Democracy Spraffa

Locality Planning 2.0

North Ayrshire Council · 6 May 2025
Back to Cabinet — 6 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

NORTH AYRSHIRE COUNCIL
6th May 2025 
Cabinet 
Title: Locality Planning 2.0 
Purpose: To seek Cabinet approval of the proposed next steps in relation to North
Ayrshire’s locality planning approach. 
Recommendation:       That Cabinet:
a) Notes the review work undertaken in relation to locality
planning in North Ayrshire;
b) Notes the national context and ongoing developments
regarding community and locality planning and local
democracy; and
c) Approves implementation of the proposals arising from the
locality planning review as detailed within the report. 
1. Executive Summary 
1.1 North Ayrshire’s Council Plan identifies ‘communities and local democracy’ as one of four
key priorities. The Council Plan sets out our ambition to develop strong relationships with
communities and partners based on trust and shared aspirations. The Council has long
recognised the importance of participative democracy in co-designing and delivering the
best possible services, within available resources, alongside partners and communities.
For democracy to thrive, people must be encouraged and supported to take part in decision
making at all levels. 
1.2 Alongside the national Local Governance Review, Democracy Matters 2 conversation and
review of the Community Empowerment (Scotland) Act 2015, officers have progressed a
programme of self-assessment work to identify areas of strength within our locality planning
framework along with proposals to further strengthen the approach aligned to our Council
Plan priority. 
1.3 This report sets out the results of the self-assessment work and the recommendations for
the future of locality planning in North Ayrshire. The recommendations include opportunities
to better support locality planning partnerships, the form and content of meetings, and a
renewed focus on locality action plans. The proposed next steps will build upon existing
good practice to further strengthen the role of locality planning and the involvement of
communities in local democracy. 
2. Background 
2.1 Collaboration, cooperation and collective action are recognised as leading to improved
outcomes for people, and open, transparent and participatory government is fundamental
to democracy. Over the past decade, North Ayrshire Council has been building its approach
to community empowerment by strengthening communities and improving participative
democratic processes. The Christie Commission in 2011 recognised the importance of this

Page 2

as a way of working as a driver for public sector reform. This was further enhanced by the
introduction of the Community Empowerment (Scotland) Act in 2015. The importance of
this work is embedded within the North Ayrshire Community Partnership Plan (LOIP) and
recognised through the inclusion of “Communities and Local Democracy” as one of the four
key priorities of the Council Plan, with the aim being that we will have active, inclusive and
resilient communities. 
2.2 The 2020 Best Value Audit Report recognised that the Council proactively engages with
communities, including hard-to-reach groups and its most vulnerable communities. In the
2021-22 Best Value statement, Audit Scotland identified that “The Council continues to be
open and transparent and demonstrates a culture of continuous improvement”. The North
Ayrshire Participation Strategy, which was approved by Cabinet in June 2024, seeks to
further that continuous improvement by setting out our overarching approach to
participation, offering an accessible pathway for communities to participate and a
commitment to developing new, innovative and inclusive methods for participation that
further the transparency of decision making. 
2.3 The Scottish Government has embarked on a Local Governance Review, and this national
programme of work, alongside the Council’s own recently published North Ayrshire
Participation Strategy, has been used as a catalyst to complete a self-assessment exercise
in relation to locality planning to understand opportunities for improvement aligned to our
Council Plan ambitions. 
2.4 Nationally, the Scottish Government has also been undertaking a review of the Community
Empowerment Act, and the initial findings and recommendations were published on 31st
March 2025. The recommendations outlined in this paper in response to our self-
improvement work support the emerging recommendations of the review, particularly in
terms of streamlining complex lines of accountability, improving policy coherence between
areas such as community planning and Community Wealth Building, involving the Third
Sector Interface and local anchor organisations as partners, and enabling effective
leadership in CPPs. 
2.5 The report on the latest of the ongoing series of Democracy Matters 2 (Local Governance
Review) conversations is expected later this year. Early indications are that the approach
outlined in this paper will also support the outcomes of the Democracy Matters work and
the Local Governance Review. Officers will continue to monitor the expectations from both
pieces of work on an ongoing basis and work with our national partners to identify shared
learning and expectations. 
2.6 One of the key routes for participation in North Ayrshire is through locality planning,
including the work of the locality partnerships which bring our Community Planning
Partners, elected members and community representatives together to jointly address local
priorities. Locality planning is one of the key levers used to encourage communities to work
together on joint priorities and co-produce solutions. Locality Plans, which cover smaller
areas within the Community Planning Partnership, focus on priorities agreed by each
Locality Partnership. 
2.7 Locality Planning is outlined in the Community Empowerment (Scotland) Act 2015 as a way
for Community Planning Partners to tackle inequality in a targeted and cohesive manner
for communities facing disadvantage. North Ayrshire Locality Planning arrangements are
through the North Ayrshire Decentralisation Scheme in terms of section 23 of the Local
Government etc (Scotland) Act 1994, as well as complying with Part 2 of the Community
Empowerment (Scotland) Act 2015. Locality Partnerships are chaired by elected members
as agreed by North Ayrshire Council and since the alignment of Elected Member wards to
locality boundaries in 2019, Elected Members sit on one Locality Partnership.

Page 3

2.8 Locality planning is a living process which we seek to continuously improve, with the last
development being a review of the partnership Terms of Reference and membership
criteria in 2022. The development of the locality planning journey to date is attached as
Appendix 1. 
2.9 Using the national context and the North Ayrshire Participation Strategy as a driver, a
programme of self- assessment work in relation to locality planning has been undertaken.
This reflects our ambition to continue to grow and improve the local governance framework,
using locality planning as a key lever to do so. It also reflects the ambitions of communities
across Scotland, which have been identified through the national Local Governance
Review and Democracy Matters 2 conversation. 
2.10 The self-assessment exercise took place during summer/autumn 2024 and included the
following:
• Surveys with all locality representatives to gain a deeper understanding and identify
what is currently working well, what the challenges to locality working are and what
the opportunities are to develop the collective contribution
• Completion of ‘locality profiles’ for each locality
• Engagement with elected members via a Policy Advisory Panel session
• A wider review of the best of practice across national networks to inform our locality
planning approach, tailored to local circumstances as required 
2.11 The key question which the self-assessment sought to answer was Are we addressing
inequalities as effectively as we could? 
2.12 Following the development of initial proposals, further engagement has been carried out
with elected members, community planning partners and locality partnerships. A timeline
of the activity undertaken is attached at Appendix 2. 
2.13 Analysis of the feedback from key representatives showed that members of locality
partnership felt a high level of involvement and ownership of the partnership, and that
community members in particular felt included and involved in decisions which were made.
The feedback also highlighted a number of areas for potential improvement including how
the time at partnership meetings was used and the potential of focusing in more depth
around particular priority themes at meetings. Discussions with our community planning
partners also reflected the challenges they have in resourcing locality planning and the high
level of movement in partner staffing arrangements recently. This reinforces the need to
ensure locality planning is as effective as possible and makes the best use of partners and
communities time in addressing inequalities. 
2.14 Key to the approach taken in the recommendations is an aim of establishing a core
approach to good practice across all six localities in North Ayrshire. Not every
recommendation is new to every locality. The aim is to ensure a consistent level of
expectation across all Locality Partnerships, while ensuring there is enough flexibility for
each area to adapt to their own needs. The recommendations are themed around the key
areas: 
Support for the Partnership 
2.15 Support for the partnership will be developed using the concept of the “Team Around the
Partnership”. This team comprises the Chair of the Partnership, the Connected
Communities Lead Officer, the Locality Officer and the Partnership Lead Officer for the
locality. Additional support for the delivery of the Locality Plan and the Council, LOIP and
HSCP priorities will be provided by Strategic Leads who are Council and HSCP Chief
Officers. An explanation of the roles and responsibilities are provided at Appendix 3. This

Page 4

strategic team will help tackle any ‘mission drift’ which may occur in the Partnership’s focus
and re-energise Council service, HSCP and CPP partner support. 
2.16 The size and complexity of each locality means that the structures that sit beneath each
partnership are of vital importance. A ‘locality profiling’ exercise was undertaken as part of
the self-assessment work to understand the key community and voluntary groups active in
each locality and the contribution they provide to their local community. We will review the
membership of Locality Networks which meet regularly to deliver on actions related to the
priorities and look at how we can drive participation and representation through existing
channels. A key action will be to continue to strengthen and develop the role of Locality
Networks with the support of the Council and HSCP Strategic Leads. Joint work, led by the
Strategic Leads, will help ensure alignment and integration between the locality work of the
CPP and the HSCP. This shared approach will also help identify how the ongoing work of
the Collaboration for Health Equity in Scotland (CHES) project can be embedded in
localities, reinforcing existing action to close inequities in healthy life expectancy.  We will
also increase training and development sessions for LP members and stakeholders. 
2.17 A place-based approach to locality planning is key, and a clear understanding amongst
stakeholders of the assets within our localities (people, buildings, skills, capacity, funding
etc) will be key to improving outcomes. In addition, the role of Local Place Plans and
engagement as part of the new Local Development Plan and through our Tenant and
Resident Associations will be an important aspect of locality discussions in the coming
months. 
Format and content of partnership meetings 
2.18 The Locality Partnership meeting is key to the effective delivery of locality planning. The
proposal is that we make a radical change to the meeting agenda and format to re-energise
the room. This will include a formal decision-making section at the start of each meeting,
followed by interactive discussions around an agreed locality priority. The co-production of
agenda items and the role of the community representative who is Vice Chair will be
emphasised. Alternative formats for reporting will reduce the time spent on “show and tell”
style feedback at the meetings which survey respondents indicated could be more
effectively communicated. We will further develop the Community Voice agenda item which
is already implemented in Garnock Valley across all partnerships. The Locality Partnership
Senior Officers Group will support with development activity around the redesign of the
meetings. 
Focus on the locality plan and addressing inequalities 
2.19 The focus of locality planning is to reduce inequalities, and the locality plan is the central
document which not only allows for planning but also monitoring of progress around
delivering on the locality priorities. With this in mind, we will refocus the locality plan to
emphasise its centrality to all work related to Locality Partnerships. Actions to address
priorities will be developed further with partners and community representatives. Plans will
clearly articulate the golden thread which runs upwards and downwards from locality plans
to the LOIP and the Council Plan. We will also clearly articulate links to Community Wealth
Building in communities. The locality plan will be the driver for Partnership meetings,
discussions and projects. 
2.20 Our communities are key to not only the development but delivery of locality priorities. The
community of volunteers within North Ayrshire make an invaluable contribution across the
board. In parallel to the implementation of Locality Planning 2.0, officers will work with
partners across the Council, Third Sector Interface and KA Leisure to understand how we
can better attract, support, recognise and retain volunteers locally and improve the overall
volunteer experience.

Page 5

Community Investment Fund (CIF) processes 
2.21 One of the key decisions currently made by Locality Partnerships is around their allocation
of Community Investment Funding (CIF). At present we are engaged in a comprehensive
review of grant making processes across the Council which has the intention of streamlining
the process for applicants and ensuring robustness and appropriate governance. As part
of this work, we will update the CIF guidance which is provided to applicants and
strengthen the checklist which Locality Officers’ complete and supply to assist with decision
making. This will help to ensure that applications which reach our Partnerships are as
robust and aligned to local priorities as possible. As CIF funding is expended and the
approach reaches its natural conclusion across the various localities, we will work with
communities and partners to ensure a smooth transition to new ways of co-production. 
2.22 Next steps to implement the recommendations will include:
• Upskilling cross service Council officers in the purpose and methods of Locality
Planning at the forthcoming Leadership Conference in April 2025
• Launching the next phase of locality planning with Community and Locality Planning
Partners and communities
• Working with the Locality Partnership Senior Officers Group to further develop and
embed the proposed changes with partners
• Further developing the profile of locality planning through corporate communications
channels, including a focus on reporting on progress against locality priorities 
3. Proposals 
It is proposed that Cabinet:
(i) Notes the review work undertaken in relation to locality planning in North Ayrshire;
(ii) Notes the national context and ongoing developments regarding community and
locality planning and local democracy; and
(iii) Approves implementation of the proposals arising from the locality planning review
as detailed within the report. 
4. Implications/Socio-economic Duty
Financial
4.1 The delivery of the proposals will be carried out using existing resources. 
Human Resources 
4.2 There are no human resources implications arising from the report. 
Legal 
4.3 The proposals ensure the Council continues to meet its statutory duties in regards to the
Community Empowerment Act (Scotland) 2015. In particular they ensure a refreshed and
revitalised approach to addressing inequalities through the locality planning mechanism as
specified in the Act.

Page 6

Equality/Socio-economic 
4.4 The purpose of locality planning is to reduce inequalities, widen democratic participation
and advance community empowerment by encouraging people to become involved in their
community. The refreshed approach ensures that these purposes can be met more fully. 
Environmental and Sustainability 
4.5 Locality planning supports sustainability through, for example, community involvement and
volunteering in environmental projects, as well as providing funding for projects which
contribute towards their sustainability. 
Key Priorities
4.6 Locality Planning supports the North Ayrshire Council Plan strategic aims: 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience for local
people by involving local people in identifying priorities and codesigning processes which
deliver solutions to poverty and inequality related issues.
• We will have active, inclusive and resilient communities by providing a key process for local
democratic decision making.
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities through supporting localized use
of assets and identifying priorities which make best use of Council resources. 
Community Wealth Building 
4.7 Locality planning encourages increased democratic participation and greater awareness of
opportunities, for example, for community ownership of land and assets and plural
ownership of the local economy through inclusive ownership models. 
5. Consultation 
5.1. The proposals contained within this paper have been developed in response to the survey
of locality partnership members as detailed above in paragraph 2.10 and in collaboration
with the strategic Community Planning Partners as detailed in paragraph 2.12 
David W. Hammond
Executive Director Communities and Housing 
For further information please contact Rhonda J. Leith, Head of Service (Connected
Communities), on (01294) 324415. 
Background Papers 
Appendix 1 - Development of Locality Planning in North Ayrshire
Appendix 2 - Self assessment activity programme
Appendix 3 - Roles within the “Team Around the Partnership

Page 7

Appendix 1: North Ayrshire Locality Partnership Development Timeline 2014-24

Page 8

Appendix 2: North Ayrshire Locality Planning Review Activity Timeline 2024-25 
Initial Scoping
meetings in spring
2024  and LP survey 
Policy Advisory
Panel Session
Community Launch
Information
Session
Links to
Leadership
Conference in
April 2025
Cabinet Report
2025
Embedding of
from review and
launch of Locality
Planning 2.0

Page 9

Appendix 3: Locality Partnership Role Structure