Agenda Document Pack - Cabinet - 03/12/2024

North Ayrshire Council · 3 December 2024
Back to Cabinet — 3 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Cabinet 
A Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
03 December 2024 at 14:30 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 29
October 2024 will be confirmed and the Minutes signed in accordance
with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973 (copy enclosed).  
EDUCATION ITEMS FOR DECISION  
Reports by the Executive Director (Education) 
3 Chief Education Officer's Update
Submit a report by the Executive Director (Education) to provide a
summary of current key educational issues, both in national and local
contexts; and to inform of current and future improvement activities within
the Education Service (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
4 Annual Report - School and Early Learning and Childcare Inspections
2023-24
Submit a report by the Executive Director (Education) to inform of the
performance of North Ayrshire schools and early learning and childcare
settings in external inspections, with a focus on those published during
session 2023-24 (copy enclosed).  
GENERAL BUSINESS FOR DECISION  
Reports by the Chief Executive 
5 Proxy Voting for Councillors
Submit a report by the Head of Democratic Services to advise of a
consultation on a proposal to allow proxy voting for councillors and seek
views and agreement on a proposed response (copy enclosed). 
6 Procurement Annual Activity Report 2023-24
Submit a report by the Head of Finance to provide an update on
procurement activity for the period 2023/24 (copy enclosed).  
Reports by the Director (Health and Social Care Partnership) 
7 Brighter Pathways Re-modelling Care Options
Submit a report by the Director of Health and Social Care Partnership to
provide an update on the work of the Brighter Pathways transformation
work which was to address (i) current pressures on placement availability
and accommodation for leavers; (ii) to shift the balance of care from high-
cost external residential resources to family-based care or internal
residential resources; and (iii) to build capacity and provide more local
resources and choice to young people who require to be looked after with
increased family-based care (copy enclosed). 
8 Integration Joint Board Financial Position
Submit a report by the Director (Health and Social Care Partnership) to
provide an update on the financial position of the Integration Joint Board
(copy enclosed). 
Reports by the Executive Director (Communities and Housing) 
9 Strategic Housing Investment Plan 2025 - 2030
Submit a report by the Executive Director (Communities and Housing)
seeking approval of the Strategic Housing Investment Plan 2025 - 2030
(copy enclosed).
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
10  Consultation Response: Developing a Universal Definition of “Care
Experience”
Submit a report by the Executive Director (Communities and Housing)
seeking approval for the proposed response to the Scottish Government
consultation on developing a universal definition of “care experience”
(copy enclosed).  
Reports by the Executive Director (Place) 
11  Roads Winter Service and Weather Emergencies Plan 2025/26
Submit a report by the Executive Director (Place) to seek approval for the
Roads Winter Service and Weather Emergencies Plan 2025/26 (copy
enclosed). 
12  Highlands and Islands Regional Economic Strategy
Submit a report by the Executive Director (Place) to seek endorsement
for the Highlands and Islands Regional Economic Strategy (copy
enclosed). 
13  Lochshore Disability Employment Hub Proposal
Submit a report by the Executive Director (Place) to seek approval for the
creation of a Disability Employment Hub at Lochshore Park, within the
Garnock Valley, offering a wide range of opportunities for people with
disabilities and long-term health conditions to develop skills for
employment (copy enclosed). 
14  Urgent Items
Any other items which the Chair considers to be urgent.  
Exclusion of the Public - Para 9
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
9 of Part 1 of Schedule 7A  of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
15  Disposal of 27 Vernon Street, Saltcoats
Submit a report by the Executive Director (Place) to seek approval to
dispose of 27 Vernon Street, Saltcoats to The Ayrshire Community Trust,
in accordance with The Disposal of Land by Local Authorities (Scotland)
Regulations 2010.
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting  
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.    
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.    
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.    
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk 
4

Page 5

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Cabinet Sederunt 
Elected Members 
Marie Burns (Chair)
Shaun Macaulay (Vice-Chair)
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen 
Church Representatives 
Mr Andrew Bruce
Ms Elizabeth Turbet
Vacancy
Teaching Representative 
Ms Jacqui MacKenzie 
Youth Council Representatives 
Chair: 
Apologies: 
Attending: 
5

Page 6

6

Page 7

Cabinet
29 October 2024 
IRVINE, 29 October 2024 - At a Meeting of the Cabinet of North Ayrshire Council at
2.30 p.m. 
Present (Physical Participation)
Shaun Macaulay, Tony Gurney, Alan Hill, Margaret Johnson and Christina Larsen.
In Attendance
C. Hatton, Chief Executive; D. Hammond, Executive Director; R. Leith, Head of
Service; and A. Morrell, Senior Manager (Community Development) (Communities)
(Communities and Housing); C. Cameron, Director (Health and Social Care
Partnership); S. Anson, Executive Director (Education); Russell McCutcheon,
Executive Director (Place); M. Boyd, Head of Service; D. Forbes, Senior Manager
(Strategic Business Partner); and A. Dunsmore, Team Manager (Business Partner)
(Finance); F. Walker, Head of Service (People & ICT); A. Craig, Head of Service; 
L. Jolly, Communications Officer; and S. Wilson, Committee Services Officer
(Democratic Services) (Corporate Services). 
Also Present
Eleanor Collier, Davina McTiernan and Donald L Reid. 
Chair
Shaun Macaulay in the Chair. 
Apologies
Marie Burns.
1. Declarations of Interest 
In terms of Standing Order 11 and Section 5 of the Code of Conduct for Councillors,
Councillor Hill declared an interest in agenda item 8 – Proposals for Community
Investment Fund (CIF) Expenditure and agreed to leave the meeting during
consideration of this item of business, taking no part in its determination. 
2. Minutes 
The Minutes of the Meeting of the Cabinet held on 1 October 2024 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the
Local Government (Scotland) Act 1973. 
3. Treasury Management and Investment Mid-Year Report 2024/25 
Submitted a report by the Head of Finance providing a Treasury Management update
for the period 1 April to 30 September 2024. The Treasury Management and
Investment Mid-Year Report 2024/25 was attached at Appendix 1 to the report. 
Officers responded to Members’ questions and the Cabinet agreed (a) to endorse the
Treasury Management and Investment Mid-Year Report 2024/25 attached at
Appendix 1 to the report; and (b) note the Prudential and Treasury Indicators
contained therein. 
Agenda Item 2
7

Page 8

4. Revenue Budget 2024/25: Financial Performance to 31 August 2024 
Submitted a report by the Head of Finance advising of the financial performance for
the Council at 31 August 2024. 
Officers responded to Members’ questions and the Cabinet agreed to note (i) the
information and financial projections outlined in the report and (ii) the latest financial
projection for the Health and Social Care Partnership highlighted at section 2.5 of the
report. 
5. Capital Programme Performance to 31 August 2024 
Submitted a report by the Head of Finance advising of progress in delivering the
Capital Investment Programme 2024/25. 
Officers responded to Members’ questions and the Cabinet agreed (a) to approve the
virement proposal noted within the HRA programme detailed in Appendix 2 to the
report; (b) note (i) the revisions to budgets outlined in the report; and (ii) the General
Services and HRA revised budgets at 31 August 2024 and the forecast expenditure to
31 March 2025. 
6. Cost of Living Support Update 
Submitted a report by the Executive Director (Communities and Housing) providing a
further progress report on the response to the cost of living crisis. The Cost of Living
Themes and Updates were attached at Appendix 1 to the report. 
Officers responded to Members’ questions and the Cabinet (a) noted the progress the
Council has made in the development and delivery of support in relation to the cost-of-
living crisis and towards the Council Plan priority of a wellbeing economy; and (b) agreed
to the provision of future updates through the Council’s performance management system
and the annual Community Planning Partnership performance report. 
7. North Ayrshire Council Community Learning and Development Plan 2024 -
2027 
Submitted a report by the Executive Director (Communities and Housing) seeking
approval of the North Ayrshire Council Strategic Community Learning and Development
Plan 2024-2027 attached at Appendix 1 to the report. 
Officers responded to Members’ questions and the Cabinet agreed to (a) approve 
the North Ayrshire Council Strategic Community Learning and Development Plan 2024-
2027 attached at Appendix 1 to the report; and (b) authorised officers to take forward the
year one Outcome Plan with a view to targeting resources to address the identified unmet
needs. 
Councillor Hill left the meeting at this point. 
8

Page 9

8. Proposals for Community Investment Fund (CIF) Expenditure 
Submitted a report by the Executive Director (Communities and Housing) to
determine applications by Locality Partnerships for allocation of CIF funding to
proposed projects. Applications from Largs Development Trust and Ardrossan Winton
Rovers Community Interest Company were attached at Appendices 1 and 2,
respectively, to the report. 
Having reviewed the applications in line with the CIF criteria, the Cabinet agreed to
approve to approve the applications attached as Appendices 1 and 2, respectively, to
the report. 
Councillor Hill rejoined the meeting at this point. 
9. Urgent Items 
There were no urgent items. 
The meeting ended at 3:15 p.m 
The full meeting proceedings can be viewed at 
https://north-ayrshire.public-i.tv/core/portal/home 
9

Page 10

10

Page 11

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet 
Title:    Chief Education Officer’s Update Report 
Purpose:  To provide Cabinet with a summary of current key educational
issues, both in national and local contexts; and to inform Cabinet
of current and future improvement activities within the Education
Service. 
Recommendation:  It is recommended that Cabinet: 
(a) Notes the contents of this report; and
(b) Agrees to receive a further update report from the Chief Education
Officer within six months. 
1. Executive Summary 
1.1 North Ayrshire’s Education Service is focused on improving attainment and closing the
poverty-related attainment gap. This includes the introduction of a new approach to
attainment dialogue meetings with secondary school leaders. Monitoring tools and
professional learning opportunities are being implemented to track learner progress and
improve educational outcomes across all sectors. 
1.2 The service is addressing increasing demand for additional support needs (ASN)
provision, including reviewing current arrangements and collaborating with health and
social care services to maximise support. Key developments include enhancing child
protection procedures, updating policies on funded school transport, and improving
engagement with parents of learners with support needs. 
1.3 New vacancy and staff absence management procedures are in place across the
service to ensure efficient resource management. A systematic four-year review of
policies is underway, with priorities set by school leaders. 
1.4 The national thematic inspection of North Ayrshire Education Service resulted in very
positive feedback. North Ayrshire is engaging in collaborative improvement activities in
a quad with three other local authorities facing similar socio-economic challenges.
Future partnership work is also planned with East and South Ayrshire and Ayrshire
College to explore expanded qualification options in senior phase education. 
2. Background 
2.1  The work of the Education Service leadership team is organised into three thematic
areas: Raising Attainment and Achievement; Supporting Needs; and Strategic Service
Agenda Item 3
11

Page 12

Support. This update report will provide key information on each of these thematic
areas as well as other current local and national educational issues. 
2.2 Raising Attainment and Achievement 
2.2.1 Achievement of Curriculum for Excellence levels data will be published nationally in
December. Whilst there have been modest improvements in attainment levels in North
Ayrshire again this year, the service will continue to have an increased focus on raising
attainment and reducing the poverty-related attainment gap, as intimated to Cabinet
in August in the Service Improvement Plan. A report summarising our Curriculum for
Excellence achievement levels will be brought to Cabinet later in the academic year. 
2.2.2 A series of attainment dialogue meetings have been held with all secondary school
leadership teams to discuss performance in the latest diet of national qualifications.
Discussions focused on the celebration of success as well as the identification of future
focused areas for improvement. This work will feed into the school improvement
planning cycle. This will be followed up with all schools in March and a full report
analysing the attainment outcomes of our school leavers will be brought to Cabinet
later in the academic year. 
2.2.3 A new tracking and monitoring tool has been created within the service to support
establishments with the analysis of learner progress. Establishments have been
supported to set achievement targets for the year. These will be monitored through the
quality improvement cycle. A Service Improvement Group has been set which will
focus on further specific actions to support improved attainment and achievement
across the service. 
2.2.4 A new Digital Learning Strategy is currently in development. This will provide a
framework for learners and staff to ensure that learning is enhanced through the
effective use of digital technologies. The strategy will focus on the development of
digital skills. The service has been involved in a national research project on the
emergent issues around Artificial Intelligence in education. The service continues to
work with IT Services to ensure that the Digital Learning Strategy aligns well with the
updated North Ayrshire Council Digital Strategy.  The service has begun to explore
potential additional funding sources for devices across all sectors to support digital
technology usage and the development of digital skills. 
2.2.5 Senior leaders have been engaging in activity around curriculum design and
innovation with a view to ensuring that the curriculum offer across our early years
establishments, primary and secondary schools supports learner engagement, high
quality learning, teaching and assessment, and help to raise attainment.  Linked with
this, the service has developed an Ayrshire Growth Deal tool which supports schools
to plan tailored skills development through the curriculum.  This has been shared
across all sectors and has been presented to partners at the Ayrshire Skills Group and
with Ayrshire Growth Deal programme managers. 
2.2.6 There has been a series of activities to support highly effective teaching and learning
experiences for all learners. The Professional Learning Academy is operating an
updated delivery model which incorporates the aim of sustainable professional
learning and effective use of data for improvement.  In addition, senior leaders have
engaged with a series of moderation inputs to continue to develop the understanding
of the moderation cycle and achievement of a level.  In the secondary sector, DHTs
and PTs of English and Maths have been provided with opportunities for professional
12

Page 13

dialogue around the core Quality Indicators and data literacy which both support
raising attainment.   
2.2.7 Following the conclusion of the early learning and childcare review, the service has
developed a significant programme of service-wide professional learning for early
years staff to ensure that quality improvement in our early years provisions remains a
key focus. In addition, work to embed play pedagogy in the early stages of primary is
ongoing, following the ADES collaborative improvement visit last year, and which was
presented to Cabinet earlier this year. 
2.3 Supporting Needs 
2.3.1 We continue to implement the recommendations from the Morgan Review and findings
of ASL inquiry (May 2024). The service is currently undertaking review and scoping
work around targeted and specialist additional support needs provision across the
service. This is in response to the significant change in the profile of needs in our
establishments and the challenges this presents in terms of supporting needs as
effectively as possible within our current arrangements. Options will be discussed with
relevant stakeholder groups and proposals will be brought to Cabinet for decision in
due course. 
2.3.2 In collaboration with colleagues in the HSCP, the Brighter Pathways group is focused
on supporting children and young people who are on the edge of care placements. We
are also engaged in positive partnership around the North Ayrshire Multiagency
Neurodevelopmental Support Pathways work and an Education Senior Manager is
jointly chairing the panel with a colleague from Health and Social Care. 
2.3.3 Child Protection procedures have been reviewed and significantly updated to ensure
more streamlined processes are in place for all establishments. The updated policy
has been launched with all staff and has been received positively. New monthly
monitoring within the service allows for patterns and trends to be easily spotted and
professional learning targeted at particular establishments, clusters or localities. We
have also introduced a monthly check-in with Service Access colleagues in the HSCP,
where concerns can be shared, discussed and resolved. 
2.3.4 Given concerns around the escalating costs of funded school transport, the application
of the Policy has been reviewed, alongside the approach to appeals. The internal
guidance has been updated and the initial application revised to ensure a more
consistently rigorous approach to the consideration of applications relating to
additional support needs. 
2.3.5 Following the Behaviour In Scottish Schools Research (2023) and the publication of
the subsequent Scottish Government Action Plan (November 2024), work has been
undertaken to review the Corporate Violence and Aggression Policy as it applies within
educational settings. This was undertaken collaboratively with colleagues from
Corporate Health and Safety as well as trade unions and includes specific instruction
around prevention, reporting and support for employees. The policy on Promoting
Positive Relationships is being updated to ensure specific guidance is given around
behaviour and consequences including the creation of Positive Behaviour Plans which
include assessment of risk. 
2.3.6 Our approach to engaging with parents and carers around additional support needs
has been significantly enhanced with pro-active engagement with two support groups
(ASN Ayrshire and ASN 3-towns). This work was recognised in the Scottish parliament
13

Page 14

as being positively welcomed by parent support groups. Following this early
collaboration, we reviewed our policy for supporting specific diets for neurodiverse
learners and now have a new approach which has been welcomed by parents and
carers.  We continue to work collaboratively to design a partnership forum to
encourage open communication with parents and families of children with additional
needs. Updated literature has also been created to ensure parents and carers are well
informed about issues to do with starting school when your child has additional needs;
this incudes the placement process. 
2.3.7 Ensuring children and young people’s rights are respected and upheld is a crucial
element of our work to support needs and we are piloting both Young Leaders of
Learning and Young Inclusion Ambassadors within establishments across North
Ayrshire. This also links with recognising and celebrating our achievements in
championing inclusion through the Success Looks Different national awards: we are
supporting establishments through this process. 
2.4 Strategic Service Support 
2.4.1 Three new education provisions have opened so far this academic year: Marress
House Early Years Centre; Montgomerie Park Primary School and Early Years Class;
and Moorpark Primary School and Early Years Class. All provisions are working well
and represent excellent additions to our learning estate, providing very high-quality
learning environments and excellent facilities for our children and young people. Plans
for official openings are in progress and will be shared in the near future. 
2.4.2 New vacancy management procedures have been implemented to ensure that all
posts governed by the Devolved School Management Scheme are scrutinised prior to
vacancies being filled. This takes place on a weekly basis and is managed directly by
the Head of Service. Adopting this process replicates the level of scrutiny applied to
local government posts in other services and is designed to ensure effective resource
management and that posts are only filled if a set of well-defined criteria are met. 
2.4.3 New staff absence management procedures are in development. The service is
working with the new HR Adviser on the creation of more efficient monitoring and
assurance processes. This is part of a larger project which aims to: improve the quality
of sickness absence data; analyse trends and underlying drivers of sickness absence;
support more systematic implementation of absence management policies through
improved monitoring and reporting structures; and address underlying drivers of
sickness absence where possible and maximise support available for staff. 
2.4.4 The service has worked in collaboration with trade union colleagues through the Local
Negotiating Committee for Teachers (LNCT) to review and develop comprehensive
new guidance to support the creation of annual Working Time Agreements for teaching
staff in all establishments. This guidance will ensure that school leadership teams work
effectively in partnership with professional associations to ensure agreement is
reached at school level when planning certain key activities for teachers across the
school calendar. 
2.4.5 The service is in year two of a four-year systematic review and update of service-level
policies and operating procedures to ensure that establishments are supported to
respond consistently in agreed policy areas. Part of the review process includes a
policy review group of Heads of Establishment. Policy areas for review, refresh or
development in the current academic year were agreed and prioritised by Heads of
Establishment, and include the following thematic areas: Use of mobile phones;
14

Page 15

Responsible use of social media; Inventory procedures; Education and the law;
Information sharing; Emergency school closures; Recruitment to teaching/promoted
posts; Staff new start/leaver procedures; Managing grievance; Exclusion; Transitions;
Curriculum review cycle; Early learning; Supporting care experienced learners;
Working collaboratively with privately arranged therapists, tutors or practitioners;
Physical restraint and seclusion; Supporting staff wellbeing. 
2.5 Local and National Issues 
2.5.1 HMIe has recently appointed Jacqui Nimmo, Head of Inspection, as a link between
North Ayrshire Council and the inspectorate. To date two meetings have taken place
with the Chief Education Officer and have focused on working in partnership to support
successful inspection outcomes for our establishments. It has been recognised that
North Ayrshire has a strong inspection record, further details of which are outlined in
the annual report to Cabinet. 
2.5.2 A National Thematic Inspection was carried out by His Majesty’s Inspectorate of
Education (HMIe) in all 32 education authorities across Scotland during September
and October. The inspections focused on how local authorities support improvement
across all educational establishments. Inspectors visited North Ayrshire Council in the
week beginning 16 September 2024 and met with focus groups of key education staff,
including the service leadership team, school leaders, teachers, representatives from
the parent forum, trade unions and elected members. The verbal feedback from this
inspection was very positive, with a number of areas of effective practice highlighted.
A written report is due in December 2024. This is expected to be followed by the
development of a new inspection framework to evaluate the quality of the work of
education authorities, which was originally announced by the Chief Inspector
alongside the National Thematic Inspection in June 2024. Officers in North Ayrshire
would welcome the opportunity for involvement in the development of the new
inspection framework. 
2.5.3 Through the Association of Directors of Education (ADES), North Ayrshire has been
grouped together with the Education Services of Glasgow City, Dundee City and North
Lanarkshire to work on collaborative improvement activity. These partner local
authorities have similarly high levels of deprivation and have committed to work on
agreed shared improvement goals. This partnership work will begin in January 2025,
with further updates being provided to Cabinet in due course. A principal focus in the
initial months will be on using the new self-evaluation tool recently developed by ADES
in partnership with HMIe, entitled “How Good is Our Education Authority?” as a focus
for collaborative support and challenge. This framework is organised under two key
quality indicators: Leadership, direction and continuous improvement; and Improving
outcomes for all. 
2.5.3 The publication of the annual staff and pupil census is expected in December 2024. It
is anticipated that the pupil:teacher ratio will be around 12.4. North Ayrshire Council
will continue to work with Scottish Government and engage in discussions whenever
possible around service needs in light of our declining school roll. 
2.5.4 The Scottish Government’s Educational Reform Programme focuses on evolving the
Curriculum for Excellence (CfE) to address key challenges identified by the OECD.
Current actions include piloting curriculum reviews (2023–2024) to test methodologies
for the Curriculum Improvement Cycle (CIC), aiming to declutter the curriculum, clarify
knowledge, and enhance transitions between Broad General Education (BGE) and the
15

Page 16

Senior Phase. Stakeholder engagement is underway and North Ayrshire Education
Service will be contributing to this work. 
2.5.5 North Ayrshire Council Education Service has begun to discuss opportunities for closer
partnership working with the education services in East and South Ayrshire. A key
consideration in the next period will be a partnership approach, including Ayrshire
College, to the provision of a full breadth of qualifications options in the senior phase. 
3. Proposals 
3.1 It is recommended Cabinet: 
(a) Notes the contents of this report; and
(b)  Agrees to receive a further update report from the Chief Education Officer within
six months. 
4. Implications/Socio-economic Duty 
Financial 
4.1 No direct implications as a result of this report. 
Human Resources 
4.2 No direct implications as a result of this report. 
Legal 
4.3 No direct implications as a result of this report. 
Equality/Socio-economic 
4.4 No direct implications as a result of this report. 
Climate Change and Carbon 
4.5 No direct implications as a result of this report. 
Key Priorities 
4.6 Council priorities: 
The external inspection activity confirms the focus of the Education Service is to align with
the Council Plan 2023-28 strategic aim to “transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people” and more specifically “improving
educational attainment and achievement and closing the attainment gap” activities.   
Community Wealth Building 
4.7  Better educational outcomes for children young people and adults, as well as
increased capacity building and resilience in communities are required to underpin a
strong local economy. North Ayrshire works in partnership with local early learning and
16

Page 17

childcare providers (local businesses) to ensure the provision of care is a shared
endeavour. 
5. Consultation 
5.1 There has been no specific consultation on the contents of this report. 
Sam Anson
Executive Director 
For further information please contact Andrew McClelland, Head of Service (Education)
and Chief Education Officer, on 01294 324413. 
Background Papers
0
17

Page 18

18

Page 19

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet 
Title:    Annual Report – School and Early Learning and Childcare
Inspections 2023-24 
Purpose:  To inform Cabinet of the performance of North Ayrshire schools
and early learning and childcare settings in external inspections,
with a focus on those published during session 2023-24. 
Recommendation:  It is recommended that Cabinet: 
(a) Notes the contents of this report; and
(b) Commends the performance of schools and ELC settings in
inspections conducted by Education Scotland and the Care
Inspectorate. 
1. Executive Summary 
1.1 Education Scotland published inspection reports on seven educational establishments
in North Ayrshire in session 2023-24. Although one school received evaluations of less
than satisfactory, the overall performance of our schools and centres continues to be
very positive. 
1.2 The Care Inspectorate published inspection reports on eight local authority early
learning and childcare establishments in North Ayrshire in session 2023-24. The
performance of all these establishments was positive. 
1.3 Action has been taken by individual schools and early years establishments, supported
by the education service, to celebrate strengths and to address areas for improvement
identified in the inspection reports. Specifically, in relation to the school which will be
subject to a further inspection later this year, a full action plan has been developed and
is now being implemented. 
2. Background 
2.1 Schools are subject to periodic external evaluation by the national inspection agency,
Education Scotland.  Early Learning and Childcare settings are inspected by both
Education Scotland and the Care Inspectorate. 
2.2 Education Scotland reports on the quality of school and early years provision under the
following quality indicators, taken from the self-evaluation framework How good is our
school? (4th edition): 
Agenda Item 4
19

Page 20

• Leadership of change
• Learning, teaching and assessment
• Ensuring wellbeing, equality, and inclusion
• Raising attainment and achievement (primary, secondary, ASN schools)
• Securing children’s progress (Early learning & childcare settings). 
2.3 In 2022, the Care Inspectorate introduced a new quality framework for daycare of
children, childminding and school-aged childcare. This quality framework is structured
around the following key questions: 
• How good is our care, play and learning?
• How good is our setting?
• How good is our leadership?
• How good is our staff team? 
2.4  All inspections focus on at least two quality indicators.  In session 2023-24, Education
Scotland carried out seven school inspections in North Ayrshire (three of which included
an inspection of their early years class) as part of a national sample size of 250 schools. 
2.5 Education Scotland uses a six-point scale to report on the performance of the
educational establishment in each of the assessed quality indicators.  The categories of
the six-point scale are: excellent, very good, good, satisfactory, weak, and
unsatisfactory.  Further detail on the meaning of the six-point scale is included at
Appendix 2. 
2.6 In session 2023-24, the Education Scotland inspection outcomes in North Ayrshire
schools were as follows: 
School Inspection
Report
Date
1.3 Leadership
of change
2.3 Learning,
teaching and
assessment
3.1 Ensuring
wellbeing,
equality and
inclusion
3.2 Raising
attainment and
achievement
Dykesmains
Primary School 12/12/2023 [Not assessed] Very Good [Not assessed] Very Good
St Mark’s
Primary School 06/02/2024 [Not assessed] Satisfactory [Not assessed] Satisfactory
Winton
Primary School 27/02/2024 [Not assessed] Good [Not assessed] Good
Cumbrae
Primary School 23/04/2024 Very Good Very Good Very Good Very Good
Gateside
Primary School 28/05/2024 Very Good Very Good Very Good Very Good
Kilmory
Primary School 27/08/2024 [Not assessed] Satisfactory [Not assessed] Satisfactory
Pirnmill
Primary School 27/08/2024 [Not assessed] Weak [Not assessed] Weak 
2.7 In session 2023-24, the Education Scotland inspection outcomes in early years classes
within North Ayrshire schools were as follows: 
School Inspection
Report
Date
1.3 Leadership
of change
2.3 Learning,
teaching and
assessment
3.1 Ensuring
wellbeing,
equality and
inclusion
3.2 Securing
children’s
progress
Cumbrae
Primary Early
Years
23/04/2024 Good Good Good Good
20

Page 21

Gateside
Primary Early
Years
28/05/2024 Very Good Very Good Very Good Very Good
Kilmory
Primary Early
Years
27/08/2024 [Not assessed] Good [Not assessed] Good 
2.8 In session 2023-24, the Education Scotland inspection outcomes in partner early years
settings within North Ayrshire were as follows: 
Partner Early
Years Setting
Inspection
Report
Date
1.3 Leadership
of change
2.3 Learning,
teaching and
assessment
3.1 Ensuring
wellbeing,
equality and
inclusion
3.2 Securing
children’s
progress
Douglas Park
Nursery 06/02/2024 [Not assessed] Very Good [Not assessed] Very Good
West Kilbride
Early Years
Centre
06/02/2024 [Not assessed] Very Good [Not assessed] Very Good 
2.9 Since the introduction of the current inspection framework “How Good is our School?
(4th edition)” in session 2016-2017, there has been a total of 32 inspections by Education
Scotland across North Ayrshire’s schools and early years classes. Over that time frame,
the performance of North Ayrshire schools in Education Scotland inspections has been
extremely positive.  By way of comparison in the table below, each grade has been
assigned a numerical value to show our average performance against the regional and
national performance.  The higher the value, the better the performance. NAC
outperforms regional and national comparators across all quality indicators.   
Average grade assigned through Education Scotland inspection 2016-2024
(schools only):
Quality Indicator NAC 
2016-24*
Regional
2016-24
(SWEIC)*
National
2016-24*
Leadership of change 4.54 3.83 3.77
Learning, teaching and assessment 4.13 3.78 3.72
Ensuring wellbeing, equality and inclusion 4.54 4.01 3.94
Raising attainment and achievement 4.10 3.73 3.69
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
Average grade assigned through Education Scotland inspection 2016-2024 (early
learning and childcare settings only (authority provision)):
Quality Indicator NAC
2016-24*
Regional
2016-24
(SWEIC)*
National
2016-24*
Leadership of change 4.20 3.83 3.66
Learning, teaching and assessment 4.41 3.95 3.73
Ensuring wellbeing, equality and inclusion 4.30 4.13 3.98
Securing children’s progress 4.41 4.01 3.82
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
2.10 A further indicator of quality of educational provision overall is the percentage of school/
early learning and childcare inspections by Education Scotland which resulted in an
evaluation of “good” or better.  Data has been analysed since the introduction of the
current inspection framework in 2016-17 to the end of session 2023-24. Again, this
21

Page 22

demonstrates an extremely strong performance in North Ayrshire which significantly
outperforms regional and national comparators across all indicators: 
Percentage of Education Scotland inspections resulting in an evaluation of
“good” or better 2016-24 (schools only):
Quality Indicator NAC 
2016-24*
Regional
2016-24
(SWEIC)*
National
2016-24*
Leadership of change 85% 63% 62%
Learning, teaching and assessment 81% 68% 63%
Ensuring wellbeing, equality and inclusion 85% 69% 69%
Raising attainment and achievement 77% 68% 62% 
Percentage of Education Scotland inspections resulting in an evaluation of
“good” or better 2016-24 (early learning and childcare settings only): 
Quality Indicator NAC
2016-24*
Regional
2016-24
(SWEIC)*
National
2016-24*
Leadership of change 80% 67% 60%
Learning, teaching and assessment 88% 72% 63%
Ensuring wellbeing, equality and inclusion 80% 74% 75%
Securing children’s progress 88% 75% 68% 
2.11 The Education Scotland inspection reports (at Appendix 1) highlight a number of key
strengths common to several of the establishments they visited in North Ayrshire in
2023-24.  Notable strengths have been identified in the following areas: 
• Effective leadership: Strong leadership from the Head Teacher and senior leaders in
raising attainment, tracking progress, and ensuring positive outcomes for learners.
• Collaborative staff work: Teachers and support staff work together to improve
learning, teaching and assessment practices.
• Positive relationships and support: Strong, supportive relationships between staff
and learners within a nurturing, calm and purposeful learning environment.
• Learner attainment in key areas: High attainment, particularly in numeracy and
listening and talking.
• Opportunities for skill development: A wide range of opportunities provided for
learners to develop skills and achieve beyond the classroom. 
2.12 Areas for improvement in North Ayrshire were identified through the inspection reports.
All reports always have at least one identified area for improvement. The improvement
actions frequently include the wording “continue to” or “further develop”, demonstrating
that establishments are already beginning to take steps to address these points. The
most common themes for improvement in 2023-24 were: 
• Develop more independence in learning: Support children in leading their own
learning through more opportunities for learning conversations, goal setting and self-
reflection.
• Improve assessment and tracking processes: Enhance the use of data and
assessments to better track learner progress, identify learning needs and plan
appropriately challenging activities.
22

Page 23

• Continue to raise attainment in core subjects: Focus on further improving
achievement, particularly in literacy and numeracy, and ensure that learning activities
are appropriately challenging and tailored to the needs of all learners. 
2.13 The key areas for improvement are also being addressed more widely across all
establishments through the priority actions of the Service Improvement Plan. 
2.14 For Pirnmill Primary School, where the quality indicators of: i) learning, teaching and
assessment and ii) raising attainment and achievement were both evaluated as weak,
a specific, detailed action plan has been formulated. The implementation of this action
plan is already underway and is being led by the new Head Teacher, with support from
the central team. A further inspection will be undertaken by Education Scotland within
the next year, the outcome of which will be reported to Cabinet. 
2.15 In session 2023-24 the performance of North Ayrshire Early Learning and Childcare
centres and classes in Care Inspectorate inspections was positive. Care Inspectorate
reports can all be accessed via the website.  A total of eight Local Authority Early Years
centres and classes and four partner nurseries were inspected, the evaluations for
which are summarised in the tables below: 
Early Learning
and Childcare
Setting (NAC)
Inspection
Report
Date
KQ1: How good
is our care, play
and learning?
KQ2: How good
is our setting?
KQ3: How good
is our
leadership?
KQ4: How good
is our staff
team?
Fairlie Primary
School Nursery
Class
11/10/2023 Very good Good Good Very Good
Lamlash Primary
School Nursery
Class
06/11/2023 Very Good Very Good Very Good Very Good
Brodick Primary
School Nursery
Class
04/12/2023 Very Good Very Good Very Good Very Good
Pennyburn
Primary School
Nursery Class
28/03/2024 Adequate Adequate Adequate Adequate
Annick Primary
School Nursery
Class
17/04/2024 Very Good Very Good Good Good
Hayocks
Primary School
Nursery Class
11/05/2024 Good Good Good Adequate
Gateside
Primary School
Nursery Class
29/05/2024 Very Good Very Good Very Good Very Good
Springvale Early
Years Centre 15/08/2024 Very Good Very Good Very Good Very Good 
Early Learning
and Childcare
Setting (partners)
Inspection
Report
Date
KQ1: How good
is our care, play
and learning?
KQ2: How good
is our setting?
KQ3: How good
is our
leadership?
KQ4: How good
is our staff
team?
Whitehirst Park
Private Nursery 30/08/2023 Good Adequate Good Good
Treetops Too
(Saltcoats) 24/10/2023 Good Adequate Good Good
First Steps
Nursery (Irvine) 25/03/2024 Good Very Good Good Good
Whitehirst Park
Private Nursery 05/07/2024 Good Good Good Good 
23

Page 24

2.16  The Care Inspectorate updated their framework of quality indicators in 2022.
Nevertheless, in order to mirror the approach above (for Education Scotland
inspections) to providing trend information over several years, a calculation has enabled
average performances to be shown, covering the period 2016-24, both for North
Ayrshire’s local authority early learning and childcare settings, as well as for the South
West Educational Improvement Collaborative. As with similar comparisons for schools,
this demonstrates that we are performing well when benchmarked against others. 
Average grade assigned through Care Inspectorate inspections in Early Learning
and Childcare (NAC settings):
New Quality Indicator
(from August 2022)
Previous Quality
Indicator (before
August 2022)
North Ayrshire
Average
Performance 
2016-24*
SWEIC 
Average
Performance 
2016-24*
Quality of care, play and
learning 
Quality of care and
support 4.78 4.54
Quality of setting Quality of environment 4.67 4.39
Quality of leadership  Quality of management
and leadership 4.33 4.28
Quality of staff team  Quality of staffing 4.56 4.48
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
2.17 Common strengths from the Care Inspectorate reports on early learning and childcare
settings in North Ayrshire in 2023-24 are: 
• Nurturing Care: Children experience secure, happy, and confident care, with staff
consistently providing supportive and responsive interactions that focus on emotional
wellbeing.
• Strong Teamwork and Leadership: Staff work effectively as teams, supported by
strong leadership that encourages collaboration, communication and continuous
professional development.
• Learning through Play: A strong emphasis on play-based learning, with children
leading their own activities and enjoying free-flow access to both indoor and outdoor
spaces that promote hands-on, exploratory learning.
• Positive Relationships with Families: Settings prioritise building strong, meaningful
relationships with families, ensuring that parents and carers are involved and well-
supported in the children's learning and development.
• Commitment to Continuous Improvement: Many settings show a clear focus on
self-evaluation and ongoing improvement, with staff and leadership committed to
refining practices and enhancing the quality of care and learning. 
2.18 Care Inspectorate reports included six areas for improvement in total for early learning
and childcare establishments in North Ayrshire in 2023-24.  Plans are in place in the
relevant individual establishments to address these. Heads of establishment are
working closely with the central team to ensure that improvements are made in the
identified areas, which cover: specific aspects of the learning environment and
experiences; improvement in processes for monitoring learners’ progress; and
maximising the effective deployment of staff. In parallel, the service is in the process of
designing and implementing a broad new programme of professional learning for early
learning and childcare, which will contribute to and support the systematic improvement
of quality across the service. 
24

Page 25

2.19 As part of the service’s commitment to continuous improvement, inspection outcomes
have been used alongside feedback and engagement sessions with head teachers and
other senior officers, to feed into an evaluation of the service’s Quality Improvement
Framework, which has been refreshed and updated for session 2024-25. There is an
increased flexibility in approach, agreed at individual establishment level. The Quality
Improvement Framework is designed to give establishments, the service and elected
members assurance that self-evaluation is a key aspect of the work of our
establishments and that this leads consistently to planned improvements, based on
local contexts. 
3. Proposals 
3.1 It is recommended Cabinet: 
(a) Notes the contents of this report; and
b) Commends the performance of schools and ELC settings in inspections conducted
by Education Scotland and the Care Inspectorate throughout academic session 2023-
24. 
4. Implications/Socio-economic Duty 
Financial 
4.1 No direct implications as a result of this report. 
Human Resources 
4.2 No direct implications as a result of this report. 
Legal 
4.3 No direct implications as a result of this report. 
Equality/Socio-economic 
4.4 No direct implications as a result of this report. 
Climate Change and Carbon 
4.5 No direct implications as a result of this report. 
Key Priorities 
4.6 Council priorities: 
The external inspection activity confirms the focus of the Education Service is to align with
the Council Plan 2023-28 strategic aim to “transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people” and more specifically “improving
educational attainment and achievement and closing the attainment gap” activities.   
Community Wealth Building 
4.7 Better educational outcomes for children young people and adults, as well as increased
25

Page 26

capacity building and resilience in communities are required to underpin a strong local
economy. North Ayrshire works in partnership with local early learning and childcare
providers (local businesses) to ensure the provision of care is a shared endeavour. 
5. Consultation 
5.1 There has been no specific consultation on the contents of this report, however, there
is ongoing engagement with school and early years communities at various levels on
evaluating the quality of education. This work informs and supports the improvement
planning process, both within individual establishments and across the service. 
Sam Anson
Executive Director 
For further information please contact Andrew McClelland, Head of Service (Education),
on 01294 324413. 
Background Papers
0
26

Page 27

1   |    Dykesmains Primary School, North Ayrshire Council, 8213429 © Crown Copyright
12 December 2023
Dear Parent/Carer
In October 2023, a team of inspectors from Education Scotland visited Dykesmains Primary
School. During our visit, we talked to parents/carers and children and worked closely with
the headteacher and staff.
The inspection team found the following strengths in the school’s work.
• The highly effective leadership of the headteacher, and senior leaders, in raising attainment
and achievement, and in ensuring positive outcomes for children. This includes them
engaging in robust monitoring and tracking of children’s progress.
• The collaborative work of staff in continuing to improve learning, teaching and assessment.
• The positive relationships between all staff and children. Children are supported well within a
calm, nurturing and purposeful learning environment.
• Children’s attainment in numeracy and in listening and talking.
• The skills that children develop through their participation in a wide range of opportunities to
achieve.
The following areas for improvement were identified and discussed with the headteacher and
representatives from North Ayrshire Council.
• Develop further the use of assessment in all areas of the curriculum to demonstrate
children’s progress across their learning more easily.
• Continue to improve children’s progress in writing.
Appendix 1
27

Page 28

2   |    Dykesmains Primary School, North Ayrshire Council, 8213429 © Crown Copyright 
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Dykesmains Primary
School 
Quality indicators Evaluation
Learning, teaching and assessment very good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Details | Find an inspection report | Find an inspection report | Inspection and Review |
Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Dr Celia McArthur
HM Inspector 
28

Page 29

1   |    St Mark’s Primary School, North Ayrshire Council, 8217521 © Crown Copyright
6 February 2024
Dear Parent/Carer 
In December 2023, a team of inspectors from Education Scotland visited St Mark’s Primary
School. During our visit, we talked to parents/carers and children and worked closely with
the headteacher and staff. 
St Mark’s Primary School nursery class was inspected by the Care Inspectorate within the past
18 months. Therefore we have agreed with the local authority and school that the nursery class
is not part of this inspection. 
The inspection team found the following strengths in the school’s work. 
• The school’s vision, values and aims, underpinned by the Gospel values, support a
positive climate for learning. Children benefit from nurturing and mutually respectful
relationships with staff. 
• The headteacher and staff’s dedication to supporting children and families experiencing
financial barriers. They adopt approaches which help children to feel ready and better
able to learn and maintain the dignity of families. 
• Staff work with partners effectively to offer children a range of achievements and
learning opportunities. These help children to develop important skills.   
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
• Staff should develop a shared understanding of high-quality learning and teaching. This
will help improve the consistency of learners’ experiences and support children’s
progress in learning as a result.   
• Teachers should continue to develop their use of assessments to measure children’s
progress and identify their next steps in learning. They should work together and with
colleagues from other schools to regularly review and apply national standards
confidently. 
• Senior leaders and teachers should continue to raise attainment in literacy and
numeracy across the school. 
29

Page 30

2   |    St Mark’s Primary School, North Ayrshire Council, 8217521 © Crown Copyright 
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for St Mark’s Primary School 
Quality indicators Evaluation
Learning, teaching and assessment satisfactory
Raising attainment and achievement satisfactory
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: Details | Find an inspection report | Find an inspection report |
Inspection and Review | Education Scotland 
What happens next?
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Mr Graham Parry 
HM Inspector 
30

Page 31

1   |   Winton Primary School, North Ayrshire Council, 8210624 
© Crown Copyright
27 February 2024
Dear Parent/Carer 
In December 2023, a team of inspectors from Education Scotland visited Winton Primary
School. During our visit, we talked to parents/carers and children and worked closely with
the headteacher and staff. 
Winton Early Years Class was inspected by Care Inspectorate within the past 18 months.
Therefore, we have agreed with the local authority and school that the nursery class is not part
of this inspection. 
The inspection team found the following strengths in the school’s work. 
• Led ably by senior leaders, staff, children and families work very well together as part
of the ‘Winton family’ to promote positive and respectful relationships. As a result,
children enjoy school, behave well and engage positively in their learning. 
• The whole staff team have developed inclusive learning environments that support
children who require help with their learning. This enables children to improve their
wellbeing, make good progress and achieve well. 
• Staff develop their practice well through strong professional partnerships and
collaboration as a team. This is improving children’s experiences. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
• Continue to strengthen the use of assessment information to plan learning which is
consistently at the right level of difficulty for all children. 
• Continue to raise attainment and achievement for children across the school. This will be
supported by evidencing more clearly the impact support for individuals and groups has on
their progress and attainment. 
31

Page 32

2   |   Winton Primary School, North Ayrshire Council, 8210624 
© Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Winton Primary School. 
Quality indicators Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: Details | Find an inspection report | Find an inspection report |
Inspection and Review | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Gillian Frew
HM Inspector 
32

Page 33

1   |   Cumbrae Primary School and Nursery Class, North Ayrshire Council, 8218226 © Crown Copyright
23 April 2024
Dear Parent/Carer 
In January 2024, a team of inspectors from Education Scotland visited Cumbrae Primary
School and Nursery Class. During our visit, we talked to parents/carers and children and
worked closely with the headteacher and staff. 
The inspection team found the following strengths in the school’s work:
• The positive nurturing relationships between all staff and children in the school and
nursery. Children are confident, secure and engage very well in learning.
• The highly respected and aspirational headteacher who is driving school improvement. 
She is supported very well by an effective and resilient staff team. Together they are
successfully improving children’s attainment, experiences and outcomes.
• The high-quality experiences, including outdoor learning, community projects and learning
through play. Learning is well planned and effectively supported by a range of partners.
This is leading to positive outcomes for children. 
The following areas for improvement were identified and discussed with the headteacher and
representatives from North Ayrshire Council.
• Provide children with further opportunities to lead their learning and recognise the skills
they are developing through learning experiences.
• Continue to develop the nursery environment, both indoors and outside, to ensure all
curriculum areas are planned well. Ensure that children are engaged and challenged fully
in their learning.
• In the nursery, continue to develop play and learning experiences around the wellbeing
indicators. This will support children to develop a greater sense of their own health and
wellbeing.  
33

Page 34

2   |   Cumbrae Primary School and Nursery Class, North Ayrshire Council, 8218226 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition) and How good is our early learning and childcare?.
Quality indicators help schools, local authorities and inspectors to judge what is working well
and what needs to be improved. Following the inspection of each school, the Scottish
Government gathers details of our evaluations to keep track of how well Scottish schools are
doing. 
Here are Education Scotland’s evaluations for Cumbrae Primary
School and Nursery Class 
Quality indicators for the primary stages Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion very good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Leadership of change  good
Learning, teaching and assessment good
Ensuring wellbeing, equality and inclusion good
Securing children’s progress good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Find an inspection report | Education Scotland
34

Page 35

3   |   Cumbrae Primary School and Nursery Class, North Ayrshire Council, 8218226 © Crown Copyright
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Nicola Drew
HM Inspector 
35

Page 36

1   |   Gateside Primary School and Early Years Class, North Ayrshire Council, 8211329 © Crown Copyright
28 May 2024
Dear Parent/Carer 
In April 2024, a team of inspectors from Education Scotland and the Care Inspectorate visited
Gateside Primary School and Early Years Class. During our visit, we talked to parents/carers
and children and worked closely with the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• Children in the school and nursery class who are highly confident and kind to each
other, adults and visitors. In the nursery, children have fun in their environment and in
the school, children are eager, motivated learners. 
• The strong nurturing relationships that exist across the school and nursery class
between staff, children and their families. These relationships support children well to
respect themselves and others. 
• The strong sense of teamwork between staff and their willingness to take on
leadership roles based on their professional learning. Senior leaders support and
guide staff well to improve children’s learning experiences, particularly in literacy. 
• The approaches senior leaders and staff take to identify children’s barriers to learning
quickly and address their needs. This is helping staff to get it right for every child in the
school and nursery class. 
• The high levels of attainment of children across the school and nursery. Children
make very good progress in their learning and development. 
The following areas for improvement were identified and discussed with the headteacher and
a representative from North Ayrshire Council. 
• Senior leaders and all staff should continue to work on areas identified within the
school and nursery class improvement plan. 
36

Page 37

2   |   Gateside Primary School and Early Years Class, North Ayrshire Council, 8211329 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition) and How good is our early learning and childcare?.
Quality indicators help schools, local authorities and inspectors to judge what is working well
and what needs to be improved. Following the inspection of each school, the Scottish
Government gathers details of our evaluations to keep track of how well Scottish schools are
doing. 
Here are Education Scotland’s evaluations for Gateside Primary
School and Early Years Class 
Quality indicators for the primary stages Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion very good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion very good
Securing children’s progress very good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
37

Page 38

3   |   Gateside Primary School and Early Years Class, North Ayrshire Council, 8211329 © Crown Copyright
We gathered evidence to enable us to evaluate the early learning and childcare setting using
the quality indicators from A quality framework for daycare of children, childminding and
school-aged childcare. The framework supports settings, providers and inspectors to assess
what is working well and what needs to be improved. Following the inspection of each
setting, the Scottish Government gathers details of our evaluations to keep track of how well
early learning and childcare settings are doing. The Care Inspectorate evaluations are also
used by local authorities when considering how settings are meeting the national standard for
funded early learning and childcare. 
The Care Inspectorate’s evaluations for the early learning and
childcare setting are: 
Detailed evaluations  Evaluation 
Key question 1:
How good is our care, play and learning? very good
1.1 Nurturing care and support  very good
1.3 Play and learning  very good
Key question 2:
How good is our setting? very good
2.2 Children experience high quality facilities very good
Key question 3:
How good is our leadership? very good
3.1 Quality assurance and
improvement are led well very good
Key question 4:
How good is our staff team? very good
4.3 Staff deployment very good 
Requirements made by the Care Inspectorate for the early learning and childcare
setting. 
As a result of the inspection, no requirements were made. 
Areas for improvement made by the Care Inspectorate for the early learning and
childcare setting. 
As a result of the inspection, no areas for improvement were made. 
38

Page 39

4   |   Gateside Primary School and Early Years Class, North Ayrshire Council, 8211329 © Crown Copyright
A more detailed document called Summarised Inspection Findings (SIF) will be available
on the Education Scotland website at: Details | Find an inspection report | Find an
inspection report | Inspection and review | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will
make no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Helen Mulholland Eileen McColgan
HM Inspector  Care Inspector 
39

Page 40

1   |    Kilmory Primary School and Nursery Class, North Ayrshire Council, 8200424 © Crown Copyright
27 August 2024
Dear Parent/Carer
In May 2024, a team of inspectors from Education Scotland visited Kilmory Primary School and
Nursery Class. During our visit, we talked to parents/carers and children and worked closely
with the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• Staff support children to feel welcomed and cared for across the school and nursery.
Children experience positive, respectful and nurturing relationships which is impacting
positively on their motivation to learn. 
• Children are friendly, curious and confident. They have a positive attitude to their school and
benefit from local partnerships in the community. 
• In the nursery, staff use stimulating outdoor and real-life learning contexts to engage
children in meaningful and relevant activities. This supports children in the nursery to make
good progress in their learning. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council.
• Develop consistently high-quality approaches to learning and teaching across the school.
Ensure that learning activities are challenging enough and well matched to the needs of all
children. 
• Improve approaches to assessing and tracking children’s progress across the school and
nursery. Ensure that all children build on prior learning and experience activities that support
them to lead their own learning. 
• Improve approaches to meeting the learning needs of all children including those who
require additional support with their learning. Staff should work with children to set clear,
measurable targets that help children make better progress in their learning. 
• Improve attainment in literacy and numeracy across the school. 
40

Page 41

2   |    Kilmory Primary School and Nursery Class, North Ayrshire Council, 8200424 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition) and How good is our early learning and childcare?. Quality
indicators help schools, local authorities and inspectors to judge what is working well and what
needs to be improved. Following the inspection of each school, the Scottish Government
gathers details of our evaluations to keep track of how well Scottish schools are doing.
Here are Education Scotland’s evaluations for Kilmory Primary School
and Nursery Class 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment satisfactory
Raising attainment and achievement satisfactory
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment good
Securing children’s progress good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: Inspection and review | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Anne Graham
HM Inspector
41

Page 42

1   |    Pirnmill Primary School, North Ayrshire Council, 8200521 © Crown Copyright
27 August 2024
Dear Parent/Carer
In May 2024, a team of inspectors from Education Scotland visited Pirnmill Primary School.
During our visit, we talked to parents/carers and children and worked closely with the acting
headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• Children are happy, friendly and keen to learn. They benefit from positive and caring
relationships across the whole school community that support the wellbeing of children and
families. This is supported by senior leaders and staff who understand the island and rural
context of the local community. 
• Strong partnerships which help improve children's wellbeing, enhance learning experiences
and support children at times of change. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
• Staff should develop approaches to support children to lead their own learning. This should
include more regular, planned learning conversations. This will enable children to better
understand what they have achieved and what is next for them in their learning. 
• Senior leaders, with support from the local authority, should develop further an effective
strategic approach that supports staff to raise attainment and achievement for all children.
This should include embedding processes to plan, track and assess children’s learning. 
• Senior leaders should prioritise and support the improvement of the quality of learning,
teaching and assessment to ensure all children make the best possible progress. 
• All staff should further develop the use of data to track more clearly how much and how well
children progress over time. They should use this information to plan learning that
challenges children to make the best possible progress. 
42

Page 43

2   |    Pirnmill Primary School, North Ayrshire Council, 8200521 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Pirnmill Primary School 
Quality indicators Evaluation
Learning, teaching and assessment weak
Raising attainment and achievement weak
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Details | Find an inspection report | Find an inspection report | Inspection and review |
Education Scotland 
What happens next? 
As a result of our inspection findings, we think that the school needs additional support and
more time to make necessary improvements. We will liaise with North Ayrshire Council
regarding the school’s capacity to improve. We will return to carry out a further inspection of the
school within one year of the publication of this letter. We will discuss with North Ayrshire
Council the details of this inspection. When we return to inspect the school, we will write to you
as parents/carers informing you of the progress the school has made. 
Louise Phillips
HM Inspector 
43

Page 44

How good is our school?
Appendix 3: The six-point scale
The six-point scale is a tool for grading the quality indicators. It is mainly used
by Education Scotland, local authorities and other governing bodies for the
purpose of national and/or local benchmarking across a number of establishments.
It is not necessary for individual schools to measure themselves against the
six-point scale although they may choose to do so. It should be noted that, when
a grading is applied, it is for the whole quality indicator. Individual themes
should not be graded. In education, an evaluation can be arrived at in a range
of contexts. We need to bear in mind that awarding levels using a quality scale
will always be more of a professional skill than a technical process. However,
the following general guidelines should be consistently applied.
Excellent An evaluation of excellent means that this aspect of the school’s work
is outstanding and sector-leading. The experiences and achievements
of all children and young people are of a very high quality. An evaluation
of excellent represents an outstanding standard of provision which
exemplifies very best practice, based on achieving equity and inclusion
and a deep professional understanding which is being shared beyond
the school to support system-wide improvement. It implies that very
high levels of performance are sustainable and will be maintained.
Very good An evaluation of very good means that there are major strengths in
this aspect of the school’s work. There are very few areas for
improvement and any that do exist do not significantly diminish
learners’ experiences. An evaluation of very good represents a high
standard of provision for all children and young people and is a
standard that should be achievable by all. There is an expectation that
the school will make continued use of self-evaluation to plan further
improvements and will work towards improving provision and
performance to excellent.
Good An evaluation of good means that there are important strengths within
the school’s work yet there remains some aspects which require
improvement. The strengths have a significantly positive impact on
almost all children and young people. The quality of learners’
experiences is diminished in some way by aspects in which
improvement is required. It implies that the school should seek to
improve further the areas of important strength, and also take action to
address the areas for improvement.
Satisfactory An evaluation of satisfactory means that the strengths within this
aspect of the school’s work just outweigh the weaknesses. It indicates
that learners have access to a basic level of provision. It represents a
standard where the strengths have a positive impact on learners’
experiences. While the weaknesses are not important enough to have
a substantially adverse impact, they do constrain the overall quality of
learners’ experiences. The school needs to take action to address
areas of weakness by building on its strengths.
Weak An evaluation of weak means that there are important weaknesses
within this aspect of the school’s work. While there may be some
strength, the important weaknesses, either individually or collectively,
are sufficient to diminish learners’ experiences in substantial ways. It
implies the need for prompt, structured and planned action on the part
of the school.
Unsatisfactory An evaluation of unsatisfactory means there are major weaknesses
within this aspect of the school’s work which require immediate
remedial action. Learners’ experiences are at risk in significant
respects. In almost all cases, this will require support from senior
managers in planning and carrying out the necessary actions to effect
improvement. This will usually involve working alongside staff in other
schools or agencies.
62 63
Appendix 2
44

Page 45

_____________________________________________________
NORTH AYRSHIRE COUNCIL 
3rd December 2024            
Cabinet 
Title: Proxy Voting for Councillors
___________________________________________________________________
Purpose: To advise Cabinet of a consultation on a proposal to allow proxy
voting for councillors and seek views and agreement on a
proposed response. 
Recommendation: That Cabinet (i) notes the consultation on proxy voting for
Councillors; (ii) agrees to submission of the consultation
response attached at Appendix 1 and (iii) agrees to receive
further updates as the consultation process progresses. 
___________________________________________________________________
1. Executive Summary
The Scottish Government has opened a consultation on a proposal to allow
proxy voting by councillors. It is considered that proxy voting in the Council is
not required due to the limited circumstances when it could be used.  It would
not be suitable for decisions in quasi-judicial and regulatory committees and for
many decisions of full Council where full impacts and implications require to be
taken into account by the members participating as part of the decision-making
process. A draft response to the consultation providing qualified agreement to
the proposal is attached at Appendix 1.
Background 
1.1 The Local Government Scotland Act 2003 permits local authority meetings to
be conducted on a hybrid basis. The members present either in person or online
cast their vote on an individual basis. There is no legislative provision to enable
voting by proxy in the event of the absence of a Councillor through illness or
parental leave. 
1.2 The Scottish Government is consulting on a proposal to amend the Local
Government (Scotland) Act 1973 to enable a Councillor to have their vote cast
by proxy and which will further require the Council to publish a scheme setting
out how proxy voting would work where Council decides to introduce it. The
consultation can be viewed here: consultation on a proposal to allow proxy
voting by councillors.
Agenda Item 5
45

Page 46

1.3 The consultation recognises that there may be other ways, short of proxy voting
which would aid decision making including the appointment of named
substitutes or informal pairing agreements whereby two individuals from
opposing parties both agree not to vote to enable a councillor to be absent
without affecting the balance of the vote. 
1.4 There is provision within the Council’s Standing Orders which provides for a
substitute Member to attend certain committees of council in the event of the
non-availability of the principal Member. These include the Appeals Committee,
the Staffing and Recruitment Committee and the Ayrshire Economic Joint
Committee.  These provisions could be further extended but would not apply to
full Council. Were named substitutes to be included for regulatory committees,
those named substitutes would also require to undertake the necessary training
to be able to participate in the decision-making process. For the Licensing
Board, this would come at additional cost due to the external test which
Councillors require to take. Named substitutes on quasi-judicial and regulatory
committees would not be able to vote based on a direction from the principal
appointee as the decision cannot be pre-determined. Attendance at regulatory
committees requires consideration of the circumstances set out in the report
and the decision is taken in accordance with any statutory provisions, policy
and representations to ensure that a fair, transparent and sound decision is
taken. It is not anticipated that proxy voting would be widely applicable to the
governance of the Council. 
1.5 The consultation document relates to a framework proposal at this stage and
advises that even if the consultation supports the introduction of proxy voting,
there is no legislative time available to introduce the necessary amendment to
parliament. Any legislative amendment introduced would not be prescriptive
and the operational details and criteria for any proxy voting scheme would not
be set out in the legislation. It would be for local authorities to determine how
any scheme would operate in practice. The Scottish Government does propose
that the following criteria would be included in the operational agreement on
proxy voting:
• maternity leave, paternity leave, parental leave, shared parental leave
or adoption leave;
• complications arising from pregnancy, childbirth, miscarriage or baby
loss;
• serious long-term illness or injury;
• bereavement;
• attending to a person who is near the end of their life;
• any other reason subject to agreement of the full Council. 
1.6 A proposed consultation response is attached at Appendix 1. The response
includes the following points:
46

Page 47

• Proxy voting in the Council is not required due to the limited
circumstances when it could be used.  It would not be suitable for
decisions in quasi-judicial and regulatory committees where decisions
cannot be pre-determined and for many decisions of full Council where
full impacts and implications e.g. in relation to the Fairer Scotland Duty,
Public Sector Equality Duty, ECHR, UNCRC and Islands Duty require to
be taken into account by the members participating as part of the
decision-making process. To do otherwise could result in any decision
being open to legal challenge.
• If Parliament decides that proxy voting is introduced:
o Individual Councils should determine its applicability to their own
circumstances.
o It would not be appropriate for all committees and decisions.
o It should not be used to circumvent the provisions of Section 35
of the Local Government (Scotland) Act 1973 in relation to
Councillor attendance.
o A Member who has been suspended by the Standards
Commission should not be allowed to exercise a proxy vote.
o A Member who has an interest to declare may not arrange for
another Member to exercise a proxy vote.
o The limited nature of it suitable application should be noted and
individual local authorities should have complete autonomy as to
its introduction and application. 
2. Proposals 
2.1 That Cabinet i) notes the consultation on proxy voting for Councillors; (ii) agrees
to submission of the consultation response attached at Appendix 1 and (iii)
agrees to receive further updates as the consultation process progresses. 
3. Implications / Socio-economic Duty
Financial
3.1 None in relation to the consultation.  
Human Resources
3.2 None arising from this report. 
Legal
3.3 None arising from this report. 
Equality / Socio-economic
3.4 None arising from this report. 
Environmental and Sustainability
47

Page 48

3.5 None arising from this report.
Key Priorities
3.6 The proposals outlined in this report will be of relevance to the Council’s priority
of communities, local democracy and a sustainable council. 
Community Wealth Building
3.7 None. 
4. Consultation
With Monitoring Officers of other local authorities. 
Aileen Craig
Head of Service, Democratic Services 
For further information please contact Aileen Craig, Head of Democratic
Services by email to acraig@north–ayrshire.gov.uk 
48

Page 49

APPENDIX 1 
Consultation on proposal to Allow Proxy Voting by Councillors 
Consultation Questions 
Question 1
Do you agree that an explicit provision should be introduced to allow a
councillor to arrange for their vote to be cast by proxy 
(YES/NO) Proposed Response: No 
Question 2
Do you agree with the optional criteria set out at paragraph 12 which could be
applied by a local authority to allow for proxy voting? 
(YES/NO) Proposed Response: N/A 
Question 3
Are there any further comments that you wish to make on the proposal to
allow for proxy voting (free text, 300 word maximum)?
North Ayrshire Councils considers that this proposal would have limited applicability
and for its purposes is not required. The Council already has provision for substitutes
on committees which could be extended as necessary and for many decisions, proxy
voting would not be permissible. If legislative provision is brought forward, it would
be important that any legislative amendments would permit rather than mandate a
Council to introduce proxy voting with individual arrangements being a matter for
each Council to determine in accordance with its own political and demographic
circumstances and governance structures.  The Council would wish the following
points to be taken into account if proxy voting is to be advanced:- 
• Proxy voting should not apply to quasi-judicial and regulatory
committees where decisions cannot be predetermined.
• Proxy voting would not be appropriate in circumstances where a decision
requires to be taken and in respect of which various statutory duties
apply e.g. the Fairer Scotland Duty, Islands Duty, Public Sector Equality
Duty, ECHR, UNCRC. In those circumstances Members voting would
require to participate in the meeting and take into account the full report
and any debate prior to a decision being taken. To act otherwise, may
result in a legal challenge to the Council’s decision-making process. 
• Proxy voting should not be used to circumvent the provisions of Section
35 of the Local Government (Scotland) Act 1973 in relation to Councillor
attendance.
49

Page 50

• A Member who has been suspended by the Standards Commission
should not be allowed to exercise a proxy vote.
• A Member who has an interest to declare may not arrange for another
Member to exercise a proxy vote.
• A member who has arranged for a proxy to vote on their behalf should
not count towards a quorum at the meeting;
50

Page 51

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet 
Title:    Procurement Annual Activity Report (23-24) 
Purpose:  To provide Cabinet with an update on procurement activity for
the period 23/24 
Recommendation:  Cabinet notes the report 
1. Executive Summary 
1.1 It was agreed by Council in September 2020 that a procurement annual activity report
would be produced for Cabinet.  This is the fifth report, for the period 23-24. 
1.2 Award Activity - During the report year 162 different procurement exercises were
awarded to 191 suppliers for a total value of £173.5m. 
1.3 Governance - Procurement is governed by public sector procurement legislation and
the Council’s Standing Orders Relating to Contracts. North Ayrshire Council have a
legal obligation to publish a Contract Register, Procurement Annual Report and
Procurement Strategy. 
1.4   Spend Analysis - North Ayrshire Council spent a total of £292.3m with 3630 suppliers.
The report contains information on spend by category, spend distribution, the top 20
suppliers by spend, the size, type, and location of suppliers.   
1.5 Community Wealth Building - £71.5m was spent locally with 879 suppliers which was
an increase of £14m from the previous year. The local spend percentage was 24.5%,
which meant the 27% Council Plan target was not reached, however, local
subcontracting of £10m was reported and if this could have been included, the local
spend percentage would have been 28%. The report also contains information on local
spend and percentage fluctuation, local spend distribution, and local spend by category. 
North Ayrshire Council’s Business Support and Development Team continue to work
closely with suppliers and the Corporate Procurement Unit to identify and support local
suppliers to maximise their success winning contracts within legislative limitations. Local
contracts awarded increased to £16.8m, which was an increase of £9.5M since 22-23. 
Agenda Item 6
51

Page 52

1.6 Community Benefits - Community benefits delivered are detailed including 3567
employment weeks, equating to 69 jobs and 42 wish list projects. 
1.7  Improvement Activity - The report also provides details of ongoing improvement
activity including adding more suppliers to e-invoicing, creating sustainability case
studies and carrying out operation workshops to drive improvement of templates,
guidance and processes. 
1.8   Procurement Commercial Improvement Programme - A capability assessment was
carried out by Scotland Excel in November 2023 and the Corporate Procurement Unit
achieved advanced practice in 9 out of the 11 areas assessed. 
2. Background 
2.1 At the Council meeting in September 2020, it was agreed Cabinet would receive a
detailed annual report covering all procurement activity.  This report covers 23-24
procurement activity. 
Award Activity 
2.2 During the 23-24 period, 162 different procurement exercises were progressed by the
Corporate Procurement Unit, resulting in contracts being awarded to 191 suppliers for
a total value of £173,544,036.25.  The different procurement types undertaken are listed
below: 
Procurement Type
Number of
Procurements
Awarded
Total Value Awarded
Quick Quotes Awarded 53  £           3,782,415.93 
Single Tender Actions Awarded 38  £           3,393,399.27 
Direct Awards Awarded 18  £           5,180,128.91 
GPA Tenders Awarded 19  £       112,399,710.58 
GPA Multi Supplier Awarded 5  £           8,732,462.00 
Non-GPA Tenders Awarded 13  £          15,767,634.42
Non-GPA Multi Supplier Awarded 2  £            4,910,000.00
Mini Competitions Awarded 14  £           19,378,285.14 
Total 162  £         173,544,036.25 
Governance 
2.3   Public sector procurement legislation regulates procurement activity for goods, 
services or works and the regulations North Ayrshire Council need to comply with are 
noted below: 
• Procurement Reform (Scotland) Act 2014
• Public Contracts (Scotland) Regulations 2015
• Procurement (Scotland) Regulations 2016 
Each regulation has specific thresholds and compliance requirements, and failure to
comply could lead to costly legal challenges.  In addition to the external legislation the
52

Page 53

Council’s Standing Orders Relating to Contracts also has requirements on how officers
are permitted to procure.  The diagram below shows the activity required at specific
values.
Procurements above £10k are progressed via the optimal compliant procurement
route, which could be Quick Quote, Tender, Framework Call-off or Single Tender
Action. Frameworks frequently utilised are mainly owned by Scotland Excel, Scottish
Government, Crown Commercial Service and the 3 Ayrshire Councils. 
2.4 North Ayrshire Council has a legal obligation to publish a Contract Register of all “live”
contracts, and an Annual Procurement Report on its regulated procurements (over £50K
for supplies and services and over £2M for works) This gives potential suppliers visibility
of future tendering opportunities. A Procurement Strategy is also published and
refreshed annually. 
Spend Analysis 
2.5 During the report period North Ayrshire Council spent £292.3m with 3630 suppliers. 
2.6 North Ayrshire Council buys a wide range of supplies, services and works and the table
below details the top 10 categories by value, and the number of suppliers used within
each category. 
vCode Business Sector    Total Spend  Total Suppliers
Construction  £    131,063,797.77  325
Social Care and Services  £    65,319,257.53  318
Facilities Management   £    24,023,246.57 138
Utilities & Energy  £    18,175,758.28 33
Arts, Sports & Leisure  £      7,406,955.41 101
ICT   £      6,079,078.82 118
Vehicles  £      5,435,535.05 60 
Waste & Environmental services   £      5,306,076.90 61
Healthcare  £      4,640,568.37 77
Food Beverage & Catering  £      3,571,624.61 62
Total  £  271,021,899.31 1293 
2.7 An analysis of the spend by suppliers shows that 47 of the 3630 suppliers, received
more than £1m (67%) and at the opposite end of the spend profile, 2015 suppliers
received less than £2,000 (0.3%). The top 20 suppliers by spend (see appendix 1)
account for £154.5m (53%). 
Up to £2,000  Single
Quote
£2,000 to £9,999 
Minimum 3 Written
Quotes
> £10,000 approach 
Corporate
Procurement Unit
Quick Quote,
Tender, Framework
Call-off, Single
Tender Action
53

Page 54

2.8 This dataset shows that most suppliers are Scottish, and the chart below shows the
amount spent per supplier size in each of the 4 nations. 
2.9   The data also shows, that where the size of the company is known, 79% are small or
medium enterprises and the chart below confirms most companies fall in the small
company definition i.e., less than 50 employees. 
2.10 It is also recognised that Third Sector Organisations have a key role in delivering vital
services for North Ayrshire citizens and strengthening community empowerment and
during 23-24 just over £37m was spent with 130 Thirds Sector Organisations. 
21%
30%
49% Large
Medium
Small
54

Page 55

Community Wealth Building 
2.11 From a Community Wealth Building perspective, buying from local companies is a
strategic priority for North Ayrshire Council, however procurement legislation does not
permit preferential treatment based on location.   
In the year covered by the report £71.5m (24.5%) was spent with 878 local suppliers
which was an increase of £14m from the previous year. However, the local spend
percentage decreased by 1.5% due to an increase of £71m in total spend because of
large capital projects, including flood protection schemes, building construction, and
enabling works. These contracts were mainly awarded to tier one contractors, which do
not exist in North Ayrshire. The Council Plan local spend target of 27% by 2024, was
not reached, however the Corporate Procurement Unit approached these non-local tier
one contractors (see the table below), who confirmed £10m of spend was subcontracted
locally, and if this spend could have been included, the local spend percentage would
have been 28%.       
Company Local Subcontracted Spend
Muir Construction £643,000.00
Marley Contract Services £4,339,235.60
Connect Modular £220,764.50
Sanctus £550,000.00
RJ McLeod £1,000.00
Kiely Bros £28,000.00
Redpath Construction £391,783.60
Van Oord UK Ltd £30,358.00
Hub South West Scotland £3,296,829.00
John McGeady Limited £535,400.00
Total £10,036,370.70 
The increase in local spend came from a mixture of different spend categories including
the arts, sport & leisure, education, healthcare, social care and services, travel &
accommodation and waste & environmental services. 
There are many variables that can cause future fluctuation including: 
• The existence, capacity, and competitiveness of the local supply base,
• Fluctuation in North Ayrshire Council’s requirements/budgets,
• Providing services in-house rather than outsourcing,
• The number of local suppliers awarded places on National Frameworks,
• An increase in total spend, without a corresponding increase in local spend. 
55

Page 56

2.12 The graphs below show both the local spend increase and local spend percentage
increase over the last 10 years.         
The actual spend data shows a steady increase throughout the 10-year period, with the
local spend more than doubling from £31.9m in 14-15 to £71.5m in 23-24 and the local
spend percentage increasing to 24% in 23-24 from 19% in 14-15. 
2.13 The top 19 local suppliers by value all received more than £1m, with a total value of
£42m (59%) and at the opposite end of the spend spectrum 397 local suppliers received
less than £2,000, with a total value of £209k (0.3%). The graph below shows the spend
distribution across local suppliers.   
14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24
Local spend £m £31.90 £35.70 £37.30 £44.70 £41.90 £43.20 £45.10 £51.20 £57.60 £71.50
£0.00
£10.00
£20.00
£30.00
£40.00
£50.00
£60.00
£70.00
£80.00
LOCAL SPEND £M
14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24
Percentage 19% 18% 20% 23% 20% 20% 21% 23% 26% 24%
19% 18% 20% 23% 20% 20% 21% 23% 26% 24%
0%
5%
10%
15%
20%
25%
30%
LOCAL SPEND PERCENTAGE
19 15
53 25
155
214
397
0
50
100
150
200
250
300
350
400
450
£1m or more 500k to £1m 100k to 500k 50k to 100k 10k to 50k 2k to 10k less than £2k
56

Page 57

2.14 An analysis of the spend with local suppliers shows that over 75% was spent within
the Social Care and Construction sectors.  
Category Value Percentage
Social Care & Services £40,027,404.19 56%
Construction £14,253,826.59 20%
Arts, Sport & Leisure £6,388,608.04 9%
Travel & Accommodation £3,098,697.74 4%
Healthcare £1,916,679.02 3%
Education £1,890,059.94 3%
Waste & Environmental Services £990,346.29 1%
Facilities Management £918,938.45 1%
Human Resources £294,671.56 1%
Other £1,756,894.07 2% 
2.15 North Ayrshire Council’s Corporate Procurement Unit and service teams work together
to maintain a tender waveplan of all future tendering opportunities and they also
participate in bidder’s days and meet the buyer events to raise awareness of
opportunities for local suppliers. 
2.16 North Ayrshire Council’s Business Support and Development Team continued to
engage and support local suppliers across North Ayrshire, and during 23/24 138
businesses received support, with 59 of these businesses receiving one to one
consultancy support. 
The support provided focused on capacity building, putting suppliers forward for North
Ayrshire Council Quick Quotes and Tenders, utilising specialist consultancy support,
advising suppliers how to register and use Public Contracts Scotland advertising portal
and Public Contracts Scotland-Tender e-tendering system, and signposting to other
procurement related resources such as the Supplier Development Programme. 
The Business Support and Development Team continue to work closely with the
Corporate Procurement Unit to identify suitable local businesses as early in the
procurement process as possible. This work means the team have further influence on
smaller value spend for goods, services and works and this has led to individual service
teams reaching out. For example, Property Maintenance and Investment, Streetscene
and Health and Social Care Partnership teams have sought recommendations to gather
quotes for jobs under £10k, resulting in local companies successfully winning work when
they would otherwise have remained unknown to the service. 
A focus also remains on actively encouraging local suppliers to bid on national
frameworks, and although this does not guarantee spend it creates a pathway to
supplying a product/service to any council when there is a requirement. 
2.17 Cabinet previously approved North Ayrshire Council’s response to the Scottish
Government consultation on Building Community Wealth in Scotland on 2 May 2023.
The response included potential amendments to the Procurement Reform (Scotland)
Act 2014 to better support local suppliers where the supply base exists and reviewing
the regulated threshold for supplies and services. The Bill will seek to address economic
and wealth inequality by supporting the retention of more wealth in local and regional
57

Page 58

economies. It will seek to ensure consistent implementation of the Community Wealth
Building model of economic development across Scotland. 
For lower value procurements, between £10K and £50K for supplies and services and
between £10K and £500K for works, North Ayrshire Council continue to utilise the
Community Wealth Building Quick Quotes process. During 23-24, 53 Quick Quotes with
a value of £3.7m were awarded of which 10 were awarded to local suppliers (£813k -
21%). For all other types of procurement exercise (Tenders, Framework Call-offs, Single
Tender Actions) including Quick Quotes £16.8m were awarded locally. This was an
increase of £9.5M since 22-23.     
Community Benefits 
2.18  As part of the procurement process, community benefits are requested either on a
voluntary or mandatory basis, dependant on the value of the proposed contract. The
community benefits requested during 23-24 focused on employment and training, with
a focus on priority groups, supply chain support, education support and community
support. The table below shows what was delivered during 23-24.               
Improvement Activity 
2.19 Additional improvement activities were carried out throughout the year to improve
procurement services. 
The e-invoicing project continued to progress during 23-24 with an additional 4 suppliers
being added, increasing the number of suppliers participating in this process to 11.
Further rollout of the project is planned for 24-25. 
To support North Ayrshire Council’s net-zero journey, The Corporate Procurement Unit
continued to procure all goods, services and works that support the reduction of climate
change impact and adaptation and in addition created 2 sustainability case studies for
the design and build of 6 Amenity bungalows at Afton Court Stevenston (modular
housing) and Millport flood protection. Both case studies are published on the Scottish
Government Sustainable Procurement Tools website. 
Quarterly operation workshops were also carried out to share and implement new ideas
for improvement, and as result numerous templates, guidance documents and
processes were amended to support continuous improvement.   
Procurement Commercial improvement Programme 
69 Jobs
3567
Employment
Weeks
25 Work
Placements
2 SME/TSO
Workshops
9 School
Projects
18
Community
Projects
42 Wish List
Projects
14
Employability
Sessions
34 Job/Career
Fairs
58

Page 59

2.20 The Corporate Procurement Unit undertook the Procurement and Commercial
Improvement Programme assessment in November 2023 and scored advanced
practice in 9 out of the 11 areas assessed, detailed below. 
The assessment was carried out by Scotland Excel on behalf of the Scottish
Government. 
Question Level
Achieved
Level Description
1.1 Leadership and Governance 4 Advanced Practice
1.2 Procurement Strategy 4 Advanced Practice
1.3 Climate Change 4 Advanced Practice
1.4 Learning and skills 4 Advanced Practice
1.5 Risk Management 4 Advanced Practice
1.6 Commercial Acumen 4 Advanced Practice
1.7 Continuous Improvement 4 Advanced Practice
2.1 Implementation & Exit Strategies 4 Advanced Practice
3.1 Contract & Supplier Management 3 Good Practice
3.2 Contractual Obligations & Additional Benefits 4 Advanced Practice
3.3 Lessons Learned 2 Improving 
Developing Level 1
Improving Level 2
Good Practice Level 3
Advanced Practice Level 4 
Improvement activity that contributed to the achievement levels included:  
• Involvement in in-house vs outsource decisions,
• Creation of sustainability case studies,
• Creation and maintenance of a net-zero roadmap,
• Monitoring FNT2030 templates for fleet, waste, ICT and building services,
• Implementation of a risk management plan,
• Implementation of a Contract and Supplier Management Policy. 
3. Proposals 
3.1 Cabinet notes the contents of the report. 
4. Implications/Socio-economic Duty 
Financial 
4.1 No direct financial implications within this report, however, all progress in growing the
level of local spend will continue to be set within the context of North Ayrshire Council’s
duty to secure Best Value. 
Human Resources 
4.2 None. 
59

Page 60

Legal 
4.3 North Ayrshire Council’s procurement activities comply with all relevant public
procurement legislation and the Council’s Standing Orders. 
Equality/Socio-economic 
4.4 North Ayrshire Council’s procurement activities encourage fair work practices and
payment of the real living wage and delivery of community benefits relating to
employment and training. 
Climate Change and Carbon 
4.5 North Ayrshire Council’s procurement activities comply with the Procurement Reform
Act (Scotland) 2014 sustainable procurement duty. 
Key Priorities 
4.6   None. 
Community Wealth Building 
4.7    Procurement 
Local suppliers are identified and invited to quick quotes and supported through 
tendering and framework opportunities wherever possible. 
Employment 
Community Benefits for employment and training are requested within relevant
procurement exercises. 
As a Living Wage Accredited Employer, North Ayrshire Council strongly believes that
all employees should be paid the real living wage. North Ayrshire Council also
encourages all bidders to pay the real living wage and ask for information on their
payment practices. This will include the number of staff who are paid and those that
are not paid the living wage, with reasons for non-payment. The Corporate
Procurement Unit and The Fair Work Ayrshire Team will use this information to work
with suppliers to help them achieve payment of the living wage to all employees on
future contracts. 
Land and Assets – Not applicable 
Financial Power – Not applicable 
Democratic Ownership – Not applicable 
60

Page 61

5. Consultation 
5.1 Throughout all procurement exercises there is direct involvement with all relevant
Directorate teams. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Suzanne Quinn, Senior Manager (Corporate
Procurement), on 01294 324039. 
Background Papers
None 
61

Page 62

Appendix 1 – Top 20 Suppliers by Spend 
Supplier Name Aggregate Spend
VAN OORD UK LTD £32,987,405.36
HUB SOUTH WEST SCOTLAND LTD £26,046,001.49
PPP SERVICES (NORTH AYRSHIRE) £14,290,705.26
EDF ENERGY CUSTOMERS PLC £11,964,184.62
MARLEY CONTRACT SERVICES £10,334,730.70
CLARK CONTRACTS LTD £8,381,172.11
NORTH AYRSHIRE LEISURE LIMITED £6,073,133.90
JAMES FREW LTD £5,205,769.03
MCTEAR CONTRACTS LIMITED £4,612,532.07
HANSEL ALLIANCE £3,889,198.68
HAMILTON TARMAC £3,654,024.98
R J MCLEOD (CONTRACTORS) LTD £3,581,508.06
CORNERSTONE £3,516,933.16
MUIR CONSTRUCTION LIMITED £3,339,364.20
BUCKREDDAN LODGE NURSING HOME £3,054,878.32
KIBBLE EDUCATION & CARE CENTRE £2,905,127.34
KEY HOUSING ASSOCIATION LTD £2,749,032.75
HILLHOUSE QUARRY GROUP T/A MACASPHALT £2,738,905.09
TOTALENERGIES GAS & POWER LIMITED £2,646,595.05
THE RICHMOND FELLOWSHIP SCOTLAND £2,613,097.40
Total  £154,584,299.57 
62

Page 63

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet
Title: Brighter Pathways Re-modelling Care Options
Purpose: To provide an update to Cabinet on the work of the Brighter
Pathways transformation work which was to address:
1.  Current pressures on placement availability and
accommodation for leavers.
2. To shift the balance of care from high-cost external residential
resources to family-based care or internal residential
resources.
3. To build capacity and provide more local resources and
choice to young people who require to be looked after with
increased family-based care.
Recommendation: Cabinet are asked to note the progress and ongoing work of the
Brighter Pathways Programme. 
1. Executive Summary 
1.1 The Brighter Pathways transformation programme has been progressing since April
2024 with the establishment of a Programme Board which provides appropriate
governance and representation across a range of agencies and is supported by a
dedicated Programme Manager. The transformation and service developments are
being delivered through focused workstreams focusing on the following areas:
1. Housing and Throughcare
2. Fostering and Kinship
3. Education including Residential School Placements
4. Internal Children’s Houses – Model of Care
5. Early Intervention and Crisis/Intensive Support Pathways
6. Strategic Needs Assessment/Data/Workforce
7. Best Practice Models and Research
This report provides an update on progress since the last update to the Cabinet in May
2024. The workstreams are at various stages and position papers with
recommendations for areas of improvement and developments are being considered.
Agenda Item 7
63

Page 64

1.2 Positive progress has been made in focusing on the immediate opportunities to identify
alternative care options for children and young people in residential care and there has
been positive movement. The longer-term systemic changes required to our local care
system are being developed in parallel, updates on each of these areas are provided in
the report, noting that many of these remain as active areas of work with many expected
to bring forward proposals and outputs in March 2025.
1.3 The work of the Brighter Pathways Programme Board is closely aligned with The
Promise development plan and the work of the Corporate Parenting Steering Group
which is responsible for overseeing the six Corporate Parenting duties, ensuring that
each corporate parent upholds the rights and safeguards the wellbeing of Care
Experienced people. 
2. Background 
2.1 Children’s Placements
“Looked After Children” …at 18 per one thousand of the local 0 to 18 population, North
Ayrshire still has one of the highest national rates of looked after children and young
people, ranking fourth highest in Scotland. The national rate for children looked after is
12.3 per one thousand.
Over the last couple of years there have been notable decreases specifically in children
and young people being looked after at home, with friends/relatives, and with foster
carers. However, the number of formerly Looked After young people requesting to stay
in their placement under Continuing Care is increasing. In September 2024 there were
55 young people in these placements, which is one of highest rates in the country. This
will likely increase further as young people are choosing to remain in their care setting
longer and up until aged 21.
Overall, the number of Looked After Children has steadily reduced over the last few
years but the numbers in residential care have not followed the same trend, and the
number of requests for Continuing Care has increased significantly. This reflects the
decline in foster care provision and a reliance on residential care. Positively the number
of Kinship placements has increased over the same period. The graph below illustrates
the movement/trends from 2018 until September 2024. 
64

Page 65

2.2 External Residential Care/ Care & Education 
At present there is a significant overspend associated with Children’s Residential
Placements, both within the HSCP and Education. The overspend predominately
relates to costly external Residential Placements. 
There are currently 31 full time external placements. These placements are costly and
do not always deliver the best outcomes for children, young people, and their families.
The HSCP acknowledges that some children will always require more specialist
resources due to their needs and complexity, and in some situations an external
residential placement will be unavoidable. 
Proactive work is underway to identify those young people where there may be
opportunities to bring them back from External Residential Care. In September 2024,
the service identified 6 young people where it was deemed to be in their best interests
to leave their current external placement and either return to an internal children’s
residential placement, transition to independent living or to be rehabilitated back to the
care of a family member. As a result to date, 3 young people have moved on from
external placements, 2 more are planned to exit their residential placement by the end
of November 2024 and one young person is currently waiting the allocation of a tenancy. 
The charts below illustrate children in internal residential and those in external
residential care. These evidence the structured approach to categorising and ongoing
review of the support needs of young people in care and projected length of time they
require to be accommodated, which support future planning and to give an indication of
the scale of moves which may be possible. 
RED: Young people likely to remain in care until 21, either due to Permanence Orders or
requests for Continuing Care. 
AMBER: Young people with no significant changes to care plan, but efforts will continue to
support their return to family or independent or supported living. 
GREEN: Young people who have the potential to return home or transition to independent
living. 
65

Page 66

2.3 Throughcare and Housing Workstream 
The workstream acknowledged that significant improvements were necessary to
improve the process and joint working between social work and housing, to ensure
young people leaving care were allocated suitable and appropriate housing when they
were ready to leave their care setting. There have been situations where young people
in residential care were approaching 21 years of age and there was no allocation of
housing, or a transition plan, for these young people. 
To address these issues, social work and housing colleagues will revise the Housing
Protocol to include clear processes for care leavers in terms of housing allocation, and
an escalation process if there is a delay in young people receiving a housing offer.
Housing and Throughcare are having regular meetings to discuss young people’s
housing applications and track progress or delay. A draft version of a revised Housing
Protocol will be completed by February 2025. 
There have been developments and an update to the supported care scheme as an
alternative option for UASC and young people moving on from residential care, or an
alternative to residential care for young people over 16. It is hoped that the new
website and digital approaches to recruitment of carers will lead to more interest in
supported care for young people over 16, which could support some young people to
move on from residential care. The programme board and PSMT have also agreed
an increased allowance for supported carers. 
The workstream is also considering models of supported accommodation which
support young people over 16 to move on to independent living, with appropriate
support. This would provide a stepping stone for young people moving on from care
to equip and prepare them for independent living. There have been discussions with
providers and proposals for a commissioned service for six young people. This would
be targeted for young people from external and internal residential care. Options
continue to be explored and considered through the programme board. 
2.4 Foster Care 
Our aspiration is that children who require alternative care are best placed in family-
based care and we require several new foster carers to meet the current demand for
children of all ages. 
The biggest challenge facing the fostering sector today is the retention and recruitment
of high-quality foster carers who can meet the needs of children in care. A lack of
available foster carers, in the right place at the right time, means children are missing
out on vital support. Children in need of care are at risk of being moved away from
their communities, hobbies, siblings, having to change schools and leave behind what
is important to them, which has a detrimental impact on their wellbeing, stability and
development. 
The Fostering Service has lost 59 interim carers over the last two years, this is due to
resignations, de-registrations and change of role of carers. The service has a target
to recruit six new carers per year, however this has not been achieved over the last
five years. The service has only recruited two new interim foster carers this year and
there are no pending new approvals in 2024. The service has seen a significant
reduction in the number of enquiries from potential foster carers and is currently at the
lowest number for five years.
66

Page 67

Within the foster care workstream, recruitment of foster carers was a priority area that
required urgent attention. There have been consultations with the Council Advertising
Network, an organisation who specialise in supporting public bodies with digital
marketing campaigns. They have extensive experience and specialise in Foster Carer
recruitment campaigns, and digital user experience, and have expertise in this area.
The organisation currently delivers campaigns for 40 local authority fostering services
throughout the UK.
In Scotland, Fife Council have also recently begun collaborating with the Council
Advertising Network on digital advertising. They have had remarkable success in
increasing their number of enquiries (64 enquiries in first 3 months of 2024), however
we are, as yet, unsure of how many of these have been converted to approved foster
carers. 
There have been testimonies and information from other Local Authorities who have
worked with Council Adverting Network who have increased their enquiries and led to
an increase in the number of approved quality foster carers. 
This proposal would assist in the recruitment and approval of foster carers and would
potentially lead to cost savings if we increased fostering resources. This would also
prevent children being placed within high-cost external providers. Average annual
placement costs are:
• Internal fostering provision £23k.
• External fostering provision £60k.
• Internal residential provision £125k.
• External residential care £248k.
Evidence has shown that traditional advertising from Local Authorities most often
drives potential fosterer carers to internet search engines such as Google, where they
will look up fostering in North Ayrshire. Invariably, this leads them straight to the
independent agencies rather than our current website, and we miss out on potential
carers. 
At present, when Googling ‘Fostering North Ayrshire,’ the first three results returned
are for Barnardo’s, Foster Plus and FCA Scotland. This will vary at any given time,
however because the Independent Fostering Agencies (IFA) pay to ensure they are
high in the rankings, we will always appear behind at least some of them.
A digital advertising campaign employing the same techniques as the IFAs could help
us to counteract this problem and would put the service on an equal footing with
independent providers. 
The programme board and PSMT have approved the funding for the Council
Advertising Network to support foster care recruitment. This development will also
provide a separate webpage for the fostering service that will improve user experience
and journey, alongside targeted digital recruitment strategies that have proven to be
successful, with increased recruitment activity and conversions to approved quality
foster carers. 
67

Page 68

2.5 Revised Fostering Schemes 
To further address the recruitment and retention issues of foster carers in North
Ayrshire, work is ongoing to devise new fostering schemes which will replace the two
schemes that have been in place since 2011. There has been consultation and
feedback from current approved carers on the rewards and challenges of foster care
and any areas that would provide better support and prevent them considering leaving
fostering. The feedback from carers will be used to inform the new fostering schemes
in North Ayrshire. It is anticipated that the new fostering schemes will be implemented
in March 2025. 
2.6 Education including Residential School Placements 
This workstream is still in its preliminary stage and the next step will be to provide a
position paper and recommendations and actions for improvements. Education
colleagues and social work staff have been sharing information on supports to children
on the edge of care, or children who require additional support or specialist
educational resource and scoping out barriers and opportunities and how best we can
support children and families. The workstream has collated data to ensure any
recommendations are evidence and data driven. The initial discussions have focused
on improved joint working between social work and education and how we can fully
utilise internal resources to prevent children requiring external education and care
placements. 
2.7 Internal Children’s Houses – Model of Care 
This workstream will review the current model of care within internal residential houses
to inform any redesign or change to the delivery of high-quality residential care within
North Ayrshire. This workstream is also in the initial stages and a position paper will
be completed in March 2025 with recommendations. 
It is recognised that our internal houses are currently significantly challenged because
of high numbers of young people supported, with a current focus on moving on young
people where we can, we expect to stabilise the houses and thereafter have the
opportunity to assertively review the model of care. 
2.8 Early Intervention and Crisis/Intensive Support Pathways 
Within this workstream we have mapped out all of the services within North Ayrshire
from education, third sector and social services, to analyse any gaps and explore how
families become aware of services provided out-with the partnership. There is also
some caution regarding some services that have short term funding, and the impact
this will have on children and families who are supported by the services when the
funding ends. 
The focus of the group has been on early intervention and early help to prevent
children requiring support from the partnership and statutory services. There will also
be a focus on crisis and intensive support to children and families to sustain children
with their parents/carers and prevent children being accommodated, or their family-
based care placement disrupting. There has been benchmarking with other Local
Authorities to explore alternative models for crisis and intensive support to consider
new ways of working or change to current services.
68

Page 69

There will be a position paper and recommendations presented to the programme
board by March 2025. 
2.9 Strategic Needs Assessment/Data/Workforce 
Within the workstream there is ongoing collection of data from numerous sources,
Public Health, SCRA, Education and HSCP data analyst. A paper will be produced
by March 2025 with the current and future demographic and data to inform future
resources and staffing levels. The workstream will project and model likely future need
of care settings for children and young people. 
2.10 Best Practice Models and Research 
The focus of this workstream was on residential care and family-based care, data was
indicating that there was a high number of children in internal residential care and
external residential care, who had previously been in kinship care and internal foster
care provision. Furthermore, there was also a number of children in external
residential care who were previously cared for within internal children’s houses. The
workstreams focus is on how best we can support foster carers, kinship carers and
internal residential houses to better support children and young peoples with complex
needs and behaviours, with an objective to sustain their placement and provide better
outcomes and prevent escalation to external high-cost resource. 
To date the following areas have been progressed: 
• Psychological consultation and clinical support to one of the residential houses as
a pilot to support staff to manage specific children’s behaviours. This will be
evaluated and considered for other houses and for children in foster care.
• New referral process implemented for referrals to Rosemount (crisis/intensive
support service) for children in foster care whose placement is fragile and at risk
of disrupting. The new referral process was to address the following:
• Intervention and role clarification.
• Touch points, sharing of information, progress/difficulties.
• Mechanism to review and measure intervention.
• Prevent duplication of role.
• Less confusion for carers/clarity of different roles.
• Increased joint working. 
There is ongoing work within this workstream and a position paper with
recommendations will be produced by March 2025. 
3. Proposals 
3.1 For Cabinet members to be fully aware of the areas of progress and ongoing activity of
the Brighter Pathways transformation work. 
69

Page 70

3.2 Anticipated Outcomes 
• Scrutiny and oversight of all external residential placements
• To improve local resources and range of choices for young people leaving care.
• To improve long term outcomes for young people/ care leavers
• Review current service provision to ensure it meets current context, changing
landscape and demographic of young people and families.
• Support innovation in supporting children to remain in family-based care, with
parents, foster carers, or kinship carers.
• Review and analyse the effectiveness of the preventative, early intervention and
community-based supports for children, young people and families.
3.3 Measuring Impact 
The Project Board will be tracking the progress of work plans or developments within
the workstreams. 
There will be analysis of data and a needs analysis to project future demands for
supports and services and how services need to be delivered. This will be an ongoing
process that will review all young people within internal and external residential
resources and their pathway to a supported community-based alternative or
independent living.
4. Implications/Socio-economic Duty
Financial
4.1 The financial resources associated with Children’s Residential Placements are
substantial and represent a significant pressure on the Partnership’s available budget.
In 2024/25, the budget for external residential places amounts to £6.4m and it is
projected at Month 6 (September) that the year-end outturn will be in the region of
£8.5m. A non-recurring budget increase of £4m was agreed by the Cabinet for
2024/25 and it is currently planned to reduce this over the next 2 financial years as
the Brighter Pathways programme achieves success. The future years budget setting
process will require consideration of the appropriate budget aligned with the
assessment of possible moves for young people, financial modelling is being worked
through to inform this. 
It should also be noted that many of the external places are commissioned through
frameworks managed by Scotland Excel and that significant inflationary increases
have been agreed during 2024/25, well in excess of the budget provision which was
made to support the implementation of the Living Wage within Children’s services. It
is currently estimated that contract inflation has added £0.339m to the cost of these
places. External placements are costly and are not necessarily the best outcome for
all young people, Children’s Services as part of the Brighter Pathways work are clear
on our ambition to exhaust all other alternatives for children and young people with
future External Placements being the last resort or required because of specific
individual circumstances.
70

Page 71

As part of the programme of work there will be recommendations for short term
investment and future re-alignment of financial support in specific areas with a view to
longer term financial sustainability for the Cabinet. As noted, whilst financial outcomes
are not the main driver for the change programme which is focused on quality
outcomes for young people and families, there is an underlying overspend in external
residential placements which requires to be addressed. Recognising the work and
time required to make the changes, the Cabinet provided for an additional £4m of
resource as a budget pressure in 2024-25 to support this cost pressure, with an
expectation of this reducing over time. 
Human Resources 
4.2 Any possible impact on staff due to re-modelling or service redesign will be explored
fully in the workstreams and project board and affected staff, and Human Resources
will be consulted. 
Legal 
4.3 There is legislation and policy that govern looked after and care experienced children
and young people and the programme of work will adhere to the legislative frameworks
and relevant policies and regulations. 
Legal services will be consulted on any legal matters that arise throughout the
programme of work. 
Equality/Socio-economic 
4.4 The aspirations of the programme board are in line with the vision of The Promise to
address the inequality of outcomes experienced by our children and young people
who have been, or are in, the care system. If the ambitions of The Promise are
realised, not only will there be improved outcomes but also a reduction, and ideally,
an elimination of the inequity that exists between care experienced children and young
people and children and young people with no experience of care. 
Risk
4.5 The programme board has a risk log to identify any identified risks from each service
represented on the board.
When trying to project and plan resources for looked after children there is an element
of uncertainty as children who require alternative care are usually in a crisis situation
and their admission to care is unplanned with limited opportunity to plan and seek
appropriate resource. Trafficked young people are spontaneous arrivals and it is
unknown how many we will need to support in the near future.
The current care system we are operating with is under significant pressure with
capacity issues within foster care and residential care and limited options to support
care leavers.  The risk of not embarking on the programme of work and
71

Page 72

transformational change, could lead to increased costs of external provisions and
further overspend. 
Climate Change and Carbon 
4.6 None. 
Key Priorities 
4.7 The work of the Programme Board fully aligns and supports the work of: 
• The Promise – Plan 21-24.
• The United Nations Convention on the Rights of the Child (UNCRC).
• Kinship Care Strategy.
• Getting it Right for Every Child (GIRFEC).
• North Ayrshire Council’s Corporate Parenting Plan 2023-2026.
• Children’s Services Plan 2023 -26.
The proposal and recommendations support the spirit of The Children and Young People
(Scotland) Act 2014, which outlines the need for appropriate accommodation for young
people over 16 years of age, to support them to prepare for independent living. 
Community Wealth Building 
4.8 None. 
5. Consultation
5.1 Throughout the programme of work there will be ongoing consultation and collaboration
with service areas, national bodies, third sector colleagues and consultation and co-
production with service providers, young people, families, and carers, many of whom
are represented at the Project Board or through the Workstreams. 
Caroline Cameron
Director, Health and Social Care Partnership 
For further information please contact Elizabeth Stewart, Head of Service, Children,
Families and Justice on 01294 317727. 
Background Papers
0
72

Page 73

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet 
Title:    Integration Joint Board Financial Position 
Purpose:  To provide Cabinet with an update on the financial position
of the IJB. 
Recommendation:  That Cabinet notes the financial position of the IJB and the
action being taken to manage the overspend position. 
1. Executive Summary 
1.1   The IJB faces a significant financial challenge and is currently projecting a year-
end overspend position of £5.611m (as at Month 6). 
1.2 A financial recovery plan has been developed in line with the requirements of the
Integration Scheme and full delivery of this would improve the position to an
overspend of £2.905m (£2.462m Social Care and £0.443m Health). 
1.3 There remain further financial risks to the IJB driven by factors including in-year
reductions in funding and significant demand pressures on services.  The
financial challenges also have implication for the delivery of the Council’s social
work duties. 
2. Background 
2023/24 Final Outturn Position 
2.1 The North Ayrshire IJB reported a year-end overspend position of £7.464m
(2.4%) for financial year 2023/24. The overspend did not have a financial impact
on either North Ayrshire Council or NHS Ayrshire and Arran, as the IJB held
sufficient unearmarked financial reserves to absorb the full overspend. However,
this left the unearmarked reserve standing at only £0.357m moving into 2024/25. 
2.2 The main areas of pressure were residential placements for children, care at
home, use of supplementary staff across community wards, and unplanned
activities (UNPACS) within the lead partnership for mental health. These
underlying areas of overspend are recurring costs and therefore continued into
2024/25. 
2024/25 Revenue Budget
Agenda Item 8
73

Page 74

2.3 The IJB, like the Council, is required to set a balanced budget and met in March
2024 to formally agree the budget for 2024/25. Additional cost pressures of
£16.131m were identified and, with only additional funding of £5.841m for specific
Scottish Government priorities, savings of £10.290m were approved by the IJB
to achieve balance. Both the Council and the Health Board provided a flat cash
settlement.  The majority of the savings which were approved as part of the
2024/25 budget are on track to be delivered. 
2.4 The graphs in Appendix A illustrate the main spending areas of the IJB budget
for 2024/25. 
2024/25 Projected Outturn 
2.5 The finance team within the Health and Social Care Partnership carry out regular
budget monitoring in conjunction with Heads of Service and their Senior
Management Teams, and update reports are provided to the IJB on 6 occasions
during each financial year. 
2.6 The most recent report was based on information at Month 6 (September) for
social care expenditure and Month 4 information for health expenditure, and this
was presented to the IJB in November. The report noted a projected overspend
of £5.611m for the current financial year (Month 4 £6.697m overspend). 
2.7 Where a projected overspend is identified, the IJB is required to agree a financial
recovery plan. Initial actions were agreed by the IJB in June based on the
2023/24 outturn position, and further work has continued to develop the recovery
plan with additional actions agreed by the IJB. The full financial recovery plan is
part of the IJB financial report, which is attached at Appendix B. Full achievement
of the actions identified so far would reduce the projected overspend to £2.905m
(Month 4 £2.995m overspend). 
2.8 The cost reduction targets include: 
• A reduction in children’s residential placements
• A reduction in the number of older people’s care home placements
• Delaying approval of new care packages for adults 
• Reduced capacity in the Care at Home service
• Less usage of supplementary staff in community wards
• Additional vacancy turnover targets 
The recovery plan also reflects the use of the remaining unearmarked reserve
balance and a review of earmarked reserves which has released some funding
to support the in-year position. 
2.9 The IJB has not approved a Financial Recovery Plan which meets the full
projected overspend and there remains a significant risk of a year-end actual
overspend position.  It is challenging to identify short term opportunities to
improve the financial position against the performance expectations for services,
the increase in demand for social care supports across all client groups, the
74

Page 75

inflationary impact on the cost of care including pay and the majority of the
delegated budget being committed to front line care delivery, either through staff
costs or commissioned providers.  The IJB has limited discretionary spend areas
and limited scope to generate income or stop services.  These challenges are
alongside a significant number of financially high-risk areas including continued
uncertainty over funding, through late notification and in-year changes to Scottish
Government funding. 
2.10 The IJB agreed to the establishment of a Finance Working Group (FWG),
consisting of IJB members and senior officers, and chaired by the IJB Vice Chair.
This meets monthly with the main remit being: 
• Detailed scrutiny of in-year financial projections
• Monitoring the delivery of the financial recovery plan
• Monitoring the progress with delivery of the Transformation Plan
• Reviewing the 3-year Medium-Term Financial Outlook
• Detailed scrutiny of budget planning for the next financial year. 
The FWG is not a decision-making group and all decisions in relation to the
budget which require formal agreement will continue to be made by the IJB. 
2.11 The first 3 meetings have already taken place. The group has focussed on the
most significant areas of cost pressure and has so far undertaken deep dives
into the recovery plans in the following service areas: 
• Financial Risks
• Care at Home
• Brighter Pathways (Children’s Residential Placements)
• Older People’s Residential Care Services
• Financial Inclusion
• Charging income and opportunities 
2.12 Further meetings are scheduled to the end of the year and will include follow-up
work on some of the areas above, as well as further areas identified: 
• Medium Term Financial Outlook
• Complex Care including out of area placements
• Addictions Prescribing
• Supplementary Staffing 
2.13 Building on the work of the Finance Working Group, proposals are being
developed for agreement by the IJB, in advance of the budget setting in March,
which will generate future recurring savings. Examples include Financial
Inclusion services and the setting of fees and charges. 
2.14 Other management actions which have been implemented include: 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
75

Page 76

governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze has been implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working. 
2.15 Any remaining overspend will have a financial impact on the Council and NHS
Ayrshire and Arran. The Integration Scheme sets out at paragraph 8.2.1 that: 
“The Chief Officer will deliver the Outcomes within the total delegated resources
(paid and Set Aside) and where there is a forecast overspend against an element
of the operational budget, the Chief Officer, the Chief Finance Officer of the
Integration Joint Board and the appropriate finance officers of the Parties must
agree a recovery plan to balance the overspending budget, which recovery plan
shall be subject to the approval of the Integration Joint Board. If the recovery plan
is not successful the Parties will consider making interim funds available based
on the agreed percentage contribution for joint responsibilities, as outlined above,
with repayment in future years on the basis of a revised recovery plan agreed by
the Parties and Integration Joint Board. If the revised plan cannot be agreed by
the Parties or is not approved by the Integration Joint Board, the dispute
resolution mechanism in clause 14 hereof, will be followed.” 
2.16 There are a number of ongoing risks to the financial position of the IJB; these
include but are not limited to: 
• The recent announcements by Scottish Government in relation to public sector
finances and in-year spending reductions will impact on current and future
funding.
• Uncertainty around the level of funding for 2024-25 pay awards, which have
very recently been settled for local government and NHS.
• The significant financial challenge within NHS Ayrshire and Arran and an
expectation that IJBs will support this through the transfer of risk around
primary care prescribing overspends and by contributing to the cost of delayed
discharges from the acute hospitals.
• Continued growing demand for services
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement.
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages, where any additional packages happen on an unplanned basis and
would have a significant financial cost.
2.17 Integration Joint Boards across the country are reporting similar financial
challenges, with many having exhausted their unearmarked reserves during
2023/24, and the majority having financial recovery plans in place for 2024/25 to
76

Page 77

address a projected overspend position. This situation is driven by the well-
documented increases in demand for health and social care services, the high
levels of cost inflation in recent years and a lack of investment in additional
capacity over a number of years. 
2025-26 and beyond 
2.18 Work is underway in relation to the development of the 2025/26 budget, which
will be agreed by IJB in March 2025, and to refresh the 3-year Medium-term
Financial Outlook for the period 2025-2028. 
2.19 The most recent MTFO, which was reported to IJB earlier in 2024, noted that
there is likely to be a significant budget shortfall which will required to be
addressed in each financial year: 
2.20 The IJB has agreed a Transformation Plan which will contribute to meeting the
financial deficit. This is attached at Appendix C for information. 
Social Work Duties 
2.21 The Chief Social Work Officer presented a report to the IJB in November to
outline the context around Social Work Duties, Available Resource and Ethical
Considerations.   Social Work encompasses a diverse range of services. In
Scotland, local authority Social Work departments or Health and Social Care
Partnerships deliver these services with the aim of supporting some of the most
vulnerable people in society and improving the quality of their lives. Most Social
Work and social care resources are directed towards adult services, mostly on
care services for older people (65 years+). Social Work services also provide
services to children and young people to help support and protect vulnerable
children and their families. Criminal justice Social Work involves a range of
services to the criminal justice system. In North Ayrshire all social work services
are delivered via the Health and Social Care Partnership. 
2.22 The cross-cutting nature of Social Work means that it is regulated by a complex
and constantly evolving statutory framework. The 1968 Social Work (Scotland)
Act recognises the central role of the local authority in determining where there
is a need for the provision of community care services and how such need should
be met. The legislation, as amended in 1990, describes assessment as a two-
stage process: first the assessment of needs and then, having regard to the
results of that assessment, the local authority shall decide whether the needs of
that person call for the provision of services, services can only be provided where
the resources are available to do so.
77

Page 78

2.23 The use of eligibility criteria applies to the second part of the assessment
process. National eligibility criteria for social care were agreed by the Scottish
Government and COSLA in 2009 and the criteria were explicitly designed to
apply consistently across all adult care groups. NAHSCP has a locally agreed
eligibility criteria that it uses, set by the IJB which defines service access at the
substantial or critical level only. These are defined as follows: 
• Critical Risk: Indicates that there are major risks to an individual’s
independent living or health and well-being and likely to call for the immediate
or imminent provision of social care services.
• Substantial Risk: Indicates that there are significant risks to an individual’s
independence or health and wellbeing and likely to call for the immediate or
imminent provision of social care services. 
2.24 Since the adoption of substantial and critical assessed need as the threshold for
accessing services in North Ayrshire there have been a number of significant
changes in relation to the operating context and the financial context along with
the emergence of a more progressive approach to service design and delivery
based around people and place. 
2.25 There has been considerable demographic change with an ageing local
population, greater numbers of people living with multiple long-term conditions,
increasing numbers of children with an identified disability along with an
increased complexity of need across all age groups. This is further exacerbated
by the broader societal impact of austerity, Covid and the broader effects of
poverty which has compounded the range of difficulties society is facing. 
2.26 Alongside this social context available resources have also become more
constrained with demand far outstripping both financial and human capacity.
Managing infinite human need within finite resources has always been part and
parcel of balancing Social Work demand and capacity. Financial settlements
have resulted in significant pressures on budgets, both as a result of the changes
noted above and inflationary pressures and has resulted in residents waiting for
access to services. 
2.27 Projected figures show no signs of the health and social care system being in a
place to resource itself to meet society’s needs, and within the North Ayrshire
context it is not impossible to imagine a time in the near future, where like others,
we find ourselves in a position where we will not be able to meet our statutory
duties. 
Accounts Commission report 
2.28 A recently published Accounts Commission report, ‘Integration Joint Boards
Finance and Performance’, provides a useful summary of the position. It notes
the highly challenging landscape faced by IJBs in delivering community health
and social care services, including increasing demand for support, insufficient
funding, recruitment and retention challenges across the workforce and the
uncertainty caused by the plans for a National Care Service. Although the report
78

Page 79

presents the national position, most of the challenges highlighted clearly reflect
the position in North Ayrshire and the key points are noted in the following
paragraphs. 
2.29 The report notes that Integration Joint Boards (IJBs) face a complex landscape
of unprecedented pressures, challenges and uncertainties. These are not easy
to resolve and are worsening, despite a driven and committed workforce. The
health inequality gap is widening, there is an increased demand for services and
a growing level of unmet and more complex needs. There is also variability in
how much choice and control people who use services feel they have, deepening
challenges in sustaining the workforce, alongside increasing funding pressures. 
2.30 The Accounts Commission report that there isn’t significant evidence of the shift
in the balance of care from hospitals to the community intended by the creation
of IJBs. IJBs operate within complex governance systems that can make
planning and decision making difficult. They cannot address the issues across
the sector alone. Whole system collaborative working is needed as part of a clear
national strategy for health and social care that will promote improved outcomes
across Scotland but reflects the need to respond to local priorities. 
2.31 The workforce is under immense pressure reflecting the wider pressures in the
health and social care system. Across the community health and social care
sector there are difficulties in recruiting and retaining a skilled workforce. The
Covid-19 pandemic, the cost-of-living crisis, and the impact of the withdrawal
from the European Union have deepened existing pressures. Unpaid carers are
increasingly relied on as part of the system but are also disproportionately
affected by the increased cost-of-living. Without significant changes in how
services are provided and organised, these issues will get worse as demand
continues to increase and the workforce pool continues to contract. 
2.32 Uncertainty around the direction of the plans for a National Care Service and
continued instability of leadership in IJBs across the country have also
contributed to the difficult context for planning and delivering effective services.
There are many examples of IJBs trying to work in new and different ways, but
there is a lack of collaboration and systematic shared learning on improvement
activities. 
2.33 The financial outlook for IJBs continues to weaken with indications of more
challenging times ahead: 
• In common with other public sector bodies, financial pressures arising from
rising inflation, pay uplifts and Covid-19 legacy costs are making it difficult to
sustain services at their current level and, collaborative, preventative and person-
centred working is shrinking at a time when it is most needed. 
• The financial outlook makes it more important than ever that the budget process
involves clear and open conversations with IJB partners, workforce, people who
use services and other stakeholders around the difficult choices required to
achieve financial sustainability. 
79

Page 80

• Overall funding to IJBs in 2022/23 decreased by nine per cent in real terms or
by one per cent in real terms once Covid-19 funding is excluded. The total
reserves held by IJBs almost halved in 2022/23, largely due to the use and return
of Covid-related reserves. The majority of IJBs reported notable savings, but
these were largely arising on a non-recurring basis from unfilled vacancies. 
• IJBs have had to achieve savings as part of their partner funding allocations for
several years. The projected funding gap for 2023/24 has almost tripled, in
comparison to the previous year, with over a third anticipated to be bridged by
non-recurring savings, with a quarter of the gap bridged using reserves. This is
not a sustainable approach to balancing budgets. 
3. Proposals 
3.1    It is proposed that Cabinet notes the financial position of the IJB, the work being
undertaken to improve the in-year position and the ongoing risks. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There is a financial risk to the Council if the IJB remains in an overspend position
at the end of the financial year. 
Human Resources 
4.2 None. 
Legal 
4.3 The preparation of a Financial Recovery Plan by the IJB complies with the
requirements of the Integration Scheme. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 None. 
Community Wealth Building 
4.7 None.
80

Page 81

5. Consultation 
5.1  No consultation has been required in the preparation of this report. 
Caroline Cameron
Director (Health and Social Care) 
For further information please contact Caroline Cameron, Director (Health and
Social Care), on carolinecameron@north-ayrshire.gov.uk. 
Background Papers 
None.
81

Page 82

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (1)
82

Page 83

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (2)
83

Page 84

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (3)
84

Page 85

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (4)
85

Page 86

Integration Joint Board
14th November 2024
Subject : 2024-25 – Month 6 Financial Performance 
Purpose : To provide an overview of the IJB’s financial performance as at
Month 6 (September). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2024-25 and the current overall projected year-
end overspend of £5.611m, reduced to £2.905m through already
identified financial recovery actions;
(b) notes the progress with delivery of agreed savings;
(c) approves the actions which are being taken to progress
financial recovery and that a further recovery plan will be
presented to the next IJB;
(d) notes the remaining financial risks for 2024-25; and
(e) approves the budget reductions which are detailed at
paragraph 2.10 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
MDT Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework
MDT Multi-Disciplinary Team 
86

Page 87

1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of September further work is undertaken following
the month end to finalise projections, therefore the projected outturn position is as
current and up to date as can practicably be reported. 
It should also be highlighted that the NHS Ayrshire and Arran finance department
have not been able to provide updated financial projections for month 6 and the
position for Health delivered services reflects the month 4 position.  There is a risk
therefore of movement in the projections from Health for month 7, noting that with
restrictions on spend in place this may be a welcomed favourable movement. 
1.2  The projected outturn is a year-end overspend of £5.611m (1.7%) for 2024-25,
reduced to £2.905m through already identified financial recovery actions.    There is
an increasing risk to achieving financial balance during 2024-25, the projected
outturn position is summarised below with the residual risk following already
identified financial improvement actions: 
Split 
TOTAL Health/
NHS AA
Social
Care/NAC
Projected Overspend @ mth6 £5.611m £0.812m £4.799m
Less Financial Recovery Plan Projections £2.706m £0.369m £2.337m
Residual Risk £2.905m £0.443m £2.462m 
1.3  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
1.4 The main movements in the overall projected position and recovery plan are
summarised below: 
Improvement:
• Payroll turnover – social care £1.336m
• Care at home £0.562m
• LD care packages £0.126m
• Integrated Island Services £0.214m 
Deterioration:
• Children’s residential places (inflationary increases) £0.486m 
87

Page 88

• Care Home places (inc interim places) £0.513m (including £0.156m in relation
to the increase in the National Care Home Contract rate for the Agenda for
Change pay award). 
1.5 The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds.  NHS Ayrshire and Arran and North Ayrshire Council are not in a financial
position to make interim funds readily available, therefore it is imperative that the IJB
continues to support the process of development of the Financial Recovery Plan and
the actions required to work towards financial balance by the year-end. 
1.6 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The overspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism.  There is a requirement for the 3 IJBs to be
aware of the position for Lead Partnership services and plans to deliver services from
within allocated budget, on that basis further information will be brought forward with
further detail on Lead Partnership services. 
1.7 The 2024/25 financial position is being adversely impacted by several factors outwith
the control of the IJB. 
• Formal confirmation by The Scottish Government of the 2024/25 funding for
the Mental Health Outcome bundle saw a 3.5% reduction from 2023/24 which
equates to £0.350m and the service are currently working through the
implications of this reduction. It is expected that this can be managed within
the carry forward reserves from 2023/24 so there is no impact on 2024/25 but
the service is exploring the implications of bringing spend within budget in
2025/26. 
• Children’s residential placement contract inflation – Scotland Excel negotiate
rates for several national framework contracts and the rates agreed to date
are significantly higher than the 5.94% increase assumed as part of the
Scottish Living Wage increase. Rates which are agreed to date are included
in the projection and those still to be agreed are assumed to have an increase
based on the average of rates agreed to date.  Overall, the estimated impact
is an increase to the projection of £0.486m. 
Local Government Pay Award Shortfall – the additional cost of the 2024/25
local government pay award is estimated to be £0.900m.  It is unknown at this
stage of this will be fully funded and the potential cost is not included in the
month 6 projected outturn. 
88

Page 89

2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 6 
At month 6 against the full-year budget of £321.135m there is a projected year-end
overspend of £5.611m (1.7%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £4.799m in social care services and a projected
overspend of £0.812m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
Appendix F provides information on the costs of bank and agency staff as requested
at the August IJB. 
2.3 Health and Community Care Services 
Against the full-year budget of £89.939m there is a projected overspend of £6.143m
(6.8%) (£0.094m adverse movement) and the main variances are: 
a) Care home placements - the budgeted number of permanent placements was
765 and at month 6 there were 793 placements. The projected overspend is
£1.072m (£0.458m adverse) on permanent placements (including £0.156m in
relation to increased NCHC rates to reflect the recently agreed nursing pay
award), £0.208m (£0.208m adverse) on interim placements and respite
placements are projected to be online (no change). The plan to manage down the
number of permanent placements to reach the target is challenging due to the
need to minimise delayed discharge from hospital and to continue to support
those in critical and substantial need in the community. 
Income recovered from charging orders is projected to be £0.703m over
recovered (£0.153m favourable movement). This income is challenging to predict
as it depends on the length of the legal process and time taken to sell the property
that the charging order is registered to. 
89

Page 90

b) Care at home is projected to be £2.672m overspent (£0.582m favourable
movement). The position reflects the cost of meeting the significant demand and
level of provision for care at home support.  The favourable movement is due to
the impact of the care at home recovery plan including the holding of vacancies
and improved sickness absence rates.  Earlier in the financial year it was more
difficult to accurately project the cost of the in-house service due to the phased
move of services in-house, more recent months provide a settled financial
baseline from which more accurate projections can be estimated, providing
greater confidence in the projected outturn position. 
c) Physical Disability Services – projected overspend of £0.790m (£0.108m
adverse) split as follows: £1.116m over in residential placements, £0.050m over
in direct payments and £0.376m under in community care packages. 
d) Integrated Island Services is projected to overspend by £0.539m (£0.214m
favourable movement).  The most significant variance is a projected overspend
at Montrose House of £0.422m (£0.136m favourable movement) which relates to
the net overspend on agency staff (i.e. net of underspend on employee costs). A
new contract to procure agency nursing staff commences in November which will
reduce the hourly costs moving forward and this is reflected in the projection. 
e) Specialist Rehab wards – projected overspend of £0.126m (no movement)
(Redburn ward £0.152m overspend and Douglas Grant £0.026m underspend). 
The overspend is due to cover costs for vacancies as well as supplementary
staffing for patients who require one to one support. 
f) Wards 1 and 2 – Projected overspend of £0.762m (no movement) due to use of
supplementary staffing. 
2.4 Mental Health Services 
Against the full-year budget of £107.398m there is a projected overspend of £0.968m
(0.9%) (favourable movement of £0.101m) prior to the re-allocation of the Lead
Partnership variance to East and South HSCP.  The main variances are: 
• Learning Disabilities are projected to overspend by £0.788m (£0.126m
favourable movement) across community care packages, direct payments
and residential placements.  This improvement reflects the positive impact of
assertive reviews of care packages. 
• Community Mental Health services are projected to underspend by £0.380m
(£0.031m favourable) across community care packages, direct payments and
residential placements. The main reason for underspend is the availability and
capacity of adult community providers to deliver new packages of care. 
90

Page 91

• There is a projected underspend of £0.106m (no movement) in relation to the
cost of Hospital Based Complex Continuing Care (HBCCC), this reflects the
impact of change in provision for these services. 
• The Lead Partnership for Mental Health is projected to be £0.658m overspent
(no movement) and the main variances are as follows:
• Adult Inpatients – overspent by £0.442m due to overspends in
supplementary staff for enhanced observations (1:1 and 2:1) and use
of bank staff. 
• The UNPACS (Unplanned Activities) budget – projected overspend is
£0.679m based on current placements and an allowance for one further
placement. The actual cost of the future placements may be different
from the estimated cost assumed in the projection.  These placements
are for individuals with very specific needs that require a higher level of
security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women,
people with a learning disability or people with neurodevelopmental
disorder. This can necessitate an UNPACs placement with a specialist
provider which can be out-of-area.  The nature of mental health
UNPACs spend is that it is almost exclusively on medium or long term
complex secure residential placements which are very expensive so a
small change in placements can have a high budgetary impact. Due to
the complexity and risk involved, transitions between units or levels of
security can take many months. Applications to approve a placement
are made to the Associate Medical Director for Mental Health who
needs to be satisfied that the placement is appropriate and unavoidable
prior to this being agreed. A new group has been established to review
the UnPACS budget and placements with a wider service
representation. 
• Learning Disability Services – projected to underspend by £0.538m.
This position is after recharging other areas on a cost basis for two
outwith authority placements which have incurred additional costs in
relation to usage of supplementary staffing due to sustained enhanced
observations. There is a risk in relation to recovering this income as the
two areas receiving the charges are currently refusing to pay and legal
advice is being sought. 
• Elderly Inpatients – projected overspend of £0.415m due to the use of
supplementary staffing.  The elderly mental health wards continue to
operate at full occupancy and at times with waiting lists, with several
patients who are on enhanced observations and bank costs remain
high. 
91

Page 92

• MH Pharmacy – is projected to overspend by £0.585m due to
increased demand and cost of medicines. 
▪ Innovation Fund – projected underspend of £0.112m due to slippage
within some of the projects and not all of the funding has been
allocated. 
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £0.819m in
2024-25.  Further information is included in the table below: 
Vacancy Savings Target (£1.116m)
Projected to March 2025 £1.935m
Over/(Under) Achievement £0.819m
2.5 Children and Justice Services 
Against the full-year budget of £43.839m there is a projected overspend of £1.688m
(3.85%) (£0.554m adverse movement) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£2.051m (£0.682m adverse movement). The main areas within this are noted
below: 
• Following budget investment of £4m the children’s residential placements are
overspent by £1.898m (£0.359m adverse movement) based on 31
placements at month 6. This demonstrates a reduction of 6 places since the
start of the financial year. There are a number of factors leading to this
challenging position: 
• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking
Children (UASC) under the National Transfer Scheme and to support
trafficked young people who have been identified in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases
is shared 50/50 with Education services. 
92

Page 93

• Contractual inflation has increased the projected costs of residential
places by £0.339m which is outwith the control of the service. 
Children’s Services are continuing to work with other services including Education
and Housing to address the challenges through the work of the ‘Brighter Pathways’
Programme Board and associated workstreams. This forms part of the
Transformation Plan which was approved at the March IJB and an update on this
programme of work is included separately on the agenda. 
.
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.761m underspent (£0.033m adverse movement). 
• Children with disabilities – there is a net projected overspend of £0.582m
(£0.326m adverse movement) across residential placements, direct
payments and community packages. The adverse movement is largely linked
to inflation (£0.147m) and increased package costs (£0.101m) where
estimated costs were used in previous periods. 
• Residential respite – placements are overspent by £0.135m (£0.077m
adverse movement). These short-term placements are used to prevent an
admission to full time care or to avoid placement breakdown. 
• Employee costs – are projected to overspend by £0.172m (adverse
movement of £0.044m), largely due to staffing levels in the children’s houses. 
b) Head of Service – is projected to underspend by £0.675m (£0.151m favourable
movement). This consists of a projected overspend due to the planned saving of
£0.233m in relation to the staff reconfiguration in the children’s houses which was
not achieved in 23-24 and this is offset by the grant funding in relation to
Unaccompanied Asylum-Seeking Children, which is projected to amount to
£0.964m (£0.145m favourable movement) and which contributes to costs incurred
across a number of C&F service areas.   
c) C&F Health Team – is projected to overspend by £0.246m (no movement) mainly
in relation to the Band 6 to 7 regrade for Health Visitors and the progression of
posts up the Band 7 scale. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
This is projected to be on-line. 
93

Page 94

2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £2.787m
(£1.494m favourable) and the main areas of underspend are: 
• There is projected slippage on the LD and MH transition funding of £0.786m
(£0.186m favourable) due to delays in children transitioning into adult services
and actual costs being less than estimated.  This involves complex planning
by services with service users and families and can change over time based
on assessed need when moving into adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   The net impact is neutral, but Appendix A shows this position
for each element.
• An over-recovery of payroll turnover of £1.836m (£1.336m favourable) for
social care services and an over-recovery of payroll turnover of £0.296m (no
movement) for health services as outlined in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (3.301m) (1.522m)
Projected to be achieved by
March 2025
5.137m 1.818m
Over/(Under) Achievement 1.836m 0.296m 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. This has led to a significant increase in the level of turnover
when projected to the year end.  The Health element of vacancy savings will be
updated in month 7. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed separately within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2024-25 budget included £10.290m of savings. 
BRAG Status Position at
Budget Approval
Position at
Month 6
94

Page 95

£m £m
Red - 0.111
Amber 0.523 0.475
Green 9.767 -
Blue - 9.704
TOTAL 10.290 10.290   
b) The main area to note is that the red savings have increased since month 4
as the saving in relation to Montrose House looks unlikely to be achieved. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount (£000)
1 ICT Budget transfers (5)
2 Transfer to FM services re cleaning post at West Road (10) 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis. 
The outturn in relation to North Lead Partnership services is not fully attributed to the
North IJB as a share is allocated to East and South Partnerships; similarly, the impact
of the outturn on East and South led services is shared with North. At Month 6 the
MH lead partnership is projected to overspend by £0.658m (£0.215m NRAC share
for East and £0.188m for South). 
South HSCP – projected overspend of £0.581m of which £0.215m will be allocated
to North. The variance is mainly due to an overspend of £0.512m in the community
store.  This includes the costs of replacing mattresses, repairs and maintenance
95

Page 96

contract and equipment costs. There is also a projected overspend of £0.074m in the
continence service and an underspend £0.006m in the Family Nurse Partnership 
East HSCP - projected underspend of £0.360m in total (of which £0.133m will be
allocated to North). The main variances are: 
Allied Health Professions (Lead Partnership)
There is a projected underspend of £0.302m (£0.431m at month 4) on AHP services
hosted by East Ayrshire for the current year, which mainly relates to staffing savings
in Physiotherapy / MSK and Podiatry services and is partially offset by increased
Orthotics costs. 
Primary Care and Out of Hours Services (Lead Partnership)
There is a small projected underspend of £0.064m (£0.023m projected overspend at
month 4) on the Primary Care Lead Partnership budget, with additional costs in Out
of Hours services £0.321m (£0.371m at month 4), with work ongoing to mitigate
increased costs as far as possible over the course of the 2024/25 financial year and
going forward, as well as additional Primary Care contracting and support costs
£0.027m (£0.024m at month 4). These additional costs are offset by a projected
underspend in Dental services totalling £0.344m (£0.219m at month 4), where
staffing numbers are running at less than establishment. Recruitment over the
remainder of the financial year has the potential to impact further on the projected
outturn position at month 6. In addition, there is a small saving on Primary Medical
Services costs £0.058m (£0.152m at month 4). 
Prison and Police Healthcare (Lead Partnership)
The £0.101m (£0.043m at month 4) projected underspend at month 6 is largely due
reduced staffing costs. 
Other Services (Lead Partnership)
The £0.106m (£0.243m at month 4) projected overspend is due to increased Area
Wide Evening Services costs, mainly due to additional staffing costs including high
use of bank staff, which will require to be further addressed going forward. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.  
1.          Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how this compares to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive.  
96

Page 97

The 2023/24 usage is now available as is Q1 of 2024/25 and these has
been presented to Ayrshire Finance Leads for validation. The HSCPs require to
agree their final share of the baseline with each other, however the aggregate will
remain unchanged.  
IJB
Baseline at
2022/23
prices (£)
East 26,215,888
North 35,007,962
South 28,371,789
Total 89,595,639 
The annual budget for Acute Services is £435.0m.  The directorate overspent by
£16.8m after 6 months. This was caused by overspends on agency medical and
nursing staff, together with drug expenditure including the New Medicines Fund,
equipment and supplies. These have been required due to the level of operational
pressure being experienced, in common with many other areas in Scotland.
164 additional unfunded beds remained open across both main hospital sites during
September. 
There is a material underlying deficit caused by:  
• Unachieved efficiency savings
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and
Arran acute hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. Initial work has commenced to develop a joint strategic
commissioning plan for the provision of unscheduled care services, which will outline
these services will be delivered over the medium-term using the set aside resources
available. This will support a shift in the balance of care into the community and
support a reduction in the number of acute beds. 
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position. 
• The recent announcements by Scottish Government in relation to public
sector finances and in-year spending reductions will impact on current and
97

Page 98

future funding, including for 2024-25 pay awards, which have recently been
settled for local government and NHS but the funding position is not yet clear.
• Continued growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The provider market and the ongoing ability to source packages of care for
service users.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• The ongoing review of the Integration Scheme.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• The wider system financial challenges, especially the financial position of
NHS Ayrshire and Arran Health Board, their financial deficit and the risks
around further escalation in the national framework for financial escalation. 
North Ayrshire IJB have already discussed our position in relation to the
request for payment for delayed discharges last financial year.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The IJB free general fund reserves are estimated to be fully used during this
financial year, leading to an increased risk of requiring additional in-year
financial contributions from NHS Ayrshire and Arran and North Ayrshire
Council to break even. 
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The use of supplementary staffing for enhanced observations across a
number of service areas.
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. Non-
recurring funding has been provided to meet costs associated with this but it
is unclear whether this will be sufficient.
• Scot Excel inflationary increases for children’s service are significantly higher
than assumed. 
These risks will continue to be monitored during 2024-25. 
98

Page 99

2.13 RESERVES 
The IJB reserves position is summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2024 0.357  3.379 1.774 5.510
Anticipated Drawdown (0.357)  (3.379) (1.202) (4.938)
Balance – 31 March 2025 -  - 0.572 0.572 
The £1.774m HSCP earmarked reserve relates to the Service Redesign and Change
Fund; of this total only £0.096m currently remains uncommitted with the balance
being committed to investment in an early intervention approach within Children and
Families social work and supporting the delivery of the transformation programme
across 2024-25 and 2025-26. 
Further detail on the reserves is given in Appendix D. 
2.14 Financial Recovery Plan 
The IJB set a balanced budget for 2024/25 on 14th March 2024. This did not require
any draw on reserves but did include the approval of £10.290m of savings to achieve
financial balance. 
Following the finalisation of the 2023/24 outturn position, the IJB agreed some initial
recovery actions at the meeting in June. In line with the requirements of the
integration scheme, work has continued to develop the financial recovery plan and
identify further targets for financial improvements. The current plan is outlined in full
at Appendix E. 
There has been progress towards some of the targets, and these are already
reflected in the current projected outturn of £5.611m overspend. Further work is
required to deliver on the balance of these targets as well as the additional targets
which have now been identified. 
Services will work towards implementing the recovery plan to deliver on these cost
reduction targets while carefully managing the level of risk. This will include the
preparation of equality impact assessments. 
It is recognised that there needs to be further savings identified to move towards a
breakeven position. Any decisions to implement changes which have significant
impact on service delivery and the wider system will be discussed at the Finance
99

Page 100

Working Group before being brought back to the IJB for further approval as part of
the financial recovery plan. 
MANAGEMENT ACTIONS/CONTROLS: 
Other management actions which have been implemented include: 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working.
• Ongoing review of future year savings or transformation programmes to
identify scope for acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund
(ILF) Scotland. 
GOVERNANCE: 
• In order to facilitate greater scrutiny of the financial position and the delivery
of the financial recovery plan during 2024/25, the IJB agreed at the June
meeting to establish a ‘Finance Working Group’, chaired by the IJB Vice Chair.
The Director and Heads of Service will be members of the group. This will
meet monthly to facilitate increased oversight and scrutiny of the financial
position and transformation programme as well as detailed budget planning
for future financial years. Meetings have now been scheduled to the end of
the year.  
To date the Finance Working Group has met three times and covered care at
home, care homes, charging income, financial inclusion, an overview of the
budget and the Brighter Pathways project. The next meeting will review
Complex Care, Addictions Prescribing and an update to the Medium-Term
Financial Outlook. 
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams, including
line by line reviews of all budget areas.  Review and enhancement of
frequency and level of financial information provided to support oversight and
decision making in line with financial constraints, with an added focus on areas
100

Page 101

of underspend to maximise opportunities to delay or stop spend and contribute
to the overall financial challenge. 
INTEGRATION SCHEME 
The Integration Scheme describes the required approach where there is a projected
overspend: 
The Chief Officer will deliver the Outcomes within the total delegated resources (paid
and Set Aside) and where there is a forecast overspend against an element of the
operational budget, the Chief Officer, the Chief Finance Officer of the Integration
Joint Board and the appropriate finance officers of the Parties must agree a recovery
plan to balance the overspending budget, which recovery plan shall be subject to the
approval of the Integration Joint Board. If the recovery plan is not successful the
Parties will consider making interim funds available based on the agreed percentage 
contribution for joint responsibilities, as outlined above, with repayment in future
years on the basis of a revised recovery plan agreed by the Parties and Integration
Joint Board. 
There is an increasing risk to achieving financial balance during 2024-25, the
projected outturn position is summarised below with the residual risk following
already identified financial improvement actions and illustrates the current estimated
risk exposure to the IJBs funding partners: 
Split 
TOTAL Health/NHS
AA
Social
Care/NAC
Projected Overspend @ mth6 £5.611m £0.812m £4.799m
Less Financial Recovery Plan Projections £2.706m £0.369m £2.337m
Residual Risk £2.905m £0.443m £2.462m 
3.  PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2024-25 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2024-
25. 
101

Page 102

4. IMPLICATIONS  
4.1 Financial
The outturn is an overall year-end overspend of £5.611m (1.7%). The report outlines
the main variances for individual services.  There IJBs unearmarked reserve balance
is projected to be zero by the end of the financial year and there is an ongoing risk in
relation to the £2.905m of the overspend where financial recovery improvement
actions require to be identified.  This current position poses a financial risk to North
Ayrshire Council and NHS Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
The ‘financial viability of the HSCP’ risk on our strategic risk register has increased
the risk score to reflect the 23/24 outturn and current projected 24/25 overspend. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2024-25 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout
2024-25. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION 
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team.
102

Page 103

5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director 
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]- 
103

Page 104

PUBLIC INFORMATION
2024-25 Budget Monitoring Report–Objective Summary as at 30th September 2024                                                                 Appendix A       
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 71,123 76,174 5,051 18,816 19,908 1,092 89,939 96,082 6,143 6,049 94
: Locality Services 30,440 31,937 1,497 5,366 5,410 44 35,806 37,347 1,541 879 662
: Community Care Service Delivery 36,664 39,469 2,805 0 36,664 39,469 2,805 3,476 (671)
: Rehabilitation and Reablement 2,063 2,390 327 0 2,063 2,390 327 17 310
: Long Term Conditions 917 934 17 9,459 10,373 914 10,376 11,307 931 924 7
: Community Link Workers 338 338 0 0 0 0 338 338 0 0 0
: Integrated Island Services 701 1,106 405 3,991 4,125 134 4,692 5,231 539 753 (214)
MENTAL HEALTH SERVICES 34,206 34,624 418 73,192 73,742 550 107,398 108,366 968 1,069 (101)
: Learning Disabilities 25,694 26,482 788 556 555 (1) 26,250 27,037 787 916 (129)
: Community Mental Health 6,485 6,105 (380) 1,739 1,738 (1) 8,224 7,843 (381) (411) 30
: Addictions 2,027 2,037 10 1,899 1,899 0 3,926 3,936 10 12 (2)
: HBCCC 0 0 0 353 247 (106) 353 247 (106) (106) 0
: Lead Partnership Mental Health NHS Area Wide 0 0 0 68,645 69,303 658 68,645 69,303 658 658 0
CHILDREN & JUSTICE SERVICES 38,924 40,366 1,442 4,915 5,161 246 43,839 45,527 1,688 1,134 554
: Irvine, Kilwinning and Three Towns 3,021 3,075 54 0 0 0 3,021 3,075 54 32 22
: Garnock Valley, North Coast and Arran 3,123 3,154 31 0 0 0 3,123 3,154 31 43 (12)
:Intervention Services 1,700 1,704 4 0 0 0 1,700 1,704 4 (1) 5
: Care Experienced Children & Young people 27,131 29,182 2,051 0 0 0 27,131 29,182 2,051 1,369 682
: Head of Service - Children & Families 1,064 389 (675) 0 0 0 1,064 389 (675) (524) (151)
: Justice Services 2,472 2,472 0 0 0 0 2,472 2,472 0 0 0
: C&F Health Team 413 390 (23) 4,203 4,449 246 4,616 4,839 223 215 8
: Lead Partnership NHS Children's Services 0 0 0 712 712 0 712 712 0 0 0
CHIEF SOCIAL WORK OFFICER 1,559 1,558 (1) 0 0 0 1,559 1,558 (1) 12 (13)
PRIMARY CARE 0 0 0 53,109 53,109 0 53,109 53,109 0 0 0
ALLIED HEALTH PROFESSIONALS 0 10,306 10,306 0 10,306 10,306 0 0 0
MANAGEMENT AND SUPPORT COSTS 9,608 7,576 (2,032) 4,407 3,652 (755) 14,015 11,228 (2,787) (1,293) (1,494)
FINANCIAL INCLUSION 970 891 (79) 0 0 0 970 891 (79) 2 (81)
OUTTURN ON A MANAGED BASIS 156,390 161,189 4,799 164,745 165,878 1,133 321,135 327,067 5,932 6,973 (1,041)
Over/
(Under)
Spend
Variance at
Period 4
Movement in  
variance
from Period
4
TOTAL
Partnership Budget - Objective Summary
Council Health
2024/25 Budget
104

Page 105

PUBLIC INFORMATION 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Return Hosted Over/Underspends East 0 0 0 0 (215) (215) 0 (215) (215) (215) 0
Return Hosted Over/Underspends South 0 0 0 0 (188) (188) 0 (188) (188) (188) 0
Receive Hosted Over/Underspends South 0 0 0 0 215 215 0 215 215 204 11
Receive Hosted Over/Underspends East 0 0 0 0 (133) (133) 0 (133) (133) (77) (56)
OUTTURN ON AN IJB BASIS 156,390 161,189 4,799 164,745 165,557 812 321,135 326,746 5,611 6,697 (1,086)
Over/
(Under)
Spend
Variance at
Period 4
Movement in  
variance
from Period
4
Partnership Budget - Objective Summary
2024/25 Budget
Council Health TOTAL
105

Page 106

PUBLIC INFORMATION
2024-25 Savings Tracker          Appendix B 
Social Care:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 6
2024/25
Saving
Description of the Saving
Children, Families & Criminal Justice
Service redesign Amber Blue 0.123 Restructure areas of specialist service provision including
substance use and corporate parenting, embedding the roles and
functions of those teams within our locality-based early intervention
approaches and strategic planning including engagement.
Community Care & Health
Review of Day Care provision Amber Blue 0.100 Carry out a review and streamline day care provision.
Sensory Impairment Team Green Blue 0.062 Remove the dedicated management post and realign the team into
core social work teams.
Care Home places Green Amber 0.375 Reduce the number of funded care home places by 15, leaving
budgetary provision for 765 places at average cost.
Charging for community alarm provision
to sheltered housing tenants
Amber Blue 0.200 Introduce a charge for community alarm provision in council
sheltered housing units to ensure an equitable approach across all
housing tenures.
Montrose House capacity Green Red 0.111 Restrict the capacity at Montrose House care home to the current
level of residency.
Voluntary Early Release Green Blue 0.174 Recurring savings achieved by the release of back-office staff
through the council's voluntary early release scheme.
Carers Strategy funding Green Blue 0.384 Utilise the remaining Carer's Strategy funding to invest in respite
provision and short breaks for carers and to support existing
investments in services which support unpaid carers.
Increase to charging Green Blue 0.131 Increase charges for non-residential care by 10% and charges for
residential care by 5%
Remove vacant posts Green Blue 0.280 Remove a number of vacant posts across support services.
Employers' superannuation contributions Green Blue 7.238 Align the budget to the new employer superannuation contribution
rates from 1st April 2024.
Payroll Turnover Green Blue 0.077 Increase targets for payroll turnover through the recruitment
process.
TOTAL SOCIAL CARE SAVINGS 9.255
North Ayrshire Health and Social Care Partnership
2024/25 Savings
Support Services and Partnership-wide savings
106

Page 107

PUBLIC INFORMATION 
Health:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 6
2024/25
Saving
Description of the Saving
Hospital Based Complex Continuing
Care (HBCCC) provision
Green Blue 0.500 Align the budget to the level of ongoing need for HBCCC provision.
Increase recharge to East Ayrshire for
beds at Woodland View
Green Blue 0.021 Apply an inflationary increase to the recharge to East Ayrshire
HSCP.
Community Recovery and Rehab
provision
Amber Amber 0.100 Review and streamline a range of current provisions to remove
duplication.
Enhanced ICT Green Blue 0.100 Carry out a review of the service delivery model and release
recurring staffing savings.
Payroll Turnover Green Blue 0.314 Increase targets for payroll turnover through the recruitment
process.
TOTAL HEALTH SAVINGS 1.035
TOTAL NORTH HSCP SAVINGS 10.290
107

Page 108

PUBLIC INFORMATION
2024-25 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     156.190
Adjustments to baseline     (0.574)
Less Resource Transfer 23/24     (24.640)
Revised Budget     130.976
Resource Transfer 24/25 1-3 P 24.861
Realign Girfec Team To Connected
Communities 1-3 P (0.073)
ICT Budget Transfers 1-3 P (0.006)
CJSW Funding 2425 1-3 T 0.053
Children’s Living Wage Allocation 1-3 T 0.525
ICT Budget Transfers 6 P (0.002)
ICT Budget Transfers 6 P (0.003)
Post Realigned from the Policy, Performance &
Elections Team 6 P 0.059
Transfer to FM Services re Cleaning Services
at West Road 6 P (0.010)
Roundings 1-3   0.010
Social Care Budget Reported at Month 6 156.390
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Budget exc set aside     157.894
Add Resource Transfer 23/24     24.640
Month 10-12 Adjustments and adjusting for the
full year impact of part years amounts and
temporary funding.    
(0.033)
Revised Budget   P 182.501
Add resource Transfer 24/25     (24.861)
North Superannuation 24/25 uplift 1   1.134
MH: Anticipate Hollybush Combat Stress 24/25 1   1.424
MH: Anticipate Delivery of Veteran Funding 24/25 1   0.105
MH: Anticipate Perinatal MH, Infant MH (inc MNPI)
24/25 1   0.750
Training grade ADJ – April 1   0.063
Pecos Nurse Post  1   (0.018)
Script Switch To Pharmacy 1   (0.002)
Breastfeeding Pay Award – South 2   0.005
108

Page 109

PUBLIC INFORMATION
Nest – South 2   0.066
24-25 Foxgrove North 2   0.033
24-25 Breast Feeding – North 2   0.005
24-25 Huntingtons North 2   0.005
24-25 NEST North 2   0.066
Phlebotomy Admin Returned 2   0.005
23-24 - 50% North Share to East - Tier 3 Weight
Management 2   (0.077)
24-25 North Share to East - Tier 3 Weight
Management 2   (0.022)
Anticipate ADP Afc Pay Uplift 3   0.091
Anticipate ADP Drug Prevalence 3   0.084
Anticipate ADP Lived & Living Exp 3   0.013
Anticipate ADP Mat 3   0.250
Anticipate ADP National Mission 3   0.296
Anticipate ADP Residential Rehab 3   0.134
Anticipate ADP Whole Family Approach 3   0.094
Training Grade Adj – Jun 3   (0.054)
Prescribing (Ambush) North Rx 3   1.573
Prescribing (Ambush) North Rx Cres 3   (1.477)
24-25 North Budget Paper - Office 365 (to East) 3   (0.073)
24-25 North Budget Paper - Prison Pharm Contract
(to East) 3   (0.093)
South Mat Funding – Psychiatrist 3   0.029
Hd198: Early Intervention In Psychosis/ Body
Image And Social Media Resource 3   0.242
Hd203: Digital Mental Health Programme Licence
& Support 3   0.005
Reduction to the Working Week (mth 2 - 4)  4  0.105
Post to medical records 4  (0.037)
HD107: breast Feeding project funds 4  0.056
BBV 4  0.280
Anticipated budgets assumed in the report but not
yet allocated  4   2.045
Health Budget Reported at Month 6 164.745
TOTAL COMBINED BUDGET      321.135 
109

Page 110

PUBLIC INFORMATION
24-25 IJB Reserves Position      Appendix D 
Area of Reserves
Balance at
31 March
2024
2024-25
Anticipated
Draw Downs
Projected
Balance at
31 March
2025
: Alcohol & Drug Partnership 641 (641) 0
: Mental Health Action 15 57 (57) 0
: Service Redesign / Challenge Fund 1,774 (1,202) 572
: Community Living Change Fund 377 (377) 0
: Family Wellbeing Fund 1,313 (1,313) 0
: Wellbeing Fund 50 (50) 0
: Breast Feeding Network 26 (26) 0
: MH Recovery and Renewal 546 (546) 0
: Buvidal 23 (23) 0
: Brooksby 5 (5) 0
: Cossette Funding 4 (4) 0
: Expansion of Primary Care Estates 55 (55) 0
: GP Premises Improvements - tranches 1 and
2 63 (63) 0
: Mental Health Wellbeing in Primary Care 81 (81) 0
: Dental Practice Improvement 29 (29) 0
:Appropriate Adult Scheme 2 (2) 0
:Adult Tier 3 Weight Management Service 19 (19) 0
: Phlebotomy 22 (22) 0
: LD Health Checks 66 (66) 0
Total Earmarked 5,153 (4,581) 572
Unallocated General Fund 357 (357) 0
General Fund 5,510 (4,938) 572
Earmarked Funds
110

Page 111

PUBLIC INFORMATION
Financial Recovery Action Plan          Appendix E 
FINANCIAL RECOVERY PLAN £m £m £m
Projected Overspend at Month 6 5.611
SERVICE AREA
Cost
reduction
target
Achieved in
projected
outturn
Still to be
achieved Target set?
Health and Community Care
Reduce care home placements in line with
budget saving (0.700) 0.000 (0.700) June IJB
Reduce CAH capacity/delay recruitment/in-
house efficiencies (0.850) (0.582) (0.268) June IJB
Community Wards - reduce supplementary
staffing and review bed capacity (0.500) (0.247) (0.253) June IJB
MH and LD (North Ayrshire)
Freeze adult community support approvals
outwith transitions 0.000 0.000 0.000 June IJB
Respite provision - ensure use of in-house
capacity is maximised 0.000 0.000 0.000 June IJB
HBCCC mitigation plan (0.106) (0.106) 0.000 August IJB
MH and LD (Lead Partnership)
Ward staffing (adults/elderly inpatients) (0.300) 0.000 (0.300) August IJB
Psychiatry (use of agency) (0.312) (0.312) 0.000 August IJB
CEDS/CAMHS (0.202) (0.202) 0.000 August IJB
North Ayrshire share (38.6%) (0.314) (0.198) (0.116)
Children and Families
Reduce children's external placements - early
reduction from Brighter Pathways work (0.500) (0.500) 0.000 June IJB
Additional target re-residential placements (0.500) (0.229) (0.271) August IJB
Additional target re-residential placements (0.225) 0.000 (0.225) September IJB
Reduce investment in C&F social work via
service redesign fund (0.300) 0.000 (0.300) September IJB
Cross Partnership
Vacancy management and temporary posts (0.500) (0.500) 0.000 June IJB
Use of remaining reserve balance (0.357) 0.000 (0.357) August IJB
Review of earmarked reserves (0.216) 0.000 (0.216) September IJB
Target Achieved Outstanding
(5.068) (2.362) (2.706)
Remaining projected overspend 2.905
111

Page 112

PUBLIC INFORMATION
Bank and Agency Costs to Month 6      Appendix F 
Bank and Agency Costs
1) NHS
4863
(Registered)
4864
(Unregistered)
4853
(Registered)
4854
(Unregistered) TOTAL
AAC074 NORTH CORE SLT ADULT 8,393 8,393
AAC403 WARD 1 WOODLANDS VIEW 34,920 225,803 260,722
AAC406 WARD 2 WOODLANDS VIEW 26,513 155,470 181,983
AAC410 ACH REDBURN REHAB WARD NRS 4,978 61,525 66,503
AAC412 ACH DOUGLAS GRANT REHAB WD NRS 8,280 36,613 44,893
AAD401 WARD 3 WOODLANDS VIEW NURSING 24,023 183,094 1,589 709 209,415
AAD402 WARD 4 WOODLANDS VIEW NURSING 27,339 154,288 185 181,812
AAH047 NEW CLONBEITH NURSING(JURA) 70,510 52,118 122,628
AAH415 WVIEW THE GLEN ECT 1,797 1,797
AAH417 WVIEW WARD 10 ACUTE MH NRS 30,213 42,330 72,543
AAH423 WVIEW WARD 8 ACUTE MH NRS 18,861 431,987 251 451,100
AAH460 WARD 5 WOODLANDS VIEW 13,856 17,339 31,195
AAH466 WVIEW WARD 7B REHAB MH NRS 2,103 2,103
AAH492 NEW DUNURE NURSING(CLONBEITH) 29,391 83,451 112,842
AAT001 TRINDLEMOSS 38,661 87,076 125,737
AAW047 ARRAN HOSPITAL NURSING 16,496 21,877 13,091 51,465
ACA405 CAMHS MANAGEMENT 1,943 1,943
ACN004 PACKAGE OF CARE (P) - CY 15,313 15,313
ACN012 PACKAGE OF CARE (P) - AMG 36,067 36,067
ACN013 PACKAGE OF CARE (P) - LMO 4,884 4,884
ACP002 NC POC TEAM 2 259 259
ACP003 NC POC TEAM 3 1,199 1,199
ACA412 CAMHS UNSCHEDULED CARE 3,287 3,287
ACF002 EARLY YRS-C/F TEAM 2 290 290
ACF051 IMMUNISATION NURSING 11,321 7,237 18,558
ACN000 ARRAN HV 316 316
ACN047 ARRAN DN 235 235
ADN000 THREE TOWNS DN 7,927 161 8,088
ADN033 IRVINE DN 13,138 13,138
ADN042 NORTH WEST COAST DN 4,037 99 4,136
ADN075 GARNOCK VALLEY DN 58,839 58,839
ADN080 NORTH DN TEAM LEADERS 4,286 4,286
ALA047 LADY MARGARET NURSING 9,159 4,116 13,275
AMA408 PREVENTION + SERVICES SPT TEAM 1,481 1,481
AML146 LD HEALTH CHECKS 73,240 73,240
AML392 NORTH CLDT 429 429
AML402 LDS MANAGEMENT 4,190 4,190
AML442 NORTH PARTNERSHIP ADMIN MH 13 13
AML500 MHS INPATIENT MGT 16,335 16,335
AMN412 CMHT NURSING-NORTH AYRSHIRE 8,054 8,054
AMN415 WVIEW WARD 7C FORENSIC REHAB N 5,340 72,642 77,982
AMN419 DAY ACTIVITIES TEAM 227 227
AMN425 INTENSIVE COMMUNITY NURSING TEAM 21,003 21,003
AMN431 ADULT MENTAL HEALTH LIASION TEAM 2,295 2,295
AMN433 PCMHT NORTH 1,663 1,663
AMN446 WVIEW WARD 6 LOW SECURE NRS 37,984 117,628 155,611
AMN454 WARRIX AVE 12,933 19,271 32,204
ANP074 NORTH CORE SLT PAEDS 1,483 1,483
AMN468 ACTION 15 - ADULT LIAISON 5,410 5,410
ANU632 ICFN - COMMUNITY PHLEBOTOMY 6,877 6,877
AWV438 WVIEW WARD 7A LD A+T NRS 11,497 382,852 1,588 5,379 401,316
AXC407 WVIEW WARD 9 ACUTE MH NRS 22,091 101,402 123,494
AXC418 WVIEW WARD 11 ACUTE MH NRS 46,675 155,589 257 202,521
TOTAL 723,286 2,498,562 16,442 6,782 3,245,072
2) SOCIAL CARE Month 6
Agency Cost
Montrose House 498,029       
Acm - Irvine 1,188          
Mh Acm 54,708        
Ld Acm 15,852        
TOTAL 569,777       
Bank Agency
112

Page 113

113

Page 114

114

Page 115

115

Page 116

116

Page 117

117

Page 118

118

Page 119

119

Page 120

120

Page 121

NORTH AYRSHIRE COUNCIL 
03 December 2024 
Cabinet
Title: Strategic Housing Investment Plan 2025 – 2030
Purpose: To seek Cabinet approval of the Strategic Housing Investment   
Plan 2025 – 2030 
Recommendation: That Cabinet: (i) approves the Strategic Housing Investment Plan
2025-2030 at Appendix 1 for submission to Scottish Government;
(ii) approves the projects set out within the SHIP shadow
programme at Appendix 1; (iii) gives delegated authority to the
Executive Director (Communities and Housing) and the Cabinet
Member for Communities and Islands to liaise directly with the
Scottish Government in agreeing the acceleration of projects in
the main SHIP programme, as required; and (iv) notes that
acceleration of any projects from the SHIP shadow programme
will require Cabinet approval. 
1. Executive Summary 
1.1 The Strategic Housing Investment Plan (SHIP) is reviewed annually and sets out the
priorities and locations for affordable housing investment by the Council and registered
social landlords in North Ayrshire for a five-year period. 
1.2 Cabinet approved the Strategic Housing Investment Plan 2024 – 2029, delivery of 26 new
homes at St Mary’s, Largs, and a Buy Back programme to support Ukrainian Displaced
People in November 2023. The reports made a combined commitment for the Council and
its partners to deliver 1,368 new affordable homes by March 2029, supported by
anticipated £130m Scottish Government grant funding from April 2023 to March 2029. A
total of 78 new build homes and 42 buybacks were completed during 2023/24 from the
1,368 target. 
1.3 In May 2024, the Council was advised of a reduction to the 2024/25 funding Resource
Planning Assumption (RPA), and of an expectation that the funding would reduce in future
financial years. For strategic planning purposes, the Council was advised that the level of
funding that the government can legally commit to, for the current and three future financial
years (April 2024 to March 2028), is £33.264m. In September 2024, the 2024/25 RPA was
increased by £0.293m to be utilised to acquire housing (new build or off the shelf) and / or
to bring long term voids back into use to address temporary accommodation pressures,
revising the legal commitment value to £33.557m. 
1.4 Officers have been advised to assume funding for the Strategic Housing Investment Plan
2025-2030 at £11.880m per annum from April 2025 to March 2030. The draft SHIP is
Agenda Item 9
121

Page 122

therefore based on projected Scottish Government grant funding of £71.573m for the
Council and its partner landlords for the six years from April 2024 to March 2030. 
1.5 The Council and its partners have legally agreed funding commitments totalling £32.876m
to date. When deducted from the current £33.557m maximum legal commitment available
this results in a balance of £0.681m uncommitted funding. 
1.6 The amount of funding that the government can legally commit to will increase if: 
• the Council is successful in obtaining additional funding from the £40m unallocated
grant allowance for local authorities during 2025/26.
• the Council is able to claim funding from slippage in other local authority areas.
• the RPA award for 2025/26 is above the current £9.504m legal commitment. 
1.7 Due to the funding reductions, existing projects have had to be prioritised based upon
housing need, deliverability, strategic alignment, value for money, and their impact upon
community regeneration in order to align with the grant funding envelope currently
available. Projects which cannot be supported in the main programme, due to the current
lack of funding, have been moved to a shadow programme which will be accelerated,
subject to Cabinet approval, should slippage occur in the main programme, or if additional
funding becomes available. 
1.8 To increase capacity, and as one of the sites is currently in use, the following projects
have been removed from the programme: 
• Refurbishment project 8 (2 units), North Ayrshire Council 
• Glebe Place, Saltcoats (8 units), North Ayrshire Council (currently in use)
• Unallocated block (67 units), Cunninghame Housing Association 
1.9 The Council and its partners continue to experience significant affordability challenges
due to changes in the rate of inflation, higher than budgeted interest rates for borrowing
and increasing housing standards and specifications, compared to the level of grant
funding available to offset these pressures. 
1.10 The Council projects detailed within the main programme represent Council investment of
£173.644m, supported by £80.550m Scottish Government Grant. Following the review of
the SHIP, an estimated additional £9.171m is required beyond the funding allocated in the
latest HRA 30-year Business Plan, which is expected to be addressed by an estimated
additional £12.524m in grant funding for the Council projects within the main programme.
The Council projects in the prioritised SHIP have grant funding assumed at benchmark
rates inflated to the site start date at an assumed 3.1% per annum. The funding variances
are considered within the current review of the HRA Business Plan, prior to it being
presented to Council in February 2025 as part of the 2025/26 HRA budget and rent setting. 
1.11 The Council projects within the shadow programme represent Council investment of
£41.289m, supported by £23.802m Scottish Government Grant. The Council projects in
the shadow programme have grant funding set at levels which will allow the schemes to
be wholly funded with borrowing costs offset by rental income, this approach has been
taken to remove the impact of these sites from the HRA Business Plan as part of the
2025/26 HRA budget and rent setting.
122

Page 123

1.12 The Council has delivered 897 new build homes (as at 11 November 2024) against its
1,641 unit target, with 744 homes still to be completed. The amendments to the SHIP
revise the Council’s cumulative new build development target to 1,643 units. 
1.13 It is proposed that delegated authority is assigned to the Executive Director (Communities
and Housing), in consultation with the Cabinet Member for Communities and Islands, to
liaise with the Scottish Government and agree the acceleration of projects detailed in the
main Strategic Housing Investment Plan, as required. This is of particular importance
where deliverability is delayed due to emerging constraints and challenges that require to
be addressed. Cabinet approval will be required for the acceleration of any projects in the
shadow programme or for the addition of any new projects to the approved Strategic
Housing Investment Plan. 
1.14 The draft Strategic Housing Investment Plan 2025 - 2030 aims to secure investment in a
total of 1,143 properties, providing sustainable, affordable, accessible, and high-quality
homes which will contribute to the wider regeneration aims for the area. This will in turn
secure employment and training opportunities for North Ayrshire businesses and residents
and support the Council’s Community Wealth Building Strategy. Members are invited to
approve the SHIP and the shadow programme at Appendix 1 for submission to the
Scottish Government, as the Council’s investment plan for new affordable housing in the
area over the next five years. 
2. Background 
2.1 The Strategic Housing Investment Plan (SHIP) sets out the priorities and locations for
affordable housing investment by the Council and registered social landlords in North
Ayrshire over a five year period to support the outcomes in the Local Housing Strategy. It
is prepared in accordance with Scottish Government guidance and includes details of
individual development projects to be taken forward over its lifespan (see Appendix 1). 
2.2 Cabinet approved the Strategic Housing Investment Plan 2024 – 2029 on 7 November
2023 which made a commitment for the Council and its partners to deliver 1,302 new
homes, on the assumption that this would be supported by £124m Scottish Government
grant funding. Cabinet also approved the development of 26 new homes on the former St
Mary’s school site, supported by £4m Scottish Government grant funding, and the
acquisition of up to 40 properties supported by £2m grant to accommodate Ukrainian
Displaced People for three years. 
2.3 The reports made a combined commitment for the Council and its partners to deliver 1,368
new affordable homes by March 2029, supported by £130m Scottish Government grant
funding for the six years from April 2023 to March 2029. 
2.4 In accordance with Scottish Government guidance, the Council has historically over-
committed the funding within the Strategic Housing Investment Plan by approximately 25%
to ensure that the full grant allocation is spent, and to provide the opportunity for North
Ayrshire to absorb slippage from other local authority areas.   
2.5 A total of 78 new build homes were completed during 2023/24 towards the 1,368 target.
This comprises Cunninghame Housing Association’s 24 homes at Green Street, Saltcoats,
and for the Council, the remaining 36 homes at Irvine Harbourside, six bungalows at Afton
Court, Stevenston, and 12 amenity flats at the former Largs Police Station. 
123

Page 124

2.6 The Council and its partners acquired 42 buybacks during 2023/24. The Council
purchased 33 homes for Ukrainian households and five homes for the Council’s buyback
programme. Riverside Scotland bought back two homes in Kilwinning and Trust Housing
Association acquired two homes on Arran. 
Resource Planning Assumption 
2.7 The Council was advised of a reduction to the 2024/25 funding Resource Planning
Assumption (RPA) in May 2024. The Council was also advised of an expectation that the
funding would reduce in future financial years. The Scottish Government committed to
providing North Ayrshire Council and its registered social landlord partners with grant
funding of £11.880m from April 2024 to March 2025 and advised the amount of funding
which could be legally committed for April 2025 to March 2028 is: 
• 80% of £11.880m for 2025/26 (£9.504m).
• 60% of £11.880m for 2026/27 (£7.128m).
• 40% of £11.880m for 2027/28 (£4.752m). 
2.8 In September 2024, the Council was advised of a £0.293m increase to the 2024/25
Resource Planning Assumption, revising it to £12.173m. This funding is allocated from a
£40m fund for local authorities during 2024/25 to address temporary accommodation
pressures. The £0.293m should be directed towards acquisitions to help address
temporary accommodation pressures or, where appropriate, to bring long term voids back
into use. Acquisitions can either be existing properties or new build properties ‘off the
shelf’. There is a further £40m fund to be distributed to local authorities during 2025/26,
the allocation of which is still awaited. 
2.9 For strategic planning purposes, the level of funding that the government can currently
legally commit to from April 2024 to March 2028 is therefore £33.557m as illustrated in
Table 1 below.   
Table 1: Government grant funding which can be legally committed by financial year
Financial
year
Maximum legal
commitment
2024/25 £12.173m
2025/26 £9.504m
2026/27 £7.128m
2027/28 £4.752m
Total £33.557m 
2.10 The Council and its registered social landlord partners have offers of grant funding totalling
£44.245m (as at 1 October 2024) to deliver 369 units for the four year period as detailed
within Table 2 below. A total of £11.369m of this funding had been claimed as at 31 March
2024, leaving a £32.876m balance still to be claimed. 
Table 2: SHIP projects with committed Scottish Government grant funding.
Site Units
Scottish
Government
Grant (£m)
Pre 2024/25
Spend (£m)
Future
Spend (£m)
Laburnum Avenue, Beith (NAC) 7 £0.700 £0.621 £0.079
Newhouse Drive, Kilbirnie (NAC) 7 £0.699 £0.620 £0.079
124

Page 125

St Mary's, Largs (NAC) 26 £3.977 £2.458 £1.519
James McFarlane, Ardrossan (NAC) 19 £1.993 £0.801 £1.192
Stanecastle, Irvine (NAC) 31 £3.204 £1.082 £2.122
King's Arms, Irvine (NAC) 6 £0.769 £0.313 £0.456
Garnock Academy, Kilbirnie (NAC) 50 £5.307 £0.530 £4.777
Ayrshire Central, Irvine (NAC) 202 £24.356 £2.253 £22.103
Garven Road, Stevenston (CHA) 20 £3.200 £2.691 £0.509
Riverside Buy Back Programme 1 £0.040 £0.000 £0.040
Total 369 £44.245 £11.369 £32.876 
2.11 Deducting the £32.876m required from the £33.557m maximum legal commitment
available leaves a balance of £0.681m uncommitted funding. As set out at 2.8 above,
£0.293m should be committed to address temporary accommodation pressures, resulting
in £0.388m uncommitted funding for the remaining projects within the Strategic Housing
Investment Plan. 
2.12 Officers have been advised to assume funding for the Strategic Housing Investment Plan
2025-2030 at £11.880m per annum for the five years from April 2025 to March 2030. The
draft Strategic Housing Investment Plan is therefore based on projected Scottish
Government grant funding of £71.573m for the Council and its partner landlords for the
six years from April 2024 to March 2030 as illustrated in Table 3 below. 
Table 3: Resource Planning Assumption and maximum legal commitment per annum (£m) 
2024/25 2056/26 2026/27 2027/28 2028/29 2029/30 Total
(£m)
Resource
Planning
Assumption
£12.173 £11.880 £11.880 £11.880 £11.880 £11.880 £71.573
Maximum
legal
commitment 
£12.173 £9.504 £7.128 £4.752 £0.000 £0.000 £33.557 
2.13 In summary, whilst the Council’s assumed financial envelope for the period is £71.573m,
the amount of funding that the government can currently commit to legally is £33.557m.
This means that applications for funding beyond the £0.681m uncommitted funding
balance cannot be approved until further funding becomes available, which, in time, could
delay development.   
Preparing the Strategic Housing Investment Plan 2025 - 2030 
2.14 Due to the funding reductions, the existing SHIP projects have been prioritised based upon
housing need, deliverability, strategic alignment, value for money, and their impact upon
community regeneration to align to the grant funding envelope anticipated to be available.
Projects which cannot be supported in the main programme, due to the current lack of
funding, have been moved to a shadow programme which will be accelerated, subject to
Cabinet approval, should slippage occur in the main programme, and/or if additional
funding becomes available or as part of future annual SHIP reviews. 
2.15 Bringing primarily former social housing stock back into ownership can assist with housing
management and maintenance issues, increases housing supply, supports the Council’s
Regeneration Delivery Plan, and contributes to bringing long-term empty homes back into
use. All developing registered social landlord partners buyback programmes have
125

Page 126

therefore been prioritised within the Strategic Housing Investment Plan. 
2.16 The projects which have been prioritised in the main programme, which do not already
have an offer of grant as set out within Table 2 above, are detailed in Table 4 below
alongside the rationalisation for their prioritisation. The Council projects in the prioritised
SHIP have grant funding assumed at benchmark rates inflated to the site start date at an
assumed 3.1% per annum. 
Table 4: Projects prioritised in the main SHIP programme
Site Units Estimated
Site Start
Grant
funding
(£m)
Pre
2024/25
Grant
Spend
(£m)
Future
Grant
Spend
(£m)
Council
funding
(£m)
Rationale for
prioritisation
Nelson Street,
Largs (NAC) 3 Apr 2025 £0.171 £0 £0.171 £0.461
These homes are currently
empty and require
investment to be brought
back into effective use
Montgomerie
Park, Irvine
(NAC)
188 Mar 2026 £24.822 £4.579 £20.243 £29.285
Significant level of grant
claimed to date in relation
to site acquisition and
ground consolidation costs.
Site forms part of
compensatory provision for
the demolition of high flats.
Site contributes to wider
Masterplan area and school
roll.
Nursery Place,
Ardrossan
(NAC)
6 Apr 2026 £0.796 £0 £0.796 £0.962
The existing flatted
accommodation is being
vacated and the blocks are
scheduled for demolition.
The schemes require a low
level of investment making
them a good fit to absorb
slippage. 
Grange Court,
Stevenston
(NAC)
6 Apr 2026 £0.824 £0 £0.824 £0.683
Fullarton Street,
Irvine (NAC) 43 Jul 2026 £5.902 £0 £5.902 £7.051
The high flats have been
demolished and the
development will contribute
to stock replacement and
regenerate the vacant site
which is in a prominent
location.
Bourtreehill
Village, Irvine
(NAC)
32 Aug 2028 £4.630 £0 £4.630 £5.294
Crofthead Court has been
vacated and is scheduled
for demolition. The site is
part of a wider area
regeneration.
Springbank,
Arran (Trust) 26 Dec 2025 £5.000 £0 £5.000 
Arran development has
been long standing in the
SHIP and the site
contributes to addressing
housing need on the island.
Council Buy
Backs 60 Apr 2024 £2.400 £0 £2.400 £3.403 The acquisition of market
housing & empty homes
can assist with housing
management &
maintenance issues &
increase housing available
for social rent.
Cairn Buy Backs 2 Apr 2024 £0.085 £0 £0.085 
CHA Buy Backs 6 Nov 2023 £0.240 £0 £0.240 
Riverside Buy
Backs 14 Apr 2023 £1.328 £0.080 £1.248 
Trust Buy Backs 6 Nov 2023 £0.600 £0.196 £0.404 
126

Page 127

Total 392  £46.798 £4.855 £41.943 £47.139 
2.17 Deducting the £32.876m legally committed sites and £41.943m sites prioritised within the
SHIP from the £71.573m projected grant funding leaves a balance of (£3.246m) for the
sites within the SHIP shadow programme.   
2.18 The Council projects in the shadow programme have indicative grant funding set at levels
which will allow the schemes to be wholly funded with borrowing costs offset by rental
income, this approach has been taken to remove the impact of these sites from the HRA
Business Plan as part of the 2025-26 HRA budget and rent setting review. It should be
noted that whilst this approach reduces the impact upon the HRA Business Plan, it
increases the demand upon the Resource Planning Assumption funding available within
the SHIP. The registered social landlord funding rates are also indicative and will be
subject to review at the point of the funding application when a construction tender has
been received. The projects in the shadow programme are listed in Table 5 below. Some
sites have been anonymised for reasons of commercial sensitivity, or as they require
further work to ensure that they comply with the Council’s Planning or Roads policies. 
Table 5: Projects in the SHIP shadow programme
Site Units Estimated
Site Start
Grant
Funding
(£m)
Pre
2024/25
Spend
(£m)
Future
Spend
(£m)
Comments /
constraints / current
challenges
Corsehillhead,
Kilwinning (NAC) 7 Jul 2027 £1.908 £0.203 £1.705
Options appraisal
required for financial
viability.
James Reid,
Saltcoats (NAC) 46 Jul 2027 £7.215 £0.830 £6.385
Culvert issues are
preventing Scottish
Water approval.
St Michael’s P3,
Kilwinning (NAC) 46 Oct 2027 £7.433 £0 £7.433
Site replaces the
unallocated
regeneration block.
Regeneration 1d,
Ardrossan (NAC) 36 Jan 2028 £7.246 £0 £7.246 Awaiting confirmation
of site availability.
Redburn Place
(Confidential site
1), Irvine (Cairn)
10 Oct 2025 £1.800 £0 £1.800 Planning consent
required.
Confidential site 3,
Kilwinning (Cairn)  4 Apr 2027 £0.407 £0 £0.407
Planning consent and
land acquisition
required.
Confidential site 12,
Kilwinning (CHA) 25 Apr 2026 £4.000 £0 £4.000
Site replaces part of
CHA unallocated
block.
Bank Street (111),
Irvine (CHA) 16 Apr 2027 £2.560 £0 £2.560 Proposals to be
agreed with CHA.
Sharphill (Ph 5),
Saltcoats (CHA) 100 Oct 2028 £14.800 £1.277 £13.523 Financial viability
assessment required.
Confidential site 10,
Ardrossan (CHA) 50 Apr 2029 £8.000 £0 £8.000
Land acquisition and
site feasibility
assessment required.
Parkend Gardens,
Saltcoats (Link) 12 Jan 2029 £1.910 £0.083 £1.827 Financial feasibility
review is ongoing.
Regeneration 3,
Kilwinning
(Riverside)
30 Apr 2028 £2.834 £0 £2.834 Location to be
finalised.
Total 382  £60.113 £2.393 £57.720 
2.19 It should be noted that the amount of funding that the government can legally commit to
127

Page 128

will increase if: 
• the Council is able to claim funding from slippage in other local authority areas.
• the Resource Planning Assumption award for 2025/26 is above the current £9.504m
legal commitment.
• the Council is successful in obtaining additional funding from the £40m unallocated
grant allowance for local authorities during 2025/26. 
2.20 The financial and / or technical feasibility is still being reviewed for a number of the sites
within the SHIP. 
Alternative funding and delivery models 
2.21 The Strategic Housing Investment Plan is not the only funding mechanism being explored
to deliver new build or acquired affordable housing. The Council and its partners are
exploring alternative delivery and funding models to maximise the funding available, and
units delivered, and reduce demand for the Council’s Resource Planning Assumptions.
For example, Trust Housing Association are accessing the governments Affordable
Housing for Key Workers initiative to acquire second hand homes on Arran. It is hoped
that alternative delivery mechanisms can free up funding within the main SHIP
programme, or assist to fund projects within the shadow programme, if funding does not
become available through slippage or additional grant funding allocations. As part of the
annual rent consultation an option has been included to consider an additional 1%
increase to support an increased provision of Council housing. 
Amendments to the SHIP 
2.22 In order to increase capacity within the SHIP, and as one of the sites is currently in use,
the projects listed below have been removed from the programme:
• The Council’s 2 unit refurbishment project 8 (£0.114m) 
• The Council’s 8 unit Glebe Place, Saltcoats project (£0.836m)
• 67 units from Cunninghame Housing Association’s unallocated block (£10.720m) 
2.23 An options appraisal determined that refurbishment project 8 would not represent value
for money and therefore the site was not acquired. The Glebe Place, Saltcoats homes,
which were previously scheduled for demolition, are currently occupied following
refurbishment, the options for the site will be considered when the properties become void.
Cunninghame Housing Association has retained 25 units from its unallocated block for a
scheme in Kilwinning. There are no other schemes associated with the remaining 67 units
which have been removed to aid overall affordability of the programme based on current
funding assumptions. 
2.24 The following amendments have also been made to the Strategic Housing Investment
Plan:
• The Council’s Montgomerie Park, Irvine site has been reduced from 189 to 188
units due to site constraints. The one excess unit has been moved to the
unallocated regeneration block.
• The Council’s Fullarton site has been reduced from 62 units to 43 units due to site
restrictions associated with flood risk. The 19 excess units have been moved to the
unallocated regeneration block.
128

Page 129

• The Council’s James Reid site has been reduced from 47 units to 46 units due to
site constraints. The one excess unit has been moved to the unallocated
regeneration block.
• The eight units associated with the Council’s Glebe Place, Saltcoats project have
been moved to the unallocated regeneration block as the site has been removed
from the plan.
• The Council’s unallocated regeneration block has been increased from 15 units to
44 units, utilising the 29 units reallocated from the four sites above. 
• A site has been identified for the Council’s unallocated units which will complete
the final phase of the former St Michael’s Academy in Kilwinning. The site can
provide 46 units, and as grant has been assumed at a rate which will deliver the
site with no impact to the HRA 30 year business plan, the additional two units have
also been included within the SHIP shadow programme. 
2.25  The Scottish Government benchmark grant rates are subject to annual inflation in line with
the Scottish Social Housing Tender Price Index. The Council and its partners continue to
experience significant affordability challenges due to changes in the rate of inflation, higher
than budgeted interest rates for borrowing and increasing housing standards and
specifications, compared to the level of grant funding available to offset these pressures.
The government has advised the Council and its partners that there is flexibility within the
grant award assessments and to seek funding at the minimum levels required to deliver
schemes, as the benchmark levels are set to determine the funding appraisal route. It
should be noted that each project is assessed on a case by case basis and funding may
be capped in accordance with the government’s value for money assessment. If the grant
funding obtained for sites increases, the capacity of the total Resource Planning
Assumption (which has been treated as fixed) will be reduced, as less units can be
delivered within the overall funding available. 
Progress to date 
2.26 The Council and its partners have delivered 1,778 new build homes since April 2013.
.
2.27 The approval of the Strategic Housing Investment Plan 2024 – 2029 revised the Council’s
new build completion target to 1,615 units. The addition of the 26 units at the former St
Mary’s site in Largs further revised the target to 1,641 units. The Council had delivered
885 new build homes to 31 March 2024, with 756 homes still to be completed. A further
12 homes have been completed at Newhouse Drive, Kilbirnie (three homes) and St Mary’s,
Largs (nine homes) as at 11 November 2024 leaving 744 homes still to be completed. 
2.28 The Council’s new build development target has been increased to 1,643 units from 1,641
units following the addition of the third phase St Michael’s Wynd site, which replaced the
unallocated regeneration block. 
2.29 Cunninghame Housing Association completed their 20 unit Garven Road, Stevenston
development in October 2024. The site provided 17 two bedroom general needs homes,
one three bedroom general needs house, a two bedroom amenity property and a two
bedroom bungalow suitable for wheelchair users. 
2.30 As reported to Cabinet on 7 November 2023, due to past successes in accelerating
projects and claiming additional funding year upon year, alongside slippage in some
projects, North Ayrshire was unable to claim the Resource Planning Assumption for the
2023/24 financial year. The Council claimed an estimated total of £10.234m against the
129

Page 130

Resource Planning Assumption of £15.648m for the year (this value will be confirmed
when the Scottish Government out-turn report is published later this year). This value is
£0.441m higher than the spend estimate reported to Cabinet in November 2023. 
2.31 As previously reported, the Council and its partners claimed an additional £19.165m
towards affordable housing in the area from slippage in other local authority areas in the
six years from April 2016 to March 2022. The slippage during 2022/23 and 2023/24
therefore results in a cumulative over-claim of £2.361m against the Resource Planning
Assumption for the period. Slippage was experienced at a number of Council
developments due to redesign works required as a result of regulatory changes and
assessment of zero direct emissions heating systems options. 
Housing demand 
2.32 Housing demand figures were obtained from the North Ayrshire Housing Register during
June 2024, there were 3,575 applicants with an assessed housing need. Proportionate
demand for social housing by locality is illustrated in Chart 1 below. The house size and
type priorities within the SHIP have also been informed by housing register demand. 
2.33 The Arran Housing Task Force was established to quantify the demand for affordable
housing on Arran and identify issues that may be limiting economic growth. A quantitative
study has been undertaken by North Star Consulting and Research to determine
affordable housing demand on the island. The Task Force has developed an action plan
to address any identified housing issues on the island. 
2.34 No demand issues have been identified in relation to accommodation for gypsy /
travellers.  Following consultation with current tenants at Redburn Grove, Irvine in April
2023, future improvement proposals for the site are being developed and costed, reflecting
feedback gathered in relation to their preferences for future housing. A business case is
being developed which will include all available funding streams and a full options
appraisal for the site, including the potential to transfer the site from the General Fund to
the Housing Revenue Account. 
Proposed housing delivery 
Arran, 163, 5%
Cumbrae (part of North
Coast), 33, 1%
Garnock Valley,
328, 9%
Irvine, 1366, 38%
Kilwinning, 494, 14%
North Coast, 339,
9%
Three Towns, 852,
24%
Chart 1: Proportionate demand for social housing by locality
130

Page 131

2.35 The Council and its registered social landlord partners aim to provide a total of 1,143 new
affordable homes across the six localities in the draft plan. The anticipated house types to
be delivered by locality are noted in Table 6 below. The 83 units noted as ‘TBA’ are the
buybacks being progressed by four developing organisations. 
Table 6: New supply housing (including buy backs & refurbs) by locality & type
Locality Arran Garnock
Valley Irvine Kilwinning North
Coast
Three
Towns TBA Sub
Total 
Total
All
Family
NAC 0 36 263 31 17 66 60 473
747 Family
RSL 32 0 22 48 0 149 23 274
Amenity
NAC 0 19 140 12 12 22 0 205
236 Amenity
RSL 0 0 2 5 0 24 0 31
Sheltered
NAC 0 0 0 0 0 0 0 0
0 Sheltered
RSL 0 0 0 0 0 0 0 0
W/chair
NAC 0 9 99 10 0 25 0 143
160 W/chair
RSL 0 0 2 6 0 9 0 17
Total All 32 64 528 112 29 295 83 1,143
Total
NAC 0 64 502 53 29 113 60 821
Total RSL 32 0 26 59 0 182 23 322 
2.36 The Council and its registered social landlord partners completed and planned
developments are noted by locality alongside housing demand in Table 7 below. 
Table 7: Housing demand and completed and planned development 
Arran Garnock
Valley Irvine Kilwinning North
coast
Three
Towns TBA Total
Demand
at June
2024
163 328 1366 494 372 852 0 3,575
Complete
at March
2024
90 73 592 283 351 389 0 1,778
Planned 32 64 528 112 29 295 83 1,143
Total
(complete
plus
planned)
122 137 1,120 395 380 684 83 2,921
*It should be noted that, in addition to the above RSL and NAC plans, Arran Development
Trust will deliver 18 new affordable homes in Lamlash, Arran. 
2.37 Chart 2 plots Strategic Housing Investment Plan completions against the net stock gain.
The 'net gain' column indicates the additional homes available per locality following
completion of the developments, minus the strategic demolitions set out in the plan. It also
illustrates proportionate demand from the housing register as at June 2024 and historic
new build completions from April 2013 to March 2024. Please note that proportionate
131

Page 132

demand is indicative to illustrate trends; the actual demand figures will be less as transfer
applicants who are included in these figures will leave an existing tenancy behind when
they are allocated a new home. 
Chart 2: Completions, net gain, proportionate demand and historic completions 
2.38 If any project becomes delayed or non-viable, the Council will work with registered social
landlord partners and the Scottish Government to review alternative opportunities to
ensure that new homes are delivered, and the available grant funding spent. 
2.39 In order to ensure that the Council can quickly absorb funding available from other local
authorities (which is generally available at short notice at the financial year end) and spend
its annual Resource Planning Assumption, Cabinet is asked to delegate authority to the
Executive Director (Communities and Housing), in consultation with the Cabinet Member
for Communities and Islands, to liaise with the Scottish Government and agree the
rescheduling of the projects noted within the main Strategic Housing Investment Plan, as
required. This is of particular importance where deliverability is delayed due to emerging
constraints and challenges that require to be addressed. Spending on projects within the
shadow programme or the additional of any new projects will require Cabinet approval. 
2.40 The Council will continue to progress sites within the SHIP shadow programme to a ‘shovel
ready’ state to support the absorption of any additional funding made available. 
2.41 In terms of ongoing governance, senior officers monitor the progress of the new build
programme monthly through the Strategic Housing Investment Plan project board. 
0
200
400
600
800
1000
1200
1400
Irvine Kilwinning 3 Towns North
Coast
Garnock
Valley
Arran TBA
SHIP Completions 2013 - March  2024
SHIP Completions April 2024 - March 2030
Net Gain 2013-2030
Proportionate Demand from NAHR
132

Page 133

Strategic Priorities 
2.42 The Strategic Housing Investment Plan is based on a series of guiding principles for
housing provision, taken from the Local Housing Strategy 2023 - 2028. The plan also
contributes to a wider range of Council and national priorities, including: 
• Children’s rights and wellbeing
• 20-minute neighbourhoods to allow people to meet their needs locally, where
feasible
• Regeneration, including town centre and estate based regeneration
• Green space provision for tenants
• Investment in island communities 
• Refugee resettlement programme
• Sustainability, affordable warmth and zero emissions
• Specialist accommodation delivery to support residents to live independently
• Bringing empty homes back into use 
SHIP impact on North Ayrshire school capacity 
2.43 Experience at other sites demonstrates that new affordable housing developments
generally comprise of families who already reside within the school catchment area.
Officers from Housing, Planning and Education continue to monitor developments to
ensure any impact upon school capacity can be addressed or mitigated. 
SHIP Investment 
2.44 The draft Strategic Housing Investment Plan (SHIP) 2025 - 2030 is based on future
projected Scottish Government grant funding provision of £132.538m for the Council and
its partner landlords from April 2024 to March 2030. 
2.45 The Council projects detailed within the main programme represent Council investment of
£173.644m, supported by £80.550m Scottish Government Grant. Following the review of
the SHIP, an estimated additional £9.171m is required beyond the funding allocated in the
latest HRA 30-year Business Plan, which is expected to be addressed by an estimated
additional £12.524m in grant funding for the Council projects within the main programme.
The £9.171m funding requirement comprises increased budget estimates due to delays
associated with grant funding reductions, and budget adjustments required to align with
revised project timelines. The funding variances are considered within the current review
of the HRA Business Plan, prior to it being presented to Council in February 2025 as part
of the 2025/26 HRA budget and rent setting. 
2.46 The Council projects within the SHIP shadow programme represent Council investment
of £41.289m, supported by £23.802m Scottish Government Grant. The grant funding rates
for the Council projects in the SHIP shadow programme are £4.708m higher than the
estimated benchmark rates inflated to their anticipated site start date, at an assumed 3.1%
per annum. 
2.47 As noted at 2.25 above, in accordance with Scottish Government guidance, the Council
will seek grant funding above benchmark levels to offset any funding shortfall, on a site-
133

Page 134

by-site basis, as required. 
3. Proposals 
3.1  It is proposed that Cabinet (i) approves the Strategic Housing Investment Plan 2025-
2030 at Appendix 1 for submission to Scottish Government; (ii) approves the projects
set out within the SHIP shadow programme at Appendix 1; (iii) gives delegated authority
to the Executive Director (Communities and Housing) and the Cabinet Member for
Communities and Islands to liaise directly with the Scottish Government in agreeing the
acceleration of projects in the main SHIP programme, as required; and (iv) notes that
acceleration of any projects from the SHIP shadow programme will require Cabinet
approval. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications arising from the projects included within the Strategic Housing
Investment Plan 2025-2030 have been assessed by each of the developing
organisations, ensuring that the programme is fully deliverable within the timescales set
out. The current HRA Business Plan includes a budget of £164.473m to deliver the
North Ayrshire Council development projects set out within the main SHIP programme,
inclusive of Scottish Government funding. It is estimated that an additional £9.171m is
required to support the Council’s developments set out within the main SHIP 2025-
2030, which is expected to be addressed by an estimated additional grant income of
£12.524m. The funding variances and the removal of the Council projects in the SHIP
shadow programme are considered within the current review of the HRA Business Plan
prior to it being presented to Council in February 2025 as part of the 2025-26 HRA
Budget and rent setting. The projects within the SHIP shadow programme are
anticipated to require estimated funding of £41.289m, inclusive of £23.802m
government grant. 
Human Resources 
4.2 Council projects within the Strategic Housing Investment Plan will be delivered by North
Ayrshire Council staffing and complemented by external expertise, where required. 
Legal 
4.3 The Town & Country Planning (General Permitted Development) (Scotland) Order
1992, Schedule 1, Part 12, Class 33, as amended, enables local authorities to
undertake works, within their district, for the erection of dwellings so long as the
development conforms with the Local Development Plan. The Council’s House Building
Protocol governs the design and consultation processes for such development to
ensure that appropriate levels of design scrutiny and consultation are maintained.  In
2019, it was agreed that all future Council housing developments progressed as
permitted development will be required to obtain a ‘Certificate of Lawfulness’ from the
Council’s Planning Service. This will certify that each site within the SHIP has been
considered against the full terms of the adopted Local Development Plan. Housing
development proposals by the Council which do not fall within the scope of permitted
development, including schemes which require an Environmental Impact Assessment
(EIA) will require planning permission. Proposals over 0.5 hectares in area will require
134

Page 135

to be screened for the purposes of EIA. 
Equality/Socio-economic 
4.4 The provision of new social housing will have a positive impact on those who require
specialist accommodation, older people, those who are homeless, or at risk of
homelessness, and those for whom purchasing a home is not an affordable option. The
benefits of new build housing in relation to health, wellbeing and educational attainment,
are well documented. New housing will also support our island communities and their
economies. A reduction in new build completions will have a negative impact on these
groups. 
Climate Change and Carbon 
4.5 New homes should have a low environmental impact, with the aim of reducing fuel use
and associated fuel costs. All projects within the SHIP will be delivered in accordance
with Building Standards regulations for energy efficiency. In addition, the majority of the
new projects incorporated into the plan will be delivered to Section 7, Silver Level, of
the 2019 Building Regulations in respect of Energy for Space Heating. Innovative
approaches to fuel efficient development will be considered on a site-by-site basis (e.g.
zero direct emissions heating systems, solar photovoltaic panels, smart technologies
etc). New Council homes contribute significantly to the Council’s Sustainability agenda.
New housing is more energy efficient, better ventilated, and has higher levels of thermal
comfort, which supports improved health and well-being. 
Key Priorities 
4.6 The provision of new affordable housing supports the Council Plan strategic priorities:
‘Wellbeing’; ‘Climate Change’; ‘A Sustainable Council’: and ‘Communities and Local
Democracy’. It supports the ambitions of the Council’s Regeneration Delivery Plan to
drive forward development on strategic regeneration sites, including town centres. 
There is also evidence that children and young people can benefit from improved
cognitive development and a reduction in behavioural issues through living in a more
attractive, warmer, and better ventilated environment and the provision of new
affordable housing also supports the Council Plan priority that children and young
people experience the best start in life. New housing will also support our island
communities and their economies. A reduction in new build completions will have a
negative impact on these groups. 
Community Wealth Building 
4.7 The delivery of the Strategic Housing Investment Plan, alongside investment in land
and asset maintenance, plays a key role in community wealth building. Effective use of
community benefit clauses in development contracts, and partnership work with
colleagues in Economic Development to support local construction and supply chain
companies to bid for this work, can secure many of these jobs for local people and
support the Council’s Community Wealth Building Strategy. For example, the contractor
for the Ayrshire Central, Irvine development will engage with local Primary schools,
secondary schools, colleges, the Council, and CEIS. They will assist with STEM events,
career events, mock interviews, CV advice, and arrange work experience. The
contractor will also engage with local community groups and assist them where
possible.   
135

Page 136

5. Consultation 
5.1 The Council has taken a collaborative approach to the preparation of the SHIP, and the
following stakeholders have been involved in the process: 
• ANCHO in partnership with Cairn
• Cunninghame Housing Association
• Riverside Scotland
• Link Group Ltd
• Trust Housing Association
• The Scottish Government
• North Ayrshire Council Officers (Economic Growth, Education, Finance, Housing,
Planning, Property Management and Investment, Active Travel & Transport, Roads,
and the Health and Social Care Partnership). 
5.2 Regular meetings are held with developing organisations, the Council and the Scottish
Government as part of the SHIP governance process. The meetings will continue to be
convened on a quarterly basis each year, to ensure that partners’ requirements are
identified, and the development programme delivered. 
DAVID W. HAMMOND
Executive Director (Communities and Housing) 
For further information please contact Fiona Ellis, Senior Manager, Housing Strategy and
Development, on 01294 324031. 
Background Papers
Local Housing Strategy 2023 – 2028
136

Page 137

Page 1
North Ayrshire Council   
Strategic Housing Investment Plan       
2025 to 2030  
137

Page 138

Page 2
Contents
Contents.................................................................................................................................................................................................................... 2
Introduction ............................................................................................................................................................................................................ 4
Strategic Policy Context ..................................................................................................................................................................................... 5
Equalities ........................................................................................................................................................................................................... 6
Childrens rights and wellbeing ........................................................................................................................................................................... 6
Environment ....................................................................................................................................................................................................... 7
Collaboration ...................................................................................................................................................................................................... 7
Investment Priorities .............................................................................................................................................................................................. 8
More homes at the heart of great places ........................................................................................................................................................... 8
Affordability and choice .................................................................................................................................................................................... 11
Affordable warmth and zero emissions ............................................................................................................................................................ 20
Improving the quality of our homes .................................................................................................................................................................. 21
Prioritising projects .......................................................................................................................................................................................... 25
SHIP funding streams .......................................................................................................................................................................................... 25
Affordable housing supply programmes ........................................................................................................................................................... 25
Reserves and balances ................................................................................................................................................................................... 26
Borrowing ......................................................................................................................................................................................................... 26
138

Page 139

Page 3
Affordable housing policy developer contribution ............................................................................................................................................. 26
Other funding sources ...................................................................................................................................................................................... 27
Council tax on second and empty homes ........................................................................................................................................................ 27
Planning and other regulatory matters ................................................................................................................................................................ 28
Delivery risks ....................................................................................................................................................................................................... 29
Amendments or additions to the plan .................................................................................................................................................................. 29
Development projects .......................................................................................................................................................................................... 30
Irvine & Kilwinning ........................................................................................................................................................................................... 30
Three Towns .................................................................................................................................................................................................... 31
North Coast ...................................................................................................................................................................................................... 32
Garnock Valley ................................................................................................................................................................................................. 32
Arran ................................................................................................................................................................................................................ 33
Progress update .................................................................................................................................................................................................. 34 
139

Page 140

Page 4
Introduction
The Strategic Housing Investment Plan 2025-2030 sets out the priorities for affordable housing investment in North Ayrshire over the next five
years and outlines how the Council and its partners will deliver these priorities. The focus of the plan is to support the Scottish Government’s
Affordable Housing Supply Programme (AHSP) to deliver affordable housing in North Ayrshire. 
The provision of new build housing has many benefits, including, helping to regenerate the area, providing sustainable housing solutions which
help to address fuel poverty and support educational attainment, and supporting the ageing population and people with accessible housing and
particular needs to live more independently.
The Council and its registered social landlord partners have experienced significant affordability challenges and pressures. The rate of inflation,
cost of borrowing, and rising material costs have significantly impacted upon construction costs and project viability. The recent reductions to the
Affordable Housing Supply Programme has further compounded these issues and meant that some schemes have had to be removed from the
programme, with other sites moved to a shadow programme to manage priorities within the currently
anticipated grant funding envelope.
Increasing standards and emerging legislation also impact upon project costs and timelines as options
appraisals and financial modelling are required prior to implementation. For example, the cost to
tenants and future maintenance and replacement costs of zero direct emissions systems had to be
reviewed with solutions considered on a site-by-site basis to ensure that they were affordable to install
and for tenants to utilise. The Council’s standard house types had to be revised to accommodate new
equipment to support the heating systems. Further implications are likely to be experienced as
Housing for Varying Needs and Building Standards are revised to enhance accessibility and
adaptability of housing stock. These changes are likely to impact upon the Council’s standard house
types and construction costs.
Development is not the only policy intervention being explored by the Council. It would be very difficult
for the Council and its partners to meet housing need only through investment in new homes. Work to
maintain and improve the condition of existing social housing stock, provide aids and adaptations and
improve the private rented sector are all intended to address the housing needs of the local population.
The Council and developing registered social landlord partners with stock in North Ayrshire all have
buyback programmes within the plan to increase affordable housing in the area and contribute to wider
regeneration and estate management.
140

Page 141

Page 5
Strategic Policy Context
Housing to 2040, Scotland’s first 20-year housing strategy, was announced in March 2021. The strategy committed to providing around £16bn of
investment to support the delivery of 100,000 new homes by 2032, with at least 70% for social rent. The Scottish Government’s Affordable Housing
Supply Programme comprises a range of funding mechanisms to enable affordable housing providers to deliver homes in communities across
Scotland to support local authorities’ Local Housing Strategies. The Scottish Government allocated Resource Planning Assumptions for the full
five-year period of the current parliament to deliver the ambitious affordable homes target set out in Housing to 2040. 
In May 2024, the Council was advised of reductions to the previously committed Resource Planning Assumptions which has had implications
particularly for larger projects which require an up-front funding commitment. The impact of the funding reduction has been considered through the
preparation of the Strategic Housing Investment Plan 2025-2030.
The Council’s Cabinet approved the latest Local Housing Strategy 2023-28 on 13 June 2023. The Local Housing Strategy sets out the Council’s
ambition:
‘We want all our people to live in the right homes, in great places, with access to any support services they need.”
The strategy mirrors the format of Housing to 2040 and sets out four overarching outcomes which align to the four key strategies in Housing to
2040 as detailed below. 
The Strategic Housing Investment Plan is an extension of, and aligns to, the Local Housing Strategy. In preparing the plan, the Council has referred
to the outcomes identified in the Local Housing Strategy, which support the objectives of the Council Plan. 
The Strategic Housing Investment Plan also aligns with the Council’s Community Wealth Building Strategy, which sets out how the Council, in
conjunction with communities and businesses, will build a strong local economy and address wealth inequality by supporting fair work, encouraging
local spend, and using the land and property we own.
141

Page 142

Page 6
Equalities
In line with the Council Plan,
fairness and equity is core to the
Strategic Housing Investment
Plan. It strives for a North Ayrshire
where everyone has the same life
chances to grow, prosper and
have fulfilling and healthy lives.
The Council Plan priorities are
detailed in figure 1. An Equality
Impact Assessment has been
undertaken for the Strategic
Housing Investment Plan. It found
that there are no negative or
discriminatory effects on any
equality groups.
The provision of new social
housing will have a positive impact
on those who require specialist
accommodation, older people,
those who are homeless, or at risk of homelessness, and those for whom purchasing a home is not an affordable option. The benefits of new build
housing in relation to health, wellbeing and educational attainment, are well documented. Public Health Scotland’s Healthy housing for Scotland
report recognises that adequate housing which is safe, accessible, available, appropriate and high quality is key to us achieving the highest
attainable standard of health.
Childrens rights and wellbeing 
The North Ayrshire Child Poverty Action Plan 2023 notes that North Ayrshire has the second highest level of child poverty of any area in Scotland.
Access to good quality and affordable housing is a key asset in addressing child poverty, and poverty overall. Research undertaken by Shelter
suggests children can benefit from improved cognitive development and a reduction in behavioural issues through living in a more attractive,
warmer, and better ventilated environment. All new build Council family homes have study space and private gardens.
142

Page 143

Page 7
Environment
A Strategic Environmental Assessment pre-screening
questionnaire undertaken confirmed that there would be no
likely significant adverse environmental effects from the
activities set out within the Local Housing Strategy (which are
not already subject to Strategic Environmental Assessment
elsewhere), and for this reason a full strategic environmental
assessment was not required. The likely environmental
impact of development proposals (both positive and adverse)
are scoped within the Strategic Environmental Assessment
for the North Ayrshire Local Development Plan.
Collaboration
As the strategic housing authority, the Council is committed
to supporting partners to deliver affordable housing
development within North Ayrshire. The Council adopts a
collaborative approach in the preparation of the Strategic
Housing Investment Plan. The key stakeholders listed below
have influenced the final programme.
Local registered social landlord partners, including ANCHO, Cairn, Cunninghame Housing Association, Link Group Ltd, Riverside
Scotland and Trust Housing Association
North Ayrshire Council services, including Economic Growth, Education, Finance, Housing, Planning, Property Management and
Investment, Active Travel and Transport, Roads, and the Health and Social Care Partnership
The Scottish Government
The Council and its partners engage with communities when developing new build sites in the Strategic Housing Investment Plan. For Council
projects, local residents are invited to review and comment upon the draft plans for the site. Thereafter the final plans are presented to the
community and local residents are also invited to ‘Meet the Builder’ when a contractor has been appointed. Following the completion of each new
site, design teams assess each project’s success in delivering places people can be proud of, as part of the ‘lessons learned’ review.
143

Page 144

Page 8
Developing the Strategic Housing Investment Plan
The priorities set out within the Strategic Housing Investment Plan were developed with partners and the local community through the preparation
of the Local Housing Strategy. 
Due to the current affordability challenges, the Council did not invite new site nominations for the plan from its registered social landlord partners.
Instead, the Council met with each developing RSL to discuss the progress towards the current programme and future development plans. All
existing developments were considered on their individual merits, with reference to the development priorities set out within the Local Housing
Strategy, deliverability, and any known constraints. Thereafter, the Council discussed the revised plan with partners. The Council will continue to
monitor the development programme and new opportunities at quarterly meetings with developing landlords and the Scottish Government.
Council Officers monitor the impact of the new build programme on education facilities and other services through the monthly Strategic Housing
Investment Plan project board. If any project becomes delayed or non-viable, the Council will work with registered social landlord partners and the
Scottish Government to ensure that new homes are delivered by accelerating other projects within the plan.
Continual improvement
The Council regularly meets the Scottish Government and partner landlords to review the progress of the Strategic Housing Investment Plan and
share good practice. The Council holds ‘lessons learned’ meetings and undertakes tenant satisfaction surveys for each site.
Investment Priorities
The Local Housing Strategy notes that the Strategic Housing Investment Plan will be reviewed annually to establish affordable housing investment
priorities for the Council and its partners which seek to address the key priorities established within the Local Housing Strategy, set out below.
More homes at the heart of great places
The places we live have a significant impact on wellbeing. High quality places are safe, provide access to services and can help to reduce isolation
and enhance communities. Place making principles form the foundation of project development, informing site selection (where appropriate) and
the design process. 
North Ayrshire has a diverse housing market comprising rural, urban and island communities. The Council has established six localities: 
144

Page 145

Page 9
Community Wealth Building & Fair Work First
The Council’s Community Wealth Building Strategy introduced a new model to develop resilient, inclusive local economies, with more local
employment and a larger and more diverse business base, ensuring that wealth is locally owned and benefits local people. Through the Strategic
Housing Investment Plan, contractors are expected to participate in the Council (or partners’) Community Benefits scheme, providing
apprenticeships to young people, skilling up the local workforce and supporting economic growth. Homes for Scotland suggests there are 4.1 jobs
created for every new home constructed. Effective use of community benefit clauses in development contracts, and partnership work with
colleagues in Economic Development to support local construction and supply chain companies to bid for this work, can secure many of these jobs
for local people.
The Council’s housebuilding programme can support the Council’s ambitions to encourage more young people into training and employment. The
North Ayrshire Local Employability Partnership Delivery Plan 2022 – 2026 sets out the intentions to help people of all ages to gain skills for
employment. It will prepare people for employment, training, education and/ or volunteering, with the aim of increasing qualification levels and job
prospects as well as reducing unemployment. Developing the Young Workforce have launched an online Skills Academy to support school leavers
and job seekers.
The Council’s Fair Work First Statement sets out the commitment to ensuring that fair
working practices are in place to support ‘Fair Work First’.
20-minute neighbourhoods
The provision of housing within 20-minute neighbourhoods allows people to meet their
needs locally and encourages active transport. The goal is to support a better quality of life
in places, whilst making towns and villages more resilient. The Strategic Housing
Investment Plan will prioritise new social housing developments which support the
principles of 20-minute neighbourhoods, where feasible.
Regeneration and town centres
Public sector investment can have a transformational impact for communities, and there
are cumulative benefits through considering how this can be coordinated with developing
partners and the private sector. The Council explores site and area specific opportunities
with partners to secure maximum regeneration benefits. This supports the ambitions of the
Council’s Regeneration Delivery Plan to drive forward place-based development on
strategic regeneration sites, including town centres.
145

Page 146

Page 10
Town centre regeneration is a primary focus of the Strategic Housing Investment Plan, with several projects completed to date within, or near, town
centres. The plan supports major housing led regeneration in North Ayrshire, an example being provision for the replacement of the 275 homes in
the Fullarton tower blocks which have been demolished in Irvine. Regeneration often results in higher development costs as sites require demolition,
refurbishment or have significant constraints/ abnormal costs.
The Strategic Housing Investment Plan also includes the provision of funding for 242 units to assist the delivery of Housing’s Estate Based
Regeneration Programme. This investment aims to provide new homes to replace any stock which requires to be demolished or reconfigured as
part of the Estate Based Regeneration Programme.
Island communities
The Council is committed to supporting island communities. General needs houses, amenity bungalows and homes for wheelchair users were
provided on the Isle of Cumbrae during summer 2021 (18 homes) and at Brathwic Terrace on the Isle of Arran during summer 2022 (34 homes). A
‘Local Lettings Initiative’ was introduced for Arran prior to the allocation of the new Council homes. 
The Local Lettings Initiative gives additional priority to island residents and key workers. Arran Development Trust has secured funding from the
Rural and Island Housing Fund to deliver 18 new affordable homes in Lamlash and Trust Housing Association is currently developing proposals
for a further 26 new homes in Brodick.  
The Council has established the Arran Housing Task Force to quantify demand for affordable housing on Arran and identify issues that may be
limiting economic growth. A quantitative study has been undertaken to determine affordable housing demand on the island, recognising the
assessed housing demand information from the North Ayrshire Housing Register and community feedback. The study is awaiting formal sign off
by the Taskforce and will be published thereafter. An action plan has been developed and three subgroups have been formed (funding, supply and
research) to address the report findings. The task force membership includes the Scottish Government, Highlands and Islands Enterprise, local
community groups and Arran registered social landlords.
146

Page 147

Page 11
A post has been funded for the Council’s Housing Strategy Team from the income from the reduction in discount for empty and second homes
Council Tax in North Ayrshire from April 2024 to support the work of the Arran Housing Task Force and the delivery of the group action plan. 
The Local Housing Strategy recognises that it is more expensive to build new homes on islands, compared to the mainland. Higher living, transport,
infrastructure, and fuel costs alongside limited on-island construction companies are identified as contributing factors to this issue. These issues
are being explored as part of the Community Wealth Building ambitions and Local Island Plans.
Green space
Research shows that where people have access to good quality outdoor green space, there is a corresponding positive and lasting impact on
public health. The Strategic Housing Investment Plan will prioritise new social housing developments which include the provision of outdoor green
space for residents.
Affordability and choice
Housing demand
The Local Housing Strategy has set a target of
1,625 new social housing units and a private
rented sector target of 1,300 new units. There
were 6,349 applicants on the North Ayrshire
Housing Register on 6 June 2024, of these,
3,575 applicants had an assessed housing need.
When transfer applicants are deducted 3,022
applicants remain (transfer applicants leave an
existing social tenancy behind for reallocation
when they are rehoused). Figure 1 details
housing register applicant needs. Please note
that the numbers are not mutually exclusive, for
example, applicants can request both amenity
and sheltered homes. 
3,575 applicants
with an assesed
housing need
215 requests for
wheelchair
accessible
homes 120 require
larger homes (6
people or more)
1,084 requests
for amenity
housing
412 requests
for sheltered
housing
346 homeless
applicants
64 require OT
assessed adapted
homes
Figure 1: Applicant Needs (Source: Housing Register June 2024)
147

Page 148

Page 12
Location
There is no limit to the number of letting areas applicants can select when making a housing application and demand has therefore been assessed
proportionately in Figure 2 to reduce double counting. It is important to note that individual housing allocations can impact upon demand within
areas. For example, if an applicant housed in the Three Towns also had Arran as an area of preference this would reduce demand for housing in
Arran.
Three Towns, Irvine and Kilwinning are the most pressured localities. Further analysis is required to determine housing pressures within the Arran
and Cumbrae localities as the proportionate analysis is not effective in determining pressure within smaller localities. 
This work is ongoing for Arran through
the Arran Housing Task Force,
previously referenced in the ‘Island
communities’ section of this document.
The demand for further new build
development on Cumbrae will be
considered annually as part of the
review of the Strategic Housing
Investment Plan.
The total number of homes which will be
developed over the lifetime of the
Strategic Housing Investment Plan have
been plotted by locality in figure 3.
These new supply figures illustrate the
aspiration to plan for a growing
population, and to seek continued
investment in housing stock to improve
overall stock condition. They have been
plotted alongside the net gain for the
same period, proportionate demand
from the housing register as at June
2024 and historic new build completions
from April 2013 to March 2024.  
148

Page 149

Page 13
Figure 3: Completions, net gain, proportionate demand, and historic completions 
The 'net gain' column indicates the additional homes available per locality following completion of the developments, minus the strategic demolitions
set out in the Strategic Housing Investment Plan.
Size
Applicant house size requirements are determined by the strategic bedroom need which is the minimum number of bedrooms required based on
household composition. The proportion of homes by bedroom size is noted by locality in Table 1 based on proportionate demand. 
149

Page 150

Page 14
Table 1: Proportionate housing demand by strategic bedroom need and locality (Source: North Ayrshire Housing Register, June 2024)
Analysis of the North Ayrshire Housing Register identifies demand trends for properties. House size has been identified by considering the minimum
accommodation size suitable for the household; this is referred to as the 'strategic bedroom need’.  
The strategic bedroom need is used for planning purposes only. Generally, one-bedroom homes are found to be of lower demand. Two-bedroom
homes are a more popular option for smaller households and are more flexible in meeting households’ future needs. An additional bedroom can
also provide study space, or space for home working. 
An indicative size mix (table 2) for developments across North Ayrshire has been prepared by uplifting the two-bedroom provision and reducing
the one-bedroom, thus meeting tenant aspirations and providing flexibility in terms of property sizes as households change composition over time.
Table 2: Altered demand by bedroom size (reflecting aspiration) and locality
This mix is intended as a guide only; each project will be considered on a site-by-site basis by the developing organisation, before being approved
by the Council.
The Council currently has plans to build four, five and six-bedroom homes for larger families within its development programme. The need for
further housing for larger families will be considered on a site-by-site basis as the housing mix is agreed for emerging projects.
Number of
Beds Arran Garnock
Valley Irvine Kilwinning North Coast Three Towns North Ayrshire
1 65% 57% 58% 56% 65% 60% 59%
2 13% 14% 15% 14% 12% 15% 14%
3 14% 18% 14% 16% 14% 13% 15%
4+ 8% 11% 13% 14% 9% 12% 12%
Number of
Beds Arran Garnock
Valley Irvine Kilwinning North Coast Three Towns North Ayrshire
1 13% 14% 15% 14% 12% 15% 14%
2 65% 57% 58% 56% 65% 60% 59%
3 14% 18% 14% 16% 14% 13% 15%
4+ 8% 11% 13% 14% 9% 12% 12%
150

Page 151

Page 15
Homelessness
North Ayrshire Council’s Rapid Rehousing Transition Plan was approved in 2019 and sets out how the Council and its partners will work together
to implement a housing led approach to meeting the needs of homeless households. Where it is not possible to prevent homelessness, the priority
is to secure a settled housing option for every homeless household as quickly as possible. The plan aligns with the housing supply priorities set
out within the Strategic Housing Investment Plan. The Rapid Rehousing Transition Plan priorities are to: 
The provision of new affordable housing which meets housing applicants needs and aspirations through the Strategic Housing Investment Plan
will continue to support the delivery of the Rapid Rehousing Transition Plan. The Council and its partners have also established the North Ayrshire
Homelessness Taskforce to review homelessness risk factors and inform homelessness prevention work. The groups findings will inform the new
North Ayrshire Homelessness Strategy which is being developed to align to the homelessness prevention duties set out within the proposed
Housing (Scotland) Bill 2024.
Gypsy/ travellers
The Council has not identified any additional demand issues in relation to accommodation for gypsy/ travellers. The Council has reviewed the
condition of the permanent site at Redburn Grove, Irvine in consultation with residents to identify any future maintenance and investment works.
An options appraisal is underway to develop plans and a business case for site improvements. The Council will make an application to the Scottish
Government to seek funding for any necessary renovation or improvements when this is complete.
Housing for key workers
The Council will work with its partners to make bids to the Scottish Governments five year £25m Rural Key Workers Housing Fund for appropriate
projects to provide affordable housing for key workers in rural areas. Trust Housing Association has already made a successful bid to the fund, to
acquire homes for key workers on Arran. The Arran Housing Task Force will continue to work collaboratively to identify and discuss potential
opportunities to utilise the fund.  
151

Page 152

Page 16
Ensuring best value
As part of the tendering process, the Council prepares minimum specifications for materials utilised in the new build developments to ensure that
they align to current lifecycle replacement and maintenance programmes. A suite of standard house types has also been developed to further
assist with maintenance programmes and reduce project design costs. 
The Council is committed to making efficiency savings through strategic procurement arrangements in the delivery of the new build affordable
housing programme, to ensure value for money for tenants. Several Strategic Housing Investment Plan projects have been procured through Hub
South-West, as part of a procurement strategy to achieve cost and time savings through economies of scale.  
The Council has also, with ten local authority partners, worked with Scotland Excel to develop a New Build Residential Construction Framework
Agreement available for use by all Scottish local authorities and registered social landlords. 
The Council has been utilising off site construction following a successful pilot scheme at Ardrossan Road, Seamill. During 2023, six new amenity
bungalows were developed in Stevenston town centre. A further 14 homes are expected to be delivered by early 2025 at Laburnum Avenue in
Beith and Newhouse Drive in Kilbirnie. The construction method results in less waste and has sustainability benefits. It also reduced the construction
time on site, and in turn, reduced disruption for local residents and businesses from site traffic and works.
152

Page 153

Page 17
Figure 4: Afton Court development of six amenity bungalows utilising off site construction in Stevenston town centre 
Rent levels and affordability 
The Scottish Housing Regulator expects social landlords to be able to demonstrate affordability and engage meaningfully with tenants on rent
increases. Increasing costs and inflation mean that retaining affordable rent levels is a significant challenge for the Council and its partners.
The Council is committed to working with its partners to find sustainable routes out of poverty for children and their families. The Council Plan 2023-
28, has addressing inequalities at its core, and aims for “a North Ayrshire that is fair for all”. Budget decisions directly align to Council Plan
priorities. The most recent Year End Progress Reports for 2023-24 demonstrate the impact of the action taken across services and with partners
to address inequalities and inequity in North Ayrshire.  
In August 2024, the Council’s Cabinet approved the publication of the Child Poverty Action Plan Report 2023-24, which shows progress against
the Child Poverty Action Plan 2023-26, aligned to Scotland’s Child Poverty Plan “Bright Start, Better Futures 2022-26”. The progress report
highlights action that has been taken throughout 2023 and 2024, based on the three key drivers of child poverty - income from employment, income
from social security and the cost of living. This action has been informed by consultation with residents and their community groups, ensuring real
lived experience informs the approach. The Council is continuing to align delivery to target the six priority families as outlined in the national plan.  
153

Page 154

Page 18
Empty homes and second home buy backs
Empty homes are detrimental to the local environment, often the target of antisocial behaviour, and are more likely to fall into disrepair. The Council
and its partners recognise that bringing former social housing stock into ownership can assist with housing management and maintenance issues
and increase housing available through the North Ayrshire Housing Register. 
All developing registered social landlord
partners with stock in North Ayrshire now
have provision for buyback programmes
within the Strategic Housing Investment
Plan. 
The Council has acquired four empty
homes over the past four financial years
which have been brought back into use as
Council stock. Table 3 details the number of
empty homes brought back into use in
North Ayrshire from April 2020 until March
2024, all of these homes were subject to
the Council Tax levy (this is where the
Council currently focuses empty homes resources).  A post has been funded for the Council’s Private Sector Advice Team from the reduction in
discount for empty and second homes Council Tax in North Ayrshire since April 2022 to focus on bringing empty homes back into use. 
Table 3: Empty homes brought into use per annum 2020/21 to 2023/24 
Duration empty Under 6 months 6 to 12 months 1 to 2 years 2 to 5 years 5 to 10 years 10+ years Total
2020/21 35 61 15 10 0 0 121
2021/22 18 71 136 109 0 0 334
2022/23 23 3 31 64 2 0 123
2023/24 259 66 5 39 9 0 378
154

Page 155

Page 19
Private sector support
The Council’s Private Sector Advice Team provide advice on private sector housing issues in North Ayrshire. The service is part of the revised
Scheme of Assistance 2019 which introduced a range of new measures to improve private sector housing condition, including: 
A ‘pre-tenancy support service’ for landlords to aid the prevention of future property condition issues. 
A ‘missing shares scheme’ to remove barriers where a property owner refuses to meet their common repair obligations. 
Use of the Council’s powers for Compulsory Purchase Orders (CPOs) where appropriate to acquire empty properties in poor
condition, bringing them back into mainstream housing stock. 
An Empty Homes Loan Fund to assist property owners to bring properties back into effective use. 
Second homes
The Council’s Local Housing Strategy notes that there are 1,500 second homes in the area, almost all of which are located on the islands. On
Arran, 25% of privately owned houses are second homes; on Cumbrae this rises to 43%. This reduces the number of homes available for local
people, and in turn pushes up house prices and private rent charges. 
The Council is currently undertaking a community consultation on proposals to implement an additional Council Tax levy on second homes from 1
April 2025.
Alternative models of affordable housing delivery
The Council and our partner registered social landlords will continue to review alternative housing models which could be utilised to increase
affordable housing supply during the lifetime of the Strategic Housing Investment Plan.
155

Page 156

Page 20
Affordable warmth and zero emissions
Sustainability
The Council’s Sustainable North Ayrshire Strategy 2024-2027 includes
actions to achieve net-zero carbon emissions by 2030. New housing
has a key role to play in carbon reduction, climate change mitigation,
and alleviation of fuel poverty.
The Council and its partners will continue to consider innovative and
sustainable approaches to heat and power, such as low carbon heat,
solar photovoltaic panels and smart technologies. The Council will
ensure that all new build housing utilises Net Zero Direct Emissions
heating systems in accordance with building standards. In advance of
the new regulations the Council installed three biomass district heating
schemes in Stevenston, Dalry and Largs. A bespoke energy strategy
has been created for each emerging new housing development to
ensure that the heating options for the sites are both energy efficient
and affordable for tenants. 
The Council recognises that a ‘fabric first’ approach to sustainability can provide
benefits to tenants, in terms of reducing heating costs. It also benefits the
environment as all homes are designed to minimise heat loss.
The Council completed two ‘sustainable demonstrator homes’ within Dickson
Drive, Irvine in 2020 to highlight best practice in design and innovation, ensuring
benefits from sustainable technologies are maximised. 
Also, in recognition of the safety benefits of sprinkler systems, the Council
installed sprinklers in all new build housing proposals which reached technical
design stage after October 2019, prior to the introduction of Building Standards
legislation in March 2021.
156

Page 157

Page 21
Secure by design
Successful design can contribute to community stability and promote feelings of safety and inclusion. All Council developments are planned utilising
‘secure by design’ principles.
Active Travel
Access to safe walking networks, cycle pathways and public transport connects communities
to local amenities and services. In turn, these can result in direct health benefits, through
increased physical activity and reduced air pollution. They can also lead to indirect health
benefits by providing improved access to opportunities for employment, leisure, and
healthcare services.
The sustainable travel hierarchy, illustrated in figure 5 opposite, sets out the transport
priorities for sustainable transport in development.
Improving the quality of our homes
Over 40% of the stock developed by the Council and its partners since April 2013 has
addressed particular housing needs, demonstrating the commitment to supporting tenants to
live independently. The cost of particular needs housing is often more expensive than general
needs housing, for example, housing for wheelchair users has a larger ground floor footprint,
increasing construction costs and reducing economies of scale as site densities are reduced.
Similarly, supported accommodation and sheltered housing require communal space which also increases costs.
Wheelchair accessible accommodation 
All amenity and sheltered housing in North Ayrshire should be built to an ambulant housing standard as a minimum. To ensure need is met now
and in the future, the new Local Housing Strategy increased the target to ensure at least 10% of all tenure new build stock is suitable for wheelchair
users (increased from 7% in the previous strategy). In recognition of the benefits of providing adaptable housing, and to address demand from the
North Ayrshire Housing Register, the Council and registered social landlord partners developed 189 (11% of new supply) new build homes suitable
for wheelchair users since April 2013. The Strategic Housing Investment Plan 2025 – 2030 estimates the delivery of a further 160 (14% of new
supply) homes suitable for wheelchair users. 
In addition, a set of standard house types for Council developments were designed in partnership with Housing Services Occupational Therapists
which are of an accessible design to make best use of assets and adapt to tenants’ changing mobility needs.
157

Page 158

Page 22
In preparing North Ayrshire’s third Local Development Plan, the
Council will further consider the housing needs of older people and
disabled people in the area and the establishment of an
appropriate target for the delivery of accessible or adaptable
homes, including wheelchair housing and intergenerational
homes within the private sector, to support independent living
particularly although not exclusively among older or disabled
people. 
The Government has committed to a new ‘Scottish Accessible
Homes Standard’ which will be part of national building standards
by 2025/26, and in turn increase the provision of accessible
homes in the private sector. The accessible standard will see
accessibility designed and built into all new homes, increasing the
housing choices for people with disabilities and reducing the need
for expensive retrofitting as people age or their needs change.
Occasionally it may be necessary to build larger specialist housing to meet the specific needs of individual households. Where this is provided by
a registered social landlord, the Council will approve the proposals before a planning application is submitted.
Supported accommodation
Officers within the Place Directorate and the Health and Social Care Partnership developed a new supported accommodation housing model which
has been implemented at sites across North Ayrshire. 
The focus is on maximising independence for adults within a homely setting, who require a higher level of support, and who are living with learning
disabilities, or mental illnesses (all ages), or who are under 65 years and have physical disabilities. The new supported accommodation model can: 
The Strategic Housing Investment Plan has supported the Health and Social Care Partnership to meet specialist housing need through four
dedicated supported accommodation projects which have provided 62 (4% of new supply) new homes across North Ayrshire.
158

Page 159

Page 23 
Housing for older people
The Local Housing Strategy recognises that the proportion of
older people in North Ayrshire is higher than that of Scotland as
a whole (23% compared to 19%). It further predicts that by
2043 the over 75 age group will account for 28% of local
people.
Recognising the need to develop housing solutions appropriate
for the older population, the Council and its partners have
delivered 334 (19% of new supply) amenity homes and 251
(14% of new supply) units of sheltered housing since April
2013. The Council ensures that its sheltered housing is
developed utilising dementia friendly design principles. The
Strategic Housing Investment Plan 2025 – 2030 estimates the
delivery of a further 236 (21% of new supply) amenity homes.
Alongside the new build programme, the Council will continue
to deliver its sheltered housing re-provisioning programme,
which includes £38m investment in the refurbishment of
sheltered housing units out with the Strategic Housing
Investment Plan.
159

Page 160

Page 24
Extra care housing
Housing Services and the Health and Social Care Partnership worked together over the last few years to develop a model for Extra Care Sheltered
Housing. The vision was to create safe, affordable homes for tenants who require additional support, with extra services to promote independent
living, such as assistance with meals or welfare checks, to be available to tenants for an additional fee. 
Following development of the outline model, demand analysis was undertaken by the Health and Social Care Partnership in 2021 alongside
engagement with other areas in Scotland where similar housing models operate. At that time, it was determined as an outcome of the analysis that
there was not sufficient demand to integrate the extra care model into a new sheltered housing complex. The Council has, however, incorporated
flexibility into some new build sheltered complexes to allow this model to be reconsidered in the future should the Health and Social Care
Partnership choose to develop this further.
Assistive technology
The Flatt Road development in Largs provides an exemplar for assistive technology to promote independent living. Features that can be installed
within the sheltered housing complex and supported accommodation, where required, to support tenants’ individual needs include:
160

Page 161

Page 25 
Prioritising projects 
All projects which meet the criteria outlined above will be ‘high priority’. In the case of developments by registered social landlords the housing mix
and type for each individual development site and the proposed rent levels for the new homes should be formally agreed with the Council prior to
the submission of a planning application.
Due to the funding reductions, existing projects have had to be prioritised based upon deliverability, strategic alignment, value for money, and their
impact upon community regeneration in order to align with the grant funding envelope currently available. Projects which cannot be supported in
the main programme, due to the current anticipated funding envelope, have been moved to a shadow programme which will be accelerated, should
slippage occur in the main programme, and/or if additional funding becomes available.
SHIP funding streams
Affordable housing supply programmes
The main SHIP programme is based upon assumed grant funding of £71.573m for North Ayrshire from April 2024 to March 2030 (see table 4).
Funding for Council projects in the main programme not yet at tender stage has been assumed at benchmark plus annual Scottish Social Housing
Tender Price Index inflation which has been assumed at 3.1% per annum. The Council projects in the SHIP shadow programme have grant funding
161

Page 162

Page 26
set at levels which will allow the schemes to be wholly funded with borrowing costs offset by rental income. The Council will seek grant funding
above these levels on a site-by-site basis, as required. The registered social landlord funding rates have been included as requested by each
developing organisation and will be subject to Scottish Government authorisation.     
The sites within the SHIP shadow programme will assist the Council to meet the requirement for ‘slippage’ in accordance with Scottish Government
guidance. The slippage requirement is to ensure that the allocation is fully spent even if delays or constraints emerge on other development sites,
and to provide the opportunity for North Ayrshire to absorb slippage from other local authority areas.
Table 4: North Ayrshire Resource Planning Assumption (RPA) per annum 2024/25 and assumptions for 2025/26 to 2029/30 (£m) 
Reserves and balances
All developing organisations will utilise available reserves and balances to support the development programme.
Borrowing
A large portion of development funding is secured from borrowing. Private finance supports registered social landlords development programme,
and prudential borrowing supports local authority new build projects.
Affordable housing policy developer contribution 
The Council’s previous Affordable Housing Policy (RES4), which required contributions to affordable housing provision from specified private
developments within North Ayrshire, was removed within the new Local Development Plan (LDP2) adopted on 28 November 2019.  
Developer contributions, in the form of commuted sums, received through the application of the Affordable Housing Policy under the previous Local
Development Plan, will be utilised to fund projects being delivered through the Strategic Housing Investment Plan, when required.
The Council had an on-site contribution through the affordable housing policy at the 31-unit Ardrossan Road, Seamill development. Table 5 details
the number of units supported per annum and the value of these contributions. All projects supported were delivered as part of the Affordable
Housing Supply Programme.
Financial Year  2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 Total
RPA £12.173 £11.880 £11.880 £11.880 £11.880 £11.880 £71.573
162

Page 163

Page 27
Table 5: Projects supported by developer contributions April 2020 to March 2024
Financial Year 2020/21 2021/22 2022/23 2023/24 Total
Number of units supported 0 0 34 34 34*
Funding value 0 0 £47,500 £18,750 £66,250
As at 31 March 2024 the Council had £0m of funding from developer contributions in hand. The Council will utilise any other incoming funds to
support Council projects within the Strategic Housing Investment Plan and partner developments, where appropriate.
*Please note that the project supported spanned two financial years so the total number of units was 34.
Other funding sources
The Council will consider utilising other funding sources to support the Strategic Housing Investment Plan, where appropriate. The Council
successfully secured £0.6m from the Scottish Government’s Low Carbon Vacant and Derelict Land Investment Programme to support the King’s
Arms, Irvine town centre regeneration project. The Council will make applications to the Housing Infrastructure Fund to support the Montgomerie
Park, Irvine and James Reid, Saltcoats sites.
Council tax on second and empty homes
The Council is currently undertaking a community consultation on proposals to implement an additional Council Tax levy on second homes from 1
April 2025. Income received from the reduction in discount for empty and second homes in North Ayrshire is held in the Council’s Affordable
Housing Account. Table 6 details the number of units supported per annum and the value of these contributions. All projects supported were
delivered as part of the Affordable Housing Supply Programme. The account also funds two posts as detailed within the ‘Island communities’ and
‘Empty homes and second home buy backs’ sections above. 
Table 6: Projects supported by Council Tax on empty and second homes April 2020 to March 2024
Intentionally blank 2020/21 2021/22 2022/23 2023/24 Total
Number of units supported 191 469 321 539 1,267*
Funding from Council Tax levy on
second homes and empty homes £1,252,078 £2,024,139 £541,320 £1,147,139 £4,964,676
*Please note that a number of the projects supported spanned two financial years so the total number of units was 1,267.
163

Page 164

Page 28
As at 31 March 2024 the Council had £1.925m of funding from the Council Tax levy on second and empty homes and an estimated annual income
of £1.034m. The Council will utilise the funds to support Council projects within the Strategic Housing Investment Plan and partner developments,
where appropriate.
Planning and other regulatory matters
In 2014, the Council’s Cabinet approved the House Building Protocol, to be used in
all Council housing development projects that meet the criteria for permitted
development. Class 33 of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992, as amended, enables local authorities to carry
out works, within their district, for the erection of dwellings so long as the development
conforms with the Local Development Plan.
In 2019, it was agreed that all future Council housing developments progressed as
permitted development will be required to obtain a ‘Certificate of Lawfulness’ from the
Council’s Planning Service. This will certify that each site within the SHIP has been
considered against the full terms of the adopted Local Development Plan. Housing
development proposals by the Council which do not fall within the scope of permitted
development, including schemes which require an Environmental Impact Assessment
(EIA) will require planning permission. Proposals over 0.5 hectares in area will require
to be screened for the purposes of EIA. 
164

Page 165

Page 29
Delivery risks
Through experience, and engagement with registered social landlords and other developers,
development constraints or risks to delivery of the programme have been identified as:
• Inflation of building costs and rising tender prices
• Shortages of materials
• Capacity within the building and development industry across the country
• Costs of infrastructure and ground remediation
• Delays obtaining statutory utility consents
• Emerging costs relating to legislative and building standards regulations amendments
• Availability of grant funding
The Council and its partners will continue to work closely to monitor and actively manage these
risks through the period of the Strategic Housing Investment Plan. 
Amendments or additions to the plan
The delegated authority to accelerate any project detailed within the main SHIP programme is held by the Executive Director (Communities and
Housing) and the Cabinet Member for Communities and Islands.
North Ayrshire Council Cabinet approval will be required to accelerate projects within the SHIP shadow programme or for the addition of any new
projects to the plan. 
165

Page 166

Page 30
Development projects
An overview of projects detailed in the Strategic Housing Investment Plan tables is provided below by locality.
Irvine & Kilwinning 
Project Estimated timeline Site Information
Stanecastle, Irvine
(NAC) 
31 units
Site start: 25 March 2024
Expected completion: 
Autumn 2025
Work is underway to deliver a mix of general needs, amenity, and wheelchair user
accommodation on the site of the former Stanecastle School.
King’s Arms, Irvine
(NAC)
6 units
Site start: 13 May 2024
Expected completion: 
Winter 2025
Works have commenced on site to regenerate a prominent town centre building to deliver
six amenity flats, retaining the original building façade.
Ayrshire Central, Irvine
(NAC)
202 units
Site start: 4 November 2024
Expected completion: 
Winter 2027
Work is underway on this site, which is in a high demand area, to deliver a mix of general
needs, amenity, and wheelchair user properties.  
Montgomerie Park,
Irvine (NAC)
188 units
Site start: Spring 2026
Expected completion: 
Spring 2029  
This development will provide a mix of general needs, amenity, and wheelchair user
accommodation. The site forms part of a wider masterplan area comprising private
development, affordable housing, a new school, and new retail provision.  
Fullarton Street, Irvine
(NAC) 
43 units
Site start: Summer 2026
Expected completion: 
Summer 2028
This project will redevelop the site of the former Irvine high flats which have now been
demolished. The centrally located site will deliver a mix of general needs, amenity, and
wheelchair user accommodation.
Corsehillhead,
Kilwinning (NAC)
7 units
Site start: Summer 2027 
Expected completion: 
Autumn 2028
This development will provide a mix of general needs, amenity, and wheelchair user
accommodation in Kilwinning. The site will complete the redevelopment of the former
school site where two previous phases of social housing have been developed.  
St Michael’s Wynd,
Kilwinning (NAC)
46 units
Site start: Autumn 2027 
Expected completion: 
Spring 2029
The project will deliver a mix of general needs and amenity accommodation in the Corsehill
area of Kilwinning. An options appraisal is required for this site to review its financial
viability.
Bourtreehill Village,
Irvine (NAC)
32 units
Site start: Autumn 2028 
Expected completion:  Autumn
2029
The site will see the regeneration of the Bourtreehill Village area of Irvine. The site is
expected to deliver new retail provision and 32 new homes.  
166

Page 167

Page 31
Project Estimated timeline Site Information
Redburn Place, Irvine
(Cairn) 
10 units
Site start: Autumn 2025
Expected completion: 
Autumn 2026
This development will provide general needs, amenity, and wheelchair accommodation.
This site was formerly known as Confidential Site 1.
Confidential site 3
(Cairn) 
4 units
Site start: Spring 2027
Expected completion: 
Spring 2028
This site has the capacity for 4 affordable, general needs homes.  This site is currently
confidential due to a requirement for planning consent and for acquisition of land. 
Confidential site 12,
Kilwinning (CHA) 
25 units
Site start: Spring 2026
Expected completion: Spring
2027
The 92 unit former ‘unallocated block’ has been reduced to 25 units and a site has been
identified within Kilwinning which remains confidential whilst project viability is assessed. 
Bank Street, Irvine
(CHA)
16 units
Site start: Spring 2027
Expected completion: 
Spring 2028
This town centre regeneration project in Irvine aims to provide 16 new homes for
affordable rent.
Regeneration project
3, Kilwinning
(Riverside) 
30 units
Site start: Spring 2028
Expected completion: 
Spring 2030
This project involves the regeneration of 30 properties to deliver a mix of general needs
houses, amenity properties and homes suitable for wheelchair users. The location has still
to be finalised. 
Three Towns
Project Timeline Site Information
James McFarlane,
Ardrossan (NAC)
19 units
Site start: 25 March 2024
Expected completion: 
Summer/autumn 2025
The Council is currently redeveloping the former James McFarlane school to provide
general needs, amenity, and homes suitable for wheelchair users. The site is located close
to Ardrossan town centre. 
Nursery Place (Regen
1e), Ardrossan (NAC)
6 units
Site start: Spring 2026
Expected completion: 
Spring 2027
This Estate Based Regeneration Programme redevelopment will see 12 properties in
Ardrossan demolished to be replaced with approximately six new affordable homes. 
Grange Court,
Stevenston (NAC)
6 units
Site start: Spring 2026
Expected completion: 
Spring 2027
This Estate Based Regeneration Programme redevelopment will see 16 properties
demolished near Stevenston town centre to be replaced with approximately six new
affordable homes.
James Reid, Saltcoats
(NAC)
46 units
Site start: Summer 2027
Expected completion: 
Early 2029
The site of the former James Reid school and the former Focus Centre will provide general
needs, amenity, and wheelchair accommodation. Issues with a culvert are impacting
Scottish Water approval, options are being reviewed to resolve this matter.
167

Page 168

Page 32
Project Timeline Site Information
Regeneration Project
1d, Ardrossan (NAC)
36 units
Site start: Early 2028
Expected completion: 
Winter 2029
This project provides a regeneration opportunity for 36 affordable homes, comprising
general needs, amenity, and wheelchair user accommodation. 
Garven Road,
Stevenston (CHA)
20 units
Site start: 25 September 2023
Completion: 
1 October 2024
This site has delivered 20 new general needs, amenity, and wheelchair user homes.
Sharphill Phase 5,
Saltcoats (CHA)
100 units
Site start: Winter 2028
Expected completion: Spring
2030
The next phase of the Sharphill site will deliver an additional 100 new homes, providing a
mix of general needs, amenity, and wheelchair user homes. The scheme has been paused
whilst the financial viability is assessed.
Confidential Site 10,
Ardrossan (CHA) 
50 units
Site start: Spring 2029
Expected completion: 
Winter 2030
This project has capacity for up to 50 homes and is confidential until site feasibility can be
confirmed.
Parkend Gardens,
Saltcoats (Link)
12 units
Site start: Early 2029
Expected completion: 
Early 2030
This development is in close proximity to Saltcoats town centre and adjacent to the
Council’s Kyleshill Court. It will deliver a mix of general needs, amenity and wheelchair
accommodation. The financial viability of the scheme is currently being assessed.
North Coast
Project Timeline Site Information
Former St Mary’s
Primary, Largs (NAC)
26 units
Site start: 15 January 2024
Expected completion: 
Early 2025
Works are well advanced at the former school site which will deliver general needs houses
and amenity properties.  
Nelson Street, Largs
(NAC)
3 units
Site start: 15 January 2024
Expected completion: 
Early 2025
This site will see empty homes refurbished at the site which is in close proximity to Largs
town centre.
Garnock Valley
Project Timeline Site Information
Newhouse Drive,
Kilbirnie (NAC)
7 units
Site start: 15 January 2024
Expected completion: 
Early 2025
Low demand flatted accommodation has been demolished and work is well advanced to
deliver 7 new affordable homes on the Kilbirnie site. Modular construction was utilised to
reduce the time on site and the impact of works on surrounding residents and businesses.  
168

Page 169

Page 33
Project Timeline Site Information
Laburnum Avenue, Beith
(NAC)
7 units
Site start: 15 January 2024
Expected completion: 
Early 2025
Low demand flatted accommodation has been demolished and work is well advanced to
deliver 7 new affordable homes on the Beith site. Modular construction was utilised to
reduce the time on site and the impact of works on surrounding residents and businesses.  
Former Garnock
Academy, Kilbirnie (NAC)
50 units
Site start: 17 June 2024
Expected completion: 
Early 2026
Work is underway at the site of the former Garnock Academy to deliver a mixture of
general needs homes, amenity bungalows and homes suitable for wheelchair users. 
Arran
Project Timeline Site Information
Springbank, Brodick
(Trust HA)
26 units
Site start: Winter 2025
Expected completion: 
Autumn 2027
Trust Housing Association are exploring the viability of developing 26 homes at this Brodick
site. This site was formerly known as Confidential Site 4. The access point for this
development should be agreed with NAC Roads as the existing road network may not cope
with the additional units 
169

Page 170

Page 34
Progress update
The Council has made a commitment to develop 1,643 new homes by 2030. Good progress has been made towards achieving this target, with
885 new Council homes built as at 31 March 2024. The tables below detail the Council and its partners progress to date (excluding sites which
are noted for completion during 2024/25 within the Strategic Housing Investment Plan 2025 – 2030).
Table 7: Social housing new build completions by locality and financial year
Locality Pre 2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Total
Arran 56 0 0 0 19 15 0 90
Garnock Valley 24 0 0 49 0 0 0 73
Irvine 250 0 111 0 83 35 113 592
Kilwinning 68 64 0 0 24 127 0 283
North Coast 85 26 58 0 141 29 12 351
Three Towns 84 126 0 28 105 16 30 389
Total Units 567 216 169 77 372 220 155 1,778 
Table 8: Social housing new build completions by type
House type General
needs
Amenity
housing
Sheltered
housing
Supported
accommodation
Wheelchair
user
Ground
floor living
(wheelchair
user)
Other
adapted Other
New
Supply
Shared
Equity
(NSSE)
Total
Units 958 334 251 62 90 49 10 8 16 1,778
Percentage 53.9% 18.8% 14.1% 3.5% 5.1% 2.7% 0.6% 0.4% 0.9% 100%
It should be noted that 50 of the amenity, sheltered and supported accommodation units detailed above are suitable for wheelchair users.
170

Page 171

Page 35 
Completed North Ayrshire
Council projects Locality General
Needs Amenity Sheltered Supported Wheelchair
User 
Ground
Floor
Living
Other Total
Units
Completion
year
Copeland Crescent, Millport North Coast 0 11 0 0 1 0 0 12 2013/14
Redstone Avenue, Kilwinning Kilwinning 37 3 0 0 2 4 0 46 2014/15
John Galt PS, Irvine Irvine 64 10 0 0 6 0 0 80 2014/15
Stevenston Institute, Largs North Coast 0 11 0 0 0 0 0 11 2015/16
Dickson Drive, Irvine Irvine 6 2 0 0 0 0 0 8 2015/16
Kiln Court, Irvine Irvine 0 0 16 0 0 0 0 16 2015/16
Montgomery Court, Kilbirnie Garnock Valley 0 8 16 0 0 0 0 24 2016/17
Fencedyke, Irvine Irvine 19 10 0 0 3 3 0 35 2017/18
Glencairn House, Stevenston Three Towns 0 0 28 0 0 0 0 28 2018/19
Canal Court, Saltcoats Three Towns 0 0 36 0 0 0 0 36 2018/19
Ardrossan Road, Seamill North Coast 25 5 0 0 1 0 0 31 2019/20
Dickson Drive, Irvine  Irvine 14 3 0 0 4 3 0 24 2019/20
Watt Court & Dalry Primary  Garnock Valley 0 8 22 15 0 0 4 49 2020/21
Dalrymple Place, Irvine Irvine 0 0 24 0 9 0 0 33 2021/22
St Beya, Cumbrae North Coast 3 9 0 0 3 3 0 18 2021/22
Springvale, Saltcoats Three Towns 6 2 0 0 2 4 0 14 2021/22
Flatt Road, Largs North Coast 49 16 28 22 5 2 1 123 2021/22
Towerlands, Irvine Irvine 20 12 0 0 5 13 0 50 2021/22
Brathwic Terrace, Arran Arran 17 8 0 0 2 7 0 34 2022/23
St Michael's Wynd, Kilwinning Kilwinning 34 2 24 10 2 6 1 79 2022/23
St Colm's Place, Largs North Coast 0 0 29 0 0 0 0 29 2022/23
Caley Court, Stevenston Three Towns 0 0 0 15 0 0 1 16 2022/23
Harbourside, Irvine Irvine 24 10 28 0 4 4 1 71 2023/24
Afton Court, Stevenston Three Towns 0 6 0 0 0 0 0 6 2023/24
Largs Police Station North Coast 0 12 0 0 0 0 0 12 2023/24
Total  Locality 318 148 251 62 49 49 8 885 Completion
Year
171

Page 172

Page 36
Arran Development Trust has also secured funding from the Rural and Island Housing Fund to deliver 18 new affordable homes in Lamlash as
detailed in table 9 below.
Completed Registered Social
Landlord projects Locality General
needs Amenity Wheelchair Other
adapted NSSE Total
units
Completion
Year
Flatt Farm, Largs (CHA) North Coast 16 10 0 0 0 26 2013/14
Vineburgh Phase 3, Irvine (CHA) Irvine 43 10 0 0 10 63 2013/14
Jetty Road, Fairlie (CHA) North Coast 10 3 0 0 0 13 2014/15
Benlister Road, Lamlash (Riverside) Arran 50 0 0 0 6 56 2014/15
Vineburgh Phase 4, Irvine (CHA) Irvine 41 6 1 0 0 48 2014/15
Pennyburn, Kilwinning (Riverside) Kilwinning 21 0 1 0 0 22 2015/16
Waterside Street, Largs (CHA) North Coast 0 12 0 0 0 12 2015/16
Seamore Street, Largs (CHA) North Coast 8 3 0 0 0 11 2016/17
Ardrossan Harbour Phase 1 (CHA) Three Towns 55 13 2 0 0 70 2017/18
New Street, Stevenston (CHA) Three Towns 7 7 0 0 0 14 2017/18
Nelson Street, Largs (CHA) North Coast 7 5 2 0 0 14 2018/19
Corsehillhead, Kilwinning (CHA) Kilwinning 57 5 2 0 0 64 2018/19
Ardrossan Harbour Phase 2 (CHA) Three Towns 2 4 4 0 0 10 2018/19
Sharphill Phase 3, Saltcoats (CHA) Three Towns 19 3 2 0 0 24 2018/19
Stanley P.S., Ardrossan (CHA) Three Towns 24 2 2 0 0 28 2018/19
Victoria Hotel, Largs (CHA) North Coast 0 12 0 0 0 12 2018/19
Balnagowan, Skelmorlie (CHA) North Coast 25 0 2 0 0 27 2019/20
Tarryholm Phase 1, Irvine (Riverside) Irvine 61 14 2 10 0 87 2019/20
Ardoch Court, Stevenston (CHA) Three Towns 26 0 2 0 0 28 2020/21
Corrie Crescent (Charitable Bond) (CHA) Three Towns 12 1 0 0 0 13 2021/22
Glebe, Saltcoats (CHA) Three Towns 0 0 2 0 0 2 2021/22
Sharphill Phase 4, Saltcoats (CHA) Three Towns 65 5 6 0 0 76 2021/22
West Byrehill, Kilwinning (CHA) Kilwinning 59 8 5 0 0 72 2022/23
Tarryholm Phase 2, Irvine (Riverside) Irvine 32 40 5 0 0 77 2023/24
Green Street, Saltcoats (CHA) North Coast 0 23 1 0 0 24 2023/24
Total Locality 640 186 41 10 16 893 Completion
Year
172

Page 173

Page 37
Table 9: Community housing new build completions
Project Locality Developer Tenure General Needs Other Total Units Completion Year
Rowarden, Lamlash Arran Arran Development Trust Affordable private rent 18 0 18 2024/25 
173

Page 174

Official‐Protect#
CONFIDENTIAL DRAFT SHIP 2025‐2030
Pre 2025/26
2025/26
2026/27
2027/28
2028/29
2029/30
2024/25
2025/26
2026/27
2027/28
2028/29
2029/30
General
Needs
Amenity
Supported
W
heelchair
Ground
Floor
Sheltered
Afton Court Stevenston NAC ‐ New Build ‐ ‐ ‐ £90,678 £0 £90,678 £0 £0 £0 £0 £0 £0
Buy Backs 2023/2024 ! NAC ‐ Buy Back 01 Apr 23 31 Mar 24 ‐ £213,863 £0 £213,863 £0 £0 £0 £0 £0 £0
Buy Backs (Ukraine) 2023/2024 ! NAC ‐ Buy Back 14 Nov 23 31 Mar 24 ‐ £1,927,200 £0 £1,927,200 £0 £0 £0 £0 £0 £0
Refurbishment Project 8 Irvine TBA NAC ‐ Refurb ‐ ‐ ‐ £0 £0 £0 £0 £0 £0 £0 £0 £0
Glebe Place Saltcoats X: 224700 Y: 641700 NAC ‐ New Build ‐ ‐ ‐ £0 £0 £0 £0 £0 £0 £0 £0 £0
cost overruns Sharphill 4 CHA ‐ New Build ‐ ‐ ‐ £295,858 ‐ £295,858 £0 £0 £0 £0 £0 £0
Unallocated Regeneration Block TBA TBA NAC ‐ New Build ‐ ‐ 2025/26 £0 £0 £0 £0 £0 £0 £0 £0 £0
2nd Hand & Empty Home Buy Backs ! ! NAC 60 Buy Back 01 Apr 24 31 Mar 29 2024/25 5 8 9 9 9 20 5 8 9 9 9 20 £2,400,000 60 £0 £0 £333,000 £320,000 £360,000 £360,000 £360,000 £667,000
Laburnum Avenue (Regen 1a)  Beith X: 234170 Y: 653640 NAC 7 New Build 15 Jan 24 17 Jan 25 2023/24 7 7 £699,468 4 3 £0 £620,701 £78,767 £0 £0 £0 £0 £0
Newhouse Drive (Regen 1b)  Kilbirnie X: 230940 Y: 653815 NAC 7 New Build 15 Jan 24 17 Jan 25 2023/24 7 7 £699,468 4 3 £0 £620,701 £78,767 £0 £0 £0 £0 £0
Former St Mary's school Largs X: 220995 Y: 659630 NAC 26 New Build 15 Jan 24 31 Jan 25 2023/24 26 26 £3,976,743 14 12 £0 £2,457,542 £1,519,201 £0 £0 £0 £0 £0
James McFarlane (Redev 8a) Ardrossan X: 223300 Y: 643345 NAC 19 New Build 25 Mar 24 18 Jul 25 2023/24 19 19 £1,993,029 10 4 1 4 £291,370 £510,102 £1,191,558 £0 £0 £0 £0 £0
Stanecastle (Redev 11a) Irvine X: 234070 Y: 640150 NAC 31 New Build 25 Mar 24 18 Sep 25 2023/24 31 31 £3,204,355 17 7 3 4 £575,543 £506,031 £2,122,781 £0 £0 £0 £0 £0
King's Arms (Regen 1c) Irvine X: 232090 Y: 638935 NAC 6 New Build 13 May 24 01 Dec 25 2023/24 6 6 £769,055 6 £288,868 £24,131 £456,056 £0 £0 £0 £0 £0
Garnock Academy (Redev 9) Kilbirnie X: 231290 Y:654800 NAC 50 New Build 17 Jun 24 31 Jan 26 2023/24 50 50 £5,306,966 28 13 2 7 £530,177 £0 £3,308,000 £1,468,789 £0 £0 £0 £0
Ayrshire Central (Redev 12) Irvine X: 232105 Y: 640785 NAC 202 New Build 04 Nov 24 30 Nov 27 2024/25 202 202 £24,355,655 65 85 26 26 £2,252,936 £0 £2,348,508 £7,874,211 £7,128,000 £4,752,000 £0 £0
Nelson Street Largs X: 220655 Y: 659595 NAC 3 Refurb 01 Apr 25 01 Dec 26 2024/25 3 3 £171,000 3 £0 £0 £10,000 £161,000 £0 £0 £0 £0
Montgomerie Park Irvine X: 233060 Y: 641300 NAC 188 New Build 01 Mar 26 30 Apr 29 2025/26 188 188 £24,822,268 121 32 19 16 £4,579,235 £0 £0 £280,000 £740,000 £2,500,000 £4,894,831 £11,828,202
Nursery Place (Regen 1e) Ardrossan X: 223735 Y: 642845 NAC 6 New Build 01 Apr 26 30 Apr 27 2026/27 6 6 £796,362 4 2 £0 £0 £0 £0 £250,000 £546,362 £0 £0
Grange Court (Regen) Stevenston X: 226485 Y: 642150 NAC 6 New Build 01 Apr 26 30 Apr 27 2026/27 6 6 £823,563 6 £0 £0 £0 £0 £250,000 £573,563 £0 £0
Fullarton Street (HF) Irvine X: 232050 Y: 638550 NAC 43 New Build 12 Jul 26 31 Jul 28 2024/25 43 43 £5,902,198 36 4 1 2 £0 £0 £0 £0 £500,000 £812,029 £4,590,169 £0
Bourtreehill Village (Redev 7) Irvine X: 234475 Y: 639220 NAC 32 New Build 01 Aug 28 31 Aug 29 2024/25 32 32 £4,630,312 24 6 1 1 £0 £0 £0 £0 £0 £0 £2,000,000 £2,630,312
Cairn Buy Back Programme ! ! Cairn 2 Buy Back 01 Apr 24 31 Mar 26 2024/25 2 2 £85,000 2 £0 £0 £80,000 £5,000 £0 £0 £0 £0
Garven Road (Confidential Site 8)  Stevenston X: 227180 Y: 641075 CHA 20 New Build 25 Sep 23 01 Oct 24 2023/24 20 20 £3,200,000 18 1 1 £0 £2,691,071 £508,929 £0 £0 £0 £0 £0
CHA Buy Back Programme ! ! CHA 6 Buy Back 01 Nov 23 31 Mar 30 2023/24 1 1 1 1 1 1 1 1 1 1 1 1 £240,000 6 £0 £0 £45,000 £40,000 £40,000 £80,000 £35,000 £0
Unallocated CHA Block (67 units) TBA TBA CHA ‐ New Build ‐ ‐ 2025/26 £0 £0 £0 £0 £0 £0 £0 £0 £0
Riverside Buy Back Programme Kilwinning ! Riverside 15 Buy Back 01 Apr 23 01 Mar 27 2023/24 2 3 5 5 2 3 5 5 £1,367,730 15 £0 £80,000 £92,434 £400,000 £400,000 £395,296 £0 £0
Springbank (Confidential site 4) ₳  Arran X: 202088 Y: 635639 Trust 26 New Build 01 Dec 25 30 Sep 27 2024/25 26 26 £5,000,000 26 £0 £0 £0 £1,231,000 £2,112,000 £1,657,000 £0 £0
Trust Buy Back Programme Arran ! Trust 6 Buy Back 01 Nov 23 31 Mar 29 2023/24 2 1 1 2 2 1 1 2 £600,000 6 £0 £196,250 £0 £100,000 £100,000 £203,750 £0 £0
761 380 230 71 17 42 21 70 121 19 257 53 241 £93,570,771 469 178 0 54 60 0 £8,518,129 £10,234,129 £12,173,000 £11,880,000 £11,880,000 £11,880,000 £11,880,000 £15,125,514
CONFIDENTIAL DRAFT SHIP Shadow Programme 2025‐2030
Pre 2025/26
2025/26
2026/27
2027/28
2028/29
2029/30 +
2024/25
2025/26
2026/27
2027/28
2028/29
2029/30 +
General Needs
Amenity
Supported
W
heelchair
Ground Floor
Living
Sheltered
Corsehillhead Kilwinning X: 231315 Y: 643095 NAC 7 New Build 01 Jul 27 01 Aug 28 2027/28 7 7 £1,908,397 5 2 £202,654 £0 £0 £0 £0 £900,000 £805,743 £0
James Reid & FC (Redev 8b) Saltcoats X: 225511 Y: 642690 NAC 46 New Build 01 Jul 27 01 Jan 29 2027/28 46 46 £7,215,204 26 11 4 5 £829,748 £0 £0 £0 £0 £2,500,000 £3,885,456 £0
St Michael's Phase 3 (NAC unallocated) Kilwinning X: 229300 Y: 643040 NAC 46 New Build 01 Oct 27 01 Apr 29 2027/28 46 46 £7,432,515 26 10 4 6 £0 £0 £0 £0 £0 £1,500,000 £5,000,000 £932,515
Regeneration Project 1d Ardrossan TBA NAC 36 New Build 01 Jan 28 31 Oct 29 2027/28 36 36 £7,246,166 20 5 11 £0 £0 £0 £0 £0 £750,000 £3,733,812 £2,762,354
Redburn Place (Confidential site 1) Irvine TBA Cairn 10 New Build 01 Oct 25 01 Aug 26 2025/26 10 10 £1,800,000 6 2 2 £0 £0 £0 £700,000 £1,100,000 £0 £0 £0
Confidential Site 3 Kilwinning TBA Cairn 4 New Build 01 Apr 27 01 Apr 28 2027/28 4 4 £407,000 4 £0 £0 £0 £0 £0 £207,000 £200,000 £0
Confidential Site 12 (CHA unallocated) Kilwinning TBA CHA 25 New Build 01 Apr 26 30 Apr 27 2026/27 25 25 £4,000,000 20 2 2 1 £0 £0 £0 £0 £4,000,000 £0 £0 £0
Bank Street (111) Irvine X: 232720 Y: 639260 CHA 16 New Build 01 Apr 27 30 Apr 28 2027/28 16 16 £2,560,000 16 £0 £0 £0 £0 £0 £1,750,000 £810,000 £0
Sharphill (Ph 5) Saltcoats X: 225351 Y: 643409 CHA 100 New Build 01 Oct 28 01 Mar 30 2028/29 100 100 £14,800,000 78 17 5 £1,277,000 £0 £0 £0 £0 £0 £5,000,000 £8,523,000
Confidential Site 10 Ardrossan TBA CHA 50 New Build 01 Apr 29 31 Oct 30 2029/30 50 50 £8,000,000 45 3 2 £0 £0 £0 £0 £0 £0 £0 £8,000,000
Parkend Gardens Saltcoats X: 225165 Y: 641130 Link 12 New Build 10 Jan 29 10 Jan 30 2028/29 12 12 £1,909,931 8 3 1 £83,625 £0 £0 £0 £0 £0 £100,000 £1,726,306
Regeneration Project 3 Kilwinning TBA Riverside 30 New Build 01 Apr 28 01 Mar 30 2028/29 30 30 £2,833,680 24 3 1 2 £0 £0 £0 £0 £0 £0 £0 £2,833,680
382 0 10 25 155 142 50 0 0 10 25 73 274 £60,112,893 278 58 0 21 25 0 £2,393,027 £0 £0 £700,000 £5,100,000 £7,607,000 £19,535,011 £24,777,855
#REF! £0 £0
₳ The access point for this development should be agreed with NAC Roads as the existing road network may not cope with the additional units
Confidential Sites
Sites removed from SHIP 2024 ‐ 2029
Estimated
SHIP Spend
Year 5
Estimated
SHIP Spend
Year 6
Site Starts Site Completions
Scottish
Government
Grant
Type Estimated
Site Start
Estimated
Practical
Completion
SHIP 2024 ‐ 2029
Added to SHIP November 2023
Estimated
SHIP Spend
Year 2
Estimated
SHIP Spend
Year 3
Estimated
SHIP Spend
Year 4
House Types
Pre 2023/24
Spend
SHIP Spend
2023/24
Estimated
SHIP
Spend Year
1
SHIP
Approval
Year
Site Coordinates Developer Units
Estimated
SHIP Spend
2028/29
Estimated
SHIP Spend
2029/30
Site Town
Estimated
SHIP Spend
2025/26
Estimated
SHIP Spend
2026/27
Estimated
SHIP Spend
2027/28
Estimated
SHIP
Spend
2024/25
SHIP
Approval
Year
Site Starts Site Completions
Scottish
Government
Grant
House Types
Pre 2023/24
Spend
SHIP Spend
2023/24Site Coordinates Developer Units Type Estimated
Site Start
Estimated
Practical
Completion
Site Town
#Official‐Protect
174

Page 175

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet 
Title:    Consultation response: Developing a universal definition
of “care experience” 
Purpose:  To seek approval for the proposed response to the Scottish
Government consultation on developing a universal definition of
“care experience”. 
Recommendation:  That Cabinet approves the consultation response at Appendix 1
for submission to the Scottish Government. 
1. Executive Summary 
1.1 The Promise was launched in 2020 following the National Independent Care Review as
a 10-year programme to support care experienced children and young people. The
Scottish Government has published a consultation paper to seek views on the need for
a universal definition of ‘care experience’ and what the potential impacts of this could
be. 
1.2 North Ayrshire Council alongside the Health and Social Care Partnership (HSCP) are
committed to ensuring that children and young people with care experience are
supported across Council services and that the inequality of outcomes which they
experience are addressed. In December 2023, the Council adopted a definition of “care
experience” which closely aligns to the national proposals in this consultation. 
2. Background 
2.1 The Promise was launched in 2020 following the National Independent Care Review. It
aims to address the inequality of outcomes experienced by children and young people
who have been – or are currently in – the care system, ensuring they are able to fulfil
their potential, reducing the number of children and young people coming into the care
system and increasing the number of preventative, early intervention and community-
based supports for children, young people and families. 
2.2 The Promise tells us that while it is not a legal term, ‘care experience’ is a term that has
a special and different meaning for many of the people who identify with it. This includes
infants, children and young people, and adults who may choose to identify as ‘care
experienced.’ Reasons for this could include that they feel it describes the situation that
they have grown up in, or that this describes an understanding of their personal identity.
However, not everyone who could identify as ‘care experienced’ will choose to do so for
a number of reasons, including that for some people it may feel like a stigmatising term.
Agenda Item 10
175

Page 176

2.3 As well as providing a sense of identity, there are existing supports and entitlements
available to people with care experience, particularly young people with care
experience. This is relevant in areas such as education, including further and higher
education. However, there is not currently one cross-sector definition which is
commonly understood and used in practice; or that acknowledges the individual
experience of care that different people can have. This means that eligibility for existing
supports is not currently connected by a universal definition. This means that while
eligibility for some existing supports may be linked to legal provisions, such as having
been ‘looked after,’ the wording used to define who is eligible to access support can
vary between different organisations. 
2.4 The Promise also tells us that a universal definition of ‘care experience’ will help to
normalise care as more people can understand and relate to it. The Promise sets out
that there must be a more universal, commonly understood definition as it relates to
rights and entitlements and an understanding that the purpose of those rights and
entitlements is to support people with care experience. 
2.5 The HSCP ensures that young people with care experience are supported across
Council services. Some current examples of this work include: 
• 64 active members of the Promise Champions staff network as of August 2024. At
the most recent meeting in September, the Champions were joined by Clare Morris,
Promise Delivery Partner, as a Guest Speaker introducing the ‘Promise Plan 2024-
30’. During the meeting, attendees had the opportunity to begin thinking about their
own service’s work towards the plan and how they might work collaboratively with
the other Corporate Parents attending.  
• Six drop-in sessions for North Ayrshire Council staff have been held to learn more
about the Corporate Parenting Team and how they can best support the Care
Experienced community. 13 members of staff have accessed this so far. Further
drop-ins are planned for September – December 2024.  
• 109 Corporate Parents have attended a training session delivered by the Corporate
Parenting Team between May – August 2024. Some of the partners delivered to
include Ayrshire College, Police Scotland, the School Counselling Team, Fire &
Rescue, HSCP and Connected Communities.  
• All North Ayrshire Council Staff receive access to a copy of triannual Staff Briefings
and monthly columns on the Staff News website to keep up to date with the
Corporate Parenting Team’s work and how they can get involved.  
• All North Ayrshire Council Staff have been offered the opportunity to attend a face-
to-face or online training session delivered by Each and Every Child focusing on
reducing stigma around the care system and those with care experience.  
• To mark the 10-year anniversary of the Children and Young People (Scotland) 2014
Act, Who Cares? Scotland hosted their first ever Corporate Parenting Awards. They
presented 14 awards to celebrate positive and progressive Corporate Parenting
practice from the last decade while recognising the key role that Corporate Parents
play in the lives of care experienced people.   
176

Page 177

• A Care Experienced young person nominated the Council for the ‘Creating Financial
Equality’ category, which we won. This award was in relation to North Ayrshire
Council being the first local authority in Scotland to introduce a Council Tax
exemption for Care Experienced people, up to the age of 26. This was introduced
as a local initiative in recognition of the barriers that can prevent care experienced
people experiencing financial freedom. After discussions with the Scottish
Government, this was then introduced nationally across Scotland. The judging panel
was comprised of a diverse group of care experienced people and representatives
from Who Cares? Scotland who dedicated their free time to helping shortlist the
nominations.  
• We held a range of events during Care Experienced Week this year (21st – 27th
October 2024). We have worked closely with the internal Media and
Communications Team to provide a series of videos and information across social
media and the NAC website. We also hosted a Family Cinema Night and a
celebration at the Harbour Arts Centre for young people & staff.  
• Two Annual Promise Conferences are planned (one for primary school aged children
and one for secondary/college aged learners). 
• We continue to work closely with care experienced young people. We held a summer
programme this year with four trips offered to care experienced young people and
their families. Our school Champions Boards (Youth Forums) run monthly in
Secondary schools across North Ayrshire and from January 2025 onwards schools
will have the option to introduce this group as part of their timetable. There will also
still be the opportunity for a lunch time group within school as well. 
• Implementation of the Signs of Safety model by the HSCP. This approach is
designed to place parents, children and those naturally connected to the child at the
centre of the assessment, decision-making, and planning process. The goal is to
ensure that children and young people can grow up within their families whenever
possible. The Signs of Safety model emphasises a strengths-based, safety-
organized approach to child protection casework 
2.6 A motion was approved by the Council on 29 March 2023 in support of adding “care
experienced” as a protected characteristic in North Ayrshire’s Equality Impact
Assessments.  In December 2023, the Council agreed to adopt the following definition
of “care experienced” for the purpose of EIAs: 
“Anyone who is currently in care or has been for any length of time regardless of their
age. This care may have been provided in many different settings, such as: 
(i) “Kinship Care” (living with a relative who is not your mum or dad
(ii) “Looked After at Home” (with the help of Social Work)  
(iii) “Residential Care” (Living in a residential home or school) 
(iv) “Foster Care” (living with foster carers)
(v) “Secure Care” (living in a secure accommodation), 
(vi) “Adoption” (living with adoptive parents.” 
The proposed definition within the consultation includes all of these settings as well as
Supported Accommodation. 
177

Page 178

2.7 The consultation response at Appendix 1 sets out proposed support for the need for a
clear and universal definition of care experience. The challenges facing people with care
experience have been the subject of regular discussion through our Promise
Champions Board, with the need for an improved understanding what it means to be
care experienced, types of care experience, and the rights and entitlements that care
experienced people can access. An agreed definition would help avoid confusion,
reduce stigma, and improve consistency of supports and entitlements provided to those
with care experience. 
3. Proposals 
3.1 Cabinet is asked to approve the consultation response from North Ayrshire Council
included at Appendix 1 and for this to be submitted to the Scottish Government by 8
January 2025. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. There may be future legal implications from a sector wide agreed definition of
care experience. 
Equality/Socio-economic 
4.4 North Ayrshire Council and the HSCP are already committed to “The Promise” and to
supporting those with care experience as outlined in the proposed response. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The proposals will deliver on the Council’s key priorities of Wellbeing: To transition to a
wellbeing economy, delivering prosperity, wellbeing and resilience for local people and
Communities and Local Democracy: We will have active, inclusive and resilient
communities by helping to define work which ensures young people with care
experience are supported to achieve their potential and to be an active part of their
community. 
178

Page 179

This also aligns with the key priorities of the HSCP around providing Early and Effective
Support, Tackling Inequalities and Enabling Communities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 This is a national Scottish Government consultation launched on 9 October 2024 and is
due to close on 8 January 2025. The consultation is open to all citizens and
organisations. 
David W. Hammond
Executive Director, Communities and Housing 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324415 or Elizabeth Stewart, Head of Service (Children,
Families and Justice Services) on 01294 317727 
Background Papers
Appendix 1 – Proposed Consultation Response  
179

Page 180

Appendix 1 – Proposed Response 
1. Do you agree or disagree that there is a need for a universal definition to describe
‘care experience’? 
Agree strongly. 
2.  What are your views on the potential advantages of developing a universal
definition of ‘care experience’? 
A universal definition would mean that everyone could have a better understanding of the
persons included in the term “care experienced”, which would in turn result in a better
understanding of the rights and entitlements those persons could access. This could
improve consistency in the entitlements that care experienced people access as this
currently looks very different between local authorities. 
It could support the reduction of stigma around the term ‘care experience’ by making it
universally known and understood. This could enhance a sense of community between
care experienced people and broaden the opportunity to connect. Care experienced
people who are currently unaware that they are care experienced could find it easier to
self-identify with the term and access rights and entitlements if it is better understood. 
It could sharpen the understanding of non-care experienced people to the types of care
experience and the work of The Promise. It could increase care experienced people’s
faith in their Corporate Parents taking them & their experiences seriously. Additionally,
having many different terms e.g. ‘Looked After,’ ‘Care Leaver,’ ‘Continuing Care,’
‘Throughcare,’ ‘Aftercare,’ ‘Care Experienced’ etc, can be confusing for all. 
3. What are your views on the potential disadvantages of developing a universal
definition of ‘care experience’? 
We believe that the potential advantages outweigh the potential disadvantages. 
A universal definition might not capture the unique and diverse experience of all
individuals who are care experienced.   This could lead to a one size fits all approach that
overlooks specific needs and circumstances, that said, it is also recognised that the
definition may become too lengthy as it will need to include the many types of care that
people experience. A definition would need to be as succinct as possible but should not
erase any important information. 
A broader definition could increase the number of individuals eligible for certain supports
and services, potentially stretching resources even further and impacting the quality of
support provided. 
Definitions can become outdated, and this would need to be considered when thinking
about its applicability long-term. Each person’s experience will be unique. Rights and
entitlements will vary greatly for different age groups. Therefore, it might prove difficult to
create a concise definition that encapsulates the vast range of experiences, ages, types,
and needs. 
180

Page 181

People’s opinions may vary greatly when discussing such a sensitive matter, therefore,
there is the risk that some may feel unhappy with the result. This looks to already be
considered by offering the opportunity to engage in a wide consultation. 
There is the possibility that if we continue to label children and young people, it could well
be that the term “care experienced” becomes a stigmatising label itself and is something
that we should remain mindful of. 
In addition, for some children, especially those on compulsory supervision orders at
home, they may not have knowledge or recollection of this legal order and by attaching
the term care experienced, it may trigger or take an individual back to a challenging time
in their life and it could be detrimental to both the individual and their relationship with
their family. 
Whilst we remain supportive of any commitment to positive action to improve the lives of
care experienced children and to create communities where all children grow up loved,
safe and respected, careful consideration must be given to delineate between positive
action and positive discrimination to ensure full compliance with the Equality Act 2010. 
4. Do you have any views on the definition of ‘Care Leaver’ as set out in the
consultation paper? 
As mentioned in the consultation paper, care needs to be taken when creating a universal
definition to consider how this interacts with existing legislation that makes it clear who
has legal rights and duties to support care experienced people. These people should
continue to be held accountable. A definition should ensure that the entitlements that can
be legally accessed as a care experienced person remain clear to both practitioners and
care experienced people. 
5. Do you have any views on the statutory definition of ‘Looked After’ as set out in
the consultation paper? 
While this definition may make it clear for some practitioners supporting care experienced
people to allocate resources, the definition does not describe care in a way that is easy
to understand for all. Nor does it refer to the guidance that a person is termed care
experienced even once they are no longer ‘Looked After’ by the local authority and after
experiencing care at any age, stage or duration of their life. 
6. What experience of care would you expect to be covered by any definition of 'care
experience'? Please choose all that apply. 
A motion was approved by North Ayrshire Council on 29 March 2023 in support of
adding “care experienced” as a protected characteristic in North Ayrshire’s Equality
Impact Assessments. In December 2023, the North Ayrshire Council agreed to adopt
the following definition of “care experienced” for the purpose of EIAs: 
“Anyone who is currently in care or has been for any length of time regardless of their
age. This care may have been provided in many different settings, such as: 
(i) “Kinship Care” (living with a relative who is not your mum or dad
(ii) “Looked After at Home” (with the help of Social Work)  
(iii) “Residential Care” (Living in a residential home or school) 
181

Page 182

(iv) “Foster Care” (living with foster carers)
(v) “Secure Care” (living in a secure accommodation), 
(vi) “Adoption” (living with adoptive parents.” 
The proposed definition within the consultation includes all of these settings as well as
Supported Accommodation. 
There are risks with including Supported Accommodation in the definition as this is not a
clearly defined setting with different understanding of what Supported Accommodation is
and its use from a housing perspective across a number of client groups and social care
settings. 
Any agreed definition including defining specific care settings would need to take
cognisance the legislative framework including the requirement for a decision by the
Children’s Hearing System or a Court. 
7. Do you have any other comments about a proposed universal definition of ‘care
experience’? 
We regularly consult with young people during our Champions Board meetings. They
have expressed that they would like both Corporate Parents and peers to have an
improved understanding of what it means to be care experienced, the types of care
experience, and the rights and entitlements that can be accessed. They believe that
others often confuse them with Young Carers or people with disabilities who require
personal care. They think that an improved, shared understanding for all could reduce the
stigma and discrimination they can face. 
As practitioners, it would help to have a universal definition when we discuss care
experience across services and collaborate as a Promise Champions staff network. This
could potentially help all staff with Corporate Parenting responsibilities to understand and
refine their duties to our care experienced people. 
Even with all the above said, it is also important to note that agreeing a universal definition
does not ensure that individuals will automatically have access to entitlements.  
Anecdotal information tells us that there are some individuals who don’t consider
themselves to be care experienced despite their circumstances growing up.  From a
service perspective, many are reliant on individuals sharing that they are care
experienced to allow them to access additional supports.  Within Health Visiting services
for example, parents are required to tell their allocated Health Visitor of their care
experience, so they can access their entitlement to funded early learning and childcare
for their children aged younger than 3 years old. 
With multiple systems in place across services, the sharing of information which would
remove barriers to access supports is a very long way off and therefore places more of a
reliance on professionals to ask the question, and for the individual to 1) know they are
care experienced and 2) feel able to share that without fear of discrimination/ judgement. 
8. Do you have any comments on the existing language of care? 
The language of care towards care experienced people still needs to improve. There have
been several encouraging steps made so far, and many practitioners are keen to review
& improve their use of written and spoken language. Each & Every Child offer free,
182

Page 183

attentive support. As a Council, we have pledged to using our Care Experienced
Language Charter and Anti-Discrimination & Stigma Policy written by our care
experienced young people who attend our Champions Board. We have a variety of
additional supports on offer for those who require assistance. Language of care continues
to be a priority for us and will develop in 2025, and beyond. 
That said, for some services and functions, there will remain a need to understand current
legal status for children as opposed to their overarching lifelong experience.  For example,
looked after children are entitled to a health assessment.  This assessment is only an
entitlement for the duration of the child or young person’s legal order and not for children
and young people who have previously been looked after, and therefore are considered
to be care experienced.   
9. Do you have any suggestions on potential ways to change and improve the
language of care? 
There needs to be more steps taken for the public, and non-care experienced young
people, to better understand the ‘Care System’ and hear structured real-life stories of
experience and progress. It could be beneficial for practitioners to hear about what other
local authorities are doing that has worked well. 
10. Are you aware of good practice to change and improve the language of care? 
We are aware of some good practice happening in local authorities across the country to
change and improve the language of care. We have worked closely with Each & Every
Child over the past couple of years to provide opportunities for both staff and Care
Experienced people. 
The HSCP have implemented the Signs of Safety model of practice.  This is a strength
and relationship-based framework that aims to work in partnership with children and their
families. The model focuses heavily on how we communicate and work with children and
their families. A shift in language is central to the changes in practice. Professionals from
different disciplines use the same language, which helps in creating a unified approach
to addressing concerns and working towards shared goals.   All written and verbal
communications with families are in clear, everyday language. This helps families
understand the concerns and the steps being taken to ensure safety.  There is a greater
focus on positives, strengths and framing in a bid for the process of intervention to be
viewed as supportive rather than punitive. The model has been well received by both
families and the workforce with families noted to feel more empowered. 
More widely, the redesign of the Children's Hearings System in Scotland places a strong
emphasis on the use of language to ensure it is supportive, non-judgmental, and easily
understood by children and families. 
As mentioned, this area continues to be a priority for us as a Council and we would
welcome the opportunity to hear about other areas of good practice, as well as sharing
our own experience.   
As referred to in question 8, the North Ayrshire Corporate Parenting Team developed a
Language Charter in 2023.  Copy is attached for reference. 
183

Page 184

NA CE Language
Charter.pdf 
11. Further information about your organisation's response: 
As mentioned, this topic has and continues to be regularly discussed with our care
experienced community during Champions Board meetings and other youth work events,
and with North Ayrshire-wide Corporate Parents during our Promise Champions staff
network meetings and training events. 
12. How satisfied were you with this consultation? 
Very satisfied. 
13. Please enter comments here: 
The consultation was clear. The steps were easy to follow, and the questions were
applicable to the subject matter. 
14. How would you rate your satisfaction with using this platform (Citizen Space) to
respond to this consultation? 
Very satisfied. 
15. Please enter comments here: 
The format was accessible. 
184

Page 185

NORTH AYRSHIRE COUNCIL  
03 December 2024 
Cabinet
Title:  Roads Winter Service and Weather Emergencies Plan
2024/25 
Purpose: To seek approval from Cabinet for the Roads Winter Service
and Weather Emergencies Plan 2024/25. 
Recommendation: That Cabinet (a) approves the Roads Winter Service and
Weather Emergencies Plan 2024/25; and (b) notes the
preparations and actions taken which are contained in the
Winter Preparation Action Plan. 
1. Executive Summary 
1.1 North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow and
ice endangering the safe passage of pedestrians and vehicles over public roads which
by definition includes carriageways, footways, footpaths, pedestrian precincts, etc. 
1.2 The Council is also responsible for the management and operation of the coastal flood
protection controls at Largs and Saltcoats. The Council will close the flood gates on the
promenades and erect the flood barriers at Largs Pier in advance of predicted severe
weather with minimum disruption to promenade users and the Largs to Cumbrae ferry.
Coastal flooding can occur at any time and, accordingly, the Council provides this
service throughout the year. 
1.3 A review of the Council's Winter & Weather Emergencies Service was undertaken over
the summer months. The 2024/25 Winter Preparation Action Plan has been developed
to ensure adequate preparations and effective arrangements are in place for 2024/25.
The Winter Preparation Action Plan is included at Appendix 1. 
1.4  The Roads Winter Service and Weather Emergencies Plan 2024/25 is contained at
Appendix 2. 
2. Background 
2.1 In its statutory role as the local Roads Authority, the aim of North Ayrshire Council in
respect of its winter service and weather emergencies is to: 
•  provide a standard of service on public roads which will permit safe movement of
vehicular and pedestrian traffic appropriate to the prevailing weather conditions.
•  establish a pattern of working which will keep delays, diversions, or road closures
to a minimum during adverse weather conditions.
•  conduct operations having regard to the requirements of the Health & Safety at
Work Act 1974 and any other relevant enactments.
Agenda Item 11
185

Page 186

2.2  Separately, the Trunk Road Network is the responsibility of Transport Scotland and
their management contractor, Amey. The Trunk Road network includes the A78, the
A737 from Kilwinning to the Renfrewshire Boundary and A738 from the Pennyburn
Roundabout to the A737 Dalry Road, Kilwinning. 
2.3  All winter gritting and snow clearing operations on the Trunk Road Network are the
responsibility of Amey. The Council’s Roads Team do however liaise on a regular basis
with the trunk road operator during periods of adverse weather in order to provide the
best possible seamless service to the travelling public. 
2.4  The Council’s current updated Winter Preparation Action Plan 2024/25 highlights a
number of key areas where preparation arrangements are being reviewed and
refreshed: 
•  Salt supply resilience, storage and capacity
• Resilience arrangements
•  Grit bins/community resilience 
2.5 Whilst the Council's primary focus is on our Priority Network, our communities have an
expectation of wider assistance during extreme weather, for example in and around
schools, in residential streets, car parking areas etc. There are approximately 500 grit
bins provided on the road network. Salt is also available from a number of supply points
throughout the Council area. Details of planned winter treatments are posted on the
Council’s website. In addition, details of disruption to the road network caused by
adverse weather are also posted on the website. In periods of severe weather Elected
Members are also provided with regular service updates. 
2.6 Road hazard weather forecasting is provided through a collaborative contract led by
South Lanarkshire Council.  Weather Forecast provider, MetDesk Limited, is appointed
as the weather forecast provider. During the winter period MetDesk Limited will provide
the weather forecasting service and monitor road and weather conditions. 
2.7 The Council’s gritting routes have been developed from thermal mapping of the road
network. Thermal mapping is a process by which the variation of minimum night-time
road surface temperature is measured, and this provides the temperature relationship
across the whole network, identifying those sections of the road which are likely to
freeze first. Thermal Mapping identifies colder roads and enables selective targeting of
those areas in need of treatment. Our gritting routes are unchanged for this winter,
details of each Priority route are provided on the Council’s web pages at:
http://www.north-ayrshire.gov.uk/roads-and-travel/winter-gritting.aspx   
2.8  Priority 1 routes will be treated on receipt of an adverse weather forecast as detailed in
the decision-making matrix contained in Appendix C of the Winter Service and Weather
Emergencies Plan 2024/25. 
2.9  Priority 2 routes will be treated in addition to Priority 1 routes when sub-zero
temperatures are forecast to extend beyond midday and will be treated following
completion of Priority 1 routes. Generally, the treatment of Priority 2 routes will
commence at 8.00am however appropriate treatment may be instructed at any time
depending on conditions. 
2.10  Priority 3 routes will generally only be treated following severe weather or when sub-
zero conditions are forecast to continue over an extended period. They will be treated
as resources permit only after all Priority 1 and Priority 2 routes are clear unless
identified as an emergency. 186

Page 187

2.11 Operational resources from Neighbourhood Services (Roads and Streetscene) will be
provided for the Winter and Weather Emergencies Service. The stand-by period for
carriageway treatments will be 10 October 2024 until 10 April 2025. This period may be
extended beyond the given dates if required. These arrangements include home stand-
by which is activated by the designated Winter Supervisor when instructed by the
Winter Controller or as the result of hazardous road conditions being reported.
Arrangements have also been made with Streetscene to assist with the treatment of
priority footways over the winter season and stand-by arrangements are also in place
with Streetscene to treat footways, when necessary, at weekends from 23 November
2024 through to 2 February 2025 and over the festive holiday period. Generally, the
treatment of footways will commence at 8.00am. 
2.12  Last winter season, which was generally a mild winter the Service used 5,848 tonnes of
salt, this was similar to the previous year when we used 5,097 tonnes of salt treating
the road network, however in winter 2020/21, which was a colder winter, the Service
used 8,153 tonnes of salt during the winter. A total of approximately 7,000 tonnes of
salt will be stored at our Goldcraigs Depot and 2,400 tonnes at our Market Road Depot
on Arran, complying with the salt stock levels agreed with the West of Scotland
Regional Resilience Partnership (WoSRRP). In addition, salt will be distributed to
Streetscene Depots to assist with the treatment of footways. Salt usage will be
monitored weekly and stocks will be augmented if necessary. 
2.13  The role of communities to provide their own resilience is recognised and grit bins will
be replenished to allow communities to self-help during periods of adverse weather
within available resources over the winter period. 
2.14  Similar to last winter, winter treatment decisions and any road closures due to adverse
weather will be provided on the Council’s website. 
2.15  A pre-winter planning meeting was held on 3 September 2024 with Managers from
across Council Services. This meeting was held to ensure Services are taking the
necessary steps to prepare for the severities of winter weather. 
2.16  A planning exercise known as the ‘dry run’ was carried out on 4 October 2024 to check
our readiness for the forthcoming winter season. 
2.17  The weather stations on the A760 at Catburn, between Largs and Kilbirnie, and on the
B880 String Road, Arran have been serviced and calibrated and will assist Winter
Controllers and Supervisors in monitoring weather conditions. Cameras are fitted on
the weather stations and images from the these are available to members of the public
through the Council’s website. 
2.18 Each year, a Winter Preparation Action Plan is created to ensure adequate and
appropriate arrangements are being put in place for the forthcoming winter. The
2024/25 Action Plan detailed at Appendix 1 confirms all planned actions are either
complete or are on target. 
2.19 In critical situations should our operational resources be impacted; a reduced priority
network has been developed to ensure that essential transport links can continue to be
treated during adverse weather conditions.  This minimum resilience network will assist
in maintaining network access for vital services in extreme circumstances. 
3. Proposals 
3.1  Cabinet is asked to approve the Roads Winter Service and Weather Emergencies Plan 187

Page 188

2024/25 and note the preparations undertaken as detailed in the attached 2024/25
Winter Preparation Action Plan.  
4. Implications/Socio-economic Duty
Financial
4.1 A budget of £0.658 m has been allocated for the delivery of the Roads Winter Service
and Weather Emergencies Plan 2024/25. 
Human Resources 
4.2 The Winter Service and Weather Emergencies Plan will be delivered within existing
resources. 
Legal 
4.3 The Council has a statutory obligation under Section 34 of the Roads (Scotland) Act
1984 "to take such steps as they consider reasonable to prevent snow and ice
endangering the safe passage of pedestrians and vehicles over public roads". 
Equality/Socio-economic 
4.4 The delivery of the Winter Service maintains accessibility to our towns and
communities and supports social and economic activity. 
Climate Change and Carbon 
4.5 This report provides details of operational arrangements in place for responding to
Climate and related weather emergency incidents. There are no carbon issues arising
directly as a result of this report. 
Key Priorities 
4.6 Delivery of the winter service supports the Council Plan priority of keeping North
Ayrshire residents safe. 
Community Wealth Building 
4.7 Delivery of the Winter and Weather Emergencies Service supports Community
Wealth Building by maintaining a resilient road network enabling access to
employment and movement of goods and services.  
188

Page 189

5. Consultation 
5.1 Consultation regarding preparations for the forthcoming winter season and the
development of the Winter Action Plan was undertaken with The Ayrshire Civil
Contingencies Team, Transport, Streetscene, Waste Services, Communications,
Customer Services, North Ayrshire Health and Social Care Partnership, Education,
Housing, suppliers, and external organisations. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Neighbourhood Services
on 01294 324570. 
Background Papers
Appendix 1 – Winter Preparation Action Plan 2024-25
Appendix 2 – Winter Service 2024-25
189

Page 190

1
Appendix 1 
NEIGHBOURHOOD SERVICES - 2024/25 WINTER PREPARATION ACTION PLAN 
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
1.0 Policies, Procedures
& Guidance    
1.1 Review Existing Policy
and Procedures
document
Winter and Weather Emergencies
Procedures and Resources Document
reviewed on annual basis. 
Review annually after each Winter
Period.
September
2024
Complete      
2.0 Review of Existing
Winter Maintenance
Operations    
2.1 Existing Priority Gritting
Routes
Priority 1 routes cover 44% of the
network, Priority 2 routes cover 21% of
the network.   
No changes proposed, review
annually.
September
2024  Complete
2.2  Non-Priority Routes Priority 3 routes are treated following
an extended cold spell or following
severe weather. 
No changes.  September
2024 
Complete 
2.3 Footway Gritting Formal arrangement with Streetscene
for assisting with reactive delivery of
the winter service. 
Review annually.  September
2024
Complete
2.4  Assistance from outside
parties
Formal arrangement in place with local
contractors to assist in the event of
extreme weather conditions. 
Review annually.  Arrangements
made for a contractor to provide
Gritting on Cumbrae for this
winter. 
September
2024
Complete
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
2.5 Gritting of other Council
locations
Education and Housing have
arrangements in place with
Streetscene and Community Justice
Review arrangements annually.  September
2024 
Complete 
190

Page 191

2
for assistance with snow clearing and
gritting. 
2.6 Network Resilience Resilience network developed should
drivers be depleted in extreme
situations (eg. The Pandemic)  
Mutual aid arrangements established
with neighbouring authorities Trunk
Road Operator. 
Review annually  September
2024
Complete      
3.0 Winter Gritting Fleet    
3.1 Winter Gritting Fleet The gritting fleet comprise 13 No. 18
tonne Econ Uni-Bodies and 1 No 7.5
Tonne Econ Uni-Bodies and 1 Trailer
Gritter. 
1 new 7.5 tonne Multi-spread to
be provided for this winter season.
Vehicles to be serviced and gritter
units to be calibrated.   
October
2024
Complete      
4.0 Operational Controls    
4.1 Weather forecast
provision
The Council’s weather forecast service
is currently procured by means of a
collaborative contract with 12 other
Local Authorities in the South West of
Scotland. 
A contract is in place for this winter
with MetDesk Limited, Contract
was awarded for 4 years + 2 year
extension option, commencing
May 2023. 
September
2024
Complete
4.2 Ice Prediction methods North Ayrshire Council has two
weather stations installed on the road
network and has access to a further
two weather stations in the Council
area, provided by Transport Scotland,
on the trunk road network. We also
have access to a number of additional
weather stations on our neighbouring
authorities’ road network. 
Stations to be serviced and
calibrated for start of winter
season. 
September
2024  Complete
191

Page 192

3 
Service Improvement
Action
Existing Operation Proposed Action Timescale Progress
4.3 Winter Gritting Records Records of winter instructions and
operations recorded on Vaisala
Manager - Winter Roads Management
System. Record footway treatments
undertaken.
Continue to record roads winter
actions on Vaisala Manager -
Winter Roads Management
System. 
September
2024  Complete
4.4 Business Continuity The provision of Winter and Weather
Emergencies Procedures and
Resources document is included within
the Business Continuity Plan. 
Review Business Continuity Plan. Review
Annually  Complete     
5.0 Salt    
5.1 Salt Storage Ensure salt stock complies with
Scottish Government resilience levels
prior to the onset of the winter season. 
7000 Tonnes of salt to be stored
at Goldcraigs Depot and 2400
tonnes to be stored on Arran for
start of winter season. 
Review
Annually  Complete
5.2 Salt Distribution Procedure implemented for salt
distribution throughout Council
Services in place at Depot.
Review and ensure all staff are
aware of procedures annually.
Review
Annually  Complete      
6.0 Communication    
6.1 Information available to
Members, Council
Services, general public
and other stakeholders
Weather forecasts and winter
decisions distributed across Services. 
Roads winter gritting decision posted
on Council Website. 
Details of any road closures due to
adverse weather posted on Website. 
Issue information to Locality
Planning Partnerships. 
Continue to provide information
on the Council website. 
Monitor effectiveness of
information provided on the
Council website. 
Promote Roads Winter Service
during Customer Services Week
and Are You Ready for Winter
campaign. 
Oct/Nov
2024 
Review
Annually 
Review
Annually 
Oct/Nov
2024
On target 
Complete 
On target 
On target 
192

Page 193

4     
7.0 Measuring
Performance    
7.1 Monitor performance of
winter actions
Performance is currently measured
using APSE Performance indicators
which measure efficiency in relation to
documented procedures. 
Review annually. October
2024
On target
7.2 Monitor performance on
individual routes
Gritting routes optimised following
thermal mapping exercise undertaken
during winter season 2018/19.
No changes proposed, review
annually.
September
2024
Complete            
8.0 Training    
8.1 Winter Service Training Staff trained in delivery of winter
service. 
Identify training needs of
personnel involved with the
provision of the winter
maintenance service.  Arrange
appropriate training. 
Review
Annually 
Complete 
8.2 Severe Weather
Exercise
Ayrshire Local Resilience Partnership
arrange Severe Weather tabletop
exercises periodically.
Appropriate attendance at ALRP
exercises as arranged.
As arranged. Complete      
9.0 Health & Safety    
9.1 Toolbox Talks Toolbox talks are delivered to all
personnel engaged in the delivery of
the winter maintenance service.
Review annually and provide
toolbox talk at the start of each
winter.
Annually Complete 
193

Page 194

APPENDIX 2 
Neighbourhood Services
Roads Winter Service
and
Weather Emergencies Plan
2024 to 2025
Cunninghame House
Irvine
Ayrshire KA12 8EE
Phone: 01294 310000
194

Page 195

1 | P a g e
Contents
1. Introduction ............................................................................................................... 3
2. Priorities For Winter Treatment ................................................................................. 4
2.1.1 Carriageway Priorities ........................................................................................ 4
2.1.2 Carriageway Routes for Proactive Treatment .................................................... 4
2.1.3 Carriageway Routes for Reactive Treatment ..................................................... 4
2.1.4 Carriageway Routes for Snow Clearance .......................................................... 5
2.1.5 Cumbrae ............................................................................................................ 5
2.2 Footway/Footpath Priorities ............................................................................... 5
2.3 Cycle Routes ...................................................................................................... 6
2.4 Response and Treatment Times ........................................................................ 6
3. Organisation .............................................................................................................. 6
4.1 General .............................................................................................................. 7
4.2 Labour ................................................................................................................ 7
4.3 Vehicle Plant and Equipment ............................................................................. 7
4.4 Salt ..................................................................................................................... 8
5. Other Resources ....................................................................................................... 8
6. Weather Forecasting ................................................................................................. 8
7. Decision Making ........................................................................................................... 9
.8. Ice Prediction .......................................................................................................... 10
9. Road Condition Reports .......................................................................................... 10
10. Communications .................................................................................................. 10
11. Road Closures ..................................................................................................... 11
12. Liaison With Police Scotland ............................................................................... 11
13. Ayrshire Local Resilience Partnership (ALRP) Disruptive Weather Response
Arrangements ................................................................................................................. 12
14. Cross Boundary Arrangements ........................................................................... 12
195

Page 196

2 | P a g e
15. Vehicle Routes .................................................................................................... 12
16. Precautionary Salting .......................................................................................... 13
17. Grit Bins ............................................................................................................... 14
18. Largs And Saltcoats Flood Protection Schemes .................................................. 14
19. Sandbag Procedures ........................................................................................... 14
20. Resilience Arrangements .................................................................................... 15
Appendix A - Level of Service ......................................................................................... 16
Appendix B - Decision Making ........................................................................................ 17
Winter Treatment Spread Rate Matrix ............................................................................ 18
Appendix C - Summary of Available Labour & Plant ..................................................... 200
Appendix D - Community Grit Bins ................................................................................. 21
Appendix E - Summary of Available Materials .............................................................. 222
Appendix F - Salt Resilience Plan (Mainland) ............................................................... 233
Appendix G - Contact Address & Telephone Numbers ................................................. 255
Appendix H - Distribution List ........................................................................................ 266
Appendix I - Bridges with Weight or Height Restrictions ............................................... 277
Appendix J - Arrangements with other Authorities .......................................................... 29
Appendix K - Grit Bin Policy & Procedure ..................................................................... 300
Winter gritting (north-ayrshire.gov.uk) ........................................................................ 300
Appendix L - Winter Minimal Resilience Network ........................................................... 31 
196

Page 197

3 | P a g e
1. Introduction
North Ayrshire Council has a statutory obligation, under Section 34 of the Roads
(Scotland) Act 1984, to take such steps as it considers reasonable to prevent snow and ice
endangering the safe passage of pedestrians and vehicles over public roads which
includes carriageways, footways, footpaths, pedestrian precincts. 
In its statutory role as the local Roads Authority, the aim of North Ayrshire Council in
respect of its winter service and weather emergencies is to: -
1. provide a standard of service on public roads which will permit safe movement of
vehicular and pedestrian traffic appropriate to the prevailing weather conditions.
2. establish a pattern of working which will keep delays, diversions, or road closures to
a minimum during adverse weather conditions.
3. conduct operations having regard to the requirements of the Health & Safety at
Work Act 1974 and any other relevant enactments.
This Plan only relates to the Council’s duties as Roads Authority and does not cover the
wider response of the Council during winter and other weather emergencies.
North Ayrshire Council has no responsibility for the treatment of trunk roads. From 01 April
2001, the contract for management and maintenance of the trunk roads in Scotland has
been awarded by the Scottish Government to the private sector. The successful contractor
for the South West of Scotland is Amey and the roads involved in North Ayrshire are as
follows: -
A78 full length from Meadowhead roundabout, Dundonald to Inverclyde boundary
at Skelmorlie.
A737 Dalry Road, Kilwinning to Renfrewshire boundary.
A738 Pennyburn roundabout to A737 Dalry Road, Kilwinning
All winter gritting and snow clearing operations on these roads will be the responsibility of
Amey. North Ayrshire Council’s Neighbourhood Services (Roads) and Amey liaise on a
regular basis during periods of adverse weather to provide the best possible service to the
travelling public.
North Ayrshire Council is also responsible for the management and operation of the
coastal flood protection controls at Largs and Saltcoats. The Council will close the flood
gates on the promenade and erect the flood barriers at Largs Pier in advance of predicted
severe weather with minimum disruption to promenade users and the Largs to Cumbrae
ferry. Coastal flooding can occur at any time and, accordingly, the Council will provide this
service throughout the year.
In the event of extreme weather similar to that which was experienced on Arran late March
2013, where major disruption affected large parts of the community, a coordinated
response is adopted by the Council to ensure public safety. In dealing with such
emergencies, Police Scotland initially lead the emergency or response stage of the
emergency. Thereafter, the Council leads the recovery stage. Generally, there are 3 levels
of Civil Contingencies response. There is a strategic group at National
197

Page 198

4 | P a g e
or Strathclyde wide level, a tactical group at North Ayrshire level and an operational group
at local level.
The Ayrshire Civil Contingencies Team (ACCT) act as lead for the Council and implement
the Civil Contingencies Plan liaising with all relevant Stakeholders identified within the
Plan.
2. Priorities For Winter Treatment 
North Ayrshire Council has defined the priorities for carriageway and footway/footpath
treatment as follows:
2.1.1 Carriageway Priorities
Where slush is formed, this shall be removed as soon as practicable to avoid the risk of
rutting should there be a further significant fall in road temperatures which might result in
freezing conditions.
2.1.2 Carriageway Routes for Proactive Treatment
Priority 1 – Strategic, Main Distributor and Distributor routes, bus routes and certain pre-
determined Secondary Distributor routes identified from the Local Transport Strategy
(LTS) will be treated when it is forecast that snow or ice is likely to be present on road
surfaces.
Due to the various climatic domains within North Ayrshire the Priority 1 routes may be
adjusted to cover either the four pre-determined Inland Routes or two pre-determined High
Routes which all currently form part of our existing Priority Network.
Priority 1 gritting routes are available on the Council website here Winter gritting (north-
ayrshire.gov.uk)
2.1.3 Carriageway Routes for Reactive Treatment
Priority 2 – Remaining Secondary Distributor, local access, and residential distributor
roads.
Given the presence of ice and snow, Priority 2 routes may be treated during normal
working hours as resources permit, when sub-zero temperatures are forecast to continue
beyond midday following completion of Priority 1 routes.
Priority 3 – The remaining road network including minor rural unclassified routes and
remaining residential areas not already covered.
Priority 3 routes will be treated as resources permit when sub-zero conditions are forecast
to continue over an extended period only after all Priority 1 and Priority 2 routes are clear
unless it is identified as an emergency.
198

Page 199

5 | P a g e
2.1.4 Carriageway Routes for Snow Clearance
On receipt of a weather warning predicting medium (25 - 100 millimetres deep) or heavy
(over 100 millimetres deep) snowfalls, the Senior Manager (Network) where appropriate,
will recall to depots such vehicles capable of being equipped with snow ploughs.
While snow is still falling the Strategic and Main Distributor Network will be prioritised for
ploughing and treatment in order to target resources and to keep these routes open for
traffic.
After snow has stopped falling but is lying, the remaining Priority 1 precautionary routes
will be ploughed and treated before commencing ploughing and treatment on Priority 2
and Priority 3 routes as resources and conditions permit.
2.1.5 Cumbrae
There are no Roads Operatives based on the Isle of Cumbrae, however contract
arrangements have been made to carry out gritting operations and assist with weather
emergencies on the Island.  
2.2 Footway/Footpath Priorities
With limited resources available footways and footpaths will only be treated when
considered necessary (heavy snowfall or extensive icing). They will normally only be
treated during normal working hours (commencing from 8am), but arrangements are in
place to undertake emergency work out of normal working hours, weekends, and public
holidays in extreme circumstances.
Generally, treatment of footways and footpaths will be reactionary and not pre-planned,
and where possible work will be undertaken during normal working hours. 
When treatment is instructed the following priorities will apply: -
Priority 1 Routes will be considered for treatment if it is forecast that ice or snow is likely
to be present or where surfaces are wet with temperatures forecast to remain below zero
until 10am the next working day.
Priority 1 Routes - Urban shopping areas and precincts, footway access to 
schools, emergency facilities including fire and rescue, 
police and ambulance services, hospitals, sheltered    
housing, doctors surgeries and health centres. 
Priority 2 routes will be treated if it is forecast that ice or snow is likely to be present with
temperatures forecast to remain below zero for a prolonged period only after priority 1 routes
are clear.
Priority 2 Routes -  Steep hills on main distributor and residential distributor routes,  
routes to bus stops, only after all Priority 1 have been    
cleared:
199

Page 200

6 | P a g e
Priority 3 routes will be treated if it is forecast that ice or snow is likely to be present with
temperatures forecast to remain below zero for a prolonged period only after priority 1 and
2 routes are clear.
Priority 3 Routes - Other areas of high pedestrian concentration.
Streetscene staff will assist with the treatment of footways. 
To maximise coverage on footways, generally only one side of a road will be initially
treated.
It is not possible for the Council to treat all footways and footpaths within North Ayrshire.
As such the Council encourages the community to participate in self-help, through the use
of grit bins which can be requested through the grit bin application process. Grit bins will
only be allocated where it has been assessed and deemed as an appropriate location by
the Council.
2.3 Cycle Routes
With limited manpower resources no treatment will be carried out on off road cycle routes.
2.4 Response and Treatment Times
Routine precautionary salting of priority 1 carriageway routes should be completed within 3
hours of the planned start time. For emergency or unplanned salting, the start time from
leaving the depot shall be no more than 1 hour. 
3. Organisation
The Head of Neighbourhood Services is responsible for specifying the level of winter
service required based on approval from the Council. The Senior Manager (Network) is
responsible for implementing this service.
A duty Winter Controller and Winter Supervisor will be appointed by the Senior Manager
(Network) for the whole of the winter period covered by these procedures (mid-October to
early April)
200

Page 201

7 | P a g e
4. North Ayrshire Council Resources (Roads)
4.1 General
Following approval from the Council, it is the responsibility of the Head of Neighbourhood
Services to define the level of service to be provided within their sphere of operations and
to issue appropriate instructions to the Senior Manager (Network) to provide the necessary
labour and plant for winter operations. This level of service will be based on the national
Code of Practice for Well Managed Highway Infrastructure (see Appendix A).
The level of winter treatment is established utilising the weather forecasts provided by
MetDesk Limited in accordance with the winter treatment matrix (Appendix B).
The Senior Manager (Network) shall thereafter be responsible for advising the Head of
Service of any matters which may affect his ability to deal with adverse weather conditions
such as. labour disputes, extensive plant breakdowns.
Labour resources from Neighbourhood Services (Roads) will be provided for the Winter
and Weather Emergencies Service. The stand-by period will be 24 October 2024 until 10
April 2025. This period may be extended beyond the given dates if conditions warrant such
action. These arrangements include home stand-by which is activated by the designated
Winter Supervisor when instructed by the Winter Controller or as the result of hazardous
road conditions being reported.
4.2 Labour
A proportion of the roads labour force will be on stand-by for winter service operations out
of normal working hours, with the remainder on call out as necessary. This allows evening
and early morning precautionary salting to be carried out on our priority carriageway
network to undertake treatment before the morning rush hour.
In determining the labour resources required for the winter service, cognisance is taken of
the key objective to treat all priority routes before the commencement of the morning peak
period.
4.3 Vehicle Plant and Equipment
Prior to commencement of winter service operations, the Senior Manager (Network) will
ensure that all equipment for salting roads and snow clearing is in working order and,
where appropriate, that ancillary items can be fitted to vehicles without difficulty, such as
ploughs set up on blocks to facilitate assembly. The above procedure should also be
applied to vehicles and plant available under contract for the winter service.
The Senior Manager (Network) will ensure that all vehicles engaged in the winter service
are equipped with radios or other appropriate communication devices to allow contact to
be maintained between the depot and operators. Superintendents have mobile
telephones. There is also vehicle tracking system fitted and operational in all vehicles to
reduce the risk associated with gritting operations. 
201

Page 202

8 | P a g e
A summary of labour, vehicles, plant, and equipment available for the winter service work
is detailed in Appendix C.
Once per year the Senior Manager (Network), will organise a trial closure of the flood
gates and erection of the de-mountable barriers at the Largs and Saltcoats flood protection
controls. This is to ensure that the gates and barriers remain in full working order and that
all staff are familiar with the process.
4.4 Salt
Salt is purchased through a Scotland Excel annual purchase contract. Mainland salt
deliveries are stored in the salt barn within the Goldcraigs Depot. Salt on Arran is stored in
the open at the Roads Depot in Market Road, Brodick.
During the season, the Senior Manager (Network) will arrange for a weekly check to be
made on the amount of salt used and for stocks to be augmented as necessary. There is a
procedure in place at the depot to strictly control salt distribution. All vehicles are tagged
and must cross the weighbridge to accurately record salt usage. This includes salt
distributed to Streetscene and contractors assisting with winter service delivery.
Small quantities of salt are available for issue free of charge to the public, subject to
residents supplying a suitable container. Details of locations of community grit bins where
small quantities of salt are available are given in Appendix D
The planned salt stock level at commencement of winter is given in Appendix E.
In the event of prolonged severe weather, the Council has a salt resilience plan (Appendix
F), which will be implemented if conditions require.
5. Other Resources
During adverse weather conditions, the Senior Manager (Network), (after consultation with
the Head of Neighbourhood Services), shall, if necessary, augment his resources by the
use of personnel from Streetscene and external contractors at rates agreed prior to
engagement through a framework contract. The Head of Neighbourhood Services should
be advised, as soon as practicable, of external resources engaged as a result of decisions
made out with normal working hours.
The Senior Manager (Network) will provide a supply of salt to Streetscene and external
contractors where appropriate to permit the treatment of agreed footways/footpaths. This
will be managed through a salt management system based at Goldcraigs Roads Depot.
6. Weather Forecasting
North Ayrshire Council, through a collaborative contract led by South Lanarkshire Council,
has appointed MetDesk Limited, as their weather forecast provider. During the winter
service period MetDesk Limited will provide a weather forecasting service and monitor
road and weather conditions.
202

Page 203

9 | P a g e
The forecasters receive, monitor, and interpret, climatic, ice prediction and weather radar
information on a continuous basis and provide detailed weather forecasts on a daily basis
during the whole winter period.
SEPA operate a coastal flood warning system for the Firth of Clyde. If storm surges and
coastal flooding are predicted, SEPA provide advance warning to the Council by e-mail
and also through their Floodline service which is available on their website or by phone. 
This service is available all year round.
7.      Decision Making
The Senior Manager (Network) will appoint suitably trained and experienced personnel as
Winter Controllers.
During the winter season the Winter Controller will receive the weather forecast around
12.00 hours and decide on the treatment to be carried out. The Winter Controller will check
the treatment decision of neighbouring authorities for consistency and reconsider if
necessary. The weather forecast provider will provide an evening forecast around 18.00
hours and if this update indicates any change in the forecast the Winter Controller will
amend the decision accordingly and advise the Winter Supervisor.
For out of office hours, Saturdays, Sundays and public holidays the Senior Manager
(Network) shall provide the weather forecast provider with contact telephone numbers of
the on-duty Winter Controller. If the forecast conditions change from good to adverse at
any time, then the weather forecast provider will phone the Winter Controller either at work
or at home as appropriate. Thereafter, it is the responsibility of the Winter Controller to
take action including the calling out of stand-by squads to undertake salting/snow clearing.
Winter Controllers have the facility at any time to contact the weather forecast provider for
advice or clarification of forecasts. These arrangements will be in place from 10 October
2024 until 10 April 2025 and these dates can be extended if required.
The decision-making process is illustrated in Appendices A & B.
The Head of Neighbourhood Services will appoint suitably trained staff and experienced
personnel to manage the coastal flood prevention schemes at Largs and Saltcoats. During
the winter season, this will be the Winter Controller.  
203

Page 204

10 | P a g e
8. Ice Prediction
In addition to the weather forecast information, the Council has available further
information from sensors which have been installed at the locations listed below: -
• A78 Ardrossan
• A78 Sharphill
• A737 Highfield
• A760 Catburn
• A735 Near Dunlop
• B880 Arran, summit of The String
The sensors provide current details of road and air temperatures and indicate the
presence of moisture, thereby identifying locations that icing has occurred or where there
is a risk that icing will occur. 
By utilising the data from these sensors, the weather forecast provider is able to
supplement their forecast by producing site specific forecasts. The above information is
available to the Winter Controller via computer link 24 hours a day throughout the winter
period.
9. Road Condition Reports
During periods of adverse weather, the Senior Manager (Network) shall receive reports on
road conditions from the Winter Supervisor by 9.45am. These reports should be updated
as necessary depending on changing circumstances.
10. Communications 
The Head of Neighbourhood Services or nominated senior manager will deal with
statements to the Press, Radio, and Television regarding road conditions throughout the
area. The Council’s Communication team will assist and may take the lead role depending
on the nature of any significant event.
General advice and information, along with timeous service updates, will be placed on the
Council’s website.
The Head of Neighbourhood Services (or nominated senior officer) will ensure that all staff
involved in communication with members of the public are fully briefed with consistent and
accurate information.
A protocol has been agreed by the West of Scotland Regional Resilience Partnership
(WoS RRP) and Ayrshire Civil Contingencies Team (ACCT) for the transfer of information
in relation to Winter and Weather Emergencies.
204

Page 205

11 | P a g e
The Council’s daily winter decisions are available for the public and can be accessed via
the Council’s website. Any winter and weather emergencies can be reported to North
Ayrshire Council and the Trunk Road Operators using the contact information contained
within Appendix G.
The distribution list for winter weather emergencies can be found under Appendix H.
11. Road Closures
Where it is considered that a road is rendered unsafe due to adverse winter conditions
then Police Scotland or persons acting on behalf of the Chief Constable will arrange to
have the road closed and advise the on-duty Winter Supervisor as soon as possible of
their actions. The Winter Supervisor will advise the Winter Controller/Senior Manager
(Network) of any road closures. Appropriate measures will also be taken to re-direct traffic
and to ensure that the necessary signs are put in place. When the road affected is a
through route the adjoining Councils will be kept informed. Police Scotland will advise the
other emergency services (Ambulance & Fire) of the closures.
Prior to signing diversionary routes, the capacity of the roads and the headroom and
weight restrictions of structures should be checked with the Winter Controller to ensure
that they are adequate (see Appendix I).
12. Liaison With Police Scotland
Neighbourhood Services (Roads) will ensure close liaison with Police Scotland, particularly
during periods of severe weather. 
Where practicable, Police Scotland will be informed in advance of North Ayrshire Council’s
proposed operations. Similarly, arrangements have been made for exchanging information
on proposed actions with neighbouring authorities and the trunk road operating company. 
Where necessary the service will request appropriate assistance from Police Scotland
when moving equipment, arranging road closures, and dealing with abandoned vehicles.
Reports from Police Scotland regarding dangerous road conditions should be acted upon
by the Winter Supervisor as soon as practicable, having regard to priorities in this
document and the conditions pertaining throughout the area.  
205

Page 206

12 | P a g e
13. Ayrshire Local Resilience Partnership (ALRP) Disruptive Weather
Response Arrangements
There have been several occasions when severe weather including high winds, heavy rain
and snow has caused disruption to communities and services in Ayrshire. Arrangements
are in place where partner organisations can trigger the ALRP Disruptive Weather
Response Arrangements. The purpose of these arrangements are: - 
• To protect human life, property, and the environment
• To implement a professional and coordinated multi-agency response to the
incident in conjunction with our communities.
• To maintain wider public confidence in the multi-agency response and
minimise general community and infrastructure impact.
• To ensuring that all possible measures are in place to protect vulnerable or
displaced members of the community.
• To support effective public communication regarding the incident along the
principles of warning and informing.
• To ensure awareness of the potential impact of events out with Ayrshire on the
local multi-agency response.
• To ensure that organisational and partnership learning points are captured to
ensure a continuing focus on safeguarding the public.
14. Cross Boundary Arrangements
Because the Council boundaries do not always coincide with convenient turning points at
the end of gritting routes, arrangements have been drawn up with all adjacent authorities
for the gritting routes to be continued short distances to appropriate turning points. See
(Appendix J).
15. Vehicle Routes
A thermal mapping exercise was undertaken on North Ayrshire’s road network over winter
season 2018 to 2019 and routes have been developed by the Roads Service on the basis
of the priorities listed in Section 2. However, in order to minimise unproductive mileage,
some roads in a lower category may be treated out of sequence. This may also occur
when conditions vary throughout the area.
A complete set of route cards will be kept in the Neighbourhood Services (Roads) offices,
with a duplicate set being held in Goldcraigs Depot.
Treatment of precautionary carriageway salting routes should be completed within three
hours of planned start time under routine conditions. When the Winter Controller instructs
immediate winter service operations, the response time to start treatment should be within
one hour.
206

Page 207

13 | P a g e
It should be noted that gritting routes are either at or close to capacity and it is unlikely that
any additions to routes could be considered without additional finance and human
resources. 
16. Precautionary Salting
On receipt, within normal working hours, of a forecast from the weather forecast provider
warning of frost, freezing or snow conditions, the Winter Controller in consultation with the
Senior Manager (Network), shall consider precautionary salting of main roads.
Where such a warning is received out with normal working hours, the Winter Controller
has delegated authority to activate call-out procedures as indicated in Section 7.
Extensive and accurate records of weather forecasts, winter treatment decisions and
actions taken will be kept to demonstrate our compliance to our Winter and Weather
Emergencies Plan.  
207

Page 208

14 | P a g e
17. Grit Bins
There are approximately 550 grit bins distributed across North Ayrshire. These are located
at areas of particular difficulty such as dangerous bends, steep gradients. The policy and
procedures for siting of grit bins, and requests for additional bins is shown in Appendix K.
Grit bins will be refilled prior to the start of winter and as considered necessary during the
winter season and following periods of severe weather when resources are available. 
The locations of Community Grit Bins are listed in Appendix D and are also show on the
council website here Winter gritting (north-ayrshire.gov.uk)
18. Largs And Saltcoats Flood Protection Schemes
On receipt of a severe weather warning predicting a combination of strong winds, high
tides, or tidal surges the Winter Controller will, when necessary, instruct the closure of the
flood gates on the promenade at Largs and/or the erection of the flood barriers at the
Largs Pier and/or Saltcoats promenade.
19. Sandbag Procedures 
The deployment of sandbags to prevent or contain floodwaters can be an effective way of
mitigating the effect of a flood, however the lead time for filling and deployment can be
lengthy, as a large number of bags cannot be filled in advance due to storage problems.
Therefore, an early decision must be taken to sandbag, to avoid a subsequent waste of
time and effort. The deployment of sandbags will be decided with regard to the following
priorities:
1. To prevent loss of life or serious injury
2. Maintenance of access for the emergency services
3. Protection of vital facilities within the community
4. Protection of transportation routes
5. Protection of NAC property
6. Protection of private dwelling houses  
208

Page 209

15 | P a g e
The decision to deploy sandbags will be made by the Winter Controller / Supervisor or
appropriate officers in Building Services, Cleansing or the Island Officer on Arran in
accordance with the Services' callout/emergency procedures.
Notes: 
1. Sandbags will not normally be deployed to protect commercial property;
2. Appropriate stocks of empty and filled sandbags will be held by the Services
mentioned above, based on previous usage and experience.
The above procedure mainly relates to tidal, fluvial and watercourse flooding. Where
flooding occurs as a result of a blocked, damaged, or ineffective Council owned drainage
systems, sandbags will be deployed as required to mitigate the effects of flooding (and
reduce the likelihood of claims against the Council) including the protection of commercial
property. 
Sandbags are not readily available for collection by either residents nor commercial
property owners in the event of heavy rain being forecast, they should make their own
arrangements to ensure that their properties are protected from potential flooding. 
During an emergency situation, the Council will deploy sandbags to protect transportation
routes and properties as far as is possible where flooding occurs in line with priorities
outlined above.  
20. Resilience Arrangements 
In critical situations should our operational resources be reduced, a minimum resilience
network for winter gritting has been prepared. Should we have to reduce our level of
service due to an extreme situation our priority gritting routes will reduce from six to three.
On Arran we may require reducing from two to one gritting vehicle covering the island
routes and the treatment time for gritting operations will increase accordingly.
The Head of Service will decide if the level of service has to be reduced due to extreme
situations. 
Details of our resilience network are attached as Appendix L.  
209

Page 210

16 | P a g e
Appendix A - Level of Service 
Road Surface
Temperature Precipitation
Predicted Road
Conditions Wet / Wet
Patches
Predicted Road
Conditions Dry
Temperature
Forecast
between
+1.5oC and
+0.5oC
No Rain
No Hoar Frost
No Fog
High Route Patrols No action likely
Temperature
Forecast
below +0.5oC
No Rain
No Hoar Frost
No Fog
Priority 1 Routes
Salt before frost
No action likely
Temperature
Forecast
below +0.5oC
Expected Hoar Frost
Expected Fog
Priority 1 Routes
Salt before frost
Priority 1 Routes
Salt before frost
Temperature
Forecast
below +0.5oC
Expected rain
BEFORE freezing
Priority 1 Routes
Salt after rain stops
Priority 1 Routes
Salt after rain
stops
Temperature
Forecast
below +0.5oC
Expected rain
DURING freezing
Priority 1 Routes
Salt before frost, as
required during rain and
after rain stops
Priority 1 Routes
- Salt before frost,
as required
during rain and
after rain stops
Temperature
Forecast
below +0.5oC
Possible rain
Possible hoar frost
Possible fog
Priority 1 Routes
Salt before frost
Monitor weather
conditions
Temperature
Forecast
below +0.5oC
Expected Snow Fall
Priority 1 Routes and
footways
Salt before snow fall
Priority 1 Routes
and footways
Salt before snow
fall
The decision to undertake precautionary treatments should be adjusted, where
appropriate, to take account of residual salt.
All decisions should be evidence based, recorded, and continuously monitored and
reviewed.  
210

Page 211

17 | P a g e
Appendix B - Decision Making
Note:
• Rate of spread for precautionary treatments may be adjusted to take account of
local variations along the routes such as residual salt, temperature variations,
surface moisture (air or road surface) road alignment and traffic density.
• All decisions should be evidence based, recorded and require continuous
monitoring and review.
• Ice refers to all ice on the road surface, including black ice.
• The level of service generally complies with the recommendations laid down in
“NWSRG best practice guide for Winter Salt” as recommended in the Well Managed
Highway Infrastructure Code of Practice and takes account of recommendations by
the SCOTS Winter Group following a review of the Code of Practice and
consultation with the National Winter Service Research Group (NWSRG). 
211

Page 212

18 | P a g e
Winter Treatment Spread Rate Matrix 
Recommended Spread Rates – Dry Salting (g/m2)
Road Surface Temperature
(RST) when frost/ice is
predicted and road
wetness.
Poor Cover
(salt stored
uncovered)
Medium Traffic
Normal Loss
Good Cover
(salt stored
under cover)
Medium
Traffic
Normal Loss
Comments
RST at or above -2 deg
and dry or damp road
conditions
10 10 None
RST at or above -2 deg
and wet road conditions
15 10 None
RST below -2 deg and
above - 5 deg and dry or
damp road conditions
15 or 20 10 or 15 Spread rate dependent
on residual salt on road
surface
RST below -2 deg and
above - 5 deg and wet
road conditions
1 x 20 &
monitor & treat
as required
20 None
RST at or below -5 deg
and above -10 deg and
dry or damp road
conditions
1 x 20 &
monitor & treat
as required
20 Spread rate dependent
on residual salt on road
surface
RST at or below -5 deg
and above -10 deg and
wet road conditions
1 x 20 &
monitor & treat
as required
1 x 20 &
monitor &
treat as
required
None 
212

Page 213

19 | P a g e
Salt Type
Precautionary Treatments
Before Snow or Freezing
rain 
Light or Medium
Traffic Heavy Traffic
Dry Salt Light Snow Forecast 20g/m2 20g/m2
Pre-wet
Salt Light Snow Forecast 20g/m2 20g/m2
Treated
Salt Light Snow Forecast 15g/m2 15g/m2
Dry Salt Moderate/Heavy Snow
Forecast 20g/m2 40g/m2
Pre-wet
Salt
Moderate/Heavy Snow
Forecast 20g/m2 40g/m2
Treated
Salt
Moderate/Heavy Snow
Forecast 15g/m2 30g/m2
Dry Salt Freezing rain Forecast 1 x20g/m2 then monitor 1 x20g/m2 then
monitor
Pre-wet
Salt Freezing rain Forecast 1 x20g/m2 then monitor 1 x20g/m2 then
monitor
Treated
Salt Freezing rain Forecast 1 x15g/m2 then monitor 1 x15g/m2 then
monitor 
213

Page 214

20 | P a g e
Appendix C - Summary of Available Labour & Plant
Type Of Plant/Labour Goldcraigs  Arran  Other
NAC
Total
18 Tonne Uni-body Gritter 10 3 0 13
7.5 Tonne Uni-body
Gritter
1 0 0 1
Trailer Gritter 0 1 0 1
Footway Gritter 1 0 7 8
18 Tonne Uni-body Lorry 10 3 0 13
26 Tonne Multi-lift Lorry 1 0 0 1
7.5 Tonne Uni-body Lorry 1 0 0 1
Tractor 0 0 9 9
JCB 3CX 0 1 0 1
Telehandler 1 1 0 2
Fixed V Plough 3 2 0 5
Small Blade Plough 1 1 0 2
Large Blade Plough 12 3 0 15
Drivers  22 11 0 33
Pickup Drivers 7 4 22 33
Operatives 4 1 29 34 
Note  
When necessary, labour, vehicles, plant and equipment from other Council Departments,
plant hirers and contractors will be used to supplement above resources.
This also applies for non-winter related emergency responses.
214

Page 215

21 | P a g e
Appendix D - Community Grit Bins
Small quantities of salt are available for issue free of charge to members of the public,
subject to their supplying a suitable container from the Community Grit Bins sited at the
following locations.
Ardrossan – Car park, North Crescent Road
Beith – Community centre, Kings Road
Brodick – Household waste recycling centre
Dalry – Car park, Kirk Close
Fairlie – Car park, Pier Road
Irvine – Bartonholm civic amenity site
Kilbirnie – Cleansing depot, Paddockholm Road
Kilwinning – Byrehill Place (off Pennyburn Road)
Lamlash – Council office
Largs – Cleansing depot, Alexander Avenue
Millport – Kepple Pier
Saltcoats – Cleansing depot, Mid Dykes Road
Skelmorlie – Toward View (opposite fire station)
Stevenston – Car park, Garnock Road
West Kilbride – Community Centre, Corse Street  
215

Page 216

22 | P a g e
Appendix E - Summary of Available Materials
The following salt, grit and sand stocks will be in place at commencement of winter: -
Goldcraigs (salt barn)
• 7000 tons of salt 
• 100 tons of sand for sandbags
Arran
• 2400 tons of salt
• 300 tons of sand for sandbags
Cumbrae
• 20 tons of salt
• 500 filled sandbags
Note: Approximately 4000 sandbags are located at Goldcraigs, and 500 on Arran.
216

Page 217

23 | P a g e
Appendix F - Salt Resilience Plan (Mainland)
Level 1 (Green) Service – Stock Levels 2500 Tonnes and above
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 470T – resilience 10 days
or
• Typical daily salt usage (frost & ice only) 235T – resilience 20 days
Level 2 (Amber 1) Service – Stock Levels 1800 Tonnes – 2500Tonnes
• Only Priority 1 carriageway routes treated with pure salt, remaining priority
carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 330T – resilience 2 days.
or 
• Typical daily salt usage (frost & ice only) 165T – resilience 4 days
Level 3 (Amber 2) Service – Stock Levels 1000 Tonnes – 1800 Tonnes
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at
50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix at 50/50
• Typical daily salt usage (snow conditions) 150T – resilience 5 days.
or
• Typical daily salt usage (frost & ice only) 75T – resilience 10 days
Level 4 (Red) Service – Stock Levels less than 1000Tonnes
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at
50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 100T – resilience 10 days
or
• Typical daily salt usage (frost & ice only) 50T – resilience 20 days
Assuming 7000 tonnes in stock at start of winter our total resilience would be either:
• Total Resilience during periods of heavy snow - 27 days
or
Total Resilience during periods of frost & ice conditions - 54 days 
217

Page 218

24 | P a g e
Salt Resilience Plan (Arran) 
Level 1 (Green) Service – Stock Levels 1000 Tonnes and above
• Service levels as detailed in NAC Winter and Weather Emergencies Plan.
• Typical daily salt usage (snow conditions) 52T – resilience 28 days
or
• Typical daily salt usage (frost & ice only) 26T – resilience 56 days
Level 2 (Amber 1) Service – Stock Levels 550 Tonnes – 1000Tonnes
• Only Priority 1 carriageway routes treated with pure salt, remaining priority
carriageway routes reduced to half the normal spread rate or salt/grit mix at 50/50
• All footway routes reduced to salt/sand mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50.
• Typical daily salt usage (snow conditions) 44T – resilience 10 days.
or
• Typical daily salt usage (frost & ice only) 22T – resilience 20 days
Level 3 (Amber 2) Service – Stock Levels 250 Tonnes – 550 Tonnes
• All carriageway routes reduced to half the normal spread rate or salt/grit mix at
50/50
• Priority 1 footway routes treated with salt/sand mix at 50/50
• Remaining footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with salt/sand mix at 50/50
• Typical daily salt usage (snow conditions) 30T – resilience 10 days.
or
• Typical daily salt usage (frost & ice only) 15T – resilience 20 days
Level 4 (Red) Service – Stock Levels less than 250 Tonnes
• Priority 1 carriageways reduced to half the normal spread rate or salt/grit mix at
50/50
• Treat remaining carriageway routes with sand/grit mix at 50/50
• All footway routes treated with sand/grit mix at 50/50
• Grit bins replenished with sand/grit mix.
• Typical daily salt usage (snow conditions) 20T – resilience 12 days
or
• Typical daily salt usage (frost & ice only) 10T – resilience 24 days
Assuming 2,400 tonnes in stock at start of winter our total resilience would be either
• Total Resilience during periods of heavy snow - 60 days
or
Total Resilience during periods of frost & ice conditions - 120 days  
218

Page 219

25 | P a g e
Appendix G - Contact Address & Telephone Numbers
During working hours
North Ayrshire Council
Neighbourhood Services (Roads)
Cunninghame House
Irvine
KA12 8EE
Telephone: 01294 310000
Arran Local Office
Lamlash
Isle of Arran
KA27 8JY
Telephone: 01770 600338
Trunk Roads
A78, A737 and A738
Amey
Network Control Centre
150 Polmadie Road
Glasgow
G5 0HD
Control Room telephone: 0800 0420188
Email: OCCR-southwest@amey.co.uk
Outside of working hours
North Ayrshire Council
Call centre – road and lighting faults
24 hours, seven days a week
Telephone: 01294 310000  
219

Page 220

26 | P a g e
Appendix H - Distribution List 
Copies
North Ayrshire Council
Chief Executive 1
Executive Director: Place 1
Executive Director: Education 1
Executive Director: Communities & Housing 1
Head of Neighbourhood Services 1
Head of Democratic Services 1
ACCT 1
All Elected Members of North Ayrshire Council 33
Police Scotland
Divisional Commander, Kilmarnock 1
Traffic Management, Ayr 1
Strathclyde Partnership for Transport 1
Scottish Fire & Rescue Service – Divisional Commander  1
Scottish Ambulance Service 1
MetDesk Limited 1
Amey 1
Ayrshire Roads Alliance  1
Renfrewshire Council - Head of Roads 1
East Renfrewshire Council – Head of Roads & Planning 1
Inverclyde Council – Head of Transportation & Roads Service 1
Contact Centre, Building Services, Stevenston 1
Contact Centre, Bridgegate House, Irvine 1 
220

Page 221

27 | P a g e
Appendix I - Bridges with Weight or Height Restrictions 
Height Restrictions
Bridge Location Grid Reference Signed
Height
Metric
Signed
Height
Imperial
B714/50: Dalry, Railway Bridge 229960 649702 3.8 12’ – 6”
B706/40: Barrmill 236834 651392 4.0 13’ – 0”
B7047/10: Meadowfoot Road, West
Kilbride
220791 647032 4.6 15’ – 0”
C6/10: West Balgray 235333 642491 3.9 12’ – 9”
C26/10: South Kilruskin 220541 650473 4.4 14’ – 6”
C26/20: North Kilruskin 220423 650868 5.0 16’ – 6”
U67/10: Dubbs 228508 642006 3.0 9’ – 9”
U67(A78 280): Todhill (Dubbs Road,
under A78, Kilwinning Bypass)
229175 642250 4.0 13’ – 0”
U67/30: Nethermains 230059 642199 3.7 12’ – 0”
C56/30: Moor Road 220639 652980 4.7 15’ – 6”
C67/20: Tandelhill 238174 651683 4.4 14’ – 3”
C99/20: Cockenzie 230694 646241 3.0 10’ – 0”
Unc.TG/230: Garnock View,
Glengarnock
231875 653191 3.8 12’ – 6”
Unc.TI/70: Old Church Street, Irvine 213571 638800 4.0 13’ – 3” 
221

Page 222

28 | P a g e
Weight Restrictions
Bridge Location Grid Reference Signed Weight 
B781/30: West Kilbride, Dalry Road 221015 649062 7.5T
C129/20: Floors, north of Kilmaurs 240866 641921 17T
C99/30: Dusk Bridge, near Dalry 230599 646882 7.5T
Unc.TL/30: Largs, May Street 220711 658602 7.5T
U16/10: Dalgarven Mill Bridge, north of
Kilwinning, (formerly Unc.NC/30)
229571 645847 26T
U23: Fairliecrevoch Bridge, Perceton, Irvine 236065 642011 3T
Unc.NT/10: Barrmill 236472 650997 3T (Not Adopted)
U54/30: Sevenacres Mill Bridge, Kilwinning 233123 643810 Currently being
replaced. 
222

Page 223

29 | P a g e
Appendix J - Arrangements with other Authorities
Roads to be treated by North Ayrshire
South Ayrshire – U107 from the South Ayrshire Council boundary at the railway bridge to A759
Auchengate Interchange.
East Ayrshire - A736 – from Caldwell Bridge southwards to Lugton, A736 – from B778
junction south eastwards to Torranyard, C24 - from Greenhill Terrace, Knockentiber to
boundary at Plann Bridge, C126 from Montgreenan Bridge to North Lodge and Knockentiber
Road from boundary near Springside to junction with C24.
Renfrewshire Council - A760 – from boundary to Kerse Road junction and Kerse Road –
from boundary to A760 junction.
Roads to be treated by adjacent authorities
Ayrshire Roads Alliance (East Ayrshire)
A71 – from boundary westwards to Corsehill Roundabout, A735 – that section within North
Ayrshire boundary, B769 – from boundary south westwards to Chapeltoun junction, C129 –
that section within North Ayrshire boundary, C20 – that section within North Ayrshire
boundary, B706 – from boundary to A736, C117 – from Chapeltoun Bridge to Wheatrig
Bridge.
Ayrshire Roads Alliance (South Ayrshire)
B730 from the North Ayrshire Council boundary at the railway bridge south of Drybridge to
junction Shewalton Road, Drybridge.
Note:  There are no cross-boundary arrangements with East Renfrewshire Council.
223

Page 224

30 | P a g e
Appendix K - Grit Bin Policy & Procedure
1. North Ayrshire Council shall provide grit bins for self-help by members of the public.
These shall be sited locally in accordance with this policy.
2. Grit bins shall only be located where the following criteria are met: - 
• The location is not on a precautionary carriageway route.
• The gradient is greater than 1 in 10, or at a junction with a known history of accidents.
• The location shall not obstruct the passage of pedestrians, a minimum of 1.5m
clearance on the footway is required.
• The location shall not obstruct sight lines.
• The location is not within 200m of another grit bin location.
• The location is within an urban area.
• The location is within the boundary of the public road. Neighbourhood Services will
not provide grit bins in private areas or car parks for internal use by either the Council
or any other public or private property such as schools, parks, hospitals, old people’s
homes, etc. unless a service level agreement is in place.
3. Grit bins will only be located where they can be filled from a lorry. The grit bins shall be
refilled prior to the start of winter and as considered necessary during the winter season
and following periods of severe weather when resources are available.
4. Grit bins will generally be left in place during the summer months unless there is a history
of vandalism at a particular location.
5. The location of grit bins will be recorded in an electronic database, which will be made
available on the North Ayrshire Council website.
6. Only written requests on the Council’s Grit Bin Application Form will be considered, these
are available from the Head of Neighbourhood Services, Cunninghame House, Irvine,
KA12 8EE, and on the Council’s website. 
7. A request will not be accepted unless a location to site the grit bin has been agreed.
Therefore, even if the criterion for locating a grit bin is met, a grit bin will not be provided
if the adjacent residents cannot agree a position. The signed agreement of adjacent
residents must be included on the submitted application form, otherwise the application
will not be considered. 
8. Grit Bin Application forms are available on the Council’s website at 
Winter gritting (north-ayrshire.gov.uk)  
224

Page 225

31 | P a g e
Appendix L – Winter Minimal Resilience Network 
225

Page 226

226

Page 227

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet 
Title:    Highlands and Islands Regional Economic Strategy 
Purpose:  To seek Cabinet endorsement for the Highlands and Islands
Regional Economic Strategy 
Recommendation:  That Cabinet: 
a) Notes the input provided by Officers to the development of the
Highlands and Islands Regional Economic Strategy; 
b) Notes the constrained fiscal environment within which the
Strategy will be delivered and that the requirement to ensure
the development of a suitable governance structure and
delivery plan, which takes cognisance of the financing and
resourcing challenges associated with its delivery will be
intimated to HIREP.
c) Endorses the Highlands and Islands Regional Economic
Strategy as provided at Appendix 1. 
1. Executive Summary 
1.1 The Highlands and Islands Regional Economic Partnership (HIREP) was established
in 2021 to enable inclusive and sustainable economic growth and build resilience
throughout the region. It is a partnership of public, private, third sector and academic
organisations who are committed to working together to realise the economic potential
of the region. 
1.2 The Highlands and Islands Regional Economic Strategy (HIRES) has been developed
to define the strategic and collaborative approach to economic development for the
Highlands and Islands region, including the islands of Arran and Cumbrae. The
development of the strategy has been led by Highlands and Islands Enterprise (HIE)
with collaboration and input from across the HIREP membership and consultations
with businesses, third sector, academic and community organisations in 2023 and
2024. 
1.3 North Ayrshire is covered by two Regional Economic Partnerships and therefore two
Regional Economic Strategies. Launched in June 2023, the Ayrshire Regional
Economic Strategy recognises the importance of and challenges faced by our islands.
The Economic Policy Team has actively contributed to the development of the HIRES,
promoting the adoption of Community Wealth Building as a cross-cutting theme to
achieve synergies with the Ayrshire Regional Economic Strategy.
Agenda Item 12
227

Page 228

1.4 The HIRES will be formally approved following consideration and endorsement by
individual HIREP members through their individual governance processes. It is
proposed that Cabinet endorse the HIRES provided as Appendix 1. 
2. Background 
2.1 The Highlands and Islands region is a unique geography made up of seven local
authority areas: Na h-Eileanan Siar, Orkney, Shetland, Highland, Moray, Argyll and
Bute and the North Ayrshire Council islands of Arran and Cumbrae. The region covers
52.3% of Scotland’s land mass and is home to a population of 491,600, equating to
9% of Scotland’s total population. 
2.2 The Highlands and Islands Regional Economic Partnership (HIREP) was established
in 2021 to enable inclusive and sustainable economic growth and build resilience
throughout the region. It is a partnership of public, private, third sector and academic
organisations who are committed to working together to realise the economic potential
of the region. Since inception, HIREP has worked across a range of policy areas
including Housing, Population Attraction and Retention, Skills, Childcare, Local Visitor
Levy, Community Wealth Building and Community Benefit. Membership of the HIREP
includes the following organisations: 
• Na h-Eileanan Siar
• Orkney Council
• Shetland Council
• Highland Council 
• Moray Council 
• Argyll and Bute Council 
• North Ayrshire Council
• Highlands and Islands Enterprise
• Skills Development Scotland
• Scottish Funding Council 
• University of the Highlands and Islands
• NatureScot
• Visit Scotland
• Bord na Gaidhlig
• Highlands and Islands Transport Partnership (HITRANS)
• Cairngorm National Park Authority
• Business representatives and third sector organisations 
2.3  The purpose of the Highlands and Islands Regional Economic Strategy (HIRES) is to
galvanise collaborative partner action in pursuit of shared ambitions, goals and actions
to deliver on the economic potential of the region. It has been informed by the National
Strategy for Economic Transformation (NSET) and aligns with strategies of member
organisations to ensure outcomes are maximised through collaborative action. 
2.4 North Ayrshire is covered by two Regional Economic Partnerships and therefore two
Regional Economic Strategies, the HIRES and the Ayrshire Regional Economic
Strategy (ARES). The ARES recognises the significance of the islands, their key
challenges and actions to address and seeks to support alignment with the 10 year
Island Plans.  Through active engagement in the development of HIRES Officers have
228

Page 229

sought to reduce the potential for duplication and to achieve synergies with the
Ayrshire Regional Economic Strategy 
2.5 The HIRES outlines a 10-year vision for the Highlands and Islands and positions a
Just Transition to Net Zero as a key opportunity for businesses and communities. The
Strategy also recognises the importance of enabling infrastructure, assets and
services across the partnership which will be critical to realising our collective
ambitions. It is acknowledged that the work of individual partners will continue at a
regional or local level, however the Strategy focuses on where collaborative action is
necessary for delivering the best outcomes for the region. 
2.6 The development of the strategy has been led by Highlands and Islands Enterprise
(HIE) with collaboration and input from across the HIREP membership. It has been
subject to two rounds of consultation, round one in November/December 2023 and
round two in Summer 2024. In round one, HIE undertook a targeted consultation with
a cohort of over seventy consultees, including business, third sector, academic and
community interests to seek validation of regional opportunities and challenges
identified by HIREP. Representatives from Arran and Cumbrae were included as part
of the targeted consultation. 
2.7 Round two was an open, online consultation, seeking views on the draft strategy
document during July / August 2024. NAC publicised the opportunity to engage in the
consultation to our island communities through an information email distributed by
Community Planning to both the Arran and North Coast and Cumbraes Locality
Partnership distribution lists, advising the survey was open and encouraging
representatives to review and complete the consultation survey before the closing
date. 
2.8 The strategy sets out the vision of the Highlands and Islands as a “dynamic,
connected, resilient and prosperous region with a balanced and growing population
and a vibrant economy, embedding Community Wealth Building, leading Scotland’s
transition to net zero, and enhancing our natural environment.” In order to shape the
goals and actions of the strategy, HIREP members identified the key economic
opportunities and challenges for the region: 
Key Opportunities:
• Renewable energy and energy transition
• Sustainable tourism and hospitality
• Food & drink and primary sectors including aquaculture
• Life, marine and health industries
• Heritage and creative industries 
Key Challenges:
• Transport services and infrastructure
• Housing availability and affordability
• Domestic and business energy costs
• Population and shortage of labour
• Skills shortages
• Digital connectivity
• Natural habitat and climate change
• Accessible public and private services across the region
229

Page 230

2.9 The strategy sets out clear goals and associated actions requiring regional
collaboration to deliver the vision. The six strategic goals for the region have been
identified as follows: 
1. Increase the profile and understanding of the Highlands and Islands to support
effective policy and unlock regional investment.
2. Become a region which delivers high quality and affordable housing for residents.
3. Enhance the region’s transport and digital infrastructure to become an exemplar of
efficient rural connectivity.
4. Build resilience and competitiveness through place-based opportunities and
stimulating an active culture of entrepreneurship and innovation.
5. Maximise the economic and community benefits from renewable energy
investments and drive the region’s move to net zero and climate
resilience/adaptation.
6. Develop a coordinated response to skills and labour requirements across the
region. 
2.10 Four cross-cutting themes considered fundamental to achieving these collaborative
goals have been identified: 
• Community Wealth Building and Benefit;
• Innovation and Entrepreneurship;
• Population; and
• Just Transition. 
2.11 To deliver the strategy and associated strategic goals, HIREP will put appropriate
governance arrangements in place, including the alignment of some existing regional
specific groups, to provide clear ownership of both development and delivery of
agreed actions. A delivery plan is currently under development and will be refreshed
every two years. 
2.12 The Economic Policy Team has actively contributed to the development of the
strategy, in particular promoting the adoption of CWB as a cross-cutting theme to
achieve synergies with the Ayrshire Regional Economic Strategy. Officers have also
agreed to support HIREP with the development of the governance structure, informed
by the experience of progressing the Ayrshire Regional Economic Strategy and will
continue to sit on the delivery working group. Through this, they will seek to support
the development of a suitable governance structure and delivery plan, which takes
cognisance of the financing and resourcing challenges associated with delivering the
HIRES. 
2.13 The Scottish Government has confirmed that at present, there will be no funding
available to deliver on the commitments set out in the Regional Policy Review to
support Regional Economic Partnerships or Regional Intelligence Hubs. The wider
regional and national funding landscape is unclear at present for example the future of
the Shared Prosperity Fund. This will require to be considered in the development of
governance and resourcing arrangements and more broadly in any future plans for
supporting Regional Economic Partnerships. This is also exacerbated by the nature of
NAC’s regional working where the Council is engaged across two Regional Economic
Partnerships. 
230

Page 231

2.14 Informed by recent experience in relation to the delivery of the Ayrshire Regional
Economic Strategy, Officers are cognisant of the significant scale of the undertaking,
both in terms of a central resource to coordinate activity but also from those tasked
with leading on actions under the strategic goals. Given the constrained fiscal
environment and broad geography of the region, it is noted that delivery and
resourcing of the strategy will be challenging. The wider regional and national funding
landscape is unclear at present for example the future of the Shared Prosperity Fund.
This has been raised with HIREP and will require to be considered in the development
of governance and resourcing arrangements and more broadly in any future plans for
supporting Regional Economic Partnerships. 
2.15 The HIRES will be formally approved by HIREP following consideration and
endorsement by individual HIREP members through their own governance processes.
It is anticipated this process will be completed by the end of the year. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the input provided by Officers to the development of the Highlands and
Islands Regional Economic Strategy.
b) Notes the constrained fiscal environment within which the Strategy will be delivered
and that the requirement to ensure the development of a suitable governance
structure and delivery plan, which takes cognisance of the financing and resourcing
challenges associated with its delivery will be intimated to HIREP.
c) Endorses the Highlands and Islands Regional Economic Strategy as provided at
Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications directly from this report however it is acknowledged
the strategy will be challenging to deliver across a large geography in a constrained
fiscal environment.  Concerns regarding the resourcing and delivery of the HIRES
have been raised with HIREP, and will be further advised when confirming North
Ayrshire’s endorsement of the Strategy, if agreed. The Scottish Government has
confirmed that at present, there is no funding available to deliver on the commitments
set out in the Regional Policy Review to support Regional Economic Partnerships and
Regional Intelligence Hubs. The wider regional and national funding landscape is
unclear at present for example the future of the Shared Prosperity Fund. This will
require to be considered in the development of governance and resourcing
arrangements and more broadly in any future plans for supporting Regional Economic
Partnerships. 
Human Resources 
4.2 Officers have noted concerns with HIREP regarding a lack of resources to deliver the
HIRES, including central coordination of the strategy and organisations tasked with
delivering actions. Officers have agreed to support with the development of a suitable
governance structure and delivery plan which will aim to take cognisance of the
resourcing challenges.
231

Page 232

Legal 
4.3 There are no legal implications. 
Equality/Socio-economic 
4.4 The HIREP recognises that the region has a strong and proud history of extensive
community-led development and action. It notes that Community Wealth Building
(CWB) is pivotal to a successful place-based approach to socio-economic
development and actions will be woven into HIREP’s response to regional
opportunities and will contribute to addressing, in part, key enablers. It recognises that
community-led development is a powerful mechanism for population retention. 
Climate Change and Carbon 
4.5 The HIRES identifies climate change as a key driver for change and aligns with the
Sustainable North Ayrshire Strategy. It offers opportunities for engaging in activity
around energy transition and renewable energy generation. It identifies a goal to
maximise the economic and community benefits from renewable energy investments
and drive the region’s move to net zero and climate resilience/adaptation 
Key Priorities 
4.6 The HIRES aligns with and contributes to the Council Plan priorities of Wellbeing and
Climate Change, in addition to promoting resilient communities on our islands. 
Community Wealth Building 
4.7 The Economic Policy team has actively contributed to the development of the HIRES
to ensure that it was developed in line with Community Wealth Building aspirations. In
particular, they have promoted the adoption of Community Wealth Building as a cross-
cutting theme to ensure synergies with the Ayrshire Regional Economic Strategy and
ensure adoption of CWB principles in delivery. 
5. Consultation 
5.1 The development of the HIRES was informed by consultation across the HIREP
membership as outlined at Sections 2.5 and 2.6. In preparing this Cabinet paper,
consultation has been undertaken with the Cabinet Member for Communities, Housing
and the Islands.  As outlined earlier in this report, engagement has taken place with
communities on our islands in terms of developing the HIRES. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Emma McMullen, Senior Manager- Economic
Policy, on 07956 461806. 
Background Papers
Click here to enter text.
232

Page 233

HIGHLANDS AND ISLANDS REGIONAL ECONOMIC PARTNERSHIP
REGIONAL ECONOMIC
STRATEGY 2025 - 2035
DRAFT October 2024
DRAFT
233

Page 234

1 Introduction ...................................................................................................................................4
An Overview of the Highlands and Islands Region .......................................................................7
The role of Highlands and Islands Regional Economic Partnership ............................................13
Overview of the Regional Economic Strategy 
and its development process ...............................................................................................13
2 Our vision for the region in 2034 ............................................................14
Vision statement ..............................................................................................................................14
Fulfilling our Vision – A Snapshot of the Region in 2034 ............................................................15
3 The rationale for change ............................................................................16
Key Drivers of Change ...................................................................................................................17
Analysis of the Regions Strengths, Weaknesses, Opportunities 
and Threats ...........................................................................................................................19
Opportunities ..................................................................................................................................20
Enablers and Challenges ...............................................................................................................23
Conclusion .......................................................................................................................................27
Contents
Page 2
DRAFT
234

Page 235

4 Goals and actions ........................................................................................26
Cross cutting themes........................................................................................................................29
Our Strategic Goals and Actions ...................................................................................................32
Goal 1:  Increase the profile and understanding of the Highlands 
and Islands to support effective policy and unlock regional investment  ...................................32
Goal 2: Become a region which delivers high quality and affordable 
housing for residents .......................................................................................................................33
Goal 3: Enhance the region’s transport and digital infrastructure to 
become an exemplar of efficient rural connectivity .................................................................... 34
Goal 4: Build resilience and competitiveness through place-based
opportunities and stimulating an active culture 
of entrepreneurship and innovation  ..............................................................................................35
Goal 5: Maximise the economic and community benefits from renewable 
energy investments and drive the region’s move to net zero and 
climate resilience / adaptation ..................................................................................................... 36
Goal 6: Develop a coordinated response to skills and labour 
requirements across the region .......................................................................................................37
5 Delivering our Strategy ............................................................................ 40
Developing an action plan for delivery ........................................................................................40
Monitoring performance ................................................................................................................40
Page 3
DRAFT
235

Page 236

1. Introduction  
Page 4
DRAFT
236

Page 237

The Highlands and Islands is on the cusp of unprecedented
opportunity. Scottish and UK Governments acknowledge
that the region is pivotal in terms of meeting climate change
targets and supporting the shift to clean, green sources of
energy. This will require transformational change, and action
to ensure that economic and social benefits are captured for
people, communities and businesses in all parts of the region.
The Highlands and Islands Regional Economic Strategy sets out where regional scale collaborative actions by HIREP
partners will be crucial for realising the once-in-a-generation opportunities present across the Highlands and Islands
and addressing the development challenges facing the region.
The strategy recognises that HIREP partners will continue to work to their own plans and strategies, delivering at regional
or sub regional level. This document recognises the value of that work and enhances and builds on partners’ actions and
responsibilities. It is not an aggregation of the vital actions delivering local economic development across the region. 
In articulating the need for collaborative regional action, the strategy focuses on areas where working together is the
most effective and efficient means to generate maximum impact and benefit.
Page 5
DRAFT
237

Page 238

Argyll and Bute
Population: 86,000
12.4 people per sq km
Arran and Cumbrae
Population: 5,900
13.3 people per sq km
Highland
Population: 235,400
9.2 people per sq km
Moray
Population: 93,300
41.7 people per sq km
Na h-Eileanan Siar
Population: 26,100
8.5 people per sq km
Orkney
Population: 22,000
22.2 people per sq km
Shetland
Population: 23,000
15.7 people per sq km
An Overview of the Highlands
and Islands Region*
* As far as possible, analysis in this section is based on the HIREP geography. Where data is not available at this level,
the regional figure is based on local authority data (so excludes Arran and Cumbrae), or the Highlands and Islands
International Territorial Level (ITL) geographic classification (excludes Helensburgh and Lomond).
The Highlands and Islands is unique within Scotland and the UK, being a large,
sparsely populated region, similar in size to Denmark, with dispersed settlements and
all of Scotland’s inhabited offshore islands. Over a fifth of residents live on islands and
almost two-fifths in remote rural areas. The region’s complex mountain and coastal
geography provides challenges for connectivity and access to services, markets and
employment. An extensive transport infrastructure including over a quarter of Scotland’s
road network, 60 ferry routes, 10 regional and 10 local authority airports attempts to
mitigate these challenges of rurality and peripherality. Conversely, our extensive land
and marine assets have, over decades, been powerful drivers of our primary sectors,
food and drink and tourism successes and are now shaping the region’s leading role in
renewable energy generation and climate change adaptation and mitigation.
40,793 sq km
52% of 
Scotland’s 
land mass
Page 6
238

Page 239

0.0%
0.2%
0.4%
0.6%
0.8%
1.0%
1.2%
1.4%
1.6%
1.8%
Under 1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98
100+
Scotland HIREP
Scotland
0.0%
0.2%
0.4%
0.6%
0.8%
1.0%
1.2%
1.4%
1.6%
1.8%
Under 1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98
100+
Scotland HIREP
HIREP
-0.04%
-2.5%
1.4%
0.00%
-5.6%
2.9%
-0.8%
-1.5%
-5.2%
-8.0%
-3.7%
-4.5%
-10.6%
-3.9%
-7.5%
-5.5%
Population share by age 2022,
HIREP and Scotland
Percentage change in population,
2011 to 2022
POPULATION
Within the context of national growth, the region’s population remained relatively
stable between 2011 and 2022. However, this masks considerable sub-regional
variation. As with Scotland overall, there is an ageing population with low birth
rates and levels of in-migration, although this can be more acute in our region.
The working age population is lower than nationally in all areas (ranging from
54% in Arran and Cumbrae to 60% in Highland, Moray and Shetland, compared
with 64% nationally) and declining, even where there is overall growth, resulting
in higher dependency ratios. With fewer people than jobs, this highlights the
importance of population attraction and retention for the Highlands and Islands. 
491,600
people
9% of
Scotland’s
population
Scotland 2.7%
Scotland -0.9%
HIREP Argyll
and Bute
Highland Moray Na h-Eileanan
Siar
Orkney Shetland Arran and
Cumbrae
Total population Working age population (aged 16-64) Scotland – total population change Scotland – working age population change
Page 7
239

Page 240

81%
Mobile connectivity
Spring 2024: Proportion of landmass predicted to have good outdoor coverage
from at least one mobile network:
People living in rural
parts of Scotland spend
£50 more per week on
transport than those
living in urban areas
Median (gross) annual
pay of £27,079 in 2023
91% of the Scottish level
Around half of residents
live in the 20% most
deprived areas of
Scotland in terms of
access to services
19% of children aged
under 16 are living in
relative low-income
families 
21% nationally
Over 10,300 second
homes and 12,600 vacant
properties 
(43% and 14% of the
Scottish totals)
5.2% of land is in
community ownership 
99% of the Scottish total
Rises to 50.3% of land in
Na h-Eileanan Siar
Superfast broadband
(>=30mbps)
4G
Full Fibre to
premises
5G
87%
35%
11%
Highlands and Islands
Highlands and Islands
96%
85%
60%
23%
Scotland
Scotland
Broadband connectivity
May 2024: Proportion of premises with access to:
All sectors new build house completions index
(base year = 2008)
COMMUNITIES AND INFRASTRUCTURE
Community, culture and a sense of belonging are powerful assets in the Highlands and Islands.
They are evident in extensive community asset ownership and management, strong levels of
affinity and pride, and high levels of social capital. However, those living in the region face
poorer access to services, higher costs of living, and greater exposure to fuel poverty, along with
lower levels of pay than nationally. Transport poverty is evident, and levels of housebuilding
lag Scotland, with this most acute in remote rural and islands areas. Realisation of the region’s
opportunities is predicated on investment in enabling infrastructure including digital and mobile
connectivity, transport, housing, and service provision, to remove barriers to development. 
110
100
90
80
70
60
50
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Highlands and Islands Scotland
Page 8
240

Page 241

Key labour market indicators
(of those aged 16-64)
% economically inactive
22.5
3.6
10.2
Unemployment rate
% in employment
who are self
employed
Scotland
23.4
2.3
14.1
HIREP
Share of employment by industry 2022*
*Within services, the most dominant sectors are: education, human health and
social work (21.5% of regional employment), wholesale and retail (12.9%)
and accommodation and food services (10.9%)
Services 81.9%
5.6%Construction
Manufacturing
Scotland
73.0%
HIREP
6.3%
6.6%
5.8%
6.3%
14.5%
48% of those aged 16-
64 have a qualification
equivalent to SCQF level
7 or above 
55% nationally
39% of school leavers
went directly into
employment or training
28% nationally
4,273 modern apprentices
in training at the end of
March 2024
11% of the Scottish total
Replacement demand
(2026-2033) of
53,200 jobs
(openings created by
people leaving the labour
market)
42,000+ unique job
postings
(August 2023 to July
2024)
8% of all job postings in
Scotland
Total employment
of 256,000 
9.8% of the Scottish total
SKILLS
GROW
ING
OPPORTUNITY
Primary industries
LABOUR MARKET AND SKILLS
The region has a tight labour market with consistently high levels of
participation and low unemployment. The employment rate and economic
inactivity levels are similar to nationally, though levels of self-employment
are higher. Almost all school leavers enter positive destinations, with a
higher proportion than nationally going directly into employment or training.
Though public sector and services still dominate, employment in construction
and primary industries is higher than nationally, and the employment base
is diversifying. Labour and skills shortages persist, but opportunities are
increasing to reskill/upskill to meet the needs of new and expanding sectors.  
Page 9
241

Page 242

3-year survival rate for
businesses of 64% 
(for those born in 2019) 
57% nationally
1,273 social enterprises
21% of the Scottish total
Business start-up rate of
8.3% in 2022
10.8% nationally
GVA of  £13.3 billion 
8% of the Scottish total
33% of businesses are
innovation active
(2020-2022)
(32% nationally) 
23,095 registered private
sector businesses
13% of the Scottish total
Share of regional GVA
(top three contributors)
Education, human health
and social work
Manufacturing
15.8%
12.2%
11.2%Primary industries
Share of Scotland’s private sector
business base by growth sector
*The growth sectors shown in the chart account for just under half (49%)
of the region’s business base, 42% nationally.
BUSINESSES AND ENTERPRISES  
As with Scotland overall, the region’s economy is dominated by small and medium
sized enterprises (SMEs) although this accounts for a higher share of employment
than nationally. The business base is diversifying, spanning a broad range of sectors
including food and drink, sustainable tourism, renewable energy, life sciences
(including marine biotechnology), creative industries, and space. In terms of economic
contribution, manufacturing and primary industries are regionally significant.
Businesses are resilient and innovative, underpinned by a strong entrepreneurial
culture. Social enterprises are more prevalent than elsewhere in Scotland, playing an
important role in realising local opportunity and supporting service delivery.
31%
17%
14%
8%
8%
8%
13%
Food and drink
Sustainable tourism
Energy (including renewables)
All private sector businesses
Financial and business services
Life sciences
Creative industries (including digital)
Page 10
242

Page 243

12.7 tCO2e per capita
7.8 tCO2e nationally
27% of domestic dwellings
have an Environmental
Impact Rating of C or
above 
41% nationally
6,236 ktC02e in 2019
15% of the Scottish total
Share of territorial GHG emissions
by source, 2019
Agriculture: 26%
LULUCF: 22%
Transport: 19%Domestic: 14%
Industry: 13%
Waste: 3%
Commercial: 2%
Public sector: 1%
The region
accounts for
52% of
Scotland’s
current
installed
renewable
energy
52%
Potential to
increase the
region’s
renewable energy
capacity
from 6,513MW to
33,205MW
Around half of Scotland’s 
woodland and more than 
three-quarters of Scotland’s
peatland is located in the 
Highlands and Islands
NET ZERO AND CLIMATE ADAPTATION   
The region is making progress in reducing greenhouse gas (GHG) emissions although
the pace of this does lag Scotland overall. Agriculture and Land Use, Land Use Change
and Forestry (LULUCF) account for a significantly higher share of emissions in the region
than nationally and addressing this is critical for both regional and national ambitions
around net zero. Energy transition will be core to lowering transport, domestic and
industry emissions, and the scale of retrofit required to bring commercial and domestic
properties up to appropriate energy efficiency standards presents both a challenge
and an opportunity. The region’s capacity for renewable energy generation, extensive
and growing, and the carbon sequestration potential of our natural capital, is pivotal to
meeting climate change targets for Scotland and the UK.
Page 11
243

Page 244

Page 12
244

Page 245

THE ROLE OF HIGHLANDS AND
ISLANDS REGIONAL ECONOMIC
PARTNERSHIP
The Highlands and Islands Regional Economic Partnership
(HIREP) was established in 2022. It  enables inclusive and
sustainable economic growth and builds resilience throughout
the region, by identifying and focussing on areas of joint
strategic purpose. It focuses on co-ordinated action in pursuit
of regional growth opportunities and to address shared
challenges. HIREP is a partnership of public, private, third
sector and academic organisations, working together to realise
the region’s economic potential in a sustainable and inclusive
way.
HIREP fulfils its purpose through: 
› Identifying opportunities for collaborative and co-
ordinated action in pursuit of agreed regional priorities,
ensuring, where appropriate, that stakeholders plans
are aligned, and resources are deployed efficiently and
effectively. 
› Advocating on agreed regional economic opportunities
and challenges and, where appropriate, leading in
discussions with Scottish Government, UK Government
and other organisations. 
› Being future focused in looking ahead to identify emerging
regional opportunities and challenges where collaborative
action can maximise outcomes and impact. 
› Working to understand evolving approaches to external
funding and reacting to maximise impact across all parts
of the region. 
› Understanding sub-regional economic dynamics and,
where appropriate, formulating solidarity actions to ensure
that no part of the Highlands and Islands is left behind. 
Membership of the HIREP includes local authorities, Highlands
and Islands Enterprise, Skills Development Scotland, Scottish
Funding Council, University of the Highlands and Islands,
Naturescot, Visit Scotland, Bord na Gaidhlig, HITRANS,
Cairngorm National Park Authority, The Crofting Commission,
business representatives and third sector organisations.
OVERVIEW OF THE REGIONAL
ECONOMIC STRATEGY AND ITS
DEVELOPMENT PROCESS
The Regional Economic Strategy galvanises collaborative
partner action in pursuit of shared ambitions, goals and
actions to deliver on the region’s potential. It builds on the
Scottish Government’s Regional Economic Policy review and is
informed by the National Strategy for Economic Transformation
(NSET).  It brings a regional focus and coherence to a strategic
landscape informed by a range of national strategies and
plans. These include strategies and plans relating to energy,
climate change and just transition, population, housing, digital,
innovation, community wealth building, rural and island
development, agriculture, land use and biodiversity.
This regional strategy also aligns with the strategies of member
organisations, focusing where collaborative action will yield
the best outcomes.
It charts how the region can capitalise on key opportunities
and assets to sustainably and inclusively grow the region to
reach its economic potential. It has been informed by diverse
research, analysis and discussion that has included: 
› a review of the existing research and strategies produced
by Highlands and Islands REP members, as well as other
relevant external research; 
› workshops involving HIREP members; 
› HIREP sub-groups on population, skills, housing, tourism,
childcare and community wealth building; 
› an online survey of stakeholders across the region in
November & December 2023 ensuring good level of
representation of business owners and private industry
leads, public agencies (at both regional and sub-regional
level) and community representatives.
› Online consultation on a draft strategy document, during
July and August 2024.
Page 13
245

Page 246

2. Our vision
for the region
in 2035
VISION STATEMENT
The Highlands and Islands is a dynamic,
connected, resilient and prosperous region
with a balanced and growing population and a
vibrant economy, embedding community wealth
building, leading Scotland’s transition to net
zero, and enhancing our natural environment. 
Page 14
246

Page 247

Increase in regional attractiveness and investment                     
Improved perceptions and understanding of the region Region is outward looking and well-connected globally                          
Increased regional cohesion and partnership
Businesses are
more innovative,
productive, resilient
and adaptable
Communities
prosper and are
more sustainable
The region is well
connected with
good quality and
secure services
GVA and average
incomes are
higher than the
national averages
The region is an
international
exemplar and has
extended
economic and
community benefit
from its transition
to net zero
Housing quality,
affordability and 
availability supports
population and
economic growth
The region has a
more balanced,
growing and skilled
population
FULFILLING OUR VISION – A SNAPSHOT OF THE REGION IN 2035 
Page 15
DRAFT
247

Page 248

3. The rationale
for change 
Establishment of Highlands
and Islands Development
Board (HIDB)
1965
Local government 
reform
1975
1970’s
Exploitation of 
North Sea oil
1970/80/90’s
Upgrading of 
transport 
infrastructure
1970’s onwards
Upgrading of 
telecoms infrastructure
2000’s
University of the Highlands
and Islands
2010’s onwards
Offshore Renewables
2020’s onwards
Net Zero
Page 16
248

Page 249

KEY DRIVERS OF CHANGE 
The Highlands and Islands is an adaptable and resilient region. It has a long history of leading
and responding to change, characterised by partnership working to grasp regional opportunities
and secure investment in much needed regional infrastructure and services. The next decade and
beyond will be no different, with change being a constant. The HIREP strategy and its delivery
is informed and guided by an understanding of the drivers of change and their specific, and
sometimes unique, impact on the region. 
Technology
and innovation Demographics
Land
Ownership
and Land
Use
Political and
societal
change
› Data innovation
and artificial
intelligence 
› Automation and
robotics 
› Digital
transformation 
› Cyber resilience 
› Circular economy 
› Migration 
› Working age
population 
› Increase in older
population 
› Low birth rates 
› Geographic
disparities
› Housing supply and
demand 
› Land use change
and natural capital
markets 
› Community
ownership and
wealth building 
› Land and
agricultural reform 
› Agriculture and
food production 
› Sustainable tourism 
› Constitutional
reform 
› Regulation 
› Community wealth
building 
› Consumer
behaviour 
› Cost of living 
› Increasing demand
for fair work and
remote and flexible
working
› Equalities 
› Climate adaptation
and resilience 
› Energy transition
› Biodiversity 
› Decarbonisation 
› Regulation 
› Community
engagement and
awareness
Climate
change
Page 17
249

Page 250

ANALYSIS OF THE REGIONS STRENGTHS, WEAKNESSES,
OPPORTUNITIES AND THREATS
An honest and timely assessment of the region provides the basis for a clear rationale for
change. This is framed by our understanding of the Strengths, Weaknesses, Opportunities and
Threats (SWOT) that shapes the goals and actions of the Strategy.  HIREP members have
drawn on their collective experience to understand the forthcoming decade of change across
the whole region and sought to identify the most significant economic opportunities together with
enabling infrastructure and services that will realise  the region’s potential. This has been tested in
consultation with wider stakeholders to ensure that HIREP’s collaborative action is focused where
it is most required and will make the most impact.
Page 18
250

Page 251

The Highlands and Islands is at the forefront of Scotland’s
economic transformation and transition to a net zero nation.
The mix of natural resources, established and emerging sectors,
culture, heritage, social capital and business know how
combine, to make a lasting impact on the region’s economic
performance, the lives of its people and communities, and the
natural environment.
Working together, the combined expertise, resources
and ambition within public, private, academic and
third sector partners, can be a catalyst for regional
transformation. Through collaboration, our leverage
in securing external public and private investment can
support development throughout the whole region.
Opportunities
Just
transition
to net zero
Scotland’s National
Population
strategy
Supply chain
opportunites
Importance
of place
Growth Deals and
Other External
Funding
Community lead
development
Existing green 
and blue 
economy
Regional
transformtonal
opportunities
Regional
Distinctiveness
(Cultural and
Heritage assets)
Growth sectors
Natural capital
Work anywhere
Existing
entrepreneurship
“Much of Scotland’s renewable energy
resource is in this region or its coastal
waters. Collective action is required to
secure, through influence, a favourable policy
and regulatory regime; a strategic approach
to infrastructure investments; regional
level skills development and region wide
community benefits.”
“Renewable energy and infrastructure
provides a fantastic opportunity for
jobs and sustainability, but there is a
risk that the local benefit is not
maximised and the socio economic
potential is not maximised”
Sense of place is strong in the Highlands and Islands,
with the region’s unique culture, environment and people
shaping future opportunities. These manifest themselves in
exciting prospects for our key sectors and for community
wealth building. Opportunities have been tested through
consultation with stakeholders and are those where a
collaborative regional approach can deliver the best
outcomes.
Page 19
251

Page 252

Renewable energy and Energy transition
The region currently accounts for over half of Scotland’s
installed renewable energy capacity and this capacity could
increase four-fold if all pipeline activity is realised, further still if
proposed developments progress. 
Reflecting this, HIREP members, and the broader consultation
process, recognised renewable energy as the primary
opportunity for the region. This includes capitalising on
renewable energy generation as a means for the region
to maximise its future potential, creating highly-skilled and
high-paying jobs in a rapidly growing sector. It also means
supporting evolution of the sector through technological
innovation, and ensuring the infrastructure exists in terms of
transport, ports and harbours, housing, academic expertise
and supply chain requirements, so that benefits can be
retained in the region.
Central to this opportunity is not only the expansion of
the renewable energy sector but also ensuring that local
communities benefit from its growth. Without specific action,
there is a risk that local benefits may not be maximised, despite
the region being a significant contributor to Scotland and the
wider UK’s renewable energy production.  Local communities
should derive tangible benefits from the renewable energy
assets in the region, contributing to more equitable growth
and community wealth building, addressing local needs and
enhancing community wellbeing. 
Sustainable tourism and hospitality
Sustainable tourism is a key opportunity that could benefit
the region across its varied geographies. While the visitor
economy is well-established in the region, sustainable tourism
has emerged as an opportunity for further growth, bringing
potential to support vibrant rural areas, employment creation
in rural communities and is key to the region’s just transition
to net zero. Visitor demand for the Highlands & Islands is
consistently strong, especially in international markets, and
is reinforced by a strong brand based on our unique culture,
heritage and landscape.
Future success will depend on our ability to achieve
balanced, sustainable growth of the visitor economy, creating
opportunities for communities and businesses to realise
benefits, while seeking to protect and enhance the environment
on which tourism depends. 
Food and Drink, and Primary Sectors including
Aquaculture
The region’s food and drink sector, built on our primary
industries, is well-established and has a unique reputation
with high value which is associated with our environment,
people, culture and provenance. It is rooted in the region’s
extensive land and marine assets and the work of farmers,
crofters and fishermen. A significant economic contributor,
employment stretches across the region. There are, however,
location specific clusters. Areas such as Islay and Speyside are
renowned for their whisky production, our islands and west
coast for aquaculture, while Moray is recognised for its crop
and animal production, and fish landings take place around
our extensive coastline.
To ensure a prosperous future for the sector and maximise
benefit to local communities, enterprises will have to adopt
new technologies, create higher value jobs and develop
sustainable products and business models.  Market insights
indicate that both future employees and customers will be
concerned about the low carbon footprint of food and drink
products and enterprises’ efforts to reduce their emissions. 
As producers of high value products, businesses have the
potential to be a forerunner in this. Regional greenhouse gas
baselining highlights the scale of opportunity in addressing
emissions from agriculture, land use and industry.
Life, Marine and Health Industries
The Highlands and Islands has multiple niche strengths in life,
marine and health sciences, built on unique natural resources,
growing academic expertise and innovative businesses.
We have anchor life science assets across the region in UHI
Shetland, the European Marine Science Park and Inverness
Campus, the latter included in the Inverness and Cromarty Firth
Green Freeport area.  Collaboration between stakeholders
and within clusters will be key to creating the conditions for
long term high value growth, for enterprises that are focused
on a range of markets, overseas and domestically, and tend
to pay above average salaries.  The Highlands and Islands
has advantages in areas including biotechnology, using the
regions natural resources, such as seaweed and timber, to
create high value products for the food, pharmaceutical and
packaging industries; as testbed for remote and sustainable
healthcare that delivers for sparse and dispersed population;
and leading animal health, aquaculture and agritech research,
development and innovation that ensures the sustainable future
for the region’s extensive marine and land based farming
sectors. 
2.86 million hectares of utilised agricultural
land, 54% of Scotland’s total
Page 20
252

Page 253

Heritage and Creative Industries
With well-established international brand recognition, our
region has strengths in heritage, provenance and storytelling,
creativity, Gaelic and other languages, and green credentials. 
The creative industries is the world’s fastest growing sector,
largely driven by transformational adoption of technology. In
the Highlands and Islands, it spans commercially successful
businesses as well community-based organisations, and is
buoyant across the whole geography, with clusters in many of
our islands. It is often strongly linked to distinctive local culture
e.g. Gaelic culture in Innse Gall and visual arts and crafts,
textiles and jewellery in Orkney and Shetland.
The region has a major opportunity to build on its international
reputation and many assets, with strengths in areas of largest
growth such as digital content, authentic traditional crafts,
digital heritage, environment and sustainability.  
Proportion of people aged 3+ with at least
some Gaelic Skills (2022)
Scotland
HIREP
Na h-Eileanan Siar
2%
9%
57%
Page 21
253

Page 254

Enablers and Challenges 
Realising our regional opportunities requires effective policy, investment and service delivery
across the region and requires a sharp focus, given the challenges of geography, demography,
infrastructure deficiencies and cost of service provision. Each of the enablers, identified by HIREP
members and through consultation, is a fundamental requirement for development and presents
challenges best addressed through collaborative action.  
Current factors
impacting on cost
of living and doing
business
High rates of
domestic and
business fuel
poverty youth outmigration
Housing affordability 
and availability
Low wages and
productivity
Declining town and
village centres
Rurality/remoteness
Transport and digital
infrastructre
Extreme weather
Lack of economic
diversity/sensitivity to
economic shocks
Declining public 
sector resorces
Shortages in skill &
skills provision
Perception on
compromise to be in
the region
Ageing population -
risk of demographic
crunch
Page 22
254

Page 255

Housing
Housing provision and availability across the region is a fundamental enabler of development, and
the current housing system is not operating in a way that supports economic development, community
resilience or population attraction and retention.
Fit for purpose and affordable housing, across all types and tenures, in the right locations, underpins
realisation of the region’s transformational economic opportunities by ensuring that worker
accommodation is available. It supports growth of the region’s SME base through provision of
housing in proximity to employment. It is also critical to community cohesion and resilience, given the
importance of housing availability for all residents and those providing key services.
The need for new housing investment across the region is matched by the need to invest in existing
housing stock to improve energy efficiency, address fuel poverty and contribute to a reduction in
greenhouse gas emissions.
The region’s housing challenge is multifaceted. Collaborative action by HIREP seeks to understand
and address barriers in the housing system, leading to investment in housing stock that meets the
needs of all parts of the region.
Na h-Eileanan Siar
Orkney
Shetland
Arran and Cumbrae
HIREP
Scotland
6.6%Argyll and Bute
Highland
Moray
4.7%
3.0% 4.5%
1.7% 3.8%
5.7% 8.0%
4.0% 5.6%
1.5% 7.5%
22.8% 4.9%
4.8%
0.9%
3.9%
3.4%
Proportion of dwellings that are vacant or second homes (2023)
Page 23
255

Page 256

Transport services and infrastructure
Effective transport infrastructure and services are critical to
connecting our businesses, communities and people with each
other and with the wider world. There are numerous transport
challenges across the region which can result in journeys with
low average speeds, low frequency and reliability issues.
Transport services are expensive to deliver over a large
geography and, in many parts of the region, reliance on
private cars exacerbates transport poverty. Specific challenges
include poor road networks, including trunk roads and other
main routes, limited electric vehicle charging infrastructure
requiring public investment to expand; limited public transport
options across much of the region including low frequency rail
services, infrequent and costly flights from the region’s airports
and ferry service challenged by reliability and resilience.
These challenges have multiple impacts. They can hamper
access to employment and public services, particularly
amongst low-income groups and they are a barrier to
businesses accessing supplies and markets.
Sustained investment in transport infrastructure and connected
services is required, not only to enable efficient, timely and
resilient services, but also to support the decarbonisation of
transport.
Digital Connectivity
Digitalisation is a proven driver of development, with equity of
access, at affordable cost, to high-speed connectivity being
a pre-requisite to delivering the ambition in this plan. Such
access is not yet universal throughout the region, leading
to a geographic digital divide and stifling the realisation of
opportunities in some, often remote or island communities.
As investment continues nationwide to deliver ever faster
broadband speeds, there is a need for continued public
investment to ensure that the region keeps pace with other
locations.  Across a region with dispersed population and
lengthy travel times between settlements, mobile connectivity
is equally important, while being challenging to deliver
effectively. Continued investment is required to deliver 4G and
5G connectivity outwith main settlements.
Improving digital access across the region is of paramount
importance to businesses, being a strong driver of innovation
and productivity. It is also fundamental to delivery of public
services, including education and health services which are,
increasingly, implementing digital service delivery models to
address the challenge of distance.
Alongside investment in physical infrastructure, there is a
continuing need to maximise the economic and social benefits
of digital through supporting business and social innovation. 
53% of premises are able to get a 5G signal outdoor
from at least one mobile network operator, lower than
the share at the Scottish (87%) and UK (92%) levels
Page 24
256

Page 257

Population and Shortage of labour 
Stable or growing population, particularly of working age
is a prerequisite to realising our economic ambitions and
sustaining vibrant communities. Depopulation is a significant
regional challenge , with decline in working age population
exacerbated by outmigration and the impact of Brexit. 
Population of working age has decreased more rapidly
between 2011 and 2022 in the Highlands and Islands  than
Scotland and almost a quarter of the population in the region
are of retirement age. There is also unevenness of population
distribution across the region. The opportunity afforded
by digital connectivity to “work anywhere” in certain jobs
is potentially an opportunity for the region but is heavily
dependent on addressing the issues that determine regional
attractiveness.
Population challenges are acknowledged as cross-cutting
and complex,  impacted by interlinked factors such as access
to affordable housing, available public transport options,
effective digital connectivity, access to core services such
as health, social care and childcare, education and training
options and long term employment and career opportunities
Labour shortages have become more prevalent in the past few
years, impacted by Brexit and the pandemic, and have been
more acute in sectors such as tourism and hospitality, food and
drink, construction and health and social care.  Challenges
are also more persistent in more rural and island areas. Lower
wages are an inhibiter to attracting population so increasing
fair work and wage rates are key.
There is an overriding need to reverse depopulation and
thereby increase access to labour, through systemically
addressing its causal factors to make the region a more
attractive place to live, complemented by a regional effort to
support talent attraction, upskilling and reskilling, and reducing
economic inactivity.
Skills shortages
Labour and skill shortages are interlinked but come with their
own unique challenges. While labour shortage makes it
harder to find people to hire, skills shortage makes it harder to
find the right people.
The region has long-standing skills gaps and skills shortages
which will continue, partly driven by the changing nature
of skills in workplace such as digitisation. For our future and
current workforce, the skills required to enter and progress in
work are also changing. Alongside the possibilities for skills
and labour attraction to the region through various sectoral
opportunities, for example renewable energy, life sciences
and aquaculture,  change will be required within the skills
system  to deliver sufficient numbers of skilled people, not only
to realise our economic opportunities but to ensure that service
delivery in the foundational economy, for example health and
social care,  is supported.
The gender pay gap was 4.5% in
2023, compared to 1.7% nationally
and 7.7% across the UK
“Depopulation is often linked to the other
challenges listed in this consultation, such
as housing, cost of living and employment
opportunities. Many younger people, those most
likely to be economically active, leave the island
for better housing and employment prospects.
Reversing the trend of depopulation should be
a central focus of any Highlands and Islands
Economic Strategy.”
Page 25
257

Page 258

Energy
While the regional opportunities from energy transition are
evident, there are also challenges. The transition to net zero
will require a mix of public and private investment in enabling
infrastructure. The scale of such investment is beyond the
capacity of the REP and its members. There is, however, a
crucial role to play in identifying and evidencing the need for
infrastructure, working collectively to aggregate data, and
advocating for investment. Such investments have the potential
to generate considerable community benefit, the challenge
being to secure benefits of appropriate scale and maximise
resulting community and regional impacts.
Furthermore, the cost of energy presents a substantial issue
for both local communities and private businesses, especially
for those without access to mains gas. Consequently, these
individuals and businesses are often reliant on more expensive
energy sources for heat, such as oil and electricity. High
energy costs are a particular issue for business. While the
cost of energy is outwith its direct control, there is a potential
advocacy role for the REP.
Natural habitat and climate change
The Highlands and Islands faces substantial challenges
as a result of climate change, and the potential impact on
the natural environment, local communities, transport and
infrastructure and local businesses. Key risks as a result of
climate change include loss of coastal communities and
natural resources as a result of rising sea levels and coastal
erosion; increased frequency and intensity of extreme weather
events; and  loss of biodiversity and habitat degradation, with
impact on fragile ecosystems such as peatlands and marine
environments  
We need to take action to reduce the region’s carbon footprint.
Research details the scale of emissions from land use and
agriculture. It points to the need for changing agricultural
practices and investment in restoration of natural habitats
(particularly peatlands and native woodlands). Whilst clearly
a challenge, carbon reduction also presents opportunity in
the form of environmental enhancement and nature-based
business and job opportunities. There is also potential for
significant community benefit to be derived from natural capital
investment at regional scale over the long term.
Even if the region can collectively deliver net zero, our climate
is likely to continue to change with warmer drier summers,
warmer wetter winters, and more extreme weather events –
storms, floods, droughts. A risk-based approach to climate
change adaptation will be essential.
This is a cross-cutting challenge which not only has potential
consequences for the opportunities identified such as for
sustainable tourism and life, marine and health sciences, but
also the potential to exacerbate other challenges including
disrupting transport and infrastructure and contributing to
further depopulation. 
The Highalnds and Islands
has 86% of Scotland’s
coastline, 61% of the UK’s
Page 26
258

Page 259

Accessible public and private services across the region
The availability of services across all parts of the region is central to the ability to
retain and attract population. Delivering such services across the Highlands and
Islands is logistically challenging and costly. The need to deliver over distance
and the lack of scale economies, given small and dispersed populations,
requires innovation, partnership and significant resources. 
Services include childcare, social care, cultural and leisure services, along
with education and health services. While these are often the responsibility
of individual HIREP partners, there is merit in regional learning and potential
collaboration to develop and deliver services using new and innovative models.
We need to build on our improving connectivity and recognised expertise in
partnership delivery of services. The OECD in its rural innovation work has
recognised the healthy state of social innovation and role of social enterprises
in service provision, especially across remote mainland and island communities.
Such partnerships should be enhanced, with HIREP having a role in building
partnerships and sharing good practice across the region. A collective regional
voice articulating what works most effectively in service delivery across the
HIREP geography and the investment required to deliver is needed.  
CONCLUSION
Focusing on these opportunities and enablers is key to achieving our vision, alongside a need to ensure these are clearly
understood by governments and investors. Infrastructure investment is fundamental, requiring a long-term approach and
innovation, especially to be appropriate for our geography and dispersed populations and businesses.
Whilst our goals and actions are shaped around where we can combine our efforts to do more and achieve more for the
region, there is an overarching requirement for collective and consistent promotion of the benefits and evidence of the needs
of the region to help secure its vital continued contribution to the sustainable and inclusive growth of Scotland and the UK. 
‘It is important to maintain,
and preferably expand on,
the current provision of
services which are viewed
as key to sustaining a
viable community. If the
island’s population falls
further it could jeopardise
key services and further
accelerate the process of
depopulation, with the
school, GP surgery, shops
and businesses potentially
shutting as a result.”
Page 27
259

Page 260

4. Goals and
actions
Page 28
260

Page 261

Introduction
The Strategy sets out clear goals and associated
actions requiring regional collaboration to deliver
our Vision. Actions considered best delivered at
a local level are not incorporated but HIREP will
remain agile and consider additional actions if
required as part of biennial delivery plans.
Page 29
261

Page 262

HIREP Vision Statement
The Highlands and Islands is a dynamic, connected, resilient and prosperous region with a balanced and
growing population and a vibrant economy, embedding community wealth building, leading Scotland’s
transition to net zero, and enhancing our natural environment.
Our Goals Cross Cutting
Themes
Increase the profile 
and understanding 
of the Highlands
and Islands to support
effective policy 
and unlock
regional investment
• Enhance the regional evidence base to support advocacy
and business case development
• Bolster advocacy efforts with national government to
better highlight the region’s unique needs
• Identify new ways to deliver public services across
the region, including through use of technology and
innovative partnership delivery models
Become a region which
delivers high quality and
affordable housing for
residents
• Improve the functioning and responsiveness of the housing
“system” to emerging needs in the Highlands and Islands
• Support the revitalisation of rural areas by increasing
access to high-quality housing across the entire region
Enhance the region’s
transport and digital
infrastructure
to become an exemplar
of efficient rural
connectivity   
• Improve transport connectivity for local residents,
businesses and visitors by increasing the availability,
reliability and affordability of public transport
• Pursue innovation in technology and service provision
to deliver enhanced and more resilient and sustainable
transport connectivity across the region   
• Increase the level of access to high-speed connectivity
across the region
Build resilience and
competitiveness
through place-
based opportunities
and stimulating an
active culture of
entrepreneurship and
innovation
• Stimulate an entrepreneurial and innovation-active culture
within the region
• Support new opportunities to enable growth and
resilience in our priority sectors
Maximise the economic
and community benefits
from renewable energy
investments and drive
the region’s move to
net zero and climate
resilience/adaptation
• Maximising the economic and community benefits from
renewable energy development
• Actively work towards safeguarding and enhancing the
region’s natural capital
Community W
ealth Building / Benefit
Innovation and Entrepreneurship
Population
Just Transition
Develop a coordinated
response to skills and
labour requirements
across the region
• Develop a shared understanding of labour and skills
needs
• Protect and build on the best of provision
• Workforce Attraction and Retention
Page 30
262

Page 263

To deliver these goals, HIREP
will put appropriate governance
arrangements in place, including
the alignment of some existing
regional specific groups, to
provide clear ownership of both
development and delivery of
agreed actions.
CROSS CUTTING THEMES  
The Strategy has identified four cross-cutting themes considered
fundamental to meeting our goals and adding value to our
actions:
Community Wealth Building and Benefit 
› The region has a strong and proud history of extensive
community-led development and action. Community
Wealth Building (CWB) is pivotal to a successful place-
based approach to socio-economic development and
actions will be woven into HIREP’s response to regional
opportunities and will contribute to addressing, in part, key
enablers. It is recognised that community-led development
is a powerful mechanism for population retention. 
› The understanding of CWB principles differs within HIREP
partners and implementation across the region is at
different stages. Building on development of a common
understanding, HIREP’s focus will be on the identification
of CWB actions that are most effectively delivered at
regional scale, for example community benefit from
energy and other investments, natural capital benefits, and
procurement approaches.
› Sharing strategic community benefits is a core component
of CWB. The potential scale of community benefits
arising from major investments, including onshore and
offshore wind developments, transmission infrastructure
investments, and, in the longer term, natural capital, could
yield considerable sums across the region. Considering
common objectives and guiding principles in securing,
managing and investing strategic community benefit funds,
at the local authority level, can support long lasting and
sustainable impact.
Page 31
263

Page 264

Innovation and Entrepreneurship 
› The region has embraced innovation and championed entrepreneurship over decades,
wielding it to respond to both the challenges and the distinct opportunities created by our
geography and natural and cultural assets. 
› Extensive social innovation, aided by the region’s high levels of social capital and number
of inclusive, democratic business models, has been impactful in finding novel ways of
delivering community services and benefits. The OECD, in its recent work on innovation
in rural areas, highlighted the powerful impact of social innovation on development in the
Highlands and Islands and recognised the solid foundation on which to build. 
› Innovation is key to improving productivity, competitiveness, profitability and
entrepreneurship. The drivers of change will require the region to adopt and exploit
technology, data, artificial intelligence and advanced innovation.  Embedding these across
the strategy, diversifying, and developing entrepreneurial skills and knowledge will increase
resilience and broaden the economic base. 
550 businesses and 31 social enterprises per
10,000 resident adults (380 and 13 nationally)
Page 32
264

Page 265

Population
› The Highlands and Islands has experienced periods of
significant population decline throughout its history which
have resulted in successive governments and the European
Union recognising the need for strategic support. With
the 2022 Census indicating that every part of the region
has experienced a decline in working age population,
although more keenly felt in the islands and the North
mainland, the strategy recognises the core need for
significant investment in people, infrastructure, businesses
to tackle this challenge.  The region's greatest asset is its
people.  They are intrinsic to realising our ambitions and
creating the conditions for population growth requires
actions across all the goals in the strategy.
Just Transition 
› Scotland’s ambition to achieve net zero emissions by
2045 has far reaching implications for the Highlands
and Islands and its people, communities and businesses.
The positives include the renewable energy opportunities
that are evident in the region are critical to achieving
national ambition, and the extent and capacity of our
natural capital both to sequester carbon whilst generating
economic opportunity and good biodiversity outcomes. 
› The challenges are illustrated by the need to reduce the
emissions impact of agriculture and land use, and the
scale or work required to decarbonise domestic and
commercial heating. 
› The change required will require good data, collaboration,
careful planning and delivery to ensure that benefits are
shared across all geographic areas and interest groups
and that costs do not fall disproportionately on particular
areas or groups. Each of the regional opportunities and
enablers / challenges includes a net zero component to
be addressed in a “just” way.    
31% of domestic properties are reliant on high
carbon fuels for heating, 8% nationally
Page 33
265

Page 266

OUR STRATEGIC GOALS AND ACTIONS
Goal 1: Increase the profile and understanding of the Highlands and
Islands to support effective policy and unlock regional investment
A powerful regional voice, supported by robust evidence detailing the opportunities and challenges in all parts of the region, is
needed to exert effective policy influence and secure external public and private funding to further our regional ambitions. Using
our collective knowledge and resources to shape innovative solutions, responding to unique situations across the region will
demonstrate the value of place-based approaches.
Sub-goal 1.a: Enhance the regional evidence
base to support advocacy and business case
development
Actions
› Progress a regional economic intelligence hub to increase
access to. and use of. regional data and intelligence.
› Collectively strengthen the evidence base through
research, analysis and evaluation, to support and inform
action across all strategic goals, with initial focus on
housing, transport and transition to net zero.
› Develop a new regional approach to attracting investment
through promotion of the region’s assets and opportunities,
working collaboratively to identify and progress inward
investment opportunities.
Sub-goal 1.b: Bolster advocacy efforts with
national government to better highlight the
region’s unique needs  
Actions
› Advocate for and develop alternative ways of funding
and providing key public and private services in the region
(e.g. childcare) 
› Develop and communicate a clear HIREP position in
regional, rural and island policy and funding discussions
with governments, to secure effective policy and maximise
resources to realise regional opportunities
› Advocate for the region on key issues impacting on
realisation of our regional vision and achievement of
strategic goals, strengthening and ensuring a common and
consistent voice for the region.
Sub-goal 1.c: Identify new ways to deliver public
services across the region, including through use
of technology and innovative partnership delivery
models  
Actions
› Reflect on existing national systems and policies which
impact on the implementation of the strategy and identify
those which are not currently delivering for the region,
developing alternative proposals for wider consideration.
› Design and implement innovative service delivery models,
building on the region’s high levels of social capital,
expertise in social innovation and existing public / private
delivery model collaborations
› Recognising the creation of a new national Planning
Hub, identify where regional partner collaboration can
further support HIREP Planning Authorities in making
timely decisions that support key economic drivers such as
housing, transport and renewable energy.
Page 34
266

Page 267

Goal 2: Become a region which delivers high quality and affordable
housing for residents
Enhancing local housing options is crucial for community sustainability and resilience. Providing residents with a quality home
creates a foundation for long-term wellbeing, fosters stronger communities and is critical for attracting population.
Sub-goal 2.a: Improve the functioning and
responsiveness of the housing “system” to
emerging needs in the Highlands and Islands
Actions
› Working with Local Authorities and Housing Associations,
empower and support community housing trusts to build
capacity to take forward feasibility work and develop
propositions for community led housing developments. 
› Explore the establishment of a regional demonstration
project to test new approaches to addressing housing in
rural locations, governed by a committed partnership of
public, private and community representatives.  Use the
learning to inform region-wide solutions 
› Consider and raise awareness on where housing policy
and regulation could usefully be rural proofed and
adjusted to allow local authorities to more flexibly use their
funding to respond to island and rural needs.
Sub-goal 2.b: Support the revitalisation of rural
areas by increasing access to high-quality housing
across the entire region
Actions: 
› Increase the construction of more affordable housing of all
tenures, ensuring dispersal of provision across rural areas,
and consider how publicly owned and crofting land can
contribute to this. 
› Repurpose vacant homes and holiday rentals by
encouraging occupancy / utilisation as permanent
primary homes and exploring different mechanisms,
including new tax models, to promote change. 
› Champion energy-efficiency by encouraging the
construction of energy efficient housing as well as
upgrading the existing housing stock.   
› Recognising the challenges faced by SMEs in the
construction sector operating in rural areas, work with
the sector to build its resilience, aided by a more certain
pipeline of proven housing developments.
› Consider the need to pilot short-term accommodation
solutions to alleviate pressures in key locations.
Page 35
267

Page 268

Goal 3: Enhance the region’s transport and digital infrastructure to
become an exemplar of efficient rural connectivity   
Connecting people, communities and businesses to employment, services and markets, physically and virtually, is a prerequisite
for development. Transport that is reliable, resilient and affordable, provides effective connections across the region and connects
the region to the wider world. Digital connectivity is a gamechanger, for access to services and markets. Both open up business
opportunities and makes the region an attractive place to live, work and visit.
Sub-goal 3.a: Improve transport connectivity
for local residents, businesses and visitors
by increasing the availability, reliability and
affordability of public transport across the region.
Action(s):  
› Work with HITRANS, ZetTrans and SPT to support the
development and delivery of their RTS Action/Delivery
Plans, which include road, rail and ferry infrastructure and
service enhancements, improved integration across travel
modes and exploration of fixed link options   
› Revitalise efforts to deliver against commitments made
regarding strategic road enhancements, including A9 and
A96 dualling and A82, A83 and A85, and to improve
road quality and safety, unlocking regional economic
potential.  
› Support the case for improvements to air and ferry
services to meet the needs of communities and businesses,
considering new and enhanced services and future
infrastructure investment requirements.
Sub-goal 3.b: Pursue innovation in technology
and service provision to deliver enhanced
and more resilient and sustainable transport
connectivity across the region.   
Actions:  
› Future-proof regional car infrastructure by developing
electric and low carbon opportunities, ensuring that
funding and delivery models are reflective of the
challenges in rural parts of the Highlands and Islands.
Ensure that the necessary skills are in place within the local
supply chain to deliver and maintain infrastructure. 
› Build on the success of the Sustainable Aviation Test
Environment (SATE) project, to capitalise on emerging
decarbonisation opportunities in the aviation sector
positioning the region as an early adopter of new
technologies for the movement of people and goods. 
Consider how the specification of PSOs can be critical in
the transition to the Highlands and Islands becoming a net
zero aviation region.
› Widen the use and awareness of Demand Responsive
Transport (DRT), particularly for rural communities which
currently have limited or no regular scheduled bus
services, taking learning from projects such as Moray
Council’s m.connect DRT service using an app-based
booking system. 
› Widen understanding and application of hybrid and
electric ferry operation within the region, building on
existing and emerging investments. 
Sub-goal 3.c: Increase the level of access to high-
speed connectivity across the region  
Actions: 
› Maximise delivery of Scottish Government (R100) and
UK Government (Project Gigabit) programmes to increase
availability of high-speed connectivity to all parts of the
region
› Proactively encourage more private and public sector
collaboration to develop better digital infrastructure across
the region. 
› Identify ways of facilitating access to affordable and fast
internet connectivity in communities that are not in current
rollout plans and enact these within a reasonable time
frame.
Page 36
268

Page 269

Goal 4: Build resilience and competitiveness through place-based
opportunities and stimulating an active culture of entrepreneurship
and innovation
A place-based approach focusing on areas of opportunity and supporting clusters, recognises and builds on our regional
competitive advantage. Enhancing entrepreneurship and encouraging business innovation builds resilience, increases productivity
and results in more competitive businesses able to offer higher paying jobs. There are benefits from focusing on the untapped
potential of under-represented groups such as women and young people.
Sub-goal 4.a: Stimulate an entrepreneurial and
innovation-active culture within the region 
Actions: 
› Develop and facilitate new opportunities for peer-to-
peer learning and networking across the region, and
nationally/internationally through learning journeys, to
support entrepreneurs in all stages of their journey.
› Consider regional campaigns and programmes to
promote entrepreneurship in education. 
› Increase regional alignment from external funding to
increase effectiveness and efficiency of enterprise support
and innovation.
› Build on the national innovation strategy to support 
opportunities where the region has a distinctive
competitive advantage, increasing the number of spin outs,
and extending the adoption and diffusion of innovation
› Maximise the regional benefit of national innovation
projects such as NMIS, enhancing their visibility, reach
and impact across the region
Sub-goal 4.b: Support new opportunities to
enable growth and resilience in our priority
sectors
Actions: 
› Enable enterprises to capitalise on opportunities,
especially from digital technology, international markets,
and supporting the transition to Net Zero.
› Explore the benefits and delivery models for regional
cluster approaches which are appropriate for the region’s
unique geography and can stimulate innovation to support
our regional transformational opportunities, 
› Ensure delivery of wider economic and community
benefits to the visitor economy around the investment in
growth deals. Seek to identify a pipeline of potential future
strategic investments. 
› Support key Gaelic speaking communities with
interventions to promote socio-economic opportunities
and enhance resilience.
Page 37
269

Page 270

Goal 5: Maximise the economic and community benefits from
renewable energy investments and drive the region’s move to net
zero and climate resilience/adaptation 
The region is at the forefront of Scotland’s transition to net zero, being home to much of Scotland’s renewable energy resource and
natural capital. Safeguarding and strategic use of this natural resource will generate long-term value, retained in the region, with
actions to ensure that businesses, communities and individuals across the whole region benefit. 
Sub-goal 5.a: Maximising the economic and
community benefits from renewable energy
development
Actions: 
› Develop and implement common regional objectives and
guiding principles to securing and distributing strategic
community benefit funds at a local authority level. Support
the scaling and growth of local supply chains through the
aggregation of place-based demand/sharing of data, to
ensure that existing businesses can pivot positively whilst
also attracting new entrants to the market.
› Identify and fill capacity and capability gaps through
targeted inward investment and diversification to capture
benefits within the region
› Secure investment in our ports and harbours and advocate
for investment in other enabling infrastructure ensuring
that the region can fully and robustly contribute to
decarbonisation targets and maximise the regional benefit
of doing so. Ensure that all investments are proactively
screened for climate risks, both current and future.
› Support innovation and the development of new
technologies such as marine energy technology and
floating offshore wind, where the area has a natural
advantage and opportunity to take a leading role.
› Seek to influence a regulatory, market and consenting
framework that recognises the strategic importance of our
region, supports all renewable energy sectors, reduces
project delivery risks and increases private sector finance.
Sub-goal 5.b: Actively work towards
safeguarding and enhancing the region’s natural
capital 
Actions: 
› Incorporating a natural capital approach to regional and
local decision making by enhancing public awareness
of its natural resources and understanding the risks and
benefits of nature-based solutions e.g. flood management,
coastal and marine management, naturalising
watercourses, peatland restoration, native woodland
protection and enhancement. 
› Increase awareness of the existing natural capital of the
region as a source of growth and build on existing work to
identify ways in which local communities benefit from this
investment, 
› Place special emphasis on the restoration and
conservation of local peatlands, and protecting,
enhancing and creating extensive native woodlands.
Championing this proactively enables the safeguarding
the region’s natural habitat and makes a major
contribution to delivering our net zero ambition. 
› Proactively anticipate and strategically plan for the
possible impact on communities of flooding and rising sea
levels. Where feasible, the use of innovative adaptation
solutions which preserve communities and services should
be prioritised.
Page 38
270

Page 271

Goal 6: Develop a coordinated response to skills and labour
requirements across the region
Our region requires people with the right skills to realise regional opportunities and support the foundational economy.
Understanding and responding to future skills and labour needs gives businesses confidence they can access the skills they need,
enables effective provision of services and provides individuals with pathways to well-paid work and career fulfilment in the
region.
Sub Goal 6.a: Develop a shared understanding of
labour and skills needs
Actions
› Develop and communicate a greater understanding of
need and emerging economic opportunities through a
shared evidence base developed to inform regional /
local provision.
› Develop proposals to align Investment in skills with
socio economic need, prioritising agreed economic and
foundational economy requirements, working with the
skills system to respond.  Our combined investment in
post school skills should focus on both supporting skills
development and economic growth.
Sub-goal 6.b: Protect and build on the best of
provision
Actions
› Maintain and expand the best of provision capitalising on
growing the workforce in response to short and medium
term employment opportunities and supporting workforce
development. 
› Support and grow the best of our Academic Pathways,
reflecting regional/local strengths and opportunities.
› A greater commitment to Work Based Learning in
response to employer needs, resulting in greater access
locally. 
› Develop the current workforce through upskilling and
reskilling, ensuring our people and businesses thrive.
› In response to the working age population challenge,
changing nature of work and business models, focus our
efforts in addressing need through work-based learning
in a number of agreed priority sectors, important to the
regional economy.
Sub-goal 6.c: Workforce Attraction and Retention
Actions
› Commitment of regional partners commit to adopting
work-based learning into workforce planning, providing
a step change in opportunities across the region with the
public sector to earn and learn. 
› Develop proposals to build on existing strengths
of partners, including FE/HE alumni, Graduate
Apprenticeships and co-delivery of provision with industry
to promote regional opportunities and attract talent.
› Work with UHI to ensure they are ably resourced to
support the regional skills and education requirements
(e.g. of the generational opportunities presented by the
Green Freeport, offshore wind, and wider infrastructure
investments, as well the potential development of a
gateway programme to support recruitment in medical
professions in remote and rural areas of the Highlands and
Islands).
Page 39
271

Page 272

5. Delivering Our
Strategy 
DEVELOPING AN ACTION PLAN FOR DELIVERY 
Our regional strategy will guide the collaborative work of HIREP, working to a ten year
timeframe with wider partners and stakeholders. Sitting alongside this strategy, a detailed
delivery plan, refreshed every two years, sets out the key steps and the milestones to progress
our goals and associated actions. It includes: 
› Roles and responsibilities for the HIREP, officers’ group and HIREP subgroups, aligned to the
Strategy’s goals. 
› The role of the regional intelligence hub in providing research, analysis and evaluation
support to evidence the case for action and “measure” progress. 
› The potential role that external investment may play in realising our collective goals. 
› The role that advocacy will play – the HIREP as a powerful voice for the region, in discussion
with governments and others.
MONITORING PERFORMANCE 
We have identified a number of high-level indicators which, taken together, will demonstrate
progress over the long term. These have been chosen to help support monitoring of our goals
and actions and progress towards realising our vision. They will assist HIREP in understanding the
region’s progress in relation to the National Performance Framework. Complementing these will
be further milestones and measures detailed in the two-year delivery plan.
Page 40
272

Page 273

The region
has a m
ore
balanced,
grow
ing
and skilled
population
Com
m
unities
prosper and
are m
ore
sustainable
GVA
and
average
incom
es are
higher than
national
averages
Housing
quality,
affordability
and
availability
supports
population
and econom
ic
grow
th
Businesses
are m
ore
innovative,
productive,
resilient and
adaptable
The region
is w
ell
connected
w
ith
good
quality
and secure
services
The region
is an
international
exem
plar and
has extended
econom
ic and
com
m
unity
benefit from
its
transition
to
net zero
Increase in regional population
✓
✓
Increase in working age population (16 - 64)
✓
✓
Increase in those aged 16-64 with at least the equivalent of a higher national diploma
qualification (SCQF level 8)
✓
Access to services
✓
✓
Community satisfaction – sense of belonging
✓
Increased no. of enterprises with inclusive business models
✓
✓
Increase in regional GVA
✓
Increase in regional average incomes (relative to national averages)
✓
✓
Increase in jobs paying above Real Living Wage
✓
Decrease in second homes and vacant properties
✓
No. of dwellings above a selected threshold of ‘Housing quality’
✓
Energy efficiency – No. of dwellings with environmental impact rating of C or above
✓
✓
Proportion of house completions (HIREP:Scotland)
✓
Proportion of businesses which are innovation active
✓
Increase in BERD and HERD
✓
Increase in GVA per hour worked (or per FTE)
✓
Business start-up / survival rates
✓
Residents’ satisfaction with public transport
✓
Passenger journeys by region for local bus services
✓
Access to full fibre broadband (residents and business)
✓
Access to 5G
mobile
✓
Overall emissions declining by source (e.g. agri, land use, domestic…etc)
✓
Renewable energy generation (mega, giga watts)
✓
Developer contributions to community benefit re- offshore wind
✓
✓
Natural Capital Asset Index (NCAI) (monitors the quality and quantity of terrestrial
habitats in Scotland)
✓
Page 41
273

Page 274

HIREP Members
Page 42
274

Page 275

Page 43
275

Page 276

DRAFT
276

Page 277

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet
Title: Lochshore Disability Employment Hub
Purpose: To seek approval for the creation of a Disability Employment Hub
at Lochshore Park, within the Garnock Valley, offering a wide
range of opportunities for people with disabilities and long-term
health conditions to develop skills for employment. 
Recommendation: That Cabinet approves the proposal to create a Disability
Employment Hub at Lochshore Park to deliver opportunities
which will improve outcomes and contribute to reducing the
disability employment gap. 
1. Executive Summary 
1.1 The Employability and Skills Team deliver a flexible and inclusive service to assist
residents to get back into work, start work for the first time or take the next step on the
career ladder. Operating under the Your Next Move Working North Ayrshire brand, this
hybrid model integrates in-house and external provision aligned to the Scottish
Government's No One Left Behind (NOLB) policy and the employability pipeline
framework. This approach is enhanced by a Keyworker approach to deliver person-
centred support to address barriers to employment. 
1.2 A key initiative within Your Next Move Working North Ayrshire is the Equal Programme,
which focuses on supporting individuals with disabilities and long-term health
conditions. Currently, this programme operates across multiple sites including Trinity
Church and Eglinton Park, where trainees engage in hands-on work experience in
areas such as horticulture and bike maintenance. 
1.3 The proposal seeks to relocate the Trinity Church and Eglinton Community Garden
operations to a new centralised Disability Employment Hub at Lochshore Park to
enhance opportunities, increase reach and improve outcomes for people supported.
This will increase the opportunities for trainees to engage in meaningful work
experience and will also provide opportunities for independent travel supported by
public transport options. The proposal seeks to maximise the potential for partnership
with local organisations and employers to enable collaboration that benefit the local
community, the trainees and the local economy. It also aligns with Lochshore’s focus
on wellbeing and green economy principles. 
2. Background 
2.1 The Employability and Skills Team deliver a wide range of interventions to support
residents to get back into work, start work for the first time or take the next step on the
career ladder. A hybrid model branded Your Next Move Working North Ayrshire, this
includes in-house and contracted delivery and delivers a flexible, inclusive and
responsive employability services across North Ayrshire.
Agenda Item 13
277

Page 278

2.2 The service engages with people of all ages aligned to the national Employability
Pipeline Framework to support the effective delivery by addressing barriers to
employment, offering vocational training opportunities, providing job matching support
and ongoing in-work support. A keyworker, assigned to every participant, provides
person centred support throughout the employability journey. The programme is funded
by North Ayrshire Council, the Scottish Government No One Left Behind (NOLB)
funding and the UK Government’s Shared Prosperity Fund. 
2.3 The Scottish Government’s NOLB Partnership Agreement for Employability with local
government aims to create a responsive employability system in Scotland. The
Partnership Agreement aims to reduce inequalities in the labour market and to help
people of all ages find work. The NOLB Employability Strategic Plan is delivered in
partnership between the Scottish Government and Local Authorities. This: 
• Outlines the key priorities and aims to help people prepare for education, training,
employment, and volunteering.
• Aims to provide support to unemployed and inactive people to improve their life
chances through service delivery underpinned by the following principles: person-
centred, integrated, evidence-based and easy for people to navigate.
• Offers support to people regardless of age or background, including people with
disabilities, people with convictions, care-experienced young people, single parents,
minority ethnic people and people living in deprived areas. 
2.4 The North Ayrshire Local Employability Partnership (LEP) oversees and guides
employability provision in North Ayrshire. It aims to support the implementation of local
and national employability policy and make best use of resources to deliver
employment outcomes for people of all ages while focusing resources where the need
exists most. The LEP ensures a co-ordinated approach across key partners aligns
provision, maximises impact and targets resources to key priority groups. These
include young people, people who are long term unemployed, parents from the key
priority family groups and people with disabilities and long-term health conditions. The
North Ayrshire NOLB Delivery Plan outlines the key actions to support delivery. 
2.5 Delivery is currently supported through Employability Centres located in Ardrossan,
Irvine and Stevenston as summarised below. In addition to these centres, Keyworkers
meet individuals in community centres or other suitable locations throughout North
Ayrshire to ensure the service is accessible, flexible and responsive: 
• Ardrossan: Parental Employment Hub;
• Stevenston: Youth Employment Hub; and
• Irvine: Equal Programme, Disability Employment Hub and CEiS Employment Hub. 
2.6 This proposal seeks to relocate the Equal Programme from Trinity Church and Eglinton
Community Garden a new centralised Disability Employment Hub at Lochshore Park,
Kilbirnie. This will establish a dedicated Employability Centre in the Garnock Valley as
there is currently no formal centre in this area. Lochshore Park offers an ideal setting
for this purpose, providing a rural, wellbeing-focused environment with open green
spaces that would provide an optimal environment for a Disability Employment Hub. 
2.7 Lochshore Park has benefited from major regeneration, Community Wealth Building,
placemaking investment and is identified as a key priority. It provides a regional outdoor
visitor destination, health and leisure opportunities, active travel connections, play
facilities alongside community and business opportunities. It is a flagship project in
demonstrating the Council’s Community Wealth Building ambitions and the desire to
278

Page 279

develop an inclusive and green economy with wellbeing and climate change principles
being central to the project and any future development. The project plays a key role in
supporting economic recovery and renewal and creating new jobs. 
2.8 The Lochshore Masterplan was developed through extensive community and partner
consultation and engagement, reflected in the establishment of the Lochshore
Development Group as an advisory body. The regeneration proposals have been, and
will continue to be, co-produced with the local community and partners. The partnership
approach proposed between the Employability and Skills team and the groups
established at Lochshore would increase capacity for existing stakeholders and provide
opportunities for training and employment, within a work setting. 
2.9 The Hub would be operated by the Equal Programme, which supports people with
disabilities and long-term health conditions to prepare for and progress to employment.
The Equal Programme is an accredited SQA centre through which the team provide a
range of activities for the target group to engage, gain qualifications and progress to
employment, offering a drop in facility as well as structured training. The team are
trained and equipped to support people with disabilities and in the last year job
outcomes have increased significantly, contributing to the Scottish Government’s aim of
halving the disability employment gap. 
2.10 The Department for Work and Pensions (DWP) have advised that there are 199 people
with a limited capability for work and 81 customers seeking employment with a health
condition in the Garnock Valley. This relocation proposal would offer locally based
support to enable this group of individuals to be able to access support from the
services delivered by the Equal Programme. A referral pathway is in place to support
these referrals, in addition to the existing caseload and ongoing referrals from North
Ayrshire residents. 
2.11 The Equal Programme currently operates from Trinity Church, Irvine and within
Eglinton Community Garden, Kilwinning offering horticulture training and has a bike
maintenance initiative based in Eglinton Country Park. These initiatives provide
trainees with opportunities to volunteer and gain paid work experience as they work
toward accredited qualifications and prepare for future employment. Locating the Equal
Programme activities in one location at Lochshore Park would offer space to develop a
broader range of activities, increased opportunities for partnership working with local
organisations, enterprises and businesses, alongside increased opportunities for
trainees to gain meaningful work experience. 
2.12 The creation of a Disability Employment Hub at Lochshore Park would provide a range
of opportunities for grounds maintenance work which would allow the Equal
Programme trainees to gain the skills and experience to complete their horticulture
qualifications, while improving the public area too. Furthermore, it is envisaged that a
programme of tree planting and environmental improvements would be developed with
the Park’s Stakeholders including Streetscene, Friends of Lochshore and The
Conservation Volunteers, providing added value for all involved. 
2.13 The location at Lochshore Park would also enable the programme’s bike maintenance
work to be broadened through the linkages to the active travel network and 5km loop
within the Park. Cycling Scotland have recently awarded funding to the Equal
Programme to support their bike maintenance costs and purchase adapted cycles for
people with disabilities. The use of these could be supported and promoted within the
Park, improving access and complementing the existing offer of the accessible
Lochshore Park Hub building, including the Changing Places facilities and recently
completed play facilities. This also creates opportunities to deliver initiatives which will
contribute positively to addressing the current transport barriers. 279

Page 280

2.14 The café facility within Lochshore Park Hub could also offer further opportunities to train
and develop people with skills for a career in hospitality which is a growth sector, where
demand exist across Ayrshire for these skills. The café is currently operated by
Facilities Management, the aspiration is to test the market with a Prior Information
Notice (PIN) to identify an operator and develop a partnership agreement to deliver a
unique partnership to provide on site catering and training/employment opportunities. 
2.15  The proposal has been informed by significant engagement with staff and the existing
180 service users. This has highlighted significantly more opportunities from the
proposed relocation than challenges. The transport requirements of participants have
been carefully considered in the development of this proposal, taking account of the
transport challenges of the rural location. This noted that there are challenges with
transport frequency, however appointments and training sessions could be arranged at
times to suit the transport provision. Meetings have been undertaken with key
stakeholders. These have all been positive in identifying many opportunities to work in
partnership with existing groups at Lochshore, as well as local employers, to maximise
opportunities. An Integrated Impact Assessment was also carried out which identified
that there are opportunities to work closely with the large and small employers in the
Garnock Valley to increase the number of local jobs for local people. 
2.16 Travel expenses are paid for individuals to attend appointments and training, with some
individuals already in receipt of free or subsidised disability travel passes. Supporting
increased independent travel would also develop confidence in programme participants
and travel solutions and can often be a key action within an individual’s employability
action plan. The travel would support individuals to increase their labour market mobility
and encourage widening access around travel to work. The location at Lochshore
would also provide opportunities to work in partnership with local organisations to
explore wider community transport solutions across the Garnock Valley 
2.17 The creation of a Disability Employment Hub at Lochshore Park would complement the
existing offer, support increased footfall, provide daily activities for trainees and deliver
an accredited training facility in the Garnock Valley, supporting trainees from across
North Ayrshire. It would increase the Employability team’s capacity to work with
business to support recruitment and training and to collaborate with local employers to
improve job outcomes for people with disabilities. 
3. Proposals 
3.1 That Cabinet approves the proposal to create a Disability Employment Hub at
Lochshore Park to deliver opportunities which will improve outcomes and contribute to
reducing the disability employment gap. 
4. Implications/Socio-economic Duty
Financial
4.1 The costs associated with the proposal will be met by the employability and skills
funding outlined at Section 2.2.  This would be scaled appropriately should the funding
position change. The proposal also presents an opportunity to explore external funding
and increasing resources by maximising the development opportunities available at
Lochshore Park. 
Human Resources 
280

Page 281

4.2 The affected staff and existing trainees have been consulted throughout the
development of this proposal and are supportive of the proposed approach. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 At the heart of the council’s employability approach and services are issues of
equality, with a focus on providing support to those most excluded from economic
activity. The proposal would deliver additional opportunities to support people to
develop skills and progress to employment, located in an area with socio economic
challenges. An Integrated Impact Assessment has been completed using the appropriate
Toolkit to consider all aspects of Equality Impact Assessment, the Fairer Scotland Duty,
Children’s Rights, Island Communities Impact, the Consumer Duty and crosscutting impacts. 
Climate Change and Carbon 
4.5 The Sustainable North Ayrshire Strategy has a vision of a sustainable, climate ready
North Ayrshire that drives area-wide reductions in carbon emissions in a way which
tackles inequality, promotes fair work, supports Community Wealth Building and
contributes to achieving a wellbeing economy. This proposal aligns with this vision
providing additional resources while tackling inequalities and enhancing opportunities
for people with disabilities to prepare and progress to sustainable employment. A
programme of tree planting would offer training opportunities with carbon reduction
outcomes. 
Key Priorities 
4.6 The proposal would contribute to the Council’s Wellbeing priority and strategic aim to
transition to a wellbeing economy, delivering prosperity, wellbeing and resilience for
local people. It would contribute to the key activities of developing a community wealth
building approach to a wellbeing economy by supporting pathways to employment for
residents, promoting a fair work economy, using our assets to support wellbeing in
local communities and ensure our places and spaces where we live, work and visit are
well maintained and accessible. It would also contribute to the Communities and Local
Democracy and Climate Change priorities and key activities through the development
of relationships with communities and partners and the delivery of environmental
improvements and woodland creation. 
Community Wealth Building 
4.7 Tackling unemployment directly contributes to the pillar of Fair Employment by
focusing support on those residents who have the most barriers to securing Fair
Employment. Lochshore Park is a flagship project in demonstrating the Council’s
Community Wealth Building ambitions and the desire to develop an inclusive and
green economy with wellbeing and climate change principles central to its
development. It plays a key role in supporting economic recovery and renewal,
including through the creation of new jobs. The proposal will further enhance these
activities, building on the Land and Assets pillar by ensuring that the potential of the
site is further realised. 
5. Consultation 
5.1 In accordance with the Scottish Approach to Service Design, service users have been
281

Page 282

consulted, supported and empowered to actively participate in the definition, design,
and delivery of the proposal and therefore their public services. A full Integrated Impact
Assessment has been undertaken with service users and internal stakeholders.
Engagement has also been undertaken with the wider stakeholders of Lochshore Park
and have all been positive in identifying several opportunities to work in partnership
with existing groups at Lochshore, as well as local employers, to maximise
opportunities. 
RUSSELL McCUTCHEON
Executive Director (Place) 