NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet
Title:  Roads Winter Service and Weather Emergencies Plan
2023/24 
Purpose: To seek approval from Cabinet for the Roads Winter Service
and Weather Emergencies Plan 2023/24. 
Recommendation: That Cabinet (a) approves the Roads Winter Service and
Weather Emergencies Plan 2023/24 and (b) notes the
preparations and actions taken which are contained in the
Winter Preparation Action Plan. 
1. Executive Summary 
1.1 North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over public roads which
by definition includes carriageways, footways, footpaths, pedestrian precincts, etc. 
1.2 The Council is also responsible for the management and operation of the coastal flood
protection controls at Largs and Saltcoats. The Council will close the flood gates on the
promenades and erect the flood barriers at Largs Pier in advance of predicted severe
weather with minimum disruption to promenade users and the Largs to Cumbrae ferry.
Coastal flooding can occur at any time and, accordingly, the Council provides this
service throughout the year. 
1.3 A review of the Council's Winter & Weather Emergencies Service was undertaken over
the summer months. The 2023/24 Winter Preparation Action Plan has been developed
to ensure adequate preparations and effective arrangements are in place for 2023/24.
The Winter Preparation Action Plan is included at Appendix 1. 
1.4  The Roads Winter Service and Weather Emergencies Plan 2023/24 is contained at
Appendix 2. 
2. Background 
2.1 In its statutory role as the local Roads Authority, the aim of North Ayrshire Council in
respect of its winter service and weather emergencies is to: 
•  provide a standard of service on public roads which will permit safe movement of
vehicular and pedestrian traffic appropriate to the prevailing weather conditions.
•  establish a pattern of working which will keep delays, diversions, or road closures
to a minimum during adverse weather conditions.
•  conduct operations having regard to the requirements of the Health & Safety at
Work Act 1974 and any other relevant enactments.

Page 2

2.2  Separately, the Trunk Road Network is the responsibility of Transport Scotland and
their management contractor, Amey. The Trunk Road network includes the A78, the
A737 from Kilwinning to the Renfrewshire Boundary and A738 from the Pennyburn
Roundabout to the A737 Dalry Road, Kilwinning. 
2.3  All winter gritting and snow clearing operations on the Trunk Road Network are the
responsibility of Amey. The Council’s Roads Team do however liaise on a regular basis
with the trunk road operator during periods of adverse weather in order to provide the
best possible seamless service to the travelling public. 
2.4  The Council’s current updated Winter Preparation Action Plan 2023/24 highlights a
number of key areas where preparation arrangements are being reviewed and
refreshed: 
•  Salt supply resilience, storage and capacity
• Resilience arrangements
•  Grit bins/community resilience 
2.5 Whilst the Council's primary focus is on our Priority Network, our communities have an
expectation of wider assistance during extreme weather, for example in and around
schools, in residential streets, car parking areas etc. There are approximately 500 grit
bins provided on the road network. Salt is also available from a number of supply points
throughout the Council area. Details of planned winter treatments are posted on the
Council’s website. In addition, details of disruption to the road network caused by
adverse weather are also posted on the website. In periods of severe weather Elected
Members are also provided with regular service updates. 
2.6 Road hazard weather forecasting is provided through a collaborative contract led by
South Lanarkshire Council. A new Weather Forecast provider, MetDesk Limited, has
been appointed as the weather forecast provider. During the winter period MetDesk
Limited will provide the weather forecasting service and monitor road and weather
conditions. 
2.7 The Council’s gritting routes have been developed from thermal mapping of the road
network. Thermal mapping is a process by which the variation of minimum night-time
road surface temperature is measured, and this provides the temperature relationship
across the whole network, identifying those sections of the road which are likely to
freeze first. Thermal Mapping identifies colder roads and enables selective targeting of
those areas in need of treatment. Our gritting routes are unchanged for this winter,
details of each Priority route are provided on the Council’s web pages at:
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx   
2.8  A total of 65% of the road network will receive planned treatments. The remaining 35%
of the road network, comprising of minor rural and residential roads, is covered by
Priority 3 routes. All routes will continue to be monitored and reviewed over the winter
period and amended where necessary. 
2.9  Priority 1 routes will be treated on receipt of an adverse weather forecast as detailed in
the decision-making matrix contained in Appendix C of the Winter Service and Weather
Emergencies Plan 2023/24. 
2.10  Priority 2 routes will be treated in addition to Priority 1 routes when sub-zero
temperatures are forecast to extend beyond midday and will be treated following
completion of Priority 1 routes. Generally, the treatment of Priority 2 routes will
commence at 8.00am however appropriate treatment may be instructed at any time

Page 3

depending on conditions. 
2.11  Priority 3 routes will generally only be treated following severe weather or when sub-
zero conditions are forecast to continue over an extended period. They will be treated
as resources permit only after all Priority 1 and Priority 2 routes are clear unless
identified as an emergency. 
2.12 Operational resources from Neighbourhood Services (Roads) and Streetscene will be
provided for the Winter and Weather Emergencies Service. The stand-by period for
carriageway treatments will be 19 October 2023 until 11 April 2024. This period may be
extended beyond the given dates if required. These arrangements include home stand-
by which is activated by the designated Winter Supervisor when instructed by the
Winter Controller or as the result of hazardous road conditions being reported.
Arrangements have also been made with Streetscene to assist with the treatment of
priority footways over the winter season and stand-by arrangements are also in place
with Streetscene to treat footways, when necessary, at weekends from 18 November
2023 through to 4 February 2024 and over the festive holiday period. Generally, the
treatment of footways will commence at 8.00am. 
2.13  Last winter season, which was generally a mild winter the Service used 5097 tonnes of
salt, this was similar to the previous year when we used 5,014 tonnes of salt treating
the road network, however in winter 2020/21, which was a colder winter, the Service
used 8,153 tonnes of salt during the winter. A total of approximately 6,500 tonnes of
salt will be stored at our Goldcraigs Depot and 2400 tonnes at our Market Road Depot,
complying with the salt stock levels agreed with the West of Scotland Regional
Resilience Partnership (WoSRRP). In addition, salt will be distributed to Streetscene
Depots to assist with the treatment of footways. Salt usage will be monitored weekly
and stocks will be augmented if necessary. 
2.14  The role of communities to provide their own resilience is recognised and grit bins will
be replenished to allow communities to self-help during periods of adverse weather
within available resources over the winter period. 
2.15  Similar to last winter, winter treatment decisions and any road closures due to adverse
weather will be provided on the Council’s website. 
2.16  A pre-winter planning meeting was held on 3 October 2023 with Managers from across
Council Services. This meeting was held to ensure Services are taking the necessary
steps to prepare for the severities of winter weather. 
2.17  A planning exercise known as the ‘dry run’ was carried out on 29 September 2023 to
check our readiness for the forthcoming winter season. 
2.18  The weather stations on the A760 at Catburn, between Largs and Kilbirnie, and on the
B880 String Road, Arran have been serviced and calibrated and will assist Winter
Controllers and Supervisors in monitoring weather conditions. Cameras are fitted on
the weather stations and images from the these are available to members of the public
through the Council’s website. 
2.19 Each year, a Winter Preparation Action Plan is created to ensure adequate and
appropriate arrangements are being put in place for the forthcoming winter. The
2023/24 Action Plan detailed at Appendix 1 confirms all planned actions are either
complete or are on target. 
2.20 In critical situations should our operational resources be impacted, a reduced priority
network has been developed to ensure that essential transport links can continue to be

Page 4

treated during adverse weather conditions.  This minimum resilience network will assist
in maintaining network access for vital services in extreme circumstances. 
3. Proposals 
3.1  Cabinet is asked to approve the Roads Winter Service and Weather Emergencies Plan
2023/24 and note the preparations undertaken as detailed in the attached 2023/24
Winter Preparation Action Plan.  
4. Implications/Socio-economic Duty
Financial
4.1 A budget of £0.552m has been allocated for the delivery of the Roads Winter Service
and Weather Emergencies Plan 2023/24. 
Human Resources 
4.2 The Winter Service and Weather Emergencies Plan will be delivered within existing
resources. 
Legal 
4.3 The Council has a statutory obligation under Section 34 of the Roads (Scotland) Act
1984 "to take such steps as they consider reasonable to prevent snow and ice
endangering the safe passage of pedestrians and vehicles over public roads". 
Equality/Socio-economic 
4.4 The delivery of the Winter Service maintains accessibility to our towns and
communities and supports social and economic activity. 
Climate Change and Carbon 
4.5 This report provides details of operational arrangements in place for responding to
Climate and related weather emergency incidents. There are no carbon issues arising
directly as a result of this report. 
Key Priorities 
4.6 Delivery of the winter service supports the Council Plan priority of keeping North
Ayrshire residents safe. 
Community Wealth Building 
4.7 Delivery of the Winter and Weather Emergencies Service supports Community
Wealth Building by maintaining a resilient road network enabling access to
employment and movement of goods and services. 
5 Consultation 
5.1 Consultation regarding preparations for the forthcoming winter season and the
development of the Winter Action Plan was undertaken with The Ayrshire Civil
Contingencies Team, Transport, Streetscene, Waste Services, Communications,

Page 5

Customer Services, North Ayrshire Health and Social Care Partnership, Education,
Housing, Criminal Justice, suppliers, and external organisations. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Neighbourhood Services
on 01294 324570. 
Background Papers
Appendix 1 – Winter Preparation Action Plan 2023-24
Appendix 2 – Winter Service 2023-24

Page 6

1
Appendix 1 
NNEEIIGGHHBBOOUURRHHOOOODD  SSEERRVVIICCEESS  --  22002233//2244  WWIINNTTEERR  PPRREEPPAARRAATTIIOONN  AACCTTIIOONN  PPLLAANN   
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
1.0 Policies, Procedures
& Guidance    
1.1 Review Existing Policy
and Procedures
document
Winter and Weather Emergencies
Procedures and Resources Document
reviewed on annual basis. 
Review annually after each
Winter Period.
September
2023
Complete      
2.0 Review of Existing
Winter Maintenance
Operations    
2.1 Existing Priority Gritting
Routes
Priority 1 routes cover 44% of the
network, Priority 2 routes cover 21%
of the network.   
No changes proposed, review
annually.
September
2023  Complete
2.2  Non-Priority Routes Priority 3 routes are treated following
an extended cold spell or following
severe weather. 
No changes.  September
2023 
Complete 
2.3 Footway Gritting Formal arrangement with Streetscene
for assisting with reactive delivery of
the winter service. 
Review annually.  September
2023
Complete
2.4  Assistance from outside
parties
Formal arrangement in place with
local contractors and farmers to assist
in the event of extreme weather
conditions. 
Review annually.  Arrangements
made for a contractor to provide
Gritting on Cumbrae for this
winter.
September
2023
Complete
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
2.5 Gritting of other Council
locations
Education and Housing have
arrangements in place with
Streetscene and Community Justice
for assistance with snow clearing and
gritting. 
Review arrangements annually.  September
2023 
Complete

Page 7

2
2.6 Network Resilience Resilience network developed should
drivers be depleted in extreme
situations (eg. The Pandemic)  
Mutual aid arrangements established
with neighbouring authorities Trunk
Road Operator. 
Review annually  September
2023
Complete      
3.0 Winter Gritting Fleet    
3.1 Winter Gritting Fleet The gritting fleet comprise 13 No. 18
tonne Econ Uni-Bodies and 1 No 7.5
Tonne Econ Uni-Bodies and 1 Trailer
Gritter. 
7 no. new 18 tonne Econ Uni-
Bodies and 1 new 7.5 tonne Multi-
spread to be provided for this
winter season. Vehicles to be
serviced and gritter units to be
calibrated. 
October
2023
Complete      
4.0 Operational Controls    
4.1 Weather forecast
provision
The Council’s weather forecast
service is currently procured by
means of a collaborative contract with
12 other Local Authorities in the South
West of Scotland. 
A new contract is in place for this
winter with MetDesk Limited,
Contract was awarded for 4 years
+ 2 year extension option,
commencing May 2023. 
September
2023
Complete
4.2 Ice Prediction methods North Ayrshire Council has two
weather stations installed on the road
network and has access to a further
two weather stations in the Council
area, provided by Transport Scotland,
on the trunk road network. We also
have access to a number of additional
weather stations on our neighbouring
authorities’ road network. 
Stations to be serviced and
calibrated for start of winter
season. 
September
2023  Complete

Page 8

3
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
4.3 Winter Gritting Records Records of winter instructions and
operations recorded on Vaisala
Manager - Winter Roads Management
System. Record footway treatments
undertaken.
Continue to record roads winter
actions on Vaisala Manager -
Winter Roads Management
System. 
September
2023  Complete
4.4 Business Continuity The provision of Winter and Weather
Emergencies Procedures and
Resources document is included
within the Business Continuity Plan. 
Review Business Continuity Plan. Review
Annually  Complete     
5.0 Salt    
5.1 Salt Storage Ensure salt stock complies with
Scottish Government resilience levels
prior to the onset of the winter season. 
7000 Tonnes of salt to be stored
at Goldcraigs Depot and 2400
tonnes to be stored on Arran for
start of winter season. 
Review
Annually  Complete
5.2 Salt Distribution Procedure implemented for salt
distribution throughout Council
Services in place at Depot.
Review and ensure all staff are
aware of procedures annually.
Review
Annually  Complete      
6.0 Communication    
6.1 Information available to
Members, Council
Services, general public
and other stakeholders
Weather forecasts and winter
decisions distributed across Services. 
Roads winter gritting decision posted
on Council Website. 
Details of any road closures due to
adverse weather posted on Website. 
Issue information to Locality
Planning Partnerships. 
Continue to provide information
on the Council website. 
Monitor effectiveness of
information provided on the
Council website. 
Promote Roads Winter Service
during Customer Services Week
and Are You Ready for Winter
campaign.
Oct/Nov
2023 
Review
Annually 
Review
Annually 
Oct/Nov
2023
On target 
Complete 
On target 
On target

Page 9

4     
7.0 Measuring
Performance    
7.1 Monitor performance of
winter actions
Performance is currently measured
using APSE Performance indicators
which measure efficiency in relation to
documented procedures. 
Review annually. October
2023
On target
7.2 Monitor performance on
individual routes
Gritting routes optimised following
thermal mapping exercise undertaken
during winter season 2018/19.
No changes proposed, review
annually.
September
2023
Complete
7.3 Improve efficiency of
gritting operations
Winter decisions are made based on
thermal mapping exercise carried out
during winter 2018/19. 
No changes proposed, review
annually.
September
2023
Complete      
8.0 Training    
8.1 Winter Service Training Staff trained in delivery of winter
service. 
Identify training needs of
personnel involved with the
provision of the winter
maintenance service.  Arrange
appropriate training. 
Review
Annually 
Complete 
8.2 Severe Weather
Exercise
Ayrshire Local Resilience Partnership
arrange Severe Weather tabletop
exercises periodically.
Appropriate attendance at ALRP
exercises as arranged.
As arranged. Complete      
9.0 Health & Safety    
9.1 Toolbox Talks Toolbox talks are delivered to all
personnel engaged in the delivery of
the winter maintenance service.
Review annually and provide
toolbox talk at the start of each
winter.
Annually Complete

Page 10

APPENDIX 2 
Neighbourhood Services 
Roads Winter Service
and
Weather Emergencies Plan 
2023 – 2024 
Cunninghame House
IRVINE
Ayrshire KA12 8EE
Tel:      01294-310000

Page 11

1 | P a g e
CONTENTS  
Page No 
1. Introduction 2       
2. Priorities for Winter Treatment 3
3. Organisation 5
4. North Ayrshire Council Resources (Roads) 6      
5. Other Resources 7
6. Weather Forecasting 8
7. Decision Making 8
8. Ice Prediction 9
9. Road Condition Reports 9
10. Communications 9
11. Road Closures 10
12. Liaison with the Police 10
13 ALRP Disruptive Weather Response Arrangements 11
14. Cross Boundary Arrangements 11
15. Vehicle Routes 11
16. Precautionary Salting 12
17. Grit Bins 12
18. Largs and Saltcoats Flood Protection Schemes 12
19. Sandbag Procedures 12 
Appendix A - Priority1 Carriageway Gritting Routes
Appendix B - Level of Service
Appendix C - Decision Making        
Appendix D  - Summary of Available Labour & Plant       
Appendix E - Community Grit Bins        
Appendix F - Summary of Available Materials
Appendix G - Salt Resilience
Appendix H  - Contacts Arrangements 
Appendix I - Distribution List
Appendix J - Bridges with weight or height restrictions
Appendix K  - Arrangements with other Authorities
Appendix L - Grit Bin Policy and Procedure 
Appendix M  - Resilience Network

Page 12

2 | P a g e
1. INTRODUCTION 
North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow
and ice endangering the safe passage of pedestrians and vehicles over public
roads which by definition includes carriageways, footways, footpaths, pedestrian
precincts, etc. 
In its statutory role as the local Roads Authority, the aim of North Ayrshire Council
in respect of its winter service and weather emergencies is to:- 
(i) provide a standard of service on public roads which will permit safe
movement of vehicular and pedestrian traffic appropriate to the prevailing
weather conditions. 
(ii) establish a pattern of working which will keep delays, diversions, or road
closures to a minimum during adverse weather conditions. 
(iii) conduct operations having regard to the requirements of the Health & Safety
at Work Act 1974 and any other relevant enactments. 
This Plan only relates to the Council’s duties as Roads Authority and does not cover
the wider response of the Council during winter and other weather emergencies. 
North Ayrshire Council has no responsibility for the treatment of trunk roads. From
1st April 2001, the contract for management and maintenance of the trunk roads in
Scotland has been awarded by the Scottish Government to the private sector. The
successful contractor for the South West of Scotland is Amey and the roads
involved in North Ayrshire are as follows:- 
A78 full length from Meadowhead roundabout, Dundonald to Inverclyde boundary
at Skelmorlie. 
A737 Dalry Road, Kilwinning to Renfrewshire boundary. 
A738 Pennyburn roundabout to A737 Dalry Road, Kilwinning 
All winter gritting and snow clearing operations on these roads will be the
responsibility of Amey. North Ayrshire Council’s Neighbourhood Services (Roads)
and Amey liaise on a regular basis during periods of adverse weather in order to
provide the best possible service to the travelling public. 
North Ayrshire Council is also responsible for the management and operation of the
coastal flood protection controls at Largs and Saltcoats. The Council will close the
flood gates on the promenade and erect the flood barriers at Largs Pier in advance
of predicted severe weather with minimum disruption to promenade users and the
Largs to Cumbrae ferry. Coastal flooding can occur at any time and, accordingly,
the Council will provide this service throughout the year. 
In the event of extreme weather similar to that which was experienced on Arran late
March 2013 where major disruption affects large parts of the community, a

Page 13

3 | P a g e
coordinated response is adopted by the Council to ensure public safety.  In dealing
with such emergencies, the Police initially lead the emergency or response stage of
the emergency. Thereafter, the Council leads the recovery stage. Generally, there
are 3 levels of Civil Contingencies response. There is a strategic group at National
or Strathclyde wide level, a tactical group at North Ayrshire level and an operational
group at local level. 
The Ayrshire Civil Contingencies Team (ACCT) act as lead for the Council and
implement the Civil Contingencies Plan liaising with all relevant Stakeholders
identified within the Plan. 
2. PRIORITIES FOR WINTER TREATMENT 
North Ayrshire Council has defined the priorities for carriageway and 
footway/footpath treatment as follows: 
2.1.1 Carriageway Priorities 
Where slush is formed, this shall be removed as soon as practicable to avoid the
risk of rutting should there be a further significant fall in road temperatures which
might result in freezing conditions. 
2.1.2 Carriageway Routes for Proactive Treatment 
Priority 1 – Strategic, Main Distributor and Distributor routes, bus routes and
certain pre-determined Secondary Distributor routes identified from the Local
Transport Strategy (LTS) will be treated when it is forecast that snow or ice is likely
to be present on road surfaces. 
Due to the various climatic domains within North Ayrshire the Priority 1 routes may
be adjusted to cover either the four pre-determined Inland Routes or two pre-
determined High Routes which all currently form part of our existing Priority
Network. 
Priority 1 gritting routes are available on the Council website (See Appendix A). 
2.1.3 Carriageway Routes for Reactive Treatment 
a) Priority 2 – Remaining Secondary Distributor, local access and residential
distributor roads. 
Given the presence of ice and snow Priority 2 routes may be treated during normal
working hours as resources permit when sub-zero temperatures are forecast to
continue beyond midday following completion of Priority 1 routes. 
b) Priority 3 – The remaining road network including minor rural unclassified routes
and remaining residential areas not already covered.

Page 14

4 | P a g e
Priority 3 routes will be treated as resources permit when sub-zero conditions are
forecast to continue over an extended period only after all Priority 1 and Priority 2
routes are clear unless it is identified as an emergency. 
2.1.4 Carriageway Routes for Snow Clearance 
On receipt of a weather warning predicting medium (25 - 100 mm deep) or heavy
(over 100 mm deep) snowfalls, the Senior Manager (Network) where appropriate,
will recall to depots such vehicles capable of being equipped with snowploughs. 
While snow is still falling the Strategic and Main Distributor Network will be
prioritised for ploughing and treatment in order to target resources and to keep
these routes open for traffic. 
After snow has stopped falling but is lying, the remaining Priority 1 precautionary
routes will be ploughed and treated before commencing ploughing and treatment on
Priority 2 and Priority 3 routes as resources and conditions permit. 
2.1.5 Cumbrae 
There are no Roads Operatives based on the Isle of Cumbrae, however contract
arrangements have been made to carry out gritting operations on the Island.   
2.2 Footway/Footpath Priorities 
With limited resources available footways and footpaths will only be treated when
considered necessary (e.g. heavy snowfall or extensive icing).    They will normally
only be treated during normal working hours (commencing from 8:00am), but
arrangements are in place to undertake emergency work out of normal working
hours, weekends and public holidays in extreme circumstances. 
Generally, treatment of footways and footpaths will be reactionary and not pre-
planned, and where possible work will be undertaken during normal working hours. 
When treatment is instructed the following priorities will apply:- 
Priority 1 Routes will be considered for treatment if it is forecast that ice or snow is 
likely to be present or where surfaces are wet with temperatures forecast to 
remain below zero until 10:00am the next working day. 
Priority 1 Routes - Urban shopping areas and precincts, footway access to 
schools, emergency facilities including fire and rescue, 
police and ambulance services, hospitals, sheltered    
housing, doctors surgeries and health centres etc; 
Priority 2 routes will be treated if it is forecast that ice or snow is likely to be present
with temperatures forecast to remain below zero for a prolonged period only after
priority 1 routes are clear. 
Priority 2 Routes -  Steep hills on main distributor and residential distributor routes,  
routes to bus stops etc, only after all Priority 1 have been 
cleared;

Page 15

5 | P a g e
Priority 3 routes will be treated if it is forecast that ice or snow is likely to be present
with temperatures forecast to remain below zero for a prolonged period only after
priority 1 and 2 routes are clear. 
Priority 3 Routes - Other areas of high pedestrian concentration. 
Streetscene staff will assist with the treatment of footways. 
In order to maximise coverage on footways, generally only one side of a road will be
initially treated. 
It is not possible for the Council to treat all footways and footpaths within North
Ayrshire. As such the Council encourages the community to participate in self help,
through the use of grit bins which can be requested through the grit bin application
process. Grit bins will only be allocated where it has been assessed and deemed as
an appropriate location by the Council. 
2.3 Cycle Routes 
With limited manpower resources no treatment will be carried out on off road 
cycle routes. 
2.4 Response and Treatment Times 
Routine precautionary salting of priority 1 carriageway routes should be completed 
within 3 hours of the planned start time. For emergency or unplanned salting, the 
start time from leaving the depot shall be no more than 1 hour. 
3. ORGANISATION 
The Head of Neighbourhood Services is responsible for specifying the level of
winter service required based on approval from the Council. The Senior Manager
(Network) is responsible for implementing this service. 
A duty Winter Controller and Winter Supervisor will be appointed by the Senior
Manager (Network) for the whole of the winter period covered by these procedures
(mid-October to early April)

Page 16

6 | P a g e
4. NORTH AYRSHIRE COUNCIL RESOURCES (ROADS) 
4.1 General 
Following approval from the Council, it is the responsibility of the Head of
Neighbourhood Services to define the level of service to be provided within their
sphere of operations and to issue appropriate instructions to the Senior Manager
(Network) to provide the necessary labour and plant for winter operations. This level
of service will be based on the national Code of Practice for Well Manahed Highway
Infrastructure (see Appendix B). 
The level of winter treatment is established utilizing the weather forecasts provided
by MetDesk Limited in accordance with the winter treatment matrix (Appendix C). 
The Senior Manager (Network) shall thereafter be responsible for advising the Head
of Service of any matters which may affect his ability to deal with adverse weather
conditions e.g. labour disputes, extensive plant breakdowns etc. 
Labour resources from Neighbourhood Services (Roads) will be provided for the
Winter and Weather Emergencies Service. The stand-by period will be 19th October
2023 until 11th April 2024. This period may be extended beyond the given dates if
conditions warrant such action. These arrangements include home stand-by which
is activated by the designated Winter Supervisor when instructed by the Winter
Controller or as the result of hazardous road conditions being reported.  
4.2 Labour 
A proportion of the roads labour force will be on stand-by for winter service
operations out of normal working hours, with the remainder on call out as
necessary. This allows evening and early morning precautionary salting to be
carried out on our priority carriageway network to treat dangerous roads before the
morning rush hour.   
In determining the labour resources required for the winter service, cognisance is
taken of the key objective to treat all priority routes before the commencement of
the morning peak period. 
4.3 Vehicle Plant and Equipment 
Prior to commencement of winter service operations, the Senior Manager (Network)
will ensure that all equipment for salting roads and snow clearing is in working order
and, where appropriate, that ancillary items can be fitted to vehicles without
difficulty, e.g. ploughs set up on blocks to facilitate assembly. The above procedure
should also be applied to vehicles and plant available under contract for the winter
service. 
The Senior Manager (Network) will ensure that all vehicles engaged in the winter
service are equipped with radios or other appropriate communication devices to
allow contact to be maintained between the depot and operators. Superintendents
have mobile telephones. There is also vehicle tracking system fitted and operational
in all vehicles to reduce the risk associated with gritting operations.

Page 17

7 | P a g e
A summary of labour, vehicles, plant, and equipment available for the winter service
work is detailed in Appendix D. 
Once per year the Senior Manager (Network), will organise a trial closure of the
flood gates and erection of the de-mountable barriers at the Largs and Saltcoats
flood protection controls. This is to ensure that the gates and barriers remain in full
working order and that all staff are familiar with the process. 
4.4 Salt 
Salt is purchased through a Scotland Excel annual purchase contract. Mainland salt
deliveries are stored in the salt barn within the Goldcraigs Depot. Salt on Arran is
stored in the open at the Roads Depot in Market Road, Brodick.  
During the season, the Senior Manager (Network) will arrange for a weekly check to
be made on the amount of salt used and for stocks to be augmented as necessary.
There is a procedure in place at the depot to strictly control salt distribution. All
vehicles are tagged and must cross the weighbridge to accurately record salt
usage. This includes salt distributed to Streetscene and contractors assisting with
winter service delivery. 
Small quantities of salt are available for issue free of charge to the public, subject to
residents supplying a suitable container. Details of locations of community grit bins
where small quantities of salt are available are given in Appendix E 
The planned salt stock level at commencement of winter is given in Appendix F. 
In the event of prolonged severe weather, the Council has a salt resilience plan
(Appendix G), which will be implemented if conditions require. 
5. OTHER RESOURCES 
During adverse weather conditions, the Senior Manager (Network), (after
consultation with the Head of Neighbourhood Services), shall, if necessary,
augment his resources by the use of personnel from Streetscene and external
contractors at rates agreed prior to engagement through a framework contract.  The
Head of Neighbourhood Services should be advised, as soon as practicable, of
external resources engaged as a result of decisions made outwith normal working
hours. 
The Senior Manager (Network) will provide a supply of salt to Streetscene and
external contractors where appropriate to permit the treatment of agreed
footways/footpaths.  This will be managed through a salt management system
based at Goldcraigs Roads Depot.

Page 18

8 | P a g e
6. WEATHER FORECASTING 
North Ayrshire Council, through a collaborative contract led by South Lanarkshire
Council, has appointed MetDesk Limited, as their weather forecast provider.  During
the winter service period MetDesk Limited will provide a weather forecasting service
and monitor road and weather conditions.  
The forecasters receive, monitor and interpret, climatic, ice prediction and weather
radar information on a continuous basis and provide detailed weather forecasts on
a daily basis during the whole winter period. 
SEPA operate a coastal flood warning system for the Firth of Clyde.  If storm surges
and coastal flooding are predicted, SEPA provide advance warning to the Council
by e-mail and also through their Floodline service which is available on their website
or by phone.  This service is available all year round. 
7. DECISION MAKING 
The Senior Manager (Network) will appoint suitably trained and experienced
personnel as Winter Controllers. 
During the winter season the Winter Controller will receive the weather forecast
around 12.00 hours and decide on the treatment to be carried out. The Winter
Controller will check the treatment decision of neighbouring authorities for
consistency and reconsider if necessary. The weather forecast provider will provide
an evening forecast around 18.00 hours and if this update indicates any change in
the forecast the Winter Controller will amend the decision accordingly and advise
the Winter Supervisor. 
For out of office hours, Saturdays, Sundays and public holidays the Senior Manager
(Network) shall provide the weather forecast provider with contact telephone
numbers of the on duty Winter Controller. If the forecast conditions change from
good to adverse at any time, then the weather forecast provider will phone the
Winter Controller either at work or at home as appropriate. Thereafter, it is the
responsibility of the Winter Controller to take action including the calling out of
stand-by squads to undertake salting/snow clearing. 
Winter Controllers have the facility at any time to contact the weather forecast
provider for advice or clarification of forecasts. These arrangements will be in place
from 12 October 2023 until 11 April 2024 and these dates can be extended if
required. 
The decision making process is illustrated in Appendices B & C. 
The Head of Neighbourhood Services will appoint suitably trained staff and
experienced personnel to manage the coastal flood prevention schemes at Largs
and Saltcoats.  During the winter season, this will be the Winter Controller.

Page 19

9 | P a g e
8. ICE PREDICTION 
In addition to the weather forecast information, the Council has available further
information from sensors which have been installed at the locations listed below:- 
• A78 Ardrossan
• A737 Highfield
• A760 Catburn
• A735 Near Dunlop
• B880 Arran, summit of The String 
The sensors provide current details of road and air temperatures and indicate the
presence of moisture, thereby identifying locations that icing has occurred or where
there is a risk that icing will occur. 
By utilising the data from these sensors the weather forecast provider is able to
supplement their forecast by producing site specific forecasts. The above
information is available to the Winter Controller via computer link 24 hours a day
throughout the winter period. 
9. ROAD CONDITION REPORTS 
During periods of adverse weather, the Senior Manager (Network) shall receive
reports on road conditions from the Winter Supervisor by 09.45 hours. These
reports should be updated as necessary depending on changing circumstances. 
10. COMMUNICATIONS 
The Head of Neighbourhood Services or nominated senior manager will deal with
statements to the Press, Radio and Television regarding road conditions throughout
the area.  The Council’s Communication team will assist and may take the lead role
depending on the nature of any significant event. 
General advice and information, along with timeous service updates, will be placed
on the Council’s website. 
The Head of Neighbourhood Services (or nominated senior officer) will ensure that
all staff involved in communication with members of the public are fully briefed with
consistent and accurate information. 
A protocol has been agreed by the West of Scotland Regional Resilience
Partnership (WoS RRP) and Ayrshire Civil Contingencies Team (ACCT) for the
transfer of information in relation to Winter and Weather Emergencies. 
The Council’s daily winter decisions are available for the public and can be
accessed via the Council’s website.  Any winter and weather emergencies can be
reported to North Ayrshire Council and the Trunk Road Operators using the contact
information contained within Appendix H. 
The distribution list for winter weather emergencies can be found under Appendix I.

Page 20

10 | P a g e
11. ROAD CLOSURES 
Where it is considered that a road is rendered unsafe due to adverse winter
conditions then the Police or persons acting on behalf of the Chief Constable will
arrange to have the road closed and advise the on-duty Winter Supervisor as soon
as possible of their actions. The Winter Supervisor will advise the Winter
Controller/Senior Manager (Network) of any road closures. Appropriate measures
will also be taken to re-direct traffic and to ensure that the necessary signs are put
in place. When the road affected is a through route the adjoining Councils will be
kept informed. Police will advise the other emergency services (Ambulance & Fire)
of the closures. 
Prior to signing diversionary routes, the capacity of the roads and the headroom
and weight restrictions of structures should be checked with the Winter Controller to
ensure that they are adequate (see Appendix J). 
12. LIAISON WITH THE POLICE 
Neighbourhood Services (Roads) will ensure close liaison with the Police,
particularly during periods of severe weather. 
Where practicable, the Police will be informed in advance of North Ayrshire
Council’s proposed operations. Similarly, arrangements have been made for
exchanging information on proposed actions with neighbouring authorities and the
trunk road operating company. 
Where necessary the service will request appropriate assistance from the Police
when moving equipment, arranging road closures, and dealing with abandoned
vehicles. 
Reports from the Police regarding dangerous road conditions should be acted upon
by the Winter Supervisor as soon as practicable, having regard to priorities in this
document and the conditions pertaining throughout the area.

Page 21

11 | P a g e
13. AYRSHIRE LOCAL RESILIENCE PARTNERSHIP (ALRP) DISRUPTIVE
WEATHER RESPONSE ARRANGEMENTS 
There have been a number of occasions when severe weather including high
winds, heavy rain and snow has caused disruption to communities and services in
Ayrshire. Arrangements are in place where partner organisations can trigger the
ALRP Disruptive Weather Response Arrangements. The purpose of these
arrangements are:- 
• To protect human life, property, and the environment
• To implement a professional and co-ordinated multi-agency response to the
incident in conjunction with our communities
• To maintain wider public confidence in the multi-agency response and
minimise general community and infrastructure impact
• To ensuring that all possible measures are in place to protect vulnerable or
displaced members of the community
• To supporting effective public communication in regard to the incident along
the principles of warning and informing
• To ensure awareness of the potential impact of events out with Ayrshire on
the local multi-agency response
• To ensuring that organisational and partnership learning points are captured
to ensure a continuing focus on safeguarding the public 
14. CROSS BOUNDARY ARRANGEMENTS 
Because the Council boundaries do not always coincide with convenient turning
points at the end of gritting routes, arrangements have been drawn up with all
adjacent authorities for the gritting routes to be continued short distances to
appropriate turning points. See (Appendix K). 
15. VEHICLE ROUTES 
A thermal mapping exercise was undertaken on North Ayrshire’s road network over
winter season 2018/19 and routes have been developed by the Roads Service on
the basis of the priorities listed in Section 2. However, in order to minimise
unproductive mileage, some roads in a lower category may be treated out of
sequence. This may also occur when conditions vary throughout the area. 
A complete set of route cards will be kept in the Commercial Services (Roads)
offices, with a duplicate set being held in Goldcraigs Depot. 
Treatment of precautionary carriageway salting routes should be completed within
three hours of planned start time under routine conditions. When the Winter
Controller instructs immediate winter service operations, the response time to start
treatment should be within one hour. 
It should be noted that gritting routes are either at or close to capacity and it is
unlikely that any additions to routes could be considered without additional finance
and human resources.

Page 22

12 | P a g e
16. PRECAUTIONARY SALTING 
On receipt, within normal working hours, of a forecast from the weather forecast
provider warning of frost, freezing or snow conditions, the Winter Controller in
consultation with the Senior Manager (Network), shall give consideration to
precautionary salting of main roads. 
Where such a warning is received out with normal working hours, the Winter
Controller has delegated authority to activate call-out procedures as indicated in
Section 7. 
Extensive and accurate records of weather forecasts, winter treatment decisions
and actions taken will be kept to demonstrate our compliance to our Winter and
Weather Emergencies Plan. 
17. GRIT BINS 
There are approximately 500 grit bins distributed across North Ayrshire. These are
located at areas of particular difficulty e.g. dangerous bends, steep gradients etc.
The policy and procedures for siting of grit bins, and requests for additional bins is
shown in Appendix L. 
Grit bins will be refilled prior to the start of winter and as considered necessary
during the winter season and following periods of severe weather when resources
are available. 
The locations of Community Grit Bins are listed in Appendix E. 
18. LARGS AND SALTCOATS FLOOD PROTECTION SCHEMES 
On receipt of a severe weather warning predicting a combination of strong winds,
high tides or tidal surges the Winter Controller will, when necessary, instruct the
closure of the flood gates on the promenade at Largs and/or the erection of the
flood barriers at the Largs Pier and/or Saltcoats promenade. 
19. SANDBAG PROCEDURES 
The deployment of sandbags to prevent or contain floodwaters can be an effective
way of mitigating the effect of a flood, however the lead time for filling and
deployment can be lengthy, as a large number of bags cannot be filled in advance
due to storage problems. Therefore, an early decision must be taken to sandbag, to
avoid a subsequent waste of time and effort. The deployment of sandbags will be
decided with regard to the following priorities: 
1. To prevent loss of life or serious injury 
2. Maintenance of access for the emergency services 
3. Protection of vital facilities within the community 
4. Protection of transportation routes 
5. Protection of NAC property 
6. Protection of private dwelling houses

Page 23

13 | P a g e
The decision to deploy sandbags will be made by the Winter Controller / Supervisor
or appropriate officers in Building Services, Cleansing or the Island Officer on Arran
in accordance with the Services' callout/emergency procedures. 
Notes: 
1. Sandbags will not normally be deployed to protect commercial property;
2. Appropriate stocks of empty and filled sandbags will be held by the Services
mentioned above, based on previous usage and experience. 
The above procedure mainly relates to tidal, fluvial and watercourse flooding. 
Where flooding occurs as a result of a blocked, damaged or ineffective Council
owned drainage systems, sandbags will be deployed as required to mitigate the
effects of flooding (and reduce the likelihood of claims against the Council) including
the protection of commercial property. 
20. Resilience Arrangements 
In critical situations should our operational resources be reduced, a minimum
resilience network for winter gritting has been prepared. Should we have to reduce
our level of service due to an extreme situation our priority gritting routes will reduce
from 6 to 3. On Arran we may require reducing from 2 to I gritting vehicle covering
the island routes and the treatment time for gritting operations will increase
accordingly. 
The Head of Service will decide if the level of service has to be reduced due to
extreme situations. 
Details of our resilience network are attached as Appendix M.

Page 24

14 | P a g e
Appendix A 
Priority 1 Carriageway Gritting Routes 
Policy & Procedure 
Priority 1 Gritting Routes can be viewed on the Councils website using the following
address:- 
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx

Page 25

15 | P a g e
Appendix B 
LEVEL OF SERVICE 
Road Surface
Temperature
Precipitation Predicted Road Conditions  
Wet Wet Patches Dry 
Temperature
Forecast 
between
+1.5oC
And +0.5oC 
No Rain
No Hoar Frost
No Fog 
High Route Patrols  No action likely 
Temperature
Forecast 
below +0.5oC 
No Rain
No Hoar Frost
No Fog 
(Priority  1 Routes) 
Salt before frost  Expected
Hoar Frost
Expected Fog 
Expected rain
BEFORE
freezing 
(Priority  1 Routes) 
Salt after rain stops 
Expected rain
DURING
freezing
(Priority  1 Routes) 
Salt before frost, as required during rain and after
rain stops 
Possible rain
Possible hoar
frost
Possible fog
(Priority  1 Routes) 
Salt before frost 
Monitor
weather
conditions 
Expected Snow Fall
(Priority  1 Routes and footways) 
Salt before snow fall 
The decision to undertake precautionary treatments should be adjusted, where
appropriate, to take account of residual salt. 
All decisions should be evidence based, recorded and continuously monitored and
reviewed.

Page 26

16 | P a g e
Appendix C 
DECISION MAKING 
Rate of spread for precautionary treatments may be adjusted to take account of local
variations along the routes such as residual salt, temperature variations, surface moisture
(air or road surface) road alignment and traffic density. 
All decisions should be evidence based, recorded and require continuous monitoring and
review. 
Ice refers to all ice on the road surface, including black ice. 
The level of service generally complies with the recommendations laid down in “NWSRG 
best practice guide for Winter Salt” as recommended in the Well Managed Highway 
Infrastructure Code of Practice and takes account of recommendations by the SCOTS
Winter Group following a review of the Code of Practice and consultation with the National
Winter Service research Group (NWSRG). 
WINTER TREATMENT SPREAD RATE MATRIX 
Recommended Spread Rates – Dry Salting (g/m2) 
Road Surface Temperature
(RST) when frost/ice is
predicted and road wetness.
Poor Cover
(salt stored 
uncovered) 
Medium Traffic 
Normal Loss
Good Cover
(salt stored 
under cover) 
Medium
Traffic 
Normal Loss 
Comments
RST at or above -2 deg and dry
or damp road conditions  10  10 
RST at or above -2 deg and 
wet road conditions  15  10 
RST below -2 deg and above - 5
deg and dry or damp road
conditions 
(15 or 20)  (10 or 15)
Spread rate dependent on 
residual salt on road surface
RST below -2 deg and above - 5
deg and wet road conditions
(1 x 20 & monitor
& treat as
required) 
20 
RST at or below -5 deg and 
above -10 deg and dry or 
damp road conditions
(1 x 20 & monitor
& treat as
required) 
20
Spread rate dependent on 
residual salt on road surface
RST at or below -5 deg and 
above -10 deg and wet road 
conditions
(1 x 20 & monitor
& treat as
required)
(1 x 20 &
monitor & treat
as required)

Page 27

17 | P a g e
Salt Type
Precautionary
Treatments Before
Snow or Freezing
rain  
Light or Medium
Traffic Heavy Traffic    
Dry Salt
Light Snow Forecast
20g/m2 20g/m2
Pre-wet
Salt 20g/m2 20g/m2
Treated
Salt 15g/m2 15g/m2
Dry Salt
Moderate/Heavy
Snow Forecast
20g/m2 40g/m2
Pre-wet
Salt 20g/m2 40g/m2
Treated
Salt 15g/m2 30g/m2
Dry Salt
Freezing rain
Forecast
1 x20g/m2 then monitor
Pre-wet
Salt 1 x20g/m2 then monitor
Treated
Salt 1 x15g/m2 then monitor

Page 28

18 | P a g e
Appendix D
SUMMARY OF AVAILABLE LABOUR & PLANT 
TYPE OF PLANT  GOLDCRAIGS  ARRAN  OTHER
NAC 
TOTAL
Gritters 
18 Tonne Uni-body 10 3  13
7.5 Tonne Uni-body 1 0  1
Trailer Gritter 0 0 1 1
Footway Gritter  1 1 7 9
Lorries 
18 Tonne Uni-body
26 Tonne Multi-lift
10
1
3
0
13
1
7.5 Tonne Uni-body 1 0  1
Tractor 0 1  1
JCB 2CX 0 1  1
Telehandler  1 1  2 
Ploughs 
Fixed V 3 2  5
Small Blade 1 1  2
Large Blade 12 3  15 
LABOUR    
Drivers 
Pickup Drivers
Operatives 
22
7
4 
6
3 7
36
28
17
40
Other Equipment    
Muck Truck + plough
(For footways)  
2 2     
Note   
When necessary labour, vehicles, plant and equipment from other 
Council Departments, farmers, plant hirers and contractors will be used 
to supplement above resources. 
This also applies for non-winter related emergency responses.

Page 29

19 | P a g e
Appendix E 
COMMUNITY GRIT BINS 
Small quantities of salt are available for issue free of charge to members of the public,
subject to their supplying a suitable container from the Community Grit Bins sited at the
following locations. 
Town Location
Ardrossan Carpark, North Crescent Road.
Beith Community Centre, Kings Road.
Brodick Household Waste Recycling Centre
Dalry Car Park, Kirk Close.
Fairlie Car Park, Pier Road. 
Irvine Bartonholm Civic Amenity Site.
Kilbirnie Cleansing Depot, Paddockholm Road.
Kilwinning Byrehill Place (off Pennyburn Road)
Lamlash Council Office
Largs Cleansing Depot, Alexander Avenue.
Millport Kepple Pier
Saltcoats Cleansing Depot, Mid Dykes Road.
Skelmorlie Toward View (opposite Fire Station).
Stevenston Car Park, Garnock Road.
West Kilbride Community Centre, Corse Street.

Page 30

20 | P a g e
Appendix F 
SUMMARY OF AVAILABLE MATERIALS 
The following salt, grit and sand stocks will be in place at commencement of winter:- 
DEPOT TONNAGE
SALT
TONNAGE SAND 
(for Sandbags) 
Goldcraigs  (salt barn) 6500  100 
Arran  2400 300 
Cumbrae   20 (500 filled sandbags) 
Approximately 4000 sandbags are located at Goldcraigs, and 500 on Arran.

Page 31

21 | P a g e
Appendix G 
Salt Resilience Plan (Mainland) 
Level  1 (Green) Service – Stock Levels 2500 Tonnes and above 
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 470T – resilience 5 days                                                      
or
• Typical daily salt usage (frost & ice only) 235T – resilience 10 days 
Level  2 (Amber 1) Service – Stock Levels 1800 Tonnes – 2500Tonnes 
• Only Priority 1 carriageway routes treated with pure salt, remaining priority carriageway
routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 330T – resilience 2 days.                                                    
or
• Typical daily salt usage (frost & ice only) 165T – resilience 4 days 
Level  3 (Amber 2) Service – Stock Levels 1000 Tonnes – 1800 Tonnes 
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix at 50/50
• Typical daily salt usage (snow conditions) 150T – resilience 5 days.
or
• Typical daily salt usage (frost & ice only) 75T – resilience 10 days 
Level 4 (Red) Service – Stock Levels less than 1000Tonnes 
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at 50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 100T – resilience 10 days
or
• Typical daily salt usage (frost & ice only) 50T – resilience 20 days 
Assuming 7000 tonnes in stock at start of winter our total resilience would be either 
• Total Resilience during periods of heavy snow - 27 days
or
Total Resilience during periods of frost & ice conditions - 54 days

Page 32

22 | P a g e
Salt Resilience Plan (Arran) 
Level  1 (Green) Service – Stock Levels 1000 Tonnes and above 
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 52T – resilience 10 days                                                      
or
• Typical daily salt usage (frost & ice only) 26T – resilience 20 days 
Level  2 (Amber 1) Service – Stock Levels 550 Tonnes – 1000Tonnes 
• Only Priority 1 carriageway routes treated with pure salt, remaining priority carriageway
routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 44T – resilience 10 days.                                                      
or
• Typical daily salt usage (frost & ice only) 22T – resilience 20 days 
Level  3 (Amber 2) Service – Stock Levels 250 Tonnes – 550 Tonnes 
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50
• Typical daily salt usage (snow conditions) 30T – resilience 10 days.
or
• Typical daily salt usage (frost & ice only) 15T – resilience 20 days 
Level  4  (Red) Service – Stock Levels less than 250 Tonnes 
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at 50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 20T – resilience 12 days
or
• Typical daily salt usage (frost & ice only) 10T – resilience 25 days 
Assuming 1,900 tonnes in stock at start of winter our total resilience would be either 
• Total Resilience during periods of heavy snow  - 49 days
or
Total Resilience during periods of frost & ice conditions - 98 days

Page 33

23 | P a g e
Appendix H 
NORTH AYRSHIRE COUNCIL 
CONTACT ADDRESS & TELEPHONE NUMBERS 
During Normal Working Hours  Outwith Normal Working Hours 
MAINLAND 
Neighbourhood Services
(Roads) 
Cunninghame House
IRVINE
KA12 8EE 
Tel:  01294-310000 
NORTH AYRSHIRE COUNCIL
CALL CENTRE 
Road & Lighting Faults 
24 hours, 7 days per week 
Tel:   01294 310000 
ARRAN 
Arran Local Office
Lamlash
Isle of Arran
KA27 8JY 
Tel:  01770-600338
Fax: 01770-600028 
TRUNK ROADS
A78, A737 & A738 
Amey
Network Control Centre
150 Polmadie Road
Glasgow
G5 OHD 
Control Room
0800 042 0188
OCCR-southwest@amey.co.uk

Page 34

24 | P a g e
Appendix I 
DISTRIBUTION LIST 
Copies 
North Ayrshire Council
Chief Executive 1
Executive Director: Place 1
Executive Director: Communities & Education 1 
Head of Neighbourhood Services 1
Head of Housing and Public Protection 1
Head of Democratic Services 1
ACCT 1
All Elected Members of North Ayrshire Council    33 
Police Scotland
Divisional Commander, Kilmarnock    1
Traffic Management, Ayr    1 
Strathclyde Partnership for Transport    1 
Scottish Fire & Rescue Service – Divisional Commander     1 
Scottish Ambulance Service    1 
MetDesk Limited    1 
Amey    1 
Ayrshire Roads Alliance     1   
Renfrewshire Council - Head of Roads    1 
East Renfrewshire Council – Head of Roads & Planning    1 
Inverclyde Council – Head of Transportation & Roads Service    1 
Contact Centre, Building Services, Stevenston    1 
Contact Centre, Bridgegate House, Irvine    1

Page 35

25 | P a g e
Appendix J 
BRIDGES WITH WEIGHT OR HEIGHT RESTRICTIONS 
HEIGHT RESTRICTIONS 
Bridge Location Grid Reference Signed Height  
Metric Imperial
B714/50 : Dalry, Railway Bridge 229960  649702 3.8 12’ – 6”
B706/40 : Barrmill 236834  651392 4.0 13’ – 0”
B7047/10 : Meadowfoot Road, West Kilbride 220791  647032 4.6 15’ – 0”
C6/10 : West Balgray 235333  642491 3.9 12’ – 9”
C26/10 : South Kilruskin 220541  650473 4.4 14’ – 6”
C26/20 : North Kilruskin 220423  650868 5.0 16’ – 6”
U67/10 : Dubbs 228508  642006 3.0 9’ – 9”
U67(A78 280) : Todhill (Dubbs Road, under
A78, Kilwinning Bypass)
229175  642250 4.0 13’ – 0”
U67/30 : Nethermains 230059  642199 3.7 12’ – 0”
C56/30 : Moor Road 220639  652980 4.7 15’ – 6”
C67/20 : Tandelhill 238174  651683 4.4 14’ – 3”
C99/20 : Cockenzie 230694  646241 3.0 10’ – 0”
Unc.TG/230 : Garnock View, Glengarnock 231875  653191 3.8 12’ – 6”
Unc.TI/70 : Old Church Street, Irvine 213571  638800 4.0 13’ – 3” 
WEIGHT RESTRICTIONS 
Bridge Location Grid Reference Signed Weight 
B781/30 : West Kilbride, Dalry Road 221015  649062 7.5T
C129/20 : Floors, north of Kilmaurs 240866  641921 17T
C99/30 : Dusk Bridge, near Dalry 230599  646882 7.5T
Unc.TL/30 : Largs, May Street 220711  658602 7.5T
U16/10 : Dalgarven Mill Bridge, north of
Kilwinning, (formerly Unc.NC/30)
229571  645847 26T
U23 : Fairliecrevoch Bridge, Perceton, Irvine 236065  642011 3T
Unc.NT/10 : Barrmill 236472  650997 3T (Not Adopted)
U54/30 : Sevenacres Mill Bridge, Kilwinning 233123  643810 Currently being
replaced.

Page 36

26 | P a g e
Appendix K 
ARRANGEMENTS WITH OTHER AUTHORITIES 
ROADS TO BE TREATED BY
ADJACENT AUTHORITIES 
ROADS TO BE TREATED BY
NORTH AYRSHIRE COUNCIL 
Ayrshire Roads Alliance (East
Ayrshire) 
A71 – from boundary westwards to
Corsehill roundabout. 
A735 – that section within North
Ayrshire boundary. 
B769 – from boundary south
westwards to Chapeltoun junction. 
C129 – that section within North
Ayrshire boundary. 
C20 – that section within North
Ayrshire boundary. 
B706 - from boundary to A736 
C117 From Chapeltoun Bridge to
Wheatrig Bridge 
South Ayrshire 
U107 from the South Ayrshire Council
boundary at the railway bridge to A759
Auchengate Interchange. 
East Ayrshire 
A736 – from Caldwell Bridge southwards to
Lugton. 
A736 – from B778 junction south
eastwards to Torranyard. 
C24 - from Greenhill Terrace, Knockentiber
to boundary at Plann Bridge. 
C126 From Montgreenan Bridge to North
Lodge. 
Knockentiber Road from boundary near
Springside to junction with C24 
Roads to be Treated by Ayrshire
Roads Alliance (South Ayrshire) 
B730 from the North Ayrshire Council
boundary at the railway bridge south of
Drybridge to junction Shewalton Road,
Drybridge. 
Renfrewshire Council 
A760 – from boundary to Kerse Road
junction, 
Kerse Road – from boundary to A760
junction 
Note:  There are no cross boundary arrangements with East Renfrewshire Council.

Page 37

27 | P a g e
Appendix L 
GRIT BIN POLICY & PROCEDURE 
1. North Ayrshire Council shall provide grit bins for self-help by members of the public.
These shall be sited locally in accordance with this policy. 
2. Grit bins shall only be located where the following criteria are met: - 
• The location is not on a precautionary carriageway route;
• The gradient is greater than 1 in 10, or at a junction with a known history of
accidents;
• The location shall not obstruct the passage of pedestrians, a minimum of 1.5m
clearance on the footway is required;
• The location shall not obstruct sight lines;
• The location is not within 200m of another grit bin location;
• The location is within an urban area;
• The location is within the boundary of the public road. Infrastructure and Design will
not provide grit bins in private areas or car parks for internal use by either the
Council or any other public or private property such as schools, parks, hospitals, old
people’s homes, etc. unless a service level agreement is in place. 
3. Grit bins will only be located where they can be filled from a lorry. The grit bins shall be
replenished at the start of the winter period and on a monthly cycle during the winter
period, as resources permit. 
4. Grit bins will generally be left in place during the summer months unless there is a
history of vandalism at a particular location. 
5. The location of grit bins will be recorded in an electronic database, which will be made
available on the North Ayrshire Council website. 
6. Only written requests on the Council’s Grit Bin Application Form will be considered,
these are available from the Head of Neighbourhood Services, Cunninghame House,
Irvine, KA12 8EE, and on the Council’s website. 
7. A request will not be accepted unless a location to site the grit bin has been agreed.
Therefore, even if the criterion for locating a grit bin is met, a grit bin will not be
provided if the adjacent residents cannot agree a position. The signed agreement of
adjacent residents must be included on the submitted application form, otherwise the
application will not be considered. 
8. Grit Bin Application forms are available on the Council’s website at 
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx

Page 38

28 | P a g e
Appendix M 
Resilience Network