Democracy Spraffa

Agenda Document Pack - Cabinet - 04/06/2024

North Ayrshire Council · 4 June 2024
Back to Cabinet — 4 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Cabinet 
A Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
04 June 2024 at 14:30 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 30 April
2024 will be confirmed and the Minutes signed in accordance with
Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland) Act
1973 (copy enclosed). 
3 Third Church Representation on Cabinet (Education)
Submit a report by the Head of Service (Democratic Services) to advise
Cabinet of the resignation of Reverend Mark Goodman as the Third
Church representative on Cabinet when it considers Education business
(copy enclosed).            
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
EDUCATION ITEMS FOR DECISION 
4 Attainment Update 2023
Submit a report by the Head of Service (Education) (i) Curriculum for
Excellence attainment levels in literacy and numeracy for 2022-23; and
(ii) the overall performance of the 2022-23 North Ayrshire Council school
leavers as highlighted in the INSIGHT benchmarking tool. (copy
enclosed). 
5 Education Achievement of Care Experienced Learners in North
Ayrshire 2023
Submit a report by the Head of Service (Education) to provide an update
on: (i) Curriculum for Excellence Broad General Education (BGE)
attainment levels of care experienced learners in 2022; (ii) Senior Phase
attainment of care experienced school leavers in 2023; (iii) post-school
participation of care experienced learners (copy enclosed). 
6 Play Pedagogy in the Early Stages of Primary
Submit a report by the Head of Service (Education) provide Cabinet with
information on the current and proposed approach to play pedagogy in
primary school establishments (copy enclosed).  
GENERAL BUSINESS FOR DECISION  
Reports by the Chief Executive 
7 Firework Control Zones
Submit a report by the Head of Service (Democratic Services) to update
Cabinet on the progress made with regard to the new discretionary
powers to designate Firework Control Zones and seek Cabinet’s approval
for the proposed process for handling community requests (copy
enclosed). 
8 Revenue Budget 2023/24: Financial Performance to 31 March 2024
Submit a report by the Head of Finance to advise of the financial
performance for the Council at 31 March 2024 (copy enclosed). 
9 Capital Programme and Treasury Management Performance to 31
March 2024
Submit a report by the Head of Finance to advise of progress in
delivering the Capital Investment Programme 2023/24 and the associated
Treasury Management performance to 31 March 2024 (copy enclosed).  
Reports by the Director (Health and Social Care Partnership) 
10  Children's Services Annual Performance Update 2023-24
Submit a report by the Director (Health and Social Care Partnership) to
seek approval for the North Ayrshire Children’s Services Performance
Update 2023-24 (copy enclosed). 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
11  Brighter Pathways: Remodelling Care Options
Submit a report by the Director (Health and Social Care Partnership) to
note the programme of work and current pressures on placement
availability and alternative care for any child and young person in the
looked after system (copy enclosed).  
Reports by the Executive Director (Communities and Housing) 
12  Participation Strategy and Locality Planning Update
Submit a report by the Executive Director (Communities and Housing) to
seek Cabinet approval of the proposed North Ayrshire Participation
Strategy; and provide an update on proposed next steps in relation to
North Ayrshire’s locality planning approach to support the implementation
of the strategy (copy enclosed). 
13  Proposals for Community Investment Fund (CIF) Expenditure
Submit a report by the Executive Director (Communities and Housing) to
determine applications by Locality Partnerships to allocate CIF funding to
proposed projects (copy enclosed).  
Reports by the Executive Director (Place) 
14  North Ayrshire Visitor Management Plan 2024
Submit a report by the Executive Director (Place) to seek approval for the
North Ayrshire Visitor Management Plan 2024 (copy enclosed). 
15  Strathclyde Partnership for Transport - Strathclyde Regional Bus
Strategy – Consultation on the Recommended Options for Improving
our Future Bus Network
Submit a report by the Executive Director (Place) to seek approval for the
proposed North Ayrshire Council submission to Strathclyde Partnership
for Transport consultation on the “Recommended Options for Improving
our Future Bus Network” (copy enclosed). 
16  North Ayrshire Burial Grounds
Submit a report by the Executive Director (Place) to provide an update on
the review of burial grounds capacity and future provision of cemeteries
in North Ayrshire (copy enclosed). 
17  Urgent Items
Any other items which the Chair considers to be urgent.
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
4

Page 5

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Cabinet Sederunt 
Elected Members 
Marie Burns (Chair)
Shaun Macaulay (Vice-Chair)
Tony Gurney
Alan Hill
Margaret Johnson
Christina Larsen 
Church Representatives 
Mr Andrew Bruce
Ms Elizabeth Turbet
Teaching Representative 
Ms Jacqui MacKenzie 
Youth Council Representatives 
Chair: 
Apologies: 
Attending: 
5

Page 6

6

Page 7

Cabinet
30 April 2024 
IRVINE, 30 April 2024 - At a Meeting of the Cabinet of North Ayrshire Council at
2.30 p.m. 
Present
Marie Burns, Tony Gurney, Margaret Johnson and Shaun Macaulay, 
In Attendance
R. McCutcheon, Executive Director (Place); D. Hammond, Executive Director, R.
Leith, Head of Service (Communities and Housing); C. Cameron, Director, T.
Bowers (Head of Service (Mental Health) (Health and Social Care Partnership); A.
McClelland, Head of Service (Education); M. Boyd, Head of Service, (Finance), F.
Walker, Head of Service (People & ICT) (Chief Executive’s Service); and A. Craig,
Head of Service, I. Hardy, Team Manager (Policy and Performance), M. Sugden,
Communications Officer (Communications) H. Clancy, and C. Stewart, Committee
Services Officers (Democratic Services). 
Apologies
Alan Hill and Christina Larsen 
Chair
Marie Burns in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting of the Cabinet held on 19 March 2024 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the
Local Government (Scotland) Act 1973. 
3. Ayrshire Shared British Sign Language Plan (BSL) 2024 – 2030 
Submitted a report by the Head of Service (Democratic Services) on the Council’s
partnership approach to developing and implementing the Ayrshire Shared British
Sign Language Plan (BSL) 2024 – 2030 with the Plan set out at Appendix 1 to the
report. 
The Cabinet agreed to approve the Ayrshire Shared British Sign Language Plan (BSL)
2024 – 2030 set out at Appendix 1 to the report. 
4. Proposals for Community Investment Fund (CIF) Expenditure 
Submitted a report by the Executive Director (Communities and Housing) to determine
applications by Locality Partnerships to allocate CIF funding to proposed projects with
the Application set out at Appendix 1 to the report. 
Agenda Item 2
7

Page 8

The Cabinet agreed to approve the CIF application in relation to the Largs Scottish
Women’s Institute (SWI) set out at Appendix 1 to the report. 
5. Armed Forces Covenant Duty 
Submitted a report by the Director (Health and Social Care Partnership) on the new
Armed Forces Covenant Duty 2021. The Statutory Guidance on the Armed Forces
Covenant Duty was set out at Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: 
• the range of services in place to support veterans including the Veterans First
Point that provides a central point in North Ayrshire for veterans to access a
wide range of services and support and connects with local community groups;
and
• further information and updates from the National Advisory Group established
to provide oversight to the Veterans Mental Health and Wellbeing pathway. 
The Cabinet agreed to note (i) the new Armed Forces Covenant Duty and the
Statutory guidance in respect of the new Act and; (ii) how the Council has responded
to its obligations under the new Act and guidance with the current support provided to
the Armed Forces and Veterans. 
6. Review of early learning and childcare (ELC) hourly rate for funded
providers
Submitted a report by the Head of Service (Education) to further increase the
sustainable rate of payment to funded providers of early learning and childcare
(ELC) in North Ayrshire. 
The Cabinet agreed to (i) a revised increase in the current hourly rate paid by the
Council to funded providers from 1st of April 2024; and (ii) receive a further report in
advance of the next annual review of the sustainable rate for funded providers. 
7. Urgent Items 
There were no urgent items. 
The meeting ended at 2.50 p.m.
8

Page 9

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet 
Title:    Third Church Representation on Cabinet (Education) 
Purpose:  To advise Cabinet of the resignation of Reverend Mark
Goodman as the Third Church representative on Cabinet when
it considers Education business. 
Recommendation:  That the Cabinet agrees to (a) note the resignation of Reverend
Mark Goodman from Cabinet; and (b) advertise for the vacancy
of Third Church representative to consider Education business. 
1. Executive Summary 
1.1 This report notes the resignation of Reverend Mark Goodman as a religious
representative on Cabinet. It seeks to commence the process to fill the vacancy of the
Third Church representative on Cabinet. 
2. Background 
2.1 The Council’s Scheme of Administration reflects the provision within Section 124 of the
Local Government (Scotland) Act 1973, as amended by Section 31 of the Local
Government Etc. (Scotland) Act 1994, in respect of the appointment of three persons
interested in the promotion of religious education to serve on the Council’s Cabinet
when it meets to consider Education business. 
2.2 At the Cabinet meeting on 23 August 2022, Reverend Mark Goodman was appointed
as the Third Church representative. Reverend Goodman has now resigned and is
stepping down from this role. A public notice to fill this vacancy on Cabinet will be
placed in the local press for a period of one week. 
3. Proposals 
3.1 It is proposed that the Cabinet agrees to (a) note the resignation of Reverand Mark
Goodman from Cabinet; and (b) advertise for the vacancy of Third Church
representative to consider Education business. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None.
Agenda Item 3
9

Page 10

Human Resources 
4.2 None. 
Legal 
4.3 Section 124 of the Local Government (Scotland) Act 1973, as amended by Section 31
of the Local Government Etc. (Scotland) Act 1994, provides for the appointment of three
religious representatives to serve on the Cabinet. 
Equality/Socio-economic 
4.4 The appointment of religious representatives in the Education functions of Cabinet
allows for religious involvement in decisions relating to the education of children and
young people. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 None. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 A public notice will be placed in the local press for a period of one week. 
Aileen Craig
Head of Service (Democratic Services) 
For further information please contact Shannon Wilson, Committee Services Officer, on
shannonwilson@north-ayrshire.gov.uk. 
Background Papers
0
10

Page 11

NORTH AYRSHIRE COUNCIL 
4 June 2024   
Cabinet (Education) 
Title:    School Attainment Results 2023 
Purpose:  To update Cabinet on: (i) Curriculum for Excellence attainment
levels in literacy and numeracy for 2022-23; and (ii) the overall
performance of the 2022-23 North Ayrshire Council school
leavers as highlighted in the INSIGHT benchmarking tool. 
Recommendation:  That Cabinet:   
a) Notes the content of the report, including the progress being
made by learners, specifically in literacy and numeracy;
b) Notes the achievements of school leavers in SQA
examinations in 2023; and
c) Notes the measures being taken to make further
improvements to attainment and achievement levels across
all schools. 
1. Executive Summary 
1.1 North Ayrshire Council has high aspirations for all and is committed to securing
improved educational outcomes for all children and young people. Two of the current
five strategic priorities for the Education Directorate are directly linked to raising
attainment: 
• Improvement in attainment, particularly in literacy and numeracy
• Closing the attainment gap between the most and least disadvantaged children
and young people
This report provides an update on ACEL data in 2022-23 and Insight School Leavers
data published in February 2024 for 2022-23. 
1.2 Highlights include:
North Ayrshire Council ‘reducing the poverty-related attainment gap’ data for Literacy
has improved by 4 % points between 2021/22 and 2022/23 and for Numeracy by 2 %
points.  
1.3 North Ayrshire school leavers recorded their highest ever positive destination figure in
the last 5 years with 96.5% achieving an initial positive destination.
1.4 At 94.9%, the percentage of S4 leavers achieving Level 3 Numeracy is the highest in
the last 5 years 
Agenda Item 4
11

Page 12

1.5 The lowest 20% of S4 school leavers have achieved the highest amount of tariff points
in the last 5 years and is above the Virtual Comparator. 
1.6 NAC School leavers from SIMD 3 and 4 are exceeding the performance of school
leavers from similar backgrounds nationally. 
2. Background 
2.1 The current cost of living crisis and other post-covid factors may have impacted young
people’s decisions of when to leave school and their subsequent destinations and may
continue to do so for a number of years. 
2.2 All key benchmarking data is now available for schools and local authorities as they
move into the improvement planning cycle and look ahead to session 2024-25.
Improvement plans for next session will take full account of the messages found from
analysing and reflecting upon ACEL and Insight data, with a view to seeking
improvements in outcomes for children and young people annually until they leave
school. 
2.3 Attainment in Broad General Education – Attainment of Curriculum for Excellence
Level (ACEL) in P1, P4, P7 and S3 (These highlights are supported by charts in
Appendices….) 
2.3.1 In 2016, the Scottish Government began to collect statistics on the Curriculum for
Excellence level achieved in Literacy (Listening and Talking, Reading, Writing) and
Numeracy by learners in the Broad General Education stages P1, P4, P7 and S3. This
is based on teacher judgement about each pupil’s achievement of expected level made
at the end of June each session. This data collection by the Scottish Government was
suspended in 2020 for all schools due to the impact of the pandemic. Data collection
was resumed in 2021 for stages P1, P4 and P7 though not S3. In 2022 all stages were
once again collected. 
Schools submit data for the following learner stages:
• Primary 1
• Primary 4
• Primary 7
• Secondary 3 
The submitted school level data is aggregated by the Scottish Government to produce
a Local Authority aggregate and it is this dataset that forms the basis for this report. 
2.3.2 For the purposes of this paper, *Primary data combines Primary 1, 4 and 7 CfE
attainment. 
Expected levels, relevant to stage: - 
CfE Level Stage Description
12

Page 13

Early P1 The final two years of early learning and childcare before a
child goes to school and P1, or later for some.
First P4 To the end of P4, but earlier or later for some.
Second P7 To the end of P7, but earlier or later for some.
Third/Fourth S3 To the end of S3, but earlier or later for some.
*Learners who have been entered as ‘Not Assessed’ are not included in the percentage calculations. 
Pupils recorded as ‘Pupils following Individual Milestones’ are included in the percentage calculations. 
2.3.3 Achievement of a level of CfE levels is judged based on a holistic view of a child’s
achievements by their teacher across a range of evidence throughout their journey
through the level.  As part of a school’s quality assurance process, teacher judgement
levels are moderated internally and, in some cases, externally across school clusters,
for example. 
2.3.4  Raising attainment is an ongoing priority for the Education Directorate with a number
of initiatives already in place to support schools.  During session 2022/23, schools
were supported in their recovery journey through the offer of professional learning in
key areas to support raising attainment in literacy and numeracy. Improvement
projects included: 
• Launch of new NAC Learning & Teaching policy to all establishments
• Delivery of training & CLPL by our professional Learning Academy to class
teachers and classroom assistants to support high quality learning & teaching in
listening & talking, reading, writing and numeracy.
• Implementation of the ELC Outdoor Learning Strategy across NAC
• Working in partnership across the local authority, SWEIC and national networks to
support sharing of highly effective practice that reduces the poverty related
attainment gap.   
2.3.5 Developing pedagogy was another area of focus to develop the robustness of data
and teacher professional judgement (TPJ). Specific input was provided on: 
• Extension of play pedagogy from early years into Primary 1 and 2, through a pilot
programme in identified schools.
• Refresh & facilitation of a new Head Teacher/Head of Centre induction/ mentoring
programme
• Enhancement of our probationer mentor support programme to include coaching
approaches to the leadership of probationers
• Evaluation and update of the PRD process and paperwork 
2.3.6 Summary of results 
Appendix 5 presents the detailed attainment of each stage in each of the Literacy
components and in Numeracy, for the past 5 years minus 2020 which was not recorded. 
2.3.7 Primary Literacy 
• In 2022/23, 68.45% of children in North Ayrshire Council achieved the appropriate
attainment level in Literacy.
• North Ayrshire Council performance has improved by 1.16 percentage points
between 2021/22 and 2022/23.
• At national level, 72.7% of children achieved the appropriate level of Literacy, with
an increase of 2.2 percentage since points2021/22.
13

Page 14

• North Ayrshire Council ‘reducing the poverty-related attainment gap’ data for
Literacy has improved by 4 percentage points between 2021/22 and 2022/23. 
2.3.8 Primary Numeracy 
• In 2022/23, 75.8% of children in North Ayrshire Council achieved the appropriate
attainment level in Numeracy.
• North Ayrshire Council performance has improved by 0.33 percentage points
between 2021/22 and 2022/23.
• At national level, 79.6% of children achieved the appropriate attainment level in
Numeracy, with an increase of 2.3 percentage points since 2021/22.
• North Ayrshire Council ‘reducing the poverty-related attainment gap’ data has
improved by 2 percentage points between 2021/22 and 2022/23. Data shows that
those Local Authorities where there are higher levels of deprivation demonstrate
lower increase in attainment in Literacy and Numeracy since 2020/21. 
2.4 School Leavers – Insight – 2022-23
North Ayrshire Council Education Directorate Data Team sends all 9 Secondary schools
their Insight Analytical Data set each year which empowers schools to inspect their
leavers’ data at a learner level. The contextual and circumstantial understanding that
schools possess regarding their learners coupled with this dataset can allow patterns
and trends for groups of leaners to be identified that is not possible by solely using
Insight. Consequently, schools can utilise this information for future improvement
planning.  The most recent update of Insight affords the opportunity to explore how well
young people leaving school have attained, in the five years to 2023. 
2.4.1 The time period covered by these statistics means that the results will be affected by
the coronavirus (COVID-19) pandemic. In particular, the cancellation of exams and
external assessment of coursework in 2020, and the use of the Alternative Certification
Model in 2021, will have affected the attainment of many 2020-21 school leavers. It is
also likely that the pandemic will have continued to affect the destination choices made
by, and opportunities available to, some school leavers in 2022-23. 
2.4.2 The impact of these different approaches to certification upon school leaver attainment
means that care should be taken when making comparisons over time, particularly
when comparing 2019/20 and 2020/21 with previous or subsequent years. Any
comparisons between the attainment levels of these two cohorts with other session
cohorts should not be seen as an indication that performance has improved or
worsened, without further evidence. A brief explanation of why this is the case can be
found in 2.7. 
2.4.3 Levels of attainment by 2020-21 school leavers are also likely to have been affected by
any changes to learners’ decisions on staying on at school related to the pandemic. The
relative size and make-up of the 2019-20 school leaver cohort indicated that fewer S4
or S5 learners left school in 2019/20 than might have been expected. These pupils,
many of whom are likely to have left in 2020-21, will have had opportunities to gain
more qualifications, and/or to gain qualifications at a higher level, than had they left at
the end of the 2019/20 academic year. This is likely to have affected the total number
of passes, and the highest level of qualification, attained by some school leavers in
2020-21. 
14

Page 15

2.5 National Benchmarking Measures 
One of the functions of Insight is to provide an analysis of four national benchmarking
measures showing the performance of pupils at the point of exit from school. This
provides a consistent benchmark and emphasises that attainment and achievement in
S4 to S6 are cumulative. These measures are connected and should be looked at
together when considering the performance of a school or local authority and the next
steps to be taken in seeking further improvements. 
2.5.1 The four National Benchmarking Measures are: 
- Improving attainment in literacy and numeracy 
Our aim is for all our school leavers to be highly literate and numerate, increasing their
life chances greatly. 
Curriculum for Excellence stresses the responsibility of all teachers for developing
literacy and numeracy skills. This reflects the importance placed on these crucial skills
which unlock learning in all other areas of the curriculum and are vital for success in
learning, life and work in the modern world and workplace.
- Improving attainment for all
The overall aim for this measure, along with tackling disadvantage, is to have our pupils
attain as highly as possible 'across the board'. 
Attainment is an individual’s passport to personal, social, cultural and economic
opportunities. Raising attainment means improving life chances. This does not mean
just focusing on exam results, but instead looking at attainment in its widest sense. It is
this rich attainment which enables all of our children and young people to make good
progress and develop the skills, ambition, and know-how they need to improve life
chances. 
- Tackling disadvantage by improving the attainment of lower attainers relative
to higher attainers 
The overall aim for this measure, together with improving attainment for all, is to have
our pupils attain as highly as possible 'across the board'. 
This measure is aimed at reducing the gap in attainment associated with the
incidence of higher and lower deprivation and has the same aspirations for our
learners as improving attainment for all. 
- Increasing post-school participation 
Considering the destinations of our leavers is a vital part of ensuring that Curriculum
for Excellence is a success in our schools. The measure focuses on initial
destinations and is linked with Skills Development Scotland's information. 
2.5.2 This briefing considers the position of North Ayrshire Council over time and, where
possible, in relation to a ‘virtual’ comparator authority and the national position for each
of the measures. Additionally, where available, data relating to performance in the
South West Educational Improvement Collaborative has been included for comparison. 
15

Page 16

2.5.3 Virtual comparator (VC) data is constructed from the performance of individual pupils
with similar characteristics from schools in other local authorities. For every pupil in a
North Ayrshire school, 10 similar pupils are identified from across all schools in other
local authorities to be part of the virtual comparator’s data. This allows a comparison
based on some key pupil characteristics (gender, deprivation (SIMD decile), additional
support needs and stage of leaving) that are linked to educational outcomes. 
2.5.4 The following terms of quantity are used in this report: 
Other quantitative terms used in this report are to be understood as in common English
usage. 
2.6 Summary of School Leavers’ results 2022-23: Improving attainment in literacy
and numeracy 
All Leavers Achieving Literacy (appendix 3)   
Level 4
- 94.5% of NAC school leavers achieved Level 4 literacy, the lowest percentage since
2019 but still above the VC
- Almost all school leavers achieved Level 4 literacy 
Level 5
- At 81.5%, NAC is above the VC by nearly 2 percentage points
- NAC remains above the VC for the 5th year since 2019
- Most leavers achieved Level 5 Literacy. 
2.6.1 Percentage of S4 Leavers Achieving Literacy 
Level 3
- 94% of S4 leavers achieved Level 3 Literacy – this is the highest percentage in the
last 5 years
- North Ayrshire has improved by 5 percentage points since 2021-22 and is 6.8
percentage points above the VC which is the highest since 2019
- Almost all S4 leavers achieved Level 3 Literacy 
Level 4
- At 84.3%, North Ayrshire Council is above the VC and is 3.5% points above the last
highest % in 21-22 (80.8%)
- Most S4 leavers achieved Level 4 Literacy
16

Page 17

Level 5
- At 45.8%, North Ayrshire Council is above the virtual comparator which has been
the case since 2019 and is the second highest percentage in the last 5 years
- Less than half of S4 leavers achieved Level 5 Literacy 
2.6.2 Percentage of S5 Leavers Achieving Literacy 
Level 5
- At 71.9%, North Ayrshire Council is above the virtual comparator which has been
the case since 2019
- This is the second lowest percentage since 2019-20
- The majority of S5 leavers achieve Level 5 Literacy 
2.6.3 Percentage of All Leavers Achieving Numeracy (Appendix 3) 
Level 4
- 91.5% of all leavers achieved Level 4 Numeracy and this is the second highest
percentage since 2019-20
- North Ayrshire Council has been above the VC for the past 2 years
- Almost all leavers achieved Level 4 Numeracy 
Level 5
- 69.3% of all leavers achieved Level 5 Numeracy, which is above the VC, but is the
second lowest percentage since 2018-19
- North Ayrshire Council has been above the VC for the past 5 years
- The majority of leavers achieved Level 5 Numeracy 
2.6.4 Percentage of S4 Leavers Achieving Numeracy 
Level 3
- At 94.9%, the percentage of S4 leavers achieving Level 3 Numeracy is the highest
in the last 5 years and has been consistently above the VC
- This represents a 3-year trend of improvement since 2020-21 with an increase of
10.5percentage points. 
- Almost all S4 leavers achieved Level 3 Numeracy 
Level 4
- 79.2% of S4 leavers achieved Level 4 Numeracy which is the highest percentage in
the past 5 years
- With the exception of 2020-21, NAC has been above the VC
- Most S4 leavers achieved Level 4 Numeracy 
Level 5
- At 38.4%, the percentage of S4 leavers achieving Numeracy at Level 5 is the highest
percentage in the last 5 years
- This figure is almost 10 percentage points above the VC
- Less than half of S4 leavers achieved Level 5 Numeracy 
2.6.5 Percentage of S5 Leavers Achieving Numeracy
17

Page 18

Level 5
- 52.3% of S5 leavers achieved Level 5 Numeracy which is above the VC
- This is the second lowest percentage since 2019-20
- The majority of S5 leavers achieved Level 5 Numeracy 
2.7 Improving attainment for all (Appendix 4) 
This measure provides information on the average complementary tariff score of school
leavers in three groups: the lowest 20%, middle 60% and highest 20% based on
attainment. 
The total tariff score sums all tariff points awarded to a candidate across all of their
courses for that academic year. The complementary tariff score sums tariff points
awarded to a candidate across their 5 best performances (courses) for that academic
year. 
There follows an analysis of this benchmark for each stage-based leaver cohort
subdivided into the three attainment groups based on complementary tariff points
awarded. 
2.7.1 Improving attainment for all – S4 Leavers Summary 
Lowest 20% 
2022-23 Average
Complementary Score Course Awards Equivalent
49
1 x SCQF Level
4 & 1 x SCQF
Level 3 
4 x SCQF Level 3 
- At 49 tariff points NAC is above the VC by 17 tariff points
- NAC has been above the VC in this measure almost every year, except for 2020
- Highest number of tariff points achieved over the last 5 years 
Middle 60% 
2022-23 Average
Complementary Score Course Awards Equivalent
175
2 x SCQF Level 5
“C”
1 x SCQF Level 4
5 x SCQF Level 4 
- At 175 tariff points NAC is below the VC by 7 tariff points
- NAC remains below the VC for the 3rd year since 2020
- Number of tariff points steadily increasing year on year with the exception of 2020. 
Highest 20% 
2022-23 Average
Complementary Score Course Awards Equivalent
331 2 x SCQF Level 5 “B”
18

Page 19

2 x SCQF Level 5 “C” 
- At 331 tariff points NAC is below the VC by 17 tariff points
- NAC remains below the VC for 3rd year since 2020
- Number of tariff points steadily increasing year on year, with tariff points back to
same number as 2020 
2.7.2 Improving attainment for all – S5 Leavers Summary 
Lowest 20%  
2022-23 Average
Complementary Score Course Awards Equivalent
103 2 x SCQF Level 4 courses
3 x SCQF Level 3 courses 
- At 103 tariff points NAC is above the VC by 23 tariff points
- NAC has been above the VC in this measure for the last 5 years
- Slightly lower number of tariff points from 2022 
Middle 60% 
2022-23 Average
Complementary Score Course Awards Equivalent
316 1 x SCQF Level 6 “C”
2 x SCQF Level 5 “C” 
- At 316 tariff points NAC is below the VC by 6 tariff points
- NAC was above the VC in this measure in 2022
- Same number of tariff points achieved in 2019 
Highest 20% 
2022-23 Average
Complementary Score Course Awards Equivalent
745 3 x SCQF Level 6
“A” 
4 x SCQF Level 6
“B” 
- At 745 tariff points NAC is above the VC by 29 tariff points
- NAC has been above the VC for the past 3 years
- Number of tariff points gained lower than 2021 and 2022 
2.7.3 Improving attainment for all – S6 Leavers Summary 
19

Page 20

Lowest 20% 
2022-23 Average
Complementary Score Course Awards Equivalent
339 1 x SCQF Level 5 “A”
3 x SCQF Level 5 “B” 
- At 339 tariff points NAC is below the VC by 15 tariff points
- NAC below VC in this measure for last two years
- Number of tariff points achieved has decreased since 2021 
Middle 60% 
2022-23 Average
Complementary Score Course Awards Equivalent
839 5 x SCQF Level 6 “C” 
- At 839 tariff points NAC is below the VC by 36 tariff points
- NAC below VC in this measure for last 5 years
- Lowest number of tariff points since 2019 
Highest 20% 
2022-23 Average
Complementary Score Course Awards Equivalent
1328 2 x SCQF Level 7 “C”
3 x SCQF Level 6 “C” 
- At 1328 tariff points NAC is below the VC by 32 tariff points
- NAC above VC in this measure in 2022
- Lowest number of tariff points since 2019 
2.8 Tackling disadvantage by improving the attainment of lower attainers relative to
higher attainers 
The Average Total Tariff Score (ATTS) for all 2023 leavers decreased slightly both
nationally and for North Ayrshire compared to previous years, returning to pre-pandemic
levels. 
While ATTS performance for pupils from SIMD deciles 1 and 2 has decreased slightly
compared to last year (as did the national performance), the overall performance of
North Ayrshire leavers from SIMD deciles 1 and 2 remains higher than the national
ATTS. (670 compared to 655).  With 43% of school leavers in North Ayrshire living in
SIMD decile 1 and 2 areas (compared to 22% nationally) – the performance of pupils
from more deprived areas has a much higher impact on the overall performance of
leavers from the entire authority. 
The absolute and the percentage gap between the performance of school leavers from
Quintile 1 (SIMD deciles 1 and 2) and the rest of the leavers from other – least deprived
– areas has decreased slightly, both in North Ayrshire and nationally, but the North
Ayrshire gap remains lower than the national gap.
20

Page 21

In relation to the virtual comparator, what is apparent is that, while school leavers from
SIMD Quintile 1 are performing in line with what is happening across similar areas in
the rest of Scotland, leavers from SIMD 3 and 4 are exceeding the performance of
school leavers from similar backgrounds and the pupils in least deprived (Quintiles 4
and 5) are underperforming according to their peers from similar backgrounds across
Scotland. 
In general, the best performing SIMD group is SIMD 4, and the weakest performance
is in SIMD 10 – where the number of pupils is particularly low. 
2.9 Increasing post-school participation 
All Leavers
In North Ayrshire Council in 2022-23, the percentage of all school leavers in a positive
destination is 96.5% which: 
- is at the highest level recorded in the last 5 years
- is above the virtual comparator, South West Educational Improvement
Collaborative and national level
- has increased for 5 consecutive years
- is above all comparators for the most deprived 20% of young people 
S4 Leavers
At 96.8%, the percentage of S4 school leavers in a positive destination: 
- is at the highest level recorded in the last 5 years
- is above the virtual comparator, South West Educational Improvement
Collaborative and national level.
- is above all comparators for the most deprived 20% of young people for the fifth
year in a row. 
S5 Leavers
At 93.8%, the percentage of S5 school leavers in a positive destination: 
- is at the highest level recorded in the last 5 years
- is above the virtual comparator and the national level 
- is above all comparators for the most deprived 20% of young people 
S6 Leavers
At 97.9%, the percentage of S6 school leavers in a positive destination: 
- is at the second highest level recorded in the last 5 years
- is above the virtual comparator and the national level 
- is at the second highest level recorded in the last 5 years for the most deprived 20%
of young people 
21

Page 22

2.10 Stretch Aims 
As part of raising attainment and closing the poverty-related attainment gap, the Scottish
Government has asked all 32 Local Authorities to set stretch aims for August 2026 (see
appendix 7). 
The core stretch aims linked to ACEL and Insight February update data are: 
- The proportion of learners in North Ayrshire who achieve the expected levels of
attainment in literacy at P1, P4 and P7 will increase.
- The proportion of learners in North Ayrshire who achieve the expected levels of
attainment in numeracy at P1, P4 and P7 will increase.
- The proportion of school leavers who achieve 1 or more awards at SCQF level 5 or
better will increase.
- The proportion of school leavers who achieve 1 or more passes at SCQF level 6
(grades A-C) or better will increase 
2.10.1 ACEL 
Literacy 
The North Ayrshire Council stretch aims and data for 2022-23 for P1/4/7 Literacy are: 
- The performance of all learners at 68.5% is an increase of 9.9 pp since 2020-21
- This is 4.3 pp below the national figure
- Q1 learners have had an increase of 13.3pp since 2020-21 to 62% 
Numeracy
The North Ayrshire Council stretch aims and data for 2022-23 for P1/4/7 Numeracy are: 
- The performance of all learners at 75.9% is an increase of 8.5pp since 2020-21
- This is 3.7pp below the national figure
- Q1 learners have had an increase of 12.9pp since 2020-21 to 71% 
2.10.2 Senior Phase 
The proportion of school leavers who achieve 1 or more awards at SCQF level 5 or
better will increase. 
Performance Measure 2023 Stretch aim (2026)
All learners 68.5% 75%
Q1 62% 72%
Q2-5 74.3% 80%
Gap 1 (Q1 vv Q2-5) -12.3pp -8pp
Performance Measure 2023 Stretch aim (2026)
All learners 75.9% 80%
Q1 71% 76%
Q2-5 80.3% 84%
Gap 1 (Q1 vv Q2-5) -9.3pp -8pp
22

Page 23

• The stretch aim for this measure is 90%
• In 2022-23, 88.5% of NAC school leavers left with a minimum of 1 qualification at
SCQF level 5
• This is above the virtual comparator 
The proportion of school leavers who achieve 1 or more passes at SCQF level 6 or
better will increase. 
• The stretch aim for this measure is 72%
• In 2022-23, 66.2% of NAC school leavers left with a minimum of 1 qualification at
SCQF level 6
• This is above the virtual comparator 
2.11 Closing the Poverty Related Attainment Gap 
Raising attainment cannot simply mean a focus on excellence but must also focus on
equity. Schools will therefore continue to be supported through our Service
Improvement Plan actions and the use of the training and professional learning by the
PLA. 
The Education Directorate and schools will be required to continue to focus on and
interrogate data to increase the pace of change in closing the poverty related attainment
gap. 
As a local authority we will be required to continue to set ambitious locally identified
stretch aims based on a three-year trajectory (2022-23, 2023-24, 2024-25) for progress
towards reaching our stretch aim target in 2025-26. These aims will be set for both
excellence and equity. Equity targets will be focused on the gap between learners in
SIMD quintile 1 (Q1) and SIMD quintiles 2-5 (Q2-5). 
2.12 Proposed Improvement Actions 
The following improvement actions are proposed in respect of the key performance
measures in learner attainment: 
Improving attainment in Literacy & Numeracy: the service improvement plan includes
specific actions to improve attainment in literacy and numeracy, including: the revision
of our existing literacy and numeracy frameworks; the design and implementation of a
3-year raising attainment strategy and a further focus on effective moderation across
and within schools. In parallel to this, schools will continue to be supported through
school improvement planning processes, quality assurance processes and the work of
the Professional Learning Academy. 
Improving Attainment for All: There will be a continuation of the focus on the middle and
highest achieving learners to ensure that our performance continues to reduce the gap
between North Ayrshire and the National performance. Part of our work will include a
further exploration of the development of learner pathways to ensure attainment and
the most appropriate initial leaver destinations for our young people.  The re-designed
senior phase curriculum structures in many schools will also enable further targeted
programmes to be developed for the lowest achieving learners, particularly in S4. 
Attainment versus Deprivation: North Ayrshire’s Attainment Challenge and Pupil Equity
Fund will continue to implement interventions for pupils living in the most deprived areas
23

Page 24

to improve their levels of attainment and achievement.     
Increasing Post-School Participation: To continue and enhance partnership  working
with Skills Development Scotland, Ayrshire College, and the Local Employability
Partnership. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Notes the content of the report, including the progress being made by learners,
specifically in literacy and numeracy;
b) Notes the achievements of school leavers in SQA examinations in 2023; and
c) Notes the measures being taken to make further improvements to attainment and
achievement levels across all schools. 
24

Page 25

4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 NAC Council Plan 2023-28: Wellbeing: To transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people: 
• Improving educational attainment and achievement and closing the attainment gap
• Developing the Young Workforce and ensuring positive destinations for school
leavers 
This work relates to the following priorities in the Education Service Plan 2023-26: 
• Improvement in attainment and achievement, particularly in literacy and numeracy
• Closing the attainment gap between the most and least disadvantaged children and
young people. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 There is a robust Quality Improvement Framework in place to support schools to
evaluate and analyse their performance and plan future improvements. This quality
improvement process features regular evaluative visits to schools by Senior Officers.
These visits feature evidence-based, challenging discussions to explore how schools
are using the analysis of their attainment as a mechanism to inform targets for
improvement. Furthermore, as part of our annual review process, we have consulted
staff across the service on the improvement priorities for the coming session, and
25

Page 26

schools have in turn engaged with their school communities on their own priorities for
improvement. 
Andrew McClelland
Head of Service (Education) 
For further information please contact Kathleen McCormick, Executive Manager, on
01294 324443. 
Background Papers
0
26

Page 27

Appendix 1
27

Page 28

28

Page 29

English Reading English Writing English Listening & Talking English Literacy Numeracy
SIMD Quintile 1 - most deprived 71% 65% 80% 62% 71%
SIMD Quintile 2 74% 72% 83% 69% 75%
SIMD Quintile 3 83% 77% 90% 76% 81%
SIMD Quintile 4 85% 82% 90% 79% 85%
SIMD Quintile 5 - least deprived 87% 85% 92% 82% 88%
%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100% P1,P4,P7 combined performance by SIMD Quintile - 2022/2023
Appendix 2a
29

Page 30

0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
English Reading English Writing English Listening & Talking English Literacy Numeracy
Attainment Gap between the 20% most SIMD Deprived and 20% least SIMD deprived 
areas in North Ayrshire compared to National (Percentage Points)
P1, P4, P7 pupils combined
2018/19 North Ayrshire 2020/21 North Ayrshire 2021/22 North Ayrshire
2022/23 North Ayrshire 2018/19 National 2020/21 National
2021/22 National 2022/23 National
Appendix 2
30

Page 31

45.00
47.00
49.00
51.00
53.00
55.00
57.00
59.00
2019 2020 2021 2022 2023
Percentage of school leavers attaining SCQF level 
6 or better in Literacy
North Ayrshire South West Collaborative
Virtual Comparator National
Appendix 3
90.00
91.00
92.00
93.00
94.00
95.00
96.00
2019 2020 2021 2022 2023
Percentage of school leavers attaining SCQF level 
4 or better in Literacy   
North Ayrshire South West Collaborative
Virtual Comparator National
78.00
79.00
80.00
81.00
82.00
83.00
84.00
85.00
2019 2020 2021 2022 2023
Percentage of school leavers attaining SCQF level 
5 or better in Literacy
North Ayrshire South West Collaborative
Virtual Comparator National
87.00
88.00
89.00
90.00
91.00
92.00
93.00
2019 2020 2021 2022 2023
Percentage of school leavers attaining SCQF level 
4 or better in Numeracy   
North Ayrshire South West Collaborative
Virtual Comparator National
63.00
64.00
65.00
66.00
67.00
68.00
69.00
70.00
71.00
72.00
73.00
2019 2020 2021 2022 2023
Percentage of school leavers attaining SCQF level 
5 or better in Numeracy
North Ayrshire South West Collaborative
Virtual Comparator National
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
2019 2020 2021 2022 2023
Percentage of school leavers attaining SCQF level 
6 or better in Numeracy
North Ayrshire South West Collaborative
Virtual Comparator National
31

Page 32

2019 2020 2021 2022 2023
North Ayrshire 1665 1797 1860 1907 1869
South West Collaborative 1770 1858 1920 1916 1895
Virtual Comparator 1749 1865 1910 1876 1866
National 1830 1921 1982 1950 1931
1600
1700
1800
1900
2000
Attainment for All ‐ Average total tariff score of the highest attaining 
20%
2019 2020 2021 2022 2023
North Ayrshire 697 780 840 812 744
South West Collaborative 769 821 875 827 780
Virtual Comparator 733 821 873 804 766
National 821 880 939 871 832
650
700
750
800
850
900
950
1000
Attainment for All ‐ Average total tariff score of the middle attaining 
60% 
2019 2020 2021 2022 2023
North Ayrshire 145 139 160 155 133
South West Collaborative 151 144 163 154 144
Virtual Comparator 120 126 157 140 127
National 151 151 164 154 141
110
120
130
140
150
160
170
Attainment for All ‐ Average total tariff score of the lowest attaining 
20%
Appendix 4 
32

Page 33

0
50
100
150
200
250
300
350
400
450
500
2019 2020 2021 2022 2023
S4 Leavers ‐ Average total tariff score 
of the highest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
0
50
100
150
200
250
2019 2020 2021 2022 2023
S4 Leavers ‐ Average total tariff score of the 
middle attaining 60% 
North Ayrshire South West Collaborative
0
10
20
30
40
50
60
2019 2020 2021 2022 2023
S4 Leavers ‐ Average total tariff score of the 
lowest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
0
200
400
600
800
1000
1200
2019 2020 2021 2022 2023
S5 Leavers ‐ Average total tariff score of the 
highest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
0
50
100
150
200
250
300
350
400
450
500
2019 2020 2021 2022 2023
S5 Leavers ‐ Average total tariff score of the 
middle attaining 60%
North Ayrshire South West Collaborative Virtual Comparator National
0
20
40
60
80
100
120
140
2019 2020 2021 2022 2023
S5 Leavers ‐ Average total tariff score of the 
lowest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
1650
1700
1750
1800
1850
1900
1950
2000
2050
2100
2150
2019 2020 2021 2022 2023
S6 Leavers ‐ Average total tariff score of the 
highest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
0
200
400
600
800
1000
1200
1400
1600
2019 2020 2021 2022 2023
S6 Leavers ‐ Average total tariff score of the 
middle attaining 60%
North Ayrshire South West Collaborative Virtual Comparator National
0
100
200
300
400
500
600
2019 2020 2021 2022 2023
S6 Leavers ‐ Average total tariff score of the 
lowest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
Appendix 4a Appendix 4b Appendix 4c
33

Page 34

280
290
300
310
320
330
340
350
360
370
2019 2020 2021 2022 2023
S4 Leavers ‐ Average complementary tariff score of the 
highest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
0
50
100
150
200
250
2019 2020 2021 2022 2023
S4 Leavers ‐ Average complementary tariff score of the middle 
attaining 60% 
North Ayrshire South West Collaborative Virtual Comparator National
0
10
20
30
40
50
60
2019 2020 2021 2022 2023
S4 Leavers ‐ Average complementary tariff score of the lowest 
attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
600
650
700
750
800
850
2019 2020 2021 2022 2023
S5 Leavers ‐ Average complementary tariff score of the 
highest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
0
50
100
150
200
250
300
350
400
2019 2020 2021 2022 2023
S5 Leavers ‐ Average complementary tariff score of the 
middle attaining 60%
North Ayrshire South West Collaborative Virtual Comparator National
0
20
40
60
80
100
120
2019 2020 2021 2022 2023
S5 Leavers ‐ Average complementary tariff score of the 
lowest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
1200
1250
1300
1350
1400
1450
2019 2020 2021 2022 2023
S6 Leavers ‐ Average complementary tariff score of the 
highest attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
700
750
800
850
900
950
1000
2019 2020 2021 2022 2023
S6 Leavers ‐ Average complementary tariff score of the middle 
attaining 60%
North Ayrshire South West Collaborative Virtual Comparator National
310
320
330
340
350
360
370
380
390
400
410
2019 2020 2021 2022 2023
S6 Leavers ‐ Average complementary tariff score of the lowest 
attaining 20%
North Ayrshire South West Collaborative Virtual Comparator National
Appendix 4a Appendix 4b Appendix 4c
34

Page 35

628
691 763
937 901
1022
1073
1115
1173
1150
634
676
736
793
873
922
998
1078
1168
1350
350
550
750
950
1150
1350
1550
0 1 2 3 4 5 6 7 8 9 10 11SIMD Decile
Average Total Tariff Score by SIMD decile ‐ All School leavers 2023
North Ayrshire National Trend line ‐ North Ayrshire Trend line ‐ National
Appendix 5
35

Page 36

94.0
92.5
95.2
96.0
96.5
94.4 94.3
95.8
96.7
96.4
94.0
92.3
95.1 94.9
95.31
95.1
93.4
95.5
95.7 95.9
90.0
91.0
92.0
93.0
94.0
95.0
96.0
97.0
98.0
2018/19 2019/20 2020/21 2021/22 2022/23
Comparative Performance on % of School Leavers  Moving into Positive
Destinations
North Ayrshire South West Collaborative Virtual Comparator National
Appendix 6
36

Page 37

Stretch Aims Summary:
The stretch aims are listed in summary format here. 
CORE OUTCOMES
FOR
IMPROVEMENT 
Performance up to 2023 Stretch Aim 
(by August 2026)
Actual Progress Summary 
(updated annually)
Description of
improvement
Performance
Measure 2019 2020 2021 2022 2023  2024 2025 2026
Core Stretch Aim 1
The proportion of learners in
North Ayrshire who achieve
the expected levels of
attainment in literacy at P1,
P4 and P7 will increase.
All learners 74% n/a 59% 67% 68% 75%   
Q1 67% n/a 49% 60% 63% 72%   
Q2-5 79% n/a 67% 74% 74% 80%   
Q5 89% n/a 70% 83% 82% 88%   
Gap 1 (Q1 vv Q2-
5) -12pp n/a -18pp -14pp -11pp -8pp   
Gap 2 (Q1 vv Q5) -22pp n/a -21pp -23pp -19pp -16pp   
Core Stretch Aim 2
The proportion of learners in
North Ayrshire who achieve
the expected levels of
attainment in numeracy at
P1, P4 and P7 will increase.
All learners 79% n/a 67% 75% 76% 81%   
Q1 74% n/a 58% 69% 71% 78%   
Q2-5 84% n/a 75% 81% 80% 86%   
Q5 91% n/a 82% 87% 87% 91%   
Gap 1 (Q1 vv Q2-
5) -10pp n/a -17pp -12pp -9pp -8pp   
Gap 2 (Q1 vv Q5) -17pp n/a -24pp -18pp -16pp -13pp   
Core Stretch Aim 3
The proportion of school
leavers who achieve 1 or
more awards at SCQF level 5
or better will increase.
All learners 87% 86% 90% 89% n/a 92%   
Q1 80% 79% 83% 82% n/a 89%   
Q2-5 93% 92% 95% 93% n/a 95%   
Q5 98% 97% 99% 96% n/a 98%   
Gap 1 (Q1 vv Q2-
5) -13pp -13pp -12pp -11pp n/a -6pp   
Gap 2 (Q1 vv Q5) -18pp -18pp -16pp -14pp n/a -9pp   
Core Stretch Aim 4 All learners 65% 67% 71% 68% n/a 74%   
37

Page 38

CORE OUTCOMES
FOR
IMPROVEMENT 
Performance up to 2023 Stretch Aim 
(by August 2026)
Actual Progress Summary 
(updated annually)
The proportion of school
leavers who achieve 1 or
more passes at SCQF level 6
(grades A-C) or better will
increase. 
Q1 52% 55% 61% 56% n/a 62%   
Q2-5 75% 76% 78% 77% n/a 80%   
Q5 89% 87% 87% 86% n/a 90%   
Gap 1 (Q1 vv Q2-
5) -23pp -21pp -17pp -21pp n/a -18pp   
Gap 2 (Q1 vv Q5) -37pp -32pp -26pp -30pp n/a -28pp   
CORE OUTCOMES
FOR
IMPROVEMENT 
Performance up to 2023 Stretch Aim 
(by August 2026)
Actual Progress Summary 
(updated annually)
Description of
improvement
Performance
Measure 2019 2020 2021 2022 2023  2024 2025 2026
Core Stretch Aim 5
The proportion of 16-19 year-
olds who are participating in
education, employment or
training will increase.
All learners 90.5% 90.6% 90.1% 90.8% 93.9% 95%   
Q1 87.8% 86.9% 85.3% 88.0% 90.6% 92.5%   
Q2-5 92.4% 93.5% 93.9% 93.0% 96.2% 97.5%   
Q5 94.7% 96.7% 96.1% 96.4% 98.1% 99%   
Gap 1 (Q1 vv Q2-
5) -4.6pp -6.6pp -8.6pp -5pp -5.6pp -5pp   
Gap 2 (Q1 vv Q5) -6.9pp -9.8pp -10.8pp -8.4pp -7.5pp -6.5pp   
Core Stretch Aim 6
School attendance levels will
increase. 
All learners 92.1% 91.6% 91.4% 89.4% 88.8% 93%   
Q1 90.7% 90.1% 89.9% 87.7% 86.7% 92%   
Q2-5 93.2% 92.8% 92.8% 90.8% 90.5% 94%   
Q5 94.6% 94.1% 94.0% 91.7% 91.6% 95.5%   
Gap 1 (Q1 vv Q2-
5) -2.5pp -2.7pp -2.9pp -3.1pp -3.8pp -2pp   
38

Page 39

CORE OUTCOMES
FOR
IMPROVEMENT 
Performance up to 2023 Stretch Aim 
(by August 2026)
Actual Progress Summary 
(updated annually)
Gap 2 (Q1 vv Q5) -3.9pp -4pp -4.1pp -4pp -4.9pp -3.5pp   
39

Page 40

40

Page 41

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet (Education) 
Title:    Educational Achievement of Care Experienced Learners in
North Ayrshire in 2023 
Purpose:  To update Cabinet on: (i) Curriculum for Excellence Broad
General Education (BGE) attainment levels of care experienced
learners in 2022; (ii) Senior Phase attainment of care
experienced school leavers in 2023; (iii) post-school participation
of care experienced learners 
Recommendation:  That Cabinet:
a) Notes the content of the report, including the progress being
made by care experienced learners, specifically in literacy and
numeracy.
b) Notes the achievements of care experienced school leavers in
SQA examinations in 2023.
c) Notes the progress in closing the attainment gap between all
learners and care experienced learners.
d) Notes the positive progress in post-school participation of care
experienced school leavers 
1. Executive Summary 
1.1 North Ayrshire Council has high expectations for all learners and is committed to
improving educational outcomes for all children and young people.  Two of the current
five strategic priorities for the Education Directorate are directly linked to raising
attainment: 
• Improvement in attainment, particularly in literacy and numeracy
• Closing the attainment gap between the most and least disadvantaged children and
young people 
1.2 The Scottish Government has released new leavers’ data for session 2022/23 through
the benchmarking tool for the senior phase: ‘Insight’. Insight provides schools with a
school level statistical summary of attainment. It anonymises data for individual learners
or groups of learners which prevents them from being identified. 
There is a sustained improvement in attainment, particularly in literacy and numeracy,
with North-Ayrshire’s Care Experienced learners performing better than both national
and South West collaborative care experienced learners (Appendix 3).
Agenda Item 5
41

Page 42

Our Care Experienced learners are among our most disadvantaged learners, whilst
there remains a gap between them and our non-care experienced learners, we can see
a narrowing of the gap in Primary school. (Appendix 2). 
1.3 There continues to be a positive trend in average total tariff score over the last 6 years.
The proportion of care experienced learners entering a positive destination has been
above the national figure for the last 6 years. 
2. Background 
2.1 Care experienced young people are categorised for the purposes of our management
information system SEEMIS as: Looked After at Home, Looked After Away from Home
and Previously Looked After. The total number of Care experienced young people in
North Ayrshire at the annual census date in September each year is shown in the charts
in Appendix 1. In 2023 there were 814 care experienced young people enrolled in North
Ayrshire schools, with 57 leavers in 2023. 
2.2 National Benchmarking Measures 
One of the functions of Insight is to provide an analysis of four national benchmarking
measures showing the performance of pupils at the point of exit from school. This
provides a consistent benchmark and emphasises that attainment and achievement in
S4 to S6 are cumulative. These measures are connected and should be looked at
together when considering the performance of a school or local authority and the next
steps to be taken in seeking further improvements. 
2.3 The four National Benchmarking Measures are: 
-  Improving attainment in literacy and numeracy 
Our aim is for all our school leavers to be highly literate and numerate, increasing their
life chances greatly. 
Curriculum for Excellence stresses the responsibility of all teachers for developing
literacy and numeracy skills. This reflects the importance placed on these crucial skills
which unlock learning in all other areas of the curriculum and are vital for success in
learning, life and work in the modern world and workplace.
- Improving attainment for all
The overall aim for this measure, along with tackling disadvantage, is to have our pupils
attain as highly as possible 'across the board'. 
Attainment is an individual’s passport to personal, social, cultural and economic
opportunities. Raising attainment means improving life chances. This does not mean
just focusing on exam results, but instead looking at attainment in its widest sense. It is
this rich attainment which enables all of our children and young people to make good
progress and develop the skills, ambition, and know-how they need to improve life
chances. 
42

Page 43

- Tackling disadvantage by improving the attainment of lower attainers relative
to higher attainers 
The overall aim for this measure, together with improving attainment for all, is to have
our pupils attain as highly as possible 'across the board'. 
This measure is aimed at reducing the gap in attainment associated with the
incidence of higher and lower deprivation and has the same aspirations for our
learners as improving attainment for all. 
- Increasing post-school participation 
Considering the destinations of our leavers is a vital part of ensuring that Curriculum
for Excellence is a success in our schools. The measure focuses on initial
destinations and is linked with Skills Development Scotland's information. 
2.4 This report focuses on the following key measures: 
1. Attainment in Literacy and Numeracy across the Broad General Education for care
experienced learners for 2023. 
2. Attainment in Literacy and Numeracy and overall attainment in all qualifications at
Senior Phase level for care experienced school leavers in 2023. 
3. Average Total Tariff Score of school leavers. 
4. Post-school participation of care experienced school leavers for 2022. 
2.5 Attainment in Literacy and Numeracy in Broad General Education for care
experienced learners (These highlights are supported by charts in Appendix 2) 
The charts at Appendix 2 indicate that the attainment of care experienced learners at
BGE stages P1, P4 and P7. At all stages, achievement of Literacy and Numeracy levels
have increased for care experienced learners from 2021 figures. The gap between the
attainment of all learners and care experienced learners remains, however it is closing,
most significantly in levels of literacy. 
2.6 Attainment in Literacy and Numeracy and overall attainment in all qualifications
at Senior Phase level for care experienced school leavers (These highlights are
supported by charts in Appendices 3-5) 
2.6.1 It should be noted that the cohort size for care experienced school leavers varies from
year to year and is generally around 50 young people. Therefore, care must be taken
when analysing variations in performance for this group. For example, one care
experienced learner attaining/not attaining a specific qualification may account for more
than 2 percentage points of a difference in the overall attainment measures for care
experienced learners (whereas in the general population, one pupil would make less
than 0.07 percentage points of a difference in the same attainment measure). 
2.6.2 Performance in Literacy and Numeracy at SCQF levels 4 and 5 is consistently lower for
care experienced leavers than for the overall school leaver cohort in North Ayrshire.
However, North Ayrshire care experienced school leavers consistently perform better
than their counterparts nationally and in the SWEIC authorities (see Appendix 3). 
43

Page 44

2.6.3 For Level 4 Literacy (79%) and Numeracy (82.5%) in 2023, care experienced leavers
in North Ayrshire are above both the regional and the national performance. Attainment
in Level 4 numeracy is at its highest level since 2014. For Level 5 Literacy (50.9%) and
Numeracy (36.8%) in 2023, again North Ayrshire care experienced leavers are above
both the regional and national performance. 
2.6.4 In 2023, 87% of North Ayrshire’s care experienced leavers attained at least 1
qualification at SCQF Level 4 or better, this is slightly lower than 2022. For Level 5,
61% of care experienced leavers achieved at least 1 qualification again slightly lower
than the previous year. The proportion of care experienced school leavers achieving at
least 1 Level 6 award was 32%. Whilst some of these results seem disappointing it may
be explained by the small cohort, and leavers attainment still remains well above the
national measure. 
2.6.5 The average total tariff score achieved continues to be above the National performance.
At 411, the average total tariff score for North Ayrshire’s care experienced school
leavers is the third best performance to date (excluding the two previous alternative
certification model years). Both locally and nationally there remains a gap between the
attainment of care experienced learners and those who are not care-experienced. In
North Ayrshire, the gap continues to close, with this year being the smallest gap in the
last 8 years. This is encouraging news but there remains significant work to be done to
raise attainment for all and to continue to close the gap. 
2.7 Post-school participation of care experienced school leavers (These highlights are
supported by charts in Appendix 6) 
The overall percentage of North Ayrshire care experienced school leavers entering a
positive destination continues to be above the national performance. In 2023, the
number of care experienced school leavers in a positive destination is 94%, with the
gap between care experienced leavers and all leavers being at 2.6%. The percentage
of leavers in positive destinations continues in an upward trend since 2015. 
2.8 Proposed Improvement Actions
The Education service continues to prioritise on improving outcomes for all learners
including our most disadvantaged. Attainment of Care Experienced learners is
specifically referenced within the education service plan. Quality Improvement visits will
include a focus on the attainment and achievement of this group of learners to ensure
consistency of delivery of interventions with a positive impact. During this coming
session all staff will be provided with the opportunity to improve their knowledge of the
role of education in keeping The Promise. Mindful that education alone cannot improve
outcomes for care experienced children and young people, we will continue to
collaborate with both local and external partners to provide care experienced children
and young people with positive learning experiences. 
44

Page 45

3. Proposals 
3.1 It is proposed that Cabinet: 
a) Notes the content of the report, including the progress being made by learners,
specifically in literacy and numeracy; and
b) Notes the achievements of school leavers in SQA examinations in 2023.
c) Notes the progress in closing the attainment gap between all learners and care
experienced learners.
d) Notes the positive progress in post-school participation of care experienced school
leavers. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Tackling inequality is a key aspect of this report. The Council is committed to a
continued focussed approach to improve outcomes for care experienced leavers. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 NAC Council Plan 2023-28: Wellbeing: To transition to a wellbeing economy,
delivering prosperity, wellbeing and resilience for local people: 
• Improving educational attainment and achievement and closing the attainment gap
• Developing the Young Workforce and ensuring positive destinations for school
leavers 
This work relates to the following priorities in the Education Service Plan 2023-26: 
• Improvement in attainment and achievement, particularly in literacy and numeracy
• Closing the attainment gap between the most and least disadvantaged children and
young people. 
45

Page 46

Community Wealth Building 
4.7 The Council will continue to consider the pillars of community wealth building in any
future developments in this area. 
5. Consultation 
5.1 None specifically related to this report. 
Andrew McClelland
Head of Service (Education) 
For further information please contact Eilidh James, Quality Improvement Officer, on
01294 324443. 
Background Papers
None.
46

Page 47

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet (Education) 
Title:    Play Pedagogy in the early stages of primary 
Purpose:  To provide Cabinet with information on the current and proposed
approach to play pedagogy in primary school establishments. 
Recommendation:  That Cabinet:
a) Notes our current and proposed approach to play pedagogy
in our primary schools.
b) Agrees to receive further updates through the annual
Education Service Standards and Quality Report. 
1. Executive Summary 
1.1  North Ayrshire is committed to developing play within our schools. We understand that
effective play pedagogy can support the development of creativity and curiosity in our
children. It will also engage our children in meaningful learning, encouraging autonomy
and motivation and developing confident individuals. Our Professional Learning
Academy has provided training and support to schools to support the knowledge and
skills development across our workforce. 
1.2 A suite of documents was created to support staff in evaluating their provision and
identifying their next steps in the approach to play including a self-evaluation document,
an environment and observation tools. 
1.3 All primary schools will have received training and support by June 2024. 
1.4 The key strengths of approaches to play pedagogy the early stages of primary in North
Ayrshire are: 
• A strong commitment to the development of play pedagogy
• The positive role of the professional learning academy in delivering training in play
and creating a network for sharing practice and collaborating on implementation
• Some good examples of early adopters of play in primary which will support further
development and expansion of the model
• Strong support to establishments provided through clear documentation
• The positive impact of play on children in primary settings 
1.5 Play will remain on our Service Improvement Plan for session 24-25 ensuring all staff
are delivering high quality learning experiences through play for our young people. 
Agenda Item 6
47

Page 48

2. Background 
2.1 The United Nations Convention on the rights of the child states that “that every child
has the right to rest and leisure to engage in play and recreational activities, appropriate
to the age of the child, and to participate freely in cultural life and the arts. In recognition
of this right and in acknowledgement that the brain development of young people
is directly shaped by their experiences and the environment in which these experiences
occur, (Harvard University, 2007) the Scottish Government implemented a national play
strategy to recognise the crucial role of play when educating Scotland’s learners and
preparing them for the future. 
North Ayrshire Council is one of this country’s most deprived local authorities with levels
of deprivation significantly higher than in other areas; 45.9% of our children and young
people live in the postcodes that have the highest levels of deprivation in Scotland, and,
according to UK government statistics, 29% live in relative poverty. Six thousand of our
children and young people are registered for footwear and clothing grants. Such levels
of deprivation have a significant impact upon our children’s ability to meet their early
milestones and on their ability to access the curriculum. 
2.2 Play pedagogy ensures play is central to learning, giving pupils the flexibility to be
creative, curious learners. It engages children in meaningful learning, encouraging
autonomy and motivation and developing confident individuals. 
2.3 The timeline below provides an illustration of the implementation of the play pedagogy
within North Ayrshire. 
2.3.1 2020 - 2021
Our Professional Learning Academy staff worked collaboratively with colleagues from
Education Scotland and SWEIC (South West Educational Improvement Collaborative)
to develop their knowledge and understanding of play pedagogy in the early stages of
primary school. 
They attended training, workshops and engaged with establishments within North
Ayrshire and across other authorities who were already engaged in play pedagogy in
Primary 1. 
The Professional Learning Academy, alongside our central Early Years team, Head
Teachers and Senior Managers developed North Ayrshire’s rationale for Play
Pedagogy. 
2.3.2 2021 - 2022
The Professional Learning academy employed a class teacher to deliver training for our
schools with a specific focus on play. 
We engaged with 16 schools over the session. 8 schools with the highest levels of
socio-economic disadvantage were provided with an Early Years Practitioner. 
48

Page 49

The Professional Learning Academy staff, alongside members of our Early Years
central team delivered 7 training sessions as well as providing bespoke in school
support. This helped our practitioners to bridge the gap between theory and practice as
well as improving the environments within our classrooms and playrooms to support
our play approach. 
A suite of documents was created to support staff in evaluating their provision and
identifying their next steps in the approach to play. These include:
• How Good Is Our Play Pedagogy?: this is a self-evaluation document which
explores how our schools are encouraging learners to collaborate, lead and follow
their interests, take risks and solve problems.
• An Environment audit tool to explore how settings use their indoor and outdoor
environments providing challenge and opportunities to develop the skills of the
young people engaging in a range of play activities and investigation.
• An Observation audit tool to support practitioners to understand the power of
observation and interactions to extend children’s learning. The tool supports the use
of effective questioning, formative assessment strategies and data to inform
interactions, providing challenge and support through play contexts. Learner
participation is valued, learning is made visible, and learners are encouraged to lead
interactions becoming effective contributors. 
The success of this year culminated in a showcase event to promote play pedagogy
across all North Ayrshire primary schools and case studies were written to provide
evidence of the positive impact of this initiative. 
2.3.3 2023 – 2024
Our Early Year Practitioners were redeployed and follow the revised structure for our
Professional Learning Academy. By the end of the session almost all of our primary
schools will have had an input from these practitioners to support play pedagogy in
North Ayrshire. 
The documentation developed last session has been shared with all of our primary
schools. Staff are encouraged to use our Play Environment and Observation Audit tools
and How Good Is Our Play Pedagogy toolkit to support self-evaluation of their own
understanding and delivery of play pedagogy. 
2.4 In our evaluation of play pedagogy we can confidently say our schools are engaging
with national guidance and priorities around Play Pedagogy. Guidance and Professional
learning has been provided by our authority to enable our Class Teachers and Early
Years Practitioners to provide high quality learning experiences for our young people. 
2.5 However, in light of decreasing budgets from the Scottish Attainment Challenge /
Strategic Equity Fund which has funded Play Pedagogy, a re-evaluation of delivery
models, training and support was required. As part of this members of education staff
recently participated in a national Collaborative Improvement programme. This involved
staff from our local authority, Education Scotland, and representatives of the Association
of Directors of Education Scotland (ADES) from other local authorities. 
49

Page 50

2.6 This approach to collaborative improvement was initially outlined in the “Education
Reform - Joint Agreement” between the Scottish Government and Local Government,
published in June 2018, and was based on the recommendation for a “strengthened
middle” in the 2015 OECD Report on Scottish Education, “Improving Schools in
Scotland: An OECD Perspective.” The approach is also intended to address the
recommendation in Audit Scotland’s 2021 Report, “Improving outcomes for young
people through school education” that Councils should work with schools, Regional
Improvement Collaboratives, other policy teams and partners to promote partnership
working to ensure sustainable improvements for all children and young people. 
2.7 The collaborative improvement visit took place over three days in December 2023 and
was supported by an extensive team including: 
• ADES General Secretary
• Representatives from Education Scotland including inspectors, Attainment Advisors
and Education Officers
• Representatives from other local authorities including Quality Improvement Officers
• North Ayrshire representatives including Head of Service, Senior Manager, Early
Years Co-ordinator and colleagues from North Ayrshire’s Professional Learning
Academy 
2.8 The focus for North Ayrshire’s collaborative improvement was play pedagogy in Primary
1. The overarching question: 
‘To what extent is North Ayrshire’s approach to play pedagogy improving outcomes for
our learners in the early stages of primary?’ 
2.9 A programme was developed to enable members of the collaborative improvement
team to explore four themes and focussed questions pertaining to the overarching
question. 
The four themes and questions were:
Theme 1: Leadership of Play
• What are the strengths and challenges
to leading and delivering play
pedagogy?
• What should be the leadership priorities
and/or actions to continue to develop
play in our primaries? 
Theme 2: Professional Learning to
Support the Development of Play
• To what extent does North Ayrshire’s
play professional learning equip
practitioners with the skills, knowledge,
and confidence to deliver play?
• What professional learning is required to
continue to grow and embed this
model?
Theme 3: Play Pedagogy in
Practice
• How can we ensure consistent quality of
delivery of play across all schools?
• How can we ensure that play pedagogy
delivers on national policy & priorities?
• To what extent does play pedagogy
facilitate early level outcomes
(benchmarks, Es & Os) for learners? 
50

Page 51

Team members engaged in a series of focus groups designed to explore each of the
themes, visited school settings to observe play pedagogy in context, attended a series
of scheduled meetings with school staff and leaders, and took the opportunity to explore
documentation and resources. 
2.10 At the end of the collaborative improvement process, a report was written, outlining the
key strengths and potential next steps. The full report is available at Appendix 1 and
has been published on the ADES website. 
2.11 In summary, the key strengths of approaches to play pedagogy the early stages of
primary in North Ayrshire are: 
• A strong commitment to the development of play pedagogy
• The positive role of the professional learning academy in delivering training in play
and creating a network for sharing practice an collaborating on implementation
• Some good examples of early adopters of play in primary which will support further
development and expansion of the model
• Strong support to establishments provided through clear documentation
• The positive impact of play on children in primary settings 
2.12 In terms of potential next steps, the report proposed the following areas for
consideration: 
• The development of a 3-year strategic plan for extending play pedagogy across all
primary schools
• Consideration of further enhancements to links across stages in the early level to
capitalise on staff expertise
• The strengthening of shared rationale and a shared language for play
• The further development of professional learning programmes to maximise the
impact of play across the Service
• The strengthening of data and evidence of impact across all establishments 
2.13 The collaborative improvement process has been exceptionally beneficial to the
Education Service. In general terms the team has validated our own self-evaluation and
endorsed our long-term vision, at the same time as supporting us to create practical
next steps. The visiting team shared national best practice that can now be used to
enhance our approaches and these areas will be taken forward with support from the
visiting team where beneficial. 
2.14 The findings of the Collaborative Improvement will be shared with the sector, at a Head
Teacher meeting, with the central team and with the Children’s Services Strategic
Partnership. 
Theme 4: Quality Assurance and
North Ayrshire’s Data Narrative
• Are we gathering the right data to inform
the next steps?
• To what extent is our quality assurance
process for play tailored and robust?
• How can we develop play pedagogy to
be sustainable, measurable, and
deliverable? 
51

Page 52

2.15 A Service Improvement Group will be established to plan and oversee the work moving
on from this collaborative. 
2.16 Actions that can be taken forward with relative ease will be prioritised for completion by
June 2024, other areas will be used to inform Service Plan and School Improvements
Plans for 2024/25. 
2.17 The Education Service will engage with the ADES Officer and Education Scotland to
secure on-going support in areas agreed with them. 
3. Proposals 
3.1 It is proposed that Cabinet:  
a) Notes our current and proposed approach to play pedagogy in our primary schools
b) Agrees to receive further updates through the annual Education Service Standards
and Quality Report. 
4. Implications/Socio-economic Duty 
Financial 
4.1 North Ayrshire Council (NAC) has received Scottish Government Attainment Scotland
Funding since the Scottish Attainment Challenge (SAC) was announced in February
2015. NAC was identified as one of nine ‘challenge authorities’ that were selected due
to having the highest highest concentrations of primary aged children living in deprived
areas and will focus on targeting improvements in literacy, numeracy, and health and
wellbeing. In 2021, Scottish Government announced funding previously allocated to
challenge authorities would be redistributed to all local authorities as a Strategic Equity
Fund (SEF). Consequently, North Ayrshire’s local authority funding will reduced from
£5.8m in 2020/21 to £1.4m in 2025/26 with annual reduction of £1.1m per annum. 
4.2 The Professional Learning Academy continues to be funded from the Strategic Equity
Fund and they will continue to support North Ayrshire’s vision to be one of the best
places to grow up in Scotland. The aim of the Strategic Equity Fund is to deliver equity
through improving outcomes for learners impacted by poverty and we believe that
access to play and play pedagogy will support us to achieve this. 
Human Resources 
4.3 The decreasing funding from the Strategic Equity Fund has impacted on the staff
employed by the Professional Learning Academy to deliver play pedagogy. We will no
longer have Early Years Practitioners supporting our establishments from August 2024
however play pedagogy will remain a focus for North Ayrshire’s Education Service. The
Professional Learning Academy Head Teacher will continue to prioritise training and
support for leaders and our staff in establishments. 
Legal 
4.4 None.
52

Page 53

Equality/Socio-economic 
4.5 Local authorities are tasked with strategically developing approached to improving the
educational attainment and achievement of young people impacted by poverty. North
Ayrshire is ensuring Strategic Equity Funding is focused on resources, activities and
approaches to support learners impacted by poverty, which will ultimately lead to
improvements in literacy, numeracy and health and wellbeing. 
Climate Change and Carbon 
4.6 None. 
Key Priorities 
4.7 The development of play pedagogy aligns to North Ayrshire’s Education service Plan
Priorities: 
• Improvement in attainment, particularly in literacy and numeracy.
• Closing the attainment gap between the most and least disadvantaged children and
young people.
• Improvement in skills and sustained, positive school leaver destinations for all young
people.
• Improvement in children and young people’s health and wellbeing.
• Placing human rights and needs of every child and young person at the centre
of education. 
Community Wealth Building 
4.8 None. 
5. Consultation 
5.1 Consultation with Heads of Establishments, Senior Leaders in our schools, Class
Teachers, Early Years Practitioners, support staff and young people will continue to
ensure our key areas of focus remain key to high level quality learning and teaching and
ultimately improving the outcomes for our young people. 
Andrew McClelland
Head of Service (Education) 
For further information please contact Sharon McDowell, Senior Manager, on 01294
324443. 
Background Papers
1
53

Page 54

COLLABORATIVE
IMPROVEMENT SUMMARY
OF FINDINGS
North Ayrshire Council, ADES & Education Scotland
December 2023 
54

Page 55

1 of 10 
Aim of Collaborative Improvement 
The aim of Collaborative Improvement is to bring about improvement through shared
work involving staff from the local authority, Education Scotland, and Association of
Directors of Education Scotland (ADES). Together the group establish the focus for
the collaborative improvement visit and then undertake activities in the local authority
that will result in an evaluative summary of where there are strengths and where
there are areas that may require further focus. 
This approach to collaborative improvement was initially outlined in the “Education
Reform - Joint Agreement” between the Scottish Government and Local
Government, published in June 2018, and was based on the recommendation for a
“strengthened middle” in the 2015 OECD Report on Scottish Education, “Improving
Schools in Scotland: An OECD Perspective.” The approach is also intended to
address the recommendation in Audit Scotland’s 2021 Report, “Improving outcomes
for young people through school education” that Councils should work with schools,
Regional Improvement Collaboratives, other policy teams and partners to promote
partnership working to ensure sustainable improvements for all children and young
people. 
The model is resourced by an ADES Officer acting as coordinator. The coordinator
secures the release of senior colleagues from some of Scotland’s 32 Local Authorities
whilst Education Scotland identify a team of Inspectors and Officers to join the peer
review team. Over the collaborative improvement visit the teamwork with the host
Local Authority to explore overarching question of the host Local Authority’s choosing.
In real terms, collaborative improvement enables an individual Local Authority to
identify an area for further exploration based on their own self-evaluation and then
benefit from an objective 3-day peer assessment of what is working well and what may
require further focus. 
North Ayrshire’s Context 
North Ayrshire Council is one of this country’s most deprived local authorities with
levels of deprivation significantly higher than in other areas; 45% of our children and
young people live in the postcodes that have the highest levels of deprivation in
Scotland, and, according to UK government statistics, 24% live in relative poverty. Six
thousand of our children and young people are registered for footwear and clothing
grants. Such levels of deprivation have a significant impact upon our children’s ability
to meet their early milestones and on their ability to access the curriculum. As such,
North Ayrshire has been a challenge authority since 2015 working hard to close the
attainment gap. 
55

Page 56

2 of 10 
Focus of North Ayrshire Council’s Collaborative Improvement visit 
The focus for North Ayrshire’s collaborative improvement was play pedagogy in
Primary 1. North Ayrshire strives to be one of the best places to grow up in Scotland
and we believe that access to play and play pedagogy will support us to achieve this.
We understand that effective play pedagogy can support the development of
creativity and curiosity in our children. It will also engage our children in meaningful
learning, encouraging autonomy and motivation and developing confident
individuals. 
The overarching question: 
‘To what extent is North Ayrshire’s approach to play pedagogy improving outcomes
for our learners in the early stages of primary?’ 
A programme was developed to enable members of the collaborative improvement
team to explore four themes and focussed questions pertaining to the overarching
question. 
The four themes and questions were: 
Theme 1: Leadership of Play
• What are the strengths and challenges to
leading and delivering play pedagogy?
• What should be the leadership priorities and/or
actions to continue to develop play in our
primaries? 
Theme 2: Professional Learning to
Support the Development of Play
• To what extent does North Ayrshire’s play
professional learning equip practitioners with
the skills, knowledge, and confidence to deliver
play?
• What professional learning is required to
continue to grow and embed this model?
Theme 3: Play Pedagogy in Practice
• How can we ensure consistent quality of
delivery of play across all schools?
• How can we ensure that play pedagogy
delivers on national policy & priorities?
• To what extent does play pedagogy facilitate
early level outcomes (benchmarks, Es & Os)
for learners? 
Theme 4: Quality Assurance and North
Ayrshire’s Data Narrative
• Are we gathering the right data to inform the
next steps?
• To what extent is our quality assurance process
for play tailored and robust?
• How can we develop play pedagogy to be
sustainable, measurable, and deliverable? 
The collaborative improvement visit took place over three days in December 2023
and was supported by an extensive team including: 
• Michael Woods, ADES General Secretary
• Carol Copstick, Education Scotland
• Jacqueline Nimmo, Education Scotland
56

Page 57

3 of 10 
• Bernadette Martin-Smith, Quality Improvement Officer, Perth and Kinross
Council
• Nicola Henry, Attainment Advisor, Education Scotland, Southwest
• Barbara Daly, HM Inspector from Education Scotland 
• Catriona Gill, Education Officer Early Years, Education Scotland
• Denise Lorimer, Quality Improvement Officer (Early Years, Aberdeen City
Council
• Heather Douglas, Head of Early Learning & Childcare, Glasgow City Council
• Sharon McDowell, Senior Manager, North Ayrshire Council
• Christine Grace, Head Teacher Professional Learning, North Ayrshire Council
• Joanne MacLean, DHT Professional Learning, North Ayrshire Council
• Lynsey Clark, Early Years Co-ordinator, Community & Education Services 
Team members engaged in a series of focus groups designed to explore each of the
themes, visited school settings to observe play pedagogy in context, attended a series
of scheduled meetings with school staff and leaders, and took the opportunity to
explore documentation and resources. This evidence was used to inform the findings
of the team. 
The analysis and challenge provided by the collaborative improvement team has
contributed to reflecting upon our progress so far and in exploring the next steps in
our improvement journey. We will now refocus the key aspects of our action plan to
be undertaken by the service. The findings of the visit are outlined below. 
What is working well? 
Leadership of Play 
We have a strong commitment to the development of play pedagogy within our
authority. Play pedagogy is a focus on our Service Improvement Plan, and we have
central officers with key responsibility for Learning, Teaching and Assessment who
are committed to the development of play pedagogy within the early stages of
primary. 
Our Professional Learning Academy has played a key role in delivering North
Ayrshire’s vision for play. They have engaged with national and local partners to
support the development of this vision, creating leadership opportunities for
practitioners within the PLA (Professional Learning Academy) and our
establishments. 
North Ayrshire’s play pedagogy rationale was developed with senior leaders in the
central team, Professional Learning Academy staff and school personnel including
Head Teachers, Class Teachers, and Early Years Practitioners. 
The Professional Learning Academy facilitated a network to encourage practitioners
to engage in professional dialogue and support critical thinking and peer
collaborative learning. 
57

Page 58

4 of 10 
Staff within some schools have a strong commitment to play pedagogy. This includes
Head Teachers, Class Teachers, Early Years Practitioners and Classroom Assistants. 
We have several schools who can, and are eager to, share their journey of play and
support new adopters of this pedagogy. 
Local authority Quality Assurance visits have highlighted play as having a positive
impact upon raising attainment and pupil voice. 
Professional Learning to Support the Development of Play 
The central team in our Professional Learning Academy have undertaken training at
a national level to ensure they have sound pedagogical knowledge and skills to
provide training and support for early adopters of play in some of our schools. The
PLA staff also worked alongside our Early Years central team benefitting from their
experience and knowledge. This partnership then provided a team to take forward
the professional learning on offer to our school staff. 
Some of our early adopter schools who embarked on play last session were
provided with an Early Years Practitioner. The Early Years Practitioners were
appointed to SIMD 1 and 2 schools. All early adopter schools had access to a
teacher with experience in setting up play within the early stages of primary. This
was invaluable and staff within the establishments all recognise the importance of
being able to use the experience and skills of the Early Years Practitioners and the
teachers. 
Staff were supported to engage with documents such as Realising the Ambition, The
Early Years Framework, and the Play Strategy for Scotland. 
All staff in early adopter schools were provided with training sessions throughout the
year. These included establishing a play ethos, learning environments, observations,
planning, outdoor play and embedding literacy and numeracy. This has been
evaluated and next steps have been identified. 
Networks and trios were established to provide peer support. All practitioners speak
highly of these stating that they provided a space to share good practice, discuss
successes and highlight any issues or concerns. 
Several documents were developed to support the self-evaluation of play within
establishments. These were trialled and the environmental audit tool and How Good
is Our Play Pedagogy (HGIOPP) were received with enthusiasm. 
The PLA established a Play website. This contains signposting to good practice,
links to useful documents and case studies. A Teams page was also set up for
practitioners to access and share resources. 
Play Pedagogy in Practice 
58

Page 59

5 of 10 
Some early adopter schools received an Early Years Practitioner based within their
P1 classes, who modelled good practice for core school staff. The Early Years
Practitioners supported planning, adapting the environment, and developed
understanding of the importance of observing young people in play as a mode of
assessment. 
Over one third of our schools participated in our play pedagogy offer last session.
This demonstrates a positive appetite across the authority for the development of
this pedagogy in our schools. In addition, several other schools have accessed
training through the SWEIC (South-West Education Improvement Collaborative)
delivery and Professional Learning Academy twilight offer for pedagogical practice in
play. 
Some schools have demonstrated that a collegiate approach across the early level,
between the Early Years team and P1 staff demonstrates provision can be enhanced
through strong links and sharing of expertise. 
Our school leaders and practitioners have demonstrated professional courage to
start delivering play especially in context of both stretch aims and the measurement
culture. 
All establishments reported an improvement of their environments with a focus on
play. Staff were able to discuss the improvements made and the impact on children
and young people withing their settings. 
School leaders recognise that play has a positive impact on the emotional wellbeing
of the young people in their schools. They report that the young people have shown
increased motivation and a readiness to learn. Young people are also demonstrating
progress in their development within the four capacities.     
Quality Assurance and North Ayrshire’s Data Narrative 
Senior Officers with responsibility for the Quality Assurance of our schools identified
a need to create a self-evaluation document to support discussion about play in
schools. How Good is Our Play Pedagogy was developed to enable school staff to
self-evaluate their provision and consistently moderate the provision of play across
the authority. 
Establishments used the HGIOPP document to self-evaluate and although in the
initial stages of being used, schools who have used this report that this has
supported them to acknowledge their progress and identify next steps for play
pedagogy within their establishments. 
HGIOPP also provides a framework to support Senior Managers when conducting
Quality Assurance visits. 
This self-evaluation has shown that practitioners are increasing in confident in their
use of play pedagogy to support their delivery of learning and teaching. 
59

Page 60

6 of 10 
A few establishments have feedback from parents as part of their data set for play.
The feedback is extremely positive with parents acknowledging the worthwhile
impact this pedagogical practice has had on their children with many identifying how
their child is happy to go to school and that they demonstrate increasing
independence. 
Data was gathered for the early adopter schools and when comparing the milestones
entry data and the ACEL data at the end of P1, we can see that numeracy outcomes
improved. There has been an increase of 1.4 percentage points in the expected
numeracy attainment between children entering P1 and by the end of the academic
year. 
Data also showed that there was a rise in attainment of 2.9% for the schools who
received additionality of staff. 
One school has compared their SNSA data for the past 3 years. They use this as
evidence that play is raising attainment in both literacy and numeracy. This picture is
replicated in other schools who were part of North Ayrshires early adopters. Other
schools have similar data pictures. 
What is next? 
Leadership of Play 
North Ayrshire is committed to ensuring Play Pedagogy supports the delivery of
high-quality learning and teaching in our establishments. Whilst we have some
establishments who can share good practice, we do not have a consistent approach
and it is evident that not all leaders or practitioners have a good understanding of
play pedagogy. 
A Service Improvement Group will be established to develop a 3-year strategic plan
for the delivery of play pedagogy in North Ayrshire. This group will consist of senior
leaders and practitioners and will be led by a Senior Manager within the central team
with responsibility for Learning, Teaching and Assessment. This group will further
develop North Ayrshire’s vision and rationale for play pedagogical practice in our
establishments. The expectations of North Ayrshire schools in terms of the delivery
of play pedagogy will be clear and, appropriate support for the implementation of this
will be available. 
It has been acknowledged that the Service Improvement Group should also include
an Educational Psychologist to support research on pedagogy that is appropriate
developmentally to children to ensure impact. 
North Ayrshire’s updated play pedagogy vision will be shared with all school leaders.
Early adopters will share their journey and evidence their good practice. 
The Early Level of CfE is intended to support the implementation of a responsive,
continuous, play based curriculum from 3-6 years. It describes experiences and
outcomes for children’s learning in ways which have supported a more active, play-
60

Page 61

7 of 10 
based approach to learning and teaching. Early Years Practitioners have a wealth of
knowledge and skills that P1 staff and beyond would benefit from. As such we will
explore how we can maximise the impact of Early Years Practitioners’ skills and
expertise to support the development of play into P1. An emphasis will be placed on
the progression of Early Years to enable children and young people to develop their
capacities as successful learners, confident individuals, responsible citizens, and
effective contributors. 
We will review the trio model which was used by our early adopters which involved
Class Teachers, Early Years Practitioners and Classroom Assistants. We will
consider how this can be used to support practitioners to engage in professional
discussion to critically reflect and determine further developments in the successful
delivery of play pedagogy including planning approaches, tracking, interactions etc. 
Professional Learning to Support the Development of Play 
The principles and purposes of the Early Level are outlined in CfE and Realising the
Ambition. In practice establishments should have a shared rationale and a shared
language for play. This should be consistent across North Ayrshire. 
School staff highlighted training as being important and crucial to their journey. Their
experience, knowledge and skills should be captured to support and influence the
next iteration of play in North Ayrshire.   
Professional learning should be expanded to support the development of early years
environments focussing on interactions, experiences and spaces that support play
pedagogy. To smooth the transition from play based pedagogy in the early levels
into more traditional pedagogical approach in the latter stages of primary,
professional learning and training will be necessary. 
There is a clear requirement to develop further the skills of early years staff in
primary to use observations to assess children and young people within play. This
would strengthen our practitioners’ ability to identify what the child’s actions,
emotions and words are telling them about their development and their learning. In
addition to this, practitioners should be supported to develop their planning to ensure
it is led by their observations of the children in their class. Our practitioners will
become more skilled in interacting with the young people in their class. 
It is recognised that establishments will require varying level of CLPL to support
leaders and practitioners at various levels of understanding and engagement in the
play pedagogy journey.  Further consideration is required to support establishments
to support schools towards excellence. Feedback from schools involved in trios was
incredibly positive therefore this should be considered by the Service Improvement
Group within their planning to ensure practitioners can engage in professional
dialogue, share good practice and be solution focussed. 
North Ayrshire’s play pedagogy website will continue to provide a space for leaders
and practitioners to access information and research linked to play. This should be
expanded to include more case studies and evidence of good practice. We will
explore the idea of the website becoming more interactive with links to high quality
61

Page 62

8 of 10 
environments to support schools with no Early Years classes or those who are at the
start of their journey. Video links and photos will evidence high quality practice within
our authority. Realising the Ambition will become more explicit throughout the
website. 
Play Pedagogy in Practice 
There should be a commitment to ensuring that play pedagogy is understood by all
to deliver high quality learning and teaching particularly within the early level in
primary schools. 
North Ayrshire will provide establishments with a clear vision. We? will communicate
our? expectations with strong links to quality improvement processes to track and
monitor the progress of our schools in collaboration with school leaders and
practitioners. Moderation of practice will be considered as part of the trio
development. 
A focus on supporting staff to support the transition of pupils from Early Years setting
to P1 will ensure that our children and young people progressing into P1 will
continue their learning at the appropriate developmental level and pace. There is a
need for an improved trust and respect across Early Years staff in making
professional judgements about children’s development. The milestones should
provide information about pupil learning, and this should always be used effectively
to support our young people. There should be a shared understanding that this is the
responsibility of all Early Years staff. 
There is scope to enhance the use of digital technologies. This should be explored
by practitioners, and they should consider how to support the recording of children’s
voice during play (iPads, talking buttons etc...).  This may also be supportive if used
as a prompt to redirect children’s learning if the teacher is engaged in focused
groups. 
A focus should be on planning and assessment of play. This aspect needs further
consideration and development to ensure staff are not expected to provide two levels
of planning. Planning needs to be adapted to fit with the play pedagogy agenda. 
Quality Assurance and North Ayrshire’s Data Narrative 
The Service Improvement Group should consider carefully how the impact of play
will be measured. It is challenging to change well established ways of learning and
teaching and to enable us to do this we should deepen our understanding of what
learning looks like through play in different contexts and settings. The learning
environment will be central to supporting all young people to learn and reach their full
potential and as such we need to further develop our measurement tools to monitor
play and acknowledge that play cannot be simply measured by traditional attainment
data. 
We will consider ACEL data and formative testing alongside softer measures. We
need to raise awareness of how play may not impact on the attainment at Early
62

Page 63

9 of 10 
Level however research has shown that the progress rate within first level is often
much quicker. Gains may take time to see, and we should be prepared for this.
Pupils will be tracked from their progress in milestones through to CfE data over
several years. We will consider specific aspects of literacy and numeracy particularly
within language and communication. 
We currently have an observation document, based upon the Leuven Scale, for
practitioners to use within their establishments. However, this should be revisited. It
is currently not sufficiently capturing the breadth of skills that young people are
developing within their play. We should ensure that we are capturing the
development of young people including physical, social, emotional, cognitive and
creativity skills. To capture pupil progress, we should train our staff to use
observations more readily and robustly. 
We will revisit our How Good Is Our Play Pedagogy document and ensure that
Realising the Ambition is more explicitly referenced within it. We will work with our
senior leaders to ensure all establishments understand and are engaging with this
self-evaluation document. It will then be used as a moderation tool across the local
authority to identify gaps and establish consistent practice. CLPL can then be
targeted, and we will need to consider how we support establishments at various
stages of their journeys. The progress will be evaluated throughout the year. 
We will also consider measures such as: feedback, capturing data around parents’
interpretation of their children’s happiness, engagement, and wellbeing. 
Overall, we should ensure that we engage staff in agreeing on the relevance of data
collection and offer reassurance about utilising the naturally occurring data resulting
from play. 
Reflection on the process 
The collaborative improvement process has been exceptionally beneficial to the
Education Service. In general terms the team has validated our own self-evaluation
and endorsed our long-term vision. They have shared national best practice that can
now be used to enhance our approaches and these areas will be taken forward with
support from the team where beneficial. The team has also provided a helpful reminder
to pause and take stock of how far many have come and guided us to start to consider
arrangements to support good or particularly good settings to drive their own on-going
journey to excellence. 
What will happen next? 
This report will be shared with the sector, at a Head Teacher meeting, with the central
team and with the Children’s Services Strategic Partnership. 
A Service Improvement Group will be established to plan and oversee the work moving
on from this collaborative. 
63

Page 64

10 of 10 
Actions that can be taken forward with relative ease will be prioritised for completion
by June 2024, other areas will be used to inform Service Plan and School
Improvements Plans for 2024/25. 
The Education Service will engage with the ADES Officer and Education Scotland to
secure on-going support in areas agreed with them. 
64

Page 65

_____________________________________________________
NORTH AYRSHIRE COUNCIL
4th June 2024  
Cabinet
Title: Firework Control Zones
___________________________________________________________________
Purpose: To update Cabinet on the progress made with regard to the new
discretionary powers to designate Firework Control Zones and
seek Cabinet’s approval for the proposed process for handling
community requests.
Recommendation: That Cabinet notes the progress made with regard to the new
discretionary powers to designate Firework Control Zones and
approves the proposed process for handling community
requests and receive further update reports as the process is
refined.
___________________________________________________________________
1. Executive Summary
Local authorities now have discretionary powers to designate areas within their
boundaries as Firework Control Zones. Initial work has been undertaken to
assess these new powers and how they may be utilised. Cabinet’s approval is
now sought in respect of the proposed process for handling community
requests for Firework Control Zones.
2. Background
2.1 Part 4 of the Fireworks and Pyrotechnic Articles (Scotland) Act 2022 (the “Act”)
gives local authorities powers to designate Firework Control Zones. This part
of the Act came into force on 22 June 2023.
2.2 A Firework Control Zone (“FCZ”) is a designated area within a local authority’s
boundary in which it is a criminal offence for a member of the public to ignite a
firework. This includes fireworks ignited on private property within an FCZ, such
as a garden.
2.3 It is also an offence to fire a firework into the boundaries of an FCZ or to
knowingly or recklessly throw or cast a lit firework into a zone. A person who
commits an offence under the Act in relation to an FCZ is liable, on summary
Agenda Item 7
65

Page 66

conviction, to imprisonment for a maximum of 6 months or a fine of up to £5,000,
subject to any future changes to the standard scale. 
2.4 FCZs will not prevent a public firework display by a professional fireworks
operator or organised by a community group, sports club or other similar
organisation. FCZs will also not prohibit the use of category F1 fireworks. F1
fireworks include, for example, sparklers, indoor fireworks and party poppers.
The process
2.5 Local authorities must have regard to any guidance on FCZs issued by the
Scottish Ministers under section 33 of the Act when designating, amending or
revoking an FCZ. 
2.6 The Scottish Government published its “Firework Control Zones – Guidance for
Local Authorities” on 22 June 2023 (the “Guidance”). The Guidance
emphasises the importance of partnership working with Police Scotland, the
Scottish Fire and Rescue Service and other key stakeholders when
designating, amending or revoking an FCZ. Input from partners will help the
Council understand the feasibility of enforcing a potential FCZ, and discussions
around enforcement should underpin the consideration of any proposal. 
2.7 The geographic extent and operational dates of any proposed FCZ must be
evidence-based and proportionate, and it is envisaged that the local authority
will have regard to Police and Fire reports (among other evidence sources)
when considering the designation of an FCZ. 
2.8 Local authorities are expected to take a proportionate and balanced approach
when deciding whether an FCZ is likely to be the best approach to a specific
firework issue. The Guidance sets out existing alternative approaches to
tackling issues around fireworks which should also be considered, including
community engagement and awareness raising, targeted use of police and fire
service resources, dispersal zones, retailer compliance checks, educational
input at primary and secondary schools, youth intervention visits, restorative
justice initiatives and utilising existing multi-agency approaches such as
Operation Moonbeam.
2.9 Once an FCZ is in place, the local authority must carry out regular reviews of
its operation and effectiveness. Reviews should be undertaken in partnership
with local police, fire and rescue, community organisations and other local
stakeholders. The Guidance suggests local authorities may wish to utilise
existing partnerships, such as a community planning partnership, community
justice partnership, or community safety partnership, to support any such
review.
Work to date
66

Page 67

2.10 A working group of officers has been established to consider the
implementation of these new discretionary powers.
2.11 Officers have met with representatives from Police Scotland and Scottish Fire
and Rescue Service to seek initial views on whether any FCZs are required in
North Ayrshire. The evidence presently available does not appear to indicate a
need to consider the proactive designation of an FCZ in North Ayrshire,
however this may change in future and shall be kept under review. 
2.12 Officers have met with representatives from the Scottish Government to discuss
the approach being taken to the designation of zones and associated
processes. Discussions are ongoing with Police Scotland regarding the
framework for information sharing for the purposes of FCZs.
2.13 There are ongoing reports being brought to the Police and Fire and Rescue
Committee regarding Operation Moonbeam and regular updates provided
regarding the planning for bonfire night in North Ayrshire. Reports evidence a
proactive engagement with communities in North Ayrshire regarding firework
safety and clean-up operations etc. There is already a close working
relationship between North Ayrshire Council and Police Scotland and Scottish
Fire and Rescue Service.
Community Requests
2.14 The Guidance states that, where possible, local authorities should establish a
local process to give communities the ability to make the case for the
designation of an FCZ through a “community request”. A process therefore
requires to be established to facilitate community requests in North Ayrshire
and to consider any requests received. 
2.15 The Guidance is not prescriptive about the format of a community request.
Officers intend to develop an application form that will be available on the
website to assist communities to provide the relevant information required to
support their application. While the form is being developed, communities will
have the option of submitting a request via email, and officers will work with
groups to ensure that sufficient information and evidence is provided.
2.16 Upon receipt of a community request, it is proposed that officers will conduct
an initial screening. If the request is valid, officers will seek input from relevant
stakeholders on the proposal to assist in the preparation of a Cabinet report.
Cabinet would be asked to decide whether to take the community request
forward. 
2.17 Where a decision is made not to take forward a community request, the
community must be given the opportunity to request a review of the decision. It
is proposed that community groups be given the right to appeal such a decision
to the Audit and Scrutiny Committee. If Cabinet is agreeable to this in principle,
67

Page 68

then a report will be presented to Council seeking authority for the appeals
process to be remitted to the Audit and Scrutiny Committee.
2.18 Where the decision is taken to proceed with consideration of an FCZ proposal,
the local authority must develop the proposal and undertake a consultation. It
is proposed that this work would be carried out by officers. Thereafter, officers
would require to consider and analyse the consultation responses, prepare a
consultation report, present to Committee for decision and thereafer publicise
the decision of whether or not to designate an FCZ. The decision must be
publicised at least 60 days before the FCZ comes into force. The Guidance
does not require a mechanism for this decision to be appealed, although there
is an obligation to keep any FCZs under review, as outlined at paragraph 2.9
above.
3. Proposals
3.1 That Cabinet approves the proposed process for handling community requests
and receive further update reports as the process is refined.
4. Implications / Socio-economic Duty
Financial
4.1 Should any FCZ proposals be progressed during the current financial year,
there is funding available from the Scottish Government in respect of
consultation and set up costs.  
Human Resources
4.2 The proposals outlined above would be met with existing resources.
Legal
4.3 The publication of a decision to designate a FCZ is sufficient to bring it into
force. Legal advice will be provided as required on the terms of the legislation
and guidance. 
Equality / Socio-economic
4.4 None arising from this report, although individual proposals for the designation
of FCZs may impact.
Environmental and Sustainability
4.5 None arising from this report, although individual proposals for the designation
of FCZs may impact.
Key Priorities
4.6 The proposals outlined in this report support the Council’s priority of
communities and local democracy.
68

Page 69

Community Wealth Building
4.7 None.
5. Consultation
5.1 Any proposal to designate a FCZ will be consulted on.
Aileen Craig
Head of Service, Democratic Services
For further information please contact Raymond Lynch, Senior Manager
(Legal Services) by email to raymondlynch@north-ayrshire.gov.uk.
69

Page 70

70

Page 71

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet 
Title:    Revenue Budget 2023/24 : Financial Performance to 31
March 2024 
Purpose:  To advise Cabinet of the financial performance for the Council
for 2023/24. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial outturn position outlined
in the report; 
(b) approve the earmarking of £5.486m identified at 2.5 to
meet future year commitments;
(c)  note the financial performance of the Health and Social
Care Partnership highlighted at 2.6; 
(d)  note the virements detailed in Appendix 7. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2023/24 were approved by Council on 1
March 2023. The Housing Revenue Account (HRA) Revenue Budget for 2023/24 was
approved by Council on 15 February 2023. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the final report for 2023/24 and covers the period to the end of March
2024 (Period 12). This is the final financial performance information on which the
annual accounts for the Council will be prepared. 
1.3   At Period 12 the General Fund is reporting a net in-year breakeven position after
transferring resources to/from earmarked reserves. This is an improvement of
(£0.146m) from that reported at Period 10 and is primarily related to improved income
recovery across a number of services and lower than anticipated utilisation of centrally
held inflation provisions. 
1.4  The Housing Revenue Account is reporting a net in-year underspend of (£6.881m)
(11.8%). This is a movement of (£0.711m) from the underspend reported at Period 10.
The movement is primarily related to an under recovery of rental income and revised
Capital Charges, partly offset by reduced expenditure on repairs. The underspend will
be added to the HRA earmarked balances to support service delivery in future years.
Agenda Item 8
71

Page 72

1.5  At Period 10 the Health and Social Care Partnership reported a projected overspend
of £4.171m. Work is ongoing to confirm the final outturn position for the year and the
HSCP is awaiting final confirmation of the NHS budget outturn. It is anticipated that
the Integration Joint Board (IJB) will draw the full overspend from available reserves,
resulting in an in-year net breakeven position for the HSCP. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2023/24. In addition to the budget approved
on 1 March 2023, earmarked funds of £26.697m were carried forward from 2022/23
for service expenditure in 2023/24 and are reflected in the figures within the 2023/24
financial performance reports as they are drawn down. 
2.2 A net in-year breakeven position is reported, net of transfers to/from reserves. The
following table details the final position on a service by service basis: 
App.
No
Annual
Budget
Actual
Outturn to 
31 March
2024
Variance
for year
(Fav)/Adv
Projected
Variance
at P10
(Fav)/Adv
Movement New
Requests
for Carry
Forward
Variance
for Year
After Carry
Forward
(Fav)/Adv
Service Expenditure £000's £000's £000's £000's £000's £000's £000's
Chief Executive's 1    24,243     23,288        (955)       (864)         (91)         518          (437)
Communities 2  186,848   187,166          318          687        (369)           72           390
Place 3    61,671     62,937       1,266       1,504        (238)         386        1,652
Other Corporate
Services 4    17,023     10,891      (6,132)     (1,228)     (4,904)      4,510       (1,622)
Sub Total  289,785   284,282      (5,503)           99      (5,602)      5,486            (17)
Health and Social Care
Partnership  124,933   124,933              -              -              -              -                -
Balance for Services  414,718   409,215      (5,503)           99      (5,602)      5,486            (17)
Financing Charges 5    22,172     22,172              -              -              -              -                -
Contribution to Loans
Fund Reserve 5      8,089       8,089              -              -              -                -
Total Planned
Expenditure  444,979   439,476      (5,503)           99      (5,602)      5,486            (17)
Planned Income
Aggregate External
Finance 5 (356,579) (356,577)            2              -             2              -               2
Council Tax 5   (65,533)   (65,518)           15            47          (32)             -             15
Contribution to Capital
Fund 5         225          225              -              -              -              -                -
Contribution to/from
Earmarked Funds 5   (23,092)   (23,092)             -              -              -              -                -
Total Planned Income (444,979) (444,962)           17            47          (30)             -             17             
-      (5,486)     (5,486)         146      (5,632)      5,486                - Net Expenditure/ (Income)
72

Page 73

2.4 The reported Aggregate External Finance within Planned Income includes a number of
adjustments to Scottish Government funding from that reported at Period 10, as detailed
in the following table: 
2.5 Commentary on Significant Movements from the Approved Budget 
Detailed explanations of the significant variances in service expenditure compared to
the approved budgets, together with information on funding to be carried forward to
support expenditure during 23/24, are provided in appendices 1 to 5 to this report. A
full list of the proposed carry forward of earmarked funds is included at Appendix 5.   
A brief explanation of the significant movements for each service since Period 10 is
outlined as follows: 
(i) Chief Executive’s – underspend of (£0.955m), an increase of (£0.091m) from
the previously reported underspend. 
The movement since Period 10 is primarily related to: 
• Lower than anticipated expenditure on Elections, (£0.097m); 
• Reduced expenditure on Occupational Health, (£0.067m); and
• Vacancy management across services, (£0.049m). 
These were partly offset by increased Bad Debt Provision in relation to Council
Tax Statutory Additions, £0.197m. 
It is requested that £0.518m of the underspend is earmarked to support
anticipated additional expenditure during 2024/25 in relation to: 
• Inflationary pressures in ICT contracts, including software and M365, £0.354m;
• Contribution to the Elections Fund to support future requirements, £0.102m;
and
• Inflationary pressures on Occupational Health contracts, £0.062m. 
Non Domestic
Rates
Specific
Grants TOTAL AEF
£000's £000's £000's
Revised Budget 31 January 2024 (292,082)       (40,982)         (19,940)         (353,004)      
Movements:
PEF Carry Forward 195               195              
DHP Accrual (610)              (610)             
Firework Control Zones (10)                (10)               
Islands Cost Crisis Emergency (57)                (57)               
Local Government Pay Award (1,948)           (1,948)          
School Staff Training (22)                (22)               
CJSW Adjustment 70                 70                
NDR Empty Property Relief Adjustment (1,193)           (1,193)          
Final Scottish Government Income (295,922)       (40,982)         (19,675)         (356,579)      
General Revenue
Grant
£000's
73

Page 74

(ii) Communities – overspend of £0.318m, a reduction of (£0.369m) from the
previously reported overspend. 
The movement since Period 10 is primarily related to: 
• Increased Facilities Management Income, (£0.419m);
• Lower than anticipated expenditure across Connected Communities Supplies &
Services and Third Party Payments, (£0.155m);
• Reduced non teaching staff costs within Primary Schools, (£0.144m);
• Increased income from other Local Authorities, (£0.076m). 
These have been partly offset by: 
• Increased teacher cover costs, £0.280m; and
• Increased PPP costs related to NDR and utility cost increases, £0.127m. 
It is requested that £0.072m is earmarked to support anticipated additional
expenditure during 2024/25, including: 
• Connected Communities Community Grants, £0.042m; and
• Cost of the School Day – support for ongoing programmes, £0.030m. 
Virements in relation to additional income across the service have been included
within Appendix 7. 
(iii) Place – overspend of £1.266m, a reduction of (£0.223m) from the previously
reported overspend. 
The net movement since Period 10 is primarily related to: 
• Increased Planning income, (£0.174m);
• Vacancy management across services, (£0.166m);
• Reduced level of overspend on Statutory Compliance, (£0.116m); and
• Reduced Regeneration expenditure linked to project delays, (£0.065m). 
These have been partly offset by: 
• Reduced project income within PMI, £0.144m;
• Increased service charges, £0.118m; and  
• Increased Winter Maintenance costs, £0.56m. 
It is requested that £0.386m is earmarked to support anticipated additional
expenditure during 2024/25, including: 
• Planning application fees received in advance, £0.147m;
• Community Wealth Building to support delivery of the Repurposing Property
Grant Fund, £0.121m; and
• Rapid Rehousing Transition Plan linked to the 5 year RRTP delivery
programme, £0.118m. 
74

Page 75

Virements in relation to the recognition of additional income budgets within Roads,
Employability and the Ayrshire Growth Deal have been included within Appendix
7. 
(iv) Other Corporate Items – underspend of (£6.132m), an increase of (£4.904m)
from the previously reported underspend. 
The movement since Period 10 is primarily related to: 
• Additional Scottish Government grant income, (£2.913m);
• Reduced centrally funded severance costs, (£0.740m);
• Reduced drawdown of centrally held inflationary provisions, (£0.681m);
• Increased income from recharges to other services, (£0.294m); and
• Increased Housing Benefit income related to supported accommodation claims,
(£0.276m). 
It is requested that a further £4.510m is earmarked to support anticipated additional
expenditure during 2024/25, including: 
• Workforce planning costs to support the review of Early Learning and Childcare
services, £1.700m;
• Provision for the potential repayment of Housing Benefit income in relation to
supported accommodation claims, £0.500m;
• Contribution to Change and Service Redesign Fund, £0.399m;
• Provision for initial startup costs and income recovery levels  associated with
the Foxgrove (National Secure Adolescent Inpatient Service) unit due to
become operational during 2024, £0.250m;
• Inflation provision in relation to the Arran Local Bus Service contract, £0.204m;
• Previously approved budget allocation to support future service delivery in
relation to the CCTV Review, £0.050m; and
• Scottish Government grant income to support 24/25 service delivery, £1.407m,
(including Ukrainian Resettlement £0.864m, Employability Staffing £0.394m,
Summer Activities £0.049m, Islands Cost Crisis Emergency £0.039m, DWP
funding £0.036m, Educational Psychologists £0.015m and Firework Control
Zones £0.010m). 
Health and Social Care Partnership 
2.6 The final HSCP financial performance report for the year will be presented to the
Integration Joint Board on 13 June 2024 and will outline the 2023/24 financial
performance in more detail. At Period 10 the HSCP reported a projected overspend of
£4.171m. Work is ongoing to confirm the final outturn position for the year and the
HSCP is awaiting final confirmation of the NHS budget outturn. It is anticipated that
the Integration Joint Board (IJB) will draw the full overspend from available reserves,
resulting in an in-year net breakeven position for the HSCP. 
75

Page 76

Housing Revenue Account 
2.7  The Housing Revenue Account budgeted for a breakeven position in 2022/23. An
underspend of (£6.881m), net of transfers to/from reserves, has been reported. This is
a movement of (£0.711m) from the previously reported underspend position and is
summarised in the following table with further details provided in Appendix 6. The
underspend will be added to the HRA earmarked balances to support delivery of the
HRA Business Plan. 
2.8 Commentary Significant Movements from the Revised Budget 
Detailed explanations of the significant variances in expenditure compared to the
approved budgets are provided in appendix 6 to this report. 
A brief explanation of the significant movements for each service since Period 10 is
outlined as follows: 
(i) Employee Costs – underspend of (£0.522m), an increase of (£0.059m) from
the previously reported underspend 
The movement is primarily related to vacancy management across the service. 
(ii) Property Costs – overspend of £0.798m, a reduction of (£0.640m) from the
previously reported overspend 
The movement is primarily related to reduced expenditure on Planned & Cyclical
Maintenance, (£0.165m), Responsive Repairs, (£0.089m), Aids & Adaptations,
(£0.054m) and Other Property Costs, (£0.370m). 
Annual
Budget
Actual
Outturn to 
31 March
2024
Variance
for year
(Fav)/Adv
Projected
Variance at
P10
(Fav)/Adv
Movement Note
£000's £000's £000's £000's £000's
Employee Costs       5,482        4,960         (522)        (463)          (59) (i)
Property Costs     22,842      23,640           798        1,438         (640) (ii)
Supplies & Services          568           370         (198)            20         (218) (iii)
Transport Costs            28             15           (13)              -           (13)
Administration Costs       1,892        1,915             23             26             (3)
Third Party Payments       3,519        3,366         (153)        (176)            23
Transfer Payments          172           156           (16)              -           (16)
Other Expenditure          380           661           281               -           281 (iv)
Capital Financing Costs     23,310      15,518       (7,792)      (7,059)        (733) (v)
Gross Expenditure     58,193      50,601       (7,592)      (6,214)      (1,378)
Income    (58,193)    (57,482)          711             44           667 (vi)
Income    (58,193)    (57,482)          711             44           667
Net Expenditure              -       (6,881)      (6,881)      (6,170)        (711)
76

Page 77

(iii) Supplies & Services – underspend of (£0.198m), an increase of (£0.218m)
from the previously reported overspend 
The movement is primarily related to lower than anticipated expenditure on
computer equipment and software licences, (£0.171m). 
(iv) Other Expenditure – overspend of £0.281m, a movement of £0.281m from
the previously reported breakeven position 
The movement is primarily related to increased provision of Bad Debts, £0.281m. 
(v) Capital Financing Costs – underspend of (£7.792m), an increase of
(£0.733m) from the previously reported underspend 
The movement is primarily related to revised loan charges reflecting expenditure
on the HRA Capital Programme. 
(vi) Income – underrecovery of £0.711m, an increase of £0.667m from the
previously reported underrecovery 
The movement is primarily related to the under recovery of Rental Income,
£0.426m, as a result of protracted and long term voids, together with reduced
income from Recharges, £0.080m and Other Income, £0.153m. 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a) note the information and financial outturn position outlined in the report; 
(b) approve the earmarking of £5.486m identified at 2.5 to meet future year
commitments;
(c) note the financial performance of the Health and Social Care Partnership
highlighted at 2.6; 
(d) note the virements detailed in Appendix 7. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The final outturn position for the year is a net breakeven position after transfers to and
from earmarked reserves. 
Housing Revenue Account
The final outturn position for the year is a net underspend of (£6.881m). 
Human Resources 
4.2 None.
77

Page 78

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2023/24 : Financial Performance to 31 January 2024 - Cabinet 19 March
2024
78

Page 79

Appendix 1
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 164              173              9                      5%
Total for Chief Executive 164              173              9                      5%
Financial Services
Change Programme 358              358              -                      0%
Audit, Fraud, Safety & Insurance 1,091           1,108           17                    2%
Corporate Procurement 1,127           1,070           (57)                  (5%) 1         
Financial Services 1,666           1,599           (67)                  (4%) 2         
Revenues (390)             (340)             50                    (13%) 3         
Transformation 822              797              (25)                  (3%) 4         
Total for Financial Services 4,674           4,592           (82)                  (2%)
People & ICT
Employee Services 1,127           1,125           (2)                    (0%)
HR & Organisational Development 1,151           1,082           (69)                  (6%) 5         
ICT 5,984           5,575           (409)                (7%) 6         
Business Support 1,675           1,676           1                      0%
Customer Services 4,870           4,878           8                      0%
Total for People & ICT 14,807         14,336         (471)                (3%)
Democratic Services
Legal & Licensing 905              829              (76)                  (8%) 7         
Policy, Performance & Elections 567              399              (168)                (30%) 8         
Communications 506              508              2                      0%
Civil Contingencies 60                57                (3)                    (5%)
Committee Services 645              543              (102)                (16%) 9         
Member Services 1,352           1,331           (21)                  (2%)
Ayrshire Support Service 505              482              (23)                  (5%)
Information Governance 58                38                (20)                  (34%)
Total for Democratic Services 4,598           4,187           (411)                (9%)
Totals 24,243         23,288         (955)                (4%)
Less Proposed Carry Forwards 518              518                 
Net Total 24,243         23,806         (437)                (2%)
79

Page 80

Appendix 1
Subjective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 19,526         19,165         (361)                (2%)
Property Costs 82                106              24                    29%
Supplies and Services 3,497           3,055           (442)                (13%)
Transport and Plant Costs 20                12                (8)                    (40%)
Administration Costs 1,428           1,363           (65)                  (5%)
Other Agencies & Bodies 2,838           2,760           (78)                  (3%)
Transfer Payments 887              887              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 28,278         27,348         (930)                (3%)
Income (4,035)          (4,060)          (25)                  1%
Net Expenditure 24,243         23,288         (955)                (4%)
80

Page 81

Appendix 1a
CHIEF EXECUTIVES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Budget
£000  
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement - There has been no significant movement since P10.
1,097 (59) -5% Employee costs - There is a projected underspend of £0.059m due to vacancy management. 
2 Other minor movements
(57)
Note 2 Finance - Financial Services
Movement - There has been a favourable movement of £0.037m since P10 due to an over recovery in income.
1,551 (28) -2% Employee costs - There is an underspend of £0.028m due to vacancy management. 
(108) (30) 28% Income - There is a £0.030m over recovery in recharges to other council funds.
(9) Other minor movements
(67)
Note 3 Finance - Revenues
Movement - There has been an unfavourable movement of £0.197m since P10 due to increased Bad Debt
Provision for Council Tax Statutory Additions.
(1,285) 79 -6%
Income - There is an under recovery in Council Tax Statutory Additions of £0.156m arising from an increase in
BDP for both current and prior years. This has been partially offset by an over recovery in Scottish Water
income of £0.070m.
(29) Other minor movements
50
Note 4 Finance - Transformation
Movement - There has been no change since P10
795 (25) -3% Employee Costs - There is an underspend of £0.025m due to salaries being paid by external funding in the
year.
(25)
Note 5 People & ICT - HR & Organisational Development
Movement - There has been a favourable movement of £0.067m from P10 as a result of the underspends in
payments to Optima Health.
413 (65) -16% Third Party payments - There is an underspend of £0.065m against payments to Optima Health due to a
reimbursement following a reconciliation of the provision.
(4) Other minor movements
It is requested to earmark £0.062m of the underspend to support anticipated Occupational Health contract
inflation pressures in 2024/25.
(69)
Note 6 People & ICT - ICT
Movement - There has been a favourable movement of £0.036m from P10 due to lower than forecasted
contract renewal costs and various vacancies.
2,248 (380) -17%
Supplies & Services -  There is a £0.258m underspend in software licenses and support due to contracts
ending and renewing at a lower cost.  There is also a £0.053m underspend in WAN due to the upgrade project
and £0.043m underspend in LAN due to lower costs than anticipated.
(29) Other minor movements
It is requested to earmark £0.354m to fund anticipated software cost increases, increased costs of M365, SOC
Procurement and Project Resource.
(409)
Note 7 Democratic Services - Legal & Licensing
Movement - There has been no significant movement since P10.
1,419 (37) -3% Employee Costs - There is an underspend of £0.037m due to vacancy management.
(535) (50) 9%
Income - There is an over-recovery of £0.114m in Licensing income mainly due to new licence income for
Short Term Lets, which is offset with an under recovery of £0.017m in Recovery of Legal Costs, an under-
recovery of £0.015m in Sales Fees and Charges, and £0.030m in Licensing Board Income.
11 Other minor movements
(76)                 
81

Page 82

Appendix 1a
Budget
£000  
Variance
£000
Variance as
% of budget Section
Note 8 Democratic Services - Policy, Performance & Elections
Movement - There is a favourable movement of £0.049m from P10 mainly in Employee costs due to
vacancies.
512 (159) -31% Employee Costs - There is an underspend of £0.159m due to vacancy management.
(9) Other minor movements
(168)               
Democratic Services - Committee Services
Movement - There is a favourable movement of £0.097m since P10 mainly due to underspend in Election
Costs.
92 (102) -111% Election Costs - There has been an underspend of £0.102m in relation to Election Costs.
It is requested to earmark £0.102m for future Election commitments.
(102)               
Note 9
82

Page 83

Appendix 2
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 21,902         21,247         (655)                (3%) 1         
Primary Education 49,233         49,383         150                 0% 2         
Secondary Education 56,405         56,504         99                   0% 3         
Additional Support Needs 14,910         15,499         589                 4% 4         
Education - Other 3,805           5,319           1,514              40% 5         
Pupil Equity Fund 4,419           4,419           -                      0%
Facilities Management 19,554         18,288         (1,266)             (6%) 6         
-                   -                  
Connected Communities 16,544         16,389         (155)                (1%) 7         
Net Total 186,848       187,166       318                 0%
Less Proposed Carry Forwards 72                72                  
Net Total 186,848       187,238       390                 0%
Subjective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 97,099         99,453         2,354              2%
Employee Costs - Non Teachers 64,477         62,803         (1,674)             (3%)
Property Costs 2,643           2,829           186                 7%
Supplies and Services 17,445         16,903         (542)                (3%)
Transport and Plant Costs 158              197              39                   25%
Administration Costs 887              774              (113)                (13%)
Other Agencies & Bodies 15,571         16,310         739                 5%
Transfer Payments 580              495              (85)                  (15%)
Other Expenditure -                   -                   -                     
Capital Financing 71                70                (1)                    (1%)
Gross Expenditure 198,931       199,834       903                 0%
Income (12,083)        (12,668)        (585)                5%
Net Expenditure 186,848       187,166       318                 0%
83

Page 84

Appendix 2a
COMMUNITIES
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been no significant movement since P10.
16,956 (318) -2% Employee Costs: underspend  in establishments due to vacancy management.
4,672 (243) -4%
Third Party Payments:  underspends of £0.347m in payments to funded providers and £0.059m in payments to
other bodies for current registered children reflects the current trend in decreasing population. Payments to
other Local Authorities  overspend of £0.171m as more children taking up Early Years places outwith North
Ayrshire than children coming into NAC Early Years establishments.
(239) (44) 18% Income: over recovery primarily due to income from other Local Authorities
(50) Other minor movements: various underspends across admin (£0.033m) & supplies & services (£0.017m)
budget lines
A reduction to the budget of £1.198m in 23/24 necessitated a drawdown from Education earmarked funds
pending permanent savings to be implemented for 24/25. Service redesign proposals have been developed to
be implemented by August 2024
(655)
Note 2 Primary Education
Movement : There has been a favourable movement of £0.141m compared to P10 .  This is primarily due to
further underspends across employee costs.
47,599 48 0% Employee Costs :  overspend in teacher costs of £0.412m offset against underspend in non teaching costs of
£0.363m of which £0.164m is due to delays in recruitment for School Dining Supervisors
1,469 94 6% Supplies & Services: projected overspend in the PPP unitary charge mainly due to NDR and utility increases.
All PPP costs are offset against penalty deductions shown in the Education Other section below.
8 Other minor movements
150
Note 3 Secondary Education
Movement : There has been a unfavourable movement of £0.127m compared to P10 mainly due to an
increase in the reported PPP costs
48,333 (151) 0% Employee Costs : underspend in non teaching costs across all Secondary Schools.
7,876 236 3% Supplies & Services: £0.217m overspend in the PPP unitary charge mainly due to NDR and utility increases.
All PPP costs are offset against penalty deductions shown in the Education Other section below.
14 Other minor movements
99
Note 4 ASN
Movement: There has been a favourable movement of £0.107m compared to P10. This is mainly due to an
increase of £0.076m in Other Local Authority section 23 income
12,442 (328) -3%
Employee costs :  Underspend of £0.267m in non teaching staff costs across all ASN school and bases
provision and £0.062m underspend in teaching costs. The increased cost pressure for Classroom Assistants of
£0.874m is managed this year by drawing down a temporary amount from earmarked funds. This position has
been addressed as part of the 24/25 budget process.
355 (55) -15% Payments to Other Local Authorities : There is an underspend of £0.055m on payments to Other Local
Authorities due to a reduction in the number of NAC children accessing placements in their establishments.
1,003 101 10% Day Placements : There is an overspend of £0.101m on external day placements as a result of additional
children requiring this level of support and an increase in rates from these establishments.
499 1,052 211%
Residential Placements : There is an overspend of £1.052m on external specialist residential placements. 
Currently there are 16 children in accommodation.  Increased pressures on internal care settings as well as
changing needs of children and young people have resulted in an increase in the need for external residential
settings. Joint working is ongoing with HSCP to ensure that all options are fully explored to ensure that all
options are considered to retain young people within their local community where possible.  Where this is not
possible, a forum has been set up to further discuss those young people who will require care and education
provision to support them appropriately. Any future additional children who enter Residential Accommodation
will increase the future overspend.
(264) (176)
Income : There is an over recovery of £0.176m in Other Local Authorities income due to the number of other
authority children accessing a place in NAC establishments and increased rates being applied for the 2023/24
session.
(5) Other minor movements.
589
84

Page 85

Appendix 2a
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 5 Education Other
Movement :There has been a unfavourable movement of £0.280m compared to P10. This is mainly due to
increased teacher cover costs.
2,542 1,822 72%
Employee costs: overspend in teachers HQ cover of £1.980m associated with mandatory cover for teacher
absence offset by  £0.156m underspend across non school establishments. Absence levels are subject to
regular review across the service and appropriate actions are taken to maximise attendance
580 (85) -15% Transfer Payments : underspend against EMA payments made. This is offset against an under recovery of
government grant below.
(1,751) (255) 15%
Income: PPP insurance rebate £0.097m, PPP deductions of £0.217m in excess of budget, £0.025m salaries
received from capital. This is offset against less grant received (£0.085m) in respect of EMA to match the
transfer payments underspend.
32 Other minor movements.
It is requested to earmark £0.030m Cost Of the School Day funds to reflect the delay in expenditure and
support the ongoing programmes.
1,514
Note 6 Facilities Management
Movement: There has been a favourable movement of £0.419m with P10 mainly due to increased recovery of
income and reduction in expected bad debt.
15,994 (341) -2% Employee Costs:  underspend of £0.341m primarily due to recruitment challenges and a targeted reduction of
overtime and casual costs.
1,057 91 9% Property Costs: There is a £0.091m overspend due to an increase in material and supplies costs.
5,094 (713) -14%
Supplies and services: There is a saving of £0.212m in food mainly due to school meal uptake remaining lower
than target. In addition, there is an underspend within Early Years of £0.455m which has arisen due to lower
attendance rate than anticipated. There is also an underspend of £0.058m in software licences.
(2,706) (322)
Income: There is an under-recovery in commercial catering income of £0.127m due to a reduction in
commercial events and cost/income challenges within commercial venues. This is offset by an over-recovery of
cleaning and janitorial income of £0.171m and £0.165m saving due to lower bad debt than anticipated. There is
also £0.113m in higher income from schools and social services income.
19 Other minor movements
(1,266)
Note 7 Connected Communities
Movement: There has been a favourable movement of £0.155m compared to P10.  This is a result of reduced
spend across many budgets held within supplies and services of £0.087m and third party payments of
£0.066m.
9,209 (210) -2% Employee Costs: underspends across all sectors due to vacancy management.
1,305 94 7%
Property Costs: £0.040m overspend in Libraries, £0.021m overspend in Country Parks on property repairs and
Community Garden electricity costs, £0.027m overspend in Community Facilities, which is mainly on cleaning
materials and £0.006m overspend in Arts.
1,278 (87) -7%
Supplies and Services: underspend across various budget lines in Libraries £0.047m, Community
Development £0.023m,  Participation & Empowerment £0.034m, offsetting small overspends in a number of
budget lines across the service £0.016m
6,953 (66) -1% Third Party Payments: There are a number of overspends across various budget lines amounting to £0.103m
which are offset by underspends across various budget lines amounting to £0.170m
2,340 141 6% Income: £0.330m under recovery across various sectors of the Service offset against £0.189m over recovery
across various sectors of the Service
(27) Other minor movements.
It is requested to earmark £0.042m of the Grants General budget (3rd Party Payments)
(155)
85

Page 86

Appendix 3
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 8                  -                   (8)                    (100%)
Housing and Public Protection
Building Services (2,527)          (2,532)          (5)                    0% 1         
Property Governance 41                41                -                      0%
Planning Services 420              92                (328)                (78%) 2         
Protective Services 1,859           1,621           (238)                (13%) 3         
Other Housing 4,020           3,974           (46)                  (1%) 4         
Total for Housing and Public Protection 3,813           3,196           (617)                (16%)
Neighbourhood Services
Roads 8,943           9,077           134                 1%
Streetscene 6,206           6,340           134                 2% 5         
Waste Resources 10,026         10,574         548                 5% 6         
Municipalisation Advertising (123)             (21)               102                 (83%) 7         
Total for Neighbourhood Services 25,052         25,970         918                 4%
Economic Development, Growth and
Investment
Economic Policy 342              257              (85)                  (25%) 8         
Employability & Skills 2,753           2,749           (4)                    (0%)
Regeneration 1,500           1,369           (131)                (9%)
Business 1,484           1,484           -                      0%
Growth & Investment 403              387              (16)                  (4%)
Total for Economic Development, Growth and
Investment 6,482           6,246           (236)                (4%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 2,115           2,280           165                 8%
Housing Assets & Investment (18)               8                  26                   0%
Property Maintenance (133)             441              574                 (432%) 9         
Property Running Costs 5,615           5,819           204                 4% 10       
Energy and Sustainability 8,201           8,201           -                      0% 11       
Internal Transport 10,536         10,776         240                 2% 12       
Total for Sustainability, Transport and Corporate
Property 26,316         27,525         1,209              5%
Net Total 61,671         62,937         1,266              2%
Transfer to Earmarked Reserves 386              386                
Net Total 61,671         63,323         1,652             
86

Page 87

Appendix 3
Subjective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 52,125         53,959         1,834              4%
Property Costs 23,697         24,957         1,260              5%
Supplies and Services 10,392         10,665         273                 3%
Transport and Plant Costs 10,176         11,277         1,101              11%
Administration Costs 2,211           2,221           10                   0%
Other Agencies & Bodies 25,596         25,938         342                 1%
Transfer Payments -                   -                   -                      0%
Other Expenditure 182              283              101                 55%
Capital Financing 65                63                (2)                   
Gross Expenditure 124,444       129,363       4,919              4%
Income (62,773)        (66,426)        (3,653)             6%
Net Expenditure 61,671         62,937         1,266              2%
87

Page 88

Appendix 3a
PLACE
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no significant movement since P10.
5,345 102 2%
Supplies & Services: An overspend of £0.102m in supplies and services. This is due to an overspend of
£0.059m in tools and implements, £0.021m in employee clothing and £0.095m in other supplies and services
costs. This is partially offset by an underspend of £0.073m in materials.
579 155 27% Transport costs: An overspend of £0.155m in transport costs. This is due to an overspend of £0.041m in
scaffolding which relates to factoring works, £0.048m in skip hire costs and £0.066m in other transport costs.
2,833 283 10% Third Party Payments: An overspend of £0.283m in third party payments is largely in relation to an increase in
the volume of void and damp work.
(21,515) (548) 3% Income: An over recovery in income of £0.548m largely in relation to the volume and scope of void and damp
works and other increased costs.
3 Other minor movements
(5)
Note 2 Planning Services
Movement: There has been a favourable movement of £0.174m since P10 mainly due to an increase in
planning fee income.
824 (28) (3%) Employee Costs: Underspend of £0.028m due to vacancy management.
(609) (292) 48% Income: Over recovery of £0.301m in additional planning fee application income.
(8) Other minor movements
It is requested to earmark £0.147m of internal planning application fees income. Other council services have
already paid for work that will not be carried out until 2024/25.
(328)
Note 3 Protective Services
Movement: There has been a favourable movement of £0.126m since P10 which is primarily due to £0.078m of
further recharge costs to HRA and £0.043m in staffing.
2,855 (99) (3%) Employee Costs: Underspend of £0.098m due to vacancy management.
(1,405) (91) 6% Income: Recharge to HRA for CCTV and Out of Hours £0.091m.
(48) Other minor movements
(238)
Note 4 Other Housing
Movement: There has been no overall significant movement from P10.
4,340 (277) (6%)
Employee Costs: underspend of £0.277m due to vacancy management.  This underspend includes vacant
posts being held due to the Housing Service review, new employees taking up posts at the bottom of the pay
scale and a number of staff not part of the Local Government Pension Scheme.  £0.086m of the underspend
relates to the Rapid Rehousing Transition Plan (RRTP).
2,458 134 5%
Property Costs: overspend due to £0.105m in furnished tenancy grant costs, a review of the charging structure
is to be undertaken; £0.080m in property repairs and £0.020m additional costs in electricity.  This is partially
offset by £0.040m underspends in cleaning costs and £0.022m in void rent losses.
104 117 113% Other Expenditure: there is an overspend of £0.048m in arrears write offs and a forecasted additional bad debt
provision of £0.069m.
(20) Other minor movements
-
It is requested to earmark £0.118m of underspends that relate to the Rapid Rehousing Transition Plan to
enable the preparation of the service for the implementation of the Homelessness Prevention Duties aligned to
the New Housing Scotland Act 2014.
(46)
Note 5 Roads
Movement: There has been an adverse movement of £0.134m since P10, with £0.056m of this due to
increased Winter Maintenance costs. The remaining movement relates mainly to increased contractor costs,
which are partly offset with increased income and a decrease in supplies and services.
4,282 114 3% Third Party Payments: The overspend is primarily due to reactive repairs related to subsidence and drainage.
20 Other minor movements.
134
88

Page 89

Appendix 3a
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 6 Streetscene
Movement: There has been an adverse movement of £0.102m since period 10, which is mainly due to
decreased income. Interment income has decreased by £0.052m, memorial permit income by £0.014m and
income from other departments by £0.065m. This has been partly offset by a £0.018m decrease in employee
costs due to vacancy management and a £0.017m decrease in transport costs.
(2,899) 134 (5%)
Income: Under recovery of income relates mainly to interments £0.052m, memorial permits £0.019m and
income from other departments £0.065m, as there was less work carried out for other departments in the latter
part of the year than anticipated.
134
Note 7 Waste Services
Movement: There has been a favourable movement of £0.047m since P10, which is mainly employee costs.
5,763 653 11%
Employee Costs: The overspend includes temporary additional resources required to deal with new builds and
to cover a significant, and challenging, sickness absence rate. The statutory nature of the service requires
additional resources to cover unforeseen absences. A robust absence monitoring process is in place and an
overall review of the Waste service in light of legislative changes and current service demands is ongoing. This
will also take account of waste compositional analysis.
529 103 19% Supplies & Services: Overspend on Compactors £0.047m, Tools and Implements £0.057m and Trade effluent
£0.024m, offset by underspend in Materials £0.037m.
200 236 118%
Transport Costs: Additional vehicles were temporarily in place earlier in the year to deal with pressures from
new builds and seasonal demands in Garden Waste, however a reduction of 3 vehicles has been implemented
since 1st October 2023.
3,067 (362) (12%) Income: Additional income from the renewal of kerbside recyclate contracts of £0.326m and £0.034m from sale
of scrap.
(82) Minor Movements:  Underspends across numerous budgets including administration costs of £0.037m and
third party payments of £0.023m.
548
Note 8 Municipalisation Advertising
Movement: There has been no movement from P10.
(123) 102 (83%)
Income: An under recovery of £0.102m primarily due to lead in time delays in vehicle advertising and
unfavourable market conditions. However, the team continue to robustly progress this initiative with 7
companies now signed up and we are currently in negotiations with a further 10 companies.
102
Note 9 Economic Policy
Movement: There has been no significant movement since P10.
265 (72) (27%) Employee Costs: An underspend of £0.072m due to vacancy management and funding received for work
completed in house.
(13) Other minor movements.
(85)
Note 10 Regeneration
Movement: There has been a favourable movement of £0.131m since P10 due to an underspend of £0.058m
in employee costs due to staff vacancy and £0.065m underspend in third party payments due to delays in
projects.
1,218 (58) (5%) Employee Costs:  There is an underspend of £0.058m due to vacancy management.
906 (65) (7%) Third Party Payments: There is an underspend of £0.065m due to delays in projects.
(8) Other minor movements
It is requested to earmark £0.121m to support the delivery of projects currently underway, including an
allocation to the CWB post for the delivery of the Repurposing Property Grant Fund.
(131)
Note 11 Property Management and Investment
Movement:  There has been an adverse movement of £0.144m since P10 due to an under recovery in project
income.
2,791 (49) (2%) Employee Costs: Underspend in employee costs is due to vacancy management.
(962) 217 (23%) Income: There is an under-recovery of fee income of £0.217m which is primarily related to projects.
(3) Other minor movements
165
89

Page 90

Appendix 3a
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 12 Property Maintenance Costs
Movement: There has been favourable movement of £0.116m since P10 largely due to reduced statutory
compliance costs.
3,228 582 18%
Property costs: There is a £0.314m overspend related to unforeseen RAAC mitigation works (£0.159m) and
other essential reactive maintenance works. In addition, there is an overspend of £0.359m in statutory
compliance due to essential re-profiling of backlog electrical compliance work. This has been offset by a
£0.078m underspend in PMB projects due to reprioritisation to mitigate the above overspend position.
(8) Other minor movements
574
Note 13 Property Running Costs
Movement: There has been adverse movement of £0.118m since P10 largely due to service charges in
relation to community hubs and Brooksby.
7,106 200 3%
Property Costs: There is a £0.150m overspend due to service charges for community hubs within SHU's and a
£0.100m overspend in service charges in relation to other properties.  These overspends are partially offset by
a NDR refund of £0.079m for the revaluation of Auchenharvie Academy.                                                                                                                          
4 Other minor movements
204
Note 14 Energy and Sustainability
Movement: There has been no movement since P10.
7,828 82 1%
Property Costs: Due to the current energy crisis and after drawing down £2.524m from contingencies and
earmarked funds there is an overspend in property costs of £0.082m.
A number of workstreams are ongoing to reduce the above tariff related increases and as part of our overall
sustainability strategy.
(82) Other minor movements
-
Note 15 Internal Transport
Movement: There has been a favourable net movement of £0.080m since P10 due to decrease in fuel costs of
£0.052m; a decrease in repair & maintenance costs of £0.067m; increase in over-recovery in bus transport
Income of £0.076m offset against an increase in external hires of £0.056m and an increase in transport
provision of £0.046m.
1,976 (111) (6%) Employee Costs: There is an underspend of £0.111m due to vacancy management.
4,457 368 8% Transport Provision Costs: There is an overspend of £0.368m due to an increase in the number of pupils
requiring transport for 2023/24, along with increases in contract costs due to inflation.
1,721 (101) (6%) Fuel: There is an underspend in fuel of £0.101m due to lower than projected usage.
526 184 35%
External Hires: There is an overspend of £0.184m for the additional hire of vehicles. This is a due to a
combination of increased rental costs from suppliers, the prolonged lead delivery times for replacement
vehicles and the increase in downtime of fleet vehicles due to age and the availability of parts.
1,103 93 8%
Repairs & Maintenance: There is an overspend of £0.093m in repairs and maintenance as a result of price
increases and maximising the life of assets due to replacement vehicle lead times. This is also partially offset
with the underspend in employee costs due to vacancies and the need for additional external labour to support
ongoing fleet maintenance and repairs.
(3,097) (171) 6% Income: There is an over recovery of £0.219m in bus transport income and hire of pool vehicles which is
partially offset by an under-recovery of £0.058m in the pool car scheme.
(22) Other minor movements
240
90

Page 91

Appendix 4
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,257 2,234 (23)               (1%)
SPT Concessionary Fares 286 291 5                  2%
Ayrshire Joint Valuation Board 965 932 (33)               (3%)
3,508 3,457 (51)               (1%) 1           
Other Corporate Costs
Pension Costs 5,790 5,790 -                   0%
Central Telephones 160 160 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
4,600 (1,105)          (5,705)          (124%) 2           
Insurance Account (232)             (232)             -                   0%
Housing Benefits 3,197           2,821           (376)             (12%) 3           
17,023 10,891 (6,132)          (36%)
Less Proposed Carry Forwards 4,510 4,510          
Net Total 17,023 15,401 (1,622) (10%)
91

Page 92

Appendix 4a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Budget
£000
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
There has been no significant movement since Period 10
3,508 (51)                 -1% Underspend of £0.051m due confirmation of annual requisitions and applicable refunds.
(51)
Note 2 Other Corporate Items
There has been a favourable movement of £4.628m. This is primarily related to lower than anticipated
utilisation of centrally held inflationary provisions, £0.681m, including reduced requirements for Severance
costs, Bad Debt Provision and Vehicle Fuel Inflation; additional Scottish Government funding confirmed too
late for full utilisation in year, £2.913m, lower than anticipated costs in relation to severance costs outwith the
recent VER scheme, £0.740m, and increased income from recharges to other services, £0.294m.
4,600 (5,705)             -124%
The underspend is primarily related to centrally held inflationary cost provisions, which are being applied to
offset pressures reported across other services, £1.169m, additional income from employee benefit schemes
and recharges to other services of the Council, £0.513m, and additional Scottish Government grant income in
relation to a range of services, including  Ukrainian Resettlement, Employability and NDR reliefs, £3.256m. The
majority of the Scottish Government grant income was confirmed too late in the financial year for full utilisation
and is subject to a number of earmarking requests to enable these funds to be fully applied during 2024/25.
It is proposed to earmark funds totalling £4.510m as follows:
Additional workforce planning costs associated with the review of Early Learning and Childcare services,
£1.700m;
Provision for potential repayment of Housing Benefit income in relation to supported accommodation claims,
£0.500m;
Contribution to the Change and Service Redesign Fund, £0.399m;
Provision for initial start up costs in relation of the Foxgrove (National Secure Adolescent Inpatient Service)
unit, £0.250m;
Inflation provision in relation to the Arran Local Bus Services contract, £0.204m;
CCTV Review, £0.050m.
Carry forward of Scottish Government grant funding required in 2024/25:
£0.864m for Ukrainian resettlement;
£0.394m for Employability Staffing;
£0.049m for Summer Activities;
£0.039m for Islands Cost Crisis Emergency;
£0.036m for DWP Funding;
£0.015m for Educational Psychologist and
£0.010m for Firework control zones
(5,705)
Note 3 Housing Benefit
There has been a £0.276m favourable movement since Period 10 in relation to supported accommodation
housing benefit income.
3,197 (376)                -12%
Underspend of £0.376m due to the provision of Housing Benefits and overpayment recovery. This is primarily
in relation to additional backdated income arising from supported accommodation claims. As noted above, it is
requested that £0.500m is earmarked for potential payment of this income to the DWP upon completion of an
ongoing review.
(376)
92

Page 93

Appendix 5
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Objective Summary
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 22,192 22,192 - -
Contribution to Loans Fund Reserve 8,069 8,069 - -
Scottish Government Funding (356,579) (356,577) 2 (0%)
Council Tax (65,533) (65,518) 15 (0%)
Use of Earmarked Funds (20,867) (20,867) - -
Net Total (412,718) (412,701) 17 (0%)
Carried Forward Funds to 2024-25 £000
Grants / External Funding
Ukrainian Resettlement 864        
DWP Housing Benefit Review 500        
Employability Staffing 394        
Summer Activities 49          
Island Cost Crisis Emergency 39          
DWP funding not fully utilised 36          
Educational Psychologist 15          
Firework Control Zones 10          
1,907     
Other Commitments
Early Learning and Childcare Service Redesign 1,700     
Contribution to Change and Service Redesign Fund 399        
IT Software and Contract Pressures 354        
Foxgrove - start up costs 250        
Arran Bus Contract Pressures 204        
Planning Income Realignment 147        
CWB - delivery of the Repurposing Property Grant Fund 121        
Rapid Rehousing Transition Plan 118        
Elections Fund 102        
Occupational Health Contract Pressures 62          
CCTV Review 50          
Cost of School Day 30          
Community Grants 42          
3,579     
5,486     
93

Page 94

Appendix 6
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Annual
Budget
Actual
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,482 4,960 (522) (10%) 1
Property Costs
Responsive Repairs 7,293 7,013 (280) (4%)
Void Repairs 3,576 4,357 781 22%
Planned and Cyclical Maintenance 4,834 5,065 231 5%
Aids and Adaptions 1,667 1,613 (54) (3%)
Other property costs 5,472 5,592 120 2%
Total for Property Costs 22,842 23,640 798 3% 2
Supplies & Services 568 370 (198) (35%) 3
Transport Costs 28 15 (13) (46%)
Administration Costs 1,892 1,915 23 1%
Third Party Payments 3,519 3,366 (153) (4%) 4
Transfer Payments 172 156 (16) (9%)
Other Expenditure 380 661 281 74% 5
Capital Financing Costs 23,310 15,518 (7,792) (33%) 6
Gross Expenditure 58,193 50,601 (7,592) (13%)
Income
Council House Rents (56,803) (55,956) 847 (1%)
Other Rents (332) (392) (60) 18%
Recharges (828) (952) (124) 15%
Other Income (230) (182) 48 (21%)
Total Income (58,193) (57,482) 711 (1%) 7
Net Expenditure - (6,881) (6,881)
94

Page 95

Appendix 6a
HRA
BUDGETARY CONTROL 2023/24
REPORT FOR THE 12 MONTHS TO 31 MARCH 2024
Budget
£000
Variance
£000
Variance as
% of budget
Note 1
5,482 (522) -10%
(522)
Note 2
22,842 798 3%
798
Note 3
568 (198) -35%
(198)
Note 4
3,519 (153) -4%
(153)
Note 5
380 281 74%
281
Note 6
23,309 (7,791) -33%
(7,791)
Note 7
(58,193) 711 -1%
711
B/fwd from
2022/23
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/24
£m £m £m £m £m £m
4.709 - - 6.881 - 11.590
5.000 - - - - 5.000
0.123 - - - - 0.123
0.636 (0.336) - - - 0.300
- 2.000 - - - 2.000
0.781 0.772 - - - 1.553
1.500 (1.500) - - - -
0.198 (0.198) - - - -
0.416 (0.416) - - - -
0.052 (0.052) - - - -
0.270 (0.270) - - - -
13.685 - - 6.881 - 20.566
HRA reserves form part of the overall funding to support the 30 year HRA business plan and will be drawndown in line with specific programmes
Other Expenditure
Movement - there has been an adverse movement of £0.281m due to an increase in the bad debt provision
An overspend of £0.281m due to an increase in the bad debt provision.
HRA reserves and balances
Capital Financing Costs
An underspend in capital financing costs of £7.791m due to lower than anticipated loan charges.  This is due to the
profiling within the HRA Capital budget and the continued under borrowed position as the council utilises internal
funds in line with the Treasury Management and Investment Strategy. The underspend will be reflected in the
Business Plan.
Movement - there has been a favourable movement of £0.732m since P10. 
Property Costs
Movement - there has been a favourable movement of £0.641m since Period 10. This is due to a favourable
movement of £0.089m in Responsive Repairs, £0.165m in Planned and Cyclical Maintenance, £0.054m in Aids &
Adaptations and £0.370m in other property costs, partially offset by an adverse movement of £0.038m in Void
Repairs.
An overspend of £0.798m in Property Costs. This is due to an overspend of £0.781m in Void Repairs,  £0.231m in
Planned and Cyclical Maintenance and £0.120m in other property costs, partially offset by an underspend of
£0.280m in Responsive Repairs and £0.054m in Aids and Adaptations.
Income
Movement - there has been an adverse movement of £0.667m since Period 10. This is mainly due to a reduction in
Council House Rents of £0.426m, £0.080m in Recharges and £0.153m in Other Income.
An under recovery in income of £0.711m. This is due to an under recovery in Rental income of £0.846m, as a result
of protracted and Long term voids, and £0.048m in Other Income, partially offset by an over recovery of £0.060m
other rents and £0.124m in Recharges.
Third Party Payments
Movement - there has been an adverse movement of £0.023m since Period 10.
An underspend of £0.153m in third party payments primarily due to a reduction in the ASB contribution.
Supplies and Services
Movement - there has been an favourable movement of £0.218m since Period 10. This is mainly due to a reduction
of £0.104m in software licences and £0.067m in computer equipment.
An underspend of £0.198m in supplies and services primarily due to an underspend of £0.104m in software licences
and £0.067m in computer equipment.
Section
Employee costs
An underspend in employee costs of £0.522m. This is due to vacancy management.
Movement - there has been a favourable movement of £0.059m since Period 10 due to vacancy management.
Council House Building Fund
Welfare Reform
Contingency Balance
Infrastructure Improvements
Major Refurbishment Works
Tenant led balance
Electrical Testing
Sustainability Fund
Software Licences
Voids - non programmed works
Housing Services Transformation Prog.
95

Page 96

Appendix 7
1) Budget Virements
Place
Regeneration - Third Party Payments T -0.202
Regeneration - Grant Income T 0.202
Roads - Third Party Payments T 1.096
Roads - Supplies and Services T -0.049
Roads - Employee Costs T -0.033
Roads - Income T -1.014
Employability - Third Party Payments T 0.189
Employability - Transport Costs T 0.005
Employability - Employee Costs T -0.072
Employability - Supplies and Services T -0.021
Employability - Admin Costs T -0.001
Employability - Income T -0.100
Ayrshire Growth Deal - Employee Costs T 0.248
Ayrshire Growth Deal - Supplies & Services T 0.009
Ayrshire Growth Deal - Third Party Payments T 0.982
Ayrshire Growth Deal - Grant Income T -1.239 0.000
Communities
Information and Culture - Third Party Payments T 0.023
Information and Culture - Supplies and Services T -0.002
Information and Culture - Income T -0.021
Community Mental Health - Employee Costs T 0.082
Community Mental Health - Third Party Payments T 0.028
Community Mental Health - Grant Income T -0.110
ASN Placement Fees - Employee Costs T 0.391
ASN Placement Fees - Income T -0.391 0.000
0.000
Budget Management - 31 March 2024
Virement/Budget Adjustment Requests
2023/24
Perm (P) /
Temp(T)
Virement
£m
Directorate
Total
£m
96

Page 97

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet 
Title:    Capital Programme Performance to 31 March 2024 
Purpose:  To advise Cabinet of progress in delivering the Capital
Investment Programme for 2023/24. 
Recommendation:  That Cabinet agrees to (a) note the revisions to budgets
outlined in the report; and (b) note the General Services and
HRA expenditure to 31 March 2024. 
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2023/24 to 2030/31 was
approved by Council on 1 March 2023. The Housing Revenue Account (HRA) Capital
Investment Programme 2023/24 sits within the updated HRA Business Plan and was
approved by Council on 15 February 2023. 
1.2  This is the final monitoring report for the year which identifies the current programme
for 2023/24, taking account of adjustments made to the initial budgets and advises of
the actual expenditure to 31 March 2024. 
1.3   The final outturn report for the General Fund reports a net breakeven position against
a revised budget of £85.250m. The final outturn position for the HRA is an
underspend of (£2.897m) against a revised budget of £41.863m. 
1.4  Within the General Fund, adjustments to funding have resulted in net reductions to the
overall capital programme of (£2.503m). These are primarily related to accounting
adjustments to transfer funding to the General Fund Revenue budget. 
1.5 Reviews of individual project plans have identified a number of adjustments to the
current profiles. As a result, (£8.232m) has been reprofiled for delivery in 2024/25 and
beyond. This has been offset by the acceleration of £9.219m to 2023/24 from future
years. 
1.6 Within the HRA, additional government grants of £1.927m have been received in
relation to the Council house buy-back programme to accommodate Ukrainian
Displaced People. This has been supported by additional prudential borrowing. A
review of delivery timescales has identified a requirement to re-profile (£1.377m) of
works for delivery in 2024/25 and beyond. This has been offset by the acceleration of
£3.409m to 2023/24 from future years. 
Agenda Item 9
97

Page 98

1.7 Major risks to the forecast position continue to arise from ongoing cost volatility and
the uncertainty around potential future changes to local authority capital accounting
arrangements. In terms of cost volatility, individual project costs will continue to be
monitored closely with cost increases met initially from the additional flexibility built
into the programme. Any costs in excess of the current level of flexibility provision will
require to be funded from within existing resources. 
2. Background 
General Fund 
2.1 The following table outlines the movements in the 2023/24 General Services budget: 
2.2 (a) Changes to Funding 
The capital programme has been updated to reflect the following changes to funding.
Downturned funding is primarily related to changes in the scope of works or delays in
third party agreements or other information agreed with the funding body: 
2023/24
£m
Budget as at 31 January 2024 86.766      
a) Changes to Funding (0.198)      
b) Other Revisions to the Programme (2.305)      
Revised Budget 84.263      
c) Alterations to phasing of projects:-
2023/24 to 2024/25 (8.232)           
2024/25 to 2023/24 9.219        
Budget as at 31 March 2024 85.250      
Funding Body Amount Project
Developer Contribution £0.148m Panel reinstatement works
Developer Contribution £0.106m Roads remediation works
Scottish Government £0.043m Road Safety Improvement Fund
SPT £0.014m Bus Corridor Improvements
SPT Downturned (£0.001m) Brodick to Corrie Cycle Paths
SPT Downturned (£0.002m) Irvine Friendly Cycle Town
SPT Downturned (£0.007m) Cumbrae Ferry & Bus Stop
SPT Downturned (£0.013m) B714 Active Travel
SUSTRANS £0.062m B777 Corridor Improvements
SUSTRANS £0.002m Access Paths
SUSTRANS Downturned (£0.001m) Saltcoats Old Cal Railway Ph2
SUSTRANS Downturned (£0.002m) Kilbirnie to Kilwinning
SUSTRANS Downturned (£0.003m) Saltcoats Old Cal Railway Ph1
98

Page 99

2.3 (b) Other Revisions to the Programme 
Further additions to the programme of £0.181m have been identified in relation to
Capital Funded from Current Revenue (CFCR) transfers across a range of projects.
This has been offset by the identification of a number of projects totalling (£2.486m)
which, although managed as part of the Capital Programme, have been transferred
for inclusion in the year end Revenue Monitoring report in line with accounting
requirements. In addition, £0.500m has been applied from the Flexibility Fund to
address contractor cost inflation in relation to Millport Townhall. This has been
subsequently rephased into future years. 
Funding Body Amount Project
SUSTRANS Downturned (£0.016m) B777 Corridor Improvements
SUSTRANS Downturned (£0.019m) NCN73 Accessibility
SUSTRANS Downturned (£0.047m) NCN753 Largs Promenade
SUSTRANS Downturned (£0.154m) Links to Eglinton Park
SUSTRANS Downturned (£0.308m) Fairlie Coastal Path
Total (£0.198m)
Funding Source Amount Project
Transfers to Revenue (£0.687m) Improvement Grants
Transfers to Revenue (£0.020m) Workplace Chargers
Transfers to Revenue (£0.216m) VDLF
Transfers to Revenue (£0.223m) UK Shared Prosperity Fund
Transfers to Revenue (£0.002m) CWSR
Transfers to Revenue (£0.007m) Town Centre Regeneration
Transfers to Revenue (£0.017m) Island Cost Crisis Emergency Fund
Transfers to Revenue (£0.071m) Island Infrastructure Fund
Transfers to Revenue (£0.097m) Garrison House
Transfers to Revenue (£0.149m) Millport Town Hall Ph2
Transfers to Revenue (£0.221m) Millport Town Hall Regeneration
Transfers to Revenue (£0.221m) Dyemill Bike Park
Transfers to Revenue (£0.555m) PBIP
CFCR (£0.083m) Spend doesn’t meet Capital Definition
CFCR £0.049m Street Furniture
CFCR £0.043m AGD Great Harbour
CFCR £0.082m 2-4 Boyle Street Hostel
CFCR £0.036m Early Years
CFCR £0.022m AGD Marine Tourism Arran
CFCR £0.022m AGD Marine Tourism Cumbrae
CFCR £0.010m Coastal Play Parks
Utilisation of Flexibility £0.500m Millport Townhall Phase 2
Utilisation of Flexibility (£0.500m) Flexibility Fund
Total (£2.305m)
99

Page 100

2.4 (c) Alterations to the Phasing of Projects 
A further review of individual project plans, taking cognisance of the current levels of
volatility within the construction sector, has identified a requirement to re-profile
(£8.232m) of works for delivery in 2024/25 and beyond. This includes the reversal of
the in-year corporate phasing adjustment which reflected the level of optimism bias
included in the expenditure forecasts: 
Service Amount Project
Communities (£0.683m) Moorpark Primary
(£0.553m) Ardrossan New Build
(£0.068m) Abbey Tower
(£0.049m) UFSM
(£0.071m) Other minor adjustments
(£1.424m)
Chief Executives (£0.027m) ICT Investment Fund / LAN / Wifi
(£0.027m)
HSCP (£0.268m) Carefirst
(£0.030m) 47 West Road
(£0.298m)
Place (£9.174m) Ardrossan north Shore
(£0.711m) Largs Prom Seawall
(£0.633m) Garrison House
(£0.578m) Ardrossan Promenade
(£0.784m) Millport Town Hall PH2
(£0.276m) Vehicles
(£0.200m) Nature Restoration Fund
(£0.177m) AGD Projects
(£0.151m) PBIP
(£0.149m) Panel reinstatement works
(£0.106m) Roads remediation works
(£0.106m) Parking Charges & DPE
(£0.091m) Emergency Control Centre
(£0.078m) UK SPF
(£0.077m) Solar PV Retrofit
(£0.064m) Non Domestic Energy Efficiency
(£0.059m) Community Bus Fund
(£0.427m) Other minor adjustments
(£13.841m)
Other (£1.293m) Flexibility Fund
(£0.351m) Core Infrastructure
(£1.644m)
Corporate £9.002m Uncertainty / Sensitivity Adjustment
£9.002m
Total (£8.232m)
100

Page 101

These adjustments have been partly offset by the acceleration of £9.219m of
expenditure to 2023/24 from future years. 
2.5 These adjustments have resulted in a revised 2023/24 budget at 31 March 2024 of
£85.250m.  
Service Amount Project
HSCP £0.048m Community Alarms
£0.033m Other minor adjustments
£0.081m
Place £2.591m Millport Coastal FPS
£0.759m AGD I3 DPMC Ph2
£0.172m Roads Improvement
£0.156m B714 Upgrade
£0.118m Solar PV Nethermains
£0.077m Upper Garnock FPS
£0.075m Marress House
£0.074m Solar PV Shewalton
£0.164m Other minor adjustments
£4.186m
Communities £4.931m Montgomerie Park School
£0.021m Other minor adjustments
£4.952m
Total £9.219m
101

Page 102

2.6 The following graph illustrates the movement in each programme on a service basis
compared to the revised programme: 
2.7  The impact on budgeted funding, elements of which are related to the profile of
expenditure reported above, is a reduction of (£1.516m) from the revised budget,
including: 
18.349 0.799 0.757 93.126 2.900 115.931
21.681 0.892 2.265 107.802 (25.388) 107.252
22.099 0.771 2.265 102.971 (22.274) 105.832
18.466 4.711 2.460 84.085 (12.643) 97.079
18.205 0.505 1.834 72.912 (6.690) 86.766
21.654 0.480 0.930 62.186 - 85.250
3.305 (0.319) 0.173 (30.940) (2.900) (30.681)
Approved Programme
Movement
Programme @ P5
Programme @ P3
Programme @ P10
Programme @ P8
Programme @ P12
Category Amount Comments
Borrowing £2.178m Rephased aligned to projected expenditure
CFCR £0.181m Additional CFCR Contributions
Capital Grants (£2.713m) Rephased and revised government grants
Other Grants (£1.162m) Rephased and revised contributions
Total (£1.516m)
102

Page 103

2.8 Capital Expenditure to 31 March 2024 
The actual expenditure by service is summarised in the following table:   
Information on the progress of all projects can be found in Appendix 1. 
2.9 Although not formally reflected in the financial performance reports at this time due to
ongoing uncertainty, areas of cost risk have been identified across a number of
projects. These risks are linked to a number of factors, including cost volatility linked
to inflationary pressures; limited availability of contractors, supply chain issues and
material shortages which are impacting on tender returns and the cost of materials;
delays resulting from interaction with external agencies and regulators; and other
contract management issues across a number of projects. Specific projects where
cost risks have been identified, or are anticipated, include Moorpark Primary,
Montgomerie Park Primary, Ardrossan Campus, Upper Garnock Flood Prevention
Scheme, Millport Coastal Flood Prevention Scheme, Largs Sea Wall, Ardrossan North
Shore and Ardrossan Harbour Interchange. While some mitigation has been built into
the Capital Programme in the form of flexibility budgets, totalling £10m over the next
few years, cost pressures may exceed this provision. These risks will be quantified as
individual projects are completed and tendering exercises are finalised, with the
impact on the costs of the programme being monitored and reported to Cabinet as
appropriate. It is recognised, however, that any costs in excess of the current level of
flexibility provision will require to be funded from within existing resources. 
Revised
Budget
2023/24
Budget
Revisions
Carry
Forwards
and
Adjustments
Revised
Budget
2023/24
Expenditure
/ Income to
31 March
2024
Variance
Over /
(Under)
£m £m £m £m £m £m
Expenditure
Communities 18.205 (0.078) 3.527 21.654 21.654 -
Chief Executive 0.505 0.001 (0.026) 0.480 0.480 -
Health and Social Care Partnership 1.834 (0.687) (0.217) 0.930 0.930 -
Place 72.912 (1.071) (9.655) 62.186 62.186 -
Other including Flexibility (6.690) (0.668) 7.358 - - -
Total Expenditure 86.766 (2.503) 0.987 85.250 85.250 -
Income
General Capital Grant (38.482) - - (38.482) (38.482) -
Specific Capital Grant (11.529) 1.736 1.592 (8.201) (8.201) -
Capital Funded from Current Revenue (1.405) (0.181) - (1.586) (1.586) -
Capital Receipts (0.537) - 0.249 (0.288) (0.288) -
Other Grants & Contributions (3.316) 0.948 (0.475) (2.843) (2.843) -
Prudential Borrowing (31.497) - (2.353) (33.850) (33.850) -
Total Income (86.766) 2.503 (0.987) (85.250) (85.250) -
103

Page 104

Housing Revenue Account 
2.10 The following table outlines the movements in the 2023/24 HRA Capital budget: 
2.12  (a) Changes to Funding 
The HRA capital programme has been updated to include the Council house buy-back
programme to accommodate Ukrainian Displaced People, as approved by Cabinet on
7 November 2023. This is funded by additional Scottish Government grant of
£1.927m, with the balance of funding supported by prudential borrowing. 
2.13 (b) Alterations to the Phasing of Projects 
A further review of the timescale for delivery of capital projects has identified a
requirement to re-profile (£1.377m) of works for delivery in 204/25 and beyond,
including: 
2023/24
£m
Budget as at 31 January 2024 37.372       
a) Changes to Funding 2.459         
b) Alterations to phasing of projects:-
2023/24 to 2024/25 (1.377)             
2024/25 to 2023/24 3.409         
Budget as at 31 March 2024 41.863       
Category Amount Project
New Builds (£0.155m) Kings Arms
(£0.078m) Contingency
(£0.159m) Other minor adjustments
(£0.392m)
Improvements (£0.467m) Saltcoats MSF Investment
(£0.183m) EWI
(£0.135m) Wallfloor Rendering
(£0.055m) Roofing
(£0.840m)
Other (£0.145m) Estate Based Regeneration
(£0.145m)
Total (£1.377m)
104

Page 105

This has been offset by the acceleration of £3.409m of project expenditure for delivery
during 2023/24, including: 
2.14 These adjustments have resulted in a revised 2023/24 budget at 31 March 2024 of
£41.863m. 
2.15 The impact on budgeted funding, elements of which are related to the profile of
expenditure reported above, is an increase of £4.491m: 
Category Amount Project
New Builds £1.796m St Marys Primary
£0.792m Laburnum Avenue
£0.102m James Reid Site
£0.050m Corsehillhead
£0.151m Other minor adjustments
£2.891m
Improvements £0.173m Solar Panels
£0.080m Other minor adjustments
£0.253m
Other £0.265m Sheltered Housing Units
£0.265m
Total £3.409m
Category Amount Comments
Sale of Assets (£0.004m) Additional receipts received
CFCR (£0.040m) Additional CFCR Contributions
Borrowing (£9.214m) Rephased aligned to projected expenditure
Use of Reserves £5.404m Rephased aligned to projected expenditure
Capital Grants (£0.637m) Rephased aligned to projected expenditure
Total (£4.491m)
105

Page 106

2.16  Capital Expenditure to 31 March 2024 
The actual expenditure is summarised in the following table:   
Further information on the progress of all projects can be found in Appendix 2 
2.17 A variance of (£2.897m) is reported within the HRA capital programme for 2023/24
arising from revisions to a number of projects, including: 
Revised
Budget
2023/24
Carry
Forwards
and
Adjustments
Revised
Budget
2023/24
Actual
Expenditure /
Income to 31
March 2024
Variance
Over /
(Under)
Service £m £m £m £m £m
Expenditure
Housing Revenue Account 37.372 4.491 41.863 38.966 (2.897)
Total Expenditure 37.372 4.491 41.863 38.966 (2.897)
Income
Sale of Assets - (0.004) (0.004) (0.004) -
CFCR (5.151) (0.040) (5.191) (5.191) -
Capital Grants (6.786) (0.637) (7.423) (7.423) -
Use of Reserves (4.065) 4.065 - - -
Affordable Housing Contribution (2.445) 1.339 (1.106) (1.106) -
Prudential Borrowing (18.925) (9.214) (28.139) (25.242) 2.897
Total Income (37.372) (4.491) (41.863) (38.966) 2.897
Project Variance Comments
High Flats Demolition (£0.730m) Project Complete
Heating (£0.539m) Scope of works reduced
Harbourside (£0.374m) Project Complete
Wet Rooms & Bathrooms (£0.355m) Scope of works reduced
Internal Management charges (£0.318m) Project Complete
Flatt Road (£0.228m) Project Complete
Health and Safety Works (£0.207m) Budget no longer required
Kitchen Voids (£0.136m) Scope of works reduced
Friars Lawn (£0.115m) Project Complete
Afton Court (£0.086m) Project Complete
St Colms Largs (£0.078m) Project Complete
Caley Court (£0.037m) Project Complete
Garrier Court (£0.034m) Project Complete
Other minor variances (£0.012m) Project Complete
Brathwic Terrace £0.129m Project Complete
Acquisition of Houses £0.223m Project Complete
Total (£2.897m)
106

Page 107

2.18 Further cost pressures resulting from inflationary and supply chain issues continue to
be monitored and a review of the potential impact on the Business Plan and Capital
Programme will be undertaken to address any identified issues. 
3. Proposals 
3.1 That Cabinet agrees to (a) note the revisions to budgets outlined in the report; (b) note
the General Services and HRA expenditure to 31 March 2024. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Expenditure will continue to be
closely monitored to ensure early action is taken regarding any projected
underspends or overspends. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by focusing our
investment on priorities, managing risk and supporting delivery of key priorities. 
Community Wealth Building 
4.7 None. 
107

Page 108

5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Capital Programme Performance to 31 January 2024 – Cabinet, 19 March 2024 
108

Page 109

TOTAL PROJECT
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Brought / Carry
Forward to 2024/25
Total Revised
Budget 2023/24
Actual Expenditure to
31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend
£ £ £ £ £ £ £ £ £ £
EXPENDITURE
Communities
Nursery Education 16,459,468 16,236,378 16,459,468 0 437,003 (0) 437,003 437,003 0 0
Primary Schools 50,154,297 27,470,725 50,154,297 0 19,303,072 (0) 19,303,072 19,303,072 0 0
Secondary Schools 81,629,839 5,111,862 81,629,839 0 1,195,186 0 1,195,186 1,195,186 0 0
Special Education 25,345,985 25,246,058 25,345,985 0 41,016 (0) 41,016 41,016 0 0
Schools Other 932,123 829,103 932,123 0 677,646 0 677,646 677,646 0 0
Information & Culture 6,563 6,563 6,563 0 0 0 0 0 0 0
Completed Projects 43,415,700 43,415,700 43,415,700 0 0 0 0 0 0 0
SUB TOTAL 217,943,975 118,316,388 217,943,975 0 21,653,923 0 21,653,923 21,653,923 0 0
Chief Executive
Council IT Strategy 8,771,296 2,963,746 8,771,296 0 480,011 0 480,011 480,011 0 0
SUB TOTAL 8,771,296 2,963,746 8,771,296 0 480,011 0 480,011 480,011 0 0
Health & Social Care
Management & Support 1,581,814 1,189,674 1,581,814 0 917,491 (0) 917,491 917,491 0 0
Housing Non HRA 0 0 0 0 0 0 0 0 0 0
Adults 4,611,528 4,594,773 4,611,528 0 4,742 (0) 4,742 4,742 0 0
Young People 5,579,718 5,224,534 5,579,718 0 7,993 (0) 7,993 7,993 0 0
SUB TOTAL 11,773,060 11,008,980 11,773,060 0 930,226 (1) 930,225 930,225 0 0
Place
Roads 115,648,396 62,802,145 115,648,396 0 41,672,458 (0) 41,672,458 41,672,458 0 0
Streetscene 8,402,126 5,058,321 8,402,126 0 1,378,181 1 1,378,182 1,378,182 0 0
Transport 9,915,791 3,455,627 9,915,791 0 3,192,638 0 3,192,638 3,192,638 0 0
Waste Services 13,321,491 13,272,542 13,321,491 0 0 0 0 0 0 0
Renewable Energy 14,512,381 2,430,687 14,512,381 0 1,208,470 0 1,208,470 1,208,470 0 0
Office Accommodation 2,437,417 1,562,521 2,437,417 0 1,562,521 (0) 1,562,521 1,562,521 0 0
Other Property 1,581,355 826,429 1,581,355 0 329,540 (0) 329,540 329,540 0 0
Other Housing 581,905 231,905 581,905 0 142,930 0 142,930 142,930 0 0
Economic Development & Regeneration 164,088,693 37,894,863 164,088,693 0 12,688,015 0 12,688,015 12,688,015 0 0
Completed Projects 6,355,261 6,325,885 6,355,261 0 11,219 0 11,219 11,219 0 0
SUB TOTAL 336,844,817 133,860,925 336,844,817 0 62,185,972 0 62,185,972 62,185,972 0 0
Other
Other 13,777,000 0 13,777,000 0 0 0 0 0 0 0
SUB TOTAL 13,777,000 0 13,777,000 0 0 0 0 0 0 0
Total Project Expenditure 589,110,147 266,150,039 589,110,147 0 85,250,132 0 85,250,132 85,250,132 0 0
Total Project Income (85,250,132) (0) (85,250,132) (85,250,132) 0 0
Total Net Expenditure 0 0 0 0 0 0
On Target (+0.5% of budget)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less)
On Target (up to  5% delay of original timescales)
Slightly off target  (+ 5% to 10% of original timescales)
Significantly off target (+10% or more of original timescales)
The following classifications have been used to highlight financial performance against
budget
CURRENT YEAR 2023/24
North Ayrshire Council Capital Statement 2023/24
Year Ended 31st March 2024
Period 12
The following classifications have been used to highlight delivery performance
against original timescales set
109

Page 110

Revised Budget
23/24 Variance
£ £ £ £ £ £ £ £
CAPITAL BORROWING
Prudential Borrowing 68,291,931 5,814,577 2,683,086 76,789,594 (42,897,565) (42,461) 33,849,568 33,849,567 (2)
SUB TOTAL 68,291,931 5,814,577 2,683,086 76,789,594 (42,897,565) (42,461) 33,849,568 33,849,567 (2)
SCOTTISH GOVERNMENT FUNDING
Specific Capital Grants
Early Learning & Childcare 0 26,594 59,206 85,800 1 85,801 85,801 (0)
Cycling / Walking /Safer Streets 1,159,954 (117,150) 271,000 1,313,804 28,522 1,342,326 1,342,326 (0)
Vacant & Derelict Land Funding 3,857,216 403,874 198,048 4,459,138 (2,182,969) 2,276,169 2,276,169 0
UK Government Grant - AGD 3,653,000 (98,741) 3,554,259 (1,359,416) 2,194,843 2,194,843 0
Town Centre Regeneration 0 65,691 140,000 205,691 (6,746) 198,945 198,945 0
Annickbank - Vacant & Derelict Land Investment Programme 400,000 400,000 0 400,000 400,000 0
Millport Town Hall Regeneration 0 (31,995) 252,529 220,534 (220,534) 0 0 0
Millport Town Hall Phase 2 94,022 339,498 433,520 (433,520) 0 0 0
Ardrossan Promenade 788,000 788,000 (578,499) 209,501 209,501 0
Islands Pit Stops 20,000 520,000 540,000 (540,000) 0 0 0
Islands Cost Crisis Emergency Fund 17,000 17,000 (17,000) 0 0 0
Place Based Investment Programme 0 622,801 948,836 1,571,637 (1,070,683) 500,954 500,954 (0)
UK Shared Prosperity Fund 98,414 98,414 (98,414) 0 0 0
Island Infrastructure Fund 0 140,373 140,373 (140,373) 0 0 0
B714 Improvements 500,000 322,741 822,741 428,054 1,250,795 1,250,795 0
Road Safety Improvement Fund 258,431 258,431 258,431 0
Ayrshire 5GIR 19,935 19,935 19,935 (1)
Renewal of Play Parks 231,000 231,000 (231,000) 0 0 0
2-4 Boyle Street Hostel 31,025 31,025 0 31,025 31,025 0
CO2 Monitors in Schools 0 0 43,523 43,523 43,523 (0)
Capital Grants
Flooding 20,525,000 20,525,000 0 20,525,000 0 0
General Capital Grant 15,179,000 15,179,000 2,167,204 17,346,204 37,871,204 0
SUB TOTAL 45,105,170 1,896,235 3,615,531 50,616,936 (3,933,484) 0 46,683,452 46,683,453 1
OTHER INCOME TO PROGRAMME
Use of Funds :-
Capital Fund 0 0 0 0 0 0 0 0 0
CFCR 0 0 0 0 1,584,912 0 1,584,912 1,584,912 0
Grants & Contributions 2,068,411 632,323 301,603 3,002,337 (158,983) 0 2,843,354 2,843,354 (0)
Capital Receipts 465,555 0 0 465,555 (220,134) 43,425 288,846 288,846 0
SUB TOTAL 2,533,966 632,323 301,603 3,467,892 1,205,795 43,425 4,717,112 4,717,112 0
TOTAL CAPITAL PROGRAMME FUNDING 115,931,067 8,343,135 6,600,220 130,874,422 (45,625,254) 964 85,250,132 85,250,132 (0)
23/24 Budget at
Capital Refresh Mar
2023
Capital Programme Funding 2023/24
Approved budget
at Period 1 used
as revised starting
point 2023/24
Actual Income to
31st March 2024Funding Description
Carry Forward
from 2022/23
Changes after
Capital Refresh Mar
2023
Total Changes in
Year
Changes at Capital
Refresh Mar 2024
110

Page 111

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual Expenditure
to 31st March 2024
Actual Over/ (Under)
Spend for 2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £
Nursery Education
Early Years Programme
EARLY LEARNING & CHILDCARE FUTURE PROJECTS 4,073 4,073 4,073 0 0 0 0 0 Complete Complete Complete Complete Complete
ST BRIDGETS EARLY YEARS 787,477 787,477 787,477 0 0 0 0 0 Complete Complete Complete Complete Complete
KILMORY EARLY YEARS 72,418 72,418 72,418 0 44,231 44,231 0 0 Complete Complete Complete Complete Complete
ST PETERS EARLY YEARS 1,273,594 1,273,594 1,273,594 0 29,867 29,867 (0) (0) Complete Complete Complete Complete Complete
ST JOHN OGILVIE EARLY YEARS 177,415 177,415 177,415 0 0 0 0 0 Complete Complete Complete Complete Complete
MAYFIELD PS EARLY YEARS 215,710 215,710 215,710 0 0 0 0 0 Complete Complete Complete Complete Complete
BEITH PS EARLY YEARS 341,180 341,180 341,180 0 1,417 1,417 (0) (0) Complete Complete Complete Complete Complete
SKELMORLIE PS EARLY YEARS 358,835 358,835 358,835 0 0 0 0 0 Complete Complete Complete Complete Complete
WEST KILBRIDE EARLY EARLY YEARS 227,912 227,913 227,912 0 2,857 2,857 0 0 Complete Complete Complete Complete Complete
GATESIDE EARLY YEARS 407,764 407,764 407,764 0 0 0 0 0 Complete Complete Complete Complete Complete
GARNOCK CAMPUS EARLY YEARS 58,755 58,755 58,755 0 0 0 0 0 Complete Complete Complete Complete Complete
FAIRLIE EARLY YEARS 208,220 208,220 208,220 0 3,100 3,100 0 0 Complete Complete Complete Complete Complete
ELDERBANK EARLY YEARS 22,983 22,983 22,983 0 0 0 0 0 Complete Complete Complete Complete Complete
DREGHORN EARLY YEARS 82,940 82,940 82,940 0 0 0 0 0 Complete Complete Complete Complete Complete
CUMBRAE EARLY YEARS 41,339 41,339 41,339 0 1,155 1,155 0 0 Complete Complete Complete Complete Complete
LARGS CAMPUS EARLY YEARS 45,836 45,836 45,836 0 0 0 0 0 Complete Complete Complete Complete Complete
MOORPARK EARLY YEARS 182 182 182 0 0 0 0 0 Complete Complete Complete Complete Complete
PIRNMILL EARLY YEARS 79,223 79,223 79,223 0 7,377 7,377 (0) (0) Complete Complete Complete Complete Complete
SHISKINE EARLY YEARS 139,088 139,088 139,088 0 12,075 12,075 (0) (0) Complete Complete Complete Complete Complete
CORRIE EARLY YEARS 29,337 29,337 29,337 0 895 895 (0) (0) Complete Complete Complete Complete Complete
LAMLASH EARLY YEARS 10,104 10,104 10,104 0 9,227 9,227 0 0 Complete Complete Complete Complete Complete
BRODICK EARLY YEARS 364,721 364,721 364,721 0 10,062 10,062 (0) (0) Complete Complete Complete Complete Complete
MARRESS HOUSE 4,085,347 3,862,258 4,085,347 0 301,947 301,948 1 1 22-Jul-22 30-May-24 Construction On Target Significantly off target Contractor Delays
Completed Nursery Education
GLENCAIRN / LOUDON MONTGOMERY EARLY YEARS 170,429 170,429 170,429 0 0 0 0 0 Complete Complete Complete Complete Complete
ARDEER EARLY YEARS 216,819 216,819 216,819 0 0 0 0 0 Complete Complete Complete Complete Complete
ST JOHNS EARLY YEARS 283,930 283,930 283,930 0 0 0 0 0 Complete Complete Complete Complete Complete
STANLEY EARLY YEARS 27,514 27,514 27,514 0 0 0 0 0 Complete Complete Complete Complete Complete
KILWINNING (PENNYBURN SCHOOL) EARLY YEARS 648,135 648,135 648,135 0 0 0 0 0 Complete Complete Complete Complete Complete
DALRY EARLY YEARS CENTRE 56,920 56,920 56,920 0 0 0 0 0 Complete Complete Complete Complete Complete
SPRINGVALE EARLY YEARS 104,557 104,557 104,557 0 0 0 0 0 Complete Complete Complete Complete Complete
ABBEY / ST LUKES PRIMARY SCHOOL EARLY YEARS 64,615 64,615 64,615 0 0 0 0 0 Complete Complete Complete Complete Complete
ST LUKES EARLY YEARS 1,966 1,966 1,966 0 0 0 0 0 Complete Complete Complete Complete Complete
CASTLEPARK EARLY YEARS 219,376 219,376 219,376 0 0 0 0 0 Complete Complete Complete Complete Complete
LAWTHORN EARLY YEARS 201,037 201,037 201,037 0 0 0 0 0 Complete Complete Complete Complete Complete
HAYOCKS EARLY YEARS 246,765 246,765 246,765 0 0 0 0 0 Complete Complete Complete Complete Complete
WOODLANDS EARLY YEARS 181,546 181,546 181,546 0 0 0 0 0 Complete Complete Complete Complete Complete
CORSEHILL EARLY YEARS 536,144 536,144 536,144 0 0 0 0 0 Complete Complete Complete Complete Complete
CALEDONIA EARLY YEARS 255,432 255,432 255,432 0 0 0 0 0 Complete Complete Complete Complete Complete
BLACKLANDS EARLY YEARS 204,144 204,144 204,144 0 0 0 0 0 Complete Complete Complete Complete Complete
WINTON EARLY YEARS 5,290 5,290 5,290 0 0 0 0 0 Complete Complete Complete Complete Complete
SPRINGSIDE EARLY YEARS 566,752 566,752 566,752 0 0 0 0 0 Complete Complete Complete Complete Complete
ST MARKS EARLY YEARS 350,497 350,497 350,497 0 0 0 0 0 Complete Complete Complete Complete Complete
Other Nursery Education
ANNICK PRIMARY EXT - EARLY YRS PROVISION 3,083,147 3,083,147 3,083,147 0 12,793 12,793 0 0 Complete Complete Complete Complete Complete
Total Nursery Education 16,459,468 16,236,378 16,459,468 0 437,003 437,003 (0) 0 (0)
Primary Schools
MOORPARK PRIMARY 11,466,001 11,466,001 11,466,001 0 4,929,452 4,929,452 (0) (0) 31-Jan-24 31-Jan-24 Construction On Target Slightly off target  Further information on the delivery
status is awaited from the contractor
CAPITAL MONITORING 2023/24
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2023/24 BUDGETS
111

Page 112

COMMUNITIES
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual Expenditure
to 31st March 2024
Actual Over/ (Under)
Spend for 2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
CAPITAL MONITORING 2023/24
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2023/24 BUDGETS
MONTGOMERIE PARK SCHOOL 28,379,987 15,339,385 28,379,987 0 14,243,387 14,243,387 (0) (0) 01-Aug-24 01-Aug-24 Construction On Target On Target
UNIVERSAL FREE SCHOOL MEALS EXPANSION 3,054,802 0 3,054,802 0 (1) 0 1 1 31-Mar-24 31-Mar-24 Tender On Target On Target
UFSM ARDEER PRIMARY SCHOOL 4,400 3,717 4,400 0 3,717 3,717 (0) (0) 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM BEITH PRIMARY SCHOOL 22,500 0 22,500 0 0 0 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM BRODICK PRIMARY SCHOOL 124,102 124,101 124,102 0 2,768 2,768 (0) (0) Complete Complete Complete Complete Complete
UFSM CORRIE PRIMARY SCHOOL 53,977 53,977 53,977 0 1,182 1,182 0 0 Complete Complete Complete Complete Complete
UFSM CORSEHILL PRIMARY SCHOOL 119,880 9,255 119,880 0 9,255 9,255 (0) (0) 31-Aug-25 31-Aug-25 Tender On Target On Target
UFSM GARNOCK COMMUNITY CAMPUS 92,159 7,159 92,159 0 7,159 7,159 0 0 31-Aug-25 31-Aug-25 Tender On Target On Target
UFSM GLEBE PRIMARY SCHOOL 2,046,397 2,528 2,046,397 0 2,528 2,528 0 0 31-Jul-28 31-Jul-28 Tender On Target On Target
UFSM GLENCAIRN PRIMARY SCHOOL 3,653 3,653 3,653 0 3,653 3,653 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM HAYOCKS PRIMARY SCHOOL 102,240 10,150 102,240 0 10,150 10,150 0 0 31-Aug-25 31-Aug-25 Development On Target On Target
UFSM KILMORY PRIMARY SCHOOL 62,486 57,473 62,486 0 57,473 57,473 0 0 31-Aug-24 31-Aug-24 Tender On Target On Target
UFSM LARGS PRIMARY SCHOOL 148,533 148,533 148,533 0 0 0 0 0 Complete Complete Complete Complete Complete
UFSM LOUDOUN-MONTGOMERY PRIMARY SCHOOL 2,082,540 1,463 2,082,540 0 1,463 1,463 (1) (1) 31-Aug-28 31-Aug-28 Tender On Target On Target
UFSM PENNYBURN PRIMARY SCHOOL 8,400 3,560 8,400 0 3,560 3,560 0 0 31-Dec-24 31-Dec-24 Tender On Target On Target
UFSM SHISKINE PRIMARY SCHOOL 6,616 6,616 6,616 0 544 544 (0) (0) Complete Complete Complete Complete Complete
UFSM WEST KILBRIDE PRIMARY SCHOOL 2,251,068 208,597 2,251,068 0 2,226 2,226 (0) (0) 31-Jul-27 31-Jul-27 On Site On Target On Target
UFSM WHITEHIRST PARK PRIMARY 102,734 2,734 102,734 0 2,734 2,734 0 0 31-Aug-24 31-Aug-24 Construction On Target On Target
UFSM WHITING BAY PRIMARY SCHOOL 21,822 21,822 21,822 0 21,822 21,822 0 0 30-Sep-23 31-May-24 Construction On Target On Target
Total Primary Education 50,154,297 27,470,725 50,154,297 0 19,303,072 19,303,072 (0) 0 (0) 
Secondary Schools
KILWINNING LEARNING ENVIRONMENT 2,774,121 2,534,058 2,774,121 0 107,024 107,024 (0) (0) 31-Mar-24 30-Aug-24 Construction On Target On Target
ARDROSSAN NEW BUILD 78,855,718 2,577,804 78,855,718 0 1,088,162 1,088,162 0 0 31-Aug-26 31-Aug-26 In Development On Target On Target
Total Secondary Education 81,629,839 5,111,862 81,629,839 0 1,195,186 1,195,186 0 0 0
Special Education
LOCKHART CAMPUS 25,345,985 25,246,058 25,345,985 0 41,016 41,016 (0) (0) Complete Complete Snagging Complete Complete
Total Special Education 25,345,985 25,246,058 25,345,985 0 41,016 41,016 (0) 0 (0)
Schools Other
CO2 MONITORS IN SCHOOLS 298,000 194,980 298,000 0 43,523 43,523 (0) (0) 31-Mar-25 31-Mar-25 Planning On Target On Target
SCHOOLS ICT INVESTMENT * 634,123 634,123 634,123 0 634,123 634,123 0 0 31-Mar-24 31-Mar-24 On-going On Target On Target
Total Schools Other 932,123 829,103 932,123 0 677,646 677,646 0 0 0
Information & Culture
CASTLES & HISTORIC MONUMENTS 0 0 0 0 0 0 0 0 Holding Code Holding Code Holding Code Holding Code Holding Code
ABBEY TOWER 6,563 6,563 6,563 0 0 0 0 0 31-Mar-25 31-Mar-25 Planning On Hold On Hold
Total Information & Cultural 6,563 6,563 6,563 0 0 0 0 0 0
Completed Projects
GARNOCK CAMPUS 40,304,366 40,304,366 40,304,366 0 0 0 0 0 Complete Complete Complete Complete Complete
AUCHENHARVIE SECONDARY ESTATE LEARNING ENVT 3,111,334 3,111,334 3,111,334 0 0 0 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 43,415,700 43,415,700 43,415,700 0 0 0 0 0 0
Total Communities 217,943,975 118,316,388 217,943,975 0 21,653,923 21,653,923 0 0 0
112

Page 113

CHIEF EXECUTIVE
MILESTONE
Total Project Budget                   
Cumulative
Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual
Expenditure to
31st March 2024
Actual Over/
(Under) Spend for
2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £
Council IT Strategy
ICT INVESTMENT FUND 4,041,571 1,129,571 4,041,571 0 219,838 219,838 (0) (0) 31-Mar-26 31-Mar-26 On-going On Target On Target
WAN 912,107 412,107 912,107 0 9,910 9,910 (0) (0) 31-Mar-28 31-Mar-28 Implementation On Target On Target
LAN/WiFi 2,670,042 1,170,042 2,670,042 0 225,880 225,880 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
TELEPHONY 1,147,576 252,026 1,147,576 0 24,383 24,383 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
Total IT Strategy 8,771,296 2,963,746 8,771,296 0 480,011 480,011 0 0 0
Total Chief Executive 8,771,296 2,963,746 8,771,296 0 480,011 480,011 0 0 0   
CAPITAL MONITORING 2023/24
CommentsProject Description
COMPLETION DATESTOTAL PROJECT DELIVERY STATUS2023/24 BUDGETS
113

Page 114

HEALTH & SOCIAL CARE
MILESTONE
Total Project
Budget                   
Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual Expenditure
to 31st March 2024
Actual Over/
(Under) Spend for
2023/24  
True Over/(Under)
Spend            
Brought / Carry
Forward to 2024/25 Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £
Management & Support
COMMUNITY ALARMS - ANALOGUE TO DIGITAL 1,044,471 906,518 1,044,471 0 902,328 902,328 (0) (0) 31-Dec-24 31-Dec-24 In progress On Target On Target
CAREFIRST REPLACEMENT 267,993 267,993 267,993 0 0 0 0 0 31-Aug-24 31-Mar-25 In development On Target On Target
47 WEST ROAD 269,350 15,163 269,350 0 15,163 15,163 (0) (0) 21-Jun-24 21-Jun-24 Refurbishment On Target On Target
Total Management & Support 1,581,814 1,189,674 1,581,814 0 917,491 917,491 (0) 0 (0)
Housing Non HRA
IMPROVEMENT GRANTS * 0 0 0 0 0 0 0 0 31-Mar-24 31-Mar-24 Ongoing On Target On Target 
Total Housing Non HRA 0 0 0 0 0 0 0 0 0
Adults
TRINDLEMOSS 4,611,528 4,594,773 4,611,528 0 4,742 4,742 (0) (0) Complete Complete Complete Complete Complete
Total Older People 4,611,528 4,594,773 4,611,528 0 4,742 4,742 (0) 0 (0)
Young People
RESIDENTIAL & RESPITE UNIT 5,579,718 5,224,534 5,579,718 0 7,993 7,993 (0) (0) Complete Complete Snagging Complete Complete
Total Young People 5,579,718 5,224,534 5,579,718 0 7,993 7,993 (0) 0 (0)
Total Health & Social Care 11,773,060 11,008,980 11,773,060 0 930,226 930,225 0 0 0
CommentsProject Description
DELIVERY STATUS
CAPITAL MONITORING 2023/24
2023/24 BUDGETSTOTAL PROJECT COMPLETION DATES
114

Page 115

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual
Expenditure to
31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £
Roads
ROADS IMPROVE/RECONSTRUCTION * 4,571,362 4,571,362 4,571,362 0 4,571,362 4,571,362 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target 
ROAD SAFETY IMPROVEMENT FUND 258,431 258,431 258,431 0 258,431 258,431 0 0 31-Mar-24 31-Mar-24 In Development On Target On Target
A737 DALRY BYPASS 375,735 375,735 375,735 0 375,735 375,735 0 0 Complete Complete Complete Complete Complete
PANEL REINSTATEMENT WORKS 0 0 0 0 0 0 0 0 31-Mar-25 31-Mar-25 In Development On Target On Target
ROADS REMEDIATION WORKS 0 0 0 0 0 0 0 0 31-Mar-25 31-Mar-25 In Development On Target On Target
TRAFFIC CALMING 175,000 92,047 175,000 0 0 0 0 0 31-Mar-25 31-Mar-25 In Development On Target On Target
DOCKHEAD STREET SALTCOATS 100,000 0 100,000 0 0 0 0 0 31-Mar-25 31-Mar-25 In development On Target On Target
LIGHTING * 1,008,270 1,008,270 1,008,270 0 1,008,270 1,008,270 (0) (0) 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target 
LED LIGHTING REPLACEMENT 682,245 141,415 682,245 0 141,415 141,415 0 0 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target
A737 DALRY BYPASS LIGHTING 20,684 16,610 20,684 0 16,610 16,610 0 0 Complete Complete Complete Complete Complete
UPPER GARNOCK FPS 18,581,293 18,113,466 18,581,293 0 677,493 677,493 0 0 Complete Complete Complete Complete Complete
MILLPORT COASTAL FPS 51,190,678 31,155,677 51,190,678 0 29,315,263 29,315,263 (0) (0) 31-Aug-24 30-Sep-24 Construction On Target On Target
MILLBURN FPS 1,749,432 295,902 1,749,432 0 42,432 42,432 (1) (1) 31-Jul-24 31-Jul-25 In Development On Target Slightly off target  Delays due to wait for permission from Scottish Water
MILLPORT PIER 460,000 150,080 460,000 0 0 0 0 0 31-Dec-25 31-Dec-25 In Development On Target On Target
BRIDGES INFRASTRUCTURE PROG * 754,329 754,329 754,329 0 754,329 754,329 (0) (0) 31-Mar-24 31-Mar-24 Multiple Projects On Target On Target 
LARGS PROMENADE SEAWALL 3,537,966 3,437,967 3,537,966 0 3,104,012 3,104,012 0 0 30-Apr-24 31-Jul-24 Construction On Target On Target
COASTAL ADAPTATIONS 198,727 0 198,727 0 0 0 0 0 31-Mar-25 31-Mar-25 In Development On Target On Target
B714 UPGRADE 31,849,093 2,295,704 31,849,093 0 1,406,445 1,406,445 0 0 31-Jul-26 30-Nov-26 In Development On Target Significantly off
target
Confirmation of Levelling Up Fund (LUF) fudning
awaiting approval of full Business Case is approved.
Completion due by March 2025 but land purchase may
be complex and time consuming and construction costs
are escalating due to ongoing inflationary pressures.
LARGS CAR PARK INFRASTRUCTURE 55,128 55,128 55,128 0 661 661 0 0 Complete Complete Complete Complete Complete
PARKING CHARGES & DPE 80,025 80,025 80,025 0 0 (0) (0) (0) 31-Mar-24 31-Mar-24 In Development On Target On Target
Total Roads 115,648,396 62,802,145 115,648,396 0 41,672,458 41,672,458 (0) 0 (0)
Project Description
TOTAL PROJECT 2023/24 BUDGETS DELIVERY STATUS
Comments
CAPITAL MONITORING 2023/24
COMPLETION DATES
115

Page 116

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual
Expenditure to
31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
Project Description
TOTAL PROJECT 2023/24 BUDGETS DELIVERY STATUS
Comments
CAPITAL MONITORING 2023/24
COMPLETION DATES
Streetscene
CEMETERY EXTNS, WALLS & INFRA * 411,058 0 411,058 0 (1) 0 1 1 Holding Code Holding Code Holding Code Holding Code Holding Code
CMTY, LAMLASH - EXTENSION 715,065 715,065 715,065 0 0 0 0 0 Complete Complete Complete Complete Complete
CMTY, ARDROSSAN - PLOTS/WALLS 159,535 159,534 159,535 0 3,477 3,477 (0) (0) Complete Complete Complete Complete Complete
CMTY, KILBIRNIE - WORKS 25,383 25,383 25,383 0 0 0 0 0 Complete Complete Complete Complete Complete
HAYLIE BRAE CEMETERY 455 455 455 0 455 455 0 0 Complete Complete Complete Complete Complete
DALRY CEMETERY 250 250 250 0 250 250 0 0 Complete Complete Complete Complete Complete
CMTY, KILWINNING - NEW 1,404,137 1,404,137 1,404,137 0 139,609 139,609 0 0 Complete Complete Complete Complete Complete
CMTY, KNADGERHILL - EXTENSION 415,470 415,470 415,470 0 660 660 0 0 Complete Complete Complete Complete Complete
CMTY, WEST KILBRIDE - WORKS 398,033 379,884 398,033 0 18,743 18,743 (0) (0) Complete Complete Complete Complete Complete
CMTY, STEV HIGH ROAD - WORKS 507,277 507,278 507,277 0 137,807 137,807 0 0 Complete Complete Complete Complete Complete
ARDROSSAN CEMETERY NEW 603 603 603 0 0 0 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, BRODICK - NEW 10,341 10,341 10,341 0 3,320 3,320 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, KILBIRNIE - WALLS 110,804 38,661 110,804 0 23,035 23,035 0 0 31-Mar-25 31-Mar-25 Tender awarded On Target On Target
CMTY, BEITH - WALLS 198,653 101,320 198,653 0 86,685 86,685 0 0 31-Mar-25 31-Mar-25 Tender awarded On Target On Target
CMTY, ABBEY TOWER - WALLS 151,812 11,337 151,812 0 5,285 5,285 0 0 31-Aug-25 31-Aug-25 Feasibility Works On Target On Target
CMTY, STEV HAWKHILL - WALLS 129,840 9,840 129,840 0 3,980 3,980 0 0 31-Aug-25 31-Aug-25 Feasibility Works On Target On Target
CMTY, WEST KILBRIDE - WALLS 101,528 6,964 101,528 0 2,360 2,360 0 0 On Hold On Hold On Hold On Hold On Hold
CMTY, MILLPORT - WALLS 2,846 2,846 2,846 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, ARDROSSAN - WALLS 4,338 4,338 4,338 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, IRVINE OP CHURCH - WALLS 2,775 2,775 2,775 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, DREGHORN - WALLS 8,240 8,240 8,240 0 4,980 4,980 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, KILBIRNIE BARONY - WALLS 1,828 1,828 1,828 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, LAMLASH - WALLS 3,627 3,627 3,627 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, STEV HIGH KIRK - WORKS 22,754 22,754 22,754 0 0 0 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, KILBIRNIE - NEW 1,502,525 37,443 1,502,525 0 26,156 26,156 (0) (0) 31-Mar-26 31-Mar-26 Feasibility Works On Target On Target
CMTY, DALRY - WALLS 2,450 2,450 2,450 0 0 0 0 0 On Target On Target
CMTY, ARDROSSAN - EXTENSION 14,703 14,703 14,703 0 14,703 14,703 (1) (1) 31-Mar-25 31-Mar-25 Planning On Target On Target
COASTAL PLAY PARKS 420,065 420,065 420,065 0 420,065 420,065 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
STREET FURNITURE IMPROVEMENT 176,304 176,304 176,304 0 106,835 106,835 (0) (0) 31-Mar-24 31-Mar-24 Planning On Target On Target
PARK ENABLING WORKS 148,678 148,678 148,678 0 63,315 63,315 (0) (0) 31-Mar-24 31-Mar-24 Planning On Target On Target
RENEWAL OF PLAY PARKS 1,350,750 425,750 1,350,750 0 316,462 316,462 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
Total Streetscene 8,402,126 5,058,321 8,402,126 0 1,378,181 1,378,182 1 0 1
Transport
VEHICLES * 3,044,751 3,044,752 3,044,751 0 3,044,751 3,044,752 1 1 31-Mar-24 31-Mar-24 Ongoing On Target On Target 
WORKPLACE CHARGERS 298,416 298,416 298,416 0 73,013 73,013 (0) (0) Complete Complete Complete Complete Complete
FLEET DECARBONISATION 6,572,624 112,459 6,572,624 0 74,874 74,874 (0) (0) 31-Mar-24 31-Mar-24 Ongoing On Target On Target
Total Transport 9,915,791 3,455,627 9,915,791 0 3,192,638 3,192,638 0 0 0
Waste Services
SHEWALTON LANDFILL 13,321,491 13,272,542 13,321,491 0 0 0 0 0 Complete Complete Complete Complete Complete
Total Waste Services 13,321,491 13,272,542 13,321,491 0 0 0 0 0 0
Renewable Energy
SOLAR PV RETROFIT EXTENSION 42,635 42,635 42,635 0 621 621 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target 
SOLAR PV INVESTMENT - NETHERMAINS 7,407,521 843,838 7,407,521 0 698,157 698,157 (0) (0) 30-Apr-24 30-Apr-24 Work Ongoing On Target On Target
SOLAR PV INVESTMENT - SHEWALTON 5,614,813 607,802 5,614,813 0 509,692 509,692 0 0 30-Oct-24 30-Oct-24 Work Ongoing On Target On Target
NON DOMESTIC ENERGY EFFICIENCY PROGRAMME 936,411 936,411 936,411 0 0 0 0 0 31-Mar-24 31-Mar-24 Work Ongoing On Target On Target 
NATURE RESTORATION FUND 511,000 0 511,000 0 0 0 0 0 31-Aug-24 31-Aug-24 Planning On Target On Target 
Total Renewable Energy 14,512,381 2,430,687 14,512,381 0 1,208,470 1,208,470 0 0 0
116

Page 117

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual
Expenditure to
31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
Project Description
TOTAL PROJECT 2023/24 BUDGETS DELIVERY STATUS
Comments
CAPITAL MONITORING 2023/24
COMPLETION DATES
Office Accommodation
PROPERTY LIFECYCLE INVESTMENT * (1) 0 (1) 0 (1) 0 1 1 31-Mar-24 31-Mar-24 Mulitple projects On Target On Target 
PLI CASTLEVIEW DAY SERVICES 75,349 75,349 75,349 0 75,349 75,349 0 0 31-May-24 31-May-24 Construction On Target On Target
PLI CENTRAL AVE STREETSCENE DEPOT* 6,325 6,325 6,325 0 6,325 6,325 (0) (0) Complete Complete Complete Complete Complete
PLI WEST KILBRIDE CEMETERY 26,399 26,399 26,399 0 26,399 26,399 (1) (1) Complete Complete Complete Complete Complete
PLI BEITH CEMETERY 69 69 69 0 69 69 (0) (0) Complete Complete Complete Complete Complete
PLI TOWNEND CC 7,949 7,949 7,949 0 7,949 7,949 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE COMMUNITY CENTRE 650 650 650 0 650 650 0 0 Complete Complete Complete Complete Complete
PLI PORTLAND PLACE 17,267 17,267 17,267 0 17,267 17,267 0 0 Complete Complete Complete Complete Complete
PLI WEST BYREHILL DEPOT 103,115 103,115 103,115 0 103,115 103,115 0 0 Complete Complete Complete Complete Complete
PLI GOLDCRAIGS DEPOT 115,517 5,628 115,517 0 5,628 5,628 0 0 31-Mar-25 31-Mar-25 Planning On Target On Target
PLI ANNICK PRIMARY SCHOOL 186 186 186 0 186 186 0 0 Complete Complete Complete Complete Complete
PLI ARDEER PRIMARY SCHOOL 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLI BEITH PRIMARY SCHOOL 1,957 1,957 1,957 0 1,957 1,957 (0) (0) Complete Complete Complete Complete Complete
PLI CASTLEPARK PRIMARY SCHOOL 84,253 84,253 84,253 0 84,253 84,253 (0) (0) Complete Complete Complete Complete Complete
PLI CUMBRAE PRIMARY 3,867 3,867 3,867 0 3,867 3,867 (1) (1) Complete Complete Complete Complete Complete
PLI DALRY PRIMARY SCHOOL 129,299 60,985 129,299 0 60,985 60,985 0 0 Complete Complete Complete Complete Complete Pitch repair work completed. Floor slab repairs now
postponed.PLI DREGHORN PRIMARY SCHOOL 65,847 65,847 65,847 0 65,847 65,847 0 0 Complete Complete Complete Complete Complete
PLI GLENCAIRN PRIMARY SCHOOL 4,469 4,469 4,469 0 4,469 4,469 (0) (0) Complete Complete Complete Complete Complete
PLI LOUDOUN MONTGOMERY PS 2,395 2,395 2,395 0 2,395 2,395 0 0 Complete Complete Complete Complete Complete
PLI MAYFIELD PRIMARY 4,850 4,774 4,850 0 4,774 4,774 0 0 Complete Complete Complete Complete Complete
PLI PENNYBURN PRIMARY 169,251 169,251 169,251 0 169,251 169,251 (0) (0) Complete Complete Complete Complete Complete
PLI SKELMORLIE PRIMARY SCHOOL 531,946 37,446 531,946 0 37,446 37,446 (0) (0) Complete Complete Complete Complete Complete Change in scope. No further work anticiapted for
heating replacement.PLI ST BRIDGETS PRIMARY 20,184 20,184 20,184 0 20,184 20,184 (0) (0) Complete Complete Complete Complete Complete
PLI ST JOHN OGILVIE PRIMARY SCHOOL 6,744 6,744 6,744 0 6,744 6,744 0 0 Complete Complete Complete Complete Complete
PLI AUCHENHARVIE ACADEMY* 429,457 429,457 429,457 0 429,457 429,457 (0) (0) Complete Complete Complete Complete Complete
PLI IRVINE ROYAL ACADEMY* 974 974 974 0 974 974 0 0 Complete Complete Complete Complete Complete
PLI KILWINNING ACADEMY 187,957 187,957 187,957 0 187,957 187,957 (0) (0) Complete Complete Complete Complete Complete Underlying structural issues identified during
constuction work which now requires remedial action. PLI KYLE ROAD UNIT 34 4,069 4,069 4,069 0 4,069 4,069 (0) (0) Complete Complete Complete Complete Complete
PLI BRIDGEGATE HOUSE 167,029 12,912 167,029 0 12,912 12,912 0 0 30-Sep-24 30-Sep-24 Planning On Target On Target
PLI CUNNINGHAME HOUSE 0 0 0 0 0 0 0 0 On Hold On Hold On Hold On Hold On Hold
PLI ACHNAMARA CHILDREN'S UNIT 11,954 11,954 11,954 0 11,954 11,954 (0) (0) Complete Complete Complete Complete Complete
PLI THE MEADOWS 39,513 39,513 39,513 0 39,513 39,513 0 0 Complete Complete Complete Complete Complete
PLI ANAM CARA 108,259 108,259 108,259 0 108,259 108,259 (0) (0) Complete Complete Complete Complete Complete
PLI TAIGH MOR 5,153 5,153 5,153 0 5,153 5,153 0 0 Complete Complete Complete Complete Complete
PLI VIKINGAR 3,096 3,096 3,096 0 3,096 3,096 0 0 Complete Complete Complete Complete Complete
PLI EGLINTON CASTLE 48,000 0 48,000 0 0 0 0 0 31-Mar-24 31-Oct-24 Planning On Target On Target
PLI GARNOCK CAMPUS 6,315 6,315 6,315 0 6,315 6,315 (0) (0) Complete Complete Complete Complete Complete
PLI THE PORTAL 47,754 47,754 47,754 0 47,754 47,754 (0) (0) Complete Complete Complete Complete Complete
Total Office Accommodation 2,437,417 1,562,521 2,437,417 0 1,562,521 1,562,521 (0) 0 (0)
Other Property
INDUSTRIAL PORTFOLIO * 0 0 0 0 0 0 0 0 On Hold On Hold On Hold On Hold On Hold
HOME 289,971 289,971 289,971 0 1,323 1,323 (0) (0) Complete Complete Complete Complete Complete
BUILD 47,749 47,749 47,749 0 1,500 1,500 0 0 Cancelled Cancelled Cancelled Complete Complete
EMERGENCY CONTROL CTR 67,191 67,191 67,191 0 65,971 65,971 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
GOLDCRAIGS REFURBISHMENT 766,000 36,650 766,000 0 11,650 11,650 0 0 31-Mar-26 31-Mar-26 In development On Target On Target
GALLOWGATE TOILETS 275,803 275,803 275,803 0 246,153 246,153 0 0 Complete Complete Complete Complete Complete
WOODLANDS PRIMARY PLAYINGFIELD DRAINAGE 134,641 109,065 134,641 0 2,943 2,943 0 0 Complete Complete Complete Complete Complete
Total Property 1,581,355 826,429 1,581,355 0 329,540 329,540 (0) 0 (0)   
Other Housing
CCTV REVIEW 350,000 0 350,000 0 0 0 0 0 31-Mar-25 31-Mar-25 Planning On Target On Target
2-4 BOYLE STREET HOSTEL 231,905 231,905 231,905 0 142,930 142,930 0 0 Complete Complete Complete Complete Complete
Total Other Housing 581,905 231,905 581,905 0 142,930 142,930 0 0 0
117

Page 118

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual
Expenditure to
31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
Project Description
TOTAL PROJECT 2023/24 BUDGETS DELIVERY STATUS
Comments
CAPITAL MONITORING 2023/24
COMPLETION DATES
Regeneration
TOWN CENTRE REGENERATION 1,177,541 1,177,541 1,177,541 0 181,573 181,573 (0) (0) Complete Complete Complete Complete Complete
REPURPOSING PROPERTY GRANT FUND 250,680 680 250,680 0 0 0 0 0 30-May-25 30-May-25 In development On Target On Target
MILLPORT TOWN HALL REGENERATION 533,492 533,492 533,492 0 0 0 0 0 Complete Complete Complete Complete Complete
MILLPORT TOWN HALL PHASE 2 0 0 0 0 0 0 0 0 31-May-23 31-Mar-24 Construction On Target Significantly off
target
GARRISON HOUSE PROJECT 0 0 0 0 0 0 0 0 31-Mar-24 31-Mar-24 In development On Target On Target
ISLANDS PIT STOPS 500,000 0 500,000 0 0 0 0 0 31-Jul-24 31-Jul-24 In development On Target On Target
ISLAND INFRASTRUCTURE FUND 199,000 118,626 199,000 0 0 0 0 0 31-Mar-24 31-Dec-24 In development On Target On Target
DYEMILL BIKE PARK PROJECT 0 0 0 0 0 0 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
ISLANDS COST CRISIS FUND 0 0 0 0 0 0 0 0 Complete Complete Complete Complete Complete
PLACE BASED INVESTMENT PROGRAMME (PBIP) 420,680 30,777 420,680 0 (1) 0 1 1 31-Mar-26 31-Mar-26 In development On Target On Target
UK SHARED PROSPERITY FUND (SPF) 0 (0) 0 0 0 (0) (0) (0) 31-Mar-25 31-Mar-25 In development On Target On Target
DIGITAL - SIPP GREAT HARBOUR 242,765 0 242,765 0 0 0 0 0 31-Mar-25 30-Jul-25 Planning On Target On Target
AYRSHIRE 5GIR 3,810,935 19,935 3,810,935 0 19,935 19,935 (1) (1) 31-Mar-25 31-Mar-25 Planning On Target On Target
PBIP – KILWINNING ABBEY IMPROVEMENTS 235,354 0 235,354 0 0 0 0 0 31-Mar-25 31-Mar-25 In development On Target On Target
LOCHSHORE HUB PLAY AREA 437,183 42,183 437,183 0 42,183 42,183 0 0 30-Jun-24 30-Jun-24 Construction On Target On Target
PBIP 36 BANK STREET 157,238 107,238 157,238 0 24,066 24,066 (0) (0) 31-Dec-25 31-Dec-25 In development On Target On Target
PBIP GALT HOUSE 49,125 4,125 49,125 0 4,125 4,125 0 0 31-Mar-24 31-Mar-25 In development On Target On Target
IRVINE HIGH STREET 2,813,316 2,736,001 2,813,316 0 14,647 14,647 (0) (0) Complete Complete Complete Complete Complete
MILLPORT CARS 0 0 0 0 0 0 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
MONTGOMERIE PARK MASTERPLAN 4,215,504 1,791,840 4,215,504 0 16,907 16,907 0 0 31-Mar-30 31-Mar-30 In development On Target On Target
LOCHSHORE, KILBIRNIE 1,993,374 1,904,016 1,993,374 0 262,236 262,236 (0) (0) 31-May-25 31-May-25 In development On Target On Target
LOCHSHORE GARNOCK HUB 4,146,387 4,087,008 4,146,387 0 3,238 3,238 (0) (0) Complete Complete Complete Complete Complete
VDLF 2024/25 ALLOCATION 963,000 0 963,000 0 0 0 0 0
VDLF - KYLE ROAD PHASE 2 1,362,231 145,005 1,362,231 0 4,165 4,165 0 0 31-Mar-24 31-Dec-26 In development On Target On Target
VDLF - ANNICKBANK PH 3* 1,892,786 1,892,786 1,892,786 0 1,816,525 1,816,525 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
LUF3 - ANNICKBANK 50,000 0 50,000 0 0 0 0 0 31-Mar-26 31-Mar-26 In development On Target On Target
VDLF - DEVELOPMENT WORK* 227,478 93,467 227,478 0 (1) 0 1 1 31-Mar-25 31-Mar-25 In development On Target On Target
VDLF - TREE PLANTING 50,000 2,400 50,000 0 0 0 0 0 31-Dec-24 31-Dec-24 In development On Target On Target
MONTGOMERIE PARK NEIGHBOURHOOD CTR 140,000 0 140,000 0 0 0 0 0 31-Mar-24 31-Dec-24 In development On Target On Target
VDLF STALLED SPACES FUND 125,000 0 125,000 0 0 0 0 0 31-Mar-24 31-Mar-25 In development On Target On Target
QUARRY ROAD PHASE 2 5,204,719 5,204,719 5,204,719 0 0 0 0 0 Complete Complete Complete Complete Complete
CYCLING/WALKING/SAFER STREETS * 1,342,326 2,135,422 1,342,326 0 1,342,326 1,342,326 (0) (0) 31-Mar-24 31-Mar-24 Various On Target On Target
ACCESS PATH NETWORK PROGRAMME * 23,414 23,415 23,414 0 23,414 23,415 1 1 31-Mar-24 31-Mar-25 Various On Target On Target
FAIRLIE COASTAL PATH 191,085 191,085 191,085 0 191,085 191,085 (0) (0) 31-Dec-23 01-Jun-24 Construction On Target On Target
IRVINE CYCLE FRIENDLY TOWN 48,505 514,703 48,505 0 48,505 48,505 (0) (0) 31-Mar-24 31-Mar-24 Pre Construction On Target On Target
BRODICK TO CORRIE CYCLE PATH 79,192 139,391 79,192 0 79,192 79,192 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
ARDROSSAN PROMENADE 209,501 209,501 209,501 0 209,501 209,501 0 0 31-Mar-24 31-Dec-24 Construction On Target On Target
BUS CORRIDOR IMPROVEMENTS 215,373 215,374 215,373 0 26,332 26,332 0 0 31-Mar-24 31-Mar-24 Various On Target On Target
CUMBRAE FERRY & BUS STOP 212,514 212,514 212,514 0 72,967 72,967 0 0 31-Mar-24 31-Mar-24 Construction On Target On Target
KILBIRNIE TO KILWINNING 18,334 18,333 18,334 0 18,334 18,333 (1) (1) 31-Mar-24 31-Mar-24 Planning On Target On Target
B714 ACTIVE TRAVEL IMPROVEMENTS 346,710 346,710 346,710 0 246,710 246,710 (0) (0) 31-Mar-24 31-Mar-24 Construction On Target On Target
B777 CORRIDOR IMPROVEMENTS 95,965 84,569 95,965 0 79,769 79,769 (0) (0) 31-Mar-24 30-Jun-24 Planning On Target On Target
CYCLE SHELTER 11,409 11,409 11,409 0 11,409 11,409 0 0 Complete Complete Complete Complete Complete
NCN73 ACCESSABILITY IMPROVEMENTS 15,882 15,882 15,882 0 15,882 15,882 (0) (0) 31-Mar-24 31-Mar-24 Planning On Target On Target
NCN753 LARGS PROMENADE 40,034 40,034 40,034 0 40,034 40,034 0 0 31-Mar-24 31-Mar-24 Design On Target On Target
LINKS TO EGLINTON PARK 88,874 88,874 88,874 0 88,874 88,874 (0) (0) 31-Mar-24 31-Mar-24 Construction On Target On Target
COMMUNITY BUS FUND 86,541 86,541 86,541 0 86,541 86,541 0 0 31-Mar-24 31-Mar-24 Planning On Target On Target
SALTCOATS OLD CAL RAILWAY PH1 192,222 192,223 192,222 0 137,147 137,148 1 1 Complete Complete Complete Complete Complete
SALTCOATS OLD CAL RAILWAY PH2 47,881 47,880 47,881 0 47,881 47,880 (2) (2) 31-Mar-24 31-Mar-24 Design On Target On Target
Total Regeneration 34,463,550 24,465,696 34,463,550 0 5,155,501 5,155,501 (0) 0 (0)
Community led regeneration project by Millport Town
Hall Charity. Project has been delayed due to
construction challenges. The Council's   Regeneration
team continues to support MTHC in the delivery of the
project.
118

Page 119

PLACE
MILESTONE
Total Project Budget                    Cumulative
Expenditure to date                  Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Actual
Expenditure to
31st March 2024
Actual Over/
(Under) Spend for
2023/24
True Over/
(Under) Spend         
Brought / Carry
Forward to
2024/25
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
Project Description
TOTAL PROJECT 2023/24 BUDGETS DELIVERY STATUS
Comments
CAPITAL MONITORING 2023/24
COMPLETION DATES
Ayrshire Growth Deal
AYRSHIRE GROWTH DEAL 0 0 0 0 0 0 0 0 31-Mar-26 31-Mar-26 On Target On Target
AGD - I3 DPMC PHASE 1 976,700 276,251 976,700 0 270,802 270,802 (0) (0) 31-Mar-26 31-Mar-26 Delivery On Target On Target
AGD - I3 DPMC PHASE 2 5,004,072 289,385 5,004,072 0 49,970 49,970 (0) (0) 31-Mar-26 31-Mar-29 Feasibility On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 1 5,476,981 3,457,835 5,476,981 0 2,912,412 2,912,412 0 0 31-Oct-24 31-Oct-24 Construction On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 2 10,950,840 50,840 10,950,840 0 50,840 50,840 0 0 31-Mar-28 31-Mar-28 Multiple Projects On Target On Target
AGD - HUNTERSTON - CENTRE OF LOW CARBON ENERGY & CIRCULAR
ECONOMY
18,037,332 249,560 18,037,332 0 17,332 17,332 (0) (0) 31-Mar-30 31-Mar-30 Feasibility On Target On Target
AGD - GREAT HARBOUR 14,223,869 1,019,367 14,223,869 0 421,277 421,277 0 0 31-Mar-28 31-Mar-29 Multiple Projects On Target On Target
AGD - IMSE 10,467,734 151,247 10,467,734 0 17,734 17,734 0 0 31-Mar-30 31-Mar-30 Feasibility On Target On Target
AGD - MARINE TOURISM ARDROSSAN 5,060,675 336,390 5,060,675 0 1,694 1,694 (0) (0) Complete Complete Complete Complete Complete
AGD - MARINE TOURISM ARRAN 1,991,255 93,999 1,991,255 0 33,515 33,515 (0) (0) 31-Mar-29 31-Mar-29 Feasibility On Target On Target
AGD - MARINE TOURISM CUMBRAE 4,475,788 129,534 4,475,788 0 61,355 61,355 0 0 31-Mar-29 31-Mar-29 Design On Target On Target
Total Ayrshire Growth Deal 76,665,247 6,054,407 76,665,247 0 3,836,931 3,836,931 (0) 0 (0)
Growth & Investment
ARDROSSAN HARBOUR INTERCHANGE 4,115,083 551,424 4,115,083 0 95,971 95,972 1 1 1st Qtr 2026 1st Qtr 2026 Design On Target On Target
IRVINE ENTERPRISE AREA 10,746,072 0 10,746,072 0 0 0 0 0 Ongoing Ongoing Multiple Projects On Target On Target
LOW CARBON HUB 613,828 613,827 613,828 0 501,823 501,823 (0) (0) 30-Sep-24 30-Sep-24 Multiple Projects On Target On Target
ARDROSSAN NORTH SHORE 37,069,194 5,926,109 37,069,194 0 3,092,343 3,092,343 (0) (0) 27-May-24 31-Mar-25 Construction On Target On Target
VDLF - HARBOUR MASTERS OFFICE 158,700 26,378 158,700 0 5,446 5,446 (0) (0) 31-Mar-24 31-Mar-25 Design On Target On Target
VDLF - I3 IRVINE ENTERPRISE 257,020 257,020 257,020 0 0 0 0 0 31-Mar-24 31-Mar-25 Design On Target On Target
Other Growth & Investment 52,959,897 7,374,760 52,959,897 0 3,695,583 3,695,584 1 0 1
Total Economic Development & Regeneration 164,088,693 37,894,863 164,088,693 0 12,688,015 12,688,015 0 0 0
Completed Projects
BIOMASS RETROFIT PROGRAMME 3,378,163 3,378,163 3,378,163 0 0 0 0 0 Complete Complete Complete Complete Complete
QUARRY ROAD PHASE 1 2,977,098 2,947,722 2,977,098 0 11,219 11,219 0 0 Complete Complete Defects Period Complete Complete
ARDROSSAN HOSTEL 0 0 0 0 Complete Complete Complete Complete Complete
Total Completed Projects 6,355,261 6,325,885 6,355,261 0 11,219 11,219 0 0 0
Total Place 336,844,817 133,860,925 336,844,817 0 62,185,972 62,185,972 0 0 0
119

Page 120

OTHER BUDGETS
AE
Total Project Budget                    Cumulative Expenditure to
date                 
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised
Budget 2023/24
Actual Expenditure
to 31st March 2024
Over/ (Under)
Spend for 23/24
£ £ £ £ £ £ £
FLEXIBILITY / IMPROVEMENT FUND 13,777,000 0 13,777,000 0 0 0 0
CORE INFRASTRUCTURE INVESTMENT 0 0 0 0 0 0 0
Total Other Budgets 13,777,000 0 13,777,000 0 0 0 0
2023/24 BUDGETS
CommentsProject Description
TOTAL PROJECT
120

Page 121

HRA Capital Statement 2324 2023-24 Appendix 2
TOTAL PROJECT CURRENT YEAR 2023/24 - Period 12
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Revised budget after
mgt fees adjustment
Actual Expenditure
to 31 March 2024 Virement Request
Carry /Brought
Forward to /From
2024/25
True Over/ (Under)
Spend
Delivery Status
Financial Delivery Status Physical Narrative
EXPENDITURE
Council House Building
Afton Court 1,335,654 1,268,527 1,335,654 0 681,987 701,234 614,860 (86,374) On Target Complete Complete, project contingency not required.
Ayrshire Central Site 51,235,455 3,208,079 51,235,455 0 600,000 620,328 649,428 29,100 On Target Significantly off target Tenders received and currently being checked. Project due to commence on site July 2024. 
Bourtreehill Village 9,924,743 190,985 9,924,743 0 85,000 88,917 125,120 36,203 On Target Significantly off target Project due to commence on site January 2025.
Brathwic Terrace 6,674,074 6,683,409 6,683,409 9,335 26,403 31,439 160,891 129,452 On Target Complete Complete
Caley Court 3,131,066 3,103,356 3,131,066 0 322,630 331,862 294,921 (36,941) On Target Complete Complete
Corsehillhead 2,032,906 262,558 2,032,906 0 0 0 49,959 49,959 On Target Significantly off target Options appraisal currently being carried out for the site due to projected costs being
significantly higher than previously projected.
Dalrymple Place 5,838,627 5,822,700 5,838,627 0 1,473 1,473 2,212 739 On Target Complete Complete
Flatt Road 20,178,000 19,708,540 19,934,544 (243,456) 302,327 304,716 76,323 (228,393) On Target Complete Complete
Friars Lawn 2,199,628 2,090,152 2,086,932 (112,696) 231,468 236,025 121,172 (114,853) On Target Complete Complete
Fullarton Street (High Flats) 12,073,511 33,330 12,073,511 0 50,000 50,000 7,395 (42,605) On Target Significantly off target New build project due to commence on site July 2025.
Garnock Academy Site 12,092,889 687,610 12,092,889 0 138,400 141,299 92,625 (48,674) On Target Significantly off target Project due to commence on site 17 June 2024.
Garrier Court 2,335,551 2,382,239 2,348,027 12,476 34,212 34,212 0 (34,212) (34,212) On Target Complete Complete
Glebe Place 2,075,877 0 2,075,877 0 0 0 0 On Target On Target Project deferred to 2026/27 following refurbishment of the block for Ukrainian funded by
the Scottish Government.
Harbourside 14,622,742 14,352,228 14,622,742 0 939,356 957,636 583,989 (373,647) (373,647) On Target Complete Complete
James McFarlane Site 4,784,118 849,535 4,784,118 0 450,000 464,806 472,985 8,179 On Target Significantly off target Project commenced on site 25 March 2024.
James Reid Site 11,820,675 967,814 12,279,460 458,785 0 3,293 105,211 101,918 On Target Significantly off target Project site start delayed due to non resolution of culvert maintenance issue
Kings Arms (113-115 High Street) 2,904,416 334,141 2,904,416 0 182,000 182,000 27,267 (154,733) On Target Significantly off target Project due to commence on site 13 May 2024.
Laburnum Ave/Newhouse Dr (Regen 1a&b) 3,274,506 1,290,229 2,953,447 (321,059) 450,000 498,517 1,290,134 791,617 On Target Significantly off target Project commenced on site 15 January 2024.
Largs Police Station 2,769,301 2,781,614 2,769,301 0 1,038,673 1,072,144 1,050,987 (21,157) On Target Complete Complete
Montgomerie Park (Both Phases) 46,322,381 5,072,415 46,322,381 0 352,208 364,518 393,273 28,755 On Target Significantly off target Ground remediation works commenced on site March 2024 with main contract scheduled
to commence towards the end of 2024.
Regeneration Project 1d 9,965,851 2,750 9,965,851 0 0 0 0 0 On Target Significantly off target Pre Site
Regeneration Project 1e 1,658,083 0 1,658,083 0 0 0 0 0 On Target On Target This relates to either Grange or Nursery Court - both of which should be on the appendix as
separate projects (as per the SHIP tracker).  Both have start dates of 01/04/26.
Springvale  2,852,016 2,749,677 2,749,677 (102,339) 0 0 3,682 3,682 On Target Complete Complete
Stanecastle Site 7,768,147 1,120,328 7,768,147 0 450,000 466,146 515,819 49,673 On Target Significantly off target Project commenced on site 25 March 2024.
St Beya Gardens 3,691,052 3,689,346 3,689,346 (1,706) 1,706 1,706 0 (1,706) On Target Complete Complete 
St Colm's Largs 4,907,987 4,808,429 4,907,987 0 12,685 12,685 (65,451) (78,136) On Target Complete Complete 
St Michael's Wynd 13,996,769 14,097,411 13,996,769 0 0 0 (390) (390) On Target Complete Complete 
Towerlands Primary School 8,579,943 8,574,482 8,579,943 0 9,279 9,279 3,817 (5,462) On Target Complete Complete
Unallocated Regeneration Block 8,304,876 0 8,304,876 0 0 0 0 On Target On Target Budget to be transferred to future years as not required for 2023/24.
Nelson Street Regeneration 622,116 4,470 622,116 0 50,000 50,168 4,470 (45,698) On Target Significantly off target Tender documentation being prepared.
Acquisition Of Land & Buildin 0 (113) 0 0 0 0 (113) (113) On Target On Target
House Building - General 1,547,765 0 1,547,765 0 0 0 0 On Target On Target
Acquisition Houses-Open Market 254,752 477,287 254,752 0 239,505 254,445 477,287 222,842 (0) 222,842 On Target On Target
Ukraine Buy Backs 0 2,458,498 2,458,498 (0)
Dickson Drive Phase 2 0 0 0 0 0 0 0 On Target On Target
Harbour Street 0 0 0 0 0 0 0 On Target On Target Options appraisal currently being carried out for the site due to projected costs being
significantly higher than previously projected.
Refurb - Connell Court 0 3 0 0 0 0 3 3 On Target Complete Complete
Kinnear Road 2,118 0 2,118 0 2,118 2,118 0 (2,118) On Target Complete Complete
Sy Mary's Primary, Largs 6,092,975 2,553,324 6,092,975 676,260 757,074 2,553,324 1,796,250 On Target On Target Works commenced on site 8 January 2024.
Contingency 11,000,624 0 11,000,624 0 78,322 0 649,126 (78,322) On Target On Target
Internal Management Charges 1,757,259 1 1,757,259 0 1,757,259 317,919 1 (317,919) (317,919) On Target On Target
SUB TOTAL 298,871,194 109,166,854 298,570,534 (300,659) 9,084,949 10,492,779 12,069,699 146,190 2,498,759 (921,840)
Improvements to existing stock
Wet Room - Void 426,386 306,928 306,928 (119,459) 426,386 437,928 306,928 (131,001) On Target On Target Reduction in estimated number of completions based on jobs received to date
Bathrooms - Void 770,876 568,698 568,698 (202,178) 770,876 792,262 568,698 (223,564) On Target On Target Reduction in estimated number of completions based on jobs received to date
Wet Room - Planned 150,025 162,000 162,000 11,975 150,025 150,025 162,000 11,975 On Target On Target
Bathrooms - Planned 341,561 357,517 357,517 0 334,699 354,236 357,517 3,281 On Target On Target
Electrical Rewiring 585,710 607,905 607,905 0 580,895 603,756 607,905 4,149 On Target On Target Anticipated slippage due to no access. 
Heating 2,924,745 2,268,166 2,268,166 (656,579) 2,721,825 2,807,121 2,268,166 (538,955) On Target On Target Scope of works less than budgeted for some properties and reduced numbers resulting in
an anticipated underspend.
Kitchens 1,581,530 1,537,384 1,537,384 0 1,458,554 1,516,369 1,537,384 21,015 On Target On Target Reduction in estimated number of completions due to no accesses.
Kitchens - Void 1,313,771 1,223,772 1,223,772 (89,999) 1,313,771 1,359,792 1,223,772 (136,020) On Target On Target Reduction in estimated number of completions due to no accesses.
Roofing 1,105,661 1,439,497 1,439,497 0 1,434,218 1,494,220 1,439,497 (54,724) On Target On Target
Wallfloor rendering 62,000 146,843 146,843 0 134,783 282,221 146,843 (135,378) On Target On Target Budget pulled forward to reflect additional addresses
EWI 4,473,962 4,316,792 4,316,792 (157,170) 4,473,962 4,499,674 4,316,792 (182,882) On Target On Target Overspend element due to an increase in anticipated unit rate
Window Replacement 541,903 440,674 440,674 0 376,925 393,497 440,674 47,177 On Target On Target Work being undertaken in relation to access arrangements. Housing will be reviewing this
in order to improve access.
Saltcoats MSF Investment 1,314,188 880,682 880,682 (433,506) 1,314,188 1,347,307 880,682 (146,190) (466,625) On Target On Target Projected expenditure includes buy-back houses, budget virement requested.
Smoke Detector Programme 250,000 259,060 259,060 9,060 250,000 259,742 259,060 (682) On Target On Target
Energy Efficiency 122,610 12,734 12,734 0 10,000 10,479 12,734 2,255 On Target On Target
Path Finder Project 250,000 0 0 0 10,000 10,000 0 (10,000) On Target On Target
Solar Panels 5,050,000 4,944,308 4,944,308 0 4,560,026 4,771,193 4,944,308 173,115 On Target On Target Recently surveyed houses not suitable. Sent out another batch but unlikely to complete by
year end
SUB TOTAL 21,264,928 19,472,959 19,472,959 (1,637,856) 20,321,133 21,089,822 19,472,959 (146,190) (587,323) (1,029,540)
DELIVERY STATUS
121

Page 122

TOTAL PROJECT CURRENT YEAR 2023/24 - Period 12
Project Description Total Project Budget            Cumulative Expenditure
to date Total Project Forecast                  Projected Over/
(Under) Spend               
Total Revised Budget
2023/24
Revised budget after
mgt fees adjustment
Actual Expenditure
to 31 March 2024 Virement Request
Carry /Brought
Forward to /From
2024/25
True Over/ (Under)
Spend
Delivery Status
Financial Delivery Status Physical Narrative
DELIVERY STATUS
Other Capital works
Estate Based Regeneration 2,093,064 621,889 2,093,064 0 740,089 767,158 621,889 (145,269) On Target On Target Skelmorlie parking costs lower than expected.
Lift Replacement 454,425 0 454,425 0 0 0 0 On Target On Target Slippage on programme . No returns when tendered. Works now expected to commence
late summer.
Sheltered Housing Units 12,965,531 5,091,024 12,965,531 0 4,633,521 4,825,489 5,091,024 265,535 On Target On Target Budget pulled forward due to an accleration of works
High Flats Demolition 2,368,970 1,703,270 1,725,818 (643,152) 2,368,970 2,433,023 1,703,270 (729,753) On Target On Target Final Account has now been agreed
Health and Safety Works 207,000 0 0 (207,000) 207,000 207,000 0 (207,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Parkhall & Kirkhall Asbestos 17,358 0 0 (17,358) 17,358 17,358 0 (17,358) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Major Improvements 6,000 0 0 (6,000) 6,000 6,000 0 (6,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Newhouse Drive (Regen 1b) 5,000 0 0 (5,000) 5,000 5,000 0 (5,000) On Target On Target Carried forward from 2022/23. Not required for 2023/24.
Maress House Refurb (12,540) 0 (12,540) 0 (12,540) (12,540) 0 12,540 On Target On Target
Other Capital works 0 0 0
Kilbirnie Housing Office 254 6,749 6,495 Complete Complete
SUB TOTAL 18,104,808 7,416,184 17,226,298 (878,510) 7,965,398 8,248,742 7,422,933 0 120,266 (946,076)
Total Expenditure 316,976,002 116,583,038 315,796,832 (1,179,169) 37,371,480 39,831,343 38,965,590 0 2,031,702 (2,897,455)
Income
Affordable Housing Contributn (2,444,930) (2,444,930) (1,105,510) 1,339,420
CFCR (5,151,045) (5,191,128) (5,191,128) 0
Capital Grants (6,785,747) (8,712,947) (7,422,606) 1,290,341
Prudential Borrowing (18,925,091) (19,413,644) (25,242,319) (8,726,129) 2,897,455
Council HB fund contribution (4,064,667) (4,064,667) 0 4,064,667
Sale of Assets (4,027) (4,027) (0)
Other Capital Income 0 0 0
SUB TOTAL (37,371,480) (39,831,343) (38,965,590) 0 (2,031,701) 2,897,455
Total Project Expenditure 316,976,002 116,583,038 315,796,832 (1,179,169) 37,371,480 39,831,343 38,965,590 0 2,031,702 (2,897,455)
Total Project Income (37,371,480) (39,831,343) (38,965,590) 0 (2,031,701) 2,897,455
Total Net Expenditure 0 0 0 0 0 0
122

Page 123

NORTH AYRSHIRE COUNCIL 
6 June 2024 
Cabinet 
Title:    Children’s Services Performance Update 2023-24 
Purpose:  To seek approval for: 
a) The North Ayrshire Children’s Services Performance Update
2023-24 
Recommendation:  That Cabinet: 
a) Approves the North Ayrshire Children’s Services Performance
Update Report 2023-24. 
1. Executive Summary
1.1 1.1
1.1 Every Local Authority and relevant Health Board are required to jointly prepare a
Children's Services Plan for the area of the local authority for each three-year period.
Plans are developed collaboratively with other members of the Community Planning
Partnership (CPP), as well as with children, young people and their families at various
stages of the development and review of the Plan. We published our Children’s Services
Plan 2023-26 in June 2023. 
1.2 Our North Ayrshire Children’s Services Plan 2023-36 is part of a suite of child focussed
plans which outline how we are actively supporting the wellbeing and wellness of our
children and young people, as well as promoting and advocating for the rights of our
children and young people. 
1.3 Our Children’s Services Plan Performance Update Report 2023-24 is prepared in
collaboration with the Children’s Services Strategic Partnership (CSSP) which consists
of representatives from our Community Planning Partners.   We have a duty under the
Children and Young People (Scotland) Act 2014 to produce a Children’s Services Plan
Performance report at the end of each year.   
1.4 Our Children’s Services Plan Performance Update Report 2023-24 highlights some of
the key achievements and areas of work which impact on Children, Young People and
their families during the first year of our new Children’s Services Plan.   
2. Background 
2.1 Part 3 of the Children and Young People (Scotland) Act 2014 seeks to improve
outcomes for all children and young people in Scotland by ensuring that local planning
Agenda Item 10
123

Page 124

and delivery of services is integrated, focused on securing quality and value through
preventative approaches, and dedicated to safeguarding, supporting and promoting
child wellbeing. It aims to ensure that any action to meet need is taken at the earliest
appropriate time and that, where appropriate, this is taken to prevent need arising. The
aims are about creating and maintaining a local environment which facilitates Getting it
Right for Every Child Practice (GIRFEC) for individual children and young people. 
2.2 Section 13 (1) of the Act requires that as soon as practicable after the end of each one-
year period, a local authority and the relevant health board must publish (in such
manner as they consider appropriate) a report on the extent to which: 
a. children’s and related services have, in that one-year period, been provided in
accordance with the Children’s Services Plan; and
b. that the provision of services has achieved –
i. the aims of children’s services planning (section 9(2)), and
ii. such outcomes in relation to the wellbeing of children in the area as the
Scottish Ministers may by order prescribe. 
2.3 The “one-year period” runs from 1 April to 31 March. Each Children’s Services Plan
must be prepared in relation to a specific “three-year period”, so over the course of a
Children’s Services Plan there will be three annual reports. 
2.4 Our 2023-26 Children’s Services Plan continued our vision 'For all our children and
young people to have the best start in life and for North Ayrshire to be the best place in
Scotland to grow up'. The Performance Update Report 2023-24 has been structured in
line with our five priorities set out in the Plan. These are – 
1. The rights of children and young people are promoted and protected.
2. Acting early to improve what happens next.
3.  Making Things Fairer
4.  Promoting good mental health and wellbeing
5.  Inspiring children and young people to be active 
2.5 A suite of actions were identified to be delivered by CPP partners. Updates on the
progress of the actions has been included in Appendix 1 of the report. We have
established an initial set of indicators to measure progress, as attached in Appendix 2
of the report. 
2.6 At the end of April 2024, the Scottish Government provided feedback on our 2023-26
Children’s Services Plan. Feedback is intended to support us to consider areas of
strength and areas for development. Overall, feedback concluded that the Plan is
comprehensive, ambitious and informative. It is well linked to other local and national
plans and frameworks, including the National Performance Framework, GIRFEC and
Child Poverty Action Plan. Strategic priorities and actions are clear, and there is clear
evidence that children, young people and families have contributed to the development
of the plan.   
2.7 Areas for development were to provide information about monitoring and evaluation of
progress, including a set of specific and measurable progress indicators linked to each
priority. Partners have identified a set of relevant measures which are included as
Appendix 2 to the report. These are intended to act as a baseline and will be reviewed
and updated regularly to assist with improvement activity. 
124

Page 125

2.8 A summary version of the report will be produced over the summer months to ensure it
is fully accessible and engaging for our young people. 
2.9 Some of our key highlights from the 2023-24 Performance Update report include: 
• Community Learning and Development (CLD) hosted two strategic forums - the Joint
Cabinet and Joint Youth Forum.  Young people actively participated in shaping the
CLD Strategic Plan, providing valuable input into the future direction of community
learning and development initiatives. 
• On the 8th December 2023, we held our second ‘Promise’ Conference with over 130
delegates including 40 Care Experienced young people. We created and launched
Scotland's very first Care Experienced app. 
• We have employed a Welfare Rights Officer to engage directly with families following
referral from education staff. Over the course of the 2022-23 school year, this has
resulted in financial gains of over £572,000 for families who need it most.
• The Integrated Early Years Team empower and enable parents and carers to support
their child in a range of areas. During 2023-24, 965 Requests for Assistance were
received. Requests included supporting parents with topics such as communication,
behaviour, sleep, weaning, community integration, parental mental health, relationship
issues and home conditions.  
• 90 group based physical activity and health education sessions were delivered by the
Child Healthy Weight Team in addition to attendance at 12 promotional events.
Partnership working with the Trinity Active Travel hub continues, supporting events
and initiatives aimed at promoting active lifestyles and healthy habits. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Approves the North Ayrshire Children’s Services Plan Performance Update 2023-
24 and;
b) Agrees that the report can be submitted to the Scottish Government and published
on the Community Planning Partnership website by the end of June 2024. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications for North Ayrshire Council contained within the
current report. 
Human Resources 
4.2 There are no HR implications for North Ayrshire Council contained within the current
report.  
125

Page 126

Legal 
4.3 We have a duty under the Children and Young People (Scotland) Act 2014 to produce
a Children’s Services Plan Performance report every year detailing the activities
undertaken in relation to Children’s Services. 
Equality/Socio-economic 
4.4 Recognising and advocating the rights of our children and young people directly
contributes to ensuring equality and equity of opportunity in North Ayrshire.   
Climate Change and Carbon 
4.5 There are no Climate Change and Carbon implications. 
Key Priorities 
4.6 This report directly supports our Council’s vision of creating ‘a North Ayrshire that is Fair
for All’ and our mission of ‘Working together to improve the lives our people in North
Ayrshire’. It demonstrates how we are contributing all of our priorities ‘Wellbeing’,
‘Communities and Local Democracy’, ‘Climate Change’ and ‘A Sustainable Council’ in
ensuring children’s rights are embedded throughout our services. 
This report directly supports the Health and Social Care Partnership Strategic Plan and
vision to ensure that ‘People who live in North Ayrshire are able to have a safe, healthy
and active life’. 
This report directly supports the North Ayrshire Community Planning Partnership Plan
and three key themes of ‘Wellbeing’, ‘Work’ and ‘World’. 
Community Wealth Building 
4.7 There are no Community Wealth Building implications for North Ayrshire Council
contained within the current report. 
5. Consultation 
5.1 Contributions from services across our Council and Partners have been included in this
report. Services regularly consult with children, young people and families. A Young
Person’s version of the report will be developed over the summer months to ensure it is
fully accessible for our young people.  The Annual Report will also be presented to the
Children's Services Strategic Partnership, the Integration Joint Board and NHS Ayrshire
and Arran. 
Caroline Cameron
Director (North Ayrshire Health and Social Care Partnership) 
For further information please contact Lauren McMath, Policy Officer (Children’s
Services), (Health and Social Care Partnership), on 01294 324160,
laurenmcmath@north-ayrshire.gov.uk. 
126

Page 127

Background Papers
Appendix 1: North Ayrshire Children’s Services Performance Update 2023-24
127

Page 128

NORTHAYRSHIRECOUNCILCHILDREN’SSERVICESPLAN|A
Introduction North Ayrshire
Children’s Services Plan Performance
Update 2023-24
128

Page 129

2 
Contents
Introduction / Foreword .................................................................................................................... 3
Priority 1: The rights of children and young people are promoted and protected ........... 4
Priority 2: Acting early to improve what happens next ............................................................ 9
Priority 3: Making things fairer ..................................................................................................... 20
Priority 4: Promoting good mental health and wellbeing ...................................................... 27
Priority 5: Inspiring children and young people to be active ............................................... 33 
129

Page 130

3 
Introduction / Foreword 
Welcome to our Children’s Services Plan Progress Report 2023-24 which highlights our progress
and activities over the past 12 months. 
This is our first performance update for our new Children’s Services Plan 2023-26. In our plan we
set out our collective vision as a Community Planning Partnership for North Ayrshire to be the best
place in Scotland to grow up. We continue our focus on promoting children and young people’s
wellbeing, underpinned by Getting it Right for Every Child (GIRFEC). 
Our Children’s Services Plan is part of a suite of plans which outline how we are actively supporting
the wellbeing and wellness of our children and young people. These include our Child Poverty
Action Plan, Children’s Rights Report, Corporate Parenting Plan, The Promise implementation, and
our Child Protection Plans, all of which are at the centre of everything we do to support and nurture
children and young people. Our Childrens Services Strategic Partnership (CSSP) leads on the
development of these plans and consists of key representatives from across our Community
Planning Partners. 
Central to our planning is ensuring children and young people’s voices are heard and their rights are
respected. 
Our performance report is split up into five sections, relating to our five key priorities – 
• The rights of children and young people are promoted and protected
• Acting early to improve what happens next 
• Making things fairer
• Promoting good mental health and wellbeing 
• Inspiring children and young people to be active 
Appendix 1 contains updates against all of the actions set out in the 2023-26 Plan. 
Appendix 2 contains a baseline of Performance Measures supporting our monitoring of the Plan. 
A Children and Young People friendly summary of this report will developed over the summer. 
Caroline Cameron 
Director of Health and Social Care Partnership 
We hope you find this report informative. If you would like to contact us about anything related to
this report, please contact Lauren McMath – laurenmcmath@north-ayrshire.gov.uk 
130

Page 131

4 
Priority 1: The rights of children and young people are
promoted and protected 
Key Highlights and Case Studies 
Childrens Rights 
We continue to champion the United Nations Convention on the Rights of the Child (UNCRC),
ensuring that all children in North Ayrshire have their rights met, protected and advocated for.  We
have further embedded our Equality and Children’s Rights Impact Assessment (ECRIA) and this has
been carried out on all new policies that affect the lives of our children and young people. In
December 2023, it was agreed that the Council would treat “care experienced” as a protected
characteristic for the purposes of Equality Impact Assessments (EIA). 
Preparation continues to involve children and young people in the planning process for actions that
affect them (related to Article 12 UNCRC). Further work has been undertaken to encourage this
process including Nurture Bricks and Pupil Voice Templates (PVT) which are used in schools to
gain an insight into how effectively we meet Additional Support Needs (ASN). 
We continue to place human rights and the needs of every child and young person at the centre of
all that we do. A new Learner Participation Strategy has been introduced involving schools and
early years settings, clusters and local authority officers. Staff have participated in collaborative
sessions to ensure that the new strategy is “fit for purpose”. The Learner Participation Strategy will
be further developed in session 2023-24 through the co-creation and co-design of a young person
friendly version with learners. The strategy and follow up action plan will be monitored and
reviewed. 
Rights Respecting Schools (RRS) 
Considerable progress has been made across the Rights Respecting Schools programme (RRS).
This programme has been promoted and introduced into almost all of our schools. The Rights
Respecting Schools Award recognises achievement in putting UNCRC at the heart of a school’s
planning, policies, practice and ethos. Children’s rights underpin the Getting it Right for Every Child
approach. Over 90% of our schools have achieved or are working towards RRS status, which is
divided into bronze, silver and gold levels.  RRS Gold Award is the highest level of the award and is
granted to schools that have fully embedded the principles of the UNCRC into their ethos and
curriculum. The accreditation is valid for a period of three years. The following North Ayrshire
schools have achieved Gold status: 
Ardeer Primary School; Beith Primary School; Dykesmains Primary School; Glencairn Primary
School; Stanley Primary School; St Bridget’s Primary School; St Luke’s Primary School; St Mary’s
Primary School; St Matthew’s Academy; Whitehirst Park Primary School. 
The remainder of schools engaging with RRS awards are at Bronze level, working towards silver or
working to maintain their Silver status. Rights education and the Rights Respecting Schools
approach remain areas of success and strength. The RRS approach is evident in all schools with
success being shared through their social media platforms and via attractive school and classroom
displays. 
Focus groups of children reveal that they are knowledgeable about their own and others’ rights.
Increasingly children and young people are taking on elements of responsibility and participation
ensuring that all schools listen and involve pupils fully in decisions that affect them and their school
131

Page 132

5 
community. A focus on inclusion and equality by our schools and centres ensures increasing
opportunities are provided for those with protected characteristics. 
Supporting needs 
Following a collaborative review of the processes involved in supporting needs, specific areas were
targeted for redesign. Our Staged Intervention policy for identifying and planning for children and
young people with additional needs was redesigned and simplified. This focuses on three elements
of support: Enhanced Universal, Stage 1 and Stage 2. The policy includes detailed descriptors
around each element which clarify the level of need and how these can be best supported.
Streamlined approaches to short, medium and long term planning are in place along with clear
guidance on how meetings with young people and their families are recorded to ensure we fully
comply with legislation. 
Processes for accessing supports such as the Outreach Support Service (Extended Outreach and
Tuition Support), Early Years Inclusion Support Service (EYIST) and Accessibility Strategy have
been streamlined to enable a service which is learner centred with clear routes to referral.
Accessing these services can be time-critical and so the referral pathways have been improved. 
At all stages, collaboration and co-creation have been crucial with evaluation ongoing. Leaders from
all sectors and at all levels have been involved with the evaluations demonstrating the effectiveness
of the approach in ensuring all voices are heard, policies are co-designed and there is a clear sense
of joint ownership. 
Following successful pilot projects running in Greenwood Academy and Irvine Royal Academy in
2021-22, Secondary Support Resources were established in all 9 secondary schools. This
enhanced support resource is available to learners across all secondary schools and offers an
environment which supports personalised learning for young people who have a range of support
needs and require ongoing enhanced transition. This is not specialist provision, instead is a way of
offering targeted support to those who require it to support their mainstream school experience. 
Data and impact reports were compiled and showed that, in this first full year, over 300 learners
were supported to attend their mainstream secondary provision. Data demonstrates that there were
significant impacts in the areas of attendance, engagement, motivation and positive attitudes to
school and self. 
Links with educational psychologists and the mental health and wellbeing team have ensured that
staff are well-trained and feel confident in the impact they are making on the lives of the young
people they support. Evaluations from our people and their families demonstrate the high regard in
which the support is held. 
Youth Work 
We held a celebration of Youth Work Week, emphasising the importance of youth work in the
community. Events and activities during Youth Work Week aimed to raise awareness about the
significance of youth work in supporting young people's personal and social development.   
Community Learning and Development (CLD) hosted two strategic forums - the Joint Cabinet and
Joint Youth Forum.  Young people actively participated in shaping the CLD Strategic Plan, providing
valuable input into the future direction of community learning and development initiatives. 
Ongoing support is provided for Members of the Scottish Youth Parliament (MSYP), indicating a
commitment to amplifying youth voices at the national level. We have active engagement with pupil
councils and parliaments to empower young people in decision-making processes at a school
132

Page 133

6 
level. We have focused on engaging with ambassadors for mental health and climate change,
addressing critical issues relevant to the well-being of young people and the environment. 
We successfully re-established the Executive Youth Council, demonstrating a renewed commitment
to youth governance and leadership. Campaigning and voting for the next Scottish Youth
Parliament candidates saw significant participation. An error in the national Young Scot system led
to a rescheduling of the voting process through paper ballots in January 2024 and we saw over
1,000 votes cast by our young people using these. 
Young people aged 8-25 actively participated in co-designing and reviewing this year’s participatory
budgeting process, showcasing a commitment to inclusivity and empowering young people in
decision-making. Over 105 projects across North Ayrshire were subject to participatory
budgeting, providing a platform for young people to shape the allocation of resources for community
initiatives. 
A rights-based approach is applied to all youth work provisions. We collected data from over 200
young people regarding powers that could be added or used to facilitate youth decision-making. The
survey also explored types of support needed for young people to build their capacity in the
community and how to ensure inclusivity in decision-making processes. 
During LGBT History Month, various school and community-based programmes and events were
held. Ten young people from the Garnock Valley Umbrella Group have been engaged in
discussions and workshops to create a Trans Resource for young Trans people. 
The young parents group was launched with 15 young parents regularly engaging in weekly
activities. 
KA Leisure has engaged with our Youth Services to explore a range of options to better engage
young people in the decision-making for leisure and sport provision.  A new Youth Forum will be
established in 2024 which will encourage young people across our communities to share their
views.  
133

Page 134

7 
Case Study - Kindness Murals 
Garnock Valley Dalry Community Gardens 
Working with the Bee You Ambassadors group, the Mental Health
Project Delivery Officer had many discussions around what issues
young people faced in their local communities and how they could use
their mental health training to benefit these young people.  Through
these discussions it was recognised that some work around suicide
prevention should be prioritised.  The young people felt a project
highlighting positive mental health messages that would also give young
people local signposting/ support services would support their peers in a
proactive way. 
Following on from the Kindness Mural Consultation across the Garnock
Valley, the Project Delivery Officer developed the mural initiative, co
designed and produced with input from young Bee You Ambassadors,
Community Partners and Locality Staff.  Working with Garnock Valley
Youth Forum, supporting group meeting and facilitating session around
the creation of the Mural in the Garnock Valley, the young people
collaborated with a local graffiti artist and volunteers from Dalry
Community Gardens. This was the first draft of the design was created
by the artist and young people. 
The young people and Graffiti Artist would work on creating this design in November 2023 with the reveal
and open day in December 2023.  The vibrant and eye-catching mural is located at the community garden
where young people can not only see the message of positivity but provided links through QR codes to
support services and mental health and wellbeing mapping for young people. Bee You Ambassador Finley
said: “We were all really passionate about building a lasting legacy for young people in North Ayrshire.
The reason for this is because we understand that mental health and the stark rise of young people
impacted by suicide are both serious issues having a real, detrimental impact on the wellbeing of local
young people today. So, over the last few months we have been speaking directly to our peers in both
classroom and youth settings to hear more about their lived-
experiences. This has given us an understanding of what is
working well and if they need it, we’ve shared what support is
out there locally. One key theme we have identified through
this work is that there’s so many young people out there who
are unsure about where they can turn to outside of school.”
Provost Anthea Dickson unveiled the new mural at the official
opening ceremony. She said: “Although the consultation stage
has been several months in the making, the painting of the
mural itself only started out on Monday last week, and what a
transformation! I would like to thank all of the dedicated young
people who came up with the mural design and to local graffiti
artist extraordinaire Tragic O’Hara who has worked together
with them on this striking modern mural for Dalry.
Congratulations to everyone involved. You should all be really
proud of yourselves.”
134

Page 135

8 
Advocacy
North Ayrshire Health and Social Care Partnership is committed to ensuring people have their
voices heard, are able to express their needs, make informed decisions and have their rights and
interests protected. Our new Advocacy Strategy will take us from 2022 to 2029 and has been
influenced by a number of policy drivers. 
We work closely with our national and local partners as we help to deliver ‘The Promise’ for
Children, Young People and Families. The promise is responsible for driving the work of change
demanded by the findings of the Independent Care Review. Made on 5th February 2020, the
Promise seeks to improve the experience of all children, young people and their families if they
require additional support. The Promise aims to create a more compassionate care service for
families and young people. This includes five key foundations that all change must be delivered
against. Among these is the foundation of ‘Voice’, in which all children must be listened to and
respected and appropriately involved in decisions about their care. Specifically referencing
advocacy, 'All care experienced children and their families will have access to independent
advocacy at all stages of their experience of care.’ 'Care experienced children and young people will
be able to easily access child centred legal advice and representation’. Advocacy provision will
follow the principles set out in the promise. 
Barnardo’s Hear 4 U is an independent advocacy service based in Kilwinning and operational
across North Ayrshire. The service provides community-based advocacy to children and young
people ensuring that they are aware of their rights as defined within the United Nations Convention
on the Rights of the Child (UNCRC). Priority is given to children and young people who: 
• Are involved in the child protection process and/or children’s hearing system. 
• Are Care Experienced in Foster Care, Residential Care and/or Kinship Care. 
• Are on the periphery of Secure Care 
• Were previously looked after and accommodated 
• Have additional support needs 
The feedback from children and young people using the services shows: 
• They are more able to report safety concerns/complaints safer/at reduced risk. 
• They feel more able to contribute to planning/decision making; and 
• There is improvement in how their views are voiced and acted upon. 
135

Page 136

9 
Priority 2: Acting early to improve what happens next 
Key Highlights and Case Studies 
Child Protection 
We have set up a multiagency Implementation Group for the new National Guidance for Child
Protection, with all core partners represented - Health, Police Scotland, Education, Social Work
Services, SCRA.  A series of briefings were developed on the new guidance to assist staff to be
prepared on the changes, e.g. Child Protection registration changes and changes to Initial Referral
Discussion (IRD). These were designed to assist frontline staff to be prepared and informed of the
new expectations. 
Feedback from Pan Ayrshire services was very positive about how helpful the briefings were in
preparing the workforce. The guidance was implemented in September 2023 within the specified
timeframe. The ongoing impact of the new guidance e.g. length of registration, inclusion of non-
familial harm and numbers of IRD will require close monitoring via the Child Protection Committee to
ensure all services work together effectively to keep children and young people safe. 
Practice Reflective Improvement (PRI) Dialogue sessions encourage greater levels of reflection on
cases with an element of child protection. North Ayrshire Child Protection Committee and North
Ayrshire Health & Social Care Partnership continue to accept referrals for Practice Reflective
Improvement Dialogue sessions. PRI Dialogue has been in place for over two years now and
feedback from both participants and facilitators is showing the value of these sessions: 
“It is really helpful to hear reflections from different perspectives – it makes it easier to understand
the context of decision making and broadens ideas extrapolated from reflection” (Participant) 
“It (PRI) validated the great work being done and the care and love practitioners have for their jobs
and the children and families they work with. It showed that everyone believes in aiming for the best
outcomes for young people. It also gave people permission to evaluate their own practice and talk
about it openly. The difference it made was, there were no judgements made on the choices taken.
It allowed people to see the different ways services work and raised the levels of mutual respect for
the work we all do.” 
Early Years 
The percentage of pre-school children achieving their early learning milestones by the time they
start primary school has once again increased to 81% in 2022-23 academic year.  This is the best
performance recorded since the measure was introduced, with improvements made in all aspects of
the early learning milestones including literacy, numeracy and health and wellbeing. 
We continue to offer all families support from a multi-disciplinary, integrated Universal Early Years
(UEY) service.  All children in North Ayrshire have access to the full Universal Health Visiting
Pathway which consists of a minimum of 11 Health Visitor visits from the ante-natal period to the
pre-school assessment when a child is 4 years old. 
For younger parents, under the age of 21 years, they can opt-in to the Family Nurse Partnership
(FNP) programme which provides more intensive and targeted support.  The multi-disciplinary team
consists of Health Visitors, Family Nurses, Early Years Social Workers, Health Visiting Support
Workers, Family Nurturers, Perinatal Mental Health Nurses, Community Infant Feeding Nurses, and,
during 2023-24 has been expanded to include a dedicated Dads’ worker in partnership with national
charity Dads Rock.  965 families have been supported by the team during this last year.  In addition,
136

Page 137

10 
the wider team of support across the NHS, local authority and third sector organisations including
services such as Speech and Language Therapy, Occupational Therapy and Paediatrics received
980 Requests for Assistance for children under the age of 5 years old in the last 12 months.  In
total, 1,945 children and their families have received additional support from a range of early years’
services. 
The service also receives notifications from services such as Police Scotland, NHS 24, NHS
Ayrshire and Arran Emergency Department, housing (homelessness), North Ayrshire Drug and
Alcohol Recovery Service (NADARS) and Paediatrics/ Paediatric in-patients where information
pertaining to a child requires to be shared.  During 2023-24, 2,436 notifications were received from
these agencies/ services and were shared with Health Visitors and Family Nurses to support a
holistic assessment of a child’s needs. 
NHS Ayrshire & Arran continued to work in partnership with the Breastfeeding Network to provide
mother to mother peer support to breastfeeding mothers. Between April and October 2023, the
service was offered to all first-time mothers who were breastfeeding on discharge from Ayrshire
Maternity Unit. Up to September 2023, across Ayrshire, 85% of mothers took up the offer of peer
support; 35% of those mothers were from North Ayrshire. At 6-8 weeks 48% of the mothers who
took up peer support from North Ayrshire were exclusively breastfeeding their baby, while 26% of
mothers were giving a mix of infant formula and breastmilk. In November 2023, the service
expanded to offer peer support to all breastfeeding mothers. 
Speech and Language 
Data collected at the end of March 2024 confirms there were 86 children on our waiting list with an
average waiting time of 79 weeks. It is projected that at the end of April 2024 there will be 82
children waiting with an average wait of 26 weeks. 
We know that for many children the most effective way to support their development is by
empowering the people who are communicating with them on a daily basis at home or in their
school or nursery. Therefore an essential part of our support for families and other professionals is
provided via the helpline support and also drop-in appointments when our Speech and Language
Therapists provide advice and resources to support parents and staff working with the children
depending on the child’s needs. 
These supports include linking with the communication champion in nursery or teacher in school,
adapting the environment in nursery or school using a communication friendly approach, making
sure the team around the child know how best to help them, providing families with links to helpful
resources as well as topic specific webinars and drop-in appointments. Children are therefore only
added to our waiting list when there is a difficulty that requires a Speech and Language Therapy
assessment.  We make sure we provide ongoing support for families and staff while children are on
the waiting list by encouraging them to continue to access support using the drop-in clinics or
helpline. 
Over the course of 2022-23 the service experienced financial restrictions and budgetary
vulnerability along with recruitment challenges which meant population needs, particularly the
number of children waiting for individualised interventions, posed unprecedented challenges. The
service consequently could not deliver timely, evidence based, individualised interventions nor could
it effectively address the speech, language and communication needs of the wider population. 
These challenges have now been addressed and the service is now financially stable and fully
staffed. The focus of our recent improvement work has therefore been to improve our systems to
support efficient flow from assessment to therapy and our communication with families regarding
waiting times to help manage their expectations and encourage them to engage in the wider
137

Page 138

11 
supports available to them. Waiting time information suggests this work along with staffing and
financial stability is helping to reduce the number of children waiting and the length of wait. 
Parental Programmes 
The Mental Health and Wellbeing Project Delivery Officers have provided support to parents
through Take Time families programme and Bee You family sessions. The nationally accredited Your
Resilience programme provided young people with the skills to increase their emotional resilience
and provided toolkits and methods to enable them to safeguard their wellbeing. The establishment
and support to our equality forum ensures that our LGBT+ community are heard, participating in
youth work opportunities and increasing their wellbeing while supporting peers who are like minded
and facing the same issues. 
Developing a range of initiatives, interventions, and programmes to increase opportunities to
enhance family engagement in learning continues to be the focus of our Family Learning Team. The
Team has worked closely with schools and families to devise and develop family learning
opportunities which meet the needs of parents and families. 
In school session 2022-23 a total of 2,566 families engaged in Family Learning opportunities offered
in schools and within the local community. Throughout this year Family Learning opportunities were
delivered across 39 primary schools and 6 secondary schools. The programmes delivered by the
Family Learning Team can be split into four key areas – Curriculum, Transition, Health & Wellbeing,
and Learning Opportunities for Parents/ Carers. Through individual school requests the team has
delivered 19 different interventions during 2022-23. 
Bereavement support is young person centred and individually assessed case by case. In depth
work has taken place with young carers with the programme being shaped by the young people with
issues faced by themselves and their peers. 
Care Experienced Children and Young People 
The Promise is a large-scale, complex, 10-year change programme with multiple objectives across
multiple partners. For North Ayrshire to realise the asks of The Promise, all our partners need to be
clear on respective roles and responsibilities as a foundation for future development. Building this
foundation alongside our key partners and strengthening the scaffolding around the change
programme has been the major focus for North Ayrshire in the last three years. 
The COVID-19 pandemic had impacted our ability to progress our ambitions as originally planned.
There were reduced opportunities to work alongside children and young people. Despite this, we
have included them when it was safe to do so, and our partners have remained strongly committed
to progressing The Promise and have sought out creative and innovative ways to overcome some
of the challenges presented by the pandemic. 
The support that young people and families need to ensure they prosper and thrive is identified by
The Promise as Scaffolding and is one of The Promise’s Foundation Principles. 
We have accomplished the following: 
• Engaged with our Champions Board and other young people and involved them in
discussions
• Employed a full time Participation and Engagement Lead 
• Employed a full time Corporate Parenting Youth Worker 
• Appointed a Participation Assistant 
138

Page 139

12 
• Agreed the Governance arrangements to ensure partnership approach and accountability
internally and with our partners. 
• Developed a Promise Operational Group (PrOG) and sub-groups to drive priorities. 
The Steering Group and Promise Operational Group (PrOG) have been established to ensure
consistency and involvement across the Partnership at a strategic and operational level. The
Promise Operational Group is attended by operational staff. There are four PrOG sub-groups: 
1. Communication and Language 
2. Alternative Care 
3. Relationships 
4. Data Mapping 
Prior to and upon the publication of The Promise, we have made considerable progress in
improving outcomes for care experienced children and young people and their families. We are
confident that: 
• The Getting it Right for Every Child (GIRFEC) principles and values are embedded in all that
we do; our workforce recognises our children and young people are the most important
people in our communities. 
• Partnership working is embedded in our operational and strategic efforts through our
Corporate Parenting Steering Group. This is not just across the Corporate Partnership but
also in partnership with young people through our Champions Board and care experienced
networks. 
We have strong partnership working across all public services, including Community Planning
Partners and third sector. Our partnership strengths have resulted in – 
• A focus on prevention and early intervention programmes.
• Co locating the workforce from different disciplines to reduce silo working. 
• Listening and responding to children, young people, carers and parents at a pace that is
right for them. 
The Promise Conference 
On 4th November 2022 North Ayrshire Community Planning Partnership held their first Promise
Conference with over 130 delegates from across a range of Community Planning Partners,
Government officials, Carers and Care Experienced Young People. Of the 130 delegates, 23 were
carers and care experienced young people. The conference was facilitated by two care experienced
young people who chaired throughout the day. 
On the 8th December 2023, we held their second ‘Promise’ Conference with over 130 delegates
from across a range of Community Planning Partners and Care Experienced Young People. Of the
130 delegates, 40 were Care Experienced young people. The conference was facilitated by the
Corporate Parenting Manager for the North Ayrshire Partnership and a Care Experienced young
person. The conference’s aim was to bring together staff and front-line managers who engage with
Care Experienced children and young people as part of their work, allowing them to meet one
another and to learn about and discuss issues, ideas and work that focus on Care Experience. The
expected outcome of this conference was that delegates, having made connections that will enable
them to collectively and individually support the Care Experienced community to reach their
potential, and leave the conference feeling inspired, motivated, and empowered with knowledge and
solutions. The Conference was solution focused, addressing the three themes from the Promise
Oversight Board Report 2 (June 2023) of Education (in its broadest sense to include skills, hobbies,
learning and qualifications), Moving On (including transitions at other times), and Brothers and
139

Page 140

13 
Sisters. An additional theme of ‘Working Together’ with the Care Experienced Community was
discussed. 
Discussion around the themes took place at tables with reflective activities, main discussion points
and case studies. The Corporate Parenting Team are creating a report to summarise young
people’s views from the day. This will be shared after consultation with our young people. The next
conference will be co-designed with our school’s Care Experienced Youth Groups. 
Care Experienced App 
Our North Ayrshire Champions Board have created and launched a Care Experienced App named
"CE4U". The app has lots of tips, advice, and information that we believe will help Care Experienced
young people throughout their journey and beyond. The app has a little bit about everything from
housing support, learning how to cook using recipes, tips on how to look after yourself physically
and mentally, travel support as well as key contacts and events happening in our area. North
Ayrshire Champions Board used their own experiences and journeys to produce the idea for an app
as they often found they didn't know a lot of the information that was out there or they simply didn't
know who or what to ask to find it for them, and so Scotland's very first Care Experienced app was
created. 
Signs of Safety Model 
Health and Social Care have begun the implementation of the ‘Signs of Safety’ assessment and
planning model. This model places parents, children and everyone naturally connected to the child
at the centre of the assessment, decision-making and planning. 
The Signs of Safety practice principles support our vision that the best place for children and young
people to grow up is within their families and networks where they have the potential to care for
them safely. When this is not possible, we will provide a secure, stable home, and help them
achieve their full potential. We continue to be committed to giving families every opportunity to come
up with and apply their own solutions. 
We went fully live with Signs of Safety for all new cases in September 2023 for Children and
Families Locality teams and the Child Protection team. Prior to then we had a period from June
where we used the approach with a small amount of practice in order to build workforce confidence
and knowledge. Since then, we have utilised this practice framework with over 250 children and
young people. 
We will be establishing an internal implementation steering group to monitor and drive progress. We
are moving into our second year of a 5-year implementation plan to fully embed the model in
practice. Over the next year we will transition all work with families over to a Signs of Safety model
approach.  Social Work Children and Families Teams will be working to ensure this support model is
implemented for all children and young people receiving a service. 
Partner agency briefings have continued and been provided to Children’s Hearing Scotland, SCRA
staff, education colleagues, NHS colleagues, Police Scotland, and other third sector partner
members. More than 25 partner briefing sessions have now been offered, with a mixture of face to
face and online sessions, and approximately 450 multi-agency partners have received this input and
have developed understanding of the aims and benefits of the practice model. 
Safe and Together Model 
Based on domestic abuse research, the Safe and Together Model has been implemented. The
model is key to realising the Pan Ayrshire vision and directs us to reframe domestic abuse “as a
parenting choice”, and it shifts assessments towards a “perpetrator pattern-based” approach as
140

Page 141

14 
opposed to solely focusing on incidents, which is crucial in the assessment of risk to a child and
their non-abusing parent. The model provides a suite of assessment tools and enables practitioners
to challenge and address the gender-based nature of domestic abuse through the following model
principles: 
• Keeping the child safe and together with the non-abusing parent. This is usually the most
effective way to promote children's safety, healing from trauma, stability and nurturance.
• Partnering with the non-abusing parent in a strengths-based way. This approach is likely to
be the most efficient and child centred way of assessing risk through mutual information
sharing.
• Intervening with the offending parent to reduce risk and harm to the child. 
Engaging and holding them accountable in a variety of ways, including connecting them to their
parenting role, reduces the risks to children. We have a variety of multiagency trainers accredited to
deliver the Safe and Together training, in partnership with Women’s Aid as our third sector partners
who also work to ensure the voices of those with lived experience are included. 
The Multi-Agency Risk Assessment Conference (MARAC) 
The MARAC model has been launched in August 2022 and continues to operate on a monthly
basis. MARAC is a local meeting where representatives from statutory and non-statutory agencies
meet to discuss individuals at high risk of serious harm or murder as a result of domestic abuse.
The meeting provides a safe environment for agencies to share relevant and proportionate
information about current risk, after which agencies agree actions to reduce risk and increase
safety. The primary focus of the MARAC is to safeguard the adult victim. However, the MARAC will
also make links with other processes and agencies to safeguard children and manage the
behaviour of the perpetrator. MARACs are attended by a range of adult and children’s services
including Police Scotland, Women’s Aid, local authority and health services. 
Brighter Pathways: re-modelling care options 
The Health and Social Care Partnership have embarked on a programme of work to address the
current challenges associated with resources and accommodation for looked after and care
experienced young people. A Programme Manager has been appointed and will work alongside a
Planning Manager and Senior Management, to deliver and support the transformational change
over the next two years. A Programme Board has been established and chaired by the Chief Social
Work Officer, with membership from key stakeholders and Corporate Parents, to provide strategic
leadership and governance to support the workstreams and allocate resources where required. 
The Project Board will work jointly with key stakeholders to focus on shifting the balance of care
from high cost purchased residential accommodation to alternative community resources, supported
carers, supported accommodation, family placements (foster / kinship care) and to provide support
to families in need of intensive support. 
The work of the Brighter Pathways programme board will be closely aligned with The Promise
development plan and the work of the Corporate Parenting Steering Group which is responsible for
overseeing the six Corporate Parenting duties and each corporate parent upholds the rights and
safeguard the wellbeing of Care Experienced people. 
There is a shared awareness with regards to the current pressures and a commitment from all
corporate parents and key stakeholders to contribute to the work of the project to deliver services
differently and for children and young people to have access to the appropriate resources and
supports into adulthood. 
141

Page 142

15 
Unaccompanied Asylum-Seeking Children/ Trafficked Young People 
Unaccompanied asylum-seeking children (UASC) and separated migrant children under the age of
18 who have been trafficked to Scotland, are looked after and accommodated by local authorities as
children in need under Section 25 of the Children (Scotland) Act 1995. 
Over the last few years there has been an increase in young people coming to North Ayrshire
through the mandate of the National Transfer Scheme in 2021. Trafficked young people are
spontaneous arrivals and we are required to identify appropriate accommodation for these young
people at short notice as the notification is usually through out of hours social work and there is lack
of opportunity to plan and resource accommodation options. 
We are proud of the support that we offer displaced and disadvantaged young people and we are
committed to supporting these young people into adulthood and support their asylum process,
educational needs and their transition from residential care to semi-independent or independent
living. 
The Refugee and Resettlement team continue to liaise with a range of multi-agency partners. This
work is usually more complex and involving Professional’s Meetings and Team Around the Child
Meetings as well. Each department brings its own area of expertise to enhance the client’s
experience and hopefully make difficult issues a little easier to understand and address. 
We continue to work with Refugees from Syria, Afghanistan, and Ukraine (for social care only).
However, it has been decided that we are no longer taking people on the UKRS (Syrian)
programme. The Afghan programmes continue. 
Currently we work with 624 people from Ukraine, Afghanistan and Syria all on programmes such as
Scottish Super Sponsor Scheme, UKRS and ARAP. We also have contact with people on
Homes4Ukraine programme and at times BNO’s – Hong Kong Nationals. We found out earlier this
year that one of our Syrian ladies has got through to the Adult Learners Final in Edinburgh. 
We employed two Family Wellbeing Support Workers in early 2023. Training was developed and a
Newsletter has been produced to provide information about services as well as informing clients, for
example, bank holiday information, how to access services and dates for community events such as
the Summer Fun days. The NHS team were up to full quota by May 2023 and have taken on the
healthcare work related to our Ukrainian families.   
Rosemount Crisis Intervention and Intensive Support Service 
The Rosemount Crisis Intervention and Intensive Support Service continues to support children and
families to remain together and prevent the need for children to become looked after and
accommodated. 
Family Therapies 
Notre Dame have been commissioned to support children and young people under 12 years old,
and their families, with specialist therapeutic interventions and counselling to aid their recovery and
support them to overcome abuse they have experienced. We are expanding the criteria so that any
child/ young person who has experienced emotional and/ or physical abuse or neglect can be
referred to Notre Dame and be supported. Basing each case on 26-36 weeks of intensive therapy
over three 10–12-week blocks, approximately twenty-four young people and family members (as
appropriate), can be supported. 
142

Page 143

16 
Break the Silence have also been commissioned to support children and young people over 12
years old with specialist therapeutic interventions and counselling to aid their recovery and offer
support to overcome abuse they have experienced. 
We have commissioned several forms of therapy including Art, Play, Dance and Pet Therapy to
support children and young people. 
Trauma 
There is ongoing work within Police Scotland to deliver bespoke training to all staff ensuring trauma
informed thinking is at the forefront of policing in Scotland.  A Looked After & Accommodated
Protocol is in place to minimise negative contact with police and care experienced persons. 
The Active Schools Team have undertaken bespoke training to make sure the team are trauma
informed and use these principles throughout all their work. The Trauma Informed principles will
now be written into the Active Schools Annual Action plan collaborating closely with schools and
communities. This will be the first of its kind across the Active Schools network. 
We have appointed a Trauma Champion within the Health and Social Care Partnership and are
establishing a Trauma Working Group which will focus on trauma aware and trauma skilled
approaches, and the creation of a website and e-learning modules. 
Health and Wellbeing 
During school session 2022-23, we have continued to focus on ensuring children, young people and
families have access to the right supports at the right time in our schools and communities. One
cluster has piloted the Whole School Approaches to Mental Health and Wellbeing self-evaluation
tool, and this has shaped the further enhancement of supports within establishments. 
Education staff have had access to an extensive range of professional learning opportunities with
an additional 200 members of staff engaging with our Children and Young People’s Mental Health
and Wellbeing Professional Learning Resource this session. We now have 93 members of staff
across a range of schools who are trained to deliver Let’s Introduce Anxiety Management (LIAM).
To broaden the reach of this approach, we have this year developed a “LIAM at home” project
which targets children and young people whose engagement with education is impacted by anxiety.
This new project is showing early signs of success. 33 children and young people have completed
the wider LIAM programme this year with an additional 8 engaging with group work. Positive
impacts have included: young people who can now cope with being in crowded spaces; a reduction
in exam stress; and an increase in the number of young people who are now able to come to school
without feeling anxious. 
We have delivered Suicide Prevention Training, with 15 additional staff trained in Applied Suicide
Intervention Skills (ASIST), 54 members of staff trained in Assessing Suicide Risk in Kids (ASK) and
29 in safeTALK – Suicide Awareness training. All S6 pupils in our Secondary Schools have been
offered Suicide Awareness Training (safeTALK) with over 100 young people taking part in training
during June, feedback from young people indicates they feel more confident to have conversations
around wellbeing with their peers. 
Our partnership with See Me See Change continues to develop by contributing to the further
enhancement of the national anti-discrimination and stigma youth programme. 200 senior pupils
took part in training in June 2023 in preparation for next session. This session, the See Me
Ambassadors delivered assemblies, PSE lessons, supported mental health and wellbeing sessions
in Primary schools and held bakes sales to raise awareness of mental health. 
143

Page 144

17 
We have invested in the recruitment of 12 additional Area Inclusion Workers who, along with the
original team have undertaken extensive professional learning around supporting children and
families with their mental wellbeing. They have a key role in maximising school attendance,
providing support and guidance to families and delivering Health and Wellbeing sessions to
children. Most pupils who have engaged with one of our Area Inclusion Workers have shown an
improvement in their mental health and wellbeing and school attendance. Further evaluation is
continuing to support the identification of the most impactful interventions. 
Family Centred Wellbeing Service 
The Family Centred Wellbeing Service (FCWS) is a partnership between North Ayrshire Health and
Social Care Partnership and Education, targeting early intervention support to children of primary
school age (5-12 years) and their families in two of North Ayrshire’s localities. The remit of the
FCWS has been expanded to include support for children with Neurodevelopmental Differences
(NDD) and their families.  This will support North Ayrshire’s transformational approach to the
national neurodevelopmental service specification and will see the service expand to all localities in
North Ayrshire, including Arran. 
The service has a focus on supporting children and families where neurodevelopmental differences
(NDDs) are present – with or without a diagnosis – and this is impacting on family functioning and/
or a child’s physical, social, emotional, behavioural and/ or mental health and well-being. This focus
on NDDs has been necessary due to changes in CAMHS’ referral criteria, that is, children will not be
accepted for a neurodevelopmental assessment unless there is an accompanying mental health
concern. It is anticipated there will be a significant level of unmet need in terms of upskilling parents
in their capacity to understand and support their children’s distressed behaviours in the context of
their emotional wellbeing, whether they have a diagnosis or not. The service seeks to support
parents to adopt strategies to assist their children to regulate their emotions, and to implement
appropriate routines and boundaries that will help each child reach their full potential. Similarly,
there will be a need to provide individual support to children and young people to build their
resilience and equip them with skills to communicate their emotions and increase coping
mechanisms. 
From 01/10/23 to 31/03/24, the FCWS received 131 referrals for 258 children (including sibling
groups). Of these referrals, known or suspected NDD was indicated in 62%, with the majority being
children without a formal diagnosis. 
The team has formed an alliance with the Neurodevelopmental Empowerment & Strategy Team
(NEST) in Ayrshire, which offers resources on various issues that can affect a child with NDDs.
NEST provides face-to-face workshops for parents and carers which are facilitated by health
practitioners, covering topics such as sensory needs, diet, sleep, executive functioning, and so on.
The FCWS has actively facilitated parents’ attendance at workshops and taken on a role of assisting
parents to implement strategies into their day-to-day routines.  NEST now has a locality worker for
North Ayrshire, and along with other local and national organisations, and the professionals who will
be located within the service (Speech & Language, Occupational Therapist, and the Educational
Psychologist) the team will be extremely well equipped to empower parents to meet the needs of
neurodiverse children. 
The team has actively linked families with Welfare Rights services to maximise income and ensure
that parents/ carers are gaining access to benefits, such as, the Child Disability Payment, if they are
entitled to this, particularly if a child does not have a formal diagnosis. 
We also encourage parents who are not in employment to access employability services, such as,
We Work for Families (The Lennox Partnership), and this contributes towards the outcomes and
local priorities of tackling child poverty and mitigating the impact of the cost-of-living crisis. 
144

Page 145

18 
In terms of reducing the number of families in crisis and children being subject to child protection
registration, the FCWS has a pathway with the Child Protection (CP) team in North Ayrshire.  Where
safeguarding concerns exist, a CP social worker undertakes further assessment alongside the
FCWS worker.  Should risks be identified and concerns substantiated, the CP team will undertake
formal investigation and take the family to case conference. Only when registration is implemented
will the FCWS step back and the case will be progressed via the CP Team.  However, in the past six
months, only one case has progressed to a CP investigation. This did not result in registration, and
it was decided that it would be proportionate for the case to remain with the FCWS and for our team
to continue with an intervention. 
The team has been effective in reducing families becoming involved with statutory services, and
how the numbers of families requiring crisis intervention can be reduced by the availability of this
early intervention resource. 
Transitions Post School 
Each secondary school has a Developing Young Workforce (DYW) Coordinator who promotes
opportunities and pathways designed to ensure young people have the opportunity to develop skills
responsive to future economic changes.  Specific data is used by Skills Development Scotland
(SDS) and other partners for early intervention and support in advance of anticipated school leaving
date. For example, in partnership with SDS and our Local Employability Partnership (LEP), 169
young people were identified to take part in an offer delivered by employability training partners
CEIS (Community Enterprise in Scotland). Young people took part in workshops focusing on
confidence, skills & qualities, workplace health & safety and money management. 
As part of the Local Employability Partnership, an evening was held targeting young people
considering next steps beyond school. The Your Next Move event was attended by over 600 young
people and families with over 40 local employers and Ayrshire College represented. Supplementary
events were also held on Arran and a uniquely adapted Reverse Job Fair for Lockhart Campus to
ensure universal access for all leavers.  
145

Page 146

19 
Case Study - Scottish Fire and Rescue Service 
The Youth Volunteer Service of the Scottish Fire and Rescue Service aims to create a safe,
enjoyable environment for young people to learn, build relationships, and contribute to safer
communities. It offers opportunities for skill development, community engagement, and insight
into the workings of the fire service. Participants gain practical understanding and support
community development while enhancing personal skills and confidence. The program doesn't
guarantee future employment but focuses on personal growth and skill enhancement. Volunteers
are encouraged to attend sessions regularly and participate in community events. The service is
committed to providing an inclusive environment free from discrimination and harassment, aiming
for volunteers to enjoy their experience and gain valuable skills. Clear expectations, support, and
training are provided to ensure volunteers' safety, development, and enjoyment.  Volunteers are
expected to behave professionally, seek guidance when needed, and adhere to safety
protocols.   
So far, 22 volunteers have attended the unit, five have already progressed through the unit and
are now instructors.  One of these individuals has also now been accepted to represent SFRS
On-Call Duty System, whilst another one of the youth volunteers is now an instructor also
received the Youth Volunteer Award at the Tri-Services last year. The program has yielded
positive outcomes, with several volunteers progressing to become instructors and receiving
recognition for their contributions. 
146

Page 147

20 
Priority 3: Making things fairer 
Key Highlights and Case Studies 
Child Poverty 
Our Child Poverty Action Plan for 2023-24 continues to build on the work progressing to tackle child
poverty and the cost of living crisis.  In session 2022-23, financial gains for families who have
worked with the Schools’ Welfare Rights Officer was £572,060. 
Workers in both the Rosemount Project and Family Centred Wellbeing Service are vigilant in
ensuring that, where relevant, parents are encouraged to utilise Employability supports to increase
their prospects of entering work, training or further education. 
The Education service identified reducing the cost of the school day (COSD) as an area of focus for
schools. It is recognised that education can support children to find a route out of poverty, but
crucially only if children and young people can access education as fully and equally as possible. An
action plan for reducing the cost of the school day has been used to build upon the priorities
identified by North Ayrshire’s Tackling Child Poverty and Cost of Living Board. 
The Education Service, in partnership with the Youth Participation team has made very good
progress towards reducing the COSD for children and young people. Learner Participation has
played a key role within our Child Poverty strategy and action plan and as part of our commitment to
ensuring children and young people are at the centre of our efforts to reduce the COSD. Our second
COSD conference was held in May 2023, where we brought together over 170 pupils from across
North Ayrshire Primary and Secondary Schools for a full day of activities led by Education staff and
the Youth Services team. 
All educational establishments have been encouraged to use the COSD toolkit. Schools using this
approach have seen positive changes, including the following: 
• Uniform recycling and new school uniform policies implemented to reduce costs 
• Support towards transport to and from school and external trips and visits 
• Food initiatives e.g. breakfast clubs, holiday lunch provision, healthy snacks 
• Extra-curricular activities and after school Clubs 
• Support and fundraising for equipment and trips 
• Digital support 
• Period dignity products 
• Supporting children beyond the school day 
Pupils and staff have shared good practice across establishments as well as throughout the
community via school and early years networks, youth participation and locality planning forums.
There is now a stronger commitment to continuous improvement and a focus on reducing the cost
of the school day and the barriers experienced for children and families and poverty. 
Attainment
The latest published achievement figures are for 2022. Combined Numeracy achievement for P1,
P4 & P7 is 76%, an increase of 9 percentage points on the previous year. Similarly, combined
Literacy achievement for P1, P4 & P7 is 67%, an increase of 8 percentage points on the previous
year. It is evident that the additional interventions in literacy and numeracy have had a significant
impact in continuing recovery from the pandemic. Early indications are that this improvement has
continued throughout school session 2022-23.
147

Page 148

21 
Improving leavers’ attainment in literacy and numeracy 
Performance of school leavers in attaining Literacy at Level 4 and Level 5 displays a positive 5-year
picture. In 2022, our school leavers have outperformed all other comparators at both level 4 and
level 5, with 95% achieving literacy at level 4 or better and 84% achieving literacy at level 5 or
better. 
The performance of our school leavers in attaining Numeracy at Level 4 and Level 5 also displays a
positive 5-year trend. For Level 4, 91% of leavers achieved this which is the second highest figure in
the 5-year trend. Similarly for Level 5, 71% of leavers achieved this which is also the second highest
figure in the 5-year trend. 
Learner outcomes post-school 
The School-College partnership with Ayrshire College continues to form a valuable part of the
curriculum. The offer provides high quality senior phase vocational courses from Level 4 and above
and continues to support young people to prepare for employment and Further or Higher Education.
It also builds a network of support for young people as they move between school and college or
university and plan progression pathways onto full-time courses. Our School-College Partnership
team meet regularly to discuss the attendance and progress of each pupil to ensure all possible
step success on their college course. 
Education works in partnership with Employability Service to offer individualised support. This feeds
into a programmes, partners and referrals process which offers various pathways for vulnerable
leavers and supported by partner agencies. For example, Barnardos are employed for outreach and
targeted work with young people, including care experienced, facing significant challenges in
accessing a positive destination. 
School Leavers entering an initial positive destination 
An initial positive destination means that a school leaver has gone on to one of the following
activities immediately after leaving school: further or higher education, training, skills development
or employment. At 96%, the proportion of our leavers moving into an initial positive destination is the
highest on record. To maximise the percentage of school leavers entering and sustaining positive
destinations, schools continue to work hard in strong partnership with Skills Development Scotland. 
The Annual Participation Measure for all 16-19 year-olds 
The Annual Participation Measure (APM) is a measurement of the proportion of 16-19 year olds
participating in education, training or employment over a whole year (1st April-31st March). The
indicator provides a measure of the status of the wider aged 16-19 cohort – not just those who have
left school. The Annual Participation Measure, covering the year from April 2022 – March 2023
showed that of the 5,872 16-19 year olds in North Ayrshire, 93.9% were in education, employment
or training and personal development. This is the highest on record since the APM started in 2016. 
Further details on school attainment and achievement can be found online at – Education Services
Standards and Quality Report 
Libraries 
105 Bookbug Early Years Literacy sessions have been held with over 1,000 adults and 1,200 pre-
school children attending. 1150 Bookbug bags were gifted to P1 pupils during library visits. Our
Lifelong Learning team delivered a range of sessions for families such as, Bookbug on Tour, Forest
Fun and sensory play at a range of indoor and outdoor venues across North Ayrshire. There were
148

Page 149

22 
193 primary/ early years class visits supporting a range of topics with 3,892 children and adults. As
part of Book Week Scotland in November, 54 primary one classes and 1,022 pupils attended the
interactive sessions in libraries. Support for afterschool activities continues to be strong with 272
sessions and 1,785 attendances from children. 
The Learning Community Librarians (LCLs) are supporting 4 Duke of Edinburgh pupils to assist in
the school libraries, 4 pupil volunteers to help deliver activities for the weekly book group, 4 S4
volunteers helping to organise the monthly Family Book Group and a senior pupil working in the
library as part of their Saltire Award (assisted by Pupil Support staff). One LCL had a successful bid
for national funding through the Scottish Library & Information Council’s School Library
Improvement Fund. The project aims to “bring pupils of Ardrossan Academy and Winton Primary
together using stories. Events for “Let me Tell you a Story” with author Victoria Williamson so far
have been very successful. 
We were proud of one of our Junior Rangers who after 5 years with the group was the first recipient
of the SCRA JR leadership award. Further information can be found here - 
North Ayrshire Ranger Service. 
Digital Learning 
14 schools have achieved the Digital Schools award with almost all North Ayrshire schools
registered and on the way to achieving this award. Many schools are also working towards the
Digital Wellbeing award, demonstrating a strategic approach to cyber resilience and internet safety.
Senior school leaders from across the authority engaged in a professional learning programme
entitled ‘Evolving Digital Thinking’, supporting this journey. An established network of Digital
Coordinators continue to meet termly to develop digital skills and cascade these within their school
contexts. Pupil Digital Coordinators have met twice, learning new skills and networking with other
schools, with plans to build on this further next session. 
Care Experienced Children and Young People 
Our Corporate Parenting Plan (2023-2026) has been co-designed by Care Experienced Young
People and addresses their priorities and commitments we have made to them. All the priorities and
actions lead to the fulfilment of the Promise. 
Our Corporate Parenting Plan (2023-2026) can be found here – North Ayrshire's Corporate
Parenting Plan. 
Some key highlights include: 
• A Family Wellbeing Support Worker has been appointed to specifically work with families
where two or more children are at risk of being looked after or are looked after and their
principal role will be to strengthen relationships between family members.
• Every children’s residential house has a named link Nurse to enhance communication and
to address any health issues timeously.
• Health and Social Care have developed and implemented their ‘Keeping Sisters and
Brothers Together’ policy. 73% of Sibling Groups are together in the same living
environment. This is likely a result of the above policy and an even greater focus on
keeping siblings together combined with guidance and updated processes.
• Police Scotland’s ‘Looked After & Accommodated Protocol’ has been established to
minimise negative contact with police and care experienced young people. Facilities within
Police Offices have been modified to accommodate care-experienced young people and
minimise trauma.
149

Page 150

23 
• The Health and Social Care Partnership have developed several new programmes focused
on diversion and youth offending.
• Universal Early Years staff have Trauma Informed Modules within their mandatory training
to support them to achieve a deep understanding in the context of trauma.
• Campus Police officers and the newly formed Community Wellbeing Unit are trained to
support care experienced individuals through engagement and education. 
Housing Services have introduced a care experienced housing officer to be a single point of contact
for Care Experienced Young People. The Throughcare/Aftercare Service have a Housing Protocol
in place where care experienced young people are prioritised and supported to ensure they
maintain their tenancies. Young people are supported to remain with their Kinship Carers and
eligible for continuing care. They will receive ongoing support from Throughcare, and their carers
receive kinship care allowance until the young person is 21 years. 
In the last three years there has been a 10.7% increase in young people in kinship care placements
and significant increase in numbers of young people requesting continuing care. The uptake of
Continuing Care has increased as training, guidance, policy changes, and embedding processes in
the review meetings have all been established and implemented over the last three years. 
We have more Children and Young People in positive destinations such as college or university
than ever and in our three recent inspection reports, our approaches to continuing care have been
highlighted as best practice. Kinship Care has also increased as we have adopted our ‘family first’
approach in practice and policy. 
Care experienced children and young people continue to be supported through a range of
interventions where the focus is on delivering equity and improving educational outcomes. 
The MCR Pathways Young Talent programme supports our young people in, or on the edges of
care within 6 secondary schools. In the last academic year 229 young people were supported
through the programme.  Of this number, all 102 S1 and S2 pupils participated in weekly group work
throughout the academic year. The focus of this group work was on building self-esteem and
confidence, strengths and interests, teamwork, problem solving and employability skills. A further 50
young people were directly supported by one of our MCR Pathways Co-ordinators, who are
members of the school’s extended pastoral support team. They provide an enhanced and integrated
level of support, liaising with partners. A large number of this group are preparing to be supported
by 1:1 mentors. 
A key part of the MCR Pathways programme is the use of mentors from across our communities.
Our mentors come from local businesses, the public sector and the third sector. They have a wealth
of experiences and life skills. They all share the same desire to support a young person in their local
community and give something back. Our mentors are trained and supported throughout each stage
of their mentoring relationship with their young person. This year, 77 young people were supported
in weekly face-to-face sessions by a mentor, with plans to increase this figure in the near future. 
The impact of the MCR programme is evident in: improved literacy and numeracy outcomes for this
group; improvements in the number and level of qualifications achieved and 100% of this year’s
leavers group supported by this programme entering a positive destination.  
150

Page 151

24 
Case Study - MCR Pathways 
Amy* and John (*Young Person Name changed) - Auchenharvie Academy
"When Amy was first introduced to the MCR Pathways programme she was a shy girl who had low
self-belief. She had a clear idea of what she wanted to be when she was older, which was to be an
aeronautical engineer. Amy was unsure of how she could reach this career, as she was struggling
academically in most subjects, particularly maths, which was essential for her chosen post school
career.
Amy was matched to mentor John who had spent a significant part of his career as an engineer.
John and
Amy were both extremely laid back and had a calm demeanour. Amy needed a mentor who was
not going to pressure her or be too persistent and John’s patience and calm nature allowed the
relationship to move at Amy’s pace.
John and Amy bonded straight away. As well as having shared career interests, they also had
many common hobbies/interests to discuss. The main commonalities being travelling and theatre.
John was a great supporter of Amy and supported her to believe that she could achieve anything
she set her mind to. He supported her with the subjects she was struggling with. and helped Amy
grow in confidence and believe her goal could in fact be reality.
Amy is a young person who is now confident and has a strong work ethic. She applied for many
aeronautical engineering apprenticeships and college courses and is going to pursue her
unconditional offer for PEO at college. She has also attended college visits, day courses etc and
has seized any opportunity for more experience to help her with her goals, with John encouraging
her throughout this. 
Amy’s attitude is brilliant and I am confident she will go on to achieve her goals in life." 
151

Page 152

25 
Care experienced leavers in North Ayrshire are continuing a positive 5-year trend of attainment in
the number of Level 4 and Level 5 qualifications achieved. In 2022, 87% of our care experienced
leavers attained at least 1 qualification at SCQF Level 4 or better, the highest performance in the 5-
year trend. For Level 5, 62% of care experienced leavers achieved at least 1 qualification which is in
line with highest performance in the 5-year trend. 
Whole Family Wellbeing Fund 
Through the Whole Family Wellbeing Fund, third sector organisations have been engaged in the
transformational activity required to support holistic family support, shift focus to early intervention
and prevention and work towards the aspirations of The Promise.  This has included: 
• Universal Early Years partnership with national charity Dads Rock to bring a Dads Support
Worker into the existing integrated UEY team.  The worker supports dads and other male
caregivers with children in the early years with practical parenting skills, empowerment and
confidence in their role as dad.  One to one support, as well as group support is being
provided by the worker and there is also a review of current processes within UEY to ensure
inclusivity to dads, and not just mums.  
• Barnardos - Barnardos will scale-up the existing Stronger Families service, providing a focus
on Kinship Families who have been affected by substance use. Stronger Families is trauma-
responsive and adopts a whole family approach, aligning with the National Principles of
Holistic Whole Family Support, The Promise and Children’s Rights. In the short time it has
been operating, it has proven to be an effective and successful approach to supporting
Children, Young People and Families impacted by substance use.
• Ayrshire Children’s Services - Delivery of 3 x 15 week “Nurturing and Positive Parenting”
Courses for parents/ carers who are currently awaiting referrals, are on the periphery of
social work care and/ or are at the point of crisis.  This is a new element to the existing work
of Ayrshire Children’s Services with the overall aim of developing a Family Wellbeing
Service.
• Impact Arts - Plan to run two 6-month programmes a year for 2 years in different localities in
North Ayrshire, working with ten to twelve parents or kinship carers in each programme, to
support them to: better understand their child(ren)’s behaviour; develop tools to connect,
communicate and support their child(ren) including approach (e.g. activities being led by the
child; being curious), language and play activities; identify their own needs and develop
coping strategies for themselves; connect with other parents, access peer support, and
develop their local support networks by linking in with other local organisations which can
support other aspects of family life.
• The Ayrshire Community Trust – will deliver a tiered model of universal family support and
engagement within the Three Towns area with additional targeted family support to a smaller
number of identified families through 1-1 and small group work provision.  The project will
build on the significant work already being delivered to support local families in relation to
poverty, employability and community connectedness.
• The STAR Centre – Ayrshire’s Rape Crisis Centre will use WFWF funding to recruit a family
worker who will work with parents, carers and the wider family of young people aged 13
years and above who have been sexually assaulted.  Currently only supporting the young
person themselves, this expansion will provide a more holistic approach to the family,
helping them to understand what has happened and enabling them to offer appropriate
support to their child/ family member. 
152

Page 153

26 
Case Study - Dads Rock 
In a first of its kind partnership our Dads Rock worker is embedded in the Universal Early Years’
team with funding from the Scottish Government Whole Family Wellbeing Fund. We’re helping
Dads and families to be the best that they can be by supporting them to give their children the
best possible start in life. This means working with Health Visiting, Midwifery and Social Work to
provide bespoke 1-1 support for dads and their families at home and in the communities of the
Saltcoats, Stevenston and Ardrossan, with a view to supporting the whole of North Ayrshire in
time.
A key part of this work is the new North Ayrshire Baby Group for Dads led by Ryan, our Dads Worker.
After speaking to local dads, community partners and Health and Social Care partners we
recognised that there needed to be a place for Dads to come together and share their experiences
of growing as parents. Though Ryan provides the group it’s the openness and care for one another
that drives the group and creates the supportive atmosphere of the group. Ryan says: “The role has
been extremely rewarding, right from day one. I’ve got over 10 years experience in family support
work, most of which was creating Dads support in Glasgow and so I really feel like I’m right where i
need to be. I like that every day is different and I get to create amazing connections for dads. So
many of them don’t have a pathway when they’re struggling, and the NHS can find it difficult to
design services around dads support needs- so by being a Dads Worker, these dads can connect
to NHS resources through me and get the advice and support they need, meet other dads and build
great connections”.
“We know that dads will do anything for their children so the group is pitched more as a baby group
for dads, rather than just a ‘dads group’ for a reason. It’s a great way for Dads to explore how babies
grow and develop, but it's also a really good way for dads to meet other dads and learn from one
another”. 
Quote from Social Worker - “Ryan and I have worked closely together to provide extensive
support, advice and guidance to two vulnerable families that are on my caseload. Since Ryan
has started we have undertaken 5 joint visits some of which when families/dads have been in
crisis. It has been a pleasure to work alongside Ryan. Ryan has been actively involved in the
care plan for both families. Ryan clearly has a wealth of previous experience and has used his
transferable skills to this current post." 
153

Page 154

27 
Priority 4: Promoting good mental health and wellbeing 
Key Highlights and Case Studies 
Nurture
During school session 2022-23 we have undertaken a range of activities to support our Promoting
Positive Relationships approach. This has included work on Building on Positive Relationships
(based on the Non Violent Resistance approach) for both schools and parent workshops. We have
run three parent workshops over the session with parents reporting a significant improvement in the
behaviour of their children following the workshops. Using the widely available and respected
Strengths and Difficulties Questionnaire as a basis for measuring impact, the mean scores for
children’s total difficulties significantly reduced following the 10-week parent group. We have also
run workshops for our primary and secondary schools as well as our Area Inclusion Workers and
further developed our Building on Positive Relationships plans in line with this. 
A key part of our work has been a review of our whole school nurture approach to ensure that
nurture principles are embedded within the whole school system at the same time as building
capacity towards a consistent, authority-wide approach to whole-school nurture. This review has
included surveys with stakeholders including: 
• 832 staff who responded to our main review questionnaire
• 32 children and young people in focus groups across 4 primary and 2 secondary schools
• 11 Educational Psychologists, 15 Head Teachers and 141 teacher and classroom assistant
responses to additional questionnaires 
Following the review, work has commenced on updating the professional learning programme
supporting this work, developing a whole school nurture benchmarking framework to support school
self-evaluation and planning for improvement in this area and the establishment of a Service
Improvement Group to take this work forward into session 2023-24 and beyond. 
There are currently 22 Primary Nurture Groups and 9 Secondary Nurture Groups, with 4 further
primary PEF funded groups operating a range of tailor-made nurture models with target groups,
supported by the authority-wide Principal Teacher of Nurture. Clear guidelines have been produced
and shared with each sector, alongside a quality assurance framework and weekly professional
learning sessions. 
Some of the positive outcomes of targeted nurture approaches include: 
• Children and young people in primary and secondary settings who have received nurture
support are showing gains in social and emotional progress and are continuing to access
mainstream education.
• Children and young people who have received nurture support are attaining and achieving
more closely in line with peers over time.
• Education establishments can demonstrate an increased understanding and application of
whole school nurturing approaches. This will increase establishment understanding and
awareness of the interdependencies between effective nurture and mental health and
wellbeing support. 
• Of the 832 staff who responded to our nurture survey, 78% felt confident applying what they
have learned about nurturing approaches in practice.
• St Matthew’s Academy were awarded the prestigious Marjory Boxall Nurture Quality Mark
Award in 2023 in recognition of their support of children and young people. They also became
154

Page 155

28 
North Ayrshire’s first secondary schools to achieve the Rights Respecting Schools Gold Award,
in no small part due to their commitment to Nurture.
A longitudinal study is currently in preparation tracing the views and development of those pupils who
attended nurture previously, with publication expected in session 2023-24. 
Mental Health and Wellbeing 
The integrated early years team empower and enable parents and carers to support their child in a
range of areas.  During 2023-24, 965 Requests for Assistance (RfA) from the wider integrated team
were received. 527 Requests for Assistance (55%) were made to the Health Visiting Support
Workers to support parents with topics such as communication, behaviour, sleep, weaning and
toileting.  11% were made to the Family Nurturers for support with home conditions, community
integration, and bonding and attachment. 11% were made to the Perinatal Wellbeing Team for
support with maternal mental health difficulties during pregnancy or in the initial 9 months following
the birth of a child. 7% were made to the Early Years Social Workers for support with parental
mental health, relationship issues and home conditions.   
The Health Visiting Support Workers within Universal Early Years assist colleagues in Education to
deliver parenting programmes, such as Incredible Years, in a group setting. 
The Out and About project in the Garnock Valley, encouraged families to use the assets in their
local area and to spend family time together. Based on partner feedback a programme of Saturday
morning events were funded in the Garnock Valley libraries in the run up to the summer holidays in
2023. Families identified by the Family Care Workers have also benefited from KA Leisure
memberships to support them to continue to get out and about. They have also been gifted
experience kits which includes a range of items and activity ideas for families to enjoy both indoors
and outdoors. The Little Free Library was launched at Lochshore Park, Glengarnock with
environmental-themed books for children and families to use on site or borrow as part of the project. 
Connected Communities Mental health and Wellbeing have a variety of early intervention, positive
wellbeing, resilience and confidence building events and activities.  These are for age 5–25-year-
olds, including whole family approaches, work in schools and communities.  This varies from drama,
accredited programmes, outdoor learning, roadshows, murals, climate engagement and young
parents. 
Active Schools continue to support all schools to deliver high quality extra-curricular programmes
across Primary, Secondary and ASN schools. Our top 5 participation sports are Football, Netball,
Multisport, Basketball and Dance. 
Active Schools continues to support over 50 sport and physical activity clubs across the academic
year to deliver within our school settings. This includes the co-ordination of the delivery of weekly
sessions, health week inputs, full day delivery and promotional distribution. 
A full counselling review has been undertaken this session and has involved consultation with
stakeholders including children and young people, school staff and counsellors.  A literature review
of effective practice was also undertaken. This review has been used to shape the future model of
primary school counselling and update the well-established secondary school counselling service. 
In terms of how the counselling service has supported staff practice within our schools, the impacts
can be summarised in three main categories: 
• School staff are able to support individual pupils better (through for example being more
familiar with appropriate support strategies and language). 
155

Page 156

29 
• School staff have greater awareness and knowledge (of themes such as trauma and its
impact). 
• School staff have strengthened positive relationships (with for example other professionals
working together to support a young person, as well as strengthened links with the home). 
Children, Young People and Families have access to a range of supports and services within their
communities to support emotional distress and to promote positive mental health and wellbeing.
Data gathering and consultation with the community has been central to the development of
services. Key highlights include the employment of a Welfare Rights Officer (WRO) to engage
directly with families following referral from education staff. Over the course of the 2022-23 school
year, this has resulted in financial gains of over £572,000 for families who need it most. 
The link between financial insecurity and poor mental health is well documented and the positive
impacts of our approach in North Ayrshire are increasingly evident. 71 children, young people and
families have benefited from co-produced bespoke supports which have had a positive impact on
mental wellbeing. Examples of referral reasons for support include family relationships/ home
issues, poverty/ homelessness, trauma, with many children and young people experiencing multiple
barriers to positive wellbeing. 
A review of the Kilwinning and Largs Wellness models has taken place.  We have used this review
as the basis for developing a refreshed and expanded approach to supporting children and young
people’s wellbeing across the whole authority, with the revised Wellness Model being rolled out to
additional localities. Our review highlighted the importance and benefits of all agencies working
together to have a positive impact on mental health and wellbeing in our communities. 
We have continued our focus on Whole school approaches to mental health and wellbeing
(MHWB), ensuring children, young people and families have access to the right supports at the right
time. One school cluster has piloted the Whole School Approaches to MHWB self-evaluation tool,
and this has shaped the further enhancement of supports within establishments. 
Education staff have had access to an extensive range of professional learning opportunities with
an additional 200 members of staff engaging with our Children and Young People’s Mental Health
and Wellbeing Professional Learning Resource this session. In addition, we now have 93 members
of staff across a range of schools who are trained to deliver Let’s Introduce Anxiety Management
(LIAM). To broaden the reach of this approach, we have this year developed a “LIAM at home”
project which targets children and young people whose engagement with education is impacted by
anxiety. This new project is showing early signs of success. Across the authority, 33 children and
young people have completed the wider LIAM programme this year with an additional 8 engaging
with group work. Positive impacts have included: young people who can now cope with being in
crowded spaces; a reduction in exam stress; and an increase in the number of young people who
are now able to come to school without feeling anxious. In addition we have delivered Suicide
Prevention Training, with 15 additional staff trained in Applied Suicide Intervention Skills (ASIST),
54 members of staff trained in Assessing Suicide Risk in Kids (ASK) and 29 in safeTALK – Suicide
Awareness training. All S6 pupils in our Secondary Schools have been offered Suicide Awareness
Training (safeTALK) with over 100 young people taking part in training during June, feedback from
young people indicates they feel more confident to have conversations around wellbeing with their
peers. 
We have refined our information sharing process form our Emergency Department for our Young
Persons Suicide Prevention Pathway to ensure services receive the right information at the right
time. This Young Person Suicide Prevention Pathway is intended for young people up to 18 years
old who have made a significant attempt at taking their life i.e. non-fatal overdose, act of self-harm
significant enough to require treatment & intervention or deliberate act of a suicidal nature.  The
pathway delivers a prompt partnership response with follow up arranged within 48 hours to ensure
that no young person falls through the net.
156

Page 157

30 
The Suicide Prevention Task Force continues to circulate information across our Children and
Families Services regarding Mental health and/ or suicide prevention training. 
Our partnership with See Me See Change continues to develop with our Education Service
contributing to the further enhancement of the national anti-discrimination and stigma youth
programme. 200 senior pupils took part in training in June 2023 in preparation for next session. This
session, the See Me Ambassadors delivered assemblies, PSE lessons, supported mental health
and wellbeing sessions in Primary schools and held bakes sales to raise awareness of mental
health. 
The Child and Adolescent Mental Health Services (CAMHS) specification came into operation on
the 1st August 2023 and with that, the national neurodevelopmental service specification. A North
Ayrshire Children and Young People Neurodevelopmental Service Specification Implementation
Group was established in June to take forward key aspects of the service specification.  Progress to
date has included: 
• Mapping and gap analysis of available family supports for children with Neurodevelopmental
Differences (NDD) and their families
• Training needs analysis of the current children’s services’ workforce including primary care,
Allied Health Professionals, health visitors, school nurses, social workers, education staff
and third sector organisations.  A training plan will be produced from this to support
workforce development.
• Further engagement with parents and carers of children with NDD to hear in more detail
about their experiences of trying to access services and supports, strengths and areas for
improvement.  This will direct work in relation to family support, workforce development and
assessment and diagnosis.
• Drafting a neurodevelopmental pathway for North Ayrshire for children who are of school-
age but who do not have a co-existing mental health condition and commencing work to
agree appropriate screening tools.
• Expansion of the Neurodevelopment Empowerment and Strategy Team (NEST) to provide
dedicated support within North Ayrshire.
Pan-Ayrshire work to develop a diagnostic service is also underway. CAMHS has led some pilot
work with a small number of schools to undertake neurodevelopmental assessments with identified
children in the school, alongside their parents/ carers.  Findings from the evaluation will inform
future direction for assessment and diagnosis. 
Young Carers are a core partner in the Joint Youth Forum network where they contribute to
planning and shaping future plans and polices for both North Ayrshire and nationally. Needs are met
through collaboration with young people when they complete the Young Carer's Statement. 
The HSCP increased its investment in carer services threefold in 2023 through the recommissioning
of the Carers Support Service – now the Carers Gateway.  This has seen early indications of
increased young carers registrations as well as an increase in support activity based around
reducing social isolation. 
This session Young Carers have completed 400 statements. This is approximately 93% of all Young
Carers registered on school systems. Education and HSCP delivered a Young Carers Statement
workshop for 27 staff at the Professional Learning Academy the feedback from staff was positive
and contributes to building the skills within our teams of staff to support Young Carers across North
Ayrshire. 
157

Page 158

31 
During 2023-24 the Public Health Department published a chapter of the Director of Public Health
Annual Report titled “Director of Public Health - A Life-Course Approach to Understanding Mental
Health Report”. The main aim of progressing a life-course approach to mental health will involve
maximising the many opportunities to promote mental health and wellbeing across all of the life
stages, through preventive approaches and timely access and intervention/support for people where
a mental health need and mental illness/disorder presents. This will require a whole system
approach, recognising and acknowledging current work and success, and building on this for future
developments. 
Over the coming year Public Health will continue to identify opportunities to have dialogue with
colleagues and partners working in areas including children’s and mental health services regarding
the life course approach. 
Examples of Public Health Department activity in the previous year includes: 
• Delivery of “Mental Health Improvement – a practical approach” to colleagues and partners
working with infants, children and young people (i.e. Education, those working with non-
attenders at school, community groups) 
• Promotion and provision of Children and Young People’s Guide to Mental Health and
Wellbeing among other resources
• Support for a whole school approach to mental health and wellbeing. 
158

Page 159

32 
Case Study – Book Nook at Lochshore Park 
North Ayrshire Libraries has teamed up with Friends of Lochshore to create a new Book
Nook for the community. Nestled indoors, next to the café, at Lochshore Park Hub between
Beith and Glengarnock, it was launched on Wednesday 14 February at the community hub’s
monthly Story Tots session. 
Named, the Little Free Library, the Book Nook features nature-themed books for all ages.
A welcoming focal point, it forms part of a wider community project called ‘Out and About’ in
the Garnock Valley where library services and partners have been working on behalf of
communities to support families to get out and about in their local area, discovering some of
the amazing spaces on their doorsteps – all at no cost.   
This is the third Book Nook of North Ayrshire’s Little Free Libraries’ initiative – with others
located at the Harbour Arts Centre and at the Townhouse/Portal in Irvine. At the new
community space, parents and carers are encouraged to share a nature-themed story with
their children during their visit and use the books there to help identify flowers, fauna and a
host of creepy crawlies that can be found on the walks around Lochshore. 
Already a popular venue with local sports clubs, schools, and young families, Lochshore
Hub's new Little Free Library is all about encouraging visitors of all ages to pick up and
donate books out-with conventional library locations while learning more about what’s on
offer at Lochshore Park. Other elements of the redevelopment at Lochshore include the
newly-created 5km leisure route and walking path, the surrounding woodland plantation of
over 12-hectares, and the construction of a Natural Play Area currently underway. 
Councillor Alan Hill, Cabinet Member for Communities and Islands said: “It is great to learn
that our latest Little Free Library at Lochshore Park is proving a hit with young visitors there.
“Thank you to everyone who has helped us to bring the project to life and special thanks to
The Friends of Lochshore Park who have used their expertise to meticulously hand carve
the decorative owl and branch bookends. The lovely reading nook really does look right at
home, it’s as if it’s always been here. This is another brilliant example of how libraries can
work together with communities, partners and local volunteers to widen their offering and
provide exciting opportunities for experiencing the wonders of reading in new and exciting
places. The project is also about inclusion and social-connection too, as people can come
together to learn about nature and enrich their experiences at Lochshore.”
159

Page 160

33 
Priority 5: Inspiring children and young people to be active 
Key Highlights and Case Studies 
Physical Activity 
The Child Healthy Weight team continued to support children and their families to achieve a healthy
weight via the Jumpstart programme. The programme works with families with children aged 5 to 17
years old. Programmes provided: 
Jumpstart Junior: Aged 5 – 9 
Jumpstart Senior: Aged 10 – 13
JumpStart Teens: Aged 14 – 17
JumpStart Plus: Children with Additional Support Needs 
During 2023-24, 55 children and their families were referred to JumpStart (5 to 17 programme). The
referrals were split evenly between males and females with 28 males (51%) and 27 females (49%).
Of the 55 children referred, 29 children (53%) were aged 5 to 9 years old, 19 children (34%) were
aged 10 to 13 years old and 7 young people (13%) aged 14 to 17 years old. Also, the largest
majority of referrals were for families living in the most deprived areas 86% areas. 
90 group based physical activity and health education sessions were delivered by the Child Healthy
Weight Team in addition to attendance at 12 promotional events. We continue to partner with the
Trinity Active Travel hub, supporting events and initiatives aimed at promoting active lifestyles and
healthy habits. 
Positive outcomes for those participating on the programme include an increase in physical activity
levels; healthier eating habits including an increase in consumption of fruit and vegetables and less
consumption of foods high in fat, sugar and salt; an increased parental score on their child’s health
related quality of life (Peds QL), resulting in stabilisation or reduction in Body Mass Index Standard
Deviation Scores.  
Participating families also make use of a free leisure pass to access amenities such as the KA
Leisure Centres, which for many families would otherwise be cost prohibitive. 
The early years Tier 2 child healthy weight programme, Jumpstart Tots continued to focus on
working with health visiting service to identify families with children aged 2- 4 years who would
benefit from targeted interventions to enable healthy habits for healthy growth. 
During 2023-24, 9 children and their families were referred to the Jumpstart Tots early years
programme.  In total 16 families were supported by the early years programmes. There were 11
discharges, of which 6 families completed at least 75% of the programme and 5 families withdrew at
the early stages of the intervention. 
As with the school age programme, there were positive changes in dietary behaviours with those
who completed e.g. increase in fruit and vegetable consumption and a decrease in sugary foods
and drinks.  Families are also offered free leisure passes to enable the whole family to access
opportunities within KA leisure. 
A multidisciplinary working group was established with representation from early years education
across the 3 Ayrshire local authorities, further education, PEEPLE qualifications and dietetics with
the aim of delivering nutrition focused PEEP (Parents as Early Education Partners) groups within a
number of establishments in each local authority. The group identified 3 nutrition education sessions
160

Page 161

34 
for each of the 3 PEEP age groups and mapped NHS nutrition resources and activities to each i.e. 9
sessions developed in total. There have been 4 groups co-delivered between dietetics and early
years education over our 3 local authority areas. 
The team have worked closely with a number of partners including Ayrshire College to raise
awareness of early years nutrition and child healthy weight. Pilot work has focused on training all
early years students to increase knowledge and skills, as well as awareness of local supporting
services and resources. During January to March 2024 the team trained 89 students. In addition the
team have also participated in a service wide education event with Health Visiting to update on
topical issues around infant and early years nutrition. We have also had the opportunity to give an
update on early years child healthy weight programmes at a head teachers event in February 2024. 
In partnership with the Public Health Department, the team have been able to commission HENRY
(Healthy Eating and Nutrition in the Really Young) core training programme to a variety of partners
which contributes both to maternal and infant nutrition and child healthy weight programmes. This
training has a strong foundation in health behaviour change thus skilling participants to take a
strengths-based approach to supporting families.  Over 2023-24 there have been 7 cohorts of
training with over 100 participants, including health visitors, school nursing, maternity staff, early
years practitioners, oral health and allied health professionals.  A recent post programme survey of
participants highlighted the positive impact on practice of the course and the need to provide
supporting resources to further embed the learning into practice. 
In order to support early intervention and prevention the team are working with an area wide group
to develop a child healthy weight toolkit which will provide guidance on topics such as: weight/ BMI
measurement, raising the issue of weight/ health with families, health behaviour change, nutrition,
physical activity, current community programmes and training opportunities. In addition to these
topics, the toolkit will also provide pathways for different professions such as health visitors, school
nurses, and other healthcare professionals, as well as wider services and agencies to support early
intervention and prevention.   
161

Page 162

35 
An early years outdoor science resource was developed, led by our STEM team. The purpose of
this was to link outdoor learning experiences to Science experiences and outcomes and
Sustainable Development Goals. Professional learning sessions for this resource were attended by
215 practitioners. Evaluations were completed by practitioners following the training, 100% of whom
agreed that using the resource has helped them to make links between outdoor learning and
science experiences and outcomes, and that this would improve and extend the quality of outdoor
learning experiences. 
Over 100 staff attended further professional learning on outdoor learning and learning for
sustainability for primary-aged children. Whole-school training sessions have been delivered in
three schools and the STEM team has supported a further three schools through outdoor learning
team teaching inputs. 
Case Study – Dance Therapy 
During the 2023 Summer holiday period, the Child and Adolescent Specialist Substance Team
(CASST) ran a hip-hop dance therapy summer scheme for children and young people affected
by trauma and impacted by their own or parental drug or alcohol use, teaching dance classes to
aged 5–11-year-olds and over 12. The aim of the dance therapy sessions was as an
intervention to help with attention and focus, to improve communication, and to reduce feelings
of isolation, social anxiety, and chronic pain. Overall, 24 children and young people attended
across the summer holidays. This culminated in an end of summer dance show and prizegiving
for those in attendance. Feedback was gathered from young people and their parents/carers
using evaluation forms and was overwhelmingly positive. 100% of the children and young
people who attended reported as enjoying the dance therapy classes and expressed that if
given the option, they would attend again. Three of the parent’s feedback was [anonymously] as
follows: “While home life is very difficult and her sister’s needs tend to take up most of my time,
it has been great for her to have something so positive that is just hers. The positively and
energy of the class has really given her a much-needed boost”, “I love that X has her own thing,
has made friends (which she normally finds difficult) and dance improves her balance and
coordination”, “Y is so happy and gets so excited when it comes to a Thursday, she said this is
the best thing about the Summer holidays”. 
Due to the success of this, further dance therapy sessions have commenced, for age groups
12m - 5 years, and over 5. Dance therapy sessions are ran by our Family Worker and qualified
Dance Teacher Nicola Kane. 
162

Page 163

36 
School gardening training sessions were delivered by Ardrossan Academy staff to 10 primary
schools. A school gardening handbook has been created collaboratively, with advice, guidance and
good practice, and this has been shared with all schools. Finally, six of our schools participated in a
successful partnership with Go Wild Scotland, to provide nature experiences for learners, linked to
the curriculum. 
Last academic year Active Schools supported 51 North Ayrshire clubs to engage in schools. Clubs
delivered the following: 
• Curriculum enhancement sessions (PE slots over and above the schools 2 hours of PE)
• Health week sessions
• One off days in schools
• Visits to the club
• Promotion of club through distribution of flyers 
Furthermore, the progression of our North Ayrshire Community Sport Hub has gone from strength to
strength. In joint partnership with KA Leisure we have been supporting clubs with training, venues
and one to one development sessions. In collaboration with selected affiliated clubs, we have been
supporting the delivery of satellite clubs to encourage more localised participation. 
We are very proud of the number of distinct participants we are engaging with during extracurricular.
9,425 young people have attended a variety of sport and physical activity sessions across 2022-23,
over 53% of the whole young people population. Nearly 9,000 individual sessions were delivered to
achieve that number with 91,246 visits being made. 98% of delivery of our sessions were delivered
by volunteers – one of the highest across Scotland. 
We have robust leadership pathway from P6 to S6 and beyond. Our P6/7 programme Move and
Improve has 946 young people who have completed their training. Our Young Ambassador
programme bolsters 118 young people from all 9 secondary schools and ASN School. Our flagship
North Ayrshire Sports Academy had 189 young people as part of the programme, and they gained
on average 12- 15 qualifications that will support them either into employment or onto a positive
destination. On completion of these courses the young people then delivery sport and physical
activity sessions within schools and communities – over 5,000 volunteer hours have been delivered. 
The role of the Active Schools and Community Partnership is to work with key partners and
stakeholders to remove barriers for young people and families within Care Experience to take part
in Sport and Physical Activity using a Whole Systems Approach to lead a healthier Lifestyle.   
Across the last year we have delivered 47 different experiential opportunities to 332 young people.
The opportunities have ranged from residentials, skiing, team building days to outdoor activities.
The target groups for this work are care experienced, kids on the cusp, the inactive, New Scots (42),
or ASN (90 from Lockhart only). The participants are then supported into more frequent activity
within their own school or community of which 67% currently have taken this opportunity on. This
number is ever growing as this work is a key component of the role of the Active Schools and
Communities Partnership Officers. 
163

Page 164

APPENDIX 1 – Childrens Services Plan Ac�on Updates 2023-24 
The rights of children and young people are promoted and protected
No.  Action  Update 2023-24
1 Implement the North Ayrshire UNCRC
Plan actions, ensuring the rights of all
children and young people are
protected. 
The plan is currently in development, and we are working with National Partners to follow all relevant guidance. 
2 Ensure the voices of children and
young people are heard and influence
the work of the Community Planning
Partnership. 
Engagement took place with young people around the North Ayrshire Partnership Community Plan (LOIP) at meetings of the
Joint Youth Forum and Youth Council in 2023. These results are being used to inform our approach to including young
people throughout the lifespan of the Plan, as well as developing a ‘Plan on a Page’ to summarise the LOIP priorities.
3 Provide opportunities for children and
young people to develop their
citizenship skills, including active
democratic participation opportunities. 
Young people are fully embedded in the Participation and Citizenship work within Connected Communities including
executive youth council, Primary 7 youth council, Climate Change Ambassadors, Mental Health ambassadors, Joint Cabinet,
Joint Youth Forum and Pupil Councils.
4 Equality and Children’s Rights Impact
Assessment (ECRIA) will be carried
out on all new policies that affect the
lives of our children and young
people. 
Our Equality and Children’s Rights Impact Assessment (ECRIA) process includes children's rights and all new policies
consider this. 
5 Through the engagement workstream
of the care experienced task force,
work proactively with Children and
Young People. 
Some of the engagement work includes: 
• Joint Youth Cabinet with over 40 Care Experienced Young People
• The passing of the Council Motion for Care Experienced to be treated as a Protected Characteristic 
• The creation of a Champions Board network that involves over 50 care experienced young people being involved on a
monthly basis.
• The Promise is an ongoing activity and our Corporate Parenting Plan is based on the calls for action. We also employ a
whole family wellbeing worker funded by the Promise Partnership
6 Co-create with children and young
people new, systematic mechanisms
for maximising learner participation
and voice and create a new Learner
Participation Policy. 
The Learning Participation Policy has been created and is now in place. 
7 Ongoing consultation with children
and their families on service design
and delivery. 
Connected communities support consultation with young people for various departments throughout the year, this is
facilitated through focus groups, online surveys, events such as Primary 7 youth council, executive youth council and Joint
cabinet.
8 Ensure that Children’s engagement
forums focus on rights, helping
children and families understand
UNCRC and what this means. 
Connected communities support primary youth forums using a rights-based approach and through the transition work with
Primary 7s working with parents and young people.
164

Page 165

2 
9 Work with local partners/members to
identify opportunities for children and
young people to become involved
locally. 
Connected communities work with third sector organisations to promote opportunities for young people across North
Ayrshire.
10 Through our Advocacy Strategy
prioritise community-based advocacy
to children and young people
ensuring they are aware of their rights
and are appropriately represented. 
Barnardo’s Hear 4 U is an independent advocacy service based in Kilwinning, although operational across North Ayrshire.
The service provides community-based advocacy to children and young people ensuring that they are aware of their rights
as defined within the United Nations Convention on the Rights of the Child (UNCRC). Hear 4u is funded by North Ayrshire
Health & Social Care Partnership. Priority is given to children and young people who: 
• Are involved in the child protection process and/or children’s hearing system. 
• Are Care Experienced in Foster Care, Residential Care and/or Kinship Care. 
• Are on the periphery of Secure Care 
• Were previously looked after and accommodated 
• Have additional support needs 
11 Implement learning and
improvements identified through the
HSCP SDS Learning Review Board
for the Children with a Disabilities
Team. 
Phase 2 of this work is commencing in April 2024.  There are eight priority areas for action that are being taken forward in
partnership with Horizons Research.
12 Include young carers in the planning
and shaping of their services. 
Young Carers are a core partner in the Joint Youth Forum network where they contribute to planning and shaping future
plans and polices for both North Ayrshire and nationally. Needs are met through collaboration with young people when they
complete the Young Carer's Statement.
13 Develop a young people users forum
for KA Leisure and ensure their views
and opinions are considered when
developing programmes and
initiatives. 
KA Leisure has engaged with North Ayrshire Council’s Youth Services to explore a range of options to better engage young
people in the decision-making for leisure and sport provision.  A new Youth Forum will be established in 2024 which will
encourage young people across our communities to share their views. Active Schools continue to support KA to gather the
views of young people to help influence future planning. 
165

Page 166

3 
Acting early to improve what happens next
No.  Action  Update 2023-24
14 Work with our partners to keep all
children and young people safe, with
the robust implementation of the new
National Guidance for Child Protection. 
An implementation group has been set up and is chaired by a Senior Manager. This was a multiagency group with all core
partners represented, Health, Police Scotland, Education, Social Work Services, SCRA. A series of briefings were
developed on the new guidance to assist staff to be prepared on the changes, e.g. Child Protection registration changes,
changes to IRD. These were designed to assist frontline staff to be prepared and informed of the new expectations.
Feedback from Pan Ayrshire services was very positive about how helpful the briefings were in preparing the workforce. The
guidance was implemented in September 2023 within specified timeframe. Example of briefing included. 
The ongoing impact of the new guidance e.g. length of registration, inclusion of non- familial harm and numbers of IRD will
require close monitoring via CPC to ensure all services work together effectively to keep children and young people safe.
15 Support families with children aged 0-5
through our integrated universal early
years’ service. 
Within North Ayrshire, we continue to offer all families support from a multi-disciplinary, integrated UEY service.  All children
in North Ayrshire have access to the full Universal Health Visiting Pathway which consists of a minimum of 11 Health Visitor
visits from the ante-natal period to the pre-school assessment when a child is 4 years old.  For younger parents, under the
age of 21 years, they can opt-in to the Family Nurse Partnership (FNP) programme which provides more intensive and
targeted support.  The multi-disciplinary team consists of Health Visitors, Family Nurses, Early Years Social Workers, Health
Visiting Support Workers, Family Nurturers, Perinatal Mental Health Nurses, Community Infant Feeding Nurses, and, during
2023/24 has been expanded to include a dedicated Dads’ worker in partnership with national charity Dads Rock.  965
families have been supported by the team during this last year.  In addition, the wider team of support across the NHS, local
authority and third sector organisations including services such as Speech and Language Therapy, Occupational Therapy
and Paediatrics received 980 Requests for Assistance for children under the age of 5 years old in the last 12 months.  In
total, 1945 children and their families have received additional support from a range of early years’ services.  The service
also receives notifications from services such as Police Scotland, NHS 24, NHS Ayrshire and Arran Emergency Department,
housing (homelessness), North Ayrshire Drug and Alcohol Recovery Service (NADARS) and Paediatrics/ Paediatric in-
patients where information pertaining to a child requires to be shared.  During 2023/24, 2436 notifications were received
from these agencies/ services and were shared with Health Visitors/ Family Nurses to support a holistic assessment of a
child’s needs.
16 Increase access to early learning and
childcare. 
A review of North Ayrshire Council’s early learning and childcare provision has been undertaken within this reporting period.
Data on uptake and engagement with staff and families accessing the service has informed a reconfiguration of delivery
models. Families continue to be offered flexibility across each locality to access a full year or term time placement and a
range of attendance patterns to suit their needs at a Council establishment, funded provider, or a blended placement.
Reconfigured models, which will be introduced from August 2024, will enable the service to be delivered in a reduced budget
envelope while ensuring a greater number of children are able to access their full entitlement of up to 1140hours of free early
learning and childcare from North Ayrshire Council.
17 Work together with parents or carers to
provide support to their children. 
During this reporting period, education establishments have continued to offer a range of family learning opportunities,
despite the closure of the Scottish Attainment Challenge funded family learning team due to funding reductions. Family
166

Page 167

4 
learning and parental involvement and engagement continue to be core component across all education provisions with the
service ready to implement the Learning Together National Action Plan once this is published by Scottish Government.
18 Improve outcomes for care-
experienced young people. 
The Police Scotland Youth Volunteering scheme in North Ayrshire builds life skills, enhances confidence and provide a
supportive platform for the young people to move on to the next stage in their lives. It seeks to support care experienced
young people in this programme to contribute to achieving better outcomes for them.  Within North Ayrshire there are 27
members.  They were involved with events such as the Marymass Festival in Irvine where they supported the police in
looking after and reporting lost property and helped at the various poppy appeals.  We have developed the corporate
parenting Steering Group, chaired by an elected member and attended by Heads of Service and Senior managers from
across the Community Planning Partnership. This group meets once every three months. 
We have also developed a Promise Operational Group (PrOG) that meets every 2 months and is chaired by a Head of
Service and is attended by front line mangers from across the Partnership and has four working groups. These are Data,
Language and Communication, Alternative care, and Relationships.  We have established a Champions Board network of
over 30 care experienced young people that we are currently taking forward so they can have a voice in their care and
policies that affect them.
19 We continue to develop and implement
the Childsmile programme, focussing
on early referral and preventive advice
for all families. 
We continue to implement the Childsmile programme on an Ayrshire wide basis, promoting early referral from a range of
services and supporting access to dental care. At this time, we do not have any specific programmes of work only for North
Ayrshire. Over the past 2 years we have introduced a programme to offer 3-year-old children living in any A&A SIMD 1
postcode who are not registered with a dentist with a Dental Health Support Worker to promote access to services. An oral
health needs assessment for Ayrshire and Arran has recently been completed and an action plan will be developed to
address the needs identified via this. 
20 We will continue to deliver Jumpstart, a
family centred healthy lifestyle
programme for children aged 2-17,
who are above a healthy weight. 
The Child Healthy Weight team continued to support children and their families to achieve a healthy weight via the Jumpstart
programme. The programme works with families with children aged 5 to 17 years old. During 2023/24, 55 children and their
families were referred to JumpStart (5 to 17 programme). The referrals were split evenly between males and females with 28
males (51%) and 27 females (49%). Of the 55 children referred, 29 children (53%) were aged 5 to 9 years old, 19 children
(34%) were aged 10 to 13 years old and 7 young people (13%) aged 14 to 17 years old. 
21 Expand our peer support service to all
breastfeeding mothers as part of our
integrated infant feeding service
working alongside the Breastfeeding
Network. 
NHS Ayrshire & Arran continued to work in partnership with the Breastfeeding Network to provide mother to mother peer
support to breastfeeding mothers. Between April and October 2023, the service was offered to all first-time mothers who
were breastfeeding on discharge from Ayrshire Maternity Unit. The latest data available is for mothers who received peer
support until September 2023. Across Ayrshire, 85% of mothers took up the offer of peer support; 35% of those mothers
were from North Ayrshire. At 6-8 weeks 48% of the mothers from North Ayrshire were exclusively breastfeeding their baby,
while 26% of mothers were giving a mix of infant formula and breastmilk. In November 2023, the service expanded to offer
peer support to all breastfeeding mothers.
22 Continue working with whole families,
whole systems and whole communities
to provide early intervention support to
all of North Ayrshires Children. 
Connected communities have established groups including young parents Group and Take Time families that looks at whole
family support focussing on wellbeing, connections and resilience.
167

Page 168

5 
23 Providing training/guidance to families,
schools, partners and communities
that enhances the understanding of
early intervention and provides skills
needed for families to feel confident
and equipped to manage family life. 
Early intervention remains a key priority in supporting families to feel equipped to manage family life. A whole system
approach is adopted across North Ayrshire Council and partner agencies in responding to need. This ranges from universal
support provided by education staff and education’s area inclusion workers to targeted interventions of the Health and Social
Care Partnership’s whole family wellbeing team as well as approaches delivered by partner organisations such as the
Sustain North Ayrshire (Aberlour) project.
24 We will implement the Signs of Safety
approach to social work practice. 
Health and Social Care have begun the implementation of the ‘Signs of Safety’ assessment and planning model. This model
places parents, children and everyone naturally connected to the child at the centre of the assessment, decision-making and
planning and is a significant paradigm shift for children’s services, where the dominant culture is for professionals to define
the problems and what is required to solve them.
We went fully live with Signs of Safety for all new cases in September for Children and Families Locality teams and the Child
Protection team. Prior to then we had a period from June where we used the approach with a small amount of practice in
order to build workforce confidence and knowledge. Since then, we have utilised this practice framework with over 250
children and young people This is great progress, but we recognise there is ongoing work to build all our confidence in
establishing the approach. Further details are contained in the main report.   
25 Improve planning for transitions of care
to ensure children and young people
are able to thrive moving into
adulthood. 
Three reports have been compiled over 2023/24 covering the experiences of workforce, children and young people and
families of transitions.  These reports are currently being considered alongside the extreme team work in learning
disabilities.  The aim is to support more person-centred services where structural barriers are eliminated wherever possible.
26 Invest in premises infrastructure to
support children and young people
experiencing distress in appropriate
environments. 
We have received some limited capital funding from Scottish Government as part of our “affiliate status” on our journey to
deliver a Bairns Hoose in Ayrshire.  We have used the funding to improve our facilities where child victims or witnesses are
taken to be Joint interviewed by Social Work and Police. 
Our drive was to create a safe and warm, nurturing, welcoming space for children and young people to feel comfortable
when being joint interviewed. The project has been progressing over the past few months and has been a real community
initiative involving different elements of the HSCP. Police and Social Work have collaborated for the rejuvenation of the
spaces, whilst our unpaid work team have helped to fill and paint both rooms and build furniture. It is hoped that both spaces
will be ready soon once all furniture has been built and placed. Local businesses have also been used to furnish the rooms
with fresh carpets to add a homely feel to the spaces. 
27 Work across partners to develop
robust pathways of support for infants,
children and young people and their
families seeking support for speech,
language and communication
development support. 
We advise anyone who is worried about a child’s speech, language or communication development and considering a
referral to contact our service via our weekly Helpline and speak directly to an experienced Speech and Language Therapist
(SLT) to discuss their concerns and identify the child’s needs. We know that for many children the most effective way to
support their development is by empowering the people who are communicating with them on a daily basis at home or in
their school or nursery. Therefore an essential part of our support for families and other professionals is provided via the
Helpline support and also Drop-In appointments when our SLTs provide advice and resources to support parents and staff
working with the children depending on the child’s needs. 
These supports include linking with the communication champion in nursery or teacher in school, adapting the environment
in nursery or school using a communication friendly approach, making sure the team around the child know how best to help
them, providing families with links to helpful resources as well as topic specific webinars and drop-in appointments. Children
168

Page 169

6 
Making things fairer
No.  Action Update 2023-24
32 Implement the North Ayrshire Child
Poverty Action Plan. 
The child poverty action plan continues to focus on reducing child poverty. 
33 Improve attainment and achievement
for all. 
The recent School Leaver Destination Report (SLDR) was published in February 2024, reporting North Ayrshire has the
highest level of destinations reported and was delivering results above the Scottish average and is ranked as 8th highest in
Scotland, work will continue to support school leavers and their families.  MCR Pathways mentoring programmes have been
introduced in a further two secondary schools meaning that all eight mainland secondary schools now have access to this
provision, specifically to support positive outcomes for care experienced learners through regular mentoring with adult
mentors from the local business community. These programmes have been evaluated highly by care experienced learners
at our recent care experienced joint cabinet live event. 
are therefore only added to our waiting list when there is a difficulty that requires an SLT assessment.  We make sure we
provide ongoing support for families and staff while children are on the waiting list by encouraging them to continue to
access support using the drop-in clinics or helpline.
28 Improve access to Speech and
Language therapy for children and
young people who require specialist
support. 
Data collected at the end of March 2024 confirms there were 86 children on our waiting list with an average waiting time of
79 weeks. It is projected that at the end of April 2024 there will be 82 children waiting with an average wait of 26 weeks. 
29 Develop a trauma informed workforce
by rolling out trauma aware and
trauma skilled resources. 
The Trauma Informed Lead Officer was appointed in April 2024 and is currently designing a training offer as the first step.  
30 Develop an evaluation framework to
maximise resources to support
children and young people, to enable
system partners to invest and sustain
early intervention approaches. 
As part of North Ayrshire’s approach to the Whole Family Wellbeing Fund, a monitoring and evaluation framework was
established to support implementation and to ensure spend mirrored the aims and objectives of the Fund.  The framework
has been modified since being developed with all funded proposals now only expected to provide 6 monthly monitoring
reports showing impact, progress towards WFWF aims and outcomes, targeting of priority groups, good practice and
challenge amongst other things.  There is no longer a requirement for an end of year evaluation, except for the final year of
the Fund in 2026.  In addition, all funded proposals have completed a Children’s Rights Impact Assessment (CRIA).
31 Reach and identify all young carers
earlier in their caring role and promote
increased uptake of Young People’s
Carer Support Plans. 
The HSCP increased its investment in carer services threefold in 2023 through the recommissioning of the Carers Support
Service – now the Carers Gateway.  This has seen early indications of increased young carers registrations as well as an
increase in support activity based around reducing social isolation. 
This session Young Carers have completed 400 statements. This is approx. 93% of all Young Carers registered on school
systems. Education and HSCP delivered a Young Carers Statement workshop for 27 staff at the Professional Learning
Academy the feedback from staff was positive and contributes to building the skills within our teams of staff to support Young
Carers across North Ayrshire.
169

Page 170

7 
34 Close the poverty related attainment
gap. 
Planning continues for the further roll out of universal free school meals to primary six & seven pupils.  This includes
modelling of staff resources, kitchen capacities, equipment, and capital work requirements.  We work closely with Education
and Property Management and Investment to plan and progress capital works.  The first phase of the capital work has been
completed. 
We provided a free breakfast for all secondary pupils over the winter months. School holiday meals programme delivered
across 17 sites. 
Schools have been implementing various initiatives and interventions using the Pupil Equity Fund, while local authority
support through the Scottish Attainment Challenge has been streamlined. 
All schools are aware of the Child Poverty Action Group (CPAG) COSD toolkit. Reducing the COSD is a priority across all
educational establishments and measures are in place to support children and families. This includes the purchase of Digital
learning devices for children, access to free school uniforms, access to free healthy snacks, support towards residential trips,
after school clubs and sporting activities. Fundraising in schools is not requested via staff and is only arranged through
Parent councils to support opportunities for children, where it is handled sensitively and in a non-mandatory manner.
Scottish Government also support free bus travel, free school meals, and clothing grants, etc. 
Schools with best practice have removed and others have significantly reduced the cost of school day. There is a £150,000
recurring investment in extending our school and community food network across all schools to support children and
families. There is a £100,000 recurring investment in a School and Family PB Investment Fund for educational
establishments to respond to local needs in relation to school uniforms, outdoor clothing, sports kit and recycling and reuse
equipment.
35 Implement the recommendations from
the Independent Care Review
(Scotland), The Promise. 
A Steering Group and Promise Operational Group (PrOG) have been established to ensure consistency and involvement
across the Partnership at a strategic and operational level. The Promise Operational Group is attended by operational staff.
There are four PrOG sub-groups. These are: 
1. Communication and Language 
2. Alternative Care 
3. Relationships 
4. Data Mapping 
36 Implement the recommendations from
the Additional Support for Learning
Review (Scotland). 
The Supporting Needs Review has been running since December 2021 and will conclude in June 2024.
37 Build strong collaborative
partnerships in local areas to ensure
we deliver high-quality services for all
of our children, young people, and
families. 
The Rosemount Project and Family Centred Wellbeing Service are also proactive in signposting and/or making referrals to
Money Matters to ensure that families’ benefits and income is maximised. The team would also liaise with Money Matters to
support appeals if access to benefits, such as, the Scottish Welfare Fund, or Child/Adult Disability Payment is refused. 
38 Create a new 3 year Raising
Attainment Strategy. 
This will be part of the Education Service Improvement Plan 2024-25.
170

Page 171

8 
39 Maximise opportunities to work with
Third Sector providers to provide
early intervention and prevention
supports, with a particular focus on
primary prevention approaches. 
Through the Whole Family Wellbeing Fund, third sector organisations have been engaged in the transformational activity
required to support holistic family support, shift focus to early intervention and prevention and work towards the aspirations
of The Promise. In 2023 6 organisations shared £30,000, engaging with 657 members of the community, many of the
programmes used outdoor activities and nature to promote positive mental wellbeing. A further 8 organisations have
successfully bid for a share of £25,000 in 2024.
40 Providing a robust ‘peer’ support
model that upskills parents and
carers, providing training and
volunteering opportunities and
enhances employability skills as well
as building self-esteem and
confidence. 
In 2023/24, the Employability service has registered 660 new parents who are engaging, developing skills, confidence, and
resilience to secure and sustain employment in the future.   
In this period 80 parents have secured paid work experience through placements in third sector organisations, the council
and 50 more have progressed into employment, with 130 more families in employment with increased household income this
will contribute directly to addressing child poverty.   Worked with The Lennox Partnership, Employability team, Ayrshire
College, TACT and KA Leisure to provide a six-week Step Into Wellbeing Summer programme to help parents build
confidence, upskill and move into work. Childcare provided by Out of School Care services to allow parents to attend.
Programme will run again this Summer.
41 Take an asset-based approach to
communities/children and families
and build upon the skills and
strengths that exist. 
Health and Social Care have begun the implementation of the ‘Signs of Safety’ assessment and planning model. Children
and Families Locality and CP teams have utilised a number of positive approaches to support and embed practice - e.g.
Signs of Safety team support sessions, sharing of anonymised tools and examples via practice channels on Teams, shared
drives. These strategies have created safe spaces for the workforce to share ideas, ask questions, raise challenges, and get
both peer and managers’ support. 
42 Establish a Financial Inclusion
Partnership in North Ayrshire to better
support access to support for families. 
A Financial Inclusion Partnership has been established with 28 partners from various organisations. Key actions for the
group include:
Interactive map of advice services
• Communications Working Group
• Fuel Poverty sub-group
• Co-produced training calendar
• Financial Inclusion Conference
Health visitors from within the universal early years have supported a further 25 families to maximise their income through
referrals to Money Matters, Lemon Aid, CHAP and Home Energy Scotland.  Customer services teams continue to ensure
that family’s needs are supported financially via the administration of benefits including the Scottish Welfare Fund, Education
Maintenance Allowance, Free School Meals, School Clothing Grants, Housing Benefit, Council Tax Reduction, Discretionary
Housing Payments and Energy Support Crisis Payment.  The processes for these are as seamless as possible for the
customer to apply and where possible, automation is in place. 
43 Develop peer support models.  Connected communities Modern Apprenticeship programme enhances delivery for young people by developing a peer led
model of delivery in youth work, whilst on the job learning these MAs are an integral part of delivering a range of
opportunities, engaging their peers in consultation and youth voice as well as a large selection of youth opportunities.
44 Strive for parity of access to support
and services for our Island
Communities including for Children
and Young People. 
Youth participation opportunities are open to all young people on our islands with access to Joint cabinet, Joint Youth Forum,
executive youth council and Primary 7 youth council.  Allocated spaces for young people on islands are provided for all of
these events and activities.
171

Page 172

9 
45 Provide multiple points of access for
young carers into carer support
services. 
Work with colleagues in Education remains a positive experience in relation to the identification of young carers in addition to
the work of the Carers Gateway.
Through completion of Young Carer's statements Young carers have identified individual supports. Unity Carers have
expanded their team to provide direct support to our Young Carers. The Young Carers Co-ordinator is supported by 4
Support Officers allocated to localities. They are liaising with school staff and collaborating, particularly around transitions
and access to funding opportunities. The Support Officers are raising awareness of carer support services to encourage
engagement. 
Promoting good mental health and wellbeing
No.  Action  Update 2023-24
46 Develop our nurturing approach
across all Children’s Services. 
Currently moving from targeted nurture to Whole School Nurture, this will be implemented through a robust Professional
Learning approach and will feature in Establishment Improvement Plans over session 2024-25
47 Work with children, young people,
families, and communities to improve
mental health and wellbeing through
physical activity and social
participation. 
The Out and About project in the Garnock Valley, encouraged families to use the assets in their local area and to spend
family time together. Based on partner feedback a programme of Saturday morning events was funded in the Garnock
Valley libraries in the run up to the summer holidays in 2023. Families identified by the Family Care Workers have also
benefited from KA Leisure memberships to support them to continue to get out and about. They have also been gifted
experience kits which includes a range of items and activity ideas for families to enjoy both indoors and outdoors. The Little
Free Library was launched at Lochshore Park, Glengarnock with environmental-themed books for children and families to
use on site or borrow as part of the project.
Connected Communities Mental health and Wellbeing have a variety of early intervention, positive wellbeing, resilience and
confidence building events and activities.  These are for age 5-25 year olds, including whole family approaches, work in
schools and communities.  This varies from drama, accredited programmes, outdoor learning, roadshows, murals, climate
engagement and young parents.
Active Schools continue to support all schools to deliver high quality extra-curricular programmes across Primary, Secondary
and ASN schools. Our top 5 participation sports are Football, Netball, Multisport, Basketball and Dance. The Active Schools
events calendars are nearing completion. Events have been run across the academic year within individual/cross localities,
and North Ayrshire wide events. This targets all schools as well as Lockhart. Additionally, we link with Ayrshire Sports Ability
and Scottish Disability Sport to complement our ASN calendar to provide more bespoke events.
Active Schools continues to support over 50 sport and physical activity clubs across the academic year to deliver within our
school settings. This includes the co-ordination of the delivery of weekly sessions, health week inputs, full day delivery and
promotional distribution.
48 Continue to have appropriate
pathways in place for supporting
mental wellbeing. 
The funding via the Children and Young People's Community Mental Health Supports and Services Framework continues to
provide multiple community-based services for children, young people and families. 2 key projects that have made a
difference are our 2 MHWB Project Delivery Officers (PDOs) and our Family Centred Wellbeing Support Service (FCWS).
Our MHWB PDOs have engaged with 3671 children, young people and families since July 2023, activities include running
Take Time Families sessions at Kilwinning Library, delivering 'Your Resilience' workshops in Secondary Schools and
172

Page 173

10 
Ayrshire College. They have further developed the Mini- MHAmbassador Programme in Primary schools and have started a
Young Parents group. Feedback has been positive, with one young parent describing the group as a "Lifeline", access to the
group has helped to combat loneliness some new parents had described. An example of teacher's views of the Mini-MH
Ambassador Programme is “The key points from the Programme that really supported the class were to think about what
people are like on the inside be positive and kind, and resilience in having real life scenarios to work through" The children
said, "You all helped me realise not to care so much about what others think, ....... I have learned to believe in myself and to
try and stop doubting myself if I fail".
49 Work together with children, young
people, and their families to help build
resilience. 
We have continued to roll out our Building on Positive Relationships Families Programme, with 20 families completing the
programme. We have trained our Area Inclusion Workers, the Family Centred Wellbeing Support Workers and some of the
Rosemount team to deliver sessions, there is further training organised for June 2024. Of the 10 parents/carers who have
completed evaluations 90% agree/strongly agree that the relationship between themselves and their child has improved.
100% have found the sessions useful, comments from parents/carers include "I feel that I have benefitted from being around
other parents and heard how they managed. I have heard their views and their support and leaders support has helped me
feel able to put things in place and "I have learned tools to de-escalate myself and my child."
50 Improve services for children with
neuro-developmental conditions,
implementing a whole system
approach with partners across Health,
Education, Social Services and the
Third Sector. (Implementation of the
National CAMHS and
Neurodevelopmental Specifications). 
The CAMHS specification came into operation on the 1st August 2023 and with that, the national neurodevelopmental
service specification.  In North Ayrshire, a North Ayrshire CYP Neurodevelopmental Service Specification Implementation
Group was established in June to take forward key aspects of the service specification.  For update on specific progress
activities please refer to the main Performance report. 
51 Public Health will implement a life
course approach to Mental Health
and Wellbeing, focusing on the first
thousand and one days, infancy and
Children and Young People. 
During 2023/2024 the Public Health Department published a chapter of the Director of Public Health Annual Report titled
“Director of Public Health A Life-Course Approach to Understanding Mental Health Report”. The main aim of progressing a
life-course approach to mental health will involve maximising the many opportunities to promote mental health and wellbeing
across all of the life stages, through preventive approaches and timely access and intervention/support for people where a
mental health need and mental illness/disorder presents. This will require a whole system approach, recognising and
acknowledging current work and success, and building on this for future developments. 
Over the coming year Public Health will continue to identify opportunities to have dialogue with colleagues and partners
working in areas including children’s and mental health services regarding the life course approach. 
Examples of Public Health Department activity in the previous year includes: 
• Delivery of “Mental Health Improvement – a practical approach” to colleagues and partners working with infants, children
and young people (i.e. Education, those working with non-attenders at school, community groups) 
• Promotion and provision of Children and Young People’s Guide to Mental Health and Wellbeing among other resources
• Support for a whole school approach to mental health and wellbeing. 
52 Establish a Community Planning
Partnership led Health and Wellbeing
Alliance to bring key partners together
Established in December 2022, North Ayrshire’s Health & Wellbeing Alliance builds on the existing efforts of partners across
North Ayrshire to develop the strategic vision of the wellbeing agenda in North Ayrshire. 
173

Page 174

11 
to co-ordinate approach to targeting
support to improve individual, family
and community health and wellbeing. 
This involves building upon our well-established, sector leading, Health and Wellbeing Service, and accelerating our
responsive, needs based, service led model. Utilising physical activity as an intervention to support public health, address
and manage health conditions, engage with communities, and reduce inequalities.  To address the challenges we are facing,
our radical approach presents a real opportunity to reimagine leisure services to deliver a greater health and wellbeing
impact.
The North Ayrshire Wellbeing Alliance will provide a multi-level leadership body in the development and delivery of the Local
Outcome Improvement Plan (LOIP) 2022 for North Ayrshire Community Planning Partnership (NACPP).  Commencing in
June 2023 a series of engagement activities has been underway and in October we presented our findings to the Steering
Group from the engagement phase. This included representing hundreds of contributions through workshops and focus
groups.  We followed up by sharing this information with the wider group of people and organisations associated with the
alliance on 05 March 2024. You can view the paper here.  To support the paper we created a short explainer animation. You
can view this here.
53 Build on services that encourage
parenting skills and interactions with
between family members. 
The integrated early years team empower and enable parents and carers to support their child in a range of areas.  During
2023/24, 965 Requests for Assistance (RfA) from the wider integrated team were received. 527 Requests for Assistance
(55%) were made to the Health Visiting Support Workers to support parents with topics such as communication, behaviour,
sleep, weaning and toileting.  11% (n=103) were made to the Family Nurturers for support with home conditions, community
integration, and bonding and attachment. 11% (n=105) were made to the Perinatal Wellbeing Team for support with
maternal mental health difficulties during pregnancy or in the initial 9 months following the birth of a child.  7% were made to
the Early Years Social Workers for support with parental mental health, relationship issues and home conditions.  Through
the Whole Family Wellbeing Fund we have worked with national charity Dads Rock to bring in a Dads Support Worker to
support dads and other male caregivers with children in the early years with practical parenting skills, empowerment and
confidence in their role as dad.  One to one support, as well as group support is being provided by the worker and there is
also a review of current processes within UEY to ensure inclusivity to dads, and not just mums.
The Health Visiting Support Workers within UEY assist colleagues in Education to deliver parenting programmes, such as
Incredible Years, in a group setting.
54 Build on the National CAMHS
Specification through the 3
established pathways (core,
unscheduled care, neuro), ensuring
young people are on the correct
pathway at a much earlier stage. 
All three aspects of the service are fully operational, Referral to Treatment Time (RTT) for CAMHS is presently 3 weeks.  
55 Continue to provide ‘worry workshops’
e.g. identifying key issues raised as
worries by North Ayrshire children
and young people and using this to
develop targeted workshops on these
issues. 
The activity mentioned in this action has been replaced by other programmes and supports. 
174

Page 175

12 
56 Be responsive and pro-active in
responding to and learning from
Young Person’s Suicide through our
Young People’s Suicide Prevention
Taskforce. 
The Young Person’s Suicide Prevention Task force is currently reviewing their Crisis Response Plan to identify what has
worked well, highlight any gaps and identify actionable areas for continuous improvement.  The Young Person’s Suicide
Prevention Task force is currently mapping out all supports available to young people and ensuring that supports are in
place for school holiday periods when the young people are not in school and can be more vulnerable.  
57 Deliver the new National Secure
Adolescent Inpatient Secure Unit
(Foxgrove) for children across
Scotland, which will also benefit
young people in North Ayrshire. 
Foxgrove is not yet operational and steps are being taken for the completion of the building and handover to take place in
the coming months. The workforce remain deployed in other NHS Ayrshire and Arran services and training and induction is
progressing to reduce the preparatory time once the building is complete.  
58 Explore opportunities to ensure young
people are not admitted to non-
specialist environments including
options to develop and in-house
CAMHS inpatient provision. 
The expansion of the CAMHS Unscheduled Care Service CUAIT has extended its operational working hours to 8am to
8.30pm seven days per week.  There has been a concurrent reduction in the use of beds at Skye House since the
introduction of the service and there have been no reported cases of young people recorded as admitted to adult Acute
Wards or Adult IPCU’s.  
59 Building on the success of the
Kilwinning Wellness Model, the
Revised Wellness Model working
group will now seek to roll out the
approach across all North Ayrshire
localities. 
The Revised Wellness Model has now been rolled out to the Irvine locality and has been refreshed in the Kilwinning and
Largs localities. Both education and Primary Health care staff describe the improved communication between the two as
having a positive impact on the children and young people. There are plans in place to roll out to the Garnock Valley next.
60 Enable young carers to have a quality
of life outside caring and ensure
support when moving through key life
stages. 
North Ayrshire Young Carers fund is available and can be accessed by Education staff for any young person in North
Ayrshire who is identified and recorded as a Young Carer with
a completed Young Carers Statement.  It can be used for anything that will improve or maintain the young person’s physical,
emotional mental health and wellbeing or life chances, reduce social isolation, attainment at school or in their community the
same as non-caring peers. Examples of how the funding has been used include providing money for driving lessons, the
purchase of ice skates and an annual cinema pass. 
Inspiring children and young people to be active
No.  Action Update 2023/24
61 Create innovative physical activity
and sports opportunities with
communities and partners. 
KA Leisure has continued to engage with partners to remove financial barriers to sport and physical activity in our
communities.  This includes both the cost of participation or clothing and equipment.  Working with partners we have
distributed 359 memberships in 2023.  This has supported individuals identified to services where finance may inhibit their
ability to take part in leisure services.  We have also continued to collect clothing and recycling it for partners clients, local
clubs or our communities. We also shared various campaigns and messaging to raise the profile of our concessional
scheme Access Plus.  This provides lower prices on a membership or concessional rate to our facilities and activities.  We
have offered free swimming and skating during the holiday period to 0-17 year olds.  This was supported by funding from
175

Page 176

13 
North Ayrshire Council. We have also progressed the development of North Ayrshire’s new Wellbeing Alliance.  Its aim is to
bring different people and organisations together to develop inventive ways of working together that give people in our
opportunities to live the life they want.  Collaborating through the lens of a whole systems approach, the Alliance builds on
the existing efforts of partners across North Ayrshire to develop the strategic vision of the wellbeing agenda in North
Ayrshire. Our radical approach presents real opportunity to reimagine traditional leisure services to deliver a greater health
and wellbeing impact. Utilising physical activity as an intervention to support public health, address and manage health
conditions, engage with communities, and reduce inequalities. 
The work of the ASCPO’s continues with a focus on care experience young people, inactive and those on the cusp. All
Secondary schools have received experiential opportunities for targeted young people. On completion of the above the team
have been providing support for the attendees into more frequent activity as well as community club provision. Furthermore,
the team have continued to work across the HSCP to provide support to the work of the Promise. Our Third sector work has
also continued with a focus on teenage provision. ASN has been a focus as well across Lockhart and primary schools who
have bases as part of their mainstream settings.
62 Adopt a whole systems approach to
diet and healthy weight. 
The team have worked closely with a number of partners including Ayrshire College to raise awareness of early years
nutrition and child healthy weight. This pilot work within the North Ayrshire campus focused on training all early years
students to increase knowledge, skills as well as awareness of local supporting services and resources. During Jan – March
24 the team trained 89 students. In addition the team have also participated in a service wide education event with health
visiting to update on topical issues around infant and early years nutrition. We have also had the opportunity to give an
update on early years child healthy weight programmes at head teachers event in February 2024. 
In partnership with the Public Health Department, the team have been able to commission HENRY (Healthy Eating and
Nutrition in the Really Young) core training programme to a variety of partners which contributes both to maternal and infant
nutrition and child healthy weight programmes. This training has a strong foundation in health behaviour change thus skilling
participants to take a strengths-based approach to supporting families.  Over 2023/24 there have been 7 cohorts of training
with over 100 participants, including health visitors, school nursing, maternity staff, early years practitioners, oral health and
allied health professionals.    
63 Design opportunities into the whole
system to enable children, young
people, and their families to access
supported physical activity
opportunities and have a healthy
lifestyle. 
Active Schools continue to support all schools to deliver high quality extra-curricular programmes across Primary, Secondary
and ASN schools. Our top 5 participation sports are Football, Netball, Multisport, Basketball and Dance. 
The Active Schools events calendars are nearing completion. Events have been run across the academic year within
individual/cross localities, and North Ayrshire wide events. This targets all schools as well as Lockhart. Additionally, we link
with Ayrshire Sports Ability and Scottish Disability Sport to complement our ASN calendar to provide more bespoke events.
64 Ensure all our early years indoor and
outdoor learning environments and
activities enable children to be
physically active. 
Significant investment was made in North Ayrshire Council’s early learning and childcare estate as part of the expansion of
the national commitment to delivering up to 1140hours of funded early learning and childcare for all eligible 2 – 5 year olds.
Work has continued during this reporting period to deliver effective learning environments that enable children to have the
best start in life.
65 Promote access to leisure services for
children and young people to
KA Leisure continues to deliver a range of innovative marketing campaigns to promote our services to a range of user
groups.  We have also engaged with a variety of partners and services to provide seamless access for the children and
young people they support.
176

Page 177

14 
encourage participation in physical
activities. 
66 Promote the introduction of the
INSPIRE programme to improve
opportunities for alternative activities,
including arts, drama and music. 
The Active Schools team continue to distribute information promoting the INSPIRE membership as well as support partners
such as HSCP/Extended outreach to purchase these for their client groups.
67 Create and protect safe spaces for
children to play and enjoy being
outdoors. 
An early years outdoor science resource was developed, led by our STEM team. The purpose of this was to link outdoor
learning experiences to Science experiences and outcomes and Sustainable Development Goals. Professional learning
sessions for this resource were attended by 215 practitioners. Evaluations were completed by practitioners following the
training, 100% of whom agreed that using the resource has helped them to make links between outdoor learning and
science experiences and outcomes, and that this would improve and extend the quality of outdoor learning experiences.
Over 100 staff attended further professional learning on outdoor learning and learning for sustainability for primary-aged
children. In addition, whole-school training sessions have been delivered in three schools and the STEM team has supported
a further three schools through outdoor learning team teaching inputs. 
68 Support parents to understand the
importance of movement and
enjoyment for children and young
people. 
Through a wide range of programmes and contacts, many families have benefited from KA Leisure memberships to support
them to continue to get out and about. To many families this would otherwise be cost prohibitive. Some families have also
been gifted experience kits which includes a range of items and activity ideas for families to enjoy both indoors and outdoors.
Within health visiting we utilise the national Play@Home resources (Baby, Toddler and Pre-school) to advocate the
importance of play.  Play-based approaches are also used to support work to improve bonding and attachment;
communication; and any support for gross motor skill development. 
The Family Centred Wellbeing Team hosted a fun day in July 2023. The focus was on promoting health and wellbeing for
families. In partnership with Active Schools, various physical activities were facilitated including archery, throwing, tennis and
football for children and their families to take part in. 
69 Work with local small business/
fitness team to provide access to
activity and nutrition information. 
Bespoke gym programmes between schools and the ASCPO have been developed with ‘Better U fitness’ to support some of
our targeted young people to be more activity in their own community setting. 6 – 12 weeks programmes, continue to be
delivered and supports these young people back into school. Nutritional information is given throughout this programme. The
ASCPO’s have also supported KA Leisure on the roll out of the Elevate gym programme with a variety of schools and non-
school groups.
70 Creation of new and local growing
spaces to support communities to
grow foods, to upskills families,
enhance family time and connection. 
Connected Communities mental health and wellbeing ambassadors alongside the Climate Change ambassadors have
worked to create green spaces for young people to engage in nature and to plant within community gardens.
71 Ensure all primary, secondary and
ASN schools are provided with quality
extra-curricular opportunities in sport
and physical activity that are open to
all. 
Active Schools continue to support all schools to deliver high quality extra-curricular programmes across Primary, Secondary
and ASN schools. Our top 5 participation sports are Football, Netball, Multisport, Basketball and Dance. 
The Active Schools events calendars are nearing completion. Events have been run across the academic year within
individual/cross localities, and North Ayrshire wide events. This targets all schools as well as Lockhart. Additionally, we link
with Ayrshire Sports Ability and Scottish Disability Sport to complement our ASN calendar to provide more bespoke events.
177

Page 178

15 
72 Ensure all young people have the
opportunity to compete and perform
regardless of what level they are at. 
We are very proud of the number of distinct participants we are engaging with during extracurricular. 9,425 young people
have attended a variety of sport and physical activity sessions across 22-23, over 53% of the whole young people
population. Nearly 9,000 individual sessions were delivered to achieve that number with 91,246 visits being made. 98% of
delivery of our sessions were delivered by volunteers – one of the highest across Scotland. 
73 Create and support a school to
community club pathway for sport
across North Ayrshire. 
Last academic year Active Schools supported 51 North Ayrshire clubs to engage in schools. Clubs delivered the following:
• Curriculum enhancement sessions (PE slots over and above the schools 2 hours of PE)
• Health week sessions
• One off days in schools
• Visits to the club
• Promotion of club through distribution of flyers 
Furthermore, the progression of our North Ayrshire Community Sport Hub has gone from strength to strength. In joint
partnership with KA we have been supporting clubs with training, venues and one to one development sessions. In
collaboration with selected affiliated clubs, we have been supporting the delivery of satellite clubs to encourage more
localised participation. 
74 Ensure an effective leadership
pathway is developed for P6 through
to S6 and beyond to develop
transferable skills. 
We have robust leadership pathway from P6 to S6 and beyond. Our P6/7 programme Move and Improve has 946 young
people who have completed their training. Our Young Ambassador programme bolsters 118 young people from all 9
secondary schools and ASN School. Our flagship North Ayrshire Sports Academy had 189 young people as part of the
programme, and they gained on average 12- 15 qualifications that will support them either into employment or onto a
positive destination. On completion of these course the young people then deliver sport and physical activity sessions within
schools and communities – over 5,000 volunteer hours have been delivered. 
75 Ensure we remove any barriers to
participation for care experienced
young people to take part in sport and
physical activity. 
The role of the Active Schools and Community Partnership to work with key partners and stakeholders to remove barriers for
the young people and families within Care Experience across North Ayrshire to take part in Sport and Physical Activity using
a Whole Systems Approach to lead a healthier Lifestyle.  Across the last year we have delivered 47 different experiential
opportunities to 332 young people. The opportunities have ranged from residentials, skiing, team building days to outdoor
activities. The target groups for this work are care experienced, kids on the cusp, the inactive, New Scots (42), ASN (90 from
Lockhart only) or target groups. The participants are then supported into more frequent activity within their own school or
community of which 67% currently have taken this opportunity on. This number is ever growing as this work is a key
component of the role of the Active Schools and Communities Partnership Officers. 
76 Expand and develop the Health and
Wellbeing Service to accommodate
children and young people, with a
focus on partnership working within
the Mind and Be Active programme to
establish an early intervention
approach that provides supported
physical activity opportunities for
As identified in the KA Leisure Recovery and Renewal Plan (2021/22), developing Mind and Be Active (MBA), an adult
mental health programme to accommodate children, young people and their families was deemed a priority to ensure we
had the greatest reach to be able to increase activity levels, improve people’s health and wellbeing and contribute to
reducing health inequalities across North Ayrshire.
MBA is funded by HSCP and is designed to support adults, however, we have/and or are delivering a variety of projects with
partners to replicate MBA to support children and their families. Examples include:
• “Empower” Targeted project in secondary schools to support young people who are not engaging in school and who
either require support in groups or on a 121 basis. This includes a range of co-produced activities and health and
wellbeing topics. This is currently funded from the Young People Community Mental Health Fund
178

Page 179

16 
children and young people who are
experiencing poor mental health. 
• “Confident Kids Can” a 12 week pan-Ayrshire project delivered in partnership with CAMHS to support neurodivergent
children and their families who are experiencing emotional behavioural and mental health difficulties. The children
participated in the planning and co-design of the programme and activities delivered and it provided a valuable support
network for parents to share experiences and make new social contacts. 
In addition we are also receiving referrals from a number of different partners including Children and Families, Young
Person’s Support workers, North Ayrshire Community Link Worker Team and the Medical Paediatric Psychology Service
who are seeking appropriate physical activity-based interventions to support vulnerable young people experiencing poor
mental health. Whilst we are still developing a dedicated referral pathway and exploring funding opportunities, we are
accommodating the referrals and this is providing valuable insight, learning and data to enable us to test and inform the
creation of a dedicated programme to improve the health and wellbeing of children, young people and their families.
54 young people have benefited from tailored experiences with KA Leisure staff. The links with schools have been invaluable
and feedback from education staff has been positive. Young people are more confident and are engaging more in class. The
young people themselves say they feel more relaxed in school and are paying more attention. One young person is now
keen to become involved with volunteering at the club. Parents and carers too are noting the difference with one Foster
Carer describing the impact on her young person "I've seen him come out of his shell, and he now seems so much happier". 
77 We will work with Community
Planning Partners to establish a set of
outcome indicators to measure
progress on each of the priorities and
actions. 
A set of indicators have been agreed and these will be used as a baseline. These will be kept under review and may be
replaced with more appropriate indicators if available. 
179

Page 180

APPENDIX 2: Childrens Services Plan Performance Indicators 2023-24
1
The rights of children and young people are promoted and protected
Indicator 2020/21 2021/22 2022/23 2023/24
Children and Young People receiving Advocacy Support 157 178 N/A N/A
Number of young people taking part in influence and engagement
through CLD (Community Learning and Development) (e.g.
engagement, youth participation and citizenship work)
N/A
(COVID) 12,749 20,694 15,202
Proportion of child protection re-registrations within 18 months  8.4% 17.8% 10.8% N/A 
Acting early to improve what happens next
Indicator 2020/21 2021/22 2022/23 2023/24
Percentage of children meeting developmental milestones at their 27-30
month review 82.20% 78.70% 79.5% N/A
Babies who have always been exclusively breastfed (reported at 6/8
weeks) 19.6% 20.1% 17.8% N/A
Children referred to Reporter for offences (aged 8-15) (rate per 1000) 3.69 5.23 N/A N/A
Children referred to Reporter for care and protection (aged 0-15) (rate
per 1000) 14.9 16.26 N/A N/A
Immunisation uptake for 6-in-1 - children (aged 24 months) (3 year
rolling average) 97.18% 96.95% N/A N/A
Immunisation uptake for MMR - children (aged 24 months) (3 year
rolling average) 94.87% 94.20% N/A N/A
Number of Requests for Assistance received - referred to Specialist
Services - for Speech and Language 67 61 26 46
Number of Requests for Assistance received – referred to HV support
workers within UEY (Universal Early Years) team in the period for
Speech and Communication
179 193 139 157
Percentage of Primary 1 Children free from dental decay  N/A 71.16% 73.32% N/A
Percentage of Primary 7 Children free from dental decay  N/A N/A 77.34% N/A
Uptake of the HPV vaccine in S3 girls (3 year rolling average) 75.81% 75.20% 78.23% N/A
Deaths from suicide (aged 11-25) (rate per 100,000) (5 year rolling
average) 16.78 N/A N/A N/A
Alcohol-related hospital admissions (aged 11-25) (rate per 100,000) (3
year rolling average) 269.07 216.75 N/A N/A
Drug-related hospital admissions (aged 11-25) (rate per 100,000) (3
year rolling average) 204.29 164.48 N/A N/A
Smoking during pregnancy as reported at antenatal booking (3 year
rolling average) (Calendar year) 21.57 21.46 N/A N/A 
180

Page 181

APPENDIX 2: Childrens Services Plan Performance Indicators 2023-24
2
Making things fairer
Indicator 2020/21 2021/22 2022/23 2023/24
Proportion of Looked after Children with more than 1 placement in the
last year 22.7% 18.8% 17.4% N/A
Number of children looked after as at 31st July (age 0-17) 504 446 404 N/A
Children on the child protection register as at 31st July (rate per 1,000
children) 5.3 4.2 3.5 N/A
School attendance rate for whole population  91.4% N/A 89.0% N/A
School attendance rate for looked after children  89.5% N/A N/A N/A
Number of families receiving cash payments for Free School Meals
during holiday periods (school year) 3,047 3,120 2,706 N/A
Combined Numeracy achievement for P1, P4 & P7 (expected CFE level) 67.4% 75.5% 75.9% N/A
Combined Literacy achievement for P1, P4 & P7 (expected CFE level) 58.6% 67.3% 68.5% N/A
Percentage of pupils gaining 5+ awards at SCQF Level 5 (LGBF) 70% 67% 63% N/A
Percentage of pupils from 20% most deprived areas gaining 5+ awards
at SCQF Level 5  58% 53% 52% N/A
Annual participation measure for all 16-19 year olds (calendar year) 90.12% 90.84% 93.85% N/A
School leavers entering an initial positive destination  95.20% 96% 96.50% N/A
Percentage of Children living in poverty after housing costs 24.70% 29% N/A N/A 
Promoting good mental health and wellbeing
Indicator 2020/21 2021/22 2022/23 2023/24
Number of referrals to CAMHS (ISD Child and Adolescent Mental Health
Services in Scotland)  1,808 2,178 2,166 2,741
Percentage of referrals to CAMHS started treatment within 18 Weeks  97% 99% 95% 99%
Number of children and young people accessing Community Mental
Health and Wellbeing Supports and Services 829 3,093 6,038 N/A
Total number of children accessing counsellors (school year) 413 549 666 N/A
Percentage of children who have reported an improved outcome
following access to a counsellor 100% 100% 100% N/A 
Inspiring children and young people to be active
Indicator 2020/21 2021/22 2022/23 2023/24
Child healthy weight in Primary 1 (5% to 95% centile) 65.3% 78.70% N/A N/A
Number of young people (Distinct participants) engaged with Active
Schools during Extra Curricular (school year)
Not
Collected
due to
Covid 
6,570 9,285
Not
available
until End
of July
Number of Young people who are leaders in our key Active Schools
programmes (school year) 556 1,171
Number of Active Schools experiential opportunities offered to Care
experienced young people (school year) 9 31
Number of ASN (Additional Support Needs) pupils engaging with Active
Schools extra-curricular and through experiential opportunities (school
year)
55 140
KA Leisure memberships distributed either free or funded by partners N/A N/A 69 N/A
Active travel to school 44.46% 51.70% 47.49% N/A 
181

Page 182

182

Page 183

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet 
Title:    Brighter Pathways : Remodelling Care Options 
Purpose:  To ask Cabinet to note the programme of work and current
pressures on placement availability and alternative care for any
child and young person in the looked after system.   These
challenges are not unique to North Ayrshire and compounded by
a number of factors outlined in this report. 
Recommendation:  Cabinet are asked to :- 
1. Endorse the Brighter Pathways programme of work and
proposals to address the pressure areas with service
developments and alternative resources to prevent high cost
residential resources for children and young people.
2. Note the intention to build capacity and provide more local
resources and choice to young people who require to be
looked after with increased family based care and alternative
options for young people leaving care.
3. Note the review of current service provision to ensure it
meets current context, changing landscape of the care
system and the demographic young people and families. 
1. Executive Summary 
1.1 The HSCP have embarked on a programme of work to address the current challenges
associated with resources and accommodation for looked after and care experienced
young people. A Programme Manager has been appointed and will work alongside a
Planning Manager and Senior Management, to deliver and support the transformational
change over the next two years. A Programme Board has been established and chaired
by the Chief Social Work Officer, Scott Hunter with membership from key stakeholders
and Corporate Parents, to provide strategic leadership and governance to support the
workstreams and allocate resources where required.
1.2 There are consolidated evidence-based messages from local authorities that there is
significant challenges and pressures across the system which has been growing for
some time prior to the mandating of the National Transfer Scheme in 2021.  Indeed,
there is a clear message that whilst the volume of Unaccompanied Asylum Seeking
(UAS) children and young people arriving has increased the pressure on the system, it
has not in isolation caused today’s significant pressures in care. 
Agenda Item 11
183

Page 184

1.3 The work of the Brighter Pathways programme board will be closely aligned with The
Promise development plan and the work of the Corporate Parenting Steering Group
which is responsible for overseeing the six Corporate Parenting duties and each
corporate parent upholds the rights and safeguard the wellbeing of Care Experienced
people.  There is a collective responsibility, ownership and commitment across services
and agencies to develop solutions to our challenges, and shared goal of achieving the
best possible outcomes for care experienced young people in North Ayrshire. 
It is proposed the transformational change and service developments will be delivered
through establishing focussed workstreams on the following areas: 
1. Housing and Throughcare
2. Fostering and Kinship
3. Education including Residential School Placements
4. Internal Children’s Houses – Model of Care
5. Early Intervention and Crisis/Intensive Support Pathways
6. Strategic Needs Assessment/Data/Workforce
7. Best Practice Models and Research 
2. Background 
2.1 Children’s Placements 
Overall, the number of Looked After Children has steadily reduced over the last few
years but the numbers in residential care have not followed the same trend, and the
number of requests for Continuing Care has increased significantly. Positively the
number of Kinship placements has increased over the same period. The graphs below
illustrate the movement/trends since 2018. 
184

Page 185

2.2 Residential Care 
At present within North Ayrshire Health and Social Care Partnership there is a
significant overspend associated with Children’s Residential Placements, over £5m
across the HSCP and Education. The overspend predominately relates to costly
External Residential Placements.  
We started 2024 with 32 external placements. These placements are costly and do not
always deliver the best outcomes for children, young people, and their families. Overall,
the number of Looked After Children has reduced over the last few years but the
numbers in residential care have not followed the same trend, and the number of
requests for Continuing Care has increased significantly, at present we have 53
Children and Young People in Continuing Care, it is predicted that the number of
Children receiving Continuing Care will continue to rise, resulting in older children
staying longer within Residential Care settings.   The HSCP acknowledge that some
children will always require more specialist resources due to their needs and complexity
and in some situations an external residential placement will be unavoidable.
There are a number of factors leading to this challenging position: 
• We have 32 places available in our internal children’s houses, due to demand these
have been over occupancy for some time, at points in the last year we have had 39
young people within the houses, leading to increased use of external placements
where residential care is required. 
• We have limited availability of alternative care provision and community options,
supported carers or supported accommodation options within North Ayrshire. 
• Acute crisis in recruitment and retention of foster carers within North Ayrshire which
has created capacity issues and limited family-based options for children and
reliance on external fostering providers or residential care. 
• The requirement to support Unaccompanied Asylum-Seeking Children (UASC)
under the National Transfer Scheme and to support trafficked young people who
have been identified in North Ayrshire. We currently have 31 young people living
within North Ayrshire, across both our residential houses and semi-independent
living who have come to us through these routes.
• A number of young people in residential care have requested Continuing Care,
whereby a young person can remain in their placement until age 21. 
• Where appropriate young people are placed to meet their educational needs, the
cost of Residential School Placements in most cases is shared 50/50 with Education
services.
The landscape and demographic of young people in residential care has shifted with an
increase in young people aged sixteen and above with a high number requesting
continuing care which supports them to remain in residential houses until they are aged
21. This changing landscape is a result of Continuing Care legislation and Staying Put
Guidance for Local Authorities and other Corporate Parents which promotes supporting
looked after children and young people to remain in care, as part of a staged transition
towards adulthood and greater independence. 
185

Page 186

2.3 Unaccompanied Asylum-Seeking Children/Trafficked Young People
Unaccompanied asylum-seeking children (UASC) and separated migrant children
under the age of 18 who have been trafficked to Scotland, are looked after and
accommodated by local authorities as children in need under Section 25 of the Children
(Scotland) Act 1995.
Over the last few years there has been an increase in young people coming to North
Ayrshire through the mandation of National Transfer Scheme in 2021. There are
currently 12 Unaccompanied Asylum-Seeking Children and Trafficked Young People in
residential care and 19 who are supported in the community in shared tenancies, 1 in
supported care. There has also been an increase in Trafficked Young People, 7 have
been supported and provided accommodation in residential care. Trafficked young
people are spontaneous arrivals and the local authority is required to identify
appropriate accommodation for these young people at short notice as the notification is
usually through out of hours social work and there is lack of opportunity to plan and
resource accommodation options. 
North Ayrshire receives funding from the Home Office for young people placed via the
National Transfer Scheme, this is set at £1,001 per week for young people under 18
and £270 per week for young people over 18. The HSCP receive a lesser payment of
£798 per week for a child who presents spontaneously (trafficked child) in the area.
Funding from the Home Office falls far short for the costs associated with residential
care for young people under 18 and is significantly lower for young people who remain
in residential care under continuing care post 18.
North Ayrshire is proud of the support that we offer displaced and disadvantaged young
people and we are committed to supporting these young people into adulthood and
support their asylum process, educational needs and their transition from residential
care to semi-independent or independent living. 
North Ayrshire is not alone in facing these challenges, the Scottish Government recently
undertook a scoping exercise working with areas across Scotland to better understand
the pressures on the care system and the impact of responding to the needs of UASC.
The report highlighted the significant lack of placement availability, which is
compounded by the number of children arriving, the impact of continuing care, a decline
in the number of foster carers, reduction in internal residential capacity, restrictions on
residential capacity, growing pressures on stretched social work teams and a lack of
suitable move on accommodation due to housing pressures. This often leads to
extremely high costs due to increased use of costly external placements.
2.4 Family Based Care 
Kinship Care
There has been significant progress and increasing numbers of children in kinship care
in North Ayrshire and this is being explored at an early stage with families which is
supported further by the Signs of Safety approach, kinship care is the preferred and first
option for children who require alternative care which aligns to the HSCP Kinship Care
Strategy and the ethos of The Promise. Kinship options are being explored and are
continually considered throughout a child/young person’s care journey and before a
permanence plan is agreed.
186

Page 187

There are currently 340 children in kinship care placements supported by the HSCP. 
Foster Care
As at 31 March 2024 the fostering service had 72 fostering households who care for
131 children, the service has approved 5 family and friends’ carers and 11 short break
carers who offer support to the main foster carers.  
There are also 9 children placed with external fostering providers. 
During the period from 2019 until 2023, there were 16 interim carers approved by the
fostering services, in the same timescale 31 carers were de-registered.
The acute crisis in foster care recruitment and retention has been widely documented
and the significant shortfall of foster carers is having an impact on Independent
Fostering Providers and Local Authorities across Scotland and the UK. Within North
Ayrshire there has been more de-registrations than approvals of new carers which has
created pressures resulting in fostering being a diminishing resource for children of all
ages. As result of continuing care young people are choosing to stay with their foster
carer until aged 21 which prevents them from caring for any other children. 
The biggest challenge facing the fostering sector is the retention and recruitment of
high-quality foster carers who can meet the needs of children in care. 
In addition, the fostering service has not accommodated any young people over the age
of 12 since 2020.   There is lack of capacity or pool of carers who have been
assessed/approved to provide care to teenagers and the current enhanced carers are
at capacity and placement limit.   
Due to capacity issues and lack of recruitment of carers willing to care for children over
the age of 12, fostering services have become a resource mainly for children under 12
and any enquiries/alerts for older children for a fostering placement from the community
can’t be resourced, with a reliance on them being accommodated in residential care.
The service is reporting challenges with resourcing external fostering provision due to
them also facing significant challenges with recruitment.  
The Scottish Government are acutely aware of the foster carer crisis, there is much
work in progress by the Scottish Government who formed a group around a year ago
on the back of the staying together and connected implementation group and all the
gaps identified in achieving the sibling’s legislation (The Children (Scotland) Act 2020
and the Looked After Children (Scotland) Amendment Regulations 2021).  The Scottish
Government are currently consulting with practitioners, through two Association
Fostering Kinship and Adoption Forums and carers currently and there are a number of
key areas that are likely to be taken forward with a focus on both recruitment and
retention.
There were only 196 applications to Foster across Scotland in 2023, a 4.8% decrease
from the previous year and the lowest in 6 years, research by The Fostering Network
has indicated 12 per cent of foster carers retire or leave every year and that another
500 foster families are required across Scotland.  
187

Page 188

Factors impacting on Recruitment/Retention:
• Increase in home/agile working and spare room used as an office. 
• Inflation/Cost of living crisis/allowances – NAHSCP paid higher than National
Minimum allowances Scottish Government introduced – apart from 16plus – Flat
rate £400 per week.
• New minimum allowance unlikely to have a significant impact in
recruitment/retention. 
• Financial risks associated with fostering (secure employment & pension), no
income if no children in your care. 
• Fostering not financially viable if only have one child at £400 per week, annual
income of £20,800 (tax free). 
• Fewer young people leaving home lack of spare bedrooms.
• Carers retiring, age and stage of life, carer burnout. 
In light of these challenges, in retaining and recruiting foster carers and the impact on
children when family-based care is not available, this is an area of significant concern
to the HSCP and the current fostering schemes will be reviewed to consider allowances,
contractual short breaks, training and support within the workstream and
recommendations made to the Programme Board to support the retention and
recruitment of foster carers within North Ayrshire.
2.5 Transformation Programme – Brighter Pathways
There are concerns that lack of local placement availability necessitates children being
placed out with their local area and is an increasing concern that the level of
displacement will grow further due to lack of local options and capacity. 
The current situation with regards to care options and alternative resources for children
and young people is very challenging and there is a need for transformational change
and to consider different models to support and care for young people and consider re-
modelling of current resources with a view to having alternative options for young people
moving on from care and to create capacity in the residential houses to prevent children
being placed in high cost external resources.
The current position within North Ayrshire is that there is a lack of alternative options to
support young people’s transition from residential care to supported care and semi-
independent living and them requesting continuing care is an option of choice due to
lack of alternative resources/options.   
The Brighter Pathways Programme Board has been established.  There is a shared
awareness with regards to the current pressures and a commitment from all corporate
parents and key stakeholders to contribute to the work of the project to deliver services
differently and for children and young people to have access to the appropriate
resources and supports into adulthood.
The work of the Brighter Pathways programme board will be closely aligned with The
Promise development plan and the work of the Corporate Parenting Steering Group
which is responsible for overseeing the six Corporate Parenting duties and each
corporate parent upholds the rights and safeguard the wellbeing of Care Experienced
people. 
188

Page 189

The transformational change and service developments will be delivered through
establishing focussed workstreams to support the Brighter Pathways Programme Board
with a focus on the following areas: 
1. Housing and Throughcare:
Review the current housing protocol for care leavers and pursue alternative
accommodation options to support and prepare young people to transition from
residential care to live independently in the community. The workstream will consider
the use of supported care and look at models of supported accommodation.
2. Fostering and Kinship
Address the challenges around recruitment and retention of foster carers and a
review of current fostering schemes and how we can support and sustain children in
family-based care with foster carers and kinship carers and prevent placement
disruption and children being placed in internal and external residential care.
3. Education including Residential School Placements
Review the current educational provision for looked after children and to ensure
children who are looked after are provided with the appropriate support to sustain
them in mainstream education and to prevent additional pressure on their
carers/placement if require to be out of school.
4. Internal Children’s Houses – Model of Care
Review the current model of care within the four children houses and the changing
demographic and increase in young people over sixteen. Consideration will be given
to is the current model providing the necessary support to young people to increase
capacity for independent living.
5. Early Intervention and Crisis/Intensive Support Pathways
Map out the current supports from early intervention to crisis and intensive support
to identify if there are any identified gaps in service provision to support children and
families and to ensure that the services and interventions are targeted appropriately
to provide early help and more intensive support to prevent children requiring
alternative care.
6. Strategic Needs Assessment/Data/Workforce
Explore the current and future demographic and date to inform future resources and
staffing levels. The work stream will project and model likely future need of care
setting for children and young people.
7. Best Practice Models and Research
This workstream will scope out current models and approaches currently utilised and
undertake research and benchmarking with other areas and consider new ways of
working to support children and families. 
3. Proposals 
3.1 The role of the Programme Board is to provide strategic leadership and oversight to the
programme of work, in addition, the Programme Board will:
• Inform, engage, and take collective action on key issues identified.
• Own and be accountable for the delivery of agreed actions. 
• Resolve strategic issues and remove barriers. 
• Ensure all members have a shared situational awareness. 
189

Page 190

• Support the work of the project groups and allocate resource where required, 
and as appropriate. 
3.2 The anticipated outcomes of this work are :- 
• To improve local resources and range of choices for young people leaving care. 
• To improve long term outcomes for young people/ care leavers.  
• Review current service provision to ensure it meets current context, changing
landscape and demographic of young people and families. 
• Support innovation in supporting children to remain in family-based care, with
parents, foster carers or kinship carers.  
• Review and analyse the effectiveness of the preventative, early intervention and
community-based supports for children, young people and families.
• Review the model of support and alternatives for UASC/Trafficked young people. 
• All care experienced children and young people in North Ayrshire grow up feeling
loved, safe and respected so they can realise their potential. 
3.3 The Project Board will be tracking the progress of work plans or developments within
the workstreams.  
There will be analysis of data and a needs analysis to project future demands for
supports and services and how services need to be delivered.  This will be an ongoing
process that will review all young people within internal and external residential
resources and their pathway to a supported community-based alternative or
independent living. 
4. Implications/Socio-economic Duty 
Financial 
4.1 As part of the programme of work there will be recommendations for short term
investment and future re-alignment of financial support in specific areas with a view to
longer term financial sustainability for the IJB and local authority.   As noted whilst
financial outcomes are not the main driver for the change programme which is focussed
on quality outcomes for young people and families, there is an underlying overspend of
over £5m in external residential placements which requires to be addressed,
recognising the work and time required to make the changes required the IJB provided
for an additional £4m of resource as a budget pressure in 2024-25 to support this cost
pressure with an expectation of this reducing over time. 
Human Resources 
4.2 Any possible impact on staff due to re-modelling or service redesign will be explored
fully in the workstreams and project board, affected staff and Human Resources will be
consulted. 
Legal 
190

Page 191

4.3 There is legislation and policy that govern looked after and care experienced children
and young people and the programme of work will adhere to the legislative frameworks
and relevant policies and regulations. 
Legal services will be consulted on any legal matters that arise throughout the
programme of work. 
Equality/Socio-economic 
4.4 The aspirations of the Programme Board are in line with the vision of The Promise to
address the inequality of outcomes experienced by our children and young people who
have been or are in the care system.  If the ambitions of The Promise are realised, not
only will there be improved outcomes but also a reduction, and ideally, an elimination
of the inequity that exists between care experienced children and young people and
children and young people with no experience of care. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 The work of the Programme Board fully aligns and supports the work of the Councils
strategic plans: 
• The Promise – Plan 21-24.
• The United Nations Convention on the Rights of the Child (UNCRC).
• Kinship Care Strategy.
• Getting it Right for Every Child (GIRFEC).
• North Ayrshire Councils Corporate Parenting Plan 2023-2026.
• Children’s Services Plan 2023 -26. 
The proposal and recommendations support the spirit of The Children and Young
People (Scotland) Act 2014, which outlines the need for appropriate accommodation
for young people over 16 years of age, to support them to prepare for independent
living. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Throughout the programme of work there will be ongoing consultation and collaboration
with service areas, national bodies, third sector colleagues and consultation and co-
production with service providers, young people, families, and carers. 
191

Page 192

Caroline Cameron
Director, HSCP 
For further information please contact Elizabeth Stewart, Head of Children, Families &
Justice, on estewart@north-ayrshire.gov.uk. 
Background Papers
0
192

Page 193

NORTH AYRSHIRE COUNCIL 
4th June 2024 
Cabinet 
Title: Participation Strategy and Locality Planning Update 
Purpose: To seek Cabinet approval of the proposed North
Ayrshire Participation Strategy and provide an update on proposed
next steps in relation to North Ayrshire’s locality planning approach
to support the implementation of the strategy. 
Recommendation: That Cabinet:
a) Approves the proposed North Ayrshire Participation Strategy
at Appendix 1 for publication; and
b) Approves the proposed next steps at paragraphs 2.15-17 to
develop the locality planning approach further and agrees to
receive a further report to Cabinet on the outcome of this work. 
1. Executive Summary 
1.1 North Ayrshire Council has an excellent reputation for the manner in which it works
with its communities and has long recognised the importance of participative
democracy in co-designing and delivering the best possible services alongside its
partners and communities. For democracy to thrive, people must be encouraged and
supported to take part in decision making at all levels. The proposed Participation
Strategy at Appendix 1 is an overarching commitment to our ambition for the
continuing development of this collaborative and participative working and a resource
for staff and community members to use when designing, delivering and participating
in their communities. 
1.2 This strategy builds on the Community Empowerment (Scotland) Act 2015, Scottish
Government and COSLA joint Review of Local Governance (encompassing the
Democracy Matters and Democracy Matters 2 conversations) as well as the learning
from the joint working during the coronavirus pandemic conversations, which informed
the Scottish Government’s Social Renewal Advisory Board. It is written for our
communities and offers them pathways and support to encourage them to participate
in democratic and community life in North Ayrshire and beyond. 
1.3 The ambition of the proposed Strategy is to build upon the excellent work and
reputation of North Ayrshire and to continue to find new and innovative ways in which
to support participation and ensure that residents are placed at the centre of decision
making and democracy.
Agenda Item 12
193

Page 194

that further the transparency of decision making. 197 
1.4 The proposed Strategy comprises three sections – firstly, an explanation of what
participation is, who can be involved and the standards which we hold ourselves to in
our work; effectively a way of explaining how it should feel to be involved in
participative activity within North Ayrshire and what that might look like. The second
section is a community pathway, a live document containing information on the
various groups, routes and activities within communities that individuals can be
involved in, depending on their areas of interest and needs. The final section is a staff
resource which supports the work of the Community Planning Partnership’s
Community Engagement Network in providing a centre of expertise and excellence
for networking, idea and resource sharing and a joint calendar of engagement activity. 
1.5 Locality planning is one of the key levers used in North Ayrshire to encourage
communities to have their say on the issues which are important to them and work
together to co-produce solutions. Using the proposed new North Ayrshire
Participation Strategy as a catalyst, a programme of self-assessment work in relation
to locality planning has been developed and is set out at paragraphs 2.15-17. Some
of the early actions which will support the implementation of the strategy are geared
around raising the profile and further development of the locality planning approach. 
1.6 This report sets out the proposed new North Ayrshire Participation Strategy at
Appendix 1, along with proposals for self-assessment work in relation to our locality
approach. The results of the latter will be the subject of a future report and
recommendations to Cabinet. 
2. Background 
2.1 Participation encourages collaboration, cooperation and collective action which lead to
improved outcomes for people, and open, transparent and participatory government is
fundamental to democracy. Over the past decade, North Ayrshire Council has been
building its approach to community empowerment, strengthening communities and
supporting community organisations. The Christie Commission in 2011 recognised the
importance of this as a way of working and as a driver for public sector reform. This
was further enhanced by the introduction of the Community Empowerment (Scotland)
Act in 2015. The proposed new Human Rights Bill for Scotland is likely to enshrine
participation as a right for citizens. 
2.2 North Ayrshire has always valued the participation of its communities through sharing
their lived experience and working together to co-design local solutions to improve
outcomes for residents. There are a variety of different ways that people in North
Ayrshire can currently participate in local decision making and democracy. The
importance of this work is embedded within the North Ayrshire Partnership Plan and
recognised through the inclusion of “Communities and Local Democracy” as one of
the four key priorities of the Council Plan, with the aim being that we will have active,
inclusive and resilient communities. 
2.3 The 2020 Best Value Audit Report recognised that the Council proactively engages
with communities, including hard-to-reach groups and its most vulnerable
communities. In the 2021-22 Best Value statement, Audit Scotland identified that
“The Council continues to be open and transparent and demonstrates a culture of
continuous improvement”. The proposed new Participation Strategy seeks to further
that continuous improvement by setting out our overarching approach to
participation, offering an accessible pathway for communities to participate and a
commitment to developing new, innovative and inclusive methods for participation
194

Page 195

198 
2.4 There are a range of existing plans and strategies supporting the participation of
specific sections of the community, such the Youth Participation and Citizenship
Strategy 2021-2025, the Housing Services Customer Participation Strategy, the
HSCP Participation & Engagement Strategy, and the work with older people included
in the priorities set out in North Ayrshire Council’s Strategic Community Learning &
Development Plan 2021-2024. The creation of the new Communities and Housing
Directorate within the Council offers the opportunity for these areas of work to be
more closely aligned to support each other and work together. 
2.5 The proposed North Ayrshire Strategy does not attempt to replicate any of the
existing participation work, but rather provide an overarching ambition and articulate
the ongoing commitment of the Council in supporting both existing and new and
innovative participative approaches and ensuring that as many people as possible in
communities are able to take part in decision making in ways which are proportionate
and appropriate for their needs and capacities. It offers an opportunity to bring
together the various strategies across the Council which support participation and
coordinate further both their implementation and the use of the feedback which is
received. It also makes it easier for those within communities to find the various
routes through which they can participate. 
2.6 The development of mini-enquiries to conduct deep dives into key topics shows a
move towards further deliberative dialogue and co-design of solutions between
communities and partners. The entire strategy supports the continuation of ongoing
dialogue between communities, partners and the council and recognises that each
community, whether geographical or of interest, is unique. This means that
consideration needs to be given to the specific needs of each community and which
methods of participation are most suitable for them. The commitment of the Strategy
is to continue to work with communities to find new and innovative ways in which
participation can be supported and increased, and which meet these unique needs. 
2.7 The Strategy is written for community members. It is designed to be as clear as
possible, and to provide them with the information they need to support their
participation. The Strategy comprises three sections – firstly, an explanation of what
participation is, who can be involved and the standards which we hold ourselves to in
our work; effectively a way of explaining how it should feel to be involved in
participative activity within North Ayrshire and what that might look like. The second
section is a community pathway, a live document containing information on the
various groups, routes and activities within communities that individuals can be
involved in, depending on their areas of interest and needs. The final section is a staff
resource which supports the work of the Community Planning Partnership’s
Community Engagement Network in providing a centre of expertise and excellence
for networking, idea and resource sharing and a joint calendar of engagement
activity. 
2.8 Our Community Planning Partners were directly involved in the development of the
strategy, with representatives joining a working group to help write the content and
influencing the style based upon their own engagement with communities to ensure it
was as accessible and understandable as possible. With this in mind, the Strategy
acknowledges the work and contribution of partners and will be presented to the
Community Planning Partnership (CPP) Board subject to Cabinet approval.
195

Page 196

199 
2.9 During late 2023 and early 2024, a Members and Officers Working Group considered
representation in participation across North Ayrshire. The discussions and
conclusions of this group supported the development of the strategy, and the
consideration of the actions which needed to be taken to support its roll out. In
addition, the proposed North Ayrshire Participation Strategy was considered at the
Council’s Policy Advisory Panel in April 2024, where discussion with elected
members again reinforced the need to ensure that the information contained in it is
available as widely as possible to support participation by all sections of the
community. We have considered this in both the online presentation and publicity of
the strategy and in the ways we will make it available for those less able or willing to
use digital resources. 
2.10 The delivery of the first year of the strategy will focus on the following actions: 
• Promote and raise awareness of the strategy and the ways in which people can be
involved
• Gather examples of effective engagement, participation and change to share
• Enhance our budget consultation process
• Work to further develop and promote our locality planning approach 
2.11 Another way in which the new Strategy will be implemented is through the budget
consultation process. The Council has previously concentrated its public facing
budget engagement exercise into the latter part of the year, seeking views from
groups and organisations mandated to represent their communities,
supplemented with online surveys which gather information from the wider public.
This year, the proposal is that the consultation becomes a conversation over a
longer time period, working with the various networks for participation identified
within the strategy, to discuss priorities with communities. This allows direct
engagement with some of the community groups and members who are less
likely to participate in a specific budget engagement session but who may be
highly impacted by the decisions made around the budget. The information
received can then be used to shape the content of the final engagement sessions
late in the year. This represents a step towards greater dialogue and co-design of
core services with our communities. 
2.12 The Strategy is presented as a hard copy document attached as Appendix 1 for
consideration. In reality, it will be a live document hosted within the new CPP website,
which can be updated regularly. While our commitment to participative working and
the standards which we work to will remain, the methods used and the pathway which
the community can access are iterative and evolving in response to the changing
needs of our communities and the ongoing engagement we have with them about the
best ways for them to participate which helped inform this initial version of the
strategy. 
2.13 We will ensure the Strategy is visible through the Council’s online resources,
including the website and social media. We will also seek to promote the Strategy
widely across partners. It is recognised that not everyone is able or willing to use
digital resources and, in line with the inclusive principles of the strategy, information
will be available in other formats as required, and awareness will be raised amongst
Council staff and partners regarding the Strategy and the importance of promoting
participation to their service users.
196

Page 197

4.3 None. 200 
Locality Planning Approach 
2.14 One of the key routes for participation in North Ayrshire is through locality planning,
including the work of the locality partnerships which bring our Community Planning
Partners, elected members and community representatives together to jointly address
local priorities. Locality planning is a process which we seek to constantly improve,
with the last development being a review of the partnership Terms of Reference and
membership criteria in 2022. 
2.15 Using the proposed new North Ayrshire Participation Strategy as a catalyst, a
programme of self-assessment work in relation to locality planning has been
developed. This reflects our ambition to continue to grow and improve the local
governance framework, using locality planning as a key lever to do so, and
reflecting the ambitions of communities across Scotland which have been identified
so far through the progress around the Local Governance Review and Democracy
Matters 2 conversation. 
2.16 The self-assessment exercise will take place over summer/autumn 2024 and
will include the following areas of work:
• Surveys with key locality representatives to gain a deeper understanding and
identify what is currently working well, what the challenges to locality working are
and what the opportunities are to develop the collective contribution.
• A wider review of the best of practice across national networks to inform our
locality planning approach, tailored to local circumstances as required. 
2.17 Following this exercise, officers will bring a further report to Cabinet later in the year
outlining recommendations for the next phase of developing our locality planning
approach. The work is also expected to contribute towards the updated locality
partnership plans for 2024/25. 
3. Proposals 
It is proposed that Cabinet:
a) Approves the proposed North Ayrshire Participation Strategy at Appendix 1 for
publication; and
b) Approves the proposed next steps at paragraphs 2.15-17 to develop the locality
planning approach further and agrees to receive a further report to Cabinet on the
outcome of this work.
4. Implications/Socio-economic Duty
Financial
4.1 The delivery of the strategy will be carried out using existing resources. 
Human Resources 
4.2 There are no human resources implications arising from the report. 
Legal
197

Page 198

201 
Equality/Socio-economic 
4.4 The purpose of the Participation Strategy is to reduce inequalities, widen democratic
participation and advance community empowerment by encouraging people to
become involved in their community and simplifying the way they can do so. North
Ayrshire strives to engage well with all parts of the community and partners to
address poverty and inequalities, in order to learn from the voices of lived experience. 
Environmental and Sustainability 
4.5 Participation can support sustainability through, for example, community involvement
and volunteering in environmental projects, as well as developing the capacity of
communities to source and manage funding for projects which contribute towards their
sustainability. 
Key Priorities
4.5 Community participation supports the North Ayrshire Council Plan strategic aims: 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience for
local people.
• We will have active, inclusive and resilient communities.
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.6 The Strategy encourages increased democratic participation and greater awareness
of opportunities, for example, for community ownership of land and assets and
plural ownership of the local economy through inclusive ownership models. 
5. Consultation 
5.1. The Strategy has been developed in response to the ongoing dialogue with
communities and groups and in partnership with our key stakeholders and CPP
partners.
David Hammond
Executive Director Communities and Housing 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on (01294) 324415. 
Background Papers 
198

Page 199

202 
Appendix 1 - Draft Participation Strategy
199

Page 200

203 
Who is this strategy for?
This strategy is for everyone who lives and works in North Ayrshire.
It shows the ways you can participate in decisions that affect you and the people that matter
to you.
It also shows what you can expect when you get involved and how you will be treated,
through the National Standards for Community Engagement. 
Which organisations are involved in this strategy? 
What does this strategy cover?
• This strategy shows how we want to support communities to be involved in engagement
and participation in North Ayrshire.
• On the North Ayrshire Community Planning Engagement Hub you can find
resources that can help communities and partners get involved in or design different
types of participation, information on what has happened, and examples of changes that
have happened through local people getting involved in decision making in North
Ayrshire.
• The strategy is intended to encourage more involvement in local decision making and
provide a route for young people from the Youth Participation and Citizenship
Strategy 2021-2025.
• We want to make sure all sections of our communities can participate, including those
who may find it more difficult to do so; help you to feel that getting involved can make a
difference; increase democratic involvement in North Ayrshire; and help you to feel a
greater sense of ownership and control over what is happening locally. 
What is our commitment to you?
200

Page 201

204 
In the first year of this strategy, we will:
1. Enhance the North Ayrshire budget consultation process;
2. Further develop and promote locality planning;
3. Gather more examples of effective engagement participation and change; and
4. Promote and raise aware ness of the strategy and how people can get involved. 
The National Standards for Community Engagement
In North Ayrshire we work to the
National Standards for Community
Engagement.
They are a set of principles designed
to improve and guide the process of
community engagement. They are
intended to support and inform the
process of community engagement
and improve outcomes.
There are seven standards:
1. Inclusion
2. Support
3. Planning
4. Working together
5. Methods
6. Communication
7. Impact.
These standards are not designed to replace existing community engagement or
participation frameworks but are intended to act as a benchmark and reference point for best
practice. 
“Our commitment in this strategy is
that we will involve local people in
decisions that affect their lives, and
that we will do this in a way which is
accountable, open and transparent.”
You can find out more about the National Standards here: National Standards for
Community Engagement | SCDC - We believe communities matter
201

Page 202

205 
Why should you get involved in local decision making?
In North Ayrshire we want decisions to be made as close to the communities they affect as
possible, and we are committed to local democracy. It strengthens local and community
decision-making in ways that improve outcomes, grow the economy for everyone’s benefit,
support communities to focus on their priorities, and help new ideas to flourish.
We understand that what is right for one place will not necessarily be right for another and
decision-making arrangements will vary. We also recognise the role our communities are
playing in tackling inequalities and driving inclusive growth through community wealth
building. This includes taking a leading role in designing and delivering services, managing
and owning community facilities and planning for the future with local people and the
Community Planning Partners.
All of this helps our communities to have a sense of ownership, pride and control and can be
inspirational and rewarding to be part of. 
How and where can you find ways to participate? 
We have a stack of engagement case studies on our Engagement Hub. You can also
access them here.
202

Page 203

206 
There is more detailed information on the different ways you can be involved in using
the Community Pathway Tool on the Community Planning website. (LINK once
content is live)
Our Online Engagement Calendar will show you what is happening and when, as well as
how to get involved.
How will we know what we are doing is working?
✓ We will keep talking to you about your experiences when you are involved in
participation in North Ayrshire. This helps us to understand how it feels for you to be part
of decision making and democratic processes, what we are doing well and what we can
change to improve things.
✓ We will report on progress through the CPP Annual Report.
✓ Through the feedback to you, we can show the difference that your participation has
made and the decisions that have been affected. Feedback methods will be different for
each participation process and in some cases will include formal reporting, such as the
annual reports we produce showing the progress our locality partnerships are making
against each of their priorities. In other cases, feedback will be more informal, but we
commit to making sure we tell you the difference being made through your involvement.
✓ You can find case studies around engagement taking place across North Ayrshire on
the Community Planning website. 
Have a question?
If you have a question about any the strategy or any of resources on the website, you can
contact the partners involved directly to ask them. You can also contact the Community
Planning Team at North Ayrshire Council, who will be happy to put you in touch with the right
person who can answer your query.
➢ communityplanning@north-ayrshire.gov.uk
203

Page 204

207 
Appendix 1: Strategy Resources Hosted on the new CPP website Engagement Hub
The Participation Strategy resources are hyperlinked below: 
1. Our Participation Approach: Strategy Text
• Access at https://northayrshire.community/the-participation-hub/ 
2. Engagement Resources for staff and Partners
• Live online Toolkit in Sway including links to partner resources, strategies and case
studies
• Community Engagement Network
• North Ayrshire Community Directory
• Online Engagement Calendar 
3. Engagement Resources for the Community: For Community Members and
Groups
• Online signposting to engagement resources via the Engagement Toolkit
• Community Roadmap Tool: Ways to get involved in North Ayrshire- See draft content
at Appendix 2.
• North Ayrshire Community Directory
204

Page 205

207 
Appendix 2: Community Engagement Roadmap: Ways to Get Involved in North Ayrshire- Draft Content 
Theme Participation
Method
Purpose How to get involved
Wider Community Community
Councils
In terms of Section 51(2) of the Local Government
(Scotland) Act 1973, the purpose of a Community
Council, in addition to any other purpose which it may
pursue, shall be “to ascertain, co-ordinate and express
to the local authorities for its area, and to public
authorities, the views of the community which it
represents, in relation to matters for which those
authorities are responsible, and to take such action in
the interests of that community as appears to it to be
expedient and practicable”. You can find general
information at www.communitycouncils.scot
You can contact your local community
council for further information on meeting
dates and arrangements. 
If the community council in your area is not
currently active and you are interested in
helping to re-establish it, please contact the
Committee Services team
(committeeservices@north-ayrshire.gov.uk
or 01294 324131) to find out how.
Locality
Partnerships
Our Locality Partnerships are how we fulfil the duty in
the Community Empowerment Act 2015 to have locality
arrangements. There are six Locality Partnerships in
North Ayrshire, which cover the whole local authority. 
Locality Planning in Scotland is about reducing
inequalities and enabling communities to participate in
decision making at a neighbourhood level. Our Locality
Partnerships have developed locality priorities that are
set out and progressed through annual Locality Action
Plans.
To find out more or get involved you can use
the CPP website at
https://northayrshire.community/your-
community/ or email
communityplannng@north-ayrshire.gov.uk
Locality
Subgroups
Some of our Locality Partnerships have subgroups that
meet between formal Locality Meetings to progress
locality priorities.
To find out more about the Locality
Subgroup for your area please email
communityplanning@north-ayrshire.gov.uk
Locality Chit
Chats
Chit Chats give the
community an opportunity to come forward and express
how they feel about the specific topics and giving input
on how they feel. Engagement such as this takes the
community on a journey by showing them the plans and
To find out about previous or planned Chit
Chats across the localities, please contact
communityplanning@north-ayrshire.gov.uk
in the first instance.
205

Page 206

208 
developments put in place from the feedback received. 
Community
Associations
and
Committees
A Community Association or Committee is an
organization of people and groups working for the
common good of a neighbourhood, usually operating
under a written constitution.
Find out how to contact your local
Community Association at on the Council’s
website at https://www.north-
ayrshire.gov.uk/your-
community/facilities/community-centres-and-
halls.aspx
Participatory
Budgeting
Participatory Budgeting (PB) is an inclusive way for local
communities to decide how they want to spend public
funds. It began in Brazil in 1989 and has since been
used in many countries around the world including the
USA, Sweden, the Dominican Republic, Italy and many
more.
Find out more about PB in North Ayrshire on
the CPP Website at
https://northayrshire.community/community-
empowerment/participatory-budgeting-in-
north-ayrshire/
North Ayrshire
Peoples
Panel
The People’s Panel a survey of 1,500 residents who
have agreed to answer questions and provide their
views on the areas in which they live.
For more information please contact
communityplanning@north-ayrshire.gov.uk
in the first instance. 
The People’s Panel Survey was originally carried out
annually but is now every two years. The Partnership
uses this information to decide what action to take on the
issues that local residents tell us need to be improved. 
Volunteering There are hundreds of community groups and
organisations across North Ayrshire all being driven by
local people who volunteer to help.
To find out more and for links to our Third
Sector Interface, please go to
https://northayrshire.community/community-
empowerment/volunteering/ 
These range from community associations, advice and
advocacy agencies, targeted support groups, therapy
and wellness organisations, agencies providing public
services such as caring for the elderly, to children’s
groups, clubs for enthusiasts and hobbyists such as
gardening, cooking, reading and chess, knitting bees,
historical societies and walking clubs. 
What could you do? What are you good at? What do you
care about? How can you help your community? 
206

Page 207

209 
Whatever your choice there is a community group or
organisation for you. 
Participation
Requests
Part 3 of the Community Empowerment Act 2015
enables communities to request to participate in
decisions and processes which are aimed at improving
outcomes.
You can access the North Ayrshire
Participation Request form and guidance at
https://northayrshire.community/community-
empowerment/community-empowerment-
act-duties/ 
Read The Participation Request (Procedure) (Scotland)
Regulations 2017 at
https://www.legislation.gov.uk/ssi/2017/39/contents/made 
CPP Website
Engagement
Calendar
The Community Planning Partnership website has a list
of engagements and consultations taking place in North
Ayrshire.
Access the list here
https://northayrshire.community/consultation/
Adult Carers
(North
Ayrshire
Carers
Centre)
An adult carer is anyone 18 years or older who cares
unpaid for a relative or friend who needs help because of
an illness, drug or alcohol misuse, disability, mental
health issues or requires extra help as they grow older. 
It is important that carers have a say on the type of
caring they are comfortable with providing and are able
and willing. The time spent caring should not get in the
way of being able to have the same opportunities as
other people.
North Ayrshire Carers Centre offers support
with the following:
• Information on any carers issues e.g.
benefits, respite and transport
• Advice on carers rights
• Contact with other carers
• Help with form-filling
• Advocacy representing carers
• 1:1 support
• Relaxation in the form of alternative
therapies, at locations throughout North
Ayrshire (there is a charge for this
service)
• Support groups at various locations
throughout North Ayrshire
• Outreach
• Training
• Information on Adult Carer Support Plans  
For more information, please contact:
North Ayrshire Carers Centre
207

Page 208

210 
174 High Street, Irvine, KA12 8AN
northayrshire.carers@unity-enterprise.com
01294 311333
Food North Ayrshire
Fairer Food
Network
The North Ayrshire Fairer Food community food network
of larders provide an accessible and affordable source of
food to anyone in these areas who needs it. The larders
are run by our community, for our community.
A map of the fairer food places across North
Ayrshire can be accessed via the below link: 
North Ayrshire Fairer Food Community Food
Places – Google My Maps
North Ayrshire
Food Forum
The North Ayrshire Food Forum pledges to enhance the
well-being of individuals and communities through
access to good food.
elainewright1@north-ayrshire.gov.uk
North Ayrshire
Foodbank
Provide three days nutritionally balanced emergency
food and support to local people who are referred to
them in crisis.
Email: info@northayrshire.foodbank.org.uk
Tel: 01294 601312 (Mon – Fri 10am – 2pm)
Address: 150 A Glasgow Street, Ardrossan,
KA22 8EU
Website - North Ayrshire Foodbank | Helping
Local People in Crisis
Outdoors &
Green Health
Allotments The Arran Community Land Initiative - Their main
objectives are to foster participation in land-based
education, recreation, and sport. 
Eglinton Growers – An allotment society for Irvine,
Kilwinning and surrounding villages. The group promote
the opportunity for physical and mental wellbeing
through gardening and encourage health living through
the local production of fruits/veg/flowers
Organic Growers of Fairlie – members can enjoy the
benefits of gardening in an organic way using raised
beds and polytunnels.
Garnock Valley Allotment Association - was
established to allow local people to start up a plot for the
purpose of growing their own food and improving their
life through horticulture.
Email: arranacli@gmail.com
Website: Home | Acli (arranland.org) 
Email: contactus@eglintongrowers.co.uk
Website: Eglinton Growers – Community
Allotments and Garden Association 
Tel: 07780 727579
Social media - (20+) Facebook 
Email: info@gvaa.co.uk
208

Page 209

211 
Three Towns Growers - are an allotment and
community garden site situated in Ardrossan. The group
provide growing space and educational opportunities to
all members of the community.
West Kilbride Allotment Association – are an
allotments association located just outside of West
Kilbride and have been operational since 2007.
Setting up an Allotment – North Ayrshire Council
Allotments Team can advise on:
Social media - (20+) Facebook 
Email: info@threetownsgrowers.org
Website: Three Towns Growers – Cultivating
Communities
• Setting up a constituted allotment association
• Sources of funding
• Locations of suitable plots
• How to develop and manage land 
Website: About - West Kilbride Allotment
Association (weebly.com)
Contact form: Contact - West Kilbride
Allotment Association (weebly.com)  
Email: allotments@north-ayrshire.gov.uk
Website: Setting up an allotment (north-
ayrshire.gov.uk) 
Community
Gardens
Eglington Community Garden - is an initiative that
embraces horticulture and nature-based activities to
promote positive mental health and wellbeing, inclusion
and equity, and opportunities for volunteering for people
within the community.
Email: lindatedford@north-ayrshire.gov.uk
Tel: 07966 527094
Social media: (20+) Facebook 
Organic Growers of Fairlie: Are sustainable community
garden who grow for themselves and the community.
They have wild areas and wildflower beds, and actively
seek to reduce climate impact with tree planting and
other practices. The group involve the community and
welcome other groups and visitors to their garden.
Tel: 07780 727579
Social media - Facebook
209

Page 210

212 
Clean Up
Crews
Irvine Clean Up Crew
Their mission is to rid the whole town of litter by
empowering every resident to get rid of plastics.
Email: Irvinecleanupcrew@gmail.com
Social media - Facebook 
Three Towns Clean Up Crew
Are group looking to target areas within the Three Towns
of Ardrossan, Saltcoats and Stevenston which are
blighted with litter, following suggestions by locals. 
Email: 3townscleanupcrew@gmail.com
Social media - Facebook 
Garnock Valley Litter Heros
Organise litter picks and help make our towns and
countryside clean.
Social Media - Garnock Valley Litter
Heroes | Facebook 
Kilwinning Community Litter Pickers
Organise litter picks to help make Kilwinning a better
place. 
Social Media - Kilwinning Litter pickers |
Facebook
Overall Health Health &
Social Care
Partnership
Locality
Conversations
The North Ayrshire HSCP Engagement Team host
Locality Conversation events across North Ayrshire twice
per year. These compliment and feed into the HSCP
Locality Planning Forums to allow the priorities to be
discussed by Locality Forums, along with identifying any
new and emerging community needs in relation to health
and social care.
Details of the Locality Conversation events
will be posted via channels below: 
Social Media - North Ayrshire HSCP
(@NAHSCP) / X (twitter.com)   
Website- Home Page (nahscp.org) 
Men’s Sheds Harbourside Men's Shed
The Group encourages groups of men to get together
and participate in activities, normally found in a garden
shed – from engineering to creative writing and
everything in between – for the benefit of men’s health
and wellbeing.
Email:
harboursidemensshed.irvine@gmail.com
Social media - Facebook  
Irvine Newtown Men’s Shed
Tel: 01294 214240
Social Media - Facebook
210

Page 211

213 
The group provides recreational facilities and advances
the social needs, health and wellbeing of men of all ages
and backgrounds living in Irvine and surrounding areas. 
Three Towns Men’s Shed
The group want to eliminate loneliness and isolation
among men by providing friendship and a place to work
together by sharing and learning new skills. 
Garnock Valley Men’s Shed
The group address men’s health, loneliness and social
isolation in the Garnock Valley. They provide free
workshop space and access to free food in a sociable,
friendly and welcoming environment designed to
encourage men to connect with other like-minded
individuals and the wider community. 
Men’s Shed Dalry
A community group who helps support and enhance the
wellbeing of men in Dalry. They offer the Fly Tying,
Model Building, Bicycle Maintenance and Woodworking. 
Email: 3townsmensshed@gmail.com
Social media - Facebook 
Email: gvms@btinternet.com
Social media - Facebook 
Email: mens.shed.dalry@btinternet.com
Social media - Facebook 
Recovery
Groups
There are a number of groups across the six locality
areas in North Ayrshire who support with Prevention,
Early intervention and Recovery relating to alcohol and
drugs. 
(communityjusticeayrshire.org.uk) 
Café Solace Community Café that helps those in recovery to get back
into work by gaining transferable skills through
voilunteering at the Café, 
The Café also provides low-cost food for the community.
Café Solace Kilbirnie
Email: cafesolace123@gmail.com
Facebook: Facebook
Open every Friday at Bridgend Community
Centre for lunch 12-1.30 pm and dinner 5-7
pm
211

Page 212

214 
Café Solace Irvine
Tel: 01294 273741
Facebook: Facebook
Open every Tuesday for dinner from 5-6.30
pm at Fullarton ConneXions. 
Mental Health
Support
Groups
A wide range of wellbeing, emotional and practical
support services are available to residents in North
Ayrshire.
North Ayrshire HSCP Website: Care and
support services (nahscp.org)
North Ayrshire CPP Community Directory :
Housing Registered
Tenant
Organisations
Registered Tenant Organisations are groups of people,
acting in a voluntary capacity. They put forward views
and concerns on behalf of tenants and / or residents in
their area. There are 5 in North Ayrshire.
• Bourtreehill and Broomlands Tenants
& Residents Association
• Castlepark & Eglinton Tenants &
Residents Group
• Hayocks Tenants & Residents
Association
• Redburn Grove Tenants Group
• Saltcoats High Flats Tenants &
Residents Association 
To contact one of our Registered Tenant
Organisations:
Telephone: 01294 324869
Email: tenantparticipation@north-
ayrshire.gov.uk
More info: Register of Tenant Organisations
(north-ayrshire.gov.uk) 
Sheltered
Housing Local
Groups
The Council’s Tenant Participation Team work in
partnership with tenants and customers is key to
delivering excellent housing services to the people of
North Ayrshire.
Telephone: 01294 324869
Email: tenantparticipation@north-
ayrshire.gov.uk 
Further info - Customer Connections
Strategy (north-ayrshire.gov.uk)
212

Page 213

215 
Housing
Forum
The Council’s Tenant Participation Team work in
partnership with tenants and customers is key to
delivering excellent housing services to the people of
North Ayrshire.
Telephone: 01294 324869
Email: tenantparticipation@north-
ayrshire.gov.uk  
Further info - Customer Connections
Strategy (north-ayrshire.gov.uk) 
Tenants
Surveys
The Council’s Tenant Participation Team work in
partnership with tenants and customers is key to
delivering excellent housing services to the people of
North Ayrshire.
Telephone: 01294 324869
Email: tenantparticipation@north-
ayrshire.gov.uk  
Further info - Customer Connections
Strategy (north-ayrshire.gov.uk)
Older People Older
People's
Voice
A North Ayrshire-wide representation forum where
discussion on the real life challenges faced by older
people and provided a networking opportunity to get
older people connected with each other.
Email: Commuityplanning@north-
ayrshire.gov.uk 
Elderly
Forums
There is currently one Elderly Forum in North Ayrshire
based in Irvine. The forum is for people over 50, who
would like to be part of a local group supporting the
interests of senior citizens in the Irvine area.
Campaigning on issues that are relevant to seniors.
Email: Commuityplanning@north-
ayrshire.gov.uk 
Engagement
Hub
Committees
Committees consult with our residents and community
and provide services they want, whether it is a coffee
morning, a health and well-being focus or initiatives to
tackle social isolation and loneliness.
Email: Commuityplanning@north-
ayrshire.gov.uk
Young People Joint Cabinet Joint Cabinets are unique to North Ayrshire in the way
decision makers engage with our young people. These
meetings give the young people a chance to speak to
Cabinet Members, Chief Officers, the Council Leader
Contact: Ask your school if you want to get
involved
213

Page 214

216 
and North Ayrshire Council’s Chief Executive and work
collaboratively to address any issues which may arise
that the young may have identified. Feedback from these
meetings and engagements is formulated into a report to
be actioned by relevant partners.
Open to: Secondary school young people 
P7 Youth
Council
North Ayrshire Youth Council meets three times per year.
The membership is made up of young people from each
locality in North Ayrshire as well as specific young
people from targeted groups. The agenda for each of
the meetings are informed from all of the above areas of
Youth Engagement and any feedback or information
from these meetings are then fed through all areas of
Youth Participation and Engagement, locality
partnerships and relevant partners.
We engage with Primary 7s to allow them to attend with
their school.
Primary schools are offered places and they
allocate pupils to come along
Youth Council
Executive
The Executive Youth Council is North Ayrshire’s
representative voice for young people. This group of
young people consult and engage with their peers,
create local projects and events, engage with key
decision makers and are involved in working groups,
meetings and various workstreams.
The group is open to any young person that wants to
participate
Open to: Young people aged 12+ people living in the
North Ayrshire
To join email youthwork@north-
ayrshire.gov.uk
Young Carers A young carer is someone under 18 years old or who
has reached the age of 18 years and remains a pupil at
school. They take responsibility for the care of family
members or friends who need help due to illness, drug
or alcohol misuse, disability, mental health issues or
need extra help as they grow older.
For more information, please contact:
North Ayrshire Carers Centre
174 High Street, Irvine, KA12 8AN
01294 311333
214

Page 215

217 
LGBTQI
national and
locally
In North Ayrshire there is localised support for young
LGBT people, including: 
• a private Facebook support page (search for
Open Ayrshire)
• LGBT support groups across North Ayrshire for
12 to 18 year olds where you can meet others,
have some fun and be yourself (you can bring a
friend or family member for support). We have
groups in the North Coast, Kilwinning, Garnock
Valley and Irvine. 
LGBT services
These services provide lots of information and support
outside of North Ayrshire. They are a great resource for
you, your parents or anyone that would like to know
more. 
The Steve Retson Project
The Steve Retson Project is a sexual health service for
gay and bisexual men, based in Glasgow. The project
offers full screening for sexually transmitted infections,
HIV testing and counselling for all men who have sex
with men. Please phone: 
Terrence Higgins Trust Scotland
Terrence Higgins Trust (THT) Scotland is the largest HIV
charity in Europe and provides services across Scotland. 
In Ayrshire, THT Scotland provides:
services to gay and bisexual men
support to the wider LGBT community and people who
are HIV positive
Local Contact:
To find out more, please email the Youth
Work Team. youthwork@north-
ayrshire.gov.uk 
The Steve Retson Project
0141 211 8628 to make an appointment
0141 211 8130 for enquiries 
Terence Higgins Trust Scotland
For details of these and other services
offered by THT Scotland, please contact: 
THT Scotland, 134 Douglas Street,
Glasgow, G2 4HF
phone: 0141 332 3838,
email: david.bingham@tht.org.uk
215

Page 216

218 
Services include:
one to one support
outreach
group work for LGBT people
advocacy and support for people living with HIV
training on HIV, homophobia, diversity and sexual health 
Other services
Get Rubbered - a condoms and lube postal
scheme for gay and bisexual men in
Ayrshire, delivered free of charge to your
door on a monthly or bi monthly basis
LGBT Helpline Scotland - for young people
who need support
Scotsgay - the magazine from Scotland for
Lesbians, Gays and Bisexuals
LGBT Youth Scotland - provides help and
support for 13 to 25 year olds
Stonewall Scotland
Equality Network
Mermaids - supporting transgender, non-
binary and gender diverse young people and
their families
British Youth
Council
We empower young people aged 25 and under to
influence and inform the decisions that affect their lives.
We support young people to get involved in their
communities and democracy locally, nationally and
internationally, making a difference as volunteers,
campaigners, decision-makers and leaders. 
Our vision
A world in which every young person is empowered to
create social and political change. 
Our mission
As the national youth council of the UK, the British Youth
Council brings young people together to find their voice
and use to improve the lives of young people. We work
with others to amplify young people’s voices to create an
British Youth Council | Home (byc.org.uk) 
Email us: info@byc.org.uk
Call us: 020 4529 5927
216

Page 217

219 
environment in which young people views are valued,
sought and acted upon. 
Our values
Youth led – young people are active citizens and are
always at the forefront of our work. As a youth-led
charity, young people lead and shape our work through
our governance structures. We support them to define
their own action for change. We champion youth
leadership across all sections of society, evidencing the
benefits of engaging young people in decision making
and delivery and supporting that to happen. 
Collaborative – we actively seek to collaborate with
others to make positive change happen. We seek to
work with relevant partners to add value to our
campaigns and activity, and to be more creative in our
approach to making change happen with and for young
people. And we recognise the skills, knowledge and
experience of young people, volunteers, staff and
partners, and strive to achieve more by maximising the
opportunities that collaboration provides. 
Inclusive – we respect and value diversity and act in a
way that includes all. We ensure that all our activities our
inclusive, recognising the needs of young people across
different communities, and bring young people and
partners together to learn from each other 
Joint Youth
Forum
North Ayrshires youth forums meets four times per year.
The membership is made up of young people from all
locality youth forums, sports leaders, young Syrian
refugees, young carers, care experienced young people
and voluntary youth provisions. The agenda for each of
the meetings are informed by North Ayrshire wide
You can attend this by attending your local
youth forum or youth voice group – for more
details on these please email
youthwork@north-ayrshire.gov.uk
217

Page 218

220 
activities, events or areas of concern where youth
forums to work together. 
Climate
Change
Ambassadors
This group meets fortnightly with young people from
across North Ayrshire that are interested in climate
change, sustainability and green action. This is for S1
plus. You have the opportunity to affect change, design
events and promotional campaigns and be the
representative voice for Climate Change in North
Ayrshire
To join email youthwork@north-
ayrshire.gov.uk
Mental Health
Ambassadors
This programme allows young people who are between
16 and 21 the chance to support and share learning with
other young people who are aged 11 and 12.
The young group are mini ambassadors within their
school community allowing them to further pass on this
learning to help support younger pupils emotional
awareness. As an Ambassadors you will have the
opportunity to complete Mental Health First Aid and/or
the Mental Health UKs Your Resilience.
To join email youthwork@north-
ayrshire.gov.uk
MSYPs In North Ayrshire we have 4 elected Members of Scottish
Youth Parliament. They hold their position for 2 years
and are the local and national representative in ensuring
that the voices of young people are heard and actioned.
If you want to engage with your local MSYP go to
https://syp.org.uk/members/find-your-msyp/. If you are
interested in running as an MSYP you can contact your
school or local Community Worker.
Open to: young people aged 14+ (MSYP), aged 12-25 if
you want to engage with your MSYP
Contact: Contact your local Community
Worker or MSYP.
Equalities
Forum
The equalities forum is an inclusion group for 12 – 18
year olds.
Young people who attend the group, want to be
proactive in their local community, to ensure that all
young people are all equal - not only those who are
protected by the characteristics but allies of these young
To join email youthwork@north-
ayrshire.gov.uk
Twitter Page -
North Ayrshire Corporate Parenting
One Voice
Care
Experienced
218

Page 219

220 
Forum
(Twitter Page)
people too. To lift and empower each other and raise the
voices of young people who may be a part of this group
or represent these characteristics. The project is
designed by the young people's needs and wants, in a
hope to speak truth to power and empower our young
people to make positive change within their communities
in a safe and nurturing environment.
North Ayrshire Champions Board are a group of care
experienced young people who come together to look at
how they can use their views and experiences to help
shape a better care system feeding into The Promise.
The group plan events and outings for young people
which is staffed by North Ayrshire Council's Coporate
Parenting team. 
We have hopes that a new shaped Champions Board
will take place monthly in schools with the hopes to bring
representatives from each school together quarterly to
share their views and plans with one another. 
Currently, the group has been paused due to the young
people moving on to next steps and so we are looking at
our relaunch process.
Laurissa Monaghan -
LaurissaMonaghan@north-ayrshire.gov.uk
New Scots &
Gaelic
Ukrainian
Community in
North
Ayrshire 
Contact Ukraine Support
Email: ukrainesupport@north-
ayrshire.gov.uk
Telephone
01294 445250
Spike Wheat
Scots
We are a community Group whose aim is to support new
Scots living in North Ayrshire
(Spike Wheat Scots) Facebook 
Suas Leis a
Ghaildhlig
All you need is a reasonable singing voice and an
interest in the Gaelic language.
Largs Gaelic Choir
marianne_cain@hotmail.com
Tel: 01475 670187
219

Page 220

220 
220

Page 221

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet
Title: Proposals for Community Investment Fund (CIF)
Expenditure
Purpose: To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects.
Recommendation: That Cabinet:
a) Reviews the enclosed application from the Irvine Locality
Partnership in line with CIF criteria; and
b) Approves the CIF application in relation to Irvine
Cricket Club 
1. Executive Summary 
1.1 Within its budget for 2017-18, North Ayrshire Council provided a funding allocation for
the creation of an innovative fund to enable communities to address the priorities they
have identified through Local Planning Partnerships and within the context of North
Ayrshire Community Planning Partnership’s Fair for All Strategy and the Council’s
Community Wealth Building Strategy. In June 2021, Cabinet approved a further £1m
top-up for the funding, with a further £2m added in November 2021. 
1.2 Locality Partnerships have subsequently continued to work on their local action pans
and are refining proposals for expenditure in line with their locally identified needs. It is
a testament to the dedication of the Locality Partnerships and their community partners
that proposals are now emerging to provide creative approaches to addressing local
challenges. 
1.3 This report brings forward proposals which respond to the specific needs of the local
community, and which have been developed based on local circumstances and
opportunities. 
2. Background 
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they have
identified through Locality Planning Partnerships and within the context of North
Ayrshire Community Planning Partnership’s Fair for All Strategy and the Council’s
Agenda Item 13
221

Page 222

Community Wealth Building Strategy. A further £3m was added to the funding in 2021,
to be distributed among Localities as follows: 
2.2 It was agreed that the CIF awards would range between £5,000 and £100,000 for the
community organisations, as defined in the CIF guidance, in order to support
proposals and projects that connect with: 
• The North Ayrshire Fair for All Strategy, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and Locality priorities;
• North Ayrshire Council’s values, priorities, and business objectives; and
• The Community Wealth Building and Environmental Sustainability and Climate
Change Strategies; 
And will also:
• Fulfil a compelling need and not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in
their way of addressing community challenges and in their request to Locality
Partnerships and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon requests) and efficiently and effectively managed. This can
include an organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and
volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular
basis.
Locality Value of
CIF from
first funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from second
funding
allocation
(June 2021)
Value of CIF
from third
funding
allocation
(Nov 2021)
Total balance
available
Irvine £754,000 £908,858 £290,000 £580,000 £715,142
Kilwinning £286,000 £322,190 £120,000 £240,000 £323,810
Three
Towns
£598,000 £937,561  £240,000 £480,000 £380,439
Garnock
Valley
£390,000 £415,103.04 £150,000 £300,000 £424,896.96
North Coast £468,000 £444,459 £170,000 £340,000 £533,541
Arran £104,000 £125,079 £30,000 £60,000 £68,921
TOTAL £2,600,000 £3,170,113.04 £1,000,000 £2,000,000 £2,429,886.96
222

Page 223

2.3 The proposal development and application process has been agreed as follows: 
• Locality Partnerships should continue to engage with their communities and
stimulate interest in the CIF. Each Locality Partnership will then strategically
access the applications, make links, and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form, which they will decide upon before making a proposal to Cabinet
for final approval.
• The proposal will go to the next suitable Cabinet for final approval. 
2.4 The enclosed application at Appendix 1 has been developed by community
partners and North Ayrshire Council officers and are now recommended for
approval by Cabinet. 
2.5 The Irvine Locality Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Irvine Locality Partnership CIF allocation to date:  £1,624,000
Irvine Digital Officer   £84,604*
Vineburgh & Fullarton Community Enablers  £100,000 
Irvine New Town Mens Shed   £10,000 
Irvine Harbourside Mens Shed   £10,000 
Irvine Youth Hub   £100,000 
Irvine Tennis Club  £100,000 
INPUT   £60,000 
Children's 1st   £97,580 
CHAP  £91,534
BABCA Community Garden  £12,777
Fullarton Outdoor Gym £100,000
Turning Point -  Pathways to Progress  £96,112
Micah Project  £50,000
Balance 
£715,142 
2.6 Proposal: Irvine Cricket Club (£49,500) (see Appendix 1)
2.6.1 Irvine Cricket Club is a not-for-profit local community group, run by volunteers, to promote 
the sport of cricket to everyone within North Ayrshire. Formed almost 200 years ago, the Club
has a focus on growing their youth section and works with KA Leisure and North Ayrshire
Schools to provide access to the sport for children. They aim to give young people a chance to
grow as individuals, become healthier, more confident and form new relationships through sport. 
2.6.2 The club are applying for funding to install a permanent two-bay outdoor fully secured
artificial cricket facility where children and adults can train and practice seven days a week, all
year round. At present, both the weather and the size of the facilities mean they are limited in
how many people can train at the venue. The new facility would allow the Club to more than
double the number of young people who can train in one session and reduce their dependence
on the weather to be able to do so. This will enable them to achieve their aims of providing a
pathway to activity and health for children and young people and support their wider families as
part of a community. 
223

Page 224

2.6.3 Irvine Cricket Club work closely with a range of local partners and aim to ensure they are
inclusive as a club for example by offering kit and clothing recycling programmes which help to
reduce waste and make sure every child has what they need to participate. The project supports
the Irvine Locality Partnership priorities, in particular enhancing mental health and wellbeing and
alleviating poverty. 
3. Proposals 
3.1 That Cabinet: 
a) Reviews the enclosed application from the Irvine Locality Partnership in line with CIF
criteria; and
b) Approves the CIF application in relation to Irvine Cricket Club. 
4. Implications/Socio-economic Duty
Financial
4.1 CIF funding is allocated within existing resources. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community
cohesion and advance community empowerment. Each of the CIF proposals is tested
against that purpose before being presented to Cabinet. 
Climate Change and Carbon 
4.5 Environmental and sustainability along with climate change and carbon reduction
opportunities are considered in relation to each CIF application. This proposal supports
recycle and re- use principles. 
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
strategic aims: 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience
for local people.
• We will have active, inclusive, and resilient communities.
• A Community Wealth Building Council that is efficient and accessible, maximising
224

Page 225

investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 The application supports the following pillars of community wealth building: 
• Financial Power: Listening to communities and local enterprises to maximise the
impact of financial investment and grow local business, enhance innovation and
empower communities.
• Land and Assets: Maximising the function and ownership of local physical assets
for the benefit of communities and enterprises. 
5. Consultation 
5.1 The proposals contained within this report have been developed by the Locality
Partnerships, through consultation with local people, including young people. 
David W. Hammond 
Executive Director (Communities and Housing) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324415. 
Background Papers
Appendix 1: CIF Application Irvine Cricked Club
225

Page 226

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP
The CIF will support proposals and projects that:
• Connect with:
o The Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis.
When to apply and how?
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• Initial interest in a CIF application should be via an expression of interest form. This
will be discussed by the LP or an associated working group.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible:
Elaine Baxter
Locality Officer - Irvine
North Ayrshire Council 
Connected Communities
Redburn Youth Centre
Dickson Drive
Irvine
KA12 9EW
Email: ebaxter@north-ayrshire.gov.uk
Tel: 01294 313593
Mob: 07814418453
For more information see the guidance form here: https://northayrshire.community/wp-
content/uploads/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf 
226

Page 227

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP
1. Details of your organisation
Name of Organisation
Irvine Cricket Club 
Postal Address for Correspondence
Irvine Cricket Club. 
Name of Contact Person Derek Neil
Position in Organisation Junior Convenor/Committee Member
Telephone Number
Email Address
Total amount of funding requested: £49500,
Match funding (if any):
2. Brief description of your organisation
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence.
Irvine Cricket Club is a non for profits, local community group, run by
volunteers to promote the sport of cricket to everyone within North
Ayrshire. Our club was formed in 1836 and we are looking forward to
celebrating 200 years in not too many years ahead. We have 3 adult
teams playing cricket Under Cricket Scotland and playing in the Western
Union cricket League and National Cup competitions. 2 Saturday teams
and a Sunday team that are used to develop both adults and kids ready
for Saturday cricket. Our goal and infrastructure for the past 4 years has
been geared to grow our youth section and provide cricket to boys and
girls through our workings with KA Leisure and the North Ayrshire
schools. Our club attend and run after school classes and take PE
classes during school activities and are involved with School Health
227

Page 228

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP
weeks. We run 3 junior teams at Under 12 and Under 16 age groups.
The schools also bring the kids to our ground as part of activity days and
to take part in school’s competitions. We need these kids to help secure
the clubs future. We are the only remaining cricket club in North Ayrshire
and have a duty to protect the sport. We bring across overseas players
to assist with our youth programme and we already have 6 kids on a
pathway to regional and hopefully Scotland representation in years to
come. We are here to give the youth a chance to grow as individuals,
become healthier and become more confident individuals and form new
relationships with kids their own age and form lifelong bonds and
friendships. Cricket is a minority sport but has an excellent pathway for
kids to be both successful individually and as a team, regionally and
hopefully internationally. 4 years ago we started with a handful of kids
and now have 50 kids regularly attending weekly training. Our annual
Easter and Summer camps have between 40-50 per week attending as
a result of our schools’ activity. Bearing in mind many kids that attend
our camps also play football, as that is the normal in the west of
Scotland, where they train 3 or 4 times a week restricting the numbers
we get to attend our training nights. These camps prove that kids do
have plenty talent, we just need to create a facility where cricket is more
appealing and we retain more of these kids, offering them a greater
return than what football offers them come the age of 14/15. Our club is
open 7 days a week. Junior matches on a Monday and Friday evenings
with festivals twice a month on a Sunday. Kids train on a Wednesday
night. Seniors train Tuesday and Thursday evenings with Matches
Saturday and Sunday with cup competitions midweek on Tuesday and
Wednesday nights.
Our aim is to have 4 junior youth teams at 4 different ages and to have
an independent girls’ team by the end of this summer. Under 13 age
group.
Our main objective is to provide a ready-made facility for both local
North Ayrshire residents and community to use and to allow our facility
to be used for Regional and Representative matches in the future and
be a show case for our Sport within North Ayrshire and the West of
Scotland.
228

Page 229

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP 
3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for. 
Please include: 
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
We are looking to install a permanent 2 bay outdoor fully secured
artificial cricket facility where kids and adults can train and practice 7
days a week, all year round at our cricket club, which will be situated
next to the current changing room facilities and match pitch. Our target
audience for this project will be to the youth and school children of north
Ayrshire schools, as we strive to further our sports business plan of
firstly delivering on a development officer for schools shared between
summer and winter terms, which has been very successful to date, and
as the numbers increase our facilities need to keep up with demand.
Currently we use the grass and one artificial cricket pitch for training
which is very much weather dependant. On many occasions training has
had to be cancelled due to afternoon rain. We are also currently limited
to training a smaller number of kids at any time, which is not ideal when
you want as many kids training when they decide they want to come.
This extra double bay facility will allow us to double if not treble the
number of kids we currently train, as well as making sure the facility is
always available and not weather dependant. With the grass facility we
currently use if any adult games are on, the kids practice must be
cancelled and rearranged which again is not ideal when you want kids to
get into a routine. With it being secured and in a sperate area kids can
train on any given day or evening in a safe environment. This facility will
be used 9 months of the year and be the most important asset at our
club, allowing our continual schoolwork to engage with more kids, get
more kids coming along a permanent location for kid’s activities and
training. The more practice kids do the better they become in both ability
229

Page 230

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP
and inner confidence. Kids would be at our club 3-4 days a week if we
had the correct training facility and that must be a good thing. We would
also be looking to target youth organisations, scouts, BB’s, guides etc to
come and try days knowing we have resources to increase the
attendees. We work very closely with partners WDCU, our league
administrators, Cricket Scotland to assist us with youth led training
programmes and pathway and they are aware of the strides our club has
been making with our MCA- Marress Cricket Academy. We work very
closely with Active schools to help co-ordinate our activities in the
schools, and we are very fortunate enough to have an excellent team of
co-ordinators that share the same goals and visions as ourselves. 
4. What difference will this project make within the locality and to local
services and programmes? 
Please include: 
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities 
Irvine Cricket Club is the last remaining cricket club in North Ayrshire. As the current
custodians of the club and our sport we need to make sure that the youth of today
get the same benefits that old and new members of our club get. One of our main
outcomes is to make sure kids are active, playing a sport they love and enjoy, form
long lasting friendships, in many cases life long, be they best they can be individually
and as part of a team, learning new skills and develop an inner confidence that can
be part of their day-to-day life. Our locality needs as many different and varied
sports/activities for the youth to engage with and try. Health and wellbeing is a
common word, but so true. We have lost the art of using outdoor spaces, playing in
the parks, being out in the fresh air and being generally an active society. This
project will address these issues. Cricket is a sport for all, no matter your gender,
race, social standing, rich or poor, disability or health issues. Any child walking onto
our cricket grounds is all equal. Everyone is treated the same way regardless of
background and perceived social standings. Mums/dads/grans/grandads don’t need
to worry about their son/daughter fitting in, looking different, having to wear different
clothes or not being able to afford equipment. We provide it all. We recycle clothes,
equipment so everyone has their own. Our club really is for everyone. Our club
currently has 8 different nationalities proving our importance to everyone. Kids learn
more from these individuals about society, there homelands etc.  By working this
230

Page 231

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP
way we address inequality, as it is a word that is not in any of our business
plans/models/training guides. We started our MCA- Marress Cricket Academy 2
years ago. We see this as a pivotal part of the local community and we are a “service
provider” for parents/grandparents/guardians to make sure your child has a pathway
to improved fitness, health, wellbeing, where the child can grow, develop, be
confident, form friendships and give them motivation and drive to be better. The
social events we run is also key in bringing families together and meeting people and
others they would not normally do if their kids were not part of the MCA. By doing all
this our individual club goals of having 4 cricket teams at 4 different ages and a
standalone girls team will be easily achievable. We were always very good at what
we did, just did not do enough of it and our development plans are proving it is
working, we are hitting numbers and we are seeing the kids coming through and
enjoying our sport, proving we are a key part of the Irvine community with the
services and programmes we running. This double bay cricket all weather cricket
facility project will allow us to continue the drive forward in delivering for the youth.
Irvine locality partnership has many dedicated priorities, and our project runs
alongside these in many ways. The key one is enhancing our Mental Health and
wellbeing. Sport delivers – cricket delivers. We also do touch on the alleviating
poverty as well- from a parental point of view we make our sport achievable
financially – work collectively to share costs with others, recycle and reuse as
mentioned above. The diagram showing the “strength of the place” is an excellent
tool and one we shall use. As it stands just now out of the 14 points to this compass,
we are strong in 10 of them, rating us at 5/6 in many cases and this project takes us
from a 4 to a 5 and 5 to a 6 in many of these 10 points. 
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
Our main engagement firstly was with Cricket Scotland and how we can develop as
a club, improve our club grading, help improve the kids’ training facilities and get
more kids onto the grass. What is needed to improve the kid’s pathway to making
cricket a serious sport for them to achieve within. We have attended 3 local meetings
with them where 4 representatives were present. We have been working with WDCU
our regional body where development officers, safeguarding officers and regional
junior representatives have been to our ground and helped assess not just what we
231

Page 232

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP
need but where they should be. This is to improve facilities for kids and parents and
allow us to potentially attract regional cricket matches of various ages and degrees
to further put Irvine on the cricketing map as a progressive club and youth provider at
a very high standard. Locally we have taken advice from schoolteachers, other youth
leaders as well as similar sized cricket clubs to obtain relevant information to see just
how important this project is to our development. 
6. How will the project be managed? 
Please include: 
• How the finances will be managed 
• Does the proposed project contribute to volunteering or employment
opportunities in Irvine? Please include the number of volunteering
opportunities and employment opportunities
• If there are any staff requirements, please outline your HR plans 
Our club committee will manage and oversee the project. 2 quotes have been
obtained by reputable companies that are the leading provider of this facility within
the UK and are accredited as such by our governing body.
A site visit will take place by supplier to confirm already agreed location and
suitability. Contracts will be agreed on this, and timeframes implemented for work to
start with due dates.
The winning supplier will be paid 30% plus VAT as a deposit and the remaining on a
satisfied completion and safety testing and certification. Finances will be looked after
by our club treasurer.
Our grounds person will be always present to make sure everything is carried out
and completed as per the contract specifications.
It is expected that the time frame for this project will be almost 3 weeks from start to
finish.
Our coaches and our working committee will visit the project twice weekly to make
sure everything is in order and will be present at sign off when the project is
completed, together with the facility being tested by players.
Our treasurer will conclude the final payment after our insurers will be notified to visit
and make sure they are satisfied before adding it to our club insurances.
There will be no staff requirements for this 3-week project. 
232

Page 233

COMMUNITY INVESTMENT FUND 
IRVINE LOCALITY PARTNERSHIP 
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£) £49500 
Please give a breakdown of cost and recent quotations where appropriate. 
Double bay 2 net outdoor fully enclosed facility - £40000 plus VAT
Spoil removal - £1050 plus VAT
Vermin skirts due to location - £450 plus VAT 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in
place. 
This project will be monitored moving forward as follows. We have weekly registers
of attendees at our ground for training and games. This shows areas used within our
facility. We will continue to monitor in this was as the activity at our ground will
increase due to this facility both in new members to the club, people using the facility
and other teams using it when weather dictates. We are also looking to provide
cricket to new nationalities and hope our increased traffic will allow us more flags on
our country board. Hopefully regional games and festivals will increase, and we hope
to reach some significant figures within the first 12 months of use. 
Evaluation will be the significance this project brings to our club. Having individual
girls and boys training nights, having Irvine cricket teams at every youth level. Being
able to invite schools down to use the facility on “try days” health weeks, school
competitions. We know financially where we are as a club with memberships.
Improving facilities allows greater membership numbers and increased charges to
cover ongoing maintenance and upkeep of this facility. These figures will be part of
our evaluation process as it’s a key indicator on our goal to increase both
participation in numbers and days used. 
233

Page 234

234

Page 235

NORTH AYRSHIRE COUNCIL 
04 June 2024 
Cabinet 
Title:    North Ayrshire Visitor Management Plan 2024 
Purpose:  To seek approval for the North Ayrshire Visitor Management
Plan 2024. 
Recommendation:  That Cabinet approves the North Ayrshire Visitor Management
Plan 2024 provided at Appendix 1. 
1. Executive Summary 
1.1 The North Ayrshire Visitor Management Plan provides a strategic approach to
managing the impact of tourism within the area. The third Visitor Management Plan for
2024 has been informed by a review of issues previously identified in the 2022 and
2023 Plans, considers changes in tourism post-pandemic, ongoing key challenges in
managing the impact of visitors to North Ayrshire and establishes priorities and
actions for managing the impact of visitors during 2024. This report seeks approval of
Plan provided at Appendix 1. 
2. Background 
2.1 The visitor economy is an important sector of North Ayrshire’s economy. In 2022, the
Scottish Tourism Economic Activity Monitor (STEAM) identified that there were 2.9m
visitor days with an economic impact of £229m, supporting 3,391 full time jobs. The
impact of tourism is not only economic and there are a range of effects on our
communities, our environment and place and infrastructure assets. Optimising North
Ayrshire’s visitor experience whilst minimising any adverse impacts of increased
visitor flows will assist in managing the economic impact of tourism and maximising
the environmental and social benefits visitors can create. 
2.2 The 2022 STEAM figures illustrate a return to almost pre-pandemic visitor levels. This
presents an opportunity to continue to review the provision of visitor services to
respond to visitor demands through the Visitor Management Plan in a way that will
bring lasting economic benefits while managing the impact on communities. 
2.3 The first Visitor Management Plan in 2022 was instrumental in helping the Council
secure £65,000 funding from VisitScotland to produce Strategic Tourism Infrastructure
Development Plans for the mainland and islands, which are now in place and are key
to unlocking future rounds of Rural Tourism Infrastructure Funding (RTIF) and other
funding streams over the next five years. The proposed third North Ayrshire Visitor
Management Plan for 2024 is provided at Appendix One. Key actions include:
Agenda Item 14
235

Page 236

• Using our Strategic Tourism Infrastructure Development (STID) Plans to support
funding applications for tourism-related projects.
• Quarterly meetings of the Tourism Forum to support visitor economy activity.
• Developing a proposal for motorhome parking across North Ayrshire.
• Supporting the delivery of the Visitor Pit Stop project across our islands.
• Enhancing the promotion of events taking place in North Ayrshire.
• Continuing to develop the pilot 5G project at Irvine Harbourside
• Considering how our visitor management activities can reflect regional and national
visitor economy strategies.
• Preparing an updated Visitor Management Plan for 2025 to continue to coordinate
visitor management activities across the Council and communicate these. 
2.4 The proposed 2024 Plan identifies priorities and proposals to facilitate and support an
increased level of tourism and visitors to North Ayrshire, as tourism continues to grow.
The process of preparing the Plan included reviewing the actions identified in the 2023
Visitor Management Plan, identifying future actions and assessing those actions
against known issues and priorities. This was overseen by an Elected Member/Officer
forum to guide its development. 
2.5  Key impacts identified through the development of the plan relate to litter, parking and
‘hotspots’ such as motorhome usage in certain locations. Work is underway to review
the provision of motorhome facilities across North Ayrshire. Some of the key areas
identified require longer-term solutions for a range of reasons. 
2.6 The pan-Ayrshire Ayrshire and Arran Visitor Economy Leadership Group (AAVELG)
has developed the Ayrshire and Our Islands Regional Visitor Economy Strategy. This
identifies a regional set of priorities and considers the national tourism strategy
‘Scotland Outlook 2030: Responsible Tourism for a Sustainable Future’ and the
‘National Strategy for Economic Transformation (NSET)’. These strategies provide a
wider context to the economic climate and visitor priorities. An updated Action Plan will
be prepared for 2025. The Visitor Management Plan focuses on local issues and
priorities, while being cognisant of the bigger picture. 
3. Proposals 
3.1 That Cabinet approves the North Ayrshire Visitor Management Plan 2024 provided at
Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial resource required to implement the Visitor Management Plan will be met
from a range of existing service budgets and external funding. The Plan will also
support external funding applications to secure additional resource for delivery. 
Human Resources 
4.2 None. 
236

Page 237

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 It is predicted that the impact of the Plan will have positive equality and social impacts. 
Climate Change and Carbon 
4.5 The Visitor Management Plan aligns with the priorities of the Sustainable North
Ayrshire Strategy. The proposals identified within the Plan will have a positive impact
on environmental resources. 
Key Priorities 
4.6 The implementation of the Visitor Management Plan will support the Council Plan’s
priorities and strategic aims. It will contribute to the key activities of ‘Ensure our
places and spaces where we work and visit are well-maintained and accessible’ and
‘Developing and promoting active travel infrastructure’. 
Community Wealth Building 
4.7 The proposals in the Visitor Management Plan support the delivery of the Council’s
Community Wealth Building strategy. A Community Wealth Building approach will be
adopted to the implementation of the Plan to ensure that it contributes across the
pillars. 
5. Consultation 
5.1 The Visitor Management Plan 2024 has been developed and informed by
engagement with the Elected Member/Officer Tourism Forum, which oversees
strategic tourism matters, and with Council Services and local businesses. Regular
updates on activity and progress of key actions will be supported and promoted
through the Council’s Corporate Communications Team. 
Russell McCutcheon
Executive Director (Place) 
For further information please contact Marnie Ritchie, Interim Senior Manager, Growth
and Investment on MS Teams or via marnieritchie@north-ayrshire.gov.uk. 
Background Papers
North Ayrshire Visitor Management Plan, 2022
North Ayrshire Visitor Management Plan, 2023
237

Page 238

April 2024
238

Page 239

2 
1. Introduction
North Ayrshire includes the coastal towns and
villages of Largs, Fairlie, West Kilbride, Seamill,
Ardrossan, Saltcoats, Stevenston and Irvine, the
inland towns of Kilbirnie, Beith, Dalry and
Kilwinning and the islands of Great Cumbrae, Little
Cumbrae and Arran. Visitors are an important part
of North Ayrshire’s economy. In 2022, there were
2.9m visitor days with an economic impact of
£229m, supporting 3,391 full time jobs1. The
equivalent figures for 2019 (the last ‘normal’ year
before covid), were 3.2m visitor days with an
economic impact of £211.8m, supporting 3,770 full
time jobs. 
The Covid-19 pandemic had a significant impact
on the numbers and types of visitors coming to North Ayrshire between 2020 and
2022 and consequently on our communities and facilities. While the 2022 figures
show a return to an almost pre-pandemic number of visitor days, the increase in
economic impact is largely due to increases in the cost of doing business and many
visitor economy businesses have seen a decrease in profitability. Other challenges,
such as the additional cost and administrative requirements of short-term-let
licensing, have had an impact on the industry, while we continue to respond to a high
number of visitors and the impacts they have on our environment.
This Plan sets out our objectives, the challenges we are responding to, actions taken
in 2023 and our ongoing actions for 2024. These actions are focused on what can be
developed and/or delivered during 2024 with an immediate impact, whilst
acknowledging our longer-term ambitions for the area which will continue to require
longer term planning, development and investment. 
2. Purpose of the Visitor Management Plan
The purpose of the Visitor Management Plan is: 
• to work across the Council to identify actions and interventions which enhance
the experience of our visitors, which in turn support our tourism businesses
and the jobs they sustain for the 2024 peak visitor economy season; and  
• to develop plans which are respectful of our communities and the environment
and deliver lasting economic benefits to North Ayrshire. 
While this Visitor Management Plan addresses short-term issues, the Visitor
Management Plan 2022 was key in helping us secure £65,000 of VisitScotland
funding to produce Strategic Tourism Infrastructure Development Plans for the 
1 Source: Scottish Tourism Economic Activity Monitor (STEAM) data 
North Ayrshire
239

Page 240

3 
mainland and islands, which are now in place and will be key to unlocking future
rounds of Rural Tourism Infrastructure Funding (RTIF) and other funding streams
over the next five years. 
The pan-Ayrshire Ayrshire and Arran Visitor Economy Leadership Group (AAVELG),
comprising representatives from East, North and South Ayrshire Councils,
VisitScotland, Scottish Enterprise and the Ayrshire and Arran Destination Alliance,
developed the Ayrshire and Our Islands Regional Visitor Economy Strategy and Draft
Action Plan in 2023. This identifies a regional set of priorities and considers the
national tourism strategy ‘Scotland Outlook 2030: Responsible Tourism for a
Sustainable Future’ and the ‘National Strategy for Economic Transformation (NSET)’.
A review is underway of the Draft Action Plan to reflect priorities going forward.
Combined, these strategies give a wider context to the economic climate and visitor
priorities, and the Visitor Management Plan focuses on local issues and priorities,
while being cognisant of the national and regional context. 
In addition, North Ayrshire Council leads on the delivery of the Ayrshire Growth Deal
Tourism Programme which will see £23.5m invested in the provision of marine transit
facilities at Cumbrae and Arran and the regeneration of Irvine’s Harbourside area. 
3. Objectives
Our objectives are to optimise our infrastructure and service delivery to ensure these
are managed as we work to:
o Promote North Ayrshire as a great place to live, work, study, visit and invest.
o Promote our key assets.
o Minimise any negative impacts visitors have on communities and the
environment.
o Encourage sustainable visitor patterns by promoting our tourism assets and
potential across all North Ayrshire, including our inland localities.
o Communicate with our visitors while they are in North Ayrshire
o Encourage responsible behaviour.
o Identify interventions for seasonal and temporary challenges.
o Create outdoor opportunities.
o Support eco-tourism and sustainable tourism.
o Disperse visitors throughout the area.
o Encourage visitors to stay longer and spend more money in the area.
o Use events to show off our assets. 
4. Challenges of 2020-23 and Impacts of Covid-19
There was an overall change in behaviour due to the pandemic, which continues to
impact in 2024. Outdoor activities and the spaces we have to offer continue to
appeal to visitors and residents. In particular, popular destinations continue to
240

Page 241

4 
experience strong demand for parking, motorhome accommodation, public
conveniences and an increase in littering, waste, antisocial behaviour and queuing
for ferries at peak times.
Visitors
In 2023 we continued to see an increase in the volume of visitors, as there was still
some reduced confidence in foreign travel which led to the continuing popularity of
daytrips and UK holidays. Some overseas visitors have returned but we are still not
at pre-pandemic levels. National and local visitors who discovered what North
Ayrshire has to offer are continuing to make return visits. Measuring success by
visitor numbers is less worthwhile than measuring success by visitor days and spend
– value from visitors is a more meaningful objective than volume of visitors. Longer
stays mean less impact on the environment caused by travel, and less impact on
communities caused by short-term visits.
Communities/Residents
Geographic pandemic restrictions which forced residents to remain in their local
authority areas led to many North Ayrshire residents discovering assets on their own
doorsteps, taking to our outdoor spaces, parks, beaches, and attractions. This
change in behaviour continued throughout 2023, which is a positive outcome for
wellbeing and mental health, though this has also led to an ongoing demand on our
visitor infrastructure and services and some impact on communities in ‘honeypot’
locations. Some of our spaces have experienced an increase in antisocial behaviour.
Businesses
Staff recruitment and retention remains a challenge for visitor economy businesses,
which makes it difficult to meet the demand posed by high volumes of visitors during
peak times. Our island businesses continue to struggle with the availability of staff
accommodation. Additionally, the dramatic rise in the cost of doing business
(including food, energy costs, short-term let licensing, staff, transport and building
supplies) has continued to put pressure on businesses and impacted growth and
development. Ferry cancellations and a reduced fleet are also having an impact on
island visits and income generation for island businesses.
The requirement for short-term-lets licensing has had an impact on the market. The
extra costs and uncertainty have led to some landlords leaving the market, with a
consequent reduction in available holiday accommodation. Results of research in the
short-term let community on Arran have indicated that not as many owners have left
the market as first feared, but the additional burden on those businesses has
reduced their profitability, meaning we may see more owners exiting the market.
North Ayrshire Council
The increase in use of our spaces by both residents and visitors since 2020 has put
an additional burden on Council services and this looks set to continue in 2024.The
Council has established a Tourism Forum comprised of officers and local Councillors
241

Page 242

5 
which meets quarterly to discuss progress and agree any actions related to visitor
economy activity.  
5. Actions taken in 2023 
A wide range of activities identified in our Visitor Management Plan 2023 were
delivered, including: 
o Delivery of the Streetscene Environmental Skills and Training Academy training
scheme.
o Streetscene operatives working twilight shifts and flexible shift patterns.
o Volunteer support via Streetscene Volunteering Strategy
o Continued improvements to the Ayrshire Coastal Path.
o The launch of a new STEM trail at Eglinton Park, with another on Cumbrae in
development and another proposed at Bourtreehill Park.
o Upgrades of lighting and interpretation (see table below for details).
o Replacement and upgrades of playpark equipment across North Ayrshire.
o Participation in My Beach, Your Beach and Safer Shores campaigns. 
o Ongoing bus corridor improvements.
o Ongoing delivery of the Ardrossan Low Carbon Hub.
o Enhanced promotional support for North Ayrshire events. 
6. Priorities for 2024 
Our priorities for 2024 are to build on the achievements of the 2023 Visitor
Management Plan and keep these under review to ensure we optimise the visitor
experience and wider economic benefit of tourism, recognising the benefit it can
bring to businesses and communities. Key actions include: 
o Updating the Visitor Management Plan to continue to coordinate visitor
management activities across the Council and communicate these.
o Using our Strategic Tourism Infrastructure Development Plans to support funding
applications for tourism-related projects.
o Considering how our visitor management activities can reflect regional and
national visitor economy strategies.
o Continuing the quarterly Tourism Forum to support visitor economy activity.
o Developing a proposal for motorhome parking across North Ayrshire.
o Supporting the delivery of Visitor Pit Stop community projects across our islands.
o Enhancing the promotion of events taking place in North Ayrshire.
o Continuing to develop the pilot 5GIR project at Irvine Harbourside  
242

Page 243

6 
7. 2023/2024 Actions summary 
We have reviewed our Visitor Management Plan 2023 and updated it to reflect our
priorities for 2024. Additionally, there is some scoping of interventions that can be
implemented in future years, recognising that these will assist the Council in taking
advantage of external funding and the capability of partners to deliver services to
improve the visitor experience, to leverage a greater impact in future years and
develop a longer-term strategy. Projects and actions are listed in the table below and
have been themed as follows: 
• Litter Management; 
• Public Transport, Roads and Parking;
• Public Toilets; 
• Playparks and Public Areas; 
• Marine Tourism; 
• Communication, Education and Engagement; 
• Events and Festivals; and 
• Partner Engagement and Activities. 
While not all interventions have been able to be broken down to a quantum of spend,
this plan continues to deliver the £1.5m of action to visitor and place management
actions started in 2022. This excludes the development of capital projects under the
Ayrshire Growth Deal (AGD). 
243

Page 244

2023 Actions  2024 Actions
Litter Management (Streetscene) 
Training and additional resources 
Streetscene
Training Scheme
The ILM (Streetscene Environmental Skills and
Training Academy – Intermediate Labour Market
Initiative) Programme ran with two groups April to Sept
2022 then Oct 2022 to March 2023. This programme
has been successful. Cohort three commenced on 11
April 2023 with twelve new trainees providing
additional capacity for Streetscene to deliver excellent
outdoor experiences to attract visitors. Focus of the
group during next six months is partnership work with
the Ranger Service from Eglinton to enhance park as
visitor destination. 
The Streetscene ILM programme is moving into the third
year from April 2024 and is currently funded to 31 March
2025. The Service intends to explore the options to extend
the programme for 2 years subject to being able to secure
funding. 
Operational Flexibility 
Twilight Shifts Streetscene continued to respond to seasonal
demands and provide services to ensure our coastal
locations are best presented to visitors.
Despite ongoing financial challenges, the Streetscene
service will continue to flex resources to areas of high
demand/high footfall, particularly in coastal locations. The
service is also exploring the financial viability of a compactor
trial for servicing litter bins.   
NAC’s Local Environmental Audit and Management System
(LEAMS) street cleanliness score has improved from 84.6%
in 2023 to 89.1% in 2024.
Other Activities 
Volunteer
Support
Providing equipment and support to community litter
picking groups. Work continued in 2023 with volunteer
groups to build capacity.
Continue to work with volunteer groups to minimise litter and
build capacity. A particular example that arose with the
volunteer groups was the collection and disposable of throw
away vapes. 
244

Page 245

8 
Public Transport, Roads and Parking 
Ferries Largs marshalling works on site and funding secured
to deliver Cumbrae marshalling area in 2023/34. The
Cumbrae works did not progress due to revisions to
the slipway replacement project being undertaken by
Caledonian Maritime Assets Ltd (CMAL).
Largs marshalling works are now complete. Proposed
improvements including queuing and marshalling area for
Cumbrae will be progressed and delivered by CMAL as part
of their slipway replacement plans, subject to funding.
Buses Liaison and engagement with partners and
identification of external funding to improve bus stop
infrastructure, bus route extension and bus lane
congestion measures. Ongoing – funding received
from Strathclyde Partnership for Transport (SPT)
annually for bus corridor improvements.
Delivery of an ongoing programme of bus infrastructure
works informed by the Local Transport and Active Travel
Strategy (LTATS), subject to external funding being secured
from either SPT or Transport Scotland’s Community Bus
Fund.
Largs Town
Centre
Ambassadors 
Following a trial in 2022 the recruitment of tourism
assistants for Largs was not progressed for summer
2023. Concerns were raised around value for money
and funding pressure on the car park fund. Options
being explored for a suitable funding model for 2024.
Action not being progressed in 2024. 
Local Transport
and Active Travel
Strategy Review
The Local Transport and Active Travel Strategy
(LTATS) was approved by Cabinet in October 2023. 
Ongoing delivery of the Local Transport and Active Travel
Strategy (LTATS), subject to securing external funding.
Active Travel Submit funding applications, secure funding and
implement identified active travel and outdoor access
improvements and projects across North Ayrshire.
Continue to submit funding applications, secure funding and
implement identified active travel and outdoor access
improvements and projects across North Ayrshire.
Transport
Implementation
Submit funding applications, secure funding and
implement identified public transport and transport
improvements and projects across North Ayrshire.
Continue to submit funding applications, secure funding and
implement identified public transport and transport
improvements and projects across North Ayrshire.
Islands
Connectivity
Development
Develop the UK Government Community Renewal
Fund funded Islands Connectivity Project to identify
priorities for electric vehicle and bike infrastructure, a
low carbon hub and Mobility as a Service (MaaS.
Feasibility study complete. Active Travel and Transport
Implement the recommendations of the UK Government
Community Renewal Fund funded Islands Connectivity
Project including priorities for electric vehicle and bike
infrastructure, a low carbon hub and Mobility as a Service
(MaaS), subject to external funding. 
245

Page 246

9 
Team seeking suitable funding opportunities to
implement the Islands Connectivity Study Action Plan. 
Islands
Connectivity
Implementation
Secure and align funding to implement the
recommendations of the Islands Connectivity Project
including Islands Infrastructure Fund and Place Based
Investment Programme allocations – quantum of
funding to be confirmed.
Continue to secure and align funding to implement the
recommendations of the Islands Connectivity Project
including Islands Programme and Place Based Investment
Programme allocations – quantum of funding to be
confirmed.
Ayrshire Coastal
Path
development
Improvements to the Largs Promenade and Coastal
Path between Bowencraigs and Aubrey Park. Working
with Sustrans to implement further phases of the
Fairlie Coastal Path. Construction commenced
January 2024.
Largs – Elected Member engagement to inform next steps.
Technical design to follow thereafter as appropriate,
informed by outcome. 
Fairlie – Completion of coastal path construction.
Continue to work with Sustrans to progress work to provide
a coherent, off-road where possible, active travel route from
Ardrossan to the NAC border with Inverclyde.
Ardrossan Low
Carbon Hub
implementation /
Ayrshire Coastal
Path
Development
Delivery of the Ardrossan Low Carbon Hub funded by
the ERDF Low Carbon Travel and Transport Challenge
Fund including North Shore Coastal Path; Ardrossan
Harbour active travel link; and electric vehicle and e-
bike charging hubs at both locations. 
North Crescent Coastal Phase 1 almost complete. 
Ardrossan Harbour path complete. EV charging hubs
have been provided at Ardrossan South Beach and
Ardrossan Harbour. Electric bike charging provided at
South Beach and at Doon the Beach Café, Ardeer.
Completion of North Crescent Coastal Path Phase 1 –
installation of benches and cycleway markings
Delivery of North Crescent Coastal Path Phase 2 (subject to
external funding)
Delivery of Ardrossan Coastal Quarter path (subject to
external funding)
Levelling Up
Fund – Active
Travel Route
Projects
Delivery of the active travel routes in Irvine funded by
the Government’s Levelling Up Fund.
• Heatherhouse Road
• Long Drive
• Riverside Way
• Barassie to Gailes Roundabout
• Strategic Investment Route (River Irvine paths)
Delivery of the low carbon and active travel infrastructure
projects as part of the Levelling Up for Ayrshire –
Commercial and Low Carbon Infrastructure project, subject
to completion of the Levelling Up Round 3 validation and
onboarding process.
246

Page 247

10 
Promoting
Responsible
Motorhome
visitations
Undertake analysis of where additional infrastructure
should be provided to support and direct motorhomes
to the most appropriate locations.
Short-term low-cost interventions have been identified to
mark out motorhome spaces at Lochshore, Ardrossan South
Beach, Irvine Beach Park and Bowencraigs, Largs with
funding being sought for more extensive facility provision.
Public Toilets 
Existing facilities and future funding 
Island Pit Stops Re-purposing and improving existing public toilets (3
on Cumbrae, nine on Arran) to provide better facilities,
supporting increased dwell time and spend on the
islands. Consultation currently underway with the
associated communities ahead of drawing up scope for
each site. 
Support the delivery of the Island Pit Stop project with local
community organisations including finalising designs and
funding allocations. 
Reinstatement Reinstatement/replacement of the Melbourne Park
public toilets in Saltcoats which were fire-damaged in
late 2021.
Facilities Management are undertaking a review of North
Ayrshire Public toilet facilities. The next steps will be
informed by this process and consider the options identified
through the feasibility study funded by the Repurposing
Property Grant Fund.
Refurbishment Refurbishment of the Promenade Toilets in Largs,
financed by the Largs Car Park Fund. Work began in
April 2023.
The refurbishment of the Promenade toilets is now complete
and pay gates have been installed.
Review of assets  Facilities Management are undertaking a review of
North Ayrshire Public toilet facilities.
A community asset transfer has now been agreed for
the Ardrossan South Beach toilet block with ambitious
plans from the Ardrossan Community Group.
Review is ongoing with a report being prepared looking at
options for public conveniences across North Ayrshire. This
will be informed by the consultation with community groups
in Saltcoats and Largs currently underway to assess the
interest from these groups in taking over the running or
ownership of the sites.
Playparks, and public areas 
Upgrade and renew playparks 
Playparks Replacement and upgrade of playpark equipment
across North Ayrshire. 
Phase 1 complete covering coastal and inland areas. 
Phase 2&3 now complete which mainly focused on inland
play areas. Now planning phase 4, continuing to focus on
inland play areas. Phase 5 (final phase) will be in budget
year 25/26.
247

Page 248

11 
Coastal Hub Play
Park, Irvine 
New  As part of the Ayrshire Growth Deal investment at Irvine
Harbourside and subject to approval of the Full Business
Case, works are planned to be on site by October 2024 to
create improved play facilities at Irvine Beach Park for
completion by June 2025. 
Renew benches and picnic tables and upgrade bins 
Benches Programme of replacement assets is almost complete
with benches, wheelchair accessible picnic benches,
new bins at coastal locations installed to provide
facilities for visitors to enjoy promenade areas and
beaches.
The programme of replacement assets is nearing
completion with benches, wheelchair accessible picnic
benches, new bins at coastal locations installed to provide
facilities for visitors to enjoy promenade areas and beaches.
Picnic tables
Bins
Additional visitor and cultural interventions 
Heritage Trails Build on heritage trails and on website created to host
the trails.
Heritage website now launched and fully operational.
Funding secured to carry out a feasibility study into the
creation of an outdoor museum and heritage trail in Largs.
STEM Trails A new STEM trail is complete for Eglinton Park and
work has started on co-creation of the Cumbrae trail
with the local school and the Field Studies Centre,
Millport, taking in the learning from Eglinton.
Identify new opportunities for STEM Trails. Eglinton Trail is
now officially launched. Cumbrae is still in development with
another proposed for Bourtreehill Park, Irvine.
Eglinton Park  New walking routes created, benches added, BBQ
disposal units installed and information video created,
enhanced directional signage installed, outdoor
washroom area created. Classroom still to be
completed and upgrade of all-ability play area is
pending.
Upgrade of the all-ability play area is now complete.
Exploring options for a covered picnic area to enhance
visitors experience during inclement weather. Work is
underway to create a dog park, bringing a new attraction to
the Park and we will continue to develop this in 2024. The
web site requires an update which will be carried out in
2024. Carry out improvements as suggested in the Visit
Scotland assessment of January 2023. Work with partners
to develop a programme of events in the Park including
farmers markets, art exhibitions and craft fairs. Support the
promotion of the Park as a filming location to assist with
attracting visitors post filming / airing.
248

Page 249

12 
Arran Geopark Two seasonal Arran Access Rangers funded by
NatureScot via Arran Access Trust. Rangers liaise with
Streetscene Grounds Supervisor where appropriate.
Collaborate with staff at Arran Geopark and Island Plan -
Community Working Group to engage with the local cultural
and heritage groups to influence the areas of spend
associated with the award from Scottish Government and
deliver outputs for the engagement. 
Interpretation Interpretation panels at Ardrossan Castle and St
Bride's Chapel, Lamlash – St Brides complete,
Ardrossan still in development with local heritage
group.
Install the interpretation boards on site at Ardrossan Castle.
Support Active Travel with interpretation along the new cycle
path at Ardrossan North Shore. Funding has been secured
to install interpretation along the riverside path connecting
Kilwinning Abbey and Eglinton Castle, this will be worked on
in 2024. Work with the local community to create
interpretation at the site of the original Parish Church of
Ardrossan.
Lighting and
interpretation
Upgrading at Kilwinning Abbey Tower – new
interpretation in place at entrance, further interpretation
to follow as part of the Place Making engagement and
funding. Lighting installed and in use for key dates
including Go Purple and Remembrance Day.
New interpretation requires to be installed. Work on the
conservation of the tower will be progressed in 2024, part
funded by the Place Based Investment Programme.
Marine Tourism 
Moorings, transit marinas and step-ashore facilities 
Moorings A payment system was investigated into charging
visitors to use NAC visitor moorings at Arran and
Cumbrae and a business case for cost recovery was
concluded.
The business case recommended that charging be further
explored in line with the development of the AGD Marine
Tourism Programme projects, where third party operators
will be sought to operate and manage the new marina
facilities and moorings. This will be considered further
informed by the development of the AGD project operating
models, leasing arrangements and discussions with future
operators.
Marine Transit
facilities 
The AGD Marine Tourism Programme has progressed
the development of business cases for marine
infrastructure at Arran and Cumbrae. This includes the
Ongoing. Anticipating approval by Government of the
Programme Business Case and subsequent preparation and
approval of Outline Business Case(s) during 2024, which will
249

Page 250

13 
development of a fifty up to 100-berth transit marina at
Millport and a step-ashore transit marine facility at
Lamlash. Development work continues to progress
with communities and stakeholders and the
preparation of UK Green Book Business Cases as
required by Scottish Government and the AGD to
secure investment
enable further detailed development of the marine transit
proposals. 
Communication, Education and Engagement 
Communication, campaigns and enforcement activities 
Targeted
Campaigns
Targeted info to visitors and communities through print,
PR, website and social media (#LoveNorth Ayrshire)
Continued targeted provision of information to visitors and
communities through print, PR, website and social media
(#LoveNorth Ayrshire)
My Beach Your
Beach and Keep
Scotland
Beautiful
Participation in educational campaigns and promotion
of messaging
Continued participation in educational campaigns and
promotion of messaging
Safer Shores  Participation in education and enforcement activities. Continued participation in education and enforcement
activities.
Multi-Agency co-
operation
Multi-agency co-operation to gather intelligence on
unofficial events (e.g., beach parties, car cruises), with
interventions to mitigate effects from litter, noise and
anti-social behaviour.
Continued multi-agency co-operation to gather intelligence
on unofficial events (e.g., beach parties, car cruises), with
interventions to mitigate effects from litter, noise and anti-
social behaviour.
Ayrshire Smiles Promotion of ‘Ayrshire Smiles’ customer-service
training website in conjunction with South and East
Ayrshire Councils. 
Continued promotion of ‘Ayrshire Smiles’ customer-service
training website in conjunction with South and East Ayrshire
Councils. 
5G Event Space
project
Funding has been secured for Smart Columns at the
Great Harbour and Beach Park event spaces. 
Continue to develop a robust solution for connectivity for
large events in North Ayrshire, working with partners in East
and South Ayrshire Councils. 
250

Page 251

14 
Events and Festivals 
Events and Festivals, cultural activities 
Making Waves
Festival
The Scottish Maritime Museum undertook a Summer
Market event in 2023.
Scottish Maritime Museum is planning a Summer Market
event 2024. Work is also underway to consider a ‘Making
Waves’ festival for 2025.
Community Event
Support
Provision of event equipment for community events to
reduce costs and improve event sustainability.
Partially completed, some resources have been
purchased and there is ongoing engagement with
community groups on what additional resources are
needed in 2023.
Software has been purchased to assist groups with planning
and costing up events. Training will be delivered to groups in
its use. 
Scotland's
Themed Years
Year of Stories 2022 events were delivered across
North Ayrshire. 2023 was not a themed year, we await
2024 theme in order to make plans and funding
applications. 
There will be no themed year in 2024. EventScotland is
currently scoping for options and approaches for a possible
2025 themed year which will be announced in 2024 to allow
time for development of events, activities and funding
applications.
Events and
Activities
Delivery of new events and activities at Harbour Arts
Centre, North Ayrshire Heritage Centre, Museum of
the Cumbraes, Irvine Townhouse.
Continued support of exhibition programmes across the
cultural venues with a mix of local artistic talent alongside
hosting touring exhibitions. Building on the huge success of
the Titanic Exhibition as we programme the Heritage Centre
and Museum of the Cumbraes.
Event Calendar Develop an event calendar to ensure we are promoting
events in the area to build our audience and increase
attendance, economic impact and community
participation
An events listing has been compiled and uploaded to the
CPP website, linked from the main Council website and will
be used in social media promotion of local events. Going
forward, a dedicated events calendar will be developed for
the new Council website.
Scotland’s Marine
Tourism
Conference
New action for 2024 North Ayrshire hosted Scotland’s Marine Tourism
Conference which is part of the national Scottish Tourism
Month Programme and aimed at those with an interest in the
marine tourism sector, whether in skills, supply chain,
marketing or development. This aligns with our AGD Marine
Tourism projects.
251

Page 252

15 
Partner Engagement/Activities 
Regional
Partnership
Ayrshire and our islands Visitor Economy Strategy and
Draft Action Plan approved by Regional Economic
Partnership Board in February 2023 and subsequently
by the Ayrshire Economic Joint Committee. Partner
resourcing and governance being explored for delivery. 
Refresh the Ayrshire and Arran Visitor Economy Leadership
Group and develop an updated Action Plan for 2024.
252

Page 253

8. Visitor Management Plan Ambitions 
This plan focuses on identifying early interventions and highlighting developments
which are underway. Larger investments and longer-term projects require
appropriate planning, consultation, review and implementation and by necessity
must form part of a longer-term strategy. The North Ayrshire Council Strategic
Tourism Infrastructure Development Plans cover our longer-term ambitions. 
This Visitor Management Plan is a working document, reviewed periodically and
revised annually. 
There are several strategic themes that require ongoing review and action and to be
informed by infrastructure capacity assessment. In addition to the delivery of the
actions in the Plan, the following priority areas will be reflected on – both in terms of
identifying issues, potential action and resourcing implications: - 
o Reflecting on strategic priorities identified through the Ayrshire Regional
Economic Strategy and the Ayrshire and our Islands Visitor Economy
Strategy and Draft Action Plan
o Reflecting on local strategic priorities, including those informed by the
Ayrshire Growth Deal and the Council’s marine tourism programme.
o Implementation of identified solutions to support motorhomes.
o Proactively identifying potential funding sources from external funders to
support future activities. 
253

Page 254

254

Page 255

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet
Title: Strathclyde Partnership for Transport – Strathclyde
Regional Bus Strategy: Consultation on the Recommended
Options for Improving our Future Bus Network 
Purpose:
To seek approval for the proposed North Ayrshire Council
submission to Strathclyde Partnership for Transport consultation
on the “Recommended Options for Improving our Future Bus
Network”
Recommendation: That Cabinet approves the submission of the proposed
consultation response provided at Appendix Two. 
1. Executive Summary
1.1 The Regional Transport Partnership, Strathclyde Partnership for Transport (SPT), has
launched a public consultation on the Strathclyde Regional Bus Strategy recommended
options for improving our future bus network. The consultation sought views until 13
May 2024. An extension has been provided to the submission of the Council’s formal
response. This report seeks approval for the proposed consultation response provided
at Appendix Two. 
1.2 The consultation consists of Strathclyde Regional Bus Strategy (SRBS): A Consultation
on the Recommended Options for Improving our Future Bus Network which follows the
Options Development and Appraisal Process. Five options for the future delivery of the
regional bus network were appraised. These were: Business As Usual; Voluntary
Partnerships; Bus Service Improvement Partnerships; Local Services Franchising; and
Municipal Bus Company. The consultation is seeking views on the options to be
included for future delivery of the regional bus network. 
2. Background 
2.1 Bus services are a lifeline that many people heavily rely on, with around 70% of all
public transport journeys in the Strathclyde region being taken by bus. They connect
people to school, work, shops, services, family and friends alongside playing a
significant role in tackling climate change, inequality and social isolation. Good quality,
accessible bus services can contribute to improved places, healthier environments,
town centre regeneration, inclusive economic growth, social inclusion and improved
quality of life for communities. 
2.2 Strathclyde Partnership for Transport (SPT) is the largest of the seven Regional
Transport Partnerships (RTPs) across Scotland. The SPT area comprises of the
following council areas: East Dunbartonshire, East Ayrshire, East Renfrewshire,
Glasgow City, Inverclyde, North Ayrshire, North Lanarkshire, Renfrewshire, South
Ayrshire, South Lanarkshire, West Dunbartonshire and the Helensburgh and Lomond
area of Argyll and Bute. SPT’s role involves planning and delivering transport solutions
for all modes of transport across the region, in conjunction with the member Councils
Agenda Item 15
255

Page 256

and industry partners. SPT is central to the region’s transport planning, funding and
delivering socially necessary services, supporting capital investment and working in
partnership to develop the transport system for now and the future. 
2.3 SPT’s work in developing the new Regional Transport Strategy reaffirmed significant
concerns in terms of the efficiency, performance, affordability and overall sustainability
of the bus network in Strathclyde. The development of the SRBS seeks to address
these issues and aims to deliver a clear vision and strategy for the future of bus
services in the region. 
2.4 SPT’s Regional Transport Strategy (RTS) was published in 2023 with a vision that “The
west of Scotland will be an attractive, resilient and well-connected place with active,
liveable communities and accessible, vibrant centres facilitated by high quality,
sustainable and low carbon transport shaped by the needs of all”. It noted that the RTS
Vision will not be achieved without improving the quality and integration of the bus
network. The Transport (Scotland) Act 2019 provides new powers to local transport
authorities, including SPT, to improve local bus services, and these powers will be
explored through development of the SRBS. 
2.5 The need to develop a regional bus strategy was identified through the work
undertaken to develop the RTS. The first stage of this was to prepare a case for
change report that sets out why change in the bus network in Strathclyde is required.
The case for change defined a set of objectives, and from these a set of core policies
was developed to frame the strategy and inform the appraisal of options which will
ultimately determine the strategy and its delivery. 
2.6 Following the Case for Change report in December 2023 an Options Development and
Appraisal process took place. Five options for future delivery of the regional bus
network were appraised. These were: Business As Usual; Voluntary Partnerships; Bus
Service Improvement Partnerships; Local Services Franchising; and Municipal Bus
Company. The five options were appraised against a range of criteria including: 
• SRBS Policies of Level of Service, Affordability, and Service Quality;
• Scottish Transport Appraisal Guidance (STAG) criteria: Environment; Climate
Change; Health, Safety & Wellbeing; Economy; and Equality and Accessibility;
• Implementation criteria of Feasibility, Affordability and Public Acceptability; and
Risk and Uncertainty.
2.7 The five options and the outcome of their appraisal is summarised in Appendix One.
Further details are also provided within SPT’s A Consultation on the Recommended
Options for Improving our Future Bus Network. Based on the findings of the appraisal
process, the recommendations set out by SPT for the future delivery of the regional bus
network are as follows:
• Franchising – SPT should commence work on franchising, in line with the
requirements of the Transport (Scotland) Act 2019.
• Bus Service Improvement Partnerships – SPT should progress with Bus Service
Improvement Partnership (BSIP) arrangements to provide a firm basis for private
and public sector commitments to arrest further passenger decline and improve the
bus network over the medium term.
• Municipal Bus Company – As and when it may be required, SPT will consider
developing business case(s) for small-scale municipal bus company(ies) aimed at
providing socially necessary services in parts of the region where private operators
are currently very limited.
• Business As Usual and Voluntary Partnerships should be ruled out as means to 256

Page 257

deliver a better bus network as more radical intervention as required. 
2.8 The consultation period closed on 13 May 2024. An extension has been provided to the
submission of the Council’s formal response. This report seeks approval for the
proposed consultation response provided at Appendix Two. Key points from the
consultation response include: 
• Recognising that the existing bus services in North Ayrshire and across the wider
region are not delivering for passengers or wider society.
• Outlining the challenges faced by rural Authorities and communities.
• Noting the limited influence of Councils on commercial bus service delivery by
private operators.
• Highlighting that a voluntary partnership could offer several benefits including
improved service coordination and enhanced service quality.
• Strongly supporting ruling out the further consideration of a business as usual
approach in the strategy.
• Opposing the ruling out of further consideration of voluntary partnerships in the
strategy.
• Strongly supporting further consideration in the bus strategy of local services
franchising and Bus Service Improvement Partnerships (BSIPs).
• Supporting further investigation of the opportunities offered by the creation of a
small-scale municipal bus operation in the strategy.
• Highlighting that any future proposals may have a financial impact on the Council
and proposing that additional funding should be made available through Scottish
Government/Transport Scotland to support delivery of the strategy.
• Noting that North Ayrshire is supportive of exploring alternative operating models to
ensure that our communities are well connected and not disadvantaged due to a
lack of sufficient public transport. 
2.9 Following completion of this consultation period, SPT will work with their consultants to
analyse the consultation feedback and consider if any changes should be made to the
recommended approach. Thereafter, they will develop the full bus strategy, working
closely with local authority partners to conclude the remaining work packages, namely: 
• Strategy Development & Consultation
• Finalise Strategy & Delivery Plan
• Strategic Business Case
• Strategic Advisor – Bus Reform and Organisational Change 
2.10 The SRBS is on programme and SPT currently anticipates that it will be completed by
Summer 2025. 
3. Proposals 
3.1 That Cabinet approves the formal submission of the consultation response provided at
Appendix Two. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no direct impacts from this report. 
Human Resources
257

Page 258

4.2 None at this stage. 
Legal 
4.3 None at this stage. 
Equality/Socio-economic
4.4 The development of a Strathclyde Regional Bus Strategy (SRBS) will potentially
provide a mechanism for introducing a fit for purpose and inclusive transport network
for the area thereby reducing socio-economic disadvantage and transport poverty.
Climate Change and Carbon 
4.5 The SRBS aligns with the Council’s Sustainable North Ayrshire Strategy workstreams
of Energy and Transport by potentially reducing emissions and encouraging low
carbon behaviours in relation to energy use and supporting low carbon methods of
travel. Furthermore, it aligns with the Council’s commitment to reduce carbon
emissions through our declaration of a Climate Emergency.
Key Priorities
4.6 Strathclyde Partnership for Transport is seeking views on the recommended options for
improving our future bus network. This will align with the Council’s mission of working
together to improve the lives of our people in North Ayrshire. It will contribute to several
of the Council Plan priorities that focus on Wellbeing, Communities and Local
Democracy, Climate Change, and a Sustainable Council. 
Community Wealth Building
4.7 The Inclusive Growth Diagnostic identified transport as a barrier to inclusive growth at
a local level. The development of a SRBS is vital to local communities and delivering
inclusive growth and Community Wealth Building.
5. Consultation 
5.1 SPT has committed to engaging with stakeholders and the public to actively shape the
SRBS recommend options for improving our future bus network. The consultation has
been promoted by North Ayrshire Council and the Trinity Active Travel Hub via social
media channels. The proposed response was informed by an Elected Members’
briefing session on 14 May 2024 and cross Service engagement. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Claire Fitzsimmons, Interim Senior Manager –
Regeneration on 01294 315305. 
Background Papers
Strathclyde Partnership for Transport (SPT) A Call to Action: The Regional Transport
Strategy for the west of Scotland 2023-38 (RTS)
Strathclyde Regional Bus Strategy – Case for Change
Strathclyde Regional Bus Strategy – Options Appraisal Report
Strathclyde Regional Bus Strategy – A Consultation on the Recommended Options for
Improving our Future Bus Network.
258

Page 259

Appendix One 
The following table summarises the five options for future delivery of the regional bus network: 
Delivery
Model
Description Rationale for considering option
Business as
Usual
Business as usual is the way the bus network is delivered now. This option allows other options to be
compared against the current situation
to understand the difference in costs
and benefits that may be delivered
through organising the bus market
differently.
Voluntary
Partnership
Bus operators and public sector partners may come together to improve the
bus network through agreeing, on a voluntary basis, to provide or deliver
improvements to services and infrastructure or other local policies to support
bus services. There is no legal basis or enforcement mechanism for voluntary
partnerships and parties can leave the partnership at any time.
This option is available to Local
Transport Authorities and bus operators,
either working together or on an
operator-only basis, and has not been
discounted through any previous work by
SPT.
Bus Service
Improvement
Partnership
(BSIP)
A BSIP is a formal partnership between a Local Transport Authority* (or
Authorities) and one or more bus operators. In the model, the Local Transport
Authority* is responsible for making a Partnership Plan and Scheme (or
Schemes), which are developed and agreed with bus operators and other
relevant partners. The Plan sets out policies and objectives to be achieved
through the BSIP and the Scheme (or Schemes) imposes service standards
on operators and specifies the facilities to be provided or measures to taken by
the LTA to support the bus network. This model differs from a voluntary
partnership in that there is a legal basis for the Plan and Scheme and,
therefore, elements of the Scheme can be enforced.
This option is available to Local
Transport Authorities under the Transport
(Scotland) Act 2019, and has not been
discounted through any previous work by
SPT.
Local
Services
Franchising
Local services franchising is a system that allows a Local Transport Authority*
to award exclusive rights to an operator to run certain bus services for a set
period. In Scotland, the Local Transport Authority* must first put in place a
This option is available to Local
Transport Authorities under the Transport
(Scotland) Act 2019, and has not been
259

Page 260

franchise framework setting out what local services are to be provided, the
standards to which the services are to be provided, and any additional facilities
or services that are to be provided. Under this franchise framework, the Local
Transport Authority* then enters into franchise agreements with bus operators,
awarded through competitive processes, to deliver the specified services and
standards.
discounted through any previous work by
SPT.
Municipal
bus company
A municipal bus company is an operator of bus services owned by a Local
Transport Authority*. A municipal bus company can be formed from the
purchase of an existing bus or coach company or the creation of a new
company. Municipal bus companies compete for the market in the same way
as privately owned bus companies. Currently, there are no municipal bus
companies in the SPT area.
This option is available to Local
Transport Authorities under the Transport
(Scotland) Act 2019, and has not been
discounted through any previous work by
SPT.
*Note: The Transport (Scotland) Act 2001 defines a “Local Transport Authority*” as either (a) a local authority; or (b) the Strathclyde Passenger Transport Authority. 
The following tables provide a summary of the appraisal of the options undertaken by SPT’s consultants:
260

Page 261

-
OPTIONS 
BUSINESS AS
USUAL
VOLUNTARY
PARTNERSHIP  BSIP FRANCHISING MUNICIPAL BUS
OPERATIONS 
TPOs 
" " 
10
Increase affordabillty of the busnetwork
" "
10
Reliability and punctuality
" "to
Network identity 10 10
Ticketing "" I I ""to
Interchanges and bus stops 10
Increase the Information to
attractiveness
of the bus
network Customer support and feedback
Changesto services
10
I to
Vehicles and depots to 
Drivers to
Safety and security - to
261

Page 262

OPTIONS 
BUSINESS AS
USUAL
VOLUNTARY
PARTNERSHIP  BSIP FRANCHISING MUNICIPAL BUS
OPERATIONS
Customer charter [ to ]
Data and monitoring 10 10 10 
Environment 10
Climate change 10 ]
STAG criteria Health, safety and wellbeing to 
Economy to 
Equality and accessibility X to 
Feasibility  Minor consideration Moderate
consideration  Major consideration Moderate
consideration 
Affordability Minor consideration Moderate
consideration  Major consideration  Major consideration Moderate
consideration
Public acceptability Moderate negative
consideration
Moderate negative
consideration
Moderate positive
consideration
Major positive
consideration
Minor positive
consideration 
Indicative peakvehicle requirements +200 vehicles +260 vehicles 
Indicative additional annual bus kms +8-l0m +20-2Sm
262

Page 263

BUSINESS AS 
PARTNERSHIP   
Estimated MEC benefits per annum (2024 prices)     
+£20-40m +£50-80m 
+£40-60m +£45-8Sm 
0-Sm 20-2Sm 35-40m
Oeliverability and acceptability risks  Low 
Complexity of operation  Low High
Short to medium-   
Timescales and program risks 
term term term term
Some program risk, Some program risk, High program risk High program risk
mitigated by low mitigated by modest due to uncertainty due to uncertainty
ambition ambition of process of process
263

Page 264

INTRODUCTION
Purpose of this research
In 2023, Strathclyde Partnership for Transport (SPT) commenced work on the Strathclyde Regional Bus
Strategy (SRBS). The SRBS is SPT’s process to determine a preferred strategy to improving the bus
network and set the direction of bus policy in the region. SPT has now developed a set of
recommendations to guide the development and implementation of its bus strategy. 
SPT has commissioned SYSTRA, an independent transport consultancy, to consult with stakeholders
and the general public to understand the extent of support on these recommendations.
This survey
SPT is keen to get your feedback on whether you feel these are the right recommendations, and why.
Your feedback is important so that SPT can understand the extent of support for its recommendations
and whether they should consider amending their approach before moving into the next stage of the
bus strategy process.
We would be very grateful if you would take the time to complete the survey, which will take
approximately 10 minutes. The feedback that you can provide will help SPT to further develop the bus
strategy for the region and consider if any changes should be made to the recommendations. You are
able to provide a response to the survey from now until Monday 13th May 2024.
If you would prefer to fill in a paper version of the questionnaire, you can request a paper version be
posted to your household by emailing the team at RTS@spt.co.uk.
Your data
All survey responses are confidential and results will be analysed and reported anonymously by
SYSTRA. The research complies with the Market Research Society Professional Code of Conduct and
General Data Protection Regulation (GDPR). You can withdraw from the research at any time.
The survey will ask you for some basic contact information for the purposes of ensuring the
authenticity of responses, as well as asking about your level of support or opposition on the different
options. Those responding on behalf of an organisations will also be asked to provide some basic
details about their organisation. Those responding as an individual will be asked about the area they
live in and their current travel behaviour.
You have rights in relation to how your personal data is handled and you can find full details by clicking
here.
0. Are you happy to proceed with the survey?
Please select one
X Yes 
No
264

Page 265

ABOUT YOU
These first few questions are to understand a little bit more about you / your organisation. 
1. Are you completing this questionnaire as an individual or on behalf of an organisation?
Please select one 
I am responding as an individual
X I am responding on behalf of an organisation 
2. What is the name of the organisation that you are responding on behalf of?
Please enter your organisation’s name below 
3. Which of the following best describes your organisation?
Please select one 
Bus operator
X Local authority 
Other organisation 
4. In which local authority area does your organisation primarily operate?
Please select all that apply 
Argyll and Bute 
East Ayrshire 
East Dunbartonshire 
East Renfrewshire 
Glasgow City 
Inverclyde
X North Ayrshire 
North Lanarkshire 
Renfrewshire 
South Ayrshire 
South Lanarkshire 
West Dunbartonshire 
5. Please provide your name, job title, and email address below.
Note, this information is being requested for the purposes of ensuring the authenticity of
responses. A list of all organisations that respond to the consultation will also be included
in reporting, but will not be linked to responses. Your details will not be used for any other
purpose.
Please enter your name and email address below.
Name: David Hilditch
Job title: Interim Active Travel and Transport Manager
Email: dhilditch@north-ayrshire.gov.uk
North Ayrshire Council
265

Page 266

FEEDBACK ON RECOMMENDATIONS
Over the last nine months, SPT has been considering a number of ways, or options, that the
future bus network could be delivered. More detail on these options can be found within the
Strathclyde Regional Bus Strategy Consultation document. SPT has appraised each option to
understand how well each one could help with the delivery of a better bus network, based on
their anticipated benefits, costs and any implementation issues.
After reviewing the evidence and appraisal findings, SPT has developed a set of
recommendations to guide the development and implementation of the bus strategy. These
next few questions are to understand whether you think these are the right recommendations
and why.
266

Page 267

1.1.1.1 Business as Usual and Voluntary Partnerships
SPT is proposing to rule out business as usual and voluntary partnerships for further
consideration in its bus strategy. These options, and the reasons for ruling them out, are
described in brief below. 
6. To what extent do you support or oppose SPT’s recommendation to rule out
‘business as usual’ and ‘voluntary partnerships’ for further consideration in the bus
strategy?
Please select one for each option 
Rule out business as
usual
Rule out voluntary
partnerships
Strongly support X 
Somewhat support  
Neither support nor oppose  
Somewhat oppose  X
Strongly oppose  
Don’t know  
Business as usual describes the existing bus network. Operators are free to run any service,
set their own fares and choose their own vehicles, subject to meeting safety and operating
standards and applicable government policies such as Low Emission Zones. Evidence suggests
that with this option, it is highly unlikely that the cycle of decline will be broken. SPT also
anticipate that continuing with business as usual is unacceptable to most stakeholders and
communities.
Voluntary partnerships are when bus operators and public sector partners come together to
improve the bus network through agreeing, on a voluntary basis, to provide or deliver
improvements to services and infrastructure or other local policies to support bus services.
The option appraisal process found no evidence in the region to suggest that voluntary
partnerships are likely to break the cycle of bus decline.
267

Page 268

1.1.1.2 Local services franchising and Bus Service Improvement Partnerships
SPT is recommending that they begin work on local services franchising, in line with the
requirements of the Transport (Scotland) Act 2019. SPT is also recommending that they work
with partners to develop Bus Service Improvement Partnerships while franchising is
developed. 
7. To what extent do you support or oppose SPT’s recommendation to take forward
local services franchising and BSIPs?
Please select one for each option 
Take forward Local
services franchising Take forward BSIPs
Strongly support X X
Somewhat support  
Neither support nor oppose  
Somewhat oppose  
Strongly oppose  
Don’t know  
Local services franchising is a system that allows a Local Transport Authority to plan the bus
network and to award exclusive rights to an operator to run certain bus services for a set
period of time. Under this franchise framework, the Local Transport Authority then enters
into franchise agreements with bus operators, generally awarded through competitive
processes, to deliver the specified services and standards. SPT believes franchising offers the
greatest certainty in delivering an improved bus network for the region in the long term.
Bus Service Improvement Partnerships (BSIPs) are a statutory partnership between a Local
Transport Authority (or authorities) and one or more bus operators. This model differs from
a voluntary partnership in that there is a legal basis for the Plan and Scheme(s) and, therefore,
elements of the Plan and Scheme(s) can be enforced. SPT believes BSIPs play an important
role in delivering key improvements for the bus network, including bus priority measures to
improve reliability, ahead of implementing local services franchising.
268

Page 269

1.1.1.3 Municipal bus company
SPT is proposing to further investigate the opportunity offered by the creation of a small-scale
municipal bus operation to target provision in areas where there is a lack of commercial
services or as an operator of last resort. 
8. To what extent do you support or oppose SPT’s recommendation to further
investigate the opportunities offered by the creation of a small-scale municipal bus
operation?
Please select one 
Strongly support
X Somewhat support 
Neither support nor oppose 
Somewhat oppose 
Strongly oppose 
Don’t know
A municipal bus company is an operator of bus services owned by a Local Transport Authority.
A municipal bus company can be formed from the purchase of an existing bus or coach
company or the creation of a new company. Municipal bus companies compete for the
market in the same way as privately owned bus companies.
269

Page 270

9. If you wish, please use the box below to explain why you support or oppose any of
SPT’s recommendations. 
Rule out
business as
usual
In Strathclyde, bus services are a lifeline that many people heavily rely on,
with around 70% of all public transport journeys in the region being taken
by bus. Fewer people overall however are using bus. With bus fares,
nationally, increasing in real terms by 25% in the past 10 years whilst the
cost of motoring fell by 5% in real terms. This makes conditions more
difficult for people who are dependent upon bus travel and makes bus even
less attractive for anyone who can use alternative transport. In the current
system, operators are under increasing pressure to concentrate on more
profitable routes (and less on more marginal but essential services). 
The Council recognises that the existing bus services in North Ayrshire and
across the wider region are not delivering for passengers or wider society
within Strathclyde. We are experiencing a substantial level of bus service
and network contraction under the current operating model for the
provision of bus services. As these services are run on a commercial basis
by private operators, the Council has limited scope in influencing their
delivery. The Council notes recent case for change report by SPT indicating
some key issues including:
• Above inflation increases to bus fares
• Sustained patronage decline
• Shrinking network coverage
• Congestion induced delays 
We would also highlight the challenges of delivering bus services for island
and rural communities in North Ayrshire and across the wider SPT area, due
to the lower population densities, longer distances between destinations
and higher operational costs. 
We would agree that continuing with business as usual does not address
the current decline and poor level of service. Therefore, we strongly
support the proposal to rule this out.
Rule out
voluntary
partnerships
A voluntary partnership could offer several benefits between local
authorities and bus operators:
270

Page 271

• Improved Service Coordination: By collaborating, local authorities
and bus operators can better coordinate routes and schedules,
leading to more efficient and comprehensive service coverage.
• Enhanced Service Quality: Cooperation can lead to improvements
in service quality, including better-maintained vehicles, cleaner
facilities, and more responsive customer service.
• Increased Ridership: A well-coordinated partnership can make
public transportation more attractive to passengers, leading to
increased ridership and reduced congestion on roads.
• Community Engagement: Involving both local authorities and bus
operators in decision-making processes can help ensure that the
needs and preferences of the community are considered and
addressed.
• Innovation and Adaptation: Collaboration can foster innovation in
public transportation, such as the integration of new technologies
for ticketing, scheduling, and route optimization. 
Overall, a voluntary partnership between local authorities and bus
operators can lead to a more efficient, reliable, and sustainable public
transportation system that benefits both the community and the
environment. 
Entering a voluntary partnership would have limited financial impact on the
Council. However as noted in the consultation there would be no legal
requirements on either party which could be problematic. 
Whilst we would not necessarily envisage voluntary partnerships being a
long-term solution, there is merit in its continuation whilst other proposals
are phased in, hence we ‘somewhat oppose’ the proposal to rule this out. 
Take forward
local services
franchising
The North Ayrshire Inclusive Growth Diagnostic identified transport as a
barrier to inclusive growth and in particular as a limiting factor to and
preventing people from accessing employment and training opportunities.
Several contributing factors were identified including the: frequency of
transport; connections between transport modes; cost; and shift patterns
exacerbating transport constraints. Halting the decline in patronage and
improving service provision is therefore vital to local communities,
inclusive growth and supporting modal shift to sustainable travel.
271

Page 272

The proposal to take forward local services franchising is welcomed. This
will enable those who are closest to communities and best placed to
understand their needs are provided with the tools to address them
through the provision of required services. To ensure best value and value
for money, it is important that services can be packaged to balance surplus
and subsidy across the bus network within the area. To provide a
sustainable and planned approach to the shift in provision to meet the
needs of communities will require additional funding to establish services
to support new and increased patronage.
Although there may be a financial impact on the Transport Authority (which
could be either SPT or the Council) we would strongly support taking forward
local services franchising. We would however propose that additional
funding should be made available through Scottish Government/Transport
Scotland to support this. 
Take forward
BSIPs
Similar to a voluntary partnership, Bus Service Improvement Partnerships
(BSIPs) could deliver multiple benefits to a) leading to a more efficient,
reliable, and sustainable public transportation system that benefits both
the community and the environment. BSIPs offer potential to deliver
greater information provision, a more consistent standard of service
across the region and improved ticketing. However as indicated in the
report, an ambitious BSIP, though, is heavily dependent on funding
availability and is likely to require substantial new investment for
operating and infrastructure improvements. A key long-term challenge
with BSIPs is that they do not provide any certainty that service
improvements will continue after the BSIP agreements expire, even if the
public sector infrastructure investment has been delivered.
Some initial discussions have taken place between the three Ayrshire
authorities and SPT to discuss options for establishing a Bus Services
Improvement Partnership. We are keen for these discussions to
progress and for alternative operating models to be explored as
appropriate. 
Although there may be a financial impact on the Council, we would
strongly support taking forward BSIPs. We would however propose that
additional funding should be made available through Scottish
Government/Transport Scotland to support this.
272

Page 273

Previous North Ayrshire Council administrations have strongly advocated
for improved bus service provision for example through municipalised bus
services. Following the enactment of the Transport (Scotland) Act 2019,
and SPT proposing the development of the SRBS, it was considered prudent
for this to be investigated through the SRBS rather than locally within North
Ayrshire. 
Further
investigate
municipal
bus
operations
Although there would be a financial impact on the Transport Authority
(either SPT or Council) we would strongly support investigating municipal
bus operations further. We would however propose that additional funding
should be made available through Scottish Government/Transport
Scotland to support this.
We would strongly note that there are significant operational, logistical and
financial considerations that would require to be taken into account by the
Local Transport Authority considering a municipal bus operation. This could
include operator licencing, garage premises, specific arrangements for
registration of vehicles/services, driver hours regulations, TUPE staffing
arrangements, staffing requirements, financial aspects (wages, insurance,
PLI), GDPR, union arrangements etc. We would therefore welcome detailed
discussion on which organisation the most appropriate operating transport
authority would be and consideration of the most appropriate scale of
operations.
273

Page 274

10. Have you read any of the impact assessments that accompany the bus strategy
consultation document?
X Yes 
No 
Don’t know 
11. If you would like to make any comments on the impact assessments, please leave
these below. 
We note that the option appraisal process has been informed by the following impact
assessments:
•
•
•
•
Equality Impact Assessment
Fairer Scotland Duty Impact Assessment
Island Communities Impact Assessment
Children’s Rights and Wellbeing Impact Assessment
We welcome the assessments carried out to inform this process and are satisfied that the
needs of our island communities will be taken into account during this process.
274

Page 275

FINAL COMMENTS
12. Finally, if you have any further comments related to the consultation on the bus
strategy recommendations, please enter them here. 
Regarding the new provisions included within the Transport (Scotland) Act 2019, the
existing arrangements for the provision of bus services is not working in many areas,
particularly in North Ayrshire. Currently these services are run on a commercial basis by
private operators and, as such, the Council has limited scope in influencing their delivery.
The Regional Transport Partnership, Strathclyde Partnership for Transport (SPT), supports
socially necessary bus services where there is no provision, by commercial bus operators.
Funds however are limited and therefore we appreciate the need to carefully consider the
number of passengers who are likely to use a service, the cost per passenger carried and
whether there are other public transport options available before deciding whether they
can subsidise a service. 
The North Ayrshire Inclusive Growth Diagnostic identified transport as a barrier to inclusive
growth at a local level. The provision of high-quality opportunities for public transport for
everyday journeys is vital to local communities and delivering inclusive growth and
Community Wealth Building. North Ayrshire is therefore keen to explore other operating
models to ensure that our communities are well connected and not disadvantaged due to
a lack of sufficient public transport. 
North Ayrshire Council launched Scotland’s first Community Wealth Building strategy in
2020. One of the 5 pillars within the strategy is plural ownership of the economy which
advocates for more diverse range of business models with greater local/community
ownership invested in the local economy. Business models advocated include cooperative,
social enterprise, employee owned and municipalisation. These models have proved to be
more resilient to economic shocks and consideration of further support to encourage these
models would be welcomed. We have also declared a Climate Emergency and do not wish
to see a rise in private car ownership and vehicle kilometres due to the public transport
network not meeting the needs of our communities. 
Rural and island communities face different challenges to those within urban areas due to
the constraints of delivering bus services in these areas due to the lower population
densities, longer distances between destinations and higher operational costs. These
challenges are evidenced by the contraction of commercial bus services in our rural areas,
particularly the Garnock Valley and the full service on the Isle of Arran being subsidised by
SPT. Limited transport options in these areas can result in dependence on cars, poor access
275

Page 276

That’s all of our questions. Thank you so much for your time.
Please submit this response through the online questionnaire or email to RTS@spt.co.uk
to services, facilities and employment opportunities and social isolation. The Strategy
should therefore consider the full range of operating models to address these challenges. 
We are therefore fully supportive of the work being undertaken to progress a SRBS and will
continue to engage in its development.
276

Page 277

NORTH AYRSHIRE COUNCIL 
4 June 2024 
Cabinet
Title: North Ayrshire Burial Grounds 
Purpose: To update the Cabinet on the review of burial grounds capacity
and future provision of cemeteries in North Ayrshire.
Recommendation: That Cabinet; 
• Notes significant progress has been made since the
previous report in 2016 with cemetery extensions delivered
at Knadgerhill, High Road, Dalry, West Kilbride and Kilbride
(Lamlash) as well as walls repairs and other infrastructure
works.
• Notes a new cemetery at Redston, Kilwinning is complete.
• Notes a site has been identified for a new cemetery in
Kilbirnie and is being progressed.
• Notes that work is underway to identify a suitable site for a
new cemetery in Ardrossan.
• Notes it has not been possible to identify a suitable site for
extension or construction of a new Sannox cemetery, Arran.
• Agrees that when Sannox cemetery has no further capacity,
alternative existing burial grounds on Arran will require to be
used.
• Notes a comprehensive assessment of available burial
space within all existing cemeteries has been carried out.
• Agrees options will continue to be assessed for cemeteries
with less than 10 years capacity remaining – Dalry, High
Road, Brisbane Glen.
• Notes that future funding requirements will be considered as
part of the Capital Plan refresh.
.
1. Executive Summary 
1.1 Under the Burial & Cremation (Scotland) Act 2016, local authorities have a duty to
provide burial grounds.  The statutory duty is to provide at least one burial ground
within the area of the local authority. In 2013 Cabinet agreed to adopt a locality
approach for the provision of cemeteries in North Ayrshire.  The principle of this
approach was that once a cemetery reaches capacity another cemetery within that
locality would be used, ensuring at least one cemetery was provided within each
locality. 
1.2 In October 2016, Cabinet agreed to extend the existing cemeteries at Knadgerhill
(Irvine), High Road (Stevenston), Dalry, West Kilbride and Kilbride (Lamlash, Isle of
Arran).  Cabinet also agreed to create new cemeteries within Kilwinning and Kilbirnie. 
Agenda Item 16
277

Page 278

It was also noted that 3 cemeteries on the Isle of Arran (Brodick, Sannox and Shiskine)
were reaching capacity and that further investigation was required into possible
extension sites. Whilst a move away from a locality approach wasn’t specifically
agreed, the spirit of the decision was to move away from this. 
1.3 Knadgerhill (Irvine), High Road (Stevenston), Dalry, West Kilbride and Kilbride
(Lamlash) cemetery extensions are all now complete.   
1.4 The new cemetery for Kilwinning, namely Redston Cemetery, is also complete.  In
respect of Kilbirnie, it has proved difficult to find a suitable location that meets the
needs of the Scottish Environment Protection Agency (SEPA) but a site has now been
identified. 
1.5 As for Arran, Brodick has over 10 years capacity and Shiskine has over 20 years
capacity. Sannox has 5 years capacity. No alternative sites have been identified and
therefore it is proposed that once capacity is exhausted at Sannox then burials take
place at another cemetery on the Island, chosen by the family. 
1.6 In parallel with the above extension work, a range of investment requirements were
identified including roads, walls and other infrastructure improvements at a number of
sites, most of which has now been actioned.  Other wall repair work is continuing. 
2. Background 
2.1 Under the Burial & Cremation (Scotland) Act 2016 local authorities have a duty to
provide at least one burial ground within the area.  Cabinet agreed to adopt a locality
approach for the provision of cemeteries in North Ayrshire in 2013.  This means that
once a cemetery reaches capacity another cemetery within that locality would be used,
ensuring at least one cemetery is provided within each locality. 
2.2 In North Ayrshire there are 45 burial grounds under the responsibility of North Ayrshire
Council.  Of these, 27 are closed for new lairs (still accommodating interments in
existing lairs where Right of Burial and remaining capacity exist for the grave) and 18
have provision for new lairs. 
2.3 In October 2016 Cabinet agreed to extend the existing cemeteries at Knadgerhill
(Irvine), High Road (Stevenston), Dalry, West Kilbride and Kilbride (Lamlash). Cabinet
also agreed to create new cemeteries for Kilwinning and Kilbirnie.  It was also noted
that 3 cemeteries on the Isle of Arran were reaching capacity and further investigation
was required into possible extensions sites. Whilst a move away from a locality
approach wasn’t specifically agreed, the spirit of the decision was to move away from
this. 
2.4 In terms of progress to date, extensions for Knadgerhill (Irvine), High Road
(Stevenston), Dalry, West Kilbride and Kilbride (Lamlash) are all complete.  The new
cemetery for Kilwinning, Redston Cemetery, is also complete.   
2.5 Investigations have been carried out at Brodick, Sannox and Shiskine cemeteries. 
Additional ground for lairs has been identified at Brodick and Shiskine which results in
both sites having over 10 years capacity remaining.  Sannox has only 5 years capacity
remaining and it is intended that once capacity is exhausted Sannox burials will be
redirected to Lochranza churchyard, or another cemetery on the island of the family’s
choosing.
278

Page 279

2.6 In parallel with the above cemetery extension work, a programme of inspections was
undertaken which confirmed infrastructure investment requirements for a range of sites
including wall, road and other improvements.  Significant wall repairs were carried out
at Beith Auld Kirk in 2017, boundary wall rebuilt at Knadgerhill Cemetery in 2017 along
with some carriageway resurfacing in 2018.  Wall repairs and carriageway resurfacing
works were carried out in Haylie Brae Cemetery (Largs) in 2019 and resurfacing work
was done at Millport, Kilbirnie and Beith in 2019.  The creation of additional ‘ashes only’
plots, removal of an internal wall and boundary wall repairs were carried out at
Ardrossan Cemetery in 2020. 
2.7 Whilst there has been a gradual increase in cremations compared to burials (69.4%
cremations in Scotland in 2018 increased to 71.66% in 2022) at this moment in time, in
the short term, it has little effect on burial capacity and forecast needs. 
2.8 The current status for cemeteries with less than 10 years capacity is as follows: 
Arran locality 
Sannox has an estimated 5 years remaining and there are 5 other cemeteries in Arran
with capacity of 10 years or more. 
It is recommended that alternative cemeteries on Arran are used when Sannox
cemetery is full. 
North Coast & Cumbrae 
Brisbane Glen, Largs has an estimated 5 years remaining and it is proposed to develop
the ground to the rear of the site which is owned by the Council and has planning
permission approved. This is a relatively low- cost solution and will be funded from the
cemeteries extensions, walls and infrastructure holding fund. 
Kilwinning 
No capacity issues, Redston Cemetery has sufficient capacity. 
Irvine 
No capacity issues, Dreghorn, Knadgerhill and Shewalton all have sufficient capacity. 
3 Towns 
Ardrossan has an estimated 5 years capacity remaining and PMI are currently looking
at possible locations for a new site. 
In the interim, options are being explored within Ardrossan Cemetery to extend
capacity by removing paths, shrubs etc. This may well increase the capacity and
negate the need for a new cemetery in the short term. 
It was planned to extend High Road for 10 years but due to tender cost increases this
was reduced to 6 years capacity. There is suitable land, owned by the Council, to
extend further subject to budget being made available. 
Garnock Valley
279

Page 280

Dalry has an estimated six years capacity and Kilbirnie has an estimated 1 – 2 years
capacity. 
There is an area of land within Dalry Old Cemetery that may be suitable for burials, and
this is being investigated, subject to budget being made available for this extension. 
In respect of Kilbirnie, significant effort has been made to identify suitable land for a
burial ground in Kilbirnie, which has proved difficult due to Scottish Environment
Protection Agency (SEPA) legislation and areas prone to flooding. However, land has
now been identified at the site of the former Garnock Academy (Moorpark) for a new
cemetery.  The existing cemetery has an estimated 1 -2 years capacity remaining with
a burial rate of approximately 19 new lairs per year.   
Initial findings on the proposed site are encouraging and suggest that site topography,
drainage and soils would meet legislative criteria for a burial ground. 
At the former Garnock Academy (Moorpark) site the intended phase 1 of the scheme
would provide a further 12 years capacity for Kilbirnie at this location with the option for
further extension in later years.   
Discussions with Scottish Environment Protection Agency are ongoing to confirm their
requirements. 
An Engineering Consultant has been appointed to develop design proposals to prepare
a Scheme design cost estimate. The latest estimate is that a budget of £1.45m to
£1.7m is needed for a cemetery providing around 231 burial lairs for Phase 1, with
associated access road and infrastructure for operatives. 
There is currently a budget allocation of £1,502,000 for the development of a new
cemetery for Kilbirnie. Officers are working with the Engineering Consultant to review
potential options to reduce costs. 
2.9 Options will continue to be developed for those cemeteries with less than 10 years
capacity (Ardrossan, Dalry and High Road Stevenston) to inform financial investment
requirements, to allow consideration of funding as part of the Capital Budget
Programme review. 
2.10  In respect of the walls and infrastructure works, whilst significant progress has been
made with these, it is inevitable that further investment will be required on safety
grounds as walls deteriorate through time. Therefore, proposals and costs will also be
developed to help inform future capital budget programming and investment for these
works.  
3. Proposals 
3.1 It is proposed that Cabinet: 
• Notes significant progress has been made since the previous report in 2016 with
cemetery extensions delivered at Knadgerhill, High Road, Dalry, West Kilbride and
Kilbride (Lamlash) as well as walls repairs and other infrastructure works.
• Notes a new cemetery at Redston, Kilwinning is complete.
• Notes a site has been identified for a new cemetery in Kilbirnie and is being
280

Page 281

progressed.
• Notes that work is underway to identify a suitable site for a new cemetery in
Ardrossan.
• Notes it has not been possible to identify a suitable site for extension or construction
of a new Sannox cemetery, Arran.
• Agrees that when Sannox cemetery has no further capacity, alternative existing
burial grounds on Arran will require to be used.
• Notes a comprehensive assessment of available burial space within all existing
cemeteries has been carried out.
• Agrees options will continue to be assessed for cemeteries with less than 10 years
capacity remaining – Dalry, High Road, Brisbane Glen.
• Notes that future funding requirements will be considered as part of the Capital Plan
refresh. 
4. Implications/Socio-economic Duty
Financial
4.1 Budget of £1,502,000 is already in place for a new cemetery in Kilbirnie. Largs
Brisbane Glen will be funded from the existing cemeteries holding budget. Additional
funding will be required to develop additional burial space for Ardrossan, Dalry and
High Road. The review of walls and infrastructure requirements will also require
funding. This will be considered as part of the Capital Budget Programme review. 
Human Resources 
4.2 None. 
Legal 
4.3 The Council has an obligation under the Burial & Cremation (Scotland) Act 2016 to
provide at least one burial ground in its area. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 The Scottish Environment Protection Agency will be consulted on developments for
new sites. 
Key Priorities 
4.6 This contributes to the Council Plan priority of ensuring North Ayrshire is well
connected with effective infrastructure. 
Community Wealth Building 
4.7 Opportunities for community wealth building will be considered as part of the
construction tender processes for proposed work. 
5. Consultation
281

Page 282

5.1 Consultation takes place with PMI on a regular basis for new cemeteries, cemetery
extensions, walls and infrastructure. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Neighbourhood
Services, on 01294 324890. 
Background Papers
0
282