Cabinet
A Meeting of the Cabinet of North Ayrshire Council will  be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
07 November 2023 at 14:30 to consider the undernoted business.
Meeting Arrangements ­ Hybrid Meetings
This meeting will be held on a predominantly physical basis but with 
provision, by prior notification, for remote attendance by Elected 
Members in accordance with the provisions of the Local Government 
(Scotland) Act 2003.  Where possible, the meeting will be live­streamed 
and available to view at https://north­ayrshire.public­i.tv/core/portal/home
.  
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 29 August 
2023 and the Special meetings of the Cabinet held on 19 September 
2023 and 3 October 2023 will be confirmed and the Minutes signed in 
accordance with Paragraph 7 (1) of Schedule 7 of the Local Government 
(Scotland) Act 1973 (copy enclosed).
EDUCATION ITEMS FOR DECISION
Reports by the Executive Director (Communities and Education)
3 Annual Participation Measure 2023
Submit a report by the Executive Director (Communities and Education) 
to update Cabinet on the Annual Participation Measure (APM) for 2023 
(copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
4 Annual  Report  –  School  and  Early  Learning  and  Childcare
Inspections 2022­23
Submit a report by the Executive Director (Communities and Education) 
to inform Cabinet of the performance of North Ayrshire schools and early 
learning and childcare settings in external inspections, with a focus on 
those published during session 2022­23 (copy enclosed).
5 Education Authority Annual Plan 2023­24
Submit a report by the Executive Director (Communities and Education) 
to seek approval for the publication of the Education Authority Annual 
Plan for 2023­24 (copy enclosed).
6 Proposals for Community Investment Fund (CIF) Expenditure
Submit a report by the Executive Director (Communities and Education) 
to determine applications by Locality Partnerships to allocate CIF funding 
to proposed projects (copy enclosed).
7 Cost of Living Crisis
Submit a report by the Executive Director (Communities and Education) 
to provide a third progress report to Cabinet in relation to the North 
Ayrshire Council responses to the current cost of living crisis and 
associated investments and funds (copy enclosed).
GENERAL BUSINESS FOR DECISION
Reports by the Director (Health and Social Care Partnership)
8 Performance Information – Drug and Alcohol Services – April 2022 to
31 March 2023
Submit a report by the Director (Health and Social Care Partnership) 
to provide an update on the national and local drug and alcohol related 
targets and standards and performance in North Ayrshire. To provide 
assurance to Members of the performance, actions and service 
developments being progressed to address the significant challenges for 
our communities (copy enclosed).
Reports by the Chief Executive
9 Capital Programme Performance to 31 August 2023
Submit a report by the Head of Service (Finance) to advise Cabinet of 
progress in delivering the Capital Investment Programme 2023/24 to 31 
August 2023 (copy enclosed).
10 Revenue Budget 2023/24 : Financial Performance to 31 August 2023
Submit a report by the Head of Service (Finance) advise Cabinet of the 
financial performance for the Council at 31 August 2023 (copy enclosed).
11 Treasury Management and Investment Mid­Year Report 2023/24
Submit a report by the Head of Service (Finance) to provide Cabinet with 
a Treasury Management update for the period 1 April to 30 September 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
2023 (copy enclosed).
12 Year End Performance Reporting: Council Plan Year End Progress
Report  2022­23;  Annual  Performance  Report  2022­23;  and  Local
Government  Benchmarking  Framework  Analysis  of  2023  Data
Release
Submit a report by the Head of Service (Democratic Services) to advise 
Cabinet on progress of our Council Plan priorities (copy enclosed).
Reports by the Executive Director (Place)
13 Roads Winter Service and Weather Emergencies Plan 2023/24
Submit a report by the Executive Director (Place) to seek approval from 
Cabinet for the Roads Winter Service and Weather Emergencies Plan 
2023/24 (copy enclosed).
14 Scottish Government Consultations on Burials and Cremation
Submit a report by the Executive Director (Place) to seek approval of the 
proposed responses to the Scottish Government consultations on Burials 
and Cremation (copy enclosed).
15 Strategic Housing Investment Plan 2024­2029
Submit a report by the Executive Director (Place) to seek Cabinet 
approval of the Strategic Housing Investment
Plan 2024 – 2029 (copy enclosed).
16 Former  St  Mary’s  Primary  School,  Largs  –  SHIP  Social  Housing
Development Proposal
Submit a report by the Executive Director (Place) to seek approval for the
inclusion of the former St Mary’s Primary School site, Largs as a 26­unit 
Council social housing development in the North Ayrshire SHIP 2024­
29 (copy enclosed).
17 Council  House  Buy­back  Programme  to  Accommodate  Ukrainian
Displaced People
Submit a report by the Executive Director (Place) to seek Cabinet 
approval to purchase up to 40 properties to accommodate Ukrainian 
households for three years using Scottish Government grant being made 
available (copy enclosed).
18 National Islands Plan Review Consultation Response
Submit a report by the Executive Director (Place) to provide an update on
the Council’s engagement in the consultation on the review of the 
National Islands Plan by the Scottish Government and to seek approval 
for the proposed consultation response (copy enclosed).
19 Exclusion of the Public ­ Para 9
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
9 of Part 1 of Schedule 7A  of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer.
20 Irvine – Montgomerie Park: Marketing & Disposal Strategy for Sites E,
F and G
Submit a report by the Executive Director (Place) to seek approval for the
marketing and disposal of the remaining
residential development sites, Sites E, F and G, at Montgomerie Park.
21 The Portal Cafe
Submit a report by the Executive Director (Communities and Education) 
to seek Cabinet’s approval to transfer the operation of the Portal Café to 
North Ayrshire Leisure Limited (NALL).
22 Urgent Items
Any other items which the Chair considers to be urgent.
Webcasting
Please note: this meeting may be filmed/recorded/live­streamed to the
Council's internet site and available to view at https://north­ayrshire.public­
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live­streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for  webcasting  or  training  purposes  and  for  the  purpose  of  keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the meeting. 
This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north­ayrshire.gov.uk.
4

Page 5

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet Sederunt
Elected Members
Marie Burns (Chair)
Shaun Macaulay (Vice­Chair)
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen
Church Representatives
Mr Andrew Bruce
Ms Elizabeth Turbet
Rev Mark Goodman
Teaching Representative
Ms Jacqui MacKenzie
Youth Council Representatives 
Chair:
Apologies:
Attending:
5

Page 6

6

Page 7

Cabinet
29 August 2023 
IRVINE, 29 August 2023 - At a Meeting of the Cabinet of North Ayrshire Council at
2.30 p.m. 
Present
Marie Burns, Tony Gurney, Alan Hill, Margaret Johnson, Christina Larsen and Shaun
Macaulay. 
Also Present
Cameron Inglis and Eleanor Collier. 
In Attendance 
C. Hatton, Chief Executive, M. Boyd, Head of Service and D. Forbes, Senior
Manager (Finance) (Chief Executive’s Service); A. Sutton, Executive Director and R.
Leith, Head of Service (Communities) (Communities & Education); T. Reaney, Head
of Service (Neighbourhood Services), N. McIlvanney, Interim Head of Service
(Growth, Investment & Employability), L. Kirk, Interim Head of Service (Economic
Development & Regeneration) and F. Ellis, Senior Manager (Housing & Public
Protect) (Place); P. Doak, Head of Service (HSCP Finance & Transformation)
(Health and Social Care Partnership); A. Craig, Head of Service, I. Hardy, Team
Manager (Policy, Performance & Elections), J. Hutcheson, Senior Communications
Officer (Communications), S. Wilson and H. Clancy, Committee Services Officers
(Democratic Services). 
Chair
Marie Burns in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting of the Cabinet held on 30 May 2023 and 13 June 2023
(Special) were confirmed and the Minutes signed in accordance with Paragraph 7 (1)
of Schedule 7 of the Local Government (Scotland) Act 1973. 
3. Exclusion of the Press and the Public 
Cabinet resolved in terms of Section 50(A)4 of the Local Government (Scotland) Act
1973, to exclude from the Meeting the press and the public for the following item of
business on the grounds indicated in terms of Paragraph 9 of Part 1 of Schedule 7A
of the Act. 
Agenda Item 2
7

Page 8

4. BUILD Project – Exempt Item 
Submitted a report by the Executive Director (Place) providing Cabinet with
an update on the current status of the BUILD project. 
Noted. 
Please note – the following item was heard by the Audit & Scrutiny Committee
on 12 September 2023, please refer to the minute of that Committee for the
decision. 
5. B714 Upgrade 
Submitted a report by the Executive Director (Place) updating Cabinet on the
progress of the B714 Upgrade and seeking approval for the reallocation of funding to
support project delivery. Further information on the funding reallocation proposals were
attached at Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: 
• levelling up inflationary pressures and what mitigating factors were in place to
manage these; and
• whether a justification had been provided to the Council on why a previously
expressed commitment to fund the improvements was not being adhered to. 
The Cabinet agreed (a) to the submission of the updated Outline Business Case to
the UK Government for approval, informed by feedback on the draft submission; and
(b) to approve the reallocation of Council funding, detailed at Appendix 1, to support
the delivery of the project, subject to the approval of the Final Business Case. 
6. Revenue Budget 2023/24: Financial Performance to 30 June 2023 
Submitted a report by the Head of Service (Finance) advising Cabinet of the financial
performance for the Council at 30 June 2023. 
Members asked questions and were provided with further information in relation to: 
• action being taken to address and reduce the overspend within the Health and
Social Care Partnership; and
• the cause of the overspend within Waste Services and the work being
undertaken to reduce this. 
The Cabinet agreed (a) to approve the virements detailed at Appendix 7 to the
report; and (b) to note (i) the information and financial projections outlined in the
report, (ii) the latest financial projection for the Health and Social Care Partnership
highlighted at section 2.6 of the report and (iii) the potential impact of the review of
Strathclyde Pension Fund on future budget pressures. 
8

Page 9

7. Capital Programme and Treasury Management Performance to 30 June
2023 
Submitted a report by the Head of Service (Finance) advising Cabinet of progress in
delivering the Capital Investment Programme 2023/24 and the associated Treasury
Management performance to 30 June 2023.
Members asked a question and were provided with further information in relation to
the major risk, and long-term impact, of inflationary pressures. 
The Cabinet agreed (a) to approve the virement proposals noted within the HRA
programme detailed at Appendix 2 to the report, and (b) to note (i) the revisions to
budgets outlined in the report, (ii) the General Services and HRA revised budgets at
30 June 2023, (iii) the forecast expenditure to 31 March 2024, including the
additional investment of £5.000m to support the B714 upgrading project as detailed
at sections 2.12 and 2.13 of the report; and (iv) the estimated performance against
the Prudential Indicators set out in the Treasury Management and Investment
Strategy. 
8. Health and Safety Annual Report 2022/23 
Submitted a report by the Head of Service (Finance) providing Cabinet with an
updated report on the Health and Safety performance within Council Services during
2022/23. 
Members asked questions and were provided with further information in relation to
the Working Group that was established and the action taken to reduce the number
of Aggression and Violence incidents within the Education Service. 
Noted. 
Please note – the following item was heard by the Audit & Scrutiny Committee
on 12 September 2023, please refer to the minute of that Committee for the
decision. 
9. Council Tax Multipliers: Scottish Government Consultation 
Submitted a report by the Head of Service (Finance) for Cabinet to consider the
consultation response in respect of the review of the level of Council tax multipliers for
Band E to Band H properties. The proposed consultation response was noted at
Appendix 1 to the report. 
Having noted the importance of recognising that this was a consultation response,
and that decisions on Council Tax setting were made at full Council as part of the
annual budget setting process and that no changes were being made to the Council
Tax levels currently set, the Cabinet agreed to approve the Consultation response
from North Ayrshire Council included in Appendix 1 to the report, for submission to the
Scottish Government by 20 September 2023. 
9

Page 10

10. North Ayrshire Council Plan 2023-28: Performance Management Framework 
Submitted a report by the Chief Executive to consider and agree the Council Plan
2023 – 2028 Performance Management Framework. The Council Plan was attached at
Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: 
• engagement with partners and partnership working, both locally and
nationally, for a whole system approach to wider issues; and
• whether the targets set out in the report were both ambitious and realistic. 
The Cabinet agreed (a) to approve the Council Plan 2023-28 Performance
Management Framework attached at Appendix 1 to the report; and (b) to refer the
Performance Management Framework to the Audit and Scrutiny Committee for
consideration. 
11. Crown Estates Scotland – Memorandum of Understanding 
Submitted a report by the Executive Director (Place) seeking approval to renew a
Memorandum of Understanding with Crown Estates Scotland. 
The Cabinet agreed that the Council continues the partnership agreement with Crown
Estates Scotland, to further explore investment opportunities to support North Ayrshire
Council’s regeneration and economic development priorities. 
Please note – the following item was heard by the Audit & Scrutiny Committee
on 12 September 2023, please refer to the minute of that Committee for the
decision. 
12. Visitor Levy (Scotland) Bill 
Submitted a report by the Executive Director (Place) seeking approval to respond to
active consultations on the Visitor Levy (Scotland) Bill and setting out working
arrangements for exploration of the potential benefit and impact of a visitor levy. 
The Cabinet, having welcomed the principle of having fiscal flexibility at a local level,
irrespective of whether it was ultimately exercised, agreed (a) to authorise officers to
respond to consultations on the Visitor Levy (Scotland) Bill as detailed in Appendix 1
to the report by expressing support for the introduction of a levy, subject to further
exploration of costs and benefits; and to note the formation of an internal Visitor Levy
Officer Working Group which would engage with the Tourism Forum, businesses and
regional stakeholders to inform any future emerging proposals related to the
implementation of a visitor levy. 
13. Tree and Woodland Management Policy 
Submitted a report by the Executive Director (Place) seeking Cabinet approval on
the proposed updated Tree and Woodland Management Policy. The updated Tree
and Woodland Management Policy was attached at Appendix 1 to the report.
10

Page 11

The Cabinet agreed to approve the updated Tree and Woodland Management
Policy, attached at Appendix 1 to the report. 
14. Memorial benches, Plaques and Other Memorial Opportunities 
Submitted a report by the Executive Director (Place) providing an overview and
seeking Cabinet approval of the appropriate options to be supported for memorials
for members of the public to remember a loved one. In addition to the examples of
the options from other organisations/charities contained in paragraphs 2.23 and 2.24
of the report, the offering from the local community charity in Arran at Arran Memorial
Garden in Shiskine was highlighted. 
The Cabinet agreed to approve the range of memorials options set out in the report. 
15. Proposals for Community Investment Fund (CIF) Expenditure 
Submitted a report by the Executive Director (Communities and Education) on
applications by Locality Partnerships to allocate CIF funding to proposed projects.
Appendices 1-3, respectively, set out applications by Arran Locality Partnership (Arran
Geopark) for £79,853, The Three Towns Locality Partnership (Saltcoats Active Lifestyles
Team (SALT)) for £45,600 and Kilwinning Locality Partnership (the Corra Foundation)
for £36,000 across a three-year period. 
The Cabinet, having reviewed the submissions against the CIF criteria, agreed to
approve the applications in relation to (i) Arran Geopark, (ii) Saltcoats Active Lifestyle
Team (SALT) and (iii) the Corra Foundation, in the amount of £79,853, £45,600 and
£36,000 (the latter across a three-year period). 
The meeting ended at 4:05 p.m.
11

Page 12

Special Cabinet
19 September 2023 
IRVINE, 19 September 2023 - At a Special Meeting of the Cabinet of North Ayrshire
Council at 2.00 p.m. 
Present
Marie Burns, Tony Gurney, Margaret Johnson, Christina Larsen and Shaun
Macaulay. 
Also Present
Eleanor Collier, Davina McTiernan and Chloé Robertson. 
In Attendance 
C. Hatton, Chief Executive, M. Boyd, Head of Service (Finance) (Chief Executive’s
Service); A. Sutton, Executive Director (Communities & Education); R. McCutcheon,
Executive Director (Place); F Walker, Head of Service (People & ICT); A. Craig,
Head of Service, M, McColm, Senior Manager (Communications), S. Wilson and C.
Stewart, Committee Services Officers (Democratic Services). 
Apologies
Alan Hill 
Chair
Marie Burns in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Council Tax Multiplier: Scottish Government Consultation 
Submitted report by the Chief Executive on the recommendations of the Audit and
Scrutiny Committee following a call-in request relating to the consultation response
in respect of the review of the level of Council tax multipliers for Band E to Band H
properties. A copy of the original report presented to Cabinet on 29 August 2023 was
attached at Appendix 1 to the report while Appendices 2A and 2B provided
information on the call-in requests.  Appendices 3A and 3B detailed comments on
the call-ins from Officers with Appendices 4 and 5 providing the Minute of the Audit
and Scrutiny Committee held on 12 September 2023 and an amended consultation
response reflecting the Islands Act duty. 
The Cabinet considered the request by the Audit and Scrutiny Committee to
reconsider its earlier decision to approve the consultation response from North
Ayrshire Council. Members sought further information on the requested extension to
the consultation response deadline and the process to take the report to the next
meeting of the Council.
12

Page 13

Accordingly, the Cabinet (a) agreed not to accept the recommendation of the Audit
and Scrutiny Committee to reconsider its earlier decision to approve the consultation
response from North Ayrshire Council while adapting the request to include
reference to an Islands Impact Assessment within the response; and (b) noted that,
in terms of Standing Order 26.7, the matter be referred to the next meeting of the
Council for determination. 
3.  Urgent Items 
There were no urgent items. 
The meeting ended at 2.10 p.m.
13

Page 14

Cabinet
3 October 2023 
IRVINE, 3 October 2023 - At a Meeting of the Cabinet of North Ayrshire Council at
2.30 p.m. 
Present
Marie Burns, Shaun Macaulay, Alan Hill, Margaret Johnson and Christina Larsen;
and Andrew Bruce and Elizabeth Turbet (Church Representatives) and Jacqui
MacKenzie (Teaching Representative). 
In Attendance 
A. Sutton, Executive Director and A. McClelland, Head of Service (Education)
(Communities & Education); R. McCutcheon, Executive Director, L. Kirk, Interim
Head of Service (Economic Development & Regeneration) and L. Cree, Senior
Manager (Property Management & Investment) (Place); C. Cameron, Director and S.
Hunter, Chief Social Work Officer (Health and Social Care Partnership); F Walker,
Head of Service (People & ICT); A. Craig, Head of Service (Democratic), J.
Hutcheson, Senior Communications Officer (Communications), H. Clancy and D.
McCaw, Committee Services Officers (Chief Executive’s Service). 
Chair
Marie Burns in the Chair. 
Apologies
Tony Gurney and Rev. Mark Goodman (Church Representative). 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Ayrshire College and Irvine Royal Academy Skills Centre of Excellence 
Submitted report by the Executive Director (Communities and Education) providing
an update on the revised position in relation to the Ayrshire College Skills Centre of
Excellence at Irvine Royal Academy resulting in a revised approach to delivery of
Developing the Young Workforce, with a focus on the Future Skills Hub at Kilwinning
Campus. 
The Cabinet acknowledged the improvement journey undertaken at Irvine Royal
Academy by staff and young people within the community and recognised the
excellent School-College Partnership developments and Future Skills Hub facility at
Kilwinning Campus.   
The Cabinet agreed to (a) welcome the School-College Partnership developments
and the Future Skills Hub approach; and (b) otherwise note the revised position in
relation to the Ayrshire College Skills Centre of Excellence at Irvine Royal Academy. 
14

Page 15

3. Education Service Standards and Quality Report 2022-23 
Submitted a report by the Executive Director (Communities and Education) on key
progress towards the Education Service Improvement Priorities and the National
Improvement Framework Priorities for session 2022-23.  The Education Service
Standards and Quality Report 2022-23 were detailed at Appendix 1 to the report,
including principal improvement activities undertaken throughout the academic
session 2022-23 and key performance information on learner outcomes. 
The Cabinet welcomed the report and acknowledged the educational challenges
faced across North Ayrshire following the Covid-19 pandemic and also in terms of
deprivation. 
Members asked questions and were provided with further information in relation to:- 
• established links in terms of career pathways for pupils;
• the offer from Ayrshire College to provide a ‘vocational burst’ programme to
extend the range of skills and vocational activities available to young people
deciding what to progress into the senior phase and beyond;
• ongoing work within schools in terms of attendance levels;
• the inclusion of stretch aims for improvement over the next three years; and 
• positive inspections across schools in North Ayrshire over the last year. 
The Cabinet agreed to (a) approve publication of the document set out at Appendix 1
to the report; and (b) otherwise note the content of the report. 
4. Chief Social Work Officer Annual Report 
Submitted report by the Director (Health and Social Care Partnership) on the Chief
Social Work Officer Annual Report, as required by the Scottish Government, and
covering the period 1 April 2022 to 31 March 2023.  The report provided information
on the successes and challenges in relation to the past year and noted the positive
contributions to individuals, families and communities across North Ayrshire while
highlighting the key risks for 2024. 
The Cabinet welcomed the report and acknowledged the challenges faced,
particularly in relation to care and mental health, across North Ayrshire. 
Members asked questions and were provided with further information in relation to:- 
• strengthening established care links with communities through the HSCP
Locality Forums and Community Planning Locality Partnerships; and
• current and future care capacity across North Ayrshire. 
The Cabinet agreed to note the contents of the Chief Social Worker Annual Report
2022-23. 
15

Page 16

5. Lease Disposal – Additional Area at Nethermiln Playing fields, West
Kilbride 
Submitted report by the Executive Director (Place) on the lease of the football pitch
at Kirkton Glen and Nethermiln Playing Fields, West Kilbride to West Kilbride
Community Sports Club for a period of 25 years, with an option to extend for a
further 25 years.  The lease disposal area was detailed at Appendix 1 to the report. 
The Appendix also set out previous areas leased and provided detail on additional
areas which could be added to the lease, allowing for the full redevelopment of the
sports facilities within Kirkton Glen. 
The Cabinet agreed (a) to approve the lease disposal of the football pitch at Kirkton
Glen and Nethermiln Playing Fields to West Kilbride Sports Club for a period of 25
years, with an option to extend for a further 25 years at a nominal rent of £1 per
annum, exclusive of VAT. 
6. North Ayrshire Asset Management Strategy and Plans 
Submitted report by the Executive Director (Place) on the refreshed North Ayrshire
Corporate Asset Strategy and associated Asset Management Plans.  Appendix 1 to
the report detailed the full Strategy and Plans which reflected updated priorities and
challenges. 
The Cabinet acknowledged the work carried out by services in production of the
comprehensive Strategy and Action Plans. 
The Cabinet agreed to approve the North Ayrshire Corporate Asset Strategy and
Plans as detailed at Appendix 1 to the report. 
7. Vacant and Derelict Land Strategy 2023-2028 
Submitted report by the Executive Director (Place) seeking approval of the Vacant
and Derelict Land Strategy 2023-2028, detailed at Appendix 1 to the report. 
The Cabinet acknowledged the work carried out by the service in production of the
comprehensive Strategy and Action Plans. 
The Cabinet agreed to approve the Vacant and Derelict Land Strategy 2023-2028
detailed at Appendix 1 to the report. 
8. Local Transport and Active Travel Strategy 2023-2028 
Submitted report by the Executive Director (Place) seeking approval for the Local
Transport and Active Travel Strategy 2023-2028, detailed at Appendix 1 to the
report. 
The Cabinet acknowledged the work undertaken by the service in obtaining external
funding packages to encourage modifications to travel options within communities. 
16

Page 17

The Cabinet agreed to approve the proposed Local Transport and Active Travel
Strategy 2023-2028, detailed at Appendix 1 to the report. 
The meeting ended at 3.25 p.m. 
17

Page 18

18

Page 19

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Annual Participation Measure 2023 
Purpose:  To update Cabinet on: 
(i) the Annual Participation Measure (APM) for 2023 
Recommendation:  That Cabinet:   
a) Notes the content of the report, including the improvement in
the APM for North Ayrshire for 2023; and
b) Notes the improved collaboration to support this improvement. 
1. Executive Summary 
1.1 This report explains and summarises the Annual Participation Measure (APM) which is
a measurement of the proportion of 16–19-year-olds participating in education, training
or employment over a whole year (1st April-31st March). The indicator provides a
measure of the status of the wider aged 16-19 cohort – not just those who have left
school. 
1.2   The APM has been adopted in the Scottish Government’s National Performance
Framework as the measure of young people’s participation.  This has replaced the
school leaver destination follow up as the source of the national indicator in the
framework: Percentage of young adults (16–19-year-olds) participating in education,
training or employment. 
1.3   The current 2023 APM for North Ayrshire sits at 93.9% which is the highest on record
since the APM began in 2016 and continues a positive 3-year trend from 2021. 
2. Background 
2.1 The APM is published by Skills Development Scotland (SDS) and uses the shared data
set held by SDS on their Customer Support System.  The headline participation status
(participating, not participating and unconfirmed) is based on the classification with the
highest number of days over the year.   
Participation is defined as: 
• School pupil
• Further Education
• Higher Education
• Modern Apprenticeship
• Full-Time Employment
• Part-Time Employment
Agenda Item 3
19

Page 20

• Self-Employed
• Employability Fund Stages
• Other Formal Training; Personal/ Skills Development
• Voluntary Work. 
2.2 The Participation Measure data set is the shared status data for young people aged 16-
19 held on the SDS customer support system. Partners who input to the shared data
set are SDS, Local Authorities, Schools, Colleges, Student Awards Agency Scotland,
the Scottish Funding Council and Department for Work and Pensions. Central to the
creation of the shared dataset is the sharing of information to allow partners to identify
what young people are doing in ‘real time’ throughout their 16-19 journeys. It also allows
all partners to improve service delivery and provide a more tailored offer. 
2.3 The inclusion of HM Revenue & Customs (HMRC) data, for the first time in 2023, has
contributed to improved data quality and an increase in participation. Since April 2023,
HMRC has shared employment data with SDS for statistical purposes only. Although
the data did not cover the whole of the period of interest it led to an increase in young
adults reported as participating in employment and a reduction in those with an
unconfirmed status. 
2.4 Although the APM publication is annual, local authorities and schools can access their
own data via the SDS 16+ Data Hub at any time. The Data Hub is updated monthly by
all partners and allows ongoing and specific targeting of young people to support
partnership working to improve outcomes. 
2.4    As Shown in Appendix 1, the 2023 APM showed that of the 5,872 16-19 year olds in
North Ayrshire 93.9% were in education, employment or training and personal
development. This is the highest on record since the APM started in 2016. 
2.5 Within specific ages, trends are notable. Across the years on record since 2016,
average APM within North Ayrshire for specific ages are; 
• 16yr olds- 99.1%
• 17yr olds- 96.4%
• 18yr olds- 92.5%
• 19yr olds- 87.2% 
2.5 As shown in Appendix 2, North Ayrshire has the 2nd highest level of improvement in
participation for young people when compared with all local authority areas in Scotland
highlighting the need for and success of targeted interventions. 
2.6 As demonstrated in Appendix 3, the 2023 figure is the continuation of a positive trend
demonstrated since 2016 and reflects the strong partnership working contributing to
this. 
2.7 In 2018, No One Left Behind outlined the need for a better aligned and integrated
employability support system.  A Partnership Agreement between Local Authorities and
Scottish Government supported the shared ambition to deliver transformation change
in Scotland’s employability services. Local Employability Partnerships (LEPs) were
established with responsibility for integration and alignment of local services, ensuring
no one was left behind.   
20

Page 21

2.8 The North Ayrshire Local Employability Partnership (LEP) includes representatives 
from the following organisations: 
• North Ayrshire Council:
Employability 
Business Support
Education 
Children, Families & Justice 
Connected Communities 
• DWP
• Ayrshire College 
• Skills Development Scotland
• Ayrshire Chamber of Commerce, DYW Regional Lead, Ayrshire 
• TACT as a partner in the Third Sector Interface 
2.9 Schools work with young people, families and various partners to support an initial
positive destination. This includes an improved and focused partnership with SDS who
have officers based within each secondary school to offer a range of holistic and
targeted supports. In the latest published Insight figures, schools in North Ayrshire had
recorded their highest ever initial positive destination figure of 96%. 
2.10  Within each secondary school there is a now Developing Young Workforce (DYW)
Principal Teacher. This post is enabled through partnership funding from Education and
central government DYW grants. The DYW Principal Teacher works in close
partnership with school based SDS officers and Ayrshire Chamber of Commerce who
support employer engagement and a refreshed Work Experience programme. 
2.11 North Ayrshire Schools benefit from a strong School-College partnership with Ayrshire
College. This involves a blend of school-based courses to support attainment for young
people and also support transition to full-time FE courses. 
2.12 Through the LEP and the Employability Service, there are a range of interventions to
engage and prepare young people for the world of work.  Young people can be
supported with a dedicated Keyworker throughout their journey towards and into
employment.  These interventions include Ambition Agreements, Modern
Apprenticeships, sector specific programmes, work experience and accredited
vocational qualifications all delivered as part of Your Next Move, Working North
Ayrshire.  The youth programme is also extended to school leavers providing support 6
months in advance of their school leaving date. 
2.13 Using the Data Hub, the employability service has identified unknown and unemployed
young people and commission an engagement programme delivered by Barnardos to
visit young people in their homes and support them to engage in the range of services
delivered across North Ayrshire.   
21

Page 22

3. Proposals 
3.1 It is proposed that Cabinet:    
a) Notes the content of the report, including the improvement in the APM for North
Ayrshire for 2023; and
b) Notes the improved collaboration to support this improvement. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3  None. 
Equality/Socio-economic 
4.4 Targeted and specific interventions have been designed to ensure that all North
Ayrshire school leavers benefit from support to ensure that they are participating in
education, employment or volunteering. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report aligns with the Council Plan 2023-28 strategic aim to “transition to a
wellbeing economy, delivering prosperity, wellbeing and resilience for local people” and
more specifically “improving educational attainment and achievement and closing the
attainment gap” activities.   
Community Wealth Building 
4.7 North Ayrshire’s work in relation to positive destinations supports North Ayrshire’s
Community Wealth Building aspirations through providing high quality skilled workers
who can contribute to the local economy. In addition, initiatives which contribute to this
work provide a wealth of opportunities for local businesses and people seeking
employment in North Ayrshire. 
22

Page 23

5. Consultation 
5.1 Improved collaboration with partners is illustrated in the report. Ongoing consultation
takes place with young people to ensure the support being provided meets or exceeds
their needs. 
Audrey Sutton
Executive Director (Communities and Education) 
For further information please contact Kevin Herron, Senior Manager, on 01294 324450. 
Background Papers
0
23

Page 24

APPENDIX 1a 
North Ayrshire
Annual Participation Measure 2023
24

Page 25

APPENDIX 1b 
25

Page 26

APPENDIX 2 
Increase in Participation Measure by Local
Authority 22-23
26

Page 27

APPENDIX 3 
North Ayrshire Annual Participation Measure
2016-2023
27

Page 28

28

Page 29

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Annual Report – School and Early Learning and Childcare
Inspections 2022-23 
Purpose:  To inform Cabinet of the performance of North Ayrshire schools
and early learning and childcare settings in external inspections,
with a focus on those published during session 2022-23. 
Recommendation:  It is recommended that Cabinet: 
(a) Notes the contents of this report; and
(b) Commends the performance of schools and ELC settings in
inspections conducted by Education Scotland and the Care
Inspectorate. 
1. Executive Summary 
1.1 Education Scotland published inspection reports on eight educational establishments in
North Ayrshire in session 2022-23. The overall performance of our schools and centres
was very positive. 
1.2 The Care Inspectorate published inspection reports on seven local authority early
learning and childcare establishments in North Ayrshire in session 2022-23.  The
performance of these establishments was positive. 
1.3 Action has been taken by individual schools and early years establishments, supported
by the education service, to celebrate strengths and to address areas for improvement
identified in the inspection reports. 
2. Background 
2.1 Schools are subject to periodic external evaluation by the national inspection agency,
Education Scotland.  Early Learning and Childcare settings are inspected by both
Education Scotland and the Care Inspectorate. 
2.2 Education Scotland reports on the quality of school and early years provision under the
following quality indicators, taken from the self-evaluation framework How good is our
school? (4th edition): 
• Leadership of change
• Learning, teaching and assessment
• Ensuring wellbeing, equality, and inclusion
Agenda Item 4
29

Page 30

• Raising attainment and achievement (primary, secondary, ASN schools)
• Securing children’s progress (Early learning & childcare settings). 
2.3 In 2022, the Care Inspectorate introduced a new quality framework for daycare of
children, childminding and school-aged childcare. This quality framework is structured
around the following key questions: 
• How good is our care, play and learning?
• How good is our setting?
• How good is our leadership?
• How good is our staff team? 
2.4  All inspections focus on at least two quality indicators.  In session 2022-23, Education
Scotland carried out eight school inspections in North Ayrshire as part of a national
sample size of 250 schools. 
2.5 Education Scotland uses a six-point scale to report on the performance of the
educational establishment in each of the assessed quality indicators.  The categories of
the six-point scale are: excellent, very good, good, satisfactory, weak, and
unsatisfactory.  Further detail on the meaning of the six-point scale is included at
Appendix 2. 
2.6 In session 2022-23, the Education Scotland inspection outcomes in North Ayrshire
schools were as follows: 
School Inspection
Report
Date
1.3 Leadership
of change
2.3 Learning,
teaching and
assessment
3.1 Ensuring
wellbeing,
equality and
inclusion
3.2 Raising
attainment and
achievement
Ardeer Primary
School 07/03/2023 [Not assessed] Good [Not assessed] Very Good
Beith Primary
School 28/03/2023 Very Good Very Good Very Good Very Good
Greenwood
Academy 25/04/2023 Good Satisfactory Satisfactory Good
Auchenharvie
Academy 09/05/2023 [Not assessed] Very Good [Not assessed] Very Good
Glebe Primary
School 16/05/2023 Very Good Very Good Excellent Very Good
Skelmorlie
Primary School 16/05/2023 [Not assessed] Good [Not assessed] Good
Corrie Primary
School 29/08/2023 [Not assessed] Good [Not assessed] Good
Shiskine
Primary School 29/08/2023 [Not assessed] Good [Not assessed] Good 
2.7 In session 2022-23, the Education Scotland inspection outcomes in North Ayrshire early
years classes were as follows: 
School Inspection
Report
Date
1.3 Leadership
of change
2.3 Learning,
teaching and
assessment
3.1 Ensuring
wellbeing,
equality and
inclusion
3.2 Raising
attainment and
achievement
Ardeer Primary
Early Years 07/03/2023 [Not assessed] Very Good Not assessed Very Good
Beith Primary
Early Years 28/03/2023 Very Good Very Good Very Good Very Good
Corrie Primary
Early Years 29/08/2023 [Not assessed] Good [Not assessed] Good
30

Page 31

Shiskine
Primary Early
Years
29/08/2023 [Not assessed] Good [Not assessed] Good 
2.8 Since the introduction of the current inspection framework “How Good is our School?
(4th edition)” in session 2016-2017, there has been a total of 26 inspections by Education
Scotland across North Ayrshire’s schools and early years classes. Over that time frame,
the performance of North Ayrshire schools in Education Scotland inspections has been
positive overall.  By way of comparison in the table below, each grade has been
assigned a numerical value to show our average performance against the regional and
national performance.  The higher the value, the better the performance.   
Average grade assigned through Education Scotland inspection 2016-2023
(schools only):
Quality Indicator NAC 
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 4.45 3.85 3.75
Learning, teaching and assessment 4.21 3.82 3.69
Ensuring wellbeing, equality and inclusion 4.45 4.00 3.92
Raising attainment and achievement 4.17 3.78 3.67
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
Average grade assigned through Education Scotland inspection 2016-2023 (early
learning and childcare settings only (authority provision)):
Quality Indicator NAC
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 4.13 3.78 3.63
Learning, teaching and assessment 4.33 3.95 3.67
Ensuring wellbeing, equality and inclusion 4.25 4.10 3.96
Securing children’s progress 4.33 4.03 3.77
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
2.9 A further indicator of quality of educational provision overall is the percentage of school/
early learning and childcare inspections by Education Scotland which resulted in an
evaluation of “good” or better.  Data has been analysed since the introduction of the
current inspection framework in 2016-17 to the end of session 2022-23. Again, this
demonstrates a strong performance in North Ayrshire: 
Percentage of inspections resulting in an evaluation of “good” or better 2016-23
(schools only):
Quality Indicator NAC 
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 82% 64% 60%
Learning, teaching and assessment 88% 71% 62%
Ensuring wellbeing, equality and inclusion 82% 70% 69%
Raising attainment and achievement 83% 70% 61% 
31

Page 32

Percentage of inspections resulting in an evaluation of “good” or better 2016-23
(early learning and childcare settings only): 
Quality Indicator NAC
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 75% 66% 59%
Learning, teaching and assessment 83% 72% 59%
Ensuring wellbeing, equality and inclusion 75% 73% 74%
Securing children’s progress 83% 75% 65% 
2.10 The Education Scotland inspection reports (at Appendix 1) highlight a number of key
strengths common to several of the establishments they visited in North Ayrshire in
2022-23.  Notable strengths have been identified in the following areas: 
• Positive professional culture and staff commitment, working well as a team.
• Positive relationships 
• Strong leadership of senior leaders
• Nurturing and inclusive learning environments
• Engaged and motivated learners
• Learning experiences which are meeting needs and reducing barriers to learning  
• Improved learning outcomes / attainment. 
2.11 Areas for improvement in North Ayrshire were identified through the inspection reports.
All reports always have at least one identified area for improvement. The improvement
actions frequently include the wording “continue to” or “further develop”, demonstrating
that establishments are already beginning to take steps to address these points. 
2.12 In session 2022-23 the performance of North Ayrshire Early Learning and Childcare
centres and classes in Care Inspectorate inspections was positive. Care Inspectorate
reports can all be accessed via the website.  A total of seven Local Authority Early Years
centres and classes and seven partner nurseries were inspected, the evaluations for
which are summarised in the tables below: 
Early Learning
and Childcare
Setting (NAC)
Inspection
Report
Date
KQ1: How good
is our care, play
and learning?
KQ2: How good
is our setting?
KQ3: How good
is our
leadership?
KQ4: How good
is our staff
team?
Mayfield Primary
School Nursery
Class
20/09/2022 Very Good Very Good Very Good Very Good
Caledonia
Primary School
Nursery Class
12/10/2022 Good Very Good Good Very Good
Blacklands
Primary School
Nursery Class
18/01/2023 Good Good Good Good
St Peter’s
Primary School
Nursery Class
27/02/2023 Adequate Good Good Adequate
St Mark’s
Primary School
Nursery Class
17/03/2023 Good Good Good Good
St Bridget’s
Primary School
Nursery Class
30/03/2023 Good Very Good Good Good
Winton Primary
School Nursery
Class
16/05/2023 Good Good Good Very Good
32

Page 33

Early Learning
and Childcare
Setting (partners)
Inspection
Report
Date
KQ1: How good
is our care, play
and learning?
KQ2: How good
is our setting?
KQ3: How good
is our
leadership?
KQ4: How good
is our staff
team?
Treetops
Nursery (Irvine) 26/08/2022 Good Adequate Good Adequate
Bright
Beginnings Early
Years Centre
12/09/2022 Good Good Good Good
Treetops Too
(Saltcoats) 03/11/2022 Adequate Adequate Adequate Adequate
Rainbow
Childcare 23/11/2022 Very Good Very Good Very Good Very Good
Summerlea
House Nursery 21/03/2023 Good Good Good Good
Burnside House
Nursery 07/06/2023 Adequate Good Adequate Adequate
Treetops
Nursery (Irvine) 15/06/2023 Good Adequate Good Good 
2.13  The Care Inspectorate have recently updated their framework of quality indicators.
Nevertheless, in order to mirror the approach above (for Education Scotland
inspections) to providing trend information over several years, a calculation has enabled
average performances to be shown, covering the period 2016-23, both for North
Ayrshire’s local authority early learning and childcare settings, as well as for the South
West regional improvement collaborative.   
Average grade assigned through Care Inspectorate inspections in Early Learning
and Childcare (NAC settings):
New Quality Indicator
(from 2022-23)
Previous Quality
Indicator (before
August 2022)
North Ayrshire
Average
Performance 
2016-23*
SWEIC 
Average
Performance 
2016-23*
Quality of care, play and
learning 
Quality of care and
support 4.80 4.56
Quality of setting Quality of environment 4.69 4.42
Quality of leadership  Quality of management
and leadership 4.37 4.28
Quality of staff team  Quality of staffing 4.61 4.49
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
2.14 Common strengths from the Care Inspectorate reports on early learning and childcare
settings in North Ayrshire in 2022-23 are: 
• Children are happy, settled, confident and motivated
• Children are having fun playing with their friends
• The staff are kind, caring, compassionate and nurturing towards the children
• Warm and welcoming environments are provided where children are supported with
their learning. 
2.15 Care Inspectorate reports included three areas for improvement in total for early
learning and childcare establishments in North Ayrshire in 2022-23.  Plans are in place
to address these. Similarly, for the two areas for improvement identified through
previous inspections, the Care Inspectorate confirmed that improvements had been
made.
33

Page 34

2.16 As part of the service’s commitment to continuous improvement, inspection outcomes
have been used alongside feedback and engagement sessions with head teachers and
other senior officers, to feed into an evaluation of the service’s Quality Improvement
Framework, which has been refreshed and updated for session 2023-24. There is an
increased flexibility in approach, agreed at individual establishment level. The Quality
Improvement Framework is designed to give establishments, the service and elected
members assurance that self-evaluation is a key aspect of the work of our
establishments and that this leads consistently to planned improvements, based on
local contexts. 
3. Proposals 
3.1 It is recommended Cabinet: 
(a) Notes the contents of this report; and
b) Commends the performance of schools and ELC settings in inspections conducted
by Education Scotland and the Care Inspectorate. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Council priorities: 
The external inspection activity confirms the focus of the Education Service is to align with
the Council Plan 2023-28 strategic aim to “transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people” and more specifically “improving
educational attainment and achievement and closing the attainment gap” activities.   
34

Page 35

Community Wealth Building 
4.7 Better educational outcomes for children young people and adults, as well as increased
capacity building and resilience in communities are required to underpin a strong local
economy. North Ayrshire works in partnership with local early learning and childcare
providers (local businesses) to ensure the provision of care is a shared endeavour. 
5. Consultation 
5.1 There has been no specific consultation on the contents of this report. 
Audrey Sutton
Executive Director 
For further information please contact Andrew McClelland, Head of Service (Education),
on 01294 324413. 
Background Papers
0
35

Page 36

1   |    Ardeer Primary School and Nursery Class, North Ayrshire Council, 8214123 © Crown Copyright
7 March 2023
Dear Parent/Carer
In December 2022, a team of inspectors from Education Scotland visited Ardeer Primary School
and Nursery Class. During our visit, we talked to parents/carers and children and worked
closely with the headteacher and staff.
The inspection team found the following strengths in the school’s work.
• The effective teamwork across the school and nursery to support all children to achieve
the best possible outcomes in their learning.
• The highly effective use of data to inform planning and measure the effectiveness of
the strategies used to raise attainment in literacy and numeracy.
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council.
• Continue to support children across the school to become more independent in their
learning by providing more experiences that promote curiosity, independence, and
confidence.
• Review the process used to plan learning across the school to enable staff to develop
further creative teaching approaches.
Appendix 1
36

Page 37

2   |    Ardeer Primary School and Nursery Class, North Ayrshire Council, 8214123 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition) and How good is our early learning and childcare?. Quality
indicators help schools, local authorities and inspectors to judge what is working well and what
needs to be improved. Following the inspection of each school, the Scottish Government
gathers details of our evaluations to keep track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Ardeer Primary School
and Nursery Class 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment very good
Securing children’s progress very good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Pamela Adamson
HM Inspector
37

Page 38

1   |   Beith Primary School and Nursery Class, North Ayrshire Council, 8210829 © Crown Copyright
28 March 2023
Dear Parent/Carer 
In January 2023, a team of inspectors from Education Scotland visited Beith Primary School
and Nursery Class. During our visit, we talked to parents/carers and children and worked
closely with the headteacher and staff. 
The inspection team found the following strengths in the school’s work.
• Positive relationships are a strength of the school and nursery. Staff’s passion for and
commitment to children’s rights and wellbeing underpins their work. This is leading to
children who are confident, secure and happy in the school and nursery.
• The headteacher demonstrates strong and strategic leadership. She has created a
climate of continuous improvement which is developing leadership at all levels. 
• Teachers and practitioners have a strong collegiate approach to professional learning.
They work well together to improve children’s experiences which ensures children are
motivated and eager to learn.
• Senior leaders’ and staff’s effective use of data allows them to identify and plan the
correct interventions for children. They deliver well-planned support which is helping
children to experience success. 
The following areas for improvement were identified and discussed with the headteacher and
a representative from North Ayrshire Council.
• In the nursery, continue to develop approaches to support children to talk about their
wellbeing through the focus on children’s rights. This will support the planned work on
improving children’s opportunities to explore diversity.
• In the school, as planned, continue to develop approaches to assess children's learning
and track their progress across all curricular areas.
• In the school and nursery, continue to help children to identify and talk about the skills
they are developing through the range of experiences they take part in. 
38

Page 39

2   |   Beith Primary School and Nursery Class, North Ayrshire Council, 8210829 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition) and How good is our early learning and childcare?.
Quality indicators help schools, local authorities and inspectors to judge what is working well
and what needs to be improved. Following the inspection of each school, the Scottish
Government gathers details of our evaluations to keep track of how well Scottish schools are
doing. 
Here are Education Scotland’s evaluations for Beith Primary School
and Nursery Class 
Quality indicators for the primary stages Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion very good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion very good
Securing children’s progress very good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: 
Reports page | Inspection reports | Education Scotland
39

Page 40

3   |   Beith Primary School and Nursery Class, North Ayrshire Council, 8210829 © Crown Copyright
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Gillian Frew
HM Inspector 
40

Page 41

25 April 2023
Dear Parent/Carer
In February 2023, a team of inspectors from Education Scotland visited Greenwood
Academy. During our visit, we talked to parents/carers and young people and worked closely
with the headteacher and staff.
The inspection team found the following strengths in the school’s work.
• The leadership of the headteacher, supported by the leadership team have worked well
with staff to bring a sharper focus to school improvement and professional learning.
• Approaches to monitoring and tracking young people’s progress are used well to inform
school based interventions. The extended leadership team and staff are working well
together to drive forward school improvement, share practice and initiate change.
• Strong partnership working with the local college and local business is impacting
positively on learners’ experiences, supporting strong levels of personal development and
valuable qualifications.
• A strengthened focus on literacy and numeracy is leading to improved attainment for
young people throughout the school.
The following areas for improvement were identified and discussed with the headteacher and
a representative from North Ayrshire Council.
• More consistently high expectations of all young people and high-quality learning
experiences are required across the school to support, motivate and engage young
people.
• Continue to work together with young people, parents and staff to promote positive
relationships across the school. The school should also review their approaches to
wellbeing, equality and inclusion to ensure that all young people feel valued, included and
respected in the life and work of the school.
• Improve the quality of passes in National Qualifications and support more young people to
be ambitious and to achieve qualifications at the highest level.
1 | Greenwood Academy, North Ayrshire Council, 8215030 © Crown Copyright
41

Page 42

Here are Education Scotland’s  evaluations for Greenwood Academy 
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing.
Quality indicators Evaluation
Leadership of change good
Learning, teaching and assessment satisfactory
Ensuring wellbeing, equality and inclusion satisfactory
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Reports page | Inspection reports | Education Scotland
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools.
Teri McIntosh
HM Inspector
2 | Greenwood Academy, North Ayrshire Council, 8215030 © Crown Copyright
42

Page 43

1   |   Auchenharvie Academy, North Ayrshire Council, 8216134 © Crown Copyright 
9 May 2023 
Dear Parent/Carer 
In February 2023, a team of inspectors from Education Scotland visited Auchenharvie
Academy. During our visit, we talked to parents/carers and young people and worked
closely with the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
 The headteacher, senior leaders and staff have very successfully developed and maintained
a supportive, safe and positive environment for learning. Young people are eager
participants in their learning and demonstrate high levels of engagement. 
 Staff have a very strong understanding of the needs of all young people in their community.
They promote equity successfully by having high aspirations for all young people. This has
resulted in nearly all young people moving on to positive destinations, such as university,
college or work. 
 Young people are very aware of the skills they are developing and are well motivated to
learn across different contexts.   
 The headteacher and senior leaders have led effectively a positive and sustained approach
to improving the attainment and achievements for all young people. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
 Senior leaders and staff should continue to work together to increase further the consistency
of high-quality learning and teaching across the school. 
 Teachers should improve further their approaches to meeting the learning needs of all young
people, including the most able. 
43

Page 44

2   |   Auchenharvie Academy, North Ayrshire Council, 8216134 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Auchenharvie Academy 
Quality indicators Evaluation
Learning, teaching and assessment very good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale. 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Stuart Cathro
HM Inspector
44

Page 45

1   |   Glebe Primary School, North Ayrshire Council, 8211922 © Crown Copyright
16 May 2023
Dear Parent/Carer 
In February 2023, a team of inspectors from Education Scotland visited Glebe Primary
School. During our visit, we talked to parents/carers and children and worked closely with the
headteacher and staff.  
The inspection team found the following strengths in the school’s work.
• The outstanding leadership of the headteacher in driving forward improvement. She has
developed successfully an aspirational learning community. She empowers children and
staff to lead and make genuine and valuable contributions to the life of the school and
beyond. 
• The significant impact of approaches to nurture, promoting positive relationships and
improving wellbeing. This results in a highly supportive and inclusive learning environment
where children thrive.
• Articulate children who are motivated, resilient and keen to do their very best. They are
confident, responsible and respectful, showing kindness, care and understanding towards
each other. 
• The very strong approaches of all staff to meeting the needs of children who face barriers
to their learning. Led very effectively by the depute headteacher, all staff are highly
responsive to the needs and changing circumstances of children and their families. 
• The commitment and dedication of all staff in ensuring all children benefit from a broad
range of quality learning experiences. This results in very strong attainment and high
achievement for children. 
The following areas for improvement were identified and discussed with the headteacher and
a representative from North Ayrshire Council.
• Continue to take forward priorities for improvement, including promoting creativity and
innovation in learning, as planned. 
45

Page 46

2   |   Glebe Primary School, North Ayrshire Council, 8211922 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Glebe Primary School 
Quality indicators Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion excellent
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Susie Smith
HM Inspector
46

Page 47

1   |    Skelmorlie Primary School, North Ayrshire Council, 8213925 © Crown Copyright
16 May 2023
Dear Parent/Carer 
In March 2023, a team of inspectors from Education Scotland visited Skelmorlie Primary
School. During our visit, we talked to parents/carers and children and worked closely with
the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• Children who are confident, articulate and proud of their school. They experience
positive relationships with all staff and their peers. 
• The effective teamwork across the school to plan and deliver targeted support. All staff
work well together to support children with barriers to their learning. Children are well
supported in class and make good progress. 
• Children benefit from learning in a range of motivating learning spaces and through
increasingly relevant contexts. This supports children well to understand how their
learning in the classroom links to their life beyond school. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council 
• Continue to develop approaches to planning learning across the curriculum. Ensure all
learning builds on what children already know and is appropriately challenging. 
• Continue to develop approaches to tracking and monitoring children’s progress and
attainment. Ensure all staff use tracking information effectively to identify next steps in
learning for all children. 
47

Page 48

2   |    Skelmorlie Primary School, North Ayrshire Council, 8213925 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Skelmorlie Primary
School 
Quality indicators Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Marion Carlton
HM Inspector 
48

Page 49

1   |    Corrie Primary School and Nursery Class, North Ayrshire Council, 8200327 © Crown Copyright
29 August 2023
Dear Parent/Carer
In May 2023, a team of inspectors from Education Scotland visited Corrie Primary School and
Nursery Class. During our visit, we talked to parents/carers and children and worked closely
with the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• The headteacher has created a positive, nurturing and inclusive culture with a strong sense
of belonging across the school and nursery. Staff support children well which is resulting in
children who are motivated, engaged and confident in their learning. 
• In the nursery, the quality of the environments and learning experiences support children
well to make choices and to lead their play. 
• In the school, teachers plan well activities and experiences that meet the needs of all
children. This results in children making good progress in reading, listening and talking and
numeracy. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
• In the nursery, develop further approaches to planning and assessing children’s learning to
increase levels of challenge. This should support children to make the best possible
progress. 
• In the school, teachers should continue to improve children’s progress in writing. They
should plan more regular learning opportunities for children to write at length and apply skills
to a wider range of contexts and audiences. 
49

Page 50

2   |    Corrie Primary School and Nursery Class, North Ayrshire Council, 8200327 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition) and How good is our early learning and childcare?. Quality
indicators help schools, local authorities and inspectors to judge what is working well and what
needs to be improved. Following the inspection of each school, the Scottish Government
gathers details of our evaluations to keep track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Corrie Primary School
and Nursery Class 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment good
Securing children’s progress good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Gillian Frew
HM Inspector 
50

Page 51

1   |    Shiskine Primary School and Nursery Class, North Ayrshire Council, 8200629 © Crown Copyright
29 August 2023
Dear Parent/Carer
In May 2023, a team of inspectors from Education Scotland visited Shiskine Primary School and
Nursery Class. During our visit, we talked to parents/carers and children and worked closely
with the headteacher and staff.
The inspection team found the following strengths in the school’s work. 
• The headteacher has successfully created a professional culture where all staff learn
together to improve outcomes for children. Across the school and nursery, all staff work
very well together as a committed team. 
• The wide range of interesting experiences that children enjoy within the school, nursery
and in the community. These are developing children’s confidence and social skills
successfully. 
• The very positive, nurturing relationships between adults and children across the
school and nursery. Children are confident, engaged and enthusiastic learners who are
proud of their school community. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
• Continue to improve approaches to assessing and tracking children’s progress and
achievement in the school and nursery. 
• As planned, continue to develop approaches to planning, learning and teaching across all
curricular areas in the school and nursery. This should ensure that all children, including
those requiring additional support, receive the right level of support and challenge in their
learning.  
51

Page 52

2   |    Shiskine Primary School and Nursery Class, North Ayrshire Council, 8200629 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition) and How good is our early learning and childcare?.
Quality indicators help schools, local authorities and inspectors to judge what is working well
and what needs to be improved. Following the inspection of each school, the Scottish
Government gathers details of our evaluations to keep track of how well Scottish schools are
doing. 
Here are Education Scotland’s evaluations for Shiskine Primary School
and Nursery Class 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment good
Securing children’s progress good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
https://education.gov.scot/inspection-and-review/find-an-inspection-report/find-an-inspection-
report/details?id=4351 
What happens next?
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Helen Mulholland
HM Inspector
52

Page 53

How good is our school?
Appendix 3: The six-point scale
The six-point scale is a tool for grading the quality indicators. It is mainly used
by Education Scotland, local authorities and other governing bodies for the
purpose of national and/or local benchmarking across a number of establishments.
It is not necessary for individual schools to measure themselves against the
six-point scale although they may choose to do so. It should be noted that, when
a grading is applied, it is for the whole quality indicator. Individual themes
should not be graded. In education, an evaluation can be arrived at in a range
of contexts. We need to bear in mind that awarding levels using a quality scale
will always be more of a professional skill than a technical process. However,
the following general guidelines should be consistently applied.
Excellent An evaluation of excellent means that this aspect of the school’s work
is outstanding and sector-leading. The experiences and achievements
of all children and young people are of a very high quality. An evaluation
of excellent represents an outstanding standard of provision which
exemplifies very best practice, based on achieving equity and inclusion
and a deep professional understanding which is being shared beyond
the school to support system-wide improvement. It implies that very
high levels of performance are sustainable and will be maintained.
Very good An evaluation of very good means that there are major strengths in
this aspect of the school’s work. There are very few areas for
improvement and any that do exist do not significantly diminish
learners’ experiences. An evaluation of very good represents a high
standard of provision for all children and young people and is a
standard that should be achievable by all. There is an expectation that
the school will make continued use of self-evaluation to plan further
improvements and will work towards improving provision and
performance to excellent.
Good An evaluation of good means that there are important strengths within
the school’s work yet there remains some aspects which require
improvement. The strengths have a significantly positive impact on
almost all children and young people. The quality of learners’
experiences is diminished in some way by aspects in which
improvement is required. It implies that the school should seek to
improve further the areas of important strength, and also take action to
address the areas for improvement.
Satisfactory An evaluation of satisfactory means that the strengths within this
aspect of the school’s work just outweigh the weaknesses. It indicates
that learners have access to a basic level of provision. It represents a
standard where the strengths have a positive impact on learners’
experiences. While the weaknesses are not important enough to have
a substantially adverse impact, they do constrain the overall quality of
learners’ experiences. The school needs to take action to address
areas of weakness by building on its strengths.
Weak An evaluation of weak means that there are important weaknesses
within this aspect of the school’s work. While there may be some
strength, the important weaknesses, either individually or collectively,
are sufficient to diminish learners’ experiences in substantial ways. It
implies the need for prompt, structured and planned action on the part
of the school.
Unsatisfactory An evaluation of unsatisfactory means there are major weaknesses
within this aspect of the school’s work which require immediate
remedial action. Learners’ experiences are at risk in significant
respects. In almost all cases, this will require support from senior
managers in planning and carrying out the necessary actions to effect
improvement. This will usually involve working alongside staff in other
schools or agencies.
62 6353

Page 54

54

Page 55

NORTH AYRSHIRE COUNCIL 
7 November 2023   
North Ayrshire Council Cabinet 
Title:    Education Authority Annual Plan 2023-24 
Purpose:  To seek approval for the publication of the Education Authority
Annual Plan for 2023-24. 
Recommendation:  That Cabinet:
(a) Approves the draft Education Authority annual plan for 2023-
24 as aligned to the Council Plan priorities and the National
Improvement Framework priorities; and 
(b) Approves the publication of the plan. 
1. Executive Summary 
1.1 The Education Authority Annual Plan sets out how North Ayrshire Council will deliver
the strategic priorities of the National Improvement Framework. In addition, the plan
sets out the expected educational benefits of the improvement activities and how
success will be measured. 
1.2 The Education Authority Annual Plan primarily aligns with the Council Plan 2023-28
strategic aim to “transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people” and more specifically operationalises activities to improve
educational attainment and achievement and reduce the attainment gap. This plan
outlines an ambitious programme for how the Education Service will deliver better
outcomes for children, young people, and communities in North Ayrshire. 
2. Background 
2.1 The Education (Scotland) Act 2016, which amended the Standards in Scotland’s
Schools Act 2000, introduced the National Improvement Framework (NIF) for education
and includes a requirement on education authorities to produce annual plans and
reports in pursuance of the National Improvement Framework priorities. Annual plans
and reports should demonstrate progress and set out expected education benefits as
well as how success will be measured. 
2.2 The National Improvement Framework for Scottish Education 2023 was published in
December 2022 and set out the Scottish Government’s vision for Scotland’s children 
and young people’s progress in learning through excellence and equity. All schools and
education authorities have developed annual plans which focus on delivering: 
Agenda Item 5
55

Page 56

2.2.1 Excellence through raising attainment and improving outcomes: ensuring that
every child and young person achieves the highest standards in literacy and
numeracy, as well as the values, attitudes, knowledge, and skills necessary to
shape a sustainable future as successful learners, confident individuals,
responsible citizens, and effective contributors; and 
2.2.2 Achieving equity: ensuring every child and young person has the same
opportunity to succeed, no matter their background or shared protected
characteristics, with a particular focus on closing the poverty related attainment
gap. 
2.3 The key priorities set out in the National Improvement Framework for 2023 are: 
• Placing the human rights and needs of every child and young person at the centre
of education;
• Improvement in children and young people’s health and wellbeing;
• Closing the attainment gap between the most and least disadvantaged children and
young people;
• Improvement in skills and sustained, positive school-leaver destinations for all young
people; and
• Improvement in attainment, particularly in literacy and numeracy. 
2.4 The draft Education Authority annual plan for 2023-24, attached at Appendix 1, aligns
both to the national improvement priorities and sets these in the context of North
Ayrshire Council Plan 2023-28 strategic aim to “transition to a wellbeing economy,
delivering prosperity, wellbeing and resilience for local people.” 
2.5 In particular, this annual plan will operationalise and support the Council Plan activities
linked to “improving educational attainment and achievement and closing the attainment
gap.” 
2.6 This plan also aligns with North Ayrshire Children’s Service’s Plan and is underpinned
by transformation activity within the Education Service, undertaken through the Scottish
Attainment Challenge, Supporting Needs, and Expansion of Early Learning and
Childcare, to improve outcomes for children and young people. 
2.7 This plan contains stretch aims which articulate the service’s ambition to improve a
range of learner outcomes by 2026. The requirement to include three-year stretch aims
within this plan was introduced by Scottish Government in its updated Framework for
Recovery and Accelerating Progress, published in May 2023. 
2.8 Once approved, the education authority annual plan must be published. A copy has also
been sent to Scottish Ministers for reference. 
3. Proposals 
3.1 It is proposed that Cabinet: 
(a) Approves the draft Education Authority annual plan for 2023-24 as aligned to the
Council Plan priorities and the National Improvement Framework priorities; and 
56

Page 57

(b) Approves the publication of the plan. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 The production of an Education Authority annual plan is a requirement under the 
Education (Scotland) Act 2016. 
Equality/Socio-economic 
4.4 The Education Authority annual plan sets out specific improvement actions designed to 
improve educational outcomes for all, and also to reduce the impact of poverty on 
educational attainment. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This Service Plan aligns with the Council Plan 2023-28 strategic aim to “transition to a
wellbeing economy, delivering prosperity, wellbeing and resilience for local people” and
more specifically “improving educational attainment and achievement and closing the
attainment gap” activities.   
Community Wealth Building 
4.7 North Ayrshire’s Education Authority Annual Plan supports North Ayrshire’s Community
Wealth Building aspirations through providing high quality skilled workers who can
contribute to the local economy. In addition, initiatives outlined in the Education
Authority Annual Plan provide a wealth of opportunities for local businesses and people
seeking employment in North Ayrshire. 
5. Consultation 
5.1 The content of the Education Authority annual plan for 2023-24 has been agreed across 
the education service following rigorous self-evaluation in schools and across the
service of the progress towards the previous year’s plan. The process of arriving at the
service level priorities and strategic actions included engagement of Head Teacher and
the service leadership team. At school level, priorities are identified through
engagement with pupils, staff, parents/carers and key partners.
57

Page 58

Audrey Sutton
Executive Director of Communities and Education 
For further information please contact Andrew McClelland, Head of Service (Education),
on 01294324413. 
Background Papers
1 – Appendix 1
58

Page 59

Education Service
Improvement Plan
2023-26
Action Plan: 2023-24
59

Page 60

1 
Introduction from the Head of Service
We have no poverty of expectation, opportunity or aspiration for our children, young people and their families.  As a result, our over-riding aim is to improve
the educational outcomes for all learners, particularly those most disadvantaged learners.
In almost all aspects of learning there has been a consistent improving trend of achievement across the last decade in North Ayrshire. Throughout, our
schools and early learning and childcare settings have had a clear focus on raising attainment and reducing the poverty-related attainment gap, in line with
local and national priorities. Nevertheless, the arrival of the coronavirus pandemic in 2020 brought with it significant challenges for our families and
communities. National lockdowns, interrupted learning and significant changes in personal circumstances have impacted on the outcomes achieved by our
children and young people.
To mitigate this, we diverted significant resources.  We invested in supporting our children and young people and maintaining a determination to make
further progress in achievement for all learners. I am pleased to report that we are beginning to see the recovery take effect, with improvements in a range
of areas last session. 
As part of our ongoing process of self-evaluation, we have scrutinised how well we are doing as a service in supporting recovery and further improvement
and we have used this evidence to shape the content of this Education Service Improvement Plan for 2023-26. You will read in the forthcoming pages our
priorities for the next three years, which are aligned to North Ayrshire’s Council Plan and the National Improvement Framework for Education. This document
gives an overview of our priorities for the next three years and also summarises what we will do specifically in session 2023-
24, what we aim to improve and how we will measure success.
This plan is ambitious yet achievable for our children and young people. We are confident that outcomes for our learners
will continue throughout the life of this three-year plan and beyond. To demonstrate our sustained aspirations for and
commitment to the children and young people we serve, we have included stretch aims for improvement over the next
three years. 
All educational establishments have created their own improvement plans, aligned to the broad priorities and themes within
this plan, and tailored to the individual contexts and needs of learners in each school community. These plans are available
from individual establishments and are accessible electronically on their websites.
This plan builds on the excellent teamwork across our directorate. It reaffirms our commitment to continuous improvement
and to delivering for the children and young people of North Ayrshire.  Andrew McClelland
Head of Service
(Education)
60

Page 61

2 
The National Context 
This plan is aligned to the priorities of the 2023 National Improvement Framework (NIF) and is designed to deliver the dual aims of excellence and equity in
education for North Ayrshire’s children and young people. Our five priorities for the three years from 2023-26 are as follows: 
In the creation of this plan, we have built on a robust evaluation of our local context and the progress we have made to date in the improvement of
educational outcomes for young people. We have taken account of a range of key national drivers of change which will affect education provision in North
Ayrshire, including: 
Improvement in
attainment,
particularly in literacy
and numeracy
Closing the attainment
gap between the most
and least
disadvantaged children
and young people
Improvement in skills
and sustained, positive
school-leaver
destinations for all
young people
Improvement in
children and young
people's health and
wellbeing
Placing human rights
and needs of every
child and young person
at the centre of
education
The current national
programme of
educational reform
The ongoing national
review of the
curriculum
The ongoing national
review of supporting
needs
The priorities and
drivers of the National
Improvement
Framework
The refreshed
Attainment Scotland
Fund
The national Child
Poverty Delivery Plan
The ongoing work to
embed the articles of
the UNCRC
The Promise and its
associated delivery
plan
Revised Child
Protection Guidelines
The national Mental
Health and Wellbeing
Strategy
61

Page 62

3 
The Local Context
The Education Service in North Ayrshire Council is responsible for the education of 18,061 pupils across the authority’s primary, secondary and additional
support needs schools. A further 2,064 children attend early learning and childcare settings in North Ayrshire.   
The education service is part of North Ayrshire Council’s Communities and Education Directorate, which works towards developing a society where everyone,
has the same life chances to grow, prosper and have fulfilling and healthy lives. The education service has a central role in removing barriers and supporting
delivery of the priority outcome to ensure North Ayrshire’s children and young people have the best start in life.
Education in North Ayrshire is delivered through: 
primary
schools 48 8 secondary
schools 1
through
school
specialist
ASN campus 41
Council-managed
early learning and
childcare settings
14
Partnership early
learning and
childcare settings
17,691
pupils
1,434
teachers early learning
and childcare
staff 
Support staff
hours
387 12,700
1
62

Page 63

4 
North Ayrshire Council’s current priorities are:   This plan should be read in the context of these associated local plans: 
Improving as a Service
Our commitment to continuous improvement permeates the work of the service. Our establishments work very closely together with each other and our central team in
a culture of positive support and challenge. Our overarching approach can be summarised as follows:
• We strive to be a learning organisation. 
• We support the principles of subsidiarity and empowerment of our head teachers and school communities. 
• We evaluate the impact of the central education team in supporting consistency of improvement across our educational establishments.
• We work closely in partnership with colleagues across our Regional Improvement Collaborative and nationally
• We are investing in the quality of our teachers, practitioners and support staff 
• We are investing in our learning environments to ensure they maximise opportunities for engagement and achievement for all
• We are developing the leaders of tomorrow through our innovative leadership and facilitation programmes   
Our Council Plan
2023-28 (north-
ayrshire.gov.uk)
North Ayrshire
Children Services
Plan 2020/2023
(nahscp.org) 
North Ayrshire Child
Poverty Report
2021-22 and Action
Plan 2022-23
(north-
ayrshire.gov.uk) 
SWEIC - Regional
Improvement
Plan 2022-23
(north-
ayrshire.gov.uk) 
WELLBEING
To transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people. 
COMMUNITIES AND LOCAL DEMOCRACY
We will have active, inclusive and resilient
communities. 
CLIMATE CHANGE
To achieve net-zero by 2030. 
A SUSTAINABLE COUNCIL
A community wealth building council that is efficient
and accessible, maximising investment and focusing
resources towards our priorities.
63

Page 64

5 
NORTH AYRSHIRE COUNCIL
EDUCATION SERVICE IMPROVEMENT PLAN 2023-26
For the three years from 2023-26, the NAC Education Service Improvement Plan will focus on a stable and consistent set of priorities. Under each of the
five priorities, we will undertake improvement activities grouped together under key themes. These will remain consistent across the three years. Each
academic year, we will update the specific actions we will take forward during that school year in pursuit of these priorities.
The high-level priorities and themes of our Education Service Improvement Plan for 2023-26 are as follows:
PRIORITY 1 PRIORITY 2 PRIORITY 3 PRIORITY 4 PRIORITY 5
Improvement in attainment,
particularly in literacy and
numeracy
Closing the gap between the
most and least
disadvantaged children and
young people
Improvement in skills and
sustained, positive school-
leaver destinations for all
young people
Improvement in children
and young people s health
and wellbeing
Placing human rights and
needs of every child and
young person at the centre
of education
• High quality learning,
teaching and assessment
• Raising attainment and
achievement
• Interventions to reduce
gaps
• Specific focus on
identified target groups,
including care
experienced learners
• Improving skills
• Partnerships to improve
post-school learner
outcomes
• Improving attendance
• Supporting mental health
and wellbeing
• Supporting physical health
and wellbeing
• Supporting social and
emotional wellbeing
• Supporting children s
needs
• Maximising learner voice
and participation
• Maximising parent/carer
involvement and
engagement
Priority Area
Them
es
The work of the Service Improvement Plan will be enhanced through a focus on STRATEGIC SUPPORT themes as follows:
• Policies and operating procedures
• Creating inspiring learning environments
• Investing in leadership
• Workforce planning
64

Page 65

6 
Improving outcomes for learners – our stretch aims
Below are the key core outcomes for learners we are working to improve by 2026, based on the most recently available cohort and performance information. 
CORE OUTCOMES
FOR IMPROVEMENT  Performance up to 2023 Stretch Aim 
(by August 2026)
Actual Progress Summary 
(updated annually)
Description of
improvement
Performance
Measure 2019 2020 2021 2022 2023  2024 2025 2026
Core Stretch Aim 1
The proportion of learners in
North Ayrshire who achieve
the expected levels of
attainment in literacy at P1, P4
and P7 will increase.
All learners 74% n/a 59% 67% 68% 75%   
Q1 67% n/a 49% 60% 63% 72%   
Q2-5 79% n/a 67% 74% 74% 80%   
Gap 1 (Q1 vv Q2-5) -12pp n/a -18pp -14pp -11pp -8pp   
Core Stretch Aim 2
The proportion of learners in
North Ayrshire who achieve
the expected levels of
attainment in numeracy at P1,
P4 and P7 will increase.
All learners 79% n/a 67% 75% 76% 81%   
Q1 74% n/a 58% 69% 71% 78%   
Q2-5 84% n/a 75% 81% 80% 86%   
Gap 1 (Q1 vv Q2-5) -10pp n/a -17pp -12pp -9pp -8pp   
Core Stretch Aim 3
The proportion of school
leavers who achieve 1 or more
awards at SCQF level 5 or
better will increase.
All learners 87% 86% 90% 89% n/a 92%   
Q1 80% 79% 83% 82% n/a 89%   
Q2-5 93% 92% 95% 93% n/a 95%   
Gap 1 (Q1 vv Q2-5) -13pp -13pp -12pp -11pp n/a -6pp   
Core Stretch Aim 4
The proportion of school
leavers who achieve 1 or more
passes at SCQF level 6 (grades
A-C) or better will increase. 
All learners 65% 67% 71% 68% n/a 74%   
Q1 52% 55% 61% 56% n/a 62%   
Q2-5 75% 76% 78% 77% n/a 80%   
Gap 1 (Q1 vv Q2-5) -23pp -21pp -17pp -21pp n/a -18pp   
Core Stretch Aim 5
The proportion of 16-19 year-
olds who are participating in
education, employment or
training will increase.
All learners 90.5% 90.6% 90.1% 90.8% 93.9% 95%   
Q1 87.8% 86.9% 85.3% 88.0% 90.6% 92.5%   
Q2-5 92.4% 93.5% 93.9% 93.0% 96.2% 97.5%   
Gap 1 (Q1 vv Q2-5) -4.6pp -6.6pp -8.6pp -5pp -5.6pp -5pp   
Core Stretch Aim 6
School attendance levels will
increase. 
All learners 92.1% 91.6% 91.4% 89.4% 88.8% 93%   
Q1 90.7% 90.1% 89.9% 87.7% 86.7% 92%   
Q2-5 93.2% 92.8% 92.8% 90.8% 90.5% 94%   
Gap 1 (Q1 vv Q2-5) -2.5pp -2.7pp -2.9pp -3.1pp -3.8pp -2pp   
65

Page 66

7 
Below are the additional outcomes for learners we are working to improve by 2026. 
ADDITIONAL
OUTCOMES FOR
IMPROVEMENT 
Performance up to 2023 Stretch Aim 
(by August 2026)
Actual Progress Summary 
(updated annually)
Description of
improvement
Performance
Measure 2019 2020 2021 2022 2023  2024 2025 2026
Additional Stretch Aim 1
The proportion of children
achieving local early learning
milestones by the start of P1
will increase.
All learners 78.2% n/a 72.0% 78.5% 81.4% 83%   
Q1 75.3% n/a 61.8% 75.6% 75.1% 79.5%   
Q2-5 80.7% n/a 80.8% 81.4% 86.8% 86%   
Gap 1 (Q1 vv Q2-5) -5.4pp n/a -19pp -5.8pp -11.7pp -6.5pp   
Additional Stretch Aim 2
The proportion of school
leavers achieving literacy at
SCQF Level 5 or better will
increase.
All learners 83.8% 81.5% 85.0% 83.8% n/a 85.5%   
Q1 75.0% 73.3% 78.7% 76.4% n/a 79%   
Q2-5 90.8% 87.5% 90.0% 89.0% n/a 90.5%   
Gap 1 (Q1 vv Q2-5) -15.8pp -14.2pp -11.3pp -12.6pp n/a -11.5pp   
Additional Stretch Aim 3
The proportion of school
leavers achieving numeracy at
SCQF Level 5 or better will
increase.
All learners 69.3% 70.8% 72.3% 71.4% n/a 74%   
Q1 58.5% 59.3% 64.0% 60.6% n/a 65%   
Q2-5 77.7% 79.1% 78.6% 79.1% n/a 81%   
Gap 1 (Q1 vv Q2-5) -19.1pp -19.8pp -14.6pp -18.5pp n/a -16pp   
Additional Stretch Aim 4
The average “complementary
tariff score” of school leavers’
best five qualifications will
increase. 
All learners 599 643 665 643 n/a 675   
Q1 465 495 539 508 n/a 570   
Q2-5 703 751 765 740 n/a 775   
Gap 1 (Q1 vv Q2-5) -238pts -256pts -226pts -232pts n/a -205pts   
Additional Stretch Aim 5
The proportion of care
experienced school leavers
who achieve 1 or more awards
at SCQF levels 4, 5 and 6 will
increase.
1+ Level 4 or better 84.7% 77.2% 86.1% 90.3% n/a 92.5%   
1+ Level 5 or better 50.6% 53.2% 62.4% 67.7% n/a 69.5%   
1+ Level 6 or better 27.1% 29.1% 40.6% 34.4% n/a 36.5%   
Additional Stretch Aim 6
The proportion of care
experienced school leavers
who achieve literacy and
numeracy qualifications at
SCQF levels 4 and 5 or better
will increase. 
Lit L4 or better 75.5% 74.4% 71.7% 81.6% n/a 84%   
Lit L5 or better 39.6% 53.9% 40.0% 51.0% n/a 55%   
Num L4 or better 64.2% 69.2% 55.0% 79.6% n/a 84%   
Num L5 or better 26.4% 38.5% 33.3% 32.7% n/a 45%   
66

Page 67

8 
APPENDIX: Specific improvement actions for session 2023-24
PRIORITY 1: Improvement in attainment, particularly in literacy and numeracy
Theme 1: High quality learning, teaching and assessment
What we will do What we aim to improve How we will measure success
Develop a partnership approach to our new model of professional learning to
support improved quality of learning and teaching in the classroom, and
include additional investment in high quality professional learning for support
staff and early years practitioners.
Improve consistency and quality of learning,
teaching and assessment across all
establishments. 
Quality of learning, teaching and assessment will be
evaluated as good or better in all establishments. 
(HGIOS 2.3 / HGIOELC 2.3 / QIF / School Reviews)
Extend play pedagogy in the early stages of primary following a review of the
pilot programme and work in partnership to increase outdoor active play in
primary school settings.
Improve the cognitive, physical, social, and
emotional well-being of children, and support the
development of early level skills required for
study, work and relationships.
The proportion of children achieving NAC early
learning milestones by the end of ELC and early level
by the end of P1 will increase. 
(Milestones data / ACEL / stretch aim)
Review, update and implement authority-wide frameworks for learning to
support high quality learning and teaching across all schools and EYCs –
including: Literacy; Outdoor learning/STEM; Early learning; Health & Wellbeing
Improve consistency of quality and build on and
extend existing good practice. 
Quality of learning, teaching and assessment will be
evaluated as good or better in all establishments.
(HGIOS 2.3 / HGIOELC 2.3 / QIF / School Reviews)
Support establishments to achieve Digital Schools status, ensuring that digital
technologies are a central component of our approaches to quality learning
and teaching. 
Improve the effective use of digital technologies
to enhance learning in all establishments. 
The number of schools achieving Digital Schools status
will increase. (Digital Schools award / QIF / HGIOS 2.3, 3.3
HGIOELC 2.3, 3.3)
Theme 2: Raising attainment and achievement
What we will do What we aim to improve How we will measure success
Further enhance approaches to supporting and challenging schools/EYCs to
make effective use of performance data to plan for further improvements in
attainment. This will be supported through the development of new data
visualisation resources.
Improve learner attainment and achievement at
all levels.
Raising attainment and achievement will be evaluated
as good or better in all establishments. (HGIOS 3.2
HGIOELC 3.2 / QIF)
The percentage of children and young people
achieving the expected Curriculum for Excellence
levels will increase (ACEL data) (stretch aims)
The percentage of school leavers achieving literacy
and numeracy qualifications will increase. (Insight
national benchmarks L4,5,6)
The overall levels of achievement of school leavers will
increase. (Insight attainment for all 20/60/20
Implement further target setting arrangements to raise attainment and
achievement for all
Improve the quality of monitoring progress in
learning and the effective use of targeted
interventions.
Support primary schools to raise attainment in literacy through evidence-based
improvement approaches to developing aspects of listening and talking skills in
the early stages of primary and writing in the middle stages of primary.
Improve attainment levels in specific focus areas
of literacy across a range of establishments. 
67

Page 68

9 
PRIORITY 2: Closing the attainment gap between the most and least disadvantaged children and young
people
Theme 1: Interventions to reduce gaps
What we will do What we aim to improve How we will measure success
Increase coherence between SEF and PEF interventions and support
schools to improve the impact of PEF investments on target groups of
learners.
Improve the effectiveness of targeted
interventions in reducing the attainment gap.
The gap between the achievement levels of the most
and least disadvantaged learners will reduce. 
(ACEL data / Insight attainment vv deprivation) (stretch aims)
With a specific focus on early learning, enhance the work of our
Excellence and Equity Leads team to support the further reduction of
the poverty-related achievement gap.
Improve early years outcomes for all children,
particularly those most disadvantaged.
The gap between the early learning milestones data of
the most and least disadvantaged learners will reduce.
(Milestones Data) (stretch aims)
Continue to work closely across North Ayrshire services and third sector
partners to reduce the cost of the school day and mitigate the impact of
child poverty.
Improve the extent to which our schools and
Early Years centres can mitigate the impact of
child poverty.
The number of schools demonstrating a poverty aware
approach to mitigating the impact of child poverty will
increase. (QIF / COSD Toolkit evaluative framework) 
Theme 2: Specific focus on identified target groups, including care experienced learners
What we will do What we aim to improve How we will measure success
Continue to implement the strategic actions of the Promise, through: 
• further enhancing supports for care experienced children and
young people, including mentoring services, that enable them
to attain and achieve in line with their peers. 
• expanding MCR Pathways programme to involve all mainland
secondary schools.
Improve the attendance, engagement and
achievement of care experienced children and
young people.
Attendance levels will improve and exclusion levels
will reduce for all care experienced learners. (Seemis
attendance/exclusion data)
Achievement levels will improve for care experienced
learners. (ACEL data / Insight average complementary tariff
scores)
The gap specifically between the achievement levels
of care experienced learners and all other learners will
reduce. (Milestone Data / ACEL data / Insight average
complementary tariff scores) 
68

Page 69

10 
PRIORITY 3: Improvement in skills and sustained, positive school-leaver destinations for all young people
Theme 1: Improved skills
What we will do What we aim to improve How we will measure success
Commence a review of the curriculum across secondary schools. Improve the shared understanding of the purpose
and design of the curriculum in order to increase
opportunities to maximise the successes and
achievements of all our learners.
The number and quality of successful student
presentations across all SCQF qualifications will
increase.
(Insight breadth and depth / Insight average complementary tariff
scores)
Increase direct links within the curriculum to the Ayrshire Growth Deal and
design further opportunities for skills development in a range of contexts.
Improve the articulation between curriculum and
skills development through an increased
knowledge and understanding of the Ayrshire
Growth Deal. 
The number of secondary schools engaging with
Ayrshire College Innovation Bursts will increase.
(College participation data)
The senior phase curriculum offer will be broadened
to recognise the 5 key programmes within the
Ayrshire Growth Deal: 
Aerospace and Space / Communities / Economic
Infrastructure / Energy, Circular Economy, and
Environment / Tourism
(Qualifications data)
Theme 2: Partnerships to improve learner outcomes post-school
What we will do What we aim to improve How we will measure success
Through DYW co-ordinators and other partners, embed approaches to
planning, supporting and tracking post-school destinations for all school
leavers.
Improve the levels of sustained positive
destinations for our young people.
The proportion of young people entering and
sustaining positive destinations will increase.
(Insight positive destinations data)
Strengthen partnership work with the NAC Local Employability Partnership,
Skills Development Scotland and Ayrshire college to support sustained, positive
participation in education, training or work for all young people up to the age
of 19.
Improve participation levels for all young people
up to the age of 19, through enhanced
partnership working.
The proportion of young people positively
participating in education, training or work will
increase.
(Annual Participation Measure) 
69

Page 70

11 
PRIORITY 4: Improvement in children and young people’s health and wellbeing
Theme 1: Supporting mental health and wellbeing
What we will do What we aim to improve How we will measure success
Implement and evaluate the revised school counselling service across
all schools.
Improve the targeting of the counselling resource
to support the mental health & wellbeing needs
of identified learners. 
Children/young people will report increased
engagement, satisfaction, and improved wellbeing
following counselling and access to other wellbeing
supports (CORE / SDQ /  crisis counselling measures)
Continue to embed whole school approaches to supporting children’s
mental health and wellbeing, ensuring integration with community
mental health and wellbeing approaches.
Improve early access for children and families to
a wide range of high quality universal and
targeted activities that will support positive
mental health and wellbeing.
An increased number of children/young people will
report having their mental health and wellbeing needs
met. (Pupil Focus Groups, PASS, LIAM Measures, CYP CMHWB
Supports and Services Reporting and Evaluations)
Support establishments to develop evidence-based staff wellbeing
approaches around the key themes of autonomy, agency and affiliation
for staff.
Improve the range of supports available to staff
to support their mental health and wellbeing.
The proportion of staff reporting concerns about their
mental health and wellbeing will decrease. (OH reports /
staff absence data / staff survey)
Theme 2: Supporting social and emotional wellbeing
What we will do What we aim to improve How we will measure success
Establish whole school nurturing approaches in all establishments,
including the designation of whole school nurture leads, the
implementation of a comprehensive training programme for staff and
the establishment of  benchmarks to support self-evaluation and
consistency of practice.
Improve the consistency of pupil experience
of whole school nurturing approaches
through the increased staff knowledge and
application of these approaches in practice.
Staff knowledge and confidence in applying
whole school nurture and relationship based
approaches will improve and pupil outcomes will
improve.
(Nurture staff survey / QIF /QI3.1 evaluations / SDQ / Exclusion data)
Theme 3: Improving attendance
What we will do What we aim to improve How we will measure success
Develop further universal supports to ensure improved school
attendance for all, including updated processes and guidance
Improve attendance through enhanced
approaches to monitoring and the creation of
agreed interventions to maximise engagement.
Attendance levels will improve, late coming will
reduce and exclusion levels will reduce for all learners.
(Seemis attendance/exclusion data / PASS data)
Develop targeted approaches to support improved school attendance
for individuals and identified groups of children and young people,
including care experienced learners.
Improve access to an increased range of
approaches and services to support better
attendance. 
Attendance levels will improve, late coming will
reduce and exclusion levels will reduce for specific
groups of learners, including those with attendance of
below 50% / between 80-90%. 
(Seemis attendance/exclusion data / PASS data)
70

Page 71

12 
PRIORITY 5: Placing human rights and needs of every child and young person at the centre of education
Theme 1: Supporting needs
What we will do What we aim to improve How we will measure success
Implement the recommendations of the Supporting Needs review
including the review of governance, processes and practices to support
placements, and the revised Staged Intervention policy.
Improve systems and processes governing the
provision of support to learners.
Staff evaluations will demonstrate shared understanding
of the approach to planning support in establishments.
(QIF / surveys)
The quality of information in referrals will be improved.
The number of referrals to the Inclusion Group will
reduce. Timescales between initial referral and provision
of support will be reduced. (IG data)
Working in partnership with other services, engage with children, young
people and their families to collaborate and co-create a communication
strategy around how needs are supported in North Ayrshire.
Improve understanding among all stakeholders
of the range of support available and ways to
access support.
Stakeholder evaluations will demonstrate improved
knowledge and increased satisfaction. (Focus groups /
surveys)
Review support services and teams, including outreach services, classroom
assistants and teaching support, and enhance professional learning
programmes.
Improve the quality, interconnectedness and
flexibility of the support resources available to
support learners’ needs.
Learner outcomes data will improve (attainment data /
stretch aims / wellbeing data)
Staff evaluations will demonstrate improved skills.
Refresh and redesign advice and guidance around best practice in curriculum
approaches which offer flexible learning experiences for young people.
Improve the flexibility of the secondary school
curriculum shaped around learner needs.
The number of requests for external curricular
provision will reduce. (IG data)
Theme 2: Maximising learner participation and voice
What we will do What we aim to improve How we will measure success
Complete and implement a new Learner Participation Policy and
increase opportunities for children and young people to play a
meaningful role in shaping education and Council policy and practice.
Improve learner participation and voice in the
four arenas of participation.
Learners will participate more meaningfully in all areas
of school life. (QIF / HGIOURS)
Theme 3: Maximising parent/carer involvement and engagement
What we will do What we aim to improve How we will measure success
Implement locally the revised ‘Learning Together’ Scottish Government
parental involvement and engagement action plan and use the
Strategic Framework for Parental Involvement, Parental Engagement,
Family Learning and Learning at home to evaluate and plan for next
steps at school and authority level.
Improve the range and quality of opportunities
for parental engagement and involvement.
Parent/carer evaluations of their opportunities for
involvement in decision making at school level will
increase. (PIE survey / HGIOS 2.7 / HGIOURS 2.7)
Evaluation and feedback from families and schools on
a range of aspects of family learning will improve. (FL
data / school impact reports) 
71

Page 72

13 
STRATEGIC
SUPPORT
Ensuring excellent educational experiences
Theme 1: Policies and Operating Procedures
What we will do What we aim to improve How we will measure success
Continue the programme to replace Standard Circulars with new Policies and
Operating Procedures.
Improve clarity of policy and consistency of
implementation across establishments, leading
to improved outcomes for schools and their
children / young people.
Policy and practice inconsistencies will reduce. (QIF /
complaint records)
Satisfaction levels will increase. (Annual stakeholder
surveys) 
Theme 2: Creating inspiring learning environments
What we will do What we aim to improve How we will measure success
Ensure the efficient and effective delivery of the learning estate in terms of
condition, suitability and sufficiency through the delivery of key projects,
including: Marress House Early Learning Centre; replacement Moorpark
Primary School; Ardrossan Community Campus; New Primary School for Irvine
East (Montgomerie Park); expansion of dining facilities at West Kilbride PS,
Glebe PS, Loudoun-Montgomery PS. 
Improve learning environments to ensure we:
provide creative and engaging lifelong learning
and teaching opportunities; are environmentally
efficient; are digitally enabled; and meet the
needs of all current and future learners within
North Ayrshire
The strategic objectives of each project will be met. 
(Project objective measures / stakeholder evaluation) 
Theme 3: Investing in leadership
What we will do What we aim to improve How we will measure success
Design programmes to support the professional development of our staff –
including phase 2 of the New Heads Induction Programme, the embedding of
the DHT professional learning networks, and the partnership delivery of the
SWEIC leadership development programme. 
Improve the professional learning offer and
leadership development pipeline for leaders at a
range of levels across the system, leading to
strengthened leadership of our establishments.
The number of participants in masters level learning
will increase. The quality of leadership in our
establishments will be further enhanced.
(Into Headship participants / QI 1.3 evaluations / applicants for
leadership posts)
Theme 4: Workforce Planning
What we will do What we aim to improve How we will measure success
Support service redesign across various education teams to ensure the
efficient and effective deployment of resource to deliver high quality service.
Improve the service redesign process through
enhanced understanding of the service objective,
people and financial implications of proposals.  
Service objectives will continue to be met successfully
within the policy and financial context.
(Budget monitoring / service self-evaluation / workforce planning
data)
72

Page 73

14 73

Page 74

15  74

Page 75

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Proposals for Community Investment Fund (CIF)
Expenditure 
Purpose:  To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects. 
Recommendation:  That Cabinet: 
a) Reviews the enclosed application from the Irvine Locality
Partnership; and
b) Approves the CIF application in relation to CHAP,
including the conditions approved by the Locality
Partnership 
1. Executive Summary 
1.1 1.1 Within its budget for 2017-18, North Ayrshire Council provided a funding
allocation for the creation of an innovative fund to enable communities to address the
priorities they have identified through Locality Planning Partnerships and within the
context of North Ayrshire Community Planning Partnerships Fair for All Strategy and
the Council’s Community Wealth Building Strategy.  In June 2021, Cabinet approved
a further £1m top-up for the funding, with a further £2m added in November 2021. 
1.2 Locality Partnerships have subsequently continued to work on their local action plans
and are refining proposals for expenditure in line with their locally identified needs.
This is a difficult process, and it is a testament to the dedication of the Locality
Partnerships and their community partners that proposals are now emerging to
provide creative approaches to addressing local challenges. 
1.3 This report brings forward proposals which respond to the specific need of the local
community, and which have been developed based on local circumstances and
opportunities. 
1.4 These proposals have been approved to be submitted to Cabinet through a process
of collaboration and consensus by the Locality Partnerships. 
Agenda Item 6
75

Page 76

2. Background 
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they
have identified though Locality Planning Partnerships and within the context of North
Ayrshire Community Planning Partnership’s Fair for All Strategy and the Council’s
Community Wealth Building Strategy. A further £3m was added to the funding in 2021,
to be distributed among Localities as follows: 
2.2 It was agreed that the CIF awards range between £5,000 and £100,000 for the
community organisations, as defined in the CIF guidance, in order to support
proposals and projects that connect with: 
• The North Ayrshire Fair for All Strategy, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and Locality priorities; 
• North Ayrshire Council’s values, priorities, and business objectives;
• The Community Wealth Building and Environmental Sustainability and Climate
Change Strategies; 
And will also: 
• Fulfil a compelling need and not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in
their way of addressing community challenges and in their request to Locality
Partnerships and the Council;
Locality Value of CIF
from first
funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from second
funding
allocation (June
2021)
Value of CIF
from third
funding
allocation (Nov
2021)
Total balance
available
Irvine £754 000 £558, 435 £290 000 £580 000 £1 065 565
Kilwinning £286 000 £322 190 £120 000 £240 000 £323 810
Three Towns £598 000 £907 573  £240 000 £480 000 £410,427
Garnock
Valley
£390 000 £341 805 £150 000 £300 000 £498 195
North Coast £468 000 £429 066 £170 000 £340 000 £548 934
Arran £104 000 £125 079 £30 000 £60 000 £68 921
TOTAL £2 600 000 £2 684 148 £1 000 000 £2 000 000 £2 915 852
76

Page 77

• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
2.3  The proposal development and application process has been agreed as follows: 
• Locality Partnerships should continue to engage with their communities and stimulate
interest in the CIF. Each Locality Partnership will then strategically assess the
applications, make links, and look at the funding ‘in the round.’
• If the partnership supports a bid then the group will be encouraged to submit a full
application form, which they will decide upon before making a proposal to Cabinet for
final approval. 
• The proposal will go to the next suitable Cabinet for final approval. 
2.4 The enclosed applications have been developed by community partners and North
Ayrshire Council officers and are now recommended for approval by Cabinet. The
proposals are as follows: 
2.5 The Irvine Locality Partnership 
The allocations and funds committed to date are outlined in the table below. 
The Irvine Locality Partnership CIF allocation to date:  £1,624,000
Irvine Digital Officer   £84,604
Vineburgh & Fullarton Community Enablers  £100,000 
Irvine New Town Mens Shed   £10,000 
Irvine Harbourside Mens Shed   £10,000 
Irvine Youth Hub   £100,000 
Irvine Tennis Club  £100,000 
INPUT   £60,000 
Children's 1st   £97,580 
Balance  £1,065,565 
2.6 Proposal: CHAP (£91,534) (See Appendix 1) 
2.6.1 CHAP is a non-profit, private company limited by guarantee, and a registered charity
which was established in 2000. Their mission is to ensure people are not
disadvantaged through a lack of awareness of, access to, and information regarding
their welfare rights. 
2.6.2.The project which has been proposed will deliver CHAP services by establishing new
advice worker outreach within local community settings throughout the Irvine area.
The funding will allow for two full time advice workers to be employed for a year, and
that these welfare advice posts will not duplicate any existing provision.  Making these
services accessible locally, in established and trusted environments, means that
people will be able to gain assistance with a variety of benefits, housing, and debt
77

Page 78

issues on their doorstep. This is a model which has already proven successful in
Kilwinning, Kilbirnie and the Three Towns areas. 
2.6.3 The application supports the Irvine Locality Partnership priorities of Employment and
Economy, Mental Health and Influence and Sense of Control. The full application is
attached as Appendix 1 for consideration. 
2.6.4.Irvine Locality Partnership has approved the application with the following conditions: 
a) The two posts for which funding is requested must be advertised and be two new
positions and not a continuation of positions already held by the organisation.
b) A quarterly report should be submitted to the Irvine Locality Partnership with updates
on where in Irvine will the positions be based. 
Cabinet is asked to agree to the conditions if approval is granted for the application. 
3. Proposals 
3.1 That Cabinet: 
a) Reviews the enclosed application from the Irvine Locality Partnership in line with CIF
criteria; and
b) Approves the CIF application in relation to CHAP, including the conditions approved
by the Locality Partnership. 
4. Implications/Socio-economic Duty 
Financial 
4.1 CIF Funding is allocated within existing resources. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community
cohesion and advance community empowerment. Each of the CIF proposals is tested
against that purpose before being presented to Cabinet. 
Climate Change and Carbon 
4.5 Environmental and sustainability along with Climate Change and Carbon issues are
considered in relation to each CIF application. 
78

Page 79

Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
strategic aims: 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience
for local people
• We will have active, inclusive and resilient communities
• To achieve net-zero
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 The applications support the following pillars of community wealth building: 
• Advancing community enterprises;
• Advancing local ownership of underused land and buildings;
• Making financial power work for local places; and 
• Supporting local business activities and increasing the variety of ownership models. 
5. Consultation 
5.1 The proposals contained within this report have been developed by the Locality  
Partnership, through consultation with local people, including young people. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on (01294) 324415. 
Background Papers
Appendix 1: CIF Application - CHAP
79

Page 80

Community Investment Fund Application Form: Irvine Locality 
The CIF will support proposals and projects that: 
• Connect with:
o The North Ayrshire Fair for All Inequalities Strategy.
o the Community Planning Partnership and Locality priorities; and 
o North Ayrshire Council’s values, priorities, and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities.
• Provide long-term, sustainable, positive results for the greatest number of people possible.
• Exhibit project and/or organisational innovation in their approaches to their work in their way of addressing
community challenges and in their request to Locality Partnerships and the Council.
• Come from (an) organisation(s) that is financially viable (can provide financial statements upon request) and
efficiently and effectively managed. This can include an organisation to be created to deliver the project.
• Include options or potential for NAC and CPP employee engagement and volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities and stimulate interest in the CIF.  The Locality
Partnership will then strategically assess the applications, make links, and look at the funding ‘in the round’. 
• If the partnership supports a bid then the group will be encouraged to submit a full application form, which
they will decide upon before making a proposal to Cabinet for final approval. 
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Co-ordinator, by email if possible: 
Elaine Baxter
Irvine Locality Coordinator
Economy and Communities
Community Development Team
Redburn Community Centre
Dickson Drive
Irvine
KA12 9EW 
Email: ebaxter@north-ayrshire.gov.uk
Tel: 01294 313593
Mob: 07814418453 
Support and information will be available for groups who are not successful. For more information see the
guidance form here: http://www.northayrshire.community/wp-content/uploads/sites/60/2018/06/community-
investment-fund-guidance-notes-17-12-17.pdf 
80

Page 81

APPLICATION FOR FINANCIAL ASSISTANCE
Community Investment Fund
2. Brief description of your organisation
Please include -
[a] Legal status, e.g., voluntary organisation, public/private limited by shares or guarantee. 
[b] How long has organisation been in existence?
[c] Aims & objectives. 
[d] General activities or services provided. 
CHAP is a non-profit, private company limited by guarantee (company number SC213344), and a registered charity
(charity number SC028100) which was established in 2000. Initially established and managed by a small group of
volunteers to deliver housing advocacy, it was identified that housing is very rarely a stand-alone issue, and
individuals usually experienced other benefit-related issues, and were facing various debts. Therefore, CHAP has
developed services over the past 23 years to adapt to the ever-changing needs of the residents of North Ayrshire.
This has taken into account various socio-economic events such as the economic recession, Covid-19, and the
current ongoing cost-of-living crisis. The organisation is governed by a Board of six voluntary trustees with various
managerial backgrounds. 
Our mission is simple, yet far-reaching – we exist to ensure people are not disadvantaged through a lack of
awareness of, access to, and information regarding their rights. We are a positive and helpful influence providing
support and hope to individuals facing housing, welfare rights, and debt issues, standing alongside our clients as
they face some of life’s most difficult challenges. 
All the services provided by CHAP have in common an ethos which supports social inclusion and justice for all.
CHAP provides support to individuals who are most in need to receive much needed information and assistance to
address issues that affect their everyday lives. Our service empowers individuals to have their views and opinions
heard by the decision-makers and overcome barriers of literacy and communication challenges. 
We provide education and advice to individuals through an early intervention and prevention approach, breaking
the cycle of exclusion, and helping them to avoid financial difficulties in the future. This covers areas such as
income maximisation, budgeting, responsible borrowing, using credit unions to save, etc…which will in turn instil
good practice and give individuals the financial literacy and resilience needed, empowering them to make sound
financial decisions and avoid problem debt. Where clients do present with issues which have already reached a
stage which is causing stress, CHAP can assist by providing real, practical steps that can be taken to obtain better
outcomes.
1. Details of your organisation 
Name of Organisation:  Community Housing Advocacy Project (CHAP)
Postal Address for 
Correspondence: Michael Lynch Centre for Enterprise, 
71, Princes Street 
Ardrossan 
KA22 8DG
Name of Contact Person:  Debbie Alexander
Position in Organisation:   Chief Executive Officer
Contact Telephone Number:  
E mail address                                 
81

Page 82

Anything can happen to anyone, at any time. People can suddenly find themselves in a vulnerable situation and
may not know where to turn. By accessing the CIF funding, CHAP wants to make our advice and advocacy services
more readily accessible throughout the Irvine area, and in turn help as many people as possible by assisting people
to build their own financial knowledge, capability, and resilience, this will help them to avoid getting into financial
difficulty in the future, and in turn, avoid these issues having a negative impact on their quality of life. 
In the last year (ending March 2023), we helped 858 clients, as well as their families with a variety of debt, housing,
and welfare rights issues. One of the main services we provide, is ensuring that our clients have access to the
maximum amount of income they are entitled to. A report carried out by entitledto.co.uk showed that an
estimated £15 billion in benefits goes unclaimed annually due to people being unaware of their benefit entitlement
and being unfamiliar with the benefit system. By assisting with benefit applications, and challenging decisions on
our clients’ behalf where required, we help to ensure that people are able to access the appropriate benefits. We
also ensure that when a client does not receive a favourable decision, they have the opportunity to challenge these
decisions, by submitting a reconsideration/redetermination on their behalf, and providing representation at First
Tier Tribunals when required to ensure the client’s voice is heard in relation to their case. 
In the year April 2022 – March 2023, CHAP has achieved over £2.3m in financial gains for our clients. This has been
in relation to successful benefit applications, included backdated payments, debt write-offs, sequestration
(bankruptcy), and hardship payments. By helping people to maximise their income; therefore, having more money
in their pockets, this not only helps the person and their families directly, but it also helps to boost the local
economy, and also provides people with more options and dignity in life. Not only do we help to improve
individual’s financial circumstances, but assistance provided also has a fundamental impact on other areas of their
life. We have a thorough evaluation practice in place which captures the impact that our services have on our
clients’ lives. In the last year, the following improvements have been made to our clients’ lives after their engaging
with CHAP:
• 84% said that they have experienced a reduction in stress.
• 73% said that we helped to improve their finances.
• 54% said that we assisted to improve their quality of life.
• 46% said that we helped to increase their confidence. 
3. Title and summary of proposal
Tell us a bit about your idea. Please describe in as much detail as possible, what the funding 
will be used for. Please include where it will be held / delivered, who is your target audience, 
who will benefit from it and how and indicate any partners that are involved. 
Please include -  
[a] What outcomes your organisation wishes to achieve. 
[b] Is this a new service / project?
[c] Does a new organisation need to be set up? 
CHAP Advice Outreach 
CHAP believes that advice services should be available and accessible to everyone in the community, and therefore
wants to remove any barriers that may prevent individuals from reaching out for help. The project we are
proposing is an extension of the existing CHAP services, to establish new outposts within local community settings
throughout the Irvine area. If successful, the funding from CIF will allow for advice workers to be based within
various community locations throughout Irvine. Making our services accessible locally, in established and trusted
environments, means that people will be able to gain assistance with a variety of benefits, housing, and debt issues
on their doorstep. This will mean they do not need to travel all the way to Ardrossan to access our services;
therefore, removing any accessibility barriers. By delivering our services from these kinds of premises, which
already have a lot of activities happening on a daily basis, this means that people could be attending for any
number of reasons; therefore, avoiding the stigma that might be attached to attending the main CHAP office.  
This funding will further increase our capacity to see clients, reducing waiting times, and providing our services to
people within their own communities. The proposed service will be delivered over and above the existing services
that we are delivering, both from our main office in Ardrossan and via our other, existing community outreach
facilities, giving people more access to advice services which are needed now more than ever. Better Off North
82

Page 83

Ayrshire is ending in June 2023, with a contract then being put in place for debt advice across North Ayrshire. The
funding from CIF will allow us the opportunity to expand resources to establish more outreach opportunities,
specifically within the Irvine area, and will include up to Type III advice and advocacy in relation to Welfare Rights,
and Housing as well as Debt where appropriate. 
Since April 2022, 38% of clients referred to our services from the Irvine area have failed to engage/attend their
appointment. We know that there is a further need for our services in the Irvine area, and by bringing CHAP
services to where people are, closer to their home, we are confident that the engagement would increase to
ensure that people are gaining the support they need. Since we launched our Kilwinning outreach service in March
2022, we experienced a 110% increase in the number of clients from Kilwinning who engaged with our service,
compared with the previous year. This means that those who would never have accessed our services were able to
gain assistance with the issues which were negatively impacting various areas of their life, especially their mental
health. 
We often find that due to the stigma that unfortunately remains attached to reaching out for assistance, especially
in relation to money and debt issues, people are more likely to engage with our services if they are anonymised –
by accessing assistance in busy and established community facilities, it is not automatically assumed that someone
would be going there for help with money-related issues, as they could be accessing the premises for various
reasons. 
The impact of the cost-of-living crisis is having an affect on everyone. We are seeing an increasing number of clients
who now require our services, who never would have previously. Individuals who have never faced financial
difficulties are now finding that their finances are being stretched to an unmanageable degree: mortgage and rent
rates are increasing, along with the cost of everything else – gas/electricity, petrol/diesel, food, and household
essentials. With so much strain being put on family budgets, along with the demands of every-day life, this can
culminate in financial crisis. People may feel forced into accessing unaffordable credit, leading to further financial
distress. CHAP strongly believes that education, early intervention, and prevention are key; and can offer this as
part of a two-tonged approach along with crisis intervention when required. 
Whilst engaging with the community, and working with other services, we have often heard people lament ‘if only I
had known about CHAP…’ during a difficult time in their lives, it would made things a lot easier to cope with. We
never want people to feel this way. We want everyone in Irvine to know that we are there, within their local
communities to support them, so that nobody ever needs to experience that feeling of needing help, and not
knowing where to turn. By providing our services on an outreach basis, this will increase the number of people who
hear about CHAP within their local communities, which could provide that lifeline that someone is searching for. 
4. What difference will this project make within the locality and to local services and programmes? 
Please include -   
[a] How you will approach reducing inequality.
[b] How this proposal fits with Irvine’s priorities of:
1. Employment and Economy
2. Mental Health
3. Traffic and Parking
4. Influence and Sense of Control 
Outcomes
• Increased number of individuals provided with easy/affordable access to services from the Irvine area.
• Increased number of people with improved financial management skills.
• Increased confidence and overall better quality of life reported by individuals.
• Increase in household finances through income maximisation.
• Reduction in reported stress levels.
• Improved mental health and wellbeing.
• Improved local economy as households will have more money to spend.
• Reduction in levels of debt. 
83

Page 84

Irvine has an average child poverty rate of around 23% (2020 SIMD), and this ranges from the highest level of
44.87% down to the lowest level of 7.11%. This demonstrates the huge disparity that exists between residents in
different areas of Irvine. This is true, even when comparing areas within the same locality, e.g., within one
locality/community, there are streets that have the average child poverty area of 44.87%, compared to adjacent
communities which have levels of 9.38% and 7.11%. Throughout Irvine, there are communities where the child
poverty levels are consistently high, e.g., in Bourtreehill, Irvine Central, and Fullarton. 
These levels of child poverty and disparity have real negative impact on the mental health of those at the higher
ends of the child poverty scale. Dealing with debt, housing, and benefit issues also has a negative effect on peoples’
mental health. When all these aspects are compounded, it can make life extremely difficult for individuals, and can
also have a detrimental impact on the family as a whole. 
When comparing the unemployment levels within the same areas, there is often a clear correlation between this
and levels of child poverty. People who are unemployed and facing rising debts, often feel like these issues are
unsurmountable. Many are afraid to take positive steps back into employment because they know that when they
do, it means that creditors will be able to take action against them to recuperate debt. By engaging with CHAP’s
advisers in a trusted environment, clients can begin to remove these barriers by gaining timely and appropriate
advice, which can then begin to improve their confidence, remove stress, and allow them to start thinking about
making positive steps towards employment. 
According to entitledto.org.uk, there was over £15 billion unclaimed benefits in 2020. This includes: 
• Child tax credit - £2.49 billion (£3716 per year for each family missing out)
• Pension credit - £1.56 billion (£1695 per year for each individual missing out)
• Council Tax Support - £2.6 billion (£938 per year for each household missing out)
• Housing Benefit - £2.81 billion (£3122 per year for each household missing out) 
These figures demonstrate that services which can help to maximise people’s income and put money directly into
the pockets of individuals and their families are needed now more than ever. Since May 2022, CHAP has achieved
almost £2.3 million in financial gains for our clients, of which over £368,000 was for individuals from Irvine. This
could be further increased by us having a presence within local communities in the area, as it will allow us to reach
disengaged individuals with various accessibility challenges. 
CHAP is assisting to increase the income of individuals and families throughout Irvine, which not only has a positive
impact on the people themselves; it also has a larger benefit to community regeneration. If local people have more
money coming into their households, this will enable them to spend more money locally, support local business,
boost the economy, and improve their overall mental health and wellbeing. Improving people’s wellbeing and
confidence, as well as reducing their stress levels will allow them to move forward in their lives in relation to
possible employment or training opportunities, which has a long-term positive affect on their lives. 
We have successfully rolled out several outreach facilities in Kilwinning, Kilbirnie, and throughout the Three Towns,
which has revealed the full extent of unfulfilled demand for our services, previously not met through issues of
accessibility and stigma with people accessing our services within their communities. The CIF funding will allow us
to replicate this model in the Irvine area, ensuring the residents have the same access to CHAP services as their
counterparts in other areas of North Ayrshire. 
The cost-of-living crisis has meant CHAP has already experienced an increase to the demand on our services. In our
operational year ending November 2022, we witnessed a 30% increase in referrals to our service, compared to the
previous year. Without further funding this increase has the adverse effect of lengthening lead times to first
appointment. This in turn leads to despair and to many clients failing to engage with us, something which can only
worsen through the continuing cost-of-living crisis. There had previously been levels of financial support put in
place by both the UK, and Scottish Governments; however, these support measures are no longer in place, and as
such we are anticipating further demands on our services in the months to come. 
CHAP advice services will compliment all the community work that is already taking place within the Irvine area.
There are various community groups and organisations who are working hard to help people through the current
financial crisis, including food provision services, Friends of Redburn, Fullarton Community Hub, as well as various
services relating to mental health and wellbeing. CHAP will work in partnership with established community
84

Page 85

organisations to ensure that all aspects of peoples lives are addressed, and support is put in place where
appropriate. 
5. Please give an overview of the engagement that has taken place in relation to the project 
With support from the Locality team, we conducted an online survey of community members, and of those who
responded, 91% have indicated that they would be more likely to access advice services within a community setting
rather than in a traditional office setting. This demonstrates that people are still worried about the stigma that
surrounds accessing advice services, and that individuals would rather be seen within a trusted, familiar, and
informal setting, which can be the difference between engaging and gaining help, and the individual struggling with
issues alone, which often has a long-term negative impact on mental health, and overall wellbeing of individuals
and families. 
We have been involved in ongoing community engagement in relation to this proposal. This has included
attendance at various community ‘Chit Chat’ sessions, as well as the locality networking events. Through attending
these sessions and speaking to members of the community, we have heard from various individuals that the
provision of advice services within the community are lacking, and a lot of people do not know where to turn to for
support. 
When asked if they are worried about the current cost-of-living crisis, 91% also indicated that this is an area of
concern for them. Finally, when asked where the best place for would be for advice services to be delivered within
the community, the responses were based around community centres, and libraries. 
6. Please tell us how the project will be managed 
Please include -  
[a] How the finances will be managed. 
[b] Does the proposed project contribute to volunteering or employment opportunities in Irvine? Please include the
number of volunteering opportunities and employment opportunities
[c] If there are any staff requirements, please outline your HR plans.
[d] Is there evidence of partnership working in relation to the project within Irvine locality? 
Staff are responsible to the Service Manager and the Key Performance Indicators (KPI’s) are cascaded into staff
action plans which in turn, influence personal training plans.  The Service Manager reports on KPI’s to the CEO on a
regular basis, who is required to report to the Board of Directors on a quarterly basis on the outcomes achieved
across the services.  There is also a Service Support Officer who oversees the setup of new initiatives, reporting and
quality assurance. 
To successfully deliver the proposed project, CHAP has plans in place to expand our current resources if we are
successful in obtaining the required funding. The staff induction and training process is aligned with the Scottish
National Standards and Financial Conduct Authority requirements.  There are ongoing training procedures in place,
with staff having dedicated training time incorporated into their working schedule. Each staff member has an
individual training plan which highlights any skills gaps and to allow appropriate training to be sourced to assist them
to develop the required technical knowledge. Staff are cross trained to maximise overall staff efficiency and flexibility,
reducing the potential impact of a key member of staff being absent or leaving the organisation.   
Our accounts are outsourced to an external company, Alexander Sloans. We have external Finance Director who is
able to provide us with detailed accounts at individual project level. The management accounts produced are
reviewed quarterly by the board and annually by our auditors. 
Procedures are in place to ensure that all elements of the services remain inside the allotted budgets.  The Chief
Executive and the Virtual Finance Director liaise with each other, regularly discussing said budgets. Each service has
its own individual budget sheet, and each budget heading is broken down monthly. The Chief Executive is
responsible for ensuring that there is enough in the budget to cover any requests, such as staff training, etc.  All
company transactions are recorded by our Virtual Finance Director and a financial trail is kept for end of financial
year auditing.  Detailed quarterly management accounts are provided to the Board of Directors for scrutiny. 
85

Page 86

Other than the board of directors who are volunteers, CHAP currently does not have volunteers involved in the
delivery of services. However, this is something we are looking to develop, and we would welcome the support of
volunteers in our community based work in the role of ‘peer supporters’. 
We have established excellent partnerships with the Irvine Locality Team which has allowed us to gain an
understanding of the needs of the residents within the Irvine area, and the issues that are affecting people locally.
We have excellent partnerships with Children 1st, KA Leisure, Input, and various community centres throughout the
Irvine area. We work closely with the Third Sector Interface to help establish other potential partnerships with like-
minded organisations. 
7. Amount of funding being requested 
Please supply details of the amount of funding being requested and any other funding you have had over the past 5
years, both financially and ‘in kind’. 
Amount of funding requested: £91,534 
Please include detail on -  
[a] Breakdown of costs if available. 
[b] Recent quotations where appropriate
When Funder Project Amount
2017-2020 North Ayrshire Council
Better Off North Ayrshire - Digital
Access £904,938
2017/18 North Ayrshire Council
Better Off North Ayrshire – Shared
Tenancy £2,572
2017/18 North Ayrshire Council Modern Apprenticeship Scheme £2,838
2017-2022 North Ayrshire Council Housing Advice Service £511,146
2017-2022 East Ayrshire Council Rent Deposit Scheme £285,303
2017-2022 Scottish Legal Aid Board
Ayrshire Homelessness And
Prevention £638,857
2017-2022 Scottish Legal Aid Board Money Advice Project £380,784
2017-2020 SCVO Community Jobs Scotland £28,818
2018/19 Nationwide Community Awards £44,635
2019/20 SCVO Wellbeing Fund £14,224
2019/20 Scottish Government Benefit Uptake Fund £16,411
2019/20 Scottish Government Supporting Communities £15,220
2020/21 SVCO Employment Initiative £2,410
2020/21 North Ayrshire Council Housing + Money Advice £94,664
2020/21 North Ayrshire Council Employment Initiative £12,502
2020-2022 North Ayrshire Council New Better Off £315,955
2021/22 Ayrshire TSI
Communities Mental Health +
Wellbeing Fund £40,875
2021/22  North Ayrshire Council Long-term Unemployed Fund £4,382
2021/22 Other Other £1,200
2021-2023
(ended Mar 23) Scottish Legal Aid Board Debt Advice Journey £133,360 
8. Monitoring and evaluation process 
Please include detail on – 
[a] What monitoring, and evaluation processes are planned/in place? 
We have a secure, online caseload management system in place for recording and monitoring all activity within our
existing services which will be utilised for any new projects. This system is password protected with a two-stage
validation. This allows us to run reports to monitor our activity and report on the impact our work has on our
clients and their families. 
86

Page 87

This allows us to capture outcomes such as: 
• Number of clients referred.
• % of clients engaged.
• Issues clients need support with.
• Successful outcomes.
• Financial gains. 
Additionally, we have an evaluation and service user feedback process in place which allows us to capture the
impact that our support has on our clients, their families, and their lives in general. By maintaining a flexible
approach to this – clients can provide feedback over the phone or anonymously online – it allows us to gain more
open and honest feedback from clients which allows us to make positive changes within the organisation where
applicable. The evaluation captures various elements of the client journey, including: 
• Satisfaction with the overall service.
• Did they feel at ease with their adviser.
• How easy did they find it to access our services. 
• Was their appointment method suitable.
• Has our service improved any of the following for them:
 Finances
 Health
 Improving confidence
 Quality of life
 Reducing stress
 Social circle/activities
 Employment
 Education 
• Any other comments regarding the service. 
We conduct service user focus groups in order to speak to clients, providing an open forum for our clients to give
us honest feedback and suggestions around what we are doing well, and what improvements we can make. 
We also use this opportunity to provide information around upcoming service developments so that we can gain
reactions and responses to these, ensuring we are on the right track and making changes relevant to service users,
and the problems being faced in people’s day-to-day lives. 
By capturing this information, it allows us to demonstrate what impact the work we do has on individuals, their
families, and the overall community. 
87

Page 88

88

Page 89

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Cost of Living Crisis 
Purpose:  To provide a third progress report to Cabinet in relation to the
North Ayrshire Council responses to the current cost of living
crisis and associated investments and funds. 
Recommendation:  It is recommended that Cabinet: 
a) Notes the progress the Council has made in developing
support in relation to the cost-of-living crisis; 
b) Agrees to discontinue reporting on those areas for
which the funding has been fully expended; and
c) Agrees to accept future progress reports on the investments,
funds and activity associated with the cost-of-living crisis. 
1. Executive Summary 
1.1 North Ayrshire Council is designing and delivering a range of investments and
initiatives to mitigate the impacts of the current cost-of-living crisis for its residents.  
1.2 There have been two previous reports to Cabinet, (22nd November 2022 and a follow
up on 30 May 2023). This third report provides a comprehensive overview of the
current investments, funds, and activity relevant to the cost-of-living crisis, progress to
date and next steps. This report will continue to form the basis of future six-monthly
reports and progress will continue to be reported to Cabinet on a regular basis. 
2. Background 
2.1 The current cost-of-living crisis has resulted in a series of challenges for residents,
communities, and businesses in North Ayrshire. The ongoing impact of the pandemic,
the war in Ukraine and economic unpredictability, compounded by the energy crisis,
increased inflation and increased interest rates has resulted in higher household
prices which have created hardship and financial exclusion for citizens, including
North Ayrshire residents. 
Agenda Item 7
89

Page 90

2.2 The UK rate of inflation stayed at 6.7% in September, the same rate as August,
according to the Office for National Statistics. This means prices are still rising at the
same rate as the previous month. Petrol and diesel costs kept inflation up, the ONS
says, but food and non-alcoholic drink prices fell for the first time since September
2022.  
2.3 The International Monetary Fund forecasts the UK will have the highest inflation and
slowest growth next year of any G7 economy, falling behind the US, France,
Germany, Canada, Italy and Japan. It downgraded the UK's prospects for next year,
estimating the economy will grow by 0.6%, making it the slowest growing developed
country in 2024 - widely predicted to be a general election year. The IMF says the
UK's immediate prospects are being weighed down by the need to keep interest rates
high to control inflation, which has been falling but remains stubbornly above target. It
has warned Bank of England rates will peak at 6% and stay around 5% until 2028.
Rates are currently 5.25%.   
2.4 In 2023, North Ayrshire has the 7th lowest employment rate in Scotland (71.3%)
compared to a Scottish average of 74.7%. 
2.5 The North Ayrshire rate for claimants as a proportion of the working age population
(aged 16-64) is 4.6%. This compares to regional figures of 4% for East Ayrshire and
3.4% for South Ayrshire and a Scottish average of 3.3%. This dataset is for March
2023 and shows the rate has remained the same compared to other areas where
figures have increased. 
(Source: Dataset Selection - Query - Nomis - Official Census and Labour Market
Statistics (nomisweb.co.uk)) 
2.6 North Ayrshire’s vulnerability to the current economic crisis provides the context for the
updates to Cabinet in relation to current national and local interventions. 
UK Government Response 
2.7 The Energy Bill Support Scheme gave every household a £400 discount on their
energy bills for winter 2022 to 2023. This ended in March 2023. 
2.8   The Warm Home Discount Scheme (£150) is available for winter 2023 to 2024 to
those who: 
• Get the Guarantee Credit element of Pension Credit
• Are on a low income. 
90

Page 91

2.9 Other kinds of support include: 
• Up to £900 in 3 separate Cost of Living Payments for households on means-tested
benefits;
• A £300 pensioner Cost of Living Payment, to be paid alongside the Winter Fuel
Payment for 2023 to 2024;
• A £150 disability Cost of Living Payment for people who get certain disability benefits;
and
• Help from the Household Support Fund from the local council. 
2.10 All businesses will get help with their energy bills as part of the Energy Bills
Discount Scheme (EBDS) from 1 April 2023 to 31 March 2024. 
Scottish Government Response
2.11 The Child Winter Heating Payment is a benefit from the Scottish Government to help
disabled children and young people and their families with increased heating costs
over winter. It’s paid once a year. The payment for winter 2023-2024 is
£235.70. Payments for winter 2023-2024 will begin in November 2023.
2.12 The Energy Bills Discount is a £400 discount on energy payments to help with
household heating and energy costs. This is called the Energy Bills Support
Scheme. It is available if the claimant:
• Lives in Scotland 
• Has an electricity connection to their house.
2.13 The Winter Heating Payment is to help people on low income benefits who might have
extra heating needs. Social Security Scotland pays this to people living in Scotland.
• It replaces the Cold Weather Payment from the Department for Work and Pensions
(DWP) and has the same eligibility requirements.
• Unlike the Cold Weather Payment, Winter Heating Payment does not depend on how
cold the temperature gets.
• Winter Heating Payment is a yearly payment of £50 that’s paid automatically.
91

Page 92

2.14 In July 2023, North Ayrshire received £57,000 revenue of funding from the Scottish
Government Island Cost Crisis Emergency Fund. 
North Ayrshire Response 
2.15 Governance 
2.15.1 In June 2022 Cabinet agreed to set up a new Board to tackle child poverty. With the
escalation in cost-of-living concerns this board now also oversees the Council’s
response to the current cost-of -living crisis. The board is chaired by the Council
Leader. The strategic approach to the themes in relation to child poverty and cost-of-
living are agreed by the Board and explored in conjunction with Community Planning,
third sector partners and residents. 
2.15.2 A consistent approach to identifying actions is ensured by the following approach                                     
2.15.3 Themes explored to date are: 
• No Wrong Door 
• Employability 
• Food
• Childcare 
Two place-based mini-enquiries have been concluded on Arran and Cumbrae to align
with the Scottish Government Island Cost Crisis Emergency Fund. 
92

Page 93

2.15.4 The outputs from this work have informed the three-year Child Poverty strategy and
annual report which was presented to Cabinet in June 2023 and will contribute to
regular updates to Cabinet on the cost-of-living crisis and related expenditure. 
2.15.5 The Council has made substantial investments in tackling child poverty and the cost-
of-living crisis. The most recent of these have been agreed in Cabinet reports of June
2022, August 2022 and the budget of March 2023, where the Cost of the School Day
fund was replaced by the Child Poverty and Cost of Living Fund. This provides £400k
per annum for three years to honour existing commitments in relation to digital
devices, fund developments in community transport and provide support for actions
directed by the Child Poverty and Cost of Living Board.  A Cost-of-Living Workshop
was held in October 2023 where senior managers, Elected Members, partners, third
sector and voluntary organisations met to discuss where the fund could be best
utilised. This focused on gap analysis and identification of opportunities for allocation
of the Child Poverty and Cost of Loving Early Intervention Fund. 
2.15.6 This Cabinet report brings together an overview of these investments, the funds that
North Ayrshire administers locally on behalf of Scottish Government or Department for
Work and Pensions (DWP) which have an impact on the costs of living, progress in
relation to intended impacts and timetables for future progress against the funded
actions. The funds have been organised thematically and this approach reflects the
support we also offer to residents through the Council’s web presence at: www.north-
ayrshire.gov.uk/cost-of-living. 
2.15.7 A number of the funds, particularly those related to addressing the impacts of the
pandemic, have been fully expended. It is proposed that reporting on these is
discontinued. These are: 
• Citrus Energy
• Tenant Grant Fund
• Housing Tenant Hardship Fund
• Children and Families Investment Fund
• Covid-related Community Mental Health and Wellbeing Funds
• Supporting the Resilience of Local Businesses
• Public Transport Travel Scheme
• Covid-related Support for communities. 
2.15.8 Future regular reports to Cabinet will provide further updates on present funds and
related activity as outlined at Appendix 1. 
93

Page 94

2.16 Cost-of-living Themes and Investments 
2.16.1 The themes are as follows:   
Energy Advice and Support     
Food, Clothing and Essentials   
Finance and Benefits   
Children and Families   
Health and Wellbeing   
Business and community including transport for work   
Support for Communities   
Workforce wellbeing 
2.16.2 Further detailed information about the funding associated with the above themes
is contained in Appendix 1, as well as progress in relation to expenditure, future
plans and timescales. 
2.17 Cost-of-living Funding and Activities: Update on current investments 
The following highlights the significant additions and changes since the previous
report. Further detail is included at Appendix 1: 
2.17.1 Island Cost Crisis Emergency Fund: Scottish Government funding for 2023-24:
£57k revenue. 
2.17.2 Significant roll-out of the EnergySmart scheme, including to the islands; 
2.17.3 Notable progress in relation to the Fairer Food Network, with an additional larder
system in Arran and a further larder about to open in Largs; 
2.17.4 Continued effectiveness in the administration of a range of Council benefits; 
2.17.5 Further development of the Financial Inclusion strategy and partnership; 
2.17.6 The effective development of the Parental Employability Support Fund;
94

Page 95

2.17.7 The impact of the role of children and young people in determining
interventions which make a difference to their lives in relation to poverty and cost-
of-living; 
2.17.8 The impact of the Children and Young People’s Mental Health and Wellbeing
funds and approaches; and 
2.17.9 The difference being made to staff by the LiveWell initiatives.  
2.18 Further detailed information about the funding associated with the above themes is
contained in Appendix 1, as well as progress in relation to expenditure, future plans
and timescales. This will continue to form the basis of future associated six-monthly
updates to Cabinet. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Notes the progress the Council has made in developing support in relation to
the cost-of-living crisis; 
b) Agrees to discontinue reporting on those areas for which the funding has been
fully expended; and
c) Agrees to accept future progress reports on the investments, funds and activity
associated with the cost-of-living crisis. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no direct financial implications as a result of this report. 
Human Resources 
4.2 There are no direct HR implications as a result of this report. 
Legal 
4.3 There are no direct legal implications as a result of this report.   
Equality/Socio-economic 
4.4 The purpose of the current report is to provide an overview of the measures which that
Council has taken or delivers to mitigate the impacts of the cost-of-living crisis on our
most vulnerable residents. 
Climate Change and Carbon 
4.5 This report includes information on the Energy Smart scheme which aims to reduce fuel
poverty and increase affordable warmth, whilst reducing carbon emissions and
providing local employment opportunities.
95

Page 96

Key Priorities 
4.6 The proposals impact on the following Council Plan priorities:
• Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people.
• Communities and Local Democracy – we will have active, inclusive and resilient
communities.
• Climate Change – achieving net-zero by 2030.
• A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 Community Wealth Building is an approach to developing more resilient local economies.
It is recognised that as part of the council’s comprehensive approach to CWB, short- term
measures taken to mitigate the effects of the costs of living crisis will contribute to our
medium and longer-term goals of developing a more resilient economy. There are a wide
range of initiatives and actions across each of the pillars which will mitigate the cost-
of-living crisis including: 
• Fair Work – supporting the update of the Real Living Wage and improving job
security for employees.
• Procurement – development of local supply chains and strengthening the
local company business base. 
• Plural ownership – evidence shows that cooperatives and other forms of plural
ownership are more resilient through periods of economic shocks than
shareholder-based businesses, in addition to contributing to addressing social and
economic inequality. 
• Financial Power - Work with partners including credit unions to encourage
progressive finance. 
The forthcoming CWB legislation and the new Ayrshire regional economic strategy
will further strengthen this approach. 
5. Consultation 
5.1 A wide range of partners and residents have been consulted in the development of the
interventions included in the report and improvements to delivery of services has
resulted. The ongoing mini enquiries, on themes such as the “No Wrong Door”
approach, are contributing to interventions and service design. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Audrey Sutton, Executive Director (Communities
& Education), on (01294) 324414. 
96

Page 97

Background Papers
Appendix 1:  Cost of Living Themes & Updates (November 2023)
97

Page 98

1 
Energy Advice and Support 
Food, Clothing and Essentials
Finance and Benefits
Children and Families 
Health and Wellbeing
Business and Community including transport to work
Support for Communities
Employee Wellbeing
North Ayrshire Council Cabinet
Cost of Living Themes and Updates – November 2023
Appendix 1
98

Page 99

2 
Community based energy support
1. Description of
funding stream,
date and amount
£1.726m Energy Smart Scheme was secured as part of the 2022/23 Council budget setting process. 
This was supplemented by an additional £0.450m to support the crisis payment element of the scheme by Cabinet on 23 August 2022. 
At the Council budget of 1/3/23, a further commitment to invest any year end underspend in excess of £1m. This has resulted in an
additional £0.524m being added to the budget, as reported to Cabinet on 30/5/23.
2. Intended impact The key objective is to support residents of North Ayrshire through the cost-of-living crisis by reducing fuel poverty and increasing
affordable warmth, whilst reducing carbon emissions and providing local employment opportunities as part of the programme.
3. Progress to date
against
milestones,
including
expenditure
There are three elements of the Council’s Energy Smart programme, and an update on each is provided below. 
The launch of a partnership with the Energy Agency to signpost households to free and impartial advice through the Home
Energy Scotland helpline 
• The partnership was launched on 19 September 2022 and 2,611 North Ayrshire households have received energy advice since that
date to help lower their bills. 
The additional allocation of £524,000 to offer one-off emergency support payments towards energy bills for low-income families
in 2023/24.  This further supports the £450,000 fund provided for 2022/23. 
• The Energy Smart Emergency Support scheme launched on 31 October 2022 to provide assistance over the 2022/23 winter period. 
• To date, the Council has supported over 1,400 households facing pressure from rising utility bills through the Emergency Smart
Emergency Support scheme.
• A customer satisfaction survey reported an average 4.7 out of 5 level of satisfaction with the financial support offered by the Council
during the cost-of-living crisis. 
The creation of a £1.726 million fund to carry out home improvements to improve energy efficiency and reduce energy bills 
• The initial phase of support launched in January 2023, targeting low-income households who may be eligible for top-up loft insulation.
The second phase of support is in the process of being procured and will offer a wider range of energy efficiency measures and is
anticipated to launch in June 2023. In addition, we have also provided 900 LED bulbs to the 14 food larders to help reduce energy
consumption in homes.
Energy Advice and Support
99

Page 100

3 
• A procurement exercise is nearing completion to appoint a contractor to undertake a range of low-cost energy efficiency measures, in
order to support households through the heating season.  The Energy Smart programme will be used alongside other funding
programmes, for example the Area Based Scheme and ECO4 Flex, to maximise funding opportunities for North Ayrshire households. 
4. What difference
has the
investment
made? 
The following Key Performance Indicators (KPIs) will monitor the success of the programme: 
1) Number of households in fuel poverty helped with energy efficiency advice. 
2) Number of households in receipt of crisis support.  
3) Number of households granted financial assistance for energy efficiency measures.   
• To date, the Council has supported over 1,400 households facing pressure from rising utility bills through the Emergency Smart
Emergency Support scheme.
5. Next steps and
timescales
4) Appoint a contractor to deliver multiple energy efficiency measures in homes from October 2023.
6. Comments The Energy Smart model aims to support residents of North Ayrshire through the cost-of-living crisis by reducing fuel poverty and
increasing affordable warmth, whilst reducing carbon emissions.  Delivery of the sustainability initiative is being implemented across three
stages and incorporating energy efficiency and low carbon behaviour advice, crisis support payment and implementation of physical
energy efficiency measures. 
100

Page 101

4 
Citrus Energy (COMPLETE)
1. Description of
funding stream,
date and amount
Fuel Poverty - increase capacity in Citrus Energy
Fund - Tackling Financial Insecurity: Scottish Government Funding: £0.060m
Date awarded: 15/06/2021 
2. Intended impact  Increased capacity in Citrus Energy allowed the organisation to deliver the additional support in the Garnock Valley and Irvine and
deliver much needed energy advice to local communities. 
3. Progress to date
against milestones,
including
expenditure 
The additional capacity was for a 12-month period and the allocation was fully spent. 
At its budget of March 2023 Council approved any balance of underspend in 2022/23 beyond £1m to be used to provide funding for
further emergency support payments to citizens to help with their energy bills. This funding will be in addition to the previously secured
£450,000,
4. What difference has
the investment
made? 
Additional information and advice has been provided at a critical time for residents seeking support.
5. Next steps and
timescales 
As 3. above
6. Comments This work was initiated as a result of learning from the pandemic. 
101

Page 102

5 
Fairer Food
1. Description
of funding
stream, date
and amount 
Fairer Food System 
Fund: Recovery and Renewal Investment Fund - £0.150m 
Support to Fairer Food Network 
Fund: Tackling Financial Insecurity SG – 2021/22 Winter - £0.247m 
North Ayrshire Fairer Food Network 
Fund: North Ayrshire COVID Economic Recovery Fund - SG Funding - £0.142m Community Food Network 
Fund: Original Investment Fund - £0.500m
Cost of School Day Food allocation: £150,000 
2. Intended
impact
The prevention of food poverty through the provision of food with dignity. The aim is to reduce the cost of the weekly shop, not to provide a
full shop, so that family budgets go further. This minimises pressure on the foodbank. Funding has been used for food vouchers during
holidays and the provision of warm clothing/footwear/outdoor wear and basic household items, such as toiletries. It also includes support
for self-isolation on islands, mental health, energy, and money advice. 
3. Progress to
date against
milestones,
including
expenditure
A network of community food larders has been established with North Ayrshire Fairer Food branding.  The Council provides support in food
safety, health and safety and other regulations.  The NA Fairer Food Network of community food providers meet regularly and have been
co-developing, sharing good practice and piloting bulk-buying, as well as establishing community benefit partnerships. 
Fairer Food System 
Allocation fully spent.  This was the initial funding allocation that started off the establishment of the network.  Expenditure included
shelving, tills, resources for cooking & food preparation areas, initial stock, branding, fridges, freezers, chill cabinets etc. £0.150m 
Support to Fairer Food Network
• NA Food Resilience (Community Hubs and NA Foodbank) Peripatetic Support Officer supports the transportation of supplies such as
emergency parcels, larder top up stock, delivery, and uplifts of stocks/equipment/materials across all sites.  Funding to cover additional
Venue Assistants for food support at Whitlees Centre.  Emergency stock supplies and equipment investment for emergency situations
including BBQs for each larder site.  Additional urns, crockery and twelve months Foodbank Co-ordinator and cook costs: £0.077.
• Food Larder Development: Top up for winter food supplies, marketing and promotion, equipment and adaptations, training of staff – The
Royal Environmental Health Institute of Scotland (REHIS), Elementary Food Hygiene, Financial Regulations: £0.143m.
• Community Cafes: Costs for food, supplies to host free soup days, coffee mornings or similar targeting financially vulnerable and
isolated. Investment in equipment within Community Cafes:  £0.027m. 
Food, Clothing and Essentials
102

Page 103

6 
Cost of the School Day (Food element) 2021/22
• Reusable water bottles were purchased for all North Ayrshire school pupils.  Water bottles reduce the need for pupils to purchase
single-use plastic liquids during the school day.  Providing all pupils with a water bottle reduces stigma and promotes healthy practices. 
It is also more environmentally friendly.  
• Those accessing Community Larders with school aged children were provided with supplementary food items linked to the cost of the
school day.   
Cost of the School Day (Food element) 2022/23 
The community larder network and partners support the needs of families and young people, through breakfast clubs and community food
supply. 
North Ayrshire Fairer Food Network 
The North Ayrshire Fairer Food Network is our local alternative to foodbanks and is aimed at addressing food insecurity in a dignified way. 
Further development of the larders and shops will support low-income residents by developing and improving the sustainability of the
existing network. New initiatives and business models include community fridges, community cafes, social enterprises based on growing
produce and better links across providers. It will also focus on support for the islands communities so that approaches are developed which
fit their specific needs: £0.142m. Ongoing NAC support to North Ayrshire Fairer Food Network External consultants completed a review of
the larder models, which vary depending on the local aims of the community organisation. The NA Fairer Food Network has agreed a
model which should sustain current demand for 3 years, supported by the allocation of £500,000 from Cabinet. 
The payment model to distribute this funding will provide a quarterly payment for 12 quarters dependant on the larder footfall. This model
allows capacity to expand as the cost-of-living crisis continues and more families and households need to access the provision. We
anticipate continued growth in weekly appointments over the coming winter months. 
The second payment supported 15 larders as Eco Savvy on Arran now has a subsided food model running in conjunction with their Zero
Waste cafés on the island. 
Following the quarterly payment in April 2023, a review of the data highlighted that member numbers had steadied and a review of the
payment structure showed that the majority of larders had under 100 weekly appointments. An amended was therefore made to the
payment structure which is as follows:
Quarterly payment budget - £25k
Up to 29 weekly appointments - £1000
The updated model provides a fairer cost per household but acknowledges that payments will change each quarter dependant on footfall. 
To date £75k has been allocated to 15 providers across North Ayrshire.
It was also agreed that £100k of the £500k be held in reserve to support any new larder set ups and infrastructure development. 
This fund is currently being utilised to set up the new larder in Largs library which will open early winter 2023. 
103

Page 104

7 
A community consultation is currently underway to assess if there is a need for assisted food provision on Cumbrae. 
4. What
difference
has the
investment
made? 
15 Community Larders are now operational.
The network support group meets quarterly, and members are part of a communication group for peer support.
Weekly footfall across the Larders is c.850 per week (families/members). 
Average weekly footfall has now levelled and approximately 600 households are making use of the provision each week.
Membership is far greater than the weekly footfall estimated and is currently in excess of 2000. 
“The people coming in are from all demographics, from those working to those on benefits.”
“The groups have become experts in where to buy and how to get the best value for money from supermarkets and other suppliers.
However, what is being offered in the larders is being changed to meet the budgets available and rising cost of food.” 
5. Next steps
and
timescales
The Fairer Food Forum grows in capacity and influence and ongoing self-evaluation of the network continues to inform activity. 
6. Comments The models have to align with the aspirations of community volunteers and the available budget. There is considerable potential for the
larder volunteers to offer advice and refer to other partners, such as Home Energy Scotland (more than half of the 15 larders have already
completed their referral training and can now signpost via Home Energy Scotland’s online portal)
Refresher training is currently on offer for existing and new referral partners and has been offered to all larders. 
Tenant Grant Fund (COMPLETE)
1. Description of
funding stream,
date and
amount 
The Scottish Government provided an allocation of £10m to Scottish local authorities during financial year 2021/22 to provide direct
financial support to tenants - via landlords in their area - for the specific purpose of paying rent arrears arising from the impact of the
COVID-19 pandemic.  It was aimed at highly vulnerable tenants who would become homeless or did not have alternative sources of
support.  Coronavirus (COVID-19) Tenant Grant Fund: North Ayrshire Council received an allocation of £298k.
Finance and Benefits
104

Page 105

8 
2. Intended impact The grant is to help prevent homelessness and sustain tenancies by directly reducing, alleviating, or paying off rent arrears altogether,
where a tenant is in either the social or private sector, and has faced difficulties due to Coronavirus.  The grant covered arrears arising
between 23 March 2020 and 9 August 2021. 
3. Progress to
date against
milestones,
including
expenditure 
The full allocation of funding has been spent; it was closed to new applications on 31 March 2022. 
Total expenditure was £298,259.65, split across 2021/22 and 2022/23.
4. What difference
has the
investment
made? 
555 applications were received, of which 460 were awarded grant.  Of the remaining 95 applications, 75 were closed, 18 were assessed
as not eligible and 2 were refused by the relevant landlord. 
Applications Approved No of applications Amount paid
Private let 29 £18,665.39
RSL 92 £54,978.63
NAC 341 £224,615.63 
5. Next steps and
timescales 
N/A
6. Comments Initial spend within the Fund was low despite a high level of applications being received.  Although applications were being made these
couldn’t be progressed due to a number of factors, including the requirement for proofs and non-engagement from either the tenant or
landlord.  In January 2022 officers reviewed processes and engaged with landlords to expedite applications into decision making and
awards being made.  The process was very labour intensive, and staff had to make several contacts with both tenants and landlords
despite best attempts to ensure the information required was fully captured within the application process. 
The fund is now closed with allocated monies being fully spent. 
Housing Tenant Hardship Fund (COMPLETE)
1.  Description of
funding
stream, date
and amount 
The Scottish Government provided an allocation of £867,000 to North Ayrshire through the Scottish Government Winter Support Fund –
Tackling Financial Insecurities.  The supporting guidance detailed flexibility of use across a number of areas to target those most in need
e.g. food support, fuel, isolation, welfare fund top ups, housing, homelessness.   
From this fund the Council’s Housing Service was awarded £195K for help with tenancy hardship, focusing on highly vulnerable tenants
affected by fuel poverty.  
105

Page 106

9 
2.  Strategic
intent:
intended
impact
The funding assists any North Ayrshire Council tenant who is finding it difficult to manage fuel bills.  The Support Worker provides person-
centred housing related support including income maximisation, welfare benefit advice and assistance, fuel, and utilities advice, helping
them to sustain their tenancy and prevent any potential homelessness issue in the future.
The fund helps support winter warm initiatives and interventions for our most vulnerable tenant who are at the greatest risk of fuel poverty. 
3.  Progress to
date against
milestones,
including
expenditure
Funding was carried over into 2022/23 due to the timing of allocation.  
• 4 temporary posts funded until April 2023, at a cost of £142K: 4 Housing Support Workers posts were created at the end of 2021/22 (2 x
Fuel Poverty and 2 x Sheltered Wellbeing).  The funding was carried over into 2022/23 due to the time taken to recruit into the posts.
• Top up of meters to help resettlement from temporary accommodation into mainstream tenancies.  We have set aside £15K and are
currently setting processes up with the Scottish Welfare Fund.
• Assist to top up gas meters where they require to be uncapped in order to re-start a gas supply and allow for a gas safety check to be
completed.  To date we have only spent £210 as we have managed to gain access to other funds via energy suppliers/agencies, but
expectations is that due to funding from these sources being limited we will achieve full expenditure of £10K by 31 March 2023.
• Winter warmth initiatives/interventions - officers are researching what could impact most effectively on making heating and overall energy
cheaper in relation to the cost-of-living crisis.  We currently anticipate expenditure of £28K by 31 March 2023. 
4.   What
difference
has the
investment
made? 
Update to 31 January 2023 we have supported 197 tenants with an average age of 39 to tackle fuel poverty.  7 of these tenants had
previously been known to Homeless Services.  Our engagement rate YTD is 53%.  
We continue to carry out regular visits to each of the 28 sheltered units and have engaged with 641 residents/tenants to date.
5.  Next steps
and
timescales
Fuel Poverty/Sheltered Wellbeing Housing Support Workers 
Continue to engage with tenants/residents to tackle fuel poverty and maximise income where possible to avert crisis with energy over the
winter months – by 31 March 2023. 
Winter Warmth Initiatives/Interventions 
Provide our most vulnerable tenants with access to a range of goods that reduce energy costs over the winter months – by 31 March 2023. 
Sustainability Team 
• Linking in on any of the Sustainability team’s projects that could support tenants. 
• Discussions around the new ‘Energy Smart’:  Energy Based Community Support Model - by 31 December 2022. (completed).  Promote
the service when engaging with tenants – 31 March 2023. 
Social Welfare Fund 
Ongoing discussions with Social Welfare Fund (SWF) Manager about how we can assist with payments for meters for new tenancies (NAC
only, as Registered Social Landlords (RSLs) do this as part of new tenancy set up) and people struggling to meet the cost of energy prices
as they start to rise – by 31 October 2022 (completed).  This is being done via Housing Support staff due to complexes around how this
106

Page 107

10 
would work in-line with the Scottish Welfare Fund and the impact this could have on staffing resources.  This method of working will remain
in place until 31 March 2023 
Social Media/Referrals 
Continue to engage with residents in North Ayrshire via social media and a referral process that will be managed via the Housing Support
Service Co-ordinator - by 31 March 2023. 
Cost-of-living Crisis  
Working with other Council departments/agencies to address Cost-of-living crisis being faced by people at risk of homelessness and also
tenants.  Signposting to other agencies and collecting data on resources available within communities for support through the winter months
– by 31 March 2023. 
6. Comments As funding was not made available until around February 2022, recruitment timescales meant staff were unable to take these posts up until
May 2022.  Within a short space of time the team have achieved great success in engaging with tenants who are in fuel poverty (53%).  The
team have also successfully engaged with tenants and helped to arrange gas safety checks, with gas restored to 370 properties.  This
intervention potentially avoided 370 forced entries into these properties and avoided a cost of approx. £59k to the Council. 
107

Page 108

11 
Scottish Welfare Fund (SWF)
1. Description of
funding stream,
date and
amount 
Total £1,153,120 recurring funding from Scottish Government.   
• £362,4001 allocated to Crisis Grants
• £790,720 allocated to Community Care Grants 
On 30/5/23 Cabinet agreed to earmark additional resources of £327,000 to support additional demand pressures for SWF grants during
2023/24.
2. Intended impact The aim of the funding is to provide financial help by way of a Crisis Grant to those in immediate crisis or a Community Care Grant to
those in need of essential household items.  The funding is intended to provide a Crisis Grant of a cash award to people who are in
financial crisis because of either a disaster like a fire or flood or are in an emergency situation such as having lost all their money, had
their money stolen, or are in need of food.  It is also used to provide energy vouchers for their home.  The award is made using a text
message or email to their phone with a code which can be redeemed at any Pay Point vendor ensuring they can access the cash or
energy top up for their pre-payment meter quickly. 
Community Care grants aim to help people who are leaving any form of care such as hospital or prison or who have been homeless and
require help to set up their own home by providing them with essential household items and furniture.  It can also be used to help
households facing exceptional pressure with on-off items such as a washing machine or cooker. 
3. Progress to
date against
milestones,
including
expenditure 
Crisis Grants: £139,057
Community Care Grants: £172,558
Total spend: £311,615 
4. What difference
has the
investment
made? 
This financial year to date, the Scottish Welfare Fund has helped 1,832 people in financial crisis with a Crisis Grant.  1,230 people have
received fuel vouchers, and 920 people have received a Community Care grant to help with essential household items and furniture. 
5. Next steps and
timescales 
Continue to accept and process applications as quickly as possible throughout the year. 
6. Comments The SWF is delivered using a “One Team” approach ensuring that when someone calls to apply for a Crisis Grant that a decision to
award is made whilst the customer is on the phone and the payment can be made quickly to enable them access to much needed cash or
fuel vouchers. 
108

Page 109

12 
Council Tax Reduction Scheme (CTR)
1. Description
of funding
stream, date
and amount 
North Ayrshire Council has committed £13,573,546 to support the Council Tax Rebate Scheme during 2023/24.
2. Intended
impact
To help those on lower incomes by lowering the amount of Council Tax that they are liable to pay.  This is based on age, household
structure and income and is charged on a per dwelling basis rather than to individuals.
To fund CTR awards to all eligible households on a low income across North Ayrshire. 
3. Progress to
date against
milestones,
including
expenditure 
At 31st August 2023 it is forecast that expenditure for the year will increase by a further £379,099, taking the total expenditure to
£13,952,645.
4. What
difference
has the
investment
made? 
CTR has enabled Council Tax bills to be more affordable for lower income families.  The current caseload is 16,614. 
5. Next steps
and
timescales 
Continue to ensure that there is high uptake of CTR and that it is awarded quickly for those eligible.
6. Concluding
comments
Automation of CTR has been introduced to ensure that any notifications received from The Department for Work and Pensions (DWP)
confirming eligibility or changes are automatically applied to the relevant Council Tax account. 
109

Page 110

13 
Housing Benefit (HB)
1. Description of
funding
stream, date
and amount 
For 2023/24 it is forecast that total Housing Benefit expenditure will be £35,748,886.
2. Intended
impact
To help people who are on unemployed, on a low income or claiming benefits towards paying their rent costs.
Housing Benefit is aimed at pensioners and people of working age who are unemployed, on a low income or claiming benefits and have
not yet been moved across to Universal Credit to help them towards paying their rent costs. 
3. Progress to
date against
milestones,
including
expenditure 
Year to date expenditure is £19,106,821. 
4. What
difference has
the investment
made? 
This has helped people to afford to keep their tenancy and helped prevent them from falling into arrears with their rent. 
The current caseload is 7,348.
5. Next steps
and
timescales 
Continue to ensure that Housing Benefit claims and changes of circumstances are processed quickly and accurately.
6. Comments  N/A 
110

Page 111

14 
Discretionary Housing Payment (DHP)
1. Description of
funding
stream, date
and amount 
For 2023/24 North Ayrshire Council has agreed funding of £2,751,621 to support DHP.
2. Intended
impact 
The aim is to provide financial help to people claiming Housing Benefit or who receive housing cost payments through Universal Credit
but their benefit is less than the full amount of their rent.  DHP is used to help cover the shortfall.  
3. Progress to
date against
milestones,
including
expenditure 
Year to date: £1,571,779 has been awarded in total.
4. What
difference has
the investment
made? 
This has helped people to afford to keep their tenancy and helped prevent them from falling into arrears with their rent. The current
caseload is 2,416.
5. Next steps and
timescales 
Continue to ensure that DHP claims are processed fairly and quickly within the budget.
6. Concluding
comments 
DHP requests are managed annually within the budget. 
111

Page 112

15 
Financial Inclusion
1. Description
of funding
stream, date
and amount 
Recovery and Renewal Investment Fund 
Financial Inclusion: Progressive Finance Access to Finance (1st Alliance): £0.150
2. Intended
impact
North Ayrshire Council approved funding for the 1st Alliance Community Bank (formerly Credit Union) to deliver a progressive finance
scheme, to lend to individuals, who are considered as a higher t risk due to credit history, but who can however afford repayments.    
Small loans would be available to low-income residents who would not normally qualify through typical lending rules i.e., due to the
higher risk factor, the credit union would not be able to lend from members’ funds.  The agreed period for this investment is 1st October
2021 to 1st October 2023 (or whenever the capital investment is exhausted if prior to this date) and the total grant funding has been
paid in three instalments.  North Ayrshire residents who borrow from 1st Alliance must save a minimum of £3/week to access a loan (this
saving and borrowing model is standard for Credit Unions), therefore borrowers will at the same time become savers.  In the longer term
this will provide a safety net for both planned and unplanned expenses and reduce the need to borrow from other sources, including
high-cost lenders, or to fall into debt, including arrears with bills.  The fund is recycled as each loan is cleared off and the member
moves onto a members-based loan.  This will therefore provide a legacy fund which will enable 1st Alliance to continue providing low-
cost loans to “high risk” customers in the future. 
In December 2022, it was agreed that the final £50k payment would be used to provide a one-off incentive of £25 to be allocated to a
new savings account, to encourage new savers to establish a ‘savings habit’. As a result, regular savers will build a savings pot which
will provide some security for unplanned expenditures in the future and they will also become eligible to access member-based loans
through 1st Alliance, thereby also improving access to affordable credit. 
3. Progress to
date against
milestones,
including
expenditure
To the end of August 2023, 214 individuals accessed loans through this investment.
The total value of loans to date is £162,210 and the loans agreed range from £300 to £2000 with the majority agreed at £500.
63 loans were agreed from August to December 2021. 
36 from January to June 2022.
29 from July to September 2022
32 from October to December 2022
58 from January to August 2023.
Borrowers are from across North Ayrshire with the majority being from Irvine, Kilwinning or the Three Towns.  14 were from Garnock
Valley, 3 from the North Coast and 3 from Arran. 
A total of 130 loan requests were declined due to lack of affordability or defaults on credit files, large amount of gambling on bank
statements, bad debt with 1st Alliance or being in a trust deed.
39 loans are currently in arrears, a total of £11,624 which represents 7.17% of total loans. 
112

Page 113

16 
A standard assumption of 5% bad debt provision had been assumed.  This higher rate of bad debt applies to all 1st Alliance loan
portfolios and they believe it to be linked to a number of factors including the increase in cost-of-living. 
160 individuals have benefitted from the £25 incentive to open a savings account. 
The full allocation of £0.150m has now been paid to 1st Alliance Credit Union for the purposes of the Progressive Finance Initiative.
4. What
difference
has the
investment
made? 
Borrowing through 1st Alliance costs less on interest rates than most other lenders.  For example: 
1st Alliance: £400 loan = 10 per week for 11 months = £72 interest.
Scotcash:   £400 loan = £12.21 per week for 12 months = £234.78 interest & £24 fee. 
This investment has therefore provided access to low-cost affordable loans for residents who would otherwise either have gone to
higher cost lenders or have fallen into debt due to not being able to access a loan from anywhere.
55 loans were to buy out high-cost debts which have higher interest rates. 
The other loans were for a range of purposes including purchase of household items, clothes, events, holidays and for Christmas, which
accounts largely for the higher number of loans agreed. 
201 borrowers are regularly saving.  A total of £37,078 has now been saved, an average of £142 per save
88 borrowers have now accessed top-up loans which means that the interest rate is reduced, as they have evidenced that they are
responsible borrowers. 
Of those who benefitted from the £25 incentive, a total of £37,07 has been saved to date, representing an average of £232 saved per
individual new saver. 
5.  Next steps and
timescales 
Progress will continue to be monitored. The final payment of £50,000 has been transferred and discussions are taking place to ensure
this progressive finance model is embedded within the new Financial Inclusion Strategy and service for North Ayrshire
6. Comments The investment is proving to be beneficial to North Ayrshire residents who may otherwise have been unable to access low-cost
affordable loans, meaning that they have been able to cover additional unexpected and expected costs, purchase essential household
items, and reduce higher costs loan payments.  Many have improved credit ratings and/or moved on to top up loans with a lower
interest rate and most have built up some savings, many of whom may not have managed to save before. 
1st Alliance is now building that ‘legacy fund’ which will benefit residents beyond the scope of this investment period. 
113

Page 114

17 
Financial Inclusion Capacity Building
1. Description of
funding
stream, date
and amount 
£258k for Financial Inclusion, agreed at August 2022 Cabinet. 
At its budget on 1/3/23 the Council allocated up to a further £0.100m to build on the previous investment of £0.258m to implement the
review of financial inclusion services across the Council and to secure a level of support which is more commensurate with current need. 
2. Intended
impact
The funding allocation was made to support the increasing demand for financial inclusion supports which is currently being experienced
through the Money Matters and Welfare Reform Advice Teams. 
Non-recurring funding has been used to: 
• Commission of an independent debt advice service for North Ayrshire for 2 years to address an identified gap in debt advice provision. 
• Extend the Better Off pilot as required to ensure smooth transition and continuity of service – currently agreed until end June 2023 
• Development of case management system and IT infrastructure  
• Salary plus costs for the Senior Manager post for 24 months 
• Marketing materials associated with a Communications Plan 
This will address the increasing demand for both welfare rights and debt advice across North Ayrshire.  
3. Progress to
date against
milestones,
including
expenditure
The new Senior Manager (Financial Inclusion) came into post in January 2023. An interim five-year Financial Inclusion Strategy for North
Ayrshire was developed and approved by Cabinet on 21 March 2023 and is now in process of being implemented.
Money Matters (HSCP) and the Welfare Reform and Advice Team are both now in HSCP and from 1 April 2023 and the Managers
started reporting to the new Senior Manager (Financial Inclusion).
As agreed at Cabinet in March 2023, the funds, to date, have been used to contract out a two-year independent debt advice service for
residents across North Ayrshire. The contract was awarded to CHAP and started on 1 July 2023, following the ending of the Better Off
pilot on 30 June 2023 (extended from the original 31 March 2023 end date). In addition, costs associated with promotional resources for
the debt advice services, and Financial Inclusion Partnership events have been met from the total budget.
Additional anticipated expenditures include those associated with the development of, and transition to, a new case management system.
A Technical Appraisal carried out by the Transformation Team was presented to the Project Board on 13 September, recommending a
move to AdvicePro for Money Matters (Welfare Reform Advice Team already use this system).
A key intention in the Strategy was to establish a Financial Inclusion Partnership which was achieved in May 2023. The Partnership now
has 29 members and an action plan for the Partnership is being developed. 
4. What
difference has
the investment
made? 
During July/August there were 48 referrals to the new debt advice service. The first milestone was 50 referrals in the first three months
which will be achieved. The target for the first year is 300.  
Of those referrals, 20 were from Money Matters and 3 from the Welfare Reform Advice Team. 15 were self-referrals. 
114

Page 115

18 
The provision of this new universal debt advice service means that there is now local face to face provision of money and debt advice for
anyone resident in North Ayrshire, which has been a gap for the last three years.   It also enables the Welfare Reform Advice Team to
refer on some debt cases which will alleviate the pressure on the team which saw a 400% increase in council tenants referred for debt
advice over the last three years. 
A Consultation Working Group was established through the Partnership and a Community Consultation was developed and agreed, to
inform the review and refresh of the Strategy for 2024-28. A Stakeholder Consultation is being developed.
A mapping of all advice services was carried out through the Partnership and an interactive map, showing all advice services available
across North Ayrshire, is currently being developed. 
5. Next steps and
timescales
• To monitor the debt advice contract
• To launch the consultations to review and refresh the FI Strategy which will be presented to Cabinet in February 2024 for approval.
• To work towards development and implementation of AdvicePro as the new shared case management system for Money Matters and
the Welfare Reform Advice Team. 
6.  Comments N/A 
115

Page 116

19 
Parental Employment Support Fund (PESF)
1. Description of
funding stream,
date and amount 
Parental Employment Support Fund (PESF): Scottish Government fund to support for unemployed and employed parents within the
key priority groups: 
• Parents who are <25 years of age
• Parents with a child under 1 year old
• Parents with 3 or more children
• Parents who have a disability or disabled children
• Ethnic minority parents
• Single parents 
1st April 2022 – 31st March 2023 £282,132
1st April 2023 – 31st March 2024 £1,269,000 
2. Intended impact The expected outcomes and objectives for PESF are as set out below: 
• Person-centred support for parents to address barriers to work including skills development, work experience, health support,
money advice, motivational support; 
• Support for parents already in work through the provision of training and employability support to sustain employment and progress
within the workplace by gaining improved employment;
• Maximise opportunities to reduce child poverty by enhancing income through employment;
• Providing support and relevant training that helps participants to progress through all stages of the Strategic Skills Pipeline; and 
• Delivering an employability system that supports more people, particularly those facing multiple barriers, to move into the right job
at the right time.
• 
3. Progress to date
against
milestones,
including
expenditure
This funding supports the continuation of We Work for Families, contracted for delivery by The Lennox Partnership, with keyworkers
delivering tailored employability support to families across North Ayrshire.   
During 2022/23 167 new parents were registered for support and 67 progressed into employment.
During 2023/24 the annual investment plan sets the ambition to support 435 new parents and 80 parents already in employment.
Referrals are received from health visitors, DWP and education providers through co-location models and close partnership working
with these key stakeholders and referral partners.   
A new approach has been established through ‘Family Navigators’ within our We Work for Families team. They are community based
and this has resulted in a higher number of referrals to the programme increasing the reach and engaging more parents in an
employability journey.
116

Page 117

20 
As part of employability week in May the Employability Hub in Ardrossan was launched as a Parental Employment Hub offering
additional training opportunities for parents. 
A vocational training fund for working parents on low incomes has been launched and is delivered by CEiS Ayrshire as part of the wide
range of interventions delivered by Your Next Move Working North Ayrshire. 
Other highlights include: 
• Step into Business pilot supported 10 parents to secure mentored vocational placements with Anchors Organisations including
NHS, Fire & Rescue, Ayrshire College following their achievement with all completing a PC Passport qualification.
• Care at Home (Day Shift pilot) saw 5 parents graduate after a six-month mentored vocational placement and all 5 offered contracts,
wage increase and hours that suit the family.  Driving lessons for 4 of these parents are being funded from DWP’s Flexible Support
Fund.
• Step into Family Health & Wellbeing had 12 parents attend 8 weeks training, confidence building workshops, gym inductions, first
aid certificate and all were delighted to receive a 6-month family leisure pass.  Childcare was provided for these parents to attend,
providing wraparound support from a range of key partners.  
4. What difference
has the
investment
made? 
The investment has improved engagement, delivered a pilot to develop new referral pathways which will increase volumes of parents
supported in the future.  During 2023/24 (at September 2023) 152 new parents have been registered for support and 41 parents have
secured employment withing this time. 
This investment has also supported the creation of Parental Employment Team to co-ordinate interventions across the parents to
ensure a sharp focus remains on job outcomes.  The investment will support additional paid work experience opportunities with 30
parents recently commencing employment with Third Sector Organisations, delivered in partnership with TACT. This will build capacity
and also offer paid work experience for parents preparing to secure sustained employment. 
5. Next steps and
timescales
Continue to deliver the NOLB Annual Investment Plan to extend the reach to more parents from the priority groups and deliver job
outcomes for parents. 
6.  Comments Income from employment is a key driver to take children out of poverty and we will continue to support parents to increase their
household income through securing and progressing through employment. 
117

Page 118

21 
Free School Meals
1. Description of
funding stream,
date and amount.
1) Scottish Government revenue funding for holiday meals 2023/24 (£704k) 
2) Scottish Government revenue funding for 2023/24 (£900k). 
2. Intended impact The funding supports the continued roll out of Universal Free School Meals (UFSMs).  This funding is the revenue funding to cover
costs for Primary 4 & Primary 5 children in the financial year 2023/24.  The Scottish Government also provides funding to enable a
continued provision of food-based support during the school holiday periods to those children with an assessed eligibility for free
school meals. 
3. Progress to date
against
milestones,
including
expenditure 
• Direct cash payments will now be made to all families with an assessed eligibility for free school meals during key holiday periods
for the school year. Additionally, a summer programme ran over the month of July each year across all localities.  Over 11,000
meals were served in July 2023 along with a variety of activities for all age groups.
• The Scottish Government has provided revenue funding of £570,000 in 2023/24 to start the roll out of free school meals to all P6
and P7 pupils whose families are in receipt of the Scottish Child Payment however we await a start date for this.  Further scoping
work is underway by the Scottish Government to establish revenue and capital requirements for any further roll out. 
4. What difference
has the
investment
made? (Stats and
qualitative
information)
• Summer meals provided: 11,408
• Direct cash payments were made for circa 5,000 children at Easter, Summer and October holiday periods.
• Uptake of school meals has increased for primary 4 & primary 5 children following the UFSM provision roll out however, overall
uptake for UFSMs is lower than anticipated.  This is the general trend across other authorities.
5. Next steps and
timescales
The first phase of capital work required to accommodate a further roll out of UFSMs has been completed and planning for the second
phase is under way.  
Direct payments will be made for future holiday periods which are aligned to the cost of a school meal. Cash payments allow more
flexibility on the use of the funding and a more dignified provision for eligible families. 
6. Concluding
comments
Holiday meal provision (food or direct payments) ensures continuity of food for all children assessed as eligible for FSMs.  This
supports access to food and removes a financial burden from families. 
The expansion of UFSMs continues to support all families in this difficult economic climate.  Many families who are not eligible for
assessed-need FSM, are also struggling with the cost-of-living increases therefore a wider universal free provision of a hot meal eases
the financial burden of having to pay or provide an alternative lunch option. 
Children and Families 
118

Page 119

22 
Cost of the School Day and Early Intervention Fund – Child Poverty and Cost of Living
1. Description of
funding stream,
date and
amount. 
Cost of the School Day 
Fund – Council budget 04/03/2021 and Cost of the School Day Cabinet Report 23/03/2021 
Date allocated - 2021/22 budget 
Amount - £0.500m pa (recurring) 
At the Council budget of 1/3/23, this fund was replaced by the Early Intervention Fund – Child Poverty and Cost of Living – one off
investment over 3 years @ £400p.a. The allocation of this fund will take into account existing commitments and is being directed by
the Child Poverty and Cost of Living Board). 
2. Intended impact The Cost of the School Day work has been focussed and two separate groups. Initially to professionals that work with young people
across North Ayrshire and secondly to young people from both primary and secondary across North Ayrshire. 
The initial concept came from consultation during Year of the Young People in North Ayrshire where our legacy plan highlighted cost
of the school day and child poverty as a key priority for our young people focussing on the following key areas:
• Access to food (during the school day and holidays and weekends)
• The cost of school transport to and from schools and for extracurricular activities
• The costs of school trips and visits
• The costs of school uniforms
• The costs of materials needed for going to school. 
As one of the key priorities within our rights-based CLD Strategic Plan, it’s especially pertinent in North Ayrshire, with the second-
highest concentration of child poverty in Scotland, with greater risk of key groups of young people in North Ayrshire living in poverty.
Therefore, the work that we carry out around child poverty is essential. Our methodology of, “By young people, for young people” is
embedded in our work and our Youth Participation Strategy with young people coming on journeys of change with us
Young people lead on discussions around child poverty, shaping policy and practice for North Ayrshire Council and partners, they are
involved in all initiatives that have come from the data in a co-design, co-production and co-delivery model. This work shows visible
changes to our approach to lowering the cost of the school day for young people and their families. 
Youth Services and Education jointly plan, alongside our young people, for delivering events, activities, creating feedback loops and
disseminating information to young people and their parents. Young people are empowered to speak truth to power, support and
challenge officials and decision-makers as duty bearers and to ensure young people voice is respected and acted on in relation to
Child Poverty. 
3. Progress to
date against
There have been three key elements:
119

Page 120

23 
milestones,
including
expenditure
1000 new digital devices each session for those in greatest need (ongoing and now funded from the Early Intervention Fund – Child
Poverty and Cost of Living fund).
£100k for school uniform, winter clothing, outdoor learning, sports – participatory approach with schools (ongoing in 2023/24).
£150k for food in partnership with community organisations.
The Cost of the School Day work has been ongoing since the start of 2022 and we continue to consult and engage with our young
people, allowing us to shape the services and policy changes based on what young people tell us. Young people are involved in any
changes to service delivery, new models of engagement and shaping policies for North Ayrshire and its partners.  Changes as a result
of engagement and involvement of young people include the following: 
• Non branded uniforms policy has been implemented across all of our schools;
• Policy on no gifts for teachers;
• Increase in breakfast clubs and swap shops in schools and communities;
• Family learning providing opportunities for extracurricular activities across schools;
• Increase in homework clubs;
• Increased uptake and use of the transport for U22 scheme;
• Healthy snacks free of charge in all primaries through PEF funding;
• Access to digital materials for all pupils;
• Holiday meals provisions – over 11,000 young people accessed this over the summer period 2023; and
• Joint working across CLD and Education has allowed us to engage more young people and children in activities, opportunities and
feedback – the commitment to young people’s active participation around voice and rights is increased across schools.
The youth-led PB process and community PB has a key theme of poverty and inequality to support local groups and initiatives in
delivering activities and support for young people around child poverty and cost of living. 
4. What difference
has the
investment
made? (Stats
and qualitative
information)
Cost of the School Day funding has provided schools with enhanced flexibility to meet the needs of learners and their families
throughout the ongoing cost of living crisis. Schools have utilised this funding in a variety of ways, which have been designed to meet
needs within their local context. While it is challenging to quantify the difference made, qualitative evidence is gathered at school level.
Loudoun-Montgomery Primary School, as a school located in one of North Ayrshire’s areas of highest deprivation, provides a good
example of the difference this funding has made. The school has used this funding to put in place a breakfast club and morning snack;
opportunities for families to access free school uniform; and participate in home learning through provision of IT devices and other
learning materials that promote family learning. Another key use of this funding has been enabling all pupils to participate in school
trips and other extra-curricular activities. Loudoun-Montgomery’s Head Teacher believes: “our child centred focus on reducing the cost
of the school day enhances our ability to broaden our learners’ experiences, deliver a wider curriculum and extend learning beyond the
school day.  Our focus on ensuring that pupils look and feel their best and the provision of a healthy breakfast, snack and lunch all play
a significant part in setting up our children to embrace the learning ahead of them each day.” 
120

Page 121

24 
5. Next steps and
timescales
We will continue to engage and consult with young people with a future conference to link in with Learners’ Voice. This will take place
in November 2023 allowing us to check where we are and where we need to go next to continue to tackle child poverty (we are
currently writing our Learners’ Voice strategy that will complement the Participation Strategy with Education). 
6. Comments The funding has been welcomed by schools as an enabler in reducing the poverty-related attainment gap.
Child poverty will continue to feature across all of our platforms from Locality priorities, our CLD Plan, youth work key priorities and
youth participation work.   The Pupil Equity Fund will focus on child poverty and mitigate the effects of this for our children, young
people and families. 
Children and Families Investment Fund (COMPLETE)
1. Description of
funding stream,
date and amount. 
Children and Families Investment Fund
Fund: Recovery and Renewal Investment Fund - £0.075m
Digital Access Fund
Fund - Recovery and Renewal Investment Fund - £0.255m
Support for the North Ayrshire Child Poverty Strategy and Action Plan 
Fund: North Ayrshire COVID Economic Recovery Fund - SG Funding - £0.076m
Date Allocated – 15/06/21   
2. Background:
rationale for the
funding
allocation
A Cabinet Report on 15/6/21 set out the rationale, including: 
• Prioritise the health and wellbeing of our residents by protecting the most vulnerable in our society against the immediate threat of
coronavirus and the consequences of changes to the way we live.
• Work with our communities in the renewal of services to ensure they meet their needs and priorities. 
• Build community capacity and resilience.
• Ensure our children and young people get the best start in life by creating opportunities for education and employment, including
through Community Wealth Building and Renewal.  Prioritise and help tackle poverty, including child poverty. 
3. Intended impact The aim of the funding was to promote recovery and support the most vulnerable children and families.  Funding also supported the
further reduction in the Cost of the School Day, to contribute towards Scottish Government’s aim of eradicating digital exclusion by
improving digital access and skills, and the ongoing work to reduce Child Poverty and mitigate against its impact. 
4. Progress to date
against
milestones,
including
expenditure
Digital Participation Officer in post 
Review of access to wi-fi and IT resources in community venues complete (18 centres plus 15 libraries) and action plan to developed –
currently implementing the actions 
Wi-fi access map created – available on NAC library app and NAC web page.
Supporting the development of Digital Volunteers and Volunteering opportunities.  
121

Page 122

25 
Established North Ayrshire Digital Access Forum with agreed Terms of Reference in place. 
Events and sessions delivered across North Ayrshire with specific focus in school communities. Strong partnerships are being
developed with Family Learning Teams and school staff.
Supporting Ukranian Hub with essential access to IT resources. 
In partnership with the Digital Officer in TACT, created short films to assist in promoting the support available online and tutorials on
how to access help and complete forms etc.  
Digital Participation Officer sits on the Digital Strategy and Accessing our Council Workstreams   
5. What difference
has the
investment
made? 
Available community-based resources are known and gaps identified. 
Positive feedback from participants attending sessions.
Action plan being implemented: future report. 
6. Next steps and
timescales
The following current actions are: 
• Establish and potentially widen the Forum membership.
• Link with Education on supply of the digital devices and deliver support to assist with the use of the resources. 
• Work with feedback from Chit Chats to deliver bespoke help based on community feedback.  
• Integrate with Community Learning and Development Strategic Plan and support where relevant. 
• Support community associations with IT / internet related safeguarding. 
7. Comments  N/A 
122

Page 123

26 
School Clothing Grants
1. Description of
funding stream,
date and amount 
£852,000 recurring funding agreed by NAC.  Additional funding is provided from the Council to match demand. 
2. Intended impact The aim of the funding is to provide financial help with children’s school clothing and shoes.  An annual payment of £126 is given to
primary school children and £157.50 to secondary school children before the start of the new school year then to new applicants
throughout the year.  The intended impact is that all school children have adequate school clothes and shoes. 
3. Progress to date
against
milestones,
including
expenditure 
Total children: 4,384 from 7,715 families
Total spend: £609,116. 
Breakdown:
2,583 Primary children: £325,458
1,801 Secondary children: £283,658 
4. What difference
has the
investment
made? 
It has provided financial support to 7,715 families and a total of 4,384children to enable them to afford school clothes and shoes. 
5. Next steps and
timescales 
Continue to accept and process applications as quickly as possible throughout the year. 
6. Comments A promotional campaign takes place each year at the start of school summer holiday period to confirm that applications are open. 
Text messages and emails are sent out to previous recipients with a link to the online application form and encouraging people to
apply.  This is also promoted via the Council’s Twitter and Facebook pages. 
123

Page 124

27 
Education Maintenance Allowance (EMA)
1. Description of
funding stream,
date and
amount. 
£597,498 recurring funding agreed by North Ayrshire Council.   
2. Intended impact To provide financial support to young people from low-income families to allow them to be able to afford to stay in post-16 education
either in school or college who might otherwise have left education.  The aim of the funding is to provide financial support of £30 a
week (paid fortnightly in arrears) to 16 to19 year-olds in education who come from low-income families subject to attendance and
agreement of a learning plan. 
3. Progress to
date against
milestones,
including
expenditure 
Total expenditure this financial year to date: £224,940
414 young people have received at least one payment for this school year.
4. What difference
has the
investment
made? 
As payments are made directly into the young person’s bank account, this ensures that they can access the funds easily and use them
for whatever they need to help them maintain attendance in school. 
5. Next steps and
timescales 
Continue to accept and process applications as quickly as possible throughout the year. 
6. Concluding
comments
A promotional campaign takes place each year after the start of the school year in August to confirm that applications are open and
encourage uptake.  This is also promoted via the Council’s Twitter and Facebook pages. 
124

Page 125

28 
Contribution to Mental Health and Wellbeing (PARTLY COMPLETE)
1. Description of
funding stream,
date and amount. 
Contribution to Community Mental Health and Wellbeing (COMPLETE)
Fund - Tackling Financial Insecurity Winter Funding 2021/22: £0.307m
Date Allocated - 29/11/21 
Community Support for Mental Health (COMPLETE)
Fund - Recovery and Renewal Investment Fund: £0.075m
Date Allocated – 15/06/21 
Costs for Island Self-Isolation (COMPLETE)
Fund – Tackling Financial Insecurity Fund  
Date Allocated 29/11/21 
Fund – Children and Young People’s Community MHWB Supports and Services Framework Grant Funding (CYP CMHWB)
2021 -2022 £370,000, 2022-23 £360,000 (total funding allocations) a portion of which contributes to this theme.
CYP CMHWB receives annual funding, the £360,000 for financial year 2023-24 is allocated, there is no official confirmation of funding
for 2024-25 but we remain hopeful that with the implementation of the delivery plan associated with the revised Mental Health Strategy
that this work remains a Scottish Government priority. 
2. Intended impact To address some of the key drivers of poor mental wellbeing - in relation to Cost of Living crisis, to address financial insecurity.
Empowering local communities to deliver a wide range of events, activities and interventions that support positive mental health and
wellbeing across North Ayrshire. 
To ensure children, young people and families have access to supports and services for MHWB at the time and place of need. 
3. Progress to date
against
milestones,
including
expenditure
Contribution to Community Mental Health and Wellbeing 
Scottish Government gave Arran Community & Voluntary Service (CVS) responsibility for the distribution of the National Community
Mental Health and Wellbeing Fund developed a robust application and assessment process involving staff from across the Community
Planning Partnership (CPP) and individuals with lived experience. The fund was heavily oversubscribed and the £307k was allocated
in partnership with Arran CVS to allow more applications to be funded. 
In financial year 2022-23 the CYP CMHWB contributed an additional £33,000 to the Adult CMHWB Fund to deliver projects which
targeted support for children, young people and families This was allocated to 7 grass roots 3rd Sector organisations who have a
delivered a range of programmes which have engaged with children, young people and families. 
Health and Wellbeing
125

Page 126

29 
The link between poverty and poor mental wellbeing continues to be an area of concern with 45% of our children and young people
living in postcodes in the most deprived areas of Scotland, according to SIMD. In collaboration with Money Matters, we have invested
(£20,000) in a Welfare Rights Officer across our 9 Secondary establishments. 
£25,000 was allocated to the Children and Familes teams to and 71 children, young people and families have benefited from co-
produced bespoke supports which have had a positive impact on mental wellbeing. Examples of referral reasons for support include:
family relationships / home issues, poverty / homelessness and trauma, with many children and young people experiencing multiple
barriers to positive wellbeing. 22 of these families reported being impacted by poverty and/or homelessness. 
£23,500 contributes to the Family Centred Wellbeing Support Service, which provides families in the Irvine and Three Towns area with
holistic family support which includes practical support to address financial insecurity. In the 6-month period to June 2023 this team
supported 3 new family referrals.  Reasons for engagement included 10 families impacted by poverty with 16 being referred on to
support from Money Matters. 
4. What difference
has the
investment
made? 
Contribution to Community Mental Health and Wellbeing 
The £307k formed part of a combined budget of £813,346k which was allocated to a total of 55 groups over 61 projects.
The investment from CYP CMHWB has allowed 4740 children and young people and 742 family members to access early intervention
programmes in their community for positive mental health and wellbeing or emotional distress. 
Community Support for Mental Health
The £75k formed part of a combined budget of £813,346k was allocated to a total of 55 groups over 61 projects. 
CYPCMHWB
Impacts noted by the Third Sector organisations include: 
• Reduction in isolation
• Increased confidence to engage with wellbeing supports. 
Many of the projects involved improving access to food, with breakfast clubs and Sunday lunches alongside support to cook on a
budget. 
This school session August 2022 – June 2023 saw financial gains of £572,060 for our families, as a direct result of engagement with
the schools’ Welfare Rights Officer. 
The Children and Families accessing the bespoke funding report improvements in their overall family wellbeing. Some of the examples
of what the funding was used for include providing some fun days out for families who have all experienced some form of
trauma/disruption to their lives; and the purchase of garden play equipment to promote healthier lifestyles and provide ongoing
facilities to families to enjoy time together. It has been reported by many social work staff that families are relieved and delighted that
126

Page 127

30 
they are able to take their children out and have fun together as a family. Families have also reported the positive impact that this fund
is non stigmatising and allows them dignity to make choices. 
Impacts noted through engagement with the Family Centred Wellbeing Support Service are widespread. Service users have provided
detail that the service meets their needs and have found the non-judgemental support particularly helpful. 
5. Next steps and
timescales
Contribution to Community Mental Health and Wellbeing 
As we approach the one-year milestone since allocations were made Arran CVS are carrying out the evaluations of the projects.  The
next round of the Community Mental Health and Wellbeing Fund has just launched and again CPP partners are involved in the
process to maximise impact and share local knowledge and experience. 
Community Support for Mental Health
It is planned to further expand the work of the Family Centred Wellbeing Support Service across the whole of the authority through
utilising a portion of the Whole Family Wellbeing Fund. 
6. Comments Contribution to Community Mental Health and Wellbeing 
Using the established process made the spend quick and effective with money getting to the local groups quickly and via a single
application process.  It allowed the available money to be combined for maximum impact. 
Community Support for Mental Health
CYP CMHWB
We continue to report 6 monthly to the Scottish Government. They have highlighted two of our projects, (Welfare Rights Officer in
Schools and Project Delivery Officers) as examples of best practice and we have been approached by other local authorities to share
experiences and provide guidance. 
The collaboration with the Adult CMHWB is seen as a good example of using innovative ways to address the wider environmental and
community drivers of poor mental wellbeing.   
127

Page 128

31 
Supporting the Resilience of Local Businesses (COMPLETE)
1. Description of
funding stream,
date and amount 
Although not specifically allocated as part of cost-of-living, funds associated with supporting business have been redirected to focus on
sustainability, capacity building and resilience. 
Key funding that has been redirected: European Regional Development Fund (ERDF) £300k. 
2. Intended impact Agreement with Scottish Government to waive restrictions on European Regional Development Fund from Growth.  This initially was in
response to pandemic however given cost-of-living crisis flexibility remains to support resilience of business base. 
Small and Medium-sized Enterprises (SMEs) form the cornerstone of NA economy and given make up recruit locally.  Support to keep
business sustainable and competitive allows for continued employment and helps alleviate potential increases in redundancy/poverty. 
It is also noted that cost-of-living has significantly increased cost impacts for most businesses including utilities, supply chains etc. 
3. Progress to date
against
milestones,
including
expenditure 
Over 1000 businesses have been supported and a further 260new businesses have received support to start up.
4. What difference
has the
investment
made? 
550 jobs have been safeguarded and a further 118 new jobs have been filled with support from Business Development (BD).
Building capacity and sustainability has focused on new ways of working, cost control, implementation of digital technologies. 
Outputs: 
259 businesses have been supported to reduce carbon impact.
370 businesses have been supported to enhance digital capability.
135 instances of specialist consultancy provided to business.
Helped secure over £900,000 from external providers for businesses. 
5. Next steps and
timescales  ERDF funding has now come to an end.
Business and community including transport to work
128

Page 129

32 
6. Comments  N/A 
Review and Improve Support for Childminders and Out of School Clubs (OOSC) Providers
1. Description of
funding stream,
date and amount 
Review and improve support for childminders and OOSC providers 
Fund - North Ayrshire COVID Economic Recovery Fund - SG Funding: £0.126m. 
Targeted employability opportunities for key families during Summer 2022 
Fund - North Ayrshire COVID Economic Recovery Fund - SG Funding: £0.050m. 
Date awarded – June 2022 
2. Intended impact Review and improve support for childminders and OOSC providers  
By the end of this parliament Scottish Government has committed to ensure provision of wrap around childcare for families who need
it.  Use of childcare has changed significantly because of COVID-19.  OOSC providers face a particularly unstable business
environment.  Reduced use of OOSC services during lockdown and changed working patterns provide an opportunity to assess future
demand and support the sector to ensure the local availability of services in line with Scottish Government’s expectations.  The specific
needs of the vulnerable children, kinship care and our island communities will also be considered a spart of this work.  
Targeted employability opportunities for key families during Summer 2022 
Parents and carers with school age children will be encouraged to undertake a variety of short courses that upskill or lead to a route
into employment.  Build relationships between the Employability Team and participants, whilst building up confidence in the use of
childcare services. 
3. Progress to date
against
milestones,
including
expenditure
Review and improve support for childminders and OOSC providers  
The Cost-of-Living Mini Enquiry focussing on Childcare was held in Ardeer Community Centre on 25th May and the feedback from the
event assisted in shaping a role profile for an officer to ensure the impact of the work meets local needs. Discussions have taken place
with relevant officers and a draft Terms of Reference developed for a short life working group to guide this work.
Outputs of work relating to childminding on Arran has been requested by the Scottish Childminding Association. 
Targeted employability opportunities for key families during Summer 2022 
This work continues to progress with a group of 10 parents in the Auchenharvie Cluster. A strong partnership is in place between
Employability, Information and Culture, Ayrshire College and the local childcare providers.  
4. What difference
has the
investment
made? 
Review and improve support for childminders and OOSC providers 
Too early to assess however, the Cost of Living Mini Enquiry focussing on Childcare has provided clear guidance for this work. 
Targeted employability opportunities for key families during Summer 2022 
Ongoing – full assessment / evaluation will be carried out with participants and partners at the end of the funding however early
evaluations have been very positive with short videos made with participants sharing the positive experience and outcomes. 
129

Page 130

33 
5. Next steps and
timescales
Review and improve support for childminders and OOSC providers 
The Scottish Government's School Age Childcare Delivery Framework and School Age Childcare: National Children's Charter was
formally launched at the end of September 2023 and will be reviewed as part of this work to ensure that our work is in keeping with the
national direction of travel. 
Targeted employability opportunities for key families during Summer 2022 
Finish delivery as planned. 
Carry out full assessment / evaluation with participants and partners.
6. Concluding
comments
Review and improve support for childminders and OOSC providers 
The fluctuating situation relating to childcare services across North Ayrshire continues with most services remaining in a fragile
position. This work will greatly assist with sustainability and availability. 
North Ayrshire Council was successful in securing an award of £99k from the Scottish Government to assist with Capital Investment in
the school estate venues used by school aged childcare. This is being implemented in Whitehirst Park, Glencairn, Stanley, Mayfield
Primary Schools with a focus on outdoor play and learning.   
130

Page 131

34 
Public Transport Travel Scheme (COMPLETE)
1. Description of
funding stream,
date and amount 
Public Transport Travel Scheme
NAC Economic Covid Recovery Funding
Approved by Cabinet 7 June 2022 and subsequent Audit and Scrutiny Committee on 20 June 2022: £20,000. 
An additional £28,000 from Transport Scotland’s Smarter Choices Smarter Places fund was used to extend the reach of the scheme. 
2. Intended impact The scheme contributed to the principles of the Recovery Fund and Child Poverty Action Plan. This scheme provided support to low-
income households and individuals returning to work with free access to public transport for a fixed three-month period.   
3. Progress to date
against
milestones,
including
expenditure
A total of £48,000 was invested in the scheme to provide 218 individuals with three months of free public transport travel via
Strathclyde Partnership for Transport (SPT) ZoneCards and Stagecoach bus travel passes. 
The scheme provided three months of free access to bus or rail travel. Beneficiaries were also supported with a free personalised
travel plan to identify the best travel option for them. This supports low-income households, access to employment, address transport
poverty and build confidence in public transport post COVID-19.  Due to the nature of the travel cards this also benefitted beneficiaries
for both work and their personal life as they could be used at evenings/weekends.  They could also be used alongside other
concessionary travel schemes including the: 
• Young Person’s Free Bus Travel Scheme which allows children and young people under 22 free bus travel;
• Kids for a Quid rail scheme allows children to travel for £1 alongside an adult traveller, for up to four children; and   
• Concessionary travel scheme for disabled people and those over 60 years of age. 
The Active Travel and Transport Team worked with the Council’s Employability team and the Community Enterprise in Scotland
(CEIS) to identify beneficiaries. CEIS is a social enterprise agency who deliver a range of services including employability, employer
engagement, recruitment, and retention services.  This includes workforce development services, community engagement and
capacity building, skills and training services and community regeneration services. 
Once beneficiaries were identified, the team prepared a personalised travel plan for each individual to work out the best public
transport ticket solution for them.  Thereafter the individual was provided with the most appropriate ticket for the three-month period.
Pre and post intervention surveys were undertaken with beneficiaries. 
4. What difference
has the
investment
made? 
A total of £48,000 was invested in the scheme to provide 218 individuals with three months of free public transport travel via
Strathclyde Partnership for Transport (SPT) ZoneCards and Stagecoach bus travel passes. 
A sample of responses from participants is included below to illustrate the positive impact the scheme had. 
• “I was able to support my dad when he was attending hospital by using the bus to Crosshouse”
131

Page 132

35 
• “Made it easier for me to go to interviews and appointments”
• “Made it easier to attend my job centre appointments as well as hospital appointments.”
• “It saved me money.”
• “It’s been great for me, I have been using it to attend work and the nursery run”
• “It has been a massive help as I use the bus daily with 4 kids at home, not having the extra expense for the bus has helped a lot.”
• “It’s been great because I have been out a lot more with my kids.”
• “Helped with travel to and from job centre, everyday appointments and shopping.”
• “Been amazing, I have been able to save £13.10 a week.”
• “Good impact and with having a physical disability this has been really helpful.”
• “Made life easier.” 
5. Next steps and
timescales 
The funding for the scheme has now come to an end however opportunities to replicate it in future will continue to be investigated. 
Free travel and transport advice however is available to all North Ayrshire residents on an ongoing basis under the Travel Smart and
Trinity Active Travel Hub activities. 
6. Comments The scheme directly benefitted low-income households by reducing the impact of travel costs on household budgets and helping to
address transport poverty. This improved access to employment opportunities and helped sustain employment. It also helped to build
confidence in the public transport network post-pandemic and support sustainable travel for everyday journeys. 
The mode of transport was tailored to individual beneficiaries’ needs and both bus and rail travel solutions were facilitated across
North Ayrshire. 
Community Transport Initiative 
7. Description of
funding stream,
date and amount 
Community transport initiative 
At the Council budget of 1/3/23, the Early Intervention Fund – Child Poverty and Cost of Living, a one-off investment of £1.4m over 3
years, included provision of £100k for a exploration of a community transport initiative. 
8. Intended impact The initiative aims to explore the use of Council vehicles to support the needs of communities where access to transport at certain
times of day is a barrier to accessing services and opportunities.
9. Progress to date
against
milestones,
including
expenditure
Pilots are being developed and tested to identify appropriate interventions which meet community needs.
132

Page 133

36 
10. What
difference has
the investment
made? 
Future report
11. Next steps
and timescales 
Future report
12. Comments 
133

Page 134

37 
Support for communities (COMPLETE)
1) Description of
funding stream,
date and amount. 
Additional core hours to support opening of Community centres to accommodate activities associated with isolation and
financial insecurity
Fund: Tackling Financial Insecurities Funding 2021/22: £0.005m.
Date allocated- 29/11/21
Community Books 
Fund: Tackling Financial Insecurity Funding 2021/22: £0.022m.
Date allocated - 29/11/21
Third sector support for programmes to support low-income families and individuals by building on current programmes
Fund: North Ayrshire COVID Economic Recovery Fund – Scottish Government: £0.114m.
Date allocated – 7/6/22 
2) Intended impact Additional core hours to support opening of Community centres to accommodate activities associated with
isolation/financial insecurity
This funding allows local community centres to be open longer in order to accommodate/offer a wider range of activities aimed at
alleviating the effects of social isolation and delivering activities to contribute to positive mental health.
Community Books 
Funding to establish the base/platform on which the local Community Books will be hosted.  This resource will allow staff and
community leaders access to a wide range of information relating to resources available in the local area.  This will in turn assist with
enquiries from citizens seeking help and advice. 
Third sector support for programmes to support low-income families and individuals by building on current programmes
Work with the third sector support for programmes to support low-income families and individuals by building on current programmes
such as Out and About, working with families and key groups to improve access to food and environmental opportunities locally,
including through the Fairer Food network and Eglinton Garden Project, to develop skills to grow and cook food and, through family
sessions and activities, build ongoing individual and community capacity.  These sessions will encourage people to engage with the
local environment to support mental health and wellbeing and to develop parenting skills, family bonding, relationships, volunteering,
and employability in a supportive environment. 
Support for Communities
134

Page 135

38 
3) Progress to date
against
milestones,
including
expenditure
Additional core hours to support opening of Community centres to accommodate activities associated with
isolation/financial insecurity
The funding is fully committed for spend via third sector partners with service level agreements.
Community Books 
Work has now begun to develop and implement a new online Community Book solution via the CPP website using an integrated
ALISS database and North Ayrshire branded front end. 
Third sector support for programmes to support low-income families and individuals by building on current programmes
There will be a ‘test and learn’ trial in one locality over a year, which will establish impact and provide data and evidence for future
service design and external funding bids.  The initiative will link to the Love Local voucher scheme which will support local businesses.
A pilot is planned for Ardrossan with the aspiration to widen to the Three Towns in 2023. 
4) What difference
has the
investment
made? 
Additional core hours to support opening of Community centres to accommodate activities associated with
isolation/financial insecurity
Longer opening hours are available in some community centres.
Community Books
6 community books and 6 thematic Cost-of-living Crisis community books are live on the Community Planning Partnership webpages -
http://northayrshire.community/communitysupport/ while the new online solution is developed. 
Third sector support for programmes to support low -income families and individuals by building on current programmes
A pilot is being designed. 
5) Next steps and
timescales
Additional core hours to support opening of Community centres to accommodate activities associated with isolation
/financial insecurity
Funding fully allocated – non-recurring. 
Community Books
The platform for the new online Community Book solution will be an open data online directory using ALISS (A Local Information
System for Scotland) with a North Ayrshire branded front end. This will have the capability to be updated by staff, partners, and
community members with options to search for support and services by locality and walking distance.  The aim is to have it in a pilot
form by the end of the calendar year. A temporary fix is still in place on the CPP web site while work is completed. 
Third sector support for programmes to support low-income families and individuals by building on current programmes
Staff continue to work with partners to develop an inclusive model that fulfils the outcomes.  This will be set for delivery across Three
Towns from Easter 2023 for 12 months with focussed pieces of work during school holidays.   
6) Comments  Support is also provided for communities through the Fairer Food network and community grants, including Community Investment
Fund (CIF). 
135

Page 136

39 
Islands Emergency Cost-of-Living Fund
1) Description of
funding stream,
date and amount. 
The Islands Cost Crisis Emergency Fund represents an additional £1.4 million investment
from Scottish Government: 
£1.1 million resource 
Purpose:  Funding allocation 
EnergySmart (existing service which supports energy efficiency measures in homes and
crisis grants). In addition, £5,000 will also be contributed from Covid Recovery funding for
this service.
Progress
EnergySmart is now being targeted to our islands conjunction with the Council’s Area 
Based Scheme. While the Area Based Scheme contractor is on the Islands, all available
funding streams are to be promoted/maximised - Energy Smart, ECO4 Flex, ECO- Great
British Insulation Scheme, Home Energy Scotland’s grant and loan scheme, Warmer
Homes Scotland and hopefully an able-to-pay scheme. 
12 applicants have benefitted from £3100 on Arran
16 applicants have benefitted from £4350 on Cumbrae.       
£10,000
Money Matters (existing service which supports Welfare Rights
assistance/representation to North Ayrshire residents to ensure they receive their legal
entitlement to state benefits). In addition, £5,000 will also be contributed from Covid
Recovery funding for this service. 
Since the 3rd July (Arran) and 26th July (Millport), due to the additional Islands funding, we
work in partnership with the Arran and Millport GP Surgeries, with one Income Adviser
covering both islands. To date the adviser has received 21 referrals from Arran and 4 from
Millport GP Surgeries. The GP Surgeries stats are not included in stats to MM referred to
above. 
Progress
Since December 2022 there have been: 
• 65 referrals to Money Matters on Arran
• 31 referrals to Money Matters on Cumbrae. 
£10,000
136

Page 137

40 
The Welfare Reform Advice Team has received 6 referrals for the islands from December
2022. 
Schools 
Progress 
Brodick/Corrie/Kilmory/Pirnmill/Shiskine/Whiting Bay, Primary Schools and EYCs
£15,000 (total) 
• Simon Lamb poet workshops for cluster schools: 250 children benefitted from this.
• Free fruit for all: universal rather than targeted; many children took fruit every day and
families and parent councils have reacted positively to this.  Kilmory Parent Council
have asked for the cost breakdown to evaluate it to consider if it is something they
would run themselves for Kilmory.
• Future funding could be used to continue to provide fruit, reduce the cost of swimming
lessons and trips. 
Cumbrae PS 
• Offering experiences which would have been unaffordable for families and beyond our
school budget capacity.
• Booking 2 literature sessions for an author and an illustrator to work with children
across the school to further develop a love for books.
• Two whole school trips - the sea life centre at Loch Lomond and Kelvingrove 
• P6/7 trip to the Hunterian museum.
• The funds are much appreciated and 40 families have benefitted. 
Largs Academy 
Largs Academy is using the island fund to get licenses for the next year to two online
learning resources to support island pupils access high quality resources if there are
issues in getting to school and to counter the lack of available tutors on the island. 
These are: 
Britannica Library (£1600)
The authoritative information resource portal enables pupils to strengthen independent
research skills literacy and source inquiry (across all curricula subjects) as a basis to instil
£28,000
137

Page 138

41 
independent learning. As a school library subscription-based resource, pupils can login to
Britannica using their library card user-number – allowing for 24/7 remote online access
(including off campus) across personal mobile and electronic devices. Subscribing to
Britannica Library will be of particular benefit to Cumbrae based pupils (when unable to
attend the school campus in person) providing full-time (24/7) access to an authoritative
cross-curricular learning resource platform. Moreover, due to the island’s limited public
library opening hours – access to such a learning portal provides pupils with a continually
available digital library resource (running parallel with eBook provision). 
Achieve (£500)
Achieve is an online resource providing course overviews, resources and past papers with
answer schemes for every SQA course offered at Largs Academy. It is user-friendly and
allows pupil to access valuable resources when they are outside school. 
The remaining £900 will support our commitment to online (Teams) supported study and
school holiday sessions led by our staff that allow after school access to tuition for island
pupils. Feedback from Cumbrae pupils is that after school / holiday sessions can be harder
for them to access. For this reason, we offer specific supported study sessions on Teams
to support our range of learners. 
Third and voluntary sector groups on Arran and Cumbrae
Two mini-enquiries have been held on Arran and Cumbrae to identify key island
challenges in relation to the cost of living crisis. Key themes have been identified, with
potential mitigations which can be delivered locally, over and above the proposed support
(above) for energy and welfare rights advice. Connected Communities will contribute
£2,000 to the fund to provide a total allocation of £30,000 across the two islands.
Many island organisations benefitted from that fund (details reported to SG elsewhere).
During our island CoL mini-enquiries, the feedback from groups requested that we give
groups time to plan activities for the autumn and winter and they will now have the
opportunity to submit proposals for this fund. 
The Community Grants went live on the 28th September 2023 with a simple application
form developed specifically for the fund. The form and further information can be accessed
via the Arran CVS web site. A panel of individuals have been identified to carry out the
scoring and assessment processes. The fund will close on the 10 November. There are 4
criteria that applications have to meet. The criteria was developed form the collated
feedback form the Mini Enquiries:
• Supporting access to food with dignity  
138

Page 139

42 
• £300k capital 
This fund is being directly allocated to Local Authorities, through a 100% population formula as approved by the COSLA Settlement
Distribution Group and COSLA Leaders.  Allocations for are as North Ayrshire Council follows: 
Local Authority  Resource (£000) Capital (£000)
North Ayrshire Council 63 17 
A £57,000 Emergency Cost Crisis Funding allocation has been made for 2023-24. 
• Reuse and Recycle: assisting communities to live in a more sustainable and economic
way  
• Helping to tackle travel or transport-related issues so communities or individuals can
access services/resources that help ease the effects of the Cost-of-Living Crisis or  
• Target residents’ immediate needs and offer help to those who are struggling due to the
Cost of Living 
Applications should be in the region of between £50 and £5000 with any awards over
£1000 being seen as inspirational. 
2) Intended impact This has been developed to specifically recognise and tackle the challenges faced by island communities. 
Local Authorities responsible for islands should: 
● Use this funding to target island areas only;
● Use the funding to target immediate need and help those who are struggling due to the cost crisis; and
● Use the funding for existing schemes and/or other new support where they feel the need is greatest. 
3) Progress to date
against
milestones,
including
expenditure
There are already arrangements in place for energy efficiency, energy crisis support and welfare rights advice for residents and it is
proposed to use existing mechanisms to provide targeted support for islands communities. Schools have quickly identified potential
areas of spend which will mitigate cost of living challenges which particularly affect island communities. Mini-enquiries on child poverty
and the cost of living have recently been held on Arran and Cumbrae and key themes and potential mitigations have been identified. It
is proposed that local third and voluntary sector organisations will be funded to address locally identified challenges. The following
progress has been made: 
139

Page 140

43 
4) What difference
has the
investment
made? 
Future report
The deadline for applications for the Community Grants is 10 November 2023. We will work with a cross island Scoring Panel to
assess the applications and agree awards. 
5) Next steps and
timescales
Work with Arran CVS and Locality partnership chairs to allocate funding to voluntary and community groups to support local
communities. Officers will work collaboratively to look at possible options for more targeted work relating to fuel costs with a focus on
off grid supplies. The Child Poverty and Cost-of-Living Board has agreed to allocated further funds to the existing themes and to the 
third sector fund from the 2023-24 fund. 
6) Comments  N/A 
140

Page 141

44 
LiveWell Healthy Working Lives Programme 
1. Description of
funding stream,
date and amount 
LiveWell Healthy Working Lives Programme: £20k for 2022/23/24 (non-recurring funding)
2. Intended impact £20k of funding supports employee health and wellbeing through a programme of activities/events including a small grant fund.  The
Executive Leadership Team (ELT) allocates the funding which emphasises the importance of employee health and wellbeing within
the workplace.  The LiveWell Programme aims to breakdown some of the barriers that employees face when trying to improve their
health and wellbeing.  The LiveWell Programme aims to increase awareness of support and information, while wellbeing related
activities are made more accessible through reducing or negating the costs associated with participation.  This in turn improves
employee morale, wellbeing, engagement, and performance.   
3. Progress to date
against
milestones,
including
expenditure 
The LiveWell Programme has always taken an organic approach, with a framework of planned activities scheduled alongside ad hoc
opportunities.  This enables LiveWell to adapt quickly to new suggestions and ideas.  The Programme also provides small grants to
teams for health and wellbeing activities via our LiveWell Grant Scheme.  In Quarter 1 and Quarter 2 2023/24, £490 has been issued
to various teams to carry out wellbeing activities of their choice. 
Provision of funding from the ELT has allowed the LiveWell group to explore a wider range of activities than otherwise possible.  
During Quarter 1 and Quarter 2, £2100 was spent on wellbeing activities*. 
4. What difference
has the
investment
made? 
Information gathered from evaluations highlights the positive difference that the wellbeing activities are having, participant comments
include - 
“I am now equipped with effective techniques for relaxation, managing negative thoughts and look forward to putting them into practice
and making a daily part of my life.”  
“It’s given me the tools and tips to help me destress and reset whenever things start to become overwhelming”. 
“Class was great, not only for learning a new skill but chill time chatting with you and others after a busy day. Really enjoyed it”. 
I feel the benefit of having these tests and speaking to the girls. I was particularly concerned about cholesterol but I am now feeling
more positive and I am moving in the right direction. It’s great having the Boditrax app now too. Thank you for the appointment.”
Employee Wellbeing
141

Page 142

45 
Short evaluations are produced on activities by topic and have positive evaluations. 
• A limited number (100) of 3-month KA Leisure membership passes was offered to Council Employees, along with 200 7 Day family
passes to KA Leisure facilities;
• An Everyday Mindfulness Course was delivered to support employee mental wellbeing; 
• A Trauma Release Exercise (TRE) programme was delivered to support employee mental wellbeing;
• Two ‘Menopause Revive’ six week programmes, offering a mix of information and physical activity; and
• Employee Health Checks have been running at Cunninghame House, Building Services, St Matthews Academy and at Glebe Primary
school; further health checks days are being planned at various venues across North Ayrshire 
• In addition to activities a wide range of health promotion topics are promoted via the LiveWell SharePoint page, News in Brief and
LiveWell Facebook page.  These have included – ‘Self-care tips for unpaid Carers’ information was promoted on Connects, including
information on mental health, sleep, social connections, exercise and nutrition, and links to further sources of support (71 views)**;
Steps to LGBTQ+ Inclusion in the workplace’ was promoted on Connects, with suggestions for individuals and links to further sources
of support. (138 views); Mental Health benefits of talking to others (111), Maintaining Good Health as We Age (111); The Importance
of Social Connection for Health (53); Suicide Prevention Week (99). 
**views on the LiveWell Sharepoint page. 
Information promoted supporting the SaveWell theme included – 
• NAC Resourcing team emailed employees raising awareness of how to claim Child Benefits; and
• During June, Employee Perks raised awareness of the discounts that are available in major supermarkets such as Asda, Tesco,
Sainsburys, Iceland and M&S. In addition, employees could also access special summer offers on hotels and theme parks. The
Council’s free holiday school meals club was also promoted through the Employee Perks site. 
In addition to the LiveWell Programme of activities, the following support is being provided to employees. 
• Promotion of tax relief opportunities such as income tax marriage allowance, aligned to issue of P60 issue.  Laundry allowance and
professional membership fees;
• Promotion of government childcare support scheme;
• Pay advances for those transitioning into employment with us; 
• Promotion of credit unions particularly Scotwest Credit Union and all their promotions through webinars; and
• Employee discounts including supermarkets.  
142

Page 143

46 
5. Next steps and
timescales
Activities being planned in for Quarter 3 include – Mental Health Awareness session, Nutrition and Mental Health, Lifestyle Factors
Affecting Musculoskeletal Health, Menopause Awareness, Positive Mindset, Grief and Loss. Access to KA Leisure health checks will be
widened across North Ayrshire facilities and a range of physical activities promoted including free access to badminton and football
sessions. 
6. Comments A range of wellbeing activities continue to be planned and promoted throughout 2023/24. These are free at point of access for Council
employees (or heavily subsidised). The qualitative comments provided in the evaluation of activities highlight both the appreciation of
and the benefits obtained from participating in wellbeing activities.  Many employees would not access activities if they were not
promoted through the workplace. 
143

Page 144

144

Page 145

1 
NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Performance Information – Drug and Alcohol Services
- April 2022 to 31 March 2023 
Purpose:  To provide an update on the national and local drug and
alcohol related targets and standards and performance in
North Ayrshire.  To provide assurance to Members of the
performance, actions and service developments being
progressed to address the significant challenges for our
communities. 
Recommendation:  To note the update on performance and improvement
actions contained within the report. 
1. Executive Summary 
1.1   During 2022-23 all the following national and local drug and alcohol related
targets and standards were met:
• Access to Treatment’ waiting times
• Alcohol Brief Intervention delivery
• Substance Use treatment 
• Naloxone delivery 
1.2 Improvement actions were delivered in support of achieving new Medication
Assisted Treatment Standards (MAT).  North Ayrshire services devised and
implemented a wide reaching MAT Improvement Plan which enabled the
rollout and delivery of the MAT Standards across all localities.  A new national
benchmarking report was produced, which is currently being reviewed in order
to identify further improvements. 
1.3 National reports covering the year 2022 were published in relation to drug and
alcohol related deaths.  With regard to drug related deaths, there was a
decrease in numbers across Scotland with a slight decrease in numbers for
North Ayrshire.  With regard to alcohol related deaths, there was an increase
in numbers across Scotland with a decrease in numbers for North Ayrshire. 
Improvement actions were delivered in support of preventing both drug and
alcohol related deaths. 
Agenda Item 8
145

Page 146

2 
1.4 Improvement actions were also implemented to enable more individuals to
access residential rehabilitation support across North Ayrshire and Scotland
wide. 
2. Background 
2.1 ‘Access to treatment’ waiting times standards 
In order to promote the importance of individuals being able to access local
support timeously, a national standard is in place for individuals seeing help for
both for alcohol and drug related issues: 
• 90% of all clients referred to services will wait no longer than 3 weeks from
referral to appropriate alcohol treatment that supports their recovery
• 100% of Clients will wait no longer than 6 weeks from referral to appropriate
alcohol treatment that supports their recovery 
The same standard and measurements are also in place for individuals
seeking support for their drug use 
2.2 ‘Alcohol Brief Interventions’ standards for 2022-23 
In order to promote the importance of engaging with individuals to reflect on
their alcohol use and consider possible change, a national standard is in place
to ensure opportunistic discussions can take place across a variety of settings. 
The ‘Priority’ settings are primary care, A&E and ante-natal.  The ‘wider’
settings include partnership and local authority and 3rd sector services. 
• Target number of ABI’s to be delivered across Ayrshire and Arran within
‘priority’ settings – 3,419
• Target number of ABI’s to be delivered across Ayrshire and Arran within
‘wider’ settings – 855 
2.3 ‘Substance Use’ treatment target 
As part of their ‘National Mission’ the Scottish Government have created a new
‘Substance Use Treatment Target’ to increase the number of individuals being
supported in treatment. 
North Ayrshire has been set a target to increase numbers in treatment from
882 individuals in April 2020 to 959 individuals by March 2024. 
2.4 ‘Naloxone’ supply 
One of the key initiatives to prevent drug related deaths is to supply and
promote the use of ‘Naloxone’ (which is an opiate antidote which can
temporarily reverse the effects of an opiate overdose, providing more time for
an ambulance to be called and treatment to be administered). 
146

Page 147

3 
An improvement plan was created to promote the use of Naloxone and a local
target was set for 2022-23 for local services to supply, as a minimum, 420
Naloxone kits. 
2.5 Alcohol and drug related deaths 
Central to the ‘National Mission’ is the requirement to prevent alcohol and drug
related deaths.  Each and every drug-related death is a tragedy for those
involved and of great concern to all.  Services have implemented a range of
actions to prevent such deaths whilst also wishing to learn as much as possible
about the circumstances around each death and work closely with partners to
identify issues and any areas for improvement. 
The North Ayrshire Alcohol and Drug Partnership allows partners to come
together to implement actions aimed at preventing drug-related deaths. By
adopting a wider public health approach, with local people, services and
stakeholders, everyone can work together to tackle drug-related deaths. 
Each year the National Records of Scotland produce an annual report titled
‘Drug Related Deaths in Scotland 2022’.  A similar report is produced yearly
around alcohol related deaths. 
2.6 Residential Rehabilitation 
Another key element of the ‘National Mission’ is to increase access to
residential rehabilitation support.   
For residents of Ayrshire and Arran, Ward 5, Woodland View, is available for
hospital based detoxification support, shorter term rehabilitation support and
also offers a day attendance programme.    
In the last year the Scottish Government commissioned a new national service
specifically designed to support vulnerable families with young children.  This
facility, Harper House, is situated in Saltcoats and offers support to families
from across Scotland (with a local enhanced pathway of support available for
more vulnerable families from North Ayrshire). 
The ADP has also receive funding in the last year to ensure pathways in place
to support individuals to access longer term residential rehabilitation support
across Scotland 
2.7 Medication Assisted Treatment Standards 
As part of the ‘National Mission’ services have been tasked with delivering on
new Medication Assisted Treatment (MAT) Standards for Scotland with the
aim of improving access, choice and support for individuals. 
147

Page 148

4 
The term MAT is used to refer to the use of medication such as opioids,
together with any psychological and social support, in the treatment and care
of people who experience problems with their drug use.  The 10 current
standards are outlined below: 
• Standard 1: All people accessing services have the option to start MAT from
the same day of presentation.
• Standard 2: All people are supported to make an informed choice on what
medication to use for MAT, and the appropriate dose.
• Standard 3: All people at high risk of drug-related harm are proactively
identified and offered support to commence or continue MAT.
• Standard 4: All people are offered evidence based harm reduction at the
point of MAT delivery
• Standard 5: All people will receive support to remain in treatment for as long
as requested.
• Standard 6: The system that provides MAT is psychologically informed (tier
1); routinely delivers evidence-based low intensity psychosocial interventions
(tier 2); and supports individuals to grow social networks.
• Standard 7: All people have the option of MAT shared with Primary Care.
• Standard 8: All people have access to advocacy and support for housing,
welfare and income needs.
• Standard 9: All people with co-occurring drug use and mental health
difficulties can receive mental health care at the point of MAT delivery
• Standard 10: All people receive trauma informed care. 
Following a successful test of change pilot across North Ayrshire, an
Improvement Plan was agreed to assist in the delivery of the MAT standards with
a specific focus during 2022-23 on MAT standards 1 to 5. 
3. Proposals 
Performance Information 2022-23 
3.1 ‘Access to treatment’ waiting times standards 
Alcohol
• 90% of clients will wait no longer than 3 weeks from referral to appropriate
alcohol treatment that supports their recovery 
Quarter 1 Quarter 2 Quarter 3 Quarter 4
96% 98% 96% 96% 
• 100% of Clients will wait no longer than 6 weeks from referral to
appropriate alcohol treatment that supports their recovery 
Quarter 1 Quarter 2 Quarter 3 Quarter 4
100% 100% 100% 100% 
148

Page 149

5 
Drugs 
• 90% of clients will wait no longer than 3 weeks from referral to appropriate
drug treatment that supports their recovery 
Quarter 1 Quarter 2 Quarter 3 Quarter 4
94% 100% 100% 96% 
• 100% of Clients will wait no longer than 6 weeks from referral to
appropriate drug treatment that supports their recovery 
3.2 ‘Alcohol Brief Interventions’ standards for 2022/23 
Quarter 1 Quarter 2 Quarter 3 Quarter 4
100% 100% 100% 100% 
All waiting times standards were met during 2022 to 2023: 
3.3 ‘Substance Use’ treatment target 
North Ayrshire has been set a target to increase numbers in treatment from
882 individuals in April 2020 to 959 individuals by March 2024
.
149

Page 150

6 
As of March 2023, the numbers in treatment exceed the 2024 target.  Please
note the monthly information supplied is unpublished and has been collected
from local prescribing systems to monitor progress.  We await a verified
nationally published report. 
3.4 ‘Naloxone’ supply 
Against a local target of supplying 420 Naloxone kits during 2022 to 2023 - 846
kits were supplied across North Ayrshire.
51 lives across Ayrshire and Arran were reported to be saved through the use
of Naloxone during this period (31 in North Ayrshire).  Many lives saved via the
use of Naloxone go unreported
.
3.5 Alcohol and drug related deaths 
The National Records of Scotland recently produced its annual report titled
‘Drug Related Deaths in Scotland 2022’.  In 2022, there were 1,051 drug
misuse deaths registered in Scotland.  This was a decrease of 279 deaths
compared with 2021. This is the lowest number of drug misuse deaths since
2017. 
150

Page 151

7 
The change between 2021 and 2022 is the largest year on year decrease on
record.  Despite this recent fall, drug misuse deaths are still much more
common than they were in 2000. 
People in the most deprived areas of Scotland are almost 16 times as likely to
die from drug misuse compared to people in the least deprived areas. The
association of deprivation with drug misuse deaths is much greater than with
other causes of death.  Regrettably compared to other Local Authority areas,
North Ayrshire recorded the 4th highest drug deaths in 2022.  North Ayrshire is
an area with high levels of poverty and people living in relative deprivation, with
over 40% of people living in North Ayrshire living in areas considered to be
among the most deprived in Scotland, The HSCP alongside wider system
partners are dedicated to tackling the inequalities that many local people face. 
• For North Ayrshire, the number of drug related deaths in 2022 was 37 - a
reduction of 2 from the previous year. 
The recent National Records of Scotland Alcohol Specific Deaths 2022 report
illustrates a rise in deaths caused by alcohol.  This is the highest level of
alcohol related deaths in 14 years, with the figures showing that individuals in
the poorest communities were more than four times as likely to die as those in
the wealthiest areas. 
With regard to the Ayrshire & Arran Health Board area, there was a reduction
from 91 deaths in 2021 to 86 in 2022 (one of 5 Health Board’s to illustrate a
reduction). 
• North Ayrshire deaths reduced from 37 deaths in 2021 to 29 deaths in
2022
• East Ayrshire reduced from 30 to 28 deaths
• South Ayrshire increased from 24 to 29 deaths 
North Ayrshire council were one of 12 council areas to illustrate a reduction. 
In the last 4 years, the number of deaths in North Ayrshire has reduced yearly
from 50 deaths in 2019, to 44 deaths in 2020, to 37 deaths in 2021 to 29 deaths
last year 
3.6 Residential Rehabilitation 
Another key element of the ‘National Mission’ is to increase access to
residential rehabilitation support.   
Local hospital based support is provided in Ward 5, Woodland View, Irvine to
anyone who has an alcohol and/or drug problem and mental health issues. 
Ward 5 has 10 beds for residential care – offering local access to residential,
detoxification, rehabilitation and day attendance support. 
151

Page 152

8 
Seamless pathways of support are in place with the local community alcohol
and drug services to support individuals before, during and after their
placement (extra support in place for NA residents e.g. in addition to ongoing
NADARS support, everyone is also provided with daily follow up support from
the local Turning Point, Scotland, service for the first week following
discharge).
During 2022/23:                                                   
Detoxification support            Rehabilitation support 
Vulnerable families from North Ayrshire also have access to additional local
residential rehabilitation support.  The HSCP was instrumental in supporting
Phoenix Futures, Scotland, to open ‘Harper House’ in November 2022.  It is
located in Saltcoats & is a Care Inspectorate registered service, funded by the
Scottish Government.  It offers specialist support for the ‘whole family to
recover from the harms of problematic drug and alcohol use’.  Their family-
focused programme of interventions is ‘designed to benefit each member of
the family and the family unit as a whole’. 
Referrals are accepted from across Scotland, with enhanced local access
available for residents of North Ayrshire.  These pathways continue to be
improved with a local oversight group meeting regularly to support the
identification and suitability of families.  In the first 4 months of opening 4
families from NA have benefited from this support. 
Another development in late 2022 has been focused on providing access to
External Residential Rehabilitation with funding being made available by the
ADP.  Individuals wishing to access this support are now able to do so via
NADARS who will support the development of a care plan, identify a residential
rehabilitation provider, seek funding and then support individuals into, through
and after their ERR placement.   
By March 2022, four individuals had benefited from ERR.  Funding was
identified to appoint a ‘single point of contact’ who will lead on enabling
individuals and families to access local and external residential support
options.  A key priority is to build on the pathways created during the last year
to ensure more individuals and families are able to access this type of support. 
152

Page 153

9 
3.7 Medication Assisted Treatment Standards 
As part of the ‘National Mission’ services have been tasked with delivering on
new Medication Assisted Treatment (MAT) Standards for Scotland with the
aim of improving access, choice and support for individuals. 
An evaluation of an initial test of change pilot demonstrated that MAT delivery
could be undertaken safely and with positive recovery outcomes. It was agreed
to expand MAT availability during 2022-23 – to ensure MAT was available
across all of North Ayrshire and Arran to prioritised groups due to vulnerability
in relation to risk.
An Improvement Implementation Plan, approved by Chief Executives, was
implemented, evaluated & updated with regular progress reports submitted to
the Scottish Government alongside quarterly update reports being sent to the
national MAT support Team – ‘MIST’.
• MAT availability was increased at Caley court to 3 days per week & ‘drop
in’ access and then ultimately expanded to 5 days a week with extended
hours.
• Locations identified across NA Localities for MAT access closer to home
– ultimately MAT is now available across all 6 NA Localities with immediate
support available to all from Caley Court alongside ‘low threshold’ access
in rural areas. 
• An explicit delivery plan was put in place for delivering trauma informed
practice, LOPs, SOPs, guidelines & clinical & care pathways of support
were all implemented.
• National and local ADP funding was secured for additional staff which
includes: Consultant Psychiatry, Additional prescribing capacity; Addiction
Workers; Nursing staff; Support Workers; Recovery Development Workers
(lived experience) 
Priorities for 2023/24 include: 
• Sustain MAT delivery across MAT Standards 1 to 5;
• Identify key actions to implement MAT Standards 6 to 10 (once national
reporting requirements are clarified);
• Improve the gathering of experiential data for SG reporting and to identify
further improvement actions
• Create a clear vision, model and process to implement MAT Standard 7
(this relates specifically to primary care involvement in MAT delivery) 
Funding issue in relation to delivery of MAT Standard 7 
With no additional funding being made available, and whilst awaiting outcomes
of national and local funding discussions, the North Ayrshire Alcohol & Drug
Partnership (ADP) allocated non-recurring funding of £89k a year to initiate, at
pace, proposed developments in North Ayrshire.  This funding will be used to
153

Page 154

10 
employ additional specialist GP and Pharmacist prescribers and to initiate a
test of change involving local pharmacies administering Buvidal (an OST
medication). 
In April 2023, NHS Boards received a letter from the Scottish Government
which identifies that funding for MAT 7 developments should be extracted from
the funding already allocated through the Primary Medical Services funding for
Enhanced Services. This creates an issue for services to unpick previous
commitments which would enable shifting resource to meet the MAT 7
commitment that ‘All people have the option of MAT shared with Primary Care’. 
National and local discussions are ongoing to find a resolution. 
Rating of MAT initiation: 
A RAGB self-assessment was completed and evidence (numerical,
experiential and process information) was submitted to the MIST team for
analysis and benchmarking. The table below highlights a very positive final
RAGB score for the implementation of MAT standards 1 - 10 across North
Ayrshire at the end of March 2023.     
154

Page 155

11 
4. Implications/Socio-economic Duty 
Financial 
4.1 The ADP has been provided with some non-recurring funding to support
access to external residential rehabilitation support.  It is unknown if this
funding will be sufficient to meet future demand. 
Funding will require to be identified to implement the MAT Standards in full
especially in relation to MAT Standard 7 which will require the support of
primary care colleagues. 
Human Resources 
4.2 None 
Legal 
4.3 None 
Equality/Socio-economic 
4.4 The majority of people at risk of drug and alcohol related deaths are among
the most marginalised and disadvantaged in our population.  Many of those
people experience significant disadvantage of opportunity and poorer health
outcomes.  The work of the North Ayrshire ADP and delivery priorities of
NADARS progresses and strengthens prevention. The necessary work
through our ADP, HSCP, NHS Board and NAC and wider partners contributes
to effective means of preventing drug-related deaths.
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 The information contained within this report and the improvement actions that
have been implemented have a positive contribution to play in support of one
of the Councils key themes:  
• Wellbeing (we will address health inequalities, promote children and young
people’s wellbeing and enable community wellbeing) 
Community Wealth Building 
4.7 None 
155

Page 156

12 
5. Consultation 
5.1 This report notes the significant collaboration and engagement underway both
nationally and locally across the health and social care system to prevent
alcohol and drug related deaths and to ensure that all standards and targets
are met. 
Caroline Cameron
Director - North Ayrshire Health and Social Care Partnership 
For further information please contact Peter McArthur, Senior Manager –
Addiction Services, on 01294 317840. 
Background Papers
0
156

Page 157

Performance
management report
NORTH AYRSHIRE HEALTH
AND SOCIAL CARE
PARTNERSHIP & ADP
April 2022 - March 2023
Prepared by Denise Brown
Prevention and Service Support Team  
Alcohol and drug related information
On target
Achieved
Not achieved
157

Page 158

158

Page 159

Substance Use Treatment Target
The Scottish Government have created a new ‘Substance Use Treatment Target’ to increase the number of
individuals being supported in treatment.
North Ayrshire has been set a target to increase numbers in treatment from 882 individuals in April 2020 to
959 individuals by March 2024.
Baseline from Scottish Government
Target by 2024 by Scottish Goverment
2022/2023 Financial Year
Interventions are in place across our community
alcohol and drug recovery services to support the
achievement of this target by the due date of April
2024. Please note the monthly information supplied
is unpublished and has been collected from local
prescribing systems to monitor progress, however,
we await an initial verified nationally published
report.
159

Page 160

160

Page 161

161

Page 162

162

Page 163

Ayrshire and Arran
Drug related deaths information
ANNUAL SUMMARY
1st April 2022- 31st March 2023
Published confirmed deaths (Extracted from National Records of Scotland Drug Related
Deaths in Scotland, 2021)
Number of deaths confirmed
2017
2018
2019
2020
24
29
41
36
25
38
41
39
12
15
26
31
61
82
108
106
EAST NORTH SOUTH TOTAL
2021 38 39 23 100
Number of NADARS reviews conducted for individuals identified as potentially
suffering a drug related death
27
Number of these reviews which identified learning or recommendations 3
Number of reports submitted by other services which identified learning or
recommendations 0
2022/23- no confirmed published information as yet
National Records for Scotland - Drug Related Deaths
Please find information in the link below around the definition of drug related deaths and what
deaths are excluded from this definition:
https://www.nrscotland.gov.uk/files/statistics/drug-related-deaths/drd2016/html/drug-related-deaths-
2016-annex-a.html
The link below details the full report which details statistics of drug-related deaths in 2021 and
earlier years, broken down by age, sex, substances implicated in the death, underlying cause of
death and NHS Board and Council.
https://www.nrscotland.gov.uk/files//statistics/drug-related-deaths/21/drug-related-deaths-21-
report.pdf
Review and update of Drug Notification Process Local Operating Procedure
Effective record keeping
Regularity of review and continuity of support when keyworker was not available
In the last year, local learning identified from reviews were:
163

Page 164

164

Page 165

165

Page 166

166

Page 167

MAT availability was increased at Caley court to 3 days per week & ‘drop in’ access - and then
ultimately expanded to 5 days a week with extended hours.
Locations identified across NA Localities for MAT access closer to home – ultimately MAT is now
available across all 6 NA Localities with immediate support available to all from Caley Court
alongside ‘low threshold’ access in rural areas.
An explicit delivery plan was put in place for delivering trauma informed practise;
LOPs, SOPs, guidelines & clinical & care pathways of support were put in place
Consultant Psychiatry, Additional prescribing capacity; Addiction Workers; Nursing staff; Support
Workers; Recovery Development Workers (lived experience)
MAT 7 – Primary Care (GP & Pharmacy) involvement. Vision, model & process agreed. SG recently
Ring Fenced funding for this. LES to be offered to GPs.
In addition MAT availability to be expanded to include Prison and Police Custody.
An Improvement Implementation Plan, approved by Chief Executives, was implemented, evaluated &
updated with regular progress reports submitted to the Scottish Government alongside quarterly
update reports being sent to the national MAT support Team – ‘MIST’.
National and local ADP funding was secured for additional staff which includes:
Priorities for 2023/24 include:
A RAGB self-assessment was completed and evidence (numerical, experiential and process
information) was submitted to the MIST team for analysis and benchmarking. The table below
highlights a very positive final RAGB score for the implementation of MAT standards 1 - 10 across
North Ayrshire.
Implementation of MAT standards
within North Ayrshire
A pilot test of change evaluation was carried out within the Three Towns Area of North
Ayrshire.  By March 2022, results demonstrated that MAT delivery could be undertaken
safely and with positive recovery outcomes throughout North Ayrshire.
An evaluation of an initial test of change pilot demonstrated that MAT delivery could be
undertaken safely and with positive recovery outcomes. It was agreed to expand MAT
availability during 2022/23 – to ensure MAT was available across all of North Ayrshire and
Arran to prioritised groups due to vulnerability in relation to risk.
167

Page 168

Access to residential rehabilitation across Ayrshire and Arran - Ward 5
Local residential rehabilitation support is provided in Ward 5, Woodland View to anyone who has an
alcohol and/or drug problem and mental health issues. 
Ward 5 has 10 beds for residential care:
Seamless pathways of support are in place with the local community team supporting individuals
before, during and after their placement (extra support in place for NA residents e.g. in addition to
ongoing NADARS support, everyone is also provided with daily follow up support from the PEAR
service for the first week following discharge).
During 2022/23:
Access to additional local residential rehabilitation – Harper House
The NA H&SCP was instrumental in supporting Phoenix Futures, Scotland, to open ‘Harper House’ in
November 2022.  It is located in Saltcoats & is a Care Inspectorate registered service, funded by the
Scottish Government – it offers specialist support for the ‘whole family to recover from the harms of
problematic  drug and alcohol use’.  Their family-focused programme of interventions is ‘designed to
benefit each member of the family and the family unit as a whole’.  Referrals are accepted from across
Scotland, with enhanced local access available for residents of North Ayrshire.  These pathways
continue to be improved with a local oversight group meeting regularly to support the identification
and suitability of families.  In the first 4 months of opening 4 families from NA have benefited from 
this support. 
Access to External Residential Rehabilitation (ERR)
Individuals wishing to access external residential rehabilitation support can do so via NADARS
who will support the development of a care plan, identify a residential rehabilitation provider,
seek funding and then support individuals into, through and after their external residential
rehabilitation placement.  In quarter 4, 4 indiviudals have been supported in to ERR.
Residential Rehabilitation expansion   
Rehabilitation
55
Detoxification
143 individuals
(NA=84)
Detoxification support
67  individuals
(NA=41)
Rehabilitation support
168

Page 169

Financial information
ADP 22-23 Forecast Spend
169

Page 170

Additional funding streams
170

Page 171

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Capital Programme Performance to 31 August 2023 
Purpose:  To advise Cabinet of progress in delivering the Capital
Investment Programme 2023/24 to 31 August 2023. 
Recommendation:  That Cabinet agrees to:
(a)  note the revisions to budgets outlined in the report; 
(b)  note (i) the General Services and HRA revised budgets at 31
August 2023; and (ii) the forecast expenditure to 31 March
2024; and
(c) approve the virement proposals noted within the HRA
programme detailed in appendix 2. 
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2023/24 to 2030/31 was
approved by Council on 1 March 2023. The Housing Revenue Account (HRA) Capital
Investment Programme 2023/24 sits within the updated HRA Business Plan and was
approved by Council on 15 February 2023. 
1.2  This report identifies the current programme for 2023/24, taking account of
adjustments made to the initial budgets. The report presents the revised budgets at 31
August 2023 (Period 5) and forecast expenditure to 31 March 2024. 
1.3   At Period 5 the General Fund is forecasting a net underspend of (£0.018m) against a
revised budget of £105.832m. The HRA is forecasting a projected underspend of
(£0.686m) against a revised budget of £40.434m. 
1.4  Within the General Fund, adjustments to funding have resulted in net additions to the
overall capital programme of £0.668m, including Scottish Government funding in
relation to the Garrison House project and Dyemill Bike Park 
1.5 Reviews of individual project plans have identified a number of adjustments to the
current profiles. As a result, (£2.127m) has been reprofiled for delivery in 2024/25 and
beyond. This has been partly offset by the acceleration of £0.039m to 2023/24 from
future years. 
1.6 Within the HRA, a review of delivery timescales has identified a requirement to re-
profile (£19.349m) of works for delivery in 2024/25 and beyond. This is partly offset by
the acceleration of £0.128m to 2023/24 from future years. 
Agenda Item 9
171

Page 172

1.7 The major risk to the forecast position is the uncertainty arising from the ongoing
inflationary pressures, supply chain issues, which are impacting on tender returns and
the cost of materials, and continued increases in the cost of borrowing. Some
mitigation has been built into the programme to offset cost pressures and supplement
the Loans Fund. However, any further significant increase in costs will result in
increased borrowing requirements and may have a negative impact on the
deliverability of both the General Fund and HRA capital programmes for 2023/24 and
beyond. Projects will continue to be monitored closely with cost increases met initially
from the additional flexibility built into the programme. However, any requirement for
further borrowing not met from a funding source will be a matter for Council to
consider. 
2. Background 
General Fund 
2.1 The following table outlines the movements in the 2023/24 General Services budget: 
2.2 (a) Changes to Funding 
The capital programme has been updated to reflect the following changes to funding: 
2023/24
£m
Budget as at 30 June 2023 107.252   
a) Changes to Funding 0.668        
Revised Budget 107.920   
b) Alterations to phasing of projects:-
2023/24 to 2024/25 (2.127)           
2024/25 to 2023/24 0.039        
Budget as at 31 August 2023 105.832   
Funding Body Amount Project
Scottish Government £0.731m Garrison House Project
Scottish Government £0.221m Dyemill Bike Park
Cycle Scotland £0.011m Cycle Shelter
SUSTRANS £0.020m Kilbirnie to Kilwinning
SUSTRANS (£0.098m) Saltcoats Old Cal Railway Ph1 grant downturned
Transport Scotland (£0.093m) Low Carbon Hub - grant downturned
ERDF (£0.124m) Low Carbon Hub - grant downturned
Total £0.668m
172

Page 173

2.3 (b) Alterations to the Phasing of Projects 
A further review of individual project plans, taking cognisance of the current levels of
volatility within the construction sector, has identified a requirement to re-profile
(£2.127m) of works for delivery in 2024/25 and beyond: 
These adjustments have been partly offset by the acceleration of £0.039m of
expenditure to 2023/24 from future years. 
2.4 These adjustments have resulted in a revised 2023/24 budget at 31 August 2023 of
£105.832m. 
Service Amount Project
Chief Executives (£0.070m) ICT Investment Fund
(£0.050m) Telephony
(£0.120m)
Communities (£0.032m) West Kilbride PS UFSM
(£0.032m)
Place (£1.087m) VDLF - Kyle Road Phase 2
(£0.851m) Goldcraigs depot
(£0.672m) AGD - I3 Flexible Business Space Phase 1
(£0.500m) Islands Pit Stops
(£0.445m) Access Path Network Programme
(£0.432m) AGD - Marine Tourism Ardrossan
(£0.275m) Montgomerie Park Masterplan
(£0.250m) Repurposing Property Grant Fund
(£0.155m) AGD - I3 DPMC Phase 2
(£0.105m) AGD - I3 DPMC Phase 1
(£0.080m) AGD- Great Harbour
(£0.050m) PBIP 36 Bank Street
(£4.902m)
Corporate £2.927m Sensitivity Adjustment
£2.927m
Total (£2.127m)
Service Amount Project
Place £0.039m Minor Adjustments
£0.039m
Total £0.039m
173

Page 174

2.5 The following graph illustrates the movement in each programme on a service basis
compared to the revised programme: 
2.6  The impact on budgeted funding, elements of which are related to the profile of
expenditure reported above, is a reduction of £1.420m from the revised budget,
including: 
Category Amount Comments
Borrowing (£1.987m) Rephased aligned to projected expenditure
Capital Grants £3.001m Rephased and additional government grants
Other Grants £0.430m Rephased and revised contributions
Capital Receipts (£0.024m) Realigned capital receipts
Total £1.420m
18.349 0.799 0.757 93.126 2.900 115.931
21.681 0.892 2.265 107.802 (25.388) 107.252
22.099 0.771 2.265 102.971 (22.274) 105.832
3.750 (0.028) 1.508 9.845 (25.174) (10.099)
Approved Programme
Movement
Programme @ P5
Programme @ P3
174

Page 175

2.7 Projected Capital Expenditure to 31 March 2024 
The projections are summarised by service in the following table:   
2.8 An underspend of (£0.018m) is projected within the General Fund capital programme
for 2023/24 in relation to the Annick Primary Early Years Extension. These funds will
be transferred to the Flexibility budget to offset anticipated budget pressures
elsewhere in the programme. Information on the progress of all projects can be found
in Appendix 1. 
2.9 Although not formally reflected in the financial performance reports at this time due to
ongoing uncertainty, areas of cost risk have been identified as a result of cost volatility
arising from the ongoing inflationary pressures, outstanding contractor claims and
supply chain issues which are impacting on tender returns and the cost of materials
across a number of projects. Specific projects where cost risks have been identified,
or are anticipated, include Moorpark Primary, Montgomerie Park Primary, Ardrossan
Campus, Upper Garnock Flood Prevention Scheme, Millport Coastal Flood Prevention
Scheme, Largs Sea Wall, Ardrossan North Shore and Ardrossan Harbour
Interchange. While some mitigation has been built into the Capital Programme in the
form of flexibility budgets, totalling £10m over the next few years, cost pressures may
exceed this provision. These risks will be quantified as individual projects are
completed and tendering exercises are finalised, with the impact on the costs of the
programme being monitored and reported to Cabinet as appropriate. It is recognised
however, with a significant budget gap being forecast for 2024/25 and to limit any
additional unfunded borrowing, any costs in excess of the current level of flexibility
provision will require to be funded from existing resources. 
Revised
Budget
2023/24
Budget
Revisions
Carry
Forwards
and
Adjustments
Revised
Budget
2023/24
Projected
Expenditure
/ Income to
31 March
2024
Projected
Variance
Over /
(Under)
£m £m £m £m £m £m
Expenditure
Communities 21.681 - 0.418 22.099 22.081 (0.018)
Chief Executive 0.892 - (0.121) 0.771 0.771 -
Health and Social Care Partnership 2.265 - - 2.265 2.265 -
Place 107.566 0.766 (5.361) 102.971 102.971 -
Other including Flexibility (25.152) (0.098) 2.976 (22.274) (22.274) -
Total Expenditure 107.252 0.668 (2.088) 105.832 105.814 (0.018)
Income
General Capital Grant (34.336) - (34.336) (34.336) -
Specific Capital Grant (15.968) (0.952) 3.953 (12.967) (12.967) -
Capital Funded from Current Revenue (0.300) - (0.300) (0.300) -
Capital Receipts (0.473) (0.024) (0.497) (0.497) -
Other Grants & Contributions (4.532) 0.284 0.146 (4.102) (4.102) -
Prudential Borrowing (51.643) 0.024 (2.011) (53.630) (53.612) 0.018
Total Income (107.252) (0.668) 2.088 (105.832) (105.814) 0.018
175

Page 176

2.10 In addition to the risks identified in relation to individual projects, significant financing
risks continue to be identified in relation to the overall affordability of the capital
investment programme due to the increased cost of borrowing. As reported to Cabinet 
on 29 August 2023, the programme is currently affordable based on the estimated
funding streams and the actions agreed by Council to supplement the Loans Fund.
The ongoing cost risk will continue to be monitored and a full assessment of
affordability will be included in the next major review of the capital programme due for
completion during 2023/24. 
Housing Revenue Account 
2.11 The following table outlines the movements in the 2023/24 HRA Capital budget: 
2.12  (a) Alterations to the Phasing of Projects 
A review of the timescale for delivery of capital projects has identified a requirement to
re-profile (£19.349m) of works for delivery in 2024/25 and beyond, including: 
2023/24
£m
Budget as at 30 June 2023 59.655       
a) Alterations to phasing of projects:-
2023/24 to 2024/25 (19.349)           
2024/25 to 2023/24 0.128         
Budget as at 31 August 2023 40.434       
Category Amount Project
New Builds (£11.000m) Contingency
(£2.389m) Garnock Academy
(£1.548m) House Building General
(£0.800m) James Reid
(£0.720m) Montgomerie Park
(£0.450m) Kings Arms
(£0.300m) Stanecastle
(£0.150m) Laburnum Avenue / Newhouse Drive
(£0.050m) Fullarton Street
(£0.050m) James MacFarlane
(£17.457m)
176

Page 177

This has been partly offset by the acceleration of £0.128m of project expenditure for
delivery during 2023/24, including: 
2.13 These adjustments have resulted in a revised 2023/24 budget at 31 August 2023 of
£40.434m. 
2.14 The impact on budgeted funding is a reduction of £19.221m in the drawdown of
Capital Grants and reduced Prudential Borrowing aligned to the revised programme: 
Category Amount Project
Improvements (£0.186m) Window Replacement
(£0.155m) Electrical Rewiring
(£0.341m)
Other Capital Works (£1.240m) Estates Based Regeneration
(£0.311m) Sheltered Housing
(£1.551m)
Total (£19.349m)
Category Amount Project
Improvements £0.109m Kitchen Programme
£0.019m Other Minor Adjustments
£0.128m
Total £0.128m
Category Amount Comments
Capital Grants £8.208m Reduction aligned to projected expenditure
Borrowing £11.013m Reduction aligned to projected expenditure
Total £19.221m
177

Page 178

2.15  Projected Capital Expenditure to 31 March 2024 
The projections are summarised in the following table:   
2.16 A variance of (£0.686m) is projected within the HRA capital programme for 2023/24
arising from revisions to a number of projects, including: 
2.17 In addition to the adjustments noted above Appendix 2 highlights a number of
proposed virements which are required to transfers budgets between individual
projects and align the budgets with the projected expenditure. 
2.18 Further cost pressures resulting from inflationary and supply chain issues continue to
be monitored and a review of the potential impact on the Business Plan and Capital
Programme will be undertaken to address any identified issues. Further information
on the progress of all projects can be found in Appendix 2. 
Approved
Budget
2023/24
Carry
Forwards
and
Adjustments
Revised
Budget
2023/24
Projected
Expenditure /
Income to 31
March 2024
Projected
Variance
Over /
(Under)
Service £m £m £m £m £m
Expenditure
Housing Revenue Account 59.655 (19.221) 40.434 39.748 (0.686)
Total Expenditure 59.655 (19.221) 40.434 39.748 (0.686)
Income
CFCR (5.151) - (5.151) (5.151) -
Capital Grants (14.993) 8.208 (6.785) (6.785) -
Use of Reserves (4.065) - (4.065) (4.065) -
Affordable Housing Contribution (2.445) - (2.445) (2.445) -
Prudential Borrowing (33.001) 11.013 (21.988) (21.302) 0.686
Total Income (59.655) 19.221 (40.434) (39.748) 0.686
Project Variance Comments
EWI £0.260m Additional scope and increased costs
Brathwic Terrace £0.125m Previous underspend overstated
Springvale £0.106m Previous underspend overstated
Dalrymple Place £0.017m Previous underspend overstated
Heating (£0.552m) Scope of works reduced
Health & Safety (£0.207m) Budget no longer required
Wet Rooms & Bathrooms (£0.192m) Scope of works reduced
Friars Lawn (£0.114m) Project completed at reduced cost
St Michael's Wynd (£0.101m) Previous overspend overstated
Asbestos (£0.017m) Budget no longer required
Major Improvements (£0.006m) Budget no longer required
Newhouse Drive (£0.005m) Budget no longer required
Total (£0.686m)
178

Page 179

3. Proposals 
3.1 That Cabinet agrees to:
(a)  note the revisions to budgets outlined in the report; 
(b)  note (i) the General Services and HRA revised budgets at 31 August 2023; and
(ii) the forecast expenditure to 31 March 2024; and
(c) approve the virement proposals noted within the HRA programme detailed in
appendix 2. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Expenditure will continue to be
closely monitored to ensure early action is taken regarding any projected
underspends or overspends. 
Human Resources 
4.2 None.
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by focusing our
investment on priorities, managing risk and supporting delivery of key priorities. 
Community Wealth Building 
4.7 None. 
179

Page 180

5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Capital Programme and Treasury Management Performance to 30 June 2023 – Cabinet 29
August 2023 
180

Page 181

North Ayrshire Council Capital Statement 2023/24 Appendix 1
TOTAL PROJECT
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Brought / Carry
Forward to 2024/25
Total Revised
Budget 2023/24
Year to Date Budget
2023/24
Actual Expenditure to
31 August 2023
Year to date
Variance 2023/24
Projected Expenditure
to 31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend
£ £ £ £ £ £ £ £ £ £ £ £ £
EXPENDITURE
Communities
Nursery Education 16,368,237 15,968,424 16,349,968 (18,269) 568,862 0 568,862 0 169,049 169,049 550,593 (18,269) (18,269)
Primary Schools 45,885,492 13,477,475 45,885,492 0 15,512,296 (32,329) 15,479,967 0 5,309,823 5,309,823 15,479,967 0 0
Secondary Schools 83,010,742 4,308,147 83,010,742 0 5,072,285 0 5,072,285 0 391,471 391,471 5,072,285 0 0
Special Education 25,343,637 25,243,710 25,343,637 0 138,595 0 138,595 0 38,668 38,668 138,595 0 0
Schools Other 880,194 411,495 880,194 0 728,737 0 728,737 0 260,038 260,038 728,737 0 0
Information & Culture 113,479 18,755 113,479 0 106,916 0 106,916 0 12,192 12,192 106,916 0 0
Completed Projects 43,419,379 43,394,998 43,419,379 0 3,679 0 3,679 0 (20,702) (20,702) 3,679 0 0
SUB TOTAL 215,021,160 102,823,005 215,002,891 (18,269) 22,131,370 (32,329) 22,099,041 0 6,160,540 6,160,540 22,080,772 (18,269) (18,269)
Chief Executive
Council IT Strategy 8,797,380 2,681,176 8,797,380 0 891,645 (120,000) 771,645 0 197,441 197,441 771,645 0 0
SUB TOTAL 8,797,380 2,681,176 8,797,380 0 891,645 (120,000) 771,645 0 197,441 197,441 771,645 0 0
Health & Social Care
Management & Support 1,916,678 357,088 1,916,678 0 1,226,875 0 1,226,875 0 285 285 1,226,875 0 0
Housing Non HRA 656,571 232,745 656,571 0 656,571 0 656,571 0 232,745 232,745 656,571 0 0
Adults 4,608,078 4,590,097 4,608,078 0 18,047 0 18,047 0 66 66 18,047 0 0
Young People 5,579,718 5,224,534 5,579,718 0 363,177 0 363,177 0 7,993 7,993 363,177 0 0
SUB TOTAL 12,761,045 10,404,464 12,761,045 0 2,264,670 0 2,264,670 0 241,089 241,089 2,264,670 0 0
Place
Roads 107,944,875 32,733,269 107,944,875 0 40,891,992 0 40,891,992 0 8,246,574 8,246,574 40,891,992 0 0
Streetscene 7,891,828 4,673,086 7,891,828 0 1,959,749 0 1,959,749 0 992,946 992,946 1,959,749 0 0
Transport 4,757,454 2,623,659 4,757,454 0 4,494,466 0 4,494,466 0 2,360,670 2,360,670 4,494,466 0 0
Waste Services 13,321,491 13,272,542 13,321,491 0 48,949 0 48,949 0 0 0 48,949 0 0
Renewable Energy 15,307,181 2,481,758 15,307,181 0 7,727,424 0 7,727,424 0 613,149 613,149 7,727,424 0 0
Office Accommodation 2,045,389 658,306 2,045,389 0 1,532,606 (109,889) 1,422,717 0 658,306 658,306 1,422,717 0 0
Other Property 6,283,104 702,190 6,283,104 0 4,753,194 (741,000) 4,012,194 0 205,301 205,301 4,012,194 0 0
Other Housing 470,000 0 470,000 0 381,025 0 381,025 0 (88,975) (88,975) 381,025 0 0
Economic Development & Regeneration 168,063,781 28,086,208 168,063,781 0 46,721,024 (4,729,117) 41,991,907 0 2,318,112 2,318,112 41,991,907 0 0
Completed Projects 6,355,261 6,275,623 6,355,261 0 40,595 0 40,595 0 (36,958) (36,958) 40,595 0 0
SUB TOTAL 332,440,365 91,506,641 332,440,365 0 108,551,024 (5,580,006) 102,971,018 0 15,269,126 15,269,126 102,971,018 0 0
Other
Other 9,061,004 0 9,061,004 0 2,312,004 0 2,312,004 0 0 0 2,312,004 0 0
SUB TOTAL 9,061,004 0 9,061,004 0 2,312,004 0 2,312,004 0 0 0 2,312,004 0 0
Uncertainty / Sensitivity Adjustment* (24,585,906) (24,585,906) (24,585,906)
Total Project Expenditure 578,080,954 207,415,285 578,062,685 (18,269) 136,150,713 (30,318,241) 105,832,472 0 21,868,196 21,868,196 105,814,203 (18,269) (18,269)
Total Project Income (136,150,713) 30,318,241 (105,832,472) (24,908,564) (24,908,564) 0 (105,814,203) 18,269 18,269
Total Net Expenditure 0 0 0 (24,908,564) (3,040,368) 21,868,196 0 0 0
* Sensitivity adjustment of 10% or 25% based on source and reliability of expenditure projections
On Target (+0.5% of budget) On Target (up to  5% delay of original timescales)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less) Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less) Significantly off target (+10% or more of original timescales)
The following classifications have been used to highlight financial performance against
budget
CURRENT YEAR 2023/24
Year Ended 31st March 2024
Period 5
The following classifications have been used to highlight delivery performance
against original timescales set
181

Page 182

Revised Budget
23/24 Variance
£ £ £ £ £ £ £ £ £
CAPITAL BORROWING
Prudential Borrowing 68,291,931 5,814,577 2,683,086 76,789,594 3,846,846 80,636,440 78,199,245 (2,437,195)
SUB TOTAL 68,291,931 5,814,577 2,683,086 76,789,594 3,846,846 0 80,636,440 0 78,199,245 (2,437,195)
SCOTTISH GOVERNMENT FUNDING
Specific Capital Grants
Early Learning & Childcare 0 26,594 59,206 85,800 0 85,800 85,801 85,800 0
Cycling / Walking /Safer Streets 1,159,954 (117,150) 271,000 1,313,804 30,000 1,343,804 0 1,343,804 0
Vacant & Derelict Land Funding 3,857,216 403,874 198,048 4,459,138 0 4,459,138 2,953,137 3,312,120 (1,147,018)
UK Government Grant - AGD 3,653,000 (98,741) 3,554,259 (1,215,259) 2,339,000 65,327 949,157 (1,389,843)
Town Centre Regeneration 0 65,691 140,000 205,691 0 205,691 205,690 205,691 0
Annickbank - Vacant & Derelict Land Investment Programme 400,000 400,000 0 400,000 400,000 400,000 0
Millport Town Hall Regeneration 0 (31,995) 252,529 220,534 0 220,534 220,534 220,534 0
Millport Town Hall Phase 2 94,022 339,498 433,520 0 433,520 433,520 433,520 0
Garrison House Project 730,998 730,998 0 730,998 0
Ardrossan Promenade 788,000 788,000 0 788,000 763,000 788,000 0
Islands Pit Stops 20,000 520,000 540,000 0 540,000 540,000 40,000 (500,000)
Islands Cost Crisis Emergency Fund 17,000 17,000 0 17,000 17,000 17,000 0
Place Based Investment Programme 0 622,801 948,836 1,571,637 761,000 2,332,637 2,332,637 2,202,637 (130,000)
UK Shared Prosperity Fund 98,414 98,414 202,330 300,744 300,744 300,744 0
Island Infrastructure Fund 0 140,373 140,373 0 140,373 140,374 140,373 0
Dyemill Bike Park Project 220,625 220,625 0 220,625 0
B714 Improvements 500,000 322,741 822,741 428,054 1,250,795 1,250,795 1,250,795 0
Road Safety Improvement Fund 215,647 215,647 0 215,647 0
Renewal of Play Parks 231,000 231,000 (231,000) 0 0 0 0
2-4 Boyle Street Hostel 31,025 31,025 0 31,025 0 31,025 0
CO2 Monitors in Schools 0 0 76,651 76,651 76,651 76,651 0
Capital Grants
Flooding 20,525,000 20,525,000 0 20,525,000 0 20,525,000 0
General Capital Grant 15,179,000 15,179,000 (1,368,000) 13,811,000 14,513,750 13,811,000 0
SUB TOTAL 45,105,170 1,896,235 3,615,531 50,616,936 (148,954) 0 50,467,982 24,298,961 47,301,121 (3,166,861)
OTHER INCOME TO PROGRAMME
Use of Funds :-
Capital Fund 0 0 0 0 0 0 0 0 0 0
Change & Service Redesign Fund 0 0 0 0 0 0 0 0 0 0
CFCR 0 0 0 0 300,000 0 300,000 300,000 300,000 0
Grants & Contributions 2,068,411 632,323 301,603 3,002,337 1,246,534 0 4,248,871 277,737 4,102,323 (146,548)
Capital Receipts 465,555 0 0 465,555 31,865 0 497,420 31,865 497,420 0
SUB TOTAL 2,533,966 632,323 301,603 3,467,892 1,578,399 0 5,046,291 609,602 4,899,743 (146,548)
TOTAL CAPITAL PROGRAMME FUNDING 115,931,067 8,343,135 6,600,220 130,874,422 5,276,291 0 136,150,713 24,908,564 130,400,109 (5,750,604)
23/24 Budget at
Capital Refresh
Mar 2023
Capital Programme Funding 2023/24
Projected Income
to 31st March
2024
Approved budget
at Period 1 used
as revised starting
point 2023/24
Actual Income to 31
August 2023Funding Description
Carry Forward
from 2022/23
Changes after
Capital Refresh Mar
2023
Total Changes in
Year
Changes at Capital
Refresh Mar 2024
182

Page 183

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date Budget
2023/24
Actual Expenditure to
31 August 2023
Year to date Variance
2023/24
Projected
Expenditure to 31
March 2024
Actual Over/ (Under)
Spend for 2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £ £ £ £
Nursery Education
Early Years Programme
EARLY LEARNING & CHILDCARE FUTURE PROJECTS 4,307 4,073 4,307 0 234 0 0 0 234 0 0 Future Projects Future Projects Future Projects Complete Complete
ST BRIDGETS EARLY YEARS 787,477 787,477 787,477 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
KILMORY EARLY YEARS 55,978 59,932 55,978 0 27,791 0 31,745 31,745 27,791 0 0 30-Sep-23 30-Sep-23 Construction On Target On Target
ST PETERS EARLY YEARS 1,261,310 1,248,429 1,261,310 0 17,583 0 4,703 4,703 17,583 0 0 Complete Complete Complete Complete Complete
ST JOHN OGILVIE EARLY YEARS 177,415 177,415 177,415 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
MAYFIELD PS EARLY YEARS 215,710 215,710 215,710 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
BEITH PS EARLY YEARS 339,763 341,180 339,763 0 0 0 1,417 1,417 0 0 0 Complete Complete Complete Complete Complete
SKELMORLIE PS EARLY YEARS 358,835 358,835 358,835 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
WEST KILBRIDE EARLY EARLY YEARS 232,807 226,562 232,807 0 7,752 0 1,507 1,507 7,752 0 0 Complete Complete Complete Complete Complete
GATESIDE EARLY YEARS 407,764 407,764 407,764 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
GARNOCK CAMPUS EARLY YEARS 58,755 58,755 58,755 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
FAIRLIE EARLY YEARS 205,120 208,220 205,120 0 0 0 3,100 3,100 0 0 0 Complete Complete Complete Complete Complete
ELDERBANK EARLY YEARS 22,983 22,983 22,983 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
DREGHORN EARLY YEARS 82,940 82,940 82,940 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CUMBRAE EARLY YEARS 40,184 40,195 40,184 0 0 0 12 12 0 0 0 Complete Complete Complete Complete Complete
LARGS CAMPUS EARLY YEARS 45,836 45,836 45,836 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
MOORPARK EARLY YEARS 182 182 182 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PIRNMILL EARLY YEARS 80,000 71,911 80,000 0 8,154 0 65 65 8,154 0 0 30-Sep-23 30-Sep-23 Construction On Target On Target
SHISKINE EARLY YEARS 127,013 127,013 127,013 0 0 0 0 0 0 0 0 30-Sep-23 30-Sep-23 Construction On Target On Target
CORRIE EARLY YEARS 38,605 28,442 38,605 0 10,163 0 0 0 10,163 0 0 Complete Complete Complete Complete Complete
LAMLASH EARLY YEARS 15,000 1,387 15,000 0 14,123 0 510 510 14,123 0 0 30-Sep-23 30-Sep-23 Construction On Target On Target
BRODICK EARLY YEARS 354,659 354,659 354,659 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
MARRESS HOUSE 4,010,310 3,673,508 4,010,310 0 450,000 0 113,198 113,198 450,000 0 0 22-Jul-22 01-Mar-24 Construction On Target Significantly off target Contractor delays
Completed Nursery Education
GLENCAIRN / LOUDON MONTGOMERY EARLY YEARS 170,429 170,429 170,429 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ARDEER EARLY YEARS 216,819 216,819 216,819 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ST JOHNS EARLY YEARS 283,930 283,930 283,930 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
STANLEY EARLY YEARS 27,514 27,514 27,514 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
KILWINNING (PENNYBURN SCHOOL) EARLY YEARS 648,135 648,135 648,135 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
DALRY EARLY YEARS CENTRE 56,920 56,920 56,920 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
SPRINGVALE EARLY YEARS 104,557 104,557 104,557 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ABBEY / ST LUKES PRIMARY SCHOOL EARLY YEARS 64,615 64,615 64,615 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ST LUKES EARLY YEARS 1,966 1,966 1,966 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CASTLEPARK EARLY YEARS 219,376 219,376 219,376 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
LAWTHORN EARLY YEARS 201,037 201,037 201,037 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
HAYOCKS EARLY YEARS 246,765 246,765 246,765 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
WOODLANDS EARLY YEARS 181,546 181,546 181,546 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CORSEHILL EARLY YEARS 536,144 536,144 536,144 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CALEDONIA EARLY YEARS 255,432 255,432 255,432 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
BLACKLANDS EARLY YEARS 204,144 204,144 204,144 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
WINTON EARLY YEARS 5,290 5,290 5,290 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
SPRINGSIDE EARLY YEARS 566,752 566,752 566,752 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ST MARKS EARLY YEARS 350,497 350,497 350,497 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
Other Nursery Education
ANNICK PRIMARY EXT - EARLY YRS PROVISION 3,103,416 3,083,147 3,085,147 (18,269) 33,062 0 12,793 12,793 14,793 (18,269) (18,269) 0 Complete Complete Complete Complete Holding Code
Total Nursery Education 16,368,237 15,968,424 16,349,968 (18,269) 568,862 0 169,049 169,049 550,593 (18,269) (18,269) 0
CAPITAL MONITORING 2023/24
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2023/24 BUDGETS
183

Page 184

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date Budget
2023/24
Actual Expenditure to
31 August 2023
Year to date Variance
2023/24
Projected
Expenditure to 31
March 2024
Actual Over/ (Under)
Spend for 2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
CAPITAL MONITORING 2023/24
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2023/24 BUDGETS
Primary Schools
MOORPARK PRIMARY 12,079,491 8,643,828 12,079,491 0 5,542,942 0 2,107,279 2,107,279 5,542,942 0 0 31-Jan-24 31-Jan-24 Construction On Target On Target
MONTGOMERIE PARK SCHOOL 23,448,999 4,262,189 23,448,999 0 9,243,600 0 3,166,190 3,166,190 9,243,600 0 0 01-Aug-25 01-Aug-25 Tender On Target On Target
UNIVERSAL FREE SCHOOL MEALS EXPANSION 3,211,546 0 3,211,546 0 252,174 0 0 0 252,174 0 0 31-Mar-24 31-Mar-24 Tender On Target On Target
UFSM ARDEER PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM BEITH PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM BRODICK PRIMARY SCHOOL 144,178 121,450 144,178 0 22,844 0 117 117 22,844 0 0 Complete Complete Complete Complete Complete
UFSM CORRIE PRIMARY SCHOOL 52,795 52,795 52,795 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
UFSM CORSEHILL PRIMARY SCHOOL 60,000 0 60,000 0 60,000 0 0 0 60,000 0 0 31-Aug-25 31-Aug-25 Tender On Target On Target
UFSM GARNOCK COMMUNITY CAMPUS 90,000 0 90,000 0 90,000 0 0 0 90,000 0 0 31-Aug-25 31-Aug-25 Tender On Target On Target
UFSM GLEBE PRIMARY SCHOOL 2,043,869 81 2,043,869 0 0 0 81 81 0 0 0 31-Aug-29 31-Aug-29 Tender On Target On Target
UFSM GLENCAIRN PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM HAYOCKS PRIMARY SCHOOL 82,500 0 82,500 0 82,500 0 0 0 82,500 0 0 31-Aug-25 31-Aug-25 Development On Target On Target
UFSM KILMORY PRIMARY SCHOOL 60,000 32,057 60,000 0 60,000 0 32,057 32,057 60,000 0 0 31-Aug-24 31-Aug-24 Tender On Target On Target
UFSM LARGS PRIMARY SCHOOL 148,533 148,533 148,533 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
UFSM LOUDOUN-MONTGOMERY PRIMARY SCHOOL 2,081,077 0 2,081,077 0 0 0 0 0 0 0 0 31-Aug-28 31-Aug-28 Tender On Target On Target
UFSM PENNYBURN PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM SHISKINE PRIMARY SCHOOL 15,000 6,072 15,000 0 8,928 0 0 0 8,928 0 0 31-Aug-23 30-Sep-23 Construction On Target On Target
UFSM WEST KILBRIDE PRIMARY SCHOOL 2,252,504 201,931 2,252,504 0 34,308 0 (4,441) (4,441) 1,979 (32,329) (32,329) 31-Aug-27 31-Aug-27 On Site On Target On Target
UFSM WHITING BAY PRIMARY SCHOOL 25,000 8,540 25,000 0 25,000 0 8,540 8,540 25,000 0 0 30-Sep-23 30-Sep-23 Construction On Target On Target
Total Primary Education 45,885,492 13,477,475 45,885,492 0 15,512,296 0 5,309,823 5,309,823 15,479,967 (32,329) 0 (32,329) 
Secondary Schools
KILWINNING LEARNING ENVIRONMENT 2,805,435 2,428,845 2,805,435 0 378,401 0 1,811 1,811 378,401 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
ARDROSSAN NEW BUILD 80,205,307 1,879,302 80,205,307 0 4,693,884 0 389,660 389,660 4,693,884 0 0 31-Aug-26 31-Aug-26 In Development On Target On Target
Total Secondary Education 83,010,742 4,308,147 83,010,742 0 5,072,285 0 391,471 391,471 5,072,285 0 0 0
Special Education
LOCKHART CAMPUS 25,343,637 25,243,710 25,343,637 0 138,595 0 38,668 38,668 138,595 0 0 Complete Complete Snagging Complete Complete
Total Special Education 25,343,637 25,243,710 25,343,637 0 138,595 0 38,668 38,668 138,595 0 0 0
Schools Other
CO2 MONITORS IN SCHOOLS 298,000 156,628 298,000 0 146,543 0 5,171 5,171 146,543 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SCHOOLS ICT INVESTMENT * 582,194 254,867 582,194 0 582,194 0 254,867 254,867 582,194 0 0 31-Mar-24 31-Mar-24 On-going On Target On Target
Total Schools Other 880,194 411,495 880,194 0 728,737 0 260,038 260,038 728,737 0 0 0
Information & Culture
CASTLES & HISTORIC MONUMENTS 38,303 12,192 38,303 0 38,303 0 12,192 12,192 38,303 0 0 Holding Code Holding Code Holding Code Holding Code Holding Code
ABBEY TOWER 75,176 6,563 75,176 0 68,613 0 0 0 68,613 0 0 31-Mar-25 31-Mar-25 Planning On Hold On Hold
Total Information & Cultural 113,479 18,755 113,479 0 106,916 0 12,192 12,192 106,916 0 0 0
Completed Projects
GARNOCK CAMPUS 40,307,259 40,283,664 40,307,259 0 2,893 0 (20,702) (20,702) 2,893 0 0 Complete Complete Complete Complete Complete
AUCHENHARVIE SECONDARY ESTATE LEARNING ENVT 3,112,120 3,111,334 3,112,120 0 786 0 0 0 786 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 43,419,379 43,394,998 43,419,379 0 3,679 0 (20,702) (20,702) 3,679 0 0 0
Total Communities 215,021,160 102,823,005 215,002,891 (18,269) 22,131,370 0 6,160,540 6,160,540 22,080,772 (50,598) (18,269) (32,329)
184

Page 185

CHIEF EXECUTIVE
MILESTONE
Total Project Budget                   
Cumulative
Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 31
August 2023
Year to date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project
Stage
Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £ £ £ £
Council IT Strategy
ICT INVESTMENT FUND 4,075,490 957,838 4,075,490 0 543,757 0 48,105 48,105 473,757 (70,000) (70,000) 31-Mar-26 31-Mar-26 On-going On Target On Target
WAN 902,197 402,197 902,197 0 0 0 0 0 0 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
LAN/WiFi 2,673,000 1,073,483 2,673,000 0 228,838 0 129,322 129,322 228,838 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
TELEPHONY 1,146,693 247,657 1,146,693 0 119,050 0 20,014 20,014 69,050 (50,000) (50,000) 31-Mar-28 31-Mar-28 Implementation On Target On Target
Total IT Strategy 8,797,380 2,681,176 8,797,380 0 891,645 0 197,441 197,441 771,645 (120,000) 0 (120,000)
Total Chief Executive 8,797,380 2,681,176 8,797,380 0 891,645 0 197,441 197,441 771,645 (120,000) 0 (120,000)   
CAPITAL MONITORING 2023/24
CommentsProject Description
COMPLETION DATESTOTAL PROJECT DELIVERY STATUS2023/24 BUDGETS
185

Page 186

HEALTH & SOCIAL CARE
MILESTONE
Total Project
Budget                   
Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date Budget
2023/24
Actual Expenditure to
31 August 2023
Year to date Variance
2023/24
Projected Expenditure
to 31 March 2024
Actual Over/
(Under) Spend for
2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £ £ £ £
Management & Support
COMMUNITY ALARMS - ANALOGUE TO DIGITAL 996,000 4,190 996,000 0 658,810 0 0 0 658,810 0 0 29-Feb-24 29-Feb-24 Future Years On Target On Target
CAREFIRST IT SYSTEM 84,620 84,620 84,620 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CAREFIRST REPLACEMENT 536,058 267,993 536,058 0 268,065 0 0 0 268,065 0 0 31-Aug-24 31-Aug-24 In development On Target On Target
47 WEST ROAD 300,000 285 300,000 0 300,000 0 285 285 300,000 0 0 21-Jun-24 21-Jun-24 Refurbishment On Target On Target
Total Management & Support 1,916,678 357,088 1,916,678 0 1,226,875 0 285 285 1,226,875 0 0 0
Housing Non HRA
IMPROVEMENT GRANTS * 656,571 232,745 656,571 0 656,571 0 232,745 232,745 656,571 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target 
Total Housing Non HRA 656,571 232,745 656,571 0 656,571 0 232,745 232,745 656,571 0 0 0
Adults
TRINDLEMOSS 4,608,078 4,590,097 4,608,078 0 18,047 0 66 66 18,047 0 0 Complete Complete Complete Complete Complete
Total Older People 4,608,078 4,590,097 4,608,078 0 18,047 0 66 66 18,047 0 0 0
Young People
RESIDENTIAL & RESPITE UNIT 5,579,718 5,224,534 5,579,718 0 363,177 0 7,993 7,993 363,177 0 0 Complete Complete Snagging Complete Complete
Total Young People 5,579,718 5,224,534 5,579,718 0 363,177 0 7,993 7,993 363,177 0 0 0
Total Health & Social Care 12,761,045 10,404,464 12,761,045 0 2,264,670 0 241,089 241,089 2,264,670 0 0 0
CAPITAL MONITORING 2023/24
2023/24 BUDGETSTOTAL PROJECT COMPLETION DATES
CommentsProject Description
DELIVERY STATUS
186

Page 187

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 31
August 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £ £ £ £
Roads
ROADS IMPROVE/RECONSTRUCTION * 4,447,261 4,447,261 4,447,261 0 4,447,261 0 1,474,273 1,474,273 4,447,261 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
ROAD SAFETY IMPROVEMENT FUND 215,647 215,647 215,647 0 215,647 0 0 0 215,647 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
A737 DALRY BYPASS 375,735 375,735 375,735 0 375,735 0 207,363 207,363 375,735 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
TRAFFIC CALMING 175,000 92,047 175,000 0 82,953 0 0 0 82,953 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
LIGHTING * 1,417,342 173,530 1,417,342 0 1,417,342 0 173,530 173,530 1,417,342 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
LED LIGHTING REPLACEMENT 694,999 79,132 694,999 0 154,169 0 79,132 79,132 154,169 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
A737 DALRY BYPASS LIGHTING 20,685 0 20,685 0 16,611 0 0 0 16,611 0 0 31-Mar-24 31-Mar-24 Preparing Works PackagesOn Target On Target
UPPER GARNOCK FPS 18,503,800 17,778,338 18,503,800 0 1,067,828 0 342,366 342,366 1,067,828 0 0 Complete Complete Complete Complete Complete
MILLPORT COASTAL FPS 48,599,797 6,764,940 48,599,797 0 26,724,382 0 4,924,526 4,924,526 26,724,382 0 0 31-Aug-24 31-Aug-24 Construction On Target On Target
MILLBURN FPS 1,757,000 253,471 1,757,000 0 393,547 0 0 0 393,547 0 0 31-Jul-24 31-Jul-24 Design On Target On Target
MILLPORT PIER 500,000 150,080 500,000 0 40,000 0 0 0 40,000 0 0 31-Mar-25 31-Mar-25 In Development On Target On Target
BRIDGES INFRASTRUCTURE PROG * 899,430 390,224 899,430 0 899,430 0 390,224 390,224 899,430 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
LARGS PROMENADE SEAWALL 3,969,000 461,670 3,969,000 0 3,635,046 0 127,715 127,715 3,635,046 0 0 30-Apr-24 30-Apr-24 Construction On Target On Target
B714 UPGRADE 26,063,443 1,401,905 26,063,443 0 1,250,795 0 512,647 512,647 1,250,795 0 0 28-Feb-26 28-Feb-26 Final Design On Target On Target
LARGS CAR PARK INFRASTRUCTURE 55,128 55,128 55,128 0 661 0 661 661 661 0 0 Complete Complete Complete Complete Complete
PARKING CHARGES & DPE 250,610 94,162 250,610 0 170,585 0 14,137 14,137 170,585 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
Total Roads 107,944,875 32,733,269 107,944,875 0 40,891,992 0 8,246,574 8,246,574 40,891,992 0 0 0
Streetscene
CEMETERY EXTNS, WALLS & INFRA * 526,939 0 526,939 0 0 0 0 0 0 0 0 Holding Code Holding Code Holding Code Holding Code Holding Code
CMTY, LAMLASH - EXTENSION 715,065 715,065 715,065 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CMTY, ARDROSSAN - PLOTS/WALLS 217,922 160,418 217,922 0 61,864 0 4,361 4,361 61,864 0 0 Complete Complete Complete Complete Complete
CMTY, KILBIRNIE - WORKS 25,383 25,383 25,383 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CMTY, KILWINNING - NEW 1,402,589 1,365,070 1,402,589 0 138,061 0 100,542 100,542 138,061 0 0 Complete Complete Complete Complete Complete
CMTY, KNADGERHILL - EXTENSION 416,471 414,810 416,471 0 1,661 0 0 0 1,661 0 0 Complete Complete Complete Complete Complete
CMTY, WEST KILBRIDE - WORKS 398,033 370,915 398,033 0 36,892 0 9,774 9,774 36,892 0 0 Complete Complete Complete Complete Complete
CMTY, STEV HIGH ROAD - WORKS 506,878 494,031 506,878 0 137,408 0 124,560 124,560 137,408 0 0 Complete Complete Complete Complete Complete
ARDROSSAN CEMETERY NEW 603 603 603 0 0 0 0 0 0 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, BRODICK - NEW 12,000 8,317 12,000 0 4,979 0 1,296 1,296 4,979 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, KILBIRNIE - WALLS 188,370 16,106 188,370 0 172,744 0 480 480 172,744 0 0 31-Mar-25 31-Mar-25 Feasibility Works On Target On Target
CMTY, BEITH - WALLS 87,542 15,135 87,542 0 72,907 0 500 500 72,907 0 0 31-Mar-25 31-Mar-25 Feasibility Works On Target On Target
CMTY, ABBEY TOWER - WALLS 95,550 6,052 95,550 0 89,498 0 0 0 89,498 0 0 31-Aug-25 31-Aug-25 Feasibility Works On Target On Target
CMTY, STEV HAWKHILL - WALLS 108,732 5,860 108,732 0 102,872 0 0 0 102,872 0 0 31-Aug-25 31-Aug-25 Feasibility Works On Target On Target
CMTY, WEST KILBRIDE - WALLS 99,528 4,604 99,528 0 94,924 0 0 0 94,924 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, MILLPORT - WALLS 2,846 2,846 2,846 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, ARDROSSAN - WALLS 4,338 4,338 4,338 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, IRVINE OP CHURCH - WALLS 2,775 2,775 2,775 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, DREGHORN - WALLS 3,260 3,260 3,260 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, KILBIRNIE BARONY - WALLS 1,828 1,828 1,828 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, LAMLASH - WALLS 3,627 3,627 3,627 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, STEV HIGH KIRK - WORKS 22,754 22,754 22,754 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, KILBIRNIE - NEW 600,514 13,299 600,514 0 389,227 0 2,013 2,013 389,227 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, DALRY - WALLS 2,450 2,450 2,450 0 0 0 0 0 0 0 0 On Target On Target
CMTY, ARDROSSAN - EXTENSION 900,000 0 900,000 0 300,000 0 0 0 300,000 0 0 31-Mar-25 31-Mar-25 Planning On Target On Target
COASTAL PLAY PARKS 0 409,925 0 0 0 0 409,925 409,925 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
STREET FURNITURE IMPROVEMENT 69,469 87,569 69,469 0 0 0 18,099 18,099 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PARK ENABLING WORKS 85,363 138,005 85,363 0 0 0 52,642 52,642 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
RENEWAL OF PLAY PARKS 1,391,000 378,041 1,391,000 0 356,712 0 268,753 268,753 356,712 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
Total Streetscene 7,891,828 4,673,086 7,891,828 0 1,959,749 0 992,946 992,946 1,959,749 0 0 0
Transport
VEHICLES * 2,539,373 2,287,130 2,539,373 0 2,539,373 0 2,287,130 2,287,130 2,539,373 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target
WORKPLACE CHARGERS 318,261 291,515 318,261 0 92,858 0 66,112 66,112 92,858 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target
FLEET DECARBONISATION 1,899,820 45,014 1,899,820 0 1,862,235 0 7,429 7,429 1,862,235 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target
Total Transport 4,757,454 2,623,659 4,757,454 0 4,494,466 0 2,360,670 2,360,670 4,494,466 0 0 0
Waste Services
SHEWALTON LANDFILL 13,321,491 13,272,542 13,321,491 0 48,949 0 0 0 48,949 0 0 Complete Complete Complete Complete Complete
Total Waste Services 13,321,491 13,272,542 13,321,491 0 48,949 0 0 0 48,949 0 0 0
CAPITAL MONITORING 2023/24
Project Description
TOTAL PROJECT 2023/24 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
187

Page 188

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 31
August 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
CAPITAL MONITORING 2023/24
Project Description
TOTAL PROJECT 2023/24 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Renewable Energy
SOLAR PV RETROFIT EXTENSION 120,000 42,014 120,000 0 77,986 0 0 0 77,986 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SOLAR PV INVESTMENT - NETHERMAINS 7,289,441 557,642 7,289,441 0 6,622,319 0 411,961 411,961 6,622,319 0 0 30-Apr-24 30-Apr-24 Work Ongoing On Target On Target
SOLAR PV INVESTMENT - SHEWALTON 5,540,347 336,125 5,540,347 0 252,530 0 238,014 238,014 252,530 0 0 30-Oct-24 30-Oct-24 Work Ongoing On Target On Target
NON DOMESTIC ENERGY EFFICIENCY PROGRAMME 1,000,000 899,585 1,000,000 0 63,589 0 (36,827) (36,827) 63,589 0 0 31-Mar-24 31-Mar-24 Work Ongoing On Target On Target
NATURE RESTORATION FUND 711,000 0 711,000 0 711,000 0 0 0 711,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
ELECTRIC VEHICLES INFRASTRUCTURE 646,392 646,392 646,392 0 0 0 0 0 0 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
Total Renewable Energy 15,307,181 2,481,758 15,307,181 0 7,727,424 0 613,149 613,149 7,727,424 0 0 0
Office Accommodation
PROPERTY LIFECYCLE INVESTMENT * 459 0 459 0 459 0 0 0 459 0 0 31-Mar-24 31-Mar-24 Mulitple projects On Target On Target
PLI CALEY COURT RESOURCE CTR 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI CASTLEVIEW DAY SERVICES 15,240 0 15,240 0 15,240 0 0 0 15,240 0 0 30-Sep-23 30-Sep-23 Planning On Target On Target
PLI CENTRAL AVE STREETSCENE DEPOT* 2,080 1,820 2,080 0 2,080 0 1,820 1,820 2,080 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE CEMETERY 30,000 0 30,000 0 30,000 0 0 0 30,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI BEITH CEMETERY 69 69 69 0 69 0 69 69 69 0 0 Complete Complete Complete Complete Complete
PLI TOWNEND CC 7,949 7,949 7,949 0 7,949 0 7,949 7,949 7,949 0 0 Complete Complete Complete Complete Complete
PLI WHITLEES COMMUNITY CTR 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE COMMUNITY CENTRE 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI WOODWYND HALL 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI PORTLAND PLACE 17,267 17,267 17,267 0 17,267 0 17,267 17,267 17,267 0 0 Complete Complete Complete Complete Complete
PLI PADDOCKHOLM DEPOT 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI WEST BYREHILL DEPOT 107,524 107,524 107,524 0 107,524 0 107,524 107,524 107,524 0 0 Complete Complete Complete Complete Complete
PLI GOLDCRAIGS DEPOT 114,767 4,878 114,767 0 114,767 0 4,878 4,878 4,878 (109,889) (109,889) 31-Mar-25 31-Mar-25 Planning On Target On Target
PLI ANNICK PRIMARY SCHOOL 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI ARDEER PRIMARY SCHOOL 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI BEITH PRIMARY SCHOOL 1,957 1,957 1,957 0 1,957 0 1,957 1,957 1,957 0 0 Complete Complete Complete Complete Complete
PLI BLACKLANDS PRIMARY SCHOOL 0 (4,080) 0 0 0 0 (4,080) (4,080) 0 0 0 Complete Complete Complete Complete Complete
PLI CALEDONIA PRIMARY SCHOOL 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI CASTLEPARK PRIMARY SCHOOL 83,915 0 83,915 0 83,915 0 0 0 83,915 0 0 Complete Complete Complete Complete Complete
PLI CUMBRAE PRIMARY 3,867 3,867 3,867 0 3,867 0 3,867 3,867 3,867 0 0 Complete Complete Complete Complete Complete
PLI DALRY PRIMARY SCHOOL 68,314 0 68,314 0 0 0 0 0 0 0 0 18-Aug-24 18-Aug-24 Planning On Target On Target
PLI DREGHORN PRIMARY SCHOOL 71,453 57,780 71,453 0 71,453 0 57,780 57,780 71,453 0 0 Complete Complete Complete Complete Complete
PLI FAIRLIE PRIMARY SCHOOL 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI GLENCAIRN PRIMARY SCHOOL 573 573 573 0 573 0 573 573 573 0 0 Complete Complete Complete Complete Complete
PLI PENNYBURN PRIMARY 178,419 39,922 178,419 0 178,419 0 39,922 39,922 178,419 0 0 31-Aug-23 30-Sep-23 Construction On Target Slightly off target  Slight delay on site leading to revised completion date.
PLI PIRNMILL PRIMARY 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI SHISKINE PRIMARY 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI SKELMORLIE PRIMARY SCHOOL 568,449 16,996 568,449 0 123,980 0 16,996 16,996 123,980 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI ST BRIDGETS PRIMARY 12,053 18,195 12,053 0 12,053 0 18,195 18,195 12,053 0 0 Complete Complete Complete Complete Complete
PLI ST JOHN OGILVIE PRIMARY SCHOOL 6,744 6,744 6,744 0 6,744 0 6,744 6,744 6,744 0 0 Complete Complete Complete Complete Complete
PLI ST PETER'S PRIMARY 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE PRIMARY* 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI WOODLANDS PRIMARY 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI AUCHENHARVIE ACADEMY* 374,081 272,662 374,081 0 374,081 0 272,662 272,662 374,081 0 0 31-Dec-23 31-Dec-23 Construction On Target On Target
PLI IRVINE ROYAL ACADEMY* 12,000 12,000 12,000 0 12,000 0 12,000 12,000 12,000 0 0 Complete Complete Complete Complete Complete
PLI KILWINNING ACADEMY 188,421 25,930 188,421 0 188,421 0 25,930 25,930 188,421 0 0 31-Oct-23 31-Dec-23 Construction On Target Slightly off target  Underlying structural issues identified during
constuction work which now requires remedial action.
Cost and completion dates still to be determined.
PLI 6A KILWINNING ROAD 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI KYLE ROAD UNIT 34 4,067 0 4,067 0 4,067 0 0 0 4,067 0 0 31-Aug-23 31-Aug-23 Construction On Target On Target
PLI IRVINE LIBRARY 5,977 0 5,977 0 5,977 0 0 0 5,977 0 0 30-Sep-23 30-Sep-23 Planning On Target On Target
PLI LARGS LIBRARY 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI STEVENSTON LIBRARY 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI CUNNINGHAME HOUSE 0 0 0 0 0 0 0 0 0 0 0 On Hold On Hold On Hold On Hold On Hold
PLI H&SCP 47 WEST ROAD 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI GALT HOUSE 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI ACHNAMARA CHILDREN'S UNIT 9,000 0 9,000 0 9,000 0 0 0 9,000 0 0 Complete Complete Complete Complete Complete
PLI THE MEADOWS 22,000 0 22,000 0 22,000 0 0 0 22,000 0 0 Complete Complete Complete Complete Complete
PLI ANAM CARA 28,333 20,409 28,333 0 28,333 0 20,409 20,409 28,333 0 0 31-Oct-23 31-Oct-23 Construction On Target On Target
PLI EGLINTON CASTLE 48,000 0 48,000 0 48,000 0 0 0 48,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI GARNOCK CAMPUS 5,800 0 5,800 0 5,800 0 0 0 5,800 0 0 30-Sep-23 30-Sep-23 Planning On Target On Target
PLI THE PORTAL 56,611 45,843 56,611 0 56,611 0 45,843 45,843 56,611 0 0 Complete Complete Complete Complete Complete
Total Office Accommodation 2,045,389 658,306 2,045,389 0 1,532,606 0 658,306 658,306 1,422,717 (109,889) 0 (109,889)
188

Page 189

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 31
August 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
CAPITAL MONITORING 2023/24
Project Description
TOTAL PROJECT 2023/24 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Other Property
INDUSTRIAL PORTFOLIO * 430,713 0 430,713 0 430,713 0 0 0 430,713 0 0 On Hold On Hold On Hold On Hold On Hold
HOME 4,470,198 289,898 4,470,198 0 3,148,529 0 1,250 1,250 3,148,529 0 0 On Hold On Hold On Hold On Hold On Hold
BUILD 47,749 47,749 47,749 0 1,500 0 1,500 1,500 1,500 0 0 0 On Hold On Hold On Hold On Hold On Hold
EMERGENCY CONTROL CTR 158,000 66,220 158,000 0 156,780 0 65,000 65,000 156,780 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
GOLDCRAIGS REFURBISHMENT 766,000 25,000 766,000 0 741,000 0 0 0 0 (741,000) (741,000) 31-Mar-26 31-Mar-26 In development On Target On Target
GALLOWGATE TOILETS 275,803 169,133 275,803 0 246,153 0 139,483 139,483 246,153 0 0 31-Aug-23 31-Oct-23 In development On Target Slightly off target  Contractor delays linked to materials delay and sub-
contractor availability
WOODLANDS PRIMARY PLAYINGFIELD DRAINAGE 134,641 104,190 134,641 0 28,519 0 (1,932) (1,932) 28,519 0 0 Complete Complete Complete Complete Complete
Total Property 6,283,104 702,190 6,283,104 0 4,753,194 0 205,301 205,301 4,012,194 (741,000) 0 (741,000)
Other Housing
CCTV REVIEW 350,000 0 350,000 0 350,000 0 0 0 350,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
2-4 BOYLE STREET HOSTEL 120,000 0 120,000 0 31,025 0 (88,975) (88,975) 31,025 0 0 12-May-23 12-May-23 Construction On Target On Target
Total Other Housing 470,000 0 470,000 0 381,025 0 (88,975) (88,975) 381,025 0 0 0
Regeneration
TOWN CENTRE REGENERATION 1,201,659 1,002,714 1,201,659 0 205,691 0 6,745 6,745 205,691 0 0 30-Sep-23 31-Mar-24 Construction On Target On Target
REPURPOSING PROPERTY GRANT FUND 348,665 49,406 348,665 0 347,985 0 48,726 48,726 97,985 (250,000) (250,000) 30-May-25 30-May-25 In development On Target On Target
MILLPORT TOWN HALL REGENERATION 754,026 754,026 754,026 0 220,534 0 220,534 220,534 220,534 0 0 31-May-23 31-Mar-24 Construction On Target Significantly off target
MILLPORT TOWN HALL PHASE 2 433,520 135,327 433,520 0 433,520 0 135,327 135,327 433,520 0 0 31-May-23 31-Mar-24 Construction On Target Significantly off target
GARRISON HOUSE PROJECT 730,998 0 730,998 0 730,998 0 0 0 730,998 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
ISLANDS PIT STOPS 540,000 0 540,000 0 540,000 0 0 0 40,000 (500,000) (500,000) 31-Jul-24 31-Jul-24 In development On Target On Target
ISLAND INFRASTRUCTURE FUND 259,000 148,590 259,000 0 140,374 0 29,964 29,964 140,374 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
DYEMILL BIKE PARK PROJECT 220,625 0 0 0 220,625 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
ISLANDS COST CRISIS FUND 17,000 0 17,000 0 17,000 0 0 0 17,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
PLACE BASED INVESTMENT PROGRAMME (PBIP) 1,041,035 373,748 1,041,035 0 1,010,258 0 342,971 342,971 1,010,258 0 0 31-Mar-26 31-Mar-26 In development On Target On Target
UK SHARED PROSPERITY FUND (SPF) 300,744 0 300,744 0 300,744 0 0 0 300,744 0 0 31-Mar-25 31-Mar-25 In development On Target On Target
PBIP 36 BANK STREET 169,999 94,728 169,999 0 86,827 0 11,556 11,556 36,827 (50,000) (50,000) 31-Dec-25 31-Dec-25 In development On Target On Target
PBIP GALT HOUSE 50,000 2,925 50,000 0 50,000 0 2,925 2,925 50,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
IRVINE HIGH STREET 2,837,316 2,720,001 2,837,316 0 115,961 0 (1,353) (1,353) 115,961 0 0 Complete Complete Complete Complete Complete
DOCKHEAD STREET SALTCOATS 100,000 0 100,000 0 100,000 0 0 0 100,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
MILLPORT CARS 11,943 0 11,943 0 11,943 0 0 0 11,943 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
MONTGOMERIE PARK MASTERPLAN 4,218,597 1,777,472 4,218,597 0 353,665 0 2,540 2,540 78,665 (275,000) (275,000) 31-Mar-30 31-Mar-30 In development On Target On Target
LOCHSHORE, KILBIRNIE 2,061,138 2,024,355 2,061,138 0 419,358 0 382,575 382,575 419,358 0 0 31-May-25 31-May-25 In development On Target On Target
LOCHSHORE GARNOCK HUB 4,195,999 4,023,247 4,195,999 0 112,229 0 (60,524) (60,524) 112,229 0 0 Complete Complete Complete Complete Complete
VDLF - KYLE ROAD PHASE 2 1,798,066 143,495 1,798,066 0 1,657,226 0 2,655 2,655 570,208 (1,087,018) (1,087,018) 31-Mar-24 31-Dec-26 In development On Target On Target
VDLF - ANNICKBANK PH 3* 1,986,000 608,651 1,986,000 0 1,909,739 0 532,390 532,390 1,909,739 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
VDLF - DEVELOPMENT WORK* 417,479 116,516 417,479 0 324,012 0 23,049 23,049 324,012 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
VDLF - STRATEGY 28,555 16,664 28,555 0 28,555 0 16,664 16,664 28,555 0 0 30-Sep-23 30-Sep-23 In development On Target On Target
VDLF - TREE PLANTING 50,000 2,400 50,000 0 47,600 0 0 0 47,600 0 0 31-Dec-23 31-Dec-23 In development On Target On Target
MONTGOMERIE PARK NEIGHBOURHOOD CTR 175,000 0 175,000 0 175,000 0 0 0 175,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
VDLF STALLED SPACES FUND 125,000 0 125,000 0 125,000 0 0 0 125,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
QUARRY ROAD PHASE 2 5,209,497 5,204,719 5,209,497 0 4,778 0 0 0 4,778 0 0 Complete Complete Complete Complete Complete
CYCLING/WALKING/SAFER STREETS * 1,311,610 819,545 1,311,610 0 1,311,610 0 26,449 26,449 1,311,610 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
ACCESS PATH NETWORK PROGRAMME * 669,667 224,667 669,667 0 669,667 0 163,419 163,419 224,667 (445,000) (445,000) 31-Mar-24 31-Mar-25 Various On Target On Target
FAIRLIE COASTAL PATH 500,000 500,000 500,000 0 500,000 0 0 0 500,000 0 0 31-Dec-23 31-Dec-23 In development On Target On Target
IRVINE CYCLE FRIENDLY TOWN 50,000 466,198 50,000 0 50,000 0 0 0 50,000 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
BRODICK TO CORRIE CYCLE PATH 80,000 60,199 80,000 0 80,000 0 0 0 80,000 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
ARDROSSAN PROMENADE 788,000 20,514 788,000 0 788,000 0 20,514 20,514 788,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
BUS CORRIDOR IMPROVEMENTS 289,041 189,514 289,041 0 100,000 0 472 472 100,000 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
CUMBRAE FERRY & BUS STOP 489,547 231,407 489,547 0 350,000 0 91,861 91,861 350,000 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
KILBIRNIE TO KILWINNING 20,000 0 20,000 0 20,000 0 0 0 20,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
B714 ACTIVE TRAVEL IMPROVEMENTS 500,000 100,000 500,000 0 400,000 0 0 0 400,000 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
B777 CORRIDOR IMPROVEMENTS 38,400 21,510 38,400 0 33,600 0 16,710 16,710 33,600 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
CYCLE SHELTER 11,409 0 11,409 0 11,409 0 0 0 11,409 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SALTCOATS OLD CAL RAILWAY PH1 170,075 55,075 170,075 0 115,000 0 0 0 115,000 0 0 26-Jun-23 26-Jun-23 Planning On Target On Target
SALTCOATS OLD CAL RAILWAY PH2 31,888 0 31,888 0 31,888 0 0 0 31,888 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
Total Regeneration 34,010,873 21,887,612 34,010,873 0 14,150,796 0 2,016,168 2,016,168 11,543,778 (2,607,018) 0 (2,607,018)
Community led regeneration project by Millport Town
Hall Charity. Project has been delayed due to challenges
with contractor and work needing redone as did not met
a satisfactory standard.  Regeneration team continues to
support MTHC in the delivery of the project.
189

Page 190

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 31
August 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
CAPITAL MONITORING 2023/24
Project Description
TOTAL PROJECT 2023/24 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Ayrshire Growth Deal
AYRSHIRE GROWTH DEAL 0 0 0 0 0 0 0 0 0 0 0 31-Mar-26 31-Mar-26 On Target On Target
AGD - I3 DPMC PHASE 1 1,000,000 5,449 1,000,000 0 400,000 0 0 0 295,000 (105,000) (105,000) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 DPMC PHASE 2 4,999,999 248,651 4,999,999 0 200,000 0 9,235 9,235 45,000 (155,000) (155,000) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 1 15,617,569 610,750 15,617,569 0 3,056,569 0 65,327 65,327 1,666,726 (1,389,843) (1,389,843) 31-Oct-24 31-Oct-24 Multiple Projects On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 2 100,000 0 100,000 0 100,000 0 0 0 100,000 0 0 31-Mar-28 31-Mar-28 Multiple Projects On Target On Target
AGD - HUNTERSTON - CENTRE OF LOW CARBON ENERGY & CIRCULAR
ECONOMY
18,040,001 234,562 18,040,001 0 200,000 0 2,335 2,335 200,000 0 0 31-Mar-30 31-Mar-30 Multiple Projects On Target On Target
AGD - GREAT HARBOUR 14,187,576 652,042 14,187,576 0 503,000 0 53,953 53,953 423,021 (79,979) (79,979) 31-Mar-28 31-Mar-28 Multiple Projects On Target On Target
AGD - IMSE 10,500,000 137,404 10,500,000 0 100,000 0 3,891 3,891 100,000 0 0 31-Mar-30 31-Mar-30 Design On Target On Target
AGD - MARINE TOURISM ARDROSSAN 7,500,000 335,474 7,500,000 0 450,000 0 778 778 18,000 (432,000) (432,000) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - MARINE TOURISM ARRAN 2,025,577 66,203 2,025,577 0 30,000 0 5,719 5,719 30,000 0 0 31-Mar-29 31-Mar-29 Design On Target On Target
AGD - MARINE TOURISM CUMBRAE 2,025,577 77,270 2,025,577 0 50,000 0 9,091 9,091 72,000 22,000 22,000 31-Mar-29 31-Mar-29 Design On Target On Target
Total Ayrshire Growth Deal 75,996,300 2,367,806 75,996,300 0 5,089,569 0 150,329 150,329 2,949,747 (2,139,822) 0 (2,139,822)
Growth & Investment
ARDROSSAN HARBOUR INTERCHANGE 4,127,112 483,952 4,127,112 0 128,000 0 28,501 28,501 145,723 17,723 17,723 1st Qtr 2026 1st Qtr 2026 Design On Target On Target
IRVINE ENTERPRISE AREA 10,746,072 0 10,746,072 0 0 0 0 0 0 0 0 Ongoing Ongoing Multiple Projects On Target On Target
LOW CARBON HUB 1,213,655 112,005 1,213,655 0 1,101,650 0 0 0 1,101,650 0 0 30-Sep-24 30-Sep-24 Multiple Projects On Target On Target
ARDROSSAN NORTH SHORE 41,532,859 2,940,615 41,532,859 0 26,092,051 0 106,849 106,849 26,092,051 0 0 27-May-24 27-May-24 Tender On Target On Target
VDLF - HARBOUR MASTERS OFFICE 157,500 37,198 157,500 0 136,567 0 16,265 16,265 136,567 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
VDLF - I3 IRVINE ENTERPRISE 279,411 257,020 279,411 0 22,391 0 0 0 22,391 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
Other Growth & Investment 58,056,609 3,830,791 58,056,609 0 27,480,659 0 151,615 151,615 27,498,382 17,723 0 17,723
Total Economic Development & Regeneration 168,063,781 28,086,208 168,063,781 0 46,721,024 0 2,318,112 2,318,112 41,991,907 (4,729,117) 0 (4,729,117)
Completed Projects
BIOMASS RETROFIT PROGRAMME 3,378,163 3,377,163 3,378,163 0 0 0 (1,000) (1,000) 0 0 0 Complete Complete Complete Complete Complete
QUARRY ROAD PHASE 1 2,977,098 2,898,460 2,977,098 0 40,595 0 (38,043) (38,043) 40,595 0 0 Complete Complete Defects Period Complete Complete
ARDROSSAN HOSTEL 0 0 2,086 2,086 0 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 6,355,261 6,275,623 6,355,261 0 40,595 0 (36,958) (36,958) 40,595 0 0 0
Total Place 332,440,365 91,506,641 332,440,365 0 108,551,024 0 15,269,126 15,269,126 102,971,018 (5,580,006) 0 (5,580,006)
190

Page 191

OTHER BUDGETS
AE
Total Project Budget                    Cumulative Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Year to Date Budget
2023/24
Actual Expenditure
to 31 August 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Over/ (Under)
Spend for 23/24
£ £ £ £ £ £ £ £ £ £
FLEXIBILITY / IMPROVEMENT FUND 9,061,004 0 9,061,004 0 1,961,004 0 0 0 1,961,004 0
CORE INFRASTRUCTURE INVESTMENT 351,000 0 351,000 0 351,000 0 0 0 351,000 0
Total Other Budgets 9,061,004 0 9,061,004 0 2,312,004 0 0 0 2,312,004 0
2023/24 BUDGETS
CommentsProject Description
TOTAL PROJECT
191

Page 192

HRA Capital Statement 2324 Appendix 2
TOTAL PROJECT CURRENT YEAR 2023/24 - Period 5
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Actual
Expenditure to
31 July 2023
Projected Expenditure to 31st
March 2024
Virement
Request
Carry /Brought
Forward to /From
2024/25
True Over/ (Under)
Spend
Delivery Status
Financial Delivery Status Physical Narrative
£ £ £ £
EXPENDITURE
Council House Building
Afton Court 1,335,654 1,214,308 1,335,654 0 681,987 560,641 681,987 On Target Complete Complete
Ayrshire Central Site 50,373,322 2,837,511 50,373,322 0 600,000 278,860 600,000 On Target Significantly off target Project due to commence on site February 2024. 
Bourtreehill Village 9,924,743 75,309 9,924,743 0 50,000 9,444 50,000 On Target Significantly off target Project due to commence on site October 2024.
Brathwic Terrace 6,674,074 6,522,518 6,674,074 0 26,403 (41,542) 151,556 125,153 On Target Complete Complete
Caley Court 3,131,066 2,812,234 3,131,066 0 322,630 3,799 322,630 On Target Complete Complete
Corsehillhead 2,027,810 212,599 2,027,810 0 350,000 0 350,000 On Target Significantly off target Project due to commence on site November 2023.
Dalrymple Place 5,838,627 5,821,473 5,838,627 0 1,473 985 18,139 16,666 On Target Complete Complete
Flatt Road 19,934,544 19,620,843 19,934,544 0 302,327 (11,374) 302,327 0 On Target Complete Complete
Friars Lawn 2,199,628 2,072,013 2,086,112 (113,516) 231,468 103,033 117,952 (113,516) On Target Complete Complete
Fullarton Street (High Flats) 14,481,290 28,435 14,481,290 0 100,000 2,500 50,000 (50,000) On Target Significantly off target Demolition project completion deferred to November 2023.  New build project due to
commence on site July 2024.
Garnock Academy Site 12,092,889 659,796 12,092,889 0 3,500,000 64,812 1,110,750 (2,389,250) On Target Significantly off target Tender return delayed by one month. Project due to commence on site November/
December 2023.
Garrier Court 2,335,551 2,348,027 2,348,027 12,476 0 0 0 On Target Complete Complete
Glebe Place 1,894,952 0 1,894,952 0 0 0 0 On Target On Target Project deferred to 2026/27 following refurbishment of the block for Ukrainian funded by
the Scottish Government.
Harbourside 14,622,742 14,075,209 14,622,742 0 939,356 306,970 939,356 On Target Complete Complete
James McFarlane Site 4,784,118 376,551 4,784,118 0 500,000 0 450,000 (50,000) On Target Significantly off target Project due to commence on site November 2023.
James Reid Site 11,896,026 862,603 11,896,026 0 2,000,000 0 1,200,000 (800,000) On Target Significantly off target Project due to commence on site November 2023.
Kings Arms (113-115 High Street) 2,169,980 307,869 2,169,980 0 932,000 995 482,000 (450,000) On Target Significantly off target Project due to commence on site September 2023.
Laburnum Ave/Newhouse Dr (Regen 1a&b) 3,274,506 95 3,274,506 0 400,000 0 250,000 (150,000) On Target Significantly off target Project due to commence on site January 2024.
Largs Police Station 2,769,301 2,502,508 2,769,301 0 1,038,673 771,882 1,038,673 On Target On Target Project on-site due to complete August 2023
Montgomerie Park (Both Phases) 46,166,866 4,705,195 46,166,866 0 1,500,000 26,053 780,000 (720,000) On Target Significantly off target Project due to commence on site February 2024. 
Regeneration Project 1d 9,965,851 2,750 9,965,851 0 0 0 0 On Target Significantly off target Pre Site
Regeneration Project 1e 1,658,083 0 1,658,083 0 0 0 0 On Target Significantly off target Project due to commence on site June 2024.
Springvale  2,852,016 2,743,995 2,852,016 0 (2,000) 106,021 106,021 On Target Complete Complete
Stanecastle Site 7,768,147 604,509 7,768,147 0 750,000 0 450,000 (300,000) On Target Significantly off target Project due to commence on site November 2023.
St Beya Gardens 3,691,052 3,689,346 3,691,052 0 1,706 0 1,706 On Target Complete Complete 
St Colm's Largs 4,907,987 4,808,504 4,886,565 (21,422) 12,685 (65,376) 12,685 On Target Complete Complete 
St Michael's Wynd 13,996,769 13,909,119 13,996,769 0 0 (188,682) (101,032) (101,032) On Target Complete Complete  - in year credit expected from Scottish Water.
Towerlands Primary School 8,579,943 8,461,992 8,579,943 0 9,279 (108,673) 9,279 On Target Complete Complete
Unallocated Regeneration Block 8,304,876 0 8,304,876 0 479,000 0 479,000 On Target On Target
Nelson Street Regeneration 622,116 0 622,116 0 50,000 0 50,000 On Target Significantly off target Pre Site
Acquisition Of Land & Buildin 0 (112) 0 0 (112) 0 On Target On Target
House Building - General 1,547,765 0 1,547,765 0 1,547,765 0 0 (1,547,765) On Target On Target
Acquisition Houses-Open Market 254,752 165,772 254,752 0 254,752 165,772 254,752 0 On Target On Target
Dickson Drive Phase 2 0 0 0 0 0 0 On Target On Target
Harbour Street 0 0 0 0 0 0 On Target On Target
Refurb - Connell Court 0 (30,395) 0 0 (30,395) 0 On Target On Target Complete
Kinnear Road 2,118 0 2,118 0 2,118 0 2,118 On Target Complete Complete
Contingency 11,000,624 0 11,000,624 0 11,000,624 0 0 (11,000,624) On Target On Target
Internal Management Charges 1,757,259 462,855 1,757,259 0 1,757,259 462,855 1,757,259 On Target On Target
SUB TOTAL 293,079,788 101,410,576 292,957,326 (122,461) 29,341,505 2,310,448 11,917,158 0 (17,457,639) 33,292
Period 5
DELIVERY STATUS
192

Page 193

TOTAL PROJECT CURRENT YEAR 2023/24 - Period 5
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Actual
Expenditure to
31 July 2023
Projected Expenditure to 31st
March 2024
Virement
Request
Carry /Brought
Forward to /From
2024/25
True Over/ (Under)
Spend
Delivery Status
Financial Delivery Status Physical Narrative
£ £ £ £
DELIVERY STATUS
Improvements to existing stock
Wet Room - Void 426,386 23,203 273,109 (153,277) 426,386 23,203 273,109 0 (153,277) On Target On Target Reduction in estimated number of completions based on jobs received to date
Bathrooms - Void 770,876 163,353 732,305 (38,571) 770,876 163,353 732,305 0 (38,571) On Target On Target Reduction in estimated number of completions based on jobs received to date
Wet Room - Planned 150,025 0 150,025 0 150,025 0 150,025 0 On Target On Target
Bathrooms - Planned 341,561 62,481 341,561 0 341,561 62,481 341,561 0 On Target On Target
Electrical Rewiring 585,710 96,480 585,710 0 741,075 96,480 585,710 (155,365) On Target On Target Anticipated slippage due to no access.  Tender for new contract due in September.
Heating 2,924,745 669,314 2,372,885 (551,860) 2,924,745 669,314 2,372,885 0 (551,860) On Target On Target Additional 32 units completed but scope of works reduced resulting in an anticipated
underspend.  Tender for new contract due in September.
Kitchens 1,581,530 242,824 1,581,530 0 1,581,530 242,824 1,581,530 0 On Target On Target
Kitchens - Void 1,313,771 293,106 1,313,771 0 1,204,754 293,106 1,313,771 109,017 On Target On Target
Roofing 1,105,661 103,730 1,105,661 0 1,105,661 103,730 1,105,661 On Target On Target
Wallfloor rendering 62,000 791,817 62,000 0 1,090,726 791,817 62,000 (1,028,726) On Target On Target
EWI 4,313,962 0 4,573,500 259,538 2,369,236 0 4,573,500 1,944,726 259,538 On Target On Target Increase in expenditure due to increase in no of jobs and an increase in anticipated unit rate
Window Replacement 541,903 174,434 541,903 0 541,903 174,434 356,160 (185,743) On Target On Target Work being undertaken in relation to access arrangements. Housing will be reviewing this in
order to improve access.
Saltcoats MSF Investment 1,300,529 448,707 1,300,529 0 1,281,214 448,707 1,300,529 19,315 On Target On Target Projected expenditure includes buy-back houses, budget virement requested.
Smoke Detector Programme 250,000 73,318 250,000 0 250,000 73,318 250,000 On Target On Target Carry forward of £821k to be reprofiled over future years. £397k of underspend vired to
meet in year pressures in other budget lines.
Energy Efficiency 122,610 0 122,610 0 1,552,610 0 122,610 (1,430,000) On Target On Target
Path Finder Project 250,000 0 250,000 0 250,000 250,000 On Target On Target
Solar Panels 5,050,000 372,716 5,050,000 0 5,050,000 372,716 5,050,000 On Target On Target
SUB TOTAL 21,091,269 3,515,484 20,607,099 (484,170) 21,382,302 3,515,484 20,421,356 (264,000) (212,776) (484,170)
Other Capital works
Estate Based Regeneration 2,093,064 40,582 2,093,064 0 2,093,064 40,582 853,395 (1,239,669) On Target On Target Underspend to be reprofiled over future years.
Lift Replacement 454,425 0 454,425 0 100,000 0 100,000 On Target On Target Slippage on programme . Works now expected to commence Dec/Jan
Sheltered Housing Units 12,965,531 1,074,584 12,965,531 0 4,146,664 1,074,584 4,100,000 264,000 (310,664) On Target On Target Virement fom Energy efficiency to fund sutainability elements of the project. Underspend to
be reprofiled over future years.
High Flats Demolition 2,368,970 809,495 2,368,970 0 2,368,970 809,495 2,368,970 0 On Target On Target Completion anticipated November 2023
Health and Safety Works 207,000 0 0 (207,000) 207,000 0 0 (207,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Parkhall & Kirkhall Asbestos 17,358 0 0 (17,358) 17,358 0 0 (17,358) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Major Improvements 6,000 0 0 (6,000) 6,000 0 0 (6,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Newhouse Drive (Regen 1b) 5,000 0 0 (5,000) 5,000 0 0 (5,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Maress House Refurb (12,540) 0 (12,540) 0 (12,540) 0 (12,540) On Target On Target
SUB TOTAL 18,104,808 1,924,661 17,869,450 (235,358) 8,931,516 1,924,661 7,409,825 264,000 (1,550,333) (235,358)
Total Expenditure 311,184,596 103,335,238 310,826,776 (357,819) 59,655,323 7,750,593 39,748,339 0 (19,220,748) (686,236)
Income
Affordable Housing Contributn (2,444,930) (2,444,930) 0
CFCR (5,151,045) (5,151,045) 0
Capital Grants (14,993,130) (90,678) (6,785,747) 8,207,383
Prudential Borrowing (33,001,551) (21,301,950) 11,013,365 686,236
Council HB fund contribution (4,064,667) (4,064,667) 0
0
0
SUB TOTAL (59,655,323) (90,678) (39,748,339) 0 19,220,748 686,236
Total Project Expenditure 311,184,596 103,335,238 310,826,776 (357,819) 59,655,323 7,750,593 39,748,339 0 (19,220,748) (686,236)
Total Project Income (59,655,323) (90,678) (39,748,339) 0 19,220,748 686,236
Total Net Expenditure 0 7,659,915 0 0 0 0
Check Total
On Target (+0.5% of budget)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less)
The following classifications have been used to highlight financial performance against
budget
193

Page 194

194

Page 195

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Revenue Budget 2023/24 : Financial Performance to 31
August 2023 
Purpose:  To advise Cabinet of the financial performance for the Council
at 31 August 2023. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; and 
(c)  approve the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2023/24 were approved by Council on 1
March 2023. The Housing Revenue Account (HRA) Revenue Budget for 2023/24 was
approved by Council on 15 February 2023. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the second report for 2023/24 and covers the period to the end of
August 2023 (Period 5). Projections have been made to the year-end. 
1.3   At Period 5 the General Fund is forecasting a net in-year overspend of £0.424m,
(0.1%), after transferring resources to/from earmarked reserves. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£5.414m),
(9.3%). 
1.5  At the end of July 2023, the Health and Social Care Partnership is projecting a year-
end overspend of £3.859m, (1.2%), for 2023/24, a reduction of (£0.717m) from the
previously reported position. The Council services element is reporting a projected
overspend of £3.507m, which is an improvement of (£0.330m) from the previously
reported underspend, and the Health services element is reporting a projected
overspend of £0.352m, which is an improvement of (£0.387m) over the same period.  
Agenda Item 10
195

Page 196

1.6 Significant risks to the reported position have been identified arising from ongoing
inflationary pressures across services, linked to the higher than anticipated Consumer
Price Index, and the potential impact of the ongoing 2023/24 non teacher pay
negotiations. However, it is anticipated that any additional costs arising from these
negotiations will be matched by additional Scottish Government grant funding. The
financial projections do not include any short term reductions resulting from the
industrial action taken by non-teaching staff on 26th, 27th and 28th September 2023.
The full impact of this will be quantified and incorporated into future reports. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2023/24. In addition to the budget approved
on 1 March 2023, earmarked funds of £26.697m were carried forward from 2022/23
for service expenditure in 2023/24 and are reflected in the figures within the 2023/24
financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year overspend of £0.424m, (0.1%),
net of transfers to/from reserves, is anticipated for the year to 31 March 2024. 
2.3 Details of the current financial projections are summarised in the following table: 
Appendix
No
Annual
Budget
Projection
to  31
March 2024
Projected
Variance
for year
(Fav)/Adv
Projected
Variance @
Period 3 
(Fav)/Adv Movement Note
Service Expenditure £000's £000's £000's £000's £000's
Chief Executives 1 19,931     19,663      (268)        (58)             (210)        (i)
Communities 2 183,813   184,203     390         -                390         (ii)
Place 3 55,308     56,316      1,008       1,691         (683)        (iii)
Other Corporate Services 4 20,717     20,011      (706)        (831)           125         (iv)
Sub Total 279,769   280,193     424         802            (378)       
Health and Social Care
Partnership 8 121,744   121,744     -              -                -              2.6
Balance for Services 401,513   401,937     424         802            (378)       
Financing Charges 5 11,408     11,408      -              -                -             
Contribution to Loans Fund
Reserve 5 6,132       6,132        -              -                -             
Total Planned Expenditure 419,053   419,477     424         802            (378)       
Planned Income
Aggregate External Finance 5 (347,490)  (347,490)    -              -                -             
Council Tax 5 (65,397)    (65,397)     -              -                -             
Use of Earmarked Funds 5 (6,166)      (6,166)       -              -                -             
Total Planned Income (419,053)  (419,053)    -              -                -             
Net Expenditure/ (Income) -              424           424         802            (378)       
196

Page 197

2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that included in the approved budget, as detailed in the
following table: 
2.5 Commentary on Significant Movements from the Approved Budget 
The Council's overall financial forecast against the revised budget is a net overspend 
position. This includes a number of movements at a service level. Detailed
explanations of the significant variances in service expenditure compared to the
approved budgets are provided in appendices 1 to 5 to this report. 
A brief explanation of the significant movements for each service since Period 3 is
outlined as follows: 
(i) Chief Executive’s – underspend of (£0.268m), an increase of (£0.210m) from
the previously reported underspend 
The movement since Period 3 is primarily related to lower than forecast contract
renewal costs within ICT. 
(ii) Communities – overspend of £0.390m, an increase from the previously
reported breakeven position 
The movement since Period 3 reflects updated cost pressures across services,
including: 
• Additional employee costs associated with maintaining teacher numbers in line
with Scottish Government policy and absence cover arrangements, £1.014m;
and
• Additional net costs in relation to the PPP contract due to NDR revaluations and
higher than anticipated contract inflation, £0.160m. 
These have been partly offset by: 
• Vacancy management across services, including Early Learning and Childcare
and non-teaching costs within schools combined with a targeted reduction in
overtime and casual staff costs, (£0.623m); and 
• Lower than anticipated demand for placements with ELC funded providers,
(£0.199m).
Non Domestic
Rates
Specific
Grants TOTAL AEF
Planned Income £000's £000's £000's
Revised Budget 30 June 2023 (281,872)       (40,982)         (19,930)         (342,784)      
Movements:
SNCT Pay 22-23 / 23-24 (4,110)           (4,110)          
Ukrainian Resettlement (70)               (70)              
Summer Activities (132)             (132)            
Employability Staffing (394)             (394)            
Revised Planned Income (286,578)       (40,982)         (19,930)         (347,490)      
General Revenue
Grant
£000's
197

Page 198

Significant cost pressures continue to be experienced in relation to : 
• Increased residential childcare placements, £0.905m; and
• Significant costs pressures arising from the demand for Classroom Assistants,
£0.874m. 
These are currently being offset on an interim basis through the utilisation of
earmarked reserves. However, it is recognised that this is not a sustainable
solution and will require to be addressed through ongoing discussions with the
Scottish Government, management action and as part of the 2024-25 budget
process. 
(iii) Place – overspend of £1.008m, a reduction of (£0.683m) from the previously
reported overspend 
The movement since Period 3 reflects updated income and cost forecasts across
services, including: 
• Additional income from kerbside recycling contracts, (£0.333m);
• Additional rent income linked to increased demand for Temporary Furnished
Accommodation, (£0.081m); and
• Reduced Property Management and Investment expenditure linked to a
forecast reduction in internal recharges, (£0.069m). 
Virements in relation to the recognition of additional income within Roads have
been included within Appendix 7. 
(iv) Other Corporate Items – underspend of (£0.706m), a reduction of £0.125m
from the previously reported underspend 
The movement since Period 3 is primarily related to additional drawdown from
centrally held inflationary cost provisions to support pressures within services,
£0.249m, partly offset by revised Housing Benefit Overpayment Recovery
projections, (£0.100m). 
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of July 2023 is
attached at Appendix 8. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised as: 
• The projected outturn is a year-end overspend of £3.859m for 2023/24, a
reduction of (£0.717m) from the previously period.
• The projected overspend on the Council Services element is £3.507m, a reduction
of (£0.330m), with a projected overspend on the Health Services element of
£0.352m, a reduction of (£0.387m); 
198

Page 199

• The most significant areas of overspend include residential placements for
children, supplementary staff in wards and complex residential care packages
within the lead partnership for mental health. Further detail is included in the
report at Appendix 8. 
The main areas of risk identified in the report include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers;
• High risk areas of low volume / high-cost services areas e.g. Children’s residential
placements, Learning Disability care packages and complex care packages; 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this;
• Ongoing implementation costs of the Scottish Government policy directives;
• Lead / hosted service arrangements, including managing pressures and reporting
this across the 3 IJBs;
• The impact on Lead Partnership and acute services from decisions taken by other
Ayrshire areas;
• The Covid recovery process including the ability to change and improve services
following learning from the Covid response;
• Continuing risks associated with provider sustainability;
• The Local Government pay award is not settled for 2023-24 and negotiations are
ongoing, any increase above the budgeted 3% will impact on the financial position
unless additional funding is forthcoming. 
These risks will be monitored during 2023-24 and any impact reported through the
financial monitoring report 
Risks 
2.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to essential commodities, including food, and contractor costs. In
June 2023, Cabinet agreed to earmark £0.870m from the 2022/23 underspend to
address unbudgeted inflationary pressures arising from the ongoing cost of living
crisis. Any further increases beyond current budget provision may impact on future
service provision. 
Negotiations in relation to the 2023/24 pay settlement for non-teaching staff are
currently ongoing. It is anticipated that any additional costs arising from these
negotiations will be matched by additional Scottish Government grant funding,
however, the final impact of any award in excess of available funding may require the
utilisation of Council reserves, with a knock-on effect on future budget gaps. These
pressures are likely to be offset in the short term by reductions resulting from the
industrial action taken by non-teaching staff on 26th, 27th and 28th September 2023.
However, the full impact cannot be quantified at this time. The net risks arising from
any settlement will continue to be monitored and reported to Cabinet as appropriate. 
199

Page 200

Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2023/24 and an
in-year underspend of (£5.414m), (9.3%), is currently anticipated for the year to 31
March 2024. The projected position is summarised in the following table with further
details provided in Appendix 6. 
2.9 Commentary on Significant Movements from the Approved Budget 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Employee Costs – underspend of (£0.295m), a reduction from the previously
reported breakeven position 
The movement is primarily related to vacancy management across the service. 
(ii) Property Costs – overspend of £1.038m, an increase from the previously
reported breakeven position 
The movement is primarily related to a projected overspend on Void repairs,
£1.007m, resulting from an increase in the volume and scope of works. 
(iii) Capital Financing Costs – underspend of (£7.127m), an increase of
(£0.764m) from the previously reported underspend 
The movement is primarily related to reduced loan charges, reflecting the
utilisation on internal funds rather than borrowing, and further rephasing within the
HRA capital programme. 
(v) Income – underrecovery of £0.970m, an increase from the previously
reported breakeven position
The movement is primarily related to a projected underrecovery of rental income,
£0.958m, resulting from long term voids. 
Annual
Budget
Projection to 
31 March
2024
Projected
Variance for
year
(Fav)/Adv
Previous
Variance @
Period 3       
(Fav)/Adv Movement Note
£000's £000's £000's £000's £000's
Employee Costs 5,504        5,209          (295)             -                 (295)          (i)
Property Costs 22,717      23,755        1,038           -                 1,038        (ii)
Supplies and Services 672          656             (16)              -                 (16)           
Transport and Plant Costs 28            28              -                  -                 -              
Administration Costs 1,892        1,908          16               -                 16            
Third Party Payments 3,519        3,519          -                  -                 -              
Transfer Payments 172          172             -                  -                 -              
Other Expenditure 380          380             -                  -                 -              
Capital Financing 23,309      16,182        (7,127)          (6,363)         (764)          (iii)
Gross Expenditure 58,193      51,809        (6,384)          (6,363)         (21)           
Income (58,193)     (57,223)       970              -                 970           (iv)
Net Expenditure -               (5,414)         (5,414)          (6,363)         949          
200

Page 201

3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a)  note the information and financial projections outlined in the report; 
(b)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; and
(d)  approve the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 31 August 2023 is a net overspend of £0.424m. 
Housing Revenue Account
The net projection for the year as at 31 August 2023 is a net underspend of
(£5.414m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
201

Page 202

5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2023/24 : Financial Performance to 30 June 2023 – Cabinet 29 August
2023
202

Page 203

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 144              149              5                     3%
Total for Chief Executive 144              149              5                     3%
Financial Services
Change Programme 81                81                -                      0%
Audit, Fraud, Safety & Insurance 699              716              17                   2%
Corporate Procurement 974              939              (35)                  (4%)
Financial Services 1,450           1,450           -                      0%
Revenues (500)             (500)             -                      0%
Transformation 740              740              -                      0%
Total for Financial Services 3,444           3,426           (18)                  (1%)
People & ICT
Employee Services 900              917              17                   2%
HR & Organisational Development 1,072           1,084           12                   1%
ICT 5,311           5,116           (195)                (4%) 1         
Business Support 1,258           1,258           -                      0%
Customer Services 3,981           3,981           -                      0%
Total for People & ICT 12,522         12,356         (166)                (1%)
Democratic Services
Legal & Licensing 496              486              (10)                  (2%)
Policy, Performance & Elections 468              401              (67)                  (14%) 2         
Communications 469              472              3                     1%
Civil Contingencies 60                60                -                      0%
Committee Services 541              528              (13)                  (2%)
Member Services 1,320           1,320           -                      0%
Ayrshire Support Service 410              416              6                     1%
Information Governance 57                49                (8)                    (14%)
Total for Democratic Services 3,821           3,732           (89)                  (2%)
Totals 19,931         19,663         (268)                (1%)
203

Page 204

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 16,985         16,921         (64)                  (0%)
Property Costs 67                69                2                     3%
Supplies and Services 3,081           2,888           (193)                (6%)
Transport and Plant Costs 24                24                -                      0%
Administration Costs 1,361           1,359           (2)                    (0%)
Other Agencies & Bodies 2,336           2,333           (3)                    (0%)
Transfer Payments 853              852              (1)                    (0%)
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 24,707         24,446         (261)                (1%)
Income (4,776)          (4,783)          (7)                    0%
Net Expenditure 19,931         19,663         (268)                (1%)
204

Page 205

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 People & ICT - ICT
Movement - There has been a favourable movement of £0.195m due to lower than forecast contract renewal
costs.
2,248 (195) -9%
Supplies & Services - £0.152m underspend in Software Licenses and support due to contracts ending and 
renewing at a lower cost.  However it is anticipated that the cost of Office 365 licensing will increase by 20% in
2024/25 requiring this years underspend to be earmarked to cover some of this increase. £0.043m underspend
in WAN due to the upgrade project although reinvestment of this budget is required to improve network
bandwidths at a number of council sites.
(195)               
Note 2 Democratic Services - Policy, Performance & Elections
Movement - There is a favourable movement of £0.010m in employee costs, this is due to slippage in
vacancies
447 (67) -15% Employee Costs - There is an underspend of £0.067m due to vacancy management.
(67)                 
205

Page 206

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 20,747         20,271            (476)                (2%) 1         
Primary Education 48,366         48,036            (330)                (1%) 2         
Secondary Education 61,492         61,415            (77)                  (0%) 3         
Additional Support Needs 13,730         14,312            582                 4% 4         
Education - Other 4,368           5,524              1,156              26% 5         
Pupil Equity Fund 4,604           4,604              -                      0%
Facilities Management 17,705         17,240            (465)                (3%) 6         
Connected Communities 12,801         12,801            -                      0% 7         
Net Total 183,813       184,203          390                 0%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 95,964         97,427            1,463              2%
Employee Costs - Non Teachers 57,629         55,915            (1,714)             (3%)
Property Costs 1,418           1,449              31                   2%
Supplies and Services 24,744         24,387            (357)                (1%)
Transport and Plant Costs 156              159                 3                     2%
Administration Costs 562              560                 (2)                    (0%)
Other Agencies & Bodies 13,798         14,418            620                 4%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 71                63                   (8)                    (11%)
Gross Expenditure 194,922       194,958          36                   0%
Income (11,109)        (10,755)           354                 (3%)
Net Expenditure 183,813       184,203          390                 0%
206

Page 207

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been a favourable movement of £0.478m compared to P3. This is primarily due to
vacancy management and changes in Funded Provider projections.
15,854 (274) -2% Employee Costs: Projected underspend of £0.515m in Early Years establishments due to vacancy
management which is offset against a projected overall Early Years budget shortfall of £0.242m.
4,672 (199) -4%
Third Party Payments: There is a projected underspend of £0.199m within payments to Funded Providers as a
result of a reduction in the number of NAC children accessing early years placements.
246 (3) -1% Other minor movements
A reduction to the budget of £1.198m in 23/24 has necessitated a drawdown from Education earmarked funds
pending permanent savings to be implemented for 24/25. Service redesign proposals are being developed.
(476)
Note 2 Primary Education
Movement : There has been an unfavourable movement of £0.065m compared to P3.   This is due to NDR re-
evaluations and increased RPI utility costs within the PPP Unitary Charge. This will be monitored over the
coming months and will be dependent on potential further PPP deductions income to offset the overspend.
45,985 (381) -1% Employee Costs : projected underspend in non teaching costs across all Primary Schools
2,222 62 3% Supplies & Services: projected overspend in the PPP unitary charge mainly due to NDR and utility increases
(11) Other minor movements
(330)
Note 3 Secondary Education
Movement : There has been a favourable movement of £0.031m compared to P3.   This is mainly due to
continuing recruitment gaps and vacancy management (£0.148m) and additional costs of £0.118m in NDR re-
evaluations and increased RPI utility costs within the PPP Unitary Charge.
46,742 (198) 0% Employee Costs : projected underspend in non teaching costs across all Secondary Schools
14,584 118 1%
Supplies & Services: projected overspend in the PPP unitary charge mainly due to NDR and utility increases.
All PPP costs and income will be monitored over the coming months and the final outturn will be dependent on
potential further penalty deductions to offset the overspend.
3 Other minor movements
(77)
Note 4 ASN
Movement: There has been an favourable movement of £0.054m compared to P3. This is mainly due to
movements in staff costs.
11,830 (284) -2%
Employee costs:  Projected underspend of £0.284m in non teaching staff costs across all ASN school and
bases provision. The increased cost pressure for Classroom Assistants of £0.874m is managed this year by
drawing down a temporary amount from earmarked funds. This position will be addressed as part of the
ongoing discussion with the Scottish Government and as part of the 24/25 budget process.
355 (76) -21% There is a forecasted underspend of £0.076m on payments to Other Local Authorities due to a reduction in the
number of NAC children accessing placements in their establishments.
1,003 49 5% There is a projected overspend of £0.049m on external day placements as a result of additional children
requiring this level of support and an increase in rates from these establishments.
499 905 181%
There is a projected overspend of £0.905m on external specialist residential placements.  Currently there are
10 children in accommodation with an additional 2 expected in the near future; 2 children have left education
provision in June 2023.  Increased pressures on internal care settings as well as changing needs of children
and young people have resulted in an increase in the need for external residential settings. Joint working is
ongoing with HSCP to ensure that all options are fully explored to ensure that all options are considered to
retain young people within their local community where possible.  Where this is not possible, a forum has been
set up to further discuss those young people who will require care and education provision to support them
appropriately.
Any future additional children who enter Residential Accommodation will increase the future projected
overspend.
- (12) Other minor movements.
582
207

Page 208

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Education Other
Movement :There has been an unfavourable movement of £0.990m compared to P3. This is mainly due to a
projected increase in teacher costs.
3,091 1,362 44%
Employee costs: Additional costs associated with Teachers as a result of Scottish Government's requirement
to maintain the same numbers as in the previous year. Expenditure is influenced by many factors including
Teachers absence where there has been an increase of approx 38% from previous years.
1,121 (201) -18% Income: PPP insurance rebate £0.087m, PPP deductions of £0.093m in excess of budget, £0.017m salaries
received from capital
(5) Other minor movements.
1,156
Note 6 Facilities Management
Movement: There has been a favourable movement of £0.102m compared to P3 mainly due to vacancy
management
13,285 (329) -2% Employee Costs: There is an underspend of £0.329m due to recruitment challenges and a targeted reduction
of overtime and casual costs.
6,403 (639) -10%
Supplies and services: There is a saving of £0.054m in food due to reduced commercial catering and a further
food savings of £0.347m due to reduced school meal uptake.  In addition, there is an underspend within Early
Years of £0.257m which has arisen due to a lower attendance rate than originally anticipated.
3,053 476 16%
Income: There is an under-recovery in commercial catering income of £0.382m due to a reduction in
commercial events and cost/income challenges within commercial venues, and an under-recovery of school
meal income of £0.166m. This is partially offset by an over-recovery of cleaning and janitorial income of
£0.072m.
27 Other minor movements.
(465)
Note 7 Connected Communities
Movement: There has been no change since period 3.
8,052 (148) -2% Employee Costs: Underspends in Community Facilities, Libraries, Country Parks and Community Development
due to vacancy management.
240 60 25% Property Costs: £0.033m overspend in Libraries on Furniture and Fittings and £0.025m overspend in Country
Parks on various property works and removal of trees affected by ash dieback.
1,102 48 4% Supplies and Services: Small overspends across a number of budget lines.
(2,140) 40 Income: £0.080m under recovery in Community Facilities as income has not returned to pre-covid levels and
projected over-recovery of £0.038m in Arran Outdoor Education Centre.
-
208

Page 209

Appendix 3
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 194              194               -                     0%
Housing and Public Protection
Building Services (2,543)          (2,543)           -                     0% 1         
Property Governance (7)                 (7)                  -                     0%
Planning Services 322              301               (21)                 (7%)
Protective Services 1,736           1,736            -                     0%
Other Housing 2,675           2,537            (138)               (5%) 2         
Total for Housing and Public Protection 2,183           2,024            (159)               (7%)
Commercial Services
Roads 8,504           8,504            -                     0%
Streetscene 5,188           5,188            -                     0%
Waste Resources 9,599           10,261          662                 7% 3         
Total for Commercial Services 23,291         23,953          662                 3%
Economic Development, Growth and
Regeneration
Economic Policy 229              196               (33)                 (14%)
Employability & Skills 1,955           1,955            -                     0%
Regeneration 1,221           1,192            (29)                 (2%)
Business 954              954               -                     0%
Growth & Investment 216              216               -                     0%
Total for Economic Development, Growth and
Regeneration 4,575           4,513            (62)                 (1%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,565           1,586            21                   1% 4         
Housing Assets & Investment (1)                 (1)                  -                     0%
Property Maintenance 3,494           3,519            25                   1%
Property Running Costs 4,664           4,775            111                 2% 5         
Energy and Sustainability 5,172           5,275            103                 2% 6         
Internal Transport 10,171         10,478          307                 3% 7         
Total for Sustainability, Transport and Corporate
Property 25,065         25,632          567                 2%
Net Total 55,308         56,316          1,008              2%
209

Page 210

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 47,361         47,887          526                 1%
Property Costs 21,394         21,641          247                 1%
Supplies and Services 10,214         10,320          106                 1%
Transport and Plant Costs 7,662           8,364            702                 9%
Administration Costs 793              795               2                     0%
Other Agencies & Bodies 20,643         21,181          538                 3%
Transfer Payments -                   -                    -                     0%
Other Expenditure 182              166               (16)                 (9%)
Capital Financing -                   -                    -                    
Gross Expenditure 108,249       110,354        2,105              2%
Income (52,941)        (54,038)         (1,097)            2%
Net Expenditure 55,308         56,316          1,008              2%
210

Page 211

Appendix 3a
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since P3 however the service are currently managing significant
financial challenges to achieve a break-even position..
5,345 111 2% Supplies & Services: An overspend of £0.111m in supplies and services. This is due to an overspend in
materials as a result of a change in the volume and  composition of the works programme.
579 142 25% Transport costs: An overspend of £0.142m in transport costs. This is due to an overspend of £0.078m in
scaffolding and £0.064m in skip hire costs.
2,833 569 20% Third Party Payments: An overspend of £0.569m in third party payments is largely in relation to an increase in
the volume of void and damp work.
(21,515) (822) 4% Income: There is a projected over recovery in income of £0.822m largely in relation to the volume and scope of
void works.
-
Note 2 Other Housing
Movement: There has been a favourable movement of £0.085m since P3 which is primarily due to increased
rents arising from demand for Temporary Furnished Accommodation.
3,839 (89) (2%) Employee Costs: projected underspend of £0.089m due to vacancy management.
2,395 20 1% Property Costs: projected overspend primarily due to £0.012m additional costs in property rents and £0.012m
in void rent losses.
(5,862) (78) 1% Income: favourable variance of £0.081m due to demand for Temporary Furnished Accommodation.
9 Other minor movements
(138)
Note 3 Waste Services
Movement: There has been a favourable movement since P3 of £0.416m mostly due to movements in the
recyclates markets.
5,132 756 15%
Employee Costs: The overspend includes temporary additional resources required to deal with new builds and
to cover a significant, and challenging, sickness absence rate. The statutory nature of the service requires
additional resources to cover unforeseen absences. A robust absence monitoring process is in place and an
overall review of the Waste service in light of legislative changes and current service demands is ongoing. This
will also take account of waste compositional analysis.
482 20 4% Supplies & Services: Forecast overspend on Trade effluent £0.023m.
160 223 139%
Transport Costs: Additional vehicles are temporarily in place to deal with pressures from new builds and
seasonal demands in Garden Waste, however a reduction of 3 vehicles has been implemented from 1st
October 2023.
(2,925) (348) 12% Income: Additional income from the renewal of kerbside recyclate contracts of £0.333m.
11 Other minor movements
662
Note 4 Property Management and Investment
Movement : There has been a favourable movement since P3 of £0.053m largely due to a reduction in internal
recharges.
2,582 (29) (1%) Employee Costs: A projected underspend of £0.029m due to vacancy management.
139 (69) (50%) Supplies & Services: Projected underspend due to reduction in internal recharges.
(1,263) 119 (9%) Income: There is a projected under-recovery in fee income of £0.119m.
21
Note 5 Property Running Costs
Movement : There has been a favourable movement since P3 of £0.011m.
6,349 112 2% Property Costs: There is a projected £0.112m overspend due to associated costs for community hubs within
SHUs. Discussions are ongoing regarding potential increased  costs.
(1) Other minor movements
111
211

Page 212

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 6 Energy and Sustainability
Movement : There has been an adverse movement of £0.029m since P3 due to increased projected utility
costs.
8,262 103 1%
Property Costs: Due to the current energy crisis and after drawing down the maximum available £3.048m from
contingencies and earmarked funds there is a projected overspend in property costs of £0.103m due to
increased utility cost charges.
A number of workstreams are ongoing to reduce consumption to reduce the above tariff related increases and
as part of our overall sustainability strategy.
103
Note 7 Internal Transport
Movement - There has been a favourable movement of £0.013m since P3.  This is mainly due to a projected
underspend in Fuel of £0.017m.
1,796 9 1% Employee Costs: Projected overspend of £0.009m due to lower than anticipated staff turnover.
4,668 169 4% Transport Provision Costs: Projected overspend of £0.168m due to an increase in contractors operating and
running costs which has resulted in higher contract pricing.
1,779 (17) (1%) Fuel: Projected underspend of £0.017m due to lower cost price.
385 76 20% External Hires: Projected overspend of £0.076m which is mainly due to additional hire of vehicles, due to
pending delivery of replacement vehicles.
1,117 70 6% Repairs & Maintenance: Projected overspend of £0.070m in repairs and maintenance which is due to price
increases and maximising the life of assets due to the increased lead time for replacement vehicles.
307
212

Page 213

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,257 2,251 (6)                 (0%)
SPT Concessionary Fares 286 291 5                  2%
Ayrshire Joint Valuation Board 965 932 (33)               (3%)
3,508 3,474 (34)               (1%)
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
12,377 11,805 (572)             (5%) 1           
Housing Benefits 2,587           2,487           (100)             -4% 2           
20,717 20,011 (706)             (3%)
213

Page 214

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Other Corporate Items
There has been an adverse movement of £0.249 since Period 3 primarily due to a revised drawdown of
centrally held inflation provision to support pressures within services.
12,377 (572)               -5%
The projected underspend is primarily related to centrally held inflationary cost provisions  which are being
applied to offset pressures reported across other services. The impact of inflation will continue to be monitored
throughout the year.
(572)
Note 2 Housing Benefit
There has been a favourable movement of £0.133m from Period 3 due to the revised Housing Benefit
overpayment recoveries.
2,587 (100)               -4% Projected underspend of £0.100m due to the provision of Housing Benefits and overpayment recovery.
(100)
214

Page 215

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 12,729 12,729 - -
Contribution to Loans Fund Reserve 4,811 4,811 - -
Scottish Government Funding (347,490) (347,490) - -
Council Tax (65,397) (65,397) - - 1
Use of Earmarked Funds (6,166) (6,166) - -
Net Total (401,513) (401,513) - -
There has been a significant increase in the value of CTR claims received to date, £0.379m. This has been offset
by reduced bad debt provision and the utilisaton of centrally held cost of living provisions.
Note 1 Council Tax
215

Page 216

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,504 5,209 (295) (5%) 1
Property Costs
Responsive Repairs 7,189 7,173 (16) (0%)
Void Repairs 3,577 4,584 1,007 28%
Planned and Cyclical Maintenance 4,920 4,906 (14) (0%)
Aids and Adaptions 1,617 1,617 - 0%
Other property costs 5,414 5,475 61 1%
Total for Property Costs 22,717 23,755 1,038 5% 2
Supplies & Services 672 656 (16) (2%)
Transport Costs 28 28 - 0%
Administration Costs 1,892 1,908 16 1%
Third Party Payments 3,519 3,519 - 0%
Transfer Payments 172 172 - 0%
Other Expenditure 380 380 - 0%
Capital Financing Costs 23,309 16,182 (7,127) (31%) 3
Gross Expenditure 58,193 51,809 (6,384) (11%)
Income
Council House Rents (56,803) (55,845) 958 (2%)
Other Rents (332) (332) - 0%
Recharges (828) (828) - 0%
Other Income (230) (218) 12 (5%)
Total Income (58,193) (57,223) 970 (2%) 4
Net Expenditure - (5,414) (5,414)
216

Page 217

Appendix 6a
HRA
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
5,504 (295) -5%
(295)
Note 2
22,717 1,038 5%
1,038
Note 3
23,309 (7,127) -31%
(7,127)
Note 4
(58,193) 970 -2%
970
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/23
£m £m £m £m £m £m
4.709 - - 5.414 (2.648) 7.475
1.500 - - - - 1.500
5.000 - - - (1.417) 3.583
0.198 - - - - 0.198
0.123 - - - - 0.123
0.781 - - - - 0.781
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.270 - - - - 0.270
13.685 - - 5.414 (4.065) 15.034
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works
Section
Employee costs
An underspend in employee costs of £0.295m. This is due to vacancy management.
Movement - there has been a favourable movement of £0.295m since Period 3 due to vacancy management.
Income
Movement - There has been an adverse movement of £0.970m since period 3 as a result of reduced income in
Council House Rents of £0.958m.
There is a projected under recovery of  income of £0.970m. Rental Income is projected to be under recovered by
£0.958m as a result of protracted and Long term voids. 
Property Costs
Movement - there has been an adverse movement of £1.038m since Period 3.
A projected overspend of £1.038m in Property Costs. This is largely due to a projected overspend of £1.007m in
Void Repairs as a result of an increase in the volume and scope of the works. Work is being undertaken to identify
efficiencies and reduce void costs.
HRA reserves and balances
Capital Financing Costs
There is a projected underspend in capital financing costs of £7.127m due to lower than anticipated loan charges. 
This is due to the profiling within the HRA Capital budget and the continued under borrowed position as the council
utilises internal funds in line with the Treasury Management and Investment Strategy. The underspend will be
reflected in the Business Plan which is currently being reviewed.
Movement: There has been a favourable movement of £0.765m since P3 as a result a projected under-borrowed
217

Page 218

Appendix 7
1) Budget Virements
Place
Roads - Supplies and Services T 0.177
Roads - Third Party Payments T 0.073
Roads - Income T -0.250
0.000
Budget Management - 31 August 2023
Virement/Budget Adjustment Requests
2023/24
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m
218

Page 219

Appendix 8
Integration Joint Board
12th October 2023
Subject : 2023-24 – Month 4 Financial Performance
Purpose : To provide an overview of the IJB’s financial performance as at
month 4 (July). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected year-
end overspend of £3.859m;
(b) notes the progress with delivery of agreed savings;
(c) notes the actions which are being taken to progress financial
recovery;
(d) notes the remaining financial risks for 2023-24; and
(e) approves the budget reductions which are detailed at
paragraph 2.10. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected expenditure
and income commitments; these have been prepared in conjunction with relevant
budget holders and services.   It should be noted that, although this report refers to
219

Page 220

the position at the end of July, further work is undertaken following the month end to
finalise projections, therefore the projected outturn position is as current and up to
date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £3.859m (1.2%) for 2023-24.  This
includes the financial impact of the NHS pay award but excludes the Council pay
award. 
1.3  From the core projections, overall, the main areas of pressure are residential
placements for children, supplementary staff in wards and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 4 
At month 4 against the full-year budget of £310.286m there is a projected year-end
overspend of £3.859m (1.2%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £3.507m in social care services and a projected
overspend of £0.352m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £89.932m there is a projected overspend of £0.240m
(0.3%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£0.430m (£0.259m favourable movement). The projected costs reflect the recently
agreed National Care Home Contract (NCHC) rates. 
220

Page 221

The budgeted number of permanent placements is 780 and at month 4 there are
774 placements.  The projection assumes that the current number of placements
will continue to increase to 780 placements by the end of the year. Within the
projection there is an assumption that recent placements which do not have a
completed financial assessment (often due to the pressure to discharge from
hospital) are costed with 50% of the cases at the current average cost of a
placement and 50% at the gross or interim funded rate.  It is likely that there will
still be some cases being gross or interim funded at the year end. Their actual cost
will not be known until the financial assessment is completed and this can impact
on the final position. 
The level of income recovered from charging orders is included in the projection
above and is assumed to be £0.100m over recovered based on the income
received to date.   This income is not easy to project as it depends on the length
of the legal process and time taken to sell the property that the charging order is
registered to. 
b) Care at home (in house and purchased) is projected to be £0.749m underspent
(£0.112m favourable).  The position is made up of an underspend in in-house
services of £1.242m as there are vacant posts, but some of the current capacity is
being met by existing staff working additional hours and casual staff.  Bank staff
are being offered contracts and additional staff are being recruited which will
replace the need for existing staff to work additional hours. This is partly offset by
an overspend in purchased services of £0.493m following a budget reduction
reflecting the transfer of services in-house. 
c) Reablement services are projected to be £0.125m (£0.004m favourable)
underspent due to vacancies. 
d) Care at Home Charging Income is projected to under recover by £0.080m (no
change) due to an ongoing shift towards personal care which is non chargeable. 
e) Physical Disability Care Packages (including residential and direct payments) -
projected underspend of £0.169m (£0.017m favourable) in community care
packages, £0.366m underspend (£0.074m favourable) in direct payments and
£0.565m overspend (£0.046m favourable) for residential placements. There is also
an under-recovery of income of £0.133m (£0.002m favourable).   
f) Anam Cara is projected to overspend by £0.089m (£0.088m favourable) due to
covering vacancies and sickness absence (£0.033m) and under-recovered income
(£0.056m).   The improvement in the projection is following a review of the staff
costs and some costs have been appropriately recoded to other areas of the
service. 
g) Integrated Island Services is projected to be £0.136m overspent (£0.119m adverse
movement). This is mainly due to a projected underspend in care at home costs of
£0.169m (£0.029m adverse movement).  There is also an overspend at Montrose
221

Page 222

House of £0.157m (adverse movement of £0.061m) which relates to supplies and
cleaning costs and an under-recovery of charging income. The SLA for Scottish
Ambulance service projected to overspend by £0.033m. Arran medical services
are projecting to overspend by £0.045m and the remaining £0.049m projected
overspend is due to supplies costs increasing. There are staffing vacancies which
are included within the payroll turnover savings figures below which offset the use
of agency and bank staff. 
h) District Nursing is projected to overspend by £0.247m (£0.022m adverse
movement) due to an overspend on bank nursing costs and supplies.   
i) Rehab wards are projected to overspend by £0.258m which is an £0.008m
favourable movement (Redburn ward £0.211m overspent and Douglas Grant
£0.047m overspent).  The overspend is due to cover costs for vacancies as well
as supplementary staffing for patients who require one to one support.   
j) Wards 1 and 2 are projected to overspend by £0.750m due to increased use of
supplementary staffing.   
k) Cumbrae Lodge Continuing Care beds are projected to underspend by £0.150m
(no change) due to a reduced charge to reflect the reduction in beds used during
the transition to the new service. 
2.4 Mental Health Services 
Against the full-year budget of £102.479m there is a projected overspend of £1.556m
(1.5%) prior to the reallocation of the Lead Partnership overspend to East and South
HSCP.  This also excludes any potential variance on the Mental Health Recovery and
Renewal Funding where any underspend will be earmarked at the year-end for use in
2024-25. The main variances are: 
a) Learning Disabilities are projected to overspend by £0.695m (£0.004m adverse)
and the main variances are: 
• Care Packages (including residential and direct payments) - projected
underspend of £0.264m in community care packages and projected
overspends of £0.204m in direct payments and £0.579m for residential
placements.   
• Trindlemoss non-employee costs are projected to underspend by £0.075m. 
b) Community Mental Health services are projected to underspend by £0.044m
(£0.159m adverse movement) which is mainly due to an underspend of £0.207m
in community packages (including direct payments) and an overspend in
residential placements of £0.268m.  The adverse movement is due to an increase
in the number of residential placements. 
222

Page 223

c) The Lead Partnership for Mental Health is projecting to be £1.029m overspent
(£0.381m favourable movement) and the main variances are as follows: 
• A projected overspend in Adult Inpatients of £0.667m (£0.067m adverse
movement) due to overspends in supplementary staff, staff in redeployment,
staff cover due to sickness (inc covid outbreak) and reduced bed sale income.  
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.106m (£0.039m adverse movement) based on current number of
placements and enhanced costs remaining until the year end. These
placements are for individuals with very specific needs that require a higher
level of security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women, people
with a learning disability or people with neurodevelopmental disorder. This can
necessitate an UNPACs placement with a specialist provider which can be out-
of-area.  The nature of mental health UNPACs spend is that it is almost
exclusively on medium or long term complex secure residential placements
which are very expensive so a small increase in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions between
units or levels of security can take many months. Applications to approve a
placement are made to the Associate Medical Director for Mental Health who
needs to be satisfied that the placement is appropriate and unavoidable prior
to this being agreed. 
• A projected overspend in MH Pharmacy of £0.024m (£0.094m favourable) due
to an increase in substitute prescribing costs. The favourable movement is due
to a review of the pharmacy cost centres with each now being allocated to
specific wards.
• Learning Disability Services are projected to overspend by £0.419m  (£0.007m
favourable movement) due to high usage of supplementary staffing, a number
of out of area patients being cared for, cross-charging for a LD patient whose
discharge has been delayed and redeployment staffing costs. Supplementary
staffing costs relate to backfill for sickness, increased and sustained enhanced
observations and vacancies.  The enhanced observations are reviewed on a
daily basis.
• Elderly Inpatients are projected to overspend by £0.257m (£0.017m adverse)
due to the use of supplementary staffing.  
• The Innovation Fund is projected to underspend by £0.278m (£0.049m
favourable) due to slippage within some of the projects and not all of the funding
was allocated.
• Addictions in-patients are projected to overspend by £0.045m (£0.105m
favourable) due to the use of supplementary staffing.  The favourable
movement relates to the Scottish Govt funding for 2023/24 being finalised.
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.233m (£0.198m favourable)
in 2023-24, further information is included in the table below: 
223

Page 224

The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• CAMHS £0.592m
• Mental Health Admin £0.358m
• Psychiatry £0.374m
• Psychology £0.683m
• Associate Nurse Director £0.099m 
Vacancy Savings Target (£0.873m)
Projected to March 2024 £2.106m
Over/(Under) Achievement £1.233m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £39.037m there is a projected overspend of £5.600m
(14.3%) (£0.015m favourable) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£5.308m (£0.304m favourable). The main areas within this are noted below: 
• Children’s residential placements are projected to overspend by £5.648m
(£0.320m favourable). We started 2023/24 with 32 external placements and
there are currently 34 placements (month 3 was 36 placements) which are
assumed to continue until the end of the year.  Within the £5.648m there is
£0.145m relating to enhanced costs for two placements.  Despite the number
of placements reducing there has been an increase in the rates where 2:1
support is required and part of these costs were also backdated. There are a
number of factors leading to this challenging position:
• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100%+ occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking Children
(UASC) under the National Transfer Scheme and to support Trafficked
young people located in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements the most cases is
shared 50/50 with Education services. 
224

Page 225

Children’s Services are continuing to work with other services including
Education and Housing to address the challenges. A change programme is
being developed to respond to the pressures of residential care, further detail
of the scope and plan around this work will be presented to a future IJB. 
• Looked after and Accommodated Children (fostering, adoption, kinship etc) is
projected to be £0.411m underspent (£0.050m favourable) based on the
current number of placements. 
b) Children with disabilities – residential placements are projected to overspend
by £0.238m (£0.006m favourable). This is based on 8 current placements and
2 further placements which are expected to commence during September. 
Direct payments are projected to underspend by £0.143m (£0.004m
favourable).  Community packages are projected to underspend by £0.099m
(£0.099m favourable) based on 78 current number of packages and
assumptions around further packages until the year end. 
c) Residential respite – placements are projected to overspend by £0.049m (no
movement).    These short-term placements are used to prevent an admission
to full residential care.  There is one short term placement, but this could vary
throughout the year and have an impact on the projection. 
d) Children’s Houses Employee Costs – are projected to overspend by £0.100m
due to additional overtime costs. 
e) Head of Service – is projected to overspend by £0.321m (£0.016m adverse)
which is mainly due to the saving of £0.233m in relation to the staff
reconfiguration in the children’s houses which is not expected to be fully
achieved in 23-24.  There are also projected costs of £0.092m for the JII (Joint
Investigative Interview) project which is not funded. 
f) Universal Early Years – is projected overspend by £0.130m (£0.027m
favourable) and is mainly due to a projected overspend in care packages of
£0.080m. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line.  All
underspends in employee costs have contributed to the payroll turnover target. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.389m (£0.010m favourable) mainly due to a
projected underspend in the Carers Strategy funding. 
225

Page 226

2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £2.313m
(£0.354m favourable) and the main areas of underspend are: 
• An over-recovery of payroll turnover of £0.723m for social care services and an
over-recovery of payroll turnover of £0.553m for health services as outlined in
the table below.
• The Band 2 to Band 3 regrading costs are still being finalised but there is
£0.700m set aside to cover this as part of the agreed 23/24 budget paper. This
is included as an underspend as the overspends have been included in the
services above. An update on the adequacy of this provision will be provided
in future reports.
• There is projected slippage on the LD and MH transition funding of £0.468m
due to delays in children transitioning into adult services. 
The turnover targets and projected achievement for the financial year for Health and
Social Care services outwith the Lead Partnership is noted below: 
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £1.286m (42.7% of annual target) has been
achieved to date.   
Social Care Health
Services
Vacancy Savings Target (3.014m) (1.433m)
Projected to March 2024 3.737m 1.986m
Over/(Under) Achievement 0.723m 0.553m 
The health vacancy projection to the year-end is based on the month 4 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
The main areas at month 4 are: 
• Children and Families £0.417m
• Learning Disability £0.029m
• Management and Support   £0.120m
• Community Care Service Delivery £0.124m
• Rehab and Reablement £0.115m
• Locality Services £0.144m
• Integrated Island Services £0.167m
• Community Mental Health £0.073m 
226

Page 227

There have been no intentional plans to pause or delay recruitment and services have
actively continued to recruit; in some service areas it has proven difficult to fill posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2023-24 budget included £4.963m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 4
£m
Red - 0.273
Amber 2.245 0.322
Green 2.718 4.368
Blue - -
TOTAL 4.963 4.963 
b) The main area to note is that previous amber savings of £0.273m, relating to
the reconfiguration of staffing within Children and Families, have been
escalated to red.  Progress to date suggests that the timescale for this saving
will not be met and the full £0.273m will not be achieved in 2023-24 but this is
accounted for in the projected outturn.   
Work is ongoing to refresh the Transformation Plan to focus on the financial
challenges which the Partnership expects to face in 2024/25 and 2025/26. The plan
is critical to the ongoing sustainability of service delivery. This will be brought to the
IJB for approval alongside the budget plans for 2024/25. The Transformation Board
also has responsibility for overseeing the delivery of the plan and for ensuring that
projects remain on track. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving. 
227

Page 228

2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis…. without
the express consent of the Integration Joint Board.” 
Appendix C highlights the movement in the budget position following the initial
approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount
1 Budget transfer to pharmacy for 2 X Band 8a post –
Cardiology & Endocrinology
£0.054m
2 Multi-Disciplinary Team funds to Arran Medical
Group
£0.033m
3 Training grade adjustment – reduction in line with
the number of training posts.
£0.035m
4 Transfer budget for 5 hours per week for Band 2
Domestic to ACH Domestics for Ward 3 
£0.004m
5 Transfer of a Band 6 post to Unscheduled Care  £0.061m
6 Transfer budget for additional Band 2 domestic
hours for the Dunure ward per HIS recommendation 
£0.010m
7 Lymphoedema top slice – N/E/S Contributions from
prescribing 
£0.029m   
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB outturn position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis; this position is currently the default pending
further work to develop a framework to report the financial position and risk sharing
across the 3 Partnerships in relation to hosted or lead service arrangements, which
has been delayed by the requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
require to be shared with North. At Month 4 the MH lead partnership is projected to
overspend by £1.029m (£0.337m NRAC share for East and £0.294m for South). 
South HSCP – projected overspend of £0.440m of which £0.163m will be allocated
to North. The overspend is mainly due to an overspend of £0.208m in the community
store, £0.153m in the continence service and £0.078m in the Family Nurse
Partnership.
228

Page 229

East HSCP – projected underspend of £0.141m of which £0.052m will be allocated to
North. The overspend is mainly due to: 
Primary Care and Out of Hours Services   
There is a projected underspend of £0.189m on the Primary Care Lead Partnership
budget and includes a projected underspend in Dental services totalling £0.267m,
where staffing numbers are running at less than establishment. In addition, there are
projected reduced costs within Primary Care contracting and support £0.343m, largely
due to staff turnover. These reduced costs are partially offset by additional costs in
the GP element of Out of Hours services, as well as additional costs in the overnight
nursing service, totalling £0.469m, as well as a small overspend on projected staff
costs in Primary Medical Services £0.057m. Work is ongoing to address the Out of
Hours increased costs as far as possible over the course of the 2023/24 financial year.
This projected outturn position assumes funding will be allocated to fully offset Urgent
Care Pathway projected costs £1.254m, as well as Covid-19 Therapeutics projected
costs £0.240m 
Prison and Police Healthcare 
The £0.048m projected overspend at month 4 is largely due to increased costs
associated with the new national medical contract. 
Set Aside: - preparatory work is well underway with NHS Ayrshire and Arran and the
other Ayrshire partnerships to progress and develop the set aside arrangements to
fully implement the legislative requirement.  This includes arrangements in relation
to the use of Directions, Joint Commissioning Plans and overall progression towards
fair share allocations of resources. The North budget for set aside resources for
2023-24 is £35.547m.  This is based on the 2023-23 figure of £34.850m inflated by
the 2023-24 uplift of 2%.   
The annual budget for Acute Services is £409.7m.  The directorate is overspent by
£9.5m after 4 months. This is caused by increasing overspends on agency medical
and nursing staff, together with increasing drug expenditure. These have been
required due to the level of operational pressure being experienced, in common with
many other areas in Scotland. Several unfunded wards are open across both main
hospital sites.   
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Numbers of delayed discharges and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance.
229

Page 230

2.12 FOSTER AND KINSHIP CARER ALLOWANCES 
On 29th August, COSLA and the Scottish Government announced the agreement of a
new standard national allowance for foster and kinship carers across the country. In
the past, each area would set their own allowances but for the first time a national
minimum level has been agreed. This will be supported by £16m of new Scottish
Government funding. It is anticipated that the share for North Ayrshire will be in the
region of £0.475m and this will be confirmed in October.  An initial assessment is that
the funding approximately aligns with the additional estimated cost in North Ayrshire.   
North Ayrshire already pays in excess of the new national rates for all age bandings
except 16+. Where we already pay a higher rate, this will remain unchanged. 
The rates are detailed in the table below: 
Age Banding Existing NA rate New national rate New NA rate
0-4 £200.00 £168.31 £200.00
5-10 £200.00 £195.81 £200.00
11-15 £200.00 £195.81 £200.00
16+ £200.00 £268.41 £268.41 
The new rates will be backdated to 1st April 2023.  Further consideration will be
required re any future year uplifts to the new national minimum rate. 
2.13 FINANCIAL RECOVERY PROGRESS 
The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with
the available resource. 
Heads of Service have closely reviewed expenditure and have implemented actions
which have demonstrated a significant impact on the position, the projected year-end
position has improved by £0.736m since Month 3. The main contributors to this are
noted in the table below: 
Payroll turnover 292,000
Anam Cara staffing 88,000
Care Experienced Young People 304,000
Looked After Children 50,000
Care at Home 112,000
Transitions funding 60,000
MH Lead Partnership (NA share) 147,000 
Work is ongoing to further improve the projected position and an updated plan will
be included in the Month 6 report which will be brought to the November IJB.   
230

Page 231

This ongoing work is built on the following general principles: 
• Minimise impact on delayed discharges or patient flow during Winter
• Exercising professional judgement around the use of waiting lists where this
may have an impact elsewhere in the system
• Reviewing the need for more active management of non-frontline vacant posts
• The non-recurring use of reserves
• Working with East and South on lead partnership projections and impact on
North Ayrshire
• The potential for a freeze on non-essential spend
• Escalating levels of spend authorisation within the HSCP. 
As a contingency there is provision of £2m non-recurring funding set aside in the
reserves (appendix D) to contribute towards the 2023-24 position.   This would
reduce the current projected overspend to £1.859m. 
The IJB also holds a General Fund reserve balance of £6.448m of unallocated funds,
this would underwrite the risk of the remainder of the projected overspend if it cannot
be managed downwards in the coming months.  This would be a last resort as this
funding is non-recurring and it does not resolve the areas underlying the projected
overspend. 
2.14 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2023-24
budget during the year, these include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this.
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The Covid recovery process including the ability to change and improve
services following learning from the Covid response.
• Continuing risks associated with provider sustainability.
• The Local Government pay award is not settled for 2023-24 and negotiations
are ongoing; any increase above the budgeted 3% will impact on the financial
position unless additional funding is forthcoming.
231

Page 232

These risks will be monitored during 2023-24 and any impact reported through the
financial monitoring report. 
2.15 RESERVES 
The IJB reserves position is summarised in the table below. 
The ‘free’ general fund balance of £6.448m is held as a contingency balance, this
equates to around 2.3% of the initial approved IJB budget for 2023-24 which is within,
but towards the lower end, of the target range of 2%-4%. 
General Fund
Reserves Earmarked Reserves
Total  Debt to
NAC Free GF  External
Funding                      HSCP 
£m £m  £m £m £m
Opening Balance - 1 April 2023 - 6.448  6.997 4.219 17.664
2023-24 Draw Per the Budget
Paper - -  (1.252) - (1.252)
Current Reserve balances - 6.448  5.745 4.219 16.412 
The 2023-24 budget approved the use of £1.252m of previously earmarked reserves
to support a balanced budget position for 2023-24. The HSCP earmarked reserves
also includes a further amount of £2.0m which was agreed to support the financial
position during 2023-24. 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2023-24 from
within the available resource, thereby limiting the financial risk to the funding partners. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2023-
24. 
4. IMPLICATIONS 
4.1 Financial
The financial implications are as outlined in the report.   Against the full-year budget
of £310.286m there is a projected overspend of £3.859m. The report outlines the main
variances for individual services.   
232

Page 233

4.2 Human Resources
The report highlights vacancy or turnover savings achieved to date. Services will
review any staffing establishment plans and recruitment in line with normal practice
when implementing service change and reviews as per agreement with the IJB, there
is no intention to sustain the staffing capacity reduction on a recurring or planned
basis. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
None. 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran Director
of Finance and North Ayrshire Council’s Head of Finance after the report has been
finalised for the IJB. 
Caroline Cameron, Director
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk] 
233

Page 234

PUBLIC INFORMATION
2023-24 Budget Monitoring Report–Objective Summary as at 31st July 2023         Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 70,681 69,703 (978) 19,251 20,469 1,218 89,932 90,172 240 616 (376)
: Locality Services 28,207 27,999 (208) 5,332 5,578 246 33,539 33,577 38 306 (268)
: Community Care Service Delivery 36,717 35,938 (779) 0 0 0 36,717 35,938 (779) (728) (51)
: Rehabilitation and Reablement 2,190 2,188 (2) 0 0 0 2,190 2,188 (2) 1 (3)
: Long Term Conditions 944 1,024 80 10,244 11,020 776 11,188 12,044 856 1,029 (173)
: Community Link Workers 197 188 (9) 0 0 0 197 188 (9) (9) 0
: Integrated Island Services 2,426 2,366 (60) 3,675 3,871 196 6,101 6,237 136 17 119
MENTAL HEALTH SERVICES 29,726 30,252 526 72,753 73,783 1,030 102,479 104,035 1,556 1,898 (342)
: Learning Disabilities 22,971 23,665 694 545 546 1 23,516 24,211 695 691 4
: Community Mental Health 5,869 5,825 (44) 1,782 1,782 0 7,651 7,607 (44) (203) 159
: Addictions 886 762 (124) 1,784 1,784 0 2,670 2,546 (124) 0 (124)
: Lead Partnership Mental Health NHS Area Wide 0 0 0 68,642 69,671 1,029 68,642 69,671 1,029 1,410 (381)
CHILDREN & JUSTICE SERVICES 34,484 39,941 5,457 4,553 4,696 143 39,037 44,637 5,600 5,615 (15)
: Irvine, Kilwinning and Three Towns 3,151 2,986 (165) 0 0 0 3,151 2,986 (165) (83) (82)
: Garnock Valley, North Coast and Arran 3,139 3,072 (67) 0 0 0 3,139 3,072 (67) (175) 108
:Intervention Services 1,868 1,883 15 437 438 1 2,305 2,321 16 (84) 100
: Care Experienced Children & Young people 22,618 27,926 5,308 0 0 0 22,618 27,926 5,308 5,628 (320)
: Head of Service - Children & Families 1,071 1,474 403 0 0 0 1,071 1,474 403 305 98
: Justice Services 2,412 2,396 (16) 0 0 0 2,412 2,396 (16) (133) 117
: Universal Early Years 225 204 (21) 3,698 3,840 142 3,923 4,044 121 157 (36)
: Lead Partnership NHS Children's Services 0 0 0 418 418 0 418 418 0 0 0
CHIEF SOCIAL WORK OFFICER 1,852 1,463 (389) 0 0 0 1,852 1,463 (389) (379) (10)
PRIMARY CARE 0 0 0 53,378 53,337 (41) 53,378 53,337 (41) (56) 15
ALLIED HEALTH PROFESSIONALS 0 10,291 10,291 0 10,291 10,291 0 0 0
COVID NHS 0 0 0 0 (274) (274) 0 (274) (274) (275) 1
MANAGEMENT AND SUPPORT COSTS 7,192 6,083 (1,109) 4,787 3,583 (1,204) 11,979 9,666 (2,313) (1,959) (354)
NATIONAL COMMISSIONED SERVICE 0 0 0 3 3 0 3 3 0
FINANCIAL INCLUSION 1,335 1,335 0 0 0 0 1,335 1,335 0 (19)
OUTTURN ON A MANAGED BASIS 145,270 148,777 3,507 165,016 165,888 872 310,286 314,665 4,379 5,441 (1,081)
Return Hosted Over/Underspends East 0 0 0 0 (337) (337) 0 (337) (337) (462) 125
Return Hosted Over/Underspends South 0 0 0 0 (294) (294) 0 (294) (294) (403) 109
Receive Hosted Over/Underspends South 0 0 0 0 163 163 0 163 163 0 163
Receive Hosted Over/Underspends East 0 0 0 0 (52) (52) 0 (52) (52) 0 (52)
OUTTURN ON AN IJB BASIS 145,270 148,777 3,507 165,016 165,368 352 310,286 314,145 3,859 4,576 (736)
Over/
(Under)
Spend
Variance at
Period 3
Movement in
projected 
variance
from Period
3
TOTAL
Partnership Budget - Objective Summary
Council Health
2023/24 Budget
234

Page 235

PUBLIC INFORMATION
2023-24 Savings Tracker Appendix B
235

Page 236

PUBLIC INFORMATION
236

Page 237

PUBLIC INFORMATION
2023-24 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     121.408
Less Living Wage Fund not yet
allocated      (2.826)
Revised Budget     118.582
Resource Transfer 1-3 P 23.597
HSCP Fin Circ 3 1-3 T 0.013
Living Wage - final allocation  1-3 P 2.808
ICT Licences Various 1-3 P (0.012)
Island Funds  1-3 T 0.015
Facilities Management Costs -
Montrose House 1-3 P 0.387
West Road - Capital funded from
Revenue  1-3 T (0.300)
Care at Home – Draw from reserves 4 T 0.173
Roundings  T 0.007
Social Care Budget Reported at Month 4 145.270
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Baseline Budget     164.500
Month 10-12 Adjustments     2.473
MDT funding     0.828
Adjust for full year impact of part year
amounts     0.052
Revised Baseline     167.853
Baseline Funding Increase     2.164
Adjust for recurring funding     7.629
Adjust for non-recurring     2.434
Resource Transfer     (23.597)
2023/24 Opening Position     156.483
Net impact of Pan Ayrshire Pressures 1 P 0.028
Top Slicing Posts 2022-23 2   (0.054)
MDT Funds to Arran Medical Group 3   (0.033)
Training Grade Adjustments 3   (0.035)
Ward 3 Band 2 Domestic 3   (0.004)
V2 B6 to AHM233 3   (0.061)
Virement 12 Band 2 Domestic 4   (0.010)
237

Page 238

PUBLIC INFORMATION
Virement 18 Band 3 budget trf  4   0.019
Lymphoedema Top Slice RX 4   (0.029)
HD Ref 51 Band 2-4 4   0.054
Roundings 4   (0.001)
Anticipated budgets included in the
report but not yet in the ledger 4   8.659
Health Budget Reported at Month 4 165.016    
TOTAL COMBINED BUDGET      310.286 
238

Page 239

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Treasury Management and Investment Mid-Year Report
2023/24 
Purpose:  To provide Cabinet with a Treasury Management update for the
period 1 April to 30 September 2023. 
Recommendation:  That Cabinet agrees to (a) endorse the contents of the Treasury
Management and Investment Mid-Year Report for 2023/24
(Appendix 1); (b) note the Prudential and Treasury Indicators
contained therein; and (c) note the changes arising from the
review of HRA Loans Fund Advances. 
1. Executive Summary 
1.1 The Treasury Management and Investment Strategy and treasury management
indicators provide a framework for the Council's treasury activities to ensure the
effective control of the risks associated with those activities and the pursuit of
optimum performance consistent with those risks.   
1.2 This mid-year review report: 
• provides an update on performance to 30 September 2023; 
• updates the annual prudential indicators to reflect the latest information available
to the Council; 
• demonstrates that the treasury management activities carried out during the
period 1 April to 30 September 2023 have been consistent with the Treasury
Management and Investment Strategy 2023/24 and have complied with the
treasury management indicators set out in the Strategy; and 
• details the review of Loan Fund Advances and the resulting changes. 
2. Background 
2.1 The Chartered Institute of Public Finance and Accountancy’s Treasury Management in
the Public Services: Code of Practice 2021 Edition (the CIPFA Code) requires that
Elected Members are provided with regular monitoring reports on treasury
management activities.  The Treasury Management Strategy for 2023/24 was
approved by Council on 1 March 2023. 
Agenda Item 11
239

Page 240

This report is the Mid-Year Report, providing Cabinet with an update on treasury
management activities for the period 1 April to 30 September 2023.   
An annual report on the treasury management activities for the year will be presented
to Council following the end of the financial year. 
These reports ensure that the Council is meeting best practice in accordance with
CIPFA's Code of Practice. 
2.2 The 2023/24 Mid-Year Report is attached at Appendix 1 and covers: 
• Prudential and treasury indicators; 
• Borrowing and associated rates; and 
• Investments and associated rate of return. 
2.3 This report provides an update on performance to 30 September 2023 and the annual
prudential indicators to reflect the latest information.  It is a statutory duty for the
Council to determine and keep under review its approved borrowing limits and
prudential indicators.  Details within the report demonstrate that, during the period 1
April to 30 September 2023, the Council has operated within the authorised and
operational limits and prudential indicators as set out in the Council's 2023/24 Annual
Treasury Management Strategy Statement (TMSS). 
2.4 The Executive Summary of the Mid-Year Report provides a high level overview of
treasury management and performance, with more detail provided in the body of the
report.  Key points to note are: 
• the re-profiling of capital expenditure into future years and continued use of
internal resources have had an impact on all of the prudential indicators; 
• PWLB interest rates rose by around 1% during the period in both the long and
short term. 
• during the year to date the Council has undertaken no new borrowing . The 
Council has utilised internal short-term cash reserves to temporarily fund any
capital borrowing requirement to 30 September 2023; and 
• investment returns are marginally above the target and this is reflective of the
rising Bank of England base rate which increased from 4.25% to 5.25% during
the period to 30 September. 
2.5 Section 14 of the Local Authority (Capital Finance and Accounting) (Scotland)
Regulations 2016 allows Councils to vary the period and/or amount of the repayments
if they consider it prudent to do so. A review of the advance periods for the Housing
Revenue Account has been carried out, releasing £6.124m over the life of the 30 year
business plan. 
240

Page 241

3. Proposals 
3.1 It is proposed that Cabinet (a) endorse the contents of the Treasury Management and
Investment Mid-Year Report for 2022/23 (Appendix 1); (b) note the Prudential and
Treasury Indicators contained therein; and (c) note the changes arising from the
review of HRA Loans Fund Advances. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services 
Capital Financing Costs - the Council budgeted £17.241m for financing costs and
expenses on debt for 2023/24.  It is currently estimated that actual costs will total
£11.390m. This underspend will be transferred to the Loans Fund Reserve in line
with the previously agreed policy to support delivery of the capital investment
programme. 
Housing Revenue Account 
Capital Financing Costs - the Council budgeted £18.158m for financing costs and
expenses for debt in 2023/24. It is currently estimated that actual costs will total
£10.926m.   
In both cases, the main reasons for the underspends are a) the re-profiling of capital
expenditure into future years and b) the current strategy to utilise cash balances,
resulting in savings on external interest costs. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
241

Page 242

5. Consultation 
5.1 The Council's treasury advisors, Arlingclose Ltd, were consulted in the preparation of
this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Treasury Management and Investment Strategy 2023/24 – Council 1 March 2023 
242

Page 243

Treasury Management and
Investment Mid-Year Report 
2023/24 
243

Page 244

2 
Contents
1. Purpose 3 
2. Executive summary 4 
3. Prudential and treasury indicators 6
a. The Council’s Capital expenditure and financing 2023/24 6
b. The Council’s overall borrowing need  7
c. Limits to borrowing activity 8
d. Treasury position at 30 September 2023 9
e. Affordability PIs 13 
4. Investment rates in 2023/24 13 
5. Investment position for 2023/24 14 
6. Review of Loans Fund Advances 15 
244

Page 245

3
Treasury Management and Investment Mid-Year
Review 2023/24
1. Purpose
The Council is required by regulations issued under the Local Government in Scotland Act 2003 and
the Chartered Institute of Public Finance and Accountancy’s (CIPFA) Code of Practice on Treasury
Management (revised 2021) to produce a mid-year review of treasury management activities.  The
purpose of this mid-year review is to report the performance of the Council’s treasury operation and
how this measures up against the Council’s Treasury Management and Investment Strategy.  This is
done through the publication of updated prudential and treasury indicators for 2023/24.  
This report meets the requirements of both the CIPFA Code of Practice on Treasury Management (the
Code) and the CIPFA Prudential Code for Capital Finance in Local Authorities (the Prudential Code). 
During 2023/24, to meet the minimum reporting requirement, the following reports should be
submitted to Elected Members: 
• an annual treasury management and investment strategy (submitted to the Council on 1 March
2023)
• the capital strategy (submitted to the Council on 1 March 2023)
• a mid-year treasury update report (this report)
• an annual review following the end of the year describing the activity compared to the strategy
(will be submitted to Council in June 2024) 
Regulations place responsibility on members for the review and scrutiny of treasury management
policy and activities.  This report is, therefore, important in that respect, as it provides details of
treasury activities for the six months to 30 September 2023 and highlights performance against the
Council’s policies previously approved by members.   
245

Page 246

4
2. Executive Summary
During the six month period to 30 September 2023, the Council complied with its legislative and
regulatory requirements.   
The key prudential and treasury indicators for 2023/24 have been updated based on the latest
available information and will be used to assess performance at the end of the year. 
TABLE 1 
A summary of performance is provided below with more detailed information provided in the body of
the report. 
Capital Expenditure for both the General Fund and HRA vary from original estimates due to changes in
the profile of projects. Full details of all movements in the capital expenditure budgets are included in
the capital programme performance reports submitted to Cabinet throughout the year. 
The Capital Financing Requirement (CFR) is the underlying borrowing requirements of the Council. 
The reduction to the requirement during 2023/24 reflects the change in profile of the capital
programme. 
Gross Borrowing reflects the actual borrowing which has been undertaken. This is projected to be
lower than anticipated due to the revised profile of capital projects and the continued use of internal
funds, the latter being a key element of the Treasury Management Strategy to minimise costs. 
The Operational Boundary is the maximum we would anticipate borrowing to fund the current year
capital programme building in flexibility for the timing of the different funding streams and principal
repayments.  The in-year variance is linked to the continued use of internal funds and the re-profiling
of the capital programme. 
The Authorised Limit is set at 10% above the Operational Boundary to give some flexibility to raise
funds for future year capital investment. 
2023/24 2023/24
Prudential and treasury indicators Original Estimate Revised Estimate
£m £m
Capital expenditure (Indicator 1)
·             Non-HRA                   115.931                    105.637
·             HRA                   172.316                      36.253
·             Total                   288.247                    141.890
Capital Financing Requirement (CFR):
·             Non-HRA                   267.879                    271.785
·             HRA                   284.275                    176.011
·             Total                   552.154                    447.796
Gross borrowing (Indicator 4)                   490.154                    323.486
Operational Boundary (Indicator 5)                   571.667                    442.106
Authorised Limit (Indicator 6)                   628.834                    486.317
Investments (Indicator 8)
·             Longer than 1 year -  -
·             Under 1 year                     20.000                      36.900
·             Total                     20.000                      36.900
246

Page 247

5
The Council has a strategy of taking a combination of temporary and permanent borrowing in
recognition of the Council’s longer term borrowing requirements and the market rates available at
that time. This balances short term financial savings with longer term security of costs. During the
period 1 April to 30 September 2023 the Council undertook no new borrowing. 
There was a substantial rise in the cost of both short- and long-term borrowing over the last 18
months. The Bank Rate rose by 1% from 4.25% at the beginning of April to 5.25% at the end of
September. As a result, the Bank Rate was 2% higher than at the end of September 2022.   
Affordability of borrowing is measured by a number of indicators, including the impact of: 
• Percentage of financial costs relative to the net revenue stream of the General fund and
Housing Revenue Account. 
As at 30 September 2023 the above indicator shows estimated ratios of 2.6% and 20.2% for General
Fund and HRA respectively. Capital expenditure impacts on the revenue budget through financing
charges so it is essential the Council ensures the financing costs remain affordable and do not
constitute an excessive proportion of the revenue resources available. From a General Fund
perspective, the latest Scottish Local Authority average was 5.5%, therefore demonstrating a prudent
borrowing policy. For the HRA, the latest Scottish average was 22.7%. The level of loan charges is
deemed prudent and affordable within the framework of the 30 year Housing business plan. 
The average investment rate to 30 September 2023 was 4.47%, compared to a target of 4.25% and
actual in 2022/23 of 0.73%. The return secured this year to date reflects the Bank of England base rate
which has risen from 4.25% at the beginning of the financial year to 5.25% at 30 September.  The
Council’s objective when investing money is to strike an appropriate balance between risk and return,
minimising the risk of incurring losses from defaults and the risk of receiving unsuitably low
investment income.   
Other prudential and treasury indicators and supporting information can be found in the main body of
this report. 
Conclusion 
The Head of Finance confirms that long-term borrowing is only undertaken for a capital purpose and
the statutory borrowing limit (the authorised limit) has not been breached. 
247

Page 248

6
3. Prudential and Treasury Indicators for 2023/24 
The Prudential Code establishes a framework to ensure Councils demonstrate effective control over
levels of, and decisions relating to, capital investment activity including borrowing.  The Treasury
indicators are used to ensure that risk is managed and controlled effectively.  Together the Prudential
and Treasury Indicators consider the affordability and impact of capital expenditure decisions and set
out the Council’s overall capital framework. 
These indicators help the Council to demonstrate public accountability in relation to borrowing and
investments.  As part of this accountability this report will summarise the following: - 
• Capital activity during the year (section a);
• Impact of this activity on the Council’s underlying debt (the Capital Financing Requirement)
(section b);
• The actual prudential and treasury indicators (section a – e);
• Overall treasury position identifying how the Council has borrowed in relation to this debt, and
the impact on investment balances (section e);
• Detailed debt activity (section e); and
• Summary of interest rate movements in the year (section 4);
• Detailed investment activity (section 5). 
(a)  The Council’s Capital Expenditure and Financing 2023/24
(Prudential Indicator 1)
The Council incurs capital expenditure when it invests in its long term assets.  Capital Expenditure can
be funded in two main ways: 
• Financed immediately through the application of capital or revenue resources (capital receipts,
capital grants, revenue contributions etc.), which has no resultant impact on the Council’s
borrowing need; or
• If insufficient financing is available, or a decision is taken not to apply other resources, the
capital expenditure will give rise to borrowing, which is approved as part of the Council’s
investment plans.   
The tables below show the planned capital expenditure for 2023/24 and the latest forecast, alongside
the amount estimated to be financed in year and the amount which will give rise to borrowing. 
TABLE 2 
2023/24 2023/24
General Fund Original Estimate Revised Estimate
£m £m
Capital expenditure (Indicator 1)                   115.931                    105.637
Financed in year from external funding and reserves                     47.639                      52.200
Unfinanced capital expenditure                      68.292                      53.437
2023/24 2023/24
HRA Original Estimate Revised Estimate
£m £m
Capital expenditure (Indicator 1)                   172.316                      36.253
Financed in year from external funding and reserves                     56.640                      18.447
Unfinanced capital expenditure                    115.676                      17.806
248

Page 249

7
(b) The Council’s Overall Borrowing Need (the Capital Financing
Requirement) (Prudential Indicators 2 and 3)
This indicator outlines the Council’s Capital Financing Requirement (CFR).  The CFR is simply the total
historic outstanding capital expenditure which has not been paid from either a capital or revenue
resource and therefore needs to be funded from borrowing.  It is essentially a measure of the Council’s
underlying borrowing need. 
Part of the Council’s treasury activity is to meet the funding requirements for this borrowing need. 
The treasury management section organises the Council’s cash position to ensure that sufficient cash
is available to meet the capital plans and cash flow requirements.  This may be sourced through
borrowing from external bodies (such as the Government through the Public Works Loan Board
[PWLB] or the money markets), by utilising temporary cash resources within the Council or through
temporary borrowing from other local authorities. 
The Council’s underlying borrowing need (CFR) is not allowed to rise indefinitely.  The Council is
required to make an annual revenue charge, called the Loan Fund Principal Repayment.  This is
effectively a repayment of the borrowing need and it is charged to revenue over the life of the asset. 
This charge reduces the CFR each year. This differs from the treasury management arrangements
which ensure that cash is available to meet capital commitments.  External debt can also be borrowed
or repaid at any time, but this does not change the CFR. 
The total CFR can also be reduced by: 
• the application of additional capital financing resources (such as unapplied capital receipts); or 
• increasing the annual revenue charge 
The Council’s CFR for the year is shown in the following table and is a key prudential indicator.  The
opening balance excludes the PPP / NPD schemes because no borrowing is actually required against
these schemes, as a borrowing facility is included in the contract. 
Table 3 shows that, based on historic capital expenditure and this year’s capital expenditure, the
Council has a cumulative underlying borrowing need of £447.796m forecast at 31 March 2024.  This is
lower than the original estimate largely as a result of changes in the profile of capital projects. 
TABLE 3 
2023/24 2023/24
CFR Original Estimate Revised Estimate
£m £m
Opening Balance                   378.655                    384.064
Add unfinanced capital expenditure (General Fund and HRA per
Table 2)                   183.968                      71.243
Less Loans Fund Principal Repayments                   (10.469)                     (7.511)
Closing balance (Indicator 2)                   552.154                    447.796
Annual Change (Indicator 3)                   173.499                      63.732
249

Page 250

8
c) Limits to Borrowing Activity (Prudential Indicators 4 - 6)
Borrowing activity is constrained by the prudential indicators for CFR, gross borrowing and by the
authorised limit to ensure the Council operates its activities within well-defined limits. 
Gross borrowing and the CFR 
There is a need to ensure that gross debt does not, except in the medium term, exceed the total CFR
(i.e. the Council does not borrow more than it needs to fund its capital programme).  In exceptional
circumstances Councils are allowed to borrow to cover the current financial year plus the next two
financial years (i.e. to 2025/26).  This provides some flexibility to borrow in advance where this is
appropriate.   
Table 4 highlights the Council’s forecast gross borrowing position against the CFR and confirms that at
30 September 2023 the Council has complied with this prudential indicator as gross borrowing is
currently within its CFR.  The Council is currently under-borrowed by £201.359m due to the continuing
strategy to delay long-term external borrowing by utilising internal cash balances. 
TABLE 4 
As part of its annual Treasury Management and Investment Strategy the Council sets limits for external
borrowing which it is not normally expected to exceed.  These limits are explained below. 
The Operational Boundary 
The operational boundary is the expected maximum borrowing position of the Council during the year,
taking account of the timing of various funding streams and the recharge of principal repayments from
the revenue account.  Periods where the actual position varies from the boundary is acceptable
subject to the authorised limit not being breached. 
The Authorised Limit 
The authorised limit represents a limit beyond which external debt is prohibited.  Performance against
the approved strategy is monitored throughout the year and reported to Cabinet as appropriate.
However, ultimate responsibility for setting or adjusting this limit lies with full Council.  The current
limit is set at 10% of the Operational Boundary. 
Table 5 demonstrates that between 1 April and 30 September 2023 the Council’s gross borrowing was
within both the operational boundary and its authorised limit, by a significant margin due to the
continuing strategy to delay new external borrowing by utilising internal cash balances and changes in
the capital programme that have resulted in a reduced borrowing requirement.    
2023/24 2023/24 30 September 2023
Original Estimate Revised Estimate Actual
£m £m £m
Gross borrowing position (Indicator 4)                   490.154                    323.486                    246.437
CFR                   552.154                    447.796                    447.796
(Under)/Over Borrowed Position                   (62.000)                 (124.310)                  (201.359)
250

Page 251

9
TABLE 5   
(d) Treasury Position at 30 September 2023 (Prudential Indicators
7 - 11)
The Council’s debt and investment position is organised by the treasury management service to ensure
adequate liquidity for revenue and capital activities, security for investments and to manage risks within
agreed parameters.  Procedures and controls to achieve these objectives are well established through both
Member reporting and the Council’s Treasury Management Practices. 
Borrowing Strategy for 2023/24 
The Borrowing Strategy for 2023/24 anticipated bank interest rates remaining at 4.25% during 2023
before beginning to decline in 2024. Fixed borrowing rates were anticipated to remain steady. 
Variable, or short-term rates, were expected to be the cheaper form of borrowing over the period. 
Continued economic uncertainty has promoted a cautious approach, whereby investments continue to
be dominated by low counterparty risk considerations, resulting in relatively low returns compared to
borrowing rates. 
During the period April to September, UK gilt yields were volatile, mainly facing upward pressure since
early April following signs that UK growth had been more resilient, inflation stickier than expected, and
that the Bank of England saw persistently higher rates through 2023/24 as key to dampening domestic
demand. Gilt yields, and consequently borrowing rates, rose and broadly remained at elevated levels. 
On 30th September, the PWLB certainty rates for maturity loans were 5.26% for 10 year loans, 5.64%
for 20-year loans and 5.43% for 50-year loans. Their equivalents on 31st March 2023 were 4.33%,
4.70% and 4.41% respectively. 
A new PWLB HRA rate which is 0.4% below the certainty rate was made available from 15th June 2023.
Initially available for a period of one year, this discounted rate is to support local authorities borrowing
for the Housing Revenue Account and for refinancing existing HRA loans. 
As a result of the higher borrowing rates, the Council’s current strategy is to use internal funds instead of
borrowing. 
The following graph demonstrates that PWLB rates have remained relatively steady during the period April
to September 2023.   
Estimated Revised
£m £m
Average gross borrowing position 1 April to 30 September 2022 250.979
Maximum gross borrowing position 1 April to 30 September 2022 252.793
Operational boundary per Treasury Strategy 2022/23
(Indicator 5) 571.667 442.106
Authorised limit per Treasury Strategy 2022/23
(Indicator 6) 628.834 486.317
251

Page 252

10 
CIPFA’s 2021 Prudential Code is clear that local authorities must not borrow to invest primarily for financial
return and that it is not prudent for local authorities to make any investment or spending decision that will
increase the capital financing requirement, and so may lead to new borrowing, unless directly and primarily
related to the functions of the Council. 
Local authorities can borrow from the PWLB provided they can confirm they are not planning to purchase
‘investment assets primarily for yield’ in the current or next two financial years, with confirmation of the
purpose of capital expenditure from the Section 95 Officer.  Authorities that are purchasing or intending to
purchase investment assets primarily for yield will not be able to access the PWLB except to refinance
existing loans or externalise internal borrowing. 
The Council is not planning to purchase any investment assets primarily for yield within the next three years
and so is able fully access the PWLB. 
Borrowing Position for 2023/24 
To date in 2023/24, the Council has undertaken no new borrowing. The Council has used internal
short-term cash reserves to temporarily fund its capital borrowing requirement to 30 September 2023.   
In terms of outlook for the remainder of the year, based on current capital plans and replacement
borrowing requirements, it is estimated that the Council will borrow £75.294m this financial year, with
a forecasted planned under borrowed position of £100.000m at the end of March 2024. 
Rescheduling 
No rescheduling has taken place between 1 April 2023 and 30 September 2023.  The continuing rise in
gilt yields since early 2022 may result in some of the Council’s PWLB loans being in or close to a
discount position if repaid early. The Council continues to monitor the position. The Council has
£25.950m of LOBO loans with call dates within the next 12 month. The Council has liaised with its
treasury management advisors, Arlingclose, over the likelihood of the options being exercised. If the
option is exercised and an increased rate proposed, the Council currently plans to repay the loan at no
additional cost as accepting the revised terms would mean the Council would still have refinancing risk
in later years. If applicable, the Council will repay the LOBO loans with available cash or by borrowing
from other local authorities or the PWLB. 
252

Page 253

11
The Council’s treasury position (excluding borrowing by PPP/NPD and finance leases) at the 31 March
2023 and 30 September 2023 was as follows: 
TABLE 6 
All investments at 30 September 2023 mature within one year in line with the Treasury Management and
Investment Strategy (Indicator 9). 
The Liability Benchmark is a new indicator which compares the Council’s actual existing borrowing against a
liability benchmark that has been calculated to show the lowest risk level of borrowing. The liability
benchmark is an important tool to help establish whether the Council is likely to be a long-term borrower or
long-term investor in the future, and so shape its strategic focus and decision making. It represents an
estimate of the cumulative amount of external borrowing the Council must hold to fund its current capital
and revenue plans while keeping treasury investments at the minimum level of £10m required to manage
day-to-day cash flow. 
Following on from the medium-term forecasts in the table above, the long-term liability benchmark assumes
capital expenditure funded by borrowing will be in line with the 10 year capital plan and 30 year HRA
business plan respectively, loans fund advances on new capital expenditure based on asset life and income,
expenditure and reserves all increasing by inflation of 2.5% a year with any specific adjustments made for
planned use of reserves. This is shown in the following chart together with the maturity profile of the
Council’s existing borrowing:
31 March 2023 30 September
Principal Rate/ Return Principal Rate/ Return
£m % £m %
Fixed rate funding:
-PWLB                   178.167 4.72%                   177.917 4.76%
-Other Local Authorities                     15.000 1.62%                     16.152 2.71%
-Market                       1.449 8.83%                       1.418 9.03%
Variable rate funding:
-Market                     50.950 5.10%                     50.950 5.10%
Total debt (Indicator 7)                   245.566 4.63%                   246.437 4.72%
CFR                   384.064                    447.796
Over / (under) borrowing                 (138.498)                  (201.359)
Investments:
- internally managed                     31.456 0.73%                     36.900 4.47%
Total investments (Indicator 8)                     31.456                      36.900
2022/23 2023/24 2024/25 2025/26
Actual
£m
Estimate
£m
Forecast
£m
Forecast
£m
Loans CFR       384.1        447.8        685.4        725.6
Less Balance sheet resources      (160.9)      (155.3)     (107.4)       (92.6)
Net loans requirement       223.2        292.5        578.0        633.0
Liquidity allowance         10.0          10.0          10.0          10.0
Liability Benchmark       233.2        302.5        588.0        643.0
Existing Borrowing      (252.2)      (234.2)     (231.2)     (228.3)
Liability Benchmark
253

Page 254

12 
The maturity structure of the debt portfolio (Indicator 10) at 30 September 2023 is shown below and shows
the period when the Council is required to repay and/or refinance debt. It is important to ensure a
reasonable spread of debt to mitigate against high exposure levels in respect of refinancing.  The current
profile ensures this: 
TABLE 7 
The next indicator is used to manage risk and reduce the impact of adverse movement in interest rates.  This
sets a limit on the Council’s exposure to fixed and variable interest rates (Indicator 11). The Council
approved a limit on variable borrowing of £60.000m in the Treasury Management Strategy 2023/24.   
TABLE 8 
31-Mar-23 30 September 2023
Maturity Profile of Borrowing (Indicator 10) Actual Actual
£m £m
Under 12 months                      43.481                      45.100
12 months and within 24 months                       2.950                        2.950
24 months and within 5 years                       6.207                        9.907
5 years and within 10 years                     21.639                      29.439
10 years and within 20 years                     33.177                      35.227
20 years and within 30 years                       6.225                        6.225
30 years and within 40 years                   106.887                      92.589
40 years and within 50 years                     15.000                      15.000
50 years and above                     10.000                      10.000
Total Borrowing                   245.566                    246.437
2023/24 30 September 2023
Original Limits Actual
£m £m
Limits on fixed interest rates based on net debt (Indicator 11)                   628.834                    486.317
Limits on variable interest rates based on net debt (Indicator 11)                     60.000                      50.950
254

Page 255

13
(e)  Affordability Prudential Indicators (Prudential Indicator 12 - 14)
These Prudential Indicators assess the affordability of capital investment plans and provide an indication of
the impact of capital investment plans on the Council’s overall finances. The cost impact of borrowing
decisions are reflected in the Council’s budget as loan charges. 
The actual and estimates of the ratio of financing costs to net revenue stream indicator identifies the trend
in the cost of capital (borrowing and other long-term liabilities net of investment income) against the net
revenue stream. 
TABLE 9 
Capital expenditure impacts on the revenue budget through financing charges so it is essential the
Council ensures the financing costs remain affordable and do not constitute an excessive proportion of
the revenue resources available. 
From a General Fund perspective, the latest Scottish Local Authority average was 5.5%, thereby
demonstrating a prudent borrowing policy. 
For the HRA, the latest Scottish average was 22.7%. The level of loan charges is deemed prudent and
affordable within the framework of the 30 year Housing business plan. 
4. Investment Rates in 2023/24 
The Bank Rate has risen from 4.25% to 5.25% during the period April to September. The Council’s treasury
advisers, Arlingclose, currently project that the bank rate has now reached its peak at 5.25% and is
forecasting gradual reductions from September 2024.    
Estimate of ratio of financing costs to net revenue stream 2023/24 2023/24
(Indicator 14) Original Estimate Revised Estimate
£m £m
General Services 3.4% 2.6%
HRA 27.8% 20.2%
255

Page 256

14 
5. Investment Position for 2023/24 
Investment Policy 
The Council’s investment policy is governed by Scottish Government investment regulations, which have
been implemented in the annual treasury management and investment strategy, approved by Council on 1
March 2023.  This policy sets out the approach for choosing investment counterparties, based on credit
ratings provided by the three main credit rating agencies and supplemented by additional market data (such
as rating outlooks, credit default swaps, bank share prices etc.).   
All investments during 2023/24 have complied with our investment policy. 
Resources 
The Council’s cash balances comprise revenue and capital resources and cash flow monies.  The Council’s
cash resources at 30 September 2023 were as follows: 
TABLE 10 
Investments held by the Council 
The Council has maintained an average balance of £38.692m of invested funds and utilised cash balances
during the year in support of the under-borrowed position.   
The Council’s treasury management advisors, Arlingclose Limited, have five Scottish unitary authorities in
their client group and provide regular investment benchmarking information to the Council. North Ayrshire
Council’s average weighted rate of return on investments during the period 1 April 2023 to 30 September
2023 was 4.47% (0.80% for the period to 30 September 2022).  The actual rate of return on investments as
at 30 September for North Ayrshire Council was 5.09%.  Benchmarking information, comparing the Council’s
performance with the other Scottish Unitary authorities within the client group of Arlingclose, as at 30
September has not currently been published and will be presented as part of the annual review report to
Council in June 2024. 
The Council’s investment portfolio at 30 September included a £5m loan to Woking Borough Council until 23
October 2023. Woking Borough Council was issued with a Section 114 notice on the 7 June 2023 which
prevents the Council from entering into any new agreement or commitment for expenditure without the
explicit agreement of the Section 151 Officer until the Council has met to consider the s114 report. However,
contractual expenditure, including loan repayments remains necessary and allowable.   The Council can
confirm the full amount of the loan, including interest was recovered on the maturity date of 23 October
2023. 
The target investment rate for 2023/24 was 4.25% and the slightly higher weighted average return in
the first half of the year reflects the rising Bank of England Base Rate. 
We will continue to invest with approved counterparties in accordance with the approved strategy.  
Cash Balances 2023/24 Actual
£m
1 April 2023                     31.456
30 September 2023                     36.900
Change within 6 months                       5.444
256

Page 257

15 
6. Review of Loans Fund Advances 
Under the Schedule 3 of the Local Authority (Scotland) Act 1975, the Council operates a Loans Fund with the
purpose of undertaking borrowing in order to make advances to support capital expenditure and determining
the annual repayment to be charged to the General Services and HRA revenue accounts. 
At 31 March 2023, North Ayrshire Council’s Loans Fund included outstanding advances of £384.064m, due to
be repaid over the next 50 years, and projections for a further £478.126m of advances in support of the
approved General Services and HRA capital programmes. 
Section 14 of the Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016 allows Councils
to vary the period and/or amount of the repayments, if they consider it prudent to do so. 
Resulting Action 
The Council’s current policy is that all current and future loans fund advances should be calculated using the
Asset Life method, which aligns the repayment of advances to the Useful Economic Life (UEL) of the assets to
be acquired, and should be calculated using an annuity rate linked to the average interest rate of borrowing
undertaken by the Loans Fund 
It has been determined that there are sufficiently detailed records on which to base a recalculation of HRA
advances made since 2011/12, with all advances made after this date being examined to determine the most
appropriate UEL and then recalculated using the revised methodology detailed above. 
Impact of the Resulting Actions
Although there is no change in the overall level of Loans Fund advances to be repaid, this will result in the
reprofiling of the principal and interest payments based on the review of the UEL of the assets with a resulting
increase in the interest calculations over the next 54 years of £22.844m for the HRA and £17.461m for the
General Fund.   
The recalculation of payments within the HRA will result in reduced annual repayments over the period to
2040/41 which will be offset by increased payments in later years. 
It should be noted that these projections are based on the current Capital Programmes as approved by Council
and estimates within the 30 year HRA Business plan.  Any changes to the approved Programmes will impact
on the movement. 
Impact on the HRA Business Plan
The anticipated reduction in HRA Loan Charge Repayments will release £6.124m over the 30 year life of the
business plan and will support the investment within this period whilst aiming to keep rents affordable. 
257

Page 258

258

Page 259

NORTH AYRSHIRE COUNCIL 
7th November 2023 
Cabinet 
Title:   Year End Performance Reporting:  Council Plan Year
End Progress Report 2022-23; Annual Performance
Report 2022-23; and Local Government Benchmarking
Framework Analysis of 2023 Data Release 
Purpose: To advise Cabinet on progress of our Council Plan priorities. 
Recommendation:  That Cabinet agrees to: a) Approve the Council Plan year
End Progress Report and supporting performance measures
as set out at Appendix One, Two and Three; b) Approve the
Council Plan Annual Performance Report as set out in
Appendix Four; c) Note the status of the Council’s
performance indicators within the LGBF Analysis of 2023
Data Release at Appendix Five; and c) Refer this report to
the Audit and Scrutiny Committee for further consideration. 
1. Introduction 
1.1. Under the Local Government (Scotland) Act 1992 and Local Government in Scotland
Act 2003 we have a duty to demonstrate Best Value.  To ensure we are supporting
our residents, fulfilling our statutory duties and invite scrutiny, we actively manage
performance and develop our reporting to make it accessible.  Following Cabinet
approval, our corporate performance reports are published on our website www.north-
ayrshire.gov.uk/performance. 
1.2. This report combines three key Council Plan and corporate performance reports: 
• Our six-monthly Council Plan 2019-24 Progress Update (Year End 2022-23)
• Our Annual Performance Report 2022-23
• The Local Government Benchmarking Framework (LGBF) - Analysis of 2023
Data Release 
2. Background 
2.1. Our Council Plan 2019-24 was approved by Council in June 2019.  As our new Council
Plan 2023-28 was approved in June 2023, this 2022-23 year-end reporting cycle
marks the final reporting period for the 2019-24 Council Plan.   
2.2. The Council Plan 2019-24 Progress Update (Year End 2022-23) and accompanying
appendices provide detailed information on the progress made towards our strategic
priority outcomes.  The report includes key activities and case studies from across our
Council in a magazine style format.  It provides an overview of performance in the six
months up to 31st March 2023.  Areas of focus (next steps) are not included in this
report as these are reflected in our new Council Plan 2023-28.
Agenda Item 12
259

Page 260

2.3. Our Annual Performance Report 2022-23 summarises our performance across the
entire financial year.  As in 2021-22, to reduce duplication the Annual Performance
Report is a high-level summary with links to our more detailed six-monthly Council
Plan Progress Reports.   
2.4. The Local Government Benchmarking Framework (LGBF) Analysis of 2023 Data
Release provides information on how we compare to similar councils.  The LGBF is a
national framework collating performance information from across all 32 local
authorities and is specifically referenced within the Accounts Commission Strategic
Performance Information Direction. The Improvement Service, who administer the
LGBF, is currently exploring how to publish data more timeously, therefore though this
report mainly covers 2021-22 data as released during 2023, some information may
relate to more recent periods. Data is as downloaded in September 2023 unless
otherwise stated. 
3. Performance Summary 
3.1. Key Activities (October to March 2023) 
• £434million Capital Investment Programme was approved by Cabinet.  This will be
key to the economic recovery of North Ayrshire in response to the cost of living
crisis.
• £3.3million was allocated to minimise the increase in council tax to support our
residents.
• A £1.4million Early Intervention Fund was established to help address child poverty
and the cost of living.
• Public mini enquiries were introduced to capture real lived experience and inform
our Child Poverty Action Plan.
• We held the first Annual Promise Conference in November, the first in Scotland
attracting 130 attendees and chaired by two of our care-experienced young people.  
• 18,962 National Entitlement Cards have been used by our young people, providing
free bus travel.
• We awarded the tender for two Council owned solar farms on former landfill sites
at Nethermains, Kilwinning and Shewalton, Irvine.
• The formal opening of the £4.2million Lochshore Hub took place in October 2023.
• The first year of roundabout advertising has been successful.  28 locations have
been granted planning consent, generating £20,000 per year.
• 1,400 residents and 37 community groups from across all six localities contributed
to our budget consultation in January.
• Accessing Our Council, a key element of our ‘No Wrong Door’ approach is
progressing well.  Contact details have been rationalised to help direct our residents
to the support they need.
• Our Council has been recognised by Carers Scotland as a Carer Positive
‘Exemplary’ employer in Scotland. The award demonstrates the support our
Council provides for its employees who are working carers. 
260

Page 261

3.2. Council Plan Performance Indicators 
3.2.1. Appendix 2 details Performance Indicators from the Council Plan Performance
Framework, showing (where available) targets and a traffic light (Red, Amber,
Green) symbol to show whether:  The target level of performance has been
achieved (Green); is slightly adrift of target (Amber); or is significantly adrift of
target (Red). 
3.2.2. Analysis of the indicators is outlined in Table 1 below.  Where data is not available
for Year End 2022-23, the most recently available data up to the annual figure for
2021-22 is used.  85.7% of indicators where the status is known are on target or
slightly adrift of target as at 31st March 2023.  This greater than last year, when
79.3% of indicators had this status.  The two-year period covered below reflects
the impact of the gradual easing of restrictions during 2021-22. 
Table 1
Summary of Performance Indicator Status
Traffic Light Year End 2022-23 Year End 2021-22    
on target 17 (60.7%*) 18 (62.1%**)
slightly adrift 7 (25%*) 5 (17.2%**)      
significantly adrift 4 (14.3%*) 6 (20.7%**)
status unknown or
data only
5 (15.1% of all Council
Plan indicators)
5 (14.7% of all Council
Plan indicators)
* Of the 28 indicators where status is known
** Of the 29 indicators where status is known   
3.3. Council Plan Delivery Plan
3.3.1. Appendix 3 details the 39 actions from the Council Plan Delivery Plan.  The status
of sub-actions informs the overall action status.  
3.3.2. At Year End 2022-23, 87.2% of actions are either on target or slightly adrift of target
compared to 94.9% at Year End 2021-22. 
Table 2
Summary of Overall Action Status
Traffic Light Year End 2022-23 Year End 2021-22   
on target 33 (84.6%) 32 (82.1%)   
slightly adrift 1 (2.6%) 5 (12.8%)   
significantly adrift 5 (12.8%) 2 (5.1%) 
3.3.3. Following the approval of the new Council Plan 2023-28 any incomplete actions
relating to our new priorities were either absorbed into the new Council Plan
actions or included in Operational Plans as appropriate.  Any actions not directly
related to the new priorities were closed.
261

Page 262

4. Local Government Benchmarking Framework 
4.1. In line with the Accounts Commission Strategic Performance Information Direction
2021, the PIs analysed within the LGBF framework directly relate to our priorities.  As
this report was produced in the transition period between the final reporting on the
Council Plan 2019-24 (when this performance was delivered) and our new Council
Plan 2023-28, the report includes measures included within both plans.   
4.2. In total 32 PIs closely relate to our priorities and are analysed within the report.  To
provide as close to a like for like comparison as possible, local authorities are grouped
based on similar levels of deprivation or rurality for each measure.  Trend information
is shown relating to the relevant family group alongside an explanation of performance. 
4.3. The Improvement Service states that as this dataset covers the second year of the
pandemic, most of the information relates to 2021-22, the data should be interpreted
within this context.   
4.4. The analysis clearly shows the impact of the pandemic across the majority of
indicators.  Though we continue to face significant challenges in North Ayrshire in
areas such as child poverty, rent arrears and business startups; there are also signs
of recovery and / or consistently good performance such as in employability support,
proportion of people earning the living wage, energy efficiency of our homes, the
percentage of invoices sampled paid within 30 days and the speed of crisis grant
decisions.  This demonstrates how we are actively working to support our residents. 
5. Proposals 
5.1. That Cabinet agrees to: a) Approve the Council Plan year End Progress Report and
supporting performance measures as set out at Appendix One, Two and Three; b)
Approve the Council Plan Annual Performance Report as set out in Appendix Four; c)
Note the status of the Council’s performance indicators with the LGBF Analysis of the
2023 Data Release at Appendix Five; and c) Refer this report to the Audit and Scrutiny
Committee for further consideration. 
6. Implications/Socio-economic Duty 
Financial 
6.1. None 
Human Resources 
6.2. None 
Legal 
6.3. This report confirms the arrangements for the Council’s compliance with its duties
under the Local Government (Scotland) Act 1992 and the Local Government in
Scotland Act 2003 and our commitment to improving public performance reporting. 
Equality/Socio-economic 
6.4. None 
262

Page 263

Environmental and Sustainability 
6.5. None 
Climate Change and Carbon 
6.6. None 
Key Priorities 
6.7. This report helps to demonstrate our Council’s delivery of our strategic priorities. 
Community Wealth Building 
6.8. There are no community wealth building implications. 
7. Consultation 
7.1. Feedback from the Executive Leadership Team (ELT) informed the content of this
report. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Hardy, Team Manager (Corporate Policy and
Performance), email: IslaHardy@North-Ayrshire.gov.uk. 
Background Papers
Council Plan 2019-24
263

Page 264

Council Plan 2019-24 Progress Update
Year End 2022-23 
Appendix 1
264

Page 265

Contents 
Our Performance at a Glance ............................................................................................. 1
Welcome ........................................................................................................................... 2
Our Council Plan 2019 - 2024 ............................................................................................. 3
Aspiring Communities – Key Activities................................................................................ 4
Aspiring Communities – Case Study ................................................................................... 8
Inspiring Place – Key Activities ........................................................................................... 9
Inspiring Place – Case Study ............................................................................................. 12
A Council for the Future – Key Activities ........................................................................... 13
Performance Summary .................................................................................................... 16 
The Corporate Policy, Performance and Elections Team welcome any feedback you may have.  We strive to make
our Council and reports as accessible as possible and appreciate opportunities to discuss how this can be achieved. 
For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
265

Page 266

Page 1 of 38 
20% our Modern
Apprenticeships
ringfenced for
those with a
disability or who
are care-
experienced
172 community and
partner
representatives
attended our
Tackling Child
Poverty mini
enquiries
Over 35,000 
new trees 
planted
£1.4m
Early
Intervention
Fund
established
Our two new
council-owned
Solar PV farms in
Shewalton and
Nethermains are at
the design phase
with the tender
awarded
£80,000 to develop
the skills of our
residents in Arran
and Cumbrae 
Electric Vehicle
charging
infrastructure
expanding
£3.3million to
support our
residents by
minimising the
increase of council
tax 
Our Performance at a Glance 
£434 million
Capital
Investment
Programme
approved for next
10 years
Community
Renewable Energy
Generation Funding
Scheme established 
New 
Financial Inclusion
Strategy 2023-28 
launched
Almost 19,000 Free
Bus Travel Passes
issued to those under
22 years of age 
266

Page 267

Page 2 of 38 
Welcome 
Welcome to the Year End Progress Report on our Council Plan.  This report covers the last six
months of 2022/23 and, following the approval of our new Council Plan 2023-28 by North Ayrshire
Council in June 2023, concludes our Council Plan 2019-24.
Challenges continue to be felt by our residents and communities in relation to the cost of living and
supporting our residents with these challenges remains a key area for our Council.  We delivered a
balanced budget, approved by Council on 1st March 2023 focussing on supporting our residents. This
included ensuring North Ayrshire’s council tax increase was lower than inflation.  We also allocated
£1.4m to our Child Poverty and Cost of Living Board to directly address the causes of poverty and
help our most vulnerable residents find a sustainable route out of poverty.
If you are in need of assistance with the cost of living, please visit this link to the North Ayrshire
Council Cost of Living Support webpage or call 01294 310000.
Our Strategic Housing Investment Plan (SHIP) continues to deliver a range of homes across all our
localities.  This includes general needs housing, wheelchair accessible and supported housing, with
831 homes (including employee units) delivered over the lifetime of our Council Plan 2019-2023.  
Our new SHIP 2023-2028 was approved by Cabinet in November 2022 and supports the Scottish
Government’s Affordable Housing Supply Programme.  This will see the further development of
homes for our residents across North Ayrshire.
Mitigating the impact of climate change is always at the heart of our projects.  This will be
increasingly evident over the next few years as our £434million Capital Investment Programme is
rolled out focussing on more sustainable developments and the longevity of our environment
including the creation of two new solar farms in North Ayrshire.  
Next steps and areas of focus are not included within this report as, following the approval by
Council of our new Council Plan 2023-28, it contains details on our new priority areas.
Together we can create a North Ayrshire that is Fair For All.   
267

Page 268

Page 3 of 38 
Our Council Plan 2019 - 2024 
Our Vision
A North Ayrshire that is ‘Fair for All’ 
Our Mission
Working together to improve wellbeing, prosperity
and equity in North Ayrshire 
Our Priorities
Aspiring Communities
♦ Active and strong
communities
♦ Children and young people
experience the best start in
life
♦ Inclusive, growing and
enterprising local economy
♦ Residents and communities
enjoy life-long health and
wellbeing
♦ Residents and Communities
are safe
Inspiring Place
♦ Well connected with
effective infrastructure
♦ Homes the meet residents’
needs
♦ Vibrant, welcoming and
attractive environment
♦ A sustainable environment 
A Council for the Future
♦ An accessible Council that
puts residents and
communities at the heart of
what we do
♦ An efficient Council that
maximises resources and
provides value for money
♦ A valued workforce that
delivers high quality services
♦ A powerful and respected
voice   
268

Page 269

Page 4 of 22 
Aspiring Communities – Key
Activities
Active and strong communities
Community Investment Fund
Cabinet approved the award of £45,000 of the
Community Investment Fund (CIF) to the Three Towns
Locality Partnership in conjunction the Community
Housing Advocacy Project (CHAP).  The award will
support the recruitment of a new community
outreach worker to support access to financial
services and advice to those residing in the Three
Towns who are struggling with the cost of living.  
£100,000 of funding was approved by Cabinet to
support a £600,000 3G football pitch at Winton Park
in Ardrossan through the Ardrossan Community
Sports Hub (ACSH).  The funding will help secure
further investment in the project.   
Participatory Budgeting
Funding bids for the two streams of participatory
budgeting closed in February.  Local groups across
North Ayrshire could apply for funding for locality
projects (up to £1,000 per project), or arts and culture
projects (up to £400 per project) with decisions made
by the community.
9,357 votes were received from across all six localities
and 128 community groups were successful in their
bids.  Each will receive a share of £109,777 provided
jointly by our Council and the Health and Social Care
Partnership.  A summary of the participatory
budgeting results can be found on our website.
Our Young People’s Participatory Budgeting Initiative
in December 2022 ensured 4,131 young people cast
three votes each for projects across our localities via
the online Young Scot’s voting platform or through
our schools and youth centres.  This resulted in nearly
100 youth projects receiving a proportion of £56,000. 
A full list of the winning projects can be found on our
website. 
Community Planning
The Community and Locality Planning Conference
took place on Saturday 28th January 2023 – the first
held since the Covid-19 pandemic.  Focussing on
community impact and placemaking, it attracted 70
attendees and positive feedback.   
To support a new approach to Locality Partnership
meetings, workshops have taken place with Elected
Members and senior officers to progress new
guidance and agenda formats.   
Islands Recovery and Renewal Pilot project
Significant progress has been made on the delivery of
the ten year local Island Plans launched in March
2022.  Developed with and for our island
communities, these aim to drive the development of
community, economic and environmental wellbeing. 
This includes: 
• Formation of Island Plan Delivery Working Group;
• Development of the North Ayrshire Islands Skills
Initiative Fund;
• Establishment of the Arran Housing Task Force;
• Delivery of the Cost Of Living Crisis Emergency
Fund; and
• Securing funding to support the delivery of Island
Plan actions with partners. 
Children and young people experience the
best start in life 
Child Poverty and Cost of Living Board
Our £1.4 Early Intervention Fund was approved by
Council in March 2023.  This consolidates some
previous funding such as the Cost of the School Day
Fund to more effectively deliver the work of the Child
Poverty and Cost of Living Board.  
Our Child Poverty and Cost of Living Board introduced
mini enquiries to inform how we address child poverty
in North Ayrshire.  Between October and March
representatives from our communities and
Community Planning Partners shared real lived
experience which directly informed our Child Poverty
Action Plan 2023-26 and Council Plan 2023-28.  These
will continue to inform the delivery of the Early
Intervention Fund.   
Tackling child poverty themes covered so far include:
• No Wrong Door Mini Public Enquiry - 5th October
2022 at the Redburn Community Centre, Irvine.  
269

Page 270

Page 5 of 22 
• Employability Mini Public Enquiry - 28th
November 2022 at Whitlees Community Centre,
Ardrossan.
• Food Mini Public Enquiry - 11th January 2023 at
the Volunteer Rooms, Irvine.  
• Islands – Arran Mini Public Enquiry - 13th
February 2023 at the Ormidale Pavilion, Brodick
and Cumbrae Mini Public Enquiry - 20th February
2023 in Garrison House, Cumbrae.  
Due to the varying challenges our islands face, over
£60,000 has been awarded to North Ayrshire through
the Scottish Government’s Island Cost Crisis
Emergency Fund.  It has been identified that those in
our island communities are facing steeper price rises
than those living on the mainland.  The award will be
available as follows:
♦ £30,000 to support third and voluntary sector
work on Arran and Cumbrae.
♦ £15,000 for additional study support for pupils in
Arran and Cumbrae and Largs Academy.  This
funding will also go towards family support
initiatives and visiting specialists to ensure that
children receive well-rounded and meaningful
experiences.
♦ £10,000 will support our Council’s Energy Smart
initiative helping support the improvement of
energy efficiency in homes and ultimately,
reducing the cost to our residents.
♦ £10,000 to support the Money Matters Service in
assisting access to benefits for our residents.   
The Promise
Our first Annual Promise Conference with Care-
Experienced Young People, senior leaders from across
the Community Planning Partnership, Scottish
Government officials including the Minister for
Children and Young People, and the Chief Executive
Officers of The Promise Scotland and Children’s First
was held on 4th November 2022.  This was the first
conference of this kind in Scotland.  130 people
including 23 carers and care-experienced young
people attended the conference.  The event was
chaired by two of our care-experienced young people. 
The themes of the conference were Relationships,
Voice and the United Nations Convention on the
Rights of the Child (UNCRC), and Whole Family
Support. 
Lockhart Campus Official Opening
Lockhart Campus held an official opening day on 27th
January 2023.  The new £20million Additional Support
Needs (ASN) School opened in August 2021 however,
due to the COVID-19 pandemic, no celebration to
mark the opening took place at that time.  Our young
people and teams delivered a music-filled afternoon
for invitees. 
Holiday Meal Programme
At the beginning of March, Cabinet approved a plan to
provide residents eligible for free school meals with a
direct cash payment rather than vouchers over the
Easter Holidays.  It was arranged for families to
receive the cash payment directly into their bank
account and was the equivalent of the cost of a school
meal per day.  We introduced the cash first approach
to provide families with more flexibility and better
value for money.  It also provides a more consistent
method for parents and carers where other supports
are already processed in this way.  Community
volunteers agreed to support an extensive food and
activity programme. 
270

Page 271

Page 6 of 22 
Free Bus Travel Scheme
18,962 National Entitlement Cards (NEC) and Young
Scot NECs have now been used to take part in the
national free bus travel scheme across North Ayrshire
- the third highest uptake across all 32 Scottish local
authorities.  Anyone aged between five and 21 years
old living in Scotland is eligible to use the scheme. 
Outdoor Learning
After the success of our outdoor literacy project ‘Go
Wild!’, the project has been extended to a further six
schools (12 schools participate in total).  Developed in
partnership with our Council’s Literacy Officer, the
aim of the project was to provide a programme of
outdoor learning opportunities encompassing literacy
that can be delivered by teachers.  Twilight ‘Go Wild’
sessions have been delivered by the Ranger Service
with another scheduled for May 2023.  A full day
session was delivered at Whiting Bay Primary School.  
An additional 13 schools are now looking to take part
in the project over the 2023/24 academic year.   
Inclusive, growing and enterprising local
economy
Community Wealth Building
We held Scotland’s first Community Wealth Building
(CWB) conference at Saltcoats Town Hall in October
2022 where over 100 stakeholders from across
Scotland attended including the Minister for
Community Wealth and Public Finance.
In February 2023, a Regional Economic Strategy for
Ayrshire with a CWB approach was approved by the
Ayrshire Economic Joint Committee.  
In March 2023, the CWB Commission was attended by
the Minister for Community Wealth and Public
Finance to discuss the Scottish Government’s CWB
Legislation Consultation
Also in March 2023, the first in-person meeting was
held for the Ayrshire Growth Deal CWB programme at
Ayrshire College, Kilmarnock.  100 attended and a
range of speakers presented including Ayrshire
businesses who have been supported by the
programme.   
Visitor Economy
Throughout 2022/23 we continued to support the
visitor economy sector to manage the impact of the
post Covid domestic tourism increase.  We
implemented our 2022 Visitor Management Plan for
the peak tourism season through coordinating and
increasing our focus on management of place assets
to maximise the experience for our visitors.  This
ensures our businesses get the benefit from increased
domestic tourism, while minimising impacts on
communities. This delivered over £2m investment in
support tourism. 
Procurement
Since October 2022, 20 Community Benefit wishes
have been delivered as part of our ongoing
“Community Benefits Wishlist”.  Community groups
can request donations or time from local suppliers
and can register ‘wishes’ for their communities via 
the online Wishlist Portal.  As at March 2023, there
are:
♦ 43 groups registered on the list.
♦ 91 wishes live.
♦ 2 wishes in discussion.
♦ 4 wishes in progress. 
Employability and Skills
During 2022/23, Employability and Skills ‘Step into
Business’ programme enabled 11 parents to complete
a PC Passport qualification leading to paid work
experience and the opportunity to complete an SVQ
Level II in Business Administration within an anchor
institution such as NHS Ayrshire and Arran, Ayrshire
College, Scottish Fire and Rescue and The Adolescent
and Children’s Trust (TACT).
To target school and college leavers, a careers event
attracted 30 employers and 400 young people.
Our Council embarked on a partnership with Ayrshire
College and the University of the West of Scotland
offering employees the opportunity to complete
qualifications whilst in work.  20 employees are being
supported to complete qualifications ranging from
SVQ Level II to degree level.
To support income from employment as a key driver
out of poverty, an Employability Child Poverty Action
Plan was created in order to help support parents in
271

Page 272

Page 7 of 22 
increasing their household income via gaining
employment or progressing with existing
employment.
The North Ayrshire Local Employability Partnership
launched a Corporate Parenting Action Plan to
increase fair work outcomes for care-experienced
young people.
To date, 36 people have been recruited to the
Streetscene Environment Skills Training Academy all
of whom are supported to gain qualifications while
working and earning the Living Wage as an employee
of North Ayrshire Council. 
Fair Employment
During 2022/23, the Fair Work Ayrshire Team has
engaged with 236 businesses. With 44 Ayrshire
businesses referred to secure real living wage
accreditation, 54 referred to secure disability
confident accreditation, and 43 referrals to Carer
Positive Scotland.   
Equal Programme Jobs Fair
Along with the Local Employability Partnership and
supported by Your Next Move - Working North
Ayrshire, the Equal Supported Employment
Programme arranged a jobs fair with a difference at
Lockhart Campus in February 2023.  Rather than a
traditional arrangement where jobseekers enter a
room of employers arranged in tables to see what
jobs are available, the aim was more of a ‘talent
showcase’ where employers toured the room of
potential candidates, gaining the opportunity to have
a coffee and more informal discussion.  At the fair, 20
residents with disabilities discussed their skills and
experienced with potential employers which resulted
in nine formal interviews, five work trials and three
job offers. 
Residents and communities enjoy good,
life-long health and wellbeing 
Active Schools
In partnership with North Ayrshire Young Carers
Team, Active Schools provided a variety of sport and
physical activity for young people and their families
attending the Young Carers Event.  This provided a
forum for discussion on barriers to participation in
sport where resources could be best focused.  
A Care Experience Event was also held in partnership
with the Corporate Parenting Team where Active
Schools delivered sport and physical activities that
young people could participate in with their parent or
carers.  This was another opportunity to provide
support and remove barriers to participation in sport
and physical activity across North Ayrshire.
Residents and communities are safe
Flood Risk Management
The second Ayrshire Flood Risk Management Plan has
been published.  The plan highlights areas across
Ayrshire that may be more susceptible to flooding.
The plan details the responses needed now to
alleviate future problems and empowers residents
with the knowledge to better protect themselves and
their properties.   
Millport Coastal Flood Protection Scheme
Work to start the £48million coastal flood protection
scheme for Millport has begun, with 80% funded by
the Scottish Government.  The project became
operational in 2021 when the detailed design
development started, with construction commencing
in March 2023.  The project end date is estimated to
be Autumn 2024.   Sheltered waters provided by the
completion of the offshore breakwaters will allow for
the construction of a step ashore marina. 
272

Page 273

Page 8 of 22 
Aspiring Communities – Case Study
North Ayrshire Island Skills Initiative (NAISI)
Arran and Cumbrae now have their own 10-year Strategic Local Island Plans and a dedicated Senior Islands Officer to
test new ways of working across stakeholders, whilst contributing to the delivery of the strategic objectives of the
Scottish Government’s National Islands Plan and principles of Community Wealth Building.  Through ongoing
engagement with our island communities on the Isles of Arran and Cumbrae, the following areas were repeatedly
highlighted as areas of concern:
♦ Economic growth, investment, and sustainability
♦ Community capacity and empowerment
♦ Education and skills and retention of young people
♦ Population and depopulation
♦ Recruitment and retention of employees 
We secured £80,000 of Scottish Government funding to develop and deliver a small-scale pilot and bespoke ‘North
Ayrshire Islands Skills Initiative’ (NAISI) project to support education and skills interventions on the islands of both
Arran and Cumbrae.  
The North Ayrshire Islands Skills Initiative (NAISI) ran from January – March 2023.  The fund was open to individuals,
up to the value of £1,500 and groups, businesses and partnerships up to the value of £10,000.  A grants application
process distributed skills development grants to seven island-based individuals and 19 island-based business in Arran
as well as six island-based businesses in Cumbrae, supporting a total of 32 skills initiatives.
The successful applications included a range of training interventions retaining young people and services on the
island.  This included training in veterinary nursing, paddleboarding, accountancy and MOT testing.
Feedback from skills fund beneficiaries include:
“It has helped by retaining a school age leaver and enabled him to develop further skills that not only allow our
business to explore new growth opportunities but also provided this individual with skills for life which he can use in
future employment.  This has resulted in the individual remaining on the island as appose to leaving to seek
employment on the mainland”.  
“This improves the likelihood of a vet surgery on Arran which is essential to community and island economy”.
“The good news is he passed his MOT Testing with flying colours!!  This gives us more flexibility within the business
and helps us to retain a young member of staff who appreciates the chance to receive this extra skill and deliver this
service on the island”.
This initiative supported the resilience of the island’s economy post-pandemic, whilst driving economic growth for
the future.
It is anticipated that this pilot will contribute to the sustainability of our islands.  The outcomes from this exclusive,
island pilot will inform the wider Ayrshire Growth Deal investment and Ayrshire Skills Investment Fund.  These have
inclusive economic growth as the key driver to tackle inequality, grow local talent, create new connections and
provide new opportunities and employment for people across our region including rural and island localities. 
273

Page 274

Page 9 of 22 
Inspiring Place – Key Activities
Well connected with effective
Infrastructure
Local Development Plan
The third Local Development Plan (LDP3) process
began in March, with a new online hub developed to
support the plan’s creation.  The hub outlines the
process involved in the creation of LDP3 and provides
the opportunity for residents to voice their views on
the future of their surroundings.  The first phase of
developing the plan runs until June 2023 and we aim
to adopt the plan in Summer 2026.  LPD3 will be the
framework from which all planning applications are
assessed for the following decade. 
B714 Upgrade
Following confirmation of the £23.7m award in
October 2021 from the UK Government's Levelling Up
Fund, we have continued to progress the design and
business case for the project.  Extensive consultation
has been undertaken with landowners and a broad
range of stakeholders. This included a public
consultation and exhibition in November and
December 2022 on the preferred option. Detailed
ground investigations and surveys including
environmental and ecological surveys are also
underway. The feedback and information obtained
from this process will inform the Business Case and
design development. Targeting submission to the UK
Government for approval in Autumn 2023. This
project is match funded by a £3m award from our
Council's Investment Fund. 
Ayrshire Growth Deal 
We have made progress on several of our Ayrshire
Growth Deal Projects. We have: 
• Completed our full business case for the i3
Flexible Space and Digital Process Manufacturing
Centre at i3 Irvine.
• Made our Digital Process Manufacturing Centre
building suitable for occupation.
• Secured partnership of National Manufacturing
Institute Scotland and University of Strathclyde as
having a presence as lead operator of a national
innovation centre for manufacturing.
• Launched consultation on the Irvine Harbourside
masterplan, which is key moving into delivery of
the Ayrshire Growth Deal (note in current
financial year we have appointed designers for the
regional play park/coastal hub which will be the
first delivery phase).
• Developed academic partnerships with University
of Stirling to support our blue economy ambitions
through the International Marine Science Centre
project and Hunterston.
• Continued development of our partnership with
Crown Estate Scotland, particularly to support
development of marine tourism projects.
Homes that meet residents’ needs
Strategic Housing Investment Plan
Our Council Strategic Housing Investment Plan (SHIP)
2023-2028 was approved by Cabinet in November
2022 and supports the Scottish Government’s
Affordable Housing Supply Programme (AHSP).  Both
the SHIP and AHSPs aims are to deliver affordable
housing for rent for our residents across North
Ayrshire and support our Council’s Regeneration
Delivery Plan to implement regeneration across sites
including town centres.  
At the beginning of 2023, work began on a new
housing development at Afton Court, Stevenston.  The
£1.3million development - with £600,000 of Scottish
Government funding - is expected to be completed by
late summer 2023 and will create six new amenity
bungalows delivered by a modular construction
method.  The bungalows will be built in a controlled
factory environment using sustainable practices
reducing waste and energy required.  Kitchens,
bathrooms, plumbing and electrics will all be installed
in the factory before the bungalows are transported
to site and moved into position.  Tenants of the
bungalows will benefit from the modern, energy-
efficient homes owing to the ultra-insulated building
envelope and the installation of air-source heat
pumps and photovoltaic (PV) panels.  
14 new homes will be built at sites as part of our
Estates Based Regeneration Programme.  The draft
plans were available online for our residents to
comment on and a consultation event was held in
Kilbirnie in February.    
274

Page 275

Page 10 of 22 
Irvine & Kilwinning
35 of the 71 units at Irvine Harbourside were
complete as at 31 March 2023 with the remaining 36
homes due to be provided to tenants during April
2023.   
The 79 homes at St Michael’s Wynd in Kilwinning
were completed during September 2022.  These
include general needs, amenity, wheelchair user
housing, sheltered housing and supported
accommodation. 
Arran Housing Task Force
In March we established our Arran Housing Task Force
as part of our Arran Island Plan commitment which
incorporates a wide range of partners aiming to find a
long-term resolution to the island’s housing
challenges.  Details of the demand for affordable
housing on the island – both location and type - will
be identified, as well as barriers to economic
sustainability and growth.
Vibrant, welcoming and attractive
environment
Moorings
We have agreed a three-year contract to install,
maintain and repair the visitor moorings at Arran and
Cumbrae.  Available throughout the season (April –
October) and located at Millport, Brodick, Lochranza,
Pirnmill and Whiting Bay, visitors can berth for up to
three nights on a visitor mooring at these locations,
with longer stays available at Lamlash, Largs, Fairley
Quay and Clyde Marina.  The development will attract
tourism to our island communities throughout the
warmer months and will enable visitors to stay and
enjoy our area.   
Millport Town Hall  
Renovation works to improve and restore the 144-
year-old Millport Town Hall building have begun. 
Funding for the project for Phase One was secured in
2021 with £1.865 million sourced from the Scottish
Government's Regeneration Capital Grant Fund
(RCGF), and a further £200,000 in Community
Investment Funding awarded by our Council and the
North Coast and Cumbraes Locality Partnership in
addition to £15,000 from the North Ayrshire Ventures
Trust (NAVT).   A further award of £0.509m was
secured from the Scottish Government's Islands
Programme for Phase Two of the project.  The
Millport Town Hall Charity has also raised £537,710
over the lifespan of the project which is a key example
of a locally led regeneration project.   
Capital Investment Programme
A £434million Capital Investment Programme has
been approved by Cabinet and will play a key role in
the economic recovery of North Ayrshire in response
to the cost of living crisis.  The investment will be
delivered over the next decade and the projects
covered by the investment will include:
♦ The Millport Flood Protection Scheme.
♦ Expansion of universal free meals in schools.
♦ The upgrade of the B714.
♦ Ardrossan Community Campus.
♦ Montgomerie Park Primary School.
♦ The solar PV farms at Shewalton and Nethermains
in Irvine.
♦ The decarbonisation of our Council’s transport
fleet.
♦ Street lighting.
♦ Playparks.
♦ Our cycling, walking, and safer routes programme. 
Inflation and increased costs have made it challenging
to manage the capital budget.  All projects are
approached with a focus on protecting the
environment and supporting our goal of becoming a
carbon-neutral council.     
Regeneration Delivery Plan
We developed and delivered Year Two of our
Regeneration Delivery Plan, focusing on the delivery
of physical regeneration across North Ayrshire
through an ambitious project based rolling action
programme. This was delivered using funding secured
from a range of sources including: 
• Scottish Government’s Place Based Investment
Programme: £1.093m 
• Scottish Government’s Vacant and Derelict Land
Fund: £1.32m 
• Scottish Government’s Vacant and Derelict Land
Investment Programme: £0.4m 
• Scottish Government’s Cycling Walking and Safer
Routes: £0.86m
• Strathclyde Partnership for Transport Capital
Programme: £1.385m
• Scottish Government's Islands Programme
£1.229m
275

Page 276

Page 11 of 22 
A sustainable environment  
Solar PV Farms
We have awarded the tender to deliver two Council-
owned solar farms.  The £12.8million project will see
the former landfill sites at Nethermains in Kilwinning,
and Shewalton in Irvine transformed into two solar
farms.  The detailed design phase is underway and
works are scheduled to start on-site early in the new
year.   The transformation to a source of green energy
use as part of our Council’s Environmental
Sustainability and Climate Change Strategy will see
sterile land brought back into productive use and
provide a significant amount of energy and income
that can be reinvested in the area.   
Community Renewable Energy Generation Funding
Scheme
We have established a Community Renewable Energy
Generation Funding Scheme (CREGFS).  The scheme
empowers communities to undertake renewable
energy initiatives.  It will enable community groups to
contribute to the net zero emissions by our 2030
commitment and accelerates community benefit from
local renewable energy generation.   
Lochshore Hub
The formal opening of our £4.2million Lochshore Hub
took place in October 2022, attracting approximately
1,000 attendees with a free family fun day.  The Hub
was funded by a range of sources including Scottish
Enterprise, Garnock Rugby Club, the Nuclear
Decommissioning Authority, the Scottish
Government’s Regeneration Capital Grant Fund and
Vacant and Derelict Land Fund. 
The preparation for planting 12 hectares of new
woodland at Lochshore, Kilbirnie, began in February
2023.  Following extensive groundworks, 17,000 trees
will be planted with the species being informed by the
ground conditions at the planting site.  A community
woodland area will be created, planted and managed
by the community.  The entire project aligns with our
Council’s ambition to achieve net zero carbon
emissions by 2030 which includes planting over
100,000 trees across North Ayrshire (over 35,000 new
trees have been planted to date).   
Electric Vehicle (EV) Charging Infrastructure
From October 2022 to March 2023 the following
publicly accessible charge points were installed:
♦ Skelmorlie Community Centre – 1 x 50Kw EV
Charge Point.
♦ Lockhart Additional Support Needs Campus – 1 x
7Kw EV Charge point.
♦ Clockhouse Car Park, Lamlash – 1 x 50 kw EV
Charge point.
♦ Arran Outdoor Education Centre – 2 x 7Kw EV
Charge points.
In addition, Cabinet approved the progression of an
Inter-Authority Agreement with East and South
Ayrshire to oversee and implement the expansion of
the public vehicle charging network across Ayrshire. 
The project will involve private sector investment and
grant funding from the Scottish Government to
deliver a total of 433 charging points across Ayrshire –
150 in North Ayrshire alone.   
276

Page 277

Page 12 of 22 
Inspiring Place – Case Study – Regeneration Delivery Plan 
The Regeneration Delivery Plan approved in March 2021 is informed by stakeholder consultation and community
priorities.  It aims to address local priorities, support changes within communities and deliver a wellbeing economy.
The Plan focusses on the delivery of physical regeneration across North Ayrshire and informs our priorities for
securing and delivering against external funding sources including Scottish and UK Government funds.  Action in
2022/23 focussed on maximising the impact and leverage of investment and accelerate delivery.  This includes
funding to support community led delivery.
The Action Programme is aligned to the four themes of the Delivery Plan which align with and deliver across our
Council Plan priorities. Key successes include:
Strengthening Communities
• Approval of the local delivery plans for the £1.32m annual allocation from the Scottish Government’s Vacant and
Derelict Land Fund (VDLF).
• Launch of the Repurposing Property Grant Fund to support landowners and communities to bring vacant and
derelict land and properties into positive management including two rounds of awards. 
• Conclusion of the sale of Sites A and B at Montgomerie Park, Irvine to enable the delivery of the Simplified
Planning Zone and commencement of construction.  Commencement of next phases including proposals for
neighbourhood retail site development.
Placemaking
• Approval of the delivery plan for the £1.096m allocation from the PBIP including implementation of the Place
Framework pilots in Kilwinning, Largs, Saltcoats and Lochshore Park. 
• Working in partnership with Ardrossan Community Development Trust to successfully secure £0.749m from the
Regeneration Capital Grant Fund (RCGF) for Ardrossan Promenade. 
• Completion and launch of key Phase 1 projects for the Lochshore Park Masterplan including the Hub building
and active travel route.  Commenced construction on the 5km loop and play at the Hub and secured £0.1m
funding from Forestry and Land Scotland for the delivery of new woodland.
Inclusive and Green Economy
• Design development and tender of Phase Three of Pavilion development at Annickbank, Irvine including securing
£0.25m from North Ayrshire Ventures Trust and £0.4m from the Scottish Government’s Vacant and Derelict Land
Investment Programme (VDLIP) towards the construction.
• Design development for the next phase of industrial unit development at Kyle Road, Irvine.
• Securing £0.509m from the Scottish Government Islands Programme for Phase Two of Millport Town Hall and
£0.540m for the Islands Pit Stop project.
Enabling Infrastructure
• Securing £1.385m from Strathclyde Partnership for Transport’s (SPT) Capital Programme for the delivery of a
range of active travel and transport projects across North Ayrshire.
• Securing £0.124m from the Smarter Choices Smarter Places for the continued delivery of the Trinity Active Travel
Hub and Travel Smart programme.
• Development and delivery of a £0.86m programme of active travel design and works under the Scottish
Government’s Cycling, Walking and Safer Routes programme.
A draft action programme is being prepared for 2023/24 and 2024/25 to align priorities with resource. This will be
informed by an assessment of progress to date, local priorities, project deliverability and funding. The
implementation of action programme projects aligned to competitive funding sources will however be dependent on
the success of the funding applications.
277

Page 278

Page 13 of 22 
A Council for the Future – Key
Activities
An accessible Council that puts residents
and communities at the heart of what we
do
Budget and Council Plan Consultations
1,400 residents completed the 2023/24 Budget
Engagement Survey in January 2023 in addition to in-
person events held across North Ayrshire’s six
localities attracting 37 community groups.  Our
residents were asked to rate services in order of
importance, provide their views on schools and
nurseries and offer opinions about our towns and
surrounding areas.  
These consultations informed our budget and the
development of our Council Plan 2023-28 priorities,
alongside real lived experience captured through the
Child Poverty and Cost of Living mini-enquiries and
other recent consultations for areas such as our
Community Plan and HSCP Strategic Plan.
Accessing Our Council and No Wrong Door
Our Accessing Our Council programme has continued
to progress.  Focus has been on our digital services,
with the review of our frequently used online
processes to identify and implement improvements
ensuring a streamlined customer journey across
services.  Phase One which rationalised the contact
details for our Council is complete, resulting in a
significant reduction in public facing telephone
numbers and email addresses on our website.  
The next phase of the project is focusing on the
implementation of the new Customer Services Digital
Team, the launch of the new Contact Us process for
contacting Council services, the new My NAC online
account and progressing our locality-based in-person
service provision.  
Accessing our Council contributes to a wider area of
work around ‘No Wrong Door’ where no matter how a
person contacts our Council, they are guided to
relevant support.  This approach is currently in
development, with an awareness raising campaign
due to begin in June 2023.  It has been directly
informed by the real lived experiences of our
residents and information from partners through our
No Wrong Door Mini Enquiry in October 2022. 
An efficient Council that maximises
resources and provides value for money
Council approved our budget on 1st March which has a
clear focus on ways to mitigate the impact of the cost
of living for our residents.  It was agreed that
£3.3million would be used to reduce the impact of the
rising cost of living for our residents by capping the
increase on council tax and making this significantly
lower than inflation.   In addition, our Council will
further invest in its Energy Smart Programme.  The
programme was put in place to help residents source
assistance with lowering their energy bills during the
winter (see Aspiring Communities section above).
Roundabout Advertising
The first year of advertising on roundabouts across
North Ayrshire has been positive.  Of the 24
roundabout locations initially granted planning
consent, 23 locations were sold within one week of
release.  £20,000 of income per year is generated by
this initiative.  28 locations have now been granted
planning consent.  The initial agreement period
extends to September 2024.
A valued workforce that delivers high
quality services
Best Value Thematic Approach
We have been supporting our annual Best Value
Thematic Approach Audit.  This is a new approach to
auditing Best Value and replaces the five yearly Best
Value Assurance Audit.  This thematic approach
focusses on a specific area each year in addition to our
standard annual audit by our external auditors, Audit
Scotland, on behalf of the Accounts Commission. 
2022/23 is being audited on the theme ‘Leadership of
the development of new local strategic priorities’ and
is looking at the development of our new Council Plan
2023-28 following the Local Government elections in
May 2022.  A report on findings is expected in
November 2023.
Education Scotland Inspection
Ardeer Primary and Early Years Establishment
received a positive report with ‘effective teamwork’ in
place to support staff and children at the
establishment praised.  The inspection was carried out
278

Page 279

Page 14 of 22 
by Education Scotland in December 2022 and found
many strengths within the school and early years
classes in their approach to raising attainment.  It was
noted that Pupil Equity Funding (PEF) was effectively
utilised to support pupils at all levels across the school
allowing gaps in learning to reduce and progress to be
made on prior levels of attainment.  The inspection
report can be read here.  
Modern Apprenticeship Programme
Our Council has been delivering its Modern
Apprenticeship Programme, one of the largest local
authority modern apprenticeship programmes in
Scotland, for 12 years.  The programme has
undergone a review to determine its future scale and
funding.  The review has provided an opportunity to
consider a wider range of apprenticeships such as
Foundation Apprenticeships, Modern Apprenticeships
and Graduate Apprenticeships all supporting
vocational based learning (Scottish Vocational
Qualifications up to SCQF Level 9) with the framework
being used to develop the existing workforce. Updates
to the programme will be implemented from April
2023.  
Our ambition is to continue to provide and recruit 50
apprenticeships each year which comprises of new
and existing employees, with 20% of places on the
Modern Apprenticeship Programme ringfenced for
residents with a disability or who are care-
experienced.  The programme is developed in
conjunction with Ayrshire College.   
For existing employees, Graduate Apprenticeships will
support workforce development in partnership with
the University of the West of Scotland as a pilot and
will focus on the qualifications of BA (Hons) Business
Management, BEng (Hons) Civil Engineering, BA Early
Learning & Childcare, BEng (Hons) Engineering Design
& Manufacture, BSc (Hons) IT: Software Development. 
Foundation Apprenticeships will be developed
alongside Education, Ayrshire College and local
businesses.  
Equality and Inclusion
In March 2023, we completed our Equality
Mainstreaming Report 2020-22 and Outcomes 2021-
25 Mid-Term Report which was approved by Cabinet
in May 2023.  Local Authorities are required to
produce equality information once every two years
under the Equality Act 2010.  A selection of the key
highlights for 2020-22 are:
♦ British Sign Language video landing page on our
Council’s website.
♦ The creation of a Black and Minority Ethnic
(BAME) pan-Ayrshire Employee Forum.
♦ New guidance on Menopause in the Workplace.
♦ Introduction of an online Equality and Children’s
Rights Impact Assessment training module.
279

Page 280

Page 15 of 22 
♦ Our overall mean Gender Pay Gap has reduced to
0.22% (1.19% in 2021).
♦ Connected Communities successful achievement
of the Silver LGBT Charter Mark.
Pregnancy Loss
To provide an environment where colleagues can
discuss and be supported with pregnancy loss, we
signed up to the Pregnancy Loss Pledge and
introduced our new Pregnancy Loss guidance in
October.  This guide will help our managers provide
practical and emotional support to all our employees
affected by all forms of pregnancy loss.
Gambling Charter
Our Council has signed up to the Gambling Charter so
that it can best support and help our workforce to
manage issues caused by gambling.  The Gambling
Workplace Charter was developed by Trade Unions as
a way of helping support those facing difficulties
caused by gambling.  Our Council already provides
employees with a variety of health and wellbeing
support through its LiveWell programme and this will
add another element of support to those struggling
and who may have found it difficult to reach out for
help with gambling.   
Our Gambling Related Harms in the Workplace Guide
provides information on support available, including,
but not limited to, our ‘Wellbeing Warriors’ who are
available to talk things through with employees and
the Money Matters team who can provide financial
advice.
Recruit with Conviction
Our Council has received Recruit with Conviction
Ambassador status.  In association with ‘Recruit with
Conviction’, the Ambassador status acknowledges our
efforts to provide safe and sustainable employment
for those with current or historical criminal
convictions.  It ensures our applicable policies and
procedures are current and proportionate and do not
exclude the best candidates from gaining employment
with us. 
A powerful and respected voice 
Carers
Our Council has been recognised by Carers Scotland as
a Carer Positive ‘Exemplary’ employer in Scotland. The
award demonstrates the support our Council provides
for its employees who are working carers, through a
combination of practical support and policy,
awareness raising, training and an active Carers
Network. 
The ‘Exemplary’ Level Three Award is the highest
accolade given to organisations who go above and
beyond in their caring commitments to colleagues and
who demonstrate innovative and creative approaches
to supporting and involving carers across their
organisation. 
The Carer Positive initiative fits with aspirations to
promote fairer working practices and is highlighted as
an example of best practice. It enables the Council to
self-assess working practices against the principles
and criteria of creating a healthy and safe
environment, where an individual’s wellbeing is
actively supported, enabling a good work-life balance
as well as creating a more diverse and inclusive
workforce.
280

Page 281

Page 16 of 22 
Performance Summary 
Where performance indicator information is pending, the most recent status up to
2021/22 year end is used.  Indicators and actions adrift of target and not previously
reported are detailed on the next page. 
Aspiring Communities
♦ Active and strong communities 
♦ Children and young people
experience the best start in life 
♦ Inclusive, growing and
enterprising local economy 
♦ Residents and communities
enjoy good life-long health and
well-being 
♦ Residents and communities are
safe 
Inspiring Place
♦ Well connected with effective
infrastructure
♦ Homes that meet residents’ needs
♦ A vibrant, welcoming and attractive
environment
♦ A sustainable environment 
A Council for the Future
♦ An accessible Council that puts
residents and communities at
the heart of what we do
♦ An efficient Council that
maximises resources and
provides value for money
♦ A valued workforce that delivers
high quality services
♦ A powerful and respected voice
Legend 
On Target / Complete
Slightly Adrift of Target
Significantly Adrift of Target
Status Unknown / Data Only
1
33%
2
67%
Performance Indicators
5
100%
Actions
15
83%
1
6%
2
11%
Actions
13
76%
1
6%
3
18%
Performance Indicators
13
81%
3
19%
Actions
3
23%
7
54%
3
23%
Performance Indicators
281

Page 282

Page 17 of 22 
Performance Indicators Adrift of Target
This section details the performance indicators adrift of target and the action being taken to address performance. 
Due to expected data lags the most recent data may relate to previous time periods but may only now be available
to report.  To avoid duplication, only data that has not previously been reported to Cabinet is included in this
section.  
Significantly Adrift of Target - CP_03 % of residents who agree they have access to opportunities to participate in
their local community.
The percentage of residents who agree they have access to opportunities to participate in their community from the
2022/23 People’s Panel survey is 36%.  This is below the target of 47%.  It should be noted that the People’s Panel is
used to collect data around a small representative group of resident’s opinions and experiences. However, from
supplementary data we know that in the final quarter of 2022/23 5,169 adults engaged in Community Learning and
Development activity with locality and thematic teams.  Activities delivered and supported includes Men's Shed,
adult literacy/numeracy/employability support, recovery/addiction groups, café solace, environmental groups,
mental health and wellbeing groups, fairer food groups, New Scots community hubs, community-based organisation
boards/committees, ESOL delivery, Community Councils, Community Associations, groups to support the voice of
older people and Gaelic. In addition, there has been a wide variety of group work activity with 2,628 young people
participating in activities including youth council, transition work, junior youth groups, Arran Outdoor group work
and work around mental health and wellbeing. The Council and partners, including the Third Sector Interface,
continue to ensure engagement with and support for residents and communities to become involved in local
activities. 
Significantly Adrift of Target - CP_25 % of Council dwellings that meet the Scottish Housing Quality Standard
(LGBF)
The change in regulations which reduced the testing period for electrical testing from every 10 years to every five
years has impacted on the reportable Scottish Housing Quality Standard (SHQS) figures.  Prior to this change we
were reporting an SHQS figure of 97.4% in reporting year 2020/21.   This dropped to 49.3% in 2021/22 due to the
number of properties which immediately fell outside the five-year testing period as a result of the reduced targets
when introduced.  An action plan has been developed and we have implemented several measures to meet the new
targets to ensure we progress towards 100% compliance in this area. 
Significantly Adrift of Target - CP_26 Tourism Visitor Numbers
A regional approach to the Tourism/Visitor Economy has recently been agreed at the Ayrshire Regional Economic
Joint Committee, which together with the established North Ayrshire Local Tourism Forum, will work towards
improving tourism visitor numbers as we continue to recover from the impacts of the pandemic. 
Significantly Adrift of Target - CP_27 Street Cleanliness Index - % Clean (LGBF) 
The Street Cleaning Index score decreased from 2021/22 to 2022/23 (86.7% to 84.6%). Changing demands  on the
service continue to be reflected in adjusted operational arrangements to improve street cleanliness scores.  (Note: 
Previous figure of 89.5% for 2021/22 was a provisional figure based on an audit in late October 2021.  The revised
2021/22 figure of 86.7% is from the most recent Local Government Benchmarking Framework (LGBF) data release. 
However, most recently our Street Cleanliness index is 84.6% as at 2022/23.)
Slightly Adrift of Target - CP_19 Proportion of operational buildings that are suitable for their current use (LGBF)
Projects which will contribute to improving our performance in this area are underway, including the replacement
Moorpark Primary School and forthcoming Ardrossan Community Campus. In addition, rationalisation opportunities
continue to be explored, and it is anticipated that there will be further improvement in the performance of the
operational building estate ahead of the next reporting period. 
282

Page 283

Page 18 of 22 
Slightly Adrift of Target - CP_20 Overall percentage of road network that should be considered for maintenance
treatment
There has been a marginal deterioration in overall road condition with an increase of 0.9% in the percentage of the
road network that should be considered for maintenance treatment.  This is reflective of inflationary pressures
impacting on material and contractor costs. The continued road investment programme is developed to optimise
investment and prioritise works across the network to maintain current road condition.   The approved additional
investment in 2022/23 and 2023/24 will assist in improving the road network performance indicator. 
Slightly Adrift of Target - CP_21 Proportion of properties receiving superfast broadband (LGBF)
LGBF data confirms 94.9% of properties in North Ayrshire are receiving superfast broadband.  This is an increase
from 94.7% in 2020/21.  Though we monitor this indicator, we do not have direct influence over the rollout of
broadband as this sits with the national R100 programme. 
Slightly Adrift of Target - CP_22 Number of electric vehicle charging points publicly available.
This indicator is only one EV charge point from reaching the target (59 against a target of 60) due to elongated 
community engagement to agree an appropriate location. 
The number of publicly available EV charge points within North Ayrshire is 59 (35 owned by our Council and 24
privately owned).  The following new charge points were added: 
• 1 x 50kW at Skelmorlie Community Centre
• 1 x 7Kw at Lockhart ASN Campus, Stevenston
• 1 x 50kW at Clockhouse Car Park, Lamlash
• 2 x 7Kw at Arran Outdoor Education Centre, Lamlash 
Slightly Adrift of Target - CP_23 Number of new build Council housing units reaching completion (cumulative)
The SHIP 2023 – 2028 was approved by Cabinet on 1 November 2022.  As at 31 March 2023, a total of 831 new
Council units have been completed since our development programme commenced. 
We have been monitoring the impact of COVID-19 and inflationary pressures on the SHIP, all of which have created
time and financial impacts, due to labour and material shortages and an increase in material costs.   
Slightly Adrift of Target - CP_31 % of total household waste that is recycled (calendar year as per SEPA) (LGBF)
The household waste recycling rate for the calendar year 2022 was 55.3% compared to a target of 56.9%. As people
continue to work from home, the composition and quantities of domestic waste generated continue to fluctuate.
North Ayrshire Council is one of the highest performing for recycling in Scotland and continuously strives to improve
performance in this area.  A new Zero Waste Strategy is currently being developed, which will include a wide range
of actions to assist in improving performance against this indicator.  
283

Page 284

Page 19 of 22 
Actions Adrift of Target
Within our Council Plan Delivery Plan overall actions are supported by sub actions.  Officers provide an update on
activity and an estimate of the current status (red, amber or green).  Where a sub action is adrift of target (amber or
red) this sets the status of the overall target so that any off-target performance can be highlighted, with significantly
adrift (red) statuses taking priority.  This section highlights the reasons for underperformance within each action and
efforts being made to remedy it.    An overview of action performance can be shown in appendix three of this report. 
CP_05 We will expand our learning and childcare estate, including ensuring all eligible children are able to access 1140
hours of free childcare each year 
CP-SUB-08 Deliver major educational
new build and refurbishment projects
aligned to Scotland’s Learning Estate
Strategy: "Connecting People, Places
and Learning”.
Significant challenges within the construction industry persist, including
programme and budgetary pressures arising from inflation, borrowing costs
and access to labour and materials. This has led to delays on several projects
including Ardrossan Community Campus, Moorpark Primary School and
Marress Early Years Centre. Officers continue to work to keep all stakeholders
updated timeously, mitigate delays as far as possible and complete projects in
line with revised programmes.
All children entitled to 1140 hours of free childcare continue to be successfully
placed within Council and partner provision. 
CP-SUB-09 Develop an Outdoor Play
Strategy to support Early Years
Practitioners to provide excellent
learning and developmental
opportunities.
(Complete – no remedial note required)   
CP_15 We will let people decide how best to manage their own care needs and support people to live in their own
homes for as long as possible 
CP-SUB-31 Re-design Older People's
Services - Home First approach (Complete – no remedial note required) 
CP-SUB-32 Grow Care At Home capacity (On Target – no remedial note required) 
CP-SUB-33 Prioritise Day Services Model
and Support for Carers. (On Target – no remedial note required) 
CP-SUB-34 Prioritise integrated Island
services, including unscheduled care. (On Target – no remedial note required) 
CP-SUB-35 We will help individuals to
have better choice and control of their
support at an early stage by
reinvigorating the HSCP charging policy.
(Complete – no remedial note required) 
CP-SUB-35a We will help individuals to
have better choice and control of their
support at an early stage by
reinvigorating Self-Directed Support.
Phase one of the Self-Directed Support (SDS) Review is complete.  A set of
collective recommendations and actions have been agreed at the final SDS
Learning review Board. Proposals and recommendations have been grouped
under nine themes, a number of actions are in progress as a result and
further engagement is being undertaken with the Partnership Senior
Management Team to consider the priority actions to be taken forward and
resourced into Phase Two.   
284

Page 285

Page 20 of 22 
CP_16 We will work with individuals and communities to support positive lifestyle choices which improve health and
wellbeing. 
CP-SUB-36 We will provide
opportunities for people to be more
active more often, through the Active
Communities Strategy
(Complete – no remedial note required) 
CP-SUB-37 We will work with Scottish
Government as a trailblazer site for the
whole systems approach to diet and
healthy weight (public health priority)
(Complete – no remedial note required) 
CP-SUB-38 Prioritisation of children and
young people receiving support from
Child and Adolescent Mental Health
Services.
(On Target – no remedial note required) 
CP-SUB-39 Prioritise community mental
health services supporting people within
their communities.
(On Target – no remedial note required) 
CP-SUB-40 We will place Mental Health
Practitioners into GP practices to offer
triage calls, urgent and routine face to
face assessments as well as directing
patients to the most appropriate
support without unnecessary referrals
to mental health services.
A Mental Health and Wellbeing in Primary Care Business Case has been
developed.  We cannot progress further until anticipated Scottish
Government funding is allocated.   The service is recognising that funding
may be unlikely to come in the near future and planning for such will need to
be considered.   
CP-SUB-41 We will improve emotional
and mental health and wellbeing
through physical and social
participation in community activities,
including for young people
(Complete – no remedial note required)   
CP_19 We will provide well-maintained, integrated travel and transport networks, supporting alternative and
sustainable transport. 
CP-SUB-50 We will support the
development of the Ayrshire Regional
Transport Appraisal.
Transport Scotland (TS) previously confirmed that the Regional Transport
Appraisal (RTA) would be part of the Strategic Transport Projects Review 2
(STPR2) process.  At this stage, there remains no clarity on the approach to
regionally significant projects. Our response on STPR2 was prepared and
submitted to Transport Scotland in April 2022 which reinforced the points
raised previously, in particular, the Council’s disappointment in the lack of
any North Ayrshire specific interventions and the lack of clarity on the RTA
approach.   
285

Page 286

Page 21 of 22 
CP_26 We will actively promote a mix of homes by facilitating private housing development. 
CP-SUB-67 We will deliver an alternative
affordable housing model – HOME – in
one of our most pressured localities
The financial viability of the HOME model continues to be assessed during
the currently volatile house construction market. A report will be presented
to Cabinet to consider the current position.     
CP_29 We will provide well-kept public places and town centres which will benefit our residents, visitors and businesses. 
CP-SUB-69 We will seek opportunities to
develop affordable housing in our town
centres through our Strategic Housing
Investment Plan
(On target – no remedial note required) 
CP-SUB-70 We will deliver the actions
arising from the Open Space Strategy
and the Litter, Fly Tipping and Dog
Fouling Prevention Strategy.
(On target – no remedial note required) 
CP-SUB-71 We will develop
Decriminalised Parking Enforcement to
manage town centre traffic.
The final Decriminalised Parking Enforcement (DPE) application was
submitted to Scottish Government in line with the formal statutory process
with an anticipated outcome expected to allow the transfer of powers to
North Ayrshire Council in November 2023.   
286

Page 287

Page 22 of 22 
Trend Charts 
Key: 
0
100,000
200,000
300,000
400,000
500,000
2018/19 2019/20 2020/21 2021/22 2022/23
CP_15 Number of attendances at
indoor sports & leisure facilities
(Excluding Pools)
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2018/19 2019/20 2020/21 2021/22 2022/23
CP_29 Overall Carbon Emissions
(Tonnes)
0%
1%
2%
3%
4%
5%
2019/20 2020/21 2021/22 2022/23
CP_02 % of Council budget directed
via participatory methods
0
10
20
30
40
50
60
70
2019/20 2020/21 2021/22 2022/23
CP_22 Number of electric vehicle
charging points publicly available
0%
10%
20%
30%
40%
50%
60%
70%
2018/19 2019/20 2020/21 2021/22 2022/23
CP_31 % of total household waste
that is recycled (Calendar Year as
per SEPA) (LGBF)
0%
10%
20%
30%
40%
50%
60%
70%
2018/19 2019/20 2020/21 2021/22 2022/23
CP_33 % of Self Service
Transactions
287

Page 288

For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000 
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
288

Page 289

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 1 of 6 
Appendix 2 – Council Plan Performance Indicators 
Priority - Aspiring Communities
PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_02 Percentage of
Council budget directed via
participatory methods
1.11% 0.89%  1.13% 1.2%  2.32% 1.1%  2.74% 1% 
CP_03 Percentage of
residents who agree they
have access to opportunities
to participate in their local
community
47% 47%  47% 47%   47%  36% 47% 
CP_04 Percentage of
children achieving their
developmental milestones at
the time the child starts
primary school
N/A 79%  72% 80%  78.5% 78% 
Data
available
in July
2024  
PI Status 
Significantly Adrift of Target 
Slightly Adrift of Target 
On Target 
Data Only 
Data Not Available
289

Page 290

PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_05 Average total tariff
score of pupils living in SIMD
30% most deprived areas
685.8 718  744.7 724  720 710 
Data
available
in Feb
2024
TBC 
CP_06 Average tariff score:
All Leavers 857.4 895  912 900  905.6 880 
Data
available
in Feb
2024
TBC 
CP_07 Percentage of school
leavers entering positive
destinations (LGBF)
92.5% 96%  95.2% 96.2%  96% 93.5% 
Data
available
in Feb
2024
TBC 
CP_08 Percentage of
children living in poverty
(after housing costs)
27.9% 26.5%  24.7%* 26.5%  29%  
Data
available
June
2024  
CP_09 Percentage of
working age population in
employment
70.2% 70%  69% 64.7%  66.3% 70%  71.3% 68% 
CP_10a Percentage of
procurement spent on local
enterprises
19.98% 23%  21.39% 23.5%  22.93% 24%  26.04% 25% 
290

Page 291

PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_11 Percentage of people
earning less than the living
wage (LGBF)
16% 24%  16.2% 23%  11.7% 22% 
Data
available
in Feb
2024
TBC 
CP_12a Cumulative Number
of unemployed disabled
residents supported
109 100  114 80  135 120  135 120 
CP_12b Cumulative number
of unemployed disabled
residents supported into
employment
18 20  18 16  34 20  36 20 
CP_14 Percentage of
households in fuel poverty 28% 25.5%  28% 28% 
Data
available
2024
28% 
Data
available
2025
TBC 
CP_15 Number of
attendances at indoor sports
& leisure facilities (excluding
pools)
1,859,843 1,964,100  71,913 736,915  298,806   445,115  
CP_16 Percentage of people
aged 65 and over with long-
term care needs who
receiving personal care at
home (LGBF)
69.42% 66%  69.51% 66%  69.6% 66% 
Data
available
in May
2024
TBC 
291

Page 292

PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_17 Emergency
Admissions (Number) 19,150 20,257  16,283 20,257  17,966 20,257  17,273 20,000 
CP_18 Percentage of new
tenancies to applicants who
were assessed as homeless
sustained for more than a
year
84.07% 82%  92.48% 85%  86.92% 85%  88.38% 86% 
292

Page 293

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 5 of 7  
Priority - Inspiring Place 
Code & Short Name
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_19 Proportion of operational
buildings that are suitable for their
current use (LGBF)
90.89% 93%  91.05% 93%  91.1% 93% 
Data
available
in May
2024
TBC 
CP_20 Overall percentage of road
network that should be considered
for maintenance treatment
37.3% 38.1%  37.1% 38.1%  33.9% 37.5%  34.8% 33.8% 
CP_21 Proportion of properties
receiving superfast broadband
(LGBF)
94.1% 97%  94.7% 97%  94.9% 97% 
Data
available
in May
2024
100% 
CP_22 Number of electric vehicle
charging points publicly available 36 30  45 42  49 43 
59 (As at
Q3
(calendar
year))
60 (As at
Q3
(calendar
year)) 
CP_23 Number of new build
Council housing units reaching
completion (cumulative)
381 351  437 755  681 630  831 866 
CP_24 Number of empty homes
brought back into use (cumulative)* 603 500  724 600  1,058 600  1,181 600 
293

Page 294

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 6 of 7  
*CP_24 Number of empty properties brought back into use (cumulative) – An error was found in the 2019-2023 calculations for this PI.  This has been rectified as at
September 2023.  This has resulted in an increase in the number of empty properties recorded within this measure and a change in status for previous years to on
target (green).
Code & Short Name
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_25 Percentage of Council
dwellings that meet the Scottish
Housing Quality Standard (LGBF)
99.36% 99.4%  98.83% 99.5%  49.3% 99.5% 
Data
available
in May
2024
TBC 
CP_26 Tourism Visitor Numbers 1,599,40
0
1,534,96
8 315,620 1,534,96
8 858,300 1,534,96
8 
1,403,0
20
1,600,0
00 
CP_27 Street Cleanliness Index - 
Percentage Clean (LGBF) 94.6% 94%  91.34% 94%  86.7% 94%  84.6% 90% 
CP_28 Hectares of vacant &
derelict land in North Ayrshire 1,180 1,244  1,204 1,194  1,198 1,144  Data
pending 1,094 
CP_29 Overall carbon emissions
(tonnes)*** 37,508 39,320  22,846 35,127  21,791 21,247  20,896 21,000 
CP_30 Total installed capacity of
low carbon heat and electricity
generation across the Council's
estate
9,700 9,700  10,720 9,800  11,680 11,000  Data
pending 11,800 
CP_31 Percentage of total
household waste that is recycled
(calendar year as per SEPA)
(LGBF)
56.3% 59%  52.1% 52.1%  56.3% 53.1%  55.3% 56.9% 
294

Page 295

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 7 of 7  
Priority - A Council for the Future 
Code & Short Name
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_32 Percentage of Customers
delighted with the overall Customer
Service
81% 77%  Surveys suspended due to COVID-19 and due to resume in 2023/24.
CP_33 % of Self Service Transactions 41.26% 40%  58% 45%  58.33% 50%  60.07% 50% 
CP_34 Employee Engagement Level -
Council Wide 70.67% 70%  No Survey Planned 
295

Page 296

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 1 of 6   
Appendix 3 - Council Plan Action Tracker 
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Aspiring Communities 
What we’
ll do to make active and strong
communities
CP_01 We will build stronger relationships between the council,
communities and partners.             
CP_02
We will co-produce a local charter with our communities
which sets out the things we jointly commit to do for each
other, to help each other create a better North Ayrshire.         
Complete 
CP_03
We will extend our participatory approach, offering
communities more opportunities to lead in local decision-
making.             
Complete 
CP_04 We will support communities to achieve what’s important to
them through strong local networks.             
What we’
ll do to
ensure our children
and young people    CP_05
We will expand our early learning and childcare provision to
make sure all eligible children are able to access 1140 hours of
free care each year.                
CP_06
We will support our children and young people to become
successful learners, confident individuals, effective
contributors and responsible citizens.                
296

Page 297

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 2 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP_07
We will offer opportunities to our young people and their
families to play a more active role in school life and encourage
more participation in learning opportunities.                
CP_08
We will work with all young people to build their resilience,
supporting their mental health and physical wellbeing.       
What we’
ll do to have an inclusive, growing
and enterprising local economy
CP_09
We will work with schools, colleges, universities, businesses
and partners to deliver education, skills and training, helping
people into work and sustaining employment.                
CP_10 We will make sure that everyone has the ability and
knowledge to participate in the digital world.                
CP_11 We will support our local businesses to become more
innovative and competitive.                
CP_12 We will promote fair employment practices.                
CP_13 We will develop and implement a Community Wealth Building
(CWB) strategy.                
What we’
ll do
to make sure
North Ayrshire    CP_14
We will continue our work with partners, including the
Scottish Government, to explore the feasibility of a Scottish
Basic Income Pilot.     
Complete
CP_15
We will let people decide how best to manage their own care
needs and support people to live in their own homes for as
long as possible.                
297

Page 298

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 3 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP_16 We will work with individuals and communities to support
positive lifestyle choices which improve health and wellbeing.                
What we will do
to ensure North
Ayrshire    CP_17 We will work with partners to support our vulnerable
residents and communities.                
CP_18 We will extend the ‘Housing First’ pilot to address
homelessness.                
Inspiring Place
What we’
ll do to make North Ayrshire well-connected with
effective infrastructure
CP_19
We will provide well-maintained, integrated travel and
transport networks, supporting alternative and sustainable
transport.                
CP_20
We will work with partners to make sure there is sustained
investment in our roads, ports and harbour infrastructure to
ensure that travel is resilient and reliable.             
Complete 
CP_21 We will work with partners to extend public wi-fi and improve
our digital connectivity.                 
CP_22
We will provide an appropriately sized, fit for purpose,
energy-efficient and digital- enabled property portfolio,
including our schools.                
CP_23
We will attract investment, through the Ayrshire Growth Deal
and other means, to support regeneration and job creation at
our key development sites of i3 Irvine, Hunterston, Lochshore,
Ardrossan Marine Quarter, and the Irvine Great Harbour.                
CP_24
We will support our communities to maximise the use of
community assets (such as schools) and encourage
Community Asset Transfers.             
Complete 
298

Page 299

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 4 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
What we’
ll do to provide our
residents with homes and houses that
meet their needs
CP_25
With our social landlord partners, we will build new, modern,
energy-efficient lifelong homes for life, tailored to the needs
of tenants.             
Complete 
CP_26 We will actively promote a mix of homes by facilitating private
housing development.                
CP_27
We will work with property owners and landlords to make
sure our private housing is suitable for the needs of our
residents.             
Complete 
CP_28 We will form a partnership with other Councils to introduce a
low-cost energy offer.    
Off
Programme
No longer being pursued following a decision by Nottingham City
Council to sell their not-for-profit energy company to British Gas
following significant financial losses.
What we’
ll do to make North Ayrshire a
vibrant, welcoming and attractive environment
CP_29 We will provide well-kept public places and town centres
which will benefit our residents, visitors and businesses.                
CP_30 We will, where possible, bring empty properties back into use.                
CP_31 We will work with communities to improve the quality of the
local environment through a participatory approach.              Complete 
CP_32 We will develop North Ayrshire as a coastal and island
destination, attracting tourism investment and visitors.                
299

Page 300

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 5 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
What we'll do to make sure we all live in a
sustainable environment
CP_33 We will support a circular economy by re-using, recycling and
generating energy from the waste we manage.            Complete 
CP_34 We will develop additional low carbon renewable energy
schemes and networks.                
CP_35
We will protect our communities by delivering the Local Flood
Risk Management Plan, the Shoreline Management Plan and
the Millport and Upper Garnock Valley Flood Protection
Schemes.                
A Council for the Future
An accessible Council that puts
residents and communities at
the heart of what we do CP_36
We will work with communities and key stakeholders to
radically review what we do and how we do it, to deliver cost
effective services.                
CP_37 We will provide joined up services across the Council and with
partner agencies and communities.                
CP_38 We will use technology to improve access to and delivery of
our services.                
300

Page 301

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 6 of 6
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
A powerful and
respected voice
CP_39 We will make our case nationally, regionally and locally levels
to secure investment to support delivery of our priorities. Complete
An efficient Council that
maximises resources and
provides value for money
CP_40 We will review what we do and how we do it to ensure we
deliver the best possible services.
This action was removed as approved by Cabinet in August 2021 as
it duplicates CP_36 and CP_37.
A valued workforce
that delivers high
quality services
CP_41 We will empower and invest in our workforce to develop new
and innovative ways of working.
301

Page 302

North Ayrshire Council
Annual Performance Report 2022-23
Appendix 4
302

Page 303

Welcome to our Annual Performance Report 2022-23
This report provides an at a glance summary of how we’ve supported
our residents of North Ayrshire over the past year. You can find full
details in our magazine style Council Plan Progress Reports published
on our website (https://www.north-ayrshire.gov.uk/performance).
In June 2023, our new Council Plan 2023-28 was approved by
Council.  As a result, this Annual Performance Report is the final
annual report relating to our 2019-24 plan and our vision remains to
achieve a North Ayrshire that is fair for all.
We are proud to serve our people of North Ayrshire and would like
to say thank you to everyone who has supported the delivery of our
services including our communities, Third Sector, public and private
partnerships and of course our employees. 
Councillor Marie Burns
Leader of the Council
Craig Hatton
Chief Executive
303

Page 304

About Us 
Elected Members 
• 12 Scottish National Party (SNP) 
• 10 Scottish Conservative and Unionist 
• 6 Scottish Labour Party
• 3 Labour and Co-Operative Party
• 2 Independent 
Employees 
• 6,249.29 Full Time Equivalent employees
• 72% Female 
• 28% Male 
Key Facts
• 134,220
• Life Expectancy:
o Female:  79.7 years
o Male:  74.4 years
• 19,669 children and young people attend our
schools and early years centres (including
partner early years centres)
• 22.7% of children are looked after by our
Council (14% at Scotland level) 
• 29% of children in North Ayrshire live in
poverty (after housing costs)
• 28% of households are in fuel poverty
• 71.2% of residents are in employment
• 40.9% of our residents live in the most
deprived Scottish Index of Multiple
Deprivation areas
Key assets include: 
• 42 Local Authority Early Years Provisions
• 14 Partner Early Years Provisions
• 48 Primary Schools
• 8 Secondary Schools
• 1 Additional Support Needs School 
• 1 Through School (Early Learning Centre,
Primary & Secondary School combined) 
• 13,135 Council Homes
• 1,044km carriageway 
• 1,020km footpaths
• 23,735 streetlights
• 16 beaches (including 3 Sites of Special
Scientific Interest (SSSI))
• 275 Hectares of woodland
• 11,680kW Total installed capacity of low
carbon heat and electricity generation across
our Council’s estate 
304

Page 305

Financial Overview 
Scottish
Government
General Grant,
£290.711, 71%
Scottish
Government
Specific Grant,
£20.742, 5%
Non Domestic
Rates, £37.497,
9%
Council Tax,
£61.989, 15%
Funding (£000's)
Chief
Executive's,
£26.378 , 6%
Communities &
Education,
£170.353 , 42%
Place, £55.157 ,
13%
Health and
Social Care
Partnership,
£120.549 , 29%
Other Corporate
Items, £10.837 ,
3%
Financing Costs,
£27.665 , 7%
Allocation (£000's)
305

Page 306

Our Council Plan
Our Council Plan is our commitment to our communities.  It underpins everything we do for our
people in North Ayrshire.
The Council Plan 2019-24 has three priorities: ‘Aspiring Communities’, ‘Inspiring Place’ and ‘A Council
for the Future’.  
Aspiring Communities
• Our Child Poverty and Cost of Living Board was established in June 2022, with a £1.4m Early
Intervention Fund allocated to the Board in March 2023.
• We held five mini public enquiries which have informed our Child Poverty Action Plan and
Council Plan.
• Our Energy Smart Scheme was allocated £1.726m in our 2022/23 budget, with an additional
£450,000 approved in August.
• 18,962 National Entitlement Cards and Young Scot NECs have been used to date – the third
highest in Scotland.
• 128 community groups were successful in their participatory budgeting bids. Each group will
receive a share of £109,777.
• To strengthen the Community Hub model, 14 sites across North Ayrshire now have Fairer Food
community larders embedded within community facilities.
• Our first Annual Promise Conference welcomed 130 people.
• 170 people attended our Reducing the Cost of the School Day conference.
• 100 stakeholders from across Scotland attended our first Community Wealth Building
conference.
• During 2022/23, the Fair Work Ayrshire Team engaged with 236 businesses.
• 3,642 inclusive Active School sessions were delivered to 5,976 of our young people.
• Cabinet approved the allocated of £2.154m of Scottish Government Covid Recovery Fund for a
range of support to low-income households.
• A £434million Capital Investment Programme has been approved by Cabinet.
• Work on the £48million flood protection scheme for Millport has begun.
Inspiring Place
• The formal opening of our £4.2million Lochshore Hub took place in September 2022, attracting
approximately 1,000 attendees with a free family fun day.
• We held our first ever Making Waves Festival in Irvine on 23rd and 24th of July.
• We have awarded the tender to deliver two Council-owned solar farms.  The £12.8million
project will see the former landfill sites at Nethermains in Kilwinning, and Shewalton in Irvine
transformed into two solar farms.
• We have established a Community Renewable Energy Generation Funding Scheme.  The
scheme empowers communities to undertake renewable energy initiatives.
• The first year of advertising on roundabouts across North Ayrshire has been positive.  Of the 24
roundabouts locations initially granted planning consent, 23 locations were sold within one
week of release.
306

Page 307

• Secured partnership of National Manufacturing Institute Scotland and University of
Strathclyde as having a presence as lead operator of a national innovation centre for
manufacturing.
• Developed academic partnerships with University of Stirling to support our blue economy
ambitions through the International Marine Science Centre project and Hunterston.
• Our Council Strategic Housing Investment Plan (SHIP) 2023-2028 has been finalised which
supports the Scottish Government’s Affordable Housing Supply Programme (AHSP). A total of
831 new Council units have been completed since our development programme commenced.
• Renovation works to improve and restore the 144-year-old Millport Town Hall building have
begun.
A Council for the Future
• We successfully delivered the Local Government Elections on Thursday 5 May 2022 with a
turnout of 44%
• 1,400 people completed the 2023/24 Budget and Council Plan Engagement Survey, in addition
to 37 community representatives across six locality events.
• Our procurement process has been revised to ensure more local businesses are able to quote
for lower value goods and services through the Quick Quote process.
• We have received Recruit with Conviction Ambassador status.
• We jointly held the first ever Hate Crime Conference in Ayrshire, which was delivered by the
Ayrshire Equality Partnership (AEP)
• We achieved the Disability Confident: Level Three Leader Award.
• We committed to the Miscarriage Association’s Pregnancy Loss Pledge.
• We have signed up to the Gambling Charter so that we can best support and help our workforce
to manage issues caused by gambling.
How do we compare?
You can see how our performance compares to other Scottish local
authorities through the national Local Government Benchmarking
Framework online tool.   
The Corporate Policy, Performance and Elections Team welcome any feedback you may have.  We strive to make
our Council and reports as accessible as possible and appreciate opportunities to discuss how this can be achieved. 
For further information please contact: 
The Corporate Policy, Performance and Elections Team
Tel: 01294 310000
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
307

Page 308

Local Government Benchmarking Framework
Analysis of 2023 Data Release
(Includes 2021-22 and specific data for 2022-23)
September 2023
Appendix 5
308

Page 309

Local Government Benchmarking Framework – September 2023 Analysis Page 1 of 24
Contents
Introduc�on ............................................................................................................................................ 2
Our Approach .......................................................................................................................................... 3
Analysis ................................................................................................................................................... 5
People Services ................................................................................................................................... 5
Propor�on of children living in poverty (a�er housing costs) ........................................................ 6
Gross rent arrears (all tenants) as a percentage of rent due for the year ...................................... 7
Propor�on of children mee�ng developmental milestones ........................................................... 7
Propor�on of pupils entering posi�ve des�na�ons........................................................................ 8
Propor�on of council dwellings mee�ng the Sco�sh Housing Quality Standards ......................... 8
Propor�on of council dwellings that are energy efficient ............................................................... 9
Percentage of people aged 65 years and over with long-term health needs who are receiving
personal care at home .................................................................................................................. 10
Other Services ................................................................................................................................... 10
CO2 emissions area wide per capita (tonnes) ............................................................................... 11
CO2 emissions area wide: emissions within scope of local authority per capita (tonnes) ........... 11
Claimant count as a percentage of working age popula�on ........................................................ 12
Claimant count as a percentage of popula�on aged 16 to 24 years ............................................. 12
Propor�on of people earning less than the living wage ............................................................... 13
Percentage of unemployed people assisted into work from Council programmes ...................... 13
Gross Value Added (GVA) per capita ............................................................................................. 14
Immediately available employment land as a percentage of total land allocated for employment
purposes ........................................................................................................................................ 15
Propor�on of procurement spent on local enterprises ................................................................ 16
Number of business gateway start-ups per 10,000 popula�on .................................................... 17
Town Vacancy Rates ...................................................................................................................... 18
Propor�on of proper�es receiving Superfast Broadband ............................................................. 18
Street Cleanliness Score ................................................................................................................ 19
Propor�on of total household waste arising that is recycled ....................................................... 19
Propor�on of the highest paid 5% of employees who are women .............................................. 21
Gender pay gap ............................................................................................................................. 21
Percentage of income due from Council Tax recevied by the end of the year ............................. 22
Percentage of invoices sampled that were paid within 30 days ................................................... 22
Percentage of Sco�sh Welfare Fund Crisis Grant decisions made within one day ...................... 23
Percentage of Sco�sh Welfare Fund Community Care Grant decisions made within 15 days .... 24
Percentage of opera�onal buildings suitable for their current use .............................................. 24
309

Page 310

Local Government Benchmarking Framework – September 2023 Analysis Page 2 of 24
Introduc�on
The Local Government Benchmarking Framework (LGBF) provides an opportunity to benchmark our
performance with other local authori�es in Scotland.  It is administered by the Improvement Service
in partnership with the Society of Local Authority Chief Execu�ves (SOLACE) and highlighted within
the Accounts Commission’s Statutory Performance Informa�on Direc�on 2021 which defines how
local authori�es should demonstrate they are achieving Best Value for the people they serve.  As a
result, many of the indicators are used within both our previous 2019-24 and current 2023-28
Council Plans. 
The 2021-22 data is s�ll caveated due to the impact of the pandemic.  The Improvement Service
states: “This dataset covers the 2nd year of the Covid pandemic. The Impact of Covid has altered the
core opera�ng and delivery landscapes for local authori�es, and the performance and expenditure
data within the LGBF will need to be interpreted against this context. This will be important to
consider both for comparison with previous years, and also comparison across councils.” 
The impact of the pandemic can certainly be seen in the trend charts contained in this report.  As a
result, though this report details our performance as at 2021-22 compared with similar local
authori�es, it is s�ll rela�vely light touch with improvements planned for future repor�ng.
The LGBF brings together a range of 105 performance indicators covering nine key themes:
• Adult Social Care
• Children’s Services
• Corporate Services
• Culture and Leisure
• Economic Development
• Environmental Services
• Financial Sustainability
• Housing
• Tackling Climate Change
These can be explored in full using the LGBF Dashboard.
310

Page 311

Local Government Benchmarking Framework – September 2023 Analysis Page 3 of 24
Our Approach
The Direc�on 2021 Statutory Performance Indicator 1 includes a requirement for our Council to
report informa�on that demonstrates how we are improving local services and local outcomes.  This
par�cularly relates to using the LGBF to enable comparison with similar bodies and over �me, linked
to the desired outcomes agreed with our partners and communi�es.  As such, the Direc�on 2021
gives scope to iden�fy the key LGBF measures that relate directly to our Council Plan priori�es to
help inform decision making.  South Lanarkshire Council took this approach and was highlighted by
the Accounts Commission in the Local Government in Scotland Overview 2023.  
The following PIs have been iden�fied by the Corporate Policy, Performance and Elec�ons Team as
rela�ng directly to our current Council Plan 2023-28 priori�es.  These are listed in addi�on to those
directly included our Council Plan Performance Management Framework and our Council Plan 2019-
24, which was ac�ve during this 2021-22 repor�ng period.  
LGBF
Indicator
Group
PI Code Description
Council
Plan 
2019-23
Framework
Council
Plan 
2023-28
Framework
Children’s
Services CHN11 Percentage of pupils entering positive destinations Yes Yes
Children’s
Services CHN17 Percentage of children meeting developmental
milestones  Yes
Children’s
Services CHN24 Percentage of children living in poverty (after
housing costs)  Yes
Adult Social
Care* SW3a
Percentage of people aged 65 years or over with
long-term care needs receiving personal care at
home
Yes 
Tackling
Climate
Change
CLIM1 CO2 emissions area wide per capita  Yes
Tackling
Climate
Change
CLIM2 CO2 emissions area wide: emissions within scope of
LA per capita  
Economic
Development ECON1
Percentage of unemployed people assisted into
work from council operated / funded employability
programmes  
Economic
Development ECON10
Immediately available employment land as a
percentage of total land allocated for employment
purposes in the local development plan  
Economic
Development ECON11 Gross Value Added (GVA) per capita  
Economic
Development ECON12a Claimant Count as a percentage of Working Age
Population  
Economic
Development ECON12b Claimant Count as a percentage of population aged
between 16 and 24 years  
Economic
Development ECON4 Percentage of procurement spend spent on local
enterprises  
Economic
Development ECON5 Number of business gateway start-ups per 10,000
population  
311

Page 312

Local Government Benchmarking Framework – September 2023 Analysis Page 4 of 24
LGBF
Indicator
Group
PI Code Description
Council
Plan 
2019-23
Framework
Council
Plan 
2023-28
Framework
Economic
Development ECON7 Proportion of people earning less than the real
living wage Yes Yes
Economic
Development ECON9 Town Vacancy Rates  
Environmental
Services ENV3c Street Cleanliness Score Yes Yes
Environmental
Services ENV4b Percentage of A class roads that should be
considered for maintenance treatment  
Environmental
Services ENV4c Percentage of B class roads that should be
considered for maintenance treatment  
Environmental
Services ENV4d Percentage of C class roads that should be
considered for maintenance treatment  
Environmental
Services ENV4e Percentage of unclassified roads that should be
considered for maintenance treatment  
Environmental
Services ENV6 Percentage of total household waste arising that is
recycled Yes Yes
Housing
Services HSN1b
Gross rent arrears (all tenants) as at 31 March each
year as a percentage of rent due for the reporting
year 
Yes
Housing
Services HSN3 Percentage of council dwellings meeting Scottish
Housing Standards Yes Yes
Housing
Services HSN5a Percentage of council dwellings that are energy
efficient  Yes
Economic
Development* ECON8 Proportion of properties receiving superfast
broadband Yes 
Corporate
Services CORP 3b Percentage of the highest paid 5% of employees
who are women  
Corporate
Services CORP 3c The gender pay gap (%)  
Corporate
Services CORP 7 Percentage of income due from council tax received
by the end of the year  Yes
Corporate
Services CORP 8 Percentage of invoices sampled that were paid
within 30 days  
Corporate
Services CORP 9 Percentage of Scottish Welfare Fund Crisis Grant
decisions within one day  
Corporate
Services CORP 10 Percentage of Scottish Welfare Fund Community
Care Grant decisions in 15 days  
Corporate
Asset
CORP-
ASSET1
Percentage of operational buildings that are
suitable for their current use Yes Yes 
*Please note, the list above includes two LGBF PIs that were included in the Council Plan 2019-24
Performance Management Framework for completeness.   Adult Social Care is reported through the
Health and Social Care Partnership.  Superfast Broadband is part of the na�onal R100 programme
and we cannot directly impact on progress.   These two indicators will not be included in future
repor�ng.
312

Page 313

Local Government Benchmarking Framework – September 2023 Analysis Page 5 of 24 
Analysis
Family groups enable local authori�es to make as close to a like for like comparison as possible with
other councils by grouping those with similar traits depending on the type of indicator.  Grouping is
based on levels of depriva�on (people services) or rurality (other services).  Following a review of
previous repor�ng, a more visual chart-based approach and analysis focussing on family groups is
taken for this report.  This more in-depth considera�on of each indicator is made possible by
focussing on the indicators directly linking to our priori�es, in line with the Direc�on 2021.
On the following charts, North Ayrshire Council’s performance is indicated by a thick dark blue line. 
For ease of viewing, only the data labels rela�ng to North Ayrshire Council are included in the
graphs.  Full details, including the meta data behind each measure which explains how it is captured,
is available through the LGBF Dashboard.
The Improvement Service is currently exploring how to publish data more �meously, therefore
though this report intends to cover 2021-22 data as released during 2023, some informa�on may
relate to more recent periods.  Data is as downloaded in September 2023 unless otherwise stated. 
People Services
This sec�on provides an overview of North Ayrshire’s performance within our ‘People Services’
Family Group.  This includes our priority indicators rela�ng to Children, Social Work and Housing. 
Local authori�es included in this comparison are:
• North Ayrshire Council
• Comhairle nan Eilean Siar 
• Dundee City Council 
• East Ayrshire Council 
• North Lanarkshire Council 
• Inverclyde Council 
• West Dunbartonshire Council 
• Glasgow City Council 
313

Page 314

Local Government Benchmarking Framework – September 2023 Analysis Page 6 of 24
Propor�on of children living in poverty (a�er housing costs)
(Please note, the axis of this chart is 15- 35% for clarity.)
Despite 2020-21 figures appearing to show a decrease in child poverty, unfortunately this due to a
change in methodology during the lockdown periods as detailed in our Council Plan Mid-Year 2022-
23 report “These figures are sourced from Loughborough University and are based on the
Department for Work and Pensions (DWP) figures which come with a caveat that they are impacted
by Covid-19 (whereas 2019-20 figures were unaffected). Due to the pandemic, the method for
gathering this information changed from focus groups to telephone calls (meaning it wasn’t possible
to verify if actual documents such as payslips etc. were referred to during discussions) and the sample
size was also affected. As a result, the UK Government states “We recommend that all users consider
using the caveat: ‘Data collection for FYE 2021 was affected by the coronavirus (Covid-19) pandemic.
Figures for FYE 2021 are subject to additional uncertainty and may not be strictly comparable with
previous years.’””
Data released in 2023, rela�ng to 2021-22, shows an increase from 24.7% to 29% of children living in
poverty (though the figures are not directly comparable due to methodology).  North Ayrshire
Council established our Child Poverty and Cost of Living Board in June 2022 and published our North
Ayrshire Child Poverty Ac�on Plan 2023-26 in June 2023.  In addi�on, Wellbeing is at the heart of our
new Council Plan 2023-28.
We are working closely with our communi�es and partners to address the drivers of poverty and
help find a sustainable route out of poverty for our most vulnerable families.  This will be reported in
our six-monthly Council Plan Progress Reports and annual Child Poverty Plan Reports. 
314

Page 315

Local Government Benchmarking Framework – September 2023 Analysis Page 7 of 24
Gross rent arrears (all tenants) as a percentage of rent due for the year 
(Please note the axis for this chart is 0-10% for clarity.)  There has been an increase in the percentage
of rent due.  There was a slight increase prior to the ini�al lockdown period of March 2020, but has
increased by three percentage points over two years to 6.63%.  This is lower than other family group
members (where informa�on is available) and in line with the trend for East Ayrshire and Dundee
City Councils.
Propor�on of children mee�ng developmental milestones 
This indicator relates to the propor�on of children mee�ng developmental milestones as reported by
our Health and Social Care Partnership.  The chart axis shows 70-90% for clarity.  Overall
315

Page 316

Local Government Benchmarking Framework – September 2023 Analysis Page 8 of 24
performance appears to be in line with the majority of our family group, with only East Ayrshire and
Dundee City Councils maintaining performance into 2021-22, rather than declining.
Propor�on of pupils entering posi�ve des�na�ons
Though performance has varied over the past decade, the overall trend is posi�ve.  Though 2019-20
may appear to predate the pandemic, this �me period relates to academic years.  As such, it would
have been deeply affected by the lockdown periods.
Data is sourced from Sco�sh Government School Leaver Atainment and Ini�al Des�na�ons
informa�on.  Though data is included for 11 years, the source data notes state due to changes in the
curriculum over the past five years, trends over �me may not be comparable.
Propor�on of council dwellings mee�ng the Sco�sh Housing Quality Standards
316

Page 317

Local Government Benchmarking Framework – September 2023 Analysis Page 9 of 24
The energy efficient elements of the Sco�sh Housing Quality Standards were replaced by the Energy
Efficiency Standard for Social Housing (EESSH) that had to be met by landlords by 2020.  The sudden
drop in performance can be seen na�onally with a sharp decline in the Sco�sh average from 90.3%
in 2020-21 to 68.5% in 2021-22.  
The Improvement Service states:
“The covid pandemic has had a significant impact on councils’ ability to deliver housing services as
normal.  The pandemic affected landlords’ ability to deliver core services such as repairing homes,
letting empty homes, assisting people experiencing homelessness and a range of other services. 
Landlords have had to curtail their planned investment programmes, including those to build new
homes and to achieve the Scottish Housing Quality Standard and the Energy Efficiency Standard in
Social Housing.”
Propor�on of council dwellings that are energy efficient 
North Ayrshire Council is performing well compared to other local authori�es in our family group. 
East Ayrshire has slightly beter performance at 99.53%.  We are significantly higher than the Sco�sh
average of 87.6% and are currently ranked 4th in Scotland for 2021-22.  Though this represents a
slight decrease in ranking as we have been ranked 1st or 2nd since 2016-17, our performance is
consistent.  
317

Page 318

Local Government Benchmarking Framework – September 2023 Analysis Page 10 of 24
Percentage of people aged 65 years and over with long-term health needs who are receiving
personal care at home 
This measure was included in our previous Council Plan 2019-23.  North Ayrshire Council is
con�nuing to improve performance in this area, providing the third best performance in our family
group a�er West Dunbartonshire and East Ayrshire Councils (72.9% and 71.13% respec�vely).  It
should be noted, that due to data completeness issues, some data for this indicator has been
modelled by the Improvement Service. 
Other Services
This sec�on provides an overview of North Ayrshire’s performance within our ‘Other Services’ Family
Group.  This includes indicators rela�ng to Corporate Services, Culture & Leisure, Economic
Development, Environmental Services, Financial Sustainability and Tackling Climate Change.  Local
authori�es included in this comparison are: 
• North Ayrshire Council
• Perth and Kinross Council 
• S�rling Council 
• Moray Council 
• South Ayrshire Council 
• East Ayrshire Council 
• East Lothian Council 
• Fife Council 
318

Page 319

Local Government Benchmarking Framework – September 2023 Analysis Page 11 of 24
CO2 emissions area wide per capita (tonnes)
This measure looks at the CO2 emissions that are area-wide, not only in the scope of North Ayrshire
Council.  It is useful for context.  Lockdown periods did impact emissions in areas such as transport
during 2020-21.
CO2 emissions area wide: emissions within scope of local authority per capita (tonnes)
This measure shows the emissions within the control of North Ayrshire Council.  There has been a
strong decrease in emissions over the past 11 years na�onally across all 32 local authori�es.  North
Ayrshire Council has a commitment to be Net Zero by 2030, this has recently been reiterated within
our new Council Plan 2023-28, with Climate Change being one of our four priori�es for the next five
years.
319

Page 320

Local Government Benchmarking Framework – September 2023 Analysis Page 12 of 24
Claimant count as a percentage of working age popula�on 
This data is based on informa�on available as at July 2023.  North Ayrshire had the highest claimant
count rates as a percentage of working age popula�on within our family group 2021-22.  A rise due
to the pandemic is clearly visible in 2020-21.  2021-22 levels are also higher than the Sco�sh
Average (4.5%).  During the first months of 2023-24, North Ayrshire’s claimant count was 4.6%,
compared to an average of 4% for our family group and 3.2% at Scotland level.  This is related to a
decrease in the number of claimants (a reduc�on of around 3,100 claimants between 2020-21 and
2022-23), rather than an increase in the working age popula�on.
Claimant count as a percentage of popula�on aged 16 to 24 years 
The claimant count for our young people aged 16 to 24 years is slightly higher at 2021-22 than for
the overall claimant count.  Most recent figures available show an improvement to 5.5%, though
320

Page 321

Local Government Benchmarking Framework – September 2023 Analysis Page 13 of 24
higher than the family group average of 4.6% and Sco�sh average of 3.6%.  Again, this is related to a
reduc�on in the number of claimants rather than an increase in popula�on (approximately 1,400
claimants in 2020-21, reducing to approximately 700 in 2023-24).
Propor�on of people earning less than the living wage 
The propor�on of people earning less than the living wage is con�nuing to decrease in North
Ayrshire.  Currently only East Ayrshire Council is performing beter within our family group (9.20%). 
At 11.7% for 2021-22, we are performing beter than the Sco�sh average of 14.4%.  We are currently
ranked 5th across all Sco�sh local authori�es in this area, an improvement from 12th in 2020-21, 9th
in 2019-20 and 19th in 2018-19 which appears to show real progress in this area.
Percentage of unemployed people assisted into work from Council programmes 
321

Page 322

Local Government Benchmarking Framework – September 2023 Analysis Page 14 of 24
The percentage of unemployed people assisted into work from our employability programmes has an
overall posi�ve long-term trend.  This measure can be impacted by how far an individual is from
gaining the skills required to obtain employment, as well as the current unemployment rate.  2020-
21 performance was impacted by a slight increase in the employment rate and a decrease in the
ability to help residents into work due to the pandemic.  During 2021-22, the number of unemployed
people reduced from 3,400 to 2,300 and the performance of our Employability and Skills Team
recovered following the pandemic, with 555 people helped into employment.  This combina�on is
shown as a spike in the chart above.
Gross Value Added (GVA) per capita 
Gross Value Added (GVA) is something we can help influence as a local authority, however it relies on
all industry within North Ayrshire and is monitored for context.  Currently North Ayrshire has a GVA
of £17,553, below the Sco�sh average of £25,758 however, it shows a slight long term posi�ve
trend.  Significant work is ongoing around our Ayrshire Growth Deal and Community Wealth Building
Strategy which should con�nue to influence this.
322

Page 323

Local Government Benchmarking Framework – September 2023 Analysis Page 15 of 24
Immediately available employment land as a percentage of total land allocated for
employment purposes 
As well as ensuring our residents have the skills for good quality jobs available in North Ayrshire, we
also work to ensure there is suitable employment land for businesses wishing to grow or invest in our
area.  We have a greater amount of currently available employment land as a percentage of total
allocated employment than other local authori�es in our family group and the Sco�sh average
(27.2%).  We need to maintain a balance between having enough good quality employment space
available for demand, without crea�ng an excess.  
It is difficult from this data alone to determine whether performance is currently posi�ve.  In
addi�on, it should be noted, that due to data availability issues, some data for this indicator has been
modelled by the Improvement Service. 
323

Page 324

Local Government Benchmarking Framework – September 2023 Analysis Page 16 of 24
Propor�on of procurement spent on local enterprises
This indicator is a useful comparison for benchmarking purposes, however it does not capture all
spend as detailed in our 2020-21 Mid-Year Council Plan Progress Report.  “The LGBF calcula�on
excludes certain spend, most notably it excludes all supplier spend below £1,000 and excludes all
suppliers not categorised as core trade organisa�ons. This is therefore not an accurate reflec�on of
the economic ac�vity within North Ayrshire. As we have access to the source data used by the LGBF
we are able to capture all spend data and refine the calcula�on at a local level to beter capture our
spend with local enterprises and shorten the �me delay in repor�ng.” 
Our in-house local procurement spend measure (CP_10a) shows an increase from 22.93% at 2021-22
to 26.04% at 2022-23.  Embracing Community Wealth Building through providing addi�onal support
for local suppliers including a revised Quick Quote process for lower value procurement is suppor�ng
this area.
324

Page 325

Local Government Benchmarking Framework – September 2023 Analysis Page 17 of 24
Number of business gateway start-ups per 10,000 popula�on 
The number of business gateway start-ups per 10,000 popula�on has decreased during the
pandemic and had not recovered as at 2021-22.  2022-23 figures (not included above) show 11 start-
ups per 10,000 popula�on for North Ayrshire, compared to a family group average of 16.2 and
Sco�sh average of 14.3.  Popula�on can affect this indicator but has remained constant during the
past two years.  The increase in 2022-23 is due to an increase in the number of start-ups from 114 in
2020-21 to 148 in 2022-23.  There is s�ll some work required to return to pre-pandemic levels of 293
start-ups in 2019-20, however the current cost of living crisis is having a detrimental impact on
businesses across the UK.
325

Page 326

Local Government Benchmarking Framework – September 2023 Analysis Page 18 of 24
Town Vacancy Rates 
Town vacancy rates have remained rela�vely consistent.  It has been higher than the Sco�sh average
since 2019-20, though only slightly so in 2021-22 (North Ayrshire vacancy rate is 12.2% compared to
11.4% at Scotland level).  It should be noted, that due to data completeness issues, some data for
this indicator has been modelled by the Improvement Service.
Propor�on of proper�es receiving Superfast Broadband 
This measure is directly linked to the na�onal R100 programme.  It was included in our Council Plan
2019-24 for context but is not directly influenced by North Ayrshire Council.
326

Page 327

Local Government Benchmarking Framework – September 2023 Analysis Page 19 of 24
Street Cleanliness Score 
Street cleanliness was impacted by the pandemic as resources were diverted to other services such
as waste collec�on.  Work is ongoing to recover performance and had reached 86.3% as at
September 2022.  To help address performance, larger capacity street bins and an evalua�on of our
exis�ng street cleaning schedule has been completed, as detailed in our 2022-23 Mid-Year Progress
Report.  A pilot is underway to target poorer performing streets with an increase in the frequency of
cleaning supported by liter educa�onal campaigns in these areas.
Propor�on of total household waste arising that is recycled 
North Ayrshire Council con�nues to perform well in this area, most recent local data shows
performance at 55.3% for 2022-23.  We were one of the few local authori�es to maintain collec�ons
throughout the pandemic. 
327

Page 328

Local Government Benchmarking Framework – September 2023 Analysis Page 20 of 24
Percentage of roads considered for maintenance treatment
328

Page 329

Local Government Benchmarking Framework – September 2023 Analysis Page 21 of 24
The percentage of roads to be considered for maintenance treatment is shown in the four charts on
the previous page and reflects the mixture of rural and urban areas in North Ayrshire.  Most recent
informa�on, from 2022-23 and used as a baseline within our new Council Plan 2023-28, shows 34.8%
of our road network overall should be considered for maintenance treatment.
Propor�on of the highest paid 5% of employees who are women
There is overall a long-term posi�ve trend in this area, increasing from 46.4% in 2010-11 to 61.17% in
2021-22.  
Gender pay gap
329

Page 330

Local Government Benchmarking Framework – September 2023 Analysis Page 22 of 24
Our Equality Mainstreaming report 2020-22 detailed how we are working to reduce horizontal and
ver�cal segrega�on in our workplace.  This also showed a reduc�on in our gender pay gap to 0.22%
in December 2022.
Percentage of income due from Council Tax received by the end of the year 
(Please note:  For clarity the chart axis range is 95% - 100%.)  North Ayrshire Council is performing
least well within our family group.  Perth and Kinross Council has the strongest performance with
97.7% of income due from Council Tax received by the end of the year compared to 93.34% for North
Ayrshire.  This represents £58.5million out of £62.7million (excluding relief and rebates) of Council
Tax owed in 2021-22.  We are currently ranked 31st out of the 32 local authori�es.
Percentage of invoices sampled that were paid within 30 days 
330

Page 331

Local Government Benchmarking Framework – September 2023 Analysis Page 23 of 24
(Please note:  For clarity the chart axis range is 75% to 100%.)  North Ayrshire Council has the
strongest performance within our family group.  This is also higher than the Sco�sh average of
92.2% for Scotland compared to 95.77% for North Ayrshire Council.  We are currently ranked 4th in
Scotland for the speed of our payments.
Percentage of Sco�sh Welfare Fund Crisis Grant decisions made within one day 
The Improvement Service is developing the LGBF to ensure more �meous data is available.  Most
recent data relates to the end of March 2023, when 99.5% of Sco�sh Welfare Fund Crisis Grant
decisions were made within one day, only behind East Ayrshire Council with 99.5% in our family
group.  This is above the Sco�sh average of 91.8%.  This shows strong performance and our
commitment to helping our most vulnerable residents in North Ayrshire.   
331

Page 332

Local Government Benchmarking Framework – September 2023 Analysis Page 24 of 24
Percentage of Sco�sh Welfare Fund Community Care Grant decisions made within 15 days 
As at the end of March 2023, 99.49% of Sco�sh Welfare Fund Community Care Grant decisions were
made within 15 days, second in our family group behind East Ayrshire with 100%.  This performance
has been consistent since 2018-19 and is above the Sco�sh average of 87.3%.  We are currently
ranked joint 4th with Inverclyde Council.
Percentage of opera�onal buildings suitable for their current use 
In North Ayrshire Council, 91.09% of our opera�onal buildings are suitable for their current use.  This
is higher than the family group average of 90.1% and the Sco�sh average of 85.3%.  The number of
opera�onal buildings within North Ayrshire Council has decreased from 334 in 2010-11, to 258 in
2021-22.  Moray Council, who are performing strongest in this area, have considerably fewer
opera�onal buildings, 165 as at 2021-22.
332

Page 333

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet
Title:  Roads Winter Service and Weather Emergencies Plan
2023/24 
Purpose: To seek approval from Cabinet for the Roads Winter Service
and Weather Emergencies Plan 2023/24. 
Recommendation: That Cabinet (a) approves the Roads Winter Service and
Weather Emergencies Plan 2023/24 and (b) notes the
preparations and actions taken which are contained in the
Winter Preparation Action Plan. 
1. Executive Summary 
1.1 North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over public roads which
by definition includes carriageways, footways, footpaths, pedestrian precincts, etc. 
1.2 The Council is also responsible for the management and operation of the coastal flood
protection controls at Largs and Saltcoats. The Council will close the flood gates on the
promenades and erect the flood barriers at Largs Pier in advance of predicted severe
weather with minimum disruption to promenade users and the Largs to Cumbrae ferry.
Coastal flooding can occur at any time and, accordingly, the Council provides this
service throughout the year. 
1.3 A review of the Council's Winter & Weather Emergencies Service was undertaken over
the summer months. The 2023/24 Winter Preparation Action Plan has been developed
to ensure adequate preparations and effective arrangements are in place for 2023/24.
The Winter Preparation Action Plan is included at Appendix 1. 
1.4  The Roads Winter Service and Weather Emergencies Plan 2023/24 is contained at
Appendix 2. 
2. Background 
2.1 In its statutory role as the local Roads Authority, the aim of North Ayrshire Council in
respect of its winter service and weather emergencies is to: 
•  provide a standard of service on public roads which will permit safe movement of
vehicular and pedestrian traffic appropriate to the prevailing weather conditions.
•  establish a pattern of working which will keep delays, diversions, or road closures
to a minimum during adverse weather conditions.
•  conduct operations having regard to the requirements of the Health & Safety at
Work Act 1974 and any other relevant enactments.
Agenda Item 13
333

Page 334

2.2  Separately, the Trunk Road Network is the responsibility of Transport Scotland and
their management contractor, Amey. The Trunk Road network includes the A78, the
A737 from Kilwinning to the Renfrewshire Boundary and A738 from the Pennyburn
Roundabout to the A737 Dalry Road, Kilwinning. 
2.3  All winter gritting and snow clearing operations on the Trunk Road Network are the
responsibility of Amey. The Council’s Roads Team do however liaise on a regular basis
with the trunk road operator during periods of adverse weather in order to provide the
best possible seamless service to the travelling public. 
2.4  The Council’s current updated Winter Preparation Action Plan 2023/24 highlights a
number of key areas where preparation arrangements are being reviewed and
refreshed: 
•  Salt supply resilience, storage and capacity
• Resilience arrangements
•  Grit bins/community resilience 
2.5 Whilst the Council's primary focus is on our Priority Network, our communities have an
expectation of wider assistance during extreme weather, for example in and around
schools, in residential streets, car parking areas etc. There are approximately 500 grit
bins provided on the road network. Salt is also available from a number of supply points
throughout the Council area. Details of planned winter treatments are posted on the
Council’s website. In addition, details of disruption to the road network caused by
adverse weather are also posted on the website. In periods of severe weather Elected
Members are also provided with regular service updates. 
2.6 Road hazard weather forecasting is provided through a collaborative contract led by
South Lanarkshire Council. A new Weather Forecast provider, MetDesk Limited, has
been appointed as the weather forecast provider. During the winter period MetDesk
Limited will provide the weather forecasting service and monitor road and weather
conditions. 
2.7 The Council’s gritting routes have been developed from thermal mapping of the road
network. Thermal mapping is a process by which the variation of minimum night-time
road surface temperature is measured, and this provides the temperature relationship
across the whole network, identifying those sections of the road which are likely to
freeze first. Thermal Mapping identifies colder roads and enables selective targeting of
those areas in need of treatment. Our gritting routes are unchanged for this winter,
details of each Priority route are provided on the Council’s web pages at:
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx   
2.8  A total of 65% of the road network will receive planned treatments. The remaining 35%
of the road network, comprising of minor rural and residential roads, is covered by
Priority 3 routes. All routes will continue to be monitored and reviewed over the winter
period and amended where necessary. 
2.9  Priority 1 routes will be treated on receipt of an adverse weather forecast as detailed in
the decision-making matrix contained in Appendix C of the Winter Service and Weather
Emergencies Plan 2023/24. 
2.10  Priority 2 routes will be treated in addition to Priority 1 routes when sub-zero
temperatures are forecast to extend beyond midday and will be treated following
completion of Priority 1 routes. Generally, the treatment of Priority 2 routes will
commence at 8.00am however appropriate treatment may be instructed at any time
334

Page 335

depending on conditions. 
2.11  Priority 3 routes will generally only be treated following severe weather or when sub-
zero conditions are forecast to continue over an extended period. They will be treated
as resources permit only after all Priority 1 and Priority 2 routes are clear unless
identified as an emergency. 
2.12 Operational resources from Neighbourhood Services (Roads) and Streetscene will be
provided for the Winter and Weather Emergencies Service. The stand-by period for
carriageway treatments will be 19 October 2023 until 11 April 2024. This period may be
extended beyond the given dates if required. These arrangements include home stand-
by which is activated by the designated Winter Supervisor when instructed by the
Winter Controller or as the result of hazardous road conditions being reported.
Arrangements have also been made with Streetscene to assist with the treatment of
priority footways over the winter season and stand-by arrangements are also in place
with Streetscene to treat footways, when necessary, at weekends from 18 November
2023 through to 4 February 2024 and over the festive holiday period. Generally, the
treatment of footways will commence at 8.00am. 
2.13  Last winter season, which was generally a mild winter the Service used 5097 tonnes of
salt, this was similar to the previous year when we used 5,014 tonnes of salt treating
the road network, however in winter 2020/21, which was a colder winter, the Service
used 8,153 tonnes of salt during the winter. A total of approximately 6,500 tonnes of
salt will be stored at our Goldcraigs Depot and 2400 tonnes at our Market Road Depot,
complying with the salt stock levels agreed with the West of Scotland Regional
Resilience Partnership (WoSRRP). In addition, salt will be distributed to Streetscene
Depots to assist with the treatment of footways. Salt usage will be monitored weekly
and stocks will be augmented if necessary. 
2.14  The role of communities to provide their own resilience is recognised and grit bins will
be replenished to allow communities to self-help during periods of adverse weather
within available resources over the winter period. 
2.15  Similar to last winter, winter treatment decisions and any road closures due to adverse
weather will be provided on the Council’s website. 
2.16  A pre-winter planning meeting was held on 3 October 2023 with Managers from across
Council Services. This meeting was held to ensure Services are taking the necessary
steps to prepare for the severities of winter weather. 
2.17  A planning exercise known as the ‘dry run’ was carried out on 29 September 2023 to
check our readiness for the forthcoming winter season. 
2.18  The weather stations on the A760 at Catburn, between Largs and Kilbirnie, and on the
B880 String Road, Arran have been serviced and calibrated and will assist Winter
Controllers and Supervisors in monitoring weather conditions. Cameras are fitted on
the weather stations and images from the these are available to members of the public
through the Council’s website. 
2.19 Each year, a Winter Preparation Action Plan is created to ensure adequate and
appropriate arrangements are being put in place for the forthcoming winter. The
2023/24 Action Plan detailed at Appendix 1 confirms all planned actions are either
complete or are on target. 
2.20 In critical situations should our operational resources be impacted, a reduced priority
network has been developed to ensure that essential transport links can continue to be
335

Page 336

treated during adverse weather conditions.  This minimum resilience network will assist
in maintaining network access for vital services in extreme circumstances. 
3. Proposals 
3.1  Cabinet is asked to approve the Roads Winter Service and Weather Emergencies Plan
2023/24 and note the preparations undertaken as detailed in the attached 2023/24
Winter Preparation Action Plan.  
4. Implications/Socio-economic Duty
Financial
4.1 A budget of £0.552m has been allocated for the delivery of the Roads Winter Service
and Weather Emergencies Plan 2023/24. 
Human Resources 
4.2 The Winter Service and Weather Emergencies Plan will be delivered within existing
resources. 
Legal 
4.3 The Council has a statutory obligation under Section 34 of the Roads (Scotland) Act
1984 "to take such steps as they consider reasonable to prevent snow and ice
endangering the safe passage of pedestrians and vehicles over public roads". 
Equality/Socio-economic 
4.4 The delivery of the Winter Service maintains accessibility to our towns and
communities and supports social and economic activity. 
Climate Change and Carbon 
4.5 This report provides details of operational arrangements in place for responding to
Climate and related weather emergency incidents. There are no carbon issues arising
directly as a result of this report. 
Key Priorities 
4.6 Delivery of the winter service supports the Council Plan priority of keeping North
Ayrshire residents safe. 
Community Wealth Building 
4.7 Delivery of the Winter and Weather Emergencies Service supports Community
Wealth Building by maintaining a resilient road network enabling access to
employment and movement of goods and services. 
5 Consultation 
5.1 Consultation regarding preparations for the forthcoming winter season and the
development of the Winter Action Plan was undertaken with The Ayrshire Civil
Contingencies Team, Transport, Streetscene, Waste Services, Communications,
336

Page 337

Customer Services, North Ayrshire Health and Social Care Partnership, Education,
Housing, Criminal Justice, suppliers, and external organisations. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Neighbourhood Services
on 01294 324570. 
Background Papers
Appendix 1 – Winter Preparation Action Plan 2023-24
Appendix 2 – Winter Service 2023-24
337

Page 338

1
Appendix 1 
NNEEIIGGHHBBOOUURRHHOOOODD  SSEERRVVIICCEESS  --  22002233//2244  WWIINNTTEERR  PPRREEPPAARRAATTIIOONN  AACCTTIIOONN  PPLLAANN   
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
1.0 Policies, Procedures
& Guidance    
1.1 Review Existing Policy
and Procedures
document
Winter and Weather Emergencies
Procedures and Resources Document
reviewed on annual basis. 
Review annually after each
Winter Period.
September
2023
Complete      
2.0 Review of Existing
Winter Maintenance
Operations    
2.1 Existing Priority Gritting
Routes
Priority 1 routes cover 44% of the
network, Priority 2 routes cover 21%
of the network.   
No changes proposed, review
annually.
September
2023  Complete
2.2  Non-Priority Routes Priority 3 routes are treated following
an extended cold spell or following
severe weather. 
No changes.  September
2023 
Complete 
2.3 Footway Gritting Formal arrangement with Streetscene
for assisting with reactive delivery of
the winter service. 
Review annually.  September
2023
Complete
2.4  Assistance from outside
parties
Formal arrangement in place with
local contractors and farmers to assist
in the event of extreme weather
conditions. 
Review annually.  Arrangements
made for a contractor to provide
Gritting on Cumbrae for this
winter.
September
2023
Complete
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
2.5 Gritting of other Council
locations
Education and Housing have
arrangements in place with
Streetscene and Community Justice
for assistance with snow clearing and
gritting. 
Review arrangements annually.  September
2023 
Complete 
338

Page 339

2
2.6 Network Resilience Resilience network developed should
drivers be depleted in extreme
situations (eg. The Pandemic)  
Mutual aid arrangements established
with neighbouring authorities Trunk
Road Operator. 
Review annually  September
2023
Complete      
3.0 Winter Gritting Fleet    
3.1 Winter Gritting Fleet The gritting fleet comprise 13 No. 18
tonne Econ Uni-Bodies and 1 No 7.5
Tonne Econ Uni-Bodies and 1 Trailer
Gritter. 
7 no. new 18 tonne Econ Uni-
Bodies and 1 new 7.5 tonne Multi-
spread to be provided for this
winter season. Vehicles to be
serviced and gritter units to be
calibrated. 
October
2023
Complete      
4.0 Operational Controls    
4.1 Weather forecast
provision
The Council’s weather forecast
service is currently procured by
means of a collaborative contract with
12 other Local Authorities in the South
West of Scotland. 
A new contract is in place for this
winter with MetDesk Limited,
Contract was awarded for 4 years
+ 2 year extension option,
commencing May 2023. 
September
2023
Complete
4.2 Ice Prediction methods North Ayrshire Council has two
weather stations installed on the road
network and has access to a further
two weather stations in the Council
area, provided by Transport Scotland,
on the trunk road network. We also
have access to a number of additional
weather stations on our neighbouring
authorities’ road network. 
Stations to be serviced and
calibrated for start of winter
season. 
September
2023  Complete
339

Page 340

3
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
4.3 Winter Gritting Records Records of winter instructions and
operations recorded on Vaisala
Manager - Winter Roads Management
System. Record footway treatments
undertaken.
Continue to record roads winter
actions on Vaisala Manager -
Winter Roads Management
System. 
September
2023  Complete
4.4 Business Continuity The provision of Winter and Weather
Emergencies Procedures and
Resources document is included
within the Business Continuity Plan. 
Review Business Continuity Plan. Review
Annually  Complete     
5.0 Salt    
5.1 Salt Storage Ensure salt stock complies with
Scottish Government resilience levels
prior to the onset of the winter season. 
7000 Tonnes of salt to be stored
at Goldcraigs Depot and 2400
tonnes to be stored on Arran for
start of winter season. 
Review
Annually  Complete
5.2 Salt Distribution Procedure implemented for salt
distribution throughout Council
Services in place at Depot.
Review and ensure all staff are
aware of procedures annually.
Review
Annually  Complete      
6.0 Communication    
6.1 Information available to
Members, Council
Services, general public
and other stakeholders
Weather forecasts and winter
decisions distributed across Services. 
Roads winter gritting decision posted
on Council Website. 
Details of any road closures due to
adverse weather posted on Website. 
Issue information to Locality
Planning Partnerships. 
Continue to provide information
on the Council website. 
Monitor effectiveness of
information provided on the
Council website. 
Promote Roads Winter Service
during Customer Services Week
and Are You Ready for Winter
campaign.
Oct/Nov
2023 
Review
Annually 
Review
Annually 
Oct/Nov
2023
On target 
Complete 
On target 
On target 
340

Page 341

4     
7.0 Measuring
Performance    
7.1 Monitor performance of
winter actions
Performance is currently measured
using APSE Performance indicators
which measure efficiency in relation to
documented procedures. 
Review annually. October
2023
On target
7.2 Monitor performance on
individual routes
Gritting routes optimised following
thermal mapping exercise undertaken
during winter season 2018/19.
No changes proposed, review
annually.
September
2023
Complete
7.3 Improve efficiency of
gritting operations
Winter decisions are made based on
thermal mapping exercise carried out
during winter 2018/19. 
No changes proposed, review
annually.
September
2023
Complete      
8.0 Training    
8.1 Winter Service Training Staff trained in delivery of winter
service. 
Identify training needs of
personnel involved with the
provision of the winter
maintenance service.  Arrange
appropriate training. 
Review
Annually 
Complete 
8.2 Severe Weather
Exercise
Ayrshire Local Resilience Partnership
arrange Severe Weather tabletop
exercises periodically.
Appropriate attendance at ALRP
exercises as arranged.
As arranged. Complete      
9.0 Health & Safety    
9.1 Toolbox Talks Toolbox talks are delivered to all
personnel engaged in the delivery of
the winter maintenance service.
Review annually and provide
toolbox talk at the start of each
winter.
Annually Complete 
341

Page 342

APPENDIX 2 
Neighbourhood Services 
Roads Winter Service
and
Weather Emergencies Plan 
2023 – 2024 
Cunninghame House
IRVINE
Ayrshire KA12 8EE
Tel:      01294-310000
342

Page 343

1 | P a g e
CONTENTS  
Page No 
1. Introduction 2       
2. Priorities for Winter Treatment 3
3. Organisation 5
4. North Ayrshire Council Resources (Roads) 6      
5. Other Resources 7
6. Weather Forecasting 8
7. Decision Making 8
8. Ice Prediction 9
9. Road Condition Reports 9
10. Communications 9
11. Road Closures 10
12. Liaison with the Police 10
13 ALRP Disruptive Weather Response Arrangements 11
14. Cross Boundary Arrangements 11
15. Vehicle Routes 11
16. Precautionary Salting 12
17. Grit Bins 12
18. Largs and Saltcoats Flood Protection Schemes 12
19. Sandbag Procedures 12 
Appendix A - Priority1 Carriageway Gritting Routes
Appendix B - Level of Service
Appendix C - Decision Making        
Appendix D  - Summary of Available Labour & Plant       
Appendix E - Community Grit Bins        
Appendix F - Summary of Available Materials
Appendix G - Salt Resilience
Appendix H  - Contacts Arrangements 
Appendix I - Distribution List
Appendix J - Bridges with weight or height restrictions
Appendix K  - Arrangements with other Authorities
Appendix L - Grit Bin Policy and Procedure 
Appendix M  - Resilience Network
343

Page 344

2 | P a g e
1. INTRODUCTION 
North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow
and ice endangering the safe passage of pedestrians and vehicles over public
roads which by definition includes carriageways, footways, footpaths, pedestrian
precincts, etc. 
In its statutory role as the local Roads Authority, the aim of North Ayrshire Council
in respect of its winter service and weather emergencies is to:- 
(i) provide a standard of service on public roads which will permit safe
movement of vehicular and pedestrian traffic appropriate to the prevailing
weather conditions. 
(ii) establish a pattern of working which will keep delays, diversions, or road
closures to a minimum during adverse weather conditions. 
(iii) conduct operations having regard to the requirements of the Health & Safety
at Work Act 1974 and any other relevant enactments. 
This Plan only relates to the Council’s duties as Roads Authority and does not cover
the wider response of the Council during winter and other weather emergencies. 
North Ayrshire Council has no responsibility for the treatment of trunk roads. From
1st April 2001, the contract for management and maintenance of the trunk roads in
Scotland has been awarded by the Scottish Government to the private sector. The
successful contractor for the South West of Scotland is Amey and the roads
involved in North Ayrshire are as follows:- 
A78 full length from Meadowhead roundabout, Dundonald to Inverclyde boundary
at Skelmorlie. 
A737 Dalry Road, Kilwinning to Renfrewshire boundary. 
A738 Pennyburn roundabout to A737 Dalry Road, Kilwinning 
All winter gritting and snow clearing operations on these roads will be the
responsibility of Amey. North Ayrshire Council’s Neighbourhood Services (Roads)
and Amey liaise on a regular basis during periods of adverse weather in order to
provide the best possible service to the travelling public. 
North Ayrshire Council is also responsible for the management and operation of the
coastal flood protection controls at Largs and Saltcoats. The Council will close the
flood gates on the promenade and erect the flood barriers at Largs Pier in advance
of predicted severe weather with minimum disruption to promenade users and the
Largs to Cumbrae ferry. Coastal flooding can occur at any time and, accordingly,
the Council will provide this service throughout the year. 
In the event of extreme weather similar to that which was experienced on Arran late
March 2013 where major disruption affects large parts of the community, a
344

Page 345

3 | P a g e
coordinated response is adopted by the Council to ensure public safety.  In dealing
with such emergencies, the Police initially lead the emergency or response stage of
the emergency. Thereafter, the Council leads the recovery stage. Generally, there
are 3 levels of Civil Contingencies response. There is a strategic group at National
or Strathclyde wide level, a tactical group at North Ayrshire level and an operational
group at local level. 
The Ayrshire Civil Contingencies Team (ACCT) act as lead for the Council and
implement the Civil Contingencies Plan liaising with all relevant Stakeholders
identified within the Plan. 
2. PRIORITIES FOR WINTER TREATMENT 
North Ayrshire Council has defined the priorities for carriageway and 
footway/footpath treatment as follows: 
2.1.1 Carriageway Priorities 
Where slush is formed, this shall be removed as soon as practicable to avoid the
risk of rutting should there be a further significant fall in road temperatures which
might result in freezing conditions. 
2.1.2 Carriageway Routes for Proactive Treatment 
Priority 1 – Strategic, Main Distributor and Distributor routes, bus routes and
certain pre-determined Secondary Distributor routes identified from the Local
Transport Strategy (LTS) will be treated when it is forecast that snow or ice is likely
to be present on road surfaces. 
Due to the various climatic domains within North Ayrshire the Priority 1 routes may
be adjusted to cover either the four pre-determined Inland Routes or two pre-
determined High Routes which all currently form part of our existing Priority
Network. 
Priority 1 gritting routes are available on the Council website (See Appendix A). 
2.1.3 Carriageway Routes for Reactive Treatment 
a) Priority 2 – Remaining Secondary Distributor, local access and residential
distributor roads. 
Given the presence of ice and snow Priority 2 routes may be treated during normal
working hours as resources permit when sub-zero temperatures are forecast to
continue beyond midday following completion of Priority 1 routes. 
b) Priority 3 – The remaining road network including minor rural unclassified routes
and remaining residential areas not already covered. 
345

Page 346

4 | P a g e
Priority 3 routes will be treated as resources permit when sub-zero conditions are
forecast to continue over an extended period only after all Priority 1 and Priority 2
routes are clear unless it is identified as an emergency. 
2.1.4 Carriageway Routes for Snow Clearance 
On receipt of a weather warning predicting medium (25 - 100 mm deep) or heavy
(over 100 mm deep) snowfalls, the Senior Manager (Network) where appropriate,
will recall to depots such vehicles capable of being equipped with snowploughs. 
While snow is still falling the Strategic and Main Distributor Network will be
prioritised for ploughing and treatment in order to target resources and to keep
these routes open for traffic. 
After snow has stopped falling but is lying, the remaining Priority 1 precautionary
routes will be ploughed and treated before commencing ploughing and treatment on
Priority 2 and Priority 3 routes as resources and conditions permit. 
2.1.5 Cumbrae 
There are no Roads Operatives based on the Isle of Cumbrae, however contract
arrangements have been made to carry out gritting operations on the Island.   
2.2 Footway/Footpath Priorities 
With limited resources available footways and footpaths will only be treated when
considered necessary (e.g. heavy snowfall or extensive icing).    They will normally
only be treated during normal working hours (commencing from 8:00am), but
arrangements are in place to undertake emergency work out of normal working
hours, weekends and public holidays in extreme circumstances. 
Generally, treatment of footways and footpaths will be reactionary and not pre-
planned, and where possible work will be undertaken during normal working hours. 
When treatment is instructed the following priorities will apply:- 
Priority 1 Routes will be considered for treatment if it is forecast that ice or snow is 
likely to be present or where surfaces are wet with temperatures forecast to 
remain below zero until 10:00am the next working day. 
Priority 1 Routes - Urban shopping areas and precincts, footway access to 
schools, emergency facilities including fire and rescue, 
police and ambulance services, hospitals, sheltered    
housing, doctors surgeries and health centres etc; 
Priority 2 routes will be treated if it is forecast that ice or snow is likely to be present
with temperatures forecast to remain below zero for a prolonged period only after
priority 1 routes are clear. 
Priority 2 Routes -  Steep hills on main distributor and residential distributor routes,  
routes to bus stops etc, only after all Priority 1 have been 
cleared;
346

Page 347

5 | P a g e
Priority 3 routes will be treated if it is forecast that ice or snow is likely to be present
with temperatures forecast to remain below zero for a prolonged period only after
priority 1 and 2 routes are clear. 
Priority 3 Routes - Other areas of high pedestrian concentration. 
Streetscene staff will assist with the treatment of footways. 
In order to maximise coverage on footways, generally only one side of a road will be
initially treated. 
It is not possible for the Council to treat all footways and footpaths within North
Ayrshire. As such the Council encourages the community to participate in self help,
through the use of grit bins which can be requested through the grit bin application
process. Grit bins will only be allocated where it has been assessed and deemed as
an appropriate location by the Council. 
2.3 Cycle Routes 
With limited manpower resources no treatment will be carried out on off road 
cycle routes. 
2.4 Response and Treatment Times 
Routine precautionary salting of priority 1 carriageway routes should be completed 
within 3 hours of the planned start time. For emergency or unplanned salting, the 
start time from leaving the depot shall be no more than 1 hour. 
3. ORGANISATION 
The Head of Neighbourhood Services is responsible for specifying the level of
winter service required based on approval from the Council. The Senior Manager
(Network) is responsible for implementing this service. 
A duty Winter Controller and Winter Supervisor will be appointed by the Senior
Manager (Network) for the whole of the winter period covered by these procedures
(mid-October to early April)
347

Page 348

6 | P a g e
4. NORTH AYRSHIRE COUNCIL RESOURCES (ROADS) 
4.1 General 
Following approval from the Council, it is the responsibility of the Head of
Neighbourhood Services to define the level of service to be provided within their
sphere of operations and to issue appropriate instructions to the Senior Manager
(Network) to provide the necessary labour and plant for winter operations. This level
of service will be based on the national Code of Practice for Well Manahed Highway
Infrastructure (see Appendix B). 
The level of winter treatment is established utilizing the weather forecasts provided
by MetDesk Limited in accordance with the winter treatment matrix (Appendix C). 
The Senior Manager (Network) shall thereafter be responsible for advising the Head
of Service of any matters which may affect his ability to deal with adverse weather
conditions e.g. labour disputes, extensive plant breakdowns etc. 
Labour resources from Neighbourhood Services (Roads) will be provided for the
Winter and Weather Emergencies Service. The stand-by period will be 19th October
2023 until 11th April 2024. This period may be extended beyond the given dates if
conditions warrant such action. These arrangements include home stand-by which
is activated by the designated Winter Supervisor when instructed by the Winter
Controller or as the result of hazardous road conditions being reported.  
4.2 Labour 
A proportion of the roads labour force will be on stand-by for winter service
operations out of normal working hours, with the remainder on call out as
necessary. This allows evening and early morning precautionary salting to be
carried out on our priority carriageway network to treat dangerous roads before the
morning rush hour.   
In determining the labour resources required for the winter service, cognisance is
taken of the key objective to treat all priority routes before the commencement of
the morning peak period. 
4.3 Vehicle Plant and Equipment 
Prior to commencement of winter service operations, the Senior Manager (Network)
will ensure that all equipment for salting roads and snow clearing is in working order
and, where appropriate, that ancillary items can be fitted to vehicles without
difficulty, e.g. ploughs set up on blocks to facilitate assembly. The above procedure
should also be applied to vehicles and plant available under contract for the winter
service. 
The Senior Manager (Network) will ensure that all vehicles engaged in the winter
service are equipped with radios or other appropriate communication devices to
allow contact to be maintained between the depot and operators. Superintendents
have mobile telephones. There is also vehicle tracking system fitted and operational
in all vehicles to reduce the risk associated with gritting operations. 
348

Page 349

7 | P a g e
A summary of labour, vehicles, plant, and equipment available for the winter service
work is detailed in Appendix D. 
Once per year the Senior Manager (Network), will organise a trial closure of the
flood gates and erection of the de-mountable barriers at the Largs and Saltcoats
flood protection controls. This is to ensure that the gates and barriers remain in full
working order and that all staff are familiar with the process. 
4.4 Salt 
Salt is purchased through a Scotland Excel annual purchase contract. Mainland salt
deliveries are stored in the salt barn within the Goldcraigs Depot. Salt on Arran is
stored in the open at the Roads Depot in Market Road, Brodick.  
During the season, the Senior Manager (Network) will arrange for a weekly check to
be made on the amount of salt used and for stocks to be augmented as necessary.
There is a procedure in place at the depot to strictly control salt distribution. All
vehicles are tagged and must cross the weighbridge to accurately record salt
usage. This includes salt distributed to Streetscene and contractors assisting with
winter service delivery. 
Small quantities of salt are available for issue free of charge to the public, subject to
residents supplying a suitable container. Details of locations of community grit bins
where small quantities of salt are available are given in Appendix E 
The planned salt stock level at commencement of winter is given in Appendix F. 
In the event of prolonged severe weather, the Council has a salt resilience plan
(Appendix G), which will be implemented if conditions require. 
5. OTHER RESOURCES 
During adverse weather conditions, the Senior Manager (Network), (after
consultation with the Head of Neighbourhood Services), shall, if necessary,
augment his resources by the use of personnel from Streetscene and external
contractors at rates agreed prior to engagement through a framework contract.  The
Head of Neighbourhood Services should be advised, as soon as practicable, of
external resources engaged as a result of decisions made outwith normal working
hours. 
The Senior Manager (Network) will provide a supply of salt to Streetscene and
external contractors where appropriate to permit the treatment of agreed
footways/footpaths.  This will be managed through a salt management system
based at Goldcraigs Roads Depot. 
349

Page 350

8 | P a g e
6. WEATHER FORECASTING 
North Ayrshire Council, through a collaborative contract led by South Lanarkshire
Council, has appointed MetDesk Limited, as their weather forecast provider.  During
the winter service period MetDesk Limited will provide a weather forecasting service
and monitor road and weather conditions.  
The forecasters receive, monitor and interpret, climatic, ice prediction and weather
radar information on a continuous basis and provide detailed weather forecasts on
a daily basis during the whole winter period. 
SEPA operate a coastal flood warning system for the Firth of Clyde.  If storm surges
and coastal flooding are predicted, SEPA provide advance warning to the Council
by e-mail and also through their Floodline service which is available on their website
or by phone.  This service is available all year round. 
7. DECISION MAKING 
The Senior Manager (Network) will appoint suitably trained and experienced
personnel as Winter Controllers. 
During the winter season the Winter Controller will receive the weather forecast
around 12.00 hours and decide on the treatment to be carried out. The Winter
Controller will check the treatment decision of neighbouring authorities for
consistency and reconsider if necessary. The weather forecast provider will provide
an evening forecast around 18.00 hours and if this update indicates any change in
the forecast the Winter Controller will amend the decision accordingly and advise
the Winter Supervisor. 
For out of office hours, Saturdays, Sundays and public holidays the Senior Manager
(Network) shall provide the weather forecast provider with contact telephone
numbers of the on duty Winter Controller. If the forecast conditions change from
good to adverse at any time, then the weather forecast provider will phone the
Winter Controller either at work or at home as appropriate. Thereafter, it is the
responsibility of the Winter Controller to take action including the calling out of
stand-by squads to undertake salting/snow clearing. 
Winter Controllers have the facility at any time to contact the weather forecast
provider for advice or clarification of forecasts. These arrangements will be in place
from 12 October 2023 until 11 April 2024 and these dates can be extended if
required. 
The decision making process is illustrated in Appendices B & C. 
The Head of Neighbourhood Services will appoint suitably trained staff and
experienced personnel to manage the coastal flood prevention schemes at Largs
and Saltcoats.  During the winter season, this will be the Winter Controller. 
350

Page 351

9 | P a g e
8. ICE PREDICTION 
In addition to the weather forecast information, the Council has available further
information from sensors which have been installed at the locations listed below:- 
• A78 Ardrossan
• A737 Highfield
• A760 Catburn
• A735 Near Dunlop
• B880 Arran, summit of The String 
The sensors provide current details of road and air temperatures and indicate the
presence of moisture, thereby identifying locations that icing has occurred or where
there is a risk that icing will occur. 
By utilising the data from these sensors the weather forecast provider is able to
supplement their forecast by producing site specific forecasts. The above
information is available to the Winter Controller via computer link 24 hours a day
throughout the winter period. 
9. ROAD CONDITION REPORTS 
During periods of adverse weather, the Senior Manager (Network) shall receive
reports on road conditions from the Winter Supervisor by 09.45 hours. These
reports should be updated as necessary depending on changing circumstances. 
10. COMMUNICATIONS 
The Head of Neighbourhood Services or nominated senior manager will deal with
statements to the Press, Radio and Television regarding road conditions throughout
the area.  The Council’s Communication team will assist and may take the lead role
depending on the nature of any significant event. 
General advice and information, along with timeous service updates, will be placed
on the Council’s website. 
The Head of Neighbourhood Services (or nominated senior officer) will ensure that
all staff involved in communication with members of the public are fully briefed with
consistent and accurate information. 
A protocol has been agreed by the West of Scotland Regional Resilience
Partnership (WoS RRP) and Ayrshire Civil Contingencies Team (ACCT) for the
transfer of information in relation to Winter and Weather Emergencies. 
The Council’s daily winter decisions are available for the public and can be
accessed via the Council’s website.  Any winter and weather emergencies can be
reported to North Ayrshire Council and the Trunk Road Operators using the contact
information contained within Appendix H. 
The distribution list for winter weather emergencies can be found under Appendix I.
351

Page 352

10 | P a g e
11. ROAD CLOSURES 
Where it is considered that a road is rendered unsafe due to adverse winter
conditions then the Police or persons acting on behalf of the Chief Constable will
arrange to have the road closed and advise the on-duty Winter Supervisor as soon
as possible of their actions. The Winter Supervisor will advise the Winter
Controller/Senior Manager (Network) of any road closures. Appropriate measures
will also be taken to re-direct traffic and to ensure that the necessary signs are put
in place. When the road affected is a through route the adjoining Councils will be
kept informed. Police will advise the other emergency services (Ambulance & Fire)
of the closures. 
Prior to signing diversionary routes, the capacity of the roads and the headroom
and weight restrictions of structures should be checked with the Winter Controller to
ensure that they are adequate (see Appendix J). 
12. LIAISON WITH THE POLICE 
Neighbourhood Services (Roads) will ensure close liaison with the Police,
particularly during periods of severe weather. 
Where practicable, the Police will be informed in advance of North Ayrshire
Council’s proposed operations. Similarly, arrangements have been made for
exchanging information on proposed actions with neighbouring authorities and the
trunk road operating company. 
Where necessary the service will request appropriate assistance from the Police
when moving equipment, arranging road closures, and dealing with abandoned
vehicles. 
Reports from the Police regarding dangerous road conditions should be acted upon
by the Winter Supervisor as soon as practicable, having regard to priorities in this
document and the conditions pertaining throughout the area. 
352

Page 353

11 | P a g e
13. AYRSHIRE LOCAL RESILIENCE PARTNERSHIP (ALRP) DISRUPTIVE
WEATHER RESPONSE ARRANGEMENTS 
There have been a number of occasions when severe weather including high
winds, heavy rain and snow has caused disruption to communities and services in
Ayrshire. Arrangements are in place where partner organisations can trigger the
ALRP Disruptive Weather Response Arrangements. The purpose of these
arrangements are:- 
• To protect human life, property, and the environment
• To implement a professional and co-ordinated multi-agency response to the
incident in conjunction with our communities
• To maintain wider public confidence in the multi-agency response and
minimise general community and infrastructure impact
• To ensuring that all possible measures are in place to protect vulnerable or
displaced members of the community
• To supporting effective public communication in regard to the incident along
the principles of warning and informing
• To ensure awareness of the potential impact of events out with Ayrshire on
the local multi-agency response
• To ensuring that organisational and partnership learning points are captured
to ensure a continuing focus on safeguarding the public 
14. CROSS BOUNDARY ARRANGEMENTS 
Because the Council boundaries do not always coincide with convenient turning
points at the end of gritting routes, arrangements have been drawn up with all
adjacent authorities for the gritting routes to be continued short distances to
appropriate turning points. See (Appendix K). 
15. VEHICLE ROUTES 
A thermal mapping exercise was undertaken on North Ayrshire’s road network over
winter season 2018/19 and routes have been developed by the Roads Service on
the basis of the priorities listed in Section 2. However, in order to minimise
unproductive mileage, some roads in a lower category may be treated out of
sequence. This may also occur when conditions vary throughout the area. 
A complete set of route cards will be kept in the Commercial Services (Roads)
offices, with a duplicate set being held in Goldcraigs Depot. 
Treatment of precautionary carriageway salting routes should be completed within
three hours of planned start time under routine conditions. When the Winter
Controller instructs immediate winter service operations, the response time to start
treatment should be within one hour. 
It should be noted that gritting routes are either at or close to capacity and it is
unlikely that any additions to routes could be considered without additional finance
and human resources. 
353

Page 354

12 | P a g e
16. PRECAUTIONARY SALTING 
On receipt, within normal working hours, of a forecast from the weather forecast
provider warning of frost, freezing or snow conditions, the Winter Controller in
consultation with the Senior Manager (Network), shall give consideration to
precautionary salting of main roads. 
Where such a warning is received out with normal working hours, the Winter
Controller has delegated authority to activate call-out procedures as indicated in
Section 7. 
Extensive and accurate records of weather forecasts, winter treatment decisions
and actions taken will be kept to demonstrate our compliance to our Winter and
Weather Emergencies Plan. 
17. GRIT BINS 
There are approximately 500 grit bins distributed across North Ayrshire. These are
located at areas of particular difficulty e.g. dangerous bends, steep gradients etc.
The policy and procedures for siting of grit bins, and requests for additional bins is
shown in Appendix L. 
Grit bins will be refilled prior to the start of winter and as considered necessary
during the winter season and following periods of severe weather when resources
are available. 
The locations of Community Grit Bins are listed in Appendix E. 
18. LARGS AND SALTCOATS FLOOD PROTECTION SCHEMES 
On receipt of a severe weather warning predicting a combination of strong winds,
high tides or tidal surges the Winter Controller will, when necessary, instruct the
closure of the flood gates on the promenade at Largs and/or the erection of the
flood barriers at the Largs Pier and/or Saltcoats promenade. 
19. SANDBAG PROCEDURES 
The deployment of sandbags to prevent or contain floodwaters can be an effective
way of mitigating the effect of a flood, however the lead time for filling and
deployment can be lengthy, as a large number of bags cannot be filled in advance
due to storage problems. Therefore, an early decision must be taken to sandbag, to
avoid a subsequent waste of time and effort. The deployment of sandbags will be
decided with regard to the following priorities: 
1. To prevent loss of life or serious injury 
2. Maintenance of access for the emergency services 
3. Protection of vital facilities within the community 
4. Protection of transportation routes 
5. Protection of NAC property 
6. Protection of private dwelling houses 
354

Page 355

13 | P a g e
The decision to deploy sandbags will be made by the Winter Controller / Supervisor
or appropriate officers in Building Services, Cleansing or the Island Officer on Arran
in accordance with the Services' callout/emergency procedures. 
Notes: 
1. Sandbags will not normally be deployed to protect commercial property;
2. Appropriate stocks of empty and filled sandbags will be held by the Services
mentioned above, based on previous usage and experience. 
The above procedure mainly relates to tidal, fluvial and watercourse flooding. 
Where flooding occurs as a result of a blocked, damaged or ineffective Council
owned drainage systems, sandbags will be deployed as required to mitigate the
effects of flooding (and reduce the likelihood of claims against the Council) including
the protection of commercial property. 
20. Resilience Arrangements 
In critical situations should our operational resources be reduced, a minimum
resilience network for winter gritting has been prepared. Should we have to reduce
our level of service due to an extreme situation our priority gritting routes will reduce
from 6 to 3. On Arran we may require reducing from 2 to I gritting vehicle covering
the island routes and the treatment time for gritting operations will increase
accordingly. 
The Head of Service will decide if the level of service has to be reduced due to
extreme situations. 
Details of our resilience network are attached as Appendix M. 
355

Page 356

14 | P a g e
Appendix A 
Priority 1 Carriageway Gritting Routes 
Policy & Procedure 
Priority 1 Gritting Routes can be viewed on the Councils website using the following
address:- 
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx 
356

Page 357

15 | P a g e
Appendix B 
LEVEL OF SERVICE 
Road Surface
Temperature
Precipitation Predicted Road Conditions  
Wet Wet Patches Dry 
Temperature
Forecast 
between
+1.5oC
And +0.5oC 
No Rain
No Hoar Frost
No Fog 
High Route Patrols  No action likely 
Temperature
Forecast 
below +0.5oC 
No Rain
No Hoar Frost
No Fog 
(Priority  1 Routes) 
Salt before frost  Expected
Hoar Frost
Expected Fog 
Expected rain
BEFORE
freezing 
(Priority  1 Routes) 
Salt after rain stops 
Expected rain
DURING
freezing
(Priority  1 Routes) 
Salt before frost, as required during rain and after
rain stops 
Possible rain
Possible hoar
frost
Possible fog
(Priority  1 Routes) 
Salt before frost 
Monitor
weather
conditions 
Expected Snow Fall
(Priority  1 Routes and footways) 
Salt before snow fall 
The decision to undertake precautionary treatments should be adjusted, where
appropriate, to take account of residual salt. 
All decisions should be evidence based, recorded and continuously monitored and
reviewed. 
357

Page 358

16 | P a g e
Appendix C 
DECISION MAKING 
Rate of spread for precautionary treatments may be adjusted to take account of local
variations along the routes such as residual salt, temperature variations, surface moisture
(air or road surface) road alignment and traffic density. 
All decisions should be evidence based, recorded and require continuous monitoring and
review. 
Ice refers to all ice on the road surface, including black ice. 
The level of service generally complies with the recommendations laid down in “NWSRG 
best practice guide for Winter Salt” as recommended in the Well Managed Highway 
Infrastructure Code of Practice and takes account of recommendations by the SCOTS
Winter Group following a review of the Code of Practice and consultation with the National
Winter Service research Group (NWSRG). 
WINTER TREATMENT SPREAD RATE MATRIX 
Recommended Spread Rates – Dry Salting (g/m2) 
Road Surface Temperature
(RST) when frost/ice is
predicted and road wetness.
Poor Cover
(salt stored 
uncovered) 
Medium Traffic 
Normal Loss
Good Cover
(salt stored 
under cover) 
Medium
Traffic 
Normal Loss 
Comments
RST at or above -2 deg and dry
or damp road conditions  10  10 
RST at or above -2 deg and 
wet road conditions  15  10 
RST below -2 deg and above - 5
deg and dry or damp road
conditions 
(15 or 20)  (10 or 15)
Spread rate dependent on 
residual salt on road surface
RST below -2 deg and above - 5
deg and wet road conditions
(1 x 20 & monitor
& treat as
required) 
20 
RST at or below -5 deg and 
above -10 deg and dry or 
damp road conditions
(1 x 20 & monitor
& treat as
required) 
20
Spread rate dependent on 
residual salt on road surface
RST at or below -5 deg and 
above -10 deg and wet road 
conditions
(1 x 20 & monitor
& treat as
required)
(1 x 20 &
monitor & treat
as required) 
358

Page 359

17 | P a g e
Salt Type
Precautionary
Treatments Before
Snow or Freezing
rain  
Light or Medium
Traffic Heavy Traffic    
Dry Salt
Light Snow Forecast
20g/m2 20g/m2
Pre-wet
Salt 20g/m2 20g/m2
Treated
Salt 15g/m2 15g/m2
Dry Salt
Moderate/Heavy
Snow Forecast
20g/m2 40g/m2
Pre-wet
Salt 20g/m2 40g/m2
Treated
Salt 15g/m2 30g/m2
Dry Salt
Freezing rain
Forecast
1 x20g/m2 then monitor
Pre-wet
Salt 1 x20g/m2 then monitor
Treated
Salt 1 x15g/m2 then monitor   
359

Page 360

18 | P a g e
Appendix D
SUMMARY OF AVAILABLE LABOUR & PLANT 
TYPE OF PLANT  GOLDCRAIGS  ARRAN  OTHER
NAC 
TOTAL
Gritters 
18 Tonne Uni-body 10 3  13
7.5 Tonne Uni-body 1 0  1
Trailer Gritter 0 0 1 1
Footway Gritter  1 1 7 9
Lorries 
18 Tonne Uni-body
26 Tonne Multi-lift
10
1
3
0
13
1
7.5 Tonne Uni-body 1 0  1
Tractor 0 1  1
JCB 2CX 0 1  1
Telehandler  1 1  2 
Ploughs 
Fixed V 3 2  5
Small Blade 1 1  2
Large Blade 12 3  15 
LABOUR    
Drivers 
Pickup Drivers
Operatives 
22
7
4 
6
3 7
36
28
17
40
Other Equipment    
Muck Truck + plough
(For footways)  
2 2     
Note   
When necessary labour, vehicles, plant and equipment from other 
Council Departments, farmers, plant hirers and contractors will be used 
to supplement above resources. 
This also applies for non-winter related emergency responses.
360

Page 361

19 | P a g e
Appendix E 
COMMUNITY GRIT BINS 
Small quantities of salt are available for issue free of charge to members of the public,
subject to their supplying a suitable container from the Community Grit Bins sited at the
following locations. 
Town Location
Ardrossan Carpark, North Crescent Road.
Beith Community Centre, Kings Road.
Brodick Household Waste Recycling Centre
Dalry Car Park, Kirk Close.
Fairlie Car Park, Pier Road. 
Irvine Bartonholm Civic Amenity Site.
Kilbirnie Cleansing Depot, Paddockholm Road.
Kilwinning Byrehill Place (off Pennyburn Road)
Lamlash Council Office
Largs Cleansing Depot, Alexander Avenue.
Millport Kepple Pier
Saltcoats Cleansing Depot, Mid Dykes Road.
Skelmorlie Toward View (opposite Fire Station).
Stevenston Car Park, Garnock Road.
West Kilbride Community Centre, Corse Street. 
361

Page 362

20 | P a g e
Appendix F 
SUMMARY OF AVAILABLE MATERIALS 
The following salt, grit and sand stocks will be in place at commencement of winter:- 
DEPOT TONNAGE
SALT
TONNAGE SAND 
(for Sandbags) 
Goldcraigs  (salt barn) 6500  100 
Arran  2400 300 
Cumbrae   20 (500 filled sandbags) 
Approximately 4000 sandbags are located at Goldcraigs, and 500 on Arran.
362

Page 363

21 | P a g e
Appendix G 
Salt Resilience Plan (Mainland) 
Level  1 (Green) Service – Stock Levels 2500 Tonnes and above 
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 470T – resilience 5 days                                                      
or
• Typical daily salt usage (frost & ice only) 235T – resilience 10 days 
Level  2 (Amber 1) Service – Stock Levels 1800 Tonnes – 2500Tonnes 
• Only Priority 1 carriageway routes treated with pure salt, remaining priority carriageway
routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 330T – resilience 2 days.                                                    
or
• Typical daily salt usage (frost & ice only) 165T – resilience 4 days 
Level  3 (Amber 2) Service – Stock Levels 1000 Tonnes – 1800 Tonnes 
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix at 50/50
• Typical daily salt usage (snow conditions) 150T – resilience 5 days.
or
• Typical daily salt usage (frost & ice only) 75T – resilience 10 days 
Level 4 (Red) Service – Stock Levels less than 1000Tonnes 
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at 50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 100T – resilience 10 days
or
• Typical daily salt usage (frost & ice only) 50T – resilience 20 days 
Assuming 7000 tonnes in stock at start of winter our total resilience would be either 
• Total Resilience during periods of heavy snow - 27 days
or
Total Resilience during periods of frost & ice conditions - 54 days 
363

Page 364

22 | P a g e
Salt Resilience Plan (Arran) 
Level  1 (Green) Service – Stock Levels 1000 Tonnes and above 
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 52T – resilience 10 days                                                      
or
• Typical daily salt usage (frost & ice only) 26T – resilience 20 days 
Level  2 (Amber 1) Service – Stock Levels 550 Tonnes – 1000Tonnes 
• Only Priority 1 carriageway routes treated with pure salt, remaining priority carriageway
routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 44T – resilience 10 days.                                                      
or
• Typical daily salt usage (frost & ice only) 22T – resilience 20 days 
Level  3 (Amber 2) Service – Stock Levels 250 Tonnes – 550 Tonnes 
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50
• Typical daily salt usage (snow conditions) 30T – resilience 10 days.
or
• Typical daily salt usage (frost & ice only) 15T – resilience 20 days 
Level  4  (Red) Service – Stock Levels less than 250 Tonnes 
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at 50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 20T – resilience 12 days
or
• Typical daily salt usage (frost & ice only) 10T – resilience 25 days 
Assuming 1,900 tonnes in stock at start of winter our total resilience would be either 
• Total Resilience during periods of heavy snow  - 49 days
or
Total Resilience during periods of frost & ice conditions - 98 days 
364

Page 365

23 | P a g e
Appendix H 
NORTH AYRSHIRE COUNCIL 
CONTACT ADDRESS & TELEPHONE NUMBERS 
During Normal Working Hours  Outwith Normal Working Hours 
MAINLAND 
Neighbourhood Services
(Roads) 
Cunninghame House
IRVINE
KA12 8EE 
Tel:  01294-310000 
NORTH AYRSHIRE COUNCIL
CALL CENTRE 
Road & Lighting Faults 
24 hours, 7 days per week 
Tel:   01294 310000 
ARRAN 
Arran Local Office
Lamlash
Isle of Arran
KA27 8JY 
Tel:  01770-600338
Fax: 01770-600028 
TRUNK ROADS
A78, A737 & A738 
Amey
Network Control Centre
150 Polmadie Road
Glasgow
G5 OHD 
Control Room
0800 042 0188
OCCR-southwest@amey.co.uk 
365

Page 366

24 | P a g e
Appendix I 
DISTRIBUTION LIST 
Copies 
North Ayrshire Council
Chief Executive 1
Executive Director: Place 1
Executive Director: Communities & Education 1 
Head of Neighbourhood Services 1
Head of Housing and Public Protection 1
Head of Democratic Services 1
ACCT 1
All Elected Members of North Ayrshire Council    33 
Police Scotland
Divisional Commander, Kilmarnock    1
Traffic Management, Ayr    1 
Strathclyde Partnership for Transport    1 
Scottish Fire & Rescue Service – Divisional Commander     1 
Scottish Ambulance Service    1 
MetDesk Limited    1 
Amey    1 
Ayrshire Roads Alliance     1   
Renfrewshire Council - Head of Roads    1 
East Renfrewshire Council – Head of Roads & Planning    1 
Inverclyde Council – Head of Transportation & Roads Service    1 
Contact Centre, Building Services, Stevenston    1 
Contact Centre, Bridgegate House, Irvine    1 
366

Page 367

25 | P a g e
Appendix J 
BRIDGES WITH WEIGHT OR HEIGHT RESTRICTIONS 
HEIGHT RESTRICTIONS 
Bridge Location Grid Reference Signed Height  
Metric Imperial
B714/50 : Dalry, Railway Bridge 229960  649702 3.8 12’ – 6”
B706/40 : Barrmill 236834  651392 4.0 13’ – 0”
B7047/10 : Meadowfoot Road, West Kilbride 220791  647032 4.6 15’ – 0”
C6/10 : West Balgray 235333  642491 3.9 12’ – 9”
C26/10 : South Kilruskin 220541  650473 4.4 14’ – 6”
C26/20 : North Kilruskin 220423  650868 5.0 16’ – 6”
U67/10 : Dubbs 228508  642006 3.0 9’ – 9”
U67(A78 280) : Todhill (Dubbs Road, under
A78, Kilwinning Bypass)
229175  642250 4.0 13’ – 0”
U67/30 : Nethermains 230059  642199 3.7 12’ – 0”
C56/30 : Moor Road 220639  652980 4.7 15’ – 6”
C67/20 : Tandelhill 238174  651683 4.4 14’ – 3”
C99/20 : Cockenzie 230694  646241 3.0 10’ – 0”
Unc.TG/230 : Garnock View, Glengarnock 231875  653191 3.8 12’ – 6”
Unc.TI/70 : Old Church Street, Irvine 213571  638800 4.0 13’ – 3” 
WEIGHT RESTRICTIONS 
Bridge Location Grid Reference Signed Weight 
B781/30 : West Kilbride, Dalry Road 221015  649062 7.5T
C129/20 : Floors, north of Kilmaurs 240866  641921 17T
C99/30 : Dusk Bridge, near Dalry 230599  646882 7.5T
Unc.TL/30 : Largs, May Street 220711  658602 7.5T
U16/10 : Dalgarven Mill Bridge, north of
Kilwinning, (formerly Unc.NC/30)
229571  645847 26T
U23 : Fairliecrevoch Bridge, Perceton, Irvine 236065  642011 3T
Unc.NT/10 : Barrmill 236472  650997 3T (Not Adopted)
U54/30 : Sevenacres Mill Bridge, Kilwinning 233123  643810 Currently being
replaced. 
367

Page 368

26 | P a g e
Appendix K 
ARRANGEMENTS WITH OTHER AUTHORITIES 
ROADS TO BE TREATED BY
ADJACENT AUTHORITIES 
ROADS TO BE TREATED BY
NORTH AYRSHIRE COUNCIL 
Ayrshire Roads Alliance (East
Ayrshire) 
A71 – from boundary westwards to
Corsehill roundabout. 
A735 – that section within North
Ayrshire boundary. 
B769 – from boundary south
westwards to Chapeltoun junction. 
C129 – that section within North
Ayrshire boundary. 
C20 – that section within North
Ayrshire boundary. 
B706 - from boundary to A736 
C117 From Chapeltoun Bridge to
Wheatrig Bridge 
South Ayrshire 
U107 from the South Ayrshire Council
boundary at the railway bridge to A759
Auchengate Interchange. 
East Ayrshire 
A736 – from Caldwell Bridge southwards to
Lugton. 
A736 – from B778 junction south
eastwards to Torranyard. 
C24 - from Greenhill Terrace, Knockentiber
to boundary at Plann Bridge. 
C126 From Montgreenan Bridge to North
Lodge. 
Knockentiber Road from boundary near
Springside to junction with C24 
Roads to be Treated by Ayrshire
Roads Alliance (South Ayrshire) 
B730 from the North Ayrshire Council
boundary at the railway bridge south of
Drybridge to junction Shewalton Road,
Drybridge. 
Renfrewshire Council 
A760 – from boundary to Kerse Road
junction, 
Kerse Road – from boundary to A760
junction 
Note:  There are no cross boundary arrangements with East Renfrewshire Council.
368

Page 369

27 | P a g e
Appendix L 
GRIT BIN POLICY & PROCEDURE 
1. North Ayrshire Council shall provide grit bins for self-help by members of the public.
These shall be sited locally in accordance with this policy. 
2. Grit bins shall only be located where the following criteria are met: - 
• The location is not on a precautionary carriageway route;
• The gradient is greater than 1 in 10, or at a junction with a known history of
accidents;
• The location shall not obstruct the passage of pedestrians, a minimum of 1.5m
clearance on the footway is required;
• The location shall not obstruct sight lines;
• The location is not within 200m of another grit bin location;
• The location is within an urban area;
• The location is within the boundary of the public road. Infrastructure and Design will
not provide grit bins in private areas or car parks for internal use by either the
Council or any other public or private property such as schools, parks, hospitals, old
people’s homes, etc. unless a service level agreement is in place. 
3. Grit bins will only be located where they can be filled from a lorry. The grit bins shall be
replenished at the start of the winter period and on a monthly cycle during the winter
period, as resources permit. 
4. Grit bins will generally be left in place during the summer months unless there is a
history of vandalism at a particular location. 
5. The location of grit bins will be recorded in an electronic database, which will be made
available on the North Ayrshire Council website. 
6. Only written requests on the Council’s Grit Bin Application Form will be considered,
these are available from the Head of Neighbourhood Services, Cunninghame House,
Irvine, KA12 8EE, and on the Council’s website. 
7. A request will not be accepted unless a location to site the grit bin has been agreed.
Therefore, even if the criterion for locating a grit bin is met, a grit bin will not be
provided if the adjacent residents cannot agree a position. The signed agreement of
adjacent residents must be included on the submitted application form, otherwise the
application will not be considered. 
8. Grit Bin Application forms are available on the Council’s website at 
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx 
369

Page 370

28 | P a g e
Appendix M 
Resilience Network 
370

Page 371

NORTH AYRSHIRE COUNCIL  
7 November 2023 
Cabinet
Title: Scottish Government Consultations on Burials and
Cremation 
Purpose: To seek approval of the proposed responses to the Scottish
Government consultations on Burials and Cremation. 
Recommendation: Cabinet is asked to approve the consultation responses from
North Ayrshire Council included at Appendix 1 and for these to
be submitted to the Scottish Government by 17 November 2023. 
1. Executive Summary 
1.1 On 25 August 2023, the Scottish Government launched a range of consultations on
proposed regulations to be made under the Burial and Cremation (Scotland) Act 2016. 
1.2 The four consultations relate to: 
• Burials
• Inspection of burial authorities, cremation authorities & funeral directors
• Alkaline Hydrolysis (water cremation)
• Licensing of funeral directors 
1.3 Responses have been drafted and Cabinet approval is being sought for responses to 3
of the 4 consultations.   
1.4 Approval of the draft response to the Burials consultation is sought due to changes in
policy in respect of burials including the restoration of lairs; approval of the response to
the consultation on inspection of burial authorities etc is being requested as North
Ayrshire Council is a burial authority and will be impacted by this; and approval of the
response drafted for the consultation on alkaline hydrolysis, as a new, evolving method
of body disposal is also being sought.   
1.5 The fourth consultation seeks views on the implementation of regulations for funeral
director licensing, which if implemented would create a licensing regime for funeral
directors with the Scottish Government being the Licensing Authority.  As this
consultation does not specifically impact North Ayrshire Council policies, a response
will be submitted by officers separately from an operational perspective to that
particular consultation.  
Agenda Item 14
371

Page 372

2. Background 
2.1 The Scottish Government developed, consulted on, and implemented the Burial and
Cremation (Scotland) Act 2016. The Act implemented recommendations made by the
Burial and Cremation Review Group, the Infant Cremation Commission, and the
National Cremation Investigation.   
2.2 The proposals set out in the consultations on burial, inspections and licensing are key
to realising the necessary detail, protection and processes envisaged by the Act. 
2.3 The consultation also aims to seek views on an alternative method to body disposal,
alkaline hydrolysis (water cremation) as responses to the 2016 Bill consultation
demonstrated there was public support for the introduction of new, environmentally
friendly alternatives in Scotland. This included alkaline hydrolysis which is already in
use in some countries including Ireland, Canada and the USA.   
2.4 The main points for each of the Consultations are as follows: 
Burials 
The Consultation includes management of burial grounds, applications process for
burials, exhumation, private burial and restoration of lairs. 
The sections in Part 1 of the Act relating to Burial have not yet commenced and this will
introduce a range of legal obligations for individuals and burial authorities. This will
include an end to the sale of lair rights in perpetuity. Rights of burial will be limited to a
25 year period with an option for the lair holder to apply to extend the rights for
subsequent periods of 10 years. 
One of the key issues addressed by the Act is the restoration of lairs as there is
increasing pressure on available and suitable land for burials in Scotland and the
restoration of unused and part used lairs. 
Inspection of burial authorities, cremation authorities and funeral directors 
The purpose of this consultation is to seek views on the implementation of regulations
for burial authorities, cremation authorities and funeral directors. A previous
consultation on the proposed regulations was carried out in 2017 and the funeral sector
was consulted with as part of the Inspection Regulations Working Group which was
convened in 2018. 
Licensing of funeral directors 
The purpose of this consultation is to seek views on the implementation regulations for
funeral director licensing, which if implemented would create a licensing regime for
funeral directors with the Scottish Government being the Licensing Authority.  As this
consultation does not specifically impact North Ayrshire Council policies, a response
will be submitted by officers separately from an operational perspective to that
particular consultation.  
372

Page 373

Alkaline Hydrolysis (Water cremation
The consultation proposal is that alkaline hydrolysis would be an additional choice for
people interested in exploring an alternative to traditional cremation. This is a matter of
choice for individuals and not a replacement for traditional methods, it’s an alternative.
Alkaline is a more environmentally friendly option than traditional cremation. 
The consultation also seeks views on potential codes of practice, guidance and
regulations. 
2.5 A draft response to the three consultations on burials, inspection of burial authorities
etc and alkaline hydrolysis is provided in Appendix 1. Should Cabinet approve the
responses, they will be submitted to the Scottish Government by 17 November 2023.
The fourth consultation seeks views on the implementation of regulations for funeral
director licensing, which if implemented would create a licensing regime for funeral
directors with the Scottish Government being the Licensing Authority.  As this
consultation does not specifically impact North Ayrshire Council policies, a response
will be submitted separately by officers, from an operational perspective, to that
particular consultation.
3. Proposals
3.1 Cabinet is asked to approve the proposed responses from North Ayrshire Council
included in Appendix 1 and for these to be submitted to the Scottish Government by 17
November 2023. 
4. Implications/Socio-economic Duty
Financial
4.1 None.
Human Resources
4.2 None.
Legal
4.3 The consultation relates to the Burial and Cremation (Scotland) Act 2016.
Equality/Socio-economic
4.4 None.
Climate Change and Carbon
4.5 The consultation to consider alkaline hydrolysis as an alternative to traditional
cremation is a more environmentally friendly option.
Key Priorities
4.6 None.
373

Page 374

Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 This is a national Scottish Government consultation launched on 25 August 2023 and is
due to close on 17 November 2023. The consultation is open to all citizens and
organisations. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Service (Neighbourhood
Services), on 01294 324570. 
Background Papers
0
374

Page 375

Respondent Information Form 
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/ 
Are you responding as an individual or an organisation?   
Individual 
Organisation 
Full name or organisation’s name
Phone number 
Address 
Postcode 
Email Address 
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing 
preference: 
Publish response with name 
Publish response only (without name) 
Do not publish response 
We will share your response internally with other Scottish Government policy teams
who may be addressing the issues you discuss. They may wish to contact you again
in the future, but we require your permission to do so. Are you content for Scottish
Government to contact you again in relation to this consultation exercise? 
Yes 
No 
Information for organisations: 
The option 'Publish response only (without name)’ is available for individual
respondents only. If this option is selected, the organisation name will still be
published. 
If you choose the option 'Do not publish response', your organisation name may still
be listed as having responded to the consultation in, for example, the analysis report.
North Ayrshire Council
01294 310000
KA12 8EE
Cunninghame House
Irvine
bereavementservices@north-ayrshire.gov.uk
375

Page 376

Question 1 – What do you think is an appropriate timeframe for burial
authorities to prepare for the changes to the sale of right of burial? 
3 months 
6 months 
12 months 
Another timeframe 
Please give reasons for your answer. 
Question 2 – Please provide any views you have on the proposed minimum
content of the management plan, including whether any suggested content
should be added to, or removed from, the plan. 
Question 3 – Who do you think should be able to inspect or view a
management plan on request? 
Inspectors
Scottish Government
Members of the public
Another burial authority 
Other parties
No one – internal document only 
Please give reasons for your answer. 
6 months is a reasonable timeframe to amend lair certificate templates,
terms and conditions of sale, updating public information and setting up
systems to highlight when burial rights are due to expire.
Procedures for dealing with an unexpected rise in number of burials
suggest would be held in a separate business continuity plan which can
be referenced in the management plan, as well as contingency
arrangements for disruption or loss of service.
Document would not contain any business sensitive information,
business continuity plans may contain such info which would be best held
in a separate document.
376

Page 377

Question 4 – What timeframe should burial authorities be given to put a
management plan in place after the regulations come into force? 
3 months 
6 months 
12 months 
Other 
Don’t know 
Please give reasons for your answer. 
Question 5 – Do you think that burial authorities should be required to review
the management plan annually? 
Yes - it sounds right 
No - it’s too often 
No - it’s not often enough 
Not sure 
Please give reasons for your answer. 
Question 6 – What is your view on the proposed list of powers (set out in the
bullet points above) to be granted to burial authorities to enable them to
manage and maintain their burial grounds to a safe standard? (Please refer to
paragraph 29 of the consultation document). 
It looks right 
It does not look right 
Some of these powers are unnecessary 
Some powers are missing 
Not sure 
Please give reasons for your answer and provide any further comment.
This is difficult to determine as will contain site specific information on
several sites, some authorities have in excess of 50 burial grounds to
manage.
An annual review ensures information is kept up to date.
377

Page 378

Question 7 – where a lair right-holder is ‘known’ (or at least some form of
contact details are held), and the danger is not imminent, do you think that
regulations should require a burial authority to notify the lair right-holder prior
to taking corrective action to a lair, headstone or memorial? 
Yes 
No 
Not sure 
Please give reasons for your answer. 
Question 8 – If you answered ‘yes’ to question 7, how long should the lair
right-holder be given to carry out necessary repairs to a headstone or
memorial before a burial authority takes corrective action to make the
memorial safe? 
1 month 
2 months 
3 months 
6 months 
Other 
Please give reasons for your answer. 
The right to remove any items placed without permission (eg benches,
planting) and to remove any items which may affect the maintenance or
future interments within the burial ground.
For corrective action to a lair – in some cases no, as this could include repairing sunken
lairs which would not be feasible to notify title holders prior to carrying this out, the title
holder does not own the lair, they own Right of Burial.  Other issues regarding the lair
could be notified to the title holder such as items left on the lair which are not permitted. 
With regards to the headstone – yes.  The headstone is the title holder’s property and
as such their responsibility to maintain.  Out of courtesy they should be advised of any
remedial action required to this in case they wish to take corrective action prior to the
authority having to.
This would depend on the condition of the memorial and how hazardous
it is, the authority may have to take immediate action on safety grounds.
378

Page 379

Question 9 – Where lair right-holders are unknown (contact details are
outdated), please provide views on the most appropriate way to publicise the
intention to carry out inspections and potential corrective action to make
headstones and memorials safe.   
Question 10 – In relation to Question 9, how long should burial authorities be
required to publicise their intentions, prior to taking corrective action? 
1 month 
2 months 
3 months 
6 months 
Other 
Don’t know 
Please explain you reason for choosing this timeframe. 
Question 11 – Please provide any views you have in relation to headstones or
other memorials requiring urgent attention. 
Question 12 – Please provide any comments you have on the proposed
training requirements and the keeping of training records for burial authority
staff.
Attempts should be made to contact the title holder via the last known
contact details held.
A month gives the title holder sufficient time to contact the authority if
they wish, to confirm if they will be arranging remedial works themselves.
Agree burial authorities require powers to take immediate action on an
unsafe headstone or memorial.
379

Page 380

Question 13 – Please share your views on the designation of parts of a burial
ground for different faiths. 
Question 14 – Please share your view on the proposed information to be
collected in the burial application forms. 
It looks right 
It does not look right 
Some of this is unnecessary information 
There is some information missing 
Not sure 
Please give reasons for your answer. 
Question 15 - Please indicate if you think anything may be missing from the
proposed accompanying documentation list, or should be removed from it.   
Agree accurate record of this should be held.
Agree with proposals to engage with local faith communities.
One single form rather than 7 should be used and the different type of
burial can be detailed on a section of the form.  Age of deceased should
be included in details of deceased.  
Application for burial of pregnancy loss by health authority or body – shared or
individual burial : this should still require a medical certificate of pregnancy loss
or a health authority/medical practitioner confirmation that the pregnancy has
ended to the burial authority.
Any for burial of body parts (or whole body following donation/examination)
should require a lair certificate if the interment is to be in an existing lair.
380

Page 381

Question 16 – Do you think that an application for the burial of ashes in a
burial ground should be accompanied by a cremation certificate, where
available? 
Yes  
No 
Not sure 
Please give a reason for your answer. 
Question 17 - Where a cremation certificate is not available, and it is not
possible to obtain a copy, do you think that an applicant should be able to
submit one of the following instead: 
• an extract copy of the cremation register entry or;
• a Certificate of Registration of Death (Form 14) or equivalent or; 
• an abbreviated copy of the full death entry made in The Statutory Register
of Deaths 
Yes  
No 
Not sure 
Please give a reason for your answer. 
Question 18 - Please share your view on the proposed information to be
collected in the burial register entries. 
It looks right 
It does not look right 
Some of this is unnecessary information 
There is some information missing 
Not sure 
Please give a reason for your answer.
It is reasonable to have the certificate if available, although to be
cremated the Form 14 will have been required, so not essential.
The crematorium should be able to issue a copy.
381

Page 382

Question 19 – What is your view on the proposed list of organisations that an
applicant should engage with to ensure they are complying with local
requirements? 
The list is complete 
The list is missing some organisations 
The list contains unnecessary organisations 
Not sure 
Please give a reason for your answer. 
Question 20 – Do you think an applicant should be required to submit
evidence, alongside the application, to demonstrate that the proposed burial
site is in line with third party agency and local authority rules and guidelines? 
Yes 
No 
Not sure 
Please give a reason for your answer. 
Question 21 – What is your view on the proposed information to be collected
in the private burial application form? 
Some of this is unnecessary information 
It looks right 
x There is some information missing 
Coffin/casket sizes should also be recorded for babies/pregnancy
loss/body parts
All relevant organisations have been detailed.
This ensures rules and guidelines have been followed.
382

Page 383

Not sure 
Please give a reason for your answer. 
Question 22 – what do you think is a reasonable time limit for local authorities
to give decisions on private burial applications? 
1 week 
2 weeks 
3 weeks 
1 month 
Other 
Not sure 
Please give a reason for your answer. 
Question 23 – Please share your views on the Scottish Government’s proposal
not to allow for an application for private burial to be made for a person who is
not yet deceased. 
Question 24 – Do you think private burial should be considered on a case-by-
case basis? 
Yes 
No – restrictions should be included in the regulations 
Not sure 
Age of deceased should also be recorded.
If the application is complete with all relevant checks carried out then this
would be a reasonable time period. 
Agree, there are too many factors that could change in between the time
of application and the person dying.
383

Page 384

Please give a reason for your answer. 
Question 25 – Do you think that regulations should give local authorities the
power to charge fees for their role in private burial applications? 
Yes 
No 
Not sure 
Question 26 – If you answered “yes” to question 25, what services should
local authorities be able to charge for in relation to private burial? 
Question 27 – What is your view on the proposed information to be collected
in the Register of Private Burial? 
It looks right 
It does not look right 
Some of this is unnecessary information 
There is some information missing 
Not sure 
Please give a reason for your answer. 
Although it would be good to have detail in the regulations there may be
too many varying factors to allow this.
A set fee which will cover processing and carrying out relevant checks on
the application, carrying out a feasibility study, updating private burial
register.
All relevant details are covered.
384

Page 385

Question 28 – Please provide any comments on an appropriate way to record
the precise location of the private burial site (e.g. coordinates or description).   
Question 29 – Please provide any views on the proposed appeal process for
private burial decisions made by local authorities. 
Question 30 – Where an application for exhumation from a burial ground is
made by a relative of the deceased who is also the lair right-holder but is not
the nearest relative, do you think the applicant should be required to obtain
written consent from the nearest relative(s) and any relatives of the deceased
who have the same degree of kinship as the applicant (e.g. the applicants
siblings)? 
Yes 
No 
Not sure 
Please give a reason for your answer. 
Question 31 – Where an application for exhumation is made by a nearest
relative of the deceased but they are not the lair right-holder, should that
relative be required to obtain the written consent of the lair right-holder and
any relatives of the deceased who have the same degree of kinship as the
applicant (e.g. the applicant’s siblings)? 
Yes
Co-ordinates and description, and if there is any marker in place.
The proposals are reasonable.
Consent from next of kin should always be sought in such a case.
385

Page 386

No 
Not sure 
Please give a reason for your answer. 
Question 32 - Where an application for exhumation from a burial ground is
made by a burial authority, from whom should written consent be obtained? 
Lair right-holder 
Nearest relatives 
Other 
Please give a reason for your answer. 
Question 33 – Please share any views you have on the proposed fast-tracked
exhumation procedures? 
Question 34 – Thinking about the proposed feasibility report factors set out
above, which do you think should be included in a feasibility study for
exhumation? 
A check of the condition of the coffin to determine feasibility to exhume 
Health and Safety Risk Assessment 
Archaeological assessment (by local authority archaeologist or HES) 
Consultation with the CWGC 
Other 
None of the above 
Yes, all relevant next of kin should be contacted for consent and the title
holder should be notified but their consent not required if the exhumation
is authorised.
Both should always be consulted and consent requested but depending
on the circumstances the exhumation may be authorised without
consent.
This is needed to reduce the distress caused to families where there is
no room for a further interment in the lair which is sometimes only
discovered 2 days before the interment is due to take place.
386

Page 387

Please provide any views on anything else you think should or should not be
included in a feasibility report. 
Question 35 – Do you think there should be a time limit for carrying out an
exhumation once authorisation has been given? 
Yes 
No 
Not sure 
Question 36 - If you answered yes to the previous question, what do you think
the time-limit should be? 
3 months 
6 months 
1 year 
2 years 
Other 
Please give a reason for your answer and provide any other comments. 
Question 37 – Should requests for exhumation of known burials on private
land be made to an Inspector of Burial, Cremation and Funeral Directors? 
Yes 
No 
Not sure 
Please give reasons for your answer and provide any further comment. 
Rather than a check of the condition of the coffin, a test dig should be
required to determine if the exhumation is feasible.  In most cases the
condition of the coffin will be poor however it is still possible to exhume
preserving the dignity of the deceased.  In all cases the remains and
coffin will be recoffined.  The report or application should detail exactly
where the exhumed remains are to be reburied or if they are to be
cremated.
Once authorised this is a sufficient time period to make arrangements
and carry out the disinterment.
387

Page 388

Question 38 – Where the person applying for exhumation from private land is
not related to the deceased (e.g. a new landowner) what arrangements should
be made for the exhumed remains? 
Question 39 – Please share any views you have on exhumation of discovered
human remains from outside a burial ground. 
Question 40 - What is your view on the proposed information to be collected
by each burial authority in the Register of Exhumation relating to the
exhumation of human remains carried out in a burial ground for which it is the
burial authority? 
It looks right 
It does not look right 
Some of this is unnecessary information 
There is some information missing 
Please give a reason for your answer. 
As there will be an application and record of all private burials it is right
and correct that any exhumations on private ground should also be
recorded and applied for.
A process to contact any remaining next of kin should be followed and
consultation with them on a new burial location should be discussed.  If
unable to trace any next of kin the applicant would require to pay for
Right of Burial for lair in a nearby cemetery.
Investigations in line with Police Scotland and any other relevant agency
should take place prior to the remains being authorised to be exhumed. 
Attempts where possible to contact next of kin should be made before
any reinterment is arranged.
Age of deceased, original date of burial should also be recorded.
388

Page 389

Question 41 - What is your view on the proposed information to be collected
by each local authority in the Register of Exhumation relating to the
exhumation of human remains authorised for private burial by that local
authority? 
It looks right 
It does not look right 
Some of this is unnecessary information 
There is some information missing 
Please give a reason for your answer. 
Question 42 – Do you think that no less than 6 months from the date the notice
is issued is an appropriate length of time for the lair right-holder to consent or
object to the restoration of a lair? 
Yes 
No – too long 
No – too short 
Not sure 
If you answered ‘no’, please suggest a minimum time period. 
Question 43 – Do you think that no longer than 12 months from the date the
notice is issued is an appropriate length of time for the lair right-holder to
consent or object to the restoration of a lair? 
Yes 
No – too long 
No – too short 
Not sure 
If you answered ‘no’, please suggest a maximum time period. 
Age of deceased, original date of burial should also be recorded. 
389

Page 390

Question 44 – Where the burial authority cannot identify the lair right-holder,
please provide your views on how a burial authority may publicise the
intention to restore the lair. 
Question 45 - What is your view on the proposed information to be collected in
the Register of Restored Lairs? 
It looks right 
It does not look right 
Some of this is unnecessary information 
There is some information missing 
Not sure 
Please give a reason for your answer. 
Question 46 – If the lair is to be used for a further burial and it is not possible
to return a headstone to its original position do you have any views on how it
should be preserved or retained? 
Public notices in local press, notices at burial ground and also at grave
location.
Address and age of deceased should be recorded (if known)
390

Page 391

Question 47 - Please provide any additional views or comments you may have
on any aspect of the proposed burial regulations.   
Question 48 - Do you have any views on the potential impacts of the proposals
in this consultation on human rights? 
Question 49 - Do you have any views on the potential impacts of the proposals
in this consultation on equalities and the protected characteristics set out
above? (Please refer to pages 47 – 48 of the consultation).
Question 50 - Do you have any views on the potential impacts of the proposals
in this consultation on children and young people as set out in the UN
Convention on the Rights of the Child?
Details on the condition of the headstone should be taken and it should
be photographed so that this is recorded before the headstone may be
removed or disposed of due to its condition.
No further comments
No further comments
No further comments
391

Page 392

Question 51 - Do you have any views on the potential impacts of the proposals
in this consultation on socio-economic inequality?
Question 52 - Do you have any views on potential impacts of the proposals in
this consultation on communities on the Scottish islands?
Question 53 - Do you have any views on the potential impacts of the proposals
in this  consultation on privacy and data protection?
Question 54 - Do you have any views on the potential impacts of the proposals
in this consultation on businesses and the third sector?
No further comments
No further comments
No further comments, island communities do not appear to be impacted
any differently.
No further comments
392

Page 393

Question 55 - Do you have any views on the potential impacts of the proposals
in
this
consultation on the environment?
No further comments
No further comments
393

Page 394

Respondent Information Form
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/
Are you responding as an individual or an organisation?
Individual 
Organisation
Full name or organisation’s name
Phone number
Address 
Postcode
Email Address
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing
preference:
Publish response with name
Publish response only (without name)
Do not publish response
We will share your response internally with other Scottish Government policy teams
who may be addressing the issues you discuss. They may wish to contact you again
in the future, but we require your permission to do so. Are you content for Scottish
Government to contact you again in relation to this consultation exercise?
Yes
No
Information for organisations:
The option 'Publish response only (without
name)’ is available for individual
respondents only. If this option is selected,
the organisation name will still be
published. 
If you choose the option 'Do not publish
response', your organisation name may still
be listed as having responded to the
consultation in, for example, the analysis
report.
North Ayrshire Council
01294 310000
KA12 8EE
Cunninghame House,
Irvine
394

Page 395

Question 1 - Please provide any comments on the Scottish Government’s
proposals related to types of inspections by inspectors.
Question 2 - Do you agree or disagree with taking a ‘risk-based approach’ to
determining the frequency of routine inspections for cremation authorities?
Strongly agree ☐
Agree ☒
Neither agree or disagree ☐
Disagree ☐
Strongly disagree ☐
Question 3 - Please provide any suggested revisions or additions to the
criteria proposed for determining the level of risk of cremation authorities.
Question 4 - Do you agree or disagree with taking a ‘risk-based approach’ to
determining the frequency of routine inspections for burial authorities?
Strongly agree ☐
Agree ☒
Neither agree or disagree ☐
Disagree ☐
Strongly disagree ☐
Question 5 - Please provide any suggested revisions or additions to the
criteria proposed for determining the level of risk of burial authorities.
Agree with the intention for both routine and ad-hoc inspections bearing in mind
operational and business needs at the time of the inspection.
Agree with the criteria stated
Agree with the criteria stated
395

Page 396

Question 6 - Do you agree or disagree with taking a ‘risk-based approach’ to
determining the frequency of routine inspections for funeral director
businesses?
Strongly agree ☐
Agree ☒
Neither agree or disagree ☐
Disagree ☐
Strongly disagree ☐
Question 7 - Please provide any suggested revisions or additions to the
criteria proposed for determining the level of risk of funeral directors.
Question 8 - Please provide any comments on the proposal to link inspections
and funeral director licence renewals. 
Question 9 - Please provide any other comments regarding the proposals for
determining the frequency of routine inspections.
Agree this makes sense to link the inspections and renewals where appropriate.
Agree with the criteria stated
No further comments
396

Page 397

Question 10 - Which option presented above do you prefer? (please refer to
paragraph 87 to 100)
Option A ☒
Option B ☐
Neither ☐
Don’t know ☐
Question 11 - If Option B is pursued by the Scottish Government, please select
the percentage of premises you think should be randomly selected for
inspection. 
25% of premises ☐
50% of premises ☐
75% of premises
Other % of premises (please state a %): ☐
Don’t know     ☐
Question 12 - Please provide reasons for your selection above, and any other
comments you wish to make.
Question 13 - Please provide any comments on the Scottish Government’s
proposals related to inspection of equipment and other items by inspectors.
Each premise is operating as a business and as such should be treated the same
as every other premise.  All premises should be up to standard at all times in any
case.  Only inspecting a selection of premises will result in a lack of confidence in
the business.  Larger organisations will have policies in place but there will be
local variations to this and local practices which will differ per office.
In agreement with list provided.
☐
X  100%
397

Page 398

Question 14 - Please provide any comments on the Scottish Government’s
proposal to provide in regulations powers for Inspectors to interview staff (or
third-party contractors) or clients of burial authorities, cremation authorities,
or funeral directors.
Question 15 - Please provide any views about the Scottish Government’s
revised proposal to not include in regulation powers for Inspectors to seize,
detain, or remove equipment from relevant bodies.
Question 16 - Do you agree or disagree that Inspectors should be able to issue
an enforcement notice which requires equipment to be repaired or replaced?
Strongly agree ☐
Agree ☒
Neither agree or disagree ☐
Disagree ☐
Strongly disagree ☐
Question 17 - Do you agree or disagree that Inspectors should be able to issue
an enforcement notice which prohibits a relevant body from using equipment
until it is repaired or replaced?
Strongly agree ☐
Agree ☒
Neither agree or disagree ☐
Disagree ☐
Strongly disagree ☐
Agree with the proposals, it is important that these discussions are had for points
of clarification.
Agree with proposal and that any equipment which poses serious risk should be
referred to the relevant body.
398

Page 399

Question 18 - Please provide any other comments about the use of
enforcement notices to require equipment repairs/replacements or prohibit
use of equipment.
Question 19 - Please provide your views about whether 14 days is an
appropriate timescale to require a response to the inspection report.
14 days is too long  ☐
14 days is appropriate ☐
14 days is too short  ☒
Don’t know  ☐
Question 20 - Please provide any other views about the proposed approach to
inspection reports. 
Question 21 - Please provide comments on the proposed content of
enforcement notices. 
The report may contain specialist information and a member of staff with the
relevant knowledge and qualifications may not be available for 14 days to
respond, we would suggest 21 days may be a more appropriate timescale.
Agree with proposed content.
No further comments
399

Page 400

Question 22 - Please provide comments on the proposed approach to lifting
enforcement notices.
Question 23 - Please provide any other comments on the Scottish
Government’s maintained proposal to provide in regulations power for
Inspectors to issue enforcement notices
Question 24 - Please provide any views on the proposed content of
suspension notices.
Question 25 - Please provide any views on the proposed process of issuing
suspension notices.
Agree with proposed approach.
Would propose that the enforcement notice should be emailed to the manager of
the premises with a follow up via registered post.
Agree with proposals.
Agree with proposals.
400

Page 401

Question 26 - Please provide any views on whether there should be an
opportunity for the authority to make an oral representation to Scottish
Ministers or a representative of Scottish Ministers before Ministers make their
decision whether to issue a suspension notice.
Question 27 - Please provide any views on the proposed process for lifting a
suspension notice.
Question 28 - Please provide any other views on the Scottish Government’s
proposals for suspension notices for burial authorities and cremation
authorities.
Question 29 - Please provide any views on the appeal process for decisions
made by Inspectors. 
Yes, it would be helpful for an opportunity for the authority to make oral
representation prior to a notice being issued.
Agree with proposals.
On most occasions it will be a funeral director contacting the burial or cremation
authority about their services, we expect the authority will be required to advise
them of the suspension notice and not just a member of the public who enquires.
Agree with the proposals.
401

Page 402

Question 30 - Please provide any views on the appeal process for decisions
made by Scottish Ministers.
Question 31 - Please provide any comments on the proposed approach to
complaints.
Question 32 - Please provide any additional views or comments you may have
on the proposed statutory inspection regime.  
Question 33 - Do you have any views on the potential impacts of the proposals
in this consultation on human rights? 
Agree with the proposals.
Agree with proposals.
No further comments
No further comments
402

Page 403

Question 34 - Do you have any views on the potential impacts of the proposals
in this consultation on equalities and the protected characteristics set out
above? (Please refer to page 48 of the consultation document).
Question 35 - Do you have any views on the potential impacts of the proposals
in this consultation on children and young people as set out in the UN
Convention on the Rights of the Child?
Question 36 - Do you have any views on the potential impacts of the proposals
in this consultation on socio-economic inequality?
Question 37 - Do you have any views on potential impacts of the proposals in
this consultation on communities on the Scottish islands?
No further comments
No further comments
No further comments
No further comments, island communities do not appear to be impacted any
differently.
403

Page 404

Question 38 - Do you have any views on the potential impacts of the proposals
in this consultation on privacy and data protection?
Question 39 - Do you have any views on the potential impacts of the proposals
in this consultation on businesses and the third sector?
Question 40 - Do you have any views on the potential impacts of the proposals
in this consultation on the environment?
No further comments
No further comments
No further comments
404

Page 405

Respondent Information Form
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/ 
Are you responding as an individual or an organisation?
Individual 
Organisation
Full name or organisation’s name
Phone number
Address 
Postcode 
Email Address
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing
preference:
Publish response with name
Publish response only (without name)
Do not publish response
We will share your response internally with other Scottish Government policy teams
who may be addressing the issues you discuss. They may wish to contact you again
in the future, but we require your permission to do so. Are you content for Scottish
Government to contact you again in relation to this consultation exercise?
Yes
No
Information for organisations:
The option 'Publish response only (without name)’ is available for individual
respondents only. If this option is selected, the organisation name will still be
published. 
If you choose the option 'Do not publish response', your organisation name may still
be listed as having responded to the consultation in, for example, the analysis report.
North Ayrshire Council
01294 310000
KA12 8EE
Cunninghame House
Irvine
bereavementservices@north-ayrshire.gov.uk
405

Page 406

Question 1 - Do you think that the Scottish Government should introduce
regulations to allow the use of alkaline hydrolysis as a method of disposal of
human remains in Scotland? Please also provide the reason for your answer.
(see para 3 – 7)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Question 2 - Have the sustainability claims made by manufacturers influenced
your response to Question 1? Please provide details. (see para 11)
Yes ☒
No
Don’t know
No view/ comment
Comments:
This will provide an increased choice and an alternative to more traditional methods of disposal.  It
is kinder to the environment than burial or traditional cremation and may ease pressure on burial
ground capacity for those that do not like the idea of a traditional cremation.
Increased choice is always good, however, if kinder to the environment then can only be a
positive move.
406

Page 407

Question 3 - Assuming that alkaline hydrolysis is to be allowed, should it be
regulated in a similar manner as cremation? (see para 22 – 23)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Question 4 - Do you agree that the same procedure as applies to opening new
crematoriums should apply to opening alkaline hydrolysis premises? (see
para 29)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Any type of disposal of human remains must be regulated and as a similar process in that the end
process results in ashes it seems appropriate to follow the cremation regulations as a basis.
This is appropriate.
407

Page 408

Question 5 - Should alkaline hydrolysis operators be subject to inspection in
the same way as cremation authorities? (see para 32)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Question 6 - What information do you think should be included in a
management plan by a provider of alkaline hydrolysis? (see para 33 – 37)
Comments:
Question 7 - Do you agree that there should be statutory application forms
similar to the cremation application forms? (see para 39)
Yes ☒
No
Don’t know
No view/ comment
Comments:
The detail proposed is appropriate.
It is appropriate and important that any operators involved in the disposal of human remains are
inspected and regulated.
408

Page 409

Question 8 - Do you have any views on the provision of alkaline hydrolysis for
children under age 4 and for stillborn babies (even though no ashes are likely
to result)? (see para 42 – 44)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Question 9 - Do you have any comments on extending the requirement for a
Form E1 (as applies when the body is released for cremation by COPFS) to
alkaline hydrolysis? (see para 45)
Yes ☒
No
Don’t know
No view/ comment
Comments:
This is appropriate in line with other methods of disposal of human remains and essential that
accurate records are kept.
Agree that if offered and chosen by parents of children aged under 4 and stillborn babies it must
be made clear to them there is unlikely to be any ashes recovered.
This is appropriate as the body will no longer be available for future examination.
409

Page 410

Question 10 - Do you agree that operators of alkaline hydrolysis (and funeral
directors) should be required to comply with the same requirements and
timescales for handling of the remains as they are for ashes following
cremation? (see para 47 – 48)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Question 11 - Do you agree that the content of the statutory cremation register
for bodies should be replicated for alkaline hydrolysis? Please add any
comments on what you think should be different and why. (see para 49)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Yes, this will prevent the historical issues with unclaimed ashes in line with the cremation
regulations.
No further comments
410

Page 411

Question 12 - Do you agree that the content of the statutory cremation register
for body parts should be replicated for alkaline hydrolysis? Please add any
comments on what you think should be different and why. (see para 49)
Yes ☒
No
Don’t know
No view/ comment
Comments:
Question 13 - Do you agree that the content of the statutory cremation register
for stillborn babies should be replicated for alkaline hydrolysis? Please add
any comments on what you think should be different and why. (see para 50 –
51)
Yes ☒
No
Don’t know
No view/ comment
Comments:
No further comments
No further comments
411

Page 412

Question 14 - Section 87 of the 2016 Act provides that where a person dies or
is found dead within a local authority area, and no arrangements are being
made for them to be buried or cremated, the local authority must make the
arrangements. In these cases, should the local authority be able to use
alkaline hydrolysis where it is available? Please provide reasons for your
answer. (see para 52)
Yes ☒
No
Don’t know
No view/comment
Comments:
Question 15 - As noted in the consultation, supporters of alkaline hydrolysis
have suggested that the liquid could be considered for sustainable disposal,
such as fertilizer. If relevant consents are obtained, do you have any views on
whether this should be an option? (see para 53 – 60)
Yes ☒
No
Don’t know
No view/ comment
Comments:
This provides another option for arrangements.
If relevant consents and environmental assessments are carried out this should be an option.
412

Page 413

Question 16 - Do you have any other comments on the regulation and use of
alkaline hydrolysis which you wish to share? (see para 53 – 60)
Comments:
Question 17 - Do you have any views on the potential impacts of the proposals
in this consultation on human rights? 
Question 18 - Do you have any views on the potential impacts of the proposals
in this consultation on equalities and the protected characteristics set out
above?
No further comments
No further comments
No further comments
413

Page 414

Question 19 - Do you have any views on the potential impacts of the proposals
in this consultation on children and young people as set out in the UN
Convention on the Rights of the Child?
Question 20 - Do you have any views on the potential impacts of the proposals
in this consultation on socio-economic inequality?
Question 21 - Do you have any views on potential impacts of the proposals in
this consultation on communities on the Scottish islands?
Question 22 - Do you have any views on the potential impacts of the proposals
in this consultation on privacy and data protection?
No further comments
No further comments
No further comments other than the availability of this service and that island
communities may have to travel further if they wish this type of service.
No further comments
414

Page 415

Question 23 - Do you have any views on the potential impacts of the proposals
in this consultation on businesses and the third sector?
Question 24 - Do you have any views on the potential impacts of the proposals
in this consultation on the environment?
No further comments
No further comments
415

Page 416

416

Page 417

NORTH AYRSHIRE COUNCIL 
07 November 2023 
Cabinet
Title: Strategic Housing Investment Plan 2024 – 2029
Purpose: To seek Cabinet approval of the Strategic Housing Investment   
Plan 2024 – 2029 
Recommendation: That Cabinet (i) approves the Strategic Housing Investment Plan
2024-2029 at Appendix 1 for submission to Scottish Government;
and (ii) gives delegated authority to the Executive Director
(Place) and the Cabinet Member for Green Environment and
Economy to liaise directly with the Scottish Government in
agreeing the North Ayrshire development programme and the
rescheduling of projects as required. 
1. Executive Summary 
1.1 The Strategic Housing Investment Plan (SHIP) 2024 - 2029 sets out the priorities and
locations for affordable housing investment by the Council and registered social
landlords in North Ayrshire over the next five years. The Strategic Housing Investment
Plan is based on projected Scottish Government grant funding of £124.000m for the
Council and its partner landlords from April 2023 to March 2029. 
1.2 The Council’s projects detailed within the plan represent Council investment of
£194.464m, supported by £78.070m of Scottish Government Grant. An estimated
additional £3.869m is required beyond the funding allocated in the latest HRA 30-year
Business Plan, supported by an estimated additional £0.461m in grant funding to
support the Council projects within the plan. This will be considered within the current
review of the HRA Business Plan, prior to it being presented to Council in February 2024
as part of the 2024-25 HRA budget and rent setting. 
1.3 It is proposed that delegated authority is assigned to the Executive Director (Place), in
consultation with the Cabinet Member for Green Environment and Economy, to liaise
with the Scottish Government and agree the rescheduling of projects detailed in the
Strategic Housing Investment Plan, as required. Any additional projects that are not
contained within the approved Strategic Housing Investment Plan will require further
Cabinet approval. 
1.4 The Strategic Housing Investment Plan 2023 – 2028, approved by Cabinet in November
2022, noted that the Council and its RSL partners would deliver 1,652 new affordable
homes by March 2028. A total of 274 new build homes and five buybacks were
completed during 2022/23 from the 1,652 five-year target. 
Agenda Item 15
417

Page 418

1.5 Cabinet also reaffirmed the Council’s own commitment to construct 1,625 new build
homes over the 15-year period from April 2013 to March 2028 and to buy back 30
homes through the Strategic Housing Investment Plan 2023 - 2028. To date the Council
has delivered 885 new build homes, with 740 homes still to be completed. The Council
acquired five homes through the 2023 - 2028 buyback scheme during 2022/23. 
1.6 The Council and its partners are experiencing significant affordability challenges due to
changes in the rate of inflation, higher than budgeted interest rates for borrowing and
increasing housing standards and specifications, compared to the level of grant funding
available to offset these pressures. For the second consecutive year, reflecting the
current issues with new build affordability, no new build sites have been nominated for
the Strategic Housing Investment Plan by either the Council or its registered social
landlord partners. 
1.7 In order to increase affordable housing supply despite the affordability challenges
outlined above, the draft Strategic Housing Investment Plan 2024 - 2029 proposes to
revise the cumulative Council new build target to 1,615 and utilise the funding previously
earmarked for 10 properties currently within the ‘unallocated regeneration block’ to
support the buyback of an additional 40 properties by 2028, increasing the total planned
over the next five years to 65 units. This proposal would result in increased affordable
housing stock overall and provide the opportunity to quickly acquire specific house types
and sizes to reflect applicants’ needs. 
1.8 Cunninghame Housing Association’s 27-unit scheme at Harbour Road has been
removed from the new plan due to affordability challenges. Cairn have included a two-
unit buyback programme and their ‘Confidential Site 1’ has increased by one unit. 
1.9 The Council and its registered social landlord partners will provide a total of 1,302 new
affordable homes across the six localities over the next five years. The house types to
be delivered in each locality are noted in table 1 below. The units noted as ‘TBA’ include
88 buybacks across four developing organisations, 107 unallocated units for
Cunninghame Housing Association (92 units) and the Council (15 units), and the 30-unit
regeneration programme proposed by Riverside. 
Table 1: New supply housing (including buy backs & refurbs) by locality & type
Locality Arran Garn
Vally Irvine Kilw North
Coast
Three
Towns TBA Sub
Total 
Total
All
Family NAC 0 36 283 5 3 71 75 473 791 Family RSL 32 0 22 4 0 149 111 318
Amenity NAC 0 19 169 2 12 31 3 236 311 Amenity RSL 0 0 2 0 0 47 26 75
Sheltered NAC 0 0 28 0 0 0 0 28 28 Sheltered RSL 0 0 0 0 0 0 0 0
W/chair NAC 0 9 115 0 0 26 2 152 172 W/chair RSL 0 0 2 0 0 10 8 20
Total All 32 64 621 11 15 334 225 1,302
Total NAC 0 64 595 7 15 128 80 889
Total RSL 32 0 26 4 0 206 145 413 
1.10 As noted above, the draft Strategic Housing Investment Plan 2024 - 2029 will secure
418

Page 419

investment in a total of 1,302 properties. The six active North Ayrshire social landlords
will provide sustainable, affordable, accessible, and high-quality homes which will
contribute to the wider regeneration aims for the area. This will in turn secure
employment and training opportunities for North Ayrshire businesses and residents and
support the Council’s Community Wealth Building Strategy. Members are invited to
approve the SHIP at Appendix 1 for submission to the Scottish Government, as the
Council’s investment plan for new affordable housing in the area over the next five
years. 
2. Background 
2.1 The Strategic Housing Investment Plan (SHIP) 2024 - 2029 sets out the priorities and
locations for affordable housing investment by the Council and registered social
landlords in North Ayrshire over the next five years to support the outcomes in the Local
Housing Strategy. It is prepared in accordance with Scottish Government guidance and
includes details of individual development projects to be taken forward over its lifespan
(see Appendix 1). 
2.2 The Strategic Housing Investment Plan 2023 – 2028, approved by Cabinet in November
2022, noted that the Council and its partners would deliver 1,652 new affordable homes
by March 2028. A total of 274 new build homes and five buybacks were completed
during 2022/23 from the 1,652 five-year target. 
2.3 Cabinet also reaffirmed the Council’s own commitment to construct 1,625 new build
homes over the 15-year period from April 2013 to March 2028 and to buy back 30
homes through the Strategic Housing Investment Plan 2023 - 2028. To date the Council
has delivered 885 new build homes, with 740 homes still to be completed. The Council
acquired five homes through the 2023 - 2028 buyback scheme during 2022/23. 
2.4 The Council and our partners have delivered 1,665 new build homes since April 2013;
this is detailed by locality and house type in table 2 and chart 1 below. Please note that
completed Council developments are included for sites which reached practical
completion from April 2013 to March 2023. 
Table 2: Completed new build developments by type and locality from April 2013
Locality Arran Garnock
Valley Irvine Kilwinn North
Coast
Three
Towns
Sub
Total 
Total
All
Family NAC 17 0 123 71 77 6 294 934 Family RSL 50 0 177 137 66 210 640
Amenity NAC 8 16 37 5 52 2 120 283 Amenity RSL 0 0 70 13 45 35 163
Shelt NAC 0 38 40 24 57 64 223 223 Shelt RSL 0 0 0 0 0 0 0
W/chair NAC 9 0 46 14 15 6 90 130* W/chair RSL 0 0 8 8 4 20 40
Support NAC 0 15 0 10 22 15 62 78 NSSE RSL 6 0 10 0 0 0 16
Other NAC 0 4 0 1 1 1 7 17 Other ad RSL 0 0 10 0 0 0 10
Total All 90 73 521 283 339 359 1,665
Total NAC 34 73 246 125 224 94 796
Total RSL 56 0 275 158 115 265 869
*It should be noted that 50 of the amenity, sheltered and supported accommodation
homes are suitable for wheelchair users.
419

Page 420

2.5 The Council and its registered social landlord partners have experienced significant
affordability challenges and pressures in delivering our new build programmes. The rate
of inflation and rising material costs have significantly impacted upon construction costs
and project viability. 
2.6 In the Housing Revenue Account budget approved at the Council meeting in February
2023, the Council increased the programme budget by £32.762m, with an assumption of
an additional £13.944m of grant funding to be able to retain the existing committed
development programme. This was required to offset rising rates of inflation and ensure
that the costs associated with the introduction of new legislation relating to installation of
zero direct emissions heating systems and electrical vehicle charging points could be
met. The Council also included provision to enhance the building fabric for all new
homes to reduce the need for heating and address fuel poverty. 
2.7 The Scottish Government published revised grant funding benchmark rates in June 2023
and, whilst funding is available to offset some of the costs of installing zero direct
emissions heating systems, fire suppression systems and electrical vehicle charge
points, this is considerably less than anticipated installation costs.   
2.8 The impact of the increased benchmark grant subsidy levels has been reviewed for the
Council projects detailed within the Strategic Housing Investment Plan 2018 - 2023
against the £13.944m grant funding requirement estimate noted to Council in February
2023. The new benchmark grants are a total of £0.463m less than the Council’s
67
300
208
143
216
8
16
107
18
97
37
38
40
24
57 64
15
10
22 15
9
64
22
19 26
4
1
1
1
6
10
0
0
100
200
300
400
500
600
Arran Garnock Valley Irvine Kilwinning North Coast Three Towns
Chart 1: New build development by house type and locality
General Needs Amenity Sheltered
Supported Wheelchair / adapted Other
New Supply Shared Equity
420

Page 421

assumptions (a shortfall of around £624 per unit impacted). In accordance with Scottish
Government guidance, the Council will seek grant funding above benchmark levels to
offset any funding shortfall, on a site-by-site basis, as required. 
2.9 Increasing standards and emerging legislation have further impacted upon project costs
and timelines, as options appraisals and financial modelling have been required. For
example, the cost to tenants, and future maintenance and replacement costs of zero
direct emissions systems, have been reviewed with solutions considered on a site-by-
site basis to ensure that they are both affordable to install, and for tenants to utilise. 
2.10 Technical guidance published in June 2023, which sets out Building Standards
requirements to provide electrical vehicle charging points, and revised roads design
guidance for increased parking prevision for new build housing, have resulted in design
revisions to existing plans and additional costs.   
2.11 The Scottish Government is currently undertaking revisions to their Housing for Varying
Needs standard, and further changes to building standards are planned to enhance the
accessibility and adaptability of housing stock. These changes are likely to impact upon
the Council’s standard house types and construction costs, resulting in programme
delays and increased costs.  Many of the design amendments have cost implications,
future maintenance implications, require additional floor space, increase overall built
areas, and reduce site capacity. Council officers from Property Management and
Investment, Housing Services and Building Standards are currently reviewing the
proposals and preparing a response to the consultation which closes on 21 December
2023.   
2.12 The provision of new build housing has many benefits, including contributing to the
regeneration of the area, developing sustainable housing solutions which help to
address fuel poverty, and supporting educational attainment. It can also support the
ageing population, people who require accessible housing, and people with particular
needs, to live more independently. 
2.13 The above benefits often come at a financial cost: 
• regeneration schemes often cost more as sites require demolition, refurbishment or
have significant constraints/ abnormal costs.
• sustainable heating systems and other technology are currently more expensive to
install, replace and maintain.
• accessible, amenity and particular needs housing is often more expensive as it
requires a larger floor footprint, increasing construction costs and reduces economies
of scale. 
2.14 Cost-of-living rent controls introduced by Scottish Government in 2022 limit landlords’
capacity to increase income to finance borrowing for capital investment, further
compounding affordability pressures. This issue is particularly acute for our local
registered social landlord partners, who are facing extreme pressure as they do not have
the borrowing options or economies of scale the Council benefits from. Their individual
new build projects are generally supported by grant funding and borrowing, offset
against projected rental income for that site. 
2.15 As reported to Cabinet on 1 November 2022, due to past successes in accelerating
projects and claiming additional funding year upon year alongside slippage in some
421

Page 422

projects, North Ayrshire was unable to claim the resource planning assumption for the
2022/23 financial year. The Council claimed an estimated total of £4.302m against the
resource planning assumption of £15.692m for the year (this value will be confirmed
when the Scottish Government out-turn report is published later this year). 
2.16 The Council and its partners claimed an additional £19.165m towards affordable housing
in the area from slippage in other local authority areas in the six years from April 2016 to
March 2022. Table 3 below illustrates the resource planning assumption, spend per
annum and total variance (over- or under-claim) from April 2016 to March 2023. This
demonstrates a cumulative over-claim of £7.775m against the resource planning
assumption for the period. The total number of new build units reaching practical
completion within each financial year is also noted in table 3. 
Table 3: Spend versus resource planning assumption per annum (£m) 
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 Total 
Resource
planning
assumption
£9.106 £10.160 £14.165 £16.112 £17.093 £18.205 £15.692 £100.533
Actual /
estimated
spend
£13.464 £14.210 £15.630 £18.658 £21.403 £20.641 £4.302* £108.308
Variance £4.358 £4.050 £1.465 £2.546 £4.310 £2.436 -£11.390 £7.775
Completed
units per
annum
35 119 216 169 77 329 230 1,175 
2.17 The variance for 2022/23 reflects Cunninghame Housing Association’s acceleration of
their West Byrehill project, which meant the grant was able to be claimed in 2021/22.
The Association also had grant allocated for Harbour Road, Irvine which was not
progressed. Riverside Housing had an unclaimed allocation for Bank Street and ANCHO
had an unclaimed allocation for confidential site 1. Programme slippage was also
experienced at the Council’s James McFarlane, James Reid, Stanecastle, Garnock
Academy, Montgomerie Park, and Ayrshire Central sites whilst the impact of zero direct
emissions heating systems and other legislative changes were assessed. 
2.18 It is currently estimated that North Ayrshire will be able to claim £9.793m of the
£15.648m Resource Planning Assumptions for the 2023/24 financial year. Discussions
are ongoing with the Scottish Government to ensure that grant funding is maximised
wherever possible. Slippage is anticipated at a number of Council developments due to
redesign works required as a result of regulatory changes and assessment of zero direct
emissions heating systems options. 
2.19 The Council’s Garnock Academy and King’s Arms sites have experienced procurement
delays. Cunninghame Housing Association’s Sharphill Phase 5 was expected to
commence in spring 2023 and had a £5.246m grant allocation for 2023/24. The project
has been delayed due to financial challenges and a requirement for site redesign; it is
now expected to commence during autumn 2027. 
2.20 The Strategic Housing Investment Plan is based on total projected Scottish Government
grant funding provision of £124.000m for the Council and its registered social landlord
partners from April 2023 to March 2029, illustrated in table 4 below. In accordance with
Scottish Government guidance, the Council has over-committed the funding within the
422

Page 423

Strategic Housing Investment Plan by approximately 25% to ensure that the full grant
allocation is spent, and to provide the opportunity for North Ayrshire to absorb slippage
from other local authority areas. For this reason, a significant portion of the funding is
allocated during April 2024 and March 2027 - see table 4 below. 
2.21 The Scottish Government has committed to providing North Ayrshire Council and its
registered social landlord partners with grant funding of £47.313m from April 2023 to
March 2026. The funding levels beyond March 2026 are not currently known and have
therefore been estimated, for planning purposes, based on the level of grant required to
deliver the programme. 
Table 4: Estimated spend versus resource planning assumption per annum (£m) 
2023/24 2024/25 2056/26 2026/27 2027/28 2028/29 Total
(£m)
Resource
planning
assumption
£15.648 £15.702 £15.963 £23.500 £25.500 £27.687 £124.000
Estimated
spend £9.793 £23.152 £30.972 £31.625 £19.946 £8.512 £124.000
Variance -£5.855 £7.450 £15.009 £8.125 -£5.554 -£19.175 £0.000 
2.22 The Scottish Government benchmark grant rates are subject to annual inflation in line
with the Scottish Social Housing Tender Price Index. For new build Council
developments, funding levels have been estimated for projects not yet at tender stage at
benchmark rates plus annual inflation, which has been assumed at 3.7% for 2024/25.
The Council will seek grant funding above these levels in accordance with Scottish
Government guidance on a site-by-site basis, as required. The registered social landlord
funding rates have been included as requested by each developing organisation and will
be subject to Scottish Government authorisation. 
2.23 It should be noted that, as and when the government uplifts the grant benchmark rates,
the capacity of the total Resource Planning Assumption (which has been treated as
fixed) will be reduced, as less units can be delivered within the overall funding available. 
2.24 For any projects noted within the Strategic Housing Investment Plan, Cabinet is asked to
delegate authority to the Executive Director (Place), in consultation with the Cabinet
Member for Green Environment and Economy, to liaise with the Scottish Government
and agree the rescheduling of projects as required. This is of particular importance
where deliverability is delayed due to emerging constraints and challenges that require
to be addressed. Spending on any additional projects that are not contained within the
Strategic Housing Investment Plan will require Cabinet approval. 
Key Achievements from 2022/23 
2.25 The Council’s first Arran development in a generation concluded in June 2022, providing
34 new homes which were allocated utilising the new Arran Local Lettings Initiative. The
79-unit St. Michael’s Wynd, Kilwinning site completed in September 2022. The site
delivered a new sheltered housing complex, supported accommodation, amenity
bungalows, general needs properties and homes suitable for wheelchair users. The 29
new sheltered homes at St. Colm’s Place also reached completion during September
2022. At Caley Court, Stevenston, 16 new supported accommodation bungalows
reached completion during January 2023. 
423

Page 424

2.26 Cunninghame Housing Association’s 72 new homes at West Byrehill, Kilwinning reached
completion in March 2023. 
2.27 During the current financial year, the Council’s 71 new units at Irvine Harbourside
completed during April 2023; the site includes a sheltered housing complex, amenity
bungalows, general needs properties and homes suitable for wheelchair users. Work
concluded to provide six new amenity bungalows at Afton Court, Stevenston during July
2023. Work also completed during September 2023 at the former Largs Police Station,
providing 12 new town centre amenity flats. 
2.28 Riverside Scotland’s 77 new homes at Tarryholme Phase 2, Irvine reached practical
completion during May 2023. Cunninghame Housing Association’s 24 amenity homes at
Green Street, Saltcoats completed in August 2023. 
Preparing the Strategic Housing Investment Plan 2024 - 2029 
2.29 The Council invited site nominations from its partners for the SHIP 2024 - 2029. For the
second consecutive year and reflecting the current issues with new build affordability, no
new build sites were nominated for the SHIP. 
2.30 Each North Ayrshire developing landlord partner now has a buyback programme,
demonstrating the challenges facing all organisations to develop new build homes
compared to the more affordable option of buying existing homes on the open market
and bringing them up to the appropriate housing standard. Some sites have been
anonymised for reasons of commercial sensitivity, or as they require further work to
ensure that they comply with the Council’s Planning or Roads policies. 
New Council projects 2024 - 2029 
2.31 The Council does not currently have the financial capacity to add any further new build
development into the Strategic Housing Investment Plan beyond the commitments
already made, due to increasing capital and maintenance costs, and the resultant impact
on the Housing Revenue Account 30-year business plan, and in turn upon tenant rent
levels. 
2.32 In order to increase affordable housing supply, the draft Strategic Housing Investment
Plan 2024 - 2029 therefore proposes to revise the cumulative target of 1,625 new build
Council homes to 1,615 units and utilise the funding allocated for 10 properties currently
assigned to the unallocated regeneration block to deliver an additional 40 buybacks by
March 2028 (increasing the total to 65 buyback units). This proposal would result in an
additional 30 houses available for social rent, compared to the previously approved SHIP
target. 
2.33 The increasing disparity between increasing new build costs and grant benchmark levels
is significantly impacting upon project affordability. Should benchmark grant funding
levels be increased or additional funding be made available during 2023/24 to address
the current affordability gap, the Council will review its commitments within the Strategic
Housing Investment Plan 2024 – 2029 and consider any opportunity to extend the new
build and buyback plans. 
New registered social landlord projects 2024 – 2029 
424

Page 425

2.34 Cairn/ ANCHO have included a 2-unit buyback programme within the new plan. 
Removal of Projects from the SHIP 2024 - 2029 
2.35 Cunninghame Housing Association’s 27 new homes proposed at Harbour Road, Irvine
have been removed from the plan as a viable scheme could not be developed. 
Amendments to the SHIP 
2.36 The following amendments have been made in this update of the Strategic Housing
Investment Plan: 
• Cairn’s confidential site 1 has increased to 10 units, from nine units previously noted,
following initial site design works
• Confidential Site 4 will be named as Springbank, Arran in the new plan
• Cunninghame Housing Association’s phase five site at Sharphill, Saltcoats will now
commence during autumn/ winter 2027, delayed from March 2023
• The Council’s unallocated regeneration block has reduced from 30 units to 15 units,
with 10 units removed to fund 40 new buybacks, and five units allocated to the
Grange Court, Stevenston estate-based regeneration project which has now been
named within the plan.
• Regeneration project 1e has been named as Nursery Place, Ardrossan, estate-based
regeneration scheme, which has reduced from seven units to six units; the balance of
one unit has been allocated to Grange Court, Stevenston. 
2.37 It should also be noted that financial viability assessments are still ongoing for Link’s
Parkend Gardens, Saltcoats site and the Council’s Refurbishment Project 8 in Irvine. 
2.38 If any project becomes delayed or non-viable, the Council will work with registered social
landlord partners and the Scottish Government to ensure that new homes are delivered,
and the available grant funding spent, by accelerating other projects. 
2.39 In terms of ongoing governance, senior officers monitor the progress of the new build
programme monthly through the Strategic Housing Investment Plan project board. 
2.40 The Council and its registered social landlord partners will provide a total of 1,302 new
affordable homes across the six localities in the draft plan. The house types to be
delivered by locality is noted in table 5 below. The 225 units noted as ‘TBA’ include 88
buybacks across five developing organisations; the 107 unallocated units for
Cunninghame Housing Association (92 units) and the Council (15 units); and the 30-unit
regeneration programme proposed by Riverside. 
Table 5: New supply housing (including buy backs & refurbs) by locality & type
Locality Arran Garnock
Valley Irvine Kilwinning North
Coast
Three
Towns TBA Sub
Total 
Total
All
Family
NAC 0 36 283 5 3 71 75 473
791 Family
RSL 32 0 22 4 0 149 111 318
Amenity
NAC 0 19 169 2 12 31 3 236
311 Amenity
RSL 0 0 2 0 0 47 26 75
425

Page 426

Sheltered
NAC 0 0 28 0 0 0 0 28
28 Sheltered
RSL 0 0 0 0 0 0 0 0
W/chair
NAC 0 9 115 0 0 26 2 152
172 W/chair
RSL 0 0 2 0 0 10 8 20
Total All 32 64 621 11 15 334 225 1,302
Total
NAC 0 64 595 7 15 128 80 889
Total RSL 32 0 26 4 0 206 145 413 
2.41 The Council and its registered social landlord partners completed and planned
developments are noted by locality in table 6 below. 
Table 6: Completed and planned development
Units Arran Garnock
Valley Irvine Kilwinning North
coast
Three
Towns TBA Total
Complete 90 73 521 283 339 359 0 1,665
Planned 32* 64 621 11 15 334 225 1,302
Total 122* 137 1,142 294 354 693 224 2,967
*It should be noted that, in addition to the above RSL and NAC plans, Arran Development
Trust are currently developing 18 new homes in Lamlash, Arran. 
Strategic Priorities 
2.42 The Strategic Housing Investment Plan is based on a series of guiding principles for
housing provision, taken from the new Local Housing Strategy 2023 - 2028. The strategy
mirrors the format of the Scottish Government’s Housing to 2040 strategy and sets out
four overarching outcomes: 
• More homes at the heart of great places
• Affordability and choice
• Affordable warmth and zero emission homes
• Improving the quality of all homes 
Children’s rights and wellbeing 
2.43 The North Ayrshire Child Poverty Action Plan 2022-2023 notes that North Ayrshire has
the second highest level of child poverty after housing costs of any area in Scotland.
Access to good quality and affordable housing is a key asset in addressing child poverty,
and poverty overall. All new build Council family homes have study space and private
gardens. 
2.44 The Council is also considering ways in which young people can access construction
related learning and training opportunities. The North Ayrshire Local Employability
Partnership Delivery Plan 2022 – 2026 sets out the intentions to help people of all ages
to gain skills for employment. It seeks to prepare people for employment, training,
education and / or volunteering, with the aim of increasing qualification levels and job
426

Page 427

prospects as well as reducing unemployment. Officers from Housing and Property
Management and Investment will work with Education colleagues to determine how the
housebuilding programme can support the Council’s ambitions to encourage more young
people into training and employment. 
More homes at the heart of great places 
20-minute neighbourhoods 
2.45 The provision of housing within 20-minute neighbourhoods allows people to meet their
needs locally and encourages active travel. Social housing projects which support the
principles of 20-minute neighbourhoods, where feasible, will be prioritised. 
Regeneration 
2.46 The Council, along with its strategic partners, continues to explore the site and area
specific opportunities to secure maximum regeneration benefits, supporting the
ambitions of the Council’s Regeneration Delivery Plan to drive forward development on
strategic regeneration sites, including town centres. 
2.47 Town centres continue to be of strategic importance as the economic and social focus
points of North Ayrshire. The Council acquired the former King’s Arms public house in
Irvine Town Centre in April 2020 and will redevelop the site into six amenity flats to
address local housing need and encourage town centre living. The redevelopment of the
site of the former Irvine high flats will also support town centre regeneration. 
2.48 The Council has already completed other town centre projects including: the
redevelopment of the former Largs Police Station and adjacent former St Colm’s Place
sheltered housing complex; the development of the former Springvale depot in Saltcoats;
and the redevelopment of former sheltered housing complexes at Afton Court and Caley
Court in Stevenston. 
2.49 Grange Court, Stevenston and Nursery Place, Ardrossan (formerly Regeneration Project
1e) have been named as estate-based regeneration projects within the new plan. 
2.50 The Strategic Housing Investment Plan includes the provision of funding for 250 units to
assist the delivery of Housing’s estate-based regeneration programme (it is proposed
that this is now reduced to 240 units to provide the 40 new buybacks detailed at 1.7 and
2.30 above). Most of this investment has now been allocated to support replacement
units following selective demolition of stock. The remaining 15 regeneration units
included within the plan will allow Housing Services to continue the implementation of
the estate-based regeneration programme, as well as support a review of assets in
relation to EESSH2 and zero emissions targets to consider further redevelopment
opportunities. 
Green Space 
2.51 Research shows that where people have access to good quality, outdoor green space,
there is a corresponding positive and lasting impact on public health. The Strategic
Housing Investment Plan will prioritise new social housing developments which include
the provision of outdoor green space for residents. 
427

Page 428

Island communities 
2.52 On Arran, the Council’s development of 34 units at Brathwic Terrace, Brodick completed
during June 2022 and a Local Lettings Initiative was introduced to give additional priority
to island residents and key workers. Trust Housing Association is currently in discussion
with a local landowner to develop 26 new homes in Brodick. Arran Development Trust
secured funding from the Rural and Island Housing Fund to deliver 18 new affordable
homes in Lamlash, with works currently underway. These developments, alongside work
with communities on the island, are anticipated to stimulate investment in other
infrastructure (transport, marine, digital) to encourage economic growth. 
2.53 The Council has established the Arran Housing Task Force to quantify the demand for
affordable housing on Arran and identify issues that may be limiting economic growth. A
quantitative study is currently being undertaken by North Star Consulting and Research
to determine affordable housing demand on the island, recognising the assessed
housing demand information from the North Ayrshire Housing Register and community
feedback. The Task Force membership includes elected members, the Scottish
Government, local community groups and Arran registered social landlords. The group is
currently developing an action plan to address any identified housing issues on the
island. 
2.54 18 new homes have recently been completed on Cumbrae through the Strategic
Housing Investment Plan as part of a second phase of the successful St Beya Gardens
site. 
2.55 It is hoped that the developments will help to address local housing need, support key
employment, and enable people to remain on the islands and protect their future. 
Affordability and choice 
Housing demand 
2.56 Demand figures have been obtained from the North Ayrshire Housing Register. House
size and type priorities have also been informed by the housing register. The Local
Housing Strategy has set a target of 1,625 new social housing units to be delivered by all
landlords by March 2028. 
2.57 Figure 1 plots Strategic Housing Investment Plan completions against the net stock gain.
The 'net gain' column indicates the additional homes available per locality following
completion of the developments, minus the strategic demolitions set out in the plan. It
also illustrates proportionate demand from the housing register as at 31 March 2023 and
historic new build completions from April 2013 to March 2023. Please note that
proportionate demand is indicative to illustrate trends; the actual demand figures will be
less as transfer applicants who are included in these figures will leave an existing
tenancy behind when they are allocated a new home. 
428

Page 429

Figure 1: Completions, net gain, proportionate demand and historic completions 
2.58 The Council allocates funding to each developing organisation from the available Scottish
Government Resource Planning Assumption (RPA). Figures 2 and 3 show the proportion
of stock held by each developing organisation, and the share of units per developing
organisation. 
Figure 2: Proportion of North Ayrshire stock held per developing organisation (%) 
NAC, 72%
CHA, 13%
Riverside (IHA), 10%
Cairn (ANCHO), 4% Trust, 1% Link, 0%
NAC CHA Riverside (IHA) Cairn (ANCHO) Trust Link
429

Page 430

Figure 3: Proportion of units per developing organisation (%) 
Gypsy / travellers 
2.59 No demand issues have been identified in relation to accommodation for gypsy/
travellers.  Following consultation with current tenants at Redburn Grove, Irvine in April
2023, future improvement proposals for the site are being developed and costed,
reflecting feedback gathered in relation to their preferences for future housing. A
business case is being developed which will include all available funding streams and a
full options appraisal for the site, including the potential to transfer the site from the
General Fund to the Housing Revenue Account. 
Ensuring best value 
2.60 The Council has developed standard house types and material specifications, alongside
a range of procurement methods to ensure best value from the development
programme. Increasing material costs, and costs to maintain new technologies included
as a result of emerging legislation, have been modelled to ensure that schemes are
affordable to both develop and maintain in the longer term. 
Innovation 
2.61 The Council has utilised off site construction on suitable schemes, which has reduced
time on site, minimised disruption for communities, and provided sustainability benefits. 
2.62 The recently completed Afton Court, Stevenston development utilised this construction
method, which reduced the time on site and reduced disruption to local residents and
businesses. For similar reasons, the Council is currently procuring an off-site
construction design and build contractor for the Newhouse Drive, Kilbirnie and Laburnum
Avenue, Beith sites, which are located within existing housing estates. 
2.63 The Council has a track record of testing and implementing zero direct emissions heating
systems, sprinkler systems and electrical vehicle infrastructure in advance of legislative
changes. This proactive approach helps us to identify affordability and maintenance
challenges at an early stage. 
2.64 The Council will continue to explore opportunities for innovation throughout the lifespan
of the SHIP 2024 - 2029. 
Rent levels and affordability 
NAC, 68%
CHA, 24%
Riverside (IHA), 3%
Cairn (ANCHO), 1% Trust, 3%
Link, 1%
430

Page 431

2.65 Many tenants in social housing are partly or fully dependent on benefits and are under
increasing pressure from the impacts of Welfare Reform and rising living costs. The
Scottish Housing Regulator expects social landlords to recognise tenants’ affordability
challenges and keep rent increases to a minimum. North Ayrshire Council has an
approved rent structure based on house size and type (house vs flat), with no additional
charge for new build properties. 
2.66 The Council is committed to ensuring rent levels are affordable, however the cost of
implementing regulatory changes and inflation is putting pressure on rent levels. The
Council has a fairly flat rent structure, with 12 rates applicable across the entire stock.
Local registered social landlords’ rents, in contrast, are higher and are generally
established on a site-by-site basis, with a business case prepared for each scheme and
impacts of the construction industry, inflation and regulation placing further pressure on
maintaining affordable rent levels. 
Empty homes and second-hand buybacks 
2.67 The Council and its partners recognise that bringing primarily former social housing stock
back into ownership can assist with housing management and maintenance issues and
increase housing supply available through the North Ayrshire Housing Register. It also
supports the Council’s Regeneration Delivery Plan and contributes to bringing long-term
empty homes back into use. All developing registered social landlord partners with stock
in North Ayrshire now have provision for buyback programmes within the Strategic
Housing Investment Plan. 
2.68 As set out at points 1.7, 2.30 and 2.50 above, the number of planned Council buybacks
has been increased from 25 to 65 in the SHIP 2024 - 2029. Should extra grant funding
from the Scottish Government become available throughout the year, the Council and
partner RSLs will revisit the commitment for the wider programme. 
Refugee resettlement programme 
2.69 The Council has responded positively to the humanitarian crisis created as a result of the
conflict in Ukraine. Since March 2022, the Council and partners have supported more
than 185 Ukrainian displaced households (395 people) to settle in North Ayrshire. We
have utilised 110 social rented properties for people fleeing the conflict. 
2.70 On 1 November 2022, Cabinet approved the refurbishment of 30 homes at Glebe Place,
Saltcoats which were previously scheduled for demolition. The project was fully funded
by the Scottish Government and the homes are currently being used to accommodate
Ukrainian individuals/ couples for a period of up to three years.  The demolition/
redevelopment project has been reprofiled within the SHIP to 2027/28, therefore
maintaining the overall SHIP commitment. 
Affordable warmth and zero emissions 
Sustainability 
2.71 Council officers are seeking to maximise the incorporation of energy efficiency measures
and renewable technologies within the new build programme. The developments within
the Strategic Housing Investment Plan will benefit from a range of sustainable measures:
for example, solar photovoltaic panels; air source heat pumps; and passive design
measures to minimise space heating demand. The exact package of measures will be
431

Page 432

determined through assessment of opportunities on a site-by-site basis. 
Improving the quality of our homes 
Specialist Accommodation 
2.72 To ensure need is met now and in the future, the new Local Housing Strategy 2023 – 2028
increased the target to ensure that at least 10% of all tenure new build stock is suitable
for wheelchair users (increased from 7% in the previous Strategy). The Council and its
registered social landlord partners have developed 180 new build homes (11% of new
supply) suitable for wheelchair users since April 2013. 
2.73 The Strategic Housing Investment Plan has supported the Health and Social Care
Partnership to meet specialist housing need, through dedicated projects using the jointly
developed supported accommodation model and as part of wider site mixes on other
developments. Four new-build supported accommodation units have been developed
across North Ayrshire, providing 62 homes for residents. The Council also created an
additional 33 supported accommodation homes and six new supported living bed spaces
through property refurbishment of three sites. 
2.74 The Council also prioritises the development of homes suitable for older people through
the Strategic Housing Investment Plan, with 318 new amenity homes and 28 sheltered
homes planned. The Council and its partners have delivered 283 amenity homes (17%
of new supply) and 223 units (13% of new supply) of sheltered housing since April 2013. 
SHIP Impact on North Ayrshire school capacity 
2.75 The site acquired by the Housing Revenue Account in March 2021 at Ayrshire Central,
Irvine was identified as having the potential to adversely affect the capacity of Castlepark
Primary School. The housing mix for the site was therefore reprofiled to include a greater
weighting of amenity properties (85 of the 202 homes on the site). As at 31 March 2023,
911 applicants on the North Ayrshire Housing Register requested amenity housing. The
allocation of new amenity homes at Ayrshire Central will free up existing family homes. 
2.76 Experience at other sites demonstrates that new affordable housing developments
generally comprise of families who already reside within the school catchment area.
Officers from Housing, Planning and Education will continue to monitor emerging
developments to ensure any impact upon school capacity can be addressed or
mitigated. 
SHIP Investment 
2.77 The draft Strategic Housing Investment Plan (SHIP) 2024 - 2029 is based on projected
Scottish Government grant funding provision of £124.000m for the Council and its
partner landlords from April 2023 to March 2029. 
2.78 The Council’s projects detailed within the plan represent Council investment of
£194.464m, supported by £78.070m of Scottish Government Grant. 
2.79 An estimated additional £3.869m is anticipated to be required beyond the funding
allocated in the latest HRA 30-year Business Plan, supported by an estimated additional
£0.461m in grant funding to support the Council projects within the plan. This will be
considered within the current review of the HRA Business Plan, prior to it being
432

Page 433

presented to Council in February 2024 as part of the 2024-25 HRA budget and rent
setting. 
2.80 The £3.869m funding requirement comprises, increased budget estimates due to delays
associated with legislation and regulatory changes and budget adjustments required to
align with revised project timelines As noted at 2.8 above, in accordance with Scottish
Government guidance, the Council will seek grant funding above benchmark levels to
offset any funding shortfall, on a site-by-site basis, as required. 
3. Proposals 
3.1  It is proposed that Cabinet (i) approves the North Ayrshire Strategic Housing Investment
Plan 2024 - 2029 for submission to the Scottish Government; and (ii) gives delegated
authority to the Executive Director (Place) and the Cabinet Member for Green
Environment and Economy to liaise directly with the Scottish Government in agreeing the
North Ayrshire development programme and the rescheduling of projects as required. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications arising from the projects included within the Strategic
Housing Investment Plan 2024 - 2029 have been assessed by each of the developing
organisations, ensuring that the programme is fully deliverable within the timescales
set out.  The current HRA Business Plan includes a budget of £190.595m to deliver
the North Ayrshire Council development projects set out within the SHIP, inclusive of
Scottish Government funding. It is estimated that an additional £3.869m is required to
support the Council’s developments set out within the SHIP 2024-2029. This
additional expenditure, alongside estimated additional grant of £0.461m, will be
considered within the current review of the HRA Business Plan prior to it being
presented to Council in February 2024 as part of the 2024-25 HRA Budget and rent
setting. 
Human Resources 
4.2 Council projects within the Strategic Housing Investment Plan will be delivered by
North Ayrshire Council staffing and complemented by external expertise, where
required. 
Legal 
4.3 The Town & Country Planning (General Permitted Development) (Scotland) Order
1992, Schedule 1, Part 12, Class 33, as amended, enables local authorities to
undertake works, within their district, for the erection of dwellings so long as the
development conforms with the Local Development Plan. The Council’s House
Building Protocol governs the design and consultation processes for such
development to ensure that appropriate levels of design scrutiny and consultation are
maintained.  In 2019, it was agreed that all future Council housing developments
progressed as permitted development will be required to obtain a ‘Certificate of
Lawfulness’ from the Council’s Planning Service. This will certify that each site within
the SHIP has been considered against the full terms of the adopted Local
Development Plan. Housing development proposals by the Council which do not fall
433

Page 434

within the scope of permitted development, including schemes which require an
Environmental Impact Assessment (EIA) will require planning permission. Proposals
over 0.5 hectares in area will require to be screened for the purposes of EIA. 
Equality/Socio-economic 
4.4 The provision of new social housing will have a positive impact on those who require
specialist accommodation, older people, those who are homeless, or at risk of
homelessness, and those for whom purchasing a home is not an affordable option.
The benefits of new build housing in relation to health, wellbeing and educational
attainment, are well documented. New housing will also support our island
communities and their economies. 
Climate Change and Carbon 
4.5 New homes should have a low environmental impact, with the aim of reducing fuel
use and associated fuel costs. All projects within the SHIP will be delivered in
accordance with Building Standards regulations for energy efficiency. In addition, the
majority of the new projects incorporated into the plan will meet the Scottish
Government’s ‘Greener Standard’. Innovative approaches to fuel efficient
development will be considered on a site-by-site basis (e.g., zero direct emissions
heating systems, solar photovoltaic panels, smart technologies etc). New Council
homes contribute significantly to the Council’s Sustainability agenda.  New housing is
more energy efficient, better ventilated, and has higher levels of thermal comfort,
which supports improved health and well-being. 
Key Priorities 
4.6 The provision of new affordable housing supports the Council Plan strategic priorities:
‘Wellbeing’; ‘Climate Change’; ‘A Sustainable Council’: and ‘Communities and Local
Democracy’. It supports the ambitions of the Council’s Regeneration Delivery Plan to
drive forward development on strategic regeneration sites, including town centres. 
There is also evidence that children and young people can benefit from improved
cognitive development and a reduction in behavioural issues through living in a more
attractive, warmer, and better ventilated environment and the provision of new
affordable housing also supports the Council Plan priority that children and young
people experience the best start in life. New housing will also support our island
communities and their economies. 
Community Wealth Building 
4.6 The delivery of the Strategic Housing Investment Plan, alongside investment in land
and asset maintenance, plays a key role in community wealth building. Effective use
of community benefit clauses in development contracts, and partnership work with
colleagues in Economic Development to support local construction and supply chain
companies to bid for this work, can secure many of these jobs for local people and
support the Council’s Community Wealth Building Strategy. For example, the
contractor for the Council’s Irvine Harbourside development employed 20 new
employees, created seven apprenticeships, and provided nine work placements. They
also delivered 60 hours of career development initiatives in North Ayrshire schools,
promoting the construction industry as a positive destination for all. 
434

Page 435

5. Consultation 
5.1 The Council has taken a collaborative approach to the preparation of the SHIP, and
the following stakeholders have been involved in the process: 
• ANCHO in partnership with Cairn
• Cunninghame Housing Association
• Riverside (formerly Irvine Housing Association)
• Link Group Ltd
• Trust Housing Association
• The Scottish Government
• North Ayrshire Council Officers (Economic Growth, Education, Finance, Housing,
Planning, Property Management and Investment, Active Travel & Transport, Roads,
and the Health and Social Care Partnership). 
5.2 Regular meetings are held with developing organisations, the Council and the Scottish
Government as part of the SHIP governance process. The meetings will continue to
be convened on a quarterly basis each year, to ensure that partners’ requirements are
identified, and the development programme delivered. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Fiona Ellis, Senior Manager, Housing Strategy and
Development, on 01294 324031. 
Background Papers
Local Housing Strategy 2023 – 2028
435

Page 436

North Ayrshire Council 
Strategic Housing
Investment Plan           
2024 – 2029  
436

Page 437

Page 2 
Contents
Contents
Strategic Housing Investment Plan 2024 – 2029 ............................................................................................................. 1
Contents ....................................................................................................................................................................... 2
Introduction ................................................................................................................................................................... 4
Strategic policy context .............................................................................................................................................. 5
Equalities ................................................................................................................................................................... 5
Childrens rights and wellbeing ................................................................................................................................... 6
Environment ............................................................................................................................................................... 6
Collaboration .............................................................................................................................................................. 6
Investment priorities ...................................................................................................................................................... 8
More homes at the heart of great places .................................................................................................................... 8
Affordability and choice ............................................................................................................................................ 11
Affordable warmth and zero emissions .................................................................................................................... 19
Improving the quality of our homes .......................................................................................................................... 20
Prioritising projects ................................................................................................................................................... 24
SHIP funding streams ................................................................................................................................................. 25
Affordable housing supply programme ..................................................................................................................... 25
Reserves and balances ............................................................................................................................................ 25
Borrowing ................................................................................................................................................................. 25
437

Page 438

Page 3 
Affordable housing policy developer contributions .................................................................................................... 25
Other funding sources .............................................................................................................................................. 26
Council tax on empty and second homes ................................................................................................................. 26
Planning and other regulatory matters ........................................................................................................................ 27
Delivery risks .............................................................................................................................................................. 28
Amendments or additions to the plan .......................................................................................................................... 28
Development projects ................................................................................................................................................. 29
Irvine & Kilwinning .................................................................................................................................................... 29
Three Towns ............................................................................................................................................................ 30
North Coast .............................................................................................................................................................. 31
Garnock Valley ......................................................................................................................................................... 32
Arran ........................................................................................................................................................................ 32
Locality to be confirmed ........................................................................................................................................... 32
Progress update ......................................................................................................................................................... 33 
438

Page 439

Page 4 
Introduction
The Strategic Housing Investment Plan 2024-2029 sets out the priorities for affordable housing investment in North Ayrshire over the next
five years and outlines how the Council and its partners will deliver these priorities. The focus of the plan is to support the Scottish
Government’s Affordable Housing Supply Programme (AHSP) to deliver affordable housing in North Ayrshire. 
The provision of new build housing has many benefits, including, helping to regenerate the area, providing sustainable housing solutions
which help to address fuel poverty and support educational attainment, and supporting the ageing population and people with accessible
housing and particular needs to live more independently. 
For the second consecutive year, the Council and its partners have not included any additional new build housing in the Strategic Housing
Investment Plan however the Council has increased its buyback programme and all North Ayrshire developing registered social landlords
now have buyback programmes included within the plan. The Council and its registered social landlord partners have experienced significant
affordability challenges and pressures. The rate of inflation and rising material costs have significantly impacted upon construction costs and
project viability. 
Increasing standards and emerging legislation also impact upon project costs and timelines as options
appraisals and financial modelling are required prior to implementation. For example, the cost to tenants
and future maintenance and replacement costs of zero direct emissions systems had to be reviewed
with solutions considered on a site-by-site basis to ensure that they were affordable to install and for
tenants to utilise. The Council’s standard house types had to be revised to accommodate new
equipment to support the heating systems. Further delays and increased costs are likely to be
experienced as Housing for Varying Needs and Building Standards are revised to enhance accessibility
and adaptability of housing stock. These changes are likely to impact upon the Council’s standard
house types and construction costs. 
Development is not the only policy intervention being explored by the Council. It would be very difficult
for the Council and its partners to meet housing need only through investment in new homes. Work to
maintain and improve the condition of existing social housing stock, provide aids and adaptations and
improve the private rented sector are all intended to address the housing needs of the local population. 
The Council and developing registered social landlord partners with stock in North Ayrshire all have
buyback programmes within the plan to increase affordable housing in the area and contribute to wider
regeneration and estate management. 
439

Page 440

Page 5 
Strategic policy context
Housing to 2040, Scotland’s first 20-year housing strategy, was announced in March 2021. The strategy commits to providing around £16bn
of investment to support the delivery of 100,000 new homes by 2032, with at least 70% for social rent.  The Scottish Government’s Affordable
Housing Supply Programme comprises a range of funding mechanisms to enable affordable housing providers to deliver homes in
communities across Scotland to support local authorities’ Local Housing Strategies.  The Scottish Government allocated Resource Planning
Assumptions for the full five-year period of the current parliament to deliver the ambitious affordable homes target set out in Housing to 2040.
The Council’s Cabinet approved the latest Local Housing Strategy 2023-28 on 13 June 2023. The Local Housing Strategy sets out the
Council’s ambition: 
‘We want all our people to live in the right homes, in great places, with access to any support services they need.” 
The strategy mirrors the format of Housing to 2040 and sets out four overarching outcomes which align to the four key strategies in Housing
to 2040 as detailed below. 
The Strategic Housing Investment Plan is an extension of, and aligns to, the Local Housing Strategy. In preparing the plan, the Council has
referred to the outcomes identified in the Local Housing Strategy, which support the objectives of the Council Plan. 
The Strategic Housing Investment Plan also aligns with the Council’s Community Wealth Building Strategy, which sets out how the Council,
in conjunction with residents, will recover and renew services by building upon the outcomes of the Council Plan; committing to Community
Wealth Building; and committing to a Green New Deal.
Equalities
In line with the Council Plan, fairness and equity is core to the Strategic Housing Investment Plan. It strives for a North Ayrshire where
everyone has the same life chances to grow, prosper and have fulfilling and healthy lives.  An Equality Impact Assessment has been
undertaken for the Strategic Housing Investment Plan.  It found that there are no negative or discriminatory effects on any equality groups. 
Housing to
2040 strategy
More homes at the heart of
great places Affordability and choice Affordable warmth and
zero emission homes
Improving the quality of all
homes
Local Housing
Strategy
outcome
Our places support thriving
and inclusive communities
Our people have affordable
homes in the place they
choose to live
Our homes are energy
efficient and release less
emissions
Our homes are in good
condition and people can
access any support
services they need
440

Page 441

Page 6 
The provision of new social housing will have a positive impact on those who require specialist accommodation, older people, those who are
homeless, or at risk of homelessness, and those for whom purchasing a home is not an affordable option. The benefits of new build housing
in relation to health, wellbeing and educational attainment, are well documented. Public Health Scotland’s Healthy housing for Scotland report
recognises that adequate housing which is safe, accessible, available, appropriate and high quality is key to us achieving the highest attainable
standard of health.  
Childrens rights and wellbeing
The North Ayrshire Child Poverty Action Plan 2022-2023 notes that North Ayrshire has the second highest level of child poverty after housing
costs of any area in Scotland. Access to good quality and affordable housing is a key asset in addressing child poverty, and poverty overall.   
Research undertaken by Shelter suggests children can
benefit from improved cognitive development and a
reduction in behavioural issues through living in a more
attractive, warmer, and better ventilated environment. 
All new build Council family homes have study space
and private gardens. 
Environment
A Strategic Environmental Assessment pre-screening
questionnaire undertaken confirmed that there would
be no likely significant adverse environmental effects
from the activities set out within the Local Housing
Strategy (which are not already subject to Strategic
Environmental Assessment elsewhere), and for this
reason a full strategic environmental assessment was
not required. The likely environmental impact of
development proposals (both positive and adverse) are
scoped within the Strategic Environmental Assessment
for the North Ayrshire Local Development Plan.
Collaboration 
As the strategic housing authority, the Council is committed to supporting partners to deliver affordable housing development within North
Ayrshire.  The Council adopts a collaborative approach in the preparation of the Strategic Housing Investment Plan. The key stakeholders
listed on the next page have influenced the final programme.
441

Page 442

Page 7 
Key stakeholders 
Local registered social landlord partners, including ANCHO, Cairn, Cunninghame Housing Association, Link Group Ltd,
Riverside Scotland and Trust Housing Association 
North Ayrshire Council departments, including Economic Growth, Education, Finance, Housing, Planning, Property
Management and Investment, Active Travel and Transport, Roads, and the Health and Social Care Partnership   
The Scottish Government 
The Council and its partners engage with communities when developing new build sites in the Strategic Housing Investment Plan.  For Council
projects local residents are invited to review and comment upon the draft plans for the site.  Thereafter the final plans are presented to the
community and local residents are also invited to ‘Meet the Builder’ when a contractor has been appointed. Following the completion of each
new site, design teams assess each project’s success in delivering places people can be proud of, as part of the ‘lessons learned’ review.
Developing the Strategic Housing Investment Plan 
The priorities set out within the Strategic Housing Investment Plan were developed with partners and the local community through the
preparation of the new Local Housing Strategy. 
The Council invited site nominations for the plan from its registered social landlord partners. No new site nominations were received. All
existing developments were considered on their individual merits, with reference to the development priorities set out within the Local Housing
Strategy and any known constraints. Thereafter, the Council issued the draft plan to partners to review. The Council will continue to monitor
the development programme and new opportunities at quarterly meetings with developing landlords and the Scottish Government. 
Council Officers monitor the impact of the new build programme on education facilities and other services through the Strategic Housing
Investment Plan project board. If any project becomes delayed or non-viable, the Council will work with registered social landlord partners
and the Scottish Government to ensure that new homes are delivered by accelerating other projects within the plan.
Continual improvement
The Council regularly meets the Scottish Government and partner landlords to review the progress of the Strategic Housing Investment Plan
and share good practice.  The Council holds ‘lessons learned’ meetings and undertakes tenant satisfaction surveys for each site.
442

Page 443

Page 8 
Investment priorities
The Local Housing Strategy notes that the Strategic Housing Investment Plan will be reviewed annually to establish affordable housing
investment priorities for the Council and its partners which seek to address the key priorities established within the Local Housing Strategy,
set out below.
More homes at the heart of great places
The places we live have a significant impact on wellbeing. High quality places are safe, provide access to services and can help to reduce
isolation and enhance communities. Place making principles form the foundation of project development, informing site selection (where
appropriate) and the design process. 
North Ayrshire has a diverse housing market comprising rural, urban and island communities. The Council has established six localities: 
20-minute neighbourhoods 
The provision of housing within 20-minute neighbourhoods allows people to meet
their needs locally and encourages active transport.  The goal is to support a better
quality of life in places, whilst making towns and villages more resilient. The Strategic
Housing Investment Plan will prioritise new social housing developments which
support the principles of 20-minute neighbourhoods, where feasible. 
Regeneration and town centres 
Public sector investment can have a transformational impact for communities, and
there are cumulative benefits through considering how this can be coordinated with
developing partners and the private sector. The Council explores site and area
specific opportunities with partners to secure maximum regeneration benefits. This
supports the ambitions of the Council’s Regeneration Delivery Plan to drive forward
place-based development on strategic regeneration sites, including town centres.
Arran Garnock Valley Irvine Kilwinning North Coast Three Towns
443

Page 444

Page 9 
Town centre regeneration is a primary focus of the Strategic Housing Investment
Plan, with several projects completed to date within, or near, town centres. The plan
supports major housing led regeneration in North Ayrshire, an example being
provision for the replacement of the 275 homes in the Fullarton tower blocks being
demolished in Irvine. Regeneration often results in higher development costs as sites
require demolition, refurbishment or have significant constraints/ abnormal costs.
The Strategic Housing Investment Plan also includes the provision of funding for 250
units to assist the delivery of Housing’s Estate Based Regeneration Programme. This
investment aims to provide new homes to replace any stock which requires to be
demolished or reconfigured as part of the Estate Based Regeneration Programme. 
Green space
Research shows that where people have access to good quality outdoor green space, there is a corresponding positive and lasting impact
on public health. The Strategic Housing Investment Plan will prioritise new social housing developments which include the provision of
outdoor green space for residents. 
Island communities 
The Council is committed to supporting island communities. General needs houses, amenity bungalows and homes for wheelchair users
were provided on the Isle of Cumbrae during summer 2021 (18 homes) and at Brathwic Terrace on the Isle of Arran during summer 2022
(34 homes). A ‘Local Lettings Initiative’ was introduced for Arran prior to the allocation of the new Council homes. 
The Local Lettings Initiative gives additional priority to island residents and key workers.  Arran Development Trust has secured funding from
the Rural and Island Housing Fund to deliver 18 new affordable homes in Lamlash and Trust Housing Association is currently in discussion
with a local landowner to develop a further 26 new homes in Brodick.  
The Council has established the Arran Housing Task Force to quantify demand for affordable housing on Arran and identify issues that may
be limiting economic growth. A quantitative study is being undertaken to determine affordable housing demand on the island, recognising the
assessed housing demand information from the North Ayrshire Housing Register and community feedback. The task force membership
includes the Scottish Government, local community groups and Arran registered social landlords. The group will develop an action plan to
address any identified housing issues on the island. 
444

Page 445

Page 10 
The Local Housing Strategy recognises that it is more expensive to build new homes on islands, compared to the mainland. Higher living,
transport, infrastructure, and fuel costs alongside limited on-island construction companies are identified as contributing factors to this issue.
These issues are being explored as part of the Community Wealth Building ambitions and Local Island Plans. 
Wider action  
The Council’s Community Wealth Building Strategy introduced a new model to develop resilient, inclusive local economies, with more local
employment and a larger and more diverse business base, ensuring that wealth is locally owned and benefits local people.  Through the
Strategic Housing Investment Plan, contractors are expected to participate in the Council (or partners’) Community Benefits scheme,
providing apprenticeships to young people, skilling up the local workforce and supporting economic growth. Homes for Scotland suggests
there are 4.1 jobs created for every new home constructed. Effective use of community benefit clauses in development contracts, and
partnership work with colleagues in Economic Development to support local construction and supply chain companies to bid for this work,
can secure many of these jobs for local people. 
The Council’s housebuilding programme can support the Council’s ambitions to encourage more young people into training and employment.
The North Ayrshire Local Employability Partnership Delivery Plan 2022 – 2026 sets out the intentions to help people of all ages to gain skills
for employment. It will prepare people for employment, training, education and/ or volunteering, with the aim of increasing qualification levels
and job prospects as well as reducing unemployment.  Developing the Young Workforce have launched an online Skills Academy to support
school leavers and job seekers. 
445

Page 446

Page 11 
Affordability and choice
Housing demand
The Local Housing Strategy has set a target of 1,625 new social
housing units and a private rented sector target of 1,300 new units.
There were 6,467 applicants on the North Ayrshire Housing Register
on 31 March 2023, of these, 3,327 applicants had an assessed
housing need. When transfer applicants are deducted 2,655 applicants
remain (transfer applicants leave an existing social tenancy behind for
reallocation when they are rehoused). 
Figure 1 opposite details housing register applicant needs. Please note
that the numbers are not mutually exclusive, for example, applicants
can request both amenity and sheltered homes.
Location
There is no limit to the number of letting areas applicants can select when
making a housing application and demand has therefore been assessed
proportionately below to reduce double counting. It is important to note that
individual housing allocations can impact upon demand within areas. For
example, if an applicant housed in the Three Towns also had Arran as an
area of preference this would reduce demand for housing in Arran.
North coast, Irvine and Kilwinning are the most pressured localities. Further
analysis is required to determine housing pressures within the Arran and
Cumbrae localities as the proportionate analysis is not effective in
determining pressure within smaller localities. 
This work is underway for Arran through the Arran Housing Task Force,
previously referenced in the ‘Island communities’ section of this document.
The Council will assess the demand for further new build housing on
Cumbrae during the lifetime of the plan.
3,327 applicants
with an assessed
housing need
111 require
larger homes
(6 people or
more)
227 homeless
applicants
81 require OT
assessed
adapted homes
178 requests for
wheelchair
accessible
homes
353 requests for
sheltered
housing
910 requests for
amenity housing
Figure 1: Applicant needs (Source: Housing Register, March 2023)
Figure 2: Proportionate demand for social housing by locality
(Source: North Ayrshire Housing Register, March 2023)
Arran, 113, 3%
Garnock
Valley, 305,
9%
Irvine,
1316,
40%Kilwinning,
461, 14%
North Coast
including
Cumbrae,
363, 11%
Three
Towns, 769,
23%
446

Page 447

Page 12 
The total number of homes which will be developed over the lifetime of the Strategic Housing Investment Plan have been plotted by locality
in figure 3 below. These new supply figures illustrate the aspiration to plan for a growing population, and to seek continued investment in
housing stock to improve overall stock condition. They have been plotted alongside the net gain for the same period, proportionate demand
from the housing register as at 31 March 2023 and historic new build completions from April 2013 to March 2023.   
Figure 3: Completions, net gain, proportionate demand, and historic completions 
The 'net gain' column indicates the additional homes available per locality following completion of the developments, minus the strategic
demolitions set out in the Strategic Housing Investment Plan.
0
200
400
600
800
1000
1200
1400
Irvine Kilwinning 3 Towns North Coast Garnock Valley Arran TBA
SHIP Completions 2013 - 2023 SHIP Completions 2024-2029
Net Gain 2024-2029 Proportionate Demand from NAHR
447

Page 448

Page 13 
Size
Applicant house size requirements are determined by the strategic bedroom need which is the minimum number of bedrooms required based
on household composition. The proportion of homes by bedroom size is noted by locality in the table below based on proportionate demand. 
Table 1: Proportionate housing demand by strategic bedroom need and locality (Source: North Ayrshire Housing Register, March 2023)
Analysis of the North Ayrshire Housing Register identifies demand trends for properties. House size has been identified by considering the
minimum accommodation size suitable for the household; this is referred to as the 'strategic bedroom requirement’.   
The strategic bedroom need is used for planning purposes only. Generally, one-bedroom homes are found to be of lower demand.  Two-
bedroom homes are a more popular option for smaller households and are more flexible in meeting households’ future needs. An additional
bedroom can also provide study space, or space for home working. 
An indicative size mix (Table 2) for developments across North Ayrshire has been prepared by uplifting the two-bedroom provision and
reducing the one-bedroom, thus meeting tenant aspirations and providing flexibility in terms of property sizes as households change
composition over time. 
Table 2: Altered demand by bedroom size (reflecting aspiration) and locality
This mix is intended as a guide only; each project will be considered on a site-by-site basis by the developing organisation, before being
approved by the Council.
Number of
Beds Arran Garnock
Valley Irvine Kilwinning North Coast Three Towns North
Ayrshire
1 51% 55% 56% 55% 59% 59% 57%
2 16% 13% 15% 13% 16% 14% 14%
3 22% 19% 15% 18% 16% 15% 16%
4+ 11% 13% 14% 14% 9% 12% 13%
Number of
Beds Arran Garnock
Valley Irvine Kilwinning North Coast Three Towns North
Ayrshire
1 16% 13% 15% 13% 16% 14% 14%
2 51% 55% 56% 55% 59% 59% 57%
3 22% 19% 15% 18% 16% 15% 16%
4+ 11% 13% 14% 14% 9% 12% 13%
448

Page 449

Page 14 
The Council will consider the need for housing for larger families in advance of the preparation of the Strategic Housing Investment Plan
2025 – 2030. The Council currently has plans to build four, five and six-bedroom homes within its development programme.
Homelessness
North Ayrshire Council’s Rapid Rehousing Transition Plan was approved in 2019 and sets out how the Council and its partners will work
together to implement a housing led approach to meeting the needs of homeless households. Where it is not possible to prevent
homelessness, the priority is to secure a settled housing option for every homeless household as quickly as possible.  The plan aligns with
the housing supply priorities set out within the Strategic Housing Investment Plan. The Rapid Rehousing Transition Plan priorities are to: 
The provision of new affordable housing which meets housing applicants needs and aspirations through the Strategic Housing Investment
Plan will continue to support the delivery of the Rapid Rehousing Transition Plan. 
Gypsy/ travellers  
The Council has not identified any additional demand issues in relation to accommodation for gypsy/ travellers.  The Council has reviewed
the condition of the permanent site at Redburn Grove, Irvine in consultation with residents to identify any future maintenance and investment
works. An options appraisal is underway to develop plans and a business case for site improvements. The Council will make an application
to the Scottish Government’s Gypsy/ Traveller Accommodation Fund to seek funding for any necessary renovation or improvements when
this is complete.  
Housing for key workers 
The Council will assess the need to bid for funding for housing for Key Workers through the Scottish Governments five year £25million fund
during the lifetime of the Strategic Housing Investment Plan. 
proactively prevent
homelessness
wherever it is
possible to do so
reduce the time
spent by homeless
households in
temporary
accommodation
reduce the number
of hostel places and
prioritise the use of
dispersed
accommodation
reduce the overall
number of
temporary
accommodation
units
implement Housing
First for our most
complex and
disadvantaged
service users
shift funding towards
flexible, floating
housing support
services
449

Page 450

Page 15 
Ensuring best value
As part of the tendering process, the Council prepares minimum specifications for materials utilised in the new build developments to ensure
that they align to current lifecycle replacement and maintenance programmes.  A suite of standard house types has also been developed to
further assist with maintenance programmes and reduce project design costs. 
The Council is committed to making efficiency savings through strategic procurement arrangements in the delivery of the new build affordable
housing programme, to ensure value for money for tenants.  Several Strategic Housing Investment Plan projects have been procured through
Hub South-West, as part of a procurement strategy to achieve cost and time savings through economies of scale.   
The Council has also, with ten local authority partners, worked with Scotland Excel to develop a New Build Residential Construction
Framework Agreement available for use by all Scottish local authorities and registered social landlords. 
The Council has been utilising off site construction following a successful pilot scheme at Ardrossan Road, Seamill. During summer 2023, six
new amenity bungalows were developed in Stevenston town centre. The construction method results in less waste and has sustainability
benefits. It also reduced the construction time on site, and in turn, reduced disruption for local residents and businesses from site traffic and
works. 
450

Page 451

Page 16 
Rent levels and affordability 
The Scottish Housing Regulator expects social landlords to be able to demonstrate affordability and engage meaningfully with tenants on
rent increases. Increasing costs and inflation mean that retaining affordable rent levels is a significant challenge for the Council and its
partners. 
Empty homes and second hand buy backs
Empty homes are detrimental to the local environment, often the
target of antisocial behaviour, and are more likely to fall into
disrepair. The Council and its partners recognise that bringing
former social housing stock into ownership can assist with
housing management and maintenance issues and increase
housing available through the North Ayrshire Housing Register. 
All developing registered social landlord partners with stock in
North Ayrshire now have provision for buyback programmes
within the Strategic Housing Investment Plan.   
Duration empty 2020/21 2021/22 2022/23
Less than 6 months 35 18 23
6 to 12 months 61 71 3
1-2 years 15 136 31
2 to 5 years 10 109 64
5 to 10 years 0 0 2
More than 10 years 0 0 0
Total 121 334 123
Figure 4: Afton Court development of six amenity bungalows utilising off site construction in Stevenston town centre
Table 3: Empty homes brought into use per annum 2020/21 to 2022/23 
451

Page 452

Page 17 
The Council has acquired three empty homes over the past three
financial years which have been brought back into use as Council
stock. Table 3, on the previous page, details the number of empty
homes brought back into use in North Ayrshire from April 2020 until
March 2023, all of these homes were subject to the Council Tax
levy (this is where the Council currently focuses empty homes
resources).   
A post has been funded for the Council’s Private Sector Advice
Team from the reduction in discount for empty and second homes
Council Tax in North Ayrshire since April 2022 to focus on bringing
empty homes back into use. 
Private sector support
The Council’s Private Sector Advice Team provide advice on
private sector housing issues in North Ayrshire. The service is part
of the revised Scheme of Assistance 2019 which introduced a
range of new measures to improve private sector housing
condition, including: 
A ‘pre-tenancy support service’ for landlords to aid the
prevention of future property condition issues. 
A ‘missing shares scheme’ to remove barriers where a
property owner refuses to meet their common repair
obligations. 
Use of the Council’s powers for Compulsory Purchase
Orders (CPOs) where appropriate to acquire empty
properties in poor condition, bringing them back into
mainstream housing stock. 
An Empty Homes Loan Fund to assist property owners to
bring properties back into effective use.
Before and after photos of an empty home brought back into use
452

Page 453

Page 18 
Second homes 
The Council’s Local Housing Strategy notes that there are 1,500 second homes in the area, almost all of which are located on the islands.
On Arran, one in four privately owned houses are second homes; on Cumbrae this rises to 43%. This reduces the number of homes available
for local people, and in turn pushes up house prices and private rent charges. 
The Scottish Government has committed to introducing new powers for local authorities to cap the number of second homes in an area. The
intention is to provide a tool to create a viable balance between the number of second homes and permanently occupied homes. 
Alternative models of affordable housing delivery 
Recognising that a suite of affordable housing solutions is required to meet the needs and aspirations of local people, the Council has
embarked on a pilot project aimed at the private housing sector Home Ownership Made Easy ‘HOME’.  
Home ownership made easy (HOME)
The Council is reviewing the viability of the
‘HOME (Home Ownership Made Easy)’
project based on a model devised by
Scottish Futures Trust. This shared
ownership housing option aims to provide
households the opportunity to purchase a
stake in a home. 
The Council and our partner registered
social landlords will continue to review
alternative housing models which could be
utilised to increase affordable housing
supply during the lifetime of the Strategic
Housing Investment Plan. 
453

Page 454

Page 19 
Affordable warmth and zero emissions
Sustainability
The Council’s Environmental Sustainability and Climate Change Strategy
includes actions to achieve net-zero carbon emissions by 2030.  New
housing has a key role to play in carbon reduction, climate change
mitigation, and alleviation of fuel poverty. 
The Council and its partners will continue to consider innovative and
sustainable approaches to heat and power, such as low carbon heat, solar
photovoltaic panels and smart technologies.  The Council will ensure that
all new build housing utilises Net Zero Direct Emissions heating systems
in accordance with building standards. In advance of the new regulations
the Council installed three biomass district heating schemes in
Stevenston, Dalry and Largs. A bespoke energy strategy has been created
for each emerging new housing development to ensure that the heating
options for the sites are both energy efficient and affordable for tenants.   
The Council recognises that a ‘fabric first’ approach to sustainability can
provide benefits to tenants, in terms of reducing heating costs. It also
benefits the environment as all homes are designed to minimise heat loss. 
The Council completed two ‘sustainable demonstrator homes’ within
Dickson Drive, Irvine in 2020 to highlight best practice in design and
innovation, ensuring benefits from sustainable technologies are
maximised. The benefits are currently being assessed, and the findings
will be shared with partners to inform future developments.   
Also, in recognition of the safety benefits of sprinkler systems, the Council
installed sprinklers in all new build housing proposals which reached
technical design stage after October 2019, prior to the introduction of
Building Standards legislation in March 2021.
454

Page 455

Page 20 
Secure by design
Successful design can contribute to community stability and promote feelings of safety
and inclusion. All Council developments are planned utilising ‘secure by design’
principles.  
Active travel
Access to safe walking networks, cycle pathways and public transport connects
communities to local amenities and services. In turn, these can result in direct health
benefits, through increased physical activity and reduced air pollution. They can also
lead to indirect health benefits by providing improved access to opportunities for
employment, leisure, and healthcare services.
The sustainable travel hierarchy, illustrated in figure 5 opposite, sets out the transport
priorities for sustainable transport in development.
Improving the quality of our homes
Over 40% of the stock developed by the Council and its partners since April 2013 has
addressed particular housing needs, demonstrating the commitment to supporting
tenants to live independently. The cost of particular needs housing is often more expensive than general needs housing, for example,
housing for wheelchair users has a larger ground floor footprint, increasing construction costs and reducing economies of scale as site
densities are reduced. Similarly, supported accommodation and sheltered housing require communal space which also increases costs.
Wheelchair accessible accommodation
All amenity and sheltered housing in North Ayrshire should be built to an ambulant housing standard as a minimum. To ensure need is met
now and in the future, the new Local Housing Strategy increased the target to ensure at least 10% of all tenure new build stock is suitable
for wheelchair users (increased from 7% in the previous strategy). In recognition of the benefits of providing adaptable housing, and to
address demand from the North Ayrshire Housing Register, the Council and registered social landlord partners developed 180 (11% of new
supply) new build homes suitable for wheelchair users since April 2013. The Strategic Housing Investment Plan 2024 – 2029 estimates the
delivery of a further 172 (13% of new supply) homes suitable for wheelchair users. 
Figure 5: Sustainable travel hierarchy
455

Page 456

Page 21 
In addition, a set of standard house types for Council
developments were designed in partnership with
Housing Services Occupational Therapists which are of
an accessible design to make best use of assets and
adapt to tenants’ changing mobility needs.   
In preparing North Ayrshire’s third Local Development
Plan, the Council will further consider the housing needs
of older people and disabled people in the area and the
establishment of an appropriate target for the delivery of
accessible or adaptable homes, including wheelchair
housing and intergenerational homes within the private
sector, to support independent living particularly although
not exclusively among older or disabled people. 
Occasionally it may be necessary to build larger
specialist housing to meet the specific needs of individual
households. Where this is provided by a registered social
landlord, the Council will approve the proposals before a
planning application is submitted.
Supported accommodation 
Officers within the Place Directorate and the Health and Social Care Partnership developed a new supported accommodation housing model
which has been implemented at sites across North Ayrshire. 
The focus is on maximising independence for adults within a homely setting, who require a higher level of support, and who are living with
learning disabilities, or mental illnesses (all ages), or who are under 65 years and have physical disabilities.  The new supported
accommodation model can: 
prevent demand for
additional services
support a more
independent lifestyle
for service users
integrate residents
into community life
use technological
advances to support
care provision
provide care and
support in a homely
setting
provide a base for
effective care
provision
456

Page 457

Page 22 
The Strategic Housing Investment Plan has supported the Health and Social Care Partnership to meet specialist housing need through four
dedicated supported accommodation projects which have provided 62 (4% of new supply) new homes across North Ayrshire.
Housing for older people 
The Local Housing Strategy recognises that the
proportion of older people in North Ayrshire is higher
than that of Scotland as a whole (23% compared to
19%). It further predicts that by 2043 the over 75 age
group will account for 28% of local people. 
Recognising the need to develop housing solutions
appropriate for the older population, the Council and
its partners have delivered 283 (17% of new supply)
amenity homes and 223 (13% of new supply) units of
sheltered housing since April 2013. The Council
ensures that its sheltered housing is developed
utilising dementia friendly design principles. The
Strategic Housing Investment Plan 2024 – 2029
estimates the delivery of a further 311 (24% of new
supply) amenity homes and 28 (2% of new supply)
sheltered housing units. 
457

Page 458

Page 23 
Alongside the new build programme, the Council will continue to deliver its sheltered housing re-provisioning programme, which includes
£25m investment in the refurbishment of sheltered housing units out with the Strategic Housing Investment Plan. 
Extra care housing
Housing Services and the Health and Social Care Partnership worked
together over the last few years to develop a model for Extra Care
Sheltered Housing. The vision was to create safe, affordable homes
for tenants who require additional support, with extra services to
promote independent living, such as assistance with meals or welfare
checks, to be available to tenants for an additional fee. 
Following development of the outline model, demand analysis was
undertaken by the Health and Social Care Partnership in 2021
alongside engagement with other areas in Scotland where similar
housing models operate.  At that time, it was determined as an
outcomes of the analysis that there was not sufficient demand to
integrate the extra care model into a new sheltered housing complex. 
The Council has, however, incorporated flexibility into some new build
sheltered complexes to allow this model to be reconsidered in the
future should the Health and Social Care Partnership chose to develop
this further.
458

Page 459

Page 24 
Assistive technology 
The Flatt Road development in Largs provides an exemplar for assistive technology to promote independent living. Features that can be
installed within the sheltered housing complex and supported accommodation, where required, to support tenants’ individual needs include: 
Prioritising projects
All projects which meet the criteria outlined above will be ‘high priority’. In the case of developments by registered social landlords the
housing mix and type for each individual development site and the proposed rent levels for the new homes should be formally agreed with
the Council prior to the submission of a planning application. 
Projects from the Strategic Housing Investment Plan 2023-2028 which have not yet completed have been included in the new 2024-2029
plan.  Thereafter, the Council will prioritise all projects which are considered deliverable and meet the strategic goals outlined above. 
super-fast broadband
smart heating controls
automatic lights and blinds
an integrated home communications hub with:
video door
entry video calls electronic
welfare checks
enhanced
assistive
technology
safety
monitors and
sensors
electronic note
board and
calendar
android apps
459

Page 460

Page 25 
SHIP funding streams
Affordable housing supply programme
The Scottish Government has committed £47.313m funding for North Ayrshire from April 2023 to March 2026 (see table 4 below). The
Strategic Housing Investment Plan is based on projected grant funding of £124.000m.  Funding for Council projects not yet at tender stage
has been assumed at benchmark plus annual Scottish Social Housing Tender Price Index inflation which has been assumed at 3.7% for
2024/25.  The Council will seek grant funding above these levels on a site-by-site basis, as required. The registered social landlord funding
rates have been included as requested by each developing organisation and will be subject to Scottish Government authorisation.     
To meet the requirement for ‘slippage’, in accordance with Scottish Government guidance, the Council has over committed the funding within
the Strategic Housing Investment Plan.  The slippage requirement is to ensure that the allocation is fully spent even if delays or constraints
emerge on other development sites, and to provide the opportunity for North Ayrshire to absorb slippage from other local authority areas. 
Table 4: North Ayrshire resource planning assumption per annum 2023/24 to 2025/26 and assumptions for 2026/27 to 2028/29
Reserves and balances
All developing organisations will utilise available reserves and balances to support the development programme. 
Borrowing
A large portion of development funding is secured from borrowing. Private finance supports registered social landlords development
programme, and prudential borrowing supports local authority new build projects. 
Affordable housing policy developer contributions
The Council’s previous Affordable Housing Policy (RES4), which required contributions to affordable housing provision from specified private
developments within North Ayrshire, was removed within the new Local Development Plan (LDP2) adopted on 28 November 2019. 
2023/24 2024/25 2025/26 2026/27 2027/28 2028/29
RPA £15.648m £15.702m £15.963m £23.500m £25.500m £27.687m
460

Page 461

Page 26 
Developer contributions, in the form of commuted sums, received through the application of the Affordable Housing Policy under the previous
Local Development Plan, will be utilised to fund projects being delivered through the Strategic Housing Investment Plan, when required. 
The Council had an on-site contribution through the affordable housing policy at the 31-unit Ardrossan Road, Seamill development. The
table below details the number of units supported per annum and the value of these contributions. All projects supported were delivered as
part of the Affordable Housing Supply Programme. 
Table 5: Projects supported by developer contributions April 2020 to March 2024 
2020/21 2021/22 2022/23 2023/24 Total
Number of units supported 0 0 34 34 34*
Funding value 0 0 £47,500 £18,750 £76,250 
As at 31 March 2023 the Council had £0.019m of funding from developer contributions in hand. The Council will utilise any other incoming
funds to support Council projects within the Strategic Housing Investment Plan and partner developments, where appropriate. 
*Please note that the project supported spanned two financial years so the total number of units was 34. 
Other funding sources
The Council will consider utilising other funding sources to support the Strategic Housing Investment Plan, where appropriate. The Council
successfully secured £0.6m from the Scottish Government’s Low Carbon Vacant and Derelict Land Investment Programme to support the
King’s Arms, Irvine town centre regeneration project. The Council and its partners do not have any current plans to seek funding from the
Housing Infrastructure Fund. 
Council tax on empty and second homes
Income received from the reduction in discount for empty and second homes in North Ayrshire is held in the Council’s Affordable Housing
Account. Table 6, on the next page, details the number of units supported per annum and the value of these contributions. All projects
supported were delivered as part of the Affordable Housing Supply Programme. 
461

Page 462

Page 27 
Table 6: Projects supported by Council Tax on empty and second homes April 2020 to March 2024 
2020/21 2021/22 2022/23 2023/24 Total
Number of units supported 191 469 321 27 927*
Funding from Council Tax levy on
second homes and empty homes £1,252,078 £2,024,139 £541,320 £166,812 £3,984,349 
As at 31 March 2023 the Council had £2.038m of funding from the Council Tax levy on second and empty homes and an estimated annual
income of £0.978m. The Council will utilise the funds to support Council projects within the Strategic Housing Investment Plan and partner
developments, where appropriate. 
*Please note that a number of the projects supported spanned two financial years so the total number of units was 927.
Planning and other regulatory matters 
In 2014, the Council’s Cabinet approved the House Building Protocol, to be used
in all Council housing development projects that meet the criteria for permitted
development. Class 33 of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992, as amended, enables local authorities to
carry out works, within their district, for the erection of dwellings so long as the
development conforms with the Local Development Plan. 
In 2019, it was agreed that all future Council housing developments progressed as
permitted development will be required to obtain a ‘Certificate of Lawfulness’ from
the Council’s Planning Service. This will certify that each site within the SHIP has
been considered against the full terms of the adopted Local Development Plan.
Housing development proposals by the Council which do not fall within the scope
of permitted development, including schemes which require an Environmental
Impact Assessment (EIA) will require planning permission. Proposals over 0.5
hectares in area will require to be screened for the purposes of EIA. 
462

Page 463

Page 28 
Delivery risks
Through experience, and engagement with registered social landlords and other developers,
development constraints or risks to delivery of the programme have been identified as: 
• Inflation of building costs and rising tender prices
• Shortages of materials
• Capacity within the building and development industry across the country
• Costs of infrastructure and ground remediation
• Delays obtaining statutory utility consents
• Emerging costs relating to legislative and building standards regulations amendments 
The Council and its partners will continue to work closely to monitor and actively manage
these risks through the period of the Strategic Housing Investment Plan.
Amendments or additions to the plan
The delegated authority to accelerate any project detailed within the North Ayrshire approved SHIP is held by the Executive Director (Place)
and the Cabinet Member for Green Environment and Economy. 
463

Page 464

Page 29 
Development projects
An overview of projects detailed in the Strategic Housing Investment Plan tables is provided below by locality.   
Irvine & Kilwinning
Project Timeline Site Information
Harbourside, Irvine
(NAC)
71 units
Site Start: October 2020
Completion: 12 April 2023
The intergenerational development with a particular focus on older people’s housing
provision delivered amenity bungalows, sheltered housing, general needs houses and
homes for wheelchair users. The high-demand area is a short walk from Irvine beach
park, train station, shopping mall and town centre. 
Bourtreehill Village,
Irvine (NAC)
32 units
Site Start: Autumn/ winter 2024 
Expected Completion:  Autumn/
winter 2028
The site will see the regeneration of the Bourtreehill Village area of Irvine. The site is
expected to deliver new retail provision and 32 new homes.  
Corsehillhead,
Kilwinning (NAC)
7 units
Site Start: Early 2024 
Expected Completion: 
Early 2025
The site will deliver a mix of general needs and amenity accommodation in the Corsehill
area of Kilwinning.
Montgomerie Park,
Irvine (NAC)
189 units
Site Start: Summer 2024
Expected Completion: 
Winter 2027  
This site will provide a mix of general needs, amenity, and wheelchair user
accommodation. 
Ayrshire Central, Irvine
(NAC)
202 units
Site Start: Spring 2024
Expected Completion: 
Spring 2027
Located in a high demand area, this site will deliver a mix of general needs, amenity, and
wheelchair properties at the Ayrshire Central, Irvine site.  
Stanecastle, Irvine
(NAC) 
31 units
Site Start: Early 2024
Expected Completion: 
Summer 2025
This site will deliver a mix of general needs, amenity, and wheelchair user
accommodation on the site of the former Stanecastle School.
Fullarton Street, Irvine
(NAC) 
62 units
Site Start: Early 2025
Expected Completion: 
Summer 2026
This project will deliver a mix of general needs, amenity, and wheelchair accommodation
on the former Irvine High Flats site.
464

Page 465

Page 30 
Project Timeline Site Information
King’s Arms, Irvine
(NAC)
6 units
Site Start: Early 2024
Expected Completion: 
Spring/ summer 2025
This project involves the regeneration of a prominent town centre building to deliver six
amenity flats.
Confidential Site 1
(Cairn) 
10 units
Site Start: Spring 2024
Expected Completion: 
Early 2025
This development will provide general needs, amenity, and wheelchair accommodation.
This site is currently confidential due to a requirement for planning consent and for
acquisition of land.
Confidential Site 3
(Cairn) 
4 units
Site Start: Spring 2025
Expected Completion: 
Spring 2026
This site has the capacity for 4 affordable, general needs homes.  This site is currently
confidential due to a requirement for planning consent and for acquisition of land. 
Bank Street, Irvine
(CHA)
16 units
Site Start: Spring 2025
Expected Completion: 
Spring 2026
This town centre regeneration project in Irvine was previously allocated for Riverside.
CHA is currently determining the viability of delivering 16 new homes for affordable rent
as Riverside are no longer able to progress the scheme.
Three Towns
Project Timeline Site Information
Afton Court,
Stevenston (NAC)
6 units
Site Start: Winter 2022
Completion: 24 July 2023
This town centre regeneration project delivered 6 amenity bungalows, recognising the
highly accessible nature of this location. Modular construction was utilised to reduce the
time on site and the impact of works on surrounding residents and businesses.  
James McFarlane,
Saltcoats (NAC)
19 units
Site Start: Early 2024
Expected Completion: 
Summer 2025
The site of the former James McFarlane school will provide general needs, amenity, and
homes suitable for wheelchair accommodation close to Ardrossan town centre. 
James Reid, Saltcoats
(NAC)
47 units
Site Start: Early 2024
Expected Completion: 
Summer 2025
The site of the former James Reid school and the former Focus Centre will provide general
needs, amenity, and wheelchair accommodation. 
Glebe Place, Saltcoats
(NAC)
8 units
Site Start: Spring 2027
Expected Completion: 
Winter 2028
This regeneration project which includes the demolition of low demand flats can
accommodate approximately 8 new affordable homes close to Saltcoats town centre.  
Regeneration Project
1d, Ardrossan (NAC)
36 units
Site Start: Autumn 2025
Expected Completion: 
Spring 2027
This project provides a regeneration opportunity for 36 affordable homes, comprising
general needs, amenity, and wheelchair accommodation. 
465

Page 466

Page 31 
Project Timeline Site Information
Nursery Place (Regen
1e), Ardrossan (NAC)
6 units
Site Start: Spring 2026
Expected Completion: 
Spring 2027
This regeneration opportunity can accommodate approximately 6 new affordable homes. 
Grange Court,
Stevenston (NAC)
6 units
Site Start: Spring 2026
Expected Completion: 
Spring 2027
This regeneration opportunity can accommodate approximately 6 new affordable homes. 
Sharphill Phase 5,
Saltcoats (CHA)
100 units
Site Start: Autumn 2027
Expected Completion: Spring
2029
The next phase of the Sharphill site will deliver an additional 100 new homes, providing a
mix of general needs, amenity, and wheelchair user homes. 
Green Street, Saltcoats
(CHA)
24 units
Site Start: March 2022
Expected Completion: 
28 August 2023
The 24 new amenity homes developed in Saltcoats town centre were completed during
August 2023. 
Garven Road,
Stevenston (CHA)
20 units
Site Start: Autumn 2023
Expected Completion: 
Autumn 2024
This site was formerly known as Confidential Site 8 and has capacity to deliver 20 new
homes.
Confidential Site 10,
Ardrossan (CHA) 
50 units
Site Start: Spring 2026
Expected Completion: 
Autumn 2027
This project has capacity for up to 50 homes and is confidential until site feasibility can
be confirmed. 
Parkend Gardens,
Saltcoats (Link)
12 units
Site Start: Early 2024
Expected Completion: 
Early 2025
This development is in close proximity to Saltcoats town centre and adjacent to North
Ayrshire Council’s new development at Kyleshill Court, Saltcoats. It will deliver a mix of
general needs, amenity and wheelchair accommodation.
North Coast
Project Timeline Site Information
Former Largs Police
Station (NAC)
12 units
Site Start: 29 August 2022
Completion: 
18 September 2023
Work completed during September 2023 at the former Largs Police Station site delivering
12 amenity flats in the high demand, town centre, location. 
466

Page 467

Page 32 
Garnock Valley
Project Timeline Site Information
Former Garnock
Academy, Kilbirnie (NAC)
50 units
Site Start: Early 2024
Expected Completion: 
Winter 2025
The site of the former Garnock Academy will see the development of a mixture of general
needs homes, amenity bungalows and homes suitable for wheelchair users. 
Laburnum Avenue, Beith
(NAC)
7 units
Site Start: Early 2024
Expected Completion: 
Early 2025
This development will regenerate low demand flatted accommodation to deliver 7 new
affordable homes in Beith.  
Newhouse Drive,
Kilbirnie (NAC)
7 units
Site Start: Early 2024
Expected Completion: 
Early 2025
This development will regenerate low demand flatted accommodation to deliver 7 new
affordable homes in Kilbirnie.  
Arran
Project Timeline Site Information
Springbank, Brodick
(Trust HA)
26 units
Site Start: Early 2025
Expected Completion: 
Winter 2027
Trust Housing Association are exploring the viability of developing 26 homes at this
Brodick site. This site was formerly known as Confidential Site 4. 
Locality to be confirmed
Project Timeline Site Information
Unallocated
Regeneration Block (NAC)
15 units
Site Start: Autumn 2025
Expected Completion: 
Autumn 2027
This involves the regeneration of 15 properties to deliver a mix of general needs, amenity
bungalows and homes suitable for wheelchair users. The locations for these projects have
still to be finalised. 
Regeneration Project 3
(Riverside)
30 units
Site Start: Spring 2026
Expected Completion: 
Spring 2029
This project involves the regeneration of 30 properties to deliver a mix of general needs
houses, amenity properties and homes suitable for wheelchair users. The location has still
to be finalised. 
Unallocated CHA Block
(CHA)
92 units
Site Start: Spring 2025
Expected Completion:
Winter 2026 
The 92 units have been allocated within the SHIP to replace Confidential Sites 9 and 11
which were not viable. This will provide CHA with capacity for future development as the
association identifies suitable sites.
467

Page 468

Page 33 
Progress update
The Council has made a commitment to develop 1,625 new homes by 2028. Good progress has been made towards achieving this target,
with 831 new Council homes built as at 31 March 2023. The tables below detail the Council and its partners progress to date (excluding
sites which are noted for completion during 2023/24 within the Strategic Housing Investment Plan 2019 – 2024). 
Locality Pre 2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Total
Arran 56 0 0 0 0 34 0 90
Garnock Valley 24 0 0 49 0 0 0 73
Irvine 250 0 111 0 83 0 77 521
Kilwinning 68 64 0 0 0 151 0 283
North Coast 85 26 58 0 141 29 0 339
Three Towns 84 126 0 28 105 16 0 359
Total Units 567 216 169 77 329 230 77 1,665 
New supply by house type Units %
General needs 934 56.1%
Amenity housing 283 17.0%
Sheltered housing 223 13.4%
Supported accommodation 62 3.7%
Wheelchair user 85 5.1%
Ground floor living (wheelchair user) 45 2.7%
Other adapted 10 0.6%
Other 7 0.4%
New Supply Shared Equity (NSSE) 16 1%
Total 1,665 100% 
It should be noted that 50 of the amenity, sheltered and supported accommodation units detailed above are suitable for wheelchair users.
468

Page 469

Page 34 
Completed North Ayrshire
Council projects Locality
General Needs
Amenity
Sheltered
Supported
W
heelchair User
Bungalow
Ground Floor
Living
Other Total
Units
Completion
year
Copeland Crescent, Millport North Coast   11     1     12 2013/14
Redstone Avenue, Kilwinning Kilwinning 37 3     2 4   46 2014/15
John Galt PS, Irvine Irvine 64 10     6     80 2014/15
Stevenston Institute, Largs North Coast   11           11 2015/16
Dickson Drive, Irvine (Phase 1) Irvine 6 2           8 2015/16
Kiln Court, Irvine Irvine     16         16 2015/16
Montgomery Court, Kilbirnie Garnock Valley   8 16         24 2016/17
Fencedyke, Irvine Irvine 19 10     3 3   35 2017/18
Glencairn House, Stevenston Three Towns     28         28 2018/19
Canal Court, Saltcoats Three Towns     36         36 2018/19
Ardrossan Road, Seamill North Coast 25 5     1     31 2019/20
Dickson Drive, Irvine (Phase 2) Irvine 14 3     4 3   24 2019/20
Watt Court & Former Dalry P.S. Garnock Valley   8 22 15     4 49 2020/21
Dalrymple Place, Irvine Irvine     24   9     33 2021/22
St Beya, Cumbrae North Coast 3 9     3 3   18 2021/22
Springvale, Saltcoats Three Towns 6 2     2 4   14 2021/22
Flatt Road, Largs North Coast 49 16 28 22 5 2 1 123 2021/22
Former Towerlands P.S., Irvine Irvine 20 12     5 13   50 2021/22
Brathwic Terrace, Arran Arran 17 8     2 7   34 2022/23
St Michael's Wynd, Kilwinning Kilwinning 34 2 24 10 2 6 1 79 2022/23
St Colm's Place, Largs North Coast     29         29 2022/23
Caley Court, Stevenston Three Towns       15     1 16 2022/23
Total   294 120 223 62 45 45 7 796  
469

Page 470

Page 35 
Completed registered social landlord projects Locality
General
needs
Amenity
W
heelchair
Other
adapted
NSSE Total
units
Completion
Year
Flatt Farm, Largs (CHA) North Coast 16 10       26 2013/14
Vineburgh Phase 3, Irvine (CHA) Irvine 43 10     10 63 2013/14
Jetty Road, Fairlie (CHA) North Coast 10 3       13 2014/15
Benlister Road, Lamlash (Riverside) Arran 50       6 56 2014/15
Vineburgh Phase 4, Irvine (CHA) Irvine 41 6 1     48 2014/15
Pennyburn (Regeneration new build) (Riverside) Kilwinning 21   1     22 2015/16
Waterside Street, Largs (CHA) North Coast   12       12 2015/16
Seamore Street, Largs (CHA) North Coast 8 3       11 2016/17
Ardrossan Harbour Phase 1 (CHA) Three Towns 55 13 2     70 2017/18
New Street, Stevenston (CHA) Three Towns 7 7       14 2017/18
Nelson Street, Largs (CHA) North Coast 7 5 2     14 2018/19
Corsehillhead, Kilwinning (CHA) Kilwinning 57 5 2     64 2018/19
Ardrossan Harbour Phase 2 (CHA) Three Towns 2 4 4     10 2018/19
Sharphill Phase 3, Saltcoats (CHA) Three Towns 19 3 2     24 2018/19
Stanley P.S., Ardrossan (CHA) Three Towns 24 2 2     28 2018/19
Victoria Hotel, Largs (CHA) North Coast   12       12 2018/19
Balnagowan, Skelmorlie (CHA) North Coast 25   2     27  2019/20 
Tarryholm Phase 1, Irvine (Riverside) Irvine 61 14 2 10   87 2019/20
Ardoch Court, Stevenston (CHA) Three Towns 26   2     28  2020/21 
Corrie Crescent (Charitable Bond) (CHA) Three Towns 12 1       13 2021/22
Glebe, Saltcoats (CHA) Three Towns     2     2 2021/22
Sharphill Phase 4, Saltcoats (CHA) Three Towns 65 5 6     76 2021/22
West Byrehill, Kilwinning (CHA) Kilwinning 59 8 5     72  2022/23 
Tarryholm Phase 2, Irvine (Riverside) Irvine 32 40 5     77 2023/24
Total   640 163 40 10 16 869  
470

Page 471

Page 36 
471

Page 472

Official‐Protect#
Appendix 1 SHIP 2024‐2029
Pre 2024/25
2024/25
2025/26
2026/27
2027/28
2028/29
2023/24
2024/25
2025/26
2026/27
2027/28
2028/29
General
Needs
Am
enity
Supported
W
heelchair
Ground
Floor
Living
Sheltered
Harbourside Irv NAC 71 New Build 26 Oct 20 12 Apr 23 2020/21 71 71 - 24 11 4 4 28 - - - - - - - -
Largs Police Station (Redev 13) Lrgs NAC 12 New Build 29 Aug 22 30 Sep 23 2022/23 12 12 - 12 - - - - - - - -
Afton Court (Redev 6a) Stev NAC 6 New Build 09 Jan 23 24 Jul 23 2022/23 6 6 - 6 - - - - - - - -
2nd Hand & Empty Home Buy Backs ! NAC 65 Buy Back 01 Apr 23 31 Mar 28 2023/24 5 15 15 15 15 5 15 15 15 15 £2,600,000 65 - - £200,000 £600,000 £600,000 £600,000 £600,000 £0
Garnock Academy (Redev 9) Kilb NAC 50 New Build 08 Jan 24 30 Oct 25 2023/24 50 50 £5,306,966 28 13 2 7 £473,397 £56,780 £1,110,750 £2,000,000 £1,666,039 £0 £0 £0
King's Arms (Regen 1c) Irv NAC 6 New Build 08 Jan 24 01 May 25 2023/24 6 6 £543,319 6 £0 £288,868 £82,000 £172,451 £0 £0 £0 £0
Corsehillhead Kilw NAC 7 New Build 01 Feb 24 01 Feb 25 2023/24 7 7 £711,516 5 2 £130,500 £72,154 £350,000 £158,862 £0 £0 £0 £0
James McFarlane (Redev 8a) Ardr NAC 19 New Build 01 Feb 24 01 Jun 25 2023/24 19 19 £1,993,029 10 4 1 4 £233,022 £58,347 £450,000 £1,251,659 £0 £0 £0 £0
Stanecastle (Redev 11a) Irv NAC 31 New Build 01 Feb 24 01 Aug 25 2023/24 31 31 £3,204,355 17 7 3 4 £493,411 £82,132 £450,000 £1,500,000 £678,812 £0 £0 £0
Laburnum Avenue (Regen Project 1a) Beith NAC 7 New Build 01 Feb 24 31 Jan 25 2023/24 7 7 £699,468 4 3 £0 £0 £125,000 £574,468 £0 £0 £0 £0
Newhouse Drive (Regen Project 1b) Kilb NAC 7 New Build 01 Feb 24 31 Jan 25 2023/24 7 7 £699,468 4 3 £0 £0 £125,000 £574,468 £0 £0 £0 £0
James Reid & FC (Redev 8b) Salt NAC 47 New Build 01 Feb 24 01 Aug 25 2023/24 47 47 £4,858,216 26 11 4 6 £602,999 £226,748 £1,200,000 £2,200,000 £628,468 £0 £0 £0
Ayrshire Central (Redev 12) Irv NAC 202 New Build 01 Apr 24 01 Apr 27 2023/24 202 202 £20,010,798 65 85 26 26 £2,252,936 £0 £600,000 £5,628,339 £6,529,523 £5,000,000 £0 £0
Nelson Street Lrgs NAC 3 Refurb 01 Jul 24 01 Apr 26 2024/25 3 3 £171,000 3 £0 £0 £0 £71,000 £100,000 £0 £0 £0
Montgomerie Park, Irvine Irv NAC 189 New Build 01 Aug 24 01 Dec 27 2024/25 189 189 £19,698,882 111 39 19 20 £4,579,235 £0 £780,000 £3,720,000 £6,620,200 £3,999,447 £0 £0
Bourtreehill Village (Redev 7) Irv NAC 32 New Build 01 Oct 24 30 Oct 28 2024/25 32 32 £3,409,353 24 6 1 1 £0 £0 £0 £0 £307,722 £500,000 £2,000,000 £601,631
Refurbishment Project 8 Irv NAC 2 Refurb 01 Nov 24 01 Nov 26 2024/25 2 2 £114,000 2 £0 £0 £0 £14,000 £100,000 £0 £0 £0
Fullarton Street (HF) Irv NAC 62 New Build 06 Jan 25 01 Jun 26 2024/25 62 62 £6,355,354 40 15 2 5 £0 £0 £0 £1,000,000 £2,855,354 £2,500,000 £0 £0
Regeneration Project 1d Ardr NAC 36 New Build 01 Sep 25 30 Apr 27 2025/26 36 36 £3,983,812 20 5 11 £0 £0 £0 £0 £983,812 £3,000,000 £0 £0
Unallocated Regeneration Block TBA NAC 15 New Build 01 Sep 25 30 Sep 27 2025/26 15 15 £1,594,478 10 3 1 1 £0 £0 £0 £0 £50,000 £1,000,000 £544,478 £0
Nursery Place (Regen 1e) Ardr NAC 6 New Build 01 Apr 26 30 Apr 27 2026/27 6 6 £635,113 4 2 £0 £0 £0 £0 £0 £325,348 £309,765 £0
Grange Court (Regen) Stev NAC 6 New Build 01 Apr 26 30 Apr 27 2026/27 6 6 £644,576 6 £0 £0 £0 £0 £0 £325,348 £319,228 £0
Glebe Place Salt NAC 8 New Build 01 Apr 27 30 Nov 28 2027/28 8 8 £836,109 5 3 £0 £0 £0 £0 £0 £0 £422,365 £413,744
Confidential Site 1 ₴ Irv Cairn 10 New Build 01 Mar 24 01 Jan 25 2023/24 10 10 £1,117,945 6 2 2 £0 £0 £100,000 £1,017,945 £0 £0 £0 £0
Cairn Buy Back Programme ! Cairn 2 Buy Back 01 Apr 24 31 Mar 26 2024/25 2 2 £85,000 2 £0 £0 £0 £85,000 £0 £0 £0 £0
Confidential Site 3 Kilw Cairn 4 New Build 01 Apr 25 01 Apr 26 2025/26 4 4 £407,000 4 £0 £0 £0 £0 £407,000 £0 £0 £0
Green Street (Confidential Site 7) Salt CHA 24 New Build 21 Mar 22 28 Aug 23 2021/22 24 24 £2,065,436 23 1 £418,366 £1,647,070 £0 £0 £0 £0 £0 £0
Garven Road (Confidential Site 8) Stev CHA 20 New Build 01 Sep 23 01 Sep 24 2023/24 20 20 £3,200,000 18 1 1 £0 £0 £3,200,000 £0 £0 £0 £0 £0
CHA Buy Back Programme ! CHA 6 Buy Back 01 Nov 23 31 Mar 29 2023/24 6 6 £240,000 6 £0 £0 £40,000 £40,000 £40,000 £40,000 £40,000 £40,000
Bank Street (111) Irv CHA 16 New Build 01 Apr 25 30 Apr 26 2025/26 16 16 £2,560,000 16 £0 £0 £0 £0 £1,152,000 £1,408,000 £0 £0
Unallocated CHA Block TBA CHA 92 New Build 01 Apr 25 01 Dec 26 2025/26 92 92 £14,720,000 64 23 5 £0 £0 £0 £0 £3,503,360 £6,506,240 £4,710,400 £0
Confidential Site 10 Ardr CHA 50 New Build 01 Apr 26 31 Oct 27 2026/27 50 50 £8,000,000 45 3 2 £0 £0 £0 £0 £0 £5,000,000 £3,000,000 £0
Sharphill (Ph 5) Salt CHA 100 New Build 01 Oct 27 01 Mar 29 2027/28 100 100 £14,800,000 78 17 5 £1,277,000 £0 £0 £0 £0 £0 £6,400,000 £7,123,000
Harbour Road Irv CHA - New Build - - - - - - - - - - - -
Parkend Gardens Salt Link 12 New Build 10 Jan 24 10 Jan 25 2023/24 12 12 £1,909,931 8 3 1 £83,625 £0 £500,000 £1,326,306 £0 £0 £0 £0
Riverside Buy Back Programme ! Riverside 15 Buy Back 01 Apr 23 01 Mar 27 2023/24 15 15 £1,367,730 15 £0 £0 £280,000 £367,730 £400,000 £320,000 £0 £0
Regeneration Project 3 TBA Riverside 30 New Build 01 Apr 26 01 Mar 29 2026/27 30 30 £2,833,680 24 3 1 2 £0 £0 £0 £0 £0 £1,000,000 £1,500,000 £333,680
Trust Buy Back Programme Arran Trust 6 Buy Back 01 Nov 23 31 Mar 29 2023/24 6 6 £600,000 6 £0 £0 £200,000 £100,000 £100,000 £100,000 £100,000 £0
Springbank (Confidential site 4) ₳  Arran Trust 26 New Build 01 Jan 25 01 Dec 27 2024/25 26 26 £5,000,000 26 £0 £0 £0 £750,000 £4,250,000 £0 £0 £0
1302 361 533 178 107 123 0 118 78 170 209 545 182 £136,976,532 791 311 0 81 91 28 £10,544,492 £2,432,099 £9,792,750 £23,152,227 £30,972,290 £31,624,383 £19,946,236 £8,512,055
SHIP 2023 - 2028
New addition to SHIP
Confidential Sites
Sites removed from SHIP 2024 - 2029
Sites completing from SHIP 2023 - 2028
₳ The access point for this development should be agreed with NAC Roads as the existing road network may not cope with the additional units
₴ This site is located on Open Ground and can only progress subject to a Planning Application for change of use
SHIP Spend
2027/28
SHIP Spend
2028/29
Scottish
Government
Grant
Units Type Estimated
Site Start
SHIP
Approval
Year
Site Starts Site Completions
Estimated
Practical
Completion
SHIP Spend
2026/27
House Types
Pre 2022/23
Spend
SHIP Spend
2022/23
SHIP Spend
2023/24
SHIP Spend
2024/25
SHIP Spend
2025/26Site Town Developer
#Official‐Protect
472

Page 473

NORTH AYRSHIRE COUNCIL  
7 November 2023 
Cabinet
Title: Former St Mary’s Primary School, Largs – SHIP social
housing development proposal
Purpose: To seek approval for the inclusion of the former St Mary’s
Primary School site, Largs as a 26-unit Council social housing
development in the North Ayrshire SHIP 2024-29 
Recommendation: It is proposed that Cabinet:
(i) notes the challenges encountered in delivering the Home
Ownership Made Easy (HOME) pathfinder project on the site of
the former St Mary’s Primary School, Largs since its approval by
Cabinet in December 2018, and agrees to no longer progress
this; (ii) notes the discussions which have taken place with
Scottish Government in recent months to identify alternative
affordable housing options for the site; (iii) approves the sale of
the site by the Council’s General Fund to the Housing Revenue
Account at the indicative value, pending district valuer valuation
and subject to any abnormal costs; and (iv) approves the
inclusion of the site as a 26-unit Council social housing
development in the North Ayrshire SHIP 2024-29. 
1. Executive Summary 
1.1 Following approval of the project concept by Cabinet on 11 December 2018, officers
worked with Scottish Futures Trust (SFT) to develop an innovative pathfinder initiative
entitled ‘HOME’ (Home Ownership Made Easy) on the site of the former St Mary’s
Primary School in Largs. 
1.2 The HOME project is designed to help people who are unable to access a housing
solution which meets their needs in either the private or social rented sectors.
Occupants pay an up-front investment to access a brand-new home, which is managed
and maintained by the Council. Occupants then pay an ongoing monthly payment,
which should be lower than the equivalent private market rent or typical mortgage. The
occupancy payments cover the debt repayments and maintenance and management
costs in full, so that the model is financially sustainable. 
1.3 The HOME project ran into delays during the period 2020 - 2022, primarily due to the
COVID-19 pandemic and also the enforcement of Scottish Water policies affecting the
site. Consequently, the project team developed a revised draft scheme, which Scottish
Water were satisfied with, and which took the development down from 33 units to 26
units. Conditional approval was granted for the planning application in August 2021. All
other statutory consents are in place.  
Agenda Item 16
473

Page 474

1.4 Due to increasing construction costs since project inception, the HOME project was
assessed in early 2023 as not being financially viable. The Council’s Legal Services
team also raised concerns about the ability to pursue non-payment of occupancy fees
through a standard security, which resulted in the Scottish Futures Trust seeking their
own external legal advice. Their advisors confirmed Legal Services’ view. 
1.5 Following the financial and legal assessments, officers have been investigating
alternative options to enable affordable housing development to be taken forward on
the site, recognising that planning and other statutory approvals are already in place. 
1.6 Discussions have been taking place with Scottish Government officials since early
2023, leading to a business case being presented to Scottish Government in June 2023
seeking sufficient funding to enable the site to be developed for social housing – initially
for people seeking refuge from the war in Ukraine and thereafter for allocation through
the North Ayrshire Housing Register - without impacting on the Council’s HRA 30-year
Business Plan and associated rent levels. 
1.7 Following extensive negotiations, Scottish Government have confirmed their willingness
to fund the project through the Affordable Housing Supply Programme. The £4.0m grant
offered is significantly above their normal benchmark level and will enable the project to
be delivered and the homes maintained using the rents receivable from the 26 new
homes. 
1.8 Scottish Government have advised that there are no conditions on the funding which
require the properties to be allocated to Ukrainian Displaced People, although they
have advised that it would be helpful to the Ukraine programme if some support was
provided. 
1.9 The proposed development supports the Council’s stated Local Housing Strategy
priority of providing high quality homes for affordable rent, with 12 of the 26 (46%)
homes suitable for wheelchair users. This compares very favourably to the North
Ayrshire Local Housing Strategy all-tenure target of 10%. 
1.10 Cabinet is asked to note the deliverability challenges encountered in delivering the
HOME pathfinder project on the site of the former St Mary’s Primary School, Largs
since its approval by Cabinet in December 2018 and approve the inclusion of the site as
a 26-unit Council social housing development in the North Ayrshire SHIP 2024-29. 
2. Background  
2.1 On 11 December 2018 Cabinet agreed to the implementation of a new housing delivery
model, on the site of the former St Mary’s Primary School in Largs, to provide an
affordable housing solution for those facing challenges securing access to private or
social rented housing. 
2.2 The HOME project is designed to help people who are unable to access a housing
solution which meets their needs in either the private or social rented sectors.
Occupants pay an up-front investment to access a brand-new home, which is managed
and maintained by the Council. Occupants then pay an ongoing monthly payment,
which is lower than the equivalent private market rent or typical mortgage. The
occupancy payments cover the debt repayments and maintenance and management
costs in full, so that the model is financially sustainable.
474

Page 475

2.3 The two stage HOME Project consultation process undertaken during 2018 comprised
of a series of focus groups and a survey which received 698 responses.   Whilst the
focus of the consultation was to determine the housing needs and aspirations of local
people in order to inform the feasibility of the HOME Project model, a significant
proportion of respondents advised that what was most important was affordable
housing in the right location. 
2.4 Following the consultation, the Council received 289 expressions of interest in the
HOME Project. Should Cabinet approve the development of social rented housing on
this site, Council Officers will contact all interested parties to inform them of this. 
2.5 The HOME project ran into delays during the period 2020 - 2022, primarily related to
the COVID-19 pandemic which resulted in the focus of the Housing Strategy and
Development team being on projects already on site. 
2.6 The project also suffered significant delays during 2020/21 due to the enforcement of
Scottish Water policies, in which there had previously been some flexibility.
Consequently, the project team developed a revised draft scheme, which Scottish
Water were satisfied with, and which took the development down from 33 units to 26
units. Conditional approval was granted for the planning application in August 2021. All
other statutory consents are in place. 
2.7 Due to increasing construction costs since project inception, the HOME project was
assessed in early 2023 as not being financially viable; the proposed monthly occupancy
fees require to be significantly higher than originally anticipated, and also significantly
higher than the Local Housing Allowance (LHA). 
2.8 The Council’s Legal Services team also raised concerns about the ability to pursue non-
payment of occupancy fees through a standard security, which resulted in the Scottish
Futures Trust seeking their own external legal advice. Their advisors confirmed Legal
Services’ view. The Scottish Government subsequently confirmed it does not recognise
the HOME model presented to them by Scottish Futures Trust (SFT) as a shared
ownership scheme. 
2.9 Following the financial and legal assessments, Council officers have been investigating
alternative options to enable affordable housing development on the site to be taken
forward, recognising that planning and other statutory approvals are already in place. 
2.10 Discussions have been taking place with Scottish Government officials since early
2023, leading to a business case being presented to Scottish Government in June 2023
seeking sufficient funding to enable the site to be developed for social housing – initially
for people seeking refuge from the war in Ukraine and thereafter for allocation through
the North Ayrshire Housing Register - without impacting on the Council’s HRA 30-year
Business Plan and associated rent levels. 
2.11 The business case confirmed that the site is shovel ready, with planning permission
granted, designs complete and a contractor in place through Hub Southwest. It also
advised that the works on site could commence within a very short time following
Scottish Government funding approval being obtained and the project is anticipated to
take one year to complete.  
475

Page 476

2.12 It was stressed that the site cannot be added to the current North Ayrshire SHIP without
the full additional Scottish Government funding requested being provided, as the
Council’s HRA 30-year business plan is already fully financially committed. 
2.13 It was also highlighted that Largs has already benefitted from a significant allocation of
new build homes at various sites through the SHIP to date so, should additional North
Ayrshire Housing Revenue Account funding become available, this is likely to be
allocated to other priority areas. 
2.14 Following extensive negotiations and technical assessment of the Council’s proposal,
Scottish Government have confirmed their willingness to fund the project through their
Affordable Housing Supply Programme, recognising the shovel-ready status of the
project and its contribution to increasing local and national social housing supply. 
2.15 The £4.0m grant offered is significantly above the normal benchmark level and will
enable the project to be delivered and the 26 homes maintained using the rents
receivable over the 50-year period modelled in the business case.   
2.16 Scottish Government have advised that there are no conditions on the funding which
require the properties to be allocated to Ukrainian Displaced People, although they
have advised that it would be helpful to the Ukraine long-term resettlement programme
if some support was provided. 
2.17 Should Cabinet accept that the HOME pathfinder project no longer progresses due to
the challenges encountered; and agree for the site to be used as a social housing
development, then it is proposed that this project be incorporated within the SHIP 2024
– 2029 with no impact on the 30-year HRA business plan or tenants rent levels. 
2.18 The approved site mix comprises:
• 8 x 2-bed general needs houses
• 8 x 2-bed amenity flats
• 4 x 2-bed amenity bungalows
• 6 x 3-bed general needs houses 
2.19 The proposed development supports the Council’s stated Local Housing Strategy
priority of providing high quality homes for affordable rent, with 12 of the 26 (46%)
homes suitable for wheelchair users. This compares very favourably to the North
Ayrshire all-tenure target of 10%.   
2.20 As of 30 September 2023, the North Ayrshire Housing register had 1252 housing
applicants registered for the Largs area.  Of these, 547 are deemed to be in housing
need, with 99 requiring accessible housing suitable for wheelchair users and 331
required general needs housing.  
476

Page 477

2.21 The land of the former St Mary’s site in Largs currently sits within the Council’s general
fund. The site was valued in March 2023 by external valuers, Graham and Sibbald, on a
Market Value basis at £300,000 gross. In accordance with previous transactions
between the HRA and General Fund, a refreshed valuation will be instructed as a
matter of urgency by the District Valuer Services on Market Value with Special
Assumptions given to the proposed development. 
2.22 To avoid delays to the proposed project, the HRA will transfer £300,000 to the General
Fund based on the current site valuation.  The relevant adjustments including abnormal
costs will be made following completion of the refreshed valuation by the District Valuer
Services. 
3. Proposals 
3.1 It is proposed that Cabinet 
(i) notes the challenges encountered in delivering the Home Ownership Made Easy
(HOME) pathfinder project on the site of the former St Mary’s Primary School,
Largs since its approval by Cabinet in December 2018; and agrees to no longer
progress this;
(ii) notes the discussions which have taken place with Scottish Government in
recent months to identify alternative affordable housing options for the site; 
(iii) approves the sale of the site by the Council’s General Fund to the Housing
Revenue Account at the indicative value, pending district valuer valuation and
subject to any abnormal costs; and 
(iv) approves the inclusion of the site as a 26-unit Council social housing
development in the North Ayrshire SHIP 2024-29. 
4. Implications/Socio-economic Duty
Financial
4.1 The total cost to build the 26 new houses on the St Marys site including the acquisition
of land is £6.4m.  Due to the Scottish Government £4.0m grant being significantly
above benchmark, the project can be delivered, and the 26 homes maintained using the
rents receivable over the 50-year period modelled in the business case. 
4.2 To avoid delays and pending Cabinet approval, the HRA will transfer to the General
Fund the indicative site value of £300,000 and the relevant adjustments will be made
following completion of the refreshed valuation by the District Valuer Services.  Agreed
abnormal costs will be deducted from the updated land valuation. 
Human Resources 
4.3 None  
477

Page 478

Legal 
4.4 The Town & Country Planning (General Permitted Development) (Scotland) Order
1992, Schedule 1, Part 12, Class 33, as amended, enables local authorities to
undertake works, within their district, for the erection of dwellings so long as the
development conforms with the Local Development Plan. The Council’s House
Building Protocol governs the design and consultation processes for such
development to ensure that appropriate levels of design scrutiny and consultation are
maintained.  In 2019, it was agreed that all future Council housing developments
progressed as permitted development will be required to obtain a ‘Certificate of
Lawfulness’ from the Council’s Planning Service. This will certify that each
development site has been considered against the full terms of the adopted Local
Development Plan. 
Equality/Socio-economic 
4.4 The provision of 26 new social homes for social rent on the St Mary’s site will have a
positive impact on those who are seeking family and accessible social housing in the
Largs area. 
Climate Change and Carbon 
4.5 The new homes will have a low environmental impact, will reduce fuel use and
associated fuel costs for tenants. The proposed housing development will be
delivered in accordance with the Building Standards regulations for energy efficiency.
The homes will be connected to the communal biomass boiler at the adjacent Flatt
Road site, have solar photovoltaic panels and EV charging points installed. New
housing is more energy efficient, better ventilated, and has higher levels of thermal
comfort, which supports improved health and well-being. 
Key Priorities 
4.6 The proposed development aligns with the Council Plan strategic priorities:
‘Wellbeing’; ‘Climate Change’; ‘A Sustainable Council’: and ‘Communities and Local
Democracy’.  It supports the ambitions of the Council’s Regeneration Delivery Plan to
drive forward development on strategic regeneration sites, including town centres.   
Community Wealth Building 
4.7 The proposal supports the Community Wealth Building strategy through effective use
of available land and property.  It also supports local businesses and generates
employment and training opportunities.  Achievement of this is through community
benefit clauses within development contracts and working in partnership with
Economic Development who support local construction and supply chain companies
to bid for this work.  
478

Page 479

5. Consultation 
5.1 The two stage HOME Project consultation process undertaken during 2018 comprised
of a series of focus groups and a survey which received 698 responses.   Whilst the
focus of the consultation was to determine the housing needs and aspirations of local
people in order to inform the feasibility of the HOME Project model, a significant
proportion of respondents advised that what was most important was affordable
housing in the right location.  Following this consultation 289 people have expressed an
interest in the HOME project. 
5.2 Consultation was also undertaken with SFT, Finance, Legal and Estates regarding the
HOME project since its inception. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Yvonne Baulk, Head of Housing and Public
Protection, on 01294 324542. 
Background Papers
HOME Cabinet Paper December 2018
479

Page 480

480

Page 481

NORTH AYRSHIRE COUNCIL 
07 November 2023 
Cabinet
Title: Council house buy-back programme to accommodate
Ukrainian Displaced People 
Purpose: To seek Cabinet approval to purchase up to 40 properties to
accommodate Ukrainian households for three years using
Scottish Government grant being made available. 
Recommendation: It is recommended that Cabinet: 
(i) Approves the purchase of up to 40 properties to be used
to accommodate Ukrainian households for three years;
and
(ii) Notes that the homes will be available for allocation to
other housing applicants thereafter. 
1. Executive Summary 
1.1 North Ayrshire Council officers have been working closely with Scottish Government
and COSLA since March 2022 to offer accommodation and sanctuary to people
displaced by the conflict in Ukraine. 
1.2 As at November 2023, the Council and Community Planning Partners had supported
185 Ukrainian displaced households (395 people) to settle in North Ayrshire across the
different sponsorship schemes.   
1.3 The uptake of visas has been significantly higher than originally anticipated and North
Ayrshire Council has now exhausted all housing solutions from existing stock to
accommodate Ukrainian Dispersed Persons (UDPs).   
1.4 The Scottish Government has recently taken the decision to close local hotel/ welcome
accommodation utilised to accommodate UDPs. 
1.5 North Ayrshire Council has been working with the Scottish Government, COSLA and
other local authorities to identify options to increase the supply of short, medium, and
longer-term accommodation for the use of UDPs. 
1.6 Following Scottish Government’s consideration of a business case prepared by North
Ayrshire Council officers, an opportunity has arisen for the Council to purchase up to 40
homes on the open market to accommodate UDPs for three years. The homes would
thereafter be available for allocation to applicants on the North Ayrshire Housing
Register. The net cost of the acquisitions will be met by Scottish Government.
Agenda Item 17
481

Page 482

2. Background 
2.1 The Council and CPP partners have worked closely with the Scottish Government and
COSLA since March 2022 to help Ukrainian displaced households settle in North
Ayrshire.   
2.2 As at 10 October  2023, 25,778 displaced people from Ukraine had arrived in Scotland.
The pace of arrivals has slowed, and in September 2023 there were approximately
3000 people in initial welcome accommodation across the country. 
2.3 The Council and Community Planning Partners have supported 185 Ukrainian
displaced households (395 people) to settle in North Ayrshire across the different
sponsorship schemes. 
2.4 Recognising that it is not the most suitable model of accommodation for people and is
not financially sustainable, the Scottish Government has taken the decision to
significantly reduce the use of hotel accommodation. 
2.5 The North Ayrshire Hub at Riverside Hotel in Irvine closed on 21 September 2023; the
remaining Ukrainian seven households were assisted to secure alternative
accommodation prior to its closure. 
2.6 There continues to be concerns across local government regarding the national
capacity to meet both the short and medium to long-term response to the Ukraine
crisis, alongside local housing needs, with pressures on accommodation and support
services significant. 
2.7 Given the current pressure on housing provision and the homelessness service, North
Ayrshire Council has exhausted the use of existing stock to accommodate UDPs.     
2.8 The Council has the capacity to increase its current buyback programme, which if
approved would increase accommodation available for allocation to UDPs (under a
Scottish Secured Tenancy (SST) by 40 properties for a period of three years.  When
they are no longer utilised for UDPs the properties would be allocated as mainstream
housing in line with the North Ayrshire allocation policy, assisting to meet local housing
need. 
2.9 In June 2023  a business case was submitted to the Scottish Government’s More
Homes Division and the Warm Scottish Welcome Directorate, proposing that they
provide funding over and above the benchmark grant to enable the buyback of
properties in North Ayrshire for UDPs.   
2.10 There would be no net cost to North Ayrshire Council. The funding shortfall, after
consideration of grant funding and rental income, future maintenance and borrowing
costs, would be met by the Scottish Government, recognising the project supports cost
avoidance by the Warm Scottish Welcome Directorate. 
2.11 The Council would primarily seek to purchase ex-local authority houses, and an initial
review of the market has confirmed that sufficient suitable properties are likely to be
available for sale by 31 March 2024.
482

Page 483

2.12 The Council’s Refugee Support Team will continue to work with Community Planning
Partners, through the Refugee Taskforce, to resettle new Ukrainian families into North
Ayrshire; facilitating access to essential services including health, education, training
and employment. 
2.13 The benefits associated with increasing the buyback programme are summarised
below: 
- It assists with the current housing crisis in relation to UDPs and provides a longer-
term accommodation solution, with agreement made for a period of 3 years
- It provides a better and joined-up use of public funds
- It increases available social housing as any voids created due to the departure of
UDPs in the longer-term would become available for general allocation 
2.14 On 24 August 2023, the Scottish Government More Homes Division’s Head of Ukraine
Longer Term Accommodation wrote to the Head of Housing and Public Protection
detailing the intention to progress the proposal. The terms of the agreement are as
follows: 
- The grant funding should be used to support the purchase of up to 40 off-the-shelf
units 
- All homes should be purchased at or below market value (as established by the
District Valuer or other suitably qualified property surveyor), contribute to the
Scottish Government’s affordable housing target, and be available for the purpose
of housing UDPs for up to 3 years, at which point they will revert to mainstream
social housing stock in North Ayrshire
- Grant funding per property cannot exceed the purchase price plus costs of
improvement works of any individual property
- Homes will be a range of 1, 2 and 3 bed properties
- Purchases will be completed and grant drawn down by 31 March 2024 – and given
the urgent need for housing this will be accelerated where possible
- This investment will not displace other parts of the agreed North Ayrshire Strategic
Housing Investment Plan. 
2.15 On 5 October 2023, the Scottish Government More Homes Division confirmed that the
buyback programme had been approved by the Housing Minister. 
3. Proposals 
3.1 It is proposed that Cabinet: 
(i) Approves the purchase of up to 40 properties to be used to accommodate
Ukrainian households for three years; and
(ii) Notes that the homes will be available for allocation to other housing applicants
thereafter.  
483

Page 484

4. Implications/Socio-economic Duty
Financial
4.1 The Scottish Government will provide funding to buy 40 houses on the open market. In
line with the business case presented to Scottish Government, this will be used to
bridge the funding gap between acquisition, improvement and maintenance costs and
future rental income. 
Human Resources 
4.2 It is anticipated that the management of the buy-back process through to resettlement
of UDPs will be met within existing Council resources. Should additional conveyancing
support be required, this will be procured through existing frameworks.  
Legal 
4.3 None 
Equality/Socio-economic 
4.4 The purchase of 40 units of social rented housing will increase the level of Council
stock available for relet to North Ayrshire Housing Register applicants when they are
no longer required for UDPs. 
Climate Change and Carbon 
4.5 The properties purchased will be brought up to the Scottish Housing Quality Standard,
ensuring that they are energy efficient, and in doing so minimising carbon emissions
which will assist our contribution to Scotland's net zero emissions targets. 
Key Priorities 
4.6 The matters referred to in this report support the delivery of all four Council Plan
priorities: Wellbeing; Communities and Local Democracy; Climate Change; and a
Sustainable Council. 
Community Wealth Building 
4.7 The Council’s contractors are required to participate in the Council’s Community       
Benefits Programme, which contains targets for local training, employment and
community support.   
484

Page 485

5 Consultation 
5.1 Council officers worked closely with Scottish Government to develop the proposals set
out in this report. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Janeine Barrett, Senior Manager (Homelessness
and Community Safety) janeinebarrett@north-ayrshire.gov.uk 01294-314600 
Background Papers
0
485

Page 486

486

Page 487

NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:  National Islands Plan Review consultation response 
Purpose: To provide an update on the Council’s engagement in the
consultation on the review of the National Islands Plan by the
Scottish Government and to seek approval for the proposed
consultation response. 
Recommendation: That Cabinet: 
a) Notes the Scottish Government’s consultation on the review
of the National Island Plan;
b) Approves the proposed consultation response provided at
Appendix 1; and
c) Notes the submission of separate consultation responses on
behalf of the Island Plan Steering Groups on both islands. 
1. Executive Summary 
1.1 A consultation to review the National Islands Plan (NIP) is required under section 6 of
the Islands (Scotland) Act 2018. The Scottish Government launched the consultation
on 18 July 2023 with responses being sought by 7 November 2023. 
1.2  The review aims to assess the impact of the NIP since its publication in 2019. This will
potentially inform a new NIP, to be published in 2025, if the consultation responses
evidence the requirement for this. Essentially, the NIP review consultation provides an
opportunity for island communities to highlight the issues they are currently facing and
ensure that these are directly reflected in the next iteration of the Plan. 
1.3  The proposed Council response to the consultation, for which this report seeks
approval, is provided at Appendix 1. Separate responses are being submitted on behalf
of the Island Plan Steering Groups on both islands. 
2. Background 
2.1 The National Islands Plan (NIP) was launched twelve weeks before the Covid-19
pandemic struck in March 2020. It was published before the UK’s exit from the EU, and
before the onset of the cost of living crisis. Combined with the wider impacts of Russia’s
invasion of Ukraine, these issues have had a significant impact on Scotland’s island
communities. 
Agenda Item 18
487

Page 488

2.2 The Act requires a review of the Plan within 5 years of initial publication. Given the
circumstances, the NIP review consultation is timely in providing the Scottish
Government, their partners and island communities with an opportunity to reflect on
changes in circumstance since 2019. 
2.3  In 2021, the Council commenced a three-year Islands Recovery and Renewal Pilot in
partnership with the Scottish Government and Highlands and Islands Enterprise. This
aims to support an inclusive and green economic recovery and renewal of North
Ayrshire’s island communities in line with their unique challenges and opportunities.
This pilot is strongly aligned to the delivery of the strategic objectives of the current NIP
and to Community Wealth Building (CWB) principles. 
2.4 Whilst developing the 10-year Local Island Plans during 2021/22, the Council sense
checked feedback previously gathered from 2019 onwards to ensure that the
challenges and main concerns for each island were still relevant and remain the
priorities of each island post-pandemic. Informed by Arran and Cumbrae’s extensive
input during the development of the NIP, the Local Island Plans reflect synergies with
all the Strategic Objectives of the NIP. They also take a distinct locality focus, ensuring
complementarity and avoiding overlap or duplication of other local and regional
activities, plans, strategies, and funding sources. 
2.5  A key focus for the pilot has been strengthening the partnership with our island
communities, island businesses, and wider stakeholders to facilitate and commence
delivery of the Local Island Plans to maximise the islands’ potential and improve
outcomes and benefits for our islanders. As these plans are implemented, they are
contributing to and delivering improved outcomes for the community, economic, and
environmental wellbeing of Arran and Cumbrae. 
2.6 The findings from Scottish Government consultation and any revised or new National
Islands Plan will require to be reflected in the current Local Island Plans, in due course.
The Scottish Government is seeking submissions by 7 November 2023. Following the
end of the consultation period, they will analyse the data gathered from both the online
consultation responses and engagement events to inform, if needed, the drafting of a
new NIP. 
2.7  The consultation is being carried out by the Scottish Government Islands team with
support from Scottish Islands Federation, delivering a series of virtual and face to face
engagements with island communities and stakeholders. An engagement workshop on
Cumbrae was held at Garrison House on Thursday 28 September with sixteen people
attending. A similar engagement workshop for Arran was originally scheduled for Friday
29 September but was postponed until 25 October due to ferry cancellations.   
2.8 The proposed response provided at Appendix One has been informed by the
experience of and feedback obtained through the pilot project. This includes feedback
through the North Coast Locality Partnership and Islands Plan Steering Group. Not all
questions within the consultation lend themselves to a local authority response as they
are more citizen focused. For these questions, a response has been recorded as not
applicable, or where appropriate, a brief comment provided. 
2.9 Through the islands pilot, Officers have supported the Scottish Islands Federation and
Scottish Government Islands team to encourage participation in the consultation. This
has included promoting participation in local workshops and completion of the review
online via the consultation portal. Awareness has been raised through the provision of
488

Page 489

information to island stakeholders including Community Councils, Locality Partnerships,
Local Island Plan Steering Groups, Elected Members and Council officers. Several
communication methods have been used including email, social media posts, posters,
and word of mouth. 
2.10 Separate responses have been prepared on behalf of the Island Plan Steering Groups
for both islands, for submission individually to the consultation, by the Chair of each
Group with support from the Senior Officer- Islands. These responses have been
informed by community feedback directly from island residents, enabling a full response
to the consultation questions. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the Scottish Government’s consultation on the review of the National Island
Plan;
b) Approves the proposed consultation response provided at Appendix 1; and
c) Notes the submission of separate consultation responses on behalf of the Island
Plan Steering Groups on both islands. 
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The NIP aims to work with islanders to contribute to the creation of a fairer, healthier,
happier nation for all of Scotland and supports the work of the group of Wellbeing
Economy Governments. 
Climate Change and Carbon 
4.5 Several strategic objectives of the NIP contribute to climate change and carbon and
align with the Council’s Environmental Climate Change and Sustainability Strategy.
These include to improve and promote environmental well-being and deal with
biosecurity; and to contribute to climate change mitigation and adaption and promote
clean, affordable and secure energy. 
Key Priorities 
4.6 The strategic objectives of the NIP align with and contribute to the priorities and key
activities of the Council Plan including supporting the delivery of Islands Plans. The
proposed consultation response will contribute to ensuring that the specific needs of
489

Page 490

our island communities continue to be addressed within the Plan. 
Community Wealth Building 
4.7 There are no direct implications for Community Wealth Building, however the Island
Recovery and Renewal pilot embeds CWB principles throughout its approach to island
development and as such, the proposed consultation response is informed by the
Council’s wider approach to CWB. 
5. Consultation 
5.1 Consultation has taken place with the Cabinet Member for Communities and Islands as
Chair of the Cumbrae Island Plan Steering Group. The proposed response has been
informed by the experience of and feedback obtained through the pilot project. This
includes feedback through the Locality Partnership and Islands Plan Steering Group. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Sarah Baird, Senior Officer- Islands, on 07919
162039 or via sarahbaird@north-ayrshire.gov.uk. 
Background Papers 
National Islands Plan, 2019 
490

Page 491

National Islands Plan Review: Consultation 
Respondent Information Form 
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/ 
Are you responding as an individual or an organisation?   
Individual 
Organisation
Full name or organisation’s name 
Phone number 
Address 
Postcode 
Email Address 
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing 
preference: 
Publish response with name 
Publish response only (without name) 
Do not publish response
We will share your response internally with other Scottish Government policy teams who may
be addressing the issues you discuss. They may wish to contact you again in the future, but
we require your permission to do so. Are you content for Scottish Government to contact you
again in relation to this consultation exercise? 
Yes 
No 
North Ayrshire Council
Economic Development and Regeneration, Cunninghame House, Irvine.
07919 162039
KA12 8EE
sarahbaird@north-ayrshire.gov.uk
Information for organisations:
The option 'Publish response only (without
name)’ is available for individual
respondents only. If this option is selected,
the organisation name will still be
published. 
If you choose the option 'Do not publish
response', your organisation name may still
be listed as having responded to the
consultation in, for example, the analysis
report. 
491

Page 492

Introductory Comments 
North Ayrshire Council (NAC) welcomes the opportunity to respond to the Scottish
Government consultation on the National Islands Plan (NIP). NAC is the first Scottish
island authority to work in partnership with the Scottish Government and Highlands &
Islands Enterprise to deliver an Islands Recovery & Renewal Pilot. The pilot builds on
NIP actions and interprets and delivers these at locality level through the development
and delivery of Ten-Year Island Action Plans and is coordinated by the Senior Officer-
Islands. The Senior Officer- Islands works across Council services to ensure a joined-up
delivery to Island Plan actions. 
The response has been informed by the experience of and feedback obtained through
the pilot project. This includes feedback through the Locality Partnership and Islands
Plan Steering Group. We are not able to fully answer all the questions in the consultation
due to a number being targeted towards feedback from island citizens. We have
therefore answered relevant questions and highlighted where questions are better suited
to resident responses. 
We have engaged with the Island Plan Steering Groups on both islands to assist them to
prepare and submit their own separate responses. This has included attending Scottish
Government consultation workshops on Cumbrae and on Arran, supporting the groups
to engage with members and more widely across the island communities, and assisting
with preparing responses. 
A key area of focus of the pilot has been strengthening the partnership with our island
communities of Arran and Cumbrae, island businesses, and wider stakeholders to
support the development of applications to local and national funding schemes including
the Scottish Government Islands Programme and to facilitate and commence delivery of
10-year Local Island Plans to maximise the potential of North Ayrshire’s islands, improve
outcomes and benefits for our islanders. As these plans are implemented, they are
contributing to and delivering on improved outcomes for the community, economic, and
environmental wellbeing of Arran and Cumbrae. 
Through ongoing engagement with our island communities on Arran and Cumbrae, the
following key priorities, while not exhaustive, were identified as recurring themes. These
were expressed in 2021 through the development of the Local Islands Plans and remain
today. They are listed in no order of importance or priority: 
• Economic growth, investment, and sustainability
• Reliance on seasonal tourism and the need for diversification
• Community capacity and empowerment
• Transport 
• Recruitment and retention of employees
• Housing
• Health and social care
• Energy and energy costs
• Connectivity/digital
• Planning policy
• Preservation of heritage and cultural identity
• Protection of natural environment
• Education and skills and retention of young people 
• Meeting the needs of older people
492

Page 493

• Population and depopulation
• “Island premium” costs
• Marine planning
• Resilience 
These priorities should therefore be considered within the review of the NIP. 
493

Page 494

The Consultation   
Question 1 
How much would you say you know about the current National Islands Plan? 
Nothing at all
I have heard of it but know nothing about the content
I know a little about it
I know a lot about it 
The Council knows a lot about it. 
Question 2  
Has the current National Islands Plan affected your life in any way?   
Yes  
No 
Don’t know 
Please feel free to expand on your answer in the box below.   
It is noted that this question is primarily targeted towards island citizens. From a
Local Authority perspective we would however provide the following feedback. 
Through the introduction of the NIP in 2018, the Council identified an opportunity
to test new ways of working across island communities and businesses, local and
national government, community planning partners and Highlands and Islands
Enterprise. 
In 2021, the Council commenced a three-year Islands Recovery and Renewal Pilot
in partnership with the Scottish Government and Highlands and Islands Enterprise.
This aims to support an inclusive and green economic recovery and renewal of
North Ayrshire’s island communities in line with their unique challenges and
opportunities, led by a Senior Officer- Islands post. The pilot is strongly aligned to
the delivery of the strategic objectives of the current NIP and to Community Wealth
Building (CWB) principles, contributing to the Council’s CWB Strategy and
reflecting our pioneering approach to economic development in Scotland. 
The focus of the pilot to date has been on the creation of the Island Plans for each
of the North Ayrshire islands. The plans were developed in 2021/22 and both
reflect synergies with the Strategic Objectives of the NIP whilst creating a locality
focus for Arran and Cumbrae. The success of the pilot has led to a two-year
extension from the Scottish Government and Highlands & Islands Enterprise
commencing March 2024. This will allow NAC to match this continued support and
to create a longer-term Islands Recovery and Renewal Programme, reflective of
the need for a longer timescale to implement actions from the plans. 
During the development of the Local Island Plans, the Council commissioned and
494

Page 495

published research from the Fraser of Allander Institute on the ‘The impact of
Covid-19 on the Arran economy’ and the Council undertook an economic profiling
exercise for the Cumbrae economy. Both reports provided an outline socio-
economic baseline for Arran and Cumbrae to be updated and monitored to inform
an evidence-based approach to policy development and funding bids. 
It is recognised however, that there are challenges around obtaining accurate
data, specifically relating to Cumbrae. This is due to the relatively small size of the
community, which has not been separated from the mainland in statistics and the
relatively complex makeup of its population. Both Arran and Cumbrae island
stakeholders have expressed the importance of continuing to build on good quality
data for each island, ensuring an accurate evidence base for future decision-
making and the prioritisation of resources including financial investment. 
One possible solution to addressing this concern being explored through the
Ayrshire and Highlands and Islands Regional Economic Partnerships is the
potential of creating Regional Intelligence Hubs. This approach would support
regional and local data analysis, relevant policy research and support strategy
development, covering a broad range of economic issues facing our region
including demographics, economic growth, skills, housing, and employment. 
Question 3 
Has the effect of the current National Islands Plan on your life been positive, negative
or not at all?     
Positive
Negative  
It has not affected my life 
Please feel free to expand on your answer in the box below.   
It is noted that this question is primarily targeted towards island citizens. From a
Local Authority perspective we would provide the following feedback.
We consider the current National Islands Plan to have contributed positively for our
island communities. It has provided direct effects and benefits specifically through
the support and delivery of the Islands pilot and the dedicated resource and
funding provided, to achieve a range of specific outcomes aligned to the islands’
priorities. Examples include:
• The development, ongoing support and monitoring of Local Islands Plans for
both Arran and Cumbrae.
• Formation of new Island Plan Steering Groups creating collaborative, inclusive
and place-based partnerships taking a progressive role in local development
and action planning for their islands.
• Specific support provided for island communities to address their priorities and
support the identification and preparation of bids to access external funding for
example through the Scottish Government Islands Programme, funding for
North Ayrshire Islands Skills Initiative pilot and Islands Cost of Living
Emergency Crisis funding.
• The pilot is contributing to closer and more coordinated working between the
495

Page 496

island communities, community planning partners, national and local
government and our collective approach to improve island wellbeing, including
in areas such as housing where the Arran Housing Task Force has also
recently been established. 
Question 4 
What are your views on the content of the current National Islands Plan?   
Positive
Negative  
None 
Please feel free to expand on your answer in the box below. 
The current NIP has informed the development of our Islands Recovery and
Renewal Pilot and Local Islands Plans. The strategic objectives covered all the key
priorities for island communities informed by the consultation exercise across more
than 40 islands including on Cumbrae and Arran and involving over 1,000
participants. However it is recognised that the current National Islands Plan was
published in December 2019, just months before the pandemic and as a result the
focus for delivery has had to be flexed to support island communities through this
exceptional period. 
The content of the current plan is effectively presented, clear, concise. The Plan is
recognised as being a high-level strategic plan, however it would benefit from
improved simplified language and reduction of public sector terminology. In
addition, the current plan is lengthy and would benefit from an accompanying
abridged version going forward in the new version that would be more accessible
to island communities. 
Question 5   
In your opinion, has the current National Islands Plan made progress towards
achieving its Strategic Objectives to address: 
No progress  Minimal Satisfactory  Progress 
progress progress exceeding 
expectations 
Strategic Objective 1  
Population   □  □  □  □ 
Strategic Objective 2 
Sustainable Economic □  □  □  □
Development 
Strategic Objective 3 
496

Page 497

Transport   □  □  □  □ 
Strategic Objective 4
Housing   □  □  □  □  
Strategic Objective 5
Fuel Poverty   □  □  □  □   
Strategic Objective 6
Digital    □  □  □  □  
Strategic Objective 7
Health, Social Care   □  □  □  □
and Wellbeing   
Strategic Objective 8 
Environment and   □  □  □  □
Biodiversity  
Strategic Objective 9
Climate Change and  □  □  □  □
Energy   
Strategic Objective 10
Empowered   □  □  □  □
Communities   
Strategic Objective 11
Arts, Culture    □  □  □  □
and Language 
Strategic Objective 12
Education   □  □  □  □ 
Strategic Objective 13 
Implementation   □  □  □  □ 
497

Page 498

We welcome the progress of the National Islands Plan to date however we
recognise that further significant action and investment is required to fully deliver
on the strategic objectives.  This is particularly the case in relation to population,
transport, connectivity and housing, which are the key priorities for our island
communities.  We would also highlight that the island communities are best placed
to respond to this question from an islander’s perspective. 
From a Local Authority perspective there are several key examples of positive
progress being made locally toward the national strategic objectives including:
SO1 Population: through our involvement with the Convention of Highlands and
Islands Population Working Group, the Council secured funding to develop and
deliver the North Ayrshire Islands Skills Initiative pilot to address population
decline and ensure a healthy and balance population profile. 
SO2 Sustainable Economic Development: through the facilitation and delivery of
the Local Island Plans to maximise the islands’ sustainable economic potential.
SO4 Housing: through the recent establishment of a new Arran Housing Task
Force by the Council, involving a wide range of partners to address the housing
issues facing island residents and businesses.  
SO5 Fuel Poverty: through the Scottish Government Cost of Living Crisis
Emergency Fund, we are providing Energy Smart funding for tailored advice,
support and grants and Money Matters support to provide specific money and debt
advice to help island households manage higher energy costs and to address the
urgency of the cost crisis.
SO10 Empowered Island Communities and Strong Local Partnerships:
through the creation of Island Plan Steering Groups taking a progressive role in
local development and action planning for their islands, to empower diverse
communities and different places and through Island Programme funding to
support the delivery of community led projects.
SO11 Arts, Culture and Heritage: through securing funding to appoint a
dedicated Island Culture & Heritage Officer to support arts, culture and language
on Arran and Cumbrae.
The Council welcomes the Annual Report presented to the Parliament each year
setting out the progress made and the publication of an annual implementation
route map (IRM) that addresses each of the 13 strategic objectives (SO) and
accompanying commitments.  However, the IRM could benefit from detailed SO
case studies including pictures and lead organisation information that brings the
commitments and actions to life, island communities can identify with and that can
be used as tangible examples of best practice, show casing the activities taking
place across Scottish Islands. 
498

Page 499

Question 6   
There are 13 Strategic Objectives in the current National Islands Plan. What is your
opinion on the number of strategic objectives? 
Just right
Too Many 
Too Few 
No opinion 
Please feel free to expand on your answer in the box below.     
The number of strategic objectives should be proportionate to and reflect the
needs of island communities and the Plan’s commitments.  This should be
informed by the feedback from the consultation process and be deliverable within
the context of the Plan and associated resources. It should however be noted that
the strategic objectives are interrelated with several of the 13 identified being
dependent on the delivery of the Transport, Housing and Population objectives. A
smaller number of objectives could therefore be considered on this basis. 
Question 7 
There are 134 commitments in the current National Islands Plan What is your opinion
on the number of commitments? 
Just right
Too Many 
Too Few 
No opinion 
Please feel free to expand on your answer in the box below.   
The number of commitments should be proportionate to and reflect the objectives
of the Plan.  This should be informed by the feedback from the consultation
process and be deliverable within the context of the Plan and associated
resources. 
Question 8 
Overall, what do you has think worked well in the current National Islands Plan? 
It is noted that this question is primarily targeted towards island citizens, the
Council is supporting the preparation of separate consultation responses from
each of the Island Plan Steering Groups for Arran and Cumbrae that will be
submitted by the Chair of each group, with support from the Senior Officer,
Islands, allowing for a full response to all consultation questions from North
Ayrshire islands.  These separate responses will ensure that the feedback comes
499

Page 500

directly from island residents on what they think worked well in the current National
Islands Plan. 
We would however offer the following feedback from a Local Authority perspective. 
The provision of funding through the various funding streams has been welcome
including the Islands Infrastructure Fund, Islands Programme, and Islands
Communities Fund. Through this funding, our islands have benefited from a range
of investment to date.  Through time it is envisaged that these projects will support
the islands to continue to be attractive, compelling, and economically viable places
to remain or relocate through investment that improves, creates, or safeguards
locally developed and delivered projects, that ultimately contribute to measurable
population retention and repopulation. 
The projects that are being delivered via the Islands Programme will have a long-
term impact in the communities and are critical to community growth and
development. As well as delivering capital infrastructure, the services provided via
these projects will enable a range of well-being, environmental and quality of life
benefits to the communities. We would envisage that their delivery will lead to
benefits such as job creation, increased tourism, improved infrastructure,
increased accessibility and enhanced local service provision. 
The support provided for the Islands Recovery and Renewal pilot from Scottish
Government (SG), Highlands and Islands Enterprise (HIE) and North Ayrshire
Council, as a result of the current National Islands Plan, has been fundamental to
enabling the development of Local Island Plans.  Arguably this would either not
have happened or not at the scale, scope or pace it has, without this direct
support. 
To demonstrate an example of what has worked well, the 3-year Islands Recovery
and Renewal pilot (2021-2024) has been extended by a further 2 years to the end
February 2026, demonstrating the Council, HIE and SG’s recognition of the
importance of this resource in supporting our islands. There is a continuous focus
through the dedicated Islands pilot on identifying economic opportunities on Arran
and Cumbrae including progressing improved alignment in investment, taking
opportunities as they arise, tackling obstacles and identifying and delivering on the
islands shared priorities. 
Question 9 
Overall, what do you think could have worked better in the current National Islands
Plan? 
It is noted that this question is primarily targeted towards island citizens. The
Council are supporting the preparation of separate consultation responses from
each of the Island Plan Steering Groups for Arran and Cumbrae that will be
submitted by the Chair of each group, with support from the Senior Officer,
Islands, allowing for a full response to all consultation questions from North
Ayrshire islands representation.  These separate responses will ensure that the
feedback comes directly from island residents on what they consider could have
worked better in the current National Islands Plan. 
500

Page 501

We would however offer the following feedback from a Local Authority perspective.
Whilst the funding made available through the Plan has been welcomed additional
capital and revenue funding would have further supported the delivery of the plan’s
priorities. There is also a need to simplify the external funding landscape
specifically related to funds linked to the National Islands Plan targeted to island
communities and ensuring investment available is proportionate and reflective of
the ’premium’ costs of living and costs of doing business on islands. This is critical
to reducing inequalities, supporting recovery, building resilience, and ensuring
sustainable and set-for-success project delivery. 
For future funding rounds, the Council would welcome early engagement in the
Scottish Government’s considerations for distribution options to ensure there is a
fair and consistent methodology for the allocation of funds to island communities in
Scotland. 
For our islands to be in a strong position to fully exploit investment opportunities
that the National and Local Island Plans address, there must be a coordination of
the Islands Programme to other capital funding and planned initiatives for islands,
both at local authority and national level. Our islands need to prepare not react.
Funding streams must complement and enhance ongoing planned investment
designed to support those living on Scotland’s islands and ensure that island
communities and stakeholders are central to the decisions on how and where
these capital investments are made. 
It is important to note that there is also a need for island specific revenue funding
for example towards capacity building and project specific delivery staff. This is
essential to improve and assist infrastructure/capital projects delivery specifically
where statutory and public bodies are not eligible to apply for Island Programme
streams for example the Islands Community Fund. 
Infrastructure projects by their nature require a significant level of lead in time and
development to ensure that the communities and stakeholders are engaged in the
process and inform their development. The relatively tight timescales around
funding and delivery have constrained the ability to secure match funding to
provide additionality and support delivery. Early notice of timelines for future
rounds of the fund would further improve the process and enable authorities to
work with island communities to develop project pipelines and plan resource
around submission dates. 
Question 10 
Do you think there should be a new plan for the Scottish Islands?     
Yes / No / Don’t know 
Please explain your reasons     
We would propose that a refresh of the current Plan be undertaken which
501

Page 502

effectively address input obtained from the consultation process.  This should
include the feedback received from island communities and Authorities specifically
around governance, awareness, and the focus of a National Islands Plan. 
Question 11 
What would you like to see in any future or revised National Islands Plan? 
Refresh the current National Islands Plan but keep the same format
A whole new plan is needed
Something else 
Please feel free to expand on your answer in the box below. 
This consultation provides an important opportunity to ensure that the plan’s
objectives still meet the needs of our island communities and reflect the priorities
that island communities want Scottish Government and delivery partners to focus
on. The plan should promote, support, and harness the voices, resources, and
wellbeing of island communities. 
The plan should recognise the interconnectivity between the strategic objectives,
noting that they are not linear, and all have a dependency and impact on each
other for example transport, housing, employment. Consideration of a more
thematic or cluster approach to strategic objectives would be encouraged with a
Community Wealth Building approach embedded within any future iteration, to
ensure maximum local benefit for island communities. 
This is a time when Scotland, its communities and residents are all facing severe
economic conditions, inflationary burdens, and pressures on resources therefore,
a refresh rather than the creation of a whole new plan may be more appropriate
and resource and cost effective. 
The development and delivery of a future iteration of the NIP needs to be suitably
resourced nationally and locally to enable effective delivery of all relevant priorities
appropriate to the islands. It must be supported by long term and multi-year
funding that enables and creates local opportunity, generates community wealth
building, builds momentum, supports change, and delivers economies of scale,
value for money and social return on investment for communities and their local
economies. 
The NIP would benefit from an improved and effective communication strategy and
using a variety of communication methods. This could include utilising traditional
communication methods including local newsletters, local papers, leaflets, posters
etc recognising that not all island community residents wish to or are able to
access digital communications. It would be beneficial to have more island
community input to NIP Communications Plan for the future. 
Consideration should be given to how islands Councils are and can be supported
to use existing powers available to them and collaborate with communities to
deliver improved, more responsive public services and better outcomes for
communities through the NIP. As the Local Authority, we can and do open doors to
502

Page 503

communities. An improved partnership approach by Scottish Government across
all island authorities to work very efficiently through them will ensure SG
meaningfully engage with the people and communities who will be impacted by
introduction of a new NIP, relevant policy changes or additions. 
Contribution to Impact Assessments 
We will be seeking the views of stakeholders and the public for the Island Communities
Impact Assessment for this work and on any potential equality issues. We are assessing what
impact our islands policies may have across protected characteristics as defined in the
Equality Act 2010 (age, disability, gender reassignment, marriage and civil partnership,
pregnancy and maternity, race, religion or belief, sex, sexual orientation). Impact
assessments will be further developed alongside the drafting of the refreshed National Islands
Plan. 
If you would like to be engaged in the impact assessment process, please email the Scottish
Government’s Islands Team at info@islandsteam.scot.   
503