Page 1

NORTH AYRSHIRE COUNCIL 
21 January 2025 
Cabinet 
Title:    Revenue Budget 2024/25: Financial Performance to 30
November 2024 
Purpose:  To advise Cabinet of the financial performance for the Council
at 30 November 2024. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; and
(c) approve the virements detailed in Appendix 8. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2024/25 were approved by Council on
28 February 2024. The Housing Revenue Account (HRA) Revenue Budget for
2024/25 was approved by Council on 14 February 2024.
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the third report for 2024/25 and covers the period to the end of
November 2024 (Period 8). Projections have been made to the year-end.
1.3  At Period 8 the General Fund is forecasting a net in-year overspend of £0.689m,
(0.2%), after transferring resources to/from earmarked reserves. This is an
improvement of (£0.568m) from that reported at Period 5.
1.4 The main cost pressures highlighted within the appendices continue to be
experienced in relation to teacher absence and mandatory cover arrangements;
external residential placement for children and employee absence and cover
arrangements within Waste Services. However, employee absence performance has
improved across both services as a result of management action.  
1.5  The Housing Revenue Account is forecasting a net breakeven position, which is
consistent with previous reports.

Page 2

1.6  The Health and Social Care Partnership is projecting a year-end overspend of
£6.190m, (1.9%), for 2024/25. The Council services element is reporting a projected
overspend of £4.902m and the Health services element is reporting a projected
overspend of £1.288m. However, previously identified financial recovery actions have
reduced the projected overspend to £3.613m, £2.548m for Council Services, which is
an increase of £0.041m from the previously reported overspend, and £1.065m for
Health services, which is a £0.577m increase to the previously reported overspend. 
1.7 Significant risks to the reported position have been identified in relation to the reported
HSCP position which requires measures to be put in place by the HSCP to address
these risks. However, this position may have an impact on the level of financial
contributions from the funding parties. This presents a material risk to the financial
sustainability of the Council. The Integration Joint Board has submitted written
requests for additional financial support to both the Council and NHS Ayrshire &
Arran. Proposals for additional assistance will be developed and submitted for
consideration by Cabinet before the end of the financial year.
2. Background 
General Fund
2.1 The Council set a breakeven budget for 2024/25. In addition to the budget approved
on 28 February 2024, earmarked funds of £84.940m were carried forward from
2023/24 for service expenditure in 2024/25 and beyond. These funds are reflected in
the figures within the 2024/25 financial performance reports as they are drawn down.
2.2 Current financial projections indicate that a net in-year overspend of £0.689m, (0.2%),
net of transfers to/from reserves, is anticipated for the year to 31 March 2025. The
forecast position will continue to be monitored throughout the year. However, any final
overspend will require the utilisation of Council reserves and may negatively impact
on future budget gaps in the medium term.

Page 3

2.3 Details of the current financial projections are summarised in the following table:
Service Expenditure
App
No.
Annual
Budget
£ million
Projection
to 31 March
2025
£ million
Projected
Variance
for year
(Fav)/Adv
£ million
Projected
Variance
at P5
(Fav)/Adv 
£ million Movement Note 
Corporate Services 1 18.596 18.171 (0.425) (0.122) (0.303) (i)
Education 2 176.042 178.519 2.477 2.821 (0.344) (ii)
Place 3 53.341 54.833 1.492 0.861 0.631 (iii)
Communities &
Housing 4 13.776 13.699 (0.077) 0.000 (0.077) (iv)
Other Corporate Items 5 29.118 26.829 (2.289) (2.039) (0.250) (v)
Sub Total   290.873 292.051 1.178 1.521 (0.343)  
Health and Social
Care Partnership 9 131.241 131.241 0.000 0.000 0.000  
Balance for Services   422.114 423.292 1.178 1.521 (0.343)  
Financing Charges 6 15.223 15.223 0.000 0.000 0.000  
Contribution to Loans
Fund Reserve 6 7.672 7.672 0.000 0.000 0.000  
Total Planned
Expenditure   445.009 446.187 1.178 1.521 (0.343)  
Aggregate External
Finance 6 (370.154) (370.154) 0.000 0.000 0.000  
Council Tax 6 (65.681) (66.170) (0.489) (0.264) (0.225) (vi)
Use of Earmarked
Funds 6 (9.174) (9.174) 0.000 0.000 0.000  
Total Planned
Income   (445.009) (445.498) (0.489) (0.264) (0.225)  
Net Expenditure/
(Income)   0.000 0.689 0.689 1.257 (0.568)   
2.4 The reported Planned Income includes a number of adjustments to Scottish
Government funding from that reported at Period 5, as detailed in the following table:
Movements on Planned Income
General
Revenue
Grant
£ million
Non
Domestic
Rates
£ million
Specific
Grants
£ million
TOTAL
AEF
£ million
Revised Budget at P5 (321.693) (41.313) (6.864) (369.870)
Ukrainian resettlement (0.075) 0.000 0.000 (0.075)
Temporary accommodation (0.015) 0.000 0.000 (0.015)
Teacher induction adjustment 0.108 0.000 (0.302) (0.194)
Revised Planned Income (321.675) (41.313) (7.166) (370.154)

Page 4

2.5 Commentary on Significant Movements from Period 5 
The Council's overall financial forecast against the revised budget is an improvement
of (£0.568m) from the previously reported position. A brief explanation of the
significant movements at service level are outlined as follows:
(i) Corporate Services – underspend of (£0.425m), an improvement of
(£0.303m) from the previously reported underspend 
The movements are primarily related to:
• Vacancy management activity across all services, (£0.117m), and 
• Lower than anticipated ICT expenditure on software licences and support
costs, (£0.190m). 
(ii) Education – overspend of £2.477m, an improvement of (£0.344m) from the
previously reported overspend 
The movements are primarily related to:
• A net reduction in Employee Costs arising from vacancy management across
the service, (£0.346m);
• Revised grant income in relation to probationary teachers, (£0.194m); and
• Increase income from PPP contract deductions and rebates, (£0.091m).
These has been partly offset by:
• Increased external day and residential placement costs, £0.198m; and
• Revised projections for food costs and school meals income, £0.107m. 
(iii) Place – overspend of £1.492m, an increase of £0.631m from the previously
reported overspend 
The movement is primarily related to:
• Increased Employee Costs expenditure arising from the 24/25 pay settlement
within Waste Services, £0.251m;
• Residual RAAC cost projections at Ardrossan Academy and Mid Dykes Depot,
£0.245m;
• Reduced recyclates income reflecting reduced market prices, £0.203m; and
• Essential reactive property maintenance costs, £0.150m.
These have been partly offset by:
• Drawdown of additional external funding to support Employability services,
(£0.148m); and 
• Reduced expenditure on kerbside recycling contracts, (£0.112m). 
(iv) Communities & Housing – underspend of (£0.077m), an improvement of
(£0.077m) from the previously reported breakeven position
The movement is primarily related to:
• A projected over recovery of house and hostel rents, (£0.081m);
• Vacancy management within Other Housing, (£0.057m); and
• A reduction in projected void rent losses, (£0.051m).

Page 5

These have been partly offset by increased bad debt provision, £0.117m.
(v) Other Corporate Items – underspend of (£2.289m), an improvement of
(£0.250m) from the previously reported underspend
The movement is primarily related to a projected underspend on the Housing
Benefit subsidy based on the latest claim data, (£0.250m). 
(vi) Council Tax Income – overrecovery of (£0.489m), an improvement of
(£0.225m) from the previously reported overrecovery
The movement is primarily related a reduction in CTR claims, £0.130m, and
improved prior year collection forecasts, £0.062m.
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of October 2024 is
attached at Appendix 9. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised below: 
• The projected outturn is a year-end overspend of £6.190m for 2024/25. However,
this has been reduced to £3.613m due to previously identified financial recovery
actions. This is an increase of £0.618m since the previous reporting period;
• The projected overspend on the Council Services element is £4.902m over the
same period, reduced to £2.548m following the identified financial recovery
actions. This is an increase of £0.041m from the previous reporting period;
• The most significant areas of overspend include care at home, residential
placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and Unplanned
Activities (UnPACs) within the lead partnership for mental health.  Further detail is
included in the report at Appendix 9. 
The main areas of risk identified include: 
• The recent announcements by Scottish Government in relation to public sector
finances and in-year spending reductions will impact on current and future
funding, including for 2024-25 pay awards, which have recently been settled for
local government and NHS but the funding position is not yet clear;
• Continued growing demand for services;
• Staff recruitment and retention challenges across a number of service areas;
• The provider market and the ongoing ability to source packages of care for
service users;
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement;
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed;
• The ongoing review of the Integration Scheme;

Page 6

• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this;
• The wider system financial challenges, especially the financial position of NHS
Ayrshire and Arran Health Board, their financial deficit and the risks around further
escalation in the national framework for financial escalation.  North Ayrshire IJB
have already discussed our position in relation to the request for payment for
delayed discharges last financial year;
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future;
• The IJB free general fund reserves are estimated to be fully used during this
financial year, leading to an increased risk of requiring additional in-year financial
contributions from NHS Ayrshire and Arran and North Ayrshire Council to break
even;
• High risk areas of low volume / high-cost services areas e.g. Children’s residential
placements, Learning Disability care packages and complex care packages; 
• Lead / hosted service arrangements, including managing pressures and reporting
this across the 3 IJBs;
• The impact on Lead Partnership and acute services from decisions taken by other
Ayrshire areas;
• The use of supplementary staffing for enhanced observations across a number of
service areas;
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges;
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. Non-recurring
funding has been provided to meet costs associated with this but it is unclear
whether this will be sufficient;
• Scot Excel inflationary increases for children’s service are significantly higher than
assumed;
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire.
These risks and progress against the financial recovery plan will continue to be
monitored during 2024-25.
Risks
2.7 Under the terms of the Health and Social Care Integration Scheme, a recovery plan
must be agreed to address the projected overspend. There is a risk that, if the
recovery plan is not successful, this could have an impact on the level of financial
contributions from the funding parties. In accordance with the Integration Scheme, the
Integration Joint Board has submitted written requests for additional financial support
to both the Council and NHS Ayrshire & Arran and proposals for additional assistance
will be developed and submitted for consideration by Cabinet before the end of the
financial year. Although there would be an expectation that any additional
contributions would be repaid, this could have a knock-on effect on the level of
reserves available to address future Council budget gaps as provision would be
required for the potential non-recovery of these funds within a reasonable timeframe.
This position presents a material risk to the financial sustainability of the Council.

Page 7

Housing Revenue Account
2.8  The Housing Revenue Account budgeted for a breakeven position in 2024/25 and is
currently projecting to outturn in line with this. This is in line with the previously
reported position. The projected position is summarised in the following table with
further details provided in Appendix 7.
Housing Revenue
Account Annual
Budget
£
million
Projection
to 31 March
2025
£ million
Projected
Variance
for year
(Fav)/Adv
£ million
Projected
Variance
at P5
(Fav)/Adv 
£ million Movement Note 
Employee Costs 5.118 4.977 (0.141) 0.000 (0.141) (i)
Property Costs 21.816 23.443 1.627 1.523 0.104 (ii)
Supplies and Services 2.297 2.071 (0.226) (0.002) (0.224) (iii)
Transport and Plant
Costs 0.021 0.021 0.000 0.000 0.000  
Administration Costs 1.756 1.776 0.020 0.014 0.006  
Third Party Payments 3.877 3.938 0.061 0.049 0.012  
Transfer Payments 0.163 0.163 0.000 0.000 0.000  
Other Expenditure 0.490 0.490 0.000 0.013 (0.013)  
Capital Financing 26.525 24.607 (1.918) (1.970) 0.052 (iv)
Gross Expenditure 62.063 61.486 (0.577) (0.373) (0.204)  
Income (62.063) (61.486) 0.577 0.373 0.204 (v)
Net Expenditure 0.000 0.000 0.000 0.000 0.000   
2.9 Commentary on Significant Movements from Period 5
A brief explanation of the significant movements is outlined as follows:
(i) Employee Costs – underspend of (£0.141m), an increase of (£0.141m) from
the previously reported breakeven position 
The movement reflects vacancy management activity across the service. 
(ii) Property Costs – overspend of £1.627m, an increase of £0.104m from the
previously reported overspend 
The movement reflects increased expenditure Planned and Cyclical Maintenance
£0.111m, and Other Property Costs £0.099m. 
This has been partly offset by a reduction in Void Repair Costs, (£0.075m) 
(iii) Supplies and Services – underspend of (£0.226m), an increase of (£0.224m)
from the previously reported underspend 
The movement reflects a projected underspend on landscaping costs.

Page 8

(iv) Capital Financing – underspend of (£1.918m), a reduction of £0.052m from
the previously reported underspend 
The movement reflects adjustments to profiling within the HRA Capital
programme. 
(v) Income – under recovery of £0.577m, an increase of £0.204m from the
previously reported under recovery 
The movement is primarily related to an increased under recovery of Other Rents
following a review of overpayments.
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a)  note the information and financial projections outlined in the report; 
(b)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6 and
(c)  approve the virements detailed in Appendix 8.
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 30 November 2024 is a net overspend of
£0.689m. Further in-year measures will require to be put in place across Directorates
to address this.
Housing Revenue Account
The net projection for the year as at 30 November 2024 is a net breakeven position. 
Human Resources 
4.2  None. 
Legal 
4.3  None. 
Equality/Socio-economic 
4.4  None. 
Environmental and Sustainability 
4.5  None.

Page 9

Key Priorities 
4.6  This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7  None. 
5. Consultation 
5.1  Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2024/25: Financial Performance to 31 August 2024 – Cabinet 29 October
2024

Page 10

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 137              143              6                      4%
Total for Chief Executive 137              143              6                      4%
Financial Services
Change Programme 180              180              -                      0%
Audit, Fraud, Safety & Insurance 630              622              (8)                    (1%)
Corporate Procurement 893              828              (65)                  (7%) 1         
Financial Services 1,363           1,363           -                      0%
Revenues (610)             (630)             (20)                  3%
Transformation 669              643              (26)                  (4%) 2         
Total for Financial Services 3,125           3,006           (119)                (4%)
People & ICT
Employee Services 816              816              -                      0%
HR & Organisational Development 1,061           1,073           12                    1%
ICT 4,885           4,695           (190)                (4%) 3         
Business Support 1,044           1,068           24                    2%
Customer Services 3,876           3,852           (24)                  (1%)
Total for People & ICT 11,682         11,504         (178)                (2%)
Democratic Services
Legal & Licensing 407              357              (50)                  (12%) 4         
Policy, Performance & Elections 487              419              (68)                  (14%) 5         
Communications 447              457              10                    2%
Civil Contingencies 60                60                -                      0%
Committee Services 409              409              -                      0%
Member Services 1,311           1,309           (2)                    (0%)
Ayrshire Support Service 479              469              (10)                  (2%)
Information Governance 52                38                (14)                  (27%)
Total for Democratic Services 3,652           3,518           (134)                (4%)
Totals 18,596         18,171         (425)                (2%)

Page 11

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 15,912         15,678         (234)                (1%)
Property Costs 68                70                2                      3%
Supplies and Services 3,033           2,847           (186)                (6%)
Transport and Plant Costs 22                22                -                      0%
Administration Costs 1,360           1,356           (4)                    (0%)
Other Agencies & Bodies 1,937           1,937           -                      0%
Transfer Payments 853              853              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 23,185         22,763         (422)                (2%)
Income (4,589)          (4,592)          (3)                    0%
Net Expenditure 18,596         18,171         (425)                (2%)

Page 12

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement - No significant movement since the previous period.
925 (66) -7% Employee costs - There is a projected underspend of £0.066m due to vacancy management.
(66)                 
Note 2 Finance - Transformation
Movement - There has been a favourable movement of (£0.026m) since P5 due to a Government grant
covering staffing costs.
671 (26) -4% Employee costs - Underspend of £0.026m due to a Government grant being received to cover staff costs in
relation to certain projects.
(26)                 
Note 3 People & ICT - ICT
Movement - There has been a favourable movement of (£0.190m) since period 5 due to lower supplies and
services costs than anticipated.
2,156 (190) -9%
Supplies & Services - There is a projected underspend of £0.190m due to £0.095m underspend in software
licenses and support due to costs not as high as expected, £0.038m underspend in LAN, £0.027m underspend
in WAN and £0.030m underspend in server support this is due to costs less than anticipated.
(190)               
Note 4 Democratic Services - Legal & Licensing
Movement - There has been a favourable movement of (£0.050m) due to difficulties in recruiting for a vacant
post.
1,085 (50) -5% Employee Costs - There is a projected underspend of £0.050m due to vacancy management and staff
movement.
(50)                 
Note 5 Democratic Services - Policy, Performance & Elections
Movement - No significant movement since the previous period.
464 (68) -15% Employee costs - There is a projected underspend of £0.068m due to vacancy management.
(68)

Page 13

Appendix 2
EDUCATION
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 22,148         21,852            (296)                (1%) 1         
Primary Education 49,525         50,140            615                 1% 2         
Secondary Education 63,684         63,589            (95)                  (0%) 3         
Additional Support Needs 15,010         16,427            1,417              9% 4         
Central Education 3,455           5,445              1,990              58% 5         
Pupil Equity Fund 4,367           4,367              -                      0%
Facilities Management 17,732         16,578            (1,154)             (7%) 6         
Net Total 176,042       178,519          2,477              1%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 98,504         100,734          2,230              2%
Employee Costs - Non Teachers 48,632         47,772            (860)                (2%)
Property Costs 1,336           1,478              142                 11%
Supplies and Services 25,060         24,585            (475)                (2%)
Transport and Plant Costs 125              138                 13                   10%
Administration Costs 439              469                 30                   7%
Other Agencies & Bodies 8,702           10,651            1,949              22%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 71                71                   -                      0%
Gross Expenditure 183,449       186,478          3,029              2%
Income (7,407)          (7,959)             (552)               
Net Expenditure 176,042       178,519          2,477              1%

Page 14

Appendix 2a
EDUCATION
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement:  There has been an favourable movement of (£0.158m) compared to P5 due to increased
underspends of £0.148m in employee costs.
16,751 (286) -2%
Employee Costs: Overall an estimated underspend of £0.286m.
- Teachers:- no projected variance.
- Non Teachers:- projected underspend of £0.370m as a result of vacancy management offset by a budgeted
turnover target of £0.084m resulting in a net underspend of £0.286m.
5,122 - 0%
Third Party Payments: projected overspend of £0.171m in payments to funded providers due to a 13.9%
increase in hours being accessed, and a forecasted overspend of £0.142m on payments to Other Local
Authorities as more children taking up Early Years places outwith North Ayrshire than children coming into NAC
Early Years establishments.
(10) Other minor movements.
A reduction to the budget of £1.198m in 23/24 necessitated a drawdown from Education earmarked funds of
£0.507m pending permanent savings to be implemented for 24/25. The Service redesign has been developed
and was implemented by August 2024.
(296)
Note 2 Primary Education
Movement: There has been an unfavourable movement of £0.064m compared to P5 due to a projected
unachieved turnover in employee costs.
47,158 590 1%
Employee Costs : Overall an estimated overspend of £0.590m.
- Teachers:- projected breakeven position together with a budgeted turnover target of £0.493m resulting in a
net overspend of £0.493m
- Non Teachers:- projected underspend of £0.159m offset by a budgeted turnover target of £0.256m and
temporary additionality to support specific ASN in the early stages of P1, resulting in a net overspend of
£0.097m.
25 Other minor movements
615
Note 3 Secondary Education
Movement: There has been an unfavourable movement of £0.207m compared to P5 due to a projected
increase in teacher costs of  £0.216m. This is due to the anticipated turnover not being as high as previously
expected.
47,990 (100) 0%
Employee Costs : Overall an estimated underspend of £0.100m.
- Teachers:- projected underspend of £0.630m offset by a budgeted turnover target of £0.535m resulting in a
net underspend of £0.095m
- Non Teachers:- projected underspend of £0.192m offset by a budgeted turnover target of £0.187m resulting
in a net underspend of £0.005m
5 Other minor movements
(95)

Page 15

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 4 ASN
Movement: There has been an unfavourable movement of £0.016m compared to P5. This is mainly due to a
£0.056m increase in day placement fees, with an additional three children accessing day placement provision,
and a £0.142m increase in residential placement fees, which is mainly due to increased daily rates. This is
partly offset with a £0.183m increase in employee costs underspends.
13,070 (413) -3%
Employee Costs : Overall an estimated underspend of £0.413m.
- Teachers:- projected underspend of £0.358m offset by a budgeted turnover target of £0.073m resulting in a
net underspend of £0.285m
- Non Teachers:- projected underspend of £0.296m offset by a budgeted turnover target of £0.168m resulting
in a net underspend of £0.128m
400 (128) -32% There is a projected underspend of £0.128m on payments to Other Local Authorities, due to a reduction in the
number of NAC children accessing placements in their establishments.
1,010 509 50%
There is a projected overspend of £0.509m on external day placements, as a result of additional children
requiring this level of support and an increase in rates from these establishments.  Currently there are 32
children in, or expected in, day placement provision.  A review of the process has taken place.
543 1,569 289%
There is a projected overspend of £1.569m on external specialist residential placements.  Currently there are
15 children in, or expected in, accommodation.  Increased pressures on internal care settings as well as
changing needs of children and young people have resulted in an increase in the need for external residential
settings. Joint working is ongoing with HSCP to ensure that all options are fully explored to ensure that all
options are considered to retain young people within their local community where possible.  Where this is not
possible, a forum has been set up to further discuss those young people who will require care and education
provision to support them appropriately. Any future additional children who enter Residential Accommodation
will increase the future projected overspend.
(264) (120) There is a projected over recovery of £0.120m in Other Local Authorities income, due to the anticipated
number of other authority children accessing a place in NAC establishments, currently 11 pupils
1,417
Note 5 Central Education
Movement: There has been a favourable movement of (£0.412m) compared to P5 mainly due to a projected
increase in PPP deduction income (£0.091m), a reduction in the under recovery of teacher induction funding of
(£0.194m) and a further reduction across HQ employee costs (£0.127m)
2,767 2,076 75%
Employee costs: There is a projected overspend of £2.298m mainly as a result of significant increase in costs
associated with mandatory cover for teacher maternity cover and sickness absence. There are currently 33
Teachers (29.4 FTE) on maternity leave as well as 11 Early Years Practitioners and 3 PSAs (10.5 FTE). 
Absence levels are subject to regular review across the service and appropriate actions are taken to maximise
attendance. Average days lost per FTE is 5.74 for the period April-October compared to 4.75 days lost for
same period last year. Average days lost last year was 11 related to the whole service compared to an
estimated 13 days for this year. This is offset by projected underspend in Leadership & Music services of
£0.222m
- 108
There is a projected under recovery of teacher induction grant funding linked to a reduction in the number of
probationary teachers allocated to North Ayrshire by the Scottish Government. Core placement allocations
have been reduced from 51 FTE to 34 FTE resulting in a £0.108m reduction in anticipated grant funding.
(1,120) (197) 18% Income: PPP insurance rebate £0.065m and PPP deductions of £0.132m in excess of budget
3 Other minor movements.
1,990
Note 6 Facilities Management
Movement: There has been an favourable movement of (£0.061m) compared to P5 mainly due to revised
projections in food costs and school meals income based on actual data available
13,992 (607) -4%
Employee Costs: There is a projected underspend of £0.607m primarily due to recruitment challenges and a
targeted reduction of overtime and casual costs. £0.300m is related to newly created posts for the next phase
of UFSM roll out, which have still to be recruited
1,192 142 12% Property Costs: There is a projected overspend of £0.142m mainly in washroom supplies
5,123 (503) -10%
Supplies and services: There is a projected underspend of £0.164m in food costs which includes a projected
underspend of £0.350m (£0.179m food/£0.179m kitchen equipment) that relates to unallocated UFSM monies
(2,623) (234) 9%
Income: There is a projected over-recovery of cleaning and janitorial income of £0.111m and a projected under-
recovery of school meals income of £0.041m.  Additional funding of £0.165m has been received by Scottish
Govt in relation to school meal debt previously written off.
- 48 Other minor movements within transport and admin costs
(1,154)
Note 7 General
Management action to scrutinise all recruitment verification processes has now started in an attempt to reduce
the overall overspend across all employee costs.

Page 16

Appendix 3
PLACE
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 207              212               5                     2%
Neighbourhood Services
Roads 6,845           6,856            11                   0%
Streetscene 4,850           4,861            11                   0%
Waste Resources 9,104           10,006          902                 10% 1         
Municipalisation Advertising (123)             (73)                50                   (41%) 2         
Total for Neighbourhood Services 20,676         21,650          974                 5%
Economic Development, Growth and
Investment
Economic Policy 264              264               -                      0%
Employability & Skills 1,799           1,638            (161)                (9%) 3         
Regeneration 892              892               -                      0%
Business 992              992               -                      0%
Growth & Investment 247              247               -                      0%
Total for Economic Development, Growth and
Investment 4,194           4,033            (161)                (4%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,412           1,442            30                   2% 4         
Housing Assets & Investment (1)                 (1)                  -                      0%
Property Maintenance 3,789           4,184            395                 10% 5         
Property Running Costs 5,534           5,534            -                      0%
Energy and Sustainability 7,260           7,260            -                      0%
Internal Transport 10,270         10,519          249                 2% 6         
Total for Sustainability, Transport and Corporate
Property 28,264         28,938          674                 2%
Net Total 53,341         54,833          1,492              3%

Page 17

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 27,375         27,886          511                 2%
Property Costs 22,434         22,824          390                 2%
Supplies and Services 4,203           4,314            111                 3%
Transport and Plant Costs 9,441           9,876            435                 5%
Administration Costs 565              565               -                      0%
Other Agencies & Bodies 15,029         15,988          959                 6%
Transfer Payments -                   -                    -                      0%
Other Expenditure 78                67                 (11)                  (14%)
Capital Financing -                   -                    -                     
Gross Expenditure 79,125         81,520          2,395              3%
Income (25,784)        (26,686)         (902)                3%
Net Expenditure 53,341         54,834          1,493              3%

Page 18

Appendix 3a
PLACE
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Waste Services
Movement: There has been an unfavourable movement of £0.389m since P5 due to an under recovery of
income of £0.203m due to the purple bin contract income, a forecasted increase in employee costs of
£0.251m, and transport costs of £0.035m, this has been partially offset by a favourable movement within Third
Party Payments of £0.112m mainly due to decreased costs from kerbside recyclate contracts.
4,944 683 14%
Employee costs: One off employee costs and back payments for overtime due to the pay award has impacted
the budget position from period 5. Overtime and vehicle check assumptions have also been adjusted to reflect
the position at period 8. There remains a challenging cumulative sickness absence rate of 18.8 days per
employee from April 2024 to October 2024. A robust absence monitoring process is in place and a dedicated
resource has been recruited to monitor and review the absence management process in Waste, through
assisting supervisors with absence management meetings, referrals to occupational health etc and to support
employees return to work. The statutory nature of the service requires additional resources and/or overtime to
cover unforeseen absences resulting in additional costs. To help mitigate against this, resources out-with
Waste Collections have received HGV training to help provide cover for collections. Weekly budget meetings
are also being held between the Waste Ops Management Team and Finance. An overall review of the Waste
service in light of legislative changes and current service demands is ongoing.
259 105 41%
Transport Costs: Additional vehicles are in place to deal with ongoing pressures and demands, a reduction of 2
vehicles has been implemented from the end of November.  Transport needs are continuously under review
and flexed depending on the operational needs of the service.
6,743 (49) (1%)
Third Party Payments: Underspends from the kerbside recyclate contracts of £0.136m and £0.051m from
organics contract, partially offset by overspends in diverted waste of £0.106m and £0.041m in the Clyde Valley
Contract.
(3,857) 188 (5%)
Income: A projected under-recovery in purple bin contract income of £0.271m due to reductions in recyclate
market prices and increased contamination levels resulting in a lower rate per tonne. To counter this the Waste
Awareness Team are promoting a Right Stuff Right Bin comms campaign, putting new stickers on bins to
remind residents what each bin should be used for and operational staff are removing contaminants where
possible to try and reduce contamination levels. This under-recovery is partially offset by forecasted over-
recovery in the sale of other recyclates.
(25) Other minor movements
902
Note 2 Municipalisation Advertising
Movement: There has been no movement from P5.
(123) 50 (41%) Income: An under recovery of £0.050m primarily due to lead in time for vehicle advertising and unfavourable
market conditions.
50
Note 3 Employability & Skills
Movement: There has been a favourable movement of (£0.148m) since P5 due to the availability of external
funding releasing core budget.
3,572 (150) (4%) Third Party Payments: Underspend of £0.150m as Employability are using all external funding available,
resulting in an underspend in the core budget. It is anticipated that external funding will be reduced in 2025/26.
(11) Other minor movements.
(161)
Note 4 Property Management and Investment
Movement:  There has been adverse movement of £0.039m since P5 due to an under-recovery of fee income.
2,433 (80) (3%) Employee Costs: There is a projected underspend of £0.080m due to vacancy management.
(1,263) 90 (7%) Income: There is a projected under-recovery of fee income of £0.090m.
20 Other minor movements
30

Page 19

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Property Maintenance Costs
Movement: There has been an adverse movement of £0.395m since P5 largely due to RAAC costs of £0.245m
and reactive maintenance costs of £0.150m.
7,151 395 6%
Property Costs: There is a projected £0.245m overspend largely due to the residual RAAC costs at Ardrossan
Academy and projected RAAC costs at Mid Dykes Depot. In addition there is a further projected £0.150m
overspend due to essential reactive maintenance.
395
Note 6 Internal Transport
Movement: There has been a favourable movement of (£0.042m) since P5 which is primarily due to the over-
recovery in hire of pool vehicles income.
4,682 276 6% Transport Provision Costs: There is a projected overspend of £0.276m due to a higher number of pupils
requiring transport and an increase in tendered costs in private contracts for the provision.
1,787 (134) (7%) Fuel: There is a projected underspend in fuel of £0.134m due to a decrease in fuel prices.
1,228 81 7% Repairs & Maintenance: There is a projected overspend of £0.081m in repairs and maintenance as a result of
price increases and maximising the life of assets due to replacement vehicle lead times. 
457 78 17% External Hires: There is a projected overspend of £0.078m mainly due to hire of additional vehicles (pending
delivery of replacements) and plant hire.
(3,101) (65) 2%
Income: There is a projected over-recovery of £0.050m in bus transport income and a projected over-recovery
of £0.050m in hire of pool vehicle income which will support overspends in repairs and maintenance as end of
life vehicles in pool are being retained for longer.  These are offset with a projected under-recovery of £0.035m
in Enterprise car income.
13 Other minor movements
249

Page 20

Appendix 4
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 94                94                 -                      0%
Housing and Public Protection
Building Services (2,548)          (2,548)           -                      0% 1         
Property Governance -                   -                    -                     
Planning Services 283              140               (143)                (51%) 2         
Protective Services 1,616           1,616            -                      0%
Other Housing 2,549           2,523            (26)                  (1%) 3         
Total for Housing and Public Protection 1,900           1,731            (169)                (9%)
Connected Communities 11,782         11,874          92                   1% 4         
Net Total 13,776         13,699          (77)                  (1%)
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 24,137         24,250          113                 0%
Property Costs 2,953           2,902            (51)                  (2%)
Supplies and Services 7,107           7,102            (5)                    (0%)
Transport and Plant Costs 973              976               3                     0%
Administration Costs 221              228               7                     3%
Other Agencies & Bodies 11,035         11,038          3                     0%
Transfer Payments -                   -                    -                      0%
Other Expenditure 104              221               117                 113%
Capital Financing -                   -                    -                     
Gross Expenditure 46,530         46,717          187                 0%
Income (32,754)        (33,018)         (264)                1%
Net Expenditure 13,776         13,699          (77)                  (1%)

Page 21

Appendix 4a
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since period 5.
10,990 (74) (1%) Employees: An underspend of £0.074m in employee costs. This is due to vacancy management.
5,641 (182) (3%) Supplies & Services: An underspend of £0.182m in supplies and services. This is primarily due to an
underspend in materials as a result of a reduction in void kitchen and bathroom works.
3,194 195 6% Third Party Payments: An overspend in third party payments of £0.195m which mainly relates to additional
subcontractor costs for timber and damp works, storm damage and infrastructure improvements.
(23,408) 28 (0%)
Income: A projected under recovery of £0.028m. This is mainly due to an under recovery in void income of
£0.684m, which is primarily caused by reduced kitchen and bathroom works, and £0.300m in Non-Housing
works. This is partially offset by increased volumes of work within responsive repairs of £0.431m, timber &
damp works of £0.466m and wet room repairs of £0.071m.
33 Other minor movements
-
Note 2 Planning Services
Movement: There has been no significant movement since period 5.
(614) (143) 23% Income: This is primarily due to the forecasted over recovery of £0.130m for additional planning fee application
income.
(143)
Note 3 Other Housing
Movement: There has been a favourable movement of (£0.087m) since period 5 mainly due to a reduction of
£0.057m in projected employee costs due to vacancy management, £0.081m increase in projected over-
recovery of house & hostel rents, £0.051m increase in projected underspend in void rent loss offset by an
overspend in bad debt provision of £0.117m.
2,473 (51) (2%) Property Costs: A projected underspend of £0.074m in void rent loss offset by an overspend in property rents
of £0.023m.
104 117 113% Other Expenditure: A projected overspend of £0.117m in bad debt provision.
(5,878) (87) 1% Income: This is mainly due to a projected over-recovery in house & hostel rents of £0.081m.
(5) Other minor movements
(26)
Note 4 Connected Communities
Movement: There has been no significant movement since period 5.
6,360 130 2% Employee Costs: Overspend of £0.113m is a result of revised programming of implementation of the approved
savings for school libraries and to reduce public library opening hours by 20%. 
(1,480) (33) 2% Income: Projected over-recovery of room hire income of £0.033m due to hosting the banking hub in Kilwinning
which is a temporary arrangement.
(5) Other minor movements.
92

Page 22

Appendix 5
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,331 2,231 (100)             (4%)
SPT Concessionary Fares 286 286 -                   0%
Ayrshire Joint Valuation Board 973 932 (41)               (4%)
3,590 3,449 (141)             (4%) 1           
Other Corporate Costs
Pension Costs 1,981 1,981 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
23,248 21,284 (1,964)          (8%) 2           
Housing Benefits (51)               (235)             (184)             361% 3           
29,118 26,829 (2,289)          (8%)

Page 23

Appendix 5a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
There has been no movement from Period 5
3,590 (141)                -4% Projected underspend of (£0.141m) due confirmation of annual requisitions and applicable refunds.
(141)
Note 2 Other Corporate Items
There has been no movement from Period 5
23,248 (1,964)             -8%
The projected underspend is primarily related to centrally held inflationary cost provisions, which are being
applied to offset pressures reported across other services (£0.864m), additional income from employee benefit
schemes (£0.342m)and additional Scottish Government grant income not required in year (£0.758m).
(1,964)
Note 3 Housing Benefit
There has been a favourable movement of (£0.250m) from Period 5 due to updated Housing Benefit Subsidy
data
(51)             (184)                361% Projected overspend of £0.184m due to Housing Benefit Subsidy and Overpayment Recovery
(184)

Page 24

Appendix 6
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 15,885 15,885 - -
Contribution to Loans Fund Reserve 7,010 7,010 - -
Scottish Government Funding (370,262) (370,262) - -
Council Tax (65,681) (66,170) (489) 1% 1
Use of Earmarked Funds (9,174) (9,174) - -
Net Total (422,222) (422,711) (489) 0%
Growth in the Council Tax base (£0.752m) has been partly offset by an increase in the value of CTR claims
received, £0.144m, and increased Bad Debt Provision, £0.090m. Reported collection rates have shown an initial
improvement but still lag behind pre pandemic levels.
Note 1 Council Tax
Movement: There has been a favourable movement of (£0.225m) since period 5, primarily related to adjustments to
our Council Tax base, (£0.040m), a reduction in forecast CTR claims, (£0.130m) and improved prior year collection
forecasts (£0.062m) .

Page 25

Appendix 7
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,118 4,977 (141) (3%) 1
Property Costs
Responsive Repairs 7,361 7,755 394 5%
Void Repairs 4,023 4,301 278 7%
Planned and Cyclical Maintenance 5,201 5,944 743 14%
Aids and Adaptions 1,552 1,545 (7) (0%)
Other property costs 3,679 3,898 219 6%
Total for Property Costs 21,816 23,443 1,627 7% 2
Supplies & Services 2,297 2,071 (226) (10%) 3
Transport Costs 21 21 - 0%
Administration Costs 1,756 1,776 20 1% 4
Third Party Payments 3,877 3,938 61 2% 5
Transfer Payments 163 163 - 0%
Other Expenditure 490 490 - 0%
Capital Financing Costs 26,525 24,607 (1,918) (7%) 6
Gross Expenditure 62,063 61,486 (577) (1%)
Income
Council House Rents (60,201) (60,216) (15) 0%
Other Rents (473) 100 573 (121%)
Recharges (1,034) (1,027) 7 (1%)
Other Income (355) (343) 12 (3%)
Total Income (62,063) (61,486) 577 (1%) 7
Net Expenditure - - -

Page 26

Appendix 7a
HRA
BUDGETARY CONTROL 2024/25
REPORT FOR THE 8 MONTHS TO 30 NOVEMBER 2024
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
5,118 (141) -3%
(141)
Note 2
21,816 1,627 7%
1,627
Note 3
2,297 (226) -10%
(226)
Note 4
3,877 61 2%
61
Note 5
26,525 (1,918) -7%
(1,918)
Note 6
(62,063) 577 -1%
577
B/fwd from
2023/24
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/25
£m £m £m £m £m £m
11.590 - - - - 11.590
5.000 - - - (0.544) 4.456
2.000 - (0.059) - - 1.941
1.553 - - - - 1.553
0.300 - - - - 0.300
0.123 - - - - 0.123
20.566 - (0.059) - (0.544) 19.963
HRA reserves and balances
There is a projected underspend of £0.226m in supplies and services. This is primarily due to an underspend of
£0.218m in landscaping costs.
Property Costs
Movement - there has been an adverse movement of £0.104m since Period 5. This is largely due to an increase of
£0.111m in Planned and Cyclical Maintenance and £0.099m in other property costs. This is offset by a reduction in
Void repairs costs of £0.075m.
There is a projected overspend of £0.394m in Responsive Repairs due to the volume and scope of the works. A
projected £0.743m overspend in relation to Planned and Cyclical Maintenance, largely due to £0.230m costs in
relation to storm damage works resulting from adverse weather conditions early in 2024, £0.458m projected
overspend due to increased costs in relation to timber and damp works and a projected overspend of £0.100m in
relation to asbestos management. A projected overspend of £0.219m in other property costs, largely relating to
increased tenant charges of £0.126m and £0.050m in relation to maintenance of trees. In addition there are
projected overspends of £0.278m in Void Repairs.
Third Party Payments
Movement - there has been an adverse movement of £0.012m since Period 5.
There is a projected overspend of £0.061m largely due to a £0.029m greater ASB contribution than budgeted and a
£0.021m overspend in relation to consultant fees.
Section
Supplies and Services
Movement - there has been a favourable movement of £0.224m since Period 5 largely due to a projected
underspend in landscaping costs.
Employee costs
Movement - there has been a favourable variance of £0.141m since Period 5 due to vacancy management.
There is a projected underspend of £0.141m as a result of effective vacancy management.
Council House Building Fund
Sustainability Fund
Software licences
Transformation Programme
Tenant led budget
Unearmarked
Capital Financing Costs
Movement - there has been an adverse movement of £0.052m since Period 5 due to the reprofiling of the capital
programme.
A projected underspend of £1.918m in capital financing costs reflects continuing strategy to delay new external
borrowing by utilising cash balances, resulting in savings on external interest costs and changes in the profile of the
capital programme.
Income
Movement - there has been an adverse movement of £0.204m since Period 5 primarily due to an increased under
recovery in other rents following a review of overpayments.
An under recovery in income of £0.577m. This is largely due to an under recovery of £0.573m in Other Rents.

Page 27

Appendix 8
1) Budget Virements
Place
Roads - Supplies and Services P 0.076
Roads - Income for DPE charges P -0.076
Roads - Third Party Payments T 1.109
Roads - Additional Income T -1.109 0.000
Communities & Housing
Community Development - Employee Costs T 0.521
Community Development - Transport Costs T 0.005
Community Development - Supplies and Services T 0.053
Community Development - Administration Costs T 0.001
Community Development - Third Party Payments T 0.042
Community Development - Sportscotland Grant Income T -0.622 0.000
Education
FM- Employee Costs- realignment of Facilities Management Budgets P 0.347
FM - Supplies and Services P -0.347 0.000
0.000
Budget Management - 30 November 2024
Virement/Budget Adjustment Requests
2024/25
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m

Page 28

APPENDIX 9
Integration Joint Board
12th December 2024
Subject : 2024-25 – Month 7 Financial Performance 
Purpose : To provide an overview of the IJB’s financial performance as at
Month 7 (October). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2024-25 and the current overall projected year-
end overspend of £6.190m, reduced to £3.613m through already
identified financial recovery actions;
(b) notes the progress with delivery of agreed savings;
(c) approves the actions which are being taken to progress
financial recovery and that a further recovery plan will be
presented to the next IJB;
(d) notes the remaining financial risks for 2024-25; and
(e) approves the budget reductions which are detailed at
paragraph 2.10 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
MDT Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework
MDT Multi-Disciplinary Team

Page 29

1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of October further work is undertaken following the
month end to finalise projections, therefore the projected outturn position is as current
and up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £6.190m (1.9%) for 2024-25,
reduced to £3.613m through identified financial recovery actions.    There is an
increasing risk to achieving financial balance during 2024-25, the projected outturn
position is summarised below with the residual risk following already identified
financial improvement actions: 
Split 
TOTAL Health/
NHS AA
Social
Care/NAC
Projected Overspend @ mth7 £6.190m £1.288m £4.902m
Less Financial Recovery Plan Projections £2.577m £0.223m £2.354m
Residual Risk £3.613m £1.065m £2.548m 
1.3  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
1.4 Improvement:
• Specialist Rehab Wards (Douglas Grant/Redburn) 
• UASC Grant Income
• Transition slippage 
Deterioration:
• Equipment and Adaptations
• PD care packages
• MH Lead partnership – including payroll turnover, LD in-patients but this was
partially offset by improvements in Adult in-patients
• Children with Disabilities
• Looked after Children payments 
1.5 The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds.  NHS Ayrshire and Arran and North Ayrshire Council are not in a financial

Page 30

position to make interim funds readily available, therefore it is imperative that the IJB
continues to support the process of development of the Financial Recovery Plan and
the actions required to work towards financial balance by the year-end. 
1.6 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The overspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism.  There is a requirement for the 3 IJBs to be
aware of the position for Lead Partnership services and plans to deliver services from
within allocated budget, on that basis further information will be brought forward with
further detail on Lead Partnership services. 
1.7 The 2024/25 financial position is being adversely impacted by several factors outwith
the control of the IJB. 
• Formal confirmation by The Scottish Government of the 2024/25 funding for
the Mental Health Outcome bundle saw a 3.5% reduction from 2023/24 which
equates to £0.350m and the service are currently working through the
implications of this reduction. It is expected that this can be managed within
the carry forward reserves from 2023/24 so there is no impact on 2024/25 but
the service is exploring the implications of bringing spend within budget in
2025/26. 
• Children’s residential placement contract inflation – Scotland Excel negotiate
rates for several national framework contracts and the rates agreed to date
are significantly higher than the 5.94% increase assumed as part of the
Scottish Living Wage increase. Rates which are agreed to date are included
in the projection and those still to be agreed are assumed to have an increase
based on the average of rates agreed to date.  Overall, the estimated impact
is an increase to the projection of £0.486m. 
• Local Government and Health Pay Award Shortfall - it is unknown at this stage
if this will be fully funded and the potential cost is not included in the month 7
projected outturn. 
• National Care Home Contract (NCHC)– the recent increase to the NCHC rate
to reflect the impact of the nursing pay award resulted in an additional
unfunded cost of £0.156m. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.

Page 31

2.2 FINANCIAL PERFORMANCE – AT MONTH 7 
At month 7 against the full-year budget of £324.231m there is a projected year-end
overspend of £6.190m (1.9%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £4.902m in social care services and a projected
overspend of £1.288m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
Appendix F provides information on the costs of bank and agency staff as requested
at the August IJB. 
2.3 Health and Community Care Services 
Against the full-year budget of £90.803m there is a projected overspend of £6.235m
(6.9%) (£0.092m adverse movement) and the main variances are: 
a) Care home placements – is overall projected to be £0.555m overspent.   
The budgeted number of permanent placements was 765 and at month 7 there
were 790 placements. The projected overspend is £1.068m (£0.004m favourable)
on permanent placements, £0.190m (£0.018m favourable) on interim placements
and respite placements are projected to be online (no change). The plan to
manage down the number of permanent placements to reach the target is
challenging due to the need to minimise delayed discharge from hospital and to
continue to support those in critical and substantial need in the community. 
The overspend is partially offset by income recovered from charging orders which
is projected to be £0.703m over recovered (no movement). This income is
challenging to predict as it depends on the length of the legal process and time
taken to sell the property that the charging order is registered to. 
b) Care at home is projected to be £2.710m overspent (net £0.038m adverse
movement). The position reflects the cost of meeting the significant demand and
level of provision for care at home support.  The movement consists of a
favourable movement of £0.073m in in-house services offset by an adverse
movement of £0.111m relating to purchased care at home following the
finalisation of all costs prior to the transfer of services to in house provision and

Page 32

the ongoing commitment of those service users that selected to continue with a
purchased service under option 2. 
c) Physical Disability Services – projected overspend of £0.898m (£0.108m
adverse) split as follows: £1.255m over in residential placements, £0.023m over
in direct payments and £0.380m under in community care packages. 
d) Integrated Island Services is projected to overspend by £0.565m (£0.026m
adverse movement).  The most significant variance is a projected overspend at
Montrose House of £0.422m (no movement) which relates to the net overspend
on agency staff (i.e. net of underspend on employee costs). A new contract to
procure agency nursing staff commenced in November which will reduce the
hourly costs moving forward and this is reflected in the projection. 
e) Specialist Rehab wards – projected underspend of £0.014m (£0.140m favourable
movement) (Redburn ward £0.093m overspend and Douglas Grant £0.107m
underspend).  The overspend is due to cover costs for vacancies as well as
supplementary staffing for patients who require one to one support. 
f) Wards 1 and 2 – Projected overspend of £0.786m (£0.026m adverse movement)
due to use of supplementary staffing. 
g) District Nursing – projected to overspend by £0.071m mainly due to an overspend
on nursing supplies. 
h) Equipment and Adaptions – projected overspend of £0.380m (£0.080m adverse
movement) including an overspend on the supply of stairlifts. 
2.4 Mental Health Services 
Against the full-year budget of £108.758m there is a projected overspend of £1.887m
(1.7%) (adverse movement of £0.919m) prior to the re-allocation of the Lead
Partnership variance to East and South HSCP.  The main variances are: 
• Learning Disabilities are projected to overspend by £0.756m (£0.032m
favourable movement) across community care packages, direct payments
and residential placements.  This improvement reflects the positive impact of
assertive reviews of care packages. 
• Community Mental Health services are projected to underspend by £0.365m
(£0.016m adverse) across community care packages, direct payments and
residential placements. The main reason for underspend is the availability and
capacity of adult community providers to deliver new packages of care. 
• There is a projected underspend of £0.075m (£0.031m adverse movement) in
relation to the cost of Hospital Based Complex Continuing Care (HBCCC), this
reflects the impact of change in provision for these services.

Page 33

• The Lead Partnership for Mental Health is projected to be £1.560m overspent
(£0.902m adverse movement) and the main variances are as follows: 
• Adult Inpatients – overspent by £0.442m (£0.186m favourable) due to
overspends in supplementary staff for enhanced observations (1:1 and
2:1) and use of bank staff. There is a favourable impact from the
opening of the adult mental health assessment hub which has seen the
adult inpatient areas with reduced occupancy. 
• The UNPACS (Unplanned Activities) budget – projected overspend is
£0.739m (£0.060m adverse movement) based on current placements. 
The actual cost of the future placements may be different from the
estimated cost assumed in the projection.  These placements are for
individuals with very specific needs that require a higher level of
security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women,
people with a learning disability or people with neurodevelopmental
disorder. This can necessitate an UNPACs placement with a specialist
provider which can be out-of-area.  The nature of mental health
UNPACs spend is that it is almost exclusively on medium or long term
complex secure residential placements which are very expensive so a
small change in placements can have a high budgetary impact. Due to
the complexity and risk involved, transitions between units or levels of
security can take many months. Applications to approve a placement
are made to the Associate Medical Director for Mental Health who
needs to be satisfied that the placement is appropriate and unavoidable
prior to this being agreed. A new group has been established to review
the UnPACS budget and placements with a wider service
representation. 
• Learning Disability Services – projected to underspend by £0.284m
(£0.254m adverse movement). The adverse movement is due to an
increased use of bank and agency staff in Ward 7A. This position is
after recharging other areas on a cost basis for two outwith authority
placements which have incurred additional costs in relation to usage of
supplementary staffing due to sustained enhanced observations. There
is a risk in relation to recovering this income as the two areas receiving
the charges are currently refusing to pay and legal advice is being
sought. The projected income due from prior and the current year is
£2.308m.  
• Elderly Inpatients – projected overspend of £0.528m (£0.113m adverse
movement) due to the use of supplementary staffing.  The elderly
mental health wards continue to operate at full occupancy and at times

Page 34

with waiting lists, with several patients who are on enhanced
observations and bank costs remain high. 
• Eating Disorders – projected to overspend by £0.104m (£0.104m
adverse movement) due to the staffing level being higher than the
funding allocation. This will be considered alongside the overall
resource allocation for future years. 
• Psychiatry – is projected to overspend by £0.200m (£0.200m adverse
movement) due to the use of agency staff. A mitigation plan is being
developed. 
• MH Pharmacy – is projected to overspend by £0.661m (£0.076m
adverse movement) due to increased demand and cost of medicines
and in particular the cost of Buvidal. 
▪ Innovation Fund – projected underspend of £0.112m due to slippage
within some of the projects and not all of the funding has been
allocated. 
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £0.500m
(£0.319m adverse movement) in 2024-25.  Further information is
included in the table below: 
Vacancy Savings Target (£1.116m)
Projected to March 2025 £1.616m
Over/(Under) Achievement £0.500m
2.5 Children and Justice Services 
Against the full-year budget of £43.958m there is a projected overspend of £1.758m
(4%) (£0.070m adverse movement) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£2.313m (£0.262m adverse movement). Some of these costs are offset by the
contribution from the Home Office for Unaccompanied Asylum-Seeking Children
which is detailed below. The main areas within this are noted below: 
• Following budget investment of £4m the children’s residential placements are
overspent by £1.988m (£0.090m adverse movement) based on 30
placements at month 7. This demonstrates a reduction of 7 places since the
start of the financial year. There are a number of factors leading to this
challenging position:

Page 35

• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking
Children (UASC) under the National Transfer Scheme and to support
trafficked young people who have been identified in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases
is shared 50/50 with Education services. 
• Contractual inflation has increased the projected costs of residential
places which is outwith the control of the service. 
Children’s Services are continuing to work with other services including Education
and Housing to address the challenges through the work of the ‘Brighter Pathways’
Programme Board and associated workstreams. This forms part of the
Transformation Plan which was approved at the March IJB. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.721m underspent (£0.040m adverse movement). 
• Children with disabilities – there is a net projected overspend of £0.641m
(£0.059m adverse movement) across residential placements, direct
payments and community packages. The adverse movement is due to the
confirmed costs of a recent placement being higher than previously
estimated. 
• Residential respite – placements are overspent by £0.135m (no movement).
These short-term placements are used to prevent an admission to full time
care or to avoid placement breakdown. 
• Employee costs – are projected to overspend by £0.200m (adverse
movement of £0.028m), largely due to staffing levels in the children’s houses. 
b) Head of Service – is projected to underspend by £0.842m (£0.167m favourable
movement). This consists of a projected overspend due to the planned saving of
£0.233m in relation to the staff reconfiguration in the children’s houses which was
not achieved in 23-24 and this is offset by the grant funding in relation to
Unaccompanied Asylum-Seeking Children, which is projected to amount to
£1.060m (£0.096m favourable movement) and which contributes to costs incurred
across a number of C&F service areas.

Page 36

c) C&F Health Team – is projected to overspend by £0.232m (£0.014m favourable
movement) mainly in relation to the Band 6 to 7 regrade for Health Visitors and
the progression of posts up the Band 7 scale. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
This is projected to be on-line. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £2.958m
(£0.092m favourable) and the main areas of underspend are: 
• There is projected slippage on the LD and MH transition funding of £0.880m
(£0.097m favourable) due to delays in children transitioning into adult services
and actual costs being less than estimated.  This involves complex planning
by services with service users and families and can change over time based
on assessed need when moving into adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   The net impact is neutral, but Appendix A shows this position
for each element.
• Blue Badge income – a projected over recovery of £0.035m.
• Software licences – a favourable movement of £0.031m (Carefirst)
• Medical fees and other supplies– favourable movement of £0.034m 
• An over-recovery of payroll turnover of £1.686m for social care services and
an over-recovery of payroll turnover of £0.317m for health services as outlined
in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (3.301m) (1.522m)
Projected to be achieved by
March 2025
4.987m 1.839m
Over/(Under) Achievement 1.686m 0.317m 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.

Page 37

As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. This has led to a significant increase in the level of turnover
when projected to the year end.   
The turnover target for the North Lead Partnership for Mental Health services is
detailed separately within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2024-25 budget included £10.290m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 7
£m
Red - 0.586
Amber 0.523 -
Green 9.767 -
Blue - 9.704
TOTAL 10.290 10.290 
b) The main area to note is that the red savings have increased since month 6
as the saving in relation to care homes and recovery and rehab look unlikely
to be achieved. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount (£000)
1 Transfer to capital re West Road (281)
2 Training Grade adjustments (51)
3 Hollybush House contract – contract ceased and
funding returned (1,424)
4 Pharmacy Tariff Reduction (31)

Page 38

5 Huntington’s funding – return to East HSCP (5)
6 Reduction in MDT funding from estimated (316) 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis. 
The outturn in relation to North Lead Partnership services is not fully attributed to the
North IJB as a share is allocated to East and South Partnerships; similarly, the impact
of the outturn on East and South led services is shared with North. At Month 7 the
MH lead partnership is projected to overspend by £1.560m (£0.511m NRAC share
for East and £0.446m for South). 
South HSCP (month 6 info) – projected overspend of £0.581m of which £0.215m
will be allocated to North. The variance is mainly due to an overspend of £0.512m in
the community store.  This includes the costs of replacing mattresses, repairs and
maintenance contract and equipment costs. There is also a projected overspend of
£0.074m in the continence service and an underspend £0.006m in the Family Nurse
Partnership. 
East HSCP (month 7 info) - projected underspend of £0.200m (£0.160m adverse)
in total (of which £0.074m will be allocated to North). The main variances are: 
Allied Health Professions (Lead Partnership)
There is a projected underspend of £0.258m (£0.302m at month 6) on AHP services
hosted by East Ayrshire for the current year, which mainly relates to staffing savings
in Physiotherapy / MSK and Podiatry services and is partially offset by increased
Orthotics costs. The projected outturn movement from month 6 relates to planned
recruitment to vacant posts in the current financial year. 
Primary Care and Out of Hours Services (Lead Partnership)
There is a small projected overspend of £0.044m (£0.064m projected underspend at
month 6) on the Primary Care Lead Partnership budget, with additional costs in Out
of Hours services £0.364m (£0.321m at month 6), with work ongoing to mitigate
increased costs as far as possible over the course of the 2024/25 financial year and
going forward, as well as additional Primary Care contracting and support costs
£0.041m (£0.027m at month 6). These additional costs are largely offset by a
projected underspend in Dental services totalling £0.346m (£0.344m at month 6),
where staffing numbers are running at less than establishment. Recruitment over the
remainder of the financial year has the potential to impact further on the projected
outturn position.

Page 39

Prison and Police Healthcare (Lead Partnership)
The £0.084m (£0.101m at month 6) projected underspend at month 7 is largely due
reduced staffing costs (at month 7 average actual WTE 30.50 v budgeted WTE
35.15), partially offset by increased prescribing costs £0.293m, which includes more
expensive opioid replacement therapy costs which is an unbudgeted cost in 2024/25. 
Other Services (Lead Partnership)
The £0.098m (£0.106m at month 6) projected overspend is due to increased Area
Wide Evening Services costs, mainly due to additional staffing costs including high
use of bank staff. Work is ongoing to reduce costs as far as possible in the current
financial year and going-forward. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.  
1.          Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how these compare to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive.  
The HSCPs require to agree their final share of the baseline with each other,
however the aggregate will remain unchanged. The table below shows the cost of
the historic baseline at 2022/23 prices.  
IJB
Baseline at
2022/23
prices (£)
East 26,215,888
North 35,007,962
South 28,371,789
Total 89,595,639  
The annual budget for Acute Services is £452.0 million.  The directorate overspent
by £20.4 million after 7 months. This was caused by overspends on agency medical
and nursing staff, together with drug expenditure including the New Medicines Fund,
equipment and supplies. These have been required due to the level of operational
pressure being experienced, in common with many other areas in Scotland. Whilst
unfunded beds remained open across both main hospital sites during October,
progress is now being made in reducing these with commensurate financial
improvement expected to follow.

Page 40

There is a material underlying deficit caused by:  
• Unachieved efficiency savings
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and
Arran acute hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. Initial work has commenced to develop a joint strategic
commissioning plan for the provision of unscheduled care services, which will outline
these services will be delivered over the medium-term using the set aside resources
available. This will support a shift in the balance of care into the community and
support a reduction in the number of acute beds. 
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position. 
• The recent announcements by Scottish Government in relation to public
sector finances and in-year spending reductions will impact on current and
future funding, including for 2024-25 pay awards, which have recently been
settled for local government and NHS but the funding position is not yet clear.
• Continued growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The provider market and the ongoing ability to source packages of care for
service users.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• The ongoing review of the Integration Scheme.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• The wider system financial challenges, especially the financial position of
NHS Ayrshire and Arran Health Board, their financial deficit and the risks
around further escalation in the national framework for financial escalation. 
North Ayrshire IJB have already discussed our position in relation to the
request for payment for delayed discharges last financial year.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.

Page 41

• The IJB free general fund reserves are estimated to be fully used during this
financial year, leading to an increased risk of requiring additional in-year
financial contributions from NHS Ayrshire and Arran and North Ayrshire
Council to break even. 
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The use of supplementary staffing for enhanced observations across a
number of service areas.
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. Non-
recurring funding has been provided to meet costs associated with this but it
is unclear whether this will be sufficient.
• Scot Excel inflationary increases for children’s service are significantly higher
than assumed.
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire. 
These risks will continue to be monitored during 2024-25. 
2.13 RESERVES 
The IJB reserves position is summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2024 0.357  3.379 1.774 5.510
Anticipated Drawdown (0.357)  (3.379) (1.202) (4.938)
Balance – 31 March 2025 -  - 0.572 0.572 
The £1.774m HSCP earmarked reserve relates to the Service Redesign and Change
Fund which is fully committed. 
Further detail on the reserves is given in Appendix D.

Page 42

2.14 Financial Recovery Plan 
The IJB set a balanced budget for 2024/25 on 14th March 2024. This did not require
any draw on reserves but did include the approval of £10.290m of savings to achieve
financial balance. 
Following the finalisation of the 2023/24 outturn position, the IJB agreed some initial
recovery actions at the meeting in June. In line with the requirements of the
integration scheme, work has continued to develop the financial recovery plan and
identify further targets for financial improvements. The current plan is outlined in full
at Appendix E. 
There has been progress towards some of the targets, and these are already
reflected in the current projected outturn of £6.190m overspend. Further work is
required to deliver on the balance of these targets as well as the additional targets
which have now been identified. 
Services will work towards implementing the recovery plan to deliver on these cost
reduction targets while carefully managing the level of risk. This will include the
preparation of equality impact assessments. 
It is recognised that there needs to be further savings identified to move towards a
breakeven position. Any decisions to implement changes which have significant
impact on service delivery and the wider system will be discussed at the Finance
Working Group before being brought back to the IJB for further approval as part of
the financial recovery plan. 
MANAGEMENT ACTIONS/CONTROLS: 
Other management actions which have been implemented include: 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working.
• Ongoing review of future year savings or transformation programmes to
identify scope for acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund
(ILF) Scotland.

Page 43

GOVERNANCE: 
• In order to facilitate greater scrutiny of the financial position and the delivery
of the financial recovery plan during 2024/25, the IJB agreed at the June
meeting to establish a ‘Finance Working Group’, chaired by the IJB Vice Chair.
The Director and Heads of Service will be members of the group. This will
meet monthly to facilitate increased oversight and scrutiny of the financial
position and transformation programme as well as detailed budget planning
for future financial years. Meetings have now been scheduled to the end of
the year.  
To date the Finance Working Group has met three times and covered care at
home, care homes, charging income, financial inclusion, an overview of the
budget and the Brighter Pathways project. The next meeting will review
Complex Care, Addictions Prescribing and an update to the Medium-Term
Financial Outlook. 
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams, including
line by line reviews of all budget areas.  Review and enhancement of
frequency and level of financial information provided to support oversight and
decision making in line with financial constraints, with an added focus on areas
of underspend to maximise opportunities to delay or stop spend and contribute
to the overall financial challenge. 
INTEGRATION SCHEME 
The Integration Scheme describes the required approach where there is a projected
overspend: 
The Chief Officer will deliver the Outcomes within the total delegated resources (paid
and Set Aside) and where there is a forecast overspend against an element of the
operational budget, the Chief Officer, the Chief Finance Officer of the Integration
Joint Board and the appropriate finance officers of the Parties must agree a recovery
plan to balance the overspending budget, which recovery plan shall be subject to the
approval of the Integration Joint Board. If the recovery plan is not successful the
Parties will consider making interim funds available based on the agreed percentage 
contribution for joint responsibilities, as outlined above, with repayment in future
years on the basis of a revised recovery plan agreed by the Parties and Integration
Joint Board. 
There is an increasing risk to achieving financial balance during 2024-25, the
projected outturn position is summarised below with the residual risk following
already identified financial improvement actions and illustrates the current estimated
risk exposure to the IJBs funding partners:

Page 44

Split 
TOTAL Health/NHS
AA
Social
Care/NAC
Projected Overspend @ mth7 £6.190m £1.288m £4.902m
Less Financial Recovery Plan Projections £2.577m £0.223m £2.354m
Residual Risk £3.613m £1.065m £2.548m 
3.  PROPOSALS
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2024-25 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2024-
25. 
4. IMPLICATIONS  
4.1 Financial
The outturn is an overall year-end overspend of £6.190m (1.9%). The report outlines
the main variances for individual services.  The IJB unearmarked reserve balance is
projected to be zero by the end of the financial year and there is an ongoing risk in
relation to the £3.613m of the overspend where financial recovery improvement
actions require to be identified.  This current position poses a financial risk to North
Ayrshire Council and NHS Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.

Page 45

The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
The ‘financial viability of the HSCP’ risk on our strategic risk register has increased
the risk score to reflect the 23/24 outturn and current projected 24/25 overspend. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2024-25 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout
2024-25. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION 
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director 
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]-

Page 46

PUBLIC INFORMATION
2024-25 Budget Monitoring Report–Objective Summary as at 31st October 2024                                                                 Appendix A       
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 71,092 76,226 5,134 19,711 20,812 1,101 90,803 97,038 6,235 6,143 92
: Locality Services 30,262 31,787 1,525 5,628 5,699 71 35,890 37,486 1,596 1,541 55
: Community Care Service Delivery 36,761 39,548 2,787 0 36,761 39,548 2,787 2,805 (18)
: Rehabilitation and Reablement 2,124 2,508 384 0 2,124 2,508 384 327 57
: Long Term Conditions 917 946 29 9,891 10,771 880 10,808 11,717 909 931 (22)
: Community Link Workers 334 328 (6) 0 0 0 334 328 (6) 0 (6)
: Integrated Island Services 694 1,109 415 4,192 4,342 150 4,886 5,451 565 539 26
MENTAL HEALTH SERVICES 34,128 34,530 402 74,630 76,115 1,485 108,758 110,645 1,887 968 919
: Learning Disabilities 25,690 26,446 756 555 555 0 26,245 27,001 756 787 (31)
: Community Mental Health 6,416 6,051 (365) 1,794 1,794 0 8,210 7,845 (365) (381) 16
: Addictions 2,022 2,033 11 1,991 1,991 0 4,013 4,024 11 10 1
: HBCCC 0 0 0 353 278 (75) 353 278 (75) (106) 31
: Lead Partnership Mental Health NHS Area Wide 0 0 0 69,937 71,497 1,560 69,937 71,497 1,560 658 902
CHILDREN & JUSTICE SERVICES 38,783 40,309 1,526 5,175 5,407 232 43,958 45,716 1,758 1,688 70
: Irvine, Kilwinning and Three Towns 2,978 3,017 39 0 0 0 2,978 3,017 39 54 (15)
: Garnock Valley, North Coast and Arran 3,097 3,134 37 0 0 0 3,097 3,134 37 31 6
:Intervention Services 1,622 1,622 0 0 0 0 1,622 1,622 0 4 (4)
: Care Experienced Children & Young people 27,127 29,440 2,313 0 0 0 27,127 29,440 2,313 2,051 262
: Head of Service - Children & Families 1,074 232 (842) 0 0 0 1,074 232 (842) (675) (167)
: Justice Services 2,472 2,472 0 0 0 0 2,472 2,472 0 0 0
: C&F Health Team 413 392 (21) 4,447 4,679 232 4,860 5,071 211 223 (12)
: Lead Partnership NHS Children's Services 0 0 0 728 728 0 728 728 0 0 0
CHIEF SOCIAL WORK OFFICER 1,538 1,544 6 0 0 0 1,538 1,544 6 (1) 7
PRIMARY CARE 0 0 0 53,109 53,186 77 53,109 53,186 77 0 77
ALLIED HEALTH PROFESSIONALS 0 10,876 10,877 1 10,876 10,877 1 0 1
MANAGEMENT AND SUPPORT COSTS 10,620 8,454 (2,166) 4,569 3,777 (792) 15,189 12,231 (2,958) (2,866) (92)
OUTTURN ON A MANAGED BASIS 156,161 161,063 4,902 168,070 170,174 2,104 324,231 331,237 7,006 5,932 1,074
Over/
(Under)
Spend
Variance at
Period 6
Movement in  
variance
from Period
6
TOTAL
Partnership Budget - Objective Summary
Council Health
2024/25 Budget

Page 47

PUBLIC INFORMATION 
TOTAL Budget Budget
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Return Hosted Over/Underspends East 0 0 0 0 (511) (511) 0 (511) (511) (215) (296)
Return Hosted Over/Underspends South 0 0 0 0 (446) (446) 0 (446) (446) (188) (258)
Receive Hosted Over/Underspends South 0 0 0 0 215 215 0 215 215 215 0
Receive Hosted Over/Underspends East 0 0 0 0 (74) (74) 0 (74) (74) (133) 59
OUTTURN ON AN IJB BASIS 156,161 161,063 4,902 168,070 169,358 1,288 324,231 330,421 6,190 5,611 579
Over/
(Under)
Spend
Variance at
Period 6
Movement in  
variance
from Period
6
Partnership Budget - Objective Summary
2024/25 Budget
Council Health

Page 48

PUBLIC INFORMATION
2024-25 Savings Tracker          Appendix B 
Social Care:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 7
2024/25
Saving
Description of the Saving
Children, Families & Criminal Justice
Service redesign Amber Blue 0.123 Restructure areas of specialist service provision including
substance use and corporate parenting, embedding the roles and
functions of those teams within our locality-based early intervention
approaches and strategic planning including engagement.
Community Care & Health
Review of Day Care provision Amber Blue 0.100 Carry out a review and streamline day care provision.
Sensory Impairment Team Green Blue 0.062 Remove the dedicated management post and realign the team into
core social work teams.
Care Home places Green Red 0.375 Reduce the number of funded care home places by 15, leaving
budgetary provision for 765 places at average cost.
Charging for community alarm provision
to sheltered housing tenants
Amber Blue 0.200 Introduce a charge for community alarm provision in council
sheltered housing units to ensure an equitable approach across all
housing tenures.
Montrose House capacity Green Red 0.111 Restrict the capacity at Montrose House care home to the current
level of residency.
Voluntary Early Release Green Blue 0.174 Recurring savings achieved by the release of back-office staff
through the council's voluntary early release scheme.
Carers Strategy funding Green Blue 0.384 Utilise the remaining Carer's Strategy funding to invest in respite
provision and short breaks for carers and to support existing
investments in services which support unpaid carers.
Increase to charging Green Blue 0.131 Increase charges for non-residential care by 10% and charges for
residential care by 5%
Remove vacant posts Green Blue 0.280 Remove a number of vacant posts across support services.
Employers' superannuation contributions Green Blue 7.238 Align the budget to the new employer superannuation contribution
rates from 1st April 2024.
Payroll Turnover Green Blue 0.077 Increase targets for payroll turnover through the recruitment
process.
TOTAL SOCIAL CARE SAVINGS 9.255
North Ayrshire Health and Social Care Partnership
2024/25 Savings
Support Services and Partnership-wide savings

Page 49

PUBLIC INFORMATION 
Health:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 7
2024/25
Saving
Description of the Saving
Hospital Based Complex Continuing
Care (HBCCC) provision
Green Blue 0.500 Align the budget to the level of ongoing need for HBCCC provision.
Increase recharge to East Ayrshire for
beds at Woodland View
Green Blue 0.021 Apply an inflationary increase to the recharge to East Ayrshire
HSCP.
Community Recovery and Rehab
provision
Amber Red 0.100 Review and streamline a range of current provisions to remove
duplication.
Enhanced ICT Green Blue 0.100 Carry out a review of the service delivery model and release
recurring staffing savings.
Payroll Turnover Green Blue 0.314 Increase targets for payroll turnover through the recruitment
process.
TOTAL HEALTH SAVINGS 1.035
TOTAL NORTH HSCP SAVINGS 10.290

Page 50

PUBLIC INFORMATION
2024-25 Budget Reconciliation               Appendix C 
COUNCIL Period Permanent or
Temporary £'m
Initial Approved Budget 156.190
Adjustments to baseline (0.574)
Less Resource Transfer 23/24 (24.640)
Revised Budget 130.976
Resource Transfer 24/25 1-3 P 24.919
Realign Girfec Team To Connected Communities1-3 P (0.073)
ICT Budget Transfers 1-3 P (0.006)
CJSW Funding 2425 1-3 T 0.053
Childrens Living Wage Allocation 1-3 T 0.525
ICT Budget Transfers 6 P -0.002
ICT Budget Transfers 6 P -0.003
Post Realigned from the Policy,
Performance & Elections Team 6 P 0.059
Transfer to FM Services re Cleaning
Services at West Road 6 P -0.01
Transfer to Capital re West Road 7 T -0.281
Transfer from NAC Commercial Waste 7 T 0.007
Roundings 7 -0.003
156.161
HEALTH Period Permanent or
Temporary £'m
Initial Budget exc set aside 157.894
Add Resource Transfer 23/24 24.640
Month 10-12 Adjustments and adjusting
for the full year impact of part years
amounts and temporary funding.
(0.033)
Revised Budget P 182.501
Add resource Transfer 24/25 (24.919)
North Superannuation 24/25 uplift 1 1.134
MH: ANTICIPATE HOLLYBUSH COMBAT
STRESS 24/25 1 1.424
MH: ANTICIPATE DELIVERY OF
VETERAN SPECIFIC 24/25 1 0.105
MH: ANTICIPATE PERINATAL MH,
INFANT MH (INCL MNPI) 24/25 1 0.750
Training grade ADJ - April 1 0.063
Pecos Nurse Post 1 (0.018)
Script Switch To Pharmacy 1 (0.002)
Breastfeeding Pay Award - South 2 0.005
Nest - South 2 0.066
24-25 Bwg Foxgrove North 2 0.033
24-25 E Bwp Breast Feeding - North 2 0.005
24-25 E Bwp Huntingtons North 2 0.005
24-25 E Bwp Nest North 2 0.066
Phlebotomy Admin Returned 2 0.005
23-24 - 50% North Share to East - Tier 3
Weight Management 2 (0.077)
24-25 North Share to East - Tier 3 Weight
Management 2 (0.022)
Social Care Budget Reported at Month 7

Page 51

PUBLIC INFORMATION  
COUNCIL Period Permanent or
Temporary £'m
Anticipate Adp Afc Pay Uplift 3 0.091
Anticipate Adp Drug Prevalence 3 0.084
Anticipate Adp Lived & Living Exp 3 0.013
Anticipate Adp Mat 3 0.250
Anticipate Adp National Mission 3 0.296
Anticipate Adp Residential Rehab 3 0.134
Anticipate Adp Whole Family Approach 3 0.094
Training Grade Adj - Jun 3 (0.054)
Ambush North Rx 3 1.573
Ambush North Rx Cres 3 (1.477)
24-25 North Budget Paper - Office 365 (to
East) 3 (0.073)
24-25 North Budget Paper - Prison Pharm
Contract (to East) 3 (0.093)
South Mat Funding - Psychiatrist 3 0.029
Hd198: Early Intervention In Psychosis/ Body
Image And Social Media Resource 3 0.242
Hd203: Digital Mental Health Programme
Licence & Support 3 0.005
Reduction to the Working Week (mth 2 - 4) 4 0.105
Post to medical records 4 (0.037)
HD107: breast Feeding project funds 4 0.056
BBV 4 0.280
Rww 1/2 Hour Overtime M5 5 0.006
Min Anp Allocation 5 0.020
Ml: Nr Prog - Mappa 5 0.004
Training Grade Adj - August 5 0.051
Training Grade Vac Adj - August 5 (0.025)
MH: Return Hollybudh anticipated budget
back to reserves 24/25 5 (1.424)
HD271: Combat Stress Clinical services for
Veterans 5 0.583
Reduction to the Working Week 1/2 Hour
Overtime M6 6 0.002
Hd283 24-25 Pharmacy Tariff Red 6 (0.031)
Reduction to the Working Week 1/2 Hour
Overtime M7 7 0.003
Afc Partnership Pay Award 7 4.710
Training Grade Adj - October 7 (0.026)
24-25 E Bwp Huntington's North - Return To
East 7 (0.005)
Mh - Afc Reform Reduced Working Week 7 0.037
Pharmacy Tarrif reduction reinstated 7 0.031
Return Anticipated MDT 7 (0.316)
MDT reduction by SG 7 0.179
Anticipated budgets assumed in the report but
not yet allocated 7 1.628
Roundings 7 0.001
168.070
TOTAL COMBINED BUDGET 324.231
Health Budget Reported at Month 7

Page 52

PUBLIC INFORMATION
24-25 IJB Reserves Position      Appendix D 
Area of Reserves
Balance at
31 March
2024
2024-25
Anticipated
Draw Downs
Projected
Balance at
31 March
2025
: Alcohol & Drug Partnership 641 (641) 0
: Mental Health Action 15 57 (57) 0
: Service Redesign / Challenge Fund 1,774 (1,202) 572
: Community Living Change Fund 377 (377) 0
: Family Wellbeing Fund 1,313 (1,313) 0
: Wellbeing Fund 50 (50) 0
: Breast Feeding Network 26 (26) 0
: MH Recovery and Renewal 546 (546) 0
: Buvidal 23 (23) 0
: Brooksby 5 (5) 0
: Cossette Funding 4 (4) 0
: Expansion of Primary Care Estates 55 (55) 0
: GP Premises Improvements - tranches 1 and
2 63 (63) 0
: Mental Health Wellbeing in Primary Care 81 (81) 0
: Dental Practice Improvement 29 (29) 0
:Appropriate Adult Scheme 2 (2) 0
:Adult Tier 3 Weight Management Service 19 (19) 0
: Phlebotomy 22 (22) 0
: LD Health Checks 66 (66) 0
Total Earmarked 5,153 (4,581) 572
Unallocated General Fund 357 (357) 0
General Fund 5,510 (4,938) 572
Earmarked Funds

Page 53

PUBLIC INFORMATION
Financial Recovery Action Plan          Appendix E 
FINANCIAL RECOVERY PLAN £m £m £m
Projected Overspend at Month 7 6.190
SERVICE AREA
Cost
reduction
target
Achieved in
projected
outturn
Still to be
achieved Target set?
Health and Community Care
Reduce care home placements in line with
budget saving (0.700) 0.000 (0.700) June IJB
Reduce CAH capacity/delay recruitment/in-
house efficiencies (0.850) (0.655) (0.195) June IJB
Community Wards - reduce supplementary
staffing and review bed capacity (0.500) (0.361) (0.139) June IJB
MH and LD (North Ayrshire)
Freeze adult community support approvals
outwith transitions 0.000 0.000 0.000 June IJB
Respite provision - ensure use of in-house
capacity is maximised 0.000 0.000 0.000 June IJB
HBCCC mitigation plan (0.075) (0.075) 0.000 August IJB
MH and LD (Lead Partnership)
Ward staffing (adults/elderly inpatients) (0.300) (0.083) (0.217) August IJB
Psychiatry (use of agency) (0.312) (0.312) 0.000 August IJB
CEDS/CAMHS (0.202) (0.202) 0.000 August IJB
North Ayrshire share (38.6%) (0.314) (0.230) (0.084)
Children and Families
Reduce children's external placements - early
reduction from Brighter Pathways work (0.500) (0.500) 0.000 June IJB
Additional target re-residential placements (0.500) (0.139) (0.361) August IJB
Additional target re-residential placements (0.225) 0.000 (0.225) September IJB
Reduce investment in C&F social work via
service redesign fund (0.300) 0.000 (0.300) September IJB
Cross Partnership
Vacancy management and temporary posts (0.500) (0.500) 0.000 June IJB
Use of remaining reserve balance (0.357) 0.000 (0.357) August IJB
Review of earmarked reserves (0.216) 0.000 (0.216) September IJB
Target Achieved Outstanding
(5.037) (2.460) (2.577)
Remaining projected overspend 3.613

Page 54

PUBLIC INFORMATION
Bank and Agency Costs to Month 7      Appendix F 
1) NHS
4863
(Registered)
4864
(Unregistered)
4853
(Registered)
4854
(Unregistered)
4865 (Agency
Locum
Consultant)
4867 (Agency
Locum Spec
Registrar) TOTAL
NORTH CORE SLT ADULT 8,393                      8,393                    
WARD 1 WOODLANDS VIEW 40,990              254,220                  295,209                
WARD 2 WOODLANDS VIEW 30,232              193,974                  224,206                
ACH REDBURN REHAB WARD NRS 7,073                67,488                    74,561                  
ACH DOUGLAS GRANT REHAB WD NRS 8,659                39,873                    530                    709                     49,771                  
WARD 3 WOODLANDS VIEW NURSING 27,404              209,737                  1,589                 185                     238,916                
WARD 4 WOODLANDS VIEW NURSING 31,764              176,007                  207,771                
NEW CLONBEITH NURSING(JURA) 79,693              65,452                    145,144                
WVIEW THE GLEN ECT -                    1,989                      1,989                    
WVIEW WARD 10 ACUTE MH NRS 35,517              43,731                    79,249                  
WVIEW WARD 8 ACUTE MH NRS 23,146              466,912                  251                     490,308                
WARD 5 WOODLANDS VIEW 19,514              19,267                    38,781                  
WVIEW WARD 7B REHAB MH NRS 2,103                2,103                    
NEW DUNURE NURSING(CLONBEITH) 30,452              97,807                    128,259                
MH BED MANAGEMENT 972                   972                       
TRINDLEMOSS 46,015              109,409                  155,425                
ARRAN HOSPITAL NURSING 18,485              22,467                    13,091               54,044                  
CAMHS MANAGEMENT 1,943                1,943                    
CAMHS UNSCHEDULED CARE 4,681                4,681                    
EARLY YRS-C/F TEAM 2 290                   290                       
IMMUNISATION NURSING 30,026              18,899                    48,925                  
ARRAN HV 506                   506                       
PACKAGE OF CARE (P) - CY -                    17,794                    17,794                  
PACKAGE OF CARE (P) - AMG -                    44,441                    44,441                  
PACKAGE OF CARE (P) - LMO 5,154                      5,154                    
ARRAN DN 235                   235                       
NC POC TEAM 2 529                         529                       
NC POC TEAM 3 -                    2,548                      2,548                    
THREE TOWNS DN 9,906                161                    10,068                  
IRVINE DN 15,398              15,398                  
NORTH WEST COAST DN 4,037                99                           4,136                    
GARNOCK VALLEY DN 67,120              67,120                  
NORTH DN TEAM LEADERS 4,286                4,286                    
LADY MARGARET NURSING 10,957              5,351                      16,307                  
PREVENTION + SERVICES SPT TEAM 1,481                1,481                    
MH UNPACS (PRIVATE) -                    -                        
LD HEALTH CHECKS 85,491              85,491                  
NORTH CLDT 429                         429                       
LDS MANAGEMENT 4,100                4,100                    
NORTH PARTNERSHIP ADMIN MH 13                      13                         
MHS INPATIENT MGT 18,468              18,468                  
CMHT NURSING-NORTH AYRSHIRE -                    8,439                      8,439                    
WVIEW WARD 7C FORENSIC REHAB N 5,340                78,699                    84,040                  
DAY ACTIVITIES TEAM 227                   227                       
INTENSIVE COMMUNITY NURSING TEAM 21,003              21,003                  
ADULT MENTAL HEALTH LIASION TEAM 2,295                2,295                    
PCMHT NORTH 1,663                1,663                    
WVIEW WARD 6 LOW SECURE NRS 46,566              139,849                  186,415                
WARRIX AVE 13,994              23,125                    37,119                  
ACTION 15 - ADULT LIAISON 8,815                8,815                    
NORTH CORE SLT PAEDS 1,483                      1,483                    
FORENSIC PSYCHOLOGY 2,062                2,062                    
ICFN - COMMUNITY PHLEBOTOMY -                    7,173                      7,173                    
WVIEW WARD 7A LD A+T NRS 12,979              459,760                  2,966                 6,616                  482,321                
WVIEW WARD 9 ACUTE MH NRS 27,435              120,263                  147,698                
WVIEW WARD 11 ACUTE MH NRS 50,361              168,568                  257                     219,186                
ADULT EAST 61,819                61,819                  
ADULT SOUTH 101,661              91,984                193,645                
853,687            2,870,934               18,351               8,018                  163,480              91,984                4,014,847     
2) SOCIAL CARE Month 7
Agency Cost
Montrose House 535,821           
Children Acm - Irvine 1,188               
Mh Acm 88,695             
Ld Acm 20,550             
TOTAL 646,253           
Bank Agency