Page 1

NORTH AYRSHIRE COUNCIL
27 August 2024
Cabinet
Title: Proposals for Community Investment Fund (CIF)
Expenditure
Purpose: To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects.
Recommendation: That Cabinet:
a) Reviews the applications from the Garnock Valley, North
Coast and Cumbraes and Three Towns Locality
Partnerships in line with CIF criteria at appendices 1-4;
b) Approves the CIF application in relation to Beith Hive
Childcare Ltd;
c) Approves the CIF application in relation to the North
Coast and Cumbraes Locality Priorities Officer;
d) Approves the CIF application in relation to Parent
Network Scotland; and
e) Approves the CIF application in relation to the Three
Towns Community Shed.
1. Executive Summary
1.1 Within its budget for 2017-18, North Ayrshire Council provided a funding allocation
for the creation of an innovative fund to enable communities to address the priorities
they have identified through Local Planning Partnerships and within the context of
North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. In June 2021, Cabinet approved a
further £1m top-up for the funding, with a further £2m added in November 2021.
1.2 Locality Partnerships have subsequently continued to work on their local action
pans and are refining proposals for expenditure in line with their locally identified
needs. It is a testament to the dedication of the Locality Partnerships and their
community partners that proposals are continuing to emerge to provide creative
approaches to addressing local challenges.
1.3 This report brings forward proposals which respond to the specific needs of the local
community, and which have been developed based on local circumstances and
opportunities.

Page 2

2. Background 
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they
have identified through Locality Planning Partnerships and within the context of
North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. A further £3m was added to the
funding in 2021, to be distributed among localities as follows: 
Locality Value of
CIF from
first funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from second
funding
allocation
(June 2021)
Value of CIF
from third
funding
allocation
(Nov 2021)
Total
balance
available
Irvine £754,000 £958,358 £290,000 £580,000 £665,642
Kilwinning £286,000 £322,190 £120,000 £240,000 £323,810
Three
Towns
£598,000 £937,561 £240,000 £480,000 £380,439
Garnock
Valley
£390,000 £415,103.04 £150,000 £300,000 £424,896.96
North Coast £468,000 £444,459 £170,000 £340,000 £533,541
Arran £104,000 £125,079 £30,000 £60,000 £68,921
TOTAL £2,600,000 £3,170,113.04 £1,000,000 £2,000,000 £2,429,886.96 
2.2 It was agreed that the CIF awards would range between £5,000 and £100,000 for the
community organisations, as defined in the CIF guidance, in order to support
proposals and projects that connect with:
• The North Ayrshire Fair for All Strategy, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and Locality priorities;
• North Ayrshire Council’s values, priorities, and business objectives; and
• The Community Wealth Building and Environmental Sustainability and Climate
Change strategies;

Page 3

And will also: 
• Fulfil a compelling need and not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of
people possible;
• Exhibit project and/or organisational innovation in their approaches to their work
in their way of addressing community challenges and in their request to Locality
Partnerships and the Council;
• Come from organisations that are financially viable (can provide financial
statements upon requests) and efficiently and effectively managed. This can
include an organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement
and volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a
regular basis. 
2.3 The proposal development and application process has been agreed as follows: 
• Locality Partnerships should continue to engage with their communities and
stimulate interest in the CIF. Each Locality Partnership will then strategically
access the applications, make links, and look at the funding ‘in the round’
• If the partnership supports a bid then the group will be encouraged to submit a full
application form, which they will decide upon before making a proposal to Cabinet
for final approval
• The proposal will go to the next suitable Cabinet for final approval 
2.4 The enclosed applications at appendices 1-5 have been developed by community
partners and North Ayrshire Council officers and are now recommended for
approval by Cabinet. Each application is outlined in turn in the following
paragraphs.
2.5 The Garnock Valley Locality Partnership 
The allocation and funds committed to date are outlined in the table below: 
The Garnock Valley Locality Partnership CIF allocation
to date:
£840,000
Garnock Valley Mens Shed - Project Initiation £28,000
Travel Needs Analysis £25,000
Geilsland Hall - Volunteering and Employability £45,000
Garnock Valley 20:20 Vision £15,000
Beith Community Development Trust - YOUth Lead £43,500
Garnock Valley Mens Shed - Heating System Replacement £20,000
Café Solace - Development Worker £49,723
Geilsland Courtyard Feasibility Study £15,582
Beith Playpark £100,000
Beith Community Association £22,098.04
Garnock Valley 2023 Development Worker £51,200 
Balance 
£424,896.96

Page 4

2.5.1 Proposal: Beith Hive Childcare Ltd. (£41,000)
2.5.2 Beith Hive Childcare Ltd. is a not-for-profit social enterprise wholly owned by
Beith Trust and integral to their mission for community-led regeneration. The
enterprise was established in 2022 by the Trust to address the Garnock Valley’s
post-pandemic economic challenges, by mitigating the impact of childcare
service closures and meeting rising childcare demand as parents return to work.
The service provides a full year, flexible childcare service for parents in work, in
education or children referred as in need of nurture or respite for vulnerable
families. 
2.5.3 A working agreement is in place between the Hive, Beith Primary School and
North Ayrshire Council to provide access to accommodation without charge. This
recognises the important role of the Hive in providing reliable, full year childcare
within the area. 
2.5.4 To ensure all Garnock Valley families, especially those in vulnerable or
economically challenging situations, have access to registered wrap-around
childcare, supporting economic, educational and personal growth Beith Hive
plan to introduce an electric vehicle (EV) drop-off and pick-up (DOPU) service to
Garnock Valley primary schools, targeting rurality and the transport barriers that
affect parents.
2.5.5 The funding requested from the Community Investment Fund will be used to
develop this DOPU service and will support:
• a nine-seater Electric Vehicle and the installation of charging points at Geilsland
Estate to provide power for the vehicle,
• a contribution to staff costs to develop the EV service, both within Beith Hive
childcare service and through partnerships with other organisations or services.
2.5.6 The project has been designed using information from the Travel Needs Analysis
in development by the Garnock Valley Locality Partnership Working Group, and
information provided by service users through a survey. It supports all three of
the Locality Partnership priorities of Moving Around, Work and Local Community
and Facilities and Amenities, as well as linking directly to the Community
Planning Partnership priorities of Work and World.
2.6 The North Coast and Cumbraes Locality Partnership
The allocation and funds committed to date are outlined in the table below: 
The North Coast & Cumbraes Locality Partnership CIF
allocation to date
£978,000
Organic Growers of Fairlie £22,800
Clearer Minds £30,200
Millport Town Hall £200,000
Sing Your Song (WKCIL) £14,892
Locality Priorities Worker £35,948
West Kilbride Technical & Creative Training Programme £76,605

Page 5

Locality Priorities Worker - extension of support £41,871
West Kilbride Sports Club £6,750
Largs Scottish Women’s Institute £15,393
Balance £533,541 
2.6.1 Proposal: North Coast and Cumbraes Locality Priorities Officer (£52,000)
2.6.2 In 2020, the Locality Partnership approved a funding proposal for a Locality
Priorities Officer with an extension to the project taking place in 2022. The post
provides a Community Development Worker who is focused on the priorities of
the partnership and on developing capacity and supporting communities to be
able to deliver on these priorities. 
2.6.3 The Partnership now wish to extend this project for a further 18 months. The work
of the post holder will continue to help to increase social inclusion by ensuring
more opportunities are available and more people are connected to them. The
post holder will also continue to focus on the priority of improving mental
wellbeing, in particular stress and anxiety of younger people. In addition, they will
support the development of the Cumbrae sub-group which the partnership has
recently agreed to establish.
2.6.4 Following the previous awards associated with this project, the cumulative costs
including the additional proposed award would be a total of £129,819 (2020
award: £35,948, 2022 award: £41,871). While the usual limit of a CIF award is
£100,000, this threshold has been exceeded previously in specific
circumstances. The North Coast Locality Partnership is aware of the total cost
and wish to retain the post for the further 18 months to allow the capacity building
work within the community to continue to mature with appropriate support. 
2.6.5 The project contributes directly to all locality priorities and supports community
led local activity which ensures ongoing sustainability of the activities to deliver
on the priorities. The work of the post holder is shaped by their ongoing
engagement with local communities. The full proposal is included as Appendix 2
for consideration. 
2.7 Proposal: Parent Network Scotland (PNS) (£99,393) 
2.7.1 Parent Network Scotland (PNS) is a national charity providing education and
training to parents since 1990. PNS provide a ‘parenting journey’ through the
Scottish Parent Academy to support parents to gain the skills and qualifications
to support a more nurturing, resilient family life and to educate families living in
Scotland and the general public in more effective ways to care for children and
in the importance of sound relationships.
2.7.2 Through the Parent Academy, the North Coast and Cumbrae programme will
consist of two Parent Facilitators who will support Volunteer Parent Group
Leaders to enhance the offer and range of opportunities to families on the North
Coast. PNS have been active in North Ayrshire in various ways for over 15 years,
and already have links with partners and families in the North Coast area which
the project will build upon. 
2.7.3 The programme will provide evidence-based parenting activity and capacity
building in local communities across the North Coast. It will target over 100

Page 6

families in the lifetime of the programme and employ a team comprising of two
fully trained peripatetic facilitators and a part time Volunteer Co-ordinator (year
two) to support the project. Parents will be offered courses which will help to
explore relationships, coping strategies, reduce stress and build stronger
connections with their children. At first the programme will build soft skills and
relationships with parents, then supporting the development of life skills such as
communication and assertiveness, with a goal of creating a skilled community of
parents who support each other. 
2.7.4 The programme also supports the Community Planning Partnership priorities of
work and wellbeing. PNS are working with Glasgow Kelvin College to provide
SCQF accreditation for appropriate courses on the programme. The full proposal
is included as Appendix 3 for consideration. 
2.8 Three Towns Locality Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Three Towns Locality Partnership CIF allocation to
date:
£1,318,000
Ardrossan Community Development Trust £25,000
Three Towns Growers £100,000
The Training Station £50,000
Ardrossan Castle Heritage Society £17,912
Raise Your Voice For Ardeer £100,000
Ardrossan Community Sports Hub £43,320
Winton Circus Playpark £48,288
Ardrossan Community Development Trust - Development
Officer £53,100
Raise Your Voice For Ardeer – increased cost for multipurpose
hub) £130,000
Ardrossan Community Association (Whitlees)
£48,586
Ardrossan Community Sport - Winton Park 3G £100,000
CHAP – Advice Outreach
£45,767
Ardrossan Scouts £100,000
Saltcoats Active Lifestyle Group (SALT) £45,600
Stevenston Community Council – Street Signage £29,988
Balance £380,439

Page 7

2.9. Proposal: Three Towns Community Shed (£56,850) 
2.9.1 The Community Shed are a community organisation offering a safe place for all
over 18s to meet and either partake in a range of vocational activities of their
choice or simply sit and make friends over a cup of tea or coffee. The Community
Shed has recently been created through the merging of the Men’s Shed and the
She Shed and is open all adults in the area.
2.9.2 The Shed have recently acquired new premises which require some upgrading
to make them suitable for the needs of all Shed members and for accessibility,
including female toilet provision, disabled toilet provision, insulation and the
creation of suitable administrative office space. 
2.9.3 At present the Shed already have a waiting list of members who cannot join due
to the constraints of the facilities currently. This is without active promotion, which
they intend to do once the work on the facilities is complete. 
2.9.4 The Shed have committed some of their own funding to the work and secured
support in kind from various suppliers. The funding requested from CIF would be
used to cover the costs of architect plans and some of the required building works
to upgrade the facilities.

Page 8

2.9.5 The work of the Shed supports the locality priorities, in particular regenerating
community facilities and improving community wellbeing, as well as the
Community Planning Partnership priority of wellbeing. Full details are included
in the application which is included as Appendix 5. 
3. Proposals
That Cabinet: 
a) Reviews the enclosed applications from the Garnock Valley, North Coast and
Cumbrae and Three Towns Locality Partnerships in line with CIF criteria at
appendices 1-5;
b) Approves the CIF application in relation to Beith Hive Childcare Ltd;
c) Approves the CIF application in relation to the North Coast and Cumbrae
Locality Priorities Officer;
d) Approves the CIF application in relation to Parent Network Scotland; and
e) Approves the CIF application in relation to the Three Towns Community Shed. 
4. Implications/Socio-economic Duty 
Financial
4.1 CIF funding is allocated within existing resources.
Human Resources
4.2 None. 
Legal
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community
cohesion and advance community empowerment. Each of the CIF proposals is
tested against that purpose before being presented to Cabinet. 
Climate Change and Carbon 
4.5 Environmental and sustainability along with climate change and carbon
reduction opportunities are considered in relation to each CIF application.

Page 9

Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
strategic aims:
 To transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people.
 We will have active, inclusive, and resilient communities.
 A Community Wealth Building Council that is efficient and accessible,
maximising investment and focusing resources towards ourpriorities. 
Community Wealth Building 
4.7 The applications support the following pillars of community wealth building: 
 Financial Power: Listening to communities and local enterprises to
maximise the impact of financial investment and grow local business,
enhance innovation and empower communities. 
 Land and Assets: Maximising the function and ownership of local physical
assets for the benefit of communities and enterprises. 
5 Consultation
5.1 The proposals contained within this report have been developed by the
Locality Partnerships, through consultation with local people, including
youngpeople. 
David W. Hammond
Executive Director (Communities and Housing) 
For further information please contact Rhonda Leith, Head of Service
(Connected Communities), on 01294 324415. 
Background Papers 
Appendix 1: CIF Application Beith Hive Childcare Ltd.
Appendix 2: CIF Application North Coast and Cumbraes Locality Priorities Officer
Appendix 3: CIF Application Parent Network Scotland
Appendix 4: CIF Application Three Towns Community Shed

Page 10

No embedded text on this page.

Page 11

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
The CIF will support proposals and projects that: 
• Connect with:
o the Community Planning Partnership (CPP) and Locality priorities; and 
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’. 
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval. 
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible: 
Christina Pieraccini
Locality Officer - Garnock Valley
Connected Communities
North Ayrshire Council
Walker Hall
45, Main Street
Kilbirnie
KA25 7BX 
Tel: 01505 680203
Mob: 07966 160854
Email: cpieraccini@north-ayrshire.gov.uk 
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf

Page 12

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
1. Details of your organisation 
Name of Organisation 
Beith Hive 
Postal Address for Correspondence
Click or tap here to enter text. 
Name of Contact Person Jane Lamont 
Position in Organisation CEO 
Telephone Number Click or tap here to enter text. 
Email Address 
Total amount of funding requested:  £41000
Match funding (if any): 
£37700 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence. 
Beith Hive Childcare Ltd, is a not for profit social enterprise wholly owned by Beith
Trust and integral to their mission for community-led regeneration.  The enterprise was
established in 2022 by Beith Trust to address the Garnock Valleys post-pandemic
economic challenges, by mitigating the impact of childcare service closures and
meeting rising childcare demand as parents return to work.   
Following a series of discussions with North Ayrshire Council, Beith Primary and
negotiations with ChildsPlay - the existing service which was closing, Beith Trust took
over 4 full time staff members, and the attendee role of 52 children and established a
registered childcare service operating primarily from Beith Primary School with a full
year service, providing flexible child care provision for parents in work, in education or
children referred as in need of nurture or respite for vulnerable families.   This
intervention ensured that local families retained childcare provision.

Page 13

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
Since then, Beith Trust have invested time, energy and resource to design an
enterprise, which provides the communities of the Garnock Valley with a quality,
sustainable registered childcare option, which is a crucial part of a community’s social
infrastructure. 
The service operates from 7am - 9am and 3pm – 6pm.  There are 300 places
available to book each week and parents have the flexibility to book regular slots
each week and also ad hoc slots via an app or the online website.  Since May 2024,
the service offer has increased to provide parents and carers with a full year service
with school holiday provision. 
The following diagram illustrates the group structure which supports Beith Hive
Childcare Ltd and Geilsland Enterprise as wholly owned subsidiaries of the parent
charity, Beith Trust.  Both subsidiaries operate with their own management teams and
board of directors, but are ultimately accountable to the Beith Trust Board, ensuring
alignment with Beith Trust’s mission of sustainable community regeneration,
benefiting Beith’s people, places, and businesses.

Page 14

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for. 
Please include: 
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
Beith Hive is based at Beith Primary school and offers a flexible, wrap around childcare service
to parents and carers in the Garnock Valley.  To ensure all Garnock Valley families, especially
those in vulnerable or economically hard-hit situations, have access to registered wrap-around
childcare, supporting economic, educational and personal growth Beith Hive plan to introduce
an electric vehicle (EV) pick-up and drop-off (DOPU) service Garnock Valley primary schools,
targeting rurality and the transport barriers that parents are affected by. 
Our service is supported by a working arrangement between Beith Primary and North Ayrshire
Council who provide the venue at no cost in recognition of the value and socio- economic
impact that access to quality registered childcare amidst the socio-economic challenges that
affect the Garnock Valley 
Moreover, our partnership with Beith Trust underpins a committed to environmental
sustainability - our Electric Vehicle Service will be powered by a community-owned renewable
energy project - a 100 kWh solar array on the roofs of the buildings at Geilsland Estate.  This
will save, on a like for like per journey basis over 1000 miles,  120kg of Co2 per year, we
estimate that the service actually avoid 6 cars making the same journey which amplifies the
estimated Co2 saving.   
To ensure the Beith Hives success, widen our reach across the Garnock Valley and deepen
its impact, we seek a contribution towards funding for 
- a 9 seater Electric Vehicle and the installation of charging points at Geilsland Estate to
provide power for the vehicle, 
- Contribution to staff costs to develop the EV service, both within Beith Hive childcare
service and through partnerships with other organisations or services.  Specifically,
this staff role will
• Manage the role out of a DOPU service expansion, 
• Ensure that Beith Hive operations align with environmental sustainability
and social inclusiveness aims.

Page 15

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
• Engage with community stakeholders and the Garnock Valley Locality
Working group to explore the feasibility options for community transport
provision (out with the times that the EV is needed for childcare pick up and
drop off),   
• Capturing, monitoring and reporting project outputs and outcomes
• Establish an innovative childcare model which suit the needs of 21st
century community life, whilst also ensuring Beith Hives long-term
sustainability.

Page 16

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
4. What difference will this project make within the locality and to local
services and programmes? 
Please include: 
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Moving
Around (Public Transport, Traffic and Parking) 2. Work and Local Community
3. Facilities and Amenities 
By addressing key transportation barriers, promoting environmental sustainability, and
supporting the socio-economic development of families, this project will make a
significant and positive difference within the locality, aligning with all of the Locality
Partnership priorities and fostering a stronger, more inclusive community. 
Project Outcomes and Deliverables with Locality Partnership Priorities     
Outcomes
Deliverables
Moving Around (Public
Transport, Traffic and
Parking)
Work and Local
Community
Facilities and
Amenities
Enhanced
Accessibility to
Childcare
Implementation of
EV Service, Increase
in Childcare Usage
Reducing traffic
congestion around
schools by providing
reliable EV pick-up and
drop-off service.
Supporting parents
to maintain
employment or
pursue education by
providing reliable
childcare.
Utilising
Beith Primary
School as a
venue for the
childcare service,
enhancing use of
existing facilities.
Promotion of
Environmental
Sustainability
Reduction in Carbon
Emissions,
Integration with
Renewable Energy
Encouraging sustainable
transportation solutions,
reducing the number of
individual car journeys.
Creating job
opportunities within
the Beith Hive
childcare and EV
service.
Installing EV
charging points
at Geilsland
Estate, improving
local amenities.
Socio-Economic
Support for
Families
Increased
Employment and
Education
Opportunities,
Community
Engagement and
Service Improvement
Improving overall
transportation
infrastructure within the
community.
Engaging with
community
stakeholders to
address transport
and childcare needs.
Ensuring long-
term
sustainability of
the Beith Hive
service through
community
engagement.

Page 17

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP     
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
The development of this application was informed by
• Recommendations from the Travel Needs Analysis which will be produced
by the GV locality working group.  This will provide a starting point to design
how the vehicle could be used to pilot an initiative which tests the Travel
Needs Analysis outputs.
• Analysis of Beith Hive Childcare Drop off / Pick Up Services survey 
Analysis of the Childcare Drop-off and Pick-up Service Survey ( 52 responses) 
Overview: The dataset comprises responses from a survey conducted to gauge interest in a
childcare drop-off and pick-up service. The survey captures information such as the
respondent's location, the number and ages of their children, current childcare
arrangements, and interest in the proposed service.
Key Insights:
1. Geographical Distribution:
o Respondents are from various postcodes in the Garnock Valley, indicating
interest from each of the 3 communities.
o None of the respondents are currently using Beith Hive, a few are accessing
afterschool activity as their childcare facility. 
o Common postcodes are KA25, KA15, with PA12 featuring as well, suggesting
potential hotspots for service demand.
2. Number and Ages of Children:
o Most respondents have 1 or 2 primary school-aged children.
o Children’s ages predominantly fall within the 5-7 and 10-12 age brackets.
3. Current Childcare Arrangements:
o A significant number of respondents currently rely on family members for
childcare.
o A notable portion of respondents do not currently use any childcare services.
o Afterschool clubs are the next common option, though less frequent.
o Respondents indicate that transport to a childcare services is a significant
barrier to access

Page 18

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
4. Interest in Drop-off and Pick-up Service:
o The majority of respondents expressed interest in using the proposed service.
o This indicates a market demand and a potential gap in current childcare
offerings.
5. Preferred Payment for the Service:
o The preferred price per use identified £5 as a commonly acceptable rate.
o This information is crucial for pricing strategy and service affordability.
6. Additional Comments and Suggestions:
o Few respondents provided additional comments, but one highlighted the lack
of afterschool services in specific areas like Lochwinnoch.
o This suggests areas where the service could be particularly beneficial and
addresses unmet needs.
7. Willingness to Provide Contact Information:
o Several respondents are open to further discussions, providing their contact
details for follow-up.
Our Recommendations for moving forward:
• Targeted Marketing:
o Focus marketing efforts on areas with high interest, particularly around the
common postcodes mentioned.
o Highlight benefits for families with children in the 5-7 and 10-12 age ranges.
• Pricing Strategy:
o Consider setting the service price around £5 per use to align with respondents'
willingness to pay.
• Service Expansion:
o Address areas with identified gaps in afterschool services access. Consider a
phased rollout, starting with the regions showing the highest interest.
• Engage Interested Respondents:
o Follow up with respondents who provided contact information for further
discussions and to refine service offerings based on direct feedback.

Page 19

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
6. How will the project be managed? 
Please include: 
• How the finances will be managed 
• Does the proposed project contribute to volunteering or employment opportunities
in the Garnock Valley? Please include the number of volunteering opportunities and
employment opportunities
• If there are any staff requirements, please outline your HR plans 
Financial Management
• Budgeting and Monitoring: The finances for the project will be managed through a
detailed budget plan, monitored on a monthly basis to ensure alignment with
projected costs and revenues. The budget will include all capital and operational
expenses such as vehicle procurement, charging point installation, staff salaries, and
maintenance costs.
• Financial Reporting: Regular financial reports will be prepared and reviewed by the
Board of Directors and the finance committee to ensure transparency and
accountability. This includes quarterly financial statements and an annual audit.
• Funding and Grants Management: The project will actively seek additional funding
and grants to support its activities. All funds received will be tracked and reported to
ensure they are used for their intended purposes.
Contribution to Volunteering and Employment Opportunities
• Employment Opportunities:
o Direct Employment: The project is expected to create at least 1 new
employment positions within the Beith Hive childcare service and the EV
service
o Indirect Employment: By providing reliable childcare, the project will indirectly
support employment opportunities for parents and carers, allowing them to
maintain or pursue jobs.
• Volunteering Opportunities:
o The project will offer approximately 3 volunteering positions, engaging
community members in various capacities such as assisting with the EV service,
helping in after-school activities, and participating in community outreach and
engagement events.

Page 20

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
HR Plans
• Staff Recruitment: Recruitment for new positions will follow a transparent and fair
process, ensuring equal opportunity for all applicants. Job descriptions will be clearly
defined, and positions will be advertised widely within the community.
• Training and Development: Comprehensive training programs will be provided to all
new hires and volunteers to ensure they are well-equipped to perform their roles
effectively. Ongoing professional development opportunities will also be offered.
• Performance Management: A performance management system will be implemented
to regularly evaluate staff performance, provide feedback, and identify areas for
improvement.
• Employee and Volunteer Support: A support system will be established to address
the needs and concerns of both employees and volunteers. This includes regular
check-ins, access to resources, and recognition programs to acknowledge their
contributions.
These plans will ensure the project's financial sustainability, promotes local employment
and volunteerism, and aligns with the Locality Partnership priorities to support a stronger,
more inclusive community in the Garnock Valley.

Page 21

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
North Ayrshires Venture Trust - £30k over 3 years 
Beith Trust - £12k start-up costs 
Beith Trust - £10k director’s loan x 2 years 
Amount of funding requested (£) 41000 
Please give a breakdown of cost and recent quotations where appropriate. 
Item Cost  Quotation Supplied (Y/N)
Electric Vehicle  40000 Y
Project Lead contribution
x 2 years 
30000 N
H & S 500 N
Insurances & Systems  1000 N
Repairs & Maintenance  1200 N 
EV Charge Point
Installation 
6000 Y 
Please give a breakdown of details of match funding (if any) 
Funder Amount Funding Secured (Y/N)
UKSPF  35000 Y   
Click or tap here to enter text.

Page 22

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in place. 
Beith Hive will utilise Beith Trusts existing monitoring and evaluation system (Upshot),
a digital tool designed to effectively track and analyse project performance. The
Upshot system provides real-time data and reporting capabilities to ensure effective
monitoring.  We will conduct monthly reviews of the collected data will be conducted
to assess the project's progress against its goals and objectives. 
This system will provide us with a clear, integrated view of our engagement efforts and
their tangible results. Activities and Targets will directly relate to the employee’s work
plan which will enable the workgroup and partners to objectively to assess quantitative
and qualitative data for impact and effectiveness, providing a practical M&E framework
that ensures that GV2023 meet its objectives whilst remaining flexibility to pivot to the
community's changing needs. 
This includes completing the CIF monitoring form and seeking evaluations from the
Locality Partnership and the working group. These evaluations will focus on the
project's alignment with Locality Priorities and the GV2023 report. 
Further M & E checks and balances will be provided through regular updates to the
Locality Partnership and the working group to ensure ongoing alignment with our
objectives. Progress will be measured against targets and work plans, with the
understanding that adjustments may be necessary. 
Monitoring:
• Ongoing Data Collection: 
o Continuous data collection on service usage, customer satisfaction, and
environmental impact will be conducted using surveys, feedback forms,
and monitoring tools.
• Upshot System: 
o The Upshot system will be used to track and analyse performance
indicators including the number of users, service frequency, estimated
CO2 reductions, and financial performance. 
Evaluation:

Page 23

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
• Quarterly Reports: Quarterly evaluation reports will be prepared to summarise
the project's performance, identify areas for improvement, and make necessary
adjustments.
• Annual Impact Assessment: An annual impact assessment will be conducted
to evaluate the overall effectiveness of the project in achieving its intended
outcomes. This will include analysing the socio-economic benefits,
environmental impact, and community engagement.
• Stakeholder Feedback: Regular feedback sessions with stakeholders, including
parents, carers, school staff, and community members, will be held to gather
insights and suggestions for improvement. 
This comprehensive approach ensures the project's financial sustainability, promotes
local employment and volunteerism, aligns with the Locality Partnership priorities,
and incorporates robust monitoring and evaluation processes to support a stronger,
more inclusive community in the Garnock Valley.

Page 24

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
The CIF will support proposals and projects that:
• Connect with:
o the Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis.
When to apply and how?
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible:
Louise Riddex
Locality Officer (Kilwinning & North Coast)
Connected Communities
Community Development Team
St John's Primary School
Morrison Avenue
Stevenston
KA20 4HH
Email: lriddex@north-ayrshire.gov.uk
Tel: 01294475913
Mob:
For more information see the guidance form here: https://northayrshire.community/wp-
content/uploads/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf

Page 25

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
1. Details of your organisation
Name of Organisation 
North Coast Locality Partnership
Postal Address for Correspondence
C/O CLD Base, St Johns Primary School, Morrison Ave, Stevenston
Name of Contact Person Louise Riddex
Position in Organisation Locality Officer
Telephone Number
Email Address
Total amount of funding requested: £52,000
Match funding (if any):
2. Brief description of your organisation
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence.
The North Coast and Cumbraes Locality Partnership is a partnership which provides
support for the communities of the locality to tackle the issues that they have identified
as priorities for their Local area. These are outlined in the Locality Plan. The
partnership meets four times each year to oversee this work and direct and allocate
any actions needed to achieve the locality priorities. They provide strategic oversight
and coordination to improve lives and outcomes in the area.
Our Locality Partnership is made up of:
• The Chair – Cllr Allan Hill
• All other Elected Members for the North Coast Locality
• Russell McCutcheon – North Ayrshire Council (Senior Lead Officer)
• Rhonda Leith – North Ayrshire Council (Connected Communities)
• Public Health Representative

Page 26

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
• Police Scotland Representative
• Scottish Fire and Rescue Service Representative
• Third Sector Interface Representative
• KA Leisure Representative
• The Chair of the Community Councils
• Connected Communities – Locality Co-ordinator
• Co-opted members: We can also co-opt representatives who have knowledge
or expertise in specific areas of the partnership. Experience)

Page 27

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
3. Title and summary of proposal
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for. 
Please include:
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved.
North Coast and Cumbraes Locality Priorities Officer
This funding is requested to extend the existing post by a further 18 months. The
original application was made in 2020 with an extension taking place in 2020. The
post provides a Community Development Worker who is focused on the priorities of
the partnership and on developing capacity and supporting communities to be able
to deliver on these priorities. 
The partnership has agreed in principle that they wish to extend this work for a
further period of 18 months to allow further progress, and this application provides an
opportunity for them to formalise this decision should they so choose.

Page 28

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
4. What difference will this project make within the locality and to local
services and programmes?
Please include:
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Improving
access to financial services 2. Increasing social inclusion 3. Improving mental
wellbeing 4. Supporting skills and work opportunities.
We know that there are inequalities within the communities of the North Coast and
Cumbraes. 
• Many of our local residents are older people, and they may face specific
challenges in relation to social isolation, bereavement and access to
services. This is an increasing population trend. By 2026, it is estimated
more than a third of residents will be aged 65yrs+.
• While the North Coast and Cumbraes has traditionally been viewed as a
more affluent part of North Ayrshire there are individuals and families who
really struggle with issues relating to poverty. The Scottish Index of Multiple
Deprivation 2016 registered the datazone of Largs Central & Cumbrae 04
within the top 15% most multiply deprived areas in Scotland. Given the
upcoming concerns around fuel and poverty, this post would also have a
focus on looking to help address this.
• While a range of services are available within the larger town centres the
more rural communities do not have the same access to services, the
worker will look map what services are available.
Through supporting the development of community initiatives and capacity in
communities to deliver these, the post holder will help to increase social inclusion
by ensuring more opportunities are available and more people are connected to
them. The post holder will also continue to focus on the priority of improving mental
wellbeing, in particular stress and anxiety of younger people. In addition they will
support the development of the Cumbrae Sub Group which the partnership has
recently agreed to establish.

Page 29

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
5. What engagement has taken place in relation to the project?
Please include the number of people who have been engaged with or consulted as
well as the range of people.
The post holder has engaged with a wide range of people and groups across the
locality as part of the ongoing work. Evidence of this is provided to the partnership on
a quarterly basis in the update reports on the project.

Page 30

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
6. How will the project be managed?
Please include:
• How the finances will be managed
• Does the proposed project contribute to volunteering or employment
opportunities in North Coast? Please include the number of volunteering
opportunities and employment opportunities
• If there are any staff requirements, please outline your HR plans
The post would continue to sit within the Connected Communities Locality Team. The
post holder has been part of this team until now and the continuity and HR processes
which this offers ensures that there would be no disruption to their work.

Page 31

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
7. Amount of funding being requested
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) 52,000
Please give a breakdown of cost and recent quotations where appropriate.
Item Cost Quotation Supplied (Y/N)
Locality Priorities Worker
salary and oncosts – 18
months @ 21 hours/week
plus potential severance
costs
£52,000
Please give a breakdown of details of match funding (if any)
Funder Amount Funding Secured (Y/N)
Click or tap here to enter text.

Page 32

COMMUNITY INVESTMENT FUND
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
8. Monitoring and evaluation process
Please include detail on the monitoring and evaluation processes planned or in
place.
The post holder will continue to report on a quarterly basis to the partnership on the
progress of their work.
In addition, as part of the Locality Team their work will be included in the ongoing CLD
monitoring and evaluation processes to ensure quality assurance and performance
management.

Page 33

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
The CIF will support proposals and projects that: 
• Connect with:
o The North Ayrshire Fair for All Inequalities Strategy;
o the Community Planning Partnership (CPP) and Locality priorities; and 
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’. 
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval. 
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible: 
Louise Riddex
Locality Officer (Kilwinning & North Coast) 
Economy and Communities
Community Development Team
St John's Primary School
Morrison Avenue
Stevenston
KA20 4HH 
Email: lriddex@north-ayrshire.gov.uk
Tel: 01294475913
Mob: 07980964858 
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf

Page 34

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
1. Details of your organisation 
Name of Organisation 
Parent Network Scotland 
Postal Address for Correspondence
199 Sauchiehall St  G23EX 
Name of Contact Person Jackie Tolland 
Position in Organisation CEO 
Telephone Number 
Email Address 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence. 
Parent Network Scotland (PNS) is a national charity providing education and training
to parents since 1990. PNS provide a ‘parenting journey’ through our Scottish Parent
Academy to support parents to gain the skills and qualifications to support a more
nurturing, resilient family life. Educate families living in Scotland and the general
public in more effective ways to care for children, and in the importance of sound
relationships.
ii) Assist parents and carers, especially those most in need, to improve and enrich
family relationships. In furtherance thereof, but not otherwise, the company shall
seek to
a. To provide courses and ongoing support for parents and carers
b. To design and adapt courses to the needs of parents

Page 35

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
c. To provide information and resources to assist parents in their efforts to enhance
family well-being
d. To provide individuals with accredited training and certification in the delivery of
Parent Network Scotland courses and ongoing
support; and to authorise, oversee and support them in all aspects of their work for,
and in association with, Parent Network Scotland
e. To provide opportunities for parents to deliver the services provided by Parent
Network Scotland, especially those who have previously participated in its courses
f. To provide training for professionals working in the fields of child care, education,
health and family welfare
g. To co-operate, and work in partnership, with statutory and voluntary sector
agencies providing similar and complementary services
h. To insure that the parents voice is heard in the development of national and local
policies relating to family life.

Page 36

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for. 
Please include: 
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
Parent Network Scotland (PNS) is a national charity who has been in operation in
Scotland since 1990. We support families through the Scottish Parent Academy:- 
• delivering of a wide range of course for parents starting with our evidence-based
Parenting Matters and programmes ranging from the early years to teenage years 
• builds parenting skills, confidence, and resilience to manage family relationships 
• supports parents and carers on an on-going basis to become the Volunteer Parent
Group Leaders in their own community. Our methodology of delivery is ‘for parents
by parents’; all PNS work has a peer led approach which is empowering and
effective in its sustainability post programme. Building local legacy project and
developing hubs is a way of ensuring families are supported locally and that support
is sustained over a longer time by those who live and work locally. 
This programme will consist of 2 Parent Facilitator who will support Volunteer Parent
Group Leaders to enhance the offer and range of opportunities to families on the
North Coast. Through the Scottish Parenting Academy (SPA) Parent Network
Scotland (PNS) provide evidence-based parenting programmes and capacity
building in local communities across the North Coast. We intend to target 105
families in the lifetime of the programme and employ a team comprising of 2 fully
trained peripatetic facilitators and a part time Volunteer Co-ordinator (year 2) to
support the project. 
The project will offer courses to explore relationships, coping strategies, reduce
stress, build stronger connections with their children. Using our SPACE programme
(supporting Parents and Children Together) will help unpick their own negative
experiences of parenting and build on their strengths to help build their capacity to
support each other and embrace the joys of parenting. We will also offer accredited

Page 37

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
training to parents that enable them to take the first step on a pathway to lifelong
learning by becoming Volunteer Parent Group Leaders. 
Our aim is to act as a catalyst for parents to develop their skills and then sustain
parent led networks fostering self-efficacy, developing natural friendships, increasing
lifelong social capital, and thereby reducing the levels of stress and isolation they
often tend to experience. Through the programme we work on strategies that
develop confidence and build resilience thereby allowing parents to tap into their own
creative and nurturing forces by converting to VPGL’s. Firstly, building soft skills to
gain trust and build relationships we will then develop life skills such as positive
communication, assertiveness, dealing with conflict, managing stress with the
emphasis being on creating a skilled community where people support each other
and create an awareness of learning and feeling supported. Through the life of this
project, we will engage with 105 families whose parents who have become
vulnerable through challenges in their lives. 
From 2 groups per year, 12 parents will take part in the Development Award we will
then continue with their CPD and offer the support group training. Year one –
Invitation to embark on Academy journey. · Development phase - Recruitment, and
engagement · Local Events · Building network of participants to engage in Parent
Group Leader programme. · Monthly drop in hubs in each town using Bookbug and
Wellbeing toolkit to build relationships. Year two · Capacity building begins. ·
Working with participants to deliver courses. · Networking/Recruitment activities
throughout the locality. · Parent Group Leader training commences. Year three ·
Sustainability – ongoing parental activities · Empowering - volunteers to lead hub
activities. · Wellbeing weekends for families · Hostelling Scotland weekend training
event celebrating success and progression. This application will underpin the Parent
Network Scotland learning model informing future strategic vision within PNS,
supported by the wider PNS team. To ensure we meet the 4 locality priorities we will
also have the additional measures to ensure the following. Improving access to
financial services. Each participant will receive a shopping voucher upon completion
of the Family Wellbeing Toolkit and Parenting Matters courses, as a thank you for
their time which will offer financial support during cost-of-living crisis. Increasing
social inclusion – the project is open to anyone in a parenting role and provides the
opportunity for parents to connect through our peer-to-peer support model. We are
an organisation for parents by parents, with a focus on inclusion our aim is to reduce
barriers and support parents to develop their confidence through our capacity
building approach.

Page 38

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
4. What difference will this project make within the locality and to local
services and programmes? 
Please include: 
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Improving
access to financial services 2. Increasing social inclusion 3. Improving mental
wellbeing 4. Supporting skills and work opportunities 
Outcome 1: 
Vulnerable Families demonstrate resiliency through increased ability to overcome
challenges, gaining success within key life transitions
Outcome 2: 
Vulnerable Parents will have increased knowledge, skills and confidence to be
effective parents through the volunteer parent group leader programme
Outcome 3: 
Vulnerable Parents build stronger formal/informal networks and support
mechanisms within their communities leading qualifications and  reduced feelings of
isolation.
Our aim is to act as a catalyst for parents to develop their skills and then sustain
parent led networks fostering self-efficacy, developing natural friendships, increasing
lifelong social capital, and thereby reducing the levels of stress and isolation they
often tend to experience. Through the programme we work on strategies that
develop confidence and build resilience thereby allowing parents to tap into their own
creative and nurturing forces by converting to VPGL’s. Firstly, building soft skills to
gain trust and build relationships we will then develop life skills such as positive
communication, assertiveness, dealing with conflict, managing stress with the
emphasis being on creating a skilled community where people
support each other and create an awareness of learning and feeling supported.
Through the life of this project, we will engage with 105 families whose parents who
have become vulnerable through challenges in their lives.

Page 39

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
From 2 groups per year, 12 parents will take part in the Development Award we will
then continue with their CPD and offer the support group training. 
Year one – Invitation to embark on Academy journey. · Development phase -
Recruitment, and engagement · Local Events · Building network of participants to
engage in Parent Group Leader programme. · Monthly drop in hubs in each town
using Bookbug and Wellbeing toolkit to build relationships. 
Year two · Capacity building begins. · Working with participants to deliver courses. ·
Networking/Recruitment activities throughout the locality. · Parent Group Leader
training commences. 
Year three · Sustainability – ongoing parental activities · Empowering - volunteers to
lead hub activities. · Wellbeing weekends for families · Hostelling Scotland weekend
training event celebrating success and progression. This application will underpin the
Parent Network Scotland learning model informing future strategic vision within PNS,
supported by the wider PNS team. 
To ensure we meet the 4 locality priorities we will also have the additional measures
to ensure the following. 
Improving access to financial services. Each participant will receive a shopping
voucher upon completion of the Family Wellbeing Toolkit and Parenting Matters
courses, as a thank you for their time which will offer financial support during cost-of-
living crisis. 
Increasing social inclusion – the project is open to anyone in a parenting role and
provides the opportunity for parents to connect through our peer-to-peer support
model. 
We are an organisation for parents by parents, with a focus on inclusion our aim is to
reduce barriers and support parents to develop their confidence through our capacity
building approach.
Parents can gain accreditation throughout their Parent Academy journey. Family
Wellbeing Toolkit – We are currently in talks with Glasgow Kelvin College to make
this a SCQF level 4 Community Achievement Award. (we could investigate if
colleges in North Ayrshire would be interested in accreditation) Parenting Matters -
Supporting family relationships SCQF level 5. This will support parents to develop
their skills and experience for future employment opportunities.

Page 40

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
We have had a strong presence in North Ayrshire for over 15 years now.  2 of our
facilitators live in the area as does one of our volunteers and we have a number of
families that we support through our fundraising efforts over the years with Xmas
vouchers/easter eggs and trips. 
Our facilitator team have participated in many events across the year including ‘Take
Time on the Road North Ayrshire Summer 2023’ in Saltcoats we engaged with 25
parents and looking forward to similar successful engagement in the upcoming
Kilbirnie and Largs events.  Through our partnership networks we have engaged with
parents within:  KA Leisure Bridgegate Hub Irvine; Millport Town Hall Community
Open Day; Drop in wellbeing sessions; Information Sessions; Parent Graduate Catch
Up Sessions; Delivered sessions Digitally and attended the Community Brokerage
Network North Ayrshire.  During one of our information sessions at Irvine Royal
Academy, we provided information to parents who attended on the night. 
Our consultation work has been attended by parents from North Ayrshire who were
involved in the Scottish government focus groups   
6. How will the project be managed? 
Please include: 
• How the finances will be managed 
• Does the proposed project contribute to volunteering or employment
opportunities in North Coast? Please include the number of volunteering
opportunities and employment opportunities

Page 41

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
• If there are any staff requirements, please outline your HR plans 
We have a strong management Board who meet quarterly and have oversight of our
finances. Please see through our articles of asocial that the organisation is well
protected. Our finance administrator manages the day to day finances and it is
reported back every month to the Chairperson then quarterly to the Board. 
Please see targets below for this application. 
Outcome 1: 
Vulnerable Families demonstrate resiliency through increased ability to
overcome challenges, gaining success within key life transitions 
Indicators Timescales
Project participants report embedding newly
acquired knowledge of resiliency and skills in
their parenting within family situations.  
28 Year 1 
35 Year 2 
42 Year 3 
Project participants report that they feel able to
assess family situations calmly and with
reduced emotional responses within changing
circumstances experienced within the family.
28 Year 1
35 Year 2
42 Year 3 
Outcome 2: 
Vulnerable Parents will have increased knowledge, skills and confidence to be
effective parents through the volunteer parent group leader programme.
Indicators Timescales
Project participants demonstrate their ability to
reflect, analyse, problem solve and make
decisions relating to the developmental and
behavioural stages of their children. 
28 Year 1
35  Year 2
42  Year 3 
Project participants report raised listening skills,
confidence, qualifications, equipping them to
positively react with issues arising in the
parenting of their children 
28 Year 1
35 Year 2
42 Year 3 
Project participants report feeling more able to
be consistent in their parenting 
28Year 1
35 Year 2
42 Year 3

Page 42

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
Outcome 3: 
Vulnerable Parents build stronger formal/informal networks and support
mechanisms within their communities leading qualifications and  reduced
feelings of isolation. 
Indicators Timescales
Project participants demonstrate increased
confidence to offer and seek support building
informal networks.
12 Year 1
18 Year 2
24 Year 3
Project participants will report reduced feelings
of isolation through being involved with other
parents and the PGL programme. 
12  Year 1
18 Year 2
24 Year 3
Project participants gain qualification and
confidence to become active in building legacy
informal peer support groups with other
participants within the programme 
12 Year 1
18 Year 2
24 Year 3 
All staff have support and supervision monthly and peer support 6 weekly.  All staff
report back to the Board by way of quarterly reports on the targets set for them by
CEO. What we look for in staff below: Facilitator Responsibilities
Support excellence in facilitation through the preparation and delivery of high quality
parenting programmes and by supporting participant parents. Report directly to the
Senior Facilitator and work closely and supportively with Administrators and other
facilitators to deliver excellence in parent learning. 
• harness and build safety and trust within group settings;
• assess relevant individual learning styles and understand the theory and practice of
the group process;
• manage group dynamics;

Page 43

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
• observe equal opportunities and anti-discriminatory practice;
• use a range of facilitation skills;
• use reflective listening skills and acknowledge feelings;
• assess learning, develop and maintain ‘fit for purpose’ training materials;
• manage conflict and distress in a group;
• present the content of PNS course material across its portfolio of learning
materials;
• Report regularly to Senior Facilitator on delivery and potential new opportunities;
• Undertake and reflect in formal and informal evaluation, including self-evaluation.
• ensure up to date recording and processing of parent attendance, absence,
withdrawals, progress and results, and other relevant PNS processes;
• follow quality assurance processes to deliver outstanding learning to parents within
their communities;
•
Administrative Responsibilities
• To capture, maintain and analyse attendance, training and destination figures;
• Adhere to policies and timely submission of administrative paperwork;
• Work with wider team to revise, update and maintain resources appropriate for
training purposes.
Additional tasks Responsibilities
• Work in collaboration with the Senior Facilitator to plan and deliver top-up training
for pool of Facilitators, including logistics;
• Work with the Senior Facilitator to maintain a clear record of all expenditure in
relation to the Facilitators’ training programme and maintaining a high quality service;

Page 44

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
• Maintain knowledge of vital changes in legislation re. Child Protection, Health &
Safety, Equalities;
• Contribute on a regular basis to Parent Network Scotland’s Newsletter and
Facilitators’ Forum
Undertake any other appropriate duties as and when required by the Senior
Leadership team.
Person Specification
Skill Essential Desirable
Communication skills – oral and written 
Presentation skills - Experience of imparting information to a
wide range of people, such as parents, teachers, social
workers 
Leadership skills - PNS training emphasises parents taking
responsibility for their own learning. However, facilitators will
need to provide clear leadership to ensure that course
objectives are met 
Negotiation skills - These will be needed in a wide range of
circumstances, for example negotiating boundaries or
changes to the course delivery with parent, discussions with
professionals such as head teachers and colleges 
Assertiveness skills - Facilitators will need to demonstrate
their assertiveness in several ways, for example keeping
parents on track, challenging and caring for own needs

Page 45

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
Ability to take decisions - As much of the parenting training is
facilitated alone, the facilitator will need to be able to plan,
organise and work on own initiative 
Completed any Parent Network Scotland Course 
Open, Approachable, enthusiastic 
Ability to think on one’s feet whilst delivering materials
depending on needs of group 
Ability to provide parents with “hands on” activities for
strengthening their parenting skills
Knowledge of designing training courses and programmes
necessary to meet the training needs of parents ü
Knowledge of family engagement research and literature ü
Stay informed as to relevant skill and qualifications levels
required by facilitators for effective performance, and
circulate requirements and relevant information to the
organisation as appropriate 
Monitor and report on activities, costs, performance, etc as
required 
Prepare evaluation reports, case studies and media reports
for clients and stakeholders

Page 46

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) 99337 
Please give a breakdown of cost and recent quotations where appropriate. 
This is a new project and we have not drawn down any funding for this. 
However please see below our overall funding over the past 5 years. 
Total funds 
2019  - 257074
2020 -  228730
2021 -  329116
2022 -  370119
2023 -  368105

Page 47

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
At PNS we use the following evaluation and monitoring processes. 
Glasgow Kelvin College SCQF Accreditation
Verbal and written reflective evaluations 
Parenting Matters pre and post evaluation forms  
Strengths and Difficulties Questionnaire completed
SCQF Level 5 Supporting Family Relationships. 
Wellbeing Toolkit pre and post evaluations evidence an increase in the SHANARRI
Indicators Respected, Healthy and Nurtured.

Page 48

COMMUNITY INVESTMENT FUND 
THREE TOWNS LOCALITY PARTNERSHIP
The CIF will support proposals and projects that: 
• Connect with:
o the Community Planning Partnership (CPP) and Locality priorities; and 
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’. 
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval. 
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible: 
Denise Fraser
Locality Officer (Three Towns) 
Community Development Team
St John's Primary School
Morrison Avenue
Stevenston
KA20 4HH 
Email: denisefraser@north-ayrshire.gov.uk 
Mob: 07770 825129 
For more information see the guidance form here: https://northayrshire.community/wp-
content/uploads/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf

Page 49

COMMUNITY INVESTMENT FUND 
THREE TOWNS LOCALITY PARTNERSHIP 
1. Details of your organisation 
Name of Organisation 
Three Towns and District Community Shed 
Postal Address for Correspondence 
Name of Contact Person 
Scott Jamieson 
Position in Organisation 
Chairperson 
Telephone Number 
Email Address 
(A new community shed email address has still to be set up) 
Total amount of funding requested:  £56,850
Match funding (if any): N/A 
2. Brief description of your organisation 
We are a community organisation offering a safe place for all over 18’s to meet and
either partake in vocational activities of their choice or simply sit and make friends
over a cup of tea or coffee. Current activities include:- wood working, bicycle repairs,
3D printing, CNC wood cutting, model making, knitting/crochet group, music group
but we are open to new activities as dictated by our members. The men’s shed
joined forces with the recently started She shed to create the Community shed, open
to ALL over 18 years of age.

Page 50

COMMUNITY INVESTMENT FUND 
THREE TOWNS LOCALITY PARTNERSHIP 
3. Title and summary of proposal 
RE-PURPOSING OF NEW PREMISES IN HILL STREET
After 2.5 years in “temporary” premises that are way too small for us, that leak every
time it rains heavy and are in desperate need of updating to modern electrical and
functional standards we have finally found something eminently more suitable in Hill
Street, Ardrossan. These newer premises, however, require some upgrading in
terms of accessibility, female toilet provision, disabled toilet provision, insulation and
the creation of suitable administrative office space. Without these we will not be able
to appeal to those with mobility issues and more importantly we will not be able to
bring the She shed members from Glasgow Street due to a lack of toilet provision. It
will also be necessary to fit the new premises with a state of the art fire alarm
system. Where possible we would also like to add insulated plasterboard and
general insulation to allow us to keep the place warm whilst also minimising our
power bills as much as we possibly can. 
4. What difference will this project make within the locality and to local
services and programmes? 
Increasing the footprint of the Community shed, allowing us to consider additional
activities, in conjunction with ensuring ease of accessibility will allow us to remove
the “hold” we currently have on admitting new members. Currently our membership
is closed due to the premises simply being unable to accommodate any more
members. The men’s shed currently have 7-8 waiting to join. From the outset of the
She shed their trustees had interest from over 100, which bodes well for the future
size of our membership and therefore our community impact. But not only does it
bring more people it brings more people with new skills and talents that will,
hopefully, enhance the appeal of the Community shed to all. 
5. What engagement has taken place in relation to the project? 
With the above mentioned people waiting to join we have not been actively
promoting the shed as we should because we cannot accommodate new members
until we actually move to Hill Street. Our intention at the point of entry is to have a
“grand opening” where everyone will be welcome. This will kick start our plan to
recruit a minimum of 10% new members during the remainder of 2024 and an
additional 10% during each of 2025 & 2026. We will utilise all media outlets – the
Ardrossan & Saltcoats Herald, 3TFM radio to broadcast the open day, and we will
print flyers and ask shops/offices if they could display to let people know. We want
as many people as possible to attend this day and see exactly what we have to offer.

Page 51

COMMUNITY INVESTMENT FUND 
THREE TOWNS LOCALITY PARTNERSHIP 
6. How will the project be managed? 
The physical project of getting any work done will be manged by our Treasurer, not
only is he the person overseeing the groups funds and spending he is also a civil
engineer to trade (retired), with many site management roles to his name – an
excellent choice to ensure things remain on track and, more importantly, within
budget. As far as ongoing management is concerned we will tack the volume of
additional members from our grand opening as we go forward. This will allow us to
gauge whether we are on track to meet our new members target and if not will give
us an opportunity to increase the intensity of our messaging to the local community
to allow us to reach our target. 
7. Amount of funding being requested 
Amount of funding requested (£) £56,850 
Please give a breakdown of cost and recent quotations where appropriate. 
Item Cost  Quotation Supplied (Y/N)
Disabled Toilet Block/
General Toilet Block/
Sanitary Wear
£14,400 Y
Insulation
And Heating
£12,100 Y
Stair Lift £10,100 Y (More detail to follow)
Steel Stair Railing
Fabrication and Install
£1250 Y
Kitchen Appliance/ 
Fridge, microwave 
£500 Y
Fire Alarm System £4000 Y
Removal of existing toilets £7000 Y
Plumbers/ Electrician £5000 Y
Flooring £2,500 Y   
Please give a breakdown of details of match funding (if any) 
Funder Amount Funding Secured (Y/N)
Men’s Shed Contribution £16,000 to date Y
Howdens New Kitchen Y

Page 52

COMMUNITY INVESTMENT FUND 
THREE TOWNS LOCALITY PARTNERSHIP
Crown Decorating Centre Paint Discount Y
Neon Flooring Kitchen Flooring Y 
We are requesting £56,850. This is to fund an architect to draw up plans, build a
toilet block complete with toilet bowls, sinks, hand dryers and all plumbing, install a
fire alarm across the whole unit with smoke and heat detectors, install an accessible
lift, rip out the old toilets and create either usable administration space or usable
activities space, insulate as much as we can, particularly any outside walls, floor
coverings, some small kitchen units in our “social” space and all the necessary waste
disposal costs 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
As detailed in Item 6, we will monitor the success of any increase in membership
once we have moved to Hill Street in line with the targets we have set and will adjust
our public messaging should we feel it necessary. We will publish any increase in
membership in the minutes of our monthly trustees meeting (we agree to admit the
new members as part of this). This will allow reporting back to the locality partnership
as a member of N.A.C. connected communities regularly attends our Trustees
meetings. If the locality partnership would like to see some other method of reporting
this we will be happy to have a discussion on the best wat to achieve this.