Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No: 23/00185/PP
Planning Hierarchy: Local Development 
Applicant: Torloisk Estate
Proposal: Conversion and extension of stone barn to form dwellinghouse,
installation of septic tank and formation of vehicular access
Site Address:  Land West Of Lagganulva Farm, Ulva Ferry, Isle of Mull
____________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 1 
(A)  INTRODUCTION 
This application is to be presented to the Planning, Protective Services and Licensing
(PPSL) Committee on 22 May 2024. 
The purpose of this Supplementary Report is to bring Member’s attention to late
representations received regarding the proposed development which is addressed in
Section B below.  
______________________________________________________________________ 
(B) REPRESENTATIONS     
A late representation has been received from Cllr Willie Hume, local member for Oban
South and the Isles (received 21st May 2024) raising the following issues: 
“I have been contacted by one of my constitutions, all be it very late in the day regarding
Planning Application 23/00185/PP. 
A few points I would like to highlight before tomorrows meeting. 
1 The application states that the house will connect to a public water supply, there is no
public water supply in that area.
2 The electricity supply is on the opposite side of the road, the application does not state
if the supply will be overhead or underground. If it is poles and overhead wires this will
impact the surrounding landscape.
3 The proposed development is contrary to polices LDP Strat 1 and LPD 9 of the local
development plan, I would strongly recommend a SITE VIST before any decision is made.” 
Comment: It is noted that the application is to be served by a private water supply, this
matter is detailed in the main report of handling. It is noted that the provision of a
connection to the electricity network is not a matter that requires express planning
permission. The reference to LDP STRAT 1 and LDP 9 is unclear and it is assumed is
made with reference to the now superseded Argyll and Bute Local Development Plan
2015. It is noted that there is no obvious conflict in respect of the intentions of LDP STRAT
1 which promotes the concept of sustainable development which is now looked at more
extensively under the provisions of LDP2; it is also noted that the provisions of LDP 9

Page 2

related to development setting, layout and design – again matters which are all reflected
in detail within the updated context of LDP2 and against which officers have set out their
assessment of the proposal and a recommendation that the current application is in
accordance with these requirements. It is noted that officers have undertaken a site visit
in their own assessment of the proposal and will include site photographs in their
presentation to PPSL; it would be up to members to determine if a further site appraisal
would add value to their own consideration of this matter. 
A further late issue has been conveyed as a verbal representation (further to her original
written representation) from Kirsty Leitch to the Planning Authority, advising that the
replacement agricultural building, as detailed within application reference
24/00259/PNAGRI, would not be suitable for the agricultural activities associated with the
farm. 
Comment: The comments regarding the replacement agricultural building are noted. It is
proposed to amend Condition 15 – Phasing of Development, relative to the application to
allow for increased flexibility for an alternative scheme for the provision of the replacement
barn. 
A late representation has been received, by email only, from Helen Mackay, dated
21.05.2024. The representation is summarised as: 
The replacement agricultural building is unsuitable, in practical terms, for the required
agricultural purposes. The field forming part of the application site for the new house is
part of the farm’s in-bye land and is classified as improved grassland. The field is used for
holding hoggs on their return from away-wintering and at this time all other in-bye land is
used to capacity. If allocating another field for these purposes, flock size would have to be
reduced, losing support payments and productivity. This would be contrary to LDP2 Policy
83 where this would result in this loss of agricultural land where it weakens the viability of
the agricultural unit. Housing hoggs elsewhere would be costly and an additional building
would have visual impacts. 
Comment: The development proposed by the current application seeks to develop an
existing barn and a rough area of adjacent ground. In terms of the land capability for
agriculture, the application site falls within Class 5.2 where the land is capable of use as
improved grassland, where pasture establishment may be difficult to maintain. NPF 4
Policy 5, sets out ‘Prime Agricultural Land’ as being Class 1, 2 or 3.1 in the land capability
classification for agriculture. The proposed development would be of a location that it
would not impact upon prime agricultural land, and its limited scale is such that it would
not impact significantly upon land of lesser quality that is culturally or locally important for
primary use, with due consideration to the extent of the wider agricultural landholding. 
The full list of conditions, to include the amendment to Condition 15, is appended to this
report. 
____________________________________________________________________________ 
(C) RECOMMENDATION   
That Members note the content of this report which does not introduce any new
information that has not already been addressed in the original Report of Handling. 
The recommendation of the Planning Authority remains that planning permission be
granted subject to the conditions and reasons appended to Supplementary Report No. 1. 
______________________________________________________________________ 
Author of Report: Emma Shaw   Date: 21.05.2024

Page 3

Reviewing Officer: Peter Bain                   Date: 21.05.2024  
Fergus Murray 
Head of Development and Economic Growth

Page 4

APPENDIX A – CONDITIONS AND REASONS RELATIVE TO APPLICATION NO.
23/00185/PP, TO INCLUDE AN AMENDMENT TO CONDITION 15, PHASING OF
DEVELOPMENT. 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00185/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 01.02.2023, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Existing Drawings
1 (downtakings in
red)
PL_003  02.02.2023
Existing Drawings
2 (downtakings in
red)
PL_004  02.02.2023
Proposed
Elevations
PL_008  02.02.2023
Proposed Plan PL_006  02.02.2023
Proposed Section
A-A South
Elevation and
Section B-B
PL_007  02.02.2023
Proposed Renders PL_009  02.02.2023
Proposed Interior
Renders 
PL_010  02.02.2023
Existing Site Plan PL_002  27.02.2023
Proposed Site Plan PL_005  27.02.2023
Proposed Plan PL_006  27.02.2023
Location Plan PL_001  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
3. Sustainable Drainage System

Page 5

Notwithstanding the effect of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition. The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant: 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small
Scale Development – www.sepa.org.uk .  
4. Landscaping and Biodiversity Enhancement 
No development shall commence until a scheme of biodiversity protection and
enhancement, boundary treatment, surface treatment and landscaping has been
submitted to and approved by the Planning Authority. The scheme shall include details
of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding
areas; 
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels; 
iv) Proposed hard and soft landscape works; and 
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how
these benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.

Page 6

Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity.  
5. Junction with Public Road 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD08/004a and shall
include visibility splays of 2.4 metres to point X by 75 metres to point Y from the centre
line of the proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall disrupt
visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be
obtained from the Council’s Roads Engineers prior to the formation/alteration
of a junction with the public road. 
• The access shall be constructed and drained to ensure that no surface water
is discharged onto the public road.  
6. Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. 
Reason: In the interest of road safety.  
7.  Private Water Supply 
No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational.

Page 7

Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
Note to Applicant: 
• Regulatory requirements for private water supplies should be discussed with
the Council’s Environmental Health Officers in the first instance.  
8. Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
written details of the type and colour of materials to be used in the construction of the
roof coverings and external walls have been submitted to and approved in writing by
the Planning Authority. The development shall thereafter be completed using the
approved materials or such alternatives as may be agreed in writing with the Planning
Authority. 
Reason: In order to integrate the development into its surroundings.  
9. PP - Removal of PD Rights – Dwellinghouse 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 1A, 1B, 1D, 2B, 3A,
3B, 3C, 3D and 3E of the aforementioned Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to
its roof. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse.

Page 8

Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse. 
No such development shall be carried out at any time within this Part and these
Classes without the express grant of planning permission. 
Reason: To maintain the integrity and architectural value of this bespoke
dwellinghouse and to protect it and its immediate setting against inharmonious
additions and accretions and to protect the sensitive area and the setting of the
proposed dwellinghouse in the interest of visual amenity and public health, from
unsympathetic siting and design of developments normally carried out without
planning permission; these normally being permitted under Article 2(4) of the Town
and Country Planning (General Permitted Development) (Scotland) Order 1992 (as
amended).  
11. Pre-commencement Survey 
No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of nesting birds has been carried out by an
appropriately qualified person and has been submitted for the written approval of the
Planning Authority. In circumstances where species of interest are identified as being
present, or at risk from construction works, the survey shall further provide suggested
avoidance and or mitigation measures, including timing constraints, to address such
presence or risk. The development shall be implemented in accordance with the
measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation.  
12.  Implement/Operate Development in Accordance with Identified Mitigation
Measures 
Notwithstanding the provisions of Condition 1, the development shall be undertaken
in accordance with the mitigation measures set out in the documents titled ‘Preliminary
Ecological Appraisal’ dated August 2022 and ‘Otter & Bat Surveys Report’ dated
September 2022.   
Reason: In order to protect natural heritage assets in the interest of nature
conservation.  
13. Contaminated Land 
Unless otherwise agreed in writing and in advance by the Planning Authority, prior to
any development commencing on site, a scheme will be submitted by the Developer
(at their expense) to identify and assess potential contamination on site.  No
construction work shall commence until the scheme has been submitted to, and

Page 9

approved, by the Planning Authority, and is thereafter implemented in accordance with
the scheme so approved.   
The scheme shall be undertaken by a competent person or persons in accordance
with relevant authoritative guidance including PAN 33 (2000) and BS10175:2011 or,
in the event of these being superseded or supplemented, the most up-to-date
version(s) of any subsequent revision(s) of, and/or supplement(s) to, these
documents. This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority, and
must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the scope
and method of recommended further investigations shall be agreed with the
Council prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken
in the following sequence: 
b) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents. 
c) Development and agreement of a remedial strategy (if required) to treat/
remove contamination ensuring the site is made suitable for its proposed use
(this shall include a method statement, programme of works, and proposed
verification plan). 
d) Submission of a verification report for any agreed remedial actions detailing
and evidencing the completion of these works. 
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required
as part of the development construction detail, commencement must be agreed in
writing with the Planning Authority. 
Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination have
been adequately addressed. 
14.  Tree Retention and Protection 
No development shall commence until a scheme for the retention and safeguarding of
trees during construction has been submitted to and approved by the Planning
Authority. The scheme shall comprise: 
i) Details of all trees to be removed and the location and canopy spread of
trees to be retained as part of the development; 
ii) A programme of measures for the protection of trees during construction
works which shall include fencing at least one metre beyond the canopy
spread of each tree in accordance with BS 5837:2005 “Trees in Relation to
Construction”. 
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped, topped

Page 10

or felled other than in accordance with the details of the approved scheme unless
otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation.  
15.  Phasing of Development 
No development shall commence until such time as the associated replacement
agricultural building (either as granted under prior notification ref. 24/00259/PNAGRI;
or subsequently renewed/amended, or an alternative scheme for the provision of a
replacement building that has been acknowledged as such in writing by the planning
authority) has been erected and made available for agricultural use in the management
of Lagganulva Farm. 
Reason: In order to ensure that the development of the existing barn the subject of
this current planning permission is delivered in accordance with the stated
management and development of the remainder of the agricultural holding.