NORTH AYRSHIRE COUNCIL 
6th May 2025 
Cabinet
Title: Proposals for Community Investment Fund (CIF)
Expenditure
Purpose: To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects.
Recommendation: That Cabinet:
a) Reviews the applications from Garnock Valley, North
Coast and Cumbraes and Three Towns Locality
Partnerships in line with CIF criteria; and
b) Approves the CIF application in relation to
Radio City Association (see Appendix 1)
c) Approves the CIF application in relation to
Clyde Coast and Cumbraes Men’s Shed (see
Appendix 2); and
d) Approves the CIF application in relation to the
Three Towns Growers (see Appendix 3). 
1. Executive Summary 
1.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they have
identified through Local Planning Partnerships and within the context of North Ayrshire
Community Planning Partnership’s Fair for All Strategy and the Council’s Community
Wealth Building Strategy. In June 2021, Cabinet approved a further £1m top-up for the
funding, with a further £2m added in November 2021. 
1.2 Locality Partnerships have subsequently continued to work on their local action plans
and refining proposals for expenditure in line with their locally identified needs. It is a
testament to the dedication of the Locality Partnerships and their community partners
that proposals continue to emerge to provide creative approaches to addressing local
challenges. 
1.3 This report brings forward proposals which respond to the specific needs of the local
community, and which have been developed based on local circumstances and
opportunities.
2. Background 
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they have
identified through Locality Planning Partnerships and within the context of North Ayrshire
Community Planning Partnership’s Fair for All Strategy and the Council’s

Page 2

Community Wealth Building Strategy. A further £3m was added to the funding in 2021,
to be distributed among localities as follows: 
Locality Value of
CIF from
first
funding
allocation
(2017-18)
Expenditure
to date
Value of
CIF from
second
funding
allocation
(June
2021)
Value of CIF
from third
funding
allocation
(Nov 2021)
Total balance
available
Irvine £754,000 £958,358 £290,000 £580,000 £665,642
Kilwinning £286,000 £322,190 £120,000 £240,000 £298,810
Three 
Towns
£598,000 £1,194,411 £240,000 £480,000 £123,589
Garnock
Valley
£390,000 £456,103.04 £150,000 £300,000 £383,896.96
North Coast £468,000 £688,717 £170,000 £340,000 £289,283
Arran £104,000 £125,079 £30,000 £60,000 £68,921
TOTAL £2,600,000 £3,744,858.04 £1,000,000 £2,000,000 £1,830,142.96 
2.2 It was agreed that the CIF awards would range between £5,000 and £100,000 for
community organisations, as defined in the CIF guidance, in order to support
proposals and projects that connect with: 
• The North Ayrshire Fair for All Strategy, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and locality priorities;
• North Ayrshire Council’s values, priorities, and business objectives; and
• The Community Wealth Building and Environmental Sustainability and Climate
Change Strategies 
And will also:
• Fulfil a compelling need and not duplicate existing services or facilities.
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in
their way of addressing community challenges and in their request to Locality
Partnerships and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon requests) and efficiently and effectively managed. This can
include an organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and
volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular
basis.

Page 3

2.3   The proposal development and application process has been agreed as follows: 
• Locality Partnerships should continue to engage with their communities and
stimulate interest in the CIF. Each Locality Partnership will then strategically access
the applications, make links, and look at the funding ‘in the round’.
• If the partnership supports a bid, then the group will be encouraged to submit a full
application form, which they will decide upon before making a proposal to Cabinet
for final approval.
• The proposal will go to the next suitable Cabinet for final approval. 
2.4    The enclosed applications at appendices 1, 2 and 3 have been developed by community             
partners and North Ayrshire Council officers and are now recommended for approval by           
Cabinet. Each application is summarised in turn below. 
2.5   The Garnock Valley Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Garnock Valley Locality Partnership CIF
allocation to date:
£840,000
Garnock Valley Mens Shed - Project Initiation £28,000
Travel Needs Analysis £25,000
Geilsland Hall - Volunteering and Employability £45,000
Garnock Valley 20:20 Vision £15,000
Beith Community Development Trust - Youth
Lead  £43,500
Garnock Valley Mens Shed - Heating System
Replacement  £20,000
Café Solace - Development Worker £49,723
Geilsland Courtyard Feasibility Study £15,582
Beith Playpark £100,000
Beith Community Association £22,098.04
Garnock Valley 2023 Development Worker £51,200
Beith Hive £41,000 
Balance 
£383,896.96 
2.6    Proposal: Radio City Association (£65,000) (see Appendix 1) 
2.6.1 Radio City Association are a longstanding community anchor organisation that was
formally established in November 1999. Their overall objective is developing the social,
environmental and economic prospects of the Garnock Valley. The vision that has been
established for Radio City’s ‘Electric Valley’ is to develop a vibrant community of
partnership, growing opportunities for lifestyle change across health, learning and
employability to enable inclusive economic growth and sustainability.

Page 4

2.6.2 The proposal aims to advance wind and hydro energy projects and initiate stage one of
their Knox Institute project. RCA’s Electric Valley concept, with its seven areas of focus,
targets strategic investment funds to foster inclusive economic growth and address local
inequalities in health, wealth, and education. The £65,000 funding will support the
employment of a Community Development Manager and a Project Manager within the
organisation as well as make a small contribution towards overhead costs. CIF funding
will boost RCA’s organisational capacity, enabling broader community development
through partnerships and access to additional funding streams. 
2.6.3 The project supports the locality priorities of Moving Around, Work and Local Community
and Facilities and Amenities, as well as the Local Outcome Improvement Plan outcomes
of Work and World. A full application is provided at Appendix 1. 
2.7 The North Coast and Cumbraes Partnership 
The allocation and funds committed to date are outlined in the table below. 
The North Coast & Cumbraes Locality Partnership CIF
allocation to date
£978,000
Organic Growers of Fairlie £22,800
Clearer Minds £30,200
Millport Town Hall £200,000
Sing Your Song (WKCIL) £14,892
Locality Priorities Worker £35,948
West Kilbride Technical & Creative Training Programme £76,605
Locality Priorities Worker - extension of support £41,871
West Kilbride Sports Club £6,750
Largs Scottish Women’s Institute £15,393
Locality Priorities Worker - extension of support £52,000
Parent Network Scotland £99.393
Largs Development Trust £92,685 
Balance  £289,283 
2.8 Proposal: Clyde Coast and Cumbraes Men’s Shed (£47,500) (See Appendix 2)
2.8.1 The main aim of the Clyde Coast & Cumbraes Men's Shed is to help improve men’s
mental & physical health and wellbeing by providing a venue where men can choose to
either work, relax, make and repair things, pursue hobbies and pastimes, get practical
help with projects and share & learn new skills, while making new friends. They are a
registered charity and are in the process of concluding the legal aspects of the
Community Asset Transfer (CAT) purchase of the Brisbane Centre, as previously
approved by Cabinet. 
2.8.2 The purpose of their application is to carry out alterations to the Centre which would
provide a spacious workshop area, improved storage, modern disabled and unisex
toilets, new staircase with stair lift to upper floor, new office and craft room/meeting room.
This would create a friendlier and more usable venue for those using the facility. 
2.8.3 The Men’s Shed application is attached as Appendix 2. They had applied for £95,000 in
total. The Locality Partnership agreed to:

Page 5

• 50% of the funding requested by Men’s Shed, with funds ringfenced for 12 months
and subject to review after that period to allow the organisation to raise the remaining
50% via other funding avenues.
• Request that the organisation obtain and share a full quote for the project work with
the Partnership.
• Release funds from ringfenced funding to support tendering efforts to advance the
project. 
Cabinet is therefore asked to approve the award of £47,500 to the group. 
2.8.4  The project meets the locality priorities of Increasing Social Inclusion and Improving       
Mental Wellbeing, as well as the LOIP priority of Wellbeing. 
2.9 The Three Towns Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Three Towns Locality Partnership CIF allocation to date: £1,318,000
Ardrossan Community Development Trust £25,000
Three Towns Growers £100,000
The Training Station £50,000
Ardrossan Castle Heritage Society £17,912
Raise Your Voice For Ardeer £100,000
Ardrossan Community Sports Hub £43,320
Winton Circus Playpark £48,288
Ardrossan Community Development Trust - Development Officer £53,100
Raise Your Voice For Ardeer – increased cost for multipurpose hub) £130,000
Ardrossan Community Association (Whitlees) 
£48,586
Ardrossan Community Sport - Winton Park 3G £100,000 
CHAP – Advice Outreach
£45,767
Ardrossan Scouts £100,000
Saltcoats Active Lifestyle Group (SALT) £45,600
Stevenston Community Council – Street Signage £29,988
Three Towns Community Shed £56,850
Hayocks Tenants and Residents Association Project – funding
ringfenced by Locality Partnership while match funding sought.  £100.000
Ardrossan Winton Rovers – Stand Roof £100,000
Balance £123,589 
2.10 Proposal: Three Towns Growers (£49,240) (See Appendix 3) 
2.10.1 Three Towns Growers (3TG) are an OSCR registered charity. 3TG provide growing
spaces to cultivate fruit & vegetables, social interaction and community involvement.
Their aim is to nurture people to live a healthier and more sustainable lifestyle. 
2.10.2 The group are seeking CIF funding to support the building of their Community and      
Education Hub at their allotment site. The group and their members have through a
range of fundraising events, raised £30,000 to support this development, as well as
secured £383,000 of Lottery funding towards it. The funding will enable the schedule
of works to proceed, which will include, a decking area, timber pergola, textured
asphalt surfacing to road and the establishment of disabled parking

Page 6

bays. All the work is within their current lease and meets all NAC requirements. The
Hub will host a range of activities such as a farmers’ market, the Grower’s public events
held throughout the year, a place for community members to come together and take
an interest in local ecology, becoming climate aware, and events and activities that
promote positive mental health and wellness. It will also provide a learning space to
support the partnership the growers have with local schools. 
2.10.3 As referenced in the full application approved by the partnership (attached as
Appendix 3), the group have previously received an award of £100,000 from CIF to
support the employment of a member of staff.  The amount applied for currently as a
contribution towards the increased costs of their build project supports the locality
priorities of promoting the local economy and tourism, regenerating community
facilities, increasing civic pride and community engagement and improving
community wellbeing, as well as the LOIP priorities of World and Wellbeing.        
3 Proposals 
That Cabinet:
a) Reviews the applications from Garnock Valley, North Coast and Cumbraes and Three
Towns Kilwinning Locality Partnerships in line with CIF criteria; and
b) Approves the CIF application in relation to Radio City Association (see Appendix 1)
c) Approves the CIF application in relation to Clyde Coast and Cumbraes Mens’ Shed (see
Appendix 2); and
d) Approves the CIF application in relation to The Three Towns Growers (see Appendix 3). 
4. Implications/Socio-economic
Duty Financial 
4.1 CIF funding is allocated within existing resources. 
Human Resources 
4.2  None.
Legal 
4.3 None. 
Equality/Socio-economic 
4.4  The purpose of Locality Planning is to reduce inequalities, increase community  
cohesion an advance community empowerment. Each of the CIF proposals is tested       
against that purpose before being presented to Cabinet. 
4.5    Climate Change and Carbon 
Environmental and sustainability along with climate change and carbon reduction      
opportunities are considered in relation to each CIF application. This proposal
supports recycle and re- use principles.

Page 7

Key Priorities 
4.6  The proposals contained within the report support the North Ayrshire Council       
Plan strategic aims: 
 To transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people.
 We will have active, inclusive, and resilient communities.
 A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 The application supports the following pillars of community wealth building: 
• Financial Power: Listening to communities and local enterprises to
maximise the impact of financial investment and grow local business,
enhance innovation and empower communities.
• Land and Assets: Maximising the function and ownership of local
physical assets for the benefit of communities and enterprises. 
5 Consultation 
5.1 The proposals contained within this report have been developed by the
Locality Partnerships, through consultation with local people, including
young people. 
David W. Hammond
Executive Director (Communities and
Housing) 
For further information please contact Rhonda Leith, Head of Service
(Connected Communities), on 01294 324415. 
Background Papers
Appendix 1: CIF Application Radio City Association
Appendix 2: CIF Application Clyde Coast and Cumbraes Men’s Shed
Appendix 3: CIF Application Three Towns Growers

Page 8

The CIF will support proposals and projects that:
• Connect with:
o the Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities, and stimulate interest in the
CIF. The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible: 
Christina Pieraccini
Locality Officer - Garnock Valley
Connected Communities
North Ayrshire Council
Walker Hall
45, Main Street
Kilbirnie
KA25 7BX 
Tel: 01505 680203
Mob: 07966 160854
Email: cpieraccini@north-ayrshire.gov.uk 
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 9

1. Details of your organisation 
Name of Organisation
RADIO CITY ASSOCIATION 
Postal Address for Correspondence
Click or tap here to enter text. 
Name of Contact Person ALLAN WILSON
Position in Organisation DIRECTOR
Telephone Number
Email Address Click or tap here to enter text. 
Total amount of funding requested: £65,000
Match funding (if any): 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence. 
Radio City Association (RCA) is a longstanding community anchor organisation that
was formally established in November 1999 following the establishment of a steering
group in 1997 to redevelop the historic art-deco style Radio Cinema building. RCA is
an OSCR registered charity (SCO42718), with the overall objective of developing the
social, environmental and economic prospects of the Garnock Valley.
In July 2002 after raising c.£2.5m from a wide variety of partner sources, both public
and private, construction commenced to convert Radio City from a derelict former
cinema opening in December 2003. Having operated the facility for over 16 years the
building was sold to Aspiris (Priory Group) to serve as a school facility for children
with additional support needs living in seven local residential facilities. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 10

This allowed Radio City Association to further our charitable objectives of becoming
an enabler of local development and allowed the development of the Electric Valley
Project.
The vision that has been established for Radio City’s Electric Valley is to develop a
vibrant community of partnership, growing opportunities for lifestyle change across
health, learning and employability to enable inclusive economic growth and
sustainability with 12 key areas of focus underpinned by the UN Sustainable
Development Goals and National Performance Framework to allow alignment with
public policy. (see Community Appendix 1 )
The ongoing project delivery of Radio City is that of community involvement and
participation linked to ongoing community development operating a variety of
projects ranging from sustainable transport, poverty reduction, skills and
employability. 
We attach Job outlines for the posts. As per those outlines, these are developmental
posts for our organisation in a restructured management team that will build upon
our recent success in securing capital funding for our Community owned WTG –
currently under construction – and repeat that success with our proposed
Community Hydro Scheme, being developed in partnership with Scottish Water in a
unique collaboration. They will also oversee the development of our Community
owned and operated Café/ Bistro within a redeveloped Knox Institute ground floor let
and the Community Asset Transfer of the entire building to RCA’s ownership. 
These, therefore, are our projected outputs and expected outcomes from this
investment and its impact will see a currently disused building at the heart of our
community brought back into productive use in a bold development to replace
community decay deterring inward investment with innovation and renewal that will
instead attract investment. 
This CIF Application – as per the above – is to further develop our local charity in our
25th year of operation and create employment and training opportunities for local
people in line with our founding Articles of Association that created the Radio City
School, - £2.5m inward investment - now operating as a standalone facility hosting
80 jobs. 
We have included details of our projected income stream from the WTG that will see
upwards of £10m -12.5m re-invested back into our community over the lifetime of its
operation – including into the Knox Institute – creating a self-sustaining facility long
after the Funding from the Community Investment Fund has been utilised to help 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 11

kick start this development. This income will be in addition to that earned from
existing activities see ‘cashflow projection’ 
As per the above, we are in the process of adding to our existing Community Interest
Company (ATTIX CIC) the SPV that is developing the WTG with other operating
companies for each of our projects under development in line with good Scottish
Investment Fund (SEn) practice. 
This restructuring provides for strategic oversight of these varied projects and
responsibility for reporting to the Board on Progress on a monthly basis on our Active
Transport department and Renewable Energy Project developments within our
overall drive towards Net Zero by 2030 in line with Scottish Government targets. 
The opening of our ‘Climate Café’ will also require oversight and strategic direction in
line with our drive to Net ZERO as provided for in this application in respect of the
job outlines contained here in.(see below). 
On the supplementary Questions from the GVLPP ‘Working Group’, re FT and PT
staffing in the Café it should be noted that these are very provisional estimates at
this stage based on current modelling and our demand profiling, undertaken several
months ago and we have updated them in line with developments in the interim e.g.
the Closure of Irvine’s Bakers across the road. It also doesn’t feature in our CIF
application per se but is provided on request for context and in relation to the role for
the proposed Community Development Manager for his/her strategic oversight of all
operations. 
Part-Time is classified by UK employment contract law as those working less than 35
hours. Therefore, almost all staff would be classified as ‘part time’.
Executive Chef x1 - 40 Hours (FT)
Sous Chef x1 - 35 Hours (FT)
Chef de Partie x1 - (PT)
Commis Chef x1 - (PT)
Kitchen Porter x1 - (PT)
Hospitality Manager x 1 (PT)
Barista x 2 - (PT)
General Service (internal and external) 1- 3 based on individual (PT) 
+2 LEP (explained below) - (PT)
Total 4 - 6.66 FTE 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 12

On the supplementary question re’ funding being in place for the Cafe staff’, you will
be aware, (as above) that this is not part of our CIF application although our Job
Outline 1 includes oversight of its operation. As reported, we envisage the earnings
from Cafe would cover costs after a period of time as per our business plan but there
is funding in place to cover initial staffing costs and of course, we have provided
projected revenues from our WTG that is available to cross subsidise if we choose to
do so over the short to medium term. 
All staff will receive living wage with revenues required to meet the costs of staff on
an ongoing basis with no revenue support covering core staff for administrative and
operational functions of cafe and wider organisation which is required from CIF. 
Funding is in place for 2 positions for people in 10% SIMD postcodes in Kilbirnie and
Dalry covered via our participation as a Local Employability Partnership (LEP)
provider of employability services on behalf of North Ayrshire Council each at 14
hours per week . It is to be determined if both these roles will be in café and that will
be decided by the people enrolled in programme in their best interest and in the
knowing their individual skillset to support their employment progression and long
term employability, meaning alternate roles within organisation can be considered .
The previous employment experience and skills of these individuals may be limited
due to their background with their training supported by RCA via LEP for 4 months,
following which their wages would require to be supported by revenue or securing of
additional funding. 
Prospectively 2 further positions for individuals currently in receipt of Universal Credit
aged 16-24 covered with 50% wage support via Person Recruitment Incentive (PRI)
for young people via the Ayrshire Skills Investment Fund (ASIF) each at a minimum
of 25 Hours. Again, the skills of those recruited may be limited and will require
oversight and administration and ongoing support for their personal and professional
development from senior staff. 
This proposal, therefore, is entirely compliant with CIF Funding Guidance and the
RCA’s ‘Electric Valley’ Development is recognised nationally as such. 
See following selected News Coverage of our Funding Announcement heralding
our WTG development now in construction and nearing completion. 
• https://www.ardrossanherald.com/news/23857953.kilbirnie-wins-5m-backing-
community-owned-turbine/?ref=rss 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 13

• https://www.heraldscotland.com/politics/23858722.renewable-energy-
community-ownership-way-forward/?ref=rss
(also in print) 
• https://www.scottishhousingnews.com/articles/scottish-community-to-build-
first-subsidy-free-community-owned-onshore-wind-turbine 
• https://www.rechargenews.com/wind/small-town-has-big-plans-for-its-very-
own-wind-turbine-after-7m-finance-boost/2-1-1536418 
• https://www.energylivenews.com/2023/10/17/scottish-community-raises-5m-
for-pioneering-wind-turbine/ 
• https://www.futurenetzero.com/2023/10/17/scottish-community-raises-5m-for-
pioneering-wind-turbine/ 
.
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 14

3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for.
Please include:
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
**Overview: Addressing the Challenges in Garnock Valley** 
Garnock Valley is confronting significant challenges that hinder inclusive growth and
the development of a sustainable local economy. These challenges, outlined in detail
in the attached Electric Valley socio-economic analysis, can be broadly summarized
as follows: 
1. **Declining Youth and Working-Age Population**: The area is experiencing a
decrease in its young and working-age population, leading to overall population
decline and reduced economic activity. 
2. **Aging Population**: With an increasingly aging demographic, there is growing
demand for health and well-being services, further straining public resources. 
3. **Economic and Social Recovery from Industrial Decline**: The closure of
Glengarnock Steelworks in the 1980s triggered a loss of employment and economic
downturn, resulting in heightened social exclusion. 
4. **Perceived Neglect of the Garnock Valley**: The community widely perceives that
investment is disproportionately directed to other areas of North Ayrshire,
exacerbating feelings of neglect. 
5. **Gross Inequalities in Health, Wealth, and Education**: The area faces severe
public health challenges, economic disparity, particularly in household income and
female employment, and low educational attainment—all of which contribute to the
persistent wealth gap. 
**Strategic Response: Community Wealth Building and the Electric Valley Initiative** 
In response to these ongoing and pervasive issues, RCA has developed a
Community Wealth Building strategy through the Electric Valley initiative. This 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 15

project serves as a reference model for how a "Just Transition" can be both
equitable and beneficial to the community, driving economic and social change
through tangible actions. 
The Electric Valley represents an innovative approach designed to address future
challenges posed by technological development and decarbonization. This initiative
is also aimed at tackling long-standing issues that have hindered inclusive economic
growth and perpetuated social injustice in the Valley for decades. 
**Community-Centric Approach to Green Economy Transition** 
The Electric Valley is not just a proposal; it is a bold strategy ensuring that the
transition to a green economy benefits the entire community, particularly those who
have historically been marginalized. This initiative differs materially from past
commercial promises, emphasizing the development of community-owned
renewable energy schemes. These schemes, which are 100% community-owned,
mark a turning point for the local economy, with the potential to transform lives,
create new opportunities, and address underlying social problems. 
**Visionary and Radical Approach to Addressing Challenges** 
The magnitude of the challenges faced by Garnock Valley requires a radical vision,
which is why RCA has developed the Electric Valley strategic investment plan.
Support from the Community Investment Fund (CIF) will be instrumental in
transforming these strategic plans into actionable business and implementation
plans, particularly for the development of energy schemes. 
Achieving a "Just Transition" requires a community-led effort, ensuring that
improvements such as better air quality and the eradication of fuel poverty are
accessible to all, regardless of personal wealth. The Electric Valley presents a
realistic prospect for creating a new local, social economy, grounded in community
wealth building. 
**Collaborative Effort and Community Engagement** 
The success of the Electric Valley will hinge on collaboration with local institutions
and community anchors. This initiative is designed to be scalable and could serve as
an exemplary project demonstrating how communities can effectively tackle the
challenges they face. Importantly, the Electric Valley aligns with the priorities of the
local community, as well as the strategic plans of both the council and national
governments. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 16

**Creation of a Community Benefit Fund** 
A key outcome of this initiative is the creation of a community benefit fund, guided by
Scottish Government recommendations. This fund, indexed to inflation, will support
local individuals, voluntary organizations, and community groups through a micro-
grant scheme. Additionally, a separate benevolent fund will be established to support
new enterprise schemes, reinforcing this novel approach to community ownership of
renewable energy. 
**Long-Term Impact and Community Resilience** 
This project is not a short-term endeavour with limited outcomes; it is a long-term
initiative designed to deliver lasting benefits to the community for generations. By
building greater resilience, the Electric Valley will enable the community to face
future challenges head-on, addressing underlying issues like economic disparity and
inequalities in health and education outcomes that have hindered inclusive growth in
Garnock Valley for decades. 
4. What difference will this project make within the locality and to local
services and programmes? 
Please include:
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Moving
Around (Public Transport, Traffic and Parking) 2. Work and Local Community
3. Facilities and Amenities 
**Summary:** 
The proposal aims to advance wind and hydro energy projects and initiate stage one
of the Knox Institute project. RCA’s Electric Valley concept, with its seven areas of
focus, targets strategic investment funds to foster inclusive economic growth and
address local inequalities in health, wealth, and education. 
The development of microgrant community funds will empower individuals, support
local organizations, and enhance community well-being. CIF funding will boost 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 17

RCA’s organisational capacity, enabling broader community development through
partnerships and access to additional funding streams. 
The Electric Valley proposal aligns with the council's Fair-For-All Strategy,
particularly in reducing inequalities, and supports the broader Community Wealth
Building Strategy. It offers a scalable model for grassroots community wealth
development, serving as a potential case study for other communities. 
The proposal also addresses North Ayrshire Council's climate emergency
declaration, positioning the Electric Valley as a leader in local action against climate
change and ensuring a "just transition" to a decarbonized economy. 
**Locality Priorities:** 
1. **Moving Around (Public Transport, Traffic, and Parking):**
- Establish an Active Travel Hub within the Knox Institute.
- Support a shift to sustainable transport, including electric vehicles and cycling
initiatives.
- Provide community grants for transport access, such as driving lessons and
public transport support. 
2. **Work and Local Community:**
- Offering of workforce development opportunities with new apprenticeship places
and works in partnership with Ayrshire College.
- Create a community forum to foster local creativity and skill development.
- Generate local jobs, new enterprises, and support community grants for skills
development and well-being. 
3. **Facilities and Amenities:**
- Redevelop the Knox Institute as a community facility, leveraging CIF funding for
additional support.
- Develop projects in Beith, Dalry, and Valefield to enhance local facilities and
community capacity. 
This proposal is a long-term, strategic initiative designed to build community
resilience, tackle persistent local issues, and prepare the Garnock Valley for future
challenges. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 18

5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
The development of the Electric Valley project has involved extensive and ongoing
community engagement with the Garnock Valley Community at a multitude of
meetings and events, demonstrating a strong commitment to incorporating feedback
from a wide array of stakeholders. Consultations have been comprehensive,
involving public meetings, interactions with local community groups, government
bodies, voluntary organisations, schools, businesses, and other institutions. 
Over several years, the project has engaged with local representatives, regional
stakeholders, and numerous organisations at various levels. Meetings have been
held with community groups, local council, GVLPP and public sector to discuss the
project's vision, gather feedback, and address issues. The project has also fostered
collaborations with educational institutions, health services, and social enterprises to
ensure broad-based support and community involvement. 
A public petition garnered substantial backing (over 500 signatories in support) with
over 100 individuals writing in support of the project to planners. In addition,
numerous consultation events have been conducted to ensure community voices are
heard. The project has worked with local businesses, third-sector organisations, and
the farming community to explore how the Electric Valley can support local economic
development. 
Overall, the project's engagement strategy highlights its dedication to integrating
community input, ensuring the Electric Valley initiative is shaped by and benefits the
local community, working to develop a concept of co-production in the considerable
reinvestment proposed from the Electric Valley. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 19

6. How will the project be managed? 
Please include: 
• How the finances will be managed
• Does the proposed project contribute to volunteering or employment
opportunities in the Garnock Valley? Please include the number of
volunteering opportunities and employment opportunities
• If there are any staff requirements, please outline your HR plans 
Project Management and Oversight 
The Electric Valley project will be managed by the Radio City Association (RCA)
Board of Trustees, a group with extensive experience across various sectors,
including skills development, civil engineering, housing, community engagement,
and economics. This diverse expertise ensures robust governance and strategic
oversight, supported by dedicated volunteers who have already played a key role in
reaching the current stage of project development. 
Financial Management 
RCA employs modern financial management systems to ensure transparency and
accountability. Utilising software alongside professional bookkeeping support, RCA
maintains a continuous audit of all transactions, ensuring funds are spent effectively.
Financial performance is reviewed at monthly board meetings, where key targets are
set and organisational finances are managed. RCA also adheres to a procurement
policy based on best practices, supporting local businesses and suppliers in
alignment with its community wealth-building strategy. 
Volunteering and Employment Opportunities 
The CIF will support employment and volunteering opportunities within the Garnock
Valley. The paid positions will be established to transition RCA from a volunteer-
based organisation to a professionally staffed entity. These roles will facilitate the
expansion of charitable activities and open new avenues for local employment as the
project progresses. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 20

In addition to paid positions, the project will leverage additional resource into the
Garnock Valley expanding the organisation and generate numerous volunteering
opportunities. 
The expansion of activities and other community-focused projects will further
increase volunteer engagement. As the Knox Institute develops into a social
enterprise hub, additional employment and volunteer opportunities will arise
alongside other projects. 
Human Resources (HR) Plan 
RCA’s HR strategy is centred on ethical recruitment and staff welfare. The
organisation follows a safe recruitment policy, ensuring that all hires align with its
community values and ethical standards. RCA is committed to paying the Real Living
Wage and meeting all statutory obligations, including pension and National
Insurance contributions. Recruitment will involve a transparent process, with
positions advertised online, followed by a thorough screening and interview process.
RCA’s HR policies include Equal Opportunities, Safe Recruitment, and safeguarding
practices. Staff data is managed in compliance with GDPR regulations, and RCA
ensures data security through GCHQ NCSC accredited protocols, maintaining Cyber
Essentials certification. RCA is committed to exceeding legal health and safety
requirements by promoting best practices across all its operations. The organisation
prioritises the health and wellbeing of its employees, encouraging positive lifestyle
choices, building resilience, and proactively managing workplace health issues.
RCA’s Health, Safety, and Wellbeing policy is regularly reviewed and monitored by
the board to ensure a safe and supportive working environment. 
Community Impact and Sustainability 
The project is designed to stimulate local economic growth and environmental
sustainability. Through partnerships with educational institutions and adherence to
the Sustainable Development Goals (SDGs), the Electric Valley project aims to
create a resilient community capable of addressing future challenges, including
those related to climate change. RCA’s approach aligns with the Scottish
Government’s social enterprise code of practice, further reinforcing its commitment
to community development and environmental stewardship. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 21

7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) 65,000 
Please give a breakdown of cost and recent quotations where appropriate. 
Item Cost Quotation Supplied (Y/N)
Staff Costs 60800 Y
Overheads 4200 Y   
Please give a breakdown of details of match funding (if any) 
Funder Amount Funding Secured (Y/N)   
Further Detail on Finances Requested
The future financial viability of the RCA will be substantially underpinned by the
“equity returns” generated by our community owned wind turbine project. Our current
financial models indicate, that there will be approximately £370k realised over the
next five years. (see Appendix 5 on cashflow projection) 
2025- £9,965
2026- £40,634
2027 - £72,580
2028 - £107,274
2029 – £140,653
2030 £176,934
2031 – 214,822
2032 £256,004 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 22

2033 -295,779
2034 – 339,044
10 year projection = 1,281,808 (See Appendices 2 & 3 ) 
RCA CIF application 2
Salary 1 £20/h 30 = 31200
NI 1 13.8% = 3049.80
pension 5% = 1560
Total = 35809.8 
Salary 2 £15/H x 25 = 19500
NI 2 = 1435.20
pension 5% = 975
total = 21520.2
wage grand total = £57,330
overheads = £7670 
office rental contribution = 1,500
electric = 2,000
stationery (paper / printer ink etc.) = 1000
accountancy / hr = 1070
training = 2100
Total Estimated Salary Costs £65,000 
Job 1: Community Development Manager 
Summary: We are seeking a dynamic and passionate Community Development
Manager to join our team. The ideal candidate will be responsible for fostering and
nurturing a thriving community around our organisation or project. They will develop
and implement strategies to engage community members, build relationships, and
facilitate collaboration among stakeholders. The Community Development Manager
will also play a key role in advocating for the needs and interests of the community,
while ensuring alignment with organisational goals and values. This will include
oversight of the operation and development of RCA’s Renewable Energy
Resource(s) and the EV Strategy towards Net Zero 2030
Responsibilities: 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 23

1. Community Engagement: Develop and execute initiatives to engage
community members through various channels such as social media, events,
forums, and online platforms and Report to RCA Board on Monthly basis.
2. Relationship Building: Build and maintain strong relationships with community
members, partners, stakeholders, and local organizations to foster collaboration and
support for RCA Net Zero strategy.
3. Community Advocacy: Advocate for the needs and interests of the community
within the organization and represent the organization within the community.
4. Strategy Development: Develop strategic plans for community development,
including goals, objectives, and key performance indicators (KPIs).
5. Content Creation: Create engaging content, including newsletters, blog posts,
social media updates, and other materials to keep the community informed and
engaged with EV Strategies.
6. Facilitation: Organise and facilitate meetings, workshops, and events to bring
community members together, facilitate discussions, and drive collaboration.
7. Feedback Collection: Gather feedback from community members through
surveys, interviews, and other means to understand their needs, preferences, and
concerns and tailor EV and Net Zero Strategies accordingly.
8. Operational: Provide organisational development support and secure
resources to support community and RCA’s Renewable Energy development and
Progress to 2030 Net Zero Targets.
9. Monitoring and Evaluation: Monitor and evaluate the effectiveness of
community development initiatives and make adjustments as needed to achieve Net
Zero 2030 goals and objectives.
10. Collaboration: Collaborate with internal teams, including marketing, product
development, customer support, and others to ensure alignment and integration of
community development efforts with overall organisational objectives and Report to
the RCA Board Monthly on progress.
Qualifications:
• Bachelor's degree in a related field such as community development,
communications, marketing, or social sciences. Master's degree preferred.
• Proven experience in community development, community management, or a
related field.
• Strong communication skills, both written and verbal, with the ability to
effectively engage and interact with diverse audiences.
• Excellent relationship-building skills with the ability to establish rapport and
build trust with community members and stakeholders.
• Strategic thinking and problem-solving abilities with a results-oriented
mindset.
• Experience with social media management, content creation, event planning,
and project management. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 24

• Ability to work independently as well as part of a team, with strong
organizational and time management skills.
• Passion for community wealth building, social impact, and making a positive
difference to the locality.
Additional Information:
• This position may require occasional evening or weekend work to
accommodate community events or meetings.
• Travel may be required to attend conferences, meetings, or events related to
community development. 
Job Title 2: Project Officer
Summary: We are seeking a proactive and versatile Project Officer to join our team,
with a focus on supporting our transport initiative and other aspects of the Electric
Valley project. The successful candidate will play a pivotal role in coordinating and
facilitating activities related to promoting sustainable transportation options, as well
as providing administrative support to ensure the smooth operation of the project.
This role offers the opportunity to contribute to the development of innovative
solutions for transportation challenges while supporting the broader goals of the
Electric Valley project.
Responsibilities: 
1. Stakeholder Engagement: Engage with stakeholders, including local
communities, government agencies, advocacy groups, and transportation providers,
to gather input, build partnerships, and foster collaboration.
2. Project Coordination: Coordinate and support the implementation of the
transport project, including organising meetings, managing schedules, and tracking
progress against milestones.
3. Campaign Management: Assist in the development and execution of
marketing and outreach campaigns to promote active travel options such as walking,
cycling, and public transit.
4. Event Planning: Plan and organize events, workshops, and outreach activities
to raise awareness about the benefits of active travel and encourage behavioural
change.
5. Data Collection and Analysis: Collect, analyse, and report on data related to
active travel patterns, usage of transportation infrastructure, and other relevant
metrics to inform decision-making and measure the impact of initiatives.
6. Community Engagement: Engage with community members to understand
their needs and preferences regarding active travel infrastructure and programs, and
incorporate their feedback into project planning and implementation.
7. Policy Support: Assist in researching best practices, policies, and regulations
related to active travel and provide support in advocating for policy changes to
support sustainable transportation options. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 25

Office Administration and Electric Valley Project Support:
1. Administrative Support: Provide administrative support to the project team,
including managing correspondence, scheduling meetings, preparing documents
and presentations, and maintaining project files and records.
2. Financial Management: Assist in budget tracking, expense reporting, and
procurement processes to ensure compliance with project requirements and financial
regulations.
3. Communication and Coordination: Facilitate communication and coordination
among project team members, partners, and stakeholders, including organizing
meetings, preparing agendas, and documenting meeting minutes.
4. Research and Documentation: Conduct research, gather information, and
prepare reports, briefs, and other documents to support project planning, decision-
making, and reporting requirements.
5. Other Duties: Provide support as needed on other aspects of the Electric
Valley project, including but not limited to electric vehicle infrastructure development,
renewable energy integration, and community engagement initiatives.
Qualifications:
• Proven experience in project coordination, community engagement, or related
areas, preferably in the transportation or sustainability sector.
• Strong organisational skills with the ability to manage multiple tasks and
deadlines effectively.
• Good communication skills, both written and verbal, with the ability to interact
with diverse stakeholders.
• Proficiency in Microsoft Office suite (Word, Excel, PowerPoint) and project
management tools.
• Knowledge of active travel principles, transportation planning, and
sustainability concepts.
• Ability to work independently with minimal supervision and as part of a team in
a fast-paced environment.
• Passion for sustainable transportation, environmental conservation, and
community development.
Additional Information:
• This is a part-time position, with occasional travel required within the Garnock
Valley.
• Flexibility in working hours may be necessary to accommodate evening or
weekend events.
• The successful candidate will have the opportunity to contribute to innovative
solutions for sustainable transportation and environmental sustainability. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 26

. 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
Project Monitoring and Evaluation Strategy 
A dedicated Project Management Board will be established to oversee all aspects of
the project, including comprehensive monitoring, analysis, and evaluation processes. 
Digital Progression 
We will utilise a range of accessible digital tools that enable applicants to progress
through the various stages of the project. 
Project Strategy and Milestones 
A detailed project strategy will be developed. This strategy will outline the entire
process, and will identify key milestones with target completion dates. The strategy
will include both hard and soft monitoring indicators, with specific goals to measure
progress and success. 
Communication and Promotion Plan 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 27

A comprehensive project communications plan will be prepared to ensure effective
promotion through various channels. This will help attract participants and raise
awareness within the community. 
Monitoring and Evaluation Measures 
A checklist of evaluation measures will be created to track progress at each stage of
the project. 
Risk Management 
A risk register will be maintained using a traffic light system (red, amber, green) to
categorise tasks by risk level, severity, and impact. This register will outline
mitigation actions, assign responsibilities, and set deadlines. It will also document
how issues are identified, managed, and resolved, contributing to learning for future
projects. 
Regular Monitoring and Updates 
Monthly project meetings will be held to review monitoring data and adjust plans as
necessary. This information will be updated bi-weekly and communicated with the
project team and partners. 
SMART Targets 
All project targets will be defined using the SMART framework (Specific, Measurable,
Achievable, Relevant, and Time-bound) to ensure clear, trackable progress towards
project goals. 
Support and Mentoring 
We will monitor the support needs of volunteers, including "buddies" to provide
mentorship and assistance. 
Dissemination and Experience Sharing 
We will engage and to share experiences and learning outcomes within the
community. We will share our knowledge to allow others to engage practically,
including any project innovations. We will document experiences through case
studies, which will be shared widely with partner organisations, media, and networks,
recognising the project’s alignment with broader policy goals. 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 28

Implementation Summary 
The project management approach follows the Five Case Model, which is applicable
to policies, strategies, programmes, and projects. This model includes the following
key dimensions: 
1. **Strategic Case**: Establishes the context and the strategic assessment,
ensuring alignment with overall goals.
2. **Commercial Case**: Explores the preferred way forward, considering the
commercial aspects and procurement strategies.
3. **Financial Case**: Focuses on affordability and funding, ensuring the project is
financially viable.
4. **Management Case**: Outlines the plan for implementation, monitoring, and
delivery management.
5. **Economic Case**: Evaluates the value for money and net present value,
ensuring the project contributes positively to the economy. 
### Steps in Project Appraisal and Delivery 
1. **Step 1: Strategic Context and Assessment**
- **Action**: Set the context and conduct a strategic assessment.
- **Outcome**: A clear understanding of the strategic environment and justification
for the project. 
2. **Step 2: Scoping and Strategic Outline Case (SOC)**
- **Action**: Define the scope and make the case for change.
- **Outcome**: A Strategic Outline Case that justifies the project and explores the
best approach. 
3. **Step 3: Planning and Outline Business Case (OBC)**
- **Action**: Plan the project, appraise value for money, and prepare for
procurement.
- **Outcome**: An Outline Business Case that assesses viability and sets up for
detailed planning. 
4. **Step 4: Delivery and Full Business Case (FBC)**
- **Action**: Implement the project with ongoing monitoring and management.
- **Outcome**: Successful delivery of the project with continuous oversight and
adjustments as needed. 
### Project Management Framework 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 29

Our project management at the delivery stage is structured through the PRINCE2®
framework, which divides projects into seven stages: 
1. **Starting Up a Project (SU)**
2. **Initiating a Project (IP)**
3. **Directing a Project (DP)**
4. **Controlling a Stage (CS)**
5. **Managing Product Delivery (MP)**
6. **Managing a Stage Boundary (SB)**
7. **Closing a Project (CP)** 
### Evaluation and Quality Assurance 
The evaluation model used is focused on learning and accountability, following the
principles of the Green Book guidance from HM Treasury. This involves: 
- Establishing a robust evidence base using various types of analysis (e.g., actuarial,
economic, financial, operational, scientific, and statistical).
- Using analytical models to test scenarios, understand problems, manage risks, and
compare options.
- Applying SMART criteria (Specific, Measurable, Achievable, Relevant, Time-bound)
to set and monitor objectives. 
### Integration with SDG and Best Practices 
The project aligns with Sustainable Development Goals (SDGs) and follows best
practices, leveraging partnerships with institutions like Strathclyde University and
EDAS. Quality assurance is embedded throughout the process to ensure the project
meets its strategic objectives and contributes to broader societal goals. 
See Appendix 4 
COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP

Page 30

The CIF will support proposals and projects that: 
● Connect with:
o The North Ayrshire Fair for All Inequalities Strategy;
o the Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
● Fulfil a compelling need and do not duplicate existing services or facilities;
● Provide long-term, sustainable, positive results for the greatest number of people
possible;
● Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
● Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
● Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
● Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
● LPs should continue to engage with their communities, and stimulate interest in the
CIF. The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
● If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
● The finalised proposal will go to the next suitable Cabinet for final approval.
● Forms should be returned to your Locality Officer, by email if possible: 
Louise Riddex
Locality Officer (Kilwinning & North Coast)
Economy and Communities
Community Development Team
St John's Primary School
Morrison Avenue
Stevenston
KA20 4HH 
Email: lriddex@north-ayrshire.gov.uk
Tel: 01294475913
Mob: 07980964858

Page 31

For more information see the guidance form here: 
http://www.northayrshire.community/wp-content/uploads/sites/60/2018/06/community-invest
m ent-fund-guidance-notes-17-12-17.pdf 
1. Details of your organisation 
Name of Organisation
Clyde Coast & Cumbraes Men’s Shed
Postal Address for Correspondence
Name of Contact Person Mark Mair
Position in Organisation
Telephone Number
Email Address 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence. 
We are a Registered Charity and our SCIO Charitable Status number is SC051502.
We had our Official opening on the 4th of March 2023.
We are Constituted and receive guidance from The Scottish Men’s Shed Association
(SMSA) who also provided all the documentation templates for our Shed to modify
for our requirements. 
The main aim of the Clyde Coast & Cumbraes Men's Shed is to help improve men’s
mental & physical health and wellbeing by providing a venue where men can choose
to either work, relax, make and repair things, pursue hobbies and pastimes, get
practical help with projects and share & learn new skills.
Perhaps more importantly, it’s a place where men can make new friends, have a
cuppa, share positive & negative experiences, have a chat, a laugh and get out of
the house for a while.
We believe that all of the above will help to combat feelings of loneliness, isolation,
depression, anxiety, and will generally re-engage men back into our community.

Page 32

The Clyde Coast & Cumbraes Men’s Shed aims to provide a space and
opportunities for men to meet and take part in activities to encourage community
spirit and enhance mental & physical well-being. 
The Shed provides space for any interested Members to learn guitar playing on a
Monday afternoon. There are 2 levels Beginners & Advanced.
There is a Walking Group who meet up every Monday morning. The walk varies
every week visiting various locations and they occasionally visit other sheds to chat
about Shed topics. 
Services we provide are open to the public, a bit like the repair shop. We have made
crosses for graves, temporary Memorial Plaques, repaired an Antique Singer Sewing
machine case, Grannies Milk Pan that she made during WW2. It is a very varied list
of skills that the Members have.
Another service we provide is minor material alterations, cutting material to size for
people building things at home.
The one thing we do not look at are any electrical items.

Page 33

3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for.
Please include:
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
The Alterations will be carried out in the Brisbane Centre at 30A Bath Street, Largs,
KA30 8BL. 
The Alterations are mainly for the Membership and visitors, but this also opens up
the opportunity for the Meeting Room to be let out to other groups who currently do
not have anywhere to meet up & chat. 
Members and visitors will benefit from a more spacious workshop area, improved
storage, modern disabled and unisex toilets, new staircase with stair lift to upper
floor, new office and craft room/meeting room. Both rooms will make it much easier
and comforting to use for members and visitors welfare needs.

Page 34

4. What difference will this project make within the locality and to local
services and programmes? 
Please include:
● The outcomes you aim to achieve
● How you will approach reducing inequality
● How this proposal fits with the Locality Partnership priorities of 1. Improving
access to financial services 2. Increasing social inclusion 3. Improving mental
wellbeing 4. Supporting skills and work opportunities 
The new unisex & disabled toilets, storage, office and meeting room/craft room, will
provide an improved facility that is self-contained.
The improvements will create a more conducive layout which will improve the space,
flow and general operations within the Shed.
New unisex and disabled toilets will improve the current facilities that are extremely
dated and do not provide the best user experience, especially the disabled facilities.
The new toilet facilities will be more accessible and user friendly for members and
visitors, with and without mobility issues.
There is no space available on the ground floor to create an office and meeting
room.
Creating an office upstairs will provide a contained room for administrative purposes
and will improve the efficiency of the Shed and overall running of the organisation.
The meeting room/ craft room will provide our members and visitors with an area to
have lunch, conversations, carry out craft activities, play and learn musical
instruments and hold meetings.
The new office and meeting room will also provide areas where members and
Trustees can deal with welfare issues of members & visitors, individually or
collectively, in clean, quiet, private, confidential areas.
The internal alterations will greatly improve the Sheds ability to provide improved
welfare and social conditions for our members and visitors. 
The alterations will add to and support our equality goals by providing an improved
facility to our members and visitors. Our members ages can range from 18 to any
age. Our oldest member at the moment is 95. Shed members reside in Skelmorlie,
Cumbrae, Largs, Fairlie & West Kilbride and cover all sections of society.
Our collaborations with outside groups, include the Scottish Women’s Institute &
Largs BB. We continue to explore possibilities of collaboration with other groups or
individuals from across the North Coast. 
We feel this proposal fits well with the Locality Partnership priorities 2,3 & 4.

Page 35

It may also fit with priority 1 as Trustees & Members of the Shed sometimes offer
financial support through advice and help with form filling. 
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
We have engaged with our members regularly on this subject. We have over 100
members.
The Trustees have consulted on a much wider platform through social media. 
6. How will the project be managed? 
Please include: 
● How the finances will be managed
● Does the proposed project contribute to volunteering or employment
opportunities in North Coast? Please include the number of volunteering
opportunities and employment opportunities
● If there are any staff requirements, please outline your HR plans 
The project will be managed by the nine Trustees, the chosen contractor and our
Architect.
The project finances will be managed by the Treasurer with the assistance, support
and guidance of the other eight Trustees.

Page 36

7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) 95,000 
Please give a breakdown of cost and recent quotations where appropriate. 
The quote of £95,000 was suggested by Stewart Associates, Chartered
Architects, Bath Street, Largs. 
Stewart Associates measured all of the Shed interior, including the alterations
area. Architect Drawings were produced and a figure was provided as an
indication of cost. 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
A strict Construction Management Plan will be agreed by the Contractor, Shed
Trustees and Architect, before any work takes place. This will be monitored regularly
throughout the project. 
Once the project has been completed, we will carry out an evaluation of the benefits
the alterations have made to our members and visitors.

Page 37

The CIF will support proposals and projects that:
• Connect with:
o the Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities, and stimulate interest in the
CIF. The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible: 
Denise Fraser
Locality Officer (Three Towns)
Community Development Team
St John's Primary School
Morrison Avenue
Stevenston
KA20 4HH 
Email: denisefraser@north-ayrshire.gov.uk
Mob: 07770 825129 
For more information see the guidance form here: https://northayrshire.community/wp-
content/uploads/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf 
COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP

Page 38

1. Details of your organisation 
Name of Organisation
Three Towns Growers (3TG) 
Postal Address for Correspondence
Click or tap here to enter text. 
Name of Contact Person Gordon Cowan
Position in Organisation Development Worker
Telephone Number Click or tap here to enter text.
Email Address Click or tap here to enter text. 
Total amount of funding requested: £49,420
Match funding (if any): £30,000 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence. 
Three Towns Growers (3TG) are an OSCAR registered charity. 3TG provide growing
spaces, be it cultivation of fruit & vegetables, social interaction and community
involvement. Nurturing people to live a healthier and more sustainable lifestyles. 
The charitable board of 3TG manage a Community Allotment at Elmpark in Ardrossan.
The allotment has been in existence for 11 years. There is currently 50 plots and 24
indoor and outdoor raised beds. The membership currently stands at 165. The key
word in the allotment title is ‘Community’. The growers board along with volunteers
organise and deliver community events throughout the year. In the previous 12 months
the events have had a footfall of over 6000 adults and children. We also undertake
group-based programmes onsite for schools, youth groups and older people. We offer
volunteering opportunities and experiences in growing and horticulture. 
COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP

Page 39

Other ongoing activities include a community outdoor kitchen, establishing protected
areas on site for the conservation of wildlife. Introducing bee keeping and looking at
ways to use plot surplus, fruit and veg for the community as well as having dedicated
areas to produce community food. As a community project we are working to establish
the provision of fresh fruit and vegetables to community larders in the Three Towns. 
The Growers partnership with several statutory and third sector organisations to
deliver activity on site and externally. These include NA schools, Health and Social
Care Partnership, Community Learning and Development, Community Brokerage,
The North Ayrshire Foodbank and more. 
Over the next 3 years the 3TG Board are working to increase community interaction
and activity in the Three Towns. 
3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for.
Please include:
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
The board are currently working to build and establish a Community and Education
Hub at Elm Park Allotment. This will have a direct benefit for plot and raised bed
holders and the 3TG membership and importantly provide a base to deliver
increased community involvement and community work. Costs for this build have
increased post lock down. The build will be on the site as designated in their lease
agreement therefore accessible for allotment users and importantly it will be within
walking distance from No11 bus stops and a railway station. The communities of the
Three Towns are the target audience. The 3TG have also through activities and
public events, reached out to and involved communities and individuals out with the
Three Towns. 
COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP

Page 40

4. What difference will this project make within the locality and to local
services and programmes? 
Please include:
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Promoting
the Local Economy and Tourism 2. Regenerating Community Facilities 3.
Increasing Civic Pride and Community Engagement, Improving Community
Wellbeing. 
The build will be part of promoting the local economy and tourism, i.e. the hub
being a part of a farmers’ market, the Grower’s public events held throughout the
year would be enhanced by the build. Looking at ‘joining’ up all the Three Towns
Community Hubs through cycle ways and walker and wheeler routes. 
As a new build and community facility, it will be part of Regenerating community
facilities, in the area. With a focus on community growing and horticulture. 
The build will not be just about allotment users and members it will look ‘outside
the fence’ to Increase civic pride and community engagement by providing a
place for community members to come together and take an interest in local
ecology, becoming climate aware, and growers of food wherever they are.
Volunteering for your community will be emphasised with a number of satellite
projects across the Three towns. 
It will be a facility that will be used actively seek to Improving community
wellbeing, by hosting events and activities that promotes positive mental health
and wellness. 
COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP

Page 41

What engagement has taken place in relation to the project?
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
Consultation has been ongoing, within the communities of the Three Towns and
wider, about how the building could be used. People who have taken part in this
include New Scots, people with physical impairment, children and teens. There has
been a digital and paper-based survey undertaken, and this is ongoing. There is
currently 320 persons who have provided feedback on how the centre could be
used. 
A summary of the consultation around how the Community and education hub can
be found at the end of this document.
5. How will the project be managed? 
Please include: 
• How the finances will be managed
• Does the proposed project contribute to volunteering or employment
opportunities in Three Towns? Please include the number of volunteering
opportunities and employment opportunities
• If there are any staff requirements, please outline your HR plans 
The project will be managed by the Board of the Three Towns Growers, with day-to-
day operation of the building being part of their development workers responsibilities. 
Financial again will be the responsibility of the 3TG board, who operate within the
guidance of OSCAR. 
The building will be an active hub for volunteering on site and out in the community.
There are volunteering opportunities in development now. Work experience is also
being looked at. Giving an opportunity for community members to take part in a
community café, a produce shop and other activities. 
There are currently no staff requirements for the building, other than the
Development Worker. However, as the facility develops this may become a
consideration by the Board. 
6. Amount of funding being requested 
COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP

Page 42

Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) £49,290 
Please give a breakdown of cost and recent quotations where appropriate. 
Item Cost Quotation
Supplied
(Y/N)
Decking area including
steps
£8625 Yes
Ramp & handrails £4,000 Yes
Protective barrier at
decking
£5750 Yes
Gravel strip round
perimeter
£1,200 Yes
Slabbed path £3,500 Yes
Timber pergola. £2,500 Yes
Disabled parking bays inc
kerbing
£8,000 Yes
Open textured asphalt
surfacing to road
£7,500 Yes
Total cost inc.VAT £49,290   
Please give a breakdown of details of match funding (if any) 
Funder Amount Funding Secured (Y/N)
National Lottery - Build £383,000 Yes
Three Towns Growers £30,000 Yes
CIF - Development Worker £100,000 Yes   
Click or tap here to enter text. 
COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP

Page 43

7. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
The board of the three Towns Growers will use and maintain a Performance
Information and Evaluative System linking in recording footfall, user surveys
Gathering feedback from users and participants, establishing and finding what is
working and not, from this seek to improve delivery. Ensuring that the Community
and Education Hub delivers in the best way for the community that it will serve.
Outcomes that will be surveyed for will include the following.
The 3TG will assess the impact of the project on the following
• Increasing educational and environmental awareness
• Increasing locally grown produce
• Increased partnership working
• Tackling poverty and reducing inequalities 
COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP

Page 44

COMMUNITY INVESTMENT FUND
THREE TOWNS LOCALITY PARTNERSHIP