NORTH AYRSHIRE COUNCIL 
29 October 2024 
Cabinet 
Title:    Revenue Budget 2024/25: Financial Performance to 31
August 2024 
Purpose:  To advise Cabinet of the financial performance for the Council
at 31 August 2024. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; and
(b) note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.5. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2024/25 were approved by Council on
28 February 2024. The Housing Revenue Account (HRA) Revenue Budget for
2024/25 was approved by Council on 14 February 2024. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the second report for 2024/25 and covers the period to the end of
August 2024 (Period 5). Projections have been made to the year-end. 
1.3  At Period 5 the General Fund is forecasting a net in-year overspend of £1.257m,
(0.3%), after transferring resources to/from earmarked reserves. This is an
improvement of (£0.752m) from that reported at Period 3. 
1.4  The Housing Revenue Account is forecasting a net breakeven position. This is a
£0.266m reduction from the previously reported underspend. 
1.5  The Health and Social Care Partnership is projecting a year-end overspend of
£6.697m, (2.1%), for 2024/25. The Council services element is reporting a projected
overspend of £5.840m and the Health services element is reporting a projected
overspend of £0.857m. However, previously identified financial recovery actions have
reduced the projected overspend to £2.995m, £2.507m for Council Services, which is
an improvement of (£0.431m) from the previously reported overspend, and £0.488m
for Health services, which is a £0.283m increase to the previously reported
overspend.

Page 2

1.6 Significant risks to the reported position have been identified in relation to the reported
HSCP position which requires measures to be put in place by the HSCP to address
these risks. However, this position may have an impact on the level of financial
contributions from the funding parties. This presents a material risk to the financial
sustainability of the Council. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2024/25. In addition to the budget approved
on 28 February 2024, earmarked funds of £84.940m were carried forward from
2023/24 for service expenditure in 2024/25 and beyond. These funds are reflected in
the figures within the 2024/25 financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year overspend of £1.257m, (0.3%),
net of transfers to/from reserves, is anticipated for the year to 31 March 2025. The
forecast position will continue to be monitored throughout the year. However, any final
overspend will require the utilisation of Council reserves and may negatively impact
on future budget gaps in the medium term. 
2.3 Details of the current financial projections are summarised in the following table: 
Service Expenditure
App
No.
Annual
Budget
£ million
Projection
to 31 March
2025
£ million
Projected
Variance
for year
(Fav)/Adv
£ million
Projected
Variance
at P3 
(Fav)/Adv 
£ million Movement Note 
Corporate Services 1 18.558 18.436 (0.122) (0.052) (0.070)  
Education 2 173.932 176.753 2.821 3.003 (0.182) (i)
Place 3 52.721 53.582 0.861 0.956 (0.095) (ii)
Communities &
Housing 4 13.870 13.870 0.000 0.047 (0.047)  
Other Corporate Items 5 30.003 27.964 (2.039) (1.664) (0.375) (iii)
Sub Total   289.084 290.605 1.521 2.290 (0.769)  
Health and Social
Care Partnership 9 131.470 131.470 0.000 0.000 0.000  
Balance for Services   420.554 422.075 1.521 2.290 (0.769)  
Financing Charges 6 15.692 15.692 0.000 0.000 0.000  
Contribution to Loans
Fund Reserve 6 7.010 7.010 0.000 0.000 0.000  
Total Planned
Expenditure   443.256 444.777 1.521 2.290 (0.769)  
Aggregate External
Finance 6 (369.870) (369.870) 0.000 0.000 0.000  
Council Tax 6 (65.681) (65.945) (0.264) (0.281) 0.017  
Use of Earmarked
Funds 6 (7.705) (7.705) 0.000 0.000 0.000  
Total Planned
Income   (443.256) (443.520) (0.264) (0.281) 0.017  
Net Expenditure/
(Income)   0.000 1.257 1.257 2.009 (0.752)

Page 3

2.4 Commentary on Significant Movements from Period 3 
The Council's overall financial forecast against the revised budget is an improvement
of (£0.752m) from the previously reported position. A brief explanation of the
significant movements at service level are outlined as follows: 
(i) Education – overspend of £2.821m, an improvement of (£0.182m) from the
previously reported overspend 
The movements are primarily related to: 
• Further projected underspend in relation to facilities management catering
operations across schools, taking account of uptake projections, food and
staffing costs and funding, (£0.347m). 
This has been partly offset by: 
• Increased employee cost projections related to unachieved turnover across the
service, £0.145m.
(ii) Place – overspend of £0.861m, an improvement of (£0.095m) from the
previously reported overspend 
The movement is primarily related to: 
• Revised timetable for the completion of property remedial works, (£0.100m);
• Utilisation of earmarked reserves within Property Maintenance, (£0.071m); and 
• Vacancy management across services, (£0.062m). 
These have been partly offset by additional costs in relation to waste disposal
contracts and unfunded legislative requirements, £0.163m. 
(iii) Other Corporate Items – underspend of (£2.039m), an improvement of
(£0.375m) from the previously reported underspend 
The movement is primarily related reduced inflationary pressures arising from
utility contracts across all services, (£0.350m). 
Health and Social Care Partnership 
2.5 A copy of the HSCP financial performance report as at the end of July 2024 is
attached at Appendix 9. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised below: 
• The projected outturn is a year-end overspend of £6.697m for 2024/25. However,
this has been reduced to £2.995m due to previously identified financial recovery
actions. This is a reduction of (£0.148m) since the previous reporting period.
• The projected overspend on the Council Services element is £5.969m over the
same period, reduced to £2.938m following the identified financial recovery
actions. This is a reduction of (£0.431m) since the previous reporting period;

Page 4

• The most significant areas of overspend include care at home, residential
placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and unplanned
activities within the lead partnership for mental health.  Further detail is included in
the report at Appendix 9. 
The main areas of risk identified include: 
• The recent announcements by Scottish Government in relation to public sector
finances and in-year spending reductions will impact on current and future funding;
• Continued growing demand for services;
• Staff recruitment and retention challenges across a number of service areas;
• The provider market and the ongoing ability to source packages of care for service
users;
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement;
• Ongoing delivery costs of Scottish Government policy directives, particularly where
these are not fully funded or inflation proofed;
• The ongoing review of the Integration Scheme;
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this;
• The wider system financial challenges, especially the financial position of NHS
Ayrshire and Arran Health Board, their financial deficit and the risks around further
escalation in the national framework for financial escalation.  North Ayrshire IJB
have already discussed our position in relation to the request for payment for
delayed discharges last financial year;
• The underlying levels of overspend which are recurring into 2024-25 and may
impact on the Partnership’s ability to continue to sustain service levels in the future.
• The IJB free general fund reserves are estimated to be fully utilised during this
financial year, leading to an increased risk of requiring additional in-year financial
contributions from NHS Ayrshire and Arran and North Ayrshire Council to break
even; 
• High risk areas of low volume / high-cost services areas e.g. Children’s residential
placements, Learning Disability care packages and complex care packages; 
• Lead / hosted service arrangements, including managing pressures and reporting
this across the 3 IJBs;
• The impact on Lead Partnership and acute services from decisions taken by other
Ayrshire areas;
• The use of supplementary staffing for enhanced observations across a number of
service areas;
• The use of high-cost agency staff to support frontline service delivery in areas where
there are recruitment challenges;
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-grade,
protected learning time and reduction to the working week. Non-recurring funding
has been provided to meet costs associated with this but it is unclear whether this
will be sufficient. 
These risks and progress against the financial recovery plan will continue to be
monitored during 2024-25.

Page 5

Risks 
2.6 Under the terms of the Health and Social Care Integration Scheme, a recovery plan
must be agreed to address the projected overspend. There is a risk that, if the
recovery plan is not successful, this could have an impact on the level of financial
contributions from the funding parties. Although there would be an expectation that
any additional contributions would be repaid, this could have a knock on effect on the
level of reserves available to address future Council budget gaps as provision would
be required for the potential non-recovery of these funds within a reasonable
timeframe. This position presents a material risk to the financial sustainability of the
Council. 
Housing Revenue Account 
2.7  The Housing Revenue Account budgeted for a breakeven position in 2024/25 and is
currently projecting to outturn in line with this. This is a reduction of £0.266m from the
previously reported underspend position. The projected position is summarised in the
following table with further details provided in Appendix 7. 
Housing Revenue
Account Annual
Budget
£
million
Projection
to 31 March
2025
£ million
Projected
Variance
for year
(Fav)/Adv
£ million
Projected
Variance
at P3
(Fav)/Adv 
£ million Movement Note 
Employee Costs 5.118 5.118 0.000 0.000 0.000  
Property Costs 22.694 24.217 1.523 0.840 0.683 (i)
Supplies and Services 2.353 2.351 (0.002) (0.005) 0.003  
Transport and Plant
Costs 0.021 0.021 0.000 0.000 0.000  
Administration Costs 1.756 1.770 0.014 0.006 0.008  
Third Party Payments 3.752 3.801 0.049 0.048 0.001  
Transfer Payments 0.163 0.163 0.000 0.000 0.000  
Other Expenditure 0.490 0.503 0.013 0.013 0.000  
Capital Financing 26.526 24.556 (1.970) (1.811) (0.159) (ii)
Gross Expenditure 62.873 62.500 (0.373) (0.909) 0.536  
Income (62.873) (62.500) 0.373 0.643 (0.270) (iii)
Net Expenditure 0.000 0.000 (0.000) (0.266) 0.266   
2.8 Commentary on Significant Movements from Period 3 
A brief explanation of the significant movements is outlined as follows: 
(i) Property Costs – overspend of £1.523m, an increase of £0.683m from the
previously reported overspend 
The movement reflects increased expenditure across all categories, including
Responsive Repairs reflecting increased costs for timber and damp works,
£0.138m, Void Repairs, £0.261m, Planned and Cyclical Maintenance, £0.147m,
and Other Property Costs £0.138m.

Page 6

(ii) Capital Financing – underspend of (£1.970m), an increase of (£0.159m) from
the previously reported underspend 
The movement reflects the current treasury strategy of delaying external
borrowing through the utilisation of cash balances, combined with adjustments to
profiling within the HRA Capital programme. These funds will be required to
support the HRA capital programme in future years. 
(iii) Income – under recovery of £0.373m, a reduction of (£0.270m) from the
previously reported 
The movement is primarily related to increased income from Recharges,
(£0.257m), and improved Council House rent income, (£0.071m). These have
been partly offset by a reduction in other income, £0.059m. 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a)  note the information and financial projections outlined in the report; and
(b)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.5. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 31 August 2024 is a net overspend of £1.257m.
Further in-year measures will require to be put in place across Directorates to address
this. 
Housing Revenue Account
A net breakeven position is forecast for the year as at 31 August 2024. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None.

Page 7

Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2024/25: Financial Performance to 30 June 2024 – Cabinet 27 August
2024

Page 8

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 137              143              6                      4%
Total for Chief Executive 137              143              6                      4%
Financial Services
Change Programme 109              109              -                      0%
Audit, Fraud, Safety & Insurance 622              599              (23)                  (4%)
Corporate Procurement 893              827              (66)                  (7%) 1         
Financial Services 1,363           1,363           -                      0%
Revenues (616)             (616)             -                      0%
Transformation 669              669              -                      0%
Total for Financial Services 3,040           2,951           (89)                  (3%)
People & ICT
Employee Services 816              816              -                      0%
HR & Organisational Development 1,061           1,073           12                    1%
ICT 4,877           4,877           -                      0%
Business Support 1,064           1,064           -                      0%
Customer Services 3,856           3,856           -                      0%
Total for People & ICT 11,674         11,686         12                    0%
Democratic Services
Legal & Licensing 407              407              -                      0%
Policy, Performance & Elections 542              497              (45)                  (8%)
Communications 447              455              8                      2%
Civil Contingencies 60                60                -                      0%
Committee Services 409              409              -                      0%
Member Services 1,311           1,316           5                      0%
Ayrshire Support Service 479              465              (14)                  (3%)
Information Governance 52                47                (5)                    (10%)
Total for Democratic Services 3,707           3,656           (51)                  (1%)
Totals 18,558         18,436         (122)                (1%)

Page 9

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 15,901         15,784         (117)                (1%)
Property Costs 68                68                -                      0%
Supplies and Services 3,006           3,006           -                      0%
Transport and Plant Costs 22                22                -                      0%
Administration Costs 1,338           1,343           5                      0%
Other Agencies & Bodies 1,937           1,937           -                      0%
Transfer Payments 853              853              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 23,125         23,013         (112)                (0%)
Income (4,567)          (4,577)          (10)                  0%
Net Expenditure 18,558         18,436         (122)                (1%)

Page 10

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement - There has been a favourable movement of £0.018m since P3 due to extended vacancy
management.
925 (66) -7% Employee costs - There is a projected underspend of £0.066m due to vacancy management.
(66)

Page 11

Appendix 2
EDUCATION
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 21,281         21,143            (138)                (1%) 1         
Primary Education 49,839         50,390            551                 1% 2         
Secondary Education 62,869         62,567            (302)                (0%) 3         
Additional Support Needs 14,988         16,389            1,401              9% 4         
Central Education 3,730           6,132              2,402              64% 5         
Pupil Equity Fund 4,367           4,367              -                      0%
Facilities Management 16,751         15,658            (1,093)             (7%) 6         
Net Total 173,932       176,753          2,821              2%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 98,002         100,294          2,292              2%
Employee Costs - Non Teachers 47,191         46,809            (382)                (1%)
Property Costs 1,082           1,151              69                   6%
Supplies and Services 25,125         24,854            (271)                (1%)
Transport and Plant Costs 121              132                 11                   9%
Administration Costs 434              459                 25                   6%
Other Agencies & Bodies 8,687           10,439            1,752              20%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 71                71                   -                      0%
Gross Expenditure 181,293       184,789          3,496              2%
Income (7,361)          (8,036)             (675)               
Net Expenditure 173,932       176,753          2,821              2%

Page 12

Appendix 2a
EDUCATION
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement: There has been a favourable movement of £0.044m compared to P3 due to a projected decrease
in employee costs.
15,919 (138) -1%
Employee Costs : Overall an estimated underspend of £0.138m.
- Teachers:- projected underspend of £0.008m due to absence.
- Non Teachers:- projected underspend of £0.214m as a result of vacancy management offset by a budgeted
turnover target of £0.084m resulting in a net underspend of £0.130m
A reduction to the budget of £1.198m in 23/24 necessitated a drawdown from Education earmarked funds of
£0.507m pending permanent savings to be implemented for 24/25. The Service redesign has been developed
and will be  implemented by August 2024. The position will be further reviewed from August onwards to assess
costs associated with the new model.
(138)
Note 2 Primary Education
Movement: There has been an unfavourable movement of £0.254m compared to P3 due to a projected
unachieved turnover in employee costs.
47,469 551 1%
Employee Costs : Overall an estimated overspend of £0.551m.
- Teachers:- projected overspend of £0.029m together with a budgeted turnover target of £0.493m resulting in
a net overspend of £0.522m
- Non Teachers:- projected underspend of £0.227m offset by a budgeted turnover target of £0.256m resulting
in a net overspend of £0.029m.
551
Note 3 Secondary Education
Movement: There has been an favourable movement of £0.101m compared to P3 due to a projected decrease
in employee costs.
47,176 (340) -1%
Employee Costs : Overall an estimated underspend of £0.340m.
- Teachers:- projected underspend of £0.844m offset by a budgeted turnover target of £0.535m resulting in a
net underspend of £0.310m
- Non Teachers:- projected underspend of £0.217m offset by a budgeted turnover target of £0.187m resulting
in a net underspend of £0.030m
38 Other minor movements
(302)
Note 4 ASN
Movement: There has been a favourable movement of £0.123m compared to P3. This is mainly due to a
£0.143m increase in employee costs underspends. Day placement fees have increased by £0.032m, partly due
to an additional young person accessing day placement provision. This is partly offset with decreased
residential placement fees of £0.005m and a decrease of £0.013m for payments to other local authorities for
children accessing placements in their establishments.
14,988 (230) -2%
Employee Costs : Overall an estimated underspend of £0.230m.
- Teachers:- projected underspend of £0.189m offset by a budgeted turnover target of £0.073m resulting in a
net underspend of £0.116m
- Non Teachers:- projected underspend of £0.278m offset by a budgeted turnover target of £0.165m resulting
in a net underspend of £0.113m
355 (129) -36% There is a projected underspend of £0.129m on payments to Other Local Authorities due to a reduction in the
number of NAC children accessing placements in their establishments.
1,010 453 45%
There is a projected overspend of £0.453m on external day placements as a result of additional children
requiring this level of support and an increase in rates from these establishments.  Currently there are 29
children in, or expected in, day placement provision. A further review of the process for authorising placements
will be carried out by the service.
543 1,427 263%
There is a projected overspend of £1.427m on external specialist residential placements.  Currently there are
16 children in, or expected in, accommodation.  Increased pressures on internal care settings as well as
changing needs of children and young people have resulted in an increase in the need for external residential
settings. Joint working is ongoing with HSCP to ensure that all options are fully explored to ensure that all
options are considered to retain young people within their local community where possible.  Where this is not
possible, a forum has been set up to further discuss those young people who will require care and education
provision to support them appropriately. Any future additional children who enter Residential Accommodation
will increase the future projected overspend.
(264) (120) There is a projected over recovery of £0.120m in Other Local Authorities income due to the number of other
authority children accessing a place in NAC establishments.
1,401

Page 13

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Central Education
Movement: There has been a unfavourable movement of £0.179m compared to P3 mainly due to a projected
increase in teacher cover costs.
2,767 2,203 80%
Employee costs: There is a projected overspend of £2.298m mainly as a result of significant increase in costs
associated with mandatory cover for teacher maternity cover and sickness absence. There are currently 41
Teachers (36.9 FTE) on maternity leave as well as 8 Early Years Practitioners and 4 Classroom Assistants
(11.2 FTE).  Absence levels are subject to regular review across the service and appropriate actions are taken
to maximise attendance. Average days lost per FTE is 3.86 for the period April-August compared to 2.83 days
lost for same period last year. Average days lost last year was 11 related to the whole service compared to an
estimated 13 days for this year. This is offset by projected underspend in Leadership & Music services of
£0.207m
- 302
There is a projected under recovery of teacher induction grant funding linked to a reduction in the number of
probationary teachers allocated to North Ayrshire by the Scottish Government. Core placement allocations
have been reduced from 51 FTE to 34 FTE resulting in a £0.302m reduction in anticipated grant funding.
(1,120) (106) 9% Income: PPP insurance rebate £0.068m and PPP deductions of £0.038m in excess of budget
3 Other minor movements.
2,402
Note 6 Facilities Management
Movement: There has been an favourable movement of £0.347m compared to P3 mainly due to further
projected underspends in relation catering operations across schools, taking account of uptake projections,
food and staffing costs and funding.
13,744 (439) -3% Employee Costs: There is a projected underspend of £0.439m primarily due to recruitment challenges and a
targeted reduction of overtime and casual costs.
942 69 7% Property Costs: There is a projected overspend of £0.069m mainly in washroom supplies
4,639 (312) -7% Supplies and services: There is a projected overspend of £0.087m in food costs.This has been offset by a
projected underspend of £0.400m across supplies and services in relation to school meal uptake.
(2,621) (448) 17% Income: There is a projected over-recovery of cleaning and janitorial income of £0.060m and a projected over-
recovery of school meals income of £0.388m
- 37 Other minor movements
(1,093)
Note 7 General
Management action to scrutinise all recruitment verification processes has now started in an attempt to reduce
the overall overspend across all employee costs.

Page 14

Appendix 3
PLACE
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 184              184               -                      0%
Neighbourhood Services
Roads 6,844           6,844            -                      0%
Streetscene 4,841           4,850            9                     0%
Waste Resources 9,321           9,834            513                 6% 1         
Municipalisation Advertising (123)             (73)                50                   (41%) 2         
Total for Neighbourhood Services 20,883         21,455          572                 3%
Economic Development, Growth and
Investment
Economic Policy 264              264               -                      0%
Employability & Skills 1,795           1,782            (13)                  (1%)
Regeneration 886              886               -                      0%
Business 878              878               -                      0%
Growth & Investment 247              247               -                      0%
Total for Economic Development, Growth and
Investment 4,070           4,057            (13)                  (0%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,412           1,403            (9)                    (1%) 3         
Housing Assets & Investment (1)                 (1)                  -                      0%
Property Maintenance 3,694           3,694            -                      0% 4         
Property Running Costs 4,951           4,971            20                   0% 5         
Energy and Sustainability 7,260           7,260            -                      0%
Internal Transport 10,268         10,559          291                 3% 6         
Total for Sustainability, Transport and Corporate
Property 27,584         27,886          302                 1%
Net Total 52,721         53,582          861                 2%

Page 15

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 27,311         27,621          310                 1%
Property Costs 21,742         21,761          19                   0%
Supplies and Services 4,243           4,271            28                   1%
Transport and Plant Costs 9,404           9,766            362                 4%
Administration Costs 556              560               4                     1%
Other Agencies & Bodies 14,968         15,045          77                   1%
Transfer Payments -                   -                    -                      0%
Other Expenditure 78                67                 (11)                  (14%)
Capital Financing -                   -                    -                     
Gross Expenditure 78,302         79,091          789                 1%
Income (25,581)        (25,509)         72                   (0%)
Net Expenditure 52,721         53,582          861                 2%

Page 16

Appendix 3a
PLACE
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Waste Services
Movement: There has been an unfavourable movement of £0.163m since P3 due to increased costs within
Third Party Payments mostly from the Clyde Valley and Bulky Waste contracts. The increase for the Clyde
Valley contract was caused by an increase in tonnages, this will be monitored throughout the remainder of the
year. In respect of bulky waste, due to an unfunded legislative change Persistent Organic Pollutants (POPs)
materials at Household Waste Recycling Centres have to be separated and disposed of separately, which
results in a significantly higher gate fee/disposal cost. Increases in contamination levels has also been
identified and to counter this the Waste Awareness Team are promoting a Right Stuff Right Bin comms
campaign and also putting new stickers on bins to remind residents what each bin should be used for.
4,916 422 9%
Employee Costs: The overspend includes the temporary additional resources required to address the current
significant and challenging cumulative sickness absence rate of 15.21 days per FTE from April 2024 to August
2024, if this level continues this would result in an annual rate of 36.5 days per year per FTE. In context, the
absence rate for the same period in 2022/23 was 7.5 days per FTE, resulting in 23.64 days per year per FTE,
and in 2023/24 9.01 days per FTE, resulting in 28.64 days per year per FTE. A robust absence monitoring
process is in place and a dedicated resource has been recruited to monitor and review the absence
management process in Waste, through assisting supervisors with absence management meetings, referrals
to occupational health etc and to support employees return to work. The statutory nature of the service requires
additional resources to cover unforeseen absences. Additional costs are incurred as a result of this and
servicing the bins on overtime attracts enhanced rates. To help mitigate against these additional costs,
resources are being deployed from other services to assist in the Monday to Friday collections reducing the
requirement for overtime. Additionally, resources out-with Waste Collections have received HGV training to
help provide cover for collections. Weekly budget meetings are also being held between the Waste Ops
Management Team and Finance.  An overall review of the Waste service in light of legislative changes and
current service demands is ongoing. This will also take account of waste compositional analysis, presentation
rates, tonnages etc.
214 70 33% Transport Costs: Additional vehicles are in place to deal with ongoing pressures and demands.
21 Other minor movements
513
Note 2 Municipalisation Advertising
Movement: There has been no movement from P3.
(123) 50 (41%) Income: An under recovery of £0.050m primarily due to lead in time for vehicle advertising and unfavourable
market conditions.
50
Note 3 Property Management and Investment
Movement:  There has been a favourable movement of £0.062m since P3 primarily due to vacancy
management.
2,433 (62) (3%) Employee Costs: There is a projected underspend of £0.062m due to vacancy management.
40 Income: There is a projected under-recovery of fee income of £0.040m.
13 Other minor movements
(9)
Note 4 Property Maintenance Costs
Movement: There has been a favourable movement of £0.100m since P3 in relation to property remedial works
which are now anticipated to be undertaken during 2025/26.
Note 5 Property Running Costs
Movement: There has been a favourable movement of £0.072m since P3 primarily due to utilising earmarked
reserves to meet the repair obligations across the commercial estate.
20 Other minor movements
20
Note 6 Internal Transport
Movement: There has been a favourable movement of £0.020m since P3.
1,680 42 3% Employee Costs: There is a projected overspend of £0.042m due to unachieved turnover.
4,682 288 6% Transport Provision Costs: There is a projected overspend of £0.288m due to a higher number of pupils
requiring transport and an increase in tendered costs in Private Contracts for the provision.
1,769 (101) (6%) Fuel: There is a projected underspend in fuel of £0.101m due to a decrease in fuel prices.
1,228 50 4% Repairs & Maintenance: There is a projected overspend of £0.050m in repairs and maintenance as a result of
price increases and maximising the life of assets due to replacement vehicle lead times. 
12 Other minor movements
291

Page 17

Appendix 4
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 117              117               -                      0%
Housing and Public Protection
Building Services (2,550)          (2,550)           -                      0% 1         
Property Governance -                   -                    -                     
Planning Services 283              145               (138)                (49%) 2         
Protective Services 1,616           1,616            -                      0%
Other Housing 2,615           2,676            61                   2% 3         
Total for Housing and Public Protection 1,964           1,887            (77)                  (4%)
Connected Communities 11,789         11,866          77                   1% 4         
Net Total 13,870         13,870          -                      0%
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 24,130         24,246          116                 0%
Property Costs 2,979           2,984            5                     0%
Supplies and Services 7,085           7,086            1                     0%
Transport and Plant Costs 974              977               3                     0%
Administration Costs 215              225               10                   5%
Other Agencies & Bodies 11,043         11,044          1                     0%
Transfer Payments -                   -                    -                      0%
Other Expenditure 171              172               1                     1%
Capital Financing -                   -                    -                     
Gross Expenditure 46,597         46,734          137                 0%
Income (32,727)        (32,864)         (137)                0%
Net Expenditure 13,870         13,870          -                      0%

Page 18

Appendix 4a
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since period 3.
5,641 (92) (2%) Supplies & Services: An underspend of £0.092m in supplies and services. This is primarily due to an
underspend in materials as a result of a reduction in void kitchen and bathroom works.
3,194 45 1% Third Party Payments: An overspend in third party payments of which £0.023m relates to agency workers and
£0.022m in subcontractor costs.
884 34 4% Transport: A projected overspend in transport costs due to increased external vehicle hire costs.
13 Other minor movements
-
Note 2 Planning Services
Movement: There has been a favorable movement since period 3 of £0.044m, due to an increase in planning
application fee income
(584) (138) 24% Income: Forecasted over recovery of £0.138m due to additional planning fee application income.
(138)
Note 3 Other Housing
Movement: There has been a favourable movement of £0.004m since period 3.  A £0.021m increase in
Employee costs has been offset by the utilisation of earmarked reserves to meet additional bad debt provision.
3,364 40 1% Employee Costs: Projected overspend due to £0.020m of partially unachieved turnover and a forecasted
overspend of £0.020m in casual staff in relation to Ardrossan Hostel.
21 Other minor movements
61
Note 4 Connected Communities
Movement: There have been no significant movements since period 3.
6,353 77 1% Employee Costs: Overspend of £0.077m is primarily as a result of revised programming of implementation of
the approved saving to reduce library opening hours by 20%.
77

Page 19

Appendix 5
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,331 2,231 (100)             (4%)
SPT Concessionary Fares 286 286 -                   0%
Ayrshire Joint Valuation Board 973 932 (41)               (4%)
3,590 3,449 (141)             (4%) 1           
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
24,219 22,255 (1,964)          (8%) 2           
Housing Benefits (51)               15                66                -129% 3           
30,003 27,964 (2,039)          (7%)

Page 20

Appendix 5a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
There has been no movement from Period 3
3,590 (141)                -4% Projected underspend of (£0.140m) due confirmation of annual requisitions and applicable refunds.
(141)
Note 2 Other Corporate Items
There has been a favourable movement of £0.374m due to a reduction in utility cost inflation provision,
£0.350m, and increased income from employee benefit schemes, £0.024m.
24,219 (1,964)             -8%
The projected underspend is primarily related to centrally held inflationary cost provisions, which are being
applied to offset pressures reported across other services (£0.513m), additional income from employee benefit
schemes (£0.319m)and additional Scottish Government grant income not required in year (£0.758m).
(1,964)
Note 3 Housing Benefit
There has been no movement from Period 3
(51)             66                   -129% Projected overspend of £0.066m due to Housing Benefit Overpayment Recovery
66

Page 21

Appendix 6
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 15,692 15,692 - -
Contribution to Loans Fund Reserve 7,010 7,010 - -
Scottish Government Funding (369,870) (369,870) - -
Council Tax (65,681) (65,945) (264) 0% 1
Use of Earmarked Funds (7,705) (7,705) - -
Net Total (420,554) (420,818) (264) 0%
Growth in the Council Tax base (£0.637m) has been partly offset by an increase in the value of CTR claims
received, £0.274m, and adjustment for prior years, £0.099m. Reported collection rates have shown an initial
improvement and are line with pre pandemic levels.
Note 1 Council Tax
Movement: There has been a minor movement of £0.017m since period 3, primarily related to adjustments to our
Council Tax base, £0.065m, partly offset by a reduction in forecast CTR claims, (£0.073m).

Page 22

Appendix 7
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,118 5,118 - 0%
Property Costs
Responsive Repairs 7,670 8,088 418 5%
Void Repairs 4,192 4,545 353 8%
Planned and Cyclical Maintenance 5,544 6,176 632 11%
Aids and Adaptions 1,617 1,617 - 0%
Other property costs 3,671 3,791 120 3%
Total for Property Costs 22,694 24,217 1,523 7% 1
Supplies & Services 2,353 2,351 (2) (0%)
Transport Costs 21 21 - 0%
Administration Costs 1,756 1,770 14 1%
Third Party Payments 3,752 3,801 49 1%
Transfer Payments 163 163 - 0%
Other Expenditure 490 503 13 3%
Capital Financing Costs 26,526 24,556 (1,970) (7%) 2
Gross Expenditure 62,873 62,500 (373) (1%)
Income
Council House Rents (60,202) (60,216) (14) 0%
Other Rents (473) (67) 406 (86%)
Recharges (1,082) (1,160) (78) 7%
Other Income (1,116) (1,057) 59 (5%)
Total Income (62,873) (62,500) 373 (1%) 3
Net Expenditure - - -

Page 23

Appendix 7a
HRA
BUDGETARY CONTROL 2024/25
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2024
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
22,694 1,523 7%
1,523
Note 2
26,526 (1,970) -7%
(1,970)
Note 3
(62,873) 373 -1%
373
B/fwd from
2023/24
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/25
£m £m £m £m £m £m
11.590 - - - - 11.590
5.000 - - - (1.104) 3.896
2.000 - - - - 2.000
1.553 - - - - 1.553
0.300 - - - - 0.300
0.123 - - - - 0.123
20.566 - - - (1.104) 19.462
HRA reserves and balances
An under recovery in income of £0.373m. This is due to an under recovery of £0.406m in Other Rents and £0.059m
in other income, partially offset by an over recovery of £0.078m in recharges.
Capital Financing Costs
Movement - there has been a favourable movement of £0.159m since Period 3.
A projected underspend of £1.970m in capital financing costs reflects continuing strategy to delay new external
borrowing by utilising cash balances, resulting in savings on external interest costs and changes in the profile of the
capital programme.
Section
Income
Movement - there has been a favourable movement of £0.270m since Period 3. This mainly due to a favourable
movement of £0.071m in Council House Rents and £0.257m in Recharges, partially offset by an adverse
movement of £0.059m in Other Income.
Property Costs
Movement - there has been an adverse movement of £0.683m since Period 3. This is due to an increase of
£0.138m in Responsive Repairs, £0.261m in Void Repairs, £0.147m in Planned and Cyclical Maintenance and
£0.138m in other property costs.
There is a projected overspend of £0.418m in Responsive Repairs due to the volume and scope of the works. A
projected £0.632m overspend in relation to Planned and Cyclical Maintenance, largely due to £0.226m costs in
relation to storm damage works resulting from adverse weather conditions early in 2024 and £0.317m projected
overspend due to increased costs in relation to timber and damp works. A projected overspend of £0.120m in other
property costs, largely relating to an overspend of £0.067m in void rent loss. In addition there are projected
overspends of £0.353m in Void Repairs.
Council House Building Fund
Sustainability Fund
Software licences
Transformation Programme
Tenant led budget
Unearmarked

Page 24

Appendix 8
Integration Joint Board
19th September 2024
Subject : 2024-25 – Month 4 Financial Performance 
Purpose : To provide an overview of the IJB’s financial performance as at
Month 4 (July). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2024-25 and the current overall projected year-
end overspend of £6.697m, reduced to £2.995m through already
identified financial recovery actions;
(b) notes the progress with delivery of agreed savings;
(c) approves the actions which are being taken to progress
financial recovery and that a further recovery plan will be
presented to the next IJB;
(d) notes the Care at Home recovery actions detailed at Appendix
F
(d) notes the remaining financial risks for 2024-25; and
(e) approves the budget reductions which are detailed at
paragraph 2.10 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework

Page 25

1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of July, further work is undertaken following the month
end to finalise projections, therefore the projected outturn position is as current and
up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £6.697m (2.1%) for 2024-25,
reduced to £2.995m through already identified financial recovery actions.    There is
an increasing risk to achieving financial balance during 2024-25, the projected
outturn position is summarised below with the residual risk following already
identified financial improvement actions: 
Split 
TOTAL Health/
NHS AA
Social
Care/NAC
Projected Overspend @ mth4 £6.697m £0.857m £5.840m
Less Financial Recovery Plan Projections £3.702m £0.369m £3.333m
Residual Risk £2.995m £0.488m £2.507m 
1.3  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
1.4 Whilst the overall projected outturn position has not significantly changed, there are
material movements within services, the main movements in the overall projected
position and recovery plan are summarised below: 
Improvement:
• Children’s residential places £0.352m 
Deterioration:
• Care Home places £0.063m
• LD placements £0.320m 
1.5 The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds.  NHS Ayrshire and Arran and North Ayrshire Council are not in a financial
position to make interim funds readily available, therefore it is imperative that the IJB
continues to support the process of development of the Financial Recovery Plan and
the actions required to work towards financial balance by the year-end.

Page 26

1.6 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The underspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism. 
1.7 The Scottish Government have recently announced the 2024/25 funding for the
Mental Health Outcome bundle which estimates a 4.5% reduction from 2023/24. 
Formal confirmation of the funding allocation has not yet been received, but this
would equate to £0.450m and the service are currently working through the
implications of this reduction. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 4 
At month 4 against the full-year budget of £321.083m there is a projected year-end
overspend of £6.697m (2.1%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £5.840m in social care services and a projected
overspend of £0.857m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
Appendix G provides information on the costs of bank and agency staff as requested
at the August IJB. 
2.3 Health and Community Care Services 
Against the full-year budget of £90.116m there is a projected overspend of £6.049m
(6.7%) (£0.062m adverse movement) and the main variances are:

Page 27

a) Care home placements - the budgeted number of permanent placements was
765 and at month 4 there were 789 placements. The projected overspend is
£0.614m (£0.063m adverse) on permanent placements and respite placements
are projected to be online (£0.023m adverse movement). A plan is in place to
manage down the number of permanent placements to reach the target, however
this is challenging due to the need to minimise delayed discharge from hospital
and to continue to support those in critical and substantial need in the community. 
Income recovered from charging orders is projected to be £0.550m over
recovered. This income is challenging to predict as it depends on the length of
the legal process and time taken to sell the property that the charging order is
registered to. 
b) Care at home (now all in house) is projected to be £3.254m overspent (no
movement). The position reflects the cost of meeting the significant demand and
level of provision for care at home support.   
These projections include the estimated cost of bringing the purchased services
inhouse.  The projection is complex due to services being brought in-house at
different times, the number of posts and vacancies transferred, the estimated time
to fill all of the posts and the costs of covering the required hours (plain time
versus overtime) until the posts are filled.  The projection is historically based on
average costs to date but the data for month 1 – 4 is skewed because of the
transfer of the purchased service at different points so this will be reviewed and
refined in month 6 when there will be more representative data. 
c) Physical Disability Services – projected overspend of £0.682m (£0.030m
adverse) split as follows: £1.007m over in residential placements, £0.027m over
in direct payments and £0.352m under in community care packages. 
d) Integrated Island Services is projected to overspend by £0.752m.  The most
significant variance is a projected overspend at Montrose House of £0.561m
which relates to the net overspend on agency staff (i.e. net of underspend on
employee costs). 
e) Specialist Rehab wards – projected overspend of £0.126m (£0.009m favourable)
(Redburn ward £0.152m overspend and Douglas Grant £0.026m underspend). 
The overspend is due to cover costs for vacancies as well as supplementary
staffing for patients who require one to one support. 
f) Wards 1 and 2 – Projected overspend of £0.762m (£0.003m favourable) due to
use of supplementary staffing.
2.4 Mental Health Services 
Against the full-year budget of £107.531m there is a projected overspend of £1.069m
(1%) (adverse movement of £0.478m) prior to the reallocation of the Lead
Partnership variance to East and South HSCP.  The main variances are:

Page 28

• Learning Disabilities are projected to overspend by £0.916m (£0.320m
adverse movement) across community care packages, direct payments and
residential placements. 
• Community Mental Health services are projected to underspend by £0.411m
(£0.011m favourable) which is mainly due to a projected underspend of
£0.541m in community packages and overspends in residential placements of
£0.093m and direct payments of £0.055m. The main reason for underspend
is the availability and capacity of adult community providers to deliver new
packages of care. 
• There is a projected underspend of £0.106m (£0.035m adverse) in relation to
the cost of Hospital Based Complex Continuing Care (HBCCC), this reflects
the impact of change in provision for these services. 
• The Lead Partnership for Mental Health is projected to be £0.658m overspent
(£0.137m adverse movement) and the main variances are as follows: 
• Adult Inpatients – overspent by £0.442m (£0.058m adverse) due to
overspends in supplementary staff for enhanced observations (1:1 and
2:1) and use of bank staff.   
• The UNPACS (Unplanned Activities) budget – projected overspend is
£0.679m (£0.048m favourable movement) based on current
placements and an allowance for one further placement. The actual
cost of the future placements may be different from the estimated cost
assumed in the projection.  These placements are for individuals with
very specific needs that require a higher level of security and/or care
from a staff group with a particular skill set/competence.  There are no
local NHS secure facilities for women, people with a learning disability
or people with neurodevelopmental disorder. This can necessitate an
UNPACs placement with a specialist provider which can be out-of-area. 
The nature of mental health UNPACs spend is that it is almost
exclusively on medium or long term complex secure residential
placements which are very expensive so a small change in placements
can have a high budgetary impact. Due to the complexity and risk
involved, transitions between units or levels of security can take many
months. Applications to approve a placement are made to the
Associate Medical Director for Mental Health who needs to be satisfied
that the placement is appropriate and unavoidable prior to this being
agreed. A new group has been established to review the UnPACS
budget and placements with a wider service representation. 
• Learning Disability Services – projected to underspend by £0.538m
(£0.011m adverse movement). This position is after recharging other
areas on a cost basis for two outwith authority placements which have
incurred additional costs in relation to usage of supplementary staffing
due to sustained enhanced observations. There is a risk in relation to
recovering this income as the two areas receiving the charges are
currently refusing to pay and legal advice is being sought.

Page 29

• Elderly Inpatients – projected overspend of £0.415m (£0.004m
adverse) due to the use of supplementary staffing.  There are several
patients who are on enhanced observations and bank costs remain
high. 
• MH Pharmacy – is projected to overspend by £0.585m (£0.099m
adverse) due to increased demand and cost of medicines. 
▪ Innovation Fund – projected underspend of £0.112m (no change) due
to slippage within some of the projects and not all of the funding has
been allocated. 
▪ Action 15 – projected online as any underspend will be carried forward
for use in 25-26.   
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £0.819m in
2024-25.  Further information is included in the table below: 
Vacancy Savings Target (£1.116m)
Projected to March 2025 £1.935m
Over/(Under) Achievement £0.819m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £44.045m there is a projected overspend of £1.134m
(2.6%) (£0.449m favourable movement) pre earmarking and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£1.369m (£0.352m favourable movement). The main areas within this are noted
below: 
• Following budget investment of £4m the children’s residential placements are
overspent by £1.539m based on 33 placements at month 4 and assumes a
reduction to 32 places by month 6. This demonstrates a reduction of 5 places
since the start of the financial year. There are a number of factors leading to
this challenging position: 
• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking
Children (UASC) under the National Transfer Scheme and to support
trafficked young people who have been identified in North Ayrshire.

Page 30

• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases
is shared 50/50 with Education services. 
Children’s Services are continuing to work with other services including
Education and Housing to address the challenges through the work of the
‘Brighter Pathways’ Programme Board and associated workstreams. This
forms part of the Transformation Plan which was approved at the March IJB. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.728m underspent (£0.027m favourable movement). 
• Children with disabilities – there is a net projected overspend of £0.256m
(£0.132m adverse movement) across residential placements, direct
payments and community packages. 
• Residential respite – placements are overspent by £0.058m. These short-
term placements are used to prevent an admission to full time care or to avoid
placement breakdown. 
• Employee costs – are projected to overspend by £0.216m, largely due to
overspends in the children’s houses. 
b) Head of Service – is projected to underspend by £0.524m (£0.053m favourable
movement). This is made up a projected overspend due to the planned saving of
£0.233m in relation to the staff reconfiguration in the children’s houses which was
not achieved in 23-24 and this is offset by the grant funding in relation to
Unaccompanied Asylum-Seeking Children, which is projected to over-recover by
£0.819m and which covers costs incurred across a number of C&F service areas.   
c) C&F Health Team – is projected to overspend by £0.246m (£0.015m favourable)
mainly in relation to the Band 6 to 7 regrade for Health Visitors and the
progression of posts up the Band 7 scale. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.012m mainly due to a delay in spend in the
Carers Strategy funding. 
2.8 MANAGEMENT AND SUPPORT

Page 31

Management and Support Services are projected to underspend by £1.293m
(£0.068m adverse) and the main areas of underspend are:
• There is projected slippage on the LD and MH transition funding of £0.661m
due to delays in children transitioning into adult services and actual costs
being less than estimated.  This involves complex planning by services with
service users and families and can change over time based on assessed need
when moving into adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   The net impact is neutral, but Appendix A shows this position
for each element.
• An over-recovery of payroll turnover of £0.500m for social care services and
an over-recovery of payroll turnover of £0.296m for health services as outlined
in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (3.301m) (1.522m)
Achieved to March 2025 3.801m 1.818m
Over/(Under) Achievement 0.500m 0.296m 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
The partnership significantly over-achieved on turnover targets last financial year
which helped greatly to support the overall financial position.  The early projections
for 2024-25 indicate a reduction in the turnover being projected, which reflects a more
optimistic position for recruitment and reduced vacancies but clearly has an impact
on the ability to use this to offset overspends in other budget areas. 
As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2024-25 budget included £10.290m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 4
£m
Red - -
Amber 0.523 0.675

Page 32

Green 9.767 0.600
Blue - 9.015
TOTAL 10.290 10.290 
b) The main area to note is that the amber savings have increased as the care
home budget is currently projecting an overspend but this will be managed
into an online position. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount (£000)
1 Post to medical records (37) 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis. 
The outturn in relation to North Lead Partnership services is not fully attributed to the
North IJB as a share is allocated to East and South Partnerships; similarly, the impact
of the outturn on East and South led services is shared with North. At Month 4 the
MH lead partnership is projected to overspend by £0.658m (£0.215m NRAC share
for East and £0.188m for South). 
South HSCP (month 3 info) – projected overspend of £0.551m of which £0.204m will
be allocated to North. The variance is mainly due to an overspend of £0.512m in the
community store.  This includes the costs of replacing mattresses, repairs and
maintenance contract and equipment costs. There is also a projected overspend of
£0.069m in the continence service and an underspend £0.030m in the Family Nurse
Partnership.   
East HSCP - projected underspend of £0.208m (£0.176m favourable movement) in
total (of which £0.077m will be allocated to North). The main variances are: 
Allied Health Professions (Lead Partnership)

Page 33

There is a projected underspend of £0.431m on AHPs services hosted by East
Ayrshire for the current year, which mainly relates to staffing savings in
Physiotherapy / MSK and Podiatry services and is partially offset by increased
Orthotics costs. 
Primary Care and Out of Hours Services (Lead Partnership) 
There is a small projected overspend of £0.023m on the Primary Care Lead
Partnership budget and additional costs in Out of Hours services £0.371m, with work
ongoing to mitigate increased costs as far as possible over the course of the 2024/25
financial year and going forward, as well as additional Primary Care contracting and
support costs £0.024m. These additional costs are largely offset by a projected
underspend in Dental services totalling £0.219m, where staffing numbers are running
at less than establishment. Recruitment over the remainder of the financial year has
the potential to impact further on the projected outturn position at month 4. In addition,
there is a small saving on Primary Medical Services costs £0.152m. 
Prison and Police Healthcare (Lead Partnership) 
The £0.043m projected underspend at month 4 is largely due reduced staffing costs. 
Other Services (Lead Partnership) 
The £0.243m projected overspend is due to increased Area Wide Evening Services
costs, mainly due to additional staffing costs including high use of bank staff, which
will require to be addressed going forward. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources. 
1. Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how this compares to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive. 
The 2023/24 usage is now available as is Q1 of 2024/25 and these will be presented
to Ayrshire Finance Leads for validation. 
IJB
Baseline at
2022/23
prices (£)
East 26,215,888
North 35,007,962

Page 34

South 28,371,789
Total 89,595,639 
The annual budget for Acute Services is £432.3m.  The directorate overspent by
£11.2 million after 4 months. This was caused by overspends on agency medical
and nursing staff, together with drug expenditure including the New Medicines Fund,
equipment and supplies. These have been required due to the level of operational
pressure being experienced, in common with many other areas in Scotland. 156
additional unfunded beds remained open across both main hospital sites during
July.
There is a material underlying deficit caused by: 
• Unachieved efficiency savings
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and
Arran acute hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. Initial work has commenced to develop a joint strategic
commissioning plan for the provision of unscheduled care services, which will
outline these services will be delivered over the medium-term using the set aside
resources available. This will support a shift in the balance of care into the
community and support a reduction in the number of acute beds. 
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position. 
• The recent announcements by Scottish Government in relation to public
sector finances and in-year spending reductions will impact on current and
future funding, including for 2024-25 pay awards, which have not yet been
settled for local government or NHS.
• Continued growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The provider market and the ongoing ability to source packages of care for
service users.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges, for example the joint mission for
delayed discharge improvement.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• The ongoing review of the Integration Scheme.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.

Page 35

• The wider system financial challenges, especially the financial position of
NHS Ayrshire and Arran Health Board, their financial deficit and the risks
around further escalation in the national framework for financial escalation. 
North Ayrshire IJB have already discussed our position in relation to the
request for payment for delayed discharges last financial year.
• The underlying levels of overspend which are recurring into 2024-25 and may
impact on the Partnership’s ability to continue to sustain service levels in the
future.
• The IJB free general fund reserves are estimated to be fully utilised during
this financial year, leading to an increased risk of requiring additional in-year
financial contributions from NHS Ayrshire and Arran and North Ayrshire
Council to break even. 
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The use of supplementary staffing for enhanced observations across a
number of service areas.
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. Non-
recurring funding has been provided to meet costs associated with this but it
is unclear whether this will be sufficient. 
These risks will continue to be monitored during 2024-25. 
2.13 RESERVES 
The IJB reserves position is summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2024 0.357  3.379 1.774 5.510
Anticipated Drawdown (0.357)  (3.379) (1.202) (4.938)
Balance – 31 March 2025 -  - 0.572 0.572 
The £1.774m HSCP earmarked reserve relates to the Service Redesign and Change
Fund; of this total only £0.096m currently remains uncommitted with the balance
being committed to investment in an early intervention approach within Children and
Families social work and supporting the delivery of the transformation programme
across 2024-25 and 2025-26.

Page 36

Further detail on the reserves is given in Appendix D. 
2.14 Financial Recovery Plan 
The IJB set a balanced budget for 2024/25 on 14th March 2024. This did not require
any draw on reserves but did include the approval of £10.290m of savings to achieve
financial balance. 
Following the finalisation of the 2023/24 outturn position, the IJB agreed some initial
recovery actions at the meeting in June. In line with the requirements of the
integration scheme, work has continued to develop the financial recovery plan and
identify further targets for financial improvements. The current plan is outlined in full
at Appendix E. 
There has been progress towards some of the targets, and these are already
reflected in the current projected outturn of £6.697m overspend. Further work is
required to deliver on the balance of these targets as well as the additional targets
which have now been identified. 
Services will work towards implementing the recovery plan to deliver on these cost
reduction targets while carefully managing the level of risk. This will include the
preparation of equality impact assessments. 
It is recognised that there needs to be further savings identified to move towards a
breakeven position. Any decisions to implement changes which have significant
impact on service delivery and the wider system will be discussed at the Finance
Working Group before being brought back to the IJB for further approval as part of
the financial recovery plan. A summary of the Care at Home plan is included at
Appendix F. 
MANAGEMENT ACTIONS/CONTROLS: 
Other management actions which have been implemented include: 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working.
• Ongoing review of future year savings or transformation programmes to
identify scope for acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund
(ILF) Scotland.

Page 37

GOVERNANCE: 
• In order to facilitate greater scrutiny of the financial position and the delivery
of the financial recovery plan during 2024/25, the IJB agreed at the June
meeting to establish a ‘Finance Working Group’, chaired by the IJB Vice Chair.
The Director and Heads of Service will be members of the group. This will
meet monthly to facilitate increased oversight and scrutiny of the financial
position and transformation programme as well as detailed budget planning
for future financial years. Meetings have now been scheduled to the end of
the year and the first meeting took place on 9th September. 
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams, including
line by line reviews of all budget areas.  Review and enhancement of
frequency and level of financial information provided to support oversight and
decision making in line with financial constraints, with an added focus on areas
of underspend to maximise opportunities to delay or stop spend and contribute
to the overall financial challenge. 
INTEGRATION SCHEME 
The Integration Scheme describes the required approach where there is a projected
overspend: 
The Chief Officer will deliver the Outcomes within the total delegated resources (paid
and Set Aside) and where there is a forecast overspend against an element of the
operational budget, the Chief Officer, the Chief Finance Officer of the Integration
Joint Board and the appropriate finance officers of the Parties must agree a recovery
plan to balance the overspending budget, which recovery plan shall be subject to the
approval of the Integration Joint Board. If the recovery plan is not successful the
Parties will consider making interim funds available based on the agreed percentage 
contribution for joint responsibilities, as outlined above, with repayment in future
years on the basis of a revised recovery plan agreed by the Parties and Integration
Joint Board. 
There is an increasing risk to achieving financial balance during 2024-25, the
projected outturn position is summarised below with the residual risk following
already identified financial improvement actions and illustrates the current estimated
risk exposure to the IJBs funding partners: 
Split 
TOTAL Health/NHS
AA
Social
Care/NAC
Projected Overspend @ mth4 £6.697m £0.857m £5.840m
Less Financial Recovery Plan Projections £3.702m £0.369m £3.333m
Residual Risk £2.995m £0.488m £2.507m 
3.  PROPOSALS 
3.1 Anticipated Outcomes

Page 38

Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2024-25 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2024-
25. 
4. IMPLICATIONS  
4.1 Financial
The outturn is an overall year-end overspend of £6.697m (2.1%). The report outlines
the main variances for individual services.  There IJBs unearmarked reserve balance
is projected to be zero by the end of the financial year and there is an ongoing risk in
relation to the £2.995m of the overspend where financial recovery improvement
actions require to be identified.  This current position poses a financial risk to North
Ayrshire Council and NHS Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
The ‘financial viability of the HSCP’ risk on our strategic risk register has increased
the risk score to reflect the 23/24 outturn and current projected 24/25 overspend. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2024-25 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout

Page 39

2024-25. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director 
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]-

Page 40

PUBLIC INFORMATION
2024-25 Budget Monitoring Report–Objective Summary as at 31st July 2024                                                                 Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 71,300 76,257 4,957 18,816 19,908 1,092 90,116 96,165 6,049 5,987 62
: Locality Services 30,392 31,227 835 5,366 5,410 44 35,758 36,637 879 795 84
: Community Care Service Delivery 36,732 40,208 3,476 0 36,732 40,208 3,476 3,447 29
: Rehabilitation and Reablement 2,099 2,116 17 0 2,099 2,116 17 35 (18)
: Long Term Conditions 987 997 10 9,459 10,373 914 10,446 11,370 924 927 (3)
: Community Link Workers 358 358 0 0 0 0 358 358 0 1 (1)
: Integrated Island Services 732 1,351 619 3,991 4,125 134 4,723 5,476 753 782 (29)
MENTAL HEALTH SERVICES 34,339 34,858 519 73,192 73,742 550 107,531 108,600 1,069 591 478
: Learning Disabilities 25,723 26,640 917 556 555 (1) 26,279 27,195 916 596 320
: Community Mental Health 6,575 6,165 (410) 1,739 1,738 (1) 8,314 7,903 (411) (400) (11)
: Addictions 2,041 2,053 12 1,899 1,899 0 3,940 3,952 12 15 (3)
: HBCCC 0 0 0 353 247 (106) 353 247 (106) (141) 35
: Lead Partnership Mental Health NHS Area Wide 0 0 0 68,645 69,303 658 68,645 69,303 658 521 137
CHILDREN & JUSTICE SERVICES 39,130 40,018 888 4,915 5,161 246 44,045 45,179 1,134 1,583 (449)
: Irvine, Kilwinning and Three Towns 3,054 3,086 32 0 0 0 3,054 3,086 32 25 7
: Garnock Valley, North Coast and Arran 3,206 3,249 43 0 0 0 3,206 3,249 43 40 3
:Intervention Services 1,716 1,715 (1) 0 0 0 1,716 1,715 (1) 7 (8)
: Care Experienced Children & Young people 27,185 28,554 1,369 0 0 0 27,185 28,554 1,369 1,721 (352)
: Head of Service - Children & Families 1,082 558 (524) 0 0 0 1,082 558 (524) (471) (53)
: Justice Services 2,472 2,472 0 0 0 0 2,472 2,472 0 0 0
: C&F Health Team 415 384 (31) 4,203 4,449 246 4,618 4,833 215 261 (46)
: Lead Partnership NHS Children's Services 0 0 0 712 712 0 712 712 0 0 0
CHIEF SOCIAL WORK OFFICER 1,561 1,573 12 0 0 0 1,561 1,573 12 (62) 74
PRIMARY CARE 0 0 0 53,109 53,109 0 53,109 53,109 0 (42) 42
ALLIED HEALTH PROFESSIONALS 0 10,306 10,306 0 10,306 10,306 0 0 0
MANAGEMENT AND SUPPORT COSTS 9,038 8,500 (538) 4,407 3,652 (755) 13,445 12,152 (1,293) (1,361) 68
FINANCIAL INCLUSION 970 972 2 0 0 0 970 972 2 (13) 15
OUTTURN ON A MANAGED BASIS 156,338 162,178 5,840 164,745 165,878 1,133 321,083 328,056 6,973 6,683 290
Over/
(Under)
Spend
Variance at
Period 3
Movement in  
variance
from Period
3
TOTAL
Partnership Budget - Objective Summary
Council Health
2024/25 Budget

Page 41

PUBLIC INFORMATION 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Return Hosted Over/Underspends East 0 0 0 0 (215) (215) 0 (215) (215) (171) (44)
Return Hosted Over/Underspends South 0 0 0 0 (188) (188) 0 (188) (188) (149) (39)
Receive Hosted Over/Underspends South 0 0 0 0 204 204 0 204 204 204 0
Receive Hosted Over/Underspends East 0 0 0 0 (77) (77) 0 (77) (77) (12) (65)
OUTTURN ON AN IJB BASIS 156,338 162,178 5,840 164,745 165,602 857 321,083 327,780 6,697 6,555 142
Over/
(Under)
Spend
Variance at
Period 3
Movement in  
variance
from Period
3
Partnership Budget - Objective Summary
2024/25 Budget
Council Health TOTAL

Page 42

PUBLIC INFORMATION
2024-25 Savings Tracker          Appendix B 
Social Care:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 4
2024/25
Saving
Description of the Saving
Children, Families & Criminal Justice
Service redesign Amber Blue 0.123 Restructure areas of specialist service provision including
substance use and corporate parenting, embedding the roles and
functions of those teams within our locality-based early intervention
approaches and strategic planning including engagement.
Community Care & Health
Review of Day Care provision Amber Blue 0.100 Carry out a review and streamline day care provision.
Sensory Impairment Team Green Blue 0.062 Remove the dedicated management post and realign the team into
core social work teams.
Care Home places Green Amber 0.375 Reduce the number of funded care home places by 15, leaving
budgetary provision for 765 places at average cost.
Charging for community alarm provision
to sheltered housing tenants
Amber Amber 0.200 Introduce a charge for community alarm provision in council
sheltered housing units to ensure an equitable approach across all
housing tenures.
Montrose House capacity Green Blue 0.111 Restrict the capacity at Montrose House care home to the current
level of residency.
Voluntary Early Release Green Blue 0.174 Recurring savings achieved by the release of back-office staff
through the council's voluntary early release scheme.
Carers Strategy funding Green Blue 0.384 Utilise the remaining Carer's Strategy funding to invest in respite
provision and short breaks for carers and to support existing
investments in services which support unpaid carers.
Increase to charging Green Blue 0.131 Increase charges for non-residential care by 10% and charges for
residential care by 5%
Remove vacant posts Green Blue 0.280 Remove a number of vacant posts across support services.
Employers' superannuation contributions Green Blue 7.238 Align the budget to the new employer superannuation contribution
rates from 1st April 2024.
Payroll Turnover Green Blue 0.077 Increase targets for payroll turnover through the recruitment
process.
TOTAL SOCIAL CARE SAVINGS 9.255
North Ayrshire Health and Social Care Partnership
2024/25 Savings
Support Services and Partnership-wide savings

Page 43

PUBLIC INFORMATION 
Health:
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
Month 4
2024/25
Saving
Description of the Saving
Hospital Based Complex Continuing
Care (HBCCC) provision
Green Green 0.500 Align the budget to the level of ongoing need for HBCCC provision.
Increase recharge to East Ayrshire for
beds at Woodland View
Green Blue 0.021 Apply an inflationary increase to the recharge to East Ayrshire
HSCP.
Community Recovery and Rehab
provision
Amber Amber 0.100 Review and streamline a range of current provisions to remove
duplication.
Enhanced ICT Green Green 0.100 Carry out a review of the service delivery model and release
recurring staffing savings.
Payroll Turnover Green Blue 0.314 Increase targets for payroll turnover through the recruitment
process.
TOTAL HEALTH SAVINGS 1.035
TOTAL NORTH HSCP SAVINGS 10.290

Page 44

PUBLIC INFORMATION
2024-25 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     156.190
Adjustments to baseline     (0.574)
Less Resource Transfer 23/24     (24.640)
Revised Budget     130.976
Resource Transfer 24/25 1-3 P 24.861
Realign Girfec Team To Connected
Communities 1-3 P (0.073)
ICT Budget Transfers 1-3 P (0.006)
CJSW Funding 2425 1-3 T 0.053
Children’s Living Wage Allocation 1-3 T 0.525
Roundings 1-3   0.002
Social Care Budget Reported at Month 3 156.338
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Budget exc set aside     157.894
Add Resource Transfer 23/24     24.640
Month 10-12 Adjustments and adjusting for the
full year impact of part years amounts and
temporary funding.    
(0.033)
Revised Budget   P 182.501
Add resource Transfer 24/25     (24.861)
North Superannuation 24/25 uplift 1   1.134
MH: Anticipate Hollybush Combat Stress 24/25 1   1.424
MH: Anticipate Delivery of Veteran Funding 24/25 1   0.105
MH: Anticipate Perinatal MH, Infant MH (inc MNPI)
24/25 1   0.750
Training grade ADJ - April 1   0.063
Pecos Nurse Post  1   (0.018)
Script Switch To Pharmacy 1   (0.002)
Breastfeeding Pay Award - South 2   0.005
Nest - South 2   0.066
24-25 Foxgrove North 2   0.033
24-25 Breast Feeding - North 2   0.005
24-25 Huntingtons North 2   0.005
24-25 NEST North 2   0.066
Phlebotomy Admin Returned 2   0.005

Page 45

PUBLIC INFORMATION
23-24 - 50% North Share to East - Tier 3 Weight
Management 2   (0.077)
24-25 North Share to East - Tier 3 Weight
Management 2   (0.022)
Anticipate ADP Afc Pay Uplift 3   0.091
Anticipate ADP Drug Prevalence 3   0.084
Anticipate ADP Lived & Living Exp 3   0.013
Anticipate ADP Mat 3   0.250
Anticipate ADP National Mission 3   0.296
Anticipate ADP Residential Rehab 3   0.134
Anticipate ADP Whole Family Approach 3   0.094
Training Grade Adj - Jun 3   (0.054)
Prescribing (Ambush) North Rx 3   1.573
Prescribing (Ambush) North Rx Cres 3   (1.477)
24-25 North Budget Paper - Office 365 (to East) 3   (0.073)
24-25 North Budget Paper - Prison Pharm Contract
(to East) 3   (0.093)
South Mat Funding - Psychiatrist 3   0.029
Hd198: Early Intervention In Psychosis/ Body
Image And Social Media Resource 3   0.242
Hd203: Digital Mental Health Programme Licence
& Support 3   0.005
Reduction to the Working Week (mth 2 - 4)  4  0.105
Post to medical records 4  (0.037)
HD107: breast Feeding project funds 4  0.056
BBV 4  0.280
Anticipated budgets assumed in the report but not
yet allocated  4   2.045
Health Budget Reported at Month 4 164.745
TOTAL COMBINED BUDGET      321.083

Page 46

PUBLIC INFORMATION
24-25 IJB Reserves Position      Appendix D 
Area of Reserves
Balance at
31 March
2024
2024-25
Anticipated
Draw Downs
Projected
Balance at
31 March
2025
: Alcohol & Drug Partnership 641 (641) 0
: Mental Health Action 15 57 (57) 0
: Service Redesign / Challenge Fund 1,774 (1,202) 572
: Community Living Change Fund 377 (377) 0
: Family Wellbeing Fund 1,313 (1,313) 0
: Wellbeing Fund 50 (50) 0
: Breast Feeding Network 26 (26) 0
: MH Recovery and Renewal 546 (546) 0
: Buvidal 23 (23) 0
: Brooksby 5 (5) 0
: Cossette Funding 4 (4) 0
: Expansion of Primary Care Estates 55 (55) 0
: GP Premises Improvements - tranches 1 and
2 63 (63) 0
: Mental Health Wellbeing in Primary Care 81 (81) 0
: Dental Practice Improvement 29 (29) 0
:Appropriate Adult Scheme 2 (2) 0
:Adult Tier 3 Weight Management Service 19 (19) 0
: Phlebotomy 22 (22) 0
: LD Health Checks 66 (66) 0
Total Earmarked 5,153 (4,581) 572
Unallocated General Fund 357 (357) 0
General Fund 5,510 (4,938) 572
Earmarked Funds

Page 47

PUBLIC INFORMATION
Financial Recovery Action Plan          Appendix E 
FINANCIAL RECOVERY PLAN £m £m £m
Projected Overspend at Month 4 6.697
SERVICE AREA
Cost
reduction
target
Achieved in
projected
outturn
Still to be
achieved Target set?
Health and Community Care
Reduce care home placements in line with
budget saving (0.700) (0.086) (0.614) June IJB
Reduce CAH capacity/delay recruitment/in-
house efficiencies (0.850) 0.000 (0.850) June IJB
Community Wards - reduce supplementary
staffing and review bed capacity (0.500) (0.247) (0.253) June IJB
MH and LD (North Ayrshire)
Freeze adult community support approvals
outwith transitions 0.000 0.000 0.000 June IJB
Respite provision - ensure use of in-house
capacity is maximised 0.000 0.000 0.000 June IJB
HBCCC mitigation plan (0.106) (0.106) 0.000 August IJB
MH and LD (Lead Partnership)
Ward staffing (adults/elderly inpatients) (0.300) 0.000 (0.300) August IJB
Psychiatry (use of agency) (0.312) (0.312) 0.000 August IJB
CEDS/CAMHS (0.202) (0.202) 0.000 August IJB
North Ayrshire share (38.6%) (0.314) (0.198) (0.116)
Children and Families
Reduce children's external placements -
early reduction from Brighter Pathways work (0.500) (0.500) 0.000 June IJB
Additional target re-residential placements (0.500) (0.229) (0.271) August IJB
Additional target re-residential placements (0.225) 0.000 (0.225) September IJB
Reduce investment in C&F social work via
service redesign fund (0.300) 0.000 (0.300) September IJB
Cross Partnership
Vacancy management and temporary posts (0.500) 0.000 (0.500) June IJB
Use of remaining reserve balance (0.357) 0.000 (0.357) August IJB
Review of earmarked reserves (0.216) 0.000 (0.216) September IJB
Target Achieved Outstanding
(5.068) (1.366) (3.702)
Remaining projected overspend 2.995

Page 48

PUBLIC INFORMATION
Appendix F - Care at Home Recovery Plan 
1. Situation  
The overspend on Care at Home is reflective of an increase in the overall capacity
and complexity of need within the service, alongside a rise in service costs, as we
strive to meet the growing level of demand in our communities and to support hospital
discharge(s).  The Care at Home Service in North Ayrshire has seen a 50% increase
in the number of annual care visits in the last 4 years.   
Below summarises the budget and spend position for Care at Home Services since
2019.   
The Care at Home budget has increased significantly since 2019-20 with an overall
increase of £9.8m over that period, however most of this increase is directly related
to pay inflation with the only additional funding for additional capacity being £3.4m to
support with winter pressures.  The Care at Home budget has been relatively static
in real terms against a backdrop of a significant increase in demand. 
The Care at Home service has a budget of £30.061m for 24/25.  This is inclusive of
Care at Home services delivered via SDS Option 2 and 3.  Currently this is projecting
an overspend of £3.255m for 2024/25 financial year.   
As part of the overall Financial Recovery Plan for the IJB there is a requirement for
a reduction in current spend in-year, with a move to working towards delivering
services within budget thereafter.  A £1m savings target was identified for the Care
at Home service to deliver in 2024-25.

Page 49

PUBLIC INFORMATION
2. Background  
Self-Directed Support is the way that care and support is delivered in Scotland,
providing people with options, choice and control.  From 2019 to 2023, the landscape
for Care at Home delivery in North Ayrshire has been very fragile with 5 Care at
Home providers exiting the market for the provision of care in an unplanned basis. 
In July 2024 the delivery of Care at Home supports in North Ayrshire, via Self
Directed Support Option 3, moved to a fully inhouse model.  This change in the way
care is delivered was reflective of a number of factors including quality and the safe
delivery of care and support. 
Currently there are over 2,000 people in receipt of care and support via Care at
Home, with 92% receiving services through the Partnership’s inhouse Care at Home
service.  The Partnership utilises eligibility criteria to deploy its available resources,
with priority given to those adults with the greatest need. 
Care at Home supports are provided across the 4 mainland localities in North
Ayrshire, and on the islands of Arran and Cumbrae.  Since 2020, to date, there has
been a 40% increase in the planned hours of care delivered by the inhouse Care at
Home service, with a 50% increase in the individual number of care visits provided
over this same period. Staffing levels for the Partnership’s inhouse Care at Home
service have also increased over this same period by 50% from 653 contracted staff
in 2020 to 981 in August 2024. 
Whilst the growth in the Partnership’s Care at Home service is evident, demand for
Care at Home supports has risen by around 30% from pre pandemic levels.  Whilst
there is robust application of criteria to access services, and use of initiatives such
as reablement designed to only provide shorter term supports and to reduce levels
of dependency, social work and service delivery teams report significant changes in
the complexity of need required in supporting people in the community.  This is
demonstrated by the Job Evaluation and regrading of the Partnership’s Care at Home
Assistant role in 2023, which reflected the change in the role and the skills required
to provide more complex and intensive community Care at Home supports. 
Unfortunately, Health and Community Care teams continue to manage a significant
waiting list for community and hospital referrals which is a result of aforementioned
increase in referral activity and complexity of need. Given the waiting list for supports,
and levels of unmet need, a priority of need is applied to those who are waiting
supports – this prioritises people with care needs associated with end-of-life care,
public protection and hospital discharges.  Levels of unmet need can fluctuate and
are influenced by peaks in demand.   
Below illustrates the priority of need framework used by Care at Home services to
prioritise demand, unmet need and waiting lists from the Community and Hospital:

Page 50

PUBLIC INFORMATION 
Positively, community unmet need has reduced since December 2023 when 193
people in the community were awaiting a new package of care, with 166 waiting as
at August 2024.  Levels of delayed discharge associated with Care at Home had
shown signs of improvement earlier in 2024, however this improvement wasn’t
sustained and as at reporting in August 2024, 24 people were a delayed discharge
awaiting a package of care.  Overall, 76% of unmet need for care at home is for
people waiting in the community for care. 
The Partnership also provides a Community Alarm and Telecare service to over
4,000 people across Ayrshire.  The alarm service generates around 450k activations
on an annual basis with requests for support directed to identified contacts and,
where appropriate, to the Partnership’s responder service who provide approximately
6,000 physical responses to North Ayrshire service users on a monthly basis.  The
Community Alarm and Telecare service is in the process of transitioning from
analogue to digital technology. 
3. Plan 
As part of the financial recovery plan, targeted savings for the remainder of the
financial year 2004-25, have been identified from the Care at Home service.  The
vast majority of the service cost is workforce and any reduction in workforce will
inevitably result in reduced service capacity. 
The required service changes include a reduction in the inhouse workforce (circa
1,062 weekly hours), reduction in Self Directed Support (Option 2) spend and actions
related to the management of spend and approval of additional staffing costs linked
to vacancies and sickness absence.  It is proposed that workforce changes will be
achieved by natural turnover and a targeted recruitment freeze, alongside careful
future targeted recruitment activity to maintain safe care delivery.

Page 51

PUBLIC INFORMATION 
The planned reduction is estimated to deliver an in-year 2024-25 reduction of
£0.850m against an original target of £1m, this is deemed to be the maximum
reduction which can safely be delivered in-year. 
The reduction in Care at Home workforce will result in an overall reduction in Care
at Home capacity within the service.  Whilst efforts will be made to minimise the
impact of this and to manage any resultant risks and challenges.   
A summary of these is provided below: 
Risks/Impacts 
• Reduction in capacity will reduce the volume of Care at Home supports which
the Partnership can provide and may result in longer waiting times to receive
care
• A disproportionate impact on people awaiting services in the community as
we continue to prioritise urgent referrals and hospital discharge
• Reduction in capacity may result in increased delays in people being able to
access Care at Home supports, both from the community and to support
hospital discharge - approximate increase to the waiting list(s) combined of 56
people (3%) however this may vary dependent on hours/care requirements
• Impact on other people and services – for example length of stay in hospital,
access to community rehab beds, requirement for access to long term care
settings
• Increased reliance on informal supports and carers
• The service may be less flexible/responsive to critical care requests
• Seasonal/Winter responsiveness
• Greater risk of workforce pressures
• There will not be the same level of capacity to absorb and respond to any
potential future unplanned care provider market issues 
Whilst the above outlines the potential impact of this change and reduction in care
capacity, the below are a range of management mitigations either in place or
proposed to reduce this and to manage risk. 
Mitigations 
• Continue to follow the existing priority of need framework which ensures those
most in need of the service will be prioritised
• Weekly unmet need oversight and assurance group, which includes
arrangements for how service users are contacted whilst they wait
• Recruitment to 6-month reablement lead to re-establish and promote
reablement service provision
• Reablement Service Access pilot expansion
• Consider wider ‘access to service’ opportunities for demand management
• Care Monitoring System review to maximise efficiency in existing service
delivery
• Programme of Care at Home reviews for existing users

Page 52

PUBLIC INFORMATION
• Scaling up use of technology and Community Alarm/Telecare
• Closely monitor absence and vacancy levels on a weekly basis
• Continue to recruit to casual workforce to promote and develop contingency
options
• Refresh service wellbeing at work strategy to minimise staff absence levels
through sickness
• Protect and promote the Community Alarm and Telecare Service, particularly
to those service users awaiting a service

Page 53

PUBLIC INFORMATION
Bank and Agency Costs to Month 4      Appendix G 
1) NHS
4863
(Registered)
4864
(Unregistered)
4853
(Registered)
4854
(Unregistered) TOTAL
AAC074 NORTH CORE SLT ADULT 5,412 5,412
AAC403 WARD 1 WOODLANDS VIEW 25,510 137,942 163,452
AAC406 WARD 2 WOODLANDS VIEW 15,759 93,103 108,861
AAC410 ACH REDBURN REHAB WARD NRS 1,587 39,712 41,299
AAC412 ACH DOUGLAS GRANT REHAB WD NRS 6,446 33,955 40,400
AAD401 WARD 3 WOODLANDS VIEW NURSING 17,386 117,487 447 135,320
AAD402 WARD 4 WOODLANDS VIEW NURSING 21,871 101,551 185 123,607
AAH047 NEW CLONBEITH NURSING(JURA) 51,193 34,734 85,927
AAH415 WVIEW THE GLEN ECT 1,611 1,611
AAH417 WVIEW WARD 10 ACUTE MH NRS 22,585 31,444 54,029
AAH423 WVIEW WARD 8 ACUTE MH NRS 10,300 303,301 251 313,852
AAH460 WARD 5 WOODLANDS VIEW 5,940 9,978 15,919
AAH466 WVIEW WARD 7B REHAB MH NRS 2,103 2,103
AAH492 NEW DUNURE NURSING(CLONBEITH) 17,669 56,237 73,905
AAT001 TRINDLEMOSS 26,773 46,783 73,556
AAW047 ARRAN HOSPITAL NURSING 11,398 16,007 5,717 33,122
ACN004 PACKAGE OF CARE (P) - CY 10,198 10,198
ACN012 PACKAGE OF CARE (P) - AMG 18,187 18,187
ACN013 PACKAGE OF CARE (P) - LMO 3,368 3,368
ACP003 NC POC TEAM 3 966 966
ACA412 CAMHS UNSCHEDULED CARE 1,703 1,703
ACF002 EARLY YRS-C/F TEAM 2 290 290
ACN047 ARRAN DN 235 235
ADN000 THREE TOWNS DN 4,284 161 4,446
ADN033 IRVINE DN 9,597 9,597
ADN042 NORTH WEST COAST DN 235 99 334
ADN075 GARNOCK VALLEY DN 38,464 38,464
ADN080 NORTH DN TEAM LEADERS 3,360 3,360
ALA047 LADY MARGARET NURSING 5,935 2,012 7,947
AMA408 PREVENTION + SERVICES SPT TEAM 1,481 1,481
AML102 MH UNPACS (PRIVATE) 0 0
AML146 LD HEALTH CHECKS 51,594 51,594
AML392 NORTH CLDT 157 157
AML402 LDS MANAGEMENT 2,129 2,129
AML500 MHS INPATIENT MGT 13,137 13,137
AMN412 CMHT NURSING-NORTH AYRSHIRE 6,609 6,609
AMN415 WVIEW WARD 7C FORENSIC REHAB N 1,950 45,193 47,143
AMN419 DAY ACTIVITIES TEAM 227 227
AMN425 INTENSIVE COMMUNITY NURSING TEAM 8,845 8,845
AMN431 ADULT MENTAL HEALTH LIASION TEAM 2,295 2,295
AMN433 PCMHT NORTH 1,663 1,663
AMN446 WVIEW WARD 6 LOW SECURE NRS 27,425 79,182 106,607
AMN454 WARRIX AVE 6,071 7,342 13,413
AMN468 ACTION 15 - ADULT LIAISON 2,951 2,951
ANU632 ICFN - COMMUNITY PHLEBOTOMY 5,860 5,860
AWV438 WVIEW WARD 7A LD A+T NRS 5,532 211,353 250 217,136
AXC407 WVIEW WARD 9 ACUTE MH NRS 16,258 54,635 70,894
AXC418 WVIEW WARD 11 ACUTE MH NRS 35,370 129,107 257 164,734
TOTAL 477,553 1,603,525 5,878 1,391 2,088,346
2) SOCIAL CARE
Agency Cost
Montrose House 252,121       
Acm - Irvine 1,188          
Mh Acm 15,895        
Ld Acm 7,826          
TOTAL 277,030       
Bank Agency