NORTH AYRSHIRE COUNCIL 
27th August 2024   
Cabinet 
Title:    Year End Performance Reporting 2023-24 
Purpose:  To consider and approve the Council Plan Year End
Performance Reporting 
Recommendation:  Cabinet agrees: (i) To approve Our Council Plan Six
Monthly Progress Report attached at Appendix 1; (ii)
Approve the Council Plan Annual Performance Report as
set out in Appendix 2 (iii) Note the status of the council’s
performance within the LGBF Analysis of 2024 Data
Release at Appendix 3 and (iv) Refer this report to the
Audit and Scrutiny Committee for further consideration. 
1 Executive Summary 
1.1 Our Council Plan 2023-28 is the overarching strategy of our council and details
our council’s strategic priorities.  We have a statutory duty to publish information
that enables effective scrutiny of our performance.
1.2 This report combines three key Council Plan and corporate performance reports:
• Our Council Plan Six Monthly Progress Report (1st October to 31st March
2024)
• Our Annual Performance Report 2023/24
• The Local Government Benchmarking Framework (LGBF) - Analysis of April
2024 Data Release 
1.3 Following Cabinet approval, our corporate performance reports are published on
our website www.north-ayrshire.gov.uk/performance.
2 Background 
2.1 Under the Local Government (Scotland) Act 1992 and Local Government in
Scotland Act 2003 we have a duty to demonstrate Best Value.  To ensure we
support our residents, fulfil our statutory duties and invite scrutiny, we actively
manage performance and develop our reporting to make it accessible and
engaging.

Page 2

2.2 Our new Council Plan 2023-28 was approved by Council in June 2023.
2.3 Our Council Plan Six Monthly Progress Report (1st October to 31st March
2024) and accompanying appendices provide detailed information on the
progress made towards our strategic priorities.  The report includes key activities
and case studies from across our council in a magazine style format.  It provides
an overview of performance over the six months ending 31st March 2024 as well
as our next steps.
2.4 Our Annual Performance Report 2023/24 summarises our performance across
the full financial year. The Annual Performance Report is a high-level summary
with links to our more detailed six-monthly Council Plan Progress Reports to
avoid duplication.
2.5 The Local Government Benchmarking Framework (LGBF) Analysis of 2024
Data Release provides information on how we compare to similar councils.  The
LGBF is a national framework collating performance information from across all
32 local authorities and is specifically referenced within the Accounts
Commission Strategic Performance Information Direction. This report mainly
covers 2022/23 data as released during 2024, some information may relate to
more recent periods. Data is as downloaded in April 2024 unless otherwise
stated.
2.6 The Inclusive Growth Dashboard provides a contextual overview of North
Ayrshire, it is currently being reviewed and will be available in 2024/25 for use
within our reporting.  However contextual indicators as outlined in our Council
Plan Performance Management Framework are included in the report.
3 Assessment of Performance 
3.1 There are 47 actions within Our Council Plan, with one reported directly through
the HSCP and therefore excluded from this report.  One action “CP_29
Promoting new woodland creation and protecting our green spaces to provide a
natural resource for carbon sequestration” is slightly adrift of target (see 3.2
below for related performance indicator commentary), the remaining 45 actions
are all on target at Year End.
3.2 There are 26 performance indicators (PIs) within our framework.  At Year End
88.2% of indicators where data is known were either on or only slightly adrift of
target (17 indicators).  Two indicators were significantly adrift of target, these are:
• CP_29 Overall carbon emissions (tonnes) (Non-domestic Council estate)
For 2023/24, the total carbon emission figure is 20,745tCO2e against a target
of 19,500tCO2e.  However, this is a 0.72% reduction from 2022/23 emissions,
and 69.4% reduction from our 2005/06 baseline year.  When calculating our
council’s carbon emissions, we consider fossil fuel usage from employee
travel, fleet transport, waste, street lighting, KA Leisure buildings and our non-
domestic estate (including PPP schools).

Page 3

There is an increase in emissions associated with our non-domestic estate
when compared with the previous year, specifically caused by heating fuels. 
We will analyse our properties with excessive energy demand to determine
the best approach. 
Following increased capacity within the Sustainability Team, energy
management practices will be reinvigorated to scrutinise energy use, instil
behaviour change and deliver carbon reduction projects.  Behaviour change
will be encouraged through an employee energy awareness campaign which
includes utilising our Leadership Programme, other internal communication
channels and a new training module prior to the heating season beginning in
September.   
• CP_46 Number of trees planted under the North Ayrshire 2030 Tree
Planting Strategy
The total number of trees planted at the end of 2023/24 was 36,366, which is
slightly lower than the projected target of 40,000, however the total number of
trees planted within the first three years of the strategy is on track to achieve
the overall target of 108,000 trees to be planted by 2030, with six years of the
strategy remaining.  We have made a conscious decision to defer planting at
one of our larger key planting sites to allow for the regrading of soil from
another area of the same development site, which will reduce the associated
development costs to the council.  The planting at the site will commence after
the soil regrading works are complete. 
The level of response from the Woodland Grant Fund applications in 2023/24
was not as high as expected, so we will be looking to do more publicity
around the grant funding this year to hopefully improve the level of uptake in
the next round.  The 2024/25 Woodland Grant Fund will be opened and
widely advertised in the autumn, which will support local tree planting projects
including the creation of new community orchards.  The Streetscene Service
is also currently reviewing several potential planting sites for developing new
tree planting proposals for the 2024/25 tree planting season.
3.3 Overall the first year of Our Council Plan 2023-28 performance appears strong. 
Key highlights are detailed in the following section.
3.4 Within the LGBF Analysis of April 2024 Data Release the majority of PI data
relates to 2023/24.  The analysis focusses on 33 LGBF measures that directly
link to our priorities.  These include LGBF indicators included in our Council Plan
Performance Management Framework and additional indicators that relate to our
priorities.  It should be noted this April 2024 data release relates to a time period
prior to the current Council Plan, however the plan builds on progress made
during the previous Council Plan to drive immediate and longer-term sustainable
improvements for our residents.  As a result, the analysis of these PIs is still valid
for this time period.
3.5 Of the 33 LGBF priority indicators, 25 have data for 2022/23.  During 2022/23
eight priority PIs were within the top quartile (32%) and six were within the

Page 4

second quartile (24%).  Top quartile performance includes areas such as crisis
grant payments, proportion of pupils entering positive destinations, household
waste recycling and rent arrears.
3.6 68% of our LGBF priority indicators demonstrate improved performance in the
short term (one year comparison of 25 PIs with data) and 4% remain unchanged. 
For the same number of PIs over the medium term (three years), 60% have
improved and 4% remain unchanged.  Long term (10 years) 93.75% of indicators
have improved (based on 16 PIs with comparable data).
3.7 This LGBF analysis supports the Council Plan Progress Report findings that our
council performance against our priorities appears strong.  The information from
the LGBF is being used by teams to improve and maintain our performance.
3.8 Key Highlights
• We established a Financial Inclusion Partnership to increase access to
financial advice and support for our residents.  For example, our Debt Advice
service which commenced in summer 2023, has exceeded its referral target of
245 as at 31st March 2024.
• We are funding two additional School Welfare Rights Officers providing
financial advice and assistance to parents and carers.  This is based on strong
evidence, with our current School Welfare Rights Officer obtaining £560,509
for secondary school parents during 2023/24.  This is an average of £5,387
per referral.
• We agreed to provide a £50 clothing grant to all eligible three and four year
olds in Early Years during the 2024/25 school year to help with the cost of
living.
• We were awarded £79,181 to proactively support residents in accessing the
support they are eligible for following a successful grant application to the
Scottish Government Child Poverty Practice Accelerator Fund (CPAF).
• All eight mainland Secondary Schools now have access to mentoring services
following the successful recruitment of MCR Pathway Co-ordinators with
discussions in progress to deliver the service to Arran High School.
• Our council approved a definition to enable care experienced to be treated as
a protected characteristic within our Equality and Children’s Rights Impact
Assessments (ECRIAs).
• 378 empty homes have been brought back into use during 2023/24, this is
significantly above the annual target of 200. 
• 384 new building housing units are reaching completion, again significantly
above the annual target of 295.
• 2.05% of council budget is directed via participatory budgeting methods,
higher than our target of 1.5% and national target of 1%.
• Our Community Investment Fund has approved funding for 13 applications
over the year, totalling £721,912.
• To date, 53 council assets have been transferred to community management.
• Our Local Heat and Energy Efficiency Strategy (LHEES) and accompanying
Local Heat and Energy Efficiency Strategy - Delivery Plan were approved by
Cabinet on 23rd January 2024.

Page 5

• We launched a £350k Community Net Zero Carbon Fund, enabling local
community groups to bid for funding to help with feasibility and / or renewable
energy technologies on land or buildings they own.
• Our council's solar PV farm developments have progressed to construction
stage.  Both Nethermains and Shewalton site clearances have been
completed, with fencing being installed and consideration being given to
provision of mammal gates to support biodiversity on the sites.
• Our council continues to support wider action on climate change.  Four
community renewable projects have been awarded funding through the
Community Renewable Energy Generation Fund, totalling approx. £130,000.
• 2,015 households were assisted to furnish their homes in North Ayrshire due
to our bulky waste reuse partner Cunninghame Furniture Recycling Company
collecting and processing reusable items such as mattresses and furniture.
• 36,366 trees have been planted to date across North Ayrshire through various
projects and by community partners.
• 209 businesses were supported to reduce their environmental impact.
• Our Council Plan 2023-28 was approved by Council in June 2023.  Developed
with our communities, our Council Plan is our contract with our residents.
• Our first Best Value Thematic Audit on ‘Leadership of the Development of the
Council’s Strategic Priorities’ showed our council “continued to demonstrate a
strong culture of continuous improvement”.  Engagement with our
communities in jointly creating our Council Plan 2023-28 was also highlighted.
• As part of our ‘No Wrong Door’ approach, we have created a new streamlined
customer referral process. This new process will ensure that customers only
share their information with us once and are directed to the most appropriate
service provider (internal council services and external support services).
• Our council secured an award of £242,000 from the UK Government's
Department for Science, Innovation and Technology (DSIT) to advance
wireless infrastructure and 5G technology. We were one of six successful
local authorities and the only one in Scotland.
• Council approved a balance budget for 2024/25.
3.9 Key Next Steps
These next steps were as at 31st March 2024 and at time of writing these areas will be
progressing or may be complete.  Details of our performance will be included in our
Mid-Year report.
• We will progress our Single Shared Assessment approach which enables
consent to be obtained from our residents which will allow us to actively assess
the support available.
• We will publish our British Sign Language Plan.
• We will refresh our strategic approach to tackling poverty through the work of
our Child Poverty and Cost of Living Board.
• We will develop a Pathfinder project with the Scottish Government which will
focus on a place based, person centred approach to tackling child poverty.

Page 6

• We will continue making our play areas more accessible and inclusive by
extending regeneration works to 15 additional sites.
• We will work with our third sector and other partners to ensure our Participation
Strategy meets the needs of our communities.
• We will continue to develop our locality planning model as the central way for
residents to be involved in local decision-making including working with
communities to develop their six locality action plans for 2024/25.
• We will continue to work with communities to co-design and deliver our
participatory budgeting processes.
• We will develop streamlined ways for communities to find information about
support, including funding available for our residents.
• We will continue to provide support for communities interested in making
greater use of council assets, including through the Community Asset Transfer
process, and use feedback to make processes as easy as possible for our
residents.
• We will undertake additional awareness raising activity to increase the uptake
of the Community Renewable Energy Generation Fund.
• We will continue to work with Keep Scotland Beautiful, to support free energy
resources for Secondary Schools.
• We will implement our Local Transport and Active Travel Strategy.
• We will continue to review the current bulky uplift service to align with the new
SEPA guidance.
• We aim to complete the construction of our Fairlie Coastal Path.
• We will continue to embed and evolve our Workforce Planning approach
meetings.
• We will continue to support the Audit Scotland Best Value Thematic Work.
• We will launch a project to develop and improve the quality of Children's Rights
Impact Assessments.
• Awards will be made under the Communities and Place Fund.
• The Participatory Budgeting funding through UKSPF Communities and Place
Fund will take place later in 2024, with a budget of £31,000 available.
4 Proposals
4.1 Cabinet agrees: (i) To approve Our Council Plan Six Monthly Progress Report
attached at Appendix 1; (ii) Approve the Council Plan Annual Performance
Report as set out in Appendix 2 (iii) Note the status of the council’s performance
within the LGBF Analysis of 2024 Data Release at Appendix 3 and (iv) Refer this
report to the Audit and Scrutiny Committee for further consideration. 
5 Implications/Socio-economic Duty
Financial
5.1  There are no financial implications arising from this report.

Page 7

Human Resources
5.2 There are no human resource implications arising from this report.
Legal
5.3 There are no legal implications arising from this report.
Equality/Socio-economic
5.4 There are no equality/socio-economic implications arising from this report.
Climate Change and Carbon
5.5 There are no climate change and carbon implications arising from this report.
Key Priorities
5.6 The Year End Progress Reports enable the effective scrutiny of the delivery of
our Council Plan strategic priorities.
Community Wealth Building
5.7 There are no Community Wealth Building implications arising from this report.
Consultation
5.8 The Executive Leadership Team (ELT) reviewed and scrutinised the report prior
to submission to Cabinet. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Hardy, Senior Manager (Policy,
Performance and Democracy), on 01294 324035 or email IslaHardy@north-
ayrshire.gov.uk.

Page 8

Our Council Plan 
Six Monthly Progress Report
1 October to 31 March 2024
Appendix 1

Page 9

Contents
Our Performance at a Glance ................................................................................................. 1
Welcome ................................................................................................................................. 2
Our Priori�es .......................................................................................................................... 3
Wellbeing ................................................................................................................................ 4
Key Ac�vi�es ....................................................................................................................... 4
Next Steps ........................................................................................................................... 9
Case Study – Welfare Rights Officers ................................................................................ 10
Communi�es and Local Democracy ..................................................................................... 11
Key Ac�vi�es ..................................................................................................................... 11
Next Steps ......................................................................................................................... 12
Case Study – Over 50’s Ac�vity Group.............................................................................. 13
Climate Change..................................................................................................................... 14
Key Ac�vi�es ..................................................................................................................... 14
A Sustainable Council ........................................................................................................... 20
Key Ac�vi�es ..................................................................................................................... 20
Next Steps ......................................................................................................................... 23
Case Study – No Wrong Door ........................................................................................... 24
Audits, Inspec�ons and Accredita�ons ................................................................................ 25
Performance Summary ......................................................................................................... 28
Measures Adri� of Target ................................................................................................. 28
Ac�ons Adri� of Target ..................................................................................................... 30
Indicator Amendments and Recommenda�ons ............................................................... 30
Performance Indicators .................................................................................................... 31
Ac�on Tracker ................................................................................................................... 34

Page 10

Our Council Plan Progress Update – Year End 2023-24 Page 1 of 39
Our Performance at a Glance
248 adults engaged
with our Multiply
Projects between
January and March
£160k awarded to
nine projects under
the Communities and
Place Fund
£108,086 awarded to
local community
groups through our
Community
Investment Fund
245 referrals to our
new Debt Advice
Service exceeding the
expected target as at
31st March 2024
£130,000 funding
awarded to four
community renewable
projects through the
Community
Renewable Energy
Generation Fund
Local Heat and
Energy Efficiency
Strategy (LHEES)
approved by Cabinet
in January 2024
209 local businesses
supported to help
reduce their
environmental
impact
52 climate change
and energy lessons
delivered to 22
primary schools
36,366 trees have
been planted as part
of our 2030
Woodland: A Tree
Planting Strategy
2,015 households
assisted to furnish
their homes via our
bulky waste recycling
partner
£79,181 funding
secured from Scottish
Government Child
Poverty Accelerator
Fund
£560,509 in financial
gains delivered to
parents through our
School Welfare Rights
Officer (over £1.6m since
the project began)

Page 11

Our Council Plan Progress Update – Year End 2023-24 Page 2 of 39
Welcome
Welcome to our Six Monthly Progress Report on Our Council Plan 2023-28.  This report covers
the period 1 October to 31 March 2024.  We view Our Council Plan as our contract with our
communi�es, ‘our’ plan.  It is an ac�ve commitment to support our residents and deliver on
our joint priori�es.  Our four priori�es are Wellbeing, Communi�es and Local Democracy,
Climate Change and A Sustainable Council.  
Overall, our delivery of our Council Plan is making good progress.  At year end 88.2% of our
indicators with data and 100% of our ac�ons are either on target or only slightly adri�.  We
benchmark with other local authori�es through the Local Government Benchmarking
Framework (LGBF).  This is detailed in our annual LGBF Report.
The cost of living crisis con�nues to impact the lives of our residents and communi�es as we
strive to find ways to support those who are most vulnerable.  For example, we have been
working towards the extension of free school meals provision to ensure children have access
to healthy and regular meals.  We are addressing inequali�es within our communi�es that can
heighten the impact felt by the cost of living crisis by ensuring our young people have access
to appropriate support such as the MCR mentoring programme and advice services when
seeking further educa�on.  Our School Welfare Rights Officer has successfully supported
families to access £560,509 of financial support during 2023/24, with over £1.6m since the
project began.
We con�nue to build on strong exis�ng rela�onships with our communi�es and partners by
developing online resources that provide informa�on on what support is available for our
residents.  If you are in need of cost of living support please visit www.north-ayrshire.gov.uk
or call 01294 310000.   
In order to address the ongoing climate crisis we have planted 36,366 trees through various
projects and with community partners we con�nue to educate our young people on the
impact of climate change and what they and their communi�es can do to help.  We have
con�nued our extensive recycling and reuse programme with items such as old matresses
and furniture being collected and prepared for poten�al future use.  
Everything we do is achieved in the context of our environment.  Moving forward we will
demonstrate this through our ‘Inclusive Growth Dashboard’ which gives an overview of the
status of North Ayrshire and is currently under review.  Our key contextual indicators are
shown below:
Population of North
Ayrshire:
133,490 (June 2022)
29.2% of our children live
in poverty after housing
costs (2022/23)
28% of our households live
in fuel poverty (2021/22)
70.3% of working age
population are in
employment
(December 2023)
10.4% of people earn less
than the living wage
(2023)
Area wide CO2 emissions
are 682kt CO2 (July 2023)
Employee Headcount
7,690
(March 2024)
Number of Full Time
Equivalent Employees
6,561
(March 2024)

Page 12

Our Council Plan Progress Update – Year End 2023-24  Page 3 of 39
Our Priori�es 
Our Vision – A North Ayrshire that is fair for all. 
Our Mission – Working together to improve the
lives of our people in North Ayrshire.

Page 13

Our Council Plan Progress Update – Year End 2023-24  Page 4 of 39
Wellbeing
Key Ac�vi�es
Cost of Living
As part of our budget discussions, our
Council approved £160,000 to fund two
addi�onal Welfare Rights Officers for two
years.  These Welfare Rights Officers will
be based in schools and provide financial
advice and assistance to parents and
carers.  Results from our current School
Welfare Rights Officer show an impact is
being made.  106 referrals to our Money
Maters team have resulted in:
• £560,509 in financial gains for
secondary school parents during
2023/24.  An average of £5,387 per
referral.
• £1,067,328 gained by secondary
school parents since the project
began.
The Child Poverty and Cost of Living Board
were successful in obtaining a grant from
the Scottish Government’s Child Poverty
Practice Accelerator Fund (CPAF). 
£79,181 was awarded to the council to
assist with the development of a
streamlined process for residents to
access support.  The process will route the
person to the appropriate service or team
to gain access to all entitlements and
support(s).  
We met with parents of our young people
accessing free school meals and clothing
grants.  The outcome of the discussions
will inform the redesign process of
accessing these benefits.  This forms part
of our No Wrong Door approach and aims
to get consent from parents to automate
the availability of these essential services
in the future.
In March 2024, Cabinet approved the
extension of our free school meals
programme.  This will provide a healthy
mid-morning snack for all primary school
children and ensure availability of ambient
food on a temporary basis during
2024/25.  This covers the period up to the
next phase of the na�onal expansion of
free school meals to those pupils in P6 and
P7 who are eligible for the Sco�sh Child
Payment (expected in February 2025). 
The Sco�sh Government’s most recent
Programme for Government stated that
na�onal universal expansion would then
follow during 2026.  
This approval also saw the extension of
the Winter Warmer Breakfast ini�a�ve
that provides breakfasts to all secondary
school pupils.  This will be available again
between November 2024 and March
2025.  
To further help with the cost of living
crisis, we will provide a £50 clothing grant
to all eligible three and four year-olds in
Early Years during the 2024/25 School
Year.
Financial Inclusion
Our North Ayrshire Financial Inclusion
Strategy is being implemented and is on
target.  The North Ayrshire Financial
Inclusion Partnership includes
representa�on from financial inclusions
service providers and key stakeholders
such as advice services, 1st
Alliance Community
Bank, fuel poverty
advice services,
employability,
educa�on and
housing services,

Page 14

Our Council Plan Progress Update – Year End 2023-24  Page 5 of 39
housing associa�ons, community link
workers, the food bank and the Alcohol
and Drugs Partnership.  It was established
in 2023 with an aim to improve referral
pathways and promo�on of services for
our residents.  
For example, our Debt Advice service
which commenced in summer 2023, has
exceeded its referral target of 245 as at
31st March 2024.  Later this year a review
of our Debt Advice service provision will
be undertaken to inform decision making
for the longer term.
We remain commited to ensuring advice
services are available in communi�es
through GP surgeries, schools, foodbanks
and local housing offices.  We are also
expanding our services within Educa�on
to include primary schools and early years. 
To ensure people get access to the
services they require we have established
referral pathways between our Welfare
Rights and Debt Advice Services and a
range other services such as Housing and
Employability.
A communica�ons plan for our Financial
Inclusion Partnership will be developed
later in 2024.  
Our Community Banking Hub in Kilwinning
has been opera�onal from 4th March
2024 and has been well-received by the
local community, with 199 contacts
including transac�ons from our residents
and local businesses.  Our Banking Hub
provides residents and businesses with
access to cash, banking facili�es and in
person services.  This is vital for those who
rely on face-to-face banking.  A review will
take place in May 2024 regarding
extending the opening hours.
Through the Whole Family Wellbeing
Fund, third sector organisa�ons have been
engaged in the transforma�onal ac�vity
required to support holis�c family
support, shi� focus to early interven�on
and preven�on and work towards the
aspira�ons of The Promise.  More info can
be found in our North Ayrshire Children's
Services Performance Update 2023-24
Tackling Inequali�es
We have con�nued to work with partners,
including the lead organisa�on KA Leisure,
to develop our Wellbeing Alliance as we
work together to ensure everyone is given
an opportunity to enjoy life and cope with
challenges.  A successful pilot working
with young people in the Garnock Valley
area has helped shape thinking around
how the Alliance operates to promote
equality and reduce health inequali�es.  
Our council approved a defini�on for Care
Experienced to be treated as a protected
characteris�c within our Equality and
Children’s Rights Impact Assessments
(ECRIAs).  These new assessments were
used immediately for our council budget
discussions in February to ensure the
poten�al impact of any decisions rela�ng
to our care experienced young people
were considered in full.
We have recruited addi�onal MCR
Pathways Coordinators to ensure mentors
are available for our young people who
may benefit from this extra support.  Our
young people con�nue to rate the
programme highly and reports suggest the
interven�on of an MCR Mentor is having a
posi�ve impact on atainment.  Our young
people have requested
access to their mentor
over the school
holidays and
discussions are
progressing to

Page 15

Our Council Plan Progress Update – Year End 2023-24  Page 6 of 39
ensure consistency of this support across
North Ayrshire.  Addi�onal mentor
recruitment campaigns are planned over
the coming months.
Work has commenced on u�lising the
“One Good Adult” role profile.  This profile
focusses on providing kind and reliable
rela�onships with “One Good Adult”
offering support and mentoring to the
young person.  This work began a�er
young people indicated that improved
rela�onships support their learning.
To ensure sustained posi�ve des�na�ons
for our young people leaving school, work
is underway with our partners in Ayrshire
College to iden�fy those who are planning
early entry to further educa�on.  This will
allow more targeted transi�on mee�ngs
to take place and ensure young people
have applied for a course which aligns well
with their needs and aspira�ons.
Our young parents’ group was launched in
January 2024 and has seen 15 young
parents regularly engage in weekly
ac�vi�es.  This group has been developed
by and for young parents under the age of
25 to increase their confidence and
support improvement in the physical,
mental, emo�onal and rela�onal
wellbeing of them and their children.
On 23rd February 2024, at Ardeer
Community Centre, we welcomed 70
young people from across secondary
schools in North Ayrshire to take part in
the first Alcohol and Drug Partnership
(ADP) Young Person’s event.  The event’s
aim was to engage with our young people
and listen to their experience of alcohol
and drugs educa�on and how it can be
improved.  The event was facilitated by
mul�-agency partners and included
speakers with lived experience as well as
ac�ve workshops to develop knowledge
and capture views.
Our New Scots community recently
worked with other crea�ve young people
from across North Ayrshire to produce a
short film.  The film follows the character
Stephen (played by Ukrainian, Oleksandr)
as he makes his way to a university open
day and demonstrates the various issues
that are commonly experienced by New
Scots.  The project was a collabora�on
between North Ayrshire Council, The
Ayrshire Community Trust and Vertex
Visions and was filmed in parts of North
Ayrshire and other loca�ons in Scotland. 
The film was premiered at an event in
January.  You can view the  “Different
Ways” short film together with a behind
the scenes stye short documentary ‘The
Making of Different Ways’.  
The Litle Free Library was launched at
Lochshore Park, with environmental-
themed books for children, young people
and adults to use on site or borrow as part
of the Out and About project in the
Garnock Valley.  As part of this project,
families iden�fied by our Family Care
Workers have also benefited from KA
Leisure memberships being provided and
taking part in events to support them get
ac�ve.  This includes being gi�ed
experience kits which include a range of
items and ac�vity ideas for families to
enjoy both indoors and outdoors.
A pan Ayrshire Bri�sh Sign Language (BSL)
plan is currently being finalised alongside
East and South Ayrshire
Councils, East, South and
North Ayrshire Health
and Social Care
Partnerships, NHS
Ayrshire and Arran
and Ayrshire

Page 16

Our Council Plan Progress Update – Year End 2023-24  Page 7 of 39
College.  This plan will ensure that people
whose first or preferred language is BSL
will be fully involved in daily and public
life, as ac�ve, healthy residents and will be
able to make informed choices about
every aspect of their lives.  
Life Long Learning Opportuni�es
The Discovery Award, which is delivered in
Irvine, Kilwinning, Garnock Valley and
Three Towns locali�es as well as with a
New Scots group, has seen almost 60
adults par�cipate in bronze and silver
award ac�vi�es.  The Discovery Award is
aimed at people over 50 years of age, to
help promote an ac�ve and healthy
lifestyle by offering challenges to both
s�mulate and mo�vate.
Our Mul�ply Projects have engaged with
248 adults between January and March. 
These projects provide numeracy support
in the community including a partnership
with Ayrshire College, and University of
Highlands and Islands for Arran residents,
allowing us to provide access to
accredita�on.
Housing
Our council recognises that access to good
quality affordable housing and outdoor
green space is a key asset in addressing
child poverty, and poverty overall and has
a posi�ve and las�ng impact on public
health.  All new build council family homes
being built as part of our Strategic Housing
Investment Plan (SHIP) have study space
and private gardens built into their design.
Despite the affordability challenges being
faced, 136 new homes were delivered by
our council and our partner Registered
Social Landlords (RSLs) during 2023/24. 
Our council delivery included 36 homes at
Harbourside in Irvine; 6 amenity
bungalows at A�on Court in Stevenston;
and 12 amenity flats at the former police
sta�on in Largs.  Riverside completed 31
homes at Tarryholme in Irvine. 
Cunninghame Housing Associa�on
delivered 27 homes at West Byrehill in
Kilwinning and 24 amenity flats in Green
Street, Saltcoats. 
Our council bought five proper�es during
2023/24 and have increased our
programme to purchase 15 proper�es
during 2024/25.  We also acquired 33 new
homes across five locali�es between 1
October 2023 and 31 March 2024 to
support Ukrainian displaced households.
There were no new build comple�ons by
our council or our Registered Social
Landlord (RSL) partners from 1 October
2023 to 31 March 2024. We are con�nuing
to build new homes throughout North
Ayrshire to address current demand for
housing and a summary of new build site
starts and ongoing development projects
for the six months ending 31st March are
noted below:  
Arran
Trust Housing Associa�on acquired two
second-hand market homes on Arran for
RSL rent. Construc�on work con�nues at
Arran Development Trust’s Rowarden site,
which is supported by the Sco�sh
Government’s Rural and Islands Housing
fund, providing 18 homes for private rent.
Garnock Valley
During January 2024 works commenced
on site to deliver seven council homes at
Laburnum Avenue, Beith and a further
seven council homes at
Newhouse Drive in
Kilbirnie. Both
development sites
formed part of our
council’s Estate

Page 17

Our Council Plan Progress Update – Year End 2023-24 Page 8 of 39
Based Regenera�on Programme. Low
demand flated accommoda�on was
regenerated and will be replaced with
general needs houses and amenity
bungalows.
Irvine
Works commenced on the site of the
former Stanecastle School in Irvine during
March 2024. The site will deliver 31 units
(29 homes) for council rent.
Kilwinning
There were no new site starts or
comple�ons in Kilwinning from 1 October
2023 to 31 March 2024.
North Coast
The site of the former St Mary’s primary
school in Largs is being redeveloped to
provide 26 new homes for council rent.
Works commenced on site during January
2024.
Three Towns
Works commenced on site at the former
James McFarlane school in Ardrossan
during March 2024. The site will provide
19 homes for council rent. Work con�nues
at Cunninghame Housing Associa�on’s 20
unit Garven Road, Stevenston site. The
works commenced during September
2023 and are an�cipated to complete
during late 2024.
Community Wealth Building
Our refreshed Community Wealth Building
(CWB) Strategy, approved by Cabinet in
February, aims to work towards achieving
a wellbeing economy for North Ayrshire. 
We will progress the delivery of the
ac�ons in the refreshed strategy which
includes commissioning research into
op�ons for delivering a locality-based
approach.
We have a lead role in delivering the
Ayrshire Regional Economic Strategy. 
While all Ayrshire Regional Economic
Strategy themes aim to develop
infrastructure to support business growth,
North Ayrshire Council also has the lead
on the “Support for Enterprise” theme.  
This focusses on crea�ng a region where
businesses can grow and
entrepreneurship and crea�vity can
flourish.  The development of a Regional
Economic Strategy website is underway to
support this theme.  Our Business Support
team has concluded a series of mini
enquiries with local businesses to help
develop the website which will host
informa�on on support available.
We have made an investment of £300,000
in developing our approach to CWB with
our communi�es.  This will allow us to
work with third sector and community
partners to support new and innova�ve
ownership models and income genera�on
ideas that bring money into and keep it
within our communi�es.
Commercial Estate Developments
Our new business pavilion within
Annickbank Innova�on Campus in Irvine is
now complete.  The building is low carbon
and energy efficient with an Energy
Performance Cer�ficate (EPC) ra�ng of A+. 
It is hoped that the pavilion will support
the growth of local businesses.  As part of
our provisional award for the Levelling Up
for Ayrshire: Commercial and Low Carbon
Infrastructure project, we have appointed
a design team to prepare
designs for new
industrial space on the
site.
Phase Two of our
commercial space

Page 18

Our Council Plan Progress Update – Year End 2023-24  Page 9 of 39
development on Kyle Road is currently
awai�ng the confirma�on of funding,
following which a tender will be issued.  
Public Spaces
Our Streetscene service is responsible for
ensuring the places we live, work and visit
are well maintained and accessible.  To
support this the service has con�nued the
roll out of street assets such as bins, seats
and wheelchair-accessible picnic benches. 
For example, 25 new seats and benches
have been installed in parts of Eglinton
Country Park.  Our Street Cleanliness
Score has also showed a significant
improvement this year rising from 84.6%
to 89.1%.
Our employees are using digital
technology to streamline the recording
and repor�ng of assets that require
maintenance, allowing a quicker response
which provides a beter experience for our
residents.  We have also begun the
regenera�on of all of our 95 play facili�es.  
We have improved bus stop infrastructure
across North Ayrshire through the
£146,000 capital award under the
Community Bus Fund.  The fund aims to
enable local transport authori�es to
improve local public transport, with a
focus on rural areas of depriva�on where
lower popula�on density means bus
services can be less commercially viable. 
These were delivered alongside the bus
corridor improvements funded under
SPT’s Capital Programme.
We have implemented the Regenera�on
Delivery Plan Ac�on programme for
2023/24.  This has been supported by over
£4m funding under the Place Based
Investment Programme, Cycling Walking
and Safer Routes, Vacant and Derelict
Land Fund and SPT’s Capital Programme.  
We have con�nued work on our
Community Transport study establishing
where community transport is in demand
and types of community transport within
North Ayrshire.  From this, public and
stakeholder consulta�on exercises are
underway to help iden�fy the level of
need for community transport across the
area.  
Next Steps
• We will progress our Single Shared
Assessment approach which enables
consent to be obtained from our
residents which will allow us to
ac�vely assess the support available.  
• We will con�nue to deliver our
Mul�ply Projects providing numeracy
support in the community including
access to accredita�on.  
• We will publish our Bri�sh Sign
Language Plan.
• We will refresh our strategic approach
to tackling poverty through the work
of our Child Poverty and Cost of Living
Board 
• We will develop a Pathfinder project
with the Sco�sh Government which
will focus on a place based, person
centred approach to tackling child
poverty.
• We will con�nue making our play
areas more accessible and inclusive by
extending regenera�on works to 15
addi�onal sites.  
• We will undertake a review of our
Debt Advice service.

Page 19

Council Plan Progress Update – Mid Year 2023-24  Page 10 of 39
Case Study – Welfare Rights Officers
School Welfare Rights Officers provide confiden�al advice and assistance to parents and
carers to enable them to access all benefits they are en�tled to.  They also offer advice when
circumstances change, provide support to challenge any sanc�ons and offer representa�on
at appeals.  Through being based in schools it is hoped any s�gma is lessened and parents
and carers feel more confident in approaching officers for assistance as it is a trusted space.  
Key results from our current School Welfare Rights Officer show an impact is being made. 
From 106 referrals to our Money Maters team:
• £560,509 in financial gains for secondary school parents during 2023/24.  An average
of £5,387 per referral.
• £1,067,328 gained by secondary school parents since the project began.
In addi�on to schools, we partner with the Food Bank and have a Welfare Rights Officer
funded by the Trussell Trust taking referrals from all Food Banks and holding drop-in
surgeries as required.  We also have advisers in GP surgeries, Addic�on Services, Jus�ce
Service and Children and Families Teams and get regular referrals to our services such as
Financial Inclusion.
Next Steps
As at 2023/24 we have one Welfare Rights Officer based in our Secondary schools, with
funding met by the Educa�on Service and the Financial Inclusion Partnership.  In February as
part of the budget discussions, Council agreed to fund £160k for School Welfare Rights
Officers.  
The agreed funding will enable recruitment of an addi�onal two Welfare Rights Officers for
two years, extending the current programme to March 2025.  It is intended that the school
clusters will be placed into three sec�ons with one Welfare Rights Officer in each.  This will
keep the links between Early Years, Primary and Secondary, meaning that if a family has
children of various ages, the family is s�ll supported by the same officer.  
Performance management of the School Welfare Rights Officers emphasises wellbeing as
well as financial improvement.  As a result, case studies will be used to manage performance
in addi�on to quan�ta�ve informa�on.  Baselines will be taken to be able to show
improvement.  
With the addi�onal funding
we aim to replicate this
across our schools.  All three
School Welfare Officers will
be in posi�on a�er the
summer to help support our
families during the 2024/25
academic year.
I just wanted to drop a wee email to say thank you so much for
all the assistance in finding what we were en�tled to...  …The
gain isn't just about finances (which is a wonderful help and a
huge weight off my mind) ….  [I] no longer stress and panic over
trying to cover school holidays, sick days etc.  I am much happier
and less stressed as I'm here fully for all three children now
which has made the kids all feel happier.  
The service you offer is wonderful and I'm very grateful to have
been offered your assistance.

Page 20

Our Council Plan Progress Update – Year End 2023-24 Page 11 of 39
Communi�es and
Local Democracy
Key Ac�vi�es
Community Planning Partnership
Our Community and Locality Planning
Conference was held in February 2024 and
was supported by representa�ves from
Sco�sh Government who are leading on
Democracy Maters 2.  Democracy Maters
2 is part of the Local Governance Review
which looks at how power, responsibility
and resources are shared with local
government and different communi�es in
Scotland.  It was the main theme for the
Conference.  Over 60 delegates were in
atendance from partner agencies, third
sector organisa�ons, council services and
community members.  
February also saw the launch of the
Community Directory tool  together with
the new Community Planning website. 
Our Community Directory tool allows
residents to find services, groups and
ac�vi�es for health and wellbeing across
Scotland.  Our new Community Planning
website provides all the important
informa�on about our Community
Planning Partnership including community
empowerment, advice on the Cost of
Living crisis and community engagement. 
The Community Planning X account
(formally called Twiter) con�nues to grow
with over 860 followers and over 7,500
impressions since late 2023.
The first of two planned Community and
Locality Planning training sessions took
place online in March 2024 with 16
par�cipants in atendance including
community members, partner
organisa�ons and internal colleagues.  The
next session is scheduled to take place in
November 2024. 
We con�nue to offer training and
outreach sessions regularly to third sector
and voluntary colleagues through the
Community Engagement Network and
atendance at Community Planning
training.  Links will be further
strengthened through development of the
Par�cipa�on Strategy and new
Community Planning Partnership website
and Community Directory.  We will be
engaging with our Third Sector Interface
colleagues at The Ayrshire Community
Trust and Arran CVS to support and
finalise the new strategy so we can be
certain it meets the needs of our council
and our partners.
We engaged with our Joint Youth Forum
and Youth Council around our Community
Plan (our Local Outcomes Improvement
Plan (LOIP)).  These results will be used to
inform our inclusive approach with young
people throughout the lifespan of the
Community Plan.
Community Grant Funding
Our commitment to Community
Investment Funding has supported three
successful grant applica�ons approved by
Locality Partnerships and Cabinet resul�ng
in a total of £108,086 being awarded to
local community organisa�ons.  Our
Communi�es and Place Fund as part of
our Shared Prosperity Fund Investment
Plan has provided £160,000 of
funding to nine
community projects.

Page 21

Our Council Plan Progress Update – Year End 2023-24 Page 12 of 39
Islands 
On Arran, we con�nue to support the
three theme groups that feed into the
Island Plan Delivery Group.  This has
involved taking forward the findings of the
North Ayrshire Island Skills Ini�a�ve to
support and fund an Arran Skills
Coordinator which will support individuals
to remain on Arran.  This is a direct result
of responding to needs iden�fied by
research into island challenges through
lived experience.  
On Cumbrae, we have con�nued to
support the Carbon Neutral Islands
programme which, over the year to March
2024, has advanced key energy projects to
reduce greenhouse gas emissions and
tackle fuel poverty, again demonstrated
through lived experiences.  Over £0.95m
of funding was secured through the
Sco�sh Government’s Islands Programme
to support community led regenera�on
projects at Dyemill Bike Park, Lamlash and
Garrison House, Millport.  
Next Steps
• We will work with our third sector and
other partners to ensure our
Par�cipa�on Strategy meets the needs
of our communi�es.
• We will con�nue to develop our
locality planning model as the central
way for residents to be involved in
local decision-making including
working with communi�es to develop
their six locality ac�on plans for
2024/25.
• We will con�nue to work with
communi�es to co-design and deliver
our par�cipatory budge�ng processes.
• We will develop streamlined ways for
communi�es to find informa�on about
support, including funding available to
them.
• We will con�nue to provide support
for communi�es interested in making
greater use of council assets, including
through the Community Asset Transfer
process, and use feedback to make
processes as easy as possible for our
residents.

Page 22

Our Council Plan Progress Update – Mid Year 2023-24 Page 13 of 39
Case Study – Over 50’s Ac�vity Group
Social isola�on within the older community in North Ayrshire increased drama�cally during
the Covid-19 Pandemic and remains a significant challenge.  Our Discovery Group has been
successful in addressing the needs of those aged over 50 years within the Irvine Locality.  
The Irvine Library Ac�vity Group was created to address the social and wellbeing needs of
the over 50’s demographic within the Irvine Locality.  The aims and objec�ves of the Over
50’s Library Ac�vity Group are to:
• Provide peer support and reduce social isola�on in the over 50 age group in the Irvine
Locality.
• Provide par�cipants with the opportunity to try a wide variety of new ac�vi�es, which
will be guided by the needs and interests of the group members.
• To improve the health and wellbeing of par�cipants by providing them with the
opportunity to meet new people, share skills and experiences and try new ac�vi�es.
• Provide a forum for informal informa�on sharing and signpos�ng for par�cipants to
access a variety of opportuni�es within the wider community.
The group was adver�sed throughout the Irvine Locality via social media, local shops/venues
and through posters, leaflets and conversa�ons with regular customers.  Weekly sessions of
the Over 50’s Ac�vity Group are planned and developed in partnership with the par�cipants. 
A vital part of every weekly session is the �me built in for the par�cipants to connect and
build rela�onships through an informal coffee and chat.  Weekly sessions also provide
opportuni�es for par�cipants to try new ac�vi�es, share hobbies and interests, work with
partner agencies and explore opportuni�es in the wider community.
At the beginning of the group participants highlighted the various reasons why individuals
chose to join: 
• ‘To help my mental health and find new friends.’
• ‘To keep active, to meet new people and have fun.’
• ‘I have a lot of health problems and I want to meet new people and get help with my
computer.’
Over the past few months, the group has been involved in a wide variety of activities
including: 
• Tai Chi Taster.
• Police and Trading Standards Talk and Information sharing.
• Board games afternoon.
• Group members sharing hobbies and interests.
• Halloween quiz and activities.
• Murder Mystery afternoon.
• Computer class with Input.
• Calligraphy taster session.

Page 23

Our Council Plan Progress Update – Year End 2023-24 Page 14 of 39
Climate Change
Key Ac�vi�es
Energy
The Local Heat and Energy Efficiency
Strategy (LHEES) was approved by Cabinet
on 23rd January 2024 and has been
published alongside the Local Heat and
Energy Efficiency Strategy - Delivery Plan. 
As well as the forthcoming Pan Ayrshire
Energy Masterplan, the crea�on of our
Local Heat and Energy Efficiency Strategy
is an example of work that has been
undertaken to beter understand the
current energy use status and
opportuni�es for ac�on.  A revised
Renewable Energy Strategy in 2024 and
building asset decarbonisa�on model will
provide further opportunities to support
decision making for future actions.
Our Council's solar PV farm developments
have progressed to construction stage. 
Both Nethermains and Shewalton site
clearances have been completed, with
fencing being installed and consideration
given to provision of mammal gates to
support biodiversity on the sites.  We are
developing a battery storage pilot scheme
to maximise the use of existing roof
mounted solar PV on non-domestic
buildings to support local energy
networks.
A feasibility study for wind and solar on
the i3 site in Irvine has been completed
and further works are being undertaken
to understand the options available for
low carbon energy generation schemes
for the site.
Our council continues to support wider
action on climate change beyond our own
estate.  Four community renewable
projects have been awarded funding
through the Community Renewable
Energy Generation Fund, totalling
approximately £130,000.  Additional
awareness raising activity is underway to
increase the uptake of the available
funding.
Our Sustainability Team has delivered 52
climate change and energy lessons to 22
primary schools to date, with 10 schools
visited between January and March 2024. 
The lessons support awareness of action
on climate change and encourage action
within schools through their climate
action plans.  A further 12 schools have
signed up for lessons in the new term. 
We continue to work with Keep Scotland
Beautiful to support free energy resources
for Secondary Schools and are developing
a community carbon literacy training pack
for smaller community groups.
Our Business Development team has
supported 209 businesses to help reduce
their environmental impact.  A large focus
of this work has been through
collaboration and delivery of support
including Net Zero Accelerator
programmes and financial aid to adopt
new technology.
Biodiversity
36,366 trees have been planted to date
across North Ayrshire through various
projects and by community partners.  Our
2030 Woodland: A Tree Plan�ng Strategy
con�nues to be a key driver, with support
being provided to local community groups
and the assessment of suitable plan�ng
sites con�nuing.  A working group has
been established to create a new ‘Tree
Plan�ng Webapp’ – a GIS
system that overlays
various relevant layers
to help iden�fy
poten�al sites for
tree plan�ng.

Page 24

Our Council Plan Progress Update – Year End 2023-24  Page 15 of 39
All applica�ons submited to the council's
Woodland Grant Fund (2023/24 season)
were assessed in early 2024 and five local
organisa�ons and groups were successful
in receiving a grant to enable them to
deliver their community tree plan�ng
projects.  A total of 3,344 trees will be
planted during 2024 through the
Woodland Grant Fund.  Ongoing
communica�on with all the groups is in
place to ensure that the projects are
progressing well.  
The four successful applicants from last
year’s Woodland Grant Fund (2022/23
season) submited their evalua�on reports
for their projects for the trees they
planted during 2023.  These reports will
now be reviewed, and the informa�on
provided will be used to improve future
rounds of the Woodland Grant Fund.  The
2024/25 Woodland Grant Fund will be
opened and adver�sed in the autumn. 
The fund will support local tree plan�ng
projects, including the crea�on of
community orchards.  
Our Streetscene team con�nues to work
with the volunteer network and local
schools to promote areas of wildflowers to
support biodiversity in North Ayrshire. 
Funding opportuni�es are being explored
to purchase equipment that will help the
service deliver an improved wildflower
meadow management plan.
Our Bourtreehill Park volunteers cleared
around 225m of paths and removed
approximately.  181m2 of Invasive species
(Rhododendron Pon�cum) to improve
accessibility and enjoyment for residents
in an area that had become inaccessible
due to vegeta�on encroachment.  
Three Junior Rangers sessions took place
in early 2024.  These sessions were
atended by 30 young people and
supported by six young leaders and four
volunteers.  During a session in January, a
trip to Haylie Brae Cairn took place to
assist Archaeology Scotland to maintain
the heritage asset and to contribute
towards the crea�on of a new resource
currently being developed by Forestry and
Land Scotland.  Their efforts were
rewarded with 12 of our young people
receiving a Heritage Hero Award.
Our Pupils at St John Ogilvie’s primary
school have been involved in a
consulta�on to inform the crea�on of a
public learning trail in Bourtreehill that
will focus on Science Technology
Engineering and Mathema�cs (STEM) and
local biodiversity.  Schools are being
supported to use a range of biodiversity
monitoring equipment as part of the
curriculum including wildlife cameras and
sampling equipment such as quadrats,
field iden�fica�on guides, soil moisture
and pH probes.  
The Sco�sh Government Biodiversity
Strategy to 2045 (SBS) states that local
authori�es will deliver a Scotland wide
Nature Network.  In response we are
developing a Nature Network strategy to
support a network that connects nature-
rich sites, restora�on areas and other
environmental projects through a series of
areas of suitable habitat, habitat corridors
and stepping-stones.  The North Ayrshire
Nature Network will help to halt
biodiversity loss by 2030 and achieve
nature posi�vity by 2045.  
Our statutory
Biodiversity Duty
report 2022/23 was
submited to the
Sco�sh

Page 25

Our Council Plan Progress Update – Year End 2023-24  Page 16 of 39
Government in January 2024.  It must be
completed once every three years and all
council services and arm’s length bodies
must submit returns to the report.  
A working group has been established
with other councils from across Scotland
to develop the content of an e-learn
module to increase awareness and
understanding of our Biodiversity du�es.  
Our first North Ayrshire Learning for
Sustainability (LfS) Partnership group met
in November.  It aims to provide council
services and local STEM and biodiversity
partners with opportuni�es to connect
and iden�fy projects that can be shared
widely across schools and the community,
or projects that will benefit from
collabora�on.  
Transport 
We have made significant progress on
local travel and ac�ve transport including
the adop�on of our Local Transport and
Ac�ve Travel Strategy.  We have raised
awareness of sustainable transport
choices through our Travel Smart
programme and the Trinity Ac�ve Travel
Hub, our social media and working with
workplaces, organisa�ons and volunteers
to provide ac�ve travel ac�vi�es across
the area.  
We have helped people develop more
posi�ve a�tudes towards sustainable
transport choices by con�nuing with
workplace engagement including crea�on
of travel plans and bike maintenance
classes.  
As part of the Electric Vehicle
Infrastructure Fund (EVIF) pathfinder
project, we are working in partnership
with East Ayrshire and South Ayrshire
Council to seek funding to install an
addi�onal 307 electric vehicle charge
points across Ayrshire, to support a just
transi�on to electric vehicles.
We have con�nued the construc�on of
the Links to Eglinton, Kilwinning Ac�ve
Travel Route.  We have also completed the
construc�on of the B714 links at Sharphill,
Saltcoats Ac�ve Travel Route.  
The North Crescent Coastal Path Phase
One in Ardrossan is now complete. 
Construc�on has commenced on the next
phase of Fairlie Coastal Path and is
programmed for comple�on in summer
2024.  We have also completed
construc�on of the Lover’s Walk, Dalry
Ac�ve Travel Route.  
Reuse and Recycling
Our council's bulky waste reuse partner
Cunninghame Furniture Recycling
Company (CFRC) collected 232 reusable
matresses (4.8 tonnes) from January to
March 2024.  783 (18.8 tonnes) of
matresses were collected in total during
the 2023/24 financial year, as part of the
ini�a�ve to promote opportuni�es for
their reuse.
CFRC also collected and reused 58 tonnes
of household furniture and assisted 497
households during January to March
2024.  A total of 200 tonnes of household
furniture was collected for reuse and
2,015 households were assisted to furnish
their homes in North Ayrshire during the
financial year 2023/24.
Our council con�nues to be one
of the highest performing
for household waste
recycling in Scotland
with a recycling rate
of 55.3% achieved in
2022, making the

Page 26

Our Council Plan Progress Update – Year End 2023-24 Page 17 of 39
council the 4th highest performing in
Scotland.  The average recycling rate in
Scotland for 2022 was 43.3%.  The dra�
calcula�ons for the 2023 recycling
performance have been submited to The
Sco�sh Environment Protec�on Agency
(SEPA), which will now be subject to
verifica�on checks prior to publishing later
in 2024.  The es�mated household waste
recycling performance for the calendar
year 2023 has improved to 56.1% (subject
to verifica�on).
SEPA published new guidance at the end
of 2023 regarding the management of
Persistent Organic Pollutants (POPs) in
Waste Upholstered Domestic Seating
(WUDS), which has required changes to be
made to separate the material (for
incineration only) at our council's
Household Waste Recycling Centres
(HWRCs) and from fly tipped waste
uplifted by the Streetscene Service.  Work
is ongoing to review the current bulky
uplift service to align with the new SEPA
guidance.
The Scottish Government published a
draft Circular Economy Bill which is
progressing through parliament and is
expected to become law during 2024. 
Officers are working closely with COSLA,
SOLACE and Scottish Government through
a co-design process to develop the key
policy and actions to be taken forward
within a new Waste Route Map for
Scotland.  The Circular Economy Bill and
the Route Map once finalised will be used
to inform the development of our
council's new Zero Waste Strategy, which
will explore the options for further
improving performance in this area.  
We support volunteering groups through
the ongoing distribu�on of volunteering
packs.  Recently a new online process has
been established for volunteers to request
the upli� of liter picking bags. 
Streetscene in partnership with the
volunteering community, has supported
Keep Scotland Beau�ful's Spring liter
picking campaign through issuing liter
pickers and collec�ng liter picked
materials.

Page 27

Our Council Plan Progress Update – Year End 2023-24  Page 18 of 39
Adapta�on
Our council undertook our second climate
Adaptation Capability Assessment in
February 2024, with a cross-service
workshop.  We u�lised the Public Sector
Adapta�on Capability Framework and
Benchmarking Tool.  The framework has
four capabili�es and four maturity levels
for organisa�ons to track their adapta�on
journey and how they can develop each
capability.  Progress of the five ac�ons
from the first assessment were reviewed. 
The second assessment iden�fied five
ac�ons:
• Establish a formal Adapta�on Working
Group within the Council which will
include key stakeholders.  
• Ensure any adapta�on self-
assessments are captured within
Procurement’s Flexible Framework
annual assessment and Financial
Services annual Audit Scotland report.  
• Launch the Introduc�on to Adapta�on
learning module for employees.  
• Create local climate risk maps from
exis�ng publicly available GIS and
na�onal maps including, coastal
erosion, rainfall, wind and heat in
partnership with our council’s
Analy�cs Team.  
• Develop further the internal
partnership working between the
Sustainability and Flood Teams on
council flooding ini�a�ves and ac�ons.  
Our council has flood protec�on schemes
to reduce the impact of climate change on
our communi�es.  The severity and
frequency of flooding is expected to
increase as a result of climate change. 
Ongoing protec�on schemes include the
Millport Flood Protec�on Scheme, coastal
erosion works on Cumbrae and the
comple�on of the Upper Garnock Valley
Flood Protec�on Scheme with the

Page 28

Our Council Plan Progress Update – Year End 2023-24 Page 19 of 39
crea�on of a dam.  Flooding scheme
works have also been completed in
Kilbirnie and Dalry.  
North and South Ayrshire Councils are
replacing the Ayrshire Shoreline
Management Plan with a Coastal
Adapta�on Plan during 2024.  Two scoping
reports have been produced for Irvine Bay
and Stevenston Beach to iden�fy methods
to manage coastal erosion and safeguard
access to the beach.  
Net Zero Ambi�ons
A priority ac�on within the Sustainable
North Ayrshire Strategy is to develop
Community Climate Ac�on Plans for each
locality, building on the Climate Ac�on
Town Stevenston project.  Ini�al
development of this programme by the
Sustainability Team has progressed during
early 2024 with support from our
Connected Communi�es Service and APSE
Energy.  A community focused carbon
literacy module is in development to be
made available to community groups
throughout North Ayrshire by the summer.
We are planning to arrange a second
round of volunteering at Eglinton Park to
support the ongoing biodiversity works. 
This ac�vity was well received by
members of the team last year and has
helped to share the opportuni�es to
volunteer first-hand within our local
communi�es.
Next Steps
• We will revise our Renewable Energy
Strategy and build an asset
decarbonisa�on model.
• We will undertake addi�onal
awareness raising ac�vity to increase
the uptake of the Community
Renewable Energy Genera�on Fund.
• We will increase capacity to support
the ac�ons associated within our
LHEES strategy.
• We will con�nue to work with Keep
Scotland Beau�ful, to support free
energy resources for Secondary
Schools.
• We will implement our Local Transport
and Ac�ve Travel Strategy.
• We will con�nue to deliver our Travel
Smart programme.
• We will con�nue to review the current
bulky upli� service to align with the
new SEPA guidance.
• Our North Ayrshire Learning for
Sustainability (LfS) Partnership will
have its second mee�ng in May.
• We aim to complete the construc�on
of our Fairlie Coastal Path.
• We will develop a community focussed
carbon literacy module that will be
made available to community groups.

Page 29

Our Council Plan Progress Update – Year End 2023-24 Page 20 of 39
A Sustainable Council
Key Ac�vi�es
Our Workforce
In March, Audit Scotland commenced our
Best Value Thema�c Audit – ‘Workforce
Innova�on’ on behalf of the Accounts
Commission.  The outcome of this audit is
expected in the autumn.
The outcome of our Best Value Thema�c
Audit – ‘Leadership of the Development of
the Council’s Strategic Priori�es’ was
presented to the Audit and Scru�ny
Commitee in November.  More detail on
these audits can be found in the “Audits,
Inspec�ons and Accredita�ons” sec�on
below.
A Voluntary Early Release (VER)
programme provided an opportunity for
employees to volunteer to leave the
council.  An assessment on the impact on
service delivery and associated costs of
exit were considered and 85 employees
le� the council at the end of March 2024. 
As a result of our VER programme, a
number of service re-designs were
approved.  These will take affect from
April 2024.
Our council is now in its 14th year of
delivering a successful Modern
Appren�ceship programme across our
services.  This supports our
Appren�ceship Charter, confirms our
ongoing commitment to our young people
and provides a key element of our
workforce planning approach.  The
Modern Appren�ceship programme
creates a diverse range of opportuni�es
with ringfenced places for young people
with a disability and / or care experience. 
It u�lises over 20 different frameworks
including Ac�ve Leisure, Business
Administra�on, Civil Engineering,
Hor�culture, Housing, Social Sciences and
youthwork.  There have been many
posi�ve outcomes for our Modern
Appren�ces over the last five years with
over 100 young people progressing into
promoted posts within our council.  Our
programme is also highlighted as an
example of good prac�ce by Educa�on
Scotland who stated in their Community
Learning and Development Progress Visit
Report in October that “…the input from
MAs [Modern Appren�ces] is helping the
service be innova�ve and remain
responsive to learners’ changing needs,
especially for children and young people.”
and as a result is progress worth sharing
more widely.
Our council’s Leadership Academy
provides a series of development
interven�ons to our leaders at all levels of
their career.  During 2023/24, 896
delegates days have been delivered with
506 employees ac�vely engaging in these
development solu�ons to enhance their
skills and knowledge.
1,274 referrals have been made to our
Occupa�onal Health Service to provide
support in rela�on to areas such as health
and fitness, Counselling, Cogni�ve
Behavioural Therapy, Physiotherapy and
health advice.  This is also complimented
with training for managers and online
informa�on.  
Our Livewell programme
which is designed and
led by our workforce
for our workforce,
has hosted
ini�a�ves such as

Page 30

Our Council Plan Progress Update – Year End 2023-24 Page 21 of 39
healthy ea�ng, weight management,
mental health, financial wellbeing, health
checks, mindfulness and media�on.  This
has led to 3,487 interac�ons from our
employees across our council.  
Effec�ve use of resources
As part of our ‘No Wrong Door’ approach,
our Transforma�on team has worked with
key stakeholders to create a new
streamlined customer referral process. 
This new process will ensure that
customers only share their informa�on
with us once, before direc�ng them to the
most appropriate service provider.  This
includes both internal council services and
external support services.  It is hoped that
this new process will ensure a dignified
customer journey and allow the relevant
service or partner to act as quickly and
efficiently as possible.
Levelling Up Fund
As part of the Levelling Up Fund, we are
an�cipa�ng further guidance on the
recent £20 million alloca�on for Irvine
under the Long-Term Plan for Towns.  This
will include advice on developing the
Town Board required as part of the fund. 
The Department for Levelling Up, Housing
and Communi�es has advised that the
Area Leads and the UK Government’s
Towns Unit and High Streets Taskforce will
work with our council to develop the Town
Plan and provide ongoing support as the
funding is delivered.
On 20 November 2023 the UK
Government announced that 55 projects
had been provisionally selected to receive
funding from the Levelling Up Fund Round
Three.  This includes £122 million for six
projects in Scotland, including £17.54m
towards the North Ayrshire element of
Levelling Up for Ayrshire: Commercial and
Low Carbon Infrastructure proposal
submited by North and South Ayrshire
Councils.
This project seeks to deliver new energy
efficient commercial property and
associated access, ac�ve travel and
electric vehicle charging infrastructure at
key employment loca�ons across Ayrshire. 
This was comprised of two office pavilions
and two specula�ve flexible industrial
units at three sites in Irvine.  The three
Irvine sites proposed were Annickbank,
Kyle Road and i3.
Digital Renewal
As previously noted in our mid-year
report, North Ayrshire Council, in
partnership with South and East Ayrshire
Councils, submited a regional bid to the
Department for Science, Innova�on, and
Technology's (DSIT) £40 million 5G
Innova�on Regions (5GIR) programme. 
This ini�a�ve is designed to significantly
enhance the deployment of 5G
technology across the region, thereby
boos�ng digital connec�vity.  Ayrshire has
been successfully awarded funding
through this ini�a�ve, marking a major
advancement in our commitment to
improving digital connec�vity and
fostering technological innova�on
throughout the area.  
The funding will support five pivotal
projects alongside ecosystem
development, each tailored to harness
advanced 5G technologies to
meet specific regional
needs and
opportuni�es.

Page 31

Our Council Plan Progress Update – Year End 2023-24 Page 22 of 39
The five projects are:
1. Digital Processing Manufacturing
Centre: U�lising advanced
manufacturing technologies to
enhance efficiency and precision.
2. Aerospace Innova�on Hub: Applying
5G solu�ons to transform aerospace
design and manufacturing processes.
3. Small to Medium Enterprise Internet
of Things (SME IoT) Adop�on Project
at Moorfield: Empowering SMEs in
sectors such as food, drink,
manufacturing, and engineering with
IoT technologies for improved data
management.
4. Tourism Events Project: Boos�ng
visitor experiences at local events
through reliable, high-speed 5G
connec�vity.
5. Skills and Immersive Learning Project:
Employing virtual and augmented
reality to improve educa�onal
outcomes and prepare students for
future digital challenges.
Central to Ayrshire's digital strategy, the
Ecosystem Development cross-cu�ng
theme aims to foster a robust network of
innova�on through strategic partnerships. 
Key partners include the University of the
West of Scotland, Ayrshire College, the
Na�onal Manufacturing Ins�tute Scotland
(NMIS), and Scotland 5G Centre, all
collabora�ng to integrate cu�ng-edge
digital solu�ons across regional industries
and educa�onal ins�tu�ons.  
The project aligns with our strategic focus
on innova�on, skills development, and
community engagement as outlined in the
Regional Economic Strategy.
Digital Maturity Assessment Update 
Following the successful funding
acquisi�on, the Digital Connec�vity
Maturity Assessment was conducted to
gauge our current digital infrastructure
and plan future enhancements effec�vely. 
This comprehensive evalua�on, along with
extensive stakeholder engagement,
provided deep insights into our exis�ng
infrastructure, pinpoin�ng areas needing
improvement and iden�fying

Page 32

Our Council Plan Progress Update – Year End 2023-24  Page 23 of 39
opportuni�es to leverage both local and
na�onal government investments in
digital connec�vity, as well as private
sector investments in full-fibre broadband.
This assessment has laid a solid
founda�on for North Ayrshire’s
progression towards becoming a digitally
inclusive, economically vibrant and smart-
connected community.  By exploring the
iden�fied challenges and recommended
strategies, we are poised to significantly
enhance digital connec�vity and
readiness, paving the way for a flourishing
future in North Ayrshire.
Robust Governance
Prior to our mee�ng of Council to discuss
the 2024/25 budget, Equali�es and
Children's Rights Impact Assessments
(ECRIAs) screenings or assessments were
completed for all budget proposals.  A
project is due to commence to develop
these further and improve the quality of
updates through training and revision of
the templates.  This is being informed by
na�onal Childrens Rights Impact
Assessments (CRIAs).
To ensure good governance and clear
accountability for delivering the desired
outcomes for service users and
communi�es, we are upda�ng our Code of
Corporate Governance on an annual basis.
Shared Prosperity Fund (SPF)
The second round of our Communi�es
and Place Fund obtained Cabinet approval
in February.  The Fund is now closed with
53 applica�ons under review.  The People
and Skills and Suppor�ng Local Business
Shared Prosperity Fund (SPF) priority
ac�vi�es are ongoing, with UK SPF
(UKSPF) replacing the European Social
Fund (ESF) funding for Employability and
Skills.
The Par�cipatory Budge�ng funding
through UKSPF will take place later in
2024, with a budget of £31,000 available.
Next Steps
• We will con�nue to embed and evolve
our Workforce Planning approach
mee�ngs.
• We will con�nue to support the Audit
Scotland Best Value Thema�c Work.
• We will launch a project to develop
and improve the quality of Children's
Rights Impact Assessments.
• Awards will be made under the
Communi�es and Place Fund.
• The Par�cipatory Budge�ng funding
through UKSPF Communi�es and Place
Fund will take place later in 2024, with
a budget of £31,000 available.

Page 33

Our Council Plan Progress Update – Year End 2023-24 Page 24 of 39
Case Study – No Wrong Door
Historically, our services needed to rely on our residents to contact various services
themselves and the services didn’t have visibility of any other teams our residents were
involved in.  
To tackle this our No Wrong Door ini�a�ve aims to ensure our residents can always access
the informa�on and support they need from our council and Community Planning Partners. 
It is strongly supported by the Child Poverty and Cost of Living Board and key to our Council
Plan and Digital Strategy 2023-28.  It ensures people are at the centre of innova�on and no
one is le� behind to prevent digital exclusion.
There are two main elements to our No Wrong Door approach, ‘Corporate Referral’ and
‘Single Shared Assessment”.  
Our new Corporate Referral process is now live.  As a result of the review, our residents only
need to provide their informa�on once and will be directly routed to the services that best
meet their needs.  In addi�on, services are no�fied immediately when a request for support
is submited via the online form on our website.  This form is also used by our Customer
Services team when residents call or visit our offices, ensuring that those without internet
access are not digitally excluded and s�ll receive the same high level of support.
Following the no�fica�on, services contact the resident to complete an assessment of their
needs allowing us to route the referral to the appropriate services or external partners to
provide the best support.  These services or partners then make direct contact with the
resident, reducing cost and the poten�ally overwhelming task for residents to contact
mul�ple services and partners.  
Our emerging Single Shared Assessment approach will inform decision making and provide
residents with assistance more quickly through a whole system approach offering immediate
and longer-term support to li� people out of the cycle of poverty.  This will be achieved by
asking residents at the point of applica�on for their consent to use their details to assess
eligibility for all benefits, grants and support available across our council in one applica�on. 
This ul�mately will create a ‘golden record’ to proac�vely help residents access the support
they are en�tled to.

Page 34

Our Council Plan Progress Update – Year End 2023-24 Page 25 of 39
Audits, Inspec�ons and Accredita�ons
Best Value Thema�c Approach – Leadership of the Development of the Council’s
Strategic Priori�es
The results of our Best Value Thema�c Audit on the leadership of the development of the
council’s strategic priori�es was presented to the Audit and Scru�ny Commitee in
November.  The results were very posi�ve, sta�ng our council “con�nued to demonstrate a
strong culture of con�nuous improvement”.  The engagement with our communi�es in
jointly crea�ng our priori�es within our Council Plan 2023-28 was also highlighted.  How we
report to ensure effec�ve scru�ny was posi�vely received.  Further good progress has been
made since our Best Value Assurance Audit in June 2020.
The following recommenda�ons were highlighted within the report with progress reported
directly to our Audit and Scru�ny Commitee.  
Recommendation Agreed Management Action
The council should conclude its website
review and make its improvements as soon as
possible.  This will bring many benefits to
users, including raising more awareness of its
vision and priorities.
The website redesign project is currently
progressing at pace and the aim is to have a
Beta version live by Summer 2024 and the full
version live by Autumn 2024.  To improve the
visibility of the Council Plan and priorities, the
home page will be revised to include reference
to our Council Plan 2023-28.
The council should ensure that all the
performance information published on its
website is up-to-date, performance reports
are as timely as possible and audit and
inspection information is easily accessible and
includes how the council is responding to
recommendations.
The website will be reviewed to remove or
replace out of date information.  Audits and
inspections will be including in six monthly
Council Plan Progress reports (these reports)
published on our website.
The council should update all locality
planning information and corresponding links
as soon as possible.
The Community Planning Partnership (CPP)
website will be reviewed to ensure all locality
planning information and links are up to date.
The CPP website will be refreshed with new
Locality Partnership pages.
The council should consider including more
information on its website about what it is
doing to address climate change and the
progress it is making.
The council’s website will be updated to include
more information on what we are doing to
address climate change and progress we are
making, including publication of a dedicated
public facing climate change webpage.  
Options for a social media page dedicated to
climate change will be investigated.
Source:  Leadership of the development of the council’s strategic priorities.  Best Value
Thematic Work in North Ayrshire Council 2022-23.

Page 35

Our Council Plan Progress Update – Year End 2023-24 Page 26 of 39
A further update on progress against these recommenda�ons is due to be presented to the
Audit and Scru�ny Commitee in May 2024.  Audit Scotland is expected to publish a na�onal
report on this specific theme in the summer which will enable benchmarking of approaches
with other local authori�es.
Best Value Thema�c Approach – Workforce Innova�on
In March, Audit Scotland commenced the Best Value Thema�c Audit – Workforce Planning
on behalf of the Accounts Commission.  
This focused on the following areas:
• How effec�vely our council’s workforce plans are integrated with its strategic plans and
priori�es.  
• How effec�vely digital technology has been used to support workforce produc�vity and
improve service quality and outcomes.  
• What innova�ve prac�ce our council is using to develop its future workforce capacity
and skills needs and manage staff reduc�ons in line with its priori�es.
• What progress our council has made with sharing roles or func�ons across its services
and/or with other councils and partners.
• How effec�vely our council is measuring the impact of its workforce planning approach.
Next year Audit Scotland will release a na�onal report on Workforce Innova�on to share
good prac�ce.
The results of the audit will be presented to the Audit and Scru�ny Commitee in the
autumn and any resul�ng ac�ons will be considered.  Developments for Workforce
Innova�on include:
• Con�nua�on of Workforce Planning mee�ngs to further embed and evolve the
approach.
• Con�nue support to Audit Scotland Best Value Thema�c Work between April and June.
• Host Learning Events to increase knowledge in rela�on to the applica�on of policies and
procedures.
• Con�nue to evolve and increase our use of digital interven�ons.  
Internal Audit – Council’s Workforce Planning
January 2024 - An Internal Audit report on Workforce Planning was completed and granted
an assurance level of “Substan�al”.  This was prior to the Audit Scotland Best Value Thema�c
Audit detailed above.  No ac�ons were required as detailed in the report to our Audit and
Scru�ny Commitee.
Cyber Security – Public Services Network
In January 2024, we received no�fica�on from the Sco�sh Government Cabinet Office that
the council’s annual Code of Connec�on applica�on successfully passed assessment.  
The Public Services Network (PSN) was established to allow public service organisa�ons to
share informa�on and services in a secure environment.  Before an organisa�on can connect
to the PSN there is a requirement to pass the PSN compliance process and demonstrate that

Page 36

Our Council Plan Progress Update – Year End 2023-24 Page 27 of 39
our infrastructure is sufficiently secure.  For the first �me since the PSN was fully established
over 10 years ago this was achieved without the requirement of further clarifica�ons or
remedia�ons being sought.
HMIE – Community Learning and Development
In a recent HMIE report our Community Learning and Development teams have been
recognised as making a significant posi�ve impact on our communi�es in terms of inclusion
and reducing barriers.  
Health and Social Care Partnership 
Our Health and Social Care Partnership (HSCP) performance is reported separately through
the HSCP.  Our HSCP works closely with independent care providers to ensure that the care
and support provided is being delivered in line with peoples’ outcomes, offers best value,
meets regulatory requirements and keeps people healthy and well.  
Care services provided by our partnership teams undergo external inspec�ons and are
subject to rigorous review and inspec�on.  Full details are available within the Health and
Social Care Partnership’s Annual Performance Report.

Page 37

Our Council Plan Progress Update – Year End 2023-24 Page 28 of 39
Performance Summary
Measures Adri� of Target
This sec�on details the performance indicators adri� of target and the ac�on being taken to
address performance.  Due to expected data lags the most recent data may relate to
previous �me periods but may only now be available to report.  To avoid duplica�on, only
data that has not previously been reported to our Cabinet is included in this sec�on.
CP_29 Overall carbon emissions (tonnes) (Non-domes�c Council estate)  - Significantly Adri�
of Target
For 2023/24, the total carbon emission figure is 20,745tCO2e.  This is a 0.72% reduc�on
from 2022/23 emissions, and 69.4% reduc�on from our 2005/06 baseline year.  When
calcula�ng our council’s carbon emissions, we consider fossil fuel usage from employee
travel, fleet transport, waste, street ligh�ng, KA Leisure buildings and our non-domes�c
estate (including PPP schools). 
There is an increase in emissions associated with our non-domes�c estate when compared
with the previous year, specifically caused by hea�ng fuels.  We will analyse our proper�es
with excessive energy demand to determine the best approach.
Following increased capacity within the Sustainability Team, energy management prac�ces
will be reinvigorated to scru�nise energy use, ins�l behaviour change and deliver carbon
reduc�on projects.  Behaviour change will be encouraged through an employee energy
awareness campaign which includes u�lising our Leadership Programme, other internal
communica�on channels and a new training module prior to the hea�ng season beginning
in September.  
On Target, 13,
50%
Slightly Adrift of
Target, 2, 8%
Significantly
Adrift of Target,
2, 8%
Data Only /
Status Unknown,
9, 34%
Performance Indicators
On Target
Slightly Adrift of Target
Significantly Adrift of Target
Data Only / Status Unknown
On Target, 45,
98% Slightly Adrift of
Target, 1, 2%
Actions
On Target
Slightly Adrift of Target
Significantly Adrift of Target

Page 38

Our Council Plan Progress Update – Year End 2023-24 Page 29 of 39
CP_46 Number of trees planted under the North Ayrshire 2030 Tree Plan�ng Strategy  -
Significantly Adri� of Target
The total number of trees planted at the end of 2023/24 was 36,366, which is slightly lower
than the projected target of 40,000, however the total number of trees planted within the
first three years of the strategy is on track to achieve the overall target of 108,000 trees to
be planted by 2030, with six years of the strategy remaining.  We have made a conscious
decision to defer plan�ng one of our larger key plan�ng sites to allow for the regrading of
soil from another area of the same development site, which will reduce the associated
development costs to the council.  The plan�ng at the site will commence a�er the soil
regrading works are complete.
The level of response from the Woodland Grant Fund applica�ons in 2023/24 was not as
high as expected, so we will be looking to do more publicity around the grant funding this
year to hopefully improve the level of uptake in the next round.  The 2024/25 Woodland
Grant Fund will be opened and widely adver�sed in the autumn, which will support local
tree plan�ng projects including the crea�on of new community orchards.  The Streetscene
Service is also currently reviewing several poten�al plan�ng sites for developing new tree
plan�ng proposals for the 2024/25 tree plan�ng season.
CP_43 Number of council assets under community management (cumula�ve)  - Slightly Adri�
of Target
The number of council assets under community management for 2023/24 was 53.  This is
one fewer than the 54 target.  A Community Asset Transfer was due to conclude prior to the
year end, unfortunately external factors caused a delay in the final stages of the process. 
However, this is expected to be resolved by April 2024.   
CP_31 Percentage of total household waste that is recycled (calendar year as per SEPA)
(LGBF)  - Slightly Adri� of Target
This is a provisional figure as the dra� calcula�ons for the 2023 recycling performance have
been submited to SEPA and will now be subjected to verifica�on checks.  As a result, they
may change prior to issuing in September or October 2024.  The es�mated household waste
recycling performance for the calendar year 2023 is es�mated to be 56.1%.  This is under the
57% target but an improvement on last year’s performance (55.3%).
A new Zero Waste Strategy is being developed during 2024 to explore the poten�al
opportuni�es for improving reuse and recycling performance.

Page 39

Our Council Plan Progress Update – Year End 2023-24 Page 30 of 39
Ac�ons Adri� of Target
CP_29 Promo�ng new woodland crea�on and protec�ng our green spaces to provide a
natural resource for carbon sequestra�on  - Slightly Adri� of Target
Our tree plan�ng work contributes to this ac�on and as detailed above (CP_46), we didn’t
meet our tree plan�ng target for 2023/24.  We will look to increase publicity around the
Woodland Grant Fund this year to hopefully improve the level of uptake in the next round. 
The 2024/25 Woodland Grant Fund will be opened and widely adver�sed in the autumn,
which will support local tree plan�ng projects, including the crea�on of new community
orchards.  The Streetscene Service is also currently reviewing several poten�al plan�ng sites
for developing new tree plan�ng proposals for the 2024/25 tree plan�ng season.
Indicator Amendments and Recommenda�ons
CP_06 Average tariff score: All Leavers
Following a refresh of data within the na�onal Insight system, the 2020/21 annual figure has
changed from 912 to 908.5 and the 2021/22 figure has changed from 905.6 to 899.5.  These
changes do not impact on the status of this �me periods.  
CP_38 Average total tariff for Care Experienced Young People
Following a refresh of data within the na�onal Insight system, the 2021/22 annual figure has
changed from 457 to 413.8 and the 2022/23 figure has also changed from 430 to 413.8.  This
change did not impact on the status of these �me periods.  
CP_39 Number of unemployed people progressing into employment (since 1st April)
The Quarter Two figure of 652 has been amended to 215.  A cumula�ve figure combining
the Quarter Four 2022/23 and Quarter One 2023/24 figures was used in error.  This indicator
is cumula�ve from the beginning of each financial year, but not across years.  Appropriate
changes to the indicator descrip�on have been made on the performance management
system to avoid this in future.  
However, to align with na�onal repor�ng it is recommended that this performance indicator
is replaced with the “Number of unemployed people that have progressed to employment
as a result of par�cipa�on in council funded or operated employability ac�vi�es”.  This figure
is calculated for the official SLAED release and gives scope to include job outcomes which,
under the current indicator, are not included un�l the subsidy ends.  
CP_19 Propor�on of opera�onal buildings that are suitable for their current use (LGBF)
The Quarter Two figure of 91.5% was incorrect and has been corrected to 95.1%.  This was
due to a data entry error.  As a result, the status of this indicator has changed to on target
(green).

Page 40

Our Council Plan Progress Update – Year End 2023-24 Page 31 of 39
Performance Indicators
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
2023/24
Value
2023/24
Target
2023/24
Status
2024/25
Target
CP_36 Number of residents
participating in community learning and
development activity including youth
work
17,269 17,804 23,503 18,700 19,500
CP_04 Proportion of children meeting
developmental milestones (LGBF) 82.2% 78.7% 79.5%
Data
Available
April 2025
79% 79%
CP_37 Average total tariff score of
pupils living in SIMD 20% most deprived
areas
724 711 670.2
Data
Available
March
2025
714 720
CP_06 Average tariff score: All Leavers* 908.5 900 899.5 880 847.2
Data
Available
March
2025
908 910
CP_38 Average total tariff for Care
Experienced Young People 448 413.8 413.8
Data
Available
June 2025
465 470
CP_07 Percentage of school leavers
entering positive destinations (LGBF)* 95.2% 96.2% 96% 93.5% 96.5%
Data
Available
April 2025
96.4% 96.8%
CP_39 Number of unemployed people
progressing into employment (since 1st
April)
285 200 524 450 437 475 450 475
PI Status
Significantly Adrift of Target
Slightly Adrift of Target
On Target
Data Not Available
Data Only

Page 41

Our Council Plan Progress Update – Year End 2023-24 Page 32 of 39
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
2023/24
Value
2023/24
Target
2023/24
Status
2024/25
Target
CP_10a Percentage of procurement
spent on local enterprises 21.39% 23.5% 22.93% 24% 26.04% 25% Data
Pending 26% 27%
CP_40 Number of new build housing
units reaching completion (all tenures)
(Actual not cumulative)
562 384 295 396
CP_41 Number of empty homes brought
back into use (Actual) 122 335 120 378 200 300
CP_28 Hectares of vacant & derelict
land in North Ayrshire 1,204 1,194 1,198 1,144 1,130.43 1,094 951.51 1,094 925
CP_27 Street Cleanliness Index –
Percentage Clean (LGBF) 91.34% 94% 86.7% 94% 84.6% 90  89.1%** 87% 87%
CP_20 Overall percentage of road
network that should be considered for
maintenance treatment
37.1% 38.1% 33.9% 37.5% 34.8% 33.8% 32.5% 34.8% 32.5%
CP_42 Provided floor space of
commercial/industrial space within our
Council portfolio (sq ft)
400,991 404,897 404,755 423,077
CP_02 Percentage of Council budget
directed via participatory methods 1.13% 1.2% 2.32% 1.1% 2.74% 1% 2.05% 1.5% 1.5%
CP_43 Number of Council assets under
community management (cumulative) 49 53 54 56
CP_30 Total installed capacity of low
carbon heat and electricity generation
across the Council's estate
10,720 9,800 11,680 11,000 12,104 11,800 15,992 12,000 28,499
CP_29 Overall carbon emissions
(tonnes) (Non-domestic Council estate) 22,846 35,127 21,791 21,247 20,896 21,000 20,745 19,500 19,953

Page 42

Our Council Plan Progress Update – Year End 2023-24 Page 33 of 39
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
2023/24
Value
2023/24
Target
2023/24
Status
2024/25
Target
CP_44 Percentage of council dwellings
that are energy efficient (LGBF)* 97.6% 97.7% Data
Pending
Data
Pending 98.1% 98.5%
CP_45 Length of new or improved active
travel routes per annum (Metres) 1,090 3,900 2,000 2,000
CP_46 Number of trees planted under
the North Ayrshire 2030 Tree Planting
Strategy
35,627 36,366 40,000 47,000
CP_19 Proportion of operational
buildings that are suitable for their
current use (LGBF)
91.05% 93% 91.1% 93% 95.1% 93%
Data
Available
Oct 2024
92.1% 93%
CP_31 Percentage of total household
waste that is recycled (calendar year as
per SEPA) (LGBF)
52.1% 52.1% 56.3% 53.1% 55.3% 56.9% 56.1%**
* 57% 56%
CP_25 Percentage of Council dwellings
that meet the Scottish Housing Quality
Standard (LGBF)
98.83% 99.5% 49.3% 99.5% 63.2%
Data
Available
Oct 2024
72.5% 97.4%
CP_47 Gross rent arrears (all tenants) as
at 31 March each year as a percentage
of rent due for the reporting year (LGBF)
5.5% 6.6% 7.1% 5.88%** 6.5% TBC
CP_48 Percentage of income due from
Council Tax received by the end of the
year (LGBF)
92.1% 93.3% 94.7%
Data
Available
Oct 2024
94% 98%
*No target provided for 2022/23 as the reporting period was underway when the indicators were approved within the Performance Management Framework
**Annual figure is based on local data.  This figure is subject to change after future data releases.
***This figure is provisional data.

Page 43

Our Council Plan Progress Update – Year End 2023-24 Page 34 of 39
Ac�on Tracker
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP01 Ensuring that wellbeing is at the heart of local life and
opportunities, with a focus on tackling inequalities.
CP02 Developing a Community Wealth Building approach to a
wellbeing economy.
CP03 Improving educational attainment and achievement and
closing the attainment gap.
CP04 Improving outcomes for care experienced young people
including implementation of The Promise.
CP05 Developing the Young Workforce and ensuring positive
destinations for school leavers.
CP06 Providing lifelong learning opportunities for individuals
and organisations, including digital literacy.
CP07 Maximising access to and uptake of benefits, entitlements
and financial advice.
CP08
Ensuring that supports are available in communities to
alleviate cost-of-living pressures through community hubs
and networks.

Page 44

Our Council Plan Progress Update – Year End 2023-24 Page 35 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP09
Through our housebuilding programme and wider Housing
Investment provide homes for life that meet the needs of
our residents.
CP10
Increase the number of homes in the area through a mix
of private and social developments and bringing empty
buildings back in to use.
CP11
Exploration of models and the development of pilot
schemes to increase access to and use of
public/community transport.
CP12 Ensure our places and spaces where we live, work and
visit are well maintained and accessible.
CP13 Developing infrastructure to support business growth.
CP14 Support KA Leisure’s leadership of North Ayrshire’s Health
and Wellbeing Alliance.
CP15
Through the Health and Social Care Partnership Strategic
Plan we will protect and provide care and support for
those in need.****
CP16
Developing strong relationships with communities and
partners based on trust and shared aspirations using their
experiences to inform service provision.
CP17
Providing support for community organisations in
achieving their goals, including as Community Wealth
Building anchor organisations.

Page 45

Our Council Plan Progress Update – Year End 2023-24 Page 36 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP18
Creating a participation and engagement framework
which ensures opportunities and support for all residents
to take part in influencing local democracy and council
and partner strategies.
CP19 Supporting participatory budgeting.
CP20 Supporting community asset transfer and community
owned and operated/managed assets.
CP21 Supporting the Community Planning Partnership and the
Community Plan (LOIP).
CP22 Developing partnerships with the third and voluntary
sector.
CP23
Placemaking, including creation of locality action plans
based on the Community Plan (LOIP) priorities and
support the delivery of Islands Plans.
CP24 Ensuring an inclusive, fair, rights-based and asset-based
approach in our work.
CP25 Accessible public services, both digitally and locally,
ensuring a ‘No Wrong Door’ approach.
CP26 Embedding our net-zero ambition in all democratic
decision-making.
CP27 Reducing the carbon footprint of our estate through
rationalisation utilising a locality-based approach and

Page 46

Our Council Plan Progress Update – Year End 2023-24 Page 37 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
taking a fabric first and low carbon energy generation
approach to homes and buildings.
CP28
Improving resilience and reducing carbon by developing
and supporting supply chains where materials and goods
are sourced locally.
CP29
Promoting new woodland creation and protecting our
green spaces to provide a natural resource for carbon
sequestration.
CP30 Supporting local businesses as they meet their climate
change obligations.
CP31
Promoting a circular economy in North Ayrshire to reduce
consumption of raw materials and promote reuse, repair
and recycling, and generating energy from residual waste.
CP32 Developing local low carbon energy generation schemes
and networks.
CP33
Unlocking the potential of community owned energy
generation to bring new income streams into
communities and help them take direct action to combat
climate change.
CP34
Learning for Sustainability, and work with communities to
adopt low carbon behaviour change and encourage
climate-based volunteering activities.
CP35 Improving communities’ preparedness to deal with the
impacts of climate change already locked-in.

Page 47

Our Council Plan Progress Update – Year End 2023-24 Page 38 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP36
Working with communities to adopt low carbon behaviour
change and encourage climate-based volunteering
activities.
CP37 Taking a nature-based approach to protect our habitats
and species.
CP38 Developing and promoting active travel infrastructure.
CP39 Transitioning to low and zero carbon travel.
CP40
Ensuring robust governance arrangements are in place to
fulfil the council’s statutory duties, manage risk and
support delivery of key priorities.
CP41 Using dynamic data and lived experiences to inform
decision-making.
CP42
Working with partners nationally, regionally and locally to
secure investment and target resources towards our
priorities.
CP43
Driving change and transformation, using technology
where appropriate, to deliver efficient and effective
services and support delivery of priorities.
CP44 Maximising financial flexibilities to help support delivery
of priorities.

Page 48

Our Council Plan Progress Update – Year End 2023-24 Page 39 of 39
****Delivery of this ac�on is managed through the Health and Social Care Partnership Strategic Plan.
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP45 Maximising value from the use of our assets.
CP46 Focusing our investment on priorities.
CP47 Effective workforce planning ensuring that we have the
right skills/resources to deliver priorities.

Page 49

Our Council Plan Progress Update – Year End 2023-24
Page 40 of 39
We strive to make our repor�ng as accessible as possible.  If you have any
ques�ons or require further informa�on on our council’s performance
please contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance

Page 50

North Ayrshire Council
Annual Performance Report
2023 to 2024
Appendix 2

Page 51

Welcome to our Annual Performance
Report 2023 to 2024
This Annual Performance Report is the first annual report relating to our new Council Plan.  Our
Council Plan 2023 to 2028 was approved by Council in June 2023 following consultation with our
residents.  It is our joint plan, our contract with our communities, Our Council Plan.  
This report provides an at a glance summary of how we’ve supported our residents of North
Ayrshire during 2023 to 2024.  You can find full details in our magazine style Council Plan Progress
Reports published on our website (https://www.north-ayrshire.gov.uk/performance).
We are proud to serve our people of North Ayrshire and would like to say thank you to everyone
who has supported the delivery of our services including our communities, third sector, public and
private partnerships and of course our employees. 
Councillor Marie Burns
Leader of the Council
Craig Hatton
Chief Executive
Our Vision – A North Ayrshire that is fair for all.
Our Mission – Working together to improve the lives of our people in
North Ayrshire.
Our four Council Plan priorities are interlinked and interdependent.  They are:

Page 52

2023 to 2024 About Us 
Elected Members 
• 12 Scottish National Party (SNP) 
• 10 Scottish Conservative and Unionist 
• 6 Scottish Labour Party
• 3 Labour and Co-operative Party
• 2 Independent 
Employees 
• 7,690 employees
• 6,561 full time equivalent (FTE) employees
• 1,129 part-time employees
• 75.5% female 
• 24.5% male 
Key Facts
• Population:  133,490
• Life Expectancy:
o Female:  79.7 years
o Male:  74.4 years
• 19,617 children and young people attend our
schools and early years centres (including
partner early years centres). 
• 29.2% of children in North Ayrshire live in
poverty (after housing costs)
• 70.3%% of residents are in employment.
• 40.9% of our residents live in the most
deprived Scottish Index of Multiple
Deprivation areas.
Key assets include: 
• 42 Local Authority Early Years Provisions
• 14 Partner Early Years Provisions
• 48 Primary Schools
• 8 Secondary Schools
• 1 Additional Support Needs School 
• 1 Through School (Early Learning Centre,
Primary and Secondary School combined) 
• 13,163 council homes
• 1,118 km carriageway 
• 3,900mm footpaths
• Approx.  23,750 streetlights
• 16 beaches (including three Sites of Special
Scientific Interest (SSSI)
• More than 275 Hectares of woodland
• 15,992kW Total installed capacity of low
carbon heat and electricity generation across
our council’s estate

Page 53

Financial Overview 
Chief Executive's
Service, £22.365 ,
5%
Communities
and Education,
£182.795 , 43%
Place, £59.961 ,
14%
Health and
Social Care
Partnership,
£124.933 , 30%
Other Corporate
Items, £11.681 , 3%
Financing Costs,
£20.360 , 5%
Allocation (£000's)
Chief Executive's Service Communities and Education
Place Health and Social Care Partnership
Other Corporate Items Financing Costs
Scottish
Government
General Grant,
£294.729, 70%
Scottish
Government
Specific Grant,
£19.673, 5%
Non Domestic
Rates, £42.175,
10%
Council Tax,
£65.518, 15%
Funding (£000's)

Page 54

Our Performance
This section highlights key areas we have delivered under each of the four priorities: ‘Wellbeing’,
‘Communities and Local Democracy’, ‘Climate Change’ and ‘A Sustainable Council’.  Full details can be
found in our six monthly Council Plan Progress Reports on our website www.north-ayrshire.gov.uk. 
Wellbeing
• We established a Financial Inclusion Partnership to increase access to financial advice and
support for our residents.
• We are funding two additional School Welfare Rights Officers providing financial
advice and assistance to parents and carers.
• We agreed to provide a £50 clothing grant to all eligible three and four
year olds in Early Years during the 2024/25 school year to help with the
cost of living.
• We were awarded £79,181 to proactively support residents in
accessing the support they are eligible for following a successful
grant application to the Scottish Government Child Poverty
Practice Accelerator Fund (CPAF).
• Cabinet approved the extension of our free school meals
programme.  This will provide a healthy mid-morning snack for
all primary school children and availability of ambient food
during 2024/25.
• The Winter Warmer Breakfast initiative has been extended
providing breakfasts to Secondary School pupils from November
2024 to March 2025.
• All eight mainland Secondary Schools now have access to mentoring
services following the successful recruitment of MCR Pathway Co-
ordinators with discussions in progress to deliver the service to Arran
High School.
• Our council approved a definition to enable care experienced to be treated
as a protected characteristic within our Equality and Children’s Rights Impact
Assessments (ECRIAs).
• Our young parents’ group was launched in January 2024 with 15 young parents under the
age of 25 regularly engaging in weekly activities to increase their confidence and support improvement
in their and their children’s physical, mental, emotional and relational wellbeing.
• Our refreshed Community Wealth Building Strategy was approved by Cabinet in February and aims to
work towards achieving a wellbeing economy for North Ayrshire.
• 378 empty homes have been brought back into use during 2023/24.  
• 384 new building housing units are reaching completion.

Page 55

Communities and Local Democracy
• 2.05% of Council budget is directed via participatory budgeting methods,
higher than our target of 1.5% and national target of 1%.
• Our Community Investment Fund has approved funding for 13
applications over the year, totalling £721,912.
• We relaunched our Housing Services’ Customer Participation Strategy
for 2023 – 2028. This will ensure that our communities are involved in
decision making and are empowered to influence how we deliver our
Housing Service.
• We successfully launched the Community Directory tool  together with
the new Community Planning website.
• To date, 53 council assets have been transferred to community
management.
Climate Change
• Our Local Heat and Energy Efficiency Strategy (LHEES) and accompanying Local Heat
and Energy Efficiency Strategy - Delivery Plan were approved by Cabinet on 23rd January
2024.
• We launched a £350k Community Net Zero Carbon Fund, enabling local community groups to bid for
funding to help with feasibility and / or renewable energy technologies on land or buildings they own.
• Our council's solar PV farm developments have progressed to construction stage.  Both Nethermains
and Shewalton site clearances have been completed, with fencing being installed and consideration
being given to provision of mammal gates to support biodiversity on the sites.
• A feasibility study for wind and solar on the i3 site in Irvine has been completed and further works are
being undertaken to understand the options available for low carbon energy generation schemes for
the site.
• Our council continues to support wider action on climate change.  Four community
renewable projects have been awarded funding through the Community
Renewable Energy Generation Fund, totalling approx. £130,000.
• 2,015 households were assisted to furnish their homes in North
Ayrshire due to our bulky waste reuse partner Cunninghame
Furniture Recycling Company (CFRC) collecting and processing
reusable items such as mattresses and furniture.
• 36,366 trees have been planted to date across North
Ayrshire through various projects and by community
partners.
• 209 businesses were supported to reduce their
environmental impact.

Page 56

A Sustainable Council
• Our Council Plan 2023-28 was approved by Council in June 2023.
Developed with our communities, our Council Plan is our
contract with our residents.
• Our first Best Value Thematic Audit on ‘Leadership of the
Development of the Council’s Strategic Priorities’ results
showed our council “continued to demonstrate a strong
culture of continuous improvement”.  Engagement with
our communities in jointly creating our Council Plan
2023-28 was also highlighted.
• As part of our ‘No Wrong Door’ approach, we have
created a new streamlined customer referral process.
This new process will ensure that customers only share
their information with us once and are directed to the
most appropriate service provider (internal council
services and external support services).
• Our council secured an award of £242,000 from the UK
Government's Department for Science, Innovation and
Technology (DSIT) to advance wireless infrastructure and 5G
technology. We were one of six successful local authorities and the
only one in Scotland.
• Council approved a balance budget for 2024/25.
Areas of Focus
Areas of focus for the next six months are included in our six monthly Council Plan Progress Reports on our
website www.north-ayrshire.gov.uk.
How do we compare?
You can discover how our performance
compares to other Scottish local authorities
through the national Local Government
Benchmarking Framework online tool or
through our LGBF Report published within our
Year End reporting on our website www.north-
ayrshire.gov.uk.

Page 57

We strive to make our reporting as accessible as possible.  If you
have any questions or require further information on our
council’s performance please contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance

Page 58

Local Government
Benchmarking Framework
Analysis of April 2024
Data Release
Appendix 3

Page 59

Contents
Introduc�on ............................................................................................................................... 1
Our Approach ............................................................................................................................. 1
Analysis ...................................................................................................................................... 3
Family Groups ......................................................................................................................... 4
People Services ................................................................................................................... 5
Proportion of children living in poverty (after housing costs) ....................................... 5
Gross rent arrears (all tenants) as a percentage of rent due for the year .................... 6
Proportion of children meeting developmental milestones ......................................... 7
Proportion of pupils entering positive destinations ...................................................... 7
Proportion of council dwellings meeting the Scottish Housing Quality Standards ....... 8
Proportion of council dwellings that are energy efficient ............................................. 9
Other Services ................................................................................................................... 10
CO2 emissions area wide per capita (tonnes) ............................................................. 10
CO2 emissions area wide emissions within scope of local authority per capita
(tonnes) ........................................................................................................................ 11
CO2 emissions from Transport per capita ................................................................... 12
CO2 emissions from electricity per capita ................................................................... 13
CO2 emissions from Natural Gas per capita ................................................................ 13
Claimant count as a percentage of working age population ....................................... 14
Claimant count as a percentage of populations aged 16 to 24 years ......................... 14
Proportion of people earning less than the living wage .............................................. 15
Percentage of unemployed people assisted into work from Council programmes .... 16
Gross Value Added (GVA) per capita ........................................................................... 16
Immediately available employment land as a percentage of total land allocated for
employment purposes ................................................................................................. 17
Proportion of procurement spent on local enterprises .............................................. 17
Number of business gateway start-ups per 10,000 population .................................. 18
Town Vacancy Rates .................................................................................................... 19
Percentage of roads that should be considered for maintenance treatment ............ 20
Street Cleanliness Score ............................................................................................... 21
Proportion of total household waste arising that is recycled ..................................... 22
Proportion of the highest paid 5% of employees who are women ............................. 23
Gender Pay Gap ........................................................................................................... 23
Percentage of income due from Council Tax received by the end of year ................. 24
Percentage of invoices sampled that were paid within 30 days ................................. 24
Percentage of Scottish Welfare Fund Crisis Grant decisions made within one day .... 25
Percentage of Scottish Welfare Community Care Grant decisions made within 15
days .............................................................................................................................. 26
Percentage of operational buildings suitable for their current use ............................ 26

Page 60

Local Government Benchmarking Framework – April 2024 Analysis Page 1 of 26
Introduction
The Local Government Benchmarking Framework (LGBF) provides an opportunity to
benchmark our performance with other local authorities in Scotland.  It is administered by
the Improvement Service in partnership with the Society of Local Authority Chief Executives
(SOLACE) and highlighted within the Accounts Commission’s Statutory Performance
Information Direction 2021 which defines how local authorities should demonstrate they are
achieving Best Value for the people they serve.  As a result, several of the indicators are used
within our current 2023-28 Council Plan.  This report details our performance as at the data
released in April 2024, most of which relates to 2022/23.  
The LGBF brings together a range of 108 performance indicators covering nine key themes:
• Adult Social Care
• Children’s Services
• Corporate Services
• Culture and Leisure
• Economic Development
• Environmental Services
• Financial Sustainability
• Housing
• Tackling Climate Change
These can be explored in full using the LGBF Dashboard.
Our Approach
The Direction 2021 Statutory Performance Indicator 1 includes a requirement for our council
to report information that demonstrates how we are improving local services and local
outcomes.  This particularly relates to using the LGBF to enable comparison with similar
bodies and over time, linked to the desired outcomes agreed with our partners and
communities.  As such, the Direction 2021 gives scope to identify the key LGBF measures that
relate directly to our Council Plan priorities to help inform decision making.  Our Council Plan
2023-28 priorities are:

Page 61

Local Government Benchmarking Framework – April 2024 Analysis Page 2 of 26
The following LGBF PIs have been identified by the Corporate Policy and Performance Team
as relating directly to our Council Plan priorities.  This list is wider than the range of LGBF PIs
directly included in our Performance Management Framework (PMF) as they serve a slightly
different purpose.  The PMF function is to manage performance on a six-monthly basis using
frequent and immediate data.  The LGBF suite provides as close to a like for like comparison
as possible so is used to benchmark our performance and learn from others.
LGBF
Indicator
Group
PI Code Description Use
Children’s
Services CHN11 Percentage of pupils entering positive
destinations PMF
Children’s
Services CHN17 Percentage of children meeting developmental
milestones PMF
Children’s
Services CHN24 Percentage of children living in poverty (after
housing costs) PMF
Tackling
Climate
Change
CLIM1 CO2 emissions area wide per capita PMF
Tackling
Climate
Change
CLIM2 CO2 emissions area wide: emissions within
scope of LA per capita Benchmarking
Tackling
Climate
Change
CLIM3 CO2 emissions from Transport per capita Benchmarking
Tackling
Climate
Change
CLIM4 CO2 emissions from electricity per capita Benchmarking
Tackling
Climate
Change
CLIM5 CO2 emissions from Natural Gas per capita Benchmarking
Economic
Development ECON1
Percentage of unemployed people assisted into
work from council operated / funded
employability programmes
Benchmarking
Economic
Development ECON10
Immediately available employment land as a
percentage of total land allocated for
employment purposes in the local development
plan
Benchmarking
Economic
Development ECON11 Gross Value Added (GVA) per capita Benchmarking
Economic
Development ECON12a Claimant Count as a percentage of Working Age
Population Benchmarking
Economic
Development ECON12b Claimant Count as a percentage of population
aged between 16 and 24 years Benchmarking
Economic
Development ECON4 Percentage of procurement spend spent on
local enterprises Benchmarking
Economic
Development ECON5 Number of business gateway start-ups per
10,000 population Benchmarking

Page 62

Local Government Benchmarking Framework – April 2024 Analysis Page 3 of 26
LGBF
Indicator
Group
PI Code Description Use
Economic
Development ECON7 Proportion of people earning less than the real
living wage PMF
Economic
Development ECON9 Town Vacancy Rates Benchmarking
Environmental
Services ENV3c Street Cleanliness Score PMF
Environmental
Services ENV4b Percentage of A class roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV4c Percentage of B class roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV4d Percentage of C class roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV4e Percentage of unclassified roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV6 Percentage of total household waste arising
that is recycled PMF
Housing
Services HSN1b
Gross rent arrears (all tenants) as at 31 March
each year as a percentage of rent due for the
reporting year
PMF
Housing
Services HSN3 Percentage of council dwellings meeting
Scottish Housing Standards PMF
Housing
Services HSN5a Percentage of council dwellings that are energy
efficient PMF
Corporate
Services CORP 3b Percentage of the highest paid 5% of
employees who are women Benchmarking
Corporate
Services CORP 3c The gender pay gap (%) Benchmarking
Corporate
Services CORP 7 Percentage of income due from council tax
received by the end of the year PMF
Corporate
Services CORP 8 Percentage of invoices sampled that were paid
within 30 days Benchmarking
Corporate
Services CORP 9 Percentage of Scottish Welfare Fund Crisis
Grant decisions within one day Benchmarking
Corporate
Services CORP 10 Percentage of Scottish Welfare Fund
Community Care Grant decisions in 15 days Benchmarking
Corporate
Asset
CORP-
ASSET1
Percentage of operational buildings that are
suitable for their current use PMF
Analysis
Of the 33 LGBF PIs directly linked to our Council Plan 2023-2028 priorities, 25 have data for
2022/23.  It should be noted this April 2024 data release relates to a time period prior to the
current Council Plan, however the plan builds on progress made during the previous Council
Plan to drive immediate and longer-term sustainable improvements for our residents.  As a
result, the analysis of these PIs is still valid for this time period.

Page 63

Local Government Benchmarking Framework – April 2024 Analysis Page 4 of 26
During 2022/23 eight priority PIs were within the top quartile (32%) and six were within the
second quartile (24%).  Top quartile performance includes areas such as crisis grant
payments, proportion of pupils entering positive destinations, household waste recycling
and rent arrears.
Of the indicators with data 68% of our priority indicators demonstrate improved
performance in the short term (one year comparison of 25 PIs with data) and 4% remain
unchanged.  For the same number of PIs over the medium term (three years), 60% have
improved and 4% remain unchanged.  Long term (10 years) 93.75% of indicators have
improved (based on 16 PIs with comparable data).
Rank is naturally affected by other local authority performance and though useful as an
indication of relative performance, it cannot be viewed in isolation.  Over the short term, of
the 25 PIs with data, 52% have improved rank and 12 % have maintained their position.  For
the same number of PIs over the medium term, 64% have improved and 4% have
maintained their position.  Over the long term, where data is available for 16 of the PIs,
62.5% have improved and 6.25% have maintained their position.
Family Groups
Family groups enable local authorities to make as close to a like for like comparison as possible
with other councils by grouping those within similar traits depending on the indicator. 
Grouping is based on levels of deprivation (people services) or rurality (other services). 
Following a review in 2022/23 of previous LGBF reporting 2022/23, a more visual chart-based
approach and analysis focussing on family groups was adopted.  This more in-depth
consideration of each indicator is made possible by focussing on the indicators directly linking
to our priorities.
We will be using this information to actively benchmark through approaching other local
authorities to learn from their performance and/or gain context to their results.  In addition,
the Improvement Service is exploring the potential of a peer review system to support this
approach in future.
In the following charts, North Ayrshire Council’s performance is indicated by a thick dark blue
line.  For ease of viewing, only the data labels relating to North Ayrshire Council are included
in the graphs.  To support accessibility, a summary analysis is provided for each chart.  
Full details, including the meta data behind each measure which explains how it is captured,
is available through the LGBF Dashboard.

Page 64

Local Government Benchmarking Framework – April 2024 Analysis Page 5 of 26
People Services
This section provides an overview of North Ayrshire’s performance within our ‘People
Services’ Family Group.  This includes our priority indicators relating to Children, Social Work
and Housing.  Local authorities included in this comparison are:
• North Ayrshire Council
• Comhairle nan Eilean Siar 
• Dundee City Council 
• East Ayrshire Council 
• North Lanarkshire Council 
• Inverclyde Council 
• West Dunbartonshire Council 
• Glasgow City Council 
Proportion of children living in poverty (after housing costs) 
(Please note, the axis of this chart is 15% to 35% for clarity.)
Most recent child poverty statistics were released by Loughborough University and End Child
Poverty in June 2024 and are not covered in the LGBF data release (in the chart above).  The
June data states 29.2% of children are in poverty after housing costs (as at 2022/23) which is
0.2 percentage points higher than in 2021/22 and we remain second highest behind Glasgow
City Council (32.9%).  
The LGBF data release in the chart above relates to 2021/22 and shows an increase from
24.7% to 28.9% of children living in poverty.  However, due to changes in the methodology in
gathering this information during the Covid-19 pandemic, 2020/21 isn’t directly comparable
to other years.  
29.2% (2022/23) means approximately 7,181 of our children, young people and their families
may be struggling every day to access essentials such as food, sanitary products, clothing and
transport.

Page 65

Local Government Benchmarking Framework – April 2024 Analysis Page 6 of 26
Our Child Poverty and Cost of Living Board Chaired by the Leader of our council implements
our Child Poverty Strategy 2023-26.  The Board continues to coordinate whole systems
approaches where possible across our council, Health and Social Care Partnership, NHS
Ayrshire and Arran, third sector partners and our communities.  
Gross rent arrears (all tenants) as a percentage of rent due for the year
(Please note the axis for this chart is 0% - 10% for clarity)
The percentage of rent due for the year has increased from 6.63% in 2021-22 to 7.14% in
2022-23.  This is lower than other family group members, however the increasing trend has
continued since 2018-2019 and may be related to the cost-of-living crisis.  Only North
Lanarkshire is seeing a decrease in rent arrears during 2022-23.  Cost of living support is
available on our website (www.north-ayrshire.gov.uk) and is being supported across our
partners, led by our Child Poverty and Cost of Living Board.

Page 66

Local Government Benchmarking Framework – April 2024 Analysis Page 7 of 26
Proportion of children meeting developmental milestones
(Please note the axis for this chart is 70% - 90% for clarity)
This indicator relates to the proportion of children meeting developmental milestones as
reported by our Health and Social Care Partnership.  Along with East Ayrshire, Inverclyde and
North Lanarkshire within the family group, our performance has improved slightly from 2021-
22 moving from 78.73% to 79.53%.  Our Health and Social Care Partnership has lead
responsibility for Child Health services (including child immunisation and infant feeding). 
Details of the work undertaken by our Health and Social Care Partnership around child health
can be found in the North Ayrshire Health and Social Partnership's Annual Performance
Report 2022-2023.  
Proportion of pupils entering positive destinations
(Please note the axis for this chart is 90% - 100% for clarity)

Page 67

Local Government Benchmarking Framework – April 2024 Analysis Page 8 of 26
Data is sourced from Scottish Government School Leaver Attainment and Initial Destinations
information.  Though data is included for 11 years, the source data notes state due to changes
in the curriculum, trends over time may not be comparable.  
As detailed within our Education Service Improvement Plan we are designing tailored
programmes with partners to provide enhanced support for specific groups of school leavers,
including our young people with additional needs.  This will improve opportunities for
targeted learners to achieve and maintain an appropriate positive post-school destination.  
Proportion of council dwellings meeting the Scottish Housing Quality Standards
The energy efficient elements of the Scottish Housing Quality Standards were replaced by the
Energy Efficiency Standard for Social Housing (EESSH) that had to be met by landlords by 2020. 
The change in regulations reduced the testing period for electrical testing from every 10 years
to every five years and impacted on the reportable Scottish Housing Quality Standard (SHQS)
figures in 2021/22.  
Prior to this change we were reporting an SHQS figure of 97.36% in reporting year 2020/21. 
This reduced to 49.3% in 2021/22 due to the number of properties which immediately fell
outside the five-year testing period as a result of the targets when introduced.  An action plan
was developed and we have implemented several measures to meet the new targets to
ensure we progress towards 100% compliance in this area.  Our own performance is
improving at a faster rate than the national average, from 49.28% in 2021/22 to 63.24% in
2022/23 compared to the Scottish average of 68.5% and 70.9% respectively so progress is
being made in this area.

Page 68

Local Government Benchmarking Framework – April 2024 Analysis Page 9 of 26
Proportion of council dwellings that are energy efficient 
(Please note the axis for this chart is 60% - 100% for clarity) 
The proportion of council dwellings that are energy efficient remains high, with performance
improving slightly from 97.58% in 2020-21 to 97.66% in 2021-22.  This is the best performance
in our family group and higher than the Scottish average of 87.6%.

Page 69

Local Government Benchmarking Framework – April 2024 Analysis Page 10 of 26
Other Services
This section provides an overview of North Ayrshire’s performance within our ‘Other Services’
Family Group.  This includes indicators relating to Corporate Services, Culture and Leisure,
Economic Development, Environmental Services, Financial Sustainability and Tackling Climate
Change.  Local authorities included in this comparison are:
• North Ayrshire Council
• Perth and Kinross Council 
• S�rling Council 
• Moray Council 
• South Ayrshire Council 
• East Ayrshire Council 
• East Lothian Council 
• Fife Council 
CO2 emissions area wide per capita (tonnes) 
This measure looks at the CO2 emissions that are area-wide, not only in the scope of North
Ayrshire Council.  It is a contextual indicator that helps inform our approaches, however we
seek to lead where possible.  Tackling Climate Change a priority for our Council, with the aim
to become net zero by 2030.  
Four community renewable projects have been awarded funding through the Community
Renewable Energy Generation Fund, totalling approximately £130,000.  Additional awareness
raising activity is underway to increase the uptake of the available funding.
Education programmes for our young people in our schools and communities are ongoing. 
Our Sustainability Team has delivered 52 climate change and energy lessons to 22 primary
schools to date, with 10 schools visited between January and March 2024.  The lessons
support awareness of action on climate change and encourage action within schools through
their climate action plans.

Page 70

Local Government Benchmarking Framework – April 2024 Analysis Page 11 of 26
We also work with local businesses to support their just transition to net zero.  Our Business
Development team has supported 209 businesses during 2023/24 to help reduce their
environmental impact.  A large focus of this work has been through collaboration and delivery
of support including Net Zero Accelerator programmes and financial aid to adopt new
technology.  
CO2 emissions area wide emissions within scope of local authority per capita (tonnes) 
This measure shows the emissions within the control of North Ayrshire Council.  Over the long
term, all 32 local authorities have reduced their emissions over the past 11 years.  However
there has been an increase in CO2 emissions from 2020/21 to 2021/22 due to the Covid-19
restrictions easing and colder temperatures increasing the use of heating in buildings during
this period.  This is a UK wide trend.  
Locally, our Sustainable North Ayrshire Strategy 2024-27 was approved by Cabinet in
December, building on the significant progress made from the former strategy as listed in the
attached report.   Our Local Heat and Energy Efficiency Strategy and Delivery Plan were
published in January 2024 following approval by Cabinet.  These strategies provide a full
analysis and actions to reduce emissions in North Ayrshire.
Details of the range of activities being undertaken can be found in our Council Plan Year End
Progress Report 2023-24 accompanying this report.

Page 71

Local Government Benchmarking Framework – April 2024 Analysis Page 12 of 26
CO2 emissions from Transport per capita 
This indicator records the annual carbon dioxide emissions from Transport per capita (in
tonnes) in the local authority area.  It should be noted in this release of data (April 2024) due
to the use of inconsistent population estimates National Records Scotland (NRS) have advised
that the mid-2022 estimates should not be compared to years prior to 2021.  NRS are
undertaking work to revise mid-2011 to mid-2021 estimates to ensure comparability between
mid-2022 estimates and previous years.
North Ayrshire currently sits above the national average of 26.81 tonnes.  Only Moray Council
is higher with 35.31 tonnes in our family group.  We remain committed to helping our
residents and businesses transition to active travel with the adoption of our Local Transport
and Active Travel Strategy.  3,900m of active travel routes have been created or improved
during 2023/24.  We are also exploring community transport needs through our Community
Transport study.  
Our council is implementing our Fleet Decarbonisation Strategy to rationalise our fleet,
converting to lower carbon alternatives and avoiding travel where possible.  As at December
2023, we had 31 electric vehicles across our fleet.  We are also encouraging the use of electric
vehicles as we continue to develop the new Ayrshire Electric Vehicle Infrastructure Fund
pathfinder project which aims to bring £5 million public electric vehicle charging investment
into Ayrshire to deliver an additional 307 new electric vehicle chargers.

Page 72

Local Government Benchmarking Framework – April 2024 Analysis Page 13 of 26
CO2 emissions from electricity per capita 
This indicator records the annual carbon dioxide emissions from electricity per capita (in
tonnes) in the local authority area.  As detailed above, there is work ongoing to make the
population figures used for this indicator consistent to support trend analysis.
North Ayrshire currently sits above national average of 46.05 tonnes, recording 48 tonnes,
with only Fife Council higher in our family group with 49.48 tonnes. 
CO2 emissions from Natural Gas per capita 
This indicator records the annual carbon dioxide emissions per capita (in tonnes) in the local
authority area.  As detailed above, there is work ongoing to make the population figures used
for this indicator consistent to support trend analysis.
North Ayrshire currently sits above the national average of 57.22 tonnes.  We currently have
the highest natural gas emissions within our family group.

Page 73

Local Government Benchmarking Framework – April 2024 Analysis Page 14 of 26 
Claimant count as a percentage of working age population 
North Ayrshire had the highest claimant count rates as a percentage of working age
population within our family group 2023-24.  From 2020/21 we have seen an improvement
as we emerge from the pandemic.  This decline in claimant counts from 2020/21 can be seen
across the family group although the rate of improvement is beginning to reduce to pre
pandemic levels.  This measure is contextual and wider than the impact our council alone can
influence.  However, our Employability Service continues to support people into work with
475 people supported during 2023/24.  We also work with anchor institutions through our
Community Wealth Building Strategy to improve employment opportunities in North
Ayrshire.  More specific initiatives aimed at the younger workforce are detailed below.
Claimant count as a percentage of populations aged 16 to 24 years

Page 74

Local Government Benchmarking Framework – April 2024 Analysis Page 15 of 26
North Ayrshire had the highest claimant count as a percentage of population aged 16 to 24
years within our family group.  Similar to claimant count rates as a percentage of working age
population, performance has improved since the lock down periods of the Covid-19 pandemic
in 2020/21, however from 2022/23, there has been an increase from 5.33% to 5.59%.  This is
more in line with pre-pandemic figures.  Though this indicator is much wider than our
council’s sphere of influence, work continues on our Modern Apprenticeship and Skills for Life
programmes which support those aged up to 24 years into employment.   
Proportion of people earning less than the living wage 
(Please note the axis for this chart is 0% - 30% for clarity) 
The proportion of people earning less than the living wage is continuing to decrease in North
Ayrshire.  Currently only East Ayrshire Council is performing better within our family group
(9.20%).  At 11.7% for 2021-22, we are performing better than the Scottish average of 14.4%. 
We are currently ranked 5th across all Scottish local authorities in this area.  As detailed above,
the implementation of our Community Wealth Building Strategy is key to working with
partners to improve performance in this area and directly links to addressing child poverty in
North Ayrshire.

Page 75

Local Government Benchmarking Framework – April 2024 Analysis Page 16 of 26
Percentage of unemployed people assisted into work from Council programmes 
(Please note the axis for this chart is 0% - 30% for clarity) 
The percentage of unemployed people assisted into work from our employability
programmes has decreased from 24.13% to 19.41% from 2021-22 to 2022-23.  This measure
can be impacted by how far an individual is from gaining skills required to obtain employment,
as well as the current unemployment rate.  
Gross Value Added (GVA) per capita 
Gross Value Added (GVA) is something we can help influence as a local authority; however, it
relies on all industry within North Ayrshire and is monitored for context.  Currently North
Ayrshire has a GVA of £18,127 which is an improvement from 2021-22 and part of a long-term
positive trend.  This is below the family group average of £20,886 and the national average of
£27,039.

Page 76

Local Government Benchmarking Framework – April 2024 Analysis Page 17 of 26
Immediately available employment land as a percentage of total land allocated for
employment purposes 
In North Ayrshire, we have a greater amount of currently available employment land as a
percentage of total allocated employment than other local authorities in our family group
(15.3%) and the Scottish Average (22.8%).  It is important to balance the amount of land
available with demand, by having immediate availability it gives greater opportunities for
inward investment.  We are currently have the 7th highest availability in Scotland.
Proportion of procurement spent on local enterprises 
(Please note the axis for this chart is 0% - 40% for clarity) 
This indicator is a useful comparison for benchmarking purposes; however, it does not
capture all spend as detailed in our 2020/21 Mid-Year Council Plan Progress Report.  “The
LGBF calculation excludes certain spend, most notably it excludes all suppliers spend below
£1,000 and excludes all suppliers not categorised as core trade organisations.  This is
therefore not an accurate reflection of the economic activity within North Ayrshire.  As we
have access to the source data used by the LGBF we are able to capture all spend data and

Page 77

Local Government Benchmarking Framework – April 2024 Analysis Page 18 of 26
refine the calculation at a local level to better capture our spend with local enterprises and
shorten the time delay in reporting.”
Performance has improved over recent years, with 24.1% of procurement spend on local
enterprises according to LGBF calculations.  Local calculations show procurement spend is
26.04% as at 2022/23, with 2023/24 results expected in July.
Number of business gateway start-ups per 10,000 population 
The most recent data available as at September 2023 shows the number of business gateway
start-ups per 10,000 population is seven.  Though this is a decrease on the previous year, it is
a trend reflected elsewhere due to economic conditions.  Though business startups are
welcomed, it is the sustainability of these businesses that is important to maintain
employment and support our economy.

Page 78

Local Government Benchmarking Framework – April 2024 Analysis Page 19 of 26
Town Vacancy Rates 
Town vacancy rates have reduced to 7% which is the lowest in our family group and below
the national average of 12%.  This is the first time we have performed below the national
average since 2017/18.  Town vacancy rates are a measure of the performance of our town
centres and cannot be viewed in isolation.  A suitable mix of various retail and service
organisations in our towns is crucial to support ongoing regeneration.

Page 79

Local Government Benchmarking Framework – April 2024 Analysis Page 20 of 26
Percentage of roads that should be considered for maintenance treatment

Page 80

Local Government Benchmarking Framework – April 2024 Analysis Page 21 of 26
The percentage of roads that should be considered for maintenance treatment is shown in
the four charts on the previous page and reflects the mixture of rural and urban areas in North
Ayrshire.  The requirement for maintenance remained relatively constant over the past there
years.  Please note, these are two-year rolling averages.  Most recent information from our
Council Plan Year End Progress Report 2023-24 shows 32.5% of our road network overall
should be considered for maintenance treatment, slightly lower than previous years and
within the target of 34.8%.  
Street Cleanliness Score 
(Please note the axis for this chart is 60% - 100% for clarity) 
Street cleanliness was impacted by the pandemic as resources were diverted to other services
such as waste collection.  Most recent data available within our Council Plan Year End Progress
Report 2023/24 shows this has improved, with a provisional figure of 89.1%, above our year
end target of 87% as at 2023/24.

Page 81

Local Government Benchmarking Framework – April 2024 Analysis Page 22 of 26
Proportion of total household waste arising that is recycled 
(Please note the axis for this chart is 60% - 100% for clarity) 
The draft calculations for the 2023 recycling performance have been submitted to SEPA and
are subject to verification so may change prior to issuing in October 2024.  The estimated
household waste recycling performance for the calendar year 2023 is estimated to be 56.1%,
an improvement on the published 2022/23 figure of 55%.  A new Zero Waste Strategy is being
developed during 2024 to explore the potential opportunities for improving reuse and
recycling performance.
We participate in the Clyde Valley Residual Waste Contract.  Our council and four partnering
councils (East Dunbartonshire, East Renfrewshire, North Lanarkshire and Renfrewshire) are
converting non-recyclable / residual waste into energy.  More details can be found in this
video Turning waste into energy - North Ayrshire Council - YouTube

Page 82

Local Government Benchmarking Framework – April 2024 Analysis Page 23 of 26
Proportion of the highest paid 5% of employees who are women 
(Please note the axis for this chart is 60% - 100% for clarity) 
There is an overall long-term positive trend in this area, increasing from 61.17% to 61.30%
over the last reporting period.  
Gender Pay Gap 
Our Gender Pay Gap has continued its gradual decline from 2018/19 reducing from 2.81% to
1.09%.  Work continues to minimise horizontal and vertical segregation in our workplace.

Page 83

Local Government Benchmarking Framework – April 2024 Analysis Page 24 of 26
Percentage of income due from Council Tax received by the end of year 
North Ayrshire Council continues to perform least well within our family group, with Perth
and Kinross Council having the strongest performance with 98.40% of income due from
Council Tax received by the end of year compared to 94.74% for North Ayrshire.  However,
performance has improved since 2021/22 (93.34%).  This represents £61.3 million out of
£64.7 million (excluding relief and rebates) of Council Tax owed in 2022/23.  We are currently
ranked 29th out of the 32 local authorities.  
Percentage of invoices sampled that were paid within 30 days

Page 84

Local Government Benchmarking Framework – April 2024 Analysis Page 25 of 26
North Ayrshire Council has the second strongest performance within our family group with
93.31% invoices sampled paid within 30 days.  The highest performing was South Ayrshire
with 94.45%.  We are currently ranked 11th in Scotland for the speed of our payments.  
Percentage of Scottish Welfare Fund Crisis Grant decisions made within one day 
The most recent data related to the end of September 2023 when 99% of Scottish Welfare
Fund Crisis Grant decisions were made within one day.  This is equal to East Ayrshire, Fife and
Perth and Kinross councils.  This is above the Scottish average of 93.5%.  We are currently 7th
in Scotland.  
During 2022/23, 3,605 crisis grants were paid to our residents.  Work is ongoing through the
Council Plan and Child Poverty Action Plan alongside our partners in the public, private and
third sector to support our residents to obtain more stable financial support through
employment, maximising income and reducing household costs.

Page 85

Local Government Benchmarking Framework – April 2024 Analysis Page 26 of 26
Percentage of Scottish Welfare Community Care Grant decisions made within 15 days 
The most recent data related to the end of September 2023 when 99% of Scottish Welfare
Fund Community Care Grant decisions were made within 15 days.  This is the third highest
within our Family Group behind only East Ayrshire and East Lothian.  This is above the Scottish
average of 86%.  We are currently ranked 10th in Scotland.  
Percentage of operational buildings suitable for their current use 
95.1% of our operational buildings are suitable for their current use.  This is higher than the
family group average of 89.9% and the Scottish average of 86.1%.  Moray Council continues
to perform the strongest in this area likely due to having considerably fewer operational
buildings, 160 as at 2022/23.  Whereas the number of operational buildings in North Ayrshire
is 247.

Page 86

Local Government Benchmarking Framework – April 2024 Analysis Page 27 of 26 
We strive to make our reporting as accessible as possible.  If you have any
questions or require further information on our council’s performance please
contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance