North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet
A Meeting of the Cabinet of North Ayrshire Council will  be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
29 August 2023 at 14:30 to consider the undernoted business.
Meeting Arrangements ­ Hybrid Meetings
This meeting will be held on a predominantly physical basis but with 
provision, by prior notification, for remote attendance by Elected 
Members in accordance with the provisions of the Local Government 
(Scotland) Act 2003.  Where possible, the meeting will be live­streamed 
and available to view at https://north­ayrshire.public­i.tv/core/portal/home
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 2 May 
2023 and Special Meeting held 13 June 2023 will be confirmed and the 
Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the 
Local Government (Scotland) Act 1973 (copy enclosed).
3 Exclusion of the Public ­ Para 9
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
9 of Part 1 of Schedule 7A  of the Act.
 
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer.
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
4 BUILD Project
Submit a report by the Executive Director (Place) to provide Cabinet with 
an update on the current status of the BUILD project (copy enclosed).
5 B714 Upgrade
Submit a report by the Executive Director (Place) to update Cabinet on 
the progress of the B714 Upgrade and seek approval for the reallocation 
of funding to support project delivery (copy enclosed).
Reports by the Chief Executive
6 Revenue Budget 2023/24 : Financial Performance to 30 June 2023
Submit a report by the Head of Service (Finance) to advise Cabinet of the
financial performance for the Council
at 30 June 2023 (copy enclosed).
7 Capital Programme and Treasury Management Performance to 30
June 2023
Submit a report by the Head of Service (Finance) to advise Cabinet of 
progress in delivering the Capital Investment  Programme 2023/24 and 
the associated Treasury Management performance to 30 June 2023 
(copy enclosed).
8 Corporate Health and Safety Annual Report 22/23
Submit a report by the Head of Service (Finance) to provide Cabinet with 
an update report on the Health and Safety performance within Council 
Services during 2022/23 (copy enclosed).
9 Council Tax Multipliers: Scottish Government Consultation
Submit a report by the Head of Service (Finance) to consider the 
Consultation response in respect of the review of the level of Council tax 
multipliers for Band E to Band H properties (copy enclosed).
10 Council Plan Performance Management Framework Report
Submit a report by the Head of Service (Democratic Services) to consider
and agree the Council Plan 2023 – 2028 Performance Management 
Framework (copy enclosed).
Reports by the Executive Director (Place)
11 Crown Estates Scotland – Memorandum of Understanding
Submit a report by the Executive Director (Place) seeking approval to 
renew a Memorandum of Understanding with Crown Estates Scotland 
(copy enclosed).
12 Visitor Levy (Scotland) Bill
Submit a report by the Executive Director (Place) to seek Cabinet 
approval to respond to active consultations on the Visitor Levy (Scotland) 
Bill; and set out working arrangements for exploration of the potential 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
benefit and impact of a visitor levy (copy enclosed).
13 Tree and Woodland Management Policy
Submit a report by the Executive Director (Place) to seek Cabinet 
approval on the proposed updated Tree and Woodland Management 
Policy (copy enclosed).
14 Memorial Benches, Plaques, and other Memorial Opportunities
Submit a report by the Executive Director (Place) to provide an overview 
and seek Cabinet approval of the appropriate options to be supported for 
memorials for members of the public to remember a loved one (copy 
enclosed).
Report by the Executive Director (Communities and Education)
15 Proposals for Community Investment Fund (CIF) Expenditure
Submit a report by the Executive Director (Communities and Education) 
to determine applications by Locality Partnerships to allocate CIF funding 
to proposed projects (copy enclosed).
16 Urgent Items
Any other items which the Chair considers to be urgent.
Webcasting
Please note: this meeting may be filmed/recorded/live­streamed to the
Council's internet site and available to view at https://north­ayrshire.public­
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live­streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for  webcasting  or  training  purposes  and  for  the  purpose  of  keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the meeting. 
This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north­ayrshire.gov.uk.
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet Sederunt
Marie Burns (Chair)
Shaun Macaulay (Vice­Chair)
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen
Chair:
Apologies:
Attending:
4

Page 5

Cabinet
30 May 2023 
At a Meeting of the Cabinet of North Ayrshire Council at 2.30 p.m. 
Present
Marie Burns, Tony Gurney, Alan Hill, Margaret Johnson, Christina Larsen and Shaun
Macaulay; and Andrew Bruce (Church Representative) and Jacqui McKenzie
(Teaching Representative) (Agenda Items 3 – 6). 
Also Present
Cameron Inglis. 
In Attendance 
C. Hatton, Chief Executive, M. Boyd, Head of Service and D. Forbes, Senior
Manager (Finance) and F. Walker, Head of Service (People & ICT) (Chief
Executive’s Service); C. Cameron, Director (Health and Social Care Partnership); R.
McCutcheon, Executive Director, D. Hammond, Head of Service (Sustainability,
Transport & Corporate Property), N. McIlvanney, Senior Manager (Growth &
Investment) and C. Fitzsimmons, Senior Manager (Economic Development and
Regeneration) (Place); A. Sutton, Executive Director, A. McClelland, Head of Service
and K. Herron, Senior Manager (Education) (Communities & Education); A. Craig,
Head of Service, M. McColm, Senior Manager (Communications), S. Wilson and C.
Stewart, Committee Services Officers (Democratic Services). 
Apologies
Lay Members Rev. Mark Goodman and Elizabeth Turbet. 
Chair
Marie Burns in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting of the Cabinet held on 2 May 2023 were confirmed and
the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973. 
3. School Attainment Results 2022 
Submitted a report by the Executive Director (Communities and Education) on the
overall performance of the 2022 North Ayrshire Council school leavers as highlighted
in the INSIGHT benchmarking tool and Curriculum for Excellence attainment levels
in literacy and numeracy for 2022. Supporting statistics were attached at Appendices
1-5 to the report.
Agenda Item 2
5

Page 6

The Cabinet expressed its thanks to the staff and pupils for the achievements
demonstrated in the report and noted the strong ethos in learning establishments
across North Ayrshire. 
Members asked questions and were provided with further information in relation to: 
• how the pupil destinations data was gathered and monitored by working
alongside Ayrshire College and the local employability partnership; and
• the impact on attainment levels caused by the COVID-19 pandemic and the
work undertaken to close this gap; and 
The Cabinet agreed to (a) approve the measures being taken to make further
improvements to attainment and achievement levels across all schools; and (b)
otherwise note the content of the report, including the progress being made by
learners, specifically in literacy and numeracy and the achievements of school
leavers in SQA examinations in 2022. 
4. Educational Achievement of Care Experienced Learners in North 
Ayrshire in 2022 
Submitted a report by the Executive Director (Communities and Education) on the
Curriculum for Excellence Broad General Education (BGE) attainment levels of care
experienced learners in 2022, Senior Phase attainment of care experienced school
leavers in 2022 and post-school participation of care experienced learners.
Supporting statistics were attached at Appendices 1-6 to the report. 
The Cabinet acknowledged the challenge for care experienced young people and
noted their achievements exceeded the national comparisons. Councillor Macaulay
highlighted that this work was not limited to learning establishments and thanked
both Education and the wider team. 
Noted. 
5. Proposal to amend the primary school catchment boundary between
Saltcoats and Stevenston 
Submitted a report by the Executive Director (Communities and Education) on the
outcome of the Statutory Public Consultation and seeking approval to amend the
primary school catchment boundary between Mayfield and Glencairn, St Anthony’s
and St John’s Primary Schools. The Consultation Report was attached at Appendix 1
to the report. 
The Cabinet agreed to (a) note the content of the Consultation Report at Appendix 1
to the report; and (b) amend the primary school catchment boundary lines between
Mayfield and Glencairn, St Anthony’s and St John’s Primary Schools from August
2023, as referred to in the report and illustrated in the location plan at Appendix 6 of
the Consultation Report. 
6

Page 7

6. Equality Mainstreaming Report 2020-22 and Outcomes 2021-2025 Mid-
Term Report 
Submitted a report by the Head of Service (Democratic Services) presenting the
Equality Mainstreaming Report 2020-22 and Outcomes 2021-2025 Mid-Term Report
(encompassing the Education Authority) Mid-Term Report. This was attached at
Appendix 1 to the report. 
On behalf of the Cabinet, Councillor Macaulay highlighted the huge amount of work
undertaken, noting that there was a range of different measures to support equal
rights in North Ayrshire and a lengthy process had been undertaken to produce this
report. 
Lay Member Jacqui McKenzie highlighted that Arran Pride Month took place in June
2022 as part of LGBT History Month and requested that this be corrected in the
report. 
The Cabinet agreed to approve (a) the content of Equality Mainstreaming Report
2020-22 and Outcomes 2021-2025 Mid-Term Report set out at Appendix 1 to the
report, subject to the minor correction highlighted in terms of the 2022 Arran Pride
event; and (b) publication of the report on the Council’s website as required under
the Equality Act 2010. 
7. Appointment of Older People’s Champion 
Submitted a report by the Head of Service (Democratic Services) on the appointment
of an Older People’s Champion following the resignation of the previous
representative. 
Councillor Larsen, seconded by Councillor Macaulay, formally nominated Councillor
Burns to be appointed as the Older People’s Champion. There being no other
nominations, Councillor Burns was duly appointed. 
The Cabinet congratulated Councillor Burns on her appointment. 
In terms of Standing Order 6.8 (vii), Councillor Burns, Chair, agreed that the meeting
be adjourned at 3.25 p.m. to resolve a technical issue affecting audio broadcast of
the meeting. The meeting reconvened at 3.35 p.m. with the same Members and
officers present and in attendance, with the exception of Lay Members Andrew
Bruce and Jacqui McKenzie. 
8. Revenue Budget 2022/23 : Financial Performance to 31 March 2023 
Submitted a report by the Head of Service (Finance) on the financial performance of
the Council for 2022/23. 
Members asked questions and were provided with further information in relation to
ongoing monitoring of key areas and emerging risks, how these were addressed
when closing accounts for the financial year and the proposed earmarking which
sought to mitigate these risks.
7

Page 8

The Cabinet agreed to (a) approve the earmarking of £3.524m identified at section
2.5 of the report to meet future year commitments; and (b) otherwise note (i) the
information and financial outturn position outlined in the report, (ii) the transfer of the
net in-year underspend of £1.524m to support the Roads Maintenance budget and
the Energy Smart scheme, as approved by Council, (iii) the financial performance of
the Health and Social Care Partnership highlighted at section 2.6 of the report, (iv)
the deficit position of KA Leisure and (v) the virements detailed in Appendix 7 to the
report. 
9. Capital Programme Performance to 31 March 2023 
Submitted a report by the Head of Service (Finance) on progress in delivering the
Capital Investment Programme for 2022/23. 
Members asked questions and were provided with further information in relation to
current treasury advice and the possibility of interest rates against borrowing
reducing in the near future. 
Noted. 
10. Cost of Living Crisis 
Submitted a report by the Executive Director (Communities and Education) providing
a second progress report in relation to the North Ayrshire Council responses to the
current cost-of-living crisis and associated investments and funds. The Cost of Living
Themes & Updates paper was attached at Appendix 1 to the report. 
The Cabinet expressed thanks to all involved in the work undertaken and highlighted
the efforts to tackle poverty and embed support to people in North Ayrshire. 
The Cabinet agreed to (a) accept future progress reports on the investments, funds
and activity associated with the cost-of-living crisis; and (b) otherwise note the
progress the Council had made in developing support in relation to the cost-of-living
crisis. 
11. Regeneration Delivery Plan Action Programme and Funding Proposals 
Submitted a report by the Executive Director (Place) seeking approval for the
proposed Regeneration Delivery Plan action programme and funding proposals. 
The Cabinet recognised the success of the Council and congratulated the team on
the extent of the funding attracted. 
Members asked questions and were provided with further information in relation to: 
• the Garrison House and Arran Dyemill Park projects and the positive impact
funding had had on both projects; and
• the importance of reviewing and updating the Regeneration Delivery Plan to
reflect changing circumstances across localities. 
8

Page 9

The Cabinet agreed (a) to approve (i) the draft Action Programme as detailed at
Appendix 1 to the report, (ii) the Regeneration Delivery Plan funding proposals as
detailed at Appendix 2 to the report and (iii) the granting of delegated authority to the
Executive Director (Place) to agree changes to the funding allocations in consultation
with the Portfolio Lead as required; and (b) otherwise to note the progress made on
the implementation of the Regeneration Delivery Plan. 
12. North Ayrshire Community Transport Pathfinder 
Submitted a report by the Executive Director (Place) setting out initial proposals for a
Community Transport Pathfinder project in North Ayrshire. 
Members asked questions and were provided with further information in relation to: 
• the positive impact day trips and excursions would have on people facing
social isolation; and
• the support model being agreed with Coalfield Community Transport noted at
section 2.13 to the report and an example of what this would look like. 
The Cabinet agreed to approve the next steps for the Community Transport
Pathfinder set out at sections 2.11 to 2.14 of the report. 
13. Decarbonisation of the Council’s Fleet 
Submitted a report by the Executive Director (Place) on the decarbonisation journey
to date and further proposals to decarbonise the Council’s vehicle fleet. 
The Cabinet welcomed the recommendation that the purchase of new passenger
and light commercial vehicles would be zero emission only, resulting in  phasing out
the purchase of petrol and diesel vehicles 2 years earlier than required, and thanked
the team for their proactive approach.  
Members asked a question and were provided with further information in relation to
the role green hydrogen was expected to have in addressing emissions and the
anticipated timescale for this. 
The Cabinet agreed to (a) approve the proposals and recommendations set out at
section 2.31 of the report; and (b) otherwise to note the decarbonisation routemap
work summarised within the report. 
14. Ardrossan Harbour Redevelopment Procurement Agreement 
Submitted a report by the Executive Director (Place) seeking agreement to enter a
procurement agreement with Ardrossan Harbour Company Limited to allow the
Ardrossan Harbour Redevelopment tender process to proceed. 
The Cabinet agreed to enter into a procurement co-operation agreement with the
Ardrossan Harbour Company Limited [AHCL] to enable Peel Ports Group to lead a
procurement process to secure contractors to undertake the proposed
redevelopment works at Ardrossan Harbour.
9

Page 10

15. UK Shared Prosperity Fund – Communities and Place Fund 
Submitted a report by the Executive Director (Place) on the UK Shared Prosperity
Fund (SPF) and seeking approval of the proposed approach to the Communities and
Place Grant Fund. 
Members asked a question and were provided with further information in relation to
engagement undertaken with locality partnerships and Elected Members. 
The Cabinet agreed to approve the proposed approach to the Communities & Place
Grant fund provided at Appendix 1 to the report. 
The meeting ended at 4:35 p.m.
10

Page 11

Cabinet
13 June 2023
IRVINE, 13 June 2023 - At a Special Meeting of the Cabinet of North Ayrshire
Council at 2.30 p.m.
Present
Marie Burns, Tony Gurney, Alan Hill, Margaret Johnson, Christina Larsen and Shaun
Macaulay.
Also Present
Cameron Inglis, Davina McTiernan and Eleanor Collier.
In Attendance
C. Hatton, Chief Executive, M. Boyd, Head of Service and D. Forbes, Senior
Manager (Finance) and F. Walker, Head of Service (People & ICT) (Chief
Executive’s Service); A. Sutton, Executive Director (Communities & Education); C.
Cameron, Director and E. Stewart, Interim Head of Service (Children, Families &
Justice) (Health & Social Care Partnership); R. McCutcheon, Executive Director, T.
Reaney, Head of Service (Neighbourhood Services), Y. Baulk, Head of Service and
A. Elliot, Senior Manager (Housing and Public Protection), N. McIlvanney, Interim
Head of Service (Growth, Investment and Employability) and M. Ritchie, Interim
Senior Manager (Growth & Investment) (Place); A. Craig, Head of Service, I. Hardy,
Team Manager and N. Sugden, Policy Officer (Policy, Performance & Elections), J.
Hutcheson, Senior Communications Officer (Communications), S. Wilson and C.
Stewart, Committee Services Officers (Democratic Services).
Chair
Marie Burns in the Chair.
1. Declarations of Interest
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors.
2. Regulation of Investigatory Powers (Scotland) Act 2000
Submitted a report by the Head of Service (Democratic Services) providing an
update on the Council’s use of the Regulation of Investigatory Powers (Scotland) Act
2000.
Members asked a question and were provided with further information in relation to
the powers afforded to the Council and appropriate use of the Act.
Noted.
11

Page 12

3. Discretionary Housing Payment Policy
Submitted a report by the Head of Service (Finance) seeking approval of the revised
Discretionary Housing Payment policy. The revised policy was attached at Appendix
1 to the report.
The Cabinet acknowledged that a key priority for the Council was addressing child
poverty and the cost-of-living crisis, noting that the increased allocation of £315,000
in the budget for 2023/24 ensured support would continue to be provided to those in
need. 
The Cabinet agreed to approve the revised policy for the administration of
Discretionary Housing Payments, as detailed in Appendix 1 to the report.
Please note – the following item was heard by the Audit & Scrutiny Committee
on 27 June 2023, please refer to the minute of that Committee for the decision.
4. Council Tax for Second and Empty Homes, and Non-Domestic Rates
Thresholds: Consultation
Submitted a report by the Head of Service (Finance) outlining the proposed
response from North Ayrshire Council to the Scottish Government’s consultation on
Council Tax for second and empty homes, and non-domestic rates thresholds. The
Respondent Information Form was attached at Appendix 1 to the report.
Members asked questions and were provided with further information in relation to:
• the proposed response to the Scottish Government consultation;
• support for the Council having the powers to decide whether to apply a
premium Council Tax on second and empty homes; and
• decisions taken based on supporting evidence and the consequences of
applying a premium rate.
The Cabinet agreed to approve the proposed consultation response at Appendix 1 to
the report, for submission to the Scottish Government by the consultation deadline of
11 July 2023.
5. North Ayrshire Children’s Services Plan 2023-26
Submitted a report by the Director (Health & Social Care Partnership) presenting the
North Ayrshire Children’s Services Plan 2023-26. This was attached at Appendix 1 to
the report.
Councillor Burns thanked officers of the Council and the Health and Social Care
Partnership and the young people involved in the first joint Cabinet for care
experienced young people which took place on 13 June 2023.
Members asked questions and were provided with further information in relation to:
12

Page 13

• the services and outcomes delivered for families through the expanded Family
Centred Wellbeing Service; and
• available resources and additional funding from the Scottish Government
ensuring best use of these to improve outcomes for children and families. 
The Cabinet agreed to endorse the North Ayrshire Children’s Services Plan 2023-26
attached at Appendix 1 to the report for submission to the Scottish Government. 
6. Corporate Parenting Plan and The Promise 3 Years On 
Submitted a report by the Director (Health & Social Care Partnership) providing an
update on the ongoing work within North Ayrshire to develop the Corporate
Parenting Plan and to deliver “The Promise”. The Summary Report on Progress and
the Corporate Parenting Plan were attached at Appendices 1 and 2 to the report. 
The Cabinet acknowledged and thanked the team involved for the considerable work
undertaken in this area and highlighted the benefits that came from “The Promise” in
terms of putting young people at the heart of the system. 
Members asked questions and were provided with further information in relation to: 
• the impact on services and young people amid growing demand for continuing
care in placement; and
• the criteria used by the Council to measure success in “The Promise”. 
Noted. 
7. Child Poverty Strategy 2023-26; Progress report 2022-23 and Action Plan
2023-24. 
Submitted a report by the Executive Director (Communities & Education) on the draft
North Ayrshire Child Poverty Strategy covering the period 2023-26, the North
Ayrshire Child Poverty Report 2022-23 and the North Ayrshire Child Poverty Action
Plan 2023-24 set out in the appendix to the report.  The report sought approval to
submit the report to the Scottish Government and publish it on the North Ayrshire
Community Planning Partnership website. 
The Cabinet noted the importance of highlighting the cause of poverty and thanked
the Employability team for the considerable work undertaken.  
Members asked questions and were provided with further information in relation to: 
• addressing the risks exacerbated by the cost-of-living crisis, specifically to
children on the Islands and rural communities; and
• how the reports presented to Cabinet linked into the Child Poverty Strategy. 
13

Page 14

The Cabinet agreed to approve (a) the North Ayrshire Child Poverty Strategy
covering the period 2023-26 and the North Ayrshire Child Poverty Report 2022-23
and Action Plan 2023-24 set out in the appendix to the report; and (b) submission of
the report to the Scottish Government in addition to being published on the North
Ayrshire Community Planning Partnership website. 
8. Children’s Rights Report 2020/23 
Submitted a report by the Executive Director (Communities & Education) seeking
approval of the North Ayrshire Children’s Rights Report 2020/23 attached at
Appendix 1 to the report. 
The Cabinet agreed to approve the North Ayrshire Children’s Rights Report 2020/23
set out at Appendix 1 to the report. 
9. Dundonald Crescent, Auchengate. 
Submitted a report by the Executive Director (Place) on the outcome of the
Member/Officer Working Group on Dundonald Crescent, Auchengate. 
Members asked a question and were provided with further information in relation to
how often the Council received requests to adopt a private road and the process
undertaken when a request was received. 
The Cabinet thanked all involved for the work undertaken to reassess the costs, as
noted within the report. 
The Cabinet agreed (a) not to undertake the upgrade works at Dundonald Crescent,
Auchengate to bring the private road and associated infrastructure up to an
adoptable standard; and (b) otherwise to note (i) the findings of the Member/Officer
Working Group and (ii) that the maintenance responsibility for the road and
associated infrastructure lay with the owners. 
10. I3 – Sale of Land at Strategic Investment Campus 
Submitted a report by the Executive Director (Place) seeking approval for a minor
increase to the size of an area of land at i3 in Irvine that Cabinet had previously
approved to be sold, subject to appropriate conditions. The proposed site location
and layout plan were attached at Appendices 1 and 2 to the report, respectively. 
Members asked questions and were provided with further information in relation to
ensuring the Council maximised the potential of the i3 site. 
The Cabinet agreed (a) to approve the increase from 2 acres to 2.498 acres of the
area of land to be sold to System Five Off Site Ltd. at the Strategic Investment
Campus at i3 Irvine and (b) grant authority to the Executive Director of Place to
negotiate the terms of the sale, including a price proportionate to the revised area of
land. 
14

Page 15

11. Local Housing Strategy 2023-2028 
Submitted a report by the Executive Director (Place) seeking approval of the
proposed Local Housing Strategy 2023 - 2028 and associated action plan attached
at Appendices 1 and 2 to the report, respectively. 
Members asked questions and were provided with further information in relation to: 
• the use of North Ayrshire Council’s internal architects for the development at
Irvine Harbour and whether this would be the preferred process for future
developments;
• the percentage of new build houses that were built with accessible needs in
mind and whether this had alleviated pressure to adapt current housing stock;
• whether the target number of new dwellings would still be achievable by 2028;
and
• what powers and resources the Council had to take action in terms of private
buildings in disrepair. 
The Cabinet agreed (a) to approve (i) the Local Housing Strategy 2023 – 2028 at
Appendix 1 to the report and (ii) the associated action plan at Appendix 2; and (b)
that these be published and submitted to the Scottish Government. 
12. North Ayrshire Visitor Management Plan 2023 
Submitted a report by the Executive Director (Place) seeking approval of  the
amended Visitor Management Plan, to support ongoing actions to manage domestic
tourism in North Ayrshire during 2023. The Visitor Management Plan was attached at
Appendix 1 to the report. 
The Cabinet thanked the team and all involved in the working group for the excellent
work undertaken on the Visitor Management Plan. 
The Cabinet agreed to approve the draft North Ayrshire Visitor Management Plan for
2023 set out at attached at Appendix 1 to the report. 
13. Housing Services’ Customer Participation Strategy 2023-2028 
Submitted a report by the Executive Director (Place) presenting the draft Customer
Participation Strategy 2023-2028 for approval. The Strategy was attached at
Appendix 1 to the report. 
Members asked a question and were provided with further information in relation to
different routes, such as social platforms, that were worth exploring to ensure as
wide a range of people as possible was reached. 
The Cabinet agreed to approve the content of the draft Customer Participation
Strategy 2023-2028 attached at Appendix 1 to the report. 
The meeting ended at 4.35 p.m.
15

Page 16

16

Page 17

NORTH AYRSHIRE COUNCIL 
29 August 2023 
Cabinet 
Title:    B714 Upgrade 
Purpose:  To update Cabinet on the progress of the B714 Upgrade and
seek approval for the reallocation of funding to support project
delivery. 
Recommendation:  That Cabinet:
a) Notes the progress made to date on the project;
b) Approves the reallocation of Council funding, detailed at
Appendix One, to support the delivery of the project, subject
to the approval of the Final Business Case; and
c) Agrees to the submission of the updated Outline Business
Case to the UK Government for approval, informed by
feedback on the draft submission. 
1. Executive Summary 
1.1 The upgrade of the B714 is a strategic transport priority of the Council. It aims to
increase the potential for economic development and tourism by significantly
improving connectivity to Glasgow, the Central Belt and wider motorway network.
Cabinet approved the submission of an application for the project to the first round of
the UK Government’s Levelling Up Fund in June 2021.   
1.2 The outcome of the application was confirmed in October 2021, providing a £23.7m
funding award.  Cabinet approved the acceptance of the award and the delivery of the
project, subject to securing the necessary consents and permission in January 2022. 
This report provides an update on the progress made to date on the project, seeks
approval for the reallocation of funding to support its delivery and seeks agreement for
the submission of the Outline Business Case to UK Government. 
2. Background 
2.1 The UK Government’s £4.8 billion Levelling Up Fund (LUF) aims to invest at least
£800 million in Scotland, Wales and Northern Ireland. North Ayrshire was identified as
a ‘priority one’ category authority given our socio-economic and connectivity
challenges. The Fund focusses investment on projects funding across three themes:
town centre and high street regeneration; local transport; projects and maintaining or
explaining cultural and heritage assets. 
Agenda Item 5
17

Page 18

2.2 Cabinet approved the submission of the B714 Upgrade on 15 June 2021 to Round
One of the Fund as a key transport project. The application was submitted to UK
Government on 18 June 2021 and the outcome received on 27 October 2021.  This
confirmed an award of £23.7m which equated to approximately 90% of the projected
costs at the time of submission.  This was match funded by a £3m allocation from the
Council’s Investment Fund providing the 10% balance required by the Fund. 
2.3 The upgrade of the B714 will significantly improve connectivity between North Ayrshire
and Glasgow, the Central Belt and wider motorway network. This will substantially
increase the potential for tourism and economic development and provide enhanced
links to the Arran and Cumbrae Ferry services. It will contribute to the repopulation of
our islands and rural areas by providing improved access between the ferry terminals,
mainland settlements, Glasgow, the central belt and wider motorway network. This will
ensure that those living in our rural, remote and island communities are well
connected and have equitable access to services as those living in the rest of
Scotland. It will also divert a significant volume of traffic accessing the A78 away from
Kilwinning as traffic will connect directly to the A78 via the new upgraded B714. 
2.4 The Levelling Up Fund requires that a Full Business Case (FBC) be prepared and
approved before larger transport schemes can formally commence and the full funding
package is confirmed. The Department for Transport (DfT) has indicated that there is
a possibility that the funding could be cancelled if Government policy changes or if the
necessary legal permissions or match funding cannot be secured.  To date the DfT
has supported the project through the provision of Development Funding to enable the
preparation of the Outline Business Case and design.   
2.5 The B714 Project Team was formed comprising of representatives from Economic
Development and Regeneration and Neighbourhood Services alongside the economic
and design consultants.  The Project Team has progressed the preparation of the
OBC and design for submission to the DfT.  Regular liaison has also been maintained
and progress reporting undertaken with DfT during this period to meet the funding
requirements.  This has been overseen by the B714 Upgrade Project Board
comprised of cross Service representatives and the Place Project Board.   
2.6  Extensive consultation has been undertaken with landowners and a broad range of
stakeholders during this period.  This included a public consultation and exhibition in
November and December 2022 on the preferred option.  Detailed ground
investigations and surveys including environmental and ecological surveys have also
been undertaken with the landowners’ approval. The feedback and information
obtained from this process has informed the Business Case and design development. 
2.7 Construction costs have substantially increased since the submission of the LUF
application due to the impact of the pandemic and economic climate.  This has
resulted in increases in the projected costs.  The Project Team has investigated
several design and value engineering opportunities to deliver the project within the
available £26.7m funding envelope.  This has included consideration of measures
which would also reduce the benefits proposed via the initial LUF submission. Any
significant benefits reduction could however put the LUF funding offer at risk. 
2.8 This process has now been exhausted.  It is proposed that: 
18

Page 19

• The project be delivered across two phases with Phase One commencing at
Girthill to the Hillend Roundabout with on-line improvements between
Meiklelaught and Muirlaught.
• A roundabout be constructed to connect the upgraded road to the Hillend
Roundabout.
• Phase Two between the Sharphill Roundabout and Muirlaught be delivered at a
later date, subject to funding.  
• The electric vehicle charging facilities and elements of the environmental
enhancements be delivered through alternative funding sources.
• Active travel infrastructure and associated earthworks along the route be
removed and delivered through alternative sources at future date.
• Localised active travel improvements within Dalry and Saltcoats be delivered
through funding secured from Strathclyde Partnership for Transport’s Capital
programme and other external funding sources. 
2.9 This has resulted in a cost estimate for the project of £31.7m, inclusive of contingency
and inflation allocations, to support the submission of the business case.  This is
without a significant reduction in benefits as it contributes to the Levelling Up
objectives by: 
• Improving the resilience of and enhancing the most direct link between Glasgow
and the Three Towns;
• Improving safety and contributing to accident reduction on the B714 through
increased width and improved road alignment over the most sub-standard
sections from Girthill to Hillend Roundabout and Meiklaught to Muirlaught; and
• Contributing to alleviating congestion and air quality related issues in Kilwinning. 
2.10  This equates to an estimated £5m deficit based on the available £26.7m budget.  The
project will be subject to a tender process should the OBC be approved.  The FBC
would then revisit the OBC and record the findings of the tender process.  Advice from
the Council’s consultant engineers and economic consultancy, recommends against
any further reductions to the standard or length of the upgrade.  This is due to the:
reduction in benefits which could be derived from the project; the potential impact on
the likelihood of securing LUF funding; and the impact on the programme and
deliverability of the project within the funders’ timescales. 
2.11 The funding package for the project requires to be confirmed to allow the progress of
both the Business Case through the formal DfT process and the Compulsory
Purchase Order Process (CPO).  A parallel landowner negotiation and CPO process
is proposed to progress the land requirements for the project. This is to ensure that
the land acquisition can be achieved, and the project delivered within the funding
timescales. The preference will however be to negotiate and reach agreement with the
landowners on the purchase of the land. A land agent and dedicated Solicitor with
Legal Services were appointed and have supported landowner engagement to date. A
report will be submitted to Council seeking approval for the CPO process. 
2.12 Engagement with UK Government has concluded that additional funding will not be
available via LUF to address the deficit.  Transport Scotland has also confirmed that
funding will not be forthcoming for the project.  The reallocation of the Council funding
outlined at Appendix One is therefore proposed to meet the £5m deficit.  This
proposes reallocating funding from other Council projects and sources to support the
delivery of the B714 Upgrade including allocations under the Investment Fund. 
19

Page 20

Mitigation measures are identified for these projects.  Officers would also continue to
investigate potential sources of funding for the B714 and affected projects with a view
to offsetting the financial contributions from these sources where possible. 
2.13 The draft Outline Business Case (OBC) has been issued to DfT for initial feedback to
inform the development of the final version.  The approval of this reallocation will allow
the formal submission of the OBC to the UK Government for approval, informed by
feedback on the draft currently being reviewed by DfT and progress on the CPO
process.  A formal decision on the OBC will be received within a maximum 12 week
period of its formal submission.  This will determine whether the project can proceed
to Full Business Case and construction.  Further clarity is being sought from UK
Government and DfT on the timescales for the delivery of Round One projects. 
3. Proposals 
3.1 That Cabinet: 
(a) Notes the progress made to date on the project;
(b) Approves the reallocation of funding to support the delivery of the project, outlined
at Appendix One, subject to the approval of the Final Business Case; and
(c) Approves the submission of the updated Outline Business Case to the UK
Government for approval, informed by feedback on the draft submission. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Department for Transport (DfT) has indicated that there is a possibility that the
funding could be cancelled if Government policy changes or if the necessary legal
permissions or match funding cannot be secured. The Council requires to provide
10% match funding for the initial £26.7m project. This will be met by the £3m
Recovery and Renewal Fund capital allocation approved by Cabinet on 15 June 2021. 
Discussions with UK Government and Scottish Government have concluded that
additional funding will not be forthcoming for the project via the LUF or Transport
Scotland budgets.  It is proposed that the balance of the £5m deficit outlined at
Section 2.10 be met by reallocating the funding outlined at Appendix One. 
The DfT has provided 10% of the overall allocation as development funding from the
to support the development of the project to Outline Business Case stage. This
approach aims to provide 90% of the costs to this stage with the remaining 10% being
met from the Council’s capital allocation. This has assisted in managing the financial
risk to the Council in developing the project. 
Human Resources 
4.2 The estimated cost of the staffing requirements for the project were included in the
application and business case submitted.  These have been refreshed in the updated
estimates. This includes project management and legal staffing requirements to
support the land acquisition process. 
20

Page 21

Legal 
4.3 A parallel landowner negotiation and Compulsory Purchase Order (CPO) process is
proposed to progress the land requirements for the B714 project. This is to ensure
that the land acquisition can be achieved, and the project delivered within the funding
timescales. This is proposed due to the length of the route, number of landowners and
timescales for delivery. The preference will however be to negotiate and reach
agreement with the landowners on the purchase of the land. 
The estimated cost of the CPO process was included within the funding application
and business case submitted. This has been refreshed in the updated estimates.
Engagement with landowners is ongoing. Further engagement will be undertaken
informed by the outcome of this report and the Business Case consideration by UK
Government. A further report will be submitted to Council seeking approval for the
CPO process. 
Equality/Socio-economic 
4.4 The project will assist in meeting our socio-economic duty as set out in the Fairer
Scotland Duty. It seeks to reverse economic, social and physical decline and reduce
socio-economic disadvantage. It aims to build community wealth and tackle local
deprivation by improving connectivity to support economic development and the
repopulation of our islands which will contribute to the regeneration of our
communities. 
Environmental and Sustainability 
4.5 The project aligns with the Environmental Sustainability and Climate Change Strategy.
The upgraded B714 project will also reduce the impact of transport on our
communities, will see improved electric vehicle charging availability between the
Three Towns and the Garnock Valley. In particular, it will reduce the volume of traffic
travelling through Kilwinning past four schools, reducing pollution, congestion and the
potential for accidents. 
Key Priorities 
4.6 The project will contribute to the four Council Plan priorities and key activities of:
Ensuring our places and spaces where we live, work and visit are well maintained and
accessible; Developing infrastructure to support business growth; Working with
communities to adopt low carbon behaviour change; Transitioning to low and zero
carbon travel; and Focusing our investment on priorities. 
Community Wealth Building 
4.7 The project will contribute to Community Wealth Building and will have a significant
positive impact on the Council’s ambitions under the following pillars. 
Procurement: Local supply chain opportunities will be created through the project. For
future procurement exercises related to the project, the EDR Business Development
team will review opportunities for the North Ayrshire business base and provide
supplier development support as required. 
21

Page 22

Fair Employment: The project will create employment opportunities particularly within
the construction sector. Where North Ayrshire is the contractor for services, through
our enhanced Community Benefits approach we will ensure the creation of local
training and work experience opportunities.  Furthermore, the upgrade of the B714 will
provide enhanced connectivity to help those from rural areas access work. 
Financial Power: The project will invest in localities and leverage external national
investment into North Ayrshire. 
5. Consultation 
5.1 The project has been informed by the Regeneration Delivery Plan (RDP). The RDP
sets out the Council’s priorities for regeneration until 2026 and was the subject of
extensive consultation including workshops with Council Officers; workshops with
Elected Members; reports to and feedback from North Ayrshire Ventures Trust and the
Community Wealth Building Expert Panel; and public engagement via Consul. It was
also informed by the Locality Partnerships’ priorities and previous public consultation
exercises including Charettes. 
5.2 The draft Outline Business Case and design has been informed by extensive
consultation with Elected Members, landowners, communities, road users, transport
providers, transport industry and community organisations. This included a public
consultation and exhibition in November and December 2022.  Further consultation
and engagement will be undertaken to inform the development of the Final Business
Case and detailed design. 
5.3 Letters of support were received for the funding application from a range of sources
including: the Rt Hon Patricia Gibson MP; Kenneth Gibson MSP; Jamie Greene MSP;
and the Nuclear Decommissioning Authority. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Louise Kirk, Interim Head of Service – Economic
Development and Regeneration, on 01294 324766. 
Background Papers
Cabinet Report, Levelling Up Fund, 15 June 2021
Cabinet Report, Levelling Up Fund – Round 2, 2 November 2021
Cabinet Report, Levelling Up Fund B714 Upgrade, 25 January 2022 
22

Page 23

Appendix One: Funding Reallocation Proposals 
The table below summarises proposals to reallocate capital allocations previously approved to support the delivery of economic
development priorities to the B714 Upgrade project.  This includes the reallocation of funds agreed under the Investment Fund and
capital receipts projected from the sale of land and assets.  The proposals have been developed through engagement with Finance. 
Fund and background Proposed approach and mitigation
Recovery and Renewal Fund
Stimulating Start Up and Early Stage Business Growth (£1m).  Agreed
as part of the Renewal Investment allocations in June 2021 to stimulate
start up and early stage business growth through the delivery of
commercial space. 
• Allocate £1m to the B714 Upgrade.
• Investigate the potential to resource the delivery of the
investment fund priorities through future years place based
funding allocations and external funding applications.
Investment Fund
Community Wealth Building – Communities and Town Centres (£1.2m
allocation).  Agreed as part of the original Investment Fund allocations
in March 2020 to tackle vacant and derelict land and buildings in town
centres through regeneration and economic development projects.
• Allocate the balance of £0.857m to the B714 Upgrade.
• Investigate the potential to resource the delivery of the
investment fund priorities through future years place based
funding allocations and external funding applications.
Commercial Estate / Infrastructure / Town Centre Investment
(£1.155m).  Agreed as part of the original Investment Fund allocations
by Council in March 2020 to invest in the commercial estate including
improving the sustainability of assets.
• Allocate the balance of £0.988m to the B714 Upgrade.
• Investigate the potential to resource the delivery of the
investment fund priorities through future years place based
funding allocations and external funding applications.
Existing Capital Resources
Industrial Portfolio Council Commercial estate investment allocation
(£1m). Balance of £0.430m currently remaining.
• Allocate the balance of £0.430m to the B714 Upgrade.
• Investigate the potential to resource the delivery of the
investment fund priorities through future years place based
funding allocations and external funding applications.
Flexibility  • Allocate £0.377m to B714 Upgrade
Capital Receipts
Uncommitted Capital Receipts: Anticipated capital receipts of £5.555m
have been identified. Following the deduction of abnormal and other
costs, a balance of £1.348m is now available for utilisation to support
capital investment.
• Allocate £1.348m to B714 Upgrade.
Total reallocation £5.0m 
23

Page 24

24

Page 25

NORTH AYRSHIRE COUNCIL 
29 August 2023 
Cabinet 
Title:    Revenue Budget 2023/24 : Financial Performance to 30 June
2023 
Purpose:  To advise Cabinet of the financial performance for the Council
at 30 June 2023. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; 
(c) note the potential impact of the review of Strathclyde
Pension Fund on future budget pressures; and 
(d)  approve the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2023/24 were approved by Council on 1
March 2023. The Housing Revenue Account (HRA) Revenue Budget for 2023/24 was
approved by Council on 15 February 2023. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the first report for 2023/24 and covers the period to the end of June
2023 (Period 3). Projections have been made to the year-end. 
1.3   At Period 3 the General Fund is forecasting a net in-year overspend of £0.802m,
(0.2%), after transferring resources to/from earmarked reserves. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£6.363m),
(11.0%). 
1.5  The Health and Social Care Partnership is projecting a year-end overspend of
£4.576m, (1.6%), for 2023/24. The Council services element is reporting a projected
overspend of £3.837m and the Health services element is reporting a projected
overspend of £0.739m. 
Agenda Item 6
25

Page 26

1.6 Significant risks to the reported position have been identified arising from ongoing
inflationary pressures across services, linked to the higher than anticipated Consumer
Price Index, and the potential impact of the ongoing 2023/24 non teacher pay
negotiations. However, it is anticipated that any additional costs arising from these
negotiations will be matched by additional Scottish Government grant funding. 
1.7 Following completion of the triennial review of Strathclyde Pension Fund’s assets and
liabilities, it is anticipated that the current level of employers’ contribution will be
reviewed with a view to a potential reduction in employers’ contributions from 2024/25.
Officers will continue to monitor developments and any projected cost reductions will
be reported within the Medium Term Financial Plan 2024/25 to 2026/27 later in the
year. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2023/24. In addition to the budget approved
on 1 March 2023, earmarked funds of £26.697m were carried forward from 2022/23
for service expenditure in 2023/24 and are reflected in the figures within the 2023/24
financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year overspend of £0.802m, (0.2%),
net of transfers to/from reserves, is anticipated for the year to 31 March 2024. 
2.3 Details of the current financial projections are summarised in the following table: 
26

Page 27

2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that included in the approved budget, as detailed in the
following table: 
Appendix
No
Annual
Budget
Projection
to  31
March 2024
Projected
Variance
for year
(Fav)/Adv Note
Service Expenditure £000's £000's £000's
Chief Executives 1 19,915     19,857      (58)          (i)
Communities 2 183,363   183,363     -              (ii)
Place 3 54,087     55,778      1,691       (iii)
Other Corporate Services 4 17,266     16,435      (831)        (iv)
Sub Total 274,631   275,433     802        
Health and Social Care
Partnership 8 121,493   121,493     -              2.6
Balance for Services 396,124   396,926     802        
Financing Charges 5 12,730     12,730      -             
Contribution to Loans Fund
Reserve 5 4,811       4,811        -             
Total Planned Expenditure 413,665   414,467     802        
Planned Income
Aggregate External Finance 5 (342,784)  (342,784)    -             
Council Tax 5 (65,495)    (65,495)     -              (v)
Use of Earmarked Funds 5 (5,386)      (5,386)       -             
Total Planned Income (413,665)  (413,665)    -             
Net Expenditure/ (Income) -              802           802        
Non Domestic
Rates
Specific
Grants TOTAL AEF
Planned Income £000's £000's £000's
Approved Budget 1 March 2023 (276,338)       (40,982)         (19,495)         (336,815)      
Movements:
Settlement Adjustment 257              257             
Early Learning and Childcare (218)             6                  (212)            
HSCP Adult Social Care (2,821)           (2,821)          
HSCP - CJSW 1                  1                 
DHP Allocation (2,752)           (2,752)          
PEF carry forward 2022/23 (442)             (442)            
Revised Planned Income (281,872)       (40,982)         (19,930)         (342,784)      
General Revenue
Grant
£000's
27

Page 28

2.5 Commentary on Significant Movements from the Approved Budget 
The Council's overall financial forecast against the revised budget is a net overspend 
position. This includes a number of movements at a service level. A brief explanation
of the significant movements from the previous forecasts are outlined as follows: 
(i) Chief Executive’s – underspend of (£0.058m) 
The underspend is primarily related to vacancy management within Democratic
Services. 
(ii) Communities – breakeven 
The breakeven position reported to 30 June reflects a range of overspends,
offsetting underspends and utilisation of earmarked reserves across the services. 
These are primarily related to: 
• Increased residential childcare and external day placements, £0.978m;
• An under-recovery of commercial catering and school meal income within
Facilities Management, £0.561m; and
• A projected overspend on Teachers HQ cover costs, £0.400m. 
These have been offset by: 
• Vacancy management across services, combined with a targeted reduction in
overtime and casual staff costs, (£0.934m);
• Reduced Supplies & Services costs within Facilities Management linked to
reduced commercial catering activity and school meal uptake, (£0.653m); and 
• A net increase in income recovery across services, (£0.225m). 
Virements in relation to the allocation of Early Years employee and third party
payments budgets have been included within Appendix 7. 
(iii) Place – overspend of £1.691m 
The overspend is primarily related to: 
• Additional operating costs within Waste Services, including associated costs
pressures within Internal Transport, related to additional service demands and
the impact of high staff absence levels, £1.157m;
• Cost pressures within Internal Transport arising from inflationary pressures,
including increased contractor costs, £0.240m;
• A projected under-recovery of property income, £0.119m;
• Increased utility cost pressures, £0.117m; and 
• Costs in relation to community hubs within Sheltered Housing Units, £0.112m. 
Virements in relation to the realignment of initial budgets across services and
additional income received in relation Employability and Regeneration have been
included within Appendix 7.
28

Page 29

(iv) Other Corporate Items – underspend of (£0.831m) 
The underspend is primarily related to centrally held inflationary cost provisions
which are being applied to offset the pressures reported across other services.
The impact of inflation will continue to be monitored throughout the year. 
(v) Council Tax – breakeven 
The breakeven position reported reflects increased expenditure in relation to
Council Tax Reduction claims, £0.395m, offset by reduced bad debt provision and
the utilisation of centrally held provisions. 
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of June 2023 is
attached at Appendix 8. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised below: 
• The projected outturn is a year-end overspend of £4.576m for 2023/24.
• The projected overspend on the Council Services element is £3.837m over the
same period with a projected overspend on the Health Services element of
£0.739m;
• The most significant areas of overspend include residential placements for
children, supplementary staff in wards and complex residential care packages
within the lead partnership for mental health.  Further detail is included in the
report at Appendix 8. 
As a contingency, the IJB set aside £2m within reserves at the end of 2022/23 in
anticipation of budget pressures during 2023/24. This funding reduces the current
projected overspend to £2.576m. 
The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with
the available resource. A recovery plan is being developed for presentation at the next
IJB meeting. 
The IJB also holds a General Fund reserve balance of £6.448m of unallocated funds,
this would underwrite the risk of the remainder of the projected overspend if it cannot
be managed downwards in the coming months.  This would be a last resort as this
funding is non-recurring and it does not resolve the areas underlying the projected
overspend. 
The main areas of risk identified include:
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers;
• High risk areas of low volume / high-cost services areas e.g. Children’s residential
placements, Learning Disability care packages and complex care packages; 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this;
29

Page 30

• Ongoing implementation costs of the Scottish Government policy directives;
• Lead / hosted service arrangements, including managing pressures and reporting
this across the 3 IJBs;
• The impact on Lead Partnership and acute services from decisions taken by other
Ayrshire areas;
• The Covid recovery process including the ability to change and improve services
following learning from the Covid response;
• Continuing risks associated with provider sustainability;
• The Local Government pay award is not settled for 2023-24 and negotiations are
ongoing, any increase above the budgeted 3% will impact on the financial position
unless additional funding is forthcoming. 
These risks will be monitored during 2023-24 and any impact reported through the
financial monitoring report 
Risks 
2.7 Significant risks to the reported position have been identified arising from inflationary
pressures in relation to essential commodities, including food, and contractor costs. In
June 2023, Cabinet agreed to earmark £0.870m from the 2022/23 underspend to
address unbudgeted inflationary pressures arising from the ongoing cost of living
crisis. Any further increases beyond current budget provision may impact on future
service provision. 
Negotiations in relation to the 2023/24 pay settlement for non-teaching staff are
currently ongoing. It is anticipated that any additional costs arising from these
negotiations will be matched by additional Scottish Government grant funding,
however, the final impact of any award in excess of available funding may require the
utilisation of Council reserves, with a knock-on effect on future budget gaps. 
Future Budget Developments 
2.8 As noted in the Unaudited Annual Accounts for 2022-23, presented to Council on 21
June 2023, Strathclyde Pension Fund has reported a significant increase in the value
of fund assets driven by improved returns and increased yields on corporate bonds
during 2022-23. Following completion of the triennial review of the Fund’s assets and
liabilities, it is anticipated that the current level of employers’ contribution will be
reviewed with a view to a potential reduction in employers’ contributions. Although it is
not anticipated that this review will impact on current year contributions, any reduction
in the level of employers’ contributions will result in a reduction in net budget
pressures for 2024/25 and beyond. Officers will continue to monitor developments and
any projected cost reductions will be reported within the Medium Term Financial Plan
2024/25 to 2026/27 later in the year. 
30

Page 31

Housing Revenue Account 
2.9  The Housing Revenue Account budgeted for a breakeven position in 2023/24 and an
in-year underspend of (£6.363m), (11.0%), is currently anticipated for the year to 31
March 2024. The projected position is summarised in the following table with further
details provided in Appendix 6.   
2.10 Commentary on Significant Movements from the Approved Budget 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Capital Financing – underspend of (£6.363m) 
The underspend is due to lower than anticipated loan charges as a result of
profiling within the HRA Capital programme. These funds will be required to
support the re-phased HRA capital programme in future years. 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a)  note the information and financial projections outlined in the report; 
(b)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; 
(c) note the potential impact of the review of Strathclyde Pension Fund on future
budget pressures; and
(d)  approve the virements detailed in Appendix 7. 
Annual
Budget
Projection to 
31 March
2024
Projected
Variance for
year
(Fav)/Adv Note
£000's £000's £000's
Employee Costs 6,146        6,146          -                 
Property Costs 22,466      22,466        -                 
Supplies and Services 570          570             -                 
Transport and Plant Costs 36            36              -                 
Administration Costs 1,899        1,899          -                 
Third Party Payments 2,861        2,861          -                 
Transfer Payments 172          172             -                 
Other Expenditure 380          380             -                 
Capital Financing 23,309      16,946        (6,363)          (i)
Gross Expenditure 57,839      51,476        (6,363)         
Income (57,839)     (57,839)       -                 
Net Expenditure -               (6,363)         (6,363)         
31

Page 32

4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 30 June 2023 is a net overspend of £0.802m. 
Housing Revenue Account
The net projection for the year as at 30 June 2023 is a net underspend of (£6.363m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
General Services Revenue Estimates 2023/24 to 2025/26 - Council 1 March 2023
Housing Revenue Account (HRA) Capital Investment Programme, Revenue Budget and
Rent Levels for 2023/24 – Council 15 February 2023
32

Page 33

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 201              205              4                     2%
Total for Chief Executive 201              205              4                     2%
Financial Services
Change Programme 8                  8                  -                      0%
Audit, Fraud, Safety & Insurance 682              707              25                   4%
Corporate Procurement 974              943              (31)                  (3%)
Financial Services 1,450           1,450           -                      0%
Revenues (500)             (500)             -                      0%
Transformation 740              754              14                   2%
Total for Financial Services 3,354           3,362           8                     0%
People & ICT
Employee Services 898              898              -                      0%
HR & Organisational Development 1,074           1,074           -                      0%
ICT 5,309           5,309           -                      0%
Business Support 1,258           1,258           -                      0%
Customer Services 3,948           3,948           -                      0%
Total for People & ICT 12,487         12,487         -                      0%
Democratic Services
Legal & Licensing 496              482              (14)                  (3%)
Policy, Performance & Elections 488              431              (57)                  (12%) 1         
Communications 469              473              4                     1%
Civil Contingencies 60                60                -                      0%
Committee Services 554              543              (11)                  (2%)
Member Services 1,339           1,346           7                     1%
Ayrshire Support Service 410              418              8                     2%
Information Governance 57                50                (7)                    (12%)
Total for Democratic Services 3,873           3,803           (70)                  (2%)
Totals 19,915         19,857         (58)                  (0%)
33

Page 34

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 16,886         16,806         (80)                  (0%)
Property Costs 68                68                -                      0%
Supplies and Services 3,058           3,058           -                      0%
Transport and Plant Costs 25                25                -                      0%
Administration Costs 1,332           1,337           5                     0%
Other Agencies & Bodies 1,958           1,958           -                      0%
Transfer Payments 853              853              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 24,180         24,105         (75)                  (0%)
Income (4,265)          (4,248)          17                   (0%)
Net Expenditure 19,915         19,857         (58)                  (0%)
34

Page 35

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Democratic Services - Policy, Performance & Elections
447 (57) -13% Employee Costs - There is an underspend of £0.057m due to vacancy management.
(57)                 
35

Page 36

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 20,773         20,775            2                     0% 1         
Primary Education 48,062         47,667            (395)                (1%) 2         
Secondary Education 61,230         61,184            (46)                  (0%) 3         
Additional Support Needs 13,649         14,285            636                 5% 4         
Education - Other 4,805           4,971              166                 3% 5         
Pupil Equity Fund 4,604           4,604              -                      0%
Facilities Management 17,658         17,295            (363)                (2%) 6         
Connected Communities 12,582         12,582            -                      0% 7         
Net Total 183,363       183,363          -                      0%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 95,738         96,176            438                 0%
Employee Costs - Non Teachers 55,613         54,381            (1,232)             (2%)
Property Costs 1,409           1,363              (46)                  (3%)
Supplies and Services 25,611         25,213            (398)                (2%)
Transport and Plant Costs 168              170                 2                     1%
Administration Costs 515              500                 (15)                  (3%)
Other Agencies & Bodies 13,100         14,122            1,022              8%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 78                71                   (7)                    (9%)
Gross Expenditure 192,812       192,576          (236)                (0%)
Income (9,449)          (9,213)             236                 (2%)
Net Expenditure 183,363       183,363          -                      0%
36

Page 37

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
2 Other minor movements.
A reduction to the budget of £1.198m in 23/24 has necessitated a drawdown from Education earmarked funds
pending permanent savings to be implemented for 24/25. Service redesign proposals are being developed.
2
Note 2 Primary Education
45,654 (384) -1% Employee Costs : projected underspend in non teaching costs across all Primary Schools
- (11) Other minor movements
(395)
Note 3 Secondary Education
46,642 (50) 0% Employee Costs : projected underspend in non teaching costs across all Secondary Schools
4 Other minor movements
(46)
Note 4 ASN
11,830 (255) -2% Employee costs:  Projected underspend of £0.255m in non teaching staff costs across all ASN school and
bases provision.
355 (70) -20% There is a forecasted underspend of £0.070m on payments to Other Local Authorities due to a reduction in the
number of NAC children accessing placements in their establishments.
1,003 42 4% There is a projected overspend of £0.042m on external day placements as a result of additional children
requiring this level of support and an increase in rates from these establishments.
499 936 188%
There is a projected overspend of £0.936m on external specialist residential placements.  Currently there are 9
children in accommodation with an additional 3 expected in the near future; 2 children have left education
provision in June 2023.  Increased pressures on internal care settings as well as changing needs of children
and young people have resulted in an increase in the need for external residential settings. Joint working is
ongoing with HSCP to ensure that all options are fully explored in both education and care to determine the
appropriate level of care and education provision to deliver positive outcomes for children and young people.  
- (17) Other minor movements.
636
Note 5 Education Other
3,462 348 10% Employee costs: projected overspend in Teachers HQ Cover of £0.400m offset by underspends in HQ
employee costs of £0.051m
1,252 9 1% Third Party Payments: overspends across various subscriptions
1,121 (191) -17% Income: PPP insurance rebate £0.075m, PPP deductions of £0.085m in excess of budget, £0.017m salaries
received from capital and £0.014m school let income
166
Note 6 Facilities Management
13,285 (194) -1%
Employee Costs: There is an underspend of £0.194m due to recruitment challenges and a targeted reduction
of overtime and casual costs. There is an overspend of £0.023m within commercial catering attributed to
Lochshore cafe.
6,403 (653) -10%
Supplies and Services: There is a underspend of £0.059m in commercial catering costs and a further
underspend in food of £0.347m due to reduced school meal uptake.  School meal surveys have been issued to
primary and secondary schools and the results will be used to inform menus and service provision for the new
school year. Promotional activities including a radio campaign and social media posts are also planned. Any
increased school meal activity will reduce the level of underspends shown above. In addition, there is an
underspend within Early Years of £0.247m which has arisen due to a lower attendance rate than originally
anticipated.
3,053 484 16%
Income: There is an under-recovery in commercial catering income of £0.395m due to a reduction in
commercial events and cost/income challenges within commercial venues, and an under-recovery of school
meal income of £0.166m. This is partially offset by an over-recovery of cleaning and janitorial income of
£0.076m.
(363)
37

Page 38

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 7 Connected Communities
7,217 (111) -2% Employee Costs: Underspends in Community Facilities, Libraries, Country Parks and Community Development
due to vacancy management.
174 52 30% Supplies and Services: small overspends across a number of budget lines
(962) 42 -4% Income: £0.080m under recovery in Community Facilities as income has not returned to pre-covid levels and
projected over-recovery of £0.038m in Arran Outdoor Education Centre
- 17 Other minor movements.
-
38

Page 39

Appendix 3
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 194              194               -                     0%
Housing and Public Protection
Building Services (2,543)          (2,543)           -                     0% 1         
Property Governance (7)                 (7)                  -                     0%
Planning Services 322              322               -                     0%
Protective Services 1,736           1,736            -                     0%
Other Housing 2,562           2,509            (53)                 (2%) 2         
Total for Housing and Public Protection 2,070           2,017            (53)                 (3%)
Commercial Services
Roads 7,396           7,446            50                   1% 3         
Streetscene 5,117           5,117            -                     0%
Waste Resources 9,612           10,690          1,078              11% 4         
Total for Commercial Services 22,125         23,253          1,128              5%
Economic Development, Growth and
Regeneration
Economic Policy 201              201               -                     0%
Employability & Skills 1,955           1,982            27                   1%
Regeneration 1,221           1,221            -                     0%
Business 954              954               -                     0%
Growth & Investment 216              216               -                     0%
Total for Economic Development, Growth and
Regeneration 4,547           4,574            27                   1%
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,565           1,639            74                   5% 5         
Housing Assets & Investment (1)                 (1)                  -                     0%
Property Maintenance 3,494           3,494            -                     0%
Property Running Costs 4,728           4,850            122                 3% 6         
Energy and Sustainability 5,194           5,268            74                   1% 7         
Internal Transport 10,171         10,490          319                 3% 8         
Total for Sustainability, Transport and Corporate
Property 25,151         25,740          589                 2%
Net Total 54,087         55,778          1,691              3%
39

Page 40

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 46,380         47,063          683                 1%
Property Costs 21,417         21,604          187                 1%
Supplies and Services 9,699           9,842            143                 1%
Transport and Plant Costs 7,498           8,081            583                 8%
Administration Costs 774              771               (3)                   (0%)
Other Agencies & Bodies 17,020         17,018          (2)                   (0%)
Transfer Payments -                   -                    -                     0%
Other Expenditure 182              166               (16)                 (9%)
Capital Financing -                   -                    -                    
Gross Expenditure 102,970       104,545        1,575              2%
Income (48,883)        (48,767)         116                 (0%)
Net Expenditure 54,087         55,778          1,691              3%
40

Page 41

Appendix 3a
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
(2,543) - -
Building Services are projecting a break-even position at period 3.  However there remain significant
challenges facing the Housing Revenue Account in relation to property costs, particularly void repairs, which
would have an impact on Building Services. The position is being monitored.
-
Note 2 Other Housing
3,839 (53) (1%) Employee Costs: projected underspend of £0.053m due to vacancy management.
(53)
Note 3 Roads
2,873 61 2%
Supplies and Services: After drawing down £0.656m budget from contingency and earmarked funds, there
remains a projected overspend of £0.043m on street lighting and traffic signal energy costs, which is due to
inflation. Further forecasted overspend of £0.010m on software licences and small overspends across the
service.
(11) Other minor movements.
50
Note 4 Waste Services
5,132 769 15%
Employee Costs: The overspend is attributed to additional resources to deal with new builds and to cover a
significant, and challenging, sickness absence rate. The statutory nature of the service requires additional
resources to cover unforeseen absences. A robust absence monitoring process is in place and an overall
review of the Waste service in light of legislative changes and current service demands is ongoing. This will
also take account of waste compositional analysis.
482 82 17% Supplies & Services: Forecast overspends on Refuse containers £0.052m and Trade effluent £0.025m.
160 255 159% Transport Costs: Additional vehicles are in place to deal with pressures from new builds and seasonal
demands in Garden Waste, however some of these vehicles will be removed from October 2023.
(28) Other minor movements
1,078
Note 5 Property Management and Investment
2,582 (45) (2%) Employee Costs: A projected underspend of £0.045m due to vacancy management.
(1,263) 119 (9%) Income: There is a projected under-recovery in fee income of £0.119m.
74
Note 6 Property Running Costs
6,349 112 2% Property Costs: due to associated costs for community hubs within SHUs.
10 Other minor movements
122
Note 7 Energy and Sustainability
8,262 74 1%
Property Costs: Due to the current energy crisis and after drawing down the maximum available £3.048m from
contingencies and earmarked funds there is a projected overspend in property costs of £0.074m due to
increased utility cost charges.
A number of workstreams are ongoing to reduce consumption to reduce the above tariff related increases and
as part of our overall sustainability strategy.
74
Note 8 Internal Transport
4,668 171 4% Transport Provision Costs: Projected overspend of £0.171m due to an increase in contractors operating and
running costs which has resulted in higher contract pricing.
385 79 21% External Hires: Projected overspend of £0.079m which is mainly due to additional hire of vehicles, due to
pending delivery of replacement vehicles.
1,117 70 6% Repairs & Maintenance: Projected overspend of £0.070m in repairs and maintenance which is due to price
increases and maximising the life of assets due to the increased lead time for replacement vehicles.
(1) Other minor movements
319
41

Page 42

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,257 2,242 (15)               (1%)
SPT Concessionary Fares 286 291 5                  2%
Ayrshire Joint Valuation Board 965 932 (33)               (3%)
3,508 3,465 (43)               (1%)
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
11,531 10,710 (821)             (7%) 1           
Housing Benefits (19)               14                33                -174%
17,265 16,434 (831)             (5%)
42

Page 43

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Other Corporate Items
11,531 (821)               -7%
The projected underspend is primarily related to centrally held inflationary cost provisions  which are being
applied to offset pressures reported across other services. The impact of inflation will continue to be monitored
throughout the year.
(821)
43

Page 44

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 12,730 12,730 - -
Contribution to Loans Fund Reserve 4,811 4,811 - -
Scottish Government Funding (342,784) (342,784) - -
Council Tax (65,495) (65,495) - - 1
Use of Earmarked Funds (5,386) (5,386) - -
Net Total (396,124) (396,124) - -
There has been a significant increase in the value of CTR claims received in the first quarter of 2023/24, £0.395m.
This has been offset by reduced bad debt provision and the utilisaton of centrally held cost of living provisions.
Following the impact of the Cost of Living Allowance distributed during 2022/23, Council Tax collection rates have
reduced to levels which are in line with pre pandemic performance.
Note 1 Council Tax
44

Page 45

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 6,146 6,146 - 0%
Property Costs
Responsive Repairs 7,293 7,293 - 0%
Void Repairs 3,576 3,576 - 0%
Planned and Cyclical Maintenance 5,041 5,041 - 0%
Aids and Adaptions 1,617 1,617 - 0%
Other property costs 4,939 4,939 - 0%
Total for Property Costs 22,466 22,466 - 0% 1
Supplies & Services 570 570 - 0%
Transport Costs 36 36 - 0%
Administration Costs 1,899 1,899 - 0%
Third Party Payments 2,861 2,861 - 0%
Transfer Payments 172 172 - 0%
Other Expenditure 380 380 - 0%
Capital Financing Costs 23,309 16,946 (6,363) (27%) 2
Gross Expenditure 57,839 51,476 (6,363) (11%)
Income
Council House Rents (56,803) (56,803) - 0%
Other Rents (332) (332) - 0%
Recharges (474) (474) - 0%
Other Income (230) (230) - 0%
Total Income (57,839) (57,839) - 0%
Net Expenditure - (6,363) (6,363)
45

Page 46

Appendix 6a
HRA
BUDGETARY CONTROL 2023/24
REPORT FOR THE 3 MONTHS TO 30 JUNE 2023
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
22,466 0 0%
0
Note 2
23,309 6,363 27%
6,363
B/fwd from
2021/22
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/23
£m £m £m £m £m £m
4.709 - - 6.363 (4.065) 7.007
1.500 - - - - 1.500
5.000 - - - - 5.000
0.198 - - - - 0.198
0.123 - - - - 0.123
0.781 - - - - 0.781
0.416 - - - - 0.416
0.052 - - - - 0.052
0.636 - - - - 0.636
0.270 - - - - 0.270
13.685 - - 6.363 (4.065) 15.983
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works
Section
Capital Financing Costs
There is a projected underspend in capital financing costs of £6.363m due to lower than anticipated loan charges. 
This is due to the profiling within the HRA Capital budget. The underspend will be reflected in the Business Plan
which is currently being reviewed.
Property Costs
No variance is projected at period 3 however there remains significant pressures on the property cost budgets and
particularly in relation to void repairs.  The position will continue to be monitored and an update will be provided at
period 5.
HRA reserves and balances
46

Page 47

Appendix 7
1) Budget Virements
Place
Streetscene - Transport Costs P 0.066
Streetscene - Supplies and Services P 0.062
Streetscene - Third Party Payments P 0.020
Streetscene - Income P -0.148
Waste - Supplies & Services P 0.080
Waste - Third Party Payments P 0.120
Waste - Income P -0.200
Waste - Third Party Payments - realignment of budgets to reflect current position T 0.610
Waste - Third Party Payments - realignment of budgets to reflect current position T -0.610
Regeneration - Third Party Payments T 0.308
Regeneration - Employee Costs T 0.017
Regeneration - Supplies and Services T 0.007
Regeneration - Income T -0.332
Employability - Income P 0.193
Employability - Supplies and Services P 0.048
Employability - Admin Costs P -0.006
Employability - Employee Costs P -0.103
Employability - Third Party Payments P -0.132
Employability Grants - Employee Costs T 0.878
Employability Grants - Third Party Payments T 1.970
Employability Grants - Supplies and Services T 0.060
Employability Grants - Admin Costs T 0.010
Employability Grants - Income T -2.918
0.000
Early Years - Funded Providers Provision P -0.242
Early Years - Employee Costs P 0.242
0.000
Communities
Budget Management - 30 June 2023
Virement/Budget Adjustment Requests
2023/24
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m
47

Page 48

Appendix 8
Integration  Joint Board
24th August 2023
Subject : 2023-24 – Month 3 Financial Performance
Purpose : To provide an overview of the IJB’s financial performance as at
month 3 (June).
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected year-
end overspend of £4.576m;
(b) notes the progress with delivery of agreed savings;
(c) notes the remaining financial risks for 2023-24; and
(d) approves the budget reductions which are detailed at
paragraph 2.10. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected expenditure
and income commitments; these have been prepared in conjunction with relevant
budget holders and services.   It should be noted that, although this report refers to
the position at the end of June, further work is undertaken following the month end to
finalise projections, therefore the projected outturn position is as current and up to
date as can practicably be reported.
48

Page 49

Appendix 8
1.2  The projected outturn is a year-end overspend of £4.576m (1.6%) for 2023-24.  This
includes the financial impact of the NHS pay award but excludes the Council pay
award. 
1.3  From the core projections, overall, the main areas of pressure are residential
placements for children, supplementary staff in wards and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 3 
At month 3 against the full-year budget of £285.076m there is a projected year-end
overspend of £4.576m (1.6%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £3.837m in social care services and a projected
overspend of £0.739m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
East and South HSCP do not report at month 3 so the impact of their Lead Partnership
services is not included in this report. 
2.3 Health and Community Care Services 
Against the full-year budget of £89.901m there is a projected overspend of £0.616m
(0.7%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£0.171m. The projected costs reflect the recently agreed National Care Home
Contract (NCHC) rates. 
The budgeted number of permanent placements is 780 and at month 3 there are 771
placements.  The projection assumes that the current number of placements will
continue to increase to 780 placements by the end of the year. Within the projection
49

Page 50

Appendix 8
there is an assumption that recent placements which do not have a completed
financial assessment (often due to the pressure to discharge from hospital) are costed
with 50% of the cases at the current average cost of a placement and 50% at the
gross or interim funded rate.  It is likely that there will still be some cases being gross
or interim funded at the year end. Their actual cost will not be known until the financial
assessment is completed and this can impact on the final position. 
The level of income recovered from charging orders is assumed to be online based
on the income received to date.   This income is not easy to project as it depends on
the length of the legal process and time taken to sell the property that the charging
order is registered to. 
b) Care at home (in house and purchased) is projected to be £0.637m underspent. 
The position is made up of an underspend in in-house services of £1.145m as
there are vacant posts, but some of the current capacity is being met by existing
staff working additional hours and casual staff.  Bank staff are being offered
contracts and additional staff are being recruited which will replace the need for
existing staff to work additional hours. This is partly offset by an overspend in
purchased services of £0.508m as the budget was reduced to reflect the additional
costs of bringing some services in-house after the provider withdrew from the
contract. 
c) Reablement services are projected to be £0.121m underspent due to vacancies. 
d) Care at Home Charging Income is projected to under recover by £0.080m due to
an ongoing shift towards personal care which is non chargeable. 
e) Physical Disability Care Packages (including residential and direct payments) -
projected underspend of £0.152m in community care packages, £0.292m
underspend in direct payments and £0.611m overspend for residential
placements. There is also an under-recovery of income of £0.135m.  There will be
a further review of these projections in month 4 to focus on areas where there are
unused hours or clawback of direct payments.   
f) Anam Cara is projected to overspend by £0.177m due to covering vacancies and
sickness absence (£0.121m) and under-recovered income (£0.056m).     
g) Integrated Island Services is projected to be £0.163m underspent. This is mainly
due to a projected underspend in care at home costs of £0.198m.. There is also
an overspend in supplies and cleaning costs of £0.075m. 
h) District Nursing is projected to overspend by £0.225m due to an overspend on
bank nursing costs and supplies.   
i) Rehab wards are projected to overspend by £0.265m (Redburn ward £0.215m
overspent and Douglas Grant £0.050m overspent).  The overspend is due to cover
50

Page 51

Appendix 8
costs for vacancies as well as supplementary staffing for patients who require one
to one support.   
j) Wards 1 and 2 are projected to overspend by £0.750m due to increased use of
supplementary staffing.   
k) Cumbrae Lodge Continuing Care beds are projected to underspend by £0.150m
due to a reduced charge to reflect the reduction in beds used during the transition
to the new service. 
2.4 Mental Health Services 
Against the full-year budget of £101.049m there is a projected overspend of £1.898m
(1.9%) prior to the reallocation of the Lead Partnership overspend to East and South
HSCP.  This also excludes any potential variance on the Mental Health Recovery and
Renewal Funding where any underspend will be earmarked at the year-end for use in
2024-25. The main variances are: 
a) Learning Disabilities are projected to overspend by £0.691m and the main
variances are: 
• Care Packages (including residential and direct payments) - projected
underspend of £0.310m in community care packages and projected
overspends of £0.497m in direct payments and £0.684m for residential
placements.   
• Trindlemoss non-employee costs are projected to underspend by £0.075m. 
b) Community Mental Health services are projected to underspend by £0.203m which
is mainly due to an underspend of £0.218m in community packages (including
direct payments) and an overspend in residential placements of £0.083m.   
c) The Lead Partnership for Mental Health is projecting to be £1.410m overspent and
the main variances are as follows: 
• A projected overspend in Adult Inpatients of £0.600m due to overspends in
supplementary staff, staff in redeployment, staff cover due to sickness (inc
covid outbreak) and reduced bed sale income.  
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.067m based on current number of placements and enhanced costs
remaining until the year end. These placements are for individuals with very
specific needs that require a higher level of security and/or care from a staff
group with a particular skill set/competence.  There are no local NHS secure
facilities for women, people with a learning disability or people with
neurodevelopmental disorder. This can necessitate an UNPACs placement
with a specialist provider which can be out-of-area.  The nature of mental health
UNPACs spend is that it is almost exclusively on medium or long term complex
secure residential placements which are very expensive so a small increase in
51

Page 52

Appendix 8
placements can have a high budgetary impact. Due to the complexity and risk
involved, transitions between units or levels of security can take many months.
Applications to approve a placement are made to the Associate Medical
Director for Mental Health who needs to be satisfied that the placement is
appropriate and unavoidable prior to this being agreed. 
• A projected overspend in MH Pharmacy of £0.118m due to an increase in
substitute prescribing costs. 
• Learning Disability Services are projected to overspend by £0.426m due to high
usage of supplementary staffing, cross-charging for a LD patient whose
discharge has been delayed and redeployment staffing costs. Supplementary
staffing costs relate to backfill for sickness, increased and sustained enhanced
observations and vacancies.  The enhanced observations are reviewed on a
daily basis.
• Elderly Inpatients are projected to overspend by £0.240m due to the use of
supplementary staffing.  
• The Innovation Fund is projected to underspend by £0.229m due to slippage
within some of the projects and not all of the funding was allocated.
• Addictions in patients are projected to overspend by £0.150m due to the use of
supplementary staffing.  
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.035m in 2023-24, further
information is included in the table below: 
The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• CAMHS £0.592m
• Mental Health Admin £0.376m
• Psychiatry £0.348m
• Psychology £0.495m
• Associate Nurse Director £0.097m 
Vacancy Savings Target (£0.873m)
Projected to March 2024 £1.908m
Over/(Under) Achievement £1.035m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £39.191m there is a projected overspend of £5.615m
(14.3%) and the main variances are: 
52

Page 53

Appendix 8
a) Care Experienced Children and Young People is projected to overspend by
£5.628m. The main areas within this are noted below: 
• Children’s residential placements are projected to overspend by £5.700m. We
started 2023/24 with 32 external placements and there are currently 36
placements which are assumed to continue until the end of the year.  Within
the £5.700m there is £0.250m relating to enhanced costs for two placements. 
There are a number of factors leading to this challenging position:
• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100%+ occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum Seeking Children
(UASC) under the National Transfer Scheme and to support Trafficked
young people located in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their Educational
needs, the cost of Residential School Placements in the most cases is
shared 50/50 with Education services. 
Children’s Services are continuing to work with other services including
Education and Housing to address the challenges. A change programme is
being developed to respond to the pressures of residential care, further detail
of the scope and plan around this work will be presented to a future IJB. 
• Looked after and Accommodated Children (fostering, adoption, kinship etc) is
projected to be £0.361m underspent based on the current number of
placements. 
b) Children with disabilities – residential placements are projected to overspend
by £0.245m. This is based on 8 current placements and 2 further placements
which are expected to commence during September.  Direct payments are
projected to underspend by £0.139m. 
c) Residential respite – placements are projected to overspend by £0.049m.   
These short-term placements are used to prevent an admission to full
residential care.  There is one short term placement, but this could vary
throughout the year and have an impact on the projection. 
d) Children’s Houses Employee Costs – are projected to overspend by £0.100m
due to additional overtime costs. 
e) Head of Service – is projected to overspend by £0.305m which is mainly due
to the saving of £0.233m in relation to the staff reconfiguration in the children’s
53

Page 54

Appendix 8
houses which is not expected to be fully achieved in 23-24.  There are also
projected costs of £0.092m for the JII (Joint Investigative Interview) project
which is not funded. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line.  All
underspends in employee costs have been taken as payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.379m mainly due to a projected underspend in
the Carers Strategy funding.
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.959m and the
main areas of underspend are: 
• An over-recovery of payroll turnover of £0.723m for social care services and an
over-recovery of payroll turnover of £0.261m for health services as outlined in
the table below.
• The Band 2 to Band 3 regrading costs are still being worked through but there
is £0.700m set aside to cover this as part of the agreed 23/24 budget paper.
This is included as an underspend as the overspends have been included in
the services above. An update on the adequacy of this provision will be
provided in future reports.
• There is projected slippage on the LD and MH transition funding of £0.380m
due to delays in children transitioning into adult services. 
The turnover targets and projected achievement for the financial year for Health and
Social Care services outwith the Lead Partnership is noted below: 
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £0.934m (31% of annual target) has been
achieved to date.   
Social Care Health
Services
Vacancy Savings Target (3.014m) (1.433m)
Projected to March 2024 3.737m 1.694m
Over/(Under) Achievement 0.723m 0.261m 
The health vacancy projection to the year-end is based on the month 3 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
54

Page 55

Appendix 8
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
The main areas at month 3 are: 
• Children and Families £0.275m
• Learning Disability £0.029m
• Management and Support   £0.098m
• Community Care Service Delivery £0.091m
• Rehab and Reablement £0.099m
• Locality Services £0.115m
• Integrated Island Services £0.132m 
There have been no intentional plans to pause or delay recruitment and services have
actively continued to recruit; in some service areas it has proven difficult to fill posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2023-24 budget included £4.963m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 3
£m
Red - 0.273
Amber 2.245 2.182
Green 2.718 2.508
Blue - -
TOTAL 4.963 4.963 
b) The main area to note is that previous amber savings of £0.273m, relating to
the reconfiguration of staffing within Children and Families, have been
escalated to red.  Progress to date suggests that the timescale for this saving
will not be met and the full £0.273m will not be achieved in 2023-24 but this is
accounted for in the projected outturn.   
Work is ongoing to refresh the Transformation Plan to focus on the financial
challenges which the Partnership expects to face in 2024/25 and 2025/26. The plan
is critical to the ongoing sustainability of service delivery. Once it has been endorsed
by the Transformation Board it will be included within future financial monitoring
reports. The Transformation Board also has responsibility for overseeing the delivery
of the plan and for ensuring that projects remain on track. 
55

Page 56

Appendix 8
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis…. without
the express consent of the Integration Joint Board.” 
Appendix C highlights the movement in the budget position following the initial
approved budget. 
Reductions Requiring Approval:
1)  Transfer to IT re software costs  £0.012m
2)  Transfer to Capital re West Road £0.300m 
Any NHS reductions will be reported in month 4. 
2.11 Pan  Ayrshire Lead Partnership services and  Large Hospital Set Aside 
Lead Partnerships: - The IJB outturn position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis; this position is currently the default pending
further work to develop a framework to report the financial position and risk sharing
across the 3 Partnerships in relation to hosted or lead service arrangements, which
has been delayed by the requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
require to be shared with North. At Month 3 the MH lead partnership is projected to
overspend by £1.410m (£0.462m NRAC share for East and £0.403m for South). South
and East HSCP do not report until month 4. 
Set Aside: - preparatory work is well underway with NHS Ayrshire and Arran and the
other Ayrshire partnerships to progress and develop the set aside arrangements to
fully implement the legislative requirement.  This includes arrangements in relation
to the use of Directions, Joint Commissioning Plans and overall progression towards
fair share allocations of resources. The North budget for set aside resources for
2023-24 is £35.547m.  This is based on the 2023-23 figure of £34.850m inflated by
the 2023-24 uplift of 2%.   
The annual budget for Acute Services is £409.9m.  The directorate is overspent by
£6.8m after 3 months. This caused by increasing overspends on agency medical and
nursing staff, together with increasing drug expenditure. These have been required
due to the level of operational pressure being experienced, in common with many
56

Page 57

Appendix 8
other areas in Scotland. Several unfunded wards are open across both main hospital
sites. 
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• High numbers of delayed discharges and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
2.12 FINANCIAL RECOVERY PLAN 
The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with
the available resource. 
As a contingency there is provision of £2m non-recurring funding set aside in the
reserves (appendix D) to contribute towards the 2023-24 position.   This would reduce
the current projected overspend to £2.576m. 
A financial recovery plan is being developed to address the main areas of overspend
and to identify further areas which can contribute to bringing the position back into
line, this will be brought to next IJB meeting with the Month 4 financial report. 
The IJB also holds a General Fund reserve balance of £6.448m of unallocated funds,
this would underwrite the risk of the remainder of the projected overspend if it cannot
be managed downwards in the coming months.  This would be a last resort as this
funding is non-recurring and it does not resolve the areas underlying the projected
overspend. 
2.13 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2023-24
budget during the year, these include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this.
• Ongoing implementation costs of the Scottish Government policy directives
57

Page 58

Appendix 8
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The Covid recovery process including the ability to change and improve
services following learning from the Covid response.
• Continuing risks associated with provider sustainability.
• The Local Government pay award is not settled for 2023-24 and negotiations
are ongoing; any increase above the budgeted 3% will impact on the financial
position unless additional funding is forthcoming. 
These risks will be monitored during 2023-24 and any impact reported through the
financial monitoring report.
2.14 RESERVES 
The IJB reserves position is summarised in the table below with full detail of the
opening position given in Appendix D. 
The ‘free’ general fund balance of £6.448m is held as a contingency balance, this
equates to around 2.3% of the initial approved IJB budget for 2023-24 which is which
is within, but towards the lower end, of the target range of 2%-4%. 
General Fund
Reserves Earmarked Reserves
Total  Debt to
NAC Free GF  External
Funding                      HSCP 
£m £m  £m £m £m
Opening Balance - 1 April 2023 - 6.448  6.997 4.219 17.664
2023-24 Draw Per the Budget
Paper - -  (1.252) - (1.252)
Current Reserve balances - 6.448  5.745 4.219 16.412 
The 2023-24 budget approved the use of £1.252m of previously earmarked reserves
to support a balanced budget position for 2023-24. The HSCP earmarked reserves
also includes an amount of £2.0m which was agreed to support the financial position
during 2023-24. 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2023-24 from
within the available resource, thereby limiting the financial risk to the funding partners. 
3.3 Measuring Impact 
58

Page 59

Appendix 8 
Ongoing updates to the financial position will be reported to the IJB throughout 2023-
24. 
4. IMPLICATIONS 
4.1 Financial
The financial implications are as outlined in the report.   Against the full-year budget
of £285.076m there is a projected overspend of £4.576m. The report outlines the main
variances for individual services.  
4.2 Human Resources
The report highlights vacancy or turnover savings achieved to date. Services will
review any staffing establishment plans and recruitment in line with normal practice
when implementing service change and reviews as per agreement with the IJB, there
is no intention to sustain the staffing capacity reduction on a recurring or planned
basis.
4.3 Legal
None.
4.4 Equality/Socio-Economic
None.
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
4.6 Community Wealth Building
None.
4.7 Key Priorities
None.
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran Director
of Finance and North Ayrshire Council’s Head of Finance after the report has been
finalised for the IJB. 
Caroline Cameron, Director
Author – Paul Doak, Head of Finance and  Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@nroth-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk] 
59

Page 60

PUBLIC INFORMATION
2023-24 Budget Monitoring Report–Objective Summary as at 30th June        Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 70,156 69,498 (658) 19,745 21,019 1,274 89,901 90,517 616
: Locality Services 28,157 28,233 76 6,148 6,378 230 34,305 34,611 306
: Community Care Service Delivery 36,577 35,849 (728) 0 0 0 36,577 35,849 (728)
: Rehabilitation and Reablement 2,206 2,207 1 0 0 0 2,206 2,207 1
: Long Term Conditions 944 1,108 164 10,952 11,817 865 11,896 12,925 1,029
: Community Link Workers 197 188 (9) 0 0 0 197 188 (9)
: Integrated Island Services 2,075 1,913 (162) 2,645 2,824 179 4,720 4,737 17
MENTAL HEALTH SERVICES 29,692 30,180 488 71,357 72,767 1,410 101,049 102,947 1,898
: Learning Disabilities 22,864 23,555 691 542 542 0 23,406 24,097 691
: Community Mental Health 5,942 5,739 (203) 1,623 1,623 0 7,565 7,362 (203)
: Addictions 886 886 0 1,784 1,784 0 2,670 2,670 0
: Lead Partnership Mental Health NHS Area Wide 0 0 0 67,408 68,818 1,410 67,408 68,818 1,410
CHILDREN & JUSTICE SERVICES 34,627 40,087 5,460 4,564 4,719 155 39,191 44,806 5,615
: Irvine, Kilwinning and Three Towns 3,184 3,101 (83) 0 0 0 3,184 3,101 (83)
: Garnock Valley, North Coast and Arran 3,188 3,013 (175) 0 0 0 3,188 3,013 (175)
:Intervention Services 1,885 1,801 (84) 440 440 0 2,325 2,241 (84)
: Care Experienced Children & Young people 22,655 28,283 5,628 0 0 0 22,655 28,283 5,628
: Head of Service - Children & Families 1,075 1,380 305 0 0 0 1,075 1,380 305
: Justice Services 2,412 2,279 (133) 0 0 0 2,412 2,279 (133)
: Universal Early Years 228 230 2 3,698 3,853 155 3,926 4,083 157
: Lead Partnership NHS Children's Services 0 0 0 426 426 0 426 426 0
CHIEF SOCIAL WORK OFFICER 1,852 1,473 (379) 0 0 0 1,852 1,473 (379)
PRIMARY CARE 0 0 0 53,406 53,350 (56) 53,406 53,350 (56)
ALLIED HEALTH PROFESSIONALS 0 0 0 10,176 10,176 0 10,176 10,176 0
COVID NHS 0 0 0 0 (275) (275) 0 (275) (275)
MANAGEMENT AND SUPPORT COSTS 5,271 4,216 (1,055) (17,227) (18,131) (904) (11,956) (13,915) (1,959)
FINANCIAL INCLUSION 1,457 1,438 (19) 0 0 0 1,457 1,438 (19)
OUTTURN ON A MANAGED BASIS 143,055 146,892 3,837 142,021 143,625 1,604 285,076 290,517 5,441
Return Hosted Over/Underspends East 0 0 0 0 (462) (462) 0 (462) (462)
Return Hosted Over/Underspends South 0 0 0 0 (403) (403) 0 (403) (403)
OUTTURN ON AN IJB BASIS 143,055 146,892 3,837 142,021 142,760 739 285,076 289,652 4,576
TOTAL
Partnership Budget - Objective Summary
Council Health
2023/24 Budget
60

Page 61

PUBLIC INFORMATION 
2023-24 Savings Tracker            Appendix B 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 3
2023/24
Saving
Description of the Saving
1 Staffing reconfiguration - children &
families
Amber Red 273,000     Review staffing provision within children’s houses with the saving
phased over 2023/24 and 2024/25 – 50/50
2 Deliver the Strategic Plan objectives for
Older People's Residential Services -
Reduction in Care Home Places
Amber Amber 1,000,000  Month 10 placements are 762 and are projected to rise to 770 by
the year end. The budget for 23/24 would fund an average 780
places at the current split of nursing/residential (60/40).  This
reflects reduced demand and investment in CAH to support more
people at home. Implications – possible use of waiting list to
manage numbers.
3 Care Home Respite Amber Amber 560,000     All respite care to be provided in-house at Anam Cara and
Montrose House and any use of other respite provision funded via
Carers budget.    Implications – reduction in use of other care
homes for respite places
4 Montrose House Capacity Green Amber 210,000     Amend registration from 30 beds to 20 beds across 2 staffed wings. 
This will be supported by introduction of intermediate care beds at
Arran War Memorial Hospital.
5 Reconfigure respite provision at Anam
Cara
Amber Amber 112,000     The service is currently relocated to Taigh Mor (8 beds) on a
temporary basis and this proposal would reduce capacity from 14
beds to 9 beds in one wing when it reverts to Anam Cara.
6 Trindlemoss pool running costs Green Green 85,000       Trindlemoss Pool has never opened due to ongoing maintenance
issues.  The historic budgeted running costs are £0.085m but it is
expected actual costs would be much higher.  The pool will not
open and alternative therapies will be provided e.g. bounce
therapy.
7 Trindlemoss Day Care Green Green 168,932     Trindlemoss day opportunities staffing was restructured during
2021/22 and 2022/23.  This saving has already been achieved and
will remove the additional staffing budget.
8 Intermediate Placement Scheme -
cessation of service
Green Green 30,000       The contract has ceased and will not be renewed.
9 Carers Act Funding - Substitution of
Spend
Green Green 500,000     There is a plan in place to invest across carer service contract,
preparation of carer plans, short breaks and other support to
carers.  This proposal will invest £0.500m in contributions to Red
Rose House, Roslin House, Anam Cara, waiving of charges and
day services.
Children, Families & Criminal Justice
Community Care & Health
Mental Health
Other Areas
61

Page 62

PUBLIC INFORMATION 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 3
2023/24
Saving
Description of the Saving
10 Payroll Turnover - increase to target (social
care)
Green Green 1,000,000  22/23 Month 10 – projecting turnover savings £4.414m v target
£2.014m resulting in a projected overachievement of target in 22/23
of £2.4m.  Saving based on less than 50% of this year’s
overachievement
11 Income Generation - 5% Increase to fees and
charges
Green Green 46,600       Implement a 5% increase to fees and charges and a 5% increase to
the maximum charge.  The impact will be limited where service
users are already paying the maximum charge.  Social care
charges are means-tested with the exception of community alarms
13 Review the contingency funds Green Green
12 Staffing Reconfiguration - Finance and
Transformation
Green Green 35,091       Saving released through management and admin structure change
TOTAL SOCIAL CARE SAVINGS 4,020,623 
Health:
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 3
Approved
Saving                  
2023/24          
£m
Description of the Saving
13 Payroll Turnover - Health Lead
Partnership
Green Green 392,245     22/23 Month 10 – projecting turnover savings £2.182m v target
£0.481m resulting in a projected overachievement of target in 22/23
of £1.701m.  The saving is based on less than 25% of this year’s
overachievement
14 Payroll Turnover - Health Non Lead
Partnership
Green Green 250,000     22/23 Month 10 – projecting turnover savings £1.789m v target
£1.183m resulting in a projected overachievement of target in 22/23
of £0.606m. The saving is less than 50% of this year's
overachievement.
15 Reprovisioning of Continuing Care beds Amber Amber 300,000     Currently provided through Cumbrae Lodge Care Home in Irvine
but the provider does not want to continue to provide the service. 
Plans are being developed to relocate the service to Taigh Mor in
Beith with an anticipated saving of £0.3m.
21 Inflationary increase to East HSCP re
Woodland View beds
Green Green -           
TOTAL HEALTH SAVINGS 942,245    
4,962,868  TOTAL NORTH HSCP SAVINGS
Other Areas
62

Page 63

PUBLIC INFORMATION
2023-24 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     121.408
Less Living Wage Fund not yet
allocated      (2.826)
Revised Budget     118.582
Resource Transfer 1-3 P 21.562
HSCP Fin Circ 3 1-3 T 0.013
Living Wage - final allocation  1-3 P 2.808
ICT Licences Various 1-3 P (0.012)
Island Funds  1-3 T 0.015
Facilities Management Costs -
Montrose House 1-3 P 0.387
West Road - Capital funded from
Revenue  1-3 T (0.300)
Social Care Budget Reported at Month 3 143.055 
63

Page 64

64

Page 65

NORTH AYRSHIRE COUNCIL 
29 August 2023 
Cabinet 
Title:    Capital Programme and Treasury Management Performance
to 30 June 2023 
Purpose:  To advise Cabinet of progress in delivering the Capital
Investment Programme 2023/24 and the associated Treasury
Management performance to 30 June 2023. 
Recommendation:  That Cabinet agrees to:
(a)  note the revisions to budgets outlined in the report; 
(b)  note (i) the General Services and HRA revised budgets at 30
June 2023; and (ii) the forecast expenditure to 31 March
2024; 
(c) approve the virement proposals noted within the HRA
programme detailed in appendix 2; 
(d)  note the additional investment of £5.000m to support the
B714 upgrading project as detailed in paragraphs 2.12 and
2.13; and
(e)  note the estimated performance against the Prudential
Indicators set out in the Treasury Management and
Investment Strategy.
.
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2023/24 to 2030/31 was
approved by Council on 1 March 2023. The Housing Revenue Account (HRA) Capital
Investment Programme 2023/24 sits within the updated HRA Business Plan and was
approved by Council on 15 February 2023. 
1.2  This report identifies the current programme for 2023/24, taking account of
adjustments made to the initial budgets. The report presents the revised budgets at 31
June 2023 (Period 3) and forecast expenditure to 31 March 2024. 
1.3   At Period 3 the General Fund is forecasting a net underspend of (£0.236m) against a
revised budget of £107.252m. The HRA is forecasting a projected underspend of
(£0.638m) against a revised budget of £59.655m. 
Agenda Item 7
65

Page 66

1.4  Within the General Fund, adjustments to funding have resulted in net additions to the
overall capital programme of £3.401m, including Scottish Government funding in
relation to the Place Based Investment, Nature Restoration and Road Safety
Improvement programmes. In addition, following the Local Government Finance
Settlement, the Scottish Government has withdrawn the previously announced capital
funding to support the expansion of Universal Free School Meals, pending a review of
the rollout of the expansion. This has resulted in a £1.954m increase in Prudential
Borrowing in order to maintain the agreed investment level. 
1.5 Reviews of individual project plans have identified a number of adjustments to the
current profiles. As a result, (£31.179m) has been reprofiled for delivery in 2024/25
and beyond. This has been partly offset by the previously reported re-profiling of
£14.941 from 2022/23 to 2023/24 and the acceleration of £4.158m to 2023/24 from
future years. 
1.6 Within the HRA, a review of delivery timescales has identified a requirement to re-
profile (£122.978m) of works for delivery in 2024/25 and beyond. This is partly offset
by £10.212m previously re-profiled from 2022/23 to 2023/24 and the acceleration of
£0.105m to 2023/24 from future years. 
1.7 The major risk to the forecast position is the uncertainty arising from the ongoing
inflationary pressures, supply chain issues, which are impacting on tender returns and
the cost of materials, and continued increases in the cost of borrowing. Some
mitigation has been built into the programme to offset cost pressures and supplement
the Loans Fund. However, any further significant increase in costs will result in
increased borrowing requirements and may have a negative impact on the
deliverability of both the General Fund and HRA capital programmes for 2023/24 and
beyond. Projects will continue to be monitored closely with cost increases met initially
from the additional flexibility built into the programme. However, any requirement for
further borrowing not met from a funding source will be a matter for Council to
consider. 
1.8 As noted by Council on 1 March 2023, the ongoing review of capital funding had
identified that no additional funding was being made available by the UK Government
to address the additional cost risks in relation to the upgrading of the B714. The
estimated additional costs have now been quantified at £5.000m over the period to
February 2026. Proposals in relation to the additional investment are detailed in a
separate report to Cabinet and will be drawn from a combination of reviewing existing
commitments from the Council Investment and Renewal and Recovery Funds,
allocating anticipated capital receipts not currently committed and utilisation of existing
resources from within the current programme. 
1.9 The Treasury Management and Investment Strategy (TMIS) for 2023/24 was
approved by Council on 1 March 2023 and detailed the key performance indicators
under the Prudential Code for Capital Finance in Local Authorities (2021 edition). The
current estimated performance indicates that North Ayrshire Council has operated
within the treasury limits and performance indicators set out in the TMIS and the
current capital investment plans remain affordable. 
66

Page 67

2. Background 
General Fund 
2.1 The following table outlines the movements in the 2023/24 General Services budget: 
2.2 (a) Changes to Funding 
The capital programme has been updated to reflect the following changes to funding: 
2023/24
£m
Budget as at 1 March 2023 115.931   
a) Changes to Funding 1.140        
b) Other Revisions to the Programme 2.261        
Revised Budget 119.332   
c) Alterations to phasing of projects:-
2022/23 to 2023/24 14.941     
2023/24 to 2024/25 (31.179)         
2024/25 to 2023/24 4.158        
Budget as at 30 June 2023 107.252   
Funding Body Amount Project
Scottish Government £0.761m Place Based Investment Programme
Scottish Government £0.355m Nature Restoration Fund
Scottish Government £0.216m Road Safety Improvement Fund
Scottish Government £0.030m Cycling, Walking and Safer Roads
Scottish Government (£1.954m) Withdrawal of UFSM expansion grant
UK Government £0.202m Shared Prosperity Fund
SPT £0.050m Ardrossan Harbour Interchange
SPT £0.350m Cumbrae Ferry & Bus Stop
SPT £0.100m Bus Corridor Improvements
SPT £0.050m Irvine Friendly Cycle Town
SPT £0.080m Brodick to Corrie Cycle Path
SPT £0.400m B714 Active Travel Links
Sustrans £0.500m Nature Restoration Fund
Total £1.140m
67

Page 68

2.3 (b) Other Revisions to the Programme 
The programme has also been updated to reflect the undernoted adjustments: 
2.4 (c) Alterations to the Phasing of Projects 
The reprofiling of £14.941m from 2022/23 to 2023/24 reflects projects not completed
within the year, or accelerated from future years, and incorporated within the 2023/24
capital programme. These were previously reported within the 2022/23 Capital
Programme performance reports: 
Funding Source Amount Project
Borrowing £1.954m Additional borrowing to offset grant withdrawn
CFCR £0.300m Funding for 47 West Road
Receipts £0.007m Insurance recoveries (Vehicles)
Total £2.261m
Service Amount Project
Communities £0.146m CO2 Monitors
£0.139m Lockhart Campus
(£0.636m) Moorpark PS
£0.148m Other minor adjustments
(£0.203m)
Chief Executives £0.243m ICT Projects
£0.243m
HSCP £0.363m Residential & Respite
£0.168m Carefirst Replacement
£0.157m Improvement Grants
£0.020m Other minor adjustments
£0.708m
68

Page 69

Service Amount Project
Place £1.572m Place Based Investment Programme
£0.788m Ardrossan Promenade
£0.768m Upper Garnock FPS
£0.724m Millport Coastal FPS
£0.712m Fleet Decarbonisation
£0.693m AGD Projects
£0.602m Vacant & Derelict Land Funding
£0.540m Islands Pit Stops
£0.435m Vehicles
£0.434m Millport Town Hall Phase 2
£0.431m Industrial Portfolio
£0.418m PLI Projects
£0.417m Lighting
£0.400m Annickbank - V&DL Investment Programme
£0.398m Solar PV - Nethermains
£0.356m Nature Restoration Fund
£0.350m CCTV Review
£0.323m B714 Improvements
£0.275m Solar PV - Shewalton
£0.246m Gallowgate Toilets
£0.241m A737 Dalry Trunk Road
£0.238m BUILD Project
£0.221m Millport Town Hall Regeneration
£0.214m Saltcoats Old Cal Railway Ph 1
£0.206m Town Centre Regeneration
£0.175m Access Paths
£0.170m Parking / DPE
£0.157m Emergency Control Centre
£0.154m LED Lighting
£0.154m Cycling / Walking /Safer Streets
£0.140m Island Infrastructure Fund
£0.126m Renewal of Play Parks
£0.116m Irvine high Street
£0.112m Lochshore Garnock Hub
£0.110m Repurposing Property Grant Fund
£0.107m Lochshore
£0.104m Montgomerie Park Masterplan
(£0.145m) Bridges Infrastructure
£0.607m Other minor adjustments
£14.089m
Other £0.104m Flexibility Fund
£0.104m
Total £14.941m
69

Page 70

A further review of individual project plans, taking cognisance of the current levels of
volatility within the construction sector, has identified a requirement to re-profile
(£31.179m) of works for delivery in 2024/25 and beyond. This includes a corporate
phasing adjustment reflecting the degree of uncertainty in the total expenditure
projections: 
These adjustments have been partly offset by the acceleration of £0.588m of
expenditure to 2023/24 from future years. 
2.5 These adjustments have resulted in a revised 2023/24 budget at 30 June 2023 of
£107.252m. 
Service Amount Project
Chief Executives (£0.150m) ICT Projects
(£0.150m)
Place (£1.918m) AGD Projects
(£0.300m) Ardrossan Cemetery Extension
(£0.068m) Other minor adjustments
(£2.286m)
Corporate (£27.513m) Sensitivity Adjustment
(£1.230m) Flexibility
(£28.743m)
Total (£31.179m)
Service Amount Project
Communities £1.230m Moorpark Primary
£2.305m Montgomerie Park School
£3.535m
Place £0.428m B714 Upgrade
£0.112m Cemetery Programme
£0.083m Other minor adjustments
£0.623m
Total £4.158m
70

Page 71

2.6 The following graph illustrates the movement in each programme on a service basis
compared to the revised programme: 
2.7  The impact on budgeted funding, elements of which are related to the profile of
expenditure reported above, is a reduction of £11.091m from the revised budget,
including: 
18.349 0.799 0.757 93.126 2.900 115.931
21.681 0.892 2.265 107.802 (25.388) 107.252
3.332 0.093 1.508 14.676 (28.288) (8.679)
Approved Programme
Movement
Programme @ P3
Category Amount Comments
Borrowing £16.649m Rephased aligned to projected expenditure
CFCR (£0.300m) Additional CFCR Contribution
Capital Grants (£5.199m) Rephased and additional government grants
Other Grants (£2.464m) Rephased and revised contributions
Capital Receipts (£0.007m) Realigned capital receipts
Total £8.679m
71

Page 72

2.8 Projected Capital Expenditure to 31 March 2024 
The projections are summarised by service in the following table:   
2.9 An underspend of (£0.236m) is projected within the General Fund capital programme
for 2023/24 arising from revisions to the BUILD project, which is subject to a separate
report to Cabinet. These funds will be transferred to the Flexibility budget to offset
anticipated budget pressures elsewhere in the programme. Information on the
progress of all projects can be found in Appendix 1. 
2.10 Although not formally reflected in the financial performance reports at this time due to
ongoing uncertainty, areas of cost risk have been identified as a result of cost volatility
arising from the ongoing inflationary pressures, outstanding contractor claims and
supply chain issues which are impacting on tender returns and the cost of materials
across a number of projects. Specific projects where cost risks have been identified,
or are anticipated, include Moorpark Primary, Montgomerie Park Primary, Ardrossan
Campus, Upper Garnock Flood Prevention Scheme, Millport Coastal Flood Prevention
Scheme, Largs Sea Wall, Ardrossan North Shore and Ardrossan Harbour
Interchange. While some mitigation has been built into the Capital Programme in the
form of flexibility budgets, totalling £10m over the next few years, cost pressures may
exceed this provision. These risks will be quantified as individual projects are
completed and tendering exercises are finalised, with the impact on the costs of the
programme being monitored and reported to Cabinet as appropriate. It is recognised
however, with a significant budget gap being forecast for 2024/25 and to limit any
additional unfunded borrowing, any costs in excess of the current level of flexibility
provision will require to be funded from existing resources. 
Approved
Budget
2023/24
Budget
Revisions
Carry
Forwards
and
Adjustments
Revised
Budget
2023/24
Projected
Expenditure
/ Income to
31 March
2024
Projected
Variance
Over /
(Under)
£m £m £m £m £m £m
Expenditure
Communities 18.349 - 3.332 21.681 21.681 -
Chief Executive 0.799 - 0.093 0.892 0.892 -
Health and Social Care Partnership 1.257 0.300 0.708 2.265 2.265 -
Place 92.018 3.101 12.683 107.802 107.566 (0.236)
Other including Flexibility 3.508 - (28.896) (25.388) (25.388) -
Total Expenditure 115.931 3.401 (12.080) 107.252 107.016 (0.236)
Income
General Capital Grant (35.704) 1.368 - (34.336) (34.336) -
Specific Capital Grant (9.401) (1.055) (5.512) (15.968) (15.968) -
Capital Funded from Current Revenue - (0.300) - (0.300) (0.300) -
Capital Receipts (0.466) (0.007) - (0.473) (0.473) -
Other Grants & Contributions (2.068) (1.530) (0.934) (4.532) (4.532) -
Prudential Borrowing (68.292) (1.877) 18.526 (51.643) (51.407) 0.236
Total Income (115.931) (3.401) 12.080 (107.252) (107.016) 0.236
72

Page 73

2.11 In addition to the risks identified in relation to individual projects, significant financing
risks continue to be identified in relation to the overall affordability of the capital
investment programme due to the increased cost of borrowing. As reported to Council
on 1 March 2023, the programme is currently affordable based on the estimated
funding streams and the actions agreed by Council to supplement the Loans Fund.
The ongoing cost risk will continue to be monitored and a full assessment of
affordability will be included in the next major review of the capital programme due for
completion during 2023/24. 
2.12 As noted by Council on 1 March 2023, the UK Government previously confirmed that
North Ayrshire Council had been awarded £23.693m from the Levelling Up Fund to
support the upgrading of the B714 to improve connectivity between North Ayrshire
and the wider motorway network. The report highlighted that additional costs were
anticipated in relation to this project, although no additional funding was being made
available form the UK Government. Following a review of the costs involved in the
delivery of the project, together with appropriate value engineering, it has been
determined that an additional investment of £5.000m is required. 
2.13 In view of the current pressures and areas of risk and uncertainty being experienced
in relation to the capital investment programme, there is no capacity to support
increased borrowing costs to support additional investment. However, a review of
existing commitments from the Investment and Recovery & Renewal Funds,
additional allocations from anticipated capital receipts not currently committed and the
proposed utilisation of existing resources from within the current programme has
identified the following funds available for investment:  
Recovery & Renewal Fund:  
Stimulating Start Up and
Early Stage Business Growth
£1.000m Full original allocation of £1.000m
released. Future development to be
supported through specific grant
funding from the Place Based
Investment Programme and the Shared
Prosperity Fund.
Investment Fund:  
Community Wealth Being -
Community and Town
Centres
£0.857m Original allocation of £1.200m to be
reduced to £0.343m. Additional specific
grant funding from the Place Based
Investment Programme, VDLF and
identification of other potential funding
sources to be utilised to deliver original
policy intent. 
Commercial
Estate/Infrastructure/Town
Centre Investment
£0.988m Original allocation of £1.155m to be
reduced to £0.167m. Additional specific
grant funding from the Place Based
Investment Programme, VDLF and
identification of other potential funding
sources to be utilised to deliver original
policy intent. 
73

Page 74

Existing Capital Resources:  
Industrial Portfolio £0.430m Reallocation of existing budget – no
current commitments
Flexibility £0.377m Allocation from current Flexibility
budget.
Capital Receipts:  
Uncommitted Capital
Receipts
£1.348m Anticipated capital receipts of £5.555m
have been identified. Following the
deduction of abnormal and other costs,
a balance of £1.348m is now available
for utilisation to support capital
investment.
Total Additional Investment £5.000m 
Housing Revenue Account 
2.14 The following table outlines the movements in the 2023/24 HRA Capital budget: 
2.15  (a) Alterations to the Phasing of Projects 
£10.212m of planned expenditure has been reprofiled from 2022/23 to 2023/24,
reflecting projects not completed within the year which have been incorporated within
the 2023/24 capital programme. These were previously reported within the 2022/23
Capital Programme performance reports: 
2023/24
£m
Budget as at 15 February 2023 172.316     
a) Alterations to phasing of projects:-
2022/23 to 2023/24 10.212       
2023/24 to 2024/25 (122.978)         
2024/25 to 2023/24 0.105         
Budget as at 30 June 2023 59.655       
74

Page 75

Category Amount Project
New Builds £1.548m House Building General
£1.022m Contingency
£0.855m Harbourside
£0.543m Corsehillhead
£0.525m Afton Court
£0.335m Largs Police Station
£0.323m Caley Court
£0.302m Flatt Road
£0.233m Acquisitions
£0.231m Friars Lawn
(£0.114m) James Reid
£0.083m Other minor adjustments
£5.886m
Improvements £2.321m EWI
£2.273m Solar Panels
£0.223m Window
£0.180m Energy Efficiency
£0.094m Saltcoats MSF
(£0.120m) Kitchen
(£0.505m) Insulated Rendering
(£1.207m) Bathroom
(£1.303m) Fullarton Regeneration
£0.014m Other minor adjustments
£1.970m
Other Capital Works £2.369m Demolitions
£0.207m Health & Safety
£0.063m Sheltered Housing
(£0.298m) Regeneration Programme
£0.015m Other minor adjustments
£2.356m
Total £10.212m
75

Page 76

A review of the timescale for delivery of capital projects has identified a requirement to
re-profile (£122.978m) of works for delivery in 2024/25 and beyond, including: 
This has been partly offset by the acceleration of £0.105m of project expenditure for
delivery during 2023/24, including: 
2.16 These adjustments have resulted in a revised 2023/24 budget at 30 June 2023 of
£59.655m. 
Category Amount Project
New Builds (£34.671m) Ayrshire Central
(£26.166m) Montgomerie Park
(£9.033m) James Reid
(£7.593m) Garnock Academy
(£7.337m) Fullarton Street
(£6.093m) Stanecastle
(£4.780m) Regeneration Project 1d
(£3.908m) James MacFarlane
(£3.894m) Bourtreehill Village
(£2.874m) Laburnum Avenue / Newhouse Drive
(£1.660m) Glebe Place
(£1.465m) Corsehillhead
(£1.098m) Regeneration Project 1e
(£0.931m) Kings Arms
(£0.572m) Nelson Street Regeneration
(£112.075m)
Improvements (£0.945m) Kitchens
(£0.821m) Smoke Detector Programme
(£0.228m) Electrical Rewiring
(£1.994m)
Other Capital Works (£8.555m) Sheltered Housing
(£0.354m) Lift Replacement
(£8.909m)
Total (£122.978m)
Category Amount Project
New Builds £0.085m Harbourside
£0.020m Other minor adjustments
£0.105m
Total £0.105m
76

Page 77

2.17 The impact on budgeted funding is a reduction of £29.986m in the drawdown of
Capital Grants and reduced Prudential Borrowing aligned to the revised programme: 
2.18  Projected Capital Expenditure to 31 March 2024 
The projections are summarised in the following table:   
2.19 A variance of (£0.638m) is projected within the HRA capital programme for 2023/24
arising from revisions to a number of projects, including: 
Category Amount Comments
Capital Grants £29.986m Reduction aligned to projected expenditure
Borrowing £82.675m Reduction aligned to projected expenditure
Total £112.661m
Approved
Budget
2023/24
Carry
Forwards
and
Adjustments
Revised
Budget
2023/24
Projected
Expenditure /
Income to 31
March 2024
Projected
Variance
Over /
(Under)
Service £m £m £m £m £m
Expenditure
Housing Revenue Account 172.316 (112.661) 59.655 59.017 (0.638)
Total Expenditure 172.316 (112.661) 59.655 59.017 (0.638)
Income
CFCR (5.151) - (5.151) (5.151) -
Capital Grants (44.979) 29.986 (14.993) (14.993) -
Use of Reserves (4.065) - (4.065) (4.065) -
Affordable Housing Contribution (2.445) - (2.445) (2.445) -
Prudential Borrowing (115.676) 82.675 (33.001) (32.363) 0.638
Total Income (172.316) 112.661 (59.655) (59.017) 0.638
Project Variance Comments
Brathwic Terrace £0.125m Previous underspend overstated
Springvale £0.108m Previous underspend overstated
Dalrymple Place £0.017m Previous underspend overstated
Heating (£0.552m) Scope of works reduced
Health & Safety (£0.207m) Budget no longer required
St Michael's Wynd (£0.101m) Previous overspend overstated
Asbestos (£0.017m) Budget no longer required
Major Improvements (£0.006m) Budget no longer required
Newhouse Drive (£0.005m) Budget no longer required
Total (£0.638m)
77

Page 78

2.20 In addition to the adjustments noted above Appendix 2 highlights a number of
proposed virements which are required to transfers budgets between individual
projects and align the budgets with the projected expenditure. 
2.21 Further cost pressures resulting from inflationary and supply chain issues continue to
be monitored and a review of the potential impact on the Business Plan and Capital
Programme will be undertaken to address any identified issues. Further information
on the progress of all projects can be found in Appendix 2. 
Treasury Management and Investment 
2.22 The Prudential Code for capital finance in local authorities (2021 edition) requires the
Council to set and monitor performance against specified prudential indicators.  The
indicators for the current year were set out in the Treasury Management and
Investment Strategy 2023/24, approved by Council on the 1 March 2023.  A summary
of the key indicators and our current estimated performance against them is shown in
the following table. Further details of all the Prudential and Treasury indicators can be
found in appendix 3. 
2.23 (a) Loans Capital Financing Requirement 
The Loans Capital Financing Requirement (CFR) is the underlying borrowing
requirement of the Council. This is currently lower than the approved estimate as a
result of the change in profile of the capital programmes highlighted within this report. 
2.24 (b) Gross Borrowing 
Gross Borrowing is projected to be lower than anticipated due to the revised profile of
capital projects and the continued use of internal funds, the latter being a key element
of the Treasury Management Strategy to minimise costs. 
Prudential and Treasury Indicators
2023/24
Approved
Estimate
£m
2023/24
Revised
Estimate
£m
Movement
£m
(a) Loans Capital Financing Requirement
General Services 267.879 270.543 2.664
HRA 284.275 190.569 (93.706)
Total 552.154 461.112 (91.042)
(b) Gross Borrowing 490.154 372.112 (118.042)
(c) Operational Boundary for Borrowing 571.667 480.138 (91.529)
Authorised Limit for Borrowing 628.834 528.152 (100.682)
Total Operational Boundary (incl. PPP/NPD) 659.399 567.870 (91.529)
Total Authorised Limit (incl. PPP/NPD) 716.566 615.884 (100.682)
(d) Investments 20.000 20.000 -
78

Page 79

2.25 (c) Operational Boundary 
The Operational Boundary is the maximum which the Council anticipates borrowing to
fund the current year capital programme, building in flexibility for the timing of the
different funding streams and principal repayments.  The in-year variance is linked to
the continued use of internal funds and the re-profiling of the capital programme. 
2.26 (d) Investments 
It is estimated that the Council will maintain an average balance of £20.000m of
internally managed funds and utilise cash balances during the year in support of the
under-borrowed position.  The internally managed funds are primarily invested in call
accounts with banks, Money Market Funds and other UK local authorities. 
2.27 It is critical that the Council ensures that its capital investment plans are affordable. 
Affordability of borrowing is measured by the percentage of financing costs relative to
the net revenue stream of the General Fund and Housing Revenue Account (HRA). 
As at 30 June, the estimated percentages for 23/24 are 2.8% and 21.4% for the
General Fund and HRA respectively.  Capital expenditure impacts on the revenue
budget through financing charges so it is essential the Council ensures the financing
costs remain affordable and do not constitute an excessive proportion of the revenue
resources available. From a General Fund perspective, the Scottish Local Authority
average in 2021/22 was 5.5%, therefore demonstrating a prudent borrowing policy.
For the HRA, the Scottish average was 22.7%. The level of loan charges is deemed
prudent and affordable within the framework of the 30 year Housing business plan. 
3. Proposals 
3.1 That Cabinet agrees to:
(a)  note the revisions to budgets outlined in the report; 
(b)  note (i) the General Services and HRA revised budgets at 30 June 2023; and (ii)
the forecast expenditure to 31 March 2024; 
(c) approve the virement proposals noted within the HRA programme detailed in
appendix 2; 
(d)  note the additional investment of £5.000m to support the B714 upgrading project
as detailed in paragraphs 2.12 and 2.13; and
(e)  note the estimated performance against the Prudential Indicators set out in the
Treasury Management and Investment Strategy. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Expenditure will continue to be
closely monitored to ensure early action is taken regarding any projected
underspends or overspends. 
Human Resources 
4.2 None.
79

Page 80

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by focusing our
investment on priorities, managing risk and supporting delivery of key priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Capital Investment Programme 2023/24 to 2030/31 - Council 1 March 2023
Housing Revenue Account (HRA) Capital Investment Programme, Revenue Budget and
Rent Levels for 2023/24 – Council 15 February 2023 
Treasury Management and Investment Strategy 2023/24 – Council 1 March 2023 
80

Page 81

APPENDIX 1
TOTAL PROJECT
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Brought / Carry
Forward to 2024/25
Total Revised
Budget 2023/24
Year to Date Budget
2023/24
Actual Expenditure to
30 June 2023
Year to date
Variance 2023/24
Projected Expenditure
to 31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend
£ £ £ £ £ £ £ £ £ £ £ £ £
EXPENDITURE
Communities
Nursery Education 16,368,237 15,896,227 16,368,237 0 568,862 0 568,862 0 96,852 96,852 568,862 0 0
Primary Schools 44,655,442 11,166,669 44,655,442 0 11,977,694 3,534,602 15,512,296 0 2,999,016 2,999,016 15,512,296 0 0
Secondary Schools 83,010,742 4,189,004 83,010,742 0 5,072,285 0 5,072,285 0 272,329 272,329 5,072,285 0 0
Special Education 25,343,637 25,239,710 25,343,637 0 138,595 0 138,595 0 34,668 34,668 138,595 0 0
Schools Other 880,194 393,639 880,194 0 728,737 0 728,737 0 242,182 242,182 728,737 0 0
Information & Culture 113,479 6,563 113,479 0 106,916 0 106,916 0 0 0 106,916 0 0
Completed Projects 43,419,379 43,394,998 43,419,379 0 3,679 0 3,679 0 (20,702) (20,702) 3,679 0 0
SUB TOTAL 213,791,110 100,286,809 213,791,110 0 18,596,768 3,534,602 22,131,370 0 3,624,345 3,624,345 22,131,370 0 0
Chief Executive
Council IT Strategy 8,797,380 2,652,103 8,797,380 0 1,041,645 (150,000) 891,645 0 168,369 168,369 891,645 0 0
SUB TOTAL 8,797,380 2,652,103 8,797,380 0 1,041,645 (150,000) 891,645 0 168,369 168,369 891,645 0 0
Health & Social Care
Management & Support 2,350,596 790,721 2,350,596 0 1,226,875 0 1,226,875 0 0 0 1,226,875 0 0
Housing Non HRA 656,571 159,758 656,571 0 656,571 0 656,571 0 159,758 159,758 656,571 0 0
Adults 4,608,078 4,590,097 4,608,078 0 18,047 0 18,047 0 66 66 18,047 0 0
Young People 5,579,718 5,223,534 5,579,718 0 363,177 0 363,177 0 6,993 6,993 363,177 0 0
SUB TOTAL 13,194,962 10,764,109 13,194,962 0 2,264,670 0 2,264,670 0 166,817 166,817 2,264,670 0 0
Place
Roads 107,944,875 30,624,516 107,944,875 468,054 40,423,938 468,054 40,891,992 0 4,722,759 4,722,759 40,891,992 0 0
Streetscene 7,891,828 4,423,461 7,891,828 0 2,147,915 (188,166) 1,959,749 0 743,321 743,321 1,959,749 0 0
Transport 4,757,454 1,973,635 4,757,454 0 4,494,466 0 4,494,466 0 1,710,646 1,710,646 4,494,466 0 0
Waste Services 14,539,343 14,539,343 14,539,343 0 0 0 0 0 0 0 0 0 0
Renewable Energy 15,307,181 1,948,354 15,307,181 0 7,727,424 0 7,727,424 0 79,745 79,745 7,727,424 0 0
Office Accommodation 1,600,920 348,738 1,600,920 0 1,600,920 (68,314) 1,532,606 0 348,738 348,738 1,532,606 0 0
Other Property 6,519,441 621,040 6,519,441 0 4,989,531 0 4,989,531 0 124,151 124,151 4,753,194 (236,337) (236,337)
Other Housing 470,000 0 470,000 0 381,025 0 381,025 0 (88,975) (88,975) 381,025 0 0
Economic Development & Regeneration 169,372,636 29,150,413 169,372,636 0 47,209,402 (1,874,104) 45,335,298 0 1,018,773 1,018,773 45,335,298 0 0
Completed Projects 6,355,261 6,275,623 6,355,261 0 40,595 0 40,595 0 (36,958) (36,958) 40,595 0 0
SUB TOTAL 334,758,940 89,905,123 334,758,940 468,054 109,015,216 (1,662,530) 107,352,686 0 8,622,201 8,622,201 107,116,349 (236,337) (236,337)
Other
Other 10,103,666 0 8,873,616 (1,230,050) 3,354,666 (1,230,050) 2,124,616 0 0 0 2,124,616 0 0
SUB TOTAL 10,103,666 0 8,873,616 (1,230,050) 3,354,666 (1,230,050) 2,124,616 0 0 0 2,124,616 0 0
Uncertainty / Sensitivity Adjustment* (27,512,826) (27,512,826) (27,512,826)
Total Project Expenditure 580,646,058 203,608,144 579,416,008 (761,996) 134,272,965 (27,020,804) 107,252,161 0 12,581,731 12,581,731 107,015,824 (236,337) (236,337)
Total Project Income (134,272,965) 27,020,804 (107,252,161) (16,762,960) (16,762,960) 0 (107,015,824) 236,337 236,337
Total Net Expenditure 0 0 0 (16,762,960) (4,181,229) 12,581,731 0 0 0
* Sensitivity adjustment of 10% or 25% based on source and reliability of expenditure projections
On Target (+0.5% of budget) On Target (up to  5% delay of original timescales)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less) Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less) Significantly off target (+10% or more of original timescales)
The following classifications have been used to highlight financial performance against
budget
CURRENT YEAR 2023/24
North Ayrshire Council Capital Statement 2023/24
Year Ended 31st March 2024
Period 3
The following classifications have been used to highlight delivery performance
against original timescales set
81

Page 82

Revised Budget
23/24 Variance
£ £ £ £ £ £ £ £ £
CAPITAL BORROWING
Prudential Borrowing 68,291,931 5,814,577 2,683,086 76,789,594 1,874,755 78,664,349 79,707,239 1,042,890
SUB TOTAL 68,291,931 5,814,577 2,683,086 76,789,594 1,874,755 0 78,664,349 0 79,707,239 1,042,890
SCOTTISH GOVERNMENT FUNDING
Specific Capital Grants
Early Learning & Childcare 0 26,594 59,206 85,800 0 85,800 85,801 85,800 0
Cycling / Walking /Safer Streets 1,159,954 (117,150) 271,000 1,313,804 30,000 1,343,804 0 1,343,804 0
Vacant & Derelict Land Funding 3,857,216 403,874 198,048 4,459,138 0 4,459,138 2,953,137 4,459,138 0
UK Government Grant - AGD 3,653,000 (98,741) 3,554,259 0 3,554,259 0 2,339,000 (1,215,259)
Town Centre Regeneration 0 65,691 140,000 205,691 0 205,691 205,690 205,691 0
Annickbank - Vacant & Derelict Land Investment Programme 400,000 400,000 0 400,000 400,000 400,000 0
Millport Town Hall Regeneration 0 (31,995) 252,529 220,534 0 220,534 220,534 220,534 0
Millport Town Hall Phase 2 94,022 339,498 433,520 0 433,520 433,520 433,520 0
Ardrossan Promenade 788,000 788,000 0 788,000 763,000 788,000 0
Islands Pit Stops 20,000 520,000 540,000 0 540,000 540,000 540,000 0
Islands Cost Crisis Emergency Fund 17,000 17,000 0 17,000 17,000 17,000 0
Place Based Investment Programme 0 622,801 948,836 1,571,637 761,000 2,332,637 1,571,637 2,332,637 0
UK Shared Prosperity Fund 98,414 98,414 202,330 300,744 98,414 300,744 0
Island Infrastructure Fund 0 140,373 140,373 0 140,373 140,374 140,373 0
B714 Improvements 500,000 322,741 822,741 0 822,741 322,741 1,250,795 428,054
Road Safety Improvement Fund 215,647 215,647 0 215,647 0
Renewal of Play Parks 231,000 231,000 (231,000) 0 0 0 0
2-4 Boyle Street Hostel 31,025 31,025 0 31,025 0 31,025 0
CO2 Monitors in Schools 0 0 76,651 76,651 76,651 76,651 0
Capital Grants
Flooding 20,525,000 20,525,000 0 20,525,000 0 20,525,000 0
General Capital Grant 15,179,000 15,179,000 (1,368,000) 13,811,000 8,495,250 13,811,000 0
SUB TOTAL 45,105,170 1,896,235 3,615,531 50,616,936 (313,372) 0 50,303,564 16,323,750 49,516,359 (787,205)
OTHER INCOME TO PROGRAMME
Use of Funds :-
Capital Fund 0 0 0 0 0 0 0 0 0 0
Change & Service Redesign Fund 0 0 0 0 0 0 0 0 0 0
CFCR 0 0 0 0 300,000 0 300,000 300,000 300,000 0
Grants & Contributions 2,068,411 632,323 301,603 3,002,337 1,530,000 0 4,532,337 132,050 4,532,337 0
Capital Receipts 465,555 0 0 465,555 7,160 0 472,715 7,160 472,715 0
SUB TOTAL 2,533,966 632,323 301,603 3,467,892 1,837,160 0 5,305,052 439,210 5,305,052 0
TOTAL CAPITAL PROGRAMME FUNDING 115,931,067 8,343,135 6,600,220 130,874,422 3,398,543 0 134,272,965 16,762,960 134,528,650 255,685
23/24 Budget at
Capital Refresh
Mar 2023
Capital Programme Funding 2023/24
Projected Income
to 31st March
2024
Approved budget
at Period 1 used
as revised starting
point 2023/24
Actual Income to 30
June 2023Funding Description
Carry Forward
from 2022/23
Changes after
Capital Refresh Mar
2023
Total Changes in
Year
Changes at Capital
Refresh Mar 2024
82

Page 83

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date Budget
2023/24
Actual Expenditure to
30 June 2023
Year to date Variance
2023/24
Projected
Expenditure to 31
March 2024
Actual Over/ (Under)
Spend for 2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £ £ £ £
Nursery Education
Early Years Programme
EARLY LEARNING & CHILDCARE FUTURE PROJECTS 4,307 4,073 4,307 0 234 0 0 0 234 0 0 Future Projects Future Projects Future Projects Complete Complete
ST BRIDGETS EARLY YEARS 787,477 787,477 787,477 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
KILMORY EARLY YEARS 55,978 28,187 55,978 0 27,791 0 0 0 27,791 0 0 31-Aug-24 31-Aug-24 Pre Tender On Target On Target
ST PETERS EARLY YEARS 1,261,310 1,248,429 1,261,310 0 17,583 0 4,703 4,703 17,583 0 0 31-Aug-23 31-Aug-23 Construction On Target On Target
ST JOHN OGILVIE EARLY YEARS 177,415 177,415 177,415 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
MAYFIELD PS EARLY YEARS 215,710 215,710 215,710 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
BEITH PS EARLY YEARS 339,763 341,180 339,763 0 0 0 1,417 1,417 0 0 0 Complete Complete Complete Complete Complete
SKELMORLIE PS EARLY YEARS 358,835 358,835 358,835 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
WEST KILBRIDE EARLY EARLY YEARS 232,807 221,228 232,807 0 7,752 0 (3,827) (3,827) 7,752 0 0 31-May-23 31-May-23 Construction On Target On Target
GATESIDE EARLY YEARS 407,764 407,764 407,764 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
GARNOCK CAMPUS EARLY YEARS 58,755 58,755 58,755 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
FAIRLIE EARLY YEARS 205,120 205,120 205,120 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ELDERBANK EARLY YEARS 22,983 22,983 22,983 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
DREGHORN EARLY YEARS 82,940 82,940 82,940 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CUMBRAE EARLY YEARS 40,184 40,195 40,184 0 0 0 12 12 0 0 0 Complete Complete Complete Complete Complete
LARGS CAMPUS EARLY YEARS 45,836 45,836 45,836 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
MOORPARK EARLY YEARS 182 182 182 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PIRNMILL EARLY YEARS 80,000 71,911 80,000 0 8,154 0 65 65 8,154 0 0 28-Feb-24 28-Feb-24 Construction On Target On Target
SHISKINE EARLY YEARS 127,013 127,013 127,013 0 0 0 0 0 0 0 0 28-Feb-24 28-Feb-24 Construction On Target On Target
CORRIE EARLY YEARS 38,605 28,442 38,605 0 10,163 0 0 0 10,163 0 0 01-Aug-23 01-Aug-23 Defects On Target On Target
LAMLASH EARLY YEARS 15,000 877 15,000 0 14,123 0 0 0 14,123 0 0 31-Aug-24 31-Aug-24 Tender On Target On Target
BRODICK EARLY YEARS 354,659 354,659 354,659 0 0 0 0 0 0 0 0 31-Aug-23 31-Aug-23 Construction On Target On Target
MARRESS HOUSE 4,010,310 3,654,793 4,010,310 0 450,000 0 94,483 94,483 450,000 0 0 22-Jul-22 Construction On Target Slightly off target  Delays anticipated
Completed Nursery Education
GLENCAIRN / LOUDON MONTGOMERY EARLY YEARS 170,429 170,429 170,429 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ARDEER EARLY YEARS 216,819 216,819 216,819 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ST JOHNS EARLY YEARS 283,930 283,930 283,930 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
STANLEY EARLY YEARS 27,514 27,514 27,514 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
KILWINNING (PENNYBURN SCHOOL) EARLY YEARS 648,135 648,135 648,135 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
DALRY EARLY YEARS CENTRE 56,920 56,920 56,920 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
SPRINGVALE EARLY YEARS 104,557 104,557 104,557 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ABBEY / ST LUKES PRIMARY SCHOOL EARLY YEARS 64,615 64,615 64,615 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ST LUKES EARLY YEARS 1,966 1,966 1,966 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CASTLEPARK EARLY YEARS 219,376 219,376 219,376 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
LAWTHORN EARLY YEARS 201,037 201,037 201,037 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
HAYOCKS EARLY YEARS 246,765 246,765 246,765 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
WOODLANDS EARLY YEARS 181,546 181,546 181,546 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CORSEHILL EARLY YEARS 536,144 536,144 536,144 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CALEDONIA EARLY YEARS 255,432 255,432 255,432 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
BLACKLANDS EARLY YEARS 204,144 204,144 204,144 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
WINTON EARLY YEARS 5,290 5,290 5,290 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
SPRINGSIDE EARLY YEARS 566,752 566,752 566,752 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ST MARKS EARLY YEARS 350,497 350,497 350,497 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
Other Nursery Education
ANNICK PRIMARY EXT - EARLY YRS PROVISION 3,103,416 3,070,354 3,103,416 0 33,062 0 0 0 33,062 0 0 01-Jun-23 01-Jun-23 Construction On Target On Target
Total Nursery Education 16,368,237 15,896,227 16,368,237 0 568,862 0 96,852 96,852 568,862 0 0 0
CAPITAL MONITORING 2023/24
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2023/24 BUDGETS
83

Page 84

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date Budget
2023/24
Actual Expenditure to
30 June 2023
Year to date Variance
2023/24
Projected
Expenditure to 31
March 2024
Actual Over/ (Under)
Spend for 2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
CAPITAL MONITORING 2023/24
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2023/24 BUDGETS
Primary Schools
MOORPARK PRIMARY 10,849,441 7,643,802 10,849,441 0 4,312,892 0 1,107,253 1,107,253 5,542,942 1,230,050 1,230,050 30-Sep-24 30-Sep-24 Construction On Target On Target
MONTGOMERIE PARK SCHOOL 23,448,999 2,992,086 23,448,999 0 6,939,048 0 1,896,088 1,896,088 9,243,600 2,304,552 2,304,552 01-Aug-25 01-Aug-25 Tender On Target On Target
UNIVERSAL FREE SCHOOL MEALS EXPANSION 3,211,546 0 3,211,546 0 252,174 0 0 0 252,174 0 0 31-Mar-24 31-Mar-24 Tender On Target On Target
UFSM ARDEER PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM BEITH PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM BRODICK PRIMARY SCHOOL 144,178 121,450 144,178 0 22,844 0 117 117 22,844 0 0 31-Aug-23 31-Aug-23 Construction On Target On Target
UFSM CORRIE PRIMARY SCHOOL 52,795 52,795 52,795 0 0 0 0 0 0 0 0 31-Aug-23 31-Aug-23 Construction On Target On Target
UFSM CORSEHILL PRIMARY SCHOOL 60,000 0 60,000 0 60,000 0 0 0 60,000 0 0 31-Aug-25 31-Aug-25 Tender On Target On Target
UFSM GARNOCK COMMUNITY CAMPUS 90,000 0 90,000 0 90,000 0 0 0 90,000 0 0 31-Aug-25 31-Aug-25 Tender On Target On Target
UFSM GLEBE PRIMARY SCHOOL 2,043,869 0 2,043,869 0 0 0 0 0 0 0 0 31-Aug-29 31-Aug-29 Tender On Target On Target
UFSM GLENCAIRN PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM HAYOCKS PRIMARY SCHOOL 82,500 0 82,500 0 82,500 0 0 0 82,500 0 0 31-Aug-25 31-Aug-25 Development On Target On Target
UFSM KILMORY PRIMARY SCHOOL 60,000 0 60,000 0 60,000 0 0 0 60,000 0 0 31-Aug-24 31-Aug-24 Tender On Target On Target
UFSM LARGS PRIMARY SCHOOL 148,533 148,533 148,533 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
UFSM LOUDOUN-MONTGOMERY PRIMARY SCHOOL 2,081,077 0 2,081,077 0 0 0 0 0 0 0 0 31-Aug-28 31-Aug-28 Tender On Target On Target
UFSM PENNYBURN PRIMARY SCHOOL 22,500 0 22,500 0 22,500 0 0 0 22,500 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM SHISKINE PRIMARY SCHOOL 15,000 6,072 15,000 0 8,928 0 0 0 8,928 0 0 31-Aug-23 31-Aug-23 Construction On Target On Target
UFSM WEST KILBRIDE PRIMARY SCHOOL 2,252,504 201,931 2,252,504 0 34,308 0 (4,441) (4,441) 34,308 0 0 31-Aug-27 31-Aug-27 On Site On Target On Target
UFSM WHITING BAY PRIMARY SCHOOL 25,000 0 25,000 0 25,000 0 0 0 25,000 0 0 31-Aug-24 31-Aug-24 Tender On Target On Target
Total Primary Education 44,655,442 11,166,669 44,655,442 0 11,977,694 0 2,999,016 2,999,016 15,512,296 3,534,602 0 3,534,602 
Secondary Schools
KILWINNING LEARNING ENVIRONMENT 2,805,435 2,428,004 2,805,435 0 378,401 0 970 970 378,401 0 0 31-Mar-25 31-Mar-25 Construction On Target On Target
AYRSHIRE COLLEGE PARTNERSHIP DEVELOPMENT 0 0 0 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
ARDROSSAN NEW BUILD 80,205,307 1,761,000 80,205,307 0 4,693,884 0 271,359 271,359 4,693,884 0 0 31-Aug-26 31-Aug-26 In Development On Target On Target
Total Secondary Education 83,010,742 4,189,004 83,010,742 0 5,072,285 0 272,329 272,329 5,072,285 0 0 0
Special Education
LOCKHART CAMPUS 25,343,637 25,239,710 25,343,637 0 138,595 0 34,668 34,668 138,595 0 0 Complete Complete Snagging Complete Complete
Total Special Education 25,343,637 25,239,710 25,343,637 0 138,595 0 34,668 34,668 138,595 0 0 0
Schools Other
CO2 MONITORS IN SCHOOLS 298,000 151,457 298,000 0 146,543 0 0 0 146,543 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SCHOOLS ICT INVESTMENT * 582,194 242,182 582,194 0 582,194 0 242,182 242,182 582,194 0 0 31-Mar-24 31-Mar-24 On-going On Target On Target
Total Schools Other 880,194 393,639 880,194 0 728,737 0 242,182 242,182 728,737 0 0 0
Information & Culture
CASTLES & HISTORIC MONUMENTS 38,303 0 38,303 0 38,303 0 0 0 38,303 0 0 Holding Code Holding Code Holding Code Holding Code Holding Code
ABBEY TOWER 75,176 6,563 75,176 0 68,613 0 0 0 68,613 0 0 31-Mar-25 31-Mar-25 Planning On Hold On Hold
Total Information & Cultural 113,479 6,563 113,479 0 106,916 0 0 0 106,916 0 0 0
Completed Projects
GARNOCK CAMPUS 40,307,259 40,283,664 40,307,259 0 2,893 0 (20,702) (20,702) 2,893 0 0 Complete Complete Complete Complete Complete
AUCHENHARVIE SECONDARY ESTATE LEARNING ENVT 3,112,120 3,111,334 3,112,120 0 786 0 0 0 786 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 43,419,379 43,394,998 43,419,379 0 3,679 0 (20,702) (20,702) 3,679 0 0 0
Total Communities 213,791,110 100,286,809 213,791,110 0 18,596,768 0 3,624,345 3,624,345 22,131,370 3,534,602 0 3,534,602
84

Page 85

CHIEF EXECUTIVE
MILESTONE
Total Project Budget                   
Cumulative
Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 30
June 2023
Year to date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project
Stage
Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £ £ £ £
Council IT Strategy
ICT INVESTMENT FUND 4,075,490 957,838 4,075,490 0 543,757 0 48,105 48,105 543,757 0 0 31-Mar-26 31-Mar-26 On-going On Target On Target
WAN 902,197 402,197 902,197 0 0 0 0 0 0 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
LAN/WiFi 2,673,000 1,060,026 2,673,000 0 228,838 0 115,865 115,865 228,838 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
TELEPHONY 1,146,693 232,042 1,146,693 0 269,050 0 4,399 4,399 119,050 (150,000) (150,000) 31-Mar-28 31-Mar-28 Implementation On Target On Target
Total IT Strategy 8,797,380 2,652,103 8,797,380 0 1,041,645 0 168,369 168,369 891,645 (150,000) 0 (150,000)
Total Chief Executive 8,797,380 2,652,103 8,797,380 0 1,041,645 0 168,369 168,369 891,645 (150,000) 0 (150,000)   
CAPITAL MONITORING 2023/24
CommentsProject Description
COMPLETION DATESTOTAL PROJECT DELIVERY STATUS2023/24 BUDGETS
85

Page 86

HEALTH & SOCIAL CARE
MILESTONE
Total Project
Budget                   
Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date Budget
2023/24
Actual Expenditure to
30 June 2023
Year to date Variance
2023/24
Projected Expenditure
to 31 March 2024
Actual Over/
(Under) Spend for
2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £ £ £ £
Management & Support
HOME CARE SYSTEM 433,917 433,917 433,917 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
COMMUNITY ALARMS - ANALOGUE TO DIGITAL 996,000 4,190 996,000 0 658,810 0 0 0 658,810 0 0 31-Dec-23 31-Dec-23 Future Years On Target On Target
CAREFIRST IT SYSTEM 84,620 84,620 84,620 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CAREFIRST REPLACEMENT 536,058 267,993 536,058 0 268,065 0 0 0 268,065 0 0 31-Aug-24 31-Aug-24 In development On Target On Target
47 WEST ROAD 300,000 0 300,000 0 300,000 0 0 0 300,000 0 0 21-Jun-24 21-Jun-24 Refurbishment On Target On Target
Total Management & Support 2,350,596 790,721 2,350,596 0 1,226,875 0 0 0 1,226,875 0 0 0
Housing Non HRA
IMPROVEMENT GRANTS * 656,571 159,758 656,571 0 656,571 0 159,758 159,758 656,571 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target 
Total Housing Non HRA 656,571 159,758 656,571 0 656,571 0 159,758 159,758 656,571 0 0 0
Adults
TRINDLEMOSS 4,608,078 4,590,097 4,608,078 0 18,047 0 66 66 18,047 0 0 Complete Complete Complete Complete Complete
Total Older People 4,608,078 4,590,097 4,608,078 0 18,047 0 66 66 18,047 0 0 0
Young People
RESIDENTIAL & RESPITE UNIT 5,579,718 5,223,534 5,579,718 0 363,177 0 6,993 6,993 363,177 0 0 Complete Complete Snagging Complete Complete
Total Young People 5,579,718 5,223,534 5,579,718 0 363,177 0 6,993 6,993 363,177 0 0 0
Total Health & Social Care 13,194,962 10,764,109 13,194,962 0 2,264,670 0 166,817 166,817 2,264,670 0 0 0
CAPITAL MONITORING 2023/24
2023/24 BUDGETSTOTAL PROJECT COMPLETION DATES
CommentsProject Description
DELIVERY STATUS
86

Page 87

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 30
June 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £ £ £ £
Roads
ROADS IMPROVE/RECONSTRUCTION * 4,447,261 4,447,261 4,447,261 0 4,447,261 0 266,574 266,574 4,447,261 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
ROAD SAFETY IMPROVEMENT FUND 215,647 215,647 215,647 0 215,647 0 0 0 215,647 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
A737 DALRY BYPASS 375,735 375,735 375,735 0 375,735 0 0 0 375,735 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
TRAFFIC CALMING 175,000 92,047 175,000 0 82,953 0 0 0 82,953 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
LIGHTING * 1,417,342 63,348 1,417,342 0 1,417,342 0 63,348 63,348 1,417,342 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
LED LIGHTING REPLACEMENT 694,999 79,132 694,999 0 154,169 0 79,132 79,132 154,169 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
A737 DALRY BYPASS LIGHTING 20,685 0 20,685 0 16,611 0 0 0 16,611 0 0 31-Mar-24 31-Mar-24 Preparing Works PackagesOn Target On Target
UPPER GARNOCK FPS 18,503,800 17,558,640 18,503,800 0 1,067,828 0 122,667 122,667 1,067,828 0 0 Complete Complete Complete Complete Complete
MILLPORT COASTAL FPS 48,599,797 5,401,766 48,599,797 0 26,724,382 0 3,561,351 3,561,351 26,724,382 0 0 31-Aug-24 31-Aug-24 Construction On Target On Target
MILLBURN FPS 1,757,000 253,471 1,757,000 0 393,547 0 0 0 393,547 0 0 31-Jul-24 31-Jul-24 Design On Target On Target
MILLPORT PIER 500,000 150,080 500,000 0 0 0 0 0 40,000 40,000 40,000 31-Mar-25 31-Mar-25 In Development On Target On Target
BRIDGES INFRASTRUCTURE PROG * 899,430 194,854 899,430 0 899,430 0 194,854 194,854 899,430 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
LARGS PROMENADE SEAWALL 3,969,000 337,674 3,969,000 0 3,635,046 0 3,719 3,719 3,635,046 0 0 30-Apr-24 30-Apr-24 Construction On Target On Target
B714 UPGRADE 26,063,443 1,319,710 26,063,443 0 822,741 0 430,452 430,452 1,250,795 428,054 428,054 28-Feb-26 28-Feb-26 Outline Design On Target On Target
LARGS CAR PARK INFRASTRUCTURE 55,128 55,128 55,128 0 661 0 661 661 661 0 0 Complete Complete Complete Complete Complete
PARKING CHARGES & DPE 250,610 80,025 250,610 0 170,585 0 0 0 170,585 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
Total Roads 107,944,875 30,624,516 107,944,875 0 40,423,938 0 4,722,759 4,722,759 40,891,992 468,054 0 468,054
Streetscene
CEMETERY EXTNS, WALLS & INFRA * 526,939 0 526,939 0 (111,834) 0 0 0 0 111,834 111,834 Holding Code Holding Code Holding Code Holding Code Holding Code
CMTY, LAMLASH - EXTENSION 715,065 715,065 715,065 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CMTY, ARDROSSAN - PLOTS/WALLS 217,922 152,479 217,922 0 61,864 0 (3,578) (3,578) 61,864 0 0 Complete Complete Complete Complete Complete
CMTY, KILBIRNIE - WORKS 25,383 25,383 25,383 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CMTY, KILWINNING - NEW 1,402,589 1,363,542 1,402,589 0 138,061 0 99,014 99,014 138,061 0 0 31-May-23 31-May-23 Construction On Target On Target
CMTY, KNADGERHILL - EXTENSION 416,471 414,810 416,471 0 1,661 0 0 0 1,661 0 0 Complete Complete Complete Complete Complete
CMTY, WEST KILBRIDE - WORKS 398,033 361,141 398,033 0 36,892 0 0 0 36,892 0 0 28-Feb-24 28-Feb-24 Construction On Target On Target
CMTY, STEV HIGH ROAD - WORKS 506,878 491,694 506,878 0 137,408 0 122,223 122,223 137,408 0 0 30-Apr-23 30-Apr-23 Construction On Target On Target
ARDROSSAN CEMETERY NEW 603 603 603 0 0 0 0 0 0 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, BRODICK - NEW 12,000 8,317 12,000 0 4,979 0 1,296 1,296 4,979 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, KILBIRNIE - WALLS 188,370 15,626 188,370 0 172,744 0 0 0 172,744 0 0 31-Mar-25 31-Mar-25 Feasibility Works On Target On Target
CMTY, BEITH - WALLS 87,542 14,635 87,542 0 72,907 0 0 0 72,907 0 0 31-Mar-25 31-Mar-25 Feasibility Works On Target On Target
CMTY, ABBEY TOWER - WALLS 95,550 6,052 95,550 0 89,498 0 0 0 89,498 0 0 31-Aug-25 31-Aug-25 Feasibility Works On Target On Target
CMTY, STEV HAWKHILL - WALLS 108,732 5,860 108,732 0 102,872 0 0 0 102,872 0 0 31-Aug-25 31-Aug-25 Feasibility Works On Target On Target
CMTY, WEST KILBRIDE - WALLS 99,528 4,604 99,528 0 94,924 0 0 0 94,924 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, MILLPORT - WALLS 2,846 2,846 2,846 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, ARDROSSAN - WALLS 4,338 4,338 4,338 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, IRVINE OP CHURCH - WALLS 2,775 2,775 2,775 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, DREGHORN - WALLS 3,260 3,260 3,260 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, KILBIRNIE BARONY - WALLS 1,828 1,828 1,828 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, LAMLASH - WALLS 3,627 3,627 3,627 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, STEV HIGH KIRK - WORKS 22,754 22,754 22,754 0 0 0 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, KILBIRNIE - NEW 600,514 11,287 600,514 0 389,227 0 0 0 389,227 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, DALRY - WALLS 2,450 2,450 2,450 0 0 0 0 0 0 0 0 On Target On Target
CMTY, ARDROSSAN - EXTENSION 900,000 0 900,000 0 600,000 0 0 0 300,000 (300,000) (300,000) 31-Mar-25 31-Mar-25 Planning On Target On Target
COASTAL PLAY PARKS 0 255,071 0 0 0 0 255,071 255,071 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
STREET FURNITURE IMPROVEMENT 69,469 87,123 69,469 0 0 0 17,654 17,654 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PARK ENABLING WORKS 85,363 111,102 85,363 0 0 0 25,740 25,740 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
RENEWAL OF PLAY PARKS 1,391,000 335,189 1,391,000 0 356,712 0 225,901 225,901 356,712 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
Total Streetscene 7,891,828 4,423,461 7,891,828 0 2,147,915 0 743,321 743,321 1,959,749 (188,166) 0 (188,166)
Transport
VEHICLES * 2,130,744 1,709,616 2,130,744 0 2,130,744 0 1,709,616 1,709,616 2,130,744 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target
WORKPLACE CHARGERS 318,261 226,433 318,261 0 92,858 0 1,030 1,030 92,858 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target
FLEET DECARBONISATION 2,308,449 37,585 2,308,449 0 2,270,864 0 0 0 2,270,864 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target
Total Transport 4,757,454 1,973,635 4,757,454 0 4,494,466 0 1,710,646 1,710,646 4,494,466 0 0 0
Waste Services
SHEWALTON LANDFILL 13,272,542 13,272,542 13,272,542 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
WASTE COLLECTION REVIEW 1,266,801 1,266,801 1,266,801 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
Total Waste Services 14,539,343 14,539,343 14,539,343 0 0 0 0 0 0 0 0 0
CAPITAL MONITORING 2023/24
Project Description
TOTAL PROJECT 2023/24 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
87

Page 88

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 30
June 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
CAPITAL MONITORING 2023/24
Project Description
TOTAL PROJECT 2023/24 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
Renewable Energy
SOLAR PV RETROFIT EXTENSION 120,000 42,014 120,000 0 77,986 0 0 0 77,986 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SOLAR PV INVESTMENT - NETHERMAINS 7,289,441 211,694 7,289,441 0 6,622,319 0 66,013 66,013 6,622,319 0 0 30-Apr-24 30-Apr-24 Work Ongoing On Target On Target
SOLAR PV INVESTMENT - SHEWALTON 5,540,347 148,669 5,540,347 0 252,530 0 50,558 50,558 252,530 0 0 30-Oct-24 30-Oct-24 Work Ongoing On Target On Target
NON DOMESTIC ENERGY EFFICIENCY PROGRAMME 1,000,000 899,585 1,000,000 0 63,589 0 (36,827) (36,827) 63,589 0 0 31-Mar-24 31-Mar-24 Work Ongoing On Target On Target
NATURE RESTORATION FUND 711,000 0 711,000 0 711,000 0 0 0 711,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
ELECTRIC VEHICLES INFRASTRUCTURE 646,392 646,392 646,392 0 0 0 0 0 0 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
Total Renewable Energy 15,307,181 1,948,354 15,307,181 0 7,727,424 0 79,745 79,745 7,727,424 0 0 0
Office Accommodation
PROPERTY LIFECYCLE INVESTMENT * 133,604 419 133,604 0 133,604 0 419 419 133,604 0 0 0 31-Mar-24 31-Mar-24 Mulitple projects On Target On Target
PLI BEITH CEMETERY 69 69 69 0 69 0 69 69 69 0 0 Complete Complete Complete Complete Complete
PLI TOWNEND CC 7,949 7,949 7,949 0 7,949 0 7,949 7,949 7,949 0 0 Complete Complete Complete Complete Complete
PLI PORTLAND PLACE 27,967 17,267 27,967 0 27,967 0 17,267 17,267 27,967 0 0 0 30-Nov-23 30-Nov-23 Planning On Target On Target
PLI WEST BYREHILL DEPOT 106,204 106,204 106,204 0 106,204 0 106,204 106,204 106,204 0 0 0 Complete Complete Complete Complete Complete
PLI GOLDCRAIGS DEPOT 114,767 4,878 114,767 0 114,767 0 4,878 4,878 114,767 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI BEITH PRIMARY SCHOOL 2,300 1,957 2,300 0 2,300 0 1,957 1,957 2,300 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI BLACKLANDS PRIMARY SCHOOL 0 (4,080) 0 0 0 0 (4,080) (4,080) 0 0 0 Complete Complete Complete Complete Complete
PLI CASTLEPARK PRIMARY SCHOOL 83,915 0 83,915 0 83,915 0 0 0 83,915 0 0 18-Aug-23 18-Aug-23 Planning On Target On Target
PLI CUMBRAE PRIMARY 3,867 3,867 3,867 0 3,867 0 3,867 3,867 3,867 0 0 Complete Complete Complete Complete Complete
PLI DALRY PRIMARY SCHOOL 68,314 0 68,314 0 68,314 0 0 0 0 (68,314) (68,314) 18-Aug-24 18-Aug-24 Planning On Target On Target
PLI DREGHORN PRIMARY SCHOOL 71,453 2,633 71,453 0 71,453 0 2,633 2,633 71,453 0 0 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI PENNYBURN PRIMARY 178,419 520 178,419 0 178,419 0 520 520 178,419 0 0 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI PIRNMILL PRIMARY 0 6,142 0 0 0 0 6,142 6,142 0 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI SKELMORLIE PRIMARY SCHOOL 73,980 2,178 73,980 0 73,980 0 2,178 2,178 73,980 0 0 30-Nov-23 30-Nov-23 Planning On Target On Target
PLI ST BRIDGETS PRIMARY 855 124 855 0 855 0 124 124 855 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI ST JOHN OGILVIE PRIMARY SCHOOL 6,744 6,744 6,744 0 6,744 0 6,744 6,744 6,744 0 0 Complete Complete Complete Complete Complete
PLI AUCHENHARVIE ACADEMY* 374,081 173,833 374,081 0 374,081 0 173,833 173,833 374,081 0 0 31-Dec-23 31-Dec-23 Construction On Target On Target
PLI IRVINE ROYAL ACADEMY* 12,000 12,000 12,000 0 12,000 0 12,000 12,000 12,000 0 0 Complete Complete Complete Complete Complete
PLI KILWINNING ACADEMY 188,421 1,014 188,421 0 188,421 0 1,014 1,014 188,421 0 0 31-Oct-23 31-Oct-23 Planning On Target On Target
PLI KYLE ROAD UNIT 34 4,067 0 4,067 0 4,067 0 0 0 4,067 0 0 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI ACHNAMARA CHILDREN'S UNIT 9,000 0 9,000 0 9,000 0 0 0 9,000 0 0 31-Aug-23 31-Aug-23 Planning On Target On Target
PLI ANAM CARA 28,333 5,020 28,333 0 28,333 0 5,020 5,020 28,333 0 0 31-Oct-23 31-Oct-23 Planning On Target On Target
PLI EGLINTON CASTLE 48,000 0 48,000 0 48,000 0 0 0 48,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
PLI THE PORTAL 56,611 0 56,611 0 56,611 0 0 0 56,611 0 0 Complete Complete Complete Complete Complete
Total Office Accommodation 1,600,920 348,738 1,600,920 0 1,600,920 0 348,738 348,738 1,532,606 (68,314) 0 (68,314)
Other Property
INDUSTRIAL PORTFOLIO * 430,713 0 430,713 0 430,713 0 0 0 430,713 0 0 On Hold On Hold On Hold On Hold On Hold
HOME 4,470,198 289,898 4,470,198 0 3,148,529 0 1,250 1,250 3,148,529 0 0 0 On Hold On Hold On Hold On Hold On Hold
BUILD 284,086 47,749 284,086 0 237,837 0 1,500 1,500 1,500 (236,337) (236,337) 0 On Hold On Hold On Hold On Hold On Hold
EMERGENCY CONTROL CTR 158,000 66,220 158,000 0 156,780 0 65,000 65,000 156,780 0 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
GOLDCRAIGS REFURBISHMENT 766,000 25,000 766,000 0 741,000 0 0 0 741,000 0 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
GALLOWGATE TOILETS 275,803 87,983 275,803 0 246,153 0 58,333 58,333 246,153 0 0 31-Jul-23 31-Jul-23 Planning On Target On Target
WOODLANDS PRIMARY PLAYINGFIELD DRAINAGE 134,641 104,190 134,641 0 28,519 0 (1,932) (1,932) 28,519 0 0 Complete Complete Complete Complete Complete
Total Property 6,519,441 621,040 6,519,441 0 4,989,531 0 124,151 124,151 4,753,194 (236,337) (236,337) 0
Other Housing
CCTV REVIEW 350,000 0 350,000 0 350,000 0 0 0 350,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
2-4 BOYLE STREET HOSTEL 120,000 0 120,000 0 31,025 0 (88,975) (88,975) 31,025 0 0 12-May-23 12-May-23 Construction On Target On Target
Total Other Housing 470,000 0 470,000 0 381,025 0 (88,975) (88,975) 381,025 0 0 0
Regeneration
TOWN CENTRE REGENERATION 1,201,659 1,002,714 1,201,659 0 205,691 0 6,745 6,745 205,691 0 0 30-Sep-23 30-Sep-23 Construction On Target On Target
REPURPOSING PROPERTY GRANT FUND 348,665 23,845 348,665 0 347,985 0 23,165 23,165 347,985 0 0 30-May-25 30-May-25 In development On Target On Target
STEVENSTON BEACH HUB 95,475 95,475 95,475 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
MILLPORT TOWN HALL REGENERATION 754,026 712,814 754,026 0 220,534 0 179,322 179,322 220,534 0 0 31-May-23 31-May-23 Construction On Target On Target
MILLPORT TOWN HALL PHASE 2 433,520 61,696 433,520 0 433,520 0 61,696 61,696 433,520 0 0 31-May-23 31-May-23 Construction On Target On Target
ISLANDS PIT STOPS 540,000 0 540,000 0 540,000 0 0 0 540,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
ISLAND INFRASTRUCTURE FUND 259,000 118,626 259,000 0 140,374 0 0 0 140,374 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
ISLANDS COST CRISIS FUND 17,000 0 17,000 0 17,000 0 0 0 17,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
PLACE BASED INVESTMENT PROGRAMME (PBIP) 1,041,035 279,275 1,041,035 0 1,010,258 0 248,498 248,498 1,010,258 0 0 31-Mar-26 31-Mar-26 In development On Target On Target
UK SHARED PROSPERITY FUND (SPF) 300,744 0 300,744 0 300,744 0 0 0 300,744 0 0 31-Mar-25 31-Mar-25 In development On Target On Target
PBIP 36 BANK STREET 169,999 89,528 169,999 0 86,827 0 6,356 6,356 86,827 0 0 31-Dec-25 31-Dec-25 In development On Target On Target
PBIP GALT HOUSE 50,000 0 50,000 0 50,000 0 0 0 50,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
IRVINE HIGH STREET 2,837,316 2,720,001 2,837,316 0 115,961 0 (1,353) (1,353) 115,961 0 0 Complete Complete Complete Complete Complete
DOCKHEAD STREET SALTCOATS 100,000 0 100,000 0 100,000 0 0 0 100,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
MILLPORT CARS 11,943 0 11,943 0 11,943 0 0 0 11,943 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
MONTGOMERIE PARK MASTERPLAN 4,218,597 1,775,944 4,218,597 0 353,665 0 1,012 1,012 353,665 0 0 31-Mar-30 31-Mar-30 In development On Target On Target
88

Page 89

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Year to Date
Budget 2023/24
Actual
Expenditure to 30
June 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
CAPITAL MONITORING 2023/24
Project Description
TOTAL PROJECT 2023/24 BUDGETS COMPLETION DATES DELIVERY STATUS
Comments
LOCHSHORE, KILBIRNIE 2,061,138 1,771,188 2,061,138 0 419,358 0 129,409 129,409 419,358 0 0 31-May-25 31-May-25 In development On Target On Target
LOCHSHORE GARNOCK HUB 4,195,999 4,023,247 4,195,999 0 112,229 0 (60,524) (60,524) 112,229 0 0 Complete Complete Complete Complete Complete
VDLF - IRVINE KYLE ROAD SITE PREP* 1,421,110 1,421,110 1,421,110 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
VDLF - KYLE ROAD PHASE 2 1,798,066 143,495 1,798,066 0 1,657,226 0 2,655 2,655 1,657,226 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
VDLF - ANNICKBANK PH 3* 1,981,000 228,066 1,981,000 0 1,904,739 0 151,805 151,805 1,904,739 0 0 31-Mar-24 31-Mar-24 Tender On Target On Target
VDLF - DEVELOPMENT WORK* 422,479 114,955 422,479 0 329,012 0 21,488 21,488 329,012 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
VDLF - MAIN ST KILBIRNIE* 53,000 53,000 53,000 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
VDLF - DALRY RD SALTCOATS* 2,905 2,905 2,905 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
VDLF - STRATEGY 28,555 0 28,555 0 28,555 0 0 0 28,555 0 0 30-Sep-23 30-Sep-23 In development On Target On Target
VDLF - TREE PLANTING 50,000 2,400 50,000 0 47,600 0 0 0 47,600 0 0 31-Dec-23 31-Dec-23 In development On Target On Target
VDLF - MINOR IMPROVEMENTS 10,000 10,000 10,000 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
MONTGOMERIE PARK NEIGHBOURHOOD CTR 175,000 0 175,000 0 175,000 0 0 0 175,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
VDLF STALLED SPACES FUND 125,000 0 125,000 0 125,000 0 0 0 125,000 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
QUARRY ROAD PHASE 2 5,209,497 5,204,719 5,209,497 0 4,778 0 0 0 4,778 0 0 Complete Complete Complete Complete Complete
VDLF - GAS WORKS (DALRY)* 173,896 173,896 173,896 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
CYCLING/WALKING/SAFER STREETS * 1,311,610 819,545 1,311,610 0 1,311,610 0 26,449 26,449 1,311,610 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
ACCESS PATH NETWORK PROGRAMME * 669,667 669,667 669,667 0 669,667 0 1,262 1,262 669,667 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
FAIRLIE COASTAL PATH 500,000 500,000 500,000 0 500,000 0 0 0 500,000 0 0 31-Dec-23 31-Dec-23 In development On Target On Target
IRVINE CYCLE FRIENDLY TOWN 50,000 466,198 50,000 0 50,000 0 0 0 50,000 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
BRODICK TO CORRIE CYCLE PATH 80,000 60,199 80,000 0 80,000 0 0 0 80,000 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
ARDROSSAN PROMENADE 788,000 0 788,000 0 788,000 0 0 0 788,000 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
BUS CORRIDOR IMPROVEMENTS 289,041 189,041 289,041 0 100,000 0 0 0 100,000 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
CUMBRAE FERRY & BUS STOP 489,547 140,253 489,547 0 350,000 0 706 706 350,000 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
B714 ACTIVE TRAVEL IMPROVEMENTS 500,000 100,000 500,000 0 400,000 0 0 0 400,000 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
B777 CORRIDOR IMPROVEMENTS 38,400 10,592 38,400 0 33,600 0 5,792 5,792 33,600 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SALTCOATS OLD CAL RAILWAY PH1 268,588 55,075 268,588 0 213,513 0 0 0 213,513 0 0 26-Jun-23 26-Jun-23 Planning On Target On Target
SALTCOATS OLD CAL RAILWAY PH2 31,888 0 31,888 0 31,888 0 0 0 31,888 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
Total Regeneration 35,103,365 23,039,468 35,103,365 0 13,266,277 0 804,481 804,481 13,266,277 0 0 0
Ayrshire Growth Deal
AGD - I3 DPMC PHASE 1 1,000,000 5,449 1,000,000 0 600,000 0 0 0 400,000 (200,000) (200,000) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 DPMC PHASE 2 4,999,999 248,651 4,999,999 0 210,554 0 9,235 9,235 200,000 (10,554) (10,554) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 1 15,617,569 610,750 15,617,569 0 3,671,828 0 65,327 65,327 2,339,000 (1,332,828) (1,332,828) 31-Oct-24 31-Oct-24 Multiple Projects On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 2 100,000 0 100,000 0 100,000 0 0 0 100,000 0 0 31-Mar-28 31-Mar-28 Multiple Projects On Target On Target
AGD - HUNTERSTON - CENTRE OF LOW CARBON ENERGY & CIRCULAR 18,040,001 234,562 18,040,001 0 353,892 0 2,335 2,335 200,000 (153,892) (153,892) 31-Mar-30 31-Mar-30 Multiple Projects On Target On Target
AGD - GREAT HARBOUR 14,187,576 635,194 14,187,576 0 646,013 0 37,105 37,105 503,000 (143,013) (143,013) 31-Mar-28 31-Mar-28 Multiple Projects On Target On Target
AGD - IMSE 10,500,000 137,404 10,500,000 0 142,747 0 3,891 3,891 100,000 (42,747) (42,747) 31-Mar-30 31-Mar-30 Design On Target On Target
AGD - MARINE TOURISM ARDROSSAN 7,500,000 335,474 7,500,000 0 463,683 0 778 778 450,000 (13,683) (13,683) 31-Mar-26 31-Mar-26 Design On Target On Target
AGD - MARINE TOURISM ARRAN 2,025,577 66,203 2,025,577 0 40,482 0 5,719 5,719 30,000 (10,482) (10,482) 31-Mar-29 31-Mar-29 Design On Target On Target
AGD - MARINE TOURISM CUMBRAE 2,025,577 75,870 2,025,577 0 60,648 0 7,691 7,691 50,000 (10,648) (10,648) 31-Mar-29 31-Mar-29 Design On Target On Target
Total Ayrshire Growth Deal 75,996,300 2,349,558 75,996,300 0 6,289,847 0 132,082 132,082 4,372,000 (1,917,847) 0 (1,917,847)
Growth & Investment
ARDROSSAN HARBOUR INTERCHANGE 4,127,112 472,478 4,127,112 0 84,257 0 17,026 17,026 128,000 43,743 43,743 1st Qtr 2026 1st Qtr 2026 Design On Target On Target
IRVINE ENTERPRISE AREA 10,746,072 0 10,746,072 0 0 0 0 0 0 0 0 Ongoing Ongoing Multiple Projects On Target On Target
LOW CARBON HUB 1,430,017 112,005 1,430,017 0 1,318,012 0 0 0 1,318,012 0 0 30-Sep-24 30-Sep-24 Multiple Projects On Target On Target
ARDROSSAN NORTH SHORE 41,532,859 2,898,951 41,532,859 0 26,092,051 0 65,185 65,185 26,092,051 0 0 27-May-24 27-May-24 Tender On Target On Target
VDLF - HARBOUR MASTERS OFFICE 157,500 20,933 157,500 0 136,567 0 0 0 136,567 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
VDLF - I3 IRVINE ENTERPRISE 279,411 257,020 279,411 0 22,391 0 0 0 22,391 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
Other Growth & Investment 58,272,971 3,761,387 58,272,971 0 27,653,278 0 82,211 82,211 27,697,021 43,743 0 43,743
Total Economic Development & Regeneration 169,372,636 29,150,413 169,372,636 0 47,209,402 0 1,018,773 1,018,773 45,335,298 (1,874,104) 0 (1,874,104)
Completed Projects
BIOMASS RETROFIT PROGRAMME 3,378,163 3,377,163 3,378,163 0 0 0 (1,000) (1,000) 0 0 0 Complete Complete Complete Complete Complete
QUARRY ROAD PHASE 1 2,977,098 2,898,460 2,977,098 0 40,595 0 (38,043) (38,043) 40,595 0 0 Complete Complete Defects Period Complete Complete
ARDROSSAN HOSTEL 0 0 2,086 2,086 0 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 6,355,261 6,275,623 6,355,261 0 40,595 0 (36,958) (36,958) 40,595 0 0 0
Total Place 334,758,940 89,905,123 334,758,940 0 109,015,216 0 8,622,201 8,622,201 107,116,349 (1,898,867) (236,337) (1,662,530)
89

Page 90

OTHER BUDGETS
AE
Total Project Budget                    Cumulative Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Year to Date Budget
2023/24
Actual Expenditure
to 30 June 2023
Year to Date
Variance 2023/24
Projected
Expenditure to 31
March 2024
Over/ (Under)
Spend for 23/24
£ £ £ £ £ £ £ £ £ £
FLEXIBILITY / IMPROVEMENT FUND 10,103,666 0 8,873,616 (1,230,050) 3,003,666 0 0 0 1,773,616 (1,230,050)
CORE INFRASTRUCTURE INVESTMENT 351,000 0 351,000 0 351,000 0 0 0 351,000 0
Total Other Budgets 10,103,666 0 8,873,616 (1,230,050) 3,354,666 0 0 0 2,124,616 (1,230,050)
2023/24 BUDGETS
CommentsProject Description
TOTAL PROJECT
90

Page 91

APPENDIX 2
TOTAL PROJECT
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Actual Expenditure to
31 June 2023
Projected Expenditure
to 31st March 2024 Virement Request
Carry /Brought
Forward to /From
2024/25
True Over/
(Under) Spend
Delivery Status
Financial
Delivery Status
Physical Narrative
£ £ £ £ £ £ £ £ £
EXPENDITURE
Council House Building
Afton Court 1,335,654 1,088,468 1,335,654 0 681,987 434,801 681,987 0 0 On Target On Target Project on-site, due to complete July 2023.
Ayrshire Central Site 50,373,322 2,611,059 50,373,322 0 35,270,992 52,408 600,000 (34,670,992) On Target Significantly off
target
Project due to commence on site February 2024.  Project start date delayed to allow an
energy options appraisal to be carried out to inform the heating strategy for the site. 
Following confirmation of the strategy, further design work was required for the site and
internal layouts of the properties.  Due to the size of the development a second public
consultation event was also required.
Bourtreehill Village 9,924,743 65,865 9,924,743 0 3,944,138 0 50,000 (3,894,138) On Target Significantly off
target
First draft plans consultation event took place 28 June 2023.  Due to commence on-site
October 2024.
Brathwic Terrace 6,674,074 6,522,518 6,674,074 0 26,403 (91,173) 151,556 125,153 On Target Complete Complete - reported underspend in 22/23 offset by overspend in 23/24
Caley Court 3,131,066 2,808,436 3,131,066 0 322,630 1,863 322,630 0 On Target Complete Complete
Corsehillhead 2,027,810 212,599 2,027,810 0 1,815,211 0 350,000 (1,465,211) On Target Significantly off
target
Project due to commence on site November 2023.
Dalrymple Place 5,838,627 5,820,488 5,838,627 (0) 1,473 (82,125) 18,139 16,666 On Target Complete Complete - reported underspend in 22/23 offset by overspend in 23/24
Flatt Road 19,934,544 19,620,843 19,934,544 0 302,327 (11,374) 302,327 0 On Target Complete Complete
Friars Lawn 2,199,628 1,968,980 2,199,628 0 230,648 0 231,468 820 On Target Complete Complete
Fullarton Street (High Flats) 14,481,290 25,935 14,481,290 0 7,436,946 0 100,000 (7,336,946) On Target Significantly off
target
Demolition project completion deferred to November 2023.  New build project due to
commence on site July 2024.
Garnock Academy Site 12,092,889 602,453 12,092,889 0 11,093,276 7,468 3,500,000 (7,593,276) On Target Significantly off
target
Project due to commence on site October 2023. Project start date delayed by one year to
allow an energy options appraisal to be carried out to inform the heating strategy for the
site. Additional design work was required following this decision. Tender due to be
returned July 2023. 
Garrier Court 2,335,551 2,382,239 2,382,239 46,688 0 (0) 0 0 On Target Complete Complete
Glebe Place 1,894,952 0 1,894,952 0 1,659,897 0 0 (1,659,897) On Target On Target Project deferred to 2026/27 following refurbishment of the block for Ukraines funded by
the Scottish Government.
Harbourside 14,622,742 14,068,220 14,622,742 0 854,503 299,981 939,356 84,853 On Target Complete Complete
James McFarlane Site 4,784,118 376,551 4,784,118 0 4,407,567 0 500,000 (3,907,567) On Target Significantly off
target
Project due to commence on site November 2023.
James Reid Site 11,896,026 862,603 11,896,026 0 11,033,423 0 2,000,000 (9,033,423) On Target Significantly off
target
Project due to commence on site November 2023. Project start date delayed by one year to
allow an energy options appraisal to be carried out to inform the heating strategy for the
site.  Additional design work was required following this decision.
Kings Arms (113-115 High Street) 2,169,980 307,149 2,169,980 0 1,863,106 275 932,000 (931,106) On Target Significantly off
target
Project due to commence on site September 2023.
Laburnum Ave/Newhouse Dr (Regen 1a&b) 3,274,506 95 3,274,506 0 3,274,411 0 400,000 (2,874,411) On Target Significantly off
target
Project due to commence on site January 2024.
Largs Police Station 2,769,301 2,111,027 2,769,301 0 1,038,675 380,401 1,038,673 (2) On Target On Target Project on-site due to complete August 2023
Montgomerie Park (Both Phases) 46,166,866 4,679,142 46,166,866 0 27,666,119 0 1,500,000 (26,166,119) On Target Significantly off
target
Project due to commence on site February 2024.  Project start date delayed to allow an
energy options appraisal to be carried out to inform the heating strategy for the site. 
Following confirmation of the strategy, further design work was required for the site and
internal layouts of the properties.  Due to the size of the development a second public
consultation event was also required.
Regeneration Project 1d 9,965,851 2,750 9,965,851 0 4,779,553 0 0 (4,779,553) On Target Significantly off
target
Pre Site
Regeneration Project 1e 1,658,083 0 1,658,083 0 1,097,853 0 0 (1,097,853) On Target Significantly off
target
Project due to commence on site June 2024.
Springvale  2,852,016 2,743,995 2,852,016 0 0 (2,000) 108,021 108,021 On Target Complete Complete - reported underspend in 22/23 offset by overspend in 23/24
Stanecastle Site 7,768,147 604,509 7,768,147 0 6,843,473 0 750,000 (6,093,473) On Target Significantly off
target
Project due to commence on site November 2023. Project start date delayed by one year to
allow an energy options appraisal to be carried out to inform the heating strategy for the
site. Additional design work was required following this decision.
St Beya Gardens 3,691,052 3,689,346 3,691,052 0 0 0 1,706 1,706 On Target Complete Complete 
St Colm's Largs 4,907,987 4,808,504 4,907,987 0 0 (65,376) 12,685 12,685 On Target Complete Complete 
St Michael's Wynd 13,996,769 14,097,801 13,996,769 (0) 0 (188,682) (101,032) 0 (101,032) On Target Complete Complete  - in year credit expected from Scottish Water.
Towerlands Primary School 8,579,943 8,461,992 8,579,943 0 3,673 (108,673) 9,279 5,606 On Target Complete Complete
Unallocated Regeneration Block 8,304,876 0 8,304,876 0 478,702 0 479,000 298 On Target On Target
Nelson Street Regeneration 622,116 0 622,116 0
622,116
0 50,000 (572,116) On Target Significantly off
target
Pre Site
Acquisition Of Land & Buildin 0 (292) 0 0 0 (292) 0 0 On Target On Target
House Building - General 1,547,765 0 1,547,765 0 1,547,765 0 1,547,765 0 On Target On Target
Acquisition Houses-Open Market 587,980 38,666 254,752 (333,228) 587,980 38,666 254,752 (333,228) 0 On Target On Target
Dickson Drive Phase 2 0 0 0 0 0 0 0 0 On Target On Target
Harbour Street 0 0 0 0 0 0 0 0 On Target On Target
Refurb - Connell Court 0 (30,395) 0 0 0 (30,395) 0 0 On Target On Target Complete
Kinnear Road 2,118 0 2,118 0 2,118 0 2,118 0 On Target Complete Complete
Contingency 11,000,624 0 11,000,624 0 11,000,624 0 11,000,624 0 On Target On Target
Internal Management Charges 1,757,259 235,101 1,757,259 0 1,757,259 235,101 1,757,259 0 On Target On Target
SUB TOTAL 293,413,016 100,551,545 293,126,475 (286,541) 141,644,848 870,875 29,490,313 (333,228) (111,970,115) 148,808
HRA Capital Statement 2324
Period 2
CURRENT YEAR 2023/24 DELIVERY STATUS
91

Page 92

APPENDIX 2
TOTAL PROJECT
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Actual Expenditure to
31 June 2023
Projected Expenditure
to 31st March 2024 Virement Request
Carry /Brought
Forward to /From
2024/25
True Over/
(Under) Spend
Delivery Status
Financial
Delivery Status
Physical Narrative
£ £ £ £ £ £ £ £ £
HRA Capital Statement 2324
Period 2
CURRENT YEAR 2023/24 DELIVERY STATUS
Improvements to existing stock
Bathrooms 426,386 0 426,386 0 426,386 0 426,386 0 On Target On Target
Bathrooms - Void 770,876 46,561 770,876 0 770,876 46,561 770,876 0 On Target On Target
Wet Room - Planned 150,025 0 150,025 0 150,025 0 150,025 0 On Target On Target
Wet Room - Void 341,561 7,211 341,561 0 341,561 7,211 341,561 0 On Target On Target
Electrical Rewiring 969,075 43,665 969,075 0
969,075
43,665 741,075 (228,000) On Target On Target Anticipated slippage of 76 units due to no access.  Tender for new contract due in
September.
Heating 2,924,745 249,347 2,372,885 (551,860)
2,924,745
249,347 2,372,885 0 (551,860) On Target On Target Additional 32 units completed but scope of works reduced resulting in an anticipated
underspend.  Tender for new contract due in September.
Kitchens 2,646,010 40,005 2,526,347 (119,663) 2,646,010 40,005 1,581,530 (119,663) (944,817) On Target On Target Carry forward from 22/23 to be re-profiled to future years.
Kitchens - Void 1,085,091 101,528 1,204,754 119,663 1,085,091 101,528 1,204,754 119,663 0 On Target On Target
Roofing 878,404 25,661 1,105,661 227,257 878,404 25,661 1,105,661 227,257 0 On Target On Target
Wallfloor rendering 1,006,924 454,216 1,090,726 83,802
1,006,924
454,216 1,090,726 83,802 0 On Target On Target Projected overspend of £84k to be met from underspend in Smoke Detection programme
EWI 2,321,052 0 2,369,236 48,184
2,321,052
2,369,236 48,184 0 Projected overspend of £48k to be met from underspend in Smoke Detection programme
Window Replacement 541,903 54,368 541,903 0 541,903 54,368 541,903 0 On Target On Target
Saltcoats MSF Investment 947,986 204,795 1,281,214 333,228 947,986 204,795 1,281,214 333,228 0 On Target On Target Projected expenditure includes buy-back houses, budget virement requested.
Smoke Detector Programme 1,467,917 70,817 1,070,902 (397,015)
1,467,917
70,817 250,000 (397,015) (820,902) On Target On Target Carry forward of £821k to be reprofiled over future years. £397k of underspend vired to
meet in year pressures in other budget lines.
Energy Efficiency 1,846,610 0 1,552,610 (294,000)
1,846,610
0 1,552,610 (294,000) 0 On Target On Target Budget virement of £294k to support sustainability works within sheltered housing units.
Solar Panels 5,012,228 0 5,050,000 37,772
5,012,228
0 5,050,000 37,772 0 On Target On Target Current projected overspend of £38k to be met from underspend in Smoke Detection
programme.
SUB TOTAL 23,336,793 1,298,174 22,824,161 (512,632) 23,336,793 1,298,174 20,830,442 39,228 (1,993,719) (551,860)
Other Capital works
Estate Based Regeneration 2,093,064 (103,733) 2,093,064 0 2,093,064 (103,733) 2,093,064 0 On Target On Target
Lift Replacement 454,425 0 454,425 0 454,425 0 100,000 (354,425) On Target On Target Slippage on programme . Works now expected to commence Dec/Jan
Sheltered Housing Units 12,407,531 19,482 12,701,531 294,000
12,407,531
19,482 4,146,664 294,000 (8,554,867) On Target On Target Significant slippage on a multi year sheltered housing project.  A reprofiling exercise over
the medium term is to be carried out.
High Flats Demolition 2,368,970 247,100 2,368,970 0 2,368,970 247,100 2,368,970 0 On Target On Target Completion anticipated November 2023
Health and Safety Works 207,000 0 0 (207,000) 207,000 0 0 0 (207,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Parkhall & Kirkhall Asbestos 17,358 0 0 (17,358) 17,358 0 0 0 (17,358) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Major Improvements 6,000 0 0 (6,000) 6,000 0 0 0 (6,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Newhouse Drive (Regen 1b) 5,000 0 0 (5,000) 5,000 0 0 0 (5,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Maress House Refurb (12,540) 0 (12,540) 0 (12,540) 0 (12,540) 0 On Target On Target
SUB TOTAL 17,546,808 162,849 17,605,450 58,642 17,546,808 162,849 8,696,158 294,000 (8,909,292) (235,358)
Total Expenditure 310,959,824 100,714,393 310,731,925 (227,899) 182,528,449 2,331,898 59,016,913 0 (122,873,126) (638,410)
Income
Affordable Housing Contributn (2,444,930) (2,444,930)
CFCR (5,151,045) (5,151,045)
Capital Grants (44,979,389) (14,993,130) 29,986,259
Prudential Borrowing (125,888,418) (32,363,141) 92,886,867 638,410
Council HB fund contribution (4,064,667) (4,064,667)
SUB TOTAL (182,528,449) 0 (59,016,913) 122,873,126 638,410
Total Project Expenditure 310,959,824 100,714,393 310,731,925 (227,899) 182,528,449 2,331,898 59,016,913 (122,873,126) (638,410)
Total Project Income (182,528,449) 0 (59,016,913) 122,873,126 638,410
Total Net Expenditure 0 2,331,898 0 0 0
On Target (+0.5% of budget) On Target (up to  5% delay of original timescales)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less) Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less) Significantly off target (+10% or more of original timescales)
The following classifications have been used to highlight financial performance against
budget
92

Page 93

Appendix 3
Treasury Management Performance to 30 June 2023    
Capital Expenditure for both the General Fund and HRA vary from original estimates due to changes
in the profile of projects. Full details of all movements in the capital expenditure budgets are
included in this report.  
The reduction to the Capital Financing Requirement reflects the change in profile of the capital
programme. 
Capital expenditure impacts on the revenue budget through financing charges so it is essential the
Council ensures the financing costs remain affordable and do not constitute an excessive proportion
of the revenue resources available.   From a General Fund perspective, the latest Scottish Local
Authority average was 5.5%, thereby demonstrating a prudent borrowing policy.   For the HRA, the
Scottish average was 22.7%. The level of loan charges is deemed prudent and affordable within the
framework of the 30 year Housing business plan.  
2023/24 2023/24 2023/24
Original Estimate P3 Projection Movement
£m £m £m
General Services Capital expenditure                   115.931                    107.016                       (8.915)
Funded by:
Borrowing                     68.292                      52.195                     (16.097)
Receipts / Grants                     47.639                      54.521                         6.882
Funded from Revenue                              -                            0.300                         0.300
Funded from Reserves                              -                                  -                                  -   
Total                   115.931                    107.016                       (8.915)
HRA Capital expenditure                   172.316                      59.017                  (113.299)
Funded by:
Borrowing                   115.676                      32.363                     (83.313)
Receipts / Grants                     44.979                      14.993                     (29.986)
Funded from Revenue                        5.151                         5.151                               -   
Funded from Reserves                        6.510                         6.510                               -   
Total                   172.316                      59.017                  (113.299)
Estimates of Capital Expenditure and Income
2023/24 2023/24 2023/24
Original Estimate P3 Projection Movement
£m £m £m
General Services                   355.611                    358.275                         2.664
HRA                   284.275                    190.569                     (93.706)
Sub-total                   639.886                    548.844                     (91.042)
Less PPP/NPD long-term liability                    (87.732)                    (87.732)                              -   
Loans Capital Financing Requirement (CFR)                   552.154                    461.112                     (91.042)
Capital Financing Requirement (CFR)
2023/24 2023/24
Original Estimate P3 Projection
% %
General Services 3.4% 2.8%
HRA 27.8% 21.4%
Proportion of financing costs to net revenue
stream
93

Page 94

The Council is currently under-borrowed by £89.000m due to the continuing strategy to delay long-
term external borrowing by utilising internal cash balances.
Liability Benchmark
The liability benchmark is an important tool to help establish whether the Council is likely to be a
long-term borrower or long-term investor in the future, and so shape its strategic focus and decision
making. 
The Liability benchmark graph above is used to inform the Council’s borrowing strategy.  The shaded
grey area shows the Councils current debt and the gap between this and the Liability benchmark line
is how much more borrowing the Council likely needs to undertake to support its current capital
plans once taking into account its balance sheet resources including the net debtor / creditor and
useable reserves.  The above graph indicates that long term borrowing for the period of around 20
years would be most appropriate to meet the Councils borrowing needs and mitigate against interest
rate risk.
2023/24 2023/24 2023/24
Original Estimate P3 Projection Movement
£m £m £m
Gross Debt at 31 March                   490.154                    372.112                  (118.042)
CFR                   552.154                    461.112                     (91.042)
(Under)/Over Borrowed Position                    (62.000)                    (89.000)                    (27.000)
Current Portfolio Position (excluding PPP/NPD)
0
200
400
600
800
1,000
2023 2027 2031 2035 2039 2043 2047 2051 2055 2059 2063 2067 2071
£m Liability Benchmark - North Ayrshire
Fixed rate loans LOBO loans
2023/24 2023/24 2023/24
Original
Estimate
£m
P3 Projection
£m
Movement
£m
Loans CFR                   552.154                    461.112                     (91.042)
Less Balance sheet resources                    (78.200)                 (155.300)                    (77.100)
Net loans requirement                   473.954                    305.812                  (168.142)
Liquidity allowance                     10.000                      10.000                               -   
Liability Benchmark                   483.954                    315.812                  (168.142)
Liability Benchmark
94

Page 95

The maturity structure of the debt portfolio at 30 June 2023 is shown below and shows the period
when the Council is required to repay and/or refinance debt. It is important to ensure a reasonable
spread of debt to mitigate against high exposure levels in respect of refinancing.  The current profile
ensures this: 
The overall reduction in debt is a result of maturing debt which has not currently required to be
replaced to slippage in the capital programme and the use of interna funds in line with the Council’s
strategy.
31-Mar-23 31-Jun-23
Maturity Profile of Borrowing (Indicator 10) Actual Actual Movement
£m £m £m
Under 12 months                      43.481                      41.949                       (1.532)
12 months and within 24 months                        2.950                         2.950                               -   
24 months and within 5 years                        6.207                         9.907                         3.700
5 years and within 10 years                     21.639                      24.439                         2.800
10 years and within 20 years                     33.177                      26.177                       (7.000)
20 years and within 30 years                        6.225                         6.225                               -   
30 years and within 40 years                   106.887                    106.887                               -   
40 years and within 50 years                     15.000                      15.000                               -   
50 years and above                     10.000                      10.000                               -   
Total Borrowing                   245.566                    243.534                       (2.032)
95

Page 96

96

Page 97

NORTH AYRSHIRE COUNCIL 
29 August 2023 
Cabinet
Title: Health and Safety Annual Report 2022/23
Purpose: To provide Cabinet with an update report on the Health and
Safety performance within Council Services during 2022/23.
Recommendation: That the Cabinet notes the Annual Health & Safety Performance
update for 2022/23 and the statistics covering a 3-year period. 
1. Executive Summary 
1.1 Health and Safety cuts across every Service within the Council. North Ayrshire
Council has a legal duty of care to protect the health, safety and welfare of its
employees and others who are affected by its business. Corporate Health and Safety
operates in partnership with all Services and external partners to provide advice,
guidance and support to improve the health and safety culture and reduce the risk of
injury and ill-health incidents. 
1.2 The Corporate Health and Safety team issues and keeps under review a range of
guidance documents to reflect organisational change and new updated working
practices. 
1.3 With reference to the Corporate Health & Safety Annual Report at Appendix 1,
information is provided which illustrates the incident trends within the Council. The
report includes important information regarding the three years of statistics; and
recognising that 2020/21 is a stand-alone year due to the COVID 19 pandemic and
should not be used for meaningful trend analysis. 
1.4 The Corporate Health and Safety team has been particularly active during 2022/23 in
supporting Council Services to return to normal working following the effects of the
COVID 19 pandemic. 
2. Background 
2.1 The Health and Safety at Work Act places a Duty of Care on employers towards
employees while they are at work. To meet its Duty of Care, it is essential that the
Council works pro-actively to provide safe systems of work risk assessments and
training, as well as monitoring health and safety performance. 
2.2 The Corporate Health and Safety Annual Report, which is attached at Appendix 1 to
this report, is a key part of the monitoring and reporting process to Senior
Management and Elected Members.
Agenda Item 8
97

Page 98

2.3 The Annual Report outlines in detail the following: 
• Developments during 2022/23
• Corporate Health and Safety Training
• Incident Statistics and monitoring
• Planned Improvements for 2023/24. 
Developments 
2.4 Much of the focus of the team during 2022/23 related to supporting Council Services
to return to normal working following the COVID pandemic. 
2.5 There was a continued focus on working from home during the pandemic and then the
subsequent return to work and engaging in the new hybrid way of working. This
initially posed challenges regarding first aid cover and fire warden cover due to the
possibility of employees who cover these roles working from home and not in the
office, however solutions were put in place to address those issues. 
2.6 The Corporate Health, Safety and Wellbeing Policy communicates the Council’s
commitment, direction and priority of protecting employees' health, safety and
wellbeing within the workplace. The policy was updated in January 2023 and the
Policy Statement of Intent was approved by the Chief Executive. 
2.7 The Council has an on-going Duty of Care regarding elected members, and the
Personal Safety for Elected Members Guidance was updated in April 2022 and issued
out to all members. 
Training 
2.6 The suspension of face to face training due to the COVID pandemic continued into
2022, however, from January 2023 we have gradually re-introduced face to face
training commencing with Risk Assessment. It is planned to introduce the IOSH
courses at the beginning of 2023/24. 
Incident Monitoring 
2.7 Monitoring the Council’s performance of health and safety requires statistics to be
analysed to identify appropriate actions. The monitoring is undertaken by Elected
Members, Chief Officers, Senior Management and Trade Unions. 
2.8 To support effective Health and Safety monitoring, each Directorate holds a Health
and Safety Planning Group meeting, normally chaired by a Chief Officer on a quarterly
basis. The purpose of these meetings is to review, discuss and plan operational
Health and Safety Performance, actions and improvements. 
2.9 Furthermore, on a quarterly basis, the Corporate Health and Safety team reports on
directorate performance statistics, health and safety projects and performance to the
Corporate Health and Safety Group chaired by the Leader of the Council and attended
by senior health and safety representatives from all Services and Trade Unions. 
2.10 Section 4 of the annual report provides a detailed statistical review across a three-year
period, however, 2020/21 should not be used for meaningful comparison or trend
analysis as the Covid-19 pandemic had an effect on the health and safety
98

Page 99

performance for that particular year. The data shows that there has been a total of
1567 incidents for this year which is up by 59 compared to last year. 
2.11 With regard to the more serious incidents which are reported under the RIDDOR
(Reporting of Incidents and Dangerous Occurrences Regulations), there were 25
incidents this year compared to 25 incidents last year. 
2.12 The type of incident returning the highest numbers is aggression and violence within
education settings. The number of recorded incidents of aggression and violence in
ASN schools was proportionally higher than in other education settings. A very high
percentage of these were identified as “without intent.” This was in line with
expectations within the new reporting mechanisms and relates to specific additional
support needs, including medical conditions. 
2.13 A working group, including trade unions and corporate health and safety, is being set
up to look at ways of reducing the incidence of aggression and violence incidents, with
a relationship-based approach as the focus for improvement.  The working group will
consider report into the Corporate Health & Safety Group on a quarterly basis. 
Planned Improvements 
2.14 Plans are in place to deliver further improvements to the Health and Safety framework
during 2023/24 – these include: 
• Implement the new Evotix Assure Incident Reporting System
• Develop guidance for the new Evotix Assure System
• Review and cascade new or amended Health and Safety Policies/Guidance
• Procure supplier for Lone Working Devices
• Procure new COSHH Assessment System; and
• Increase delivery of health and safety training for all Services. 
3. Proposals 
3.1 It is proposed that the Cabinet notes the Annual Health & Safety report for 2022/23
and the statistics covering a 3-year period. Also, that Cabinet notes in 2020/21,
COVID 19 was still having an effect on Council Services and this was reflected in
health & safety data. 
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 Supporting health, safety and wellbeing for Council employees, customers and service
users.
99

Page 100

Legal 
4.3 Ensuring that the Council meets its Duty of Care and complies with Health and Safety
legislation. Failure to do so may result in prosecutions or financial penalties. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 A robust Health and Safety culture supports the delivery of the key priorities in the
Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The Corporate Health and Safety Team consults regularly on Health and Safety with
Elected Members, employees and Trade Unions. The subject matter within this report
has been shared at directorate planning groups and at the Corporate Health and
Safety group. 
Mark Boyd
Head of Service (Finance) 
For further information please contact James Walls, Team Manager (Health & Safety), on
07920845048. 
Background Papers
None.
100

Page 101

CORPORATE HEALTH AND SAFETY 
ANNUAL REPORT 2022/23
&
3 Year Statistical Comparison
(2020/21 – 2021/22 – 2022/23) 
Version:  1.0
Date: August 2023
Author: James Walls
Classification: Public 
101

Page 102

10/08/2023 Page 2 of 14 [PUBLIC] 
CORPORATE HEALTH AND SAFETY
ANNUAL REPORT 2022/2023 
1 Background
1.1 The Health and Safety at Work Act places significant requirements on employers to
ensure a Duty of Care to employees while at work. To meet its Duty of Care, it is
essential that the Council provides safe systems of work, carries out risk
assessments and monitors health and safety performance in relation to its services,
employees and service users. Monitoring the Council’s performance of health and
safety requires statistics to be gathered and analysed, to identify appropriate action.
The monitoring is undertaken by Elected Members, Chief Officers, Senior
Management, Employees and Trade Unions.
1.2 To support effective Health and Safety monitoring, each directorate holds a Health
and Safety Planning Group meeting, normally chaired by a Chief Officer on a
quarterly basis. The purpose of these meetings is to review, discuss and plan
operational Health and Safety performance, actions and incident statistics.
1.3 On a quarterly basis, the Corporate Health and Safety team reports on combined
directorate statistics, health and safety projects and performance to the Corporate
Health and Safety Group chaired by the Leader of the Council and attended by
senior health and safety representatives from all Council Services and also Trade
Unions.
1.4 The Corporate Health and Safety Team comprises four Health and Safety Advisers,
and the Health and Safety Manager, who provide professional advice, guidance and
support to Council Services, including the Health and Social Care Partnership.
1.5 The Corporate Health and Safety Team continues to promote the theme of “Safety
in Mind”. The overarching aim of this theme is to raise the profile and
understanding of Health and Safety in the workplace and to keep health and safety
at the forefront of all our employees' minds on a day-to-day basis. 
2 Developments during 2022/23
2.1 The sections below include the areas where the Corporate Health and Safety Team
has supported all Services. 
Reviews of Policies and Guidance
2.2 To ensure all Employees have access to current health and safety information and
advice, all policies and guides have been published on the Council Intranet Site
Connects.
2.3 The Corporate Health, Safety and Wellbeing Policy communicates the Council’s
commitment, direction and priority of protecting employees' health, safety and
wellbeing within the workplace. The policy provides clarity and definition of
workplace responsibilities at each level within the Council and was developed in
partnership with Chief Officers, Employees and Trade Unions. The policy was
updated in January 2023 and the Policy Statement of Intent was signed by the Chief
Executive.
102

Page 103

10/08/2023 Page 3 of 14 [PUBLIC] 
2.4 The following documents have been Developed/Updated since the last Cabinet
report:
• Corporate Health, Safety & Wellbeing Policy
• Infection Guidance
• Personal Safety Elected Members Guidance
• New & Expectant Mothers
• Corporate Health & Safety Group Meeting Guidance
2.5 The following documents have been under review and will be updated in 2023/24: 
• Fire Guidance
• CRID (Corporate Risk Indicator Database) Guidance
• 6 Monthly Inspection Guidance
• 6 Monthly Inspection Form
• Lone Working Guidance
• New Health & Safety Reporting System Guidance. 
Health and Safety Audits
2.6 Corporate Health & Safety along with the Service Support Officer for H&SCP have
carried out a number of visits to premises, with a total of 17 being audited on Fire
Management and First Aid Management. Premises responsible managers were
very appreciative of the help and advice given. 
HSE Visits
2.7 In 2022/23 we received one visit from the Health & Safety Executive which was
carried out at the Bartonholm Waste Transfer Site in January 2023. The inspector
issued NAC with 3 Prohibition Notices and an action plan was developed to
implement corrective measures. The actions have all been completed. 
3 Corporate Health and Safety Training
3.1 During 2020/21 and 2021/22 all face-to-face training was suspended due to the
COVID-19 lockdown.
3.2 The Corporate Health and Safety Team recognised that additional training was
required especially regarding risk assessment. Towards the middle of the pandemic
we started on the development of a virtual risk assessment course which was
available in May 2021. This continued through 2022 and it is only at the end of
2022/23 where we have re-introduced face to face training which commenced with
Risk Assessment Training.
3.3 The plan going forward for 2023/24 is to get the IOSH Managing Safely Course
back up and running and then bring the rest of the corporate courses into play as
well.
103

Page 104

10/08/2023 Page 4 of 14 [PUBLIC] 
4 Incident Statistics
4.1 A key part of the Corporate Health and Safety Team’s monitoring role is to collect
and review statistics on all reported Health and Safety incidents and near misses. 
Please Note: When analysing the statistics in the following sections within the
report, please note that 2020/21 cannot be used for meaningful comparison or trend
analysis as the Covid-19 pandemic had an effect on the health and safety
performance for that particular year. 
All Health and Safety Incidents
4.2 Graph 1 below provides an analysis of incidents over a 36-month period and shows
a comparison of all incidents from 1st April 2020 to 31st March 2023. Please Note:
2020/21 was heavily influenced by the COVID 19 Virus and this is reflected in the
total number of incidents in the year. This means that as stated in section 4.1 above,
2020/21 cannot be included when doing a trend analysis, only the last 2 years
should be used to compare health & safety performance. 
Graph 1 
4.3 Graph 1 shows a split between the RIDDOR Reportable incidents and the non-
Reportable incidents. If we add both together, in 2020/21 we had a total of 798
incidents, 1508 incidents in 2021/22, and 1567 incidents in 2022/23. The total
number of RIDDOR incidents reportable to the HSE are shown above in Graph 1,
however, further detailed analysis is provided in the paragraphs below. 
RIDDOR Incidents by Directorate 
4.4 The Council has a legal duty to report certain incidents to the Health and Safety
Executive as per the requirements of the Reporting of Injuries Diseases and
Dangerous Occurrences Regulations (RIDDOR). Graph 2 below shows a
comparison of RIDDOR reportable incidents across all Directorates over the last 3
years. 
4.5 Graph 2 below shows that over the 3-year period, the Place Directorate has
reported the highest number of RIDDOR incidents with a total of 34, followed by
Communities & Education with 26 and then Health and Social Care Partnership with
21. It should be noted that the H&SCP are showing a distinctive trend downwards
over the last 3 years.
All Incidents RIDDOR Reportable
and Non-Reportable
2000
1483 1542
1500
1000 767
500 31 25 25
0
Non-Reportable Reportable
2020-21 2021-22 2022-23
104

Page 105

10/08/2023 Page 5 of 14 [PUBLIC] 
Graph 2 
4.6 Directorates comply with the findings identified in all RIDDOR Incident Investigation
reports which detail corrective actions to help prevent reoccurrence. Directorates
also share their RIDDOR incidents and findings with the Corporate Health and
Safety Group to help others learn from experience. 
All Incidents by Directorate 
4.7 Graph 3 below gives an analysis of the total number of all incidents that have
occurred over the 3-year period and breaks down the incident statistics by
Directorate. 
Graph 3 
4.8 This shows that over the 3-year period, Communities & Education recorded the
most incidents with a total of 3041, Health & Social Care Partnership returned 586
and Place 242. These totals include aggression and violence incidents. Please
Note: In 2020/21 within Communities & Education, there was a significant reduction
in the number of incidents, however this covers the period of school closures
through the COVID-19 lockdown.
RIDDOR Incidents by Directorate
20
16
15
10 11 10 10
10 7 8
5
5 4
0
Communities Health and Social Care Partnership Place
2020-21 2021-22 2022-23
1400
1200
1000
800
600
400
200
0
Total Incidents by Directorate  
1317 
1189
535
198 223 165
0 3 1 65 93 84
Chief Executives Communities Health and Social Care
Partnership
Place
2020-21 2021-22 2022-23
105

Page 106

10/08/2023 Page 6 of 14 [PUBLIC] 
4.9 Further detail on the incidents within these three Directorates is provided later in this
report; however, no further information is provided on Chief Executive’s as the
number of incidents is very low. This helps to focus attention on the most significant
areas. 
Most Common Incidents (excluding Aggression and Violence) 
4.10 Graph 4 below shows the total number of incidents by cause (excluding
Aggression and Violence) across the Council over the past 3 years. 
Graph 4 
4.11 The incident type showing the highest numbers across the 3-year period is ‘Slip Trip
and Fall’ with 243 incidents, Struck Against/Struck By with 217, Use of Work
Equipment 66 and Manual Handling 56. 
4.12 The reporting of near miss incidents is a pro-active way of investigating issues
before they become accidents/incidents where people are injured, and a high
number of Near Miss Incidents is a positive safety performance indicator The Near
Miss Campaign in 2018/19 raised awareness and encouraged employees to report
Near Misses. Graph 4 above shows that we had 25 more Near Miss Reports last
year compared to this year. 
Aggression and Violence Incidents 
4.13 Graph 5 below gives an indication of where the most aggression and violence
incidents are taking place, with Communities & Education returning the most
incidents. Significant work is ongoing in the directorate to both to ensure all
incidents are recorded and to ensure that an early intervention and prevention
approach is taken to health and safety. A more detailed breakdown can be
found later in this report. 
4.14 H&SCP have been pro-active in ensuring that staff are reporting all incidents of
physical and verbal aggression towards staff, however minor. 
4.15 Place Directorate are returning low numbers however still realise the need to train
staff, and as a result, Corporate Health and Safety have been continuing to deliver
Aggression and Violence training to Housing employees.
Type of Incident (exc Aggression & Violence)
120
100
80
60
40
20
0
85 88 96
76 70
56 65
15 25
16
51 36 14 24 28
5 3 8 0 1 5 8 11 7 19
0 1 2 1 3 5 9 7
2020-21 2021-22 2022-23
106

Page 107

10/08/2023 Page 7 of 14 [PUBLIC] 
Graph 5 
1400
1200 
Aggression & Violence Incidents by Directorate 
1159 
425 
Communities 
122 140 118 
Health and Social Care Partnership
2020-21 2021-22 2022-23 
12  24 
Place 
26
1000
800
600
400
200
0
4.16 Graph 6 gives more detail on the type of aggression and violence incidents that are
taking place across all Directorates, with physical violence being the most significant
cause. 
Graph 6 
Analysis of Incidents by Directorate
Place Directorate
4.17 Graph 7 below gives a detailed analysis of the common types of incidents
(excluding Aggression and Violence) within the Place Directorate.
2020-21 2021-22 2022-23
Verbal Abuse Threatening/Intimidating Behaviour Physical Violence
0
103 115 74 134 202 131
800
600
400 354
200
854 1000
Aggression & Violence Incidents by Type
1066 1200
107

Page 108

10/08/2023 Page 8 of 14 [PUBLIC] 
Graph 7 
4.18 For the year 2020/21 there was a total of 53 incidents, 69 for 2021/22, and 58 for
2022/23, however, COVID 19 impacted on the figures returned for 2020/21. Over
the 3-year period, the type of incident returning the highest numbers was ‘Slip Trip
Fall’ (49) ‘Struck Against/Struck by Object’ (42), ‘Manual Handling’ (27), and Use of
Work Equipment’ (25) 
4.19 With reference to graph 2 in the report, we can see that RIDDOR incidents have
increased slightly on last year with a total of 10. We continue to roll out learning
outcomes from all our incidents and with increased training and awareness the
focus is to drive the number down. 
4.20 Focusing on 2022/23 activities, improvements have been made in the following
areas:
• Streetscene bin and dog waste collection routes were visited to review
manual handing concerns.
• Provided support and guidance for public events including pedal Irvine and
motorcycle safety events.
• Met with trade union representatives to discuss aggression & violence at
HWRC sites.
• Provided guidance for the change in approach to COVID-19 and return to
work within the buildings. Toolbox talk developed for vehicle use.
• Visited Eglington Country Park and Mackerston Play Park to review play
equipment following an incident.
• Visited various schools with insurance and risk to review external fire safety
for schools during the holidays.
• Met with the Ardrossan hostel to review staff security and fire safety.
• Assisted the new Lochshore hub with fire risk assessments, fire evacuation
and their opening day.
• Reviewed pedestrian and vehicle segregation at Dreghorn Primary school
following a serious near miss incident with facilities management.
• Visit to Garnock Campus to review vehicle parking interference with delivery
loading and unloading at the kitchen loading area.
• Manual handling risk assessments for Streetscene, Waste and Facilities
Management.
Place Incidents (exc Aggression & Violence)
25
20
15
21
16
12
19
16
9 11 10
10
5
0
7 4 4 7 5 7 7 8
4 4 5
1 0 1 0 0 0 1 0 0 1 0 0 0 0
2020-21 2021-22 2022-23
108

Page 109

10/08/2023 Page 9 of 14 [PUBLIC] 
• Refuse collection team to review the manual handling of wheelie bins.
• Slip, Trip Fall Campaign was again launched at the start of winter. 
4.21 With regards to the control of Hand Arm Vibration, we have re-created a version of
the HSE Exposure Calculation which can be used on a phone or tablet to record
operative’s use. The HAVs meter has been recalibrated and a few members from
Streetscene received training on using the HAVs meter. The next step is now to
appoint an employee to measure and record the vibration from equipment and input
this into the exposure calculator to allow employees to start recording their
equipment usage. 
4.22 Looking towards 2023/24, the Place Directorate will focus on improvements in the
following areas: Slip, Trip, Fall awareness, Hand Arm Vibration, Manual Handling,
Fire Safety, Incident reporting and Investigation and aggression & Violence. 
Health and Social Care Partnership 
4.23 Graph 8 below gives a detailed 3-year breakdown of incidents within the Health and
Social Care Partnership (excluding aggression and violence). This shows that
2020/21 returned 76 incidents, 2021/22 returned 96 and 2022/23 returned 47. 
Graph 8 
4.24 Over the 3-year period, the incident type returning the highest numbers is ‘Slip Trip
Fall’ with a total of 65. The next highest incident type is ‘Struck Against/By Object’
with 33, followed closely by ‘Manual Handling’ with 24 and ‘Vehicle’ incidents with a
total of 19. Vehicle incidents are down by 2 compared to last year and down by 14
compared to 2020/21. 
4.25 Near Miss Incident Statistics are pro-active indicators, and are up by one on last
year, however numbers are still low. It is hoped that these numbers will increase
with the introduction of the new health and safety reporting system, Assure, in 2023. 
4.26 With reference to RIDDOR incidents, graph 2 shows that the RIDDOR incidents are
on a downward trend, down by 3 compared to last year and down by 6 on the
previous year. The majority of RIDDOR incidents within HSCP are in relation to
direct assistance/personal care with service users whose needs are becoming more
varied and complex.
HSCP Incidents (exc Aggression & Violence)
35
30
25
20
15
10
5
0
29    26 
20
13 121415 15
4 3 7 10 6 7 6
0 0 0 1 2 1 5
0 0 0 0 0 0 2 2 2 3 1
2020-21 2021-22 2022-23
109

Page 110

10/08/2023 Page 10 of 14 [PUBLIC] 
4.27 HSCP continue to assist NHS Ayrshire and Arran in the delivery of the
Spring/Summer 2023 Covid-19 Booster Vaccination programme to cohorts identified
as “at risk”. Planning has also commenced for the Winter Covid-19 and Seasonal
Flu Vaccination Programmes.
4.28 HSCP along with East and South Ayrshire colleagues are in the process of planning
the Childhood Flu Programme across Ayrshire. Clinics will be delivered within
nurseries, primary & secondary schools and local centres.
4.29 HSCP continue to maintain a reduced PPE distribution centre to the Care at Home
workforce mainly gloves, aprons, wipes, gel etc. Full body coveralls and shoe
coverings are also held as per infection control guidance and risk assessments.
4.30 The Partnership have developed a bespoke training hub for Care at Home staff in
the former Castleview Day Services building in Glasgow Street, Ardrossan. The
facility will act as a hub for staff working within the service to learn the essential
moving and handling skills they require in their day-to-day role, allowing them to
move and position clients safely, respectfully, and in a way that promotes their
independence, dignity and functional mobility. 
The space contains classroom areas for theoretical training sessions, with additional
areas set up to mirror a home environment including a living room area, bedrooms
with different types of beds and a shower room. 
These zones will allow staff to learn how to use a variety of lifting equipment such as
hoists, slings, slide sheets and other aids that they may encounter when caring for
people in their own homes, with moveable dividers meaning that the dimensions of
the rooms can be altered to mimic particular issues staff may encounter – in a
smaller or awkward shaped room, for example. 
Equipment is also in place that will allow more in-depth training on how to move
plus-size clients, including a suit that will allow staff to personally experience the
difficulties that plus-size clients may have when moving around, promoting empathy
and a greater understanding of the challenges faced by those they care for. 
In addition, Castleview offers space for Care at Home induction sessions,
medication training, SVQ work and meeting spaces. Staff can also pop into the hub
for advice and guidance. 
A staff wellbeing space has also been created within the facility, which is equipped
with massage chairs, calming mood-lighting and relaxing music.
4.31 Healthy Working Lives activities and information was promoted within the Service.
Information is circulated across the Partnership notifying staff of available activities
to assist with health and wellbeing across the workforce.
4.32 Scottish Government allocated funding to North Ayrshire Health & Social Care
Partnership in 2021/22, with additional funding being agreed by North Ayrshire
Integration Joint Board in 2022/23, to continue to support the wellbeing and mental
health of staff who work within the Primary Care and Social Care sectors, including
independent contractors, out of hours services and support staff.
110

Page 111

10/08/2023 Page 11 of 14 [PUBLIC] 
4.33 The Primary & Social Care Staff Wellbeing Grant Scheme continues and to date
327 grant applications have been received for a wide range of wellbeing activities
such as cycling and wellbeing retreats, yoga sessions, escape rooms, fitness and
wellbeing equipment, therapy treatments eg Reflexology, Reiki, Indian head
massage, team wellbeing and development days. 
4.34 Staff continue to have opportunities to sign up for Mindfulness training and a
programme of Optima Health workshops: Nutrition; Keeping Active at Work;
Improving Concentration & Focus; Mental Health Awareness. Health checks are
being delivered in various settings in conjunction with KA Leisure Active
Lifestyles. All events and activities are offered to Primary & Social Care staff as well
as our third and independent providers. 
4.35 Taster sessions for Trauma Release Exercises (TRE) were delivered during April
and May 2023 and due to positive feedback, the 4-week TRE programme will be
offered to staff in the coming months. 
Partnership staff also continue to have access to free National Trust Passes
throughout the year. 
Communities & Education Directorate 
4.36 Graph 9 below gives a detailed analysis of incidents within the Communities &
Education Directorate (excluding aggression & violence), where across the 3 period,
‘Struck Against/By Object’ (140), followed by ‘Slip Trip Fall’ (129) and ‘Use of Work
Equipment’ (35) are showing the highest numbers. 
Graph 9 
4.37 Over the 3-year period, ‘Struck Against/By Object’ returned 140 incidents, Slip Trip
Fall 129 and Use of Work Equipment 35. 
4.38 With reference to Near Miss Incidents, this is a positive health and safety
performance category and would fall into the pro-active bracket as it results in
corrective actions being implemented to prevent an incident taking place where
someone suffers an injury. 2022/23 returned 25 less incidents than the previous
year. It is hoped that this number will increase with the introduction of the new
Incident Reporting System.
Communities & Education Incidents
(exc Aggression & Violence)
60
50
40
30
20
10
0
55 55 4648
35 42 43
30
20
0 0 0 0 1 1 7 8 6 0 1 4 0 0 2 1 3 5 5 12 18
0 1 1
2020-21 2021-22 2022-23
111

Page 112

10/08/2023 Page 12 of 14 [PUBLIC] 
4.39 With reference to Aggression and Violence, the following totals were generated
across the 3-year period, 2020/21 (425), 2021/22 (1007) and 2022/23 (1159). 
4.40 Graph 10 below gives further analysis and shows that over the 3-year period, the
highest number of incidents are taking place within the ASN sector with a total of
1,587, followed by primary schools with a total of 701 and secondary schools with
274. It is acknowledged and reported nationally that Covid and the ongoing
cost of living crisis has had an impact on behaviour in schools. In addition, in
2021, the 4 ASN Schools closed, and the pupils relocated to Lockhart
Campus. 
This change of environment understandably had an impact on the children and
young people, which has produced some challenges which has taken some time to
work through. However, quarter four statistics for 2022/23 were showing a slight
improvement and this is reflected in the overall annual totals with a reduction of 29
incidents. 
Graph 10 
4.41 Graph 11 below shows a comparison of the type of aggression and violence
incidents, where physical violence is returning the highest numbers with a dip in
2020/21 due to the lockdown school closure. 
4.42 Analysis of the data from the HSIR system shows that the number of recorded
incidents of aggression and violence in ASN schools was proportionally higher than
in other education settings. This was in line with expectations and relates to
specific additional support needs, including medical conditions. 
4.43 The health and safety reporting system allows staff to record incidents that they
believe to be unintentional, and with reference to the Aggression & Violence
incidents recorded last year (2022/23), 87 were deemed to be without intent.
Communities & Education Aggression & Violence by Location
800
700
600
500
400
300
200
683 654
346
220 250
135 142
93
100
0
1 11 14 39 0 0 3
Early Years Centre Primary Schools Secondary Schools Additional Support
Schools
Connected
Communities
2020-21 2021-22 2022-23
112

Page 113

10/08/2023 Page 13 of 14 [PUBLIC] 
Graph 11 
4.44 Staff and Trade Unions continue to work collaboratively to explore ways of trying to
reduce the number, type and negative impact of Aggression and Violence incidents;
Schools will continue to review pupil care plans in consultation with Parents/Carers
and Health Partners. A working group including the trade unions and Corporate
Health and Safety has been set up to look at ways of reducing the incidence of
aggression and violence incidents, including a focus on relationship based
approaches. The group will report into the Corporate Health & Safety Group on a
quarterly basis. 
Education continues to have a clear focus on improving current approaches to
aggression and violence, wellbeing and health and safety:
• 50 staff have been trained in the Mentors in Violence Programme which means
we now have 8/9 secondary schools taking part in the programme, reaching out
to over 1000 pupils;
• Promotion of Education Scotland’s National Health and Wellbeing Hub which
provides quick links to the most up-to-date Health and Wellbeing documents and
national programmes;
• Around 200 additional staff engaged with the Children and Young Person’s
Mental Health and Wellbeing (CYPMH) Professional Learning.
• The Health and Wellbeing workstream supported one Primary cluster to
implement the Scottish Government’s Whole School Approach to Mental, Health
and Wellbeing. A whole school approach is preventative, universal and includes
targeted interventions to ensure that all members of a school community can
flourish and sustain a state of being mentally healthy.
• Services continued to invest time and effort to repost Livewell opportunities and
initiatives through Service wide Sharepoint sites to promote uptake and
participation. 
• Finalising the Health, Safety and Wellbeing Action Plan and communicating this
via a range of platforms to all staff teams.
• Commencing a review and reform of Education Business Continuity Plans with a
focus on simplifying the template and raising awareness on risk management and
emergency planning.
Communities & Education Aggression & Violence by Type
1200
1002
1000
776 800
600
400 287
200 109 156 83 29 75 74
0
Physical Violence Threatening/Intimidating Behaviour Verbal Abuse
2020-21 2021-22 2022-23
113

Page 114

10/08/2023 Page 14 of 14 [PUBLIC] 
• Engaging with KA Leisure and the Council’s Equality & Health Improvement
Officer to understand and promote the wellbeing initiatives and opportunities
available to the workforce.
• Preparing for the changes set out by the Scottish Fire & Rescue in response to fire
alarm activations by conducting fire risk management reviews and developing and
communicating a package of training and awareness materials.
• Proactive reporting and monitoring of incidents and accidents across services and
establishments and escalating any items of concern. 
Education staff continued to assist with the sharing and promotion of any new initiatives,
processes and procedures relating to Health, Safety and Wellbeing. 
Connected Communities 
4.45 A short life working group was established to review and reform the Health, Safety
and Wellbeing (HS&W) Action Plan taking account of new and emerging priorities.
The document was endorsed by the Directorate Planning Group and Directorate
leadership team. 
4.46 There was a review and changes made to the format of the Directorate H&S
Planning group meetings to improve and widen membership and discussion points. 
4.47 The further investment was made on purchasing ICT devices to ensure site staff
had electronic access to communication tools to keep abreast of H&S updates and
wellbeing initiatives. 
4.48 The Services developed ‘H&S and Compliance’ SharePoint sites as a portal to store
relevant safety information and compliance documentation and to provide easy and
quick links to guidance, systems, and templates. 
4.49 Officers met with the Health Improvement and Equalities Officer to understand,
discuss and help promote opportunities relating to employee Wellbeing and in
particular, initiatives relating to Livewell. 
4.50 Work commenced by Community resources to scope out a transition to water-based
cleaning products to remove the need for PPE & COSHH assessments. A range of
benefits were identified by the team, mainly the environmentally friendly credentials
and removal of COSHH risks. Proof of concept was demonstrated, and plans were
underway for a phased roll out across all Community Facilities. 
4.51 Further detailed planning meetings took place on power resilience and Blackstart
with the development of awareness sessions and additional purchase and
114

Page 115

10/08/2023 Page 15 of 14 [PUBLIC] 
deployment of generators and kit for the establishment of Public Assistance
Centres. A learning conference event was hosted in November 2022, facilitated by
the Community Facilities Manager and the Councils Risk Manager.
4.52 Community Learning And Development discussions commenced to initiate a
review and reform of BCP’s with a risk-based approach.
4.53 All Service Business Continuity Champions actively engaged in Civil Contingency
Planning Groups (CCPLG) meetings and training sessions.
4.54 An internal working group was formed and tasked with the review and update of the
Venue Assistants Handbook. This documentation outlines safe systems,
compliance, and standards for operating community venues with links to Health and
Safety guidance. The draft document was ready for wider consultation and roll out.
4.55 The Community Association Handbook and Community Contract were revised to
incorporate H&S, risk, and compliance procedures. 
5 Corporate Health and Safety Planned Improvements
5.1 To meet the requirements of Health and Safety legislation in relation to the Duty of
Care and to improve the management of Health and Safety within the Council, it is
important to identify areas to improve the safety culture and performance at all
levels.
5.2 Corporate Health and Safety in conjunction with Directorates will seek to implement
continuous improvement in a variety of ways. The following improvement actions
are currently planned for 2023/24: 
• Implement the new Evotix Assure Incident Reporting System
• Develop guidance for the new Evotix Assure System
• Review and cascade new or amended Health and Safety Policies/Guidance
• Procure supplier for Lone Working Devices
• Procure new COSHH Assessment System
• Increase delivery of health and safety training for all Services. 
115

Page 116

116

Page 117

NORTH AYRSHIRE COUNCIL 
29 August 2023 
Cabinet 
Title:    Council Tax Multipliers: Scottish Government Consultation 
Purpose:  To consider the Consultation response in respect of the review
of the level of Council tax multipliers for Band E to Band H
properties 
Recommendation:  Cabinet is asked to approve the Consultation response from
North Ayrshire Council included in Appendix 1 and for this to be
submitted to the Scottish Government by 20 September 2023. 
1. Executive Summary 
1.1 The Scottish Government and COSLA launched a joint consultation on a proposal to
increase the level of increase (multipliers) in respect of Council tax band E to band H
properties.  This follows an agreement by COSLA leaders at the end of June 2023. 
1.2 Included in appendix 1 is the draft response from North Ayrshire Council.  The proposed
changes would impact those properties in Council tax band E to band H. 
1.3 Based on the current number of dwellings and the current levels of North Ayrshire
Council tax this proposed change would impact 21% of properties across North Ayrshire
and the annual increase would range from £143 (£2.75 per week) for a band E property
to £800 (£15.39 per week) for a band H property. 
1.4  Any increase in Council tax revenue would contribute towards the cost of providing vital
Council services and this is set within the context of significant inflationary related cost
increases contributing to a projected budget gap for the Council of over £16million in
2024/25. 
2. Background 
2.1 The Scottish Government and COSLA launched a joint consultation on a proposal to
increase the level of increase (multipliers) in respect of Council tax band E to band H
properties.  This follows an agreement by COSLA leaders at the end of June 2023. 
2.2 The proposal seeks views on a potential change to the current system of Council tax
multipliers.  Currently, Councils in Scotland set Council tax rates by determining the
rate for a band D property, with charges for bands A to C and E to H then calculated
as lower or higher proportions (multipliers) of the band D rate.  The size of the
Agenda Item 9
117

Page 118

multipliers is determined by national legislation and applies across Scotland, with the
last change occurring in 2017. 
2.3 The current Council tax rates are based on property valuations undertaken in 1991. 
Lower value properties and therefore, those in the lowest income deciles, currently
pay a proportionally higher level of Council tax when compared to the Council tax
relating to properties of a higher value.  To illustrate this point the Scottish Average
Council tax charge for a band A property as a proportion of a mid-point band A
property value represents a charge equating to 3.62% of the property value.  When
compared to the Scottish Average Council tax charge for a band H property as a
proportion of a mid-point band H property value this represents a charge equating to
1.33% of the property value.  In North Ayrshire Council, based on 2023/24 Council tax
levels the proportion for a band A Council tax charge to property value currently sits at
4.03%, with band H 1.48%.  If the proposed changes were applied to the Council tax
charges then band H would increase to 1.82%. 
2.4 The consultation proposes an increase to the multipliers affecting properties in band E
to band H.  When applied to current council tax rates in North Ayrshire the potential
increases are set out in the undernoted table: -  
Band Current
Charge £
Multiplier
Increase
Potential
Charge
Annual
Increase £
Weekly
Increase £
Band D £1,452.12 - £1,452.12 - -
Band E £1,907.92 7.5% £2,051.03 £143.11 £2.75
Band F £2,359.69 12.5% £2,654.67 £294.98 £5.67
Band G £2,843.73 17.5% £3,341.40 £497.67 £9.57
Band H £3,557.69 22.5% £4,358.17 £800.48 £15.39  
2.5 North Ayrshire has 70,217 dwellings which attract council tax.  A total of 55,467
dwellings (79%) sits within council tax band A to band D, with 14,750 dwellings (21%)
across band E to band H.  Around 25% of households in North Ayrshire receive
support from the Council Tax Reduction scheme and should the proposals be
implemented, this scheme should be expanded to recognise the additional burden
placed on households across the affected bands.  Based on the current number of
dwellings and the current levels of North Ayrshire Council tax this proposed change
would impact 21% of properties across North Ayrshire and the annual increase would
range from £143 (£2.75 per week) for a band E property to £800 (£15.39 per week) for
a band H property. 
2.6 Comparative council tax rates for England, Wales and Scotland for 2023/24 are
included in the table below.  The table reflects the proposals to increase the multipliers
is implemented:- 
118

Page 119

For comparative purposes, if the consultation proposals were implemented, council
tax rates for those in band A to band G would remain lower than the average charge in
England, while the average charge for band D properties would remain significantly
lower than in both England and Wales. 
2.7 The consultation also considers whether any proposed changes should be introduced
immediately or phased in over two or three years.  This should be considered within
the context of the financial challenges facing the Council, with an estimated budget
gap of over £16million in 2024/25 which has been influenced by the significant impact
of inflationary cost increases.  Any increase in Council tax revenue would contribute
towards the cost of providing vital Council services. 
2.8 The potential additional revenue generated for North Ayrshire Council is estimated at
£2.743million.  It is vital that, should the proposals be implemented, any potential
additional council tax revenue to local authorities is distributed to local authorities in an
equitable way, recognising that some local authorities have a greater proportion of
band E to band H properties than others.  Any potential additional revenue should not
be regarded as a substitute to the requirement for fair levels of grant funding from
Scottish Government.     
3. Proposals 
3.1 Cabinet is asked to approve the Consultation response from North Ayrshire Council
included in appendix 1 and for this to be submitted to the Scottish Government by 20
September 2023. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The proposals if implemented by Scottish Government could generate an additional
£2.743million. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 This is a consultation response. The proposals, if implemented, would financially impact
all households across band E to band H. This equates to 14,750 households across
North Ayrshire. 
Climate Change and Carbon 
4.5 None.
119

Page 120

Key Priorities 
4.6 The consultation response aligns with the key priorities of a sustainable council,
wellbeing and communities and local democracy. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 This is a national Scottish Government consultation launched on the 12 July 2023 and
it is due to close on 20 September 2023.  The consultation is open to all citizens and
organisations. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Mark Boyd, Head of Finance, on 01294 324560. 
Background Papers
0
120

Page 121

Appendix 1
Council Tax Multipliers: Consultation 
Respondent Information Form 
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/ 
Are you responding as an individual or an organisation?   
Individual 
Organisation
Full name or organisation’s name 
Phone number 
Address 
Postcode 
Email Address 
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing 
preference: 
Publish response with name 
Publish response only (without name) 
Do not publish response
We will share your response internally with other Scottish Government policy teams
who may be addressing the issues you discuss. They may wish to contact you again
in the future, but we require your permission to do so. Are you content for Scottish
Government to contact you again in relation to this consultation exercise? 
Yes         No 
North Ayrshire Council
01294 324560
KA12 8EE
North Ayrshire Council
Cunninghame House
Friar's Croft,  Irvine, 
markboyd@north-ayrshire.gov.uk
Information for organisations:
The option 'Publish response only (without
name)’ is available for individual
respondents only. If this option is selected,
the organisation name will still be
published. 
If you choose the option 'Do not publish
response', your organisation name may still
be listed as having responded to the
consultation in, for example, the analysis
report. 
121

Page 122

Appendix 1
About You Questions 
1. About you Question 1 
[For individual respondents] Please tell us which local authority area(s) you live in 
Local Authority Area(s): 
[For organisational respondents] Please tell us which local authority area(s) your
organisation operates in 
Local Authority Area(s): North Ayrshire 
2. About you Question 2 
If you pay Council Tax, please indicate which Council Tax band(s) apply to the
property (or properties) for which you pay Council Tax:
Band A
Band B
Band C
Band D
Band E
Band F
Band G
Band H
I don’t pay Council Tax
I don’t know 
122

Page 123

Appendix 1
Consultation Questions 
1. Do you think that Council Tax in Scotland should be changed to apply
increases to the tax on properties in Bands E, F, G, and H? 
Yes/ No/ Don’t know 
Please give reasons for your answer? 
This proposal provides greater parity with Council tax levels across England and
Wales for Council tax bands E to G, whilst protecting Council tax bands A to D.
The result of which would mean that bands E to G would generally still remain
lower than comparative levels in England and Wales, with bands A to D
remaining significantly lower. On balance these proposals reflect a fairer model of
Council tax charging. In North Ayrshire the additional annual charges would
range from £143 for band E (£2.75 per week) to £800 for band H (£15.39 per
week). It is important to recognise the additional financial burden that any
increase would have on families. Access to the Council Tax Reduction scheme
would not be impacted by this change and would continue to offer means tested
reductions of up to 100% to those households who meet the eligibility criteria.   
More Information: 
The table below presents current Council Tax charges in Scotland and shows the
rate for each band as a proportion of the rates applicable to Band D properties. 
Band A Band B Band C Band D Band E Band F Band G Band H
Scotland
Average
Council Tax
Charge
2023-24
£944 £1,102 £1,259 £1,417 £1,861 £2,302 £2,774 £3,470
Council Tax
charges as a
proportion
of the
charge for a
property in
Band D 
0.67 0.78 0.89 1.00 1.31 1.63 1.96 2.45 
2. The proposal is to increase the Council Tax on properties in Bands E, F, G
and H by 7.5%, 12.5%, 17.5% and 22.5% respectively. Do you agree with the
levels of increase set out in this proposal? 
Yes/ No/ Don’t know 
The current Council tax rates are based on property valuations undertaken in
1991. It is recognised that lower value properties and therefore, those in the
lowest income deciles, currently pay a proportionally higher level of Council tax
123

Page 124

Appendix 1
when compared to the Council tax relating to properties of a higher value. To
illustrate this point the Scottish Average Council tax charge for a band A property
as a proportion of a mid-point band A property value represents a charge
equating to 3.62% of the property value. When compared to the Scottish Average
Council tax charge for a band H property as a proportion of a mid-point band H
property value this represents a charge equating to 1.33% of the property value.
In North Ayrshire Council, based on 2023/24 Council tax levels the proportion for
a band A Council tax charge to property value currently sits at 4.03%, with band
H 1.48%. If the changes were applied to the Council tax charges then band H
would increase to 1.82%. 
3. If you have answered no to Question 2, what do you think the increases to
the Council Tax on properties in Bands E, F, G and H should be? 
o The increases should be smaller
o The increases should be greater
o Don’t know 
4. , When should any   increases be introduced if the tax on higher band
properties is increased as proposed? 
o Full effect from 2024-25
o Phased-approach over two financial years (2024-25 and 2025-26)
o Phased-approach over three financial years (2024-25, 2025-26, and 2026-
27)
o Other (Please state) 
The recommendation is to apply the full effect from 2024-25. In North Ayrshire
the additional annual charges would range from £143 for band E (£2.75 per
week) to £800 for band H (£15.39 per week). This would provide additional
revenue to fund vital council services, against a backdrop of significant
inflationary costs. 
More information: 
• Increasing Council Tax on properties in Bands E, F, G and H by 7.5%, 12.5%,
17.5% and 22.5% respectively would increase bills by around £139, £288, £485
and £781 per dwelling in these bands, based on 2023-24 Council Tax rates. 
• Changes could take effect from 2024-25, or could be introduced as a phased-
approach, with year-on-year increases over a number of financial years (e.g. for
Band H a £260 increase in each of the next three financial years starting from
2024-25, such that the full £781 (22.5%) increase does not apply until 2027-28).   
5. Should the Council Tax Reduction scheme be expanded to protect those on
lower incomes from any increases to higher band properties? 
Yes/ No/ Don’t know 
124

Page 125

Appendix 1 
More information: 
• In 2017, the Council Tax Reduction Scheme was expanded to provide relief to
households affected by the changes if their income was in the lower half of
incomes in Scotland. 
• The expanded Council Tax Reduction Scheme relief scheme protected low-
income households living in Bands E to H from the increase in their bill caused by
the increase in the multipliers, and is still available. 
6. The proportion of properties in each valuation bands E -  H varies across
the country. This means that some councils would benefit more than others
from any increases in council tax in these property bands. Should steps be
taken to ensure that all councils benefit proportionately from this policy? 
Yes/ No/ Don’t know 
Please give reasons for your answer? 
The key point to note is that any increased Council tax revenue generated from
this change will go towards funding vital Council services. This is set against a
very challenging financial landscape faced by Councils across the country which
has been impacted significantly through rising inflationary costs. Any overall
additional revenue generated should not be a substitute to the need for fair levels
of funding from Scottish Government. Across individual local authorities It is
recognised that some local authorities have a greater proportion of higher band
properties than others, therefore, it is recommended that the Scottish
Government work with Scottish Council Directors of Finance through the
Settlement and Distribution Group to ensure fairness and equity of revenue
distribution across all local authorities.       
More information: 
• If further changes were made to charges for property Bands E to H there
would be disproportionate benefits to some council areas where they have
more Band E to H properties relative to other councils. 
• General Revenue Grant is the main source of funding for local authorities. 
• The distribution of General Revenue Grant could be adjusted to ensure the
benefits are shared proportionately by all councils. 
• This adjustment would mean that any changes would not disproportionately
benefit, or disadvantage, any council. 
125

Page 126

Appendix 1
In North Ayrshire, based on the current 2023/24 levels of Council tax the proposed
increases would impact the Council tax payer as follows:- 
Current
Charge
2023/24 £
%
Increase
Potential
Charge
Annual
Increase
£
Weekly
Increase
£
Band D £1,452.12 - £1,452.12 - -
Band E £1,907.92 7.5% £2,051.03 £143.11 £2.75
Band F £2,359.69 12.5% £2,654.67 £294.98 £5.67
Band G £2,843.73 17.5% £3,341.40 £497.67 £9.57
Band H £3,557.69 22.5% £4,358.17 £800.48 £15.39 
It is recognised that such increases will have an impact on household finances
across the area. The Council supports an expanded Council Tax Reduction Scheme
to help protect eligible low-income households living in Bands E to H from the
increase in their bill caused by the increase in the multipliers.
7. Please tell us how changes to Council Tax rates for properties in Bands E,
F, G and H might impact you, or the people your organisation represents? 
More information: 
We have undertaken initial work to assess the potential impacts of these changes
for individuals and communities. We would welcome your views and comments to
help us better understand these impacts. 
Answer: 
Please provide your views 
8. Please tell us how you think changes to Council Tax rates for properties in
Bands E, F, G and H would affect your local area, or Scotland as a whole
(please consider social, economic, environment, community, cultural,
enterprise impacts that you think are relevant)? 
More information:
We have undertaken initial work to assess the potential impacts of these changes
for individuals and communities. We would welcome your views and comments to
help us better understand these impacts. 
126

Page 127

Appendix 1
Council
Tax Band
Number of
Dwellings % 
A 21,793  31.0% 
B 18,657  26.6% 
C 7,693  11.0% 
D 7,324  10.4% 79.0%
E 9,183  13.1% 
F 4,238  6.0% 
G 1,272  1.8% 
H 57  0.1% 21.0% 
70,217  100.0% 100.0% 
North Ayrshire is home to 134,220 residents (2.4% of Scotland’s population) with
around 70,000 dwellings for Council tax purposes. Based on the Scottish Index of
Multiple Deprivation (SIMD) datazone statistics across Scotland, North Ayrshire has
186 data zones, of which 52 (30%) are in the 15% most deprived in Scotland. Within
the Council Taxpayer base around 25% of Council Taxpayers are in receipt of
Council Tax Reduction, with approximately 20% receiving the maximum 100%
Council Tax reduction. In terms of property dwellings, 79% (55,467 dwellings) are
categorised within Band A to Band D and will therefore not be affected by the
proposed change to the multiplier, with 21% (14,750 dwellings) affected.
Answer: 
Please provide your views 
9. Please tell us how you think changes to Council Tax rates for properties in
Bands E, F, G and H might affect Island Communities 
More information:
• If further changes were made to charges for property Bands E to H there
would be disproportionate benefits to some council areas where they have
more Band E to H properties relative to other councils. 
• General Revenue Grant is the main source of funding for local authorities. 
127

Page 128

Appendix 1
North Ayrshire has 2 Island communities. Arran and the Isle of Cumbrae within the
North Coast locality. Based on recent Economic baseline analysis the working age
population in the Isle of Cumbrae is 11% lower than the Scottish average (i.e. 53%
versus 64% nationally) with the % share of the population over 65 years old sitting at
38% versus a national average of 19%. In terms of SIMD one of the 2 datazones
relating to Cumbrae fall within the top 15% most deprived areas in Scotland. The
majority of Council tax bandings fall within the Band A to Band D range and will
therefore not be affected by this potential change. Cumbrae has 1,343 dwellings that
attract council tax. A total of 1,221 (91%) of properties on the island fall within Band
A to Band D and will therefore be unaffected, with 122 (9%) across the Band E to
Band H range. The council supports an expansion of the council tax reduction
scheme to provide further assistance to eligible households. 
With regards to Arran, all but one of Arran’s datazones rank above the median
overall domain ranking and there is a much higher proportion of properties across the
Band E to Band H range. Arran has a total of 3,174 dwellings which attract council
tax. A total of 2,029 properties (64%) fall within the Band A to Band D range, with
1,145 properties (36%) across Bands E to H. 
It is also important to consider the correlation between this Consultation response
and that of the Council tax second home consultation. Both island communities have
a high proportion of second homes. North Ayrshire Council supports the policy of
having the powers to set any Council tax premium on second homes, however, the
extent to which will require further detailed modelling of consequences and any
unintended consequences. Therefore, any proposed increase in the level of Council
tax multiplier would form part of further modelling and impact assessments in respect
of the level of any potential Council tax premium related to second homes. 
• The distribution of General Revenue Grant could be adjusted to ensure the
benefits are shared proportionately by all councils. 
• This adjustment would mean that any changes would not disproportionately
benefit, or disadvantage, any council. 
Answer:
Please provide your views
10. Do you think there would be any equality, human rights, or wellbeing
impacts as a result of the proposed increases in Council Tax rates for
properties in Bands E, F, G and H ? Please tell us what you think these
impacts would be. 
Answer: 
Yes
128

Page 129

Appendix 1
This change would impact around 14,750 households across North Ayrshire (21%).
The consultation is open for citizens to express their views for the Scottish
Government to consider. The council supports an expanded council tax reduction
scheme to provide further support to those eligible households who require it. 
No 
Don’t know
Please give reasons for your answer. 
129

Page 130

130

Page 131

NORTH AYRSHIRE COUNCIL 
29th August 2023   
Cabinet 
Title:    North Ayrshire Council Plan 2023-28:  
Performance Management Framework 
Purpose:  To consider and agree the Council Plan 2023 – 2028
Performance Management Framework. 
Recommendation:  Cabinet agrees: (i) To approve the Council Plan 2023-28
Performance Management Framework attached at
Appendix 1; (ii) To refer the Performance Management
Framework to the Audit and Scrutiny Committee for
consideration. 
1 Executive Summary 
1.1 Our Council Plan 2023-28 is the overarching strategy of our Council and details
our Council’s strategic priorities.  We have a statutory duty to publish information
that enables effective scrutiny of our performance.
1.2 This report asks Cabinet to consider and approve the Council Plan 2023-28
Performance Management Framework (PMF) (Appendix 1).  This will be used
alongside updates on actions (listed in our Council Plan), case studies,
contextual information and priority Local Government Benchmarking Framework
(LGBF) indicators to demonstrate progress against our Council Plan priorities in
our six monthly Progress Reports.
2 Background 
2.1 Our Council Plan is our Council’s most important strategic document setting out
our vision of ‘a North Ayrshire that is fair for all’ and key priorities.  Our new
Council Plan 2023-28 was approved by Council on 21st June 2023.  It was agreed
that the supporting framework would be developed and presented to Cabinet for
approval following the summer recess. 
2.2 Many of the challenges North Ayrshire experiences are complex and longer-term
solutions are required to address them sustainably.  As a result, each Council
Plan is designed to build on the progress of the previous plan and a degree of
continuity can be identified in each.  In consideration of this, 13 indicators remain
relevant and continue from the previous Council Plan.
Agenda Item 10
131

Page 132

3 Our Performance Management Framework
3.1 Actively managing performance through the collection of accurate and relevant
information and setting informed targets is crucial to the successful delivery of
our Council Plan and demonstrating Best Value.  The Statutory Performance
Information Direction 2021 states local authorities must publish information that
compares with previous years as well as with other local authorities in order to
demonstrate Best Value.  Information must be presented in an accessible style
for all of our citizens and communities.  
3.2 As agreed at Council, performance will be measured through regular reporting
to Cabinet and the Audit and Scrutiny Committee.  
3.3 The framework measures are included at Appendix 1 alongside current
baselines and targets.  It contains a range of 26 performance indicators directly
linked to our priorities and our Council’s performance.  However, our Council
does not operate in isolation, and impact cannot be shown through numerical
measures alone.  Therefore the framework is part of a suite of information
provided through our Council Plan reporting to allow effective scrutiny of our
delivery.  This includes:
• The Inclusive Growth Dashboard Summary – A locally developed tool
that provides contextual data on trends within North Ayrshire and is
independent of the Council Plan PMF.  This includes indicators such as child
poverty rates, employability and area-wide climate measures.  A summary
will be provided in reporting to provide context to our performance.
• LGBF Priority Indicators – LGBF measures that directly link to our
priorities.  Ten are included directly in the PMF and a benchmarking report
is provided on all priority LGBF indicators annually.
• Action Updates – Published within our Council Plan and linked directly to
the delivery of our strategies throughout our Council, these provide
qualitative updates on progress and impact on our residents.
• Case Studies – Capturing real lived experience to help show the impact of
our Council, including through partnership working. 
3.4 We will review our Performance Framework regularly to ensure the information
continues to be relevant and takes account of any external changes or
opportunities.
3.5 In summary, the aim has been to produce a Council Plan Performance
Management Framework which is strategic, transparent and has the potential to
evolve over the lifetime of the Council Plan.  Most importantly it will help
demonstrate how we are working together to improve the lives of our people in
North Ayrshire and deliver a North Ayrshire that is fair for all. 
132

Page 133

4 Proposals 
4.1 Cabinet agrees: (i) To approve the Council Plan 2023-28 Performance
Management Framework attached at Appendix 1; (ii) To refer the Performance
Management Framework to the Audit and Scrutiny Committee for consideration. 
5 Implications/Socio-economic Duty 
Financial
5.1  There are no financial implications arising from this report.
Human Resources
5.2 There are no human resource implications arising from this report.
Legal
5.3 There are no legal implications arising from this report.
Equality/Socio-economic
4.4. There are no equality/socio-economic implications arising from this report. 
Climate Change and Carbon
5.4 There are no climate change and carbon implications arising from this report.
Key Priorities
5.5 The Performance Management Framework provides a robust basis for
scrutinising the delivery of our Council Plan strategic priorities for the next five
years.
Community Wealth Building
5.6 There are no Community Wealth Building implications arising from this report.
Consultation 
5.7 Consultation was undertaken with Chief Officers. 
Craig Hatton
Chief Executive of North Ayrshire Council 
For further information please contact Isla Hardy, Team Manager (Policy and
Performance), on 01294 324035 or email IslaHardy@north-ayrshire.gov.uk.
133

Page 134

Our Council Plan
Performance Management
Framework 
August 2023
Appendix 1
134

Page 135

Contextual Indicators
These indicators provide context to the environment in which we operate.  They form part of the
Inclusive Growth Dashboard which will be summarised in Council Plan 2023-28 repor�ng.
Description LGBF
Baseline
2022/23 
(or most
recent) Ambition
Popula�on No
134,220
(June
2021)
Increase
% of Children living in poverty a�er housing costs (LGBF) Yes 29%
(2021/22) Decrease
% of Households in Fuel Poverty No 28%
(2020/21) Decrease
% of working age popula�on in employment No
73.6%
(December
2022)
Increase
Propor�on of people earning less than the living wage
(LGBF) Yes 11.7%
(2021/22) Decrease
Area-wide CO2 Emissions (LGBF) Yes 5.43%
(2020/21) Decrease 
Council Plan Performance Indicators
These performance indicators are directly influenced by the work of our Council.  When considered
alongside the contextual indicators, ac�ons and case studies within repor�ng, they form a clear basis
for effec�ve scru�ny.
Description LGBF
Baseline
2022/23 
(or most
recent)
Target
2023/24
Target
2027/28
Number of residents participating in community learning
and development activity including youth work No 17,804 18,700 20,600
Percentage of children achieving their developmental
milestones at the time the child starts primary (LGBF) Yes 78.5%
(2021/22) 79% 80%
Average total tariff score of pupils living in the 20% most
deprived SIMD areas No 711
(2021/22) 714 TBD*
135

Page 136

Description LGBF
Baseline
2022/23
(or most
recent)
Target
2023/24
Target
2027/28
Overall average total tariff (Average tariff score: All Leavers) No 905
(2021/22) 908 TBD*
Average total tariff for Care Experienced Young People No 457 465 TBD*
Percentage of school leavers entering positive destinations
(LGBF) Yes 96%
(2021/22) 96.4% 97.5%
Number of unemployed people progressing into
employment supported by our Employability Service No 437 450 550
Percentage of procurement spent on local enterprises No 22.93%
(2021/22) 26% 27%
Number of new build housing units reaching completion (all
tenures) (Actual not cumulative) No 562 295 530
Number of empty homes brought back into use (Actual) No 123 200 200
Hectares of vacant and derelict land in North Ayrshire No 1,198
(2021/22) 1,094 1,000
Street Cleanliness (Street Cleanliness Index - percentage
clean) (LGBF) Yes 84.6% 87% 87%
(Overall) % of road network that should be considered for
maintenance treatment No 34.8% 34.8% 34.8%
Provided floor space of commercial/industrial space within
our Council portfolio (sq ft) No 400,991 404,755 435,600
Percentage of Council budget directed via participatory
methods No 2.74% 1.5% 2.5%
Number of Council assets under community management
(cumulative) No 49 54 65
Total installed capacity of low carbon heat and electricity
generation across the Council's estate (kW) (cumulative)
(LGBF)
Yes 11,680
(2021/22) 12,000 25,000
136

Page 137

Description LGBF
Baseline
2022/23 
(or most
recent)
Target
2023/24
Target
2027/28
Overall carbon emissions (tonnes) No 20,896 19,500 15,300
Proportion of council dwellings that are energy efficient
(LGBF) Yes 97.7%
(2021/22) 98.1%  99 % 
Length of new or improved active travel routes per annum
(metres) No 1,090 2,000 2,000
Number of trees planted under the North Ayrshire 2030
Tree Planting Strategy No 35,627 40,000 80,000
Proportion of operational buildings that are suitable for
their current use (LGBF) Yes 91.09%
(2021/22) 92.1%  92.5% 
Percentage of total household waste that is recycled
(calendar year as per SEPA) (LGBF) Yes 56.3%
(2021/22) 57% 57%
Percentage of Council dwellings that meet the Scottish
Housing Standards (LGBF) Yes 49.28%
(2021/22) 72.5%  99% 
Gross rent arrears (all tenants) as at 31 March each year as a
percentage of rent due for the reporting year (LGBF) Yes 7.14% 6.5% 4.5%
Percentage of income due from council tax received by the
end of the year (LGBF) Yes 93.34%
(2021/22) 94% 94% 
*The 2027/28 indicator and targets will be confirmed in response to the outcomes of the current
independent review of qualifica�ons and assessment. 
137

Page 138

138

Page 139

NORTH AYRSHIRE COUNCIL 
29 August 2023 
Cabinet 
Title:    Crown Estates Scotland – Memorandum of Understanding   
Purpose:  This report seeks approval to renew a Memorandum of
Understanding with Crown Estates Scotland.   
Recommendation:  Cabinet approves that the Council continues the partnership
agreement with Crown Estates Scotland, to further explore
investment opportunities to support North Ayrshire Council’s
regeneration and economic development priorities.   
1. Executive Summary 
1.1 Cabinet of March 2020 approved the proposal for North Ayrshire Council to enter into
a partnership agreement with Crown Estates Scotland (CES) to explore investment
opportunities to support North Ayrshire’s regeneration and economic development
priorities. 
1.2 The Council and CES subsequently signed a Memorandum of Understanding (MoU)
following the Cabinet approval of March 2020, with CES having an enabler and co-
ordinator role. However, the MoU has now lapsed (as of March 2023) and requires to
be renewed to enable the partnership to continue.   
2. Background 
2.1 CES was established in 2017 to manage the Crown Estate’s assets, to support
sustainable development generally, and economic development, regeneration, social
and environmental well-being specifically. 
2.2 CES manages the seabed property rights adjacent to and associated with North
Ayrshire.  They also manage parts of the foreshore of North Ayrshire and have
numerous agreements across the region in relation to ports and harbours, cables and
pipelines, aquaculture and outfalls.
2.3 They are committed to their vision of ‘communities and businesses thriving through
enterprising and sustainable development of property and natural resources’. They
aim to work with local communities on benefits realisation, having regard to the
principles of inclusive growth and community wealth building.
Agenda Item 11
139

Page 140

2.4 The partnership during the first MoU explored a range of options for investment
opportunities for CES including supporting a number of Ayrshire Growth Deal projects
- the i3 Flex Space industrial programme at Irvine, investment at Hunterston and
expansion of the Maritime Museum as part of the Great Harbour Programme in Irvine.
However, no investment opportunities were identified due to lack of commerciality for
CES or financial benefit for NAC. 
2.5 CES has also funded 50% of the Marine Tourism Regeneration Manager post within
the Council’s Growth & Investment Team for the past two years. The post is focused
on identifying marine tourism investment opportunities in alignment with the Ayrshire
Growth Deal Marine Tourism Programme and also with progressing the Boat Based
Tourism Investment Challenge Fund which CES manage. 
2.6 An updated draft MoU has been prepared which has been the subject of discussions
between NAC and CES. The main joint working opportunities are now likely to arise
through the Ayrshire Growth Deal Marine Tourism Programme and the Boat Based
Tourism Fund. CES have indicated that it does not foresee additional capital
investment being available at the moment, but CES does continue to see a role for an
MoU between CES and NAC, to explore other support mechanisms to achieve
priorities shared between both organisations. In addition, CES have confirmed they
will continue to fund 50% of the NAC Marine Tourism post for a further two years. 
2.7 The Council and CES have provisionally agreed to have regard to the following areas
of opportunity as part of the updated MoU: 
• Projects that have potential to enhance value of the Scottish Crown Estate;
• Projects or activities which secure regeneration within North Ayrshire, and/or
development of coastal communities and the marine and coastal economy, including
marine tourism destination areas;
• Projects or activities which maximise sustainability, sustainable and inclusive growth
and promote Community Wealth Building;
• Support for projects or activities that involve third parties where combined efforts of
the parties can unlock new opportunities; and 
• Support for projects or activities which maximise the impact of the Ayrshire Growth
Deal investment, and other major capital investment programmes, and increase
capacity to leverage private sector investment and activity, resulting in investment in
communities and access to employment opportunities. 
2.8 While the purpose of the MoU is no longer primarily about seeking new capital
investment related to new projects, it is recommended that the Council renews the
MoU with CES as it would help provide a framework for partnership work with CES,
particularly around the Marine Tourism Programme and the Boat Based Tourism
Fund. It would also provide a framework to continue to support the jointly funded
marine tourism post working arrangements. 
140

Page 141

3. Proposals 
3.1 It is recommended that Cabinet: 
i) approves that the Council continues the partnership agreement with Crown
Estates Scotland, to further explore investment opportunities to support North
Ayrshire Council’s regeneration and economic development priorities.   
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no direct financial implications arising from the proposed updated
Memorandum of Understanding. CES have supported 50% of the funding of a Marine
Tourism post within the Council, which they have committed to for a further two years. 
Human Resources 
4.2 None. 
Legal 
4.3 The proposal involves the update of a Memorandum of Understanding, which has
been developed and discussed with Crown Estates Scotland, in line with the terms set
out in this report and in conjunction with Legal Services. 
Equality/Socio-economic 
4.4 There are no impacts arising from the proposed renewed agreement to work in
partnership to explore further opportunities for investment in North Ayrshire. Any
emerging proposals would be subject to future approvals and further considerations
would be given at that time to equalities and / or socio-economic implications.   
Climate Change and Carbon 
4.5 CES have stated that they support the sustainable development of property and
natural resources. In addition, the MoU will help support the delivery of the Marine
Tourism programme in North Ayrshire which includes projects that will have a number
of measures to reduce carbon emissions.   
Key Priorities 
4.6 The continued MoU with CES will contribute towards the four priorities in Our Council
Plan 2023 to 2028, in terms of Wellbeing, Communities and Local Democracy,
Climate Change and a Sustainable Council. In particular, CES are keen to ensure
their involvement in North Ayrshire provides positive community wealth building and
inclusive growth outcomes.    
141

Page 142

Community Wealth Building 
4.7 The proposal supports and promotes community wealth building as a key objective of
the MoU, with a focus on empowering coastal and island communities through the
identification and delivery of place-based projects.   
5. Consultation 
5.1 Consultation regarding the updated MoU has taken place with the Council’s Legal
Services team. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Neale McIlvanney, Interim Head of Service,
Economic Growth & Employability, on nealemcilvanney@north-ayrshire.gov.uk . 
Background Papers
0
142

Page 143

NORTH AYRSHIRE COUNCIL 
29 August 2023 
Cabinet 
Title:    Visitor Levy Consultation 
Purpose:  To seek Cabinet approval to respond to active consultations on
the Visitor Levy (Scotland) Bill; and set out working
arrangements for exploration of the potential benefit and impact
of a visitor levy. 
Recommendation:  It is recommended that Cabinet: 
a) Approves responding to consultations on the Visitor Levy
(Scotland) Bill in support of the introduction of a levy, subject to
further exploration of costs and benefits.
b) Notes the formation of an internal Visitor Levy Officer Working
Group which will engage with the Tourism Forum, businesses and
regional stakeholders to inform any future emerging proposals
related to the implementation of a visitor levy. 
1. Executive Summary 
1.1 The Visitor Levy (Scotland) Bill has been introduced to the Scottish Parliament. Under
the proposals within the Bill, the implementation of a visitor levy would be optional for
each local authority, but, if implemented, would allow councils to collect a levy on
overnight stays by visitors. 
1.2 The levy scheme has the potential to deliver additional income to North Ayrshire
Council to support services used by visitors. However, there are costs associated with
setting up and operating a visitor levy scheme and these need to be evaluated against
potential scheme income to inform any decision to implement a visitor levy within
North Ayrshire. 
1.3 This report sets out the background to the current consultation and required next steps
to assess the viability of introduction of a visitor levy and provides a basis for
responding to consultations on the current Bill. 
2. Background 
Visitor Levy Bill 
2.1 On 24th May 2023 the Scottish Government introduced the Visitor Levy (Scotland) Bill. 
This will give local authorities in Scotland a discretionary power to apply a levy to the
Agenda Item 12
143

Page 144

accommodation portion of overnight visitor stays in all or part of their area, to help
fund relevant local activities and services.  The Scottish Government has indicated
that the levy will give councils 'additional fiscal flexibility' and states that the levy
should be used to ‘facilitate achievement of objectives that relate to developing,
supporting or sustaining facilities or services which are substantially for or used by
those visiting the scheme area for leisure purposes’.  Local authorities intending to
introduce a levy are required to conduct a series of consultations and give 18 months
notice prior to implementation.  This means that the earliest a levy could be introduced
in Scotland is 2026. 
2.2 The levy will be a percentage of the accommodation portion of an overnight stay and
applies to most types of accommodation, including hotels, hostels, guest houses,
camping sites, caravan parks and boat moorings. The percentage rate will be set by
each local authority, with no cap on the level, however existing schemes elsewhere
typically apply a levy of between 1% and 7%. The levy can vary by location or date but
not by accommodation type. 
2.3 There is no Scottish Government financial support to set up a scheme; and each local
authority will need to meet the set-up and recurring costs of running a scheme. The
Scottish Government estimates costs of £110,000-£480,000 for set up, with recurring
annual costs of between £190,000-£500,000 per local authority.  Not all local
authorities will have sufficient visitor spend on accommodation for a scheme to be
cost-effective, and careful consideration needs to be given by each local authority to
the viability of a scheme in their area.  The identified new costs are consultation and
decision-making costs, including establishing a governance model, set-up costs and
ongoing admin costs, including monitoring, enforcement and communications. Those
costs need to be weighed against the potential income a levy might generate. 
2.4 Accommodation providers will also have costs associated with the introduction of a
levy, in terms of setup and administration, which could include changes to systems,
staff training, preparing returns to local authorities, additional record-keeping and
explanation of the scheme to visitors. 
2.5 Potentially many local authorities in Scotland will set up schemes, with much
duplication of cost and effort, however, the Bill creates provision for two or more local
authorities to act jointly to create a scheme. This creates provision to work regionally
within Ayrshire to explore operational and financial benefits that may arise from a
regional approach, if appropriate and beneficial.   
Visitor Levy Bill Consultation 
2.6 Following the introduction of the Bill there is now a further round of consultations by
the Scottish Government and SLAED, closing on 1st and 15th September, seeking
views on the proposals in the Bill, and on the implications for local authorities and
businesses. 
2.7 In previous consultations, North Ayrshire Council has agreed to support taxation
powers being given to Local Authorities, which included the visitor levy, and
responded to Scottish Government consultations and it is proposed to maintain in
principle support to the Bill through the current consultation, subject to exploration of
financial and operational arrangements. 
144

Page 145

2.8 The Bill consultation seeks responses to the consultation in a questionnaire format,
and the proposed Council response is attached as Appendix 1. In completing the
questionnaire, engagement with the Tourism Forum, an Elected Member Briefing
session and engagement with officers at East and South Ayrshire Councils has taken
place to incorporate views of members and to provide consistency of approach across
Ayrshire, where appropriate. 
2.9 The response to the Bill will also inform responses to ongoing consultations on the
visitor levy by SLAED and the Government Finance Committee. 
Next Steps 
2.10 As it is not possible to undertake detailed assessment of the viability of a visitor levy
scheme in advance of responding to the Visitor Levy Bill consultation, essential work
needs to be done to explore the options for a delivery model, assess the opportunities,
and undertake detailed analysis of potential costs and financial benefit of a scheme
based on suitable information. Accordingly, a short-life officer working group will be
formed with council officers from relevant services to explore the financial and
operational implications of the Visitor Levy to be able to recommend future proposals
related to the implementation of a visitor levy. It is anticipated that this process will
include engagement with the Tourism Forum and industry stakeholders. It is also
anticipated that working arrangements will include engaging with East and South
Ayrshire councils to clarify any regional implications or opportunities within the process
of identifying options for the implementation of a visitor levy scheme. 
3. Proposals 
3.1 It is recommended that Cabinet: 
a) Approves responding to consultation on the Visitor Levy (Scotland) Bill in
support of the introduction of a levy, subject to further exploration of costs and
benefits.
b) Notes the formation of an internal Visitor Levy Officer Working Group which will
engage with the Tourism Forum, businesses and regional stakeholders to
inform any future emerging proposals related to the implementation of a visitor
levy. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications from responding to consultations, creating an
internal working group and engaging with our colleagues in neighbouring local
authorities.  A future paper will be brought to Cabinet outlining the findings of the
working groups.  
145

Page 146

Human Resources 
4.2 Responding to consultations and taking part in working groups will be coordinated
within existing staff resource. 
Legal 
4.3 None 
Equality/Socio-economic 
4.4 None 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 This proposal is linked to the priority outcome contained in the Council Plan for North
Ayrshire to have vibrant, welcoming and attractive places. 
Community Wealth Building 
4.7 None 
5. Consultation 
5.1 Consultation has taken place with the member/officer Tourism Forum and feedback
from members has been reflected in the draft response to the Visitor Levy Bill
consultation. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Neale McIlvanney, Interim Head of Service,
Growth, Investment and Employability, on nealemcilvanney@north-ayrshire.gov.uk. 
Background Papers
0
146

Page 147

SLAED Response to Visitor Levy (Scotland) Bill Consultation 
1. What are your views on whether local authorities should have a power to place a
levy (a type of additional charge or fee) on top of the price charged for overnight
accommodation in their area? 
In principle North Ayrshire Council is in favour of local authorities having this
discretionary power, however the means of calculation and guidelines on scheme
design, set-up and implementation need further consideration. 
2. Given that the Bill is likely to result in different councils introducing a visitor levy
in different ways or not doing so at all, what impact do you think the Bill will
have in your area and across different parts of Scotland? For example, this
could include any impact (positive or negative) on local authority finances, local
accountability and flexibility, businesses, or on numbers of overnight visitors. 
• Local authorities will have to meet front-end costs in the two years prior to
the introduction of the scheme. This leaves them financially exposed and
means that once the scheme is operating it may be some time before the
costs are repaid and the scheme delivers useable proceeds.
• Businesses equidistant from a visitor attraction may fall either side of a local
authority boundary, with different/no levies, making one more attractive
to/cost effective for a visitor.
• Local authorities with a large number of accommodation providers will
potentially have a large financial boost to their visitor facilities and services,
making them more attractive and widening the gap between those in honey-
spot areas and those in more disadvantaged areas, which are the areas
that could potentially benefit most from investment in tourism.
• Accommodation providers considering location of their business or setting
up an additional business may decide to locate outwith a levy area.
• Local authorities may be under pressure to ringfence levy spend in the area
in which the levy is raised. E.g. in North Ayrshire, almost half of our visitor
accommodation is on Arran. 
3. Do you agree with the Bill’s definitions of a “chargeable transaction” and of
“overnight accommodation”? If not, what definitions do you think would be
better? 
The definition of a chargeable transaction is too open to abuse. An
accommodation provider could essentially offer a ‘free’ bed and present an
overnight charge which they can attribute to breakfast, parking, servicing,
marketing, etc. This could prove very difficult to manage and take up local authority
time and resources, reducing potential scheme income. 
147

Page 148

4. What are your views on the Bill’s proposal to allow councils to set the levy as a
percentage of the chargeable transaction? Are there any other arrangements
that you think might be better? If so, please give examples and a short
description of the reasons why. 
Unless the levy is a percentage of the overall transaction it is open to abuse.
Accommodation providers could claim that most of the cost of the stay is non-
chargeable. A flat percentage on the whole transaction or a flat £ charge is more
transparent and more manageable. However, while a flat £ charge is more
manageable it would have to be tiered so those who provide lower cost
accommodation (e.g. campsites) were not disproportionately affected. 
5. What are your views on the absence of an upper limit to the percentage rate
(which would be for councils to decide) and that it could be different for different
purposes or different areas within the local authority area, but not for different
types of accommodation? 
The Bill should contain an absolute upper limit to the percentage rate. It would be
more flexible if it could be varied for different types of accommodation, particularly
if a local authority is trying to encourage growth of certain types of accommodation
providers within its area, perhaps to bring a wider offering to appeal to more types
of visitors. 
6. The Bill would allow councils to apply local exemptions and rebates to some
types of guests if they choose to. It also allows the Scottish Government to set
exemptions and rebates on a national basis where it considers it appropriate.
What are your views on the Bill’s proposals in relation to exemptions and
rebates? 
While exemptions and rebates would make the scheme fairer (e.g. islanders
staying in accommodation on the mainland due to a hospital appointment), the
practicalities of managing exemptions could be challenging for the accommodation
providers. For instance, would they have to ask all of their guests why they are
staying there? It seems like an invasion of privacy. It also means the scheme is
open to potential abuse by visitors claiming their stay is for an exempt purpose, so
there would need to be a level of ‘proof’ of exempt purposes, which again
increases the administrative burden for all parties. 
7. Do you agree with the Bill’s requirements around the introduction and
administration of a visitor levy scheme, including those relating to consultation,
148

Page 149

content, and publicity (Sections 11 to 15)? Are there any other requirements you
think should be met before any introduction of the levy in a given area? 
8. What are your views on the Bill’s requirements for local authorities in respect of
records keeping, reporting, and reviewing? (Sections 16, 18 and 19) 
There will be a huge duplication of work across local authorities as they each
establish systems to set up and then manage the scheme. This is an unnecessary
front-end cost. A centrally designed scheme with suitable software and systems
which could then be purchased/adopted by individual local authorities would be
more cost-effective. 
9. The Bill requires that net proceeds of the scheme should only be used to
“achieve the scheme’s objectives” and for “developing, supporting, and
sustaining facilities and services which are substantially for or used by persons
visiting the area of the local authority for leisure purposes.” Do you agree with
how the Bill proposes net proceeds should be used and if not, how do you think
net proceeds should be used?
The Bill needs to allow flexibility about how the net proceeds should be used
locally to reflect local circumstances. While the statement above does capture the
spirit of the intention of the Bill, there should be acknowledgement of local
circumstances informing what the net proceeds can be used for. 
10. What are your views on the Bill’s requirements for accommodation providers to
identify the chargeable part of their overnight rates, keep records, make returns,
and make payments to relevant local authorities? Are there any other
arrangements that you think would be better, for example, by reducing any
“administrative burden” for accommodation providers? 
• Unless the levy is a percentage of the overall transaction it is open to
abuse. Accommodation providers could claim that most of the cost of the
stay is non-chargeable. A flat percentage on the whole transaction or a flat £
charge is more transparent and more manageable for the providers.
However, while a flat £ charge is more manageable it would have to be
tiered so the lowest cost providers and those who provide accommodation
to arguably the most disadvantaged visitors (e.g. campsites) were not
disproportionately affected.
• Where an accommodation provider operates businesses in more than one
local authority, they may have to manage reporting at different levy rates to
different local authorities. If they have a central booking system this
becomes even more complicated.
149

Page 150

• Accounting software used by many small businesses may not have the
flexibility to manage the levy and exemptions which could add to the cost
and complexity for the providers. 
11. Do you have any comments on Part 5 of the Bill (Enforcement and Penalties and
Appeals)? Are there any other arrangements that you think might be more
appropriate in ensuring compliance and reducing the risk of avoidance? 
Enforcement could potentially be a very expensive aspect of the scheme.  The
powers given to local authorities to enter premises and seize documents seem
very heavy-handed and there is potential for human rights/privacy issues with
enforcement, e.g. an individual offering bed and breakfast in their own home. 
12. Do you have any comments on the issues that the Scottish Government
proposes to deal with in regulations after the Bill has been passed? (Set out in
the Delegated Powers Memorandum) Are there any that you think should be
included in the Bill itself rather than being dealt with by regulations and if so,
why? 
13. Do you have any comments on the accuracy of the estimated costs for the
Scottish Government, local authorities, accommodation providers and others as
set out in the Financial Memorandum and Business and Regulatory Impact
Assessment (BRIA)? 
150

Page 151

NORTH AYRSHIRE COUNCIL  
29 August 2023 
Cabinet
Title: Tree and Woodland Management Policy 
Purpose: To seek Cabinet approval on the proposed updated Tree and
Woodland Management Policy. 
Recommendation: That the Cabinet approves the updated Tree and Woodland
Management Policy, attached at Appendix 1. 
1. Executive Summary 
1.1 Trees and woodland have a significant effect upon the quality of life within the area.
They provide environmental, aesthetic and amenity value and support the Council’s
wider strategic objectives. For example, helping to become carbon net zero by 2030,
supporting biodiversity, providing an attractive environment, contributing to
regeneration and improving health and wellbeing. To help contribute towards carbon
net zero, the Council has a target to introduce 108,000 new trees by 2030 as part of
North Ayrshire’s 2030 Woodland project. 
1.2 The Council is responsible for over 275 hectares of woodlands within its area. There
are a number of legal obligations placed upon the Council in relation to the
management of trees and woodlands, for which it is responsible. 
1.3 The Council receives a high number of enquiries in respect of trees within its area. 
This formal policy enables the Council to outline how it will discharge its responsibilities
and manage its tree and woodland stock in a sustainable way. 
1.4 People often live in close proximity to trees which can occasionally cause an
inconvenience. The Tree and Woodland Management Policy aims to capture the
Council’s position on the most frequent tree related enquiries. 
2. Background 
2.1 The current Tree and Woodland Management Policy was approved by Cabinet in 2013
and has been in use since that time. 
2.2 The policy has been reviewed by relevant members of the Streetscene Service, with
input from the Roads Service, and updated accordingly to consider recent council
policies and strategies, such as North Ayrshire’s 2030: Tree Planting Strategy. The
Tree and Woodland Management Policy is attached at Appendix 1. 
2.3 The main changes to the policy are an acknowledgement of the ambition to reach net
zero by 2030 and the Council’s actions to support this. The complaints process has
also been amended and is now aligned to and will be dealt with through the already
established North Ayrshire Council Complaints Procedure. 
Agenda Item 13
151

Page 152

2.4 North Ayrshire Council has set a target to introduce 108,000 new trees by 2030 as part
of ‘North Ayrshire's 2030 Woodland’ plan which aims to contribute to the Council’s
wider efforts to reach net-zero carbon emissions. Progress against this initiative has
been good with 35,627 new trees planted, as of 19 July 2023. In terms of replacement
trees, if trees have to be removed, we aim to replace on a like for like basis where
possible, or appropriate, to do so. If it’s not possible to do so, we will plant a
replacement tree of a suitable species at a suitable location. 
3. Proposals 
3.1  That the Cabinet approves the updated Tree and Woodland Management Policy
attached at Appendix 1. 
4. Implications/Socio-economic Duty
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 There are a number of legal responsibilities and duties placed on the Council in
relation to the management of its tree and woodland stock, which are described in the
policy attached at Appendix 1.   
Equality/Socio-economic 
4.4 None.  
Environmental and Sustainability 
4.5 Trees and woodland areas provide a significant contribution to the overall
environmental wellbeing of an area. 
As trees absorb substantial amounts of carbon from the atmosphere, trees play a vital
role in helping to combat climate change and to achieving the Council’s target of
achieving net zero carbon emissions. 
Trees and woodlands are integral to the Council’s Environmental Sustainability &
Climate Change Strategy (ESCCS) 2021-23 and contribute towards a sustainable
environment. 
Key Priorities 
4.6 The network of trees and woodlands positively contributes to the Council Plan 2023-
28 of which a key priority is Climate Change. One of the Key Activities of the Council
Plan is 'Promoting new woodland creation and protecting our green spaces to provide
a natural resource for carbon sequestration.’
The strategy and initiative also play an important role in delivering against Scotland’s
152

Page 153

Public Health Priority 1 of ‘A Scotland where we live in vibrant, healthy and safe
places and communities.’   
Community Wealth Building
4.7  The Tree and Woodland Management Policy aligns with the Council’s Community
Wealth Building mission of “Enhancing local wealth and the creation of fair jobs and
maximising the potential of all our places through working in partnership with our
communities and businesses.” This includes working with communities on the
development of community orchards and ‘wee forests.’   
Consultation 
5.1 The Tree and Woodland Management Policy has been reviewed and updated to align
with national guidance and reflect recent Council strategies, policies, and priorities. 
5.2   Consultation has taken place within the Council’s Streetscene Service and Roads
Service. 
5.3 The Policy Advisory Panel were consulted and provided feedback on the revised policy
on 18 April 2023. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Service (Neighbourhood
Services), on 01294 324570. 
Background Papers
Appendix 1 – Tree & Woodland Policy 
153

Page 154

Page 1 of 12 
North Ayrshire Council
Tree and Woodland Management Policy 
1. Introduction 
1.1 Trees are an essential asset and yet at the same time can be seen as
being highly emotive, both in terms of perceived nuisance and of the
benefit they provide. They can form important local landmarks and
landscape features whilst making a tremendous impact on visitors and
residents alike, providing significant aesthetic, amenity, economic and
ecological benefits and help contribute to a healthier environment. 
1.2 The Council is responsible for many thousands of trees and over 275
hectares of woodland within the area. A programme of assessment and
inspection has commenced although given the number and extent of
trees within the area it is anticipated that this will take many years to
complete. The Council also has an obligation to survey trees within their
portfolio, in line with Health and Safety at Work etc Act 1974. 
1.3 There are a number of legal obligations placed upon the Council in the
management of trees and woodlands for which it is responsible. 
1.4 The aim of this policy to set out how the Council will effectively manage
trees and woodlands for which it is responsible ensuring that they
positively contribute to the area and achievement of the corporate
priorities of the Council whilst meeting legal obligations. The policy does
not consider trees within private ownership unless the Council has a
legislative responsibility or power in respect of their management. 
2. Effective Tree and Woodland Management 
2.1 The Council seeks to manage its trees and woodland in an effective
manner in the following ways:- 
 Providing and maintaining healthy and safe trees.
 Maintaining and encouraging biodiversity.
 Maintaining and improving landscape quality via the care of
existing trees and the inclusion of future plantings.
 Compliance with legal responsibilities in both Common Law and
through Statute.
 Effectively communicating, educating and engaging with the public
and local communities.
 Providing clear channels of advice and information to the public
and other Council services regarding arboriculture and obligations
relating to the inspection and surveying of trees within their
ownership.
 Managing its woodlands in appreciation of the Ayrshire and Arran
Woodland Strategy. 
3. The Importance of Trees
154

Page 155

Page 2 of 12 
3.1 Trees are of vital importance to the landscape. They are living and
dynamic structures that, dependent up on species and location, can live
for generations. They are widely appreciated for enhancing rural and
urban environments and make a positive contribution to the scenic
character and diversity of the landscape. However, the benefits they
attach to the environment greatly extend beyond perceived visual amenity
and include:- 
 Social, educational, and communal benefits through connecting
people with nature.
 Embellish and reduce the impact of building development and hard
landscaping.
 Environmental benefits such as carbon sequestration, improved air
quality, screening from sun, wind, and rain, filtering noise and
attracting wildlife.
 Providing economic benefits, e.g. adding value to property and
reduced energy costs (windbreaks).
 Reduce surface water run-off and the effects of soil erosion.
 Green and leafy industrial sites, retail and/or shopping areas may
attract more inward investment than similar areas and sites devoid
of trees.
 Contribute to human physical and mental health and relaxation.
 Provide a sustainable resource. 
4. Tree Related Issues 
4.1 People often live in close proximity to trees, particularly in urban areas,
which can create varying degrees of inconvenience. These trees are
either their own, their neighbours’ or quite commonly belong to the
Council. Conflict or disputes can arise where a tree or group of trees
make an important contribution to the local environment yet create
inconvenience to residents. There are a number of common sources of
complaint including:- 
 Size and spread of tree canopy.
 Branches overhanging into gardens and the road.
 Low branches over footpaths.
 Trees blocking natural light, streetlights and road signs.
 Leaf and fruit fall.
 Sticky deposits.
 Physical damage to structures.
 Interference with utilities.
 Affecting TV and satellite reception.
 Affecting CCTV and security systems.
 Obscuring a view.
 Road safety issues.
 Fear of tree safety.
 Birds and wildlife. 
155

Page 156

Page 3 of 12 
4.2 Complaints often arise as a result of inappropriate species selection in
the past where trees increase in size until they reach maturity. In these
situations, it may be difficult or impossible to resolve in all parties’ favour.   
5. Trees on Council Land 
5.1 Parks, Open Spaces and Cemeteries 
Trees are fundamental aspects of parks and open spaces as they can
provide high levels of visual amenity and are valuable in encouraging use
of these sites by residents and visitors alike.  Parks are ideal for tree
planting as there are relatively few conflicts and species that would be
unsuitable elsewhere can be grown here.   
Cemeteries and churchyards often contain large specimen trees that
were planted out when these sites were first developed and can offer a
sense of calm for visitors. 
These areas are sanctuaries for wildlife and the existing trees are often of
historic or of great personal value to local communities. The many
decorative mature trees are characteristics of many sites providing
excellent flora and fauna values. 
5.2 Council Housing Areas 
A large proportion of the Council’s Housing stock was built in line with the
new town concept, particularly within the Irvine area. Extensive planting
of both trees and shrubs was undertaken both in garden areas and in the
surrounding open space using a wide range of species. These were often
quick growing to provide rapid greening including shrub beds and group
planting. Many trees were planted close to houses without full
consideration of future growth potential. The maturing of these trees has
given rise to a number of complaints from residents who live in close
proximity. 
Complaints or enquiries from tenants regarding trees within the housing
portfolio, including trees within tenant’s gardens and open space, will be
dealt with by the Housing Service with appropriate reference to the
Arboriculture Officer. 
5.3 Road Trees 
Road trees are those growing in pavements and verges along the
Council’s road network and are the responsibility of the Council as Roads
Authority. The Council is not responsible for trees alongside major trunk
roads or private roads and footpaths. 
Road trees are extremely important as they help to filter traffic pollution
and help to provide shade to car-parking and pedestrian passage. A tree-
lined street will improve the aesthetic and amenity appearance of a street
156

Page 157

Page 4 of 12 
itself. The Council values road planting as it presents a real opportunity to
improve environmental quality and image. However, consideration should
be given to the location of trees in relation to roads, windows to the front
of properties, overhead telephone wires, underground services, sight
lines, lighting, traffic controls and signs. The roots of trees can also
potentially cause problems with the surface of roads including pavements
and verges. Where a tree (or trees) on Council owned or adopted land is
deemed to be a danger to road users or pedestrians, or is causing an
obstruction, the Council as Roads Authority will take steps to make the
tree(s) safe or remove the obstruction. 
Where a tree on privately owned land is considered to be a danger to
road users or pedestrians the Council as Roads Authority will attempt to
contact the owner in order to remove the risk or obstruction. If there is no
immediate danger the Council as Roads Authority can serve notice on
the owner requiring them to undertake the necessary works within 28
days. Where the owner fails to comply with the notice the Council as
Roads Authority are empowered to carry out the necessary works and
recover expenses reasonably incurred from the owner. Where in the
Council’s opinion the danger from the tree is imminent then there is no
requirement to serve a notice and the Council as Roads Authority can
carry out the necessary works and recover expenses reasonably incurred
from the owner. 
5.4 Woodlands 
The Council is responsible for over 275 hectares of woodland. They
provide significant biodiversity and wildlife value, as the ground flora,
lower plant, fungi and invertebrate populations within them have
developed over many years and are specialised to that environment. The
long-established nature of these woodlands is reflected by the large
amount of self-seeded trees that are often densely located leading to
poor quality or weak specimens. 
The Ayrshire and Arran Woodland Strategy was published in 2014 as a
collaboration between North Ayrshire Council, East Ayrshire Council,
South Ayrshire Council, Ayrshire Green Network and Forestry
Commission Scotland. It seeks to develop the woodland of Ayrshire and
Arran as a model of integrated and sustainable use of land that supports
the local economy and contributes to the community wellbeing and that
also promotes environmental excellence. 
Whilst being mindful of this Strategy the Council’s primary objective is to
ensure that all its woodlands are enhanced and sustained on a long- term
basis with the involvement and support of local communities and schools
co-ordinated through the Countryside Ranger Service. 
Amongst other improvement works and where resources allow the
Council will seek to undertake appropriate thinning works to encourage
improved tree growth and the quality of specimens. Effective
157

Page 158

Page 5 of 12 
maintenance works will support the development of a range of woodlands
that can be used for public recreational use, wildlife habitat and for
educational purposes and the Council’s Local Biodiversity Action Plan. 
The creation of woodland paths has been utilised to encourage the public
to visit woodlands improving access to nature and the outdoors. 
6. Trees on Private Land 
6.1 Other than where the Council has a specific legislative responsibility such
as the administration of Tree Preservation Orders, the Roads (Scotland)
Act and within Conservation Areas, maintenance and management rests
entirely with the landowner who has a duty of care under Common Law. 
6.2 The Council will not undertake any works to privately owned trees unless
it has a legislative responsibility or power, or in emergency situations
where the owner cannot be identified and located. In these situations, the
Council will seek to recover any costs incurred from the owner. 
7. The Council’s Planning Responsibilities 
7.1 The responsibilities of the Council as the Local Planning Authority are set
out in the Town and Country (Scotland) Planning Act 1997 (as amended)
and the Planning (Listed Buildings and Conservation Areas (Scotland)
Act 1997. 
7.2 In granting planning permission for any development, the Council must
ensure that appropriate provision is made, usually by the imposition of
conditions, for the preservation or planting of trees. Such conditions can
be the subject of appeal or an application to vary the condition. Non-
compliance with any condition imposed can be the subject of
enforcement action. 
7.3 There are numerous Tree Preservation Orders in force at present within
the area of the Council. The Council’s Planning Service has a duty to
review existing tree preservation orders. A Tree Preservation Order
(TPO) may be made if it appears to the Council to be: 
 expedient in the interest of amenity and/or,
 that the trees, groups of trees or woodlands are of cultural or
historical significance. 
Owners, lessees, and occupiers of land affected by a proposed TPO
have the right to make objections prior to confirmation. 
7.4 Prior to the commencement of any works to trees protected by a Tree
Preservation Order application must be made to the Council. Where a
tree is not protected by TPO but is within a Conservation Area notice
must be given to the Council at least 6 weeks prior to the commencement
158

Page 159

Page 6 of 12 
of any work. Where protected trees have been removed the Council will
normally require the planting of replacements. 
7.5 The High Hedges (Scotland) Act 2013 is a stand-alone legislation and not
a direct responsibility of the planning authority, but in the North Ayrshire
Council area it is administered by Planning Services.  The Act relates to
any hedge which is (i) over 2 metres in height, (ii) formed by a row of two
or more trees or shrubs and (iii) forms a barrier to light.   
It allows any owner or occupier of a domestic property, who feels that the
height of a high hedge adversely affects their reasonable enjoyment of
their property, as a “last resort” to pay a fee and apply to the Council for a
High Hedge Notice to be issued requiring the owner of the hedge to
remedy the adverse effect, usually by reducing the height of the hedge. 
An appeal against the terms of the Notice can be made to the Scottish
Government by either the applicant or the owner.  The Act refers to all
trees whether otherwise protected or not and if a Notice is served then
the works must be carried out. 
The Scottish Government Guidance on the Act specifies that there are no
special procedures laid down for applications where the local authority is
directly involved, either as applicant or owner, and that these should be
processed as normal.  The guidance states “it is hoped that in such
cases, attempts made to resolve the problem amicably would result in a
solution before the applicant felt the need make a formal application”. 
8. Inspection of Trees 
8.1 Assessment of tree enquiries is currently undertaken in response to
service requests or complaints as and when required. It is not practicable
to formally inspect all trees where service requests or complaints are
received. As a general rule, site inspections will not be undertaken in
response to enquiries relating to nuisance value. In these instances,
advice will be provided to enquirers in line with this policy from the land
portfolio holder concerned. 
8.2 The minimum standards for managing the risk from trees, including risk
assessment by a competent person is outlined under Section 3 of the
Health and Safety at Work etc Act 1974. The Council has a duty and
responsibility for ensuring they have systems in place to control risks from
trees to members of the public in the community, their employees and to
contractors. 
8.3 A pro-active programme of inspection is being developed utilising a risk-
based approach to identify priority. The criteria utilised to establish priority
includes tree location in relation to roads, footpaths, built structures, high
or frequently used areas etc. Tree inspections are primarily concerned
with health and safety, identifying foreseeable risks and hazards
commonly associated with trees, rather than aesthetic or amenity value,
159

Page 160

Page 7 of 12 
although these can be considered. Inspection will consider the presence
of the following factors, including, but not restricted to:- 
 Tree canopy die-back
 Deadwood
 Fungal and/or fruiting body associations
 Root-plate heave
 Stem cavities or decay
 Included bark unions
 Previous branch failure points
 Tree canopy touching adjoining buildings, obscuring
signage/streetlights/CCTV
 Low branches or tree canopy obstruction over roads and footpaths
 Tree diseases 
9. Felling and Pruning of Trees 
9.1 Where inspection either re-active or planned identifies that a tree
constitutes a hazard or is unsafe action will be taken as soon as
practicably possible to minimise risks within a pre-determined time, by the
relevant portfolio / duty holders. Examples of circumstances that require
immediate action include:- 
 The tree is unstable, uprooted and is leaning in the direction of
property or areas of public access. The level of risk and the degree
of urgency required to address the problem will be dependent on
the target type (the public, vehicles, buildings, footpaths and roads,
as examples) and frequency of use, size of the tree, extent of root-
lift and current and forecasted weather conditions.
 The tree has hung up limbs that if were to become detached would
cause harm or damage to public or property.
 The tree is blocking a part of the Council’s roads network.
 The tree has fallen from council or adopted land and is blocking
access to property.
 The tree has fallen onto property or vehicles from council or
adopted land. 
9.2 Other than where a tree presents a hazard or forms part of a woodland
management plan there is a general presumption against the removal or
pruning of trees which are healthy, except for exceptional circumstances
where the Council’s Arboriculture Officer will advise. 
9.3 Where it has been decided that works are required to trees consideration
will be given to maintain the value and health of the tree. 
9.4 Consideration will be given to pruning. However, excessive pruning or
reducing a tree’s size can adversely affect the health, appearance and
amenity value of the tree, as well as resulting in weakly attached re-
growth. Examples of where pruning is appropriate include:- 
160

Page 161

Page 8 of 12 
 Minor works.
 To improve the growth and establishment of adjacent trees.
 To prevent or rectify direct or indirect physical damage to         
buildings, structures and public utilities where practical and
accessible.
 Formative pruning of any newly planted trees.
 To improve the health and condition of existing trees, e.g. crown
cleaning.
 As part of woodland or screen thinning operations. 
9.5 Felling/Removal will be considered, generally, but not restricted to the
following instances: 
 The tree is dead, dying or diseased and presents an unacceptable
degree of risk to persons or property.
 The tree is uprooted or wind-thrown and presents an unacceptable
degree of risk to persons or property.
 The tree is causing damage to buildings, structures or public
amenities.
 Regeneration of woodland (clear felling) and landscaped areas.
 To improve the growth and establishment of adjacent trees, e.g.
woodland thinning.
 To facilitate works by statutory undertakers. 
 Where pruning or alternative options are not practical.
 To control / limit / treat the spread of notifiable diseases. 
10. Subsidence and Drains 
10.1 Where trees are believed to be causing subsidence to a property,
including damage to drains, the claimant will be required to provide
supporting expert evidence, usually through their property insurers. All
enquiries and any subsequent claims will be passed to the Council’s
Finance and Risk Management Service. 
11. Trees, Overhanging Branches and Root Encroachments 
11.1 Under Common Law in Scotland there is no legal duty on the owner of a
tree to cut or prune trees within their land or property other than ensuring
the trees present no risk of damage to life or property. 
11.2 Trees, especially when growing near to property can cause concern to
people who live near or in close proximity to them. The size of a tree
alone is not reason enough to prune or fell a tree. Such measures could
adversely affect the amenity value of the site, over-expose adjacent trees
to prevailing wind or cause irreversible damage to the tree where pruning
has occurred. Accordingly, trees will not be pruned or felled unless they
present a safety issue or a hazard to the public or property. 
11.3 The Council will not undertake works to trees that overhang adjacent land
unless the tree or overhanging branches present a safety issue or part of
161

Page 162

Page 9 of 12 
the tree is in contact with any building or boundary within that land. Under
Common Law affected landowners can prune any overhanging growth
providing the cuts are made on their side of the boundary. The arisings
legally belong to the owner of the tree and should be offered back to them
unless they have given permission to keep or dispose of them. 
12. Light, TV and Satellite Reception, Views and General Nuisance. 
12.1 As a general rule the Council will not carry out tree pruning or removal
works on trees within council ownership or adopted land directly
attributable to: 
 Loss or interference with TV or satellite signal reception
 Restriction of sunlight or artificial lighting, unless adjudged to
excessive, in which case the Council’s Arboriculture Officer will
advise on this.
 Blocking or obstructing a view from a residence
 Medical ailments unless supported by expert medical opinion. The
Council reserves the right to challenge such opinion. 
12.2 As a general rule the Council will not carry out tree pruning or removal
works on trees within council ownership or adopted land in direct
response to, or relating to enquiries regarding natural or seasonal events,
for example: 
 Falling leaves
 Sap exudation (honeydew)
 Falling fruits/nuts
 Bird droppings
 Blossom
 Reduction or increased moisture within gardens
 Basal stem sucker growth
 Germinating seeds from trees
 Blockages or obstructions from tree deposits and leaves
 Presence of algae and/or build up of moss. 
12.3 Only when required, and when all other potential solutions have been
exhausted, will tree pruning or removal be considered. Examples of
potential alternative solutions include:- 
 Slippery road and path surfaces arising from leaf or fruit fall should
be reported to the Streetscene operations who will arrange for
those areas that are formally owned or adopted by the Council to
be swept. 
 Leaf and/or fruit fall within private gardens can be deposited within
the ‘brown’ garden waste bin collected by the Waste Management
service. The council are not responsible for the removal of leaf fall
from properties. 
162

Page 163

Page 10 of 12 
 Re-location or use of extension poles for aerials and satellite
receivers or contacting suppliers to discuss alternatives. 
12.4 Landowners are able to exercise their rights under common law in
respect of any over hanging branches or encroachments and will be
advised of these. 
13. Poisonous Trees 
13.1 Any works undertaken in respect of poisonous trees will be based on the
level of risk relating to each individual case. Factors for consideration will
include the level, nature and frequency of site usage, level of toxicity,
position of berries and seeds, etc on the tree and any alternative means
of addressing/managing the problem, such as regular uplift of fruit fall. 
14. Trees with Thorns 
14.1 Where trees bear thorns or spines that pose a hazard to the public, action
will be taken to remove the part of the tree most likely to cause harm.
Influencing factors on the action taken will include the level, nature and
frequency of site usage, the setting of the site, the effect of pruning on the
tree and, alternative means of managing the problem, e.g. replanting the
tree in a more suitable location. 
15. Wildlife/Insects 
15.1 Trees will not be pruned or felled to remove any animal protected under
the Wildlife and Countryside Act 1981 (as amended), other appropriate
Protected Species legislation, or to remove insects such as wasps, bees,
or midges. In the case of pests, advice can be sought from Protective
Services. 
15.2 Where birds are found to be nesting, tree work will be postponed until the
end of the nesting season, other than where there is an immediate risk to
safety. 
15.3 Where trees have been identified as a roosting site for bats, work will not
be carried out until an assessment has been undertaken by an
appropriately qualified practitioner or Scottish Natural Heritage, other than
where there is an immediate risk to safety. 
15.4 Where possible, safe to do so and in appropriate areas arboriculture
practices will be used to create wildlife habitats. This may include
practices such as:- 
 Retaining dead standing trees as natural habitats, preferring to
prune rather than fell. 
 Leave in situ and dead or felled trees in order to create wildlife
habitats when safe to do so.
163

Page 164

Page 11 of 12 
16. Public Utilities and Close Circuit Television (CCTV) and
streetlighting 
16.1 CCTV systems and streetlighting should be erected clear of any trees to
enable a clear view of the areas covered. Where subsequent tree growth
obscures all or part of public CCTV systems and street lighting
appropriate works will be undertaken by the premise/land portfolio holder
/ duty holder to maintain the original level of coverage. 
16.2 Where trees are in contact with or threaten public utilities appropriate
pruning, or where necessary removal, works will be undertaken after an
assessment of the site. In all cases works will seek to retain the value of
the tree. 
17. Vandalism and Antisocial Behaviour 
17.1 Where it is claimed that trees are contributing to antisocial behaviour or
crime the enquirer will be passed to the Police or the Council’s
Community Safety Team. Only in exceptional cases and where the
written support of either the Police or the Council’s Antisocial Behaviour
Investigation Team is provided will appropriate works be undertaken. 
17.2 Any work undertaken to a Council owned tree, unless it is overhanging or
encroaching upon a private property, and in accordance with Common
Law, will be considered as vandalism and will be reported to the Police as
a criminal act. Members of the public who witness acts of vandalism to
trees should report the matter directly to Police Scotland. 
18. Tree Planting 
18.1 The Council aims to create a wide, varied and sustainable tree stock.
New tree planting can create opportunities to increase age and species
diversity and improve the local landscape. To achieve this the Council or
in partnership with the community will endeavour to plant new and
replacement trees, where appropriate opportunity arises, to ensure
continuous tree cover, with priority being given to appropriate species.
Where trees are removed, we aim to replace them on a like for like basis.
However, if this is not possible or appropriate to do so, we will replace
with a suitable species at a suitable location. 
18.2 North Ayrshire’s 2030 Woodland Plan: A Tree Planting Strategy: By 2030,
the Council aims to plant 108,000 trees in recognition of the importance
of trees in carbon absorption as part of our overall approach to becoming
carbon net-zero by 2030. 
This will be delivered as part of a large-scale woodland tree planting
programme to provide the anticipated level of carbon sequestration
required to meet the net-zero ambition. 
164

Page 165

Page 12 of 12 
18.3 Before reaching a decision as to whether new or replacement tree(s) are
to be planted, the Council will consider the Tree Planting Strategy
objectives and take into account the following considerations: 
 Will the new or replacement tree/s be of public benefit?
 Is there sufficient room for a new tree(s) to grow and develop
without causing future problems?
 Is there a deficit of trees in the area?
 Was the removed tree part of a local feature or of historical
significance?
 What species is appropriate for the site?
 Sources of planting stock.
 Relevant legislation.
 The Council’s commitment to achieving net-zero carbon emissions
by 2030. 
All new tree planting will be carried out during the winter months. 
18.4 When planning a planting programme for open spaces within community
areas, local Elected Members and community groups will be consulted
wherever possible, with other council services being consulted where
appropriate. 
19. Review of Decisions 
19.1 Where anyone disagrees and wishes to contend with the decisions taken
in implementing this policy, North Ayrshire Council’s Complaints
Procedure should be used. 
20. Review of Policy 
The implementation of this policy will be monitored on an ongoing basis
and the policy will be reviewed September 2026. 
165

Page 166

166

Page 167

NORTH AYRSHIRE COUNCIL  
29 August 2023 
Cabinet 
Title: Memorial benches, plaques and other memorial
opportunities 
Purpose: To provide an overview and seek Cabinet approval of the
appropriate options to be supported for memorials for
members of the public to remember a loved one. 
Recommendation: That Cabinet approves the range of options in respect of
memorials. 
1. Executive Summary 
1.1 North Ayrshire Council has a longstanding history of providing memorial benches and
plaques to offer bereaved families an opportunity to remember their loved ones in a
lasting and meaningful way. Over time, the large accumulation of benches and plaques
together with challenges with suitable locations, maintenance and sensitivities
associated with the removal of floral tributes led to the ongoing temporary suspension
of the service and investigation of alternative approaches. 
1.2 Elected Members and enquiries from the public have indicated there is an appetite for
an enhanced and bespoke suite of memorial alternatives that could be offered to
bereaved families. The Streetscene Strategy Team has identified potential solutions
that could offer an enhanced service to meet these needs and requirements. 
2. Background 
2.1 North Ayrshire Council has a longstanding history of providing memorial benches and
plaques to offer bereaved families the opportunity to remember their loved ones in a
lasting and meaningful way. Over time, the large accumulation of benches and plaques,
challenges with suitable locations, maintenance, and sensitivities of removing tributes,
led to the temporary suspension of the service and the investigation of alternative
approaches. 
2.2 It is recognised and acknowledged that there is a desire of many members of the public
to remember loved ones with a memorial in the surroundings with which they were
familiar. These requests are agreed and accommodated wherever possible, but any
decision must recognise the needs of the wider public. The Council therefore requires to
ensure that the memorial process is managed and regulated for the mutual benefit of all.
This can also be to the benefit of the community if the memorial enhances or makes the
location more attractive by helping to maintain the character of the area. The principles to
be adopted will ensure that requests for memorials are responded to in a consistent
efficient and sympathetic manner.
Agenda Item 14
167

Page 168

Objectives 
2.3 The objectives of a memorial offer are to ensure that: 
• Unique remembrance spaces for local people are provided to celebrate and mark
the lives of loved ones;
• The memorial offer and service is clear and easily understood;
• The response to contrasting needs is balanced and appropriate;
• The use of public spaces is not compromised and ensure the quality of
attractiveness is maintained for the use of all residents and visitors;
• Any memorial is appropriate for the location in which it is placed;
• All memorials are cost-neutral and low maintenance for the Council;
• Costs of supply and installation are affordable and are covered by the applicant of
the memorial. 
Responsibilities 
2.4 The following responsibilities and requirements are proposed for the options. 
• The location and types of memorials for individuals will be agreed with applicants.
• Priority will be given to applicants that are resident In North Ayrshire or have a
direct connection with the area. Other applications will be considered on a case
by case basis;
• Memorials should have some community benefit either as street furniture or by
enhancing the appearance of the local area;
• The cost of supply and installation of any memorial will be covered by the
applicant and paid for prior to installation;
• The responsibility for the maintenance of any memorial is clearly defined and
communicated prior to installation;
• The Council will accept no responsibility if a memorial is damaged, vandalised or
stolen;
• In the event of damage by accident, vandalism or it becomes unsafe and beyond
economical repair, the Council reserves the right to remove and not replace the
memorial;
• Once installed the memorial can only be repositioned with the agreement of the
Council;
• Any plaques or wording must be a suitable size, colour and type face and agreed
with the Council in advance;
• Once installed the memorial will become the property of the Council and any
routine maintenance costs will be covered by the Council.
• Any plaques will remain the property of the applicant and must be maintained in
good condition;
• No additional structures or mementoes e.g. fencing, wreaths, flowers, can be
placed on or at the memorial at any time.
168

Page 169

Options 
Memorial Benches and Plaques 
2.5 The existing memorial option of procuring a memorial bench and/or attaching plaques
to benches is nearing saturation point and it is proving difficult to support the wishes of
individuals in specific locations such as Largs Promenade. 
2.6 To provide this service in the future, consideration must also be given to the length of
time a memorial stays in place and to consider potentially bringing assets back into
circulation after a period of time. 
2.7 Alternatively, the option to purchase a bench with a prefabricated memorial could
remain. However, the asset would be placed in a location identified by the Council and
agreed with the applicant, such as parks and open spaces rather that the already
congested coastal areas. 
2.8 North Ayrshire Council will be responsible for all installation work. If the bench is to be
placed on grass it will usually be fitted to a concrete base. Memorial plaques will
require to be made of brass, stainless steel or aluminium and will be a maximum
agreed size. Any inscription on plaques will require approval by the Council prior to
fitting. The engraved plaque will be fitted to the bench by the Council. 
2.9 It is proposed that this would be cost neutral to the Council with actual costs paid by
those requesting the bench and/or plaque. It should be acknowledged that the costs of a
memorial bench could be significant as the bench will be placed in a public space and
will need to be durable, hard wearing and be of a higher specification than a typical
bench used in someone’s garden. 
Living Memorial Tree 
2.10 Dedicating a tree provides a living, growing memorial to a loved one and a poignant
way of remembering them. 
2.11 The Woodland Trust offer this facility across the UK and can range from individual trees
to whole areas of woodland. It is proposed that North Ayrshire consider a similar
initiative and identify, and set aside, areas that will be suitable for this. 
2.12 This would not only provide a remembrance to a loved one but also contribute to the
global climate challenge. This would complement the Councils tree planting strategy
‘North Ayrshire’s 2030 Woodland’ with areas of woodland/open space be set aside
for memorial trees. 
2.13 To recognise Climate Change and the Cost of Living Crisis, and the work done by
the Council to reduce the impact of this, it is proposed that living memorial trees be
provided free of charge to residents. The only cost to residents would be the
purchase and installation of a plaque. This will be funded from the Tree Planting
Strategy Investment Fund budget until the budget is fully committed. 
169

Page 170

Metallic memorial trees 
2.14 Metallic memorial trees positioned in high amenity areas would offer a unique
opportunity to remember family members and loved ones. 
2.15 Metallic memorial trees are able to provide up to 640 memorials in one location,
creating a focal point for visitors and a single point of focus for families. The assets
could become an attraction to visitors, require little to no maintenance, have a reduced
impact on resources and would be cost-neutral. 
2.16 Officers have identified an opportunity to promote this as a memorial offering. Once
installed, the tree then has anodised gold-effect aluminium ‘leaves’, engraved with a
loved ones’ details, affixed securely to its branches over time. Leaves would be
attached by Streetscene maintenance operatives. Similar trees have been installed
successfully in other locations including across the UK and internationally. Example
images of the tree and the leaves are provided below. 
2.17 The tree is manufactured from laser cut steel, stands at 3.2m in height, and has 640
spaces for memorial leaves. The tree is fixed to the ground with a two-part concrete
foundation. The materials and manufacturing process are designed to withstand all
weather conditions including exposed locations. Having purchased a memorial leaf,
people can arrange the engraving of names, dates of birth and death with the possibility
of a personalised message on the reverse and return it to be attached to the memorial
tree. The tree memorial acts as a striking piece of public art, large enough that most
leaves remain out of reach but still providing legibility of the messages engraved. 
2.18 As with any public realm asset, the risks from anti-social behaviour must be considered.
If this is an offering that members are keen to promote, potential locations for this will
be discussed further with local ward members. The tree is exceptionally robust, and the
leaves themselves are securely fixed to the tree with pop rivets. 
2.19 It is estimated that the cost of implementing this initiative could be cost neutral over a 5-
7 year period. 
Memorial Rocks 
2.20 Memorial rocks and stones offer a simple natural way to remember loved ones. Rocks
can be placed on a beach or thrown into the sea, potentially being washed up for others
to find. They can be placed in a park or open space where loved ones enjoyed or
potentially into areas specifically created to house the memorials.
170

Page 171

Digital Remembrance 
2.21 Not all bereaved family and friends are local and may not be able to easily visit physical
memorials. 
2.22 A digital page of remembrance would offer people from all over the world the chance to
log in and view memorials at any time. 
Options from other organisations/charities 
Royal Society for the Protection of Birds (RSPB) 
2.23 The RSBP offer bereaved families the opportunity to remember their loved ones by
making a gift In Memory to the RSPB this will help protect birds and wildlife in the UK
and abroad, whilst continuing the memory of loved ones. 
National Trust for Scotland, Plant a Memory 
2.24 Plant a Memory helps bereaved families celebrate the life of their loved one whilst
remembering them in a special way. It also helps National Trust for Scotland to protect
the places that loved ones visited and explored, creating many fond memories. 
Approach from other Local Authorities 
2.25 Councils around the UK have implemented a varied memorial offer. Officers have
researched a number of offerings  via the Association of Public Sector Excellence
(APSE) and other desk research. The proposals contained within this paper align
with best practice across the UK. 
3. Proposals 
3.1 The existing memorial offer is nearing capacity in North Ayrshire. Throughout the
country, practical alternatives are being considered and implemented that offer a range
of affordable options with minimal resource implications to Councils. 
3.2 It is proposed that the North Ayrshire Council memorial offer provides a range of
affordable options to bereaved families and friends to assist them to celebrate a life and
remember a loved one. Choice and affordability will be key with responsibilities made
clear from the outset. It is proposed that North Ayrshire Council will limit prices to the
actual cost of each memorial selected with living trees provided free of charge.
Therefore, the Council will not generate any surplus from its memorial offer. 
3.3 It is proposed that Cabinet approves a balanced range of memorial options for
implementation including: 
• Benches and Plaques
• Living Memorial Trees
• Metallic Memorial Trees
• Memorial rocks
• Digital Remembrance  
171

Page 172

4. Implications/Socio-economic Duty
Financial
4.1 It is proposed that memorial offerings are cost neutral through full cost recovery with
no surplus incurred. The offer of living memorial trees free of charge will be met from the
Tree Planting Strategy Investment Fund.   
Human Resources 
4.2 This initiative will be delivered from existing resources from the Council’s
Streetscene service. 
Legal 
4.3 This proposal is fully aligned to the duty to promote Wellbeing and Best Value
contained in the Local Government (Scotland) Act 2003. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 In respect of the living memorial tree option this will contribute to the Council’s
declaration of a Climate Emergency and to help reach net zero. 
Key Priorities 
4.6 The proposal supports the Council Plan’s strategic priority on Climate Change
through the Living Tree memorial. The offer of no cost/low cost options also
supports the Council’s desire to reduce the impact of the Cost of Living Crisis. 
Community Wealth Building 
4.7 The proposals align to the Councils Community Wealth Strategy through the Land
and Assets pillar. 
5. Consultation 
5.1 Consultation took place with the Policy Advisory Panel on 2 February 2023 and each of
the six Locality Partnerships in March 2023. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Service (Neighbourhood
Services), on 01294 324570. 
Background Papers
0
172

Page 173

NORTH AYRSHIRE COUNCIL  
29th August 2023 
Cabinet
Title:
Proposals for Community Investment Fund (CIF)
Expenditure
Purpose: To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects. 
Recommendation: That Cabinet: 
a) Reviews the enclosed applications from the Arran, Three
Towns and Kilwinning Locality Partnerships in line with CIF
criteria;
b) Approves the CIF application in relation to Arran Geopark;
c) Approves the CIF application in relation to Saltcoats Active
Lifestyle Team (SALT) ; and
d) Approves the CIF application in relation to the Corra
Foundation. 
1. Executive Summary 
1.1 Within its budget for 2017-18, North Ayrshire Council provided a funding allocation for
the creation of an innovative fund to enable communities to address the priorities they
have identified though Locality Planning Partnerships and within the context of North
Ayrshire Community Planning Partnership’s Fair for All Strategy and the Council’s
Community Wealth Building Strategy. In June 2021, Cabinet approved a further £1m
top-up for the funding, with a further £2m added in November 2021. 
1.2 Locality Partnerships have subsequently continued to work on their local action plans
and are refining proposals for expenditure in line with their locally identified needs. This
is a difficult process, and it is a testament to the dedication of the Locality Partnerships
and their community partners that proposals are now emerging to provide creative
approaches to addressing local challenges. 
1.3 This report brings forward proposals which respond to the specific need of the local
community, and which have been developed based on local circumstances and
opportunities. 
1.4 These proposals have been approved to be submitted to Cabinet through a process of
collaboration and consensus by the Locality Partnerships. 
Agenda Item 15
173

Page 174

2. Background 
2.1  Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they have
identified though Locality Planning Partnerships and within the context of North Ayrshire
Community Planning Partnership’s Fair for All Strategy and the Council’s Community
Wealth Building Strategy. A further £3m was added to the funding in 2021, to be
distributed among Localities as follows: 
2.2 It was agreed that the CIF awards range between £5,000 and £100,000 for the
community organisations, as defined in the CIF guidance, in order to support proposals
and projects that connect with: 
• The North Ayrshire Fair for All Strategy, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and Locality priorities; 
• North Ayrshire Council’s values, priorities, and business objectives;
• The Community Wealth Building and Environmental Sustainability and Climate
Change Strategies; 
And will also:
• Fulfil a compelling need and not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of
people possible;
• Exhibit project and/or organisational innovation in their approaches to their work
in their way of addressing community challenges and in their request to Locality
Partnerships and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can
include an organisation to be created to deliver the project; 
Locality Value of CIF
from first
funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from
second
funding
allocation
(June
2021)
Value of CIF
from third
funding
allocation
(Nov
2021)
Total balance
available
Irvine £754 000 £558 435 £290 000 £580 000 £1 065 565
Kilwinning £286 000 £286 190 £120 000 £240 000 £359 810
Three
Towns
£598 000 £861 973  £240 000 £480 000 £456, 027
Garnock
Valley
£390 000 £341 805 £150 000 £300 000 £498 195
North
Coast
£468 000 £429 066 £170 000 £340 000 £548 934
Arran £104 000 £45 226 £30 000 £60 000 £148 774
TOTAL £2 600 000 £2 522 695 £1 000 000 £2 000 000 £3 077 305
174

Page 175

• Include options or potential for NAC and CPP employee engagement and
volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular
basis. 
2.3   The proposal development and application process has been agreed as follows: 
• Locality Partnerships should continue to engage with their communities and
stimulate interest in the CIF. Each Locality Partnership will then strategically
assess the applications, make links, and look at the funding ‘in the round.’
• If the partnership supports a bid then the group will be encouraged to submit a
full application form, which they will decide upon before making a proposal to
Cabinet for final approval. 
• The proposal will go to the next suitable Cabinet for final approval. 
2.4  The enclosed applications have been developed by community partners and North
Ayrshire Council officers and are now recommended for approval by Cabinet. The
proposals are as follows: 
2.5 The Arran Locality Partnership 
The allocations and funds committed to date are outlined in the table below. 
The Arran Locality Partnership CIF
allocation to date: 
£194,000
Arran Youth Foundation and Arran High
Joint Bid - Young People's Mental Health
£45,226 
Balance  £148,774 
2.6 Proposal: Arran Geopark (£79,853) (See Appendix 1) 
2.6.1 Arran Geopark are seeking funding to appoint a Project Director who will develop
and implement the Geopark’s management plan, which is aligned with the Local
Island plan. The aim within the two-year project period is to gain UNESCO Global
Geopark status for the whole of the Isle of Arran. 
There are two proposed stages with funding only being released when the milestone
is passed: 
• Stage 1 – submission and management of the UNESCO application process,
including desktop and field assessment. A milestone for the project will occur when
notification is received (late 2024) from UNESCO that the application is successful or
if a decision is deferred, requiring further information; 
• Stage 2 – responding to UNESCO’s recommendations, which will be given if the
application is successful or deferred. An “improvement report” will be submitted to
UNESCO if the application is deferred. 
2.6.2 If the application is unsuccessful at stage 1, the stage 2 funding will not be released.
Stage 1 funding amounts to £40,291 and stage 2 would be a further £39,562. 
2.6.3 UNESCO Global Geopark status would act as a catalyst to drive diverse benefits to
175

Page 176

the island’s community, environment, and economy with a particular focus on the
following groups: 
• Local people and visitors will benefit from an increased understanding and
appreciation of the island's heritage.
• Visitors from new geographical areas and backgrounds will be enticed to visit by the
increased visibility provided by the UNESCO designation.
• Local businesses will benefit as a result of the global platform afforded by the
UNESCO designation. This will be true for local service providers as well as
producers/exporters.
• Young people (e.g. from local and visiting schools) will benefit through the Geopark’s
outreach programme and educational resources. 
2.6.4 The project would particularly support the locality priority of reducing social isolation
by providing residents with a deeper sense of belonging and pride in their island
and its heritage, and offering volunteering opportunities, as well as providing young 
people in particular with enhanced knowledge of their local environment. It would 
also support community wealth building aspirations by encouraging visitors to the 
island and increasing the potential for local businesses to generate income. 
2.7 The Three Towns Locality Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Three Towns Locality Partnership CIF
allocation to date: 
£1,318,000
Ardrossan Community Development Trust   £25,000 
Three Towns Growers £100,000 
The Training Station £50,000 
Ardrossan Castle Heritage Society £17,912 
Raise Your Voice For Ardeer   £100,000 
Ardrossan Community Sports Hub   £43,320 
Winton Circus Playpark   £48,288 
Ardrossan Community Development Trust -
Development Officer   £53,100 
Raise Your Voice For Ardeer – increased cost
for multipurpose hub) £130,000 
Ardrossan Community Association (Whitlees)  £48,586 
Ardrossan Community Sport - Winton Park 3G £100,000 
CHAP – Advice Outreach 
£45,767 
Ardrossan Scouts  £100,000 
Balance £456, 027 
2.8 Proposal: Saltcoats Active Lifestyle Group (SALT) (£45,600) (see Appendix 2) 
2.8.1 SALT is a constituted voluntary community organisation which was
established in August 2021.Their aims and objectives are to advance
the emotional and physical wellbeing of the inhabitants of Saltcoats
176

Page 177

through the provision and regeneration of such facilities which enable
this. 
2.8.2 They have recently successfully completed the upgrade and
regeneration of the local playpark and secured the total funding
package of over £100,000. This has led to a safe space for the
provision and development of play for the children and young people
of the town. 
2.8.3 SALT are looking to install CCTV adjacent to the playpark to safeguard
the facilities and create a safe space where children, young people
and adults come together to enjoy the playpark. Recent survey
analysis has concluded that the installation of CCTV would create a
greater sense of community safety and lead to increased use of the
park. The project will be delivered in partnership with NAC and the
SALT group. Once the camera is in place NAC will add this to their
existing network and monitor the area.  The SALT CCTV has been
able to be included in the Council’s system on this occasion only due
to the availability of a licence which was freed up from another site. 
2.8.4 The project supports the delivery of the 3 Towns locality partnership
priorities, promoting the local economy and tourism and regenerating
community facilities by providing a safe and attractive play area,
increasing civic pride and community engagement by reducing anti-
social behavior and improving community wellbeing by helping
residents feel safer and encouraging children and families to be active
outdoors. 
2.9 Kilwinning Locality Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Kilwinning Locality Partnership CIF
allocation to date: 
£646 000
Kilwinning McGavin Park  £35 000
Multi-Purpose Youth and Community Hub  £41 190
Multi-Purpose Youth and Community Hub –
Phase 2 £15,000 
Kilwinning McGavin Park – Phase 3  £45,000
Almswell Park Pitch replacement  £45,000
Corsehill Playpark  £50,000
Kilwinning Tennis Club £55,000
Balance  £359,810 
2.10 Proposal: The Corra Foundation (£36,000) (see Appendix 3) 
2.10.1. Corra Foundation exists to make a difference to the lives of people and communities.
It works with others to encourage positive change, opportunity, fairness, and growth
of aspirations which improve quality of life. Corra wants to see a society in which
people create positive change and enjoy fulfilling lives.
177

Page 178

2.10.2. Since 2016 Corra and North Ayrshire Council have been working in partnership
alongside the community of Blacklands.  This long-term work has supported strong
connections to be built and established a firm foundation of increased confidence,
capacity, and community-led action. This partnership has been underpinned by a
simple pledge designed to support, what was then, a new way of working alongside
communities.   
2.10.3 Corra plan to build their ongoing work in Blacklands around three key elements: 
• Priorities – we know that communities’ priorities are changing and can offer a
supportive space to explore, define and articulate them.
• Plans – supporting communities to set out their priorities and actions to achieve them
in a ‘community-owned’ plan.
• Partnerships – connecting with partners who can help to produce the plan and/or
help deliver on community priorities. 
2.10.4 Corra see their role within North Ayrshire as integral to supporting community
members in Blacklands to be aware of the Locality Plan, engage in the structures and
processes and help shape the evolution of the plan and priorities to recognise community
need. This will involve supporting community members to develop confidence and
capacity to deliver and lead on activity that directly contributes to the priorities identified. 
2.10.5 The requested funding would contribute to the overall running costs of the People in
Place project over the next three years and see a strengthening of the relationship that
already exists between Corra, North Ayrshire Council and the Kilwinning Locality
Partnership. 
2.10.6 Getting Alongside Communities will directly contribute to the Kilwinning Locality
Priorities of supporting skills and work, alleviating poverty and promoting equality of
access to opportunities, improving community wellbeing, and building strong
communities. As community confidence and capacity to grow in terms of participating in
locality planning structures and providing their ideas, there is also potential to make a
more significant contribution to the priority of ‘Improving our local environment’ which has
been a feature of some smaller scale local action to date. 
3. Proposals 
That Cabinet: 
a) Reviews the enclosed applications from the Three Towns and Kilwinning Locality
Partnerships in line with CIF criteria;
b) Approves the CIF application in relation to Saltcoats Active Lifestyle Team (SALT) ;
and
c) Approves the CIF application in relation to the Corra Foundation. 
178

Page 179

4. Implications/Socio-economic Duty
Financial
4.1 CIF funding is allocated within existing resources. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community
cohesion and advance community empowerment. Each of the CIF proposals is tested
against that purpose before being presented to Cabinet. 
Climate Change and Carbon 
4.5 Environmental and sustainability along with Climate Change and Carbon issues are
considered in relation to each CIF application. 
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
priorities:
• Active and strong communities
• Inclusive, growing, and enterprising local economy
• People enjoy good life-long health and wellbeing.   
Community Wealth Building 
4.7 The applications support the following pillars of community wealth building:
• Advancing community enterprises;
• Advancing local ownership of underused land and buildings;
• Making financial power work for local places; and 
• Supporting local business activities and increasing the variety of ownership
models. 
5 Consultation 
5.1  The proposals contained within this report have been developed by the Locality  
Partnerships, through consultation with local people, including young people. 
179

Page 180

Audrey Sutton
Executive Director (Communities & Education)
For further information please contact Rhonda Leith,  Head of Service (Connected
Communities), on (01294) 324415. 
Background Papers
Appendix 1: CIF Application: Arran Geopark
Appendix 2: CIF Application: Saltcoats Active Lifestyle Group (SALT)
Appendix 3: CIF Application: The Corra Foundation 
180

Page 181

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
The CIF will support proposals and projects that:
• Connect with:
o The North Ayrshire Fair for All Inequalities Strategy;
o the Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis.
When to apply and how?
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible:
Anne-Marie Hunter
Engagement and Participation Officer
North Ayrshire Council
Connected Communities
2nd Floor (West)
Cunninghame House
Irvine
KA12 8EE
Email: Anne-MarieHunter@north-ayrshire.gov.uk
Tel: 01294 324706
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf
Appendix 1
181

Page 182

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP 
1. Details of your organisation 
Name of Organisation 
Arran Geopark 
Postal Address for Correspondence
Click or tap here to enter text. 
Name of Contact Person Malcolm Wilkinson 
Position in Organisation Coordinator 
Telephone Number Click or tap here to enter text. 
Email Address Click or tap here to enter text. 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence. 
Arran Geopark is managed by the Arran Access Trust (charity no. SC029027) and
the project has been in existence since 2017. We are in the process of forming a
separate SCIO. 
Arran Geopark’s vision is that “our environment and heritage are conserved,
enhanced, and valued for their contribution to people’s well-being and Arran’s
sustainability”. We aim to achieve this by: 
• Increasing understanding and appreciation of our remarkable environment and
heritage to local people and to visitors.
• Supporting sustainable local economic development through education,
interpretation, practical conservation work, and nature-based tourism.
• Collaborating with communities, businesses, and other local stakeholders who
share our vision.
• Provide opportunities for all to contribute to enhancing Arran’s environment
through a programme of volunteering, thereby increasing participants mental and
physical wellbeing. 
We see the UNESCO status as a catalyst to drive diverse benefits to our island’s
community, environment, and economy. 
182

Page 183

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for. 
Please include: 
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
We are seeking funding to appoint a Project Director who will develop and implement
the Geopark’s management plan, which is aligned with the Local Island plan. The
aim within the two-year project period is to gain UNESCO Global Geopark status for
the whole of the Isle of Arran. There are two proposed stages with funding only being
released when the milestone is passed: 
• Stage 1 – submission and management of the UNESCO application process,
including desktop and field assessment; 
o Milestone - notification is received (late 2024) from UNESCO that are
application is successful or if a decision is deferred, requiring further
information; 
o If application is rejected, Stage 2 funding will not be released. 
• Stage 2 – responding to UNESCO’s recommendations, which will be given if
the application is successful or deferred. An “improvement report” will be
submitted to UNESCO if the application is deferred. 
Where it will be held / delivered? 
The project, and the boundary of the proposed UNESCO Global Geopark, will cover
the entire area of the Isle of Arran (inclusive of Holy Isle and Pladda). This is an area
of almost 800 square kilometres and it includes the entirety of the South Arran
Marine Protected Area and No Take Zone. 
Who is your target audience? 
Our target audience is both local people and visitors to the island. 
Who will benefit from it and how?
183

Page 184

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP 
Gaining UNESCO Global Geopark status will act as a catalyst to drive diverse
benefits to our island’s community, environment, and economy – with a particular
focus on the following groups: 
• Local people and visitors will benefit from an increased understanding and
appreciation of the island's heritage.
• Visitors from new geographical areas and backgrounds will be enticed to visit
by the increased visibility provided by the UNESCO designation.
• Local businesses will benefit as a result of the global platform afforded by the
UNESCO designation. This will be true for local service providers as well as
producers/exporters.
• Young people (e.g. from local and visiting schools) will benefit through the
Geopark’s outreach programme and educational resources. 
Project partners 
Arran Geopark’s growing board is comprised of representatives of the following
organisations: 
• Arran Access Trust;
• Arran Community Council;
• Community of Arran Seabed Trust (COAST);
• Lochranza Centre CIC;
• National Trust for Scotland;
• VisitArran; and
• Community representatives. 
We have received or continue to receive funding from the following organisations,
who we work closely with: 
• Arran Trust;
• NatureScot; and
• North Ayrshire Council. 
184

Page 185

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
4. What difference will this project make within the locality and to local
services and programmes? 
Please include: 
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with Communities, Economy and Environment. 
We are seeking funding to appoint a Project Director who will implement the
Geopark’s management plan, which is aligned with the Local Island plan, and aims
to gain UNESCO Global Geopark status for the island. 
The Geopark’s work, over this crucial two-year period, will tackle the following Island
Plan themes: 
● Community:
o Opportunities for practical conservation work;
o Increased mental and physical health through volunteering and outdoor
activities;
o Increased understanding & appreciation of natural heritage, amongst
residents young and old;
o Inclusion: reach out to more vulnerable groups to engage them in their
local environment; and
o Provide a forum for local representatives from land managers, tourism,
community groups and economic groups to discuss issues relating to the
environment and develop island-wide solutions to visitor management and
mitigate impacts. 
● Environment:
o Education and awareness of our natural environment and the human
impacts on it;
o Engage with the island community to develop local solutions for climate
change mitigation and adaptation;
o Support and monitor local efforts towards the Sustainable Development
Goals;
o Enhance the local environment through conservation programmes aimed
at increasing biodiversity and reducing the impact of visitors on our
landscape; and
o Develop partnerships with Universities and Colleges to encourage the use
of our island resource for research and furthering our understanding of the
island and its environment. 
185

Page 186

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
● Economy:
o Gain international exposure, benefiting local businesses both through
tourism and increased exports; and
o Work with partners to develop a sustainable tourism strategy and to
provide opportunities to increase visitor stay duration and spend. 
Longer term sustainability is at the core of the proposal. We will seek new and
innovative funding streams to ensure the Geopark can continue to operate
indefinitely; such as commercial sponsorship, memberships and supporter fees. We
will also lobby with partners across Scotland to secure Scottish Government core
funding for the nation’s UNESCO sites. 
The success of the project will be measured and reported using a range of specific
and measurable goals – these are outlined in Question 8, below. 
How does proposal seek to reduce island inequalities? 
● Inclusion of a wide spectrum of groups through education and practical activities;
● Outreach to all ages enabling them to participate in volunteering and/or
educational experiences; and
● Development of a Geopark Community Liaison Group where all aspects of the
island’s society is represented and where solutions to issues can be developed. 
186

Page 187

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
Due to the partnership structure of the Geopark, where representatives of various
local community groups sit on the board, community consultation has been an
intrinsic part of the organisation since it was formed in 2017. 
In addition to the membership of the board, project staff and board members have
engaged with the following groups and representative of these groups: 
● Archaeology Scotland
● Arran Community Council
● Arran Distillers
● Arran Eco Savvy
● Arran Estates
● Arran Farmers’ Show
● Arran Heritage Museum
● Arran Natural History Society
● Arran Trust
● Community of Arran Seabed Trust (COAST)
● Dougarie Estate
● Drumadoon Estate
● European Geoparks Network
● Forestry and Land Scotland
● Foundation Scotland
● Local outdoor activity providers
● NAC Islands Plan Working Group
● National Trust for Scotland
● NatureScot
● North Ayrshire Council
● Scottish Geology Trust
● Taste of Arran
● UK Geoparks Network
● UNESCO
● VisitArran
● VisitScotland  
187

Page 188

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
6. How will the project be managed? 
Please include: 
• How the finances will be managed 
• Does the proposed project contribute to volunteering or employment
opportunities on Arran? Please include the number of volunteering
opportunities and employment opportunities
• If there are any staff requirements, please outline your HR plans 
The following chart shows the proposed management structure of Arran Geopark
and where the Project Director role fits in (circled in red): 
How the finances will be managed? 
Finances will be managed by the Geopark’s treasurer in close cooperation with other
board members and project staff. Two signatories will be required to make
withdrawals from the account. We have included fees for a bookkeeper to reduce
staff admin time and to ensure that the charity is meeting its regulatory requirements.
188

Page 189

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP 
Does the proposed project contribute to volunteering or employment opportunities on
Arran? 
Volunteering opportunities are integral to the Geopark’s management structure and
operations and are split between three distinct areas: 
• Community Liaison Group,
• Working Groups, and
• Practical outdoor work meets. 
A Community Liaison Group is to be formed to inform the Geoparks overall strategy
and delivery. This is an open invitation for local people to get involved and ensure
that they have a strong voice in the overall vision of Arran Geopark. This is
particularly important as all Geoparks are “grass roots” community-led organisations. 
Working Groups are to be formed in order to serve particular functions of the
Geopark (see organisation chart, above). There groups are to be formed largely of
volunteers and to be managed by Geopark staff. 
Practical outdoor work meets have been in action for several years now. These
popular activities have involved path maintenance, beach cleans, non-native species
work and installing/maintaining footpath and information boards. 
Providing employment opportunities is also a key part of the Geopark’s work. The
key aim of Geoparks is to encourage sustainable economic growth while protecting
and conserving natural heritage. Indeed, the motto of UNESCO Global Geoparks is
"Celebrating Earth Heritage, Sustaining Local Communities". 
Encouraging new high growth markets (identified by VisitScotland) of “localism”,
“authentic experiences”, and “voluntourism” are key to the Geopark’s vision of a
diverse island economy. 
Since its inception in 2017, Arran Geopark has employed a variety of staff including
rangers, educators, a path maintenance team, and apprenticeship scheme. Our
NatureScot funded Ranger Service is now in its third year of operation. We look
forward to continuing this work. 
Outline of HR plans 
To ensure the best candidate is recruited for the post, it will be advertised locally and
nationally (e.g. Arran Banner, Countryside Jobs Service, EnvironmentJob.co.uk, etc). 
189

Page 190

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
Arran Geopark has equality and equal opportunities policies, available on request. 
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) 79,853 
Please give a breakdown of cost and recent quotations where appropriate. 
Costs Stage 1 Stage 2 TOTAL
Salary @ 0.8 FTE  £        24,000   £        24,960  
Pension & NICs  £          2,816   £          2,928  
Office & utilities  £          5,000   £          5,200  
Conference fees, travel &
accommodation  £          1,750   £          1,820  
UNESCO assessment (assessors'
travel, accommodation & expenses)  £          3,500   £                -    
European Geoparks Network
membership annual fee (€1,500)  £                -     £          1,300  
Other travel & expenses  £             450   £             468  
Bookkeeping & charity administration  £          1,250   £          1,300  
Insurance  £             875   £             910  
Training & development  £             350   £             364  
Website  £             300   £             312  
TOTALS  £        40,291   £        39,562   £        79,853 
The following table lists the total funds (both restricted and unrestricted) received by
the Arran Access Trust over the last 5 years: 
Year Total funds Funding source (only funders >£1k listed)
2017  £   78,335.00  Coastal Communities Fund
2018  £ 117,688.00  Coastal Communities Fund, NatureScot
2019  £ 143,824.00  Coastal Communities Fund, NatureScot, Arran Trust, Betty and Roy Ure Trust
2020  £   36,809.00  Coastal Communities Fund, Betty and Roy Ure Trust
2021  £   25,173.00  NatureScot, Betty and Roy Ure Trust, Betty and Roy Ure Trust
2022  £   19,565.00  NatureScot, North Ayrshire Council, Arran Trust, Betty and Roy Ure Trust
2023  TBC  NatureScot, North Ayrshire Council, Betty and Roy Ure Trust
190

Page 191

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP 
We have recently received project funding from NatureScot for two seasonal Island
Rangers (£25,428) and Heritage and Culture funding from NAC (£40,000). We have
no outstanding grant applications with other funding bodies. 
191

Page 192

COMMUNITY INVESTMENT FUND
ARRAN LOCALITY PARTNERSHIP
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
The project will be managed by the Project Director who reports to the Arran
Geopark board. This will be done at project meetings, board meetings and by weekly
email updates. Project spend and projected spending will be included in the weekly
reports. A summary of the above will be provided to the Locality Partnership, in time
for its scheduled meetings. 
The success of the project will be measured and reported using the following
outcomes: 
● Gaining UNESCO Global Geopark status (staged approach to funding);
● Securing long-term funding;
● Number of business partners sign-ups;
● Number of volunteer hours logged;
● Number of inclusion groups engaged with;
● Number of participants in education/outreach activties;
● Number of school groups visiting Arran;
● Number of university groups visiting Arran;
● Social media reach; 
Longer term indicators in the success of UNESCO Global Geopark status are likely
to be:
● Increase in the average stay time of visitors; and
● Increase in the average spend of visitors. 
192

Page 193

COMMUNITY INVESTMENT FUND
****  LOCALITY PARTNERSHIP
The CIF will support proposals and projects that:
• The North Ayrshire Fair for All Strategy, with consideration for how applications
contribute to community support for the cost-of-living crisis.
• The Community Planning Partnership and Locality priorities.
• North Ayrshire Council’s values, priorities, and business objectives.
• The Community Wealth Building and Environmental Sustainability and Climate
Change Strategies.
And will also:
• Fulfil a compelling need and not duplicate existing services or facilities.
• Provide long-term, sustainable, positive results for the greatest number of people
possible.
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council.
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project.
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis.
When to apply and how?
• LPs should continue to engage with their communities and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible:
Name Colin Ferris
Locality Officer (Three Towns Locality)
North Ayrshire Council
St John’s Primary School
Morrison Avenue
Stevenston
KA20 4HH
Email: colinferris@north-ayrshire.gov.uk
Tel: 475912/212
Mob: 0758461250
Appendix 2
193

Page 194

COMMUNITY INVESTMENT FUND 
****  LOCALITY PARTNERSHIP 
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf 
1. Details of your organisation 
Name of Organisation 
Saltcoats Active Lifestyles Team (SALT 
Postal Address for Correspondence 
Position in Organisation 
Donna McGregor Chairperson 
Telephone Number Click or tap here to enter text. 
Email Address 
2. Brief description of your organisation 
SALT is a constituted voluntary community organisation which was established in
August 2021. 
Our aims and objectives are to advance the emotional and physical wellbeing of the
inhabitants of Saltcoats through the provision and regeneration of such facilities
which enable this. 
We have recently successfully completed the upgrade and regeneration of the local
playpark and secured the total funding package of over £100,000. This has led to a
safe space for the provision and development of play for the children and young
people of the town. 
194

Page 195

COMMUNITY INVESTMENT FUND 
****  LOCALITY PARTNERSHIP
3. Title and summary of proposal 
We are looking to install CCTV adjacent to the playpark to safeguard the facilities
and create a safe space where children, young people and adults come together to
enjoy the playpark.   
Our recent survey analysis has concluded that the installation of CCTV would create
a greater sense of community safety and lead to increased use of the park. 
The project will be delivered in partnership with NAC and the SALT group. Once the
camera is in place NAC will add this to their existing network and monitor the area. 
.
4. What difference will this project make within the locality and to local
services and programmes? 
The installation of a CCTV camera adjacent to the park will have the following
benefits: 
• Reduction in crime i.e vandalism and anti-social behaviour
• Protect and safeguard community assets which would otherwise be expensive
to repair/replace.
• Greater use of the playpark as sense of community safety increases
• NAC are a key partner in the delivery of this project. 
The 3 Towns locality partnership priorities which will be met are as follows: 
• Promoting the local economy and tourism
• Regenerating Community Facilities
• Increasing civic pride and community engagement
• Improving community wellbeing 
The successful development of the playpark has had a positive impact on all of the
above and this will be further enhanced with the addition of CCTV. 
195

Page 196

COMMUNITY INVESTMENT FUND 
****  LOCALITY PARTNERSHIP
5. What engagement has taken place in relation to the project? 
We have success delivered a community consultation event at Winton Circus
playpark with 600 residents. There was overwhelming support for our CCTV initiative
with almost no negative responses. 
In addition, online surveys with local residents have also been carried out which
further support the need for CCTV. 
6. How will the project be managed 
The finances for the project will be managed by our voluntary management
committee. Our financial procedures ensure the efficient and safe management of
funds. 
Whilst this project does not directly create any specific paid employment
opportunities there is the opportunity to volunteer and join the voluntary management
committee and get involved in future projects. 
There is also the opportunity for local young people and children’s organisation who
are more likely to use the facilities as their concerns around safety will be somewhat
be alleviated with the installation of CCTV. 
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
To date in excess of £100,000 has been secured for the successful development of
the playpark. 
Amount of funding requested (£)  - £45,600 
These are the costs to purchase and install a CCTV camera adjacent to the playpark
provided by Graham Emans (Co-ordinator Homeless and Community Safety) 
196

Page 197

COMMUNITY INVESTMENT FUND 
****  LOCALITY PARTNERSHIP
8. Monitoring and evaluation process 
Monitoring will be carried out by NAC as the new CCTV camera will be added to
their existing network and be monitored directly by trained staff who understand the
legislative and legal requirements around the use of CCTV 
The data from crime stats will provide evidence on the impact of the camera and its
success. 
The SALT group will carry out further community consultation after the installation of
the camera to look at the impact of the camera on user numbers of the parky and the
sense of security and safety which has resulted. 
197

Page 198

COMMUNITY INVESTMENT FUND
KILWINNING LOCALITY PARTNERSHIP
The CIF will support proposals and projects that:
• Connect with:
o The North Ayrshire Fair for All Inequalities Strategy;
o the Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis.
When to apply and how?
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible:
Louise Riddex
Locality Officer (Kilwinning & North Coast)
Economy and Communities
Community Development Team
St John's Primary School
Morrison Avenue
Stevenston
KA20 4HH
Email: lriddex@north-ayrshire.gov.uk
Tel: 01294475913
Mob: 07980964858
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf
Appendix 3
198

Page 199

COMMUNITY INVESTMENT FUND
KILWINNING LOCALITY PARTNERSHIP
1. Details of your organisation
Name of Organisation
Corra Foundation
Postal Address for Correspondence 
Name of Contact Person: Gordon McLean
Position in Organisation: National Programme Manager
Telephone Number:  
Email Address:
2. Brief description of your organisation
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence.
Corra Foundation is a charity registered in Scotland (No SC009481) and is also a
company limited by guarantee (No SC096068). The organisation was previously
known as Lloyd’s TSB Foundation for Scotland from 1985 until it rebranded as Corra
in 2018.
Corra Foundation exists to make a difference to the lives of people and communities.
It works with others to encourage positive change, opportunity, fairness and growth
of aspirations which improve quality of life. Corra wants to see a society in which
people create positive change and enjoy fulfilling lives.
Corra achieves this through grantmaking and its place-based programme of which
Getting Alongside Communities is a key part.
In 2020 Corra launched a ten-year strategy. It is long term because making a
different on the big challenges will take time. At its heart is the strong belief that
when people find their voice, they unlock the power to make change happen.
www.corra.scot
199

Page 200

COMMUNITY INVESTMENT FUND 
KILWINNING LOCALITY PARTNERSHIP
About Getting Alongside Communities 
Established in 2015, as part of Corra’s People in Place programme, Getting
Alongside Communities is currently working alongside eight communities across
seven Scottish local authority areas, supporting local people to connect, collaborate
on ideas, and take action to create positive change. 
The community is at the heart of everything we do.  Each community we work
alongside has a dedicated Community Co-ordinator whose long-term relational
approach - based on listening, bringing people together for conversations, and
helping to identify shared priorities – has established deep knowledge, trust and
connections with local people and partners. 
The approach is designed to help facilitate and enable capacity building within the
community; widening community participation, seeking out voices that are seldom
heard; and ultimately resulting in locally-led actions being taken. 
The ambition for each community is set by the people in that place. Corra’s
commitment is to help create the conditions and connections needed for bold change
to happen. 
3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for. 
Please include: 
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
Getting Alongside Communities: Blacklands 
The proposal is for a partnership funding contribution towards the continued delivery
of the Getting Alongside Communities programme in Blacklands for a three-year
period between 2023 and 2026.   
The work builds upon the community capacity that has been developed since Corra’s
partnership with North Ayrshire Council began in 2016, and will focus on increasing
200

Page 201

COMMUNITY INVESTMENT FUND 
KILWINNING LOCALITY PARTNERSHIP
the sustainability of community initiatives through the development of local capacity,
infrastructure and connections with wider structures, including Locality Planning. 
Since 2016 People in Place has invested £235k directly into the work alongside
Blacklands. In addition, Corra’s local knowledge and trusting relationships have
connected local groups with other funding sources, including £46k to support
pandemic response work. 
During that time the programme has:
• Supported 13 community ideas into action 
• Engaged over 538 people 
• Benefitted from 587 hours of volunteering 
• Partnered with Council colleagues to support community and strategic
development
• Created opportunities for communites and colleagues to share learning, ideas
and amplify community voices at a national level. 
Some notable areas of activity include:
Increased Participation & Decision Making:  connecting with existing groups,
supporting new community activity and strategic developments - including
participatory budgeting through - Blacklands Community Kitty.
System Changers:  co-designed programme to explore systems and design thinking
– and how this knowlegde can be applied to support positive change in Kilwinning.
Community spaces: supporting community use of and investment in local facilities.
Tackling poverty and stigma:  including dignified food provision and clothing initiative. 
Partners that the Community Co-ordinator regularly works with include: 
North Ayrshire Council and HSCP, NHS Ayrshire, KA Leisure, Blacklands
Community Association, Kilwinning Community Football Academy, Blacklands
Primary School. 
The Community Co-ordinator has developed strong relationships with community
members and local partners and has been supporting and facilitating conversations
and responses to alleviating poverty, ensuring equality of access and improving
wellbeing. 
Integral to this approach is enabling individuals, groups and organisations to identify
and develop ideas – building confidence and capacity, which in turn results in
empowerment and a stronger and more sustainable community. 
201

Page 202

COMMUNITY INVESTMENT FUND 
KILWINNING LOCALITY PARTNERSHIP
In addition to directly working alongside Blacklands, Corra has supported the
development and delivery of a System Changers project for Kilwinning and will
continue to facilitate this work over the next two years. 
The ‘system changers’ are a mix of public and third sector staff and community
members. They have developed a deep understanding of systems change and are
exploring ways to put this theory into practice in Kilwinning. 
The group has identified metal health and wellbeing as a particular focus and are
developing experiments to test how best to meet need and improve outcomes. An
example of this is the coffee, cake and chat sessions, which libraries across North
Ayrshire are currently looking to establish following the positive impact – including
improved wellbeing and reduced in isolation - of pilot sessions in Kilwinning Library. 
The overall budget will include an annual ‘Ideas into Action’ allocation of £7,500 to
support community members and groups to test ideas and develop them. This
provides experience of managing funds and evidencing impact, which builds
confidence and the capacity to access larger sums of funding available through third
sector funding programmes in the future. 
4. What difference will this project make within the locality and to local
services and programmes? 
Please include: 
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Supporting
skills and work 2. Improving our local environment 3. Alleviating Poverty and
promoting equality of access to opportunities 4. Improving Community
Wellbeing. 
Since 2016 Corra and North Ayrshire Council have been working in partnership
alongside the community of Blacklands.  This long-term work has supported strong
connections to be built and established a firm foundation of increased confidence,
capacity and community-led action. This partnership has been underpinned by a
simple pledge designed to support, what was then, a new way of working alongside
communities.  Six years into the work, it feels timely and important to review and
deepen that collaboration. 
Collective investment from partners, with a shared interest in learning from and
resourcing communities to tackle deep-rooted social challenges, has always been at
202

Page 203

COMMUNITY INVESTMENT FUND 
KILWINNING LOCALITY PARTNERSHIP
the heart of the People in Place programme.  This approach is now vital, if we are to
move beyond immediate financial pressures and achieve lasting change. 
Communities are facing a critical moment of transition as they emerge from the
pandemic and begin to grapple with the rising cost of living.  We are seeing and
hearing, in addition to difficult issues, new priorities emerging and an urgency to act. 
This proposal sets out how partner funding from North Ayrshire Council can support
a deeper collaboration with Corra and communities that can deliver new ways of
working. 
Through recent discussions we know that there are a shared ambitions - between
communities, Corra and North Ayrshire Council - including in relation to the wellbeing
economy, increasing community participation and how long-term funding models can
support strategic partnerships and key community organisations.   
To help achieve these ambitions, Corra will build our work around three key
elements: 
• Priorities – we know that communities’ priorities are changing and can offer a
supportive space to explore, define and articulate them.
• Plans – supporting communities to set out their priorities and actions to
achieve them in a ‘community-owned’ plan.
• Partnerships – connecting with partners who can help to produce the plan
and/or help deliver on community priorities. 
These ‘three P’s’, and the evolution of approach they support, build on the strong
foundations – of trust, relationships, skills and knowledge - that have been
established to date and will continue to be instrumental in the work. 
This approach will help North Ayrshire Council and communities deliver key
outcomes including: 
• An enhanced understanding of new and emerging community priorities.
• Communities taking action to achieve these priorities contributing to lasting
change.
• Improved connections between local action and strategic priorities.
• Leading examples - including in relation to the wellbeing economy and public
service transformation - for other Local Authorities to follow.
• Enabling structures that support increased community capacity, local
leadership, genuine sharing of decision-making and power.
• Financial and social returns on investment. 
203

Page 204

COMMUNITY INVESTMENT FUND 
KILWINNING LOCALITY PARTNERSHIP
Corra has a strong understanding of the Locality Plan and governance structures for
Kilwinning.  We see our role within North Ayrshire as integral to supporting
community members in Blacklands to be aware of the Locality Plan, engage in the
structures and processes and help shape the evolution of the plan and priorities to
recognise community need. This will involve supporting community members to
develop confidence and capacity to deliver and lead on activity that directly
contributes to the priorities identified. 
Getting Alongside Communities will directly contribute to the following Localotu
Partnership priorities: 
• Supporting skills and work 
• Alleviating Poverty and promoting equality of access to opportunities 
• Improving Community Wellbeing
• Building strong communities 
As community confidence and capacity to grow in terms of participating in locality
planning structures and providing their ideas, there is also potential to make a more
significant contribution to the priority of ‘Improving our local environment’ which has
been a feature of some smaller scale local action to date. 
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
Corra has worked alongside 538 different community members and partners within
Blacklands over the past 6 years and has established trust and effective
relationships. This has included children at Blacklands Primary and older people
engaging in chair-based exercise and the highly valued tea and chat afterwards,
which is often group members main chance for company each week. Corra also
supports parents to be involved and lead the local parent and toddler’s group. The
community-led grant making work (Community Kitty) involved a range of community
members including children and young people, who designed the process and
identified criteria and worked very effectively together. 
6. How will the project be managed? 
Please include: 
• How the finances will be managed 
204

Page 205

COMMUNITY INVESTMENT FUND 
KILWINNING LOCALITY PARTNERSHIP
• Does the proposed project contribute to volunteering or employment opportunities in
Kilwinning? Please include the number of volunteering opportunities and employment
opportunities
• If there are any staff requirements, please outline your HR plans 
The investment will contribute to the overall budget for Blacklands and be managed
by Corra’s National Programme Manager. 
Volunteering and potential employability will be increased through development of
skills and confidence. As community members are supported to develop ideas,
community participation and volunteering increases. 
The intention is that some ideas and activity will result in the creation of governance
structures and local organisations that will develop over time and result in paid
employment. There has been 587 hours of volunteering provided so far and we
expect that to increase at a faster rate as momentum builds. 
The Community Co-ordinator is line managed by the National Programme Manager.
Corra has a central HR department that supports all staff in the organisation. 
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) £36000 over 3 years
Please give a breakdown of cost and recent quotations where appropriate. 
Getting Alongside
Communities: Blacklands
23/24 24/25 25/26 Total
Staff & Delivery Costs 43,579 43,579 43,579 130,737
Ideas into Action budget 7,500 7,500 7,500 22,500    
153,237 
From 2023–26 projected investment in Blacklands is £153k.  A contribution of £36k
(£12k p.a.) from North Ayrshire Council would be integral to the success of this
approach – and leverage further investment of £117k that would not otherwise
reach the area. 
Corra’s Board has confirmed investment in the People in Place programme for the
next 3 years.  Corra is also actively exploring investment from other partners.  A
funding commitment from North Ayrshire Council would be instrumental in securing
additional new investment, a significant endorsement of the work to date, and
underpin its continued success.
205

Page 206

COMMUNITY INVESTMENT FUND 
KILWINNING LOCALITY PARTNERSHIP 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
Monitoring and evaluation is underpinned by reflective logs, produced by Corra’s
Community Co-ordinator, which include a mix of qualitative and quantitative data and
input from community members. This informs the analysis of our approach in
Blacklands and across the programme. We use the qualitative data analysis to
identify emerging themes, challenges and opportunities within and across
communities. 
The data collected through the reflective logs also informs the Annual Update that is
produced alongside community members to describe the activity that has taken
place, its impact and what has been learned.  There are also several case studies
within each Annual Update, the most recent of which is included as an example:
Blacklands Annual Update 2022.  
Annual Updates from 2017 onwards can be accessed here. 
The Getting Alongside Communities team regularly meets with Corra’s learning team
to discuss the learning gathered and identify opportunities to evolve the approach. 
Corra also supports community members to share their experiences and impact
through community stories. An example of a Blackland’s story is:
School Costs: A community pulls together - Corra 
An annual event brings communities and partners - including council staff - together
from across the People in Place programme to share learning, exchange ideas and
plan ahead.   
In addition, Corra facilitates a Community of Practice that brings colleagues from
across different partner local authorities together to explore shared challenges,
opportunities and exchange learning.  An example of this includes collaboration
between Fife and North Ayrshire Council colleagues that was instrumental in
supporting dignified food provision in communities across North Ayrshire. 
206