage of the financial year. 
South HSCP – projected overspend of £0.171m (£0.063m NRAC share for NAHSCP). 
The overspend is mainly due to an overspend in the community store and continence
service offset by vacancies in the Family Nurse Partnership. 
Set Aside: - an approach has yet to be decided on for 22/23, which may be used as
a “shadow year” for using current year activity. This will depend on how representative
the activity is felt to be. By default inflation will be applied to the 2021/22 budget.  
The annual budget for Acute Services is £373.3m.  The directorate is overspent by
£3.1m, caused by increasing overspends on agency medical and nursing staff,
together with increasing drug expenditure. These have been required due to the level
of operational pressure being experienced, in common with many other areas in
Scotland at present.  
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancy causing service pressure
• High numbers of delayed discharges 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
2.13 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2022-23
budget during the year, these include: 
• High risk areas of low volume / high-cost services areas e.g. Learning Disability
care packages, children’s residential placements and complex care packages.
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas

Page 33

Official-Protect
Official-Protect
• The Covid recovery process and re-mobilisation of services, including the
ability to change and improve services following learning from the Covid
response
• The impact and implementation of the National Care Service.
• The Local Government and NHS pay awards are not settled for 2022-23 and
negotiations are ongoing; as outlined in the report the risk is mitigated for the
social care workforce by providing for a 3% increase and for NHS it is
anticipated that additional funding would be allocated if the pay award
settlement is higher than the current assumption
• The current very high levels of inflation
• The review of the Care at Home service which commenced in Spring 2022
• Supported Accommodation - funding has been included in the budget for the
new developments but the adequacy of the funding will only be known when
the final occupants are agreed. 
These risks will be monitored during 2022-23 and the financial impact reported
through the budget monitoring report. 
2.14 COVID-19 – FINANCE MOBILISATION PLAN IMPACT 
Summary of position 
From the outset of the pandemic the HSCP acted very swiftly to respond and
developed a mobilisation plan detailing the additional activities to support our
response, alongside the estimated financial impact.  Financial returns were submitted
to the Scottish Government on a regular basis during 2020-21 and 2021-22, on the
premise that any additional costs aligned to mobilisation plans would be fully funded. 
This process will continue during 2022-23 with returns moving from quarterly to
monthly.  Covid funding of £13.321m was carried forward from 2021-22 for use in
services delegated to the Partnership during 2022-23 and the costs outlined below will
be met from this funding. 
2.15 Mobilisation Plan and Funding Position 
The quarter 1 mobilisation plan cost submission was submitted in July and estimated
the costs to be £4.067m to March 2023.   There was no change to these estimates in
month 4 but the amount for payments to providers will need to increase in month 5. 
The costs remain estimates as the situation continually evolves and there will be a
further update submitted after month 5.   
The local finance mobilisation plan submission is included as Appendix E.  The main
areas of cost are summarised below: 
Service Area Initial Quarter 1 
2022-23  
Return  
£m
Month 4 
2022-23 
Return 
£m
Payments to Providers  1.100  1.100
PPE 0.418 0.418
Additional Staff  1.317  1.317
Loss of Income  0.246  0.246

Page 34

Official-Protect
Official-Protect
Children & Families 0.957  0.957 
Other Areas 0.029 0.029
TOTAL  4.067   4.067 
2.16 Provider Sustainability Payments and Care Home Occupancy Payments 
COSLA Leaders and Scottish Government have agreed an approach to supporting
the social care sector to ensure that reasonable additional costs will be met.   We have
been making payments to commissioned social care providers in line with the agreed
national principles for sustainability and remobilisation payments to social care
providers during COVID 19.  
Care Home Occupancy Payments - The Scottish Government ceased these
payments at the end of October 2021 but exceptions were made following the Omicron
outbreak and limited payments were made to eligible care homes.  Meetings are being
held with each care home to discuss ongoing sustainability and to provide support.   
Sustainability payments – the most recent guidance issued on 22nd June reduces
the scope of what providers can claim for.  The main costs that can be claimed relate
to testing and vaccination and this is extended to 31st March 2023.  The Social Care
Staff Support Fund was also extended to 30th September 2022. 
The sustainability payments are estimated to be a significant cost in our mobilisation
plan and the timely submission and assessment of claims is key to ensuring we can
accurately estimate the financial cost and ensure the costs are reclaimed from the
Scottish Government. 
The breakdown of payments made in 2022-23 up to 31st July 2022 are shown in the
tables below: 
PROVIDER SUMMARY
NCHC
Care
Homes Other Total
Total Number of Providers 17 49 66
Number contacting NAC 16 11 27
Providers Supported to date 16 11 27    
OUTSTANDING CLAIMS
NCHC
Care
Homes Other Total
Total Number of Claims 9 11 20
Value of Claims              303,243  238,382  541,625 
SUPPORT PROVIDED
NCHC
Care
Homes
Other
Services TOTAL   
£ £ £
Occupancy Payments up to 31st
July 2022
81,650 - 81,650

Page 35

Official-Protect
Official-Protect
Staffing 469,081 105,349 574,429
PPE, Infection Control 152,810 41,674 194,483
Other 65,323 4,167 69,489
TOTAL 768,863 151,189 920,052 
2.17 RESERVES 
The IJB reserves position is summarised in the table below with full detail given in
Appendix F. 
The ‘free’ general fund balance of £7.248m is held as a contingency balance, this
equates to around 2.5% of the IJB budget for 2021-22 which is above the lower target
level of 2% and does demonstrate significant progress towards establishing a
contingency reserve of between 2% and 4%. 
£1.486m is held by the Council to support a further repayment of debt at the end of
2022-23 and this is not reflected in the financial projection. This position will continue
into 2023-24 when it is anticipated that the debt will be cleared. 
General Fund
Reserves 
Earmarked Reserves
Total  Debt to
NAC
Free
GF
SG
Funding
Non-SG
Funding                     
£m
HSCP 
£m £m £m £m £m £m
Opening Balance
- 1 April 2022 (2.321) 7.248 23.106 0.699 0.500 29.232 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2022-23 from
within the available resource, thereby limiting the financial risk to the funding partners. 
The estimated costs and funding in relation to the Covid-19 response also require to
be closely monitored to ensure that the IJB can plan for the impact of this and to
ensure that the IJB is in the position to re-claim funding to compensate for the
additional costs. 
3.2 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2022-
23.

Page 36

Official-Protect
Official-Protect
4. IMPLICATIONS 
Financial:  The financial implications are as outlined in the report.  
Against the full-year budget of £280.909m there is a
projected underspend of £0.389m. The report outlines the
main variances for individual services.      
Human Resources: The report highlights vacancy or turnover savings achieved
to date. Services will review any staffing establishment plans
and recruitment in line with normal practice when
implementing service change and reviews as per agreement
with the IJB, there is no intention to sustain this level of
staffing capacity reduction on a recurring or planned basis. 
Legal: None
Equality: None
Children and Young People None
Environmental &
Sustainability:
None 
Key Priorities: None
Risk Implications: Para 2.13 highlights the financial risks. 
The report falls in line with the agreed risk appetite
statement which is a low-risk appetite in respect to
adherence to standing financial instructions, financial
controls and financial statutory duties and a high-risk
appetite in relation to finance and value for money.
Community Benefits: None 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran √ 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
The IJB financial monitoring report is shared with the NHS Ayrshire and Arran Director
of Finance and North Ayrshire Council’s Head of Finance after the report has been
finalised for the IJB. 
6. CONCLUSION 
6.1 It is recommended that the IJB: 
(a)  notes the overall integrated financial performance report for the financial year
2022-23, the overall projected year-end underspend of £0.389m;
(b) notes the progress with delivery of agreed savings;
(c) notes the remaining financial risks for 2022-23;

Page 37

Official-Protect
Official-Protect
(d) approves the budget reductions which are detailed at para 2.11. 
For more information please contact: 
Paul Doak, Head of Finance and Transformation at pdoak@north-ayrshire.gov.uk or
Eleanor Currie, Principal Manager – Finance at eleanorcurrie@north-ayrshire.gov.uk

Page 38

Official-Protect
Official-Protect
2022-23 Budget Monitoring Report–Objective Summary as at 31st July 2022       Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 64,698 63,560 (1,138) 16,471 16,852 381 81,169 80,412 (757) (121) (636)
: Locality Services 28,204 27,772 (432) 5,250 5,330 80 33,454 33,102 (352) (342) (10)
: Community Care Service Delivery 31,239 30,210 (1,029) 0 0 0 31,239 30,210 (1,029) (207) (822)
: Rehabilitation and Reablement 1,987 1,982 (5) 0 0 0 1,987 1,982 (5) 1 (6)
: Long Term Conditions 939 1,102 163 9,110 9,411 301 10,049 10,513 464 472 (8)
: Community Link Workers 182 183 1 0 0 0 182 183 1 0 1
: Integrated Island Services 2,147 2,311 164 2,111 2,111 0 4,258 4,422 164 (45) 209
MENTAL HEALTH SERVICES 31,295 32,021 726 56,449 56,449 0 87,744 88,470 726 1,850 (1,124)
: Learning Disabilities 21,759 22,876 1,117 482 482 0 22,241 23,358 1,117 1,116 1
: Community Mental Health 5,822 5,431 (391) 1,676 1,616 (60) 7,498 7,047 (451) (372) (79)
: Addictions 3,714 3,714 0 1,542 1,512 (30) 5,256 5,226 (30) (30) 0
: Lead Partnership Mental Health NHS Area Wide 0 0 0 52,749 52,839 90 52,749 52,839 90 1,136 (1,046)
CHILDREN & JUSTICE SERVICES 32,467 34,370 1,903 4,024 4,024 0 36,491 38,394 1,903 1,448 455
: Irvine, Kilwinning and Three Towns 3,083 3,082 (1) 0 0 0 3,083 3,082 (1) 4 (5)
: Garnock Valley, North Coast and Arran 2,117 2,117 0 0 0 0 2,117 2,117 0 1 (1)
:Intervention Services 1,773 1,763 (10) 340 340 0 2,113 2,103 (10) (6) (4)
: Care Experienced Children & Young people 21,771 23,685 1,914 0 0 0 21,771 23,685 1,914 1,449 465
: Head of Service - Children & Families 1,195 1,195 0 0 0 0 1,195 1,195 0 0 0
: Justice Services 2,378 2,378 0 0 0 0 2,378 2,378 0 0 0
: Universal Early Years 150 150 0 3,249 3,249 0 3,399 3,399 0 0 0
: Lead Partnership NHS Children's Services 0 0 0 435 435 0 435 435 0 0 0
CHIEF SOCIAL WORK OFFICER 2,584 1,884 (700) 0 0 0 2,584 1,884 (700) (735) 35
PRIMARY CARE 0 0 0 49,530 49,530 0 49,530 49,530 0 0 0
ALLIED HEALTH PROFESSIONALS 0 8,900 8,776 (124) 8,900 8,776 (124) (73) (51)
COVID NHS 0 0 0 528 528 0 528 528 0 0 0
MANAGEMENT AND SUPPORT COSTS 11,134 9,682 (1,452) 2,829 3,061 232 13,963 12,743 (1,220) (1,664) 444
OUTTURN ON A MANAGED BASIS 142,178 141,517 (661) 138,731 139,220 489 280,909 280,737 (172) 705 (877)
Return Hosted Over/Underspends East 0 0 0 0 (29) (29) 0 (29) (29) (368) 339
Return Hosted Over/Underspends South 0 0 0 0 (28) (28) 0 (28) (28) (350) 322
Receive Hosted Over/Underspends South 0 0 0 0 63 63 0 63 63 63 0
Receive Hosted Over/Underspends East 0 0 0 0 (223) (223) 0 (223) (223) 0 (223)
OUTTURN ON AN IJB BASIS 142,178 141,517 (661) 138,731 139,003 272 280,909 280,520 (389) 50 (439)
Over/
(Under)
Spend
Variance at
Period 3
Movement in
projected 
variance
from Period
3
TOTAL
Partnership Budget - Objective Summary
Council Health
2022/23 Budget

Page 39

Official-Protect
2022-23 Transformation Plan               Appendix B 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 3
£
Projected 
Saving 
Projected
Shortfall
21/22
£
Children, Families and Justice
Services
SP/HSCP/20/1 Children and Young People - External
Residential Placements
Monitor and review all placements with a view to
reducing the overspend.
Red Saving -                    -              
SP/HSCP/20/4 Adoption Allowances Montior Adoption Allowances. With a view to reduce
the overspend
Red Saving 59,535         -                    59,535        
SP/HSCP/20/19 Fostering - reduce external
placements.
Monitor Fostering Placements with a view to reduce
the overspend
Red Saving -                    -              
Transport review Review of costs relating to taxi utilisation and
implemenation of new electronic form.  Aim to reduce
transport budget in council.  Links in with David
Hammonds Tranformation Project.
Red Saving
Grow internal fostering capacity Review capacity of existing foster carers with a view
of increasing existing capacity
Amber Cost neutral
NACSTA4030 Fostering Short Breaks Develop an inhouse short break service to replace
the commisioned service provided by Cornerstone.
Amber Saving -                    -               -              
Mental Health and LD
Transformation of CAMHS - CAMHS
Specification
CAMHS have reviewed and updated referral
guidance to align with the CAMHS National
Specification. Some risks identified in order to
facilitate the continued changes are accommodation,
and recruitment of clinical staff.
Amber Investment     1,091,463
Transformation of CAMHS - CAMHS
Age 25
CAMHS are developing specific pathways to provide
care and support up to the age of 25 where
appropriate e.g. Eating Disorders, Neuro, Personality
Disorders, Early Psychosis.
Amber Investment       623,402
Transformation of CAMHS - CAMHS
Waiting List
Two external providers have been procured to
support Neuro waiting for assessment (Purple House
Amber Investment       311,701

Page 40

Official-Protect
Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 4
£
Projected 
Saving 
Projected
Shortfall
21/22
£
Transformation of CAMHS - CAMHS
Psyc Waiting List
Clinical Director & Senior Manager agreed plan in
order to reduce access to Psychiatry.  In addition to
this, 3 non-medical prescribers have been trained
and are prescribing for ADHD clinics.
Amber Investment       366,707
Transformation of CAMHS - Out of
Hours Unscheduled Care
Recruitment and implementation of a new service to
provide support to children and young people on an
unscheduled basis.  CAMHS are being
commissioned by Paediatrics to deliver this service
via Scottish Government funds.
Amber Investment         86,294
Transformation of CAMHS - CAMHS
Intensive Home Treatment
Recruitment is ongoing.  Accommodation required to
house team together. Ongoing development of
policies and procedures for team in alignment with
partners agencies
Amber Investment         14,752
Transformation of CAMHS - CAMHS
Liaison
Amber Investment       129,073
Primary Care Mental Health investment Creation of a business case to deliver Mental Health
to Primary Care over the next 4 years.  Allocation of
funds will be incrementally incraesed over the
duration of the next four years.  North leading for
Ayrshire.
Green Investment       261,159
Continued review of models of care at
Woodland View
A particular focus on rehabilation models of care for
MH building on learning from Warrix Avenue. 
Development of a business case for ARBD is also
underway.  A test of change for ward 7B will be
reported through this workstream.
Amber
Implementation of MAT standards Programme of work to set up the systems required to
report on Medical Assisted Treatment standards for
Addictions.  The programme will be run on a  pan
ayrshire basis led by North.  The national direction
was for this to be led by Public Health but they have
not started any recruitment so North will take forward
in the meantime.
Green Investment
Complex Care Model - Independent
living change fund
Recruit the Intensive Support Team agreed through
this fund and monitor progress of assessments of
out of area placements.  A dynamic register should
be developed and maintained which will feed into
national data.
Amber Investment       513,000
ACORN business model Mental Health Rehabilitation service needing help to
transition to a social enterprise.  Now incoporated
within Caring for Ayrshire.
Red Saving -              -                    -                  -              
Implementation of Trakcare Patient
Management System in Community
Services
Implementation of new information recording system
for NHS to report on 18 weeks RTT.  This will include
development of new processes and transfer of data
from current system to the new one.  This will allow
for better recording of clinical activity and inform
future DCAQ work.  Adult community mental health
will go live first followed by other community teams
currently utilisating Access databases.  A Pan
Ayrshire referral management service will be set up
Green Cost neutral
Implementation of Unscheduled Care Part of the national redesign of urgent care work.
The aim of the mental health project is to deliver an
integrated system to support mental health and
wellbeing by utilising existing mental health services
and enhancing their pathways for unscheduled
Green Investment

Page 41

Official-Protect
Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 4
£
Projected 
Saving 
Projected
Shortfall
21/22
£
Health and Community Care
TEC Solutions To appoint a temporarory 'Project Manager' post,
who will oversee the procurement and installation of
digital telecare equipment
Green Investment         50,000 -               -              
Analogue to Digital Funding received for a Project Manager to manage
the process of moving all services users from
analogue to digital technology.
Amber Investment       996,000
SP/HSCP/20/17 Care at Home - Service Review This project will incorporate the review of the care at
home job role and any implications for service as a
Amber Investment -               -              
Hospital Team Model Green
Arran Integrated Services model Continue to work towards an Integrated Hub on
Arran building on the frailty work and developing a
single point of contact for all health and social care
services. It is anticipated there will be a substantial
amount of investment required and a business case
will be developed.
Green
Primary Care Investment Fund Remodel how we deliver primary care locally,
ensuring that multi-disciplinary teams are available in
each medical practice across North Ayrshire. This
will help ensure that when needed local people will
get the right care and support they need
Green Investment
HSCP MDT - Community Health &
Care
Implement HSCP MDTs across each of the localities
to support GP practices and HSCP service
coordinate care for those with the most complex
needs. This approach will replace Older People
Local Operational Teams.’
Develop Care at Home - Minimum data
set
Scope all current recording processes for data and
look to consolidate a dataset that can be used for all
reporting needs.
Cost neutral
AHP Whole System redesign
Build on the learning from the recent AHP workforce
exercise; to better understand the distribution and
contribution of AHPs in health and care in North Ayrshire,
to support future workforce planning that maximises this
contribution for the benefit of the people of North
Amber
Interim Beds To utilise a one-off lump sum, provided by the
Scottish Government, to provide interim beds, for a
maximum of 6 weeks, for clients who will have an
onward move to permanent care.
Green

Page 42

Official-Protect
Official-Protect 
Savings
reference
number
Project Project Description Deliveribility
Status
Saving/
Investment
Approved
Saving              
2022/23
£
Investment Saving
Delivered at
Month 4
£
Projected 
Saving 
Projected
Shortfall
21/22
£
Partnership Wide
Supported acc models - NAC housing/
Sleepover/ outreach model
Continue working with third sector providers to
implement supported accommodation models in the
Green Saving -                  -              
SDS Review Engage with all stakeholders to look at how we
encourage a more innovative and person centred
approach to SDS.  Implement an SDS Review
Learning Board to help progress. Carers Review Develop a resource release model for allocation of
funds for carers as well as implement a short break
service.
Amber Saving -                    -                  -              
Adult Complex Care Model - Call
Monitoring
Review of call monitoring system for provision of
adult community supports.  This will include
evaluation of current provision and development of  a
specification for future tender as the current contract
is due to expire.
Implementation of Eclipse information
system
Implementation of new information recording system
for social care to replace Care First.  This will include
dedvelopment of new protocols and transfer of data
from current system to the new one.
Money matters and GP Practice
Welfare Rights service
Facilitate the introduction of a money advise service
available within GP practices.
Investment         78,000
Payroll Turnover Inflation Monitor  slippage through staff turnover with a  view
to meeting the savings target.
Saving 301,201       301,201            -                                     -
Business Support Review (linked to
Care at home review)
Scope and review the remit of the business support
unit and how it could be adapted to the benefit of all
HSCP teams.
North Elderly Mental Health inpatients
(lead partnership)
Agree the spend going forward for the recurring
savings achieved through bed retraction from Ailsa.
Saving 321,000       321,000            -                                     -
HSCP  Challenge Fund - invest to save Monitoring of all projects approved through the
Challenge Fund with a focus on invest to save ideas.
Transitions Improve transition pathways from Childrens to Adult
services as well as into older adults in order to
improve outcomes for service users.
Caring for Ayrshire The focus for Caring for Ayrshire is to bring a greater
proportion of health provision into local communities.
The Caring for Ayrshire work will ensure local GP
practices are fit for purpose and have the capacity to
host multi-disciplinary teams and meet local health
and care needs.
Investment
Advocacy Strategy Refresh of Advocacy strategy with a view to
incorporating both adult and childrens services.
Cost neutral

Page 43

Official-Protect
Official-Protect 
2022-23 Savings Tracker            Appendix C 
Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 4
Saving
Delivered @
Month 4                   
£m
Projected to
Deliver during
Year                        
£m
Projected
Shortfall                
£m
Comment
1 Adoption Allowances Amber 0.060 Amber                    -                  0.060                     -   Currently projecting an overspend. 
TOTAL SOCIAL CARE SAVINGS 0.060 0.000 0.060 0.000
Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 4
Saving
Delivered @
Month 4                   
£m
Projected to
Deliver during
Year                        
£m
Projected
Shortfall                
£m
Comment
2 Payroll Turnover Inflation Green 0.302 Blue 0.302                    -   Achieved
3 Elderly Mental Health inpatients (lead partnership) Green 0.321 Blue 0.321                    -                       -   Achieved
TOTAL HEALTH SAVINGS 0.623 0.623 0.000 0.000
TOTAL NORTH HSCP SAVINGS 0.683 0.623 0.060 0.000

Page 44

Official-Protect
2022-23 Budget Reconciliation               Appendix D 
COUNCIL Period  Permanent or
Temporary £'m
Initial Approved Budget     116.017
Base budget adjustments 1   (0.046)
Uploaded Budget     115.971
Resource Transfer 1 P 26.228
Software Licences transfer to IT 3 P (0.002)
Montrose Cleaning Post to Facilities
Management 3 P (0.014)
Software Licences transfer to IT 4 P (0.003)
Roundings     (0.002)
Budget Reported at Month 4 142.178    
HEALTH Period  Permanent or
Temporary £'m
Initial Approved Budget     163.988
Resource Transfer     (26.228)
Month 10-12 Adjustments     22.401
Adjust for Non-recurring funding     (22.408)
Full Year effect of Part Year Reductions     0.128
REVISED 22-23 BUDGET     137.881
Training Grade Adj - April 1 P (0.064)
Vire No 2 - East to North CAMHS Admin 1 P 0.099
Band 2-4 SG Funding reduction 1 P (0.007)
AHP Clinical Admin Budget Transfer 2 P 0.048
Dean Funding to Partnerships 2 P 0.085
Prescribing Uplift 2 P 1.631
Prescribing Cres 2 P (0.715)
Prescribing out non schedule 5 2 P (0.429)
Scottish Huntingtons Post 3 P 0.014
Daldorch Income Shortfall 3 P 0.045
Community Store Contributions 3 P (0.006)
Iona/Lewis Patient to South 3 T (0.046)
Marie Curie contract uplift 3 P (0.004)
Trakcare/Huntingtons/ Daldorch 3 P 0.086
Staff Wellbeing Posts from OH&RD 4 P 0.193
Top Slicing Posts- Prescribing 4 P (0.071)
Admin Post transferred to Medical Records 4 T (0.034)
Naloxone for Police Scotland 4 T 0.026
Roundings 4   (0.001)
Budget Reported at Month 4 138.731    
COMBINED BUDGET MONTH 4 280.909

Page 45

Official-Protect
Appendix E
Mobilisation Submission – Month 4 
Covid-19 Costs - HSCP - All
Workstream Mapping £000s April May June July August September October November December January February March 2022-23 Revenue
Total
1. Public Health Scale up of Public Health Measures 0 0 0 0 0 0 0 0 0 0 0 0 0
2. Vaccinations Flu Vaccination & Covid-19 Vaccination (FVCV) 0 0 0 0 0 0 0 0 0 0 0 0 0
3. Workforce and Capacity Additional Community Hospital Bed Capacity 0 0 0 0 0 0 0 0 0 0 0 0 0
3. Workforce and Capacity Additional Staff Costs (Contracted staff) 36 50 65 179 105 105 105 105 105 105 105 31 1,096
3. Workforce and Capacity Additional Staff Costs (Non-contracted staff) 51 49 47 0 0 0 0 0 0 0 0 0 147
4. PPE, Equipment and IPC Additional Equipment and Maintenance 0 0 0 0 0 0 0 0 0 0 0 0 0
4. PPE, Equipment and IPC Additional Infection Prevention and Control Costs 0 0 0 0 0 0 0 0 0 0 0 0 0
4. PPE, Equipment and IPC Additional PPE 27 27 27 38 38 38 38 38 37 37 37 37 418
4. PPE, Equipment and IPC PPE Hub Running Costs 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Additional Capacity in Community 9 9 10 0 0 0 0 0 0 0 0 0 28
5. Social Care and Community Capacity Additional Care Home Placements 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Adult Social Care 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Children and Family Services 79 79 79 80 80 80 80 80 80 80 80 80 957
5. Social Care and Community Capacity Homelessness and Criminal Justice Services 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Reducing Delayed Discharge 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Covid-19 Financial Support for Adult Social Care Providers 178 178 178 188 188 189 0 0 0 0 0 0 1,100
5. Social Care and Community Capacity Social Care Support Fund Claims 0 0 0 0 0 0 0 0 0 0 0 0 0
5. Social Care and Community Capacity Chief Social Work Officer 0 0 0 0 0 0 0 0 0 0 0 0 0
6. Primary Care Additional FHS Contractor Costs 13 13 13 12 12 12 0 0 0 0 0 0 75
6. Primary Care Primary Care 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Digital & IT costs 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Loss of Income 41 41 41 41 41 41 0 0 0 0 0 0 246
7. Miscellaneous Other (0) 0 (0) 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Payments to Third Parties 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Staff Wellbeing 0 0 0 0 0 0 0 0 0 0 0 0 0
7. Miscellaneous Patient Transport 0 0 0 0 0 0 0 0 0 0 0 0 0
434 447 460 538 464 465 223 223 222 222 222 148 4,067Total Covid Costs - HSCP - All

Page 46

Official-Protect
Appendix F 
Reserves Position in Detail 
Earmarked Funds  
: Alcohol & Drug Partnership 890
: Mental Health Action 15 511
: Primary Care Improvement Fund 1,856
: 21-22 Budget Gap 0
: Challenge Fund 500
: Community Living Change Fund 513
: Covid19 Funding 13,321
: Neighbourhood Networks 145
: Mental Health Officer Development Grant 41
: NAC Recovery and Renewal – Mental Health
Element
71
: Joint Equipment 5
: Nethermains Adaptations 40
: Supported Accommodation 50
: Care at Home Capacity 1,192
: Interim Care 1,046
: Trauma Training 50
: Trauma Trainer 48
: Family Wellbeing Fund 106
: Perinatal MH Nurse 65
: Unaccompanied Asylum-Seeking Children 11
: Multi-Disciplinary Teams 644
: Health Care Support Workers 144
: MH Recovery and Renewal  2,057
: Medical photography 4
: Data Sims 28
: School Nursing  56
: Buvidal 109
: AHP Winter Funding 51
: Perinatal and Infant Mental Health 86
: Cossette Funding 18
: Replacement Mattress Programme 78
: Expansion of Primary Care Estates 55
: GP Premises Improvements - tranches 1 and 2 81
: Mental Health Wellbeing in Primary Care 40
: Dental Practice Improvement 265
: Dental Winter Preparedness 128
Total Earmarked 24,305
Outstanding Debt (2,321)
Unallocated General Fund  7,248
General Fund 29,232