Democracy Spraffa

Agenda Document Pack - Cabinet - 03/10/2023

North Ayrshire Council · 3 October 2023
Back to Cabinet — 3 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet
A Special Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
03 October 2023 at 14:30 to consider the undernoted business.
Meeting Arrangements ­ Hybrid Meetings
This meeting will be held on a predominantly physical basis but with 
provision, by prior notification, for remote attendance by Elected 
Members in accordance with the provisions of the Local Government 
(Scotland) Act 2003.  Where possible, the meeting will be live­streamed 
and available to view at https://north­ayrshire.public­i.tv/core/portal/home
.  
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
EDUCATION ITEMS FOR DECISION
Reports by the Executive Director (Communities and Education)
2 Ayrshire  College  and  Irvine  Royal  Academy  Skills  Centre  of
Excellence
Submit report by the Executive Director (Communities & Education) 
to update Cabinet on the revised position in relation to the Ayrshire 
College Skills Centre of Excellence at Irvine Royal Academy (copy 
enclosed).
3 Education Service Standards and Quality Report 2022­23
Submit report by the Executive Director (Communities and Education) 
to report key progress towards the Education Service Improvement 
Priorities and the National Improvement Framework Priorities for session 
2022­23 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
GENERAL BUSINESS FOR DECISION
Reports by the Director (Health and Social Care Partnership)
4 Chief Social Work Officer Annual Report
Submit report by the Director (Health & Social Care Partnership) to 
provide Cabinet with awareness of the annual Chief Social Work Officer 
report which is required by the Scottish Government (copy enclosed).
Reports by the Executive Director (Place)
5 Lease Disposal – Additional area at Nethermiln Playing Fields, West
Kilbride
Submit report by the Executive Director (Place) to seek Cabinet approval 
to provide a lease of the Football Pitch at Kirkton Glen & Nethermiln 
Playing Fields, West Kilbride to West Kilbride Community Sports Club 
(copy enclosed).
6 North Ayrshire Asset Management Strategy & Plans
Submit report by the Executive Director (Place) to seek Cabinet approval 
of the refreshed North Ayrshire Corporate Asset Strategy and associated 
Asset Management Plans (copy enclosed).
7 Vacant and Derelict Land Strategy 2023­2028
Submit report by the Executive Director (Place) to seek approval for the 
Vacant and Derelict Land Strategy 2023 – 2028 (copy enclosed).
8 Local Transport and Active Travel Strategy 2023­2028
Submit report by the Executive Director (Place) to seek approval for the 
Local Transport and Active Travel Strategy 2023­2028 (copy enclosed).
9 Urgent Items
Any other items which the Chair considers to be urgent.
Webcasting
Please note: this meeting may be filmed/recorded/live­streamed to the
Council's internet site and available to view at https://north­ayrshire.public­
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live­streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
sound recordings and any information pertaining to you contained in them
for  webcasting  or  training  purposes  and  for  the  purpose  of  keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the meeting. 
This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north­ayrshire.gov.uk.
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet Sederunt
Elected Members
Marie Burns (Chair)
Shaun Macaulay (Vice­Chair)
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen
Church Representatives
Mr Andrew Bruce
Ms Elizabeth Turbet
Rev Mark Goodman
Teaching Representative
Ms Jacqui MacKenzie
Youth Council Representatives 
Chair:
Apologies:
Attending:
4

Page 5

NORTH AYRSHIRE COUNCIL 
3 October 2023 
Cabinet 
Title:    Ayrshire College and Irvine Royal Academy Skills Centre
of Excellence 
Purpose:  To update Cabinet on the revised position in relation to the
Ayrshire College Skills Centre of Excellence at Irvine Royal
Academy. 
Recommendation:  That Cabinet: 
a) Notes the revised position in relation to the Ayrshire College   
Skills Centre of Excellence at Irvine Royal Academy; and
b) Welcomes the School-College Partnership developments and 
the Future Skills Hub approach. 
1. Executive Summary 
1.1 In 2014 Cabinet approved a proposal to develop facilities within Irvine Royal Academy
to co-locate a Skills Centre of Excellence supported by Ayrshire College and North
Ayrshire Council.   
1.2   A recent review has resulted in a revised approach to delivery of Developing the
Young Workforce (DYW activity), with a focus on the Future Skills Hub at Kilwinning
Campus. 
2. Background 
2.1 In 2014 Cabinet agreed a proposal to develop facilities within Irvine Royal Academy to
co-locate a Skills Centre of Excellence supported by Ayrshire College and North
Ayrshire Council.  This would provide an opportunity to offer the delivery of a range of
vocational programmes up to and including SCQF level 6 skills in the senior phase of
Curriculum for Excellence. 
2.2 Ayrshire College has three campuses in North Ayrshire. The main campus in
Kilwinning offers a range of further and higher education courses in a number of
subject areas and the Cabinet report included a proposal to deliver sports provision
from Irvine Royal Academy from August 2014. 
2.3 In 2012-13 Irvine Royal Academy had a school roll of 561, considerably short of the
school’s capacity. 
Agenda Item 2
5

Page 6

2.4   The proposal was intended to deliver many of the recommendations from the then
interim report from the Commission on Developing Scotland’s Young Workforce,
which Ayrshire College and its partners welcomed. In particular, considerable drivers
in the College’s work with partners have been focusing efforts on employment
outcomes and supporting local economic development, underpinned by partnerships
with industry. 
2.5    The Irvine Royal Skills Centre of Excellence offered 15 to18 year olds (as well as
young people aged 19-24 and adult returners) the chance to access high quality,
vocational courses relevant to industry needs in an innovative learning environment
providing access to high quality skills training. 
2.6  Analysis by the Ayrshire Economic Partnership and North Ayrshire’s Community
Planning Partnership identified a number of sectors with potential for jobs growth.
These sectors included construction and hospitality and tourism. It was proposed that
the Skills Centre of Excellence would specialise in courses which would support the
industry sectors of construction, hospitality and tourism, and sport and leisure. 
2.7 This investment included co-locating the College within Irvine Royal Academy,
upgrading the existing estate to accommodate the Skills Centre of Excellence and
installing state of the art equipment to deliver industry relevant courses. 
2.8   The proposal relocated current school activity from a wing of the school to allow the
College to occupy a distinct space, sharing sports facilities with the school. 
2.9 The development had the following phases: 
• Phase 1 – September 2014 – Sport/Fitness (including separate changing
accommodation); Health and Social Care (brought forward from Phase 2); and, if
possible, catering for students; and
• Phase 2 – Hospitality, Construction and Engineering by August 2015. 
2.10 The costs of the development were met by Ayrshire College, through access to
funding from the Wood Commission implementation fund, the Scottish Funding
Council and Skills Development Scotland; and by North Ayrshire Council. 
2.11 The College leased the relevant accommodation from the Council. It was agreed that: 
• The lease would be for a period of not less than 10 years from the date of entry for
Phase 1;
• No rent would be payable for the duration of the lease;
• Ayrshire College would require to pay directly, or where appropriate reimburse the
Council all utility charges and statutory charges directly attributable to their
occupation; and
• Ayrshire College would reimburse the Council the due and equitable proportion of
common repairs, maintenance, management and insurance costs attributable to their
occupation, thus helping to defray sunk costs currently absorbed by the Council due
to under occupation of the school estate at Irvine Royal Academy. 
6

Page 7

2.12 Joint partnership working has ensured that students have gained qualifications in
areas such as engineering, carpentry and joinery and hospitality. Students have
progressed to further study at College or directly in to employment. 
2.13 North Ayrshire-Wide School – College Partnership 
The current School-College partnership is a valuable part of the curriculum. The offer
provides high quality senior phase vocational courses from Level 4 and above. They
are intended to support young people prepare for employment and plan progression
pathways onto full-time courses and university. It also builds a network of support for
young people as they move between school and college and university. 
Our School-College Partnership team meet regularly to discuss the attendance and
progress of each pupil to help support young people towards being successful on their
college course. All the partnership work which happens between Education and the
college is a contribution to the Developing the Young Workforce commitments.
Examples of courses offered as part of the partnership are listed below: 
Skills for Work (SfW) 
Skills for Work courses focus on generic employability skills needed for success in the
workplace. The courses offer learners opportunities to learn these skills through a
variety of practical experiences that are linked to vocational areas. 
National Progression Award (NPA) 
NPAs are aimed at developing learners’ knowledge and understanding and, where
appropriate, practical experience of a given area of vocational education. 
National Certificate (NC) 
A National Certificate (NC) is sometimes suitable for students with no formal
qualifications. They offer practical help in developing skills for work and can, in some
instances, provide access to higher level programmes such as a Higher National
Certificate (HNC) or Higher National Diploma (HND). 
Foundation Apprenticeship (FA) 
Foundation Apprenticeships are a work-based learning opportunity for senior-phase
secondary school pupils. Lasting two years, pupils typically begin their Foundation
Apprenticeship in S5. Young people spend time out of school at college or with a local
employer, and complete the Foundation Apprenticeship alongside their other subjects
like National 5s and Highers. 
7

Page 8

HNC (Higher National Certificate) 
HNC courses provide the practical skills and the theoretical knowledge employer will
expect you to have to perform a specific job. All the courses are made up of Higher
National Units and usually take one year to complete. 
In addition to the courses as listed above, ongoing outreach work to strengthen the
partnership continues. For example, Innovation Bursts are offered to pupils in S2 and
S3 to offer samples of vocational courses aligned to Ayrshire Growth Deal priorities. 
2.14 Review of Skills Centre of Excellence 
In 2022, Ayrshire College, with North Ayrshire Council, initiated a review of the Skills
Centre of Excellence approach.  
What has changed since 2014? 
• The recent development of the Regional Skills Strategy, especially the goal of
ensuring that pathways into regional employment opportunities are clearly defined,
and support both new entrants and job changers in the labour market. 
• In recognition of the understanding of emerging skills requirements in preparation for
Ayrshire Growth Deal opportunities and STEM developments locally and nationally,
North Ayrshire Council agreed to contribute £200k to the development of a
Future Skills Hub at Kilwinning College campus from the 2018/19 Council capital
programme. This was in addition to the transfer of land for a nominal £1 during 2021
to support the development of the Hub. 
• The Future Skills Hub is an exciting campus development project for the College
situated on the site of the North Ayrshire Kilwinning Campus. The new Hub replaces
the College’s existing workshop facilities at Nethermains and will enable the College
to offer a dynamic and flexible curriculum aligned to the needs of local and national
skills priorities. The low carbon two-storey building will provide a flexible learning
space that can respond to emerging technologies as the College and partners
upskill the workforce of the future in Engineering, Construction and SMART
Technologies. 
• Ongoing development of the NAC/Ayrshire College Partnership and the Irvine
Royal Academy curriculum since 2014, including a greater range of DYW vocational
opportunities. 
• Enhanced partnership between Ayrshire College and KA Leisure leading to
increased College use of the Portal and other sports facilities to deliver, support and
volunteer within accredited qualifications; 
8

Page 9

• Substantial evidence of disinclination on the part of young people to continue
their education within a school campus environment rather than transitioning to a
Further Education setting. As a result of relocating the courses formerly delivered at
the Irvine Royal Academy campus, no young people will be disadvantaged, and it is
anticipated that the uptake in some courses will increase due to the relocation of the
learning and teaching to a FE facility. 
• An increase in the pupil roll at Irvine Royal Academy from 561 to 762 provides an
opportunity to reconsider the use of the “College” wing, with the potential to create a
health and wellbeing hub in the school campus. 
2.15 As a result of these changes and opportunities, Ayrshire College and North Ayrshire
Council have agreed a discontinuation of the current Skills Centre of Excellence
model at Irvine Royal Academy to facilitate the development of the new Future Skills
Hub and to respond to evidenced student expectations that their post-school learning
takes place in a different setting. 
2.16 North Ayrshire Council’s Estates and Education departments have worked
collaboratively with the College to agree a mutually acceptable early exit strategy from
Irvine Royal Academy. 
2.17 A review is currently underway in relation to the newly vacated space at Irvine Royal
Academy, taking into consideration the increase in the school roll, changing
requirements of the vocational and health and wellbeing curriculum and the needs of
other services. 
2.18 The College and the Council continue to work together to provide the best possible
opportunities for young people in North Ayrshire, through the Local Employability
Partnership, Modern Apprenticeships, Employer Engagement, the Ayrshire Skills
Group, the Ayrshire Growth Deal – Ayrshire Skills Investment Fund, Inward
Investment, Engineering Skills, Employability and Resilience Support through the
Hive, 24/7 Pez and Pez Plus classes as well as for adult learners through Community
Based Adult Learning, including New Scots; Multiply through the Shared Prosperity
Fund and the North Ayrshire Council and Ayrshire College Early Learning and
Childcare Collaborative Working Group. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the revised position in relation to the Ayrshire College Skills Centre of
Excellence at Irvine Royal Academy 
b) Welcomes the School-College Partnership developments and the Future Skills Hub
approach. 
9

Page 10

4. Implications/Socio-economic Duty 
Financial 
4.1 The Council’s Estates department has concluded a mutually satisfactory early exit
agreement with Ayrshire College. North Ayrshire Council will assume running costs for
the whole campus. 
Human Resources 
4.2 None. 
Legal 
4.3 The Council’s Estates department has concluded a mutually satisfactory early exit
agreement with Ayrshire College. 
Equality/Socio-economic 
4.4 The School/College Partnership and DYW has a strategic focus on opportunities for all
young people.   
Climate Change and Carbon 
4.5 The new College facility will be supported by green technologies using air source heat
pumps for the building’s heating systems. 
Key Priorities 
4.6 The following key priorities are relevant to the proposal: 
• Active and strong communities 
• Children and young people experience the best start in life 
• Inclusive, growing and enterprising local economy 
• Residents and communities enjoy life-long health and well-being. 
Community Wealth Building 
4.7 The education and skills agenda provides the basis for the progression of all pillars of
Community Wealth Building. 
5. Consultation 
5.1 Consultation has taken place with young people who are or intend to be students,
Ayrshire College, North Ayrshire Education Service, Irvine Royal Academy, North
Ayrshire Council Estates and Legal departments and Cabinet members. 
Dr Audrey Sutton
Executive Director (Communities & Education)
10

Page 11

For further information please contact Audrey Sutton, Executive Director (Communities
& Education), on (01294) 324414. 
Background Papers
0
11

Page 12

12

Page 13

NORTH AYRSHIRE COUNCIL 
26 September 2023 
Cabinet 
Title:    Education Service Standards and  Quality Report 2022-23 
Purpose:  To report key progress towards the Education Service
Improvement Priorities and the National Improvement
Framework Priorities for session 2022-23. 
Recommendation:  That Cabinet: 
(a) Notes the content of the report; and 
(b) Approves the publication of the report 
1. Executive Summary 
1.1 This report provides information on the performance of the Education Service in the
2022-23 academic year which aligns with the statutory duty for each education authority
to report annually on performance as outlined in the Standards in Scotland’s Schools
etc. Act 2000 and Education (Scotland) Act 2016. 
2. Background 
Education authority statutory duties 
2.1 The Standards in Scotland’s Schools etc. Act 2000 places a statutory duty on education
authorities to annually publish a Standards and Quality report. In addition, there is a
statutory duty outlined in the Education (Scotland) Act 2016, for education authorities to
produce an annual plan and report on progress towards achieving National
Improvement Framework (NIF) priorities. The national priorities in 2022-23 were: 
• Improvement in attainment, particularly in literacy and numeracy;
• Closing the attainment gap between the most and least disadvantaged children and
young people;
• Improvement in skills and sustained, positive school-leaver destinations for all young
people;
• Improvement in children and young people’s health and wellbeing;
• Placing human rights and needs of every child and young person at the centre of
education. 
Agenda Item 3
13

Page 14

Education Service planning arrangements 
2.2 The Education Service Plan priorities for 2022-23 (Education Service Plan - Annual
Improvement Plan (north-ayrshire.gov.uk) are aligned to the NIF priorities, noted in
section 2.1 above. 
2.3 In March 2022, the Scottish Government published a Framework for Recovery and
Accelerating Progress, updated in May 2023. This document requires local authorities
to set stretch aims for improvement, publish them and report on the extent to which
progress towards them is being made in the annual statutory Standards and Quality
Report, beginning in 2023. 
2.4 The Education Service Standards and Quality Report 2022-23, attached at Appendix
1, fulfils the statutory duties and national improvement framework reporting
requirements into a single report. The report describes some of the principal
improvement activities undertaken throughout the academic session 2022-23 and
includes key performance information on learner outcomes. 
3. Proposals 
3.1 It is proposed that Cabinet: 
(a) Notes the content of the report; and
(b) Approves the publication of the report. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 The production of an annual Standards and Quality Report is a requirement under the
standards in Scotland’s Schools Act 2000. In addition, an annual report on progress
towards NIF priorities is a requirement under the Education (Scotland) Act 2016. 
Equality/Socio-economic 
4.4 The Standards and Quality Report sets out our progress towards improving educational
outcomes for all, but also reducing the impact of poverty on educational attainment. 
Climate Change and Carbon 
4.5 The Standards and Quality Report sets out our progress towards improving educational
outcomes including actions taken to promote progressive and interdisciplinary outdoor
learning experiences with a focus on sustainable development goals, directly related to
the NAC Environmental Sustainability and Climate Change Strategy.
14

Page 15

Key Priorities 
4.6 The Standards and Quality Report sets out progress in delivery of the Council Plan
2019-2022 priority to ensure children and young people have the best start in life. In
addition, progress made towards actions outlined in this report continue support the
Council Plan 2023-28 strategic aim to “transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people” and more specifically “improving
educational attainment and achievement and closing the attainment gap” activities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 This report demonstrates progress made towards the Service Improvement Plan
priorities in 2022-23, which reflect the National Improvement Framework priorities for
education 2022-23. Consultation on the content of this report is not required. However,
a range of stakeholders and partners contributed to this report content and continue to
play an active role in enabling the service to realise the NIF priorities and the Council’s
vision to ensure a North Ayrshire that is fair for all by achieving our mission to work
together to improve the lives of our people in North Ayrshire. 
Audrey Sutton
Executive Director (Communities & Education) 
For further information please contact Andrew McClelland, Head of Service (Education),
on (01294) 324413. 
Background Papers
Appendix 1: NAC Education Service Standards & Quality Report 2022-23
15

Page 16

0 
Educa�on Service 
Standards and
Quality Report
2022-23 
Dra� v1  
16

Page 17

1 
Contents
Foreword ................................................................................................................................................. 3
Introduc�on ............................................................................................................................................ 3
The North Ayrshire Local Context ........................................................................................................... 4
Inves�ng in our Learning Environments ................................................................................................. 6
Educa�on Service Improvement Plan Priori�es 2022-23 ....................................................................... 8
Educa�on Service Priority 1 .................................................................................................................. 10
Theme 1: High Quality Learning, Teaching and Assessment ............................................................. 10
Learning, Teaching and Assessment Policy ................................................................................... 10
Play Pedagogy in the early stages of primary ............................................................................... 12
Outdoor Learning / Learning for Sustainability ............................................................................. 12
Digital Learning ............................................................................................................................. 12
Leadership development .............................................................................................................. 13
Theme 2: Raising Atainment and Achievement ............................................................................... 13
Ongoing work to raise atainment including improved tracking and monitoring ......................... 13
Effec�ve Modera�on & Planning .................................................................................................. 14
Performance Indicators for Priority 1 ................................................................................................ 14
Educa�on Service Priority 2 .................................................................................................................. 20
Theme 1: Interven�ons to close gaps ............................................................................................... 20
Strategic Equity Funding Focus ..................................................................................................... 20
Reducing the cost of the school day (COSD) ................................................................................. 20
Theme 2: Specific focus on iden�fied target groups, including care experienced learners ............. 21
Theme 3: Data literacy skills .............................................................................................................. 22
Performance Indicators for Priority 2 ................................................................................................ 22
Educa�on Service Priority 3 .................................................................................................................. 26
Theme 1: Improved Skills .................................................................................................................. 26
Theme 2: Improved Transi�ons ........................................................................................................ 26
Theme 3: Partnerships to improve learner outcomes post-school ................................................... 26
Performance Indicators for Priority 3 ................................................................................................ 27
Educa�on Service Priority 4 .................................................................................................................. 29
Theme 1: Suppor�ng mental health and wellbeing .......................................................................... 29
Counselling supports and community wellbeing supports ........................................................... 29
Whole school approaches to mental health and wellbeing .......................................................... 30
Promo�ng staff wellbeing ............................................................................................................. 31
Theme 2: Suppor�ng social and emo�onal wellbeing ...................................................................... 31
Promo�ng Posi�ve Rela�onships and whole school nurture ....................................................... 31
17

Page 18

2 
Targeted Nurture ........................................................................................................................... 32
Performance Indicators for Priority 4 ................................................................................................ 33
Educa�on Service Priority 5 .................................................................................................................. 34
Theme 1: Suppor�ng needs .............................................................................................................. 34
Suppor�ng needs through renewed systems and processes ........................................................ 34
Suppor�ng needs through enhanced provisions .......................................................................... 34
Suppor�ng needs through professional learning .......................................................................... 35
Theme 2: Maximising learner par�cipa�on and voice...................................................................... 35
Learner Par�cipa�on ..................................................................................................................... 35
Rights Respec�ng Schools (RRS) ................................................................................................... 35
Theme 3: Maximising parent/carer involvement and engagement .................................................. 36
Overview of Pupil Equity Funding ......................................................................................................... 38
PEF Case Studies ................................................................................................................................... 39
PEF Case Study: Glebe Primary School ............................................................................................. 39
PEF Case Study: St Mark’s Primary School ........................................................................................ 39
PEF Case Study: Elderbank Primary School ....................................................................................... 39
Progress towards our single-year Stretch Aims .................................................................................... 41
Progress towards our longer-term stretch aims ................................................................................... 43 
18

Page 19

3 
Foreword
(by Councillor Macaulay, Depute Leader of Council and Cabinet Member for Educa�on and Young
People) 
Introduc�on
(by Andrew McClelland, Head of Service (Educa�on) and Chief Educa�on Officer) 
19

Page 20

4 
The North Ayrshire Local Context
[please update the same graphic as last year with the following figures (show in RED) below:] 
46%
135,280
29% 6,135
20

Page 21

5 
[please update the same graphic as last year with the following figures (show in RED) below:] 
This report details progress made towards our Service Improvement Plan priori�es for session 2022-
23, which are aligned to the Na�onal Improvement Priori�es as follows:
• Improvement in atainment, par�cularly in literacy and numeracy
• Closing the atainment gap between the most and least disadvantaged children and young
people
• Improvement in skills and sustained, posi�ve school-leaver des�na�ons for all young people
• Improvement in children and young people’s health and wellbeing
• Placing human rights and needs of every child and young person at the centre of educa�on  
17,691
1,434
12,700 
support staff hours
establishments
387
14
21

Page 22

6 
Inves�ng in our Learning Environments
Investment in school buildings is of vital importance for several reasons:
• Raising atainment, achievement and wellbeing
• Enhancing quality and reflec�ng changes in curriculum
• Reducing inequality of facili�es and opportunity
Within North Ayrshire we have an excellent record of con�nuous improvement across our Learning
Estate, and Academic Year 2022/23 saw a number of ini�a�ves developed which strengthen that
commitment:
• Moorpark Primary School, Kilbirnie – works commenced on the construc�on of a new 12 class
primary school to replace the exis�ng facility. This is due to open in late 2023 and will provide
high quality and inspira�onal learning environments for the children and young people,
including excellent outdoor learning and sports facili�es.           
• A new primary school at Montgomerie Park, Irvine – Final contracts were signed with HubSW
to deliver a new primary school at Montgomerie Park, Irvine. This completely new facility,
which incorporates funding from the Sco�sh Government LEIP programme, will comprise of
12 primary classes and an Early Years class (2–5-year-olds) and responds directly to the
increasing popula�on, arising from new housing, in that part of the town. Currently, the new
school is expected to open in 2024.       
• Ardrossan Community Campus- Also funded through the LEIP programme, 2022/23 saw
significant progress in developing the design of the new campus at Ardrossan which will
22

Page 23

7 
replace both Ardrossan Academy and Winton Primary School, with a single “Through School”-
only the second in North Ayrshire (a�er Garnock Community Campus). In addi�on, the public
library will relocate to the campus and new public swimming facili�es are also included.
Contracts are set to be awarded for the construc�on of the new facility in summer 2023, with
a construc�on period of around two years star�ng mid 2024.
In addi�on to these single building projects, 2022/23 saw the final projects comple�ng in the
expansion of Early Learning and Childcare facili�es across the Authority. This programme of investment
has seen 41 individual projects delivered, at a cost of £11.8 million, over a 5-year period. 
2022/23 saw works con�nue on the transforma�on of Marress House, a former HMRC building in
Irvine, which will be re-invented as a new Early Years facility and Training space - due to open in in
2023.
North Ayrshire was successful at securing Sco�sh Government funding in rela�on to the proposed
expansion of Universal Free School meals (UFSM) in 2022/23, with a further grant of £1.96 million
being awarded in addi�on to the earlier £738k which was received. Essen�al works to kitchen and/or
dining facili�es at Largs Campus, West Kilbride, Brodick and Corrie Primary Schools were undertaken,
with a further programme of works over the next 5 years planned.  
23

Page 24

8 
Educa�on Service Improvement Plan Priori�es 2022-23
The table below summarises the key pieces of work which have contributed towards our improvement
agenda throughout session 2022-23.
PRIORITY 1: Improvement in atainment, par�cularly in literacy and numeracy
Theme 1: High quality learning, teaching and assessment
Support establishments to implement a revised learning, teaching and assessment policy and review exis�ng literacy
and numeracy frameworks to maximise the quality of learning, teaching and assessment.
Extend play pedagogy from early years into primary 1 and 2, through a pilot programme in iden�fied schools.
Promote progressive and interdisciplinary outdoor learning experiences with a focus on sustainable development
goals, directly related to the NAC Environmental Sustainability and Climate Change Strategy.  
Develop an Educa�on Digital Skills Strategy and support establishments to achieve Digital Schools status, ensuring that
digital technologies are a central component of our approaches to quality learning and teaching. 
Deliver a range of facilitated programmes and bespoke sessions, to support the leadership development and enhance
skills in context of colleagues across all sectors.
Theme 2: Raising atainment and achievement
Develop a 3-year Raising Atainment Strategy to improve outcomes for all learners and reduce inequity of
outcomes, including a focus on accelera�ng progress in early primary and ELC following implementa�on of 1140.
Implement a review of tracking and monitoring procedures in all sectors from early learning to senior phase and
improve the use of progress informa�on to target interven�ons. 
Develop universal professional learning supports on effec�ve modera�on and planning for learning, teaching and
assessment. 
PRIORITY 2: Closing the atainment gap between the most and least disadvantaged children
and young people
Theme 1: Interven�ons to reduce gaps
Repriori�se our targeted interven�ons to reduce the poverty-related atainment gap in North Ayrshire, maximising the coherence
and impact of our work.  
Con�nue to work collabora�vely in partnership across the local authority, SWEIC and na�onal networks to support sharing of
highly effec�ve prac�ce that reduces the poverty related atainment gap.    
Work closely across North Ayrshire services and third sector partners to reduce the cost of the school day and mi�gate the impact
of child poverty.
Theme 2: Interven�ons to reduce gaps
Develop an improving outcomes strategy (and ac�on plan) for iden�fied target groups, including care experienced learners.  
Further enhance supports for care experienced children and young people, including mentoring services, that enable them to
atain and achieve in line with their peers.
Theme 3: Data literacy skills
Further develop data literacy skills in our staff to strengthen self-evalua�on and planning for improvement and maximise the
effec�veness of targeted interven�ons. 
PRIORITY 3: Improvement in skills and sustained, posi�ve school-leaver des�na�ons for all
young people
Theme 1: Improved skills
Promote the further embedding of appropriate wider achievement op�ons in the senior phase.
Theme 2: Improved transi�ons
24

Page 25

9 
Review the use of tracking and transi�on informa�on to plan learning experiences around key transi�on points.
Through DYW co-ordinators and other partners, embed approaches to planning, suppor�ng and tracking post-school des�na�ons
for all school leavers.
Review approaches to implemen�ng the Career Educa�on Standard through strengthened partnership working with Skills
Development Scotland.
Theme 3: Partnerships to improve learner outcomes post-school
Refresh and strengthen the focus of the school-college partnership and to provide enhanced opportuni�es for achievement, e.g.
through the Regional Improvement Collabora�ve, in the senior phase. 
Design tailored programmes with partners to provide enhanced support for specific groups of school leavers, including those with
iden�fied needs. 
PRIORITY 4: Improvement in children and young people’s health and wellbeing
Theme 1: Suppor�ng mental health and wellbeing
Review the impact of school counselling services and external counselling / community wellbeing supports and refresh provision,
strengthening the rela�onship between school counselling and other available supports.  
Assist educa�on establishments to implement the na�onal mental health and wellbeing Whole School Approach, including
curricular, professional learning and parental supports.
Promote staff mental health and wellbeing in a range of ways, including through a new programme of supported reflec�ve prac�ce
sessions.   
Theme 2: Suppor�ng social and emo�onal wellbeing
Review approaches to promo�ng posi�ve rela�onships and whole school nurture, based on an analysis of need. 
Support a range of targeted nurturing approaches, including nurture groups that con�nue to develop the social and emo�onal
skills of iden�fied children and young people.
Use our analysis of health & wellbeing data from a range of sources, including the na�onal census, to develop targeted
improvement priori�es for curricular delivery, universal approaches in establishments, and wider community supports.
PRIORITY 5: Placing human rights and needs of every child and young person at the centre of
educa�on
Theme 1: Suppor�ng needs
Review and redesign processes and policies which apply to all learners (2-18) to ensure they are equitable, consistent, lean,
coordinated, co-designed with relevant partners, and learner centred.  
Establish an enhanced range of flexible and child centred learning provisions, curriculum and delivery methods to meet a wide
variety of support needs.
Provide tailored professional learning opportuni�es for all staff groups within establishments to support the needs of children and
young people.  
Theme 2: Maximising learner par�cipa�on and voice
Co-create with children and young people new, systema�c mechanisms, which maximise learner par�cipa�on and voice, through
a a new Learner Par�cipa�on Policy.
Undertake a review of Service wide policies to ensure UNCRC principles are considered 
Theme 3: Maximising parents/carer involvement and engagement
Implement locally the revised ‘Learning Together’ Sco�sh Government parental involvement and engagement ac�on plan. 
Provide enhanced guidance for schools and Parent Councils to support and guide greater involvement in the opera�onal ac�vi�es
of the school. 
Through the Family Learning Team and establishments, offer a wide range of opportuni�es that enhance family learning in
establishments. 
25

Page 26

10 
Educa�on Service Priority 1
Improvement in attainment, particularly literacy and numeracy
Theme 1: High Quality Learning, Teaching and Assessment 
Learning, Teaching and Assessment Policy
The Learning, Teaching and Assessment policy was launched in October. This policy promotes best
prac�ce and will be used to build upon consistency in teaching and learning across our schools.
Our Professional Learning Academy has provided training and interven�ons for our schools with
par�cular focus on numeracy and literacy. Examples of interven�ons and training we have provided
below.
Interven�on Numb
er of
Staff
Numbe
r of
Pupils
Impact of Interven�on
Literacy: 
Aten�on & Listening
A whole school interven�on to develop
aten�on and listening skills through the
levels.
63 337 Staff par�cipants felt the interven�on promoted professional
dialogue across stages, in addi�on to the interven�on having
a meaningful impact and providing opportuni�es to share
exis�ng good prac�ce. The impact of this interven�on
resulted in pupil progress and approaches which could be
implemented within the classroom.
Literacy: 
Boos�ng Reading @ S5/6 
10-week interven�on suppor�ng the
acquisi�on of good reading skills. Training
with S5 & S6 Pupils working with S1 & S2
pupils who have a reading age 18-24
months below their chronological age
N/A 65 Pupil confidence grew in suppor�ng younger pupils and
recognising the strategies that would enable them to do this,
98% of pupils rated their confidence as high/very high in
terms of suppor�ng a younger reader a�er the training.  
Literacy:
Boos�ng Reading @ Primary/Secondary 
10-week interven�on suppor�ng the
acquisi�on of good reading skills. Training
with Classroom Assistants working with
P3-S2 pupils who have a reading age 18-
24 months below their chronological age
11 13 Pupil reading age increased by an average of 30 months over
the 10 week interven�on. 
Schools found that the interven�on had a significant posi�ve
impact on the children involved in terms of fluency,
comprehension and confidence.
Literacy: 
Classroom Assistant’s Suppor�ng
Phonological Awareness
Classroom Assistant led interven�on with
small groups to 
develop phonological awareness skills at
Early, First and Second 
Level
11 38 Findings from post interven�on screeners show
improvement in most areas of the Phonological Awareness
(PA) con�nuum in all pupils, with significant improvement in
most of the areas targeted.
CAs increased understanding of phonological awareness was
a key impact of this interven�on.
26

Page 27

11 
Literacy:
Note Making
8-week interven�on teaching learners
the skill of note taking
using the Cornell method in order to
enhance their wri�ng across the
curriculum
4 115 100% of pupils were able to successfully use the Cornell
notes format. No pupils could do this pre-interven�on. Post-
Interven�on feedback highlighted the sustainability of the
interven�on with those who took part, expressing that they
will con�nue the Cornell note making method across all
areas to help pupils build confidence with their notes. 
Literacy:
Oracy Across the Curriculum
A whole school approach designed to
teach learners to 
ar�culate ideas, develop understanding
and engage with others through spoken
language
60 700
(Avg.) 
Par�cipants felt that it broke down the skills children needed
and was a valuable input. Some par�cipants even suggested
it should be mandatory training for all schools across North
Ayrshire to ensure shared language across the authority.
Literacy:
Talk Boost 2 
Training provided by PLA staff to CAs and
CTs to support children in Primary 4-7
with their language 
and communica�on skills
10 N/A The session offered opportuni�es to learn about how to
iden�fy pupils with speech and language difficul�es.
All (100%) of par�cipants either strongly agree or agree that
the session increased their knowledge
Literacy:
Talk Boost 1
Training provided by PLA staff to CAs and
CTs to support children in Primary 1-3
with their language 
and communica�on skills
24 N/A Some par�cipants felt that the session offered good
examples of how to track children involved and underpinned
the theory of speech and language communica�on needs.
Numeracy:
Classroom Assistants Suppor�ng
Numeracy 
A targeted small group interven�on for
P3 pupils who are “not on track” in
numeracy whilst upskilling CAs in
suppor�ng numeracy development  
15 71 This interven�on led to Classroom Assistants discovering
novel resources and ideas to keep pupils on track and
interested in learning.
Almost All CA’s commented that they could see clear
progress with pupils, who were now also more confident in
comparison to pre-interven�on and sta�ng pupils could now
answer numeracy problems verbally.
Numeracy:
Making Maths Tac�le 
A whole class interven�on promo�ng
effec�ve use of manipula�ves and visuals
to develop a deeper understanding of
numeracy and maths
10 200
(Avg.)
Post-Interven�on qualita�ve statements highlighted that
due to this interven�on par�cipants felt more confident and
comfortable using manipula�ves across a wide range of
concepts. All par�cipants commented on the effect and
sustainability of the interven�on due to improved
confidence and development of pupil's numeracy skills due
to this interven�on. Pupils now shared their thinking through
both writen and verbal communica�on. 
The local authority has a holis�c approach to assessment and modera�on, involving schools, clusters,
and the authority level. Senior leaders par�cipate in regional and na�onal modera�on groups. The
learning, teaching, and assessment policy guides staff in planning forma�ve and summa�ve
assessments. Na�onal Standardised Assessments are used in the modera�on process to iden�fy
learning gaps. Professional dialogue promotes con�nuous improvement, and the authority plans to
27

Page 28

12 
provide online standardized assessments to support schools in addressing poverty-related atainment
gaps.
Play Pedagogy in the early stages of primary
16 schools from across North Ayrshire par�cipated in our P1 Play Pedagogy pilot this session. 
The staff professional learning programme consisted of 7 training sessions with a mix of networking
visits and drop-in sessions to provide further support, as well as a support surgery session with
colleagues from Educa�on Scotland, Educa�on Psychology, Early Years and NAC Play Pedagogy
Development Team. Each session included �me for prac��oners to network with others in different
schools and reflec�on �me to allow staff to plan with their colleagues while at the session, using the
development team for support if needed. 
Impact was measured using both Leuven scale data and case studies. Each case study had a different
focus. This resulted in a wide range of data showing impact on pupil engagement and wellbeing as well
as development of curricular areas through play pedagogy. Case studies can be found on our PLA
Pedagogy website.
The combina�on of training, networking, case studies and collabora�ve working has resulted in
posi�ve impact across all 16 schools involved. All schools have now embedded playful approaches
across P1 and are looking to move forward with the same approach in P2 and beyond. Sustainability
has been built into the programme as schools were encouraged to take a whole school approach,
involving management teams and staff at all stages. 
Outdoor Learning / Learning for Sustainability
An early years outdoor science resource was developed, led by our STEM team. The purpose of this was to link
outdoor learning experiences to Science experiences and outcomes and Sustainable Development Goals.
Professional learning sessions for this resource were atended by 215 NAC prac��oners. Evalua�ons were
completed by prac��oners following the training, 100% of whom agreed that using the resource has helped
them to make links between outdoor learning and science experiences and outcomes, and that this would
improve and extend the quality of outdoor learning experiences.
Over 100 staff atended further professional learning on outdoor learning and learning for sustainability for
primary-aged children. In addi�on, whole-school training sessions have been delivered in three schools and the
STEM team has supported a further three schools through outdoor learning team teaching inputs.
School gardening training sessions were delivered by Ardrossan Academy staff to 10 primary schools. A school
gardening handbook has been created collabora�vely, with advice, guidance and good prac�ce, and this has
been shared with all schools. Finally, six of our schools schools par�cipated in a successful partnership with Go
Wild Scotland, to provide nature experiences for learners, linked to the curriculum. 
Digital Learning
14 schools have achieved their Digital Schools award with almost all North Ayrshire schools registered
and on the way to achieving this award. Many schools are also working towards the Digital Wellbeing
award, demonstra�ng a strategic approach to cyber resilience and internet safety. Senior school
leaders from across the authority engaged in a professional learning programme en�tled ‘Evolving
Digital Thinking’, suppor�ng this journey. An established network of Digital Coordinators con�nued to
meet termly to develop digital skills and cascade these within their school contexts. Pupil Digital
28

Page 29

13 
Coordinators have met twice, learning new skills and networking with other schools, with plans to
build on this further next session. 
Leadership development
Throughout 2022-23 the leadership team con�nued to grow the facilita�on model to develop skills in
context in line with school improvement plans and the educa�on service improvement priori�es.  The
number of leadership facilitated sessions has increased from the previous year.  This year 36
establishments have been supported in the sustainable delivery of facilitated learning.  
In addi�on, our “leadership for and of learning” programme con�nued to grow and offered learning
opportuni�es for colleagues at all levels.  For example, the new Head Teacher Induc�on programme
was developed responsively and collabora�vely with those 14 colleagues who engaged.  The Depute
Head Ac�on Learning Set for primary and secondary colleagues enabled good prac�ce and
collabora�ve learning to take place.  The leadership for learning programme provided class teachers
with the opportunity to reflect on their own leadership styles and to take ownership of their own
leadership trajectory.  
Our successful partnership with the SWEIC has been based on our con�nued strategic role in delivering
the leadership programmes.  The Leadership of Pedagogues (Secondary Middle Leaders) is successfully
established and this year’s cohorts all achieved GTCS professional recogni�on.  Based on the success
of this programme and in recogni�on of primary colleague demand a Leadership of Pedagogues
(Primary Middle Leaders) was piloted and will con�nue next academic session. 
Theme 2: Raising Atainment and Achievement 
Ongoing work to raise atainment including improved tracking and monitoring
We provided addi�onal class teachers for some of our primary schools. These schools were chosen
using our atainment data from session 2021-2022. Head Teachers and staff iden�fied pupils who
would benefit from well-planned interven�ons which were focused on Numeracy, Literacy and Health
& Wellbeing ul�mately raising atainment. 
Schools set targets for their iden�fied pupils and carefully tracked the progress of the interven�ons
and the impact on their young people. Data was gathered through a variety of formal and informal
assessments. All schools report a posi�ve impact and improved atainment.
Work con�nues to develop data literacy throughout the educa�on service with the provision of an
enhanced range of data tools, as well as training and support, which enables effec�ve data driven
decision making within schools. For example, with support from our Data Team and input from our
Educa�on Scotland Atainment Advisor, two collabora�ve improvement sessions for HTs were held this
year to develop use of tracking and monitoring to enhance data led interven�ons. Furthermore, all
Early Years establishments took part in Self Evalua�on for Con�nuous Improvement Programme where
the focus was on using data to track and monitor progress.  This work, combined with refreshed
approaches to teaching, learning and modera�on, is suppor�ng schools in closing the atainment gap
and raising atainment for all our young people.
29

Page 30

14 
Effec�ve Modera�on & Planning
We have made significant progress in implemen�ng a holis�c approach to assessment and modera�on.
Our modera�on steering group led all schools in their priori�sa�on of modera�on in improvement
plans, and final feedback shows that there is now a stronger focus on professional dialogue,
collabora�on, and use of more consistent planning formats. Pupil voice is valued, and there is a clear
emphasis on understanding the process of assessment. Use of the modera�on cycle has brought about
posi�ve changes, including improved staff confidence, clearer progression, and increased engagement
among pupils. There is greater shared focus and collabora�ve planning amongst staff teams, with an
emphasis on high-quality assessments and benchmarking. Par�cipants have appreciated the
opportuni�es for sharing prac�ces and collabora�ve planning, both within and beyond their schools.
There is now a desire for more training, guidance, and examples of high quality assessments,
networking opportuni�es with Early Years se�ngs, and improving the gathering and presenta�on of
assessment data. School modera�on leads report a strong belief in the value of the modera�on cycle
and its impact on consistency, progression, and improved outcomes for all pupils and discussions
highlight a commitment to con�nuous improvement and a focus on narrowing the poverty-related
atainment gap.   
Performance Indicators for Priority 1 
NAC Early Years Developmental Milestones
The percentage of pre-school children achieving their development milestones by the �me they start
primary school has once again increased to 81% in 2022-23 academic year. This is the best performance
recorded since the measure was introduced, with improvements made in all aspects of the early years
milestone including literacy, numeracy and health and wellbeing. 
30

Page 31

15 
Achievement of Curriculum for Excellence Levels
In 2016, the Sco�sh Government began to collect sta�s�cs on the Curriculum for Excellence level
achieved in Literacy (Listening and Talking, Reading, Wri�ng) and Numeracy by pupils in the Broad
eneral Educa�on (BGE) stages P1, P4, P7 and S3. This is based on teacher judgement about each pupil’s
achievement of expected level made at the end of June each session. This data collec�on by the
Sco�sh Government was suspended in 2020 for all schools due to the impact of the pandemic. Data
collec�on was resumed in 2021 for stages P1, P4 and P7 though not S3. In 2022 all stages were once
again collected. There is a strong improvement trend in all measures at almost all stages for the 2016-
2019 period. There was a significant decrease across all measures between 2019 & 2021. 
The latest published achievement figures are for 2022. These demonstrate the significant steps taken
towards recovery. Combined Numeracy achievement for P1, P4 & P7 is 76%, an increase of 9
percentage points on the previous year. Similarly, combined Literacy achievement for P1,P4 & P7 is
67%, an increase of 8 percentage points on the previous year. It is evident that the addi�onal
interven�ons in literacy and numeracy, have had a significant impact in con�nuing recovery from the
pandemic. Early indica�ons are that this improvement has con�nued throughout session 2022-23,
with publica�on of the 2023 achievement levels expected in December 2023. 
77% 77% 78%
72%
79%
81%
88% 87%
89%
86%
89%
91%
72%
75% 76%
69%
76%
79%
83%
74% 74%
68%
74%
77%
60%
65%
70%
75%
80%
85%
90%
95%
2017 2018 2019 2021 2022 2023
% of pre-school pupils reaching their developmental milestones by Primary 1
Overall Developmental Milestones Health and Wellbeing Milestones
Literacy Milestones Numeracy Milestones
31

Page 32

16 
Improving leavers’ attainment in literacy and numeracy
Performance of North Ayrshire school leavers in ataining Literacy at Level 4 and Level 5 displays a
posi�ve 5-year picture. Our schools remain above or in line with the Virtual Comparator, the SWEIC
authori�es and the Na�onal performance in all 5 years of this analysis. In 2022, North Ayrshire school
leavers have outperformed all other comparators at both level 4 and level 5, with 95% achieving
literacy at level 4 or beter and 84% achieving literacy at level 5 or beter.
The performance of North Ayrshire school leavers in ataining Numeracy at Level 4 and Level 5 also
displays a posi�ve 5-year trend with both figures above the Virtual Comparator. For Level 4, 91% of
leavers achieved this which is the second highest figure in the 5-year trend. Similarly for Level 5, 71%
of leavers achieved this which is also the second highest figure in the 5-year trend.
32

Page 33

17 
Improving attainment for all
This measure focuses on the average total tariff score of the candidate’s latest and best qualifica�ons.
Tariff points are assigned to each unit or course achieved by learners – in all SCQF-graded awards, not
only those provided by SQA. This acknowledges to a greater extent the drive towards wider
achievement qualifica�ons and encourages schools to offer curricular choices tailored to a variety of
pupil abili�es and aspira�ons. In 2022, the average total tariff score for the lowest ataining 20% of
learners is above the Virtual Comparator, and although slightly lower than 2021, it is above the 2019
and 2020 performance. The average total tariff score of the middle ataining 60% of leavers is the
second highest on record in the 5-year trend. Though slightly below the Virtual Comparator, a posi�ve
5-year trend is evident, par�cularly in the years since the change of curriculum structure in S4. The
average total tariff score of the highest ataining 20% of leavers is the highest on record in the 5-year
trend. The figure is above the Virtual Comparator and a consistent 5-year posi�ve trend is evident. 
School Leavers Average total tariff points in North Ayrshire 
(compared to Virtual Comparator and Scotland): 
2017-18 2018-19 2019-20 2020-21 2021-22 
NAC VC Scot NAC VC Scot NAC VC Scot NAC VC Scot NAC VC Scot
Lowest
20% 170 141 164 145 119 151 140 129 151 161 162 165 156 141 156
Middle
60% 815 795 858 697 734 821 782 835 889 845 898 956 819 821 887
Highest
20% 1785 1786 1851 1665 1746 1829 1797 1875 1930 1862 1933 1998 1914 1895 1968 
33

Page 34

18 
The average complementary tariff scores are calculated using the same principles but display the
average tariff score for only the five best qualifica�ons achieved per candidate. Further informa�on
about tariff points can be found here. 
School Leavers Average complementary tariff points in North Ayrshire 
(compared to Virtual Comparator and Scotland): 
2017-18 2018-19 2019-20 2020-21 2021-22 
NAC VC Scot NAC VC Scot NAC VC Scot NAC VC Scot NAC VC Scot
Lowest
20% 150 124 143 134 109 134 126 114 133 141 140 144 137 126 138
Middle
60% 611 604 646 556 563 623 611 618 657 643 654 692 607 601 644
Highest
20% 1229 1227 1281 1189 1200 1267 1255 1268 1313 1254 1286 1339 1256 1252 1303 
Breadth and Depth
Breadth and depth measures highlight that North Ayrshire’s school leaver atainment performance is
broadly in line with both the SWEIC and na�onal performance. In 2022, the performance of North
Ayrshire pupils was above the SWEIC performance in every category below for the first �me.
A higher percentage of school leavers le� school in North Ayrshire in 2022 with at least one Level 6
qualifica�on (Higher) than across the SWEIC or na�onally.
Atainment has been steadily increasing at Level 7 over the last six years. 
5 or more at Level 3        
2017 2018 2019 2020 2021 2022
Na�onal 90.8% 90.1% 89.0% 89.6% 90.5% 90.1%
North Ayrshire 91.9% 91.3% 89.4% 89.8% 91.0% 91.2%
SWEIC 92.0% 91.4% 89.8% 89.9% 90.8% 90.5%       
5 or more at Level 4        
2017 2018 2019 2020 2021 2022
Na�onal 87.4% 86.7% 85.4% 85.8% 87.1% 86.5%
North Ayrshire 88.0% 86.7% 83.6% 84.3% 85.8% 86.5%
SWEIC 88.6% 87.9% 85.4% 85.4% 87.0% 86.3%       
5 or more at Level 5        
2017 2018 2019 2020 2021 2022
Na�onal 62.2% 64.4% 64.3% 67.5% 70.5% 67.7%
North Ayrshire 60.5% 63.2% 60.7% 65.3% 69.6% 67.0%
SWEIC 63.0% 64.1% 63.5% 66.4% 69.0% 66.3%       
1 or more at Level 6      
34

Page 35

19 
2017 2018 2019 2020 2021 2022
Na�onal 64.8% 66.2% 66.2% 68.2% 70.2% 67.1%
North Ayrshire 62.2% 65.4% 65.0% 67.3% 70.6% 68.0%
SWEIC 64.1% 65.0% 64.0% 65.8% 68.6% 65.1%       
3 or more at Level 6        
2017 2018 2019 2020 2021 2022
Na�onal 48.9% 50.3% 50.9% 54.7% 56.6% 53.0%
North Ayrshire 44.9% 46.7% 44.4% 51.7% 53.8% 51.0%
SWEIC 47.4% 47.0% 47.5% 51.9% 53.9% 50.7%       
5 or more at Level 6        
2017 2018 2019 2020 2021 2022
Na�onal 34.5% 35.5% 36.0% 40.2% 42.1% 38.7%
North Ayrshire 31.5% 30.9% 28.3% 35.6% 37.6% 36.1%
SWEIC 33.7% 32.0% 32.7% 36.3% 38.5% 35.9%       
1 or more at Level 7        
2017 2018 2019 2020 2021 2022
Na�onal 22.0% 23.2% 22.1% 25.6% 28.0% 26.0%
North Ayrshire 19.4% 19.9% 18.0% 23.5% 23.9% 24.7%
SWEIC 20.8% 20.6% 20.0% 23.5% 24.9% 24.5%  
35

Page 36

20 
Educa�on Service Priority 2
Closing the attainment gap between the most and least disadvantaged children and
young people
Theme 1: Interven�ons to close gaps 
Strategic Equity Funding Focus
Despite a £1.1m reduc�on in Strategic Equity Funding, which is provided to local authori�es as part of
the Sco�sh Atainment Challenge, North Ayrshire has con�nued to make good progress in closing the
poverty related atainment gap following the Covid-19 pandemic. This year a considerable focus has
included steps to ensure sustainability of impac�ul interven�ons within the context of funding
reducing by £4.4m over a 4-year period. This has included the development of a revised Professional
Learning Academy delivery model, which aligns more closely with the need for targeted and bespoke
support in establishments that is driven by improvement planning. In addi�on, work is underway to
further embed whole school nurture across establishments with further integra�on of pupil support
and targeted nurture resources to best meet the needs of learners. 
Reducing the cost of the school day (COSD)
The Educa�on service iden�fied reducing the cost of the school day (COSD) as an area of focus for
schools. It is recognised that educa�on can support children to find a route out of poverty, but crucially
only if children and young people can access educa�on as fully and equally as possible. An ac�on plan
for reducing the cost of the school day has been used to build upon the priori�es iden�fied by North
Ayrshire’s Child Poverty Board.
The Educa�on Service, in partnership with the Youth Par�cipa�on team has made very good progress
towards reducing the COSD for children and young people. Learner Par�cipa�on has played a key role
within the council’s Child Poverty strategy and ac�on plan and as part of our commitment to ensuring
children and young people are at the centre of our efforts to reduce the COSD, we also held our second
COSD conference in May 2023. We brought together over 170 pupils from across North Ayrshire
Primary and Secondary Schools for a full day of ac�vi�es led by Educa�on staff and the Youth Services
team. 
As a result of priori�sing reducing the barriers associated with Child Poverty and reducing the COSD,
there is greater shared focus and collabora�ve planning amongst staff with all educa�onal
establishments having been encouraged to use the COSD toolkit and those schools using this approach
have seen posi�ve changes, including the following:
• Uniform recycling and new school uniform policies implemented to reduce costs
• Support towards transport to and from school and external trips and visits
• Food ini�a�ves e.g. breakfast clubs, holiday lunch provision, healthy snacks
• Extra-curricular ac�vi�es and a�er school Clubs
• Support and fundraising for equipment and trips 
• Digital support
• Period dignity products
• Suppor�ng children beyond the school day 
36

Page 37

21 
Pupils and staff have shared good prac�ce across schools, Early Years Establishments and throughout
the community via school and early years networks, youth par�cipa�on and locality planning
networks.  There is now a stronger commitment to con�nuous improvement and a focus on reducing
the cost of the school day and the barriers experienced for children and families and poverty. 
Theme 2: Specific focus on iden�fied target groups, including care experienced
learners
Care experienced children and young people con�nue to be supported through a range of
interven�ons where the focus is on delivering equity and improving educa�onal outcomes. 
MCR Pathways: North Ayrshire’s Young Talent programme
The MCR Pathways Young Talent programme supports our young people in, or on the edges of care
within 6 of our secondary schools. In the last academic year 229 young people were supported through
the programme:
S1 S2 S3 S4 S5 S6 Total
55 47 68 27 23 9 229 
Of this number, all 102 S1 and S2 pupils par�cipated in weekly group work throughout the academic
year. The focus of this group work was on building self-esteem and confidence, strengths and interests,
teamwork, problem solving and employability skills. A further 50 young people were directly
supported by one of our MCR Pathways Co-ordinators, who are members of the school’s extended
pastoral support team. They provide an enhanced and integrated level of support, liaising with
partners. A large number of this group are preparing to be supported by 1:1 mentors.
A key part of the MCR Pathways programme is the use of mentors from across our communi�es in
North Ayrshire. Our mentors come from local businesses, the public sector and the third sector. They
have a wealth of experiences and life skills. They all share the same desire to support a young person
in their local community and give something back. Our mentors are trained and supported throughout
each stage of their mentoring rela�onship with their young person. This year, 77 young people were
supported in weekly face-to-face sessions by a mentor, with plans to extend this figure in the near
future.
The impact of the MCR programme is evident in: improved literacy and numeracy outcomes for this
group; improvements in the number and level of qualifica�ons achieved and 100% of this year’s leavers
group supported by this programme entering a posi�ve des�na�on. 
Home tuition
An addi�onal tutor has been employed to provide one-to-one tui�on for care experienced children
and young people. The tutor has joined our Home Tui�on Service and supports our learners by:
• Providing one to one intensive individual support. This may happen outside of normal lessons
as addi�onal teaching, for example, as part of extending school �me or as a replacement for
other lessons.
• Suppor�ng with specific classwork or homework which involves the teacher/tutor suppor�ng
tasks given to pupils by their teachers to be completed outside of usual lessons and/or ‘flipped
learning’ models, where learners are supported to prepare for classroom discussion and
applica�on tasks. This could take place in school outside normal school hours, and/ or in the
children’s houses.
37

Page 38

22 
Theme 3: Data literacy skills
Posi�ve steps have been taken in progressing data literacy development across the educa�on service
through professional learning opportuni�es for school leadership teams, with support provided by
educa�on’s data team, senior managers, and Educa�on Scotland colleagues. This has promoted a ‘data
driven dialogue’ model that can be applied to a range of locally developed Microso� Power BI reports
to analyse pupil data to inform school improvement. Bespoke data analysis tools to interrogate and
analyse data include achievement of Curriculum for Excellence levels; pupil atendance and exclusions;
SQA results; and a new Power BI report which will use progress and achievement data to support
school improvement in the 2023-24 academic year.
A data literacy self-evalua�on framework is also in development for implementa�on in the 2023-24
academic year. This will be u�lised by school leadership teams to self-iden�fy areas where addi�onal
data literacy support would be beneficial as part of the school’s improvement journey. 
Performance Indicators for Priority 2
Primary attainment gap (P1, P4, P7 combined Curriculum for Excellence Levels)
Primary literacy and numeracy atainment gaps within Broad General Educa�on (BGE) have started to
reduce again following the covid-19 pandemic. Although these atainment gaps con�nue to be greater
than pre-pandemic levels, recent data suggests further reduc�ons will occur in part due to targeted
interven�ons across educa�on establishments. 
38

Page 39

23 
School Leavers Attainment Gap (Breadth and Depth)
In the 2022-23 academic year, the atainment gap between the most and least disadvantaged school
leavers achieving at least 1 qualifica�on at SCQF Level 5 has reduced over the last three years. The
percentage point gap between learners living in the 20% most deprived areas of North Ayrshire
compared to all other learners is 10.9 percentage points in the most recently published data. The
atainment gap in percentage points of school leavers living in 20% most deprived areas (Quin�le 1)
ataining at least 1 qualifica�on at level 6, is lower in the most recent year than before the pandemic.
It must be noted however that Alterna�ve Cer�fica�on models have been in place from 2020-2022 so
cau�on is advised when interpre�ng this dataset. 
-9.1% -13.1% -12.7%
-11.2% -10.9%
70%
75%
80%
85%
90%
95%
100%
2017/18 2018/19 2019/20 2020/21 2021/22
Percentage point attainment gap in school leaver achievement of at
least one award at level 5 
SIMD Quintile 1 achieving at least 1 at level 5
SIMD Quintiles 2-5 achieving at least 1 at level 5
39

Page 40

24 
School Leavers Attainment Gap (Average Total Tariff Score)
Average total tariff score is a measure of the pupil’s latest and best awarded qualifica�ons. Tariff points
are assigned to each unit or course achieved by learners – in all SCQF-graded awards, not only those
provided by SQA. This acknowledges to a greater extent the drive towards wider achievement
qualifica�ons and encourages schools to offer curricular choices  tailored to a variety of pupil abili�es
and aspira�ons. 
The atainment gap in average total tariff score between school leavers living in North Ayrshire’s 20%
most deprived areas and pupils living in all other SIMD deciles has reduced considerably over a five-
year period by 6 percentage points. Over the last two years, our performance has stabilised below the
corresponding na�onal figure. Again, cau�on should be taken in interpre�ng this data owing to the
specific circumstances and Alterna�ve Cer�fica�on models in place since 2020. 
-21.45% -23.29% -21.21% -17.93% -20.82%
40%
45%
50%
55%
60%
65%
70%
75%
80%
85%
2017/18 2018/19 2019/20 2020/21 2021/22
Percentage point attainment gap in school leaver achievement of at least
one award at level 6 
SIMD Quintile 1 achieving at least 1 at level 6
SIMD Quintiles 2-5 achieving at least 1 at level 6
44%
37%
41%
44%
38% 38%
43%
43%
41%
42%
40% 41%
30%
32%
34%
36%
38%
40%
42%
44%
46%
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
Percentage gap between Average Total Tariff Score of School Leavers from the 20 % most
SIMD deprived areas and that of those from the 80% least SIMD deprived areas
% GAP  20/80 - North Ayrshire % GAP  20/80 - National
40

Page 41

25 
Care Experienced Leavers educational outcomes
In North Ayrshire we count all children and young people as “care experienced” if they are currently
looked a�er at home, away from home or if they have ever been looked a�er at any point in the past.
Care experienced leavers in North Ayrshire are con�nuing a posi�ve 5-year trend of atainment in the
number of Level 4 and Level 5 qualifica�ons achieved. In 2022, 87% of North Ayrshire’s care
experienced leavers atained at least 1 qualifica�on at SCQF Level 4 or beter, the highest performance
in the 5-year trend. For Level 5, 62% of care experienced leavers achieved at least 1 qualifica�on which
is in line with highest performance in the 5-year trend. The na�onal report on Educa�onal Outcomes
for Looked A�er Children does not publish atainment data for all care experienced learners, focusing
instead on those who were “looked a�er” in that year. In the charts below, North Ayrshire’s Care
Experienced outcomes as well as North Ayrshire’s Looked A�er outcomes are displayed, in order to be
able to benchmark the data against the available na�onal level sta�s�cs. 
41

Page 42

26 
Educa�on Service Priority 3
Improvement in skills and sustained, positive school leaver destinations for all young
people 
Theme 1: Improved Skills
Schools across North Ayrshire con�nue to diversify their curriculum to grow and develop the skills of
our young people. In addi�on to SQA Na�onal Qualifica�ons, over 60 addi�onal courses across a wide
range are offered such as Beekeeping, Digital Media, First Aid and Film & Media Studies. All secondary
schools are either on the journey towards or have already achieved SCQF Ambassador School status,
promo�ng atainment and achievement in a vast range of skills. Ayrshire College has con�nued to work
with secondary schools to develop skills mapping from Senior Phase courses into College Pathways.
Furthermore, in partnership with Ayrshire Chamber of Commerce, work experience opportuni�es
have also been successfully reintroduced, thereby strengthening access to workplace skills and
qualifica�ons. 
Theme 2: Improved Transi�ons
The above work informs post-school transi�ons which are supported by a wide network in schools and
external partners. For example, each secondary school has a Developing Young Workforce (DYW)
Coordinator who promotes opportuni�es and pathways designed to ensure young people have the
opportunity to develop skills responsive to future economic changes. 
Schools have increased their use of the SEEMIS 16plus Tab which has enabled earlier iden�fica�on of
specific groups of school leavers through the Skills Development Scotland (SDS) Data Hub. This data is
used by them and other partners for early interven�on and support in advance of an�cipated school
leaving date. For example, in partnership with SDS and North Ayrshire’s Local Employability Partnership
(LEP), 169 young people were iden�fied to take part in an offer delivered by employability training
partners CEIS (Community Enterprise in Scotland). Young people took part in workshops focusing on
confidence, skills & quali�es, workplace health & safety and money management. 
As part of the Local Employability Partnership, an evening was held targe�ng young people across
North Ayrshire considering next steps beyond school. The Your Next Move event was atended by over
600 young people and families with over 40 local employers and Ayrshire College represented.
Supplementary events were also held on Arran and a uniquely adapted Reverse Job Fair for Lockhart
Campus to ensure universal access for all leavers. 
Theme 3: Partnerships to improve learner outcomes post-school
The School-College partnership with Ayrshire College con�nues to form a valuable part of the
curriculum. The offer provides high quality senior phase voca�onal courses from Level 4 and above
and con�nues to support young people to prepare for employment and Further or Higher Educa�on.
It also builds a network of support for young people as they move between school and college or
university and plan progression pathways onto full-�me courses. Our School-College Partnership team
meet regularly to discuss the atendance and progress of each pupil to ensure all possible step success
on their college course. 
42

Page 43

27 
Educa�on works in partnership with North Ayrshire Employability Service to offer individualised
support. This feeds into a programmes, partners and referrals process which offers various pathways
for vulnerable leavers and supported by partner agencies. For example, Barnardos are employed for
targeted and outreach work with young people, including care experienced, facing significant
challenges in accessing a posi�ve des�na�on. 
Performance Indicators for Priority 3 
School Leavers entering an initial positive destination
An ini�al posi�ve des�na�on means that a school leaver has gone on to one of the following ac�vi�es
immediately a�er leaving school: further or higher educa�on, training, skills development or
employment. At 96%, the propor�on of leavers in North Ayrshire moving into an ini�al posi�ve
des�na�on is the highest on record, above the Virtual Comparator and Na�onal performance. To
maximise the percentage of school leavers entering and sustaining posi�ve des�na�ons, schools
con�nue to work hard in strong partnership with Skills Development Scotland. 
The Annual Participation Measure for all 16-19 year-olds
The Annual Par�cipa�on Measure (APM) is a measurement of the propor�on of 16-19 year olds
par�cipa�ng in educa�on, training or employment over a whole year (1st April-31st March). The
indicator provides a measure of the status of the wider aged 16-19 cohort – not just those who have
le� school. The Annual Par�cipa�on Measure, covering the year from April 2022 – March 2023 showed
95.6
94.0
92.5
95.2
96.0
93.2
94.0
92.3
95.1 94.9
94.4
95.1
93.4
95.5 95.7
90
91
92
93
94
95
96
97
98
2017/18 2018/19 2019/20 2020/21 2021/22
%
Year
Percentage of School Leavers moving into Positive
Destinations
North Ayrshire Virtual Comparator National
43

Page 44

28 
that of the 5,872 16-19 year olds in North Ayrshire, 93.9% were in educa�on, employment or training
and personal development. This is the highest on record since the APM started in 2016.
[INSERT GRAPH – ANNUAL PARTICIPATION MEASURE 2023] 
44

Page 45

29 
Educa�on Service Priority 4
Improvement in children and young people’s health and wellbeing 
Theme 1: Suppor�ng mental health and wellbeing 
Counselling supports and community wellbeing supports
A full counselling review has been undertaken this session and has involved consulta�on with
stakeholders including children and young people, school staff and counsellors.  
A literature review of effec�ve prac�ce was also undertaken. This review has been used to shape the
future model of primary school counselling and update the well-established secondary school
counselling service, which has been in place since the start of the Atainment Challenge.  Whilst it has
been necessary to change the primary school counselling offer, we are confident that the links with
wider mental health and wellbeing (MHWB) supports that have been established as part of this review
will ensure that there will be support available for this age group. 
In terms of how the counselling service has supported staff prac�ce within our schools, the impacts
can be summarised in three main categories:
• School staff are able to support individual pupils beter (through for example being more
familiar with appropriate support strategies and language).
• School staff have greater awareness and knowledge (of themes such as trauma and its impact).
• School staff have strengthened posi�ve rela�onships (with for example other professionals
working together to support a young person, as well as strengthened links with the home).
Some impact data on how counselling services have supported a wide range of children and young
people across North Ayrshire are included at the end of this sec�on.
The Educa�on Service is the lead partner in the delivery of the Children and Young People’s Community
Mental Health and Wellbeing Supports and Services Framework. Children, Young People and Families
have access to a range of supports and services within their communi�es to support emo�onal distress
and to promote posi�ve mental health and wellbeing. Data gathering and consulta�on with the
community has been central to the development of services. Key highlights include the employment
of a Welfare Rights Officer (WRO) to engage directly with families following referral from educa�on
staff. Over the course of the 2022-23 school year, this has resulted in financial gains of over £572,000
for families who need it most. The link between financial insecurity and poor mental health is well
documented and the posi�ve impacts of our approach in North Ayrshire are increasingly evident.
“Just wanted to say thanks again. After coming off the phone to you I felt like I could see a light. I have
so much to work through regarding my mental health so having these options of unfit to work and the
Scottish pip gives me that time without the pressure.”
(Feedback from a Parent/Carer following ini�al mee�ng with WRO) 
71 children, young people and families have benefited from co-produced bespoke supports which have
had a posi�ve impact on mental wellbeing. Examples of referral reasons for support include:
45

Page 46

30 
• family rela�onships / home issues
• poverty / homelessness
• trauma
with many children and young people experiencing mul�ple barriers to posi�ve wellbeing. 
“Personally, as a parent / observer I can see the big difference in the way they self- regulate if a situation
becomes challenging and they feel triggered ….”
(Feedback from a mum whose child has neurodiversity and iden�fies as non-binary) 
A review of the Kilwinning and Largs Wellness Models has taken place. The Educa�on Service in
partnership with NHS Ayrshire and Arran Public Health along with mul�-agency partners have used
this review as the basis for developing a refreshed and expanded approach to suppor�ng children and
young people’s wellbeing across the whole authority, with the revised Wellness Model being rolled
out to addi�onal locali�es. Our review highlighted the importance and benefits of all agencies working
together to have a posi�ve impact on mental health and wellbeing in our communi�es. 
Whole school approaches to mental health and wellbeing
This session we have con�nued our focus on ensuring children, young people and families have access
to the right supports at the right �me in our schools and communi�es. One cluster has piloted the
Whole School Approaches to MHWB self-evalua�on tool, and this has shaped the further
enhancement of supports within establishments.
Educa�on staff have had access to an extensive range of professional learning opportuni�es with an
addi�onal 200 members of staff engaging with our Children and Young People’s Mental Health and
Wellbeing Professional Learning Resource this session. In addi�on, we now have 93 members of staff
across a range of schools who are trained to deliver Let’s Introduce Anxiety Management (LIAM). To
broaden the reach of this approach, we have this year developed a “LIAM at home” project which
targets children and young people whose engagement with educa�on is impacted by anxiety. This new
project is showing early signs of success. Across the authority, 33 children and young people have
completed the wider LIAM programme this year with an addi�onal 8 engaging with group work.
Posi�ve impacts have included: young people who can now cope with being in crowded spaces; a
reduc�on in exam stress; and an increase in the number of young people who are now able to come
to school without feeling anxious. In addi�on we have delivered Suicide Preven�on Training, with 15
addi�onal staff trained in Applied Suicide Interven�on Skills (ASIST),  54 members of staff trained in
Assessing Suicide Risk in Kids (ASK) and 29 in safeTALK – Suicide Awareness training. All S6 pupils in
our Secondary Schools have been offered Suicide Awareness Training (safeTALK) with over 100 young
people taking part in training during June, feedback from young people indicates they feel more
confident to have conversa�ons around wellbeing with their peers.
Our partnership with See Me See Change con�nues to develop with NAC Educa�on Service
contribu�ng to the further enhancement of the na�onal an�-discrimina�on and s�gma youth
programme. 200 senior pupils took part in training in June 2023 in prepara�on for next session. This
session, the See Me Ambassadors delivered assemblies, PSE lessons, supported mental health and
wellbeing sessions in Primary schools and held bakes sales to raise awareness of mental health.
46

Page 47

31 
The Mentors in Violence Preven�on (MVP) programme is now embedded in our secondary
establishments. MVP network representa�ves from each
school meet termly to share ideas, update on progress and
share good prac�ce, some of which has been used na�onally
as an example of good prac�ce. 
Capacity building for staff has con�nued in 2023 with bespoke
North Ayrshire training delivered by our newly upskilled team
of in-house MVP trainers. We have partnered with staff from
Ac�ve schools, KA Leisure, and Youth services to broaden the
reach of this preventa�ve programme further into our
communi�es. 
We have invested in the recruitment of 12 addi�onal Area Inclusion Workers who, along with the
original team have undertaken extensive professional learning around suppor�ng children and families
with their mental wellbeing. They have a key role in maximising school atendance, providing support
and guidance to families and delivering Health and Wellbeing Sessions to children. Most pupils who
have engaged with one of our Area Inclusion Workers have shown an improvement in their mental
health and wellbeing and school atendance. Further evalua�on is con�nuing to support the
iden�fica�on of the most impac�ul interven�ons.
Educa�on Staff all have access to an ever-expanding range of resources to support and promote
posi�ve mental health and wellbeing through a dedicated glow blog (staff website). There have been
over 7,000 engagements with the support materials by our staff in the academic session 2022-23. 
Promo�ng staff wellbeing
We used research and the ac�on research paper developed to inform a staff development session,
which helped to demonstrate areas of strength and areas of development. 
One of the significant messages noted was the impact of workload and bureaucracy on wellbeing, staff
highlighted the value of being listened to and involved in decision making and this has informed how
we have worked with staff across the service this session. Wider feedback was shared with all staff and
included areas of focus for both establishments and the authority. We have engaged with a number of
schools and centres to explore a prac��oner enquiry approach to staff wellbeing, which will be taken
forward in session 2023-24 and beyond. 
Theme 2: Suppor�ng social and emo�onal wellbeing 
Promo�ng Posi�ve Rela�onships and whole school nurture
During Session 2022-23 we have undertaken a range of ac�vi�es to support our Promo�ng Posi�ve
Rela�onships approach in North Ayrshire.  This has included work on Building on Posi�ve Rela�onships
(based on the Non Violent Resistance approach) for both schools and parent workshops.  We have run
three parent workshops over the session with parents repor�ng a significant improvement in the
behaviour of their children following the workshops.  Using the widely available and respected
Strengths and Difficul�es Ques�onnaire as a basis for measuring impact, the mean scores for children’s
total difficul�es significantly reduced following the 10-week parent group.  We have also run
47

Page 48

32 
workshops for our primary and secondary schools as well as our Area inclusion workers and further
developed our Building on Posi�ve Rela�onships plans in line with this.  
A key part of our work this session has been a review of our whole school nurture approach to ensure
that nurture principles are embedded within the whole school system at the same �me as building
capacity towards a consistent, authority-wide approach to whole-school nurture. This review has
included surveys with stakeholders including:
• 832 staff who responded to our main review ques�onnaire
• 32 children and young people in focus groups across 4 primary and 2 secondary schools
• 11 Educa�onal Psychologists, 15 Head Teachers and 141  teacher and classroom assistant
responses to addi�onal ques�onnaires.  
• We also explored our current approaches and held a stakeholder event to look at next steps. 
Some of the feedback from this work is detailed below: 
Following the review, work has commenced on upda�ng the professional learning programme
suppor�ng this work, developing a whole school nurture benchmarking framework to support school
self-evalua�on and planning for improvement in this area and the establishment of a Service
Improvement Group to take this work forward into session 2023-24 and beyond.
Targeted Nurture            
There are currently 22 Primary Nurture Groups and 9 Secondary Nurture Groups,
with 4 further primary PEF funded groups opera�ng a range of tailor-made nurture
models with target groups, supported by the authority-wide Principal Teacher of
Nurture. Clear guidelines have been produced and shared with each sector,
alongside a quality assurance framework and weekly professional learning
sessions. 
A summary of impact of nurture interven�ons is included in the table below: 
Posi�ve outcomes of targeted nurture approaches
48

Page 49

33 
Children and young people in primary and secondary se�ngs who have received nurture support
are showing gains in social and emo�onal progress and are con�nuing to access mainstream
educa�on.
Children and young people who have received nurture support are ataining and achieving more
closely in line with peers over �me.
Educa�on establishments can demonstrate an increased understanding and applica�on of whole
school nurturing approaches. This will increase establishment understanding and awareness of the
interdependencies between effec�ve nurture and mental health and wellbeing support.  
Of the 832 staff who responded to our nurture survey, 78% felt confident applying what they have
learned about nurturing approaches in prac�ce.
St Mathew’s Academy were awarded the pres�gious Marjory Boxall Nurture Quality Mark Award
in 2023 in recogni�on of their support of Children and Young people. They also became North
Ayrshire’s first secondary schools to achieve the Rights Respec�ng Schools Gold Award, in no small
part due to their commitment to Nurture.
A longitudinal study is currently in prepara�on tracing the views and development of those pupils
who atended nurture previously, with publica�on expected in session 2023-24. 
Performance Indicators for Priority 4
School Counselling
In the most recent data collec�on (covering the period from January to June 2023 which included 447
children accessing school counsellors), North Ayrshire had 294 hours of school counselling being
provided per week, with 99% of children and young people repor�ng an improved outcome following
access to a counsellor. 
The highest frequency reasons for presen�ng to a counsellor were: anxiety, depression or low mood,
emo�onal or behavioural difficul�es, family problems, stress, self-worth, academic issues, trauma.  
Community mental health and wellbeing supports and services
Across the whole academic year 2022-23, a total of 6,038 children and young people accessed
community health and wellbeing supports and services. Overall, out of the 5,237 people who accessed
posi�ve mental health and wellbeing services, 72% had measurable improved outcomes at the �me
of this report being writen. 
Pupil attendance data
Atendance has declined across North Ayrshire schools since the onset of the COVID pandemic and
has not yet recovered. This general trend also appears to be reflected in na�onal sta�s�cs. As a
result, the Educa�on Service has incorporated this theme into the next Service Improvement Plan for
2023-24. 
86
88
90
92
94
2018-19 2019-20 2020-21 2021-22 2022-23
NAC Total Pupil Attendance (%)
49

Page 50

34 
Educa�on Service Priority 5
Placing human rights and needs of every child and young person at the centre of
education 
Theme 1: Suppor�ng needs 
Suppor�ng needs through renewed systems and processes
Following a collabora�ve review of the processes involved in suppor�ng needs, specific areas were
targeted for redesign. We sought to iden�fy and retain the effec�ve, well-established elements whilst
refining and co-designing others. Our Staged Interven�on policy for iden�fying and planning for
children and young people with addi�onal needs was redesigned and simplified. This focuses on three
elements of support: Enhanced Universal, Stage 1 and Stage 2. The policy includes detailed descriptors
around each element which clarify the level of need and how these can be best supported. Streamlined
approaches to short, medium and long term planning are in place along with clear guidance on how
mee�ngs with young people and their families are recorded to ensure we fully comply with legisla�on. 
Processes for accessing supports such as the Outreach Support Service (Extended Outreach and Tui�on
Support), Early Years Inclusion Support Service (EYIST) and Accessibility Strategy have been
streamlined to enable a service which is learner centred with clear routes to referral. Accessing these
services can be �me-cri�cal and so the referral pathways have  been separated from the exis�ng
Inclusion Group to speed up this process and reduce the number of cases being considered at this
forum.
At all stages, collabora�on and co-crea�on have been crucial with evalua�on ongoing. Leaders from
all sectors and at all levels have been involved with the evalua�ons demonstra�ng the effec�veness of
the approach in ensuring all voices are heard, policies are co-designed and there is a clear sense of
joint ownership across the Service.
Suppor�ng needs through enhanced provisions
Following successful pilot projects running in Greenwood Academy and Irvine Royal Academy in 2021-
22, Secondary Support Resources were established in all 9 secondary schools. The approach to the
design was developed in line with the na�onal ‘Guidance on the Presump�on to Provide Educa�on in
a Mainstream Se�ng’ published in March 2019. We were also guided by the 2017 Suppor�ng
Children’s Learning Code of Prac�ce and the Standards in Scotland’s Schools etc. Act (2000). 
This enhanced support resource is available to learners across all secondary schools and offers an
environment which supports personalised learning for young people who have a range of support
needs and require ongoing enhanced transi�on. This is not specialist provision, instead is a way of
offering targeted support to those who require it to support their mainstream experience.
A network of senior leaders was established to co-create and develop guidance and ensure there were
consistent pillars of prac�ce, whilst enabling schools to tailor their provision to match the needs of
their current cohort of learners. Learners were iden�fied by cluster primaries as well as through the
Inclusion Group. Data and impact reports were compiled and showed that, in this first full year, over
300 learners were supported to atend their mainstream secondary provision. Data demonstrates that
there were significant impacts in the areas of atendance, engagement, mo�va�on and posi�ve
a�tudes to school and self. 
50

Page 51

35 
Links with educa�onal psychologists and the mental health and wellbeing team have ensure that staff
are well-trained and feel confident in the impact they are making on the lives of the young people they
support. Evalua�ons from your people and their families demonstrate the high regard in which the
support is held.
Suppor�ng needs through professional learning
The needs of young people have grown in complexity and it has been impera�ve for us to review and
enhance our already significant range of professional learning available to staff teams. Ini�al
evalua�ons demonstrated the excep�onal range of professional learning available locally, na�onally
and interna�onally. Therefore, the focus was on cura�ng and signpos�ng this learning for leaders,
teachers and support staff. 
A professional learning �le was created on GLOW which covers all aspects of suppor�ng needs. This is
divided into a range of themes, which were decided upon based on data around the needs most
prevalent within our establishments. Topics such as suppor�ng neurodiverse learners, trauma
informed prac�ce, SCERTS and Building Posi�ve Rela�onships are signposted and include professional
reading, staff workshops and useful links. There are also links to our partner organisa�ons who have
played a key role in suppor�ng our establishments and learners over the course of the session.  
This site is complemented by the NACEDinform site which contains all relevant policies, paperwork
and referral pathways. 
Theme 2: Maximising learner par�cipa�on and voice 
Learner Par�cipa�on
Research published by Scotland’s Commissioner for Children and Young People “How Young People’s
Par�cipa�on in School Supports Atainment and Achievement”  highlights a strong correla�on
between schools ’approaches to learner par�cipa�on and levels of achievement and atainment.
Having reviewed the na�onal context, the Educa�on service priori�sed the placing of human rights
and needs of every child and young person at the centre of all educa�onal establishments. 
A new Learner Par�cipa�on Strategy has been introduced involving schools and early years se�ngs,
clusters and local authority officers. Staff have par�cipated in collabora�ve sessions to ensure that the
new strategy is “fit for purpose”. The learner par�cipa�on strategy will be further developed in session
23-24 through the co-crea�on and co-design of a pupil-friendly version with learners. The strategy and
follow up ac�on plan will be monitored and reviewed by the Service Improvement Group responsible
for Learner Par�cipa�on. 
Rights Respec�ng Schools (RRS)
Considerable progress has been made over the last three years across the Rights Respec�ng Schools
programme (RRS).  This programme has been promoted and introduced into almost all of our schools.
The Rights Respec�ng Schools Award recognises achievement in pu�ng the United Na�ons
Conven�on on the Rights of the Child (UNCRC) at the heart of a school’s planning, policies, prac�ce
and ethos. Children’s rights underpin the Ge�ng it Right for Every Child approach. 
Over 90% of our schools have achieved or are working towards RRS status, which is divided into
bronze, silver and gold levels. 
51

Page 52

36 
RRS Gold Award is the highest level of the award and is granted to schools that have fully embedded
the principles of the UNCRC into their ethos and curriculum. The accredita�on is valid for a period of
three years.
The following North Ayrshire schools have achieved Gold status:
Ardeer Primary School; Beith Primary School; Dykesmains Primary School; Glencairn Primary School;
Stanley Primary School; St Bridget’s Primary School; St Luke’s Primary School; St Mary’s Primary School;
St Mathew’s Academy; Whitehirst Park Primary School,
The remainder of schools engaging with RRS awards are at Bronze level, working towards silver or
working to maintain their Silver status.
Rights educa�on and the Rights Respec�ng Schools approach remain areas of success and strength. 
The RRS approach is evident in all schools with success being shared through their social media
pla�orms and via atrac�ve school and classroom displays. Focus groups of children reveal that they
are knowledgeable about their own and others’ rights. Increasingly children and young people are
taking on elements of responsibility and par�cipa�on ensuring that all schools listen and involve pupils
fully in decisions that affect them and their school community. A focus on inclusion and equality by
our schools and centres ensures increasing opportuni�es are provided for those with protected
characteris�cs. 
Theme 3: Maximising parent/carer involvement and engagement 
Developing a range of ini�a�ves, interven�ons, and programmes to increase opportuni�es to enhance
family engagement in learning con�nues to be the focus of our Family Learning Team. The Team has
worked closely with schools and families to devise and develop family learning opportuni�es which
meet the needs of parents and families. 
This session a total of 2,566 families engaged in Family Learning opportuni�es offered in school and
within the local community. Throughout this year Family Learning opportuni�es were delivered across
39 primary schools and 6 secondary schools. 
The programmes delivered by the Family Learning Team can be split into four key areas – Curriculum,
Transi�on, Health & Wellbeing, and Learning Opportuni�es for Parents/Carers. Through individual
school requests the team has delivered 19 different interven�ons during 2022 – 23. 
Programme  Family Par�cipa�on 
Read Write Count Gi�ing to P2 & P3 510 
Family STEM (Including Young STEM Leader) 343
Outdoor Learning (Including John Muir Award)  263
Transi�on (Into P1 and P7 – S1)  183
Family Literacy  171
Family Food & Fitness  170  
The outcome of all interven�ons delivered by the Family Learning Team are evaluated through seeking
family feedback and ongoing monitoring throughout the year to ensure the needs of families are being
52

Page 53

37 
met. Evalua�ons con�nue to provide evidence of impact, par�cularly under the following wellbeing
indicators:
• Safe - Family gains more knowledge and understanding of how to reduce their child/young
person's risk of harm online.
• Healthy – Parents/Carers know how their child/young person can lead a healthy lifestyle and
know how to support their child’s development and emo�onal needs.
• Nurtured - Family interacts posi�vely through play/interac�ons.
• Achieving - Parents/Carers understand how their child learns in school and how this can be
supported at home, can prepare their child for transi�on onto primary/secondary, and have
improved skills through atending formal and informal training.
• Respected – Parents/Carers are involved in decision making processes about maters that
affect them and have increased opportuni�es or support within the community.
• Included - Family feels involved in their school community through atending a range of school
and family learning opportuni�es. 
53

Page 54

38 
Overview of Pupil Equity Funding
Pupil Equity Funding (PEF) is provided to head teachers to reduce the poverty related atainment gap
within their educa�on establishment. 95% of schools in Scotland have been allocated funding for
pupils in P1-S3 known to be eligible for free school meals. North Ayrshire schools have received Pupil
Equity Funding for six years with funding alloca�ons fixed un�l 2026. In total North Ayrshire schools
receive £4,172,180 in Pupil Equity Funding each year. A considerable effort has been made in the
2022-23 academic year to ensure PEF is fully utilised to reduce the poverty-related attainment gap.
This is evidenced by the significant reduction in PEF carried forward into the beginning of the next
financial year, which has reduced by almost 20%. 
Pupil Equity Funding must provide targeted support for children and young people affected by poverty
to achieve their full potential. Although the funding is allocated based on free school meal eligibility,
Head Teachers can use their professional judgement to determine which pupils receive targeted
support. All schools work with their school community to decide how to invest PEF and are encouraged
to use participatory budgeting approaches to inform decision making. Examples of how PEF has been
used in North Ayrshire’s schools this year are included in the next section of this report.
Head teachers have full autonomy to allocate PEF to address poverty related attainment gaps in their
school. Schools are also responsible for measuring and evaluating the impact of PEF interventions.
Approaches vary on a school-to-school basis but in most circumstances measurement of PEF impact
focuses on the pupils who benefit from the intervention at school level through qualitative and
quantitative data. A sample of the impact of a range of PEF interventions is included in this report,
however, information about all schools is also contained within individual school Standards and
Quality Reports, which are accessible via the Council website. 
54

Page 55

39 
PEF Case Studies 
PEF Case Study: Glebe Primary School 
(Linked to Priority 1 – Improving Atainment, par�cularly in literacy and numeracy)
Pupil Equity Funding was partly used in Glebe Primary School to fund addi�onal classroom assistants
to provide targeted support for children experiencing challenges engaging with learning due to social,
emo�onal, behavioural, and mental health needs. A range of approaches were put in place including
suppor�ng learners in small groups which has improved engagement in literacy and numeracy. All
pupils using the 5-minute Literacy box improved, with an average improvement of 25.8% across all
learners. Similarly, all pupils using the 5-minute Number box improved with an average improvement
of 13.6% across all learners. In addi�on, all pupils targeted through the Talk Boost interven�on
improved with an average improvement of 16.7% across all learners. Funding classroom assistants has
enabled the school to fund a variety of lunch�me clubs for sports and wellbeing. As a result, behaviour
in the playground has improved and pupils appear more respec�ul and engage beter with each other.
The recent Parent/Carer ques�onnaire said that 91% of parents feel behaviour in the school is posi�ve
which has increased by 19% since 2019. Feedback and pupil atendance at lunch�me clubs has been
very posi�ve with 84% of the school atending with all pupils atending at least one or more club per
week. Tracking of in and out of school wider achievement ac�vity ensures the school can encourage
pupils not atending any ac�vi�es as it is recognised this can be an important aspect of promo�ng
posi�ve mental health and wellbeing as well as engagement with learning through suppor�ng the
development rela�onships and social skills. 
PEF Case Study: St Mark’s Primary School
(Linked to Priority 2 – Closing the atainment gap between the most and least disadvantaged children
and young people)
St Mark’s Primary School have crea�vely used a small amount of their Pupil Equity Funding to restart
a breakfast club in October 2022. Since it re-started the school has a team of volunteers from the
community who provide a free breakfast to between 60 and 100 children daily between 8.30am and
8.55am. There have been mul�ple benefits for members of our school community with children all
given access to a free breakfast to ensure that no child is hungry and that they are ready to focus,
concentrate and learn as soon as the school day begins. Breakfast club has allowed children to meet
up with their friends and to make new friends as well as deepen connec�ons between the school and
the local community. This has been a support for parents helping to reduce the stress of the morning
rou�ne, cost of the school day and support parents to work. The school has also seen a reduc�on in
the number of late comings, as the children are able to have breakfast in school. The breakfast club
has been very well received by new families and was welcomed back by exis�ng children and families.
Work is currently underway to ensure the school can measure the impact of the breakfast club through
the 4 capaci�es with a focus on promo�ng this support to families who may benefit from the breakfast
club. 
PEF Case Study: Elderbank Primary School
(Linked to Priority 4 – Improvement in children and young people’s health and wellbeing)
55

Page 56

40 
Elderbank Primary School has used some of its Pupil Equity Funding to support mental health and
wellbeing of learners through enhancing pastoral support and developing a health and wellbeing
programme. A key part of this has been star�ng to use the Glasgow Mo�va�onal and Wellbeing Profile
as an assessment tool, targe�ng groups of P5 and P6 pupils. Data shows improvement for all pupils
across SHANARRI indicators with progress varying from incremental to significant. A new pastoral
support teacher has provided advice to prac��oners on suppor�ng behaviour within the classroom
and ensuring classroom environments can effec�vely meet individual pupil needs. The CIRCLE resource
has been used as a guiding document, providing an au�sm and dyslexia friendly classroom where
pupils feel safe and included within a differen�ated se�ng, including an accessible calm area where
�me can be taken to self-regulate. Professional learning opportuni�es have been offered to class
teachers and support staff on a range of topics including children experiencing distressed behaviour,
nurture, change and loss, and restora�ve prac�ce.  The pastoral support teacher has also worked
closely with parents/carers and other partners to address low atendance and social anxie�es around
coming to school to ensure the best level of care, support and communica�on is in place to improve
pupil outcomes. 
56

Page 57

41 
Progress towards our single-year Stretch Aims
For the first �me in 2022-23, all local authori�es were required to set stretch aims, to indicate the
progress they intended to make on a range of improvement ac�vi�es. In the tables below, North
Ayrshire’s stretch aims for 2022-23 are recorded along with the baseline posi�on in 2022 and the actual
posi�on by August 2023. Most of the stretch aims were not achieved. The legacy impacts of the COVID
pandemic are s�ll evident. To show progress over a longer �me frame, this year’s data has been
compared with our performance from two years ago (for curriculum for excellence levels) or from four
years ago (for all other stretch aims). Since originally publishing its guidance on stretch aims in 2022,
the Sco�sh Government has now revised this approach, reques�ng that local authori�es set stretch
aims over a longer �me frame. North Ayrshire Council had already created longer-term stretch aims
last year and an update on progress is provided at the end of this sec�on.
Stretch Aim 1
The propor�on of learners in North Ayrshire who achieve the expected levels of atainment in
literacy at P1, P4 and P7 will increase. 
All learners SIMD Q1 SIMD Q2-5 Gap Q1 vv Q2-5
2022 baseline 67% 60% 74% -14pp
2023 stretch aim 71% 67% 75% -8pp
2023 actual 68% 62% 74% -12pp
1-year progress
(2022-23) Improved Improved No change Improved
2-year progress
(2021-23) Improved Improved Improved Improved 
Stretch Aim 2
The propor�on of learners in North Ayrshire who achieve the expected levels of atainment in
numeracy at P1, P4 and P7 will increase. 
All learners SIMD Q1 SIMD Q2-5 Gap Q1 vv Q2-5
2022 baseline 75% 69% 81% -12pp
2023 stretch aim 77% 72% 81% -9pp
2023 actual 76% 71% 80% -9pp
1-year progress
(2022-23) Improved Improved Not Improved Improved
2-year progress
(2021-23) Improved Improved Improved Improved 
Stretch Aim 3
The propor�on of school leavers who achieve one or more passes at SCQF Level 5 (grades A-C or
beter will increase. 
All learners SIMD Q1 SIMD Q2-5 Gap Q1 vv Q2-5
2022 baseline 87% 81% 92% -11pp
2023 stretch aim 88% 82% 92% -10pp
2023 actual 86% 79% 92% -13pp
1-year progress
(2022-23) Not Improved Not Improved No change Not Improved
4-year progress
(2019-23) Improved Improved Improved Improved 
57

Page 58

42 
Stretch Aim 4
The propor�on of school leavers who achieve one or more passes at SCQF Level 6 (grades A-C or
beter will increase. 
All learners SIMD Q1 SIMD Q2-5 Gap Q1 vv Q2-5
2022 baseline 64% 54% 72% -18pp
2023 stretch aim 65% 55% 72% -17pp
2023 actual 60% 45% 71% -26pp
1-year progress
(2022-23) Not Improved Not Improved Not Improved Not Improved
4-year progress
(2019-23) Improved Improved Improved Not Improved 
Stretch Aim 5
The propor�on of 16-19 year olds who are par�cipa�ng in educa�on, employment or training will
increase. 
All learners SIMD Q1 SIMD Q2-5 Gap Q1 vv Q2-5
2022 baseline 91% 88% 93% -5pp
2023 stretch aim 91% 89% 93% -4pp
2023 actual 94% 91% 95% -4pp
1-year progress
(2022-23) Improved Improved Improved Improved
4-year progress
(2019-23) Improved Improved Improved Improved 
Stretch Aim 6
School atendance levels will increase. 
All learners SIMD Q1 SIMD Q2-5 Gap Q1 vv Q2-5
2022 baseline 89% 88% 91% -3pp
2023 stretch aim 91% 89% 92% -3pp
2023 actual 89% 87% 91% -4pp
1-year progress
(2022-23) Not improved Not improved Not improved Not improved
4-year progress
(2019-23) Not improved Not improved Not improved Not improved 
Stretch Aim 7
Exclusion incidents (per 1000) will reduce. 
All learners SIMD Q1 SIMD Q2-5 Gap Q1 vv Q2-5
2022 baseline 18 26 11 15
2023 stretch aim 15 22 10 12
2023 actual    
1-year progress
(2022-23)    
4-year progress
(2019-23)     
58

Page 59

43 
Progress towards our longer-term stretch aims
In 2022, we set out our ambi�ons for improvement in a range of educa�onal measures by 2027.
Our longer-term stretch aims are that by 2027…
• 450 more learners in our primary schools will achieve the expected levels of atainment in
literacy. By 2023, we are beginning to make progress towards this stretch aim.
• 250 more learners in our primary schools will achieve the expected levels of atainment in
numeracy. By 2023, we are beginning to make progress towards this stretch aim.
• Over 90% of our school leavers will achieve at least one qualifica�on at SCQF Level 5 / Na�onal
5 or beter. By 2023, we are making good progress towards this stretch aim.
• Over three quarters of our school leavers will achieve at least one qualifica�on at SCQF Level
6/Higher or beter. By 2023, we are making some progress towards this stretch aim.
• At least 165 more 16-19 year-olds will be par�cipa�ng in educa�on, training or employment.
By 2023, we are making very good progress towards this stretch aim.
• More than two thirds of our pupils will have over 90% atendance in our schools. By 2023, we
are beginning to make progress towards this stretch aim.
• We will reduce our exclusion rate to no more than 10 per 1000 pupils. By 2023, we are
beginning to make progress towards this stretch aim.
• We will reduce the overall gaps in atainment between the most and least disadvantaged
learners by an average of 5 percentage points. By 2023, we are beginning to make progress
towards this stretch aim.
59

Page 60

60

Page 61

NORTH AYRSHIRE COUNCIL 
03 October 2023 
Cabinet 
Title:    Chief Social Work Officer Annual Report 2022/23 
Purpose:  To provide Cabinet with awareness of the annual Chief Social
Work Officer report which is required by the Scottish Government.
Recommendation:  Cabinet members are asked to note:
1. the contents of this report, in particular the successes and
challenges and;
2. the skilled and compassionate interventions of our
practitioners and managers 
1. Executive Summary 
1.1  There is a requirement for every Local Authority to appoint a professionally qualified
Chief Social Work Officer (CSWO) and this is contained within Section 3 of the Social
Work (Scotland) Act 1968 as amended by Section 45 of the Local Government etc.
(Scotland) Act 1994. 
1.2   In line with the legislation and guidance, the CSWO is required to prepare an annual
report for the Council, on all statutory, governance and leadership functions of their
CSWO role. 
1.3 Given all social work and social care functions have been formally delegated to the
Integrated Joint Board this report will also be presented to them at a future meeting. 
2. Background 
2.1  In 2014, the Office of the Chief Social Work Adviser, following consultation with
CSWOs across Scotland, SOLACE and others, identified a more standardised
approach to prepare the annual reports. 
2.2 The report provides an overview by the CSWO of the partnership structures,
governance arrangements and the performance of social services in the context of
the demographic landscape of North Ayrshire. It looks more closely at the statutory
functions of the service and the quality and workforce development within our services.
The report is also forward looking, reviewing the preparation for key legislative
changes that will impact on our delivery and outlining the key challenges the service
will be facing in the forthcoming year. 
Agenda Item 4
61

Page 62

2.3  The report highlights the range of Social Work activity throughout the year and places
that in the context of the socioeconomic challenges faced locally. 
3. Proposals 
3.1 It is proposed that Cabinet notes the key themes and challenges detailed in the report
and that it endorses the report as set out in Appendix 1. 
3.2   Anticipated Outcomes
That North Ayrshire Council, the Integration Joint Board, and the Scottish Government
are made aware of the positive impact of Social Work Services in North Ayrshire as
well as the significant challenges that are being faced. 
3.3   Measuring Impact
Impact will be measured in terms of the direction and support to continue to transform
the delivery of Social Work Services. 
4. Implications/Socio-economic Duty 
Financial
4.1 None 
Human Resources
4.2 None 
Legal
4.3 None 
Equality/Socio-economic
4.4 None 
Environmental and Sustainability
4.5 None 
Key Priorities 
4.6 This report covers matters which contribute to the key priorities around vulnerable
children and adults within North Ayrshire, the Council and IJB Strategic Plans. 
Community Wealth Building
4.7 None  
62

Page 63

5. Consultation 
5.1 The Extended Partnership Senior Management Team have contributed to the contents
of this report. 
Caroline Cameron
Director HSCP/Chief Officer 
For further information please contact Scott Hunter , Chief Social Work Officer , on
scotthunter@north-ayrshire.gov.uk . 
Background Papers
Appendix 1, CSWO Annual Report 2022/2023 
63

Page 64

/ 
Chief Social Work Officer
Report
2022 – 2023
64

Page 65

Contents
Introduction .............................................................................................................. 1
Demographics .......................................................................................................... 2
Locality Planning ...................................................................................................... 3
1. Governance, Accountability and Statutory Functions ................................... 4
1.1 Overview of the North Ayrshire Health and Social Care Partnership ............ 7
Visions, Values and Priorities .............................................................................. 7
2. Service Quality and Performance ..................................................................... 8
2.1 Children, Families and Justice Services ........................................................ 8
The Promise ........................................................................................................ 8
North Ayrshire Champions Board ........................................................................ 9
Supporting Unaccompanied Young People ....................................................... 10
Signs of Safety................................................................................................... 10
Stronger Families ............................................................................................... 11
Rosemount Project ............................................................................................ 11
Safe and Together Model .................................................................................. 12
Child Sexual Abuse Strategy ............................................................................. 12
Key Performance Indicators .............................................................................. 13
2.2 Adults .......................................................................................................... 16
North Ayrshire Drug and Alcohol Service .......................................................... 16
North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation (eICT)
........................................................................................................................... 17
Learning Disability Integrated Community Team ............................................... 18
Care at Home .................................................................................................... 19
Red Rose House ............................................................................................... 20
Carers Team ...................................................................................................... 20
Supported Accommodation ............................................................................... 21
Money Matters ................................................................................................... 21
Mental Health Officer Team ............................................................................... 22
MARAC .............................................................................................................. 22
Self-Directed Support & Ayrshire Independent Living ........................................ 22
The Dirrans Centre ............................................................................................ 23
Older Peoples Day Services .............................................................................. 23
North Ayrshire Adult Community Mental Health Services .................................. 24
65

Page 66

Trindlemoss Day Opportunities.......................................................................... 25
Alcohol and Drug Liaison Team ......................................................................... 25
Short Term Support Worker Recovery Team .................................................... 25
Mental Health Social Work Care Management Team ........................................ 25
Harper House .................................................................................................... 25
2.3 Criminal Justice ........................................................................................... 26
Justice Services Locality Teams ........................................................................ 26
Electronic Monitoring of Bail .............................................................................. 26
Counsellor ......................................................................................................... 27
Refugee Team ................................................................................................... 27
Community Payback Orders .............................................................................. 27
Drug Treatment and Testing Order .................................................................... 28
Diversion from Prosecution ................................................................................ 29
Key Performance Indicators .............................................................................. 30
3. Resources ........................................................................................................ 32
3.1 Financial Pressures ..................................................................................... 32
3.2 Financial Performance ................................................................................ 33
3.3 Medium Term Financial Outlook ................................................................. 34
4. Workforce ......................................................................................................... 35
4.1 Workforce Planning – Staffing and Recruitment Issues .............................. 35
4.2 Workforce Support and Development ......................................................... 37 
66

Page 67

1 
Introduction
Welcome 
It is a pleasure to introduce this year’s annual Chief Social Work Officer report for
North Ayrshire which covers the period 1st April 2022 through 31st March 2023.  
I noted in my introduction last year that Social Work services remained in
unprecedented times and of the value of a unified voice to ensure the role of Social
Work is better understood. Upon reflection I start this year’s report in the same place.
The year past has seen challenges in relation to risk, market stability and resourcing
all set against the familiar backdrop of financial pressures.  It is humbling to note that
in these cases of adversity Partnership staff and colleagues across the health and
social care sector responded with professionalism to ensure the best outcomes
possible.
The year past has also seen positive contributions to individuals, families and
communities across North Ayrshire.  Partnership staff and partner agencies have
worked together with commitment and compassion to maintain service levels against
an exceptionally challenging environment. I would also like to place on record my
thanks to colleagues we work with across the statutory and third sector and our
independent partners.  We are very much stronger together.
In the year ahead we will continue to ensure our Social Work services work in a way
that puts our residents at the centre of their care. We will also seek to ensure that
when protective measures are required, these are applied in such a way that
ensures the safety of those affected and includes them wherever possible. 
Finally, I would also like to place on record my appreciation for the compassion and
commitment displayed day in, day out by our practitioners, managers, and business
support staff to ensure that Social Work and Social Care services are delivered to
the best of our abilities to our communities 
Scott Hunter
Chief Social Work Officer
North Ayrshire Health and Social Care Partnership 
67

Page 68

2 
Demographics
North Ayrshire is home to approximately 134,220 people, (National Records for
Scotland, Mid-2021 Population Estimates Scotland) all living in its many towns,
villages, and islands, with slightly more females (52.5%) than males (47.5%). 16.3%
of the population are aged 0 to 15 years, 9.8% are aged 16 to 24 years, 21.5% are
aged 25 to 44, 29.1% are aged 45 to 64 years of age, 13.1% ages between 65 to 74
years of age, with 10.2% of our population aged 75 years and above. 
The latest update of the Scottish Index of Multiple Deprivation has reconfirmed the
deep structural challenges faced by many communities in North Ayrshire, despite
steady progress by North Ayrshire Council in its ongoing commitment to eradicate
poverty. North Ayrshire is ranked as the fifth most deprived council area in Scotland. 
Some of the area’s most heavily affected by deprivation are concentrated in the
Three Towns and Irvine areas but areas in Kilwinning and the Garnock Valley also
have above average deprivation. 
68

Page 69

3 
Locality Planning
Our six Locality Planning Forums (LPFs) are one of our key mechanisms for
engaging with local people. They are chaired by a member of our Integration Joint
Board (IJB) and membership is made up of a range of health and social care
professionals, third and independent sector representatives and local community
groups. Their role is to use their knowledge of services and the local area to support
and engage with local people and communities, to identify locality priorities. 
In all, nine priorities were identified - seven areas of concern and two areas of
opportunity. 
Priorities of Concern: 
All mainland locality planning forums adopted the priorities below:
• Improving Mental Health and Wellbeing 
• Reducing social isolation
• Prevention, early intervention and recovery from drug and alcohol related harms
and deaths 
• Recovering from the COVID experience 
Due to additional local concerns, other identified priorities were adopted in specific
localities: 
• Enabling financial inclusion and tackling poverty, was adopted in the Three Towns
• Enabling digital inclusion, was also adopted in Three Towns 
• Preventing suicides, was adopted by the LPF in North Coast and Cumbrae 
Priorities of Opportunity: 
The following priorities are shared by all Locality Planning Forums:
• Capitalising on the Covid experience – continuing the legacy of the great
partnership working that was developed in the early stages of the pandemic.
• Developing personal self-care/ self-management, coping skills and health literacy 
Supporting the local priorities 
To help address the identified priorities, our locality planning forums will continue to
play a key role in understanding and identifying local need, and continue to feed into
the Strategic Planning Group, ensuring the profile of our localities is at the heart of
our strategic planning process.  
69

Page 70

4 
1. Governance, Accountability and Statutory Functions
The Chief Social Work Officer is a statutory appointment by virtue of Section 3 of the
Social Work (Scotland) Act 1968. The Chief Social Work Officer is appointed for the
purposes of the Council's functions under the 1968 Act and under those other
enactments listed in Section 5(1B) of that Act. In broad terms, those functions cover
all social work and social care services whether provided directly by the council, in
partnership with other agencies, or procured by the council and provided by others
on its behalf. Those functions are referred to as “social work services”. 
The qualifications required for the post are set out in the Qualifications of Chief
Social Work Officers (Scotland) Regulations 1996. The Chief Social Work Officer is
required by section 5(1) of the 1968 Act to carry out the duties of the post under the
general guidance of the Scottish Ministers. The Scottish Ministers issued revised and
finalised guidance in January 2010. 
The overall powers of the Chief Social Work Officer post are:- 
(a) To oversee the discharge of the council's statutory social work duties; 
(b) To ensure the provision of effective professional and objective advice to elected
members and officers of the Council in the Council's provision of social work
services; 
(c) To secure the effective provision of social work services. 
The powers of the Chief Social Work Officer fall into two broad categories; service
provision and corporate responsibility:
Service provision
• To establish and develop social work services focussed on the needs of
service users, to promote the continuous improvement of those services, and
to monitor and raise standards of their delivery; 
• To ensure the effective governance of the balance of need, risk and civil
liberties in the provision of social work services in accordance with
professional practice; 
• To provide advice on all aspects of workforce planning including safe
recruitment practice, supervision, monitoring and assessment of social work
students, securing of professional qualifications and continuous learning and
development for staff, and supporting and advising managers in all aspects of
staff supervision; 
• To ensure the existence of systems to both promote good practice and
identify and address poor practice in the provision of social work services; 
• To ensure that significant case reviews are undertaken of all critical incidents
either resulting in, or which may have resulted in, serious harm or death; and
2. Corporate Responsibilities
70

Page 71

5 
Corporate responsibility
The Chief Social Work Officer has the following corporate powers which require
direct access to the Council's Chief Executive’, Elected Members of the Council and
the Chief Officer, and the provision of forthright and independent advice to them:- 
• To ensure compliance with the Council’s statutory duties to prepare, publish
and review plans for the provision of social work services. 
• To promote, communicate, support and review values and standards of
professional practice, and to ensure that they are adhered to. 
• To establish, in conjunction with the Council's Corporate Management Team,
appropriate experience and qualified cover for the post of Chief Social Work
Officer during the post-holder's absence or incapacity. 
• To report to the Chief Executive and Chief Officer any failure in the Council's
corporate policy or governance arrangements designed to reflect the proper
balance amongst need, risk and civil liberties in the provision and
management of social work services. 
• To report to the Chief Executive and Chief Officer any weaknesses and
failures in the systems in place to promote good practice and identify and
address poor practice in the provision of social work services. 
• To report and provide independent comment where necessary to the Chief
Executive, Elected Members of the Council and the Chief Officer on the
findings of significant case reviews and relevant performance reports and on
any other social work related issues. 
• To provide an annual report to the Council on all of the statutory, governance
and leadership functions of the role of the Chief Social Work Officer
North Ayrshire continues to invest in its oversight of Social Work activity through the
provision of a standalone Chief Social Work Officer, further supported by a formal
Depute CSWO. The CSWO reports directly to the Director of the NAHSCP and has a
direct line to the Chief Executive of the Council. The CSWO represents Social Work
within a range of strategic groups including:
IJB, IJB Performance and Audit Committee, IJB Strategic Planning Group, NAHSCP
Health Care Governance Committee, HSCP Partnership Senior Management Team,
Alcohol and Drugs Partnership, Child Protection Committee, Adult Protection
Committee, Chief Officers Group, Carers Advisory Group, Children’s Services
Strategic Planning Partnership; Corporate Parenting Board, Transitions Strategic
Group amongst others.
The CSWO also provides professional oversight as a member of the Care Home
Oversight Group and the Care at Home Oversight Group. These groups continue to
fulfil key governance activity in relation to the Social Care sector. These groups have
worked closely in the year past to manage high risk situations in relation to market
failure in the Care at Home Sector and the closure of a residential care home
following poor inspection reports.
71

Page 72

6 
The CSWO has regular contact with the Independent Chair of CPC and APC to
ensure public protection oversight. The year past has seen North Ayrshire
commission one learning review. As often happens, the timescale for reporting
remain unclear as a result of ongoing activity with our Police and Fiscal colleagues.
Professional support and guidance over the year has been offered in relation to high-
risk justice cases including our first management of a lifelong restriction order, as
well as in relation to Prevent activity. The CSWO also sits on the pan Ayrshire
Strategic Oversight Group for the implementation of the new Joint Investigative
Process.
Social Work and Social Care matters are regularly reported to the IJB and Clinical
and Care Governance Committee. There is a particular focus on the impact of policy
and external scrutiny activity. The CSWO maintains regular calls with our Care
Inspectorate strategic link to share developments and hear of national developments
that support activity in North Ayrshire. The CSWO also contributes to quarterly calls
with the inspectorate and the broader PSMT.
The primary governance of practice matters remains the Social Work Governance
Board. The board terms of reference and membership have been refreshed in the
current year with the support of the professional leadership group. The board has
had a full agenda of issues over the year and has provided support and governance
in relation to a range of matters including:
• Signs of Safety Implementation
• Policy and procedure refresh across children and mental health services
• Review of Self Directed Support 
• Unaccompanied Asylum Seeking Children
• Developing Community Social Work Models
• Ensuring oversight on the impact on practice of new ways of working
• Demand and Capacity Issues
• Guardianship and MHO developments
• Developing career progression and qualification pathways 
72

Page 73

7 
1.1 Overview of the North Ayrshire Health and Social Care Partnership 
Visions, Values and Priorities
Our Partnership includes health and social care services within Health and
Community Care Services (H&CC), Mental Health and Learning Disability
Services and Children, Families and Justice Services. 
In this report, we look back on the progress we have made, share some of our
successes and reflect on some areas that have proved challenging. 
This report aligns with our “Caring Together” Strategic Commissioning Plan 2022-
2030. This is the first time the Health and Social Care Partnership has set out such a
long-term plan for how we intend to improve services and the health and wellbeing of
the local community. The plan set out our pandemic recovery intentions, as well as
offering a longer-term vision for local health and social care services. Over the period
of this strategic plan, the Health and Social Care Partnership will seek to: 
We see these priorities as interlinked, and we expect that where we see success
against one priority, it’s effect will positively impact against others.
People who use our services and North Ayrshire residents will experience our
Partnership values in the way our staff and volunteers engage with you and how we
behave. We will treat you with: 
73

Page 74

8 
2. Service Quality and Performance 
2.1 Children, Families and Justice Services
The Promise
North Ayrshire held its first ever Promise conference on Friday 4th November 2022.
This was the first conference of its kind not only in Ayrshire but across Scotland.
Over 120 delegates from a variety of multi-agency partners attended while 23 Care
Experienced Young People and their families attended.
The conference was facilitated by two of our wonderful
young people and we were delighted to have opening
remarks from Councillor Macaulay, Portfolio Holder for
Education and Young People, and the Minister for
Children and Young People, Clare Haughey.
We also officially launched Hasta Barista; our brand-new
barista bar based in Meadowcroft. The day was hugely
enjoyed by all and initial feedback from delegates has
been overwhelmingly positive with several commenting
that they felt “inspired”.
March saw the commencement of two Care Experienced
Youth Groups - Mini and Junior Champs - which alternate
between the Three Towns and Irvine. The aim of these
groups is to create safe spaces for young people,
encourage positive transitions, improve wellbeing and
promote positive relationships.
The recruitment process for posts in HSCP has been reviewed by the team, HSCP
managers and care experienced young people. This means Care Experienced
Young People will have a say in posts which relate to that area.
The Promise is a large-scale, complex 10-year change programme with multiple
objectives and interlinked activities, across multiple partners that sets out a clear
commitment for all corporate parents to have an enhanced understanding of the
experiences of those who have spent time in care. Progress continued this year with
The Language and Communications Subgroup focusing on:
• A new North Ayrshire Will Keep The Promise Social Media Channel
To reinforce that The Promise is a shared duty between corporate parents, the
subgroup has decided that communications and updates around The Promise will
no longer come from the Corporate Parenting Team but instead there will be a
new social media channel set up for all corporate parents to post content. 
74

Page 75

9 
• Forming a Care Experienced Youth Executive Group
To give care experienced young people a platform to use their voice in front of
Cabinet members and Parliament and initiate real change. The young people
involved will help to
support the rights of fellow care experienced young
people in North Ayrshire.
• A Let’s Talk About Language Day
To reframe the care experience narrative, we want to
partner up with health, education, and Connected
Communities to launch a North Ayrshire-wide event
around the clinical, stigmatising, dehumanising and
outdated language that is used when referring to care
experience, mental illnesses, sexualities, and disabilities. 
North Ayrshire Champions Board 
North Ayrshire Champions Board ran a summer programme for care experienced
young people. Taking place during July and August 2022, a range of activities were
on offer over ten days at various locations. Activities included Laser Quest, Nature
Trail and Outdoor Activities and a Champs Carnival at Eglinton Park where everyone
could enjoy a petting zoo, bouncy castle, and a silent disco. 
During October, the champs ran a Halloween Party for Care Experienced Young
People, including dookin' for apples, cake decorating, arts and crafts and mummy
wrapping. They also took a group of young people to Kelburn country park for the
thrilling walk through the estate. The young people loved it!
The targeted holiday events continued into the festive period as The Champs, in
partnership with the Corporate Parenting Team, used money from The Youth
Participatory Budgeting Fund, to host a Christmas meal for Care Experienced
families. The families were provided a three-course meal, by Cafe Solace, and all
children were invited to join in on festive activities, which included an appearance
from Santa!
Those that couldn't make the Christmas meal were invited to a fun filled, festive day,
where there were activities like s'more making, gingerbread decorating, Christmas
card making and football by lots of different partners such as Woodland Wake Up
and Active Schools.
North Ayrshire Champions Board have signed a three-year contract with Focus Gov
to develop an app specifically for Care Experienced Young people. The app, which
will be known as CE4U, will detail support, tips, and tricks and even blog posts from
care experienced peers. It will be a fundamental resource, specifically for those
without a key worker. 
75

Page 76

10 
Supporting Unaccompanied Young People
Supporting Unaccompanied Young People - Natalie Mitchell co-produced a new
welcome pack with a previous resident for young people where English is not their
first language. The new pack includes basic information of what a children’s house is
and what supports residential staff can offer a young person. The highlight of the
pack is where a previous ex resident details his experience, how he felt and where
he is now. The pack is a huge credit to the hard work of the staff and will
undoubtedly alleviate stress when young people who do not speak English, come
into our care.
The Meadows have also sourced music tuition for 3 Vietnamese young people to
participate in together. A local musician/sound engineer visits the house on a weekly
basis where he facilitates a 2-hour jamming session with different instruments as
well as showing them some production techniques and how to read music. 
Signs of Safety
Signs of Safety is a strength and safety organised model of practice which has
been evaluated as effective in driving cultural change. 
Signs of Safety states this approach, “is an integrated framework for how to do child
intervention work – the principles for practice; a range of tools for assessment and
planning, decision making and engaging children and families; the disciplines for
practitioners’ application of the approach; and processes through which the work is
undertaken with families and children, and partner agencies.
Signs of Safety practice enables child welfare intervention to be the catalyst for
behaviour change by families and empowers them to make these changes. It utilises
plain language and embodies aspects of change identified through the Promise in
working alongside families building meaningful relationships and empowering their
voices within the complex relationships that often arise from the complexity
associated with Child welfare child protection work.”
Evaluation from areas that have implemented Signs of Safety has indicated: 
• Families feel more empowered and are more able to understand and
address the concerns and requirements of child protection authorities.
• Other things being equal, the number of children removed from families
reduces relative to the number of families with whom authorities work
more intensively to build safety around the children.
• Practitioners report greater job satisfaction due to the clarity of the
approach, the usefulness of the tools and the impact for the children and
families. 
North Ayrshire have agreed an implementation plan to take forward Signs of Safety
which will initially include bespoke training for Children and Families staff and
briefing sessions took place throughout 2022 and beyond. 
76

Page 77

11 
Stronger Families
The Stronger Families services was launched 1st of September 2022. This is a new
initiative which will be delivered as part of a partnership between Service
Access/Multi Agency Assessment and Hub (MAASH),
Alcohol and Drug Partnership (ADP) and Barnardo’s.
The service provides the following:
• Practical and emotional support, advice and
opportunities to Children, Young People and
Families affected by Substance Use in North
Ayrshire.
• Supporting families to reduce the need for
statutory intervention.
• Substance use awareness, practical and
emotional support improved family
relationships.
• Linking young people and families in with the
local community
• Support to access addiction services and links with recovery community.
Rosemount Project
From 1st April 2022 to 31st March 2023, the Rosemount Project supported 496
children, parents/carers, and extended family members. The service is committed to
whole family support and endeavours to involve siblings, parents/carers, and
extended family members, in the interventions and family work that the service
facilitates. The ongoing implementation of the Signs of Safety framework correlates
well with the ethos and role that the Rosemount Project provides, which is predicated
on assisting families to develop their networks of support and empowering them to
build sustainable strategies, reducing their dependence on social services in the
longer-term.
For the financial year ending 31st March 2023, there was a 37% increase in the
number of individuals supported from the previous year (up to 496 from 314 in
2021/22). The previous year (2021/22) had seen a 12% increase in referrals from
2020/21, thus, the past year’s figures continue to reflect a growth in individuals who
received some form of advice, guidance and/or practical support from the service.
Again, we expect these figures to remain high with the greater emphasis being
placed on engaging with family networks and upskilling families to rely on their
natural resources to meet their specific needs.
The Rosemount team had access to the Care Experienced Children and Young
People Fund which enabled a mentoring service to be introduced to enhance
prosocial support to vulnerable young people over the school period.
One of our young people TC said “I like mentoring because its enjoyable and gives
me a chance to do more interactive activities. My mentor is a very outgoing guy who
77

Page 78

12 
is amazing to have a conversation with. He is also a great mentor because if I have
any troubles, I can speak to him about them.”
Safe and Together Model 
Based on domestic abuse research, the Safe and Together Model has been
implemented in North Ayrshire. The model is key to realising the Pan Ayrshire vision
and directs us to reframe domestic abuse “as a parenting choice”, and it shifts
assessments towards a “perpetrator pattern-based” approach as opposed to solely
focusing on incidents, which is crucial in the assessment of risk to a child and their
non-abusing parent. The model provides a suite of assessment tools and enables
practitioners to challenge and address the gender-based nature of domestic abuse
through the following model principles:
• Keeping the child safe and together with the non-abusing parent. This is usually
the most effective way to promote children's safety, healing from trauma, stability
and nurturance.
• Partnering with the non-abusing parent in a strengths-based way. This approach
is likely to be the most efficient and child centred way of assessing risk through
mutual information sharing.
• Intervening with the offending parent to reduce risk and harm to the child.
Engaging and holding them accountable in a variety of ways, including
connecting them to their parenting role, reduces the risks to children. 
We have 5 multiagency trainers accredited to deliver the Safe and Together training,
in partnership with Women’s Aid as our third sector partners who also work to ensure
the voices of those with lived experience are included. We have delivered Safe and
Together overview sessions to over 249 staff, and more extensive training to 84
multiagency staff working at the heart of the Child welfare and child protection
system.
Child Sexual Abuse Strategy
North Ayrshire launched the first localised Child Sexual Abuse Strategy in Scotland
in Spring 2021. Progress to date, as well as what we intend to do next is available
via our progress update document on the NAHSCP website. 
We want everyone to understand what child sexual abuse is and the many forms it
can take, and we want to ensure that children and young people in North Ayrshire
are safe from sexual abuse and harm. 
You can access the strategy via the North Ayrshire Child Protection Committee
website, We regularly post on the NAHSCP Facebook and Twitter  pages to raise
awareness of child sexual abuse and get people talking more about the subject.
78

Page 79

13 
North Ayrshire have established a sub-group to take
forward the implementation of the National Child
Protection Guidance locally. Representation within the
group includes social work, universal early years and
education. Work within this group will be reported into
the Pan Ayrshire Child Protection Implementation
Group. 
A Pan Ayrshire workshop took place in October in Irvine
in the form of a World Café event. Practitioners from
across Ayrshire were invited to this session with the
main aim being to process map current child protection
guidance and procedures and establish a workplan for
each locality. The workshop was facilitated by Mark Inglis (HoS Children, Families
and Justice Services South Ayrshire), Moira McKinnon (Independent Chair East
Ayrshire) and Kirsty Calderwood (CPC Lead Officer North Ayrshire).
Key Performance Indicators
Child Protection 
2014
– 15
2015
– 16
2016
– 17
2017
– 18
2018
– 19
2019
– 20
2020
– 21
2021
– 22
2022-
23
Child Protection
Concerns 825 889 810 972 920 849 885 756 570
Child Protection
Investigations
(CP1s)
443 402 406 538 374 447 443 432 375
Child Protection
Initial
Conferences
101 82 74 103 126 123 121 119 76
Pre – Birth
Conferences  32 30 15 36 43 41 29 34 17
CP Initial/Pre-
Birth
Conferences 
4 7 4 9 
79

Page 80

14 
Looked after Children 
2014
– 15
2015
– 16
2016
– 17
2017
– 18
2018
– 19
2019
– 20
2020
– 21
2021
– 22
2022-
2023
Children newly
accommodated in
North Ayrshire
91 81 64 63 69 84 63 49 61
** Where the number of children accommodated = the number of children either
admitted into any placement type except “At Home with Parents”/”With
Friends/Relatives” OR moved from “At Home with Parents”/”With Friends/Relatives”
to any other placement type  
2014
– 15
2015
– 16
2016
– 17
2017
– 18
2018
– 19
2019 –
20
2020
– 21
2021
– 22
2022-
23
Foster Carers  85 97 100 103 104 98 103 99 96 
Permanency
Planning
2013
– 14
2014
– 15
2015
– 16
2016
– 17
2017
– 18
2018
– 19
2019
– 20
2020
– 21
2021-
22
2022-
23
Number of
permanency
plans approved
25 38 22 37 35 - 30 10 21 19
Adoption –
approved and
placed 
3 15 13 10 10 10 3 8 5 7
Adoptions
granted 9 3 15 13 8 7 8 4 5 5
Permanence
orders approved  27 7 11 16 14 7 11 3 7 7
Permanence
orders granted 12 14 6 9 12 9 8 0 1 2 
2015
– 16 
2016
– 17 
2017
– 18 
2018
– 19 
2019
– 20
2020
– 21 
2021
– 22 
2022
– 23
Children Subject to
Compulsory Supervision
Orders
497 462 435 395 393 351 342 298 
2015
– 16
2016
– 17
2017
– 18
2018
– 19
2019
– 20
2020
– 21
2021
– 22
2022
– 23
Children with Compulsory
Supervision Orders
Terminated
167 152 147 157 140 102 101 102 
80

Page 81

15 
Emergency Placements 
2016
– 17
2017
– 18
2018 – 19 2019
– 20
2020
– 21
2021
– 22
2022 –
23
Child Protection
Orders  12 15 25 (17 family
groups) 32 39 11 18 
Secure Placements  
2016 –
17 
2017
– 18 
2018
– 19 
2019 –
20
2020
– 21 
2021
– 22 
2022-
23
Number of secure
placements 1 0 1 4 1 2 0 
Justice Services  
2017 – 18 2018 – 19 2019 – 20 2020 – 21 2021 – 22 2022 –
23
Number of
reports
submitted to
the courts
(CJSW
reports,
Section 203,
Short Notice
CJSW &
Supplementary
CJSW)
826 754 763 430 606 606
Number of
home leave
and
background
reports
submitted 
102 (44
leave
reports, 58
background
reports)
114 leave
reports – 49
background
- 65
151 (66
leave
reports, 85
background
reports)
114 (39
leave
reports, 75
background
reports)
93 (30
leave
reports, 63
background
reports)
91 (28
leave
reports, 63
backgroun
d reports)
Unpaid Work
Requirements 480 403 360 94 172 313         
2015 –
16
2016 –
17
2017 –
18
2018 –
19
2019 –
20
2020 –
21
2021 –
22
2022 –
23
Level 1 Mappa  142 155 153 181 163 152 172 190
Level 2 Mappa  14 4 7 2 7 10 14 27
Level 3 Mappa  1 1 2 1 5 3 7 2 
81

Page 82

16 
2.2  Adults
North Ayrshire Drug and Alcohol Service 
The North Ayrshire Drug and Alcohol Service (NADARS) has continued to
demonstrate high levels of performance by meeting national and local standards and
targets, such as access to treatment waiting times, provision of alcohol brief interventions
(ABIs), the roll-out of Naloxone supplies and increasing patient choice regarding Opiate
Substitution Therapy (OST) medications. 
The team continues to identify new ways of working to provide a more agile and
streamlined service and further improve performance. This work has been evidenced by
the delivery of early intervention services in the delivery of Alcohol Brief Interventions
(ABI) in both priority (Primary Care, A&E and Antenatal) and wider settings.   
2020-21 2021-22 2022-23
Target set by Scottish Government – Priority Settings  3,420 3,420 3,419
Total ABI delivery in Priority Settings (Ayrshire &
Arran)
5,920 5,776 4,699 
82

Page 83

17 
2020-21 2021-
22
2022-
23
Target set by Scottish Government in Wider
Settings 
856 856 855
Total ABI delivery in Wider Settings (Ayrshire &
Arran)
1,025 1,017 1,207 
The North Ayrshire Drug and Alcohol Service has continued to focus on delivering
actions and improvements to support the ‘National Mission’ in relation to the reduction of
drug and alcohol related harms. Key activities include:
• Continued roll out and expansion of the Medication Assisted Treatment (MAT)
standards with access to MAT support now being available 5 days a week.
Regular progress reports have been submitted to the Scottish Government and
an agreed MAT Improvement Implementation Plan is in place.
• Increased support to individuals following a Non-Fatal Overdose.
• Increased promotion and supply of Naloxone.
• Steering Group meetings arranged to focus on improvement actions to ensure
that there is increased support for individuals with ‘co-existing mental health
and drug and/or alcohol use.
• The roll-out of a new Alcohol and Drug Liaison Service across Ayrshire and
Arran.
• Compliance with all Alcohol and Drug ‘Access to Treatment’ waiting times
standards.
• Continued promotion and availability of drug and alcohol related training.
• Promotion and delivery of Alcohol Brief Interventions (ABI) across priority and
non-priority settings whilst continuing to meet the ABI national standards.
• New pathway and processes formally approved by the North Ayrshire Alcohol
and Drug Partnership (ADP) to support individuals into, during and after
external Residential Rehabilitation placements.
• Support to Phoenix Futures to open a new residential rehabilitation facility in
North Ayrshire to support families affected by drug and alcohol use (Harper
House officially opened in November 2022). 
North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation (eICT)
The North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation
(eICT) utilises multidisciplinary holistic interventions to focus on providing high-quality
care and support, through proactive early intervention and preventative action. They aim
to assist patients presenting with falls, frailty, low grade infections and general functional
decline to avoid hospital admission where possible and facilitating early discharge home
from hospitals. 
83

Page 84

18 
The North Ayrshire Enhanced Intermediate Care Team brings together the expertise of
dedicated Physiotherapists, Occupational Therapists, Technical Instructors, Dieticians,
Community Psychiatric Nurses, Pharmacists, Admin workers, Rehabilitation Nurses,
Advanced Nurse Practitioners, and Intermediate Care GP with special interest into one
single multidisciplinary and interdisciplinary team; focused on problem-solving for
patients in their own homes across all of mainland North Ayrshire. The seven-day
rehabilitation service facilitates early discharge from hospital and provides a rapid
alternative to acute hospital admissions. The Enhanced part of the team addresses
medical and clinical issues that limit a patient’s ability to engage in rehabilitation via a
shared care model with the patients registered GP. 
Learning Disability Integrated Community Team 
The Learning Disability Integrated Community Team continue to support a broad
range of assessment and treatment options within the community. This includes
psychological therapies (Beat it /Step Up), further development of the anti-psychotic
monitoring clinic (in the form of offering home visits to ensure inclusion) and ongoing
group-work to improve health. The differential diagnosis pathway continues to reduce the
amount of full intellectual assessments that were required previously. All patient facing
staff are trauma informed; in addition, there are a cohort of staff who are trained to
trauma enhanced and specialist level (Safety and Stabilisation). There is also the recent
84

Page 85

19 
formation of a local steering group with acute/primary colleagues to improve Menopause
information and care in the North Ayrshire population.
The team are also key to the establishment of the new Intensive Support Service, being
established to respond to the recommendations of the Coming Home report, and create
greater scope for the provision of high levels of multi-disciplinary support within the
community (beyond the scope of the existing community team), with the intention of
maintaining people in their homes. The team also work with individuals who remain in
assessment & treatment inpatient but are delayed discharge, meaning they are fit for
discharge but remain in hospital due to difficulties with appropriate community placement
provision. Also linked to the Coming Home report, the service is working towards the
implementation of a Dynamic Risk Register, as specified by Scottish Government, and
intended to aid in the oversight of individuals admitted to hospital settings, or at risk of
this. Service managers are also linking into Ayrshire wide discussions regarding the
implementation of annual health checks for people with learning disabilities within
primary care, as mandated by Scottish Government.
Care at Home
The Partnership’s inhouse Care at Home service was inspected by the Care
Inspectorate in May 2022 and received gradings of Very Good across all indicators:
• How well do we support peoples’ wellbeing? 
• People experience compassion, dignity and respect 
• People get the most out of life 
• People’s health and wellbeing benefits from their care and support
• How good is our care and support during the Covid-19 pandemic? 
• Infection prevention and control practices are safe for people experiencing
care and staff
• Leadership and staffing arrangements are responsive to the changing needs of
people experiencing care 
The positive comments made by people experiencing support or by their
relatives/representatives evidenced that the ethos and value base within the service
focussed on positive relationships, respect and the delivery of a high-quality service that
met people's needs and desired outcomes. This is an exceptional achievement for the
Care at Home service during what has been one of the most difficult times for health and
social care providers.
In 2023 a review was undertaken of the frontline Care at Home role which has been in
recognition of the ongoing development of the services delivered by this staff group.
From May 2022 until December 2022 a team of representatives from Care at Home
service undertook an exercise which has resulted in a re-evaluation of the Care at Home
role. This has been a positive development for the Care at Home service, who support
some of the most vulnerable people in our communities by delivering high quality person-
centred services. 
85

Page 86

20 
Red Rose House
Red Rose House officially opened on the 28th of October 2022, along with neighbouring
facility Roslin House. North Ayrshire Provost Anthea Dickson cut the ribbons to celebrate
the opening of the facilities in Stevenston in front of Elected Members, staff of North
Ayrshire Council and North Ayrshire Health and Social Care Partnership, as well as
invited guests from charities Hansel and the Mungo Foundation, who provide care and
support at the facilities. 
The respite centres, which are situated
adjacent to the Lockhart ASN Campus in
Stevenston, provide a comfortable, home
from home experience for respite guests and
a much needed, valued and deserved break
for families and carers.
Each facility is equipped with eight ensuite
bedrooms with homely furnishings and mood
lighting, as well as activity rooms, hi-tech
sensory rooms, games and TV rooms with
comfortable sofas, and a kitchen area where
guests can eat together or learn cooking
skills. The centres also boast fantastic
outdoor space with landscaped gardens for guests to enjoy, with a water feature, BBQ
areas, musical equipment and a heated hang-out den for teenagers.
Carers Team 
The Carers Team report 1,736 carers registered with our commissioned carer service
Unity on 31st March 2023, 1,517 are adult carers and 219 are young carers aged 18 or
under. This is a 25% increase from last year.  
For the reporting year, Social Work staff offered 449 Adult Carer Support Plans, and 94
were accepted with 56 completed. NAC Education staff reported 171 Young Carer
statements returned and 161 were completed. Over 3 times more than 2021/2022.
The National Carers Strategy was published in December 2022 which sets out a range of
actions to guide North Ayrshire Health & Social Care Partnership in our carer duties
under the Act and ensures carers are supported fully in a joined up and cohesive way.
In North Ayrshire progress is continuing at pace for expanding the reach of carer
services, improving carer identification, and increasing access to information,
assessment, and support for young and adult carers. To improve carer services
increased recurring investment was approved through governance structures which
enforces the commitment to continuous improvement for carer support.  
86

Page 87

21 
The reprovisioning of the commissioned carer service is the main activity to report. The
tender process commenced in October 2022 to seek a dynamic and creative strategic
partner to be more present and visible to deliver a sustainable and expanded carer
service. North Ayrshire Health & Social Care Partnership have engaged with the market
and conducted prior interest procurement activities. Plans are on schedule with the
successful supplier commencing May 2023 for a 3-year term. 
Supported Accommodation
The development of supported accommodations across several areas of North Ayrshire
has concluded, with all accommodations now open and final service users moving in.
The portfolio of supported accommodation for mental health, learning and physical
disabilities includes: 
• Bessie Dunlop Court (Dalry) 
• Bute Walk (Largs) 
• St. Michaels Wynd (Kilwinning) 
• Caley Gardens (Stevenston)   
Service providers are now in operation within the accommodations: 
• Cornerstone (Dalry) 
• Enable Scotland (Largs),
• The Richmond Fellowship Scotland (Kilwinning)
• Key Housing (Stevenston) 
Money Matters
Our Money Matters Team once again supported the most vulnerable people in our
communities, accessing entitled benefits to the incredible sum of £18,429,833.91, an
increase of almost £1 million pounds from 2021-22. This was achieved against a
backdrop of ongoing welfare reform and a complex benefits system. 
87

Page 88

22 
Mental Health Officer Team
The Mental Health Officer Team is now a standalone team within the Community
Mental Health Service, covering across the Health & Social Care Partnership. Providing
the service as a distinct team has enabled a clearer role definition, consistency of
approach and parity of esteem across the partnership. The addition of social work
assistants has also allowed for appropriate delegation of work, with guardianship reviews
now being a key component of their role. This means that guardianship reviews will be
undertaken as planned, timeously and on a recurring basis.
MARAC
MARAC (Multi-Agency Risk Assessment Conference) launched across North
Ayrshire in August 2022. MARAC is a local meeting where representatives from statutory
and non-statutory agencies meet to discuss individuals at high risk of serious harm or
murder as a result of domestic abuse. The meeting provides a safe environment for
agencies to share relevant and proportionate information about current risk, after which
agencies agree actions to reduce risk and increase safety. The primary focus of the
MARAC is to safeguard the adult victim. However, the MARAC will also make links with
other processes and agencies to safeguard children and manage the behaviour of the
perpetrator. MARACs are attended by a range of adult and children’s services including
Police Scotland, Women’s Aid, local authority and health services. Eight MARACs took
place between August and March 2023 with an average of 18-20 cases discussed per
meeting.
Self-Directed Support & Ayrshire Independent Living 
Self-Directed Support & Ayrshire Independent Living: In this reporting year, as part
of the Scottish Government Source Return, the Self-directed Support team submitted the
following figures demonstrating how people have directed their support.
Option 1:  198
Option 2:  152
Option 3:  2602 
Option 4:  116 
This shows traditional options continue to be offered or accessed most with 85% of
people receiving Option 3, where support is chosen, arranged and directed by the Health
and Social Care Partnership.
From a national perspective, there have been several directives and influencing factors
(below) to encourage North Ayrshire Health & Social Care Partnership to keep SDS at
the core of how we offer and deliver care and support.
• Revised Self-directed Support Guidance published November 2022
• Consultation has been ongoing on the draft Self-directed Support Improvement
Plan 2023 – 27 (pending publication).
• Revised Self-directed Support: Framework of Standards now including
Standard 12 Access to Budgets & Flexibility of Spend published August 2022
88

Page 89

23 
• National Care Service Bill (paused at Stage 1 with proposals to improve the
way social care is delivered).   
North Ayrshire Health & Social Care Partnership has agreed a
contractual extension on a pan Ayrshire basis to continue to
commission independent advice and information services from
Ayrshire Independent Living Network (AILN).
In the calendar year 2022 AILN reported supporting 433 people
(373 active) with 34% resident in North Ayrshire.  173 new referrals were received with
43% from North Ayrshire.
AILN continues to strengthen their offer through national and local improvements such as
work on the National Model Agreement for SDS Option 1 – Direct Payment, Personal
Assistant Programme Board developments, local peer mentor groups, dementia
befriending project, Personal Assistant employer and HNC Social care student training at
Ayrshire Colleges.  Events have also been arranged to improve Personal Assistant’s
health & wellbeing, and funding has been secured for AILN policy and website
improvements. 
The Dirrans Centre 
The Dirrans Centre, Kilwinning delivers personalised community-based rehabilitation
supports. The team continues to provide
support to our clients and provide a
combination of centre-based, and community
supports using learning from outcomes
achieved during the pandemic. This blended
approach ensures person-centred
interventions to maximise independence, self-
management of long-term conditions and
assisting with building sustainable links in the
local community. 
Older Peoples Day Services 
North Ayrshire Health and Social Care Partnership’s Older Peoples Day Services
temporarily closed early in 2020 due to the COVID-19 Pandemic, delivering alternative
supports during this time such as outreach and befriending services. A review of Day
Services was undertaken in 2021 and this identified the need for an alternative Day
Services model which would be an enhancement to the traditional building-based Day
Services model for Older People in North Ayrshire. This included opportunities to build on
some of the learning from during the pandemic to meet the outcomes of people in North
Ayrshire.
Older People’s Day Services had successfully re-opened by the end of August 2022.
Alzheimer’s Scotland commenced a new contract for the delivery of Day Services in
89

Page 90

24 
March 2023. This will see an enhancement of Day Service delivery for Older People in
North Ayrshire including a flexible and responsive service which will be operational
across 7 days providing up to 63 full day placements on a weekly basis.
North Ayrshire Adult Community Mental Health Services 
North Ayrshire Adult Community Mental Health Services. Despite several
challenges, the service has had a very successful year:  
• Throughout the year, our mental health services have been active contributors
to the Scottish Government engagement of the National Secondary Care
Standards for Mental Health Services consultation.  
• Throughout the year, our mental health services have also been active
contributors to the Scottish Government Delivery of psychological therapies
and interventions: national specification.
• The development of supported accommodations across several areas of North
Ayrshire has all but concluded, with all accommodations now open. This
includes Bessie Dunlop Court in Dalry, Bute Walk in Largs, St Michaels
Gardens in Kilwinning, and Caley Gardens in Stevenston. All accommodations
apart from St Michaels Gardens were delivered in partnership with the
Learning Disability service. 
• The Nethermains supported living facility in Kilwinning has also had
additionality added with a renovation of 2A Nethermains to add space for an
additional 2 individuals, the first person moved into this facility in March 2023.
• The development and implementation of pathways and care pathways within
and across services remain ongoing such as the development of the ‘Co-
occurring Mental Health and Substance use Pathway’ with North Ayrshire Drug
and Alcohol Service (NADARS) and the ‘Transitions Pathway’ with Child and
Adolescent Mental Health Team (CAMHS). 
• The Housing First Community Psychiatric Nurse (CPN) continues to work with
our partner agencies within the Housing First Team, working closely with
Addictions Social Work and with the support of a commissioned response
service, the first of its kind in Scotland. We have revised some aspects of this
role to include an educational component for housing staff.
• The college well-being and liaison role continues to work extremely well within
Ayrshire College and is across the 3 campuses, one in each partnership area
of Ayrshire. There has been agreement across the 3 partnership areas to
continue the funding of this post through until March 2025. This is extremely
positive for Ayrshire & Arran in light if the fact that Health Improvement
Scotland (HIS) met with us as they develop a framework for supporting
students, they were extremely impressed with the role we have developed and
will be adding many aspects of our model to the framework for other authorities
to develop similar roles. 
The service has also been working with our communities, primary care and third and
independent sectors in consultation, design and investment for transformation and is now
successfully progressing into our second year of funding for mental health and wellbeing
in communities. 
90

Page 91

25 
Trindlemoss Day Opportunities
Staff and customers have been involved at Trindlemoss Day Opportunities in a
collaborative art project with Glasgow School of Art with the aim of creating a range of
outputs reflective of the changes experienced
over the past couple of years, as well as
people's hopes for the future. 
There was a final handover session at
Trindlemoss in October 2022 where, Victoria
and Claire of Glasgow School of Art, spoke to
invited guests about their work on the project
and the collaborative journey they have
undertaken throughout it.
Alcohol and Drug Liaison Team 
A new Alcohol and Drug Liaison Team was launched in August 2022. This new team
replaces the previous Alcohol Liaison Team as well as the Non-Fatal Drug Overdose
Pathway and operates 7 days a week from 9am -7pm. Priority for the team is the
implementation of the MAT standards, 5 of which is pertinent to the team. The model
being used is under continual review and a proposal has been made to introduce an
Advanced Nurse Practitioner within the team using established funding.
Short Term Support Worker Recovery Team 
Short Term Support Worker Recovery Team – as a fantastic addition to the Mental
Health Social Work Team the Support Worker Recovery Team was developed to offer
short term support to individuals with Mental Health difficulties. The service has been
invaluable in facilitating timeous discharge from hospital support and preventing
unnecessary admissions.  It has also supported the service in the short term, with unmet
need whilst awaiting appropriate packages of care.  
Mental Health Social Work Care Management Team 
Mental Health Social Work Care Management Team - The Mental Health Social Work
Care Management Team became a standalone team within the Adult Community Mental
Health Service. The new focus aims and objectives of the team promotes service users
being assessed earlier and supported to engage in the most suitable care and treatment
to meet there needs. This has endorsed prevention and early intervention enabling
independence & enablement.
Harper House 
Harper House, the new National Specialist Residential Family Service for Scotland,
opened on the site of the former Seabank Nursing Home in Saltcoats. Developed and
operated by Phoenix Futures and funded by the Scottish Government, the service offers
91

Page 92

26 
safe, structured support for the whole family to address problematic drug and/or alcohol
use, improving both mental health and quality of life. 
Families stay together at the service, meaning that parents remain the carers of their
children at the same time as taking part in the programme. Alongside this, specialist
childcare staff provide support to
children and parents. NAHSCP looks
forward to continuing to work in
partnership with Phoenix Futures to
ensure the new service will become a
valuable source of support for families
affected by substance misuse not just
in North Ayrshire, but from across the
country.
2.3 Criminal Justice 
Justice Services Locality Teams 
A member of the Justice Services Locality Teams has received a Multi-Agency Public
Protection Arrangements (MAPPA) Multi-Agency partnership Award from the Surrey and
Sussex Strategic Management Board (SMB) meeting. Please see feedback below from
Surrey and Sussex Probation Service.
“Lisa’s work throughout the management of this case has been exceptional, she has
worked alongside partnership agencies to actively manage the risks the service user
poses.
Lisa continued to work tirelessly alongside Adult social care, mental health, police, and
children’s services to ensure the victim was protected.  
Her management and continued input to this case long after her official involvement
ended has been crucial to continued public protection and her contribution much valued
by the West Downs MAPPA panel. 
Lisa attended our SMB last week where she received the above award in recognition of
her excellent multi-agency work.”
Electronic Monitoring of Bail
Electronic Monitoring of Bail is a new service which was introduced at Kilmarnock
Sheriff Court on 17th May 2022. As with Bail Supervision, this service has been designed
to reduce individuals being remanded in custody and monitoring of the individual within
the community through radio frequency monitoring of a personal identification device
which is fitted around the ankle. Suitability assessments are undertaken by Justice Social
Work staff who are based within the Court. 
92

Page 93

27 
Counsellor
Using Covid-recovery money, Justice Services have been able to fund a Counsellor via
the Scottish Association for the Care and Resettlement of Offenders (SACRO) to provide
1:1 support for those experiencing isolation and anxiety to assist service users who, by
virtue of their offending, are excluded from many of the other social and personal support
routes that we take for granted. Although this service is still in the initial stages the 6
monthly report highlights a good level of engagement with this service along with positive
feedback from service users.
“Explained why I’m feeling the way I was and gave me hope.” 
“I would highly recommend counselling…. been a fantastic help at such a difficult time.” 
“Made things seem clearer about what would help me moving forward.”
Refugee Team 
The Refugee Team have employed two-Family Wellbeing Support Workers who
commenced their positions in January 2023. These new staff members will assist with
the rise in Ukrainian families arriving and resettling in North Ayrshire who require
sensitive, safe, and empowering support. In addition, North Ayrshire HSCP secured
Home Office funding through North Ayrshire Council to provide a dedicated nursing
resource for Ukrainian Displaced People (UDP) arriving in North Ayrshire. The small
team, which will consist of a manager, two staff nurses and a bilingual liaison officer, will
offer health assessments and screening to migrants, and facilitate their access to
mainstream services such as primary care and health visiting. 
Community Payback Orders
The latest Government statistics on Community Payback Orders (CPOs) (2021-22)
show that North Ayrshire had the highest of the Ayrshires with 420 CPOs, however, was
the lowest of the Ayrshires at 45.8 per 10,000 population. In comparison, East Ayrshire
had 412 CPOs and sits at 48.8 per 10,000 population and South Ayrshire had 367 CPOs
and sits at 48.7 per 10,000 population. The Scottish average is 31.5 per 10,000
population.
There was a steady decline in the number of Criminal Justice Social Work Reports
(CJSWs) from 2015-16 until 2019-20 where there was an indication of a slight upward
turn. 2020-21 saw a significant decline, thought largely to be due to the result of COVID-
19, however, numbers rose again in 2021-22 by 40% from the previous year. The latest
Government statistics on CJSWs for 2021-22 reveal North Ayrshire to be the lowest of
the Ayrshires at 66 per 10,000 population. In comparison, East Ayrshire sits at 90.9 and
South Ayrshire sits at 67.3. The Scottish average is 59.7 per 10,000 population.
Our Justice Services continue to have a positive impact on the local community through
the Community Payback Order (CPO) unpaid work scheme. For the tenth year we have
continuously over-achieved against targets for CPO level 1 and level 2. 2022-23 saw 116
93

Page 94

28 
out of 117 level 1 CPO’s completing within timescales and 129 out of 135 level 2 CPO’s
completing within timescales. The targets set for unpaid work are pan-Ayrshire targets. 
Drug Treatment and Testing Order 
The graph below provides an illustration of Drug Treatment and Testing Order (DTTO)
assessments and impositions from 2015 until 2023. Assessments requested were at their
highest from 2017-2019, at 62 annually. A slight decrease was noted in 2020, however
once again this number rose again the following year. We have recently noted an
increase of assessment requests for individuals who are remanded in custody, which has
proved to be challenging for DTTO staff in gauging intrinsic motivation to change. 
There is a high correlation between the number of assessments submitted and DTTO’s
imposed and notably 100% of assessments considered to be suitable resulted in a
DTTO. 
Partnership working across Ayrshire with NHS Addiction Services continues to be
extremely effective and local implementation of the MAT (Medically Assisted treatment)
Standards is encouraging service user stability at earlier stages on the Order.
94

Page 95

29 
Diversion from Prosecution
Diversion from Prosecution (Diversion) has been available since 1997, initially
assessed and delivered by Justice Services within each locality. However, referrals from
the Procurator Fiscals (PF) were low and it was agreed to develop a more structured
service across the Partnership to coordinate more directly with the Crown Service. Since
the integration, referrals have increased significantly, particularly in the past two years
with a drive to increase Diversion nationally and in response to specific Justice outcomes
in the updated national alcohol and drug policy ‘Rights, Respect and Recovery’.
The numbers of PF assessments requested in 2022-23 has risen by 110% from 2017-18,
which has resulted in an overall 68% rise in the number of Diversions imposed for
allocation since 2017-18. The continuous increase in Diversion numbers is significantly
impacting on current staff capacity. In the past, Diversion would last approx. 6 - 8 weeks
and generally be for first offences, so that the intervention would be offence focussed,
whereas recently a change in PF referral criteria places the focus on less serious
offences rather than whether it is a first offence, so that many cases presenting in the
past year have had a longer offending history and more complex needs. This is resulting
in both a longer period of intervention and more time spent in providing support for a
range of difficulties and accessing relevant support services. A continued increase in
successful completions demonstrated that the service and staff have adapted to these
challenges and are achieving positive outcomes. 
95

Page 96

30 
Key Performance Indicators
MHO Service
Mental
Health (Care
and
Treatments)
2003
2014
– 15
2015
– 16
2016
– 17
2017
– 18
2018
– 19
2019
– 20
2020
– 21 2021 - 22 2022-23
Emergency
Detentions 29 24 44 44 54 54 81
There have
been a total of
96 requests
92
Short Term
Detentions 72 75 87 69 74 67 134
There have
been a total of
171 requests
(of which
consent was
given to 134,
with the other
37 being
assessed but
consent not
given)
There have
been a total of
127 requests
(of which
consent was
given to 108,
with the other
19 being
assessed but
consent not
given)
Compulsory
Treatment 40 54 25 52 38 51 59
There have
been a total of
70 new CTOs
granted (of
which 27 had
been Interim
CTOs, with 14
of these
moving to full
CTO following
a further
Mental Health
Tribunal)
There have
been a total of
60 new CTOs
granted (of
which 17 had
been Interim
CTOs, with 12
of these
moving to full
CTO following
a further
Mental Health
Tribunal)
Warrants
Undertaken 1 3 1 2 1 6 6 4 4 
96

Page 97

31 
Criminal Justice
Act Scotland 1995
2014
– 15
2015
– 16
2016
– 17
2017
– 18
2018
– 19
2019
– 20
2020
– 21
2021
– 22
2022-
23
Compulsion Order
and Restriction
Order
4 4 4 4 4 3 3 2 0
Compulsion Orders 4 6 5 6 2 6 6 3 3
Hospital Directions 1 1 1 1 1 1 1 0 0
Assessment Orders 1 2 2 2 2 2 2 6 5
Treatment Orders 1 1 2 2 4 2 2 6 2
Transfer for
Treatment  0 3 3 3 2 1 3 1 1 
Adults with
Incapacity Act
(Scotland) 2000
2014
– 15
2015
– 16
2016 –
17
2017
– 18
2018
– 19
2019
– 20
2020
– 21
2021
– 22
2022-
23
Private Welfare
Guardianships 291 255
(60)
287
(67)
367
(92
new)
411
(58
new)
272
(67
new)
314
(57
new)
402
(102
new)
371
(99
new)
CSWO
Guardianships  47 59
(19) 52 (21) 46 (8
new)
40
(16
new)
64
(24)
71
(24)
91
(26)
85
(27
new)
Financial
Intervention Order
(LAG)
58 53
41 & 21
in
process
57 26 31     n/a
MHO Report PWG
Application  86 68 96 100 38 104 75 156 139 
Adult Protection  
2015
– 16
2016
– 17
2017
– 18
2018 –
19
2019
– 20
2020 –
21
2021
– 22
2022-
23
ASP Referrals
(AP1) 697 654 512 457 568 558 643 722
ASP Investigations
(AP2) 91 65 53 88 108 132 102 72
ASP Case
Conferences  73 48 40 47 66 64 40 41
Protection Orders 6 4 4 1 0 3 1 0
Adult Concern
Reports  1349 1446 1609 1838 2335 2215 2070 2370 
97

Page 98

32 
3. Resources 
3.1 Financial Pressures 
The Scottish Government published an updated Medium-Term Financial Strategy
(MTFS) in May 2022 which covers the period to 2026-27. It compares the funding and
spending scenarios to assess the scale of the challenge. It was published alongside the
Resource Spending Review for the same time period.  The role of the MTFS is to set
out Scotland's fiscal outlook over the coming years, including financial opportunities and
risks that may impact on the fiscal position. In line with the recommendations of the
Budget Process Review Group, the document does not set out new spending plans or
explain how prioritisation decisions will be made to meet policy objectives. These
decisions are made in the Scottish Government budget.
Three factors determine the available funding for the Scottish Budget:
• UK Government spending decisions: through the Barnett formula, the change in
the Scottish Government’s Block Grant each year is determined by the change in
the UK Government’s spending on areas devolved to the Scottish Parliament.
• Relative growth in Scottish Government and UK Government devolved tax
revenues: under the Fiscal Framework, if Scottish devolved tax revenue per
person grows relatively faster than in the rest of the UK, the Scottish Budget is
better off and vice versa. This means that Scotland’s budget is influenced not
only by tax policy and economic performance in Scotland, but also by tax policy
and economic performance in the rest of the UK.
• Relative growth in Scottish and UK social security expenditure: under the Fiscal
Framework, if Scottish devolved social security expenditure grows relatively
faster than in the UK, the Scottish Budget is worse off. If UK expenditure grows
relatively faster, additional funds are available within the Scottish Budget. Again,
this means that Scotland’s budget is influenced not only by policy changes within
Scotland, but also what happens in the rest of the UK 
The MTFS notes that the funding available to Scottish Government is expected to grow
steadily (by 14%) over the next four years to 2026-27, with slightly higher growth from
2025-26. In real terms the growth would only be 5% due to the effect of inflation.
However, much of the growth relates to the Social Security block grant, driven by
increased demand. Excluding this implies real terms growth of only 2% across the
whole four-year period.
The Scottish Government MTFS models three scenarios (a central resource funding
outlook and an upside and downside scenario, indicating plausible alternative funding
paths) and outlines the immediate and longer-term pressures on public spending which
need to be considered when developing spending plans to ensure that they meet the
needs of a changing population and build resilience for the future
98

Page 99

33 
The Resource Spending Review, which was published at the same time, sets out the
multi-year portfolio spending envelopes.  The risks to the resource spending outlook
include the following:
• Spending pressure from increased demand from an aging population
• Demand-led nature of social security expenditure
• Public sector pay
• Inflationary pressures
From 2016-17 to 2022-23 the Health and Social Care Portfolio has risen by £5bn and by
the end of the spending review period in 2026-27 the total rise will have been £6.9bn.
The RSR also outlines the underlying growth in the size and cost of the public sector
workforce, even since before Covid. Some of it relates to the devolution of new
functions, but the RSR notes that the growth is not sustainable. The approach from
2023-24 onwards will be to contain the total cost of the public sector pay bill at 2022-23
levels – so increasing salary costs will need to be balanced by reductions in workforce
numbers.
The Scottish Budget for 2023-24 highlighted:
• Investment of over £1.7 billion in social care and integration and lays the
groundwork for the introduction of the National Care Service.
• The National Mission on drugs is supported by increased investment to £160
million, to reduce the avoidable harms associated with drugs and alcohol.
• Investment of £290.2 million over the coming year to tackle CAMHS and
psychological therapies, waiting times backlogs, and deliver improved community-
based mental health and wellbeing support for children, young people and adults. 
3.2 Financial Performance
Financial information is part of the performance management framework with regular
reporting of financial performance to the IJB. This included an integrated approach to
financial monitoring, reporting on progress with savings delivery, financial risks and any
variations and changes to the delegated budget.  There were significant financial
challenges during the period due to the impact of the pandemic.  This resulted in
additional costs being incurred, fluctuating service levels and partial non-delivery of the
transformation programme and associated savings.  
From month 4 the projected position for 2022-23 was an underspend. This demonstrates
the continued focus on the financial position, tight financial controls, planned progress
with savings delivery in many areas, and the focus on ensuring that the pandemic
impacts were captured and funded appropriately.
From the outset of the pandemic the IJB acted very swiftly to respond and developed a
mobilisation plan detailing the additional activities to support our response, alongside the
estimated financial impact.  Financial returns were submitted to the Scottish Government
99

Page 100

34 
on a regular basis, on the premise that any additional costs aligned to mobilisation plans
would be fully funded. Funding was provided by Scottish Government in advance of the
2022-23 financial year to cover Covid-related costs in delegated services and surplus
funding was recovered later in the year. It is not currently anticipated that any additional
funding will be made available in 2023-24 for this purpose.
The overall financial performance against budget for the financial period 2022-23 (after
adjusting for new earmarked reserves) was an overall underspend of £3.719m.  This
consisted of £3.170m of underspend in social care services and £0.549m underspend in
health services.  
This position includes the budget being held on behalf of the IJB by the Council for debt
repayment.   This £2.321m was allocated at the period-end which completely cleared the
outstanding debt to North Ayrshire Council (£1.486m 2021-22).  
2022-23 has been another challenging year for the partnership. Whilst we are optimistic
that we may be over the worst of the direct impact of the pandemic, its long-term impact
is not as well understood. We expect our services to face on-going challenges, including
supporting those who have not been able to access a health and social care professional
due to demands and restrictions, and addressing the rise in poor mental wellbeing in our
communities. 
Our health and social care services should reflect and respond to the needs of local
people. To support this, we will help to build greater capacity in our communities and
provide more ways for service users and local people to share their views with us to help
shape services. We are fully committed to planning and designing services together with
local people, our staff and our key partners including acute health services, housing,
community planning and the third and independent sectors.
Growing evidence suggests that the pandemic has had negative socio-economic effects
that have led to increased health inequalities and contributed to an increase in both poor
mental wellbeing and mental health.
The IJB, through the refreshed Strategic Plan, outlines the belief that together we can
transform health and social care services to achieve the joint vision for the future “all
people who live in North Ayrshire are able to have a safe, healthy and active life.” 
Moving into 2023-24, we are working proactively to address the financial challenges,
while at the same time, providing high-quality and sustainable health and social care
services for the communities in North Ayrshire.
3.3 Medium Term Financial Outlook
A Medium-Term Financial Outlook (MTFO) is a critical part of the strategic planning
process. The financial context for public services remains very challenging and so it is
vital that the IJB’s strategic ambitions are set against the financial resources which are
anticipated to be available.
100

Page 101

35 
The MTFO provides key information on the possible financial position of the IJB over the
next three years (2023-2026). It identifies the financial challenges which will be faced by
the IJB enabling the IJB to see the impact of current and future decisions on its medium-
term financial health.
The MTFO will also be used to identify pressure points and inform decisions which are
required to ensure the Partnership remains financially sustainable.
There are a range of factors which influence the financial planning of the IJB. These are
considered through the MTFO and include the following:
• Demographic changes
• Local priorities
• Workforce challenges
• The UK and Scottish Economy
• Policy and Legislation
• Cost and demand pressures
• Available funding 
Based on the projected budget pressures, three scenarios have been developed which
align to the Scottish Government Medium-term Financial Strategy – best-case, medium-
case and worst-case. In 2023/24, the actual funding levels have been applied across
each of the three, with the possible scenarios applied for 2024/25 and 2025/26.
Against each of the three scenarios, sensitivity analysis has been used to demonstrate
what the impact would be in 2024/25 and 2025/26 if the funding were to increase or
decrease by 5% or 10%.
For 2024-25, the forecast budget gap ranges from a deficit of £1.140m in the best-case
scenario to a shortfall of £5.854m in the medium-case and a shortfall of £11.699m in the
worst-case. These figures are after adjusting for the saving of £1.252m which was
planned on a non-recurring basis for 2023/24 through the use of reserve balances.
For 2025-26, the forecast budget gap ranges from a breakeven position in the best-case
scenario, to a shortfall of £3.876m in the medium-case and a shortfall of £11.031m in the
worst-case.
The MTFO will be revisited ahead of the 2024-25 budget exercise.
4. Workforce 
4.1 Workforce Planning – Staffing and Recruitment Issues
The year past has continued to see the practicalities of the national shortage of qualified
Social Workers take effect in North Ayrshire.  In line with the rest of Scotland we
experience this most acutely within the Children and Families workforce.  Locality teams
have experienced shortages over the year that have been mitigated through careful
deployment of resources in a collegiate way.  The CSWO has a requirement to be
101

Page 102

36 
notified if workforce sufficiency drops below 75%.  This is to ensure proper oversight of
risk management and appropriate professional support is offered to operational
colleagues.
The year past, within a Justice Services context, continued to offer challenges as a result
of changes in the vetting process that is driven by Home Office colleagues in relation to
current and future access to Police systems.  Within North Ayrshire we are appreciative
of the support of local Polce Scotland collegues and have successful co location for a
number of our public protection teams.  We will continue to work closely on this issue to
support safe and timely sharing of information whilst the national picture continues to
emerge.  Reassuringly North Ayrshire Chief Officers Group is sighted on this issue and is
offering support to develop our position.
We have been mindful of our engagement with our practitioners in various forums and
how this links to the Setting the Bar research, highlighting the three key reasons Social
Workers leave the profession are unmanageable workloads, lack of work life balance,
and high administrative workload.  With this in mind, work over the year has been heavily
focussed on the three areas research tells us high performing Social Work agencies do
well:
Caseloads:  The “Setting the Bar” report published by Social Work Scotland makes
reference to well established research which outlines that optimum caseloads for Social
Workers in Children and Families should be 12 and in Adult Services between 20 and 25. 
The key skill of Social Work professionals requires them to have the time to build
relationships and trust, undertake person-centred assessments, plan for the future and
arrange or provide appropriate support. Excessive workloads make it difficult for case
holding social workers to achieve their best practice and support people effectively in
what are often challenging and complex situations. Work within Children and Families
has been undertaken to scope out what is required to set the bar in North Ayrshire which
has been supported by the Partnership and the impact of this will be reported in next
year’s report.  I anticipate similar work to be forthcoming from Adult Social Work Services
in 2024.
Supervision and Support: The post covid environment continues to see the deployment
of hybrid ways of working.  This brings a range of professional and personal challenges
as public issues enter the private home of practitioners and managers.  As a result we
have reviewed our Supervision practices with clear commitments to move back to
professional supervision and away from the beurocratic casework management
approaches so prevalent.
Professional Development:  In the year past we have taken deliberate decisions to
reshape our strategic approach to the professional development of the workforce.  This
means withdrawal from the Learning Network West on 31st March 2024.  As a result we
have seen our internal resource begin to reshape itself and begin to establish
relationships with universities and colleges.  This encomapsses SVQ, degree level, post
graduate and post qualification contexts.  Alongside this we have been reshaping our
102

Page 103

37 
pathways to Social Work, broadening this offer to all HSCP staff, building capacity in
relationship to sponsored places and also seeking to offer a traineeship option.
Retention:  Professional activity has been heavily focussed on the workstreams above
and the expression of intent that retention and quality of experience are key to stable
workforces.  The work described above and underway in other areas such as SDS and
transitions are designed to reshape how we deliver Social Work with a clear focus on
core values and ethics.  More importantly it has, at its core, a desire to see services
evolve and allow our skilled staff to make more of a difference to people’s lives.
4.2 Workforce Support and Development 
A number of Staff well-being sessions ran during January and February 2023
facilitated by KA Leisure with events taking place at venues across North Ayrshire.
Activities included:
• Stress Less sessions
• Menopause Awareness sessions
• Mental Health sessions
• Weight Management sessions
• Standing/Chair Yoga
• Keep Fit Low
• Standing Pilates
• Dance Taster sessions
• Gentle Movement
• Gym Induction sessions
• Signposting
• Free health checks on the Activator Bus 
The new Staff Wellbeing Centre at Ayrshire Central Hospital officially opened on 29
September 2022. The centre makes up part of the existing building for the Gallery Dining
Room at Ayrshire Central Hospital and is a
place for all health and social care staff to
take a much-needed pause and relax. The
staff wellbeing centre is now available as a
rest and sanctuary area and is available for
all clinical and non-clinical staff from across
our entire health and social care system.
The area will be a quiet space separate
from patients and the public.
North Ayrshire have achieved Carer Positive Employer – Exemplary Level, with the
award presented on the 29th of March 2023. Well done to all involved and thank you to
the hard work of Kerryanne Owens, Kimberley Mroz and her team. The award
demonstrates the support the Council provides for its employees who are working carers,
through a combination of practical support and policy, awareness raising and training and
103

Page 104

38 
an active Carers Network. Carer Positive is operated by Carers Scotland on behalf of the
Scottish Government. The Carer Positive commitments recognise those employers who
offer the best support to carers, allowing them the flexibility they may need to deliver
caring responsibilities. The ‘Exemplary’ Level 3 Award is the highest accolade given to
organisations who go above and beyond in their caring commitments to colleagues and
who demonstrate innovative and creative approaches to supporting and involving carers
across their organisation.
The Arran workforce has been developed to provide solutions to service delivery
issues. In 2022/23 a new Health Care Support Worker (HCSW) was appointed to support
our multi-disciplinary team. A new nurse practitioner will provide care to people needing
urgent and unscheduled care, while there is also a new Grade 4 entry level post for the
residential/nursing home. Work has started to develop a new model of working for Arran
AHP team (Occupational Therapy and Physiotherapy team). 
In addition, several wellbeing days have been held at Arran Outdoor centre for all health
and social care staff on Arran, as well as providing access to wellbeing vouchers for
holistic range of practitioners and interventions. A jointly delivered (with mainland
colleagues), online mindfulness group has reconvened, post-COVID – offering the
opportunity for joint working between Occupational therapy and Psychology. 
Enhanced Learning and Development Support for Care at Home saw engagement
take place across 2022/2023 with a range of Care at home teams to discuss the training
plan and consider the training which will be required for each role within the service and
to meet Scottish Social Services Council (SSSC) registration conditions. A 5-year training
plan has been devised for a
• Care at Home Assistant
• Senior Care at Home Assistant
• Care at Home Manager
• Team Manager 
There have also been new training courses devised which were bespoke to the Care at
Home Service.
Practice Reflective Improvement (PRI) Dialogue sessions encourages greater levels
of reflection on cases with an element of child protection.
North Ayrshire Child Protection Committee and North Ayrshire Health & Social Care
Partnership continue to accept referrals for Practice Reflective Improvement Dialogue
sessions. PRI Dialogue has been in place for over a year now and feedback from both
participants and facilitators is showing the value of these sessions: 
“It is really helpful to hear reflections from different perspectives – it makes it easier to
understand the context of decision making and broadens ideas extrapolated from
reflection” (Participant)
104

Page 105

39 
“It (PRI) validated the great work being done and the care and love practitioners have for
their jobs and the children and families they work with. It showed that everyone believes
in aiming for the best outcomes for young people. It also gave people permission to
evaluate their own practice and talk about it openly. The difference it made was, there
were no judgements made on the choices taken. It allowed people to see the different
ways services work and raised the levels of mutual respect for the work we all do.”
(Facilitator)
105

Page 106

40 
Independent Care Providers who provide care services on our behalf 
Where we commission care and support from independent and 3rd sector Providers services based within the North Ayrshire area,
we monitor these services via the Contract Management Framework. The Framework focusses on ensuring a joint approach to
evaluating the quality of care and where appropriate provides an approach to supporting Providers to progress improvements. We
use a range of methods to monitor performance, including: 
• Formal Contract Management meetings on a 6 monthly basis and an Annual Joint Evaluation of Contract to ensure that services
are safe, effective and most of all, that they meet people’s needs
• Review of compliments, complaints and feedback from staff, carers and people who use services
• Information that we collect, before visits, from the provider or from our records
• Local and national information, for example, Care Inspectorate reports
• Visits to providers, including observing care and support and looking at records and documents 
The information below represents how those service which are registered with Care Inspectorate and are based in North Ayrshire
are currently performing.
Registered Services – Minimum Grades across all themes – 
Care Service Subtype
2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Adoption Service Not applicable 0 0 0 1 0 1
Adult Placement Service Not applicable 0 0 0 2 0 2
Care Home Service Older People 1 8 6 2 0 17
Care Home Service Children & Young
People 0 2 4 4 2 12
106

Page 107

41 
Care Service Subtype
2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Care Home Service Children & Young
People 0 1 2 0 0 3
Care Home Service Mental Health
Problems 0 1 0 0 0 1
Care Home Service Respite Care and
Short Breaks 0 0 2 0 0 2
Child Minding Not applicable 0 9 61 52 3 125
Day Care of Children Not applicable 1 5 42 17 0 65
Fostering Service Not applicable 0 0 1 0 0 1
Housing Support Service Not applicable 0 1 6 7 2 16
School Care
Accommodation Service
Not applicable 0 0 1 6 0 7
Support Service Care at Home 0 1 12 9 0 22
Support Service Other than Care at
home 0 0 7 0 1 8
Grand Total Not applicable 2 28 144 100 8 282 
107

Page 108

42 
Inspection of Local Services   
Our Children and Families Service were subject to a Joint Inspection of Services for
Children and Young People at Risk of Harm in North Ayrshire which was published
on the Care Inspectorate website here - Report of a joint inspection of services.        
In support to the inspection, please find a link to a video the Young Inspection
Volunteers have produced for children, young people, and their Families – YouTube
video
It is a very positive report for children’s services and one we can be proud of. The
report recognises the very strong evidence of partnership working and the clear
commitment and dedication of staff working across various agencies to reduce risk
of harm, develop positive relationships and improve wellbeing outcomes for our
children and young people. 
The report also references the wide range of innovative work the partnership has
driven forward, our strong leadership and coherent and shared vision to make
positive change. In particular, the report highlights the swift, collaborative, strategic
and deliberate action we took to protect children and young people from harm during
the pandemic.  
Overall, the key strengths highlighted in the report as follows:
• Recognition and initial response to risk and concern to children was a
strength. Staff took timely and appropriate action to keep children safe. 
• Overall, key processes for assessing and managing risk for children at risk
of harm were well established and working effectively. 
• Effective oversight and scrutiny of child protection performance was
provided by the Chief Officers Group and Child Protection Committee. 
• Partners had a well-established approach to gathering and using
performance data to inform and support improvement activity.
The report outlined there were two areas for further improvement: 
• The partnership should further develop its review of outcome data to
demonstrate the difference services are making in keeping children safe. 
• Continued attention was needed to ensure all children and young people
are meaningfully involved in decisions about their lives and in the
development of future service provision.
The Partnership also received 7 further inspections; 2 announced and 5
unannounced. The inspection reports for these can be found - Inspection Reports.
108

Page 109

43 
Inspection Date Service
Number Service/Unit Wellbeing Leadership Staffing Environment Care &
Support
11 - May - 22 CS2007142325 The Meadows 3 0 0 0 0
01 - June - 22 CS2008192560 3T, NC &
Arran CAH 5 0 0 0 5*
01 - June - 22 CS2008192553 Irvine, GV &
CA 5 0 0 0 5*
21- July - 22 CS2003001160 Canmore 4 0 0 0 0
25 - July - 22 CS2003001167 Montrose
House 3 3 3 4 3
16 - February - 23 CS2008177877 Anam Cara 5 5 0 0 0
27 - February -23 CS2007142322 Achnamara 4 0 0 0 0
*Within Care and Support, Inspections for Three Towns, North Coast and Arran as well as Irvine, Garnock Valley and
Community Alarm were graded relating to how good is our care and support during the COVID-19 pandemic.
This was introduced as an additional key question to the Quality framework during the COVID-19 pandemic by the Care
Inspectorate. 
The Care Inspectorate use a six-point scale to grade inspections:
1 Unsatisfactory Major weaknesses – urgent remedial action required
2 Weak Important weaknesses – priority action required
3 Adequate Strengths just outweigh weaknesses
4 Good Important strengths, with some areas for improvement
5 Very Good Major strengths
6 Excellent Outstanding or sector leading
109

Page 110

110

Page 111

NORTH AYRSHIRE COUNCIL 
26 September 2023 
Cabinet
Title: Lease Disposal – Additional area at Nethermiln Playing
Fields, West Kilbride
Purpose: To seek Cabinet approval to provide a lease of the Football Pitch
at Kirkton Glen & Nethermiln Playing Fields, West Kilbride to West
Kilbride Community Sports Club.
Recommendation: That Cabinet approve the lease disposal of the Football Pitch at
Kirkton Glen & Nethermiln Playing Fields to West Kilbride
Community Sports Club for a period of 25 years with an option to
extend for a further 25 years at a nominal rent of £1 per annum,
exclusive of VAT. 
1. Executive Summary 
1.1 West Kilbride Community Sports Club has the long-term ambition of fully redeveloping
the sports facilities within Kirkton Glen, with the proposal being to undertake this on a
phased basis. Prior to the previous 2014 Cabinet approval of this proposal, a full
feasibility study and business plan was prepared, and planning consent was granted in
respect of the complete redevelopment proposal in 2013. 
1.2 Following completion of the lease of the Tennis Courts in 2015 and the Playing Fields in
2018, this report is seeking Cabinet approval to grant a lease to West Kilbride Community
Sports Club of the Football Pitch (Area 2) as identified within Appendix 1. 
1.3 Having undertaken initial negotiations with West Kilbride Community Sports
Club, it is recommended that Cabinet grants a lease, the terms of which have
been agreed in principle, for a period of 25 years with an option to extend for a
further 25 years at a discounted rent of £1 per annum, exclusive of VAT. 
2. Background 
2.1  West Kilbride Community Sports Club has the long-term ambition of fully redeveloping
the sports facilities within Kirkton Glen. Cabinet approved a proposal in 2014 to grant a
lease of the Tennis Courts (Area 1) and a call up option for the additional areas sought
as shown in Appendix 1. The lease of the tennis courts concluded following the 2014
Cabinet approval. In 2018 further leases of the Playing Fields (Area 3) and the Pavilion
were granted at a nominal rent. 
2.2 In February 2023 West Kilbride Community Sports Club requested a further lease of
the football pitch as they are seeking to progress funding bid(s) to develop a synthetic
pitch on the existing pitch. Earlier this year, Cabinet approved a Community Investment
Fund application for West Kilbride Community Sports Club and Friends of Kirktonhall
Glen to employ a specialist consultant to help pursue the additional funding required for
the project. The lease proposed is a 25 year long term with an option of a further 25
years at a rent of £1 per annum.
Agenda Item 5
111

Page 112

2.3 The ground lease will grant the tenant a right to use the ground for the purpose of
sporting activities and any further development of the land would require consent from
the Council as landlord. 
2.4 While there is no need for this lease to follow the asset transfer process due to the
previously approved call up option, this lease remains in the spirit of providing
opportunities for people to be involved in developing and providing opportunities or
services for their local communities, using public assets more frequently and
effectively, and allowing groups to  secure extra funding or resources which are the
underpinning principles of asset transfer within the Community Empowerment
(Scotland) Act 2015. 
3. Proposals 
3.1 It is recommended that Cabinet approve the lease disposal of the Football Pitch at
Kirkton Glen & Nethermiln Playing Fields to West Kilbride Community Sports Club for a
period of 25 years with an option to extend for a further 25 years at a nominal rent of £1
per annum, exclusive of VAT. This would be in line with the spirit of the Cabinet
approval in 2014. 
3.2 The previously approved call up option (see paragraph 2.1) would also be concluded in
conjunction with this lease agreement. This would enable the group to add Area 4,
Area 5 and Area 6 as noted in Appendix 1, to the proposed lease at no additional
charge. The inclusion of the call up option would protect these areas from alternative
uses/interest to enable West Kilbride Community Sports Club to further expand their
operation when it is financially viable for them to do so. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications as a result of this report as the lease is offered on a
de-minimis terms. 
Human Resources 
4.2 None. 
Legal 
4.3 If the report is approved, the legal documentation will be progressed via Legal
Services and the Council will lease the land to the West Kilbride Community Sports
Club. 
Equality/Socio-economic 
4.4 If the report is approved, West Kilbride Community Sports Club will be able to further
develop the social benefits delivered on the site. 
Climate Change and Carbon 
4.5 None. 
112

Page 113

Key Priorities 
4.6 If the report is approved, the further development of the area by the West Kilbride
Community Sports Club will support the Council plan priorities of: 
• Providing support for community organisations and supporting community
operated assets.
• Using our assets to support wellbeing in local communities. 
Community Wealth Building 
4.7 If the report is approved, West Kilbride Community Sports Club aims to contribute to
Community Wealth Building by the development of underutilised assets for community
use. 
5. Consultation 
5.1 Legals Services and Connected Communities have been consulted on the content of
the report. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact David W. Hammond, Head of Sustainability,
Corporate Property & Transport on 01294 324514. 
Background Papers
Cabinet Report – Kirkton Glen Pavilion and Nethermiln Playing Fields and Tennis Courts,
West Kilbride, 16 December 2014 
1 – Appendix 1
113

Page 114

North Ayrshire Council
Comhairle S'orrachd Air a Tuath
Sports Site, Kirkton Glen, West Kilbride
© Crown copyright and database rights 2014 Ordnance Survey 100023393
ESTATES SECTION
Sustainability, Corporate Property & Transport
North Ayrshire Council
Cunninghame House, Irvine, KA12 8EE
Appendix 1
114

Page 115

NORTH AYRSHIRE COUNCIL
26 September 2023
Cabinet
Title: North Ayrshire Asset Management Strategy & Plans
Purpose: To seek Cabinet approval of the refreshed North Ayrshire
Corporate Asset Strategy and associated Asset Management
Plans.
Recommendation: That Cabinet approves the North Ayrshire Corporate Asset
Strategy and Plans at Appendix 1.
1. Executive Summary
1.1 The Council has a variety of assets which are integral to service delivery. Asset
management is a structured and systematic approach to managing assets on an
ongoing basis. This approach addresses all phases of an asset's life cycle, from pre-
acquisition through to end of life.
1.2 This report introduces a new Corporate Asset Strategy incorporating individual Fleet,
Roads, Housing, Property, Open Space and ICT asset management plans. The review
has been informed by various key drivers including the North Ayrshire Council Plan,
our Community Wealth Building approach, climate change emergency and the ongoing
financial challenges facing the public sector.
1.3 Key areas of asset management opportunity will include how we maximise the use of
our land and property assets and how we can manage assets in such a way to
contribute to our Council Plan priorities of wellbeing, tackling climate change, and
supporting communities and local democracy, for example by investing in energy
efficiency measures and decarbonisation of buildings and fleet, or supporting
communities to acquire buildings through Community Asset Transfer.
1.4 Robust asset management also plays a key role in developing the Council’s Medium
Term Financial Strategy through the realisation of efficiencies and enhanced utilisation
of assets. The plans are also an integral delivery mechanism to ensure the Council
delivers ‘Best Value’. The proposed Corporate Asset Strategy and Plans at Appendix 1
reflect updated priorities and challenges to ensure an approach to asset management
that remains fit for purpose.
2. Background
2.1 The Local Government (Scotland) Act 2003 places a duty on local authorities to
demonstrate ‘Best Value’ in delivering their services and in managing any assets they
hold. Typically, individual councils hold assets worth millions of pounds and it is in the
interest of councils and their communities to ensure that the most effective use of these
assets is being made.
2.2 Asset management plans are essentially a decision-making framework used to identify
assets, their value, their use and how they support the Council’s overall aims and
Agenda Item 6
115

Page 116

objectives. Asset management plans are therefore also important tools to assist in the
planning of capital and revenue expenditure.
2.3 More widely, there is a need for our asset management approach to align closely with
the North Ayrshire Council Plan, reflecting the strategic priorities of wellbeing,
communities and local democracy and climate change. In addition, a key objective of
Community Wealth Building is maximising the use and function of our land and
property assets for the benefit of local people. This includes exploring alternative use of
council owned assets for communities or businesses and supporting Community Asset
Transfer to grow community ownership.
2.4 The landscape in which Council services are delivered is constantly changing, with
direct impacts on how assets are used and managed. The shift to more agile working
patterns has changed how our buildings are used, and the development of several
school campus projects in recent years has provided opportunities for community
services to be co-located.
2.5 The current economic climate has significantly increased the operating and
maintenance costs of our asset portfolio and placed a renewed focus on the
sustainability of assets going forward.
2.6 The climate change emergency has far-reaching implications for our assets: the
decarbonisation of buildings and vehicles, infrastructure requirements for active
travel, opportunities to use our assets for renewable energy generation, and
protecting and enhancing our habitats to capture carbon.
2.7 The overall aims and objectives of our refreshed CAS are:
1. That our asset management approach is aligned to the delivery of key Council
and partner strategies, including the North Ayrshire Council Plan;
2. That we maximise the efficient and effective use of all Council assets for the
benefit of those that live, work, visit or do business in North Ayrshire as part of a
clear and co-ordinated framework;
3. That, through our sustainable change programme, we review our assets to
ensure that the portfolio is lean and fit-for-purpose and that opportunities to
reduce pressure on capital and revenue budgets are identified and delivered;
and
4. That available investment in assets is prioritised, with clear governance,
assessment and decision-making arrangements in place.
2.8 Audit Scotland published the latest Best Value Assurance Report for North Ayrshire
Council in June 2020. A key area of focus for the audit was how the Council manages
its assets. The report noted that the Council has demonstrated a culture of continuous
improvement since a previous report by the Accounts Commission in 2011. Central
to the approach is sound governance arrangements for asset management, and the
proposed CAS at Appendix 1 sets out the roles and responsibilities, prioritisation and
decision making criteria for our assets.
2.9 The refreshed CAS also provides the framework for performance and risk
management and reporting as part of our asset management approach.
2.10 The CAS includes individual asset management plans for the six categories of asset:
property, housing, roads, fleet, open space and ICT. Each individual asset plan aims
to ensure that the Council holds the right assets and that they are fit for purpose in
terms of condition, suitability, sufficiency and accessibility. The asset plans, including
condition survey information, are used to inform the capital investment programme.
3. Proposals
116

Page 117

3.1 It is proposed that Cabinet approves the refreshed Corporate Asset Strategy and Plans
at Appendix 1.
4. Implications/Socio-economic Duty
Financial
4.1 Implementation of the asset management plans associated with this report will be funded
through existing resources. Robust asset management planning allows the Council to
maximise the benefit from investment.
Human Resources
4.2 The asset management plans will be delivered from within existing resources.
Legal
4.3 These plans set the overall strategy for the Council’s assets. Individual assets (such
as those held by the Common Goods or Trusts) or particular proposals (such as sale
or asset transfer of assets) are subject to specific legal requirements. However,
overarching all is the duty on the Council to demonstrate Best Value in the use of its
assets and resources.
Equality/Socio-economic
4.4 Implementation of the asset management plans underpins the Council’s equality and
socio-economic duty, by, for example:
• Ensuring availability of affordable, accessible, well-maintained housing
• Ensuring access to public services through availability of well-maintained property
assets including schools, libraries and community centres
• Availability of quality public open spaces, for physical activity and health and
wellbeing benefits
Climate Change and Carbon
4.5 The Council’s asset management plans recognise the opportunities to tackle climate
change through efficient asset management, for example: investment in energy
conservation measures in our houses and non-domestic buildings; using our assets to
generate renewable energy; continued decarbonisation of our vehicle fleet;
construction of new electric vehicle charging points; and journey reduction through the
use of technology.
Key Priorities
4.6 The asset management plans are designed to support our Council Plan priorities by
setting out a framework for utilisation and management of assets that supports a
wellbeing economy, responds to the climate change emergency, and provides
opportunities for local decision making.
Community Wealth Building
4.7 Implementation and continued development of the asset management plans will
contribute to all strands of Community Wealth Building, in particular the utilisation of
117

Page 118

our land and assets. 
5. Consultation 
5.1 A cross-service officer working group was established to review and refresh the
approach to asset management and to ensure a consistency of approach in preparing
the individual asset management plans. The asset management plans have been
developed in consultation with partners and customers where appropriate. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact David W. Hammond, Head of Service
(Sustainability, Corporate Property & Transport), on 01294 324514. 
Background Papers
0
118

Page 119

APPENDIX 1 
NORTH AYRSHIRE COUNCIL 
CORPORATE ASSET MANAGEMENT STRATEGY & PLANS
2023-28 
119

Page 120

1. Introduction
The Council has a variety of assets which are integral to service delivery. Asset
management is a structured and systematic approach to managing assets on an
ongoing basis. This approach addresses all phases of an asset's life cycle, from pre-
acquisition through to end of life. Effective asset management planning means knowing
what you own, where it is located, who is responsible for it, the operation and
maintenance costs, and what role the asset has in current and future service delivery.
As part of the asset management process, we need to ensure that assets are:
• fit for purpose
• used efficiently
• maintained on a sustainable basis
• matched in investment terms to service needs. 
This Corporate Asset Strategy (CAS) sets out a framework for the management of the
Council’s core assets and infrastructure, with individual, detailed asset management
plans for the Council’s key asset groups as appendices to the document. 
2. Aims & Objectives
Plans for the future should ensure that assets are used primarily to enable the most
effective provision of services together with the achievement of strategic objectives; and
that this should be done in the most efficient manner. The CAS aims to provide an
integrated approach to realising the Council’s overall strategic aims and objectives for
optimising assets.
The North Ayrshire Partnership Plan (NAPP) (formerly the Local Outcomes
Improvement Plan) is administered by the North Ayrshire Community Planning
Partnership and consists of public, private and voluntary organisations and groups
working together with communities through our six Locality Partnerships to make North
Ayrshire a better place to live. The NAPP has three key themes: Wellbeing, Work and
World.
Alongside the wider NAPP, the CAS and individual asset management plans play a
central role in delivery of the most recent Council Plan. The latest review of the CAS and
plans therefore reflects the following Council Plan priorities:
• Wellbeing
• Communities and Local Democracy
• Climate Change
• A Sustainable Council
Alongside delivery of day-to-day services, there are also a wide range of overarching
Council strategies where delivery is contingent on the effective use of assets, for
example:
120

Page 121

• Community Wealth Building Strategy
• Environmental Sustainability & Climate Change Strategy
• Local Housing Strategy
• Regeneration Delivery Plan
• Open Space Strategy
• Learning Estate Strategy
• Digital Strategy
• Technology Strategy
• Sustainable Change Programme
It is within this context that the aims and objectives of the CAS are set. These are:
1. That our asset management approach is aligned to the delivery of key Council
and partner strategies, including the North Ayrshire Partnership Plan and Council
Plan
2. That we maximise the efficient and effective use of all Council assets for the
benefit of those that live, work, visit or do business in North Ayrshire as part of a
clear and coordinated framework
3. That, through our sustainable change programme, we review our assets to
ensure that the portfolio is lean and fit-for-purpose and that opportunities to
reduce pressure on capital and revenue budgets are identified and delivered
4. That available investment in assets is prioritised, with clear governance,
assessment and decision-making arrangements in place
3. Drivers for Change
The landscape in which Council services are delivered is constantly changing, with direct
impacts on how assets are used and managed.
The shift to more agile working patterns has changed how our buildings are used, and
the development of several school campus projects in recent years has provided
opportunities for community services to be co-located.
The cost-of-living crisis has significantly increased the operating and maintenance costs
of our asset portfolio and placed a renewed focus on the sustainability of assets going
forward.
The climate change emergency has far-reaching implications for our assets: the
decarbonisation of buildings and vehicles, infrastructure requirements for active travel,
opportunities to use our assets for renewable energy generation, and protecting and
enhancing our habitats to capture carbon.
The Council are pioneers in Community Wealth Building (CWB) and launched
Scotland’s first Community Wealth Building Strategy in May 2020. CWB aims to retain
wealth and economic benefits within the local area, making our communities more
121

Page 122

inclusive, resilient and sustainable. A key objective of CWB is maximising the use and
function of our land and property assets for the benefit of local people. This includes
exploring alternative use of council owned assets for communities or businesses and
supporting Community Asset Transfer to grow community ownership.
The Council’s capital and revenue budgets continue to face significant pressure,
compounded by recent inflation and borrowing cost rises. There are less and less
resources available to meet the investment, operating and maintenance requirements
of our asset estate.
122

Page 123

7
4. GOVERNANCE
The diagram below provides the governance arrangements for corporate asset
management within the Council:
123

Page 124

3.1 Roles and Responsibilities
Audit Scotland published the latest Best Value Assurance Report for North Ayrshire
Council in June 2020. A key area of focus for the audit was how the Council manages
its assets. The report noted that the Council has demonstrated a culture of continuous
improvement since a previous report by the Accounts Commission in 2011. Central to
the approach is sound governance arrangements for asset management.
Cabinet approves the corporate framework and the medium and longer term
investment programme.
The Executive Leadership Team, the Capital Programme and Assets Group (CPAG)
and Directorate & Service Project Boards ensure officer co-ordination of corporate
asset management and support the Council and Cabinet at chief officer and senior
management levels.
CPAG is chaired by the Head of Finance, with representation from senior officers
across all Services. It meets on a monthly basis with the remit of:
• ensuring a strategic and corporate approach overview of asset management to
ensure the Council’s resources are deployed effectively
• developing and delivering the corporate asset management plans
• developing and delivering the Council’s capital investment programme,
minimising slippage on the delivering the programme
• developing clear criteria for investment of Council resources on asset matters
and assessing all investment business cases
• developing and monitoring performance across all asset classes
• developing a capital receipts strategy
• developing and implementing best practice in all asset matters
Chief Officers and Senior Managers are responsible for:
• working together to ensure a corporate approach to asset management is in place
and delivering the Council’s asset management plans and associated investment
programme
• contributing to the development and delivery of asset strategies and plans; and
• ensuring consultation on asset management is undertaken with all relevant
stakeholders
Directorate and Service Project Boards are responsible for:
• Ensuring capital and asset plans are being implemented efficiently and effectively
• Taking corrective action to ensure delivery plans remain with agreed parameters
of time and budget
• Escalating relevant issues to the Executive Leadership Team and and/or CPAG
3.2 Asset Plans
The Council’s CAS and plans have been reviewed in line with the CIPFA’s ‘A Guide to
Local Authority and Public Sector Asset Management’ published in 2020. Our assets
124

Page 125

are classified under six categories, with an associated plan for each as an appendix to
the CASL
Asset Plan Directorate Chief Officer
Property (including
Common Good assets)
Place Head of Sustainability,
Corporate Property &
Transport
Housing Place Head of Sustainability,
Corporate Property &
Transport/Head of Housing
& Public Protection
ICT Chief Executive’s Head of People & ICT
Roads including
structures, lighting and
water infrastructure
Place Head of Neighbourhood
Services
Open Space Place Head of Neighbourhood
Services
Fleet including vehicles,
plant and equipment
Place Head of Sustainability,
Corporate Property &
Transport
125

Page 126

Each individual asset plan aims to ensure that the Council holds the right assets and that
they are fit for purpose in terms of condition, suitability, sufficiency and accessibility. The
asset plans, including condition survey information, are used to inform the capital
investment programme. 
The asset plans follow a broadly similar structure, setting out the Council’s current
asset base, assessment against the categories within the CIPFA guidance, with an
action plan at the end of each document. 
5. Funding Strategy 
The Council’s 10-year Capital programme is aligned to the strategic priorities as set out 
in the Council Plan and is the product of the various plans and strategies which impact on
the assets and infrastructure of North Ayrshire Council. The plan is updated annually,
with a full refresh undertaken every three years. 
The current 10-year plan includes significant investment in key strategic projects such as
investment in the Councils learning estate (for example Ardrossan Campus and
Montgomerie Park Primary school), and the Ayrshire Growth Deal which will see the
regeneration of the region through investment in strategic infrastructure across various
sectors, including life sciences, tourism, manufacturing and aerospace. 
The Capital investment is funded from a variety of sources including the General Capital
grant, Scottish Government Specific Capital Grants, Ayrshire Growth Deal, capital
receipts and the use of internal funds. However, most of the Council’s funding comes
from Prudential Borrowing. 
The revenue implications of both the individual projects included within the Programme
and the additional borrowing costs associated with the overall programme have been
incorporated within the Medium Term Financial Plan 2023/24 to 2025/26. Any further
revenue implications associated with those projects which are still to be finalised and will
be reported once the detailed business cases have been approved. 
6. Performance 
The Council must underpin asset management, business case development and
capital and revenue decision making with robust asset performance data. The Council’s
Performance Strategy set out our framework for managing and reporting on performance. 
In relation to asset management plans, there are a number of performance indicators as
part of our performance framework that provide intelligence on our asset management
performance
126

Page 127

1 
ASSET MANAGEMENT PLAN 
PROPERTY
127

Page 128

2 
Ensuring that the estate is used as effectively and efficiently as possible.
Overseeing day to day management, including maintaining and repairing existing
properties.
Developing new buildings that are well designed and fully meet service needs.
Identifying and disposing of surplus properties through locality planning with
Directorates.
Capital project delivery.
Effective management of leases and licences.






Our role - In North Ayrshire Council (NAC) our properties, and corresponding budgets, are
managed centrally by the Property Management and Investment division who act as the
“Corporate Landlord”. This enables our resources to be prioritised and directed where
they are most needed and ensures the property portfolio is aligned with the Council’s
strategic objectives. We work with services, partners and elected members to develop
innovative solutions for adapting our non-housing property portfolio to better support the
changing business needs of our services. 
It is our role to manage the Council’s portfolio effectively, providing best value for our
services and the people of North Ayrshire. Managing the portfolio includes: -
1. Introduction 
The Property Asset Management Plan (PAMP) underpins strategic decision making at the
Corporate Landlord level across the Council and is prepared by Property Management &
Investment (PMI). PMI is part of the Place Directorate and responsible for managing the
Council’s housing and non-housing property assets.
The plan covers all the Council’s interests in buildings and its main purpose is to: -
 set out the Council’s objectives, priorities, programme, and performance in relation to
property.
 provide a clear statement of direction for other property stakeholders and customers. 
The PAMP is one of the Council’s principal policy and performance documents which supports
the delivery of the Council Plan. This PAMP is a technical plan to deliver property services
based on the “how”. It is intended to be a clear statement of the strategy to be followed in
making decisions relating to the property resources that support service delivery. Supporting
the PAMP is the Estates Strategy which sets out a high-level overview of the property vision,
objectives, plans, programmes, and projects that are being developed to implement the
strategy. 
This Property Asset Management Plan (PAMP) sets out the North Ayrshire plan for the
management of the Council’s property assets for the period 2023 – 2028. 
2. Aims & Objectives
128

Page 129

3
 Establishing a corporate framework for the management of all Council property
assets.
 Presenting an overview of the extensive property assets owned by the Council.
 Identifying the internal and external influencing factors and challenges affecting
property.
 Identifying a number of activity themes to improve the performance of property asset
management.
 Outlining priorities for investment in the Council’s property estate.
North Ayrshire Council has established the Council Plan 2023-2028 which contains four
principal objectives necessary to meet our vision and mission statements. Effective and
efficient property asset management is pivotal in achieving these goals, with the key activities
noted as follows:
• Wellbeing
• Communities & Local Democracy
• Climate Change
• A Sustainable Council
The purpose of this PAMP is to support the delivery of the Council Plan and to ensure that
property assets continue to play a pro-active role in the delivery of Council services.
This PAMP supports the delivery of the North Ayrshire priorities by:
Property assets are essential to the services delivered by North Ayrshire Council and
managing these property assets is a structured process that seeks to ensure best value;
continuous improvement in performance; achievement of corporate priorities and service
modernisation.
3. General Description of Assets
The following table summarises the Council’s operational properties within North Ayrshire:
Property Type Uniclass Category Number
Historic Buildings D582 14
NAC Offices (inc. leased-in) D3141, D3142, D3143, D3154,
D325 8
Schools (inc. Early Years stand-alone
assets and ASN schools) D711, D712, D713, D717 59
Community Properties D51, D532, D5322, D5323,
D5341, D754, D762 56
Depots D1264, D173, D1732, D2722,
D2823, D284 23
Commercial (inc. individual units) D283, D284, D345, 223
Sheltered Housing/ Day Care Centres D441, D447, D8141, D8144 32
129

Page 130

4
North Ayrshire Leisure Limited D541, D562, D563, D567,
D56771, D5685 18
Cemeteries (inc. graveyards/
churchyards) D673 34
Residential Non-HRA D442, D4461, D855 14
Educational Resource Centres D5841, D586, D74 5
Other Sports & Travellers Site D5845 12
Public Conveniences (exc. APC’s) D941, D942 25
Total Property Assets 523
of which, Common Good 7
Table 1 - Property Asset Designations as at August 2023
4. Asset Management Performance and Drivers for Change
For this PAMP to achieve its objectives, the ambition needs to be accompanied by year-on-
year delivery of significant, meaningful, and measurable benefits to the Council and the
residents of North Ayrshire. The Council needs to be capable of demonstrating these benefits
through its own performance measures and to satisfy both external scrutiny and comparison
against external benchmarks.
The performance challenge for the Council in terms of asset management is captured in the
following chart. It embraces external assessment, to meet statutory performance obligations,
and internal challenge in terms of a performance measurement framework. Put simply, the
approach is to assess how well the Council is doing against a clear set of performance criteria
which reflect Council priorities in terms of efficiency, effectiveness and added value.
PMI will ensure that the structure for and disciplines around Corporate Asset Management
Planning are maintained and refreshed annually.
130

Page 131

5
Data Measures Outcomes
Local Stakeholders
Requirement
Property Performance Challenge
Use of National
property
Management
Performance
Indicators
(NaPPMi)
Developed by NAC
to meet own
specific needs
Performance indicators tailored for different types of property
In relation to key
themes 
Short, medium,
and long term
It is vital to present relevant information in a simple and informative manner to reflect a
property’s performance in supporting service delivery.
The key questions to therefore consider are: -
 What property does the Council have?
 How well is it performing?
 What are the long-term needs?
 How can these be achieved and funded?
In previous years, work has been undertaken to assess the condition and suitability of each
operational property to enable an overall suitability assessment to be undertaken, which in
turn enables informed decisions to be made in relation to future investment requirements.
The latest condition surveys undertaken on key operational properties assessed the condition
of the property assets and highlighted priority investment based upon the design life of
individual elements of the fabric of the property assets. This created a needs-based
prioritisation of investment to inform capital planning.
With regards to key drivers for change, there are a number of emerging constraints which will
impact on the success of the PAMP. These influences include:
 The Council’s commitment to achieve net zero carbon emissions by 2030
Community Surplus Investment Tenanted Office Operational
Optimised
Portfolio
National
Corporate
Objectives Comparisons PAMP
Performance Indicators Theme Platform
Business
Partners
Asset Data
Records
Set and
Monitored by
Strategic
Property Asset
Group
Condition
Cost
Income
Value
Sufficiency
Suitability
User
Utilisation
Sustainability
Accessibility
Efficiency
Effectiveness
Value
Other
Industry
Public Sector
131

Page 132

6 
 Investment in existing building stock is required to upgrade or replace plant with
more energy efficient and green technology from renewable sources, together with
enhancing building fabric and increasing thermal resistances of current property
assets.
 New projects may rely more on external consultants with specialised knowledge
and experience to deliver buildings which meet the credentials necessary to
achieve net zero, such as Passivhaus. 
 Difficulties attributed to the current economic climate
 Financial pressures undoubtedly have an impact on the way the Council operates,
in particular the maintenance of our property assets which are the main base for
operation of most of our services. 
 Post-pandemic work habits have changed, resulting in less demand for office space
 In the post-pandemic world, agile and hybrid working arrangements are now
commonplace. One factor from this change is the reduction in office
accommodation required, with many buildings becoming under-utilised. 
5. Condition and Suitability
A Condition Survey provides an elemental assessment of the physical condition of a property
and provides an assessment of a building’s:
 Current condition
 Costs to bring up to standard
 Future costs
 Recommendations, concerns, further action 
To facilitate an informed decision-making process, a Condition Survey should result in a clear
understanding of the current condition of operating systems by a client. This indicator
measures the percentage of gross internal floor area of operational accommodation which can
be considered as either:
A. Performing well and operating effectively; or
B. Performing adequately but showing minor deterioration; or
C. Showing major defects and or not operating adequately; or
D. Life expired and or at serious risk of imminent failure. 
PMI employs a dedicated officer who is responsible for undertaking full condition surveys of
our operational properties on a 5-year cyclical basis, with these reviewed and refreshed
annually. This ensures we have the most up to date information possible and have extensive
in-house knowledge of our operational property portfolio. 
Building suitability is defined as:
“The extent to which a property meets the current and future needs of, and contributes
toward improvement of, service delivery”.
Suitability assessments have been carried out for some of the Council’s operational properties.
The Statutory Performance Indicator (SPI) on suitability reflects the number of operational
buildings which are considered to be suitable for their current use. These properties fall into
either category A or B. The work to continue to assess the suitability of council assets will
132

Page 133

7 
continue under this PAMP to enable fuller benchmarking of the performance of assets as the
Council continues on property rationalisation programme.
In conjunction with ensuring the property is suitable for its current use, the assessment of the
effective utilisation of the Council’s property assets and resources is fundamental in realising
both the Council’s vision and strategic priorities.
The Council's drive to improve efficiency is a key element of its desire to achieve a retained
estate which meets the needs of service delivery and is fit for purpose. This is an essential
element of good asset management practice by identifying utilisation of property assets, the
Council can map current and plan for future demands for property assets.
A key element of these utilisation reviews is the identification of under-utilised property assets,
which will be examined to determine alternative proposals to either maximise utilisation of the
asset, or to provide the service in a different way, thereby enabling the asset to be declared
surplus and offered for disposal. To date, comprehensive utilisation information has only been
collected for the school estate which indicates that there are no establishments where the
school roll exceeds the building capacity, whilst 22% of primary and secondary schools have
rolls less than 60% of their capacity. It is a key factor in both the setting of the Capital Plan
and the rationalisation of the Council’s estate, that where schools have spare capacity, they
assist with the creation of community hubs within school campuses/premises where feasible.
In order to determine the sufficiency of the estate, and where investment may require to be
targeted, calculations are required to be undertaken which take account of planning
applications for housing and assessments of demographic population forecasts.
6. Sufficiency
The emergence of hybrid working through the need for change during pandemic restrictions,
along with advances in technology has revolutionised the working environment. The effect of
staff working from home has led to a substantial decrease in demand for office
accommodation. This downturn in occupancy for many Council buildings has presented an
opportunity to rationalise the estate by consolidation of services.
There is currently a feasibility study underway to review the corporate buildings and propose
solutions to adjust the portfolio to meet the demands of the workforce. It is anticipated that this
study will identify options to streamline the property assets, making for a more efficient estate
and in turn reducing revenue costs as well as potential disposal opportunities leading to capital
receipts.
Good estate management involves the monitoring and review of the portfolio. Any property
assets which may be deemed Surplus, can be considered for disposal, either by way of sale
or transfer. There are a number of benefits achieved from the disposal of a surplus asset: -
 Revenue savings achieved through the removal of property running costs.
 Capital Receipts income from sale of asset.
 Removal of statutory obligations easing pressure on resources
 Reduction in risk management, where some older properties may have latent defects
(such as asbestos, Legionella or ageing plant at risk of breakdown)
 In the case of Community Asset Transfers, the disposal will empower the community
associations who take over the ownership of the building.
 The opportunity to contribute to the Council’s net-zero carbon emissions target by
offloading buildings which may not be particularly efficient. 
7. Financial
133

Page 134

8
Property Running Costs 22/23
£5,347,000 £5,741,000
£3,424,000
Utilities
Property Maintenance
Property Costs (Rates, Insurance, etc.)
Property Lifecycle Investment Commitments
£3,500,000  
£3,000,000
£2,500,000
£2,000,000
£1,500,000
£1,000,000
£500,000
£0
Budget Actual
The total revenue running costs for the operational estate in 2022/23 was £14.512m, which
consists of all reactive repairs, planned preventative maintenance, statutory compliance,
utilities, rates, insurance premiums, and any other property costs.
Committed revenue investment across the property estate is accompanied by ongoing capital
investment through the Property Lifecycle Investment (PLI) budget. This funding stream
contributes to the maintenance and management of an asset by maximising the life of the
building. Considered investment is directed to properties in need of building fabric upgrade
and plant replacement where required most, and as identified in the cyclical condition surveys.
Since 2016/17, there has been a total investment of £13.583m from PLI funds on operational
buildings, with a further £7.877m anticipated spend by 2030/31.
134

Page 135

9 
As highlighted in Section 6 – Sufficiency, the disposal of surplus assets may lead to the Council
achieving capital receipt income from the sale. The current Capital Receipts Schedule is
summarised as follows: 
Funding 
Actual
2023/24 
Estimated
2023/24 
Estimated
2024/25 
Estimated
2025/26
Estimated
2026 &
beyond  Total Estimated
GF £0 £2,011,535 £7,640,000 £850,000 £1,705,000 £12,206,535
HRA £575 £25,575 £0 £0 £0 £25,575
Common
Good  £0  £0  £325,000  £0  £0  £325,000
Totals £575 £2,037,110 £7,965,000 £850,000 £1,705,000 £12,557,110 
8. Legislation 
Maintaining a public building requires extensive management and coordination of the various
disciplines required under statutory compliance. This involves recurring service inspections
across many elements of a building, which is coordinated centrally from the Contracts,
Compliance & Maintenance team, and covers the following: - 
 Gas Safety/ Soundness tests
 EICR Fixed Wiring
 FRA renewal
 Fire appliance service/ testing
 Fire detection system testing
 Emergency lighting testing
 CCTV service
 L8 ACoP Legionella (RA, biological sampling, temperature testing, etc.)
 TM44 AC/ AHU servicing
 Passenger lift servicing
 Automatic door serving
 Pressurisation vessel service
 Pool plant servicing
In addition, the service administers work activities in locations where there may be asbestos
containing materials (ACMs) present. Any planned construction work is subject to a pre-check
of the asbestos register to determine any presence of ACMs. If appropriate, a Refurbishment
& Demolition survey is commissioned by a specialist contractor, followed by testing at a UKAS-
approved laboratory. All buildings which have ACMs present and listed in the asbestos register
are subject to regular inspections to ensure the materials have not degraded and at risk or
releasing airborne fibres. All works are in accordance with the Control of Asbestos Regulations
2012. 
9. Health and Safety
The Health and Safety at Work etc. Act 1974 is the overarching legislation which covers
occupational health and safety in Great Britain. In addition, the Health & Safety Executive
publication, HSG159 “Managing Contractors” is guidance which is adhered to by the service
when engaging and controlling contractors.
135

Page 136

10 
10. Risk Management
The delivery of the PAMP is affected by a number of constraints including finance, statutory
compliance, backlog maintenance and resources.
Finance is the major constraint, as every local authority addresses the impact of reducing
budgets and the need to do more with less. Better and more efficient ways to utilise buildings
through changing working environments, changing the culture of working practices, co-
location of services/teams requires to be balanced against available budgets.
Statutory compliance is a key issue for operational property and this requirement is a
significant element within the Property Maintenance Budget (PMB) each year.
The ability to effectively maintain operational properties is also affected by available funding,
however the condition surveys which are undertaken on operational property assets are used
to assist with the prioritisation of repairs and maintenance to best utilise the available/approved
funding. Going forward we need to ensure we are investing in a planned and preventative
maintenance programme for the whole estate, thus reducing the likelihood of reactive
expenditure.
Risks to delivery of the PAMP
In delivering this PAMP, there are a number of risks which may impact on the effective
execution, and which require to be considered and mitigated. The potential high-level risks
include the following: -
1. Budgets - External factors including high inflation and global market pressures
(availability of materials/ resources) which impact on construction and maintenance
costs, leading to pressures on routine and reactive maintenance and planned
investment.
2. Business Continuity – robust business continuity arrangements are required across
our property estate to deal with potential operational disruption arising from building
maintenance issues.
3. Legislation - Changing legislation may entail new capital projects to deliver new
services which will put pressure on existing capital plan projects and budgets. This
may also affect retained assets which may mean that some assets are no longer fit for
purpose and require unplanned investment to ensure they are compliant and fit for
purpose for continued service delivery.
4. People - Availability of appropriate and sufficiently knowledgeable staff to deliver on
the priorities and agenda within the PAMP.
5. Net-zero carbon emissions – challenging targets will require significant financial
investment within our property estate 
All of the foregoing potential risks require to be considered and through robust governance
procedures as outlined with the PAMP there may be the opportunity to ensure that the risks
can be mitigated or at the very least sufficient controls can be put in place to ensure the overall
success of the delivery of the PAMP.
Project specific risks
Project risks are managed through the standard project documentation and reporting process.
Individual risks and mitigation measures for each project are captured in a risk register.
Significant risks are also captured in the Project Summary Sheets which are reported to ELT
and CPAG on a regular basis.
12. Governance of the assets
136

Page 137

11
The Council recognises the need to manage its property asset base corporately and has
therefore established a structured approach with clear roles and responsibilities and clarity of
accountability and control.
The diagram below shows the principles of this type of approach of asset management
through integrated corporate ownership:
137

Page 138

12
&
CPAG
(Capital Programme
Planning Asset
Group)
Developing and
delivering NAC’s
capital investment
programme.
7.2t
Principal communications of
asset management through
integrated corporate ownership
Based on RICS Public Sector Asset Management
Guidelines 2011
Active
involvement with
Strategic Asset
Group
Operational Directorate Asset
Representatives 
Develop
operational plans
with AM function
Corporate
Landlord -
Asset Management
Function
Delivered by PMI.
Supports the
Transformation Board
in coordinating AM
strategically, assists
Directorates in
developing future
accommodation needs.
Executive
Leadership
Team
Corporate Decision-
making body.
NAC Cabinet
Approval of strategic AM decisions
Transformation
Board
Coordinates asset
management
strategically and
recommends to
Executive Leadership
Team.
Team Manager
Assets &
Estates
Responsible for
rationalising the
Council’s
operational estate.
Directorate
Project Boards
Asset
Champion
(Director of
Place)
An asset voice at
management/
executive/member
level.
Health &
Social Care
Partnership
Chief
Executive’s Place Communities
& Education
138

Page 139

13
Common Good and Trust properties
The Council manages a number of Common Good and Trust properties throughout North
Ayrshire. Where the Council occupies properties for service delivery purposes an appropriate
rental is paid into the Common Good and/or Trust Funds. These Common Good and/or Trust
property assets are held in trust for the benefit of the local population/communities and
comprise a range of asset types including amenity land, historical buildings, offices, sports
pavilions/pitches, public parks and public buildings. Income generated from the leasing of
Common Good/Trust Funds is used to maintain and repair the property assets where required.
Tenants of Common Good/Trust properties have responsibility for internal repairs and
maintenance.
Leased-out commercial estate
The commercial estate comprises 160 assets which includes 94 industrial assets, 41 retail
units, and 25 offices. The commercial and industrial portfolio transferred to the Business
Support and Development team, who manage the properties with the support of an external
property management consultancy firm, Graham + Sibbald.
13. Future Service Delivery Aspirations/ Challenges
In 2022, PMI and the Transformation team embarked on a study to review the use of buildings
across North Ayrshire as part of the Land and Property Transformation Workstream, to identify
opportunities to consolidate and rationalise the estate. The objective is to reduce our property
running costs and future investment requirements, as well as reduce our carbon emissions.
Progress is reported to the Corporate Transformation Board.
14. Performance Indicators
In accordance with good asset management practice, condition surveys have been
undertaken on operational property assets to assist in the planning of the capital and revenue
investment in the Council’s property assets. Whilst the surveys provide a visual assessment
of the condition of the buildings, the PMI Property Assets & Rationalisation team works jointly
with building users to assess the appropriateness of the environment for the intended use and
service delivery. Thus, suitability is measured alongside condition in assisting in developing
informed opinions in relation to whether an asset is considered to be key to service delivery
and should be retained, where investment in the building will either prolong its life or seek to
better utilise the asset to improve its suitability.
The combination of condition and suitability grading for each property enables investment and
performance decisions to be made and all operational properties form part of a future rolling
programme of surveys to ensure this process is better managed to provide the accurate data
required.
16. Action Plan
Action
Plan
Reference
Action Desired Outcome Lead Timescale
139

Page 140

14
PAMP_A01 Review governance
arrangements
relating to asset
management to
ensure that
strategic asset
management
reflects best
practice.
NAC will have a
property estate
which is being
managed
appropriately and in
accordance with
current guidance.
PMI Mar-24
PAMP_A02 Continue
implementation of
new CAFM system
to replace current
software.
A new CAFM
system will result in
asset management
becoming
integrated in
officers’ daily
duties, making
workload more
efficient, and
providing required
data seamlessly.
PMI Jun-24
PAMP_A03 Review existing
asset management
approach to ensure
information is used
appropriately to
influence
investment
decisions and future
asset management
strategies.
A more robust
process is
established for
identifying
investment
priorities, ensuring
key stakeholders
are included in
strategic decision-
making.
PMI Mar-24
PAMP_A04 Develop
performance
indicators that
reflect a robust
system of financial
management
achieves value for
money.
A set of KPI’s are
formed to highlight
success and
improvement
opportunities.
PMI Mar-24
PAMP_A05 Prepare a detailed
condition survey
programme to
identify sequence
for all future
inspections.
A 5-year cyclical
condition survey
programme is
established,
providing full
transparency for
services and
management, and
ensure all buildings
are attended to in a
timeous manner.
PMI Dec-23
PAMP_A06 Conclude review of
new Insurance
claim process.
An agreed method
for processing all
insurance claims,
PMI /
Insurance
Dec-23
140

Page 141

15 
reducing delays and
impact on end-user.  
PAMP_A07 Finalise PLI capital
project
commitments for
the upcoming 3
years.
A programme is
created for planned
PLI projects giving
opportunity for
collaborative works
with other teams/
services.
PMI Mar-24
PAMP_A08 Complete a data
cleanse of existing
property asset files
in K2 and update
where required.
Obsolete and
superseded data
entries on the
current CAFM
system is removed,
ensuring the asset
register is accurate
and ready for
transition to a new
system.
PMI Mar-24
PAMP_A09 Ensure fire plans
are present and
correct, in
accordance with
new UFAS
changes.
All fire plans are
accurate (building
layout, fire system
devices, legislation
and guidance
correct) to align with
H&S, FRA and
Insurance
concerns.
PMI Dec-23
PAMP_A10 Complete the
review of all
rationalisation
workstreams
(analysis works)
All opportunities
have been fully
assessed (external
and in-house
reviews), and
outcomes then
available to present
to Transformation
Board.
Transformation
/ PMI
Oct-23
PAMP_A11 Complete the estate
surveys of RAAC
All NAC operational
properties with the
potential to contain
RAAC have been
surveyed and
remedial actions
received.
PMI Sep-23
PAMP_A12 Prepare a strategy
for upgrading the
Council estate to
meet ZDE targets.
Collaborative
exercise with E&S
identifying energy
efficiency actions in
the existing
properties to
Sustainability /
PMI
Ongoing
141

Page 142

16 
achieve net zero
carbon emissions  
142

Page 143

ASSET MANAGEMENT PLAN
ROADS
143

Page 144

Page 2 of 42 
‘a strategic approach that identifies the optimal allocation of resources for the management,
operation, preservation, and enhancement of the highway infrastructure to meet the needs of
current and future customers’.
1. Introduction 
This Road Asset Management Plan (RAMP) sets out the Council’s approach for the
management and maintenance of its road assets. 
2. Aims & Objectives 
Road Asset Management 
Road Asset Management is defined in the County Surveyors Framework for Highway Asset
Management as: 
This definition brings together themes that define an asset management approach: - 
Strategic Approach – adopting a strategic approach to maintain and renew the asset and
make best use of available resources for the long-term benefit of the asset. 
Optimal Allocation of Resources – investment is allocated to prioritise the delivery of
corporate objectives and to provide best value to our customers. Asset management provides
a framework for this process by identifying and prioritising needs across the network as a
whole. Lifecycle planning is used to minimise whole life costs to ensure efficient and effective
use of resources. 
Customer Focus – considering the needs and expectations of customers is addressed by
developing appropriate levels of service for each asset. 
Through prudent asset management, North Ayrshire Council will make best use of available
resources in maintaining its road network and associated infrastructure. 
Council Plan 
The importance of asset management is evident in how well managed and maintained road
infrastructure contributes to the Council Plan 2023-28 Priorities: 
Priority – Wellbeing 
• Ensure our places and spaces where we live, work and visit are well maintained and
accessible.
• Developing infrastructure to support business growth. 
Priority – Climate Change 
• Improving resilience and reducing carbon by developing and supporting supply chains
where materials and goods are sourced locally.
• Developing and promoting active travel infrastructure.
• Transitioning to low and zero carbon travel.
144

Page 145

Page 3 of 42
Priority - A Sustainable Council
• Ensuring robust governance arrangements are in place to fulfil the Council’s statutory
duties, manage risk and support delivery of key priorities.
• Working with partners nationally, regionally and locally to secure investment and target
resources towards our priorities.
• Focusing our investment on priorities
• Effective workforce planning ensuring that we have the right skills/resources to deliver
priorities.
3. General Description
The Council’s adopted road asset is made up of:-
Asset Quantity
(31st March 2023)
Unit
Carriageway – Mainland 883.9 km
Carriageway – Arran 166.3 km
Footways/footpaths 1026.84 km
Bridges & Culverts 630 no.
Car Parks 66 No.
Retaining Walls 116 No.
Street Lighting Columns 24,338 No.
Traffic Signals 81 No. of sets
Vehicle Activated Signs 39 No.
Non-illuminated Signs 12,413 No.
Illuminated Signs/Bollards 2,045 No.
Pedestrian Guardrail 10,750 m
Grit Bins 510 No.
Safety Fences 40,575 m
Street Name Plates 3,673 No.
Cattle Grids 11 No.
Verge Marker Posts 4,465 No.
Weather Stations 2 No.
Asset Management Planning Documentation
The following documents are produced to support the asset management process and are
reviewed and updated regularly:
Road Asset Management Plan – records the service standards for each asset group,
identifies risks, reflects local traffic levels, customer preferences and current investment
strategies.
145

Page 146

Page 4 of 42 
Data Management Plan – records methods for collection, validating and updating of asset
data and an action plan for improvements regarding estimated or missing data. 
Road Asset Valuation Report – provides information on data used in the valuation, methods
of calculation and interpretation of results. 
Performance Report – APSE/SCOTS results 
Improvement Action Plan – to support the asset management planning process. 
Customer Information Report – provides current customer information 
APSE / SCOTS Customer Questionnaire – help us understand the customer expectations
and experiences of winter gritting, road works and other road maintenance related matters. 
Road Maintenance Manual – defines how and when each asset group is inspected,
categorisation of repairs, condition assessment, prioritisation methods and procurement and
management of works. 
Annual Status Report – provides a summary of the status of each asset group in meeting
service standards. 
Road Risk Register – details of risks to implementation of the plan 
Works Programme – a Strategic List of Priorities is provided from which the annual
programme is determined. 
Other Road Assets
There are a number of road infrastructure assets currently not covered within the RAMP that
require data to be collected to ensure a complete overview of the Councils’ responsibilities. 
♦ Drainage systems are not covered by this plan. There is limited recorded information
on drainage. New drainage installed or existing drainage that is being worked on, is
included in the recording procedures for asset changes. Historic plans of drainage will
ultimately be fully recorded on GIS. This element will form part of the new SCOTS
asset management project. Sustainable Urban Drainage Systems (SuDs) are an
integral part of all new development. Developers are required to install a SuDs as part
of their drainage infrastructure. NAC have signed up to the Memorandum of
Understanding with Scottish Water that states that Scottish Water will be responsible
for the below ground assets and the council will be responsible for the above ground
asset. As part of the construction consent process, NAC have ensured that the above
ground assets are part of the developments factor arrangements. 
♦ Road & Lighting Infrastructure that is not part of the adopted road network is not
currently included within this RAMP. Work has commenced to collect lighting,
carriageway, and footway condition data for Housing areas, and limited information
regarding additional road infrastructure out with the adopted road network has been
recorded. A methodology for the prioritisation of maintenance on these assets is being
developed. Further work is required to ascertain how the financial valuation of these
non-adopted assets should be reported. There is a list of additional assets recorded
within the GIS system as they are highlighted, and further assets will continue to be
added to the list as they are identified. 
♦ Private Roads and Footways – those not on the list of public roads. This also includes
non-adopted council assets, such as promenades, car parks, council properties and
open space paths.
146

Page 147

Page 5 of 42 
♦ Urban road verges within 30mph zones 
♦ Cycle paths – not forming part of existing carriageways or footways/footpaths 
♦ Private Bridges (including Network Rail and Sustrans structures) 
♦ Roadside Trees that are within the extents of the adopted road network. Trees are
inspected by the Streetscene service when any issues are highlighted by members of
the public or the Roads Inspector. If required, the roads service will serve notice on a
neighbouring landowner to action any problems identified with the tree. 
Flooding Assets 
The Flood Risk Management (Scotland) Act 2009 confers certain powers and places specific
duties on Local Authorities to help them manage flood risk in their areas. Flooding assets
are varied and can include both built and natural features, which are not always located on
Council owned land.
Flood Risk Management assets can be either: 
1. An asset that is subject to Council intervention, which is necessary to reduce the risk
of a flood that is likely to occur imminently and have serious consequences. These
types of assets are only identified in urgent situations and may generally be
maintained by another asset owner at other times.
2. A relevant body of water that has been subject to an assessment, which finds that
clearance and repair work would substantially reduce flood risk; The Schedule of
Clearance and Repair that is published on the Council’s website (available at
https://www.north-ayrshire.gov.uk/Documents/FloodProtection/2019-20-clearance-
and-repair-schedule.pdf) lists the trash screens, watercourses and culverted
watercourses that are regularly cleared and repaired. Note only works that would
substantially reduce flood risk can be undertaken.
3. A formal flood protection scheme. There are Flood Protection Schemes at Largs,
Saltcoats and the Upper Garnock. The standard of protection offered by these
schemes rely on both the maintenance of these assets and on the operation of flood
gates, barriers and other features that are part of the schemes.
4. An asset located on Council owned ground that provides a flood risk management
function. Examples can include built or natural coastal defences, Council owned
drainage infrastructure etc.
147

Page 148

Page 6 of 42
4. Current Performance / Drivers for Change
Service Standards
The following service standards apply to the road asset and define the level of service that
customers can expect. The standards allow the appropriate prioritisation of resources within
available funding. Details of how the specific measures are calculated are included in the road
maintenance manual.
Service Measure Target Standard
Carriageways
Safety
Response times to Category 1 defects 4 hours (24h on Isle of
Cumbrae)
Response times to Category 2 defects 5 working days
Response times to Category 3 defects 60 working days
Routine safety inspection frequency –
Strategic routes
12 times per year
Routine safety inspection frequency – Main
Distributor routes
12 times per year
Routine safety inspection frequency -
Secondary Distributor routes
12 times per year
Routine safety inspection frequency – Link
roads
4 times per year
Routine safety inspection frequency – all
other routes and car parks
once per year
Utility Inspections
% of Sample A Inspections completed
against number of potential inspections
100%
% of Sample B Inspections completed
against number of potential inspections
100%
% of Sample C Inspections completed
against number of potential inspections
100%
Condition
Maintain RCI 34.8%
Maintain condition of A Class Roads at target
levels
32%
Maintain condition of B Class Roads at target
levels
32%
Maintain condition of C Class Roads at target
levels
42%
Maintain condition of U Class Roads at target
levels
37%
Footways
Safety
Response times to Category 1 defects 4 hours (24h on Isle of
Cumbrae)
Response times to Category 2 defects 5 working days
Response times to Category 3 defects 60 working days
Routine safety inspection frequency –
footways associated with strategic, main and
secondary routes
12 times per year
Routine safety inspection frequency –
footways associated with link roads
4 times per year
148

Page 149

Page 7 of 42 
Service Measure Target Standard 
Footways 
Routine safety inspection frequency –
Castlepark and Lower Vennel
Twice per year 
Routine safety inspection frequency – all
other footways and footpaths
Once per year
Condition Maintain % of footways requiring
maintenance at current levels
13%
Service Measure Target Standard 
Street Lighting 
Safety % of street lanterns with a valid Electrical
Test Certificate
40% 
Condition
% of lamps restored to working condition
within 7 days
96%
% of lanterns that exceed their Expected
Service Life should be no more than
20%
% of columns that exceed their Expected
Service Life should be no more than
20% 
Structures 
Safety Carry out General Inspections 2 yearly
Carry out Principal Inspections 6 yearly 
Condition
Response time to emergency calls 4 hours
Target figure for Average Bridge Stock
Condition Indicator
86.4
Target figure for Critical Bridge Stock
Indicator
75 
Traffic Signals 
Response time to attend urgent faults 2 hours 
Safety
Repair/make safe time for urgent faults 4 hours
Response and repair time for non-urgent
faults
12 working hours 
Details of our Road Hierarchy are shown in Appendix B 
Road Condition
The table below shows the Road Condition Indicators for North Ayrshire Council reported as
Statutory Performance Indicators and the comparison with the Scottish average. Road
condition improved from 2014 to 2016 as a result of asset management practices using
lifecycle planning to target investment to make optimum use of available resources. Road
condition deteriorated slightly by 1.3% between 2014-16 and 2016-18, additional budget
invested in roads infrastructure in 2017/18 and 2018/19 stabilised road condition and further
additional investment contributed to an overall improvement in road condition. There has been
a marginal deterioration in the % of the road network that should be considered for
maintenance treatment reported in 2023, additional investment in road infrastructure
improvements in 2022/23 and 2023/24 should assist in improving road condition over the
longer term.
149

Page 150

Page 8 of 42
RCI Comparison to Scottish average
2012-14 2013-15 2014-16 2015-17 2016-18 2017-19 2018-20 2018-21* 2020-22 2021-23
North Ayrshire 40.8 39.1 37.8 38.3 39.1 38.1 37.3 37.1 33.9 34.8
Scottish
average 36.7 37.0 36.7 36.4 36.7 36.3 35.8 35.5 34.2 33.6
Comparison to
Scottish average +4.1% +2.1% +1.1% +1.9% +2.4% +1.8 +1.5 +1.6 -0.3 +1.5
Overall Ranking 21st 20th 20th 22nd 26th 23rd 23rd 23rd 20th 21st
*3 year composite PI due to issues completing survey during Covid19
5. Condition and Suitability
Customer Surveys, Enquiries and Consultation
A Roads Service customer survey was undertaken in 2013. The survey covered customer
contact and levels of satisfaction with various areas of the service – winter service, road
maintenance, street lighting. The surveys identified that although we were delivering a high-
quality service in the works being carried out, the condition of the roads and footways was
perceived to be in decline.
North Ayrshire took part in the National Highways and Transport (NHT) Networks survey in
2016. This survey measures public satisfaction with highways and transport services across
the UK with results shared on the NHT website to encourage benchmarking and drive
improvement.
Contract specific questionnaires are distributed after completion of contracts to properties in
the vicinity of works. These results are recorded on a customer survey database to provide
information for future improvements to be incorporated into Service Delivery.
The Roads Service now participates in the APSE / SCOTS customer satisfaction survey to
enable benchmarking between other Scottish authorities. This is an online survey managed
by APSE that is available to all local authorities to use and it asks a set of standard questions
which are specific to your own council area. This survey is open at all times for members of
the public to access, and available on our website. However, a review of the data collected
indicates that activity is generally as a result of specific social media promotions of the survey
as shown below.
150

Page 151

Page 9 of 42
The results of the customer satisfaction surveys can be found in the Asset group Status reports
in Section 6 - Sufficiency.
North Ayrshire Council has a procedure in place for recording and dealing with complaints.
Details of general enquiries are recorded in the Verient EMPro System and all reported defects
are recorded in WDM Road Management System (RMS). This information highlights numbers
of specific types of fault or faults occurring in a geographical area.
North Ayrshire Council also has representatives who attend various meetings to ascertain
views and/or requirements – e.g. North Ayrshire Access Panel, Community Groups and Estate
Based Inspections. Responses are also sought via the North Ayrshire Community Planning
Partnership People’s Panel that is comprised of 2000 representatives of the population of
North Ayrshire.
Consultation is undertaken through the Locality Partnerships for local people within
communities; set in North Coast and Cumbrae, Three Towns, Garnock Valley, Arran,
Kilwinning and Irvine. This identifies and addresses local issues, sets out priorities for each
locality and how they can be addressed within a developed Locality Plan.
We work closely with Arran Community Council, Visit Arran and other key stakeholders to
consult on works programmed to be undertaken on the Island of Arran to ensure that disruption
is minimised and that any concerns are addressed.
Public consultation exercises are undertaken prior to final design decisions being made about
major projects – for example, consultation has been carried out across West Kilbride to
consider improvements to traffic management in the town and also in Gateside to agree traffic
calming measures to improve safety. Consultation is also undertaken through local press
releases for traffic orders and proposed road closures. An extensive series of consultations
was held during the development of the Millport Flood Protection Scheme.
Condition
SCOTS BACKLOG MODEL
A study was completed in 2010 using the 2007 and 2008 SRMCS data to determine the effect
of applying different maintenance budgets to the Scottish local public road network. This
concluded that the budget required to return to the position where the carriageway is in a good
state of repair (the Headline Backlog figure) was £1.539bn. The model was re-run using 2009
and 2010 SRMCS data in order to determine the effect of the February 2010 winter weather
resulting in a new figure of £1.729bn, an increase of 12.33%. Analysis of information in 2015
identified that the budget required to remove all carriageway defects in 1 year in North Ayrshire
was £30.9million. The backlog figure was re-calculated again in 2017 and 2019. 2017 figures
151

Page 152

Page 10 of 42
were further revised based on the 2019 Scotland wide treatment costs to provide a comparison
with the 2019 figures. The 2019 figures are calculated based on a set of Scotland-wide
treatment costs to provide a sound basis for comparison between family groups, although any
comparisons must still be treated with caution as the widths of carriageway used in the
calculations are a combination of actuals and estimates provided by individual authorities.
Due to the impact of inflationary increases in material and contractor costs, the backlog figure
is being recalculated for 2023 using current market costs to provide a more accurate picture
of the extent of the backlog facing local authorities, this figure is not yet available.
Backlog figures for North Ayrshire Council (to be updated in 2023)
Authority
Network
Length
(km) 2017 2017 (Revised
2019 rates)
2019 % Change
2017 - 2019
North Ayrshire
Council 1,036 £31,653,000 £36,194,000 £34,807,000 -3.8%
Scotland 52,737 £1.671 billion £1.919 billion £1.888 billion -1.6%
Utility Activity
Utility activity can have a major effect on the maintenance and management of the road
assets. There are currently no recorded figures to quantify the effect that utility openings have
on the road structure, but it is widely believed that these lead to an increase in defects and
earlier deterioration of the road surface than would otherwise be expected. All statutory
undertakers are responsible for carrying out their own reinstatements and the new fifth edition
of “Specification for the Reinstatement of Openings in Roads” is going to introduce a 6-year
guarantee on these works.
This change was the result of the Office of the Scottish Road Works Commissioner
undertaking a review of the long-term damage that can result from utility activity. This included
a review of the existing 2-year guarantee period, and it was felt appropriate to change this to
a 6 year period, with some minor exceptions.
152

Page 153

Page 11 of 42
The graph above shows high levels of work for telecoms operators, these are due to the
national rollout of high speed fibre broadband. This has resulted in telecoms poles being
erected in residential areas in addition to an increase in excavations in order that new ducting
can be laid to provide accessibility for all residents.
North Ayrshire Council work closely with utility companies to try to minimise the effects of utility
works on the travelling public and to ensure that, as far as is possible, newly surfaced roads
are not disturbed for a minimum period of 3 years. However, in the event of emergency works
being required or new service connections, the utility companies must be allowed to carry out
their works.
6. Sufficiency (Asset Demand)
There is a constant demand for improved road infrastructure for driving, walking, cycling and
accessibility.
Environmental factors also impact on both deterioration of the road network and the solutions
that can be found to address the challenges of providing a sustainable network for the
travelling public.
Environmental Factors
- Climate change – changeable weather conditions with severe  weather  extremes
becoming more common result in rapid deterioration of the road network. Landslides
undermining roads on Arran have resulted in prolonged closures on both the Ross
Road and at Kildonan within the last 2 years. Further landslides have been reported
in 2023 as a result of heavy rainfall. Further, re-routing of traffic due to prolonged
closures results in heavy vehicles causing damage to alternative roads not constructed
to withstand either the volume or type of traffic.
- Winter weather – harsh winter weather, particularly the extreme low temperatures
becoming more common causes significant damage to road surfaces
- Flooding – flooding is becoming more common due to prolonged periods of intense
rainfall with historical road drainage unable to cope. This further leads to rapid
deterioration on rural roads where there is little or no formal drainage in place.
- Electric Vehicle Charging has introduced a number of new assets within public car
parks to allow members of the public access to charge their vehicles.
- Electric cars are around twice as heavy as standard vehicles and are expected to
cause increased deterioration to road networks, with further deterioration as a result of
the introduction of electric buses and lorries which are significantly heavier
- Materials are constantly under review to see if there are more sustainable and
environmentally friendly products available that meet the required standards. Recycled
materials are considered for use where appropriate.
153

Page 154

Page 12 of 42
Asset Group Status Reports
The status of the major asset groups that make up the road asset as of April 2023 are
summarised in the following pages: -
Carriageways
The Asset
Statistics
North Ayrshire Council has 1050 km of public road network.
Growth of 0.80% over the last 5 years.
Growth of 14.32 km over the last five years.
Commentary
Predicted growth over the next 5 years
of 0.2% per year.
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 show a decrease in
satisfaction with the maintenance of
our roads. The 2016 NHT survey
indicates the low level of satisfaction
with the condition of our roads.
Customer
Expectations
Overall Satisfaction with Winter Service
30%
This decrease in satisfaction with our
road network is despite an
improvement in overall road condition
and indicates the increasing
expectations of the community.
A roads customer survey created
jointly by APSE/SCOTS to enable
national satisfaction comparison was
made available. It asked, how satisfied
or dissatisfied are you with the
condition of roads, this indicates that
the satisfaction level has now dropped
to 16%.
70%
Satisifed
Dissatisfied
A winter survey carried out in 2013
indicated that 70% of the community
are satisfied with the winter service
provided. The APSE / SCOTS survey
in 2022 shows that the level of
satisfaction with the winter service has
remained the same.
Condition
Road Condition Indicator v
Scottish Average
40.00%
38.00%
36.00%
34.00%
32.00%
30.00%
2017 2018 2019 2020 2021 2022 2023
REPORTED YEAR
SRMCS results in 2017/19 indicate
that 38.1% of our carriageways may
require attention – approximately
400km.
Our RCI has improved with 34.8% of
our road network to be considered for
maintenance in 2023. The Scottish
Average has improved over the same
period to an RCI of 33.6%.
Increased investment in road
maintenance since 2020/21 should
assist in maintaining current
condition.
RCI Scottish Average
% Satisfied with Maintenance of
Roads
50%
40%
30%
20%
10%
0%
RCI
154

Page 155

Page 13 of 42 
Investment 
Investment
Historical
Historical Investment
£7,000,000
£6,000,000
£5,000,000
£4,000,000
£3,000,000
£2,000,000
£1,000,000
£0 
Financial Year 
These figures include capital and
revenue investment in planned
maintenance works. 
The investment figures include
planned kerbing works (as per
Financial accounting guidelines),
planned patching and works carried
out for external authorities 
The carriageway investment plan
includes £3.8m Capital Investment
and £0.5m Revenue. These
investment levels were set to maintain
steady state in road condition. The
reported steady state figure in 2019
increased to £4.3m. 
Investment in 2023/24 includes £3.8m
Capital Investment and £0.5m
Revenue to maintain current road
condition.  An additional £0.5m
Capital and £1m Revenue funding
was agreed for 2023/24 bringing the
total investment to £5.8m.   
Valuation
(Figures to be
recalculated by
SCOTS in 2023) 
Steady State figure £4.3million (May 2019) 
(Increased from £3.8m in May 2017) 
Cost per year to maintain the current
Road Condition Indicator (RCI). (1) 
Headline backlog figure is £34.8million. (May 2019)  Budget required to remove all defects
in one year. 
Planned
Future Investment 
It is calculated that £11.1million per year is required to
prevent further deterioration across the network. This figure
does not include for increasing materials and construction
costs. 
This figure does not take into
consideration the additional costs
associated with surfacing works on
Arran. Increased costs are estimated
to be 50% for materials and transport.
No distinction is made between capital
or revenue funding. 
Forward Works
Programme 
A forward investment plan has been developed for Arran
using Road Condition data and Inspectors surveys which
also takes account of identified community priorities to
provide options for optimising investment. A 3 year plan for
the Mainland is currently being revised due to changes to the
plan as a result of rapid deterioration in some areas. 
Locations identified are subject to
annual re-assessment. Our system is
utilised to identify the optimum
strategy for long term planning for road
maintenance which maximises budget
efficiency for both Arran and the
Mainland. 
(1) The Steady State calculation is based on investment required to ensure carriageways currently in amber condition do
not deteriorate to red condition, and carriageways currently in good condition do not deteriorate to requiring maintenance
treatment. This figure does not include treating all carriageways currently requiring major maintenance works as those in red
condition will not deteriorate further
155

Page 156

Page 14 of 42
Footways Statistics Commentary
The Asset
North Ayrshire Council has 1014.8 km of footway/footpath
network.
Growth of 1.6% over the last 5 years.
An extra 17.1 km of footway to be maintained.
Predicted growth over the next 5
years of 0.15% per year.
Predicted increase in footway length
of 7.5 km over the next 5 years.
% Satisfied with
Footway/Footpath Surfaces
Good Cycle
FacilitieRsoads being
Good Street 9% in good
Lighting condition
21% 24%
Good Safe Roads
Pavements 24%
22%
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 show a decrease in
70%
60%
50%
40% 30%
satisfaction  with  the  maintenance of
footways and footpaths. The NHT
survey indicates that this increased to
54% of respondents satisfied with the
condition    of    footways.    From  the
20%10%
0%
APSE/SCOTS survey in 2022 we saw
a decrease to 46%.
Footways are third only to safe roads
and good road condition as the most
important assets to our customers.
Customer Expectations
A condition survey of the whole
% footway requiring treatment footway is completed annually.
Assessments  are  undertaken  by the
20.00% Road Inspectors as part of their
15.00% inspection programme.
Condition 10.00% Condition assessments carried out on
5.00% the   footway   network   indicate   that
footway condition is around 12% of our
0.00% footway/footpath network is currently
in need of maintenance treatment –
approximately 122km.
156

Page 157

Page 15 of 42
Investment Historical
Historical Investment
£700,000
£600,000
£500,000
£400,000
£300,000
£200,000
£100,000
£0
Financial Year
Planned footway maintenance
includes footway resurfacing/
reconstruction and planned footway
patching.
Additional investment in 2016/17 was
as a result of capital investment in
town centre regeneration projects,
however remaining years have stayed
relatively stable.
It is expected that footway condition
will continue to stay static around 12%
unless the level of investment is
increased.
Planned
Future Investment
It is calculated that £1 million per year is required to prevent
further deterioration in the footway network. This figure does
not include for increasing materials and construction costs.
This figure does not take into
consideration the additional costs
associated with surfacing works on
Arran. Increased costs are estimated
to be 36% for materials and transport.
No distinction is made between capital
or major revenue funding.
Forward Works
Programme
All footways requiring maintenance treatment are assessed
according to our priority assessment matrix. This lists all
footways requiring maintenance works in order of priority.
Locations identified are subject to
continual re-assessment.
Investment
157

Page 158

Page 16 of 42
Structures Statistics Commentary
The Asset
The Structures asset consists of:
249 Road Bridges
88 Footbridges
116 Retaining Walls
293 Culverts
7 Underpasses
1 Tunnel
34 Revetments
The figure for the length of retaining
walls is estimated.
There are two flood protection
schemes currently being progressed -
Upper Garnock Valley, Largs Seawall
and Millport which will involve the
creation of a dam and rock armour sea
defences.
Customer Expectations 100% of requests relating to abnormal loads are responded
to within service response times.
There have been no adverse
comments in respect of Structures.
Condition
Bridge Condition Indicators
95
90
85
80
75
70
BSCIcrit BSCIav
The Bridge Condition Indicators
require that Principal Inspections (PIs)
are undertaken over a 6 year cycle. A
combination of a backlog of PIs and
limited capital investment has resulted
in a deterioration of bridge condition.
Capital investment from 2016/17
onwards has seen the rate of decline
reduce in BSCIs.
General Inspections (GIs) are
undertaken 2 yearly.
Investment Historical
Historical Investment
£1,400,000
£1,200,000
£1,000,000
£800,000
£600,000
£400,000
£200,000
£0
These figures represent revenue
expenditure only from 2013/14 to
2015/16. The application of asset
management to maintenance of the
structures asset resulted in planned
Capital investment of £560,000
annually for maintenance of Structures
assets from 2016/17 util 2022/23.
Further additional Capital investment
of £300,000 was made in 2018/19 to
carry out improvement works.
Financial Year
Investment
158

Page 159

Page 17 of 42
Planned
Future Investment
Estimated Outstanding Maintenance Work Required
Scour
Protection
5%
Parapet
Upgrades
32%
Road
Bridge
Replaceme
nt/Strengt
hening
37%
Footbridge
Culvert Replacement/
Replacement/ Strengthening
Strengthening 24% 2%
Value of outstanding maintenance
work for the Structures asset is
estimated to be £6.7million.
This estimate is based on the
inspections that have been carried out
to date and may rise as inspections
are reviewed.
A formalised process for establishing
the ongoing, long-term budgetary
requirements for the maintenance of
the Structures Asset, is being
developed to build upon existing
Capital Programme Asset Group
(CPAG) work.
Forward Works
Programme
The capital programme is identified based on the structures
prioritisation methodology which ranks assets based on a
number of factors including condition, safety, and usage.
The revenue programme is based on
priorities from identified maintenance
work, this is adapted throughout the
year due to defects of a higher priority
being identified through the annual
inspection process.
All works are subject to continual re-
assessment. The capital programme
may be revised as a result of higher
priorities being identified through
results of inspections.
159

Page 160

Page 18 of 42 
Lighting Statistics Commentary 
The Asset 
No. of luminaires 24,448
No. of columns 24,338 
Over the last 3 years the no. of luminaires has increased
by 821 reflecting a rise of 3.4% per annum and the no. of
lighting columns has increased by 1002; a rise of 4.1%. 
The growth pattern is expected to
remain constant due to additional
infrastructure as part of new
developments. In addition,
infrastructure replacement works will
continue to increase the number of
lighting points to reflect current design
spacings. 
Customer Expectations 
% Satisfied with Street Lighting
Provision
100%
80%
60%
40%
20%
0% 
Customer Enquiries and Service Requests 
Roads
Lighting 51% 49% 
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 indicated an increase in
satisfaction with the provision of street
lighting. The NHT survey shows a
decrease in the level of satisfaction
with street lighting. 
The lower level of satisfaction may be
due to the introduction of LED lighting
which is being installed across North
Ayrshire as part of an energy efficiency
programme. These ensure that the
lighting is concentrated onto the road
network thereby reducing light spread
onto surrounding private areas,
gardens and pathways. 
The APSE/SCOTS survey now shows
that the level of satisfaction for street
lighting has remained the same as the
2016 survey at 72%. 
In 2017/18, 49% of enquiries and
service requests recorded for the
Service were regarding Street
Lighting. This is an increase of 8%
over the last 2 years. This may
partially be a result of public reaction
to the changed perception of lighting
levels from the installation of LED
lighting, but is also partially resulting
from policy decision to remove night-
time fault inspection arising from
longer life LEDs. 
160

Page 161

Page 19 of 42
Condition
Columns & Lanterns exceeding
expected service lives
6000  
5000
4000  
3000
2000
1000
0
Financial Year
Columns Lanterns
The number of lanterns exceeding
expected service life has decreased by
55% since 2013/14, due largely to bulk
LED lantern changes despite
fluctuations in Capital investment.
The increase in the number of columns
exceeding service life may have been
affected by estimated historic
installation date records and will also
be affected by reprofiled capital
investment in the years 2019-21. The
age profile of lighting assets is variable
dependent on original development or
bulk spend and over years can
account for differences in age expired
units. Overall the profile is managed
through use of structural safety
inspections which allow targeted
replacement and budget setting to
maintain at least a static depreciation.
A SCOTS exercise to further refine the
life expectancy of L.A. cable network is
ongoing
Investment Historical
Historical Investment
£3,000,000
£2,500,000
£2,000,000
£1,500,000
£1,000,000
£500,000
£0
Financial Year
Level of historic investment reflected
the ongoing £1m approx. required
annually to maintain existing lighting
infrastructure depreciation. Reprofiled
Capital in 19/20 resulted in reduced
investment to £750k. This has been
restored in later years.
An increase in investment from
2014/15 to 2017/18 is due to a major
spend to save energy initiative to
introduce LED lanterns into approx.
60% of the network. This resulted in an
energy efficiency saving of an
estimated £570k per year. However,
reduction in energy and carbon has
been offset by significant increased
energy costs since 2022.
Planned
Future Investment
Forward Works
Programme
Capital Investment
2015/16 - £2,654,000
2016/17 - £2,222,000
2017/18 - £1,460,428
2018/19 - £1,000,000
2019/20 - £750,000
2020/21 - £750,000
2021/22 - £1,940,000
2022/23 - £1,250,000
Structural inspection programme of risk certification is
ongoing.
Priority major infrastructure replacement programme is
drawn from inspection, age profile and asset profile
information.
The additional spend to save
investment was completed in 2017/18
reducing investment thereafter to the
ongoing £1M approx. annual
investment to maintain the lighting
infrastructure depreciation at status
quo. However, reprofiled investment
over financial years 2019 – 2021
impacted these statistics with an
increase in units exceeding life
expectancy. There was also a further
identification of £690k energy
efficiency funding in 21/22 for earlier
installed white lighting units to be
converted to LED.
Continued structural inspection
manages risk between priority
replacement and interim inspection
certification.
Investment
Number
161

Page 162

Page 20 of 42
7. Financial
Historical Expenditure
Historical expenditure on the Road Asset over the last 5 years is shown in the table below:
Asset Works 18/19
£
19/20
£
20/21
£
21/22
£
22/23
£
Carriageways
Reactive 1,210,964 1,087,364 885,282 987,755 637,259
Routine 371,277 262,830 224,136 184,966 280,516
1Planned 4,568,828 3,821,785 4,047,703 5,642,824 5,205,937
Footways Planned 272,982 4409,610 4528,053 4538,415 4530,857
Winter
Maintenance
CW and
FW 685,632 481,195 611,076 452,926 493,955
Structures Total 2950,153 267,054 623,258 1,102,570 1,068,433
Lighting
(excluding
energy costs)
Cyclic 47,316
31,084,258 1,125,450 1,346,570 Figures not
available Reactive 211,482
Planned 1,026,793
1Planned carriageway expenditure includes externally funded improvement works and additional
allocated budget
2Additional Capital investment allocated for Structures planned improvement works from 18/19 onwards
3Total spend as internal works claims are not broken down into work types.
4Revenue footway budget remains at £250k, externally funded improvements, generally on shared
paths, have increased investment on the footway network. In addition, footway improvements are being
included as part of capital carriageway resurfacing projects
Expenditure on street furniture and traffic management systems have been excluded from
these figures as maintenance is based upon ongoing inspection regimes which determine
repairs/replacements to be carried out on a needs basis.
Planned Investment
Service standard targets and investment strategies are based on available budgets detailed
in the table below. Any changes to these predicted budget levels will require changes to both
service standard targets and investment programmes. These budget figures are based on a
10 year plan and can vary annually depending on grant funding and further budget allocations.
Due to internal payment management systems with internal service providers, it is not possible
to break down lighting costs to equivalent figures for cyclic, reactive and planned work types.
The breakdown shown for long term funding reflects the annual capital grant and revenue
budgets for the lighting service broken down to an estimated split.
162

Page 163

Page 21 of 42
Asset Works £’000 Long Term
Funding £’000
2020/21 2021/22 2022/23 Y4-Y10 pa
Carriageways Reactive/Routine £1,100 £1,100 £1,100 £1,100
Planned £3,800 £3,800 £3,800 £3,800
Footways Reactive/Routine £130 £130 £130 £130
Planned £250 £250 £250 £250
Structures Reactive £135 £135 £135 £135
Planned £560 £560 £560 £560
Street Lighting Energy Costs £643 £678 £693 Based on current
energy supplier
prices. Long term
market prices are
unpredictable
Cyclic £47
Not Available
£100
Reactive £289 £350
Planned £1,027 £800
Investment Strategies
The strategies in this section have been determined using predictions of future condition over
a 10-year period. The predictions enable strategies to be created to look at the whole life cost
of maintaining the asset. Using long term predictions means that decisions about funding
levels can be taken with due consideration of the future maintenance funding liabilities that
are being created. Investment strategies for the major asset types are summarised below.
These strategies are designed to enable the service standards in section 5 to be delivered.
Investment between Asset Types
In comparison to historical investment future investment is planned to be:
− Carriageways: level of investment - £3.8m Capital investment planned annually, expected to
be maintained until 2025-26. Revenue contribution to planned investment expected to be
maintained at £500,000. These figures meet the current steady state figure calculated by
SCOTS to maintain existing road condition. Investment in 2023/24 includes £3.8m Capital
Investment and £0.5m Revenue to maintain current road condition.  An additional £0.5m
Capital and £1m Revenue funding was agreed for 2023/24 bringing the total investment to
£5.8m.  This level of investment should help to counter inflationary increases in contractor
and material costs and assist in maintaining levels of improvement in road condition.
− Footways: level of planned investment decreased to £250k to assist in maintaining
carriageway investment levels, grant funding for active travel and footway improvements as
part of capital carriageway works have increased the level of investment annually in the
footway asset.
− Structures: level of investment increased from 2016/17 to enable a programme of
improvements. Additional Capital investment of £300,000 was granted in 2018/19. Investment
of £560,000 is expected to remain steady going forward.
− Street lighting; level of investment was increased until 2017/18 as part of a ‘spend to save’
initiative to introduce modern efficient LED lighting. Capital investment of £1M annually
163

Page 164

Page 22 of 42
required to keep pace with annualised depreciation, was reduced in 2019/20 and 2020/21 to
£750k before reprofiled increase in subsequent two years. The immediate impact of this was
164

Page 165

Page 23 of 42
an increase in depreciated assets which resulted in reprofiling to £1.25m in the following two
years which should stabilise the annual depreciation figures by 2024/25.
Carriageways
The investment strategy for carriageways is to optimise investment by using life cycle planning
to undertake targeted improvements to ensure that efficiency of spend is maximised. This will
increase investment in lower cost treatments, although investment will also require to continue
in higher cost resurfacing where carriageways are in poor condition. The budget available is
insufficient to undertake a full preventative programme as there are areas of major
deterioration that must be addressed for public safety. The strategy is to minimise
deterioration by optimising available investment in order to maintain current condition.
The above illustration shows that by applying road asset management principles the whole
life cost of maintaining the asset is greatly reduced. The use of preventative maintenance
treatments at the optimum intervention timings extends the life of the asset leading to less
need for reactive and planned maintenance.
The budget currently allocated for planned maintenance is to meet the steady state figure
calculated by SCOTS to assist in maintaining current road condition as measured by the Road
Condition Index. This figure is being recalculated to take into account inflationary increases
in construction costs and is expected to be available late 2023. A programme of carriageway
screeding is planned annually to improve our rural road network.
A method of prioritisation is utilised in addition to Scottish Road Maintenance Condition survey
data to target investment for long term planning. Carriageway prioritisation data is included at
Appendix C.
Footways
The strategy for planned improvement works to footway is to develop a long-term programme
for footway improvements using our prioritisation matrix (Appendix D).
165

Page 166

Page 24 of 42
Preventative treatments have been used in previous years in residential streets but had poor
feedback from the public. As a result of this, all town centre footways are resurfaced in asphalt
with white limestone chips or to meet public realm requirements, but all other footways are
now resurfaced with a 6 or 10mm asphalt concrete finish as this is a more efficient use of
limited funding for footway improvements. Although initial feedback has been varied on this
matter, it is more acceptable to our residents than the extended use of thin surfacing
treatments.
To move to programming investment in our footway network using lifecycle planning, there is
a requirement to use a range of treatments. As thin surfacing treatments are further
developed, they will be trialled, and the results analysed to enable lifecycle planning to be fully
implemented and investment optimised across our footway network.
Routine and reactive repairs are expected to continue at current levels and will be undertaken
within available budgets.
Structures
The structures maintenance strategy is to use available funding to ensure the safety of the
travelling public by maintaining the structures in a serviceable condition. The methodology
used to allocate Revenue and Capital funding is outlined below.
Revenue
Works carried out under the revenue budget are generally reactive and routine works identified
through the inspection regime and/or reported defects from the public.
Works identified, where there is insufficient budget to immediately carry out repairs and where
they are not prioritised due to safety reasons, are recorded in the Work Bank which is a list of
works to be completed as funding is available.
The maintenance strategy attempts to balance the need to complete essential reactive works,
whilst allocating funds to routine preventative and corrective works identified through
inspections. A reduction in routine maintenance will accelerate the rate of deterioration of the
asset.
Capital
A capital budget has been allocated to the structures asset from 2016/17. This is enabling a
programme of strengthening and replacement to be put in place.
These works will be prioritised using the structures prioritisation methodology and a
programme of works established. The Structures Prioritisation Matrix is contained in Appendix
E.
The annual capital budget allocated is £560,000. This means that the current list of works
required would take approximately 12 years to compete.
Street Lighting
The investment strategy for lighting is to continue to use lifecycle planning to undertake
targeted improvements of the overall asset infrastructure by using the prioritisation of profiled
deteriorated, age expired and energy improvement opportunities. This is to ensure that the
asset remains safe and fit for purpose and avoids collapse and injury, such as that
experienced in 2023 in Glasgow.
166

Page 167

Page 25 of 42 
The funding available currently for infrastructure replacement will not be sufficient to improve
the age/condition profiles, however the overall strategy is to minimise further deterioration of
the asset profile by keeping pace with annualised depreciation. 
However, the short term reduced Capital investment resulting from reprofiling will increase the
annualised depreciation cost; increase poor condition assessment statistics; increase the
impact of energy increases, carbon tariffs and unplanned reactive repairs on future revenue
budgets until the balance is redressed from increased spend in subsequent years. 
The Capital funding will continue to be required to support annual replacement of deteriorated
support column and cable infrastructure on those locations which have been converted to
energy savings lanterns, as those supporting networks themselves become deteriorated and
age expired. 
8. Legislation
Legislation can lead to increased demand on Local Authorities’ resources in managing their
road assets. The following list is legislation requirements currently in place that have an impact
on the Road Service and should be taken account of: 
- Roads (Scotland) Act 1984
- New Roads and Street Works Act 1991
- Transport (Scotland) Act 2005
- Transport (Scotland) Act 2019
- Flood Risk Management (Scotland) Act 2009
- Disabled Persons Parking Places (Scotland) 2009
- Traffic Signs Regulations and General Directions 2016
- Reform of red diesel and other rebated fuels entitlement
- Public Health etc. (Scotland) Act 2008 (Artificial Light Nuisance)
- Electricity at Work Regulations 1989
- Environmental Protection Act 1990
- Clean Neighbourhoods and Environmental Act 2005
- Climate Change (Scotland) Act 2009 
As well as the above primary legislation, there are also secondary legislations, these are
Regulations and Orders that are made under the enabling powers provided by primary
legislation in order to implement and administer the requirements of that primary legislation.
- The Road Works (Reinstatement Quality Plans, Qualifications of Supervisors and
Operative and Miscellaneous Amendments) (Scotland) Regulations 2023
- The Scottish Road Works Register (Prescribed Fees) Regulations 2022
- The Scottish Road Works Commissioner (Imposition of Penalties) Regulations 2022
- The Road Works (Qualifications of Operatives and Supervisors) (Scotland)
Amendment Regulations 2019
- The Road Works (Inspection Fees)(Scotland) Amendment Regulations 2014 
The following national policies and guidance documents also have an impact on the service
provided:
- Well-Managed Highway Infrastructure: A Code of Practice
- Safety at Street Works and Road Works: A Code of Practice
- Designing Streets Manual for Scotland
- SCOTS National Roads Development Guide
167

Page 168

Page 26 of 42
- SUDS Section 7 agreements may create further maintenance responsibilities in
relation to sustainable drainage systems. Section 7 agreements state that the Roads
Authority and Scottish Water may agree to the provision, management and
maintenance or use of their sewers or road drains for the conveyance of water bringing
shared responsibilities for systems.
- Cycling by Design
- BS 7671:2018 The Requirements for Electrical Installations
- BS 5489-1-2020 Design of Road Lighting : Code of Practice
9. Policy/Guidance
The following policies associated with the Roads asset have been approved by the Council
Members:
- Council Plan
- Performance Management Framework
- Corporate Procurement Strategy
- Place Directorate Plan
- Roads Operational Plan
- Road Asset Management Plan
- Permission for Attachment of Amenity Displays
- Arran Lighting Policy
- Lighting Energy Efficiency Strategy
- Local Transport Strategy
- Winter Service and Weather Emergencies Plan
- Road Asset Safety Inspection Policy
Guidance
- Well Managed Highway Infrastructure - Code of Practice
- BS 5489-1-2020 Design of Road Lighting – Code of Practice
10. Health and Safety
The assets are managed in accordance with Well Managed Highway Infrastructure – A Code
of Practice. The code highlights a statutory obligation on Highway Authorities to maintain the
public highway and embraces the 2 essential functions of Safe for Use and Fit for Purpose.
- Safe for Use requires carriageways to be managed in such a way that they do not pose
an unacceptable risk to public safety.
- Fit for Purpose requires carriageways to be managed in such a way that they remain
available for use by traffic permitted for the route.
Road Safety information and details of initiatives to promote road safety are available
from I:\All Departments\SCOTS Asset Management Project\Road Safety.
Structures assets are managed in accordance with the Code of Practice for
Management of Highway Structures. The code highlights a statutory obligation on
Highway Authorities to maintain the public highway and embraces the 2 essential
functions of Safe for Use and Fit for Purpose.
168

Page 169

Page 27 of 42 
- Safe for Use requires a highway structure to be managed in such a way that they
do not pose an unacceptable risk to public safety. 
- Fit for Purpose requires a highway structure to be managed in such a way that they
remain available for use by traffic permitted for the route. 
Regular inspections of structures identify problem areas that require urgent rectification or
the imposition of other safety measures such as the implementation and enforcement of
weight or height restrictions. 
The lighting assets are managed in accordance with Well Managed Highway Infrastructure
– A Code of Practice The code highlights a statutory obligation on Highway Authorities to
maintain the lighting asset and embraces the 2 essential functions of Safe for Use and Fit for
Purpose. 
- Safe for Use requires lighting plant to be structurally & electrically safe. 
- Fit for Purpose requires lighting to be operational or to restore inoperative lighting within a
defined time. 
The lighting levels and outputs are defined within British Standard BS5489-1:2020 A Code of
Practice for the Design of Road Lighting and within the ILP Guidance Note 01/21: The
Reduction of Obtrusive Light (JM) and are based on type of road and night-time use of road,
environmental area and whether an alternative lit route is available. 
Works carried out which involve traffic management, excavation or working at height are
progressed in accordance with the legislative framework provided within.
- The New Roads and Street Works Act 1991
- The Working at Height Regulations
- The Electricity at Work Regulations 1989 
Overarching requirements in respect of climate change are managed with respect to Climate
Change (Scotland) Act 2009. 
11. Risk Management 
This section summarises how the council’s risk management strategy is applied to the
management of the road asset. It identifies where risks associated with the road asset are
recorded, identifies the major risks associated with the asset and outlines how they are
currently being controlled. 
Corporate Risk Management Strategy
The Corporate Risk Management Strategy provides a framework through which risk can be
identified and managed, thereby reducing the Council’s exposure to loss. 
Risk Identification
The Roads management team identifies significant strategic risks impacting upon the priorities
outlined in the Councils Plans. 
Risk Categorisation
A risk assessment matrix is used to identify the level of risk associated with carriageway and
footway defects and to categorise and prioritise repairs accordingly. There is a long-
established process in place to risk assess and prioritise defects related to structures.
169

Page 170

Page 28 of 42 
Risk Control 
Risks within the Roads Service are controlled by carrying out inspections in accordance with
Codes of Practice, adherence to the winter policy and compliance with the Flood Risk
Strategy. 
Monitoring and Reporting 
Risk is continually monitored by the Roads management team and reported to the Corporate
Management Team through quarterly performance reports and annually through the Roads
Operational Plan. 
Risk Register 
A corporate risk register has been produced and this contains the risks associated with
Neighbourhood Services. A summary of the risks associated with the Roads Service are
recorded in the following table: 
Risk Strategic / Corporate /
Operational
Climate Change Operational
Financial Variation on Flood Scheme Operational
Flood Programme Risk Operational
Energy Pricing Corporate
Sustainability of Asset Management
Model (Capital Investment)
Operational
Decriminalised Parking / Legislative
Changes
Operational
Workforce Demographics /
Contingency Capacity Risk
Operational
Recruitment / Retention Corporate
Reputation Risk Corporate
Fuel Resilience Operational 
Specific risks associated with the Roads asset are recorded in the following table: 
Risk Controls Monitoring Process
Reduced resources
leading to a
reduction in levels of
service and an
increase in
complaints and legal
claims
Road Asset Inspection
Policy 
Prioritisation scheme
for works
Regular monitoring of
performance
achievable with
allocated resources 
Number of 3rd party
liability claims 
Number of defects
reported
170

Page 171

Page 29 of 42
Risk Controls Monitoring Process
Failure of street
lighting electrical
networks leading to
dark area or
electrical accidents
or injury
Statutory Inspection
Regime
Number of units with
valid electrical
inspection
Failure of street
lights leading to
accidents
Regular inspection
programme in place
and investment in
replacement
programme
Number of reported
dark lamps
Failure of street
lighting structures
leading to damage
or injury
Regular inspection
programme in place
and investment in
replacement
programme.
Number of age expired
units with valid
structural inspection
certification
Flooding leading to
service and local
transport disruption
and associated
financial cost
Emergency plans for
flooding
Flood Risk Strategy
Regular inspection of
trash screens and
culverts
Severe winter
weather or failure of
proactive winter
procedures leading
to traffic disruption
and impact on the
local economy
Annual review of winter
maintenance policy.
Operative training in
winter procedures
% of priority routes
completed on time
Ongoing review of
measures in place
throughout the winter
period.
12. Governance of the Assets
Plan Management
The Head of Neighbourhood Services is responsible for management and control of the plan,
and the Senior Managers (Roads and Engineering Services) are responsible for its
implementation.
This Roads Asset Management Plan (RAMP) will be presented to Members as a component
of the overall Corporate Asset Management Plan.
Plan Review
The plan will be reviewed annually as part of the Council’s service planning and budget setting
exercise and in response to planned changes within the delivery of Council services.
171

Page 172

Page 30 of 42
13. Service Delivery Aspirations/Challenges
The roads infrastructure asset is constantly changing as a result of changes in legislation,
active travel improvements, public transport infrastructure improvements, the introduction of
electric vehicles charging points, requirements for traffic calming measures, and to meet
community aspirations.
Asset Growth
In addition to the above reasons for asset growth, this also arises from the adoption of new
development sites.
The carriageway asset has increased by 1.17% over the last 5 years, which has resulted in
an additional 12.2 km of carriageway to be inspected and maintained. This increase included
an additional 3.56km from the de-trunking of the A737 through Dalry. Due to the increase in
new housing developments, it is expected that the carriageway asset growth will increase at
approximately 0.4% per year. Growth of our footways/footpaths over the same period was
10.9 km representing a 1.08% increase over the same 5-year period, this is expected to
decrease by 0.2% per year due to the increased use of shared surfaces and the resultant
decrease in footway provision.
The number of lighting columns has increased by approximately 0.22% over the last 5 years.
This rate of growth is due both to adoption of new development sites and increased numbers
resulting from improvement of lighting to current standards. This trend is expected to continue.
The number of traffic signals remains relatively static with any increases due to a requirement
to regulate traffic flow on busy routes and to provide safe crossing points for the public. A
number of driver feedback signs are provided, all of which have been installed in the last 8
years.
New infrastructure that isn’t going to form part of the public road network and appear in the
List of Public Roads is classified as non-adopted assets. These mostly consist of new
cycleways and remote paths. These are not recorded as part of the adopted network assets
but do increase the inspection and maintenance liability of the service.
Flooding has seen a significant capital investment in recent years and this has resulted in
several large scale flood prevention schemes, namely, Largs Seawall, Garnock Flood
Prevention scheme and Millport Flood Prevention.
Increasing demand for speed reduction measures is likely to continue, particularly as a result
of the ongoing assessment of 20mph limits for residential streets as part of the Scottish
Governments National Strategy to ensure all appropriate roads in built up areas have a speed
limit of 20mph by 2025. The installation of traffic calming measures and associated signage
further incurs additional maintenance costs.
Traffic Growth
Demand for traffic management measures and parking availability as a result of increased car
ownership has resulted in an increasing number of enquiries and requests for the service to
‘do something’ to alleviate the problem. It is hoped that improvements in public transport, and
cycling/walking facilities will encourage active travel and have an impact on the level of
demand on the road infrastructure.
Traffic movements are also affected by roadworks and changes to the trunk road network
resulting in increased loading on carriageways not designed for high levels of traffic. A shift
172

Page 173

Page 31 of 42
in local traffic patterns took place with the opening of the 3 Towns by-pass in 2005 and again
with the opening of the new Dalry Bypass in April 2020. The opening of the 3 Towns bypass
resulted in significant deterioration of the B714 as a result of increased traffic volumes, partly
due to drivers choosing to use the B714 as an alternative route when traffic management is in
place in Kilwinning. It is anticipated there will be another change in future years when the
realignment and improvements on the B714 are complete.
With the proposed B714 improvement works it is expected that there will be an increase of
traffic through Kilwinning while works are being undertaken, however this should only be a
temporary situation while the public find alternative routes to avoid the construction work.
Road Equivalent Tariff (RET) was introduced on ferry routes to Arran with a reduction in fares
for the travelling public. There is currently no information available on any increase in vehicular
traffic as a result of this however, anecdotal information suggests a significant increase due to
the influx of tourists, with private cars and bus tours throughout the summer months further
contributing to the deterioration of Arran’s roads. There are projected figures for increases in
timber transport calculated from predicted volumes of timber to be felled in future years. It is
estimated that haulage traffic had increased by 39% between 2012-2016 and 2017-2021, the
demands placed on the road network by timber haulage is expected to continue.
Traffic Composition
Traffic composition is considered where deterioration in the road surface requires repeated
maintenance.
There are a number of rural routes where constant maintenance is required due to heavy
traffic causing damage to roads of sub-standard construction. A survey undertaken on a
number of our C class routes established actual volumes of heavy traffic. It was determined
that the C80 (Whiskey Bond Road) experienced the highest volume at 27% HGV traffic,
compared to the other surveyed routes that had an average of 2%. High volumes of buses
and lorries were also noted on the C118 Routenburn Road (27%) and C41 Brisbane Glen
Road (20%) compared to an average of 16% over the 8 surveyed routes. Cars and light goods
vehicles accounted for only 55% of the vehicular traffic using the C80. This study highlighted
the need to determine appropriate treatment options for these routes to consider the type and
volume of traffic using them; or to look at alternative routes, if possible, for this traffic.
A programme of improvements to rural roads is ongoing to provide for more permanent
solutions to maintaining the road surfaces.
Rural roads are not designed or in a state to be used by heavy goods or large numbers of
vehicles. The C87 from Whitehurst Park to the A737 is a short cut used by residents and
haulage firms trying to avoid going through Kilwinning town centre. This has resulted in this
road requiring significant maintenance, further measures are being considered to reduce the
level of traffic choosing to take this rural route.
173

Page 174

Page 32 of 42
14. How assets will be used in the future
Local Transport Strategy
The Local Transport Strategy is currently under review and the updated document will help
improve the transport network in North Ayrshire and its connectivity beyond to create an
attractive place for businesses and communities to thrive. The new draft Local Transport &
Active Travel Strategy sets out the policies to be adopted and the actions to be implemented
to guide the planning and improvement of the local transport and active travel networks. It also
outlines behaviour change initiatives aimed at supporting and encouraging people to use the
sustainable transport networks more often. A detailed action plan identifies actions and
priorities for the period of the strategy. The new draft Local Transport & Active Travel Strategy
refers to all types of transport, including walking, wheeling, cycling, bus, rail, ferry and car and
considers how to integrate these types of transport to make travel by several modes easier for
all. The Local Transport Strategy may result in additional public transport and walking/cycling
routes that will result in increasing future maintenance costs.
North Ayrshire Council is committed to implementing low maintenance solutions, where
possible, for example widening existing footways to create shared footway/cycleways rather
than constructing separate new cycleways that would incur additional inspections costs.
174

Page 175

Page 33 of 42 
15. Performance Indicators 
The table below shows some of the main APSE/SCOTS performance indicators used to
measure performance of the roads assets. 
Performance Indicator 2019/20 2020/21 2021/22 2022/23 2023/24
(target)
RDS_PI010 - Percentage
of top priority winter gritting
routes completed on time
98.76 98.74 99.2 98.6 100
CP_20 (RCI) - % of overall
road network that should be
considered for
maintenance treatment
37.3 37.1 33.9 34.8 34.8
SOL_ENV04b - % of Class
A roads that should be
considered for
maintenance treatment
38.8 36.3 29.9 30.7 36
SOL_ENV04c - % of Class
B roads that should be
considered for
maintenance treatment
36.8 32.6 29.4 28.9 32
SOL_ENV04d - % of Class
C roads that should be
considered for
maintenance treatment
46.9 44.9 39.4 39.9 42
SOL_ENV04e - % of
unclassified roads that
should be considered for
maintenance treatment
33.7 35.6 33.9 35.4 37
RDS_PI008 - Bridge Stock
Condition Indicator
(average BSClav)
85.7 86.1 85.8 86.4 86.4
RDS_PI009 - Bridge Stock
Condition Indicator
(BSCIcrit)
75.3 75.6 74.2 74.8 75
OP_PL_LIGHT_01  -  %  of
lamps restored to working
condition within seven days
93.9 94.8 94.7 96 96
OP_PL_LIGHT_06a -
Average annual electricity
consumption per street light
(kw hours)
199.6 192 184.9 184.9 180
RDS_PI003 - % of street
lights which are LED
60.8 61.9 65 79.5 81
175

Page 176

Page 34 of 42 
The target for RCI % of road network that should be considered for maintenance treatment is
to maintain current road condition. The targets for the A, B, C and Unc roads are variable due
to the differences in survey timings and %s of each classification of road that are surveyed
annually. Road condition can deteriorate quickly as a result of inclement weather, subsidence
and material failures. 
Further performance information is reported through SCOTS/APSE to enable benchmarking
between authorities in Scotland and assist in sharing and learning through best practice. 
16. Action Plan 
Asset Management Plan Action Plan 
The following actions have been identified as the Road Asset Management improvement
actions and are recorded on Covalent. 
Action Ref Action Lead Timescale
RAMP_A02 Develop risk-based approach for
illuminated sign approval, produce
policy document for implementation
and assess impact and possible
requirement for committee
approval.
Lighting
Manager
March 2024
RAMP_A15 Review & Update Rural Lighting
Policy in respect of updated Arran
Plan and Legal comment
Lighting
Manager
March 2024
RAMP_A21 Assess NAC impact & policy for
illuminated sign reduction arising
from Risk Based guidance
Lighting
Manager
March 2024
RAMP_A22 Integrate Roads & Building
Services lighting operational and
financial management systems
Lighting
Manager
March 2024
RAMP_A23 Review & Update Road Lighting
Policy to incorporate guidance on
Non-Road Assets and other
services impacts”
Lighting
Manager
March 2024
RAMP_A30 Develop a programme for the
structural review and re-
assessment of bridges.
Team
Leader
Structures
March 2024
RAMP_A31 Review the results of bridge scour
assessments and create database
of scour risk.
Team
Leader
Structures
Ongoing
176

Page 177

Page 35 of 42
Action Ref Action Lead Timescale
RAMP_A32 Use coastal inspections to identify
and prioritise long term
maintenance requirements for
coastal assets.
Team
Leader
Flooding
March 2024
RAMP_A33 Undertake location surveys for
watercourses and review and
update the schedule of
watercourses in accordance with
legislative requirements
Team
Leader
Flooding
Ongoing
RAMP_A34 Assess the suitability of low carbon
road materials for use on the NAC
road network
Network
Manager
March 2024
RAMP_A35 Review the sustainability/lifecycle
of historical and current road
surfacing materials
Team
Leader
Asset
Management
March 2024
RAMP_A36 Option appraisal for inspection and
management of non-adopted road
network assets
Team
Leader
Asset
Management
March 2024
RAMP_A37 Prepare a proposal for the
removal/replacement of obsolete
flashing 20s outside schools
Team
Leaders
Network
March 2024
177

Page 178

Page 36 of 42 
17. Glossary 
The following abbreviations are used in this plan:
ACoP
ADC
AMP
APSE
BCI
BSClav
BSClcrit
CSS
DRC
GRC
HGV
IA
LCP
LTS
NRSWA
RAMP
RAUC(S)
RCI
RMS
SCOTS
SRMCS
SRWR
SPI
TRO
WDM
WGA
Approved Code of Practice
Annualised Depreciated Cost
Asset Management Plan
Association for Public Service Excellence 
Bridge Condition Indicator 
Average Bridge Stock Condition Indicator
Critical Bridge Stock Condition Indicator
County Surveyors Society
Depreciated Replacement Cost
Gross Replacement Cost
Heavy Goods Vehicle
Improvement Action
Lifecycle Plan 
Local Transport Strategy 
New Roads and Street Works Act
Road Asset Management Plan
Roads Authorities and Utilities Committee (Scotland)
Road Condition Indicator
Roads Management System 
Society of Chief Officers of Transportation in Scotland
Scottish Road Maintenance Condition Survey
Scottish Road Works Register
Statutory Performance Indicator
Traffic Regulation Order
Williams Detail Management Limited 
Whole of Government Accounts
178

Page 179

Page 37 of 42 
The following terms are used in this plan:
Annualised
Depreciation
Asset
Management
The cost of annual deterioration of the road network if no
maintenance works are carried out.
A strategic approach that identifies the optimal allocation of
resources for the management, operation, preservation and
enhancement of the Road infrastructure to meet the needs of
current and future customers.
Asset Valuation The calculation of the current monetary value of an authority’s
assets.
Depreciation The systematic allocation of the depreciable amount of an
asset over its useful life arising from use, ageing, deterioration
or obsolescence.
Depreciated
Replacement
Cost
Method of valuation which provides the current cost of
replacing as asset with its modern equivalent asset less
deductions for all physical deterioration and all relevant forms
of obsolescence and optimisation. 
Gross
Replacement
Cost
Levels of
Service
The monetary cost of replacing the existing asset with a
modern equivalent asset. 
A statement of the performance of the asset in terms that the
customer can understand. 
Lifecycle Plan Document defining the standards applied to an asset  and
detailing the management processes used to deliver those
standards.
Public Realm Publicly owned streets, pathways, right of ways, parks, publicly
available open spaces; all areas to which the public has open
access 
Road
Infrastructure
Assets 
Section 7
Agreement 
Statutory
Undertakers
An authority’s portfolio of road assets including roads,
segregated footpaths and cycle routes, structures, lighting,
traffic management systems, etc. Together they function as a
system or network which as a whole is intended to be
maintained at a specified Level of Service (assessed through
performance measures) by the continuing replacement and
refurbishment of its assets and elements.
A Roads Authority and Scottish Water may agree to the
provision, management, maintenance or use of their sewers or
road drains for the conveyance of water from the surface of a
road or surface water from premises and that neither party shall
unreasonably refuse to enter into such an agreement or insist
on terms or conditions unacceptable to the other party.
Various companies and agencies with legal rights to carry out
works on the road.
179

Page 180

Page 38 of 42 
18. Appendix A – Maintenance Hierarchy Mainland & Cumbrae 
Strategic 
Main Distributor
Secondary Distributor
Link and Access Roads 
180

Page 181

Page 39 of 42 
19. Appendix B – Maintenance Hierarchy Arran 
Strategic 
Main Distributor
Secondary Distributor
Link and Access Roads 
181

Page 182

Page 40 of 42 
20. Appendix C – Carriageway Prioritisation Criteria 
The annual carriageway resurfacing programme is developed using WDMs UKPMS Scheme
Manager software. 
This takes into consideration the following data when determining prioritisation of
carriageways for inclusion in the works programme. 
The following road condition data sources are used:
• Scottish Road Maintenance Condition Survey Data
• RoadAI Condition Data
• SCRIM 
Primary condition data sources utilised for each classification of road are:
A, B & C roads are using SRMCS
U class are using RoadAI 
Local Rankings are also included:
• Accident Data
• Road Hierarchy
• Defects 
Scheme Manager produces a prioritised list of carriageways in need of maintenance
treatment. This includes a determination of the most efficient treatment type i.e. surface
treatment, thin surface or inlay/overlay, taking into account its condition and lifecycle.
The outputs from Scheme Manager are then compared to the Locality Inspectors annual
Condition Assessments to identify any areas that may not have been highlighted through
this process.
182

Page 183

Page 41 of 42
21. Appendix D – Footway Priority System
183

Page 184

Page 42 of 42
22. Appendix E – Structures Priority System
Structure Name:
Date when the scoring is carried out: Structure Name:
Structure Net score % of
Maximum Score total Score
No. Factors Score Input Additional comments
1
Type of Bridge 1 Score 1 if road bridge and 0
if foot bridge
Culverts, Subways which carry road shall be
considered as road bridge as per this scoring
system. Structures which carry only pedestrians,
cyclists and equestrians shall be considered as
footbridge.
1
NA
2 Route Factor 40 Score based on NAC route
hierachy
Route hierachy 0 0 0%
Cat 2 - SPT/ NAC strategic routes - 40
Cat 3a - Main distributor routes - 30
Cat 3b - secondary distributor routes - 20
Any other category - 10
Routes serving fewer than 5 properties - 5
3 HGV Restriction 20 Score based on weight capacity Weight restriction 0 0 0%
factor 3 tonnes - 20
7.5 to 13 tonnes tonnes - 15
18 tonnes - 10
26 to 38 tonnes - 5
No weight restriction - 0
4
Condition factor 10 Score based on the condition of
the bridge
Sliding score based on 0 for very good condition
to 10 for poor condition. (10 - (BCI crit/ 10)) 0 0 0%
5
Deterioration
factor
10 Score based on the rate of
deterioration of the structure
Sliding score based on 0 for very slow
deterioration to 10 for rapid deterioration 0 0 0%
6
Pedestrian
factor
30 Score based on pedestrian usage.
Bridges with footways of heavy
pedestrian usage shall score a
maximum of 30.
Structures with footways in heavily used urban
areas score 30. Score 30 if route is access to a
school or railway station. Apply a sliding scale
going down to 0 for rural structures without
footways.
0 0 0%
7
Flooding factor 40 Score based on the potential for
the existing structure to
contrubute to flooding
A structure that makes no contribution to
flooding risk will score 0. Structures that are
know to increase the risk of flooding due to
restrictions in width or soffit height will score 30.
0 0 0%
8
Scour factor 60 Score based on risk of collapse
due to expose to scour in heavy
flow conditions
Risk of collapse of structure due to scouring.
Structures which have been deterioted severely
because of inadequate scour protection and on
verge of collapse score maximum. Scour risk
based on a sliding scale.
0 0 0%
9
Parapet Condition
Factor
15 Score based on the condition of
the parapets
Structures with substandard Parapets with poor
conditon will score 15 . Structures with
substandard parapets with a 'monitor only'
recommendation will score 10. Structures which
have parapets to current standards will score 0.
0 0 0%
10
Parapet Risk
Factor
10 Score based on risk in the event
of a parapet collapse leading to
high risk injuries and human
casualties.
What is the likelihood of someone getting high
risk injury or even death while the parapet is
open to use considering the condition of the
structure. Risk based on a sliding scale. 0 -5 100%
11
Delay factor 20 Score based on whether existing
restrictions such as limited width
cause delays at the structure
Structures where delays are caused by width,
weight, height or other restrictions such as
traffic lights will be given a score higher than
zero. Delays less then 2 minutes at peak times
will score 10 and longer than 2 minutes will score
20. Score maximum if fire station, railway station
or hospital affected by delay.
0 0 0%
12
Structure Risk
factor
10 Score based on risk in the event
of a Structure collapse leading to
high risk injuries and human
casualties.
What is the likelihood of someone getting a high
risk injury or even death while the structure is
open to use considering the condition of the
structure. Risk based on a sliding scale.
0 0 0%
13
Maintenance
factor
30 Score based on maintenance
required to keep the existing
structure open.
Score based on known maintenance history and
requirement. No maintenance requirement will
score 0. Listed structures score 15. 0 0 0%
14
Diversion factor 20 Score based on the length of the
diversion route if the structure is
closed in an unplanned manner
with no finite time limit.
Score based on diversion length. Any diversion
equal to or more than 20 miles scores 20. Score 1
for each mile of diversion up to 20. Score 20 if a
road closure adversly affects a fire or railway
station or hospital. Score 20 if there is no
alternative diversion. 
0 0 0%
-5
184

Page 185

Page 43 of 42 
Note maximum score that can be achieved for road bridge= 500   
Priority level Chart Structure Name:         
Date of Scoring: 00-Jan-00       
Priority Level Indicator  Overall works (500) Structure works (100) Parapet works (70) Scour Protection (60) 
Level Score Level Score Level Score Level Score 
No Action Rquired          
Low Priority          
Medium Priority          
High Priority          
Immediate action required                     
Note : Works are divided above into three sub categories as each work can be independent and 
each has its own significance in terms of attention required.   
185

Page 186

1 
ASSET MANAGEMENT PLAN 
FLEET
186

Page 187

2
1. Introduction
The Council operates over 500 vehicle and road registered items of plant, with a replacement
value of £27.98 million, along with a large number of other plant and machinery to support the
delivery of services. Assets are primarily maintained in the Council’s workshops at Kilwinning
and Arran supported by specialist external contractors where required. The cost of operating
and maintaining the assets including fuel use is currently £4.82 million per year. These assets
are supplemented by both externally hired assets to meet long-term specialist needs or short-
term business needs accounting for approximately £0.38million annual expenditure.
The Kilwinning workshop is a DVSA (Driver and Vehicle Standards Agency) approved MOT
testing station for classes 4 (cars, light vans, and passenger vehicles of up to 12 seats), 5
(passenger vehicles with more than 13 seats) and 7 (goods vehicles up to 3500Kg Designed
Gross Weight) and operates a tachograph calibration and repair facility.
A two-shift working arrangement is in place to enable operational availability of the workshop
from 0630hrs to 1800hrs; this pattern maintains the capacity of the service during the core day
whilst supporting the daily requirements of fleet users. These arrangements are also
complemented by mobile mechanic arrangements as appropriate. The Arran workshop is
available from 0800hrs to 1630hrs.
Operation of Large Goods Vehicles is controlled through a regulatory regime enforced by the
Traffic Commissioner through an ‘Operator’s Licence.’ The Transport Manager is the qualified
holder of the ‘Operator’s Licence’ for the Council and has responsibility to ensure that all
vehicles and drivers operate within the legislative and safety requirements of the conditions
and undertakings imposed by the Traffic Commissioner.
2. Aims & Objectives
This Fleet Asset Management Plan identifies how it will contribute to achieving the Council’s
vision ‘To be a North Ayrshire that is Fair for All’ and mission statement “Working together
to improve well- being, prosperity and equality in North Ayrshire.”
The effective allocation, utilisation, and operation of a well-maintained, fuel-efficient vehicle
asset fleet, contribute towards many of the deliverables across all Council services which
include:
• Wellbeing
• Communities & Local Democracy
• Climate Change
• A Sustainable Council
•
Effective management of fleet related assets is critical to the delivery and performance of
Council services. This Fleet Asset Management Plan sets out and controls the management
of the Council’s fleet related assets. Our vision is to provide effective fleet procurement,
management, and a workshop maintenance service, enabling our users to deliver safe,
reliable, and cost-effective services to our communities, with a commitment to significantly
reducing our reliance on fossil fuels and to make our assets environmentally sustainable.
The objectives of the Fleet Asset Management Strategy are:
187

Page 188

3 
• Assets fit for purpose - All vehicles/plant and equipment will be ‘fit for purpose’ in terms
of condition and suitability for the intended use.
• Safety - The vehicle/plant or equipment must secure the minimum health and safety
risk to our staff and members of the public.
• Assets used effectively – Assets will be treated as a corporate resource, and the need
to own/maintain the vehicles/equipment will be regularly challenged with users and the
performance of assets will be monitored and reported with the aim of eliminating
unnecessary expenditure.
• Sustainability - Assets, which run efficiently, maximise value for money, are
environmentally and energy efficient contributing directly to delivering reductions in
carbon emissions inclusive of the environmental life cycle of the vehicle and
component parts (including fuel). This links directly to our Council Plan climate change
priority. 
In meeting these aims the Transport Hub commits to: -
• Collaboration with stakeholders to identify additional value from the standardisation of
vehicles and equipment across North Ayrshire Council.
• Provision and maintenance of a modern vehicle fleet that is fit for purpose and fully
supports the delivery of front-line services.
• Ensuring Council Services have the appropriate vehicles to carry out their
responsibilities and duties.
• Demonstrating Best Value.
• Considering the needs of Stakeholders.
• Ensuring Fleet Asset Management information and data is collected and stored
effectively within its Fleet Management System (Fleetwave).
• Ensuring vehicles are maintained to DVSA (Driver and Vehicle Standards Agency)
standard.
• Undertaking safety inspections (currently annual for vehicles under 3500kg and every
eight weeks for vehicles over 3500kg as defined by the terms and conditions applicable
to our Operators Licence) to ensure vehicles are fit for purpose, kept roadworthy and
comply with Construction & Use Regulations.
• Providing in-house Class IV, V & VII MOT facility by DVSA trained mechanics.
• Using approved and calibrated inspection equipment. 
3. General Description
The Council operates a fleet of 557 vehicles and plant registered for the road along with many
other plant and machinery to support the delivery of services. The permanent vehicle fleet is
supplemented by 125 short-term hired assets to meet fluctuations in business activities, such
as the Car Club and seasonal work within the Streetscene Service or short- term contracts
within Building Services and Care at Home. 
A planned preventative maintenance and inspection schedule is in place at periods ranging
from eight weekly to annually, depending on the type and use of each vehicle. This is
supported by a daily reporting system to identify any defects before vehicles are used to
ensure roadworthiness. All repairs are documented to ensure that works carried out on Council
vehicle assets are recorded to enable effective asset management and to ensure that
throughout the vehicle’s life it is maintained in a safe, legal, and roadworthy condition. 
The Transport Hub is an accredited Van Excellence operator which is a scheme designed by
some of the best van operators in the UK and facilitated and managed by Logistics UK to
188

Page 189

4
recognise excellence and improve operational standards. At its heart is the Van Excellence
Code which is a code of practice outlining ‘what good looks like in van operations.’ This helps
ensure that the Council continue to operate to nationally recognised best practice standards.
3.1 Asset Types
Asset Type Number of Assets % of Fleet
Passenger Vehicles 80 14.0%
Minibuses 18 3.2%
Bus 8 1.4%
Large Goods Vehicles over 3500Kg 74 13.3%
Compact Sweepers 12 2.2%
Vans and Tippers up to 3500Kg 282 51.0%
Road Registered Plant 83 14.9%
Total 557
4 Current Performance/Drivers for Change
There are several influences that will impact upon the future requirements and use of the fleet
assets that need to be considered including: -
 National commitments for reduction of transport emissions have been made, with the
2019-2020 Programme for Government committing to phase out the need for any new
petrol and diesel light commercial vehicles by 2025 and to create the conditions to
phase out the need for all new petrol and diesel vehicles in Scotland’s public sector
fleet by 2030.
 The Council’s commitment to achieve net zero carbon emissions by 2030.
 The Council’s Transformation programme seeks to review the current methods of
delivering services to ensure that the Council can still deliver high quality customer
focused services within reduced financial resources. Many of the Council’s services
utilise fleet assets to support their delivery.
4.1 Increasing Fleet Utilisation and Transport demand management
Though the introduction of telematics it is possible to access and manage real time information
on the utilisation and efficient use of the vehicle fleet. This ensures that vehicles are being
used and driven as efficiently as possible. The information enables the Transport Hub to
engage with services and jointly manage demand for vehicles, with the aim to reduce the miles
driven, look at whether trips are necessary, and consider if they can be combined or whether
the optimum routes are being used.
The reviewing of efficient vehicle use will ensure that vehicles are being used as efficiently as
possible and using the least amount of fuel. The key areas here are driver performance and
vehicle maintenance, as both have a significant impact on fuel. The effective deployment and
189

Page 190

5
analysis of the telematics data will help support the review by evidencing the demand for
vehicles and key areas where we can optimise the utilisation across the fleet.
4.2 Service Transformation
To meet the financial challenges facing the Council, services are subject to fundamental
review. Where services utilise transport within their delivery it is expected that reviews will
seek to utilise this more efficiently. This may impact upon areas including number or type of
vehicles, the need for transport and hours of operation.
4.3 Sustainability
The Scottish Government has set out an ambition to phase out the need for any new petrol
and diesel light commercial vehicles by 2025 and to create the conditions to phase out the
need for all new petrol and diesel vehicles in Scotland’s public sector fleet by 2030.
The need for public sector leadership is key to realising this ambition. The Transport Hub faces
a challenge as it aims to reduce environmental impacts through a combination of cleaner
vehicles and fuels, fuel-efficient operation, and driving; and by reducing the amount of road
traffic it generates. To get to the point where ULEVs can be acquired and deployed into the
Councils fleet successfully, the infrastructure needs to be ready. The Council are already
forging the way with workplace charging options. The team continue to successfully engage
with the Switched-on Fleet initiative, facilitated by Transport Scotland and The Energy Savings
Trust. This initiative offers grant funding which can be used towards the procurement of
Workplace Chargers and associated infrastructure.
4.5 Car Club
The Council’s pool car scheme was successfully re-launched during 2022/23 with an aim to
reduce carbon emissions and expenditure associated with staff business travel. Over 1,500
members of staff have signed up to the scheme, with access to 11 low emission vehicles and
four EV’s across seven Council office locations. Our aim is to expand the club’s EV capacity
which will further reduce emissions and expand the scope to increase workplace chargers to
support these within the scheme.
4.6 Business Development / Commercialisation
Commercialising opportunities now forms part of all future business developments of the
Transport Hub, this will include promoting the use of the pool of fleet vehicles and drivers,
maximising the potential use of the Councils MOT test centre and maintenance facility, the
provision of certified driver training and review opportunities for shared services with other
public-sector bodies.
4.7 Vehicle Advertising
All commercial and light commercial vehicle fleets carry the Council’s corporate
branding/colours and logo. The Council’s distinctive fleet are highly visible throughout North
Ayrshire and is a highly effective channel for outdoor advertising. It is now standard practice
to use these vehicles to promote Council events, services, and campaigns, reducing the need
for other forms of outdoor advertising.
5 Condition and Suitability
190

Page 191

6 
The Transport Hub provides and maintains vehicles for a range of Council services as set out
in the table below: 
Service Area Owned Vehicles Hired Vehicles Electric Vehicles
Building Services 111 32 2
Roads and Transportation 39 6 0
Streetscene 98 8 5
Waste Management 49 7 2
Facilities Management 26 7 11
Educational Resources 10 0 0
PMI 1 0 1
Social Services 113 65 0
Corporate Services 1 0 1
Transport 61 0 25
Total 510 125 47 
A well-maintained vehicle fleet provides a positive image of the Council to the public and
minimises service disruption attributable to breakdowns and associated re-active maintenance
and ensures compliance with the appropriate regulatory frameworks. Getting the most out of
vehicles over a longer period of time and the key aim to maximise the use of each vehicle,
maintain regulatory compliance and wherever possible extend its useful life beyond initial
planned parameters. 
Planned Maintenance
A planned preventative maintenance and inspection schedule is in place at periods ranging
from eight weekly to annually depending on the type and use of each vehicle. In addition,
having an effective way to report defects is a key part of the Councils vehicle maintenance
regime. A ‘nil defect’ reporting system is in place whereby drivers must undertake a range of
vehicle safety checks and complete pro-forma to confirm roadworthiness before use.
Vehicle Checks
A ‘nil defect’ reporting system is in place whereby drivers must undertake a range of vehicle
safety checks and complete pro-forma to confirm roadworthiness before use. Where safety
critical defects are identified, a replacement vehicle must be used until the transport service
has completed the appropriate repair.
Technology
All Large Goods Vehicle are now specified to have lane assist and AEBS (advanced
emergency braking system) fitted as standard. All vehicle technological advancements are
being reviewed as they become available on the marketplace for the possible inclusion in our
future vehicle purchasing specifications. 
All vehicle inspections, repairs, servicing works, and fuel use are recorded using the
proprietary ICT fleet management system (Fleetwave) to establish the whole life costs of each
asset. The Fleetwave system ensures that information can be accurately recorded and utilised
to inform future asset management and purchasing decisions.
Telematics have been installed into most fleet vehicles which reports on vehicle usage and
driver behaviours this technology allows the Transport Hub to easily capture the necessary
data to establish exactly how the fleet is being utilised and where improvements can be made.
191

Page 192

7
Driver Training
Provision of core driver/operator training is undertaken by our in-house Fleet Compliance
Team. This training has been developed to fulfil our health and safety responsibilities, statutory
duty and to provide staff with the skills they need to undertake their roles. We are a Joint
Approvals Unit for Periodic Training (JAUPT) accredited training centre this enables us to
deliver Driver Certificate of Professional Competence training straight to our teams and in a
way that ensures as little disruption to services as possible. We also have a qualified
instructor/assessor accredited to RTITB Road Transport Industry Training Body for delivering
plant and machinery training.
Driver licence checks are carried out every six months for all fleet asset drivers to ensure the
staff members continue to hold the required category for the type of vehicles they drive.
6 Sufficiency
Use of Assets
Transport assets are utilised by the Council to assist or facilitate the delivery of services to the
whole or part of the community, businesses, and visitors. Examples include: -
 Collection of Waste and Recycling from households and businesses;
 Cleaning of Streets and maintenance of public land and open spaces;
 Maintenance and repair of homes for Council tenants;
 Winter maintenance and repair of roads;
 Transportation of school children;
 Care at home and welfare services for elderly and vulnerable members of the
community:
 Provision of hub and spoke catering facilities for school meals.
Vehicle drivers, passengers and other users are consulted to ensure we are well informed and
that we capture the key requirements needed for securing a fleet that is fit for purpose. These
groups are users of the fleet assets, and their operational knowledge and experience is
important in ensuring the procurement of replacement assets focuses on the right
requirements. This also empowers users in determining better options.
Lifetime Performance
Pressure on the Councils fleet budgets and a desire to optimise vehicle utilisation has led to
an increasing focus on making vehicles work longer, harder and smarter. However, simply
extending the mileage or length of time for which a vehicle operates is not necessarily the best
way to run an efficient fleet.
Rather than implementing a fixed vehicle replacement cycle across the fleet, the Transport
Hub looks at a wide number of parameters such as operational measurements, by
interrogating an individual vehicle’s data, the team may find that some vehicles are best
replaced after a different period. This type of enhanced vehicle replacement forecasting
involves the Transport Hub assessing data about specific vehicles, in order to identify
inefficient and costly vehicles for disposal or to retain vehicles that are performing more
efficiently.
7. Financial
7.1 Annual Revenue Costs
192

Page 193

8 
The annual revenue cost of maintaining and operating the vehicle and road going plant items
is currently £4.82 million of which £3.06 million is attributable to fleet management and
maintenance and £1.76 million to fuel.
7.2 Service Level
The centralised Transport Hub, which incorporates, Fleet Compliance, Maintenance and
Journeys teams allows a more corporate and strategic approach to the management of the
supply and demand for transport across services. The Hub manages all the Councils
consolidated transport related budgets. The cost of transport provision is allocated to services
annually based on their specific requirements. Management information regarding vehicle
costs and usage is also available to users in a form and timescale that enables appropriate
management interventions in respect of use and deployment. The mechanism aims to provide
greater transparency and control in the allocation of costs to services in operating vehicles by
allocating costs in the following ways: -
 An annual fixed fleet management charge per vehicle in respect of the fixed costs and
overheads of service provision;
 A fleet service charge for each vehicle based on planned maintenance and operating
cost along with reasonable levels of wear and tear;
 Re-charge of actual costs incurred for repairs undertaken arising from unreasonable
or inappropriate use of a vehicle thereby enabling appropriate management
intervention;
 Fuel recharges are based on actual consumption by each asset;
 Re-charge of actual contract costs for taxi and plant hire provision. 
7.3 Capital Investment
Assets are currently purchased outright through the Council’s capital programme. Whilst
capital financing can be secured this is the preferred method of purchase as it provides
maximum flexibility and control in the use and lifecycle of the assets. However, the decision
to finance assets will be reviewed on a regular basis to ensure that the most appropriate
method is utilised in response to developments within financial markets.
The Council has replaced 434 vehicles at a capital cost of £13.97 million over the past eight
years as set out in the table below. 
Year Number of Vehicles
Replaced
Replacement Cost
(£)
2015/16 92 1.99m
2016/17 54 2.03m
2017/18 61 2.08m
2018/19 97 1.84m
2019/20 37 1.04m
2020/21 52 2.04m
2021/22 29 1.48m
2022/23 12 1.47m
193

Page 194

9 
Total 434 13.97m 
The estimated asset replacement costs together with allocated Capital funding are set out in
the table below for each of the next 8 years. The forecast costs include for vehicle
replacements based on 2030 target date to decarbonise the 397-vehicle fleet currently suitable
for the transition to alternative fuelled vehicles. 
Year Estimated Replacement Costs
(£)
Capital Programme
(£)
2023/24 3.26m 3.36m
2024/25 2.84m 1.02m
2025/26 3.66m 2.00m
2026/27 4.90m 2.98m
2027/28 3.62m 2.00m
2028/29 3.44m 2.00m
2029/30 3.35m 2.00m
2030/31 2.88m 2.00m
Total 27.98m 17.36m 
The profiling of the above illustration is based on a decarbonisation model undertaken which
considered remaining lifespan of current combustion vehicles, the need for a managed
approach, and the lead-in time for vehicle charging investment.
The value of the capital programme during this period is significantly less than the replacement
value due to an increase in today’s purchase costs for alternative fuelled vehicles and the
relevant infrastructure.
It is estimated that the total capital funding required to replace all 397 vehicles suitable for low
emissions alternatives alone to be is £15.85m (which includes both vehicle replacement and
assumed charging costs), based on today’s prices, this equates to a 100% (£7.92m) increase
in costs compared to ICE (Internal Combustion Engine) vehicles. The figure also excludes
those 160 vehicles which do not currently have a cost-effective solution.
The ability of the Council to decarbonise the fleet in the short to medium term will be
particularly challenging. However, the estimated figures may change due to ongoing
Transformation Projects and Service reviews which may impact upon the number of vehicles
required in the future. Further information is provided at section 13 below.
7.4 Expiry
The vehicle replacement plan identifies the anticipated lifespan to enable accurate financial
planning. However, to maximise the value of each asset replacement is made on a condition
basis or a notable change in user requirement. To extend their life vehicles may be transferred
194

Page 195

10 
to other services, utilised within the central transport pool to reduce the need for hire vehicles
or used to replace a vehicle that is no longer economically viable.
Capital funding for fleet replacement vehicles was reduced by 25% over the past 5 years
(£2.5m), this had a significant impact on the revenue budgets due to maintaining the assets
over a longer period which resulted in additional down time and reduced vehicle reliability.
We are also likely to see an increase in the length of lead time for vehicles for all fuel types,
but more so for alternatively fuelled vehicles, which have an increasing demand and smaller,
more expensive, production runs. Improved planning for replacement cycles for vehicles is
therefore essential.
7.5 Disposal
At the end of their useful life with the Council vehicles are disposed of through an auction
house or directly to specialist dealers ensuring that the best price is attained. Vehicles which
are deemed to be beyond any use at end of life will be disposed of through recognised
accredited vehicle dismantlers. Such receipts are not expected to exceed £100,000 annually
and are returned to the Council’s capital fund.
8. Legislation 
There is an extensive regulatory regime in place regarding the provision and operation of the
assets which in the case of Large Goods Vehicles is enforced by the Traffic Commissioner. 
An operator's licence (or O licence) is the legal authority needed to operate goods vehicles in
Great Britain. The licence is issued by the Traffic Commissioner – the independent regulator
of the commercial road transport industry; a Traffic Commissioner also has powers to take
regulatory action against a licence holder where they fail to meet the expected standards of
operation. The Transport Hub acting as the Councils,fleet operator must ensure compliance
and relevant process are in place. 
When planning for fleet provision, cognisance of the following legislative requirements is
required:
• Operator’s Licence (Goods Vehicle – Licensing of Operators) Act 1995
• Construction and Use Regulations 1986
• Vehicle Lighting Regulations 1986
• Driving Licences Regulations 1999
• The Road Traffic Act 1991
• Registration and Licensing Regulations 1971
• The Health and Safety at Work Act 1974
• The Management of Health and Safety Regulation 1999
• Provision and Use of Work Equipment Regulations 1998
• Lifting Operations and Lifting Equipment Regulations 1998
• The Climate Change (Scotland) Act 2009 
9 Policy/Guidance
Council Plan
195

Page 196

11 
This Fleet Asset Management Plan identifies how it will contribute to achieving the Council’s
vision ‘To be a North Ayrshire that is Fair for All’ and mission statement “Working together
to improve well- being, prosperity and equality in North Ayrshire.” 
This Asset Management plan outlines our key priorities for the next three years and details
how the Fleet asset will support our people to deliver these. This plan also gives an overview
of our key actions and the performance indicators that we will use to measure how well we
are meeting the needs of the communities we serve.
The effective allocation, utilisation, and operation of a well-maintained, fuel-efficient vehicle
asset fleet, contribute towards many of the deliverables across all Council services which
include:
• Wellbeing
• A Sustainable Council
• Climate Change 
10 Health and Safety
All vehicles and equipment must be fit for purpose and need to be managed effectively to
support our services and ensure the health and safety of staff, customers, and the wider
community.
The provision of fleet vehicles and plant which are fit for purpose and provide both an
efficient and safe working environment by meeting all the requirements of our Operator’s
Licence and satisfies all Health & Safety, Legislative and Statutory requirements.
11 Risk Management
There are several inherent risks in the operation of the assets and their provision to service
users. These risks are assessed utilising an impact and likelihood matrix to establish the extent
of the risk and to inform the actions required to mitigate the risk to a level such that operations
can be maintained to an acceptable level. 
Key Risks 
Risk
Likelihood
Rating (A)
Impact
Rating
(B)
Risk
Score
(A + B) 
Consequence  Current Controls 
Extension of
asset beyond
economically
viable life  3  3 
9
 Service disruption
due to increased
breakdowns
 Increased
maintenance costs
 Loss of
‘Operators’
Licence 
 Planned Maintenance
programme
 Timely replacement
programme 
Loss of
‘Operators’
Licence 
3 3 
9  Cannot utilise
transport to deliver
services
 ‘Nil’ defect daily
checklist to be
completed prior to
vehicle use
 Planned maintenance
and inspection cycle
196

Page 197

12
 Driver training
programme
Increased
environmental
controls in
respect of
vehicle
emissions 3 2
6
 Fleet does not
meet legislative
standards
 Cannot utilise
transport to deliver
services
 Increased costs to
hire in
appropriately
compliant
vehicles.
 Timely replacement
programme
 Evaluation of
alternatively powered
vehicles
 Planned maintenance
programmes to ensure
optimum efficiency in
vehicle operation
Significant
increase in
Price of Fuel 3 2
6  Increase in budget
requirement
 Speedy implementation
of alternatively powered
vehicles
 Securing of bulk supply
contracts
Securing of Fuel
Supply
1 5
5
 Essential Services
cannot be
delivered
 Maintain bulk supply
 Work with Ayrshire Civil
Contingencies Team to
maintain contingency
plan
 Increase the number of
alternatively powered
vehicles to reduce
demand
Insufficient
capital funding
to support the
decarbonisation
of the fleet
3 3
9
 Not meeting the
Scot Gov target
 Increase in
revenue costs due
to retaining
vehicles longer
 Low staff moral
 Increase of vehicle
downtime
 Early engagement within
service reviews
impacting on transport
 Replacement plans re-
phased to significantly
reduce number of
vehicles being replaced
Effective management and the implementation of actions set out within this plan will enable
these risks to be mitigated and an early warning should further interventions be required.
12 Governance of the assets
12.1 Plan Management
The Head of Sustainability, Corporate Property & Transport is responsible for management
and control of the plan, and the Transport Manager is responsible for its implementation.
12.2 User Input
The assets are provided to enable or facilitate the delivery of a range of Council services. The
requirements of services in the utilisation of these assets, particularly in respect of demand
profiles, vehicle specification and future service development, is collated and agreed and in
turn forms an integral part of the asset management plan and its continued development.
12.3 Elected Members
197

Page 198

13 
This Fleet Asset Management Plan will be presented to Members as a component of the
overall Corporate Asset Management Plan.
12.4 Plan Review
The plan will be reviewed annually as part of the Council’s service planning and budget setting
exercise and in response to planned changes within the delivery of Council services.
13 Service Delivery Aspirations/Challenges 
National commitments for reduction of transport emissions have been made, with the 2019-
2020 Programme for Government committing to phase out the need for any new petrol and
diesel light commercial vehicles by 2025 and to create the conditions to phase out the need
for all new petrol and diesel vehicles in Scotland’s public sector fleet by 2030. 
As part of our ambition to achieve net zero carbon emissions by 2030, work is already
underway in support of transitioning to zero-emission fleet vehicles and progress has been
made in terms of investment in both EVs (Electric Vehicles) and charging infrastructure. 
13.1 Avoiding the need to travel
The Council’s fleet is engaged in essential service delivery, with a need to travel. However,
there may be opportunities to reduce travel demand, including through digital service delivery
and journey planning for essential travel.
In terms of staff business travel, we continue to promote sustainable travel and employees
are reminded to select the best option to meet their business travel needs. The sustainable
travel hierarchy encourages staff to choose the most appropriate solution with the lowest CO2
impact. Staff should continue to be encouraged to choose travel options as close to the top of
the hierarchy as possible.
13.2 Rationalise the current fleet
Fleet rationalisation is the process of reducing the size of the fleet to ensure that each vehicle
is used as efficiently as possible. This involves examining the usage of each vehicle and
removing any vehicles that are excess to requirements, reallocating vehicles within the fleet,
and downsizing vehicles. This can provide cost (revenue and capital) and carbon savings as
vehicles are optimised and less vehicles overall need to be leased, purchased, and
maintained.
The Transport Hub Team continue to critically review the fleet, this has been carried out over
two phases with an aim of rationalising, downsizing, and electrifying the current fleet where
possible.
The work of the team contributed to the provision of a wealth of baseline fleet data and
background in support of the ongoing Fleet Decarbonisation work and continue to provide
valuable support throughout the review and the development of the Decarbonisation of Fleet
Working Group.
At each replacement opportunity the team consider in consultation with the relevant service
whether a vehicle is still required, or if it can be downsized through reviewing operational
requirements, carrying capacity and number of seats required. Fleet rationalisation is therefore
a continual part of our fleet management activity.
198

Page 199

14 
The Team continues to support frontline service reviews, this can include service redesign or
transformational projects which can result in a reduction in the number of fleet vehicles.
13.3 Use of Telematics
The Council operate a telematics system which is installed in all fleet vehicles.
The telematics system provides decent quality fleet data which is an essential component to
successfully implement zero emission vehicles. The most principal factors to consider when
we are selecting a ZEV (Zero Emission Vehicle) replacement is the daily mileage and
maximum range required, and the opportunities for recharging (usually overnight but also
during the day).
The telematics data is used to help identify potential locations for charging sites. The data
highlights the locations where vehicles are stationary during the day and night along with the
duration that they are stationary for, thereby pinpointing potential locations for charging
infrastructure.
The data is also used to identify vehicles which are underused. This helps inform our fleet
rationalisation decisions, over whether some vehicles can be removed from fleet, or whether
additional work can be put on them to make them more effective.
Overall, our telematics system provides us with a clearer picture of how the fleet is currently
being used. This data will make the process of transitioning the fleet to ZEV’s (Zero Emission
Vehicles) easier, as we can match zero emission technology with vehicles, and accurately
plan our charging infrastructure.
13.4 Switch to low carbon alternatives
Creating a 100% zero-emission fleet will require the replacement of our current vehicles with
a mixture of different technologies. Currently most ZEVs (zero emission vehicles) are battery
electric vehicles (BEVs) but there are also hydrogen options available.
The current fleet includes a range of vehicles intended to serve varying purposes, meaning
that some vehicles would be more suited to switching from conventional fuels to electric than
others. Given the current average range limitations of EV batteries, Council vehicles which
currently travel less than 100 miles per day would have the best potential to switch to electric,
397 vehicles have been identified as being immediately suitable to be replaced by electric
vehicle (EV) alternatives. 
Progress has already been made in relation to acquisition of electric vehicles and we currently
operate 47 EVs, which equates to 11.8% of the 397 vehicles noted above. However, this figure
will change as vehicles reach the end of their contract agreement and returned to the leasing
company. The numbers will continue to fluctuate depending on both lead times and securing
sufficient budget for replacements. 
Nonetheless, the purchase of new passenger and Light Commercial Vehicles (LCVs) will be
zero emission vehicles only, two years ahead of the 2025 target to phase out acquisition of
petrol and diesel versions of such vehicles by public bodies.
To inform how we decarbonise other plant (e.g., tractors), the Scottish Government are
undertaking analysis on the ‘Decarbonisation of mobile agricultural machinery in Scotland.’
This will shape the policies to be developed as part of the upcoming Climate Change Plan.
13.5 Charging Infrastructure- Workplace
199

Page 200

15 
In parallel with ZEV adoption, the Council must plan for, and install, suitable charging
infrastructure to support our expanding electrified fleet. This will require a mixture of workplace
and home-based charging, as some vehicles are stored on Council premises overnight, and
others are taken home.
The Council has set a target through its Electric Vehicle Strategy (2021-2025) to have 80
workplace charge sockets (44 charge points with varying number of outlets) in place by
December 2025.
As of June 2023, the Council have installed 29 dedicated workplace chargers (65 sockets) to
support the decarbonisation of our fleet vehicles. These have been funded through the
Switched-on Fleets programme which is solely used in support of charge point infrastructure
for fleet vehicles.
The Decarbonisation of Fleet Working Group will continue to review the Council’s non-
domestic buildings and fleet mileage data to identify further opportunities to install workplace
charge points.
The key things to be aware of when designing and implementing a robust charging
infrastructure are:
• Site constraints - such as the available site electrical capacity and current site demand
• The duty cycles of vehicles based at the site - how much time they have available to charge
• The daily mileage requirement of the vehicles based at the site
• The energy requirement of the vehicles based at the site
The new generation of EVs boast a significant range on a single battery charge, and there is
unlikely to be a requirement for a ratio of one charger per vehicle. An EV with a 200-mile range
and a daily route of 40 miles would in theory only need recharging once per week, so one
charger could potentially serve five vehicles.
A system will need to be devised to allow for essential charging, where a vehicle needs a
charge, but a charge point is not available. This could involve either installing a small number
of buffer chargers that are only used for essential charging or advising staff to use public
charge points when available. 
13.6 Heavy Duty Vehicles
The UK Government Decarbonising Transport plan for Heavy Duty Vehicles (HDV) details that
all sales of new medium sized trucks (up to and including 26 tonnes) to be zero emissions
from 2035. with the heaviest (above 26 tonnes) zero emissions by 2040.
The Council is aiming to achieve the public sector fleet decarbonisation targets, these state
that all HDVs (Heavy Duty Vehicles) are to be zero-emission from 2030. With these targets in
mind, the Energy Saving Trust had been commissioned to produce an HDV-focused fleet
decarbonisation report for North Ayrshire Council.
There is a growing number of viable zero-emission alternatives, particularly Refuse Collection
Vehicles (RCV), however at present they do have high upfront costs and it is likely that more
viable zero emission replacements options will appear in the next few years.
Hydrogen is often discussed as a key fuel source in a net zero future. Fuel cell electric vehicles
(FCEVs) use hydrogen to produce electricity, these offer efficient and quiet transport with no
200

Page 201

16 
exhaust emissions other than water. If fuelled by hydrogen produced from renewable sources,
they are a true zero emission solution.
The main advantage of hydrogen over battery electric is its much higher energy density. This
gives hydrogen vehicles a driving range comparable to conventional fossil fuel ICE vehicles.
However, hydrogen fuel cell electric vehicles (FCEVs) are an innovative technology and are
currently at an earlier stage of development than electric vehicles and it is expected that the
range of available hydrogen vehicles to expand over the next few years along with adequate
refuelling infrastructure.
In support of decarbonising the existing HDV fleet, an interim alternative could be the use of
HVO (hydrotreated vegetable oil). This can offer a potential short to medium term option for
our HDV fleet where ready electric replacements are not available or would be cost prohibitive.
HVO makes sense, not only because it can deliver up to 90% well-to-wheel carbon reduction
but also because it is a drop-in alternative to diesel.
From 2030 onwards the Council will need to consider the procurement of zero emission
HDV’s, these vehicles have the longest life cycles and have the highest potential for CO2e
savings. Were we have HDVs that must be replaced in the short term but have no zero
emission replacement options, we will continue to specify that these are equipped with the
latest Euro 6 diesel engines to help keep our fleet emissions as low as possible. 
14 Performance Indicators
The service has a few performance indicators in place to measure the availability and cost of
maintaining assets, these are benchmarked through the APSE (Association for Public Service
Excellence) performance networks. 
Indicator 2019/20 2020/21 2021/22 2022/23 2023/24
(target)
Fuel Use (litres) 1,678,518 1,466,780 1,514,271 1,572,108 1,500,000
CO2 Emissions (tonnes) 3,938 3,311 3,498 3,689 3,600
% of vehicles serviced
within 7 days of schedule  98  99  99  99  99
% of vehicles passing
DVSA (Driver and Vehicle
Standards Agency) MOT
test first time 
98.57  100  98.55  97.30  100 
The following is a list of additional Key Performance Indicators (KPIs) which the Transport Hub
are regularly reporting. The list is not exhaustive and is for the purpose of demonstrating the
types of information that is collected.
 Vehicle downtime – the number of days’ service lost due to maintenance and repairs.
This allows the Hub to focus on the reasons for an increased figure such as an increase
in vehicle damage or the workshop being under resourced.
201

Page 202

17
 Vehicle availability – the number of days the fleet was available for use. This is used
to provide information on availability for service demand.
 Vehicle utilisation – this helps identify whether the fleet is too large or too small. It
can also be used to help with decision making on fleet size and to highlight issues with
staff absence.
 Number of accidents – this highlights staff training requirements.
 Number of vehicle defects – these highlight maintenance issues or how an ageing
fleet is adding to the Councils cost. It can also be used as information for selecting new
vehicles.
 Number of MOT failures or first time MOT passes – this is used to measure the
performance of the workshop.
16 ACTION PLAN
Action
Plan
Reference
Action Desired
Outcome Lead Timescale
FAMP A01
Develop the existing EV
working group into a fleet
decarbonisation group, which
will report to our already
established Climate Change
Steering Group.
Working Group
Established Transport
Hub October 2023
FAMP A02
The purchase of new
passenger and Light
Commercial Vehicles (LCVs)
will be zero emission vehicles
only.
Reduction of ICE
vehicles and fleet
produced
emissions
Transport
Hub Ongoing
FAMP A03
To undertake further research,
including with the Hydrogen
Accelerator Project and
consideration of HVO as a
potential short to medium term
option for existing heavy fleet
combustion vehicles.
Reduction of fleet
produced
emissions Sustaina
bility March 2024
FAMP A04
Share the findings of our
decarbonisation routemap
with CPP partners to identify
any potential synergies
including in relation to vehicle
charging infrastructure.
Shared working Sustaina
bility March 2024
202

Page 203

18
FAMP A05
Review future electricity
generation proposals and
potential links with charging
requirements at depot
locations.
Energy efficiency Sustaina
bility March 2024
FAMP A06
Review the potential
emerging's from our Digital
Strategy and work with
services
Reduction in
demand for
vehicles and
travel
Transport
Hub Ongoing
FAMP A07
Review of EV maintenance
costs and develop mechanics
by supporting attendance of
training on electric/hybrid
vehicle systems repair and
replacement
Identify the needs
and ensure the
demands of future
technologies can
be met
Transport
Hub December
2023
FAMP A08
Review the capital programme
provision for fiscal year
2024/25 onwards to consider
the current £10.620m gap to
further support
decarbonisation requirements.
To meet the
government
targets additional
funding must be
made available
Transport
Hub September
2023
FAMP A09
Lobby Scottish Government
through existing networks
(including COSLA, SOLACE
and the Sustainable Scotland
Network).
Ensure the
financial burden is
voiced and scope
the potential for
any additional
funding
Head of
Sustaina
bility,
Corporat
e
Property
&
Transport
Ongoing
203

Page 204

1 
HOUSING ASSET MANAGEMENT PLAN 
1. Introduction
204

Page 205

2 
The Housing Asset Management Plan (HAMP) has been developed to complement:
• The North Ayrshire Local Housing Strategy 2023 - 2028
• The Council’s Housing Revenue Account 30 Year Business Plan (HRA Business Plan)
• Delivery of the Strategic Housing Investment Plan 
The Council endeavours to deliver the best service with the resources available, with the focus
of the HAMP being to set a framework that will:
• Aim for 100% Scottish Housing Quality Standard (SHQS) and achieve full Energy
Efficiency Standard for Social Housing (EESSH/EESSH2) compliance and is aligned
with the Housing to 2040 route map.
• Exceed the standards and outcomes set by the Scottish Social Housing Charter.
• Ensure the Council’s housing stock is maintained in a condition compliant with existing
and proposed legislation and standards. 
1.1 Housing to 2040
The Scottish Government’s “Housing to 2040” paper outlines a long-term vision for housing in
Scotland and sets out key objectives and strategies to address housing challenges and meet
the needs of the population. Key themes include:
• Vision – the paper envisions an environment where everyone has a safe, affordable,
and warm home that meets their needs and supports their wellbeing.
• Affordable Housing – The Government aims to increase the supply of affordable
housing, including social and affordable rented homes, intermediate housing and low-
cost home ownership options. This will be achieved through increased investment,
partnership working and innovative financing models.
• Energy Efficiency – there is a strong emphasis on improving the energy efficiency of
homes to combat climate change and reduce fuel poverty. The Government aims to
ensure that all homes meet high energy efficiency standards, making them more
environmentally sustainable and affordable to heat.
• Quality & Standards – the paper highlights the importance of delivering high quality
homes that are designed to be accessible, adaptable, and inclusive.
• Place Making – The guidance aims to create thriving and sustainable communities by
considering the broader social, economic and environmental factors that contribute to
the quality of housing areas. This includes promoting mixed- tenure developments,
improving public spaces and enhancing community facilities.
• Housing and Homelessness – the paper recognises the need for a coordinated and
efficient housing system, involving collaboration between the Government, housing
providers and other stakeholders. There is a commitment to the prevention of
homelessness and supporting those in need of social housing, with a particular
emphasis on early intervention.
• Digital inclusion – the Government acknowledges the potential of digital technology to
improve housing services and delivery. It highlights the importance of digital
connectivity, smart homes and data-driven solutions to enhance the quality of housing
and improve the lives of residents. 
Housing to 2040 is an ambitious and comprehensive strategy to address housing challenges,
promote sustainable development, and ensure that everyone in Scotland has access to high-
quality, affordable homes that meet their needs. 
The HAMP reflects several key themes, including:
205

Page 206

3
• The Council’s commitment to embracing effective asset management principles in
relation to its housing stock.
• The importance of maintaining effective stock condition information.
• The assessment of future options for poorly performing or obsolete stock.
• Effective procurement of investment projects carried out under the Housing Revenue
Account.
• The effective delivery of capital investment programmes and planned maintenance
and reactive maintenance programmes that are key to ensuring the housing stock is
maintained in the best condition possible.
The Action Plan at the end of this document captures the over-arching key deliverable tasks
for the 2023-28 period, with appropriate actions being added, removed or amended on an
annual basis.
2. Aims & Objectives
The importance of asset management is evident throughout the Council Plan 2023 - 28. The
HAMP outlines the priorities for the ongoing maintenance and improvement of the housing
stock and is intended to assist the Council on achieving the vision to have a North Ayrshire
that is fair for all and to achieve our mission of working together to improve the lives of our
people in North Ayrshire. The HAMP has been created to support delivery of several of the
key priorities, namely:
Priority - Climate Change
Key activities
• Reducing the carbon footprint of our estate through rationalisation utilising a locality-
based approach and taking a fabric first and low carbon energy generation approach
to homes and buildings.
• Developing local low carbon energy generation schemes and networks.
• Working with communities to adopt low carbon behaviour change and encourage
climate-based volunteering activities.
Priority – Wellbeing
Key activities
• Using our assets to support wellbeing in local communities.
• Through our housebuilding programme and wider housing investment provide homes
for life that meet the needs of our residents.
• Ensure our paces and spaces where we live, work and visit are well maintained and
accessible.
Priority - Communities and Local Democracy
Key activities
• Developing strong relationships with communities and partners based on trust and
shared aspirations using their experiences to inform service provision.
• Supporting the Community Planning Partnership and the North Ayrshire Partnership
Plan.
• Developing partnerships with the third and voluntary sector.
• Ensuring an inclusive, fair, rights-based and asset-based approach in our work.
206

Page 207

4
Priority - A Sustainable Council
Key activities
• Ensuring robust governance arrangements are in place to fulfil the Council’s statutory
duties, manage risk and support delivery of key priorities.
• Using dynamic data and lived experiences to inform decision-making.
• Working with partners nationally, regionally and locally to secure investment and
target resources towards our priorities.
The delivery of the HAMP has been developed taking account of appropriate
services and stakeholder groups, including:
• Major Works Working Group
• Recognised Tenant and Resident Groups
• Housing Business Plan Group (HBPG)
• Housing Asset Management Board (HAMB)
• SHIP Project Board
In terms of effective governance and management of the HAMP, progress against the
agreed action plan will be regularly monitored through the Housing Asset Management
Board.
3. Asset Management Systems
North Ayrshire Council has a range of systems to assist in delivering our asset management
strategy. Central to effective stock repair and maintenance is the development of robust and
integrated computer systems to monitor operational service delivery and to enable effective
planning. These tools include:
• A dedicated housing asset management software system (APEX) which contains all
property information relating to the housing stock.
• PMI currently holds detailed stock condition data for 96% of our housing stock. This
information is gathered by an independent surveying company. We carry out a cyclical
stock condition programme which covers around 8% of the housing stock each year,
this allows the information held to be continually updated due to continued investment
in our properties. The information from these surveys is held within the APEX system.
• An asbestos management database.
• A process that reviews all homes which meet several criteria e.g. hard to let, significant
works required, estate management issues and continuous void turnover.
• A business case process to test in advance the soundness of major capital investment
proposals.
• An informed experienced team of in-house staff to deliver projects within approved
timescales and budgets.
These are the tools required to enable the Council to take informed decisions regarding future
investment in the housing stock. This investment will ensure that the following outcomes are
achieved:
• Refurbishment of dwellings to ensure they remain attractive, meet modern
requirements and tenant expectations.
• A planned maintenance programme, achieving economies by replacing components
just before they would otherwise require response repairs, anticipating changes in
207

Page 208

5
minimum acceptable standards, and reducing future requirements for cyclical
maintenance.
• Cyclical maintenance to prevent deterioration in the physical condition of stock.
• A responsive maintenance service, to ensure that tenants remain satisfied with their
accommodation and to prevent unplanned deterioration in its condition.
• An efficient and effective voids repair service, helping to speed up the repairs process
and protect the Council’s revenue and provide additional stock condition data.
4. Repairs and Maintenance
4.1 Response Maintenance
‘Response repairs’ is the term used to refer to day-to-day and emergency repairs e.g. fused
electrical points, burst pipes, broken windows, missing roof tiles, blocked drains etc. To
maintain the housing stock in good condition, tenants are encouraged to report these types of
repairs. The repairs are carried out promptly and effectively by Building Services in
accordance with the Repairs Policy.
North Ayrshire Council will continue to review and endeavour to achieve continuous
improvement, regarding the performance of the response maintenance service. We aim to
achieve a repair service that completes a repair correctly, first time, every time. To ensure that
this is achieved the following arrangements are in place:
• Facilities for easy reporting of repairs which includes a dedicated repairs contact centre
which is operational 24 hours per day.
• Procedures to accurately identify the nature of the repair when it is reported and to
arrange a convenient appointment.
• Procedures to prioritise the urgency of the works.
• A Tenant Handbook, which advises tenants on how to deal with emergencies, how and
when to report a repair, and further supplementary advice e.g. asbestos, gas servicing,
Right to Repair Scheme, energy conservation etc. The Handbook will also confirm the
duty of tenants to keep appointments for repairs, to avoid abortive and/or multiple visits
by staff.
The Gas Safety (Installation and Use) Regulations 1998 require that gas fittings and flues
are maintained in a safe condition for tenants and to carry out safety checks for appliances
and flues every year. North Ayrshire Council employs the services of an external contractor
to carry out all gas related works, under the management of PMI. When a tenant requires a
response repair relating to gas these are carried out by our appointed contractor.
Within the stock profile we have 28 Sheltered Housing Units, these units have several
systems within them such as call systems and door entry systems where response repairs
are not carried out by Building Services, repairs to these systems are administered and
instructed by PMI using specialist contractors.
4.2 Void Repairs
Void property repairs are those repairs, which after inspection and considering its age,
condition and future programmed works, are deemed necessary to bring the property back to
an agreed pre-let standard.
The Council aims to re-let void properties as quickly as possible. When a tenant gives notice
that they intend leaving their property, an initial pre-termination inspection is carried out. This
provides an opportunity to identify repairs required, including those that the outgoing tenant
will be held responsible for. If no repairs are required, the property will immediately be subject
to the allocation’s procedures. During the void process our gas maintenance contractor visits
208

Page 209

6
the property to isolate the supply to allow any void works to be undertaken safely and assesses
the condition of the current system. At the end of the void period a full service “pre-let” is
carried out
If repairs or improvements are required the new tenant will be notified of the work that requires
to be carried out, which will be completed within reasonable timescales.
4.3 Planned Maintenance
Planned maintenance covers the replacement of items that are at the end of their useful life,
where the replacement can be predicted and planned for.
Expected lifespan for main components (reviewed annually)
Component Expected life
Central Heating (Gas & Elec, ASHP) 15 years
Electrical Rewiring 30 years
Window replacement 30 years
Kitchen 22 years
Bathroom 27 years
Roofing (dependent on roof finish) 43 - 63 years
Rendering 35 years
External Wall Insulation 35 years
Smoke detection 10 years
Programmes of work are prepared for planned maintenance activities. The programmes are
compliant with the requirements of the Scottish Housing Quality Standard. The Council will
seek to implement replacement programmes cost effectively and with a view to minimising
inconvenience to tenants.
Where practical, the Council will group component replacement into packages, with several
components within a property being replaced at the same time.
The current external condition of building components and finishes will be assessed through
a system of annual inspections by Building Service’s officers covering a minimum of 25% of
the properties, so that every property is inspected by Council staff at least once every four
years.
The results are incorporated into an ongoing programme of planned maintenance works. It is
intended to carry out as much maintenance work as possible on a planned basis.
4.4 Cyclical Maintenance
In terms of both statutory and non-statutory cyclical maintenance our responsibilities are to
ensure that:
• All gas heating systems in the properties are serviced annually and have any repairs
carried out quickly and effectively. Accurate records are maintained of all servicing and
maintenance and an escalation procedure is in place to gain access to properties
where the tenants have refused the authorised contractors’ access.
209

Page 210

7
• Electrical circuits in properties are checked at least once every 5 years.
• Fire Risk Assessments, where required, are carried out at appropriate intervals.
• Where necessary, fire alarm, emergency lighting, lift installations and water hygiene
systems are checked and maintained in accordance with the appropriate legislative
requirements.
• Smoke alarms are working effectively before letting a property to a tenant and that
tenants are aware of their responsibility to report any faulty alarms.
• Annual Portable Appliance Testing (PAT) is carried out in common areas within
sheltered housing units and hostels.
In addition to the above, the Council recognises their duty under the Health and Safety at Work
Act to ensure the risk of exposure to the legionella bacteria is properly controlled. Guidance
to fulfil these duties is set out in the HSE Approved Code of Practice ‘L8’. The Council has
implemented the requirements of L8 in terms of sheltered housing units and flatted
accommodation blocks. This includes completion of risk assessments, water hygiene regimes
and undertaking of necessary upgrade works.
Routine maintenance is essential to preserve the lifespan of components and to maintain the
appearance of properties and estates. Open areas within estates that are the Council’s
responsibility are maintained this includes grass cutting, tree and shrub maintenance. Budgets
have been identified within the HRA 30-year Business Plan for estate management including:
• upgrading of non-adopted footpaths, roads and lighting to adoptable standard
• provision of additional car parking in our estates
• Estate Based Regeneration Programme (EBRP) developed to improve the
appearance of estates throughout North Ayrshire.
5. Asset Portfolio
The HAMP concentrates on the Council’s permanent rented portfolio and sheltered housing
units and the delivery of the Strategic Housing Improvement Plan. At the time of writing, North
Ayrshire Council currently owns 13,273 social housing properties.
The assets are used by the Council to provide social housing for North Ayrshire Council
tenants and applicants on the Common Housing Register. There is a constant demand for
suitable housing and the Council recognises that it is important to make the best use of the
housing stock in line with the demographics of the area, and for there to be a quick turn round
in empty properties.
The overall valuation of the Council’s housing assets as at 31 March 2023 was £572.86 million.
During the period between 2010-2015 the Council invested more than £20 million per annum
to meet the requirements of SHQS. Since 2015 there has been continued investment of more
than £10 million per annum to ensure compliance levels are maintained and new legislative
standards are met.
In addition, at the time of writing, the Council has constructed 831 new homes, and is making
good progress towards our commitment to build a total of 1,625 by March 2028.
The table below illustrates the net book value of the Housing Revenue Account assets.
5.1 Asset Valuation (as at 31 March 2023)
210

Page 211

8 
Asset Group Stock
Numbers
(units)
Amenity Bungalow 722
Bungalow 647
2 Storey House 6,885
4 in Block 2,833
Amenity 4 in Block 3
Tenement Flat 1,016
Amenity Tenement Flat 221
Sheltered Housing 627
Maisonette 252
Multi Storey Flat 67
Housing Asset Total 13,273
Net Book Value (with vacant possession) £527.86m 
The table below illustrates the distribution of stock by location and bedroom size: 
5.2 Housing Services Stock Breakdown (Location and Bedroom Size) 
Bedsit 1 bed 2 bed 3 bed 4 bed 5 bed 6 bed Total
Ardrossan 20 247 587 331 52   1,237
Barrmill   21 3    24
Beith  206 270 179 15   670
Brodick   27 3 4   34
Dalry  190 379 148 4   721
Fairlie &
Largs   18  16  15     49
Irvine 40 1,024 1,730 1,115 185 1 1 4,096
Kilbirnie  192 521 389 17   1,119
Kilwinning  279 806 398 54   1,537
Largs 7 190 282 61 6   546
Longbar &
Glengarnock   15  42  10     67
Millport   24 5 1   30
Saltcoats  257 572 453 56 1  1,339
Skelmorlie  20 22 4 2   48
Stevenston 3 246 515 697 35   1,496
West
Kilbride   100  84  73  3    260         
Total 86 2,984 5,898 3,884 434 2 1 13,273
211

Page 212

9 
Two-bedroom properties remain the most common size of the stock total, followed by three-
bedroom properties. Together, two- and three-bedroom properties account for approximately
74% of the total stock. 
6. Performance 
6.1 Stock Condition 
Overall, our housing stock is in very good condition and well maintained. We take a
proactive approach to asset management and target improvements to ensure that our
properties are SHQS and EESSH compliant. Properties are the subject of regular investment
to ensure they remain attractive and meet modern requirements and tenant expectations.
We have a range of planned maintenance programmes and undertake cyclical maintenance
which maximise the return on investment and ensure replacement is undertaken prior to
major reactive maintenance being required or condition deterioration. 
The Council has robust and comprehensive stock condition information. Stock condition
surveys are available for 96% of the housing stock with approximately 8% of our stock subject
to a full condition survey each year. 
The properties are selected based on type/ age and geographical location. Each property
survey assesses the internal and external aspects of the property alongside a minRDSap
energy survey. The survey is carried out by an external Chartered Surveyor and uploaded
from the surveyor’s handheld device to our asset management system APEX. The data is
validated internally by PMI staff, and each data set of property information is assessed for
compliance with the SHQS and EESSH. The System is also updated monthly with asset
improvements and major repairs completions to ensure that information is as accurate and
relevant as possible. Properties which fail the standards are highlighted and placed on
capital or major revenue improvement programmes. This information is also used to inform
the 30-year business plan and prepare planned and cyclical programmes of work. 
6.2 Performance & Governance 
To accurately track performance in relation to the maintenance and repair of the Council’s
housing stock, PMI and Housing Services report regularly to both internal and external
stakeholders including: 
• Housing Asset Management Board
• APSE
• Scottish Housing Regulator (SHR)
• Scottish Housing Network (SHN)
• Scottish Government 
The following approaches are incorporated into our working practices: 
• Robust performance monitoring and reporting through the Council’s performance
management system - Pentana
• Adopted a lean approach to construction design and management
• Strengthened project governance arrangements
• Embrace principles of modern procurement and supply chain management 
6.3 Housing Asset Management Board
212

Page 213

10
The Housing Asset Management Board (HAMB) was established in 2022 with a remit to
provide governance and accountability for expenditure from the Housing Revenue Account.
The HAMB comprises officer representatives from various Council services and covers the
following areas:
• Ensure that policies, procedures, and systems of work are established to comply with
all relevant legislation.
• Monitoring of financial spend across the HRA.
• Regularly review capital programme delivery.
• Escalation of key project decisions.
• Allow cross service discussion on issues relating to future programmes of work.
• Facilitate reporting to Scottish Housing regulator.
Key themes of the plan are also discussed and agreed at regular forums, including the Joint
Improvement Group and the quarterly Major Works Working Group.
The Council approves annual budgets for the work to be undertaken under this strategy and
set performance targets to enable monitoring of financial expenditure and service standards.
7. Legislation
7.1 Scottish Housing Quality Standard (SHQS)
All social housing in Scotland must comply with a minimum base standard known as the
Scottish Housing Quality Standard (SHQS). This standard is broken into five categories,
namely:
• Compliant with the Tolerable Standard.
• Free from serious disrepair.
• Energy efficient.
• Provided with modern facilities and services; and
• Healthy, safe and secure.
Definitions for each of the five criteria are contained in the Scottish Housing Quality Standard
Technical Guidance published by the Scottish Housing Regulator.
In April 2020, the SHQS was revised to demonstrate that in order to comply with compliance
elements 11 and 45, landlords must organise electrical safety inspections at intervals of no
more than five years in line with BS 7671:2018. This was a change from our previous cycle
of testing which was every 10 years and resulted in our SHQS compliance dropping from
99.09% in 2019 to 63.24% in 2022/23.
The appointment of a contractor to carry out the electrical testing of properties was issued in
March 2020, however due to the Covid pandemic and government guidelines, the
commencement of this contract was delayed, leading to a backlog of properties and we have
also experienced high volumes of properties failing to allow access for this essential work. To
address the difficulties in this area and achieve compliance, a working group has been
established and an improvement plan implemented. This includes working with our Housing
Colleagues to address areas of persistent no access and an ongoing social media campaign
to raise tenant awareness of the importance of this area.
Progress in this area is regularly reported to the statutory compliance working group, Council
Members and at the HAMB. The Scottish Housing Regulator is currently provided with a
213

Page 214

11
monthly update of our progress in this area and the processes being implemented to achieve
full compliance.
7.2 Energy Efficiency Standard for Social Housing (EESSH)
EESSH encourages landlords to improve the energy efficiency of social housing in Scotland
leading to reductions in energy consumption, fuel poverty and the emission of greenhouse
gases. An initial milestone of 31 Dec 2020 was set for EESSH compliance, and a further
milestone (EESSH 2) was set for Dec 2032 whereby all social housing in Scotland would
achieve an energy efficiency rating of EPC band B or above.
The Scottish Government’s recently published twenty-year vision for housing, Housing to
2040, sets out the commitment to adapt and retrofit existing homes to improve their energy
efficiency and decarbonise their heating, highlighting housing’s contribution to reducing
climate change emissions. The report recognised the need for a review of the EESSH target
to be carried out as part of the commitment to achieve net zero emissions.
In March 2021, the Zero Emissions Social Housing Taskforce (ZEST) was convened by the
then Minister for Local Government, Housing and Planning. It was asked to look at the
opportunities, barriers and solutions required of social housing to maximise its contribution to
the Scottish Government’s ambitious climate change targets. The report recommended that
review of the current EESSH guidance be brought forward. Part of this review is to agree new
milestones which are more closely aligned with the Scotland’s 2045 net zero emissions target.
The first meeting of the review group took place in September 2022 and is expected to
complete in 2023.
In direct response the Scottish Government issued further guidance on EESSH in October
2022 which:
• Placed a hold on the 2025 & 2032 milestones previously issued.
• Advised that during the review period landlords should continue with investment
programmes and prioritise a fabric first approach.
• Advised that external funding options be explored where possible to assist with
the delivery of investment programmes.
At 31 March 2023, 98.2% of North Ayrshire properties achieved or exceeded the EESSH
standard; however, it is recognised that considerable work will be required to achieve EESSH2
compliance in particular regarding options for decarbonisation of heat.
We continue to work towards this by implementing energy efficiency measures as part of the
Council’s capital programmes and are in the process of identifying an area suitable for a
pathfinder project where the properties involved will receive all necessary measures to
achieve expected EESSH 2 compliances. This pathfinder project will allow the collation and
analysis of real-life costs and performance information which will inform future business
planning.
In addition, a pilot programme was delivered to retrofit 500 Council owned homes with rooftop
solar photovoltaic (PV) systems. This programme supported delivery of financial savings and
reduce fuel poverty for tenants, reduce carbon emissions, and increase energy security.
Following the success of this pilot programme, solar PV is now installed on Council owned
homes as part of the planned annual re-roofing and rendering programmes. Solar PV systems
are also being installed at sheltered housing units as part of the refurbishment works
214

Page 215

12 
programme. Our external wall insulation programme is also being extended to ensure that
the maximum number of properties benefit from increased insulation which provides both an
energy efficiency measure and will provide benefit to our Tenants in reducing their heating
costs. 
Our new build programme is also key area in delivering energy efficiency measures, the new
homes being constructed utilise the latest energy efficient technologies including increased
levels of thermal insulation and air tightness, air source heat pumps and solar panels. 
7.3. New Housing Standard 
Sustainability performance is central to our specification for both new build and existing stock.
The Council’s standard specification for our new builds includes for enhanced building fabric
and Zero Direct Emissions (ZDE) heating solutions that go beyond the minimum requirement
of the current and recently updated Building Standards. 
The Scottish Government started consultation on the “New Housing Standard” in 2021, with
the aim to publish the draft standard in 2023, enact it in law and introduce it between 2025
and 2030. 
The new standard means that all homes (private and social) will have a legal duty to meet the
same minimum standard. All new build homes will have to meet a Scottish version of the
Passivhaus standard, meaning they will be highly energy efficient and well ventilated. This is
the biggest step yet in the push towards making sure that all new build homes are low carbon
and economical for tenants to heat. 
There will be no margins of tolerance, no exemptions and no “acceptable levels” of sub-
standard homes. The HAMP will be updated when the Scottish Government publish further
guidance on the “new Housing Standard”. 
8. Future Demands 
Despite the Council’s new build housing programme, most of North Ayrshire Council’s stock
comprises of housing built by former local authorities and the former Irvine Development
Corporation. The stock was built to comply with National Standards and Regulations and is
subject to ongoing programmes of repair, maintenance, and improvement. 
The Council has a record of substantial investment in its housing stock and has adopted an
incremental approach to major element renewal with a range of major renewal programmes
including roofs, external walls, windows, doors, insulation, heating, kitchens and bathrooms.
The criteria to prioritise elemental renewal work is based on factors such as age and condition.
This approach has ensured that funding has been accurately targeted where condition-based
need is greatest. The aim has been to achieve this same standard of condition for every house
in the stock. 
The Council also operates major revenue funded programmes of reactive and planned
maintenance to meet ongoing demand for repairs requested by tenants, repairs to void
properties and planned maintenance work. 
The key objective for the future is to achieve, for all major elements, ongoing life cycle
replacement programmes, designed to pre-empt element failure and to ensure continued
compliance with the SHQS, EESSH and future legislative requirements. This proactive
planned approach to stock investment ensures best value is achieved and reduces the
requirement for expensive response repairs.
215

Page 216

13 
However, there are several reasons why a property may cease to meet the Council’s strategic
requirements and may be considered for disposal. We will carry out an evaluation and
assessment of stock meeting these criteria and consider options for stock regeneration
programmes, including new build, refurbishment, demolition etc. 
Demand for Council Housing remains high, although it is recognised that there are areas of
unpopular stock. Work will continue to be undertaken to address the factors contributing to
demand for particular house types and areas and align with Council priorities. 
In the current economic climate, the delivery of new build properties, refurbishment projects
and cyclical capital and revenue investment programmes is becoming increasingly financially
challenging, and we need to balance project affordability and impact on future rent levels as
part of our HRA Business Planning process. 
8.1 Sheltered Housing Unit Refurbishment Programme 
The need for high quality, accessible housing for older people is recognised within the
Council’s ‘Older People’s Housing Strategy’. The Housing Revenue Account budget approved
by Council in December 2020 included the provision of a further £25m investment in our
Sheltered Housing Re-provisioning Programme. This allows us to continue improving our
sheltered housing portfolio and ensure Council complexes within North Ayrshire are high
quality, energy efficient and meet tenants’ needs and aspirations. 
Eleven properties not already refurbished or redeveloped through the SHIP were identified
and following a review of the property lifecycle data for these units, Barnett Court in
Saltcoats and Cheviot Court in Irvine were selected as the first two to be progressed. 
The programme involves the full refurbishment – including new heating systems, windows
and external doors, Solar PV's, CCTV installation, upgrading of the door entry system,
external works including external insulation if appropriate, additional car parking and EV
charging infrastructure. 
As of 2023 works have commenced at both Barnett Court and Cheviot Court with design
works progressing for the remaining units. 
8.2 Estate Based Regeneration Programme (EBRP) 
The Council has committed to investing £10 million in our housing estates between 2019-
2029. This investment is used to address issues which cause residents to become dissatisfied
with their local area. These issues can include insufficient parking, areas attracting anti-social
behaviour, or lack of green space. 
The investment programme seeks to provide communities where residents are proud to live
and to safeguard them for future generations. 
Recent examples of work undertaken by the EBRP include:
• Hayocks area, Stevenston – 27 additional parking bays to alleviate parking pressures
(Dec ‘22)
216

Page 217

14 
• Bimson Place, Irvine – Rear gardens cleared and fenced, low maintenance chips and
rotary dryers installed, and pathways upgraded. (Feb ‘23)
• Glass Fronted Closes, Irvine – 12 glass screens replaced, including installation of
ramped access and creation of bin storage areas. (July ‘23)
• Dirrans, Kilwinning – creation of in-curtilage parking to 26 properties to alleviate
parking pressures (Oct ‘22)
• Keppenburn Avenue, Fairlie – creation of in-curtilage parking to alleviate parking
pressures. (Feb ‘23)
The EBRP forms part of the Council’s wider approach to regeneration. The programme was
borne through an aspiration to further invest in our estates to address pockets of low demand
stock; antisocial behaviour; external appearance; parking provision; road and footpath
condition; fencing; landscaping; and general grounds maintenance issues. The proposed
projects can also assist with solutions for disrepair in mixed-tenure blocks. These blocks can
often be in poorer condition as some owners either cannot afford or are not willing to contribute
to common repairs. Further assistance in this area is provided by PMIs factoring team who
engage with owners within these blocks to facilitate common repairs. 
The EBRP programme is developed in partnership with our tenants and consultation exercises
are carried out as appropriate. 
8.3 Multi Story Blocks 
In June 2018, the Council’s Cabinet approved the demolition of the Fullarton Tower Blocks in
Irvine and for the major refurbishment of the Saltcoats Tower Blocks. As of August 2023, the
demolition of the Fullarton Blocks is progressing well and expected to complete in late 2023.
Once cleared this site, will be passed to the SHIP programme to provide new build housing
consisting of general needs housing, amenity bungalows and accessible homes. 
Refurbishment works at Saltcoats, with an expected investment value of £2.25m, are expected
to complete late 2023 and have provided the residents with internal and external refurbishment
including upgraded central heating, rewiring and installation of a fire suppression system. The
final stage of the refurbishment will be the replacement of the lifts in the two blocks. This will
commence during 2023/24 which will further ensure the longevity of the blocks. 
8.4 New Build Housing 
In-line with North Ayrshire Council’s Strategic Housing Investment Plan 2024-29 we continue
to design, develop and deliver a new supply of affordable and sustainable housing for rent.
The Council's current housing development programme is on target to deliver a committed
1625 new homes by March 2029. 
The table below outlines new housing supply that has been developed or is in the process of
being developed by the Council: 
Project Completion
Date
No. of
Homes
Housing Mix
Vennel Gardens, Irvine 2015 16 Sheltered Housing Unit
Stevenston Institute, Largs 2015 11 Amenity Flats
Dickson Drive Phase1, Irvine 2015 8 General Needs Homes &
Amenity Bungalows
Montgomerie Court, Kilbirnie 2016 24 Sheltered Housing Unit &
Amenity Bungalows
217

Page 218

15 
Fencedyke, Irvine 2017 35 General Needs & Amenity
Homes
Glencairn House, Stevenston 2018 28 Sheltered Housing Unit
Kyleshill Court, Saltcoats 2019 36 Sheltered Housing Unit
Ardrossan Road, Seamill 2019 31 General Needs Homes &
Amenity Flats
Dickson Drive Phase 2, Irvine 2020 24 General Needs, Amenity and
Wheelchair Liveable Homes
Dalrymple Place, Irvine 2021 33 Sheltered Housing Unit and
Amenity Bungalows
Flatt Road, Largs 2021 123 Wheelchair, amenity and
general needs homes,
sheltered housing unit and
supported living unit
St Beya Gardens, Millport 2021 18 General Needs, Amenity and
Wheelchair Liveable Homes
Springvale Place, Saltcoats 2021 14 General Needs, Amenity and
Wheelchair Liveable Homes
Towerlands, Irvine 2022 50 General Needs, Amenity and
Wheelchair Liveable Homes
Brathwic Terrace, Arran 2022 34 General Needs, Amenity and
Wheelchair Liveable Homes
St Colm’s Place, Largs 2022 29 Sheltered Housing Unit
St Michael’s Wynd, Kilwinning 2022 79 Wheelchair, amenity and
general needs homes,
sheltered housing unit and
supported living unit
Harbourside, Irvine 2023 71 Sheltered housing unit,
wheelchair, amenity and
general needs homes
Caley Court, Stevenston 2023 16 Supported living
accommodation
Afton Court, Stevenston 2023 6 Amenity bungalows
Former Largs Police Station,
Largs
2023 12 Amenity flats
Ayrshire Central, Irvine 2027 202 General Needs, Amenity and
Wheelchair Liveable Homes
Montgomerie Park, Irvine 2027 189 General Needs, Amenity and
Wheelchair Liveable Homes
Former Garnock Academy,
Kilbirnie
2025 50 General Needs, Amenity and
Wheelchair Liveable Homes
Corsehillhead, Kilwinning 2025 7 Amenity and General Needs
Homes
Former James Reid School,
Saltcoats
2025 47 General Needs, Amenity and
Wheelchair Liveable Homes
Former Stanecastle School,
Irvine
2025 31 General Needs, Amenity and
Wheelchair Liveable Homes
Former James McFarlane
School, Ardrossan
2025 19 General Needs, Amenity and
Wheelchair Liveable Homes
Kings Arms, Irvine 2025 6 Amenity Flats
Fullerton Street, Irvine 2026 50 General Needs, Amenity and
Wheelchair Liveable Homes
218

Page 219

16
Bourtreehill Village, Irvine 2028 32 General Needs, Amenity and
Wheelchair Liveable Homes
Laburnum Avenue &
Newhouse Drive
2025 14 Amenity and General Needs
Homes
Refurbishment Project 8 2026 2 TBC
Regeneration Project 1e 2027 7 TBC
Regeneration Project 1d 2027 36 TBC
Unallocated Regeneration
Block 1
2027 30 TBC
Glebe Pace 2028 8 TBC
8.5 Island Housing
The Council is committed to supporting our island communities. 18 new homes were
completed on the Isle of Cumbrae during summer 2021. The site provided a mixture of
general needs houses, amenity bungalows and homes for wheelchair users.
The Council also completed 34 new homes at Brathwic Terrace on the Isle of Arran during
June 2022. The site provided a mixture of general needs houses, amenity bungalows and
homes for wheelchair users.
Island properties are subject to the same asset management approach as mainland
properties, with reactive and annual maintenance being the responsibility of Building
Services who have emergency arrangements in place with local island-based contractors.
These developments, alongside work with communities on the island, are anticipated to
stimulate investment in other infrastructure (transport, marine, digital) to encourage
economic growth. An Arran Housing Task Force has been established to support an
evidence-based assessment of demand for affordable housing on Arran. The assessment is
being undertaken by Northstar Consulting, in consultation with all affected parties, with
results expected late 2023. Thereafter, an action plan will be established to address the
outcomes of the assessment and any other recommendations made.
9. PMI Support services
9.1 Tenant Alterations & Improvements
The Council will allow tenants to carry out some alterations to their homes provided they have
sought our permission. Tenants must apply in advance, providing details of proposed works.
This covers any changes that they may wish to make to the inside of their home, decorating
of the outside or erecting any structures in the outside space. No permission is required for
minor decoration within the property.
Consent will not be unreasonably withheld provided the works comply with all relevant
standards. Tenants are also required to apply for any necessary statutory approvals. If tenants
remove any fixtures or carry out works without permission, they may be required to apply for
retrospective permission or in some instances restore them to the original condition. Where
a tenant is unwilling or unable to carry this out, they may be recharged for any costs associated
with restoring the property to its original condition.
9.2 Medical Adaptations
One of the Council’s main aims is to promote independent living and to ensure that tenants
can reside in their home for as long as possible.
219

Page 220

17 
The Council carries out alterations to tenanted properties to improve the quality of life of elderly
or disabled tenants. Tenants requesting alterations will have their needs assessed by an
HSCP Occupational Therapist, who will recommend the necessary alterations. The Council
will seek to carry out adaptations in order of priority as agreed with the Occupational Therapist
and as quickly as possible subject to available funding.
Adaptations can be low cost and minor (handrails and shower seats) or more extensive
(ramps, extensions, wet rooms). PMI assist in the delivery of the adaptations programme by
providing architectural support to HSCP to assist with the delivery of larger scale and more
complex adaptations to council properties.
Where appropriate design features are incorporated in new build and refurbished properties
that ensure homes are easily adapted should a resident’s circumstances change over time.
9.3 Asbestos Management
Asbestos containing materials were widely used in the construction industry prior to the year
2000. Any housing stock built or refurbished before this date may have asbestos containing
materials within its construction.
North Ayrshire Council is committed to managing work activities involving asbestos
containing materials to reduce the likelihood of asbestos fibres becoming airborne. Where
any construction works are carried out on behalf of North Ayrshire Council within the housing
stock, that building is deemed a workplace under the Health and Safety at Work Act. These
work activities are therefore subject to health and safety legislation including the Control of
Asbestos Regulations 2012.
It is current policy at North Ayrshire Council that no Council employee will work on any
asbestos containing materials. Where asbestos containing materials are identified the
Council will arrange for a specialist contractor to carry out removal or other appropriate work.
This applies to both licensed and non-licensed asbestos work as defined by the Health and
Safety Executive.
North Ayrshire Council uses an electronic database for recording its housing assets
asbestos information. Access to this database can be provided securely to contractors
ensuring safe working practices.
North Ayrshire Council appoints competent UKAS accredited contractors to conduct surveys.
• Management Survey: The purpose of the management survey is to manage
asbestos-containing materials (ACM) during the normal occupation and use of
premises.
• Refurbishment / Demolition Survey: The refurbishment / demolition survey is required
where the premises, or part of it, need upgrading, refurbishment, or demolition.
It is Council policy to carry out management surveys on all Council housing stock, however
this may not always be possible due to access difficulties.
Currently the Council has asbestos information recorded for 98% of its housing stock with
154 no accesses. These figures include 860 post 2000 builds which will not contain ACMs.
Refurbishment surveys are carried out whenever they are required by UKAS accredited
surveyors and are specific to the scope of works, these surveys are all available on the
asbestos database.
Management plans are available for all common areas within the housing stock as per
Health and Safety Executive recommendations. These plans are updated annually following
a running programme of re inspection. Currently North Ayrshire Council has 387 internal
220

Page 221

18 
common areas all of which are surveyed, of these 147 have asbestos containing materials
identified and are included in the re-inspection programme.
9.4 Property Factoring
The previous Right to Buy legislation led to the sale of approximately 12,000 homes to sitting
Council tenants. Approximately 1,413 of these properties share communal parts with other
properties. Typical examples would include flats and four-in-a-block style houses. 
At the time of selling these properties, the Council retained legal rights and responsibilities in
relation to the management and maintenance of the communal part. The Council has the legal
entity of being the Property Factor to enable it to perform these duties. 
The Property Factors (Scotland) Act 2011(the Act) aims to protect homeowners by providing
minimum standards for Property Factors. All provisions of the Act came into force on 1 October
2012 and apply to all residential property and land managers whether they are private sector
businesses, Local Authorities or housing associations. 
The Act has three main elements: 
• A compulsory register of all property factors operating in Scotland
• A code of conduct that sets out minimum standards of practice with which all
registered property factors must comply
• A new route for redress: the Housing & Property Chambers First Tier Tribunal.
Homeowners will be able to apply to the tribunal if they believe that their factor
has failed to comply with the code of conduct or otherwise failed to carry out
their factoring duties. 
To comply with the terms of the Act, the Council employs a dedicated property Factoring
Team. 
The Factoring Team has developed and implemented the processes required to comply with
the terms of the Act and issued a ‘Statement of Services’ to the 1,413 factored owners within
Council managed housing estates. 
Future development of the Factoring Service is a key action as it will improve the service
provided to the owners of our factored properties as well as generating future revenue income
for the Council. 
The Factoring Team handle a number of enquiries annually with referrals being received from
multiple sources including, but not limited to, homeowners and tenants, the Housing Repairs
line and Building Services Inspection Unit. During 2022, the Team recorded approximately
276 approaches and year to date in 2023 have recorded approximately 197 enquiries. Most
cases raised lead to the completion of essential repairs. Please note that these figures do not
consider approaches for general advice and assistance. In financial year 2022-2023, a total
of 180 owners were invoiced for repairs to a total value of £135,432.50 (including
administration fee & VAT). 
A successful Factoring Service provides a framework for improving the management of
common or shared parts of owner-occupied properties and provides the opportunity for the
Council and owner occupiers to communicate effectively in relation to future planned
maintenance work and potential energy efficiency projects.
221

Page 222

19 
The Scottish Government are currently in the process of reviewing the role of Property Factors
across the sector and have established three key areas for change. Proposals are currently
in early stages of development however may lead to significant development of the Factoring
Service in future years. 
10. Financial Summary 
All work carried out on the Council’s housing assets are funded from the Housing Revenue
Account or the Housing Capital Programme. Funds are obtained from a number of sources
principally rents from dwellings, which is in the region of £52.63m per annum, and other
income of approx. £0.563m is received from commercial interests in retail units and lock-up
garages. Capital receipts are also received through the sale of HRA assets amounting to
£0.224m in the period 2018-2023. 
Although the Council’s housing stock is in very good condition, investment is required to
ensure that it continues to perform as an effective asset. A 30-year Business Plan has been
developed to ensure that the appropriate level of funding is available to finance repairs and
investment to all stock. Each year future expenditure, including maintenance and investment
requirements are reviewed. The 30-year business plan is updated to determine required levels
of income required over the period of the plan. Various stakeholders are consulted on the
updated business plan. Tenants are consulted on rent proposals before the feedback and
report are provided to Council for consideration. 
The current Business Plan projects future investment to March 2053. It is reviewed annually
to ensure that all work continues to support the Council’s priorities and is based on the latest
appropriate condition survey information. Additional factors such as the cost of living and
pressures on rent income are considered during the development of the Business Plan. 
The investment costs for the period between April 2023 and March 2024 and projected
investment costs identified for the period between 2024 and 2054 are detailed below. These
costs include all anticipated works required to ensure that properties are maintained at or
above the required standards. 
Projected investment required during period April 2023 to March 2054: 
Cost Category 2023/24 2024/28 2028/33 2023/53 TOTAL
Improvements to
Existing Stock  29,009,490  83,951,435  98,769,118  943,224,495  1,177,957,830 
New Build Projects  116,132,786  53,828,232  -  -  169,961,018 
Void Costs  3,559,098  14,867,804  17,037,622  119,360,869  158,803,668 
Responsive Repairs  7,978,432  34,322,777  39,365,069  276,448,485  367,302,368
Planned & Cyclical
Maintenance  5,090,728  22,071,766  26,434,714  199,665,337  259,216,843
Infrastructure
Improvements  273,750  1,180,550  1,367,101  9,864,327  13,003,179
222

Page 223

20 
Aids & Adaptations  1,617,464  6,972,104  8,059,205  57,859,950  76,381,923 
Total  163,661,748  217,194,668  191,032,829  1,606,423,463  2,222,626,829 
11. Risk Management
The Council is committed to adopting best practice in the identification, evaluation, and cost
control of all risks to ensure that they are eliminated or reduced to an acceptable level.
At both strategic and operational levels, the Council recognises that the management of its
housing stock does have several identifiable risks.
• Building cost inflation and rising tender prices
• Shortages of materials and supply chain issues
• Capacity within the construction industry
• Technology changes, particularly in relation to heating options
• Impact of future legislative changes
To mitigate risks, several key controls have been developed. These are summarised as
follows:
• Major new build Projects 
The SHIP project board has been created to oversee the preparation, review, financial
management and overall delivery and implementation of the Council’s housing
development programme. The Board will be the final decision makers in terms of
priority, budget (including approval of additional spend), site housing matrix and design
concept sign off for each project site.
• Major Capital Projects 
These projects have dedicated monthly project boards and are reported bi-monthly to
the Housing Asset Management Board (HAMB), where issues of concern and risk
mitigation are standard agenda items.
The operational aspects of major capital projects are also reported and any risks
relating to the delivery are discussed.
• Other Major Works and Revenue Repair Projects 
The operational aspects of other major works and revenue repair projects are reported
monthly to the HAMB, with a risk register being maintained and reviewed as part of
this process.
• Dedicated professional technical staff.
• Ongoing and progressive training
Over-arching key risk and mitigations are noted below: 
Key Asset Risk Mitigation(s)
Ageing asset stock impacting
on condition
• Cyclical condition surveys
• Cyclical component replacement programmes
• New build programme (SHIP)
223

Page 224

21
• SHU refurbishment programme
• Saltcoats High Flats refurbishment programme
• Responsive repairs service
Statutory Compliance /
Safety
• Statutory compliance programmes (Gas safety /
EICR / Smoke detection upgrade)
• Governance and reporting procedures (HAM
Board, Annual Return on the Charter, Cabinet
reporting).
• Responsive repairs service
• Resource structure within PMI team being
reviewed
• Process for gaining access to people’s homes
being reviewed
• Condensation Damp and Mould Stategy and
reviews process being developed
• Statutory compliance working group established
Climate Emergency / EEESH
/ EESH2
• Council’s Sustainability and Climate Change
Strategy
• Whole house energy efficiency pilot project
• Energy Efficiency investment programmes
• New build programme (SHIP)
Investment requirements
exceeding budget availability
• Best value procurement of external contractors
• Long term business planning model and rent-
setting
• Governance and reporting procedures (SHIP
Board, HAM Board, cabinet etc.)
Increasing regulatory
demands
• Engagement with Information networks (APSE /
ALACHO / SHOPs etc.)
• Long term business planning model and rent-
setting
Staff resource to respond to
increasing demands
• Resource structure within PMI team being
reviewed
• Process for gaining access to people’s homes
being reviewed
• Staff training and development
Systemic issues within
construction industry supply
chains
• Quality standards within tender documents to
ensure appropriate contractors are appointed
• Governance and reporting procedures (SHIP
Board, HAM Board, cabinet etc.)
Uninsured perils • Risk based assessment on identified properties ie
subsidence.
12. Insurance
The Council’s housing assets are insured with a reputable insurer with considerable
experience in local authority insurance. The Council is committed to adopting best practices
in the identification, evaluation, and cost control of all risks to ensure that they are eliminated
or reduced to an acceptable level.
Subsidence material damage to properties is not covered by our insurers and the Council are
self-insured and handle subsidence related housing stock repairs from the HRA. There is also
an excess that the Council must pay for each insured risk.
224

Page 225

22 
As a result of the insurance exclusion for subsidence the Council aims to mitigate the risk
through the correct management of dwellings known to be at risk of subsidence. PMI are
working towards development of a process for the risk-based assessment of stock identified
to be within subsidence areas or identified through condition survey. This will require allocation
of a dedicated budget to allow mitigation of future risk. 
13. Action Plan 
The contents of the HAMP demonstrate that the Council is committed to providing high quality,
affordable houses for rent that not only meet the standards of SHQS and EESSH/EESSH2
but meet the expectations of tenants and user groups. 
To deliver the objectives of the 2023-2028 HAMP, an Action Plan is set out below. The Action
Plan covers a three-year period, from 2023-2026 and will be updated annually to take account
of the successful completion of actions. It is also intended that on an annual basis, new action
will be added, to reflect changes in over-arching objectives or changes brought about through
legislation. 
The Action Plan has been prepared to ensure that the key themes contained within the HAMP
are translated into deliverable objectives that can be reported and monitored on a quarterly
basis. 
Progress against the HAMP Action Plan will be reported at the Housing Asset Management
Board (HAMB) and escalated as appropriate to the Executive Director (Place)/Executive
Leadership Team.
225

Page 226

23 
2023 - 2028 Action Plan
The following actions have been identified as the Housing Asset Management Plan
improvement actions for 2023-28 and will be recorded on the Council’s performance
management system, Pentana. 
HAMP
Action Ref
Action Desired
Outcome
Lead Timescale
Strategic actions
HAMP_S01 Review Governance PMI March 2024 
governance arrangements   
arrangements remain robust   
relating to asset and fit for   
management purpose.   
including the role   
of officer groups,   
elected members   
and tenant   
representatives to   
ensure that   
strategic asset   
management   
reflects best   
practice.   
HAMP_S02 Review Accuracy of PMI Ongoing 
information asset   
management information is   
systems to ensure maintained.   
a comprehensive   
understanding of   
all assets is   
gathered, stored,   
accessed and   
analysed   
appropriately.   
HAMP_S03 Review existing Provision of PMI Ongoing 
asset accurate   
management information to   
approach to inform HRA   
ensure information Business Plan   
is used and ensure   
appropriately to robust   
influence decision   
investment making   
decisions and process.   
future asset   
management   
strategies.   
226

Page 227

24 
HAMP_S04 Review
performance
indicators to
ensure framework
reflects a robust
system of financial
management and
achieves value for
money.
Realistic and
measurable
outcomes are
recorded and
benchmarked.
PMI March 2024
HAMP_S05 Review workforce
planning in
relation to skills,
experience,
training and
knowledge across
all relevant
stakeholders in
the asset
management
process.
Asset team is
fit for purpose,
well trained
and engaged.
PMI March 2024
HAMP_S06 Review stock
profile, condition
information and
asset lifespan
considerations to
inform future
priorities and
programmes in
relation to stock
redevelopment
and regeneration
To take a
strategic asset
management
approach to
the future
stock profile.
PMI March 2024
HAMP_S08 Develop
pathfinder project
to inform longer
term investment
decisions to
deliver EESSH2
compliance.
Informed
decision
making in the
area of
retrofitting
sustainability
elements.
PMI March 2025
HAMP_S09 Expand
decarbonisation
strategies to
ensure all
investment aligns
with local and
national priorities /
targets.
Addressing
climate
emergency /
zero carbon
agenda.
PMI /
Sustainability
Ongoing
227

Page 228

25 
HAMP
Action Ref
Action Desired
Outcome
Lead Timescale
Operational Actions
HAMP_A01 Ensure compliance
with SHQS
(excluding
exemptions and
abeyances) with a
particular focus on
Electrical Installation
Condition Reports
(EICR) compliance.
100%
SHQS
complianc
e.
PMI Ongoing
HAMP_A02 Ensure compliance
with EESSH/2
(excluding
exemptions and
abeyances).
100%
EESS2
complianc
e.
PMI Ongoing
HAMP_A03 Work with Housing
Services to develop
and deliver SHU
refurbishment
projects.
Completio
n of SHU
refurbish
ment
projects.
PMI 2028/29
HAMP_A04 Work with Housing
Services to develop
and deliver projects
within the Strategic
Housing Investment
Plan.
Completio
n of SHIP
projects.
PMI Ongoing
HAMP_A05 Continue to develop
factoring service and
encourage owner
occupier uptake with
major planned and
capital investment
works.
Delivery
of an
effective
Factoring
Service.
PMI Ongoing
HAMP_A06 Continue with the
annual programme
of percentage stock
condition surveys
and upload all
necessary attributes,
condition, life
Continue
a regular
programm
e of stock
condition
surveys.
PMI Ongoing – 8 % of
Stock targeted per
annum
228

Page 229

26
expectancy and cost
information to the
Asset Management
System (Apex).
HAMP_A07 Work with Housing Deliver PMI
Services to develop the
and deliver projects annual
contained within the
Estate Based
EBRP. Ongoing.
Regeneration 10-
year Programme.
229

Page 230

ASSET MANAGEMENT PLAN 
ICT
230

Page 231

2
1. Introduction
This ICT (Information and Communications Technology) Asset Management Plan 2021-2024
supersedes the previous 2018 – 2021 Asset Management Plan. As per the previous Plan, this
new plan is linked to the ICT Technology Strategy and will depict the impact on hardware,
software, and application assets. North Ayrshire Council’s approach to Asset Management
Planning is based on the guidance given by CIPFA.
In relation to Governance the Information Technology Manager is responsible for
management and control of the Asset Management Plan which will be reviewed annually. The
Architecture Board acts as the assessment body for all IT investment and change. The ICT
Asset Management Plan outlines the Council’s approach to Asset Management and how this
links with the Technology Strategy.
2. Aims & Objectives
Council Plan
The importance of Asset Management is evident in the Council Plan 2023-28 Priorities
Priority – Wellbeing
Key Activities
• Improving educational attainment and achievement and closing the attainment gap.
Priority – Climate Change
Key Activities
• Reducing the carbon footprint of our estate through rationalisation
Priority - A Sustainable Council
Key Activities
• Driving change and transformation, using technology where appropriate, to deliver efficient
and effective services and support delivery of priorities.
• Maximising value from the use of our assets.
• Focusing our investment on priorities.
• Using dynamic data and lived experiences to inform decision-making.
3. Asset Types
All ICT asset types have, to some extent, clearly defined strategies for their delivery and
management which are summarised within this document along with high level commentary
regarding the asset base.
The asset base and scope of this document includes:
• End User Devices: PCs; Laptops; Mobile Phones
• Data Centre Technology: Server Hardware; Storage Hardware; Switch
Hardware; Firewall Hardware
• Network Technology: Data Switches & Routers; Wireless Access Points
• Software – Key Software and Applications
231

Page 232

3
4. Review of ICT Asset Management Plan 2018 – 2021
Provides an overview on progress on activities/approaches included within the
previous ICT (Information and Communications Technology) Asset Management Plan
The last three years has seen some significant changes to, progress in and challenges for the
way in which IT assets are deployed, developed, and utilised. The key aspects have been:
• The previous strategy of rolling out Virtual Desktop Infrastructure (VDI) which centralised
control of devices and helped prolong the life of desktop devices is no longer a fit for
purpose approach.
• There is a need to standardise desktop devices on the latest operating system version
(currently Windows 11) to ensure security, performance and improve ease of
management. This has seen a large-scale programme of replacement of older devices.
• The Council agreed the significant move to and investment in the Microsoft M365 suite of
products which provides a vast array of collaborative software and tools. Significantly,
migration away from Lotus Notes and Sametime to Outlook email and Teams has provided
opportunity for improved ways of working. Additionally, migration of file storage away from
network drives to Sharepoint will provide huge benefits in the way files are created, worked
on and stored, and will allow improvement in information management.
• 2020 saw the world hit by the COVID Pandemic with the resultant impact on the way the
Council conducts business. This has brought new challenges to how IT is delivered and
utilised. A significant change in direction has been required, with more people working
from home. Home working became the norm due to being compulsory for most staff. This
dramatic move to home working is unlikely to reverse as the Pandemic eases and most
staff have indicated the desire to continue some form of home or blended working. Going
forward, agile working rather than office desk-based working will become the norm. IT
Services has already started on the journey of supporting this future vision.
• A complete review of IT Infrastructure was completed, funds approved, and tender
exercise carried out. The outcome is a complete upgrade and refresh of Wide Area
Network (WAN), Local Area Network & WiFi (LAN & WiFi), and Telephony.
• A review of devices used in Education has been conducted which highlighted that around
70% of the desktop estate is ageing and requires replacement and that little or no disposal
of older devices is carried out. An operational group has been set up between IT Services
and Education to take forward actions resulting from the review, improve best practice
procedures and review asset management and disposal. An Education ICT capital
programme has been established to enable device refresh.
5. Activities/Approach identified in ICT Asset Management Plan 2018 – 2021
5.1 People at the Core
Deliver first class technical solutions built around the needs of our customers and
people.
The technology that IT Services introduce will be designed in partnership with Services across
the Council and will support business processes, service delivery and collaboration. ICT
assets will be aligned to the needs of the Council’s workforce, moving to more unified
applications and to single standardised devices.
232

Page 233

4 
5.1.1 Progress up to 2021
• Staff remote access to key systems maintained and improved.
• Provision of suitable desktop hardware for remote/home working.
• Enhancements put in place to support and automate device updates to ensure our estate
remains compliant and patched to the highest level - secure and robust devices enhance
agile working.
• Provision of additional mobile phones.
5.1.2 Future Focus for 2021 - 2024
• Enhance support for home/remote workforce.
• Investment in device replacement to support continued mobile/remote working.
• Deployment of softphone functionality and reduction in the number of desktop handsets. 
5.2 Anytime Anywhere Access
Enable colleagues to access the systems applications and information they need
wherever they are
The Council workforce must be able to access the systems and applications they need, to
support the community in the most efficient way possible. IT Services will drive the
transformation of the personal computer (PC) device estate of 2700 to a simplified, consistent
technology model known as virtual desktop infrastructure (VDI). To complement this
technology, IT Services will introduce a device loan system. This will enable procurement of
the right type and number of mobile devices. Over time, surplus devices will be removed to
support concurrent usage rather than the more traditional one device per person model.
5.2.1 Progress up to 2021
• VDI has been a useful solution however, a review of this technology combined with the
covid-driven need to work more agilely, has led to implementation of an alternative
technology with improved user experience.
• Investment in the Desktop estate to replace older models and support a move to Laptops
rather than PCs (Personal Computer).
5.2.2 Future Focus for 2021 - 2024
• Ongoing investment in the Laptop / Desktop estate through the PC Replacement capital
programme, refreshing hardware and standardising on the latest operating system.
• Migrate users away from VDI to Always on VPN (AoVPN) providing improved and
simplified remote access technology to support hybrid and remote working. VDI will only
be used as an exception and where necessary. 
5.3 Cloud First
Utilise cloud-based technologies where appropriate - new cloud-based systems should
be considered provided they represent good value.
Migrating the Council’s business application and software assets to the cloud would
significantly reduce the requirement for physical server hardware and storage at the Council’s
primary and business continuity sites. Business applications hosted in the cloud will be highly
available and business continuity will be seamless.
233

Page 234

5
Cloud adoption will necessitate the transformation of the ICT network from a traditional design
to an internet centric network which will be more scalable and more sustainable.
5.3.1 Progress up to 2021
• Exploration of cloud options with a Move to Cloud where appropriate approach.
5.3.2 Future Focus for 2021 - 2024
• Continued implementation of M365 and Sharepoint
• Implementation of a new Cloud IT Service Management system (ITSM)
• Implementation of a Cloud managed WiFi solution.
• Implementation of a Cloud-ready Telephony solution.
5.4 Data Driven
The insight gained from data analytics will support service delivery and inform how we
manage ICT technology assets.
Making use of data and technology for transformational change to provide insights and
solutions to enable the Council to improve efficiency, reduce costs, and make data-driven
decisions, resulting in better outcomes for our citizens.
5.4.1 Progress up to 2021
• IT asset and user management suite built using Power BI and data from SCCM (Microsoft
System Centre Configuration Manager), Azure API, Active Directory and Chris21
• Data and information platform built on SharePoint and Power BI to report on: Workforce
information, Finance information and Streetscene performance.
• Integration built between Chris21, Active Directory and M365 using FME to allow quick
and accurate maintenance of user account and the data held within them.
• Implemented new Connects Intranet for staff based on MS Sharepoint platform.
5.4.2 Future Focus for 2021 - 2024
• Continue to leverage investment in PowerBi for provision of Management Information (MI)
and reports to assist with service provision, review, and enhancement.
• Enhancement and development of NAC (North Ayrshire Council) website to provide
customers with improved channels of access to Council services.
5.5 Secure
Operate securely whilst still taking advantage of technological innovations and
opportunities.
Cyber security is paramount for the Council, and we take a proactive approach to protecting
assets while also being prepared to respond to any security incidents which may have an
impact upon them.
5.5.1 Progress up to 2021
• Improved security controls implemented to protect assets include the deployment of
Sophos Central Anti-Malware software, monthly vulnerability management scanning &
resolution processes, and the introduction of new user authentication methods such as
passphrases and multi-factor authentication.
234

Page 235

6
• Training, awareness, and governance methods have all been revised to ensure the
development of a healthy security culture at all levels of the organisation.
5.5.2 Future Focus for 2021 - 2024
• Options to establish a Security Operations Centre (SOC) function capable of detecting and
responding to security events have been explored, a business case completed and to be
progressed with budget being identified.
• Improved Business Continuity and Cyber Incident Management plans and processes
implemented and tested to ensure staff and Services can deal with major incidents.
• Continuous focus on technologies, processes, techniques, and staff training to counter the
ever-present threat of sophisticated cyber-attacks.
6. Overview and List of our Key ICT Assets
ICT assets, used by over 6,500 staff and around 22,000 school pupils, are displayed in
the tables below.
Asset (Hardware) Nos
Estate
Replacement
Value
Refresh & Replacement Method of Monitoring
PCs & Laptops
3,000
Corporate
9,500
Education
12,500 Total
£4.87M
Desktop Replacement
Programme
Education ICT
Replacement Programme
Microsoft System Centre
Configuration
Manager (SCCM) and Intune
are used to monitor and
manage devices. In addition,
Education & Skills
monitor devices by inventory
at school level
Tablets/iPads
(Education) 3385 £820K
Schools iPads are managed
via a central
console using Airwatch
mobile device management
and inventories are held at
individual schools.
Servers & Storage 40 £800K
Virtualised server
technology is in place
decreasing the number
of physical servers
required.
VMWare and CommVault
management tools
Microsoft SCCM software
SolarWinds monitoring
software.
Contract reviews
LAN (Local Area
Network) Switches
WiFi Access Points
500
1000
£1.0M
£300K
Contract
in place for replacement and
upgrade of Local Area
Network (LAN) hardware
and WiFi Solution
Asset monitoring and
maintenance using Extreme
XiQ management tools and
SolarWinds monitoring
software.
Contract reviews
Mobile Phones / Smart
phones 2900 £600K
Contract in
place with Vodafone for mob
ile and smart phones
Vodafone Online Account
235

Page 236

7
IPT Telephony
Handsets 1200 £230K Contract in place for Fixed
Voice / IPT Cisco Call manager (CUCM)
Printers (MFDs -
(Multifunctional
Devices))
Maintained
by Services
MFDs are on
lease
agreement
Devices are leased by
individual Services. Contract
in place with RICOH
RICOH provided account
information
Asset (Software) Nos Estate Replacement
Value
Refresh &
Replacement
Method of
Monitoring
Microsoft Licences (Corporate)
M365 - 3,109 E3
Licences: Corporate
Staff
M365 -1320 F3
Licences: Care at
Home Staff
£590K/annum
£74k/annum
Ongoing Microsoft
M365 agreement
MS Licence
database
Microsoft Licences (Education)
A365: 1,866 Staff and
22,000 Pupils £92K/annum Ongoing Microsoft
Campus agreement
MS Licence
database
Asset (Rentals) Nos Annual Rental
Cost
Refresh &
Replacement
Method of
Monitoring
Data Circuits 190 £440K/annum
Contract in place for
replacement and
upgrade of Wide
Area Network
(WAN) data circuits
Capita Managed
Service
7. Current Asset Management Performance/Drivers for Change
7.1 How we manage our ICT Assets
Outlines how we manage our ICT assets and associated infrastructure.
7.1.1 Inventory Performance
Microsoft System Centre Configuration Manager (SCCM) and Intune management tools are
used for the inventory management and performance monitoring of the corporate and
Education personal computer devices and servers. Solar Winds is used to monitor the
performance of core network Infrastructure. Apple Airwatch is used to manage the education
estate of iPads.
7.1.2 Lifecycle Planning.
IT Services will ensure that new assets are sustainable and affordable, within agreed
budgets, for the whole life of the assets. Roadmaps and replacement plans will be
developed for ICT assets in support of continuous improvement and efficiency. IT Services
will assist services with retiral and disposal of ICT assets, thereby complying with legislative
and operational requirements.
7.1.3 Manage the Risks.
As our assets become older, increased resource is required to maintain them and there is an
increased risk of incompatibility and performance issues occurring. Furthermore, the impact
of maintaining old equipment not only increases the total cost of ownership but impedes the
236

Page 237

8 
ability to support service delivery and continuous improvement. A programme of on-going
maintenance and replacement of ICT assets is required to mitigate these risks.
7.1.4 Support & Maintain.
Currently the council’s laptop and desktop estate are managed using SCCM and Intune for
Windows 10 devices and smartphones, these tools ensure appropriate windows updates are
applied, also configuration or software changes can be pushed to our devices from these
tools ensuring we remain compliant.
7.1.5 Refresh and Replace.
Capital planning within the Council has a 10 Year horizon and IT Services must consider this
timescale in looking at plans, aspirations, and technologies.
IT Hardware and Software typically has a 3 to 5-year period of change given the speed of
development in the world of technology. Planning for desktop device replacement is based
on a 5-year cycle. Networking and Telephony is reviewed regularly and typically has a 5 to
7year cycle. 
8. Asset Management – Key Focus
8.1 Comprehensive asset management information is collected, maintained, readily
available and stored efficiently.
The Council’s IT service management system (ITSM) should be the central data store for
ICT asset management information. The system should be accessed and maintained by all
ICT staff. It should be integrated with desktop management tool/s to maintain
comprehensive information regarding hardware specification and software installed on the
PC and laptop estate.
Samanage / Solar Winds ITSM – end of life and requires to be replaced.
Information is identified and maintained relating to system lifecycles and replacement plans
roadmaps.
All business applications were assessed in terms of functionality, performance, availability,
and resilience during the 2018 Applications Review.
A programme of contract review and potential re-procurement is carried out in conjunction
with Procurement Services
8.2 Centralising purchasing and supply contracts for hardware and standard software.
All IT hardware and software is purchased through or in consultation with ICT. A central list
of all ICT contracts is maintained, and specific budgets identified for hardware and software
annual licence, support, and maintenance costs.
8.3 Exploiting appropriate e-Procurement, legal and framework agreements for
hardware and software.
Scottish and UK procurement frameworks used whenever they are available and provide
best value. Most hardware is purchased from Scottish Government framework agreements
including PCs, Laptops, Tablets and Mobile Phones.
237

Page 238

9
8.4 Ensure all new hardware and software is thoroughly tested to ensure technical
and operational compliance.
Roles and responsibilities are divided between Customer Support and Operational teams.
Standard change management processes are in place to ensure that all significant changes
to the live operational environment are tested and approved before being deployed.
8.5 Minimising operational overheads and annual running costs
All contracts are reviewed on a regular basis to ensure they continue to represent best value
for the council. Reviews are carried out in conjunction with the Corporate Procurement
Service.
Standardising on the Microsoft 365 suite of office productivity software and desktop
management tools has helped to streamline IT process and improve user experience.
Various implementation projects are currently underway which will upgrade or replace key IT
infrastructure and network components.
8.6 Ensuring backup/recovery of systems and disaster recovery of critical systems.
Comprehensive backups are available for all business-critical systems. A secondary data
centre is in place, providing business continuity and disaster recovery facilities for various
key business systems and services and diverse internet connectivity is also in place. A
review of Backup / Storage is under way.
8.7 Ensuring appropriate information security (availability, integrity, and
confidentiality)
The council complies with the requirements of connection to the Public Services Network
(PSN). Policies, procedures, technical architectures, and system security are assessed and
accredited on an annual basis.
Cyber Security initiatives include enhancing the Council’s protective monitoring capabilities,
reviewing the benefits of a specific cyber insurance policy, and implementing further security
controls in line with the Scottish Government’s Cyber Resilience Framework.
9. Future Service Delivery Aspirations/Challenges
9.1 Future Development – 2021-2024
• Investment in Microsoft M365 has allowed the roll-out of Windows 10 across the desktop
estate with a planned move to Windows 11 when appropriate. This goes together with
the Desktop Replacement programme which is seeing older devices replaced with
Windows 10 / Windows 11 compatible hardware. M365 is also allowing for the increased
use of Intune to manage the Desktop and mobile estate.
• Investment in the network allows M365 data traffic to break out directly to the internet
which reduces the burden on firewalls and data links.
• Investment in Telephony will help to support and sustain agile working by providing
Softphone access which brings the desktop phone to the laptop and makes it mobile.
• Sophos Intercept X software deployed to Corporate and Education IT estates to help
maintain and improve mitigation of cyber security threats.
• Ongoing data centre replenishment including replacement of core switches; upgrade of
back-up and recovery solution.
238

Page 239

10
• Reduction in capacity requirements over time through migration of corporate files and
data to Microsoft Sharepoint in the cloud
9.2 Capital Investment
ICT Capital Investment Arrangements and 10 Year Investment Strategy
• Highlights key areas of expenditure across ICT asset types along with the mechanisms
in place for project investment inclusion within the Capital Plan
• IT Services has a current Capital programme 21/22 in place totalling £2.27M enabling
the Council to continue to develop its ICT assets. The table below details the key
technology areas of budgetary spending.
• Over the last three years there has been investment in a wide range of projects to
enhance and improve the use of assets enabling the reduction and replacement of
legacy hardware and providing increased performance of the Council’s ICT assets.
ICT 10 Year Capital Programme
Investment
Areas
21/22
£
22/23
£
23/24
£
24/25
£
25/26
£
26/27
£
27/28
£
28/29
£
29/30
£
30/31
£
Total
Capital
£
ICT
Investment
Fund
481,000 255,000 288,400 382,400 376,600 702,600 297,600 282,600 282,600 297,600 3,646,400
WAN
(Wide Area
Network)
228,382 500,000 728,382
LAN
(Local Area
Network)
& WiFi
1,153,582 1,500,000 2,653,582
Telephony 409,554 650,000 1,059,554
Schools ICT
Investment
1,234,000 752,000 752,000 752,000 752,000 752,000 752,000 752,000 752,000 752,000 8,002,000
239

Page 240

11 
10. Action Plan 
Action
Plan
Reference
Action Desired
Outcome
Lead Timescale
ITAMP 1 PCRP –
Corporate
Desktop estate
is regularly
refreshed to
ensure that
most up to date
and secure
versions of
hardware and
software are
deployed
Carolann McGill Ongoing -
five-year
replacement
cycle
ITAMP 2 PCRP -
Education
Desktop estate
is regularly
refreshed to
ensure that
most up to date
and secure
versions of
hardware and
software are
deployed
Carolann McGill Ongoing -
five-year
replacement
cycle
ITAMP 3 LAN Refresh LAN hardware
replaced with
latest industry
standard
devices to
provide robust
and secure
connectivity
with reduced
device numbers
James McNeil March 2024
ITAMP 4 Hornbill ITSM
Asset
Management
ITSM software
added value
features are
exploited to
support lifecycle
inventory and
management of
assets
Carolann McGill March 2024
ITAMP 5 Digitisation of
Telephony for
2025
Understand
options for
replacement of
analogue phone
lines in advance
of UK 2025
switch to digital
lines
Carolann McGill December 2025
240

Page 241

1
241

Page 242

1
ASSET MANAGEMENT PLAN
OPEN SPACE
242

Page 243

2 
1. Introduction 
The Open Space Asset Management Plan (OSAMP) sets out the Council’s approach for the
management and maintenance of all open space assets. This plan complements and should
be read in conjunction with the Open Space Strategy 2016 - 2026.
Streetscene’s approach to Asset Management Planning is based on the guidance given by
CIPFA in their document “A Guide to Asset Management Planning and Capital Planning in
Scottish Local Authorities” which has been endorsed by the Scottish Government. CIPFA
updated the guidance and published ‘A Guide to Local Authority and Public Sector Asset
Management’ in November 2020. North Ayrshire Council’s governance of Asset
Management Planning was approved on 29 March 2011. 
2. Aims & Objectives 
The Open Space Asset Management Plan identifies how it will contribute to ‘Our Council Plan
2023 - 28’ to help achieve the Council’s vision ‘A North Ayrshire that is fair for all’ and mission
of ‘Working together to improve the lives of our people in North Ayrshire.’ 
The effective and efficient management and maintenance of the Council’s open space assets
contributes towards the Council’s priorities of: 
• A Sustainable Council
• Climate Change
• Wellbeing
• Communities and Local Democracy 
The key objective of the OSAMP is to ensure the Council’s assets are fit for purpose and
managed effectively and efficiently.
Open Space can be defined as:-
‘Any open space which provides, or has the potential to provide, environmental, social
and/or economic benefits to communities, whether direct or indirect, within and around urban
areas. It includes greenspace and hard landscaped areas with a civic function, as well as
aquatic open spaces’. 
3. General Description of Assets 
Type of Asset Number / Size
/ Area
Purpose / Use
Local Parks 14 These are areas which are well maintained for
public enjoyment of the natural heritage and the
provision of formal and informal recreation
opportunities.
Country Park 1 Provides an opportunity for all to participate in
outdoor activities such as walking, cycling, horse
riding and fishing. It also provides an inspirational
educational environment giving an opportunity to
243

Page 244

3
those wishing to learn about history, geography
and the natural world.
Cemeteries and Burial
Grounds
44 To ensure we have the capacity to bury the dead
in a well-managed and safe environment. To meet
our statutory obligation to maintain these sites
some of which are of historical significance both
locally and nationally.
War Memorials and
Monuments
37 (23 War
Memorials and
14
Monuments)
We will repair and protect our war memorials and
monuments. In accordance with the War Memorial
(Local Authorities Powers) Act 1923.
This power extends to the alteration of memorials
to commemorate the fallen of any conflict.
Civic Spaces Information not
available
Maintain the existing public realm/civic space and
support the development of existing and new sites
in line with the Local Plans and the Town Centre
Regeneration Strategies. By doing this we will
stimulate and develop our towns and villages
thereby promoting economic prosperity.
Trees and Woodlands 275 hectares Woodlands are managed in accordance with North
Ayrshire Council’s Tree & Woodland Management
Policy (2012).
Hedges and
Hedgerows
110,340 linear
metres
Hedges & Hedgerows act as green barriers to
roads and create a habitat for native flora and
fauna.
Allotments and
Community Gardens
4 Encourage local communities to develop allotments
and community gardens. We have community
groups actively pursuing allotment sites.
Sports Areas
(including sports
pitches, tennis courts,
putting greens and
bowling greens)
94 By continuing to improve sports areas both natural
and non-natural surfaces we will encourage
residents and visitors to participate in sport.
Play Areas (including
MUGAs)
107 play areas
9 MUGAs
(31 additional
play areas
within schools)
Providing safe and accessible opportunities for
children to play. By promoting and encouraging the
use of open space for play and adventure we
create an opportunity for children to become active
and healthy.
Benches including
picnic benches
1,079 For general seating purposes to enable people to
take a rest or to sit to read, take in a view or have a
picnic safely. Bench type and design is influenced
by the location and its purpose.
Litter bins and dog
waste bins
1,386 and 555 To enable  our  residents and visitors to comply
with the law when disposing of litter and dog waste
and promoting responsible behaviour. Both types of
receptacles enable our streets to remain free of
244

Page 245

4
litter and dog waste thus creating healthy attractive
environments.
Planters 137 To provide floral displays to enhance our towns and
civic amenity spaces.
Fences and barriers
(including bollards)
Information not
available
To prevent or restrict movement across a boundary
for safety reasons. Some fences are decorative
and serve not only as a boundary but enhance a
park or landscape feature including war memorials.
Water courses and
Water Bodies
38 Our rivers and inland waters offer a range of
opportunities for non-motorised water-based
activities and wildlife. The water courses are
managed as per North Ayrshire Council’s Water
Safety Policy (2021).
Promenades 5 Used by residents and visitors for exercise and
general recreation.
Beaches 16 North Ayrshire has an extensive coastline that is
used for a wide range of outdoor activities as well
as educational purposes.
A Data Management Review Plan has been created to record inventory data, storage,
updating and validation processes.
4. Current Performance / Drivers for Change
The following documents are produced to support the asset management process and are
reviewed and regularly updated.
Open Space Strategy 2016 - 2026
This will deliver through partnership working, open spaces that are inclusive, accessible and
‘fit for purpose’ enhancing the quality of life for residents in North Ayrshire and visitors to
North Ayrshire. This was approved by the Cabinet on 22 November 2016.
The 6 key strategic objectives of the Open Space Strategy are:
• Open Space will be promoted as a resource for tourism and recreation, economic
development & biodiversity.
• Help reduce local inequalities by ensuring that all communities have access to high
quality, well equipped clean and safe open space.
• Promote better health by providing diverse opportunities in open spaces, the natural
environment and countryside for physical exercise, sport and recreation.
• Protect and enhance all areas of nature conservation value, in particular historic
features, sensitive habitats and special landscapes.
245

Page 246

5 
• Improve the perception, quality and range of recreational and tourism facilities in the
open space areas.
• Respond to climate change through the delivery of a connected and integrated
network, incorporating water management, woodland area and biodiversity benefits. 
Open Space Asset Management Plan – records the service standards for each asset
group, identifies risks, and reflects local requirements, customer preferences and current
investment strategies.
Data Management Plan – records methods for collection, validating and updating of asset
data and an action plan for improvements regarding estimated or missing data.
Performance Reports – Local Environmental Audit and Management System (LEAMS) and
Land Audit Management System (LAMS) results. 
5. Condition and Suitability 
Strategic Approach – adopting a strategic approach to maintain and renew the asset and
make best use of available resources for the long- term benefit of the asset.
Optimal Allocation of Resources – investment is allocated to prioritise the delivery of
corporate objectives and to provide best value to our customers. Asset management
provides a framework for this process by identifying and prioritising needs across the open
space as a whole. Lifecycle planning is used to minimise whole life costs to ensure efficient
and effective use of resources.
Customer Focus – takes into account the needs and expectations of customers is
addressed by developing appropriate levels of service for each asset and incorporating a
Participatory Budgeting approach for part of the ground’s maintenance activities.
Through prudent asset management, North Ayrshire Council will make best use of available
resources in maintaining its open space and associated infrastructure.
Environmental factors contribute to the demands placed on the Open Space asset
management.
Climate change – changeable weather conditions with severe weather extremes are
becoming more common. This can result in deterioration of the Open Space Assets and our
ability to maintain them to the highest standard.
There are inspection regimes in place to ensure that assets are fit for purpose. These
inspection regimes are further used to allocate resources and inform future investment
programmes. The inspection regimes include the following key activities:-
Cleanliness and Maintenance Standards
The success of the cleanliness and maintenance regime is measured through the following
mechanisms:-
Local Environmental Audit and Management System (LEAMS)
Currently, three inspections per annum of a 5% cross-section sample of streets within the
area are assessed against the standards set down in the Code of Practice on Litter and
246

Page 247

6 
Refuse (Scotland) 2018 issued to fulfil the duties under the Environmental Protection Act
1990.
Play Areas
In line with guidance set by the Royal Society for the Prevention of Accidents (ROSPA), the
condition of play areas and equipment within the area are assessed on a weekly basis. This
regime is supplemented by a detailed annual assessment undertaken to inform the
programme to replace equipment and any other works that may be required to the play
areas.
Street Furniture
Assets are informally assessed by Streetscene Officers and Operatives as part of the
cleansing maintenance scheduled and replaced on an ‘as required’ basis. The location and
type of each asset has been mapped on the Council’s Geographical Information System
(GIS). This information will be utilised to inform a formal inspection and replacement
programme.
Trees and Woodlands
Assets are currently inspected on a reactive basis following reports of potential hazards.
Following inspection any appropriate arboriculture works identified are undertaken. An
inspection regime of trees along North Ayrshire’s A-class road verges began in Autumn
2018. The inspection of Roadside trees is an obligation for Roads under the Roads Scotland
Act 1984 and is supported by the councils Tree and Woodland Management Policy.
Water Features
Safety equipment and measures to restrict access are provided in line with ROSPA
guidance and inspected on a weekly basis. Any works required at this time are undertaken
as a matter of urgency. Formal inspection of water courses is undertaken in consultation with
the Scottish Environment Protection Agency (SEPA).
Allotments
Allotments and community gardens form part of the open space provision. North Ayrshire
Council does not directly manage any of the allotment sites, however, we actively support
the four allotment organisations who lease and occupy Council land. 
As part of the Council’s Open Space Strategy and Allotments Policy, we monitor demand for           
allotments and actively seek to identify new sites for food growing where required. We also           
encourage and support communities to take part in food growing. 
Infrastructure
Updated surveys have been carried out on cemetery infrastructure and an action plan is
being implemented with the recommendations from these surveys, the Cemetery Capital
Plan.
Memorial Testing
In line with guidance issued by the Health and Safety Executive (HSE) the Council
commenced a rolling five-year programme to inspect and take appropriate action to ensure
the stability of the 70,000 memorials currently present within its cemeteries. This is an
ongoing programme.
247

Page 248

7
War Memorials
The Council has a duty under the War Memorial (Local Authorities Powers) Act 1923 to
ensure the maintenance repair and protection of War Memorials within its control.
Streetscene Management/Maintenance Programmes
In managing and maintaining the Council’s Open Space and associated assets, the
Council’s Streetscene Service operates to agreed service standards. These standards are
published on the Council’s external website.
6. Sufficiency (i.e. asset demand)
North Ayrshire Council has a procedure in place for recording and dealing with complaints.
Details of general enquiries are recorded in the Lagan (Verint) System. This information
highlights numbers of specific types of fault or faults occurring in a geographical area.
A number of reporting forms have also been developed to enable customers to report
problems, issues or faults for the following: overflowing street bin or dog bin, street litter,
waste safety equipment or signage, litter, flytipping, flyposting, graffiti, abandoned vehicles.
North Ayrshire Council also has representatives who attend various meetings to ascertain
views and/or requirements – e.g. North Ayrshire Access Panel, Community Groups and
Estate Based Inspections. Representation is made by Streetscene (Operations and
Strategy) at Estate Inspections arranged by Housing services.
Responses are also sought via the North Ayrshire Community Planning Partnership People’s
Panel that is comprised of 2000 representatives of the population of North Ayrshire. The
People’s Panel is carried out every 2 years.
In 2018, Streetscene conducted an Open Space Satisfaction Survey to provide North
Ayrshire residents with an opportunity to comment on and provide feedback on North
Ayrshire’s parks, green spaces, and open areas. A total of 434 residents responded to the
survey. Overall, 71% of respondents were either very satisfied or satisfied with North
Ayrshire parks, beaches, and open spaces.
In 2017, Streetscene was integral to North Ayrshire Council’s Participatory Budgeting
activity, by offering the community an opportunity to influence part of the grounds
maintenance budget.
This Participatory Budgeting consultation approach enabled communities to identify local
priorities and needs and to shape some grounds maintenance activities to meet these
aspirations.
During 2021, a playpark consultation was carried out as part of the playpark improvement
funding programme across North Ayrshire. Over 500 responses were received, and this
feedback helped to ensure that the playpark improvement funding was utilised to meet the
needs of the local communities. Streetscene has identified a replacement programme for the
allocated playpark monies, and carried out member consultation across all 10 ward areas
with elected members.
Consultation is undertaken through the Locality Partnerships for local people within
communities; set in North Coast and Cumbrae, Three Towns, Garnock Valley, Arran,
Kilwinning and Irvine. This assists in identifying and addressing local issues, sets out
priorities for each locality and how they will be addressed within a developed Locality Plan.
248

Page 249

8 
On the North Ayrshire islands, we also work closely with Arran Community Council, Visit
Arran, Cumbrae Community Council, Garrison House Cumbrae and other key stakeholders
to consult on works programmed to be undertaken on the Island of Arran and Cumbrae so
that any concerns are addressed. 
7. Financial
The Council incurs an annual revenue expenditure of £5.188million for 2023/24 in the
maintenance of approximately 2,410 hectares of open space, consisting of:
• 1 Country Park
• 14 Local Parks
• 116 Equipped Play Areas & Multi Use Games Areas (MUGAs)
• 94 Sports Facilities and Playing Fields
• 44 Cemeteries and Burial Grounds
• 23 War Memorials
• 14 Monuments
• 275 hectares of Woodland
• 4 Allotments
• 38 Water Courses and Open Water features
• 16 Beaches - 3 are Sites of Special Scientific Interest (SSSI)
• 5 Promenades
• Residential Greenspace
• Street Cleaning 
There is a range of amenities within the Council’s Open Space, with an estimated
replacement value in excess of £3.5million, these are noted below:
• Play Equipment
• Sports Facilities, such as goal posts, nets etc.
• Benches/Picnic Tables
• Planters
• Fences, Barriers & Bollards
• Litter and Dog Waste Bins
• Memorials 
The nature of Open Space is such that a financial value cannot be accurately calculated for
all assets. However, the provision of high-quality Open Space can enhance the value of
adjacent land and areas.
Valuations can be undertaken on an individual basis should planning policies permit a
change in designation or where an enquiry in respect of potential purchase is received.
Capital - This is planned on a 10-year basis. Capital funds are profiled dependent upon
when the works are required. 
249

Page 250

9 
8. Legislation 
Legislation changes can lead to increased demand on Local Authorities’ resources in
managing their assets.
• Environmental Protection Act 1990
• Burials and Cremation Act (Scotland) 2016
• Community Empowerment (Scotland) Act 2015
• War Memorial (Local Authorities Powers) Act 1923
• Wildlife and Countryside Act 1981
• Health & Safety at Work Act 1974
• Occupiers’ Liability (Scotland) Act 1960 
9. Policy / Guidance
The Council has a range of plans, policies and strategies in place to inform and co-ordinate
the provision, management and maintenance of its Open Space. These set out the approach
of the Council in response to national policy and legislation as well as the delivery of
objectives expressed locally by the community. These documents include:-
• Open Space Strategy
• Litter, Flytipping & Dog Fouling Prevention Strategy
• Tree & Woodland Management Policy
• North Ayrshire’s 2030 Woodland: A Tree Planting Strategy
• Water Safety Policy
• North Ayrshire Food Growing Strategy
• Children’s Play Strategy “The State of Play in North Ayrshire”
• Local Planning Policies 
10. Health and Safety 
The Health and Safety at Work etc. Act 1974 (also referred to as HSWA, the HSW Act, the
1974 Act or HASAWA) is the primary piece of legislation covering occupational health and
safety in Great Britain. The Health and Safety Executive, with local authorities (and other
enforcing authorities) is responsible for enforcing the Act and a number of other Acts and
Statutory Instruments relevant to the working environment. In order to comply with these
Health and Safety responsibilities the authority has in place several inspection processes
that are undertaken. These include: 
• Water Safety Equipment
• Play Facilities and Equipment
• Asset Condition checks
• Tree Surveys 
These processes dovetail with the relevant policies to ensure residents and visitors can enjoy
our open spaces in a safe manner.“ 
250

Page 251

10 
11. Risk Management 
This section summarises how the Council’s risk management strategy is applied to the
management of the open space asset. It identifies where risks associated with the open
space asset are recorded, identifies the major risks associated with the asset and outlines
how they are currently being controlled.
Risks are currently identified through formal and informal inspection and customer reporting. 
Risk Categorisation - The level of risk associated with Open Space are identified through
inspection and customer reporting. The assets are then categorised and priority repairs are
carried out accordingly.
Risk Control - Risks within the Open Space are controlled by carrying out inspections and
maintenance in accordance with Codes of Practice, adherence to the council’s policy and
compliance with the Open Space Strategy.
Monitoring and Reporting - Risk is continually monitored by the Streetscene management
team. The Executive Leadership Team receive quarterly risk update performance reports
through Pentana.
Risk Register - Top level risks for the Place Directorate are contained within the Directorate
Plan. 
12. Governance of the assets
Any missing or uncaptured assets will be highlighted in the Streetscene Data Management
Plan. This records methods for collection, validating and updating of asset data and an
action plan for improvements regarding estimated or missing data will be produced.
Environmental factors contribute to the demands placed on the Open Space asset
management.
Climate change – changeable weather conditions with severe weather extremes are
becoming more common. This can result in deterioration of the Open Space Assets and our
ability to maintain them to the highest standard. 
13. Service Delivery Aspirations / Challenges 
Investment is planned to coincide with asset conditions and future needs. For example,
predicting investment in cemeteries is based on asset condition survey information and the
capacity of current cemeteries, necessitating an extension. This data is invaluable in profiling
the capital budget to ensure it is targeted at the right asset, at the right time.
However, predicting the investment required in open space is more difficult as there are
outside factors out with Streetscene’s control such as climate change that can affect the
longevity of assets or result in emergency works.
This is mitigated by having a robust inspection regime in place and will help plan our future
needs and reduce risk. Regular ongoing maintenance of assets, such as play equipment,
also increases the longevity of assets and the planned replacement programme. 
251

Page 252

11
Investment - Asset Types
Based on historical information, condition surveys, inspection reports and new funding
streams, planned investment is as follows:
Cemeteries: Investment in extending cemeteries (in accordance with the Council’s approach
to cemeteries and localities), wall repairs, improvements to pathways.
Play Equipment: Weekly inspections and regular maintenance will inform when play
equipment reaches end of life and needs assessed.
Furthermore, in 2021/22, a total of £500,000 was invested by North Ayrshire Council and in
2022/23 two grants for £118,000 and £117,000 were received from the Scottish Government
for the improvement and development of existing play facilities across North Ayrshire. Rather
than replacing like for like equipment, consideration will be given to items that are more
suitable for use by multiple service users.
Further investment from Scottish Government has been allocated for 2023 -2026 to support
the renewal of play parks across North Ayrshire Council.
The capital allocation received from the Scottish Government is as follows:
Capital allocation for 2023/24: £231,000
Capital allocation for 2024/25: £347,000
Capital allocation for 2025/26: £578,000
Street Furniture: Formal and informal inspections will help determine future needs.
Furthermore, in 2021/22 an investment fund of £250,000 was allocated to renew and
improve street furniture assets such as bins, benches and picnic tables. Consideration will
be given to accessibility for those with restricted mobility and wheelchair users.
Open Space: Inspections and audits will inform the investment required.
Woodlands: Inspections will inform the investment required. The Council’s Tree &
Woodland Management Policy sets out the circumstances during which trees could be
removed or pruned.
North Ayrshire’s 2030 Woodland: Investment of £500,000 was provided to plant
approximately 108,000 new trees by 2030 to help positively contribute to Climate Change. A
Tree Planting Strategy will also inform the sites to be selected for new planting areas and
woodlands to be created. This will include fruit trees to create orchards, in suitable
locations, for community benefit.
The Open Space maintenance schedule helps ensure structures are kept in a serviceable
condition.
The methodology used to allocate Revenue and Capital funding is outlined below.
Revenue
Works carried out under the revenue budget are generally reactive and routine works
identified through the inspection regime and/or reported defects from the public.
Works identified, where there is insufficient budget to immediately carry out repairs and
252

Page 253

12 
where they are not prioritised due to safety reasons, are recorded to be completed as and
when funding is available in line with overall priorities.
Funds are allocated to routine preventative and corrective works identified through
inspections. Any reduction in the funding of routine maintenance will accelerate the rate of
deterioration of the asset. 
14. How assets will be used in the future 
Open Space is acquired by the Council in three principal ways:-
• Direct purchase to support a specific Council objective, e.g. regeneration of an area,
or service delivery need e.g. to construct a new cemetery. 
• Development of vacant or derelict land within the Council’s ownership to support a
specific Council objective or service delivery need. 
• Through the planning process as part of the conditions of development e.g. a play
park within a new residential development. 
The general availability of vacant and derelict land within the area has enabled the Council
to retain high levels of open space and avoid disposal unless a particular area can contribute
to the realisation of a wider corporate objective.
Any requests to purchase or transfer land or where the Council wishes to dispose of land to
support a corporate objective will be considered in line with the Council’s Policy for Property
Acquisition and Disposal. In order to support the empowerment of local communities the
Council also has a policy to support the appropriate transfer of assets to community bodies.
This is in accordance with the Community Empowerment (Scotland) Act 2015. Streetscene
is represented on the Council’s Community Asset Transfer (CAT) Officers group.
Equipment and facilities within the Open Space are subject to an inspection programme and
will be assessed for future use purposes or replaced when they reach the end of their safe
working life. These assets are then disposed of in accordance with the Council’s Standing
Orders Relating to Contracts and Contract Procedure Rules.
The acquisition of assets is undertaken in line with the Council’s Planning Policies and Policy
for Property Acquisition and Disposal.  
253

Page 254

13 
The Open Space Asset Management Plan sits within a strategic document framework shown
in the diagram below: 
15. Performance Indicators
Cleanliness standards
The Code of Practice on Litter and Refuse (Scotland) 2018, issued under the Environmental
Protection Act 1990, defines the maximum response times when a litter problem is reported
within or to a local authority. Once the new COPLAR is operational, the standard of street
cleanliness, assessed in terms of ‘litter’ will be measured using 6 categories graded as A, B,
C, D, E & F. 
Grades
A - No litter or refuse is present on any type of land
B - Small amounts of litter and refuse
C - Moderate amounts of litter and refuse, with small accumulations
D – Significant amounts of litter and refuse, with consistent distribution and accumulations
E – Substantial amounts of litter and refuse with significant accumulations
F – Incidents of Flytipping and hazardous/special waste (drug related waste, broken glass,
animal carcasses, car parts, chemicals and spillages) 
Response times – Duty 1
(keep land clear of litter and refuse)
The COPLAR (2018) Duty 1 response times are structured as four bands that recognise
duty bodies’ (the Council) investment in prevention.
254

Page 255

14
It reflects that effective measures increase the likelihood of zones being cleaner for longer,
which reduces the need for rapid restoration.
Streetscene endeavour to maintain all sites to an acceptable’ standard (Grades A and B),
and to address un-acceptable Grades (Grades C-F) within the response times as set out in
the COPLAR (2018).
In summary, these maximum response times will only ensure minimum
standards as defined by the Code of Practice on Litter and Refuse (Scotland) 2018.
The operational hours of working during the year are as follows:
• Shift teams: 06.30 to 17.30
LEAMS / COPLAR Update:
Since the new COPLAR was introduced in 2018, the intention was for Zero Waste Scotland
to introduce a new monitoring methodology (to replace the current LEAMS model) which
would be suited to carrying out audits which encompassed all land under the responsibility of
the local authority, and not limited to roads and footways. However there has been a delay
on finalising a suitable system. Therefore at present, while the methodology has been
changed to enable use of the new LMS (Litter Monitoring Survey) app, surveys are still
restricted to streets (as opposed to all land). An overall Cleanliness Score is still published
as per the LEAMS model, based on the percentage of streets achieving an ‘Acceptable’
Grade of A or B.
16. ACTION PLAN
Reference
Number
Action Desired Outcome Lead Timescale
OSAMP_A01 Maintain a list of all
Streetscene Open Space
assets to provide a
comprehensive asset
inventory and record
asset changes in ArcGIS.
Access to an up-to-date list
of assets to ensure all open
space assets are recorded
and monitored effectively.
Streetscene
Strategy / Assets
Ongoing
OSAMP_A02 Review existing Asset
Management Planning
and Inspection process to
inform future replacement
and investment
opportunities for open
space assets.
Develop an efficient
inspection and recording
process (with the option of
considering new technology)
to meet Streetscene’s
strategic and operational
asset management
responsibilities for open
space assets.
Streetscene
Strategy /
Streetscene
Operations /
Assets
Ongoing
255

Page 256

15
OSAMP_A03 Implement the actions from
the Streetscene
Volunteering Strategy and
encourage the Adopt a
Spot initiative.
Framework in place to
support and extend the
existing network of
community volunteers.
Streetscene
Strategy
March 2026
OSAMP_A04 Assess the risks of
climate change on open
space assets.
Develop a plan to mitigate
any anticipated risks from
the impact of climate change
and changing weather
conditions.
Streetscene
Strategy /
Streetscene
Operations
Annual
OSAMP_A05 Continually monitor and
assess the suitability of
the capital and revenue
budgets in accordance
with Asset Management
approach.
Effective and efficient use
of budgets.
Streetscene
Strategy /
Streetscene
Operations
Annual
OSAMP_A06 Work with external funding
organisations to obtain
funding for projects that
will result in improvements
to the condition and quality
of open space assets.
Partnership working to fund
bespoke projects.
Streetscene
Strategy /
Streetscene
Operations /
External
organisations
Ongoing
256

Page 257

NORTH AYRSHIRE COUNCIL 
26 September 2023 
Cabinet 
Title:    Vacant and Derelict Land Strategy 2023-2028 
Purpose:  To seek approval for the Vacant and Derelict Land Strategy 2023
– 2028 
Recommendation:  That Cabinet approves the Vacant and Derelict Land Strategy
2023 – 2028, provided at Appendix One 
1. Executive Summary 
1.1 The regeneration of vacant and derelict land plays a key role within the priorities of the
Council Plan, Community Wealth Building Strategy and Regeneration Delivery Plan. A
key objective of these is to utilise land and assets to support wellbeing in local
communities. Tackling the significant legacy of vacant and derelict land by working
with communities to bring it back into positive use is key to this agenda. 
1.2 The proposed North Ayrshire Vacant and Derelict Land Strategy 2023-2028, for which
this report seeks consideration, examines how vacant and derelict land fits within, and
supports the wider context of National and Local priorities and objectives. It also
includes a series of actions to promote the positive re-use of sites to address local
priorities, support change within communities and ensure our places and economy are
vibrant and inclusive. 
2. Background 
2.1 The Council Plan sets out the Council’s ambitions for North Ayrshire. This includes
active, inclusive and resilient communities, the transition to a wellbeing economy
delivering prosperity, wellbeing and resilience for local people alongside contributing
to tackling climate change. Utilising assets to support wellbeing in local communities
by bringing vacant and derelict land back into positive use has a significant role in
achieving these priorities and tackling inequalities. 
2.2  The Community Wealth Building (CWB) Strategy seeks to develop resilient, inclusive
local economies, with more local employment and a larger and more diverse business
base. The Land and Assets pillar of CWB recognises that the underutilisation of land
and assets represents missed opportunities for towns and communities to achieve
their full potential. The Regeneration Delivery Plan sets out priorities for delivering on
the regeneration ambitions. It focusses on the delivery of physical regeneration across
North Ayrshire through an ambitious project based rolling action programme. It informs
Agenda Item 7
257

Page 258

our priorities for securing and delivering against external funding sources including
Scottish and UK Government funds. 
2.3  North Ayrshire has 12% of all vacant and derelict land in Scotland, one of the highest
proportions of any Scottish Local Authority. Combined, the Scottish Vacant and
Derelict Land Register and Buildings at Risk Register identify over 250 sites, mostly in
private ownership, which require redevelopment. These are often subject to a legacy
of issues including undermining, contamination, deterioration, or major industrial
closures. Whilst there are several reasons for a lack of redevelopment including
economic, locational, or physical constraints, a lack of financial viability remains a
common theme. 
2.4  The current Vacant and Derelict Land Strategy, adopted in 2014, has informed
priorities for delivery and the expenditure of the Council’s allocations under the
Scottish Government’s Vacant and Derelict Land Fund. Progress has been made
towards the re-use of several sites, including steps to regenerate Strategic
Development Areas identified in the North Ayrshire Local Development Plan.
However, many sites have a substantial negative impact on our communities and
represent local priorities for action. 
2.5  A refresh of the strategy has provided an opportunity to review the themes, aspirations
and challenges of vacant and derelict land in North Ayrshire. The proposed strategy
considers how vacant and derelict land fits within the wider context of national and
local priorities and objectives, including Community Wealth Building, the challenge of
net zero, and the climate emergency. It also provides a proactive approach to
addressing long term sites, tackling the challenges and constraints in relation to
encouraging landowner action and undertaking enforcement. 
2.6  Development of the strategy has been informed by consultation with stakeholders and
local communities. The negative impact of vacant and derelict land and buildings, to
the detriment of the environment, economy and community was highlighted through
this process. The proposed strategy has also been informed by recent research into
the issue of vacant and derelict land. This includes research by the Scottish Land
Commission, who have published a series of recommendations. It has also been
reviewed by the Economic Policy team to ensure alignment with Community Wealth
Building principles. It was also considered by the Policy Advisory Panel on 14 August
2023. 
2.7  The proposed strategy includes a series of actions to promote the positive re-use of
sites such that: 
• actions are prioritised towards those sites of greatest impact to communities and
support the creation of sustainable places, with the application of transparent
assessment criteria;
• communities are empowered and supported to tackle vacant and derelict land, on a
temporary basis, for example through a temporary ‘stalled spaces’ initiative, or
more permanently;
• potential end uses for sites are explored, ranging from development opportunities to
green space creation;
• the Council provides support for the development of vacant and derelict land as far
as possible, for example by supporting masterplans or feasibility studies for sites
258

Page 259

which have an uncertain history via the Council’s Repurposing Property Grant
Fund;
• information on sites is gathered by the Council and, so far as possible, shared
amongst concerned parties including affected communities; and
• the Council will continue to utilise all available powers and support the development
of alternative approaches to achieve the outcomes identified in the strategy. 
2.8 If approved, the strategy will inform the expenditure of future allocations under the
Scottish Government’s Vacant and Derelict Land Fund and funding applications for
example to the Vacant and Derelict Land Investment Programme. 
3. Proposals 
3.1 That Cabinet approves the North Ayrshire Vacant and Derelict Land Strategy 2023-
2028, provided at Appendix One. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Vacant and Derelict Land Strategy 2023-2028 aims to support and maximise the
impact of the investment being made through the Ayrshire Growth Deal, Council’s
Capital Programme and the Strategic Housing Investment Programme (SHIP). It will
also inform our priorities for securing and delivering against external funding sources
including Scottish Government’s Vacant and Derelict Land Funding (VDLF),
Regeneration Capital Grant Funds (RCGF), Vacant and Derelict Land Investment
Programme (VDLIP) and Place Based Investment Programme (PBIP). 
Human Resources 
4.2 The Vacant and Derelict Land Strategy 2023-2028 will be delivered through existing
resources. 
Legal 
4.3 The legal implications of the Vacant and Derelict Land Strategy 2023-2028 actions will
be considered through their development. Legal interventions and agreements will be
developed on a project-by-project basis as required with support from Legal Services.
Mechanisms such as Compulsory Purchase Orders will be considered on a case-by-
case basis, where considered appropriate. 
Equality/Socio-economic 
4.4 The Vacant and Derelict Land Strategy 2023-2028 assists in meeting our socio-
economic duty as set out in the Fairer Scotland Duty. It will tackle long-term vacant
and derelict land and buildings, thereby reducing their levels and impact on
communities. It aims to build community wealth and tackle local deprivation through
the regeneration of our communities by maximising the potential of our land and
assets and those of anchor institutions. 
Climate Change and Carbon 
259

Page 260

4.5 The Vacant and Derelict Land Strategy 2023-2028 aligns with our Environmental
Sustainability and Climate Change Strategy workstreams of: Green Economy;
Transport and Travel; Natural Environment; Sustainable Operations; and Carbon
Absorption. 
Key Priorities 
4.6 The implementation of the Strategy will contribute to achieving the Council Plan
priorities and key activities of: Ensuring our places and spaces where we live, work
and visit are well maintained and accessible; Placemaking; Developing infrastructure
to support business growth; and Promoting new woodland creation and protecting our
green spaces to provide a natural resource for carbon sequestration. 
Community Wealth Building 
4.7 The Vacant and Derelict Land Strategy 2023-2028 aims to deliver on the Land and
Assets pillar, objectives and associated actions of the Community Wealth Building
Strategy. It will support equitable land development and the development of
underutilised assets for community use. 
5. Consultation 
5.1 The Vacant and Derelict Land Strategy has been informed by national policy and good
practice alongside community and stakeholder consultation. This has included
workshops with Elected Members and Council Services and two stages of public
consultation including in-person events, online and hard copy questionnaires. The
proposed strategy was also considered by the Policy Advisory Panel in August 2023. 
Russell McCutcheon
Executive Director (Place) 
For further information please contact Claire Fitzsimmons, Interim Senior Manager,
Regeneration, on 01294 315305. 
Background Papers
Vacant and Derelict Land Strategy, 2014
Cabinet Report – Vacant and Derelict Land Funding 2021/22, 15 June 2021 
260

Page 261

North Ayrshire Vacant and Derelict
Land Strategy 2023 - 2028
DRAFT 
261

Page 262

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028   
Contents DRAFT/ August 2023
CONTENTS
SUMMARY .................................................................................. 1
Themes and Actions for 2023 - 2028 ............................................. 3
INTRODUCTION ......................................................................... 5
Purpose ........................................................................................... 5
Definitions ....................................................................................... 6
Why does land become vacant and derelict? ............................... 7
Why vacant and derelict land should be tackled .......................... 8
Vacant and derelict land in North Ayrshire ................................. 10
PROGRESS ................................................................................... 12
Lochshore, Kilbirnie ............................................................ 12
i3 Irvine ............................................................................... 13
Ardrossan Coastal Quarter ................................................. 13
Quarry Road, Irvine ............................................................ 14
Annickbank Innovation Campus ......................................... 15
Repurposing Property Grant Fund...................................... 15
Residential Development .................................................... 15
Annual Site Review ............................................................ 15
DEVELOPING THE 2023 – 2028 STRATEGY .......................... 16
The National Policy Context ......................................................... 16
Scottish Government Policy ............................................... 16
The Local Policy Context ............................................................. 17
Listening to local communities and stakeholders ..................... 20
Learning From Others .................................................................. 22
Scottish Land Commission Vacant and Derelict Land
Taskforce ............................................................................ 22
Architecture and Design Scotland Stalled Spaces Programme
............................................................................................ 22
Centre for Local Economic Strategies (CLES) .................... 23
ACTION PLAN ........................................................................... 24
Principles ...................................................................................... 24
Themes and Actions ..................................................................... 24
Theme 1: Leading by Example ..................................................... 25
Theme 2: Identifying Priorities..................................................... 26
Theme 3:  Working with Others ................................................... 27
Theme 4:  Supporting Communities............................................ 28
Theme 5:  Information Gathering, Monitoring and Reporting .... 29
NEXT STEPS ............................................................................. 30
Delivery of the Action Plan & Progress Monitoring ................... 30
Collaboration ....................................................................... 30
Funding ............................................................................... 30
Future Strategy Review ................................................................ 31
REFERENCES ........................................................................... 32 
262

Page 263

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 1 DRAFT/ August 2023
SUMMARY
North Ayrshire has 12%1 of all vacant and derelict land in
Scotland, one of the highest proportions of any Scottish Local
Authority. 
Combined, the Scottish Vacant and Derelict Land Register and
Buildings at Risk Register identify over 250 sites, mostly in private
ownership, which require repurposing. These are often subject to
a legacy of issues including undermining, contamination,
deterioration, or major industrial closures. Whilst there are several
reasons for a lack of redevelopment including economic,
locational, or physical constraints, a lack of financial viability
remains a common theme.
Progress has been made towards the re-use of sites, including
steps to regenerate Strategic Development Areas identified in the
North Ayrshire Local Development Plan. However, many sites
have a substantial negative impact on our communities and
represent local priorities for action.
A refresh of the Vacant and Derelict Land Strategy, originally
published in 2014, provides an opportunity to review the themes,
aspirations and challenges of vacant and derelict land in North
Ayrshire. 
1 Scottish Vacant and Derelict Land Survey 2021 
Redevelopment of derelict land at Quarry Road, Irvine.
263

Page 264

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 2 DRAFT/ August 2023
The 2023-2028 Vacant and Derelict Land Strategy considers how
vacant and derelict land fits within the wider context of National and
Local priorities and objectives, including Community Wealth
Building, the challenge of net zero, the climate emergency, and the
Scottish Biodiversity Strategy. 
Significant research into the issue has been undertaken, in
particular by the Scottish Land Commission2, who have published
a series of recommendations which have informed this strategy.
The 2023-2028 Vacant and Derelict Land Strategy has been
informed by consultation with stakeholders and local communities,
who have highlighted the negative effect of vacant and derelict land
on the environment, the economy and community. The 2023-2028
strategy includes a series of actions to promote the positive re-use
of sites such that:
• Actions are prioritised towards those sites of greatest
impact to communities and support the creation of
sustainable places, with the application of transparent
assessment criteria.
• Communities are empowered and supported to tackle
vacant and derelict land, on a temporary basis, for example
through a ‘stalled spaces’3 initiative, or permanently. 
2 In 2018 the Scottish Land Commission and the Scottish Environment Protection
Agency (SEPA) established a national Taskforce to address the issue of vacant and
derelict land. Further details are available on Scottish Land Commission website.
• Potential end uses for sites are explored, ranging from
development opportunities, enhancing biodiversity, creating
green space and Nature Networks. 
• The Council provides support for the development of vacant
and derelict land as far as possible, for example through
simplifications to the planning process or ‘de-risking’ of sites
which have an uncertain history, for example through the
Council’s Repurposing Property Grant Fund.
• Information on sites is gathered by the Council and, so far
as possible, shared amongst concerned parties including
affected communities.
• Where necessary, the Council will continue to utilise
appropriate powers where other actions fail. 
3 See the Architecture and Design Scotland – Stalled Spaces website. 
New housing near derelict land near Ardrossan.
264

Page 265

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 3 DRAFT/ August 2023
Themes and Actions for 2023 - 2028
Theme 1: Leading by Example 
1. The Council will continue to promote existing large-scale
priorities and development of proposals for Council owned
VDL sites.
2. Detailed assessment of remaining Council sites will be
undertaken to identify the potential of sites, constraints, and
opportunities.  Remediation and management plans will be
developed for Council sites, including an anticipated timeline
for repurposing.
3. The Council recognises the contribution of its vacant and
derelict sites to biodiversity and will fully enhance and
develop their potential for biodiversity, Nature Networks and
green space.
Theme 2: Identifying Priorities 
4. The preferred or likely end use of VDL sites should be
established based on the Local Development Plan (LDP),
feasibility studies, or statutory approvals.  Sites more suitable
for naturalisation, contributing to Nature Networks and open
space provision should also be identified.
5. The development of assessment criteria will provide a
transparent means of prioritising action and resource for
vacant and derelict land. Priorities will be based on a range
of criteria, however the reasons for site prioritisation should
be clearly defined.
Theme 3: Working with Others 
6. The Council will continue to develop and implement the
Repurposing Property Grant Fund and investigate extending
its scope to overcome barriers to bringing sites back to
positive uses, subject to available funding.
7. The Council will gather information on land ownership, and
proactively engage with landowners to encourage the
appropriate management or restoration of sites to positive
uses, either permanently or on a temporary basis, and
identify the barriers to development.
8. The Council will work with partners in the public sector, for
example through the Ayrshire Community Wealth Building
Commission, to identify their intentions for the development
or re-use of vacant and derelict sites in their control.
9. The Council will prepare masterplans and development briefs
for priority sites, subject to funding and where appropriate
consider the implementation of Masterplan Consent Areas to
simplify the planning processes for appropriate forms of
development. 
265

Page 266

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 4 DRAFT/ August 2023
Theme 4: Supporting Communities 
10. Subject to the availability of funding, the Council will develop
a stalled spaces programme to promote the positive
temporary use of vacant and derelict sites and will work with
landowners to facilitate access to sites which are safe to
contribute to open space provision.
11. The Council will investigate the potential for a visual
improvement fund targeted at sites which are in very poor
condition, most affecting communities and in prominent
locations.
12. The Council will implement a mechanism by which
communities can easily highlight sites of concern, put forward
suggestions for the use of vacant and derelict sites and
comment on development briefs prepared by the Council.
13. The Council will provide support to communities who identify
opportunities for the purchase of abandoned land under Part
3A of the Land Reform (Scotland) Act 2003.
Theme 5: Information Gathering, Monitoring and Reporting 
14. The Council will continue to implement a programme of site
visits to monitor and record the status of all sites on the VDL
register, and those known to the Council with areas <0.1ha
which are of concern to communities.
15. The Council will maintain digital mapping for vacant and
derelict sites and consider how additional information may be
included, for example, the planning status of the site.
16. The Council will publish and publicise an annual summary of
the status of vacant and derelict land including sites added to
or removed from the register.
266

Page 267

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028   
Page 5 of 33 DRAFT/ August 2023
INTRODUCTION
Purpose
North Ayrshire includes one of the highest proportions of all vacant
and derelict land of any Scottish Local Authority. In 2021, 213 sites
were formally listed as vacant and/ or derelict, with a substantial
proportion of the population of North Ayrshire living within 500m of
a derelict site. Vacant and derelict land sites which require
development are mostly in private ownership. These are subject to
a legacy of issues including undermining, contamination,
deterioration, or major industrial closures. Whilst there are several
reasons for a lack of redevelopment or repurposing including
economic, locational, or physical constraints, a lack of financial
viability remains a common theme. 
In recent years progress has been made to restore vacant and
derelict land sites back to productive use, and the approach to
addressing vacant and derelict land in North Ayrshire has been
guided by the Council’s Vacant and Derelict Land Strategy which
was prepared in 2014.  The Council have received allocations of
close to £10m from the Scottish Government administered Vacant
and Derelict Land Fund since 2016, informed by the 2014 Strategy. 
The 2023-2028 Vacant and Derelict Land Strategy has been
prepared to align with current priorities, strategies and plans of the
Council.  Public consultation, emerging guidance, case studies,
examples of ‘best practice’, and success stories within North
Ayrshire have informed the refresh of the strategy.   
The 2023-2028 strategy provides an action plan to reduce the level
of vacant and derelict land in North Ayrshire. 
Vacant land in Beith used informally as open space.
267

Page 268

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 6 DRAFT/ August 2023
Definitions
Vacant and derelict land have specific definitions in the context of
how such sites are recorded by the Scottish Government.  The
2021 Vacant and Derelict Land (VDL) Survey defines vacant and
derelict land (and buildings) as follows:
Vacant land is land unused for the purposes for which it is held,
and which is viewed as an appropriate site for development. This
land must either have had prior development on it or preparatory
work must have taken place in anticipation of future development.
Derelict land (and buildings) is land which has been so damaged
by development, that it is incapable of development for beneficial
use without rehabilitation. In addition, the land must currently not
be used for the purpose for which it is held or a use acceptable in
the local plan. Land also qualifies as derelict if it has an un-
remedied previous use which could constrain future development.
Sites less than 0.1ha in size are not included on the Scottish VDL
register.
While the term ‘development’ is often used when referring to
positive outcomes for vacant and derelict land, forms of positive
change are wide ranging, including naturalisation, enhancements
for biodiversity, the creation of Natural Networks and green space.
Some sites in Scotland are referred to as DUSTEs, which are:
• Derelict – sites with identified barriers to re-use, such as
leftover buildings and materials, which are likely to be more
challenging to bring back into use than sites that are simply
vacant – and therefore in greater need of public support.
• Urban Sites – sites located within communities are more
likely to be causing harm to people nearby – and therefore
of higher priority for action than sites located in the
countryside.
• Unused since year 2000 or earlier – sites that have been on
the Register since at least 2000 can be regarded as ‘stuck’. 
268

Page 269

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 7 DRAFT/ August 2023
Why does land become vacant and derelict?
There are often many complex reasons why sites fall vacant or
derelict and remain so for an extended period of time.  Reasons
documented by the Scottish Land Commission4  Vacant and
Derelict Land Taskforce, and other bodies, include:
• Past uses of sites leaving problems such as contamination
which are expensive or risky to address for new users.
• Sites being poorly connected or badly located for alternative
uses.
• Difficulty financing risky sites where the level of remedial
works is uncertain. 
• Landowners retaining or purchasing land in the hope that
market values may increase.
• Buildings becoming unfit for use or uneconomic to maintain.
• Surplus land or buildings falling out of use but with no
incentives for owners to sell or redevelop sites.
• Lack of information on landowners who might be contacted
regarding the redevelopment or re-use of sites.
Relying on market conditions alone rarely results in more
problematic sites, particularly derelict ones, returning to viability.
These sites often require public support to return to positive uses. 
4 Research undertaken by the Taskforce is available at the Scottish Land Commission
website.  
.
Vacant sites are sometimes situated near people’s homes, leaving residents
uncertain about its future.
269

Page 270

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 8 of 33 DRAFT/ August 2023
Why vacant and derelict land should
be tackled 
Work by the Vacant and Derelict Land
Taskforce highlights the hidden costs of
urban dereliction, and how an ‘adverse
physical environment’ contributes to
Scotland’s problem of excess mortality.
Vacant and derelict sites affect people’s
feelings about the places in which they live
and visit.  Abandoned buildings and land,
especially in prominent locations such as
high streets, give rise to negative
perceptions for both residents and
visitors.  They often give rise to concern
about safety, and attract negative
behaviours such as vandalism, fly tipping
and antisocial behaviour. 
Some sites present significant physical
barriers, cutting off communities or
making it difficult to access parts of the
countryside or coastline. There is also
uncertainty attached to some derelict
sites, it being unknown to communities
who owns sites or what, if anything, is
planned for them.
Vacant and Derelict
sites in relation to the
Scottish Index of
Multiple Deprivation
(2020)
North Ayrshire Boundary
VDL Sites
2020 SMID
Most deprived 10%
2nd most deprived 10%
3rd most deprived 10%
4th most deprived 10%
5th most deprived 10%
5th least deprived 10%
4th least deprived 10%
3rd least deprived 10%
2nd least deprived 10%
Least deprived 10%
270

Page 271

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 9 DRAFT/ August 2023
Above:  The Ardeer Peninsula, once significantly
industrialised.
Below:  The former Ayrshire
Central Hospital Maternity Unit.
The 2020 Scottish Index of Multiple
Deprivation shows vacant and derelict
land sites in North Ayrshire are typically
clustered in and around areas of highest
deprivation, disproportionately affecting
those communities already facing
challenges of poor health, low income,
crime, lack of housing and poor access to
services.  Approximately 40% of the
population of North Ayrshire live within
500m of a vacant or derelict site.
The aspiration is for vacant and derelict
sites to be redeveloped to meet the needs
of communities, such as for housing,
employment, green spaces, community
spaces, renewable energy, and places for
nature.  
271

Page 272

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 10 DRAFT/ August 2023
Vacant and derelict land in North
Ayrshire
As of January 2023, North Ayrshire had
1,133 hectares of vacant or derelict land
across 190 sites.  Approximately 85% of
sites are located in ‘Three Towns’, Irvine
and Kilwinning.  There is a further
concentration of sites near Kilbirnie.  The
north and west of North Ayrshire is much
less affected by vacant and derelict land.
Approximately 95% of vacant and derelict
land in North Ayrshire has been classified
as vacant or derelict for 15 years or more.
Many sites are in private ownership, or
their ownership status is uncertain, while
a number of sites are owned by North
Ayrshire Council or other public bodies.    
The distribution and
ownership of VDL in
North Ayrshire
North Ayrshire Boundary
2022 VDL Sites by
Ownership
Other/ Unknown
NAC/ Part NAC
Private
272

Page 273

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 11 DRAFT/ August 2023
Over 70% of sites are in urban areas,
however this only comprises
approximately 40% of the land area of
vacant and derelict sites, with some of the
largest sites such as those at Ardeer,
located outside of settlements.  Urban
sites are concentrated mostly in the
‘Three Towns’ of Stevenston, Saltcoats
and Ardrossan and of Irvine, Kilwinning
and Kilbirnie.
VDL in relation to rural
and urban areas of
North Ayrshire
North Ayrshire Boundary
2022 VDL Sites 
Urban Areas
Rural Area
273

Page 274

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028   
Page 12 of 33 DRAFT/ August 2023
PROGRESS
In 2013, when the 2014 VDL Strategy was prepared, there were
1,333 hectares of vacant and derelict land spread over 255 sites,
compared to 190 sites across 1,133 hectares in 2023.  Many of the
proposed actions and themes identified in the 2014 Strategy have
been progressed, including the undertaking of major regeneration
projects to redevelop vacant and derelict sites in North Ayrshire’s
Strategic Growth Areas, described below. 
Lochshore, Kilbirnie
Lochshore is the site of the former Glengarnock Steelworks near
Kilbirnie and covers around 250 hectares, including Kilbirnie
Loch.
Formerly under the ownership of Scottish Enterprise, the land is
now owned by North Ayrshire Council. The site will benefit from
around £1.7m of funding from the Vacant and Derelict Land
Fund.
After much consultation with residents and work with a range of
partners, a new £4.2 million Visitor and Community Hub has
recently been completed.  
The project is a key Community Wealth Building initiative for
North Ayrshire, aiding the regeneration of the surrounding
communities of Kilbirnie, Beith and Dalry, and serving the entire
Garnock Valley community.  
Benefits will include the creation of local supply chain
opportunities, the creation of jobs directly for delivery of the
masterplan and indirectly through the increased attractiveness
of adjacent industrial sites, and skills development through
volunteering activities.  Increased local investment and visitor
spend will present opportunities for local enterprise.
A new active travel route connecting the site to Kilbirnie and the
NCN7 will be constructed. Further active travel routes, a play
area and a 5km leisure route incorporating play and
interpretation have been designed. 
The Garnock Visitor and Community Hub provides improved
facilities for the local rugby club in addition to space for sports
and other community groups. 
New Community Hub building at Lochshore.
274

Page 275

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 13 DRAFT/ August 2023
i3 Irvine
Investment at i3, Irvine, will result in the creation of a Digital
Processing Manufacturing Centre (DPMC) at i3, Irvine
Enterprise Area to provide a Centre of Excellence for digital
automation and approximately 8,830 sqm of flexible advanced
manufacturing space serving digital process industries. This will
build on current Life Science Clustering at the site, and will
facilitate R&D activity, start up, spin out, and growth of Life
Science businesses and other advanced manufacturing
opportunities.
New developments at the i3 Irvine Enterprise Area Advanced
Manufacturing Space in Irvine will create a National Digital
Processing Industry Hub and advanced manufacturing flexible
space, serving digital processing industries. 
The National Digital Processing Industry Hub will be developed
at i3 with links to the National Manufacturing Institute for
Scotland in partnership with Strathclyde University and industry.
The project also includes construction of flexible business space
capable of meeting the requirements of Chemical and Life
Sciences manufacturing, Digital Automation and other
advanced manufacturing opportunities. The combined offer at
i3, centred round the National Digital Processing Industry Hub,
will attract a range of supply chain and digital technology SMEs
and start-up and offer strategic capacity to secure major digital
process sector investment at i3. 
The Gateway building at i3, Irvine.
275

Page 276

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 14 DRAFT/ August 2023
Ardrossan Coastal Quarter
The Ardrossan Coastal Quarter is the site of a former oil refinery,
but which has lain vacant for 30 – 40 years.
Proposals for the site include a new campus for Ardrossan
Academy and Winton Primary School, consolidating the schools
as part of a Community Campus which will also include an Early
Years facility, and re-provide Auchenharvie Leisure Pool and
Ardrossan Public Library.
The proposals also include sports pitches for school and
community use, 130-150 houses both private and social, a
coastal path, an International Marine Science and Environment
(IMSE) facility, commercial, public spaces and tourism uses.
Quarry Road, Irvine
Quarry Road is a large regeneration masterplan in the heart of
Irvine, which promotes health and wellbeing. The former
brownfield site is next to the historic recreation park which was
once the home of the Caledonian greyhound race track and has
been revitalised with new football pitches and outdoor sport
facilities. The building provides high quality office
accommodation and is also a landmark - forming a gateway for
safe, landscaped routes for pedestrians and cyclists from the
town centre to the new leisure development and park. 
Quarry Road, Irvine.
276

Page 277

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 15 DRAFT/ August 2023
Annickbank Innovation Campus
Annickbank Innovation Campus is an important business
location within Irvine’s i3 Enterprise Area providing modern,
energy efficient office space targeted at SMEs and life science
related sectors.
The Council are currently progressing a third phase of energy
efficient office development at Annickbank on a site of c.0.13
hectares, classed as vacant and derelict land for over forty
years.
Recent property market advice has highlighted the lack of
modern business properties in North Ayrshire. The proposed
building will meet this demand through the provision of a new
Class 4/5/6 two-storey office pavilion with 350 sq. m. of flexible
modern business space capable of sub-division.
The building will be constructed to achieve the enhanced carbon
emissions rate set by Section 7: Sustainability of the Scottish
Building Standards and include low or zero carbon generating
technologies (LZCGT). The aspiration is to achieve Platinum
standard which relates to net zero carbon emissions. 
5 Vacant and derelict sites can be viewed at the Storymap website.
Other actions and initiatives include:
Repurposing Property Grant Fund
The Repurposing Property Grant Fund has been developed by
the Council to support landowners and community groups in
bringing smaller sites back to use.  Stage 1 of the fund allows
property owners or community groups to carry out feasibility
studies to identify potential options for the sites and their
viability.  Future stages of funding are proposed to support the
progressing of proposals for sites.
Residential Development
Significant volumes of housing have been delivered at
previously vacant and derelict sites such as Montgomerie Park,
Irvine Harbourside, West Byrehill in Kilwinning and Caley Court
in Stevenston.
Annual Site Review
The annual review of sites by NAC officers and the publishing
of an online Storymap showing available information on vacant
and derelict sites5.
The 2023-2028 Vacant and Derelict Land Strategy provides an
opportunity to develop new themes and actions considering
experience gained in managing vacant and derelict land, the
Council’s updated priorities, and emerging research and
guidance. 
277

Page 278

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 16 DRAFT/ August 2023
DEVELOPING THE 2023 – 2028 STRATEGY
The National Policy Context
Scottish Government Policy
NPF4
Scotland 2045: our Fourth National Planning Framework, NPF4,
was adopted and published on 13 February 2023. It sets out the
Scottish Ministers’ policies and proposals for the development and
use of land and plays a key role in supporting the delivery of
Scotland’s national outcomes and the United Nations Sustainable
Development Goals. NPF4 supports collaborative working to
improve people’s lives by planning and delivering sustainable,
liveable and productive places, recognising that better places will
be an important part of achieving net zero in a way which also
tackles longstanding challenges and inequalities. 
Past industrial restructuring has had significant impacts in some
places and communities, contributing to concentrations of
disadvantage, child poverty, poor health outcomes and derelict
land, including within North Ayrshire. NPF4’s national spatial
strategy looks to use land wisely, including through a renewed
focus on reusing vacant and derelict land to help limit the new land
that we build on and to regenerate buildings and sites, thereby
transforming places and improving the wellbeing of communities. 
NPF4 supports development proposals that will result in the
sustainable reuse of brownfield land including vacant and derelict
land and buildings, whether permanent or temporary. Furthermore,
given the need to conserve embodied energy, demolition of
existing buildings is to be regarded as the least preferred option.
This overall policy approach also seeks to recognise the
contribution of brownfield land to nature recovery and realise
opportunities for its use as productive greenspace, where
appropriate, for example through the Central Scotland Green
Network project, which is identified as a National Development. 
Since 1988, the Scottish Government has undertaken an annual
survey of vacant and derelict land. The main purpose of the data
collected from local authorities is to provide the evidence base for
monitoring the extent and state of urban vacant and derelict land,
the remediation of vacant and derelict land and progress in
bringing it into re-use, and to inform the programming of
rehabilitation, planning, and reuse of urban vacant and derelict site,
including in relation to the Vacant and Derelict Land Fund.
Scottish Biodiversity Strategy to 2045
The Scottish Biodiversity Strategy sets out the vision and ambition
for Scotland to be ‘nature positive’ by 2023, meaning levels of
biodiversity are increasing.  The strategy is one of several
elements in Scotland’s Biodiversity Delivery Framework, to include
a Natural Environment Bill, a delivery plan and investment plan. 
Local authorities will be subject to binding biodiversity targets, and
278

Page 279

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 17 DRAFT/ August 2023
the development of ‘Nature Networks’6 are a means by which
these targets will be met.  Vacant and derelict sites already
contribute to biodiversity and have the potential to be important
parts of future Nature Networks, helping achieve the ambitions of
the Biodiversity Strategy in North Ayrshire.
The Local Policy Context
The approach to vacant and derelict land is guided by the priorities
and strategies of North Ayrshire Council. Those of most relevance
to the future strategy for vacant and derelict sites are highlighted
below.
The North Ayrshire Council Plan 2019-2024 sets out the
Council’s strategic approach which is focused on making North
Ayrshire a fairer and more equal society. The Council Plan outlines
our Vision, Priorities and Key Measures to achieve a North
Ayrshire that is ‘Fair for All’.
North Ayrshire Council’s Community Wealth Building Strategy7
2020 – 2025 was the first of its kind in Scotland.
The mission of Community Wealth Building in North Ayrshire is to
support the achievement of the Council’s vision of a North Ayrshire
that is ‘Fair for All’ by: 
6 A collection of high-quality and well-connected areas that allow wildlife to thrive
and cope with climate change, as well as enhancing natural beauty and delivering
benefits for people such as flood alleviation (Natural England)
‘Enhancing local wealth and the creation of fair jobs,
maximising the potential of all our places through working in
partnership with our communities and businesses.’
Land and assets, including vacant and derelict land, are one of the
five ‘pillars’ of Community Wealth Building, to be used for the
common good to support the regeneration of North Ayrshire’s
communities.
The Council’s Adopted Local Development Plan (November
2019), commonly known as LDP2, sets out how the Council aims
to guide development and investment in the area over a 20-year
period. The vision of the LDP is shared with the Community
Planning Partnership’s North Ayrshire Partnership Plan (NAPP)
and the spatial strategy supports the delivery of the LIOP and North
Ayrshire becoming healthier, working, thriving and safer. This land-
use strategy directs most development to our towns, villages and
developed coastline where there is infrastructure capacity to
support it, where there is access to existing services and where
there are opportunities to re-use and redevelop brownfield land.
The Council has commenced work on preparing a new Local
Development Plan which will take account of NPF4.
The North Ayrshire Economic Recovery and Renewal
Approach (a local ‘Green New Deal’), responding to the Covid 19
health emergency, sets out how the objectives of Community
Wealth Building can be delivered through an inclusive and green
7 Information on Community Wealth Building is available on the Scottish
Government website.
279

Page 280

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 18 DRAFT/ August 2023
economic recovery, achieving net zero carbon ambitions in
response to the Climate Emergency, through the creation of
sustainable infrastructure and regeneration projects, and creating
fair jobs.
The Environmental Sustainability & Climate Change Strategy
2021-23 aims to inspire positive low carbon behaviour, raise
awareness of the sustainability and climate change agenda,
maximise access to affordable renewable energy technology,
support sustainable transport, utilise natural and built assets
sustainably, build new assets sustainably in accordance with the
Scottish Government’s investment hierarchy, deliver an inclusive
and green economy based on the principles of Community Wealth
Building and the local ‘Green New Deal’.
The North Ayrshire Regeneration Delivery Plan sets out the
Council’s priorities for delivering on regeneration ambitions of the
Council Plan and Community Wealth Building Strategy.  The Plan
focuses on the delivery of physical regeneration, informed by
stakeholder consultation, reviewing existing community priorities
and the outcomes of previous consultations.  It aims to address
local priorities, support changes within communities and to
contribute to a vibrant and inclusive economy.  The preparation
and implementation of the Vacant and Derelict Land Strategy is
and action of the Regional Delivery Plan.   
8 Further information is available on the Scottish Government Derelict Land
Investment Programme website. 
The Regeneration Delivery Plan informs the Council’s priorities for
securing and delivering against external funding sources including
Scottish and UK Government funds.  Some funding sources relate
directly to vacant and derelict land, including the Vacant and
Derelict Land Fund and the separate Vacant and Derelict Land
Investment Programme8.  However, other funding streams
applying to urban regeneration, economic development and
environmental schemes have, and will continue to, enable change
to vacant and derelict sites.
The Ayrshire Regional Economic Strategy (RES)9 sets out
Ayrshire wide themes and desired outcomes relating to work,
innovation, enterprise, health and wellbeing, communities, and
natural capital, with the overarching vision of ‘building wealth for
everyone in Ayrshire'.  The RES identifies vacant and derelict land
as one of Ayrshire’s most difficult challenges, and its repurposing
offers opportunities for meeting desired outcomes set out in the
RES. 
Other strategies of direct relevance to vacant and derelict land
include:
The Local Biodiversity Action Plan, where the naturalisation of
vacant and derelict sites can provide ecosystem services, spaces
for nature and quality green space.
North Ayrshire’s 2030 Woodland: A Tree Planting Strategy,
outlining the Council’s route map for planting 108,000 trees by
9 The Regional Economic Strategy is available on the North Ayrshire Council website. 
280

Page 281

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 19 DRAFT/ August 2023
2030 required to meet its net zero goal, highlighting the potential
for vacant and derelict sites to contribute to this target.
The Local Transport Strategy, with vacant or derelict sites
potentially providing opportunities for active travel and
encouraging more compact forms of development which are less
reliant on car ownership. 
The Local Housing Strategy and Strategic Housing
Investment Plan (SHIP), where the reuse of vacant and derelict
land can contribute to ensuring there is an adequate supply of land
to meet the housing needs of communities in North Ayrshire.
Food Growing Strategy, where vacant and derelict sites may
provide space for community food growing initiatives and
allotments, allowing communities to develop skills and adopt
healthy lifestyles.
In summary, the appropriate regeneration of North Ayrshire’s
vacant and derelict sites is a priority in its own right, but also
presents significant opportunities for addressing Council priorities
including:
• Town centre revitalisation and the creation of ‘20-minute
neighbourhoods’
• Meeting the climate emergency and challenge of net zero
• Economic regeneration and employment
• Meeting housing needs
• Strengthening communities
• Making space for nature  
Housing on a previously derelict site at North Newmoor,
Irvine 
281

Page 282

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 20 DRAFT/ August 2023
Listening to local communities and stakeholders
The 2023-2028 Vacant and Derelict Land Strategy has been
informed by engagement with stakeholders and communities of
North Ayrshire, through online consultation and a series of in
person events. Several common themes emerged from the range
of responses received.
• Many respondents expressed how they would like to see
vacant and derelict sites in community use, providing
green space, recreation facilities, community gardens,
allotments or used for renewable energy projects.
• Respondents expressed frustration that owners or
purchasers of vacant and derelict sites appeared to be ‘land
banking’ sites, with apparently no plans for immediate
development.
• There was frustration that landowners were able to allow
sites to remain or fall into disrepair, blighting the local
area and attracting anti-social behaviour.
• Respondents often referred to the blighting effects of
relatively small sites which have a disproportionate effect
on their towns and communities.  Some of these sites are
not currently included in the register of vacant and derelict
sites because of their size.
• People expressed concern about the loss of built heritage
through buildings falling into disrepair or their demolition
through redevelopment.
• Respondents commented on the blighting effect of coastal
sites, detracting from a key asset of the area, negatively
impacting residents and visitors alike. Some large coastal
sites in North Ayrshire impede access to the coast. 
282

Page 283

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 21 DRAFT/ August 2023
It was noted how some vacant and derelict sites are of
value to communities, as green space or for their wildlife/
biodiversity value. Residents would not want these sites
to be developed or made inaccessible. 
• Many respondents stated how they would like to see the
Council intervene more to address vacant and derelict
sites, for example through compulsory purchase or other
enforcement action.
Other issues identified by stakeholders include:
• It is often the case that the owners of vacant or derelict sites
are unknown, or are otherwise difficult to contact, or
unwilling to engage.
• The risks associated with some sites, in particular smaller
sites, may disincentivise small to medium sized developers
and house builders, but may not be of sufficient scale to
attract capital investment as part of a wider scale
regeneration.
• Some sites, for example former industrial sites, are not well
situated to fulfil present day social and economic needs, or
to contribute to approaches such as ‘20-minute
neighbourhoods’.
• The Council has limited resources to recover costs
associated with making safe or dealing with environmental
health matters. The possibility of cost recovery from
landowners by the Council may even be a disincentive to
sell a vacant or derelict site.
• Potential developers of vacant and derelict sites may be
uncertain as to the types of development which may be
possible or permissible and are therefore unwilling to risk
the cost of planning applications and associated studies.
• Heritage designations, in particular Listed Building status,
can add further complication and cost to the potential
developers of derelict buildings.
• Enforcement action or acquisition of sites by the Council
is restricted and needs specific requirements to be met. 
283

Page 284

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 22 DRAFT/ August 2023
Learning From Others
Scottish Land Commission Vacant and Derelict Land Taskforce
In 2018, the Scottish Land Commission and the Scottish
Environment Protection Agency (SEPA) established a national
Taskforce, comprising business, public and third sector bodies, to:
‘Transform Scotland’s approach to tackling vacant and derelict
land, create the conditions necessary for eradicating persistent
dereliction in urban communities and realise the social, economic
and environmental benefits of returning unloved derelict urban land
back to productive use.’
The Taskforce undertook extensive research into the problems of
VDL and has published research into the effect of VDL on
communities, the opportunities it provides and case studies into
bringing VDL sites back into use. Key issues identified include:
• The problem of long-term derelict sites (DUSTEs), with sites
brought back into use tending to be smaller and more
recently vacated.
• The blighting effect of long-term derelict sites on
communities, negatively affecting the local environment,
economy and social cohesion.
• How prominent sites tend to be the most harmful to
communities, with effects exacerbated by the clustering of
sites.
• The need to enable communities to take a lead role in
identifying and prioritising locally significant sites for action.
• The need to focus efforts where urban dereliction is most
heavily concentrated.
The outcome of the study is a series of recommendations, sitting
within four main themes.
• Making better use of data
• Aligning policy to support delivery
• Aligning strategic funding to support delivery
• Stemming the flow of new sites
The full recommendations of the Vacant and Derelict Land Task
Force are available at www.landcommision.gov.scot.
284

Page 285

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 23 DRAFT/ August 2023
Architecture and Design Scotland Stalled Spaces Programme
In 2014, Architecture and Design Scotland developed the Stalled
Spaces initiative to enable communities to transform disused
spaces and communicate their aspirations to Local Authorities in
their development, while also developing skills and knowledge
within communities. While the Stalled Spaces initiative is no longer
active, resources and guidance are available10, including the
Stalled Spaces Toolkit.
The toolkit provides a ‘how to’ guide, providing advice on topics
such as forming a constituted group, budgeting, landowner
agreements, planning permission, project development and
promotion.
Centre for Local Economic Strategies (CLES)
The CLES was tasked by the Scottish Government to undertake a
review of the longstanding problem of vacant and derelict land in
the Glasgow City Region. The recommendations of this review,
published in 2021, advocate the repurposing of VDL along the lines
of Community Wealth Building, including:
• Taking a holistic approach to land, which is a shared
resource, to which the Scottish Land Rights and
Responsibilities Statement11  should apply.
• Broader, long term land stewardship, rather than ownership,
should be considered.
• The need for work between agencies to catalyse action. 
10 Stalled Spaces Scotland | A&DS (ads.org.uk)
11 Scottish Land Rights and Responsibilities Statement (www.gov.scot)
• Simplifying funding streams.
• Tackling sites in areas of greatest deprivation first.
• Making all safe sites accessible.
• Learning from local exemplars.
• Prioritising carbon capture through peatlands, tree planting
and rewilding.
• Stemming the flow of new VDL.
The full recommendations of the CLES report are available on their
website12. 
12 CLES Report on VDL for the GCR (inclusivegrowth.scot)
285

Page 286

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 24 DRAFT/ August 2023
ACTION PLAN
Principles 
The aim of the strategy is to reduce the amount of vacant and
derelict land in North Ayrshire, and the following principles can
guide how this change is brought about.
While Scottish Government policy prefers to re-use vacant and
derelict sites, it should be recognised that some sites, particularly
those which are isolated from communities or in more rural
locations, may not ever be suitable for development, but could
contribute to green networks, places for nature or open space,
helping to meet carbon net-zero or biodiversity targets.  In
response to Scotland’s Biodiversity Strategy, the repurposing of
sites to create Nature Networks may be the best outcome.
The redevelopment of vacant and derelict land should support the
creation of sustainable places, for example through the ‘20-
minute neighbourhood’ concept.
Communities are subject to the adverse effects of vacant and
derelict sites.  Communities should be supported to improve
sites which affect them most, this may be through temporary or
permanent uses.
Sites should be evaluated to establish which are local priorities
to communities, their development potential and barriers to
development.
Innovative approaches should be supported to help remove
barriers to the redevelopment or reuse of sites, helping to de-risk
sites.
Opportunities to gather information on sites, monitor them and
share information should be maximised.
Where necessary, the Council will continue to utilise appropriate
powers where other actions fail.
Themes and Actions 
Actions for reducing the amount of vacant and derelict land in North
Ayrshire are identified under the following themes.
Theme 1: Leading by Example
Responsible stewardship of sites in Council ownership.
Theme 2: Identifying Priorities.  
Identifying which sites can contribute most to National and Local
priorities.
Theme 3: Working with Others.  
Supporting other owners of VDL sites in putting them to positive
use.
Theme 4: Supporting Communities.  
Providing support to communities to improve sites which affect
them most, this may be through temporary or permanent uses.
Theme 5: Information Gathering, Monitoring and Reporting.  
Collecting and sharing information about vacant and derelict land. 
286

Page 287

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 25 DRAFT/ August 2023
Theme 1: Leading by Example
Whilst there are several reasons for a lack of redevelopment of
sites, including economic, locational, or physical constraints, or a
lack of financial viability, site ownership can be a barrier to the
delivery of the 2023-2028 Vacant and Derelict Land Strategy.
Therefore, to evidence the potential of vacant and derelict land, the
Council will aim to utilise the sites within its ownership as best
practice examples for the transformation of Vacant and Derelict
Land. 
1. The Council will continue to promote existing large-scale
priorities and development of proposals for Council
owned VDL sites. 
2. Detailed assessment of remaining Council sites will be
undertaken to identify the potential of sites, constraints,
and opportunities.  Remediation and management plans
will be developed for Council sites, including an
anticipated timeline for repurposing. 
3. The Council recognises the contribution of its vacant
and derelict sites to biodiversity and will fully enhance
and develop their potential for biodiversity, Nature
Networks and green space. 
The pilot house at Irvine, within the proposed ‘Maritime Mile’
waterfront regeneration led by North Ayrshire Council. 
287

Page 288

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 26 DRAFT/ August 2023
Theme 2: Identifying Priorities
The development of a means by which sites can be prioritised for
action based on a range of appropriate criteria would help to:
• direct resources to those sites with the greatest need for
development and 
• allow communities to better understand Council priorities for
action.  
Timelines and action plans should be developed according to site
prioritisation.  Priorities for action will ultimately be informed by an
evidence-based judgement informed by a range of criteria,
however the reasons for site prioritisation should be defined.
4. The preferred or likely end use of VDL sites should be
established based on the Local Development Plan (LDP),
feasibility studies, or statutory approvals.  Sites more
suitable for naturalisation, contributing to Nature
Networks and open space provision should also be
identified. 
5. The development of assessment criteria will provide a
transparent means of prioritising action and resource for
vacant and derelict land. Priorities will be based on a
range of criteria, however the reasons for site
prioritisation should be clearly defined. 
Assessment Criteria Description
Prominence Sites in town centres, high streets and urban
coastlines should be of higher priority for action. 
Sites which are more remote or naturalised may be
of lower priority.
Length of time vacant Sites which have been vacant for 15+ years should
be prioritised.
Scottish Index of
Multiple Deprivation
(SIMD)
The location of the site in relation to deprived
communities.  Sites situated closer to more deprived
communities should be of higher priority.
Built heritage Sites with locally iconic or architecturally prominent
buildings.
Site condition Sites in the poorest condition should be of higher
priority.
Leverage of Funding Sites where funding can be secured through funding
streams identified in the Regeneration Delivery Plan
should be prioritised.
Proposed end use If known, sites which can best contribute to meeting
local priorities and known needs should be
prioritised for action.
Community feedback Sites which have been specifically identified by
communities as an area of concern should be
prioritised. 
288

Page 289

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 27 DRAFT/ August 2023
Theme 3:  Working with Others
Addressing vacant and derelict land will require collaboration
between various parties including landowners and partners in the
public and private sectors.  Potential site developers would benefit
from the de-risking of sites, and greater certainty as to end uses
which could receive support from the Council.  
6. The Council will continue to develop and implement the
Repurposing Property Grant Fund and investigate
extending its scope to overcome barriers to bringing
sites back to positive uses, subject to available funding. 
7. The Council will gather information on land ownership,
and proactively engage with landowners to encourage
the appropriate management or restoration of sites to
positive uses, either permanently or on a temporary
basis, and identify the barriers to development. 
8. The Council will work with partners in the public sector,
for example through the Ayrshire Community Wealth
Building Commission, to identify their intentions for the
development or re-use of vacant and derelict sites in
their control. 
9. The Council will prepare masterplans and development
briefs for priority sites, subject to funding and where
appropriate consider the implementation of Masterplan
Consent Areas to simplify the planning processes for
appropriate forms of development. 
The site of the former Ayrshire Central Hospital Maternity Unit.
289

Page 290

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 28 DRAFT/ August 2023
Theme 4:  Supporting Communities
Communities should be supported to use a vacant or derelict site
on a temporary or permanent basis.
10. Subject to the availability of funding, the Council will
develop a stalled spaces programme to promote the
positive temporary use of vacant and derelict sites and
will work with landowners to facilitate access to sites
which are safe to contribute to open space provision. 
11. The Council will investigate the potential for a visual
improvement fund targeted at sites which are in very
poor condition, most affecting communities and in
prominent locations. 
12. The Council will implement a mechanism by which
communities can easily highlight sites of concern, put
forward suggestions for the use of vacant and derelict
sites and comment on development briefs prepared by
the Council. 
13. The Council will provide support to communities who
identify opportunities for the purchase of abandoned
land under Part 3A of the Land Reform (Scotland) Act
2003. 
290

Page 291

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 29 DRAFT/ August 2023
Theme 5:  Information Gathering, Monitoring and
Reporting
The best use should be made of available information, including
the sharing of information ensuring relevant and accessible
information is available.
14. The Council will continue to implement a programme of
site visits to monitor and record the status of all sites on
the VDL register, and those known to the Council with
areas <0.1ha which are of concern to communities. 
15. The Council will maintain digital mapping for vacant and
derelict sites and consider how additional information
may be included, for example, the planning status of the
site. 
16. The Council will publish and publicise an annual
summary of the status of vacant and derelict land
including sites added to or removed from the register.   
291

Page 292

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 30 DRAFT/ August 2023
NEXT STEPS
Delivery of the Action Plan & Progress Monitoring
Collaboration
Delivery of the Action Plan will require partnership between
communities and public sector bodies, with the Council playing a
key leadership role.  Plans for the delivery of actions identified in
this strategy will be developed, and progress will be monitored on
a regular basis.
Funding
The North Ayrshire Regeneration Delivery Plan (RDP) sets out the
Council’s priorities for delivering on regeneration ambitions of the
Council Plan and Community Wealth Building Strategy.  The Plan
focuses on the delivery of physical regeneration, informed by
stakeholder consultation, reviewing existing community priorities
and the outcomes of previous consultations, it aims to address
local priorities, support changes within communities and to
contribute to a vibrant and inclusive economy.  The RDP informs
the Council’s priorities for securing and delivering against external
funding sources including Scottish and UK Government funds.  
Some funding sources relate directly to vacant and derelict land,
including the Vacant and Derelict Land Fund and the separate
Vacant and Derelict Land Investment Programme. However, other
funding streams applying to urban regeneration, economic
development and environmental schemes have, and will continue
to, enable change to vacant and derelict sites. 
I3, Irvine
292

Page 293

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 31 DRAFT/ August 2023
The Council will continue to investigate and pursue funding
opportunities to support the delivery of this strategy through the
RDP process. 
Future Strategy Review
The repurposing of existing vacant and derelict sites will in many
cases be a long-term process, potentially many years.  As existing
sites leave the VDL register, it is likely that others will join, and the
composition and characteristics of VDL will change over time.  
With improved environmental protections, and a less industrialised
economy, it can be expected that in the future there will be fewer
sites with the legacy of contamination seen at old former industrial
sites.  Vacant and derelict sites may, on average, become smaller
and increasingly in private hands.  This more dispersed pattern of
smaller sites will present different challenges to those which are
larger, more consolidated and in public ownership.
The Vacant and Derelict Land Strategy should therefore be
reviewed and refreshed after a period of 5 years to reflect the
changing priorities of the Council, new legislation, and the
changing composition of the stock of vacant and derelict land. 
293

Page 294

North Ayrshire Vacant and Derelict Land Strategy 2023 – 2028 
Page 32 DRAFT/ August 2023
REFERENCES
SCOTTISH GOVERNMENT
Scottish Planning Policy  Scottish Planning Policy (SPP) website
National Planning Framework (NPF3) NPF3 website
Draft National Planning Framework (NPF4) NPF4 website
Scottish Government Infrastructure Investment Plan website 
Scottish Government Community Wealth Building website 
Scottish Vacant and Derelict Land Survey – Site Register 
Scottish Government Vacant and Derelict Land Scottish
Government Guidance Notes website
The Scottish Government Vacant and Derelict Land Investment
Programme website
Scottish Government Community Right to Buy Abandoned,
Neglected or Detrimental Land website
Community Ownership Support Service Development Trusts
Association Scotland website
Scottish Government Building a Wellbeing Economy website 
Scottish Index of Multiple Deprivation (SMID) 2020 website 
Scottish Government Scottish Land Rights and Responsibilities
Statement website
Scottish Government Scottish Biodiversity Strategy to 2045
LOCAL PLANNING POLICY AND STRATEGY
North Ayrshire 2019 Local Development Plan 
North Ayrshire Community Wealth Building 
North Ayrshire Regeneration Delivery Plan 
North Ayrshire Regional Economic Strategy
2014 North Ayrshire Vacant and Derelict Land Strategy 
North Ayrshire 20 Minute Neighbourhoods
North Ayrshire Plans Strategies and Policies website
SCOTTISH LAND COMMISSION
Scottish Land Commission Vacant and Derelict Land Taskforce 
OTHER NON-GOVERNMENTAL BODIES
Centre for Local Economic Strategies (CLES) website 
CLES report on Vacant and Derelict Land in the Glasgow City
Region (CLES, 2021) 
Architecture and Design Scotland – Stalled Spaces Toolkit  
Central Scotland Green Network website
OTHER LOCAL AUTHORITIES
Renfrewshire Council’s Vacant and Derelict Land Strategy 2020 
294

Page 295

NORTH AYRSHIRE COUNCIL 
26 September 2023 
Cabinet
Title: Local Transport and Active Travel Strategy 2023-2028
Purpose: To seek approval for the Local Transport and Active Travel
Strategy 2023-2028
Recommendation: That Cabinet approves the proposed Local Transport and Active
Travel Strategy 2023-2028, provided at Appendix One. 
1. Executive Summary 
1.1 Transport has the potential to affect everyone in North Ayrshire, for example, through
access to employment, education, healthcare, social and leisure activities. It is
identified as a priority within the Council Plan, the North Ayrshire Partnership Plan and
Locality Priorities. An effective transport network facilitates and supports regeneration
of our towns and villages, the delivery of a wellbeing economy alongside contributing to
addressing climate change and reducing inequalities. 
1.2 The proposed Local Transport and Active Travel Strategy 2023-2028 (LTATS), for
which this report seeks approval, examines how Active Travel and Transport fits within,
and supports the wider context of national and local priorities and objectives. It provides
a vision that North Ayrshire will have a sustainable and well-connected transport
network that meets the needs of all, supports an inclusive economy, healthier
communities and creates an attractive place in which to live, work, visit and do
business. The LTATS proposes the following three strategic priorities of: Accessibility
for All; Inclusive Economic Growth; and Healthier Communities. 
1.3 The LTATS provides a framework for investment and decision-making in transport up to
2028. It outlines the priorities for improving transport in North Ayrshire which can
support investment in areas which have the potential to offer benefits to residents,
businesses and visitors. 
2. Background 
2.1 The Council Plan sets out the Council’s ambitions for North Ayrshire. This includes
active, inclusive and resilient communities, the transition to a wellbeing economy
delivering prosperity, wellbeing and resilience for local people alongside contributing to
tackling climate change. The provision of a connected and effective transport network is
key to delivering on these ambitions. High-quality opportunities for active travel and
public transport for everyday journeys are vital to improving the local economy,
improving the environment, increasing social inclusion, and delivering health benefits
for all residents and visitors of North Ayrshire. 
2.2 Local Transport Strategies (LTS) set out the local vision, objectives and proposals for
transportation alongside a framework for investment and decision making. The current
Agenda Item 8
295

Page 296

North Ayrshire LTS was published in 2015 and was due for review in 2020. This work
was delayed due to the pandemic and the subsequent delay in national and regional
transport policy development, which the LTATS should reflect. 
2.3 Through the previous strategy, the Council has been able to secure funding and deliver
a significant number of improvements to roads, public transport and active travel routes
alongside behaviour change initiatives. These improvements included Tarryholme to i3
Enterprise Area Active Travel Link, Trinity Active Travel Hub, Brodick Ferry Terminal,
Bus Route Congestion Reduction Measures, Timber Transport Improvements and
securing funding for the B714 Upgrade. 
2.4 Since the strategy’s adoption, the economic climate, strategic transport policy and
climate change ambitions have changed considerably. Furthermore, recognising the
focus given to active travel nationally and its role in addressing climate change there is
a need to consider walking, wheeling and cycling in more detail and the integration of
transport to make travel by several modes easier for all. 
2.5 The development of a new strategy looking forward from 2023 to 2028 provides an
opportunity to take transport services and provision in North Ayrshire in a direction
which can help address some of the economic and climate change challenges and
opportunities now faced. 
2.6 The strategy has been informed and influenced by: 
• a review of national, regional and local strategies and plans;
• identifying local issues and opportunities at an early stage;
• a comprehensive review of the transport and active travel network;
• a review of travel patterns;
• an extensive initial consultation exercise between February and April 2022 including
online consultation, public events and street surveys;
• stakeholder engagement, including Elected Member briefing sessions;
• a dedicated website to enable feedback; and
• a consultation on the draft strategy between February and April 2023 including
online consultation and public events. 
2.7 A dedicated LTATS website was launched in February 2023 to enable public
consultation on the draft strategy. The consultation process involved an online
questionnaire and in-person events in Kilwinning, Largs, Kilbirnie, Irvine, Millport,
Saltcoats and Brodick. This was publicised via e-mail to all previous
consultees/stakeholders, the Council website, press releases and the Council’s social
media channels. A total of 106 responses were received. Within these, detailed
responses were received from several stakeholder organisations, which have informed
the proposed strategy. The proposed strategy was also considered by the Policy
Advisory Panel in August 2023. 
2.8 The Strategy’s Delivery Plan sets out the actions needed to deliver on the vision and
strategic priorities. It is recognised that some of these are not the sole responsibility of
North Ayrshire Council, for example, in relation to the provision of public transport and
ferries. Feedback from both stakeholders and the public however has highlighted the
importance of the Council’s role in pursuing improvements to these transport services
and continuing to work in partnership with operators and other appropriate
organisations. 
2.9 The delivery plan actions include indicative timescales (short, medium and long) within
the tables. These will be progressed throughout the lifetime of the LTATS and will be
296

Page 297

used as the basis for seeking and prioritising funding opportunities. An annual
assessment will be carried out to review progress on these actions. Actions include: 
• Undertaking feasibility studies and technical design to develop strategic active
travel corridors across the six localities.
• Supporting the delivery of the community transport pilot project.
• Identifying and implementing travel demand management measures to achieve the
national 20% car km reduction route map.
• Working with partners to deliver the Island Connectivity Study.
• Working with partners to apply and embed Community Wealth Building principles
within transport activities and projects. 
2.10 If approved, the strategy will inform the expenditure of future allocations under the
Scottish Government’s Cycling Walking and Safer Routes funding and funding
applications for example to Strathclyde Partnership for Transport’s Capital Programme. 
3. Proposals 
3.1 That Cabinet approves the proposed Local Transport and Active Travel Strategy 2023-
2028, provided at Appendix One. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Priorities emerging from the LTATS will require funding through the Council Capital
programme and/or external sources of funding. The Local Transport and Active Travel
Strategy 2023-2028 will inform our priorities for securing and delivering against external
funding sources. 
4.2 The Regeneration team has extensive experience of and success in securing external
funding for project development and delivery. The implementation of the Delivery Plan
will be dependent on continuing Scottish Government allocations under Cycling
Walking and Safer Routes and the success of any funding applications. 
Human Resources 
4.3 The Delivery Plan will be delivered through the existing Active Travel and Transport
Team resource. Opportunities to secure funding for additional staff resource to support
delivery will be considered on a project-by-project basis as required. 
Legal 
4.4 None 
Equality/Socio-economic 
4.5 An Equality Impact Assessment (EqIA) has been carried out for this strategy as the
needs of all transport modes and users have been considered when developing the
actions. The proposed LTATS has no negative impacts and provides a positive impact
on the protected characteristics of disability, age, gender and pregnancy and maternity.
The need for additional Equality Impact Assessments will be considered through the
implementation of the strategy on a project-by-project basis.
297

Page 298

Climate Change and Carbon 
4.6 The transport priorities being promoted through the LTATS aim to support sustainable
and active travel and reduce the impact of transport on our communities. These aim to
reduce the volume of traffic travelling through our towns and to facilitate public transport
to support a shift towards more sustainable travel behaviours. This accords with and
will contribute to the delivery of the Environmental Climate Change and Sustainability
Strategy. 
4.7 To comply with the Environmental Assessment (Scotland) Act 2005 and as required by
EU Directive 2001/42/EC, the proposed strategy has been subject to a Strategic
Environmental Assessment. (SEA). The interim SEA Environmental Report, available at
https://northayrshiretransportstrategy.com/files/SEA.pdf, communicates the anticipated
environmental effects of the strategy and sets out proposals for the monitoring of such
environmental effects. Mitigation measures have been developed to avoid, reduce, or
offset adverse environmental effects of the strategy. 
Key Priorities 
4.8 The LTATS has been informed by the priorities identified within the Local Outcomes
Improvements Plan and Locality Partnership priorities. The implementation of the Plan
will contribute to achieving the four Council Plan priorities and key activities of:
Ensuring our places and spaces where we live, work and visit are well maintained and
accessible; Developing infrastructure to support business growth; Working with
communities to adopt low carbon behaviour change; Developing and promoting active
travel infrastructure; Transitioning to low and zero carbon travel; and Focusing our
investment on priorities. 
Community Wealth Building 
4.9 The Inclusive Growth Diagnostic identified transport as a barrier to inclusive growth at a
local level. The provision of a connected transport network including high-quality
opportunities for active travel and public transport for everyday journeys is vital to local
communities and delivering a wellbeing economy and Community Wealth Building. 
4.10 Its delivery will make a significant positive contribution to the Council’s ambitions across
the pillar of Land and Assets by maximising land through alternative uses for
community benefit by the creation of active travel networks. The Economic Policy team
has reviewed the proposed LTATS to ensure alignment with Community Wealth
Building principles. 
5. Consultation 
5.1 The development of the LTATS included extensive internal and external consultation at
the initial development and draft strategy stages. These consultation exercises included
Elected Member workshops, online and hard copy surveys, public drop-in events, on-
street surveys, a dedicated website, accessibility workshops and stakeholder
workshops. The proposed strategy was also considered by the Policy Advisory Panel in
August 2023. 
RUSSELL McCUTCHEON
Executive Director (Place)
For further information please contact Claire Fitzsimmons, Interim Senior Manager –
298

Page 299

North Ayrshire Council Local Transport and Active Travel Strategy 
Background Papers
North Ayrshire Local Transport Strategy, 2015
299

Page 300

Local Transport and Active Travel Strategy 
North Ayrshire Council
Local Transport and Active Travel Strategy 
DRAFT
SEPTEMBER 2023
300

Page 301

301

Page 302

North Ayrshire Council Local Transport and Active Travel Strategy 
3
Contents
1 Introduction ....................................................................................................................... 4
2 Policy and Strategy Context ........................................................................................... 10
3 Background Information ................................................................................................. 17
4 Consultation and Vision, Strategic Priorities and Objectives ..................................... 21
5 Active Travel Strategy .................................................................................................... 27
6 Public Transport .............................................................................................................. 51
7 Road Network .................................................................................................................. 61
8 Carbon Reduction ........................................................................................................... 69
9 Delivery Plan .................................................................................................................... 75
10 Monitoring and Evaluation ............................................................................................. 88 
Disclaimer
All figures making use of Ordnance Survey mapping have been created under Crown copyright and database rights 2022 OS 100023393
302

Page 303

North Ayrshire Council Local Transport and Active Travel Strategy 
4
1 Introduction
What is a Local Transport and Active
Travel Strategy?
The North Ayrshire Council (NAC) Local Transport and Active
Travel Strategy (LTATS) sets out how we intend to contribute
to national transportation objectives and specifies actions
which will achieve objectives that are distinctive to North
Ayrshire.
The North Ayrshire Council LTATS includes a detailed vision
for improving transport and travel in North Ayrshire. It also
outlines our strategic priorities and objectives and explains
how we will achieve this in a Delivery Plan. 
This Strategy replaces the Local Transport Strategy 2015-20,
which included supporting economic growth and seeking to
ensure communities were connected. Whilst both an inclusive
economy and connected communities are still relevant, the
development of a new strategy also provides us with an
opportunity to move towards a low carbon, less polluting
transport network. 
Recognising the focus given to active travel nationally, this
new strategy highlights the importance of active travel with a
specific chapter for the Active Travel Strategy.
This strategy has been developed through evidence
gathering, consideration of the wider policy and strategy
context, consultation with stakeholders and feedback from the
members of the public. 
Why Do We Need a Local Transport and
Active Travel Strategy?
Enhancing the transport network is a key driver for: improving
the local economy, improving the environment, increasing
social inclusion, and delivering health benefits for all residents
and visitors of North Ayrshire.
Transport has the potential to affect everyone in North
Ayrshire, for example, to access employment, education,
healthcare, social and leisure activities. An effective transport
system facilitates and supports the development of a
sustainable and inclusive economy, and regeneration in North
Ayrshire. It contributes to addressing climate change and
reducing inequalities. 
This LTATS provides a framework for investment and
decision-making in transport up to 2028. It outlines the
priorities for improving transport in North Ayrshire which can
support investment in areas which have the potential to offer
benefits to residents and businesses.
It is recognised that, while the Delivery Plan is not currently
fully funded, it provides the basis to seek funding
opportunities through partners for the projects that have been
identified. 
303

Page 304

North Ayrshire Council Local Transport and Active Travel Strategy 
5
Delivering the Strategy
North Ayrshire Council alone are unable to progress all the
actions and instead we wish to work in partnership with other
organisations and operators who are responsible for transport
services. North Ayrshire Council already works with many
organisations to deliver and improve transport services in
North Ayrshire. The roles and responsibilities of the principal
organisations responsible for transport infrastructure and
services in North Ayrshire are provided in subsequent pages. 
The Delivery Plan is at the heart of the strategy and sets out
actions to help work towards a transport system that meets
the needs of North Ayrshire. While some of the actions
included in the Delivery Plan are not the responsibility of NAC
e.g., the provision of public transport and ferries, feedback
from stakeholders and members of the public has identified
that they would like improvements to these transport modes.
Therefore, the LTATS aims to address this feedback by
influencing and collaborating with partners.
COVID-19
It is acknowledged that transport provision and travel patterns
have changed due to the COVID-19 pandemic. The pandemic
has created uncertainties in transport needs with fewer
people travelling initially due to Government restrictions in
movement and the ongoing reduced availability of transport
services. More people are working from home and fewer
people are commuting and travelling at the traditional peak
times (in the morning and early evening).
People were discouraged from using public transport to
reduce the spread of the virus and public transport services
were reduced. While public transport service provision has
started to increase in some areas, other services have been
removed or continue to be reduced in parts of North Ayrshire.
This has presented challenges for people in accessing
services and maintaining access to social activities to support
their wellbeing. 
While there remain uncertainties about travel patterns in the
future, it is important that action is taken to minimise any
increase in car use due to reduced availability of transport
services to support the Council’s ambitions.
LTATS Process and Timeline
The strategy has been influenced by local, regional, and
national strategy, views, and opinions. It has been produced
following a comprehensive process where local issues and
opportunities were identified at an early stage to inform a
detailed action plan to be put in place that will aim to provide
positive solutions for all. 
The strategy has been informed by: 
• A comprehensive review of the transport and active travel
network
• A review of travel patterns
304

Page 305

North Ayrshire Council Local Transport and Active Travel Strategy 
6
• An extensive consultation exercise between February and
April 2022. 
• Stakeholder Workshops
• A dedicated website for providing comments.
• A further consultation on the draft strategy between 24
February and 23 April 2023
The development of the LTATS has followed the principles
and initial key stages of the Scottish Transport Appraisal
Guidance (STAG). STAG provides a framework to assess
evidence-based transport problems and opportunities. 
This process, and the key stages of STAG that have been
followed, are set out in the LTATS Process diagram below.
305

Page 306

North Ayrshire Council Local Transport and Active Travel Strategy 
7
306

Page 307

North Ayrshire Council Local Transport and Active Travel Strategy 
8
Roles and Responsibilities
The LTATS recognises that the Council is unable to progress all of the required actions in isolation. The Council is committed to
working in partnership with other organisations and operators who are responsible for delivering transport infrastructure and
services. The roles and responsibilities of the principal organisations responsible for transport infrastructure and services in
North Ayrshire are shown in Table 1-1. This is a summary of the main organisations however the Council works with many
more to deliver and improve transport services in North Ayrshire.
While some of the actions included in the Delivery Plan are not the direct responsibility of NAC, e.g. the provision of public
transport and ferries, feedback from stakeholders and the public has identified the importance of improvements to these
transport modes. The LTATS therefore aims to address this by committing to influencing and collaborating with the responsible
partner organisations.
Table 1-1  Selected Transport Roles and Responsibilities
Organisation Roles / Responsibilities
North Ayrshire Council • Local Transport & Active Travel Strategy
• Maintenance of local roads and active travel routes
• Design and implementation of new active travel routes, local roads and
bridges
• Street lighting
• Local road safety
• Parking management
• Travel behaviour change projects
Scottish Government / Transport
Scotland
• Rail projects
• Management of ScotRail services
• National Transport Strategy
• Trunk road network
• Major trunk road and bridge projects
• National Concessionary Scheme
307

Page 308

North Ayrshire Council Local Transport and Active Travel Strategy 
9
• Aviation, freight, bus and taxi policy
• Ferries, ports and harbours
• Blue badge scheme
SPT • Regional Transport Strategy
• Monitor commercial bus services
• Procure subsidised bus services
• Operate MyBus demand responsive bus services
• Manage bus stops and shelters
• Administer the Zonecard ticket
• Manage Strathclyde concessionary travel scheme
CalMac • Management and operation of ferry services in North Ayrshire 
CMAL • Owns the ferries, ports and harbours for services operated by CalMac 
Bus Operators • Delivery of commercial and subsidised bus services 
Network Rail • Own and manage rail infrastructure
ScotRail • Management and operation of rail services 
308

Page 309

North Ayrshire Council Local Transport and Active Travel Strategy 
10
2 Policy and Strategy Context
The LTATS has been developed to align with and support key
national, regional and local policies and strategies. While this
policy and strategy summary is not exhaustive, it illustrates
the key influences on transport in North Ayrshire. 
1 National Transport Strategy
2 STPR2 Website
National
Scotland’s National Transport Strategy 2 (NTS2), 20201
sets out an ambitious vision for the transport system and
outlines four priorities: reducing inequalities, taking climate
action, helping to deliver inclusive economic growth, and
improving health and wellbeing. 
The Sustainable Travel Hierarchy is embedded in NTS2 and
in decision-making by promoting walking, wheeling, cycling,
public transport and shared transport options in preference to
single occupancy private car use for the movement of people.
Efficient and sustainable freight transport is also promoted for
the movement of goods. This LTATS adopts the sustainable
travel hierarchy in line with national transport policy.
The Strategic Transport Projects Review 2 (STPR2)2 is a
Scotland-wide review of the strategic transport network
across all transport modes, as well as reviewing wider island
and rural connectivity, which includes ferries and air travel.
STPR2 makes 45 draft recommendations that focus
investment on sustainable transport options. Many of these
will benefit communities and businesses across Scotland and
some will have particular benefit to the Ayrshire and Arran
area. The Update to the Climate Change Plan3 sets out the
Scottish Government’s approach to delivering a green
recovery, with a focus on the period up to 2032. The transport
3 Update to the Climate Change Plan
309

Page 310

North Ayrshire Council Local Transport and Active Travel Strategy 
11
related components of the plan build upon NTS2, with a
specific commitment to reduce car kilometres by 20% by
2030.
Subsequently, an evidence report, and a national discussion
on a route map has also been published. The route map
acknowledges that the percentage reduction target is for an
overall national reduction, and it does not expect car use in
rural and island community areas to necessarily reduce at the
same rate as in towns and cities.
The Scottish Government have adopted a new spatial
strategy for Scotland that looks ahead to 2045.  National
Planning Framework (NPF4)4 sets out Scottish Ministers’
policies and proposals for the development and use of land
and plays a key role in supporting the delivery of Scotland’s
national outcomes and the United Nations Sustainable
Development Goals. In recognising that better places will be
an important part of achieving net zero in a way which also
tackles longstanding challenges and inequalities, NPF4
supports collaborative working to improve people’s lives by
supporting the planning and delivery of: 
• Sustainable places, where emissions are reduced and
biodiversity is restored and better connected
• Liveable places, where we can live better, healthier
lives; and 
4 National Planning Framework 4
• Productive places with a greener, fairer and more
inclusive wellbeing economy.
Local liveability, including through 20-minute neighbourhoods,
and improving community health and wellbeing by ensuring
people can easily access services, greenspace, leaning, work
and leisure locally is an overarching spatial principle
underpinning how future places are to be planned in
accordance with NPF4. 
NPF4 policy seeks to encourage, promote and facilitate
developments that prioritise walking, wheeling, cycling and
public transport for everyday travel and reduce the need to
travel unsustainably through investment in transport
infrastructure that supports connectivity and reflects place-
based approaches and local living; more, better, safer and
more inclusive active and sustainable travel opportunities and
developments in locations which support sustainable travel.  
Scotland’s National Strategy for Economic
Transformation5 sets out the priorities for Scotland’s
economy as well as the actions needed to maximise the
opportunities of the next decade to achieve the vision of a
wellbeing economy. Transport has a key role to play in
achieving this vision at a national and local level.
5 National Strategy for Economic Transformation
310

Page 311

North Ayrshire Council Local Transport and Active Travel Strategy 
12
Regional 
Strathclyde Partnership for Transport’s (SPT) Regional
Transport Strategy (RTS) sets out the vision for transport in
the region that:
‘The west of Scotland will be a well-connected, attractive and
low carbon place with active, liveable communities and
accessible, vibrant centres facilitated by a high quality,
sustainable and resilient transport system shaped by the
needs of all’.
The vision is underpinned by three priorities:
• A healthier environment, supported by a transport system
that helps our region become a low carbon place with
healthier natural and built environments for the benefit of
all.
• Inclusive economic growth, underpinned by a transport
system that supports regional economic development and
growth, with better opportunities and fairer outcomes for
all.
• Improved quality of life, supported by a transport system
that helps everyone to have better health and wellbeing
and lead active, fulfilling lives.
This LTATS considers the actions in the RTS that are
relevant to North Ayrshire, and these are included in the 
6 About The Deal | Ayrshire Growth Deal
Delivery Plan. Partnership working with SPT will be essential
for the delivery of several of the actions.
The Ayrshire Growth Deal6 is a partnership driven forward
by the Scottish Government, the UK Government and East,
North and South Ayrshire Councils. It has a vision for Ayrshire
to be ‘a vibrant, outward looking, confident region, attractive
to investors and visitors, making a major contribution to
Scotland’s growth and local well-being, and leading the
implementation of digital technologies and the next
generation of manufacturing.’
The Deal has secured funding to help realise Ayrshire’s
potential as a world-class business region for the aerospace
and space, energy, tourism, manufacturing and engineering
industries, and reaffirms the commitment to the region and
the collective desire to support ambitious plans for renewal
and long-term sustainable growth. The provision of
appropriate transport infrastructure is important to the delivery
of the vision.
The Ayrshire Regional Economic Strategy (2023) sets out
a bold 10 year vision for the Ayrshire economy and for
Ayrshire residents and businesses. It is the first strategy of its
kind for the region, and the first in Scotland to feature
Community Wealth Building as a founding principle. Its vision
is that:  
311

Page 312

North Ayrshire Council Local Transport and Active Travel Strategy 
13
Ayrshire will be a region where wealth is shared fairly, to
enable people of all ages to live full and healthy lives. Our
region will be outward looking, attractive to investors and
visitors, making a major contribution to Scotland’s economic
development. 
We will also prioritise the protection of our natural wealth and
culture. This is how our residents, communities, institutions
and enterprises will rise to the opportunities and adapt to the
challenges of the future.
Addressing the key transport challenges facing the Ayrshire
economy including improving physical infrastructure by
addressing poor road linkages and reduced and unreliable
public transport and supporting a just transition to Net Zero
are key priorities of the LTATS and ARES.
The LTATS will to contribute to achieving the six regional
priorities and associated outcomes including Good Health
and Wellbeing and Stronger Places and Communities.  A
Delivery Plan* is currently being developed for the Strategy
and will consider potential transport interventions.
* At the time of development of this draft LTATS the ARES
Delivery Plan is still in draft format. Updated information will
be included prior to the finalisation of this strategy. 
The Ayrshire Freight Strategy (2016) was developed by
SPT, North Ayrshire Council and the Ayrshire Roads Alliance.
This provides a strategic road network and freight access 
7 https://northayrshire.community/working-together/our-priorities/
strategy to key freight locations along with an associated
signing strategy. The strategy also sought to identify
opportunities to provide HGV parking and examine options for
transport hubs for freight transfer or local distribution.
Local 
The LTATS will interact with many other Council strategies. 
Our Council Plan 2023-2028 explains how we will meet our
communities’ needs and expectations over the next five
years. Our mission is Working together to improve the lives of
our people in North Ayrshire to achieve our vision of a North
Ayrshire which is fair for all. The strategic aims of the new
plan are:
• To transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people
• We will have active, inclusive and resilient communities
• To achieve net zero by 2030
• A Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing
resources towards our priorities
The North Ayrshire Partnership Plan 2022-20307 sets out
what the Council wants to achieve with our Community
Planning partner organisations and influences how all
partners operate locally. A number of Active Travel and 
312

Page 313

North Ayrshire Council Local Transport and Active Travel Strategy 
14
Transport actions will help deliver the NAPP vision of ‘North
Ayrshire – Fair for All’. It has three key themes:
• Wellbeing – We will address health inequalities. We will
promote children and young people’s wellbeing. We will
enable community wellbeing.
• Work – We will increase employment. We will develop
volunteering. We will better support our young people.
• World – We will work together to reduce carbon emissions
and mitigate the impacts of climate change. We will
increase active travel. We will increase carbon literacy
within our organisations and communities.
The Local Development Plan 2 (2019)8 has an essential link
with the LTATS in terms of land use and transport integration.
Well planned developments, with associated well-planned
and designed sustainable transport provision will support the
vision and strategic priorities of the LTATS.
The Community Wealth Building Strategy (CWBS)9 sets
out NAC’s ambitious plans to become a Community Wealth
Building Council, working in partnership with communities and
businesses to create a fair local economy, reducing poverty
and inequality. Addressing transport inequality is a key aim of
both the LTATS and CWBS. 
8 LDP2 (north-ayrshire.gov.uk)
9 Community Wealth Building Strategy
The third Environmental Sustainability and Climate
Change Strategy (2021-2023)10 builds on the carbon
reduction success of its predecessors and establishes a new
target ‘to reduce and remove emissions for North Ayrshire to
achieve net-zero carbon status by 2030’.  A refreshed
strategy, Sustainable North Ayrshire, is currently being
developed.
Addressing transport and travel is an important workstream in
this plan. The strategy recognises that many initiatives are
already underway to support carbon reduction from transport
through the implementation of the Council’s Electric Vehicle
Strategy (2021-2025)11, which aims to increase the number
of Electric Vehicles (EVs) used in North Ayrshire, and also by
implementing numerous active travel projects.
10-year local Island Plans12 have been developed with and
for North Ayrshire’s island communities.  These aim to drive
the development of community economic and environmental
wellbeing of Arran and Cumbrae. Public transport and
infrastructure and transport reliability are key thematic
priorities for the Plans with a range of transport related
actions identified to support their delivery.  
10 Environmental Sustainability & Climate Change Strategy (north-
ayrshire.gov.uk)
11 Electric Vehicle Strategy (north-ayrshire.gov.uk)
12 Island Plans Website
313

Page 314

North Ayrshire Council Local Transport and Active Travel Strategy 
15
Figure 2-1 presents a summary of some of the most important
national, regional and local strategy documents which are
relevant to the new LTATS.
314

Page 315

North Ayrshire Council Local Transport and Active Travel Strategy 
16 
Figure 2-1 Summary of Key Policies
315

Page 316

North Ayrshire Council Local Transport and Active Travel Strategy 
17
3 Background Information
This chapter summarises key relevant demographic and
transport statistics for North Ayrshire. These statistics provide
context for the new strategy, highlighting some of the high-
level issues and opportunities in the area and emphasising
the differing needs of people within different parts of North
Ayrshire. 
North Ayrshire Overview 
The projected increase in the older population and presence
of rural communities will result in an increasing need to
enable transport access to key services such as healthcare
as well as to employment. 
Deprivation and Employment 
North Ayrshire has a total of 186 data zones in the SIMD
data, of which 52 (28%) were in the 15% most deprived in
Scotland in 2020, representing an increase compared with
the 2016 data. The majority of these are in the Irvine and
Three Towns areas. Since 2004 (the start of SIMD data), the
number of North Ayrshire data zones in the 15% most
deprived in Scotland has increased by 58%, from 33 to 52.
There are also data zones in North Ayrshire which score
among the least deprived in Scotland, mainly located in the
North Coast. This variation in deprivation in North Ayrshire
means that the new strategy must cater for the varying needs
and priorities of different areas.
316

Page 317

North Ayrshire Council Local Transport and Active Travel Strategy 
18
The relatively low employment rate presents a challenge to
better connect people to jobs throughout North Ayrshire.
In 2018 the North Ayrshire Inclusive Growth Diagnostic
report, a joint piece of work between the Office of the Chief
Economic Advisor at the Scottish Government and North
Ayrshire Council, was published aiming to assess what is
holding back long-term sustainable inclusivity and growth in
the area. The paper found that transport issues create real
barriers to inclusive growth, with travel costs, frequency and
connections between modes limiting the potential
opportunities for people to access jobs.
317

Page 318

North Ayrshire Council Local Transport and Active Travel Strategy 
19
Travel – Statistics from the Scottish Travel Diary 2019 
Key Points:
• Travel to work by car is more popular in North Ayrshire than
Scotland as a whole
• Bus use is generally on a downward trend in North Ayrshire
• Rail use is generally on an upward trend in North Ayrshire
• Walking and cycling did not see consistent or sustained
growth from 2015-19
• The above present challenges and opportunities for the new
strategy
318

Page 319

North Ayrshire Council Local Transport and Active Travel Strategy 
20
Key Points:
• Satisfaction with public transport services generally
decreased from 2015-19
• Overall car ownership is generally in line with national
averages
• More than half (52%) of North Ayrshire residents travel less
than 5km to work – this presents an opportunity for these
journeys to be made by active and sustainable modes  
319

Page 320

North Ayrshire Council Local Transport and Active Travel Strategy 
21
4 Consultation and Vision,
Strategic Priorities and
Objectives
Consultation
Overview
An extensive consultation exercise was undertaken between
February and April 2022 to gather feedback on the key issues
and suggestions relating to transport in North Ayrshire that
the new LTATS should seek to address. Given the recent
pandemic, multiple methods were used to gauge as wide an
opinion as possible on transport in North Ayrshire. This
feedback has shaped the vision, strategic priorities and
objectives for the strategy.
Stakeholder Engagement
Stakeholder engagement was undertaken during 2022 via a
series of online facilitated workshops. This included the
following:
• Elected Members Workshop
• Accessibility Workshop
• Stakeholder Workshops 
Stakeholders were also able to respond to an online survey
that was hosted on a dedicated website.
Online Consultation
An online survey was promoted through North Ayrshire
Council’s website and social media pages. This was aimed at
gathering feedback from members of the public on their
current travel behaviour and attitudes, views on active travel,
and the issues and opportunities that should be considered
within the new strategy. 
Public Events
Public drop-in events were held in seven locations across
each locality area in North Ayrshire: Irvine, Beith, Largs,
Kilwinning, Saltcoats, Brodick and Millport. The events
gathered qualitative feedback from the public on their views
on issues and opportunities to improve active travel and local
transport in North Ayrshire, as well as promoting the online
survey. Information on the current strategy, along with local
maps of the transport and active travel networks were shown
at the events for people to comment on and feedback was
collected at the events.
320

Page 321

North Ayrshire Council Local Transport and Active Travel Strategy 
22
Street Surveys
On street surveys were also carried out in the same towns as the drop-in events. These aimed to gather both quantitative and
qualitative feedback from the public on their current travel behaviour and attitudes, views on active travel, and any issues and
opportunities with the current active travel and local transport network.
The full consultation process is shown below. 
321

Page 322

North Ayrshire Council Local Transport and Active Travel Strategy 
23
Developing the Vision, Strategic
Priorities and Objectives
Our vision, strategic priorities and objectives build on the
previous strategy and reflect the views expressed during the
stakeholder and community consultation. These have been
informed by workshops with stakeholders, feedback from the
public and a background review of other relevant policies and
strategies.  
These outline what we want to achieve while having regard to
the vision and priorities of related national and regional
strategies. They reflect the impact of transport on the
environment and the need to reduce carbon emissions from
transport, in support of NAC’s declaration of a Climate
Emergency, and the three key themes of Wellbeing, Work
and World from the North Ayrshire Partnership Plan. They
also recognise the importance of supporting communities
through inclusive access to employment, education and key
services.
The LTATS plays a vital role in enabling and encouraging
people to walk, cycle and wheel more often, thereby creating
healthier communities. This focus on active travel is shown by
the inclusion of a detailed active travel strategy chapter.
The Vision, Strategic Priorities and Objectives are shown
below.
Vision 
North Ayrshire will have a sustainable and well-
connected transport network that meets the needs of
all, supports an inclusive economy, healthier
communities and creates an attractive place in which
to live, work, visit and do business
322

Page 323

North Ayrshire Council Local Transport and Active Travel Strategy 
24
Strategic Priorities
Our three strategic priorities contribute to the overarching
vision and provide a strategic context for what we want to
achieve from our LTATS. 
Objectives
The five objectives provide more detail on what the LTATS
aims to achieve.  
Strategic Priorities
• Enhancing the range of
sustainable transport
opportunities to enable well
connected access to
employment, education and
services.
Accessibility for
All
• Improving the transport
network and connectivity in
North Ayrshire and beyond to
create an attractive place for
businesses and communities
to thrive
Inclusive
Economy
• A transport network that
enables sustainable healthy
travel choices underpinned by
a low carbon ethos to improve
the quality of life for everyone
Healthier
Communities
LTATS Objectives
Access to Employment and Services
• Improve accessibility, availability, affordability and safety of the
transport system, ensuring everyone can access town centres, jobs,
education, healthcare and other everyday needs
Reduce Emissions
• Reduce carbon emissions caused by transport in North Ayrshire
Active Travel and Communities
• Encourage and enable physical activity and improved health and
wellbeing in the communities for all through active travel
Confidence in Public Transport
• Improve the reliability, accessibility, safety, personal security, and
integration of public transport services for all
Transport Network Condition
• Maintain the condition of the existing roads and active travel network
323

Page 324

North Ayrshire Council Local Transport and Active Travel Strategy 
25
Additional objectives have been developed for the dedicated
Active Travel Strategy (Chapter 5): 
Active Travel Strategy Objectives
Enable people to walk, wheel and cycle within
their local communities and to key attractors by
the provision of a convenient, attractive, high
quality and safer active travel network
Facilitate an increase in the proportion of all
journeys made by walking, wheeling and
cycling
Deliver training, events and promotion of active
travel to encourage and enable more people to
travel by active means
324

Page 325

26
Active Travel Strategy
325

Page 326

North Ayrshire Council Local Transport and Active Travel Strategy 
27
5 Active Travel Strategy
Overview
What is Active Travel?
Active travel relates to making journeys in physically active
ways, such as walking, cycling, wheeling (i.e. the use of a
wheelchair or other mobility aid) and horse riding. The
benefits of active travel include improved health, improved
community safety, and reduced environmental impacts.
Importance of Active Travel
Active travel has an
important role to play
in achieving carbon
reduction targets by
switching short
journeys which are
often made by car to
walking, cycling and
wheeling. This
contributes to the
Council’s net zero
ambitions and
declaration of a climate emergency.
Replacing short car journeys will also contribute to reduced
congestion and air pollution, creating a healthier environment
for communities.
It is recommended that active travel networks are developed
as part of a wider and coherent green infrastructure network,
to ensure that multiple beneficial opportunities for both health
and wellbeing and the environment are not missed.
Health and Wellbeing
Enabling better to access to employment and community
services is essential to the health and wellbeing of our
communities. Promoting equality is one of North Ayrshire’s
core values and this Active Travel Strategy offers ways in
which people in North Ayrshire can improve their health by
being more active and benefit their sense of wellbeing
through the creation of personal connections through better
accessibility and active travel initiatives. Active travel can also
support increased tourism by making North Ayrshire an even
more attractive place to visit.
Multi Modal Travel
Active travel modes also play a vital role in multi-modal
journeys through walking, cycling and wheeling trips to and
from public transport interchanges. Making these ‘last mile’
trips as attractive and convenient as possible can make multi-
modal journeys more appealing than using a car for an entire
journey and can create positive travel behaviour change.
Integration between active modes and public transport is
326

Page 327

North Ayrshire Council Local Transport and Active Travel Strategy 
28
therefore essential in encouraging people to travel more
sustainably. 
COVID Impact
The COVID-19 pandemic and associated lockdowns
impacted on active travel with more people walking and
cycling, particularly within their local areas during travel
restrictions. Emergency active travel infrastructure was
implemented through the Sustrans Spaces for People
initiative which involved widening and upgrading 18 key active
travel routes and providing new cycle parking at 40 locations
across North Ayrshire.
Monitoring of cycling levels in North Ayrshire (see Figure 5-2)
found that were was a significant increase in active travel
during the 2020 lockdowns, compared with previous years.
This illustrates that there is a significant opportunity, as we
move forward from the pandemic, to capitalise on the
increased interest and uptake in active travel by continuing to
invest in high-quality active travel infrastructure and behaviour
change programmes in North Ayrshire. 
13 A Fairer, Greener Scotland: Programme for Government 2021-22 -
gov.scot (www.gov.scot)
Strategy and Policy Context
National
In A Fairer, Greener Scotland: Programme for
Government, 2021-2213, the Scottish Government made a
commitment that at least £320 million or 10% of the total
transport budget is spent on active travel by 2024‑25,
ensuring greener, cleaner and better-connected communities. 
This highlights the importance placed on active travel by the
Government and a recognition of its contribution to securing a
net zero carbon future in a just and fair way. 
Strategies and policies at national, regional and local levels
provide a context for this Active Travel Strategy. Many of
these policy documents are referred to in Chapter 3 and will
not be repeated here. However, key active travel documents
are outlined below.
The Active Travel Framework, 201914 brings together the
key policy approaches for improving the uptake of walking
and cycling in Scotland for travel. 
14 Active Travel Framework (1) | Transport Scotland
Active Travel Framework Vision
Scotland’s communities are shaped around people, with walking
or cycling the most popular choice for shorter everyday journeys. 
327

Page 328

North Ayrshire Council Local Transport and Active Travel Strategy 
29
The Active Travel Vision is accompanied by objectives that
promote healthier, fairer, and more environmentally friendly
choices while creating more pleasant, economically viable,
safer and sustainable places:
• Cut carbon emissions and other pollution  
• Deliver liveable, more pleasant communities  
• Better health and safer travel for all  
• Reduce inequalities - jobs, services, leisure  
• Support delivery of sustainable economic growth
Let’s Get Scotland Walking: The National Walking
Strategy Action Plan 2016-2026 (Revised 2019)15 has the
following strategic aims:
• Develop a daily walking culture – everyone, everyday
• Deliver on creating a culture of walking where
everyone walks more often as part of their everyday
travel and for recreation and wellbeing
• Develop walkable places and spaces for everyone
• Achieve better quality walking environments with
attractive, well designed and managed built and
natural spaces and places for everyone 
15 Let's get Scotland Walking - The National Walking Strategy - gov.scot
(www.gov.scot)
16 Active Scotland Delivery Plan - gov.scot (www.gov.scot)
17 Cycling Action Plan for Scotland 2017-2020 | Transport Scotland
A More Active Scotland - Scotland’s Physical Activity
Delivery Plan, 201816 has a vision of a Scotland where more
people are more active, more often.
The Cycling Action Plan for Scotland, 2017-202017 set out
a robust set of actions to work towards the vision of ‘10% of
everyday journeys to be made by bike, by 2020’. A new
Cycling Framework and Delivery Plan for Scotland is in
development and is expected to be published during 2023.
Regional
The draft Regional Transport Strategy 2022-3718 was
published by SPT for consultation in summer 2022. It includes
an ambition to develop and deliver a regional active travel
network across the SPT area.
Local 
NAC Core Paths Plan (2009)19 ensures that each town and
village in North Ayrshire has a basic framework of paths
available for recreation and everyday journeys by local people
and visitors.
NAC Outdoor Access Strategy20 provides a framework for
reviewing the existing situation in terms of provision, use,
policy and resources and a means for agreeing and co-
ordinating priorities for future outdoor access. 
18 Draft Regional Transport Strategy
19 CPP Document (north-ayrshire.gov.uk)
20 Outdoor-Access-Strategy (north-ayrshire.gov.uk)
328

Page 329

North Ayrshire Council Local Transport and Active Travel Strategy 
30
Planning 
Planning policy will determine the future look and feel of North
Ayrshire. Planning and active travel are closely linked, and
when considered together, can result in significant benefits in
terms of planning new developments and active travel routes.
Planning policy at a national, regional and local level
encourages developments which provide, or are located near
to, as many key services as possible to minimise the need to
travel longer distances and to encourage active travel for
short trips. Developments should also link into and enhance
existing active travel networks whilst providing high-quality
internal routes, enforcing the travel mode hierarchy set out in
NTS2 through physical layouts which control motorised traffic
speeds and create accessible and permeable
neighbourhoods.
Existing Active Travel Network
There are three National Cycle Network (NCN) routes within
North Ayrshire, as shown in Figure 5-1. 
• NCN7 runs from the border of South Ayrshire through
Irvine, Kilwinning and the Garnock Valley, before
continuing north towards Paisley and Glasgow. 
• NCN73 connects Kilmarnock to Ardrossan and continues
on the Isle of Arran between Brodick and Lochranza. 
• NCN753 is still under development. It runs from Ardrossan
to the North Coast. Work is continuing to improve this
route and create additional off-road sections. 
Figure 5-1 Strategic Active Travel Network 
329

Page 330

North Ayrshire Council Local Transport and Active Travel Strategy 
31
North Ayrshire has a number of nationally recognised and
scenic walking routes, including the Arran Coastal Way and
the Ayrshire Coastal path.
Under the Land Reform (Scotland) Act, non-motorised users
have a statutory right of responsible access to most land and
inland water, provided that they do so in a responsible way.
Likewise, land must be managed in a way that respects
responsible access rights. North Ayrshire has an extensive
wider network of core paths, developed as part of the
Council’s responsibilities under the Act. These are paths
which give the public reasonable access to cross land, with
no set physical standards. Core paths can therefore vary
significantly in their construction from wide multi-user tarmac
paths to narrow grass paths.
There is a strong horse-riding community in North Ayrshire
who take advantage of the area’s many outdoor spaces and
path networks.
Active Travel Statistics
Key statistics have from the 2022 Annual Cycling Monitoring
Report by Cycling Scotland have been analysed to
understand the key trends for active travel in North Ayrshire.
The statistics reported have been affected by changes to the
methods of data collection for a number of data sources due 
21 Monitoring Cycling in Scotland - Making Cycling Better - Our
Programmes - Cycling Scotland
to the impact of the Covid-19 pandemic, most significantly is
the Scottish Household Survey, previously mentioned. Data
has, therefore, been taken from both the 2021 and 2022
reports. 21 
Key Stats and Trends
• Over half of journeys in North Ayrshire are less than 5km
and therefore potentially suitable for active modes
• 41% of North Ayrshire residents have access to one or
more bikes for private use, which is below the national
average of 45%
• There is a general upward trend in active travel over the
period of 2018 – 22 (see Figure 5-2)
• The COVID-19 lockdowns during 2020 can be seen to
have significantly increased active travel in the region,
with a drop off in 2021, however in 2022 levels are close
to those in summer 2020
• The proportion of employees cycling to work regularly in
North Ayrshire in 2022 was higher than the national
average –data for 2019 (see Chapter 4) showed cycle to
work rates were lower than the national average
330

Page 331

North Ayrshire Council Local Transport and Active Travel Strategy 
32 
Figure 5-2 Average Daily Pedestrians and Cyclists Across North Ayrshire (Source
–NAC Counter Data)
Workplaces
Based on the Cycling Scotland data, the proportion of
employees cycling to work regularly in North Ayrshire is 2.7%,
which is higher than the national average of 1.9%
The Cycling Friendly Employer Fund, financed by Transport
Scotland, is awarded to organisations to develop projects that
encourage staff and visitors to travel by bike. This funding can
be used to install cycle parking, upgrade minor (workplace
specific) pedestrian / cycle routes, upgrade changing areas,
showers, lockers and drying areas etc. It can also be used to
fund bike pools, hire fleets or maintenance areas and tools.
In North Ayrshire, there are currently nine Cycling Friendly
Employers employing a total of 4,115 staff. North Ayrshire
Council itself is a Gold-accredited Cycling Friendly Employer.
Schools
Compared to the period between 2014-2019, there has been
an increase in pupils cycling to both primary and secondary
school. The proportion of primary school pupils cycling to
school has increased by approximately 7%, and secondary
school pupils by approximately 38%.
Results from the Sustrans Hands Up School Surveys found
that the proportion of primary school pupils in North Ayrshire
walking to school was 43.2% in 2018, 43.0% in 2019, and
37.9% in 2020. For secondary school pupils, the walking
figures were 48.8% in 2019, 48.9% in 2019, and 39.5% in
2020. The figures for 2020 may have been affected by the
Covid-19 pandemic.
In North Ayrshire, there are 10 Cycling Friendly Schools,
reaching 2,674 pupils. Cycling Friendly Schools receive
funding to purchase equipment and cycle parking to help
overcome barriers to cycling.  Encouraging pupils to cycle
builds confidence, keeps kids healthy, and engages hard to
reach students. 
Safety
The number of pedestrian and cyclist casualties resulting
from road traffic accidents in North Ayrshire is decreasing as
0
1000
2000
3000
4000
5000
6000
Jan-18
May-18
Sep-18
Jan-19
May-19
Sep-19
Jan-20
May-20
Sep-20
Jan-21
May-21
Sep-21
Jan-22
May-22
Sep-22
331

Page 332

North Ayrshire Council Local Transport and Active Travel Strategy 
33
shown in Figure 5-3 and Figure 5-4. Total pedestrian
casualties have dropped by more than 50% since 2014 (from
37 to 18), with cyclist casualties decreasing by 50% from 16
to 8, demonstrating significant progress in improving road
safety for vulnerable users. 
Figure 5-3 Pedestrian Casualties (Source – NAC data) 
Figure 5-4 Cyclist Casualties (Source – NAC Data)
Active Travel Strategy Objectives
The Active Travel Strategy supports the overall vision,
strategic priorities and objectives for the LTATS, as outlined
in Chapter 5. It also has the following additional objectives:
• Deliver a well-connected and accessible active travel
network 
• Facilitate an increase in the proportion of all journeys
made by walking, wheeling and cycling 
• Deliver training, events and promotion of active travel
to encourage more people to travel by active means.
0
5
10
15
20
25
30
35
40
2014 2015 2016 2017 2018 2019 2020 2021
Pedestrian Casualties Fatal
Pedestrian Casualties Serious
Pedestrian Casualties Slight
Pedestrian Casualties Total
0
5
10
15
20
2014 2015 2016 2017 2018 2019 2020 2021
Cyclist Casualties Fatal
Cyclist Casualties Serious
Cyclist Casualties Slight
Cyclist Casualties Total
332

Page 333

North Ayrshire Council Local Transport and Active Travel Strategy 
34
Progress
The Council has implemented a variety of projects and
initiatives to encourage people to walk and cycle more often.
These focused on three areas: infrastructure, behaviour
change, and improving access to active travel for all. Some
case studies are provided below.
Infrastructure
Case Study – Tarryholme to i3 Enterprise Area Active
Travel Link
The i3 Irvine Enterprise Area is located to east of Irvine and
covers around 132 hectares. It is Scotland’s largest
Enterprise Area and focused on offering long term
development opportunities to Life Sciences businesses or
related industries. Currently, i3 is home to around 30
businesses with over 1,000 employees in the area.   
Access to i3 is largely by car. There are bus stops to the north
in Greenwood and the rail station is 2.2 miles away. There is
a good network of local paths within this area, but they are
not attractive or accessible. The nearest cycle route is the
NCN73 but there was no attractive or direct access into the i3
from this off-road route. 
Funding was secured from Sustrans ‘Places For Everyone’
fund to build a new 3.5 metre all abilities shared use path to
improve access to the site. This involved upgrading the
existing path at Tarryholme (shown in blue to the right) and
constructing a new path between the A78 underpass and the
i3 (shown in green): 
This new off-road
connection includes
fencing, solar studs,
resting points, signage,
tactile paving and
dropped kerbs. 
This new link connects
i3 to the residential
area of Tarryholme.
This provides a more
attractive route towards
Irvine town centre, rail station, leisure centre and various
other visitor attractions. It also provides more equitable
333

Page 334

North Ayrshire Council Local Transport and Active Travel Strategy 
35
access to employment for those who don’t or can’t use other
travel modes. 
Behaviour Change 
Supporting and encouraging people to change their travel
habits is a key element of efforts to reduce private car use for
short journeys and increase the use of active modes. NAC
provides significant support to residents, employers and
community groups to facilitate behaviour change in schools,
workplaces and other settings.
NAC’s Active Travel team, including the Workplace
Engagement Officer, Road Safety Officer and the Trinity
Active Travel Hub, work together to increase cycling, walking
and wheeling activities by raising awareness of new and
existing routes and supporting people with training and
confidence to use them.
Case Study - Trinity Active Travel Hub
The Trinity Active Travel Hub is
located in the former Trinity
Church in Bridgegate, Irvine.
The hub was opened in 2019
following significant funding
support from a number of key
partners including Transport
Scotland and Energy Saving
Trust with the European
Regional Development Funds
(ERDF) and the Low Carbon
Travel and Transport Challenge
Fund, Additional support was also provided by SPT. 
This combination of funding streams supported the
development of the Active Travel Hub including kitting the
building out with an office space, activity area and
establishing a bike library. It was also used to create the
Circuit, an off-road cycle loop at Quarry Road (Link to The
Circuit video); upgrade paths leading towards Irvine town
centre; installation of cycle repair stands at several North
Ayrshire railway stations and to employ one full time staff
member for 12 months. 
334

Page 335

North Ayrshire Council Local Transport and Active Travel Strategy 
36
The Trinity Active Travel Hub delivers
a range of activities to support active
travel as well as sign posting users to
existing services. Activities are
designed to raise awareness and
develop confidence so that
individuals are better informed and
more confident to make active travel
decisions. Activities include Nordic
walking classes and health walks
which are designed to give people
the confidence that they can walk the short distances to their
local shops and facilities. These are carried out across North
Ayrshire with the support of NAC staff and volunteers. Cycle
rides and skills training give new and inexperienced cyclists
more confidence in using their bikes. 
The hub provides skills
sessions such as basic
bike maintenance and
puncture repair, giving
people the ability to fix
minor bike problems when
out and about. Basic learn
to ride and ‘come and try’
e-bike sessions are held
at the Circuit in Quarry Road. Bespoke walking and cycling
activities can also be arranged to cater for the needs of
specific groups. Volunteers who wish to support the Trinity’s
activities can be provided with training such as walk leader,
cycle ride leader and first aid. The building is also used for
drop-in information events. The Trinity team support partners
events and promote our offer of services within the
community. More information about The Trinity can be found
on the Trinity website. There is also a video of the Trinity Hub
available.
Events
North Ayrshire Council also hosts events aimed at promoting
active travel and building community support.
The Ayrshire Women’s Cycle
Festival is an annual festival
supporting and inspiring
women in Ayrshire to cycle
more regardless of their current
cycling ability or experience.
The festival has been running
for five years and is delivered
in partnership with the
Kilmarnock Active Travel Hub,
Ayr Active Travel Hub and Trinity Active Travel Hub. 
In May 2022, Pedal Irvine offered a great opportunity for
local families and people interested in cycling to come
together and enjoy some of the best local cycle routes Irvine
has to offer.
335

Page 336

North Ayrshire Council Local Transport and Active Travel Strategy 
37
The fun, free and inclusive mass participation cycle event was
organised by the Trinity Active Travel Hub and was supported
by Active Schools and Cycling Scotland.
Over 300 people took part in the ride. All riders with a range
of abilities, some as young as three years old, managed to
complete the 8km route successfully. 
In September 2022, the Ayrshire Walking Festival was held
for the first time. The festival was hosted in partnership with
the East, North and South Ayrshire Active Travel Hubs to
promote walking for health and for a greener way to travel for
short journeys. The festival featured led walks by local
organisations, catering for all abilities, ages and interests. A
total of 33 organisations and 147 individuals took part in 48
walks across Ayrshire. It is hoped that this will become an
annual event.
Partnership Working and Access for All
It is vitally important that active travel is made accessible to
people of all abilities and ages. The Council works closely
with community partners such as Arran Access Trust, Eco-
Savvy, Project Kilbirnie and the Beith Trust, amongst others,
to offer support via training courses such as Cycle Ride
Leader, Walk Leader, bike maintenance and more.
Furthermore, the ‘Community Outdoor Access Grant’ is soon
to be revamped and relaunched to allow Community Groups
to bid for enhanced funding to deliver both active travel
initiatives and access improvements.
The Trinity Active Travel Hub is based in Irvine. This works
with partners across North Ayrshire to bolstering delivery
throughout the area.
The Trinity Hub will continue to work with partners such as
Paths for All, Transport Scotland, SPT and Sustrans to bid for
and utilise grant funding to deliver our behaviour change
programmes and improve our active travel network
infrastructure. 
Participant quote - “We had a fab morning. My wee
boy had just learned to ride his bike the week
before, having been really wobbly for a few weeks
up until then and he had the best time.”
336

Page 337

North Ayrshire Council Local Transport and Active Travel Strategy 
38
Key Issues and Actions for Active Travel
The key issues identified through our research and engagement with the public and key stakeholder groups, as well as the
main actions to address them are summarised as follows. A full set of actions for active travel can be found in the Delivery Plan
in Chapter 9. Area specific proposals for each of the six localities in North Ayrshire are in the following sections. 
337

Page 338

North Ayrshire Council Local Transport and Active Travel Strategy 
39
Locality Proposals
Arran
The Isle of Arran has a section of NCN73, which runs
between Brodick and
Lochranza. This route is
almost exclusively on road.
The geography and
topography of Arran
presents a challenge for
active travel between the
main settlements, although
the popularity of e-bikes is
leading to an increase in
demand for better routes
despite the gradients. 
Arran is a popular tourist
destination attracting
people who enjoy the
outdoors and like to be
active. Several active
travel initiatives have been
implemented by Arran Eco
Savvy Community to
benefit residents through
the Sustainable Island Life Project.
Strategic Infrastructure Aspirations
Strategic active travel infrastructure aspirations for Arran are
shown below, with details provided on the next page. 
Case Study Sustainable
Island Life project
Key Achievements:
• 209 tonnes of CO2
reduced
• eBike loan scheme
• eBike charging network
established with 22 local
businesses signing up
• Bike maintenance
stations installed at the
north and south of the
island
• Workplace eBike
scheme set up,
launched and operated,
with 43 participating
businesses
338

Page 339

North Ayrshire Council Local Transport and Active Travel Strategy 
40
Map
Reference
Route Name Details
1 Brodick to Lamlash
Strategic Corridor
Long-term aspiration for a new off-road active travel corridor between Brodick and Lamlash. It
would offer residents and visitors to the island a viable alternative to car travel between the two
towns. This route would be aimed at both commuters and island visitors. 
2 Brodick to Corrie Route
Improvements
Improved off-road route between Brodick and Corrie. The current NCN73 is on-road. 
339

Page 340

North Ayrshire Council Local Transport and Active Travel Strategy 
41
Garnock Valley
NCN 7 runs through the Garnock Valley, to the east of Dalry,
before heading through Glengarnock and Kilbirnie. The route
is currently on-road between Dalry and Glengarnock, with an
off-road route between Kilbirnie and Lochwinnoch to the
North.
There is also an existing shared use path which provides a
connection between Dalry Road in Beith and Glengarnock
Community Campus.
Strategic Infrastructure Aspirations
Strategic active travel infrastructure aspirations for the
Garnock Valley are shown below. 
Map Reference Route Name Details
1 Beith –
Glengarnock –
Kilbirnie Strategic
Corridor
Continue to improve links
between Beith, Glengarnock and
Kilbirnie by extending the existing
connection between Beith and
Garnock Community Campus to
provide a strategic active travel
corridor. The route should also
provide new and improved
connections to NCN7 in
Glengarnock and Kilbirnie,
Lochshore and improved
connections to Glengarnock rail
station.
2 Dalry to Kilbirnie
Strategic Corridor 
Work is continuing to assess
alignment options for providing an
active travel route between Dalry
and Kilbirnie. The long-term
aspiration is to complete an off-
road route between Kilwinning
and Kilbirnie.
3 B714 Funding opportunities are being
investigated to deliver an active
travel route adjacent to the
upgraded B714. Work is
underway to deliver active travel
connections to Dalry.
340

Page 341

North Ayrshire Council Local Transport and Active Travel Strategy 
42 
Kilwinning
NCN 7 connects Kilwinning to the Garnock Valley, via a
predominantly on-road route to the north, and to South
Ayrshire via Irvine. NCN 73 also connects Kilwinning and the
Three Towns, via a mix of on- and off-road sections. 
A community and stakeholder engagement exercise was
undertaken in Spring 2020 to identify improved local active
travel connections in Kilwinning. The project was split into two
schemes: ‘The Small Links’ scheme, which is a set of three
short east-west links to be created or upgraded across
Kilwinning, and a second scheme looking at improvements to
routes across Blacklands Recreation Ground. Two of the
three Small Links paths have been delivered. Work is
progressing on the development of the other paths.
Strategic Infrastructure Aspirations
Strategic active travel infrastructure aspirations for Kilwinning
are shown to the right and are detailed on the next page.  
341

Page 342

North Ayrshire Council Local Transport and Active Travel Strategy 
43
Map Reference Route Name Details
1 Kilwinning to
Dalry Strategic
Corridor
Aspiration to provide a strategic off-road route between Kilwinning and Dalry to form part of a wider
strategic corridor between Kilwinning and Kilbirnie with view to realigning existing NCN7 on-road
sections to an off-road setting.
2 NCN7/73 to Town
Centre / Rail
Station
New and improved connections between the town centre / rail station and the existing NCN Route
7/73 to improve local connectivity.
3 NCN connections
- Castle Park,
Irvine to Irvine
Road, Kilwinning
through Eglinton
Park
Continue to work with Sustrans and other partners to create a quality off-road route through
Eglinton Park linking Castlepark, Irvine to Kilwinning.
4 Blacklands
Recreation
Ground and
McGavin Park 
Improvements to walking and cycling routes in and around Blacklands Recreation Ground and
McGavin Park. 
342

Page 343

North Ayrshire Council Local Transport and Active Travel Strategy 
44
Irvine
NCN7 connects Irvine to Kilwinning and to the South Ayrshire
coast. NCN73 connects Irvine with surrounding villages such
as Dreghorn, Springside and on to Kilmarnock.
The two NCN routes provide good connectivity between Irvine
town centre, the rail station, and Irvine Beach Park.
Strategic Infrastructure Aspirations
Strategic active travel infrastructure aspirations for Irvine and
the surrounding area are shown on the right, with details
provided on the next page. These proposals are based on the
findings of the ‘Irvine Cycle Friendly Town’ project and aim to
better connect the different areas of Irvine and the adjacent
villages. 
343

Page 344

North Ayrshire Council Local Transport and Active Travel Strategy 
45
Map
Reference
Route Name Details
1 Girdle Toll to
Irvine
Seek to provide a strategic active travel corridor between Girdle Toll and Irvine.
2 Irvine Cycle
Friendly Town
Project
Improve and upgrade connectivity to wider Irvine area, i3and surrounding villages, including
Springside, Drybridge, Bourtreehill and Dreghorn.
3 NCN73
Improvements
Incrementally upgrade sections of NCN73 and improve connectivity.
4 Heatherhouse
Road to NCN7
Local connection between Heatherhouse Road and NCN7 to the southwest
5 Town Centre
Connections
Improved connections to Irvine town centre from the existing active travel network
6 NCN7 Irvine to
South Ayrshire
Improved and more direct NCN 7 alignment between Irvine and South Ayrshire.
344

Page 345

North Ayrshire Council Local Transport and Active Travel Strategy 
46
North Coast
The North Coast locality features several local active travel
connections but lacks longer distance strategic routes. A
long-term aspiration is to fill these gaps with a view to
creating a primarily off-road NCN 753 link from Ardrossan to
the Inverclyde, north of Skelmorlie.
There is a shared use path between Seamill and the
Montfode roundabout in Ardrossan alongside the A78, which
has recently been upgraded by Transport Scotland to provide
a 4m corridor. Recent works are also ongoing to provide a
new off-road, coastal path through Fairlie.
There is also an existing off-road route between Kelburn and
Largs, which ends at the promenade path in Largs. Work is
underway to consider potential upgrades to this route to
provide additional connectivity to Largs town centre and the
ferry terminal.
Cumbrae is a popular island for leisure cycling, but there is
significant potential for increased functional active travel trips
on the island, particular for commuting between Millport and
Largs. Early feasibility work has begun to identify
improvements for active travel between the Cumbrae ferry
slip and Millport.
Strategic Infrastructure Aspirations
Strategic active travel infrastructure aspirations for the North
Coast are shown to the right, with details provided on the next
page. 
345

Page 346

North Ayrshire Council Local Transport and Active Travel Strategy 
47
Map
Reference
Route Name Details
1 Largs to
Skelmorlie
Investigate options to provide an off-road or quiet route for NCN 753 between Largs and
Skelmorlie and on to the boundary with Inverclyde.
2 Fairlie to Largs Improve existing off-road route and connections between Fairlie and Largs. NAC have funding
from Transport Scotland to complete Phase 3 of the Fairlie Coastal Path, which will provide an
off-road active travel corridor from the Fairlie Viewpoint car park to Bay Street. This section is
anticipated to be completed in 2023/24 pending agreements being reached with landowners.
NAC are also undertaking a study of ‘Largs Promenade’ to consider options to improve the
corridor from Largs Yacht Haven along the promenade to Aubery Park.
3 Millport to
Cumbrae Slip
Improved walking and cycling route between the ferry terminal and Millport.
4 Fairlie – West
Kilbride/Seamill
– Ardrossan
Investigate an improved alignment between Fairlie, West Kilbride, Seamill and Ardrossan.
346

Page 347

North Ayrshire Council Local Transport and Active Travel Strategy 
48
Three Towns
The Three Towns of Ardrossan, Saltcoats and Stevenston are
served by NCN 73, which provides a connection to Kilwinning
to the east, and onwards to Irvine and Kilmarnock. The route
is predominantly off-road, with some quiet on-road sections.
Ardrossan Connections
Ardrossan Connections is a
partnership project between
Sustrans Scotland, North
Ayrshire Council and
Ardrossan Community
Development Trust which
aims to improve public
spaces, improve transport
connectivity and increase
footfall within Ardrossan for the benefit of local people,
businesses, and visitors alike.
Infrastructure improvements being considered include
upgrades to the existing NCN, rerouting sections of the NCN
and placemaking opportunities in Ardrossan.
A variety of behaviour change activities will also be delivered,
including free cycling skills sessions, bike maintenance
classes and led rides. Local businesses will be offered a
package of activities to help enable employees to travel to
work actively such as promoting Cycle to Work Schemes and
helping employers access funding for cycle storage. 
Strategic Infrastructure Aspirations
Strategic active travel infrastructure aspirations for the Three
Towns are shown on the next page.  
347

Page 348

North Ayrshire Council Local Transport and Active Travel Strategy 
49 
Map
Reference
Route Name Details
1 NCN73 to
NCN753
Connection(s) between
NCN73 and NCN753 to be
delivered through the
Ardrossan Connections and
Ardrossan Coastal Path
projects. 
Map
Reference
Route Name Details
2 Ardrossan
Harbour
Improvements
Improved active travel connections and
facilities at and around the ferry terminal and
Ardrossan Harbour and Town rail stations. 
3 B714  Funding opportunities are being investigated
to deliver an active travel route adjacent to the
upgraded B714. Work is underway to deliver
active travel connections to Saltcoats.
4 Stevenston to
NCN73
New and improved local connections between
Stevenston and NCN73.
5 Glasgow
Street /
Princes Street
Active travel improvements along Glasgow
Street and Princes Street as part of the
Ardrossan Connections project
6 Old
Caledonian
Railway
Upgrade to existing route along the former
Caledonian railway. Work is also underway to
look at the feasibility of an eastern tie in point
to the Old Caledonian Railway cutting at the
Canal Street Bridge
348

Page 349

50
Public Transport
349

Page 350

North Ayrshire Council Local Transport and Active Travel Strategy 
51
6 Public Transport
Overview
North Ayrshire has an expansive public transport system,
providing an alternative to travelling by private vehicle and, in
some cases, a lifeline service for island, rural and remote
communities. Public transport services include buses, rail and
ferry services. There are several broad aims which may
influence considerations about public transport service. These
include:
• To provide a service for people who do not currently
use public transport.
• To improve the quality of service for existing
passengers; helping to maintain the existing passenger
base and generating additional trips.
• To contribute to social inclusion; providing services for
people without access to private vehicles and for
whom walking and cycling are not viable.
Public transport is essential for connecting communities to
key services, employment opportunities, and to each other.
This is particularly important in areas with high deprivation
and low car ownership. 
Existing Network
Rail
The vast majority of rail passenger services in Scotland are
operated by ScotRail whereas the rail infrastructure including
tracks and signals is owned and operated by Network Rail.
Funding for rail projects in Scotland is controlled by Transport
Scotland and potential projects have to follow the
Government’s approval process.
North Ayrshire has 12 rail stations, situated on the Glasgow to
Ardrossan/Largs and Glasgow to Ayr lines. These offer
regular connections within North Ayrshire and onwards to
Glasgow and Ayr. 
Figure 6-1 Rail Network in North Ayrshire (source – ScotRail)
350

Page 351

North Ayrshire Council Local Transport and Active Travel Strategy 
52
Figure 6-2 shows the total rail passengers (entries and exits)
for the period 2004 to 2020. The figures demonstrate the
steady and consistent growth in passenger numbers on
services in North Ayrshire, with a 28% increase from 2004-05
to 2018-19 (the last year for which data was unaffected by
Covid-19).
Figure 6-2 Total Rail Passengers in North Ayrshire (Source – Office of Road and
Rail)
Figure 6-3 shows the busiest stations in North Ayrshire, with
the size of the blue circles representing the number of
passengers from 2021-22. Kilwinning station has the most
passengers (approx. 450,000) and operates as an
interchange station, with Irvine second (440,000) and Largs
third (250,000). 
Figure 6-3  Rail Passengers at Stations in North Ayrshire (Source – Office of Road
and Rail)
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
4500000
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
Total Passengers
351

Page 352

North Ayrshire Council Local Transport and Active Travel Strategy 
53
Bus
Bus services in Scotland are typically run by commercial
operators. SPT, as the Regional Transport Authority, can
support socially necessary services in areas where there is
no commercial provision. Funds, however, are limited and
several factors have to be considered before decisions on
subsidising a service can be taken. 
In June 2022, new powers were announced in the Transport
(Scotland) Act 201922 which allow transport authorities to run
local bus services, giving them more flexibility over the
operation of services to meet the needs of local residents.
Further consideration of the powers provided through the Act
will be taken alongside SPT. 
The main bus operating companies in North Ayrshire include
McGill’s, Stagecoach, ShuttleBus and SPT’s MyBus. 
Notable key bus services include:
• Stagecoach service 11 connecting Ardrossan, Saltcoats
and Stevenston to Kilwinning, Irvine and Kilmarnock. 
• Stagecoach Service 585 serving the Ayrshire coast from
Largs, through West Kilbride, the Three Towns and Irvine,
and towards Prestwick and Ayr.
• McGill’s Buses’ Clyde Flyer services (901 and 906)
between Largs and Glasgow, via Inverclyde, and their 904 
22 Transport (Scotland) Act 2019
service connecting Largs with the Garnock Valley and
Paisley.
Additional services are provided by Shuttle Buses, an
employee-owned company, which operates smaller vehicle
services between Kilwinning, Irvine and surrounding areas,
and also the Largs circular service.
SPT operates on an agency basis on behalf of North
Ayrshire, including managing contracts for school bus
services, maintaining bus stops, processing disabled persons
National Entitlement Card (NEC) renewals, administering the
SPT Zonecard and the Strathclyde Concessionary Travel
Scheme.
Bus Service Issues
In general, the bus network in North Ayrshire has contracted
and issues with availability of bus service routes, reliability,
frequency and operating times were identified through the
public consultation for the new LTATS. People highlighted the
lack of bus services as impacting their ability to access key
services without using a car, particularly in rural areas. As a
result, there is a significant reliance on subsidised bus
services to meet residents travel needs with funding allocated
to the provision of these subsidised bus service. 
Service frequencies were reduced during the Covid-19
lockdowns, and many North Ayrshire residents highlighted
that these have not been restored to previous levels following
352

Page 353

North Ayrshire Council Local Transport and Active Travel Strategy 
54
the lifting of travel restrictions. Furthermore, bus passenger
numbers declined during Covid due to travel restrictions and
concerns about using public transport and patronage has not
returned to pre-pandemic levels.
While bus service provision is of great concern to many
people in North Ayrshire, it is encouraging that Stagecoach
has announced that popular bus services in and around
Ayrshire are being increased in a bid to help connect
communities across the region.
Ferry
Ferry services are an essential part of North Ayrshire
Council’s transport network. Transport Scotland is
responsible for the provision of ferry services in Scotland. The
ferry services in North Ayrshire are part of the Clyde and
Hebrides network and are operated by CalMac Ferries Ltd,
with Caledonian Maritime Assets Ltd (CMAL) managing the
port infrastructure. 
North Ayrshire Council work closely with Transport Scotland,
CalMac and CMAL to seek improvements to the ferry network
and services. There are five ferry terminals within North
Ayrshire:
• Ardrossan and Largs on the mainland
• Brodick and Lochranza on Arran
• Cumbrae Slip on Great Cumbrae
There are two key passenger ferry routes connecting
mainland North Ayrshire to its islands of Cumbrae and Arran.
These are essential to enable islanders to access mainland
services and allow tourists to access the islands, thereby
supporting their economies. Both routes are also substantially
used for freight and commuting. 
Figure 6-4 Ferry Services in North Ayrshire
353

Page 354

North Ayrshire Council Local Transport and Active Travel Strategy 
55
Plans are in place for significant infrastructure improvements
at the Ardrossan Harbour terminal. These works are required
to accommodate a new vessel, which will operate on the
Ardrossan to Brodick route and provide improved service
reliability and resilience.
Figure 6-5 shows the number of passengers using the ferries
on Arran. Passenger numbers were steadily increasing in the
lead up to the Covid-19 pandemic and associated travel
restrictions. 
Figure 6-5 Passenger Numbers on Arran Ferry Services
In 2014 Transport Scotland implemented the Road Equivalent
Tariff (RET) fares policy on the Arran ferry routes, with the
Largs-Cumbrae route following in 2015. The principle of RET
is that ferry fares should be equivalent to travelling the same
distance by road, plus a fixed cost element. The aim was to
reduce the cost disadvantage faced by island communities
and promote the islands as a place to live, work, and visit. 
Transport Scotland undertook an assessment of the impact of
the RET in the first year of its implementation on the
Ardrossan-Brodick and Largs-Cumbrae routes against
predicted numbers without the RET. This found that
passenger numbers increased on both routes and, in
particular, the number of cars using the services increased
significantly more so than overall passenger numbers. 
Figure 6-6 Passenger and Vehicle Increases on Ferry Services Against Forecast
due to RET (Source – Transport Scotland)
A subsequent study was released by Transport Scotland in
2021 which assessed the longer term impact of the RET.
Figures show that passenger and car carryings continued to
grow on the Largs-Cumbrae routes in 2017 and 2018,
although the growth was significant than it the first year of the
RET. Passenger carryings on the Ardrossan-Brodick route
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
2017 2018 2019 2020 2021
Total Passengers
354

Page 355

North Ayrshire Council Local Transport and Active Travel Strategy 
56
continued to rise over the same period, however there was a
slight drop in car carryings in 2018 compared with 2017.
The report goes on to detail results of surveys which aimed to
identify the impact of the RET on the residents of the affected
routes. The Largs-Cumbrae and Ardrossan-Brodick routes
were classified under Firth of Clyde Routes. Approximately
80% of respondents said that their use of the routes had been
unaffected by the RET, with the main reason being the
widespread prior use of multi-journey discounted tickets
meaning the RET did not save them money. 
In terms of the impact on residents, survey respondents were
asked to agree/disagree with various statements on the
impact of the RET on their communities. The most agreed
with impacts for Firth of Clyde residents were increased day
trip visitors, parking on the islands becoming more difficult in
summer, and roads on the islands becoming too
busy/congested during the summer. The most disagreed with
statements were that quality of life on the island had
improved, and that there were improved leisure/eating and
drinking/shopping opportunities.
The increase in car trips has created demand management
issues at and around the four ferry terminals, particularly
Largs and Cumbrae, and has increased traffic volumes on
Cumbrae and Arran.
Ferry Issues
The reliability and resilience of ferry services were frequently
raised during the public consultation for this LTATS. 
Residents highlighted that delayed and cancelled services
between the mainland and Cumbrae/Arran were causing
significant disruption in terms of accessing key services,
operating businesses, and for visitors to the islands.
The lack of reliability of the ferries has impacted on residents
being able to access medical and other important
appointments with the resulting impact on their physical and
mental health and wellbeing. It has further resulted in a
reduction in residents. It also affects supply chains for island
businesses, creating barriers to developing the island
economies.
Tourism has also been impacted, given the unreliability and
cancellation of services, creating a barrier for people to
access the islands.
Consultees called for better and more reliable ferries to
support their way of life on the North Ayrshire islands.  
355

Page 356

North Ayrshire Council Local Transport and Active Travel Strategy 
57
Key Achievements
The key improvements for public transport over the period of
the previous Local Transport Strategy have been focused on
improving physical infrastructure. 
The new Brodick Ferry Terminal, the main gateway to
Arran, was opened in April 2018. The £30m project provided
a new 110m, two-berth pier and a new two-storey terminal
building. Improvements were also made to access, with
increased queuing space for vehicles, six bus stances, and a
65-space car park. 
A consultation exercise and associated options study was
undertaken in 2022 to identify improvements that could be
made to improve access for all users on the Largs-Cumbrae
ferry service. 
Following the completion of the consultation, the Council is
progressing with improvements at both terminals, comprising:
• Largs terminal – additional short queuing lane, footway
widening, consideration of Variable Message Signing on
the main approaches to Largs, and managing right turning
traffic from Bath Street joining the queue
• Cumbrae terminal – realignment of carriageway to provide
three queuing lanes closer to the ferry slip and
improvements to the footway network. The Largs
improvements are due to be implemented in 2022/23, with
the Cumbrae improvements to follow in 2023/24. 
356

Page 357

North Ayrshire Council Local Transport and Active Travel Strategy 
58
Significant improvements have also been made to bus stops
throughout North Ayrshire over the period of the previous
strategy, including new and improved shelters and
accessibility facilities, such as raised boarding kerbs,
improved seating and upgraded access paths.
In many areas buses are the predominant form of public
transport. Buses make effective use of limited road space and
can therefore make a substantial contribution to reducing
traffic congestion. However, buses themselves are often
affected by congestion, leading to longer journey times and
poor service reliability. Giving priority to late-running buses
can help to protect bus services from these effects.
Bus Route Congestion Reduction Measures - North
Ayrshire Council is currently implementing a Bus Priority
System through Ardrossan, Kilwinning and Irvine. This is a
key bus corridor which experiences delays at peak times
including the high frequency Service 11.
The priority system will improve bus journey times by
providing coordinated traffic signal timings using an Urban
Traffic Control (UTC) and late-running bus priority system.
This will result in buses benefiting indirectly as the overall
traffic flow is improved. This work is being done in partnership
with SPT and Transport Scotland.  
357

Page 358

North Ayrshire Council Local Transport and Active Travel Strategy 
59
Key Issues and Actions for Public Transport
The key issues identified through our research and engagement with members of the public and key stakeholder groups, as
well as the main actions to address them are summarised as follows. A full set of actions for public transport can be found in the
Delivery Plan in Chapter 9. 
358

Page 359

60
Road Network
359

Page 360

North Ayrshire Council Local Transport and Active Travel Strategy 
61
7 Road Network
Overview
North Ayrshire has three major trunk roads managed by
Transport Scotland. The A78 follows the west coast between
Inverclyde and South Ayrshire, while the A737/A738 runs
north-south through the Garnock Valley, connecting to
Renfrewshire to the north, and joining the A78 at Kilwinning.
North Ayrshire Council is responsible for the management
and maintenance of all other public roads. 
Other key routes in North Ayrshire include:
• A738 connecting Ardrossan, Saltcoats, Stevenston
• B714 connecting Dalry to Saltcoats 
• A760 connecting Largs and Lochwinnoch, via Kilbirnie.
This is a major tourist route for travellers driving from
Glasgow to Largs, and the ferry service to Millport
• A841 connecting the ferry terminals at Brodick and
Lochranza, and serving Lamlash and Whiting Bay, making
it a key route for tourism on Arran
• A71 connecting Irvine to Kilmarnock and onwards to
Glasgow 
Existing Network
The existing network is shown in Figure 7-1. 
Figure 7-1 Key Roads in North Ayrshire  
360

Page 361

North Ayrshire Council Local Transport and Active Travel Strategy 
62
Vehicle Traffic
Figure 7-2 shows that vehicle traffic has been on an upward
trend between 2014 and 2019, generally matching with a
slight decrease in public transport use over the same period,
as shown in Chapter 4. Increases in car journeys create
issues in terms of increased emissions and congestion, as
well as higher costs required to maintain the roads network.
One of the key challenges for the new LTATS is to reduce the
number of unnecessary trips made by private car and bring
down the overall level of traffic on the network. 
Figure 7-2 Total Vehicle Traffic in North Ayrshire (Source – NAC data) 
23 20% reduction in car km by 2030 | Transport Scotland
20% Reduction in Car km by 203023
In its update to the Climate Change Plan in 2020 the Scottish
Government has set the ambitious target to reduce the car
kilometres travelled in Scotland by 20% by 2030, compared
with a 2019 baseline. Producing over a quarter of all
greenhouse gas emissions, transport is the biggest
contributor to climate change in Scotland, with car emissions
accounting for 38% of all transport-related emissions.
The plan recognises that achieving this may be easier in
urban areas and rural areas may experience particular and
different challenges. 
700
720
740
760
780
800
820
Total Traffic (million vehicle
km)
361

Page 362

North Ayrshire Council Local Transport and Active Travel Strategy 
63
Road Safety
The Council’s Road Safety
Strategy 2022-30 sets out
the Council’s key policies
and actions for improving
the safety of roads, in line
with the national strategy:
Scotland’s Road Safety
Framework to 203024.
Casualties resulting from
road traffic collisions in
North Ayrshire are on a downward trend from 2014 to 21, as
shown in Figure 7-3. 
Figure 7-3 Road Collision Casualties in North Ayrshire (Source – NAC Data) 
24 Scotland's Road Safety Framework to 2030
Car Parking
NAC operates a number of car parks across North Ayrshire,
including:
• Car parks (Parking charges apply) at:
• Seafront Car Park, Largs
• Bellman’s Close, Largs (short stay)
• Long stay car parks at:
• Caledonian and Harbour Road, Irvine
• Union Street and The Braes, Saltcoats
• Woodwynd, Kilwinning
• Short stay car parks at:
• West Road (Bridgegate), Irvine
• Kirkgate, Irvine
• Oxenward, Kilwinning
• Chapelwell Street, Saltcoats
• Ferry terminal parking at Ardrossan, Millport and
Brodick
The Blue Badge scheme is in operation in North Ayrshire,
which allows disabled drivers, and those driving on their
behalf, to park in specially marked bays (time limit may apply)
0
100
200
300
2014 2015 2016 2017 2018 2019 2020 2021
All Casualties Fatal All Casualties Serious
All Casualties Slight All Casualties Total
362

Page 363

North Ayrshire Council Local Transport and Active Travel Strategy 
64
and on single or double yellow lines without time limits,
provided that it doesn’t cause obstruction or danger to other
road users.
The Council is introducing Decriminalised Parking
Enforcement as part of our traffic management strategy to
manage the traffic network effectively, improve or maintain
traffic flow and reduce congestion. This improves road safety
and the local environment and encourages, where
appropriate, increased use of more sustainable and healthy
forms of travel. The integration of enforcement powers and
parking policy will enhance our accountability to the residents
for the overall parking policy, as well as enable better
monitoring of the effectiveness and value of parking controls
to ensure that the parking policy is responsive to public
needs.
Key Achievements
Dalry Bypass and The Den Realignment
The Dalry Bypass was opened in summer 2019 and
encourages improved economic and employment
opportunities through better journey time reliability for
motorists and businesses along the length of the A737. 
In addition, the Dalry Bypass helps separate local traffic from
strategic traffic and improves safety for both rural road users
and communities. The A737 has also been realigned at The
Den. This 1km scheme bypasses a series of sub-standard
bends, improves traffic flow and provides road safety benefits. 
B714 Upgrade & Realignment
The upgrading of the B714 has been approved as part of a
successful North Ayrshire Council funding bid to the UK
Government's Levelling Up Fund. The B714 links the trunk
road network from the A78 Sharphill Roundabout (Three
Towns Bypass) to the A737, south of Dalry. It is a vital link for
road users travelling to the West Coast and ferry links to
Arran and Cumbrae. 
363

Page 364

North Ayrshire Council Local Transport and Active Travel Strategy 
65 
The upgrade of the B714 will significantly improve
connectivity between North Ayrshire and Glasgow, the
Central Belt and wider motorway network. This will
substantially increase the potential for tourism and economic
development and provide enhanced links to the Arran and
Cumbrae Ferry services. The improved alignment of the road
and removal of bends will also provide road safety benefits.
It will contribute to the repopulation of our islands and rural
areas by providing improved access between the ferry
terminals, mainland settlements, Glasgow, the central belt
and wider motorway network. 
This will ensure that those living in our rural, remote and
island communities are well connected and have equitable
access to services as those living in the rest of Scotland. It
will also divert a significant volume of traffic accessing the
A78 away from Kilwinning as traffic will connect directly to the
A78 via the new upgraded B714.
Once completed, the B714 Upgrade scheme will comprise
over 6.5km of new single carriageway.  Funding opportunities
are currently being investigated to deliver a segregated 3m
wide active travel route adjacent to the upgraded road.
Timber Transport Improvements
NAC has secured funding through the Strategic Timber
Transport Fund to improve several roads on Arran which are
associated with the transport of timber. This includes Ross
Road, Sannox Road, Machrie Moor Road and the A841. The
improvements undertaken include road widening, passing
places, road strengthening and re-surfacing works. These
improvements are aimed at reducing the impact of timber
transport on residents and visitors to Arran.
Network Condition
NAC is responsible for 874km of roads and 1,015km of
footways and footpaths. The condition of the network is
managed through NAC’s Road Assessment Management
Plan (RAMP). The RAMP sets out the Council’s approach to
the management and maintenance of its road assets. 
The overall condition of the network is measured by the Road
Condition Index (RCI), produced from the annual Scottish
Road Maintenance Condition Survey.  This Statutory
Performance Indicator is the percentage of the road network
that should be considered for maintenance treatment. A
364

Page 365

North Ayrshire Council Local Transport and Active Travel Strategy 
66
decrease in the reported RCI indicates an improvement in
road condition.   As shown below, North Ayrshire has an
improved overall RCI but is above the Scottish average over
the period (the lower the figures, the better the RCI is). 
…
RCI Comparison to Scottish average
Measure 2015-
17
2016-
18
2017-
19
2018-
20
2019-
21
2020-
22
2021-
23
North
Ayrshire  38.3 39.1 38.1 37.3 37.1 33.9 34.8
Scottish
average 36.4 36.7 36.3 35.8 35.5 34.2 33.6
Comparison
to Scottish
average
+1.9% +2.4% +1.8% +1.5% +1.6% -0.3% +1.2%
365

Page 366

North Ayrshire Council Local Transport and Active Travel Strategy 
67
Key Issues and Actions for the Road Network
The key issues identified through our research and engagement with members of the public and key stakeholder groups, as
well as the main actions to address them are summarised as follows. A full set of actions for the road network can be found in
the Delivery Plan in Chapter 9. 
366

Page 367

68 
Carbon Reduction
367

Page 368

North Ayrshire Council Local Transport and Active Travel Strategy 
69
8 Carbon Reduction
Overview
Reflecting the importance of reducing carbon emissions from
transport and its significant potential contribution to NAC’s net
zero carbon target, this chapter outlines the key issues,
opportunities and actions to support carbon reduction.
The National Transport Strategy 2 details the Sustainable
Travel Hierarchy where walking, wheeling, cycling, public
transport and shared transport options are prioritised over
single occupancy private car use. Sustainable freight
transport is also promoted for the movement of goods,
particularly the shift from road to rail.
The national
Sustainable Investment
Hierarchy outlines that,
when designing the
transport system,
options that focus on
reducing inequalities
and the need to travel
sustainably should be
prioritised. 
25 Carbon Neutral Cumbrae
In May 2022, Cumbrae was announced as one of six Scottish
islands to be supported by the Carbon Neutral Islands25
project, which aims to demonstrate the climate-resilience and
low carbon potential of islands by 2040.
NAC has stated its commitment to achieving net zero carbon
emissions by 2030 in the Environmental Sustainability and
Climate Change Strategy (2021-2023)26 and acknowledges
that rapid and far-reaching actions are required to achieve
this. The net zero carbon target is reflected in this LTATS
which identifies ways in which changing travel and transport
behaviour can contribute to reducing carbon emissions in
North Ayrshire. 
Reducing emissions associated with transport and travel is
about meeting future targets to protect the environment whilst
also offering benefits to local air quality which is vital for our
health and quality of life. Travel behaviour change takes
sustained long-term effort. It relies on providing sustainable
alternatives to the car that are practical and easy to use.
The key carbon reduction challenges are to:
• Reduce vehicle trips and distance travelled by cars
• Encourage a modal shift to walking, cycling, wheeling and
public transport from the car for short trips
• Support a higher proportion of low carbon vehicles in
NAC’s fleet, bus and community transport fleets, delivery
vehicles and private vehicles.
26 Environmental Sustainability Climate Change Strategy
368

Page 369

North Ayrshire Council Local Transport and Active Travel Strategy 
70
• Promote greener, cleaner travel choices such as walking,
wheeling and cycling
Key Achievements
Several actions have already been successfully implemented
by NAC to support low carbon travel behaviours.
Electric Vehicles
The Council’s first Electric Vehicle (EV) Strategy 2021-2527
sets out a vision to increase the number of EVs being used
throughout North Ayrshire by creating a robust network of EV
charge points. Growth in EV ownership has been steadily
growing from only 42 EVs registered in North Ayrshire in
2015, to 217 EVs by the end of 2020. 
Figure 8-1 Plug-In Vehicles in North Ayrshire (Source – Department of Transport
Stats VEH0131) 
27 Electric Vehicle Strategy
By December 2025, the Council’s aspirational target is to
have:
• One publicly accessible charge point for every nine plug-in
vehicles
• 2% of total number of vehicles registered in North Ayrshire
to be plug-in vehicles
• 80 workplace charge sockets.
EV Charging
NAC launched a
consultation exercise in
Spring 2022 to gather
feedback on the needs of
people and businesses
based in North Ayrshire with
regards to electric vehicle
charging infrastructure. The
feedback will be used to
support a business case for future funding for charging points.
The existing network of publicly accessible EV chargers is
shown in Figure 9-2.  0
50
100
150
200
250
2013 Q1
2013 Q3
2014 Q1
2014 Q3
2015 Q1
2015 Q3
2016 Q1
2016 Q3
2017 Q1
2017 Q3
2018 Q1
2018 Q3
2019 Q1
2019 Q3
2020 Q1
2020 Q3
369

Page 370

North Ayrshire Council Local Transport and Active Travel Strategy 
71 
Figure 8-2 EV Charging Points in North Ayrshire (Source - Zap-Map)
370

Page 371

North Ayrshire Council Local Transport and Active Travel Strategy 
72
Electric Buses
Stagecoach and Shuttle Buses secured funding through the
Scottish Zero Emission Bus Challenge Fund (ScotZEB) to
help bring fully electric buses into their fleets serving North
Ayrshire. 39 of these will be for Stagecoach services, and 5
will be for Shuttle Buses’ services. 28 
NAC’s Vehicle Fleet
The Council
established a car club
scheme to reduce
business miles
travelled and
associated emissions.
The scheme, as of
2020, had 1,000
members accessing electric and low emission vehicles at
various locations across the area. In 2019/20, 275,868 miles
were travelled using this initiative. 
Further grant funding was received during 2019/20 from the
Switched-on Fleet initiative, allowing for three additional
electric cars and five vans to be leased to further increase the
electric vehicle fleet to 19. 
28ScotZEB Electric Buses
Air Quality Improvements
We are required to compile and publish annual reports (link to
annual reports) on air quality in the region. Previous
monitoring reports identified two areas of concern in terms of
emissions from road traffic – High Street, Irvine and New
Street, Dalry – due to congestion. The 2022 Local Air Quality
Management Progress Report29 sets out the changes in air
quality following the implementation of mitigation projects to
address these issues, which included public realm
improvements on High Street Irvine, and the Dalry bypass.
The report demonstrates that these measures resulted in
immediate improvements in air quality in 2021. NAC will
continue to monitor these areas to identify the long-term
impacts with traffic levels returning to normal following the
COVID-19 pandemic.
School Initiatives
Targeting young people and their parents to change
behaviour by walking, cycling and wheeling more often to
school is essential for both carbon emissions reduction and
living a more active, healthier life. The following initiatives
have been introduced in schools:
• iCycle – School cycle proficiency scheme run since
2013. During the Covid-19 pandemic, all primary
schools were offered iCycle
29 2022 Local Air Quality Management Progress Report
371

Page 372

North Ayrshire Council Local Transport and Active Travel Strategy 
73
• ‘Go On Get Out There’ scheme – grant offering £500
per school for projects that support active travel
• Installation of cycle and scooter racks in schools
• Play on Pedals – this is a training scheme provided by
Cycling Scotland, starting on balance bikes, and aimed
at teaching pre-school children the basics about bike
parts, cycle control, how to fit a helmet correctly, and
the basics of looking after their bikes. Nurseries and
early years centres in North Ayrshire who have suitably
trained Play on Pedals instructors receive a bank of
bikes from Cycling Scotland. 
Workplace Initiatives
A variety of initiatives have been introduced to encourage
NAC employees to change their travel behaviour.
E-bikes have been loaned to more than 60 staff within the
last 12 months at various workplaces for a two-week trial to
encourage them to cycle more and be more active.
The Cycle to Work Scheme is available to employees and
there have been almost 200 participants in the scheme to
date. 
NAC promotes a workplace StepCount challenge twice a
year to encourage active travel, improved health and carbon
reduction for workplace travel. The June 2022 challenge
involved 199 participants (a 73% increase compared with the
October 2021 challenge) across 40 teams, with a total
distance of over 32,000 miles covered. 
Throughout the COVID pandemic the Travel Smart team
within NAC provided an electric bike to an employee within
Ayrshire Independent Living Network, who wanted to ensure
the safety or her client by not putting her health at risk by
using public transport throughout the pandemic. Providing this
employee with an electric bike supported her throughout the
pandemic removing the need for a 10-mile round walking trip.
Participant Quote - “I sold my car and plan to
use the bike / public transport as my main
methods of transport. This is a more
sustainable way of getting about and is much
cheaper than travelling by car.”
Participant quote - “The challenge really
motivated me to get moving and I do intend
to keep it up.”
372

Page 373

North Ayrshire Council Local Transport and Active Travel Strategy 
74
Key Actions for Carbon Reduction
The key actions for carbon reduction are shown below, organised under four key themes. The themes are derived from the key
challenges for carbon reduction set out at the beginning of this chapter. The full set of actions can be found in Chapter 9. 
373

Page 374

North Ayrshire Council Local Transport and Active Travel Strategy 
75 
9  Delivery Plan
Overview
This chapter sets out the Delivery Plan for the LTATS.
The proposed actions were assessed to ensure that they contributed to at least one of the LTATS objectives. The deliverability
of each action was also considered.
Objective Title Details
Access to
Employment and
Services
Improve accessibility, availability, affordability and safety of the transport system, ensuring everyone can access town
centres, jobs, education, healthcare and other everyday needs
Reduce Emissions Reduce carbon emissions caused by transport in North Ayrshire
Active Travel and
Communities
Encourage and enable physical activity and improved health and wellbeing in the communities for all through active
travel. Active Travel Strategy Objectives:
• Enable people to walk, wheel and cycle within their local communities and to key attractors by the provision of
a convenient, attractive, high quality and safer active travel network
• Facilitate an increase in the proportion of all journeys made by walking, wheeling and cycling 
• Deliver training, events and promotion of active travel to encourage and enable more people to travel by active
means
Confidence in
Public Transport
Improve the reliability, accessibility, safety, personal security, and integration of public transport services for all
374

Page 375

North Ayrshire Council Local Transport and Active Travel Strategy 
76 
Transport Network
Condition
Maintain the condition of the existing roads and active travel network 
The Plan outlines the proposed actions, which objective(s) it
meets and the indicative delivery timescales: 
• Ongoing = continuation of existing work 
• Short = 1 to 2 years 
• Medium = 2 to 5 years 
• Long = 5+ years 
Partnership Working
Delivery of the actions will, in many cases, require continued
and ongoing partnership working with national, regional and
local partners, including the main transport operators serving
North Ayrshire. NAC is committed to collaborating with
relevant partners and forums to achieve this. The delivery
plan identifies the key delivery partners for each action, where
applicable.
Funding
NAC has been successful in securing external funding to
deliver many projects identified in the previous LTS and will
continue to seek funding to support the actions in this
Delivery Plan through existing or new funding sources. 
The Council works closely with partners such as Transport
Scotland, SPT, Paths for All, the Strategic Timber Transport
Scheme and Sustrans to secure funding for the delivery of
transport projects.
375

Page 376

North Ayrshire Council Local Transport and Active Travel Strategy 
77 
Active Travel
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
AT1 – Carry out feasibility studies and technical
design to develop strategic active travel corridors
across the 6 localities. 
       Long
AT2 – Deliver infrastructure improvements on
strategic active travel corridors       Ongoing
AT3 – Continue to work with Sustrans to further
develop, improve and grow the National Cycle
Network
       Ongoing
AT4 – Continue to investigate funding
opportunities for an active travel route adjacent to
the upgraded B714.
     Short
AT5 – Improve local active travel links to key trip
attractors, facilities and transport interchanges       Medium
AT6 – Improve active travel connections to and
through North Ayrshire's greenspaces          Medium
AT7 – Continue to work with partners to develop
walking, cycling and wheeling opportunities         Ongoing
AT8 – Continue to work with community partners
to deliver behaviour change projects through direct
support, partnership working and grant funding
(Community Outdoor Access Grants Scheme)  
      Ongoing
AT9 – Continue to create active travel mapping,
videos and digital resources for all localities         Ongoing
376

Page 377

North Ayrshire Council Local Transport and Active Travel Strategy 
78 
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
AT10 – Continue to grow our workplace
engagement programme to provide advice and
support to encourage active travel  
      Ongoing
AT11 – Improve active travel access to schools
through improved routes and continue to expand
cycle training at primary and nursery school level
       Medium
AT12 – Undertake an audit of the active travel
network to identify priorities for improvements          Short
AT13 – Continue and expand programme of
maintenance for existing active travel routes         Ongoing
AT14 – Expand and improve facilities for active
travel such as cycle parking, rest stops and bike
maintenance stations    
    Short
AT15 – Continue to improve accessibility to active
travel routes for all abilities access, including
equestrian users    
    Ongoing
AT16 – Continue to grow and expand behaviour
change programme, including events, through
Trinity Active Travel Hub  
      Ongoing
AT17 – Work with operators and partners to
improve active travel facilities at transport
interchanges and increase capacity for bicycles on
public transport services 
    Short  
377

Page 378

North Ayrshire Council Local Transport and Active Travel Strategy 
79 
Public Transport
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
PT1 - Continue to engage with SPT and operators
to provide a coherent bus network both within
North Ayrshire and regionally
      
Ongoing
PT2 – Supporting the delivery of the community
transport pilot in North Ayrshire to establish
demand for community transport, with a view to
supporting future community transport delivery
       Medium
PT3 - Support SPT to develop a Level of Service
Framework for the region, which aims to maintain
and improve lifeline transport services for islands,
rural and remote areas
       Long
PT4 - Continue to engage with SPT and operators
to enhance provision and access to public
transport information
        Ongoing
PT5 - Support initiatives to improve real and
perceived safety and security of public transport
services.
        Ongoing
PT6 - Continue to engage with Transport Scotland
to prioritise the reliability and resilience of ferry
services
        Ongoing
PT7 - Continue to work with rail operators and
Transport Scotland to ensure that North Ayrshire       Ongoing
378

Page 379

North Ayrshire Council Local Transport and Active Travel Strategy 
80 
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
continues to be served by a frequent and reliable
rail network
PT8 - Continue to work collaboratively with
operators to improve integration between public
transport modes
      Ongoing
PT9 - Promote free bus travel for concessionary
travel and people under 22 years old        Short
PT10 - Work with operators, SPT and Transport
Scotland to make public transport ticketing more
flexible, affordable and integrated  
      Medium
PT11 – Work with partners, including SPT, to
explore the options for bus service operating
models through the new powers granted under the
Transport (Scotland) 2019 Act to ensure that our
communities are well connected and not
disadvantaged due to a lack of sufficient public
transport
        Short
PT12 - Work with partners to investigate the
potential to establish a Bus Service Improvement
Partnership (BSIP)      
   Medium
PT13 - Deliver the Ardrossan Harbour
improvement and transport interchange works and
cement Ardrossan's position as the 'Gateway to the
Islands' hub 
       Medium
379

Page 380

North Ayrshire Council Local Transport and Active Travel Strategy 
81 
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
PT14 - Work with operators, SPT and Transport
Scotland to improve public transport accessibility to
key employment areas and regional facilities
(including local healthcare facilities & hospitals) for
all North Ayrshire residents 
        Medium
PT15 - Continue to improve the quality of bus
stops including the provision of service information
including RTPI, shelters and high access kerbs
where feasible      
  Ongoing
PT16 – Continue to investigate and deliver bus
priority measures      Ongoing
PT17 – Support partners and operators to
transition to zero emission buses and taxis      Medium
PT18 – Work with operators to improve access to
public transport services for disabled passengers      Medium 
380

Page 381

North Ayrshire Council Local Transport and Active Travel Strategy 
82 
Road Network
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
RN1 - Investigate reducing speed limits on urban
roads/streets and implement 20mph speed limits in
residential areas and streets throughout North
Ayrshire    
    Medium
RN2 - Consider introducing appropriate speed
limits on rural roads throughout North Ayrshire         Medium
RN3 - Continue to reduce the impact of traffic on
communities and reduce casualties through
reviewing road safety hotspots and identify a
programme of improvements    
    Ongoing
RN4 - Ensure the condition of the roads and active
travel network is maintained using an asset
management approach.
        Ongoing
RN5 - Continue to seek funding for rural road
widening and strengthening improvements to
facilitate timber and goods transport, and bus
services
        Ongoing
RN6 - Work with partners to improve road
connections between North Ayrshire and the
greater Glasgow conurbation
        Medium
RN7 - Upgrade the B714 to improve connectivity
between North Ayrshire and Glasgow, the Central
Belt and wider motorway network, providing
        Medium
381

Page 382

North Ayrshire Council Local Transport and Active Travel Strategy 
83 
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
enhanced links to the Arran and Cumbrae Ferry
services.
RN9 - Support the implementation of Scotland’s
Road Safety Framework to 2030.         Ongoing
RN10 - Improve road connections within North
Ayrshire, for example the A841 between Brodick
and Lochranza and the A760 between Largs and
the A737
        Long
RN11 - Continue to engage with Transport
Scotland to deliver improvements on the trunk road
network
        Ongoing
RN12 - Reduce the environmental impact of road
construction works         Ongoing
RN13 - Implement Decriminalised Parking
Enforcement within North Ayrshire          Short
RN14 - Ensure that road improvement schemes in
North Ayrshire also seek to improve facilities for
active travel and public transport 
    Short  
382

Page 383

North Ayrshire Council Local Transport and Active Travel Strategy 
84 
Carbon Reduction / Travel Demand Management
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
CR1 - Assess the potential for and implement the
reallocation of road space for the provision of
sustainable transport infrastructure and services, in
line with the sustainable travel hierarchy  
      Ongoing
CR2 - Identify and implement travel demand
management measures which are required to
achieve the national 20% car km reduction route
map    
      Long
CR3 - Review and update North Ayrshire Council
Town Centre Car Parking Strategy        Short
CR4 - Continue to support schools in developing
and implementing travel plans        Ongoing
CR5 - Update and implement the Council's Staff
Travel Plan, including continuing to reduce the
need for staff to travel for work  
     Short
CR6 - Continue to deliver Workplace Engagement
Programme with local employers         Ongoing
CR7 - Ensure that new developments are
accessible by sustainable transport modes       Ongoing
CR8 - Consider the feasibility of implementing 20-
minute neighbourhoods        Long
383

Page 384

North Ayrshire Council Local Transport and Active Travel Strategy 
85 
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
CR9 - Continue and expand the Council's staff e-
bike loan scheme         Ongoing
CR10 - Promote the benefits of active travel for
work, leisure and other journey types through the
media and social media  
      Ongoing
CR11 - Continue to deliver workplace active travel
events and activities such as StepCount challenge
and cycle to work days/weeks  
      Ongoing
CR12 - Consider the feasibility of supporting
community car clubs, including electric cars         Short
CR13 – Continue to promote and encourage car
sharing services in North Ayrshire      Ongoing
CR14 - Encourage and support Transport Scotland
to deliver the national Car Demand Management
Framework 
    Medium
CR15 – Promote benefits of using active travel and
public transport for travelling to and on our islands      Short  
384

Page 385

North Ayrshire Council Local Transport and Active Travel Strategy 
86 
General / Multi-Modal
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
G1 - Promote North Ayrshire's priorities within
national and regional strategies, including STPR
processes
    
Ongoing
G2 - Work with partners to deliver North Ayrshire's
Island Connectivity Study      Medium
G3 - Work with island stakeholders and partners to
deliver transport actions within the Arran and
Cumbrae Island Plan annual action plans
     Short
G4 - Support the implementation of the Council's
Electric Vehicle Strategy         Medium
G5 - Consider the feasibility of introducing Mobility
Hubs      Long
G6 - Continue cross-boundary collaboration with
other local authorities and SPT to improve regional
transport routes and services
     Ongoing
G7 - Support the implementation of the
Environmental Sustainability and Climate Change
Strategy  
       Ongoing
G8 - Work with SPT and the Ayrshire Road
Alliance to implement the Ayrshire Freight Strategy
Action Plan  
      Ongoing
385

Page 386

North Ayrshire Council Local Transport and Active Travel Strategy 
87 
Action
Fit With Objectives
Timescales
Access to
Employment &
Services
Reduce
Emissions
Active Travel
and
Communities
Confidence in
Public
Transport
Transport
Network
Condition
G9 - Support initiatives to improve freight access to
ports and harbours in North Ayrshire in
collaboration with users and operators
        Medium
G10 - Work with the Timber Transport Forum to
improve timber transport in North Ayrshire          Ongoing
G11 - Work with our partners to apply and embed
Community Wealth Building principles within
transport activities and projects
     Medium 
386

Page 387

North Ayrshire Council Local Transport and Active Travel Strategy 
10 Monitoring and Evaluation
Monitoring
The Delivery Plan will be monitored annually throughout the
lifetime of the strategy to establish progress made towards
achieving the objectives, targets and delivery plan actions,
ensuring that the LTATS remains relevant and on-track for
delivery. 
Outcomes and Indicators
In order to monitor the progress of the LTATS, a number of
outcomes have been identified, along with indicators which
will be used to measure progress against the outcomes.
Data for the indicators will come from a range of national,
regional and local datasets. While the Scottish Census 2022
has not been listed as a data source because its results
have not yet been published, outputs from the Census will
be considered when they are published.
The proposed outcomes and indicators for the LTATS are
shown on the following page.
387

Page 388

North Ayrshire Council Local Transport and Active Travel Strategy 
Outcomes Indicators Source
Increase the number of people
choosing to walk, cycle and
wheel in North Ayrshire
• Proportion of short everyday journeys by walking and
cycling
• Proportion of journeys to school by walking, cycling and
wheeling
• Use of existing active travel routes
• Scottish Household Survey
• School Hands Up Survey
• People counters on active travel
routes
Increase in high quality
walking, cycling and wheeling
infrastructure is available to all
• Length of additional or improved walking and cycling
facilities 
• North Ayrshire Council
Reduction in carbon emissions • CO2 emissions estimates from road transport • UK local authority and regional
greenhouse gas emissions
published by Department for
Environment, Food and Rural
Affairs (DEFRA)
• NAC’s Baseline Emissions
Inventory
Reduction in car kms • Average journey distance  • Scottish Household Survey
• Annual local traffic estimates
(Transport Scotland)
• Monitoring indicators from
national 20% vehicle km
reduction route map (under
development)
388

Page 389

North Ayrshire Council Local Transport and Active Travel Strategy 
90 
Outcomes Indicators Source
Maintain road condition • Road condition compared to the Scottish local authority
average.
• Road Condition Indicators (via
Roads Asset Management Plan)
Improved public transport
satisfaction
• Proportion of adults who are satisfied with local public
transport
• Satisfaction of rail passengers with services
• Satisfaction of bus passengers with services
• Scottish Household Survey
• National Rail Passenger Survey
(NRPS)
• Annual Bus Passenger Survey 
389

Page 390

390