Democracy Spraffa

Integration Joint Board Financial Position

North Ayrshire Council · 3 December 2024
Back to Cabinet — 3 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

NORTH AYRSHIRE COUNCIL 
3 December 2024 
Cabinet 
Title:    Integration Joint Board Financial Position 
Purpose:  To provide Cabinet with an update on the financial position
of the IJB. 
Recommendation:  That Cabinet notes the financial position of the IJB and the
action being taken to manage the overspend position. 
1. Executive Summary 
1.1   The IJB faces a significant financial challenge and is currently projecting a year-
end overspend position of £5.611m (as at Month 6). 
1.2 A financial recovery plan has been developed in line with the requirements of the
Integration Scheme and full delivery of this would improve the position to an
overspend of £2.905m (£2.462m Social Care and £0.443m Health). 
1.3 There remain further financial risks to the IJB driven by factors including in-year
reductions in funding and significant demand pressures on services.  The
financial challenges also have implication for the delivery of the Council’s social
work duties. 
2. Background 
2023/24 Final Outturn Position 
2.1 The North Ayrshire IJB reported a year-end overspend position of £7.464m
(2.4%) for financial year 2023/24. The overspend did not have a financial impact
on either North Ayrshire Council or NHS Ayrshire and Arran, as the IJB held
sufficient unearmarked financial reserves to absorb the full overspend. However,
this left the unearmarked reserve standing at only £0.357m moving into 2024/25. 
2.2 The main areas of pressure were residential placements for children, care at
home, use of supplementary staff across community wards, and unplanned
activities (UNPACS) within the lead partnership for mental health. These
underlying areas of overspend are recurring costs and therefore continued into
2024/25. 
2024/25 Revenue Budget

Page 2

2.3 The IJB, like the Council, is required to set a balanced budget and met in March
2024 to formally agree the budget for 2024/25. Additional cost pressures of
£16.131m were identified and, with only additional funding of £5.841m for specific
Scottish Government priorities, savings of £10.290m were approved by the IJB
to achieve balance. Both the Council and the Health Board provided a flat cash
settlement.  The majority of the savings which were approved as part of the
2024/25 budget are on track to be delivered. 
2.4 The graphs in Appendix A illustrate the main spending areas of the IJB budget
for 2024/25. 
2024/25 Projected Outturn 
2.5 The finance team within the Health and Social Care Partnership carry out regular
budget monitoring in conjunction with Heads of Service and their Senior
Management Teams, and update reports are provided to the IJB on 6 occasions
during each financial year. 
2.6 The most recent report was based on information at Month 6 (September) for
social care expenditure and Month 4 information for health expenditure, and this
was presented to the IJB in November. The report noted a projected overspend
of £5.611m for the current financial year (Month 4 £6.697m overspend). 
2.7 Where a projected overspend is identified, the IJB is required to agree a financial
recovery plan. Initial actions were agreed by the IJB in June based on the
2023/24 outturn position, and further work has continued to develop the recovery
plan with additional actions agreed by the IJB. The full financial recovery plan is
part of the IJB financial report, which is attached at Appendix B. Full achievement
of the actions identified so far would reduce the projected overspend to £2.905m
(Month 4 £2.995m overspend). 
2.8 The cost reduction targets include: 
• A reduction in children’s residential placements
• A reduction in the number of older people’s care home placements
• Delaying approval of new care packages for adults 
• Reduced capacity in the Care at Home service
• Less usage of supplementary staff in community wards
• Additional vacancy turnover targets 
The recovery plan also reflects the use of the remaining unearmarked reserve
balance and a review of earmarked reserves which has released some funding
to support the in-year position. 
2.9 The IJB has not approved a Financial Recovery Plan which meets the full
projected overspend and there remains a significant risk of a year-end actual
overspend position.  It is challenging to identify short term opportunities to
improve the financial position against the performance expectations for services,
the increase in demand for social care supports across all client groups, the

Page 3

inflationary impact on the cost of care including pay and the majority of the
delegated budget being committed to front line care delivery, either through staff
costs or commissioned providers.  The IJB has limited discretionary spend areas
and limited scope to generate income or stop services.  These challenges are
alongside a significant number of financially high-risk areas including continued
uncertainty over funding, through late notification and in-year changes to Scottish
Government funding. 
2.10 The IJB agreed to the establishment of a Finance Working Group (FWG),
consisting of IJB members and senior officers, and chaired by the IJB Vice Chair.
This meets monthly with the main remit being: 
• Detailed scrutiny of in-year financial projections
• Monitoring the delivery of the financial recovery plan
• Monitoring the progress with delivery of the Transformation Plan
• Reviewing the 3-year Medium-Term Financial Outlook
• Detailed scrutiny of budget planning for the next financial year. 
The FWG is not a decision-making group and all decisions in relation to the
budget which require formal agreement will continue to be made by the IJB. 
2.11 The first 3 meetings have already taken place. The group has focussed on the
most significant areas of cost pressure and has so far undertaken deep dives
into the recovery plans in the following service areas: 
• Financial Risks
• Care at Home
• Brighter Pathways (Children’s Residential Placements)
• Older People’s Residential Care Services
• Financial Inclusion
• Charging income and opportunities 
2.12 Further meetings are scheduled to the end of the year and will include follow-up
work on some of the areas above, as well as further areas identified: 
• Medium Term Financial Outlook
• Complex Care including out of area placements
• Addictions Prescribing
• Supplementary Staffing 
2.13 Building on the work of the Finance Working Group, proposals are being
developed for agreement by the IJB, in advance of the budget setting in March,
which will generate future recurring savings. Examples include Financial
Inclusion services and the setting of fees and charges. 
2.14 Other management actions which have been implemented include: 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new

Page 4

governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze has been implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working. 
2.15 Any remaining overspend will have a financial impact on the Council and NHS
Ayrshire and Arran. The Integration Scheme sets out at paragraph 8.2.1 that: 
“The Chief Officer will deliver the Outcomes within the total delegated resources
(paid and Set Aside) and where there is a forecast overspend against an element
of the operational budget, the Chief Officer, the Chief Finance Officer of the
Integration Joint Board and the appropriate finance officers of the Parties must
agree a recovery plan to balance the overspending budget, which recovery plan
shall be subject to the approval of the Integration Joint Board. If the recovery plan
is not successful the Parties will consider making interim funds available based
on the agreed percentage contribution for joint responsibilities, as outlined above,
with repayment in future years on the basis of a revised recovery plan agreed by
the Parties and Integration Joint Board. If the revised plan cannot be agreed by
the Parties or is not approved by the Integration Joint Board, the dispute
resolution mechanism in clause 14 hereof, will be followed.” 
2.16 There are a number of ongoing risks to the financial position of the IJB; these
include but are not limited to: 
• The recent announcements by Scottish Government in relation to public sector
finances and in-year spending reductions will impact on current and future
funding.
• Uncertainty around the level of funding for 2024-25 pay awards, which have
very recently been settled for local government and NHS.
• The significant financial challenge within NHS Ayrshire and Arran and an
expectation that IJBs will support this through the transfer of risk around
primary care prescribing overspends and by contributing to the cost of delayed
discharges from the acute hospitals.
• Continued growing demand for services
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement.
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages, where any additional packages happen on an unplanned basis and
would have a significant financial cost.
2.17 Integration Joint Boards across the country are reporting similar financial
challenges, with many having exhausted their unearmarked reserves during
2023/24, and the majority having financial recovery plans in place for 2024/25 to

Page 5

address a projected overspend position. This situation is driven by the well-
documented increases in demand for health and social care services, the high
levels of cost inflation in recent years and a lack of investment in additional
capacity over a number of years. 
2025-26 and beyond 
2.18 Work is underway in relation to the development of the 2025/26 budget, which
will be agreed by IJB in March 2025, and to refresh the 3-year Medium-term
Financial Outlook for the period 2025-2028. 
2.19 The most recent MTFO, which was reported to IJB earlier in 2024, noted that
there is likely to be a significant budget shortfall which will required to be
addressed in each financial year: 
2.20 The IJB has agreed a Transformation Plan which will contribute to meeting the
financial deficit. This is attached at Appendix C for information. 
Social Work Duties 
2.21 The Chief Social Work Officer presented a report to the IJB in November to
outline the context around Social Work Duties, Available Resource and Ethical
Considerations.   Social Work encompasses a diverse range of services. In
Scotland, local authority Social Work departments or Health and Social Care
Partnerships deliver these services with the aim of supporting some of the most
vulnerable people in society and improving the quality of their lives. Most Social
Work and social care resources are directed towards adult services, mostly on
care services for older people (65 years+). Social Work services also provide
services to children and young people to help support and protect vulnerable
children and their families. Criminal justice Social Work involves a range of
services to the criminal justice system. In North Ayrshire all social work services
are delivered via the Health and Social Care Partnership. 
2.22 The cross-cutting nature of Social Work means that it is regulated by a complex
and constantly evolving statutory framework. The 1968 Social Work (Scotland)
Act recognises the central role of the local authority in determining where there
is a need for the provision of community care services and how such need should
be met. The legislation, as amended in 1990, describes assessment as a two-
stage process: first the assessment of needs and then, having regard to the
results of that assessment, the local authority shall decide whether the needs of
that person call for the provision of services, services can only be provided where
the resources are available to do so.

Page 6

2.23 The use of eligibility criteria applies to the second part of the assessment
process. National eligibility criteria for social care were agreed by the Scottish
Government and COSLA in 2009 and the criteria were explicitly designed to
apply consistently across all adult care groups. NAHSCP has a locally agreed
eligibility criteria that it uses, set by the IJB which defines service access at the
substantial or critical level only. These are defined as follows: 
• Critical Risk: Indicates that there are major risks to an individual’s
independent living or health and well-being and likely to call for the immediate
or imminent provision of social care services.
• Substantial Risk: Indicates that there are significant risks to an individual’s
independence or health and wellbeing and likely to call for the immediate or
imminent provision of social care services. 
2.24 Since the adoption of substantial and critical assessed need as the threshold for
accessing services in North Ayrshire there have been a number of significant
changes in relation to the operating context and the financial context along with
the emergence of a more progressive approach to service design and delivery
based around people and place. 
2.25 There has been considerable demographic change with an ageing local
population, greater numbers of people living with multiple long-term conditions,
increasing numbers of children with an identified disability along with an
increased complexity of need across all age groups. This is further exacerbated
by the broader societal impact of austerity, Covid and the broader effects of
poverty which has compounded the range of difficulties society is facing. 
2.26 Alongside this social context available resources have also become more
constrained with demand far outstripping both financial and human capacity.
Managing infinite human need within finite resources has always been part and
parcel of balancing Social Work demand and capacity. Financial settlements
have resulted in significant pressures on budgets, both as a result of the changes
noted above and inflationary pressures and has resulted in residents waiting for
access to services. 
2.27 Projected figures show no signs of the health and social care system being in a
place to resource itself to meet society’s needs, and within the North Ayrshire
context it is not impossible to imagine a time in the near future, where like others,
we find ourselves in a position where we will not be able to meet our statutory
duties. 
Accounts Commission report 
2.28 A recently published Accounts Commission report, ‘Integration Joint Boards
Finance and Performance’, provides a useful summary of the position. It notes
the highly challenging landscape faced by IJBs in delivering community health
and social care services, including increasing demand for support, insufficient
funding, recruitment and retention challenges across the workforce and the
uncertainty caused by the plans for a National Care Service. Although the report

Page 7

presents the national position, most of the challenges highlighted clearly reflect
the position in North Ayrshire and the key points are noted in the following
paragraphs. 
2.29 The report notes that Integration Joint Boards (IJBs) face a complex landscape
of unprecedented pressures, challenges and uncertainties. These are not easy
to resolve and are worsening, despite a driven and committed workforce. The
health inequality gap is widening, there is an increased demand for services and
a growing level of unmet and more complex needs. There is also variability in
how much choice and control people who use services feel they have, deepening
challenges in sustaining the workforce, alongside increasing funding pressures. 
2.30 The Accounts Commission report that there isn’t significant evidence of the shift
in the balance of care from hospitals to the community intended by the creation
of IJBs. IJBs operate within complex governance systems that can make
planning and decision making difficult. They cannot address the issues across
the sector alone. Whole system collaborative working is needed as part of a clear
national strategy for health and social care that will promote improved outcomes
across Scotland but reflects the need to respond to local priorities. 
2.31 The workforce is under immense pressure reflecting the wider pressures in the
health and social care system. Across the community health and social care
sector there are difficulties in recruiting and retaining a skilled workforce. The
Covid-19 pandemic, the cost-of-living crisis, and the impact of the withdrawal
from the European Union have deepened existing pressures. Unpaid carers are
increasingly relied on as part of the system but are also disproportionately
affected by the increased cost-of-living. Without significant changes in how
services are provided and organised, these issues will get worse as demand
continues to increase and the workforce pool continues to contract. 
2.32 Uncertainty around the direction of the plans for a National Care Service and
continued instability of leadership in IJBs across the country have also
contributed to the difficult context for planning and delivering effective services.
There are many examples of IJBs trying to work in new and different ways, but
there is a lack of collaboration and systematic shared learning on improvement
activities. 
2.33 The financial outlook for IJBs continues to weaken with indications of more
challenging times ahead: 
• In common with other public sector bodies, financial pressures arising from
rising inflation, pay uplifts and Covid-19 legacy costs are making it difficult to
sustain services at their current level and, collaborative, preventative and person-
centred working is shrinking at a time when it is most needed. 
• The financial outlook makes it more important than ever that the budget process
involves clear and open conversations with IJB partners, workforce, people who
use services and other stakeholders around the difficult choices required to
achieve financial sustainability.

Page 8

• Overall funding to IJBs in 2022/23 decreased by nine per cent in real terms or
by one per cent in real terms once Covid-19 funding is excluded. The total
reserves held by IJBs almost halved in 2022/23, largely due to the use and return
of Covid-related reserves. The majority of IJBs reported notable savings, but
these were largely arising on a non-recurring basis from unfilled vacancies. 
• IJBs have had to achieve savings as part of their partner funding allocations for
several years. The projected funding gap for 2023/24 has almost tripled, in
comparison to the previous year, with over a third anticipated to be bridged by
non-recurring savings, with a quarter of the gap bridged using reserves. This is
not a sustainable approach to balancing budgets. 
3. Proposals 
3.1    It is proposed that Cabinet notes the financial position of the IJB, the work being
undertaken to improve the in-year position and the ongoing risks. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There is a financial risk to the Council if the IJB remains in an overspend position
at the end of the financial year. 
Human Resources 
4.2 None. 
Legal 
4.3 The preparation of a Financial Recovery Plan by the IJB complies with the
requirements of the Integration Scheme. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 None. 
Community Wealth Building 
4.7 None.

Page 9

5. Consultation 
5.1  No consultation has been required in the preparation of this report. 
Caroline Cameron
Director (Health and Social Care) 
For further information please contact Caroline Cameron, Director (Health and
Social Care), on carolinecameron@north-ayrshire.gov.uk. 
Background Papers 
None.

Page 10

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (1)

Page 11

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (2)

Page 12

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (3)

Page 13

NORTH AYRSHIRE
Health & Social Care Partnership
#NAHSCPIJB budget (4)

Page 14

Integration Joint Board
14th November 2024
Subject : 2024-25 – Month 6 Financial Performance 
Purpose : To provide an overview of the IJB’s financial performance as at
Month 6 (September). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2024-25 and the current overall projected year-
end overspend of £5.611m, reduced to £2.905m through already
identified financial recovery actions;
(b) notes the progress with delivery of agreed savings;
(c) approves the actions which are being taken to progress
financial recovery and that a further recovery plan will be
presented to the next IJB;
(d) notes the remaining financial risks for 2024-25; and
(e) approves the budget reductions which are detailed at
paragraph 2.10 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
MDT Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework
MDT Multi-Disciplinary Team

Page 15

1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of September further work is undertaken following
the month end to finalise projections, therefore the projected outturn position is as
current and up to date as can practicably be reported. 
It should also be highlighted that the NHS Ayrshire and Arran finance department
have not been able to provide updated financial projections for month 6 and the
position for Health delivered services reflects the month 4 position.  There is a risk
therefore of movement in the projections from Health for month 7, noting that with
restrictions on spend in place this may be a welcomed favourable movement. 
1.2  The projected outturn is a year-end overspend of £5.611m (1.7%) for 2024-25,
reduced to £2.905m through already identified financial recovery actions.    There is
an increasing risk to achieving financial balance during 2024-25, the projected
outturn position is summarised below with the residual risk following already
identified financial improvement actions: 
Split 
TOTAL Health/
NHS AA
Social
Care/NAC
Projected Overspend @ mth6 £5.611m £0.812m £4.799m
Less Financial Recovery Plan Projections £2.706m £0.369m £2.337m
Residual Risk £2.905m £0.443m £2.462m 
1.3  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
1.4 The main movements in the overall projected position and recovery plan are
summarised below: 
Improvement:
• Payroll turnover – social care £1.336m
• Care at home £0.562m
• LD care packages £0.126m
• Integrated Island Services £0.214m 
Deterioration:
• Children’s residential places (inflationary increases) £0.486m

Page 16

• Care Home places (inc interim places) £0.513m (including £0.156m in relation
to the increase in the National Care Home Contract rate for the Agenda for
Change pay award). 
1.5 The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds.  NHS Ayrshire and Arran and North Ayrshire Council are not in a financial
position to make interim funds readily available, therefore it is imperative that the IJB
continues to support the process of development of the Financial Recovery Plan and
the actions required to work towards financial balance by the year-end. 
1.6 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The overspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism.  There is a requirement for the 3 IJBs to be
aware of the position for Lead Partnership services and plans to deliver services from
within allocated budget, on that basis further information will be brought forward with
further detail on Lead Partnership services. 
1.7 The 2024/25 financial position is being adversely impacted by several factors outwith
the control of the IJB. 
• Formal confirmation by The Scottish Government of the 2024/25 funding for
the Mental Health Outcome bundle saw a 3.5% reduction from 2023/24 which
equates to £0.350m and the service are currently working through the
implications of this reduction. It is expected that this can be managed within
the carry forward reserves from 2023/24 so there is no impact on 2024/25 but
the service is exploring the implications of bringing spend within budget in
2025/26. 
• Children’s residential placement contract inflation – Scotland Excel negotiate
rates for several national framework contracts and the rates agreed to date
are significantly higher than the 5.94% increase assumed as part of the
Scottish Living Wage increase. Rates which are agreed to date are included
in the projection and those still to be agreed are assumed to have an increase
based on the average of rates agreed to date.  Overall, the estimated impact
is an increase to the projection of £0.486m. 
Local Government Pay Award Shortfall – the additional cost of the 2024/25
local government pay award is estimated to be £0.900m.  It is unknown at this
stage of this will be fully funded and the potential cost is not included in the
month 6 projected outturn.

Page 17

2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 6 
At month 6 against the full-year budget of £321.135m there is a projected year-end
overspend of £5.611m (1.7%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £4.799m in social care services and a projected
overspend of £0.812m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
Appendix F provides information on the costs of bank and agency staff as requested
at the August IJB. 
2.3 Health and Community Care Services 
Against the full-year budget of £89.939m there is a projected overspend of £6.143m
(6.8%) (£0.094m adverse movement) and the main variances are: 
a) Care home placements - the budgeted number of permanent placements was
765 and at month 6 there were 793 placements. The projected overspend is
£1.072m (£0.458m adverse) on permanent placements (including £0.156m in
relation to increased NCHC rates to reflect the recently agreed nursing pay
award), £0.208m (£0.208m adverse) on interim placements and respite
placements are projected to be online (no change). The plan to manage down the
number of permanent placements to reach the target is challenging due to the
need to minimise delayed discharge from hospital and to continue to support
those in critical and substantial need in the community. 
Income recovered from charging orders is projected to be £0.703m over
recovered (£0.153m favourable movement). This income is challenging to predict
as it depends on the length of the legal process and time taken to sell the property
that the charging order is registered to.

Page 18

b) Care at home is projected to be £2.672m overspent (£0.582m favourable
movement). The position reflects the cost of meeting the significant demand and
level of provision for care at home support.  The favourable movement is due to
the impact of the care at home recovery plan including the holding of vacancies
and improved sickness absence rates.  Earlier in the financial year it was more
difficult to accurately project the cost of the in-house service due to the phased
move of services in-house, more recent months provide a settled financial
baseline from which more accurate projections can be estimated, providing
greater confidence in the projected outturn position. 
c) Physical Disability Services – projected overspend of £0.790m (£0.108m
adverse) split as follows: £1.116m over in residential placements, £0.050m over
in direct payments and £0.376m under in community care packages. 
d) Integrated Island Services is projected to overspend by £0.539m (£0.214m
favourable movement).  The most significant variance is a projected overspend
at Montrose House of £0.422m (£0.136m favourable movement) which relates to
the net overspend on agency staff (i.e. net of underspend on employee costs). A
new contract to procure agency nursing staff commences in November which will
reduce the hourly costs moving forward and this is reflected in the projection. 
e) Specialist Rehab wards – projected overspend of £0.126m (no movement)
(Redburn ward £0.152m overspend and Douglas Grant £0.026m underspend). 
The overspend is due to cover costs for vacancies as well as supplementary
staffing for patients who require one to one support. 
f) Wards 1 and 2 – Projected overspend of £0.762m (no movement) due to use of
supplementary staffing. 
2.4 Mental Health Services 
Against the full-year budget of £107.398m there is a projected overspend of £0.968m
(0.9%) (favourable movement of £0.101m) prior to the re-allocation of the Lead
Partnership variance to East and South HSCP.  The main variances are: 
• Learning Disabilities are projected to overspend by £0.788m (£0.126m
favourable movement) across community care packages, direct payments
and residential placements.  This improvement reflects the positive impact of
assertive reviews of care packages. 
• Community Mental Health services are projected to underspend by £0.380m
(£0.031m favourable) across community care packages, direct payments and
residential placements. The main reason for underspend is the availability and
capacity of adult community providers to deliver new packages of care.

Page 19

• There is a projected underspend of £0.106m (no movement) in relation to the
cost of Hospital Based Complex Continuing Care (HBCCC), this reflects the
impact of change in provision for these services. 
• The Lead Partnership for Mental Health is projected to be £0.658m overspent
(no movement) and the main variances are as follows:
• Adult Inpatients – overspent by £0.442m due to overspends in
supplementary staff for enhanced observations (1:1 and 2:1) and use
of bank staff. 
• The UNPACS (Unplanned Activities) budget – projected overspend is
£0.679m based on current placements and an allowance for one further
placement. The actual cost of the future placements may be different
from the estimated cost assumed in the projection.  These placements
are for individuals with very specific needs that require a higher level of
security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women,
people with a learning disability or people with neurodevelopmental
disorder. This can necessitate an UNPACs placement with a specialist
provider which can be out-of-area.  The nature of mental health
UNPACs spend is that it is almost exclusively on medium or long term
complex secure residential placements which are very expensive so a
small change in placements can have a high budgetary impact. Due to
the complexity and risk involved, transitions between units or levels of
security can take many months. Applications to approve a placement
are made to the Associate Medical Director for Mental Health who
needs to be satisfied that the placement is appropriate and unavoidable
prior to this being agreed. A new group has been established to review
the UnPACS budget and placements with a wider service
representation. 
• Learning Disability Services – projected to underspend by £0.538m.
This position is after recharging other areas on a cost basis for two
outwith authority placements which have incurred additional costs in
relation to usage of supplementary staffing due to sustained enhanced
observations. There is a risk in relation to recovering this income as the
two areas receiving the charges are currently refusing to pay and legal
advice is being sought. 
• Elderly Inpatients – projected overspend of £0.415m due to the use of
supplementary staffing.  The elderly mental health wards continue to
operate at full occupancy and at times with waiting lists, with several
patients who are on enhanced observations and bank costs remain
high.

Page 20

• MH Pharmacy – is projected to overspend by £0.585m due to
increased demand and cost of medicines. 
▪ Innovation Fund – projected underspend of £0.112m due to slippage
within some of the projects and not all of the funding has been
allocated. 
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £0.819m in
2024-25.  Further information is included in the table below: 
Vacancy Savings Target (£1.116m)
Projected to March 2025 £1.935m
Over/(Under) Achievement £0.819m
2.5 Children and Justice Services 
Against the full-year budget of £43.839m there is a projected overspend of £1.688m
(3.85%) (£0.554m adverse movement) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£2.051m (£0.682m adverse movement). The main areas within this are noted
below: 
• Following budget investment of £4m the children’s residential placements are
overspent by £1.898m (£0.359m adverse movement) based on 31
placements at month 6. This demonstrates a reduction of 6 places since the
start of the financial year. There are a number of factors leading to this
challenging position: 
• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking
Children (UASC) under the National Transfer Scheme and to support
trafficked young people who have been identified in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases
is shared 50/50 with Education services.

Page 21

• Contractual inflation has increased the projected costs of residential
places by £0.339m which is outwith the control of the service. 
Children’s Services are continuing to work with other services including Education
and Housing to address the challenges through the work of the ‘Brighter Pathways’
Programme Board and associated workstreams. This forms part of the
Transformation Plan which was approved at the March IJB and an update on this
programme of work is included separately on the agenda. 
.
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.761m underspent (£0.033m adverse movement). 
• Children with disabilities – there is a net projected overspend of £0.582m
(£0.326m adverse movement) across residential placements, direct
payments and community packages. The adverse movement is largely linked
to inflation (£0.147m) and increased package costs (£0.101m) where
estimated costs were used in previous periods. 
• Residential respite – placements are overspent by £0.135m (£0.077m
adverse movement). These short-term placements are used to prevent an
admission to full time care or to avoid placement breakdown. 
• Employee costs – are projected to overspend by £0.172m (adverse
movement of £0.044m), largely due to staffing levels in the children’s houses. 
b) Head of Service – is projected to underspend by £0.675m (£0.151m favourable
movement). This consists of a projected overspend due to the planned saving of
£0.233m in relation to the staff reconfiguration in the children’s houses which was
not achieved in 23-24 and this is offset by the grant funding in relation to
Unaccompanied Asylum-Seeking Children, which is projected to amount to
£0.964m (£0.145m favourable movement) and which contributes to costs incurred
across a number of C&F service areas.   
c) C&F Health Team – is projected to overspend by £0.246m (no movement) mainly
in relation to the Band 6 to 7 regrade for Health Visitors and the progression of
posts up the Band 7 scale. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
This is projected to be on-line.

Page 22

2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £2.787m
(£1.494m favourable) and the main areas of underspend are: 
• There is projected slippage on the LD and MH transition funding of £0.786m
(£0.186m favourable) due to delays in children transitioning into adult services
and actual costs being less than estimated.  This involves complex planning
by services with service users and families and can change over time based
on assessed need when moving into adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   The net impact is neutral, but Appendix A shows this position
for each element.
• An over-recovery of payroll turnover of £1.836m (£1.336m favourable) for
social care services and an over-recovery of payroll turnover of £0.296m (no
movement) for health services as outlined in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (3.301m) (1.522m)
Projected to be achieved by
March 2025
5.137m 1.818m
Over/(Under) Achievement 1.836m 0.296m 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. This has led to a significant increase in the level of turnover
when projected to the year end.  The Health element of vacancy savings will be
updated in month 7. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed separately within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2024-25 budget included £10.290m of savings. 
BRAG Status Position at
Budget Approval
Position at
Month 6

Page 23

£m £m
Red - 0.111
Amber 0.523 0.475
Green 9.767 -
Blue - 9.704
TOTAL 10.290 10.290   
b) The main area to note is that the red savings have increased since month 4
as the saving in relation to Montrose House looks unlikely to be achieved. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount (£000)
1 ICT Budget transfers (5)
2 Transfer to FM services re cleaning post at West Road (10) 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis. 
The outturn in relation to North Lead Partnership services is not fully attributed to the
North IJB as a share is allocated to East and South Partnerships; similarly, the impact
of the outturn on East and South led services is shared with North. At Month 6 the
MH lead partnership is projected to overspend by £0.658m (£0.215m NRAC share
for East and £0.188m for South). 
South HSCP – projected overspend of £0.581m of which £0.215m will be allocated
to North. The variance is mainly due to an overspend of £0.512m in the community
store.  This includes the costs of replacing mattresses, repairs and maintenance

Page 24

contract and equipment costs. There is also a projected overspend of £0.074m in the
continence service and an underspend £0.006m in the Family Nurse Partnership 
East HSCP - projected underspend of £0.360m in total (of which £0.133m will be
allocated to North). The main variances are: 
Allied Health Professions (Lead Partnership)
There is a projected underspend of £0.302m (£0.431m at month 4) on AHP services
hosted by East Ayrshire for the current year, which mainly relates to staffing savings
in Physiotherapy / MSK and Podiatry services and is partially offset by increased
Orthotics costs. 
Primary Care and Out of Hours Services (Lead Partnership)
There is a small projected underspend of £0.064m (£0.023m projected overspend at
month 4) on the Primary Care Lead Partnership budget, with additional costs in Out
of Hours services £0.321m (£0.371m at month 4), with work ongoing to mitigate
increased costs as far as possible over the course of the 2024/25 financial year and
going forward, as well as additional Primary Care contracting and support costs
£0.027m (£0.024m at month 4). These additional costs are offset by a projected
underspend in Dental services totalling £0.344m (£0.219m at month 4), where
staffing numbers are running at less than establishment. Recruitment over the
remainder of the financial year has the potential to impact further on the projected
outturn position at month 6. In addition, there is a small saving on Primary Medical
Services costs £0.058m (£0.152m at month 4). 
Prison and Police Healthcare (Lead Partnership)
The £0.101m (£0.043m at month 4) projected underspend at month 6 is largely due
reduced staffing costs. 
Other Services (Lead Partnership)
The £0.106m (£0.243m at month 4) projected overspend is due to increased Area
Wide Evening Services costs, mainly due to additional staffing costs including high
use of bank staff, which will require to be further addressed going forward. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.  
1.          Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how this compares to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive.

Page 25

The 2023/24 usage is now available as is Q1 of 2024/25 and these has
been presented to Ayrshire Finance Leads for validation. The HSCPs require to
agree their final share of the baseline with each other, however the aggregate will
remain unchanged.  
IJB
Baseline at
2022/23
prices (£)
East 26,215,888
North 35,007,962
South 28,371,789
Total 89,595,639 
The annual budget for Acute Services is £435.0m.  The directorate overspent by
£16.8m after 6 months. This was caused by overspends on agency medical and
nursing staff, together with drug expenditure including the New Medicines Fund,
equipment and supplies. These have been required due to the level of operational
pressure being experienced, in common with many other areas in Scotland.
164 additional unfunded beds remained open across both main hospital sites during
September. 
There is a material underlying deficit caused by:  
• Unachieved efficiency savings
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and
Arran acute hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. Initial work has commenced to develop a joint strategic
commissioning plan for the provision of unscheduled care services, which will outline
these services will be delivered over the medium-term using the set aside resources
available. This will support a shift in the balance of care into the community and
support a reduction in the number of acute beds. 
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position. 
• The recent announcements by Scottish Government in relation to public
sector finances and in-year spending reductions will impact on current and

Page 26

future funding, including for 2024-25 pay awards, which have recently been
settled for local government and NHS but the funding position is not yet clear.
• Continued growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The provider market and the ongoing ability to source packages of care for
service users.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• The ongoing review of the Integration Scheme.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• The wider system financial challenges, especially the financial position of
NHS Ayrshire and Arran Health Board, their financial deficit and the risks
around further escalation in the national framework for financial escalation. 
North Ayrshire IJB have already discussed our position in relation to the
request for payment for delayed discharges last financial year.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The IJB free general fund reserves are estimated to be fully used during this
financial year, leading to an increased risk of requiring additional in-year
financial contributions from NHS Ayrshire and Arran and North Ayrshire
Council to break even. 
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The use of supplementary staffing for enhanced observations across a
number of service areas.
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. Non-
recurring funding has been provided to meet costs associated with this but it
is unclear whether this will be sufficient.
• Scot Excel inflationary increases for children’s service are significantly higher
than assumed. 
These risks will continue to be monitored during 2024-25.

Page 27

2.13 RESERVES 
The IJB reserves position is summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2024 0.357  3.379 1.774 5.510
Anticipated Drawdown (0.357)  (3.379) (1.202) (4.938)
Balance – 31 March 2025 -  - 0.572 0.572 
The £1.774m HSCP earmarked reserve relates to the Service Redesign and Change
Fund; of this total only £0.096m currently remains uncommitted with the balance
being committed to investment in an early intervention approach within Children and
Families social work and supporting the delivery of the transformation programme
across 2024-25 and 2025-26. 
Further detail on the reserves is given in Appendix D. 
2.14 Financial Recovery Plan 
The IJB set a balanced budget for 2024/25 on 14th March 2024. This did not require
any draw on reserves but did include the approval of £10.290m of savings to achieve
financial balance. 
Following the finalisation of the 2023/24 outturn position, the IJB agreed some initial
recovery actions at the meeting in June. In line with the requirements of the
integration scheme, work has continued to develop the financial recovery plan and
identify further targets for financial improvements. The current plan is outlined in full
at Appendix E. 
There has been progress towards some of the targets, and these are already
reflected in the current projected outturn of £5.611m overspend. Further work is
required to deliver on the balance of these targets as well as the additional targets
which have now been identified. 
Services will work towards implementing the recovery plan to deliver on these cost
reduction targets while carefully managing the level of risk. This will include the
preparation of equality impact assessments. 
It is recognised that there needs to be further savings identified to move towards a
breakeven position. Any decisions to implement changes which have significant
impact on service delivery and the wider system will be discussed at the Finance

Page 28

Working Group before being brought back to the IJB for further approval as part of
the financial recovery plan. 
MANAGEMENT ACTIONS/CONTROLS: 
Other management actions which have been implemented include: 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working.
• Ongoing review of future year savings or transformation programmes to
identify scope for acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund
(ILF) Scotland. 
GOVERNANCE: 
• In order to facilitate greater scrutiny of the financial position and the delivery
of the financial recovery plan during 2024/25, the IJB agreed at the June
meeting to establish a ‘Finance Working Group’, chaired by the IJB Vice Chair.
The Director and Heads of Service will be members of the group. This will
meet monthly to facilitate increased oversight and scrutiny of the financial
position and transformation programme as well as detailed budget planning
for future financial years. Meetings have now been scheduled to the end of
the year.  
To date the Finance Working Group has met three times and covered care at
home, care homes, charging income, financial inclusion, an overview of the
budget and the Brighter Pathways project. The next meeting will review
Complex Care, Addictions Prescribing and an update to the Medium-Term
Financial Outlook. 
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams, including
line by line reviews of all budget areas.  Review and enhancement of
frequency and level of financial information provided to support oversight and
decision making in line with financial constraints, with an added focus on areas

Page 29

of underspend to maximise opportunities to delay or stop spend and contribute
to the overall financial challenge. 
INTEGRATION SCHEME 
The Integration Scheme describes the required approach where there is a projected
overspend: 
The Chief Officer will deliver the Outcomes within the total delegated resources (paid
and Set Aside) and where there is a forecast overspend against an element of the
operational budget, the Chief Officer, the Chief Finance Officer of the Integration
Joint Board and the appropriate finance officers of the Parties must agree a recovery
plan to balance the overspending budget, which recovery plan shall be subject to the
approval of the Integration Joint Board. If the recovery plan is not successful the
Parties will consider making interim funds available based on the agreed percentage 
contribution for joint responsibilities, as outlined above, with repayment in future
years on the basis of a revised recovery plan agreed by the Parties and Integration
Joint Board. 
There is an increasing risk to achieving financial balance during 2024-25, the
projected outturn position is summarised below with the residual risk following
already identified financial improvement actions and illustrates the current estimated
risk exposure to the IJBs funding partners: 
Split 
TOTAL Health/NHS
AA
Social
Care/NAC
Projected Overspend @ mth6 £5.611m £0.812m £4.799m
Less Financial Recovery Plan Projections £2.706m £0.369m £2.337m
Residual Risk £2.905m £0.443m £2.462m 
3.  PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2024-25 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2024-
25.

Page 30

4. IMPLICATIONS  
4.1 Financial
The outturn is an overall year-end overspend of £5.611m (1.7%). The report outlines
the main variances for individual services.  There IJBs unearmarked reserve balance
is projected to be zero by the end of the financial year and there is an ongoing risk in
relation to the £2.905m of the overspend where financial recovery improvement
actions require to be identified.  This current position poses a financial risk to North
Ayrshire Council and NHS Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
The ‘financial viability of the HSCP’ risk on our strategic risk register has increased
the risk score to reflect the 23/24 outturn and current projected 24/25 overspend. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2024-25 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout
2024-25. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION 
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team.

Page 31

5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director 
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]-

Page 32

PUBLIC INFORMATION
2024-25 Budget Monitoring Report–Objective Summary as at 30th September 2024                                                                 Appendix A       
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 71,123 76,174 5,051 18,816 19,908 1,092 89,939 96,082 6,143 6,049 94
: Locality Services 30,440 31,937 1,497 5,366 5,410 44 35,806 37,347 1,541 879 662
: Community Care Service Delivery 36,664 39,469 2,805 0 36,664 39,469 2,805 3,476 (671)
: Rehabilitation and Reablement 2,063 2,390 327 0 2,063 2,390 327 17 310
: Long Term Conditions 917 934 17 9,459 10,373 914 10,376 11,307 931 924 7
: Community Link Workers 338 338 0 0 0 0 338 338 0 0 0
: Integrated Island Services 701 1,106 405 3,991 4,125 134 4,692 5,231 539 753 (214)
MENTAL HEALTH SERVICES 34,206 34,624 418 73,192 73,742 550 107,398 108,366 968 1,069 (101)
: Learning Disabilities 25,694 26,482 788 556 555 (1) 26,250 27,037 787 916 (129)
: Community Mental Health 6,485 6,105 (380) 1,739 1,738 (1) 8,224 7,843 (381) (411) 30
: Addictions 2,027 2,037 10 1,899 1,899 0 3,926 3,936 10 12 (2)
: HBCCC 0 0 0 353 247 (106) 353 247 (106) (106) 0
: Lead Partnership Mental Health NHS Area Wide 0 0 0 68,645 69,303 658 68,645 69,303 658 658 0
CHILDREN & JUSTICE SERVICES 38,924 40,366 1,442 4,915 5,161 246 43,839 45,527 1,688 1,134 554
: Irvine, Kilwinning and Three Towns 3,021 3,075 54 0 0 0 3,021 3,075 54 32 22
: Garnock Valley, North Coast and Arran 3,123 3,154 31 0 0 0 3,123 3,154 31 43 (12)
:Intervention Services 1,700 1,704 4 0 0 0 1,700 1,704 4 (1) 5
: Care Experienced Children & Young people 27,131 29,182 2,051 0 0 0 27,131 29,182 2,051 1,369 682
: Head of Service - Children & Families 1,064 389 (675) 0 0 0 1,064 389 (675) (524) (151)
: Justice Services 2,472 2,472 0 0 0 0 2,472 2,472 0 0 0
: C&F Health Team 413 390 (23) 4,203 4,449 246 4,616 4,839 223 215 8
: Lead Partnership NHS Children's Services 0 0 0 712 712 0 712 712 0 0 0
CHIEF SOCIAL WORK OFFICER 1,559 1,558 (1) 0 0 0 1,559 1,558 (1) 12 (13)
PRIMARY CARE 0 0 0 53,109 53,109 0 53,109 53,109 0 0 0
ALLIED HEALTH PROFESSIONALS 0 10,306 10,306 0 10,306 10,306 0 0 0
MANAGEMENT AND SUPPORT COSTS 9,608 7,576 (2,032) 4,407 3,652 (755) 14,015 11,228 (2,787) (1,293) (1,494)
FINANCIAL INCLUSION 970 891 (79) 0 0 0 970 891 (79) 2 (81)
OUTTURN ON A MANAGED BASIS 156,390 161,189 4,799 164,745 165,878 1,133 321,135 327,067 5,932 6,973 (1,041)
Over/
(Under)
Spend
Variance at
Period 4
Movement in  
variance
from Period
4
TOTAL
Partnership Budget - Objective Summary
Council Health
2024/25 Budget

Page 33

PUBLIC INFORMATION 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Return Hosted Over/Underspends East 0 0 0 0 (215) (215) 0 (215) (215) (215) 0
Return Hosted Over/Underspends South 0 0 0 0 (188) (188) 0 (188) (188) (188) 0
Receive Hosted Over/Underspends South 0 0 0 0 215 215 0 215 215 204 11
Receive Hosted Over/Underspends East 0 0 0 0 (133) (133) 0 (133) (133) (77) (56)
OUTTURN ON AN IJB BASIS 156,390 161,189 4,799 164,745 165,557 812 321,135 326,746 5,611 6,697 (1,086)
Over/
(Under)
Spend
Variance at
Period 4
Movement in  
variance
from Period
4
Partnership Budget - Objective Summary
2024/25 Budget
Council Health TOTAL

Page 34

PUBLIC INFORMATION
2024-25 Savings Tracker          Appendix B 
Social Care:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 6
2024/25
Saving
Description of the Saving
Children, Families & Criminal Justice
Service redesign Amber Blue 0.123 Restructure areas of specialist service provision including
substance use and corporate parenting, embedding the roles and
functions of those teams within our locality-based early intervention
approaches and strategic planning including engagement.
Community Care & Health
Review of Day Care provision Amber Blue 0.100 Carry out a review and streamline day care provision.
Sensory Impairment Team Green Blue 0.062 Remove the dedicated management post and realign the team into
core social work teams.
Care Home places Green Amber 0.375 Reduce the number of funded care home places by 15, leaving
budgetary provision for 765 places at average cost.
Charging for community alarm provision
to sheltered housing tenants
Amber Blue 0.200 Introduce a charge for community alarm provision in council
sheltered housing units to ensure an equitable approach across all
housing tenures.
Montrose House capacity Green Red 0.111 Restrict the capacity at Montrose House care home to the current
level of residency.
Voluntary Early Release Green Blue 0.174 Recurring savings achieved by the release of back-office staff
through the council's voluntary early release scheme.
Carers Strategy funding Green Blue 0.384 Utilise the remaining Carer's Strategy funding to invest in respite
provision and short breaks for carers and to support existing
investments in services which support unpaid carers.
Increase to charging Green Blue 0.131 Increase charges for non-residential care by 10% and charges for
residential care by 5%
Remove vacant posts Green Blue 0.280 Remove a number of vacant posts across support services.
Employers' superannuation contributions Green Blue 7.238 Align the budget to the new employer superannuation contribution
rates from 1st April 2024.
Payroll Turnover Green Blue 0.077 Increase targets for payroll turnover through the recruitment
process.
TOTAL SOCIAL CARE SAVINGS 9.255
North Ayrshire Health and Social Care Partnership
2024/25 Savings
Support Services and Partnership-wide savings

Page 35

PUBLIC INFORMATION 
Health:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 6
2024/25
Saving
Description of the Saving
Hospital Based Complex Continuing
Care (HBCCC) provision
Green Blue 0.500 Align the budget to the level of ongoing need for HBCCC provision.
Increase recharge to East Ayrshire for
beds at Woodland View
Green Blue 0.021 Apply an inflationary increase to the recharge to East Ayrshire
HSCP.
Community Recovery and Rehab
provision
Amber Amber 0.100 Review and streamline a range of current provisions to remove
duplication.
Enhanced ICT Green Blue 0.100 Carry out a review of the service delivery model and release
recurring staffing savings.
Payroll Turnover Green Blue 0.314 Increase targets for payroll turnover through the recruitment
process.
TOTAL HEALTH SAVINGS 1.035
TOTAL NORTH HSCP SAVINGS 10.290

Page 36

PUBLIC INFORMATION
2024-25 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     156.190
Adjustments to baseline     (0.574)
Less Resource Transfer 23/24     (24.640)
Revised Budget     130.976
Resource Transfer 24/25 1-3 P 24.861
Realign Girfec Team To Connected
Communities 1-3 P (0.073)
ICT Budget Transfers 1-3 P (0.006)
CJSW Funding 2425 1-3 T 0.053
Children’s Living Wage Allocation 1-3 T 0.525
ICT Budget Transfers 6 P (0.002)
ICT Budget Transfers 6 P (0.003)
Post Realigned from the Policy, Performance &
Elections Team 6 P 0.059
Transfer to FM Services re Cleaning Services
at West Road 6 P (0.010)
Roundings 1-3   0.010
Social Care Budget Reported at Month 6 156.390
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Budget exc set aside     157.894
Add Resource Transfer 23/24     24.640
Month 10-12 Adjustments and adjusting for the
full year impact of part years amounts and
temporary funding.    
(0.033)
Revised Budget   P 182.501
Add resource Transfer 24/25     (24.861)
North Superannuation 24/25 uplift 1   1.134
MH: Anticipate Hollybush Combat Stress 24/25 1   1.424
MH: Anticipate Delivery of Veteran Funding 24/25 1   0.105
MH: Anticipate Perinatal MH, Infant MH (inc MNPI)
24/25 1   0.750
Training grade ADJ – April 1   0.063
Pecos Nurse Post  1   (0.018)
Script Switch To Pharmacy 1   (0.002)
Breastfeeding Pay Award – South 2   0.005

Page 37

PUBLIC INFORMATION
Nest – South 2   0.066
24-25 Foxgrove North 2   0.033
24-25 Breast Feeding – North 2   0.005
24-25 Huntingtons North 2   0.005
24-25 NEST North 2   0.066
Phlebotomy Admin Returned 2   0.005
23-24 - 50% North Share to East - Tier 3 Weight
Management 2   (0.077)
24-25 North Share to East - Tier 3 Weight
Management 2   (0.022)
Anticipate ADP Afc Pay Uplift 3   0.091
Anticipate ADP Drug Prevalence 3   0.084
Anticipate ADP Lived & Living Exp 3   0.013
Anticipate ADP Mat 3   0.250
Anticipate ADP National Mission 3   0.296
Anticipate ADP Residential Rehab 3   0.134
Anticipate ADP Whole Family Approach 3   0.094
Training Grade Adj – Jun 3   (0.054)
Prescribing (Ambush) North Rx 3   1.573
Prescribing (Ambush) North Rx Cres 3   (1.477)
24-25 North Budget Paper - Office 365 (to East) 3   (0.073)
24-25 North Budget Paper - Prison Pharm Contract
(to East) 3   (0.093)
South Mat Funding – Psychiatrist 3   0.029
Hd198: Early Intervention In Psychosis/ Body
Image And Social Media Resource 3   0.242
Hd203: Digital Mental Health Programme Licence
& Support 3   0.005
Reduction to the Working Week (mth 2 - 4)  4  0.105
Post to medical records 4  (0.037)
HD107: breast Feeding project funds 4  0.056
BBV 4  0.280
Anticipated budgets assumed in the report but not
yet allocated  4   2.045
Health Budget Reported at Month 6 164.745
TOTAL COMBINED BUDGET      321.135

Page 38

PUBLIC INFORMATION
24-25 IJB Reserves Position      Appendix D 
Area of Reserves
Balance at
31 March
2024
2024-25
Anticipated
Draw Downs
Projected
Balance at
31 March
2025
: Alcohol & Drug Partnership 641 (641) 0
: Mental Health Action 15 57 (57) 0
: Service Redesign / Challenge Fund 1,774 (1,202) 572
: Community Living Change Fund 377 (377) 0
: Family Wellbeing Fund 1,313 (1,313) 0
: Wellbeing Fund 50 (50) 0
: Breast Feeding Network 26 (26) 0
: MH Recovery and Renewal 546 (546) 0
: Buvidal 23 (23) 0
: Brooksby 5 (5) 0
: Cossette Funding 4 (4) 0
: Expansion of Primary Care Estates 55 (55) 0
: GP Premises Improvements - tranches 1 and
2 63 (63) 0
: Mental Health Wellbeing in Primary Care 81 (81) 0
: Dental Practice Improvement 29 (29) 0
:Appropriate Adult Scheme 2 (2) 0
:Adult Tier 3 Weight Management Service 19 (19) 0
: Phlebotomy 22 (22) 0
: LD Health Checks 66 (66) 0
Total Earmarked 5,153 (4,581) 572
Unallocated General Fund 357 (357) 0
General Fund 5,510 (4,938) 572
Earmarked Funds

Page 39

PUBLIC INFORMATION
Financial Recovery Action Plan          Appendix E 
FINANCIAL RECOVERY PLAN £m £m £m
Projected Overspend at Month 6 5.611
SERVICE AREA
Cost
reduction
target
Achieved in
projected
outturn
Still to be
achieved Target set?
Health and Community Care
Reduce care home placements in line with
budget saving (0.700) 0.000 (0.700) June IJB
Reduce CAH capacity/delay recruitment/in-
house efficiencies (0.850) (0.582) (0.268) June IJB
Community Wards - reduce supplementary
staffing and review bed capacity (0.500) (0.247) (0.253) June IJB
MH and LD (North Ayrshire)
Freeze adult community support approvals
outwith transitions 0.000 0.000 0.000 June IJB
Respite provision - ensure use of in-house
capacity is maximised 0.000 0.000 0.000 June IJB
HBCCC mitigation plan (0.106) (0.106) 0.000 August IJB
MH and LD (Lead Partnership)
Ward staffing (adults/elderly inpatients) (0.300) 0.000 (0.300) August IJB
Psychiatry (use of agency) (0.312) (0.312) 0.000 August IJB
CEDS/CAMHS (0.202) (0.202) 0.000 August IJB
North Ayrshire share (38.6%) (0.314) (0.198) (0.116)
Children and Families
Reduce children's external placements - early
reduction from Brighter Pathways work (0.500) (0.500) 0.000 June IJB
Additional target re-residential placements (0.500) (0.229) (0.271) August IJB
Additional target re-residential placements (0.225) 0.000 (0.225) September IJB
Reduce investment in C&F social work via
service redesign fund (0.300) 0.000 (0.300) September IJB
Cross Partnership
Vacancy management and temporary posts (0.500) (0.500) 0.000 June IJB
Use of remaining reserve balance (0.357) 0.000 (0.357) August IJB
Review of earmarked reserves (0.216) 0.000 (0.216) September IJB
Target Achieved Outstanding
(5.068) (2.362) (2.706)
Remaining projected overspend 2.905

Page 40

PUBLIC INFORMATION
Bank and Agency Costs to Month 6      Appendix F 
Bank and Agency Costs
1) NHS
4863
(Registered)
4864
(Unregistered)
4853
(Registered)
4854
(Unregistered) TOTAL
AAC074 NORTH CORE SLT ADULT 8,393 8,393
AAC403 WARD 1 WOODLANDS VIEW 34,920 225,803 260,722
AAC406 WARD 2 WOODLANDS VIEW 26,513 155,470 181,983
AAC410 ACH REDBURN REHAB WARD NRS 4,978 61,525 66,503
AAC412 ACH DOUGLAS GRANT REHAB WD NRS 8,280 36,613 44,893
AAD401 WARD 3 WOODLANDS VIEW NURSING 24,023 183,094 1,589 709 209,415
AAD402 WARD 4 WOODLANDS VIEW NURSING 27,339 154,288 185 181,812
AAH047 NEW CLONBEITH NURSING(JURA) 70,510 52,118 122,628
AAH415 WVIEW THE GLEN ECT 1,797 1,797
AAH417 WVIEW WARD 10 ACUTE MH NRS 30,213 42,330 72,543
AAH423 WVIEW WARD 8 ACUTE MH NRS 18,861 431,987 251 451,100
AAH460 WARD 5 WOODLANDS VIEW 13,856 17,339 31,195
AAH466 WVIEW WARD 7B REHAB MH NRS 2,103 2,103
AAH492 NEW DUNURE NURSING(CLONBEITH) 29,391 83,451 112,842
AAT001 TRINDLEMOSS 38,661 87,076 125,737
AAW047 ARRAN HOSPITAL NURSING 16,496 21,877 13,091 51,465
ACA405 CAMHS MANAGEMENT 1,943 1,943
ACN004 PACKAGE OF CARE (P) - CY 15,313 15,313
ACN012 PACKAGE OF CARE (P) - AMG 36,067 36,067
ACN013 PACKAGE OF CARE (P) - LMO 4,884 4,884
ACP002 NC POC TEAM 2 259 259
ACP003 NC POC TEAM 3 1,199 1,199
ACA412 CAMHS UNSCHEDULED CARE 3,287 3,287
ACF002 EARLY YRS-C/F TEAM 2 290 290
ACF051 IMMUNISATION NURSING 11,321 7,237 18,558
ACN000 ARRAN HV 316 316
ACN047 ARRAN DN 235 235
ADN000 THREE TOWNS DN 7,927 161 8,088
ADN033 IRVINE DN 13,138 13,138
ADN042 NORTH WEST COAST DN 4,037 99 4,136
ADN075 GARNOCK VALLEY DN 58,839 58,839
ADN080 NORTH DN TEAM LEADERS 4,286 4,286
ALA047 LADY MARGARET NURSING 9,159 4,116 13,275
AMA408 PREVENTION + SERVICES SPT TEAM 1,481 1,481
AML146 LD HEALTH CHECKS 73,240 73,240
AML392 NORTH CLDT 429 429
AML402 LDS MANAGEMENT 4,190 4,190
AML442 NORTH PARTNERSHIP ADMIN MH 13 13
AML500 MHS INPATIENT MGT 16,335 16,335
AMN412 CMHT NURSING-NORTH AYRSHIRE 8,054 8,054
AMN415 WVIEW WARD 7C FORENSIC REHAB N 5,340 72,642 77,982
AMN419 DAY ACTIVITIES TEAM 227 227
AMN425 INTENSIVE COMMUNITY NURSING TEAM 21,003 21,003
AMN431 ADULT MENTAL HEALTH LIASION TEAM 2,295 2,295
AMN433 PCMHT NORTH 1,663 1,663
AMN446 WVIEW WARD 6 LOW SECURE NRS 37,984 117,628 155,611
AMN454 WARRIX AVE 12,933 19,271 32,204
ANP074 NORTH CORE SLT PAEDS 1,483 1,483
AMN468 ACTION 15 - ADULT LIAISON 5,410 5,410
ANU632 ICFN - COMMUNITY PHLEBOTOMY 6,877 6,877
AWV438 WVIEW WARD 7A LD A+T NRS 11,497 382,852 1,588 5,379 401,316
AXC407 WVIEW WARD 9 ACUTE MH NRS 22,091 101,402 123,494
AXC418 WVIEW WARD 11 ACUTE MH NRS 46,675 155,589 257 202,521
TOTAL 723,286 2,498,562 16,442 6,782 3,245,072
2) SOCIAL CARE Month 6
Agency Cost
Montrose House 498,029       
Acm - Irvine 1,188          
Mh Acm 54,708        
Ld Acm 15,852        
TOTAL 569,777       
Bank Agency

Page 41

No embedded text on this page.

Page 42

No embedded text on this page.

Page 43

No embedded text on this page.

Page 44

No embedded text on this page.

Page 45

No embedded text on this page.

Page 46

No embedded text on this page.

Page 47

No embedded text on this page.