NORTH AYRSHIRE COUNCIL 
04 June 2024 
Cabinet 
Title:    North Ayrshire Visitor Management Plan 2024 
Purpose:  To seek approval for the North Ayrshire Visitor Management
Plan 2024. 
Recommendation:  That Cabinet approves the North Ayrshire Visitor Management
Plan 2024 provided at Appendix 1. 
1. Executive Summary 
1.1 The North Ayrshire Visitor Management Plan provides a strategic approach to
managing the impact of tourism within the area. The third Visitor Management Plan for
2024 has been informed by a review of issues previously identified in the 2022 and
2023 Plans, considers changes in tourism post-pandemic, ongoing key challenges in
managing the impact of visitors to North Ayrshire and establishes priorities and
actions for managing the impact of visitors during 2024. This report seeks approval of
Plan provided at Appendix 1. 
2. Background 
2.1 The visitor economy is an important sector of North Ayrshire’s economy. In 2022, the
Scottish Tourism Economic Activity Monitor (STEAM) identified that there were 2.9m
visitor days with an economic impact of £229m, supporting 3,391 full time jobs. The
impact of tourism is not only economic and there are a range of effects on our
communities, our environment and place and infrastructure assets. Optimising North
Ayrshire’s visitor experience whilst minimising any adverse impacts of increased
visitor flows will assist in managing the economic impact of tourism and maximising
the environmental and social benefits visitors can create. 
2.2 The 2022 STEAM figures illustrate a return to almost pre-pandemic visitor levels. This
presents an opportunity to continue to review the provision of visitor services to
respond to visitor demands through the Visitor Management Plan in a way that will
bring lasting economic benefits while managing the impact on communities. 
2.3 The first Visitor Management Plan in 2022 was instrumental in helping the Council
secure £65,000 funding from VisitScotland to produce Strategic Tourism Infrastructure
Development Plans for the mainland and islands, which are now in place and are key
to unlocking future rounds of Rural Tourism Infrastructure Funding (RTIF) and other
funding streams over the next five years. The proposed third North Ayrshire Visitor
Management Plan for 2024 is provided at Appendix One. Key actions include:

Page 2

• Using our Strategic Tourism Infrastructure Development (STID) Plans to support
funding applications for tourism-related projects.
• Quarterly meetings of the Tourism Forum to support visitor economy activity.
• Developing a proposal for motorhome parking across North Ayrshire.
• Supporting the delivery of the Visitor Pit Stop project across our islands.
• Enhancing the promotion of events taking place in North Ayrshire.
• Continuing to develop the pilot 5G project at Irvine Harbourside
• Considering how our visitor management activities can reflect regional and national
visitor economy strategies.
• Preparing an updated Visitor Management Plan for 2025 to continue to coordinate
visitor management activities across the Council and communicate these. 
2.4 The proposed 2024 Plan identifies priorities and proposals to facilitate and support an
increased level of tourism and visitors to North Ayrshire, as tourism continues to grow.
The process of preparing the Plan included reviewing the actions identified in the 2023
Visitor Management Plan, identifying future actions and assessing those actions
against known issues and priorities. This was overseen by an Elected Member/Officer
forum to guide its development. 
2.5  Key impacts identified through the development of the plan relate to litter, parking and
‘hotspots’ such as motorhome usage in certain locations. Work is underway to review
the provision of motorhome facilities across North Ayrshire. Some of the key areas
identified require longer-term solutions for a range of reasons. 
2.6 The pan-Ayrshire Ayrshire and Arran Visitor Economy Leadership Group (AAVELG)
has developed the Ayrshire and Our Islands Regional Visitor Economy Strategy. This
identifies a regional set of priorities and considers the national tourism strategy
‘Scotland Outlook 2030: Responsible Tourism for a Sustainable Future’ and the
‘National Strategy for Economic Transformation (NSET)’. These strategies provide a
wider context to the economic climate and visitor priorities. An updated Action Plan will
be prepared for 2025. The Visitor Management Plan focuses on local issues and
priorities, while being cognisant of the bigger picture. 
3. Proposals 
3.1 That Cabinet approves the North Ayrshire Visitor Management Plan 2024 provided at
Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial resource required to implement the Visitor Management Plan will be met
from a range of existing service budgets and external funding. The Plan will also
support external funding applications to secure additional resource for delivery. 
Human Resources 
4.2 None.

Page 3

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 It is predicted that the impact of the Plan will have positive equality and social impacts. 
Climate Change and Carbon 
4.5 The Visitor Management Plan aligns with the priorities of the Sustainable North
Ayrshire Strategy. The proposals identified within the Plan will have a positive impact
on environmental resources. 
Key Priorities 
4.6 The implementation of the Visitor Management Plan will support the Council Plan’s
priorities and strategic aims. It will contribute to the key activities of ‘Ensure our
places and spaces where we work and visit are well-maintained and accessible’ and
‘Developing and promoting active travel infrastructure’. 
Community Wealth Building 
4.7 The proposals in the Visitor Management Plan support the delivery of the Council’s
Community Wealth Building strategy. A Community Wealth Building approach will be
adopted to the implementation of the Plan to ensure that it contributes across the
pillars. 
5. Consultation 
5.1 The Visitor Management Plan 2024 has been developed and informed by
engagement with the Elected Member/Officer Tourism Forum, which oversees
strategic tourism matters, and with Council Services and local businesses. Regular
updates on activity and progress of key actions will be supported and promoted
through the Council’s Corporate Communications Team. 
Russell McCutcheon
Executive Director (Place) 
For further information please contact Marnie Ritchie, Interim Senior Manager, Growth
and Investment on MS Teams or via marnieritchie@north-ayrshire.gov.uk. 
Background Papers
North Ayrshire Visitor Management Plan, 2022
North Ayrshire Visitor Management Plan, 2023

Page 4

April 2024

Page 5

2 
1. Introduction
North Ayrshire includes the coastal towns and
villages of Largs, Fairlie, West Kilbride, Seamill,
Ardrossan, Saltcoats, Stevenston and Irvine, the
inland towns of Kilbirnie, Beith, Dalry and
Kilwinning and the islands of Great Cumbrae, Little
Cumbrae and Arran. Visitors are an important part
of North Ayrshire’s economy. In 2022, there were
2.9m visitor days with an economic impact of
£229m, supporting 3,391 full time jobs1. The
equivalent figures for 2019 (the last ‘normal’ year
before covid), were 3.2m visitor days with an
economic impact of £211.8m, supporting 3,770 full
time jobs. 
The Covid-19 pandemic had a significant impact
on the numbers and types of visitors coming to North Ayrshire between 2020 and
2022 and consequently on our communities and facilities. While the 2022 figures
show a return to an almost pre-pandemic number of visitor days, the increase in
economic impact is largely due to increases in the cost of doing business and many
visitor economy businesses have seen a decrease in profitability. Other challenges,
such as the additional cost and administrative requirements of short-term-let
licensing, have had an impact on the industry, while we continue to respond to a high
number of visitors and the impacts they have on our environment.
This Plan sets out our objectives, the challenges we are responding to, actions taken
in 2023 and our ongoing actions for 2024. These actions are focused on what can be
developed and/or delivered during 2024 with an immediate impact, whilst
acknowledging our longer-term ambitions for the area which will continue to require
longer term planning, development and investment. 
2. Purpose of the Visitor Management Plan
The purpose of the Visitor Management Plan is: 
• to work across the Council to identify actions and interventions which enhance
the experience of our visitors, which in turn support our tourism businesses
and the jobs they sustain for the 2024 peak visitor economy season; and  
• to develop plans which are respectful of our communities and the environment
and deliver lasting economic benefits to North Ayrshire. 
While this Visitor Management Plan addresses short-term issues, the Visitor
Management Plan 2022 was key in helping us secure £65,000 of VisitScotland
funding to produce Strategic Tourism Infrastructure Development Plans for the 
1 Source: Scottish Tourism Economic Activity Monitor (STEAM) data 
North Ayrshire

Page 6

3 
mainland and islands, which are now in place and will be key to unlocking future
rounds of Rural Tourism Infrastructure Funding (RTIF) and other funding streams
over the next five years. 
The pan-Ayrshire Ayrshire and Arran Visitor Economy Leadership Group (AAVELG),
comprising representatives from East, North and South Ayrshire Councils,
VisitScotland, Scottish Enterprise and the Ayrshire and Arran Destination Alliance,
developed the Ayrshire and Our Islands Regional Visitor Economy Strategy and Draft
Action Plan in 2023. This identifies a regional set of priorities and considers the
national tourism strategy ‘Scotland Outlook 2030: Responsible Tourism for a
Sustainable Future’ and the ‘National Strategy for Economic Transformation (NSET)’.
A review is underway of the Draft Action Plan to reflect priorities going forward.
Combined, these strategies give a wider context to the economic climate and visitor
priorities, and the Visitor Management Plan focuses on local issues and priorities,
while being cognisant of the national and regional context. 
In addition, North Ayrshire Council leads on the delivery of the Ayrshire Growth Deal
Tourism Programme which will see £23.5m invested in the provision of marine transit
facilities at Cumbrae and Arran and the regeneration of Irvine’s Harbourside area. 
3. Objectives
Our objectives are to optimise our infrastructure and service delivery to ensure these
are managed as we work to:
o Promote North Ayrshire as a great place to live, work, study, visit and invest.
o Promote our key assets.
o Minimise any negative impacts visitors have on communities and the
environment.
o Encourage sustainable visitor patterns by promoting our tourism assets and
potential across all North Ayrshire, including our inland localities.
o Communicate with our visitors while they are in North Ayrshire
o Encourage responsible behaviour.
o Identify interventions for seasonal and temporary challenges.
o Create outdoor opportunities.
o Support eco-tourism and sustainable tourism.
o Disperse visitors throughout the area.
o Encourage visitors to stay longer and spend more money in the area.
o Use events to show off our assets. 
4. Challenges of 2020-23 and Impacts of Covid-19
There was an overall change in behaviour due to the pandemic, which continues to
impact in 2024. Outdoor activities and the spaces we have to offer continue to
appeal to visitors and residents. In particular, popular destinations continue to

Page 7

4 
experience strong demand for parking, motorhome accommodation, public
conveniences and an increase in littering, waste, antisocial behaviour and queuing
for ferries at peak times.
Visitors
In 2023 we continued to see an increase in the volume of visitors, as there was still
some reduced confidence in foreign travel which led to the continuing popularity of
daytrips and UK holidays. Some overseas visitors have returned but we are still not
at pre-pandemic levels. National and local visitors who discovered what North
Ayrshire has to offer are continuing to make return visits. Measuring success by
visitor numbers is less worthwhile than measuring success by visitor days and spend
– value from visitors is a more meaningful objective than volume of visitors. Longer
stays mean less impact on the environment caused by travel, and less impact on
communities caused by short-term visits.
Communities/Residents
Geographic pandemic restrictions which forced residents to remain in their local
authority areas led to many North Ayrshire residents discovering assets on their own
doorsteps, taking to our outdoor spaces, parks, beaches, and attractions. This
change in behaviour continued throughout 2023, which is a positive outcome for
wellbeing and mental health, though this has also led to an ongoing demand on our
visitor infrastructure and services and some impact on communities in ‘honeypot’
locations. Some of our spaces have experienced an increase in antisocial behaviour.
Businesses
Staff recruitment and retention remains a challenge for visitor economy businesses,
which makes it difficult to meet the demand posed by high volumes of visitors during
peak times. Our island businesses continue to struggle with the availability of staff
accommodation. Additionally, the dramatic rise in the cost of doing business
(including food, energy costs, short-term let licensing, staff, transport and building
supplies) has continued to put pressure on businesses and impacted growth and
development. Ferry cancellations and a reduced fleet are also having an impact on
island visits and income generation for island businesses.
The requirement for short-term-lets licensing has had an impact on the market. The
extra costs and uncertainty have led to some landlords leaving the market, with a
consequent reduction in available holiday accommodation. Results of research in the
short-term let community on Arran have indicated that not as many owners have left
the market as first feared, but the additional burden on those businesses has
reduced their profitability, meaning we may see more owners exiting the market.
North Ayrshire Council
The increase in use of our spaces by both residents and visitors since 2020 has put
an additional burden on Council services and this looks set to continue in 2024.The
Council has established a Tourism Forum comprised of officers and local Councillors

Page 8

5 
which meets quarterly to discuss progress and agree any actions related to visitor
economy activity.  
5. Actions taken in 2023 
A wide range of activities identified in our Visitor Management Plan 2023 were
delivered, including: 
o Delivery of the Streetscene Environmental Skills and Training Academy training
scheme.
o Streetscene operatives working twilight shifts and flexible shift patterns.
o Volunteer support via Streetscene Volunteering Strategy
o Continued improvements to the Ayrshire Coastal Path.
o The launch of a new STEM trail at Eglinton Park, with another on Cumbrae in
development and another proposed at Bourtreehill Park.
o Upgrades of lighting and interpretation (see table below for details).
o Replacement and upgrades of playpark equipment across North Ayrshire.
o Participation in My Beach, Your Beach and Safer Shores campaigns. 
o Ongoing bus corridor improvements.
o Ongoing delivery of the Ardrossan Low Carbon Hub.
o Enhanced promotional support for North Ayrshire events. 
6. Priorities for 2024 
Our priorities for 2024 are to build on the achievements of the 2023 Visitor
Management Plan and keep these under review to ensure we optimise the visitor
experience and wider economic benefit of tourism, recognising the benefit it can
bring to businesses and communities. Key actions include: 
o Updating the Visitor Management Plan to continue to coordinate visitor
management activities across the Council and communicate these.
o Using our Strategic Tourism Infrastructure Development Plans to support funding
applications for tourism-related projects.
o Considering how our visitor management activities can reflect regional and
national visitor economy strategies.
o Continuing the quarterly Tourism Forum to support visitor economy activity.
o Developing a proposal for motorhome parking across North Ayrshire.
o Supporting the delivery of Visitor Pit Stop community projects across our islands.
o Enhancing the promotion of events taking place in North Ayrshire.
o Continuing to develop the pilot 5GIR project at Irvine Harbourside

Page 9

6 
7. 2023/2024 Actions summary 
We have reviewed our Visitor Management Plan 2023 and updated it to reflect our
priorities for 2024. Additionally, there is some scoping of interventions that can be
implemented in future years, recognising that these will assist the Council in taking
advantage of external funding and the capability of partners to deliver services to
improve the visitor experience, to leverage a greater impact in future years and
develop a longer-term strategy. Projects and actions are listed in the table below and
have been themed as follows: 
• Litter Management; 
• Public Transport, Roads and Parking;
• Public Toilets; 
• Playparks and Public Areas; 
• Marine Tourism; 
• Communication, Education and Engagement; 
• Events and Festivals; and 
• Partner Engagement and Activities. 
While not all interventions have been able to be broken down to a quantum of spend,
this plan continues to deliver the £1.5m of action to visitor and place management
actions started in 2022. This excludes the development of capital projects under the
Ayrshire Growth Deal (AGD).

Page 10

2023 Actions  2024 Actions
Litter Management (Streetscene) 
Training and additional resources 
Streetscene
Training Scheme
The ILM (Streetscene Environmental Skills and
Training Academy – Intermediate Labour Market
Initiative) Programme ran with two groups April to Sept
2022 then Oct 2022 to March 2023. This programme
has been successful. Cohort three commenced on 11
April 2023 with twelve new trainees providing
additional capacity for Streetscene to deliver excellent
outdoor experiences to attract visitors. Focus of the
group during next six months is partnership work with
the Ranger Service from Eglinton to enhance park as
visitor destination. 
The Streetscene ILM programme is moving into the third
year from April 2024 and is currently funded to 31 March
2025. The Service intends to explore the options to extend
the programme for 2 years subject to being able to secure
funding. 
Operational Flexibility 
Twilight Shifts Streetscene continued to respond to seasonal
demands and provide services to ensure our coastal
locations are best presented to visitors.
Despite ongoing financial challenges, the Streetscene
service will continue to flex resources to areas of high
demand/high footfall, particularly in coastal locations. The
service is also exploring the financial viability of a compactor
trial for servicing litter bins.   
NAC’s Local Environmental Audit and Management System
(LEAMS) street cleanliness score has improved from 84.6%
in 2023 to 89.1% in 2024.
Other Activities 
Volunteer
Support
Providing equipment and support to community litter
picking groups. Work continued in 2023 with volunteer
groups to build capacity.
Continue to work with volunteer groups to minimise litter and
build capacity. A particular example that arose with the
volunteer groups was the collection and disposable of throw
away vapes.

Page 11

8 
Public Transport, Roads and Parking 
Ferries Largs marshalling works on site and funding secured
to deliver Cumbrae marshalling area in 2023/34. The
Cumbrae works did not progress due to revisions to
the slipway replacement project being undertaken by
Caledonian Maritime Assets Ltd (CMAL).
Largs marshalling works are now complete. Proposed
improvements including queuing and marshalling area for
Cumbrae will be progressed and delivered by CMAL as part
of their slipway replacement plans, subject to funding.
Buses Liaison and engagement with partners and
identification of external funding to improve bus stop
infrastructure, bus route extension and bus lane
congestion measures. Ongoing – funding received
from Strathclyde Partnership for Transport (SPT)
annually for bus corridor improvements.
Delivery of an ongoing programme of bus infrastructure
works informed by the Local Transport and Active Travel
Strategy (LTATS), subject to external funding being secured
from either SPT or Transport Scotland’s Community Bus
Fund.
Largs Town
Centre
Ambassadors 
Following a trial in 2022 the recruitment of tourism
assistants for Largs was not progressed for summer
2023. Concerns were raised around value for money
and funding pressure on the car park fund. Options
being explored for a suitable funding model for 2024.
Action not being progressed in 2024. 
Local Transport
and Active Travel
Strategy Review
The Local Transport and Active Travel Strategy
(LTATS) was approved by Cabinet in October 2023. 
Ongoing delivery of the Local Transport and Active Travel
Strategy (LTATS), subject to securing external funding.
Active Travel Submit funding applications, secure funding and
implement identified active travel and outdoor access
improvements and projects across North Ayrshire.
Continue to submit funding applications, secure funding and
implement identified active travel and outdoor access
improvements and projects across North Ayrshire.
Transport
Implementation
Submit funding applications, secure funding and
implement identified public transport and transport
improvements and projects across North Ayrshire.
Continue to submit funding applications, secure funding and
implement identified public transport and transport
improvements and projects across North Ayrshire.
Islands
Connectivity
Development
Develop the UK Government Community Renewal
Fund funded Islands Connectivity Project to identify
priorities for electric vehicle and bike infrastructure, a
low carbon hub and Mobility as a Service (MaaS.
Feasibility study complete. Active Travel and Transport
Implement the recommendations of the UK Government
Community Renewal Fund funded Islands Connectivity
Project including priorities for electric vehicle and bike
infrastructure, a low carbon hub and Mobility as a Service
(MaaS), subject to external funding.

Page 12

9 
Team seeking suitable funding opportunities to
implement the Islands Connectivity Study Action Plan. 
Islands
Connectivity
Implementation
Secure and align funding to implement the
recommendations of the Islands Connectivity Project
including Islands Infrastructure Fund and Place Based
Investment Programme allocations – quantum of
funding to be confirmed.
Continue to secure and align funding to implement the
recommendations of the Islands Connectivity Project
including Islands Programme and Place Based Investment
Programme allocations – quantum of funding to be
confirmed.
Ayrshire Coastal
Path
development
Improvements to the Largs Promenade and Coastal
Path between Bowencraigs and Aubrey Park. Working
with Sustrans to implement further phases of the
Fairlie Coastal Path. Construction commenced
January 2024.
Largs – Elected Member engagement to inform next steps.
Technical design to follow thereafter as appropriate,
informed by outcome. 
Fairlie – Completion of coastal path construction.
Continue to work with Sustrans to progress work to provide
a coherent, off-road where possible, active travel route from
Ardrossan to the NAC border with Inverclyde.
Ardrossan Low
Carbon Hub
implementation /
Ayrshire Coastal
Path
Development
Delivery of the Ardrossan Low Carbon Hub funded by
the ERDF Low Carbon Travel and Transport Challenge
Fund including North Shore Coastal Path; Ardrossan
Harbour active travel link; and electric vehicle and e-
bike charging hubs at both locations. 
North Crescent Coastal Phase 1 almost complete. 
Ardrossan Harbour path complete. EV charging hubs
have been provided at Ardrossan South Beach and
Ardrossan Harbour. Electric bike charging provided at
South Beach and at Doon the Beach Café, Ardeer.
Completion of North Crescent Coastal Path Phase 1 –
installation of benches and cycleway markings
Delivery of North Crescent Coastal Path Phase 2 (subject to
external funding)
Delivery of Ardrossan Coastal Quarter path (subject to
external funding)
Levelling Up
Fund – Active
Travel Route
Projects
Delivery of the active travel routes in Irvine funded by
the Government’s Levelling Up Fund.
• Heatherhouse Road
• Long Drive
• Riverside Way
• Barassie to Gailes Roundabout
• Strategic Investment Route (River Irvine paths)
Delivery of the low carbon and active travel infrastructure
projects as part of the Levelling Up for Ayrshire –
Commercial and Low Carbon Infrastructure project, subject
to completion of the Levelling Up Round 3 validation and
onboarding process.

Page 13

10 
Promoting
Responsible
Motorhome
visitations
Undertake analysis of where additional infrastructure
should be provided to support and direct motorhomes
to the most appropriate locations.
Short-term low-cost interventions have been identified to
mark out motorhome spaces at Lochshore, Ardrossan South
Beach, Irvine Beach Park and Bowencraigs, Largs with
funding being sought for more extensive facility provision.
Public Toilets 
Existing facilities and future funding 
Island Pit Stops Re-purposing and improving existing public toilets (3
on Cumbrae, nine on Arran) to provide better facilities,
supporting increased dwell time and spend on the
islands. Consultation currently underway with the
associated communities ahead of drawing up scope for
each site. 
Support the delivery of the Island Pit Stop project with local
community organisations including finalising designs and
funding allocations. 
Reinstatement Reinstatement/replacement of the Melbourne Park
public toilets in Saltcoats which were fire-damaged in
late 2021.
Facilities Management are undertaking a review of North
Ayrshire Public toilet facilities. The next steps will be
informed by this process and consider the options identified
through the feasibility study funded by the Repurposing
Property Grant Fund.
Refurbishment Refurbishment of the Promenade Toilets in Largs,
financed by the Largs Car Park Fund. Work began in
April 2023.
The refurbishment of the Promenade toilets is now complete
and pay gates have been installed.
Review of assets  Facilities Management are undertaking a review of
North Ayrshire Public toilet facilities.
A community asset transfer has now been agreed for
the Ardrossan South Beach toilet block with ambitious
plans from the Ardrossan Community Group.
Review is ongoing with a report being prepared looking at
options for public conveniences across North Ayrshire. This
will be informed by the consultation with community groups
in Saltcoats and Largs currently underway to assess the
interest from these groups in taking over the running or
ownership of the sites.
Playparks, and public areas 
Upgrade and renew playparks 
Playparks Replacement and upgrade of playpark equipment
across North Ayrshire. 
Phase 1 complete covering coastal and inland areas. 
Phase 2&3 now complete which mainly focused on inland
play areas. Now planning phase 4, continuing to focus on
inland play areas. Phase 5 (final phase) will be in budget
year 25/26.

Page 14

11 
Coastal Hub Play
Park, Irvine 
New  As part of the Ayrshire Growth Deal investment at Irvine
Harbourside and subject to approval of the Full Business
Case, works are planned to be on site by October 2024 to
create improved play facilities at Irvine Beach Park for
completion by June 2025. 
Renew benches and picnic tables and upgrade bins 
Benches Programme of replacement assets is almost complete
with benches, wheelchair accessible picnic benches,
new bins at coastal locations installed to provide
facilities for visitors to enjoy promenade areas and
beaches.
The programme of replacement assets is nearing
completion with benches, wheelchair accessible picnic
benches, new bins at coastal locations installed to provide
facilities for visitors to enjoy promenade areas and beaches.
Picnic tables
Bins
Additional visitor and cultural interventions 
Heritage Trails Build on heritage trails and on website created to host
the trails.
Heritage website now launched and fully operational.
Funding secured to carry out a feasibility study into the
creation of an outdoor museum and heritage trail in Largs.
STEM Trails A new STEM trail is complete for Eglinton Park and
work has started on co-creation of the Cumbrae trail
with the local school and the Field Studies Centre,
Millport, taking in the learning from Eglinton.
Identify new opportunities for STEM Trails. Eglinton Trail is
now officially launched. Cumbrae is still in development with
another proposed for Bourtreehill Park, Irvine.
Eglinton Park  New walking routes created, benches added, BBQ
disposal units installed and information video created,
enhanced directional signage installed, outdoor
washroom area created. Classroom still to be
completed and upgrade of all-ability play area is
pending.
Upgrade of the all-ability play area is now complete.
Exploring options for a covered picnic area to enhance
visitors experience during inclement weather. Work is
underway to create a dog park, bringing a new attraction to
the Park and we will continue to develop this in 2024. The
web site requires an update which will be carried out in
2024. Carry out improvements as suggested in the Visit
Scotland assessment of January 2023. Work with partners
to develop a programme of events in the Park including
farmers markets, art exhibitions and craft fairs. Support the
promotion of the Park as a filming location to assist with
attracting visitors post filming / airing.

Page 15

12 
Arran Geopark Two seasonal Arran Access Rangers funded by
NatureScot via Arran Access Trust. Rangers liaise with
Streetscene Grounds Supervisor where appropriate.
Collaborate with staff at Arran Geopark and Island Plan -
Community Working Group to engage with the local cultural
and heritage groups to influence the areas of spend
associated with the award from Scottish Government and
deliver outputs for the engagement. 
Interpretation Interpretation panels at Ardrossan Castle and St
Bride's Chapel, Lamlash – St Brides complete,
Ardrossan still in development with local heritage
group.
Install the interpretation boards on site at Ardrossan Castle.
Support Active Travel with interpretation along the new cycle
path at Ardrossan North Shore. Funding has been secured
to install interpretation along the riverside path connecting
Kilwinning Abbey and Eglinton Castle, this will be worked on
in 2024. Work with the local community to create
interpretation at the site of the original Parish Church of
Ardrossan.
Lighting and
interpretation
Upgrading at Kilwinning Abbey Tower – new
interpretation in place at entrance, further interpretation
to follow as part of the Place Making engagement and
funding. Lighting installed and in use for key dates
including Go Purple and Remembrance Day.
New interpretation requires to be installed. Work on the
conservation of the tower will be progressed in 2024, part
funded by the Place Based Investment Programme.
Marine Tourism 
Moorings, transit marinas and step-ashore facilities 
Moorings A payment system was investigated into charging
visitors to use NAC visitor moorings at Arran and
Cumbrae and a business case for cost recovery was
concluded.
The business case recommended that charging be further
explored in line with the development of the AGD Marine
Tourism Programme projects, where third party operators
will be sought to operate and manage the new marina
facilities and moorings. This will be considered further
informed by the development of the AGD project operating
models, leasing arrangements and discussions with future
operators.
Marine Transit
facilities 
The AGD Marine Tourism Programme has progressed
the development of business cases for marine
infrastructure at Arran and Cumbrae. This includes the
Ongoing. Anticipating approval by Government of the
Programme Business Case and subsequent preparation and
approval of Outline Business Case(s) during 2024, which will

Page 16

13 
development of a fifty up to 100-berth transit marina at
Millport and a step-ashore transit marine facility at
Lamlash. Development work continues to progress
with communities and stakeholders and the
preparation of UK Green Book Business Cases as
required by Scottish Government and the AGD to
secure investment
enable further detailed development of the marine transit
proposals. 
Communication, Education and Engagement 
Communication, campaigns and enforcement activities 
Targeted
Campaigns
Targeted info to visitors and communities through print,
PR, website and social media (#LoveNorth Ayrshire)
Continued targeted provision of information to visitors and
communities through print, PR, website and social media
(#LoveNorth Ayrshire)
My Beach Your
Beach and Keep
Scotland
Beautiful
Participation in educational campaigns and promotion
of messaging
Continued participation in educational campaigns and
promotion of messaging
Safer Shores  Participation in education and enforcement activities. Continued participation in education and enforcement
activities.
Multi-Agency co-
operation
Multi-agency co-operation to gather intelligence on
unofficial events (e.g., beach parties, car cruises), with
interventions to mitigate effects from litter, noise and
anti-social behaviour.
Continued multi-agency co-operation to gather intelligence
on unofficial events (e.g., beach parties, car cruises), with
interventions to mitigate effects from litter, noise and anti-
social behaviour.
Ayrshire Smiles Promotion of ‘Ayrshire Smiles’ customer-service
training website in conjunction with South and East
Ayrshire Councils. 
Continued promotion of ‘Ayrshire Smiles’ customer-service
training website in conjunction with South and East Ayrshire
Councils. 
5G Event Space
project
Funding has been secured for Smart Columns at the
Great Harbour and Beach Park event spaces. 
Continue to develop a robust solution for connectivity for
large events in North Ayrshire, working with partners in East
and South Ayrshire Councils.

Page 17

14 
Events and Festivals 
Events and Festivals, cultural activities 
Making Waves
Festival
The Scottish Maritime Museum undertook a Summer
Market event in 2023.
Scottish Maritime Museum is planning a Summer Market
event 2024. Work is also underway to consider a ‘Making
Waves’ festival for 2025.
Community Event
Support
Provision of event equipment for community events to
reduce costs and improve event sustainability.
Partially completed, some resources have been
purchased and there is ongoing engagement with
community groups on what additional resources are
needed in 2023.
Software has been purchased to assist groups with planning
and costing up events. Training will be delivered to groups in
its use. 
Scotland's
Themed Years
Year of Stories 2022 events were delivered across
North Ayrshire. 2023 was not a themed year, we await
2024 theme in order to make plans and funding
applications. 
There will be no themed year in 2024. EventScotland is
currently scoping for options and approaches for a possible
2025 themed year which will be announced in 2024 to allow
time for development of events, activities and funding
applications.
Events and
Activities
Delivery of new events and activities at Harbour Arts
Centre, North Ayrshire Heritage Centre, Museum of
the Cumbraes, Irvine Townhouse.
Continued support of exhibition programmes across the
cultural venues with a mix of local artistic talent alongside
hosting touring exhibitions. Building on the huge success of
the Titanic Exhibition as we programme the Heritage Centre
and Museum of the Cumbraes.
Event Calendar Develop an event calendar to ensure we are promoting
events in the area to build our audience and increase
attendance, economic impact and community
participation
An events listing has been compiled and uploaded to the
CPP website, linked from the main Council website and will
be used in social media promotion of local events. Going
forward, a dedicated events calendar will be developed for
the new Council website.
Scotland’s Marine
Tourism
Conference
New action for 2024 North Ayrshire hosted Scotland’s Marine Tourism
Conference which is part of the national Scottish Tourism
Month Programme and aimed at those with an interest in the
marine tourism sector, whether in skills, supply chain,
marketing or development. This aligns with our AGD Marine
Tourism projects.

Page 18

15 
Partner Engagement/Activities 
Regional
Partnership
Ayrshire and our islands Visitor Economy Strategy and
Draft Action Plan approved by Regional Economic
Partnership Board in February 2023 and subsequently
by the Ayrshire Economic Joint Committee. Partner
resourcing and governance being explored for delivery. 
Refresh the Ayrshire and Arran Visitor Economy Leadership
Group and develop an updated Action Plan for 2024.

Page 19

8. Visitor Management Plan Ambitions 
This plan focuses on identifying early interventions and highlighting developments
which are underway. Larger investments and longer-term projects require
appropriate planning, consultation, review and implementation and by necessity
must form part of a longer-term strategy. The North Ayrshire Council Strategic
Tourism Infrastructure Development Plans cover our longer-term ambitions. 
This Visitor Management Plan is a working document, reviewed periodically and
revised annually. 
There are several strategic themes that require ongoing review and action and to be
informed by infrastructure capacity assessment. In addition to the delivery of the
actions in the Plan, the following priority areas will be reflected on – both in terms of
identifying issues, potential action and resourcing implications: - 
o Reflecting on strategic priorities identified through the Ayrshire Regional
Economic Strategy and the Ayrshire and our Islands Visitor Economy
Strategy and Draft Action Plan
o Reflecting on local strategic priorities, including those informed by the
Ayrshire Growth Deal and the Council’s marine tourism programme.
o Implementation of identified solutions to support motorhomes.
o Proactively identifying potential funding sources from external funders to
support future activities.