NORTH AYRSHIRE COUNCIL 
19 March 2024 
Cabinet 
Title:    Revenue Budget 2023/24 : Financial Performance to 31
January 2024 
Purpose:  To advise Cabinet of the financial performance for the Council
at 31 January 2024. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; and 
(c)  approve the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2023/24 were approved by Council on 1
March 2023. The Housing Revenue Account (HRA) Revenue Budget for 2023/24 was
approved by Council on 15 February 2023. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the fourth report for 2023/24 and covers the period to the end of January
2024 (Period 10). Projections have been made to the year-end. 
1.3   At Period 10 the General Fund is forecasting a net in-year overspend of £0.146m,
(0.0%), after transferring resources to/from earmarked reserves. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£6.170m),
(10.6%). 
1.5  At the end of January 2024, the Health and Social Care Partnership is projecting a
year-end overspend of £4.171m, (1.3%), for 2023/24. This is an increase of £0.313m
from the previously reported position. The Council services element is reporting a
projected overspend of £3.353m, an increase of £0.853m, and the Health services
element reported a projected overspend of £0.818m, a reduction of £0.540m from the
previously reported position.

Page 2

1.6 Ongoing risks to the reported position have been identified arising from inflationary
pressures across services, linked to the higher than anticipated Consumer Price Index
with particular issues identified in relation to external residential childcare placements
and teacher absence cover costs. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2023/24. In addition to the budget approved
on 1 March 2023, earmarked funds of £26.697m were carried forward from 2022/23
for service expenditure in 2023/24 and are reflected in the figures within the 2023/24
financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year overspend of £0.146m, (0.0%),
net of transfers to/from reserves, is anticipated for the year to 31 March 2024. 
2.3 Details of the current financial projections are summarised in the following table: 
Appendix
No
Annual
Budget
Projection
to  31
March 2024
Projected
Variance
for year
(Fav)/Adv
Projected
Variance @
Period 8 
(Fav)/Adv Movement Note
Service Expenditure £000's £000's £000's £000's £000's
Chief Executives 1 21,776     20,912      (864)        (684)           (180)        (i)
Communities 2 189,773   190,460     687         820            (133)        (ii)
Place 3 58,886     60,390      1,504       1,150         354         (iii)
Other Corporate Services 4 15,613     14,385      (1,228)      (1,053)        (175)        (iv)
Sub Total 286,048   286,147     99           233            (134)       
Health and Social Care
Partnership 8 123,862   123,862     -              -                -              2.6
Balance for Services 409,910   410,009     99           233            (134)       
Financing Charges 5 12,947     12,947      -              -                -             
Contribution to Loans Fund
Reserve 5 5,699       5,699        -              -                -             
Total Planned Expenditure 428,556   428,655     99           233            (134)       
Planned Income
Aggregate External Finance 5 (353,004)  (353,004)    -              -                -             
Council Tax 5 (65,382)    (65,335)     47           31              16          
Use of Earmarked Funds 5 (10,170)    (10,170)     -              -                -             
Total Planned Income (428,556)  (428,509)    47           31              16          
Net Expenditure/ (Income) -              146           146         264            (118)

Page 3

2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that included in the approved budget, as detailed in the
following table: 
2.5 Commentary on Significant Movements from the Approved Budget 
The Council's overall financial forecast against the revised budget is a net overspend 
position. This includes a number of movements at a service level. Detailed
explanations of the significant variances in service expenditure compared to the
approved budgets are provided in appendices 1 to 5 to this report. 
A brief explanation of the significant movements for each service since Period 8 is
outlined as follows: 
(i) Chief Executive’s – underspend of (£0.864m), an increase of (£0.180m) from
the previously reported underspend 
The movement since Period 8 is primarily related to: 
• Vacancy management across services, (£0.101m); and
• Lower than forecast contract renewal costs within ICT, (£0.073m). 
(ii) Communities – overspend of £0.687m, a reduction of (£0.133m) from the
previously reported overspend 
The movement since Period 8 reflects updated cost pressures across services,
including: 
• Vacancy management across services, including increased teacher turnover,
(£0.846m); and
• Additional income in relation to children from other local authorities accessing
placements, (£0.083m). 
These have been partly offset by: 
• Additional teacher cost overspend within Primary Schools, £0.685m; and
• Increased PPP utility expenditure, £0.116m.
Non Domestic
Rates
Specific
Grants TOTAL AEF
Planned Income £000's £000's £000's
Revised Budget 30 November 2023 (287,858)       (40,982)         (19,940)         (348,780)      
Movements:
SJC Pay Settlement 23-24 (4,136)           (4,136)          
Teacher Induction Scheme (80)               (80)              
Self Directed Support (5)                 (5)                
Climate Intelligence Adjustment 10                10               
Education Psychologist (15)               (15)              
Rounding Adjustment 2                  2                 
Revised Planned Income (292,082)       (40,982)         (19,940)         (353,004)      
General Revenue
Grant
£000's

Page 4

(iii) Place – overspend of £1.504m, an increase of £0.354m from the previously
reported overspend 
The movement since Period 8 reflects updated income and cost forecasts across
services, including: 
• Additional property costs associated with essential statutory compliance works
and contract inflation, £0.394m; and
• Lower than anticipated income from property rents and advertising, £0.112m. 
These have been partly offset by a rebate on Community Hub recharges,
(£0.087m). 
Virements in relation to the recognition of additional income within Roads and
Employability have been included within Appendix 7. 
(iv) Other Corporate Items – underspend of (£1.228m), an increase of (£0.175m)
from the previously reported underspend 
The movement since Period 8 is primarily related to lower than anticipated
drawdowns from centrally held inflationary cost provisions to support pressures
within services, (£0.191m). 
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of January 2024 is
attached at Appendix 8. The HSCP report highlights the key challenges and variances
for the Partnership. 
The key points for Cabinet to note are summarised as: 
• The projected outturn is a year-end overspend of £4.171m for 2023/24.
• The projected overspend on the Council Services element is £3.353m, with a
projected overspend on the Health Services element of £0.818m;
• The projected overspend for 2023/24 will be funded by IJB reserve balances  -
£2m has been earmarked to support the 23/24 financial position and any
overspend above this level will be met from the unearmarked balance. This will
contain the financial risk within the IJB but is likely to reduce the unearmarked
balance below the recommended level of 2%;
• The most significant areas of overspend include residential placements for
children, supplementary staff in wards and unplanned activities within the lead
partnership for mental health. A substantial programme of work is being
progressed by the HSCP in partnership with colleagues in Education and
Housing, to develop a plan to reduce the number of Children’s Residential
Placements. Further detail is included in the report at Appendix 8.

Page 5

The main areas of risk identified in the report included: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers;
• High risk areas of low volume / high-cost services areas e.g. Children’s residential
placements, Learning Disability care packages and complex care packages; 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this;
• Ongoing implementation costs of the Scottish Government policy directives;
• Lead / hosted service arrangements, including managing pressures and reporting
this across the 3 IJBs;
• The impact on Lead Partnership and acute services from decisions taken by other
Ayrshire areas;
• The use of supplementary staffing for enhanced observations across a number of
service areas;
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges;
• Continuing risks associated with provider sustainability; and
• The NHS Ayrshire and Arran Health Board financial deficit and the risks around
further escalation in the national framework for financial escalation.  North
Ayrshire IJB have already discussed our position in relation to the request for
payment for delayed discharges. 
These risks will continue to be monitored during the remainder of the financial year. 
Risks 
2.7 Ongoing risks to the reported position have been identified arising from inflationary
pressures in relation to essential commodities, including food and utilities. In June
2023, Cabinet agreed to earmark £0.870m from the 2022/23 underspend to address
unbudgeted inflationary pressures arising from the ongoing cost of living crisis. Any
further increases beyond current budget provision may impact on future service
provision. 
Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2023/24 and an
in-year underspend of (£6.170m), (10.6%), is currently anticipated for the year to 31
March 2024. The projected position is summarised in the following table with further
details provided in Appendix 6.

Page 6

2.9 Commentary on Significant Movements from the Approved Budget 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Employee Costs – underspend of (£0.463m), an increase from the previously
reported underspend of (£0.168m) 
The movement is primarily related to vacancy management across the service. 
(ii) Property Costs – overspend of £1.438m, a reduction from the previously
reported overspend of (£0.154m) 
The movement is primarily related to reduced expenditure on Planned & Cyclical
Maintenance, (£0.173m), and Responsive Repairs, (£0.113m), partly offset by
increased expenditure on Void Repairs, £0.061m, and Other Property Costs,
£0.117m. 
(iii) Capital Financing Costs – underspend of (£7.059m), a reduction from the
previously reported underspend of £0.068m 
The movement is related to revised capital charges reflecting movements in the
HRA Capital Programme. 
(iv) Income – underrecovery of £0.044m, a reduction from the previously
reported underrecovery of (£0.503m)
The movement is primarily related to updated income from temporary
accommodation rents and service charges, (£0.538m).  
Annual
Budget
Projection to 
31 March
2024
Projected
Variance for
year
(Fav)/Adv
Previous
Variance @
Period 8       
(Fav)/Adv Movement Note
£000's £000's £000's £000's £000's
Employee Costs 5,504        5,041          (463)             (295)           (168)          (i)
Property Costs 22,718      24,156        1,438           1,592          (154)          (ii)
Supplies and Services 671          691             20               14              6             
Transport and Plant Costs 28            28              -                  -                 -              
Administration Costs 1,892        1,918          26               7                19            
Third Party Payments 3,519        3,343          (176)             (180)           4             
Transfer Payments 172          172             -                  -                 -              
Other Expenditure 380          380             -                  -                 -              
Capital Financing 23,309      16,250        (7,059)          (7,127)         68             (iii)
Gross Expenditure 58,193      51,979        (6,214)          (5,989)         (225)         
Income (58,193)     (58,149)       44               547            (503)          (iv)
Net Expenditure -               (6,170)         (6,170)          (5,442)         (728)

Page 7

3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a)  note the information and financial projections outlined in the report; 
(b)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; and
(c)  approve the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 31 January 2024 is a net overspend of £0.146m. 
Housing Revenue Account
The net projection for the year as at 31 January 2024 is a net underspend of
(£6.170m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None.

Page 8

5. Consultation 
5.1 Progress as outlined in this report has been approved by the Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2023/24 : Financial Performance to 30 November 2023 – Cabinet 24
January 2024

Page 9

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 159              163              4                     3%
Total for Chief Executive 159              163              4                     3%
Financial Services
Change Programme 294              294              -                      0%
Audit, Fraud, Safety & Insurance 1,062           1,073           11                   1%
Corporate Procurement 1,040           987              (53)                  (5%) 1         
Financial Services 1,541           1,511           (30)                  (2%) 2         
Revenues (462)             (609)             (147)                32% 3         
Transformation 786              761              (25)                  (3%) 4         
Total for Financial Services 4,261           4,017           (244)                (6%)
People & ICT
Employee Services 980              980              -                      0%
HR & Organisational Development 1,115           1,113           (2)                    (0%)
ICT 5,550           5,177           (373)                (7%) 5         
Business Support 1,373           1,373           -                      0%
Customer Services 4,195           4,189           (6)                    (0%)
Total for People & ICT 13,213         12,832         (381)                (3%)
Democratic Services
Legal & Licensing 604              510              (94)                  (16%) 6         
Policy, Performance & Elections 530              411              (119)                (22%) 7         
Communications 498              502              4                     1%
Civil Contingencies 60                60                -                      0%
Committee Services 569              564              (5)                    (1%)
Member Services 1,340           1,339           (1)                    (0%)
Ayrshire Support Service 484              464              (20)                  (4%) 8         
Information Governance 58                50                (8)                    (14%)
Total for Democratic Services 4,143           3,900           (243)                (6%)
Totals 21,776         20,912         (864)                (4%)

Page 10

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 18,502         18,185         (317)                (2%)
Property Costs 68                85                17                   25%
Supplies and Services 3,419           3,099           (320)                (9%)
Transport and Plant Costs 23                19                (4)                    (17%)
Administration Costs 1,356           1,330           (26)                  (2%)
Other Agencies & Bodies 2,342           2,340           (2)                    (0%)
Transfer Payments 852              853              1                     0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 26,562         25,911         (651)                (2%)
Income (4,786)          (4,999)          (213)                4%
Net Expenditure 21,776         20,912         (864)                (4%)

Page 11

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement - There has been a favourable movement of £0.019m since P8 due to vacancy management.
1,070 (60) -6% Employee costs - There is a projected underspend of £0.061m due to vacancy management. 
7 Other minor movements
(53)                 
Note 2 Finance - Financial Services
Movement - There has been a favourable movement of £0.030m since P8 due to vacancy management.
1,518 (30) -2% Employee costs - There is a projected underspend of £0.030m due to vacancy management. 
(30)                 
Note 3 Finance - Revenues
Movement - There has been no movement from P8.
(1,289) (147) 11% Income - There is a projected over recovery in Council Tax Statutory Additions of £0.077m and agreed revised
Scottish Water income resulting in a £0.070m over recovery.
(147)               
Note 4 Finance - Transformation
Movement - There has been a favourable movement of £0.025m from P8 due to external funding.
691 (25) -4% Employee Costs - There is a projected underspend of £0.025m due to salaries being paid by external funding
in the year.
(25)                 
Note 5 People & ICT - ICT
Movement - There has been a favourable movement of £0.125m from P8 due to lower than forecasted contract
renewal costs and various management vacancies.
3,513 (52) -1% Employee Costs - Projected underspend of £0.052m due to various management vacancies.
2,248 (321) -14%
Supplies & Services -  There is a £0.239m underspend in software licenses and support due to contracts
ending and renewing at a lower cost.  There is also a £0.045m underspend in WAN due to the upgrade project
and £0.036m underspend in LAN due to lower costs than anticipated.
(373)               
Note 6 Democratic Services - Legal & Licensing
Movement - There is an adverse movement of £0.032m from P8, this is primarily due to a decrease in
projected Licence income.
1,185 (34) -3% Employee Costs - There is a projected underspend of £0.034m due to vacancy management.
(735) (73) 10%
Income - There is a projected over-recovery of £0.089m in Licensing income mainly due to new licence income
for Short Term Lets, which is partally offset with an under recovery of £0.017m in Recovery of Legal Costs.
13 Other minor movements
(94)                 
Note 7 Democratic Services - Policy, Performance & Elections
Movement - There is an adverse movement of £0.031m from P8 due to revised payroll projections.
512 (123) -24% Employee Costs - There is a projected underspend of £0.123m due to vacancy management.
4 Other minor movements
(119)               
Democratic Services - Information Governance
Movement - There is a favourable movement of £0.031m since P8 due to revised payroll projections.
499 (23) -5% Employee Costs - There is a projected underspend of £0.023m due to vacancy management.
3 Other minor movements
(20)                 
Note 8

Page 12

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 21,837         21,178            (659)                (3%) 1         
Primary Education 50,042         50,333            291                 1% 2         
Secondary Education 63,152         63,124            (28)                  (0%) 3         
Additional Support Needs 14,137         14,833            696                 5% 4         
Education - Other 2,105           3,339              1,234              59% 5         
Pupil Equity Fund 4,614           4,614              -                      0%
Facilities Management 19,181         18,334            (847)                (4%) 6         
Connected Communities 14,705         14,705            -                      0% 7         
Net Total 189,773       190,460          687                 0%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 96,479         98,702            2,223              2%
Employee Costs - Non Teachers 61,711         59,676            (2,035)             (3%)
Property Costs 1,802           1,938              136                 8%
Supplies and Services 24,929         24,577            (352)                (1%)
Transport and Plant Costs 152              166                 14                   9%
Administration Costs 597              561                 (36)                  (6%)
Other Agencies & Bodies 15,004         15,909            905                 6%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 71                71                   -                      0%
Gross Expenditure 201,325       202,180          855                 0%
Income (11,552)        (11,720)           (168)                1%
Net Expenditure 189,773       190,460          687                 0%

Page 13

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been a favourable movement of £0.132m compared to P8. This is primarily due to
turnover and vacancy management.
16,917 (449) -3% Employee Costs: Projected underspend of £0.449m in establishments due to vacancy management.
4,672 (168) -4%
Third Party Payments: There are forecasted underspends of £0.304m in payments to funded providers and
£0.028m in payments to other bodies for current registered children. Payments to other Local Authorities is
projected to be an overspend of £0.154m as more children are expected to take up Early Years places outwith
North Ayrshire than children coming into NAC Early Years establishments.
248 (42) -17% Other minor movements
A reduction to the budget of £1.198m in 23/24 has necessitated a drawdown from Education earmarked funds
pending permanent savings to be implemented for 24/25. Service redesign proposals are being developed.
(659)
Note 2 Primary Education
Movement : There has been a unfavourable movement of £0.685m compared to P8 primarily due to increased
employee costs
47,666 261 1% Employee Costs : projected overspend in teacher costs of £0.705m offset against underspend in non teaching
costs across all Primary Schools of £0.444m
2,183 41 2% Supplies & Services: projected overspend in the PPP unitary charge mainly due to NDR and utility increases
(11) Other minor movements
291
Note 3 Secondary Education
Movement : There has been a unfavourable movement of £0.116m compared to P8 mainly due to an increase
in the reported PPP costs
48,396 (229) 0% Employee Costs : projected underspend in non teaching costs across all Secondary Schools
14,590 193 1%
Supplies & Services: projected overspend in the PPP unitary charge mainly due to NDR and utility increases.
All PPP costs and income will be monitored over the coming months and the final outturn will be dependent on
potential further penalty deductions to offset the overspend.
8 Other minor movements
(28)
Note 4 ASN
Movement: There has been a favourable movement of £0.125m compared to P8. This is mainly due to a
£0.037m increase in employee costs underspends and a projected increase of £0.083m in Other Local
Authority section 23 income due to increased rates being applied for the 2023/24 session and an additional out
of authority child accessing a place in NAC.
12,442 (334) -3%
Employee costs:  Projected underspend of £0.273m in non teaching staff costs across all ASN school and
bases provision and £0.061m forecasted underspend in teaching costs. The increased cost pressure for
Classroom Assistants of £0.874m is managed this year by drawing down a temporary amount from earmarked
funds. This position will be addressed as part of the ongoing discussion with the Scottish Government and as
part of the 24/25 budget process.
355 (65) -18% There is a forecasted underspend of £0.065m on payments to Other Local Authorities due to a reduction in the
number of NAC children accessing placements in their establishments.
1,003 135 13% There is a projected overspend of £0.135m on external day placements as a result of additional children
requiring this level of support and an increase in rates from these establishments.
499 1,048 210%
There is a projected overspend of £1.048m on external specialist residential placements.  Currently there are
15 children in, or expected in, accommodation.  Increased pressures on internal care settings as well as
changing needs of children and young people have resulted in an increase in the need for external residential
settings. Joint working is ongoing with HSCP to ensure that all options are fully explored to ensure that all
options are considered to retain young people within their local community where possible.  Where this is not
possible, a forum has been set up to further discuss those young people who will require care and education
provision to support them appropriately. Any future additional children who enter Residential Accommodation
will increase the future projected overspend.
(264) (100)
There is a projected over recovery of £0.100m in Other Local Authorities income due to the number of other
authority children accessing a place in NAC establishments and increased rates being applied for the 2023/24
session.
- 12 Other minor movements.
684

Page 14

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Education Other
Movement :There has been a favourable movement of £0.596m compared to P8. This is mainly due to a
projected increase in teacher turnover.
977 1,497 153%
Employee costs: mainly as a result of significant increase in costs associated with mandatory cover for teacher
absence. Absence levels are subject to regular review across the service and appropriate actions are taken to
maximise attendance
(1,184) (271) 23% Income: PPP insurance rebate £0.098m, PPP deductions of £0.148m in excess of budget, £0.024m salaries
received from capital
8 Other minor movements.
1,234
Note 6 Facilities Management
Movement: There has been a favourable movement of £0.081m compared with P8 mainly due to vacancy
management.
15,750 (372) -2% Employee Costs: There is an underspend of £0.372m primarily due to recruitment challenges and a targeted
reduction of overtime and casual costs.
5,116 (701) -14%
Supplies and services: There is a saving of £0.257m due to lower school meal uptake. In addition, there is an
underspend within Early Years of £0.463m which has arisen due to lower attendance rate than anticipated.
(2,798) 177 -6%
Income: There is an under-recovery in commercial catering income of £0.258m due to a reduction in
commercial events and cost/income challenges within commercial venues. This is partially offset by an over-
recovery of cleaning and janitorial income of £0.100m.
48 Other minor movements
(847)
Note 7 Connected Communities
Movement: There has been no change since period 8.
8,649 (185) -2% Employee Costs: Underspends in Community Facilities, Libraries, Country Parks, Community Development
and Arran Outdoor due to vacancy management.
500 87 17%
Property Costs: £0.033m overspend in Libraries, £0.030m overspend in Country Parks on various property
works and removal of trees affected by ash dieback, £0.019m overspend in Community Facilities, which is
partly on cleaning materials, and £5k overspend in Arts.
1,154 109 9% Supplies and Services: Overspend in Arts events costs, which is offset by an over-recovery of income, and
small overspends in a number of budget lines across the service.
(2,204) (17) 1%
Income: £0.018m under recovery in Community Facilities as income has not returned to pre-covid levels and
projected over-recovery of £0.007m in Arran Outdoor Education Centre, £0.004m in Country Parks and
£0.021m in Arts.
6 Other minor movements.
-
General
Due to the industrial action taken by various staff there is a underspend of approximately £200k across all
sectors. This underspend is included in all non teaching employee budget lines across the entire Communities
budget monitoring report. A further £20k of underspend was made against grant funded services SEF and
PEF.

Page 15

Appendix 3
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 206              206               -                     0%
Housing and Public Protection
Building Services (2,542)          (2,542)           -                     0% 1         
Property Governance (7)                 (7)                  -                     0%
Planning Services 371              217               (154)               (42%) 2         
Protective Services 1,912           1,800            (112)               (6%) 3         
Other Housing 3,236           3,196            (40)                 (1%) 4         
Total for Housing and Public Protection 2,970           2,664            (306)               (10%)
Neighbourhood Services
Roads 6,968           6,968            -                     0%
Streetscene 5,834           5,866            32                   1% 5         
Waste Resources 10,125         10,720          595                 6% 6         
Municipalisation Advertising (123)             (21)                102                 (83%) 7         
Total for Neighbourhood Services 22,804         23,533          729                 3%
Economic Development, Growth and
Investment
Economic Policy 213              149               (64)                 (30%) 8         
Employability & Skills 2,484           2,512            28                   1%
Regeneration 1,271           1,271            -                     0%
Business 1,064           1,064            -                     0%
Growth & Investment 258              258               -                     0%
Total for Economic Development, Growth and
Investment 5,290           5,254            (36)                 (1%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,737           1,758            21                   1%
Housing Assets & Investment (1)                 (1)                  -                     0%
Property Maintenance 3,602           4,292            690                 19% 9         
Property Running Costs 4,675           4,761            86                   2% 10       
Energy and Sustainability 7,537           7,537            -                     0% 11       
Internal Transport 10,066         10,386          320                 3% 12       
Total for Sustainability, Transport and Corporate
Property 27,616         28,733          1,117              4%
Net Total 58,886         60,390          1,504              3%

Page 16

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 50,717         50,804          87                   0%
Property Costs 23,859         24,632          773                 3%
Supplies and Services 9,717           9,937            220                 2%
Transport and Plant Costs 9,635           10,423          788                 8%
Administration Costs 818              822               4                     0%
Other Agencies & Bodies 21,163         21,115          (48)                 (0%)
Transfer Payments -                   -                    -                     0%
Other Expenditure 182              263               81                   45%
Capital Financing -                   -                    -                    
Gross Expenditure 116,091       117,996        1,905              2%
Income (57,205)        (57,606)         (401)               1%
Net Expenditure 58,886         60,390          1,504              3%

Page 17

Appendix 3a
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since P8 however the service are currently managing significant
financial challenges to achieve a break-even position.
5,345 216 4%
Supplies & Services: An overspend of £0.216m in supplies and services. This is due to an overspend of
£0.061m in relation to the purchase of PDA's to monitor hand vibrations, £0.019m in employee clothing,
£0.038m in tools and implements and £0.097m in materials which relates to the increase in volume and scope
of void and damp works.
579 181 31% Transport costs: An overspend of £0.181m in transport costs. This is due to an overspend of £0.055m in
scaffolding which relates to factoring works, £0.064m in skip hire costs and £0.062m in other transport costs.
2,833 316 11% Third Party Payments: An overspend of £0.316m in third party payments is largely in relation to an increase in
the volume of void and damp work.
(21,515) (759) 4% Income: There is a projected over recovery in income of £0.759m largely in relation to the volume and scope of
void and damp works and other increased costs.
46 Other minor movements
-
Note 2 Planning Services
Movement: There has been a favourable movement of £0.041m since P8 mainly due to a projected increase in
planning fee income.
775 (28) (4%) Employee Costs: Projected underspend of £0.028m due to vacancy management.
(609) (121) 20% Income: Forecasted over recovery of £0.072m due to additional planning fee application income.
(5) Other minor movements
(154)
Note 3 Protective Services
Movement: There has been a favourable movement of £0.017m since P8 which is primarily due to £0.040m of
further employee costs underspends due to vacancy management within the Out of Hours team, partially offset
by projected dangerous buildings costs of £0.017m.
2,494 (97) (4%) Employee Costs: projected underspend of £0.097m due to vacancy management.
(15) Other minor movements
(112)
Note 4 Other Housing
Movement: There has been no overall significant movement from P8.
3,839 (249) (6%)
Employee Costs: projected underspend of £0.249m due to vacancy management.  This underspend includes
vacant posts being held due to the Housing Service review, new employees taking up posts at the bottom of
the pay scale and a number of staff not part of the Local Government Pension Scheme.  £0.046m of the
underspend relates to the Rapid Rehousing Transition Plan (RRTP).
2,395 67 3%
Property Costs: projected overspend due to £0.065m in furnished tenancy grant costs, a review of the charging
structure is to be undertaken; and £0.015m additional costs in property rents.  This is partially offset by a
£0.010m expected underspend in window cleaning costs.
104 97 93% Other Expenditure: there is a projected overspend of £0.061m in arrears write offs and a forecasted additional
bad debt provision of £0.025m.
(5,862) 29 (0%) Income: projected under recovery of £0.015m due to backdated rent adjustment in Temporary Furnished
Accommodation, along with a forecasted reduction in HRA contribution of £0.011m.
16 Other minor movements
(40)

Page 18

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Streetscene
Movement: There has been an adverse movement of £0.032m since period 8, which is mainly in employee
costs.
7,157 (18) (0%) Employee Costs: £0.018m underspend due to vacancy management.
50 Other minor movements.
32
Note 6 Waste Services
Movement: There has been a favourable movement of £0.026m since P8.
5,132 730 14%
Employee Costs: The overspend includes temporary additional resources required to deal with new builds and
to cover a significant, and challenging, sickness absence rate. The statutory nature of the service requires
additional resources to cover unforeseen absences. A robust absence monitoring process is in place and an
overall review of the Waste service in light of legislative changes and current service demands is ongoing. This
will also take account of waste compositional analysis.
572 126 22% Supplies & Services: Forecast overspend on Compactors £0.047m, Tools and Implements £0.042m and Trade
effluent £0.034m.
160 213 133%
Transport Costs: Additional vehicles were temporarily in place earlier in the year to deal with pressures from
new builds and seasonal demands in Garden Waste, however a reduction of 3 vehicles has been implemented
since 1st October 2023. One additional vehicle is still required and 2024/25 budget provision is being reviewed
for this vehicle.
6,418 (69) (1%) Third Party Payments: An underspend of £0.048m is largely in relation to the Clyde Valley contract.
(3,110) (370) 12% Income: Additional income from the renewal of kerbside recyclate contracts of £0.325m and £0.029m from sale
of scrap.
(35) Other minor movements
595
Note 7 Municipalisation Advertising
Movement: There has been an unfavourable movement of £0.062m from P8 due to a further projected under
recovery of advertising income.
(123) 102 (83%)
Income: A projected under recovery of £0.102m primarily due to lead in time delays in vehicle advertising and
unfavourable market conditions. This was a high end/stretched target and the market rates when tendered
were not as favourable as forecast. However, the team continue to robustly progress this initiative with 7
companies now signed up and we are currently in negotiations with a further 10 companies.
102
Note 8 Economic Policy
Movement: There has been a favourable movement of £0.027m from P8 due to an increase in employee costs
underspends.
221 (65) (29%) Employee Costs: A projected underspend of £0.065m due to vacancy management and funding received for
work completed in house.
1 Other minor movements.
(64)
Note 9 Property Maintenance Costs
Movement: There has been adverse movement of £0.394m since P8 largely due to essential re-profiling of
backlog statutory compliance works, and increased contract costs.
6,855 680 10%
Property costs: There is a projected £0.278m overspend related to unforeseen RAAC mitigation works
(£0.178m) and other essential reactive maintenance works. In addition, there is a projected overspend of
£0.459m in Statutory Compliance due to essential re-profiling of backlog electrical compliance work. This has
been offset by a £0.077m underspend in PMB projects due to reprioritisation to mitigate the above overspend
position. 
10 Other minor movements
690
Note 10 Property Running Costs
Movement: There has been favourable movement of £0.029m since P8 due to a rebate of £0.087m in relation
to Community hub charges.  This has been partially offset by a £0.050m under recovery in property rental
income.
6,349 32 1% Property Costs: There is a projected £0.032m overspend due to associated costs for community hubs within
SHUs. Discussions are ongoing between HSCP, Housing and Communities to resolve the matter.
1,784 50 3% Income: There is a projected under recovery in  property rental income.
4 Other minor movements
86

Page 19

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 11 Energy and Sustainability
Movement: There has been a favourable movement of £0.025m since P8 due to decreased projected utility
costs.
7,968 - -
Property Costs: Due to the current energy crisis and after drawing down £2.754m from contingencies and
earmarked funds there is no projected overspend in property costs.
A number of workstreams are ongoing to reduce the above tariff related increases and as part of our overall
sustainability strategy.
-
Note 12 Internal Transport
Movement: There has been a small favourable net movement of £0.002m since P8.
1,796 (115) (6%) Employee Costs: Projected underspend of £0.115m due to vacancy management.
4,441 323 7% Transport Provision Costs: Projected overspend of £0.323m due to an increase in the number of pupils
requiring transport for 2023/24, along with increases in contract costs due to inflation.
1,769 (49) (3%) Fuel: Projected underspend in Fuel of £0.049m due to lower than projected usage
476 128 27%
External Hires: Projected overspend of £0.128m for the additional hire of vehicles. This is a due to a
combination of increased rental costs from suppliers, the prolonged lead delivery times for replacement
vehicles and the increase in downtime of fleet vehicles due to age and the availability of parts.
1,117 160 14% Repairs & Maintenance: Projected overspend of £0.160m in repairs and maintenance as a result of price
increases and maximising the life of assets due to replacement vehicle lead times.
(3,081) (93) 3%
Income: Projected over recovery of £0.093m, mainly due to over recovery of £0.140m in bus transport income
and hire of pool vehicles, which is partially offset by a projected under recovery of £0.050m in the pool car
scheme.
(34) Other minor movements
320

Page 20

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,257 2,234 (23)               (1%)
SPT Concessionary Fares 286 291 5                  2%
Ayrshire Joint Valuation Board 965 932 (33)               (3%)
3,508 3,457 (51)               (1%) 1           
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
7,273 6,196 (1,077)          (15%) 2           
Housing Benefits 2,587 2,487 (100)             -4% 3           
15,613 14,385 (1,228)          (8%)

Page 21

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
There has been no signficant movement since Period 8
3,508 (51)                 -1% Projected underspend of £0.051m due confirmation of annual requisitions and applicable refunds.
(51)
Note 2 Other Corporate Items
There has been a favourable movement of £0.165m since Period 8 primarily due to a revised drawdown of
centrally held inflation provision to support pressures within services.
7,273 (1,077)            -15%
The projected underspend is primarily related to centrally held inflationary cost provisions, which are being
applied to offset pressures reported across other services, and additional income from employee benefit
schemes. The impact of inflation will continue to be monitored throughout the year.
(1,077)
Note 3 Housing Benefit
There has been a £0.010 favourable movement since Period 8
2,587 (100)               -4% Projected underspend of £0.100m due to the provision of Housing Benefits and overpayment recovery.
(100)

Page 22

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 12,947 12,947 - -
Contribution to Loans Fund Reserve 5,699 5,699 - -
Scottish Government Funding (353,004) (353,004) - -
Council Tax (65,382) (65,335) 47 (0%) 1
Use of Earmarked Funds (10,170) (10,170) - -
Net Total (409,910) (409,863) 47 (0%)
There has been a significant increase in the value of CTR claims received to date, £0.496m. This has been offset
by reduced bad debt provision and the utilisaton of centrally held cost of living provisions.
Note 1 Council Tax

Page 23

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,504 5,041 (463) (8%) 1
Property Costs
Responsive Repairs 7,189 6,998 (191) (3%)
Void Repairs 3,577 4,320 743 21%
Planned and Cyclical Maintenance 4,834 5,230 396 8%
Aids and Adaptions 1,667 1,667 - 0%
Other property costs 5,451 5,941 490 9%
Total for Property Costs 22,718 24,156 1,438 6% 2
Supplies & Services 671 691 20 3%
Transport Costs 28 28 - 0%
Administration Costs 1,892 1,918 26 1%
Third Party Payments 3,519 3,343 (176) (5%) 3
Transfer Payments 172 172 - 0%
Other Expenditure 380 380 - 0%
Capital Financing Costs 23,309 16,250 (7,059) (30%) 4
Gross Expenditure 58,193 51,979 (6,214) (11%)
Income
Council House Rents (56,803) (56,383) 420 (1%)
Other Rents (332) (399) (67) 20%
Recharges (828) (1,032) (204) 25%
Other Income (230) (335) (105) 46%
Total Income (58,193) (58,149) 44 (0%) 5
Net Expenditure - (6,170) (6,170)

Page 24

Appendix 6a
HRA
BUDGETARY CONTROL 2023/24
REPORT FOR THE 10 MONTHS TO 31 January 2024
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
5,504 (463) -8%
(463)
Note 2
22,718 1,438 6%
1,438
Note 3
3,519 (176) -5%
(176)
Note 3
23,309 (7,059) -30%
(7,059)
Note 4
(58,193) 44 0%
44
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/23
£m £m £m £m £m £m
4.709 - - 6.170 (2.648) 8.231
1.500 - - - - 1.500
5.000 - - - (1.417) 3.583
0.198 - - - - 0.198
0.123 - - - - 0.123
0.781 - - - - 0.781
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.270 - - - - 0.270
13.685 - - 6.170 (4.065) 15.790
HRA reserves and balances
Capital Financing Costs
There is a projected underspend in capital financing costs of £7.059m due to lower than anticipated loan charges. 
This is due to the profiling within the HRA Capital budget and the continued under borrowed position as the council
utilises internal funds in line with the Treasury Management and Investment Strategy. The underspend will be
reflected in the Business Plan which is currently being reviewed.
Movement: There has been an adverse movement of £0.068m since P8. 
Property Costs
Movement - there has been a favourable movement of £0.154m since Period 8. This is due to a favourable
movement of £0.113m in Responsive Repairs, £0.173m in Planned and Cyclical Maintenance and £0.046m in Aids
& Adaptations. This has been partially offset by an adverse movement of £0.061m in Void Repairs and £0.117m in
other property costs.
A projected overspend of £1.438m in Property Costs. This is due to a projected overspend of £0.743m in Void
Repairs, £0.395m in Planned and Cyclical, including increased costs in relation to timber and damp works.
Maintenance and £0.490m in other property costs. This is partially offset by a projected underspend of £0.190m in
Responsive Repairs.
Income
Movement - There has been a favourable movement of £0.503m since Period 8. This is due to an increase in
Council House Rents of £0.538m and other rents of £0.002m, partially offset by adverse movements of £0.033m in
recharges and £0.004m in other income.
There is a projected under recovery of  income of £0.044m. Rental Income is projected to be under recovered by
£0.420m as a result of protracted and Long term voids. This is partially offset by an over recovery of £0.067m other
rents, £0.204m in recharges and £0.105m in other income.
Third Party Payments
Movement - there has been an adverse movement of £0.004m since Period 8.
A projected underspend of £0.176m in third party payments primarily due to an anticipated reduction in the ASB
contribution.
Section
Employee costs
An underspend in employee costs of £0.463m. This is due to vacancy management.
Movement - there has been a favourable movement of £0.168m since Period 8 due to vacancy management.
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works

Page 25

Appendix 7
1) Budget Virements
Place
Roads - Third Party Payments T 0.060
Roads - Supplies and Services T 0.066
Roads - Employee Costs T -0.038
Roads - Income T -0.088
Employability - Third Party Payments T 0.650
Employability - Employee Costs T -0.425
Employability - Supplies and Services T -0.004
Employability - Income T -0.221
0.000
0.000
Budget Management - 31 January 2024
Virement/Budget Adjustment Requests
2023/24
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m

Page 26

Integration Joint Board
14th March 2024
Subject : 2023-24 – Month 10 Financial Performance
Purpose : To provide an overview of the IJB’s financial performance as at
month 10 (January). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected year-
end overspend of £4.171m;
(b) notes the progress with delivery of agreed savings;
(c) notes the actions which are being taken to progress financial
recovery;
(d) notes the remaining financial risks for 2023-24; and
(e) approves the budget reductions which are detailed at
paragraph 2.10. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
Appendix 8

Page 27

refers to the position at the end of January, further work is undertaken following the
month end to finalise projections, therefore the projected outturn position is as current
and up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £4.171m (1.3%) for 2023-24 which
is an adverse movement of £0.313m from month 7. 
1.3  From the core projections, overall, the main areas of pressure are residential
placements for children, supplementary staff in wards and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 10 
At month 10 against the full-year budget of £312.972m there is a projected year-end
overspend of £4.171m (1.3%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £3.353m (£0.853m adverse) in social care services and
a projected overspend of £0.818m (£0.540m favourable) in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £92.978m there is a projected overspend of £0.690m
(0.7%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£0.547m (£0.049m favourable movement). 
The budgeted number of permanent placements is 780 and at month 10 there are
784 placements.  The projection assumes that the current number of placements
will continue to the end of the year. Within the projection there is an assumption

Page 28

that recent placements which do not have a completed financial assessment
(often due to the pressure to discharge from hospital) are costed with 25% of the
cases at the current average cost of a placement and 75% at the gross or interim
funded rate.  It is likely that there will still be some cases being gross or interim
funded at the year end. Their actual cost will not be known until the financial
assessment is completed and this can impact on the final position. 
The level of income recovered from charging orders is included in the projection
above and is assumed to be £0.599m over recovered (£0.395m favourable)
based on the income received to date.   This income is not easy to project as it
depends on the length of the legal process and time taken to sell the property that
the charging order is registered to. 
b) Interim care beds are projected to underspend by £0.400m (£0.150m favourable)
based on the usage to date and projected usage until the year end. 
c) Care at home (in house and purchased) is projected to be £0.156m overspent
(£0.574m adverse).  The position includes an underspend in in-house services of
£0.362m (£0.557m adverse) as there are vacant posts, but some of the current
capacity is being met by existing staff working additional hours and casual staff. 
Bank staff are being offered contracts and additional staff are being recruited
which will replace the need for existing staff to work additional hours.  The adverse
movement is due to covering high levels of absence during December and
January . This is partly offset by an overspend in purchased services of £0.518m
(£0.018m adverse) as the budget was reduced to reflect the additional costs of
bringing some services in-house after the provider withdrew from the contract.
There is also a projected underspend of £0.093m (£0.093m favourable) in
supplies. 
d) Reablement services are projected to be £0.185m (£0.060m favourable)
underspent due to vacancies. 
e) Care at Home Charging Income is projected to under recover by £0.050m
(£0.010m favourable) due to an ongoing shift towards personal care which is non
chargeable. 
f) Physical Disability Services - projected underspend of £0.269m (£0.019m
favourable) in community care packages, £0.442m underspend (£0.007m
adverse) in direct payments and £0.532m overspend (£0.074m adverse) for
residential placements. There is also an under-recovery of income of £0.126m
(£0.007 favourable).   
g) Anam Cara is projected to overspend by £0.073m (no movement) due to covering
vacancies and sickness absence (£0.017m) and under-recovered income
(£0.056m).

Page 29

h) Integrated Island Services is projected to be £0.308m overspent (£0.041m
adverse movement).  There is an overspend at Montrose House of £0.264m
(adverse movement of £0.022m) which relates to employee costs (the net cost of
agency staff versus vacancies). There is also an overspend of £0.050m due to
Band 6 nurses receiving back-dated recruitment and retention premium this
financial year. Arran medical services are projecting to overspend by £0.032m
and the remaining projected overspend is due to supplies costs increasing. The
overspends are partially offset by a projected underspend in care at home costs
of £0.018m (£0.068m adverse movement). There are staffing vacancies which
are included within the payroll turnover savings figures below which offset the use
of agency and bank staff. 
i) District Nursing is projected to overspend by £0.201m (£0.006m adverse
movement) due to an overspend on bank nursing costs and supplies. 
j) Rehab wards are projected to overspend by £0.140m which is an £0.062m
favourable movement (Redburn ward £0.202m overspent and Douglas Grant
£0.062m underspent).  The overspend is due to cover costs for vacancies as well
as supplementary staffing for patients who require one to one support.   
k) Wards 1 and 2 are projected to overspend by £1.004m (£0.079m adverse
movement) due to increased use of supplementary staffing. 
l) Cumbrae Lodge Continuing Care beds are projected to underspend by £0.260m
(£0.110m favourable) due to a reduced charge to reflect the reduction in beds
used. 
2.4 Mental Health Services 
Against the full-year budget of £102.727m there is a projected overspend of £0.882m
(0.9%) prior to the reallocation of the Lead Partnership overspend to East and South
HSCP.  This also excludes any potential variance on the Mental Health Recovery
and Renewal Funding where any underspend will be earmarked at the year-end for
use in 2024-25. The main variances are: 
a) Learning Disabilities are projected to overspend by £0.859m (£0.189m adverse)
and the main variances are: 
• Care Packages (including residential and direct payments) - projected
underspend of £0.183m in community care packages (£0.026m
favourable), projected overspend of £0.310m in direct payments (£0.074m
favourable) and £0.451m for residential placements (£0.005m adverse).
The LD community packages are being reviewed based on the quarter 3
actual costs to date.  This could lead to a variation between the current
projection and the actual outturn

Page 30

• Void costs for Supported Accommodation are projected to overspend by
£0.124m. This will reduce into 2024-25 as the developments are now
operational. 
• Trindlemoss non-employee costs are projected to overspend by £0.088m. 
This is due to increased energy charges. 
b) Community Mental Health services are projected to underspend by £0.437m
(£0.192m favourable movement) which is mainly due to an underspend of
£0.443m in community packages (including direct payments) and an overspend
in residential placements of £0.275m.  The MH community packages are being
reviewed based on the quarter 3 actual costs to date.  This could lead to a
variation between the current projection and the actual outturn. 
c) The Lead Partnership for Mental Health is projecting to be £0.456m overspent
(£0.732m favourable movement) and the main variances are as follows: 
• A projected overspend in Adult Inpatients of £0.530m (£0.010m adverse
movement) due to overspends in supplementary staff for enhanced
observations, staff cover due to sickness (inc. covid outbreak) and reduced
bed sale income.  
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.168m (£0.242m favourable movement) based on current number of
placements and enhanced costs remaining until the year end. The favourable
movement is due to one placement moving from an external provider to on-
house care at Woodland View.  These placements are for individuals with very
specific needs that require a higher level of security and/or care from a staff
group with a particular skill set/competence.  There are no local NHS secure
facilities for women, people with a learning disability or people with
neurodevelopmental disorder. This can necessitate an UNPACs placement
with a specialist provider which can be out-of-area.  The nature of mental
health UNPACs spend is that it is almost exclusively on medium or long term
complex secure residential placements which are very expensive so a small
increase in placements can have a high budgetary impact. Due to the
complexity and risk involved, transitions between units or levels of security
can take many months. Applications to approve a placement are made to the
Associate Medical Director for Mental Health who needs to be satisfied that
the placement is appropriate and unavoidable prior to this being agreed. 
• A projected overspend in MH Pharmacy of £0.086m (£0.002m adverse) due
to an increase in substitute prescribing costs. 
• Learning Disability Services are projected to underspend by £0.311m
(£0.633m favourable movement).  There is a high usage of supplementary
staffing due to backfill for sickness, increased and sustained enhanced
observations and vacancies.  The enhanced observations are reviewed on a
daily basis. The favourable movement is due to additional recharge income
for two out of authority placements.

Page 31

• Elderly Inpatients are projected to overspend by £0.169m (£0.004m
favourable) due to the use of supplementary staffing.  
• The Innovation Fund is projected to underspend by £0.234m (£0.002m
adverse) due to slippage within some of the projects and not all of the funding
was allocated.
• Addictions in patients are projected to overspend by £0.003m (no movement)
due to the use of supplementary staffing.
• The Directorate cost centre is projected to overspend by £0.095m (no
movement) mainly due and overspend of £0.049m on supplies and £0.012m
of legal fees.
• Action 15 – is reported as on-line as any underspend will be carried forward
and earmarked for use in 2024-25.  The current projected underspend is
£0.278m but this is not included in the overall projected outturn.
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.115m (£0.139m adverse) in
2023-24, further information is included in the table below: 
The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• Adult Community MH £0.029m
• CAMHS £0.592m
• Mental Health Admin £0.354m
• Psychiatry £0.267m
• Psychology £0.683m
• Associate Nurse Director £0.063m 
Vacancy Savings Target (£0.873m)
Projected to March 2024 £1.988m
Over/(Under) Achievement £1.115m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £40.313m there is a projected overspend of £5.325m
(13.2%) (£0.056m adverse) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£4.863m (£0.065m favourable). The main areas within this are noted below:

Page 32

• Children’s residential placements are projected to overspend by £5.445m
(£0.040m favourable). We started 2023/24 with 32 external placements and
there are currently 37 placements (month 7 was 35 placements) which are
assumed to continue until the end of the year.  Within the £5.445m there is
£0.232m relating to enhanced costs for four placements.  One placement has
also moved from being 100% funded with HSCP to 50/50 (from Jan 24). There
are a number of factors leading to this challenging position: 
• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100%+ occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking
Children (UASC) under the National Transfer Scheme and to support
trafficked young people who have been identified in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases
is shared 50/50 with Education services. 
Children’s Services are continuing to work with other services including
Education and Housing to address the challenges. A change programme is
being developed to respond to the pressures of residential care, this forms
part of the Transformation Plan which seeks IJB approval elsewhere on the
agenda for this meeting. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.623m underspent (£0.094m favourable); this is based on
the current number of placements and reflects additional monies received to
support the uplift in rates for fostering and kinship placements (16+year olds)
and the costs associated with this. 
• Children with disabilities – residential placements are projected to overspend
by £0.272m (£0.033m favourable). This is based on 10 current placements. 
Direct payments are projected to underspend by £0.219m (£0.021m
adverse).  Community packages are projected to underspend by £0.124m
(£0.005m favourable) based on 62 current number of packages and one
further package until the year end. 
• Residential respite – placements are projected to overspend by £0.054m
(£0.005m adverse movement).    These short-term placements are used to
prevent an admission to full residential care.  There is one short term
placement, but this could vary throughout the year and have an impact on the
projection.

Page 33

b) Head of Service – is projected to overspend by £0.336m (£0.030m adverse).  The
overspend is mainly due to the planned saving of £0.233m in relation to the staff
reconfiguration in the children’s houses which will not be achieved in 23-24. 
There are also projected costs of £0.092m for the JII (Joint Investigative Interview)
project which is not funded. 
c) Justice Services – is projected as being spent in full. There was no additional
grant funding to mitigate the impact of the 23/24 pay award but this is being
funded non-recurringly in 23-24 by savings from vacant posts. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have been taken as payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.514m (£0.049m favourable) mainly due to a
projected underspend in the Carers Strategy funding. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.745m
(£0.042m favourable) and the main areas of underspend are: 
• There is projected slippage on the LD and MH transition funding of £0.954m
(£0.260m favourable) due to delays in children transitioning into adult
services.
• The agreed local government pay award was not fully funded.  The total cost
of the pay award was £4.826m against the budgeted increase of £1.982m.
The additional cost of £2.844m will be partially met by additional recurring
Scottish Government funding of £2.577m and the gap of £0.267m is an in-
year overspend. Additional funding is expected to be included in the 24/25
budget which will cover the remaining gap.
• An over-recovery of payroll turnover of £0.655m (£0.068m adverse) for social
care services and an over-recovery of payroll turnover of £0.546m (£0.240m
favourable) for health services as outlined in the table below.   
The turnover targets and projected achievement for the financial year for Health and
Social Care services outwith the Lead Partnership is noted below:

Page 34

The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £3.069m (102% of annual target) has been
achieved to date.   
Social Care Health
Services
Vacancy Savings Target (3.014m) (1.433m)
Projected to March 2024 3.669m 1.979m
Over/(Under) Achievement 0.655m 0.546m 
The health vacancy projection to the year-end is based on the month 9 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
The main service areas are: 
• Children and Families £0.838m
• Learning Disability £0.096m
• Management and Support   £0.399m
• Community Care Service Delivery £0.260m
• Rehab and Reablement £0.234m
• Locality Services £0.288m
• Integrated Island Services £0.312m
• Community Mental Health £0.049m 
There have been no intentional plans to pause or delay recruitment and services
have actively continued to recruit; in some service areas it has proven difficult to fill
posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2023-24 budget included £4.963m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 10
£m
Red - 0.273
Amber 2.245 0.322
Green 2.718 0.560
Blue - 3.808
TOTAL 4.963 4.963

Page 35

b) The main area to note is that previous amber savings of £0.273m, relating to
the reconfiguration of staffing within Children and Families, have been
escalated to red.  Progress to date suggests that the timescale for this saving
will not be met and the full £0.273m will not be achieved in 2023-24 but this is
accounted for in the projected outturn.   
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” 
Appendix C highlights the movement in the budget position following the initial
approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount
1 Training Grade Adjustment – November  (21,000) 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB outturn position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis; this position is currently the default pending
further work to develop a framework to report the financial position and risk sharing
across the 3 Partnerships in relation to hosted or lead service arrangements, which
has been delayed by the requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
require to be shared with North. At Month 10 the MH lead partnership is projected to
overspend by £0.456m (£0.149m NRAC share for East and £0.130m for South). 
South HSCP (month 9 information) – projected overspend of £0.564m (£0.204m
adverse) of which £0.209m will be allocated to North. The overspend is mainly due
to an overspend of £0.432m in the community store to replace obsolete equipment,
which will reduce maintenance costs in the medium term and mattress replacement,

Page 36

£0.171m in the continence service and an underspend £0.039m in the Family Nurse
Partnership.   
East HSCP (month 9 information) – projected underspend of £0.143m (£0.006m
favourable) of which £0.053m will be allocated to North. The underspend is mainly
due to: 
Primary Care and Out of Hours Services (Lead Partnership) 
There is a projected overspend of £0.118m on the Primary Care Lead Partnership
budget and includes a projected underspend in Dental services totalling £0.309m,
where staffing numbers are running at less than establishment. Recruitment over the
remainder of the financial year has the potential to impact further on the projected
outturn position at month 9. In addition, there are projected reduced costs within
Primary Care contracting and support £0.127m, largely due to staff turnover. These
reduced costs are partially offset by additional Primary Medical Services costs
£0.425m, as well as additional costs in Out of Hours services £0.129m, with work
ongoing to mitigate increased costs as far as possible over the course of the 2023/24
financial year and going forward into 2024/25. The projected outturn position
assumes funding will be allocated to fully offset Urgent Care Pathway projected costs
£1.170m, as well as Covid-19 Therapeutics projected costs £0.226m 
Prison and Police Healthcare (Lead Partnership) 
The £0.118m projected overspend at month 9 is largely due to increased costs
associated with the new national medical contract. 
Allied Health Professions (Lead Partnership)
Work has been undertaken to analyse Allied Health Professions services which are
hosted by East Ayrshire IJB on a Lead Partnership basis. There is a projected
underspend of £0.369m for the current year which mainly relates to staffing savings
in Physiotherapy / MSK and Podiatry services and is partially offset by increased
Orthotics costs. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources. 
The assumed North budget for set aside resources for 2023-24 was
£35.547m.  This was based on the 2022-23 figure of £34.850m inflated by the 2023-
24 uplift of 2%. Ayrshire Finance Leads have now agreed a baseline methodology
for set aside budgets which involves using the four full years prior to the pandemic,
2016/17 – 2019/20 inclusive. This was included in a Q3 update for Ayrshire Finance
Leads on 23/01/24. This changes the set aside budget to £35.453m, being the
baseline activity at 2023/24 prices.

Page 37

The annual budget for Acute Services is £424.8m.  The directorate is overspent by
£25.5m after 10 months and are forecast to be £30.5m over by year end. This is
caused by increasing overspends on agency medical and nursing staff, together
with drug expenditure. These have been required due to the level of operational
pressure being experienced, in common with many other areas in Scotland. Around
180 additional beds were open across both main hospital sites during January. 
There is a material underlying deficit caused by: 
• Unachieved efficiency savings
• Length of Stay (LoS) in NHS Ayrshire and Arran acute hospitals is above the
Scottish average 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
2.12 FINANCIAL RECOVERY PLAN 
The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with
the available resource. 
Heads of Service have closely reviewed expenditure and have implemented actions
which have reduced some areas of overspend as outlined in the table below.  The
projected year-end position has improved by a net £0.405m since Month 3. 
Favourable
Movement
since Month 3
Payroll Turnover – Health (non-Lead) 285,000
Anam Cara staffing 104,000
Care Experienced Young People  324,000
Looked After Children 262,000
Transitions funding 574,000
Care Homes 216,000
Physical Disabilities (Community Packages, Direct
Payments and Residential) 
346,000
Interim Care Beds 400,000
Mental Health Care Packages 82,000
Mental Health Lead Partnership – North element  368,000
Children with a disability  177,000
Carers Funding 135,000
District Nursing 24,000
Rehab Wards 124,000

Page 38

These areas of improvement have been partially offset by adverse movements in
Care at Home, Integrated Island Services, Wards 1 and 2 at Woodland View,
UNPACS and intervention services. 
Work is ongoing to further improve the projected position and minimise the
overspends continuing into 2024-25. This work is built on the following general
principles:
• No adverse impact on delayed discharges or patient flow during Winter
• Exercising professional judgement around the use of waiting lists where this
may have an impact elsewhere in the system
• Reviewing the need for more active management of non-frontline vacant posts
• The non-recurring use of reserves
• Working with East and South on lead partnership projections 
As a contingency there is provision of £2m non-recurring funding set aside in the
reserves (appendix D) to contribute towards the 2023-24 position.   This would
reduce the current projected overspend to £2.171m. 
The IJB also holds a General Fund reserve balance of £5.821m of unallocated funds,
this would underwrite the risk of the remainder of the projected overspend.  This is
not a sustainable position as this funding is non-recurring and it does not resolve the
areas underlying the projected overspend. 
2.13 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2023-24
budget during the year, these include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The use of supplementary staffing for enhanced observations across a
number of service areas.
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges.
• Continuing risks associated with provider sustainability.

Page 39

• The NHS Ayrshire and Arran Health Board financial deficit and the risks
around further escalation in the national framework for financial escalation. 
North Ayrshire IJB have already discussed our position in relation to the
request for payment for delayed discharges. 
These risks will continue to be monitored during the remainder of 2023-24. 
2.14 RESERVES 
The IJB reserves position is summarised in the table below. 
The opening ‘free’ general fund balance of £5.821m is held as a contingency balance;
this equates to around 2.1% of the initial approved IJB budget for 2023-24 which is
within, but towards the lower end, of the target range of 2%-4%. The table has been
updated to reflect the estimated draws during 2023-24. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Opening Balance - 1 April 2023 6.448  6.997 4.219 17.664
Audit Adjustment (0.627)  (0.309) - (0.936)
Corrected Opening Balance 5.821  6.688 4.219 16.728
2023-24 Draw Per the Budget
Paper -  (1.252) - (1.252)
Current Reserve balances 5.821  5.436 4.219 15.476
Estimated 2023-24 Draws (2.171)  (3.159) (2.365) (7.695)
Projected Balance – 31 March
2024 3.650  2.277 1.854 7.781 
The 2023-24 budget approved the use of £1.252m of previously earmarked reserves
to support a balanced budget position for 2023-24. The HSCP earmarked reserves
also includes a further amount of £2.000m which was agreed to support the financial
position during 2023-24. 
The reserves above now reflect the adjustment of £0.936m which was identified in
the external audit of the 2022/23 accounts and reported to the November IJB. This
related to a difference between the total IJB reserves and the balances due to the
IJB from partners’ audited accounts and has now been reconciled. 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2023-24 from
within the available resource, thereby limiting the financial risk to the funding
partners.

Page 40

3.3 Measuring Impact 
The final outturn for 2023-24 will be reported to the IJB in June 2024. 
4. IMPLICATIONS 
4.1 Financial
The financial implications are as outlined in the report.   Against the full-year budget
of £312.972m there is a projected overspend of £4.171m. The report outlines the
main variances for individual services.   
4.2 Human Resources
The report highlights vacancy or turnover savings achieved to date. Services will
review any staffing establishment plans and recruitment in line with normal practice
when implementing service change and reviews as per agreement with the IJB, there
is no intention to sustain the staffing capacity reduction on a recurring or planned
basis. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.13 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
None. 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB.

Page 41

Caroline Cameron, Director 
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]

Page 42

PUBLIC INFORMATION
2023-24 Budget Monitoring Report–Objective Summary as at 31st January 2024       Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 73,444 72,846 (598) 19,534 20,822 1,288 92,978 93,668 690 132 558
: Locality Services 28,920 27,990 (930) 5,356 5,636 280 34,276 33,626 (650) (652) 2
: Community Care Service Delivery 38,711 38,690 (21) 0 0 0 38,711 38,690 (21) (612) 591
: Rehabilitation and Reablement 2,162 2,167 5 0 0 0 2,162 2,167 5 5 0
: Long Term Conditions 1,000 1,062 62 10,463 11,352 889 11,463 12,414 951 1,090 (139)
: Community Link Workers 191 187 (4) 0 0 0 191 187 (4) (7) 3
: Integrated Island Services 2,460 2,750 290 3,715 3,834 119 6,175 6,584 409 308 101
MENTAL HEALTH SERVICES 30,170 30,596 426 72,557 73,013 456 102,727 103,609 882 1,618 (736)
: Learning Disabilities 23,125 23,984 859 471 471 0 23,596 24,455 859 670 189
: Community Mental Health 6,055 5,618 (437) 1,743 1,743 0 7,798 7,361 (437) (245) (192)
: Addictions 990 994 4 1,868 1,868 0 2,858 2,862 4 5 (1)
: Lead Partnership Mental Health NHS Area Wide 0 0 0 68,475 68,931 456 68,475 68,931 456 1,188 (732)
CHILDREN & JUSTICE SERVICES 35,431 40,653 5,222 4,882 4,985 103 40,313 45,638 5,325 5,269 56
: Irvine, Kilwinning and Three Towns 3,339 3,352 13 0 0 0 3,339 3,352 13 (31) 44
: Garnock Valley, North Coast and Arran 3,126 3,137 11 0 0 0 3,126 3,137 11 (65) 76
:Intervention Services 1,908 1,908 0 8 8 0 1,916 1,916 0 (21) 21
: Care Experienced Children & Young people 23,326 28,189 4,863 0 0 0 23,326 28,189 4,863 4,928 (65)
: Head of Service - Children & Families 1,098 1,434 336 0 0 0 1,098 1,434 336 306 30
: Justice Services 2,413 2,413 0 0 0 0 2,413 2,413 0 (1) 1
: Universal Early Years 221 220 (1) 4,211 4,314 103 4,432 4,534 102 153 (51)
: Lead Partnership NHS Children's Services 0 0 0 663 663 0 663 663 0 0 0
CHIEF SOCIAL WORK OFFICER 1,858 1,349 (509) 0 0 0 1,858 1,349 (509) (465) (44)
PRIMARY CARE 0 0 0 52,998 52,932 (66) 52,998 52,932 (66) (66) 0
ALLIED HEALTH PROFESSIONALS 0 10,014 10,014 0 10,014 10,014 0 0 0
COVID NHS 0 0 0 0 (275) (275) 0 (275) (275) (274) (1)
MANAGEMENT AND SUPPORT COSTS 6,898 5,718 (1,180) 3,716 3,151 (565) 10,614 8,869 (1,745) (1,703) (42)
NATIONAL COMMISSIONED SERVICE 0 0 0 3 3 0 3 3 0 0 0
FINANCIAL INCLUSION 1,467 1,459 (8) 0 0 0 1,467 1,459 (8) (2) (6)
OUTTURN ON A MANAGED BASIS 149,268 152,621 3,353 163,704 164,645 941 312,972 317,266 4,294 4,509 (215)
Return Hosted Over/Underspends East 0 0 0 0 0 (149) 0 0 (149) (389) 240
Return Hosted Over/Underspends South 0 0 0 0 0 (130) 0 0 (130) (340) 210
Receive Hosted Over/Underspends South 0 0 0 0 0 209 0 0 209 133 76
Receive Hosted Over/Underspends East 0 0 0 0 0 (53) 0 0 (53) (55) 2
OUTTURN ON AN IJB BASIS 149,268 152,621 3,353 163,704 164,645 818 312,972 317,266 4,171 3,858 313
Over/
(Under)
Spend
Variance
at Period
7
Movement
in projected 
variance
from Period
7
TOTAL
Partnership Budget - Objective Summary
Council Health
2023/24 Budget

Page 43

PUBLIC INFORMATION 
2023-24 Savings Tracker            Appendix B 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 10
2023/24
Saving
Description of the Saving
1 Staffing reconfiguration - children &
families
Amber Red 273,000     Review staffing provision within children’s houses with the saving
phased over 2023/24 and 2024/25 – 50/50
2 Deliver the Strategic Plan objectives for
Older People's Residential Services -
Reduction in Care Home Places
Amber Blue 1,000,000  The budget for 23/24 would fund an average 780 places at the
current split of nursing/residential (60/40).  This reflects reduced
demand and investment in CAH to support more people at home.
3 Care Home Respite Amber Green 560,000     All respite care to be provided in-house at Anam Cara and
Montrose House and any use of other respite provision funded via
Carers budget.
4 Montrose House Capacity Green Amber 210,000     Registration amended from 30 beds to 20 beds across 2 staffed
wings.  This is supported by introduction of intermediate care beds
at Arran War Memorial Hospital.
5 Reconfigure respite provision at Anam
Cara
Amber Amber 112,000     The service is currently relocated to Taigh Mor (8 beds) on a
temporary basis and this proposal would reduce capacity from 14
beds to 9 beds in one wing when it reverts to Anam Cara.
6 Trindlemoss pool running costs Green Blue 85,000       Trindlemoss Pool has never opened due to ongoing maintenance
issues.  The historic budgeted running costs are £0.085m but it is
expected actual costs would be much higher.  The pool will not
open and alternative therapies will be provided e.g. bounce
therapy.7 Trindlemoss Day Care Green Blue 168,932     Trindlemoss day opportunities staffing was restructured during
2021/22 and 2022/23.  This saving has already been achieved and
will remove the additional staffing budget.
8 Intermediate Placement Scheme -
cessation of service
Green Blue 30,000       The contract has ceased and will not be renewed.
9 Carers Act Funding - Substitution of
Spend
Green Blue 500,000     There is a plan in place to invest across carer service contract,
preparation of carer plans, short breaks and other support to
carers.  This proposal will invest £0.500m in contributions to Red
Rose House, Roslin House, Anam Cara, waiving of charges and
day services.
North Ayrshire Health and Social Care Partnership
2023/24 Savings
Children, Families & Criminal Justice
Community Care & Health
Mental Health
Other Areas

Page 44

PUBLIC INFORMATION 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 10
2023/24
Saving
Description of the Saving
10 Payroll Turnover - increase to target (social
care)
Green Blue 1,000,000  The saving is based on less than 50% of the 2022/23
overachievement
11 Income Generation - 5% Increase to fees and
charges
Green Blue 46,600       Implement a 5% increase to fees and charges and a 5% increase to
the maximum charge.  The impact will be limited where service
users are already paying the maximum charge.
12 Staffing Reconfiguration - Finance and
Transformation
Green Blue 35,091       Saving released through management and admin structure change
TOTAL SOCIAL CARE SAVINGS 4,020,623 
Health:
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 10
Approved
Saving                  
2023/24          
£m
Description of the Saving
13 Payroll Turnover - Health Lead
Partnership
Green Blue 392,245     The saving is based on less than 25% of the 2022/23
overachievement
14 Payroll Turnover - Health Non Lead
Partnership
Green Blue 250,000     The saving is based on less than 50% of the 2022/23
overachievement
15 Reprovisioning of Continuing Care beds Amber Blue 300,000     Currently provided through Cumbrae Lodge Care Home in Irvine
but the provider does not want to continue to provide the service. 
Plans are being developed to relocate the service to Taigh Mor in
Beith with an anticipated saving of £0.3m.
TOTAL HEALTH SAVINGS 942,245    
4,962,868  TOTAL NORTH HSCP SAVINGS
Other Areas

Page 45

PUBLIC INFORMATION
2023-24 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     121.408
Less Living Wage Fund not yet allocated      (2.826)
Revised Budget     118.582
Resource Transfer 1-6 P 24.640
HSCP Fin Circ 3 1-3 P 0.013
Living Wage - final allocation  1-3 P 2.808
ICT Licences Various 1-3 P (0.012)
Island Funds  1-3 T 0.015
Facilities Management Costs - Montrose House 1-3 P 0.387
West Road - Capital funded from Revenue  1-3 T (0.300)
Care at Home – Draw from reserves 4 T 0.173
Transport (taxi) budget transferred to HSCP 6 P 0.247
Curator fees budget transferred from Legal Services 6 P 0.004
Fostering and Kinship – additional SG funding re
increased rates.
6 P 0.486
Commercial Waste  7 P 0.005
Pay Award Funding 8 P 1.603
Interim Care  8 T 0.610
ICT Licences 8 P 0.002
Roundings 9  0.005
Social Care Budget Reported at Month 10 149.268
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Baseline Budget     164.500
Month 10-12 Adjustments     2.473
MDT funding     0.828
Adjust for full year impact of part year amounts     0.052
Revised Baseline   P 167.853
Baseline Funding Increase   P 2.164
Adjust for recurring funding   P 7.629
Adjust for non-recurring   T  2.434
Resource Transfer   P (24.640)

Page 46

PUBLIC INFORMATION
2023/24 Opening Position     155.440
Net impact of Pan Ayrshire Pressures 1 P 0.028
Top Slicing Posts 2022-23 2  P (0.054)
MDT Funds to Arran Medical Group 3 T (0.033)
Training Grade Adjustments 3 P  (0.035)
Ward 3 Band 2 Domestic 3  P (0.004)
V2 B6 to AHM233 3  P (0.061)
Virement 12 Band 2 Domestic 4  P (0.010)
Virement 18 Band 3 budget transfer - J Baird 4  P 0.019
Lymphoedema Top Slice RX 4  P (0.029)
HD Ref 51 Band 2-4 4  P 0.054
District Nursing Anticipated 5 P 0.032
HD REF 110 Multi-Disciplinary Teams 5 P 0.120
Post (EB) transferred to Medical Records 5 T (0.037)
Integrated Infant Feeding (South) 5 P 0.057
Integrated Infant Feeding (SG) 5 T 0.050
2023-24 RX Budget 6 P (0.908)
Training Grade ADJ - August 6 P 0.270
PFG LOCAL IMPROVEMENT 6 P 0.457
ADP National Mission 6 T 0.207
ADP Residential Rehab 6 T 0.094
ADP AFC Pay Uplift 6 T 0.091
ADP Lived & Living Experience 6 T 0.009
ADP Drug Prevalence 6 T 0.059
ADP Whole Family Approach 6 T 0.066
ADP MAT 70% 6 T 0.175
HD126: MENTAL HEALTH AFTER COVID
HOSPITALISATION SERVICE 23-24 6 T 0.039
REMOVE Anticipate MACH (Mental Health After Covid) 6 T (0.102)
HD185: MENTAL HEALTH OUTCOMES FRAMEWORK 6 P 2.178
HD227: DELIVERY OF VETERAN SPECIFIC MENTAL
HEALTH SUPPORT 6 T 0.105
HD229: DIGITAL THERAPY POSTS 6 P 0.059
COMMUNITY PHLEBOTOMY - NORTH SHARE 6 P (0.039)
SOUTH ADP WARD 5 W/VIEW PAY UPLIFT 6 T 0.003
SOUTH ADP ORT PAY UPLIFT 6 T 0.005
SOUTH ADP PREV&SERVICES SUPPORT PAY
UPLIFT 6 T 0.004
Apprenticeship Levy 6 P 0.225
Training Grade ADJ - September 6 P (0.007)
ADP PSST Support - South 6 T 0.008
South Naloxone kits 6 T 0.002

Page 47

PUBLIC INFORMATION
South MAT Funding - Psychiatry 6 T 0.029
ADP Pay Uplift 6 T 0.003
Drug Tarif Anticipate 2023-24 6 P 0.525
North HSCP Medical Pay Award 23/24 6 P 0.532
LDS Shortfall - Alloway Place 7 P (0.008)
TEC (North) to CSS 7 P (0.075)
Budget adj for Buvidal use NADARS 7 T (0.002)
MH Strategy Action 15 Workforce 23-24 7 P 0.879
CAMHS IMP - IPCU 7 P 0.243
CAMHS IMP - INT HOME TREATMENT TEAMS 7 P 0.221
CAMHS IMP - OOH UNSCHEDULED CARE 7 P 0.148
CAMHS IMP - LD FORENSIC AND SECURE 7 P 0.089
HD305: SPECIALIST COM PERINATAL MH, INFANT
MH & NEONATAL PSYCHOLOGY INTERVENTION 7 T 0.373
ANTICIPATE TRANCHE 2: SPECIALIST COM
PERINATAL MH, INFANT MH & NEONATAL
PSYCHOLOGY INTERVENTION 7
T 0.215
DE-ESCALATION ROOMS TO RESOURCE 7 T (0.025)
Hd254 Pharmacy tariff reduction to reflect historic
NRAC share. 7 P (0.015)
Hd256 Increase to the pharmacy tariff to match the
actuals on the national allocation letter. 7 P 0.018
Blood Borne Virus Outcomes Framework 8 T 0.277 
Injection Equipment Provision (IEP) 8 T 0.014 
Funding for an Assistant Nursing Practitioner from the
Maternal & Infant Nutrition bundle 8
T 0.020 
Training Grade Adj - November 8 P (0.021)
HD383: Post Diagnostic Support - Dementia 23/24 9 T 0.094
Roundings 9 T 0.004
Anticipated budgets included in the report but not in the
ledger 10 T and P 1.629
Health Budget Reported at Month 10 163.704
TOTAL COMBINED BUDGET      312.972