NORTH AYRSHIRE COUNCIL
26 September 2023
Cabinet
Title: North Ayrshire Asset Management Strategy & Plans
Purpose: To seek Cabinet approval of the refreshed North Ayrshire
Corporate Asset Strategy and associated Asset Management
Plans.
Recommendation: That Cabinet approves the North Ayrshire Corporate Asset
Strategy and Plans at Appendix 1.
1. Executive Summary
1.1 The Council has a variety of assets which are integral to service delivery. Asset
management is a structured and systematic approach to managing assets on an
ongoing basis. This approach addresses all phases of an asset's life cycle, from pre-
acquisition through to end of life.
1.2 This report introduces a new Corporate Asset Strategy incorporating individual Fleet,
Roads, Housing, Property, Open Space and ICT asset management plans. The review
has been informed by various key drivers including the North Ayrshire Council Plan,
our Community Wealth Building approach, climate change emergency and the ongoing
financial challenges facing the public sector.
1.3 Key areas of asset management opportunity will include how we maximise the use of
our land and property assets and how we can manage assets in such a way to
contribute to our Council Plan priorities of wellbeing, tackling climate change, and
supporting communities and local democracy, for example by investing in energy
efficiency measures and decarbonisation of buildings and fleet, or supporting
communities to acquire buildings through Community Asset Transfer.
1.4 Robust asset management also plays a key role in developing the Council’s Medium
Term Financial Strategy through the realisation of efficiencies and enhanced utilisation
of assets. The plans are also an integral delivery mechanism to ensure the Council
delivers ‘Best Value’. The proposed Corporate Asset Strategy and Plans at Appendix 1
reflect updated priorities and challenges to ensure an approach to asset management
that remains fit for purpose.
2. Background
2.1 The Local Government (Scotland) Act 2003 places a duty on local authorities to
demonstrate ‘Best Value’ in delivering their services and in managing any assets they
hold. Typically, individual councils hold assets worth millions of pounds and it is in the
interest of councils and their communities to ensure that the most effective use of these
assets is being made.
2.2 Asset management plans are essentially a decision-making framework used to identify
assets, their value, their use and how they support the Council’s overall aims and

Page 2

objectives. Asset management plans are therefore also important tools to assist in the
planning of capital and revenue expenditure.
2.3 More widely, there is a need for our asset management approach to align closely with
the North Ayrshire Council Plan, reflecting the strategic priorities of wellbeing,
communities and local democracy and climate change. In addition, a key objective of
Community Wealth Building is maximising the use and function of our land and
property assets for the benefit of local people. This includes exploring alternative use of
council owned assets for communities or businesses and supporting Community Asset
Transfer to grow community ownership.
2.4 The landscape in which Council services are delivered is constantly changing, with
direct impacts on how assets are used and managed. The shift to more agile working
patterns has changed how our buildings are used, and the development of several
school campus projects in recent years has provided opportunities for community
services to be co-located.
2.5 The current economic climate has significantly increased the operating and
maintenance costs of our asset portfolio and placed a renewed focus on the
sustainability of assets going forward.
2.6 The climate change emergency has far-reaching implications for our assets: the
decarbonisation of buildings and vehicles, infrastructure requirements for active
travel, opportunities to use our assets for renewable energy generation, and
protecting and enhancing our habitats to capture carbon.
2.7 The overall aims and objectives of our refreshed CAS are:
1. That our asset management approach is aligned to the delivery of key Council
and partner strategies, including the North Ayrshire Council Plan;
2. That we maximise the efficient and effective use of all Council assets for the
benefit of those that live, work, visit or do business in North Ayrshire as part of a
clear and co-ordinated framework;
3. That, through our sustainable change programme, we review our assets to
ensure that the portfolio is lean and fit-for-purpose and that opportunities to
reduce pressure on capital and revenue budgets are identified and delivered;
and
4. That available investment in assets is prioritised, with clear governance,
assessment and decision-making arrangements in place.
2.8 Audit Scotland published the latest Best Value Assurance Report for North Ayrshire
Council in June 2020. A key area of focus for the audit was how the Council manages
its assets. The report noted that the Council has demonstrated a culture of continuous
improvement since a previous report by the Accounts Commission in 2011. Central
to the approach is sound governance arrangements for asset management, and the
proposed CAS at Appendix 1 sets out the roles and responsibilities, prioritisation and
decision making criteria for our assets.
2.9 The refreshed CAS also provides the framework for performance and risk
management and reporting as part of our asset management approach.
2.10 The CAS includes individual asset management plans for the six categories of asset:
property, housing, roads, fleet, open space and ICT. Each individual asset plan aims
to ensure that the Council holds the right assets and that they are fit for purpose in
terms of condition, suitability, sufficiency and accessibility. The asset plans, including
condition survey information, are used to inform the capital investment programme.
3. Proposals

Page 3

3.1 It is proposed that Cabinet approves the refreshed Corporate Asset Strategy and Plans
at Appendix 1.
4. Implications/Socio-economic Duty
Financial
4.1 Implementation of the asset management plans associated with this report will be funded
through existing resources. Robust asset management planning allows the Council to
maximise the benefit from investment.
Human Resources
4.2 The asset management plans will be delivered from within existing resources.
Legal
4.3 These plans set the overall strategy for the Council’s assets. Individual assets (such
as those held by the Common Goods or Trusts) or particular proposals (such as sale
or asset transfer of assets) are subject to specific legal requirements. However,
overarching all is the duty on the Council to demonstrate Best Value in the use of its
assets and resources.
Equality/Socio-economic
4.4 Implementation of the asset management plans underpins the Council’s equality and
socio-economic duty, by, for example:
• Ensuring availability of affordable, accessible, well-maintained housing
• Ensuring access to public services through availability of well-maintained property
assets including schools, libraries and community centres
• Availability of quality public open spaces, for physical activity and health and
wellbeing benefits
Climate Change and Carbon
4.5 The Council’s asset management plans recognise the opportunities to tackle climate
change through efficient asset management, for example: investment in energy
conservation measures in our houses and non-domestic buildings; using our assets to
generate renewable energy; continued decarbonisation of our vehicle fleet;
construction of new electric vehicle charging points; and journey reduction through the
use of technology.
Key Priorities
4.6 The asset management plans are designed to support our Council Plan priorities by
setting out a framework for utilisation and management of assets that supports a
wellbeing economy, responds to the climate change emergency, and provides
opportunities for local decision making.
Community Wealth Building
4.7 Implementation and continued development of the asset management plans will
contribute to all strands of Community Wealth Building, in particular the utilisation of

Page 4

our land and assets. 
5. Consultation 
5.1 A cross-service officer working group was established to review and refresh the
approach to asset management and to ensure a consistency of approach in preparing
the individual asset management plans. The asset management plans have been
developed in consultation with partners and customers where appropriate. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact David W. Hammond, Head of Service
(Sustainability, Corporate Property & Transport), on 01294 324514. 
Background Papers
0

Page 5

APPENDIX 1 
NORTH AYRSHIRE COUNCIL 
CORPORATE ASSET MANAGEMENT STRATEGY & PLANS
2023-28

Page 6

1. Introduction
The Council has a variety of assets which are integral to service delivery. Asset
management is a structured and systematic approach to managing assets on an
ongoing basis. This approach addresses all phases of an asset's life cycle, from pre-
acquisition through to end of life. Effective asset management planning means knowing
what you own, where it is located, who is responsible for it, the operation and
maintenance costs, and what role the asset has in current and future service delivery.
As part of the asset management process, we need to ensure that assets are:
• fit for purpose
• used efficiently
• maintained on a sustainable basis
• matched in investment terms to service needs. 
This Corporate Asset Strategy (CAS) sets out a framework for the management of the
Council’s core assets and infrastructure, with individual, detailed asset management
plans for the Council’s key asset groups as appendices to the document. 
2. Aims & Objectives
Plans for the future should ensure that assets are used primarily to enable the most
effective provision of services together with the achievement of strategic objectives; and
that this should be done in the most efficient manner. The CAS aims to provide an
integrated approach to realising the Council’s overall strategic aims and objectives for
optimising assets.
The North Ayrshire Partnership Plan (NAPP) (formerly the Local Outcomes
Improvement Plan) is administered by the North Ayrshire Community Planning
Partnership and consists of public, private and voluntary organisations and groups
working together with communities through our six Locality Partnerships to make North
Ayrshire a better place to live. The NAPP has three key themes: Wellbeing, Work and
World.
Alongside the wider NAPP, the CAS and individual asset management plans play a
central role in delivery of the most recent Council Plan. The latest review of the CAS and
plans therefore reflects the following Council Plan priorities:
• Wellbeing
• Communities and Local Democracy
• Climate Change
• A Sustainable Council
Alongside delivery of day-to-day services, there are also a wide range of overarching
Council strategies where delivery is contingent on the effective use of assets, for
example:

Page 7

• Community Wealth Building Strategy
• Environmental Sustainability & Climate Change Strategy
• Local Housing Strategy
• Regeneration Delivery Plan
• Open Space Strategy
• Learning Estate Strategy
• Digital Strategy
• Technology Strategy
• Sustainable Change Programme
It is within this context that the aims and objectives of the CAS are set. These are:
1. That our asset management approach is aligned to the delivery of key Council
and partner strategies, including the North Ayrshire Partnership Plan and Council
Plan
2. That we maximise the efficient and effective use of all Council assets for the
benefit of those that live, work, visit or do business in North Ayrshire as part of a
clear and coordinated framework
3. That, through our sustainable change programme, we review our assets to
ensure that the portfolio is lean and fit-for-purpose and that opportunities to
reduce pressure on capital and revenue budgets are identified and delivered
4. That available investment in assets is prioritised, with clear governance,
assessment and decision-making arrangements in place
3. Drivers for Change
The landscape in which Council services are delivered is constantly changing, with direct
impacts on how assets are used and managed.
The shift to more agile working patterns has changed how our buildings are used, and
the development of several school campus projects in recent years has provided
opportunities for community services to be co-located.
The cost-of-living crisis has significantly increased the operating and maintenance costs
of our asset portfolio and placed a renewed focus on the sustainability of assets going
forward.
The climate change emergency has far-reaching implications for our assets: the
decarbonisation of buildings and vehicles, infrastructure requirements for active travel,
opportunities to use our assets for renewable energy generation, and protecting and
enhancing our habitats to capture carbon.
The Council are pioneers in Community Wealth Building (CWB) and launched
Scotland’s first Community Wealth Building Strategy in May 2020. CWB aims to retain
wealth and economic benefits within the local area, making our communities more

Page 8

inclusive, resilient and sustainable. A key objective of CWB is maximising the use and
function of our land and property assets for the benefit of local people. This includes
exploring alternative use of council owned assets for communities or businesses and
supporting Community Asset Transfer to grow community ownership.
The Council’s capital and revenue budgets continue to face significant pressure,
compounded by recent inflation and borrowing cost rises. There are less and less
resources available to meet the investment, operating and maintenance requirements
of our asset estate.

Page 9

7
4. GOVERNANCE
The diagram below provides the governance arrangements for corporate asset
management within the Council:

Page 10

3.1 Roles and Responsibilities
Audit Scotland published the latest Best Value Assurance Report for North Ayrshire
Council in June 2020. A key area of focus for the audit was how the Council manages
its assets. The report noted that the Council has demonstrated a culture of continuous
improvement since a previous report by the Accounts Commission in 2011. Central to
the approach is sound governance arrangements for asset management.
Cabinet approves the corporate framework and the medium and longer term
investment programme.
The Executive Leadership Team, the Capital Programme and Assets Group (CPAG)
and Directorate & Service Project Boards ensure officer co-ordination of corporate
asset management and support the Council and Cabinet at chief officer and senior
management levels.
CPAG is chaired by the Head of Finance, with representation from senior officers
across all Services. It meets on a monthly basis with the remit of:
• ensuring a strategic and corporate approach overview of asset management to
ensure the Council’s resources are deployed effectively
• developing and delivering the corporate asset management plans
• developing and delivering the Council’s capital investment programme,
minimising slippage on the delivering the programme
• developing clear criteria for investment of Council resources on asset matters
and assessing all investment business cases
• developing and monitoring performance across all asset classes
• developing a capital receipts strategy
• developing and implementing best practice in all asset matters
Chief Officers and Senior Managers are responsible for:
• working together to ensure a corporate approach to asset management is in place
and delivering the Council’s asset management plans and associated investment
programme
• contributing to the development and delivery of asset strategies and plans; and
• ensuring consultation on asset management is undertaken with all relevant
stakeholders
Directorate and Service Project Boards are responsible for:
• Ensuring capital and asset plans are being implemented efficiently and effectively
• Taking corrective action to ensure delivery plans remain with agreed parameters
of time and budget
• Escalating relevant issues to the Executive Leadership Team and and/or CPAG
3.2 Asset Plans
The Council’s CAS and plans have been reviewed in line with the CIPFA’s ‘A Guide to
Local Authority and Public Sector Asset Management’ published in 2020. Our assets

Page 11

are classified under six categories, with an associated plan for each as an appendix to
the CASL
Asset Plan Directorate Chief Officer
Property (including
Common Good assets)
Place Head of Sustainability,
Corporate Property &
Transport
Housing Place Head of Sustainability,
Corporate Property &
Transport/Head of Housing
& Public Protection
ICT Chief Executive’s Head of People & ICT
Roads including
structures, lighting and
water infrastructure
Place Head of Neighbourhood
Services
Open Space Place Head of Neighbourhood
Services
Fleet including vehicles,
plant and equipment
Place Head of Sustainability,
Corporate Property &
Transport

Page 12

Each individual asset plan aims to ensure that the Council holds the right assets and that
they are fit for purpose in terms of condition, suitability, sufficiency and accessibility. The
asset plans, including condition survey information, are used to inform the capital
investment programme. 
The asset plans follow a broadly similar structure, setting out the Council’s current
asset base, assessment against the categories within the CIPFA guidance, with an
action plan at the end of each document. 
5. Funding Strategy 
The Council’s 10-year Capital programme is aligned to the strategic priorities as set out 
in the Council Plan and is the product of the various plans and strategies which impact on
the assets and infrastructure of North Ayrshire Council. The plan is updated annually,
with a full refresh undertaken every three years. 
The current 10-year plan includes significant investment in key strategic projects such as
investment in the Councils learning estate (for example Ardrossan Campus and
Montgomerie Park Primary school), and the Ayrshire Growth Deal which will see the
regeneration of the region through investment in strategic infrastructure across various
sectors, including life sciences, tourism, manufacturing and aerospace. 
The Capital investment is funded from a variety of sources including the General Capital
grant, Scottish Government Specific Capital Grants, Ayrshire Growth Deal, capital
receipts and the use of internal funds. However, most of the Council’s funding comes
from Prudential Borrowing. 
The revenue implications of both the individual projects included within the Programme
and the additional borrowing costs associated with the overall programme have been
incorporated within the Medium Term Financial Plan 2023/24 to 2025/26. Any further
revenue implications associated with those projects which are still to be finalised and will
be reported once the detailed business cases have been approved. 
6. Performance 
The Council must underpin asset management, business case development and
capital and revenue decision making with robust asset performance data. The Council’s
Performance Strategy set out our framework for managing and reporting on performance. 
In relation to asset management plans, there are a number of performance indicators as
part of our performance framework that provide intelligence on our asset management
performance

Page 13

1 
ASSET MANAGEMENT PLAN 
PROPERTY

Page 14

2 
Ensuring that the estate is used as effectively and efficiently as possible.
Overseeing day to day management, including maintaining and repairing existing
properties.
Developing new buildings that are well designed and fully meet service needs.
Identifying and disposing of surplus properties through locality planning with
Directorates.
Capital project delivery.
Effective management of leases and licences.






Our role - In North Ayrshire Council (NAC) our properties, and corresponding budgets, are
managed centrally by the Property Management and Investment division who act as the
“Corporate Landlord”. This enables our resources to be prioritised and directed where
they are most needed and ensures the property portfolio is aligned with the Council’s
strategic objectives. We work with services, partners and elected members to develop
innovative solutions for adapting our non-housing property portfolio to better support the
changing business needs of our services. 
It is our role to manage the Council’s portfolio effectively, providing best value for our
services and the people of North Ayrshire. Managing the portfolio includes: -
1. Introduction 
The Property Asset Management Plan (PAMP) underpins strategic decision making at the
Corporate Landlord level across the Council and is prepared by Property Management &
Investment (PMI). PMI is part of the Place Directorate and responsible for managing the
Council’s housing and non-housing property assets.
The plan covers all the Council’s interests in buildings and its main purpose is to: -
 set out the Council’s objectives, priorities, programme, and performance in relation to
property.
 provide a clear statement of direction for other property stakeholders and customers. 
The PAMP is one of the Council’s principal policy and performance documents which supports
the delivery of the Council Plan. This PAMP is a technical plan to deliver property services
based on the “how”. It is intended to be a clear statement of the strategy to be followed in
making decisions relating to the property resources that support service delivery. Supporting
the PAMP is the Estates Strategy which sets out a high-level overview of the property vision,
objectives, plans, programmes, and projects that are being developed to implement the
strategy. 
This Property Asset Management Plan (PAMP) sets out the North Ayrshire plan for the
management of the Council’s property assets for the period 2023 – 2028. 
2. Aims & Objectives

Page 15

3
 Establishing a corporate framework for the management of all Council property
assets.
 Presenting an overview of the extensive property assets owned by the Council.
 Identifying the internal and external influencing factors and challenges affecting
property.
 Identifying a number of activity themes to improve the performance of property asset
management.
 Outlining priorities for investment in the Council’s property estate.
North Ayrshire Council has established the Council Plan 2023-2028 which contains four
principal objectives necessary to meet our vision and mission statements. Effective and
efficient property asset management is pivotal in achieving these goals, with the key activities
noted as follows:
• Wellbeing
• Communities & Local Democracy
• Climate Change
• A Sustainable Council
The purpose of this PAMP is to support the delivery of the Council Plan and to ensure that
property assets continue to play a pro-active role in the delivery of Council services.
This PAMP supports the delivery of the North Ayrshire priorities by:
Property assets are essential to the services delivered by North Ayrshire Council and
managing these property assets is a structured process that seeks to ensure best value;
continuous improvement in performance; achievement of corporate priorities and service
modernisation.
3. General Description of Assets
The following table summarises the Council’s operational properties within North Ayrshire:
Property Type Uniclass Category Number
Historic Buildings D582 14
NAC Offices (inc. leased-in) D3141, D3142, D3143, D3154,
D325 8
Schools (inc. Early Years stand-alone
assets and ASN schools) D711, D712, D713, D717 59
Community Properties D51, D532, D5322, D5323,
D5341, D754, D762 56
Depots D1264, D173, D1732, D2722,
D2823, D284 23
Commercial (inc. individual units) D283, D284, D345, 223
Sheltered Housing/ Day Care Centres D441, D447, D8141, D8144 32

Page 16

4
North Ayrshire Leisure Limited D541, D562, D563, D567,
D56771, D5685 18
Cemeteries (inc. graveyards/
churchyards) D673 34
Residential Non-HRA D442, D4461, D855 14
Educational Resource Centres D5841, D586, D74 5
Other Sports & Travellers Site D5845 12
Public Conveniences (exc. APC’s) D941, D942 25
Total Property Assets 523
of which, Common Good 7
Table 1 - Property Asset Designations as at August 2023
4. Asset Management Performance and Drivers for Change
For this PAMP to achieve its objectives, the ambition needs to be accompanied by year-on-
year delivery of significant, meaningful, and measurable benefits to the Council and the
residents of North Ayrshire. The Council needs to be capable of demonstrating these benefits
through its own performance measures and to satisfy both external scrutiny and comparison
against external benchmarks.
The performance challenge for the Council in terms of asset management is captured in the
following chart. It embraces external assessment, to meet statutory performance obligations,
and internal challenge in terms of a performance measurement framework. Put simply, the
approach is to assess how well the Council is doing against a clear set of performance criteria
which reflect Council priorities in terms of efficiency, effectiveness and added value.
PMI will ensure that the structure for and disciplines around Corporate Asset Management
Planning are maintained and refreshed annually.

Page 17

5
Data Measures Outcomes
Local Stakeholders
Requirement
Property Performance Challenge
Use of National
property
Management
Performance
Indicators
(NaPPMi)
Developed by NAC
to meet own
specific needs
Performance indicators tailored for different types of property
In relation to key
themes 
Short, medium,
and long term
It is vital to present relevant information in a simple and informative manner to reflect a
property’s performance in supporting service delivery.
The key questions to therefore consider are: -
 What property does the Council have?
 How well is it performing?
 What are the long-term needs?
 How can these be achieved and funded?
In previous years, work has been undertaken to assess the condition and suitability of each
operational property to enable an overall suitability assessment to be undertaken, which in
turn enables informed decisions to be made in relation to future investment requirements.
The latest condition surveys undertaken on key operational properties assessed the condition
of the property assets and highlighted priority investment based upon the design life of
individual elements of the fabric of the property assets. This created a needs-based
prioritisation of investment to inform capital planning.
With regards to key drivers for change, there are a number of emerging constraints which will
impact on the success of the PAMP. These influences include:
 The Council’s commitment to achieve net zero carbon emissions by 2030
Community Surplus Investment Tenanted Office Operational
Optimised
Portfolio
National
Corporate
Objectives Comparisons PAMP
Performance Indicators Theme Platform
Business
Partners
Asset Data
Records
Set and
Monitored by
Strategic
Property Asset
Group
Condition
Cost
Income
Value
Sufficiency
Suitability
User
Utilisation
Sustainability
Accessibility
Efficiency
Effectiveness
Value
Other
Industry
Public Sector

Page 18

6 
 Investment in existing building stock is required to upgrade or replace plant with
more energy efficient and green technology from renewable sources, together with
enhancing building fabric and increasing thermal resistances of current property
assets.
 New projects may rely more on external consultants with specialised knowledge
and experience to deliver buildings which meet the credentials necessary to
achieve net zero, such as Passivhaus. 
 Difficulties attributed to the current economic climate
 Financial pressures undoubtedly have an impact on the way the Council operates,
in particular the maintenance of our property assets which are the main base for
operation of most of our services. 
 Post-pandemic work habits have changed, resulting in less demand for office space
 In the post-pandemic world, agile and hybrid working arrangements are now
commonplace. One factor from this change is the reduction in office
accommodation required, with many buildings becoming under-utilised. 
5. Condition and Suitability
A Condition Survey provides an elemental assessment of the physical condition of a property
and provides an assessment of a building’s:
 Current condition
 Costs to bring up to standard
 Future costs
 Recommendations, concerns, further action 
To facilitate an informed decision-making process, a Condition Survey should result in a clear
understanding of the current condition of operating systems by a client. This indicator
measures the percentage of gross internal floor area of operational accommodation which can
be considered as either:
A. Performing well and operating effectively; or
B. Performing adequately but showing minor deterioration; or
C. Showing major defects and or not operating adequately; or
D. Life expired and or at serious risk of imminent failure. 
PMI employs a dedicated officer who is responsible for undertaking full condition surveys of
our operational properties on a 5-year cyclical basis, with these reviewed and refreshed
annually. This ensures we have the most up to date information possible and have extensive
in-house knowledge of our operational property portfolio. 
Building suitability is defined as:
“The extent to which a property meets the current and future needs of, and contributes
toward improvement of, service delivery”.
Suitability assessments have been carried out for some of the Council’s operational properties.
The Statutory Performance Indicator (SPI) on suitability reflects the number of operational
buildings which are considered to be suitable for their current use. These properties fall into
either category A or B. The work to continue to assess the suitability of council assets will

Page 19

7 
continue under this PAMP to enable fuller benchmarking of the performance of assets as the
Council continues on property rationalisation programme.
In conjunction with ensuring the property is suitable for its current use, the assessment of the
effective utilisation of the Council’s property assets and resources is fundamental in realising
both the Council’s vision and strategic priorities.
The Council's drive to improve efficiency is a key element of its desire to achieve a retained
estate which meets the needs of service delivery and is fit for purpose. This is an essential
element of good asset management practice by identifying utilisation of property assets, the
Council can map current and plan for future demands for property assets.
A key element of these utilisation reviews is the identification of under-utilised property assets,
which will be examined to determine alternative proposals to either maximise utilisation of the
asset, or to provide the service in a different way, thereby enabling the asset to be declared
surplus and offered for disposal. To date, comprehensive utilisation information has only been
collected for the school estate which indicates that there are no establishments where the
school roll exceeds the building capacity, whilst 22% of primary and secondary schools have
rolls less than 60% of their capacity. It is a key factor in both the setting of the Capital Plan
and the rationalisation of the Council’s estate, that where schools have spare capacity, they
assist with the creation of community hubs within school campuses/premises where feasible.
In order to determine the sufficiency of the estate, and where investment may require to be
targeted, calculations are required to be undertaken which take account of planning
applications for housing and assessments of demographic population forecasts.
6. Sufficiency
The emergence of hybrid working through the need for change during pandemic restrictions,
along with advances in technology has revolutionised the working environment. The effect of
staff working from home has led to a substantial decrease in demand for office
accommodation. This downturn in occupancy for many Council buildings has presented an
opportunity to rationalise the estate by consolidation of services.
There is currently a feasibility study underway to review the corporate buildings and propose
solutions to adjust the portfolio to meet the demands of the workforce. It is anticipated that this
study will identify options to streamline the property assets, making for a more efficient estate
and in turn reducing revenue costs as well as potential disposal opportunities leading to capital
receipts.
Good estate management involves the monitoring and review of the portfolio. Any property
assets which may be deemed Surplus, can be considered for disposal, either by way of sale
or transfer. There are a number of benefits achieved from the disposal of a surplus asset: -
 Revenue savings achieved through the removal of property running costs.
 Capital Receipts income from sale of asset.
 Removal of statutory obligations easing pressure on resources
 Reduction in risk management, where some older properties may have latent defects
(such as asbestos, Legionella or ageing plant at risk of breakdown)
 In the case of Community Asset Transfers, the disposal will empower the community
associations who take over the ownership of the building.
 The opportunity to contribute to the Council’s net-zero carbon emissions target by
offloading buildings which may not be particularly efficient. 
7. Financial

Page 20

8
Property Running Costs 22/23
£5,347,000 £5,741,000
£3,424,000
Utilities
Property Maintenance
Property Costs (Rates, Insurance, etc.)
Property Lifecycle Investment Commitments
£3,500,000  
£3,000,000
£2,500,000
£2,000,000
£1,500,000
£1,000,000
£500,000
£0
Budget Actual
The total revenue running costs for the operational estate in 2022/23 was £14.512m, which
consists of all reactive repairs, planned preventative maintenance, statutory compliance,
utilities, rates, insurance premiums, and any other property costs.
Committed revenue investment across the property estate is accompanied by ongoing capital
investment through the Property Lifecycle Investment (PLI) budget. This funding stream
contributes to the maintenance and management of an asset by maximising the life of the
building. Considered investment is directed to properties in need of building fabric upgrade
and plant replacement where required most, and as identified in the cyclical condition surveys.
Since 2016/17, there has been a total investment of £13.583m from PLI funds on operational
buildings, with a further £7.877m anticipated spend by 2030/31.

Page 21

9 
As highlighted in Section 6 – Sufficiency, the disposal of surplus assets may lead to the Council
achieving capital receipt income from the sale. The current Capital Receipts Schedule is
summarised as follows: 
Funding 
Actual
2023/24 
Estimated
2023/24 
Estimated
2024/25 
Estimated
2025/26
Estimated
2026 &
beyond  Total Estimated
GF £0 £2,011,535 £7,640,000 £850,000 £1,705,000 £12,206,535
HRA £575 £25,575 £0 £0 £0 £25,575
Common
Good  £0  £0  £325,000  £0  £0  £325,000
Totals £575 £2,037,110 £7,965,000 £850,000 £1,705,000 £12,557,110 
8. Legislation 
Maintaining a public building requires extensive management and coordination of the various
disciplines required under statutory compliance. This involves recurring service inspections
across many elements of a building, which is coordinated centrally from the Contracts,
Compliance & Maintenance team, and covers the following: - 
 Gas Safety/ Soundness tests
 EICR Fixed Wiring
 FRA renewal
 Fire appliance service/ testing
 Fire detection system testing
 Emergency lighting testing
 CCTV service
 L8 ACoP Legionella (RA, biological sampling, temperature testing, etc.)
 TM44 AC/ AHU servicing
 Passenger lift servicing
 Automatic door serving
 Pressurisation vessel service
 Pool plant servicing
In addition, the service administers work activities in locations where there may be asbestos
containing materials (ACMs) present. Any planned construction work is subject to a pre-check
of the asbestos register to determine any presence of ACMs. If appropriate, a Refurbishment
& Demolition survey is commissioned by a specialist contractor, followed by testing at a UKAS-
approved laboratory. All buildings which have ACMs present and listed in the asbestos register
are subject to regular inspections to ensure the materials have not degraded and at risk or
releasing airborne fibres. All works are in accordance with the Control of Asbestos Regulations
2012. 
9. Health and Safety
The Health and Safety at Work etc. Act 1974 is the overarching legislation which covers
occupational health and safety in Great Britain. In addition, the Health & Safety Executive
publication, HSG159 “Managing Contractors” is guidance which is adhered to by the service
when engaging and controlling contractors.

Page 22

10 
10. Risk Management
The delivery of the PAMP is affected by a number of constraints including finance, statutory
compliance, backlog maintenance and resources.
Finance is the major constraint, as every local authority addresses the impact of reducing
budgets and the need to do more with less. Better and more efficient ways to utilise buildings
through changing working environments, changing the culture of working practices, co-
location of services/teams requires to be balanced against available budgets.
Statutory compliance is a key issue for operational property and this requirement is a
significant element within the Property Maintenance Budget (PMB) each year.
The ability to effectively maintain operational properties is also affected by available funding,
however the condition surveys which are undertaken on operational property assets are used
to assist with the prioritisation of repairs and maintenance to best utilise the available/approved
funding. Going forward we need to ensure we are investing in a planned and preventative
maintenance programme for the whole estate, thus reducing the likelihood of reactive
expenditure.
Risks to delivery of the PAMP
In delivering this PAMP, there are a number of risks which may impact on the effective
execution, and which require to be considered and mitigated. The potential high-level risks
include the following: -
1. Budgets - External factors including high inflation and global market pressures
(availability of materials/ resources) which impact on construction and maintenance
costs, leading to pressures on routine and reactive maintenance and planned
investment.
2. Business Continuity – robust business continuity arrangements are required across
our property estate to deal with potential operational disruption arising from building
maintenance issues.
3. Legislation - Changing legislation may entail new capital projects to deliver new
services which will put pressure on existing capital plan projects and budgets. This
may also affect retained assets which may mean that some assets are no longer fit for
purpose and require unplanned investment to ensure they are compliant and fit for
purpose for continued service delivery.
4. People - Availability of appropriate and sufficiently knowledgeable staff to deliver on
the priorities and agenda within the PAMP.
5. Net-zero carbon emissions – challenging targets will require significant financial
investment within our property estate 
All of the foregoing potential risks require to be considered and through robust governance
procedures as outlined with the PAMP there may be the opportunity to ensure that the risks
can be mitigated or at the very least sufficient controls can be put in place to ensure the overall
success of the delivery of the PAMP.
Project specific risks
Project risks are managed through the standard project documentation and reporting process.
Individual risks and mitigation measures for each project are captured in a risk register.
Significant risks are also captured in the Project Summary Sheets which are reported to ELT
and CPAG on a regular basis.
12. Governance of the assets

Page 23

11
The Council recognises the need to manage its property asset base corporately and has
therefore established a structured approach with clear roles and responsibilities and clarity of
accountability and control.
The diagram below shows the principles of this type of approach of asset management
through integrated corporate ownership:

Page 24

12
&
CPAG
(Capital Programme
Planning Asset
Group)
Developing and
delivering NAC’s
capital investment
programme.
7.2t
Principal communications of
asset management through
integrated corporate ownership
Based on RICS Public Sector Asset Management
Guidelines 2011
Active
involvement with
Strategic Asset
Group
Operational Directorate Asset
Representatives 
Develop
operational plans
with AM function
Corporate
Landlord -
Asset Management
Function
Delivered by PMI.
Supports the
Transformation Board
in coordinating AM
strategically, assists
Directorates in
developing future
accommodation needs.
Executive
Leadership
Team
Corporate Decision-
making body.
NAC Cabinet
Approval of strategic AM decisions
Transformation
Board
Coordinates asset
management
strategically and
recommends to
Executive Leadership
Team.
Team Manager
Assets &
Estates
Responsible for
rationalising the
Council’s
operational estate.
Directorate
Project Boards
Asset
Champion
(Director of
Place)
An asset voice at
management/
executive/member
level.
Health &
Social Care
Partnership
Chief
Executive’s Place Communities
& Education

Page 25

13
Common Good and Trust properties
The Council manages a number of Common Good and Trust properties throughout North
Ayrshire. Where the Council occupies properties for service delivery purposes an appropriate
rental is paid into the Common Good and/or Trust Funds. These Common Good and/or Trust
property assets are held in trust for the benefit of the local population/communities and
comprise a range of asset types including amenity land, historical buildings, offices, sports
pavilions/pitches, public parks and public buildings. Income generated from the leasing of
Common Good/Trust Funds is used to maintain and repair the property assets where required.
Tenants of Common Good/Trust properties have responsibility for internal repairs and
maintenance.
Leased-out commercial estate
The commercial estate comprises 160 assets which includes 94 industrial assets, 41 retail
units, and 25 offices. The commercial and industrial portfolio transferred to the Business
Support and Development team, who manage the properties with the support of an external
property management consultancy firm, Graham + Sibbald.
13. Future Service Delivery Aspirations/ Challenges
In 2022, PMI and the Transformation team embarked on a study to review the use of buildings
across North Ayrshire as part of the Land and Property Transformation Workstream, to identify
opportunities to consolidate and rationalise the estate. The objective is to reduce our property
running costs and future investment requirements, as well as reduce our carbon emissions.
Progress is reported to the Corporate Transformation Board.
14. Performance Indicators
In accordance with good asset management practice, condition surveys have been
undertaken on operational property assets to assist in the planning of the capital and revenue
investment in the Council’s property assets. Whilst the surveys provide a visual assessment
of the condition of the buildings, the PMI Property Assets & Rationalisation team works jointly
with building users to assess the appropriateness of the environment for the intended use and
service delivery. Thus, suitability is measured alongside condition in assisting in developing
informed opinions in relation to whether an asset is considered to be key to service delivery
and should be retained, where investment in the building will either prolong its life or seek to
better utilise the asset to improve its suitability.
The combination of condition and suitability grading for each property enables investment and
performance decisions to be made and all operational properties form part of a future rolling
programme of surveys to ensure this process is better managed to provide the accurate data
required.
16. Action Plan
Action
Plan
Reference
Action Desired Outcome Lead Timescale

Page 26

14
PAMP_A01 Review governance
arrangements
relating to asset
management to
ensure that
strategic asset
management
reflects best
practice.
NAC will have a
property estate
which is being
managed
appropriately and in
accordance with
current guidance.
PMI Mar-24
PAMP_A02 Continue
implementation of
new CAFM system
to replace current
software.
A new CAFM
system will result in
asset management
becoming
integrated in
officers’ daily
duties, making
workload more
efficient, and
providing required
data seamlessly.
PMI Jun-24
PAMP_A03 Review existing
asset management
approach to ensure
information is used
appropriately to
influence
investment
decisions and future
asset management
strategies.
A more robust
process is
established for
identifying
investment
priorities, ensuring
key stakeholders
are included in
strategic decision-
making.
PMI Mar-24
PAMP_A04 Develop
performance
indicators that
reflect a robust
system of financial
management
achieves value for
money.
A set of KPI’s are
formed to highlight
success and
improvement
opportunities.
PMI Mar-24
PAMP_A05 Prepare a detailed
condition survey
programme to
identify sequence
for all future
inspections.
A 5-year cyclical
condition survey
programme is
established,
providing full
transparency for
services and
management, and
ensure all buildings
are attended to in a
timeous manner.
PMI Dec-23
PAMP_A06 Conclude review of
new Insurance
claim process.
An agreed method
for processing all
insurance claims,
PMI /
Insurance
Dec-23

Page 27

15 
reducing delays and
impact on end-user.  
PAMP_A07 Finalise PLI capital
project
commitments for
the upcoming 3
years.
A programme is
created for planned
PLI projects giving
opportunity for
collaborative works
with other teams/
services.
PMI Mar-24
PAMP_A08 Complete a data
cleanse of existing
property asset files
in K2 and update
where required.
Obsolete and
superseded data
entries on the
current CAFM
system is removed,
ensuring the asset
register is accurate
and ready for
transition to a new
system.
PMI Mar-24
PAMP_A09 Ensure fire plans
are present and
correct, in
accordance with
new UFAS
changes.
All fire plans are
accurate (building
layout, fire system
devices, legislation
and guidance
correct) to align with
H&S, FRA and
Insurance
concerns.
PMI Dec-23
PAMP_A10 Complete the
review of all
rationalisation
workstreams
(analysis works)
All opportunities
have been fully
assessed (external
and in-house
reviews), and
outcomes then
available to present
to Transformation
Board.
Transformation
/ PMI
Oct-23
PAMP_A11 Complete the estate
surveys of RAAC
All NAC operational
properties with the
potential to contain
RAAC have been
surveyed and
remedial actions
received.
PMI Sep-23
PAMP_A12 Prepare a strategy
for upgrading the
Council estate to
meet ZDE targets.
Collaborative
exercise with E&S
identifying energy
efficiency actions in
the existing
properties to
Sustainability /
PMI
Ongoing

Page 28

16 
achieve net zero
carbon emissions

Page 29

ASSET MANAGEMENT PLAN
ROADS

Page 30

Page 2 of 42 
‘a strategic approach that identifies the optimal allocation of resources for the management,
operation, preservation, and enhancement of the highway infrastructure to meet the needs of
current and future customers’.
1. Introduction 
This Road Asset Management Plan (RAMP) sets out the Council’s approach for the
management and maintenance of its road assets. 
2. Aims & Objectives 
Road Asset Management 
Road Asset Management is defined in the County Surveyors Framework for Highway Asset
Management as: 
This definition brings together themes that define an asset management approach: - 
Strategic Approach – adopting a strategic approach to maintain and renew the asset and
make best use of available resources for the long-term benefit of the asset. 
Optimal Allocation of Resources – investment is allocated to prioritise the delivery of
corporate objectives and to provide best value to our customers. Asset management provides
a framework for this process by identifying and prioritising needs across the network as a
whole. Lifecycle planning is used to minimise whole life costs to ensure efficient and effective
use of resources. 
Customer Focus – considering the needs and expectations of customers is addressed by
developing appropriate levels of service for each asset. 
Through prudent asset management, North Ayrshire Council will make best use of available
resources in maintaining its road network and associated infrastructure. 
Council Plan 
The importance of asset management is evident in how well managed and maintained road
infrastructure contributes to the Council Plan 2023-28 Priorities: 
Priority – Wellbeing 
• Ensure our places and spaces where we live, work and visit are well maintained and
accessible.
• Developing infrastructure to support business growth. 
Priority – Climate Change 
• Improving resilience and reducing carbon by developing and supporting supply chains
where materials and goods are sourced locally.
• Developing and promoting active travel infrastructure.
• Transitioning to low and zero carbon travel.

Page 31

Page 3 of 42
Priority - A Sustainable Council
• Ensuring robust governance arrangements are in place to fulfil the Council’s statutory
duties, manage risk and support delivery of key priorities.
• Working with partners nationally, regionally and locally to secure investment and target
resources towards our priorities.
• Focusing our investment on priorities
• Effective workforce planning ensuring that we have the right skills/resources to deliver
priorities.
3. General Description
The Council’s adopted road asset is made up of:-
Asset Quantity
(31st March 2023)
Unit
Carriageway – Mainland 883.9 km
Carriageway – Arran 166.3 km
Footways/footpaths 1026.84 km
Bridges & Culverts 630 no.
Car Parks 66 No.
Retaining Walls 116 No.
Street Lighting Columns 24,338 No.
Traffic Signals 81 No. of sets
Vehicle Activated Signs 39 No.
Non-illuminated Signs 12,413 No.
Illuminated Signs/Bollards 2,045 No.
Pedestrian Guardrail 10,750 m
Grit Bins 510 No.
Safety Fences 40,575 m
Street Name Plates 3,673 No.
Cattle Grids 11 No.
Verge Marker Posts 4,465 No.
Weather Stations 2 No.
Asset Management Planning Documentation
The following documents are produced to support the asset management process and are
reviewed and updated regularly:
Road Asset Management Plan – records the service standards for each asset group,
identifies risks, reflects local traffic levels, customer preferences and current investment
strategies.

Page 32

Page 4 of 42 
Data Management Plan – records methods for collection, validating and updating of asset
data and an action plan for improvements regarding estimated or missing data. 
Road Asset Valuation Report – provides information on data used in the valuation, methods
of calculation and interpretation of results. 
Performance Report – APSE/SCOTS results 
Improvement Action Plan – to support the asset management planning process. 
Customer Information Report – provides current customer information 
APSE / SCOTS Customer Questionnaire – help us understand the customer expectations
and experiences of winter gritting, road works and other road maintenance related matters. 
Road Maintenance Manual – defines how and when each asset group is inspected,
categorisation of repairs, condition assessment, prioritisation methods and procurement and
management of works. 
Annual Status Report – provides a summary of the status of each asset group in meeting
service standards. 
Road Risk Register – details of risks to implementation of the plan 
Works Programme – a Strategic List of Priorities is provided from which the annual
programme is determined. 
Other Road Assets
There are a number of road infrastructure assets currently not covered within the RAMP that
require data to be collected to ensure a complete overview of the Councils’ responsibilities. 
♦ Drainage systems are not covered by this plan. There is limited recorded information
on drainage. New drainage installed or existing drainage that is being worked on, is
included in the recording procedures for asset changes. Historic plans of drainage will
ultimately be fully recorded on GIS. This element will form part of the new SCOTS
asset management project. Sustainable Urban Drainage Systems (SuDs) are an
integral part of all new development. Developers are required to install a SuDs as part
of their drainage infrastructure. NAC have signed up to the Memorandum of
Understanding with Scottish Water that states that Scottish Water will be responsible
for the below ground assets and the council will be responsible for the above ground
asset. As part of the construction consent process, NAC have ensured that the above
ground assets are part of the developments factor arrangements. 
♦ Road & Lighting Infrastructure that is not part of the adopted road network is not
currently included within this RAMP. Work has commenced to collect lighting,
carriageway, and footway condition data for Housing areas, and limited information
regarding additional road infrastructure out with the adopted road network has been
recorded. A methodology for the prioritisation of maintenance on these assets is being
developed. Further work is required to ascertain how the financial valuation of these
non-adopted assets should be reported. There is a list of additional assets recorded
within the GIS system as they are highlighted, and further assets will continue to be
added to the list as they are identified. 
♦ Private Roads and Footways – those not on the list of public roads. This also includes
non-adopted council assets, such as promenades, car parks, council properties and
open space paths.

Page 33

Page 5 of 42 
♦ Urban road verges within 30mph zones 
♦ Cycle paths – not forming part of existing carriageways or footways/footpaths 
♦ Private Bridges (including Network Rail and Sustrans structures) 
♦ Roadside Trees that are within the extents of the adopted road network. Trees are
inspected by the Streetscene service when any issues are highlighted by members of
the public or the Roads Inspector. If required, the roads service will serve notice on a
neighbouring landowner to action any problems identified with the tree. 
Flooding Assets 
The Flood Risk Management (Scotland) Act 2009 confers certain powers and places specific
duties on Local Authorities to help them manage flood risk in their areas. Flooding assets
are varied and can include both built and natural features, which are not always located on
Council owned land.
Flood Risk Management assets can be either: 
1. An asset that is subject to Council intervention, which is necessary to reduce the risk
of a flood that is likely to occur imminently and have serious consequences. These
types of assets are only identified in urgent situations and may generally be
maintained by another asset owner at other times.
2. A relevant body of water that has been subject to an assessment, which finds that
clearance and repair work would substantially reduce flood risk; The Schedule of
Clearance and Repair that is published on the Council’s website (available at
https://www.north-ayrshire.gov.uk/Documents/FloodProtection/2019-20-clearance-
and-repair-schedule.pdf) lists the trash screens, watercourses and culverted
watercourses that are regularly cleared and repaired. Note only works that would
substantially reduce flood risk can be undertaken.
3. A formal flood protection scheme. There are Flood Protection Schemes at Largs,
Saltcoats and the Upper Garnock. The standard of protection offered by these
schemes rely on both the maintenance of these assets and on the operation of flood
gates, barriers and other features that are part of the schemes.
4. An asset located on Council owned ground that provides a flood risk management
function. Examples can include built or natural coastal defences, Council owned
drainage infrastructure etc.

Page 34

Page 6 of 42
4. Current Performance / Drivers for Change
Service Standards
The following service standards apply to the road asset and define the level of service that
customers can expect. The standards allow the appropriate prioritisation of resources within
available funding. Details of how the specific measures are calculated are included in the road
maintenance manual.
Service Measure Target Standard
Carriageways
Safety
Response times to Category 1 defects 4 hours (24h on Isle of
Cumbrae)
Response times to Category 2 defects 5 working days
Response times to Category 3 defects 60 working days
Routine safety inspection frequency –
Strategic routes
12 times per year
Routine safety inspection frequency – Main
Distributor routes
12 times per year
Routine safety inspection frequency -
Secondary Distributor routes
12 times per year
Routine safety inspection frequency – Link
roads
4 times per year
Routine safety inspection frequency – all
other routes and car parks
once per year
Utility Inspections
% of Sample A Inspections completed
against number of potential inspections
100%
% of Sample B Inspections completed
against number of potential inspections
100%
% of Sample C Inspections completed
against number of potential inspections
100%
Condition
Maintain RCI 34.8%
Maintain condition of A Class Roads at target
levels
32%
Maintain condition of B Class Roads at target
levels
32%
Maintain condition of C Class Roads at target
levels
42%
Maintain condition of U Class Roads at target
levels
37%
Footways
Safety
Response times to Category 1 defects 4 hours (24h on Isle of
Cumbrae)
Response times to Category 2 defects 5 working days
Response times to Category 3 defects 60 working days
Routine safety inspection frequency –
footways associated with strategic, main and
secondary routes
12 times per year
Routine safety inspection frequency –
footways associated with link roads
4 times per year

Page 35

Page 7 of 42 
Service Measure Target Standard 
Footways 
Routine safety inspection frequency –
Castlepark and Lower Vennel
Twice per year 
Routine safety inspection frequency – all
other footways and footpaths
Once per year
Condition Maintain % of footways requiring
maintenance at current levels
13%
Service Measure Target Standard 
Street Lighting 
Safety % of street lanterns with a valid Electrical
Test Certificate
40% 
Condition
% of lamps restored to working condition
within 7 days
96%
% of lanterns that exceed their Expected
Service Life should be no more than
20%
% of columns that exceed their Expected
Service Life should be no more than
20% 
Structures 
Safety Carry out General Inspections 2 yearly
Carry out Principal Inspections 6 yearly 
Condition
Response time to emergency calls 4 hours
Target figure for Average Bridge Stock
Condition Indicator
86.4
Target figure for Critical Bridge Stock
Indicator
75 
Traffic Signals 
Response time to attend urgent faults 2 hours 
Safety
Repair/make safe time for urgent faults 4 hours
Response and repair time for non-urgent
faults
12 working hours 
Details of our Road Hierarchy are shown in Appendix B 
Road Condition
The table below shows the Road Condition Indicators for North Ayrshire Council reported as
Statutory Performance Indicators and the comparison with the Scottish average. Road
condition improved from 2014 to 2016 as a result of asset management practices using
lifecycle planning to target investment to make optimum use of available resources. Road
condition deteriorated slightly by 1.3% between 2014-16 and 2016-18, additional budget
invested in roads infrastructure in 2017/18 and 2018/19 stabilised road condition and further
additional investment contributed to an overall improvement in road condition. There has been
a marginal deterioration in the % of the road network that should be considered for
maintenance treatment reported in 2023, additional investment in road infrastructure
improvements in 2022/23 and 2023/24 should assist in improving road condition over the
longer term.

Page 36

Page 8 of 42
RCI Comparison to Scottish average
2012-14 2013-15 2014-16 2015-17 2016-18 2017-19 2018-20 2018-21* 2020-22 2021-23
North Ayrshire 40.8 39.1 37.8 38.3 39.1 38.1 37.3 37.1 33.9 34.8
Scottish
average 36.7 37.0 36.7 36.4 36.7 36.3 35.8 35.5 34.2 33.6
Comparison to
Scottish average +4.1% +2.1% +1.1% +1.9% +2.4% +1.8 +1.5 +1.6 -0.3 +1.5
Overall Ranking 21st 20th 20th 22nd 26th 23rd 23rd 23rd 20th 21st
*3 year composite PI due to issues completing survey during Covid19
5. Condition and Suitability
Customer Surveys, Enquiries and Consultation
A Roads Service customer survey was undertaken in 2013. The survey covered customer
contact and levels of satisfaction with various areas of the service – winter service, road
maintenance, street lighting. The surveys identified that although we were delivering a high-
quality service in the works being carried out, the condition of the roads and footways was
perceived to be in decline.
North Ayrshire took part in the National Highways and Transport (NHT) Networks survey in
2016. This survey measures public satisfaction with highways and transport services across
the UK with results shared on the NHT website to encourage benchmarking and drive
improvement.
Contract specific questionnaires are distributed after completion of contracts to properties in
the vicinity of works. These results are recorded on a customer survey database to provide
information for future improvements to be incorporated into Service Delivery.
The Roads Service now participates in the APSE / SCOTS customer satisfaction survey to
enable benchmarking between other Scottish authorities. This is an online survey managed
by APSE that is available to all local authorities to use and it asks a set of standard questions
which are specific to your own council area. This survey is open at all times for members of
the public to access, and available on our website. However, a review of the data collected
indicates that activity is generally as a result of specific social media promotions of the survey
as shown below.

Page 37

Page 9 of 42
The results of the customer satisfaction surveys can be found in the Asset group Status reports
in Section 6 - Sufficiency.
North Ayrshire Council has a procedure in place for recording and dealing with complaints.
Details of general enquiries are recorded in the Verient EMPro System and all reported defects
are recorded in WDM Road Management System (RMS). This information highlights numbers
of specific types of fault or faults occurring in a geographical area.
North Ayrshire Council also has representatives who attend various meetings to ascertain
views and/or requirements – e.g. North Ayrshire Access Panel, Community Groups and Estate
Based Inspections. Responses are also sought via the North Ayrshire Community Planning
Partnership People’s Panel that is comprised of 2000 representatives of the population of
North Ayrshire.
Consultation is undertaken through the Locality Partnerships for local people within
communities; set in North Coast and Cumbrae, Three Towns, Garnock Valley, Arran,
Kilwinning and Irvine. This identifies and addresses local issues, sets out priorities for each
locality and how they can be addressed within a developed Locality Plan.
We work closely with Arran Community Council, Visit Arran and other key stakeholders to
consult on works programmed to be undertaken on the Island of Arran to ensure that disruption
is minimised and that any concerns are addressed.
Public consultation exercises are undertaken prior to final design decisions being made about
major projects – for example, consultation has been carried out across West Kilbride to
consider improvements to traffic management in the town and also in Gateside to agree traffic
calming measures to improve safety. Consultation is also undertaken through local press
releases for traffic orders and proposed road closures. An extensive series of consultations
was held during the development of the Millport Flood Protection Scheme.
Condition
SCOTS BACKLOG MODEL
A study was completed in 2010 using the 2007 and 2008 SRMCS data to determine the effect
of applying different maintenance budgets to the Scottish local public road network. This
concluded that the budget required to return to the position where the carriageway is in a good
state of repair (the Headline Backlog figure) was £1.539bn. The model was re-run using 2009
and 2010 SRMCS data in order to determine the effect of the February 2010 winter weather
resulting in a new figure of £1.729bn, an increase of 12.33%. Analysis of information in 2015
identified that the budget required to remove all carriageway defects in 1 year in North Ayrshire
was £30.9million. The backlog figure was re-calculated again in 2017 and 2019. 2017 figures

Page 38

Page 10 of 42
were further revised based on the 2019 Scotland wide treatment costs to provide a comparison
with the 2019 figures. The 2019 figures are calculated based on a set of Scotland-wide
treatment costs to provide a sound basis for comparison between family groups, although any
comparisons must still be treated with caution as the widths of carriageway used in the
calculations are a combination of actuals and estimates provided by individual authorities.
Due to the impact of inflationary increases in material and contractor costs, the backlog figure
is being recalculated for 2023 using current market costs to provide a more accurate picture
of the extent of the backlog facing local authorities, this figure is not yet available.
Backlog figures for North Ayrshire Council (to be updated in 2023)
Authority
Network
Length
(km) 2017 2017 (Revised
2019 rates)
2019 % Change
2017 - 2019
North Ayrshire
Council 1,036 £31,653,000 £36,194,000 £34,807,000 -3.8%
Scotland 52,737 £1.671 billion £1.919 billion £1.888 billion -1.6%
Utility Activity
Utility activity can have a major effect on the maintenance and management of the road
assets. There are currently no recorded figures to quantify the effect that utility openings have
on the road structure, but it is widely believed that these lead to an increase in defects and
earlier deterioration of the road surface than would otherwise be expected. All statutory
undertakers are responsible for carrying out their own reinstatements and the new fifth edition
of “Specification for the Reinstatement of Openings in Roads” is going to introduce a 6-year
guarantee on these works.
This change was the result of the Office of the Scottish Road Works Commissioner
undertaking a review of the long-term damage that can result from utility activity. This included
a review of the existing 2-year guarantee period, and it was felt appropriate to change this to
a 6 year period, with some minor exceptions.

Page 39

Page 11 of 42
The graph above shows high levels of work for telecoms operators, these are due to the
national rollout of high speed fibre broadband. This has resulted in telecoms poles being
erected in residential areas in addition to an increase in excavations in order that new ducting
can be laid to provide accessibility for all residents.
North Ayrshire Council work closely with utility companies to try to minimise the effects of utility
works on the travelling public and to ensure that, as far as is possible, newly surfaced roads
are not disturbed for a minimum period of 3 years. However, in the event of emergency works
being required or new service connections, the utility companies must be allowed to carry out
their works.
6. Sufficiency (Asset Demand)
There is a constant demand for improved road infrastructure for driving, walking, cycling and
accessibility.
Environmental factors also impact on both deterioration of the road network and the solutions
that can be found to address the challenges of providing a sustainable network for the
travelling public.
Environmental Factors
- Climate change – changeable weather conditions with severe  weather  extremes
becoming more common result in rapid deterioration of the road network. Landslides
undermining roads on Arran have resulted in prolonged closures on both the Ross
Road and at Kildonan within the last 2 years. Further landslides have been reported
in 2023 as a result of heavy rainfall. Further, re-routing of traffic due to prolonged
closures results in heavy vehicles causing damage to alternative roads not constructed
to withstand either the volume or type of traffic.
- Winter weather – harsh winter weather, particularly the extreme low temperatures
becoming more common causes significant damage to road surfaces
- Flooding – flooding is becoming more common due to prolonged periods of intense
rainfall with historical road drainage unable to cope. This further leads to rapid
deterioration on rural roads where there is little or no formal drainage in place.
- Electric Vehicle Charging has introduced a number of new assets within public car
parks to allow members of the public access to charge their vehicles.
- Electric cars are around twice as heavy as standard vehicles and are expected to
cause increased deterioration to road networks, with further deterioration as a result of
the introduction of electric buses and lorries which are significantly heavier
- Materials are constantly under review to see if there are more sustainable and
environmentally friendly products available that meet the required standards. Recycled
materials are considered for use where appropriate.

Page 40

Page 12 of 42
Asset Group Status Reports
The status of the major asset groups that make up the road asset as of April 2023 are
summarised in the following pages: -
Carriageways
The Asset
Statistics
North Ayrshire Council has 1050 km of public road network.
Growth of 0.80% over the last 5 years.
Growth of 14.32 km over the last five years.
Commentary
Predicted growth over the next 5 years
of 0.2% per year.
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 show a decrease in
satisfaction with the maintenance of
our roads. The 2016 NHT survey
indicates the low level of satisfaction
with the condition of our roads.
Customer
Expectations
Overall Satisfaction with Winter Service
30%
This decrease in satisfaction with our
road network is despite an
improvement in overall road condition
and indicates the increasing
expectations of the community.
A roads customer survey created
jointly by APSE/SCOTS to enable
national satisfaction comparison was
made available. It asked, how satisfied
or dissatisfied are you with the
condition of roads, this indicates that
the satisfaction level has now dropped
to 16%.
70%
Satisifed
Dissatisfied
A winter survey carried out in 2013
indicated that 70% of the community
are satisfied with the winter service
provided. The APSE / SCOTS survey
in 2022 shows that the level of
satisfaction with the winter service has
remained the same.
Condition
Road Condition Indicator v
Scottish Average
40.00%
38.00%
36.00%
34.00%
32.00%
30.00%
2017 2018 2019 2020 2021 2022 2023
REPORTED YEAR
SRMCS results in 2017/19 indicate
that 38.1% of our carriageways may
require attention – approximately
400km.
Our RCI has improved with 34.8% of
our road network to be considered for
maintenance in 2023. The Scottish
Average has improved over the same
period to an RCI of 33.6%.
Increased investment in road
maintenance since 2020/21 should
assist in maintaining current
condition.
RCI Scottish Average
% Satisfied with Maintenance of
Roads
50%
40%
30%
20%
10%
0%
RCI

Page 41

Page 13 of 42 
Investment 
Investment
Historical
Historical Investment
£7,000,000
£6,000,000
£5,000,000
£4,000,000
£3,000,000
£2,000,000
£1,000,000
£0 
Financial Year 
These figures include capital and
revenue investment in planned
maintenance works. 
The investment figures include
planned kerbing works (as per
Financial accounting guidelines),
planned patching and works carried
out for external authorities 
The carriageway investment plan
includes £3.8m Capital Investment
and £0.5m Revenue. These
investment levels were set to maintain
steady state in road condition. The
reported steady state figure in 2019
increased to £4.3m. 
Investment in 2023/24 includes £3.8m
Capital Investment and £0.5m
Revenue to maintain current road
condition.  An additional £0.5m
Capital and £1m Revenue funding
was agreed for 2023/24 bringing the
total investment to £5.8m.   
Valuation
(Figures to be
recalculated by
SCOTS in 2023) 
Steady State figure £4.3million (May 2019) 
(Increased from £3.8m in May 2017) 
Cost per year to maintain the current
Road Condition Indicator (RCI). (1) 
Headline backlog figure is £34.8million. (May 2019)  Budget required to remove all defects
in one year. 
Planned
Future Investment 
It is calculated that £11.1million per year is required to
prevent further deterioration across the network. This figure
does not include for increasing materials and construction
costs. 
This figure does not take into
consideration the additional costs
associated with surfacing works on
Arran. Increased costs are estimated
to be 50% for materials and transport.
No distinction is made between capital
or revenue funding. 
Forward Works
Programme 
A forward investment plan has been developed for Arran
using Road Condition data and Inspectors surveys which
also takes account of identified community priorities to
provide options for optimising investment. A 3 year plan for
the Mainland is currently being revised due to changes to the
plan as a result of rapid deterioration in some areas. 
Locations identified are subject to
annual re-assessment. Our system is
utilised to identify the optimum
strategy for long term planning for road
maintenance which maximises budget
efficiency for both Arran and the
Mainland. 
(1) The Steady State calculation is based on investment required to ensure carriageways currently in amber condition do
not deteriorate to red condition, and carriageways currently in good condition do not deteriorate to requiring maintenance
treatment. This figure does not include treating all carriageways currently requiring major maintenance works as those in red
condition will not deteriorate further

Page 42

Page 14 of 42
Footways Statistics Commentary
The Asset
North Ayrshire Council has 1014.8 km of footway/footpath
network.
Growth of 1.6% over the last 5 years.
An extra 17.1 km of footway to be maintained.
Predicted growth over the next 5
years of 0.15% per year.
Predicted increase in footway length
of 7.5 km over the next 5 years.
% Satisfied with
Footway/Footpath Surfaces
Good Cycle
FacilitieRsoads being
Good Street 9% in good
Lighting condition
21% 24%
Good Safe Roads
Pavements 24%
22%
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 show a decrease in
70%
60%
50%
40% 30%
satisfaction  with  the  maintenance of
footways and footpaths. The NHT
survey indicates that this increased to
54% of respondents satisfied with the
condition    of    footways.    From  the
20%10%
0%
APSE/SCOTS survey in 2022 we saw
a decrease to 46%.
Footways are third only to safe roads
and good road condition as the most
important assets to our customers.
Customer Expectations
A condition survey of the whole
% footway requiring treatment footway is completed annually.
Assessments  are  undertaken  by the
20.00% Road Inspectors as part of their
15.00% inspection programme.
Condition 10.00% Condition assessments carried out on
5.00% the   footway   network   indicate   that
footway condition is around 12% of our
0.00% footway/footpath network is currently
in need of maintenance treatment –
approximately 122km.

Page 43

Page 15 of 42
Investment Historical
Historical Investment
£700,000
£600,000
£500,000
£400,000
£300,000
£200,000
£100,000
£0
Financial Year
Planned footway maintenance
includes footway resurfacing/
reconstruction and planned footway
patching.
Additional investment in 2016/17 was
as a result of capital investment in
town centre regeneration projects,
however remaining years have stayed
relatively stable.
It is expected that footway condition
will continue to stay static around 12%
unless the level of investment is
increased.
Planned
Future Investment
It is calculated that £1 million per year is required to prevent
further deterioration in the footway network. This figure does
not include for increasing materials and construction costs.
This figure does not take into
consideration the additional costs
associated with surfacing works on
Arran. Increased costs are estimated
to be 36% for materials and transport.
No distinction is made between capital
or major revenue funding.
Forward Works
Programme
All footways requiring maintenance treatment are assessed
according to our priority assessment matrix. This lists all
footways requiring maintenance works in order of priority.
Locations identified are subject to
continual re-assessment.
Investment

Page 44

Page 16 of 42
Structures Statistics Commentary
The Asset
The Structures asset consists of:
249 Road Bridges
88 Footbridges
116 Retaining Walls
293 Culverts
7 Underpasses
1 Tunnel
34 Revetments
The figure for the length of retaining
walls is estimated.
There are two flood protection
schemes currently being progressed -
Upper Garnock Valley, Largs Seawall
and Millport which will involve the
creation of a dam and rock armour sea
defences.
Customer Expectations 100% of requests relating to abnormal loads are responded
to within service response times.
There have been no adverse
comments in respect of Structures.
Condition
Bridge Condition Indicators
95
90
85
80
75
70
BSCIcrit BSCIav
The Bridge Condition Indicators
require that Principal Inspections (PIs)
are undertaken over a 6 year cycle. A
combination of a backlog of PIs and
limited capital investment has resulted
in a deterioration of bridge condition.
Capital investment from 2016/17
onwards has seen the rate of decline
reduce in BSCIs.
General Inspections (GIs) are
undertaken 2 yearly.
Investment Historical
Historical Investment
£1,400,000
£1,200,000
£1,000,000
£800,000
£600,000
£400,000
£200,000
£0
These figures represent revenue
expenditure only from 2013/14 to
2015/16. The application of asset
management to maintenance of the
structures asset resulted in planned
Capital investment of £560,000
annually for maintenance of Structures
assets from 2016/17 util 2022/23.
Further additional Capital investment
of £300,000 was made in 2018/19 to
carry out improvement works.
Financial Year
Investment

Page 45

Page 17 of 42
Planned
Future Investment
Estimated Outstanding Maintenance Work Required
Scour
Protection
5%
Parapet
Upgrades
32%
Road
Bridge
Replaceme
nt/Strengt
hening
37%
Footbridge
Culvert Replacement/
Replacement/ Strengthening
Strengthening 24% 2%
Value of outstanding maintenance
work for the Structures asset is
estimated to be £6.7million.
This estimate is based on the
inspections that have been carried out
to date and may rise as inspections
are reviewed.
A formalised process for establishing
the ongoing, long-term budgetary
requirements for the maintenance of
the Structures Asset, is being
developed to build upon existing
Capital Programme Asset Group
(CPAG) work.
Forward Works
Programme
The capital programme is identified based on the structures
prioritisation methodology which ranks assets based on a
number of factors including condition, safety, and usage.
The revenue programme is based on
priorities from identified maintenance
work, this is adapted throughout the
year due to defects of a higher priority
being identified through the annual
inspection process.
All works are subject to continual re-
assessment. The capital programme
may be revised as a result of higher
priorities being identified through
results of inspections.

Page 46

Page 18 of 42 
Lighting Statistics Commentary 
The Asset 
No. of luminaires 24,448
No. of columns 24,338 
Over the last 3 years the no. of luminaires has increased
by 821 reflecting a rise of 3.4% per annum and the no. of
lighting columns has increased by 1002; a rise of 4.1%. 
The growth pattern is expected to
remain constant due to additional
infrastructure as part of new
developments. In addition,
infrastructure replacement works will
continue to increase the number of
lighting points to reflect current design
spacings. 
Customer Expectations 
% Satisfied with Street Lighting
Provision
100%
80%
60%
40%
20%
0% 
Customer Enquiries and Service Requests 
Roads
Lighting 51% 49% 
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 indicated an increase in
satisfaction with the provision of street
lighting. The NHT survey shows a
decrease in the level of satisfaction
with street lighting. 
The lower level of satisfaction may be
due to the introduction of LED lighting
which is being installed across North
Ayrshire as part of an energy efficiency
programme. These ensure that the
lighting is concentrated onto the road
network thereby reducing light spread
onto surrounding private areas,
gardens and pathways. 
The APSE/SCOTS survey now shows
that the level of satisfaction for street
lighting has remained the same as the
2016 survey at 72%. 
In 2017/18, 49% of enquiries and
service requests recorded for the
Service were regarding Street
Lighting. This is an increase of 8%
over the last 2 years. This may
partially be a result of public reaction
to the changed perception of lighting
levels from the installation of LED
lighting, but is also partially resulting
from policy decision to remove night-
time fault inspection arising from
longer life LEDs.

Page 47

Page 19 of 42
Condition
Columns & Lanterns exceeding
expected service lives
6000  
5000
4000  
3000
2000
1000
0
Financial Year
Columns Lanterns
The number of lanterns exceeding
expected service life has decreased by
55% since 2013/14, due largely to bulk
LED lantern changes despite
fluctuations in Capital investment.
The increase in the number of columns
exceeding service life may have been
affected by estimated historic
installation date records and will also
be affected by reprofiled capital
investment in the years 2019-21. The
age profile of lighting assets is variable
dependent on original development or
bulk spend and over years can
account for differences in age expired
units. Overall the profile is managed
through use of structural safety
inspections which allow targeted
replacement and budget setting to
maintain at least a static depreciation.
A SCOTS exercise to further refine the
life expectancy of L.A. cable network is
ongoing
Investment Historical
Historical Investment
£3,000,000
£2,500,000
£2,000,000
£1,500,000
£1,000,000
£500,000
£0
Financial Year
Level of historic investment reflected
the ongoing £1m approx. required
annually to maintain existing lighting
infrastructure depreciation. Reprofiled
Capital in 19/20 resulted in reduced
investment to £750k. This has been
restored in later years.
An increase in investment from
2014/15 to 2017/18 is due to a major
spend to save energy initiative to
introduce LED lanterns into approx.
60% of the network. This resulted in an
energy efficiency saving of an
estimated £570k per year. However,
reduction in energy and carbon has
been offset by significant increased
energy costs since 2022.
Planned
Future Investment
Forward Works
Programme
Capital Investment
2015/16 - £2,654,000
2016/17 - £2,222,000
2017/18 - £1,460,428
2018/19 - £1,000,000
2019/20 - £750,000
2020/21 - £750,000
2021/22 - £1,940,000
2022/23 - £1,250,000
Structural inspection programme of risk certification is
ongoing.
Priority major infrastructure replacement programme is
drawn from inspection, age profile and asset profile
information.
The additional spend to save
investment was completed in 2017/18
reducing investment thereafter to the
ongoing £1M approx. annual
investment to maintain the lighting
infrastructure depreciation at status
quo. However, reprofiled investment
over financial years 2019 – 2021
impacted these statistics with an
increase in units exceeding life
expectancy. There was also a further
identification of £690k energy
efficiency funding in 21/22 for earlier
installed white lighting units to be
converted to LED.
Continued structural inspection
manages risk between priority
replacement and interim inspection
certification.
Investment
Number

Page 48

Page 20 of 42
7. Financial
Historical Expenditure
Historical expenditure on the Road Asset over the last 5 years is shown in the table below:
Asset Works 18/19
£
19/20
£
20/21
£
21/22
£
22/23
£
Carriageways
Reactive 1,210,964 1,087,364 885,282 987,755 637,259
Routine 371,277 262,830 224,136 184,966 280,516
1Planned 4,568,828 3,821,785 4,047,703 5,642,824 5,205,937
Footways Planned 272,982 4409,610 4528,053 4538,415 4530,857
Winter
Maintenance
CW and
FW 685,632 481,195 611,076 452,926 493,955
Structures Total 2950,153 267,054 623,258 1,102,570 1,068,433
Lighting
(excluding
energy costs)
Cyclic 47,316
31,084,258 1,125,450 1,346,570 Figures not
available Reactive 211,482
Planned 1,026,793
1Planned carriageway expenditure includes externally funded improvement works and additional
allocated budget
2Additional Capital investment allocated for Structures planned improvement works from 18/19 onwards
3Total spend as internal works claims are not broken down into work types.
4Revenue footway budget remains at £250k, externally funded improvements, generally on shared
paths, have increased investment on the footway network. In addition, footway improvements are being
included as part of capital carriageway resurfacing projects
Expenditure on street furniture and traffic management systems have been excluded from
these figures as maintenance is based upon ongoing inspection regimes which determine
repairs/replacements to be carried out on a needs basis.
Planned Investment
Service standard targets and investment strategies are based on available budgets detailed
in the table below. Any changes to these predicted budget levels will require changes to both
service standard targets and investment programmes. These budget figures are based on a
10 year plan and can vary annually depending on grant funding and further budget allocations.
Due to internal payment management systems with internal service providers, it is not possible
to break down lighting costs to equivalent figures for cyclic, reactive and planned work types.
The breakdown shown for long term funding reflects the annual capital grant and revenue
budgets for the lighting service broken down to an estimated split.

Page 49

Page 21 of 42
Asset Works £’000 Long Term
Funding £’000
2020/21 2021/22 2022/23 Y4-Y10 pa
Carriageways Reactive/Routine £1,100 £1,100 £1,100 £1,100
Planned £3,800 £3,800 £3,800 £3,800
Footways Reactive/Routine £130 £130 £130 £130
Planned £250 £250 £250 £250
Structures Reactive £135 £135 £135 £135
Planned £560 £560 £560 £560
Street Lighting Energy Costs £643 £678 £693 Based on current
energy supplier
prices. Long term
market prices are
unpredictable
Cyclic £47
Not Available
£100
Reactive £289 £350
Planned £1,027 £800
Investment Strategies
The strategies in this section have been determined using predictions of future condition over
a 10-year period. The predictions enable strategies to be created to look at the whole life cost
of maintaining the asset. Using long term predictions means that decisions about funding
levels can be taken with due consideration of the future maintenance funding liabilities that
are being created. Investment strategies for the major asset types are summarised below.
These strategies are designed to enable the service standards in section 5 to be delivered.
Investment between Asset Types
In comparison to historical investment future investment is planned to be:
− Carriageways: level of investment - £3.8m Capital investment planned annually, expected to
be maintained until 2025-26. Revenue contribution to planned investment expected to be
maintained at £500,000. These figures meet the current steady state figure calculated by
SCOTS to maintain existing road condition. Investment in 2023/24 includes £3.8m Capital
Investment and £0.5m Revenue to maintain current road condition.  An additional £0.5m
Capital and £1m Revenue funding was agreed for 2023/24 bringing the total investment to
£5.8m.  This level of investment should help to counter inflationary increases in contractor
and material costs and assist in maintaining levels of improvement in road condition.
− Footways: level of planned investment decreased to £250k to assist in maintaining
carriageway investment levels, grant funding for active travel and footway improvements as
part of capital carriageway works have increased the level of investment annually in the
footway asset.
− Structures: level of investment increased from 2016/17 to enable a programme of
improvements. Additional Capital investment of £300,000 was granted in 2018/19. Investment
of £560,000 is expected to remain steady going forward.
− Street lighting; level of investment was increased until 2017/18 as part of a ‘spend to save’
initiative to introduce modern efficient LED lighting. Capital investment of £1M annually

Page 50

Page 22 of 42
required to keep pace with annualised depreciation, was reduced in 2019/20 and 2020/21 to
£750k before reprofiled increase in subsequent two years. The immediate impact of this was

Page 51

Page 23 of 42
an increase in depreciated assets which resulted in reprofiling to £1.25m in the following two
years which should stabilise the annual depreciation figures by 2024/25.
Carriageways
The investment strategy for carriageways is to optimise investment by using life cycle planning
to undertake targeted improvements to ensure that efficiency of spend is maximised. This will
increase investment in lower cost treatments, although investment will also require to continue
in higher cost resurfacing where carriageways are in poor condition. The budget available is
insufficient to undertake a full preventative programme as there are areas of major
deterioration that must be addressed for public safety. The strategy is to minimise
deterioration by optimising available investment in order to maintain current condition.
The above illustration shows that by applying road asset management principles the whole
life cost of maintaining the asset is greatly reduced. The use of preventative maintenance
treatments at the optimum intervention timings extends the life of the asset leading to less
need for reactive and planned maintenance.
The budget currently allocated for planned maintenance is to meet the steady state figure
calculated by SCOTS to assist in maintaining current road condition as measured by the Road
Condition Index. This figure is being recalculated to take into account inflationary increases
in construction costs and is expected to be available late 2023. A programme of carriageway
screeding is planned annually to improve our rural road network.
A method of prioritisation is utilised in addition to Scottish Road Maintenance Condition survey
data to target investment for long term planning. Carriageway prioritisation data is included at
Appendix C.
Footways
The strategy for planned improvement works to footway is to develop a long-term programme
for footway improvements using our prioritisation matrix (Appendix D).

Page 52

Page 24 of 42
Preventative treatments have been used in previous years in residential streets but had poor
feedback from the public. As a result of this, all town centre footways are resurfaced in asphalt
with white limestone chips or to meet public realm requirements, but all other footways are
now resurfaced with a 6 or 10mm asphalt concrete finish as this is a more efficient use of
limited funding for footway improvements. Although initial feedback has been varied on this
matter, it is more acceptable to our residents than the extended use of thin surfacing
treatments.
To move to programming investment in our footway network using lifecycle planning, there is
a requirement to use a range of treatments. As thin surfacing treatments are further
developed, they will be trialled, and the results analysed to enable lifecycle planning to be fully
implemented and investment optimised across our footway network.
Routine and reactive repairs are expected to continue at current levels and will be undertaken
within available budgets.
Structures
The structures maintenance strategy is to use available funding to ensure the safety of the
travelling public by maintaining the structures in a serviceable condition. The methodology
used to allocate Revenue and Capital funding is outlined below.
Revenue
Works carried out under the revenue budget are generally reactive and routine works identified
through the inspection regime and/or reported defects from the public.
Works identified, where there is insufficient budget to immediately carry out repairs and where
they are not prioritised due to safety reasons, are recorded in the Work Bank which is a list of
works to be completed as funding is available.
The maintenance strategy attempts to balance the need to complete essential reactive works,
whilst allocating funds to routine preventative and corrective works identified through
inspections. A reduction in routine maintenance will accelerate the rate of deterioration of the
asset.
Capital
A capital budget has been allocated to the structures asset from 2016/17. This is enabling a
programme of strengthening and replacement to be put in place.
These works will be prioritised using the structures prioritisation methodology and a
programme of works established. The Structures Prioritisation Matrix is contained in Appendix
E.
The annual capital budget allocated is £560,000. This means that the current list of works
required would take approximately 12 years to compete.
Street Lighting
The investment strategy for lighting is to continue to use lifecycle planning to undertake
targeted improvements of the overall asset infrastructure by using the prioritisation of profiled
deteriorated, age expired and energy improvement opportunities. This is to ensure that the
asset remains safe and fit for purpose and avoids collapse and injury, such as that
experienced in 2023 in Glasgow.

Page 53

Page 25 of 42 
The funding available currently for infrastructure replacement will not be sufficient to improve
the age/condition profiles, however the overall strategy is to minimise further deterioration of
the asset profile by keeping pace with annualised depreciation. 
However, the short term reduced Capital investment resulting from reprofiling will increase the
annualised depreciation cost; increase poor condition assessment statistics; increase the
impact of energy increases, carbon tariffs and unplanned reactive repairs on future revenue
budgets until the balance is redressed from increased spend in subsequent years. 
The Capital funding will continue to be required to support annual replacement of deteriorated
support column and cable infrastructure on those locations which have been converted to
energy savings lanterns, as those supporting networks themselves become deteriorated and
age expired. 
8. Legislation
Legislation can lead to increased demand on Local Authorities’ resources in managing their
road assets. The following list is legislation requirements currently in place that have an impact
on the Road Service and should be taken account of: 
- Roads (Scotland) Act 1984
- New Roads and Street Works Act 1991
- Transport (Scotland) Act 2005
- Transport (Scotland) Act 2019
- Flood Risk Management (Scotland) Act 2009
- Disabled Persons Parking Places (Scotland) 2009
- Traffic Signs Regulations and General Directions 2016
- Reform of red diesel and other rebated fuels entitlement
- Public Health etc. (Scotland) Act 2008 (Artificial Light Nuisance)
- Electricity at Work Regulations 1989
- Environmental Protection Act 1990
- Clean Neighbourhoods and Environmental Act 2005
- Climate Change (Scotland) Act 2009 
As well as the above primary legislation, there are also secondary legislations, these are
Regulations and Orders that are made under the enabling powers provided by primary
legislation in order to implement and administer the requirements of that primary legislation.
- The Road Works (Reinstatement Quality Plans, Qualifications of Supervisors and
Operative and Miscellaneous Amendments) (Scotland) Regulations 2023
- The Scottish Road Works Register (Prescribed Fees) Regulations 2022
- The Scottish Road Works Commissioner (Imposition of Penalties) Regulations 2022
- The Road Works (Qualifications of Operatives and Supervisors) (Scotland)
Amendment Regulations 2019
- The Road Works (Inspection Fees)(Scotland) Amendment Regulations 2014 
The following national policies and guidance documents also have an impact on the service
provided:
- Well-Managed Highway Infrastructure: A Code of Practice
- Safety at Street Works and Road Works: A Code of Practice
- Designing Streets Manual for Scotland
- SCOTS National Roads Development Guide

Page 54

Page 26 of 42
- SUDS Section 7 agreements may create further maintenance responsibilities in
relation to sustainable drainage systems. Section 7 agreements state that the Roads
Authority and Scottish Water may agree to the provision, management and
maintenance or use of their sewers or road drains for the conveyance of water bringing
shared responsibilities for systems.
- Cycling by Design
- BS 7671:2018 The Requirements for Electrical Installations
- BS 5489-1-2020 Design of Road Lighting : Code of Practice
9. Policy/Guidance
The following policies associated with the Roads asset have been approved by the Council
Members:
- Council Plan
- Performance Management Framework
- Corporate Procurement Strategy
- Place Directorate Plan
- Roads Operational Plan
- Road Asset Management Plan
- Permission for Attachment of Amenity Displays
- Arran Lighting Policy
- Lighting Energy Efficiency Strategy
- Local Transport Strategy
- Winter Service and Weather Emergencies Plan
- Road Asset Safety Inspection Policy
Guidance
- Well Managed Highway Infrastructure - Code of Practice
- BS 5489-1-2020 Design of Road Lighting – Code of Practice
10. Health and Safety
The assets are managed in accordance with Well Managed Highway Infrastructure – A Code
of Practice. The code highlights a statutory obligation on Highway Authorities to maintain the
public highway and embraces the 2 essential functions of Safe for Use and Fit for Purpose.
- Safe for Use requires carriageways to be managed in such a way that they do not pose
an unacceptable risk to public safety.
- Fit for Purpose requires carriageways to be managed in such a way that they remain
available for use by traffic permitted for the route.
Road Safety information and details of initiatives to promote road safety are available
from I:\All Departments\SCOTS Asset Management Project\Road Safety.
Structures assets are managed in accordance with the Code of Practice for
Management of Highway Structures. The code highlights a statutory obligation on
Highway Authorities to maintain the public highway and embraces the 2 essential
functions of Safe for Use and Fit for Purpose.

Page 55

Page 27 of 42 
- Safe for Use requires a highway structure to be managed in such a way that they
do not pose an unacceptable risk to public safety. 
- Fit for Purpose requires a highway structure to be managed in such a way that they
remain available for use by traffic permitted for the route. 
Regular inspections of structures identify problem areas that require urgent rectification or
the imposition of other safety measures such as the implementation and enforcement of
weight or height restrictions. 
The lighting assets are managed in accordance with Well Managed Highway Infrastructure
– A Code of Practice The code highlights a statutory obligation on Highway Authorities to
maintain the lighting asset and embraces the 2 essential functions of Safe for Use and Fit for
Purpose. 
- Safe for Use requires lighting plant to be structurally & electrically safe. 
- Fit for Purpose requires lighting to be operational or to restore inoperative lighting within a
defined time. 
The lighting levels and outputs are defined within British Standard BS5489-1:2020 A Code of
Practice for the Design of Road Lighting and within the ILP Guidance Note 01/21: The
Reduction of Obtrusive Light (JM) and are based on type of road and night-time use of road,
environmental area and whether an alternative lit route is available. 
Works carried out which involve traffic management, excavation or working at height are
progressed in accordance with the legislative framework provided within.
- The New Roads and Street Works Act 1991
- The Working at Height Regulations
- The Electricity at Work Regulations 1989 
Overarching requirements in respect of climate change are managed with respect to Climate
Change (Scotland) Act 2009. 
11. Risk Management 
This section summarises how the council’s risk management strategy is applied to the
management of the road asset. It identifies where risks associated with the road asset are
recorded, identifies the major risks associated with the asset and outlines how they are
currently being controlled. 
Corporate Risk Management Strategy
The Corporate Risk Management Strategy provides a framework through which risk can be
identified and managed, thereby reducing the Council’s exposure to loss. 
Risk Identification
The Roads management team identifies significant strategic risks impacting upon the priorities
outlined in the Councils Plans. 
Risk Categorisation
A risk assessment matrix is used to identify the level of risk associated with carriageway and
footway defects and to categorise and prioritise repairs accordingly. There is a long-
established process in place to risk assess and prioritise defects related to structures.

Page 56

Page 28 of 42 
Risk Control 
Risks within the Roads Service are controlled by carrying out inspections in accordance with
Codes of Practice, adherence to the winter policy and compliance with the Flood Risk
Strategy. 
Monitoring and Reporting 
Risk is continually monitored by the Roads management team and reported to the Corporate
Management Team through quarterly performance reports and annually through the Roads
Operational Plan. 
Risk Register 
A corporate risk register has been produced and this contains the risks associated with
Neighbourhood Services. A summary of the risks associated with the Roads Service are
recorded in the following table: 
Risk Strategic / Corporate /
Operational
Climate Change Operational
Financial Variation on Flood Scheme Operational
Flood Programme Risk Operational
Energy Pricing Corporate
Sustainability of Asset Management
Model (Capital Investment)
Operational
Decriminalised Parking / Legislative
Changes
Operational
Workforce Demographics /
Contingency Capacity Risk
Operational
Recruitment / Retention Corporate
Reputation Risk Corporate
Fuel Resilience Operational 
Specific risks associated with the Roads asset are recorded in the following table: 
Risk Controls Monitoring Process
Reduced resources
leading to a
reduction in levels of
service and an
increase in
complaints and legal
claims
Road Asset Inspection
Policy 
Prioritisation scheme
for works
Regular monitoring of
performance
achievable with
allocated resources 
Number of 3rd party
liability claims 
Number of defects
reported

Page 57

Page 29 of 42
Risk Controls Monitoring Process
Failure of street
lighting electrical
networks leading to
dark area or
electrical accidents
or injury
Statutory Inspection
Regime
Number of units with
valid electrical
inspection
Failure of street
lights leading to
accidents
Regular inspection
programme in place
and investment in
replacement
programme
Number of reported
dark lamps
Failure of street
lighting structures
leading to damage
or injury
Regular inspection
programme in place
and investment in
replacement
programme.
Number of age expired
units with valid
structural inspection
certification
Flooding leading to
service and local
transport disruption
and associated
financial cost
Emergency plans for
flooding
Flood Risk Strategy
Regular inspection of
trash screens and
culverts
Severe winter
weather or failure of
proactive winter
procedures leading
to traffic disruption
and impact on the
local economy
Annual review of winter
maintenance policy.
Operative training in
winter procedures
% of priority routes
completed on time
Ongoing review of
measures in place
throughout the winter
period.
12. Governance of the Assets
Plan Management
The Head of Neighbourhood Services is responsible for management and control of the plan,
and the Senior Managers (Roads and Engineering Services) are responsible for its
implementation.
This Roads Asset Management Plan (RAMP) will be presented to Members as a component
of the overall Corporate Asset Management Plan.
Plan Review
The plan will be reviewed annually as part of the Council’s service planning and budget setting
exercise and in response to planned changes within the delivery of Council services.

Page 58

Page 30 of 42
13. Service Delivery Aspirations/Challenges
The roads infrastructure asset is constantly changing as a result of changes in legislation,
active travel improvements, public transport infrastructure improvements, the introduction of
electric vehicles charging points, requirements for traffic calming measures, and to meet
community aspirations.
Asset Growth
In addition to the above reasons for asset growth, this also arises from the adoption of new
development sites.
The carriageway asset has increased by 1.17% over the last 5 years, which has resulted in
an additional 12.2 km of carriageway to be inspected and maintained. This increase included
an additional 3.56km from the de-trunking of the A737 through Dalry. Due to the increase in
new housing developments, it is expected that the carriageway asset growth will increase at
approximately 0.4% per year. Growth of our footways/footpaths over the same period was
10.9 km representing a 1.08% increase over the same 5-year period, this is expected to
decrease by 0.2% per year due to the increased use of shared surfaces and the resultant
decrease in footway provision.
The number of lighting columns has increased by approximately 0.22% over the last 5 years.
This rate of growth is due both to adoption of new development sites and increased numbers
resulting from improvement of lighting to current standards. This trend is expected to continue.
The number of traffic signals remains relatively static with any increases due to a requirement
to regulate traffic flow on busy routes and to provide safe crossing points for the public. A
number of driver feedback signs are provided, all of which have been installed in the last 8
years.
New infrastructure that isn’t going to form part of the public road network and appear in the
List of Public Roads is classified as non-adopted assets. These mostly consist of new
cycleways and remote paths. These are not recorded as part of the adopted network assets
but do increase the inspection and maintenance liability of the service.
Flooding has seen a significant capital investment in recent years and this has resulted in
several large scale flood prevention schemes, namely, Largs Seawall, Garnock Flood
Prevention scheme and Millport Flood Prevention.
Increasing demand for speed reduction measures is likely to continue, particularly as a result
of the ongoing assessment of 20mph limits for residential streets as part of the Scottish
Governments National Strategy to ensure all appropriate roads in built up areas have a speed
limit of 20mph by 2025. The installation of traffic calming measures and associated signage
further incurs additional maintenance costs.
Traffic Growth
Demand for traffic management measures and parking availability as a result of increased car
ownership has resulted in an increasing number of enquiries and requests for the service to
‘do something’ to alleviate the problem. It is hoped that improvements in public transport, and
cycling/walking facilities will encourage active travel and have an impact on the level of
demand on the road infrastructure.
Traffic movements are also affected by roadworks and changes to the trunk road network
resulting in increased loading on carriageways not designed for high levels of traffic. A shift

Page 59

Page 31 of 42
in local traffic patterns took place with the opening of the 3 Towns by-pass in 2005 and again
with the opening of the new Dalry Bypass in April 2020. The opening of the 3 Towns bypass
resulted in significant deterioration of the B714 as a result of increased traffic volumes, partly
due to drivers choosing to use the B714 as an alternative route when traffic management is in
place in Kilwinning. It is anticipated there will be another change in future years when the
realignment and improvements on the B714 are complete.
With the proposed B714 improvement works it is expected that there will be an increase of
traffic through Kilwinning while works are being undertaken, however this should only be a
temporary situation while the public find alternative routes to avoid the construction work.
Road Equivalent Tariff (RET) was introduced on ferry routes to Arran with a reduction in fares
for the travelling public. There is currently no information available on any increase in vehicular
traffic as a result of this however, anecdotal information suggests a significant increase due to
the influx of tourists, with private cars and bus tours throughout the summer months further
contributing to the deterioration of Arran’s roads. There are projected figures for increases in
timber transport calculated from predicted volumes of timber to be felled in future years. It is
estimated that haulage traffic had increased by 39% between 2012-2016 and 2017-2021, the
demands placed on the road network by timber haulage is expected to continue.
Traffic Composition
Traffic composition is considered where deterioration in the road surface requires repeated
maintenance.
There are a number of rural routes where constant maintenance is required due to heavy
traffic causing damage to roads of sub-standard construction. A survey undertaken on a
number of our C class routes established actual volumes of heavy traffic. It was determined
that the C80 (Whiskey Bond Road) experienced the highest volume at 27% HGV traffic,
compared to the other surveyed routes that had an average of 2%. High volumes of buses
and lorries were also noted on the C118 Routenburn Road (27%) and C41 Brisbane Glen
Road (20%) compared to an average of 16% over the 8 surveyed routes. Cars and light goods
vehicles accounted for only 55% of the vehicular traffic using the C80. This study highlighted
the need to determine appropriate treatment options for these routes to consider the type and
volume of traffic using them; or to look at alternative routes, if possible, for this traffic.
A programme of improvements to rural roads is ongoing to provide for more permanent
solutions to maintaining the road surfaces.
Rural roads are not designed or in a state to be used by heavy goods or large numbers of
vehicles. The C87 from Whitehurst Park to the A737 is a short cut used by residents and
haulage firms trying to avoid going through Kilwinning town centre. This has resulted in this
road requiring significant maintenance, further measures are being considered to reduce the
level of traffic choosing to take this rural route.

Page 60

Page 32 of 42
14. How assets will be used in the future
Local Transport Strategy
The Local Transport Strategy is currently under review and the updated document will help
improve the transport network in North Ayrshire and its connectivity beyond to create an
attractive place for businesses and communities to thrive. The new draft Local Transport &
Active Travel Strategy sets out the policies to be adopted and the actions to be implemented
to guide the planning and improvement of the local transport and active travel networks. It also
outlines behaviour change initiatives aimed at supporting and encouraging people to use the
sustainable transport networks more often. A detailed action plan identifies actions and
priorities for the period of the strategy. The new draft Local Transport & Active Travel Strategy
refers to all types of transport, including walking, wheeling, cycling, bus, rail, ferry and car and
considers how to integrate these types of transport to make travel by several modes easier for
all. The Local Transport Strategy may result in additional public transport and walking/cycling
routes that will result in increasing future maintenance costs.
North Ayrshire Council is committed to implementing low maintenance solutions, where
possible, for example widening existing footways to create shared footway/cycleways rather
than constructing separate new cycleways that would incur additional inspections costs.

Page 61

Page 33 of 42 
15. Performance Indicators 
The table below shows some of the main APSE/SCOTS performance indicators used to
measure performance of the roads assets. 
Performance Indicator 2019/20 2020/21 2021/22 2022/23 2023/24
(target)
RDS_PI010 - Percentage
of top priority winter gritting
routes completed on time
98.76 98.74 99.2 98.6 100
CP_20 (RCI) - % of overall
road network that should be
considered for
maintenance treatment
37.3 37.1 33.9 34.8 34.8
SOL_ENV04b - % of Class
A roads that should be
considered for
maintenance treatment
38.8 36.3 29.9 30.7 36
SOL_ENV04c - % of Class
B roads that should be
considered for
maintenance treatment
36.8 32.6 29.4 28.9 32
SOL_ENV04d - % of Class
C roads that should be
considered for
maintenance treatment
46.9 44.9 39.4 39.9 42
SOL_ENV04e - % of
unclassified roads that
should be considered for
maintenance treatment
33.7 35.6 33.9 35.4 37
RDS_PI008 - Bridge Stock
Condition Indicator
(average BSClav)
85.7 86.1 85.8 86.4 86.4
RDS_PI009 - Bridge Stock
Condition Indicator
(BSCIcrit)
75.3 75.6 74.2 74.8 75
OP_PL_LIGHT_01  -  %  of
lamps restored to working
condition within seven days
93.9 94.8 94.7 96 96
OP_PL_LIGHT_06a -
Average annual electricity
consumption per street light
(kw hours)
199.6 192 184.9 184.9 180
RDS_PI003 - % of street
lights which are LED
60.8 61.9 65 79.5 81

Page 62

Page 34 of 42 
The target for RCI % of road network that should be considered for maintenance treatment is
to maintain current road condition. The targets for the A, B, C and Unc roads are variable due
to the differences in survey timings and %s of each classification of road that are surveyed
annually. Road condition can deteriorate quickly as a result of inclement weather, subsidence
and material failures. 
Further performance information is reported through SCOTS/APSE to enable benchmarking
between authorities in Scotland and assist in sharing and learning through best practice. 
16. Action Plan 
Asset Management Plan Action Plan 
The following actions have been identified as the Road Asset Management improvement
actions and are recorded on Covalent. 
Action Ref Action Lead Timescale
RAMP_A02 Develop risk-based approach for
illuminated sign approval, produce
policy document for implementation
and assess impact and possible
requirement for committee
approval.
Lighting
Manager
March 2024
RAMP_A15 Review & Update Rural Lighting
Policy in respect of updated Arran
Plan and Legal comment
Lighting
Manager
March 2024
RAMP_A21 Assess NAC impact & policy for
illuminated sign reduction arising
from Risk Based guidance
Lighting
Manager
March 2024
RAMP_A22 Integrate Roads & Building
Services lighting operational and
financial management systems
Lighting
Manager
March 2024
RAMP_A23 Review & Update Road Lighting
Policy to incorporate guidance on
Non-Road Assets and other
services impacts”
Lighting
Manager
March 2024
RAMP_A30 Develop a programme for the
structural review and re-
assessment of bridges.
Team
Leader
Structures
March 2024
RAMP_A31 Review the results of bridge scour
assessments and create database
of scour risk.
Team
Leader
Structures
Ongoing

Page 63

Page 35 of 42
Action Ref Action Lead Timescale
RAMP_A32 Use coastal inspections to identify
and prioritise long term
maintenance requirements for
coastal assets.
Team
Leader
Flooding
March 2024
RAMP_A33 Undertake location surveys for
watercourses and review and
update the schedule of
watercourses in accordance with
legislative requirements
Team
Leader
Flooding
Ongoing
RAMP_A34 Assess the suitability of low carbon
road materials for use on the NAC
road network
Network
Manager
March 2024
RAMP_A35 Review the sustainability/lifecycle
of historical and current road
surfacing materials
Team
Leader
Asset
Management
March 2024
RAMP_A36 Option appraisal for inspection and
management of non-adopted road
network assets
Team
Leader
Asset
Management
March 2024
RAMP_A37 Prepare a proposal for the
removal/replacement of obsolete
flashing 20s outside schools
Team
Leaders
Network
March 2024

Page 64

Page 36 of 42 
17. Glossary 
The following abbreviations are used in this plan:
ACoP
ADC
AMP
APSE
BCI
BSClav
BSClcrit
CSS
DRC
GRC
HGV
IA
LCP
LTS
NRSWA
RAMP
RAUC(S)
RCI
RMS
SCOTS
SRMCS
SRWR
SPI
TRO
WDM
WGA
Approved Code of Practice
Annualised Depreciated Cost
Asset Management Plan
Association for Public Service Excellence 
Bridge Condition Indicator 
Average Bridge Stock Condition Indicator
Critical Bridge Stock Condition Indicator
County Surveyors Society
Depreciated Replacement Cost
Gross Replacement Cost
Heavy Goods Vehicle
Improvement Action
Lifecycle Plan 
Local Transport Strategy 
New Roads and Street Works Act
Road Asset Management Plan
Roads Authorities and Utilities Committee (Scotland)
Road Condition Indicator
Roads Management System 
Society of Chief Officers of Transportation in Scotland
Scottish Road Maintenance Condition Survey
Scottish Road Works Register
Statutory Performance Indicator
Traffic Regulation Order
Williams Detail Management Limited 
Whole of Government Accounts

Page 65

Page 37 of 42 
The following terms are used in this plan:
Annualised
Depreciation
Asset
Management
The cost of annual deterioration of the road network if no
maintenance works are carried out.
A strategic approach that identifies the optimal allocation of
resources for the management, operation, preservation and
enhancement of the Road infrastructure to meet the needs of
current and future customers.
Asset Valuation The calculation of the current monetary value of an authority’s
assets.
Depreciation The systematic allocation of the depreciable amount of an
asset over its useful life arising from use, ageing, deterioration
or obsolescence.
Depreciated
Replacement
Cost
Method of valuation which provides the current cost of
replacing as asset with its modern equivalent asset less
deductions for all physical deterioration and all relevant forms
of obsolescence and optimisation. 
Gross
Replacement
Cost
Levels of
Service
The monetary cost of replacing the existing asset with a
modern equivalent asset. 
A statement of the performance of the asset in terms that the
customer can understand. 
Lifecycle Plan Document defining the standards applied to an asset  and
detailing the management processes used to deliver those
standards.
Public Realm Publicly owned streets, pathways, right of ways, parks, publicly
available open spaces; all areas to which the public has open
access 
Road
Infrastructure
Assets 
Section 7
Agreement 
Statutory
Undertakers
An authority’s portfolio of road assets including roads,
segregated footpaths and cycle routes, structures, lighting,
traffic management systems, etc. Together they function as a
system or network which as a whole is intended to be
maintained at a specified Level of Service (assessed through
performance measures) by the continuing replacement and
refurbishment of its assets and elements.
A Roads Authority and Scottish Water may agree to the
provision, management, maintenance or use of their sewers or
road drains for the conveyance of water from the surface of a
road or surface water from premises and that neither party shall
unreasonably refuse to enter into such an agreement or insist
on terms or conditions unacceptable to the other party.
Various companies and agencies with legal rights to carry out
works on the road.

Page 66

Page 38 of 42 
18. Appendix A – Maintenance Hierarchy Mainland & Cumbrae 
Strategic 
Main Distributor
Secondary Distributor
Link and Access Roads

Page 67

Page 39 of 42 
19. Appendix B – Maintenance Hierarchy Arran 
Strategic 
Main Distributor
Secondary Distributor
Link and Access Roads

Page 68

Page 40 of 42 
20. Appendix C – Carriageway Prioritisation Criteria 
The annual carriageway resurfacing programme is developed using WDMs UKPMS Scheme
Manager software. 
This takes into consideration the following data when determining prioritisation of
carriageways for inclusion in the works programme. 
The following road condition data sources are used:
• Scottish Road Maintenance Condition Survey Data
• RoadAI Condition Data
• SCRIM 
Primary condition data sources utilised for each classification of road are:
A, B & C roads are using SRMCS
U class are using RoadAI 
Local Rankings are also included:
• Accident Data
• Road Hierarchy
• Defects 
Scheme Manager produces a prioritised list of carriageways in need of maintenance
treatment. This includes a determination of the most efficient treatment type i.e. surface
treatment, thin surface or inlay/overlay, taking into account its condition and lifecycle.
The outputs from Scheme Manager are then compared to the Locality Inspectors annual
Condition Assessments to identify any areas that may not have been highlighted through
this process.

Page 69

Page 41 of 42
21. Appendix D – Footway Priority System

Page 70

Page 42 of 42
22. Appendix E – Structures Priority System
Structure Name:
Date when the scoring is carried out: Structure Name:
Structure Net score % of
Maximum Score total Score
No. Factors Score Input Additional comments
1
Type of Bridge 1 Score 1 if road bridge and 0
if foot bridge
Culverts, Subways which carry road shall be
considered as road bridge as per this scoring
system. Structures which carry only pedestrians,
cyclists and equestrians shall be considered as
footbridge.
1
NA
2 Route Factor 40 Score based on NAC route
hierachy
Route hierachy 0 0 0%
Cat 2 - SPT/ NAC strategic routes - 40
Cat 3a - Main distributor routes - 30
Cat 3b - secondary distributor routes - 20
Any other category - 10
Routes serving fewer than 5 properties - 5
3 HGV Restriction 20 Score based on weight capacity Weight restriction 0 0 0%
factor 3 tonnes - 20
7.5 to 13 tonnes tonnes - 15
18 tonnes - 10
26 to 38 tonnes - 5
No weight restriction - 0
4
Condition factor 10 Score based on the condition of
the bridge
Sliding score based on 0 for very good condition
to 10 for poor condition. (10 - (BCI crit/ 10)) 0 0 0%
5
Deterioration
factor
10 Score based on the rate of
deterioration of the structure
Sliding score based on 0 for very slow
deterioration to 10 for rapid deterioration 0 0 0%
6
Pedestrian
factor
30 Score based on pedestrian usage.
Bridges with footways of heavy
pedestrian usage shall score a
maximum of 30.
Structures with footways in heavily used urban
areas score 30. Score 30 if route is access to a
school or railway station. Apply a sliding scale
going down to 0 for rural structures without
footways.
0 0 0%
7
Flooding factor 40 Score based on the potential for
the existing structure to
contrubute to flooding
A structure that makes no contribution to
flooding risk will score 0. Structures that are
know to increase the risk of flooding due to
restrictions in width or soffit height will score 30.
0 0 0%
8
Scour factor 60 Score based on risk of collapse
due to expose to scour in heavy
flow conditions
Risk of collapse of structure due to scouring.
Structures which have been deterioted severely
because of inadequate scour protection and on
verge of collapse score maximum. Scour risk
based on a sliding scale.
0 0 0%
9
Parapet Condition
Factor
15 Score based on the condition of
the parapets
Structures with substandard Parapets with poor
conditon will score 15 . Structures with
substandard parapets with a 'monitor only'
recommendation will score 10. Structures which
have parapets to current standards will score 0.
0 0 0%
10
Parapet Risk
Factor
10 Score based on risk in the event
of a parapet collapse leading to
high risk injuries and human
casualties.
What is the likelihood of someone getting high
risk injury or even death while the parapet is
open to use considering the condition of the
structure. Risk based on a sliding scale. 0 -5 100%
11
Delay factor 20 Score based on whether existing
restrictions such as limited width
cause delays at the structure
Structures where delays are caused by width,
weight, height or other restrictions such as
traffic lights will be given a score higher than
zero. Delays less then 2 minutes at peak times
will score 10 and longer than 2 minutes will score
20. Score maximum if fire station, railway station
or hospital affected by delay.
0 0 0%
12
Structure Risk
factor
10 Score based on risk in the event
of a Structure collapse leading to
high risk injuries and human
casualties.
What is the likelihood of someone getting a high
risk injury or even death while the structure is
open to use considering the condition of the
structure. Risk based on a sliding scale.
0 0 0%
13
Maintenance
factor
30 Score based on maintenance
required to keep the existing
structure open.
Score based on known maintenance history and
requirement. No maintenance requirement will
score 0. Listed structures score 15. 0 0 0%
14
Diversion factor 20 Score based on the length of the
diversion route if the structure is
closed in an unplanned manner
with no finite time limit.
Score based on diversion length. Any diversion
equal to or more than 20 miles scores 20. Score 1
for each mile of diversion up to 20. Score 20 if a
road closure adversly affects a fire or railway
station or hospital. Score 20 if there is no
alternative diversion. 
0 0 0%
-5

Page 71

Page 43 of 42 
Note maximum score that can be achieved for road bridge= 500   
Priority level Chart Structure Name:         
Date of Scoring: 00-Jan-00       
Priority Level Indicator  Overall works (500) Structure works (100) Parapet works (70) Scour Protection (60) 
Level Score Level Score Level Score Level Score 
No Action Rquired          
Low Priority          
Medium Priority          
High Priority          
Immediate action required                     
Note : Works are divided above into three sub categories as each work can be independent and 
each has its own significance in terms of attention required.

Page 72

1 
ASSET MANAGEMENT PLAN 
FLEET

Page 73

2
1. Introduction
The Council operates over 500 vehicle and road registered items of plant, with a replacement
value of £27.98 million, along with a large number of other plant and machinery to support the
delivery of services. Assets are primarily maintained in the Council’s workshops at Kilwinning
and Arran supported by specialist external contractors where required. The cost of operating
and maintaining the assets including fuel use is currently £4.82 million per year. These assets
are supplemented by both externally hired assets to meet long-term specialist needs or short-
term business needs accounting for approximately £0.38million annual expenditure.
The Kilwinning workshop is a DVSA (Driver and Vehicle Standards Agency) approved MOT
testing station for classes 4 (cars, light vans, and passenger vehicles of up to 12 seats), 5
(passenger vehicles with more than 13 seats) and 7 (goods vehicles up to 3500Kg Designed
Gross Weight) and operates a tachograph calibration and repair facility.
A two-shift working arrangement is in place to enable operational availability of the workshop
from 0630hrs to 1800hrs; this pattern maintains the capacity of the service during the core day
whilst supporting the daily requirements of fleet users. These arrangements are also
complemented by mobile mechanic arrangements as appropriate. The Arran workshop is
available from 0800hrs to 1630hrs.
Operation of Large Goods Vehicles is controlled through a regulatory regime enforced by the
Traffic Commissioner through an ‘Operator’s Licence.’ The Transport Manager is the qualified
holder of the ‘Operator’s Licence’ for the Council and has responsibility to ensure that all
vehicles and drivers operate within the legislative and safety requirements of the conditions
and undertakings imposed by the Traffic Commissioner.
2. Aims & Objectives
This Fleet Asset Management Plan identifies how it will contribute to achieving the Council’s
vision ‘To be a North Ayrshire that is Fair for All’ and mission statement “Working together
to improve well- being, prosperity and equality in North Ayrshire.”
The effective allocation, utilisation, and operation of a well-maintained, fuel-efficient vehicle
asset fleet, contribute towards many of the deliverables across all Council services which
include:
• Wellbeing
• Communities & Local Democracy
• Climate Change
• A Sustainable Council
•
Effective management of fleet related assets is critical to the delivery and performance of
Council services. This Fleet Asset Management Plan sets out and controls the management
of the Council’s fleet related assets. Our vision is to provide effective fleet procurement,
management, and a workshop maintenance service, enabling our users to deliver safe,
reliable, and cost-effective services to our communities, with a commitment to significantly
reducing our reliance on fossil fuels and to make our assets environmentally sustainable.
The objectives of the Fleet Asset Management Strategy are:

Page 74

3 
• Assets fit for purpose - All vehicles/plant and equipment will be ‘fit for purpose’ in terms
of condition and suitability for the intended use.
• Safety - The vehicle/plant or equipment must secure the minimum health and safety
risk to our staff and members of the public.
• Assets used effectively – Assets will be treated as a corporate resource, and the need
to own/maintain the vehicles/equipment will be regularly challenged with users and the
performance of assets will be monitored and reported with the aim of eliminating
unnecessary expenditure.
• Sustainability - Assets, which run efficiently, maximise value for money, are
environmentally and energy efficient contributing directly to delivering reductions in
carbon emissions inclusive of the environmental life cycle of the vehicle and
component parts (including fuel). This links directly to our Council Plan climate change
priority. 
In meeting these aims the Transport Hub commits to: -
• Collaboration with stakeholders to identify additional value from the standardisation of
vehicles and equipment across North Ayrshire Council.
• Provision and maintenance of a modern vehicle fleet that is fit for purpose and fully
supports the delivery of front-line services.
• Ensuring Council Services have the appropriate vehicles to carry out their
responsibilities and duties.
• Demonstrating Best Value.
• Considering the needs of Stakeholders.
• Ensuring Fleet Asset Management information and data is collected and stored
effectively within its Fleet Management System (Fleetwave).
• Ensuring vehicles are maintained to DVSA (Driver and Vehicle Standards Agency)
standard.
• Undertaking safety inspections (currently annual for vehicles under 3500kg and every
eight weeks for vehicles over 3500kg as defined by the terms and conditions applicable
to our Operators Licence) to ensure vehicles are fit for purpose, kept roadworthy and
comply with Construction & Use Regulations.
• Providing in-house Class IV, V & VII MOT facility by DVSA trained mechanics.
• Using approved and calibrated inspection equipment. 
3. General Description
The Council operates a fleet of 557 vehicles and plant registered for the road along with many
other plant and machinery to support the delivery of services. The permanent vehicle fleet is
supplemented by 125 short-term hired assets to meet fluctuations in business activities, such
as the Car Club and seasonal work within the Streetscene Service or short- term contracts
within Building Services and Care at Home. 
A planned preventative maintenance and inspection schedule is in place at periods ranging
from eight weekly to annually, depending on the type and use of each vehicle. This is
supported by a daily reporting system to identify any defects before vehicles are used to
ensure roadworthiness. All repairs are documented to ensure that works carried out on Council
vehicle assets are recorded to enable effective asset management and to ensure that
throughout the vehicle’s life it is maintained in a safe, legal, and roadworthy condition. 
The Transport Hub is an accredited Van Excellence operator which is a scheme designed by
some of the best van operators in the UK and facilitated and managed by Logistics UK to

Page 75

4
recognise excellence and improve operational standards. At its heart is the Van Excellence
Code which is a code of practice outlining ‘what good looks like in van operations.’ This helps
ensure that the Council continue to operate to nationally recognised best practice standards.
3.1 Asset Types
Asset Type Number of Assets % of Fleet
Passenger Vehicles 80 14.0%
Minibuses 18 3.2%
Bus 8 1.4%
Large Goods Vehicles over 3500Kg 74 13.3%
Compact Sweepers 12 2.2%
Vans and Tippers up to 3500Kg 282 51.0%
Road Registered Plant 83 14.9%
Total 557
4 Current Performance/Drivers for Change
There are several influences that will impact upon the future requirements and use of the fleet
assets that need to be considered including: -
 National commitments for reduction of transport emissions have been made, with the
2019-2020 Programme for Government committing to phase out the need for any new
petrol and diesel light commercial vehicles by 2025 and to create the conditions to
phase out the need for all new petrol and diesel vehicles in Scotland’s public sector
fleet by 2030.
 The Council’s commitment to achieve net zero carbon emissions by 2030.
 The Council’s Transformation programme seeks to review the current methods of
delivering services to ensure that the Council can still deliver high quality customer
focused services within reduced financial resources. Many of the Council’s services
utilise fleet assets to support their delivery.
4.1 Increasing Fleet Utilisation and Transport demand management
Though the introduction of telematics it is possible to access and manage real time information
on the utilisation and efficient use of the vehicle fleet. This ensures that vehicles are being
used and driven as efficiently as possible. The information enables the Transport Hub to
engage with services and jointly manage demand for vehicles, with the aim to reduce the miles
driven, look at whether trips are necessary, and consider if they can be combined or whether
the optimum routes are being used.
The reviewing of efficient vehicle use will ensure that vehicles are being used as efficiently as
possible and using the least amount of fuel. The key areas here are driver performance and
vehicle maintenance, as both have a significant impact on fuel. The effective deployment and

Page 76

5
analysis of the telematics data will help support the review by evidencing the demand for
vehicles and key areas where we can optimise the utilisation across the fleet.
4.2 Service Transformation
To meet the financial challenges facing the Council, services are subject to fundamental
review. Where services utilise transport within their delivery it is expected that reviews will
seek to utilise this more efficiently. This may impact upon areas including number or type of
vehicles, the need for transport and hours of operation.
4.3 Sustainability
The Scottish Government has set out an ambition to phase out the need for any new petrol
and diesel light commercial vehicles by 2025 and to create the conditions to phase out the
need for all new petrol and diesel vehicles in Scotland’s public sector fleet by 2030.
The need for public sector leadership is key to realising this ambition. The Transport Hub faces
a challenge as it aims to reduce environmental impacts through a combination of cleaner
vehicles and fuels, fuel-efficient operation, and driving; and by reducing the amount of road
traffic it generates. To get to the point where ULEVs can be acquired and deployed into the
Councils fleet successfully, the infrastructure needs to be ready. The Council are already
forging the way with workplace charging options. The team continue to successfully engage
with the Switched-on Fleet initiative, facilitated by Transport Scotland and The Energy Savings
Trust. This initiative offers grant funding which can be used towards the procurement of
Workplace Chargers and associated infrastructure.
4.5 Car Club
The Council’s pool car scheme was successfully re-launched during 2022/23 with an aim to
reduce carbon emissions and expenditure associated with staff business travel. Over 1,500
members of staff have signed up to the scheme, with access to 11 low emission vehicles and
four EV’s across seven Council office locations. Our aim is to expand the club’s EV capacity
which will further reduce emissions and expand the scope to increase workplace chargers to
support these within the scheme.
4.6 Business Development / Commercialisation
Commercialising opportunities now forms part of all future business developments of the
Transport Hub, this will include promoting the use of the pool of fleet vehicles and drivers,
maximising the potential use of the Councils MOT test centre and maintenance facility, the
provision of certified driver training and review opportunities for shared services with other
public-sector bodies.
4.7 Vehicle Advertising
All commercial and light commercial vehicle fleets carry the Council’s corporate
branding/colours and logo. The Council’s distinctive fleet are highly visible throughout North
Ayrshire and is a highly effective channel for outdoor advertising. It is now standard practice
to use these vehicles to promote Council events, services, and campaigns, reducing the need
for other forms of outdoor advertising.
5 Condition and Suitability

Page 77

6 
The Transport Hub provides and maintains vehicles for a range of Council services as set out
in the table below: 
Service Area Owned Vehicles Hired Vehicles Electric Vehicles
Building Services 111 32 2
Roads and Transportation 39 6 0
Streetscene 98 8 5
Waste Management 49 7 2
Facilities Management 26 7 11
Educational Resources 10 0 0
PMI 1 0 1
Social Services 113 65 0
Corporate Services 1 0 1
Transport 61 0 25
Total 510 125 47 
A well-maintained vehicle fleet provides a positive image of the Council to the public and
minimises service disruption attributable to breakdowns and associated re-active maintenance
and ensures compliance with the appropriate regulatory frameworks. Getting the most out of
vehicles over a longer period of time and the key aim to maximise the use of each vehicle,
maintain regulatory compliance and wherever possible extend its useful life beyond initial
planned parameters. 
Planned Maintenance
A planned preventative maintenance and inspection schedule is in place at periods ranging
from eight weekly to annually depending on the type and use of each vehicle. In addition,
having an effective way to report defects is a key part of the Councils vehicle maintenance
regime. A ‘nil defect’ reporting system is in place whereby drivers must undertake a range of
vehicle safety checks and complete pro-forma to confirm roadworthiness before use.
Vehicle Checks
A ‘nil defect’ reporting system is in place whereby drivers must undertake a range of vehicle
safety checks and complete pro-forma to confirm roadworthiness before use. Where safety
critical defects are identified, a replacement vehicle must be used until the transport service
has completed the appropriate repair.
Technology
All Large Goods Vehicle are now specified to have lane assist and AEBS (advanced
emergency braking system) fitted as standard. All vehicle technological advancements are
being reviewed as they become available on the marketplace for the possible inclusion in our
future vehicle purchasing specifications. 
All vehicle inspections, repairs, servicing works, and fuel use are recorded using the
proprietary ICT fleet management system (Fleetwave) to establish the whole life costs of each
asset. The Fleetwave system ensures that information can be accurately recorded and utilised
to inform future asset management and purchasing decisions.
Telematics have been installed into most fleet vehicles which reports on vehicle usage and
driver behaviours this technology allows the Transport Hub to easily capture the necessary
data to establish exactly how the fleet is being utilised and where improvements can be made.

Page 78

7
Driver Training
Provision of core driver/operator training is undertaken by our in-house Fleet Compliance
Team. This training has been developed to fulfil our health and safety responsibilities, statutory
duty and to provide staff with the skills they need to undertake their roles. We are a Joint
Approvals Unit for Periodic Training (JAUPT) accredited training centre this enables us to
deliver Driver Certificate of Professional Competence training straight to our teams and in a
way that ensures as little disruption to services as possible. We also have a qualified
instructor/assessor accredited to RTITB Road Transport Industry Training Body for delivering
plant and machinery training.
Driver licence checks are carried out every six months for all fleet asset drivers to ensure the
staff members continue to hold the required category for the type of vehicles they drive.
6 Sufficiency
Use of Assets
Transport assets are utilised by the Council to assist or facilitate the delivery of services to the
whole or part of the community, businesses, and visitors. Examples include: -
 Collection of Waste and Recycling from households and businesses;
 Cleaning of Streets and maintenance of public land and open spaces;
 Maintenance and repair of homes for Council tenants;
 Winter maintenance and repair of roads;
 Transportation of school children;
 Care at home and welfare services for elderly and vulnerable members of the
community:
 Provision of hub and spoke catering facilities for school meals.
Vehicle drivers, passengers and other users are consulted to ensure we are well informed and
that we capture the key requirements needed for securing a fleet that is fit for purpose. These
groups are users of the fleet assets, and their operational knowledge and experience is
important in ensuring the procurement of replacement assets focuses on the right
requirements. This also empowers users in determining better options.
Lifetime Performance
Pressure on the Councils fleet budgets and a desire to optimise vehicle utilisation has led to
an increasing focus on making vehicles work longer, harder and smarter. However, simply
extending the mileage or length of time for which a vehicle operates is not necessarily the best
way to run an efficient fleet.
Rather than implementing a fixed vehicle replacement cycle across the fleet, the Transport
Hub looks at a wide number of parameters such as operational measurements, by
interrogating an individual vehicle’s data, the team may find that some vehicles are best
replaced after a different period. This type of enhanced vehicle replacement forecasting
involves the Transport Hub assessing data about specific vehicles, in order to identify
inefficient and costly vehicles for disposal or to retain vehicles that are performing more
efficiently.
7. Financial
7.1 Annual Revenue Costs

Page 79

8 
The annual revenue cost of maintaining and operating the vehicle and road going plant items
is currently £4.82 million of which £3.06 million is attributable to fleet management and
maintenance and £1.76 million to fuel.
7.2 Service Level
The centralised Transport Hub, which incorporates, Fleet Compliance, Maintenance and
Journeys teams allows a more corporate and strategic approach to the management of the
supply and demand for transport across services. The Hub manages all the Councils
consolidated transport related budgets. The cost of transport provision is allocated to services
annually based on their specific requirements. Management information regarding vehicle
costs and usage is also available to users in a form and timescale that enables appropriate
management interventions in respect of use and deployment. The mechanism aims to provide
greater transparency and control in the allocation of costs to services in operating vehicles by
allocating costs in the following ways: -
 An annual fixed fleet management charge per vehicle in respect of the fixed costs and
overheads of service provision;
 A fleet service charge for each vehicle based on planned maintenance and operating
cost along with reasonable levels of wear and tear;
 Re-charge of actual costs incurred for repairs undertaken arising from unreasonable
or inappropriate use of a vehicle thereby enabling appropriate management
intervention;
 Fuel recharges are based on actual consumption by each asset;
 Re-charge of actual contract costs for taxi and plant hire provision. 
7.3 Capital Investment
Assets are currently purchased outright through the Council’s capital programme. Whilst
capital financing can be secured this is the preferred method of purchase as it provides
maximum flexibility and control in the use and lifecycle of the assets. However, the decision
to finance assets will be reviewed on a regular basis to ensure that the most appropriate
method is utilised in response to developments within financial markets.
The Council has replaced 434 vehicles at a capital cost of £13.97 million over the past eight
years as set out in the table below. 
Year Number of Vehicles
Replaced
Replacement Cost
(£)
2015/16 92 1.99m
2016/17 54 2.03m
2017/18 61 2.08m
2018/19 97 1.84m
2019/20 37 1.04m
2020/21 52 2.04m
2021/22 29 1.48m
2022/23 12 1.47m

Page 80

9 
Total 434 13.97m 
The estimated asset replacement costs together with allocated Capital funding are set out in
the table below for each of the next 8 years. The forecast costs include for vehicle
replacements based on 2030 target date to decarbonise the 397-vehicle fleet currently suitable
for the transition to alternative fuelled vehicles. 
Year Estimated Replacement Costs
(£)
Capital Programme
(£)
2023/24 3.26m 3.36m
2024/25 2.84m 1.02m
2025/26 3.66m 2.00m
2026/27 4.90m 2.98m
2027/28 3.62m 2.00m
2028/29 3.44m 2.00m
2029/30 3.35m 2.00m
2030/31 2.88m 2.00m
Total 27.98m 17.36m 
The profiling of the above illustration is based on a decarbonisation model undertaken which
considered remaining lifespan of current combustion vehicles, the need for a managed
approach, and the lead-in time for vehicle charging investment.
The value of the capital programme during this period is significantly less than the replacement
value due to an increase in today’s purchase costs for alternative fuelled vehicles and the
relevant infrastructure.
It is estimated that the total capital funding required to replace all 397 vehicles suitable for low
emissions alternatives alone to be is £15.85m (which includes both vehicle replacement and
assumed charging costs), based on today’s prices, this equates to a 100% (£7.92m) increase
in costs compared to ICE (Internal Combustion Engine) vehicles. The figure also excludes
those 160 vehicles which do not currently have a cost-effective solution.
The ability of the Council to decarbonise the fleet in the short to medium term will be
particularly challenging. However, the estimated figures may change due to ongoing
Transformation Projects and Service reviews which may impact upon the number of vehicles
required in the future. Further information is provided at section 13 below.
7.4 Expiry
The vehicle replacement plan identifies the anticipated lifespan to enable accurate financial
planning. However, to maximise the value of each asset replacement is made on a condition
basis or a notable change in user requirement. To extend their life vehicles may be transferred

Page 81

10 
to other services, utilised within the central transport pool to reduce the need for hire vehicles
or used to replace a vehicle that is no longer economically viable.
Capital funding for fleet replacement vehicles was reduced by 25% over the past 5 years
(£2.5m), this had a significant impact on the revenue budgets due to maintaining the assets
over a longer period which resulted in additional down time and reduced vehicle reliability.
We are also likely to see an increase in the length of lead time for vehicles for all fuel types,
but more so for alternatively fuelled vehicles, which have an increasing demand and smaller,
more expensive, production runs. Improved planning for replacement cycles for vehicles is
therefore essential.
7.5 Disposal
At the end of their useful life with the Council vehicles are disposed of through an auction
house or directly to specialist dealers ensuring that the best price is attained. Vehicles which
are deemed to be beyond any use at end of life will be disposed of through recognised
accredited vehicle dismantlers. Such receipts are not expected to exceed £100,000 annually
and are returned to the Council’s capital fund.
8. Legislation 
There is an extensive regulatory regime in place regarding the provision and operation of the
assets which in the case of Large Goods Vehicles is enforced by the Traffic Commissioner. 
An operator's licence (or O licence) is the legal authority needed to operate goods vehicles in
Great Britain. The licence is issued by the Traffic Commissioner – the independent regulator
of the commercial road transport industry; a Traffic Commissioner also has powers to take
regulatory action against a licence holder where they fail to meet the expected standards of
operation. The Transport Hub acting as the Councils,fleet operator must ensure compliance
and relevant process are in place. 
When planning for fleet provision, cognisance of the following legislative requirements is
required:
• Operator’s Licence (Goods Vehicle – Licensing of Operators) Act 1995
• Construction and Use Regulations 1986
• Vehicle Lighting Regulations 1986
• Driving Licences Regulations 1999
• The Road Traffic Act 1991
• Registration and Licensing Regulations 1971
• The Health and Safety at Work Act 1974
• The Management of Health and Safety Regulation 1999
• Provision and Use of Work Equipment Regulations 1998
• Lifting Operations and Lifting Equipment Regulations 1998
• The Climate Change (Scotland) Act 2009 
9 Policy/Guidance
Council Plan

Page 82

11 
This Fleet Asset Management Plan identifies how it will contribute to achieving the Council’s
vision ‘To be a North Ayrshire that is Fair for All’ and mission statement “Working together
to improve well- being, prosperity and equality in North Ayrshire.” 
This Asset Management plan outlines our key priorities for the next three years and details
how the Fleet asset will support our people to deliver these. This plan also gives an overview
of our key actions and the performance indicators that we will use to measure how well we
are meeting the needs of the communities we serve.
The effective allocation, utilisation, and operation of a well-maintained, fuel-efficient vehicle
asset fleet, contribute towards many of the deliverables across all Council services which
include:
• Wellbeing
• A Sustainable Council
• Climate Change 
10 Health and Safety
All vehicles and equipment must be fit for purpose and need to be managed effectively to
support our services and ensure the health and safety of staff, customers, and the wider
community.
The provision of fleet vehicles and plant which are fit for purpose and provide both an
efficient and safe working environment by meeting all the requirements of our Operator’s
Licence and satisfies all Health & Safety, Legislative and Statutory requirements.
11 Risk Management
There are several inherent risks in the operation of the assets and their provision to service
users. These risks are assessed utilising an impact and likelihood matrix to establish the extent
of the risk and to inform the actions required to mitigate the risk to a level such that operations
can be maintained to an acceptable level. 
Key Risks 
Risk
Likelihood
Rating (A)
Impact
Rating
(B)
Risk
Score
(A + B) 
Consequence  Current Controls 
Extension of
asset beyond
economically
viable life  3  3 
9
 Service disruption
due to increased
breakdowns
 Increased
maintenance costs
 Loss of
‘Operators’
Licence 
 Planned Maintenance
programme
 Timely replacement
programme 
Loss of
‘Operators’
Licence 
3 3 
9  Cannot utilise
transport to deliver
services
 ‘Nil’ defect daily
checklist to be
completed prior to
vehicle use
 Planned maintenance
and inspection cycle

Page 83

12
 Driver training
programme
Increased
environmental
controls in
respect of
vehicle
emissions 3 2
6
 Fleet does not
meet legislative
standards
 Cannot utilise
transport to deliver
services
 Increased costs to
hire in
appropriately
compliant
vehicles.
 Timely replacement
programme
 Evaluation of
alternatively powered
vehicles
 Planned maintenance
programmes to ensure
optimum efficiency in
vehicle operation
Significant
increase in
Price of Fuel 3 2
6  Increase in budget
requirement
 Speedy implementation
of alternatively powered
vehicles
 Securing of bulk supply
contracts
Securing of Fuel
Supply
1 5
5
 Essential Services
cannot be
delivered
 Maintain bulk supply
 Work with Ayrshire Civil
Contingencies Team to
maintain contingency
plan
 Increase the number of
alternatively powered
vehicles to reduce
demand
Insufficient
capital funding
to support the
decarbonisation
of the fleet
3 3
9
 Not meeting the
Scot Gov target
 Increase in
revenue costs due
to retaining
vehicles longer
 Low staff moral
 Increase of vehicle
downtime
 Early engagement within
service reviews
impacting on transport
 Replacement plans re-
phased to significantly
reduce number of
vehicles being replaced
Effective management and the implementation of actions set out within this plan will enable
these risks to be mitigated and an early warning should further interventions be required.
12 Governance of the assets
12.1 Plan Management
The Head of Sustainability, Corporate Property & Transport is responsible for management
and control of the plan, and the Transport Manager is responsible for its implementation.
12.2 User Input
The assets are provided to enable or facilitate the delivery of a range of Council services. The
requirements of services in the utilisation of these assets, particularly in respect of demand
profiles, vehicle specification and future service development, is collated and agreed and in
turn forms an integral part of the asset management plan and its continued development.
12.3 Elected Members

Page 84

13 
This Fleet Asset Management Plan will be presented to Members as a component of the
overall Corporate Asset Management Plan.
12.4 Plan Review
The plan will be reviewed annually as part of the Council’s service planning and budget setting
exercise and in response to planned changes within the delivery of Council services.
13 Service Delivery Aspirations/Challenges 
National commitments for reduction of transport emissions have been made, with the 2019-
2020 Programme for Government committing to phase out the need for any new petrol and
diesel light commercial vehicles by 2025 and to create the conditions to phase out the need
for all new petrol and diesel vehicles in Scotland’s public sector fleet by 2030. 
As part of our ambition to achieve net zero carbon emissions by 2030, work is already
underway in support of transitioning to zero-emission fleet vehicles and progress has been
made in terms of investment in both EVs (Electric Vehicles) and charging infrastructure. 
13.1 Avoiding the need to travel
The Council’s fleet is engaged in essential service delivery, with a need to travel. However,
there may be opportunities to reduce travel demand, including through digital service delivery
and journey planning for essential travel.
In terms of staff business travel, we continue to promote sustainable travel and employees
are reminded to select the best option to meet their business travel needs. The sustainable
travel hierarchy encourages staff to choose the most appropriate solution with the lowest CO2
impact. Staff should continue to be encouraged to choose travel options as close to the top of
the hierarchy as possible.
13.2 Rationalise the current fleet
Fleet rationalisation is the process of reducing the size of the fleet to ensure that each vehicle
is used as efficiently as possible. This involves examining the usage of each vehicle and
removing any vehicles that are excess to requirements, reallocating vehicles within the fleet,
and downsizing vehicles. This can provide cost (revenue and capital) and carbon savings as
vehicles are optimised and less vehicles overall need to be leased, purchased, and
maintained.
The Transport Hub Team continue to critically review the fleet, this has been carried out over
two phases with an aim of rationalising, downsizing, and electrifying the current fleet where
possible.
The work of the team contributed to the provision of a wealth of baseline fleet data and
background in support of the ongoing Fleet Decarbonisation work and continue to provide
valuable support throughout the review and the development of the Decarbonisation of Fleet
Working Group.
At each replacement opportunity the team consider in consultation with the relevant service
whether a vehicle is still required, or if it can be downsized through reviewing operational
requirements, carrying capacity and number of seats required. Fleet rationalisation is therefore
a continual part of our fleet management activity.

Page 85

14 
The Team continues to support frontline service reviews, this can include service redesign or
transformational projects which can result in a reduction in the number of fleet vehicles.
13.3 Use of Telematics
The Council operate a telematics system which is installed in all fleet vehicles.
The telematics system provides decent quality fleet data which is an essential component to
successfully implement zero emission vehicles. The most principal factors to consider when
we are selecting a ZEV (Zero Emission Vehicle) replacement is the daily mileage and
maximum range required, and the opportunities for recharging (usually overnight but also
during the day).
The telematics data is used to help identify potential locations for charging sites. The data
highlights the locations where vehicles are stationary during the day and night along with the
duration that they are stationary for, thereby pinpointing potential locations for charging
infrastructure.
The data is also used to identify vehicles which are underused. This helps inform our fleet
rationalisation decisions, over whether some vehicles can be removed from fleet, or whether
additional work can be put on them to make them more effective.
Overall, our telematics system provides us with a clearer picture of how the fleet is currently
being used. This data will make the process of transitioning the fleet to ZEV’s (Zero Emission
Vehicles) easier, as we can match zero emission technology with vehicles, and accurately
plan our charging infrastructure.
13.4 Switch to low carbon alternatives
Creating a 100% zero-emission fleet will require the replacement of our current vehicles with
a mixture of different technologies. Currently most ZEVs (zero emission vehicles) are battery
electric vehicles (BEVs) but there are also hydrogen options available.
The current fleet includes a range of vehicles intended to serve varying purposes, meaning
that some vehicles would be more suited to switching from conventional fuels to electric than
others. Given the current average range limitations of EV batteries, Council vehicles which
currently travel less than 100 miles per day would have the best potential to switch to electric,
397 vehicles have been identified as being immediately suitable to be replaced by electric
vehicle (EV) alternatives. 
Progress has already been made in relation to acquisition of electric vehicles and we currently
operate 47 EVs, which equates to 11.8% of the 397 vehicles noted above. However, this figure
will change as vehicles reach the end of their contract agreement and returned to the leasing
company. The numbers will continue to fluctuate depending on both lead times and securing
sufficient budget for replacements. 
Nonetheless, the purchase of new passenger and Light Commercial Vehicles (LCVs) will be
zero emission vehicles only, two years ahead of the 2025 target to phase out acquisition of
petrol and diesel versions of such vehicles by public bodies.
To inform how we decarbonise other plant (e.g., tractors), the Scottish Government are
undertaking analysis on the ‘Decarbonisation of mobile agricultural machinery in Scotland.’
This will shape the policies to be developed as part of the upcoming Climate Change Plan.
13.5 Charging Infrastructure- Workplace

Page 86

15 
In parallel with ZEV adoption, the Council must plan for, and install, suitable charging
infrastructure to support our expanding electrified fleet. This will require a mixture of workplace
and home-based charging, as some vehicles are stored on Council premises overnight, and
others are taken home.
The Council has set a target through its Electric Vehicle Strategy (2021-2025) to have 80
workplace charge sockets (44 charge points with varying number of outlets) in place by
December 2025.
As of June 2023, the Council have installed 29 dedicated workplace chargers (65 sockets) to
support the decarbonisation of our fleet vehicles. These have been funded through the
Switched-on Fleets programme which is solely used in support of charge point infrastructure
for fleet vehicles.
The Decarbonisation of Fleet Working Group will continue to review the Council’s non-
domestic buildings and fleet mileage data to identify further opportunities to install workplace
charge points.
The key things to be aware of when designing and implementing a robust charging
infrastructure are:
• Site constraints - such as the available site electrical capacity and current site demand
• The duty cycles of vehicles based at the site - how much time they have available to charge
• The daily mileage requirement of the vehicles based at the site
• The energy requirement of the vehicles based at the site
The new generation of EVs boast a significant range on a single battery charge, and there is
unlikely to be a requirement for a ratio of one charger per vehicle. An EV with a 200-mile range
and a daily route of 40 miles would in theory only need recharging once per week, so one
charger could potentially serve five vehicles.
A system will need to be devised to allow for essential charging, where a vehicle needs a
charge, but a charge point is not available. This could involve either installing a small number
of buffer chargers that are only used for essential charging or advising staff to use public
charge points when available. 
13.6 Heavy Duty Vehicles
The UK Government Decarbonising Transport plan for Heavy Duty Vehicles (HDV) details that
all sales of new medium sized trucks (up to and including 26 tonnes) to be zero emissions
from 2035. with the heaviest (above 26 tonnes) zero emissions by 2040.
The Council is aiming to achieve the public sector fleet decarbonisation targets, these state
that all HDVs (Heavy Duty Vehicles) are to be zero-emission from 2030. With these targets in
mind, the Energy Saving Trust had been commissioned to produce an HDV-focused fleet
decarbonisation report for North Ayrshire Council.
There is a growing number of viable zero-emission alternatives, particularly Refuse Collection
Vehicles (RCV), however at present they do have high upfront costs and it is likely that more
viable zero emission replacements options will appear in the next few years.
Hydrogen is often discussed as a key fuel source in a net zero future. Fuel cell electric vehicles
(FCEVs) use hydrogen to produce electricity, these offer efficient and quiet transport with no

Page 87

16 
exhaust emissions other than water. If fuelled by hydrogen produced from renewable sources,
they are a true zero emission solution.
The main advantage of hydrogen over battery electric is its much higher energy density. This
gives hydrogen vehicles a driving range comparable to conventional fossil fuel ICE vehicles.
However, hydrogen fuel cell electric vehicles (FCEVs) are an innovative technology and are
currently at an earlier stage of development than electric vehicles and it is expected that the
range of available hydrogen vehicles to expand over the next few years along with adequate
refuelling infrastructure.
In support of decarbonising the existing HDV fleet, an interim alternative could be the use of
HVO (hydrotreated vegetable oil). This can offer a potential short to medium term option for
our HDV fleet where ready electric replacements are not available or would be cost prohibitive.
HVO makes sense, not only because it can deliver up to 90% well-to-wheel carbon reduction
but also because it is a drop-in alternative to diesel.
From 2030 onwards the Council will need to consider the procurement of zero emission
HDV’s, these vehicles have the longest life cycles and have the highest potential for CO2e
savings. Were we have HDVs that must be replaced in the short term but have no zero
emission replacement options, we will continue to specify that these are equipped with the
latest Euro 6 diesel engines to help keep our fleet emissions as low as possible. 
14 Performance Indicators
The service has a few performance indicators in place to measure the availability and cost of
maintaining assets, these are benchmarked through the APSE (Association for Public Service
Excellence) performance networks. 
Indicator 2019/20 2020/21 2021/22 2022/23 2023/24
(target)
Fuel Use (litres) 1,678,518 1,466,780 1,514,271 1,572,108 1,500,000
CO2 Emissions (tonnes) 3,938 3,311 3,498 3,689 3,600
% of vehicles serviced
within 7 days of schedule  98  99  99  99  99
% of vehicles passing
DVSA (Driver and Vehicle
Standards Agency) MOT
test first time 
98.57  100  98.55  97.30  100 
The following is a list of additional Key Performance Indicators (KPIs) which the Transport Hub
are regularly reporting. The list is not exhaustive and is for the purpose of demonstrating the
types of information that is collected.
 Vehicle downtime – the number of days’ service lost due to maintenance and repairs.
This allows the Hub to focus on the reasons for an increased figure such as an increase
in vehicle damage or the workshop being under resourced.

Page 88

17
 Vehicle availability – the number of days the fleet was available for use. This is used
to provide information on availability for service demand.
 Vehicle utilisation – this helps identify whether the fleet is too large or too small. It
can also be used to help with decision making on fleet size and to highlight issues with
staff absence.
 Number of accidents – this highlights staff training requirements.
 Number of vehicle defects – these highlight maintenance issues or how an ageing
fleet is adding to the Councils cost. It can also be used as information for selecting new
vehicles.
 Number of MOT failures or first time MOT passes – this is used to measure the
performance of the workshop.
16 ACTION PLAN
Action
Plan
Reference
Action Desired
Outcome Lead Timescale
FAMP A01
Develop the existing EV
working group into a fleet
decarbonisation group, which
will report to our already
established Climate Change
Steering Group.
Working Group
Established Transport
Hub October 2023
FAMP A02
The purchase of new
passenger and Light
Commercial Vehicles (LCVs)
will be zero emission vehicles
only.
Reduction of ICE
vehicles and fleet
produced
emissions
Transport
Hub Ongoing
FAMP A03
To undertake further research,
including with the Hydrogen
Accelerator Project and
consideration of HVO as a
potential short to medium term
option for existing heavy fleet
combustion vehicles.
Reduction of fleet
produced
emissions Sustaina
bility March 2024
FAMP A04
Share the findings of our
decarbonisation routemap
with CPP partners to identify
any potential synergies
including in relation to vehicle
charging infrastructure.
Shared working Sustaina
bility March 2024

Page 89

18
FAMP A05
Review future electricity
generation proposals and
potential links with charging
requirements at depot
locations.
Energy efficiency Sustaina
bility March 2024
FAMP A06
Review the potential
emerging's from our Digital
Strategy and work with
services
Reduction in
demand for
vehicles and
travel
Transport
Hub Ongoing
FAMP A07
Review of EV maintenance
costs and develop mechanics
by supporting attendance of
training on electric/hybrid
vehicle systems repair and
replacement
Identify the needs
and ensure the
demands of future
technologies can
be met
Transport
Hub December
2023
FAMP A08
Review the capital programme
provision for fiscal year
2024/25 onwards to consider
the current £10.620m gap to
further support
decarbonisation requirements.
To meet the
government
targets additional
funding must be
made available
Transport
Hub September
2023
FAMP A09
Lobby Scottish Government
through existing networks
(including COSLA, SOLACE
and the Sustainable Scotland
Network).
Ensure the
financial burden is
voiced and scope
the potential for
any additional
funding
Head of
Sustaina
bility,
Corporat
e
Property
&
Transport
Ongoing

Page 90

1 
HOUSING ASSET MANAGEMENT PLAN 
1. Introduction

Page 91

2 
The Housing Asset Management Plan (HAMP) has been developed to complement:
• The North Ayrshire Local Housing Strategy 2023 - 2028
• The Council’s Housing Revenue Account 30 Year Business Plan (HRA Business Plan)
• Delivery of the Strategic Housing Investment Plan 
The Council endeavours to deliver the best service with the resources available, with the focus
of the HAMP being to set a framework that will:
• Aim for 100% Scottish Housing Quality Standard (SHQS) and achieve full Energy
Efficiency Standard for Social Housing (EESSH/EESSH2) compliance and is aligned
with the Housing to 2040 route map.
• Exceed the standards and outcomes set by the Scottish Social Housing Charter.
• Ensure the Council’s housing stock is maintained in a condition compliant with existing
and proposed legislation and standards. 
1.1 Housing to 2040
The Scottish Government’s “Housing to 2040” paper outlines a long-term vision for housing in
Scotland and sets out key objectives and strategies to address housing challenges and meet
the needs of the population. Key themes include:
• Vision – the paper envisions an environment where everyone has a safe, affordable,
and warm home that meets their needs and supports their wellbeing.
• Affordable Housing – The Government aims to increase the supply of affordable
housing, including social and affordable rented homes, intermediate housing and low-
cost home ownership options. This will be achieved through increased investment,
partnership working and innovative financing models.
• Energy Efficiency – there is a strong emphasis on improving the energy efficiency of
homes to combat climate change and reduce fuel poverty. The Government aims to
ensure that all homes meet high energy efficiency standards, making them more
environmentally sustainable and affordable to heat.
• Quality & Standards – the paper highlights the importance of delivering high quality
homes that are designed to be accessible, adaptable, and inclusive.
• Place Making – The guidance aims to create thriving and sustainable communities by
considering the broader social, economic and environmental factors that contribute to
the quality of housing areas. This includes promoting mixed- tenure developments,
improving public spaces and enhancing community facilities.
• Housing and Homelessness – the paper recognises the need for a coordinated and
efficient housing system, involving collaboration between the Government, housing
providers and other stakeholders. There is a commitment to the prevention of
homelessness and supporting those in need of social housing, with a particular
emphasis on early intervention.
• Digital inclusion – the Government acknowledges the potential of digital technology to
improve housing services and delivery. It highlights the importance of digital
connectivity, smart homes and data-driven solutions to enhance the quality of housing
and improve the lives of residents. 
Housing to 2040 is an ambitious and comprehensive strategy to address housing challenges,
promote sustainable development, and ensure that everyone in Scotland has access to high-
quality, affordable homes that meet their needs. 
The HAMP reflects several key themes, including:

Page 92

3
• The Council’s commitment to embracing effective asset management principles in
relation to its housing stock.
• The importance of maintaining effective stock condition information.
• The assessment of future options for poorly performing or obsolete stock.
• Effective procurement of investment projects carried out under the Housing Revenue
Account.
• The effective delivery of capital investment programmes and planned maintenance
and reactive maintenance programmes that are key to ensuring the housing stock is
maintained in the best condition possible.
The Action Plan at the end of this document captures the over-arching key deliverable tasks
for the 2023-28 period, with appropriate actions being added, removed or amended on an
annual basis.
2. Aims & Objectives
The importance of asset management is evident throughout the Council Plan 2023 - 28. The
HAMP outlines the priorities for the ongoing maintenance and improvement of the housing
stock and is intended to assist the Council on achieving the vision to have a North Ayrshire
that is fair for all and to achieve our mission of working together to improve the lives of our
people in North Ayrshire. The HAMP has been created to support delivery of several of the
key priorities, namely:
Priority - Climate Change
Key activities
• Reducing the carbon footprint of our estate through rationalisation utilising a locality-
based approach and taking a fabric first and low carbon energy generation approach
to homes and buildings.
• Developing local low carbon energy generation schemes and networks.
• Working with communities to adopt low carbon behaviour change and encourage
climate-based volunteering activities.
Priority – Wellbeing
Key activities
• Using our assets to support wellbeing in local communities.
• Through our housebuilding programme and wider housing investment provide homes
for life that meet the needs of our residents.
• Ensure our paces and spaces where we live, work and visit are well maintained and
accessible.
Priority - Communities and Local Democracy
Key activities
• Developing strong relationships with communities and partners based on trust and
shared aspirations using their experiences to inform service provision.
• Supporting the Community Planning Partnership and the North Ayrshire Partnership
Plan.
• Developing partnerships with the third and voluntary sector.
• Ensuring an inclusive, fair, rights-based and asset-based approach in our work.

Page 93

4
Priority - A Sustainable Council
Key activities
• Ensuring robust governance arrangements are in place to fulfil the Council’s statutory
duties, manage risk and support delivery of key priorities.
• Using dynamic data and lived experiences to inform decision-making.
• Working with partners nationally, regionally and locally to secure investment and
target resources towards our priorities.
The delivery of the HAMP has been developed taking account of appropriate
services and stakeholder groups, including:
• Major Works Working Group
• Recognised Tenant and Resident Groups
• Housing Business Plan Group (HBPG)
• Housing Asset Management Board (HAMB)
• SHIP Project Board
In terms of effective governance and management of the HAMP, progress against the
agreed action plan will be regularly monitored through the Housing Asset Management
Board.
3. Asset Management Systems
North Ayrshire Council has a range of systems to assist in delivering our asset management
strategy. Central to effective stock repair and maintenance is the development of robust and
integrated computer systems to monitor operational service delivery and to enable effective
planning. These tools include:
• A dedicated housing asset management software system (APEX) which contains all
property information relating to the housing stock.
• PMI currently holds detailed stock condition data for 96% of our housing stock. This
information is gathered by an independent surveying company. We carry out a cyclical
stock condition programme which covers around 8% of the housing stock each year,
this allows the information held to be continually updated due to continued investment
in our properties. The information from these surveys is held within the APEX system.
• An asbestos management database.
• A process that reviews all homes which meet several criteria e.g. hard to let, significant
works required, estate management issues and continuous void turnover.
• A business case process to test in advance the soundness of major capital investment
proposals.
• An informed experienced team of in-house staff to deliver projects within approved
timescales and budgets.
These are the tools required to enable the Council to take informed decisions regarding future
investment in the housing stock. This investment will ensure that the following outcomes are
achieved:
• Refurbishment of dwellings to ensure they remain attractive, meet modern
requirements and tenant expectations.
• A planned maintenance programme, achieving economies by replacing components
just before they would otherwise require response repairs, anticipating changes in

Page 94

5
minimum acceptable standards, and reducing future requirements for cyclical
maintenance.
• Cyclical maintenance to prevent deterioration in the physical condition of stock.
• A responsive maintenance service, to ensure that tenants remain satisfied with their
accommodation and to prevent unplanned deterioration in its condition.
• An efficient and effective voids repair service, helping to speed up the repairs process
and protect the Council’s revenue and provide additional stock condition data.
4. Repairs and Maintenance
4.1 Response Maintenance
‘Response repairs’ is the term used to refer to day-to-day and emergency repairs e.g. fused
electrical points, burst pipes, broken windows, missing roof tiles, blocked drains etc. To
maintain the housing stock in good condition, tenants are encouraged to report these types of
repairs. The repairs are carried out promptly and effectively by Building Services in
accordance with the Repairs Policy.
North Ayrshire Council will continue to review and endeavour to achieve continuous
improvement, regarding the performance of the response maintenance service. We aim to
achieve a repair service that completes a repair correctly, first time, every time. To ensure that
this is achieved the following arrangements are in place:
• Facilities for easy reporting of repairs which includes a dedicated repairs contact centre
which is operational 24 hours per day.
• Procedures to accurately identify the nature of the repair when it is reported and to
arrange a convenient appointment.
• Procedures to prioritise the urgency of the works.
• A Tenant Handbook, which advises tenants on how to deal with emergencies, how and
when to report a repair, and further supplementary advice e.g. asbestos, gas servicing,
Right to Repair Scheme, energy conservation etc. The Handbook will also confirm the
duty of tenants to keep appointments for repairs, to avoid abortive and/or multiple visits
by staff.
The Gas Safety (Installation and Use) Regulations 1998 require that gas fittings and flues
are maintained in a safe condition for tenants and to carry out safety checks for appliances
and flues every year. North Ayrshire Council employs the services of an external contractor
to carry out all gas related works, under the management of PMI. When a tenant requires a
response repair relating to gas these are carried out by our appointed contractor.
Within the stock profile we have 28 Sheltered Housing Units, these units have several
systems within them such as call systems and door entry systems where response repairs
are not carried out by Building Services, repairs to these systems are administered and
instructed by PMI using specialist contractors.
4.2 Void Repairs
Void property repairs are those repairs, which after inspection and considering its age,
condition and future programmed works, are deemed necessary to bring the property back to
an agreed pre-let standard.
The Council aims to re-let void properties as quickly as possible. When a tenant gives notice
that they intend leaving their property, an initial pre-termination inspection is carried out. This
provides an opportunity to identify repairs required, including those that the outgoing tenant
will be held responsible for. If no repairs are required, the property will immediately be subject
to the allocation’s procedures. During the void process our gas maintenance contractor visits

Page 95

6
the property to isolate the supply to allow any void works to be undertaken safely and assesses
the condition of the current system. At the end of the void period a full service “pre-let” is
carried out
If repairs or improvements are required the new tenant will be notified of the work that requires
to be carried out, which will be completed within reasonable timescales.
4.3 Planned Maintenance
Planned maintenance covers the replacement of items that are at the end of their useful life,
where the replacement can be predicted and planned for.
Expected lifespan for main components (reviewed annually)
Component Expected life
Central Heating (Gas & Elec, ASHP) 15 years
Electrical Rewiring 30 years
Window replacement 30 years
Kitchen 22 years
Bathroom 27 years
Roofing (dependent on roof finish) 43 - 63 years
Rendering 35 years
External Wall Insulation 35 years
Smoke detection 10 years
Programmes of work are prepared for planned maintenance activities. The programmes are
compliant with the requirements of the Scottish Housing Quality Standard. The Council will
seek to implement replacement programmes cost effectively and with a view to minimising
inconvenience to tenants.
Where practical, the Council will group component replacement into packages, with several
components within a property being replaced at the same time.
The current external condition of building components and finishes will be assessed through
a system of annual inspections by Building Service’s officers covering a minimum of 25% of
the properties, so that every property is inspected by Council staff at least once every four
years.
The results are incorporated into an ongoing programme of planned maintenance works. It is
intended to carry out as much maintenance work as possible on a planned basis.
4.4 Cyclical Maintenance
In terms of both statutory and non-statutory cyclical maintenance our responsibilities are to
ensure that:
• All gas heating systems in the properties are serviced annually and have any repairs
carried out quickly and effectively. Accurate records are maintained of all servicing and
maintenance and an escalation procedure is in place to gain access to properties
where the tenants have refused the authorised contractors’ access.

Page 96

7
• Electrical circuits in properties are checked at least once every 5 years.
• Fire Risk Assessments, where required, are carried out at appropriate intervals.
• Where necessary, fire alarm, emergency lighting, lift installations and water hygiene
systems are checked and maintained in accordance with the appropriate legislative
requirements.
• Smoke alarms are working effectively before letting a property to a tenant and that
tenants are aware of their responsibility to report any faulty alarms.
• Annual Portable Appliance Testing (PAT) is carried out in common areas within
sheltered housing units and hostels.
In addition to the above, the Council recognises their duty under the Health and Safety at Work
Act to ensure the risk of exposure to the legionella bacteria is properly controlled. Guidance
to fulfil these duties is set out in the HSE Approved Code of Practice ‘L8’. The Council has
implemented the requirements of L8 in terms of sheltered housing units and flatted
accommodation blocks. This includes completion of risk assessments, water hygiene regimes
and undertaking of necessary upgrade works.
Routine maintenance is essential to preserve the lifespan of components and to maintain the
appearance of properties and estates. Open areas within estates that are the Council’s
responsibility are maintained this includes grass cutting, tree and shrub maintenance. Budgets
have been identified within the HRA 30-year Business Plan for estate management including:
• upgrading of non-adopted footpaths, roads and lighting to adoptable standard
• provision of additional car parking in our estates
• Estate Based Regeneration Programme (EBRP) developed to improve the
appearance of estates throughout North Ayrshire.
5. Asset Portfolio
The HAMP concentrates on the Council’s permanent rented portfolio and sheltered housing
units and the delivery of the Strategic Housing Improvement Plan. At the time of writing, North
Ayrshire Council currently owns 13,273 social housing properties.
The assets are used by the Council to provide social housing for North Ayrshire Council
tenants and applicants on the Common Housing Register. There is a constant demand for
suitable housing and the Council recognises that it is important to make the best use of the
housing stock in line with the demographics of the area, and for there to be a quick turn round
in empty properties.
The overall valuation of the Council’s housing assets as at 31 March 2023 was £572.86 million.
During the period between 2010-2015 the Council invested more than £20 million per annum
to meet the requirements of SHQS. Since 2015 there has been continued investment of more
than £10 million per annum to ensure compliance levels are maintained and new legislative
standards are met.
In addition, at the time of writing, the Council has constructed 831 new homes, and is making
good progress towards our commitment to build a total of 1,625 by March 2028.
The table below illustrates the net book value of the Housing Revenue Account assets.
5.1 Asset Valuation (as at 31 March 2023)

Page 97

8 
Asset Group Stock
Numbers
(units)
Amenity Bungalow 722
Bungalow 647
2 Storey House 6,885
4 in Block 2,833
Amenity 4 in Block 3
Tenement Flat 1,016
Amenity Tenement Flat 221
Sheltered Housing 627
Maisonette 252
Multi Storey Flat 67
Housing Asset Total 13,273
Net Book Value (with vacant possession) £527.86m 
The table below illustrates the distribution of stock by location and bedroom size: 
5.2 Housing Services Stock Breakdown (Location and Bedroom Size) 
Bedsit 1 bed 2 bed 3 bed 4 bed 5 bed 6 bed Total
Ardrossan 20 247 587 331 52   1,237
Barrmill   21 3    24
Beith  206 270 179 15   670
Brodick   27 3 4   34
Dalry  190 379 148 4   721
Fairlie &
Largs   18  16  15     49
Irvine 40 1,024 1,730 1,115 185 1 1 4,096
Kilbirnie  192 521 389 17   1,119
Kilwinning  279 806 398 54   1,537
Largs 7 190 282 61 6   546
Longbar &
Glengarnock   15  42  10     67
Millport   24 5 1   30
Saltcoats  257 572 453 56 1  1,339
Skelmorlie  20 22 4 2   48
Stevenston 3 246 515 697 35   1,496
West
Kilbride   100  84  73  3    260         
Total 86 2,984 5,898 3,884 434 2 1 13,273

Page 98

9 
Two-bedroom properties remain the most common size of the stock total, followed by three-
bedroom properties. Together, two- and three-bedroom properties account for approximately
74% of the total stock. 
6. Performance 
6.1 Stock Condition 
Overall, our housing stock is in very good condition and well maintained. We take a
proactive approach to asset management and target improvements to ensure that our
properties are SHQS and EESSH compliant. Properties are the subject of regular investment
to ensure they remain attractive and meet modern requirements and tenant expectations.
We have a range of planned maintenance programmes and undertake cyclical maintenance
which maximise the return on investment and ensure replacement is undertaken prior to
major reactive maintenance being required or condition deterioration. 
The Council has robust and comprehensive stock condition information. Stock condition
surveys are available for 96% of the housing stock with approximately 8% of our stock subject
to a full condition survey each year. 
The properties are selected based on type/ age and geographical location. Each property
survey assesses the internal and external aspects of the property alongside a minRDSap
energy survey. The survey is carried out by an external Chartered Surveyor and uploaded
from the surveyor’s handheld device to our asset management system APEX. The data is
validated internally by PMI staff, and each data set of property information is assessed for
compliance with the SHQS and EESSH. The System is also updated monthly with asset
improvements and major repairs completions to ensure that information is as accurate and
relevant as possible. Properties which fail the standards are highlighted and placed on
capital or major revenue improvement programmes. This information is also used to inform
the 30-year business plan and prepare planned and cyclical programmes of work. 
6.2 Performance & Governance 
To accurately track performance in relation to the maintenance and repair of the Council’s
housing stock, PMI and Housing Services report regularly to both internal and external
stakeholders including: 
• Housing Asset Management Board
• APSE
• Scottish Housing Regulator (SHR)
• Scottish Housing Network (SHN)
• Scottish Government 
The following approaches are incorporated into our working practices: 
• Robust performance monitoring and reporting through the Council’s performance
management system - Pentana
• Adopted a lean approach to construction design and management
• Strengthened project governance arrangements
• Embrace principles of modern procurement and supply chain management 
6.3 Housing Asset Management Board

Page 99

10
The Housing Asset Management Board (HAMB) was established in 2022 with a remit to
provide governance and accountability for expenditure from the Housing Revenue Account.
The HAMB comprises officer representatives from various Council services and covers the
following areas:
• Ensure that policies, procedures, and systems of work are established to comply with
all relevant legislation.
• Monitoring of financial spend across the HRA.
• Regularly review capital programme delivery.
• Escalation of key project decisions.
• Allow cross service discussion on issues relating to future programmes of work.
• Facilitate reporting to Scottish Housing regulator.
Key themes of the plan are also discussed and agreed at regular forums, including the Joint
Improvement Group and the quarterly Major Works Working Group.
The Council approves annual budgets for the work to be undertaken under this strategy and
set performance targets to enable monitoring of financial expenditure and service standards.
7. Legislation
7.1 Scottish Housing Quality Standard (SHQS)
All social housing in Scotland must comply with a minimum base standard known as the
Scottish Housing Quality Standard (SHQS). This standard is broken into five categories,
namely:
• Compliant with the Tolerable Standard.
• Free from serious disrepair.
• Energy efficient.
• Provided with modern facilities and services; and
• Healthy, safe and secure.
Definitions for each of the five criteria are contained in the Scottish Housing Quality Standard
Technical Guidance published by the Scottish Housing Regulator.
In April 2020, the SHQS was revised to demonstrate that in order to comply with compliance
elements 11 and 45, landlords must organise electrical safety inspections at intervals of no
more than five years in line with BS 7671:2018. This was a change from our previous cycle
of testing which was every 10 years and resulted in our SHQS compliance dropping from
99.09% in 2019 to 63.24% in 2022/23.
The appointment of a contractor to carry out the electrical testing of properties was issued in
March 2020, however due to the Covid pandemic and government guidelines, the
commencement of this contract was delayed, leading to a backlog of properties and we have
also experienced high volumes of properties failing to allow access for this essential work. To
address the difficulties in this area and achieve compliance, a working group has been
established and an improvement plan implemented. This includes working with our Housing
Colleagues to address areas of persistent no access and an ongoing social media campaign
to raise tenant awareness of the importance of this area.
Progress in this area is regularly reported to the statutory compliance working group, Council
Members and at the HAMB. The Scottish Housing Regulator is currently provided with a

Page 100

11
monthly update of our progress in this area and the processes being implemented to achieve
full compliance.
7.2 Energy Efficiency Standard for Social Housing (EESSH)
EESSH encourages landlords to improve the energy efficiency of social housing in Scotland
leading to reductions in energy consumption, fuel poverty and the emission of greenhouse
gases. An initial milestone of 31 Dec 2020 was set for EESSH compliance, and a further
milestone (EESSH 2) was set for Dec 2032 whereby all social housing in Scotland would
achieve an energy efficiency rating of EPC band B or above.
The Scottish Government’s recently published twenty-year vision for housing, Housing to
2040, sets out the commitment to adapt and retrofit existing homes to improve their energy
efficiency and decarbonise their heating, highlighting housing’s contribution to reducing
climate change emissions. The report recognised the need for a review of the EESSH target
to be carried out as part of the commitment to achieve net zero emissions.
In March 2021, the Zero Emissions Social Housing Taskforce (ZEST) was convened by the
then Minister for Local Government, Housing and Planning. It was asked to look at the
opportunities, barriers and solutions required of social housing to maximise its contribution to
the Scottish Government’s ambitious climate change targets. The report recommended that
review of the current EESSH guidance be brought forward. Part of this review is to agree new
milestones which are more closely aligned with the Scotland’s 2045 net zero emissions target.
The first meeting of the review group took place in September 2022 and is expected to
complete in 2023.
In direct response the Scottish Government issued further guidance on EESSH in October
2022 which:
• Placed a hold on the 2025 & 2032 milestones previously issued.
• Advised that during the review period landlords should continue with investment
programmes and prioritise a fabric first approach.
• Advised that external funding options be explored where possible to assist with
the delivery of investment programmes.
At 31 March 2023, 98.2% of North Ayrshire properties achieved or exceeded the EESSH
standard; however, it is recognised that considerable work will be required to achieve EESSH2
compliance in particular regarding options for decarbonisation of heat.
We continue to work towards this by implementing energy efficiency measures as part of the
Council’s capital programmes and are in the process of identifying an area suitable for a
pathfinder project where the properties involved will receive all necessary measures to
achieve expected EESSH 2 compliances. This pathfinder project will allow the collation and
analysis of real-life costs and performance information which will inform future business
planning.
In addition, a pilot programme was delivered to retrofit 500 Council owned homes with rooftop
solar photovoltaic (PV) systems. This programme supported delivery of financial savings and
reduce fuel poverty for tenants, reduce carbon emissions, and increase energy security.
Following the success of this pilot programme, solar PV is now installed on Council owned
homes as part of the planned annual re-roofing and rendering programmes. Solar PV systems
are also being installed at sheltered housing units as part of the refurbishment works

Page 101

12 
programme. Our external wall insulation programme is also being extended to ensure that
the maximum number of properties benefit from increased insulation which provides both an
energy efficiency measure and will provide benefit to our Tenants in reducing their heating
costs. 
Our new build programme is also key area in delivering energy efficiency measures, the new
homes being constructed utilise the latest energy efficient technologies including increased
levels of thermal insulation and air tightness, air source heat pumps and solar panels. 
7.3. New Housing Standard 
Sustainability performance is central to our specification for both new build and existing stock.
The Council’s standard specification for our new builds includes for enhanced building fabric
and Zero Direct Emissions (ZDE) heating solutions that go beyond the minimum requirement
of the current and recently updated Building Standards. 
The Scottish Government started consultation on the “New Housing Standard” in 2021, with
the aim to publish the draft standard in 2023, enact it in law and introduce it between 2025
and 2030. 
The new standard means that all homes (private and social) will have a legal duty to meet the
same minimum standard. All new build homes will have to meet a Scottish version of the
Passivhaus standard, meaning they will be highly energy efficient and well ventilated. This is
the biggest step yet in the push towards making sure that all new build homes are low carbon
and economical for tenants to heat. 
There will be no margins of tolerance, no exemptions and no “acceptable levels” of sub-
standard homes. The HAMP will be updated when the Scottish Government publish further
guidance on the “new Housing Standard”. 
8. Future Demands 
Despite the Council’s new build housing programme, most of North Ayrshire Council’s stock
comprises of housing built by former local authorities and the former Irvine Development
Corporation. The stock was built to comply with National Standards and Regulations and is
subject to ongoing programmes of repair, maintenance, and improvement. 
The Council has a record of substantial investment in its housing stock and has adopted an
incremental approach to major element renewal with a range of major renewal programmes
including roofs, external walls, windows, doors, insulation, heating, kitchens and bathrooms.
The criteria to prioritise elemental renewal work is based on factors such as age and condition.
This approach has ensured that funding has been accurately targeted where condition-based
need is greatest. The aim has been to achieve this same standard of condition for every house
in the stock. 
The Council also operates major revenue funded programmes of reactive and planned
maintenance to meet ongoing demand for repairs requested by tenants, repairs to void
properties and planned maintenance work. 
The key objective for the future is to achieve, for all major elements, ongoing life cycle
replacement programmes, designed to pre-empt element failure and to ensure continued
compliance with the SHQS, EESSH and future legislative requirements. This proactive
planned approach to stock investment ensures best value is achieved and reduces the
requirement for expensive response repairs.

Page 102

13 
However, there are several reasons why a property may cease to meet the Council’s strategic
requirements and may be considered for disposal. We will carry out an evaluation and
assessment of stock meeting these criteria and consider options for stock regeneration
programmes, including new build, refurbishment, demolition etc. 
Demand for Council Housing remains high, although it is recognised that there are areas of
unpopular stock. Work will continue to be undertaken to address the factors contributing to
demand for particular house types and areas and align with Council priorities. 
In the current economic climate, the delivery of new build properties, refurbishment projects
and cyclical capital and revenue investment programmes is becoming increasingly financially
challenging, and we need to balance project affordability and impact on future rent levels as
part of our HRA Business Planning process. 
8.1 Sheltered Housing Unit Refurbishment Programme 
The need for high quality, accessible housing for older people is recognised within the
Council’s ‘Older People’s Housing Strategy’. The Housing Revenue Account budget approved
by Council in December 2020 included the provision of a further £25m investment in our
Sheltered Housing Re-provisioning Programme. This allows us to continue improving our
sheltered housing portfolio and ensure Council complexes within North Ayrshire are high
quality, energy efficient and meet tenants’ needs and aspirations. 
Eleven properties not already refurbished or redeveloped through the SHIP were identified
and following a review of the property lifecycle data for these units, Barnett Court in
Saltcoats and Cheviot Court in Irvine were selected as the first two to be progressed. 
The programme involves the full refurbishment – including new heating systems, windows
and external doors, Solar PV's, CCTV installation, upgrading of the door entry system,
external works including external insulation if appropriate, additional car parking and EV
charging infrastructure. 
As of 2023 works have commenced at both Barnett Court and Cheviot Court with design
works progressing for the remaining units. 
8.2 Estate Based Regeneration Programme (EBRP) 
The Council has committed to investing £10 million in our housing estates between 2019-
2029. This investment is used to address issues which cause residents to become dissatisfied
with their local area. These issues can include insufficient parking, areas attracting anti-social
behaviour, or lack of green space. 
The investment programme seeks to provide communities where residents are proud to live
and to safeguard them for future generations. 
Recent examples of work undertaken by the EBRP include:
• Hayocks area, Stevenston – 27 additional parking bays to alleviate parking pressures
(Dec ‘22)

Page 103

14 
• Bimson Place, Irvine – Rear gardens cleared and fenced, low maintenance chips and
rotary dryers installed, and pathways upgraded. (Feb ‘23)
• Glass Fronted Closes, Irvine – 12 glass screens replaced, including installation of
ramped access and creation of bin storage areas. (July ‘23)
• Dirrans, Kilwinning – creation of in-curtilage parking to 26 properties to alleviate
parking pressures (Oct ‘22)
• Keppenburn Avenue, Fairlie – creation of in-curtilage parking to alleviate parking
pressures. (Feb ‘23)
The EBRP forms part of the Council’s wider approach to regeneration. The programme was
borne through an aspiration to further invest in our estates to address pockets of low demand
stock; antisocial behaviour; external appearance; parking provision; road and footpath
condition; fencing; landscaping; and general grounds maintenance issues. The proposed
projects can also assist with solutions for disrepair in mixed-tenure blocks. These blocks can
often be in poorer condition as some owners either cannot afford or are not willing to contribute
to common repairs. Further assistance in this area is provided by PMIs factoring team who
engage with owners within these blocks to facilitate common repairs. 
The EBRP programme is developed in partnership with our tenants and consultation exercises
are carried out as appropriate. 
8.3 Multi Story Blocks 
In June 2018, the Council’s Cabinet approved the demolition of the Fullarton Tower Blocks in
Irvine and for the major refurbishment of the Saltcoats Tower Blocks. As of August 2023, the
demolition of the Fullarton Blocks is progressing well and expected to complete in late 2023.
Once cleared this site, will be passed to the SHIP programme to provide new build housing
consisting of general needs housing, amenity bungalows and accessible homes. 
Refurbishment works at Saltcoats, with an expected investment value of £2.25m, are expected
to complete late 2023 and have provided the residents with internal and external refurbishment
including upgraded central heating, rewiring and installation of a fire suppression system. The
final stage of the refurbishment will be the replacement of the lifts in the two blocks. This will
commence during 2023/24 which will further ensure the longevity of the blocks. 
8.4 New Build Housing 
In-line with North Ayrshire Council’s Strategic Housing Investment Plan 2024-29 we continue
to design, develop and deliver a new supply of affordable and sustainable housing for rent.
The Council's current housing development programme is on target to deliver a committed
1625 new homes by March 2029. 
The table below outlines new housing supply that has been developed or is in the process of
being developed by the Council: 
Project Completion
Date
No. of
Homes
Housing Mix
Vennel Gardens, Irvine 2015 16 Sheltered Housing Unit
Stevenston Institute, Largs 2015 11 Amenity Flats
Dickson Drive Phase1, Irvine 2015 8 General Needs Homes &
Amenity Bungalows
Montgomerie Court, Kilbirnie 2016 24 Sheltered Housing Unit &
Amenity Bungalows

Page 104

15 
Fencedyke, Irvine 2017 35 General Needs & Amenity
Homes
Glencairn House, Stevenston 2018 28 Sheltered Housing Unit
Kyleshill Court, Saltcoats 2019 36 Sheltered Housing Unit
Ardrossan Road, Seamill 2019 31 General Needs Homes &
Amenity Flats
Dickson Drive Phase 2, Irvine 2020 24 General Needs, Amenity and
Wheelchair Liveable Homes
Dalrymple Place, Irvine 2021 33 Sheltered Housing Unit and
Amenity Bungalows
Flatt Road, Largs 2021 123 Wheelchair, amenity and
general needs homes,
sheltered housing unit and
supported living unit
St Beya Gardens, Millport 2021 18 General Needs, Amenity and
Wheelchair Liveable Homes
Springvale Place, Saltcoats 2021 14 General Needs, Amenity and
Wheelchair Liveable Homes
Towerlands, Irvine 2022 50 General Needs, Amenity and
Wheelchair Liveable Homes
Brathwic Terrace, Arran 2022 34 General Needs, Amenity and
Wheelchair Liveable Homes
St Colm’s Place, Largs 2022 29 Sheltered Housing Unit
St Michael’s Wynd, Kilwinning 2022 79 Wheelchair, amenity and
general needs homes,
sheltered housing unit and
supported living unit
Harbourside, Irvine 2023 71 Sheltered housing unit,
wheelchair, amenity and
general needs homes
Caley Court, Stevenston 2023 16 Supported living
accommodation
Afton Court, Stevenston 2023 6 Amenity bungalows
Former Largs Police Station,
Largs
2023 12 Amenity flats
Ayrshire Central, Irvine 2027 202 General Needs, Amenity and
Wheelchair Liveable Homes
Montgomerie Park, Irvine 2027 189 General Needs, Amenity and
Wheelchair Liveable Homes
Former Garnock Academy,
Kilbirnie
2025 50 General Needs, Amenity and
Wheelchair Liveable Homes
Corsehillhead, Kilwinning 2025 7 Amenity and General Needs
Homes
Former James Reid School,
Saltcoats
2025 47 General Needs, Amenity and
Wheelchair Liveable Homes
Former Stanecastle School,
Irvine
2025 31 General Needs, Amenity and
Wheelchair Liveable Homes
Former James McFarlane
School, Ardrossan
2025 19 General Needs, Amenity and
Wheelchair Liveable Homes
Kings Arms, Irvine 2025 6 Amenity Flats
Fullerton Street, Irvine 2026 50 General Needs, Amenity and
Wheelchair Liveable Homes

Page 105

16
Bourtreehill Village, Irvine 2028 32 General Needs, Amenity and
Wheelchair Liveable Homes
Laburnum Avenue &
Newhouse Drive
2025 14 Amenity and General Needs
Homes
Refurbishment Project 8 2026 2 TBC
Regeneration Project 1e 2027 7 TBC
Regeneration Project 1d 2027 36 TBC
Unallocated Regeneration
Block 1
2027 30 TBC
Glebe Pace 2028 8 TBC
8.5 Island Housing
The Council is committed to supporting our island communities. 18 new homes were
completed on the Isle of Cumbrae during summer 2021. The site provided a mixture of
general needs houses, amenity bungalows and homes for wheelchair users.
The Council also completed 34 new homes at Brathwic Terrace on the Isle of Arran during
June 2022. The site provided a mixture of general needs houses, amenity bungalows and
homes for wheelchair users.
Island properties are subject to the same asset management approach as mainland
properties, with reactive and annual maintenance being the responsibility of Building
Services who have emergency arrangements in place with local island-based contractors.
These developments, alongside work with communities on the island, are anticipated to
stimulate investment in other infrastructure (transport, marine, digital) to encourage
economic growth. An Arran Housing Task Force has been established to support an
evidence-based assessment of demand for affordable housing on Arran. The assessment is
being undertaken by Northstar Consulting, in consultation with all affected parties, with
results expected late 2023. Thereafter, an action plan will be established to address the
outcomes of the assessment and any other recommendations made.
9. PMI Support services
9.1 Tenant Alterations & Improvements
The Council will allow tenants to carry out some alterations to their homes provided they have
sought our permission. Tenants must apply in advance, providing details of proposed works.
This covers any changes that they may wish to make to the inside of their home, decorating
of the outside or erecting any structures in the outside space. No permission is required for
minor decoration within the property.
Consent will not be unreasonably withheld provided the works comply with all relevant
standards. Tenants are also required to apply for any necessary statutory approvals. If tenants
remove any fixtures or carry out works without permission, they may be required to apply for
retrospective permission or in some instances restore them to the original condition. Where
a tenant is unwilling or unable to carry this out, they may be recharged for any costs associated
with restoring the property to its original condition.
9.2 Medical Adaptations
One of the Council’s main aims is to promote independent living and to ensure that tenants
can reside in their home for as long as possible.

Page 106

17 
The Council carries out alterations to tenanted properties to improve the quality of life of elderly
or disabled tenants. Tenants requesting alterations will have their needs assessed by an
HSCP Occupational Therapist, who will recommend the necessary alterations. The Council
will seek to carry out adaptations in order of priority as agreed with the Occupational Therapist
and as quickly as possible subject to available funding.
Adaptations can be low cost and minor (handrails and shower seats) or more extensive
(ramps, extensions, wet rooms). PMI assist in the delivery of the adaptations programme by
providing architectural support to HSCP to assist with the delivery of larger scale and more
complex adaptations to council properties.
Where appropriate design features are incorporated in new build and refurbished properties
that ensure homes are easily adapted should a resident’s circumstances change over time.
9.3 Asbestos Management
Asbestos containing materials were widely used in the construction industry prior to the year
2000. Any housing stock built or refurbished before this date may have asbestos containing
materials within its construction.
North Ayrshire Council is committed to managing work activities involving asbestos
containing materials to reduce the likelihood of asbestos fibres becoming airborne. Where
any construction works are carried out on behalf of North Ayrshire Council within the housing
stock, that building is deemed a workplace under the Health and Safety at Work Act. These
work activities are therefore subject to health and safety legislation including the Control of
Asbestos Regulations 2012.
It is current policy at North Ayrshire Council that no Council employee will work on any
asbestos containing materials. Where asbestos containing materials are identified the
Council will arrange for a specialist contractor to carry out removal or other appropriate work.
This applies to both licensed and non-licensed asbestos work as defined by the Health and
Safety Executive.
North Ayrshire Council uses an electronic database for recording its housing assets
asbestos information. Access to this database can be provided securely to contractors
ensuring safe working practices.
North Ayrshire Council appoints competent UKAS accredited contractors to conduct surveys.
• Management Survey: The purpose of the management survey is to manage
asbestos-containing materials (ACM) during the normal occupation and use of
premises.
• Refurbishment / Demolition Survey: The refurbishment / demolition survey is required
where the premises, or part of it, need upgrading, refurbishment, or demolition.
It is Council policy to carry out management surveys on all Council housing stock, however
this may not always be possible due to access difficulties.
Currently the Council has asbestos information recorded for 98% of its housing stock with
154 no accesses. These figures include 860 post 2000 builds which will not contain ACMs.
Refurbishment surveys are carried out whenever they are required by UKAS accredited
surveyors and are specific to the scope of works, these surveys are all available on the
asbestos database.
Management plans are available for all common areas within the housing stock as per
Health and Safety Executive recommendations. These plans are updated annually following
a running programme of re inspection. Currently North Ayrshire Council has 387 internal

Page 107

18 
common areas all of which are surveyed, of these 147 have asbestos containing materials
identified and are included in the re-inspection programme.
9.4 Property Factoring
The previous Right to Buy legislation led to the sale of approximately 12,000 homes to sitting
Council tenants. Approximately 1,413 of these properties share communal parts with other
properties. Typical examples would include flats and four-in-a-block style houses. 
At the time of selling these properties, the Council retained legal rights and responsibilities in
relation to the management and maintenance of the communal part. The Council has the legal
entity of being the Property Factor to enable it to perform these duties. 
The Property Factors (Scotland) Act 2011(the Act) aims to protect homeowners by providing
minimum standards for Property Factors. All provisions of the Act came into force on 1 October
2012 and apply to all residential property and land managers whether they are private sector
businesses, Local Authorities or housing associations. 
The Act has three main elements: 
• A compulsory register of all property factors operating in Scotland
• A code of conduct that sets out minimum standards of practice with which all
registered property factors must comply
• A new route for redress: the Housing & Property Chambers First Tier Tribunal.
Homeowners will be able to apply to the tribunal if they believe that their factor
has failed to comply with the code of conduct or otherwise failed to carry out
their factoring duties. 
To comply with the terms of the Act, the Council employs a dedicated property Factoring
Team. 
The Factoring Team has developed and implemented the processes required to comply with
the terms of the Act and issued a ‘Statement of Services’ to the 1,413 factored owners within
Council managed housing estates. 
Future development of the Factoring Service is a key action as it will improve the service
provided to the owners of our factored properties as well as generating future revenue income
for the Council. 
The Factoring Team handle a number of enquiries annually with referrals being received from
multiple sources including, but not limited to, homeowners and tenants, the Housing Repairs
line and Building Services Inspection Unit. During 2022, the Team recorded approximately
276 approaches and year to date in 2023 have recorded approximately 197 enquiries. Most
cases raised lead to the completion of essential repairs. Please note that these figures do not
consider approaches for general advice and assistance. In financial year 2022-2023, a total
of 180 owners were invoiced for repairs to a total value of £135,432.50 (including
administration fee & VAT). 
A successful Factoring Service provides a framework for improving the management of
common or shared parts of owner-occupied properties and provides the opportunity for the
Council and owner occupiers to communicate effectively in relation to future planned
maintenance work and potential energy efficiency projects.

Page 108

19 
The Scottish Government are currently in the process of reviewing the role of Property Factors
across the sector and have established three key areas for change. Proposals are currently
in early stages of development however may lead to significant development of the Factoring
Service in future years. 
10. Financial Summary 
All work carried out on the Council’s housing assets are funded from the Housing Revenue
Account or the Housing Capital Programme. Funds are obtained from a number of sources
principally rents from dwellings, which is in the region of £52.63m per annum, and other
income of approx. £0.563m is received from commercial interests in retail units and lock-up
garages. Capital receipts are also received through the sale of HRA assets amounting to
£0.224m in the period 2018-2023. 
Although the Council’s housing stock is in very good condition, investment is required to
ensure that it continues to perform as an effective asset. A 30-year Business Plan has been
developed to ensure that the appropriate level of funding is available to finance repairs and
investment to all stock. Each year future expenditure, including maintenance and investment
requirements are reviewed. The 30-year business plan is updated to determine required levels
of income required over the period of the plan. Various stakeholders are consulted on the
updated business plan. Tenants are consulted on rent proposals before the feedback and
report are provided to Council for consideration. 
The current Business Plan projects future investment to March 2053. It is reviewed annually
to ensure that all work continues to support the Council’s priorities and is based on the latest
appropriate condition survey information. Additional factors such as the cost of living and
pressures on rent income are considered during the development of the Business Plan. 
The investment costs for the period between April 2023 and March 2024 and projected
investment costs identified for the period between 2024 and 2054 are detailed below. These
costs include all anticipated works required to ensure that properties are maintained at or
above the required standards. 
Projected investment required during period April 2023 to March 2054: 
Cost Category 2023/24 2024/28 2028/33 2023/53 TOTAL
Improvements to
Existing Stock  29,009,490  83,951,435  98,769,118  943,224,495  1,177,957,830 
New Build Projects  116,132,786  53,828,232  -  -  169,961,018 
Void Costs  3,559,098  14,867,804  17,037,622  119,360,869  158,803,668 
Responsive Repairs  7,978,432  34,322,777  39,365,069  276,448,485  367,302,368
Planned & Cyclical
Maintenance  5,090,728  22,071,766  26,434,714  199,665,337  259,216,843
Infrastructure
Improvements  273,750  1,180,550  1,367,101  9,864,327  13,003,179

Page 109

20 
Aids & Adaptations  1,617,464  6,972,104  8,059,205  57,859,950  76,381,923 
Total  163,661,748  217,194,668  191,032,829  1,606,423,463  2,222,626,829 
11. Risk Management
The Council is committed to adopting best practice in the identification, evaluation, and cost
control of all risks to ensure that they are eliminated or reduced to an acceptable level.
At both strategic and operational levels, the Council recognises that the management of its
housing stock does have several identifiable risks.
• Building cost inflation and rising tender prices
• Shortages of materials and supply chain issues
• Capacity within the construction industry
• Technology changes, particularly in relation to heating options
• Impact of future legislative changes
To mitigate risks, several key controls have been developed. These are summarised as
follows:
• Major new build Projects 
The SHIP project board has been created to oversee the preparation, review, financial
management and overall delivery and implementation of the Council’s housing
development programme. The Board will be the final decision makers in terms of
priority, budget (including approval of additional spend), site housing matrix and design
concept sign off for each project site.
• Major Capital Projects 
These projects have dedicated monthly project boards and are reported bi-monthly to
the Housing Asset Management Board (HAMB), where issues of concern and risk
mitigation are standard agenda items.
The operational aspects of major capital projects are also reported and any risks
relating to the delivery are discussed.
• Other Major Works and Revenue Repair Projects 
The operational aspects of other major works and revenue repair projects are reported
monthly to the HAMB, with a risk register being maintained and reviewed as part of
this process.
• Dedicated professional technical staff.
• Ongoing and progressive training
Over-arching key risk and mitigations are noted below: 
Key Asset Risk Mitigation(s)
Ageing asset stock impacting
on condition
• Cyclical condition surveys
• Cyclical component replacement programmes
• New build programme (SHIP)

Page 110

21
• SHU refurbishment programme
• Saltcoats High Flats refurbishment programme
• Responsive repairs service
Statutory Compliance /
Safety
• Statutory compliance programmes (Gas safety /
EICR / Smoke detection upgrade)
• Governance and reporting procedures (HAM
Board, Annual Return on the Charter, Cabinet
reporting).
• Responsive repairs service
• Resource structure within PMI team being
reviewed
• Process for gaining access to people’s homes
being reviewed
• Condensation Damp and Mould Stategy and
reviews process being developed
• Statutory compliance working group established
Climate Emergency / EEESH
/ EESH2
• Council’s Sustainability and Climate Change
Strategy
• Whole house energy efficiency pilot project
• Energy Efficiency investment programmes
• New build programme (SHIP)
Investment requirements
exceeding budget availability
• Best value procurement of external contractors
• Long term business planning model and rent-
setting
• Governance and reporting procedures (SHIP
Board, HAM Board, cabinet etc.)
Increasing regulatory
demands
• Engagement with Information networks (APSE /
ALACHO / SHOPs etc.)
• Long term business planning model and rent-
setting
Staff resource to respond to
increasing demands
• Resource structure within PMI team being
reviewed
• Process for gaining access to people’s homes
being reviewed
• Staff training and development
Systemic issues within
construction industry supply
chains
• Quality standards within tender documents to
ensure appropriate contractors are appointed
• Governance and reporting procedures (SHIP
Board, HAM Board, cabinet etc.)
Uninsured perils • Risk based assessment on identified properties ie
subsidence.
12. Insurance
The Council’s housing assets are insured with a reputable insurer with considerable
experience in local authority insurance. The Council is committed to adopting best practices
in the identification, evaluation, and cost control of all risks to ensure that they are eliminated
or reduced to an acceptable level.
Subsidence material damage to properties is not covered by our insurers and the Council are
self-insured and handle subsidence related housing stock repairs from the HRA. There is also
an excess that the Council must pay for each insured risk.

Page 111

22 
As a result of the insurance exclusion for subsidence the Council aims to mitigate the risk
through the correct management of dwellings known to be at risk of subsidence. PMI are
working towards development of a process for the risk-based assessment of stock identified
to be within subsidence areas or identified through condition survey. This will require allocation
of a dedicated budget to allow mitigation of future risk. 
13. Action Plan 
The contents of the HAMP demonstrate that the Council is committed to providing high quality,
affordable houses for rent that not only meet the standards of SHQS and EESSH/EESSH2
but meet the expectations of tenants and user groups. 
To deliver the objectives of the 2023-2028 HAMP, an Action Plan is set out below. The Action
Plan covers a three-year period, from 2023-2026 and will be updated annually to take account
of the successful completion of actions. It is also intended that on an annual basis, new action
will be added, to reflect changes in over-arching objectives or changes brought about through
legislation. 
The Action Plan has been prepared to ensure that the key themes contained within the HAMP
are translated into deliverable objectives that can be reported and monitored on a quarterly
basis. 
Progress against the HAMP Action Plan will be reported at the Housing Asset Management
Board (HAMB) and escalated as appropriate to the Executive Director (Place)/Executive
Leadership Team.

Page 112

23 
2023 - 2028 Action Plan
The following actions have been identified as the Housing Asset Management Plan
improvement actions for 2023-28 and will be recorded on the Council’s performance
management system, Pentana. 
HAMP
Action Ref
Action Desired
Outcome
Lead Timescale
Strategic actions
HAMP_S01 Review Governance PMI March 2024 
governance arrangements   
arrangements remain robust   
relating to asset and fit for   
management purpose.   
including the role   
of officer groups,   
elected members   
and tenant   
representatives to   
ensure that   
strategic asset   
management   
reflects best   
practice.   
HAMP_S02 Review Accuracy of PMI Ongoing 
information asset   
management information is   
systems to ensure maintained.   
a comprehensive   
understanding of   
all assets is   
gathered, stored,   
accessed and   
analysed   
appropriately.   
HAMP_S03 Review existing Provision of PMI Ongoing 
asset accurate   
management information to   
approach to inform HRA   
ensure information Business Plan   
is used and ensure   
appropriately to robust   
influence decision   
investment making   
decisions and process.   
future asset   
management   
strategies.

Page 113

24 
HAMP_S04 Review
performance
indicators to
ensure framework
reflects a robust
system of financial
management and
achieves value for
money.
Realistic and
measurable
outcomes are
recorded and
benchmarked.
PMI March 2024
HAMP_S05 Review workforce
planning in
relation to skills,
experience,
training and
knowledge across
all relevant
stakeholders in
the asset
management
process.
Asset team is
fit for purpose,
well trained
and engaged.
PMI March 2024
HAMP_S06 Review stock
profile, condition
information and
asset lifespan
considerations to
inform future
priorities and
programmes in
relation to stock
redevelopment
and regeneration
To take a
strategic asset
management
approach to
the future
stock profile.
PMI March 2024
HAMP_S08 Develop
pathfinder project
to inform longer
term investment
decisions to
deliver EESSH2
compliance.
Informed
decision
making in the
area of
retrofitting
sustainability
elements.
PMI March 2025
HAMP_S09 Expand
decarbonisation
strategies to
ensure all
investment aligns
with local and
national priorities /
targets.
Addressing
climate
emergency /
zero carbon
agenda.
PMI /
Sustainability
Ongoing

Page 114

25 
HAMP
Action Ref
Action Desired
Outcome
Lead Timescale
Operational Actions
HAMP_A01 Ensure compliance
with SHQS
(excluding
exemptions and
abeyances) with a
particular focus on
Electrical Installation
Condition Reports
(EICR) compliance.
100%
SHQS
complianc
e.
PMI Ongoing
HAMP_A02 Ensure compliance
with EESSH/2
(excluding
exemptions and
abeyances).
100%
EESS2
complianc
e.
PMI Ongoing
HAMP_A03 Work with Housing
Services to develop
and deliver SHU
refurbishment
projects.
Completio
n of SHU
refurbish
ment
projects.
PMI 2028/29
HAMP_A04 Work with Housing
Services to develop
and deliver projects
within the Strategic
Housing Investment
Plan.
Completio
n of SHIP
projects.
PMI Ongoing
HAMP_A05 Continue to develop
factoring service and
encourage owner
occupier uptake with
major planned and
capital investment
works.
Delivery
of an
effective
Factoring
Service.
PMI Ongoing
HAMP_A06 Continue with the
annual programme
of percentage stock
condition surveys
and upload all
necessary attributes,
condition, life
Continue
a regular
programm
e of stock
condition
surveys.
PMI Ongoing – 8 % of
Stock targeted per
annum

Page 115

26
expectancy and cost
information to the
Asset Management
System (Apex).
HAMP_A07 Work with Housing Deliver PMI
Services to develop the
and deliver projects annual
contained within the
Estate Based
EBRP. Ongoing.
Regeneration 10-
year Programme.

Page 116

ASSET MANAGEMENT PLAN 
ICT

Page 117

2
1. Introduction
This ICT (Information and Communications Technology) Asset Management Plan 2021-2024
supersedes the previous 2018 – 2021 Asset Management Plan. As per the previous Plan, this
new plan is linked to the ICT Technology Strategy and will depict the impact on hardware,
software, and application assets. North Ayrshire Council’s approach to Asset Management
Planning is based on the guidance given by CIPFA.
In relation to Governance the Information Technology Manager is responsible for
management and control of the Asset Management Plan which will be reviewed annually. The
Architecture Board acts as the assessment body for all IT investment and change. The ICT
Asset Management Plan outlines the Council’s approach to Asset Management and how this
links with the Technology Strategy.
2. Aims & Objectives
Council Plan
The importance of Asset Management is evident in the Council Plan 2023-28 Priorities
Priority – Wellbeing
Key Activities
• Improving educational attainment and achievement and closing the attainment gap.
Priority – Climate Change
Key Activities
• Reducing the carbon footprint of our estate through rationalisation
Priority - A Sustainable Council
Key Activities
• Driving change and transformation, using technology where appropriate, to deliver efficient
and effective services and support delivery of priorities.
• Maximising value from the use of our assets.
• Focusing our investment on priorities.
• Using dynamic data and lived experiences to inform decision-making.
3. Asset Types
All ICT asset types have, to some extent, clearly defined strategies for their delivery and
management which are summarised within this document along with high level commentary
regarding the asset base.
The asset base and scope of this document includes:
• End User Devices: PCs; Laptops; Mobile Phones
• Data Centre Technology: Server Hardware; Storage Hardware; Switch
Hardware; Firewall Hardware
• Network Technology: Data Switches & Routers; Wireless Access Points
• Software – Key Software and Applications

Page 118

3
4. Review of ICT Asset Management Plan 2018 – 2021
Provides an overview on progress on activities/approaches included within the
previous ICT (Information and Communications Technology) Asset Management Plan
The last three years has seen some significant changes to, progress in and challenges for the
way in which IT assets are deployed, developed, and utilised. The key aspects have been:
• The previous strategy of rolling out Virtual Desktop Infrastructure (VDI) which centralised
control of devices and helped prolong the life of desktop devices is no longer a fit for
purpose approach.
• There is a need to standardise desktop devices on the latest operating system version
(currently Windows 11) to ensure security, performance and improve ease of
management. This has seen a large-scale programme of replacement of older devices.
• The Council agreed the significant move to and investment in the Microsoft M365 suite of
products which provides a vast array of collaborative software and tools. Significantly,
migration away from Lotus Notes and Sametime to Outlook email and Teams has provided
opportunity for improved ways of working. Additionally, migration of file storage away from
network drives to Sharepoint will provide huge benefits in the way files are created, worked
on and stored, and will allow improvement in information management.
• 2020 saw the world hit by the COVID Pandemic with the resultant impact on the way the
Council conducts business. This has brought new challenges to how IT is delivered and
utilised. A significant change in direction has been required, with more people working
from home. Home working became the norm due to being compulsory for most staff. This
dramatic move to home working is unlikely to reverse as the Pandemic eases and most
staff have indicated the desire to continue some form of home or blended working. Going
forward, agile working rather than office desk-based working will become the norm. IT
Services has already started on the journey of supporting this future vision.
• A complete review of IT Infrastructure was completed, funds approved, and tender
exercise carried out. The outcome is a complete upgrade and refresh of Wide Area
Network (WAN), Local Area Network & WiFi (LAN & WiFi), and Telephony.
• A review of devices used in Education has been conducted which highlighted that around
70% of the desktop estate is ageing and requires replacement and that little or no disposal
of older devices is carried out. An operational group has been set up between IT Services
and Education to take forward actions resulting from the review, improve best practice
procedures and review asset management and disposal. An Education ICT capital
programme has been established to enable device refresh.
5. Activities/Approach identified in ICT Asset Management Plan 2018 – 2021
5.1 People at the Core
Deliver first class technical solutions built around the needs of our customers and
people.
The technology that IT Services introduce will be designed in partnership with Services across
the Council and will support business processes, service delivery and collaboration. ICT
assets will be aligned to the needs of the Council’s workforce, moving to more unified
applications and to single standardised devices.

Page 119

4 
5.1.1 Progress up to 2021
• Staff remote access to key systems maintained and improved.
• Provision of suitable desktop hardware for remote/home working.
• Enhancements put in place to support and automate device updates to ensure our estate
remains compliant and patched to the highest level - secure and robust devices enhance
agile working.
• Provision of additional mobile phones.
5.1.2 Future Focus for 2021 - 2024
• Enhance support for home/remote workforce.
• Investment in device replacement to support continued mobile/remote working.
• Deployment of softphone functionality and reduction in the number of desktop handsets. 
5.2 Anytime Anywhere Access
Enable colleagues to access the systems applications and information they need
wherever they are
The Council workforce must be able to access the systems and applications they need, to
support the community in the most efficient way possible. IT Services will drive the
transformation of the personal computer (PC) device estate of 2700 to a simplified, consistent
technology model known as virtual desktop infrastructure (VDI). To complement this
technology, IT Services will introduce a device loan system. This will enable procurement of
the right type and number of mobile devices. Over time, surplus devices will be removed to
support concurrent usage rather than the more traditional one device per person model.
5.2.1 Progress up to 2021
• VDI has been a useful solution however, a review of this technology combined with the
covid-driven need to work more agilely, has led to implementation of an alternative
technology with improved user experience.
• Investment in the Desktop estate to replace older models and support a move to Laptops
rather than PCs (Personal Computer).
5.2.2 Future Focus for 2021 - 2024
• Ongoing investment in the Laptop / Desktop estate through the PC Replacement capital
programme, refreshing hardware and standardising on the latest operating system.
• Migrate users away from VDI to Always on VPN (AoVPN) providing improved and
simplified remote access technology to support hybrid and remote working. VDI will only
be used as an exception and where necessary. 
5.3 Cloud First
Utilise cloud-based technologies where appropriate - new cloud-based systems should
be considered provided they represent good value.
Migrating the Council’s business application and software assets to the cloud would
significantly reduce the requirement for physical server hardware and storage at the Council’s
primary and business continuity sites. Business applications hosted in the cloud will be highly
available and business continuity will be seamless.

Page 120

5
Cloud adoption will necessitate the transformation of the ICT network from a traditional design
to an internet centric network which will be more scalable and more sustainable.
5.3.1 Progress up to 2021
• Exploration of cloud options with a Move to Cloud where appropriate approach.
5.3.2 Future Focus for 2021 - 2024
• Continued implementation of M365 and Sharepoint
• Implementation of a new Cloud IT Service Management system (ITSM)
• Implementation of a Cloud managed WiFi solution.
• Implementation of a Cloud-ready Telephony solution.
5.4 Data Driven
The insight gained from data analytics will support service delivery and inform how we
manage ICT technology assets.
Making use of data and technology for transformational change to provide insights and
solutions to enable the Council to improve efficiency, reduce costs, and make data-driven
decisions, resulting in better outcomes for our citizens.
5.4.1 Progress up to 2021
• IT asset and user management suite built using Power BI and data from SCCM (Microsoft
System Centre Configuration Manager), Azure API, Active Directory and Chris21
• Data and information platform built on SharePoint and Power BI to report on: Workforce
information, Finance information and Streetscene performance.
• Integration built between Chris21, Active Directory and M365 using FME to allow quick
and accurate maintenance of user account and the data held within them.
• Implemented new Connects Intranet for staff based on MS Sharepoint platform.
5.4.2 Future Focus for 2021 - 2024
• Continue to leverage investment in PowerBi for provision of Management Information (MI)
and reports to assist with service provision, review, and enhancement.
• Enhancement and development of NAC (North Ayrshire Council) website to provide
customers with improved channels of access to Council services.
5.5 Secure
Operate securely whilst still taking advantage of technological innovations and
opportunities.
Cyber security is paramount for the Council, and we take a proactive approach to protecting
assets while also being prepared to respond to any security incidents which may have an
impact upon them.
5.5.1 Progress up to 2021
• Improved security controls implemented to protect assets include the deployment of
Sophos Central Anti-Malware software, monthly vulnerability management scanning &
resolution processes, and the introduction of new user authentication methods such as
passphrases and multi-factor authentication.

Page 121

6
• Training, awareness, and governance methods have all been revised to ensure the
development of a healthy security culture at all levels of the organisation.
5.5.2 Future Focus for 2021 - 2024
• Options to establish a Security Operations Centre (SOC) function capable of detecting and
responding to security events have been explored, a business case completed and to be
progressed with budget being identified.
• Improved Business Continuity and Cyber Incident Management plans and processes
implemented and tested to ensure staff and Services can deal with major incidents.
• Continuous focus on technologies, processes, techniques, and staff training to counter the
ever-present threat of sophisticated cyber-attacks.
6. Overview and List of our Key ICT Assets
ICT assets, used by over 6,500 staff and around 22,000 school pupils, are displayed in
the tables below.
Asset (Hardware) Nos
Estate
Replacement
Value
Refresh & Replacement Method of Monitoring
PCs & Laptops
3,000
Corporate
9,500
Education
12,500 Total
£4.87M
Desktop Replacement
Programme
Education ICT
Replacement Programme
Microsoft System Centre
Configuration
Manager (SCCM) and Intune
are used to monitor and
manage devices. In addition,
Education & Skills
monitor devices by inventory
at school level
Tablets/iPads
(Education) 3385 £820K
Schools iPads are managed
via a central
console using Airwatch
mobile device management
and inventories are held at
individual schools.
Servers & Storage 40 £800K
Virtualised server
technology is in place
decreasing the number
of physical servers
required.
VMWare and CommVault
management tools
Microsoft SCCM software
SolarWinds monitoring
software.
Contract reviews
LAN (Local Area
Network) Switches
WiFi Access Points
500
1000
£1.0M
£300K
Contract
in place for replacement and
upgrade of Local Area
Network (LAN) hardware
and WiFi Solution
Asset monitoring and
maintenance using Extreme
XiQ management tools and
SolarWinds monitoring
software.
Contract reviews
Mobile Phones / Smart
phones 2900 £600K
Contract in
place with Vodafone for mob
ile and smart phones
Vodafone Online Account

Page 122

7
IPT Telephony
Handsets 1200 £230K Contract in place for Fixed
Voice / IPT Cisco Call manager (CUCM)
Printers (MFDs -
(Multifunctional
Devices))
Maintained
by Services
MFDs are on
lease
agreement
Devices are leased by
individual Services. Contract
in place with RICOH
RICOH provided account
information
Asset (Software) Nos Estate Replacement
Value
Refresh &
Replacement
Method of
Monitoring
Microsoft Licences (Corporate)
M365 - 3,109 E3
Licences: Corporate
Staff
M365 -1320 F3
Licences: Care at
Home Staff
£590K/annum
£74k/annum
Ongoing Microsoft
M365 agreement
MS Licence
database
Microsoft Licences (Education)
A365: 1,866 Staff and
22,000 Pupils £92K/annum Ongoing Microsoft
Campus agreement
MS Licence
database
Asset (Rentals) Nos Annual Rental
Cost
Refresh &
Replacement
Method of
Monitoring
Data Circuits 190 £440K/annum
Contract in place for
replacement and
upgrade of Wide
Area Network
(WAN) data circuits
Capita Managed
Service
7. Current Asset Management Performance/Drivers for Change
7.1 How we manage our ICT Assets
Outlines how we manage our ICT assets and associated infrastructure.
7.1.1 Inventory Performance
Microsoft System Centre Configuration Manager (SCCM) and Intune management tools are
used for the inventory management and performance monitoring of the corporate and
Education personal computer devices and servers. Solar Winds is used to monitor the
performance of core network Infrastructure. Apple Airwatch is used to manage the education
estate of iPads.
7.1.2 Lifecycle Planning.
IT Services will ensure that new assets are sustainable and affordable, within agreed
budgets, for the whole life of the assets. Roadmaps and replacement plans will be
developed for ICT assets in support of continuous improvement and efficiency. IT Services
will assist services with retiral and disposal of ICT assets, thereby complying with legislative
and operational requirements.
7.1.3 Manage the Risks.
As our assets become older, increased resource is required to maintain them and there is an
increased risk of incompatibility and performance issues occurring. Furthermore, the impact
of maintaining old equipment not only increases the total cost of ownership but impedes the

Page 123

8 
ability to support service delivery and continuous improvement. A programme of on-going
maintenance and replacement of ICT assets is required to mitigate these risks.
7.1.4 Support & Maintain.
Currently the council’s laptop and desktop estate are managed using SCCM and Intune for
Windows 10 devices and smartphones, these tools ensure appropriate windows updates are
applied, also configuration or software changes can be pushed to our devices from these
tools ensuring we remain compliant.
7.1.5 Refresh and Replace.
Capital planning within the Council has a 10 Year horizon and IT Services must consider this
timescale in looking at plans, aspirations, and technologies.
IT Hardware and Software typically has a 3 to 5-year period of change given the speed of
development in the world of technology. Planning for desktop device replacement is based
on a 5-year cycle. Networking and Telephony is reviewed regularly and typically has a 5 to
7year cycle. 
8. Asset Management – Key Focus
8.1 Comprehensive asset management information is collected, maintained, readily
available and stored efficiently.
The Council’s IT service management system (ITSM) should be the central data store for
ICT asset management information. The system should be accessed and maintained by all
ICT staff. It should be integrated with desktop management tool/s to maintain
comprehensive information regarding hardware specification and software installed on the
PC and laptop estate.
Samanage / Solar Winds ITSM – end of life and requires to be replaced.
Information is identified and maintained relating to system lifecycles and replacement plans
roadmaps.
All business applications were assessed in terms of functionality, performance, availability,
and resilience during the 2018 Applications Review.
A programme of contract review and potential re-procurement is carried out in conjunction
with Procurement Services
8.2 Centralising purchasing and supply contracts for hardware and standard software.
All IT hardware and software is purchased through or in consultation with ICT. A central list
of all ICT contracts is maintained, and specific budgets identified for hardware and software
annual licence, support, and maintenance costs.
8.3 Exploiting appropriate e-Procurement, legal and framework agreements for
hardware and software.
Scottish and UK procurement frameworks used whenever they are available and provide
best value. Most hardware is purchased from Scottish Government framework agreements
including PCs, Laptops, Tablets and Mobile Phones.

Page 124

9
8.4 Ensure all new hardware and software is thoroughly tested to ensure technical
and operational compliance.
Roles and responsibilities are divided between Customer Support and Operational teams.
Standard change management processes are in place to ensure that all significant changes
to the live operational environment are tested and approved before being deployed.
8.5 Minimising operational overheads and annual running costs
All contracts are reviewed on a regular basis to ensure they continue to represent best value
for the council. Reviews are carried out in conjunction with the Corporate Procurement
Service.
Standardising on the Microsoft 365 suite of office productivity software and desktop
management tools has helped to streamline IT process and improve user experience.
Various implementation projects are currently underway which will upgrade or replace key IT
infrastructure and network components.
8.6 Ensuring backup/recovery of systems and disaster recovery of critical systems.
Comprehensive backups are available for all business-critical systems. A secondary data
centre is in place, providing business continuity and disaster recovery facilities for various
key business systems and services and diverse internet connectivity is also in place. A
review of Backup / Storage is under way.
8.7 Ensuring appropriate information security (availability, integrity, and
confidentiality)
The council complies with the requirements of connection to the Public Services Network
(PSN). Policies, procedures, technical architectures, and system security are assessed and
accredited on an annual basis.
Cyber Security initiatives include enhancing the Council’s protective monitoring capabilities,
reviewing the benefits of a specific cyber insurance policy, and implementing further security
controls in line with the Scottish Government’s Cyber Resilience Framework.
9. Future Service Delivery Aspirations/Challenges
9.1 Future Development – 2021-2024
• Investment in Microsoft M365 has allowed the roll-out of Windows 10 across the desktop
estate with a planned move to Windows 11 when appropriate. This goes together with
the Desktop Replacement programme which is seeing older devices replaced with
Windows 10 / Windows 11 compatible hardware. M365 is also allowing for the increased
use of Intune to manage the Desktop and mobile estate.
• Investment in the network allows M365 data traffic to break out directly to the internet
which reduces the burden on firewalls and data links.
• Investment in Telephony will help to support and sustain agile working by providing
Softphone access which brings the desktop phone to the laptop and makes it mobile.
• Sophos Intercept X software deployed to Corporate and Education IT estates to help
maintain and improve mitigation of cyber security threats.
• Ongoing data centre replenishment including replacement of core switches; upgrade of
back-up and recovery solution.

Page 125

10
• Reduction in capacity requirements over time through migration of corporate files and
data to Microsoft Sharepoint in the cloud
9.2 Capital Investment
ICT Capital Investment Arrangements and 10 Year Investment Strategy
• Highlights key areas of expenditure across ICT asset types along with the mechanisms
in place for project investment inclusion within the Capital Plan
• IT Services has a current Capital programme 21/22 in place totalling £2.27M enabling
the Council to continue to develop its ICT assets. The table below details the key
technology areas of budgetary spending.
• Over the last three years there has been investment in a wide range of projects to
enhance and improve the use of assets enabling the reduction and replacement of
legacy hardware and providing increased performance of the Council’s ICT assets.
ICT 10 Year Capital Programme
Investment
Areas
21/22
£
22/23
£
23/24
£
24/25
£
25/26
£
26/27
£
27/28
£
28/29
£
29/30
£
30/31
£
Total
Capital
£
ICT
Investment
Fund
481,000 255,000 288,400 382,400 376,600 702,600 297,600 282,600 282,600 297,600 3,646,400
WAN
(Wide Area
Network)
228,382 500,000 728,382
LAN
(Local Area
Network)
& WiFi
1,153,582 1,500,000 2,653,582
Telephony 409,554 650,000 1,059,554
Schools ICT
Investment
1,234,000 752,000 752,000 752,000 752,000 752,000 752,000 752,000 752,000 752,000 8,002,000

Page 126

11 
10. Action Plan 
Action
Plan
Reference
Action Desired
Outcome
Lead Timescale
ITAMP 1 PCRP –
Corporate
Desktop estate
is regularly
refreshed to
ensure that
most up to date
and secure
versions of
hardware and
software are
deployed
Carolann McGill Ongoing -
five-year
replacement
cycle
ITAMP 2 PCRP -
Education
Desktop estate
is regularly
refreshed to
ensure that
most up to date
and secure
versions of
hardware and
software are
deployed
Carolann McGill Ongoing -
five-year
replacement
cycle
ITAMP 3 LAN Refresh LAN hardware
replaced with
latest industry
standard
devices to
provide robust
and secure
connectivity
with reduced
device numbers
James McNeil March 2024
ITAMP 4 Hornbill ITSM
Asset
Management
ITSM software
added value
features are
exploited to
support lifecycle
inventory and
management of
assets
Carolann McGill March 2024
ITAMP 5 Digitisation of
Telephony for
2025
Understand
options for
replacement of
analogue phone
lines in advance
of UK 2025
switch to digital
lines
Carolann McGill December 2025

Page 127

1

Page 128

1
ASSET MANAGEMENT PLAN
OPEN SPACE

Page 129

2 
1. Introduction 
The Open Space Asset Management Plan (OSAMP) sets out the Council’s approach for the
management and maintenance of all open space assets. This plan complements and should
be read in conjunction with the Open Space Strategy 2016 - 2026.
Streetscene’s approach to Asset Management Planning is based on the guidance given by
CIPFA in their document “A Guide to Asset Management Planning and Capital Planning in
Scottish Local Authorities” which has been endorsed by the Scottish Government. CIPFA
updated the guidance and published ‘A Guide to Local Authority and Public Sector Asset
Management’ in November 2020. North Ayrshire Council’s governance of Asset
Management Planning was approved on 29 March 2011. 
2. Aims & Objectives 
The Open Space Asset Management Plan identifies how it will contribute to ‘Our Council Plan
2023 - 28’ to help achieve the Council’s vision ‘A North Ayrshire that is fair for all’ and mission
of ‘Working together to improve the lives of our people in North Ayrshire.’ 
The effective and efficient management and maintenance of the Council’s open space assets
contributes towards the Council’s priorities of: 
• A Sustainable Council
• Climate Change
• Wellbeing
• Communities and Local Democracy 
The key objective of the OSAMP is to ensure the Council’s assets are fit for purpose and
managed effectively and efficiently.
Open Space can be defined as:-
‘Any open space which provides, or has the potential to provide, environmental, social
and/or economic benefits to communities, whether direct or indirect, within and around urban
areas. It includes greenspace and hard landscaped areas with a civic function, as well as
aquatic open spaces’. 
3. General Description of Assets 
Type of Asset Number / Size
/ Area
Purpose / Use
Local Parks 14 These are areas which are well maintained for
public enjoyment of the natural heritage and the
provision of formal and informal recreation
opportunities.
Country Park 1 Provides an opportunity for all to participate in
outdoor activities such as walking, cycling, horse
riding and fishing. It also provides an inspirational
educational environment giving an opportunity to

Page 130

3
those wishing to learn about history, geography
and the natural world.
Cemeteries and Burial
Grounds
44 To ensure we have the capacity to bury the dead
in a well-managed and safe environment. To meet
our statutory obligation to maintain these sites
some of which are of historical significance both
locally and nationally.
War Memorials and
Monuments
37 (23 War
Memorials and
14
Monuments)
We will repair and protect our war memorials and
monuments. In accordance with the War Memorial
(Local Authorities Powers) Act 1923.
This power extends to the alteration of memorials
to commemorate the fallen of any conflict.
Civic Spaces Information not
available
Maintain the existing public realm/civic space and
support the development of existing and new sites
in line with the Local Plans and the Town Centre
Regeneration Strategies. By doing this we will
stimulate and develop our towns and villages
thereby promoting economic prosperity.
Trees and Woodlands 275 hectares Woodlands are managed in accordance with North
Ayrshire Council’s Tree & Woodland Management
Policy (2012).
Hedges and
Hedgerows
110,340 linear
metres
Hedges & Hedgerows act as green barriers to
roads and create a habitat for native flora and
fauna.
Allotments and
Community Gardens
4 Encourage local communities to develop allotments
and community gardens. We have community
groups actively pursuing allotment sites.
Sports Areas
(including sports
pitches, tennis courts,
putting greens and
bowling greens)
94 By continuing to improve sports areas both natural
and non-natural surfaces we will encourage
residents and visitors to participate in sport.
Play Areas (including
MUGAs)
107 play areas
9 MUGAs
(31 additional
play areas
within schools)
Providing safe and accessible opportunities for
children to play. By promoting and encouraging the
use of open space for play and adventure we
create an opportunity for children to become active
and healthy.
Benches including
picnic benches
1,079 For general seating purposes to enable people to
take a rest or to sit to read, take in a view or have a
picnic safely. Bench type and design is influenced
by the location and its purpose.
Litter bins and dog
waste bins
1,386 and 555 To enable  our  residents and visitors to comply
with the law when disposing of litter and dog waste
and promoting responsible behaviour. Both types of
receptacles enable our streets to remain free of

Page 131

4
litter and dog waste thus creating healthy attractive
environments.
Planters 137 To provide floral displays to enhance our towns and
civic amenity spaces.
Fences and barriers
(including bollards)
Information not
available
To prevent or restrict movement across a boundary
for safety reasons. Some fences are decorative
and serve not only as a boundary but enhance a
park or landscape feature including war memorials.
Water courses and
Water Bodies
38 Our rivers and inland waters offer a range of
opportunities for non-motorised water-based
activities and wildlife. The water courses are
managed as per North Ayrshire Council’s Water
Safety Policy (2021).
Promenades 5 Used by residents and visitors for exercise and
general recreation.
Beaches 16 North Ayrshire has an extensive coastline that is
used for a wide range of outdoor activities as well
as educational purposes.
A Data Management Review Plan has been created to record inventory data, storage,
updating and validation processes.
4. Current Performance / Drivers for Change
The following documents are produced to support the asset management process and are
reviewed and regularly updated.
Open Space Strategy 2016 - 2026
This will deliver through partnership working, open spaces that are inclusive, accessible and
‘fit for purpose’ enhancing the quality of life for residents in North Ayrshire and visitors to
North Ayrshire. This was approved by the Cabinet on 22 November 2016.
The 6 key strategic objectives of the Open Space Strategy are:
• Open Space will be promoted as a resource for tourism and recreation, economic
development & biodiversity.
• Help reduce local inequalities by ensuring that all communities have access to high
quality, well equipped clean and safe open space.
• Promote better health by providing diverse opportunities in open spaces, the natural
environment and countryside for physical exercise, sport and recreation.
• Protect and enhance all areas of nature conservation value, in particular historic
features, sensitive habitats and special landscapes.

Page 132

5 
• Improve the perception, quality and range of recreational and tourism facilities in the
open space areas.
• Respond to climate change through the delivery of a connected and integrated
network, incorporating water management, woodland area and biodiversity benefits. 
Open Space Asset Management Plan – records the service standards for each asset
group, identifies risks, and reflects local requirements, customer preferences and current
investment strategies.
Data Management Plan – records methods for collection, validating and updating of asset
data and an action plan for improvements regarding estimated or missing data.
Performance Reports – Local Environmental Audit and Management System (LEAMS) and
Land Audit Management System (LAMS) results. 
5. Condition and Suitability 
Strategic Approach – adopting a strategic approach to maintain and renew the asset and
make best use of available resources for the long- term benefit of the asset.
Optimal Allocation of Resources – investment is allocated to prioritise the delivery of
corporate objectives and to provide best value to our customers. Asset management
provides a framework for this process by identifying and prioritising needs across the open
space as a whole. Lifecycle planning is used to minimise whole life costs to ensure efficient
and effective use of resources.
Customer Focus – takes into account the needs and expectations of customers is
addressed by developing appropriate levels of service for each asset and incorporating a
Participatory Budgeting approach for part of the ground’s maintenance activities.
Through prudent asset management, North Ayrshire Council will make best use of available
resources in maintaining its open space and associated infrastructure.
Environmental factors contribute to the demands placed on the Open Space asset
management.
Climate change – changeable weather conditions with severe weather extremes are
becoming more common. This can result in deterioration of the Open Space Assets and our
ability to maintain them to the highest standard.
There are inspection regimes in place to ensure that assets are fit for purpose. These
inspection regimes are further used to allocate resources and inform future investment
programmes. The inspection regimes include the following key activities:-
Cleanliness and Maintenance Standards
The success of the cleanliness and maintenance regime is measured through the following
mechanisms:-
Local Environmental Audit and Management System (LEAMS)
Currently, three inspections per annum of a 5% cross-section sample of streets within the
area are assessed against the standards set down in the Code of Practice on Litter and

Page 133

6 
Refuse (Scotland) 2018 issued to fulfil the duties under the Environmental Protection Act
1990.
Play Areas
In line with guidance set by the Royal Society for the Prevention of Accidents (ROSPA), the
condition of play areas and equipment within the area are assessed on a weekly basis. This
regime is supplemented by a detailed annual assessment undertaken to inform the
programme to replace equipment and any other works that may be required to the play
areas.
Street Furniture
Assets are informally assessed by Streetscene Officers and Operatives as part of the
cleansing maintenance scheduled and replaced on an ‘as required’ basis. The location and
type of each asset has been mapped on the Council’s Geographical Information System
(GIS). This information will be utilised to inform a formal inspection and replacement
programme.
Trees and Woodlands
Assets are currently inspected on a reactive basis following reports of potential hazards.
Following inspection any appropriate arboriculture works identified are undertaken. An
inspection regime of trees along North Ayrshire’s A-class road verges began in Autumn
2018. The inspection of Roadside trees is an obligation for Roads under the Roads Scotland
Act 1984 and is supported by the councils Tree and Woodland Management Policy.
Water Features
Safety equipment and measures to restrict access are provided in line with ROSPA
guidance and inspected on a weekly basis. Any works required at this time are undertaken
as a matter of urgency. Formal inspection of water courses is undertaken in consultation with
the Scottish Environment Protection Agency (SEPA).
Allotments
Allotments and community gardens form part of the open space provision. North Ayrshire
Council does not directly manage any of the allotment sites, however, we actively support
the four allotment organisations who lease and occupy Council land. 
As part of the Council’s Open Space Strategy and Allotments Policy, we monitor demand for           
allotments and actively seek to identify new sites for food growing where required. We also           
encourage and support communities to take part in food growing. 
Infrastructure
Updated surveys have been carried out on cemetery infrastructure and an action plan is
being implemented with the recommendations from these surveys, the Cemetery Capital
Plan.
Memorial Testing
In line with guidance issued by the Health and Safety Executive (HSE) the Council
commenced a rolling five-year programme to inspect and take appropriate action to ensure
the stability of the 70,000 memorials currently present within its cemeteries. This is an
ongoing programme.

Page 134

7
War Memorials
The Council has a duty under the War Memorial (Local Authorities Powers) Act 1923 to
ensure the maintenance repair and protection of War Memorials within its control.
Streetscene Management/Maintenance Programmes
In managing and maintaining the Council’s Open Space and associated assets, the
Council’s Streetscene Service operates to agreed service standards. These standards are
published on the Council’s external website.
6. Sufficiency (i.e. asset demand)
North Ayrshire Council has a procedure in place for recording and dealing with complaints.
Details of general enquiries are recorded in the Lagan (Verint) System. This information
highlights numbers of specific types of fault or faults occurring in a geographical area.
A number of reporting forms have also been developed to enable customers to report
problems, issues or faults for the following: overflowing street bin or dog bin, street litter,
waste safety equipment or signage, litter, flytipping, flyposting, graffiti, abandoned vehicles.
North Ayrshire Council also has representatives who attend various meetings to ascertain
views and/or requirements – e.g. North Ayrshire Access Panel, Community Groups and
Estate Based Inspections. Representation is made by Streetscene (Operations and
Strategy) at Estate Inspections arranged by Housing services.
Responses are also sought via the North Ayrshire Community Planning Partnership People’s
Panel that is comprised of 2000 representatives of the population of North Ayrshire. The
People’s Panel is carried out every 2 years.
In 2018, Streetscene conducted an Open Space Satisfaction Survey to provide North
Ayrshire residents with an opportunity to comment on and provide feedback on North
Ayrshire’s parks, green spaces, and open areas. A total of 434 residents responded to the
survey. Overall, 71% of respondents were either very satisfied or satisfied with North
Ayrshire parks, beaches, and open spaces.
In 2017, Streetscene was integral to North Ayrshire Council’s Participatory Budgeting
activity, by offering the community an opportunity to influence part of the grounds
maintenance budget.
This Participatory Budgeting consultation approach enabled communities to identify local
priorities and needs and to shape some grounds maintenance activities to meet these
aspirations.
During 2021, a playpark consultation was carried out as part of the playpark improvement
funding programme across North Ayrshire. Over 500 responses were received, and this
feedback helped to ensure that the playpark improvement funding was utilised to meet the
needs of the local communities. Streetscene has identified a replacement programme for the
allocated playpark monies, and carried out member consultation across all 10 ward areas
with elected members.
Consultation is undertaken through the Locality Partnerships for local people within
communities; set in North Coast and Cumbrae, Three Towns, Garnock Valley, Arran,
Kilwinning and Irvine. This assists in identifying and addressing local issues, sets out
priorities for each locality and how they will be addressed within a developed Locality Plan.

Page 135

8 
On the North Ayrshire islands, we also work closely with Arran Community Council, Visit
Arran, Cumbrae Community Council, Garrison House Cumbrae and other key stakeholders
to consult on works programmed to be undertaken on the Island of Arran and Cumbrae so
that any concerns are addressed. 
7. Financial
The Council incurs an annual revenue expenditure of £5.188million for 2023/24 in the
maintenance of approximately 2,410 hectares of open space, consisting of:
• 1 Country Park
• 14 Local Parks
• 116 Equipped Play Areas & Multi Use Games Areas (MUGAs)
• 94 Sports Facilities and Playing Fields
• 44 Cemeteries and Burial Grounds
• 23 War Memorials
• 14 Monuments
• 275 hectares of Woodland
• 4 Allotments
• 38 Water Courses and Open Water features
• 16 Beaches - 3 are Sites of Special Scientific Interest (SSSI)
• 5 Promenades
• Residential Greenspace
• Street Cleaning 
There is a range of amenities within the Council’s Open Space, with an estimated
replacement value in excess of £3.5million, these are noted below:
• Play Equipment
• Sports Facilities, such as goal posts, nets etc.
• Benches/Picnic Tables
• Planters
• Fences, Barriers & Bollards
• Litter and Dog Waste Bins
• Memorials 
The nature of Open Space is such that a financial value cannot be accurately calculated for
all assets. However, the provision of high-quality Open Space can enhance the value of
adjacent land and areas.
Valuations can be undertaken on an individual basis should planning policies permit a
change in designation or where an enquiry in respect of potential purchase is received.
Capital - This is planned on a 10-year basis. Capital funds are profiled dependent upon
when the works are required.

Page 136

9 
8. Legislation 
Legislation changes can lead to increased demand on Local Authorities’ resources in
managing their assets.
• Environmental Protection Act 1990
• Burials and Cremation Act (Scotland) 2016
• Community Empowerment (Scotland) Act 2015
• War Memorial (Local Authorities Powers) Act 1923
• Wildlife and Countryside Act 1981
• Health & Safety at Work Act 1974
• Occupiers’ Liability (Scotland) Act 1960 
9. Policy / Guidance
The Council has a range of plans, policies and strategies in place to inform and co-ordinate
the provision, management and maintenance of its Open Space. These set out the approach
of the Council in response to national policy and legislation as well as the delivery of
objectives expressed locally by the community. These documents include:-
• Open Space Strategy
• Litter, Flytipping & Dog Fouling Prevention Strategy
• Tree & Woodland Management Policy
• North Ayrshire’s 2030 Woodland: A Tree Planting Strategy
• Water Safety Policy
• North Ayrshire Food Growing Strategy
• Children’s Play Strategy “The State of Play in North Ayrshire”
• Local Planning Policies 
10. Health and Safety 
The Health and Safety at Work etc. Act 1974 (also referred to as HSWA, the HSW Act, the
1974 Act or HASAWA) is the primary piece of legislation covering occupational health and
safety in Great Britain. The Health and Safety Executive, with local authorities (and other
enforcing authorities) is responsible for enforcing the Act and a number of other Acts and
Statutory Instruments relevant to the working environment. In order to comply with these
Health and Safety responsibilities the authority has in place several inspection processes
that are undertaken. These include: 
• Water Safety Equipment
• Play Facilities and Equipment
• Asset Condition checks
• Tree Surveys 
These processes dovetail with the relevant policies to ensure residents and visitors can enjoy
our open spaces in a safe manner.“

Page 137

10 
11. Risk Management 
This section summarises how the Council’s risk management strategy is applied to the
management of the open space asset. It identifies where risks associated with the open
space asset are recorded, identifies the major risks associated with the asset and outlines
how they are currently being controlled.
Risks are currently identified through formal and informal inspection and customer reporting. 
Risk Categorisation - The level of risk associated with Open Space are identified through
inspection and customer reporting. The assets are then categorised and priority repairs are
carried out accordingly.
Risk Control - Risks within the Open Space are controlled by carrying out inspections and
maintenance in accordance with Codes of Practice, adherence to the council’s policy and
compliance with the Open Space Strategy.
Monitoring and Reporting - Risk is continually monitored by the Streetscene management
team. The Executive Leadership Team receive quarterly risk update performance reports
through Pentana.
Risk Register - Top level risks for the Place Directorate are contained within the Directorate
Plan. 
12. Governance of the assets
Any missing or uncaptured assets will be highlighted in the Streetscene Data Management
Plan. This records methods for collection, validating and updating of asset data and an
action plan for improvements regarding estimated or missing data will be produced.
Environmental factors contribute to the demands placed on the Open Space asset
management.
Climate change – changeable weather conditions with severe weather extremes are
becoming more common. This can result in deterioration of the Open Space Assets and our
ability to maintain them to the highest standard. 
13. Service Delivery Aspirations / Challenges 
Investment is planned to coincide with asset conditions and future needs. For example,
predicting investment in cemeteries is based on asset condition survey information and the
capacity of current cemeteries, necessitating an extension. This data is invaluable in profiling
the capital budget to ensure it is targeted at the right asset, at the right time.
However, predicting the investment required in open space is more difficult as there are
outside factors out with Streetscene’s control such as climate change that can affect the
longevity of assets or result in emergency works.
This is mitigated by having a robust inspection regime in place and will help plan our future
needs and reduce risk. Regular ongoing maintenance of assets, such as play equipment,
also increases the longevity of assets and the planned replacement programme.

Page 138

11
Investment - Asset Types
Based on historical information, condition surveys, inspection reports and new funding
streams, planned investment is as follows:
Cemeteries: Investment in extending cemeteries (in accordance with the Council’s approach
to cemeteries and localities), wall repairs, improvements to pathways.
Play Equipment: Weekly inspections and regular maintenance will inform when play
equipment reaches end of life and needs assessed.
Furthermore, in 2021/22, a total of £500,000 was invested by North Ayrshire Council and in
2022/23 two grants for £118,000 and £117,000 were received from the Scottish Government
for the improvement and development of existing play facilities across North Ayrshire. Rather
than replacing like for like equipment, consideration will be given to items that are more
suitable for use by multiple service users.
Further investment from Scottish Government has been allocated for 2023 -2026 to support
the renewal of play parks across North Ayrshire Council.
The capital allocation received from the Scottish Government is as follows:
Capital allocation for 2023/24: £231,000
Capital allocation for 2024/25: £347,000
Capital allocation for 2025/26: £578,000
Street Furniture: Formal and informal inspections will help determine future needs.
Furthermore, in 2021/22 an investment fund of £250,000 was allocated to renew and
improve street furniture assets such as bins, benches and picnic tables. Consideration will
be given to accessibility for those with restricted mobility and wheelchair users.
Open Space: Inspections and audits will inform the investment required.
Woodlands: Inspections will inform the investment required. The Council’s Tree &
Woodland Management Policy sets out the circumstances during which trees could be
removed or pruned.
North Ayrshire’s 2030 Woodland: Investment of £500,000 was provided to plant
approximately 108,000 new trees by 2030 to help positively contribute to Climate Change. A
Tree Planting Strategy will also inform the sites to be selected for new planting areas and
woodlands to be created. This will include fruit trees to create orchards, in suitable
locations, for community benefit.
The Open Space maintenance schedule helps ensure structures are kept in a serviceable
condition.
The methodology used to allocate Revenue and Capital funding is outlined below.
Revenue
Works carried out under the revenue budget are generally reactive and routine works
identified through the inspection regime and/or reported defects from the public.
Works identified, where there is insufficient budget to immediately carry out repairs and

Page 139

12 
where they are not prioritised due to safety reasons, are recorded to be completed as and
when funding is available in line with overall priorities.
Funds are allocated to routine preventative and corrective works identified through
inspections. Any reduction in the funding of routine maintenance will accelerate the rate of
deterioration of the asset. 
14. How assets will be used in the future 
Open Space is acquired by the Council in three principal ways:-
• Direct purchase to support a specific Council objective, e.g. regeneration of an area,
or service delivery need e.g. to construct a new cemetery. 
• Development of vacant or derelict land within the Council’s ownership to support a
specific Council objective or service delivery need. 
• Through the planning process as part of the conditions of development e.g. a play
park within a new residential development. 
The general availability of vacant and derelict land within the area has enabled the Council
to retain high levels of open space and avoid disposal unless a particular area can contribute
to the realisation of a wider corporate objective.
Any requests to purchase or transfer land or where the Council wishes to dispose of land to
support a corporate objective will be considered in line with the Council’s Policy for Property
Acquisition and Disposal. In order to support the empowerment of local communities the
Council also has a policy to support the appropriate transfer of assets to community bodies.
This is in accordance with the Community Empowerment (Scotland) Act 2015. Streetscene
is represented on the Council’s Community Asset Transfer (CAT) Officers group.
Equipment and facilities within the Open Space are subject to an inspection programme and
will be assessed for future use purposes or replaced when they reach the end of their safe
working life. These assets are then disposed of in accordance with the Council’s Standing
Orders Relating to Contracts and Contract Procedure Rules.
The acquisition of assets is undertaken in line with the Council’s Planning Policies and Policy
for Property Acquisition and Disposal.

Page 140

13 
The Open Space Asset Management Plan sits within a strategic document framework shown
in the diagram below: 
15. Performance Indicators
Cleanliness standards
The Code of Practice on Litter and Refuse (Scotland) 2018, issued under the Environmental
Protection Act 1990, defines the maximum response times when a litter problem is reported
within or to a local authority. Once the new COPLAR is operational, the standard of street
cleanliness, assessed in terms of ‘litter’ will be measured using 6 categories graded as A, B,
C, D, E & F. 
Grades
A - No litter or refuse is present on any type of land
B - Small amounts of litter and refuse
C - Moderate amounts of litter and refuse, with small accumulations
D – Significant amounts of litter and refuse, with consistent distribution and accumulations
E – Substantial amounts of litter and refuse with significant accumulations
F – Incidents of Flytipping and hazardous/special waste (drug related waste, broken glass,
animal carcasses, car parts, chemicals and spillages) 
Response times – Duty 1
(keep land clear of litter and refuse)
The COPLAR (2018) Duty 1 response times are structured as four bands that recognise
duty bodies’ (the Council) investment in prevention.

Page 141

14
It reflects that effective measures increase the likelihood of zones being cleaner for longer,
which reduces the need for rapid restoration.
Streetscene endeavour to maintain all sites to an acceptable’ standard (Grades A and B),
and to address un-acceptable Grades (Grades C-F) within the response times as set out in
the COPLAR (2018).
In summary, these maximum response times will only ensure minimum
standards as defined by the Code of Practice on Litter and Refuse (Scotland) 2018.
The operational hours of working during the year are as follows:
• Shift teams: 06.30 to 17.30
LEAMS / COPLAR Update:
Since the new COPLAR was introduced in 2018, the intention was for Zero Waste Scotland
to introduce a new monitoring methodology (to replace the current LEAMS model) which
would be suited to carrying out audits which encompassed all land under the responsibility of
the local authority, and not limited to roads and footways. However there has been a delay
on finalising a suitable system. Therefore at present, while the methodology has been
changed to enable use of the new LMS (Litter Monitoring Survey) app, surveys are still
restricted to streets (as opposed to all land). An overall Cleanliness Score is still published
as per the LEAMS model, based on the percentage of streets achieving an ‘Acceptable’
Grade of A or B.
16. ACTION PLAN
Reference
Number
Action Desired Outcome Lead Timescale
OSAMP_A01 Maintain a list of all
Streetscene Open Space
assets to provide a
comprehensive asset
inventory and record
asset changes in ArcGIS.
Access to an up-to-date list
of assets to ensure all open
space assets are recorded
and monitored effectively.
Streetscene
Strategy / Assets
Ongoing
OSAMP_A02 Review existing Asset
Management Planning
and Inspection process to
inform future replacement
and investment
opportunities for open
space assets.
Develop an efficient
inspection and recording
process (with the option of
considering new technology)
to meet Streetscene’s
strategic and operational
asset management
responsibilities for open
space assets.
Streetscene
Strategy /
Streetscene
Operations /
Assets
Ongoing

Page 142

15
OSAMP_A03 Implement the actions from
the Streetscene
Volunteering Strategy and
encourage the Adopt a
Spot initiative.
Framework in place to
support and extend the
existing network of
community volunteers.
Streetscene
Strategy
March 2026
OSAMP_A04 Assess the risks of
climate change on open
space assets.
Develop a plan to mitigate
any anticipated risks from
the impact of climate change
and changing weather
conditions.
Streetscene
Strategy /
Streetscene
Operations
Annual
OSAMP_A05 Continually monitor and
assess the suitability of
the capital and revenue
budgets in accordance
with Asset Management
approach.
Effective and efficient use
of budgets.
Streetscene
Strategy /
Streetscene
Operations
Annual
OSAMP_A06 Work with external funding
organisations to obtain
funding for projects that
will result in improvements
to the condition and quality
of open space assets.
Partnership working to fund
bespoke projects.
Streetscene
Strategy /
Streetscene
Operations /
External
organisations
Ongoing