Rockhill Farm Ltd: Proposed Redevelopment of Barn and Farmhouse to Form Self-Catering Tourist Accommodation Together with Erection of Self-Catering Tourist Accommodation (3 Units), Installation of Floating Jetty, Landscaping and Associated Infrastructure Works: Rockhill, Ardbrecknish, Dalmally (Ref: 21/02265/Pp)

Argyll and Bute Council · 21 August 2024
Back to Planning, Protective Services and Licensing Committee — 21 August 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 21/02265/PP
Planning Hierarchy: Local Development
Applicant: Rockhill Farm Ltd
Proposal: Proposed redevelopment of barn and farmhouse to form self-
catering tourist accommodation together with erection of self-
catering tourist accommodation (3 units), installation of floating
jetty, landscaping and associated infrastructure works
Site Address:  Rockhill, Ardbrecknish, Dalmally, Argyll and Bute, PA33 1BH    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Redevelopment of barn to form self catering holiday units (including
demolition of barn)
• Redevelopment of farmhouse to form self catering holiday unit
• Erection of three self catering holiday units
• Installation of floating jetty (retrospective)
• Formation of hardstanding circulation space
• Utilisation of existing vehicular access
• Provision of vehicular parking
• Installation of water tank
• Provision of private water supply
• Installation of bio disc treatment plant 
(ii) Other specified operations
• landscaping 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission be granted subject the conditions and
reasons appended to this report.

Page 2

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(C) CONSULTATIONS:   
NatureScot
E-mail 15.12.2021, No comments to make.  The proposal does not meet NatureScot’s
criteria for consultation. 
SEPA          
Letter dated 26.06.2024, Objection now withdrawn.  We are now in a position to
withdraw our previous objection as the topographic information provided in the
submitted Flood Risk Assessment (Doc ref. RHF-CDL-XXXX-RP-C-10201 , Appendix
C, Page 22. Cundall.) demonstrates that all proposed buildings in the site plan
(Drawing No. 20/001 , February 2024) are outwith the flood risk area as: 
- All proposed buildings lie on existing ground levels above the 1 in 200-year
plus climate change flood level of 42.32 m AOD for Loch Awe. 
- The culvert on the burn to the east of the proposed development lies at
around 39 m AOD and the nearest proposed building lies at around 46 m
AOD. As such, all of the proposed buildings are likely to be outwith the flood
risk area resulting from a blockage at this culvert and / or out of bank flow
from the burn. 
SEPA requested clarification as to whether the building to the north of the site is an
erroneous inclusion on the topographic map, or if it is proposed development in
addition to those show in the previous site plans. 
SEPA e-mail 01.07.2024, acknowledged that the additional building shown on the
topographic map of the submitted FRA, in the north of the site which was not included
in the proposed plans which SEPA previously commented on, is a temporary
premises used by contractors while works are ongoing at Rockhill Farm.  SEPA
understand that this temporary structure is not included within the proposed plans and
does not form part of the planning application.  SEPA have further highlighted that
such a building at this location would be unacceptable on the grounds of flood risk. 
Flood Risk Assessor
Report dated 05.04.2024, No objections. 
The northern portion of the site (the land on the banks of Loch Awe) is overlain by
the indicative limits of fluvial flooding as per the SEPA Future Flood Maps. Our
previous response concerned the previous site plan (dated September 2021) that
included two houses in the northern area of the site that were within the fluvial flood
extent. The revised site plan (dated February 2024) that has been submitted shows
all of the proposed development (re-development of the barn and farmhouses, and
3 new proposed self-catering units) to be located on higher ground in the southern
area of the site, and are hence outwith the fluvial flood extent. The revised site plan
is considered acceptable regarding flood risk. 
The supplied drainage layout indicates that each development will use a soakaway
as a method of mitigating surface water runoff. This is acceptable. 
Scottish Water
Letter dated 13.12.2021, No objections.  No Scottish Water Infrastructure within the     
vicinity of the proposed development.

Page 3

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Councils Roads Authority            
Report dated 28.02.2024, No objections subject to conditions with regards to the      
provision of: upgrades to the existing private access track (within ownership control
of the applicant) with Intervisible passing places required at intervals of no more than
150m.Track width to be a minimum of 3.7m. Level 2m verge/step off on one side of
track required; Total length of unpaved access track surface requires upgrade
including grading/leveling of surface, voids, potholes, rutting to be filled, levelled and
compacted, using bituminous bound material and regularly maintained as required;
visibility splays measuring 53m x 2.4m; parking and turning for two vehicles for each
of the proposed self catering units; parking and turning for three vehicles for the
farmhouse and 2 for the barn conversion and the provision of a turning head to Figure
18 of the Roads Development Guide to be provided within the farm yard area. 
Environmental Health
Memo dated 12.01.2022, Requirement for contaminated land site investigation and
risk assessment survey prior to the commencement of development at the site. 
Memo dated 06.08.2024, No objections raised subject to condition with regards to
provision of water appraisal of the wholesomeness and sufficiency of proposed
private water supply has been submitted to and approved by the Planning Authority
prior to the commencement of development at the site. 
Memo dated 08.08.2024, advised that a short-term holiday let licence will be required
to be applied for.  Also advised that safeguarding conditions will be required to avoid
any potential light nuisance and potential construction noise nuisance. 
Historic Scotland          
Letter dated 21.12.2021, No objections. Whilst not raising any objections HES have
made it clear that their decision not to object should not be taken as support for the
proposed development.  HES have advised that this planning application should be
determined in accordance with national and local policy on development affecting the
historic environment together with related policy guidance. 
West of Scotland Archaeological Services (WOSAS)         
No response at time of writing report and no request for an extension of time.          
Biodiversity Officer 
E-mail received 12.01.2022, No objections, The Biodiversity Officer welcomes the   
addition of Barn Owl boxes and bat boxes within the site.  A Landscaping and Planting
Plan has been submitted further to consultation with the Biodiversity Officer.  This plan
is lacking in detail and shows an element of tree planting. Previous to this the
Biodiversity Officer had advised that a Landscape Planting Plan could be requested via
a planning condition. 
Core Paths 
E-mail 16.06.2023, No objections, requested a suspensive planning condition with
regards to the provision of an Access Plan, Implementation Plan and a habitable
buildings Landscape plan 
Glenorchy and Inishail Community Council

Page 4

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Online submission from John Kerr, Chair of Glenorchy and Inishail Community
Council (06.01.2022), Objection raised to proposed development,  Advised that the
applicant or agent has not had a site meeting with the Community Council as
suggested in the Design and Access Document which forms part of this application. 
(D) HISTORY:   
21/00361/PP
Demolition of existing farm outbuildings, proposed change of use and extension of
existing barn and farmhouse to form wedding/function facility together with erection
of self-catering tourist accommodation (6 units), installation of septic tanks, bio disc
treatment plant, landscaping and associated works, application withdrawn
05.08.2021 
22/02038/PNCOUA
Conversion of existing barn to form extension to dwellinghouse, Not covered under
GPDO Regulations, 08.01.1022. 
22/02299/PNCOUA
Change of use of existing agricultural building to form a dwellinghouse (barn), Prior
Approval granted 20.12.2022. 
23/00183/ENOTH3
Demolition of barn subject of Prior Approval 22/02299/COU - Change of use of
existing agricultural building to form a dwellinghouse, Case to be closed. 
20/00153/ENOTH1
Unauthorised erection of self catering holiday unit, Enforcement Notice served and
appeal allowed.  Case to be closed. 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 and Neighbour
Notification procedures, overall closing date 13.01.2022. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
44 objections and 6 expressions of support have been received to the
application.  A petition has also been submitted in response to this
application objecting to the proposed development. 
OBJECTIONS 
Ms Gillian Payne, Dali Lodge, Ardbrecknish, Dalmally,  PA33 1BH, (e-mail
20.10.2022)
Ms Jennifer Gilmour, The Blue Cottage, Ardbrecknish, Dalmally, PA33 1BH, (e-
mail 07.01.2022)
Mr Laurence Mills, 79 Townsend Lane, Long Lawford, Rugby,Warwickshir,  CV23
9DG, (e-mail 18.01.2022)

Page 5

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Alan Kettle White, laia@live.co.uk, (e-mail 18.01.2022)
Mr Stephen Booth, 22 Birch Ave, Newton, Preston, PR4 3TX, (e-mail 06.01.2022)
Mr Ian Marshal, Popular Close, Ruskington, NG34 9TL, (e-mail 12.01.2022) 
Mr George Cloughley , 11a Summerlea Road, Seamill, West Kilbride, KA23 9HP,
(e-mail 06.01.2022) )   
Mr David McCormick, 3 West Drive, Ardbrecknish PA33 1BH, (e-mail 10.01.2022) 
Lady Mary McGrigor, Upper Sonachan, Portsonachan, Dalmally, PA33 1BJ, (e-
mail 10.01.2022)
Ernie Jamieson, Creag Mor, Ardbrecknish, (e-mail 10.01.2022)    
Lara Jamieson, Creag Mor, Ardbrecknish, (e-mail 11.01.2022)      
Jan Turner, mailto:janturner41@gmail.com  , (email 11.01.2022)
Mr Paul Pryde, 32 Constitution Hill, Norwich, NR3 4BU, (e-mail 07.01.2022) 
Mrs Rosemary Munson, Dali Lodge, Ardbrecknish, Dalmally PA33 1BH, (e-mail
10.01.2022)
Simon Webber, Jules Villa, Rowanbank , Dalmally , PA33 1AE, (e-mail
13.01.2022)
Mr Leon Ingham, Kairos, Slockavullin, Lochgilphead, PA31 8QG, (e-mail
12.01.2022)
Leslie Webber, Jules Villa, Rowanbank , Dalmally, PA33 1AE, (e-mail
13.01.2022)
Mrs Lesley Mills, 79 Townsend Lane, Long Lawford, Rugby Warwickshire, CV23
9DG, (e-mail 07.01.2022)
Mr Charles Larder, 2 Fell View, The Grove, Consett, DH8 8A, (e-mail 07.01.2022)
Toby Maclean, 10 Barony Terrace, Edinburgh, EH12 8RE, (e-mail 08.01.2022)
Mrs Catherine Nevison, Ardchonnel Cottage, East Lochaweside, Dalmally, PA33
1BW, (e-mail 10.01.2022
Melanie Baker, melanie4baker@hotmail.com, (e-mail 12.01.2022)     
Janet Buchanan, Innishail Cottage, Ardbrecknish, Dalmally, PA33 1BH,  (e-mail
11.01.2022) 
Jim Makinson, Ardbrecknish House, Ardbrecknish, Dalmally, PA33 1BH, (e-mail
09.01.2022) 
Sally Makinson, Ardbrecknish House, Ardbrecknish, Dalmally, PA33 1BH, (e-mail
09.01.2022) 
David McCulloch, Taigh Geal, Ardbrecknish , Near Dalmally, PA33 1BH, (e-mail
12.01.2022)
Margaret McCulloch, Taigh Geal , Ardbrecknish, Near Dalmally , PA33 1BH, (e-
mail 12.01.2022)
John Lawler, Plot 68 Loch Awe Holiday Park, Taynuilt, PA35 1HT, (e-mail
12.01.2022)
David Nesbitt ,102/22-26 Clifton Road, Clifton Beach, QLD Australia 4879, (e-
mail 09.01.2022)
Rebecca Phillips ,102/22-26 Clifton Road Clifton Beach QLD Australia 4879, (e-
mail 09.01.2022)
Mr William Smith, The Old school House, Snods Edge, Consett, DH8 9LE , (e-
mail 12.01.2022)
Mr Robert Duncan, The Rectory Ardbrecknish Dalmally Argyll And Bute PA33
1BH, (e-mail 13.01.2022)
Mr Nigel Spratt, 59 Brinkburn Avenue, Darlington, DL3 0JN, (e-mail 14.01.2022)
Mr Ewan Colville,The Blue Cottage, Ardbrecknish, Dalmally, PA33 1BH
Mr Ian Ronald, 7 West Drive, Ardbrecknish, Dalmally, PA33 1BL, (e-mail
07.01.2022)
Mr Thomas Lowcock, Ardbrecknish House, Ardbrecknish, Dalmally, PA33 1BH,
(e-mail 06.01.2022)
Mr Kevin Douglas, Hill House, Ardbrecknish, Dalmally, PA33 1BH, (e-mail
13.01.2022)

Page 6

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Mr Luke Kneeshaw, 18 Marston Close, Taunton, TA1 4HZ, (e-mail 06.01.2022)
Mr Manson, Green Cottage, Ardbrecknish , By Dalmally, PA33 1BH, (letter dated
30.12
Mrs Manson, Green Cottage, Ardbrecknish , By Dalmally, PA33 1BH, (letter
dated 30.12
Angela Peat, Sean Mhuilean An T-Sabdaih, The Old Sawmill, Ardbrecknish, By
Dalmally, (e-mail 03.01.2022)
Dr JR Peat, Sean Mhuilean An T-Sabdaih, The Old Sawmill, Ardbrecknish , By
Dalmally, (e-mail 03.01, 2022)
Ms Janet Lightbown, Taigh Hebe, Ardbrecknish, Dalmally, PA33 1BH, (e-mail
08.02.2022)
Peter Smith, Wayside, Blackpool, FY4 5BP, (e-mail 12.01.2022) 
Ardbrecknish Residents Petition 
SUPPORT 
Calum McCrae, www.barrachanderquarry.com, (e-mail 17.02.2022)   
Jon Jackson, Fernhill Stone, (e-mail 10.02.2022
James McCahey, s.r.swindowcleaning@hotmail.com, (e-mail 24.02.2022)
Mrs Jakkie Jemson, 120 Lochaber Road, Fort William, PH336TX, (e-mail
09.03.2022) 
Miss Siobhan Cameron, 5 Eorabus Croft, Ardtun, Isle Of Mull,  PA67 6DH, (e-
mail 10.03.2022)
Mr Alexander Dawson, Lochnell Lodge, Kilmore, Oban, PA34 4XU, (e-mail
22.02.2022) 
Representations are published in full on the planning application file and are
available to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
• Neighbour notification procedures haven’t been carried out correctly.
There are four building plots on East Drive plus one new building plot on
Rockhill Drive, all of which have live planning permission for one
dwellinghouse which should have been included in Neighbour
Notification. 
Officer Comment:  Neighbour notification procedures have been carried
out in accordance with legislation.  The Council is required to notify those
with an interest in "neighbouring land" of a planning application.
Neighbouring land is defined as "an area or plot of land which, or part of
which, is conterminous with or within 20m of the boundary of the land for
which the development is proposed".  The application has also been
advertised terms of Regulation 20 in the Oban Times on the 23.12.2021.  
• Unauthorised development has taken place at the site without planning
permission.  This unauthorised development risks setting out a negative
precedent should planning permission be approved.  Section 33 of The
Town and Country Planning (Scotland) Act 1997 provides that an
application for planning permission may be made retrospectively for
buildings or works constructed or carried out, or a use of land instituted,
before the date of the application.

Page 7

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Officer Comment:  The site has been the subject of enforcement
investigations which have resulted in the submission of this planning
application through negotiations.   The floating jetty has been installed
and so this application is part retrospective.   
• The red line boundary should include the whole of the Rockhill Farm
Estate which would result in the application being a major development. 
Officer Comment:  There is no requirement for the whole of the Rockhill
Farm Estate to be included in the application site edged red boundary. 
The site edged red is the planning unit which is defined as the area to
which the application relates.  The proposed development does not
propose development on the whole of the farm only on part of it which is
included in the application site edged red. 
• The application is to change the house into four separate 2 bedroom self-
catering units. 
Officer Comment:  A condition will be required to ensure that the Farm
Guesthouse (1) and Barn Conversion (4), as annotated on Drawing No
20/001, Rev E – Site Plan As proposed, shall not be subdivided and used
solely for the provision of 2 separate self catering holiday letting units. 
This is required in order to define the permission on the basis of the
Planning Authority’s assessment. 
• Concerns raised with regards to the timing of the submission of the
application during a public holiday period. 
Officer Comment:  The Council has no control over the timing of planning
application submissions. 
Roads 
• The red line boundary does not extend to the B840 and stops at the land
ownership boundary of Rockhill Farm.  Other applications using this
access have included access to the junction of the B840.  This has
affected the no of properties given neighbour notification.  Surely this
application should not have been validated and cannot realistically
progress without the inclusion of the correct red line planning coundary
drawing. 
Officer Comment:  The development which is the subject of this
application is for a reduced scheme of development from the previous
application ref 21/00361/PP which was withdrawn.  The Councils Roads
Authority does not require the provision of any upgrades to the access at
the junction of the public road or on any of the land outwith the application
site edged red.  It is considered that the site edged red boundary is
accurate. 
• A major section of the access track is not owned by the applicant and has
multiple private ownership rights.

Page 8

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Officer Comment:  The application includes a portion of the private
access track which is owned by the applicant and has certified that this
is the case in the planning application form. 
• The access road to the site will not support increased traffic
• Concerns raised with regards to Emergency services and Waste
collection services not being able to use the access road.
• Certain points of the track are no wider than 3m and many communal
heavy lorries have already been using this track for unauthorised
development which has taken place at the site.
• The access track to Rockhill is not of a robust enough construction to
cope with the increased traffic flow.
• The access at the junction with the B840 is steep and acute and this issue
should be addressed with a safe access and egress provided.
• The construction traffic accessing Rockhill Farm has not been managed
as to the numbers and timing.
• Concerns raised about the condition of the B840 road not being able to
sustain the amount of current traffic.
• The B840 should be white lined on both sides prior to any additional
development being permitted in the area.
• Concerns raised with regards to a dry stone wall acting as a boundary to
an existing dwellinghouse is inadequate and unable to support the
additional traffic and construction vehicles.
• Even on the parts that they do own there is insufficient space to create
passing spaces of the required length and breadth. 
Officer Comment:  The Councils Roads Authority has been consulted and
has raised no objections subject to conditions which includes the
provision of: upgrades to the existing private access track (within
ownership control of the applicant) with intervisible passing places
required at intervals of no more than 150m.Track width to be a minimum
of 3.7m. Level 2m verge/step off on one side of track required; Total
length of unpaved access track surface requires upgrade including
grading/leveling of surface, voids, potholes, rutting to be filled, levelled
and compacted, using bituminous bound material and regularly
maintained as required; visibility splays measuring 53m x 2.4m; parking
and turning for two vehicles for each of the proposed self catering units;
parking and turning for three vehicles for the farmhouse and 2 for the
barn conversion and the provision of a turning head to Figure 18 of the
Roads Development Guide to be provided within the farm yard area.  The
requirement for the provision of a condition to secure visibility splays
measuring 53m x 2.4m at the junction with the public road will not be
necessary.  These required visibility splays are required to be maintained
by the Council as Roads Authority under the Roads (Scotland) Act 1984. 
There is no requirement to manage construction traffic accessing
Rockhill Farm.  There is also no requirements for any works or upgrades
to any part of the access at the junction at the public road or on any
section of the B840. 
• Local maps used in the application are out of date and do not show all
the current properties along the access track.

Page 9

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Officer Comment:  The Councils GIS mapping system shows a true
reflection of the current properties accessing the access track which the
Councils Roads Authority has access to. 
Water and drainage 
• Concerns about where Rockhill Farm will source their water supply.
• Existing water supply is from a spring and is likely to be insufficient to
supply a larger development.  Ground source wells will require drilling
and more construction with further disturbance to the local environment
and neighbouring properties. 
Officer Comment:  The Environmental Health Unit have been consulted
with regards to the proposed private water supply and have raised no
objections subject to a suspensive pre-start condition to secure a report
on the proposed private water supply to ensure that it is sufficient to serve
the proposed development and does not impact on existing users of the
same supply or adjacent supplies. 
• Sewage discharge may affect the biological environment.
• The proposed bio waste disposal unit raises concerns as it will impact on
the site and any outflow on such a low-lying area of ground. 
Officer Comment:  The application proposes the installation of a biodisc
treatment plant. The Council’s Building Standards Service will apply
sufficient control over the treatment plant arrangements at Building
Warrant stage. The proposed drainage system would be regulated under
the building standards to ensure that it is capable of being provided to a
safe, effective and appropriate technical standard. Any discharge to the
water environment would be regulated by SEPA under the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 (as
amended). It is the responsibility of the installer and owner to ensure that
the drainage system is installed and maintained correctly. Pollution
enforcement is the responsibility of SEPA and as the proposed
development is not located within a Waste Water Drainage Consultation
Area there is no reason to assume that a safe and effective private
wastewater system cannot be utilised. 
Landscape 
• Understanding from speaking to planning department that no
development in Ardbrecknish outwith the development plan would be
considered and that “rounding-off” may be an option.  The proposed
development is clearly not a case of “rounding-off”. 
Officer Comment:  The proposal is considered to be consistent with the
relevant provisions of the Development Plan and there are no other
material considerations of sufficient significance, including issues raised
by third parties, to indicate that it would be appropriate to withhold
planning permission having regard to Section 25 of the Act.  See main
assessment in Appendix A below.

Page 10

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Design 
• The “box” like construction of the existing cabin and other proposed new
builds will not be in keeping with the other loch-side developments in the
area that all have sloping roofs. 
Officer Comment:  The existing cabin which is located to the north of the
site does not form part of this planning application and benefits from
permitted development rights as a temporary building used by
contractors while works are ongoing at Rockhill Farm 
• The widely spaced sites of the cabins leaves raises concerns about
further applications for infill sites and ongoing creeping of the site. 
Officer Comment:  Any further planning applications proposed at the site
would be considered on their own merits and assessed against the
relevant provisions of the Development Plan 
Biodiversity 
• Concerns raised with regards to fish in the loch as a result of increased
human traffic in this area.
• Proposed development will have a devastating effect on wild life which
includes a large amount of different birds, bats and rare Hen Harrier.
• Demolition of previous farm buildings has already taken place without an
ecological survey of the area.  It is known that bats had roosts in these
buildings and that swallows nested.
• No mention of frogs and toads in any environmental study or any
remedial steps.
• Concerns raised with regards to the intended use of the jetty and general
boating on Lochawe and impacts on spawning and feeding ground for
fish in the shallow bay.
• The stream that feeds Wire Bay needs to be protected from construction
and operational activities. 
Officer Comment:  The applicant has submitted a Survey for Otters &
Birds and Potential Roost Assessment for Bats, a Tree Plan and a
Sustainability Checklist in support of the proposed development. 
Scottish natural Heritage (SNH) have been consulted and have advised
that the proposal does not meet with their criteria for consultation 
The Council’s Biodiversity Officer has been consulted and has raised no
concerns raised no objections to the proposed development and has
provided comments on each report which is as follows: 
Survey for Otters & Birds and Potential Roost Assessment for Bats
The findings of the surveys and the mitigation are acceptable.  The
survey recommends that if works do not begin within 18 months of the
report then a survey for otter should be repeated.  The proposed self
catering units which were proposed to be sited near the Loch and beside
the watercourse at the eastern side of the site have been omitted from
the application and so it is considered that such a condition will no longer
be necessary. The Biodiversity Officer has provided advice with regards

Page 11

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
to working practices and protocols for the developer to follow during
construction works which will be added on as a note to the applicant.  The
Biodiversity Officer welcomes the addition of Barn Owl boxes and bat
boxes within the site. 
Tree Plan (4th of August 2021)
It is noted that one of the Ash trees (with signs of rotting and Ash die
back) is recommended for felling as it is considered dangerous – this is
acceptable along with a pre-felling survey for the presence of bats.  The
tree protection proposal is acceptable.  I advise that contractors are made
aware and implement the plan prior to work commencing.  A note to the
application will be required to relay this advice. 
A Landscaping and Planting Plan has been submitted further to
consultation with the Biodiversity Officer.  This plan is lacking in detail
and shows an element of tree planting. Previous to this the Biodiversity
Officer had advised that a Landscape Planting Plan could be requested
via a planning condition. 
Previous farm buildings at the site which have been demolished did not
require the benefit of planning permission.  Therefore the Council could
not afford any protection to any species that may have inhabited these
buildings. 
A condition will be required in order to ensure that the jetty is used solely
for the recreational purposes of the occupants of Rockhill Farm and not
for any commercial purposes.  The use of this jetty for recreational
purposes of the occupants of Rockhill Farm does not raise any concerns
with regards to fish that may be present in the loch.   
Noise and Light 
• Increased and excessive noise levels originating from oversized vehicles
on the B840 and the track leading to Rockhill Farm.
• Concerns with regards to light pollution from Rockhill Farm.  Site lights
have been erected and are left on permanently. 
Officer Comment:  The Councils Roads Authority has been consulted and
has not raised any concerns with regards to potential noise pollution
emanating from the proposed development.  The Environmental Health
Unit have been consulted and have  advised that safeguarding conditions
will be required to avoid any potential light nuisance and potential
construction noise nuisance at the site. 
Amenity                
.
• Concerns raised with regards to the loss of the tranquil nature of the loch
which may be disrupted by the use of powerful watercraft. 
Officer Comment:  A small floating jetty forms part of this planning
application.  A condition will be required in order to ensure that the jetty
is used solely for the recreational purposes of the occupants of Rockhill
Farm and not for any commercial purposes.  The use of the loch by

Page 12

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
watercrafts is not development and the Planning Authority are not able to
control the type of watercrafts that use the Loch.   
• Locked electric gates and high fence have been erected and are
obstructing walkers access 
Officer Comment:  The Councils Access Manager has been consulted
and has raised no objections to the proposed development subject to the
requirement of an Access Plan via planning condition.  An Access Plan
should contain specification for all paths and gates, an implementation
plan and a habitable buildings Landscape Plan.   
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No (if Yes insert
EIAR topics below)  
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No (if Yes
attach as an appendix)  
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
A Supporting Design and
Access Statement has
been submitted with the
application the content of
which is discussed in the
main assessment of the
application within
Appendix A of this report.  
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
☒Yes ☐No
☒Yes ☐No  
(v) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☒Yes ☐No (if Yes list
supporting documents
below) 
Flood Risk Assessment, RHF-CDL-XX-XX-RP-C-10201,
28.05.2024Parts 1-7                       
Ardbrecknish Rendered Visualisations                       
ECS Access Review

Page 13

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
ECS Refuse Vehicle Access – Swept Path
Analysis
Outdoor Access Plan – North Planning &
Development 
Design and Access Statement – North Planning
and Design 14.03.2024
Bat Survey Report – TransTech Limited
Survey for Otters & Birds & Potential Roost
Assessment for Bats – TransTech Limited Parts
1-4
Tree Plan – TransTech Limited
Historic Building Recording and Archaeological
Monitored Topsoil Strip Report, AOC
Archaeology Group, 24.09.2021 – Parts 1-3 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No (if Yes insert details of the
terms and heads of agreement and,
grounds for refusal if not completed
within 4 months below)   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No (if Yes insert details of direction below)    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023)
(delete as appropriate) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 18 – Infrastructure First

Page 14

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
NPF4 Policy 22 – Flood Risk and Water Management 
Productive Places
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance 
Diverse and Sustainable Economy 
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities 
Connected Places 
Policy 32 – Active Travel
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 79 – Protection of Soil and Peat Resources
Policy 83 – Safeguarding Agricultural and Croft Land

Page 15

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. (delete as appropriate) 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN21 VII and LVIA Light Technical Note (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• SEPA Standing Guidance for Development Management (Dec. 2022) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No (if Yes confirm date of screening opinion and
reference below)    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No (if Yes provide summary detail of PAC below) 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No (if Yes insert details
below) 
In deciding whether to hold a discretionary hearing
Members should consider:  
• How up to date the Development Plan is, the
relevance of the policies to the proposed
development, and whether the representations are
on development plan policy grounds which have
recently been considered through the development
plan process. 
• The degree of local interest and controversy on
material considerations, together with the relative
size of community affected, set against the relative
number of representations and their provenance. 
At the time of writing, 44 objections and 6 expressions
of support have been received to the application.  A
petition has also been submitted in response to this
application objecting to the proposed development. 
The main thrust of the objections raised relate to the
unsuitability of the junction with the public road and the
private vehicular access track which serves the

Page 16

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
application site.  In this regard the applicant has worked
closely with the Council’s Roads Authority to agree the
proposed access regime to serve the proposed
development which includes the provision of upgrades
to the existing private access track (within ownership
control of the applicant) with intervisible passing places
required at intervals of no more than 150m.Track width
to be a minimum of 3.7m. Level 2m verge/step off on
one side of track required; Total length of unpaved
access track surface requires upgrade including
grading/leveling of surface, voids, potholes, rutting to be
filled, levelled and compacted, using bituminous bound
material and regularly maintained as required; visibility
splays measuring 53m x 2.4m; parking and turning for
two vehicles for each of the proposed self catering units;
parking and turning for three vehicles for the farmhouse
and 2 for the barn conversion and the provision of a
turning head to Figure 18 of the Roads Development
Guide to be provided within the farm yard area.  The
upgrades to the existing private access track (within
ownership control of the applicant) will be required to be
completed prior to the development first being brought
into use 
The requirement for the provision of a condition to secure
visibility splays measuring 53m x 2.4m at the junction
with the public road will not be necessary.  These
required visibility splays are required to be maintained
by the Council as Roads Authority under the Roads
(Scotland) Act 1984. 
The development which is the subject of this application
is for a reduced scheme of development from the
previous application ref 21/00361/PP which was
withdrawn.  The Councils Roads Authority does not
require the provision of any upgrades to the access at
the junction of the public road or on any of the land
outwith the application site. 
The main other concerns raised by objectors relate to
biodiversity, water and drainage and noise and light
emanating from the site and construction vehicles
entering the site.  It is the opinion of the Planning
Authority that a suite of safeguarding conditions can
address these concerns raised by objectors.   
No objections have been received from consultees with
regards to the proposed infrastructure to serve the
proposed development. 
It is the opinion of the Planning Authority that the
representations received, together with officer
assessment of the relevant planning issues contained
within this report, provide all the information required to
enable Members to make an informed decision based

Page 17

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
on all of the material planning considerations in this
case. 
In this instance it is not considered that the objections
raise any complex or technical issues that have not been
addressed in the current Report of Handling and it is not
considered that a discretionary local hearing would add
value to the planning process. 
The determining factor in the assessment of this
application is whether the proposed small scale tourism
development is consistent with the provisions of the
adopted National Planning Framework 4 and Local
Development Plan 2 and whether the issues raised by
third parties raise material considerations of sufficient
significance to withhold planning permission. 
The proposed development is considered to be consistent with
the provisions of both the adopted National and Local Policy
with the issues raised by third parties not amounting to material
planning considerations that have not been addressed through
the processing of the planning application.  
(O)(i) Key Constraints/Designations Affected by the Development: 
• Site located within Local Landscape Area (Formerly known as APQ (Area of
Panoramic Quality)
• Archaeology
• Scheduled Ancient Monuments in vicinity of site
• Flooding 
(O)(ii) Soils
Agricultural Land Classification:  Class 5.3 – Land capable of use as
improved grassland.  Pasture
deteriorates quickly.
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: (Insert)metres / N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☒No ☐N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☒No ☐N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☒Yes
☐No

Page 18

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Does the proposal include any replacement or
compensatory planting?
☒Yes
☐No details to be secured by condition
☐N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☒Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
(tick all relevant boxes) 
☐Settlement Area
☒Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
(Insert details) or N/A 
(P) Summary assessment and summary of determining issues and material
considerations 
Planning permission is sought for the redevelopment of barn and farmhouse to
form self-catering tourist accommodation together with erection of self-catering
tourist accommodation (3 units), installation of floating jetty, landscaping and
associated infrastructure works at Rockhill, Ardbrecknish, Dalmally, Argyll and
Bute, PA33 1BH. 
It is important to note that the proposed development has been reduced in scale
during the processing of this application. The application originally proposed the
demolition of existing farm outbuildings, alterations, change of use and extension
of existing barn and farmhouse to form self-catering tourist accommodation,
erection of 6 self-catering tourist accommodation cottages, retrospective
installation of floating jetty, installation of septic tanks and bio disc treatment plant. 
Three of the proposed self-catering tourist accommodation units have now been
omitted from the application as a result of issues pertaining to flood constraints
within the site. A large barn was previously attached to the farmhouse which has
recently been demolished which formed part of prior approval application ref
22/02299/PACOUA.  Prior approval was granted on the 20th of December 2022 for
the change of use of an existing agricultural building to form a dwellinghouse. The
demolition of this building did not require the benefit of planning permission.  This
grant of prior approval is no longer able to be implemented as a result of the barn
being demolished.   It is now proposed to demolish the farmhouse and to redevelop
this site along with the barn site to form 2 self catering tourist accommodation units. 
The total of self catering tourism units to be formed in total is now five and not 8 as
originally proposed by this application. 
The application site lies within an area identified as ‘Countryside Area' (CA) where
Policy 02 of LDP2 gives a presumption in favour of sustainable development where
it is of an appropriate scale, design, siting and use for its countryside location, as
set out in the relevant sustainable siting and design policies of LDP2. 
Policy 02 further states that certain development will be supported, generally
without the need for detailed environmental assessments, with these comprising,

Page 19

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
infill, redevelopment opportunities of clusters; or previously developed sites. 
In CAs, where there are nature conservation or landscape designations in place,
Policy 02 details that development proposals will have to demonstrate that they
are compatible with the designation interests. 
The site lies within a designated Local Landscape Area (LLA) (formerly Area of
Panoramic Quality) where LDP2 seeks to promote a flexible approach to small
scale development in the Countryside through Policies 02 and 71 which clarify
when the planning authority may require submission of a Landscape Visual
Impact Assessment (LVIA). 
A Design and Access Statement has been submitted in support of the proposed
development.  The site has been visited on a number of occasions as part of
enforcement investigations, the previously submitted application which has been
withdrawn and the current proposal which is the subject of this application.   A
Sustainability Checklists and Sustainability Buildings Checklist have also been
submitted in support of the proposed development.   
From the information which has been submitted it has been concluded by officers
that no further information is required in terms of landscape or visual impacts.
The site is not  highly visible within the landscape which has been demonstrated
by the applicant and has been experienced by Officers on the ground. 
Consideration of these matters, alongside other relevant planning considerations,
are assessed in further detail below. 
Rockhill Farm occupies a large area of ground that is elevated at the southern side,
dropping towards the shores of Loch Awe.  The application site lies in the
foreground of the farm to the north on land which is gently sloping towards the
shores of Loch Awe.  The existing farmhouse and buildings are located on the
flattest part of the site in a set back position overlooking the loch.  The farmhouse
is currently vacant and dilapidated, most recently functioning as an eight bedroom
bed and breakfast while the two cottage premises have been previously used for
residential lettings and are currently used for the provision of self-catering tourist
accommodation.  The site is also located within the setting of two Scheduled
Ancient Monuments and lies within a designated Local Landscape Area (formerly
known as an Area  of Panoramic Quality in the previous LDP) 
The development proposed by this application is considered to be development
that will facilitate the use of a derelict farm which is inhibited by a number of
empty dilapidated buildings largely on a brownfield site by virtue of the fact that it
is a proposal seeking to redevelop an existing dilapidated farmhouse and barn
which form part of a cluster of buildings within the Rockhill Farm Estate.  The
additional 3 self catering units will be sited in relatively close proximity to the
farmhouse and barn on the land to the west.  The applicant has evidenced that
the sites which the proposed self catering units will be sited on have previously
accommodated outbuildings/sheds.   
It is proposed to demolish the existing farmhouse building and to then build a
replacement building which will site on the exact same footprint of the farmhouse
and previously attached barn which has already been demolished.  The
replacement building will comprise of two separate self catering holiday units.    The
proposed self catering units will have a similar appearance when viewed from the
loch to the north as the building which it is proposed to replace.  The plans indicate

Page 20

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
that the roof will be finished with part natural slate and part standing seam metal
sheeting. 
It is proposed to erect three detached self catering units within the site on land to
the west of the two existing self catering units which are located to the immediate
west of the farmhouse building. 
The overall design and form of each unit is contemporary in character which reflects
the agricultural vernacular of the application site.  The walls will be clad using
Scottish larch and the roof will be finished with a standing seam cladding.   
The proposed development will utilise a private access track which is situated off
the B840 East Lochaweside Road.   
The application indicates the provision of a private water supply with a private
drainage system comprising a biodisc treatment plant proposed due to the lack of
public drainage infrastructure within the vicinity of the site 
No objections have been raised by any of the consultees. 
At the time of writing, representations had been received by the Planning Authority
from 50 respondents in relation to this planning application. 44 respondents raise
objection and 6 raise expressions of support. 
The proposed small scale tourism development is considered to be consistent with
the provisions of the adopted National Planning Framework 4 and Local
Development Plan 2 with the issues raised by third parties not considered to raise
material considerations of sufficient significance to withhold planning permission. 
Taking account of the above, it is recommended that planning permission be
approved subject to conditions.   
A full report is provided in Appendix A. 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of
the Development Plan and there are no other material considerations of
sufficient significance, including issues raised by third parties, to indicate that
it would be appropriate to withhold planning permission having regard to
Section 25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A

Page 21

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No (If yes provide detail below)   
Author of Report: L Cuthbertson Date: 02.08.2024 
Reviewing Officer: Peter Bain Date: 07.08.24 
Fergus Murray
Head of Development & Economic Growth

Page 22

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 21/02265/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 25.10.2021; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Site Plan As
Existing
10/010 Rev A 18.03.2024
Site Plan as
Proposed
20/001 Rev E 18.03.2024
Site Plan as
Proposed 1:500
20/001  
Site Plan as
Proposed 1:5000
20/001 Rev E 18.03.2024
Farmhouse & Barn
Plan As Existing
20/001 Rev B 18.03.2024
Farmhouse & Barn
Elevations As
Existing
20/001 Rev A 01.12.2021
Farm Guesthouse 
Barn Elevations as
Proposed
20/001 Rev C 18.03.2024
Farmhouse & Barn
Plan as Proposed
20/001 Rev C 18.03.2024
Drainage and
water supply layout
21-017-20 Rev C 18.03.2024
Landscape
Planting Plan  
18.03.2024
Cottage A1
Elevation as
Proposed
20/001 Rev A 18.03.2024
Cottage A1, Plan
as Proposed
20/001 Rev A 18.03.2024
Cottage A2
Elevations as
Proposed
20/001 Rev A 18.03.2024
Cottage A2 Plan as
Proposed
20/001 Rev A 18.03.2024
Cottage C
Elevations as
Proposed
20/001 Rev A 18.03.2024
Cottage C Plan as
Proposed 
20/001 Rev A 18.03.2024

Page 23

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Section as
Proposed
20/001 Rev E 18.03.2024
Rendered
Visualisations  
18.03.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. PP – Vehicular Access 
No development shall commence until plans and particulars of the means of
vehicular access to serve the development have been submitted to and approved
by the Planning Authority in consultation with the Roads Authority. Such details shall
incorporate:   
i) Details of upgrades to the existing private access track (within
ownership control of the applicant) with intervisible passing places
required at intervals of no more than 150m.Track width to be a minimum
of 3.7m. Level 2m verge/step off on one side of track required; 
ii) Total length of unpaved access track (within ownership control of the
applicant) surface requires upgrade including grading/leveling of
surface, voids, potholes, rutting to be filled, levelled and compacted,
using bituminous bound material and regularly maintained as required;
iii) Details of parking and turning for two vehicles for each of the proposed
self catering units; parking and turning for three vehicles for the
farmhouse and 2 for the barn conversion:
iv) Details of a turning head to Figure 18 of the Roads Development Guide
to be provided within the farm yard area 
The upgrades to the existing private access track (within ownership control of the
applicant) shall be completed prior to the development first being brought into use. 
Reason: In the interests of road safety. 
3. PP – Surface Water Drainage – Further detail required 
Notwithstanding the provisions of Condition 1, no development shall commence until
details of the intended means of surface water drainage to serve the development
have been submitted to and approved in writing by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development and maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant: 
Regard should be had to SEPA’s consultation comments in relation to the proposed
development. 
4. PP – Landscaping Scheme and Biodiversity Enhancement Measures

Page 24

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed
datum;
ii) Existing landscaping features and vegetation to be retained; Details shall
include tree protection measures to ensure that the trees which are
located along the boundary of the eastern side of plot 7 are retained and
maintained in perpetuity. 
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location,
species and size of every tree/shrub to be planted;
v) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance;
vi) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development. 
All of the hard and soft landscaping works shall be carried out in accordance with
the approved scheme unless otherwise approved in writing by the Planning
Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to
be planted unless otherwise approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being
brought into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity and in order to comply with the requirements of NPF4 Policy 3. 
Note to Applicant 
The applicant is advised to observe the content of the consultation response which
has been received from the Councils Biodiversity Officer.

Page 25

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
5. PP – Finishing Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
written details of the proposed external finishing materials to be used in the
construction of the proposed development including details of the proposed decking
have been submitted to and approved in writing by the Planning Authority. The
development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
6. PP – Private Water Supply 
No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
Note to Applicant: 
Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
7. PP – Outdoor Access Plan 
No development shall commence until a detailed Outdoor Access Plan of public
access across the site (as existing, during construction and following completion) has
been submitted to, and approved in writing by, the Planning Authority. The plan shall
include details showing:  
i) All existing access points, paths, core paths, tracks, rights of way and other
routes (whether on land or inland water), and any areas currently outwith
or excluded from statutory access rights under Part One of the Land
Reform (Scotland) Act 2003, within and adjacent to the application site; 
ii) Any areas proposed for exclusion from statutory access rights, for reasons
of privacy, disturbance or effect on curtilage related to proposed buildings
or structures;

Page 26

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
iii) All proposed paths, tracks and other routes for use by walkers, riders,
cyclists, all-abilities users, etc. and any other relevant outdoor access
enhancement (including construction specifications, signage, information
leaflets, proposals for on-going maintenance etc.); 
iv) Any diversion of paths, tracks or other routes temporary or permanent,
proposed as part of the development (including details of mitigation
measures, diversion works, duration and signage). 
The approved Outdoor Access Plan, and any associated works, shall be implemented
in full prior to the first occupation of the development or as otherwise may be agreed
within the approved plan. 
Reason: In order to safeguard public access both during and after the construction
phase of the development. 
Note to Applicant 
The applicant is advised to observe the consultation response which has been
received from the Council’s Access Manager. 
8. PP – Contaminated Land 
No development shall commence until an assessment of the condition of the land has
been undertaken, submitted and approved in writing by the Planning Authority.  The
assessment shall determine the nature and extent of any contamination on the site
and identify any potential risks to human health, the water environment, property or
designated ecological sites. 
Where contamination is identified, then a detailed remediation scheme to bring the site
to a condition suitable for the intended use must be prepared and be subject to the
approval in writing of the Planning Authority. The scheme must include all works to be
undertaken, proposed remediation objectives and remediation criteria. The scheme
must ensure that the site will not qualify as contaminated land under Part 2A of the
Environmental Protection Act 1990 in relation to the intended use of the land after
remediation. 
Any approved remediation scheme must be carried out in accordance with its terms
prior to the commencement of development with the exception of those actions
required to carry out remediation unless otherwise agreed in writing by the Planning
Authority. Following completion of measures identified in the approved remediation
scheme, a verification report that demonstrates the effectiveness of the remediation
must be produced, and is subject to the approval in writing of the Planning Authority. 
Reason:  In order to ensure that contamination issues on the site have been fully
investigated and remediated. 
Note to Applicant: 
• Regulatory requirements for land contamination issues should be discussed
with the Council’s Environmental Health Officers in the first instance. 
9. The floating jetty shall be used solely for recreational purposes by the residents of
Rockhill Farm Estate and for no commercial purposes.

Page 27

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Reason:  To define the permission on the basis of the Planning Authority’s assessment
of the use applied for. 
10. That the Farm Guesthouse (1) and Barn Conversion (4), as annotated on Drawing No
20/001, Rev E – Site Plan As proposed, shall not be subdivided and used solely for
the provision of 2 separate self catering holiday letting units. 
Reason:  To define the permission on the basis of the Planning Authority’s assessment
of the use applied for. 
11. PP– Short Term Residential Accommodation (e.g. Holiday Letting) 
Notwithstanding the provisions of Class 9 of the Town and Country Planning (Use
Classes) (Scotland) Order 1997 the residential accommodation hereby approved shall
be used for short term holiday occupancy only and not as a main residence and shall
not be occupied by any family, group or individual for a cumulative period of more than
three calendar months in any one year. A register showing dates of arrivals and
departures shall be maintained at the premises and shall be available at all reasonable
times for inspection by the Planning Authority. 
Reason: To define the permission on the basis of the Planning Authority’s assessment
of the use applied for. 
Note to Applicant: 
• For the avoidance of doubt this permission only provides for the occupation of
the premises on a short term basis on the grounds that the development is
unsuited to full time residential occupation. Specifically the occupation of the
premises as a dwelling shall require the benefit of a separate planning
permission. 
12. PP – Site Waste Management Plan 
No development shall commence until a detailed Site Waste Management Plan
(SWMP) during construction has been submitted to, and approved in writing by, the
Planning Authority. The plan shall include details for the management of pollution
prevention monitoring and mitigation measures for all construction activities 
The approved SWMP shall be implemented in full prior to the first occupation of the
development or as otherwise may be agreed within the approved plan. 
Reason:  In order to ensure that effective provision for waste/recycling is provided. 
13. No development shall commence until full details of any external lighting to be used
within the site has been submitted to and approved in writing by the Planning Authority.
Such details shall include the location, type, angle of direction and wattage of each
light which shall be so positioned and angled to prevent any glare or light spillage
outwith the site boundary. 
No external lighting shall be installed except in accordance with the duly approved
scheme. 
Reason: In order to avoid light pollution in the interest of amenity.

Page 28

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Note to Applicant: 
All external lighting should be designed in accordance with the Scottish Government’s
Guidance Note “Controlling Light Pollution and Reducing Light Energy Consumption”
2007, Annexes A and B. Site specific advice may be obtained by contacting the
Council’s Environmental Health Officers. 
14. Notwithstanding the provisions of Condition 1, co construction plant and/or machinery
shall be operated on the site outwith the following times: 
• Monday to Friday: 08:00-18:00
• Saturday: 08:00-13:00
• Sunday: No noisy work to be carried out at any time 
Reason: In order to protect the amenity of the area in terms of nuisance..

Page 29

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:
21/02265/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The proposal which is the subject of this planning application is seeking planning
permission for the proposed redevelopment of barn and farmhouse to form self-catering
tourist accommodation together with erection of self-catering tourist accommodation (3
units), installation of floating jetty, landscaping and associated infrastructure works. 
It is important to note that the proposed development has been reduced in scale during
the processing of this application. The application originally proposed the demolition of
existing farm outbuildings, alterations, change of use and extension of existing barn and
farmhouse to form self-catering tourist accommodation, erection of 6 self-catering tourist
accommodation cottages, retrospective installation of floating jetty, installation of septic
tanks and bio disc treatment plant.  Three of the proposed self-catering tourist
accommodation units have now been omitted from the application as a result of issues
pertaining to flood constraints within the site.  The proposals which are the subject of this
application are detailed in section 3 below. 
2. Settlement Strategy 
2.1. In terms of the adopted LDP2 the site is defined as ‘Outwith Settlement Areas’ within an
area identified as ‘Countryside Area' (CA) where Policy 02 of LDP2 gives a presumption
in favour of sustainable development where it is of an appropriate scale, design, siting
and use for its countryside location, as set out in the relevant sustainable siting and
design policies of LDP2. 
Policy 02 further states that certain development will be supported, generally without the
need for detailed environmental assessments, with these comprising, infill,
redevelopment opportunities of clusters; or previously developed sites. 
In CAs, where there are nature conservation or landscape designations in place, Policy
02 details that development proposals will have to demonstrate that they are compatible
with the designation interests. 
The site lies within a designated Local Landscape Area (LLA) (formerly Area of Panoramic
Quality) where LDP2 seeks to promote a flexible approach to small scale development in
the Countryside through Policies 02 and 71 which clarify when the planning authority may
require submission of a Landscape Visual Impact Assessment (LVIA). In this instance the
proposed development is not considered likely to have a significant adverse effect upon
the LLA designation. The assessment of landscape matters is set out in Section 5.4
below. 
LDP2 Policy 23 sets out a general presumption in favour of new or improved tourism
facilities and accommodation. A detailed assessment of the matters identified under LDP2
Policy 23 are addressed within Section 5.13 below. 
3. Application Site

Page 30

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The site is located within Rockhill Farm which is a landholding comprising approximately
130 acres of agricultural grazing land with areas of woodland and associated structures. 
Rockhill Farm is located on the southern side of Loch Awe, west of Claddich and is
accessed from a privately owned track which runs from the B840.    There is a farmhouse
and 2 residential cottage properties which form a cluster of development within the
northern part of the farm.   A large barn was previously attached to the farmhouse which
has recently been demolished which formed part of prior approval application ref
22/02299/PACOUA.  Prior approval was granted on the 20th of December 2022 for the
change of use of an existing agricultural building to form a dwellinghouse. The demolition
of this building did not require the benefit of planning permission.  This grant of prior
approval is no longer able to be implemented as a result of the barn being demolished. 
As well as being used for agricultural grazing, Rockhill Farm previously operated as one
of the UK’s largest stud farms and accommodated a significant number of sheds and
outbuildings, associated with this previous use, located across the farm estate. The
majority of these sheds and structures have been removed by the applicant.   However
some of these structures do remain. Enclosed with our client’s application are drawings
which evidence the proliferation of structures associated with the site’s previous stud farm
use, together with the current arrangements on site. 
Rockhill Farm occupies a large area of ground that is elevated at the southern side,
dropping towards the shores of Loch Awe.  The application site lies in the foreground of
the farm to the north.  The existing farmhouse and buildings are located on the flattest
part of the farm in a set back position overlooking the loch.  The farmhouse is currently
vacant and dilapidated, most recently functioning as an eight bedroom bed and breakfast
while the two cottage premises have been previously used for residential lettings and are
currently used for the provision of self-catering tourist accommodation.   
To the south of Rockhill Farm is the minor settlement of Arbrecknish which includes a
mixture of dwellinghouses, tourist accommodation and Ardbrecknish House Hotel. 
Rockhill Farm is located to the north of Ardbrecknish and has a distinctive isolated
character being well separated from the minor settlement.  Beyond Ardbrecknish, the local
area is predominantly rural although it is home to various built developments, many of
which have frontage to, or which overlook the loch. To the immediate west of the
application site is Loch Awe Boats, a boat hire and marina business, which has direct
access onto the loch.  This commercial operation also includes areas of hardstanding, a
loch side timber cabin, associated moorings and jetties. 
The land at Rockhill has an undulating topography, and in general terms, the land falls
from south to north with the farm estate sitting at a much lower level than the B840 to the
south. The land around the existing farm buildings, and towards the loch shore, is
generally level, with a gentle fall towards the edge of the loch. Running along the loch
shore are a number of mature trees and areas of soft landscaping, while there are also
expansive areas of mature trees and planting to the east and south east of the existing
buildings. 
4.   Proposed Development 
The proposed development which is the subject of this application has been reduced in
scale.  The application originally proposed the demolition of existing farm outbuildings,
alterations, change of use and extension of existing barn and farmhouse to form self-
catering tourist accommodation, erection of 6 self-catering tourist accommodation
cottages, retrospective installation of floating jetty, installation of septic tanks and bio disc
treatment plant.  Three of the proposed self-catering tourist accommodation units have
now been omitted from the application.  The current application comprises of the following:

Page 31

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• Redevelopment of barn to form self catering holiday unit (including
demolition of barn)
• Redevelopment of farmhouse to form self catering holiday unit
• Erection of three self catering holiday units
• Installation of floating jetty (retrospective)
• Formation of hardstanding circulation space
• Utilisation of existing vehicular access
• Provision of vehicular parking
• Installation of water tank
• Provision of private water supply
• Installation of bio disc treatment plant 
The existing farmhouse and attached barn are the principle buildings on the site.  It is
proposed to demolish the existing farmhouse within the site which is in a dilapidated
condition. The farmhouse is a one and a half storey building which is of traditional design
predominantly finished in stone with a slate roof and extensions with concrete tile roofs. 
A single storey stone barn has been demolished which was attached to the western side
of the farmhouse building which formed part of prior approval application ref
22/02299/PACOUA as detailed above.  It is also proposed to demolish the existing
farmhouse building and to then build a replacement building which will site on the exact
same footprint of the farmhouse and previously attached barn.  The replacement  building
will comprise of two separate self catering holiday units  The proposed building will slightly
overlap the footprint of the building which is to be demolished.  The building will be split
into two with one occupying the barn part of the site and one occupying the farmhouse
part of the site.  The proposed self catering holiday unit at the barn part of the site will be
single storey in height and will comprise of: a kitchen with a mezzanine; an entrance; a
sauna with a toilet; and four en-suite bedrooms.  The proposed self catering holiday unit
at the farmhouse part of the site will  be largely single storey with a one and three quarter
section at the rear southern end of the building will comprise of: two kitchens (one with an
integral living room); an entrance hall; one saunas; two w/c’s; two bathrooms; 2 shower
rooms; utilities room and three bedrooms (two with en-suite facilities).  There are a small
number of rooms on the ground floor in this part of the building which have not been titled
and their use is uncertain. This self catering holiday unit has a number of entrance points
to the building and a planning condition will be required to ensure that this unit is used as
a single short term holiday letting unit and not subdivided for parts to be occupied
separately. 
The proposed self catering units will have a similar appearance when viewed from the
loch to the north as the building which it is proposed to replace.  The plans indicate that
the roof will be finished with part natural slate and part standing seam metal sheeting. 
It is proposed to erect three detached self catering units within the site on land to the west
of the two existing self catering units which are located to the immediate west of the
farmhouse building which are annotated as plots 5 (A1), 6 (A2) and 7 (Cottage C) on the
proposed site plan. 
The proposed self catering unit at plot 5 (A1) will be single storey in height and will have
a pitched roof with gable ends.  The unit will incorporate a large element of glazing on the
front facing northern elevation in order to maximise the views over the loch.  The overall
design and form is contemporary in character which reflects the agricultural vernacular of
the application site.  The walls will be clad using Scottish larch and the roof will be finished
with a standing seam cladding.  An area of decking will be formed at the front of the
proposed unit and will wrap around the north eastern corner.

Page 32

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The proposed self catering unit at plot 6 (A2) will be similar in design and scale as the
proposed self catering unit at lot 5 (A1).  This unit will orientated slightly differently taking
into account the form of the access track.  The proposed unit will incorporate a large
element of glazing on the front facing northern elevation in order to maximise the views
over the loch.  The overall design and form is contemporary in character which reflects
the agricultural vernacular of the application site.  The walls will be clad using Scottish
larch and the roof will be finished with a standing seam cladding.  An area of decking will
be formed at the front of the unit and will wrap around the north eastern corner. An area
of decking will be formed at the front of the proposed unit 
The proposed self catering unit at plot 7 (Cottage C) will take a slightly different form being
one and a half storeys in height and will have a shallow pitched roof.  The first floor will
incorporate windows on both the north and south facing elevations that will join onto
windows in the roof in order to maximise views and light.  The rear south facing elevation
will incorporate a small projection which will incorporate a roof terrace. The proposed unit
will incorporate a large element of glazing on the front facing northern elevation in order
to maximise the views over the loch.  The overall design and form is contemporary in
character which reflects the agricultural vernacular of the application site.  The walls will
be clad using Scottish larch and the roof will be finished with a standing seam cladding. 
An area of decking will be formed at the front of the unit and will wrap around the north
eastern corner. An area of decking will be formed at the front of the proposed unit which
will wrap around the north eastern corner.   
A condition will be required in order to ensure that the specific finishing details of the
proposed units and decking areas are submitted for the written approval of the Planning
Authority prior to the commencement of development at the site. 
The proposed units will be positioned in a similar set back position as the existing
buildings to the east and will be set back against an existing farm track which runs to the
west of the existing self catering units which are located to the west of the farmhouse. 
Plots 5 and 6 are areas of land which sit at a slightly higher level than the existing buildings
at the farm. The farm track gently rises to the west where the ground is slightly more
elevated.  Plot 7 is an area of land which is set further along the access track on an area
of higher ground which is slightly set apart from plots 5 and 6.  Plot 7 occupies the upper
corner of an undulating rugged area of ground that is backdropped with a small hill at the
immediate rear southern side.  There is a row of semi mature scots pine trees which run
along the boundary of the eastern side of plot 7 which will also provide this part of the site
with a backdrop.  It is considered that the small hill to the rear southern side of this plot
coupled together with the row of trees to the immediate eastern side of the plot will ensure
that the proposed self catering unit proposed to be erected at this site will be well
integrated with the surrounding landscape. 
A floating jetty has been installed at the north western part of the site in Loch Awe.  This
jetty has been installed by the applicant.  The supporting Design Statement specifies that
this jetty is approximately 10 metres in length and does not require any fixtures or fittings
which connect with the bed of the loch.  The jetty is connected to the loch shore fixed via
two small posts where the shore meets the land.  This jetty is fairly minor in nature and
does not have any impact on the landscape and is considered to be acceptable at this
location.  A condition will be required in order to ensure that the jetty is used solely for the
recreational purposes of the occupants of Rockhill Farm and not for any commercial
purposes. 
The applicant is also proposing additional landscaping and planting within the site seeking
to aid landscape value to the farm.  A Landscaping plan has been submitted in support of

Page 33

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
the application.  This plan is lacking in detail and however an augmented Landscaping
Plan can readily be secured via planning condition and has been requested by the
Biodiversity Officer.  Details of tree protection measures will also be required to be
submitted in order to ensure that the trees which are located along the boundary of the
eastern side of plot 7 are retained and maintained in order to assist with the integration of
proposed development within the surrounding landscape. 
5. Compliance with National and Local Development Plan 2 Policy 
Argyll and Bute ‘Local Development Plan 2’ (LDP2) was adopted on 28 February 2024
which, together with NPF4 which was adopted on 13 February 2023, represent the
Development Plan providing the policy background against which proposed developments
are assessed. 
The proposal is assessed against the relevant NPF4 Policies below which include details
of the associated LDP2 policies. 
5.1. NPF4 - Policy 1 – Tackling the Climate and Nature Crises 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it requires
to be applied together with other policies in NPF4. 
Guidance from the Scottish Government advises that it is for the decision maker to
determine whether the significant weight to be applied tips the balance in favour for, or
against a proposal on the basis of its positive or negative contribution to climate and
nature crises.   
In this case, given the small scale nature of the development proposed and its
alignment with all other relevant policies in NPF4 and those supporting policies in
the adopted LDP, it is considered that the development proposed would be in
accordance with the broad aims of NPF4 Policy 1 as underpinned by Policies 02
and 04 of pLDP2. 
5.2. NPF4 Policy 2 – Climate, Mitigation and Adaption 
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to minimise
lifecycle greenhouse gas emissions as far as possible, and that proposals will be sited
and designed to adapt to current and future risks from climate change. 
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis is on
minimising emissions as far as possible, rather than eliminating emissions. The Spatial
Settlement Strategy set out within LDP2  seeks to deliver sustainable levels of growth by
steering the majority of development to our existing settlements as these are where the
most of our current infrastructure, services, employment opportunities, housing and
community facilities are to be found, however LDP2 recognises that there are instances
where a different approach to significant development has to be taken particularly where
existing infrastructure or services are at capacity and where a more sustainable option
would be to provide new facilities elsewhere. 
It is considered that the proposed development would be consistent with Policy 2
of NPF4 having had due regard to the specifics of the development proposed and
to the overarching planning policy strategy outlined Policies 02, 04 and 09 of LPD2.

Page 34

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
5.3. NPF4 Policy 3 - Biodiversity 
NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver positive
effects from development and strengthen nature networks. 
The applicant has submitted a Survey for Otters & Birds and Potential Roost Assessment
for Bats, a Tree Plan and a Sustainability Checklist in support of the proposed
development. 
Scottish natural Heritage (SNH) have been consulted and have advised that the proposal
does not meet with their criteria for consultation. 
The Councils Biodiversity Officer has been consulted and has raised no objections to the
proposed development and has provided comments on each report which is as follows: 
Survey for Otters & Birds and Potential Roost Assessment for Bats
The findings of the surveys and the mitigation are acceptable.  The survey recommends
that if works do not begin within 18 months of the report then a survey for otter should be
repeated.  The proposed self catering units which were proposed to be sited near the
Loch and beside the watercourse at the eastern side of the site have been omitted from
the application and so it is considered that such a condition will no longer be necessary.
The Biodiversity Officer has provided advice with regards to working practices and
protocols for the developer to follow during construction works which will be added on as
a note to the applicant.  The Biodiversity Officer welcomes the addition of Barn Owl boxes
and bat boxes within the site. 
Tree Plan (4th of August 2021)
It is noted that one of the Ash trees (with signs of rotting and Ash die back) is
recommended for felling as it is considered dangerous – this is acceptable along with a
pre-felling survey for the presence of bats.  The tree protection proposal is acceptable.  I
advise that contractors are made aware and implement the plan prior to work
commencing.  A note to the application will be required to relay this advice. 
A Landscaping and Planting Plan has been submitted further to consultation with the
Biodiversity Officer.  This plan is lacking in detail and shows an element of tree planting.
Previous to this the Biodiversity Officer had advised that a Landscape Planting Plan could
be requested via a planning condition. 
The supporting Design and Access Statement states that the proposed development
seeks to embrace opportunities for biodiversity and a series of opportunities within the
application site have been identified with a view to delivering biodiversity benefits. 
Specifically, the proposals involve extensive areas of new landscaping and planting, as
illustrated on the enclosed plans. Our client has identified areas within the existing estate,
which will be enhanced by new plantings to connect with existing areas of habitat. It is
also proposed to introduce bat and swift boxes and ‘bug hotels’ to further support
biodiversity. 
With regards to the need in NPF4 Policy 3 to secure biodiversity improvements, it is not
considered that there are any issues of compliance with Policy 3.  No material biodiversity
impacts have been identified in the assessment of this application by the Planning
Authority. 
Notwithstanding the plans, supporting information and biodiversity checklist
submitted with the application, the Planning Authority is of the opinion that the
proposed development provides the opportunity to provide further biodiversity

Page 35

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
enhancement and protection could be delivered by planning condition which would
align with the broad aims of NPF4 Policy 3 and be consistent with the requirements
of LDP2 Policy 73, Development Impact on Habitats, Species and Biodiversity. 
5.4 NPF4 Policy 4 – Natural Places 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use of
nature-based solutions. 
Part (a) of Policy 4 states that development proposals which by virtue of type, location or
scale will have an unacceptable impact on the natural environment, will not be supported. 
Part (d) of Policy 4 states that development proposals that affect a site designated as a
local nature conservation site or landscape area in the LDP will only be supported where: 
i. Development will not have significant adverse effects on the integrity of the area
or the qualities for which it has been identified; or
ii.  Any significant adverse effects on the integrity of the area are clearly outweighed
by social, environmental or economic benefits of at least local importance. 
The proposed development is not within any designated European site of natural
environment conservation or protection, it is not located within a National Park, a National
Scenic Area a SSSI or RAMSAR site, or a National Nature Reserve. Neither is it located
within a site designated as a local nature conservation site or within an area identified as
wild land. 
The site is however located within a designated Local Landscape Area (LLA). LLAs are
designated to safeguard and enhance the character and quality of a landscape that is
valued locally or regionally.  The site is located within the North Argyll Local Landscape
Area (LLA) formerly known as the North Argyll Area of Panoramic Quality (APQ).  The
landscape at this location is predominantly rural in nature comprising of area of grazing
and and forestry, with no definitive settlement pattern.  Development is sporadic within
this landscape either being set along the B840 public road or the shores of Loch Awe. 
The Rockhill Farm Estate occupies a large area of ground which is undulating in form and
in many senses it is similar in nature to that of a low lying peninsula when viewed from
the west.  The whole of the Rockhill Estate is relatively well backdropped and well
contained within the surrounding landscape as it is set on the forefront of a large hill that
runs parallel to the Loch.   
A Design and Access Statement has been submitted in support of the proposed
development.  The site has been visited on a number of occasions as part of enforcement
investigations, the previously submitted application which has been withdrawn and the
current proposal which is the subject of this application.   A Sustainability Checklists and
Sustainability Buildings Checklist have also been submitted in support of the proposed
development.   
From the information which has been submitted it has been concluded by officers that no
further information is required in terms of landscape or visual impacts. The site is not a
highly visible within the landscape which has been demonstrated by the applicant and has
been experienced by Officers on the ground. 
Overall it is considered that the proposed development would be of an appropriate scale
to the natural and built surroundings and would integrate appropriately with the landscape
setting.  The development would be visually associated with the existing cluster of
development which is existing at Rockhill Farm.  The form of the proposed development

Page 36

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
would respect the surrounding built developments at the farm.  The site is not highly visible
from any key viewpoints with views being limited to long distance views from Loch Awe
which are framed in the site’s wider context.  The site when viewed from glimpsing long
tern views from the north is significantly backdropped as it is set against a large hillside
which is contained within a vast highland mountainous backdrop.  It is therefore the
considered opinion of the Planning Authority that the proposal will not result in any
significant adverse effects on the integrity of the area or the qualities for which it has been
identified. 
The proposed development is considered to be consistent with NPF4 Policy 4 and does
not conflict with Policy 71, Development Impact on Local Landscape Areas (LLA’s) 
5.5 NPF4 Policy 7 – Historic Assets and Places 
NPF4 Policy 7 seeks to protect and enhance historic environment assets and places, and
to enable positive change as a catalyst for the regeneration of places.   
Part (h) of Policy 7 states that development proposals affecting scheduled monuments
will only be supported where: 
i. Direct impacts on the scheduled monument are avoided;
ii. Significant adverse impacts on the integrity of the setting of a schedules
monument area avoided;
iii. Exceptional circumstances have been demonstrated to justify the impact on a
schedules monument and its setting and impacts on the monument or its setting
have been minimised. 
Policy 19 of the LDP2 sets out a presumption against development that does not retain,
protect, conserve or enhance a Scheduled Monument and the integrity of its settings.
Developments that have an adverse impact on Scheduled Monuments or their settings
will not be permitted unless there are exceptional circumstances. New development on
sites affecting the settings of scheduled monuments must respect their architectural,
historic and other special qualities and conform to the national policies and guidance
including but not limited to the ‘Related Documents’. 
The developer is expected to satisfactorily demonstrate to the planning authority that the
effect of a proposed development on a scheduled monument and its wider setting has
been assessed and that measures will be taken to protect, conserve and where
appropriate enhance the special interest of the asset. The use of appropriate setting
analysis, design statements, character appraisals and conservation plans are expected
to facilitate this assessment. 
Part (o) of Policy 7 states that non-designated historic environment assets, places and
their setting should be protected and preserved in situ wherever feasible. Where there is
potential for non-designated buried archaeological remains to exist below a site,
developers will provide an evaluation of the archaeological resource at an early stage so
that planning authorities can assess impacts. Historic buildings may also have
archaeological significance which is not understood and may require assessment.  Where
impacts cannot be avoided they should be minimised. Where it has been demonstrated
that avoidance or retention is not possible, excavation, recording, analysis, archiving,
publication and activities to provide public benefit may be required through the use of
conditions or legal/planning obligations. When new archaeological discoveries are made
during the course of development works, they must be reported to the planning authority
to enable agreement on appropriate inspection, recording and mitigation measures.

Page 37

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
There is a Scheduled Monument known as Rockhill Farm crannogs, 750m North East and
200m North of comprising the remains of two crannogs off the southern shore of Lochawe.
The monument is of national importance because the two crannogs, being waterlogged,
are likely to be rich in archaeological information relating to their construction and usage.
In addition they are part of a large group of crannogs in Loch Awe which together can tell
us more about social organisation of the time than any site viewed in isolation.   
There is also a cairn which is located to the west of the application site which is also a
Scheduled Monument.  This monument survives as a large artificial mound 16m in
diameter which is characteristic of prehistoric burial cairns around Loch Awe, situated in
a prominent position commanding views across the loch.  Like similar monuments nearby,
it shares a visual relationship with other cairns around the loch and nearby areas of good
agricultural ground. 
Historic Environment Scotland (HES) have been consulted and have not raised any
objections to the proposed development.  Whilst not raising any objections HES have
made it clear that their decision not to object should not be taken as support for the
proposed development.  HES have advised that this planning application should be
determined in accordance with national and local policy on development affecting the
historic environment together with related policy guidance.         
HES in their response to the current planning application have advised that the extensive
comments that they provided on 31st of May 2021 for the previous planning application
ref 21/00361/PP at the site, remain valid and should be referred to.  This is with the
exception of the comments relating to Cottage C (plot 7), as the current application has
provided more information on this aspect of the proposal.  HES have advised that the
supplied visualisation of Cottage C (plot 7) from Rockhill Farm cairn is helpful,
demonstrating that this building, despite its size, would be tucked beneath the skyline
when viewed from the monument.  Therefore, while Cottage C would result in a
detrimental impact on the setting of the cairn, its impact would be lessened in this position.   
HES had advised in their response to planning application ref 21/00361/PP that the
crannog which is located 750m North East of Rockhill Farm would not be affected by the
proposed development.  HES advised that the proposed Loch Cottage (which has been
constructed at the site) would be positioned approximately 50m to the south of the part of
the monument 200n of Rockhill Farm.  This close proximity means that the proposed
development would be located in the sensitive views, south from the monument, over the
related agricultural ground at the loch edge.  Though single storey, the close proximity of
this building to the monument would result in a change to the setting of the monument. 
By changing the character of the area, this would detract from the crannog’s relationship
with the agricultural land to the south.  HES concluded that Loch Cottage and Cottage C
would detrimentally affect the settings of, respectively Rockhill Farm Crannog and Rockhill
Farm Cairn respectively and whilst the impacts caused by these elements do not raise
issues of national interest such that they would object. Loch Cottage now no longer forms
part of this application for Flood Risk reasons.  The additional information provided by the
applicant has demonstrated that any detrimental  impact that Cottage C may have (plot
7) on Rockhill Farm Cairn would be lessened in this position.   
HES in response to the current application have also advised that any proposed jetty
opposite Building 5 (Loch Cottage) would have a significant impact on the crannog’s
immediate setting, with the risk of subsequent physical impacts through passing boat
traffic. The current proposal does not include the provision of any jetty near the location
where Building 5 (Loch Cottage) was previously proposed and no longer forms part of this

Page 38

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
application.  HES have offered no comments with regards to the proposed floating jetty
which has been installed on the foreshore at the north western end of the site. 
The proposed development has been reduced in scale with three of the proposed self
catering units being omitted from the overall proposal.  The three units which have been
omitted from the proposal are Loch Cottage (which has been constructed at the site),
Loch View Cottage and Cottage B.  Both Loch Cottage and Loch View Cottage were the
units proposed to be sited near the foreshore of Loch Awe.  The omission of Loch Cottage
will ensure that the setting of the crannog monument will be preserved which addresses
some of the concerns raises by HES.  HES had not raised any concerns with regards to
Loch View Cottage.  The applicant has detailed in the supporting Design and Access
Statement that the alignment of Cottage C (plot 7) has been purposefully selected so only
the narrowest elevation is visible from the cairn, with the property designed to sit below
the skyline so that it does not protrude higher than the hill behind it. Furthermore, the
recessively coloured palette of materials is considered appropriate to the site’s rural
location, helping to ensure the integration of the proposed development into its
countryside setting, reducing visibility and prominence within views into the site,
particularly from Loch Awe.  It is considered that the applicant has demonstrated that
Cottage C (plot 7) will not have a direct on Rockhill Farm Cairn and that any detrimental
impact will be lessened in this position within the site. 
WOSAS have not offered comments in response to the proposed development.   
The proposed development aligns with NPF4 Policy 7 and does not conflict with Polic19
and 24 of LDP2. 
5.6 NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield, vacant
and derelict land and empty buildings, and to help reduce the need for greenfield
development. 
Part (a) of Policy 9 states that development proposals that will result in the sustainable
reuse of brownfield land including vacant and derelict land and buildings, whether
permanent or temporary, will be supported. 
Part (d) of NPF4 Policy 9 notes the need to conserve embodied energy in order to give
significant weight to the climate emergency as required by NPF4 Policies 1 and 2 and
therefore it sets out that demolition will be the least preferred option, but does not expressly
prohibit it.   In this regard, as the existing building is not currently a Listed Building, or
situated within a Conservation Area it does not benefit from any statutory protection which
would prevent its demolition. 
Policy 05 of LDP2 identifies that new development cannot be considered in isolation.  It
requires an intelligent response to its location, giving full consideration to the surrounding
environment in terms of infrastructure, land uses, available community facilities,
connectivity, the existing neighbourhood character, scale and density and views 
The development proposed by this application is considered to be development that will
facilitate the use of a derelict farm which is inhibited by a number of empty dilapidated
buildings largely on a brownfield site by virtue of the fact that it is a proposal seeking to
redevelop an existing dilapidated farmhouse and barn which form part of a cluster of
buildings within the Rockhill Farm Estate.  The additional 3 self catering units will be sited
in relatively close proximity to the farmhouse and barn on the land to the west.  The
applicant has advised that the sites which the proposed self catering units will be sited on

Page 39

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
have previously accommodated outbuildings/sheds.  These outbuildings/sheds have been
removed from the site.  In land use terms the proposed small scale tourism development
is compatible with the surrounding land use which is a farm which is the subject of tourism
diversification.  It is considered that the site presents an opportunity for development that
would embrace the existing characteristics, with the design complementing its
surroundings in terms of density, appearance, height, scale, masses and finishes. 
The proposed development aligns with NPF4 Policy 9 and does not conflict with
Policies 02 and 05 of LDP2. 
5.7 NPF4 Policy 12 – Zero Waste 
NPF4 Policy 12 seeks to encourage, promote and facilitate development that is consistent
with the waste hierarchy as defined within the policy document. 
Policy 63 of LDP2 requires the provision of waste management within development sites. 
Development is required to make effective land use and layout provision for the storage,
separation, recycling, composting and collection of waste with developers ensuring that
the minimisation of waste generated during construction and demolition by the production
of Site Waste Management Plans (SWMPs). 
The development the subject of this planning application seeks to secure permission for
the proposed redevelopment of barn and farmhouse to form self-catering tourist
accommodation together with erection of self-catering tourist accommodation (3 units),
installation of floating jetty, landscaping and associated infrastructure works. 
The supporting Design and Access Statement specifies that the proposals will seek to
utilise materials with a high recyclable content. Furthermore, the proposals incorporate
the use of prefabricated, demountable components to minimise site waste and to reduce
construction times.  A condition will be required to ensure that a SWMP is submitted 
Whilst this is a development likely to generate waste when operational, it will already
benefit from regular waste uplifts by the Council and will be expected to comply with our
adopted and enforced recycling and reuse strategy. 
The proposed development is considered to be in compliance with NPF4 Policy 12
and does not conflict with the requirements of LDP2 Policy 63, Waste Related
Development and Waste Management which seek to ensure that effective provision
for waste/recycling is provided within developments and the current proposal
would raise no issue of conflict should permission be granted. 
5.8  NPF4 Policy 13 – Sustainable Transport 
NPF4 13 seeks to encourage, promote and facilitate developments that prioritise walking,
wheeling, cycling and public transport for everyday travel and reduce the need to travel
unsustainably. 
The development is not considered to be a significant travel generating use or a proposal
where it is considered important to monitor travel patterns resulting from the development. 
The proposed development will utilise a private access track which is situated off the B840
East Lochaweside Road.  The supporting Transport Statement gives details of the
previous use of Rockhill Farm with the Farmhouse having functioned as an eight-bedroom
guesthouse between 1959 and 2019 accommodating up to 24 guests with the two existing

Page 40

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
self catering holiday cottages having been used for residential lettings and  as self catering
tourist accommodation.  The supporting Transport Statement also states that during this
time Rockhill Farm was also used for livestock rearing, agricultural grazing and as a stud
farm.  The applicant has submitted a letter from the previous owner of Rockhill Farm to
corroborate these claims.  The Area Roads Engineer has noted the content of the
supporting Transport Statement and the letter provided by the previous owner.   
The proposed development would result in a much less intense use of the site in terms of
vehicular traffic. There is a bus stop located at the Cladich road junction on the A819 
approximately 1.9 miles away from the junction at the B840 were Rockhill Farm takes its
access from..  There is also a train station at Dalmally which is located approximately 6.5
miles away from the Cladich road end.  There is therefore public transport facilities within
the vicinity of the proposal site which could reduce the need for transport sustainably. 
The supporting Design and Access Statement details that the proposal site connects into
an expansive network of walking routes, offering guests the opportunity to access the
countryside, with consequential health benefits.  The applicant has indicated in this
statement that it is their intention on making cycles available to visitor to provide them
with further active travel opportunities. 
The applicant has worked closely with the Roads Authority to agree the proposed access
regime to serve the proposed development which includes the provision of: upgrades to
the existing private access track (within ownership control of the applicant) with
intervisible passing places required at intervals of no more than 150m.Track width to be
a minimum of 3.7m. Level 2m verge/step off on one side of track required; Total length of
unpaved access track surface requires upgrade including grading/leveling of surface,
voids, potholes, rutting to be filled, levelled and compacted, using bituminous bound
material and regularly maintained as required; visibility splays measuring 53m x 2.4m;
parking and turning for two vehicles for each of the proposed self catering units; parking
and turning for three vehicles for the farmhouse and 2 for the barn conversion and the
provision of a turning head to Figure 18 of the Roads Development Guide to be provided
within the farm yard area. 
The requirement for the provision of a condition to secure visibility splays measuring 53m
x 2.4m at the junction with the public road will not be necessary.  These required visibility
splays are required to be maintained by the Council as Roads Authority under the Roads
(Scotland) Act 1984. 
Policy 32 of the LDP 2 requires active travel and recreation to be integrated in
developments from the wider design process.  The Land Reform (Scotland) Act (2003)
(LRSA) established rights of responsible access to most land and inland water for
everyone in Scotland, underpinning opportunities for active travel and recreation. The
council is required to protect public access rights to and along the foreshore for all non-
motorised users. Development proposals should safeguard and enhance active travel
routes in a manner that is appropriate and proportionate to the specific site characteristics
and the scale and impact of the proposed development on access issues. 
The Council’s Access Manager has been consulted and has raised no objections to the
proposed development subject to the requirement of an Access Plan via planning
condition.  An Access Plan should contain specification for all paths and gates, an
implementation plan and a habitable buildings Landscape Plan.   
With conditions to secure the requirements of the Roads Authority and the
Council’s Access Manager the proposed development is considered to be
consistent with the broad aims of NPF4 Policy 13 and is consistent with the
requirements of LDP2 Policies 32, 37, 39 and 40 of the LDP2.

Page 41

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
5.9 NPF4 Policy 14 – Design Quality and Place 
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed development
that makes successful places by taking a design-led approach and applying the ‘Place
Principle’. 
NPF4 Policy 14(a) details that development proposals should be designed to improve the
quality of an area whether in urban or rural locations and regardless of scale with Part (b)
affording support to developments where they are consistent with the six qualities of
successful places: Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable. 
Part (c) details that development proposal which are poorly designed, detrimental to the
amenity of the surrounding area, or inconsistent with the six qualities of successful places,
will not be supported. 
A statement addressing the six qualities of place has been submitted with the application
as follows. 
“Healthy - . In terms of creating a healthy and pleasant place, the proposed development
represents a significant investment by our client in Rockhill Farm and the proposed
development will enhance the environment of the farm estate. The proposed development
will afford visitors access to open space, supporting heathier lifestyles and our client’s
proposals actively promote connections to green spaces, including expanded woodland
planting, encouraging people to interact and connect with nature. 
Pleasant - In terms of creating a healthy and pleasant place, the proposed development
represents a significant investment by our client in Rockhill Farm and the proposed
development will enhance the environment of the farm estate. The proposed development
will afford visitors access to open space, supporting heathier lifestyles and our client’s
proposals actively promote connections to green spaces, including expanded woodland
planting, encouraging people to interact and connect with nature. 
Connected - In respect of connectivity, the proposed development is very much focussed
on active travel and seeking to reduce car dependency. The proposals connect into an
expansive network of walking routes, offering guests the opportunity to access the
countryside, with consequential health benefits. It is also our client’s intention to make
cycles available to visitors, providing guests with further active travel opportunities. 
Distinctive - The design, scale and massing of the proposed development takes account
of the application site’s setting, and the proposed materiality of the development is
consistent with site’s rural context and the recessively coloured palette of materials is
considered appropriate to the site’s rural location, helping to ensure the integration of the
proposed development into its countryside setting, reducing visibility and prominence
within views into the site, particularly from Loch Awe. 
Every step has been taken to minimise impacts on the landscape and the submitted
proposals largely involve the development of new tourist accommodation on the site of
existing and former agricultural outbuildings. Taken together with our client’s removal of
various redundant agricultural buildings, the proposals result in a net reduction in the
amount of built development at Rockhill Farm, something which will have a positive impact
on the local landscape. 
Adaptable - The proposed self-catering accommodation units are of modular construction
and can be repurposed for a range of alternative uses. For example, if needs were to

Page 42

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
change over time, they could be repurposed to support agricultural activities, they could
be converted to provide homes or indeed removed from the site and utilised elsewhere. 
Sustainable -. The proposed development incorporates specific design measures and
features that will minimise lifecycle greenhouse gas emissions and reduce climate change
impacts. 
The starting point for the project is to reduce energy demand wherever possible and the
following measures are proposed in this respect: 
• Good levels of natural daylighting will be ensured in the buildings, both to provide
occupants with natural daylighting and reduce the demand for artificial lighting
internally. 
• Passive solar design: Excessive solar heat penetration in summertime shall be
reduced through glazing specification, shading overhangs, and landscape shading. 
• Excellent fabric performance for new thermal elements and openings to reduce the
heat losses from the proposed building. 
In terms of designing to adapt to current and future risks from climate change, the potential
increases in temperature, wind speed and precipitation are expected to be
accommodated within the current structural tolerances of the proposed development’s
design. Furthermore, the following mitigation measures will be implemented to lessen the
impact of potentially significant climate effects on the proposed development: 
• Building design is intended to be tolerant of increased temperature and rainfall over
the design life; 
• Site activities during the operational phase will be suspended during extreme weather
events to mitigate against health and safety risks for site personnel and potential
damage to structures and equipment. 
In land use terms the proposed small scale tourism development is compatible with the
surrounding land use which is a farm which is the subject of tourism diversification.  As
detailed above the proposed development will be positioned suitably within the existing
topography whilst having respect for the Scheduled Ancient Monuments which are located
within the vicinity of the site.  The proposed replacement farmhouse and barn building will
be very similar in design and character as the former barn and farmhouse which is
proposed to be demolished.  The new self catering units will be contemporary in character
which will reflects the agricultural vernacular of the application site.  The scale of the
proposed development is small scale in nature and it is considered to be relatively low key
development that will respect and complement its surroundings.  Overall it is considered
that the proposed development will respect the existing character by taking opportunities
to reinforce and embrace this throughout the sympathetic redevelopment of an existing
dilapidated farm which presents an opportunity for diversification. 
The development the subject of this planning application is considered to be in
accordance with the broad aims of NPF4 Policy 14 and the sustainable siting and
design policies of LDP2 namely Policy 5, Design and Placemaking, Policy 08,
Sustainable Siting, Policy 09, Sustainable Design and Policy 10, Design: All
Development which, in summary, collectively seek to ensure that developments are
compatible with surrounding land uses, are sited sensitively within the landscape
making use of existing infrastructure, are of an appropriate scale, sustainable
design and finishes for their site; and ensure that no adverse visual or amenity
impacts arise.

Page 43

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
5.10 NPF4 Policy 18 – Infrastructure First 
NPF4 Policy 18 seeks to encourage, promote and facilitate an infrastructure first approach
to land use planning, which puts infrastructure considerations at the heart of placemaking. 
The application indicates the provision of a private water supply with a private drainage
system comprising a biodisc treatment plant proposed due to the lack of public drainage
infrastructure within the vicinity of the site.  Scottish Water have been consulted and have
advised that there is no Scottish Water Infrastructure within the vicinity of the proposed
development.  The Environmental Health Unit have been consulted with regards to the
proposed private water supply and have raised no objections subject to a suspensive pre-
start condition will be required to secure a report on the proposed private water supply to
ensure that it is sufficient to serve the proposed development and does not impact on
existing users of the same supply or adjacent supplies. The Council’s Building Standards
Service will apply sufficient control over the private drainage arrangements at Building
Warrant stage. 
With a condition to secure a report on the proposed private water supply, the
proposed development aligns with NPF4 Policy 18 and is in accordance with
LDP2 Policy 04, Sustainable Development, Policy 58, Private Water Supplies and
Water Conservation and Policy 60, Private Sewage Treatment Plants and
Wastewater Drainage Systems which seek to ensure that suitable infrastructure is
available to serve proposed developments and give support to private water
supply and drainage arrangements where connection to the public systems is not
available. 
5.11 NPF Policy 22 – Flood Risk and Water Management 
NPF4 Policy 22 seeks to strengthen resilience to flood risk and to ensure that water
resources are used efficiently and sustainably. 
As detailed at NPF4 Policy 18 above, the development the subject of this planning
application proposes a private water supply, the details of which will be sought by
planning condition.   
The northern portion of the site (the land on the banks of Loch Awe) is overlain by the
indicative limits of fluvial flooding as per the SEPA Future Flood Maps.  SEPA had
originally raised an objection to the proposed development when the application was
first submitted.  Three of the 6 originally proposed self-catering tourist accommodation
units have now been omitted from the application as a result of the objection raised by
SEPA.  SEPA had previously objected to the proposed development on the grounds that
three of the proposed self catering units were potentially at risk of fluvial flooding. 
SEPA have been reconsulted and have now withdrawn their previous objections as the
topographic information provided in the submitted Flood Risk Assessment (Doc ref RHF-
CDL-XXX-RP-C-10201, Appendix C, Page 22. Cundall.) demonstrates that all of the
proposed buildings in the site plan (Drawing No 20/001, February 2024) are outwith the
flood risk area as: 
• All proposed buildings lie on existing ground levels above the 1 in 200-year
plus climate change flood level of 42.32 m AOD for Loch Awe.
• The culvert on the burn to the east of the proposed development lies at
around 39 m AOD and the nearest proposed building lies at around 46 m
AOD.  As such, all of the proposed buildings are likely to be outwith the

Page 44

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
flood risk area resulting from a blockage at this culvert and / or out of bank
flow from the burn. 
SEPA have also acknowledged that the additional building shown on the topographic
map of the submitted FRA, in the north of the site which was not included in the proposed
plans which SEPA previously commented on, is a temporary premises used by
contractors while works are ongoing at Rockhill Farm. SEPA understand that this
temporary structure is not included within the proposed plans and does not form part of
the planning application.  SEPA have further highlighted that such a building at this
location would be unacceptable on the grounds of flood risk. 
The Flood Risk Assessor has also been consulted and has raised no objections to the
proposed development.  The Flood Risk Assessor has advised that the revised site plan
(dated February 2024) that has been submitted shows all of the proposed development
(re-development of the barn and farmhouses, and 3 new proposed self-catering units) to
be located on higher ground in the southern area of the site, and are hence outwith the
fluvial flood extent. The revised site plan is considered acceptable regarding flood risk. 
With regards to the management of rain and surface water at the site, this will be
controlled thorough a condition imposed on the grant of permission to secure a
suitable sustainable drainage system for the site. The proposal raises no flood
issues and aligns with NPF4 Policy 22 and LDP2 Policies 55, 58 and 60. 
5.12 NPF4 Policy 29 – Rural Development 
NPF4 Policy 29 seeks to encourage rural economic activity, innovation and
diversification whilst ensuring that the distinctive character of the rural area and the
service function of small towns, natural assets and cultural heritage are safeguarded
and enhanced. 
NPF4 Policy 29a and 29c provides direct support for development proposals in remote
rural areas that contribute to the viability, sustainability and diversity of rural
communities, including farms and diversification of existing businesses.   
The site lies within Rockhill Farm which also includes an operational tourism business. 
The proposed development seeks to further diversify the farm to further grow the tourism
business that will contribute to the vitality, sustainability and diversity of the surrounding
local community. 
In this regard, the proposed development is considered to adhere to NPF4 Policy
29 as underpinned by Local Development Plan Policy LDP 8, through the
provision of appropriate development that assists in supporting balanced and
sustainable rural populations. 
5.13 NPF4 – Policy 30 – Tourism 
NPF4 Policy 30 seeks to encourage, promote and facilitate sustainable tourism
development which benefits local people, is consistent with our net zero and nature
commitments, and inspires people to visit Scotland. 
Policy 30(a) supports tourism development in locations identified in the LDP with a
requirement in Part (b) of this policy for developments to take into account a number of
criteria.  The application has been accompanied by a supporting Design and Access
Statement which addresses each of the points in Policy 30(b) as follows.

Page 45

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
i. The contribution made to the local economy 
“Specifically, the proposals will make a positive contribution to the local economy,
creating a new type of offering for the locale, which will attract a new group of visitors to
Argyll and Bute, adding to overall visitor numbers. Employment will be supported by the
expenditure of guests outside the development and it is also anticipated that most guests
will be from outwith Argyll and Bute and therefore their spending will be additional to the
area.” 
ii. Compatibility with the surrounding area in terms of the nature and scale of
the activity and impacts of increased visitors 
“This submission and our client’s supporting information demonstrates that the proposed
self catering tourist accommodation is compatible with the surrounding area, in terms of
its scale and taking into account the modest level of activity that will be associated with
the proposals’*   
iii. Impacts on communities, for example by hindering the provision of homes
and services for local people 
*In terms of impacts on communities, our client is also keen to support and promote local
businesses; seeking to work with local producers and suppliers to support the proposed
development. A high-quality development of this type will also raise the profile of Argyll
and Bute, boosting the reputation of the area as a first-class tourism destination and
making a positive economic contribution to the area The proposals do not hinder the
provision of new homes and they do not give rise to any matters which would impact on
local communities. 
Our client is also keen to support and promote local businesses; seeking to work with
local producers and suppliers to support the proposed development. A high-quality
development of this type will also raise the profile of Argyll and Bute, boosting the
reputation of the area as a first-class tourism destination and making a positive
economic contribution to the area.* 
iv. Opportunities for sustainable travel and appropriate management of parking
and traffic generation and scope for sustaining public transport services
particularly in rural areas 
“.In terms of active travel, Rockhill Farm estate benefits from having a series of active
travel routes through the estate, which provide access to the countryside. These routes
are not impacted by the proposals and our client is keen to encourage access to the
countryside and the proposed development will provide an income stream which will
allow for further investment to be made, with potential benefits for access. To further
promote access to the countryside and active travel, our client intends to provide access
to cycles for guests, further encouraging active travel.” 
The development is not considered to be a significant travel generating use or a proposal
where it is considered important to monitor travel patterns resulting from the
development.  The site has an abundance of ground in which to provide adequate levels
as requested by the Area Roads Engineer.  As detailed in section 4.8 above the
proposed development would result in a much less intense use of the site in terms of
vehicular traffic

Page 46

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
v. Accessibility for disabled people 
“The proposal provide access to the natural environment and the proposals are
accessible for disabled people.” 
vi. Measures taken to minimise carbon emissions 
“Measures have been taken to minimise carbon emissions.” 
vii. Opportunities to provide access to the natural environment. 
“Our client has submitted evidence in respect of existing access routes which
demonstrates how these routes will be retained and integrated as part of the application
proposals.” 
Policy 23 sets out a presumption in favour of new or improved tourist facilities and
accommodation where: 
• The development is in a form scale and location which is consistent with its
surroundings; and
• The proposals respect and integrate well with the landscape/townscape
character and amenity of the surrounding area; and 
• They are located in accessible locations, taking into account the scale and
nature of the proposed development, and include proposals to widen the
options for sustainable travel to access them (including public transport,
cycling or on foot);and 
• They are well related to the existing built form of settlement areas or the
existing development pattern outwith the settlement areas and avoid
dispersed pattern of development unless the developer has demonstrated
a locational requirement based upon the need to be near to the specific
tourist interest being exploited and that the proposed development will not
undermine these interests. 
In land use terms the proposed small scale tourism development is compatible with the
surrounding land use which is a farm which is the subject of tourism diversification.  As
detailed above the proposed development will be positioned suitably within the existing
topography whilst having respect for the Scheduled Ancient Monuments which are
located within the vicinity of the site.  The proposed replacement farmhouse and barn
building will be very similar in design and character as the former barn and farmhouse
which is proposed to be demolished.  The new self catering units will be contemporary
in character which will reflects the agricultural vernacular of the application site.  The
scale of the proposed development is small scale in nature and it is considered to be
relatively low key development that will respect and complement its surroundings.  The
site is well separated from neighbouring residential properties and tourist offerings and
there will be no impacts on the existing levels of amenity. 
There is a bus stop located at the Cladich road junction on the A819  approximately 1.9
miles away from the junction at the B840 were Rockhill Farm takes its access from.. 
There is also a train station at Dalmally which is located approximately 6.5 miles away
from the Cladich road end.  There is therefore public transport facilities within the vicinity
of the proposal site which could reduce the need for transport sustainably 
Overall it is considered that the proposed development will respect the existing character
by taking opportunities to reinforce and embrace this throughout the sympathetic

Page 47

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
redevelopment of an existing dilapidated farm which presents an opportunity for
diversification. 
It is therefore considered that the site would present a suitable location for a small-scale
tourism development that would meet the needs of the applicant and contribute to the
local economy whilst respecting the existing rural community and surrounding natural
and built environment. In this regard, the development would be in accordance with the
provisions of NPF4 Policy 30 as underpinned by Local Development Plan Policies LDP
5 and LDP 9, supplementary guidance SG LDP TOUR 1, and Policy 23 of the proposed
Local Development Plan 2. 
6. Public Representations 
6.1  At the time of writing this report, representations had been received by the Planning    
Authority from 50 respondents in relation to this planning application, 44 respondents
raise objection and 6 raise support.  A petition has also been submitted in response to
this application objecting to the proposed development. 
7. Conclusion 
7.1  The development proposed by this application is considered to be development that will
facilitate the use of a derelict farm which is inhibited by a number of empty dilapidated
buildings largely on a brownfield site by virtue of the fact that it is a proposal seeking to
redevelop an existing dilapidated farmhouse and barn which form part of a cluster of
buildings within the Rockhill Farm Estate.  The additional 3 self catering units will be
sited in relatively close proximity to the farmhouse and barn on the land to the west.   
The site is located within the designated CA within an LLA and has been supported  by
supporting information (including a Design and Access Statement) which has led officers
to conclude that no further information is required in terms of landscape or visual impacts.   
It is the considered opinion of the Planning Authority that the proposal will not result in
any significant adverse effects on the integrity of the surrounding LLA area or the qualities
for which it has been identified. 
No objections have been received from consultees with regards to the proposed
infrastructure to serve the proposed development. 
The proposed development is considered to be consistent with the provisions of both the
adopted National and Local Policy with the issues raised by third parties not amounting to
material planning considerations that have not been addressed through the processing of
the planning application. 
Accordingly the application is recommended for approval subject to conditions.