NORTH AYRSHIRE COUNCIL
21 January 2025
Cabinet
Title: Local Housing Strategy 2023–2028: Progress Update
Purpose: To provide Cabinet with an annual update on progress of
the Local Housing Strategy 2023-2028 and to seek
approval for the update to be submitted to Scottish
Government.
Recommendation(s): It is proposed that Cabinet: (i) notes the content of this
report and progress against the LHS Action Plan; (ii)
approves the addition of the action detailed in Appendix 2;
and (iii) approves submission of the LHS update to the
Scottish Government.
1. Executive Summary
1.1. The Housing (Scotland) Act 2001 places a statutory duty on local authorities to
produce a Local Housing Strategy that sets out its strategy, priorities, and plans
for the delivery of housing and related services.
1.2. The North Ayrshire Local Housing Strategy 2023–2028 was approved by Cabinet
on 13 June 2023 and sets out the strategic priorities for tackling housing issues
in the area during the five-year period.
1.3. The Local Housing Strategy enables the Council to monitor progress against
national and local priorities. It is a statutory requirement for a Local Housing
Strategy to be kept under review; the Scottish Government expects all local
authorities to review and report on progress annually. 
1.4. This report provides an overview on progress made to date on the delivery of the
Local Housing Strategy 2023-2028.
1.5. Members are invited to note the contents of the report; approve the addition of
the action as detailed in Appendix 2; and approve submission of the LHS update
to the Scottish Government.
2. Background
2.1. The Housing (Scotland) Act 2001 sets out local authorities’ duties to prepare a
Local Housing Strategy which details the Council’s strategy, priorities, and plans
for the delivery of housing and related services.  The 2001 Act states that the
Local Housing Strategy must be:
• supported by an assessment of housing provision, including the need and
demand for housing-related services;
• submitted to Scottish Ministers; and

Page 2

• kept under review by the Council.
2.2. The Scottish Government expects all local authorities to review and report on
progress annually.
2.3. The North Ayrshire Local Housing Strategy 2023-2028 was approved by Cabinet
on 13 June 2023 and sets out the strategic ambition for Housing in North
Ayrshire: “we want all our people to live in the right homes, in great places, with
access to any support services they need”. Four overarching outcomes were
developed to achieve this ambition, which align to our Council Plan and the four
key strategies in the Scottish Government’s ‘Housing to 2040’ vision:
• Outcome 1: More homes at the heart of great places – Our places support
thriving and inclusive communities;
• Outcome 2: Affordability and choice – Our people have affordable homes in
the places they choose to live;
• Outcome 3: Affordable warmth and zero emissions – Our homes are energy
efficient and release less emissions;
• Outcome 4: Improving the Quality of our Homes – Our homes are in good
condition and people can access any support services they need.
Achievements to Date 
2.4. To measure the outcomes of the Local Housing Strategy 2023-28, an action plan
was developed with 41 actions having their own desired outcome and target date.
Although the strategy is only in its first year of implementation, there have been
a number of successes within the action plan to date. These are grouped under
each of the approved LHS outcomes noted at paragraph 2.3: 
Outcome 1 – More homes at the heart of great places
2.5. The Local Housing Strategy aims to support the Council’s Community Wealth
Building approach and Regeneration Delivery Plan to make our area more
successful for everyone, improving our places, establishing thriving town centres,
supporting health and well-being, and providing more opportunities for a better
quality of life. Housing can make a strong contribution to regeneration by
contributing to positive health outcomes and supporting a sense of community.
The Council utilised their role as a major house builder in North Ayrshire to
maximise local employment and training opportunities. For example, as part of
the Community Benefits clause within the Harbourside, Irvine development
contract, the contractor created 27 new jobs for local people, seven new
apprenticeships and utilised the local supply chain of suppliers and sub-
contractors. 
2.6. A total of 136 new homes were delivered during 2023/24 by the Council and our
Registered Social Landlord (RSL) partners as follows: 
Development Number of Homes Additional Comments

Page 3

Harbourside, Irvine 36  Harbourside regeneration
opportunity aligned to
Ayrshire Growth Deal
investment
Afton Court, Stevenston 6 Town centre regeneration
and modular construction
Former Police Station,
Largs
12  Town centre regeneration
Tarryholme, Irvine 31 Riverside development
West Byrehill, Kilwinning 27 CHA development
Green Street, Saltcoats 24 Town centre regeneration 
2.7. Cunninghame Housing Association’s (CHA) 20-unit development at Garven
Road, Stevenston concluded during October 2024. The Council’s new build
project at Newhouse Drive, Kilbirnie (7 units) concluded during December 2024,
the Laburnum Avenue, Beith (7 units) and St Mary’s, Largs (26 units) projects
are anticipated to be completed during January 2025. 
2.8. In addition, works are currently underway at the following new Council
developments: 
• James McFarlane, Ardrossan (19 units)
• Stanecastle, Irvine (31 units)
• King’s Arms, Irvine (6 units)
• Garnock Academy, Kilbirnie (50 units)
• Ayrshire Central Hospital, Irvine (202 units) 
2.9. The Council developments listed above contribute to the Council’s commitment
to deliver 1,643 new homes. The Strategic Housing Investment Plan (SHIP)
2025-2030, approved by Cabinet on 3 December 2024, sets out the Council and
its partners commitment to deliver new affordable homes in North Ayrshire,
supporting the Scottish Government’s target to deliver 110,000 new affordable
homes by 2032. 
2.10. Private developers delivered 248 new homes during 2023/24 at active sites
including Woodfarm, Kilwinning; North Newmoor and Montgomerie Park in
Irvine; and Sharphill in Saltcoats. Persimmon Homes commenced development
of sites at Mayfield Farm, Saltcoats; West Byrehill in Kilwinning and Portencross
Road, West Kilbride which together will deliver over 1,000 private sector homes.
In total, the latest housing land audit anticipates 1,489 private sector completions
over the next 5 years. Planning Services are engaging with private housebuilders
to set the Local Housing Land Requirement for LDP3, as part of the Evidence
Report for the new plan. A further update will be provided to elected members
during early 2025. 
Outcome 2 – Affordability and choice

Page 4

2.11. The Scottish housing system is under significant pressure with a number of local
authorities having declared a housing emergency due to the unprecedented
pressure to meet their statutory responsibilities towards homeless people and
other priority groups in housing need. Whilst there is increasing pressure on the
housing system, a range of measures are being undertaken across the housing
system, including increasing housing supply, and managing the demand from
homeless people by way of temporary and permanent accommodation. 
2.12. North Ayrshire Council has recently experienced increasing levels of
homelessness and a significant increase in demand for temporary
accommodation which puts additional pressure on general housing supply. The
North Ayrshire Homelessness Task Force remains focussed on homelessness
prevention to ensure there are robust processes in place to ensure that the
Homelessness Prevention Duties are implemented effectively. The development
of the North Ayrshire Homelessness Prevention Strategy is underway and due
to be launched during 2025 following the outcomes from the new Housing Bill. 
2.13. North Ayrshire Council has established the Arran Housing Task Force which
involves a wide range of partners to address the issues which face island
residents and businesses. The taskforce aims to assess the demand for
affordable housing on Arran and identify issues that may be limiting economic
sustainability and growth. Working in partnership with the Scottish Government,
local community groups and Registered Social Landlords who operate on the
island, the task force is the recognised body that works collaboratively on issues
relating to housing on Arran. 
2.14. Private housing (owned by individuals or private landlords) forms 73% of all
homes in the area, with the remaining 27% being owned and rented by North
Ayrshire Council and local Registered Social Landlords (RSLs). The cost of
buying or renting a home in North Ayrshire is much lower than the national
average. 
2.15. All Council commitments in relation to Home Office Resettlement programmes
have been successfully completed with appropriate support provision provided.
The Council currently supports 165 Ukrainian households and bought back 33
ex-local authority properties in 2023/24 utilising Scottish Government funding to
be used to provide housing for Ukrainian Displaced Persons (UKDP). 
2.16. When the Rapid Rehousing Transition Plan (RRTP) commenced in 2019, a
target was set for North Ayrshire to create 100 Housing First tenancies over a
five-year period.  As at 31 March 2024 the Council has created 100 Housing First
Tenancies. A full analysis of Housing First performance is to be undertaken and
following the review of the outcome, a new target will be set for future years. 
2.17. Five former social housing properties were purchased by the Council to increase
the affordable housing supply through the SHIP 2024-2029 buyback scheme,
achieving our target of purchasing five properties during 2023/24. 33 properties
were also acquired for Ukrainian Displaced Persons in the last quarter of 2023/24
which were fully funded by the Scottish Government. It is recognised that
purchasing ex-local authority stock is an effective way to increase social housing

Page 5

stock and provide value for money for the investment made and the current SHIP
2025-2030 has increased the Council’s buyback scheme to 60 properties by
2030. The Council’s developing Registered Social Landlord partners have also
included buyback programmes within the SHIP, aiming to acquire a further 29
new homes. A Buy Back Strategy is under preparation and will be considered by
Cabinet during 2025 to ensure that the Council continues to meet housing need
across North Ayrshire and to ensure funding is maximised and value for money
is demonstrated across various funding streams. 
Outcome 3 – Affordable warmth and zero emissions 
2.18. At the design and planning stage for each new build Council development
identified in the SHIP, an options appraisal is carried out to determine the most
appropriate sustainability measures required to reduce fuel poverty for tenants
as well as contributing towards the Council’s net zero target. 
2.19. As part of the capital programme for investment for existing stock, solar PV and
external wall insulation has been included in the re-roofing and re-rendering
measured term contracts where appropriate to ensure tenants benefit from a
better insulated home, reduced heat loss and have the ability to utilise solar
panels to reduce utility bills.
2.20. The new and emerging Social Housing Net Zero Standard (SHNZS) was
consulted on and responded to by North Ayrshire Council in February 2024. The
new standard is likely to require increased fabric performance and replacement
of ‘polluting’ heating systems with ‘clean’ heating systems in our housing stock.
The proposals have significant implications for the housing asset management
approach and 30-year HRA Business Plan, including cyclical replacement of
heating systems and other fabric elements e.g. window, roof and insulation
programmes.  
2.21. A pathfinder project is in progress to review the financial, technical and customer
implications associated with the emerging standard.  The project focuses on the
traditional housing stock built between 1945 and 1960 which makes up
approximately 75% of the stock profile.  A sample of properties are being
selected from within this group and will be subject to detailed assessment,
survey, application of a range of fabric and replacement heating solutions,
engagement with tenants, and then post completion monitoring including, the
thermal comfort in the property, ease of use of heating controls and utility costs
for the tenant.    
2.22. Two Sheltered Housing and Fuel Poverty Officer posts have been permanently
embedded into the Housing Support Team to work with tenants to reduce fuel
poverty.
2.23. A comprehensive review of our approach to tackling condensation, dampness
and mould has been completed. Housing and Building Services staff have been
trained to identify the signs of dampness and mould within a tenant’s home and
are able to support early intervention when signs of dampness and mould are
identified. 
Outcome 4 – Improving the quality of our homes

Page 6

2.24. The Housing Asset Management Plan (HAMP) was developed and approved
during September 2023 to complement the Local Housing Strategy 2023-2028
approved in June 2023. The HAMP action plan aims to ensure the Council’s
housing stock is maintained in a condition compliant with existing and proposed
legislation and building standards. Progress on the action plan is reported to the
Housing Asset Management Board (HAMB) on a bi-monthly basis to ensure
appropriate governance mechanisms are in place to support the delivery of the
action plan. 
2.25. The Estate Based Regeneration Programme (EBRP) continues to deliver
projects to address pockets of low demand stock; antisocial behaviour; external
appearance; parking provision; road and footpath condition; fencing;
landscaping; and general grounds maintenance issues. Since the introduction of
this programme in 2019 there has been successful delivery of an additional 622
new parking spaces, the demolition of low demand flatted blocks to make way
for new affordable housing, landscaping at four sites, a significant fencing
programme, and some smaller improvement projects. 
2.26. The Private Sector Housing Team continue to promote and provide a ‘pre-
tenancy support service' for landlords. An event was held in June 2024, ‘Under
One Roof’, where the pre-tenancy support service was promoted alongside other
initiatives such as the missing shares scheme and the repairing standard. The
team provide free property inspections and tenancy agreement advice which is
designed to act as a preventative measure to future property condition issues
and tenancy sustainment. The team will continue to explore alternative methods
to promote the service more widely. 
2.27. A comprehensive review of the Housing/ Homelessness delivery model was
completed during 2023/24 which created an integrated approach across Housing
Services. The new model, which was fully launched on 7 May 2024, ensures that
every tenant will receive an annual visit to identify the current and long-term
needs of our tenants. 
2.28. The Sheltered Housing Reprovisioning Programme refurbishment of Barnett
Court, Saltcoats completed in January 2024 and works at Cheviot Court, Irvine
completed in November 2024. Work is anticipated to commence at Vineburgh
Court, Irvine and Laigh Court, Beith during spring 2026, following confirmation of
a heating strategy for these complexes. 
2.29. In addition, a new Customer Participation Strategy 2023-28 was approved by
Cabinet in June 2023 to deliver the three agreed priorities:
Priority 1 – Engage and inform – ensuring two-way communication with our
tenants and customers, and providing opportunities for customers to take part
in ways that meet their needs;
Priority 2 – Empower and influence – developing the skills and confidence of
our tenants to shape the services we provide;

Page 7

Priority 3 – Evolve and innovate – continually improving our services to meet
the needs of our customers.
Areas of Future Focus 
2.30. Priorities that require further action, and will be implemented during the
remaining lifespan of the Local Housing Strategy 2023-2028 are as follows: 
Outcome 1 – More homes at the heart of great places 
2.31. As reported to Cabinet on 3 December 2024, the Council was advised of a
reduction to the 2024/25 funding Resource Planning Assumption (RPA). The
Council was also advised of an expectation that the funding would reduce in
future financial years. 
2.32. On 4 December 2024, Scottish Government announced a draft £768m budget
for the 2025/26 Affordable Housing Supply Programme. This represents an
increase of 38% to the original published 2025/26 budget of £556m and is
£15.8m higher than the 2023/24 budget. The Council anticipates formal
notification of the 2025/26 North Ayrshire Resource Planning Assumption during
spring 2025. The uplifted budget will support delivery of prioritised projects, and
the shadow programme detailed within the SHIP 2025-2030. 
2.33. Planning Services are engaging with private housebuilders to set the Local
Housing Land Requirement for LDP3, as part of the Evidence Report for the new
plan. 
Outcome 2 – Affordability and choice 
2.34. The North Ayrshire Homelessness Taskforce, comprising of the Council and a
range of stakeholders, provides the governance framework for the delivery of
the North Ayrshire Rapid Rehousing Transition Plan, inclusive of Housing First.
The partners are currently working to understand the homelessness risk factors
affecting each of the partner organisations with a role in homelessness
prevention in North Ayrshire. This assessment will be used to develop the North
Ayrshire Homelessness Prevention Strategy 2025-2030, aligned to the
proposed new homelessness prevention duties detailed within the Housing
(Scotland) Bill 2024. 
2.35. A review of the North Ayrshire Common Housing Register (NAHR) Allocation
Policy is underway to ensure that it aligns to emerging issues, incorporating
national and local priorities. The consultation phase ended in January 2024, with
the review to be concluded by Spring 2025 and implemented in Autumn/Winter
2025. Alongside NAHR partners, a re-modelling exercise is currently being
undertaken as part of the review with regards to priorities and the awarding of
points. The opportunity to relaunch mutual exchange as a rehousing solution is
also being explored as part of the review and will form part of the revised policy.

Page 8

2.36. The number of women and girls who were homeless during 2023/24 increased
by 15 cases from 118 to 133 due to violence or abuse within the household.
Further work and discussions are ongoing with the Violence against Women
(VaW) partnership and the HSCP to identify a strategic lead for the Council in
early 2025 to help ensure that women and girls can access the services and
support they need. 
2.37. Following the successful implementation of the Redburn Grove Tenants and
Residents Association (TARA), further engagement work and an associated
action plan is required to be developed to fully identify the needs and aspirations
of Gypsy Travellers.  This will not be isolated to Redburn Grove and will include
the management and engagement opportunities when dealing with unauthorised
encampments. 
2.38. An options appraisal exercise is to be undertaken to identify potential
development opportunities at the Redburn Grove site, Irvine and to consider
transferring the site from the General Fund to the Housing Revenue Account,
aligning rents to our mainstream housing as appropriate. 
2.39. Housing Services are working to develop an inter-agency hospital discharge
pathway to minimise the risk of homelessness on discharge from hospital. The
pathway is due to be finalised in 2024 and will be implemented during 2025. 
2.40. Working in partnership with East and South Ayrshire Council, a prison discharge
outreach service is delivered from within HMP Prison Kilmarnock to offer advice
and assistance to those threatened with homelessness on release. In addition,
the North Ayrshire Homelessness Task Force has developed a Prison Discharge
Protocol aligned to the national ‘Sustainable Housing on Release for Everyone’
(SHORE) standards, to minimise the risk of crisis for people being released from
prison. The protocol is currently being revised and scheduled for a re-launch
during 2025. 
2.41. Further analysis is required to determine trends and areas for improvement in
relation to homelessness tenancy sustainment. As at 31 March 2024 the average
time taken to re-house homeless applicants from temporary accommodation was
22.39 weeks compared to the desired outcome of 13 weeks. A review of the
allocations model is currently being undertaken to ensure that the use of Council
housing stock is maximised to meet the needs of tenants and applicants. 
2.42. Housing Services operate a Rent Deposit Guarantee Scheme which aims to
assist potential tenants by providing a deposit to a private landlord (this is
repayable). The uptake of the scheme has been low over recent years due to
high demand for properties and lack of suitable accommodation. An options
appraisal will be carried out to ascertain the future of this scheme and to
benchmark against other local authorities.  An action plan will be developed
thereafter. Meanwhile, officers continue to discuss private sector options with
applicants and assist in negotiating rental terms as preventing homelessness

Page 9

and sustaining tenancies in the private sector is a key focus for North Ayrshire
as well as nationally. 
Outcome 3 – Affordable warmth and zero emissions 
2.43. The Social Housing Net Zero Standard (SHNZS) mentioned previously at
paragraph 2.21 is anticipated to be implemented during 2026, though no official
confirmation has ever been received around this date. Whilst an increase in
standards is expected, like many local authorities and registered social landlords,
there is a significant funding shortfall within the current 30-year HRA business
plan. There is a budget allocation for energy efficient improvements and heating
system replacement, however it is recognised that this will not be sufficient to
retrofit our existing stock. 
2.44. In anticipation of the new SHNZS standards, a contractor has been appointed by
the Council to undertake a pathfinder project to fully understand the financial,
technical and tenant implications of complying with zero emissions targets. A
sample of properties have been identified to include a range of different property
types with tenant consultation underway. A whole house approach to retrofit will
be undertaken to implement a range of energy efficiency and decarbonisation
measures across Council housing stock to ensure legislative requirements are
met. The project will also consider dampness and mould to inform the future
approach in dealing with these issues, with a specific focus on the use of
electronic monitoring. A report with findings and recommendations will be
prepared in early 2025 for further consideration. 
Outcome 4 – Improving the quality of our homes 
2.45. A self-assessment of asset management processes and data has been
undertaken to develop the Councils approach. This is to enable the delivery of
the Housing Asset Management Plan (HAMP) and takes cognisance of the
recommended practice on Integrated Asset Management published by the
Scottish Housing Regulator (SHR) in February 2023. The workstream forms part
of Housing Services Transformation Board programme for improvement with an
action plan developed to ensure delivery. Alongside property lifecycle data, the
outcomes from the action plan will inform future capital investment needs and
identify properties where investment required is not economically viable and
other solutions may be preferable, such as demolition.   
2.46. In establishment of the evidence report required for the Local Development Plan
3 (LDP3), consideration will be given to the establishment of a target for the
delivery of accessible homes within the private sector. This will complement the
10% target set by the Council for all future social housing developments. The
target date for the adoption of LDP3 is in the first quarter of 2027. 
2.47. The Scheme of Assistance is currently being reviewed to include the changes to
the Repairing Standard which came into force on 1 March 2024 and the
promotion of positive outcomes for people living with autism in the private

Page 10

housing sector. An action plan for consultation and engagement will be prepared
thereafter.
New action
2.48. To ensure the Local Housing Strategy 2023-28 continues to deliver on the
outcomes in which it set out for North Ayrshire, a new action has been developed
for adoption within the previously Cabinet approved action plan. The additional
action has its own desired outcome and target date for achieving the desired
outcome. The additional action is as follows:
‘Assess the future housing need and demand of our Island residents, workers,
and key workers.’
The Local Housing Strategy reaffirms our commitment to ensuring our Island
residents needs and aspirations are reflected in all service provision. Work is
ongoing with the Arran Housing Task Force who are continuing to work through
a dedicated action plan and further demand analysis to support the requirement
for affordable housing on the island.
3. Proposals 
3.1. It is proposed that Cabinet:
(i) notes the content of this report and progress against the LHS
Action Plan to 31 October 2024;  
(ii) approves the addition of the action detailed in Appendix 2;
(iii) approves the submission of the LHS update to the Scottish
Government. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Any financial implications arising from the projects and initiatives included within
the Local Housing Strategy 2023-2028 are accounted for within existing capital
and revenue budgets. Business cases will be developed to support any new
initiatives, as required. 
Human Resources
4.2 The Local Housing Strategy 2023-2028 is delivered by North Ayrshire Council
staffing and complemented by external expertise, where required. 
Legal

Page 11

4.3  The development and monitoring of the Local Housing Strategy 2023-2028,
which sets out its priorities and plans for the delivery of housing and related
services in North Ayrshire, ensures compliance with the Housing (Scotland) Act
2001.   
Equality/Socio-economic
4.4 The provision of good quality housing through the actions set out in the Local
Housing Strategy 2023-28 has a positive impact upon older people, children,
younger people, people with disabilities and households in fuel poverty. There
are no negative or discriminatory effects on any of the equality groups as a
result of the implementation of the strategy.   
Climate Change and Carbon
4.5 The Local Housing Strategy will continue to support the Sustainable North
Ayrshire Strategy 2024 - 2027,which aims to eradicate fuel poverty and
achieve net-zero carbon status by 2030. 
Key Priorities 
4.6 The Local Housing Strategy continues to support the Council Plan strategic
priorities: ‘Wellbeing’; ‘Climate Change’; ‘A Sustainable Council’; and
‘Communities and Local Democracy’. There is evidence that children and
young people can benefit from improved cognitive development and a reduction
in behavioural issues through living in a more attractive, warmer, and better
ventilated environment. The strategy also aims to support our island
communities and their economies. 
Community Wealth Building
4.7  A number of the initiatives detailed within the Local Housing Strategy continue
to result in North Ayrshire Community Benefits through training and
employment opportunities delivered through; the Council’s house building
programme, the wider Strategic Housing Investment Plan, Sheltered Housing
reprovisioning programme and through the Estate Based Regeneration
programme. 
5. Consultation
5.1  The progress of the LHS 2023-2028 has been prepared by gathering
information from various project leads across Council Services, as well as
partner RSLs. 
David W. Hammond
Executive Director (Communities & Housing)

Page 12

For further information please contact Fiona Ellis, Senior Manager (Housing
Strategy & Development), on 01294 324031. 
Background Papers 
Local Housing Strategy 2023-2028
Customer Participation Strategy 2023-2028
Strategic Housing Investment Plan (SHIP) 2024-2029
Strategic Housing Investment Plan (SHIP) 2025-2030

Page 13

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
1
Collaboration 
LHS_01. Review and update our Tenant Participation Strategy to: 
• Ensure inclusive engagement with hard-to-reach groups 
• Ensure our literature is available in a format that is suitable for people with literacy and / or sensory / communication issues 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
A refreshed
Tenant
Participation
Strategy is
adopted by the
Cabinet of
North Ayrshire
Council 
Housing Services Customer Participation Strategy 2023-2028
was approved by Cabinet on 13 June 2023 where the
following three priorities were approved:   
Priority 1 – Engage and Inform 
• 1,693 tenants are currently on the Tenant Panel. 
• 6,093 followers on Facebook.
• 692 followers on X.
• Sheltered Housing Complex guest bedroom
consultation.
• ‘Homes for Life’ Scottish Housing Day campaign.
• 
Priority 2 – Empower
• TARA estate walkabouts with tenants and residents.  
Priority 3 – Evolve 
• Office TV screens and Sheltered Housing TV screens
updated regularly to provide information to tenants
and customers. 
• Commission and
undertake three
yearly Tenant
Satisfaction
Survey
(commenced
Nov 24).
• Engage with
seldom heard
groups to ensure
all communities
have a voice. 
2023+  31 March
2026
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Housing, Customer
Engagement &
Support)

Page 14

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
2
More homes at the heart of great places 
LHS_02. Use our role as a major house builder to maximise local employment and training opportunities, and encourage our
partners to do the same 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Training and
employment
opportunities
are available
for local
people 
The Council is committed to improving socio-economic and
environmental outcomes through community benefits within
its procurement activity and has a community benefits policy
in place. The policy aligns with Council priorities, most
notably those captured in the 2020-2025 Community Wealth
Building Strategy and Local Outcome Improvement Plans. 
Community benefits are mandatory for all Council contracts
above £500,000, therefore are included in all social housing
development contracts. 
For example, the contractor for the Council’s Irvine
Harbourside development employed 20 new employees,
created seven apprenticeships, and provided nine work
placements. They also delivered 60 hours of career
development initiatives in North Ayrshire schools, promoting
the construction industry as a positive destination for all. 
Our Registered Social Landlord (RSL) partners are
encouraged to use Community Benefits Clauses in
construction and other tenders during scheduled update
meetings and at site nomination. 
• Work with the
Employability Team. 
• Continue to
collaborate with our
contractors to
ensure local
contractors are
utilised where
possible. 
2023+ 31 March
2028
Senior Manager
(Housing Strategy &
Development) 
Team Manager
(Affordable Housing
& Regeneration) 
LHS_03. Deliver 1,625 new units of social housing 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
1,625 new
homes are
developed
The SHIP 2024-2029 approved at Cabinet 7 November
2023 increased the previous target from 1,625 to 1,641 new
homes by 2029. This reflected a focus on buybacks and the
addition of 26 units at St Mary’s, Largs. 885 new Council
homes have been delivered as at 31 March 2024 against
the 1,641 target. 
• Ayrshire Central
Hospital, Irvine
development
commenced on site
during November 
2028  Senior Manager
(Housing Strategy &
Development)

Page 15

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
3
Despite the affordability challenges being faced, 136 new
homes were delivered by the Council and RSLs during
2023/24. 
The SHIP 2025-2030 was approved at Cabinet on 3
December 2024. As reported to Cabinet on 3 December
2024, the Council was advised of a reduction to the 2024/25
funding Resource Planning Assumption (RPA) . The
Council was also advised of an expectation that the funding
would reduce in future financial years therefore some
projects were prioritised and a shadow programme
developed to reflect funding assumptions. On 4 December
2024, Scottish Government announced a draft £768m
budget for the 2025/26 Affordable Housing Supply
Programme. This represents an increase of 38% to the
original published 2025/26 budget of £556m and is £15.8m
higher than the 2023/24 budget. The Council anticipates
formal notification of the 2025/26 North Ayrshire Resource
Planning Assumption during spring 2025. The uplifted
budget will support delivery of prioritised projects and the
shadow programme. Officers will continue to explore
alternative/additional mechanisms to support affordable
housing delivery. 
2024 and will deliver
202 units. 
• Laburnum,
Newhouse, and St
Mary’s to complete
during 2024/25.
• James McFarlane,
Stanecastle, King’s
Arms & Garnock to
complete during
2025/26.
• Explore
alternative/additional
mechanisms to
support affordable
housing delivery.
• Deliver 1,643 units
by 2029.
Team Manager
(Affordable Housing
& Regeneration) 
LHS_04. Deliver 1,300 new units of private sector housing 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
1,300 new
homes are
developed
Private developers delivered 248 new homes during
2023/24 at active sites including Woodfarm, Kilwinning;
North Newmoor and Montgomerie Park in Irvine; and
Sharphill in Saltcoats. 
Persimmon Homes commenced development of sites at
Mayfield Farm, Saltcoats; West Byrehill in Kilwinning and
Portencross Road, West Kilbride which together will deliver
over 1,000 private sector homes. 
• Continue to work
with private
developers to
deliver 1,300 new
private homes target
by 2028.
• Planning Services to
continue engaging
with private
housebuilders to set 
2028  Senior Manager
(Planning)

Page 16

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
4
the Local Housing
Land Requirement
for LDP3, as part of
the Evidence Report
for the new plan. 
LHS_05. Consider opportunities to provide homes in and around our town centres
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Housing is
developed in
or around
town centres,
where feasible
The Council delivered 18 amenity properties in Stevenston
and Largs during 23/34. Cunninghame Housing Association
delivered 24 new homes in Saltcoats town centre in August
2023.
• Work commenced in
May 2024 to deliver
6 amenity flats at
the former King’s
Arms public house
in Irvine town
centre.
• Deliver further town
centre homes,
where feasible,
during the lifespan
of the SHIP.
• Continue to work in
partnership with the
Regeneration Team
to identify potential
development
opportunities. 
2023+ 2028 Senior Manager
(Housing Strategy &
Development) 
Affordability & Choice 
LHS_06. Enforce a zero tolerance approach to harrassment and abuse against equalities groups
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Every identified
incidence of
harassment is
All cases of antisocial behaviour reported are
investigated by the local housing area office and/or
ASBIT. During 2023/24 we had 15 reports of
• Continue to
investigate and
respond to all reports 
2024 31 March
2028
Senior Manager
(Neighbourhood

Page 17

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
5
investigated and
actioned
harassment or abuse being reported to the Anti-
Social Behaviour team against equalities groups. All
15 cases reported where resolved within our locally
agreed targets.
of harassment and
abuse against
equalities groups. 
• Update our staff
training program to
ensure that they can
identify cases of
harassment and
abuse against
equalities groups. 
• Enhance our systems
to allow for further
analysis of cases and
create an action plan.
Housing &
Homelessness)
Team Manager
(Neighbourhood
Housing) 
LHS_07. Train our staff to understand cultural differences and challenges faced by different ethnic groups 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
100% of our staff
are trained
Equality & Diversity 2024 eLearn course is
mandatory for Council employees and was
completed by all Housing staff by the end of March
2024. 
• Staff will continue to
attend training offered
to increase their
knowledge of cultural
differences and
challenges faced by
different ethnic
groups. 
• Ensure all staff
complete Equality &
Diversity 2025 eLearn
course. 
2024 2028 Senior Manager
(Housing Strategy
& Development) 
Team Mananger
(Housing
Innovation and
Digital
Development)  
LHS_08. Work with national agencies and local partners to ensure refugees, asylum seekers and other displaced people
affected by conflict are supported to live in safety in our area 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
100% of refugees
and people
displaced by conflict
who are housed in
our area received
support
Our Refugee Support Team work together with the
CPP partners to deliver robust resettlement support
to assist families to integrate into the local
communities and access vital services to meet their
individual needs. 
• The Refugee Support
Team to continue to
work together with the
CPP partners to
ensure refugees and 
2023+ 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness)

Page 18

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
6
Our Refugee Support Team have begun liaising with
the MOD and Mears regarding supporting the
resettlement of five Afghan Households into North
Ayrshire. The privately procured properties will be
leased for a 3-year period and furnished accordingly
by Mears. 
Since 2022, the Council and CPP partners have
supported an overall total of 228 Ukrainian
households, comprising of 512 individuals, to
resettle in North Ayrshire across the different
Scottish Government sponsorship schemes. 
Asylum Seeking Households placed within
Dispersal Accommodation within North Ayrshire
have access to Housing / Homelessness advice and
assistance at the point of positive decisions being
received. To date, five positive (Indefinite Leave to
Remain granted) asylum discontinuations have
been issued, and all households have been
supported by our Refugee Support Team with
regards to achieving suitable move on opportunities
out with North Ayrshire at their request.
people displaced by
conflict who are
housed in our area
receive support.
• Consider existing
contracts and funding
position.
Team Manager
(Refugee Support)  
LHS_09. Engage with Gypsy / Travellers to ensure that housing solutions meet their needs 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Gypsy / Travellers
needs and
aspirations are
reflected in all
service provision
All 16 pitches at Redburn Grove GT site continue to
be occupied with a further waiting list of 16
applicants.
NAC continued working with partner services.
Services were delivered to the community alongside
MECOPP, Education, Money Matters, NHS, and the
Tenant Participation (TP) team as follows:
• An action plan to be
developed which
identifies the needs
and aspirations of
Gypsy Travellers and
how these will be met
will be developed in
partnership with 
2023 30
September
2025
Senior Manager
(Neighbourhood
Housing &
Homelessness)

Page 19

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
7
• The TP team met with Redburn residents’
group in September 2024 to maintain
positive engagement and opportunities for
residents to influence decision-making
around site issues.
• Eglinton Medical Practice hold 3 x monthly
clinics at Redburn Grove to give the
community direct access to a General
Practitioner onsite.
• Outreach tutors provide education onsite to
Gypsy/Traveller young people with two
recent leavers have successfully achieved
qualifications in various subjects. One is
now engaging with a Transition Officer to
apply for local colleges.
• During July and August, we assisted
families to enrol their children into Early
Years and Primary School, including
access to free school meals, clothing
grants and best start grants, where
applicable.
• Other referrals in September, include a
referral to Money Matters for an issue with
Council Tax arrears, updating driving
licences and a homeless presentation. 
Gypsy Travellers and
the Tenant
Participation team.  
LHS_10. Listen to Gypsy/Travellers from unauthorised encampments so that we can better understand and respond to their
needs 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
100% of
Gypsy/Travellers
living in
unauthorised
encampments are
approached for their
comments
Since 1st April 2024, NAC have engaged with and
managed 64 unauthorised encampments to 31
December 2024. 
The Gypsy/Traveller Co-ordinator completes a
needs assessment for every unauthorised
encampment site and provided advice and support
to the Gypsy/Traveller community where required. 
• A new performance
management framework to
be developed for 2024-25
which will include:  
o No of encampments  
o No of engagement
opportunities   
2023 2028 Senior Manager
(Neighbourhood
Housing &
Homelessness)

Page 20

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
8
We have introduced a new online reporting form
from the North Ayrshire Council webpage, which
allows the public to report encampments direct.
These are logged onto VERINT North Ayrshire
Estate Management system. For the period 1st April
to 30th September 2024, we have received 132
concerns regarding encampments. 
o No of referrals made
to other agencies  
o Impact of feedback  
LHS_11. Carry out an options appraisal on potential Gypsy / Traveller site improvements 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The publication of
our findings, and
supporting action
plan (if feasible)
Development project to be taken forward to provide
new accommodation. Site proposals have been
prepared which has identified additional land
required to progress and inform the options
appraisal. Estates have instructed a DV, and the
valuation is awaited to proceed. 
• Options appraisal
paper to be prepared
and presented to
Cabinet for approval. 
2024 31 March
2025
Senior Manager
(Housing Strategy
& Development)  
LHS_12. Develop and deliver an LGBTQ+ informed housing service, including:
• Establish LGBTQ+ champions 
• Develop an LGBTQ+ staff training programme
• Increase private sector awareness of LGBTQ+ housing issues
• Encourage our LGBTQ+ tenants and residents to participate 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The delivery of an
inclusive housing
service is evidenced
by involvement and
participation in the
delivery and
development of
housing services
Recruitment articles have featured on social media
and Tenants’ chat to recruit new members and to
encourage participation from tenants and residents. 
Housing staff attended a LGBTQ+ virtual training
session during July 2024 which was delivered by an
independent provider. This training increased
awareness of LGBT issues and helped promote
good practice. The session provided an opportunity
• The Tenant
Participation Team
have been invited to
attend a future
meeting of the LGBT+
youth group hosted
by Communities. 
• LGBTQ+ Champions
to be established 
2024 2025 Senior Manager
(Housing Strategy
& Development)
Team Mananger
(Housing
Innovation and
Digital
Development)

Page 21

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
9
to explore and examine attendees’ own attitudes
and values as well as building their interpersonal
skills and confidence to better support people with
diverse gender identities and sexual orientations. 
across Housing
Services. 
LHS_13. Work in partnership with statutory and third sector agencies to deliver planned national changes to homelessness
prevention legislation 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Publication of our
response
We continue to work collaboratively with the
Homeless Task Force in the creation of the
Homeless Prevention Strategy 2025 - 2030 &
preparation for implementation of the prevention
duties proposed in the Housing Bill. 
Business plan being drafted in relation to the
creation of a Prevention Team. The purpose of the
team is to strengthen prevention from within the
Housing Advice Team and lead on the national
changes. It is proposed that the Team will also work
with partners to implement the duties and provide
training/awareness as required. 
A review of the allocations model is currently being
conducted to maximise the use of housing stock to
meet the needs of council tenants and housing
applicants.  
• Continue
Homelessness Task
Force meetings.
• First Draft Homeless
Prevention Strategy –
November for Snr
Manager discussion.
• Wider partner /
stakeholder
consultations -
November /
December 2024.
• Draft Prevention
Team Business Plan
– October for Snr
Manager Discussion.
• Draft Allocation Model
- October for Snr
Manager Discussion. 
2023+ 2028 Senior Manager
(Neighbourhood
Housing &
Homelessness) 
LHS_14. Develop and deliver a North Ayrshire inter-agency strategy to prevent homelessness 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Levels of
homelessness will
reduce
A Homelessness Prevention Strategy is being
developed which will inform on the North Ayrshire
homelessness and prevention priorities, as agreed
by the Homelessness Taskforce.
• Benchmark exercise
against national
statistics on
homelessness 
2024 2028 Senior Manager
(Neighbourhood

Page 22

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
10 
following publication
of national statistics. 
• First Draft Homeless
Prevention Strategy.
• Wider partner /
stakeholder
consultations – early
2025.
Housing &
Homelessness) 
LHS_15. Through the ‘Violence Against Women Partnership 2021-2026, deliver the North Ayrshire violence against women and
girls action plan aligned to the ‘Equally Safe' strategy 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
A reduction in
domestic violence
and achievement of
the Violence Against
Women National
Standards
accreditation
In 2024 there has been no strategic lead/
coordinator for North Ayrshire Violence Against
Women Partnership, however a representative from
Housing Services in North Ayrshire is attends
national and pan-Ayrshire meetings and coordinated
the campaign of 16 Days of Action. North Ayrshire
VAWP have not received accreditation this year due
to the absence of a strategic lead. 
The number of women and girls whose reason for
homelessness was due to violence or abuse in
2023/24 was 133. In 2022/23, this was 118 which is
an increase of 15 (13%) cases. 
Housing Support Service to Women Experiencing or
at Risk of violence contract currently subject to
tender.
• Further discussions
with VAW
partnership/HSCP
around a strategic
lead to be identified.
• Following tender
process, meet with
service provided for
Housing Support
Service to Women
Experiencing or at
Risk of violence to
implement contract
and monitoring
framework. 
2026 2025 Senior Manager
(Neighbourhood
Housing &
Homelessness) 
LHS_16. Work with our partners to develop a hospital discharge pathway 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
0% of those leaving
a health care setting
will be homeless
A Housing specific pathway to be  launched in Q4 of
2024/25. 
• Pathway to be
launched 2025. 
2023 2025 Senior Manager
(Neighbourhood
Housing &
Homelessness)  
LHS_17. Continue to work with the HSCP to support young people make the transition from care to a home of their own

Page 23

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
11 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
100% of young
people are
supported as they
leave care and
move into their own
home
Care leavers are currently being supported upon
leaving care using the Throughcare Protocol. There
is a dedicated member of staff within housing who
facilitates this. It is anticipated that the new strategic
pathway being developed by HSCP will enhance the
existing pathway. 
During 2023/24, 25 young people leaving care were
provided with permanent housing through the North
Ayrshire Housing Register. 
The North Ayrshire Throughcare protocol is
currently under review, with the lead agency being
HSCP Throughcare Team. Once completed by this
team, Housing will review to ascertain and explore
responsibilities. 
Brighter Pathways Housing and Throughcare
Workstream has determined the HSCP stance with
regards to working with young people in respect of
their continuing care and housing needs. Meetings
are held monthly with all partners. Awaiting
recommendations from current throughcare review
prior to determining way forward. 
• Review of the existing
protocol with HSCP to
be completed by 2025
(this work is part of
the Brighter Pathways
workstreams).
• Throughcare protocol
to be reviewed and
implemented. 
2024 2025 Senior Manager
(Neighbourhood
Housing &
Homelessness)  
LHS_18. Consider the pathways into housing for young people to maximise housing options specific to their needs and reduce
the risk of homelessness 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Fewer young people
become homeless
This will be considered within the North Ayrshire
Homelessness Prevention Strategy 2025-2030. 
The proportion of homeless presentations for 16 to
25 in 2023/24 was 280 (24% of total homelessness
applications), compared with 278 (25% of total
applications) in 2022/23. 
• Explore additional
prevention activities
inclusive of best use
of allocations policy
and support provided
for under 25s. 
• Benchmark across
National figures. 
2024 2026 Senior Manager
(Neighbourhood
Housing &
Homelessness)

Page 24

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
12 
Explore CHAP Educational programme impact.
Explore appropriate resources and funding stream
to improve / expand the service.
• Meet with CHAP /
Education.  
LHS_19. Implement the integrated prison discharge protocol 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Homelessness as a
result of prison
discharge is
reduced to below
5%
During 2023/24, 77 (7%) of all approaches for
homeless assistance was a result of prison
discharge in comparison to 73 (7%) the previous
year. 
The Prison discharge protocol has been developed;
this is still in draft format awaiting approval. 
The aim of the SHORE standards is to ensure that
the housing needs of prisoners in prison are
handled at an early stage. This should be done in a
consistent way across Scotland, regardless of area,
housing status and how long they have been in
prison or young offenders’ institution. The standards
are designed to ensure that people leaving prison
can access services and accommodation in the
same way as people living in the community.   
Recruitment completed for temporary Justice post
within Housing First Team, start date to be
confirmed. 
• Launch of the revised
prison discharge
protocol.
• Continue to offer
Housing First to
repeat offenders to
support them to
reintegrate in the
community, promote
tenancy sustainment
and prevent
reoffending. 
2023 TBC Senior Manager
(Neighbourhood
Housing &
Homelessness)  
LHS_20. Implement Housing First for our most disadvantaged service users 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
100 Housing First
Tenancies are
delivered by 2024
The target set at the commencement of the RRTP in
2019 was to create 100 tenancies over 5 years for
Housing First. As at the 31 March 2024, 100
Housing First tenancies have been delivered.
Therefore, outcome has been met. 
Funding for RRTP available until 2026, further
commitment to 20 additional tenancies for 2024/25
and 2025/26. 
• A full analysis of
Housing First
performance is to be
undertaken.
• New target to be set
for future years. 
2023  Senior Manager
(Neighbourhood
Housing &
Homelessness)

Page 25

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
13 
LHS_21. Undertake a review of tenancies which have failed in the previous 12 months following resettlement of homelessness
to inform allocation processes 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Increased tenancy
sustainment
Within 2023/2024 reporting period, which is relevant
for sustainment of 2022/2023, sustainment levels
were 84.06% against a target of 88.38%. On
analysis of the tenancy “fails” highlighted, 28 out 77
failures were either mutual exchanges or alternative
secure accommodation sourced. This remains a
positive housing outcome which equates to
sustainment levels of 89.8%. 
• Report on tenancy
sustainment to be
analysed and findings
reported to Housing
SMT for action. 
• Target to be
established for future
years tenancy
sustainment.
• Scoping exercise to
identify relevant
training and services
available.
• Explore requirement
for Practitioner Forum
to discuss and work in
Partnership with other
services to deliver
holistic service. 
2024 2028 Senior Manager
(Neighbourhood
Housing &
Homelessness)  
LHS_22. Review the Rent Deposit Guarantee Scheme and recommend future approach 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Publication of the
review and action
plan (as
appropriate)
Local authorities across Scotland are struggling to
attract landlords to the scheme due to high demand
and lack of accommodation. The North Ayrshire
scheme is currently on hold due to a lack of interest
from private landlords. 
An options appraisal is currently being developed to
adapt and promote the scheme. 
• Action plan to be
developed following
the outcome from the
options appraisal
exercise. 
2024 2025 Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing Strategy)  
LHS_23. Align support delivery to prevention activities as identified within the Homeless Prevention Strategy 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to

Page 26

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
14 
Appropriate levels of
support available to
prevent and
alleviate
homelessness
The Housing Support team provide assistance and
support to people while living in temporary
accommodation and support tenants within all NAC
mainstream tenancies. The Housing Support Team
develop support plans based on a tenant’s
requirements including housing options, budgeting,
and managing a tenancy. 
The Housing Bill extends the duties to prevent
homeless to social landlords and wider services.
The development of the Homeless Prevent Strategy
will identify priority areas and training needs of
frontline staff. 
Wider partner / stakeholder consultations to
ascertain the individual services responsibilities and
ensure that services align to maximise homeless
prevention. 
The new integrated service delivery model with
housing, homelessness, advice, support, and
antisocial behaviour officers all being located within
locality-based housing offices is now fully
operational. This allows a joined-up response to
delivering an improved service to our tenants and
residents by resolving any issues as they arise at a
local level. 
A review of the allocations model is currently being
conducted to maximise the use of housing stock to
meet the needs of council tenants and housing
applicants.
• Development of
Homelessness
Prevention Strategy
2025 – 2030. 
• Consultation with
relevant
services/organisations
on implementation of
the strategy.
• Analysis of
performance
information.
• Review the stage 1
lead committee report
on the Housing
(Scotland) Bill 2024.
• Participate in national
events in relation to
the Housing Bill and
the implementation. 
• Develop training plan
for frontline staff.
• Monitor the change in
Service delivery to
ensure effectiveness
and implement any
changes as required.
• Transfer led letting
plan to be reviewed.   
2024 2026 Senior Manager
(Neighbourhood
Housing &
Homelessness)  
LHS_24. Review the proportion of social rented lets to homeless people to minimise the duration of homelessness 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Reduce the length
of stay in temporary
accommodation by
During 2023/24 48.5% of lets where made to
homeless (group 1) (52.7% NAC & 35% RSLs) with
an average case duration of 21.9 weeks. A review
of the letting plan is currently being conducted to
• Transfer led letting
plan to be reviewed.
• Allocation Policy
review. 
2024 2028 Senior Manager
(Neighbourhood
Housing &
Homelessness)

Page 27

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
15 
50% from 26 weeks
to 13 weeks 
maximise the use of housing stock to meet the
needs of council tenants and housing applicants. 
The average length of time by days across all
temporary accommodation types is 7.6 weeks in
comparison to 9.3 weeks the previous year.
Ardrossan direct access average is 1 week whilst
both dispersed and Women’s Aid is 14 weeks. 
The average duration of homelessness across all
cases during 2023/24 was 22.39 weeks regardless
of outcome. This was a reduction from 27.19 the
previous year. 
LHS_25. Consider introducing alternative housing models to meet local housing needs beyond social rented accommodation 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The publication of
the review and any
associated action
plan
Research into the feasibility of mid-market rents for
North Ayrshire has commenced and a report will be
published in 2025 with recommendations. 
NAC continue to work with the Scottish Government
on the feasibility of innovative models that are being
developed including leasing schemes. 
In April 2024, the Scottish Government created a
Housing Investment Taskforce of which NAC are a
member. The Housing Investment Taskforce will, by
March 2025, identify actions that will unlock both
existing and new commitments to investment in
housing by bringing together key interests of
investors and investees.  
• Research will
continue during 2025,
and a paper will be
drafted on the
feasibility of mid-
market rents for North
Ayrshire. 
2025  Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing Strategy)  
LHS_26. Support the Scottish Government's target to deliver 110,000 new affordable homes by 2032 by delivering the projects
set out within the Strategic Housing Investment Plan 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
New affordable
homes are built in
North Ayrshire
From April 2023 to 31 March 2024, 54 new Council
homes were delivered, and 101 homes were
delivered by our Registered Social Landlord
partners (RSLs).
• Continue to monitor
Council and
Registered Social
Landlord (RSL) 
2028  Senior Manager
(Housing Strategy
& Development)

Page 28

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
16 
completions projected
for 2024/25. 
• Continue to monitor
the impact of the
Resource Planning
Assumption (RPA)
reduction and
deliverability of
current SHIP projects.
Team Manager
(Affordable Housing
& Regeneration)  
LHS_27. Research barriers to mutual exchange in order to increase its use as a rehousing solution 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
There is an increase
in the number of
mutual exchanges
A review of the allocations model is currently being
conducted to maximise the use of housing stock to
meet the needs of council tenants and housing
applicants. Once this has been completed a
relaunch and promotion of Mutual Exchange option
will be implemented. 
• Relaunch &
promotion of mutual
exchange. 
• Feasibility of creating
a Mutual Exchange
Officer post to be
explored. 
2024 2025 Senior Manager
(Neighbourhood
Housing &
Homelessness)  
LHS_28. Work with partners to align the North Ayrshire Allocation Policy to emerging issues, incorporating national and local
priorities 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The new policy is
published
Remodelling research findings and
recommendations were presented by the North
Ayrshire Housing Register (NAHR) Working
Subgroup to the NAHR Strategic Working Group
during September 2024. 
The key focus considerations for remodelling are
kinship carers; adopted families; care leavers and
care experienced young people; armed forces
veterans; home ownership; and domestic abuse.
Remodelling recommendations have been
considered and proposed, with exception of one
further area (Kinship Carers) where further
consideration is required. 
• Finalise agreement of
remodelling of the
Allocation Policy. 
• Agree process for
updating systems.
• Protocols agreed with
our partners.
• Policy to be published
and launched during
2025. 
2023 &
2026
2025 Senior Manager
(Neighbourhood
Housing &
Homelessness)  
LHS_29. Increase the social housing supply by buying back former social housing

Page 29

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
17 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Former social
housing is brought
back into the
affordable housing
supply
The target of 5 Council buy backs in 2023/24 was
met. The Council also acquired 33 properties via the
Ukrainian Resettlement Scheme. Riverside acquired
two homes in Kilwinning and Trust Housing
Association acquired two homes on Arran. 
SHIP 2024-2029 increased the Council’s previous
provision with a total of 65 properties to be bought
back over the lifetime of the SHIP. 
Out with the National Acquisition Programme, up to
£25m is being made available from within the
Affordable Housing Supply Programme budget over
2023 to 2028 for the Rural Key Workers Housing
Fund. The funding enables local authorities and
Registered Social Landlords to purchase existing
suitable properties in rural areas which can be
rented directly or leased to employers to provide
affordable homes for key workers. NAC and RSLs
are working in partnership to identify suitable
properties that can be bought back using this
funding to increase the affordable housing stock
available on our islands.
• Continue to buy back
properties, subject to
funding availability.
• Buy Back Strategy is
under preparation and
will launch in 2025.
• Identify further
properties that can be
bought back using the
Rural Key Workers
Housing Fund and
progress where
feasible. 
2023+ 2028 Senior Manager
(Housing Strategy
& Development)
Team Manager
(Affordable Housing
& Regeneration)  
LHS_30. Bring empty homes back into use through the buy back scheme 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Empty homes are
purchased and
brought back into
use as affordable
housing
Development of North Ayrshire Council’s Buy Back
Strategy commenced in 2024 with the strategy
providing a targeted approach for different matters
including having a focus on purchasing empty
homes to support the need for more affordable
housing in North Ayrshire. One empty home has
been acquired to date during 2024/25.
• Launch of the
strategy in 2025. 
2023+ 2028 Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing Strategy)

Page 30

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
18 
Affordable Warmth & Zero Emissions 
LHS_31. Support the Environmental Sustainability and Climate Change Strategy to reduce fuel poverty and increase affordable
warmth 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
Fuel poverty is
reduced, and
affordable
warmth is
increased for
North Ayrshire
residents
During the design and planning for each individual project
progressed through out SHIP, an options appraisal is
carried out to determine the most appropriate
sustainability measures required to reduce fuel poverty for
our tenants.  In our more recent developments, we have
opted for air source heat pumps alongside enhanced
fabric measures and solar PV panels.  An assessment
was carried out for each site and measure to ensure
property running costs were affordable for our tenants
alongside contributing to our net zero target.  
As part of our capital programme to replace roofing and
rendering, we have taken the opportunity to install solar
PV panels on all our properties as well as external wall
insulation where deemed appropriate. 
• Continue to review
each project on a
site-by-site basis to
ensure the most
appropriate
sustainability
measures are
utilised. 
2023+ 2028 Senior Manager
(Housing Strategy &
Development) 
Senior Manager
(Property
Management and
Investment) 
LHS_32. Implement a range of energy efficiency and decarbonisation measures across Council housing stock to meet EESSH2
requirements informed by an EESH2 pathfinder focusing on a whole-house approach to retrofit 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
A whole house
approach to
energy
efficiency and
decarbonisation
is adopted for
Council
housing stock
North Ayrshire Council have appointed a contractor to
carry out a pathfinder project, the purpose of which is to
fully understand the financial, technical and customer
implications of complying with Zero Emission targets. A
sample of properties representing our stock profile have
been selected and will be subject to a detailed initial
assessment, we are currently engaging with tenants at
these properties. A budget of £500,000 has been
allocated to this project with findings to be presented to
Housing during 2025.
• Report and findings
to be presented to
the Housing Asset
Management Board
(HAMB) for further
consideration during
2025. 
2023+ 2025 Senior Manager
(Property
Management and
Investment) 
LHS_33. Review our approach to dealing with dampness and mould issues within properties

Page 31

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
19 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
All our
properties are
free from
dampness and
mould and
advice given to
private sector
to achieve
same outcome
A comprehensive process map has been developed that
sets out the process and ensures issues with damp and
mould are effectively addressed. The core of this process
is in place and further elements, such as an expansion in
the use of electronic monitoring, are also under
consideration. Information gained through a pathfinder
project in relation to monitoring will feed into this. 
Tenant engagement has also been increased, with regular
information provided via the digital Tenant Chat channel. 
Housing staff have been trained to identify the signs of
dampness and mould within a tenant’s home. A review of
our Housing/Homelessness delivery model was
completed during 2023/24, and the new approach
includes a visit to every household once per year to help
identify the current and long-term needs of tenants and
will support early intervention when signs of dampness
and mould are identified by staff at the visit.
• Findings from the
Pathfinder project
will inform the use of
electronic monitoring
devices. 
2023 2025 Senior Manager
(Property
Management and
Investment) 
Senior Manager
(Operations –
Building Services)
Improving the quality of our homes 
LHS_34. Review Census 2022 data to identify any emerging issues which may impact housing and related services 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
Develop an
action plan to
address any
issues which
may emerge
following
review
Housing results from the 2022 Census were released in
August 2024. Key headlines are:
• North Ayrshire’s population has decreased by
3.4% since 2011, whilst 
Scotland has seen an increase.
• The number of households in North Ayrshire has
increased by 2.7%. 
• Council areas in the west and south of Scotland
have more older people living alone relative to
• The information
regarding North
Ayrshire will be
reviewed and an
action plan will be
developed to
address any issues
that have emerged. 
2024 2025 Senior Manager
(Housing Strategy &
Development) 
Team Manager
(Housing Strategy)

Page 32

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
20 
their overall population. In North Ayrshire, 12.2%
of our population is aged 55 and over and lives
alone.
• 32.7% of households in North Ayrshire have at
least two or more bedrooms than required. 
• 1.9% of households in North Ayrshire are
overcrowded, with one fewer bedroom than
required. 
The data is currently being reviewed, and an action plan
will be released in 2025 to address any issues identified. 
LHS_35. Promote and provide a ‘pre-tenancy support service’ for landlords (on tenancy agreements and property standards) 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
Landlords are
supported to
create and
maintain
tenancies in
accordance
with legislative
requirements
The pre-tenancy support service was established in April
2019 and is managed by the Private Sector Team. Uptake
has been low, and the team continues to look at
alternative ways to promote the service. 
The team presented at the North Ayrshire Under One Roof
event for landlords in June 2024 where the service was
promoted along with missing shares, and updates on the
repairing standard. Under One Roof is Scotland’s only
charity dedicated to providing free and impartial
information to the more than half a million tenement flat
owners, and housing professionals, on issues related to
tenement maintenance, common repair management, and
retrofit. 
The team continue to support landlords and tenants in
North Ayrshire with a range of other services including
tolerable standard inspections, missing shares assistance,
common repairs, resolving disputes, and empty homes.
• The team will
continue to look at
alternative ways to
promote the service.
• Review the stage 1
lead committee
report on the
Housing (Scotland)
Bill 2024 to ensure
the service remains
fit for purpose. 
2023  Senior Manager
(Housing Strategy &
Development)
Team Manager
(Private Sector
Housing) 
LHS_36. Continue to implement the Housing Asset Management Plan 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to

Page 33

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
21 
Implementation
of the Housing
Asset
Management
Plan action
plan
Integrated Asset Management - Regular meetings are
being held to focus on this area. An action plan has been
developed with input from both PMI and Housing to assist
in the implementation of a best practice model introduced
by the Scottish Housing Regulator (SHR). 
Scottish Housing Net Zeo Standard (SHNZS) - The
Scottish Government have recently published a
consultation paper regarding a new net zero standard for
housing and a cross-service response is currently being
collated. The proposed standard will replace the former
energy efficiency standards (EESSH and EESSH2) which
form part of the SHQS. 
Capital Programme - PMI and Building Services continue
to deliver the capital programme for investment in our
existing stock. Access difficulties continue to persist
impacting primarily on the rewiring programme. 
Statutory Compliance - Actions taken to improve access
(end to end process review, higher application of access
policy, additional staff resources) are yielding improved
results. 
• Implementation of
the integrated asset
management action
plan.
• Monitor emerging
legislation with
regards to energy
efficiency targets
and any changes to
Building Standards
regulations. 
• Continue the
delivery of the
capital programme
to improve the
condition of our
existing stock. 
• Continue to ensure
that statutory
compliance and
tenant health and
safety are always
adhered to and
address access
issues as and when
required. 
2027  Senior Manager
(Property
Management and
Investment) 
LHS_37. Prevent housing crisis through early intervention by ensuring housing staff can identify the long term needs of tenants to
ensure housing is sustainable 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
All housing
staff can
identify the
long-term
needs of
tenants,
including the
challenges
A review of our Housing/Homelessness delivery model
was completed during 2023/24. The aim of this was to
create an integrated approach with the teams across
housing services including the area housing offices,
housing support, homeless advice, and anti-social
behaviour. This approach will include a visit to every
household once per year to help identify the current and
• Visit every
household once per
year to help identify
the current and long-
term needs of
tenants. 
2024 2025 Senior Manager
(Neighbourhood
Housing &
Homelessness)

Page 34

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
22 
facing people
with
neurodiverse
issues
long-term needs of tenants. The new delivery model
commenced on 7 May 2024. 
Housing Options continues to be promoted by the Area
Housing Offices when applicants submit/change their
application for housing. 
Housing staff participated in an online training session in
October 2024 ‘Introduction to Neurodiversity’ which was
delivered by HSCP and in association with an external
partner.
• Lessons learned to
be conducted after a
full year of
implementation in
May 2025. 
LHS_38. Complete our Sheltered Housing Reprovisioning Programme by investing in 11 sheltered housing complexes over the
lifetime of this strategy 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
Sheltered
housing
complexes are
refurbished
The Barnett Court, Saltcoats refurbishment completed in
March 2024 and the Cheviot Court, Irvine completed in
November 2024. 
• Refurbishment of
Vineburgh Court,
Irvine and Laigh
Court, Beith with
work anticipated to
start at these units in
early 2026.
• Draft plans
consultation took
place at Moorburn
Park, Largs in
October 2024 and
draft plans are
currently being
prepared for Regal
Court, Dalry. 
2028 31 March
2029
Senior Manager
(Housing Strategy &
Development)
Team Manager
(Affordable Housing
& Regeneration) 
LHS_39. Ensure that the Strategic Housing Investment Plan addresses current and future demographic needs 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to

Page 35

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
23 
Housing
investment
priorities within
the Strategic
Housing
Investment
Plan align to
future and
current
demographic
needs
Demand for social housing is reviewed annually as part of
the development of the new SHIP.
• Development of a
performance
management
framework for
housing need and
demand. 
2023+ 31 March
2028
Senior Manager
(Housing Strategy &
Development)
Team Manager
(Affordable Housing
& Regeneration) 
LHS_40. Consider establishing a target for the delivery of accessible homes within the private sector 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
Local
Development
Plan 3 sets out
the
requirement for
accessible
private housing
delivery
An updated Development Plan Scheme incorporating the
proposed timetable for the preparation of LDP3 was
adopted by the Planning Committee on 22nd November
2023. The target date for the adoption of LDP3 is the first
quarter of 2027. 
An evidence-based approach to the establishment of a
target for the delivery of accessible homes within the
private sector is underway. This is aligned to the
preparation of the Evidence Report for LDP3 during 2024.
A Housing Evidence Paper will support the Evidence
Report and include whether a target is needed; if so, what
the target should be and how it might be implemented.
• Finalise and publish
the Housing
Evidence Paper;
seek the views of
stakeholders
including private
sector
housebuilders. 
2024 30 June
2027
Senior Manager
(Planning) 
Strategic Planning
Manager 
LHS_41. Review and update our Scheme of Assistance to:
• Ensure the promotion of positive outcomes for people living with autism in the private housing sector
• Ensure inclusive engagement with hard to reach groups 
• Ensure our literature is available in a format that is suitable for people with literacy and / or sensory / communication
issues 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to

Page 36

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan 
24 
The publication
of information,
sign posting to
advice services
and the
planned
refresh of the
Scheme of
Assistance
The Scheme of Assistance is currently being reviewed
which will include the changes to the Repairing Standard
which came into force on 1 March 2024 and the promotion
of positive outcomes for people living with autism in the
private housing sector. Following review, an action plan for
consultation and engagement will be implemented prior to
presentation at the appropriate Committee. The Scheme
of Assistance will be available in a format that is suitable
for people with literacy and/or sensory/communication
issues. 
Housing staff, including the Private Sector Advice Team,
participated in an online training session in October 2024
‘Introduction to Neurodiversity’ delivered by HSCP and in
association with an external partner.  
• Action plan for
consultation and
engagement will be
developed and
implemented. 
2025  Senior Manager
(Housing Strategy &
Development)
Team Manager
(Housing Strategy)

Page 37

Appendix 2   
LHS_TBC. Assess the future housing need and demand of our Island residents, workers, and key workers
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Island
resident's
needs and
aspirations
are reflected
in all service
provision  
• The Arran Housing
Task Force will continue
to progress its action
plan
• Issue the Arran Housing
Survey 2025
• Continue to review the
demand on the North
Ayrshire Housing
Register for Arran &
Cumbrae
• Attend national forums
to learn from our peers
and highlight the work
undertaken in North
Ayrshire 
2028  Senior Manager
(Housing Strategy &
Development) 
Team Manager
(Housing Strategy)