NORTH AYRSHIRE COUNCIL 
7 November 2023 
Cabinet 
Title:    Revenue Budget 2023/24 : Financial Performance to 31
August 2023 
Purpose:  To advise Cabinet of the financial performance for the Council
at 31 August 2023. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; and 
(c)  approve the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2023/24 were approved by Council on 1
March 2023. The Housing Revenue Account (HRA) Revenue Budget for 2023/24 was
approved by Council on 15 February 2023. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the second report for 2023/24 and covers the period to the end of
August 2023 (Period 5). Projections have been made to the year-end. 
1.3   At Period 5 the General Fund is forecasting a net in-year overspend of £0.424m,
(0.1%), after transferring resources to/from earmarked reserves. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£5.414m),
(9.3%). 
1.5  At the end of July 2023, the Health and Social Care Partnership is projecting a year-
end overspend of £3.859m, (1.2%), for 2023/24, a reduction of (£0.717m) from the
previously reported position. The Council services element is reporting a projected
overspend of £3.507m, which is an improvement of (£0.330m) from the previously
reported underspend, and the Health services element is reporting a projected
overspend of £0.352m, which is an improvement of (£0.387m) over the same period.

Page 2

1.6 Significant risks to the reported position have been identified arising from ongoing
inflationary pressures across services, linked to the higher than anticipated Consumer
Price Index, and the potential impact of the ongoing 2023/24 non teacher pay
negotiations. However, it is anticipated that any additional costs arising from these
negotiations will be matched by additional Scottish Government grant funding. The
financial projections do not include any short term reductions resulting from the
industrial action taken by non-teaching staff on 26th, 27th and 28th September 2023.
The full impact of this will be quantified and incorporated into future reports. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2023/24. In addition to the budget approved
on 1 March 2023, earmarked funds of £26.697m were carried forward from 2022/23
for service expenditure in 2023/24 and are reflected in the figures within the 2023/24
financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year overspend of £0.424m, (0.1%),
net of transfers to/from reserves, is anticipated for the year to 31 March 2024. 
2.3 Details of the current financial projections are summarised in the following table: 
Appendix
No
Annual
Budget
Projection
to  31
March 2024
Projected
Variance
for year
(Fav)/Adv
Projected
Variance @
Period 3 
(Fav)/Adv Movement Note
Service Expenditure £000's £000's £000's £000's £000's
Chief Executives 1 19,931     19,663      (268)        (58)             (210)        (i)
Communities 2 183,813   184,203     390         -                390         (ii)
Place 3 55,308     56,316      1,008       1,691         (683)        (iii)
Other Corporate Services 4 20,717     20,011      (706)        (831)           125         (iv)
Sub Total 279,769   280,193     424         802            (378)       
Health and Social Care
Partnership 8 121,744   121,744     -              -                -              2.6
Balance for Services 401,513   401,937     424         802            (378)       
Financing Charges 5 11,408     11,408      -              -                -             
Contribution to Loans Fund
Reserve 5 6,132       6,132        -              -                -             
Total Planned Expenditure 419,053   419,477     424         802            (378)       
Planned Income
Aggregate External Finance 5 (347,490)  (347,490)    -              -                -             
Council Tax 5 (65,397)    (65,397)     -              -                -             
Use of Earmarked Funds 5 (6,166)      (6,166)       -              -                -             
Total Planned Income (419,053)  (419,053)    -              -                -             
Net Expenditure/ (Income) -              424           424         802            (378)

Page 3

2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that included in the approved budget, as detailed in the
following table: 
2.5 Commentary on Significant Movements from the Approved Budget 
The Council's overall financial forecast against the revised budget is a net overspend 
position. This includes a number of movements at a service level. Detailed
explanations of the significant variances in service expenditure compared to the
approved budgets are provided in appendices 1 to 5 to this report. 
A brief explanation of the significant movements for each service since Period 3 is
outlined as follows: 
(i) Chief Executive’s – underspend of (£0.268m), an increase of (£0.210m) from
the previously reported underspend 
The movement since Period 3 is primarily related to lower than forecast contract
renewal costs within ICT. 
(ii) Communities – overspend of £0.390m, an increase from the previously
reported breakeven position 
The movement since Period 3 reflects updated cost pressures across services,
including: 
• Additional employee costs associated with maintaining teacher numbers in line
with Scottish Government policy and absence cover arrangements, £1.014m;
and
• Additional net costs in relation to the PPP contract due to NDR revaluations and
higher than anticipated contract inflation, £0.160m. 
These have been partly offset by: 
• Vacancy management across services, including Early Learning and Childcare
and non-teaching costs within schools combined with a targeted reduction in
overtime and casual staff costs, (£0.623m); and 
• Lower than anticipated demand for placements with ELC funded providers,
(£0.199m).
Non Domestic
Rates
Specific
Grants TOTAL AEF
Planned Income £000's £000's £000's
Revised Budget 30 June 2023 (281,872)       (40,982)         (19,930)         (342,784)      
Movements:
SNCT Pay 22-23 / 23-24 (4,110)           (4,110)          
Ukrainian Resettlement (70)               (70)              
Summer Activities (132)             (132)            
Employability Staffing (394)             (394)            
Revised Planned Income (286,578)       (40,982)         (19,930)         (347,490)      
General Revenue
Grant
£000's

Page 4

Significant cost pressures continue to be experienced in relation to : 
• Increased residential childcare placements, £0.905m; and
• Significant costs pressures arising from the demand for Classroom Assistants,
£0.874m. 
These are currently being offset on an interim basis through the utilisation of
earmarked reserves. However, it is recognised that this is not a sustainable
solution and will require to be addressed through ongoing discussions with the
Scottish Government, management action and as part of the 2024-25 budget
process. 
(iii) Place – overspend of £1.008m, a reduction of (£0.683m) from the previously
reported overspend 
The movement since Period 3 reflects updated income and cost forecasts across
services, including: 
• Additional income from kerbside recycling contracts, (£0.333m);
• Additional rent income linked to increased demand for Temporary Furnished
Accommodation, (£0.081m); and
• Reduced Property Management and Investment expenditure linked to a
forecast reduction in internal recharges, (£0.069m). 
Virements in relation to the recognition of additional income within Roads have
been included within Appendix 7. 
(iv) Other Corporate Items – underspend of (£0.706m), a reduction of £0.125m
from the previously reported underspend 
The movement since Period 3 is primarily related to additional drawdown from
centrally held inflationary cost provisions to support pressures within services,
£0.249m, partly offset by revised Housing Benefit Overpayment Recovery
projections, (£0.100m). 
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of July 2023 is
attached at Appendix 8. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised as: 
• The projected outturn is a year-end overspend of £3.859m for 2023/24, a
reduction of (£0.717m) from the previously period.
• The projected overspend on the Council Services element is £3.507m, a reduction
of (£0.330m), with a projected overspend on the Health Services element of
£0.352m, a reduction of (£0.387m);

Page 5

• The most significant areas of overspend include residential placements for
children, supplementary staff in wards and complex residential care packages
within the lead partnership for mental health. Further detail is included in the
report at Appendix 8. 
The main areas of risk identified in the report include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers;
• High risk areas of low volume / high-cost services areas e.g. Children’s residential
placements, Learning Disability care packages and complex care packages; 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this;
• Ongoing implementation costs of the Scottish Government policy directives;
• Lead / hosted service arrangements, including managing pressures and reporting
this across the 3 IJBs;
• The impact on Lead Partnership and acute services from decisions taken by other
Ayrshire areas;
• The Covid recovery process including the ability to change and improve services
following learning from the Covid response;
• Continuing risks associated with provider sustainability;
• The Local Government pay award is not settled for 2023-24 and negotiations are
ongoing, any increase above the budgeted 3% will impact on the financial position
unless additional funding is forthcoming. 
These risks will be monitored during 2023-24 and any impact reported through the
financial monitoring report 
Risks 
2.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to essential commodities, including food, and contractor costs. In
June 2023, Cabinet agreed to earmark £0.870m from the 2022/23 underspend to
address unbudgeted inflationary pressures arising from the ongoing cost of living
crisis. Any further increases beyond current budget provision may impact on future
service provision. 
Negotiations in relation to the 2023/24 pay settlement for non-teaching staff are
currently ongoing. It is anticipated that any additional costs arising from these
negotiations will be matched by additional Scottish Government grant funding,
however, the final impact of any award in excess of available funding may require the
utilisation of Council reserves, with a knock-on effect on future budget gaps. These
pressures are likely to be offset in the short term by reductions resulting from the
industrial action taken by non-teaching staff on 26th, 27th and 28th September 2023.
However, the full impact cannot be quantified at this time. The net risks arising from
any settlement will continue to be monitored and reported to Cabinet as appropriate.

Page 6

Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2023/24 and an
in-year underspend of (£5.414m), (9.3%), is currently anticipated for the year to 31
March 2024. The projected position is summarised in the following table with further
details provided in Appendix 6. 
2.9 Commentary on Significant Movements from the Approved Budget 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Employee Costs – underspend of (£0.295m), a reduction from the previously
reported breakeven position 
The movement is primarily related to vacancy management across the service. 
(ii) Property Costs – overspend of £1.038m, an increase from the previously
reported breakeven position 
The movement is primarily related to a projected overspend on Void repairs,
£1.007m, resulting from an increase in the volume and scope of works. 
(iii) Capital Financing Costs – underspend of (£7.127m), an increase of
(£0.764m) from the previously reported underspend 
The movement is primarily related to reduced loan charges, reflecting the
utilisation on internal funds rather than borrowing, and further rephasing within the
HRA capital programme. 
(v) Income – underrecovery of £0.970m, an increase from the previously
reported breakeven position
The movement is primarily related to a projected underrecovery of rental income,
£0.958m, resulting from long term voids. 
Annual
Budget
Projection to 
31 March
2024
Projected
Variance for
year
(Fav)/Adv
Previous
Variance @
Period 3       
(Fav)/Adv Movement Note
£000's £000's £000's £000's £000's
Employee Costs 5,504        5,209          (295)             -                 (295)          (i)
Property Costs 22,717      23,755        1,038           -                 1,038        (ii)
Supplies and Services 672          656             (16)              -                 (16)           
Transport and Plant Costs 28            28              -                  -                 -              
Administration Costs 1,892        1,908          16               -                 16            
Third Party Payments 3,519        3,519          -                  -                 -              
Transfer Payments 172          172             -                  -                 -              
Other Expenditure 380          380             -                  -                 -              
Capital Financing 23,309      16,182        (7,127)          (6,363)         (764)          (iii)
Gross Expenditure 58,193      51,809        (6,384)          (6,363)         (21)           
Income (58,193)     (57,223)       970              -                 970           (iv)
Net Expenditure -               (5,414)         (5,414)          (6,363)         949

Page 7

3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a)  note the information and financial projections outlined in the report; 
(b)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; and
(d)  approve the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 31 August 2023 is a net overspend of £0.424m. 
Housing Revenue Account
The net projection for the year as at 31 August 2023 is a net underspend of
(£5.414m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None.

Page 8

5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2023/24 : Financial Performance to 30 June 2023 – Cabinet 29 August
2023

Page 9

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 144              149              5                     3%
Total for Chief Executive 144              149              5                     3%
Financial Services
Change Programme 81                81                -                      0%
Audit, Fraud, Safety & Insurance 699              716              17                   2%
Corporate Procurement 974              939              (35)                  (4%)
Financial Services 1,450           1,450           -                      0%
Revenues (500)             (500)             -                      0%
Transformation 740              740              -                      0%
Total for Financial Services 3,444           3,426           (18)                  (1%)
People & ICT
Employee Services 900              917              17                   2%
HR & Organisational Development 1,072           1,084           12                   1%
ICT 5,311           5,116           (195)                (4%) 1         
Business Support 1,258           1,258           -                      0%
Customer Services 3,981           3,981           -                      0%
Total for People & ICT 12,522         12,356         (166)                (1%)
Democratic Services
Legal & Licensing 496              486              (10)                  (2%)
Policy, Performance & Elections 468              401              (67)                  (14%) 2         
Communications 469              472              3                     1%
Civil Contingencies 60                60                -                      0%
Committee Services 541              528              (13)                  (2%)
Member Services 1,320           1,320           -                      0%
Ayrshire Support Service 410              416              6                     1%
Information Governance 57                49                (8)                    (14%)
Total for Democratic Services 3,821           3,732           (89)                  (2%)
Totals 19,931         19,663         (268)                (1%)

Page 10

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 16,985         16,921         (64)                  (0%)
Property Costs 67                69                2                     3%
Supplies and Services 3,081           2,888           (193)                (6%)
Transport and Plant Costs 24                24                -                      0%
Administration Costs 1,361           1,359           (2)                    (0%)
Other Agencies & Bodies 2,336           2,333           (3)                    (0%)
Transfer Payments 853              852              (1)                    (0%)
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 24,707         24,446         (261)                (1%)
Income (4,776)          (4,783)          (7)                    0%
Net Expenditure 19,931         19,663         (268)                (1%)

Page 11

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 People & ICT - ICT
Movement - There has been a favourable movement of £0.195m due to lower than forecast contract renewal
costs.
2,248 (195) -9%
Supplies & Services - £0.152m underspend in Software Licenses and support due to contracts ending and 
renewing at a lower cost.  However it is anticipated that the cost of Office 365 licensing will increase by 20% in
2024/25 requiring this years underspend to be earmarked to cover some of this increase. £0.043m underspend
in WAN due to the upgrade project although reinvestment of this budget is required to improve network
bandwidths at a number of council sites.
(195)               
Note 2 Democratic Services - Policy, Performance & Elections
Movement - There is a favourable movement of £0.010m in employee costs, this is due to slippage in
vacancies
447 (67) -15% Employee Costs - There is an underspend of £0.067m due to vacancy management.
(67)

Page 12

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 20,747         20,271            (476)                (2%) 1         
Primary Education 48,366         48,036            (330)                (1%) 2         
Secondary Education 61,492         61,415            (77)                  (0%) 3         
Additional Support Needs 13,730         14,312            582                 4% 4         
Education - Other 4,368           5,524              1,156              26% 5         
Pupil Equity Fund 4,604           4,604              -                      0%
Facilities Management 17,705         17,240            (465)                (3%) 6         
Connected Communities 12,801         12,801            -                      0% 7         
Net Total 183,813       184,203          390                 0%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 95,964         97,427            1,463              2%
Employee Costs - Non Teachers 57,629         55,915            (1,714)             (3%)
Property Costs 1,418           1,449              31                   2%
Supplies and Services 24,744         24,387            (357)                (1%)
Transport and Plant Costs 156              159                 3                     2%
Administration Costs 562              560                 (2)                    (0%)
Other Agencies & Bodies 13,798         14,418            620                 4%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 71                63                   (8)                    (11%)
Gross Expenditure 194,922       194,958          36                   0%
Income (11,109)        (10,755)           354                 (3%)
Net Expenditure 183,813       184,203          390                 0%

Page 13

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been a favourable movement of £0.478m compared to P3. This is primarily due to
vacancy management and changes in Funded Provider projections.
15,854 (274) -2% Employee Costs: Projected underspend of £0.515m in Early Years establishments due to vacancy
management which is offset against a projected overall Early Years budget shortfall of £0.242m.
4,672 (199) -4%
Third Party Payments: There is a projected underspend of £0.199m within payments to Funded Providers as a
result of a reduction in the number of NAC children accessing early years placements.
246 (3) -1% Other minor movements
A reduction to the budget of £1.198m in 23/24 has necessitated a drawdown from Education earmarked funds
pending permanent savings to be implemented for 24/25. Service redesign proposals are being developed.
(476)
Note 2 Primary Education
Movement : There has been an unfavourable movement of £0.065m compared to P3.   This is due to NDR re-
evaluations and increased RPI utility costs within the PPP Unitary Charge. This will be monitored over the
coming months and will be dependent on potential further PPP deductions income to offset the overspend.
45,985 (381) -1% Employee Costs : projected underspend in non teaching costs across all Primary Schools
2,222 62 3% Supplies & Services: projected overspend in the PPP unitary charge mainly due to NDR and utility increases
(11) Other minor movements
(330)
Note 3 Secondary Education
Movement : There has been a favourable movement of £0.031m compared to P3.   This is mainly due to
continuing recruitment gaps and vacancy management (£0.148m) and additional costs of £0.118m in NDR re-
evaluations and increased RPI utility costs within the PPP Unitary Charge.
46,742 (198) 0% Employee Costs : projected underspend in non teaching costs across all Secondary Schools
14,584 118 1%
Supplies & Services: projected overspend in the PPP unitary charge mainly due to NDR and utility increases.
All PPP costs and income will be monitored over the coming months and the final outturn will be dependent on
potential further penalty deductions to offset the overspend.
3 Other minor movements
(77)
Note 4 ASN
Movement: There has been an favourable movement of £0.054m compared to P3. This is mainly due to
movements in staff costs.
11,830 (284) -2%
Employee costs:  Projected underspend of £0.284m in non teaching staff costs across all ASN school and
bases provision. The increased cost pressure for Classroom Assistants of £0.874m is managed this year by
drawing down a temporary amount from earmarked funds. This position will be addressed as part of the
ongoing discussion with the Scottish Government and as part of the 24/25 budget process.
355 (76) -21% There is a forecasted underspend of £0.076m on payments to Other Local Authorities due to a reduction in the
number of NAC children accessing placements in their establishments.
1,003 49 5% There is a projected overspend of £0.049m on external day placements as a result of additional children
requiring this level of support and an increase in rates from these establishments.
499 905 181%
There is a projected overspend of £0.905m on external specialist residential placements.  Currently there are
10 children in accommodation with an additional 2 expected in the near future; 2 children have left education
provision in June 2023.  Increased pressures on internal care settings as well as changing needs of children
and young people have resulted in an increase in the need for external residential settings. Joint working is
ongoing with HSCP to ensure that all options are fully explored to ensure that all options are considered to
retain young people within their local community where possible.  Where this is not possible, a forum has been
set up to further discuss those young people who will require care and education provision to support them
appropriately.
Any future additional children who enter Residential Accommodation will increase the future projected
overspend.
- (12) Other minor movements.
582

Page 14

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Education Other
Movement :There has been an unfavourable movement of £0.990m compared to P3. This is mainly due to a
projected increase in teacher costs.
3,091 1,362 44%
Employee costs: Additional costs associated with Teachers as a result of Scottish Government's requirement
to maintain the same numbers as in the previous year. Expenditure is influenced by many factors including
Teachers absence where there has been an increase of approx 38% from previous years.
1,121 (201) -18% Income: PPP insurance rebate £0.087m, PPP deductions of £0.093m in excess of budget, £0.017m salaries
received from capital
(5) Other minor movements.
1,156
Note 6 Facilities Management
Movement: There has been a favourable movement of £0.102m compared to P3 mainly due to vacancy
management
13,285 (329) -2% Employee Costs: There is an underspend of £0.329m due to recruitment challenges and a targeted reduction
of overtime and casual costs.
6,403 (639) -10%
Supplies and services: There is a saving of £0.054m in food due to reduced commercial catering and a further
food savings of £0.347m due to reduced school meal uptake.  In addition, there is an underspend within Early
Years of £0.257m which has arisen due to a lower attendance rate than originally anticipated.
3,053 476 16%
Income: There is an under-recovery in commercial catering income of £0.382m due to a reduction in
commercial events and cost/income challenges within commercial venues, and an under-recovery of school
meal income of £0.166m. This is partially offset by an over-recovery of cleaning and janitorial income of
£0.072m.
27 Other minor movements.
(465)
Note 7 Connected Communities
Movement: There has been no change since period 3.
8,052 (148) -2% Employee Costs: Underspends in Community Facilities, Libraries, Country Parks and Community Development
due to vacancy management.
240 60 25% Property Costs: £0.033m overspend in Libraries on Furniture and Fittings and £0.025m overspend in Country
Parks on various property works and removal of trees affected by ash dieback.
1,102 48 4% Supplies and Services: Small overspends across a number of budget lines.
(2,140) 40 Income: £0.080m under recovery in Community Facilities as income has not returned to pre-covid levels and
projected over-recovery of £0.038m in Arran Outdoor Education Centre.
-

Page 15

Appendix 3
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 194              194               -                     0%
Housing and Public Protection
Building Services (2,543)          (2,543)           -                     0% 1         
Property Governance (7)                 (7)                  -                     0%
Planning Services 322              301               (21)                 (7%)
Protective Services 1,736           1,736            -                     0%
Other Housing 2,675           2,537            (138)               (5%) 2         
Total for Housing and Public Protection 2,183           2,024            (159)               (7%)
Commercial Services
Roads 8,504           8,504            -                     0%
Streetscene 5,188           5,188            -                     0%
Waste Resources 9,599           10,261          662                 7% 3         
Total for Commercial Services 23,291         23,953          662                 3%
Economic Development, Growth and
Regeneration
Economic Policy 229              196               (33)                 (14%)
Employability & Skills 1,955           1,955            -                     0%
Regeneration 1,221           1,192            (29)                 (2%)
Business 954              954               -                     0%
Growth & Investment 216              216               -                     0%
Total for Economic Development, Growth and
Regeneration 4,575           4,513            (62)                 (1%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,565           1,586            21                   1% 4         
Housing Assets & Investment (1)                 (1)                  -                     0%
Property Maintenance 3,494           3,519            25                   1%
Property Running Costs 4,664           4,775            111                 2% 5         
Energy and Sustainability 5,172           5,275            103                 2% 6         
Internal Transport 10,171         10,478          307                 3% 7         
Total for Sustainability, Transport and Corporate
Property 25,065         25,632          567                 2%
Net Total 55,308         56,316          1,008              2%

Page 16

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 47,361         47,887          526                 1%
Property Costs 21,394         21,641          247                 1%
Supplies and Services 10,214         10,320          106                 1%
Transport and Plant Costs 7,662           8,364            702                 9%
Administration Costs 793              795               2                     0%
Other Agencies & Bodies 20,643         21,181          538                 3%
Transfer Payments -                   -                    -                     0%
Other Expenditure 182              166               (16)                 (9%)
Capital Financing -                   -                    -                    
Gross Expenditure 108,249       110,354        2,105              2%
Income (52,941)        (54,038)         (1,097)            2%
Net Expenditure 55,308         56,316          1,008              2%

Page 17

Appendix 3a
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since P3 however the service are currently managing significant
financial challenges to achieve a break-even position..
5,345 111 2% Supplies & Services: An overspend of £0.111m in supplies and services. This is due to an overspend in
materials as a result of a change in the volume and  composition of the works programme.
579 142 25% Transport costs: An overspend of £0.142m in transport costs. This is due to an overspend of £0.078m in
scaffolding and £0.064m in skip hire costs.
2,833 569 20% Third Party Payments: An overspend of £0.569m in third party payments is largely in relation to an increase in
the volume of void and damp work.
(21,515) (822) 4% Income: There is a projected over recovery in income of £0.822m largely in relation to the volume and scope of
void works.
-
Note 2 Other Housing
Movement: There has been a favourable movement of £0.085m since P3 which is primarily due to increased
rents arising from demand for Temporary Furnished Accommodation.
3,839 (89) (2%) Employee Costs: projected underspend of £0.089m due to vacancy management.
2,395 20 1% Property Costs: projected overspend primarily due to £0.012m additional costs in property rents and £0.012m
in void rent losses.
(5,862) (78) 1% Income: favourable variance of £0.081m due to demand for Temporary Furnished Accommodation.
9 Other minor movements
(138)
Note 3 Waste Services
Movement: There has been a favourable movement since P3 of £0.416m mostly due to movements in the
recyclates markets.
5,132 756 15%
Employee Costs: The overspend includes temporary additional resources required to deal with new builds and
to cover a significant, and challenging, sickness absence rate. The statutory nature of the service requires
additional resources to cover unforeseen absences. A robust absence monitoring process is in place and an
overall review of the Waste service in light of legislative changes and current service demands is ongoing. This
will also take account of waste compositional analysis.
482 20 4% Supplies & Services: Forecast overspend on Trade effluent £0.023m.
160 223 139%
Transport Costs: Additional vehicles are temporarily in place to deal with pressures from new builds and
seasonal demands in Garden Waste, however a reduction of 3 vehicles has been implemented from 1st
October 2023.
(2,925) (348) 12% Income: Additional income from the renewal of kerbside recyclate contracts of £0.333m.
11 Other minor movements
662
Note 4 Property Management and Investment
Movement : There has been a favourable movement since P3 of £0.053m largely due to a reduction in internal
recharges.
2,582 (29) (1%) Employee Costs: A projected underspend of £0.029m due to vacancy management.
139 (69) (50%) Supplies & Services: Projected underspend due to reduction in internal recharges.
(1,263) 119 (9%) Income: There is a projected under-recovery in fee income of £0.119m.
21
Note 5 Property Running Costs
Movement : There has been a favourable movement since P3 of £0.011m.
6,349 112 2% Property Costs: There is a projected £0.112m overspend due to associated costs for community hubs within
SHUs. Discussions are ongoing regarding potential increased  costs.
(1) Other minor movements
111

Page 18

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 6 Energy and Sustainability
Movement : There has been an adverse movement of £0.029m since P3 due to increased projected utility
costs.
8,262 103 1%
Property Costs: Due to the current energy crisis and after drawing down the maximum available £3.048m from
contingencies and earmarked funds there is a projected overspend in property costs of £0.103m due to
increased utility cost charges.
A number of workstreams are ongoing to reduce consumption to reduce the above tariff related increases and
as part of our overall sustainability strategy.
103
Note 7 Internal Transport
Movement - There has been a favourable movement of £0.013m since P3.  This is mainly due to a projected
underspend in Fuel of £0.017m.
1,796 9 1% Employee Costs: Projected overspend of £0.009m due to lower than anticipated staff turnover.
4,668 169 4% Transport Provision Costs: Projected overspend of £0.168m due to an increase in contractors operating and
running costs which has resulted in higher contract pricing.
1,779 (17) (1%) Fuel: Projected underspend of £0.017m due to lower cost price.
385 76 20% External Hires: Projected overspend of £0.076m which is mainly due to additional hire of vehicles, due to
pending delivery of replacement vehicles.
1,117 70 6% Repairs & Maintenance: Projected overspend of £0.070m in repairs and maintenance which is due to price
increases and maximising the life of assets due to the increased lead time for replacement vehicles.
307

Page 19

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,257 2,251 (6)                 (0%)
SPT Concessionary Fares 286 291 5                  2%
Ayrshire Joint Valuation Board 965 932 (33)               (3%)
3,508 3,474 (34)               (1%)
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
12,377 11,805 (572)             (5%) 1           
Housing Benefits 2,587           2,487           (100)             -4% 2           
20,717 20,011 (706)             (3%)

Page 20

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Other Corporate Items
There has been an adverse movement of £0.249 since Period 3 primarily due to a revised drawdown of
centrally held inflation provision to support pressures within services.
12,377 (572)               -5%
The projected underspend is primarily related to centrally held inflationary cost provisions  which are being
applied to offset pressures reported across other services. The impact of inflation will continue to be monitored
throughout the year.
(572)
Note 2 Housing Benefit
There has been a favourable movement of £0.133m from Period 3 due to the revised Housing Benefit
overpayment recoveries.
2,587 (100)               -4% Projected underspend of £0.100m due to the provision of Housing Benefits and overpayment recovery.
(100)

Page 21

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 12,729 12,729 - -
Contribution to Loans Fund Reserve 4,811 4,811 - -
Scottish Government Funding (347,490) (347,490) - -
Council Tax (65,397) (65,397) - - 1
Use of Earmarked Funds (6,166) (6,166) - -
Net Total (401,513) (401,513) - -
There has been a significant increase in the value of CTR claims received to date, £0.379m. This has been offset
by reduced bad debt provision and the utilisaton of centrally held cost of living provisions.
Note 1 Council Tax

Page 22

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,504 5,209 (295) (5%) 1
Property Costs
Responsive Repairs 7,189 7,173 (16) (0%)
Void Repairs 3,577 4,584 1,007 28%
Planned and Cyclical Maintenance 4,920 4,906 (14) (0%)
Aids and Adaptions 1,617 1,617 - 0%
Other property costs 5,414 5,475 61 1%
Total for Property Costs 22,717 23,755 1,038 5% 2
Supplies & Services 672 656 (16) (2%)
Transport Costs 28 28 - 0%
Administration Costs 1,892 1,908 16 1%
Third Party Payments 3,519 3,519 - 0%
Transfer Payments 172 172 - 0%
Other Expenditure 380 380 - 0%
Capital Financing Costs 23,309 16,182 (7,127) (31%) 3
Gross Expenditure 58,193 51,809 (6,384) (11%)
Income
Council House Rents (56,803) (55,845) 958 (2%)
Other Rents (332) (332) - 0%
Recharges (828) (828) - 0%
Other Income (230) (218) 12 (5%)
Total Income (58,193) (57,223) 970 (2%) 4
Net Expenditure - (5,414) (5,414)

Page 23

Appendix 6a
HRA
BUDGETARY CONTROL 2023/24
REPORT FOR THE 5 MONTHS TO 31 August 2023
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
5,504 (295) -5%
(295)
Note 2
22,717 1,038 5%
1,038
Note 3
23,309 (7,127) -31%
(7,127)
Note 4
(58,193) 970 -2%
970
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/23
£m £m £m £m £m £m
4.709 - - 5.414 (2.648) 7.475
1.500 - - - - 1.500
5.000 - - - (1.417) 3.583
0.198 - - - - 0.198
0.123 - - - - 0.123
0.781 - - - - 0.781
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.270 - - - - 0.270
13.685 - - 5.414 (4.065) 15.034
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works
Section
Employee costs
An underspend in employee costs of £0.295m. This is due to vacancy management.
Movement - there has been a favourable movement of £0.295m since Period 3 due to vacancy management.
Income
Movement - There has been an adverse movement of £0.970m since period 3 as a result of reduced income in
Council House Rents of £0.958m.
There is a projected under recovery of  income of £0.970m. Rental Income is projected to be under recovered by
£0.958m as a result of protracted and Long term voids. 
Property Costs
Movement - there has been an adverse movement of £1.038m since Period 3.
A projected overspend of £1.038m in Property Costs. This is largely due to a projected overspend of £1.007m in
Void Repairs as a result of an increase in the volume and scope of the works. Work is being undertaken to identify
efficiencies and reduce void costs.
HRA reserves and balances
Capital Financing Costs
There is a projected underspend in capital financing costs of £7.127m due to lower than anticipated loan charges. 
This is due to the profiling within the HRA Capital budget and the continued under borrowed position as the council
utilises internal funds in line with the Treasury Management and Investment Strategy. The underspend will be
reflected in the Business Plan which is currently being reviewed.
Movement: There has been a favourable movement of £0.765m since P3 as a result a projected under-borrowed

Page 24

Appendix 7
1) Budget Virements
Place
Roads - Supplies and Services T 0.177
Roads - Third Party Payments T 0.073
Roads - Income T -0.250
0.000
Budget Management - 31 August 2023
Virement/Budget Adjustment Requests
2023/24
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m

Page 25

Appendix 8
Integration Joint Board
12th October 2023
Subject : 2023-24 – Month 4 Financial Performance
Purpose : To provide an overview of the IJB’s financial performance as at
month 4 (July). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected year-
end overspend of £3.859m;
(b) notes the progress with delivery of agreed savings;
(c) notes the actions which are being taken to progress financial
recovery;
(d) notes the remaining financial risks for 2023-24; and
(e) approves the budget reductions which are detailed at
paragraph 2.10. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected expenditure
and income commitments; these have been prepared in conjunction with relevant
budget holders and services.   It should be noted that, although this report refers to

Page 26

the position at the end of July, further work is undertaken following the month end to
finalise projections, therefore the projected outturn position is as current and up to
date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £3.859m (1.2%) for 2023-24.  This
includes the financial impact of the NHS pay award but excludes the Council pay
award. 
1.3  From the core projections, overall, the main areas of pressure are residential
placements for children, supplementary staff in wards and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 4 
At month 4 against the full-year budget of £310.286m there is a projected year-end
overspend of £3.859m (1.2%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £3.507m in social care services and a projected
overspend of £0.352m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £89.932m there is a projected overspend of £0.240m
(0.3%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£0.430m (£0.259m favourable movement). The projected costs reflect the recently
agreed National Care Home Contract (NCHC) rates.

Page 27

The budgeted number of permanent placements is 780 and at month 4 there are
774 placements.  The projection assumes that the current number of placements
will continue to increase to 780 placements by the end of the year. Within the
projection there is an assumption that recent placements which do not have a
completed financial assessment (often due to the pressure to discharge from
hospital) are costed with 50% of the cases at the current average cost of a
placement and 50% at the gross or interim funded rate.  It is likely that there will
still be some cases being gross or interim funded at the year end. Their actual cost
will not be known until the financial assessment is completed and this can impact
on the final position. 
The level of income recovered from charging orders is included in the projection
above and is assumed to be £0.100m over recovered based on the income
received to date.   This income is not easy to project as it depends on the length
of the legal process and time taken to sell the property that the charging order is
registered to. 
b) Care at home (in house and purchased) is projected to be £0.749m underspent
(£0.112m favourable).  The position is made up of an underspend in in-house
services of £1.242m as there are vacant posts, but some of the current capacity is
being met by existing staff working additional hours and casual staff.  Bank staff
are being offered contracts and additional staff are being recruited which will
replace the need for existing staff to work additional hours. This is partly offset by
an overspend in purchased services of £0.493m following a budget reduction
reflecting the transfer of services in-house. 
c) Reablement services are projected to be £0.125m (£0.004m favourable)
underspent due to vacancies. 
d) Care at Home Charging Income is projected to under recover by £0.080m (no
change) due to an ongoing shift towards personal care which is non chargeable. 
e) Physical Disability Care Packages (including residential and direct payments) -
projected underspend of £0.169m (£0.017m favourable) in community care
packages, £0.366m underspend (£0.074m favourable) in direct payments and
£0.565m overspend (£0.046m favourable) for residential placements. There is also
an under-recovery of income of £0.133m (£0.002m favourable).   
f) Anam Cara is projected to overspend by £0.089m (£0.088m favourable) due to
covering vacancies and sickness absence (£0.033m) and under-recovered income
(£0.056m).   The improvement in the projection is following a review of the staff
costs and some costs have been appropriately recoded to other areas of the
service. 
g) Integrated Island Services is projected to be £0.136m overspent (£0.119m adverse
movement). This is mainly due to a projected underspend in care at home costs of
£0.169m (£0.029m adverse movement).  There is also an overspend at Montrose

Page 28

House of £0.157m (adverse movement of £0.061m) which relates to supplies and
cleaning costs and an under-recovery of charging income. The SLA for Scottish
Ambulance service projected to overspend by £0.033m. Arran medical services
are projecting to overspend by £0.045m and the remaining £0.049m projected
overspend is due to supplies costs increasing. There are staffing vacancies which
are included within the payroll turnover savings figures below which offset the use
of agency and bank staff. 
h) District Nursing is projected to overspend by £0.247m (£0.022m adverse
movement) due to an overspend on bank nursing costs and supplies.   
i) Rehab wards are projected to overspend by £0.258m which is an £0.008m
favourable movement (Redburn ward £0.211m overspent and Douglas Grant
£0.047m overspent).  The overspend is due to cover costs for vacancies as well
as supplementary staffing for patients who require one to one support.   
j) Wards 1 and 2 are projected to overspend by £0.750m due to increased use of
supplementary staffing.   
k) Cumbrae Lodge Continuing Care beds are projected to underspend by £0.150m
(no change) due to a reduced charge to reflect the reduction in beds used during
the transition to the new service. 
2.4 Mental Health Services 
Against the full-year budget of £102.479m there is a projected overspend of £1.556m
(1.5%) prior to the reallocation of the Lead Partnership overspend to East and South
HSCP.  This also excludes any potential variance on the Mental Health Recovery and
Renewal Funding where any underspend will be earmarked at the year-end for use in
2024-25. The main variances are: 
a) Learning Disabilities are projected to overspend by £0.695m (£0.004m adverse)
and the main variances are: 
• Care Packages (including residential and direct payments) - projected
underspend of £0.264m in community care packages and projected
overspends of £0.204m in direct payments and £0.579m for residential
placements.   
• Trindlemoss non-employee costs are projected to underspend by £0.075m. 
b) Community Mental Health services are projected to underspend by £0.044m
(£0.159m adverse movement) which is mainly due to an underspend of £0.207m
in community packages (including direct payments) and an overspend in
residential placements of £0.268m.  The adverse movement is due to an increase
in the number of residential placements.

Page 29

c) The Lead Partnership for Mental Health is projecting to be £1.029m overspent
(£0.381m favourable movement) and the main variances are as follows: 
• A projected overspend in Adult Inpatients of £0.667m (£0.067m adverse
movement) due to overspends in supplementary staff, staff in redeployment,
staff cover due to sickness (inc covid outbreak) and reduced bed sale income.  
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.106m (£0.039m adverse movement) based on current number of
placements and enhanced costs remaining until the year end. These
placements are for individuals with very specific needs that require a higher
level of security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women, people
with a learning disability or people with neurodevelopmental disorder. This can
necessitate an UNPACs placement with a specialist provider which can be out-
of-area.  The nature of mental health UNPACs spend is that it is almost
exclusively on medium or long term complex secure residential placements
which are very expensive so a small increase in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions between
units or levels of security can take many months. Applications to approve a
placement are made to the Associate Medical Director for Mental Health who
needs to be satisfied that the placement is appropriate and unavoidable prior
to this being agreed. 
• A projected overspend in MH Pharmacy of £0.024m (£0.094m favourable) due
to an increase in substitute prescribing costs. The favourable movement is due
to a review of the pharmacy cost centres with each now being allocated to
specific wards.
• Learning Disability Services are projected to overspend by £0.419m  (£0.007m
favourable movement) due to high usage of supplementary staffing, a number
of out of area patients being cared for, cross-charging for a LD patient whose
discharge has been delayed and redeployment staffing costs. Supplementary
staffing costs relate to backfill for sickness, increased and sustained enhanced
observations and vacancies.  The enhanced observations are reviewed on a
daily basis.
• Elderly Inpatients are projected to overspend by £0.257m (£0.017m adverse)
due to the use of supplementary staffing.  
• The Innovation Fund is projected to underspend by £0.278m (£0.049m
favourable) due to slippage within some of the projects and not all of the funding
was allocated.
• Addictions in-patients are projected to overspend by £0.045m (£0.105m
favourable) due to the use of supplementary staffing.  The favourable
movement relates to the Scottish Govt funding for 2023/24 being finalised.
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.233m (£0.198m favourable)
in 2023-24, further information is included in the table below:

Page 30

The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• CAMHS £0.592m
• Mental Health Admin £0.358m
• Psychiatry £0.374m
• Psychology £0.683m
• Associate Nurse Director £0.099m 
Vacancy Savings Target (£0.873m)
Projected to March 2024 £2.106m
Over/(Under) Achievement £1.233m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £39.037m there is a projected overspend of £5.600m
(14.3%) (£0.015m favourable) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£5.308m (£0.304m favourable). The main areas within this are noted below: 
• Children’s residential placements are projected to overspend by £5.648m
(£0.320m favourable). We started 2023/24 with 32 external placements and
there are currently 34 placements (month 3 was 36 placements) which are
assumed to continue until the end of the year.  Within the £5.648m there is
£0.145m relating to enhanced costs for two placements.  Despite the number
of placements reducing there has been an increase in the rates where 2:1
support is required and part of these costs were also backdated. There are a
number of factors leading to this challenging position:
• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100%+ occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking Children
(UASC) under the National Transfer Scheme and to support Trafficked
young people located in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements the most cases is
shared 50/50 with Education services.

Page 31

Children’s Services are continuing to work with other services including
Education and Housing to address the challenges. A change programme is
being developed to respond to the pressures of residential care, further detail
of the scope and plan around this work will be presented to a future IJB. 
• Looked after and Accommodated Children (fostering, adoption, kinship etc) is
projected to be £0.411m underspent (£0.050m favourable) based on the
current number of placements. 
b) Children with disabilities – residential placements are projected to overspend
by £0.238m (£0.006m favourable). This is based on 8 current placements and
2 further placements which are expected to commence during September. 
Direct payments are projected to underspend by £0.143m (£0.004m
favourable).  Community packages are projected to underspend by £0.099m
(£0.099m favourable) based on 78 current number of packages and
assumptions around further packages until the year end. 
c) Residential respite – placements are projected to overspend by £0.049m (no
movement).    These short-term placements are used to prevent an admission
to full residential care.  There is one short term placement, but this could vary
throughout the year and have an impact on the projection. 
d) Children’s Houses Employee Costs – are projected to overspend by £0.100m
due to additional overtime costs. 
e) Head of Service – is projected to overspend by £0.321m (£0.016m adverse)
which is mainly due to the saving of £0.233m in relation to the staff
reconfiguration in the children’s houses which is not expected to be fully
achieved in 23-24.  There are also projected costs of £0.092m for the JII (Joint
Investigative Interview) project which is not funded. 
f) Universal Early Years – is projected overspend by £0.130m (£0.027m
favourable) and is mainly due to a projected overspend in care packages of
£0.080m. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line.  All
underspends in employee costs have contributed to the payroll turnover target. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.389m (£0.010m favourable) mainly due to a
projected underspend in the Carers Strategy funding.

Page 32

2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £2.313m
(£0.354m favourable) and the main areas of underspend are: 
• An over-recovery of payroll turnover of £0.723m for social care services and an
over-recovery of payroll turnover of £0.553m for health services as outlined in
the table below.
• The Band 2 to Band 3 regrading costs are still being finalised but there is
£0.700m set aside to cover this as part of the agreed 23/24 budget paper. This
is included as an underspend as the overspends have been included in the
services above. An update on the adequacy of this provision will be provided
in future reports.
• There is projected slippage on the LD and MH transition funding of £0.468m
due to delays in children transitioning into adult services. 
The turnover targets and projected achievement for the financial year for Health and
Social Care services outwith the Lead Partnership is noted below: 
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £1.286m (42.7% of annual target) has been
achieved to date.   
Social Care Health
Services
Vacancy Savings Target (3.014m) (1.433m)
Projected to March 2024 3.737m 1.986m
Over/(Under) Achievement 0.723m 0.553m 
The health vacancy projection to the year-end is based on the month 4 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
The main areas at month 4 are: 
• Children and Families £0.417m
• Learning Disability £0.029m
• Management and Support   £0.120m
• Community Care Service Delivery £0.124m
• Rehab and Reablement £0.115m
• Locality Services £0.144m
• Integrated Island Services £0.167m
• Community Mental Health £0.073m

Page 33

There have been no intentional plans to pause or delay recruitment and services have
actively continued to recruit; in some service areas it has proven difficult to fill posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2023-24 budget included £4.963m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 4
£m
Red - 0.273
Amber 2.245 0.322
Green 2.718 4.368
Blue - -
TOTAL 4.963 4.963 
b) The main area to note is that previous amber savings of £0.273m, relating to
the reconfiguration of staffing within Children and Families, have been
escalated to red.  Progress to date suggests that the timescale for this saving
will not be met and the full £0.273m will not be achieved in 2023-24 but this is
accounted for in the projected outturn.   
Work is ongoing to refresh the Transformation Plan to focus on the financial
challenges which the Partnership expects to face in 2024/25 and 2025/26. The plan
is critical to the ongoing sustainability of service delivery. This will be brought to the
IJB for approval alongside the budget plans for 2024/25. The Transformation Board
also has responsibility for overseeing the delivery of the plan and for ensuring that
projects remain on track. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving.

Page 34

2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis…. without
the express consent of the Integration Joint Board.” 
Appendix C highlights the movement in the budget position following the initial
approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount
1 Budget transfer to pharmacy for 2 X Band 8a post –
Cardiology & Endocrinology
£0.054m
2 Multi-Disciplinary Team funds to Arran Medical
Group
£0.033m
3 Training grade adjustment – reduction in line with
the number of training posts.
£0.035m
4 Transfer budget for 5 hours per week for Band 2
Domestic to ACH Domestics for Ward 3 
£0.004m
5 Transfer of a Band 6 post to Unscheduled Care  £0.061m
6 Transfer budget for additional Band 2 domestic
hours for the Dunure ward per HIS recommendation 
£0.010m
7 Lymphoedema top slice – N/E/S Contributions from
prescribing 
£0.029m   
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB outturn position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis; this position is currently the default pending
further work to develop a framework to report the financial position and risk sharing
across the 3 Partnerships in relation to hosted or lead service arrangements, which
has been delayed by the requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
require to be shared with North. At Month 4 the MH lead partnership is projected to
overspend by £1.029m (£0.337m NRAC share for East and £0.294m for South). 
South HSCP – projected overspend of £0.440m of which £0.163m will be allocated
to North. The overspend is mainly due to an overspend of £0.208m in the community
store, £0.153m in the continence service and £0.078m in the Family Nurse
Partnership.

Page 35

East HSCP – projected underspend of £0.141m of which £0.052m will be allocated to
North. The overspend is mainly due to: 
Primary Care and Out of Hours Services   
There is a projected underspend of £0.189m on the Primary Care Lead Partnership
budget and includes a projected underspend in Dental services totalling £0.267m,
where staffing numbers are running at less than establishment. In addition, there are
projected reduced costs within Primary Care contracting and support £0.343m, largely
due to staff turnover. These reduced costs are partially offset by additional costs in
the GP element of Out of Hours services, as well as additional costs in the overnight
nursing service, totalling £0.469m, as well as a small overspend on projected staff
costs in Primary Medical Services £0.057m. Work is ongoing to address the Out of
Hours increased costs as far as possible over the course of the 2023/24 financial year.
This projected outturn position assumes funding will be allocated to fully offset Urgent
Care Pathway projected costs £1.254m, as well as Covid-19 Therapeutics projected
costs £0.240m 
Prison and Police Healthcare 
The £0.048m projected overspend at month 4 is largely due to increased costs
associated with the new national medical contract. 
Set Aside: - preparatory work is well underway with NHS Ayrshire and Arran and the
other Ayrshire partnerships to progress and develop the set aside arrangements to
fully implement the legislative requirement.  This includes arrangements in relation
to the use of Directions, Joint Commissioning Plans and overall progression towards
fair share allocations of resources. The North budget for set aside resources for
2023-24 is £35.547m.  This is based on the 2023-23 figure of £34.850m inflated by
the 2023-24 uplift of 2%.   
The annual budget for Acute Services is £409.7m.  The directorate is overspent by
£9.5m after 4 months. This is caused by increasing overspends on agency medical
and nursing staff, together with increasing drug expenditure. These have been
required due to the level of operational pressure being experienced, in common with
many other areas in Scotland. Several unfunded wards are open across both main
hospital sites.   
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Numbers of delayed discharges and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance.

Page 36

2.12 FOSTER AND KINSHIP CARER ALLOWANCES 
On 29th August, COSLA and the Scottish Government announced the agreement of a
new standard national allowance for foster and kinship carers across the country. In
the past, each area would set their own allowances but for the first time a national
minimum level has been agreed. This will be supported by £16m of new Scottish
Government funding. It is anticipated that the share for North Ayrshire will be in the
region of £0.475m and this will be confirmed in October.  An initial assessment is that
the funding approximately aligns with the additional estimated cost in North Ayrshire.   
North Ayrshire already pays in excess of the new national rates for all age bandings
except 16+. Where we already pay a higher rate, this will remain unchanged. 
The rates are detailed in the table below: 
Age Banding Existing NA rate New national rate New NA rate
0-4 £200.00 £168.31 £200.00
5-10 £200.00 £195.81 £200.00
11-15 £200.00 £195.81 £200.00
16+ £200.00 £268.41 £268.41 
The new rates will be backdated to 1st April 2023.  Further consideration will be
required re any future year uplifts to the new national minimum rate. 
2.13 FINANCIAL RECOVERY PROGRESS 
The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with
the available resource. 
Heads of Service have closely reviewed expenditure and have implemented actions
which have demonstrated a significant impact on the position, the projected year-end
position has improved by £0.736m since Month 3. The main contributors to this are
noted in the table below: 
Payroll turnover 292,000
Anam Cara staffing 88,000
Care Experienced Young People 304,000
Looked After Children 50,000
Care at Home 112,000
Transitions funding 60,000
MH Lead Partnership (NA share) 147,000 
Work is ongoing to further improve the projected position and an updated plan will
be included in the Month 6 report which will be brought to the November IJB.

Page 37

This ongoing work is built on the following general principles: 
• Minimise impact on delayed discharges or patient flow during Winter
• Exercising professional judgement around the use of waiting lists where this
may have an impact elsewhere in the system
• Reviewing the need for more active management of non-frontline vacant posts
• The non-recurring use of reserves
• Working with East and South on lead partnership projections and impact on
North Ayrshire
• The potential for a freeze on non-essential spend
• Escalating levels of spend authorisation within the HSCP. 
As a contingency there is provision of £2m non-recurring funding set aside in the
reserves (appendix D) to contribute towards the 2023-24 position.   This would
reduce the current projected overspend to £1.859m. 
The IJB also holds a General Fund reserve balance of £6.448m of unallocated funds,
this would underwrite the risk of the remainder of the projected overspend if it cannot
be managed downwards in the coming months.  This would be a last resort as this
funding is non-recurring and it does not resolve the areas underlying the projected
overspend. 
2.14 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2023-24
budget during the year, these include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this.
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The Covid recovery process including the ability to change and improve
services following learning from the Covid response.
• Continuing risks associated with provider sustainability.
• The Local Government pay award is not settled for 2023-24 and negotiations
are ongoing; any increase above the budgeted 3% will impact on the financial
position unless additional funding is forthcoming.

Page 38

These risks will be monitored during 2023-24 and any impact reported through the
financial monitoring report. 
2.15 RESERVES 
The IJB reserves position is summarised in the table below. 
The ‘free’ general fund balance of £6.448m is held as a contingency balance, this
equates to around 2.3% of the initial approved IJB budget for 2023-24 which is within,
but towards the lower end, of the target range of 2%-4%. 
General Fund
Reserves Earmarked Reserves
Total  Debt to
NAC Free GF  External
Funding                      HSCP 
£m £m  £m £m £m
Opening Balance - 1 April 2023 - 6.448  6.997 4.219 17.664
2023-24 Draw Per the Budget
Paper - -  (1.252) - (1.252)
Current Reserve balances - 6.448  5.745 4.219 16.412 
The 2023-24 budget approved the use of £1.252m of previously earmarked reserves
to support a balanced budget position for 2023-24. The HSCP earmarked reserves
also includes a further amount of £2.0m which was agreed to support the financial
position during 2023-24. 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2023-24 from
within the available resource, thereby limiting the financial risk to the funding partners. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2023-
24. 
4. IMPLICATIONS 
4.1 Financial
The financial implications are as outlined in the report.   Against the full-year budget
of £310.286m there is a projected overspend of £3.859m. The report outlines the main
variances for individual services.

Page 39

4.2 Human Resources
The report highlights vacancy or turnover savings achieved to date. Services will
review any staffing establishment plans and recruitment in line with normal practice
when implementing service change and reviews as per agreement with the IJB, there
is no intention to sustain the staffing capacity reduction on a recurring or planned
basis. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
None. 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran Director
of Finance and North Ayrshire Council’s Head of Finance after the report has been
finalised for the IJB. 
Caroline Cameron, Director
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]

Page 40

PUBLIC INFORMATION
2023-24 Budget Monitoring Report–Objective Summary as at 31st July 2023         Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 70,681 69,703 (978) 19,251 20,469 1,218 89,932 90,172 240 616 (376)
: Locality Services 28,207 27,999 (208) 5,332 5,578 246 33,539 33,577 38 306 (268)
: Community Care Service Delivery 36,717 35,938 (779) 0 0 0 36,717 35,938 (779) (728) (51)
: Rehabilitation and Reablement 2,190 2,188 (2) 0 0 0 2,190 2,188 (2) 1 (3)
: Long Term Conditions 944 1,024 80 10,244 11,020 776 11,188 12,044 856 1,029 (173)
: Community Link Workers 197 188 (9) 0 0 0 197 188 (9) (9) 0
: Integrated Island Services 2,426 2,366 (60) 3,675 3,871 196 6,101 6,237 136 17 119
MENTAL HEALTH SERVICES 29,726 30,252 526 72,753 73,783 1,030 102,479 104,035 1,556 1,898 (342)
: Learning Disabilities 22,971 23,665 694 545 546 1 23,516 24,211 695 691 4
: Community Mental Health 5,869 5,825 (44) 1,782 1,782 0 7,651 7,607 (44) (203) 159
: Addictions 886 762 (124) 1,784 1,784 0 2,670 2,546 (124) 0 (124)
: Lead Partnership Mental Health NHS Area Wide 0 0 0 68,642 69,671 1,029 68,642 69,671 1,029 1,410 (381)
CHILDREN & JUSTICE SERVICES 34,484 39,941 5,457 4,553 4,696 143 39,037 44,637 5,600 5,615 (15)
: Irvine, Kilwinning and Three Towns 3,151 2,986 (165) 0 0 0 3,151 2,986 (165) (83) (82)
: Garnock Valley, North Coast and Arran 3,139 3,072 (67) 0 0 0 3,139 3,072 (67) (175) 108
:Intervention Services 1,868 1,883 15 437 438 1 2,305 2,321 16 (84) 100
: Care Experienced Children & Young people 22,618 27,926 5,308 0 0 0 22,618 27,926 5,308 5,628 (320)
: Head of Service - Children & Families 1,071 1,474 403 0 0 0 1,071 1,474 403 305 98
: Justice Services 2,412 2,396 (16) 0 0 0 2,412 2,396 (16) (133) 117
: Universal Early Years 225 204 (21) 3,698 3,840 142 3,923 4,044 121 157 (36)
: Lead Partnership NHS Children's Services 0 0 0 418 418 0 418 418 0 0 0
CHIEF SOCIAL WORK OFFICER 1,852 1,463 (389) 0 0 0 1,852 1,463 (389) (379) (10)
PRIMARY CARE 0 0 0 53,378 53,337 (41) 53,378 53,337 (41) (56) 15
ALLIED HEALTH PROFESSIONALS 0 10,291 10,291 0 10,291 10,291 0 0 0
COVID NHS 0 0 0 0 (274) (274) 0 (274) (274) (275) 1
MANAGEMENT AND SUPPORT COSTS 7,192 6,083 (1,109) 4,787 3,583 (1,204) 11,979 9,666 (2,313) (1,959) (354)
NATIONAL COMMISSIONED SERVICE 0 0 0 3 3 0 3 3 0
FINANCIAL INCLUSION 1,335 1,335 0 0 0 0 1,335 1,335 0 (19)
OUTTURN ON A MANAGED BASIS 145,270 148,777 3,507 165,016 165,888 872 310,286 314,665 4,379 5,441 (1,081)
Return Hosted Over/Underspends East 0 0 0 0 (337) (337) 0 (337) (337) (462) 125
Return Hosted Over/Underspends South 0 0 0 0 (294) (294) 0 (294) (294) (403) 109
Receive Hosted Over/Underspends South 0 0 0 0 163 163 0 163 163 0 163
Receive Hosted Over/Underspends East 0 0 0 0 (52) (52) 0 (52) (52) 0 (52)
OUTTURN ON AN IJB BASIS 145,270 148,777 3,507 165,016 165,368 352 310,286 314,145 3,859 4,576 (736)
Over/
(Under)
Spend
Variance at
Period 3
Movement in
projected 
variance
from Period
3
TOTAL
Partnership Budget - Objective Summary
Council Health
2023/24 Budget

Page 41

PUBLIC INFORMATION 
2023-24 Savings Tracker            Appendix B

Page 42

PUBLIC INFORMATION

Page 43

PUBLIC INFORMATION
2023-24 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     121.408
Less Living Wage Fund not yet
allocated      (2.826)
Revised Budget     118.582
Resource Transfer 1-3 P 23.597
HSCP Fin Circ 3 1-3 T 0.013
Living Wage - final allocation  1-3 P 2.808
ICT Licences Various 1-3 P (0.012)
Island Funds  1-3 T 0.015
Facilities Management Costs -
Montrose House 1-3 P 0.387
West Road - Capital funded from
Revenue  1-3 T (0.300)
Care at Home – Draw from reserves 4 T 0.173
Roundings  T 0.007
Social Care Budget Reported at Month 4 145.270
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Baseline Budget     164.500
Month 10-12 Adjustments     2.473
MDT funding     0.828
Adjust for full year impact of part year
amounts     0.052
Revised Baseline     167.853
Baseline Funding Increase     2.164
Adjust for recurring funding     7.629
Adjust for non-recurring     2.434
Resource Transfer     (23.597)
2023/24 Opening Position     156.483
Net impact of Pan Ayrshire Pressures 1 P 0.028
Top Slicing Posts 2022-23 2   (0.054)
MDT Funds to Arran Medical Group 3   (0.033)
Training Grade Adjustments 3   (0.035)
Ward 3 Band 2 Domestic 3   (0.004)
V2 B6 to AHM233 3   (0.061)
Virement 12 Band 2 Domestic 4   (0.010)

Page 44

PUBLIC INFORMATION
Virement 18 Band 3 budget trf  4   0.019
Lymphoedema Top Slice RX 4   (0.029)
HD Ref 51 Band 2-4 4   0.054
Roundings 4   (0.001)
Anticipated budgets included in the
report but not yet in the ledger 4   8.659
Health Budget Reported at Month 4 165.016    
TOTAL COMBINED BUDGET      310.286